Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout214-0457. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU H-35A Mill CIBPs Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 214-045 50-029-22600-01-00 11386 Conductor Surface Intermediate Liner Liner 8830 80 3128 8588 290 2974 11350 20" 10-3/4" 7-5/8" 5-1/2" 3-1/4" x 2-7/8" 8838 30 - 110 29 - 3157 28 - 8616 8432 - 8722 8412- 11386 30 - 110 29 - 3129 28 - 8564 8379 - 8668 8359 - 8830 11356 470 2480 5120 6820 11160 None 1490 5210 8180 7740 10570 10305 - 11060 4-1/2" 12.6# 13Cr80 25 - 8435 8898 - 8883 Structural 4-1/2" Baker S-3 Perm Packer 8389, 8336 8389 8336 Torin Roschinger Area Operations Manager Josh Stephens Josh.Stephens@hilcorp.com 907.777.8420 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028284 25 - 8382 N/A N/A 32 577 8027 31996 62 792 1534 2007 193 1214 N/A 13b. Pools active after work:PRUDHOE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations No SSSV Installed By Grace Christianson at 10:26 am, Jun 01, 2023 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.06.01 10:03:56 -08'00' Torin Roschinger (4662) DSR-6/1/23 RBDMS JSB 071823 WCB 1-8-2024 ACTIVITY DATE SUMMARY 5/8/2023 T/I/O = SSV/1480/100. Temp = SI. Bleed IAP (Assist CTU). No AL. IA FL @ 114'. Bled IAP to BT from 1480 psi to 500 psi in 5 min (all gas). No monitor. CTU in control of well upon departure. SV, SSV, WV = C. MV = O. IA & OA = OTG. 16:00 5/8/2023 CTU 9 - 1.75" CT .156" WT - 16,300' Job Scope - Mill 3x CIBP's MIRU CTU 9. MU YJ Venturi Burn Shoe Assembly w/2.24" Shoe. SSV Leaking at Barrel fitting, Valve Shop to Repair Prior to well kill and Trip IH. ***Continue WSR on 5/9/2023*** 5/9/2023 CTU 9. 1.75" CT 0.156". Job Scope: Mill three CIBP's RIH with YJ milling assembly w/ 2.24" Venturi/Burnshoe. Mill BKR CIBP @ 10400'. Worked 2-1/2 hours - only one stall. POOH check tools. BD YJ Venturi/burnshoe. End of burnshoe was ground down. Inside Burnshoe, venturi & screen packed w/ fine black fill. MU 2.24" 3 blade junk mill. RIH. Tag @ 10,427' CTM / 10,433' Mech. Worked for 22 mins and lost all returns (FP surf lines and 5 bbls 60/40 down backside). Total of 1 hour 50 mins and 5 stalls CIBP moving. Work milled CIBP 1 down thru perfs and to 2nd CIBP w/ three stalls. Tag CIBP #2 @ 10,719.4' CTM / 10,725' Mech. ***Continue WSR on 5/10/2023*** 5/10/2023 CTU 9. 1.75" CT 0.156". Job Scope: Mill three CIBP's POH with YJ Milling BHA, 2.300". 2 or 3 overpulls while POH through heel. Mill worn badly at gauge and center from Plug #2. PU YJ 2.280" Venturi Burn Shoe, RIH, Begin pumping max rate through heel on trip IH to flush any debris down to perfs. Continue Milling @ 10714' on Plug #2. Moved Plug #2 down to 10912', continue milling with Venturi Burn Shoe. All returns to formation. Finished milling plug #3. Pushed plug down to PBTD @ 11356 CTMD. POOH freeze protect CT and well. Recovered plug core and various small plug pieces. L/D YJ milling BHA. RDMO ***Job Complete*** 5/11/2023 T/I/O = 1100/500/Vac. Temp = SI. T FL (Ops request). ALP = 2000 psi, SI @ CV. Frost is coating the entire tree. T FL @ 3130' (48 bbls). SV, WV = C. SSV, MV = O. IA & OA = OTG. 10:30 5/18/2023 ***WELL S/I ON ARRIVAL*** (gaslift - for rate) SET 4-1/2" WHIDDON CATCHER ON LTP @ 8398' MD (wcs-43) PULLED BK-DGLV IN ST# 5 @ 5291' MD, REPLACED w/ BK-LGLV PULLED BK-DGLV IN ST # 6 @ 3376' MD, REPLACED w/ BK-OGLV PULLED 4-1/2" WHIDDON CATCHER @ 8398' MD (empty) ***JOB COMPLETE, WELL LEFT S/I, DSO NOTIFIED*** Daily Report of Well Operations PBU H-35A RIH with YJ milling assembly w/ 2.24" Venturi/Burnshoe. Mill BKR CIBP @ 10400'.gy @ Worked 2-1/2 hours - only one stall. POOH check tools. BD YJ Venturi/burnshoe. y End of burnshoe was ground down. MU 2.24" 3 blade junk mill. RIH. Tag @ 10,427' CTM / 10,433' Mech. g j g@ W orked for 22 mins and lost all returns (FP surf lines and 5 bbls 60/40 down ( backside). Total of 1 hour 50 mins and 5 stalls CIBP moving. Work milled CIBP 1 )g down thru perfs and to 2nd CIBP w/ three stalls. Tag CIBP #2 @ 10,719.4' CTM / 10,725' Mech. gg g y Continue Milling @ 10714' on Plug #2. Moved Plug #2 down to 10912', continue g@ g g milling with Venturi Burn Shoe. All returns to formation. Finished milling plug #3. g Pushed plug down to PBTD @ 11356 CTMD David Douglas Hilcorp Alaska, LLC Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 11/04/2022 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTALT#20221104-1 Well API #PTD #Log Date Log Company Log Type Notes AOGCC Eset# PBU H-16B 50029205920200 200065 7/3/2022 Baker RPM/SPN PBU H-25A 50029214780100 216036 7/4/2022 Baker RPM/SPN PBU H-35A 50029226000100 214045 7/4/2022 Baker RPM/SPN REVISED -REDISTRIBUTED PBU P1-06A 50029226950200 222009 7/17/2022 Baker RPM REVISED -REDISTRIBUTED PBU L5-21 50029217320000 187057 7/28/2022 Baker RPM/SPN Please include current contact information if different from above. T37233 T37237 T37234 T37235 T37236 PBU H-35A 50029226000100 2 140 45 7/4 /2022 Bake r RPM/SPN REVIS ED -REDIS TRIBUTED Kayla Junke Digitally signed by Kayla Junke Date: 2022.11.07 16:05:04 -09'00' David Dempsey Hilcorp Alaska, LLC Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.dempsey2@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 09/27/2022 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20220927 Well API #PTD #Log Date Log Company Log Type AOGCC Eset# END 3 31 500292283800 197227 12/13/2021 Baker CH RPM PBU 01-14A 500292028101 209129 7/29/2022 Baker CH SPN PBU 01-15B 500292028702 213190 8/2/2022 Baker CH SPN PBU 01-31 500292162600 186132 7/6/2022 Baker CH SPN PBU 06-04B 500292017902 216092 5/5/2021 Baker CH RPM PBU 06-16A 500292046001 212139 5/3/2021 Baker CH RPM PBU 06-21C 500292080203 221088 6/28/2022 Baker CH MRPM PBU 15-49C 500292265103 215129 8/13/2022 Baker CH MRPM PBU H-05B 500292010602 209100 6/29/2022 Baker CH SPN PBU H-26A 500292148701 214205 7/10/2022 Baker CH SPN PBU H-35A 500292260001 214045 7/4/2022 Baker CH SPN PBU H-38 500292340200 208167 7/19/2022 Baker CH SPN PBU P1-06A 500292269502 222009 7/17/2022 Baker CH MRPM PBU P2-43 500292325000 205024 8/5/2022 Baker CH SPN PBU U-09B 500292114402 214063 8/12/2022 Baker CH SPN PBU W-26A 500292196401 199081 7/23/2022 Baker CH SPN Please include current contact information if different from above. T37052 T37053 T37054 T37055 T37056 T37057 T37058 T37059 T37060 T37061 T37062 T37063 T37064 T37065 T37066 T37067 PBU H-35A 500292260001 214045 7/4/2022 Baker CH SPN Kayla Junke Digitally signed by Kayla Junke Date: 2022.09.29 16:24:46 -08'00' • • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Wednesday, March 7, 2018 7:59 AM To: Regg,James B (DOA);AK, OPS EOC Specialists;AK, OPS GC2 Facility OTL;AK, OPS GC2 Field O&M TL;AK, OPS GC2 OSM;AK, OPS GC2 Wellpad Lead;AK, OPS PCC Ops Lead; AK, OPS Prod Controllers;AK, OPS Well Pad HUQ;AK, OPS Well Pad LV;AK, OPS Well Pad MN;AK, OPS Well Pad RJ;AK, OPS WELL PAD S;AK, OPS Well Pad SW;AK, OPS WELL PAD W;AK, OPS Well Pad Z;Ak, Ops West Area IL;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr;AKOpsProdEOCTL; Frankenburg,Amy; Wellman,Julie Cc: Wallace, Chris D (DOA);AK, GWO Completions Well Integrity;AK,GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, GWO Well Integrity Well Information;AK, OPS FF Well Ops Comp Rep;AKIMS App User;Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Dickerman, Eric; Hibbert, Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey;Obrigewitch, Beau;O'connor, Katherine; Romo, Louis A; Sternicki, Oliver R;Tempel,Joshua;Worthington,Aras J Subject: OPERABLE: Producer H-35A(PTD#2140450) passed Warm TIFL and no indication of IA repressurization All, Producer H-35A(PTD#2140450)was placed Under Evaluation on 02/27/18 for having sustained inner annulus casing pressure above NOL. On 03/02/18 operations brought the well online.On 03/03/18 DHD performed a passing warm TIFL. Follow up monitors have indicated the inner annulus is not repressurizing.The passing TIFL and lack of repressurization means the well meets operability criteria and is now classified as OPERABLE. Plan forward/Work completed 1. Operations—Bring well online-complete 2. DHD—Perform warm TIFL and follow up monitors-complete �,..,. 3. Slickline—(contingent)set DGLVs-cancelled 4. Fullbore—(contingent) perform MIT-IA—cancelled Please respond with any questions. SCANNEDw Ogg . Well Integrity Engineer BP Global Wells Organization-Alaska Office:907-659-8110 From. a K, GWO Well Integrity Engineer Sent: Tue •: February 27, 2018 2:34 PM To: 'Regg, James : 'IA) (jim.regg@alaska.gov)'; AK, OPS EOC Specialists; AK, OPS GC2 Facility OTL; AK, OPS GC2 Field O&M TL; AK, OPS G • AK, OPS GC2 Wellpad Lead; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; AK, OPS Well Pad HUQ; AK, OPS Well Pa. OPS Well Pad MN; AK, OPS Well Pad RJ; AK, OPS WELL PAD S; AK, OPS Well Pad SW; AK, OPS WELL PAD W; AK, OPS .d Z; Ak, Ops West Area TL; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; AKOpsProdEOCTL; Franke :. •, Amy; Wellman, Julie Cc: 'chris.wallace@alaska.gov'; AK, GWO Completions Well Integ •AK, GWO DHD Well Integrity; AK, GWO Projects Well Integrity; AK, GWO SUPT Well Integrity; AK, GWO Well Integrity - formation; AK, OPS FF Well Ops Comp Rep; AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, ael; Janowski, Carrie; Montgomery, Travis J; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Romo, Louis A; Sternic ', *liver R; Tempel, Joshua; 1 • • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Tuesday, February 27, 2018 2:34 PM To: Regg,James B (DOA);AK, OPS EOC Specialists;AK, OPS GC2 Facility OTL;AK, OPS GC2 Field O&M TL;AK, OPS GC2 OSM;AK, OPS GC2 Wellpad Lead;AK, OPS PCC Ops Lead; AK, OPS Prod Controllers;AK, OPS Well Pad HUQ;AK, OPS Well Pad LV;AK, OPS Well Pad MN;AK, OPS Well Pad RJ;AK, OPS WELL PAD S;AK, OPS Well Pad SW;AK, OPS WELL PAD W;AK, OPS Well Pad Z;Ak, Ops West Area TL;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr;AKOpsProdEOCTL; Frankenburg,Amy; Wellman,Julie Cc: Wallace, Chris D (DOA);AK, GWO Completions Well Integrity;AK,GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, GWO Well Integrity Well Information;AK, OPS FF Well Ops Comp Rep;AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey; Obrigewitch, Beau;O'connor, Katherine; Romo, Louis A; Sternicki, Oliver R;Tempel,Joshua;Worthington,Aras J Subject: UNDER EVALUATION: Producer H-35A(PTD#2140450) inner annulus casing pressure above NOL All, Producer H-35A(PTD#2140450)was reported to have inner annulus pressure above NOL on 02/26/18.The pressure was 2,060 psi.The well recently passed a cold TIFL on 02/18/18 but has continued to repressurize since.The repressurization indicates a failure of one or more well barriers.The well has been reclassified as UNDER EVALUATION and is on the 28 day clock for diagnostics and repair. Plan forward: 1. Operations—Bring well online 2. DHD—Perform warm TIFL and follow up monitors 3. Slickline—(contingent) set DGLVs 4. Fullbore—(contingent) perform MIT-IA Please respond if in conflict. SCANEB co Andrew Ogg Well Integrity Engineer BP Global Wells Organization-Alaska Office:907-659-8110 1 STATE OF ALASKA • ()ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations ® Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate ® Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 5e7L 6/9p 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 214-045 3. Address: P.O.Box 196612 Anchorage, Development lI Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-22600-01-00 7. Property Designation(Lease Number): ADL 028284 8. Well Name and Number: PBU H-35A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: ,,, Total Depth: measured 11386 feet Plugs measured 10700,10900 feet true vertical 8830 feet Junkmeasured None feet Effective Depth: measured 10700 feet Packer measured 8392 feet AUG 17 2017 true vertical 8894 feet Packer true vertical 8339 feet AOGCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 32-112 32-112 1490 470 Surface 3128 10-3/4" 31-3159 31-3131 5210 2480 Intermediate 8587 7-5/8" 29-8617 29-8564 8180 5120 Liner 290 5-1/2" 8432-8722 8379-8668 7740 6280 Liner 2988 3-1/4"x 2-7/8" 8398-11386 8345-8830 Perforation Depth: Measured depth: 10440-11060 feet True vertical depth: 8893-8883 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 27-8438 27-8385 Packers and SSSV(type,measured and 4-1/2"Baker S-3 Perm Packer 8392 8339 true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): SCANNED NOV 0 7 2012 Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 372 26004 412 700 1075 Subsequent to operation: 641 7477 1767 1833 272 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory 0 Development IZI Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil H Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data ❑ GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Frankenburg,Amy Contact Name: Shriver,Tyson Authorized Title: Non-Operated Resource Lead Contact Email: Tyson.Shriver@bp.com Authorized Signature:a, Q Date: ' '( ?...,1 (+.Contact Phone: +1 9075644133 Form 10-404 Revised 04/2017 It rL to G 6 1-7-- J Submit Original Only ,4 COM l(7 RBDMS `. v AUG 2 3 2017 • Daily Report of Well Operations H-35A ACTIVITYDATE SUMMARY CTU#8 - 1.50"CT. Job Scope: Log, CIBP,Adperf RU Coil#8. Function test BOP's. Kill well. Drift to 10800ft. Log up from 10800ft to 8250ft, flag pipe at 10650ft. Bled down OA from 600psi to 60psi (all fluid) Logged from 10,800' up to 8200'. Tied into BP PDCL Log updated July 2014 Set CIBP at 10700ft.ME/ 10699.55'Top of plug 7/19/2017 ***In Progress*** CTU#8 - 1.50" CT. Job Scope: Log, CIBP,Adperf RIH w/HES 2"Millenium pert gun (6 spf-60 degree phasing/ 18.3" pen., ent hole .22"). Tie into CIBP at 10700' and perforate interval 10,470' - 10,500'. Pooh. Shots fired, recover ball. MU & RIH with HES 2'x 30' pert gun#2, tie into CIBP at 10700' and perforate 10,440'- 10470'. Pooh. Shots fired, recover ball. Pooh. Freeze protect w/50/50 meoh to 2500'. 7/20/2017 RDMOL TREE= __ 4-1/16" , • H -3 5A SAFETY NOTES: WELL ANGLE>70 @ 9150'*** VLHEAD� Fly CHROME TBG&LNR*** MAX DOGLEG:330 @ ACTUATOR= BAKERC 11341'*** OKE.ELEV= 75.64 I BF.as,/= 47.22' KOP= 2209' 2227' —14-1/2"HES HXO SSSV NP,D=3.813" Max Angle= 103'@ 11341' CI Datum MD= 8939' Datum ND= 8800'SS GAS LFT MANDRELS 10-3/4"CSG,45.5#,L-80 BTRS,D=9.953' -I 3157' ST MD TVD DEV TYPE VLV LATCH FORT DATE 6 3376 3345 7 KBMG-M DOME BK 16 08/06/14 5 5291 5246 3 KBMG-M SO BK 20 08/06/14 4 6548 6501 4 KBMG-M *DMY BK 0 09/13/05 Minimum ID =2.313" @ 8416' 3 7419 7370 4 KBMG M DMY BK 0 10/26/95 2-7/8" X NIP IN LTP STINGER 2 8043 7991 4 KBMG-M DMY BK 0 10/26/95 1 8311 8259 4 KBMG-M *DMY BK 0 07/19/05 *STA#4&#1=DMY VALVES HAVE EXTEM3B3 PACKING ' 8368' H4-1/2"HES X NP,D=3.813" MI 8389' -17-5/8"x 4-1/2"BKR S-3 NKR,D=3.875" 8398' H4-1/2"BKR KB LTP w/PTSA STINGER,D=2.45" =' =' 8402' -14-1/2"FES X NP,D=3.813" 8412' 3.70"DEPLOY SLV,ID=3.00"-DEPTH CORRECTION PER CALM(02/17/15) TOP OF 3-1/4'X 2-7/8"LNR H 8412' 0,, 1111 8416' --I2-7/8"X NP,D=2.313'(INTEGRAL TO LTP STING) 3-112"LNR,9.2#,L-80 STL,.0087 bpf,ID=2.992" -1 8420' r8420' -j 3-1/2"X 3-3/16" XO,D=2.786' ; 41? i, 8423' H4-1/2"HES XN IMP,MLLE()TO 3.80"(06/0414) TOP OF 5-1/2"LNMR --1 8432' I 1 j 11. 8432' H7-5/8"x 5-1/2"BKR 2XP PKR w/6'EXT,D=5,5" 4-1/2"TBG,12.6#,13CR-80 NSCT, 8434' PI 'I.10. 8435' -14-1/2"WLEG,D=3.958" BEHIND .0152 bpf,D=3.958" 9l V 1 ;I V 8418' H ELM)TT LOGGE)11/08/95 CT LNR `1 •4f 8444' --I7-5/8"x 5-1/2"BKR HMC HGR,ID=4.892" �� ►moi 7-5/8"CSG,29.7#,NT-95 NSCC,D=6.875" -1 $616' }- •1 !fi ,NAI V VI Vli tom+ •Ill %I %�1 & LOUT WINDOW (H-35A) 8722'-8734' 4-1/2"X 5-1/2"WI- STOCK(05/29/14) 8720' Oji 8966' 3 114'SHORT JONTw!RA TAG L J-� J w/RA TAG @ 8729' ;I '!a V '4 * [ 9604' I-3-1/4"X 2-7/8"XO,D=2.377" ,1 5-12"LNR,17#,13CR 80 NSCC, -8720 .11.4". Nis, *�� •�. 10001' 2-718"SHORT PUP .0232 bpf,D=4892" - - -h�`0 �!�`` JOINT w/RA TAG -t _ •d' . 5-12"POSISET PLUG(05/29/14) -- 8800' I ♦. �' '�.�. �•�����: 10700'CTM -12-7/8"WFO -4.%_,,• CBP(7/19/17) PERFORATION SUMMARY a`�,'` RE=LOG:GRI OCU RFM 07/26/14 3-1/4"LNR 6.6#,L-80 TC11, 9604' �izN �. ANGLE AT TOP PERF:89'@ 10440' .0079 bpf,D=2.85" „Vali... ,.� Note:Refer Production DB for historical pert data 2-7/8'WFD CEP(10/10/15) -I 10900' ' ��.,�..", SIZE SPF NPBTD -I 11350' TBRVAL Opn/Sgz SHOT SQZ "'4P.. 2" 6 10440-10470 0 07/20/17 2" 6 10470-10500 0 07/20/17 2-7/8"LNR, 6.5#,L-80 STL,.0058 bpf,D=2-441" H 11386' 2" 6 10800-10850 C 07/28/14 2" 6 11010-11060 C 07/28/14 DATE REV BY COMMENTS DATE REV BY COMIVENfS FRIAHOE BAY UNIT 10/25/95 N2E5 IMTIAL COMPLETION 03/03/15 STF/,Mu) SET LTPw/STINGER& X NP(2/17-18/15) WELL: H-35A 07/28/14 NORDIC CTD SIDETRACK(H-35A) 11/05/15 ALMJMO SET CIBP(10/1C/15) PHRMT No:12140450 08/01/14 PJC DRLG DRAFT CORRECTIONS 07/24/17 M5S/JMJ SET CIBP&ADPERFS API Nb: 50-029-22600-01 08/04/14 TF/PJC FNAK ODEAPPROVAL SEC 21,T11N,R13E,745'FNL&1266'FE- 0822/14,IvIV/JMD GLV GO(08/06/14) 01/20/15 DGS/JM)TBG CORRECTION BP Exploration(Alaska) STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMMI N * REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations ® Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend ❑ Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: ,SG f el8' " 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 214-045 3. Address: P.O.Box 196612 Anchorage, Development El Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-22600-01-00 7. Property Designation(Lease Number): ADL 0028284 8. Well Name and Number: PBU H-35A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 11386 feet Plugs measured 10900 feet !RECEIVED true vertical 8830 feet Junk measured feet 0 Effective Depth: measured 10900 feet Packer measured See Attachment feet N O V 6 2015 true vertical_ 8897 feet Packer true vertical See Attachment feet AO CC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 78 20"91.5#H-40 31-109 31-109 1490 470 Surface 3128 10-3/4"45.5#L-80 30-3158 30-3130 5210 2480 Intermediate 8587 7-5/8"29.7#NT-95 29-8617 29-8564 8180 5120 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 10800 10850 feet 11010-11060 feet True vertical depth: 8898-8898 feet 8888-8883 feet SCANNED JAN 2 9 2016 Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr8 26-8437 26-8384 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 652 37814 419 767 1002 Subsequent to operation: Shut-In 1020 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations I3 Exploratory 0 Development Q Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil IZ1 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature ), (1, €--- Phone +1 907 564 4424 Date 11/6/15 vn— /-2-/-7-/ c5 �v Form 10-404 Revised 5/2015 / ��� RBDMS INV 10 2015 Submit Original Only • • Packers and SSV's Attachment PBU H-35A SW Name Type MD TVD Depscription H-35A TBG PACKER 8389 8336.4 4-1/2" Baker S-3 Perm Packer H-35A TBG PACKER 8389.99 8337.39 4-1/2" Baker S-3 Perm Packer H-35A PACKER 8438.92 8386.19 5-1/2" BAKER ZXP PACKER • • m .o D o O o 0 R co N N CO O CO N Ln 0 N Ln CO I� U y 0 0 0 O O O O Cr) CO N N U') co co f� O co O O V co N CO CD "4- CO CO CO CO CO CO CO O N— Ln CO CA C) O CO CO CO CO CO CO CO CO H CO CO O N O O V (.fl CO CO O M M N M M M O) N CO CO CO CO C a) OO r` O V N O Ln N O N co co CO CO CO CO 0 0 CO CO p (a Q Q L OMcr (+r) O CA O N co O CO co co N V V (.0 N _ = O O CO Cr) Cn o F— a Oo o Co 0000 0Oo co coin Z 4# 1# NL*jln *ka0 � *k `nc(0 • r O U O M N N N N O M N r �- lnM Ln 4 t +-' co N- O N D co N O O co co C N CO N- 'yr J M CO N r CO W C C F W ' W U U co 0 CC CC CC c Z Z W W W W W m Q DF- _Z Z_ Z_ Z_ D U CA Z J J J J H 0 0 • _1 U \ U• DG CU b CV ƒ & Eo \ $ /• 21 _0 aE@ , 0, 0_ 7 \ 2 § >< 'Cr) / % ( ƒ \ / % _ 2 o E / = a ■C 7 § ) ° / E / e ? E co 2 2a-\ / % E CL 2 E - \ / \ H 2 � � � �� � / - Q \ f \ E _ 3 2 36b / b 0. \o %/ $ƒ% 0o / £ \ 99 / cm c d COCe \\ / / t c e @ CO 0 CL = CV (3) / \ 5 H 2 / / ? ƒ f 2 g a) ° a \ _ $ s to N. E F/ a_ ) / w 2 \ C / / D e e 3 0)\ G 0 0- o $ \ 0_ o f O / 2 \ a / / / f = 2 ._ ,.CD = % / 7 � \ & f ƒ 5 i O E E s t 2 ƒ 2 < r r < / (N ( / \ / 3 6 I � ,- A / \ O < TREE= 4-1/16'(NV%Ma11-EAD= FAC 0 H -3 -Y 5A S NOTES: WELL ANGLE>70 @ 9150' -- **• CME TBG&LNR*** MAX DOGLEG:33° ACTUATCA= BAKER C 11341 "' I tiKB.13_EV= 75.64 I BF.ELB/= 47.22' _ KOP= 2209' 222T —14-1/2"HES WO SSSV NP,ID=3.813' Max Angle= 103 @11341' 0 Datum MD= 8939' Datum TVD= 8800'SS GAS LFT MANDRELS 10-3/4'CSG,45.5#,L-80 BTRS,ID=9.953' --1 310T k ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 6 3376 3345 7 KBMG-M DONE BK 16 08/06/14 5 5291 5246 3 KBMG-M SO BK 20 08/06/14 4 6548 6501 4 KBM3-M "GUY BK 0 09/13/05 Minimum ID =2.313" @ 8416' 3 7419 7370 4 KBMG-M [NY BK 0 10/26/95 2 8043 7991 4 KBM3-M OW BK 0 10/26/95 2-7/8" X NIP IN LTP STINGER 1 8311 8259 4 KBNE,-M *DMY BK 0 07/19/05 •STA N4&#1=DMY VALVES HAVE EXTENDED PACKING 8368' —14-1/2"HES X MP,ID=3.813" M 11„......._-4..- 8389' H7-5/8"x 4-1/7 BKR 5-3 PKR,I).3.875' 8398' —14-1/2'BKR KB LTP w/PISA S71\IGER,I)=2.45' 8402' —14-1/7 HES X NP,13=3.813" ! ! 8412' —3.70"DEPLOY SLV,ID=3.00"-DEPTH CORRECTION PER CALIFER(02/17/15) TOP OF 3-1/4"X 2-7/8'LNIR H 8412' ; g 8416' J-2-7/B"X.--NP,D=2313"(NTEGRAL TO LIP STN ] 3-1/2"LNR,9.2#,L-80 STL,.0087 bpf,D=2,992" --I 8420' 8420' —3-1/2'X 3-3/16' X0..ID=2.786" 1 0 — _ 8423' —14-1/2"FES XN MP,MLLBD TO 3.80'(06/0414) TOP OF 5-1/2"LNR H 8432" bi 0 1 ------ 8437 H7-5/8"x 5-1/2"BKR ZXP PKR w/6'EXT,E)=5,5' 4-1/2'TBG,12.6#,130R-80 NSCT, 8434' .• Alw. ',"-- 843S 1/7 IM_EG,ID=3. 1 BEHIND $ P i '.:t.. MUM--1H 4-ELK)TT LOGGED 11/08/95 CT LNR :. ...._.......„___ 8444' —17-5/8"x 5-1/2'BKR I-MC FIGR ID=4 892" P $ 7-5/8'CSG,29.7#,NT-95 NSCC,ID=6.875" — %iv }-4 $.4 k _ -to MLLOLIT WNDOW (H-35A) 8722'-8734' 4 lib. 4-1/7 X 5-1/7 W-IFSTOCK(05/29/14) 8720' 1 4'' WI RA TAG(4 8729' %1 • 8966' —13-1/4"SHORT PUP JOINT w/RA TAG "No.31. '1141ri 4,c.„4 b." 5-1/2"LNR 17#,13CR-80 NSCC, "8720 9604' —13-114"X 2-7/8"XO,ID=2.377' .0232 bpf,I)=4.892" .....,,....__ 5-1/7 POSISET PLUG(05/29/14) — 6800' MilrE 4.1. .,_#*‘,0 10001' 12.7/8"SHORT PUP 1q19 INk.... JOWT w/RA TAG PERFORATION SUMVARY 4444-„qt, Nii..44k REF LOG:GRI CCU RPM 07/26/14 3-1/4"LW,6.6#,L-80 TCI 1, 9604' 'Illtw fit ANGLE AT TOP P .0079 bpf,D=2.85' ERF:88° ., 10800' A7.04.1,44. Wife:Refer to Production DB for historical perf data 2-7/8'WFD CEP(10/10/15) 10900' SIZE SPF INTERVAL Opn/Sqz SHOT SQZ PBTD H 11360' 2" 6 10800- 10850 0 07/28/14 2" 6 11010- 11060 C 07/28/14 2-7/8'LNR, 6,5#,L-80 STL,.0058 bpf,ID=2,441" H 11386' DATE REV BY COMMENTS - DATE REV BY COMM:NTS FRUDHOE BAY UNIT 10/25/95 N2E5 INITIAL COMPLETION 03/03/15 SIF/JM) SET LTPw/STNGFIR& MVP(2/17-18/15) IA'El...L H-35A 07/28/14 NORDIC CM SIDETRACK(H-35A) 11/05/15 ALIKIND SET( P(10/10/15) FERMI'No:12140450 08/01/14 PJC DREG CRAFT CORRECTIONS AR No: 50-029-22600-01 08/04/14 TH/PJC RNAK 00E AFFROVAL SEC 21,T11N,R13E,745'FM_&1266'Fa 08/22/14 144,NJMD GLV GO(08/06/14) 01/20/15 DGS/JMY113G CORRECTION 13P Exploration(Alaska) • STATE OF ALASKA t •SKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1 Operations Abandon H Repair Well U Plug Perforations H Perforate H Other U Set LTP Performed Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat.Shutdowns Stimulate-Other ❑ Re-enter Suspended Well❑ 2 Operator 4 Well Class Before Work: 5 Permit to Drill Number Name BP Exploration(Alaska),Inc Developments Exploratory ❑ 214-045-0 3 Address P 0 Box 196612 Stratigraphic❑ Service ❑ 6.API Number Anchorage,AK 99519-6612 50-029-22600-01-00 7 Property Designation(Lease Number) 8 Well Name and Number ADL0028284 PBU H-35A 9 Logs(List logs and submit electronic and printed data per 20AAC25 071). 10 Field/Pool(s) PRUDHOE BAY,PRUDHOE OIL 11 Present Well Condition Summary Total Depth measured 11386 feet Plugs measured None RECEIVED true vertical 8829 B3 feet Junk measured None feet MAR 2 3 2015 Effective Depth measured 11350 feet Packer measured See Attachment feet true vertical 8837 87 feet true vertical None feet yj/J(3CC Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 81 20"91 5#H-40 29-110 29-110 1490 470 Surface See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Intermediate None None None None None None Production 8588 7-5/8"29 7#NT-95HS 28-8616 28-8562 76 8180 5120 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 10800-10850 feet 11010-11060 feet True Vertical depth 8897 58-8898 44 feet 8888 42-8882 97 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12 6#13Cr80 25-8435 25-8382 28 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12 Stimulation or cement squeeze summary Intervals treated(measured) r SCANNED 1 Treatment descriptions including volumes used and final pressure: A. &� 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 659 32346 90 0 1505 Sybsequent to operation 933 42577 121 0 1142 14 Attachments 15 Well Class after work Copies of Logs and Surveys Run Explorator,❑ Development Q Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16 Well Status after work Oil U Gas U WDSPLIJ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG❑ 17 I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C 0 Exempt N/A Contact Nita Summerhays Email Nita.Summerhays[a�bp.com Printed Name Nita ummerhaysn Title Petrotechnical Data Engineer Signatur- 7ii�� ����.— e Phone 564-4035 Date 3/23/2015 „/I/, '//moi --� . .--- - 1TL- ¢l / //5- RBDM APR - 3 2015 /It `�/7/-- Form 10-404 Revised 10/2012 Submit Original Only Daily Report of Well Operations ADL0028284 AQ ITY TF EKY _,..,-.. ,.._..._._. .k.v ,.: .., . w .....::�a,�.�.ae�;....w...,c.,,6a',..< .�.... ..c _�...�"c`�..,:....,;6� ._. 2/14/2015 Cost Place Holder. Machine X-over and no go sub for Weglinator for LTP. 2/17/2015 Fluid support ***WELL FLOWING ON ARRIVAL****(Profile Mod) RAN 2.75"CENT, 2,50"S. BAILER, TO 8850'SLM (no recovery) RAN 2.25"CENT, PDS 24 CALIPER, MADE TWO PASSES OVER DEPLOYMENT SLV AT 50'/MIN AND 60/MIN FROM 8,500 SLM TO 8,200'SLM 2/1712015 ***CONTINUE ON 2015*** ***CONTINUE FROM 2/17/2015*** (profile modification) LRS LOAD TBG W/ 180 BBLS OF CRUDE BRUSH TBG TO DEPLOYMENT SLV AT 8388' SLM DRIFT TO DEPLOYMENT SLV W/PTSU DRIFT AT 8384' SLM SET PTSA STINGER IN DEPLOYMENT SLV AT 8384' SLM SET BAKER 45 KB PACKER W/6' PUP JOINT AND QCLLAT 8,385' SLM SET 2-7/8"XX-PLUG IN X-NIPPLE IN LTP AT 8,387' SLM (lih =23', 4 x 1/2" ports) 2/18/2015 ***CONTINUE ON 2/19/2015*** T/I/O=2460/462/0 TEMP= SI Assist Slickline, Loaded TBG with 5 bbls Meth Spear followed by 180bbIs Crude. Pumped 27 bbls of crude assisting Sline to set Liner. Pumped 3 bbls 2/18/2015 pressuring up on TBG for MITxT ***Job cont to 2-19-15 WSR*** ***CONTINUE FROM 2/18/2015*** (profile modification) LRS PERFORMED PASSING MIT-T TO 2000psi PULL 2-7/8" PLUG BODY FROM X-NIPPLE IN LTP AT 8,387' SLM 2/19/2015 ***JOB COMPLETE, PAD OP NOTIFIED, WELL SHUT IN ON DEPARTURE*** ***Job cont. r 2-18-15 WSR*** ( MITxT 2000 psi) Pumped 4 bbls of 60*crude down TBG to obtain a 2000 psi MITxT . 1st 15min TBG lost 43 psi / 2nd 15 min TBG lost 20 psi . Total loss was 63 psi for a passing test.. Bleed TBG down to 500 psi per Sline WSL. SLine in control of well upon LRS departure. DSO notified of well Status. MIT cation tags hung on MV CV's 2/19/2015 =OTG FWHP's= 500/456/0 FLUIDS PUMPED BBLS I DIESEL 4 METH 220 CRUDE 225 TOTAL 0) • 0 0 0m 0 00 00 O 0 0 0 m O. m a0 N a0 N t Ln C O Lf) N N N- 0 y 0 0 0 0 0 0 0 0 - 0) - N t Lo0 a0 = — M m c- O— m O— co Lf) Lf) m N LC) I— M O N K co M (O M (0 N- N- N- N = I� 00 0) N 00 c0 N (0 a0 M N (0 N N 00 M O (0 00 Ln = M co 00 a0 a0 a0 M M co H M M N M co O (0 co N N N N M M M M M c0 M ( C — c- aO m 00 00 M M ao C.) CO d' DI , N Co rnocv ((ioaommm N N V d- (0 N N N N 1- 9U0 CD 00 c0 LLU (0oo °O v oo CO COJ (� C Ji J M Jt CL)Cn NinN (0 L% • Z LU LL() •C 1-•• * 1010 O CO r" (fl V "4" N U O N V N -a\0 N L() L0 r +-' V O N a0 a0 00 O C)I- 0) c0 aO M N N ' O C aO LU V N NN- e0 M M ao J Z O O • H- I- ww CO D : Q Q O UOWIYCYfY0LLLLZ Zw Ww W 000 O ZJDD O J J J J Q- Cn CJ) H Packers and SSV's Attachment ADL0028284 SW Name Type MD TVD Depscription H-35A PACKER 8389 8336.4 4-1/2" Baker S-3 Perm Packer H-35A PACKER 8432 8379.29 5-1/2" BAKER ZXP PACKER TR .EE T1 = • 4-1/16"aVV WELLFEAD= FAC H -3 5A SAFETY NOTES: WELL ANGLE>70 @ 91 50'*** CHROME TBG& LNR ** MAX DOGLEG:3 3*@ ACTUATOR= BAKER C 1 1 341'••• 0103. ELEV= - 75.64 :i KOP= — 2209I BF.ELEV= 4722' { 2227' —4-1/2"HES FiX0 SSSV NP,O=3.813" ' Max Angle= 103°@ 11341' Datum M3= 8939' [ tum*6= 8800SS GAS LFT MANDRELS 10-3/4"CSG,45.5#,L-80 BTRS,ID=9.953" — 3157' ST MD TVD DEV TYPE VLV LATCH PORT DATE 6 3376 3345 7 KBMG-M COME BK 16 08/06/14 5 5291 5246 3 KBMG-M SO BK 20 08/06/14 L 4 6548 6501 4 KBMG-M *DMY BK 0 09/13/05 3 7419 7370 4 KBMS-M DMY BK 0 10/26/95 Minimum ID = 2.313" @ 8416' 2 8043 7991 4 KBMG-M DMY BK 0 10/26/95 2-7/8" X NIP IN LTP STINGER 1 8311 8259 4 KI3MG-M "[MY BK 0 07/19/05 `STA#4&#1=MAY VALVES HAVE ENDED PACKING I 8368' —4-1/2"FES X IsW,ID=3.813" >< 8389' H7-518'x 4-1/2"BKR S-3 PKR,()=3.875" -1 4-1/2'BKR KB LW w/PTSA STINGER,ID=2.45' .g 8402' —4-1/2-HES X NP,ID=3.813" 8412' —3.70-DEPLOY SLV,ID=3 00"-DEPTH CORRECTION FER CA LFER(02/17/15) TOP OF 3-1/4"X 2-7/8"LNR — 8412' 1 - %i 8416' —I2-7/8-X NP,ID=2.313"(I'JTEGRAL TO LW STIs1G) I 1. 3-1/2"LNR,9.2#,L-80 STL, .0087 bpf,ID=2.992" —1--8420' i \ ; A 8420' —3-1/2'X 3-3/16" XO,ID=2.786" TOP OF 5-1/2"LNR H 8432' 4 .. 8423' —4-1/2"HES XN NIP,MLLE")TO 3.80'(06/0414) i I I. .• 8437 H7-5/8"x 5-1/2"BKR ZXP PKR w/6'EXT,ID=5,5' 1 4-1/2"TBG, 12.64t, 13CR-80 NSCT, — 8434' to :;.,M 8435' —4-1/2"WLEG,ID=3.956' BEHIND .0152 bpf,D=3.958" 1:10 •4-1 , 1,.. .: CT LNR • 1 P 41A••• 8418' H ELMD TT LOGGED 11/08/95 1 rior ,.. .--,- 8444' —7-5/8-x 5-1/2"BKR HMC HGR,ID=4.892" 1 V El•.4 _ kj '9-4 7-5/8"CSG,29.7#,NT-95 NSCC,ID=6.875" — 8616' 1—A F•ie 47:4 V .1,.. • ••• bp 4,A •4' MLLOUT WINDOW (H-35A) 8722'-8734' 4-1/2"X 5-1/2"W-IFSTOCK(05/29/14) —1 8720' V k, lk ;,:k., WI RA TAG @ 8729' i8966' —13-1/4"SHORT RIP JONI w/RA TAG •.. 5-1/2"LNR,17#,13CR-80 NSCC, — —8720 -4. 9604' H 3-1/4"X 2-7/8"X0,D=2.377' .0232 bpf,ID=4.892' 5-1/2"FOSISET FL UG(05/29/14) — 8800' ..a-wwiINF, Ai.',0, 10001' 12.7/8"SHORT FVP ._— W Alliew. .. * , JOINT w/RA TAG AWA -....... .ir...- .Nramit#47:--., .44., PERFORATION SUMARY REF LOG:GR/OM RPM 07/26/14 3-1/4"LW,6.6#,L-80 TC11, —1 9604' ANGLE AT TOP FURF:88°@ 10800' .0079 bpf,ID=2.85" 4411..Not AI ,..kr..Ne. Note:Refer to Production 013 for histoncal perf data Alp iikii-:- SEE SPF INTERVAL Opn/Sqz SHOT , SCIZ FM-B---TD 1-1 11350' 2- 6 10800-10850 0 07/28/14 2" 6 11010-11060 0 07/28/14 2-7/8"LNR, 6 5#,L-80 SIL,.0058 bpf,ID=2.441" H 11386' DATE REV BY COMkiENTS DATE REV BY COMENTS ] PRUDHOE BAY UNfT 10/25/95 N2E5 INITIAL COM PLET1ON 03/03/15 STE/J11/4() SET LTPw/STNGER& X NIP(2/17-18/15) WELL: H-35A 07/28/14.NORDIC i CTD SIDETRACK(1435A) PERMIT ND.'2140450 08/01/14 PJC DRLG DRAFT CORRECTIONS ARI'b' 50-029-22600-01 08/04/14 TI-VPJC FlNAK ODE APPROVAL SEC 21,T11N, R13E, 745'FM_&1266'FE_ 08/22/14 JMMcJACIGLV 00(08/06/14) 01/20/15.DGS/JAC TBG CORRECTION ' BP Exploration(Alaska)k a)