Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
214-055
7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU H-19C Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 214-055 50-029-20883-03-00 13116 Conductor Surface Intermediate Liner Liner 8760 80 2619 3199 6641 3628 12289 20" x 30" 13-3/8" 9-5/8" 7" 4-1/2" 8739 45 - 125 44 - 2663 40 - 3239 3072 - 9713 9486 - 13114 45 - 125 44 - 2663 40 - 3237 3071 - 8675 8486 - 8760 None 2670 4760 5410 7500 12289 5380 6870 7240 8430 9903 - 13112 4-1/2" 12.6# 13cr85 36 - 9490 8811 - 8760 Structural 4-1/2" HES TNT Perm Packer 9355 8375 Torin Roschinger Operations Manager Aras Worthington aras.worthington@hilcorp.com 907-564-4763 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028284 36 - 8490 N/A N/A 55 698 24 2153 384 2238 967 1200 167 200 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV Installed 9355, 8375 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 2:57 pm, Aug 23, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2024.08.23 14:21:15 - 08'00' Torin Roschinger (4662) RBDMS JSB 082924 DSR-8/26/24WCB 10-3-2024 ACTIVITY DATE SUMMARY 4/11/2024 T/I/O= 217/1440/82. LRS 76 Assist Slickline (PERFORATING). Pumped 176 bbls of crude into the TBG. Final T/I/O= 906/1480/116. 4/11/2024 ***WELL S/I ON ARRIVAL*** (Perforating) LATCH CUTTER BAR AT 9,840' SLM (Lose spangs & oj's) LRS PUMPED 31BBLS CRUDE AT 5BPM (Tools free) LRS LOADED TBG w/ 100BBLS CRUDE & 10BBLS DIESEL RAN 4 1/2" BLB,3.50" CENTRALIZER,3.25" LIB TO 9,750' SLM(Unable to work deeper) RAN 10'x2 1/2" PUMP BAILER TO FISH AT 9,850' SLM(Empty) RAN 4 1/2" BLB & 2.75" LIB TO 9,780' SLM(Unable to work deeper) ***CONTINUED ON 4/12/24 WSR*** 4/12/2024 ***CONTINUED FROM 4/11/24 WSR*** (Perforating) RAN 3.25" LIB TO TOP OF FISH AT 9,850' SLM (Impression of clean ropesocket) JARRED DOWN ON FISH FOR 15MIN WITH 3.5" BLIND BOX TO SHEAR GS LATCH FISH w/ R TOOL(Gs not sheared) SHEARED DOGLESS JD ON FISH JARRED ON STUCK TOOLSTRING(4 hours) CONDUCTED LOSS OF WELL CONTROL DRILL w/ WSL ***CONTINUED ON 4/13/24 WSR*** 4/13/2024 ***CONTINUED FROM 4/12/24 WSR*** (Perforating) JARRED ON TOOLSTRING AT 9,850' SLM (9 1/2 hours total) JARRED DOWN ON TOOLSTRING WITH 3.5" BLIND BOX FOR 1 HOUR ***CONTINUED ON 4/14/24 WSR*** 4/14/2024 ***CONTINUED FROM 4/13/24 WSR*** (Perforating) PUMPED FULL DIESEL TOTE DOWN HOLE w/ TRIPLEX. JARRED ON TOOLSTRING FOR 51MIN(Blew out jd skirt) JARRED DOWN WITH BOTH TOOLSTRINGS FOR 10 MIN UNABLE TO RE-LATCH TOOLSTRING PLANT BAITED 3-1/2" WFD HD OVERSHOT ON FISH AT 9850' SLM JARRED ON OVERSHOT FOR 1HOUR ATTEMPTED TO SET 4 1/2" IBP STOP(Unable to work through x nip @ 9,326' md) RAN 4 1/2" BLB,3.80" GAUGE RING TO 9,326' MD(Unable to work through) ***CONTINUED ON 4/15/24 WSR*** 4/15/2024 ***CONTINUED FROM 4/14/24 WSR***(Perforating) RAN 4 1/2" BLB, 3.75" GAUGE RING TO 9,306' SLM (Unable to work deeper) SET 4 1/2" IBP STOP AT 2,019' MD RAN 4 1/2" CHECK SET TO 2,019' MD(Sheared) ***WELL S/I ON DEPARTURE, NOTIFY DSO OF WELL STATUS*** 4/19/2024 ***WELL S/I ON ARRIVAL*** (perforating) PULLED 4-1/2" IBP STOP @ 2019' SLM JARRED ON FISH @ 9840' SLM FOR 1 HOUR 20 MIN (no movement) ***JOB SUSPENDED, WELL LEFT S/I, DSO NOTIFIED*** 4/22/2024 ***WELL S/I ON ARRIVAL*** JAR ON TOOL STRING @ 9,840 BLM ***CONTINUE TO 4/23/24 Daily Report of Well Operations PBU H-19C Daily Report of Well Operations PBU H-19C 4/23/2024 ***CONTINUE FROM 4/22/24*** RECOVER SLICKLINE TOOL STRING @ 9840' BLM RECOVER FISH NECK OF WRP @ 9,876' BLM ***WELL LEFT S/I*** 5/19/2024 ***WELL S/I ON ARRIVAL*** TAGGED WRP w/ 2.85" LIB @ 9853' SLM. (impression of shear stud). RAN 4-1/2" GR, 4-1/2" BAIT SUB, AND 3.13" NON RELEASABLE OVERSHOT. UNABLE TO WORK PAST 9842' SLM. P/U WEIGHTS 1200-1300#. RAN 4-1/2" BRUSH, 3.70" GAUGE RING TO 9838' SLM. CHUNKS OF SOFT RUBBER IN BRUSH. RAN 3" PUMP BAILER TO 9853' SLM. NO SOLIDS. RAN 3.70" CENT, 3' x 1.875" STEM, AND 3.65" SWAGE TO 9853' SLM. RAN 4-1/2" GR, 4-1/2" BAIT SUB, AND 3.13" NON RELEASABLE OVERSHOT. UNABLE TO WORK PAST 9838' SLM. ***WSR CONTINUED ON 5-20-24*** 5/20/2024 ***WSR CONTINUED FROM 5-19-24*** RAN KJ, 4-1/2" GR, 4-1/2" BAIT SUB, AND 3.13" OVERSHOT. UNABLE TO WORK PAST 9838' SLM. RAN 3 1/2" GR, 3 1/2" BAIT SUB, AND 3.13" OVERSHOT TO 9853' SLM. Marks on skirt from WRP collet indicate was over core, but grapple too deep to engage. RAN 3-1/2" GR, BAITED 2.82" BOWEN OVERSHOT TO 9,853' SLM, Marks appear to be from top edge of 2" od, RAN KJ, 3-1/2" GR, BAITED 2.82" BOWEN OVERSHOT TO 9,853' SLM, Marks on skirt from WRP collet RAN 2-1/2" SAMPLE BAILER w/ WRP EQ BTM w/ TATTLE TALE PINS, RESULTS INCONCLUSIVE. ***WELL S/I ON DEPARTURE*** 5/24/2024 ***WELL S/I ON ARRIVAL*** RAN 4-1/2" GR, 4-1/2" BAIT SUB 3.65" OVERSHOT w/ 2" GRAPPLE (oal = 28", max od = 3.65") S/D @ 9,853' SLM (SLIPPING OFF) RAN 4-1/2" GR, 4-1/2" BAIT SUB, XO, 3.50" O.D. WEATHERFORD RELEASABLE OVERSHOT (1.875" - 2.0" grapples) S/D @ 9,854' SLM (SLIPPING OFF) ***CONTINUE 5/25/24*** Daily Report of Well Operations PBU H-19C 5/25/2024 ***CONTINUE FROM 5/24/24*** RAN 4-1/2" GR, 4-1/2" BAIT SUB, 3.50" WFD RELEASABLE OVER SHOT(1.875" - 2.0" grapple) S/D @ 9,854' SLM RAN 3-1/2" GR, 3-1/2" BAIT SUB, 2.50" WFD RELEASABLE OVER SHOT (43' OAL)(1.75"-2.03" grapple) S/D @ 9,856' SLM (unable to latch fish) RAN 3.25" BARBELL w/ 2.85" LIB, IMPRESSION OF WRP SHEAR STUD RAN 3.62" BELL GUIDE w/ TATTLE TALE PINS (ring from eq sleeve on inside bevel of bell guide, tattle tale pins only worked to ~5-1/2" indicating core is further down in wrp with possibly only the threaded part of core extended from collets) RAN WFD WRP PULLING TOOL w/ TATTLE TALE PINS & COLLET REMOVED (jarred down 30 mins, tattle tale pins same as bell guide) RAN 3-1/2" GR, 3-1/2" BAITSUB, 3.64" WFD RELEASABLE OVERSHOT (1.625" - 1.75" grapple) S/D @ 9,855' SLM (JAR FOR 1 HR / 1600#) ***CONTINUE 5/26/24*** 5/26/2024 ***CONTINUE FROM 5/25/24*** MADE 2 RUNS w/ 3-1/2" GR (brass pin) S/D @ 9,850' SLM, JAR DOWN 2 HRS TOTAL (unable to release wfd overshot) ***WELL S/I ON DEPARTURE*** **3-1/2" BAITED WFD RELEASABLE OVERSHOT LEFT ON WRP FISH @ 9,855' SLM, OAL = 50", GRAPPLE SIZE 1.625' - 1.75", ENGAGED ON THREADED SECTION OF WRP CORE*** 6/29/2024 ***WELL S/I ON ARRIVAL**** R/U HES 759 BRAIDED LINE ***CONT WSR ON 6/30/24*** 6/30/2024 ***CONT WSR FROM 06/29/2024*** JAR ON 4-1/2" WRP @ 9,855' SLM W/ BRAIDED LINE FOR 5.5 HRS ***CONT WSR ON 07/01/2024*** 7/1/2024 ***CONT WSR FROM 06/30/2024*** JAR ON 4-1/2" WRP @ 9,855' SLM FOR 3 HRS (8.5 hrs total) ***WELL LEFT S/I ON DEPARTURE. DSO NOTIFIED OF STATUS*** *****3-1/2" BAITED WFD OVERSHOT SIH. COME BACK WHEN CRANE AVAILABLE***** 8/5/2024 LRS CTU 2, 2.0" .156" HT-95. Job Scope: Fish WRP MIRU CTU, Function test BOPs, Make up BOT fishing tools. RIH and tag fish at 9853' CTMD. Jar on fish at max pull holding max pull for 5 min after each jar hit. 50 jar hits & pump off fish. POOH circ well @ 80%. ***Continue on WSR 8/6/24*** Daily Report of Well Operations PBU H-19C 8/6/2024 LRS CTU 2, 2.0" .156" HT-95. Job Scope: Fish WRP POOH Circ @ 80%, BD BOT Fishing BHA. Cut 125' 2" CT. Make up BOT fishing tools. RIH and tag fish at 9853' CTMD. Attempt to jar on fish but jars fired while PUH. Pump off fish and changed jars. Loaded well with crude while RIH and noticed an sudden increase in injectivity. RIH and tagged fish ~100' deeper than previous runs. Latched fish pulled with slight overpulls up to 9,850'. RBIH and worked fish up and down until it pulled clean. POOH and recovered WRP. ***Job Complete*** 8/8/2024 ***WELL S/I ON ARRIVAL*** R/U SLICKLINE. ***CONTINUED ON 8-9-24*** 8/9/2024 ***WSR CONTINUED FROM 8-8-24*** RAN 4 1/2" BRUSH, AND 3 PRONGED WIRE GRAB TO 9830' SLM. NO RUBBER RECOVERY. RAN 10' x 2.5" PUMP BAILER TO DEVIATION @ 10,058' SLM. 1/2 CUP OF SCALE IN BAILER. RAN 20' x 2 7/8" DUMY GUNS (3.16" RINGS). STALL TO DEVIATION @ 9998' SLM. ***WELL S/I ON DEPARTURE*** 8/10/2024 ***WELL S/I ON ARRIVAL*** RAN 4-1/2" BLB, 3.59" GAUGE RING TO 10,102' SLM (while pumping) RAN 20' x 2-7/8" DUMMY RUNS(w/3.16" rings) TO 10,090' SLM (while pumping) ****WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED OF STATUS*** 8/10/2024 T/I/O = 100/250/25 Temp=S/I (Assist Slickline Pump Down) Pumped 86 bbls Crude down TBG to assist with Pump Down Pollard SL in control of well upon TFS departure FWHPS = 50/250/25 8/14/2024 T/I/O = 52/250/0 Temp=S/I (Assist E-Line with Perforating) Pumped 47 bbls Crude down TBG to assist with pump down. Yellowjacket E-Line in control of well upon TFS departure FWHPS = 50/255/0 8/14/2024 *** WELL SI ON ARRIVAL *** (ELINE ADPERF) CONNECT AND FUNCTION WLV, PT 300/3000 PSI RIH W/ 2-3/4" 18 FT 6 SPF PERF GUN, PUMP DOWN CENTRALIZER, GR/CCL. SET DOWN AT 10022 FT, UNABLE TO REACH TARGET OF 10069 FT. POOH AND SDFN. TRACTOR DISPATCHED FOR TOMORROW. *** WELL SI ON DEPARTURE, JOB IN PROGRESS *** 8/15/2024 *** CONTINUED FROM 08/14/2024 *** (ELINE ADPERF) RU YJ ELINE FUNCTION WLV, PT 300 LOW, 3000 PSI HIGH, GOOD. RIH ALTUS 2.5" TRACTOR, CCL,GR, 18 FT, 6SPF, 60 DEG, GEO RAZOR PERF GUN. CORRELATE TO SLB VISION 16 MAY 2014 TRACTOR FROM 9990 TO 10120 FT, PERFORATE 10069-10087 FT, CCL OFFSET = 7.2, CCL STOP 10061.8 FT. ALL SHOTS FIRED. SDFN *** JOB CONTINUED 8/16/24 *** 8/16/2024 Assist E-line with pump down, Initial WHP T/IA/OA= 50/225/5 Pumped 22 bbls Crude down TBG for pump down Final WHP T/IA/OA= 50/225/5 PERFORATE 10069-10087 FT Daily Report of Well Operations PBU H-19C 8/16/2024 *** CONTINUED FROM 08/15/2024 *** (ELINE ADPERF) RU YJ ELINE, FUNCTION WLV, PT 300/3000 PSI. CORRELATED TO: SLB VISION SERVICE 16 MAY 2014 2-3/4", 6 SPF, 60 DEG PHASE, GEO RAZOR CHARGES TRACTORED GUNS 2 AND 3 FROM 9970 FT TO 10100 FT. GUN 4 WAS PUMPED DOWN AT 5 BPM. INTERVAL 10035-10055' OFFSET 3.0', CCL STOP 10032.0' ALL SHOTS FIRED. INTERVAL 10010-10025' OFFSET 6.2', CCL STOP 10003.8' ALL SHOTS FIRED. INTERVAL 9989-10002' OFFSET 6.9', CCL STOP 9982.1' ALL SHOTS FIRED. ELINE COMPLETE. *** WELL SI ON DEPARTURE *** INTERVAL 9989-10002' OFFSET INTERVAL 10035-10055' INTERVAL 10010-10025' Adperfs are shown correctly on WBS below. -WCB 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU H-19C Pull WRP Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 214-055 50-029-20883-03-00 13116 Conductor Surface Intermediate Liner Liner 8760 80 2619 3199 6641 3521 9890 20" x 30" 13-3/8" 9-5/8" 7" 4-1/2" 8803 45 - 125 44 - 2663 40 - 3239 3072 - 9713 9535 - 13114 45 - 125 44 - 2663 40 - 3237 3071 - 8675 8527 - 8760 9847, 9855, 9890 2670 4760 5410 7500 12289 5380 6870 7240 8430 9903 - 13112 4-1/2" 12.6# 13cr85 36 - 9490 8811 - 8760 Structural 4-1/2" HES TNT Perm Packer 9355, 8375 9355 8375 Torin Roschinger Operations Manager Aras Worthington aras.worthington@hilcorp.com 907-564-4763 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028284 36 - 8490 N/A N/A 55 Well Not Online 24 384 967 1500 167 1040 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 3:44 pm, Mar 04, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2024.03.01 14:07:00 -09'00' Torin Roschinger (4662) RBDMS JSB 031324 DSR-3/4/24WCB 2024-06-25 ACTIVITY DATE SUMMARY 2/13/2024 ***WELL FLOWING ON ARRIVAL*** RAN 3' P-BAILER w/WRP EQ SLEEVE(3.70"), S/D ON XN-NIP @ 9460'MD, UNABLE TO WORK PAST RAN 4-1/2'' BLB & 3'' SAMPLE BAILER, BRUSH XN-NIP @ 9460'MD, TAG 9888'SLM RAN 10' x 3" PUMP BAILER (msbb) TO 9897' SLM HAVE WELL CONTROL DRILL W/ WSL RAN 10' x 3" DD BAILER (msfb) TO 9898' SLM ***CONT WSR ON 02-14-2024*** 2/13/2024 TFS Unit 4 (Freeze Protect) TBG and Flowline. Pumped 3 BBLS of Neat and 35 BBLS of DSL down the TBG to FP to 2500ft. Pumped 9 BBLS of Neat and 27 BBLS of DSL to FP the Flowline. Pressured FL to 1500 psi per Pad Op. Slick Line in control of well upon departure Flags and tags hung. FWHP= 1925/1900/275 2/14/2024 ***CONT WSR FROM 02-13-2024*** MADE MULTIPLE RUNS w/ 12' x 3" PUMP BAILER (msfb) FROM 9898' SLM TO 9920'SLM ***WELL LEFT S/I ON DEPARTURE*** JOB NOT COMPLETE 2/16/2024 ***WELL S/I ON ARRIVAL*** RAN (3x) KJ 14' x 3'' P-BAILER (MSFB) FROM 9918' SLM, WORK TO 9936' SLM (recovered ~9gal sand) ***WSR CONT ON 2-17-24*** 2/17/2024 ***WSR CONT FROM 2-16-24*** RAN (5x) KJ, 14' x 3'' P-BAILER FROM 9941'SLM TO 9963'SLM ( Recovered 10 gal sand) RAN KJ, 14' x 3'' P-BAILER w/WRP EQ SLEEVE, S/D ON XN-NIP @ 9444'SLM/9460'MD RAN KJ, 4-1/2'' BLB, 3.63'' G-RING, BRUSHED XN @ 9460'MD & UNABLE TO WORK PAST 9850'SLM RAN KJ, 5'x1-7/8'', 3.25'' G-RING, DRIFT FREELY TO 9958'SLM RAN KJ, 5'x1-7/8'', 3.38'' G-RING, DRIFT FREELY TO 9960'SLM RAN KJ, 5'x1-7/8'', 3.50'' G-RING, DRIFT FREELY TO 9962'SLM RAN KJ, 5'x1-7/8'', 3.63'' G-RING, S/D 9525' SLM, TAP THRU & CLEAN UP AREA, CONT RIH & S/D @ 9962' SLM RAN KJ. 4-1/2'' BLB, 3.70'' G-RING, BRUSH XN-NIP @ 9460'MD, WORK FROM 9474' SLM TO 9860' SLM RAN KJ.4-1/2'' BLB, 3.67'' G-RING, S/D @ 9844' SLM, TAP THRU TO 9862' SLM ***WSR CONT ON 2-18-24*** Daily Report of Well Operations PBU H-19C Daily Report of Well Operations PBU H-19C 2/18/2024 ***WSR CONT FROM 2-17-24*** RAN KJ, 5'x1-7/8'', 3.65'' G-RING, DRIFT CLEANLY TO 9962' SLM RAN KJ, 5'x1-7/8'', 3.67'' G-RING, DRIFT CLEANLY TO 9962 SLM RAN KJ, 5'x1-7/8'', 3.70'' G-RING, DRIFT CLEANLY TO 9868'SLM, ATTEMPED TO WORK PASSED, JAR UP HEAVY OVER A HOUR, PUMP TRUCK ASSIST TO GET FREE RAN KJ, 5'x1-7/8'', 4-1/2'' BLB, 3.67'' G-RING, WORK TIGHT SPOTS FOR 25MIN FROM ~9820' SLM TO ~9860' SLM W/ T-BIRD PUMPING (see log) RAN RIH w/ KJ, 14' x 3'' P-BAILER (msfb) (cont on next day) ***WSR CONT ON 2-19-24*** 2/18/2024 T/I/O= 1000/1500/50 (Assist Slickline) TFS U3. Pumped 4 bbls of 60/40 followed by 345 bbls of crude to load and assist slickline as directed *Job continues to 2-19-24* 2/19/2024 ***WSR CONT FROM 2-18-24*** RAN KJ, 14' x 3'' P-BAILER (msfb) S/D @ 9961' SLM (recovered ~2gal mug & scale) RAN KJ, 5'x1-7/8'', 3.70'' G-RING CLEAN UP AREA @ ~9967' SLM, T-BIRD PUMP ASSIST (total of 22bbls crude) TAG WRP @ 9961' SLM/ 9979' MD RAN KJ, 14' x 3'' P-BAILER (msfb) S/D @ 9961' SLM (recovered 1/2 gal fine sand) RAN KJ, 14'x3'' P-BAILER w/ 3.68'' WRP EQ SLEEVE w/ TT-PINS, S/D @ 9816'SLM, WORK TOOLS TO 9940'SLM (no recovery) RAN KJ, 8'x3'' P-BAILER w/ 3.68'' EQ SLEEVE w/TT PINS TO WRP @ 9958'SLM/ 9979' MD (no recovery, tt pins sheared, metal marks on btm) RAN 4-1/2'' GR, 3.66'' WRP EQ/PULLING TOOL w/o GRAPPELS w/TT PINS TO WRP @ 9963'SLM/9979'MD (no pressure change) RAN KJ, 8'x3'' P-BAILER w/ 3.68'' EQ SLEEVE w/TT PINS TO WRP @ 9965'SLM/ 9979' MD (no recovery, pins sheared) RAN 4-1/2'' GR, 3.66'' WRP EQ/PULLING TOOL w/o GRAPPELS w/TT PINS TO WRP @ 9963'SLM/ 9979' MD, JAR DOWN AGGRESSIVELY FOR 1HR (lower tt-pin bent) RAN 4-1/2'' GR, 3.66'' WRP EQ/PULLING TOOL w/ GRAPPELS AND LATCH UP TO WRP 9965' SLM/ 9979' MD, JAR HEAVY FOR 1HOUR, WORK TO 9927' SLM RAN 4-1/2'' GS (5/16''brass) (cont on next day) ***WSR CONT ON 2-20-24*** 2/19/2024 *Job continues from 2-18-24* (Assist Slickline) TFS U3. Pumped 22 bbls of crude down the TBG to assist slickline as needed. Well left in control of slickline upon departure 2/20/2024 ***WSR CONT FROM 2-19-24*** JARRED ON WRP FOR 3hrs MOVED WRP UP TO 9890'SLM/9906'MD **R/D FOR WEATHER** ***WELL LEFT S/I / JOB INCOMPLETE*** 2/23/2024 T/I/O= 50/1455/75 Assist Slickline (PERFORATING) Pumped 3 bbls ofcrude down tbg to try and free stuck toolstring. Decison made they were dropping a cutter bar.Released from job site.. SL in control of well upon departure.FWHPs= 50/1450/75 ) RAN 4-1/2'' GR, 3.66'' WRP EQ/PULLING TOOL w/ GRAPPELS AND LATCH UP TO WRP 9965' SLM/ 9979' MD, JAR HEAVY FOR 1HOUR, WORK TO 9927' SLM JARRED ON WRP FOR 3hrs MOVED WRP UP TO 9890'SLM/9906'MD Daily Report of Well Operations PBU H-19C 2/23/2024 ***WELL S/I ON ARRIVAL*** RAN 3'' x 10' P.BAILER (msfb) TO 3.66'' WRP EQ/PULLING TOOL & 4-1/2'' WRP @ 9890' SLM(Trace amounts of scale) RAN 4-1/2" GR(3/8" brass) TO 3.66" WRP EQ/PULLING TOOL & 4-1/2" WRP @ 9.887' SLM, JAR DOWN FOR 20 MIN. (no movement) RAN 4-1/2" GS (5/16" brass) TO 3.66" WRP EQ/PULLING TOOL & 4-1/2" WRP @ 9,890' SLM, JAR HEAVY FOR 1 HOUR (no movement) DROP 1-3/4" R. SOCKET, 6' x 2-1/8" R. STEM w/ 2.60" wheels(ONLY 9 WHEELS, 5 on upper piece, 4 on lower), 1.875" GO DEVIL CUTTER(OAL=7' 7") TOOL STRING LEFT IN HOLE = 8' x 2-1/8" STEM, KJ 5' x 2-1/8" STEM, 1-3/4" OJ's, 1-7/8" KJ LSS (OAL = 29' 10"), 4-1/2" GS (OAL = 17") ***WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED OF WELL STATUS*** RAN 4-1/2" GS (5/16" brass) TO 3.66" WRP EQ/PULLING TOOL & 4-1/2" WRP @() 9,890' SLM, JAR HEAVY FOR 1 HOUR (no movement) () RAN 4-1/2" GR(3/8" brass) TO 3.66"WRP EQ/PULLING TOOL & 4-1/2" WRP @() 9.887' SLM, JAR DOWN FOR 20 MIN. (no movement)() The WRP is still in the hole, @~9890' SLM, with a SL tool string above it. -WCB STATE OF ALASKA OLASKA OIL AND GAS CONSERVATION COMMI REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations ® Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate ® Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well ❑ Re-enter Susp Well 0 Other:5df- GVR P 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 214-055 3. Address: P.O.Box 196612 Anchorage, Development ® Exploratory 0 AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-20883-03-00 7. Property Designation(Lease Number): ADL 028284 8. Well Name and Number. PBU H-19C 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY.PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 13116 feet Plugs measured 9979,12289 feet AUG 1 6 2017 true vertical 8760 feet Junk measured None feet Effective Depth: measured 9979 feet Packer measured 9358 feet true vertical 8847 feet Packer true vertical 8377 feet AOGCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"x 30" 45-125 45-125 Surface 2619 13-3/8" 44-2663 44-2663 4930 2670 Intermediate 3199 9-5/8" 40-3239 40-3237 6870 4760 Liner 6641 7" 3072-9713 3071-8675 7240 5410 Liner 3628 4-1/2" 9486-13114 8486-8760 8430 7500 Perforation Depth: Measured depth: 9903-13112 feet True vertical depth: 8811-8760 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr85 38-9493 38-8492 Packers and SSSV(type,measured and 4-1/2"HES TNT Perm Packer 9358 8377 true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: SCANNED NOV 0 7 2017 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 1920 1100 Subsequent to operation: 0 0 0 1820 860 14.Attachments:(required per 20 AAc 25.070.25 071,a 25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory 0 Development WE Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 11 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP ❑ SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Shriver,Tyson Contact Name: Shriver,Tyson Authorized Title: Well Intervention Engineer Contact Email: Tyson.Shriver@bp.com Authorized Signature: �� 1 Date: ,k//6/1? Contact Phone: +1 9075644133 Form 10-404 Revised 04/2017 17-1-1_. /o/b / j,--- R�DMS L�' AUG 2017 Submit Original Only ,llrml�ll • 110 Daily Report of Well Operations H-19C ACTIVITYDATE SUMMARY ****WELL S/I UPON ARRIVAL***(Profile modification) DRIFTED W/3.69"WRP DRIFT, S-BAILER, UNABLE TO PASS 9513'SLM (No Sample) DRIFTED W/30'X 2-7/8" DUMMY GUNS, S-BAILER TO DEVIATION @ 9,994' SLM (Tight spots @ 9516' SLM &9549' SLM, Recovered 1 cup soft parafin) RAN 4-1/2"XN LOCATOR (25'correction to xn nipple)TO DEVIATION @ 10,019' MD (Made several passes through problem area w/o issues) DRIFTED W/3.69"WRP DRIFT TO DEVIATION @ 9,997' SLM (10,022' md) No 6/29/2017 issues ****JOB CONT FROM 6/29/17****(Profile modification) DRILFED W/30'X 2-7/8" DUMMY GUNS TO DEVIATION @ 9,997' SLM (2nd attempt, No issues) 6/30/2017 ****WELL LEFT S/I & PAD OP NOTIFIED OF STATUS UPON DEPARTURE**** ***WELL SHUT IN UPON ARRIVAL***(SLB E-LINE PERFORATING) PJSM, RU, PT. RUN 1: RIH W/ HEAD/ERS/EQF-46 X2/UPCT/WPSA/31'X2.88" POWERJET HMX, 6 SPF, 60 DEG PHASED. OAL= 55', OAW=500LBS, MAX OD =2.88. LOG CORRELATED TO BAKER RPM DATED 28-MAR-2015. PERFORATE 9904'-9934'. MINUS 1' CORRECTION TO REFERENCE LOG. 7/8/2017 ***JOB CONTINUED ON 9-JULY-2017*** ***JOB CONTINUED FROM 8-JULY-2017***(SLB E-LINE PERFORATING) RUN 2: RIH WITH HEAD/ERS/EQF46 X 2/ UPCT/WPSA/BST#10/WEATHERFORD 4.5"SC WRP, OAL= 34', OAW=300LBS, MAX OD=3.69", LOG CORRELATED TO BAKER RPM DATED 28-MAR-2015. SET PLUG ME @ 9980', TOP OF PLUG @ 9979'WITH GOOD INDICATION. RDMO. 7/9/2017 ***WELL LEFT SHUT IN UPON DEPARTURE*** � - CNV Pv EVOY r H -19 C " VVH_LIfAD= I�EVOY • S NOTES: WELL ANGLE>70°@ 10009'"*SEE ACTUATOR= BAKER C PG.2 FOR PREVIOUS WELLBORE"""4-1/2"CHROME tNI1AL KB.ELE 80.3' 1 TBG&SOLID LNR""'MAX DLS:16°@ 9849'"'" BF.ELEV= 44.38' KOP= 3400' 20"COND, - —110 9] ' 2019' _14-112"HES x NP,D=3.813" Max Angle= 104°©10767' Oat�nMD= 10117' # — D=? DaturnTVD= 8800'SS SN = 2599' —19-5/8"DV COLLAR 13-3/8"CSG,72#,L-80,D=12.347" ---1 2666' TOP OF 7"LNR —1 3072' .i...........-- 3072' —19-5/8-X 7"BKR HIDE ZXPN LW w/TEBACK,D=6.190" 9-5/8"CSG,47#,L-80 BUTT,D=8.681" — —3239' 3088' H 9-5/8"X 7"BKR FLEX LOCK HGR,D=6.210- 9-5/8"WHPSTOCK(05/15/14) --1 —3239' 9-5/8°FALLOUT WINDOW(H-19C) 3239'-3256' Minimum ID = 3.725" @ 9460' GAS LFT MANDRELS 4-112" HES XN NIPPLE ST M) TVD DEV TYPE VLV LATCH FORT DATE Li 4 3626 3614 19 K8G2 DOME BK 16 06/19/14 3 5988 5604 46 KBG2 SO BK 20 06/19/14 2 8013 7244 33 KBG2 DMY BK 0 06/10/14 1 9291 8320 31 KBG2 DAY BK 0 06/10/14 ' ' 9326' H4-1/2"HES X NP,D=3.813" z z1 9355' ..._17"X 4-1/2"HES TNT PKR,D=3.873' ' ' 9389' —14-1/2"HES X NP,D=3.813" ' 9460' —14-1/2"I IM XN NP,D=3.725" 4-1/2'TBG,12.6#,13CR 85 VAM TOP, H 9490' 9486' H7"X 5"BKR LTPw/SEAL ASSY,D=4.310" .0152 bpf,D=3.958" 9490' —14-1/2"WLEG,D=3.958" 7"CSG,26#,L-80 VAM TOP HC, —1 9713' HELM)IT NOT LOGGED D=6.276"(BTM 2 JOINTS=BTC CONNECTIONS) PERFORATION SUMMARY 9535' —17'X 5"BKR HRD-E ZXPN LTP,D=4.320" REF LOG:MWD by Vision Svc ON 06/08/14 9560' —I 7'X 5'BKR DG FLEX-LOCK HGR,ID=4.310" ANGLEATTOP PERF:56°©9903' IR �_� , 9569' --15"X 4-1/2"XO BUSHING,D=3.880' Note:Refer to Production DB for historical perf data 9979' J-1_4-1/2"WFT WRP(07/09/17) 1 SIZE. SPF IVTERVAL Opn/Sqz SHOT SQZ _ HES SYYELL PACKERS NOTE 4-1/2",12.6#,1-80 HYD 521 SLOTTED LNR NO SIZE TOP DEPTH BOT DEPTH MN D 2-7/8" 6 9903-9933 0 07/08/17 12: *I 5 4-1/2" 9731 9771 3.958° 4-1/2" SLOT 11129-12186 SLTQ'C 06/08/14 , i 4 4-1/2" 10931 10970 3.958" 4-1/2" SLOT 12495-13112 SLTLYC 06/08/14 ' ' 3 4-1/2" 11089 11129 3.958" 2 4-1/2" 12186 12227 3.958" 1 4-1/2" 12425 12466 3.958" NOTE 4-1/2",12.6#,13CR-85 HY D 521 SOLID LNR RA TAGS AT 11-E BOTTOM OF FKR ELEMENTS 9575-9731 12289' H4-1/2"WFD CBP(07/15/15) 9771-10931 10970-11089 ' 12227-12425 PBTD —I 13112' 4-1/2"LNR,12.6#,13CR-85 HYD 521, —1 13114' • , .0152 bpf,ID=3.958" DATE AID 3 COMENTS DATE REV BY COMMENTS PRU)HOE BAY UNIT 01/31/83 RIG IMTIAL COM PLETION 06/17/14 JT/JMD MAL OCE APPROVAL WELL: H-19C 11/04/87 NI ES RWO 06/24/14 DLW/JMD GLV GO(06/19/14) PERMT No:"2140550 07/08/98 NORDIC CTD SIDETRACK (1-1-198) 09/15/14 JT/J141) ADDED RA TAGS PER ST(6/12/14) API No: 50-029-20883-03 06/12/14 D-25 SIDETRACK(H-19C) 07/31/15 BLS/AVD SET MP'(07/15/15) SEC 21,T11N,R13E,590'FN.&1735'FEL 06/16/14 JMD DRLG HO CORRECTIONS 07/12/17 NXW/.MSD ADE FS&SET WRP(07/08-09-17) 06/17/14 JT/JMD ADDED SOLD LNR NVTERVALS BP Exploration(Alaska) STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COM ON REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations ® Fracture Stimulate ❑ Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:5C 71" e)13P © YTL 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 214-055 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20883-03-00 7. Property Designation(Lease Number): ADL 0028284 8. Well Name and Number: PBU H-19C 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 13116 feet Plugs measured 12290 feet [ true vertical 8760 feet Junk measured feet DEC 0 9 2015 Effective Depth: measured 12290 feet Packer measured 9357 feet true vertical 8739 feet Packer true vertical 8376.95 feet ® CC Casing: Length: Size: MD: TVD: Burst: 9'9 Collapse: Structural Conductor 80 20"x 30" 45-125 45-125 Surface 2614 13-3/8"72#L-80 44-2659 44-2658 4930 2670 Intermediate Production 3201 9-5/8"47#L-80 40-3242 40-3240 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 11129 12166 feet 12495-13112 feet True vertical depth: 8741-8736 feet 8753-8760 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr8 38-9493 38-8492 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): 4 ?O i. Treatment descriptions including volumes used and final pressure: i t r11 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 173 2515 2260 1000 182 Subsequent to operation: 29 2764 674 860 178 14.Attachments:(required per 20 AAC 25.070.25.071,8 25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory ❑ Development Q Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 0 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro)6:4,L) Title PDC Principal Engineer Signature A /ip�L) Phone +1 907 564 4424 Date 12/9/15 Form 10-404 Revised 5/2015 �/f1„r! I /73/,_5.-- �(�RBDMS DEC 15 2015 �/�, Submit Original Only • • • a o 0 0 0 0 0 0 o 0 0 ca icor 000 00v N r` v In In In In In In In p N "ct CO r• ti co U y 0 0 0 0 0 0 0 0 0 0 L CO I-- 'sr CO CO CO N CO CO N 7 O) 00 N 'TrV '7 O 'ct o CO Nt co co 00 co O) CO CO 6) Ln 00 O N CO CO CO O O N NV N- Cfl CO co in co CO (0) CO N CO Ln Ln N N- r` N, V N M 00 00 CO C10 00 00 00 00 M O N O Cfl CO CO V O r` CO CO CO Ln LO CO V tt "Cr O V Ln I� r` ti CO CO CO CO CO CO CO CO I O N (0 (fl CO O) 00 NCO 01 LO V v- N N CA (.0 N r` in Ln N N co N CO CS) O) O7 co O) O p i i i i i i •WU QLn 0) CO N 0) (0 co LnvO � Do ("1wrnrnco V ON N .4- co _ M CO O in Ln a o 0 co 0� co 0� co 0 02 co °° U °DU0? ?0 C - -J J c J CO J J CO CO O *k k *k 1k • 0 CO N # J CO 4$ (D (0 CO �$ .N f) 00 N CO O M (3 N N N 0 N 0\0 - U co Lf') I� N N r N t r r O C 00 Cfl N (0 CO N o M COCO J N M M Z a0 0 F- 15 U 0 U O CILL O CtfYO c Z Z Q' 0 W W W W W W W m 0 D c Z Z Z Z Z Z Z D U (n d J J _1 J J J J I- • • Packers and SSV's Attachment PBU H-19C SW Name Type MD TVD Depscription H-19C PACKER 3075.16 3074.39 7" Baker ZXP Top Packer H-19C TBG PACKER 9357.49 8376.95 4-1/2" HES TNT Perm Packer H-19C PACKER 9500.38 8498.45 5" Baker ZXP Top Packer H-19C PACKER 9538.12 8529.91 5" Baker ZXP Top Packer H-19C PACKER 9733.26 8691.02 4-1/2" HES Swell Packer H-19C PACKER 10933.64 8786.6 4-1/2" HES Swell Packer H-19C PACKER 11091.81 8749.48 4-1/2" HES Swell Packer H-19C PACKER 12189.04 8736.12 4-1/2" HES Swell Packer H-19C PACKER 12428.14 8749.98 4-1/2" HES Swell Packer 0 S \/ O2 \ LL c4C /2G / co k \ E k w p c g G _.§ P — .§ / CU— / 1 a) \ = 7 / / x Z a e m 2 * I , I o W \ \ EiQTD - ƒ CD Cl/ \ f / \ / / E> � \ f % • '6 o - \ / CO ® CD , Ao — co / \ 0 f = o ± . 52 ° \ nE CD 2 ƒ ... ml— c$ f E ■ < ' 5 ® E o ■ r H \ / \ \ / % 0 R % U 2 ,. 7 E w ® OUm / R2 - \ moo 2 2 / / \ O 2 % f ƒ / » * - i / \ / I \ % ƒ a. .L �0k -0 / o � ƒ : t13 a) _ § t 0 �I � =/ —E / S/ w < $ Ce a@ $ o 4 g@ ° 0 2 g 0 / _ / / / / © ^ Im _ . 2 ca / / k \ \ / / / / E � tO ƒ k 6DIm _ E ® \ 2 E $ a \ / / k / § 0 / + ' ' c © ± � � © Ia = k ± \ / t £ \ \ \ o \ = f 2 ea c U a / 0 2 & ° 2 7 0- G = a ----- 2 © � \ 2 2 k k / k D .frv0 ( 2 .% i /k - gj / R = — _ - R — G w g S \ •® 6 002W : Q O I U 2 E w -3 7 r ± \ N- © I- / - / 8 / 5 m ^ ,– / \ \ < WELLHEAD= CN"MCEVOY • H -19C lliTY NOTE: WELL ANGLE>P RPREVI WELLBORE 704@1/2"CHROME ACTUATOR= BAKER C UAL KB.ELE 80.3' I I TBG&SOLID LNR""MAX DLS:16°@ 9849'"' BF ELEV= 44.38' /f KOP= 3400' 20"COM, —I —110 , ' r—20177—L14-12'I-ES X NP,ID=3.813" Max Angle= 104°@ 1076T # DaturnMD= 1011T D-? Datum TVD= 8800'SS mi m. mgi 2599' 9-518"DV COLLAR—1 13-3/8'CSG,72#,L-80,D=12.347' 2655' TOP OF 7'LNR3072' h. 3072' ,—9-5/8"X 7'BKR HR -E ZXPN LTP 4--------,,,,,_ w!TEBACK,D=6.190" 9-5/8"CSG,47#,L-80 BUTT,D-8.681" -3239' 3088' —19-5/8'X 7"BKR FLEX LOCK HGR,0=6.210' 9-5/8'W FSTOCK(05/15/14) —1 —3239' 9-5/8'MLLOUT WINDOW(H-19C) 3239'-3256' Minimum ID = 3/25" @ 9460' GAS LFT MANDRELS 4-1/2" HES XN NIPPLE ST AD TVD DEV TYPE VLV LATCH PORT DATE 4 3626 3614 19 KBG2 DOME BK 16 06/19/14 L. 3 5988 5604 46 KBG2 SO BK 20 06/19/14 2 8013 7244 33 KBG2 DMY BK 0 06/10/14 1 9291 8320 31 KBG2 DMY BK 0 06/10/14 1 ir- ---! 9326' H4-1/2"HES X MP,D=3.813' z x. 9355' 7"X 4-1/2'HES TNT PKR,D=3.873' ' , 9389'_-14-1/2"HES X NIP,D=3.813 ,----1 9460' —{4-1/2"HES XN NP,ID=3.725' 4-1/2"TBG, 12.6#,13CR-85 VAM TOP, H 9490' 9486' H7"X 5'BKR LTPw/SEAL ASSY,D=4.310' .0152 bpf,ID=3.958" N ://n{ 9490' H4-1/2"W-EG,D=3.958' 7'CSG,26#,L-80 VAM TOP HC, —I 9713' I D=6.276"(BTM 2 JOINTS=BTC CONNECTIONS) —IELMD TT NOT LOGGIi-1 PERFORATION Sl1ARAARY \17-\ 9535' --(7'X 5'BKR HRD-E ZXPN LIP,D=4.320' REF LOG:MWD by Vision Svc ON 06/08/14 9560' 7'X 5'BKR DG FLEX-LOCK HGR D=4.310' ANGLE AT TOP FEW:NIA , 9569' —1 5"X 4-1/2"XO Bl1SFING,D=3.880' Cgl Note:Refer to Roduction DB for historical pert data SIZE I SR= NTERVAL Opn/Sgz SHOT 1 SOZ ® HES SWELL PACKERS NO SIZE TOP DEPTH BOT DEPTH MN ID NOTE 4-1/2",12.6#,L-80 HYD 521 SLOTTED LNR ® 5 4-12' 9731 9771 3.958' 4-12' SLOT 11129-12186 SLTD 06/08/14 4 4-1/2" 10931 10970 3.958" 4-1/2" SLOT 12495-13112 SLTD 06/08/14 I 3 4-1/2' 11089 11129 3.958" 2 4-1/2' 12186 17127 3.958' 1 4-12" 12425 12466 3.958" RA TAGS AT THE BOTTOM OF FKR ELEMENTS NOTE 4-1/2", 12.6#,13CR-85 HY D 521 SOLE)LNR ----- --------- 9575-9731 12289' 1-14-1/2"WFD C8P(07/15/15)1 9771 -10931 , 10970-11089 12227-12425 PBTD —I 13112' 4-12"LNR, 12.6#,13CR-85 HYD 521, —I 13114' .0152 bpf,ID=3.958" Y 4.*„( DATE AUDI 3 COHABITS DATE REV BY COMIbtD'TTS PRUDHOE BAY INT 01/31/83 RIG 3 INTIAL COMPLETION 06/17/14 JT/JM) FINAL ODE APPROVAL WELL. H-19C 11/04/87 N1 ES RWO 0624/14 DLW/JA0D GLV C/O(06/19/14) FERMI-No: 2140550 07/08/98 NORDIC CTD SIDETRACK (H-19B) 09/15/14 JT/JAAD ADDED RA TAGS PER ST(6/12/14) AR No: 50-029-20883-03 06/12/14 D-25 SIDETRACK(H-19C) 07/31/15 BLS/JM) SET C13P(07/15/15) SEC 21,T11N,R13E,590'FNL 8 1735'FEL 06/16/14 JM) DRLG HO CORRECTIONS 06/17/14 JT/JMD ADDED SOLID UR NTERVALS BP Exploration(Alaska) 0 EC WNW U O Z v CI N W J m v v Lily.- ei QTY ra v OVVI 0 X u v rts L Q • !� v _c _c C LO ir) CD '-',5 C c-,.f CO O L C 5 )mto Q C O O O Cr O C ro Q Q ■a O c0 3 �, y L• v o } ` Q Q Q Q Q Q Q Q E a a v )- W in Up _ z ,yam < Nmi. N N N V C' N N h C) >' a1 7 Q _a. - 0 7 E O T v _, (1., > Q) }' to O O 0 0 0 0 0 0 0 0 0 0 ra v u _c 6 J J J J J J J J J J J , W W W W W W W W W W W bap C 0 LL LL LL LL LL LL LL LL LL LL U. N v E -o vs Od J J J J J J J J J J J Q 4 O v co .. 1- Q Q Q Q Q Q Q Q Q Q Q @ c Z CI O ZZZZZZZZZZZ 0 LL LL LL LL LL LL LL LL LL LL LL v s L1 ../yU a) -c u �.I "r Y+ C) > J-' G • Y C E ) E O v O 0 0 VI Z O OQ v Z 0 Ti v Z F H H a v CO ° > (13Li) LL LL 2 N 7) N I- ;.• O it W O LL 0 N O w 7 7 7 yV 0 O -a 0_ . a U Q Q' J F- d d d N 0 a N 0 LU 2 2 2 \ N c, • d an V 5' j ix s- Lt a O O 0 y - a \ ...� b O z C. J c Fd >J 0 O J -100 Z Z Z . y N > W 1/1 2 23 W W J J J 1 UJ -• Ap '°r lib LLI CD 2 m m m 1- m m v� m m m m v w w W ? W w cTW www E Z 0 0 0 U 0 0 < 0 0 0 0 3 2 2 2 2 2 2 J 2 2 2 2 _-c- -41 X 0 0 0 .. 0 0 0 0 0 0 0 v 7 7 7 Z 7 7 LL 7 7 7 7 to W W WW - CLW saaa OOa a Op T X in o V ,a O N O M O t0 O N U N N M N M M or-- O r- O 0 O O 0 0 0 co 0 O N N SS . 0 0 0 0 0 00000 O 0 0 0 0 0 co 0 0 0 0 CD 6 a LL O v 2 N U U E Q a Q < O O - t0 CO -) M O) • 0 " 0000 0 > O 0 U c co x _ to o O O O M O O - O O N N � Lp 0 0 0 0 0 0 0 0 0 0 0 N. NI 11 M h )A )!') O) O V C' 8 C MM M co co co co V co V V M 'v EO N. O O O N M 0 0 U N N N N N N N N N N N N N C) e) m o) o) o) o) c) C) o) ti) O F N N N N N N N N N N N ..' '� F 0 0 0 0 0 0 O O O O O cu O 0 0 0 0 0 O O O O O •.7 L to to t() )A to In to )n )A N U) a+ O ,) _� W C a V C OD ct in a CO v z E v c di 8 z c ._ Y z �7 Q o o U o o Q OBD M O M M N M a+ E 6�J H mown C Q N 0 0 = a N c, 0 0 £ z N N ECO in Ca 8 y E 1 r a a Q 21 4055 25 66 3 BAKER PRINT DISTRIBUTION LIST HUGHES COMPANY BP Exploration Alaska,Inc. INTERMEDIATE FINAL Yes (mandatory) DATA LOGGED WELL NAME H-19C RUN NUMBER 1 5 /Z/2oib M.K.BENDER* (mandatory) FIELD Prudhoe Bay Unit 1311 SALESMAN Paul Canizares (mandatory) (mandatory) COUNTY North Slope BH DISTRICT Prudhoe Bay,AK (mandatory) (mandatory) STATE Alaska PAGE 1 OF 1 (mandatory) LOG DATE: March 28,2015 TODAYS DATE: 4/7/2015 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: Paul Canizares (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANY A B C D ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) L.I.S. FILM PERSON ATTENTION #OF PRINTS #OF COPIES#OF COPIES#OF COPIES#OF COPIES#OF COPIES 1 ConocoPhillips Alaska Inc. 2 1 I 1 I 1 I I Attn:Ricky Elgaricio RECIE3INMED A= H-19C._MRPM_RAW_BORAX_28MAR2015_BHI.meta ATO 3-344 700 G Street APR 0 9 2015 Anchorage,AK 99510 B= '(Folder 1 on cd/dvd) H-19C_MRPM_RAW_BORAX_28M 2 ExxonMobil,Alaska 1 1 I 1 1 I I Attn:Lynda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr.Suite 600 Anchorage,AK 99503 3 (State of Alaska-AOGCC 1 I 1 I 1 I 1 I I Attn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 4 DNR-Division of Oil&Gas 0 I 0 I 1 I 1 I I Attn:Sean Clifton 550 West 7th Avenue,Suite 802 Anchorage,Alaska 99501 5 I I I I I TOTALS FOR THIS PAGE: 2 SCANNED MAY 0 8 2015 0 0 TOTALS FOR ALL PAGES: 2 1 1 1 0 0 Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. zQi 4 _ QS'Well History File Identifier Organizing (done) o-sided ❑ Rescan Needed RES AN: OVERSIZED: NOTES: Cs,r Items: ❑ Maps: Grayscale Items: ogs: ❑ Poor Quality Originals: ❑ Other: ❑ Other: BY: \1\ aria) Date: I i 6 bc. Is' Illf Project Proofing`!!!! BY: CV aria ) Date: 1 `q IS. /s/ ofiP Scanning Preparation 3 x 30 = 916 +a3 = TOTAL PAGES 1 l 3 (Count does not include cover sheet) Of BY: ( Maria) Date: `ithp,5 /s/ Production Scanning Stage 1 Page Count from Scanned File: 1 1 1+ (Count does include cover eet) Page Count Matches Number in Scanning Preparation: YES NO BY: CO Date: I 1 lb] 15 /s/ rYp Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Stage 2 Additional Well Reports: YES NO TOTAL PAGES: Digital version appended by: Meredith Michel Date: /s/ Final Page Count: Stage 1 + Stage 2: TOTAL PAGES: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: /s/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc i 1 O O el ' N CO 0 0 p C U C C O 1 6 ,a co z c c c c n 3 OJ CO is N 0) I o N N UO LO 5. C C 1rc N U m 'UCO O coi o of o 2 ao d co c O1/46 in O o) ^ O >I E 'Z o Z Z Z 7 > > '� 1 v m e T O co — v y 0 0,� a) 0,� N O a) CO 2 N = •O u•, 0 2 w co ce cn cn 15 u) u)•o To 2 2QD 2 0 =o aa) ) ai:> z 0 z z a z z LL c co (� >, Z ai ai 0 a Z 1 2 iEm OO7 Oo 0 °) Do Om LL — — 0 p E a EE 0 co E cnLL cn� cna (nom c c c U co CD Q ) � a)ct > > o > a) > o > vo Q it it cn Q a) ,- a) a)m To co I LL z U" U J U O 0 J O O U 0 O U m LL al 2 E LE_ 0 g -O o)>v� 0) 0 0)g 0) a) O) C) o) a) o) LU _ E• _ _ I°' N76 o -o o .o O 0 w0 ow J O y <n(n 2 N cp 2 1 2 0 2 ; 2 a, 2 2 2 2 S �� W w > ✓ p O C'a, o 0cc c0 0.0 0 p 0.O i0 0 0 N N 0 N~ 0(n co ? m p 0 LL z p LL LL LLcl' it it it it LL 0 Q it J 0 y N LL o E' 00 00°> 0 0 Oce1:2 CD g O .02 a)cc o y 0 a� 0a 0-0 0cC 7 O EI'C ' C O C o C C U C C C C C x O C x .0 a) C N m o) O o c o 5 a o 0 0 O a) 0 0 0 0 o X 2 wp o w O!E O z g cn _ V I 0 2 i)50 E ) c)p i.p v v v cd ,Q I n O 0 0 a) 0 0 _0p 0> 0p a)> 0 0 0 a) m vw cu 0, 0 E a)u, ce Q EO IW In Cu'O 0 W 2 W H W 2 W H W W W W -0 N 2 W.- W(n W> O Z O U c v'',v v v v v c v v v v cn )n Tr aY > 0 0 0 0 0 0 0 0 0 0 0 0 c) w 'd'N N N N N N N N N N N N N W l7 CO Co co Co OD Co CO CO 0) 0) ZZ IX 0 COCO r r a-. W w — p. - O. a- --I 22 UO. c) coZ ,_ cn Lu Q o o m co COco co co0 o. CO CV O. CO ) C.) a0 OI CO o Lc) c z o 5 r o 0 0 5 O U 10 O G O O (/� M M M N O � E ). w U U co p c M o D 7 0 Q O z zCa A can- w �v z Tr cc 0 J2 • N Ct 0 0 M Q O V W m m p J fA COM 10 p m pcn a a oCCLU I"'" a �1 ct z E z 0 0 d 0 o p c E J m Z 7 2 CO CO CO CO CO CO CO CO CO f0 N (0 CO CO a) co co CO co f0 co co co CO co 'O c0 co co 0 C E p 0 0 0 0 0 0 0 0 0 a) 0 0 0 co 7 a) co CL Z m m m m m m m m m m I o m m o) p 0 0 0 0 0 0 0 0 0 J 0 0 0 10 >0 0 y Coy co co Co Co CO CO Co CO Co Co Co CO co N H # O V V R C V C C V V R V V V a0 Q Z -C C N CO 7 V V V V V V V V V tt V R V R N 2 0 5 « w 0 z N N N N N N N N N N N N N N 0 rt Q C E LL •` c0 z 2 ` o "' LL 0 I 0 0 c O1-O w wp[ Z 2 U 0 0 0 0 0 U U U U 0 0 0 0 E 5 a w J 0 y 0 1- c. o 0):° 0. O 0 0 0 0 0 0 0 0 0 0 0 0 0 a. C 0 I 3 -10F'Iw w LU w LU w LU LU w w J LU w LU o C . 0) cb o o N N LC) L0 • + V ••O 1 4. T T T T T T a y Z L0 ai N 0 p OooO ' ' ' 'j 'j 'j a) _ N 0 W W W W W O 2 2 f6 m U m 8� �� 2 0 IX o ra C = II Z Z Z Z Z Z LL ca >. _ °'£ y U Z y .� cm 0 0 0 O� O Oo a m m 2 2 .w cocci �cm cow 0 0 i to c_n �a c_nd c c 3 Z w > z a) z w z m �g c Z > > >LL > m >W > m Q W V) ❑ Ev) Om Om Om > 3 4_ ❑ ❑ co CO CO co aCO a s a am s a.Sm aw w a Q mw > >> >> 0 ,- m . co o 0 U_ U_1 OE UOE O O U U LE z U^ U. U_• 00 2 3 2 ± E 2 0 ± E 2 m 2 2 2 2 I N 2Z 2Z 2"(7)-7 20 Z O aim him 6— 6W 6— aice 6 6 6 6 ❑ m o 0W wW wW m wr LL❑ Il ❑ LL N I1 U LL N LL u) LL LL LL it W ❑ N LL Z IL z LL z ❑ LL C . „. (0 I U N u0 V W u2 UW UD g U N U u wcn oU 00 Up c)p?? �5 a) N m ' 2i= o f 22 O H 22 2Zo - 2 2 y 2 1:27 2 W O V N 2 5 e 5 O 2 E g m m o❑ 25 > > ° E (n U— U 16 U L U L U L U L U U c U U m Q U it U p U p U p E U O O O) y N y N U N U N U N U N N'p N N m W O co N y N y O N O O C) Ce Q E' w W w W w e w E w E w E w w d w w Z c i 2 Dm MO 00 000 0E 0 OZ 3 v v v v v v v v v v v v v v v a„ °� U CL o 0 0 0 0 0 0 0 0 0 0 0 0 0 o EN E W 2 (N N N N N N N N N N N N N N N CO 7 LO cT) cc) u) to u) LC) LC) CV u) m m m co 0V) Z 63 I EL W w a 4 Cl. 9- o. v V a. 0 •d Zco o Qx ` coN o a) m J o N r `s E o o 0 M • 5'1 p• E I 0 - 1 1 1 c.)0 4C co P. _ a li z .o- 5 _ rn o m C N CD cQCO CV CD m c M iii O m (0 CO I m C D▪ ❑ I Q re `• s I-- . 1. Q c a Z O CI c d U E m m U i Z w m m m m m m m m m CO N CO CO CO CO CO m CO CO CO CO CO CO CO CO CO CO •O CO CO m CO CO m ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ami 0 0 ❑ 0 0 C m co co ca ca co co CO CO CO 2 CO CO CO CO CO C oo ftt E) .o) 'o) m rn '5 • . •m m 'rn m rn •_ rn )5 'm Iii o ❑ to 0 0 0 0 0 0 0 0 0 o 0 0 0 o E in > IN. N r` r` r` N. N. F F N N o 0 0 0 0 ' O o▪ i— .02 CC) L0L0 UU) uC) U)) loo �L) chi) IL) IL) lCO CO (0 COcocco cco cmo coC et 1 v v v v v v c v v v v v v V v v r N N N N N N N N N N N N N N N N d N a d E E tofA m p Z 12 w �, U 0 0 0 0 0 U U U U 0 0 0 0 0 0 O C7 0 0 wwWwwwWWW ❑ O ❑ WWWWOd 2 W JW 3 o - 90 M N M co o z >- >- I Er. U a m 1 Q m °' a U• U1- J z- j C ` ) H g co N o Ce Q a p " O Z o = coTo 0 wco 1 IL a; Ce o Lt. ii E x a) • vi a) W J a) O) d U m (71 E J E co z � ,— N .2 u) Q w O N O 0) _ • Co o J 0. c J v E o 0 'o 2 U 0 u) a {n c 2N ga) O v aE � wrU U G } Q E M Q rn c0— c a I— _ `° I �_ co o CN/ O a) c c0 m Q 0 a) E CO co o H E M p a, CO w d CI co • pco II Q re O TO O. 1.. ) U n 11 Q o a o m O E c:).„......._______) 0 U r >, 0 E L) o t o m z a) v o Z N COCV o p G o 5, m to ~ v E`o o 0 3 N w rt N a) rec O y = N > 7.- ( 0 Q a) Y Va) w p y c � G F c0 iti a) O • Q O < cZ 0 co 0 c c (..., pa) U J N— Co m CO U a o o c. y 0 E a. O — E 2 o E d , E E Q a a a o aQ 0 0 a 0 0 In ID O 9 cIoo ° o _ a Oa ea Tu- vted@ N li 1` �[fl aan `~ Nr4fY co C >.••+p S u N �\+llX1 • L •- f0 + �"� • O cc Z to. C 0 >,- O f0 +., a, a CS -0- 4.. O O oIt. O OfONO t u EL < -, u u fa m aR N = Q) = CUJ FL , N C O - \ u W. C Y i 0 ' O c r O fn Z l7; c Z O, , v a > a ,,,' -, D v O o 0 H F CO 4.+ u4-, U C1) 10 -0 C C L y L fU C ' ++ ✓ (v ` - ,L • U f6 colCCC O fl) N N W. Li _c cu w (I) _ > N *7-: *L. Q; U Y L u > r• , < 0 E a, '‘) + p: cc fn a. N cu 15 + O a c O to a . it r-. Ft- > V N f0 C gO v Q fL a. 1 a. dO Zt .CS o. .> M u (/� W N VLU C o = ate • o I x 70 to ;f c0 o W .J 0 u U Ci W' ..... v.,0 A c., ,, 6Y ..:1' z 6 a P.,‘ f=H tDe O NX u x MIR fa ' W Q @ -r Ca_ U � Z111 0 v � fn 0 W C!1 C = uu W rn a u o vo m E U o o > W Q L W Y O _d W VI G N A' y L L Q 3 Liil!l c a pi U c �' Fii ,423 Ff, � � -.n c o, W �d C - •. zg � '" Y 7: ` yr d O ^� E c, z vii co tf1 ce = C L _ fo V, gp v v, N u r y fa C/� �i N zd H a a 7 RECEIVED STATE OF ALASKA JUL 10 2014 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOO °OGCC la Well Status' ®Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended lb. Well Class 20AAC 25105 2OAAC 25110 0 Exploratory 0 Stratigraphic 0 GINJ 0 WINJ 0 WAG 0 WDSPL ❑Other No.of Completions One • • ®Development 0 Service 2. Operator Name. 5.Date Comp.,Susp.,or Aband. 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 6/12/2014• 214-055 • 3. Address' 6.Date Spudded: 13 API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 5/16/2014 • 50-029-20883-03-00 • 4a. Location of Well(Governmental Section). 7 Date T.D.Reached 14. Well Name and Number: Surface: * 6/7/2014 • PBU H-19C 590' FNL, 1735' FEL, Sec.21, T11 N, R13E, UM 8. KB(ft above MSL). 15. Field/Pool Pool(s)of Productive Horizon: ) 83.91'• ( ) 2012' FNL, 3146' FEL, Sec.21, T11 N, R13E, UM GL(ft above MSL): 43.08'. Prudhoe Bay/Prudhoe Bay. Total Depth. 9.Plug Back Depth(MD+TVD) 4906'FNL, 1867'FEL, Sec.21,T11N, R13E, UM ' 13112' 8760' 4b. Location of Well(State Base Plane Coordinates,NAD. 10.Total Depth(MD+TVD) 16. Property Designation: Surface' x- 642839 • y- 5960189' Zone- ASP4 • 13116' 8760' • ADL 028284' TPI: x- 641458 y- 5958741 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 642799 y- 5955871 Zone- ASP4 None 18. Directional Survey: ®Yes 0 No 19.Water depth,if offshore: 20. Thickness of Permafrost(ND). (Submit electronic and printed information per 20 AAC 25 050) N/A ft MSL 1900' (Approx.) 21 Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071). 22. Re-Drill/Lateral Top Window MD/TVD: MWD/GR/RES, MWD/GR/RES/NEU/DEN, Microscope RES 3239' • 3237' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT.PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20"x 30" Insulated Conductor Surface 110' Surface 110' 36" 8 cu vd 13-3/8" 72# L-80 40' 2655' 40' 2655' 17-1/2" 3720 cu ft 9-5/8" 47# L-80 36' 3239'• 36' 3237' 12-1/4" 1647 cu ft 7" 26# L-80 3072' 9713'• 3071' 8675' 8-1/2" 227 sx Class'G' 4-1/2" 12.6# 13Cr85/L-80 9486' 13114'• 8486' 8760' 6-1/8" Uncemented Solid/Slotted Liner w/Swell Packers 24. Open to production or injection? • ®Yes ❑ No 25 TUBING RECORD If Yes,listeach interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD) (MD+TVD of Top&Bottom,Perforation Size and Number): 4-1/2"Slotted Liner 4-1/2", 12.6#, 13Cr85 9490' 9355'/8375' :rrT• t 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC.• 11129' 12186' 8741'-8736' Pla WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ®No • . 12495'-13112' 8753'-8760' .,ttr--f DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 2200' Freeze Protect w/151 Bbls Diesel 27. PRODUCTION TEST 1 Date First Production Method of Operation(Flowing,Gas Lift,etc June 23,2014 Flowing Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE' GAS-OIL RATIO' 6/24/2014 8 Test Period ♦ 287 498 283 128 1732 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL OIL GRAVITY-API(CORR)' Press 0 1000 24-Hour Rate 4 862 • 1493 • 849 • 26.7 • 28. CORE DATA Conventional Core(s)Acquired? 0 Yes IS No . Sidewall Core(s)Acquired? 0 Yes ®No . If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed) Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. NoneII RBDMS JUL.11 20144 Form 10-407 Revised 10/2012171.- 0/2012V` 3/3 1(/l 4 CONTINUED ON EVERSE ` / Submit Original Only G 1�//y sV ,1(•1c 29. GEOLOGIC MARKERS(List all formations and mr ;encounter 30 1RMATION TESTS NAME ML ND Well Tested? IL . IN No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25 071. Ugnu 4133' • 4099' None West Sak 5505' • 5276' Coleville Mudstone 6142' . 5710' HRZ 7748' • 7024' Miluveach 8081' • 7301' Kingak 8155' . 7363' Sag River 9710' • 8672' Shublik A 9739' 8696' Shublik B 9774' • 8723' Shublik C 9810' 8750' Sadlerochit-Zone 4B 9851' ' 8779' Shublik C(Invert) 10673' 8847' Shublik B 10764' 8826' Shublik A 10845' 8807' Shublik B(Fault) 10952' 8782' Shublik A 11057' 8758' Sag River 11193' 8730' Formation at Total Depth: Sag River(From Base) 11193' 8730' 31.List of Attachment. Summary of Daily Drilling Reports, LOT/FIT Summary,Well Schematic Diagram, Surveys, Cement Report 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact. Jacob Thompson,564-557 Email: Jacob.Thompson@bp.com Printed Name Joe Lastu Title. Drilling Technologist Signature: �, Phone 564 4091 Date. �S�I� INSTRUCTIONS General. This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la. Classification of Service Wells. Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b. TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20 Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation' Flowing,Gas Lift,Rod Pump, Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only TFEE= OWH4-1/16" WELLHEAD= M EVOY H -19C -19C SAFET TES: WB.L ANGLE>70"@ 10009'""'SEE ACTUATOR= BAKER PG.2 FL REVIOUS WELLBORE"'4-1/2"CHROME RITIAL KB.R F 80.3' 1 I TBG&SOLID LNR*"""MAX DLS:16"@ 9849' "' BE REV= 44.38' /f KOP= 3400' 20"COND, —{ -110 , ' 2019' 1....14-112"HES X NP,ID=3.813" Max Angie= 104"@ 10767 # Datum NO= 10117 Datum TVD= 8800'SS ? i 2599' H9-5/8"DV DOLLAR 13-3/8'CSG,72#,L-80,D=12.347" H 2655' TOP OF 7"LNR -{ 3072' 3072' -9-5/8"X 7"BKR HRD-E 2XPN LW 9-5/8"CSG,47#,L-80 BUTT,0=8.681" -1 -3239' ►s \ w/TRACK,ID=6.190" 3088" -19-5/8"X 7"BKR FLEX LOCK HGR D=6.210" 9-518"WHPSTOCK(05/15/14) -( -3239" 9-5/8"MLLOUT WINDOW(H-19C) 3239'-3256' Minimum ID = 3.725" © 9460' GAS LIFT MANDRELS 4-1/2" HES XN NIPPLE ST MD TVD DEV TYPE VLV LATCH PORT DATE IA 4 3626 3614 19 KBG2 DOME BK 16 06/19/14 3 5988 5604 46 KBG2 SO BK 20 06/19/14 , 2 8013 7244 33 KBG2 DMY BK 0 06/10/14 1 9291 8320 31 KBG2 DMI' BK 0 06/10/14 ' 9326' -4-1/2"HES X NP,0=3.813" Z1 X 9355' _17"X 4-1/2"HES TNT PKR,D=3.873" 9389' -14-1/2"HES X MP,D=3.8137- 1 9460' H4-1/2"HES XN NP,ID=3.725" 4-1/2"TBG,12.6#,13C R-85 VAM TOP, H 9490' 9486' --{7"X 5"BKR LTPw/SEAL ASSY,ID=4.310" .0152 bpf,ID=3.958" 7"CSG,26#,L-80 VAM TOP HC, -{ 9713' / 9490' -14-1/2"WLEG,D=3.958" ID=6.276"(BTM 2 JOINTS=BTC CONNECTIONS) :-\ -B TT NOT LOGGED PERFORATION SUMMARYIO 9535'�-17'X 5"BKR HRD-E 2XPN LTP,ID=4.320" RET LOG ON XX/XX/14 9560' -{T X 5"BKR DG FLEX-LOCK HGR,ID=4.310" ANGLE AT TOP PERF:MA 9569' -15"X 4-1/2"X0 BUSHt4G,D=3.880' Note:Refer to Production DB for historical perf data SCE SPF IsITERVAL Opn/Sqz SHOT SOZ 2:1 181 CEI RI NOTE 4-1/2",12.6#,L-80 HYD 521 SLOTTED LNR 4-1/2" SLOT 11129-12186 SLID 06/08/14 IES SWELL PACKERS 4-1/2" SLOT 12495-13112 SLID 06/08/14 , NO SIZE TOP DEPTH MN ID 5 4-1/2" 9731 3.958" 4 4-1/2" 10931 3.958" 3 4-1/2' 11089 3.958" 2 t 2 4-1/2" 12186 3.958" NOTE 4-1/2",12.6#,13CR-85 HYD 521 SOLD LNR 1 4-112" 12425 3.958" 9575-9731 9771 -10931 10970- 11089 12227- 12425 PBTD — 13112" 4-1/2"LNR, 12.6#,13CR-85 HYD 521, -{ 13114' ' ' .0152 bpf,ID=3.958" f DATE AUDI 3 COMMENTS DATE REV BY COMvt3'TTS PRUDHOE BAY (.NT 01/31/83 RIG 3 IMTTAL COMPLETION 06/17/14 JT/JMD FNAL ODE APPROVAL WELL. H-19C 11/04187 N1E5 RWO 06/24/14 DLW/JM)GLV 00(06/19/14) PERMT No: `2140550 07/08/98 NORDIC CTD SIDETRACK (H-19B) AFI No: 50-029-20883-03 06/12/14 D-25 SIDETRACK(H-19C) SEC 21,T11 N,R13E,590'FNL&1735'FB 06/16/14 JMD DRLG HO CORRECTIONS 06/17/14 JT/JM3 ADDED SOLID LNR NTERVALS BP Exploration(Alaska) BP AMERICA LOT / FIT Summary Well Name: H-19C Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD-Ft) (TVD-Ft) (ppg) (psi) (BHP) (psi) (ppg) 05/15/14 LOT 3,239.00 3,237.00 9.60 400.00 2,014.30 11.98 06/02/14 FIT 9,734.00 8,689.11 8.60 435.00 4,316.90 9.56 Page 1 of 1 North America-ALASKA-BP Page 1 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 5/10/2014 03:00 - 06:00 3.00 MOB P PRE RIG DOWN OPERATIONS -SCOPE DERRICK -BREAK LINES,POWER DOWN MAIN POWER, SWITCH TO COLD STARTS -DISCONNECT MODULE INTERCONNECTS LOWER C SECTION AND LOWER CATTLE SHOOT 'WALK OUT AND STAGE COMPLEXES MOVING RIG MATS OVER TO H-PAD 06:00 - 12:00 6.00 MOB P PRE RIG DOWN OPERATIONS WALK OUT AND STAGE COMPLEXES PREPARE AND LAY OVER DERRICK -WALK THEM OUT TO BE MOVED -STAGE RIG MODULES IN ORDER READY FOR RIG MOVE MOVING RIG MATS OVER TO H-PAD 12:00 - 00:00 12.00 MOB N WAIT PRE WAIT ON PAD PREP ON H-PAD LOADING AND PREPPING WORK PLATFORM IN THE BOPE DECK -WASHING WIND WALLS-PERFORMING PM'S 2-3 GAL HYDRAULIC SPILL FROM BLOWN HOSE ON CH2MHILL LOADER. -CH2 NOTIFIED SPILL RESPONSE AND INITIATED A TRACTION REPORT 5/11/2014 00:00 - 05:00 5.00 MOB N WAIT PRE WAIT ON PAD PREP ON H-PAD -RIG MOVE PREPARATIONS LOADING AND PREPPING WORK PLATFORM IN THE BOPE DECK -WASHING WIND WALLS-PERFORMING PM'S -ALL MODULES STAGED IN ORDER FOR MOVE. STARTED LAYING RIG MATS FOR RIG TO SIT ON. 05:00 - 08:30 3.50 MOB P PRE LAYING RIG MATS -SPOTTING TRUCK UNDER MODULES FOR RIG MOVE Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 2 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:30 - 21:30 13.00 MOB P PRE -MOBILIZE SUB FROM B-PAD TO H-PAD,SUB ON B-PAD AT 12:30 -MOBILIZE PIPE AND CASING SHED FROM B-PAD TO H-PAD. -ENTIRE RIG ON H-PAD AT 21:30 -STAGE AND SPOT SUB IN PLACE OVER WELL, BARRIERS FOR MIRU: TBG-CMT PLUG,KWF,TWC IA-CMT PLUG,KWF,ANNUALR VALVE, TUBING PACKOFFS OA-ANNULUS VALVES,INNER CSG PACK OFFS. **GAVE 24 HR NOTIFICATION OF BOPE TESTING TO THE AOGCC THROUGH THE WEB SITE FORM** -RECIEVED EMAIL NOTIFICATION FROM JEFF JONES W/AOGCC WAIVING WITNESS OF UPCOMING BOPE TEST. 21:30 - 00:00 2.50 RIGU P PRE ALL SIX MODULES ON H-PAD -STAGE AND SPOT PIPE SHED&CASING SHED& PIN IN PLACE. -START WALKING REMAINING MODULES IN PLACE. 5/12/2014 00:00 - 06:00 6.00 RIGU P PRE ALL SIX MODULES ON H-PAD -STAGE AND SPOT PIPE SHED,CASING SHED AND PIT MODULES& PIN IN PLACE. -HOLD PJSM RAISE DERRICK -HOLD PJSM -REDUCE HYDRAULIC PRESSURE TO 1,500 PSI AND RAISE DERRICK -UN-PIN AND SECURE MAST CYLINDERS SKID RIG FLOOR -HOLD PJSM -INCREASE HYDRAULIC PRESSURE TO 2,400 PSI -SKID RIG FLOOR TO DRILLING POSITION -WALK IN AND MARRY REMAINDER OF MODULES TOGETHER -CONNECTING INNER CONNECTS RAISE CATTLE CHUTE AND PIN IN PLACE 06:00 - 13:00 7.00 RIGU P PRE CONTINUE RIG UP OPERATIONS -PLUG IN ELEC INTERCONNECTS-FOR ALL MODULES -CONTINUE RIG UP,RU STAND PIPE AND CEMENT LINES -CONNECT ALL BOPE DECK LINES, -LOWER CELLAR WALLS -ENERGIZE STEM SYSTEM -SWITCH FROM COLD STARTS TO MAIN 3516 GENERATOR POWER. -INSTALL BRIDLE LINES AND SCOPE THE DERRICK. -LAY DOWN BRIDAL LINES -RU KELLY HOSE RIG ACCEPTED AT 13:00 Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 3 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date 6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UW:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 16:00 3.00 RIGU P PRE STAGE BLEED TRAILER NEXT TO TREE AND RU LINES TO THE TREE CAP. -BLEED OFF 1500 PSI OF TRAPPED PRESSURE IN THE TREE. -CONNECT NEW PIT MODULE INTERCONNECT HI PRESSURE MUD LINE -ORGANIZE RIG FLOOR. —SIM OPS—TAKE ON 8.5 PPG SEAWATER TO THE PITS. 16:00 - 18:00 2.00 RIGU P PRE RU CIRCULATION LINES TO TEST TWC -PRESSURE TEST TWC FROM ABOVE AND BELOW. -250 PSI LOW/3500 PSI HIGH.5 MIN CHARTED-GOOD TEST 18:00 - 21:30 3.50 RIGD P PRE NIPPLE DOWN DRY HOLE TREE AND ADAPTER FLANGE PJSM FOR ND -CAMERON REP BLED DOWN HANGER VOID &TERMINATED PORTS ND TREE AND FLANGE TOGETHER PULL OUT THE BACK OF THE CELLAR AND LAY DOWN -CAMERON REP INSTALLED PLUGS IN THE CONTROL LINE PORTS -VERIFY CORRECT CONTROL LINE PORT PLUGS FOR SIZE AND THREAD, -CAMERON INSPECT HANGER THREADS AND MEASURE LDS INDIVIDUALLY FOR FREE MOVEMENT. -3.5"IN,5.5"OUT -MU 7"IJ4S(XO)TO HANGER,THREADS GOOD TAKING 7 TURNS TO MAKE UP BARRIERS FOR ND:CMT PLUG AT 8,718'& KWF. • 21:30 - 00:00 2.50 RIGU P PRE NIPPLE UP 13 5/8"5M BOPE AND RISER SPOOLS -NU 3'&14'HIGH PRESSURE RISER SPOOLS -N/U FLOW LINE,FLOW BOX,CHOKE&KILL LINES 5/13/2014 00:00 - 03:00 3.00 BOPSUR P DECOMP NIPPLE UP 13 5/8"5M BOPE AND RISER SPOOLS -NU 3'&14'HIGH PRESSURE RISER SPOOLS -N/U FLOW LINE,FLOW BOX,CHOKE&KILL LINES 03:00 - 04:30 1.50 BOPSUR P DECOMP RU TEST EQUIPMENT. -BODY TEST BOP,PASS -HOLD RIG EVACUATION DRILL WITH AAR. -AAR: ALL PERSONAL ACCOUNTED FOR. -WAS DISCUSSED THAT THE ALARM IN THE BOILER,PUMP ROOM&THE PITS IS NOT WORKING PROPERLY.THE CREW DID HEAR THE DRILL OVER THE RIG RADIO AND THE HARMONY. -TP SAID THE ELECTRICIAN WILL FIX THE ALARM IN THE MORNING. Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 4 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:30 - 10:00 5.50 BOPSUR P DECOMP TEST 13-5/8"5K,BOPE: -TEST BOPE TO 250 PSI LOW,3,500 PSI HIGH.FOR 5 CHARTED MIN. -TEST WITH 4"&5-1/2"TEST JOINTS -ALL TESTS CHARTED,SEE ATTACHED BOP TEST CHARTS -24 HR NOTIFICATION GIVEN TO THE AOGCC -AOGCC STATE REP.JEFF JONES WAIVED WITNESS ACCUMULATOR DRAW DOWN TEST:SYSTEM PRESSURE 3,050 PSI - PRESSURE AFTER CLOSING ALL RAMS AND ANNULAR PREVENTER 1,550 PSI -RECOVERED 1ST 200 PSI-16 SECONDS, FULL RECOVERY-122 SECONDS - 6 NITROGEN BOTTLES,AVERAGE PRESSURE=1950 PSI CLOSING TIMES -ANNULAR=18 SECONDS -UPPER VBR=16 SECONDS -BLING/SHEARS=18 SECONDS LOWER VBR=16 SECONDS CHOKE HCR=1 SECONDS KILL HCR=1 SECONDS 10:00 - 10:30 0.50 BOPSUR P DECOMP R/D BOPE TEST EQUIPMENT -LAY DOWN TEST JOINT 10:30 - 14:00 3.50 BOPSUR P DECOMP R/U DUTCH RISER SYSTEM -M/U LUBRICATOR&TEST TO 250 PSI LOW/ 3500 HIGH FOR 5 MIN EACH -PULL TWC R/D LUBRICATOR&DUTCH RISER SYSTEM 14:00 - 15:00 1.00 CLEAN P DECOMP CLOSE THE BLIND RAMS AND CIRCULATE THROUGH KILL LINE&OUT IA TO TIGER TANK -CIRCULATE 360 BBLS OF SEAWATER AT 8 BPM,620 PSI -MONITOR WELL FOR 10 MIN,STATIC RECOVERED 160 BBL OF DIESEL 15:00 - 16:30 1.50 CLEAN P DECOMP M/U CROSSOVER AND SCREW INTO TUBING HANGER W/7 TURNS. -BACK OUT LOCK DOWN SCREWS -UNSEAT HANGER WITH 96K -MONITOR WELL FOR 10 MIN,STATIC -L/D HANGER RIG ON HIGHLINE POWER @ 15:30 16:30 - 17:00 0.50 CLEAN P DECOMP CIRCULATE BOTTOMS UP -423 GPM,134 PSI MONITOR WELL FOR 10 MIN,STATIC 17:00 - 22:30 5.50 CLEAN P DECOMP POOH AND LAY DOWN 5 1/2"17# MOD BTC TUBING FROM 3,613 MD TO SURFACE REMOVING ENCAPSULATED CONTROL LINE &CONTROL LINE PROTECTORS RECOVER TOTAL OF 25 CONTROL LINE CLAMPS,25 PINS,4 BANDS,1 OTIS BALL VALVE&1 GLM -TOTAL OF 92 FULL JOINTS PULLED AND LAYED DOWN -CUT JOINT=3.05'ON JOINT#93 Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 5 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:OOAM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. �UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:30 - 00:00 1.50 CLEAN P DECOMP CLEAN&CLEAR RIG FLOOR OF TUBING EQUIPMENT -PU CLEAN OUT BHA TO RIG FLOOR -INSTAL WEAR BUSHING,9.0625" 5/14/2014 00:00 - 00:30 0.50 CLEAN P DECOMP PREP RIG FLOOR TO PU/MU CLEAN OUT BHA -MOBILIZE CLEAN OUT MILLS TO RIG FLOOR 00:30 - 02:30 2.00 CLEAN P DECOMP PU&MU CLEAN OUT BHA:TOTAL 811' -8-1/2"BIT -8 3/8"WATER MELON MILL -(2)8 1/2"WATER MELON MILL -8-3/8"STABILIZER -7-1/4"FLOAT SUB -6-1/2"JARS -(9)6-1/2"DRILL COLLARS (15)JNTS 5"HWDP 02:30 - 08:00 5.50 CLEAN P DECOMP RIH WITH 9-5/8"CLEAN OUT ASSEMBLY F/811' MD TO TOP OF TUBING STUB @ 3,611'MD RIH ON 4" DRILL PIPE DOUBLES FROM THE CASING SHED MONITORING TRIP VIA THE TRIP TANK DISPLACEMENT NUMBERS CORRECT. LOGGED @ 890 FPH FROM 2960'TO 3222', I AND LOGGED @ 100 FPH FROM 3222'TO 3360'. 08:00 - 09:00 1.00 CLEAN P DECOMP CIRCULATE 40 BBL HI VIS SWEEP -12 BPM,900 PSI,35%F/O MONITOR WELL FOR 10 MINUTES:STATIC -POOH TO 3,560'MD 09:00 - 11:30 2.50 CLEAN P DECOMP SLIP AND CUT 600'OF DRILL LINE -HANG BLOCKS -UNHANG BLOCKS -RECALIBRATE MWD,TOTCO&HION BLOCK HEIGHTS MONITOR WELL VIA TRIP TANK 11:30 - 14:00 2.50 CLEAN P DECOMP POOH WITH CLEAN OUT ASSEMBLY F/3,560' T/808'MD -RACK BACK STANDS -MONITOR DISPLACEMENT VIA TRIP TANK- HOLE TAKING CORRECT FILL 14:00 - 15:00 1.00 CLEAN P DECOMP LAY DOWN BHA#1 -RACK BACK DC'S,HWDP AND STRING MILLS. BREAK&LAY DOWN BIT,BIT SUB,XO'S,OIL JAR MONITOR WELL PRIOR TO PULLING BHA THROUGH THE BOPE STACK-WELL STATIC 15:00 - 16:00 1.00 CLEAN P DECOMP DOWNLOADING ARC TOOL 16:00 - 17:30 1.50 DHB N WAIT DECOMP WAIT ON ORDERS -ODE-DISCUSSED OPTIONS AND EZSV SETTING DEPTHS WITH SLB AND GEOLOGISTS. Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 6 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91usft(above Mean Sea Level) Date I From-To Hrs Task j Code I NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 19:00 1.50 DHB P DECOMP MAKE UP BHA#2. 9-5/8"W/EZSV&ARC TOOL,MWD -HOLD PJSM:IDENTIFY NON-SHEARABLES ACROSS THE STACK -PU BHA AS PER SLB AND HALLIBURTON ,REPS 19:00 - 23:00 4.00 DHB P DECOMP RIH W/BHA#2 AND EZSV TO 3,120' � I -PICKING UP SINGLES -SHALLOW TEST MWD Op 1,500' -420 GPM,360 PSI 23:00 - 00:00 1.00 DHB i P I DECOMP MU TDS AND BEGIN LOG W/MWD F/3,120'TO 3,215' -456 GPM,650 PSI 5/15/2014 00:00 - 00:30 0.50 DHB P DECOMP CONTINUE LOG W/MWD F/3,211'TO 3,266' -455 GPM,650 PSI 00:30 - 01:00 0.50 DHB P DECOMP OBTAIN PARAMETERS AND SET EZSV 3,260'AS PER ODE -MONITOR WELL,STATIC 01:00 - 02:00 1.00 DHB P DECOMP POOH F/3,260'TO 80' MONTIOR WELL PRIOR TO NON-SHEARABLES ACROSS STACK STATIC 02:00 - 03:00 1.00 DHB P I I DECOMP ;LAY DOWN BHAAS PER SLB DD I-CHANGE SLIP INSERTS 03:00 - 04:00 1.00 DHB P DECOMP RIG UP TEST 9-5/8"CASING AND EZSV -250 PSI LOW 5 MIN/3,500 PSI HIGH 30 MIN -TEST SUCCESSFUL AS PER BP MIT CRITERIA 04:00 - 04:30 i 0.50 WHIP . P T WEXIT PJSM ON PICKING UP AND HANDLING WHIPSTOCK 04:30 - 06:30 2.00 WHIP P WEXIT PICK UP WHIPSTOCK,BHA AND RIH TO 884' MD 06:30 - 08:30 2.00 WHIP P WEXIT RIH WITH WHIPSTOCK ASSEMBLY ON 4"DP DOUBLES FROM PIPE SHED F/884'MD TO 12,939'MD THEN F/2,939'MD TO 3,128'MD FROM DERRICK -SLOWLY IN AND OUT OF THE SLIPS MONITORING TRIP VIA TRIP TANK 08:30 - 09:30 1.00 WHIP P WEXIT ORIENT WHIPSTOCK AT(3,128'MD)TO 127 I LEFT BY MWD-GRAVITY TOOL FACE -450 GPM,720 PSI -SHUT DOWN PUMPS 1-CONTINUE IN THE HOLE F/3,128'MD, TAGGING 9-5/8"EZSV AT 3,260' EZSV AT 3,260' -SET WHIPSTOCK ANCHOR WITH 20K DOWN i WEIGHT -PULL 10K OVERPULL TO CONFIRM ANCHOR SET -SET DOWN 49K TO SHEAR STARTER MILL FROM WHIPSTOCK -PU TO VERIFY SHEAR TOP OF WINDOW-3,239' -BOTTOM OF WINDOW-3,256' 09:30 - 10:30 1.00 DHB P WEXIT POOH W/2 STDS TO 3,106' PICK UP HES STORM PACKER -RIH AND SET STORM PACKER©90' -PRESSURE TEST RTTS: -250 LOW,3000 HIGH-5/5 CHARTED MIIN- GOOD TEST I-RACK BACK STAND Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 7 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:30 - 17:00 6.50 BOPSUR P WEXIT CHANGE OUT 9-5/8"PACK-OFF -PREP AND INSTALL NEW 9-5/8"PACK OFF -PRESSURE TEST PACK OFF SEALS 250 PSI LOW/5 CHARTED MIN,3500 PSI HIGH FOR 30 CHARTED MIN.-GOOD TEST SET WEAR RING-ID=9-1/16" PACK OFF PULLED WITH 31K OVERPULL OA WAS MONITORED PRIOR TO PACK-OFF CHANGE OUT PER SOP FOR"REPLACING CASING PACK OFF" 17:00 - 17:30 0.50 DHB P WEXIT RETRIEVE STORM PACKER -PICK UP A STAND AND MAKE UP STORM PACKER RUNNING TOOL RIH AND ENGAGE STORM PACKER PER HES !REP ,-RELEASE STORM PACKER,OPEN ANNULAR, POOH AND LD,RUNNING TOOL AND STORM PACKER CHANGE TO BARRIERS:TESTED EZSV,KWM, !TESTED BOPE 17:30 - 18:30 1.00 DISPL P WEXIT DISPLACE WELL FROM 8.5 PPG BRINE TO 9.6 PPG LSND PUMP DISPLACE PER MI DISPLACEMENT 'PLAN -HIGH 40 BBL VIS SPACER AT 169 GPM,160 PSI FOLLOWED BY DISPLACEMENT AT 500 GPM, 900 PSI -MW 9.6 PPG LSND IN/OUT 18:30 - 00:00 5.50 STMILL P WEXIT ,MILL 9-5/8"WINDOWAS PER BAKER REP -MILL F/3,239'MD TO 3,248'MD 11-453 GPM,786 PSI,2-7K WOB -80 RPM, TQ 2-4 K,MW-9.6 PPG PUW-126 K,SOW-114 K TOW=3,239'MD,MOW=3,247.5'MD,BOW= 3,256'MD 5/16/2014 00:00 - 03:30 3.50 STWHIP P WEXIT MILL 9-5/8"WINDOW AS PER BAKER REP -MILL F/3,248'MD TO 3,276'MD -453 GPM,786 PSI,2-7K WOB -80 RPM, TQ 2-4 K,MW-9.6 PPG -PUW 126K,SOW-114K TOW=3,239'MD,MOW=3,247.5'MD,BOW= 3,256'MD -NO CEMENT IN SAMPLES. 03:30 - 04:00 0.50 STWHIP P WEXIT BACK REAM WINDOW -WORK MILLS PAST THE WINDOW X 3 W/ ROTATION AND PUMPS -100 RPM,500 GPM,950 PSI -WORKED PAST WINDOW WITH NO PUMPS AND NO ROTATE X 1 -DRAG DN 1-2K,UP 1-2K -WINDOW SHOWING NO SIGNS OF HANGING UP OR DRAG. Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 8 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/me:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual©83.91usft(above Mean Sea Level) Date From-To Hrs Task I Code NPT NPT Depth Phase Description of Operations (hr) —. (usft) 04:00 - 04:30 0.50 STWHIP P WEXIT RECIPROCATE PIPE F/3,276"MD TO 3,239' MD -CIRCULATE HOLE CLEAN -PUMP 30 BBL SUPER SWEEP -500 GPM.950 PSI,100 RPM,1-2K TQ -MINIMAL CUTTINGS RETURNED AT BOTTOMS UP_ 04:30 - 07:00 2.50 STWHIP P WEXIT RIG UP AND PERFORM LEAK OFF TEST 1-POOH FROM 3,276'MD TO 3,200'MD, 39' INSIDE 9-5/8"CASING -FLOW CHECK WELL 10 MIN WHILE WE RU TEST EQUIPMENT TO PERFORM LOT -MUD WEIGHT:9.6 PPG,-ND=3,237',MD= 3,239',(29')OF NEW HOLE -PUMPED 2.8 BBLS,BLEED BACK.5 BBLS -LOT EMW=11.98 PPG(400 PSI SURFACE PRESSURE) -RECIEVE ATP FROM WTL DESIGNEE -RIG DOWN PRESSURE TESTING EQUIPMENT -MONITORED WELL PRIOR TO POOH.STATIC 07:00 - 08:30 1.50 STWHIP P WEXIT POOH F/3,201'TO 833' -MONITOR WELL,STATIC -CHANGE SLIP INSERTS 08:30 - 10:00 1.50 STWHIP P WEXIT POOH AND LAY DOWN VNNDOW CUTTING BHA AS PER DD AND BOT REPS 10:00 - 10:30 0.50 STWHIP P WEXIT CLEAN AND CLEAR FLOOR 10:30 - 12:00 1.50 STWHIP P WEXIT PULL WEAR BUSHING -MU STACK WASHER AND FLUSH STACK -FUNCTION ALL RAMS CHANGE OUT AIR BOOTS ON RISER -INSTALL WEAR BUSHING 12:00 - 14:30 2.50 STWHIPP WEXIT PJSM W/SLB AND RIG CREW i-PU/MUBHA#4TO755' -SHALLOW TEST POWER DRIVE,400 GPM- 440 PSI 14:30 - 18:00 3.50 STWHIP P WEXIT RIH 755'TO 1,700' -SHALLOW TEST MWD 450 GPM-550 PSI CONT RIH 1,700'TO 3,222' 18:00 - 19:00 1.00 STWHIP P WEXIT PJSM ON GYRO RIG UP -RIG UP GYRO SHEAVES,LINE, AND TOOL. 19:00 - 19:30 0.50 STWHIP P WEXIT OBTAIN SPRS,BASE LINE ECD OF 10.13 PPG -WASH 3,222'TO 3,276' TAG BOTTOM ON DEPTH. -547 GPM,1,700 PSI -SPR t 3,222'W/9.6 PPG MW -#1 MP 20/30 SPM=160/220 PSI -#2 MP 20/30 SPM=160/200 PSI 19:30 - 00:00 4.50 DRILL P INTI DIR DRILL 8-1/2"INTERMEDIATE HOLE F/ 3,276'MD TO 3,409'MD(3405'TVD) -550 GPM,1745 PSI ON,1740 PSI OFF -60 RPM, 3K TQ ON,2K TQ OFF,1K WOB -P/U=115K,S/O=117K,ROT=113 -ART/ADT=3.48 -BIT HRS=3.48,JAR HRS=3.48 -ECD:ACTUAL-10.15 PPG,CALC-10.06 PPG -MW9.61N/9.6OUT NO LOSSES Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 9 of 48 Operation Summary Report Common Well Name.H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 5/17/2014 00:00 - 12:00 12.00 DRILL P INT1 DIR DRILL 8-1/2"INTERMEDIATE HOLE F/ 3,409'MD TO 4,271'MD(4,229'ND) -600 GPM,2000 PSI - 180 RPM, 3K TQ ON,1K TQ OFF,8K WOB I-P/U=127K,S/O=129K,ROT=129K -ART=4.38 HRS,TOT BIT=7.86,JAR HR= 7.86 I-ECD ACT=10.32 PPG ,CALC=10.03 PPG MW9.6IN/9.6OUT -GYRO SURVEY EACH CONNECTION -RIG DOWN AND RELEASE GYRO @ 3,890' -MUD LOSS FOR TOUR=0 BBLS SPR @3,701"MD/3,683'TVD,MW=9.6PPG -MP 1-20/30 SPM=120/180 PSI MP 2-20/30 SPM=125/185 PSI SPR @4,176'MD/4,137'TVD,MW=9.6 PPG -MP1-20/30 SPM=130/180 PSI -MP 2-20/30 SPM=120/180 PSI 12:00 - 00:00 12.00 DRILL P INTI DIR DRILL 8-1/2"INTERMEDIATE HOLE F/ 4,271'MD TO 5,695' (5,404'TVD) 589 GPM,2400 PSI •- 180 RPM, 5K TQ ON,4K TQ OFF,8K WOB i -P/U=152K,S/O=130K,ROT=139K -ART=7.04 HRS,TOT BIT=14.90,JAR HR= 14.90 -ECD ACT=10.25 PPG ,CALC=10.07 PPG MW9.61N/9.6OUT -MUD LOSS FOR TOUR=0 BBLS -24 HR MUD LOSS=0 BBLS SPR @ 4,650"MD/4,586'TVD,MW=9.6 PPG -MP 1-20/30 SPM=180/240 PSI -MP 2-20/30 SPM=170/230 PSI SPR @ 5,125'MD/4,996'TVD,MW=9.6 PPG MP 1-20/30 SPM=220/260 PSI -MP 2-20/30 SPM=220/260 PSI 5/18/2014 00:00 - 07:30 7.50 DRILL P INTI DIR DRILL 8-1/2"INTERMEDIATE HOLE F/ 5,695'MD TO 6,640'MD(6,119'TVD) -590 GPM,2390 PSI -180 RPM, 5-6K TO ON,5K TQ OFF,12K WOB -P/U=154K,S/O=130K,ROT=136K -MW 9.8 IN/9.8 OUT SPR @ 5,695'MD/5,403'ND,MW=9.6 PPG -MP 1-20/30 SPM=210/270 PSI -MP 2-20/30 SPM=200/270 PSI SPR @6,169'MD/5,748'TVD,MW=9.7PPG -MP 1-20/30 SPM=240/300 PSI I f -MP2-20/30 SPM=240/300 PSI SPR @ 6,640'MD/6,116'ND,MW=9.8 PPG -MP 1-20/30 SPM=260/340 PSI -MP2-20/30 SPM=260/340 PSI 0730 - 08:00 0.50 DRILL P INTI RIG SERVICE -TOPDRIVE -BLOCKS Printed 6/23/2014 10:59.44AM North America-ALASKA-BP Page 10 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:0O:OOAM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:00 - 12:00 4.00 DRILL P INTI DIR DRILL 8-1/2"INTERMEDIATE HOLE F/ 6,640'MD TO 7,119'MD(6,535'TVD) -580 GPM,3,075 PSI -180 RPM,9-10K TQ ON,7-9K TQ OFF,8K WOB -P/U=190K,5/O=142K, ROT=155K -ART=7.23 HRS,TOT BIT=22.13,JAR HR= 22.13 -ECD ACT=10.87 PPG ,CALC=10.27 PPG MW 9.8 IN/9.8OUT -MUD LOSS FOR TOUR=0 BBLS SPR @ 7,118'MD/6,530'TVD,MW=9.8 PPG -MP 1-20/30 SPM=260/340 PSI MP 2-20/30 SPM=250/350 PSI 12:00 - 00:00 12.00 DRILL P INTI DIR DRILL 8-1/2"INTERMEDIATE HOLE F/ 7,119'MD TO 7973'MD(7,276'TVD) -500 GPM,3,250 PSI -180 RPM, 7-9K TQ ON,7-8K TQ OFF,8K WOB -P/U=202K,S/O=147K,ROT=166K -ART=7.61 HRS,TOT BIT=29.74,JAR HR= 29.74 -ECD ACT=11.26 PPG ,CALC=11.08 PPG -MW10.6IN/10.6OUT -MUD LOSS FOR TOUR=0 BBLS SPR @ 7,688'MD/7,036'TVD,MW=10.6 PPG MP 1-20/30 SPM=280/340 PSI -MP2-20/30 SPM=280/340 PSI 5/19/2014 00:00 - 01:00 1.00 DRILL P INTI PUMP 30 BBL 40#BBL NUT PLUG LOW VIS- 35 BBL HIGH VIS SWEEP TO CLEAR POSSIBLE MWD TOOL OR BIT NOZZLE PLUG. 300 GPM,1,445'PSI 01:00 - 09:00 8.00 DRILL P INTI DIR DRILL 8-1/2"INTERMEDIATE HOLE F/ 7,973'MD TO 8,257'MD,7,516'TVD -525 GPM,3,350 PSI -180 RPM, 7-9K TQ ON,7-8K TQ OFF,15-20K WOB -ART/ADT=6.6 HRS, TOTAL BIT HRS=36.34, TOTAL JAR HRS=36.34 -ECD ACT=11.47 PPG,CALC=11.07 -MW10.6IN/10.6OUT - @ 8,125'ABLE TO INCREASE FLOW RATE BACK TO 550 GPM,3,350 PSI -PUMP 35 BBL 40#BBL NUT PLUG LOW VIS- 35 BBL HIGH VIS SWEEP TO CLEAR POSSIBLE BIT BALLING. -300 GPM,1,445'PSI 09:00 - 10:00 1.00 DRILL N DFAL INTI MONITOR WELL FOR 10 MINUTES:STATIC -MUD WEIGHT:10.6 PPG IN,10.6 PPG OUT PUMP OUT OF HOLE FROM 8,257'MD TO 7,590'MD -145 GPM,400 PSI,15-30K OVERPULL -PACKING-OFF INDICATIONS AT 7,800'MD, 7,700'MD&7,600'MD 10:00 - 10:30 0.50 DRILL N DFAL INTI POH ON ELEVATORS FROM 7,590'MD TO 7,400'MD -15-30K OVERPULL -INDICATIONS OF SWABBING Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 11 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) 1,-Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project Prudhoe Bay I Site:PB H Pad Rig Name/No.:DOYON 25 I Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor.DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual©83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:30 - 11:00 0.50 DRILL N DFAL INTI PUMP OUT OF HOLE FROM 7,400'MD TO 7,210'MD -500 GPM,3,100 PSI,15-30K OVERPULL -PACKING-OFF INDICATIONS AT 7,250'MD -WIPE ONCE 11:00 - 13:00 2.00 DRILL N DPRB INTI 'MONITOR WELL FOR 10 MINUTES:STATIC -MUD WEIGHT:10.6 PPG IN,10.6 PPG OUT BACKREAM OUT OF HOLE FROM 7,210'MD TO 6,172'MD -CIRCULATE BOTTOMS UP -500 GPM,2,900 PSI MAX,2730 PSI CONTINUOUS -150 RPM,5-7KTORQUE -PULLED 20K OVER PULLING GHOST REAMER THROUGH WINDOW - ECD:ACTUAL-11.32-PPG,CALC-boor-PPG 13:00 - 14:00 1.00 DRILL N DPRB INTI [CIRCULATE BOTTOMS UP F/6,172'MD - ROTATE AND RECIPROCATE PIPE -500 GPM,2636 PSI -150 RMP,5-6K TORQUE 14:00 - 15:30 1.50 DRILL N DPRB INTI BACKREAM OUT OF HOLE FROM 6,172 MD TO 6,123'MD -500 GPM,2880 PSI -150 RPM,12 K TORQUE PULLED 25 K OVER 6,123'MD -LOSS RATE 360 BPH AT 500 GMP RIH FROM 6,123'MD TO 6,350'MD -NOTIFICATIONS MADE 15:30 - 18:00 2.50 DRILL N DPRB 6,123.00 INTI MONITOR WELL,WELL FLOWING. SHUT IN WELL WITH ANNULAR BOP SIDPP=0 PSI,SICP 0 PSI,PIT GAIN=2.5 BBLS -PERFORM EXHALE TEST -LINE UP AND OPEN WELL TO TRIP TANK -MONITOR BLEED BACK -60 MIN=2.63 BBL -SHUT CHOKE AND GET ATP FROM WTL -SIDPP/SICP=0 PSI -OPEN CHOKE,NO FLOW -OPEN BOP AND MONITOR WELL,STATIC. -WORK PIPE TO ENSURE FREE. 18:00 00:00 6.00 DRILL N DPRB INTI PUMP OUT OF HOLE FROM 6,350'MD TO 5,745 MD -150 GPM,410 PSI -6-15K OVERPULL CONT,20K OVERPULL AT 6,123'MD -300 BPH LOSSES TOTAL LOSSES FOR TOUR 936 BBLS 5/20/2014 00:00 - 05:00 5.00 DRILL N DPRB INTI CONTINUE TO PUMP AND BACK REAM OUT OF HOLE F/5,745'TO 5,535' -3.5 BPM,375 PSI,60 RPM,10-16, INTERMITTANT 40K OVERPULL. -WORK THROUGH TIGHT SPOTS AT 5,550'MD AND 5,560'MD AND VARIOUS FLOW RATES AND RPM-NO SUCCESS. -ENCOUNTER TIGHT SPOT AT 5,535'MD, STALLING T/D. -MINIMAL RETURNS -AT 5,525'MD UNABLE TO ROTATE, RECIPROCATE OR CIRCULATE. Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 12 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:00 - 09:00 4.00 DRILL N STUC 5,525.00 INTI JAR DOWN WITH DRILL STRING WEIGHT. -JAR DOWN WITH 0-22K TORQUE,ROCKING PIPE AT 40K. 09:00 - 10:00 1.00 DRILL N STUC 5,525.00 INTI JAR UP WITH 100K OVERPULLS -WORK FROM 100K UP TO 160K OVERPULL AFTER FIRING JARS -P/U IN STAGES TO 310KAND ROCK DRILL STRING WITH TORQUE 10:00 - 10:30 0.50 DRILL N STUC 5,525.00 INTI L/D DOUBLE TO MOVE WEAR POINT IN DRILL LINE -INSPECT AND SERVICE T/D AND DERRICK. -P/U SINGLE FROM THE PIPE SHED 10:30 - 11:00 0.50 DRILL N STUC 5,525.00 INTI JAR DOWN WITH DRILL STRING WEIGHT. -JAR DOWN WITH 0-22K TORQUE,ROCKING PIPE AT 40K. 11:00 - 11:30 0.50 DRILL N STUC 5,525.00 INTI JAR UP WITH 100K OVERPULL -WORKED UP FROM 100K TO 175K OVERPULL AFTER FIRING JARS -P/U IN STAGES TO 325K AND ROCK DRILL STRING WITH TORQUE 11:30 - 12:00 0.50 DRILL N STUC 5,525.00 INTI JAR DOWN WITH DRILL STRING WEIGHT. -CONTINUE TO ATTEMPT TO JAR DOWN WHILE ALTERING TORQUE FROM 0-22K AND ROCKING THE PIPE AT 40K. 12'00 - 13 00 1.00 DRILL N STUC 5,525.00 INTI DROP ACTIVATION BALL TO OPEN WELL COMMANDER -SAW 1800 PSI PRESSURE SPIKE INDICATING POSITIVE SHIFT -DROPPED ISOLATION BALL -BREAK CIRCULATION STAGING PUMPS FROM 7 SPM,153 PSI TO 500 GPM,1,194 PSI -WORKING STRING FROM 150K TO 250K -ESTABLISH CIRCULATION.RETURNS SLOWLY INCREASED UP TO 32%F/O. -DYNAMIC LOSS RATE AT 500 GPM IS 132 BPH 13:00 - 17:00 4.00 DRILL N STUC 5,525.00 INTI WORK DRILL STRING-JAR UP AND DOWN -PULLING UP TO 350K -ATTEMPT TO ROTATE WITH 22K TORQUE- UNSUCCESSFUL 17:00 - 17:30 0.50 DRILL N STUC 5,525.00 INTI DROP SECOND ACTIVATION BALL TO CLOSE WELL COMMANDER -PUMP AT.7 BPM,INCREASING TO 1.5 BPM -BALL ON SEAT 322 STKS. -SAW 1700 PSI PRESSURE SPIKE INDICATING POSITIVE SHIFT -NO RETURNS -CONTINUE TO WORK PIPE FROM 150K TO 250K -ATTEMPTING TO ROTATE WITH 22K TORQUE-UNSUCCESSFUL 17:30 - 23:00 5.50 DRILL N STUC 5,525.00 INTI WORK DRILL STRING-CONTINUE TO JAR UP AND DOWN -ATTEMPT TO ROTATE WITH 22K TORQUE- ALL UNSUCCESSFUL -NO RETURNS -DEVIATION ATP GIVEN BY D&E MGR. Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 13 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:00 - 00:00 1.00 DRILL N STUC 5,525.00 INTI DROP THIRD ACTIVATION BALL TO OPEN WELL COMMANDER -PUMP AT.7 BPM,INCREASING TO 1.5 BPM -BALL ON SEAT 322 STKS. -SAW 1700 PSI PRESSURE SPIKE INDICATING POSITIVE SHIFT -RE-ESTABLISH CIRCULATION THROUGH WELL COMMANDER -DROP SECOND ISOLATION BALL -STAGE PUMPS UP TO 500 GPM,1,067 PSI, 34%F/O 5/21/2014 00:00 - 05:30 5.50 DRILL N STUC 5,525.00 INTI DISPLACE WELL FROM 10.6 PPG TO 9.8 PPG -USING CENTRIFUGE AND H2O AT 50 BPH, 500 GPM,1,125 PSI,37%F/O -SPOTTING E-LINE UNIT,P/U E-LINE AND SHEAVES -WHEN MUD WT REACHED 10.0 PPG, INCREASE IN RETURNS NOTED. 05:30 - 09:00 3.50 DRILL N STUC 5,525.00 INTI SHUT OFF PUMPS TO MONITOR WELL -FLOW EXCEEDED NORMAL 12 BBLS OF DRAIN BACK FROM RIG EQUIPMENT -SHUT IN WELL WITH ANNULAR AND MONITOR PRESSURES EACH MIN -PRESSURE STABILIZED AT SIDPP=110 PSI, SICP=40 -NOTIFICATIONS MADE. -FILL GAS BUSTER,LINE UP RETURNS FROM GAS BUSTER TO TT -WAIT ON ORDERS FROM TOWN 09:00 - 10:30 1.50 DRILL N STUC 5,525.00 INTI RECEIVE ATP FROM WTLTO OPEN WELL AND PERFORM EXHALE TEST -OPEN WELL THRU CHOKE TO TT,MONITOR TIME ELAPSED FOR EACH BBL TO FLOW BACK, 8 BBLS WERE FLOWED BACK- NOTED INCREASING TIME FOR EACH BBL TO FLOW BACK -SHUT WELL IN -CONTINUE TO MONITOR SIDPP AND SICP EACH MINUTE -INITIAL SIDPP=40 PSI,SICP=0 PSI -PRESSURES STABILIZED AT SIDPP=100 PSI,SICP=60 PSI -WAIT ON ORDERS FROM TOWN 10:30 - 13:30 3.00 DRILL N STUC 5,525.00 INTI RECEIVE ATP FROM WTL TO BLEED OFF PRESSURE THRU CHOKE TO TT -OPEN WELL THRU CHOKE TO TT AND MONITOR TIME ELAPSED FOR EACH BBL FLOWED BACK. -CONTINUE TO MONITOR SIDPP AND SICP EACH MINUTE -FLOWED BACK A TOTAL OF 27 BBLS- NOTED INCREASING TIME FOR EACH BBL TO FLOW BACK -PRESSURE ON SIDPP AND SICP WAS ZERO -RECEIVED ATP FROM WTL TO OPEN WELL 13:30 - 14:00 0.50 DRILL N STUC 5,525.00 INTI BREAK CIRCULATION AND STAGE UP PUMPS -STAGE PUMPS UP FROM 1 BPM,107 PSI TO 12 BPM,1,000 PSI,35%F/O CONDITION MUD TO 9.8 PPG IN/OUT Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 14 of 48 Operation Summary Report Common Well Name H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 14:30 0.50 DRILL N STUC 5,525.00 INTI WORK AND ATTEMPT TO JAR PIPE FREE -JARRED UP AND DOWN WHILE APPLYING 22K TORQUE ALL ATTEMPTS UNSUCCESSFUL 14:30 - 16:00 1.50 DRILL N STUC 5,525.00 INTI CIRCULATE AND CONDITION MUD -PREPARE TO PUMP 17 PPG -PUMP 36 BBLS OF 17 PPG AT 30 SPM,90 PSI,18%F/O -CHASE 17 PPG PILL WITH 448 STROKES OF 9.8 PPG MUD -SHUT PUMPS DOWN AND LET PRESSURES EQUALIZE L/D SINGLE IN STRING 16:00 - 16:30 0.50 DRILL N STUC 5,525.00 INTI MONITOR WELL VIA TT -WELL STATIC -R/U BAIL EXTENSIONS P/U TOOLS VIA BEAVER SLIDE 16:30 - 17:30 1.00 DRILL N STUC 5,525.00 INTI HOLD PJSM WITH HALLIBURTON -DISCUSS R/U OF WIRELINE AND THE JET CUTTER -DISCUSS HAZARDS,MITIGATIONS AND CONTINGENCIES 17.30 - 20:30 3.00 FISH N STUC 5,525.00 INTI R/U E-LINE.PRESSURE CONTROL EQUIPMENT AND JET CUTTER -TIW VALVE,PUMP IN SUB,CEMENT LINE AND VALVE,BOTH 4'AND 6'BAIL EXTENSIONS -OTECO CROSSOVER TO HALLIBURTON PACK OFF -SET DRILLSTRING IN SLIPS WITH 120K STRING WEIGHT 20:30 - 23:00 2.50 FISH N STUC 5,525.00 INTI RIH WITH JET CUTTER ON WIRELINE -RIH TO CUT DEPTH AND VERIFY CUT LOCATION -MAKE JET CUT AT 4,747'WIRELINE MD AT 22:00 HOURS -POOH WITH WIRELINE -TOOL SHOWS POSITIVE SIGNS OF FIRING -L/D SAME JET CUTTER TOOL AND ASSEMBLY 23:00 - 00:00 1.00 FISH N STUC 5,525.00 INTI VERIFY DRILL STRING HAS BEEN CUT -LATCH ELEVATORS ON TO STRING AND P/U TO 120K-STRING IS FREE -SET STRING IN SLIPS -R/D PUMP IN SUB AND TIW VALVE 5/22/2014 00:00 - 02:00 2.00 FISH N STUC 5,525.00 INTI M/U TOP DRIVE TO CIRCULATE -STAGE PUMPS UP TO 5 BPM,250 PSI,20% F/O -RECIPROCATE FROM 4,737'MD TO 4,677'MD -ROTATE 20 RPM.1K TORQUE -CIRCULATE TO ESTABLISH 10 PPG IN/OUT -MONITOR WELL FOR 10 MINS-WELL STATIC Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 15 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:00 - 04:00 2.00 FISH N STUC 5,525.00 INTI HOLD PJSM FOR BALANCED CEMENT PLUG WITH SLB REP AND RIG CREW -BLOWDOWN TOP DRIVE AND RIG UP CEMENT HOSE -MONITOR WELL VIA TT -PRESSURE TEST CEMENT LINE -250 PSI LOW FOR 5 CHARTED MIN/4,000 PSI HIGH FOR 5 CHARTED MIN-GOOD TEST -BLOWDOWN CEMENT LINE TO TRUCK AND CIRCULATE 04:00 - 05:00 1.00 FISH N STUC 5,525.00 INTI SLB CEMENTERS BATCH 16.5 PPG CEMENT -RECIPROCATE FROM 4,740'MD TO 4,726'MD -210 GPM,277 PSI,20%F/O 05:00 - 06:30 1.50 FISH N STUC 5,525.00 INTI PUMP AND DISPLACE BALANCED CEMENT PLUG WITH SLB CEMENTERS. -PUMP 58 BBLS 12 PPG MUDPUSH @ 4BPM, 315 PSI -PUMP 59 BBLS 16.5 PPG CEMENT @ 4-3 BPM 173 PSI -PUMP 11 BBLS 12 PPG MUDPUSH @ 3 BPM, 175 PSI -PUMP 22 BBLS 10.0 PPG MUD @ 3 BPM,40 PSI -PUMP 6 BBL 10.0 PPG MUD @ 2 BPM,36 PSI. -CEMENT AND SPACER CONTAINED 2#BBL CEMNET -CEMENT IN PLACE AT 05:35 -LOST 23 BBLS AFTER CEMENT LEFT DRILL PIPE -PULL 7 STANDS AT 4 MIN/STAND AND THEN PULLED 4 MORE STANDS TO 3,771'MD -LOST 36 BBLS IN ONE HOUR WHILE PULLING STANDS 06:30 - 09:30 3.00 FISH N STUC 5,525.00 INTI CLEAN CEMENT FROM DRILL PIPE. -PUMP 28 BBLS NUT PLUG -CIRCULATE NUT PLUG AT 2 BPM,110 PSI, 10%F/O -DROP WIPER BALL#1 -PUMP 27 BBLS NUT PLUG AT 2 BPM,110 PSI, 10%F/O -DROP WIPER BALL#2 AND DISPLACE WITH 40 BBLS OF MUD -INITIAL DLR=15 BPM,FINAL DLR=4 BPM -SIMOPS:MIX 80 PPB PILL AND CLEAN OUT CEMENT VALVES -MONITOR WELL TO DETERMINE STATIC LOSS RATE-WELL IS STATIC 09:30 - 10:30 1.00 FISH N STUC 5,525.00 INTI POOH FROM 3,803'MD TO INSIDE THE SHOE AT 2,963'MD -MONITOR WELL VIA TT 10:30 - 12:30 2.00 FISH N STUC 5,525.00 INTI HANG BLOCKS AND SLIP AND CUT 48'OF DRILLING LINE -UNHANG BLOCKS,CALIBRATE MWD,TOTCO AND AMPHION BLOCK HEIGHT -MONITOR WELL VIA TT 12:30 - 13:30 1.00 FISH N STUC 5,525.00 INTI RIH FROM 2,963'MD TO 4,080'MD -MONITOR WELL VIA TT -HOLE GIVING BACK CALCULATED DISPLACEMENT VOLUME Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 16 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UW:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:30 - 14:00 0.50 FISH N STUC 5,525.00 INTI SPOT 41 BBLS OF 80 PPB LCM PILL -PER OCN#3 -CIRCULATE AT 30 SPM,170 PSI,17%F/O -SPOT LCM TO BOTTOM OF DP WITH 417 STROKES -LCM PACKING OFF MUD MANIFOLD BLEEDER AND MANUAL PRESSURE GAUGES ON MUD PUMPS-MOST LIKELY DUE TO LOW PUMP RATE 14:00 - 16:30 2.50 FISH N STUC 5,525.00 INTI LAY IN 41 BBLS OF 80 PPB LCM PILL -PUMP OUT OF HOLE FROM 4,080'MD TO 3,511'MD -PULLED 30 FPM,WHILE PUMPING AT 2 BPM, 157 PSI,6%F/O -LAY PILL OUTSIDE OF DRILL STRING -PULL TWO MORE STANDS ON ELEVATORS TO 3,320'MD -PUMP 40 BBLS MUD AT 2 BPM TO CLEAR DRILL PIPE -FLUID LOSS=6 BBLS MONITOR WELL-U-TUBING OUT OF DRILL PIPE 16:30 - 17:30 1.00 FISH N STUC 5,525.00 INTI STAGE PUMPS UP TO DRILLING RATE AND CIRCULATE -110 SPM,462 GPM.540 PSI,36%F/O - CIRCULATE 2700 STROKES,1.5 BU WITH NO LOSSES -LCM AND CEMNET RETURNED TO SURFACE. -MONITOR WELL-STATIC -DRAIN TOP DRIVE INTO STUMP,UNABLE TO BLEED DOWN THROUGH BLEEDER -REVERSE BLOWDOWN TOP DRIVE FROM MANIFOLD,STILL UNABLE TO BLOW THROUGH BLEEDERS 17:30 - 19:30 2.00 1 FISH N STUC 5,525.00 INTI POOH ON ELEVATORS FROM 3,511'MD -LAY DOWN GHOST REAMER -PULLED A TOTAL OF 50 STANDS PLUS CUT JOINT -CUT JOINT=19.15'.CLEAN CUT. -TOP OF FISH AT 4,761'MD -WELL TAKING CALCULATED HOLE FILL 19:30 - 20:00 0.50 FISH N STUC 5,525.00 INTI CLEAN AND CLEAR RIG FLOOR -LAY DOWN 19.15'CUT JOINT -BREAK FOSV FROM SHEAR JOINT 20:00 - 21:30 1.50 FISH N STUC 5,525.00 INTI MAKE UP STACK WASHER -WASH BOP STACK -PULL WEAR RING 21:30 - 00:00 2.50 BOPSUR P 5,525.00 INTI RIG UP FOR BOPE TEST PICK UP 4"TEST JOINT,INSTALL TEST PLUG,FLOW WITH H2O -MAKE UP FLOOR VALVES -SIMOPS:REMOVE FLOWMASTER BLEEDER VALVE,FLUSH MUD MANIFOLD AND BLEEDER WITH H20,RE-INSTALL BLEEDER VALVE AND BLOWDOWN TOP DRIVE -PERFORM FULL BODY TEST WITH 4"TEST JOINT-GOOD TEST Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 17 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task 1 Code NPT NPT Depth Phase Description of Operations ' (hr) (usft) 5/23/2014 00:00 - 04:00 4.00 BOPSUR P INTI j TEST 13-5/8"5K,BOPE,CONT. I-TEST BOPE TO 250 PSI LOW,3,500 PSI i iJ HIGH.FOR 5 CHARTED MIN. -TEST WITH 4"TEST JOINT. -ALL TESTS CHARTED,SEE ATTACHED BOP TEST CHART-NO FAILURES I -24 HR NOTIFICATION GIVEN TO THE AOGCC -AOGCC STATE REP.BOB NOBLE WAIVED WITNESS !ACCUMULATOR DRAW DOWN TEST:SYSTEM PRESSURE 3,000 PSI ( PRESSURE AFTER CLOSING ALL RAMS AND ANNULAR PREVENTER 1,775 PSI I-RECOVERED 1ST 200 PSI-35 SECONDS, FULL RECOVERY-129 SECONDS 6 NITROGEN BOTTLES,AVERAGE PRESSURE=1950 PSI CLOSING TIMES I I-ANNULAR=23 SECONDS 1-UPPER VBR=18 SECONDS -BLING/SHEARS=16 SECONDS -LOWER VBR=16 SECONDS CHOKE HCR=2 SECONDS -KILL HCR=2 SECONDS 04:00 - 05:00 1.00 FISH P 5,525.00 ,I W INTI !RIG DON BOPE TESTING EQUIPMENT i -CLEAN AND CLEAR RIG FLOOR I _ I 1-PULL WEAR BUSHING 05:00 - 07:30 2.50 FISH N i STUC 5,525.00 INTI :MOBILIZE 8-1/2"INTERMEDIATE BHA#5 -HOLD PJSM VVITH SLB REPS AND CREW ISI-MAKE UP 8-1/2"INTERMEDIATE BHAAS PER 'SLB DD REP TO 196'MD I -MONITOR DISPLACEMENT VIA TT 07:30 - 09:00 1.50 1 FISH N STUC 5,525.00 INTI PICK UP 5"HWDP I -PICK UP 17 JTS OF 5"HWDP AND 6-1/2" JARS 1-RIH TO 196'MD TO 756' MD -MONITOR DISPLACEMENT VIA TT 09:00 - 10:00 i 1.00 FISH N STUC 1 5,525.00 INTI RIH FROM 756'MD TO 1,515'MD CHANGE OUT PS-21 SLIP INSERTS AND RIH _ -MONITOR DISPLACEMENT VIA TI- 10:00 - 10:30 0.50 FISH N � STUC 1 5,525.00 INTI 1 SHALLOW HOLE TEST MWD TOOLS 450 GPM,895 PSI,38%F/O-GOOD TEST 10:30 - 12:00 1.50 FISH N STUC 5,525.00 INTI RIH ON 4"DP -RIH FROM 1,515'MD TO 3,223'MD -MONITOR DISPLACEMENT VIA TT 12:00 - 13:00 1.00 FISH N STUC 5,525.00 INTI WASH DOWN FROM 3,223'MD TO 3,313'MD -STAGE PUMPS UP TO 575 GPM,1,710 PSI, 40%F/O 1 -NO LOSSES FOR 30 MINUTES,3500 i 1STROKES -SPR'S AT 3,330'MD/3,297'ND,MW=9.9 PPG: j MP 1-20/30 SPM=220/280 PSI MP 2-20/30 SPM=240/300 PSI 1-RACK BACK STAND#27 -MONITOR WELL-STATIC Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 18 of 48 Operation Summary Report Common Well Name H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) • Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:8/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual©83.91usft(above Mean Sea Level) Date From-To Hrs Task Code NPT , NPT Depth Phase Description of Operations (hr) (usft) � 13:00 - 14:00 1.00 FISH I N STUC - 5,525.00 INTI 1 PEFORM FIT TO 11.0 PPG 1-FLUID PACK LINES AND PERFORM FIT TO 11.0 PPG EMW MW=9.9 PPG IN/OUT -PRESSURE UP TO 190 PSI,LEAK-OFF TO 110 PSI IN 15 MIN(5 PSI/MIN) -TEST APPROVED BY ODE 14:00 - 14:30 0.50 FISH N STUC 5,525.00 INTI 'WASH DOWN FROM 3,223'MD TO 3,420'MD -40 RPM,500 GPM,1,410 PSI,37%F/O -INSTALL GHOST REAMER IN STAND#28 14:30 - 18:30 4.00 FISH N STUC 5,525.00 INTI REAM DOWN FROM 3,420'MD LOOKING FOR TOC -500 GPM,1,371 PSI,38%F/O -SAW 3K TORQUE AND 165 PSI DIFFERENTIALAT 4,184'MD 18:30 - 19:30 1.00 STKOH N STUC 5,525.00 i INTI :ATTEMPT TO KICK OFF CEMENT PLUG REAM AND SLACK OFF TO TRY AND INITIATE SIDETRACK DOWN TO 4,330'MD -UNSUCCESSFUL-NO COMPETENT CEMENT FOUND -POOH TO 4,082'MD TO BEGIN OPEN HOLE .SIDETRACK 19:30 - 21:30 2.00 STKOH N STUC 5,525.00 INTI _BEGIN TROUGHING FOR OH SIDETRACK -TROUGH FROM 4,023'MD TO 4,082'MD AT 160 DEG TFO -574 GPM,1,700 PSI,40%F/O -40 RPM,2K TORQUE -GOOD INDICATIONS OF SUCCESSFUL SIDETRACK NO DYNAMIC LOSSES NOTED NEW REPORT CREATED FOR H-19C PB1 21:30 - 00:00 2.50 DRILL N STUC 5,525.00 INTI DRILLING AHEAD IN 8-1/2"HOLE INTERVAL DRILL FROM 4,083'MD TO 4,222'MD/4,183' TVD -459 GPM,1,260 PSI,35%F/O -40 RPM,3K TORQUE,3K WOB -ECD=10.02 PPG -OFF BOTTOM=1,200 PSI • -P/U=128K,S/O=127K,ROT=127K, • TORQUE=2K AST=1.12,ART=.47,ADT=1.59, • -TOTAL BIT HRS=1.59,TOTAL JARS=1.59 5/24/2014 00:00 - 00:30 ' 0.50 DRILL N STUC 5,525.00 INTI DRILL AHEAD IN 8-1/2"HOLE INTERVAL -DRILL FROM 4,222'MD TO 4,272'MD/4,232' •TVD -459 GPM,1,260 PSI,36%F/O 40 RPM,3K TORQUE,3K WOB ECD=10.05 -OFF BOTTOM=1,200 PSI P/U=128K,S/O=126K,ROT=127K, TORQUE=2K • • AT 00:50 20 GALLONS HYDRAULIC OIL SPILL ON RIG FLOOR WHILE PERFORMING PM,NO FLUID ESCAPED SECONDARY CONTAINMENT -THE OIL WAS CLEANED UP AND PROPERLY DISPOSED OF. INCIDENT IS STILL UNDER INVESTIGATION. TRACTION #:2014-IR-4724055 Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 19 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 00:30 - 02:30 2.00 DRILL N STUC 5,525.00 INTI BACKREAM OUT OF HOLE FROM 4,272'MD TO 4,177'MD -POOH ON ELEVATORS TO 4,050'MD. -ORIENT HIGHSIDE AND RIH TO 4,177'MD, OBTAIN SURVEYS CONFIRMING IN OLD HOLE -POOH TO 4,070'MD,ORIENT 180 DEG LOWSIDE AND RIH TO 4,177'MD. OBTAIN SURVEY CONFIRMING IN NEW HOLE -BACK REAM OUT OF HOLE TO 4,070'MD AND REPEAT,RIH ORIENTATED 0°DEG HIGHSIDE TO 4,177'MD. -OBTAIN SURVERY CONFIRMING IN NEW HOLE 02:30 - 12:00 9.50 DRILL N STUC 5,525.00 INTI DRILL AHEAD IN 8-1/2"HOLE INTERVAL -DRILL FROM 4,272'MD TO 4,880'MD/4,788' TVD -577 GPM,2,030 PSI,39%F/O -40 RPM,5K TORQUE,7K WOB -ECD=10.17 -OFF BOTTOM=1,860 PSI -P/U=138K,S/O=131K,ROT=135K, TORQUE=3K AST=3.0,ART=1.74,ADT=4.74, -TOTAL BIT HRS=6.34,TOTAL JARS=6.34 -PUMPED 35 BBL LO/HI VIS SWEEP#1 AT 4,471'MD,06:00 HRS -PUMPED 35 BBL LO/HI VIS SWEEP#2 AT 4,861'MD,11:30 HRS -SPR'S AT 4,367'MD/4,320'TVD,MW=9.6 PPG,04:00 HRS: MP 1-20/30 SPM=170/220 PSI MP 2-20/30 SPM=160/220 PSI -SPR'S AT 4,841'MD/4,755'TVD,MW=9.6 PPG, 11:15 HRS: MP 1-20/30 SPM=180/240 PSI MP 2-20/30 SPM=180/240 PSI Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 20 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) ' Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time: 1/9/1983 12:00:00AM :Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual©83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (usft) •12:00 - 00:00 12.00 DRILL N STUC 5,525.00 INTI •DRILL AHEAD IN 8-1/2"HOLE INTERVAL -DRILL FROM 4,880'MD TO 5,790'MD/5,468' TVD -581 GPM,2,215 PSI,40%F/O -40 RPM,7K TORQUE,6K WOB -ECD=10.15 -OFF BOTTOM=2,090 PSI P/U=149K,S/O=130K,ROT=137K, TORQUE=4-5K AST=3.21,ART=3.08,ADT=6.29, -TOTAL BIT HRS=12.86,TOTAL JARS=12.86 -PUMPED 35 BBL LO/HI VIS SWEEP#3 AT 5,225'MD,18:00 HRS-SAW 45%INCREASE IN FINES -PUMPED 35 BBL LO/HI VIS SWEEP#4 AT 5,600'MD,23:30 HRS -SPR'S AT 4,367'MD/4,320'TVD,MW=9.6 PPG, 18:40 HRS: MP 1-20/30 SPM=220/270 PSI MP2-20/30 SPM=220/270 PSI 5/25/2014 00:00 - 10:00 10.00 DRILL N STUC 5,525.00 INTI DRILL AHEAD IN 8-1/2"HOLE INTERVAL -DRILL FROM 5,790'MD TO 6,664'MD/6,077' ITVD -581 GPM,2,680 PSI,40%F/0 -80 RPM,7K TORQUE,11K WOB -ECD=10.52 -OFF BOTTOM=2,450 PSI P/U=166K,S/O=133K,ROT=140K, TORQUE=5K -BEGAN WEIGHTING UP MUD TO 10.1 AT 6,650'MD -REDUCED RPM TO 25 AFTER GHOST REAMER ENTERED OPEN HOLE,HAVING DIFFICULTY WITH SLIDES -PUMPED 35 BBL LO/HI VIS SWEEP#5 AT 6,100'MD,02:40 HRS -PUMPED 35 BBL LO/HI VIS SWEEP#6 AT 6,475'MD,07:40 HRS -SPR'S AT 6,074'MD/5,661'ND,MW=9.7 PPG,02:22 HRS: MP 1-20/30 SPM=250/310 PSI MP 2-20/30 SPM=240/310 PSI 10:00 - 10:30 0.50 DRILL P 5,525.00 INTI GREASE SWIVEL PACKING AND CHANGE OUT TOPDRIVE MCWS COMM BATTERY Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 21 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:30 - 12:00 1.50 r DRILL N STUC 5,525.00 INTI DRILL AHEAD IN 8-1/2"HOLE INTERVAL -DRILL FROM 6,664'MD TO 6,740'MD/6,162' TVD 1-581 GPM,2,770 PSI,40%F/0 -100 RPM,7K TORQUE,8K WOB -ECD=10.93 I-OFF BOTTOM=2,510 PSI P/U=170K,S/O=136K,ROT=145K, TORQUE=5K -AST=2.07,ART=4.07,ADT=6.14 H.TOTAL BIT HRS=19.0,TOTAL JARS=19.0 ' I SPR'S AT 6,664'MD/6,077'TVD,MW=9.95 'PPG,10:10 HRS: MP 1-20/30 SPM=250/320 PSI MP 2-20/30 SPM=240/310 PSI 12:00 - 13:30 1.50 DRILL N STUC 5,525.00 INTI DRILL AHEAD IN 8-1/2"HOLE INTERVAL -DRILL FROM 6,670'MD TO 6,765'MD/6,182' TVD -581 GPM,2,775 PSI,40%F/0 -100 RPM,7K TORQUE,6K WOB -ECD=10.87 -OFF BOTTOM=2,675 PSI -P/U=170K,S/O=136K,ROT=145K, TORQUE=5K 13:30 - 14:30 1.00 DRILL N STUC 5,525.00 INTI CIRCULATE AND CHANGE OUT SWAB AND LINER -288 GPM,840 PSI,26%F/O -CHANGE OUT SWAB AND LINER ON MP#1, CYLINDER#1 14:30 - 00'00 9.50 DRILL N STUC 5,525.00 INTI DRILL AHEAD IN 8-1/2"HOLE INTERVAL -DRILL FROM 6,765'MD TO 7,119'MD/6,475' TVD -581 GPM,2,825 PSI,40%F/O -100 RPM,8K TORQUE,7K WOB -ECD=10.59 -OFF BOTTOM=2,575 PSI -P/U=171K,S/O=138K,ROT=150K, TORQUE=6K -AST=3.96,ART=1.77,ADT=5.73 -TOTAL BIT HRS=24.73,TOTAL JARS=24.73 -PUMPED 35 BBL LO/HI VIS SWEEP#7 AT 6,834'MD,18:00 HRS-20%INCREASE IN FINES,HELPED WITH SLIDING Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 22 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 I Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual 183.91 usft(above Mean Sea Level) Date From-To Hrs Task I Code NPT NPT Depth Phase Description of Operations (hr) l (usft) — 1 5/26/2014 00:00 - 12:00 12.00 DRILL N STUC 8,257.00 INTI DRILL AHEAD IN 8-1/2"HOLE INTERVAL -DRILL FROM 7,119'MD TO 7,835'MD/7,096' TVD -578 GPM,3,800 PSI,40%F/O -100 RPM,8K TORQUE,11K WOB -ECD=11.45 -OFF BOTTOM=3,100 PSI P/U=193K,S/O=146K,ROT=166K, TORQUE=7K -AST=3.48,ART=4.14,ADT=7.62 -TOTAL BIT HRS=31.48,TOTAL JARS=31.48 -WORKED GHOST REAMER THROUGH KOP AND TWO COAL SEAMS TWICE -PUMPED 35 BBL LO/HI VIS SWEEP#8 AT 7,214'MD,01:20 HRS -PUMPED 35 BBL LO/HI VIS SWEEP#9 AT 7,610'MD,08:25 HRS- NO NOTICABLE INCREASE IN CUTTINGS -INCREASE MUD WEIGHT FROM 10.1 PPG TO 10.6 PPG AT 7,640'MD. -TOP OF HRZ FORMATION CAME IN AT 7,748' MD. -SPR'S AT 7,119'MD/6,457'TVD,MW=10.1 PPG MP 1-20/30 SPM=250/320 PSI MP 2-20/30 SPM=250/320 PSI -SPR'S AT 7,784'MD/7,054'TVD,MW=10.6 PPG MP1-20/30 SPM=300/390 PSI MP 2-20/30 SPM=300/390 PSI 12:00 - 18:30 6.50 DRILL N STUC 8,257.00 j INTI DRILL AHEAD IN 8-1/2"HOLE INTERVAL -DRILL FROM 7,835'MD TO 8,211'MD/7,396' TVD -551 GPM,3,152 PSI,40%F/O -100 RPM,7K TORQUE,7K WOB ECD=11.51 -OFF BOTTOM=3,020PSI -P/U=198K,S/O=148K,ROT=167K, TORQUE=7K PUMPED 35 BBL LO/HI VIS SWEEP#10 AT 8,068'MD,15:45 HRS-SAW 35%IN FINES AND CLAYS 18:30 - 19:00 0.50 DRILL P 8,257.00 INTI INSPECT AND SERVICE TOP DRIVE 19:00 - 20:30 1.50 DRILL N RREP 8,211.00 INTI INSPECT AND REPAIR ELECTRICAL CABLE ON TOP DRIVE ENERGY TRACK -RACK BACK STAND#79 AND CIRCULATE DURING REPAIRS -20 SPM,434 PSI,RECIPROCATE FROM 8,167' MD TO 8,100'MD -UPON COMPLETION OF REPAIR RIH TO 8,211'MD. Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 23 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 21:30 1.00 DRILL N STUC 8,257.00 INTI DRILL AHEAD IN 8-1/2"HOLE INTERVAL -DRILL FROM 8,211'MD TO 8,257'MD/7,449' TVD -551 GPM,3,200 PSI,40%F/O -100 RPM,7-8K TORQUE,10K WOB -ECD=11.53 -OFF BOTTOM=3,045 PSI -P/U=200K,S/O=148K,ROT=170K, TORQUE=6-7K -OFF STUCK PIPE NPT AT 21:30 HRS 05-26-2014 21:30 - 00:00 2.50 DRILL P INTI DRILL AHEAD IN 8-1/2"HOLE INTERVAL -DRILL FROM 8,257'MD TO 8,353'MD/7,528' TVD -551 GPM,3,200 PSI,40%F/O -100 RPM,7-8K TORQUE,10K WOB -ECD=11.53 -OFF BOTTOM=3,045 PSI -P/U=200K,S/O=148K, ROT=170K, TORQUE=6-7K -AST=.56,ART=5.39,ADT=5.95 -TOTAL BIT HRS=37.53,TOTAL JARS=37.53 -SPR'S AT 8,258'MD/7,448'TVD,MW=10.6 PPG MP 1-20/30 SPM=330/420 PSI MP 2-20/30 SPM=340/430 PSI 5/27/2014 00:00 - 01:00 1.00 DRILL 1 P INTI DRILL AHEAD IN 8-1/2"HOLE INTERVAL -DRILL FROM 8,353'MD TO 8,448'MD/7,609' TVD -546 GPM,3,400 PSI,40%F/O -100 RPM,8K TORQUE,12K WOB -ECD=11.58 -OFF BOTTOM=3,150 PSI -P/U=202K,S/O=146K,ROT=165K, TORQUE=7K 01:00 - 05:00 4.00 DRILL N SFAL 8,488.00 INTI CIRCULATE AND CHANGE OUT SWABS AND LINERS -PUMPED 35 BBL LO/HI VIS SWEEP#11 AT 8,448'MD,01:30 HRS -CHANGE OUT#2 SWAB AND LINER ON MP #1 -CIRCULATE AND RECIPROCATE FROM 8,350' MD TO 8,418'MD. -126-340 GPM,490-1375 PSI,21%F/O -60 RPM,7K TORQUE -SWAP PUMPS TO MP#1,INCREASE CIRCULATING RATE -337 GPM,1,430 PSI,21%F/O -CHANGE OUT ALL 3 SWABS AND LINERS ON MP#2 Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 24 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual©83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:00 - 12:00 7.00 DRILL P INTI DRILL AHEAD IN 8-1/2"HOLE INTERVAL -DRILL FROM 8,448'MD TO 8,740'MD/7,855' TVD -551 GPM,3,520 PSI,40%F/O I-100 RPM,10K TORQUE,12K WOB -ECD=11.55 -OFF BOTTOM=3,100 PSI -P/U=216K,S/O=150K,ROT=174K, TORQUE=9K -AST=1.44,ART=2.69,ADT=4.13 -TOTAL BIT HRS=41.68,TOTAL JARS HRS= 41.68 -PUMPED 35 BBL LO/HI VIS SWEEP#12 AT 8,650'MD,10:30 HRS -SPR'S AT 8,734'MD/7,848'TVD,MW=10.6 PPG MP 1-20/30 SPM=340/430 PSI MP2-20/30 SPM=340/430 PSI 12:00 - 00:00 12.00 DRILL P INTI DRILL AHEAD IN 8-1/2"HOLE INTERVAL -DRILL FROM 8,740'MD TO 9,303'MD/8,335' TVD 551 GPM,3,380 PSI,40%F/O -100 RPM,9-11K TORQUE,10K WOB -ECD=11.25 -OFF BOTTOM=3,155 PSI -P/U=229K,S/O=154K, ROT=179K, TORQUE=8K -AST=3.37,ART=3.76,ADT=7.13 -TOTAL BIT HRS=48.81,TOTAL JARS HRS= 48.81 -PUMPED 35 BBL LO/HI VIS SWEEP#13 AT 9,026'MD,17:00 HRS-SAW 30%INCREASE IN FINES -PUMPED 35 BBL LO/HI VIS SWEEP#14 AT 9,218'MD,22:30 HRS-SAW 40%INCREASE IN FINES -SPR'S AT 9,113'MD/8,164'TVD,MW=10.6 PPG MP 1-20/30 SPM=330/420 PSI MP2-20/30 SPM=310/410 PSI Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 25 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 5/28/2014 00:00 - 10:00 10.00 DRILL P INTI DRILL AHEAD IN 8-1/2"HOLE INTERVAL -DRILL FROM 9,303'MD TO 9,704'MD/8,669' TVD -551 GPM,3,380 PSI,40%F/O -40 RPM,10K TORQUE,10K WOB -PUMPED 35 BBL LO/HI VIS SWEEP#15 AT 9,493'MD,04:00 HRS -PUMPED 35 BBL LO/HI VIS SWEEP#16 AT 9,620'MD,09:05 HRS —BOTTOMS UP LAG AT 99.14%OF CALCULATED. -ECD=11.36 -OFF BOTTOM=3,220 PSI -P/U=237K,S/O=181K,ROT=179K, TORQUE=8K -MW 10.6 PPG IN/OUT -AST=3.22,ART=2.79,ADT=6.01 -TOTAL BIT HRS=54.82,TOTAL JARS HRS= 54.82 10:00 - 12:00 2.00 DRILL P INTI CIRCULATE BOTTOMS UP TO EVAULUATE FORMATION SAMPLES. -NO SAG SAND OBSERVED IN SAMPLES. -ROTATE AND RECIPROCATE FROM 9,678' MD TO 9,704'MD -551 GPM,3,160 PSI,40%F/O -100 RPM,10-11K TORQUE -TOTAL STROKES=10,300 -PUMPED 35 BBL LO/HI VIS SWEEP#15 AT 9,493'MD,04:00 HRS,30%INCREASE. -PUMPED 35 BBL LO/HI VIS SWEEP#16 AT 9,620'MD,09:05 HRS,20%INCREASE. -SPR'S AT 9,709'MD/8,671'TVD,MW=10.6 PPG MP 1-20/30 SPM=340/430 PSI MP 2-20/30 SPM=330/420 PSI 12:00 - 13:00 1.00 DRILL P INTI DRILL 5 FT AND CIRCULATE BOTTOMS UP FOR FORMATION SAMPLE. -DRILL FROM 9,704'MD TO 9,709'MD/8,671' TVD -NO SAG SAND OBSERVED IN SAMPLES. -551 GPM,3,300 PSI,40%F/O -40 RPM,10K TORQUE,10K WOB -CIRCULATE BOTTOMS UP TO EVALUATE SAMPLES -ROTATE AND RECIPROCATE FROM 9,679' MD TO 9,709'MD -551 GPM,3,125 PSI,40%F/O -100 RPM,10K TORQUE -MW IN/OUT=10.6 PPG -TOTAL STROKES=10,012 MONITOR WELL-STATIC Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 26 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:OOAM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:I-1-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 15:00 2.00 DRILL P INTI DRILL 5 FT AND CIRCULATE BOTTOMS UP FOR FORMATION SAMPLE. -DRILL FROM 9,709'MD TO 9,714'MD/8,675' TVD -SAG SAND WITH GLAUCONITE IN SAMPLES. 551 GPM,3,110 PSI,40%F/O -40 RPM,10K TORQUE,10K WOB -CIRCULATE BOTTOMS UP X2 TO EVALUATE SAMPLES -ROTATE AND RECIPROCATE FROM 9,679' MD TO 9,709'MD -551 GPM,3,125 PSI,40%F/O -100 RPM,10K TORQUE -MW IN/OUT=10.6 PPG -FINAL ECD=11.15 -TOTAL STROKES=13,060 -GEO CALLED INTERMEDIATE HOLE SECTION TD AT 9,714'MD/8,675'TVD -MONITOR WELL-STATIC -AST=0.00,ART=0.05,ADT=0.05 -TOTAL BIT HRS=54.87,TOTAL JARS HRS= 54.87 15:00 - 18:30 3.50 DRILL P INTI PUMP OUT OF THE HOLE ABOVE THE HRZ -PUMP OUT OF HOLE FROM 9,714'MD TO 7,692'MD -2 BPM,260 PSI,15%F/O -P/U=240K,5/0=155K,ROT=179K, TORQUE=11K -TIGHT SPOT AT 9,025'MD-PULLED 50K OVER -RAN THROUGH AND WIPED CLEAN -NO OTHER TIGHT SPOTS ENCOUNTERED. -MONITOR WELL VIA PITS#1,2,3 -WELL TAKING CALCULATED PIPE DISPLACEMENT VOLUME -MW IN/OUT=10.6 PPG 18:30 - 20:30 2.00 DRILL P INTI POOH ON ELEVATORS FROM 7,692'MD TO 6,640'MD. -STOP AT 9,658'MD TO PUMP SURVEY -SAW 10K OVERPULL WHEN PULLING GHOST REAMER THROUGH WINDOW -HOLE WAS SLICK,NO OVERPULL ENCOUNTERED -MONITOR WELL ON TRIP TANK -WELL TAKING CALCULATED PIPE DISPLACEMENT VOLUME Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 27 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:OOAM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UW:500292088300 Active datum:H-19C Actual©83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 21:30 1.00 DRILL P INTI CIRCULATE BOTTOMS UP X2 -ROTATE AND RECIPROCATE PIPE FROM 6,458'MD TO 6,640'MD. -550 GPM,2,450 PSI,39%F/O -80 RPM,6K TORQUE -P/U=170K,S/O=133 -MW IN/OUT=10.6 PPG ECD=11.15 -HOLE UNLOADED AT 2000 STROKES INTO THE BOTTOMS UP. 100%INCREASE IN CUTTINGS RETURNS. MONITOR WELL-STATIC 21:30 - 00:00 2.50 DRILL P INTI RIH ON ELEVATORS FROM 6,458'MD TO 9,187' MD -MONITOR WELL VIA TRIP TANK -PUSHING MUD AWAY AT 50 FPM,SLOWED TRIP SPEED TO 30 FPM. -TOTAL MUD LOST WHILE TRIPPING IN-16 BBLS -SPR'S AT 9,714'MD/8,675'TVD,MW=10.6 PPG MP 1-20/30 SPM=250/320 PSI MP 2-20/30 SPM=260/330 PSI 5/29/2014 00:00 - 01:00 1.00 DRILL P INTI RIH ON ELEVATORS FROM 9,212'MD TO 9,592' MD -SAFETY REAM FROM 9,592'MD TO 9,687'MD STAGING PUMPS UP -252 GPM,1,180 PSI,24%F/O -20 RPM,8K TORQUE -WASH DOWN FROM 9,687'MD TO TD AT 9,714'MD -126 GPM,550 PSI,19%F/O Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 28 of 48 Operation Summary Report Common Well Name.H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:OOAM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:00 - 04:00 3.00 DRILL P INTI CIRCULATE AND CONDITION HOLE -CIRCULATE BOTTOMS UP -RECIPROCATE AND ROTATE FROM 9,616' MD TO 9,714'MD -551 GPM,3340,40%F/O -100 RPM,10K TORQUE -INITIAL ECD=11.52,FINAL ECD=11.12 -TOTAL STROKES=6,550 -PUMPED 35 BBL LO/HI VIS SWEEP#17 AT 9,714'MD,01:40 HRS-SAW 30%INCREASE IN CUTTINGS -551 GPM,3340,40%F/O -100 RPM,10K TORQUE CIRCULATE BOTTOMS UP -RECIPROCATE AND ROTATE FROM 9,616' MD TO 9,714'MD -551 GPM,3340,40%F/O -100 RPM,10K TORQUE -P/U=240K,S/O=155K,ROT=179K, TORQUE=11K SPR'S AT 9,678'MD/8,645'TVD,MW=10.75 'PPG MP 1-20/30 SPM=290/390 PSI MP 2-20/30 SPM=290/390 PSI -MONITOR WELL-STATIC 04:00 - 07:00 3.00 DRILL P INTI PUMP OUT OF THE HOLE ABOVE THE HRZ -PUMP OUT OF HOLE FROM 9,585'MD TO 7,597"MD -2 BPM,260 PSI,10%F/O,AT 30 FTM -P/U=250K,S/O=149K,ROT=180K, TORQUE=9K 07:00 - 08:30 1.50 DRILL P INTI POOH ON ELEVATORS FROM 7,597'MD TO 5,700' -HOLE WAS SLICK,NO OVERPULL ENCOUNTERED -MONITOR WELL ON TRIP TANK -WELL TAKING CALCULATED PIPE DISPLACEMENT VOLUME 08:30 - 09:00 0.50 DRILL P INTI CIRCULATE BOTTOMS UP -WITH GHOST REAMER INSIDE THE WINDOW CBU X 1 -ROTATE AND RECIPROCATE PIPE F/5,700' TO 5,604 -550 GPM,ICP-2440 PSI,FCP-2380 PSI,40 RPM,4-5K TQ -SAWA 30%INCREASE IN CUTTINGS RETURN AT BOTTOMS UP. -B/D TOP DRIVE 09:00 - 10:30 1.50 DRILL P INTI POOH ON ELEVATORS FROM 5,604"MD TO 4,150' -MONITORING TRIP VIA THE TRIP TANK -WELL TAKING CALCULATED PIPE DISPLACEMENT VOLUME -NO TIGHT SPOTS ENCOUNTERED-HOLE IS SLICK Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 29 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual©83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:30 - 12:00 1.50 DRILL P INTI I CHECK FOR SIDETRACK ENTRY I BACK REAM OUT OF THE HOLE FROM 4,150' MD TO 4,000'MD -BACK REAMING UP PAST KICK OFF POINT AT 4,083'MD -500 GPM,1700 PSI,40 RPM,1-2K TQ -MW-10.6 PPG IN/OUT ORIENT TOOL FACE HIGHSIDE: -W/NO PUMPS ON RIH TO 4,185'MD,OBTAIN SURVEY TO VERIFY CORRECT WELLBORE WAS ENTERED. -REPEAT SAME OPERATION IN NEW HOLE FOR VERIFICATION. -KOPAT4083' 12:00 - 13:00 1.00 DRILL P INTI I POOH ON ELEVATORS FROM 4,000'MD TO 3,408'MD -MONITOR TRIP VIA THE TRIP TANK -WELL TAKING CALCULATED PIPE DISPLACEMENT VOLUME NO TIGHT SPOTS ENCOUNTERED-HOLE IS SLICK -LAY DOWN GHOST REAMER 13:00 - 13:30 0.50 DRILL P INTI CIRCULATE BOTTOMS UP ROTATE AND RECIPROCATE PIPE FROM 3.408 TO 3,314' -547 GPM,1760 PSI,60 RPM,1K TQ -DROP 2.38"RABBIT W/135'OF WIRE 13:30 - 15:00 1.50 DRILL P INTI POOH ON ELEVATORS F/3,314'MD TO 851' -MONITOR TRIP VIA THE TRIP TANK -WELL TAKING CALCULATED PIPE DISPLACEMENT VOLUME 15:00 - 16:00 1.00 DRILL P 1 INTI MONITOR WELL BEFORE PULLING BHA THROUGH BOP -WELL STATIC -PREP RIG FLOOR FOR LD BHA#5 -FUNCTION TEST LOWER VBR'S 16:00 20:00 4.00 DRILL P INTI LD BHA#5 -STAND BACK HWDP FOR 7"LINER RUN LD JARS,XO'S AND 8-1/2"BIT -RECOVER 2.38"RABBIT WITH WIRE TAIL - BIT GRADE 1-1-CT-A-X-I-ER-TD -BIT AND STABILIZERS ALL IN GAUGE -FUNCTION TEST BLIND SHEAR RAMS 20:00 - 20:30 0.50 DRILL P INTI CLEAN AND CLEAR RIG FLOOR -LOWER TOOLS DOWN THE BEAVER SLIDE 20:30 22:30 2.00 CASING P INTI CHANGE OUT UPPER PIPE RAMS TO 7"RAMS -PULL WEAR BUSHING AND INSTALL TEST PLUG 1-TEST 7"RAMS W/7"TEST JOINT TO 250 PSI LOW/3,500 PSI HIGH,5/5 CHARTED MINUTES. -FUNCTION TEST ANNULAR. -RIG DOWN TEST EQUIPMENT -DRAIN THE STACK 22.30 00:00 1.50 CASING P INTI MAKE UP 7"LINER HANGER/PACKER ASSEMBLY -PICK UP"A"JOINT AND MAKE UP HANGER/ PACKER ASSY,MAKE UP SINGLE JOINT OF 5" HWDP TO THE TOP OF THE LINER/HANGER ASSY MIX AND POUR PAL MIX AND RACK BACK IN DERRICK 105' Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 30 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) ( Start Date:5/10/2014 End Date:6/8/2014 iX3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time: 1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) —5/30/2014 00:00 - 02:30 2.50 CASING P INTI FINISH RIGGING UP LINER HANGER/PACKER ASSEMBLY AND RACK BACK -RU VOLANT CASING RUNNING TOOL WITH 4' BAIL EXTENSIONS -VERIFY CORRECT CASING TONG HEAD DIES -INSPECT ELEVATORS AND VERIFY CORRECT NUMBERS. -VERIFY 7"VT BY 4-1/2"IF(XO)FOR TIW. -INSTALL PAL MIX 02:30 - 03:00 0.50 CASING P INTI HOLD PJSM FOR RUNNING 7"INTERMEDIATE LINER -DISCUSS RUN HAZARDS AND WELL CONTROL WITH DDI,SUPERVISORS AND CREWS,BP WSL,BOT 03 00 - 09'30 6.50 CASING P INTI PICK UP 7"SHOE TRACK,CHECK FLOATS AND RIH WITH 7"INT LINER - MAKE UP AND BAKERLOK SHOE TRACK -RIH WITH 3 JT'S 7",26# VTHC LINER TO 128' ,MD,CHECK FLOATS-GOOD -RUN 7",26#LINER FROM 128'TO 1,792'MD AS PER LINER RUNNING TALLY -TORQUE TURN TO 11,950 FT/LBS -FILL ON FLY AND FILL PIPE WITH VOLANT EVERY 10 JTS. -RIH AT50FPM -MW=10.6 PPG I N/OUT MONITOR WELL VIA PIT TANKS#2 AND#3 09:30 - 10:00 0.50 CASING P INTI HOLD WELL CONTROL DRILL WITH AAR -GOOD DISCUSSIONS REGARDING WELL !CONTROL PROCEDURES WHILE RUNNING 7" LINER AND HAVING VOLANT TOOL RIGGED UP 10:00 - 11:00 1.00 CASING N SFAL 9,714.00 INTI -CODE 8 RIG REPAIR -CHANGE OUT POWER TONGS -TOUBLESHOOT TONGS AND DECIDE TO CHANGE THEM OUT ADJUST RIG HYDRAULIC UNIT -RIG UP BACKUP POWER TONGS 11:00 - 13:30 2.50 CASING P INTI RIH WITH 7",26#VTHC LINER -RUN 7",26#LINER FROM 1,792'MD'TO 3,224' MD AS PER LINER RUNNING TALLY -TORQUE TURN TO 11,950 FT/LBS -FILL ON FLY AND FILL PIPE WITH VOLANT EVERY 10 JTS. -RIH AT50FPM -MW=10.6 PPG IN/OUT -MONITOR WELL VIA PIT TANKS#2 AND#3 13:30 - 14:00 0.50 CASING P INTI CIRCULATE 1.5 BOTTOMS UP ABOVE WHIPSTOCK -STAGE PUMPS UP TO 5 BPM,211 GPM -ICP=160 PSI,FCP=337 PSI,20%F/O -P/U=112K,S/O=110K -TOTAL STROKES PUMPED=1,261 -MW=10.6 PPG IN/OUT 1-MONITOR WELL VIA PIT TANKS#2 AND#3 Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 31 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 19:30 5.50 CASING P INTI RIH WITH 7",26#VTHC LINER -RUN 7",26#LINER FROM 3,224'MD'TO 5,514' MD AS PER LINER RUNNING TALLY -TORQUE TURN TO 11,950 FT/LBS FILL ON FLY CIRCULATE EVERY 5TH JOINT FOR 5 MIN -3 BPM,127 GPM,320 PSI,18%F/O RIH AT 50 FPM -MW=10.6 PPG IN/OUT -MONITOR WELL VIA PIT TANKS#2 AND#3 19:30 - 22:00 2.50 CASING P INTI RIH WITH 7",26#VTHC LINER -RUN 7",26#LINER FROM 5,514'MD'TO 6,642' MD AS PER LINER RUNNING TALLY TORQUE TURN TO 11,950 FT/LBS -FILL ON FLY -CIRCULATE EVERY 10TH JOINT FOR 5 MIN -3 BPM,127 GPM,370 PSI,18%F/O -RIH AT 30 FPM -MW=10.6 PPG IN/OUT -PUSHED AWAY A TOTAL OF 25 BBLS WHILE RIH WITH 7",26#LINER -MONITOR WELL VIA PIT TANKS#2 AND#3 22:00 - 22:30 0.50 CASING P INTI RIG DOWN VOLANT TOOL AND 7"ELEVATORS -L/D VOLANT TOOL AND REMOVE 4'BAIL EXTENSIONS -REMOVE 7"ELEVATORS AND PICK UP 5" ELEVATORS 22:30 - 23:00 0.50 CASING P INTI PICK UP 7"LINER HANGER ASSEMBLY FROM DERRICK -PICK UP LINER HANGER AND PACKER WITH 7",26#VTHC JOINT AAND 1 JT 5"HWDP -C/O PS-21 SLIP INSERTS -P/U=208K,S/O=147K 23:00 - 23:30 0.50 CASING P INTI TIH WITH 5"HWDP FROM 6,685'MD TO 7,242' MD -P/U=260K,S/0=171K -MW=10.6 PPG IN/OUT -MONITOR HOLE VIA TT 23:30 - 00:00 0.50 CASING P INTI RIG UP TO RIH WITH 4"DP -CHANGE 5"ELEVATORS TO 4"ELEVATORS -INSTALL CROSSOVER FROM 4-1/2"IF TO 4-1/2"XT-39 -CHANGE OUT PS-21 SLIP INSERTS 5/31/2014 00:00 - 01:00 1.00 CASING P INTI RIH ON 4"DP FROM 7,242'MD TO TOP OF HRZ AND ATTEMPT TO CIRCULATE AT 7,550' MD -FILLING PIPE EVERY 5 STANDS -AVERAGE RUNNING SPEED 30 FPM -STAGE PUMPS UP FROM 1 BPM TO 5 BPM -NO RETURNS AT ANY FLOW RATE -LOST 164 BBLS WHILE PUMPING -SHUT DOWN PUMPS TO MONITOR WELL- STATIC Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 32 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:00 - 03:00 2.00 CASING P INTI RIH WITH 4"DP FROM 7,550'MD TO 9,705'MD. - AVERAGE RUNNING SPEED 30 FPM -FILLING PIPE EVERY 5 STANDS -WASH DOWN LAST 30'OF STAND#26 AT 2 BPM,485 PSI LOSTATOTAL OF 80 BBLS WHILE RIH ON DP 03:00 - 03:30 0.50 CASING P INTI PICK UP CEMENT HEAD -RIG UP SNUB LINE TO CEMENT HEAD -CLOSE UPPER TIWAND VERIFY CEMENT LINE CONNECTIONS -MONITOR WELL-STATIC 03:30 - 04:00 0.50 CASING P INTI RIH AND TAG 7"INT HOLE TD -WASH DOWN THE LAST 30'TO BOTTOM -1 BPM,380 PSI,WITH MINIMAL RETURNS -TAG 8.5'IN ON 4"SINGLE BELOW CEMENT HEAD -S/O 10K ON BOTTOM TO CONFIRM ON BOTTOM -PICK UP TO 300K-NEUTRAL WEIGHT 04:00 - 06:00 2.00 CASING P INTI ESTABLISH CIRCULATION AND CONDITION MUD FOR CEMENT JOB -STAGE PUMPS UP FROM 1 BPM TO 5.5 BPM -LOSSES RANGING FROM 156 BPH AT 2.5 BPM TO 240 BPH AT 5.5 BPM -CONTACTED ODE -DECISION WAS MADE TO PUMP A 40 PPB DRILL AHEAD PILL 06:00 - 08:30 2.50 CASING P INTI PUMP 30 BBL40 PPB LCM PILL -PUMP AT 4 BPM,520 PSI,6%FO,130 BPH LOSS RATE -WITH PILLAT THE SHOE REDUCE RATE TO -2 BPM,300 PSI,1%F/O-LOSS RATE AT 22 BPH, -4 BPM,500 PSI,14%F/O-LOSS RATE-46 BPH -5 BPM,620 PSI,16%F/O-LOSS RATE-82 BPH -418 BBLS PUMPED 146 BBLS LOST Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 33 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual 183.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:30 - 11:30 3.00 CASING P INTI 'PERFORM EXHALE TEST -SHUT DOWN PUMPS AFTER PUMPING LCM PILL WELL STILL FLOWING AFTER 6 MIN AND CALCULATED DRAIN BACK ! SHUT THE WELL IN WITH ANNULAR PREVENTER TO A CLOSED CHOKE. -MONITORED PRESSURES FOR STABILIZATION(30 MIN),FILL GAS BUSTER SIDPP=100 PSI ,SICP=40 PSI 1-MAKE PROPER LEVEL-0 NOTIFICATIONS 1-PERFORM EXHALE TEST. -BLEED BACK 6 BBLS THROUGH THE CHOKE TAKING RETURNS TO THE TRIP TANK -1 BBL IN 2:11 MIN,LAST BBL BLEED BACK TIME 2:30 MIN SHUT IN WELL FOR 15 MIN. SIDP:120 PSI,SICP:35 PSI MAKE NOTIFICATIONS BLEED BACK 10 BBLS -1 BBL IN 3:20 MIN,LAST BBL BLEED BACK TIME 6:37 MIN -RECEIVED AUTHORIZATION TO PROCEED AND OPEN WELL FROM WTL •-WILL TEST ANNULAR PREVENTER DURING FULL BOPE TEST ON 6/1 -MONITOR WELL DURING CEMENTING PJSM 11:30 - 12:30 1.00 CEMT P INTI PRESSURE TEST CEMENT LINES W/ PRESSURE CROSS CHECK VERIFICATION. -PJSM WITH SLB AND DDI RIG CREW. -250 PSI LOW,5000 PSI HIGH TEST FOR 5 CHARTED MIN. -TEST SLB PUMP TRIPS-GOOD 12:30 - 14:00 1.50 CEMT P INTI LINE UP ON RIG PUMPS TO ESTABLISH CIRCULATION RATES -STAGE PUMPS UP FROM 1 BPM TO 6 BPM -1 BPM,250 PSI,1%F/O—NO LOSSES ON 1 TO 4 BPM -2 BPM,320 PSI,12%F/O -3 BPM,415 PSI,18%F/O 4 BPM,505 PSI,19%F/O -5 BPM,610 PSI,21%F/O,60 BPH LOSS RATE -6 BPM,770 PSI,23%F/O,75 BPH LOSS RATE 14:00 - 14:30 0.50 CEMT P INTI HOLD PJSM FOR CEMENTING 7"INT LINER -HOLD PJSM WITH SLB CEMENTERS, RIG CREW,DDI TP AND BP WSLAND BAKER REP. -REDUCE CIRCULATION RATE TO 4 BPM,445 PSI,21%F/O WHILE CONDUCTING PJSM I-BEGIN TO BATCH 15.8 PPG CEMENT Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 34 of 48 f0174,7Operation Summary Report fi Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual©83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:30 16:00 1.50 CEMT P INTI CEMENT 7"INTERMEDIATE LINER. -PUMP CEMENT PER SLB CEMCADE. 1-PUMP 30 BBLS OF 12.0 PPG MUD PUSH I SPACER AT 5 BPM,ICP=530 PSI,FCP=450 PSI,20%F/O -PUMP 47.1 BBLS OF 15.8 PPG CLASS G TAIL CEMENT AT 5 BPM,ICP=430 PSI,FCP=180 PSI,20%F/O(EXCESS VOLUME 30%FOR OH) -LAUNCH DRILL PIPE WIPER DART -CHASE DRILL PIPE WIPER DART WITH 10 BBLS OF WATER AT 5 BPM,70 PSI,18%F/O TRANSFER TO RIG PUMPS -PUMP 16 BBLS OF 10.6 PPG LSND MUD AT 6 BPM,125 PSI,18%F/O -CATCH FLUID AT 152 STROKES,PRESSURE INCREASED TO 330 PSI DECREASE PUMP RATE TO 3 BPM -WIPER DART LATCHED AT 196 STROKES, PRESSURE INCREASED TO 915 PSI I-INCREASE PUMP RATE TO 6 BPM,ICP=450 PSI,FCP=625 PSI,21%F/O -AT 2,146 STROKES DECREASE PUMP RATE I TO 4 BPM,ICP=380 PSI,FCP=900 PSI DECREASE PUMP RATE AT 2,592 STROKES TO 2 BPM,ICP=700 PSI,FCP=775 PSS 16% F/O -BUMP PLUG AT 2,689 STROKES -CEMENT IN PLACE AT 15:45. -LOST 1 BBL AFTER CEMENT LEFT SHOE. 16:00 - 16:30 0.50 CASING P INTI SET 7"LINER HANGER AND PACKER AS PER BOT REP -PRESSURED UP TO 2,200 PSI AND S/O 79K I TO SET HANGER I-INCREASED PRESSURE UP TO 4,200 PSI TO SET PACKER AND SHEAR HR. -CHECK FLOAT EQUIPMENT-GOOD P/U 6'AND ROTATE AT 20 RPM AND SHEAR I DOG SUB. 16:30 - 17:00 0.50 CEMT P INTI RIG DOWN BAKER CEMENT HEAD BREAKDOWN BAKER CEMENT HEAD AND RIG DOWN CEMENT HOSE -LAY DOWN CEMENT HEAD 17 00 - 17:30 0.50 CEMT P INTI I CIRCULATE BOTTOMS UP -CIRCULATE AT 15 BPM,1,071 PSI,43%F/O -TOTAL STROKES=2,334 17.30 - 18:30 1.00 CEMT P INTI 1 POOH WITH LINER RUNNING TOOL ON 4"DP RACKING BACK POOH FROM 3,057'MD TO 590'MD -MONITOR DISPLACEMENT VIA TT 1-MONITOR WELL AT 685'MD-STATIC -CHANGE OUT SLIP INSERTS TO HAND SLIP INSERTS 18:30 - 19:30 1.00 CEMT P INTI POOH FROM 590'MD TO 44'MD. I-LAY DOWN 5"HWDP ONE BY ONE TO PIPE SHED -MONITOR DISPLACEMENT VIA TT Printed 6/23/2014 10:59.44AM North America-ALASKA-BP Page 35 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:30 - 20:30 1.00 CEMT P INTI LAY DOWN 7"LINER RUNNING TOOL -LAY DOWN HRD-E LINER RUNNING TOOL AS PER BOT REP FROM 44'MD -P/U BAKER CEMENT HEAD FROM PIPE SHED,RIG DOWN 3 CROSSOVER'S,4"XT 39 SINGLE,10'4"PUP JT -PICK UP SHEAR JOINT AND REMOVE CROSSOVER AND XT 39 FLOOR VALVE 20:30 - 22:00 1.50 CEMT P INTI CHANGE OUT UPPER RAMS -HOLD PJSM -DRAIN STACK,CLOSE BLINDS AND BLEED PRESSURE FROM ACCUMULATOR -CHANGE OUT UPPER RAMS FROM 7"TO 2-7/8"X 5-1/2"VBR'S -SIMOPS:MAKE UP XT 39 AND 3-1/2"IF SAFETY VALVES FOR PRESSURE TESTING 22:00 - 00:00 2.00 BOPSUR P INTI BOPE TEST -TEST BOPE TO 250 PSI LOW,3,500 PSI HIGH FOR 5 CHARTED MIN -TEST WITH 4"AND 4-1/2"TEST JOINTS -ALL TESTS CHARTED,SEE ATTACHED BOP TEST CHARTS -24 HR NOTIFICATION GIVEN TO THE AOGCC TEST WAIVED BY AOGCC REP JOHN CRISP 6/1/2014 00:00 - 04:00 4.00 BOPSUR P INTI BOPE TEST -TEST BOPE TO 250 PSI LOW,3,500 PSI HIGH FOR 5 CHARTED MIN -TEST WITH 4"AND 4-1/2"TEST JOINTS -ALL TESTS CHARTED,SEE ATTACHED BOP TEST CHART -NO TEST FAILURES. -24 HR NOTIFICATION GIVEN TO THE AOGCC -TEST WAIVED BY AOGCC REP JOHN CRISP ACCUMULATOR DRAW DOWN TEST:SYSTEM PRESSURE =3,000 PSI,MANIFOLD PRESSURE=1,500 PSI - PRESSURE AFTER CLOSING ALL RAMS AND ANNULAR PREVENTER 1,700 PSI -RECOVERED 1ST 200 PSI-23 SECONDS WITH 2 ELECTRIC PUMPS,FULL RECOVERY- 121 SECONDS - 6 NITROGEN BOTTLES,AVERAGE PRESSURE=2,050 PSI CLOSING TIMES -ANNULAR=23 SECONDS -UPPER VBR=17 SECONDS -BLING/SHEARS=17 SECONDS -LOWER VBR=18 SECONDS -CHOKE HCR=2 SECONDS -KILL HCR=2 SECONDS 04:00 - 05:00 1.00 BOPSUR P INTI RIG DOWN BOPE TEST EQUIPMENT -BACK OUT LOCKDOWN SCREWS -PULL TEST PLUG -INSTALL WEAR RING-VERIFY ID AT 9-1/16" -RUN IN LOCKDOWN SCREWS -TORQUE ALL GLAND NUTS CLEAN AND CLEAR RIG FLOOR Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 36 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor.DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) _ Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:00 - 06:00 1.00 CASING P INT1 MOBILIZE PRODUCTION BHA#6 -LOWER PUP JOINTS AND CEMENT HEAD DOWN THROUGH BEAVER SLIDE I-MOBILIZE BHA COMPONENTS TO RIG FLOOR AND PIPE SHED 06:00 - 08:30 2.50 CASING P INTI PICK UP6-1/8"PRODUCTION BHA#6 -HOLD PJSM -PICK UP 4.75"ARCHER W/MICROSCOPE, IMPULSE AND ADN PER SLB DD -SURFACE TEST ARCHER TOOL AT 200 GPM, 725 PSI-GOOD TEST -LOAD R/A SOURCE IN ADN TOOL -MAKE UP BHA TO 211'MD -CHANGE OUT SLIP INSERTS TO 4" -MONITOR WELL DISPLACEMENT VIA TT 08:30 - 10:00 1.50 CASING P INTI RIH ON 4"DOUBLES FROM PIPE SHED FROM 211'MD TO 1,500'MD. -SHALLOW HOLE TEST MWD AT 200 GPM, I 980 PSI,20%F/O-GOOD TEST -MONITOR WELL DISPLACEMENT VIA TT -MW-10.6 PPG LSND IN/OUT 10:00 - 12:00 2.00 CASING P INTI RIH ON 4"DOUBLES FROM PIPE SHED FROM 1.500'MD TO 4,186'MD. -FILL PIPE EVERY 2000' -MONITOR WELL DISPLACEMENT VIA TT -DID NOT SEE THE LINER TOP AT 3,072' 12:00 - 13:30 1.50 CASING P I INTI CUT AND SLIP DRILLING LINE -HANGE BLOCKS CUT AND SLIP 96'DRILLING LINE -SIMOPS:COMPLETE PM'S ON ON TOPDRIVE -MONITOR WELL VIA TT 13:30 - 15:00 1.50 CASING , P INTI CHANGE OUT XT 39 SAVER SUB ON TOPDRIVE -CALIBRATE AMPHION AND TOTCO SYSTEMS -MONITOR WELL VIA TT 15:00 - 19:00 4.00 CASING P INTI RIH WITH 4"DP OUT OF THE DERRICK FROM 4.186'MD TO 9,406'MD -FILL PIPE EVERY 20 STANDS -MONITOR WELL DISPLACEMENT VIA PIT#2 -MW-10.6 PPG IN/OUT 19:00 - 20:30 1.50 CASING P INTI PERFORM 7"LINER PRESSURE TEST -RIG UP PRESSURE TEST EQUIPMENT. -TEST CASING TO 250 PSI LOW-5 MIN/3,500 PSI HIGH FOR 30 MIN-GOOD TEST -5 BBLS PUMPED TO REACH PRESSURE AND 5 BBLS BLED BACK -RECIEVED AUTHORIZATION TO PROCEEDE FROM WiL RIG DOWN TEST EQUIPMENT. -MONITOR WELL VIA PIT#2 Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 37 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type.RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. I UVN:500292088300 Active datum:H-19C Actual©83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 22:30 2.00 CASING P INTI DISPLACE MUD FROM 10.6 PPG LSND TO 8.6 PPG SOLIDS FREE FLO-PRO -ROTATE AND RECIPROCATE FROM 9.406' MD TO 9,499'MD -PUMP 30 BBL STEEL LUBE PILL -85 GPM,586 PSI,14%F/O -50 RPM,9K TORQUE OFF BOTTOM PUMP 40 BBLS HI VIS SPACER --85 GPM,805 PSI,10%F/O -50 RPM,9K TORQUE -CHASE PILLS AND DISPLACE WELL TO 8.5 PPG FLO PRO -230 GPM,1,657 PSI,26%F/O -50 RPM,4K TORQUE -TOTAL STROKES PUMPED=5,526 -P/U=195K,S/O=158K,ROT=179K SPR'S AT 9,494'MD/8,494'TVD,MW=8.6 PPG ' MP 1-20/30 SPM=400/560 PSI MP 2-20/30 SPM=380/560 PSI 22:30 - 23:30 1.00 CASING P INTI PERFORM NEGATIVE PRESSURE TEST ON 7" LINER LAP. -MONITOR WELL FOR 30 MIN WITH 8.6 PPG MUD -NO GAINS IN TRIP TANK-GOOD TEST -NOTIFY WTLAND RECEIVE AUTHORIZATION TO PROCEED -WASH&REAM IN THE HOLE FROM 9,499' MD TO 9,455' -232 GPM,1450 PSI,40 RPM,4K TQ, -P/U=195K,S/O=158K,ROT=179K 23:30 - 00:00 0.50 CASING P INTI DRILL OUT SHOE TRACK -TAG CEMENT ON TOP OF PLUGS AT 9,544' MD -DRILL OUT PLUGS&CEMENT WITH 4-5K WOB -232 GPM,1,456 PSI,21%F/O -40 RPM,5K TORQUE -P/U=195K,S/O=158K,ROT=179K 6/2/2014 00:00 03:30 3.50 DRILL P INTI WASH AND REAM LANDING COLLAR/SHOE TRACK -240 GPM,1,470 PSI,40 RPM,4-6K TORQUE, 23%F/O BY DRILLING TALLY DEPTHS -TAG LANDING COLLAR AT 9,627'MD. -TAG FLOAT COLLAR AT 9,669'MD -DRILL FLOAT SHOE F/9,712'TO 9,714'MD -235 GPM,1500 PSI,5-8 K WOB 6-8K TQ DOWN LINK TO ARCHER TOOL. 03 30 - 04:00 0.50 DRILL P PROD1 -DRILL 20'OF NEW FORMATION F/9,714'TO 9,734' -250 GPM,1670 PSI,100 RPM,9-11K TQ -MW-8.6 PPG IN/OUT Printed 6/23/2014 10:59.44AM North America-ALASKA-BP Page 38 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:00 - 05:00 1.00 DRILL P PROD1 CIRCULATE BOTTOMS UP PRIOR TO FIT. -250 GPM,1655 PSI,60 RPM, - RECIPROCATE FULL STAND. -SHUT DOWN WITH 8.6 PPG IN/OUT -BOTTOMS UP SAMPLES SHOWED CEMENT, SLIGHT TRACES OF SAND. -NO LOSSES -8.6 PPG MW,IN/OUT MONITOR WELL FOR 10 MIN-WELL STATIC • 05:00 - 07:00 2.00 DRILL P PROD1 PERFORM FIT TEST AT 9,714'MD/8,676'TVD ✓ -PULL UP INTO THE 7"CASING SHOE -R/U EQUIPMENT TO PERFORM FIT TEST -R/U CHART RECORDER,SWING,TEE, SENSATOR -FLUID PACK SENSATOR LINE -CHECK TOTCO RECORDER AND ENSURE WORKING PROPERLY -FLUID PACK TUBING AND KILL LINE -PRESSURE UP TO 450 PSI,PRESSURE STABILIZED AT 435 PSI FOR 10 CHARTED MIN -ATP RECEIVED FROM ODE WITH EMW=9.5 PPG GIVING INFINITE KICK TOLERANCE -RIG DOWN FIT TEST EQUIPMENT,PREPARE TO DRILL AHEAD IN 6-1/8"PRODUCTION _INTERVAL 07:00 - 07:30 0.50 DRILL P PROD1 DRILL 6'PRODUCTION BUILD SECTION FROM 9,734'MD TO 9,750'MD. -249 GPM,1,630 PSI,22%F/O,100 RPM,12K TQ,8K WOB -PU=195K,S/O=153K -8.6 PPG MW IN/OUT 07:30 - 08:30 1.00 DRILL P PROD1 PULL UP INSIDE THE 7"SHOE TO 9,686'MD -SAFETY STOP MOMENT. REMOVE ICE BUILD UP IN THE DERRICK. 08:30 - 12:00 3.50 DRILL P PROD1 DRILL 6-1/8"PRODUCTION BUILD SECTION F/ 9,750"MD TO 9,878'MD,8,791'TVD -250 GPM,1660 PSI ON BTM,1650'PSI OFF BTM,22%F/O -140 RPM,9-11 KTORQUE,5-8 K WOB -PU=199K,S/O=157K,ROT=180K, -ACTUAL ROTATE TIME=3.01 HRS -TOTAL BIT HRS=3.01 -TOTAL JAR HRS=3.01 -MW IN=8.6+PPG,MW OUT=8.6+PPG -SURVEYS EVERY 30' -FINGERPRINT CONNECTIONS WITH NORMAL 12 BBL DRAIN BACK. -SPR'S AT 9,734'MD/8,692'TVD,MW=8.6 PPG MP 1-20/30 SPM=350/530 PSI MP 2-20/30 SPM=340/530 PSI Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 39 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 'X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time: 1/9/1983 12:00:00AM I Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (usft) 12:00 - 00:00 12.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION BUILD SECTION F/ 9,878"MD TO 10,530'MD,8,878'TVD -249 GPM,1,700 PSI ON BTM,1,698 PSI OFF BTM,22%F/O -140 RPM,10 K TORQUE,3-6 K WOB -PU=197K,5/0=156K,ROT=173K, -ACTUAL ROTATE TIME=6.22 HRS -TOTAL BIT HRS=9.23 -TOTAL JAR HRS=9.23 -MW IN=8.6+PPG,MW OUT=8.6+PPG -SURVEYS EVERY 30' -FINGERPRINT CONNECTIONS WITH NORMAL 12 BBL DRAIN BACK. -SPR'S AT 10,163'MD/8,895'TVD,MW=8.6 ,PPG ' MP 1-20/30 SPM=380/580 PSI MP 2-20/30 SPM=420/600 PSI 6/3/2014 00.00 - 06:00 6.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION BUILD SECTION F/ 10,531'MD TO 10,990'MD,8,778'MD -250 GPM,1750 PSI ON BTM,1720'PSI OFF BTM,22%F/O -140-160 RPM,8-9 K TORQUE,8-14 K WOB, 3%LUBE CONCENTRATION. -PU=197K,S/O=152K,ROT=174K, -ACTUAL ROTATE TIME=7.6 HRS TOTAL BIT HRS=16.83 -TOTAL JAR HRS=16.83 -MW IN=8.6+PPG,MW OUT=8.6+PPG -SURVEYS EVERY 30' -FINGERPRINT CONNECTIONS WITH NORMAL 12 BBL DRAIN BACK. 06:00 - 20:30 14.50 DRILL P PROD1 I DRILL 6-1/8"PRODUCTION BUILD SECTION F/10,990'MD 11,362'MD,8,715'TVD 250 GPM,1750 PSI ON BTM,1720'PSI OFF BTM,22%F/O -140-160 RPM,6 K TORQUE,8-14 K WOB,3% LUBE CONCENTRATION. -PU=197K,S/0=153K,ROT=173K, -ACTUAL ROTATE TIME=7.6 HRS -TOTAL BIT HRS=16.83 -TOTAL JAR HRS=16.83 -MW IN=8.6+PPG,MW OUT=8.6+PPG -SURVEYS EVERY 30' I i � -FINGERPRINT CONNECTIONS WITH NORMAL 12 BBL DRAIN BACK. Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 40 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 22:30 2.00 DRILL N DFAL 11,362.00 PROD1 SUSPECTED TOP OUT OF SAG FORMATION -GEOLOGY INTERPRETING LOG DATA FOR BIT POSITION -CBU FOR SAMPLES: 250 GPM,1750 PSI MOSTLY SAG FORMATION WITH SIGNIFICANT AMOUNT OF SHUBLIK CONTAMINATION.NO KINGAK SHALE DETECTED. PULL OFF BOTTOM,ROTATE AND RECIPROCATE ONE FULL STAND. -250 GPM,1770 PSI,20%FO,5K TQ TROUBLE SHOOTING DOWN HOLE TOOLS, 'NEAR BIT GAMMAAND IMPULSE GAMMA ARE SHOWING CONFLICTING DATA. ON SITE GEOLOGY AND TOWN GEOLOGY TEAM ARE INTERPRETING TOOL DATA. -WHILE ROTATING AND RECIPROCATING AT ABOVE PARAMETERS: -OBSERVED A 1000 PSI PRESSURE DROP -PRESSURE DROPPED FROM 1770 PSI TO 710. I-SWITCHED F/MP#2 TO MP#1, CIRCULATED AT SAME PARAMETERS.SAW THE SAME PRESSURE DROP. SWITCHED BACK TO MP#2 AND ATTEMPTED ONE MORE TIME AT THE SAME PARAMETERS WITH SAME RESULTS -SHUT DOWN MUD PUMPS AND PRESSURE TESTED SURFACE LINES -CLEANED OUT SUCTION SCREENS AND VERIFIED VALVE AND SEAT INTEGRITY. ATTEMPTED ONE MORE TIME TO REGAIN PRESSURE WITH SAME RESULTS. -CONTACTED ANCHORAGE ODE AND ROTARY SUPT. -DECISION WAS MADE TO POOH FOR I SUSPECTED WASHOUT AND MWD TOOL 'IRREGULARITY. 22:30 - 00:00 1.50 DRILL N DFAL PROD1 POOH ON ELEVATORS FROM 11,362'MD TO 19,691'MD 1-MONITOR WELL 10 MIN PRIOR TO PULLING OFF BOTTOM-WELL STATIC. -PJSM FOR POOH AND CHANGE OF SCOPE -MONITOR DISPLACEMENT ON TRIP TANK- HOLE TAKING CORRECT HOLE FILL -MW-8.6 PPG Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 41 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 6/4/2014 00:00 - 06:00 6.00 DRILL N DFAL PROD1 TRIP OUT OF THE HOLE ON ELEVATORS F/ 9,691'MD TO 3,835'MD -MONITORING TRIP ON THE TRIP TANK- HOLE TAKING THE CORRECT HOLE FILL. MONITOR WELL PRIOR TO PULLING HWDP THROUGH THE STACK. MW-8.6 PPG POOH F/3,835'MD TO 207'TO THE WELL COMMANDER. THE WELL COMMANDER IS COMPLETELY PARTED AT THE CIRCULATION PORTS -TOTAL LENGTH OF WELL COMMANDER- 10.92' -TOTAL LENGTH PULLED OUT-1.83' -LENGTH LEFT IN THE HOLE 9.09' MAKE NOTIFICATIONS AND START GATHERING DATA FOR FISHING OPERATIONS 06:00 - 10:30 4.50 DRILL N DFAL PROD1 DEVELOP PLAN FORWARD WITH ANCHORAGE LEADERSHIP GROUP. -PLANNING MEETING FOR FISHING OPERATIONS: BAKER REP,WELL COMMANDER REP,BP WSL,DDI, ANCHORAGE LEADERSHIP -MU AND STAND BACK TWO STAND OF 4-3/4" DC'S -MONITOR WELL ON TRIP TANK. -WAIT ON FISHING TOOLS AND FISHERMAN 10:30 - 12:00 1.50 DRILL N DFAL PROD1 WAIT ON FISHING TOOLS AND FISHERMAN - RIG CREWS PERFORMING WORK ORDERS. -START PICKING UP FISHING TOOLS TO THE RIG FLOOR. 12:00 - 17:30 5.50 DRILL N DFAL PROD1 MAKE UP FISHING BHA: PER BAKER REP DIRECTION -MAKE UP BHA TO 627' -CUT LIP GUIDE,SPIRAL GRAPPLE, OVERSHOT EXTENSION,OVERSHOT TOP SUB,BUMPER SUB,FISHING JAR,(9)4-3/4" DC'S,JAR ACCELERATOR,XO,(9)JNTS OF HWDP. -C/O PS21 SLIP INSERTS TO 4" -TIH ON ELEVATORS WITH FISHING BHA ON 4"DP F/627'MD TO 9,701' 17:30 - 18:00 0.50 DRILL N DEAL PROD1 CIRCULATE BOTTOMS UP ATTHE7"SHOE' 9,701' -450 GPM,1480 PSI, -PUW-196K,SOW-163K, -MW-8.6 PPG IN/OUT 18:00 - 22:00 4.00 DRILL N DFAL PROD1 WASH IN THE HOLE F/9,701'MD TO 11,067' MD -WASH DOWN AT 2-4 BPM,350-550 PSI. WHILE WORKING PIPE TO BOTTOM -ROTATED OFF SEVERAL LEDGES:9,993', 10,005',10,273',10,463', 11,020' ROTATED PIPE AT 5 RPM,2-4 BPM,W/ VARIED PRESSURES. -OBTAIN PARAMETERS AT 11,067' PUW-192K,SOW-140K,134K SOW W/PUMPS ON - 2-BPM-350 PSI,4 BPM-550 PSI Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 42 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:00 - 22:30 0.50 DRILL N DFAL PROD1 CIRCULATE BOTTOMS UP PRIOR TO LATCHING UP WITH FISH -250 GPM,827 PSI,22%FO -MW-8.6 PPG IN/OUT -NO SIGNIFICANT INCREASE IN CUTTINGS AT BOTTOMS UP 22:30 - 00:00 1.50 DRILL N DFAL PROD1 WASH IN THE HOLE FROM 11,067'MD,TO 11,150'MD PUMPS ON AT 4 BPM 550 PSI 6/5/2014 00:00 - 02:00 2.00 DRILL N DFAL PROD1 WASH IN THE HOLE FROM 11,132'MD —PUMPS ON AT 2 BPM 350 PSI -TAG UP ON FISH AT 11,132 MD BY FISHING BHA LENGTH PUSH FISH TO BOTTOM F/11,132'MD TO 11,157'MD -FISH LENGTH-207' ROTATE AND ATTEMPT TO ENGAGE OVERSHOT WITH 10 RPM,W/ 2 BPM,375 PSI -PRESSURE INCREASED TO 820 PSI,PU WITH PRESSURE MAINTAINING AT 820 PSI. -SET DOWN AND INCREASE RATE TO 4 BPM, 2250 PSI, -PICK UP STRING WITH PRESSURE HOLDING AT 2250 PSI -SD PUMPS AND SET DOWN 40 K TO ENSURE GRAPPLE SETTING. -SLB VERIFIED MWD AS OPERATIONAL WHILE PUMPING. -MONITOR WELL PRIOR TO PULLING OFF BOTTOM-WELL STATIC. 02:00 - 10.30 8.50 DRILL N DFAL PROD1 POOH WITH FISH F/11,157' MD TO 800'M D -PULLED TIGHT AT 11,020'MD,WORKED PIPE BACK DOWN AND WIPED CLEAN. -PULLING SLOWLY WITH 1/2 BPM PUMP RATE TO AVOID SWABBING. -1/2 BPM,150 PSI -PUW-200K,SOW-140K -MW-8.6PPG IN/OUT -MONITOR WELL PRIOR TO PULLING INTO THE SHOE-WELL STATIC. PULL ON ELEVATORS FROM 9,620'MD -MONITORING TRIP ON TRIP TANK-HOLE FILL CORRECT 10:30 - 12:30 2.00 DRILL N DFAL PROD1 LD BHA#6 F/800'MD TO 105'MD -STAND BACK HWDP FOR BHA#7 -LD DRILL COLLARS,ACCELERATOR,JARS, BUMPER SUB,OVERSHOT AND WELL COMMANDER AS PER BAKER REP -PJSM REVIEWED PRIOR TO TASK -WELL MONITORED PRIOR TO PULLING NONSHEARABLES ACROSS STACK STATIC -MONITORING TRIP ON TRIP TANK-HOLE FILL CORRECT 12:30 - 14:30 2.00 DRILL N DFAL PROD1 REMOVE RADIOACTIVE SOURCE -PJSM -ATTEMPT TO REMOVE SOURCE:FAILED -DEBRIS FOUND ABOVE SOURCE -USE RIG VAC AND WATER TO REMOVE DEBRIS -SUCESSFUL REMOVAL OF SOURCE Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 43 of 48 Operation Summary Report Common Well Name H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 1X3-0154K-C:(10,194,987.00) 1 Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor.DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:30 - 15:30 1.00 DRILL N DFAL PROD1 LD BHA#6 F/105'MD -LD COLLARS,MDW TOOLS,ROTARY STEERABLE AND 6 1/8"BIT -AS PER SLMB REP -MONITORING TRIP ON TRIP TANK-HOLE FILL CORRECT -BIT GRADE:1-2-CT-G-X-1-ER-TW -BIT 1/16"UNDER GUAGE 15:30 - 16:30 1.00 DRILL N DFAL PROD1 PU FISHING ASSEMBLY -ATTEMPT TO REMOVE FISH:FAILED -L/D FISH&OVERSHOT AS PER BAKER REP 16:30 - 17:00 0.50 DRILL N DFAL PROD1 CLEAN AND CLEAR RIG FLOOR 17:00 - 20:00 3.00 DRILL N DFAL , PROD1 I PICKUP 6-1/8"PRODUCTION BHA#7 j-HOLD PJSM -PICK UP 4.75"ARCHER W/MICROSCOPE, IMPULSE AND ADN PER SLB DD -SURFACE TEST ARCHER TOOL-GOOD TEST -PJSM FOR LOADING RADIOACTIVE SOURCE,FOLLOW SLB PROCEDURE. -LOAD R/A SOURCE IN ADN TOOL 1-MAKE UP BHA TO 202'MD 1-CHANGE OUT SLIP INSERTS TO 4" MONITOR WELL DISPLACEMENT ON TRIP TANK 20:00 - 00:00 4.00 DRILL N DFAL PROD1 TIH WITH BHA#7 ON 4"DP FROM THE DERRICK -TIH F/211'TO 7,405'MD SHALLOW HOLE TEST AT 1600'W/ 225 GPM &1100 PSI-GOOD TEST. -FILL PIPE EVERY 20 STANDS. -MONITOR TRIP ON TRIP TANK. -MW-8.6 PPG IN/OUT 6/6/2014 00:00 - 01:30 1.50 DRILL N DFAL PROD1 TIH WITH BHA#7 ON 4"DP FROM THE DERRICK -TIH F/7,405'MD TO 9,681 -FILL PIPE EVERY 20 STANDS. -MONITOR TRIP ON TRIP TANK. -MW-8.6 PPG IN/OUT -HOLE SLICK-NO TIGHT SPOTS ENCOUNTERED 01:30 - 02:30 1.00 DRILL P PROD1 SLIP&CUT DRILLING LINE -PJSM FOR SLIP&CUT -CUT OFF 79'OF DRILLING LINE -MWD TOTCO&HION BLOCK ------------- CALIBRATION 102:30 - 03:30 1.00 DRILL P PROD1 RIG SERVICE -INSPECT&GREASE TOP DRIVE,BLOCKS AND CROWN I 1 HOLD RIG FIRE DRILL: -CONDUCTED FIRE DRILL IN THE HYDRAULIC POWER UNIT IN THE BOP DECK -AAR:ALL PERSONAL RESPONDED QUICKLY AND WITH THE RIGHT EQUIPMENT. REVIEWED CURRENT 2014 FIRE EVENT SLIDE PACK.DISCUSSED FIRE POTENTIAL ON OUR RIG. Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 44 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:30 - 06:00 2.50 DRILL N DFAL PROD1 TIH WITH BHA#7 ON 4"DP FROM THE DERRICK -TIH FROM 9,681'MD TO 11,362'MD(TD) -WASH LAST STAND TO BOTTOM -2 BPM,550 PSI,40 RPM,5K TQ. -HOLE SLICK-NO TIGHT SPOTS ENCOUNTERED ON TRIP IN 06:00 - 07:00 1.00 EVAL N DFAL PROD1 MAD PASS F/11,360'MD TO 11,270'MD -248 GPM,1830 PSI -100 RPM,5-7K TORQUE -OBTAIN SURVEY AT 11,331'MD MW-8.6 PPG IN/OUT 07:00 - 12:00 5.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION SECTION F/11,362' MD TO 11,769'MD,8,724'TVD -250 GPM,1,948 PSI ON BTM,1,921 PSI OFF BTM,22%F/O -140 RPM,7 K TORQUE,9 K WOB -PU=195K,S/0=152K,ROT=167K, -ACTUAL ROTATE TIME=2.99 HRS -TOTAL BIT HRS=2.99 -TOTAL JAR HRS=24.29 -MW IN=8.6 PPG,MW OUT=8.6 PPG LCM PILL PUMPED WITH SLIGHT LOSSES ENCOUNTERED -20-30 BPH LOSSES -40 BBLS,35 LB/BBL LCM PILL @ 11,485'W/ LOSSES AT 25 BPH -NO REAL IMPROVEMENT SEEN FROM PILL -SPR'S AT 11,360'MD/8,768'TVD,MW=8.6 PPG MP1-20/30 SPM=440/640 PSI MP2-20/30 SPM=430/630 PSI Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 45 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 00:00 12.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION SECTION F/11,769' MD TO 12,336'MD,8,741'TVD -250 GPM,1,948 PSI ON BTM,1,921 PSI OFF BTM,10-22%F/O -140 RPM,5-9 K TORQUE,9 K WOB -PU=195K,S/O=152K,ROT=167K, -ACTUAL ROTATE TIME=5.56 HRS -TOTAL BIT HRS=8.55 -TOTAL JAR HRS=29.85 -MW IN=8.6 PPG,MW OUT=8.6 PPG LOSSES ENCOUNTERED AT VARIOUS FRACTURE/FAULT DEPTHS PUMPED LCM PILLS -90 BBLS,35 LB/BBL LCM PILL @-11,880'W/ 'LOSSES AT 55 BPH -90 BBLS,35 LB/BBL LCM PILL @-12,055'W/ LOSSES AT 80 BPH NO REAL IMPROVEMENT IN RETURNS SEEN FROM LCM PILLS 90 BBLS,35 LB/BBL LCM PILL @-12,200'W/ 'LOSSES AT 80 BPH -90 BBLS,35 LB/BBL LCM PILL @ 12,500'W/ LOSSES AT 180-200 BPH REDUCED LOSS RATE TO 135 BPH -SPR'S AT 12,336'MD/8,741'TVD,MW=8.6 PPG MP 1-20/30 SPM=460/680 PSI MP 2-20/30 SPM=460/680 PSI 6/7/2014 00:00 - 12:00 12.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION SECTION F/12,336' MD,TO 13.002' 8,760'TVD -250 GPM,1,820 PSI ON BTM,1,790 PSI OFF BTM,17%F/O -140 RPM,7-8 K TORQUE,12 K WOB -PU=205K,S/O=149K,ROT=176K -ACTUAL ROTATE TIME=6.09 HRS -TOTAL BIT HRS=14.64 -TOTAL JAR HRS=35.92 -MW IN=8.6 PPG,MW OUT=8.6 PPG -AVERAGE LOSSES=120-160 BPH -TOTAL LOSSES FOR TOUR=2016 BBLS -SPR'S AT 12,811'MD/8,756'TVD,MW=8.6 PPG MP 1-20/30 SPM=440/640 PSI MP 2-20/30 SPM=420/640 PSI Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 46 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 13:30 1.50 DRILL P PROD1 DRILL 6-1/8"PRODUCTION SECTION F/13,002' MD,TO 13,116'(TD) 8,756'TVD • -250 GPM,1,837 PSI ON BTM,1,818 PSI OFF BTM,18%F/O 140 RPM,9 K TORQUE,14 K WOB -PU=205K,S/O=148K, ROT=173K -ACTUAL ROTATE TIME=0.9 HRS -TOTAL BIT HRS=15.54 -TOTAL JAR HRS=36.8 -MW IN=8.6 PPG,MW OUT=8.6 PPG -SPR'S AT 13,116'MD/8,760'TVD,MW=8.6 PPG MP 1-20/30 SPM=440/620 PSI MP 2-20/30 SPM=400/600 PSI 13:30 - 17:00 3.50 DRILL P PROD1 PUMPED LCM PILL -90 BBLS,35 LB/BBL LCM PILL©13,016' CIRCULATED BOTTOMS UP 3 TIMES F/13,116' MD TO 13,031'MD -265 GPM,2043 PSI,19%F/O -140 RPM,5K TORQUE OFF BOTTOM -PU=205K,S/O=148K,ROT=173K -LOSSES DYNAMIC=120 BPH, MONITOR WELL FOR 10 MINUTES:STATIC 17:00 - 00:00 7.00 DRILL P PROD1 BACKREAM OUT OF HOLE F/13,031'MD TO 10,156'MD -250 GPM,1644 PSI,AT 10,390'MD -140 RPM,4-5K TORQUE,32K ROTATING WEIGHT -BACK REAMING SPEED 1000'/HR -NO OVERPULL OR PRESSURING UP NOTED -MUD WEIGHT 8.6 PPG IN,8.6 PPG OUT 6/8/2014 00:00 - 01:00 1.00 DRILL P PROD1 BACK REAM OUT OF THE HOLE F/10,156'MD TO 9,681' -250 GPM,1625 PSI,140 RPM,5K TQ -PUW-186K SOW-160K 01:00 - 02:30 1.50 DRILL P PROD1 CIRCULATE BOTTOMS UP AT THE 7"SHOE ROTATE AND RECIPROCATE F/9,681'MD TO 9,583' -265 GPM,1750 PSI,20%FO -100 RPM,4-5KTQ -DYNAMIC LOSS RATE AT 120 BPH -MW-8.6 PPG IN/OUT -NO NOTICEABLE INCREASE AT BOTTOMS UP -MONITOR WELL PRIOR TO TIH-45 BPH STATIC LOSS RATE 02:30 - 03:00 0.50 DRILL P PROD1 RIG SERVICE -GREASE TOP DRIVE AND WASH PIPE -STATIC LOSS RATE AT 45 BPH Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 47 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:O0AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 06:00 3.00 DRILL P PROD1 RIH ON ELEVATORS -RIH FROM 9,681'MD TO 13,116' -TIGHT SPOTS AT THE INVERT POINT: 10,300',30K,WIPED CLEAN 10,332'-10,350' ,WASH AND REAM PAST WITH 3-4 BPM,600-1500 PSI,80-100 RPM -WIPED THROUGH WITH OUT PUMPS AND ROTARY.-WIPED CLEAN 10,350'-10,447',WASH AND REAM PAST WITH SAME PARAMETERS -TIH ON ELEVATORS WIPED TIGHT SPOTS AT: 10,695'MD-30K,WIPED CLEAN 10,860'MD-30K,WIPED CLEAN 13,096'-13,116' ,WASH AND REAM TO BOTTOM -265 GPM,2000 PSI -140 RPM,5-6K TORQUE TAG UP ON DEPTH 06:00 - 10:00 4.00 DRILL P PROD1 CIRCULATE BOTTOMS X 2 UNTIL HOLE WAS CLEAN -265 GPM,2000 PSI -140 RPM,5-6K TORQUE PU=201K,S/O=154K -LOSSES DYNAMIC=120 BPH, MONITOR WELL FOR 10 MINUTES:DROPPING STATIC LOSS RATE=45 BPH -MUD WEIGHT 8.6 PPG IN,8.6 PPG OUT 10:00 - 12:30 2.50 DRILL P PROD1 POH ON ELEVATORS F/13,099'TO 9,681'MD -MONITOR DISPLACEMENT VIA PITS 1&2 WIPED TIGHT SPOT AT 10,424'MD-30K, WIPED CLEAN -MUD WEIGHT 8.6 PPG IN,8.6 PPG OUT 12:30 - 13:30 1.00 DRILL P PROD1 CIRCULATE BOTTOM UP -ROTATE AND RECIPROCATE F/9,681'TO 9,583' -265 GPM,1784 PSI,120 RPM, -DYNAMIC LOSS RATE AT 120 BPH, -MONITOR WELL PRIOR TO POOH-STATIC LOSS RATE-45 BPH -PU=190K,S/O=160K,RT WT=170K,RT TQ =3K MUD WEIGHT 8.6 PPG IN,8.6 PPG OUT 13:30 - 18:30 5.00 DRILL P PROD1 POH ON ELEVATORS F/9,687'TO 3,796'MD -STAND BACK 4"HWDP F/3,796'TO 3,582'MD -LD JARS,CONT POOH F/3,582'TO 202'ND -MONITOR DISPLACEMENT VIA PITS 1 &2 -MW-8.6 PPG IN/OUT Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 48 of 48 Operation Summary Report Common Well Name:H-19 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:5/10/2014 End Date:6/8/2014 X3-0154K-C:(10,194,987.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual©83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:30 - 21:00 2.50 DRILL P PROD1 LAY DOWN BHA#5 F/202'T/SURFACE -SHUT DOWN AND MONITOR WELL PRIOR TO PULLING NON SHEARABLES THROUGH BOP STACK-FLUID LEVEL IS DROPPING. -PJSM FOR LAYING DOWN BHA AND HANDLING THE SOURCE. -DISCUSS PLAN FOR NON-SHEARABLES ACROSS THE STACK -PULL AND LAY DOWN SOURCE PER SLB PROCEDURE -MONITOR WELL ON PIT 2&3 -STATIC LOSS RATE=45 BPH -L/D REMAINING BHA,PER SLB DD DIRECTION -BIT:1-2-WT-G-X-I-CT-TD -NO UNUSUAL WEAR PATTERNS ON STABILIZERS OR BIT &BIT IN GAUGE -CLEAN AND CLEAR RIG FLOOR OF EQUIPMENT -PREP FOR 4.5"LINER RUN.INSPECT EQUIPMENT. -VERIFY LINER TALLY LINE UP WITH SERVICE HANDS:HES&BOT -ENSURE CORRECT PAPERWORK VERIFY CORRECT SHEAR BOLT NUMBERS. PU 4"JOINT OF DP AND FUNCTION TEST BOPE FOR WEEKLY -ANNULAR-25 SEC -UPPER VBR-21 SEC -LOWER VBR-21 SEC -BLIND SHEARS-22 SEC SWITCH TO CON EVENT** Printed 6/23/2014 10:59:44AM North America-ALASKA-BP Page 1 of 10 Operation Summary Report Common Well Name:H-19 AFE No Event Type:COM-ONSHORE(CON) Start Date:6/8/2014 End Date:6/12/2014 X3-0154K-C:(2,373,105.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:OOAM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 6/8/2014 21:00 - 22:00 1.00 CASING P RUNPRD CLEAN AND CLEAR RIG FLOOR -MOBILIZE 4-1/2"521 HYRDRIL PUP JOINTS -VERIFY LINER DETAIL IN THE PIPE AND CASING SHED -MONITOR WELLBORE ON THE HOLE FILL- STATIC LOSS RATE AT 60 BPH 22:00 - 23:00 1.00 CASING P RUNPRD HOLD PJSM FOR RUNNING 4-1/2"LINER RIG CREW,DDI CASING,HES,BP,BOT REPS RIG UP AND RUNNING OF 4-1/7 HYDRIL LINER -SPECIAL ATTENTION TO WELL CONTROL WITH A SLOTTED LINER ACROSS THE STACK. DISCUSS PLAN AND VERIFY UNDERSTANDING OF PLAN. -DISCUSS PLAN FOR NON-SHEARABLES ACROSS THE STACK -VERIFY THIRD PARTY TOOLS,CORRECT CASING TONG HEAD SIZES -DRILLER AND AD TO VERIFY CORRECT SIZE ELEVATORS FOR LINER RUN. 23:00 - 00:00 1.00 CASING P RUNPRD RIH W/4-1/2"12.6#HYDRIL-521 L-80 SLOTTED AND 13CR-85 SOLID LINER F/SURFACE T/ 330'MD MONITOR TIH ON PITS#2 AND#3 -RIG UP RUNNING EQUIPMENT:CASING TONGS,LIFT NUBBINS,4-1/2"ELEVATORS, STABBING GUIDE -USE JET LUBE SEAL GUARD PIPE DOPE -RIH WITH 4-1/2"LINER PER TALLY.TALLY TOTAL: -2690'SOLID LINER -1,633'OF SLOTTED LINER -(5)-5.85"HES WATER SWELL PACKERS -TORQUE CONNECTIONS TO 4,700 FT-LBS -RUN ONE 5.75"OMD HYDROFORM CENTRALIZER PER SOLID&SLOTTED JOINT WITH TWO STOP RINGS PER JOINT,NO CENTRALIZER ON LAST THREE SOLID JOINTS -RA(PIP)TAGS PLACED UNDER EACH PACKER ELEMENT RIGGED UP WITH HOLE FILL ON -LOSS RATE=60 BPH Printed 6/23/2014 10:52:34AM North America-ALASKA-BP Page 2 of 10 Operation Summary Report Common Well Name:H-19 AFE No Event Type:COM-ONSHORE(CON) Start Date:6/8/2014 End Date:6/12/2014 X3-0154K-C:(2,373,105.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:OOAM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 6/9/2014 00:00 - 04:00 4.00 CASING P RUNPRD RIH W/4-1/2"12.6#HYDRIL-521 L-80 SLOTTED AND 13CR-85 SOLID LINER F/330'MD TO 3,613'MD -MONITOR TIH ON PITS#2 AND#3 -RIG UP RUNNING EQUIPMENT:CASING TONGS,LIFT NUBBINS,4-1/2"ELEVATORS, STABBING GUIDE -USE JET LUBE SEAL GUARD PIPE DOPE -RIH WITH 4-1/2"LINER PER TALLY.TALLY TOTAL: -1,633.24'SOLID LINER -1,633.43'OF SLOTTED LINER -(5)-5.85"HES WATER SWELL PACKERS -TORQUE CONNECTIONS TO 4,700 FT-LBS -BAKER FLEX LOCK LINER HANGER W/ZXP LINER TOP PACKER -RUN ONE 5.75"OMD HYDROFORM CENTRALIZER PER SOLID&SLOTTED JOINT WITH TWO STOP RINGS PER JOINT,NO CENTRALIZER ON LAST THREE SOLID JOINTS -RA(PIP)TAGS PLACED UNDER EACH PACKER ELEMENT:TOTAL 5 STOP RINGS WITH 2 PIP TAGS IN EACH STOP RING. RIGGED UP WITH HOLE FILL ON -LOSS RATE=60 BPH -VERIFY CORRECT NUMBER OF JOINTS LEFT OVER AFTER RUN. -C/O ELEVATORS,C/O PS21 SLIPS TO 4"- DRILLER TO VERIFY CORRECT SIZE ELEVATORS. 04:00 - 09:00 5.00 CASING P RUNPRD RIH W/4-1/2"12.6#HYDRIL-521 L-80 SLOTTED AND 13CR-85 SOLID LINER ON 4"XT-39 DP F/3,613'MD TO 9,700"MD. -PU LINER HANGER/PACKER ASSEMBLY: VERIFY SHEAR PINS(6)FOR THE HANGER AND 5 SET SCREWS FOR THE PACKER\.MIX AND SET PAL MIX AND ALLOW 30 MIN TO SET. -PU BUMPER JARS. -SINGLE IN THE HOLE W/6 JNTS OF 4" HWDP AND 4 STANDS OF 4"HWDP-18 JOINTS TOTAL -BREAK CIRCULATION STAGING PUMPS UP TO 3 BPM WITH 100 PSI -DRIFT HWDP W/2.25"DRIFT -FILL PIPE AND BD TD EVERY 10 STANDS -TIH AT 60-90 FT/MIN -MONITOR TRIP VIA PITS#2 AND#3 -MW-8.6 PPG IN/OUT -HOLE FILL LINED UP ON THE HOLE STATIC LOSS RATE-60 BPH Printed 6/23/2014 10:52:34AM North America-ALASKA-BP Page 3 of 10 Operation Summary Report Common Well Name:H-19 AFE No Event Type:COM-ONSHORE(CON) Start Date:6/8/2014 End Date:6/12/2014 X3-0154K-C:(2,373,105.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 10:00 1.00 CASING P RUNPRD CIRCULATE 1.5 X DP AND LINER VOLUME -ROTATE AND RECIPROCATE FROM 9,700' TO 9,630' -126 GPM,300 PSI, -PUW-176K,SOW-149K,ROT-161K,4-5 K TQ AT 10,15&20 RPM'S -DYNAMIC LOSS RATE-84 BPH MONITOR WELL PRIOR TO GOING IN OPEN HOLE-STATIC LOSS RATE-60 BPH -MW-8.6 PPG IN/OUT 10:00 - 12:30 2.50 CASING P RUNPRD RIH W/4-1/2"12.6#HYDRIL-521 L-80 SLOTTED AND 13CR-85 SOLID LINER ON 4"DP F/ 9,700"MD TO 13,116'(TD)TAG ON DEPTH SET DOWN 15K TO VERIFY -SOW-146K. --MONITOR TRIP ON PITS#2 AND#3 -BREAK CIRCULATION AND FILL PIPE EVERY 10 STANDS -MW 8.6 PPG IN/OUT - LOSSES WHILE RUNNING IN THE HOLE-60 BPH 12:30 - 13:30 1.00 CASING P RUNPRD SET BAKER ZXP LINER HANGER AND PACKER DROP 1.50"SETTING BALL,VERIFIED CORRECT SIZE WITH BAKER REP PRIOR TO DROPPING - PUMP AT 3 BPM,246 PSI -BALL ON SEAT W/615 STKS/1,700 PSI. HOLD 1 MIN,INCREASE TO 2,800 PSI TO SET HANGER. -SLACK OFF 60K TO CONFIRM HANGER SET. -BLEED PSI,PU 20 K OVER TO ENSURE HANGER SET -INCREASE TO 4,200 PSI TO RELEASE HR D RUN TOOL -PU AND EXPOSE DOG SUB,SLACK OFF 50K TO SET ZXP LINER TOP PACKER.AS PER BOT REP. -GOOD SURFACE INDICATION OF SETTING -PU TO NEUTRAL WEIGHT AND SET BACK DOWN W/15 RPM AND 55K SLACK OFF TO CONFIRM ZXP SET. -HANGER @ 9,559',TOL @ 9,535"MD Printed 6/23/2014 10:52:34AM North America-ALASKA-BP Page 4 of 10 Operation Summary Report Common Well Name:H-19 AFE No Event Type:COM-ONSHORE(CON) Start Date:6/8/2014 End Date:6/12/2014 X3-0154K-C:(2,373,105.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:30 - 16:00 2.50 CASING P RUNPRD PRESSURE TEST LINER TOP PACKER -PJSM FOR PRESSURE TESTING AND PROPER LINE UP.-PT SURFACE LINES TO 1200 PSI -WITH RS PACK-OFF AND RUNNING TOOL STILL IN LINER PRESSURE TEST 4.5"LIP -CLOSE UPPER PIPE RAM AND PRESSURE UP DOWN THE KILL LINE CHART 4.5"LINER TOP PACKER TEST TO 250 PSI LOW 5 MIN/3,500 PSI HIGH 30 MIN -PRESSURE UP WITH 2 BPM,200 PSI. NOT HOLDING PRESSURE.PUMPED 7 BBLS FAILED TEST. -LINE UP TO RE-TEST PRESSURE TEST SURFACE LINES TO 1400 PSI -GOOD TEST -RE-TEST LTP WITH 2 BPM,200 PSI,LTP NOT •HOLDING-TOTAL BBLS PUMPED 7 BBLS - SET DOWN 60 K ON LTP. -RE-TEST-WITH SAME PARAMETERS - FAILED TEST •-SWITCH TO MUD PUMP#2&TESTED LINES -GOOD TEST -RE-TEST WITH 2 BPM,TO 200 PSI-7 BBLS PUMPED-FAILED TEST RU ON THE IA AND ATTEMPT TO CIRCULATE TAKING RETURNS UP THE DRILL STRING. -RETURNS NOT SEEN AT SURFACE. -ROTATE AT 15 RPM WITH 5K TQ,SET DOWN 65K DOWN ON LTP -RE-TEST WITH 2 BPM,200 PSI,:PUMPED 7 BBLS TOTAL.-FAILED TEST -UNSURE OF LTP INTEGRITY OR RS PACK OFF -BLED ALL PRESSURE TO ZERO,OPENED RAMS AND TO OBSERVE WELL. -STATIC LOSS RATE AT 12 BPH. -LINED UP HOLE FILL DEVELOP FORWARD PLAN FOR FAILED LINER TOP PACKER PRESSURE TEST WITH ANCHORAGE OFFICE. 16:00 - 17:30 1.50 CASING N DFAL RUNPRD DISPLACE WELL FROM 8.6 PPG FLOW VIS TO 8.5 PPG SEAWATER -PUMP 40 BBLS OF HIGH VIS PILL AT 4 BPM, 400 PSI -CHASE WITH 8.5 PPG SEAWATER AT 12 BPM,2054 PSI UNTIL 8.5 PPG SEAWATER IN/ OUT -SHUT DOWN AND MONITOR THE WELL- STATIC LOSS RATE AT 34 BPH. -LOST TOTAL OF 75 BBLS DURING CIRCULATION. Printed 6/23/2014 10:52:34AM North America-ALASKA-BP Page 5 of 10 Operation Summary Report Common Well Name:H-19 AFE No Event Type:COM-ONSHORE(CON) Start Date:6/8/2014 End Date:6/12/2014 X3-0154K-C:(2,373,105.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:OOAM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 00.00 6.50 CASING N DFAL RUNPRD POOH WITH RS PACK OFF AND HRD-E RUNNING TOOL ON ELEVATORS -FROM 9,535'TO 3,717'RACKING BACK STANDS -POOH FROM 3,717'TO SURFACE LAYING DOWN SINGLES -MONITOR TRIP ON PITS 2&3 -HOLE FILL ON -AVG 50 BPH LOSS RATE WHILE PULLING OUT OF THE HOLE. -MW-8.5 PPG SEAWATER -LD HRD-E RUNNING TOOL AND RS PACK OFF -RS PACK OFF IN GOOD CONDITION MISSING ONE RUBBER 0-RING- PICTURES SENT TO ODE RIG CREW CLEAN AND CLEAR RIG FLOOR 6/10/2014 00:00 - 03:30 3.50 CASING N DFAL 9,535.00 RUNPRD WAIT ON BAKER TOOLS -WAIT ON NEW TIE BACK SEAL ASSEMBLY, ZXP LINER TOP PACKER&RUNNING TOOL -CONTINUOUS HOLE FILL. -LOSS RATE-50 BPH STATIC •-MW-8.5 PPG SEAWATER RIG CREW CONDUCTING PM'S RU CASING TONGS. 03:30 - 10:00 6.50 CASING N DFAL 9,535.00 RUNPRD RIH WITH TBR SEALASSEMBLY AND ZXP LINER TOP PACKER. -PJSM FOR RIH WITH ZXP AND SEAL ASSEMBLY -DISCUSS NON-SHEARABLES ACROSS THE STACK,REVIEW DDI PROCEDURE FOR TIH -PU&RIH W/ SEAL ASSEMBLY,(XO),ONE JOINT OF 4-1/2"TCII,(XO),LTP ASSEMBLY TO 72' -VERIFY CORRECT SET SCREWS IN THE ZXP PACKER FOR SETTING PRESSURES RIH ON 4"XT39 DP F/72'TO 9,535' -RIH AT 90'/MIN,FILLING EVERY 10 STANDS -CONTINUOUS HOLE FILL-AVG LOSS RATE AT 60 BPH. MW-8.5 PPG SEAWATER 10:00 - 10:30 0.50 CASING N DFAL 9,535.00 RUNPRD CLOSE TOP PIPE RAMS AND ATTEMPT TO TEST ZXP LINER TOP PACKER. -USING 3.5 BPM RATE,MAXIMUM PRESSURE ATTAINED 330 PSI,COMMUNICATION WITH DRILL PIPE OBSERVED DURING TEST. -BLEED PRESSURE AND OPEN RAMS. Printed 6/23/2014 10:52:34AM North America-ALASKA-BP Page 6 of 10 Operation Summary Report Common Well Name:H-19 AFE No Event Type:COM-ONSHORE(CON) Start Date:6/8/2014 End Date:6/12/2014 IX3-0154K-C:(2,373,105.00) Project:Prudhoe Bay I Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time: 1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual©83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:30 - 12:00 1.50 CASING N DFAL 9,485.00 RUNPRD SET 2ND ZXP LINER TOP PACKER W/TBR -DROP.90"BALL AND PUMP DOWN AT 3 BPM 280 PSI FOR 550 STKS,THEN SLOW PUMP TO 1.5 BPM 90 PSI UNTIL BALL ON SEAT AT 700 STKS. -INCREASE PRESSURE TO 3,300 PSI AND I HOLD FOR 5 MINUTES,POSITIVE SURFACE INDICATION OF PACKER SET AT 2,270 PSI. -BLEED PRESSURE TO 220 PSI. -CLOSE TOP PIPE RAMS AND PUMP DOWN KILL LINE, CHART TEST ZXP LINER TOP PACKER via ANNULUS TO 250 PSI LOW 5 MIN/ 3,500 PSI 30 MIN.SUCCESSFUL TEST. I-BLEED PRESSURE,OPEN TOP PIPE RAMS AND PRESSURE UP ON DRILL PIPE TO 3,900 PSI TO SHIFT BALL OFF SEAT. -PICK UP TO 9,492'AND CIRCULATE AT 8 BPM 500 PSI TO CONFIRM RUNNING TOOL 'RELEASE. -TOTAL FLUID LOSS FOR TOUR=486 BBLS 12:00 - 14:00 2.00 CASING P RUNPRD STAND BACK ONE STAND AND BLOW DOWN TDS CUT/SLIP DRLG LINE. RECALIBRATE AMPHION,BLOCK HEIGHT, AND TOTCO -STATIC LOSS RATE=70 BPH 1400 - 00.00 10.00 CASING P RUNPRD POOH W/ZXP PACKER RUNNING TOOL, LAYING DOWN SINGLES 4"DRILL PIPE TO PIPE SHED. -LAY DOWN AND BOT REP VISUALLY INSPECT RUNNING TOOL TO CONFIRM PROPER OPERATION. AVERAGE FLUID LOSS WHILE POOH=48 BPH TOTAL FLUID LOSS FOR TOUR=683 BBLS 6/11/2014 00:00 - 01:00 1.00 RUNCOM P RUNCMP -PULL WEAR BUSHING MAKE UP HANGER TO LANDING JT, CONDUCT TUBING HANGER DUMMY RUN WITH CAMERON REP. 01:00 - 02:00 1.00 RUNCOM P RUNCMP RIG UP TO RUN 4-1/2"COMPLETION ASSEMBLY -VERFIY RUNNING ORDER 0200 - 02:30 0.50 RUNCOM P RUNCMP PJSM W/BPXA,DDI,HES ON RUNNING COMPLETION. 02:30 - 12:00 9.50 RUNCOM P RUNCMP 'RUN 4-1/2"12.6#13CR85 VAM TOP TUBING F/ SURFACE TO 7,900'MD,183 JTS RAN -PU 134K,SO 115K -TORQUE TURN TO 4,440 FL/LBS OPTIMUM VALUE. -MONTIOR WELL ON PIT#2-#3 LOSSES FOR TOUR 517 BBLS Printed 6/23/2014 10:52:34AM North America-ALASKA-BP Page 7 of 10 Operation Summary Report Common Well Name:H-19 AFE No Event Type:COM-ONSHORE(CON) Start Date:6/8/2014 End Date:6/12/2014 X3-0154K-C:(2,373,105.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:OOAM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 14:30 2.50 RUNCOM P RUNCMP RUN 4-1/2"12.6#13CR85 VAM TOP TUBING F/ 7,900'MD TO 9497'MD -PU 160K,SO 123K -PU JNT#220 AND#221,TAG NO GO 15.5'IN ON JOINT 221 -TAG NO GO AT 9,502'MD -PU&VERIFY TAG SET DOWN 3K -SPACE OUT AND L/D JOINTS#220&221 -PU SPACE OUT PUPS (5.72')AND(7.73')AND JNT 219 -WLEG @ 9,497'MD -TOP OF TIEBACK RECEPTICALAT 9,491'MD -MONITORING THE TRIP ON PITS# 2&3 -RUN COMPLETION PER RUN TALLY -USE JET LUBE SEAL GUARD EACH CONNECTION AND USE STABBING GUIDE -TORQUE TURN EACH CONNECTION TO 4400 FT/LB -AVG LOSS RATE-50 BPH 14:30 - 15:30 1.00 RUNCOM P RUNCMP MU LANDING JOINT WITH HANGER RIH AND 'LAND IN PROFILE -CAMERON REP TO RILDS **WLEG AT 9,497',6.4'INSIDE PBR 15:30 - 17:00 1.50 ' RUNCOM P RUNCMP CIRCULATE 280 BBLS OF CORROSION INHIBITED BRINE AT4 BPM DOWN IA - 170 GPM,410 PSI CIRCULATE 5 BBLS OF CLEAN SEAWATER AT 2 BPM DOWN TUBING 85 GPM,80 PSI Printed 6/23/2014 10:52:34AM North America-ALASKA-BP Page 8 of 10 Operation Summary Report Common Well Name:H-19 AFE No Event Type:COM-ONSHORE(CON) Start Date:6/8/2014 End Date:6/12/2014 X3-0154K-C:(2,373,105.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual©83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:00 - 19:30 2.50 RUNCOM P RUNCMP DROP 1 7/8"BALL AND ROD -ALLOW FOR BALL AND ROD TO DROP-10 MIN -PUMP DOWN WITH 2 BPM,270 PSI -PRESSURE TEST TBG 250 PSI LOW/5 MIN CHARTED -INCREASE PRESSURE TO START SETTING PACKER,SET AT 2000 PSI,SURFACE INCIDCATION -PRESSURE UP TO 3500, HOLD FOR 30 MIN CHARTED FOR PRESSURE TEST ON TUBING- GOOD TEST -BLEED PRESSURE ON TBG TO 1500 PSI -LINE UP TO PUMP DOWN IA TEST PACKER AND IA -BRING PRESSURE UP ON THE IA TO TEST TO 250 LOW/5 MIN CHARTED -PRESSURE UP TO 3500,HOLD FOR 30 MIN CHARTED FOR PRESSURE TEST ON IA- GOOD TEST -CONTACT WTL FOR AUTHORIZATION TO PROCEED WITH OPERATIONS -BLEED PRESSURE OFF THE TUBING CLEAR INDICATION OF SHEAR AND COMMUNICATION WITH TBG AND IA - 10 BBLS PUMPED,10 BBLS BLED BACK TO PITS -PUMP DOWN THE IA AT 2 BPM,WITH 400 PSI -RETURNS SEEN AT SURFACE. -PUMP DOWN THE TUBING AT 2 BPM,WITH 580 PSI -RETURNS SEEN AT SURFACE 19:30 - 22:00 2.50 RUNCOM P RUNCMP FREEZE PROTECT THE WELL WITH DIESEL -FREEZE PROTECT OPERATIONS PERFORMED THROUGH THE STACK WITH LANDING JOINT MADE UP. -LANDING JOINT MADE UP WITH TCII XO AND TIW ON TOP -PJSM FOR FREEZE PROTECTING THE WELL -REVIEW DDI PROCEDURE FOR LINE UP, -PRESSURE TEST THE LINES TO 3000 PSI, VERIFY LEAK TIGHT -PERFORM PRESSURE CROSS CHECK, VERIFY PROPER LINE UP AND PROPER PROCEDURE REVERSE CIRCULATE 151 BBLS OF 80 DEG DIESEL DOWN THE IA TAKING RETURNS UP THE TUBING AND BACK TO THE PITS. -VERIFY CORRECT BBL IN/BBL OUT DURING CIRCULATION -1.5 BPM,ICP-590 PSI,FCP-768 PSI -ALLOW ONE HOUR FOR(T X IA)TO U-TUBE AND BALANCE OUT CONFIRM PRESSURE TO BE ZERO(T X IA) AND WELL BALANCED -BLOW DOWN AND RIG DOWN LINES,BACK OUT LANDING JOINT&PULL FROM STACK Printed 6/23/2014 10:52:34AM North America-ALASKA-BP Page 9 of 10 Operation Summary Report Common Well Name:H-19 AFE No Event Type:COM-ONSHORE(CON) Start Date:6/8/2014 End Date:6/12/2014 X3-0154K-C:(2,373,105.00) Project Prudhoe Bay , Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:00 - 00:00 2.00 WHSUR P WHDTRE INSTALL TWC -MONITOR THE WELL 1 HOUR PRIOR TO DRY ROD INSTALL OF TWC -CAMERON REP TO DRY ROD IN"H"STYLE TWC M/U LANDING JOINT AND R/U TEST EQUIPMENT PRESSURE TEST TWC -PRESSURE TEST TWC FROM ABOVE -250 PSI LOW,3500 PSI HIGH,5 CHARTED MINUTES- HIGH TEST FAILED -MADE ANOTHER ATTEMPT TO GET A PASSING PRESSURE TEST FROM ABOVE WITHOUT SUCCESS. CHECK SURFACE EQUIPMENT. 6/12/2014 00:00 - 03:00 3.00 WHSUR N SFAL WHDTRE ATTEMPT TO RETRIEVE TWC,UNABLE TO ENTER PROFILE WITH RETRIEVING TOOL. -RIG UP WASH DOWN GUN TO DRY ROD AND FLUSH PROFILE. -RETRIEVE TWC AND INSPECT.SLIGHT ROUGH EDGES ON TWO LOWER THREADS. CAMERON REP DRESS THREADS.. -REINSTALL TWC 03:00 - 04:00 1.00 WHSUR N SFAL WHDTRE ATTEMPT RETEST TWC FROM ABOVE.HIGH TEST AGAIN FAIL. -TROUBLE SHOOT AND DETERMINE LEAKING DEMCO BLEEDER VALVE. -RECONFIGURE FLUID PATH VIA CHOKE MANIFOLD TO BE ABLE ISOLATE BLEEDER. 04:00 - 05:00 1.00 WHSUR P WHDTRE SUCCESSFULLY RETEST TWC FROM ABOVE AND BELOW. -250 PSI LOW/3,500 PSI HIGH 5/5 MINUTES. 05:00 - 05:30 0.50 WHSUR P WHDTRE RIG DOWN TEST EQUIPMENT -BLOW DOWN LINES 05:30 - 09:00 3.50 BOPSUR P WHDTRE NIPPLE DOWN BOP -PJSM FOR ND OF BOPE: -BARRIERS FOR BREAKING CONTAINMENT: TESTED TWC FROM ABOVE& BELOW,KWF ON TOP OF BALL AND ROD IN RHC-M PROFILE-TESTED PRODUCTION PACKER. -PULL PS-21 SLIPS AND REMOVE LOW PRESSURE RISER -REMOVE KILLAND CHOKE LINES,REMOVE HOLE FILL LINE -REMOVE STRIP-O-MATIC,RETRACT FLOW BOX PU STACKAND MOVE TO ACCESS THE HIGH PRESSURE RISERS -NIPPLE DOWN RISER AND SPACER SPOOL 09:00 - 11:00 2.00 BOPSUR P WHDTRE NU TREE AND ADAPTER FLANGE -LOWER TREE FROM BOP DECK TO THE CELLAR -ADD 48 OZ OF LIQUID HEAT ON TOP OF THE TWC I-NIPPLE UP TREE AND ADAPTER FLANGE. -SIM OPS:RIG DOWN OPERATIONS Printed 6/23/2014 10:52:34AM North America-ALASKA-BP Page 10 of 10 Operation Summary Report Common Well Name:H-19 AFE No Event Type:COM-ONSHORE(CON) Start Date:6/8/2014 End Date:6/12/2014 ,X3-0154K-C:(2,373,105.00) Project:Prudhoe Bay Site:PB H Pad Rig Name/No.:DOYON 25 Spud Date/Time:1/9/1983 12:00:00AM Rig Release:6/12/2014 Rig Contractor:DOYON DRILLING INC. UWI:500292088300 Active datum:H-19C Actual @83.91 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 12:00 1.00 BOPSUR P WHDTRE PREPARE TO PRESSURE TEST THE TREE - FILL TREE WITH DIESEL • -SIM OPS:RIG DOWN OPERATIONS 12:00 - 14:00 2.00 BOPSUR P WHDTRE PRESSURE TEST THE TREE WITH DIESEL -250 PSI LOW/3500 PSI HIGH-LEAK TIGHT -RD,BLOW DOWN,TEST HOSE I -CAMERON REP TESTED HANGER VOID TO 5000 PSI FOR 30 MIN-GOOD TEST -IA PRESSURE AT ZERO -OA PRESSURE 20 PSI. 14:00 - 15:00 1.00 BOPSUR P WHDTRE 'SECURE CELLAR, -RU TREE CAP AND ANNULUS VALVES WITH NEEDLE VALVES AND 5000 PSI GUAGES -RIG DOWN RIG MODULES AND PREP FOR SEPARATION SWITCH TO SUMMER MAINTANCE REPORT. -RIG DOWN OPERATIONS. "RIG RELEASED ON 6/12/14 AT 15:00 HRS" Printed 6/23/2014 10.52:34AM Is 1 2a3. s:. AB . ;all e s & ,' a2a" a" 2a a a aaaaaaaaamaaa $aa aaaaa hada :.:.'. P:::9 :3:: X9.:9 �3 a w 1 pm 4.174 EWE iifEER r-AaAR MP c,"' tette g:ttg tgttt tttet gtttg PPPP4 a, S 728 cigmgag Viacom �xEra ElmEgggl ggsga 12284 12422 34323 aa3'22 0.oam Waaaa 2288888 2282A 28W0 2SASO RgSgP SgSR2 4.228222 23328 6662 213266 2132222 22822 N$iii igiii kigN2 HIRE 11111 11118 2c3s8ao �2 �a �8.s ory-nn 5ryg�d os � - odd o',000 oo0c0 oo0c0 00000 0000 g30oe0cng 8.13F. 7222A o�2a4 Ofla:: 0000$ 00044 m4m 0 00000 .. (3- a '� 88882 03=1@.s 139��.0 $22413 So�P.L ,�+`000 a, m a 00000 o4ogo y .16221 44000 00000 f gm m a S a 3Z S5 U ; 3888 o U�$ $1 o o pw ,-.-- g4 �.-8' NMI''`., -0000 0088.. x S � gm ,� ',2222 .� ,.......-N Ntinn- o� _ U E' OF 8� <" s � pp S E oQ w o x 6 i 4 Zc�3 0 p 2 0002: oS��ry ,RRmffi !2.1".”, e m : 'r; ."-!1° z; a L Q O 000 r-r—N fV.'l f�sYV m _a t L L oQ 3 5y 2 d .a ' g Y r� p12-w 5 e E z P. A a a� c M 12E0 .2; f L 2 y .. °a S a.. .. d z `e os u2 u '. QDyg s-s W 88844 44400 28$$2'`2 z r a'rOA22 *44924 > 'O `3�trCsgs oo �6elsca ys �n 0 m Q al 4 ,1 L W,2 C S —P s&O C U m r L - V a S o V 'V 4.N N �'i>` uirur;oS .7rJ a = o zC°'In AMP EWA WiPAA 11§81 ase„ W a. NMSgr P NPwW o0 PP .1V7': P Oi Oi*PgP PO w W 6 PO1 w W;n4,:,;' r I. :4,m 7 Y: p p p p p p p gl,:5i 888mm NWIO_PR 748:2 2'2227 872RP 7284; ���a a _"RA ARFx'a 4.7.21:711 "1"0 aIxag *14—W4 a 7, c a 3 ma3w 8.,� - 888Hfi pg2:-.N 8R4R0 W128 r2=Sg 2822 j F; ,,o1§ - 00 0000 0 0 220 memo. ',mood 412ni�3 13zV8 E 0382322 22222 22222 22232 22222 32323 c As . s —499 .,.,'S� ..8888 SS 'g^ @MR ERRE% p i N K ry O Eva!W ! m s 0.5%Y2= C14:›4 s 2 ii n5Sstd 4 8 w 8 r 1 zogc .� � a 2. g 5 lc REM ME; r SFR � noM FEOEU PEFF IF'RR RiFmN�ry 3 sa54: azazR sale a414: 44;;;s AAA a AAA AAAA2 al evY!+ x3711 !! arida !U !$aa+ a: 03 !3:7.43 371 kmw k S AM Arles 5AM Ml � M it "asw �132 $ 'a Ali RRRRR RPPRP 2PRR2 feRgRR Egegg RRRRg gggRR rkgRg RRRPP R2ReR RRg r4N22 '2282 :22;A 2.144 2542: Via$ a :2:22 28,2;2 4Nees 4.2 2gHi ARM oAglammm�m !O H Ma ErNig aAtirb mA :r $gin aaaaa :3344 aZaaa aaaaa abase salsa aaaaa aeaax aaaaa aaaaa ala ra -roRaa :22%2 2; *222^ ;rmoNr.som 224:2 m^aaR; Att = 822_2 mZ ha IoM p 1 28. g Aqj p 2 r ^ s gBg2 Hid HIEN JAI Mil EMI kali 11E11 IIIIE ss ss8 IRE sem !!‘MI NN� g8 ��m^m 5.!!” N7�h 3$e� ..^N^ SSS: g OAC \'^N rY1V0 .-N.'.^V WV: ^lV rt 1`iN IVCOO.- �OG.'1 fV ^v1 e'i IV^ L ag Nom^ 242 vaTrR A22:: 222Z:472 :42ppA 72Z : A2M2:: -'"'V ggNon NNN^n ..:^N oN"rvM 'Y1T4'V. msO V. � Aa AP4 yE 8am;M 2h22: x;y.��(ry;e,� n���e2, :2:22 �° � p�°,,2R24 n ^mA 22.$g: g22:2. :2:22 .1ct2�2}y WE ZsEArri EEREE 83"- a tE ^<8;: 2:442 2q 82;24 aVvg.% :882: 18$8:° 222:2 472:ry No7t Noor ^.��a bkASM : gAAmma aAa srr _ NNN N n ^M pp MM .Ny _g R4OBRi 'NOM 22ao: A2:2: .%.^b2. :22'02 �,�.on 24Z:2 2.12/Z4Z22A :2N a 2:22 8:222 "2711 FERRA N Ad sA�AA ERM, r58s1 Edlxa 3 C yq WE, 2eon2 2442; .M AIZRj 2Zn22 `2 2122 24R:2 ..no4No pao1 :R'i:2: :2242 2Z: 4 - 3o "wgt§r, m�R�A S RR a a3^�g a2aS 34?ga7 747 7 4®m FIE 22452 Yrs 22 A4-22 mti�".:: AR:22 RZZA: '5,.8.2:.2 q2i`-,!.$ A22:4 ^?.88 daR C o�ueQi rry o��^ri ri o�^nm Or r `�+' ai^�i+�}S� ��.� .imc RERU, M!'n RMxFJ m s ::res 1Mt < 12 Elmnx a xe^ sso mem gF 2222 2:2841 2222: ::2;2 2:282 2S222 av°ii`^:'e'o. ..°.?24Z 22ili 82enw :22 I- "4" "Ar __cs IMAM kEREE ARR A MR EARRE ��MEE EE4 ^ N lc FA n m&�ar ^ '2�m�! A!s:2 V.;!114 m8 n8 $ . $$��p mar �N.tiam .Nd.co'0 ma0t' .hv<ae :$v.r'l :RI nnrZeN+n 2E g ` tga 2 EigoMWa ^ ae 00N1 te1tell 'Hag 111111E N y r N - F°-$ O C, i' p "s m$ ai �VM-g4 aR1 a s gm gmm24 n/��m 9 2 ss sssss 91ss1. i P' xmmzV ga 40- n a °i CO as 3I133 33383 3 _'i' IiiawN Z 0. 'Na.m...m. 'm's%m's m 00000 0 Hi 3 tiff 3z2- S2P-2 GP.�aP 1 -mmm W mm IR mans., ME, m' iii CO a ; -.4..t: g!,,S ° �3d,^. 8 i of m ry' n 0 .SI $H O 4'40h 'P r ^n H0 a 6m sg � 0 3,a gV2sm A/2 N ;m Na nlgle mm?5m g Erma 3 X . a i ng 'amAo"' rSr^�w :oa§ EH _ f ` _' a s N sta«y,A M<Z;tn N E c mil^ 2 + ,4 _ s,a ggAZ € z8 ei 4 1 \ 3 v N P .P!n IV n ry N YI n t' ii ;! Ti tJ p 9 .1'6 'l a m 2 �; ..'o Evv f,i _ a F m,j o$m'S,n �ha�� ✓Eim✓Ei ' o ';14::-A) E4 �.V 6ffi �" S 1 aalP MPF ; 8 nus A2 .8 gv,§02 aa« >' e 0 $8��y+ if > � � a1 >SF 4 !!o:” �a4�a i ` A a F a2 §"OR 2r �A nl� n qNI ,yl g El 'MOOD t .z 3 E -FF W nH co E O wg 426/tmnnAgg o C ^un $ AIM pWm( f 2J v. N N LL d C 3 g H _o �� n tNq ^ $5N g a bp' U . - r tV m 0a i FF a 0 Hill ^��, EMI v l' mlep ammmm it ilonrpl ':a m: 00x'0 r r nnn m2 n ue nn n N mO18n Mnno a nn 'OM TVTVT TTTTT ITIT: ITTIT 22TT2 TVT4T TTTeT ITTV a NNIp V w2 %00.-�p N Mil MI y^��-f�Nn ^mp � r pjN � �' 121 w2'IngO Ntim N hY+q hh08 hhINi1 N 1N00hO� IV vmiNOl�Y- mO.r N 22 22 L2m22 mmmO, EEg8� R 9 �r$$ $r� m g� 2 mrm N m g{ ry�ryry� N�`!N ^! N�`1N�1 �1N NNN PPPPP PPPPP PPPPR 00^00 PPPPP tinnnn Panno oonti ♦♦ 1OO YY pp p i0 C 1888MN XVIRV01.��0 NOIV '0 6y201 2rw2fYO LI.Trs00 OeNObr 'OP0N A hNmO1 Wea m1201M11M ELM MB hOm124 EW MI W yy YNY♦N�0 fNf♦N♦ pp VV pCpV y NyN YN.Np Ny YN VN YN pN Y Y yNy N ♦�I�Nf pN NNNyNN a 210aIps 200A0010 ggi'a imp SasYm GQ�mapaz asamo10 mWalm 210Vm VN £,.08000 O2i2m%M Q1ZR22 2121p 11gp St7 &rale'? 2+22 RRq p:2522, NOOry01d..�?R% %%2%% 2 2 2 2 2 2 o m 2 o 2 2 2 2% 22%22 2 o 2 o% 0 2 2 0^ m 0 tp 2 .m.2�O�pp O�pp 1100O110p wOm 1Op1OO .Ip..�p.�p.yp.(p �OOg;�.1p.p.0p.IO 1.p.1p 22222 132002 2111200 N22OON MOil UM Np12O1O, S� mh0 m gg%n YO N N N N N NNN N N N N N N N w N N N <80 ♦ m NO 2 NOI�10 020000 O ��m 00yNNv2i aInT.1 00000 ooaoo L ooe aoo0e oe <o dnN E 3oeeiwn 24222 1=222121 0IV2o0 00000 000.- ^nw22 R 7-221 .- 01NN aad9q X11 �9c:gd 0 00000 0000.= k x8888'8 o ry8 8'4:,x2' R222 24 q 2222T o�m+lo 2S2R 00000 00440 • -,, NCI1, 1 R900P 0 00000 —"'"1-"'4N2%Nd Y _ Ni E U 3,g 1p D eZ gg a Io .waw :' x n n 2 2 2 6 ex 0000; ^dm$ ..Po..a$ OINNN$ 00 �.R �Co88 E ,�`, Ro ; 00000 ^.- �� .- tir ..000 eon .. _^N nd } E:=.21!: . 1 8. ,r1. 0 U i «e,Zav,= a g0 m.o n o x m a tl oaa._'58Em;2403 N o!!�� ”, !!8. m:4,1 !Mt! N.��'l .4"" a Lp !!!F-.: ^�N r'1N1�fNNIC w1�00m 222 0 0=C1A2 ,PhwN O Z C C 0 y I. C B 0 a 5nsES cw . x 0. 00'1 re o �C. pzZJ oe !it 4 8C t Op w 1Gp 13O11 �1yy 11DDpp m c g o Wy t L LL LL“.. E r c m1. W c888d2 m2201'I INNINJOm00 NlyN-ONS ste22100 Y1^�27.1! rYSr2 142 L 999 9999 91Y"7�$ 12vor1�T 2 U �4YC4 � ., 3 �pYo > 044 90400 O,-^- NNNN OJ0 0 0 clAtEuwnSBtt oy, t a M i, -'w- "o1axfa$aa 80 dO J 4 4 J U c 0 2 U m VI°S ira C7 a N>? tl gF OF a) CZOhhmn 22222 22222 mO0W0 0D m' TL,-.:;;;; 2u ?�r N N•- 0 OM8eppm0WM O1nManN MI NNtC nNMrd U w x. 2rn rr r „,,,, ,,.„„ PrOrN 22:g2 %1.12 rNO N„�rF A2 PW NOi C>O�O. Oi O�NTN : :0 O+m::aO 0NOi0 ' IOR42! d 2 : ..0*1 NNOP'1 NN NNNN00'1 H17Ah Z LL .?!s%',j A 7 C Y 20 O C 8001' 01-12 mn12"27-- SBO V=2 f� nWmO 2.2212@'112 8200 '-'1'2:3,: 1.. 0002 NN0 �.-�”. "11"n 1�1'1fA111t2 ..,.4.1= "2NN %"-,L73 ��eo E 2r-F1 a 7 0 -.-g3.zi i N n,.„s E SMO” Ho=ry F0'.;n ryoNNw,1 20000 ooa 01 FNI.+cN 2wi�u$n 00x00 00000 0 000 x0000 00 o : G.4.... 2 N mi F.2, Mo t,2 tii 42ia ==ti=IN272N p b 22 22 2 1+n222 W0000 9s tenmmm ml�2`�h °�h228 I�2hia,la 11a � w211�m1.d mwu y e�op 1�1r��O C! 1�1p� .y 'Ma MM MMMM1: oaMp OMnao 0 yyC O M MY102n mmOHCOv Bow,10000 02500 N0 H l NNN1�1n m S. Q NNN 222x26 '"1'N'IN O K w W C 2 T qI 17N t. al(:)1 t .11 tsP-m=.78:t )131;101M13; Yah c >^.. a:'n y,f6 E @ 3030 c C c ^ •c Q U v.N S m 6 m N F U J J U tl� U 0 up0 ,z-:'W24 lNn W ON W mnOmr1ryo0 bN YT n" dmerb HO0nappvvr irvn Y3K1 bn'.aNgE N"n wpo2��p11Y0��1 0a$i_ N ogrAt; pHamN ufp mmnp m M r4aE ^QnnNNp20 2-1Npp N a m Lin?, ma�A 8mm ommWm va:21 2 2222 22222 N 3 tlmfaafoevaIII" vav !aaev 1evavdvi "ITT "TIT v a 1. 1 §N41 m�N5N Nn ; g 2HIs1 " 0E nn na **EH X22 o0moNSlcmmm mnn N=si - lnngggF,E 2'4n21 ry12ry2ryN,4.1,4 n122 o TcZ-42 nrn0c00ncn ^gong 22^2w 2=222 g0080 00n00 nwggg ggnog nonoo 2222^ nro � MMx !EiF H° n !%! F � ` !gP2 g c " Nim ' frEbN A2322 ;;;2211 N`AN42 NNNMM I aaaaa aaaaa 11111 aaaaa lazaa aaa3a 1,11,11 aaaaa aaaaa aaaaa aaaaa aaaaa a O . NoNa' HNV0n.4+0lNN r0o $V-N0ry0y.NriOn�Ari�mri SbH v..oY0di v0H1 u0a1 N0e2i02ryo202 ^Htl2tlnM2NN NH 0000 aY10V`m 2 NNON20g" MEI �bn.aoHE?" ?" aOa=t �HqM�"boYb, �ompovOiNv0m,:0Aq�N E.�bWlENNU`i.iana N ,,n0Cn HH_ !!9.9 5000011MMtl'f FE 0OH.- W YE ';:E--;°4 12021 22222 �$ 2822% 222.n-n P2800 24228 2222n. ^,22 .9 2212n O cix�N.1Outl.1 N "A" tl" FME N1bN 4.7.4 E5E 2YV ;.N-"N Iy.N-..2Nm4.3 re'OV '4!.7"2 22412 22882 2222.2 722G2 222'222222 2221 • 2"V7 unn MniUHpNb FargpN mub Um g N 2122.2 n2 • 2^222 22221 22102 22222 2,2222 M222 21.%2,T22 TNm2n u zi a "2'-p MddN arm FEE'--,E EEM .n42M22IanN0 Linn Es1S mx a cal, 231" 11222 =,11a 24221 `.1voooonm'_°no 12,%217, 12AL-2 2.0:'28 nnn4 221.013°'4 �qnn.� n mWNn1 m�� ai E'a nn uV;Nrmo cn� E p� M2m �Ny Oa; SHE NAt'lna O hYNfbm 7,O W T O^O Yh r-e-.-.-.- n�mrNmT TG.�On. UM! �y cni n tiv HEN c WY` 041Qo2 2znN 1222 11mm2T 2.2212^ 22282 60272 28eu� 111,187-7 n,"N�a2o. �a$ewvi 17712222 O O g �& a 1Q ��pp �p �f / w�� ` MrYI_b 0012 Y1b 122,24 _ �_ pa0 Md b Ulm NNNN N ��Q . N^.n. NN.7 wmia 2 $n u�NN11v 7? Mr-74 YTT 41444 41'14'? Ulm �� G..m 22422 no2m2 rer! 22212 2n182 2S227;v H1212 12241 , rn01218 224a1 *2 112; • mon 110221VN, 2 N2Sgton= M1MMOO M74H17 tlagv 411'2223a2npmb0fb 02123 lrobgwnn^nn N y.� r�11mm v 1 n r :9%2202 Y�ttl 122 �p Y y1 m0`pNOr� mhng' adO�OQO�pi Vn1G Ot00 t`•I aD Ne-N I�O.`�N w1000�12 N NO '4001 V�0�� f�fYO�dm �p tl.aO,�p bN QN � .O O .O�i1 2.1+'4222 �12+beM HOmti� �mr0� g��yy �me�01 QN$e�� Mg ��d.Nm �tGbno Or w��V P "�' MMMnH PUFF $70112 vdvav 19.9'4.`^22+ HH,.? WEE .020, yob �owwlb 111221 b M • 22:4* 22. 7 22221222NN22 2man" 2o0n2T 1;848n N8'.212186178%4 2c m22 ;28V-4 � !VNr 113 mbPum umP Pg,7,RgANJNN NrvNNryNNNcIVN ryrii2 NN�N- _'_.. '2' 2 • 2284 2OT 21212 8T222 mr.'22 m 1�2p0 22222 22222 2 22,712 - ; rvNry ry-4222 ^HaiY V4OOY 14420 21111 22222 2,2222 412`11 82822 M cYN 28888 8782 101_ 22^222 ogetv4 71222,7- ,'C42Na a Nmi 22S2T °48220 Af="8'� '412'48 3 8 5a:a Sn3^b4v 4vE e� 7,N NN4 " 2112"1.1^ 0212 t3nm NN nn121 VV p p ��pp 24211 ^^r M 2 Op1 4 2222221 8 1�O.Oma b�110110 �bSgg nf�l� hrt`"n/- t�H mro oO c� y fV A o T .c u � 0 0 i• a gAl pill gitlE gL x.n2N o ,m1^ ovri$to :IEEE`0 ..y1EF 11" 1 EMrEEEo ~En'mmoo$ Wes "norm m$Ea a MmawnNhn xn N EE Noi!. NnFa 1111 mamo m11mm moo 2012 121:4Eoom madam 11111 amaa11111 11F.1 a o0.mi mr aa:aa :+ mrvaTa w� aaia O<00 lava +v+++ a:oao vav avaac ++ aaava viaaa +av a •p• m.pp� �m r ;.EP"..! N$Oo 9M;€' YNNn ' "g!' �2�p7,En MP' F.91N f1��NN ZUFE nNCION app.♦N � mMNn� P qp 9OigOm M o PtlbvNfN �d D mb2 MNONm 'NeMN n�O2n z � N � � m mnyayva vv�� 1111 �� mtiNrH .- .- RR mryam 9 n cmi,'Ed : ; : n EEEEE My WE 'MAE AMA A Si PmmP nnrnn EWA N NN F Yv'Xi 7ynN EWE .oN NNNNN Nn�'1�"N NNoo n F F 0 C G P O 0 0 0 G O rwnnn nrnr nrr mmq:i iq mmm oNmo f L-, �aNC r li E E d o vNi N N N b ro N yn� O M N V•b me m 1 110 a 0 P N N O O O YI ?I'M d V e V < dONNN �Y+N�i b�biG rtinr �t�-FOo masa 11331 I1I1a I3131 31311 3aala 13111 31333 33131 1a1a3 33332 31113 1331 c moumi,rr :1.6 S,nn nnem$ F-'4nn navrM ao mg7,1;2%Aimm mv,RfsIZ g,Ivrirym nm mHdd JH + o^i°m, vJH HN PYFV! mEENNOEiOmmnNmm "nS Euig mAnnn 11111 N11NN nNO1 n1N1$ Nmbm mPPnPPrneh1i1111m m $22; M tl - ^' :1Z1g� ne„ c'$mag 1a'*mba m'g? , ��ic ro woo Pvr-gym otv000 ON00,- .(2n O1.oun NNea ra.00v nry MN o nMm a o00 o--oa oN000i 6�rid� MaNMN roamP i fun2n ie:M."d nvdo n'N nn*' nNt18m ���•,« mo 1$ ,,11 oamF o c•..,n n: Vao •1241: ova'o rol+� 1x2 m MAA asnflMM NI2PP r "m'g '000 ooNomq+ 1°128 N o aroryofn, tl NN WPPgr " mPNmm NmoPN -mnM V zXa�vm m�h'n.tloM m�ao�u �n rv'a,9i m� Morm nm�Nrn tom m�nomao nsi,�',°=r a rnaw�oP r,^e,� � pp :!:! V,,1�p ppp�nvm : :: PP '-N•PL^ Nh �O dob- MNutlf ! : : m : :r �NNMV n-g= "t/'mm p rr NA NNPIRO Pn1No 1m^m O;-mYN 3P ;;6;A1�:1�A APN.,r Nlepm Mmmn H Nf P IVa pp WH" 'PON PAH "bm0� •I�pi�-: .���1+'+11iOnV PAH ONNn obvNP nd nn^ �j ro d m 6 H H H H H N N N N N N N N �y N�y N N N cai n N N N m n N NNP P O M M M M M M NN NNNN NN NN Nr)hem•1M MAMMM ▪.m 2a2X� Hm 11,0m TamNm ;;42Pm rym vmP M`.-0MGmqg • g176"8 rPahon • p $M 7AaA3 nai;;.mA Ygp.,ngo �� . ggo•- Rmmo 'Rm 1a• 2".. O NNNPi gng;; 2MnngAAIM gqAAEA AA*Ei t??OP adaaa vYa1T1.7—'4:41118 Q0 C hicg2ga gi .�,m NP2VNN aam,9n nam„ t'2,1=2 '�MN n M .1S:;;g�.�7 na oa Vg2Tr~Nangom n�Nagl.1 ryi-nmmmmn.�i ti nepioim c gm! EZ♦YE raiNq NcNNrmq HNNNt'1 tf•�Ann 2 a p-r&8a$n m$o,>g$,m m��•2,Nm rnNaYar$�ao *488 2 mg7;rP :=P2,,vs gmAmM am1z7n 4 °."-4Z • g:mry .V6'212 2ar 11ERVail Hill Hill Hill Hill HEU mmmo EMI mm$ mmmm hYHc;tO Vsgw,q 2;71A2:2 NP;ZNA r V n m 1Np 11m1NN 610 S2PAn o•-NON mHNm 1.mm� m���o S�:g7x ��� � rye. Z ePPnm IEEZE Mit Hill $lm$f FAmonm F'�S'mHn'mo$SY�dmR IIII1 m�478 FE' VnNF 22M1 0omn PVA22 nmAt2a N�. :mm P.17-7A;; i 7mo N '. anrmcaNgrio , -. ep; 1m2non bom�' rrnrne;i; m mMaroP212,7g ennMg3dmm a;:-.322^$2 r•-.-•- y o N r2MH' an ,;,Pmno�m f on m.`•ia�r •OmmMS So. v a ryaooa `V RAgi Mngn gn,7;NN �'+MNnA, 1,14;;V a N A;11 mrn mm Zmmm1 ma,V mm ”g32 ^ M o Pooei mmon OO 7TP 7TP m 7TmPPm R=V2ZV vm V2 1n ryONO o00m 28t2AO %,”SI albryroN pOpMNpNO Ay NI�;On Ytli,N 7y eej lr=AO2o t117n mN. m F � n dP V NK ..a�" Il mti NOM NOmi M.p,N �'i<oOQ Yl•fiff plmm oNONY :7-A r1 M V NmH P4R m`a87oa MNa7p7s�a 011111 Iliti 0002; 0 00 •-'-•- �. N 8 8 � C E r O a 19 !alvA FEW " cnn mommmREM; uti nN 11"n "5157. + *-m a 9 S Azzaz mmma211,12 2 2223z 2m2mm m1 2 a momm m.6mmn sp vaggg v_avaa aaaa avvaa adFvY r 1c2 OYmp14222 EFFP4D-R N^mmr v O - n %N n2 M NN• :^ F F1,* N 1r„ mrvry RgAgN nmmgg gggN gggN m rnrrr OOOOG 01pFS r^O>OM1 70700 (O C rmN0v '9:7,n'..! V h ' s:Pmr n ',iO :7--'in!'in W ,7,gNAngAtpp 2„ H< NN,rpO mmmAn g 2222aa 22522 22222 2522.1 22222 Er "�Wos F'''''n m � o - ma `a mN2NNm°941 Nmm22E2 is272 Zm 22222 22,nnm n2F22 22222 Y MNn2WYnn NmF22 N6O 14E1„! Y222Y ^012NF_ ! YON ; m2g2222 1111111 . Miw Wr< ssyY 7.7*WW;' 1 =.;1111 , 14 1r2 No'rA oonryn6mm mmNoa mmmua '<go6 U wm ' ml000 "4" $ nEWrNe m .?'?'7�! 714TT 1447Y 44474 yY4YY .� 44oi O7 Waan m . • o t,E,. 2220 Nm:!vOV aPP� 4-222VbLLiLLLLm p n :::: ::::: ::::: ::::: ::::: .4 _rO0OhN.§ r m 4 io +a O u2Fp� 1Z 2 W YmV.2 4REgh OAp2 GW478 G c 000 �jp ypgF l'''' � n o.A�(o22 222.12 N.O2.O OO mamam 2222 Q .- .D.ON q C , �'� ~ C 22 V C i C O f 1 V ° fl 1 03 VXm °r°nwmn 222m 2ao2g2 wpm �nry 27701 2 .1£gggAN2N >,p c z q `s�� 0 nn nnn ;CF1mi iM$m0'<a MEI •...aa =------- =C Y ❑ I ; '���� . H t. 0 n 0t 45 f4 sS m22 meoS "Sq4 '".oho "2." 7 gU5£il e• A :e` "0<->k LL i7N V!NNW m y E msmaom onmmwm mmmoc mmomn mm anomm p .... O d o. 0.g t! W —= . W m VL ?. ® 4E. ! FA C i+ 'u.> 4.11 > 2.86;7 Nim mo8.,a ;gW.9n O2v O�vvn 267 nfl moV2m • m Mng e k N MEI on`rnn r T�'7�� $22220 m �' i Will MEI Mi'l- MITA WEi orFiis e o daoaa 2P27,,V 7i20 naa O "'Nnwd 82222 0 E C88g$22g 2,, EE -.- ,. • .- r f n .mom, !),,..7.i.-:-a iu Q m 0 a _ u A .JN . m o L 5 _ om C .---�---`- �i 1W1 �a Ymgm r.1:7228 �Yrvvn 222.2 a a morn E mmmm� 22222 22222 22V,22 a g e.,-,,': 2 "'"- 0 .t.qp 2 LL 0 C a Y n C11���ODD p ill= .. r mm«' R2°22V mnrbN 8r m V S _ a �p MU qq ♦Y yy.. mm OY.� S �£Nm rNOh.O SAN nWN 0 me X0600 N ~m n N.`^.nrvN NOm.IN N.�i NNNNN m-.-. pm Q OC TiO Nyy v S 8 p wa m Vo a. O N O 1 a) a a) 4.'7._ a n o o 0 0 0 o C N rn O I co^ U1 (h m Cl a a L() Ca a C S S w i 2 O .c O U CD C) c Ua C o) o H °D H o o C (Ni m a m 0 C o cu wU U o aai v N c w P O LI O IY o w 0 .. a O` _i m J m o (7 N r � E E . E . . N a' (n �, y T OL N (' o o (� w LL 0 -0 a o O O O O _ NU O O O OO _ _ N O NOJ J > O r N OC ^ ';-<.,,,. N N y NO a0 w aw3 a) wNm la T :,11:: U• L L a) o C x C V ^ : : i 7. E C .(7) J o . 99 O U) ❑ O > J O N V } O • p d 2 O 0 I- C') V V O V S..`..4 ^ '" w N _ w w D E E m o a > a > d 4 m3 , 2" w o V Oam C) _i2 n OCO Oa C O) C a 'vN >) d w E () O O. ri N > N wa o m o m o E I.-,-- '. ooU) v w w x x > o w 0 0 w x x > u) a)Mo m o w w u) a ❑ w w n a > _ cr > aCQ + ❑ N N o a ,a -a •coC CD _ 3 C jO I ri w c. EC © N < 0 C7 2 .a Q t U N J w CL w ^EC EC = = ,-7- Z U (6 o Q -o o O Z V O .-. _ O N _ O O } m 0) 7 m \ - N ❑O rn a U) a5 0 O a coa -O .. 2 4 w O O _1 1] co O 0 N CO O 0 N CO UD O a N z E (n O m N cd C• N N Od CP I '.. w U) J N m co 1 E -0 E c a ❑ m w w .L r z > 0 U) ai m m '5 u) u) O < 6 N 0 N w a ,, cc Y O E c ai cc E c HT H 2 O z d 2 w —N C N `Ni) >� N '' a) Q Z Y w U 5 H ❑ 0 U t > H ❑ C Q (w O O III O Q' J J w w m ❑ C7 Z Q ❑ C7 w 2 a Qco Z w U Y co (] w — U U) CC w w o Y _-° o w O m CI w w I D .. w LU .� 2 O CO I CO Z W 'O < < O 2 2 N O O CD O o U Z w a a O w a' N o J U) 17Cw. Cl) Cl) 1.--: F U a ,- N N- w = a' LY Z' m W z E O CD 1.11 M❑ o W U Z ai E 0 a Nm w ZwO a T to mm IZI1a ` w�. 6 E d mai U w .. cIEHCo a �) o >' ai T aZa° > T o 0 w C "" r w azHA H N H N- UO N a O .ff > O E E w 7° -5 LTa "O Y w N a Ya) -O N V O O O oUaw U O D U cc '5 Y al ia.- (7) cO 2 7 LL n a OC7 o 0 0 0 0 N U o ton .0.0 n a o N O O a N O) d 7 _ Q m a - a) LL o To- o NI- nn � � � E_ d o O E E U E N U Fo a - 2 9. .- g co in O 112 U �v > ja > aeric U L E u) tv 7 - z Z aU 0 O O 2 d N d t0 N C d n O L - a) _ o d . a >.. o 0 U y o 0. o m o m m 0 ~ N rn O N F� �- rnv a> E a > > E m o Z in m ai o ca.I= � ' ' w m E E -c N . o d N H U O 0) E c a Z U c ' H nC cOV ucC O Z `-) V) 6 a = O r J W • a) n LL C@ Ce O Q X d v) L j n E c ° ti O E a)` �. U n N (A E , 2,-,T,2 c a H m = E a= ° 2 Cn a m £ Z z V C a 7n OL7 ._. . Z Na N _ a) o N > N E LL °Na O CO d O d a m a) o u) h - 5 CO «) N c d E .. .. s. 'O IP- a Q. a o) L d in E _ d c c ° 5 t a- C _ Q W Q! O E C d C m n .O :9 a N N d d a a) m a O E E a E > t .7) F- a 0 C y Q m Cr) v d m in r O > .2 a ti -° d v v = a) O N E 3 a U ~ a Z F- U o E 2 .. m U E T.: m W o ci oa > E X 8 .__ g 2 o of o m 6=. N 0 cn 1 u0) N 0 N CO m a d a m E 3 U . c E 3 a) C U ��I N 7 > n" n o) fn U S O - = ix S Q T_ } O O Z ZH a o ,- >- U a) o N O ,- o CO O o oOar a o .. 2 N th co Z• v (P m v) o E O n U N N H a'.'. S a) a1 a °-., -j a d U N n tin .-. C0 CO E a 7 -- 2 H z ?. a 0z LL n o a) �_ P. O) V ` _ U (h to O w 'a ¢ O U a) E a.2 ? N _... . N -Es! o a X ca. � H t m o E 2 �) co O a <`') O J N E v E o0 0. - co. d `o LL U_. O N a to O a) o E 2 m m N C- X Cr .O C y C) 7 O) a) a H p a) 7 0 O �o ti H O 2 m o 3 d o d d - H- M > _N to E r) d LL . to N Q O _o Z N co- a W r) z O U O C M o CC a o 7 E a ) @ O 7 -- �a al r. LU • 3 al 0 > a a o a 2E O: 0 o U > z z z co = LL N o •C C T o u) z a F oo E at m rn- O J oo H Z ol M ro) 0 o a _ d w } c v) 1• d a' Y n N 2 a Z ▪ N �. fn U O el } o. V tD O W O - L c. To -o o c 2 o ¢ aao 7 ~ • • T J c o E m aa a a d m = 2o a a .. I- o O H y LL a o d E m o v d Zw d O •c o .O > O T O CL d ce N a a' a n a O a w O 7 H (n c w E m c o w o y 0 H F U 0 0 CO 0 m H 2 1n b0 IP v NiGJ N � `os _' � U U > Xs m d s Y L L C 13,0 0:5 4C) i— N N CO C O L C 0. .O H 0 ITi T (6 fC T C. Qp 0 CO V 0.c C p -c) E L Lc t U y, 03 W W� E "OLC C f0 C. GJ `W 0' r �' C co N Q _ Q 8v m �{ 3 7 d o10 yTi Fey W. �I�� LL N N ctr ft C N L U Q , L L pp C CO 0 O TA N E 'O w Q +-, N O C 41 CA O- Q .o co C O) 0 u a 0 u CO W J y s > v >- 1...: d' 0_ W .� L w .. W I LL N aU N t U 2 2 Ct i 6 H F H Q +_+ N C w- O . O O Z E 6' v O w 0 0fl- N +' -O Ucd LL c o n ap g 2 it c M CU CU c C o V < v r u > co U_ .1it a O v CD Q • E' O U CD N N' ` gcl o W, d m 0i0 CD W Z Z 2 C] a, ,aco � ' moo 01 Q Q.) x > (13 di m J \\ 4 zap . OP , 0 0 a 0 0 J Q W33 � U � 3 a) CO r� > 2 2 N WroC to >' mows cc, ,fit X vi 0 LSPr r r W m CO CO O WI;iiiir 0' 2 2 =2 E 6/ Q oc _Z 0 0 0nDD C v CO t4 a a a C o UL N O T N u COit 0 C• Q U CC 0 0 0 on O > W.. Q Q O .- -6 a z 0: Y Y Q L m W V) 0'. N M O C L M 3 v Oa w e a I` O m Q� w H rn v CO I— V) Y E v .5 o LCM zai J Q 0LI 0 Q`.. CO U Q CC C F m Z; N O — , 9 N 3 y Z Q M �; U 2 X .Y E v ES +. = z Q N W` E z N- U m . o N 33 Ful Z 50 ea 0 v O y a N Q m N a n. m 10 ip N NCI 15 u mmmmN 2mN24 ^22 m^mmN 4^N M p. �^t N 'O� ^22 AQONmT 3^222 4MM rM43. ?SASS M N m ^ NNnPm m eStS W Oma2Grr NlOt01mO1m0 W nFAr rnoA.20.110 INO4NOb NagE m CD C y p M4y.y.M ,}�{ M MMM�{{.. I'.yMy pm.MyMI.> MMM.,, M,,M,, a 3 m,33mA aA AA W 4m W e0a404Te40 mmeDa4A O4m4m,3.0 mOE40.ma Q t03e40 W 333 M N8 m m m.....mmmm oiMoiaiao .emma6ao mmmeu mmmm a ® a a a a 4 4 a a a a , 4 4 4 4 4 4 4 4 a 4 4 4 a ,VV,4 a a a a n O 1111M; OriA.bN Mil lN'1 NN Nm�gN4p EMI ROM.; Q'M ppn4�N 4D n ON.NM Y/�s r rnAn � r VOi�n V '40014- � 1.. 1`tl�hl- W1-44 `1��nAO. I�nf�l�m illi O _J ''d''''',.1." m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m N N222 NN mm 22 22 222p. m mmwm p1 mm p�22 NNNN ryN WI' X{NryNN ryryiyryN Nryryryry NNNNry NNNN to 0 0 0 0 0 0 0 O O O C O O tJ O O C 0 0 0 0 0 O O O O N 2 0 0 0 0 C C O O h r r 1�h n r A A A r A A n r A A A A n r r A n r r r PPPPP A A n r r A a 10 Cr C OOoNN m.o.ov.D eONNWO 2000..0, 2r.,, *..,.. .r0,010mr ...O.DN. . 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 22 22222 2 2 2 2 2 2 .I O.A m 2.2 S0 m m m m m m m m m. 21=1 W N.V yN N N 4� pN p N N 4 N N p N p N p pN p N N p N pN o N p N N �N{y N N N y N 4N N N y N N N N N N 3333 33333 33333 333$3 33333 33333 22.40.0.40 (401403.40 2 m0000o 2 m m0 4 OXNOO2020 V 22YP.r M V 2•y r NN1tmb2N 722222 mmm22 mmrmr2mm2m22222 2222% p2A0tj qNn ��(pyyy 10.p�0.pO1010�p 22222 0�0.010�0 000m01p010 no....p 00000 000p 00200 0002120 22222 22222 2222„ 22222 222O2I22 .202Y2102f2 m.ON m. ..m Tmhmm h ow...N ....20 50:22g4 0 Q 0 4 O1 M O N o V m m 4 m pp�� ♦♦ O o 2 h 0 O m 0 2 N N H h 003ry r r Nr r O 000 ONr N NNONO OOp 401 ^m 0....... 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r^O O ^O M 2 N^ r m r N r T.0 2 m N O m m m m 2 m A .O^^2 .128; 'Y 00009 g4.o.n4 ^m m^. O 00 0004 2h mp .-.20.0022 0 Oq � � � � i•SStiO �� 00000 OCOO. .-Cf NO' NmNN b ro pppp m e� .0 q i t. z SOOOOO 00�N VM', OOh PO OOSNYm] 0200.92 Y]OMNQ O�V V M 02 0 W U .x L o0000 0099Ct . 7 7N IV NI�I.7' Oslo.. 00000 ^V2uiN te�'102p O 4i c 2 J z. 2 U .E c p m z m f OOON Qr.010N 20,01.0.0 N.").70a40 Tro4m4m Ndddb2 OOmoNl „NON m �C o o N h 4 m p S&842S g C O' G�OOOOO . ^.: . N NNNN^ ^O 00 Oddd., Nol OWN M4V.0 = 0. o ..e .. m m N . , o E r==• $• .N E. Ng U O z zzm x c go .remonox�m ,0 Y$n� d oe 4".2Oho U' g'Y • rc mar^o.o m�mt-o3 oz ooQQ��amp �1pp pp�� .04 ..00 .pq 4=00000 O V.10mN PAPT2 b O.fab0 4 N C4 a TCC2; Nm MN 40000 a 00000 ^ .-.-N NMM44 .l1.... uir,. . mmWeOpj O"122 aNN2 O y y 2 . L Si c O 2. a O M Y h u Nd g qpE i t s at C ��C m & Q O0 W C 2q v I m.." u2.R fpm(y p�Q1 pp 1pp C C C.Y C A�.E u C Y U s OOT 2TTS2 S4O m0 N M n N1�e20.Om a.N..12 N.339-0. N3d 2.0 ✓ ,0.. . . .a, - .4 z- y C 2 y W 0 0 v 0 0 0 .,i .; ..-, 1.J /� C C yS� �`yY Y 6O 0 `�E ; COGRR gOR00 G.-.-�N NNNN^ OORRR RRRRQ ROI eY�� ly l?t�q G! C N N u u S O a O O 2 M a u Y C it.S t O yp�A&I S S a b 4 ` 2 0 e O i O l Z 6 3 0• in w» c�$�c�r =82222 22taep2222222t2 tt22mi.o.00 i,1-; SSAVR m At-P O 01' 828 ppO2p0VOO �O0pM . N ii mNN NNW.. 000 0000 n(y N 4nmN N.-2201111 hAnnn AAAr . rhrhr hhn.�h '1'.: r 2.4Nm N.NT .00i oi22a;Yi Oioi220 am Oi20i am... Oi0i..m ...Ow m..N 7 r I I I .- ..... nm....- N M:N 2 2 2 0^ N...t; 2 r m 2 0 = 41 ^ r ---.. N NNNN N NNN M mm.. W N . M 4.0 p •.0.�p0 Y S,,O m m N O O r 0 ^ m ^ ^ ?1,W4 O.m p nmry ;.0010100, Tgflmr 2;:qPig. A0.20 00m,N1'!g .')200 C o 1- OONm 14NV 1A4V m.4Y^ V A g402 11612'S q IT1.4'1.A'lMlr .r V.O-.4-O '"NNN N�OaAmi ?S"m e z 3 =a3w Cl. .-244M ''T o 1. o 3 O A :-.P,2 .1'-A N M n0O m AryNNN0. 1,;21:122 doO 4 eNN�A 2 A 0 4j N 4N 6o006 00000 6.066 oo0o0 00000 o0oop . (4M..1:. ouu.: ✓ >� g. Nom cm= C N i F.2 M UNo.s *. a= 2Sab = ma .. •-mo , iifn=- 2zzz.:o.. RxOmmMW3Mb 2.22 O^m mm22NMm�2 2m1MOmO VQm m2.10 000 02pONN0 y000 o2m00011OM .OTCA O Sp 400 pp2m$ O .0 .om02 . commit.: O . 4NNNSANS' NN�MM OyyMM ayy RT Y O Q .lxC . c mT r• fa 411/::› u �p D 2 2 . .m.-- -,2 c e 9 u- 4 T __ o Ca F• , tp, C CQ5rya {g�C7T t C $3 C K U ll.W i nQTW10-UJ JU< > U 1^� C Om 0 e r V r .2 Y M 0 01 P O b d^ .2 A.. mrNOO .08 0.Y o ✓ rwa cow. 080 ` no. M. m _�NQ MN ▪ O 8...W 22122 o^'AO ^.-00O^G22 00220 Y'282 P. .C8 ^8o:13p V';428mr�WANt710M0 Bm2'A2b01w1•07 NN.4 C H ONNN VNNNN YmN AA. M.00 N2p . pp1 ...§. ..www J .4 2PW2 m.mZp VWdm mmdd m.4.4tlm brob22 22.m. 2222 22222mm222 222W2 22222 mNA v P PCC O 10444 OC0C.: 00444 P 0 tl C a v o C COO< V C Y 44044 O0aCa tt4t4 00104 v a . r .N(• r y. r r r 1p• ppr r • • • • r 1•p • • • • • • • • •N• r r p• •pr • r(•p . • r • r • •111pppp• r fpr • r • • • • • r . • 9 m sp�M1ppiE0 W r%r.§ 021.00 AO pAqp�1 amOi pmp 82.YA1000 mRI2 V V oa 2^O .7-8220 r2'3•.M 0r OT2 V_O2t2�A C9pV 8 V 2 m m 010. 0 NN.VV 0^.12.4PA n.2m.w Ww... .4080. �.221V10 n;EngOm 2802 AAAbb mQN^ 8m�wm roAA00 W m m W 201 .mmmm .p.m.m 0122 W. mmmmy mm Ommm www.* 0.... mA 9 rNNcs' ggfe, 0..01 .m ..22.4'1 m..mm 2012.°83 mm . rNn N N N N1•{�`INN .NNNN Nl�1V[4[y MN(yNN Nryryryry (y fy fyNN .NNNN ,NNNN .NNNN "'PI" ryas p� • P 0 0 0 A O O A A Op C 0 0 0 0 A A 0 0 A P O O O O O O O n A AAA A A A 0 0 0 O O O 0^A 0 A 0 A �- Om2N2NNHH co pt0 V22N. 2qq.122 22bN2pmgl010 22222 2:1'288 CmrNN q.7-71Apr 22828 bOWNN 2mAP;' OmONM p N 8 AI:.8N 01^NNNNb01ppnmmN monoOyYNN 0N ▪ N NNNNmNmN* ENN** NNN . N02. .A... NOV.. HHNNN .NNNN I maam mNNma bQsmm smmma mmmm2 mamas mama seam ssmsb bW♦y.4 IZIZo CWb 22120. Ymmrm8:=82 '41.4A2 02100 rAYmHA OngNh 88222 02020 10220 88:12 .ONYA O 0 MNti 8qY18 m1"; O•O mr/1mN NN1Ohg ZN• :MEM0iq 82800 88.8088EgOOOd< angpp o000 00000 ppsaran N inr8O i•i]vmi i qpmbhB qq82mmm20m0q2m0101222818222 22222 N 122 22222 W AH0W82 WNbM .d8^8 2V0p0 R22PA 22P22NmONN 8P422 2,1.1.87,q,ry < GGOd HY<MO dMM1�Y20VNN 00000 ooNC7 <D.NG HM•-YN 0000 oN•qp 1Ln ^.43tMry YI Yb1,0 V Od1, NO.4.O 1m+1MrOm M08.1ADt2n P V228 12pry.2�,ti0 180OmPN 1211,2[;28 21.2222 ®Nm f0 21Np8♦mA 2 N NY^A N^tlA 821+ .4.0820. N^2 A20 2^Obd 8t V TA 012+1<V 0 44'4'82 8..112.11 .N08i0Vmi 22(1211.22( N NN2H d dY M N .I A 1(01G 00.1 ^ 7Y774 4 °P 4`P 1 1 • . . W Cp Z ::::: NQNN :::: , NCDO W .. 722O22 , .2 AOm'PM ::::: :::: 2 :::: ::::: ::::: ' 11 :::: '1* U flm 0222,` ::::: m p .4A . 02PmOrn 82042 '4142, N8820802W2 Hdddp218b. Cm. 8OON0 H tlYP.2 8. 28882 28Z8b A O a ( =t°‘ 28822 2W.1mHN :=;221A ^2.Q 2Z2 V 2 :=282P-. 82:222 22 0 V b0N 82.02 80 PY 0 2CP2V 22182 2t�12N22 2N P .V42. 00CW2 .6... 00Cr.:8884fN% 2 ---vv CONNA PH81P.80m 7:.0120 $ -.NM 2:2Y2 22N22 20202 8.2VVN 2btl^%Nmmo.mm C T CO .• p=dory gUn2Ni; mgi,lmga2 CI.N0 CO•CCO,.2n mnrymo )0 a.ill rlo c8m120,rN- oym�iy r1no1%i�i � ow.2n .82282 o O Cl�.11pp. MfA2i. 8 g2/1P b14188A p01.-8 221p2": .2b.-N 080001 I-21((8.11 6�m .- M0AIC O 1q f�1�02 1AOMQ A01N.A NH b..^ 00 N^ . 1tl111N110mA g717%. N.- 014 NNh" NNMnO P 2 • ,�(VNN ,17171? '3477 7777477 4411712}' 1?S17 `77177': G �y 10 1p m .0 I-A V Om1pp 120 2.4,0'4(.42 mr Ol�m 28222 V i.1-V 0.8- bO8222 :=g22^ 00010021 hO0i0Y Y NOIR mO. bt29�g0ph0 Aq Y.o 0 `P W r 00102D 2N rOr 1202 V 01 tAp�1Npp1.- NOnNN NONibON.�p r.W W 00 WNN: S1{wm{�V2 V Ay. lbr 12000. •2f1 ry� M1i 2 M 17117/888 M I= aeQdtl OYYPP 22 81188 mb8mm 81120 88811 12222 bm1AA AgArP Nxh 210200.'4 OrAnP .2010�0p. 08,201! H020N�N 1r� r N020m01`{ N.P.�-r0 2201{y 011Y8p1 *. 1,1* y YLp2D,@O. p ONhNr 2O n 2822 EtpP228 OANMd 828'422 02.0072 28548 n4m2mD gO <bbM1@ N.4001. bpOYN mp r�.O.dO rNOiDO . M MMM102 102222 PPPPP OPPPd YHm2121 . m bNi0M2 N m 102121 wwwww .bwer AMAIN-A LiA F0EI�., .1 0A�.N^.^^Od O,N ...NY ..NY pry:<N m N .0.WN Vt7 0 00 Y 2 .MICU). .4.442 PO4.p4...-.-. 200. .4 9 2 20 d 0222 20024 m 644. .m. . NmN.4 .+ AS 88988 2 22 22288 NNN NNN NNNNN NNNNN NMNNN NNNNNNNNN 2 8 HHb01dH ^Mmm A.'W 280^A A 2y Ntl01 002.2 rym1[11^20 WASON ON... 000142.1 NNeW'Ini OWO ONA.O C W PA 2rmAry Y^Q^l1f O?Q 1p 01 .•0�08H ^NO^ ,.'0Q. a 1r� 1� 1�1� 1y ^'2201 '4'4822 YI eUNmry 220122 4AY 44000 04144 C112'll'1ng 9212222 8cT.P.NN 222.4t'f M2C'fM2 17 ✓ NNMM C9AC 2 O 82228 87822P .APO♦I pp- 111d.��.A-11'41100p910 00400 m1M. N{A�yry28h 2222V dvvw� 22OW� 2081.00 22(f2882 qqN pp2�N�AV10� y8 A AAii2V ss... 8021.10 )02010 CN.mN 2412810 22180122 122%22 888PP tiAMPr I�AI�rA AWbWm I 6 N1 .4(2222 M NAO P 4221"4 YQ PP2 2b. Cl r- II c 2 O m U F 4 0 11- m- Ob mO•N m0 O mN O ,Lm' G m S AmN b�A 2 b E N nV N W 2E O W O p2 M E0M S A O2 2 W G22°42 n N N 2 a!2N O ...NO 2NN dE0.-7TQ NOW,. Nm L m0 m ONY .N App NOWN.. M0. 2bNM NOV.,. p. NA OpWON CNMIV 202V. fm < _ 02 .N ..222 2m O2 O tmmmON 200N Q 44 002Nh .hN22p 32222 0010001 01222VNVNYNf.7,3O22T J =wow mWWmmWr80o0W mmmmmWmm2mWmWm mmmmm 11110 W0Wmm 10221 mmmW 444P PVPPP <POQO PPPPP 122PP POPPP PPPPP PPPPP PPPPP PPPPP PPPPP PPPPP PPPP Y• mNN N0on dmmEM1m200 id0E71 MON l2'42E28 Om mNNNM ONlPQbNN e 0022'" NO2121m24_2VOy v^g2.,72O28PM222 2V8=2 22mo .m72 9 2222222i OOa2 N2<ON Q,00N d<NN 2222 MNMN 2 2222 NO0ON 2NO88 NN22W mm2 2 �NNNN 2NNNN NNNryN ryryryNN .ryNN COCO rrCG COCnMnnrO CCOCO OCCOC ooC000 OOOCC Co000rr� An�OOAhOO t- rr A nnrr, nn . 0I Ivf bW W 201 W N1OpppO�. b NN2 2222^ Pam2b 2220W F.22'2 r2883 280NP202Em 2P1bVO S.2822 NONOP82•N MppVppWAO .O 2g.,8:741 W02 N MCOCC g4pr� t▪ MMMm i;-432q; V2QNN �4VP2 44222 .3..2 NNN0G mb0W nlmO MAGA 33331 mmmmx mmmSS sIs mmmmm mmmSS m117,333 mmm mmmmm ISSSm SSSSS SSSSS 1•A-1NO33 220222 r mPP 22028 '0GOPMO-WW 2'2EE 222'41 222322A222 S222.1 OM1OV0 S2822 rW O �0 O.-M 0010001 !;.:„.go o O�N M .NN . pE 2 .. WW2 2 N222 2Nt88m ..2 ..00mm2p2r2 .2222 2222221'4'3,1;2 2..t-12 ..m-l�12o 21';',2253 1l;`',2I�2lO x1p� 2mMp 2V2 ON. NNNN N . NNNNNNNNNWN . 1rWW.O N NNNNN 22201E NNNE•il 0.2.0. NNNNN NNNNN W... NW20 22.'2.26 N le2 22222 22224! 0224 22S20 24.1 22 =22 22m28 2222E 2O 2M S 0O0O0C ONCCp ONMO^ V '^ noon* Mo.-Wed mO�tO MIC`V 172 W •712,100.1 024.1x1.9.10 O�Y00 2102' hr V W O 21�V Om MgAl ap Vp A V N ":121209 1,2210.2, V 011 N V 1A�OG2N 021004 V O VESG Nm14P2m ppN^'A 23.2010 apm.lfm �bN QMI MM NNNNN NNNNN P34AV V000 OO�ra • ao •0.2.01 P .442V; O 24;;$4 Q 22mm MOm•mm MM M2 m M m __ _ QQ m 4TT Z c"10b Of 01-W V IONEp 0•92 4r!; 0.11 lyOM l'1O1V 1m 2,11(py113:22 Or.QrQ'h0 N NIN OA1apD n21��1+V11 0p02f.2.w0m m Y•00,12 A 001 l�l•1 U n•0O.Orr 00 V�N 1221 Q 00<O P .'!A22::vf x1b 112010-Im-N x00 WEOI 01 040OM IOOriN01 04ON 1 AA W Wm OEO V N Itt))17 V b • . . • • • • • • • . • • . • • • • • • • • • • • • • • • • N N N N N N • • • .N 0t N NNN N N U m gc2P21: 2.2222 A~422 222Mmr 87-VS2G2P2 2ZZrP2 mEViE G2.1:72 2 : 2 22nnao�r�s IvPaIoOn NAr "" CCrf20IA 2rmaget MVOmV 280P2 , �r2ANaA OmW. NX228 68o• N1N2 EPP 2221- NNNN 00 0.-NIle U ... NNNNmNN NNNNN NNNNN NNNNN NNNNN NmMMMMMNME 0 _ gANuOM11Or.1N ONNnN 21122V 322M(ryW N WVV pp MN NN.12 W 2T21;;mV1;; • A222421=1om222QO2vN oo^ 4mmNQ $rNxNN 20nCMM; MVyyyS2222 ppoppnn 21,6p1 mm�m� 272^ PP222 $ MS2P mM 2218 Mmmmm21mmm �dQP PPO.Q 22 "a dry C O �O m •p p m OVI?eA2ggSp1p ii0ip,pNQp�Q 2P22.V2 '42.1209,0 f+i�Y wl.lmO- VEr♦dNI1P •1OpE2202f�:1 2221oo (2122 ry8 annp�NMOtr x2-1101 Ag472r 201 lNp 1012 O • 2x• 2)•0 G ^BNE� EO�mm W w tr�2rN N NNNM04 072 V 01!• rl m 10 Mb 1D PP2222 G3ONN 172400 N2.Altpl Ll.gs 1oioddoSmpf1f<op V.F1 N N N N NNN N N NNN N N N N N 10 OM M m 2 e~'228 MS22 W 28E2 2.W 2PP FN V 2 2222'; 82i;72 Q2<V m tr O2W 2NOOrV • 'gpANONANd14am^ 208+ 21020 W 01222242 P2'112 G224,!2 3g:IAP2 2t721022A274 OA2D2i22 A- -- 2SS22 mW2WW 2E222 OAOAmgb m101.W mmo2 2E222 22`22 Wrm2oW 22.%mO 222.7;2 O22c%b y'XN01�0 OD.�m1ppm MI'•2y mlp 0!•200212- rfl OMOl m 2- 20010,20 OVO1p(Np ESS pW 801 pMl NpNNa 0Q1dp,0 NN1oQMVIN ONVOV 021 yn N2r • N8mI..011mp0 vg-vg0NyHOt4g001 NObl 101- a V MPd f2-1222 48000OO OGOO §' f�22 V° r2p•4,1.2,(20 .3 2. 21220???IPO •dp V 1220 N NW... 1(0 2 2m W W W W W W 0 0 0 0 ..... W W W W W m W W W m W W 00 1 W m 2 110 00 2 Q W mm ~2• terry.- M1114.4 pmMW N 22120 1:-.W i•1:=V 21°222 2x218 (YO W a NON 2f • ObF2 EEEEG WE+22bEE107 P121P .' 22220 WbbpE EEPAI020102 ATSEp SSVGS ES382 VE22 0 ".111'IF N2A •I.-. GI,NO 0202:14;"• N 22120 12.1W4 22E2 MNMMM MMtim$ 3221-.1 22L-IS2GP012222Ep 20222 80000 00000 02222 222001E WWWW g=2OW2p 1O1mm( Y1n«1A0,702V 28 20QOW1 M02ry0A0,0 IW f2NNmO22101212.13N 2.1"14 09 E02N rop0mONNtrVO OA2NgggPw2iW 20Wm120,E 80000 0000Egan- 2GG00 'NNNmWNO C 8 Ec Ol £ ^c 0 a u a S Ovvy .,. .MA. NN ..pr.N ....- 9 ME428 480p2 ;32P8 00T4 OmMAN O N NrmNm2 _ d P . mGtilmrtPbm 0Gmr[1 8442.; J 4 44420 44,444 44444 2 .444 44444 m Q Q P V M 41444 44444 414:11 44444 a n 1. zs a• mYI Nt80EO�iN 1tlON 0010 Nnoi 00000. O a 9 m 0m.6mmmA2 NNN °0 ArEA.2m NaromAmm p„.„,O N N N N N N N N N N N N N N N N N N N ry N N o O M O O C O O O C 0 0 0 0 0 M 0 0 0 0 0 0 0 0 0 T' POP-00 AArrr rnrn rArrr OAPAP t0 € 2 2.8so12 y 2.4288 • 24-:426 6 .".4G8?,q r:.m1Aa<22o nION1IO 6Edav N1N' P'8:m �m16on72 W N .8888 NNNNN N N.oN N N N N p, N N N 12. mldISI 1M1$1$1I1a 0.000 0ZIZ.d0 Imb10 P r 2WVVNm.o ..... r .m M.2 d m cl/ mm1ltym0 pa .-MN DNmmr YmdMM L m O m O N r Oiffpp n .3-4M0.- M M.- m.-ri. NO3 ✓ '-g& m _.-m '62 -228 W0 A q0Rm2., 8228p8 2222 22222 . ..A2. mmmmm 6mm .. O .... 008888. . 0.. !..Om8.v .Y 10 mOAmN 8,2278 72284 ;82V2 V48G2 0O fJ V'.I VICOMOi CM 00.20 OI Md.A N.mrO {1��1 11pp mm m It 11111 A�o ,ti,".3,Q m8 tM Nlp Z-1 7.-1 m Nr M�O V N^.rn O Ut.IUU Y Y P 0)mPmmm 11' YOMm ormN A2 a 4 2.M 6°'"m ONgMc =I ap.'-7'7" r'4'M 4477N R ?444 m7� ?N NNN7.7 ggi..1 if 2SN NO1, OO2MV YNNA.O�O. :mm�Y x2. 0 m 0 mm MO rMA4 Nppb2 .-8M Amm O M g rMm 8 82 88 O 2NNNN N NNM aa mm . f 717"171'1 17474 44444 44444 44774 0000 •,. Owmu� >e 6thhto CYYMo Mmho0 nmm7m .1mMm1-y Ym1.�mQ i2 8 21. ~ •600Qc0.m 0 g 0MVmM gO0o0 M8AN2N .NM0m !MNOm - mU `y _ U rM MMmmO p007d QQOQN QNNNN ONNMM 0 rr rr m GC12 Wels.Nm vj,sgz mfir.. Ma.bn �ppmNV -.0000000V� 000N8 O1Q • O 4m.-r2. vdV4(1366,6. OsAm 2N2MM O ▪ 1 .. OVED n7 "N ';" ri444E4b ...mm .mmmm .822.• Ymmmm m.mm Oein 1 C Y , yy4 O n V p v to 802 022Ah 221211AG 20'888 otbrtn4 Nm,Pp?22 ,1'2882448 t \" 0 Q reiS m8M08 Mm.zM QMNOm 0MnOm 0-..11...-,-.- !IIo . m 80NM n m l2•'1 d d 11x00 Mm R^N a1 C O E O 111--- 0 mE. m1p.Mno� w gd U) loco amca aa! rs55SbSb5 C A t O'ayUU • M onoN aJN NN- N-2 ,l..cy�1r.W.m.. nMa�.aMal ....... {: L c 'a P ClmnCU i,aaarw- arr Arrrr r�nrr D 3333333 0 0 i20 F m mm2 mmmmm o.2mmm mmmmm mmmmm p aaaaaaa Q N 4 c W N 3 M• � ›. co , 0 sK 2 gX10 �A8=Y m=1;:!rg. 88742 OP- Po %272 2 mo0000 22821'42 6 el do , , � ��Annn'Zmro28' 2 ti.o29g2" 12Trigg2 ° � m2lCO 0 {{��JJ fpm o _pppp rc�m 222 mrt611db °?..,QOQ MNN00 nir+001Q 02810. o § 28g2N20 20w f 410,21-02 Nm10M M8888 V1-V" .M1-QO e EO 1O B..Q O QM1a � Lt-g;,1, 0 2.d Mfz0_1 'E rL 1i11 1Z tV4; U1 r O �1 Q 4 4 N m t ii 1• 4 �pp�Nypp p S mm, N t 8 1 14 Sgga2.m W4.200.0 VAS2112 0t;IV-41A0 v80r`r2. Y . u_ b 2 EAOm22r2 2222222 28222 22G22 22222 r 0. -.0 d ft N «11.0 N an LL gXq ry1N41r'1,.4 6-287V P,RV24 v ,WiVg48 3 mnnagm'mm „7.,g;4" D1`nang,.,N' LE x o N NNN8 8NNNN NNNNN M NNNN N 80M m. .- O 2. C2 r N. It ' c C u o 4 4 oF ,w \\V/7/',, THE STATE AJiarj:La C ii. d tea_ , F ire T A 77 AV, C,{`- `7` Is \' 1 ___ _ 333 West Seventh Avenue > Anchorage Alaska 99501-3572 �- _'�� GOVERNOR SEAN, 1 ,1RI�EI_L 9 Moen 907 279 1433 Qjn�* sip, 9C7 7.1 Mary Endacott Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU H-19C BP Exploration(Alaska), Inc. Permit No: 214-055 Surface Location: 590' FNL, 1735' FEL, SEC. 21, Ti 1N, R13E, UM Bottomhole Location: 4878' FNL, 1845' FEL, SEC. 21, T11N, R13E, UM Dear Ms. Endacott: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy P. 'oerster Chair DATED this S day of May, 2014. STATE OF ALASKA , • ALA; ..)IL AND GAS CONSERVATION COMM )N L . , 'Ll PERMIT TO DRILL 20 AAC 25.005 AOGCC 1 a.Type of work. lb.Proposed Well Class: ®Development Oil 0 Service-Winj ®Single Zone' 1 c.Specify if well is proposed for: 0 Drill . 0 Lateral 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 Coalbed Gas 0 Gas Hydrates ®Redrill 0 Reentry 0 Exploratory 0 Service-WAG 0 Service-Disp 0 Geothermal 0 Shale Gas 2.Operator Name: 5 Bond ®Blanket 0 Single Well 11 Well Name and Number BP Exploration (Alaska) Inc. Bond No 6194193 ` PBU H-19C' 3. Address 6.Proposed Depth: 12.Field/Pool(s) P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 13050' ' TVD 8725' ' Prudhoe Bay/Prudhoe Bay' 4a Location of Well(Governmental Section). 7 Property Designation(Lease Number): Surface. ADL 028284 590' FNL, 1735'FEL, Sec.21,T11N, R13E, UM ' - Top of Productive Horizon: 8 Land Use Permit 13 Approximate Spud Date: 3484' FNL,2826' FEL, Sec.21,T11N, R13E, UM May 10,2014 • Total Depth 9 Acres in Property: 14.Distance to Nearest Property: 4878' FNL, 1845' FEL, Sec.21,T11N, R13E, UM' 2560 • % ( 74..c A7) y,z-1, ((71 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 85.18' ' feet 15 Distance to Nearest Well Open Surface. x 642839• y-5960189' Zone- ASP4 GL Elevation above MSL: 43.08' • feet to Same Pool: ‘, At, 16.Deviated Wells: Kickoff Depth: 3330' feet • 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) ' ii•Ze-/&" Maximum Hole Angle: 104 • degrees Downhole: 3236 • Surface: 2360 • 18. Casing Program Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 8-1/2" 7" 26# L-80 Vamrop HC 6490' 3150' 3149' 9640' 8667' 229 sx Class'G' 6-1/8" 4-1/2" _ 12.6# 13Cr85/L-80 HydriI521 3570' 9480' 8545' 13050' 8725' Uncemented Solid/Slotted Liner w/Swell Packers 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD(ft). Plugs(measured): Effective Depth MD(ft). Effective Depth TVD(ft): Junk(measured) 12899' 9010' 10299',Unknown(TOC), 11017',Unknown,12650' i t asn. 1,aan• 12830' 9006' Casing Length Size Cement Volume MD TVD Conductor/Structural 110' 20"x 30" 8 cu yd 110' 110' Surface 2615' 13-3/8" 3720 cu ft 40'-2655' 40'-2655' Intermediate 10564' 9-5/8" 1647 cu ft 36'- 10600' 36'-8465' Production Liner 327' 7" 420 cu ft 10356'- 10683' 8308'-8520' Liner 2588' 2-7/8" 117 cu ft 10308'- 12896' 8278'-9010' Perforation Depth MD(ft): 12150'- 12810' Perforation Depth TVD(ft): 9017'-9005' 20.Attachments: ®Property Plat ®BOP Sketch ® Drilling Program ❑Time vs Depth Plot ❑Shallow Hazard Analysis 0 Diverter Sketch 0 Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative. Date 22. I hereby certify that the foregoing is true and correct: Contact Jacob Thompson,564-5579 Printed Name Mary Endacott Title Engineering Team Leader Email Jacob.Thompson@bp.com Signature L-fa, , dmiz,zetcePhone 564-4388 Date 4/23A 1/_ 1Commission Use Only Permit To Drill f / , .API Number: Permit Apr�al at: See cover letter for Number: L1.-G 50-029-20883-03-00 I other requirements: Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas V contained shales: Other: �. t� �d 5 � Samples Req'd. es No Mud Log Req'd: ❑ es [r7 No P fes J�5 H2S Measures: Yes ❑,No Directional Survey Req'd: Yes ❑Alo Spacing exception req'd: ❑Yes No inclination-only svy Req'd: ❑YesLENo APPROVED BY0_4. 6,1 APPROVED BY 5-5"--1 Y.� COMMISSIONER THE COMMISSION Date / Form 10-401 Revised F /5/2//p €3nhis laGfirIVAIT from the date of approval(20 AAC 25.005( s�gjt�r�,and Attachments Ij`P�eei 0+00 40. Well Name: H-19C Well Type: Producer Current Status: Oil Producer Shut-In Request: P&A-Well Prep f/Rotary Sidetrack CMIT-TxIA Failed to 2500 psi (3/4/14) MIT-OA passed to 2000 psi (3/4/14) Well History: H-19 was originally drilled in 1983 as a Z2 producer. The well was completed with 7" x 5- 1/2" tubing and a 7" liner. The well had a RWO in 1987 to remove the 7" x 5-1/2" tubing and straddle pack assembly and replace it with a 5-1/2" tubing string w/5 gas lift mandrels. H-19 produced until it was SI for high GOR. Due to the bottom hole location being close to a series of faults, the likelihood of a successful gas shut off was low. So, H-19 was plugged back and prepared for sidetracking to the H-19A Z2 location in August 1997. Severe lost circulation during the CTD resulted in suspension of H-19A, and the well was plugged back to 100' above the whipstock @ 10,805' MD. The well was then coil sidetracked to the H-19B location in July 1998 and completed with a 2-7/8" liner. H-19B initial production rates came in -2500 bopd, but quickly fell to -1000 bopd. Gas production remained constant until a step change in 2004 when gas rate increased to over 40MMscf/d. The well was shut-in from 2006-2007 for high GOR. The well was then POP'd and cycled for over a year. Reason for P&A/RST: An organoseal job to s/o gas was performed, and during the post-squeezecrete milling job on 1/13, CT inadvertently sidetracked the liner at 11,017' MD. Due to the hole in the liner, the well has no value to base management, so it has remained SI. The well was secured with a WRP on 03/04/2013 in preparation for pre-rig integrity screening, and the WRP was left downhole as it will likely be utilized during the P&A. H-19C PTD Page 1 4/22/2014 Planned Well Summary Well H-19C Well Producer Target Sag River Type Objective H-19B API Number: 50-029-20883-02 Current Status Shut-In' Estimated Start Date: May 10th, 2014 Time to Complete: 38 Days Surface Northing Easting Offsets TRS Location 5960189' 642839' 590' FNL / 1735' EEL' 11N 13E sec 21 • Tie in Northing Easting TVDss Offsets TRS (Sidetrack 5960222 642856 3118.2 558' FNL / 1717' FEL 11N 13E sec 21 point) Northing Easting TVDss Offsets TRS Production 5957275 641810 8643' 3484' FNL /2826' FEL 11N 13E sec 21 Tgt BHL 5955900 642820 8640' 4878' FNL / 1845' FEL' 11N 13E sec 21 Planned KOP: 3330' MD/3248' TVDss Planned TD: 13,050 MD/8640' TVDss Rig: Doyon 25 BF-RT: 40.8 RTE (ref MSL): 85.18 - Directional — Schlumberger(P7) KOP: 3336' MD Maximum Hole Angle: -43° in the 8-1/2" intermediate section -105° in the 6-1/8" production section Close Approach Wells: H-11, H-22A Survey Program: 104.9 - 3,211' - BOSS-GYRO 3,211' -3,300' - BOSS-GYRO 3,300' -3,800'-GYD-GC-MS Gyrodata Gyrocompass M/S 3,800' -6,150'- MWD 3,800' -9,630'- MWD + IFR + MS 9,630' - 11,130'- MWD 9,630' -13,050' - MWD + IFR + MS • Nearest Property Line: 21765' to nearest property line. , Nearest Well within Pool: 50' `. ` .4„ /u//c �/ / /47/ C1 � H-19C PTD Page 2 4/22/2014 Formation Tops & Pore Pressure Estimate (SOR) Estimated Minimum Most Likely Maximum Depth Fluid Formation Formation Top Pore Pressure Pore Pressure Pore Pressure Uncertainty Type (TVDss) (EMW ppg) (EMW ppg) (EMW ppg) (+/-ND ft) (for sands) GI* -360 8.4 8.4 8.5 +/-20'* SV6* -1640 8.4 8.4 8.5 +/-20'* BPRF -1920 8.4 8.4 8.5 +/-20'* SV5 -2330 8.4 8.4 8.5 +/-20'* water/brine SV4 -2535 8.4 8.4 8.5 +/-20'* water/brine SV3 -3040 8.4 8.4 8.5 +/-20'* water/brine Preliminary KOP @ 3336' -3242 8.4 8.4 8.5 +/-20'* water/brine MD • SV2 -3255 8.4 8.4 8.5 +/-20'* water/brine SV1 -3550 8.4 8.7 ✓ 9.2 +/-20' water/brine UG4 -4015 8.4 9.0 / 9.2 +/-25' water/brine UG4A -4050 8.4 9.0 9.2 +/-25' water/brine UG3 -4305 8.4 9.5 9.6 +/-50' water/brine UG1 -4725 8.4 9.5 9.6 +/-75' water/brine WS2 -5212 8.4 8.8 / 9.0 +/-30' water/brine WS1 -5430 8.4 8.8 / 9.4 +/-30' water/brine CM3 -5655 8.7 9.3 / 9.5 +/-30' CM2 -6105 9.2 9.8 / 10.5 +/-50' CM1 -6600 9.2 9.8 10.5 +/-75' THRZ -6950 9.4 9.8 10.5 +/-35' LCU/TKNG -7207 9.6 9.6 / 9.9 +/-35' TJG -7300 9.6 9.6 9.9 +/-35' TJF -7645 9.6 9.6 9.9 +/-35' TJE -7800 9.6 9.6 9.9 +/-35' TJD -8060 9.6 9.6 9.9 +/-35' TJC -8250 9.6 9.6 10.5 +/-35' TJB -8418 9.6 9.6 10.5 +/-35' TJA -8483 9.6 9.6 10.5 +/-35' TSGR -8578 5.0 7.1 / 7.2 +/-35' Oil/Gas TSHU -8612 5.0 7.1 9.8 +/-35' TSAD -8699 5.0 7.1 7.1 +/-35' Gas/Oil/Water Casing/Tubing Program Hole Liner/ Wt/Ft Grade Conn Length Top Bottom Size Tbg O.D. MD/TVDss MD/TVDss 8-1/2" 7" 26# L-80 VaHC°p 6490' 3150' 9640' /8582' 6-1/8" 4 '/2" 12.6# 1 Hydril 3570' 9480' / 8460' 13,050/8640' /L- 80/L-80 521 Tubing 4 '/2" 12.6# 13$R- VamTop 9360' Surface 9360' /8340' H-19C PTD Page 3 4/23/2014 Mud Program Intermediate Mud Properties: LSND 8-1/2" hole section Depth Interval Density (ppg PV YP API FL HTHP FL MBT PH Window Milling 9.6 10-18 26-30 <8 NA <18 9-10 KOP-CM2' 9.6-10.0 10-18 18-26 <8 NA <20 9-10 CM2 -TD 10.2-10.6 • 10-18 18-26 <4 <10 <20 9-10 *NOTE: 10.6 ppg MW is needed for Kingak Stability Production Mud Properties: Reservoir Drill-In Fluid 6-1/8" hole section Depth Interval Density PV YP LSRV API FL pH MBT (PP9) 7" Csg Shoe to TD 8.5 - 8.8 <12 10-20 > 15,000 < 10 9.5-10.5 < 4 Logging Program 8-1/2" Intermediate: Sample Catchers-as required by Geology Drilling: Dir/GR/Res Open Hole: None Cased Hole: Contingency USIT in cement evaluation mode from the 7" shoe to TOC to evaluate cement in the event something goes wrong on the cement job. 6-1/8" Production: Sample Catchers-as required by Geology Drilling: Dir/GR/ Res/ Neu /Den I MicroRES Open Hole: None Cased Hole: None Cement Program Casing Size 7" 26#, L-80 VAM TOP HC, Intermediate Casing Basis: Lead:N/A Tail: 85' of shoe track + Annular volume from 7" shoe to 1500' MD above with 30% excess. Total Cement Spacer -30 bbls of Viscosified Spacer weighted to -12.0 ppg (Mud Push II) Volume: Lead N/A Tail 47.3 bbls, 265.6 cuft, 228.9 sks 15.8 lb/gal Class G - 1.16 cuft/sk Temp BHST 215° F H-19C PTD Page 4 4/22/2014 Surface and Anti-Collision Issues Surface Shut-in Wells: No wells require shut in for surface close proximity. • Close Approach Shut-in Wells: H-11 and H-22A fail Major Risk. A TCR will be filled out for each to determine action to be taken to eliminate any and all HSE risks.] �,61 wry tit ` /noperablt- w ,A-/ 5 517//a rt``d6 flvi`/ cr �a( deep fry ply, Above/alb-cr.-3" /741 " 4-- Faults H_244 : Sfftonrwd lruhoVrCallisfif u�d ll be S/ 5�� Formation Where Encounter Fault MD Intersect TVDss Intersect Throw Direction Uncertainty Lost Circ and Magnitude Potential Fault 1 -Kingak 8,053 -7,095 SW, 10-20' +/-200'M.D. Low Fault 3-Ivishak 10,005 -8,790 South,50-70' +/-150'M.D. Medium Fault 4-Shublik 10,750 -8,696 North, 30-45' +/-150'M.D. Medium Fault 5-Sag 11,585 -8,655 North,5-15' +/-150'M.D. Low River Drilling Waste Disposal • There is no annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul Class I waste to DS-04 and/or Pad 3 for disposal / Contact the GPB Environmental Advisors (659-5893) f/guidance. Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3500 psi. BOP regular test frequency will be 14 days during drilling phase and 7 days during sundry operations. Intermediate Interval Maximum anticipated BHP 3167 psi @ TSag at 8578' TVDss (7.1 ppg EMW) Maximum surface pressure 2310 psi (.10 psi/ft gas gradient to surface) -25.2 bbls with 13.6 ppg frac gradient, and 50.1 bbls with 12.51 frac Kick tolerance gradient. Assuming an 7.7 ppg pore pressure in the Sag River and 10.6 ppg MW. Planned BOP test pressure Rams test to 3500 psi/250 psi. Annular test to 3500 psi /250 psi 7" Casing 3500 psi surface pressure Integrity Test—8-1/2" hole LOT after drilling 20'-50' from middle of window 7" Casing The VBRs will be changed to 7" rams to accommodate the 7" casing string. H-19C PTD Page 5 4/22/2014 • Production Interval j Maximum anticipated BHP 3236 psi @ Ivishak at 8764' TVDss (7.1 ppg EMW) • Maximum surface pressure 2360 psi (.10 psi/ft gas gradient to surface) ✓ Kick tolerance - Infinite with 8.78 ppg frac gradient, assuming an 7.7 ppg pore pressure in the Ivishak and 8.5 ppg MW. Planned BOP test pressure Rams test to 3500 psi/250 psi. Annular test to 3500 psi/250 psi Integrity Test-6-1/8" hole FIT after drilling 20'-50' of new hole Planned completion fluids Seawater/6.8 ppg Diesel Proposed Pre-rig prep work: (scheduled to begin April 21st, 2014) 1.) PPOT & Check LDS 2.) Pull GLM #1 at 10115' MD 3.) Full bore P&A well with 103 bbls of 15.8G cement. 4.) Drift and tag TOC 5.) OMIT TxIA to 3500 psi 6.) Jet Cut tubing at -3600' MD 7.) OMIT TxIA to 3500 psi 8.) Install TWC, function LDS install Dry Hole Tree. Planned Rig Work: (scheduled to begin June 10th, 2014) 1. MI/RU Doyon 25. ' 2. Nipple down tree. Nipple up BOPE and test to 250 psi low/3500 psi high. 3. Pull TWC - 4. RU and pull the 5-1/2" 17#tubing from the pre-rig jet cut at-3600' MD. 5. PU 8-1/2" clean-out assembly and RIH to clean-out 9-5/8" casing to top tubing stub at-3600' MD. 6. RU E-line and set EZSV at -3336' MD for whipstock. 7. PU and RIH with 9-5/8" Baker bottom-trip anchor whipstock assembly and 8.5" window milling assembly (to include full gauge string mills). RIH to the top of the EZSV. Orient and set the whipstock. Shear off the whipstock. 8. MU 8-1/2" intermediate hole BHA (GR/RES/PWD) and Drill to TD in the TSGR. Short trip. RIH to TD. - POOH lay down drilling assembly. 9. Change out to 7" casing rams and test to 250 psi low/ 3500 psi high. 10. RU, run and cement 7" Liner. Test casing to 250 psi low/3500 psi high 11. MU 6-1/8" production hole BHA (GR/RES/Neu/Den/microscope) and drill production hole to TD in Sag River. 12. RU and run 4-1/2" Slotted/Solid production liner with water swell packers. Test Liner top packer to 250 psi low/3500 psi high 13. RU and Run 4-1/2" completion, circulate corrosion inhibitor, drop ball and rod and set packer, test tubing and IA to 250 psi low/3500 psi high. 14. Shear GLM install, freeze protect, set TWO test to 250 psi low/3500 psi high. 15. ND BOP, NU tree test to 250 psi low/3500 psi high. 16. RDMO. Post Rig Work 1 Install tree, pull TWO 2 Pull the ball and rod / RHC plug from landing nipple below the production packer. 3 Set GLM, and pull DGLF. 4. Negative pressure test production packer. H-19C PTD Page 6 4/22/2014 H-19C Drilling Critical Issues POST THIS NOTICE IN THE DOGHOUSE I. Well Control / Reservoir Pressures: A. Intermediate Hole: Sag River is expected to be an 7.1 ppg EMW. II. Lost Circulation A. There are many instances of instability and losses thru the Kingak for wells at H-pad. Monitor drilling parameter to identify instability ensure ECDs are minimized with good hole cleaning practices and ECD management to reduce the likelihood of inducing fractures. B. Almost all Sag River wells have experienced lost circulation in the Production Hole section, and many H-Pad offset wells have had high rates of losses. Ill. Faults • Fault 1 is intersected in the Kingak formation at —8,053' MD with —10-20' of through. There is a low risk of lost circulation however there is an increased chance of wellbore instability to the wellbores orientation to the fault. Watch for signs of instability prior to crossing the fault. • Fault 3 is intersected in the Ivishak at —10,005' MD. It has a medium risk of lost circulation and a large throw of 50-70'. The Drill Ahead LCM pill should be prepaired prior to crossing. • Fault 4 is intersected in the Shublik at 10,750' MD and also has a medium risk of lost circulation. Its throw is 35-45' however if it is substantially less the DLS in the revert may need to be increased in order to not exit the Sag River. • Fault 5 is to be intersected in the Sag River at 11,578' and has a surprisingly low chance of lost circulation. It's throw is estimated to be 5-15' which could possibly fault into Shublik. IV. Integrity Testing Test Point Test Depth Test type EMW(lb/gal) 9-5/8— window 20'-50' from the 9-5/8" window LOT 12.51 ppg 7" shoe 20'-50' from the 7" shoe FIT 9.5 ppg minimum VI. Hydrogen Sulfide DS2 is considered an H2S pad. Recent H2S data from the pad is as follows: Well Name H2S Level Reading Date Comments Parent Well(if sidetrack) N/A N/A N/A N/A #1 Closest SHL Well H2S H-26 20 ppm 7/31/2013 Ivishak Level #2 Closest SHL Well H2S H-25 10 ppm 5/19/2013 Ivishak Level #1 Closest BHL Well H2S H-22A 60 ppm 3/25/2012 Ivishak Level #2 Closest BHL Well H2S H-34 15 ppm 11/11/2004 Ivishak Level #3 Closest BHL Well H2S H-02B 42 ppm 4/16/2012 Ivishak Level #4 Closest BHL Well H2S H-06 24 ppm 1/31/2012 Sag/Ivishak Level Max. Recorded H2S on H-22A 180 ppm 4/11/2001 Ivishak Pad/Facility Other Relevant H2S Data The well that makes H-pad a H2S pad is in the fault block we will be (H2S alarms from rigs,etc.) drilling, but is perfd in the Ivishak. VII. Anti-Collision Issues H-11 and H-22A all fail Major Risk. A TCR will be filled out for each to determine action to be taken to eliminate any and all HSE risks. CONSULT THE H PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. H-19C PTD Page 7 4/22/2014 M 0 ,- 0;7.. ,o.-Nn mnMO00 00 O MN r h O0) N N-O OON T m 0� m0(n300 O00 m0 ^0) ) - m M 47. Po lg 6666(60 (MO(60(m0rm MOmmomO rm(p0h V N0mON W V.Op) 0 000 m m m m m m m Co m m m m m m m m m Co r N-r N- CO m M(0 W NNNNN NNNNN NNNNN NNNNN NNNNN N N N N (0.666(06QQ6 )0 0)000((000 0(000000 ((0)0)0((0 V..4-...4-,4, 000 ((0 ((000(0 6 0000( 0 M 0 M Q Q N (V M Q _ 010 0oMNNNmm.- 00M 0. 7npp .-N , 00O ) OmO 00. OmpC2, pim mOON.0 m^ m NQOnM 06n6NrOp N p ^NNp0nO Mmm MPVO Vmmm0 00op NN NNNNM 01mmmm QQppQ Q6000 pp000 Op000 Op000 000p0 OOp0 00 N Z mmmmm mmmmm mmmmm m m mmm mmmmm m m m 0 Q m Os W m O)D)O)m m O)O)m 0)m 000)00) 000)00 m m m0 O) h u)m 0 N u, m V)N m m N u)N m N m N ,,m m m m N N m N u) N M N-m m Q ,mom, M h N In N Q N o m 0 N Q n m .4',-,N O 0 hu)nm W mm,-NQ Nu)(-m 0000,- 7NNMM Q(n N)n 0.0S .-o N N N N N.V M M(N 6 6 M M 6 6,i.,:,, r Q V 444 Q V Q V p O u E O (/) ... 00.3404) OmMmm Nin0mN NN h(n(n (n m h(nN N0N0 _ g p N Z Q N O N N N N NNNNN NNNNN NNNNN NNN N Om .. n N 66666 (7(.jM6(7 66666 66666 6666 • LL• J(n J J J J J J J J J J J J J _.,_,_1, D ~ MMmQ2 mW'-N(mO NMMn0{p OWnh0 0)0.0 tom NrmWM m az .L Y l0 N N N .t Q M N M o O m^ 6,!;446 Q M M M N N C m N LJ J p E 22 22 6 67 m m d d E pmN�-r(m0N 0.2- ",?(VO' g:Tr r,A ,932! r(n (P0 E, p O p�mNN66666 N NVV N0NN, .mV 6,-,,,i U ad E OM M VN VM (rM0 QmQF n o O d d d N m NSE o 77q"1, d E o o r m m m 2 M 0 .-M Z o m 2 0 m mCeVIm �> S2 Om .- .0 Lco , FON m0mNM (h,mho 3-('N-N - MMmm0 mmpOm Mmmp 0 Z.- N,-mm(NQhn0)0) , -,NN mm( mN mn00,- m,-mm 0 ` OOt0p66Om0Oo OQ00) WN NMQ 600 NNQr c,,¢..,6 OnNNm MMN =0 ,- NNNN NMM M a L Z rn W/ L OI y O = LL o LN c tE CO pFO 0 m5c ° aV EEd CN LdC Ou 0 W 0 c c O W o C d▪ LL C d C d eZ w > O y y Od m U ^pNm Q p' QQ N MQ ti Q mt`m 0) 10030N, OrN _ NMmuM mmMM mmqp ` ONhOn 6u Q OJUUC C0 VNOCO ` 9 > ONoo- ,e 760)A7jOmMr OO66 ' NN(?v ,p n 0 ^6 6,h6 nM00) Q(nmm O O N N w W O ON O > O . . . , , NNNNN NN M(7 (h M(hM al • _v q ppT U U C s C C L("1 V q C CYC00 o a3 000 ;; Nru 0 0'o.d. (0 (• o w» 621-01- 202z01-_1 p (p O Q 0 F mm V r� N��ON N�W Qm NO9m(n (m0(^0^�V N'Sc..? p Q Nt 666,:6 6OmM6 66 666 NO O uj()'i m6666 Q Mo O L 0 mO OmM 000)0.4 omm3-NNMMmMVmMmM,M ”,- Nn) . c.M W,Co 2( CMMMM M ppQ QQ,QQ QQQp IL N O a iv MOONMM OO0. pp-(VQ 0ppM QmOm N .7mOp o O 0 uOONOVp0O666pCO67666VMN00 ' 66m MM.s 0 N NO NN NNMQm NOmm, mOppO COeN(yMQ MO,, (hM(h elMMMM MMMMM MMppQ COpQQ CO a Q p r13 d 1 , ,t mill N (0 n '0 M 7 M D n 0: m,O m m m m m m M M m m(O ,-3-0.,..0 M m m O m CO M m QO ^ pM0 O COO nMMmm mpmr.- Openm< ON.-40,- Wm rmNMOp 1- M K r N r N`N\N m 6 N^mODN-QO h N N O n On,-mqL . O ONNN.- QM N N( 6666r. I'N m m CLN N¢ 0 1ENy M M M m m M M N N N N N N N N d N Q a OO -a3 W - d N- nN � mV. • • ° N mm,MN00,,-NM �V N {ppr- N m m0ME � -' CO W .- OpNh0oou0) 0 0 7 0) O Q (00 y 0 - O u1 m m m 66.-46 0)0(6(O(n COU) 66666 (n m� O .(4 N,- m Q m (O m m m m m ... r m r N N N N M m N o 0 2 O m N . Q` m M c.i (N ° o o N N Q N 00 • Nst m N W V¢ a OU) N DU)= 0 0 n m m A Q 00 0. 2 2 2 m 2 Q N Z Z Z.-ON ' 0= 00000 03,000 00)000 00 N m 0 00000 000.- mN 0)0 0 O p 0 0 0 01,1000 00N,0 000,00 000w 66¢66 66000 66666 O O N 6 O 66666 6OOp N 6000 6p000 00mm0 00 00 0000E dl NNM MmMV COVQV<OOd OMMMN(NN ,mm Qpp CO COQOp "'TIT., O C M o w j( u Q K Y 5 O W d C 01• N. J 0 N -QQ .mOow c9 u- pwZyL la 6 .. OK :SGmli wmO ' J75Vda mZOSdCc9m-omay °°owL m11 ad2C o u y5 L d- d d00. 770000LL0 dE Y O U�O (0) :1C1 n ( nt LU E v5 n o0) o dod O (N°Z ¢ pCO •C 7 UOm C5m83m4mNFVJJ00> 0 O O P F m Y. 0. 0 co 0 - N pMO O�0W0 —.7c-'22S 88,88,18P-' 1)42S; (Op 0 N8OVO0N0R0 Oh g 2 ,';WO,gp N08A6 o pW m. , Q Mir. 0N000 � 0COCO NNCNCmm000NN mom NCONON Q apRORV a W N Q )Na D DUUVvoM NNNNN NNN(N0) MMMQQ QQ U .0ww N N NNNy V VVVVQ VVQVV OVVVV VVVVV QVVVV QVVQQ QQQQ.* 'U QV QVQVV QVVQV 2 40 mm40mt0 04D0mm 4040(040(0 (0(040(040 00000 0(0(000 00000 00 0 00 00000 00000 CI- V V V N _ V H ^ 0 M 0 N 0 0 N N m C- m N Q {7 40 0 (N 0 4 0 0 2'4224 0 0 (0 0 40 N V NON q 0 d.m Q 6(6.-66 6666N 66 e4 o4 cso666 cod66d cv (0 (0 0?N O n0 400 aDN O)(0OU) qOf� N MM�N0 OQ r O N40N U)(O(?Om 0 Egg o O O SO00 00000 00000 00000 m W o000 00000 m 0 m NN00m0) Dm mmD co mm 2nD mOD00DC00 O MMM N Z (0 0(0(0(00 (0(0(0(0(0 (0(0(0(00 0 0 0 0(0 00000 U)m m U)U) U)I n 1 n hq Ipn� Ipn�0040 U)U)U)U)m (t)U) U)U) V 0 00000 00000 0000a 00000 00000 040 m aO( 0)O+(,((O 0h 0 h0 O0h0N Ooomo N 000(0U) 00 U)0(0 U)CC)U)U)U) 000)0 U) (00000 U)0U)U)U) U)0 f1 M 00,-N0 0 0 m NO mN N 0M 00 0 400 0,-V00 e.,-M00 7 6 0 0 00,- 000M0 01\ 000 1\ 00m 0 0000 V V 000O (0 nC` 00M000 NNNN NMMM VVVV U)N0 00000 0(0m000N(�n000000 EV VVVVa4U6UU00U66 66666 UUUUU6U6U6 66666 66666 60666 60660 ui G (D 0 yyg N NNNNp p ONNN NNNN NNNNN NNNNN NNNOO 88888 88888 OupCU0880 8 0 p 6 MMMC'p NOo,MM rimm )C; 66666 66666 66666 NNNNN 00 O NO NoiNe4N njNN(yN u.,-- _. CJ- NJOIeJ-=[0 (ON(JO0N 0UJ)0 W(0 OJ1m000JD OJ)mn(J')O .-0=(00) zzxzz u,x m com 45-4m6 JN.^m6= (mp m Fl 0 = =O 6(V-0 0 0 m(0 f N 0j(:(')(t pn 0 (7 1.O1 Q N C.V =_ _____ __ =V Q 4 t 7 M N NNN N N N N N 0)^N) NN Ns, .-0666 000100 00 N N(400 00 C d0000 NOON W K 00i, m.-N(n0N 00 N0 V V N(000N NNIN.W(p �N 0N(f] 064((10400 N0 MON O(NON N(M0 O (q(q Q`-NOP Q•5-0 NN- 0 V m�W Q RNh01(( ml�N(00n •-0000 pW(' 4.00{9{2pW{p 8(02p0 06(5�4Q9�2Q as N MNU CM(y -O 0p 000 0(00000(00 (ONNN!') n N ,7z11.1-. 000001— NNM Mp) 00(0(0 0N(0U)(() U)"'"'U)U) 0 V V Q V V V Q MM M MMM. (`1 MM MM d O) 0= 0 MN00 0 V 0r N 0000N 0000 600 006N0 0000N NN 0 0' V 0=0 .-M0)NN 0 Z U1,((N(OyON 0 00 V 0J0 OD(O Nm� i-NOS-C- N(0 X00y0 V 0000.- N U)OCN 0 MO 0 0(0 CO(�O((p00p(0mN .-ON O466 C. 0) C') o.0. 66.6 (OO N N N N 00 S^�O^(400 5 m d m((j Q N n-(Q O N r.. N N(N'() ,,,,;`,2,0 uU) O CND ONI O N M M a c Q •Q(N 0(O N N 0 000 t 0 Q a 3 () O N m O 1 m 0 C N N O V(0 0 000.00 1 O N m m 0,0.-OW N 0 m N U) 0 )0 0 0 M N Q M N M m 0 o NNMNN QO W C N 0 N00N MNM W 00�NOOCf mi Um�((ppp6N 400m(0O q .-dUo U)0.-66 QO U 0q NNN fO OOOQ0 Cm(N Cm'�]N ln'()MN ...coo (0'8)6(73(400 NNN,...co 6 o,9) Y W ONmO NO(�i-DO 0061 Um) '(D NO40(MO V v�000 3 `-`-co M 6 0 0 co co 0 0 .—NNM ,V000 C 7 0 (pp p m (00 (400(60,NOf O OCOmU) 22c1:182 N.2 N 000 0(00003 031 ON 22222 6.d.-64 66666 66666 000 o0 t2p 0 (NC00 O2OON (NON((Nfl 0 mM 00''N (ryNN1NO 000,-O NM 00 CO(0-000 000N(N (m(`y N^�)`.)) 000 8 00 CONNN000 00008000 2 0^10000 M V.r6 Mo Oln 6 64.E.-6 V 0000() CC)0(0 mm 00000 00 00 0 0. m"" N O0 NmO O00M.- V0000 W 0 W NC- O V N N W z 0 0 0 0' 0 2 2 0 5 an 0•-00N '00 NON O VoC V 050 -0 ONOVV 0VOMO 000(0 00NWN h0 0 60 ,4 0 6O 66 ( 0066 o400OO4000OO ^N + •fO0(0N400WWN^ OmONO (0 M0OrNr0O 0 Q QVN 4666e- 60 O O 0 V CIV 00 oD 000 00000 00mm (0(0(0(0(0 0(0(00 40 0 40 0 t`N N t`N 0 0 a D 0 0 0 0 03.0000 00000 SrOm m 4060(0 800(000 M 000)0 0 W 0O) N60U)6 N 0000 00000 00 `-! 00 N m�OODA (p Cm0.((00((0(0 ► N 0 O M(00 80080010 V C0 V M M . (gj (Np(Op))U0j UUm)UU)Um1U V OONOQj �Oyi�.M1f-�O 001 W cd 3,330 C�C�NNN IAC.. NI.-- ^NANO NNNNN aE N NNNNN NN(14 NN NNNNN NNNNN NNN 2;- 2 N NNNn nN^00 N(Np e4�CD([j V N V Oln z3(4)O� 044000 00000 00 O OO S-O((NU)0 0(0)000 — A (a')44064 MV 4440 V vm)(O(70)0) (NN 'MNNN (00NN(MM N(NOf(Myo) (M7 PN(NN( PN(M7 (M+) m(M 66') (0))(n(O(00 NN00010 0 O O Q m0000 Q.-M V 0 S. 0 00 800000 00000 2 C o 0 0 o N M O o 0 0 0 0(D 0 0 0 0 0 0 0 0 o W Q0j N 4066 6O,Q0 00 006 �O�O pO So O m0000 MO m 00 h 0n N ('0 N (a mel fy SO6OO o00m6 66 666KN: 8 U m00 m0000 m(O LoU) U0)(O(000 ((000(40000(0 ((0000 On N NMN-0(NN- NO 300 00^0000 000) 0 O)0 00000000 aj 0000 0 M V 0 N N OU Q YO 0 C 0 Z GCA 8 > 0 u 2 N Z~ U) (0 2 rn 0E C N 2�66 N W V>> C9 lL W OU mQCaa/W¢¢��U' _ (QOry D C O W 0U 0 0 1=- .0. 18-18-1N-1---1�- 11-1-1-HN-U 1U- 1- 1i o24 W • CI 0 p (pp 00WMVO m C ^000)0 N,-n 00! (NO,(0000 N0MN0 O(0)(O0.-(8) ammOOI, 00 0) M O N 0 0) O0OCOD ((0 W O0i 00 V moo .0000 O)0.N-N Mo0NN- nN d C m m m 10100mm 2.m,, nnnl�m mmmmm m NOm V Qmm 0m w aa��(( VVVVV VVVVNNNN 0NNNNN NN (0(0((( (0(0(0 ((0( 0(0(0(0(0 10(0001010 (O(O(D(OO 00100000 000000 ((00 VVVV VV 11 a v v N p o Op V C 0(00(•0),-am) pCq..0 u`S06D16-.-O co 00000 NV 60.60. 0010000 m0 Q 722640s.-:os( (y.r 6 0 �4�0 IG 01 N N•j 11(00p U N of rr N 0 x[)0 0 0 0 (0 0 _N L"C 000060 N00000 U) 10 V V O N N p)00 m0 0M N N. •-0000 OOO N 0 000 N(. NN N N N 66666 ,0000 00000 •-01.000 (000.00 m 10 N 2 IOU)u)m0 1()0 u)00 0101000 Nu)N 1()u) 00000 00000 00 0000mm m 0)0 0 m m m m m 0000 00000 00000 0 0 001000) 0000(0 0010101 0(0000 000()0 00000 00 Cd 0 00000 00000 000e'-. .'m mm 0N N Nm m m coo m V <V <D .0 .66666 (60(0(0(0 (0(00(00 046666 (000(0(0 66066 (0(0 d O u_ 0 0588888 p 888 88888 pp 888 88888 88888 88 03 00000 60$66 (00(0(00 (06060 60666 00000 060 LLa J JJJ(0 0 i j JJ 0_1_1_1_1 0Oaax 0_1_1_1_1 J JJ JJ 0 0000 000 ~.. N-N = =W .7N = NVN ==NNO• = NU)VN-T. = xOOONUpy 0 . MV7ON m.-.-.- . . 0pp00 m 00000 mm0N000 oooim ,-� g b(0V NVN 3 (N� Q (y Gp �0 W 0 0 0 0 W C m OOIQN $'.8;',8 N V 0,�(60aN G NNr42V 0f6-N(Nom MC06iNo 02 IY OOmOM W Ofmcom 'QMmmmm Nw NON '-N00i V m OONM V V O NNNNN C4.-^'-'- 00 O0)m mT m 6 c4 tQ N '9L9vM N N'7 a i i 1 i 1 , 1 , i 1 1 i 1 1 i i U m m^ N N O 6 0 m 0 m V (01,100V Mm,-,N I-O N,-1-. m 0(0. 0 0 0 0 0 0 62" 1()V(ON. oOo OGD N-O V N (00100) •-0.3.1.0 N U)NN V ON 0000 (p *10(000 NnrN ',28c9; N-(pGn 000 N 00 O0)N0 0) m O m g N N O p(0 I- O m 0 0 N 0 O N N N.-1 V Ig','-'4 V m m 0 N O 000•-el V 0(0(0 0 00,003 O N 0)M M O m m W 0 0,-.-NN N N EC/MVO = N NN(IC1 NNNNN NN(VNC1 N(7(r (j Or(j v YYVYY vY C00060M 0 0 0 10 6 0 0 2 0 0 0 0 = t Q a 01.7 .0.-m. V N-0(�V N O V V m 0/.4.00N 0.-000 (0 m O(0I- NO QO y) (0 0(0 0 0 m N m 01 . "-...1 U)O N N m q,°'-'0,0 �1n N N 0) V 0 y O)ap,Q0Q0) u)WQ�j'(p6 1110(0(N(<po Op)W.-m N0000 0000 V oO ONDmOm W (000NNNN NNNNN N(myNNO) NNNN(mo (m+)M V V V V V C n 0 (0 p pp 0 C Nm0(O7 ,O,...70.( W W A W m V.0)W.. N(-V 0'0 N.NN060 m7 0 "' u)vi10V r� 'U c cd.40E-0- O O m 0 0 (0(1)WOO V m m 6 0 N 0 M N N m(0 0 0006 NNNN (-100)0)0) 00(.0)V V V 0)0)0)0) NNNNN NN 0 6^6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 0 ` mmm m mmmmm mmmmm mmmmm mmmmm mmmmm mm a • yCoopN $ °0(0. 061000NOn000voOm000QO ( 6, 0D0041n0o0 , mmmmm (00(0 ($ ($mcS$i$ ���� 8820000 00000 00 • m n w mfg O^ 00. 00 0)0(.O 0000 01010 N0 0 0000 00 - ww D 2... 0 V(nc-m 0('moV 10 oO V (6 0o 0(6((06 mm000 (om(o o1•I(•JN(o foto Zmmw H 0000N �N(0 O O o 00 0 m0 0000 00 N ui h 66.-Mui 10 LCN I-(--00 oNwN 0000 0000 000Vm MNN•-0 00 Z - E ~2 ZH N N•-1-Z 031 - -1,-,-I.: 1Z J,-,-II- LLNN N y: 01I9 V mN (mN;Nn V V NNOr-,1-.,188m8 F�N O(V- 00(0 V 7o pp',=A2',;;U. 000000 gS000 00000 00000 00000 00000 mm '-`NN-V ,-,- ,.... ,-,- JN-0)m U_LL m O)m m LL • pop,- E4 m 0,- p p p C V N V .- 00(OTZ ,VO pp0p pOpN $010(0 pO N(^..O pp0�O N ON-O m N1-000 m 0000 .-OO) to CCS_ co MM O(0010 n0 m0O OO)O�O N N 1)(00606 6N(•00((00 1N00N00D0 00 t=i�FHmw m 00S 00 00000 O,-,-.- . NNNN NNNNN NM m0) .-0 O rn~ 0 O I- r) >A V Jm o N m 0) N p m 001 Or 2 0O 8 2w0 20 2 Eo N 0D ..0).00 (. Ota V Ooo0 0 Um o U O 2m c m2 sc 2 s c22 m c 2 rn 20 — 0 01- W ._0F 00 I- W LLO I- 00 I- W I- 0 • )48 by 0 Sciumherger Borehole: Well: Field: Structure: H-19C(P7) H-19 Prudhoe Bay Unit-WOA H-PAD Gravity&Magnetic Parameters Surface Location NAD27 Alaska State Plane,Zone 04,US Feet Miscellaneous Model: BGGM 2013 Dip:80.985° Date: 15-Jun-2014 Lat: N 70 17 55.51 Northing: 5960189DUS Grid Cony: 1.0891° Slot H-19 TVD ReP. Rotary Table(85.181 above MSL) Ma9Dec:19.888° FS: 57623.981nT Gravity FS: 1001.983m9n(9.50665 Based) Lon: W 148 50 35.43 Pasting: 642839RUS Scale Fact: 0.99992318 Plan:II-19C(P7) 0 1500 3000 4500 1338• 24990 Ti.In Survey 3000 3205 MO 3000 . 1111 1111._.?^'"!^'P�OCk .._.._.._.._.._.._.._._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.. SVS'(3346.iis iVfij_.._.._.._.._._. 3316 MD KOP Co 3.25100 3336 MD SVTi$ )._.._.._.._.._..!._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._..._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._...;.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.,_.._.._.._.._.._.._.._.._.._.._.._.. Cry 335100 3936 MD 1111. .. 1111..._.._.._.._.._.._.._..�.._.._.._.._.._.1111._.._.._.._.._.._.._.._.._.._.._._.._.._.._.._.._.._.._.._.._ . �.._.._..�_.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.:_.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.__._.._._._.._.__.._.._.._..__._._._..11 11._.._.._.._.._.._.._.._.._.._.._.. ENi 1893'i4'i15.TSl'30 .._..._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._...;.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.:-.._.._.._.._.._.._.._.._.._.._.._.. 4500 4500 UDT'(A51dY as_.._...._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._. .._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.. End 03 H-19 5316110 095Y(5197'i8Y001-"_. .._.._.._.._:._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._. .._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._._.._.._.._.._.._.._.._.._.._.._.._.. Co 3.25100 6146 MD c 6000 6000 CM1(Seas 1813/U).._.._.._.._.. ._r._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._..-.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.:_.._.._.._.._.._.._.._.._.._.._.._.. Enrico 7735110 Th53. .._.._.._.._.._.._:.__ .._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.:_.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._..,.`..._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._._.._.._.._.._.._.._.._.._.._.._.._.. 7500 7500 Tgt4 11241 MD To6 _.._.._.._.._.._.._.._.._.._.._._.._.._.._.._.._.._.._.._.._.._._.._.._.._.._.._.._.._.._.._.._.._.._.12530 _.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.. Yid MUT TO Cry 18100 End Cry Cry&100 End Cry 10394110 11033BO 1124 MD 12232 MD 12900 MD 1111_.._1._5.10._.._.._.._.._.. n_.._.._.._.._....-.._. .._._.._.._.._.._.._.._.._.._. ..-..-..-._.._.._.._...._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.. Y.di63�'i$'YJb._.._.._.._.._.._.._._.._.._.._.._.._.._.._.._.._.._. .Crz.51aD Cry 14100 E� TD 9651 MD 10382 MD 1OS15 AD .. 1111_.. .._.._._.._.._......_.. ._.._.._.._.. ._.._......_.._.._.._.._.._.._.._.._.. 1111_.._.. .._.._.._. .._12f9.MP._.._.._.._.._.._.._.._.._.._.._.. _.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._. .._...._.._.._.._.. 1111_.. .._.._.._.._.._.._.._.._..-... ris-nib) JR(8568-18 tib) L.{r.nt 7 .._..D....._.1:.................c..=__.._.._. .. 11-. .._.._......_.._.._.._.._.._.._.._.._ 9000 Ty11Sag End Cry End Cry 9000 9836 MD EM Ov ICO 0332 MD 11710110 H-19C P7 1030]MD 10106 MD 0300 7 118480 ( ) 18889 MD Tgt5 11707 MD 0 1500 3000 4500 Vertical Section(ft)Azim=170°Scale=1:400(ft)Origin=ON/-S,OE/-W by 0 Schlumberger Borehole: Well: Field: Structure: H-19C(P7) H-19 Prudhoe Bay Unit-WOA H-PAD Gravity S Magnetic Parameters Surface Location NA027 Alaska State Plane,Zone 04,US Feet Miscellaneous Model: BGGM 2013 Dip:80.985° Date: 15-Jun-2014 Lat: N 701755.51 Northing: 59601899US Grid Cony: 1.089r Slot: H-19 TVD Ret Rotary Table(85.18ft above MSL) MagDec:19.888° FS: 57823.981nT Gravity FS: 1001.963mgn(9.80885 Based) Lon: W 14850 35.43 Fasting: 642839RUS Scale Fact: 0.99992318 Plan:H-19C(P7) -2500 -2000 -1500 -1000 -500 0 500 1000 H-19 N End Cry 500 5316 MD 500 Cry 1100 6148 MD • Cry11W 3838 MD •, SOP Cry 1100 0 I 33313 MD 0 Bose Whipstock 133/8- 3316 MD 2669 MD Top WHpatack 3300 MD End Cr., re-In Survey 7735 MD 3205 MD • -500 -500 .19C Flt 1 Sag -1000 -1000 Tgl 1 Sag •-MD 100 9351 M• 1.1-10C Flt 2 Sag r cag �y -1500 �0D -1500 90 10107 MD Elk Cry 'i-. ,1 10108 MD p ,I I.1-19C F8 35eg . M o-2000 1WB9MD • -2000 d O ,' Tp 2 { 10394 MD 13535 0535 MD Z H-19C Flt 4 Seg Z Crv.100 2500 10880 ° ..3 NNW -2500 10669 • ;/'" Cry 6003 End 110033 MD 10932 • Tat 4 11241 MD -3000 Fad -3000 \iz�MD 1e85 D 11-18C FM SSeg -3500 5 -3500 11707 D EM Cry 20100 11710 D 12232 MD illo Tgl6End Cry2900 MD12530 MD 140004000 TD 13050 MD •4 H-19C(PTV -4500 -4500 11.19°Fk 75sg -2500 -2000 -1500 -1000 -500 0 500 1000 EW(ft)Scale=1:300(ft) 2 ti = o Project: Prudhoe Bay s 0 2°' ti 2 "b° Site: PB H Pad - 1, °c. S 291 ig r Val\` " 0 Well: H-19 sr•, vl '��,4`+�II:P�'!:6n aa�, • ,oa1,'. Wellbore: H-19C __ a ,�.i��3E3!�I�iiit�D.�l_�®o'1 9A �o p Design: Plan #7 H-19C ha N I ,40 �4'Y 4 ,,,_:41 a1►� hry J rn �•,N Ni X32 cm 9 Sp 1 v " 4 38 A s� t3 r�,�Q 300 - -�.<. _ i. • _ _.4, '‘Aq- ilk _..._.n� ��';. ��f f��`�q.Qpl 2 oF‘ m 42 v r313 :� �� v 43° 0 . ._.. , `� tire-444PWIF; !-'Milir /n 8 en tit'e2 300— �4 `° C w rn 'y �P ': A • �IL'� .! :..o -.N...R 4p,,,, IN 1, - .t,.: ,,.,,,, ii, ,... .,,,Alavl , dl'!600 � � „� '57111141121*. . .6., . - -.. -,, . N 76 �'U�a •c� ,r \iN-dee - x j 0yr? r 2 BI '�: ,,ty@N- -900 e� " ,1�81� ,." -1% 03,pW 8 _2cNp m :'•- .'• y�• ,.4 4 ;s-' a' �'o 1200 9, ,_� ` - 'N � —..-r. ,..1 rn `� 0� 2 • 1500 '__'1 m 1111WiillimM :=N_ GNAWroz‘ s'''':{.:e. III 34 Ill ibilAlrAditirlirial `9. 1 aoo �1111 :,. o 3s `6 O 4 . - allsozo i .' 90 J58p 0 2100- = t� `.-C- ' ?72 1o8 IrAiltiVrAVA1911111 IIIII gib; ` -'5' ME. Palk 1 A -2700A. .41 , AtAr - • ., - o 11719MAIIMIIMill 3000 -.. atiltraMilli i: .74(,, 0 IrIP,A, v/ ver/• 86 , o co- 74883300 90 78 1 06 3600 �� I *436,44 ` 80 SI ,86 \ \ 82 AL3 02/H_i i.'- ; g4 m -3900 r ,, oil z z 4200 =Ill �ir�1�_,__ -4500 �_ MI PIIII)9..r O -4800 Er 91409/PI-n 8 -5100 b j i I i i i i I 1 I I i i a i i i i i i I I I -30 -'0700 -2400 -2100 -1800 -1500 -1200 -900 -600 -300 0 300 600 900 1200 West(-)/East(+) (600 usft/in) Plan: Plan#7 H-19C (H-19/H-19C) • iii111 IN I ,00 IxoOo 6000 50 O r 00 wiec Geo Poly O JO 4 000 000 (''t 3000 6 _�00 2000 000 `''/�/,/, 0 \ 0 000 a 0 /000 00 10 0 Zo00 0° 11 00 O 00 '3000 O O 00 -4k000 4k000 COMPASS 5000.1 Build 61 4/22/2014 2:25 PM • Co ;a • SOHIO ALASKA PETROLEUM COMPANY WELLHEAD LOCATION DATA , 1) WELL H 19 2) Pad H Extension (21-11-13) 3) Wellhead Location 590 SNL, 1735 WEL x = 642839 y = 5,960,189 LAT. 70° 17' 55.52' LONG. 148° 50' 35.45" 4) Bearing of Gyro Marker S 82° 30' E ** (True) 5) Local Benchmark Elevation 42.50 (Mon H-1) Ft. AMSL 6) Top Edge of Cellar * 43.08 Ft. AMSL 7) Base Flange Elevation L-\L1 , ',) Ft. AMSL 8) Kelly Bushing Elevation Ft. AMSL * Base Flange and Kelly Bushing NOT Installed This Date. " Gyromark is the light pole at the S.W. corner of the electrical skid on the west edge of original Pad H. NOTES: 1) Items 1 and 2 should be filled in by the Drilling Supervisor on the rig when a new well spuds in. 2) The surveyor should fill in Items 3, 4, 5 and 6. 3) The completed form should be returned to Drilling Dept. for distribution. 4) The bearing of the Gyro Marker is required as a True, not a Magnetic bearing. 5) Base Flange and Kelly Bushing Elevations measured by the Drilling Supervisor; , COF..A�� CIRCULATION: Q• 5 11 ',co/ %.:47 % .;,,ly . 9 , District Field Engineer - 2 r*/ 49TH District Drilling Engineer/Drilling Engineer - 1 kg, Slope - to Rig for Posting - 2 �"" "'.i ''' : • � Well Record Clerk, Geology - 1 f a,;Edrvard . Patmer, �,o j Well Files No. LS 4575 •i� Engineering Associate, Drilling - Original t Fp ' Petroleum Engineering, SFO -1 <\pAiV�." �rfSSIONkN Ellen M. Miller ����NN`! it%V. /9, /9 — Date Oilfield Services, Alaska Schlumberger Drilling & Measurements Schlumberger 2525 Gambell, Suite 400 Anchorage,AK 99503 Tel (907) 273-1700 Fax(907) 561-8367 Tuesday April 22, 2014 Jacob Thompson PBU WOA H-19C (P7) BP Exploration (Alaska) Inc. Doyon 25 Close Approach Analysis We have examined the potential intersections of the subject well with all other potentially conflicting wells, according to the BPA Directional Survey handbook (BPA-D-004) dated 09/99. Method of analysis: 1. A list of wells to be analyzed is created in Compass by performing a global scan with an initial search radius of two hundred feet with an increment of one hundred feet for every one thousand feet of measured depth in the subject well. 2. Wells are analyzed using the Compass Anti-collision module (BP Company setup) with major risk safety factors applied. 3. All depths are relative to the planned well profile. Survey Program: Please see BP survey program on the anti-collision summary Survey Interval Intermediate hole: 1 per stand - 93 ft"# - Production hole: 1 per stand - 93 ft* * (except where planned or as-drilled doglegs are 5°/100' DLS or more; then survey every -30 ft across the interval, or per client request) # if a gyro is run, interval should be reduced if MWD surveys are clear of magnetic interference sooner than expected # Close Approach Analysis results: Under method (2), note: H-11 and H-22A fail the major risk. There are BP TCRW's in place to cover the exemption. There is potential to see magnetic interference from the planned KOP of 3300'md to±3800'md. A gyro single shot is planned to be run until good MWD can be attained. All data documenting these procedures is available for inspection at the Drilling & Measurements Drilling Engineering Center(DEC). Close Approach Drilling Aids to be provided: A drilling map and traveling cylinder plot will be provided. Checked by: Scott DeLapp 04/22/2014 -- o N _ - O N - - O _ -- O O _ -- O O Cl -- O as _ -- O O O) - C co 1;5 0 co 1 c7 � O - O o 7L. 0 _ r Q Q) 0 _ Q) = r) C U) I i - CCS Q) - o _ - U) _ C) -- o co 1 - - c V W - o O) _o co-a 0= a c0 00 = - ? CZ CZ \ - v ui- aic 0 3C - O U) C - co - O co 0 O u') O N O U) O it] O Ll) O t() O )I) O h co co N I!) V C C N N r (uullsn oG) uoileJedes alluao of ajluao BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well H-19 Project: Prudhoe Bay TVD Reference: H-19C D25 plan @ 85.18usft(D25 plan) Reference Site: PB H Pad MD Reference: H-19C D25 plan @ 85.18usft(D25 plan) Site Error: 0.00usft North Reference: True Reference Well: H-19 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore H-19C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan#7 H-19C Offset TVD Reference: Offset Datum Reference Plan#7 H-19C Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Interpolation Method: MD Interval 5.00usft Error Model: ISCWSA Depth Range: 3,211.05 to 13,049.93usft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,500.78usft Error Surface: Elliptical Conic Survey Tool Program Date 4/22/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 104.90 3,211.05 H-19 Srvy 1 BOSS-GYRO(H-19) BOSS-GYRO Sperry-Sun BOSS gyro multishot 3,211.05 3,300.00 Plan#7 H-19C(H-19C) BOSS-GYRO Sperry-Sun BOSS gyro multishot 3,300.00 3,800.00 Plan#7 H-19C(H-19C) GYD-GC-SS Gyrodata gyro single shots 3,800.00 6,300.00 Plan#7 H-19C(H-19C) MWD MWD-Standard 3,800.00 6,300.00 Plan#7 H-19C(H-19C) MWD+IFR+MS MWD+IFR+Multi Station 6,300.00 6,800.00 Plan#7 H-19C(H-19C) MWD MWD-Standard 3,800.00 6,800.00 Plan#7 H-19C(H-19C) MWD+IFR+MS MWD+IFR+Multi Station 6,800.00 7,300.00 Plan#7 H-19C(H-19C) MWD MWD-Standard 3,800.00 7,300.00 Plan#7 H-19C(H-19C) MWD+IFR+MS MWD+IFR+Multi Station 7,300.00 7,800.00 Plan#7 H-19C(H-19C) MWD MWD-Standard 3,800.00 7,800.00 Plan#7 H-19C(H-19C) MWD+IFR+MS MWD+IFR+Multi Station 7,800.00 8,300.00 Plan#7 H-19C(H-19C) MWD MWD-Standard 3,800.00 8,300.00 Plan#7 H-19C(H-19C) MWD+IFR+MS MWD+IFR+Multi Station 8,300.00 8,800.00 Plan#7 H-19C(H-19C) MWD MWD-Standard 3,800.00 8,800.00 Plan#7 H-19C(H-19C) MWD+IFR+MS MWD+IFR+Multi Station 8,800.00 9,200.00 Plan#7 H-19C(H-19C) MWD MWD-Standard 3,800.00 9,200.00 Plan#7 H-19C(H-19C) MWD+IFR+MS MIND+IFR+Multi Station 9,200.00 9,600.00 Plan#7 H-19C(H-19C) MWD MWD-Standard 3,800.00 9,600.00 Plan#7 H-19C(H-19C) MWD+IFR+MS MWD+IFR+Multi Station 9,600.00 11,100.00 Plan#7 H-19C(H-19C) MWD MWD-Standard 9,600.00 11,100.00 Plan#7 H-19C(H-19C) MWD+IFR+MS MWD+IFR+Multi Station 11,100.00 11,600.00 Plan#7 H-19C(H-19C) MWD MWD-Standard 9,600.00 11,600.00 Plan#7 H-19C(H-19C) MWD+IFR+MS MWD+IFR+Multi Station 11,600.00 12,100.00 Plan#7 H-19C(H-19C) MWD MWD-Standard 9,600.00 12,100.00 Plan#7 H-19C(H-19C) MWD+IFR+MS MWD+IFR+Multi Station 12,100.00 12,600.00 Plan#7 H-19C(H-19C) MWD MWD-Standard 9,600.00 12,600.00 Plan#7 H-19C(H-19C) MWD+IFR+MS MWD+IFR+Multi Station 12,600.00 13,049.93 Plan#7 H-19C(H-19C) MWD MWD-Standard 9,600.00 13,049.93 Plan#7 H-19C(H-19C) MWD+IFR+MS MWD+IFR+Multi Station 4/22/2014 2:09:42PM Page 2 of 5 COMPASS 5000.1 Build 61 • BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well H-19 Project: Prudhoe Bay ND Reference: H-19C D25 plan @ 85.18usft(D25 plan) Reference Site: PB H Pad MD Reference: H-19C D25 plan @ 85.18usft(D25 plan) Site Error: 0.00usft North Reference: True Reference Well: H-19 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore H-19C Database: EDM RSK-Alaska PROD-ANCP1 Reference Design: Plan#7 H-19C Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB H Pad H-02-H-02A-H-02A 13,047.21 12,065.00 159.58 107.70 85.34 Pass-Major Risk H-02-H-02APB1-H-02a wp15 13,049.93 11,970.00 181.86 110.76 105.48 Pass-Major Risk H-02-H-02APB1-H-02APB1 11,826.73 10,190.00 294.74 116.70 188.02 Pass-Major Risk H-02-H-02B-H-02B 12,968.74 9,970.00 202.56 94.27 111.43 Pass-Major Risk H-05-H-05-H-05 3,591.83 3,730.00 144.24 93.68 50.73 Pass-Major Risk H-05-H-05A-H-05A 3,592.72 3,740.00 144.36 93.68 50.83 Pass-Major Risk H-05-H-05B-H-05B 3,592.72 3,740.00 144.36 93.68 50.83 Pass-Major Risk H-06-H-06-H-06 3,211.62 3,190.00 481.24 50.44 430.80 Pass-Major Risk H-07-H-07-H-07 3,213.67 3,175.00 480.58 53.05 427.68 Pass-Major Risk H-07-H-07A-H-07A 3,213.67 3,175.00 480.58 53.05 427.68 Pass-Major Risk H-08-H-08-H-08 3,875.01 3,850.00 410.60 68.49 342.57 Pass-Major Risk H-09-H-09-H-09 11,767.10 9,135.00 907.94 123.78 793.10 Pass-Major Risk H-09-H-09A-Plan 8 11,767.10 9,135.00 907.94 123.99 792.89 Pass-Major Risk H-10-H-10-H-10 Out of range H-10-H-10A-H-1 OA 11,071.14 8,475.00 1,300.23 147.55 1,178.66 Pass-Major Risk H-10-H-10APB1-H-10APB1 11,069.97 9,020.00 1,078.85 154.05 927.79 Pass-Major Risk H-11-H-11-H-11„.s 8,945.89 8,455.00 125.06 67.14 63.90 Pass-Minor 1/200 , H-12-H-12-H-12 7,506.00 7,240.00 1,402.13 402.09 1,059.33 Pass-Major Risk H-15-H-15-H-15 3,300.00 3,560.00 762.52 102.95 659.48 Pass-Major Risk H-16-H-16-H-16 5,749.52 5,895.00 308.65 208.83 183.39 Pass-Major Risk H-16-H-16A-H-16A 5,749.52 5,895.00 308.65 208.72 183.50 Pass-Major Risk H-16-H-16APB1-H-16APB1 5,749.52 5,895.00 308.65 208.72 183.50 Pass-Major Risk H-16-H-16B-H-16B 5,749.52 5,895.00 308.65 208.72 183.50 Pass-Major Risk H-17-H-17-H-17 3,311.87 3,335.00 215.25 55.47 160.46 Pass-Major Risk H-17-H-17A-H-17A 3,311.87 3,335.00 215.25 55.47 160.46 Pass-Major Risk H-18-H-18-H-18 3,215.98 3,225.00 112.82 57.08 55.74 Pass-Major Risk H-19-H-19-H-19 3,314.90 3,310.00 0.22 4.84 -4.38 FAIL-Major Risk H-19-H-19A-H-19A 3,314.90 3,310.00 0.22 4.84 -4.38 FAIL-Major Risk H-19-H-19APB1-H-19APB1 3,314.90 3,310.00 0.22 4.84 -4.38 FAIL-Major Risk H-19-H-19APB2-H-19APB2 3,314.90 3,310.00 0.22 4.84 -4.38 FAIL-Major Risk H-19-H-19B-H-19B 3,314.90 3,310.00 0.22 4.84 -4.38 FAIL-Major Risk H-20-H-20-H-20 3,214.73 3,200.00 158.56 50.44 111.05 Pass-Major Risk H-21-H-21-H-21 3,690.27 3,670.00 424.03 50.79 373.30 Pass-Major Risk H-22-H-22-H-22 10,771.64 9,875.00 626.56 434.28 208.39 Pass-Major Risk H-22-H-22A-H-22A 11,441.62 10,530.00 156.30 66.66 95.63 Pass-Minor 1/200 H-24-H-24-H-24 7,042.63 6,830.00 162.70 106.33 70.72 Pass-Major Risk H-24-H-24A-H-24A 7,042.63 6,830.00 162.70 106.33 70.72 Pass-Major Risk H-25-H-25-H-25 3,214.69 3,215.00 94.62 47.13 47.90 Pass-Major Risk H-26-H-26-H-26 3,211.62 3,295.00 577.04 60.25 519.28 Pass-Major Risk H-27-H-27-H-27 3,212.00 3,240.00 605.23 57.68 549.98 Pass-Major Risk H-27-H-27A-H-27A 3,212.00 3,240.00 605.23 57.68 549.98 Pass-Major Risk H-30-H-30-H-30 3,211.05 3,500.00 439.51 60.62 390.24 Pass-Major Risk H-31-H-31-H-31 Out of range H-32-H-32-H-32 3,211.05 3,670.00 1,398.48 61.43 1,339.41 Pass-Major Risk H-33-H-33-H-33 3,296.73 3,290.00 441.82 46.10 395.88 Pass-Major Risk H-34-H-34-H-34 9,963.01 9,395.00 109.93 93.42 21.97 Pass-Major Risk H-35-H-35-H-35 3,211.05 3,210.00 861.49 55.34 815.08 Pass-Major Risk H-35-H-35A-Plan 2 3,211.05 3,210.00 861.49 55.26 815.36 Pass-Major Risk H-36-H-36-H-36 Out of range H-36-H-36A-H-36A Out of range H-37-H-37-H-37 Out of range H-37-H-37A-H-37A Out of range H-37-H-37APB1-H-37APB1 Out of range 4/22/2014 2:09:42PM Page 3 of 5 COMPASS 5000.1 Build 61 BP Anticollision Report Company: NorthAmerica-ALASKA-BP Local Co-ordinate Reference: Well H-19 Project: Prudhoe Bay TVD Reference: H-19C D25 plan©85.18usft(D25 plan) Reference Site: PB H Pad MD Reference: H-19C D25 plan @ 85.18usft(D25 plan) Site Error: O.00usft North Reference: True Reference Well: H-19 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at - 1.00 sigma Reference Wellbore H-19C Database: EDM RSK-Alaska PROD-ANCP1 Reference Design: Plan#7 H-19C Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB H Pad H-37-H-37L1-H-37L1 Out of range H-37-H-37L1 PB 1-H-37L1 PB1 Out of range H-37-H-37PB1-H-37PB1 Out of range H-38-H-38-H-38 3,211.05 3,670.00 873.89 65.67 817.71 Pass-Major Risk 4/22/2014 2:09'42PM Page 4 of 5 COMPASS 5000.1 Build 61 Project: Prudhoe Bay Site: PB H Pad Well: H-19 Wellbore: H-19C Design: Plan #7 H-19C From Colour To MD 0 3000 3000 3300 From 3000'md (300'md above planned KOP) -9700'md (7") Scan interal 25 ft 3300 3600 Scale 1 inch : 50ft 3600 3900 Some wells fail the major risk 3900 4300 TCRWs are in place See AC summary report for detailes 4300 4800 4800 - 4300 ,r 4300 6000 ry� 0 „: 6000 7000 ���= "ice✓ S . 7000 — 8000 ��"v�..••�i $,�' �..::,%? 188 8000 -- 9000 330 plG/••Ps�� W �t.• s':;r30 �P0V4 �♦• �1pirgliki6. 9000 10000 I�'i►►�s�� �=--'��� •'�%' 10000 - 11000 �!i�q rintrNsi4ftill „-,-41 i.6. � � � 11000 — 12000 m..�s•����lipiro 44w, 12000 _ 13100 — -d ` ` - ,r1*�li„iW.4.kal leia'f rOA_.a& ,� ; l 60 ---.- ........-.."...--..-•-.--....-......--..;e:..f.:.S.,.W-. ii..*p.i, :.-ice `� ® '' '.. gidvk4. i..,d,Aokir,rdAiraa4jinr Aep4rAp :ice\\; R�� � SNI 1117 \ kt1editr 49/ i ii �, A: #111% bai4Vail/Rair4111VAIIVAlf-4's 11011110111J4\i , : • �fi r a��®® ►oil +®„ 270 ., �®�>�1111111W �i�t���� \IV��► ? e®\�1--... so ply= ®1,�%�� • • I • 4a®i `'�'I t. 1, i :''��tgiliarS' .V 11�j�'p6�♦7: ,'��1► 1�� \`�\� I- 71r• /.f V%c�®� :Y ;��e.�100, ���atl t`P . �iiYe.. ;��' tl1.1 fiNA ��� . % r A°� 4'�L 7♦IY'�.t.4 1s6►�♦Ii,�i♦f l►• i � ♦ ♦E��S♦'�s\�� , yi yro,�111 � i���'�I � w.4-1,0t#401 i -Of < � 7 ��a--� ��,- _ 38� A �. h,►/�AIIe�Iw�: f ,� 4 iAil / I � a' t 1,y , IO 40/♦�'A® ` ��\`A� - --s '��O ,Y♦iialie•♦ e9�� �' t , 1'� ik / / a �r�al�r QatP,,_1101?-.z.'/ f!�®�, �/ �/ sr T �_i►�w i.._ i , VrelpingailisktVitty,-,,v,-,*::: : -;,. ...;:,, �'/ �'•i� i•* �d"ae .��►Y,omI �4� �`I� _`PEN444NVIi '.��AIA&No v.�����Ii.y11I''� ,lN ei�•�.0 ♦ �!�� •�♦�\�♦ ♦i �.`'oe� 4.• / � �� ����. � �.a �' 0 �`4A® — it ® lI ,i :' .ice ✓4141 04.r.47AVA �=�...'Q ‘Vel*� il• / ie? Ill i14 1�`! .I /�.� Il�''►�V �� .� ��"I •S":440 �� �� t .ate � p ' l�,� / 7424:14717144404ii, it.l rtAf��,�. 1 1V r�\r► f9��4 i�� o Cpl tr ti2A-- �� c w ♦. , sAv r Mist Ilro rt ,.,..,,,Ai1�►I1004,111.4.600* l,„„,00,,,,o�� \ �+ 01l►�� IIQI�', 240 • . 4,004.41,1,,,V1!:,•‘•1li li qr.+1\,� ��� l rgi ?.. s l�tl► 4§ •ri�r;iiwi. �' �� d 1/1►►r � /��I���ip4l�� ��I,l��Ir,�O���e��t�eh���01i \ `\i� /,�1�� 'a�o'I s�'.� ��������•""'j��'��dfa%Il1�It ,.iTA��;11'b�b�4�toi11.r;i���:�� * 1 �'.*����%'��4�,"04 , ��. >�ira j`% .givIFy�1� ;;!►,.;���Avai.4�,�.4to.;%��1•��,A,4..„ lr,,& a�,�y1�:�atr4 Ott, ,�,r� 47DI�04h.I11�lr/!4V11�a4,'r�i. ��.` - ��1���` , ��# d No t��'OtiP4O��VA, �i���.y�pc.>�dc a'¢` ��A* ,,,t ;��♦e♦,�!,t!: :144*.444��� Q��►t1•�i►�f��i►b folk* e 41,44,4•••`o.,•`•.• .01.4440,34.47:44. 2 -1,.., / - �/ iip.-M4irifilf.j/rmt.....--.' ,'L--z-a!,v-.141/41 .‘ _ - . ----oll r 210 '�'�arir ���� �i/�Oli'��!t,�,_�•..:,�: ; -:71s0 180 Azimuth from North [°]vs Centre to Centre Separation [50 usft/in] . Project: Prudhoe Bay Site: PB H Pad Well: H-19 Wellbore: H-19C Design: Plan #7 H-19C From Colour To MD 0 3000 3000 3300 From 9600'md (7") to TD Scan interal 25 ft 3300 3600 Scale 1 inch : 50ft 3600 3900 Some wells fail the major risk 3900 4300 TCRWs are in place 4300 4800 See AC summary report for detailes ____J 4800 4300 4300 6000 0 6000 7000 �_ ` ` 7000 8000 'Il`I t�t �� �� ` �:` 8000 — 9000 <L`�' � • 530 9000 10000 i — �� ,��� 10000 _ 11000 11000 12000 �D itato viiiropyro..4.**10„,,,,-- „,iiii, �� 12000 – moo -.4;---,\N"\Nor -41 .,..-4,44, ..0.4...4*-4.---iimi-4'.'"Iller`l h,_ 4117:4 ............'."\ .. A*./.0 , 4 4101Priartairillardir. ., -.... .. ., .itt kisyjk..4fg.46,....411,1.!1,44.-7j1:60,...rftk-Nefilif',.. li\ 11‘3k\1 ��:4A1" 4 300 4\\\‘',14W . - .,,c.:10 / so 1 i di __/.../ ... ... ... ... ..... _ ..... .... .... ... ... .:,. ... ., \ , , ., , , , , , ..,„;,„...,4„,,,„,,,._ / I , Xfir' ,.;41,,,iiiiii„,4� it 270 l$ /I1�6����11�I.,.aaaO.IJd� IW‘VIRIP ;1 i i i i 1 I I I i I I 1 I I I i A/ di 1 id all 141r1111114 ‘OVkvillittfirsk, -/i 41 id 1 110 ,/-,-- Vii,„•r. ,40, .1,(,'e4/V.Ea1 P4100lj1111111i11t1w014111Wmipg ►& : 1/- -I s. ►% ' d: = 240 irittilF41141,iiffig lir oie..- 41101111 -.. ,. 120 iQ027 ., '4411111111111107 � iir,irapiii,,,, 100'4 \ 1 1416W1111111 15. 210 150 --.,4‘14.atiiii _... ,-- ' 180 Azimuth from North [°]vs Centre to Centre Separation [50 usft/in] TREE= 6-3/8"GA1E-LS WELLHEAD= At EVOY SAFE.. ,40TES: WELL ANGLE>70'@ 10845' ACTUATOR= BAKER C INITIAL KB.Eli 80.3 BF.ELEV= 44.38' KOP= 3400 2112' F-5-1/2"OTIS HRQ SSSVN,ID=4562' thax Angle= 96°a 12476' '4 Datum MD= 11314' 2599' -19-5/8"t)1 COLLAR Datum 1VD= 8800'SS -.- k ST ND WI) DEV TYPE VLV LATCH PORT DA IL 13-3/8"CSG,72#,L-80,ID=12.347" H 2654' --A 5 3278 3276 8 OTIS CAW RK 0 09/09/13 4 6755 5804 51 OTIS OMT RK 0 09/09/13 Minimum ID = 2.377" @ 10312' I L 3 8612 7096 41 OTIS DMY RK 0 07/10/98 2 9971 8069 50 °TS MY RK 0 07/10/98 TOP OF 2-718" LINER - 1 10115 8159 52 OTIS -EMPTY- - 04/15/14k - ---- I I I 10194' -f5-1/2"OTIS XA SLICING SLV,ID=4.562" 5-1/2"TBG,17#,L-80 BTC-M, - 10252' . 10252' -TOP OF TIW SBR .0232 bpf,I)=4.892' - _ - 10 l 268' 9-5/8"X 7"TNV FKR,0=4.750" ' ---.* 10273' Il-7'MILLOUT ID<TENSION,ID=7 ____ ------ 10278' 1-7'X 4-1/2"X0,ID=3.958" 3-3/4"BKR DEFLOY LENT SLV,ID=3.00" I- 10308' p 10299' I-4-1/2"WFD WRP(03/04/14) TOP OF 2-7/8"LNR,ID=2.377" H 10312' I I 10314' -4-1/2-011S X NIP,ID=3.813" TOP OF BOT TEBACK SLEEVE - 10346' ---- I Ii 10353' H4-1/2"OTIS XN NIP,AILLE)TO 3.80"ID BEHIND 9-5/8"X 7"E3OT LNR HGR -I 10356' 2___„.„..„.1 10390' H 4-1/2"WLEG,ID=3_958" - 10376' -EAU TT LOGGMON-)2i /-0 CT LN R 4-1/2'1BG,12.6#,L-80 R8, -i 10390' - " .0152 bpf,0"3.95F _ 11017' -FISH-FOS THICKNESS TOOL ARMS 9-5/8'CSG,47#,L-80,0=8.681' --1 10599' i Al ..(AVVGRS 1/22/14) LNR DAMAGE OR POSSIBLE siDETRACK -1 11017 1---_____ __ - -- - PBTD OF SIDETRACK IS 11668' ( ______---' 7"WILLOW'WINDOW(14-19B) 10683'-10688' EST)MATMTOC —r--- ? -----74 ? _FH:PPS-25 MEMORY GAUGE, 7'LNR,26#,L-80,.0383 bpf,II)=6.276' --I —10680 12'L X 1.25"00(06/14/13) ,,,,,,.....,.. WHIPSTOCK w/RA TAG @ 10689' ---1 10680' III • "..t. 11650' -1 2-7/8"C8P(9/17/13) 1 '4,4r4if, /•.•.1/1...1. 12650' -FISH-CBP MILED& NI* PUSFEDBTM(8/11/141) PERFORATION SUMMARY Nip 12650'CTM -(BP(05/08/09) REF LOG:SWS MCI\L ON 07/06/98 ANGLE AT TOP PERI:91' @ 12150' Note:Refer to Roduction DB for historical perf data p, SIZE SFF INTERVAL Opri/Sqz SHOT SQZ A'- 1-11/16" 4 11908-11994 S 0708/98 07/05/11 FBTD H 12830' 1 k N 2" 6 12150-12200 C 05/09/09 1-11/16" 4 12271-12399 C 07/08/98 1-11/16' 4 12698-12810 C 07/08/98 2-7/8"LNR,6.16#,L-80 STL,.0058 bpf,ID=2.441'1--E12896' DATE REV BY- COMVENTS DATE REV BY COMMENTS PRUCHOE BAY UNIT 01/31/83 AUEI 3 INITIAL COMPLETION 01/02114 SW/JNI) SQEEZECRETETOC(11/30/13) WELL 1-3-19B 11/04/87 NiES RINO 03/10/14 STF/JM) 4-1/2"WFD WRP(03/04114) PEEWIT No:'1980940 07/08/98 CTD ABANDON (H-19A) 04/16/14 ,JNINYJMD GLV GO(04/15/14) AFI No: 50-029-20883-02 07/08/98 NORDIC CTO SIDETRACK (1419B) SEC 21,T11N,R13E,590'FNL.&1735'FEL 10/25/13 JL/PJC SET COP(9117/13) 11/08/13 DU/JAA3 1HEE Q/0(10/21/13) BP Exploration(Alaska) 1REE. 6-378'MRS = IkEVOY H-19B P R E R I G SAFETY NOTES:1NaL ANGI E>7e"48 1084 'ACTUATOR== BAKER C FETAL KB.BE 80.3 BF aEv= 44.38' KOP- 34972112 H5-1/2'01SFMSSSVN.0-4.582' 1 Max Angle. 96'012475 C 'Datum MO= 11314' Datum TVD a 880 755 ( 2599' —{9-5/8'DV COLLAR I GAS LFT MVCRB.S 13 3/8'CSG,721,L•80,D.12 347' --f 2654' STI IAD_TVO DCV TYPE_VLV LATCH PORT BATE 5 3278 3276 8 0T6 01A' RK 0 09/09113 is 19N1 TED TOC 95/8' --I 7604" r� /� 4 6755 5604 51 OTS DIV RK 0 09109113 W 60% EXCESS ..__.»....._. ♦� �, t1 4 3 8812 7096 41 OILS DIY RK 0 07/10/98 0I �1 2 9971 8069 50 OTIS DAM FE 0 07/1058 r8JT1NA1ED TOC PLUG —{ 9115' I j1!♦♦♦11♦t it♦♦♦1.., 1 10115 8159 52 OTIS DAY RIK 0 07/10/99 lo, 4.444-4441.1414, 14014 14 .4 ♦, 11 m)ar4 1019_6:i-15.1/2"OM XA SUMO SLV,1)*4 567 i 4144 •1/1 .. 11.111541•14441. 5.12'1BG,176,L-80 BTC-MI 1025' :1.1/1♦♦♦1♦♦♦♦/%♦A♦,6/ '1►1'11♦♦♦#♦i♦ , 10257 TOP OFTMISER 0232 bpi,O=4 897 41!♦4'11411.0*114 �4 1♦i 1 &,A$!&.!&4. A 10268' 9-sir x r TM/i(R,D*4.750" 1/ 4impR.4I I 10273• Hr f.9-Lour scr13131oN D.? 1 ms ,'♦1 :/ { 10278' HT X4-12"XO,D..3.958' 3.314'BKRCOLO?MINT Sly,D•3.00/' H 10309' 4 1 04 I 10299' H4-17VIFOVIRiPM3/04/14) ♦ 14 rTCPCE2-718'IN;D=2.377 10312 ••� �i 10314' --11-17OT15X NP,ID=3.613" I I10P OF BOT T®AG(SLEEVE 103441' :i i 4.010_353' H4-112-OILS XN PP,MUM 3.80'1) 9.5/8'X7"BOT LPN HOP 103541' j• 9 `: /44 10390' H4-1/71NLEG,D...3.956"I BEHIND �!' rA ( 10376' HBMOTTLOGGFCON??i??t7? ICTLNR 4-17 TBG,12.66,L-80 PEE, 10390' 11 �1 .0152bpf,0=3.966' �1 O4 11017' RSH-POS TWINES TOOL ARLES 9-51@'CSG,476,L-80,O=8.881' H 10599' (AV GR5122114) IPOSSBLE LINER DAMAGE —{ 11017'-11668' - 7'FALLOUT VWCOW/(14.1981 10683-10688' r i R z T 'N''N 9 I—FElt PPS-25 M4NvRY GAUGE I r LFR,Mt,110, 0383 bpf,D=6276'-,.-{--..1 Q�0 ►1I.. 12'L X 125'013(08/14/13) 11. V 11. ' •*��•e 11660' 2-7/8'CBP(9117113] • 1NRf BTOG(r 1 RA TAG Q 10869 10680' ,' x �►i�I// 444,4 vow 1.♦.♦.♦.♦.1.♦.!, 12660' RSH-CRP WILLED& PUSHED B1M(87111141) PERFORATION SUMARY 12660'CTM III MP(05/08/01). FIEF LOG SVAS 1C 1-014 07/06/96 ANGLE AT TOP FE 8F 91'012150 Nbie Refer to Roduction DB for historical paf data SQE ' SFF INTERVAL Ow/5oz SHOT SO2 ..... 1-11/16" 4 11908-11994 S 0708/98 07/05/11 PBTD 12630' *� 2' 6 12150-12200 C 05109109 �- 1-11/16' 4 12271-12399 C 07/08/96 1-11/16' 4 12608-12810 C 07/08/98 2-718'LNR,5188.L-80 511,.0058 bpf,0=2.44r 12896' DATE REV BY (XI ATS BALE Fitt/BY COIAINTS PR JDHOEBAY UNIT 01/31/63 INITIAL COMPLETION 01/23/14 TN RFC ISL CIA11 FISH(1122/14) WELL: H-19B 11/04/67 N1135 F8'40 01/23/14 TN PJC POSSBIE INR DAMAGE(122114) F0S,IT No 1980940 07/08/O CTD SIDETRACK(H-198) 03110/14 STFNMO 4-12'MD WlP(03104/14) AR Fb. 50-029-20883-02 10/25/13 JL/PJC SET CBP(9117/13) SEC 21,TI IN RI3E,590/Rd.&1735'FEL 11/08/13 CUU143 ARM OO(10/21/13) 01/OQ/14 SY8,1140 SOE4ZBCAETETOC(11/30/13)V J IP Exploration(Alaska! H-19C PTD Page 8 4/22/2014 TREE* 6318'CANFIS YuHLTEKO# IltEVOY H-19C PROPOSED AC1UWTOR m BAKER C PAWL KB.RE 80 3' BF REV= 44-38' KOP* 3400' I I 1 I 21$r -{X-NFPLe 1 Muc Alk .....__. 96"4 12476' OsuxoIAD= 11314' L1aWm7V0--_ 880088 j —_ L_259r I-19-508'w.00LLAR i GAS LFT MAF[fNL3 13 3�'CSC 728,L•90 ID*12.34T f-19-664' MirlI ST MD NO DEV TY FE VLV LATCH PORT GATE 4 3611 3600 OTIS OMY RK 0 0909113 9-5/0'X r LFR MA 31W 3 5941 5600 OTS MAY RK 0 07/10/96 -� 2 1953 7250 OTB MAY RK 0 0711019E 1 9405 8450 OTs DMV FE 0 07110/96 9-518"CSCa,471F.L-80.0 E 6.861' 3300 9-5A6"wwsToac 3300-3316' i1i1i 1i1i 4�i1i 4i1i�i 4.4..44.4.4.4.4.4.4.4 9380' J--f r it 4-112'TNT PKR I I boo, HX-NRPLE 1 9140" XN-NFR F �,_� ' 9/80' -rx4-1/rLIPAN)W Ir 260 L-801 NR,1 -0276' H i-- 1 4 4-112'SOLS 12.90.13a1-00,13=3.93—{ -10800' 1 I I I I I I I i I I 14-11r X 5.85'SWELL PKR I).3A56-{ 13060' I I 14.12'3LOT.1280 1-80 0.3858' –{ 13060' 1' DATE REV BY OOI.D4BNTS DATE REV BY (X)I TS -1 FROMM BAY LINT 01/31163 IMTIAL COMPLETION 0123114 TA/RIC ALL CAR/FISH(1/22/14) WELL. 14-196 11/01167 N183 i61/O 0123/14 TA/RIC POSSEILE LFR DAMAGE(1/22114) Few pe,'1960940 07106190 CT°MDETFMCK(14,191003110/14 STRIA) 4-117 INFOWi'(03+04/14) ' AR No 50-029-20883-02 10125/13- .URIC SET CBP(9/17/13) 03/19/14 WT lF1V1 TU)F1tfPSH)SIDETRACK SEC 21.T1 IN.R13E,593 at 8 1735'FH 11/08/13 0134,0 TFC 00(10121/13) 01/02/14 SVI/JM) SCIEEZECRETETOC(11/30/13) BPBiplorrfloo(Alrks) H-19C PTD Page 9 4/22/2014 yg 4 1 1 4 . - t., . H. 1 . c) 1 MIIIMMII r, ,-) C.) I I le6.• CZ1 HI 1 HI 1 - fiiik. r•-• ,.n 1111—F 775"I.737 C.) "*." :. .. r_.,\I ., ,...., . ., .. .. . . . , E. ...1.4 4 -.•• :: : * 4. : m %e —: . , )t 1 C) ,«- I ii, .....: No :. I 1 t n::, : ; : ''- '`'' • ` ,...,,,, '',)'' iff'")11 1 , I I •I , 11.10.i,,,. `II ilk' / • I',ja.:It , 2=1_ 7_74 I Tx I or I I 1 II 1 's--- 1 I I 1 1 4,-...-- Hi ! Ii ki. 4 1 21 ... ... I., , ,i iiirrr-. IR _ II ,,.• i T - - „.... i ,.. 11 .ii t A I t4 11 ao 111111.. 'P '- • / ::: 51-iti: Ull.,:'.6„... • , m km : s : , i s , - ?, • i- a• ) If't t 'kill 0 'S IIIIIIIIIII --I, 2ta -' '$1' 11'1 1:1. . ) r ti .,7"1 it-, !1:1t' ---y--,A .. , ), 1 Ie. : r— ,iir ....,4 I° F. • II 1 1 a N r .2 St t Hist . 0 I 01 01 N , . il. 1. 10 1 11, 1' t ffi ti •7 i i 1 H-19C PTD Page 10 4/22/2014 Ferguson. Victoria L (DOA) From: Gorrell,John <John.Gorrel►@bp.com> Sent: Thursday, May 01, 2014 3:03 PM To: Ferguson,Victoria L(DOA) Cc: Thompson,Jacob Subject: RE: PBU H-19C(PTD 214-055)Anti-collision Follow Up Flag: Follow up Flag Status: Flagged Victoria, I am covering H-19C for Jacob while he is out on vacation. If you will notice in the AC report, the wells H-11 and H-22A are labeled as"Pass—Minor 1/200".These wells were first classified as failing major risk. We then take steps to eliminate any HSE risk associated with colliding with these wells. In the case of H-11, it is an inoperable well that has been packed with killweight fluid and a deep set plug placed above the possible collision point. H-22A has a plug set in the production liner above the possible collision point and will be shut in at surface. Please let me know if you have any further questions, John Gorrell IPA Rotary Drilling Engineer BP Exploration Alaska, GWO Office: (907)564-5458 Mobile: (907)229-9986 john.gorrell@bp.com From: Ferguson, Victoria L(DOA) [mailto:victoria.ferguson@alaska.gov] Sent:Tuesday, April 29, 2014 10:54 AM To: Thompson, Jacob Subject: PBU H-19C(PTD 214-055)Anti-collision Jacob, H-11 and H22A are identified as fail major risk. However, in the Anti-collision report(compass 5000 output) neither well is identified as fail major risk. Is this the relevant anti-collision report?A TCR is also mentioned as being"in place". Please provide the TCR and the mitigation measures for anti-collision. Thanx, Victoria Victoria Ferguson Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W 7th Ave,Ste 100 Anchorage,AK 99501 Work. (907)793-1247 victoria.ferqusonaalaska qov 1 Ferguson, Victoria L (DOA) From: Gorrell,John <John.Gorrell@bp.com> Sent: Thursday, May 01, 2014 3:03 PM To: Ferguson,Victoria L(DOA) Cc: Thompson,Jacob Subject: RE: PBU H-19C(PTD 214-055)Anti-collision Follow Up Flag: Follow up Flag Status: Flagged Victoria, I am covering H-19C for Jacob while he is out on vacation. If you will notice in the AC report, the wells H-11 and H-22A are labeled as "Pass—Minor 1/200". These wells were first classified as failing major risk. We then take steps to eliminate any HSE risk associated with colliding with these wells. In the case of H-11, it is an inoperable well that has been packed with killweight fluid and a deep set plug placed above the possible collision point. H-22A has a plug set in the production liner above the possible collision point and will be shut in at surface. Please let me know if you have any further questions, John Gorrell IPA Rotary Drilling Engineer BP Exploration Alaska, GWO Office. (907)564-5458 Mobile: (907)229-9986 john.gorrell@bp.com From: Ferguson,Victoria L(DOA) [mailto:victoria.ferguson@alaska.gov] Sent: Tuesday, April 29, 2014 10:54 AM To:Thompson, Jacob Subject: PBU H-19C(PTD 214-055)Anti-collision Jacob, H-11 and H22A are identified as fail major risk. However, in the Anti-collision report(compass 5000 output) neither well is identified as fail major risk. Is this the relevant anti-collision report?A TCR is also mentioned as being"in place". Please provide the TCR and the mitigation measures for anti-collision. Thanx, Victoria Victoria Ferguson Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W 7th Ave,Ste 100 Anchorage,AK 99501 Work (907)793-1247 victoria ferquson analaska qov 1 OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME: 79e_ PTD: Z/ ( Development _Service Exploratory Stratigraphic Test _Non-Conventional FIELD: �jilz l�[C POOL: ✓ Lc �.�C,,:e r Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI LATERAL The permit is for a new wellbore segment of existing well Permit (If last two digits No. , API No. 50- - - - . in API number are Production should continue to be reported as a function of the original between 60-69) API number stated above. In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name Pilot Hole ( PH) and API number (50- - - - ) from records, data and logs acquired for well(name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce / inject is contingent upon issuance of a Spacing Exception conservation order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10'sample intervals through target zones. Please note the following special condition of this permit: Production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 MC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application,the following well logs are Well Logging also required for this well: Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 MC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 4/2014 ❑❑ T co 8) o co co co T a• m _o 3 (n co )) C V). W c C 7 2 0 Y. y. • L , C w Cl)N, , O T N, a co a) O = W > E > L 0 co 0) Y, a a ▪ O a w. E co- 0 ai E a) N, a4) 6 _ cE0 O v x m Y, a) O `p a) -o •c• co 'O U, fd 0-; O r, a 3 8. 3'c �n V "o m -o > o m COaa a CO a) 0 �-p' 0 co N T.)- -C -o Y 3 N, 0 "0 cc C C' N p 3 o m 3 3, e' a 0 o ° a) 3 a w y q - 0) Ln COc 0 O, _ CO -0 c a y, m, c Lf) 0 0 .) Oci) n f0 te+, >.. n WO co '` a) Nf) a F J 3 p> 0 a� a O2y v do O H M O dc yOD n w o a o COE J a) N, 4) N- co N, iG a), Q 0 a 00 a) Ti. p. .@ w, a, _cr o co w To Lp c >, p. �' N, Q' 0. m c. 'O V W O. U) CO m O N' �, N t0: O, Cl) O W i � �-. w, 3, N, N. Qy I N Cl), N N .0 _ _ 0 O N 0 _c N O c c o L'" .O' y, N . N' a N d O OJ a N O = 4) G) CO6.. y, C O3, N .3;CA _; 0ITS LD 0 > — c Ln, N, z. C ; y a , N a), c ai 0 c m CK m N 'Si 'S,, E, o, o, M; �, N �, a — W N N a) a) O 'R a N a — a) E c. 0 o 3 V, > y 4 €, N o, E y z 3 2 -p U a). a) .(>1 O, 0), . a)' 3 -0 'U m 3 U, U, 3 @, U O a, E' -0 C E 01 c co a 0 Ce z0 '0' moc O a o = o2) , a • Lu w a 0 o U (n u) a i a Q 2 2 I = d a w 0 Q 2 2 'N) 222N22N NNQQ o N 8; N; N; QNN; N0N; N) Q o 8', QQ Q a z >- >- >- >- >- r >- >- >- >- >- >- z z z z z z z z z >. z } >- z zr z zz, T o 0 cn N LL a a 01 c U o c To a) 7T-) 3 — E a) o U , `co5 O C O p O .N _T 3 E , o O O. O M , U C C' j O 5. o, m 3 o `m _c o �, E, co o O W N N V) N Q• N a). O. O CA X O > C O N N U a (0 u '� U LL N X 2 j O > LL c .o 3 0 (A co cr C, a 7 Q O a0 a) a a. N. O Q N cam.) i0 N. 'O O W, CD w N a) Q CC w N a _ U °� V) f0 N CO C' CL c o m N - t c E, a w a c a) E o. 3 3 w c > 'm mc o M u) $ N' o a`i c c u) 3 3 > a) N, Q U • a) C cv •f0 CO >" 4 O 0 'C O, o E a'O), 'co 4 °' M, •€ O _ 3, cn co ._ .0 O) E Z' N CO. 3 3 a) �. (n C CO .0 C co 3 3 O Lp, 3 < 3 tl), p CU — -a O C -O O Cl) c -O N N `p. D' O C, 0 m, O' O co a, L c C tq C' O Q E E -oo c; c E L, m o o r) c c '0, , c 2 - �S c, cc' c p L_ ( Na N' C a o 00 m o o c a 0 m d in o o' Q o' api' co' Si U 'S a U o, p a �, 3 0 � �, cp Y •y O C C. p c, N., c0 N Q N 0 'O O 0) O a) a) w Q a p a) a) >, o > > 42 v m m o Y m ° o o o f i