Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout214-0457. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU H-35A
Mill CIBPs
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
214-045
50-029-22600-01-00
11386
Conductor
Surface
Intermediate
Liner
Liner
8830
80
3128
8588
290
2974
11350
20"
10-3/4"
7-5/8"
5-1/2"
3-1/4" x 2-7/8"
8838
30 - 110
29 - 3157
28 - 8616
8432 - 8722
8412- 11386
30 - 110
29 - 3129
28 - 8564
8379 - 8668
8359 - 8830
11356
470
2480
5120
6820
11160
None
1490
5210
8180
7740
10570
10305 - 11060
4-1/2" 12.6# 13Cr80 25 - 8435
8898 - 8883
Structural
4-1/2" Baker S-3 Perm Packer 8389, 8336
8389
8336
Torin Roschinger
Area Operations Manager
Josh Stephens
Josh.Stephens@hilcorp.com
907.777.8420
PRUDHOE BAY, PRUDHOE OIL
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028284
25 - 8382
N/A
N/A
32
577
8027
31996
62
792
1534
2007
193
1214
N/A
13b. Pools active after work:PRUDHOE OIL
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
No SSSV Installed
By Grace Christianson at 10:26 am, Jun 01, 2023
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662),
ou=Users
Date: 2023.06.01 10:03:56 -08'00'
Torin Roschinger
(4662)
DSR-6/1/23
RBDMS JSB 071823
WCB 1-8-2024
ACTIVITY DATE SUMMARY
5/8/2023
T/I/O = SSV/1480/100. Temp = SI. Bleed IAP (Assist CTU). No AL. IA FL @ 114'.
Bled IAP to BT from 1480 psi to 500 psi in 5 min (all gas). No monitor. CTU in
control of well upon departure.
SV, SSV, WV = C. MV = O. IA & OA = OTG. 16:00
5/8/2023
CTU 9 - 1.75" CT .156" WT - 16,300' Job Scope - Mill 3x CIBP's
MIRU CTU 9. MU YJ Venturi Burn Shoe Assembly w/2.24" Shoe. SSV Leaking at
Barrel fitting, Valve Shop to Repair Prior to well kill and Trip IH.
***Continue WSR on 5/9/2023***
5/9/2023
CTU 9. 1.75" CT 0.156". Job Scope: Mill three CIBP's
RIH with YJ milling assembly w/ 2.24" Venturi/Burnshoe. Mill BKR CIBP @ 10400'.
Worked 2-1/2 hours - only one stall. POOH check tools. BD YJ Venturi/burnshoe.
End of burnshoe was ground down. Inside Burnshoe, venturi & screen packed w/
fine black fill. MU 2.24" 3 blade junk mill. RIH. Tag @ 10,427' CTM / 10,433' Mech.
Worked for 22 mins and lost all returns (FP surf lines and 5 bbls 60/40 down
backside). Total of 1 hour 50 mins and 5 stalls CIBP moving. Work milled CIBP 1
down thru perfs and to 2nd CIBP w/ three stalls. Tag CIBP #2 @ 10,719.4' CTM /
10,725' Mech.
***Continue WSR on 5/10/2023***
5/10/2023
CTU 9. 1.75" CT 0.156". Job Scope: Mill three CIBP's
POH with YJ Milling BHA, 2.300". 2 or 3 overpulls while POH through heel. Mill worn
badly at gauge and center from Plug #2. PU YJ 2.280" Venturi Burn Shoe, RIH,
Begin pumping max rate through heel on trip IH to flush any debris down to perfs.
Continue Milling @ 10714' on Plug #2. Moved Plug #2 down to 10912', continue
milling with Venturi Burn Shoe. All returns to formation. Finished milling plug #3.
Pushed plug down to PBTD @ 11356 CTMD. POOH freeze protect CT and well.
Recovered plug core and various small plug pieces. L/D YJ milling BHA. RDMO
***Job Complete***
5/11/2023
T/I/O = 1100/500/Vac. Temp = SI. T FL (Ops request). ALP = 2000 psi, SI @ CV.
Frost is coating the entire tree. T FL @ 3130' (48 bbls).
SV, WV = C. SSV, MV = O. IA & OA = OTG. 10:30
5/18/2023
***WELL S/I ON ARRIVAL*** (gaslift - for rate)
SET 4-1/2" WHIDDON CATCHER ON LTP @ 8398' MD (wcs-43)
PULLED BK-DGLV IN ST# 5 @ 5291' MD, REPLACED w/ BK-LGLV
PULLED BK-DGLV IN ST # 6 @ 3376' MD, REPLACED w/ BK-OGLV
PULLED 4-1/2" WHIDDON CATCHER @ 8398' MD (empty)
***JOB COMPLETE, WELL LEFT S/I, DSO NOTIFIED***
Daily Report of Well Operations
PBU H-35A
RIH with YJ milling assembly w/ 2.24" Venturi/Burnshoe. Mill BKR CIBP @ 10400'.gy @
Worked 2-1/2 hours - only one stall. POOH check tools. BD YJ Venturi/burnshoe. y
End of burnshoe was ground down.
MU 2.24" 3 blade junk mill. RIH. Tag @ 10,427' CTM / 10,433' Mech.
g
j g@
W orked for 22 mins and lost all returns (FP surf lines and 5 bbls 60/40 down (
backside). Total of 1 hour 50 mins and 5 stalls CIBP moving. Work milled CIBP 1 )g
down thru perfs and to 2nd CIBP w/ three stalls. Tag CIBP #2 @ 10,719.4' CTM /
10,725' Mech.
gg g y
Continue Milling @ 10714' on Plug #2. Moved Plug #2 down to 10912', continue g@ g g
milling with Venturi Burn Shoe. All returns to formation. Finished milling plug #3. g
Pushed plug down to PBTD @ 11356 CTMD
David Douglas Hilcorp Alaska, LLC
Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: (907) 777-8337
E-mail: david.douglas@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
Date: 11/04/2022
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
SFTP DATA TRANSMITTALT#20221104-1
Well API #PTD #Log Date Log
Company Log Type Notes AOGCC
Eset#
PBU H-16B 50029205920200 200065 7/3/2022 Baker RPM/SPN
PBU H-25A 50029214780100 216036 7/4/2022 Baker RPM/SPN
PBU H-35A 50029226000100 214045 7/4/2022 Baker RPM/SPN
REVISED -REDISTRIBUTED
PBU P1-06A 50029226950200 222009 7/17/2022 Baker RPM
REVISED -REDISTRIBUTED
PBU L5-21 50029217320000 187057 7/28/2022 Baker RPM/SPN
Please include current contact information if different from above.
T37233
T37237
T37234
T37235
T37236
PBU H-35A 50029226000100 2 140 45 7/4 /2022 Bake r RPM/SPN REVIS ED -REDIS TRIBUTED
Kayla
Junke
Digitally signed by
Kayla Junke
Date: 2022.11.07
16:05:04 -09'00'
David Dempsey Hilcorp Alaska, LLC
Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: (907) 777-8337
E-mail: david.dempsey2@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
Date: 09/27/2022
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
SFTP DATA TRANSMITTAL T#20220927
Well API #PTD #Log Date Log
Company
Log
Type AOGCC Eset#
END 3 31 500292283800 197227 12/13/2021 Baker CH RPM
PBU 01-14A 500292028101 209129 7/29/2022 Baker CH SPN
PBU 01-15B 500292028702 213190 8/2/2022 Baker CH SPN
PBU 01-31 500292162600 186132 7/6/2022 Baker CH SPN
PBU 06-04B 500292017902 216092 5/5/2021 Baker CH RPM
PBU 06-16A 500292046001 212139 5/3/2021 Baker CH RPM
PBU 06-21C 500292080203 221088 6/28/2022 Baker CH MRPM
PBU 15-49C 500292265103 215129 8/13/2022 Baker CH MRPM
PBU H-05B 500292010602 209100 6/29/2022 Baker CH SPN
PBU H-26A 500292148701 214205 7/10/2022 Baker CH SPN
PBU H-35A 500292260001 214045 7/4/2022 Baker CH SPN
PBU H-38 500292340200 208167 7/19/2022 Baker CH SPN
PBU P1-06A 500292269502 222009 7/17/2022 Baker CH MRPM
PBU P2-43 500292325000 205024 8/5/2022 Baker CH SPN
PBU U-09B 500292114402 214063 8/12/2022 Baker CH SPN
PBU W-26A 500292196401 199081 7/23/2022 Baker CH SPN
Please include current contact information if different from above.
T37052
T37053
T37054
T37055
T37056
T37057
T37058
T37059
T37060
T37061
T37062
T37063
T37064
T37065
T37066
T37067
PBU H-35A 500292260001 214045 7/4/2022 Baker CH SPN
Kayla Junke
Digitally signed by
Kayla Junke
Date: 2022.09.29
16:24:46 -08'00'
• •
Wallace, Chris D (DOA)
From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com>
Sent: Wednesday, March 7, 2018 7:59 AM
To: Regg,James B (DOA);AK, OPS EOC Specialists;AK, OPS GC2 Facility OTL;AK, OPS GC2
Field O&M TL;AK, OPS GC2 OSM;AK, OPS GC2 Wellpad Lead;AK, OPS PCC Ops Lead;
AK, OPS Prod Controllers;AK, OPS Well Pad HUQ;AK, OPS Well Pad LV;AK, OPS Well
Pad MN;AK, OPS Well Pad RJ;AK, OPS WELL PAD S;AK, OPS Well Pad SW;AK, OPS
WELL PAD W;AK, OPS Well Pad Z;Ak, Ops West Area IL;AK, RES GPB East Wells Opt
Engr;AK, RES GPB West Wells Opt Engr;AKOpsProdEOCTL; Frankenburg,Amy;
Wellman,Julie
Cc: Wallace, Chris D (DOA);AK, GWO Completions Well Integrity;AK,GWO DHD Well
Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, GWO Well
Integrity Well Information;AK, OPS FF Well Ops Comp Rep;AKIMS App User;Cismoski,
Doug A; Daniel, Ryan; Dempsey, David G; Dickerman, Eric; Hibbert, Michael;Janowski,
Carrie; Montgomery,Travis J; Munk, Corey;Obrigewitch, Beau;O'connor, Katherine;
Romo, Louis A; Sternicki, Oliver R;Tempel,Joshua;Worthington,Aras J
Subject: OPERABLE: Producer H-35A(PTD#2140450) passed Warm TIFL and no indication of IA
repressurization
All,
Producer H-35A(PTD#2140450)was placed Under Evaluation on 02/27/18 for having sustained inner annulus casing
pressure above NOL. On 03/02/18 operations brought the well online.On 03/03/18 DHD performed a passing warm
TIFL. Follow up monitors have indicated the inner annulus is not repressurizing.The passing TIFL and lack of
repressurization means the well meets operability criteria and is now classified as OPERABLE.
Plan forward/Work completed
1. Operations—Bring well online-complete
2. DHD—Perform warm TIFL and follow up monitors-complete �,..,.
3. Slickline—(contingent)set DGLVs-cancelled
4. Fullbore—(contingent) perform MIT-IA—cancelled
Please respond with any questions.
SCANNEDw Ogg
.
Well Integrity Engineer
BP Global Wells Organization-Alaska
Office:907-659-8110
From. a K, GWO Well Integrity Engineer
Sent: Tue •: February 27, 2018 2:34 PM
To: 'Regg, James : 'IA) (jim.regg@alaska.gov)'; AK, OPS EOC Specialists; AK, OPS GC2 Facility OTL; AK, OPS GC2
Field O&M TL; AK, OPS G • AK, OPS GC2 Wellpad Lead; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; AK,
OPS Well Pad HUQ; AK, OPS Well Pa. OPS Well Pad MN; AK, OPS Well Pad RJ; AK, OPS WELL PAD S; AK, OPS
Well Pad SW; AK, OPS WELL PAD W; AK, OPS .d Z; Ak, Ops West Area TL; AK, RES GPB East Wells Opt Engr; AK,
RES GPB West Wells Opt Engr; AKOpsProdEOCTL; Franke :. •, Amy; Wellman, Julie
Cc: 'chris.wallace@alaska.gov'; AK, GWO Completions Well Integ •AK, GWO DHD Well Integrity; AK, GWO Projects
Well Integrity; AK, GWO SUPT Well Integrity; AK, GWO Well Integrity - formation; AK, OPS FF Well Ops Comp Rep;
AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, ael; Janowski, Carrie; Montgomery,
Travis J; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Romo, Louis A; Sternic ', *liver R; Tempel, Joshua;
1
• •
Wallace, Chris D (DOA)
From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com>
Sent: Tuesday, February 27, 2018 2:34 PM
To: Regg,James B (DOA);AK, OPS EOC Specialists;AK, OPS GC2 Facility OTL;AK, OPS GC2
Field O&M TL;AK, OPS GC2 OSM;AK, OPS GC2 Wellpad Lead;AK, OPS PCC Ops Lead;
AK, OPS Prod Controllers;AK, OPS Well Pad HUQ;AK, OPS Well Pad LV;AK, OPS Well
Pad MN;AK, OPS Well Pad RJ;AK, OPS WELL PAD S;AK, OPS Well Pad SW;AK, OPS
WELL PAD W;AK, OPS Well Pad Z;Ak, Ops West Area TL;AK, RES GPB East Wells Opt
Engr;AK, RES GPB West Wells Opt Engr;AKOpsProdEOCTL; Frankenburg,Amy;
Wellman,Julie
Cc: Wallace, Chris D (DOA);AK, GWO Completions Well Integrity;AK,GWO DHD Well
Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, GWO Well
Integrity Well Information;AK, OPS FF Well Ops Comp Rep;AKIMS App User; Cismoski,
Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael;Janowski, Carrie;
Montgomery,Travis J; Munk, Corey; Obrigewitch, Beau;O'connor, Katherine; Romo,
Louis A; Sternicki, Oliver R;Tempel,Joshua;Worthington,Aras J
Subject: UNDER EVALUATION: Producer H-35A(PTD#2140450) inner annulus casing pressure
above NOL
All,
Producer H-35A(PTD#2140450)was reported to have inner annulus pressure above NOL on 02/26/18.The pressure
was 2,060 psi.The well recently passed a cold TIFL on 02/18/18 but has continued to repressurize since.The
repressurization indicates a failure of one or more well barriers.The well has been reclassified as UNDER EVALUATION
and is on the 28 day clock for diagnostics and repair.
Plan forward:
1. Operations—Bring well online
2. DHD—Perform warm TIFL and follow up monitors
3. Slickline—(contingent) set DGLVs
4. Fullbore—(contingent) perform MIT-IA
Please respond if in conflict. SCANEB co
Andrew Ogg
Well Integrity Engineer
BP Global Wells Organization-Alaska
Office:907-659-8110
1
STATE OF ALASKA •
()ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed
Abandon 0 Plug Perforations ® Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0
Suspend 0 Perforate ® Other Stimulate 0 Alter Casing 0 Change Approved Program 0
Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 5e7L 6/9p
2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 214-045
3. Address: P.O.Box 196612 Anchorage, Development lI Exploratory 0
AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-22600-01-00
7. Property Designation(Lease Number): ADL 028284 8. Well Name and Number: PBU H-35A
9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools:
PRUDHOE BAY,PRUDHOE OIL
11.Present Well Condition Summary: ,,,
Total Depth: measured 11386 feet Plugs measured 10700,10900 feet
true vertical 8830 feet Junkmeasured None feet Effective Depth: measured 10700 feet Packer measured 8392 feet AUG 17 2017
true vertical 8894 feet Packer true vertical 8339 feet
AOGCC
Casing: Length: Size: MD: TVD: Burst: Collapse:
Structural
Conductor 80 20" 32-112 32-112 1490 470
Surface 3128 10-3/4" 31-3159 31-3131 5210 2480
Intermediate 8587 7-5/8" 29-8617 29-8564 8180 5120
Liner 290 5-1/2" 8432-8722 8379-8668 7740 6280
Liner 2988 3-1/4"x 2-7/8" 8398-11386 8345-8830
Perforation Depth: Measured depth: 10440-11060 feet
True vertical depth: 8893-8883 feet
Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 27-8438 27-8385
Packers and SSSV(type,measured and 4-1/2"Baker S-3 Perm Packer 8392 8339
true vertical depth)
12.Stimulation or cement squeeze summary:
Intervals treated(measured):
SCANNED NOV 0 7 2012
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: 372 26004 412 700 1075
Subsequent to operation: 641 7477 1767 1833 272
14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work:
Daily Report of Well Operations ® Exploratory 0 Development IZI Service 0 Stratigraphic 0
Copies of Logs and Surveys Run 0 16.Well Status after work: Oil H Gas 0 WDSPL 0
Printed and Electronic Fracture Stimulation Data ❑ GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0
17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt:
N/A
Authorized Name: Frankenburg,Amy Contact Name: Shriver,Tyson
Authorized Title: Non-Operated Resource Lead Contact Email: Tyson.Shriver@bp.com
Authorized Signature:a, Q Date: ' '( ?...,1
(+.Contact Phone: +1 9075644133
Form 10-404 Revised 04/2017 It rL to G 6 1-7-- J Submit Original Only
,4 COM l(7 RBDMS `. v AUG 2 3 2017
•
Daily Report of Well Operations
H-35A
ACTIVITYDATE SUMMARY
CTU#8 - 1.50"CT. Job Scope: Log, CIBP,Adperf
RU Coil#8. Function test BOP's. Kill well. Drift to 10800ft. Log up from 10800ft to 8250ft,
flag pipe at 10650ft.
Bled down OA from 600psi to 60psi (all fluid)
Logged from 10,800' up to 8200'. Tied into BP PDCL Log updated July 2014
Set CIBP at 10700ft.ME/ 10699.55'Top of plug
7/19/2017 ***In Progress***
CTU#8 - 1.50" CT. Job Scope: Log, CIBP,Adperf
RIH w/HES 2"Millenium pert gun (6 spf-60 degree phasing/ 18.3" pen., ent hole .22").
Tie into CIBP at 10700' and perforate interval 10,470' - 10,500'. Pooh. Shots fired, recover
ball. MU & RIH with HES 2'x 30' pert gun#2, tie into CIBP at 10700' and perforate 10,440'-
10470'. Pooh. Shots fired, recover ball. Pooh. Freeze protect w/50/50 meoh to 2500'.
7/20/2017 RDMOL
TREE=
__ 4-1/16" , • H -3 5A SAFETY NOTES: WELL ANGLE>70 @ 9150'***
VLHEAD� Fly CHROME TBG&LNR*** MAX DOGLEG:330 @
ACTUATOR= BAKERC 11341'***
OKE.ELEV= 75.64 I
BF.as,/= 47.22'
KOP= 2209' 2227' —14-1/2"HES HXO SSSV NP,D=3.813"
Max Angle= 103'@ 11341' CI
Datum MD= 8939'
Datum ND= 8800'SS
GAS LFT MANDRELS
10-3/4"CSG,45.5#,L-80 BTRS,D=9.953' -I 3157' ST MD TVD DEV TYPE VLV LATCH FORT DATE
6 3376 3345 7 KBMG-M DOME BK 16 08/06/14
5 5291 5246 3 KBMG-M SO BK 20 08/06/14
4 6548 6501 4 KBMG-M *DMY BK 0 09/13/05
Minimum ID =2.313" @ 8416' 3 7419 7370 4 KBMG M DMY BK 0 10/26/95
2-7/8" X NIP IN LTP STINGER 2 8043 7991 4 KBMG-M DMY BK 0 10/26/95
1 8311 8259 4 KBMG-M *DMY BK 0 07/19/05
*STA#4=DMY VALVES HAVE EXTEM3B3 PACKING
' 8368' H4-1/2"HES X NP,D=3.813"
MI 8389' -17-5/8"x 4-1/2"BKR S-3 NKR,D=3.875"
8398' H4-1/2"BKR KB LTP w/PTSA STINGER,D=2.45"
=' =' 8402' -14-1/2"FES X NP,D=3.813"
8412' 3.70"DEPLOY SLV,ID=3.00"-DEPTH
CORRECTION PER CALM(02/17/15)
TOP OF 3-1/4'X 2-7/8"LNR H 8412'
0,, 1111
8416' --I2-7/8"X NP,D=2.313'(INTEGRAL TO LTP STING)
3-112"LNR,9.2#,L-80 STL,.0087 bpf,ID=2.992" -1 8420' r8420' -j 3-1/2"X 3-3/16" XO,D=2.786'
; 41?
i, 8423' H4-1/2"HES XN IMP,MLLE()TO 3.80"(06/0414)
TOP OF 5-1/2"LNMR --1 8432' I 1
j 11.
8432' H7-5/8"x 5-1/2"BKR 2XP PKR w/6'EXT,D=5,5"
4-1/2"TBG,12.6#,13CR-80 NSCT, 8434' PI 'I.10. 8435' -14-1/2"WLEG,D=3.958" BEHIND
.0152 bpf,D=3.958" 9l V 1
;I V 8418' H ELM)TT LOGGE)11/08/95 CT LNR
`1 •4f 8444' --I7-5/8"x 5-1/2"BKR HMC HGR,ID=4.892"
�� ►moi
7-5/8"CSG,29.7#,NT-95 NSCC,D=6.875" -1 $616' }- •1 !fi
,NAI V
VI Vli
tom+ •Ill
%I %�1 & LOUT WINDOW (H-35A) 8722'-8734'
4-1/2"X 5-1/2"WI- STOCK(05/29/14) 8720' Oji 8966' 3 114'SHORT JONTw!RA TAG
L J-� J
w/RA TAG @ 8729' ;I '!a
V '4 * [ 9604' I-3-1/4"X 2-7/8"XO,D=2.377" ,1
5-12"LNR,17#,13CR 80 NSCC, -8720 .11.4". Nis,
*�� •�. 10001' 2-718"SHORT PUP
.0232 bpf,D=4892" - - -h�`0 �!�`` JOINT w/RA TAG
-t _ •d' .
5-12"POSISET PLUG(05/29/14) -- 8800' I ♦. �'
'�.�. �•�����: 10700'CTM -12-7/8"WFO
-4.%_,,• CBP(7/19/17)
PERFORATION SUMMARY a`�,'`
RE=LOG:GRI OCU RFM 07/26/14
3-1/4"LNR 6.6#,L-80 TC11, 9604' �izN �.
ANGLE AT TOP PERF:89'@ 10440' .0079 bpf,D=2.85" „Vali...
,.�
Note:Refer Production DB for historical pert data 2-7/8'WFD CEP(10/10/15) -I 10900' ' ��.,�..",
SIZE SPF NPBTD -I 11350'
TBRVAL Opn/Sgz SHOT SQZ "'4P..
2" 6 10440-10470 0 07/20/17
2" 6 10470-10500 0 07/20/17 2-7/8"LNR, 6.5#,L-80 STL,.0058 bpf,D=2-441" H 11386'
2" 6 10800-10850 C 07/28/14
2" 6 11010-11060 C 07/28/14
DATE REV BY COMMENTS DATE REV BY COMIVENfS FRIAHOE BAY UNIT
10/25/95 N2E5 IMTIAL COMPLETION 03/03/15 STF/,Mu) SET LTPw/STINGER& X NP(2/17-18/15) WELL: H-35A
07/28/14 NORDIC CTD SIDETRACK(H-35A) 11/05/15 ALMJMO SET CIBP(10/1C/15) PHRMT No:12140450
08/01/14 PJC DRLG DRAFT CORRECTIONS 07/24/17 M5S/JMJ SET CIBP&ADPERFS API Nb: 50-029-22600-01
08/04/14 TF/PJC FNAK ODEAPPROVAL SEC 21,T11N,R13E,745'FNL&1266'FE-
0822/14,IvIV/JMD GLV GO(08/06/14)
01/20/15 DGS/JM)TBG CORRECTION BP Exploration(Alaska)
STATE OF ALASKA
•ALASKA OIL AND GAS CONSERVATION COMMI N
* REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed
Abandon ❑ Plug Perforations ® Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0
Suspend ❑ Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0
Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: ,SG f el8' "
2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 214-045
3. Address: P.O.Box 196612 Anchorage, Development El Exploratory 0
AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-22600-01-00
7. Property Designation(Lease Number): ADL 0028284 8. Well Name and Number: PBU H-35A
9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools:
PRUDHOE BAY,PRUDHOE OIL
11.Present Well Condition Summary:
Total Depth: measured 11386 feet Plugs measured 10900 feet !RECEIVED
true vertical 8830 feet Junk measured feet 0
Effective Depth: measured 10900 feet Packer measured See Attachment feet N O V 6 2015
true vertical_ 8897 feet Packer true vertical See Attachment feet
AO CC
Casing: Length: Size: MD: TVD: Burst: Collapse:
Structural
Conductor 78 20"91.5#H-40 31-109 31-109 1490 470
Surface 3128 10-3/4"45.5#L-80 30-3158 30-3130 5210 2480
Intermediate 8587 7-5/8"29.7#NT-95 29-8617 29-8564 8180 5120
Production
Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment
Perforation Depth: Measured depth: 10800 10850 feet 11010-11060 feet
True vertical depth: 8898-8898 feet 8888-8883 feet
SCANNED JAN 2 9 2016
Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr8 26-8437 26-8384
Packers and SSSV(type,measured and See Attachment See Attachment See Attachment
true vertical depth)
12.Stimulation or cement squeeze summary:
Intervals treated(measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: 652 37814 419 767 1002
Subsequent to operation: Shut-In 1020
14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work:
Daily Report of Well Operations I3 Exploratory 0 Development Q Service 0 Stratigraphic 0
Copies of Logs and Surveys Run 0 16.Well Status after work: Oil IZ1 Gas 0 WDSPL 0
Printed and Electronic Fracture Stimulation Data 0 GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0
17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt:
N/A
Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com
Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer
Signature ), (1, €--- Phone +1 907 564 4424 Date 11/6/15
vn— /-2-/-7-/ c5 �v
Form 10-404 Revised 5/2015 / ��� RBDMS INV 10 2015 Submit Original Only
• •
Packers and SSV's Attachment
PBU H-35A
SW Name Type MD TVD Depscription
H-35A TBG PACKER 8389 8336.4 4-1/2" Baker S-3 Perm Packer
H-35A TBG PACKER 8389.99 8337.39 4-1/2" Baker S-3 Perm Packer
H-35A PACKER 8438.92 8386.19 5-1/2" BAKER ZXP PACKER
• •
m
.o D o O o 0
R co N N CO O
CO N Ln
0 N Ln CO I�
U
y 0 0 0 O O O O
Cr) CO N
N
U') co co f� O co
O O V co N CO CD "4-
CO CO CO CO CO CO CO
O N— Ln CO CA C) O CO
CO CO CO CO CO CO CO
H
CO CO O N
O O V (.fl CO CO O
M M N M M M O) N
CO CO CO CO
C
a) OO r` O V N
O Ln N O N co co
CO CO
CO CO 0 0 CO CO
p
(a
Q
Q L OMcr
(+r) O CA O N co O CO
co co N V V (.0 N
_ = O O CO Cr)
Cn o
F— a Oo o Co
0000 0Oo
co
coin Z 4# 1#
NL*jln *ka0 � *k `nc(0
• r O
U O M N N N
N O M N r
�- lnM Ln 4
t
+-' co N- O N
D co N O O co co
C N CO N- 'yr
J M CO N r CO
W
C
C F
W
' W
U
U co 0 CC CC CC c Z
Z W W W W W m
Q DF- _Z Z_ Z_ Z_ D
U CA Z J J J J H
0 0
•
_1
U \
U• DG
CU b CV ƒ
&
Eo \ $
/• 21 _0
aE@ ,
0, 0_ 7
\ 2 §
>< 'Cr)
/ % ( ƒ
\ / % _
2 o E /
= a
■C 7 § ) ° /
E / e ? E
co 2 2a-\ / % E
CL 2 E - \ / \ H
2 � � � �� � / -
Q \ f \ E _ 3
2 36b / b
0. \o %/ $ƒ% 0o /
£ \ 99 /
cm c d
COCe \\ / /
t c e @ CO 0 CL =
CV (3) / \ 5 H
2 / / ? ƒ f 2 g a) ° a \
_ $ s
to N. E F/ a_ ) / w 2 \ C / /
D e e 3 0)\ G 0 0- o $
\ 0_ o f O / 2 \ a / / / f
= 2 ._ ,.CD = % / 7 �
\ & f ƒ 5 i O E E s t 2 ƒ
2
< r r
<
/ (N ( / \ /
3 6 I � ,-
A / \
O
<
TREE= 4-1/16'(NV%Ma11-EAD= FAC 0 H -3 -Y 5A S NOTES: WELL ANGLE>70 @ 9150' --
**•
CME TBG&LNR*** MAX DOGLEG:33°
ACTUATCA= BAKER C
11341 "'
I
tiKB.13_EV= 75.64 I
BF.ELB/= 47.22' _
KOP= 2209' 222T —14-1/2"HES WO SSSV NP,ID=3.813'
Max Angle= 103 @11341' 0
Datum MD= 8939'
Datum TVD= 8800'SS
GAS LFT MANDRELS
10-3/4'CSG,45.5#,L-80 BTRS,ID=9.953' --1 310T k
ST MD TVD DEV TYPE VLV LATCH PORT DATE 1
6 3376 3345 7 KBMG-M DONE BK 16 08/06/14
5 5291 5246 3 KBMG-M SO BK 20 08/06/14
4 6548 6501 4 KBM3-M "GUY BK 0 09/13/05
Minimum ID =2.313" @ 8416' 3 7419 7370 4 KBMG-M [NY BK 0 10/26/95
2 8043 7991 4 KBM3-M OW BK 0 10/26/95
2-7/8" X NIP IN LTP STINGER 1 8311 8259 4 KBNE,-M *DMY BK 0 07/19/05
•STA N4=DMY VALVES HAVE EXTENDED PACKING
8368' —14-1/2"HES X MP,ID=3.813"
M 11„......._-4..- 8389' H7-5/8"x 4-1/7 BKR 5-3 PKR,I).3.875'
8398' —14-1/2'BKR KB LTP w/PISA S71\IGER,I)=2.45'
8402' —14-1/7 HES X NP,13=3.813"
! ! 8412' —3.70"DEPLOY SLV,ID=3.00"-DEPTH
CORRECTION PER CALIFER(02/17/15)
TOP OF 3-1/4"X 2-7/8'LNIR H 8412'
; g 8416' J-2-7/B"X.--NP,D=2313"(NTEGRAL TO LIP STN ]
3-1/2"LNR,9.2#,L-80 STL,.0087 bpf,D=2,992" --I 8420' 8420' —3-1/2'X 3-3/16' X0..ID=2.786"
1 0 — _
8423' —14-1/2"FES XN MP,MLLBD TO 3.80'(06/0414)
TOP OF 5-1/2"LNR H 8432" bi
0 1 ------ 8437 H7-5/8"x 5-1/2"BKR ZXP PKR w/6'EXT,E)=5,5'
4-1/2'TBG,12.6#,130R-80 NSCT, 8434' .•
Alw. ',"-- 843S 1/7 IM_EG,ID=3. 1
BEHIND
$
P i '.:t.. MUM--1H 4-ELK)TT LOGGED 11/08/95 CT LNR
:. ...._.......„___
8444' —17-5/8"x 5-1/2'BKR I-MC FIGR ID=4 892"
P $
7-5/8'CSG,29.7#,NT-95 NSCC,ID=6.875" — %iv }-4 $.4 k
_
-to MLLOLIT WNDOW (H-35A) 8722'-8734'
4 lib.
4-1/7 X 5-1/7 W-IFSTOCK(05/29/14) 8720'
1 4''
WI RA TAG(4 8729' %1 • 8966' —13-1/4"SHORT PUP JOINT w/RA TAG
"No.31. '1141ri 4,c.„4 b."
5-1/2"LNR 17#,13CR-80 NSCC, "8720 9604' —13-114"X 2-7/8"XO,ID=2.377'
.0232 bpf,I)=4.892" .....,,....__
5-1/7 POSISET PLUG(05/29/14) — 6800' MilrE 4.1. .,_#*‘,0 10001' 12.7/8"SHORT PUP
1q19 INk....
JOWT w/RA TAG
PERFORATION SUMVARY 4444-„qt, Nii..44k
REF LOG:GRI CCU RPM 07/26/14 3-1/4"LW,6.6#,L-80 TCI 1, 9604' 'Illtw fit
ANGLE AT TOP P .0079 bpf,D=2.85'
ERF:88° ., 10800' A7.04.1,44.
Wife:Refer to Production DB for historical perf data 2-7/8'WFD CEP(10/10/15) 10900'
SIZE SPF INTERVAL Opn/Sqz SHOT SQZ PBTD H 11360'
2" 6 10800- 10850 0 07/28/14
2" 6 11010- 11060 C 07/28/14 2-7/8'LNR, 6,5#,L-80 STL,.0058 bpf,ID=2,441" H 11386'
DATE REV BY COMMENTS - DATE REV BY COMM:NTS FRUDHOE BAY UNIT
10/25/95 N2E5 INITIAL COMPLETION 03/03/15 SIF/JM) SET LTPw/STNGFIR& MVP(2/17-18/15) IA'El...L H-35A
07/28/14 NORDIC CM SIDETRACK(H-35A) 11/05/15 ALIKIND SET( P(10/10/15) FERMI'No:12140450
08/01/14 PJC DREG CRAFT CORRECTIONS AR No: 50-029-22600-01
08/04/14 TH/PJC RNAK 00E AFFROVAL SEC 21,T11N,R13E,745'FM_&1266'Fa
08/22/14 144,NJMD GLV GO(08/06/14)
01/20/15 DGS/JMY113G CORRECTION 13P Exploration(Alaska)
• STATE OF ALASKA
t •SKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1 Operations Abandon H Repair Well U Plug Perforations H Perforate H Other U Set LTP
Performed Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extension❑
Change Approved Program ❑ Operat.Shutdowns Stimulate-Other ❑ Re-enter Suspended Well❑
2 Operator 4 Well Class Before Work: 5 Permit to Drill Number
Name BP Exploration(Alaska),Inc
Developments Exploratory ❑ 214-045-0
3 Address P 0 Box 196612 Stratigraphic❑ Service ❑ 6.API Number
Anchorage,AK 99519-6612 50-029-22600-01-00
7 Property Designation(Lease Number) 8 Well Name and Number
ADL0028284 PBU H-35A
9 Logs(List logs and submit electronic and printed data per 20AAC25 071). 10 Field/Pool(s)
PRUDHOE BAY,PRUDHOE OIL
11 Present Well Condition Summary
Total Depth measured 11386 feet Plugs measured None RECEIVED
true vertical 8829 B3 feet Junk measured None feet
MAR 2 3 2015
Effective Depth measured 11350 feet Packer measured See Attachment feet
true vertical 8837 87 feet true vertical None feet yj/J(3CC
Casing Length Size MD TVD Burst Collapse
Structural None None None None None None
Conductor 81 20"91 5#H-40 29-110 29-110 1490 470
Surface See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment
Intermediate None None None None None None
Production 8588 7-5/8"29 7#NT-95HS 28-8616 28-8562 76 8180 5120
Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment
Perforation depth Measured depth 10800-10850 feet 11010-11060 feet
True Vertical depth 8897 58-8898 44 feet 8888 42-8882 97 feet
Tubing(size,grade,measured and true vertical depth) 4-1/2"12 6#13Cr80 25-8435 25-8382 28
Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer
None None None SSSV
12 Stimulation or cement squeeze summary
Intervals treated(measured) r SCANNED
1 Treatment descriptions including volumes used and final pressure: A. &�
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 659 32346 90 0 1505
Sybsequent to operation 933 42577 121 0 1142
14 Attachments 15 Well Class after work
Copies of Logs and Surveys Run Explorator,❑ Development Q Service❑ Stratigraphic ❑
Daily Report of Well Operations X 16 Well Status after work Oil U Gas U WDSPLIJ
GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG❑
17 I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C 0 Exempt
N/A
Contact Nita Summerhays Email Nita.Summerhays[a�bp.com
Printed Name Nita ummerhaysn Title Petrotechnical Data Engineer
Signatur- 7ii�� ����.— e Phone 564-4035 Date 3/23/2015
„/I/, '//moi --� . .--- -
1TL- ¢l / //5- RBDM APR - 3 2015
/It `�/7/--
Form 10-404 Revised 10/2012 Submit Original Only
Daily Report of Well Operations
ADL0028284
AQ ITY TF EKY
_,..,-.. ,.._..._._. .k.v ,.: .., . w .....::�a,�.�.ae�;....w...,c.,,6a',..< .�.... ..c _�...�"c`�..,:....,;6� ._.
2/14/2015 Cost Place Holder. Machine X-over and no go sub for Weglinator for LTP.
2/17/2015 Fluid support
***WELL FLOWING ON ARRIVAL****(Profile Mod)
RAN 2.75"CENT, 2,50"S. BAILER, TO 8850'SLM (no recovery)
RAN 2.25"CENT, PDS 24 CALIPER, MADE TWO PASSES OVER DEPLOYMENT SLV AT
50'/MIN AND 60/MIN FROM 8,500 SLM TO 8,200'SLM
2/1712015 ***CONTINUE ON 2015***
***CONTINUE FROM 2/17/2015*** (profile modification)
LRS LOAD TBG W/ 180 BBLS OF CRUDE
BRUSH TBG TO DEPLOYMENT SLV AT 8388' SLM
DRIFT TO DEPLOYMENT SLV W/PTSU DRIFT AT 8384' SLM
SET PTSA STINGER IN DEPLOYMENT SLV AT 8384' SLM
SET BAKER 45 KB PACKER W/6' PUP JOINT AND QCLLAT 8,385' SLM
SET 2-7/8"XX-PLUG IN X-NIPPLE IN LTP AT 8,387' SLM (lih =23', 4 x 1/2" ports)
2/18/2015 ***CONTINUE ON 2/19/2015***
T/I/O=2460/462/0 TEMP= SI Assist Slickline, Loaded TBG with 5 bbls Meth Spear followed
by 180bbIs Crude. Pumped 27 bbls of crude assisting Sline to set Liner. Pumped 3 bbls
2/18/2015 pressuring up on TBG for MITxT ***Job cont to 2-19-15 WSR***
***CONTINUE FROM 2/18/2015*** (profile modification)
LRS PERFORMED PASSING MIT-T TO 2000psi
PULL 2-7/8" PLUG BODY FROM X-NIPPLE IN LTP AT 8,387' SLM
2/19/2015 ***JOB COMPLETE, PAD OP NOTIFIED, WELL SHUT IN ON DEPARTURE***
***Job cont. r 2-18-15 WSR*** ( MITxT 2000 psi) Pumped 4 bbls of 60*crude down TBG to
obtain a 2000 psi MITxT . 1st 15min TBG lost 43 psi / 2nd 15 min TBG lost 20 psi . Total
loss was 63 psi for a passing test.. Bleed TBG down to 500 psi per Sline WSL. SLine in control
of well upon LRS departure. DSO notified of well Status. MIT cation tags hung on MV CV's
2/19/2015 =OTG FWHP's= 500/456/0
FLUIDS PUMPED
BBLS
I DIESEL
4 METH
220 CRUDE
225 TOTAL
0)
• 0 0 0m 0 00 00 O 0 0 0
m O. m a0 N
a0 N t Ln
C O Lf) N N N-
0
y 0 0 0 0 0 0 0 0
- 0) - N t Lo0 a0 = — M
m c- O— m O— co Lf) Lf) m
N LC) I— M O N K co
M (O M (0 N- N- N- N
= I� 00 0) N 00 c0 N
(0 a0 M N (0 N N 00
M O (0 00 Ln = M
co 00 a0 a0 a0 M M co
H
M M N M
co O (0 co
N N N N
M M M M
M c0 M (
C —
c- aO m 00 00 M M ao
C.)
CO d' DI ,
N
Co rnocv ((ioaommm
N N V d- (0 N N N N
1- 9U0 CD
00 c0 LLU (0oo °O
v oo CO COJ (�
C Ji J M Jt
CL)Cn NinN (0 L% •
Z LU LL()
•C 1-•• * 1010
O CO r" (fl V "4" N
U O N V N -a\0 N
L() L0 r
+-' V O N a0 a0 00 O
C)I- 0) c0 aO M N N
' O
C aO LU V
N NN- e0 M M ao
J
Z
O O
• H- I- ww
CO D : Q Q O
UOWIYCYfY0LLLLZ
Zw Ww W 000
O ZJDD
O J J J J Q- Cn CJ) H
Packers and SSV's Attachment
ADL0028284
SW Name Type MD TVD Depscription
H-35A PACKER 8389 8336.4 4-1/2" Baker S-3 Perm Packer
H-35A PACKER 8432 8379.29 5-1/2" BAKER ZXP PACKER
TR .EE T1 = • 4-1/16"aVV
WELLFEAD= FAC H -3 5A SAFETY NOTES: WELL ANGLE>70 @ 91 50'***
CHROME TBG& LNR ** MAX DOGLEG:3 3*@
ACTUATOR= BAKER C
1 1 341'•••
0103. ELEV= - 75.64 :i
KOP= — 2209I
BF.ELEV= 4722'
{ 2227' —4-1/2"HES FiX0 SSSV NP,O=3.813"
'
Max Angle= 103°@ 11341'
Datum M3= 8939'
[ tum*6= 8800SS
GAS LFT MANDRELS
10-3/4"CSG,45.5#,L-80 BTRS,ID=9.953" — 3157' ST MD TVD DEV TYPE VLV LATCH PORT DATE
6 3376 3345 7 KBMG-M COME BK 16 08/06/14
5 5291 5246 3 KBMG-M SO BK 20 08/06/14
L 4 6548 6501 4 KBMG-M *DMY BK 0 09/13/05
3 7419 7370 4 KBMS-M DMY BK 0 10/26/95
Minimum ID = 2.313" @ 8416'
2 8043 7991 4 KBMG-M DMY BK 0 10/26/95
2-7/8" X NIP IN LTP STINGER 1 8311 8259 4 KI3MG-M "[MY BK 0 07/19/05
`STA#4=MAY VALVES HAVE ENDED PACKING
I 8368' —4-1/2"FES X IsW,ID=3.813"
>< 8389' H7-518'x 4-1/2"BKR S-3 PKR,()=3.875"
-1 4-1/2'BKR KB LW w/PTSA STINGER,ID=2.45'
.g
8402' —4-1/2-HES X NP,ID=3.813"
8412' —3.70-DEPLOY SLV,ID=3 00"-DEPTH
CORRECTION FER CA LFER(02/17/15)
TOP OF 3-1/4"X 2-7/8"LNR — 8412' 1 -
%i 8416' —I2-7/8-X NP,ID=2.313"(I'JTEGRAL TO LW STIs1G)
I 1.
3-1/2"LNR,9.2#,L-80 STL, .0087 bpf,ID=2.992" —1--8420' i \ ; A 8420' —3-1/2'X 3-3/16" XO,ID=2.786"
TOP OF 5-1/2"LNR H 8432' 4 .. 8423' —4-1/2"HES XN NIP,MLLE")TO 3.80'(06/0414) i
I I. .• 8437 H7-5/8"x 5-1/2"BKR ZXP PKR w/6'EXT,ID=5,5' 1
4-1/2"TBG, 12.64t, 13CR-80 NSCT, — 8434' to :;.,M 8435' —4-1/2"WLEG,ID=3.956' BEHIND
.0152 bpf,D=3.958" 1:10 •4-1
,
1,.. .: CT LNR
•
1 P 41A••• 8418' H ELMD TT LOGGED 11/08/95
1 rior ,..
.--,- 8444' —7-5/8-x 5-1/2"BKR HMC HGR,ID=4.892" 1
V El•.4 _
kj '9-4
7-5/8"CSG,29.7#,NT-95 NSCC,ID=6.875" — 8616' 1—A F•ie 47:4
V .1,..
• •••
bp 4,A
•4' MLLOUT WINDOW (H-35A) 8722'-8734'
4-1/2"X 5-1/2"W-IFSTOCK(05/29/14) —1 8720' V k,
lk ;,:k.,
WI RA TAG @ 8729' i8966' —13-1/4"SHORT RIP JONI w/RA TAG
•..
5-1/2"LNR,17#,13CR-80 NSCC, — —8720 -4. 9604' H 3-1/4"X 2-7/8"X0,D=2.377'
.0232 bpf,ID=4.892'
5-1/2"FOSISET FL UG(05/29/14) — 8800' ..a-wwiINF, Ai.',0,
10001' 12.7/8"SHORT FVP
._—
W
Alliew. .. * , JOINT w/RA TAG AWA -....... .ir...-
.Nramit#47:--., .44.,
PERFORATION SUMARY
REF LOG:GR/OM RPM 07/26/14
3-1/4"LW,6.6#,L-80 TC11, —1 9604'
ANGLE AT TOP FURF:88°@ 10800'
.0079 bpf,ID=2.85" 4411..Not AI ,..kr..Ne.
Note:Refer to Production 013 for histoncal perf data Alp iikii-:-
SEE SPF INTERVAL Opn/Sqz SHOT , SCIZ FM-B---TD 1-1 11350'
2- 6 10800-10850 0 07/28/14
2" 6 11010-11060 0 07/28/14 2-7/8"LNR, 6 5#,L-80 SIL,.0058 bpf,ID=2.441" H 11386'
DATE REV BY COMkiENTS DATE REV BY COMENTS ] PRUDHOE BAY UNfT
10/25/95 N2E5 INITIAL COM PLET1ON 03/03/15 STE/J11/4() SET LTPw/STNGER& X NIP(2/17-18/15) WELL: H-35A
07/28/14.NORDIC i CTD SIDETRACK(1435A) PERMIT ND.'2140450
08/01/14 PJC DRLG DRAFT CORRECTIONS ARI'b' 50-029-22600-01
08/04/14 TI-VPJC FlNAK ODE APPROVAL SEC 21,T11N, R13E, 745'FM_&1266'FE_
08/22/14 JMMcJACIGLV 00(08/06/14)
01/20/15.DGS/JAC TBG CORRECTION ' BP Exploration(Alaska)k a)