Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
214-042
7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 06-01A Extended Perforating Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 214-042 50-029-20172-01-00 11531 Conductor Surface Intermediate Liner 8900 81 2696 9592 9889 10625 20" 13-3/8" 9-5/8" 7-5/8" x 7" 9033 25 - 106 24 - 2720 22 -9614 21 - 9910 25 - 106 24 - 2720 22 - 8894 21 - 9043 none 520 2670 4760 4790 10625 , 11190 1530 5380 6870 6890 10022 - 11240 4-1/2" 12.6# x 3-1/2"9.3# L-80 19 - 8917 9041 - 8994 Structural 7" Baker SBP 6899 / 2195 7382 6899 Bo York Operations Manager Jerry Lau Jerry.Lau@hilcorp.com (907) 564-5280 PRUDHOE BAY / PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028311 , 0028308 19 - 8260 215 476 21285 14415 41 349 0 0 913 784 324-454 13b. Pools active after work:PRUDHOE OIL 4-1/2" AVA TRSV SSSV 7382 / 2195 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 11:18 am, Oct 21, 2024 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2024.10.17 14:56:32 - 08'00' Bo York (1248) WCB 2-10-2025 RBDMS JSB 103124 DSR-10/23/24 ACTIVITYDATE SUMMARY 9/18/2024 LRS CTU 1, 1.5" Blue Coil. Job Objective: Set CIBP& Ext Adperf MIRU. Function test BOPs upon installation. Bump up test against brass. Function test H2S/LEL monitors. Make up and RIH with 1.75" DJN drift BHA. Load well with 150bbl of 1%KCL. Drift down to 10826. POOH. Make up/RIH with HES GR/CCL. Log from 10827 to 8650 CTM. Pipe flagged at 10341. POOH. Well control drill with day crew - kick while tripping. Have good log data that shows a -18' correction. Make up CIBP BHA and bullhead 150 bbl of 1% KCL. RIH. correct depth at flag and set at 10,625'. POOH L/D NS setting tool perform kick while tripping drill with crew. M/U 207' HES 1.56" Millenium guns ***Continued to WSR on 9/19/24*** 9/19/2024 LRS CTU 1, 1.5" Blue Coil. Job Objective: Set CIBP& Ext Adperf M/U injector to deployed guns. RIH w/207' of HES 1.56"Millenium guns. correct to bottom shot at CIBP. perforate interval 10,347' - 10,554' w/HES 1.56" millenium charges 6spf 60 degree phase. POOH maintaining hole fill. Flow check well at surface. Lay down perf gun assembly on .3bpm loss rate. Pump 5 bbl 60/40 cap on the well. Did not fully freeze protect as per DSO who intends to POP immedeately. RDMO. ***Job Complete*** Daily Report of Well Operations PBU 06-01A j M/U injector to deployed guns. RIH w/207' of HES 1.56"Millenium guns. correct tojyg bottom shot at CIBP. perforate interval 10,347' - 10,554' Makeyggg up CIBP BHA and bullhead 150 bbl of 1% KCL. RIH. correct depth at flag and set at 10,625'. POOH 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in this pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU 06-01A Extended Perforating Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 214-042 50-029-20172-01-00 ADL 0028311 , 0028308 11531 Conductor Surface Intermediate Liner 8900 81 2696 9592 9889 11190 20" 13-3/8" 9-5/8" 7-5/8" x 7" 9011 25 - 106 24 - 2720 22 -9614 21 - 9910 2430 25 - 106 24 - 2720 22 - 8894 21 - 9043 none 520 2670 4760 4790 11190 1530 5380 6870 6890 10022 - 11240 4-1/2" 12.6# x 3-1/2"9.3# L-80 19 - 89179041 - 8994 Structural 7" Baker SBP 4-1/2" AVA TRSV SSSV 7382 / 2195 6899 / 2195 Date: Bo York Operations Manager Jerry Lau Jerry.Lau@hilcorp.com (907) 564-5280 PRUDHOE BAY Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov 8/20/24 By Grace Christianson at 10:31 am, Aug 06, 2024 Digitally signed by David Bjork (3888) DN: cn=David Bjork (3888) Reason: I am approving this document. Date: 2024.08.06 07:25:00 -08'00' David Bjork (3888) 324-454 DSR-8/12/24 10-404 A.Dewhurst 08AUG24 MGR12AUG24*&: Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2024.08.13 15:07:51 -08'00'08/13/24 RBDMS JSB 081424 CT Extended Add Perfs 06-01A PTD: 214-042 Well Name:06-01A API Number:50-029-20172-01 Current Status:Operable Rig:Coil Estimated Start Date:7/26/24 Estimated Duration:1.5 days Regulatory Contact:Carrie Janowski 564-5179 Permit to Drill Number 214-042 First Call Engineer:Jerry Lau (907) 564-5280 (O)(907) 360-6233 (M) Second Call Engineer:Dave Bjork (907) 564-4672 (O)(907) 440-0331 (M) Current Bottom Hole Pressure:3251 psi @ 8,800’ TVD 7.3 PPGE | (9/19/16 SBHPS) Maximum Expected BHP:3310 psi @ 8,800’ TVD 7.3 PPGE | (Average Ivishak BHP) Max. Anticipated Surface Pressure:2430 psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP:2382 psi (Taken on 1/10/21) Min ID:1.78” busing @ 8,845’ MD Max Angle:111 Deg @ 11,282’ MD Tie In Log:06-01A 2014_05_26 BKR RPM Brief Well Summary: 06-01A was CTD sidetracked in May 2014 with a 2 3/8” liner. There have been 8 intervals of Z2A/B adperfs shot over the life of the well. The toe perfs are covered with a CIBP. The intent of the program is to shoot additional perf footage to fill the liner. Objective: CT Set CIBP to isolate 2015/16 perfs, add 207’ of Z2A perforations using the CT open hole deployment system. Procedure: Coiled Tubing Notes: x Remote gas monitoring for H2S and LELs are required for Open Hole Deployment Operations x Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS coverage is required. x The well will be killed and monitored before making up the initial perfs guns. This is generally done during the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. 1. After MU MHA and pull testing theCTC, tag-up on the CT stripper to ensure BHA cannot pull through the brass upon POOH with guns. 2. Load well with 1% KCL/SW down TBG. Max tubing pressure 2500 psi. This step can be performed any time prior to open-hole deployment of the perf guns. Timing of the well kill is at the discretion of the WSS. a. Wellbore volume to top perf = 98bbls i. 4-1/2” Tubing – 2517’ X 0.0152 bpf = 38 bbls ii. 3-1/2” Tubing – 6302’ X 0.0087 = 55 bbls iii. 2-3/8” Liner – 1203’ X 0.0039 = 5 bbls 3. MU and RIH with logging tools and drift BHA: 1.56” dmy gun & nozzle. 4. Flag pipe as appropriate per WSS for single perf run. CT Extended Add Perfs 06-01A PTD: 214-042 5. POOH and freeze protect tubing as needed. 6. Confirm good log data. 7. RIH w/ 2-3/8” CIBP, set @ 10,625’ MD. 8. At surface, prepare for deployment of TCP guns. 9. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/KWF, 8.4 ppg 1% KCl or 8.5 ppg as needed. Maintain hole fill taking returns to tank until lubricator connection is re-established. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. 10.*Perform drill by picking up safety joint with TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. a.At the beginning of each job, the crossover/safety joint must be physically MU to the perf guns one time to confirm the threads are compatible. 11.Break lubricator connection at QTS and begin makeup of TCP guns per schedule below. Constantly monitor fluid rates pumped in and fluid returns out of the well. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. Perf Schedule *HES 1.56" Millenium guns were used to estimate for this job and calculate gun weights. Perf Interval (RUN 1)Perf Length Gun Length Weight of Gun (lbs) 3.62 lbs/ft 10347 - 10554 207’207’749 12. RIH with perf gun and tie-in to coil flag correlation. Pickup and perforate interval per Perf Schedule above. a. Note any tubing pressure change in WSR. 13. After perforating, PUH to top of liner or into tubing tail to ensure debris doesn’t fall in on the guns and stick the BHA. Confirm well is dead and re-kill if necessary before pulling to surface. 14. Pump pipe displacement while POOH. Stop at surface to reconfirm well is dead. Kill well if necessary. 15. Review well control steps and Standing Orders with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 16. Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun BHA. 17. FP well 18. RDMO CTU. Attachments: 1. Current Wellbore Schematic 2. Proposed Wellbore Schematic 3. Coil Tubing BOPE Schematic 4. Standing Orders for Open Hole Well Control during Perf Gun Deployment 5. Equipment Layout Diagram 6. Tie In Log 7. Sundry Change Form Make up PCE. -mgr CT Extended Add Perfs 06-01A PTD: 214-042 Current Wellbore Schematic CT Extended Add Perfs 06-01A PTD: 214-042 Proposed Wellbore Schematic CT Extended Add Perfs 06-01A PTD: 214-042 Coiled Tubing BOPs CT Extended Add Perfs 06-01A PTD: 214-042 Standing Orders for Open Hole Well Control during Perf Gun Deployment CT Extended Add Perfs 06-01A PTD: 214-042 Equipment Layout Diagram CT Extended Add Perfs 06-01A PTD: 214-042 Tie In:06-01A 2014_05_26 BKR RPM CT Extended Add Perfs 06-01A PTD: 214-042 CT Extended Add Perfs 06-01A PTD: 214-042 Changes to Approved Sundry Procedure Date: Subject: Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HAK Prepared By (Initials) HAK Approve d By (Initials) AOGCC Written Approval Received (Person and Date) Operations Manager Date Operations Engineer Date Operator Name:2. Development Exploratory Service 5 Permit to Drill Number:214-042 6.50-029-20172-01-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 11531 11190 9010 7382 , 8819 none 11190 6899 , 8171 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 81 20" 25 - 106 25 - 106 1530 520 Surface 2696 13-3/8" 24 - 2720 24 - 2720 5380 2670 Intermediate 9592 9-5/8" 22 -9614 22 - 8894 6870 4760 Production Perforation Depth: Measured depth: 10022 - 11240 feet True vertical depth:9041 - 8994 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# x 3-1/2"9.3# L-80 19 - 8917 7382 , 8819 6899 , 8171Packers and SSSV (type, measured and true vertical depth) 7" Baker SBP, 2-3/8" 35KB Liner 9889 7-5/8" x 7" 21 - 9910 21 - 9043 6890 , 8160 4790 , 7020 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 286-1570174 7649988 -15 11471 410 305 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Ryan Thompson Ryan.Thompson@hilcorp.com Authorized Name:Bo York Authorized Title: Authorized Signature with Date:Contact Phone:(907) 564-5280 Treatment descriptions including volumes used and final pressure: 13. Operations Manager Operations Performed1. Abandon Plug Perforations Fracture Stimulate Pull Tubing GSTOR WINJ WAG GINJ SUSP SPLUG 16. Well Status after work:Oil 5 Gas Exploratory Development 5 Stratigraphic 15. Well Class after work: Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured8900 Sundry Number or N/A if C.O. Exempt: 320-515 4-1/2" AVA TRSV SSSV 2195 2195 Junk Packer Printed and Electronic Fracture Stimulation Data 5 CT extended perforating Operations shutdown Change Approved Program 5 Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend 5Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 028311 & 028308 PBU 06-01A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations By Samantha Carlisle at 11:46 am, Jan 28, 2021 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2021.01.28 11:08:51 -09'00' Bo York SFD 1/28/2021DSR-1/28/21MGR18FEB2021 RBDMS HEW 1/29/2021 ACTIVITYDATE SUMMARY 1/10/2021 CTU #9 - 1.50" Coil Job Objective: Extended Length Perforating MIRU CTU. Make up Safety Joint. RIH w/ Slb GR/CCL Tools. From above CIBP perform Btms up Kill. Circulate117 bbls 1% KCL to kill well. Tag at 11,122'. Appear to be tagging a little higher than the CIBP. Re-tag same depth. Log from compression up to 8700'. Flag Pipe at 10199.7'. POOH while pumping KCl down backside to keep hole full. Build Scaffold on wellhouse. Position Boom Truck Crane. Circulate across top to ensure fluid column and lay down logging BHA. Confirm +1.5' correction, corrected tag at 11113'. Begin making up perforating BHA. ...Job in Progress... 1/11/2021 CTU #9 - 1.50" Coil ***Cont. from WSR 1-10-21*** Job Objective: Add Perf RIH with perf gun run #1 with 31' x 1.56" Geo Razor perf guns, 6 spf. Tie-in at flag and perforate 10554-10585. POOH keeping hole full with KCl. Pump across the top from trip tank. Undeploy Gun Run #1. All shots fired, ball recovered. Deploy Gun Run #2 with 1.56" x 132' Geo Razor HES Perf Guns. Correct depth at flag. Perforate Interval 10215' - 10347'. Good indication of firing. Pooh keeping hole full with 60/40 Meth. Pump across the top & Undeploy Gun Run #2. All shots fired, ball recovered. Shut in well & secure due to upcoming blow. Tbg Freeze Protected w/ 60/40 Meth. Begin Weather at 19:00. ...Job Incomplete.... 1/13/2021 CTU #9 - 1.50" CT .109 WT ...Cont. from WSR 1/12/21... Job Objective: Add Perf Return to work after Phase conditions. MU and RIH w/ gun #3 maintaining slight over balance on BHP ...Continue WSR on 1/14/2021... 1/14/2021 CTU #9 - 1.50" CT .109 WT ***Cont. from WSR 1/13/2020*** Job Objective: Add Perf RIH with perf gun run #3 with1.56" Geo Razor HES perf guns, 6 spf. Tie-in at flag continue to shooting depth and perforate10022'-10075', 35' spacer, 10110'-10132'. Good indication of guns firing. POOH keeping hole full with KCL. Pump across the top from trip tank during recovery of gun run #3. All shots fired and ball recovered. FP well with 34 bbls of 60/40 Tags hung DSO notified to POP well once CT equipment off well. Swap BOPs for 45 day inspection. RDMO CTU. ***Job Complete*** Daily Report of Well Operations PBU 06-01A Operator Name:2. Exploratory Development Service 5 Permit to Drill Number:214-042 6.API Number:50-029-20172-01-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Field/Pools:9. Well Name and Number: ADL 028311 Property Designation (Lease Number):10. CO341I 8. PBU 06-01A 7.If perforating: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Stratigraphic Current Well Class:4. Type of Request:1.Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Op Shutdown GAS GSTOR WAG SPLUG Abandoned Oil 5 WINJ Exploratory Development 5Stratigraphic Service WDSPL 12. Attachments: PRESENT WELL CONDITION SUMMARY 11531 Effective Depth MD: L-80 11. Commission Representative: 15. Suspended Contact Name: Ryan Thompson Contact Email: Ryan.Thompson@hilcorp.com Authorized Name: Bo York Authorized Title:Operations Manager Authorized Signature: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other: Yes No Spacing Exception Required?Subsequent Form Required: Approved by:COMMISSIONER APPROVED BYTHE COMMISSION Date: OtherAlter Casing Pull Tubing Conditions of approval: Notify Commission so that a representative may witness Sundry Number: COMMISSION USE ONLY 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Detailed Operations Program Packers and SSSV Type: 4-1/2" AVA TRSV SSSV Packers and SSSV MD (ft) and TVD (ft): Perforation Depth MD (ft):Tubing Size: Size Total Depth MD (ft):Total Depth TVD(ft): 8900 Effective Depth TVD:Plugs (MD):Junk (MD): Other Stimulate Re-enter Susp Well Suspend Plug for Redrill Perforate Perforate New Pool 7382 , 8819 / 6899 , 8171 2195, 2195 Date: Well Status after proposed work: 16. Verbal Approval: Change Approved Program 24 - 2720 24 - 2720 14. Estimated Date for Commencing Operations: BOP Sketch 25 - 106 Structural 6870 Proposal Summary 13. Well Class after proposed work: 7"Baker SBP, 2-3/8" 35KB 10845 - 11240 9031 - 8994 4-1/2" x 3-1/2"19 - 8917 Liner 11190 9011 11190 25 - 106 520 13-3/8" 9-5/8" Contact Phone:907-564-5280 Date: 4760 81 153020" 94# Conductor 2670 GINJ 5 Post Initial Injection MIT Req'd? Yes No 5 Comm. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Surface 2696 5380 Intermediate 9592 22 - 9614 22 - 8894 9889 7-5/8" x 7" 21 - 9910 21 - 9043 6890 , 8160 4790 , 7020 Address:3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 3. No 5Yes Casing Length MD TVD Burst Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft): Collapse MPSP (psi): Wellbore Schematic Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 03/2020 Approved application is valid for 12 months from the date of approval. 12/08/20 CT extended perforating 55 12/20/2020 2371 none By Samantha Carlisle at 2:03 pm, Dec 08, 2020 320-515 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2020.12.08 13:56:07 -09'00' Bo York DSR-12/9/2020SFD 12/9/2020 SFD 12/9/2020ADL 028308 SFD 12/9/2020 10-404 MGR10DEC2020 Yeon Required? Comm 12/10/2020 dts 12/10/2020 JLC 12/10/2020 RBDMS HEW 12/14/2020 Add Perf 06-01A PTD: 2140420 Well Name:06-01A Extended Perforating API Number:500292017201 Current Status:Online Rig:CTU & Surface Deployed TCP Guns Estimated Start Date:1/1/2020 Estimated Duration:2days Reg.Approval Req’std?10-403 Date Reg. Approval Rec’vd: Regulatory Contact:Carrie Janowski Permit to Drill Number:2140420 First Call Engineer:Ryan Thompson Office: 907-564-5280 Cell: 907-301-1240 Second Call Engineer:Dave Bjork Office: 907-564-4672 Cell: 907-440-0331 AFE Number:2024351 IOR 100 Current Bottom Hole Pressure:3251 psi @ 8,800’ TVD 7.1 PPGE | 9/19/16 SBHPS Max. Anticipated Surface Pressure:2371 psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP:2120 psi (Taken on 10/23/18) Min ID:1.78” Bushing @ 8845’ MD Max Angle: 110° @ 11281’ Reference Log: Baker RPM May 26, 2014 Brief Well Summary: 06-01A was CTD sidetracked in May 2014 with a 2 3/8” liner. 4 intervals of adperfs have been shot over the life of the well. The toe perfs are covered with a CIBP. The intent of the program is to shoot additional perf footage to fill the liner using coil extended length perforating. Cerberus modelling shows no lockup prior to the CIBP at 11190 with a ~250’ toolstring of 1.56” guns with 1.5” coil. Add Perf 06-01A PTD: 2140420 Sundry Procedure (Approval Required to Proceed): Note: The well will be killed and monitored before making up the initial perfs guns. This is generally done during the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. Coil Tubing 1. MIRU Coiled Tubing Unit w/ 1.5“ coil and spot ancillary equipment. 2. Drift w/ ~1.7" nozzle & GR/CCL to CIBP @ 11190’ MD. POOH and confirm good data. 3. RIH with gun run #1 and adperf per Table 1. POOH. Laydown spent guns. 4. Bullhead 151 bbls of 8.4 ppg 1% KCl. a. Wellbore volume to top perf = ~101 5. Confirm well is dead. Freeze protect tubing as needed. 6. At surface, prepare for deployment of TCP guns. 7. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/8.4 ppg 1% KCl as needed. Maintain minimum 0.5 bbls/min continuous hole fill taking returns to tank until lubricator connection is re-established. 8. Pickup 1.5” safety joint and TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. Table 1: 06-01A Proposed Ad-Perf Gun Runs Gun Run # Perf Top Perf Bottom Perf Length Blank Top Blank Bottom Blank Length 1 10554 10585 31 2 10215 10347 132 3 10022 10075 53 3 10075 10110 35 3 10110 10132 22 9. Pick up Gun Run 2 per table 1. 10. RIH with Gun Run 2 and tie in. Pickup and perforate. POOH. a. Note any tubing pressure change in WSR. 11. POOH. Stopping at surface to reconfirm well is dead and hole full. If not, kill well per step 4 and monitor. 12. Review well control steps with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 13. Lay down perf guns. 14. Pick up Gun Run 3 as outlined in Table 1. * Gun run #1: Fully lubricated BHA through PCE. Standing orders flow chart included with this sundry request. *See note above regarding kill methods if pressure observed at surface after perforating. Add Perf 06-01A PTD: 2140420 15. RIH with Gun Run 3 and tie in. Pickup and perforate. POOH. b. Note any tubing pressure change in WSR. 16. POOH. Stopping at surface to reconfirm well is dead and hole full. If not, kill well per step 4 and monitor. 17. Review well control steps with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 18. Lay down perf guns. 19. RDMO CTU. 20. Return to production per ops or freeze protect well. Attachments: 1. As-built Schematic 2. Proposed Schematic 3. Coil Tubing BOPE Schematic 4. Equipment Layout Diagram 5. Standing Orders for Open Hole Well Control during Perf Gun Deployment 6. Tie In Log/Perf Sheet Add Perf 06-01A PTD: 2140420 Add Perf 06-01A PTD: 2140420 Proposed Schematic Add Perf 06-01A PTD: 2140420 Coiled Tubing BOPs Add Perf 06-01A PTD: 2140420 Equipment Layout Diagram Add Perf 06-01A PTD: 2140420 Standing Orders for Open Hole Well Control during Perf Gun Deployment Add Perf 06-01A PTD: 2140420 06-01A Tie-In Log Add Perf 06-01A PTD: 2140420 • STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS + 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate Q Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 214-042 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20172-01-00 7. Property Designation(Lease Number): ADL 0028311 8. Well Name and Number: PRUDHOE BAY UNIT 06-01A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 11531 feet Plugs measured 11190 feet true vertical 8900 feet Junk measured feet JAN 0 9 2017 Effective Depth: measured 11190 feet Packer measured 7382 feet true vertical 9011 feet Packer true vertical 6898.7 feet AOGCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 81 20"94#H-40 25-106 25-106 1530 520 Surface 2696 13-3/8"72#MN-80 24-2720 24-2720 5380 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 10982-11042 feet 11042-11102 feet 11220-11240 feet True vertical depth: 9031-9030 feet feet 9030-9031 feet 9000-8994 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 4-1/2"AVA TRSV SSSV 2195 2195 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: %WED MAP' 8 2017, 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 92 3134 1 1050 271 Subsequent to operation: 649 8280 7 1292 276 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations Q Exploratory ❑ Development Q Service ❑ Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG ❑ GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature A'V_"\ C_-_ Phone +1 907 564 4424 Date 1/9/17 Form 10-404 Revised 5/2015 dd Yn.- 2 i// 1�,f��1I BDMS [/1/JAN 2 5 2a17 Submit Original Only • . a) ca Q,o 0 0 0 0 0 0 0 0 0 Cp N I O N CO CO CO N O U coto C` O O N- O O CC) C N C[) • In t` V CO0 CD EC) OOD 0) CO CO O CCS coOO M Cfl CO N- Cn CO CO CO CO CO 00 CO OOOCD C C) 000 O N N- ct CO C D 'd' O N CO N- O O) O 1.0 CO O O) tf) N N CO CO 0) N- CO CA CO N CO 1111111111 H O CO O O) — O CC) V N- N CO O) N- O N N N N CCO N N N- coOOBD CV ♦+ Q C G) OO NOO) NI- OCON El ONNsONLU NN- N- O ct O) vs CO O) CC) O) N CO N- 0) CO 0) CA N CO Q Z r- CO O) N O) O LU �t N. N r- in CO c- O)'N �� N N N M N N N Nt CO Ns CO N C .0 MM• W ~_ O LU 00 00 moo? O OO) O O C_ •i Z cooz'Z' O pap OJO J CO 0) 4 No * (/) CO •y nW 4# N ' CV • CO W N O - CV N N V ac'7 � � � 0 � � N � M r O 0) .cCD 0 _ Cf) CO a) CLU N N- O 0)) C CO CO Co CO CO N LU N- LU CO N M N O LO N N N CO W F- HZZZ QQOOO N o r W W U U U U O u_ CCCLOO =p OO CCCLZ Z ZDW WOOOW WOOm O m ~ ~ cecCZ Z D J Uto CL0- a _I _II- I- • . Packers and SSV's Attachment PRUDHOE BAY UNIT 06-01A SW Name Type MD TVD Depscription 06-01A SSSV 2195.31 2195.28 4-1/2"AVA TRSV SSSV 06-01A TBG PACKER 7382.4 6898.7 7" BAKER SBP PACKER 06-01A PACKER 8819 8170.68 2-3/8" 35 KB Packer • • a CU .. f f o I o § � / co • R c a -,/ N- -14 eL Cl- -ooc b 4 (U [ k o 0 ®- E Ee OEE ' 2 -ikEa • = m _ ■ a 2 -' c � Oma@ $ / o %- o wco o -r E CU I ƒ % / 2 E e � 2 _I ! m CL 1-,.. 0 2G 1aXa � H - Z kk _1 / • _7 @ = 2 & R L III � 2• � / O O oM 2m - E - ' � 00O. 00 al a0) / @A �7 Q / .- m = $ � - p� § 0- t $ O t O (U O Q g m 2 4 g 2CI / 0 $ 2 / 0 / ° _c | o < !O < aa= �R c, 3 b £ 2 U f 8_ ¥ S a - ' » = t E © ® c i m _3 /2 r ° o & 0 . 0) - / « 0 c _ _D ° ® 0 / e - 2 w § E o c @ O k & ! 0 -, 04c2-0 § i 2 L < coc 0 d>- ° # ® n # do / , R d d 0 TREE= 41/16'FMC ISA 0 ACTUATOR= OT BABY 0 -41 A MAXSAFETY NOTES:DOGLEG:35°WELL SEFP@G.28FOR�„ ELEV= 60' I PREVIOUS WELLBORE*" BF.ELEV= 20'CONDUCTOR, --1 81' KOP= 3200' 94#,1}.40, -1984 H ESTIMATED TOC(1991 RWO) Max Angle=111'@ 11282' D=19-124" ` ► Datum M)= —6 9576' ) t ► 2195' 14-112"AVA TRSV SSSV NP,D=3.812 Datum TVD= __ 8800 SS 9-5/8"UPPER FOC 2412' 1 . 2195' —14-1/2"HOLD OPEN SLV, A 4-1/2"TBG-PC,12.6#,1-80 BTC-M, H 2517' •.:y P44' ►d. D=2.80"(02/12/14) 0152bpf,D=3.958" Ili 1 y 2517' 1-14-1/2'X 3-1/2'XO,13=2.992" 9-5/8"LOWER FOC 2650' ' 1 �' 3061' -17-5/8"X 7"XO,D=6.276" t I CAMCO GAS LFT MANDRELS 13-3/8'CSG,72#,M-80,D=12.347" -1 2719' l • 5. i ST MD TVD DEV TYPE VLV LATCH FORT DATE ' e. 1 3109 3107 9 MNG DOLE RK 16 06/05/14 7-5/8"TEBACK LNR,29.7#, H 3061' '4; Y• . 2 5072 4913 27 WIG SO RK 20 06/05/14 1-80 FL4S,D=6.875' ` 3 6464 6109 32 MNG DMY RK 0 12/19/00 1 , 4 6927 6506 31 MNG DMY RK 0 12/19/00 Minimum ID = 1.78" @ 8845' t 5 7389 6905 30 NAG DMY RK 0 12/19/00 , 6 7855 7312 28 MAG DMY RK 0 12/19/00 ALUM BUSHING IN D E LOY SLV % immo 7 8163 7583 28 MMG DMY RK 0 12/19/00 P41 IP 8 8505 7887 26 MAG DM,' RK 0 12/19/00 4 f 9 8781 8136 25 MAG DMY RK 0 12/19/00 p. '* + TOP OF 7'LNR H 7380' 7380' -I8 1/4"SPB PKR w!TEBK SLV,D=6.313" 'I , 7384' H8-1/4'SEAL ASSY,D=6.25" 7''TIEBACK LNR,29#,L-80 BUTT,13=6.276' 7384' :t ;. it 7390' -18-1/4"X 7"LNR HGR,D=6.313' 8819' -135 BKR KB LW,D =1.81"(06/04/14) TOP OF 2-3/8" LNR -1 8834' . • I 8834' 2.70"BKR DEPLOY SLV,I)=2.250" TOP OF CEMENT ',j ! (NOTE ALUM BUStSNG ta-8845,113=1.78") ESTIMATED TOC(1991 RWO) -8900 Ile,E i 74 It '�`�:If, � • 48900' -17"X 3-112"BKR FB-1 PKR,D=4.000" I t I, % �, 8989' H3-1/2"OT15 XN NP D=2.75" NI , % iPI I '4, 9000' 3-1/2"BKR SHEA ROUT SUB,ID=3.00" 3-1/2"TBG PC,9.3#,L-80 EUE8RD M, -- 9001' ;lb 1.�' 9001' 3-1/2"WLEG,D=2.992! BEHIND .0087 bpf,D=2.992' Pli;A41 '♦ .i CT LNR F1' w. 1 8989' LMD TT LOGGED 07123/93 3-1/2"MONOBORE WHPSTOCK 9615' i•il,�•�I. •N{A,•: �`♦ 4N �:► w/CEMENT SLIP(05/12/14) fI'I I• *,11 1 11 4. MLLOUT WINDOW(06-01A) ' 9614"-9620' ♦1 1111%1 ♦1r %%%1 +49 if 4%°N. `% 10409' HPUP JONTWIRATAG /4".04/40°,4/41°if •. •, PERFORATION SUMMARY �%1%��r1��,% % 1. i. T I I I 1 1 "ATA I'A �i. °'• 10901' -{PUP JOINT REF LOG:GR/al ON 05/23/14 '�1�%♦ •' i`•� "� /4".0/4/4/1.0 I ••. ANGLE AT TOP FELE:910 @ 10845' 1ie11111I*IZi+I �•. �. w/RA TAG Note:Refer to Production DB for historical pert data �0.`1�4�tti�1� i_' �`%. ''N SCE SPF INTERVAL Opn/Sqz SHOT SQZ .11i1I►I�►I�►�1 i •1,, I11I%1%III%1 1• 1.56" 6 10845-10875 0 12/14/16 %%1%I1��I,1 • •• 1.56" 6 10982-11042 0 05/22/15 r,I�441,1,1'* N`' e`, 1.56' 6 11042-11102 0 05/21/15 IP e����4§: N+ ,di...,41, �' �# !� 2-318'WFTCBP 11190' '� , 1.56' 6 11220-11240 C 05/27/14 i'�!►!Y'I %I1� H , ♦►♦♦�Qtt. 1•� 11404 *1* P /,'.' (05/21/15) t;4.to 7"LNR 29#,L-80 BUTT,.0371 bpf,D=6.184' 9907' OP 110 FBTD H 11491' .%III% tlib le 9-5/8"CSG,47#,N-80/S00-95,13=8.681" --1 9918' 2-3/8"LNR,4.7#,L-80 TH511,.0039 bpf,D=1.995' -1 11530' DATE REV BY COMMENTS DATE REV BY COMNB'ITS PRUDHOE BAY UNIT 10122175 PAR 141 ORIGINAL COMPLETION 05/28/15 Mi/JM) SET CBP/ADPERFS(05!21-22/15) WELL- 06-01A 06/08/91 N2ES RYUO 08/04/16 CJWJM) CORRECTED HOLD OPEN SLEEVE FERM IT No: 2140420 05/29/14 NORDIC 1 CTD SIDETRACK(06-01A) 12/20/16 ATO/JIMD ADPERFS(12/14/16) API No: 50-029-20172-01 05/29/14 TW PJC FINAL ODE AFPROVAL SEC 2,T10N,R14E,723'FSL&1190'FEL 06/10/14 CJWPJC SET LTP(06/04/14 06/10/14 CJWPJC GLV C/O(06/05/14) BP Exploration(Alaska) STATE OF ALASKA ta t I V E D • AL ..,KA OIL AND GAS CONSERVATION COMMI—ION REPORT OF SUNDRY WELL OPERATIONS JUN 18 2UrL 1 Operations Abandon ❑ Plug Perforations L'J Fracture Stimulate U Pull Tubing U 1,f?p tAGs Ag ❑ Performed Suspend ❑ Perforate 0 Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ ,,,..,- Plug Plug for Rednll ❑ Perforate New Pool El Repair Well ❑ Re-enter Susp Well ❑ Other 5-1,-f C/BP !.r 2 Operator 4.Well Class Before Work 5 Permit to Dnll Number BP Exploration(Alaska),Inc Name Development 0 Exploratory❑ 214-042-0 3 Address P 0 Box 196612 Stratigraphic ❑ Service❑ 6.API Number Anchorage,AK 99519-6612 50-029-20172-01-00 7 Property Designation(Lease Number) 8 Well Name and Number ADL0028311 PBU 06-01A 9 Logs(List logs and submit electronic and printed data per 20AAC25.071) 10 Field/Pool(s). PRUDHOE BAY,PRUDHOE OIL 11 Present Well Condition Summary Total Depth measured 11531 feet Plugs measured 11190 feet true vertical 8899 61 feet Junk measured None feet Effective Depth measured 11190 feet Packer measured See Attachment feet true vertical 9010 5 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 81 20"94#H-40 23 5-104 5 23 5-104 5 1530 520 Surface 2696 13-3/8"72#MN-80 23-2719 23-2718 93 5380 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 10982-11042 feet 11042-11102 feet 11220-11240 feet True Vertical depth 9030 78-9030 29 feet 9030 29-9030 61 feet 9000 47-8993 67 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer 4-1/2"AVA TRSV SSSV 2195 31 2195 28 SSSV 12 Stimulation or cement squeeze summary Intervals treated(measured) SCANNED ; _ L:, , Treatment descriptions including volumes used and final pressure 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 224 23372 0 200 830 Subsequent to operation 255 19227 0 1800 831 14 Attachments 15 Well Class after work Copies of Logs and Surveys Run ❑ Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑ Daily Report of Well Operations 0 16 Well Status after work Oil 0 Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17 I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C 0 Exempt N/A Contact Garry Catron Email Garry.Catron@BP.Com Printed Name Garry Catron Title PDC PE Signature / ef Phone 564-4424 Date 6/18/2015 - Vn 71 qi RBDM� JUN 2 5 1015 �Mrn Form 10-404 Revised 10/2012 Submit Original Only Packers and SSV's Attachment 214-042 SW Name Type MD TVD Depscription 06-01A SSSV 2195.31 2195.28 4-1/2"AVA TRSV SSSV 06-01A PACKER 8819 8170.68 2-3/8" 35 KB Packer 06-01A PACKER 8900 8244.35 3-1/2" Baker FB-1 Packer m =O• O O 0 O 0 0 0 0 0 M M d NNNO00 � 0L0O 0C OV- ONN-0 0 ++ 0 0 0 0 0 0 0 0 0 0 0 M 0) CO CO O O N- O W M CO CO 3 O CO r r r CO r M 0 0 m r CO CD CO CO CO CO O CO r r M O r N M r MCO O 00 0 M 0) CO 0) M CO N- N- CO O CO r- M 0) 0) r N- 0) r O M r 0 0) CO M V- O O N- O N M M CO CO CO N N- CO N N CO CO C0 1.0 141 ,- 0 •T 0 1,- (0 O M M 0) CO 00) O- r 6 N 0 N r 0 CO r N - 0 O N M CO CO N N- NCO O O 0) O V- M N- CO 0) N 000 .— r O r r r r 0 Cl) N- 0) r N CO 0) N N CD 0) O) O O) N- CO N- O < C4 O CO (O r r r O M CO r 0 0)O N N CON- COD N N CO N r N Cp 441. M = N O O O O 0) O O O O O 0) CO � � � a CD 0) I CCD —' OZO2 - - • N 4t1� M M •� • N O N U N M Eo 00 M N N LO CC) 0) L9 M 4C'7 A 0) 6 , t ++ 0) r r CO r CO CO r N- r v- M M r 0) O 0) O 0) r0 C CD O M N N- M N- T CO O CM r • M cfN N N O r N N W J WW H H Z Z Z Cn0 000 F1- 00 1- 17- 1— w yoWW U 0 O W [t c c O O O . Z Z Z Z W W Z Z 0 0 0 W m m M fA '�• 0 O O CO a_ -c -03 OC4 r0 � m_t t1) d co LO { = Q.' c6 0 •,- ,_ aj o_ U O O i p C !n i-_,- ai G _0 b a_ U) 0) - p d Q� �CCO O c o p = a) Lo_ Ca � CO oEa) co cc) CU -- CD _C C 0- C a)m J O (D +' to O 0- U co '- co C -0 a U o)as U .0 0 a 0 W N m N L o_ O ~ op' OH = _C 0 E _ _ .3 00 �Z _c a) 0 0 .a a) . 3 � Lo —0 � -p � 27 —) 3 c c H 0) 2 cB p C �? d voi -d a) C ti = c oma-° D O - w p Q co O = O - D Q 1 0 p o0 Q � � U _ Ocfl ion 0,.0cn o .- • VI CO vi }, p a) to2 coy— ai CO U) " 32 ' p - Q_ J . F_ ,- _ p1— .-- C o U Q . Q Zo •. ri cn • O Y Ii � � Yo o, � �r? v � �- '++ .1 EOE C 0 u� (° � o .0 = O C i. CO .0 a) C4 a) co _ L ( 0_ 45 co 2 a) -0 l a) CD o � w 0) ca a1') � Ms . o � C C a C � 0 Q co N- O o o 0- 0)_ 0 N O N- a) 0 3 o_0 H 00' Lo a) pL .� 23Qa) �o o -0 L -0a) o L' `- C) CL _10 0- 0 0I 2) .- M .0 Q .._. p N 0. ca N u v ai U oo , c�L° a' Q ( '3 D al o) a) E p Q OdC � .o0H -0v E ) m27 � _o a) E m O O m- d p O C U t0 O cn � � a) wva (aoU = C° `- naa)i iva) °) Et° CNI CO 0) d 0 ap C O a/ C Q O CV L .c sr; C m o �.,) p„ s c0 O fa J .,_. 00 o)• Lo �O Er_ Q 't co V.Lo •a U p N H rn 2 0- � U 3 -0 --J p '' CO `- a Y C H - �- • a) J _ o d to o = U ' Q dI . -CCe EL E () In c i . ( a) o� Q to o)-0 a) N _ < O o)O a)N I COO 0 (6 _c o a) O to r- co O Q p OOD m * mac\ ) a) ) 8_CD LO CD F- � N C � � a) i I U d -5 2? 2 cq _ In o o p - 2 a . c - � a) Q_ a) omU jO , ° ED °' 0 0 Co 0o a) a) .o E 0 „..,c1- 0 a) o U ao c o 0 o y o ate) '� U _ ate) Q m U p- n o @ �n O o_ E cn C J C in• Q o Q O C "o o_a ,- CD CO a C "o O a) o co U m 0- C C n C Q n . m C U 2 o *k ai Q o • .a % C o 0 i O ca 0) ca = N _o * ,C lL N 0) 0 -Q co F- 00 'O 0)O H o 6" 3 j L a) D 1- 0 0 1I- 0 W O 0 D O U 0 (/) 2 ca P. UU 0 X0) 0 E = a_ a_ -a * UU (.0 - 2c : L.0 c7) F to to Na 0 o u) to N tail N 0 to 0 N N N C� r U) to to TREE= 4-1/16"FMC ISA ACTUATOR FMC 06-01A sr.L:TTY MAX DOGLEG.: WELL SEE PPG.2817'""" = OTIS-BABY OKB_B.EV= 60' I PREVIOUS WELLBORE... BF.B-EV= 20'CONDUCTOR, H 81' KOP= 3200' 94#,H-40, —1984 —ESTI MA ESTA I t3)TOC(1991 RWO) Max Angle=111'@ 11282' ID=19-124' Datum MD= 9576' w. 2195' —{4-112"AVA TRSV SSSV NP,D=3.812 Datum TV D= 8800 SS 9-518"UPPB2 FOC H 2412' F. ( 2195' —4-1/2"HOLD OPEN SLV w/DB LOCK, 4-112"TBG PC,12.6#,L-80 BTC-M, — 2517' D=2.80"(02/12/14) .0152bpf,ID=3.958" •y �`�` 2517'- 14-1/2"X 3-1/2"XO,ID=2.992" 9-5/8'LOWER FOC — 2650' 3061' y—{7-5/8"X 7"XO,D=6.276" i. 01 CAMO GAS LST MANDS ST MD TVDIDEC TYPE VLV LATRECH PORT DATE 13-3/8"CSG,72#,MN-80,D=12.347" —{ 2719' { 0. i- 1 3109 3107 9 MMG DOME RK 16 06/05/14 7-5/8"TEBACK LNR,29.7#. —{ 3061' �! , 2 5072 4913 27 MMG SO RK 20 06/05/14 L-80 FL4S,D=6.875" w ' 3 6464 6109 32 MMG DMY RK 0 12/19/00 .E 4 6927 6506 31 MNG DAY RK 0 12/19/00 I... '.4 5 7389 6905 30 MAG DM' RK 0 12/19/00 Minimum ID = 1.78" @ 8845' 6 7855 7312 28 MMG DMY RK 0 12/19/00 ALUM BUSHING IN DELOY SLV t. + 7 8163 7583 28 MMG DMY RK 0 12/19/00 F' # 8 8505 7887 26 MMG DMY RK 0 12/19/00 +, 9 8781 8136 25 MMG DMY RK 0 12/19/00 .4 TOP OF 7"LNR —{ 7380' i,.. { 7380' {—{8-1/4"SPB PKR w/T1EBK SLV,D=6.313" Ill ii I, 7384' H8-1/4"SEAL ASSY,D=6.25" 7'TIEBACK LNR,29#,L-80 BUTT,D=6.276" —{ 7384' gC Z. �� C 7390' —18-1/4"X 7"LNR HGR,D=6.313" ' 1 8819" —{35 BKR KB LTP,D =1.81"(06/04/14) TOP OF 2-3/8" LNR —{ 8834' IT 8834' 2.70"BKR DEOY SLV,D=_828.24550"10 TOP OF CENBYT _ IMIll _ _ (NOTE ALUM'LBUSHING @ , =1.78 ) ESTIMATED TOC(1991 RWO} H —8900 :+ 4 i '.t 8900" —{7"X 3-1/2"BKR FB-1 PKR,ID=4.000" ;' ; .! 8989' —13-1/2"OTIS XN NP,D=2.75" F+{ ri g '0 9000' H3-1/2"BKR SHEAROUT SUB,D=3.00" 3-1/2"TBG-PC,9.3#,L-80 ELL 8RD-M, —{ 9001' F'•y • " 9001" —3-1/2"WLEG,D=2.992" BEHIND .0087 bpf,D=2.992" '.« 8989' ELMD TT LOGGED 07/23/93 CT LNR 3-1/2"MONOBORE WHIPSTOCK 9615' w/CEMENT SLP(05/12/14) �•g� MLLOUT WINDOW(06-01A) ' 9614'-9620' PERFORATION SUMMARY %. .v w O. 10409' H PUP JOINT w/RA TAG REF LOG:GR!CAL ON 05/23/14 i..- • • * 10901' —{PUP JOI T w/RA TAG ANGLE AT TOP PERF:91'@ 10982' N'�'1 ' jZ,Z.4 I ��` III 4. Note:Refer to Production DB for historical pert data wv.. ill Ail �� � SIZE SPF NTB VAL Opn/Sqz SHOT SOZ P-1' I1 1.56" 6 10982-11042 0 05/22/15 0,, •z •.• 1.56" 6 11042-11102 0 05/21/15 ,y. ,o. �� �.•- .t 1.56" 6 11220-11240 C 05/27/14 �. ,;4• *.* *ik,N. a /9 III . 2-3/8'WFT CBP —{ 1118' �w+� �•�„ - * ,�/il�+t,4I�'e (05/21/15) `* ot'el"+ 4.. AAA Paul �a 7"LNR,29#,L-80 BUTT, .0371 bpf,D=6.184" — 990T r •*•i'•./.4.-" .4'.4•< FB-1D —I 11491' " 111.. It 9-5/8"CSG,47#,NI-80/SOO-95,D=8.681" -{ 9918' 2-3/8"LNR,4.7#,L-80 TH511,.0039 bpf,D=1.995" —H 11530' DATE REV BY CONVENTS DATE REV BY COIVIVINTS PRIDHOEBAY UNIT 10!22/75 PKR 141 ORIGINAL COMPLETION 05/28/15 MWJMD SET CFFYADPERFS(05/21-22/15) WELL 06-01A 06/08/91 N2ES RWO PEWIT No: 2140420 05/29/14 NORDIC 1 CIU SIDETRACK06-01A API No: 50-029-20172-01 ( I 05/29/14 T}-Y PJC FINAL ODE APPROVAL SEC 2,T1ON,R14E,723'FSL&1190'FEL 06/10/14 CJN/PJC SET LTP(06/04/14 06/10/14 CJNPJC GLV C/O(06/05/14) BP Exploration(Alaska)