Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout214-052Operator Name:2.
Development Exploratory
Service
5
Permit to Drill Number:214-052
6.50-029-20153-04-00
PRUDHOE BAY, PRUDHOE OIL
Hilcorp North Slope, LLC 5.
Well Name and Number:8.
10.Field/Pools:
Well Class Before Work4.
Present Well Condition Summary:11.
Total Depth: measured feet
feet
Plugs measured feet
feet
Effective Depth: measured feet
feet
Packer measured feet
feettrue vertical true vertical
12914
12871
8889
8805
None
None
8133
Casing: Length: Size: MD: TVD: Burst: Collapse:
Conductor 80 20" 25 - 105 25 - 105 1530 520
Surface 2705 13-3/8" 25 - 2730 25 - 2730 5380 2670
Intermediate 4621 9-5/8" 23 - 4644 23 - 4476 6870 4760
Liner 6017 7" 3013 - 9030 3012 - 8336 7240 5410
Liner 1491 4-1/2" 8876 - 10367 8197 - 8906 8430 7500
Perforation Depth: Measured depth: 10795 - 12850
feet
True vertical depth:8911 - 8890 feet
Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# 13Cr80 21 - 8882 21 - 8202
8805 8133Packers and SSSV (type, measured and
true vertical depth)
4-1/2" Baker S-3 Perm Packer
Liner 3255 3-1/2x3-1/4x2-7/8 9652 - 12907 8841 - 8886 10160 / 10571 10530 / 11160
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
7402536230
3216203 900
19352
442 753
Representative Daily Average Production or Injection Data
Prior to well operation:
Subsequent to operation:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Name:
Contact Email:
Dave Bjork
david.bjork@hilcorp.com
Authorized Name:Bo York
Authorized Title:
Authorized Signature with Date:Contact Phone:(907)440-0331
Treatment descriptions including volumes used and final pressure:
13.
Sr Operations Manager
Operations Performed1.
Abandon Plug Perforations Fracture Stimulate Pull Tubing
GSTOR WINJ WAG GINJ SUSP SPLUG
16. Well Status after work:Oil 5 Gas
Exploratory Development 5 Stratigraphic
15. Well Class after work:
Service
WDSPL
14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283)
Daily Report of Well Operations
Copies of Logs and Surveys Run
true vertical measured8886
Sundry Number or N/A if C.O. Exempt:
321-087
Junk
Packer
Printed and Electronic Fracture Stimulation Data
5
CTU Extended
Perforating
Operations shutdown
Change Approved Program
5
Senior Pet Engineer:Senior Res. Engineer:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Suspend 5Perforate Other Stimulate Alter Casing
Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well
3.Address: 3800 Centerpoint Dr, Suite
1400, Anchorage, AK 99503
7.Property Designation (Lease Number):ADL 0028308 PBU 02-09D
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
Stratigraphic
Other:
API Number:
Form 10-404 Revised 03/2020 Submit Within 30 days of Operations
By Samantha Carlisle at 12:55 pm, Jun 23, 2021
Digitally signed by Bo York
DN: cn=Bo York, c=US, o=HIlcorp
Alaska LLC, ou=Alaska North
Slope, email=byork@hilcorp.com
Date: 2021.06.23 12:18:52 -08'00'
Bo York
SFD 6/23/2021MGR30JUL2021
100
DSR-6/24/21
100
SFD 6/23/2021
RBDMS HEW 6/24/2021
ACTIVITYDATE SUMMARY
6/3/2021
CTU #9, 1.75" CT, Job Objective: Extended Addperf.
MIRU CTU. Weekly BOP test. Make up 2.2" GR/CCL carrier and 2.25" DJN and RIH.
Kill well with Slick 1% KCl w/ SafeLube and log from 11,300' up to 10,000', painting a
blue tie-in flag at 10,800. POOH keeping hole filled and begin openhole operations.
Confirm -1.5' correction. Make up Perf gun BHA with 190' of 2" Maxforce perf guns, 6
spf. Perforate 10,795' - 10,885' and 10,930' - 10,985'. Keep hole full while POOH.
Undeploy spent gun. Begin RD.
...In Progress...
6/4/2021
CTU #9, 1.75" CT, Job Objective: Extended Addperf.
RDMO.
***Complete. Well shut in on departure.*** CP
Daily Report of Well Operations
PBU 02-09D
Operator Name:2.
Exploratory Development
Service
5
Permit to Drill Number:214-052
6.API Number:50-029-20153-04-00
PRUDHOE BAY, PRUDHOE OIL
Hilcorp North Slope, LLC 5.
Field/Pools:9.
Well Name and Number:
ADL 028308
Property Designation (Lease Number):10.
8.
PBU 02-09d
7.If perforating:
What Regulation or Conservation Order governs well spacing in this pool?
Will planned perforations require a spacing exception?
Stratigraphic
Current Well Class:4.
Type of Request:1.Abandon Plug Perforations Fracture Stimulate Repair Well
Operations shutdown
Op Shutdown
GAS
GSTOR WAG
SPLUG
Abandoned
Oil 5 WINJ
Exploratory Development 5Stratigraphic Service
WDSPL
12. Attachments:
PRESENT WELL CONDITION SUMMARY
12914
Effective Depth MD:
13Cr80
11.
3/1/2021
Commission Representative:
15.
Suspended
Contact Name: Dave Bjork
Contact Email: David.Bjork@hilcorp.com
Authorized Name: Bo York
Authorized Title:Operations Manager
Authorized Signature:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other:
Yes No Spacing Exception Required?Subsequent Form Required:
Approved by:COMMISSIONER
APPROVED BYTHE
COMMISSION Date:
5OtherAlter Casing
Pull Tubing
Conditions of approval: Notify Commission so that a representative may witness Sundry Number:
COMMISSION USE ONLY
17. I hereby certify that the foregoing is true and the procedure approved herein will not
be deviated from without prior written approval.
Detailed Operations Program
Packers and SSSV Type:
No SSSV Installed
Packers and SSSV MD (ft) and TVD (ft):
Perforation Depth MD (ft):Tubing Size:
Size
Total Depth MD (ft):Total Depth TVD(ft):
8886
Effective Depth TVD:Plugs (MD):Junk (MD):
Other Stimulate
Re-enter Susp Well
Suspend
Plug for Redrill
55Perforate
Perforate New Pool
8805, 8133
No SSSV Installed
Date:
Liner 3255 3-1/2"x3-1/4"x2-7/8"9652 - 12907 8841 - 8886 10160 / 10571 10530 / 11160
Well Status after proposed work:
16. Verbal Approval:
Change Approved Program
25 - 105
23 - 4644 23 - 4476
14. Estimated Date for Commencing Operations:
BOP Sketch
25 - 2730
Conductor
7240
Proposal Summary 13. Well Class after proposed work:
4-1/2" Baker S-3 Perm Packer
11132 - 12850 8912 - 8890 4-1/2" 12.6# 13Cr80 21 - 8882
Liner
12871 8889 none none
25 - 2730 2670
9-5/8"
7"
Contact Phone:(907) 440 - 0331
Date:2-17-21
5410
2705 538013-3/8"Surface
4760
GINJ
5
Post Initial Injection MIT Req'd? Yes No
5
Comm.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
80 20"25 - 105 520
Intermediate 4621 6870
Liner 6017 3013 - 9030 3012 - 8336
1491 4-1/2" 8876 - 10367 8197 - 8906 8430 7500
Address:3800 Centerpoint Dr, Suite 1400,
Anchorage, AK 99503
3.
No 5Yes
Casing Length MD TVD Burst
1530
Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft):
Collapse
MPSP (psi):
Wellbore Schematic
2470
Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng
Form 10-403 Revised 03/2020 Approved application is valid for 12 months from the date of approval.
CTU extended perforating
By Samantha Carlisle at 3:51 pm, Feb 17, 2021
321-087
Digitally signed by Bo York
DN: cn=Bo York, c=US, o=HIlcorp
Alaska LLC, ou=Alaska North
Slope, email=byork@hilcorp.com
Date: 2021.02.17 14:56:28 -09'00'
Bo York
10-404
MGR18FEB2021 DSR-2/17/21
2470
SFD 2/17/2021
Yes Required?
C
2/18/21
dts 2/18/2021 JLC 2/18/2021
RBDMS HEW 2/25/2021
Add Perf Procedure
02-09d
PTD: 2140520
Well Name: 02-09d Add Perf API Number: 50-029-20153-04
Current Status: Flowing Rig: CTU
Estimated Start Date: 03/1/2021 Estimated Duration: 2 days
Regulatory Contact: Carrie Janowski Permit to Drill Number: 2140520
First Call Engineer: David Bjork (907) 440-0331 (c)
Second Call Engineer:
AFE Number: IOR 60
Current Bottom Hole Pressure: 3327 psi @ 8,800’ TVD 7.3 PPGE | SBHPS taken as analog
from offset 02-32.
Maximum Expected BHP: 3350 psi @ 8,800’ TVD 7.4 PPGE | Average Ivishak BHP)
Max. Anticipated Surface Pressure: 2470psi (Based on 0.1 psi/ft. gas gradient)
Last SI WHP: 2150 psi (Taken on 12/26/2019 DHD)
Min ID: 2.37” ID – FLowgard LTP @ 9,652’MD
Max Angle: 94 Deg @ 12,848’
Reference Log: Baker RPM - Log Dated 09-Jun-2014
Brief Well Summary:
02-09d is a CST completed in Z1A in June 2014. Add perfs were added in 2019 to increase ontime and a more
favorable GOR.
Objective:
The objective of this procedure is to shoot heel perfs from 10,795-10,885 and 10,930-10,985 that were
designated as a future opportunity during the initial completion to get more footage open in Z1A and increase
production. This will add rate and provide more uniform drawdown along the lateral.
Sundry Procedure (Approval Required to Proceed):
Note: The well will be killed and monitored before making up the initial perfs guns. This will provide guidance as
to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is
seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up
through the same port that opened to shear the firing head.
Coil Tubing
1. MIRU Coiled Tubing Unit and spot ancillary equipment.
2. Bullhead 165 bbls of KWF, 8.4 ppg 1% KCl or 8.5 ppg down the tubing to the formation. (This step can
be performed any time prior to open-hole deployment of the perf guns. Timing of the well kill is at the
discretion of the WSS.)
a. Wellbore volume to top perf = 165 bbls
b. 4-1/2” Tubing - 9652’ X .0152bpf = 147 bbls
c. 3-1/2” Liner - 60’ X .0087bpf = 0.5 bbls
d. 3-1/4” Liner - 1157’ x .0079 = 9 bbls
e. 2-7/8” Liner – 1420’ X .0058bpf = 8 bbls
3. MU and RIH with logging tools and drift BHA to resemble 2” dmy gun. Run past 11100’ctmd and log
OOH.
4. POOH and confirm good data.
*
shoot heel perfs from 10,795-10,885 and 10,930-10,985 t
Add Perf Procedure
02-09d
PTD: 2140520
5. Freeze protect tubing as needed.
6. At surface, prepare for deployment of TCP guns.
7. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/ KWF, 8.4 ppg 1% KCl or 8.5 ppg
as needed. Maintain continuous hole fill taking returns to tank until lubricator connection is
reestablished.
8. Pickup safety joint and TIW valve and space out before MU guns. Review well control steps with crew
prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety
joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the
working platform for quick deployment if necessary.
9. Break lubricator connection at QTS and begin makeup of TCP guns and blanks per schedule below.
02-09d Addperf Schedule
*HES 2” guns were used to estimate for this job. If unavailable, use another vendor as needed.
Perf Interval Perf Interval Perf
Length
Gun
Length
Weight
of Gun
(lbs)
10795-10885 10930-10985 145 190 1064lbs
(5.6ppf)
10. RIH with perf gun and tie-in to coil flag correlation. Pickup and perforate interval per Perf Schedule
above. POOH.
a. Note any tubing pressure change in WSR.
11. POOH. Stop at surface to reconfirm well dead and hole full.
12. Review well control steps with crew prior to breaking lubricator connection and commencing breakdown
of TCP gun string.
13. RDMO CTU.
14. RTP or FP well.
Attachments:
1. Current Wellbore Schematic
2. Proposed Schematic
3. Coil Tubing BOPE Schematic
4. Equipment Layout Diagram
5. Standing Orders for Open Hole Well Control during Perf Gun Deployment
6. Mini Log
7. Tie In Log/Perf Sheet
*See note above regarding kill methods if pressure
observed on surface after perforating.
Assure excess fluids available if needed to keep hole full.
Standing orders flow chart included with this sundry request.
Add Perf Procedure
02-09d
PTD: 2140520
Current Wellbore Schematic
Add Perf Procedure
02-09d
PTD: 2140520
Proposed Schematic
Add Perf Procedure
02-09d
PTD: 2140520
Coiled Tubing BOPs
Add Perf Procedure
02-09d
PTD: 2140520
Equipment Layout Diagram
Add Perf Procedure
02-09d
PTD: 2140520
Standing Orders for Open Hole Well Control during Perf Gun Deployment
Add Perf Procedure
02-09d
PTD: 2140520
11-11A Mini Log
PE Notes
Producer
Add Perf Procedure
02-09d
PTD: 2140520
11-11A Tie-In Log
Add Perf Procedure
02-09d
PTD: 2140520
Add Perf Procedure
02-09d
PTD: 2140520
Add Perf Procedure
02-09d
PTD: 2140520
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
RECEIVE®
JAN 0 8 2020
1. Operations Performed
AOGCC
Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑
Pull Tubing ❑ Operations shutdown
❑
Suspend ❑ Perforate Ef Other Stimulate ❑
Alter Casing ❑ Change Approved Program
❑
Plug for Rednll ❑ Perforate New Pool ❑ Repair Well ❑
Re-enter Susp Well ❑ Other:
❑
2. Operator Name: BP Exploration (Alaska), Inc
4. Well Class Before Work
Development 0
Exploratory E]AK
5. Permit to Drlll Number: 214-052
3. Address: P.O. Box 196612 Anchorage,
99519-6612
Stratigraphic ❑
Service ❑
6. API Number: 50-029-20153-04-00
7 Property Designation (Lease Number): ADL 028308
S.
Well Name and Number: PBU 02-09D
9. Logs (List logs and submit electronic and printed data per 20AAC25.071).
10.
Field/Pools:
PRUDHOE BAY, PRUDHOE OIL
11. Present Well Condition Summary:
Total Depth: measured 12914 feet Plugs
measured None feet
true vertical 8886 feet Junk
measured None feet
Effective Depth: measured 12871 feet Packer
measured 8805 feet
true vertical 8889 feet Packer true
vertical 8133 feet
Casing: Length: Size: MD:
TVD: Burst: Collapse:
Conductor 80 20" 25-105
25-105 1530 520
Surface 2705 13-3/8" 25-2730
25-2730 5380 2670
Intermediate 4621 9-5/8" 23-4644
23-4476 6870 4760
Liner 5017 7" 3013-9030
3012-8336 7240 5410
Liner 1491 4-1/2" 8876-10367
8197-8906 8430 7500
Liner 3255 3-1/2" x 3-1/4" x 2-7/8" 9652-12907
8841 -8886 10160 / 10570 10530/11160
Perforation Depth: Measured depth: 11132 -12850 feet
True vertical depth: 8912 - 8890 feet
Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr80
21-8882 21-8202
Packers and SSSV (type, measured and 4-1/2" Baker S-3 Perm Packer
8805 8133
true vertical depth)
No SSSV Installed
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil -Bbl
Gas-Mcf
Water -Bbl
Casing Pressure
Tubing Pressure
Prior to well operation:
215
21022
6
0
813
Subsequent to operation:
166
13400
8
0
795
14.Attachments: (required per 20 nnc 25,070.25.071. s 25.283)
15. Well Class after work:
Daily Report of Well Operations 1771
Exploratory ❑ Development
p Service ❑ Stratigraphic ❑
Copies of Logs and Surveys Run ❑
16. Well Status after work:
Oil 0 Gas ❑ WDSPL ❑
Printed and Electronic Fracture Stimulation Data ❑
GSTOR ❑ WINJ ❑
WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Sundry Number or N/A if C.O. Exempt:
WA
Authorized Name: Oestgaard, Finn
Contact Name: Oestgaard, Finn
Authorized Title: Produ on Engineer Challen er
Contact Email: Fino.Oestgaard(Mbp.com
Authorized Signature: Date: I' t�' Z-OiA Contact Phone: +1 907 564 5026
Form 10-404 Revised 04/2017 �A%l,/�L� t"�LsK—�T,�JI'Y/�-5� ABDMS_[9J JAN 10 2020 Submit Original Only
Daily Report of Well Operations
PBU 02-09D
ACTIVITVnATF QI meenn Dv
***WELL S/I ON ARRIVAL***(perforating)
DRIFT TO 9,815' SLM W/ 11' x 2.00" PJO DUMMY GUN (max od 2.29")
7/7/2019
***WELL S/I ON DEPARTURE***
CTU #8 1.75" coil 0.156WT
Objective: Perforate
MIRU. Begin BOP test.
12/8/2019
***Job Continued on 12/9/19 WSR***
CTU #8 1.75" coil 0.156WT
Objective: Perforate
Finish partial BOP test. Finish rigging up. MU & RIH w/ HES GR/CCL memory logging tools. Tag in
middle of perfs at 12,619', have overpulls while POOH. Log from 11,800'- 9,600'. Download data
and have +1' correction. Standby for wind.
12/9/2019
***Job Continued on 12/10/19 WSR***
CTU #8 1.75" coil 0.156WT
Objective: Perforate
Stand by for wind, resume after weather changed from phase 2 to phase 1. MU and RIH with SLB
2" PJ Omega gun #1. Perforate 11539'- 11570'. POOH. Confirm shots fired, ball recovered. MU &
RIH w/ SLB 2" PJ Omega gun #2. Perforate 11508' - 11539'. POOH.
12/10/2019
***Job Continued on 12/11/19 WSR***
CTU #8 1.75" coil 0.156WT
Objective: Perforate
Finish POOH with gun #2. Confirm shots fired, ball recovered. Trim 100' pipe, change packoffs. MU
& RIH w/ gun #3. Perforate 11476'- 11508'. Shots fired and ball recovered. MU and RIH with HES
memorycoil flag. Log from 11,600'- 9,600'. Paint a yellow flag at 11200. POOH. Confirm good
data, (4' correction, correlated to Baker RPM log Pass 1 dated 09 -JUN -2014.) MU & RIH w/ gun #4.
Perforate 11446- 11476'. POOH.
12/11/2019
***Job Continued on 12/12/19 WSR***
CTU #8 1.75" coil 0.156WT
Objective: Perforate
Finish POOH w/ gun #4. Confirm shots fired, ball recovered. MU & RIH w/ gun #5. Perforate 11,267'
-11,287'. shots fired and ball recovered. Trim pipe change packoffs. MU and RIH with HES
memorycoil flag. Log from 11,300 - 9,600. Paint ORANGE flag at 11,100'. POOH. Makeup pert
gun run #5 with 31'x 2.0" PowerJet Omega perf guns, 6 spf, and RIH. Tie-in at Orange and get on
depth to perforate 11163-11194'.
12/12/2019
...Continued on WSR 12-13-19....
CTU #8 - 1.75" Coil, 0.156 wt. ***Continued from WSR 12-12-19***
Job Objective: Add Perf
Perforate 11163-11194' with 2.0" PowerJet Omega perf guns, 6 spf, POOH. All shots fired and ball
recovered. Make up Perf gun run #7 with 31'x 2.0" PowerJet Omega perf guns, 6 spf, RIH.
Perforate 11,132' - 11,163'. POOH. All shots fired and ball recovered. Freeze protect tubing with
6 /40.
12/13/2019
..*Complete***
TREE = 4-1/16"CIW
WELLFEAD= FMC,
BF. ELEV = 60.43'
KOP= 4597'20^ CppD(Xq 7
Max Angle = 94' Q 1284F 94#, F440,
Datum MD= 9681' D=19.124'
Datum TVD= 88001SS
9-5/8" CSG, 47#, L-80 HYDRL 563, D=8.681" 2026'
13-3/8" CSG, 72#, MN -80, D = 12.347" yj 273W
9-5/8" X 7" BKR ZXP LTP 3013"
w /9.6' TEBK, D = 6.30"
19-5/8"X 7' BKR FLE( LOCK HGR, D = 6.33" 3029'
W1-PSTOCK (11/27107)4644'
9-5/8" CSG, 47 #,N-80,D=8.681-I—F 4644
Minimum ID = 2.370'@ 9652'
45 FLOGARD LNR TOP PKR
02 0 9 0 SAFETY NOTES: WELL ANGLE> DO L 9741 G:24 .
� •`• 4-1/2" CHROME TBG •`» MAX DOGLEG; 24.7" �
12790'. WELL HAS HAD HISTORICAL CELLAR
BUBBLING.
4-1/2" HES X NP, I0=3.813"
9-5/8" FOC w / CMT BELOW TO 2300'
GAS LFT MANDRELS
ST
MD
TVD
DEV
TYPE
VLV
I LATCH
I FORT
DATE
4
2838
2838
2
KBG2-1R
DDME
BK
16
07115/14
3
5251
4994
27
KBG2-1R
DONE
BK
16
09/10/14
2
7078
6606
26
KBG2-1R
DW
BK
0
12114/07
1
8654
8000
27
KBG2-1R
DMY
BK
0
12114/07
8-112" MLLOUT WINDOW (02.09C) 4644' - 4681-
14-1 r2-
681'
14-12" HES X NP, D = 3.813"
412" TBG, 12.6#, 13CR-80 VAM TOP, 8882'
.0152 bpf, D = 3.958"
7' LNIZ 26#, L-80 TCl lA TGM, 9030'
REF LOG: BKR RPM ON 06/01/14
ANGLE ATTOP PERF: 89'@ 11132'
8806' --{ 7" X 4-12" BKR S-3 PKR D =8.875"
8839' 4-12' HES X NP, D = 3.813"
8869' 412" HES XN NP, NEED TO 3.80" (04/
8876' 7" X 5" HR ZXP LTP, D = 4.410"
8882' 4-1/2" WLCfi, D = 3.958"
8898' 7 X 5" FLEXLOCK LNR HGR, D = 4.430"
8908' 5" X 4-1/2" XO, D = 3.958"
.0383 bpf, D = 6276"
CMT — 9656
192'9712'
1/14) 10367'
L-80
PERFORATION SUMMARY
REF LOG: BKR RPM ON 06/01/14
ANGLE ATTOP PERF: 89'@ 11132'
Note: Refer to PmducBon DB for NstDdcal pertdata
SIZE
SPF
INTERVAL
OprJSqz
SHOT
SQZ
2"
6
11132-11194
O
12/13/19
0811997
2"
6
11267-11287
O
12/12/19
SIDETRACK(02-09C)
2"
6
11446 - 11570
O
12111/19
2"
6
11870 -12180
O
06/11/14
2"
6
12250 -12370
O
06/11/14
2"
6
12420-12480
O
06/11/14
2"
6
12530-12850
O
06/11/14
31/4^ LNR, 6.6#, L-80 TCI, .0079 bpf, D = 2.850^ 1--� 1
J 9652' —I45
FLOGARD LTP, D= 2.37" (06/11114)
9658'
3.70" DEPLOY SLEEVE, D= 3.00"
9680'
3-12" OTIS X NP, D = 2.813"
9712'
3-12" X 3-3116" XO, D = 2.786"
4-1/2" MILLOUT WINDOW (02-09D) 10367'-10376- I
10869' 3-3/16^ X 2-7/8' XO, D = 2.377"
DATE
REV BY
COMMENTS
DATE I REV BY COMMENTS
08102176
PKR 141 ORIG64AL COMPLETION
07107/14 CRR/JMD ADDED SAFETY NOTE
12/11180
N1ES
RWO
07/16/14 CJN/JMD GLVC/0(07/15/14)
0611296
N35
CM (02-09A)
09/15/14 DLH/JMD GLVC/O(09/10/14)
0811997
N4135
CM (024913)
12/18/19 BG/JMD GLVC/O
1211497
N2E5
SIDETRACK(02-09C)
06/12114
NORDIC 1
CTO SIDETRACK (02-090)
PRUDHOE BAY UNrr
WELL: 02-09D
PERMrr No: 2140520
API No: 50-029-20153-04
SEC 36, T11 N, R14E, 1216' FNL &971
BP Exploration (Alaska)