Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
214-059
• • 213 3 Vg WELL LOG TRANSMITTAL#904039211 To: Alaska Oil and Gas Conservation Comm. July 10, 2017 Attn.: Makana Bender RECEIVED �C�"E 333 West 7th Avenue, Suite 100 G G H Anchorage, Alaska 99501 DATA LOGGED g JUL 19 2017 M.K.BENDER 0 E .K. R RE: Coil Flag Log: E-36B Run Date:5/17/2017 AO G C C The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari,Halliburton Wireline &Perforating, 6900 Arctic Blvd.,Anchorage,AK 99518 E-36B Digital Data(LAS), Digital Log file (Field Data) 1 CD Rom 50-029-22583-02 Coil Flag Log(Field Print) 1 Color Log 50-029-22583-02 SCANNED AUG 1 0 201? PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline &Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-275-2605 Fax: 907-273-3535 FRS_ANC@halliburton.com Date: Signed: vai242.4zei STATE OF ALASKA I ALASKA OIL AND GAS CONSERVATION COMMIS* REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate m Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 214-059 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-22563-02-00 7. Property Designation(Lease Number): ADL 0028304 8. Well Name and Number: PBU E-36B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 11808 feet Plugs measured 11500 feet R' true vertical 9145 feet Junk measured feet JUIV 2017 Effective Depth: measured 11500 feet Packer measured 8916 feet AOGCC vertical 9094 feet Packer true vertical 8537.24 feet A OGCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 78 20"91.5#H-40 36-114 36-114 1490 470 Surface 3614 10-3/4"45.5#NT-8 36-3649 36-3640 4560 1730 Intermediate Production 9195 7-5/8"29.7#L-80 34-9229 34-8785 6890 4790 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 11090-11115 feet 11115-11140 feet 11166-11230 feet 11625-11700 feet True vertical depth: 9066-9067 feet feet 9067-9067 feet 9068-9069 feet 9111-9121 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 32-8963 32-8578 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): SCANNED JUL 2 4 201? Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 349 15568 57 550 812 Subsequent to operation: 324 15077 45 300 741 14.Attachments:(required per 20 AAC 25.070.25.071,8 25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory 0 Development Q Service ❑ Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG ❑ GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Derrick,Laurie R Contact Name: Derrick,Laurie R Authorized Title: Petroleum7trEngineer 1 Contact Email: Laurie.Derrick@bp.com Authorized Signature: 'I�A w . . . OAAAjtDate: 6//G�/u/I� Contact Phone: +1 907 564 5952 Form 10-404 Revised 04/2017 V� 111—/ /q— i 7--Aor 7/ R D D MS ` .J J U N 2 0 2017 Submit Original Only .. • • RECEIVED JUN 2 0 2017 AOGCC Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary June 19, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Adding of Perforations for Well E-36B, PTD # 214-059. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage,AK 99519-6612 r• • • — r O — U a a rnmcm M co00 " o co co •- c) co O co co N O CO - CO 1- ,— Lo O CC) C- r) 00 CA 00 03 CO M CO N CO CO � CO 0 C MMM CO CO C N co M N CO CO N O In CA - M O CO O) CO V CI iW < CO e- M M M CO CO c' C CO M N _ M M M CO CO 0') M W ELCO 0 0 0 0 - Q H 00 00 00 09 �) z J J J J J N colt 1--4* 04t N N •Ci) • r cri N r O - - C) - -60 Q. p N ch N M c O � M ; _ r+ O)00 r- O N- O O M o co CA N in co • z O O V N V zoOwwwm O ncezzzp 0cna _1JJt— . • • Packers and SSV's Attachment PBU E-36B SW Name Type MD ND Depscription E-36B PACKER 8831 8462.68 3-1/2" Baker 45 KB Packer E-36B TBG PACKER 8916.16 8537.24 4-1/2" Baker SABL-3 Packer o. 0 • A 0Zip R 7 � L = x % a) CD _/ $ / '% -CT) c C — - � -C I• / RE EI0- ci eL o $k c - ® ~ - CO 9-/ / t % 41 a41 Go _ �� N- E! » 0 >- o —1 g 2 / co E 4-6 / jca k / / >, O / _ a- .— v � / / CO To - CD - 6 k + /\ 3 @ O O I [ f \ o E EC >. W U \ ; % Lo % f f & f ° a 0 \ / � �\ -06 ° % / C k 'a ta. -1LD < £ < Q 2 c « / ok oKk § k3 ko CL ƒ \ ƒ a^ƒ -_c =a_ 2 � < — L m « Q O . o Q » mom Z CO•CO0 Z � / k / � E\ k : 2 / D o / 3 / : =A : al � . co' ' _ 0 5 L £ = . 2 ' @ t \ x ¥ Q 9 o .. ' b & Qo § U >$ o $ b k t ƒ \ ¢ -1 2 t 2 $ C L , a \ y = \ Q o E E e » Q E f w w ,s0 2@ 2 ) a i » o I w ¥ _1 2 0 2 2 0.« m@ .c & : E I � = 2g D20 /t < t / m2 / k $ 2 I E | U k & U \ 2 _1 12 o_ / Oka | E S & < ¥ N- N- ¥ 0 d (N \ \ CO # \ .4- , » ¥ CO � � o � \ \ / < TREE= .. 4-1/16"CNV • VI,EU_FEAD= FMC E-36B SAFETY NOTES: WELL ANGLE>70°@ 9450'*** ACTUATOR= CAMERON SH MAX DOGLEG =36.9°@ 9740' OKB.B_EV= 64.1' I I 34.4' I I 2197' 1-[4-1/2"OTIS HXO SSSVN,D=3.813" 1 KOP= 1050' J Max Angle= 96"@ 10163' DatumMD= 9343' GAS LIFT MANDRELS DatumTVD= 8800'SS ST MD TVD DEV TYPE VLV LATCH PORT DATE I 10-3/4"CSG,45.5#,NT-80,D=9.953" - U 2 4830 4812 12 CA DOME BK 16 09/29/16{ 3648' 1 6265 6175 23 CA DOME BK 16 09/29/16 * 8831' -{45 KB LW,ID=2.36"(07/23/14) Minimum ID = 1,78�� a@ 8849 ALUMINUM BUSHING IN DEPLOY SLV 8838' - (CLO ED07CMD 2DS4) D=2.313" (CLOSED 07/23/14) 8844' H3.70"BKR DEPLOY SLV,D=3.00" 8850' H 3-1/2"X 2.891"XO,D=2.70" TOP OF 2-3/8"LNR 8861' 1_ 8851' -{3.27"BKR DEPLOY SLv,2 , 0.701 =1.78" TOP OF 3-1/2"X 3-3/16"X 2-7/8"LNR -{ 8883' ( r 8883' H 3.70"BKR DEPLOY SLV,D=3.00" 8892' BTT AL PROFILE MPLED TO 2.780'(05/07/13) I t_- 8902' -14-1/2"HES X MP,D=3.813" S� 8914' -j 7-5/8"x 4-1/2"BKR S3 PKR,0=3.875" 3-1/7 LNR,9.2#,L-80 SRL, - 8933' 1-- .0087 bpf,ID=2.992" ' 8933' H3-1/2"x 3-3116"x0,D=2.786" BEHIND ' 8937' H4-1/2"HES x NP,D=3.813" CT LNR 4-1/2"TBG, 12.6#,L-80 NSCT, H 8960' 8 8� H4-112"HES XN tom,MLLED TO 3.80"(12/19/08) .0152 bpf,D=3.958" \ —f 8960' –41/7 WLEG,D=3.958" BEHIND TOP OF CEMENT g.._�r_... CT LNR �- 180' 1 8955' ELME TT LOGGED 10!04195 IaA ►11 7-5/W'WHPSTOCK w/RA TAG @ 9234" --I 9224' 'bit/I` 7-5/8"CSG,29.7#,L-80 NSCC, H -9224 1 i� MLLOIJT WINDOW(E-36A) 9229'-9238' .0459 bpf, D=6.875" %• ►jO 1�5G 7 ! 3-3/16"PKR WHPSTOCK'(06/27/14) 9522' w/RA TAG @ 9527" • 3-3/16"LNR,6.2#,L-80 TCI, 9522' MLLOUT WINDOW(E-36B) 9522'-9527' .0076 bpf,0=2.80" ESTMATED TOC(07/10/14) -J 10200' N PERFORATION SUMMARY 1 EF RLOG:GR/CCL./RPM ON 07/11/14 1 ANGLE AT TOP PERF:90"@11090' 10702' H2-3/8"RA PUP JOINT,D=1.995" Nate.Refer to Production DB for historical perf data ' SIZE SPF INTERVAL Opn/Sqc SHOT SOZ 1.56" 6 11090-11115 0 08/31/141 1.56" 6 11115-11140 0 08/30/14 1 1.56" 6 11166-11230 0 05/17/17 11301' -2-3/8"RA PUP JOINT,ID=1.995" 1.56" 6 11625-11700 C 07/11/14 = 1 1 ' 11500'CTM H2-3/8"WED CBP(08/30/14) F13TD --I 11769') y . I t 2-3/8"LNR,4.7#,L-80 TH511,.0039 bpf,D=1.995" -I 11808' DATE REV BY COMMENTS DATE REV BY COMENTS PRUDHOE BAY MIR 07/05/95 N28E ORIGINAL COMPLETION 10/03/16 JR/JMD PULLED PX PLUG<TP(09/29/16) YUELL: E 36B 01/17/09 NORDIC 1CTD SIDETRACK(E-36A) 10/03/16 MGS/JMD GLV C/O(09/29/16) PERMT No:'2140590 07/12/14 NORDIC i CTD SIDETRACK(E-36B) 05/23/17 CF/JMD AOFERFS(05/17/17) AR Na: 50-029-22563-02 08/05/14 JW PJC FINAL ODE APPROVAL SEC 6,T11N,R14E,1706'FNL&882'Fa 09/28/16 CJN/JMD GLV C/O(09/26/16) 10/03/16 KPIJMD TREE C/O(09/27/16) BP Exploration(Alaska) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspectionioof the file. 1 - 0 5_q Well History File Identifier Organizing(done) ❑ Two-sided ❑ Rescan Needed RESCAN: OVERSIZED: NOTES: tpivof r Items: ❑ Maps: rayscale Items: ogs: ❑ Poor Quality Originals: ❑ Other: ❑ Other: (/Yj0BY: Maria Date: 1 Project Proofing BY: Date:J g ' J /s/ ire e Scanning Preparation a x 30 = 0 + = TOTAL PAGES gf 7 (Count does not include cover sheet) BY: Date: S /'s /s/ Production Scanning Stage 1 Page Count from Scanned File: (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: YES NO BY: _. Date: 5-/q I is /s/ l Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Stage 2 Additional Well Reports: YES NO TOTAL PAGES: Digital version appended by: Meredith Michal Date: /s/ Final Page Count: Stage I + Stage 2: TOTAL PAGES: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: /s/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc O o o O , Nm J I W M9 ml ml ml ml -) a LL co m o v v v v 0 rn w N Z c o 0 0 0 W LL O OI LL Q a N 6 -1 -I _I CNI a> p J W I Z a) 0 ai 0 0 0 D E a m H Q u > c 5 }I co o_ _o o_ 0 2 2 m 0 Z u) T w ZI Wal ZI al v1 a1 H W p1 0 F a� a)0 hi 0 0 Z aiO g > N N0 Z z cIn co c0 Q co In N N U mUI VI �I co co Q a3 Cl)t Q �Q Q Q O O m w N N C COit wa a a w- J J g 2 I I I �I �I w wl J C') C/) wQ wQ LJQ LI 02 ri cnQ m wo wo E Z 0 • m▪ al mCO il �WI mal ��I -6(Xi to-- a- a� to a) co C.) 0 0 o2 a2 w � w2 0 IU LI- rn WAY c.)EL ga c.)EL 0a 0a ga a-(1),„ 00 1 0 10 0 11 ES a co E 'cw 'ca 'ca 'cw 'cce •ca can- •c�= •c �Y Ec01 U) m o, o 2 22 22 22 22 22 a>o 2Jm 20F oO- N J U J U 1l1l 1 1 W colI 75 CO a)a) NmNmNomyomN0 .7Nco. Na) IN l co IL a p W Mm- WMm- WMA Wc � WoW M N2 WMO wM2 WMo 0 U C •p '•)- a) -4- .- V v v v to CL Y 0 0 0 0 0 0 0 W co O N N N N N N N N —I d N 0 0 N 0 N N 0 CO N CO N N IX J • a) a) OD 00 00 CO V V V a. W W C.) 2 2 m , V ZLco co < lb'` a (D 0 o N o r- r` o eo y R N J a -a CL c 21 = r o 0 C p co y 0 0 N G O y b) ao O rn N E a> a0 E a U o JV. co , o Q m CGz c M CD ct C 2 to v a c ami z E) J 2 • (NI J a) MQ W m 0J N O w ct co I m O 0 co a a �_ Q iri a of ce o Z E z C7 0 0 a 0 o 0 co E J m co -a0 Z (/) co co co co co co a� as co co w m co m m m m -o m m m C E p 0 0 0 0 0 co 0 0 0 v m rn Z m m m m m To I o m m rn rn .rn rn 2 orn m rn rn rn O p z C ` 0 0 0 0 0 0 J 0 0 0 c > 0 « 0 ja v v v a c v v o 0 0 Tt Q Z t c 0 io E v v v v v v a co � U) N 2 0 O w w a z N N N N N N N N N N 0• H ,_ co a o o E M E °O o° 0 co Z O c °_)'0 0•, W U. d 0 0 2 0 0 0 0 0 0 0 0 0 0 v Q' Z W J m 0 W Q o. d O.° Q 0 0 0 0 0 0 o o o 0 OQ d CC 0 I- 3 J (3H W w w w W w J w W W o w, CV W 00 0CV 1 LLI I a an ZLL Q Q } } Z '-a. N I Za > w Z I Y I Z Q CA _U Q L.T. lY as oo X m 2 b_ J LL a) T 9 D Z coI T T T •ca cl mI VI Z UI L T 4) a) _ co a CO o o LI o 01 > > > Z Z aa' co I 01 0 o) Q Fa- o > V) fn N n 7I H p_ O Z' Z vl v1 0 0 c c �I 'aI vl o1 •U d m et 'I W W LLL LLL y y N N NI �I OI N N (0 J J CO CO CO CO CO CO CO J= J 0 O O 03 —) —) E 0 0(r) co co co CO M CO ai —) J ill 92 woo w w w w w w w wo awo E 0 Oai N1 ui UIa ai hi hi hi hi hi hi hi col ai y1 cg) ii ct p ii c Y •ii LL •ii ii ii ii ii 'u. Et rn ii Y 0 0 ILL 0 1ce V o 0 0 0 0 0 10 0 IU a) g 7 ECL c� 1 c c c c c c c EEYY cC I E u) w° IoOI- „E(.9.,-_ 0 0 0 0 0 0 0 o(F o02 E >- e >- i aa,0�1 UI a0i 1001 a0) a0) a0) aa)) aa)) aa)) a0) a0)oo UI N�1 co o @ • W M S W M D W LU W W W W LU W M S W M O CO N 0 • LL ZO = u� (n (n (n (n (n (n (0 p « a :° 0 CL - V o 0 0 0 0 0 0 0 0 0 o Ey E p W N N N N N N N N N N N 10 7 0 M M M M M M M M CO CO CO V) Z y Ce O N N N N N N N N N N N N J co a) V 'Cr 'Cr V V V 7 V I.L W Vd J a7• O a I Z m O E J 0 c.) w :: 0 Q «O, O 0 N CD _ a co y J a J °• co c Eo 0CLc 2 0 0 d C cn o V) C• N Z. V N U CJ E., o —I O N Q co ma. M ° OD (6 a r ZZ 7 o. O E _ co O 5 = 0 = „(6 — G N CON Q N a) 0 iii a) E CO m 0 I— E W >. 0 CO O a) r iii c rn co CO x 0 V) CI)• N c c c o Q re o o CD N r a to = •c a Q 0 a 0 2 O Z Eo > 0 5 0 0— 2 0 0 Z m Co co Co as co Co Co Co co Co vv a) co Co Co Co Co co Co co co co Co 3 0 0 0 0 0 0 0 0 0 0 0 E Z N N m Co.. Co Co Co Co Co Co Co Co Co Co 0 ��----�� r o 0 0 0 0 0 0 0 0 0 0 0 0 E p �`�"`JJJJI lFc�� 0) > 1 0 0 0 0 0 0 0 0 0 0 0 1 o LLI S } N 1— 10 0 0 0 0 0 0 0 0 0 0 C W co p Q o (o co Co co co Co co Co Co co co L U) � � � � 0 In In U) N N N N N N N N N N N N I d w 0 O N 0. y W 0 C y = ai n 0 OO a) (0 O LL' a) ,- 0 0 N Z o 0 E Q o g , z o Co U �•, — U 0 0 0 0 0 0 0 0 0 0 C 2 _N .0 O� J N a) C-7 E 0 O a -o o a a0i O m 0 0 0 0 0 0 0 0 0 0 0 0 a) LL o 2 a0) 0 o m a M w w w w w LU LU W LU w w 3 ? 0 a 0 0 0 Ce C vi 0 0 N N o 06 M N W N Z Q N N oh _ N In_ H O z a J 0O z - 1 7 d w co H co ° IX a OA Z 1.� O U IX ° J a W W U m o Z o Q m o0. NI a �, p O to o0 E y M Vv d o J E M mE Q ��? 0 ODa r U W z 0 C N 1111 CNI m m CI co asQ a ° m Q C n z E Q U m z m a El o a) > m o ~ 'o a) N m N '5 a) E co a' 0 O u W y wO. Cto G E of E a 0 m E E a a M° ci 0 211-i-059 yr Zs&OLD PRINT DISTRIBUTION LIST BAKER HUGHES Please sign and return one copy of this transmittal form to: COMPANY BP Exploration Alaska Inc BP Exploration (Alaska) Inc. (mandatory) Petrotechnical Data Center, LR2-1 WELL NAME E-36B 900 E. Benson Blvd. (mandatory) Anchorage,Alaska 99508 FIELD Prudhoe Bay to acknowledge receipt of this data. (mandatory) COUNTY North Slope Borough LOG TYPE LWD-Coil (mandatory) (mandatory) STATE Alaska BH DISTRICT Alaska (mandatory) (mandatory) LOG DATE: July 07,2014 TODAYS DATE: 22-Apr-15 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: Paula Lacey EMAIL: paula.lacey@bakerhughes.com (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? No COMPANY FIELD FINAL CD Final CD ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) LOGS LOGS (digital/image) Surveys (Final Surveys) PERSON ATTENTION #OF PRINTS #OF PPKIN I #OF COPIES #OF COPIES#OF COPIES 1 BP North Slope EOA,PBOC,PRB-20(Office 109) Attn:D&C Wells Project Aids Agatha Rutka&Barbara Glassmaker C " E D 900 East Benson Boulevard Anchorage,AK,99519 APR 2 J 2015 2 ConocoPhillips Alaska Inc. Attn:Ricky Elgaricio AOGr ATO 3-344 v�v 700 G Street Anchorage,AK 99510 3 ExxonMobil,Alaska I I I I Attn:Lynda M.Yaskell and/or Leonardo Elias 3201 C Street,Suite 505 Anchorage,AK 99503 4'State of Alaska -AOGCC I 2 I 1 I 2 1 Attn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 5',DNR-Division of Oil&Gas *** I I iAttn:Sean Clifton 550 West 7th Avenue,Suite 802 Anchorage,Alaska 99501 ***Stamp"confidential"on all material deliver to DNR 6 BP Exploration(Alaska)Inc. Petrotechnical Data Center,LR2-1 900 E.Benson Blvd. Anchorage,Alaska 99508 Attn: Janette Englapd TOTALS FOR THIS PAGE: 2 1 2 1 0 TOTALS FOR ALL PAGES: 0 2 1 2 1 0 2( 4 - 059 25(00o Øbp RECEIVED , APR 23 2015 AOGCC North America - ALASKA - BP 9 Prudhoe Bay PB E Pad E-36 500292256300 r4: v E-36B 1 Design: E-36B � Y Survey Report - Geographic 15 July, 2014 BAKER HUGHES 0440 IN"- b�� Survey Report-Geographic BAKER -0,04 HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 64.10usft(NORDIC 1) Site: PB E Pad MD Reference: ORIG KELLY BUSHING @ 64.10usft(NORDIC 1) Well: E-36 North Reference: True Wellbore: E-36B Survey Calculation Method: Minimum Curvature Design: E-36B Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB E Pad,TR-11-14 Site Position: Northing: 5,973,160.88 usft Latitude: 70°19'59.134 N From: Map Easting: 662,538.97 usft Longitude: 148°40'53.05 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.24 ° Well E-36 API No. 500292256300 Well Position +N/-S 0.00 usft Northing: 5,975,350.05 usft Latitude: 70°20'20.326 N +E/-W 0.00 usft Easting: 664,102.28 usft Longitude: 148°40'6.01 W I Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 28.90 usft Wellbore E-36B API no. 500292256302 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°l (0) (nT) BGGM2013 7/8/2014 19.73 81.03 57,631 Design E-36B Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,506 00 Vertical Section: Depth From(TVD) +N/-S +EI-W Direction (usft) (usft) (usft) (°) 34.10 0.00 0.00 170.00 Survey Program Date: 7/15/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 151.60 9,223.90 1 :MWD-Standard(E-36) MWD MWD-Standard 9,223.90 9,506.00 MWD(E-36A) MWD MWD-Standard 9,522.00 9,558.64 INC+TREND(E-36B) INC+TREND Inclinometer+known azi trend 9,589.61 11,771.00 MWD(E-36B) MWD MWD-Standard 7/15/2014 2:22:54PM Page 2 COMPASS 5000.1 Build 61 Ira- _ 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36 Project: Prudhoe Bay ND Reference: ORIG KELLY BUSHING @ 64.10usft(NORDIC 1) Site: PB E Pad MD Reference: ORIG KELLY BUSHING @ 64.10usft(NORDIC 1) Well: E-36 North Reference: True Wellbore: E-36B Survey Calculation Method: Minimum Curvature Design: E-36B Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (^) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,506.00 71.69 282.67 8,935.36 1,700.40 -1,322.29 5,977,020.99 662,743.19 70°20'37.048 N 148°40'44.64 W TIP 9,522.00 71.96 279.12 8,940.36 1,703.27 -1,337.21 5,977,023.53 662,728.21 70°20'37.076 N 148°40'45.08 W KOP 9,558.64 66.45 270.69 8,953.38 1,706.25 -1,371.28 5,977,025.76 662,694.08 70°20'37.105 N 148°40'46.08 W Interpolated Azimuth 9,589.61 65.41 263.30 8,966.02 1,704.77 -1,399.49 5,977,023.67 662,665.91 70°20'37.091 N 148°40'46.90 W First Clean Survey 9,621.62 63.58 254.02 8,979.83 1,699.12 -1,427.78 5,977,017.40 662,637.76 70°20'37.035 N 148°40'47.73 W 9,649.39 63.92 243.69 8,992.14 1,690.15 -1,450.97 5,977,007.92 662,614.77 70°20'36.947 N 148°40'48.40 W 9,679.44 63.58 234.24 9,005.46 1,676.28 -1,474.02 5,976,993.55 662,592.03 70°20'36.810 N 148°40'49.08 W 9,709.44 64.39 226.75 9,018.63 1,659.14 -1,494.80 5,976,975.96 662,571.63 70°20'36.642 N 148°40'49.68 W 9,739.60 64.33 214.41 9,031.72 1,638.54 -1,512.44 5,976,954.99 662,554.45 70°20'36.439 N 148°40'50.20 W 9,770.72 66.64 203.45 9,044.67 1,613.80 -1,526.09 5,976,929.96 662,541.35 70°20'36.196 N 148°40'50.60 W 9,799.50 69.29 194.94 9,055.48 1,588.63 -1,534.83 5,976,904.60 662,533.16 70°20'35.948 N 148°40'50.85 W 9,830.37 76.46 186.50 9,064.58 1,559.69 -1,540.27 5,976,875.55 662,528.36 70°20'35.664 N 148°40'51.01 W 9,860.20 78.72 180.85 9,070.99 1,530.63 -1,542.13 5,976,846.46 662,527.13 70°20'35.378 N 148°40'51.07 W 9,891.38 79.03 180.04 9,077.01 1,500.04 -1,542.37 5,976,815.87 662,527.56 70°20'35.077 N 148°40'51.07 W 9,920.41 81.29 175.66 9,081.97 1,471.46 -1,541.29 5,976,787.33 662,529.27 70°20'34.796 N 148°40'51.04 W 9,950.29 84.99 174.05 9,085.54 1,441.92 -1,538.63 5,976,757.86 662,532.57 70°20'34.505 N 148°40'50.96 W 9,980.28 88.01 172.36 9,087.37 1,412.20 -1,535.09 5,976,728.22 662,536.76 70°20'34.213 N 148°40'50.86 W 10,010.28 90.61 170.35 9,087.73 1,382.55 -1,530.58 5,976,698.68 662,541.92 70°20'33.921 N 148°40'50.73 W 10,040.33 94.12 170.04 9,086.49 1,352.97 -1,525.46 5,976,669.22 662,547.68 70°20'33.631 N 148°40'50.58 W 10,070.38 95.44 169.71 9,083.99 1,323.49 -1,520.20 5,976,639.86 662,553.58 70°20'33.341 N 148°40'50.42 W 10,100.30 94.85 165.65 9,081.31 1,294.38 -1,513.84 5,976,610.90 662,560.58 70°20'33.054 N 148°40'50.24 W 10,130.24 95.07 161.54 9,078.72 1,265.78 -1,505.42 5,976,582.49 662,569.62 70°20'32.773 N 148°40'49.99 W 10,163.04 95.65 158.63 9,075.65 1,235.08 -1,494.30 5,976,552.04 662,581.41 70°20'32.471 N 148°40'49.67 W 10,191.14 94.76 154.25 9,073.10 1,209.43 -1,483.12 5,976,526.65 662,593.15 70°20'32.219 N 148°40'49.34 W 10,220.12 96.00 151.03 9,070.38 1,183.81 -1,469.86 5,976,501.33 662,606.97 70°20'31.967 N 148°40'48.95 W 10,250.00 94.05 149.50 9,067.77 1,157.97 -1,455.10 5,976,475.82 662,622.29 70°20'31.713 N 148°40'48.52 W 10,280.17 92.76 147.72 9,065.97 1,132.26 -1,439.41 5,976,450.46 662,638.54 70°20'31.460 N 148°40'48.06 W 10,310.54 90.58 146.39 9,065.09 1,106.79 -1,422.90 5,976,425.36 662,655.60 70°20'31.210 N 148°40'47.58 W 10,340.12 88.10 143.33 9,065.43 1,082.60 -1,405.88 5,976,401.55 662,673.14 70°20'30.972 N 148°40'47.08 W 10,370.12 89.02 140.61 9,066.18 1,058.98 -1,387.41 5,976,378.34 662,692.13 70°20'30.739 N 148°40'46.54 W 10,400.15 89.48 138.19 9,066.58 1,036.19 -1,367.87 5,976,355.98 662,712.16 70°20'30.515 N 148°40'45.97 W 10,430.14 88.99 143.27 9,066.98 1,012.98 -1,348.89 5,976,333.20 662,731.64 70°20'30.287 N 148°40'45.42 W 10,460.28 89.60 147.62 9,067.35 988.16 -1,331.80 5,976,308.76 662,749.26 70°20'30.043 N 148°40'44.92 W 10,490.15 90.98 149.54 9,067.20 962.68 -1,316.23 5,976,283.62 662,765.39 70°20'29.792 N 148°40'44.46 W 10,520.15 91.72 154.52 9,066.49 936.20 -1,302.17 5,976,257.46 662,780.02 70°20'29.532 N 148°40'44.05 W 10,550.43 90.28 158.13 9,065.96 908.47 -1,290.02 5,976,230.01 662,792.78 70°20'29.259 N 148°40'43.70 W 10,580.45 90.74 160.10 9,065.69 880.43 -1,279.31 5,976,202.21 662,804.09 70°20'28.984 N 148°40'43.39 W 10,610.52 89.91 163.92 9,065.52 851.83 -1,270.03 5,976,173.83 662,814.00 70°20'28.702 N 148°40'43.11 W 10,640.48 89.91 166.96 9,065.57 822.84 -1,262.50 5,976,145.01 662,822.16 70°20'28.417 N 148°40'42.89 W 10,671.62 90.21 170.89 9,065.54 792.29 -1,256.52 5,976,114.59 662,828.81 70°20'28.117 N 148°40'42.72 W 10,700.52 89.69 174.42 9,065.56 763.63 -1,252.82 5,976,086.03 662,833.13 70°20'27.835 N 148°40'42.61 W 10,730.55 89.88 177.93 9,065.68 733.67 -1,250.82 5,976,056.12 662,835.79 70°20'27.540 N 148°40'42.55 W 10,760.46 91.48 181.79 9,065.32 703.77 -1,250.75 5,976,026.23 662,836.52 70°20'27.246 N 148°40'42.55 W 10,790.44 92.64 184.34 9,064.24 673.85 -1,252.35 5,975,996.29 662,835.57 70°20'26.952 N 148°40'42.60 W 10,820.35 89.42 182.93 9,063.71 644.01 -1,254.24 5,975,966.42 662,834.33 70°20'26.658 N 148°40'42.65 W 10,850.11 91.23 178.13 9,063.54 614.27 -1,254.52 5,975,936.67 662,834.70 70°20'26.366 N 148°40'42.66 W 10,880.18 88.49 174.66 9,063.61 584.26 -1,252.63 5,975,906.72 662,837.25 70°20'26.071 N 148°40'42.60 W 10,910.38 89.66 173.08 9,064.10 554.24 -1,249.41 5,975,876.78 662,841.13 70°20'25.776 N 148°40'42.51 W 10,940.24 89.66 171.90 9,064.27 524.64 -1,245.50 5,975,847.27 662,845.68 70°20'25.484 N 148°40'42.40 W 10,970.32 89.82 170.82 9,064.41 494.90 -1,240.98 5,975,817.64 662,850.85 70°20'25.192 N 148°40'42.26 W 11,000.35 89.36 169.16 9,064.63 465.33 -1,235.76 5,975,788.19 662,856.71 70°20'24.901 N 148°40'42.11 W 7/15/2014 2:22:54PM Page 3 COMPASS 5000.1 Build 61 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 64.10usft(NORDIC 1) Site: PB E Pad MD Reference: ORIG KELLY BUSHING @ 64.10usft(NORDIC 1) Well: E-36 North Reference: True Wellbore: E-36B Survey Calculation Method: Minimum Curvature Design: E-36B Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +El-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 11,030.37 89.02 167.40 9,065.05 435.94 -1,229.67 5,975,758.94 662,863.45 70°20'24.612 N 148°40'41.93 W 11,060.28 88.56 164.86 9,065.68 406.91 -1,222.50 5,975,730.08 662,871.25 70°20'24.327 N 148°40'41.72 W 11,090.51 89.63 163.59 9,066.16 377.82 -1,214.28 5,975,701.18 662,880.10 70°20'24.041 N 148°40'41.48 W 11,130.73 87.97 161.24 9,067.00 339.49 -1,202.14 5,975,663.13 662,893.09 70°20'23.664 N 148°40'41.13 W 11,161.61 89.14 160.00 9,067.78 310.38 -1,191.89 5,975,634.25 662,903.96 70°20'23.377 N 148°40'40.83 W 11,190.29 89.20 157.92 9,068.20 283.61 -1,181.60 5,975,607.72 662,914.84 70°20'23.114 N 148°40'40.53 W 11,228.33 87.54 157.85 9,069.28 248.39 -1,167.28 5,975,572.81 662,929.92 70°20'22.768 N 148°40'40.11 W 11,258.35 85.55 156.06 9,071.09 220.81 -1,155.55 5,975,545.51 662,942.25 70°20'22.497 N 148°40'39.77 W 11,289.87 84.41 153.89 9,073.85 192.36 -1,142.27 5,975,517.36 662,956.15 70°20'22.217 N 148°40'39.38 W 11,321.01 85.85 151.55 9,076.49 164.79 -1,128.05 5,975,490.10 662,970.97 70°20'21.946 N 148°40'38.96 W 11,353.76 84.90 149.06 9,079.13 136.44 -1,111.88 5,975,462.11 662,987.75 70°20'21.667 N 148°40'38.49 W 11,380.28 84.46 146.81 9,081.59 114.06 -1,097.87 5,975,440.05 663,002.26 70°20'21.447 N 148°40'38.08 W 11,410.28 84.41 143.95 9,084.50 89.49 -1,080.91 5,975,415.86 663,019.75 70°20'21.205 N 148°40'37.59 W 11,440.45 84.25 140.70 9,087.48 65.73 -1,062.56 5,975,392.51 663,038.61 70°20'20.971 N 148°40'37.05 W 11,470.46 83.80 138.17 9,090.61 43.06 -1,043.15 5,975,370.27 663,058.51 70°20'20.748 N 148°40'36.48 W 11,502.15 82.96 136.24 9,094.26 19.96 -1,021.77 5,975,347.65 663,080.39 70°20'20.521 N 148°40'35.86 W 11,530.27 81.81 132.34 9,097.99 0.50 -1,001.82 5,975,328.63 663,100.76 70°20'20.330 N 148°40'35.28 W 11,560.38 81.53 129.54 9,102.35 -19.02 -979.32 5,975,309.61 663,123.68 70°20'20.138 N 148°40'34.62 W 11,590.19 82.28 126.52 9,106.55 -37.20 -956.07 5,975,291.94 663,147.32 70°20'19.959 N 148°40'33.94 W 11,620.18 82.09 123.96 9,110.63 -54.34 -931.81 5,975,275.34 663,171.95 70°20'19.791 N 148°40'33.23 W 11,650.12 84.99 121.96 9,114.00 -70.52 -906.85 5,975,259.71 663,197.25 70°20'19.632 N 148°40'32.50 W 11,680.40 80.26 117.66 9,117.88 -85.45 -880.81 5,975,245.35 663,223.61 70°20'19.485 N 148°40'31.74 W 11,710.24 78.61 112.04 9,123.36 -97.77 -854.21 5,975,233.61 663,250.48 70°20'19.364 N 148°40'30.96 W 11,740.24 77.39 108.73 9,129.60 -107.99 -826.71 5,975,224.00 663,278.19 70°20'19.263 N 148°40'30.16 W 11,771.00 77.16 107.86 9,136.37 -117.41 -798.22 5,975,215.21 663,306.88 70°20'19.171 N 148°40'29.33 W 11,808.00 77.16 107.86 9,144.60 -128.48 -763.88 5,975,204.90 663,341.45 70°20'19.062 N 148°40'28.33 W Projected To TD-Projection to TD 7/15/2014 2:22:54PM Page 4 COMPASS 5000.1 Build 61 rgr 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 64.10usft(NORDIC 1) Site: PB E Pad MD Reference: ORIG KELLY BUSHING @ 64.10usft(NORDIC 1) Well: E-36 North Reference: True Wellbore; E-36B Survey Calculation Method: Minimum Curvature Design: E-36B Database: EDM R5K-Alaska PROD-ANCP1 Targets Target Name -hit/miss target Dip Angle Dip Dir. TVD +NI-S +El-W Northing Easting -Shape (°) (0) (usft) (usft) (usft) (usft) (usft) Latitude Longitude E-36B Target 1 0.00 0.00 9,074.10 1,503.92 -1,576.85 5,976,819.00 662,493.00 70°20'35.115 N 148°40'52.08 W -actual wellpath misses target center by 34.56usft at 9887.27usft MD(9076.23 TVD,1504.07 N,-1542.36 E) -Point E-36B Target 4.1 0.00 0.00 9,069.10 295.15 -1,147.18 5,975,620.00 662,949.00 70°20'23.228 N 148°40'39.52 W -actual wellpath misses target center by 36.24usft at 11192.59usft MD(9068.23 TVD,281.48 N,-1180.73 E) -Point E-36B Polygon 0.00 0.00 64.10 1,430.06 -1,812.54 5,976,740.00 662,259.00 70°20'34.388 N 148°40'58.97 W -actual wellpath misses target center by 8888.91 usft at 9506.00usft MD(8935.36 TVD,1700.40 N,-1322.29 E) -Polygon Point 1 64.10 -48.84 -8.07 5,976,691.00 662,252.00 Point 2 64.10 -36.50 479.35 5,976,714.00 662,739.00 Point 3 64.10 -1,926.64 1,601.33 5,974,849.00 663,902.00 Point4 64.10 -2,160.92 1,291.11 5,974,608.00 663,597.00 Point 5 64.10 -1,346.69 560.70 5,975,406.00 662,849.00 E-36B Fault 2 0.00 0.00 64.10 777.07 -1,913.87 5,976,085.00 662,172.00 70°20'27.966 N 148°41'1.92 W -actual wellpath misses target center by 8938.78usft at 9506.0ousft MD(8935.36 TVD,1700.40 N,-1322.29 E) -Polygon Point 1 64.10 0.00 0.00 5,976,085.00 662,172.00 Point 2 64.10 182.19 725.21 5,976,283.00 662,893.00 E-36B Target 2 0.00 0.00 9,064.10 1,272.55 -1,608.93 5,976,587.00 662,466.00 70°20'32.839 N 148°40'53.02 W -actual wellpath misses target center by 99.06usft at 10100.30usft MD(9081.31 TVD,1294.38 N,-1513.84 E) -Point E-36B Target 3 0.00 0.00 9,069.10 590.29 -1,286.76 5,975,912.00 662,803.00 70°20'26.130 N 148°40'43.60 W -actual wellpath misses target center by 33.98usft at 10872.03usft MD(9063.45 TVD,592.38 N,-1253.32 E) -Point E-36B Fault 5 0.00 0.00 64.10 -447.97 -969.38 5,974,881.00 663,143.00 70°20'15.919 N 148°40'34.33 W -actual wellpath misses target center by 9033.70usft at 11258.35usft MD(9071.09 TVD,220.81 N,-1155.55 E) -Polygon Point 1 64.10 0.00 0.00 5,974,881.00 663,143.00 Point 2 64.10 262.41 167.79 5,975,147.00 663,305.00 E-36B Target 4 0.00 0.00 9,069.10 295.15 -1,147.18 5,975,620.00 662,949.00 70°20'23.228 N 148°40'39.52 W -actual wellpath misses target center by 36.24usft at 11192.59usft MD(9068.23 TVD,281.48 N,-1180.73 E) -Point E-36B Fault 4 0.00 0.00 64.10 159.96 -912.06 5,975,490.00 663,187.00 70°20'21.898 N 148°40'32.65 W -actual wellpath misses target center by 9008.98usft at 11190.29usft MD(9068.20 TVD,283.61 N,-1181.60 E) -Polygon Point 1 64.10 0.00 0.00 5,975,490.00 663,187.00 Point 2 64.10 171.00 504.90 5,975,672.00 663,688.00 E-36B Target 2.1 0.00 0.00 9,064.10 1,272.55 -1,608.93 5,976,587.00 662,466.00 70°20'32.839 N 148°40'53.02 W -actual wellpath misses target center by 99.06usft at 10100.30usft MD(9081.31 TVD,1294.38 N,-1513.84 E) -Point E-36B Fault 3 0.00 0.00 64.10 130.20 -1,471.89 5,975,448.00 662,628.00 70°20'21.605 N 148°40'49.01 W -actual wellpath misses target center by 9009.15usft at 11090.51 usft MD(9066.16 TVD,377.82 N,-1214.28 E) -Polygon Point 1 64.10 0.00 0.00 5,975,448.00 662,628.00 Point 2 64.10 89.72 197.02 5,975,542.00 662,823.00 E-36B Target 5 0.00 0.00 9,214.10 -298.82 -700.04 5,975,036.00 663,409.00 70°20'17.386 N 148°40'26.46 W -actual wellpath misses target center by 194.74usft at 11808.00usft MD(9144.60 TVD,-128.48 N,-763.88 E) -Point E-36B Target 1.1 0.00 0.00 9,074.10 1,503.92 -1,576.85 5,976,819.00 662,493.00 70°20'35.115 N 148°40'52.08 W -actual wellpath misses target center by 34.56usft at 9887.27usft MD(9076.23 TVD,1504.07 N,-1542.36 E) -Point E-36B Fault 6 0.00 0.00 64.10 -140.38 -489.50 5,975,199.00 663,616.00 70°20'18.945 N 148°40'20.31 W 7/15/2014 2:22:54PM Page 5 COMPASS 50001 Build 61 • bp Survey Report-Geographic BAKER .w.' HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 64.10usft(NORDIC 1) Site: PB E Pad MD Reference: ORIG KELLY BUSHING©64.10usft(NORDIC 1) Well: E-36 North Reference: True Wellbore: E-368 Survey Calculation Method: Minimum Curvature Design: E-36B Database: EDM R5K-Alaska PROD-ANCP1 -actual wellpath misses target center by 9038.80usft at 11258.35usft MD(9071.09 TVD,220.81 N,-1155.55 E) -Polygon Point 1 64.10 0.00 0.00 5,975,199.00 663,616.00 Point 2 64.10 68.85 327.61 5,975,275.00 663,942.00 E-36B Target 3.1 0.00 0.00 9,069.10 590.29 -1,286.76 5,975,912.00 662,803.00 70°20'26.130 N 148°40'43.60 W -actual wellpath misses target center by 33.98usft at 10872.03usft MD(9063.45 TVD,592.38 N,-1253.32 E) -Point E-36B Target 6.1 0.00 0.00 9,149.10 -56.71 -838.78 5,975,275.00 663,265.00 70°20'19.767 N 148°40'30.51 W -actual wellpath misses target center by 50.69usft at 11715.75usft MD(9124.46 TVD,-99.77 N,-849.19 E) -Point E-36B Fault 1 0.00 0.00 64.10 834.23 -2,011.64 5,976,140.00 662,073.00 70°20'28.528 N 148°41'4.78 W -actual wellpath misses target center by 8940.07usft at 9506.00usft MD(8935.36 TVD,1700.40 N,-1322.29 E) -Polygon Point 1 64.10 0.00 0.00 5,976,140.00 662,073.00 Point 2 64.10 216.86 832.00 5,976,375.00 662,900.00 E-36B Target 7.1 0.00 0.00 9,214.10 -256.49 -623.09 5,975,080.00 663,485.00 70°20'17.803 N 148°40'24.21 W -actual wellpath misses target center by 202.59usft at 11808.00usft MD(9144.60 TVD,-128.48 N,-763.88 E) -Point E-36B Target 5.1 0.00 0.00 9,087.51 102.48 -1,014.95 5,975,430.28 663,085.40 70°20'21.333 N 148°40'35.66 W -actual wellpath misses target center by 60.12usft at 11443.48usft MD(9087.79 TVD,63.40 N,-1060.64 E) -Point Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 11.808.00 9,144.60 PRODUCTION LINER 1 2.375 3 250 Design Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (usft) (usft) (usft) (usft) Comment 9,506.00 8,935.36 1,700.40 -1,322.29 TIP 9,522.00 8,940.36 1,703.27 -1,337.21 KOP 9,558.64 8,953.38 1,706.25 -1,371.28 Interpolated Azimuth 9,589.61 8,966.02 1,704.77 -1,399.49 First Clean Survey 11,808.00 9,144.60 -128.48 -763.88 Projected To TD 11,808.00 9,144.60 -128.48 -763.88 Projection to TD Checked By: Approved By: Date: 7/15/2014 2:22:54PM Page 6 COMPASS 5000.1 Build 61 Guhl, Meredith D (DOA) From: Guhl, Meredith D (DOA) Sent: Tuesday, April 21, 2015 10:39 AM To: 'Lastufka, Joseph N' Cc: Davies, Stephen F (DOA) Subject: PBU E-36B, PTD 214-059, GR/RES data and Directional Survey required Hello Joe, In pulling the report to run final compliance on the well PBU E-36B, PTD 214-059, I noted that though MWD/GR/RES is noted as a log completed,at this time we have only received the Reservoir Performance Monitor. Also, no digital directional survey data has been received. Please supply the digital and paper data for the MWD/GR/RES logs and the digital directional survey data by May 4, 2015. Please send it to my attention. If you have any questions, please contact me. Thank you, Meredith Meredith Guhl Petroleum Geology Assistant Alaska Oil and Gas Conservation Commission 333 W. 7th Ave,Suite 100,Anchorage,AK 99501 meredith.guhl@alaska.gov Direct: (907) 793-1235 CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information. The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Meredith Guhl at 907-793-1235 or meredith.guhl@alaska.gov. 1 STATE OF ALASKA AL A OIL AND GAS CONSERVATION COMM Al REPORT OF SUNDRY WELL OPERATIONS I V`7 1.Operations Abandon L] Repair Well LJ Plug Perforations Perforate U Other U Set Plifd C/3 P Performed. Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extension❑ 0---- Change VChange Approved Program ❑ Operat Shutdown❑ Stimulate-Other ❑ Re-enter Suspended WeII❑ 2 Operator 4.Well Class Before Work. 5.Permit to Dnll Number Name BP Exploration(Alaska),Inc Development Exploratory ❑ 214-059-0 3.Address. P O Box 196612 Stratigraphiclj Service ❑ 6.API Number: Anchorage,AK 99519-6612 50-029-22563-02-00 7.Property Designation(Lease Number) 8.Well Name and Number ADL0028304 PBU E-36B 9 Logs(List logs and submit electronic and pnnted data per 20AAC25 071) 10 Field/Pool(s). PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary Total Depth measured 11808 feet Plugs measured 11500 feet RECEIVED true vertical 9144 6 feet Junk measured None feet SEP 2 2 2014 Effective Depth measured 11500 feet Packer measured See Attachment feet true vertical 9094 feet true vertical See Attachment feet AOGCC Casing Length Size MD ND Burst Collapse Structural None None None None None None Conductor 75 20"91 5#H-40 35-110 35-110 1490 470 Surface 3613 10-3/4"45.5#NT-80 35-3648 35-3638.45 4560 1730 Intermediate None None None None None None Production 9194 7-5/8"29.7#L-80 35-9229 35-8785 07 6890 4790 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 11090-11115 feet 11115-11140 feet 11625-11700 feet True Vertical depth 9066.16-9066 54 feet 9066 54-9067 31 feet 9111.28-9121.39 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 35-8960 35-8575 23 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12 Stimulation or cement squeeze summary Intervals treated(measured). Treatment descriptions including volumes used and final pressure: 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Pnor to well operation: 22 2160 1 0 159 Subsequent to operation: 1113 5885 128 0 178 14 Attachments. 15.Well Class after work Copies of Logs and Surveys Run Exploratory❑ Development Q Service❑ Stratigraphic D Daily Report of Well Operations X 16.Well Status after work Oil Q Gas ❑ WDSPL❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP 0 SPLUC] 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C O Exempt: N/A Contact Nita Summerhays Email Nita.Summerhays(U�bp.com Pnnted Name Nita Summerhays Title Petrotechnical Data Engineer //17 / / ,;,-'"''.r eearii�:,..--" ,.._: Phone 564-4035 Date 9/22/2014 v` 1/LF RBCMS SEP 2 4 2 Form 10-404 Revised 10/2012 Submit Onginal Only Daily Report of Well Operations ADL0028304 ACTIVITYDATE SUMMARY T/I/0 = 180/1540/0. Temp = 70°. WHPs (eval high IAP). Hardline rigged up to IA from TBG on well 29. IA FL @ 6255' (sta# 1 S/O). 8/23/2014 SV= C. WV, SSV, MV= O. IA, OA= OTG. CTU#8 1.5"coil CV=23.9 bbl Objective: Drift, GR/CCL, Set CIBP,Add perf MIRU. MU CTC (1.5"), X-over(1.75"), DHCV(1.75"), Stinger(1.75"), Stinger (1.75"), JSN (1.75") OAL=10.167'. RIH w/Drift. 8/29/2014 ***Job continued on WSR 08/30/2014*** CTU#8 1.5"coil CV=23.9 bbl Objective: Drift, GR/CCL, Set CIBP,Add pert MU CTC (1.5"), X-over(1.75"), DHCV(1.75"), Stinger(1.75"), Stinger(1.75"), JSN (1.75") OAL=10.167'. RIH w/Drift. Tag TD at 11765' CTM. POOH. MU RIH w/WFD Dimple CTC (1.69"), MHA(1.69"), X-over(1.69"), SLB GR/CCL(1.75") OAL=21.27'. Tag above flag at 11689'. Log tie-in from 11689'to 11000'. Painted white flag @ 11450.0' (unc EOP= 11428.69'). POOH. LD logs (6.5' correction, corr EOP = 11435.19'). MU BHA w/WFD 2-3/8" CIBP. Loaded tbg down backside w/ 178 bbls of 1% KCL+ 10 bbl 50/50 McOH. RIH w/WFD 2- 3/8" CIBP. Corr depth at flag = 11,445.9'. Dropped 0.5" ball, circed w/KCL. Set CIBP at 11,500.2' CTM. POOH. PT CIBP to 2500 psi lost 12 psi in 20 min. MU WFD Dimple CTC, MHA 9/16"disco ,SLB PJ guns(OAL=33.30' ,MOD 1.69") . Perform WELL CONTROL DRILL; Large Flange leak with lead operator running the CTU. Pump ball to seat w/50/50 Meoh PERFORATED 11115'- 11140'w/1.56" SLB PJ1606 at 6 SPF and 60 deg Phz. POOH. 8/30/2014 ***Job continued on WSR 08-31-2014*** CTU#8 1.5" coil CV=23.9 bbl Objective: Drift, GR/CCL, Set CIBP,Add perf POOH. SLB Peri guns (1.56"), Bottom nose (1.56") OAL=33.30'. LD spent guns. RIH with SLB PJ guns(OAL=33.30' ,MOD 1.69") Tag CIBP 11505' Elec 11485' Mech, correct depth to 11498.94' Bottom shot. Pump ball to seat w/ 50/50 Meoh PERFORATED 11090'-11115'w/1.56" SLB PJ1606 at 6 SPF and 60 deg Phz. POOH. Freeze protect tubing w/35 bbls of 50/50 Meoh. 8/31/2014 ***Job Complete*** FLUIDS PUMPED BBLS 201 50/50 METH 203 1% KCL 404 TOTAL m U) o0 000 2 2 O O r r v U yO Q co O O O O O (D vie <NI CO Lo m , O� CO co I- In co (ammo -4- p N Ln o M .4- coLd d7 LO CA 1- (O LC) co co co co co0 H co r y- (O N CO. Ncd (f) Lo In co (O p Lo co co co .4- In LC) co co p C CO M N O CO O co CO N N O IC) N CO O • .0 CO (A O co co ▪ O 2 Q M co co • CO in co co co to Ln �n CO CO CO CA CO CO CO CoN CO CO CO C O _a▪ J Q o p OD aoo op CCDFL O O O CO CO = J J J J Z d r— N N •� N �() CO U O b co N w N M r!.. 4 L r Gln r d7 C N. O LX) M '- O O a) N OMcO -J z O 0 CD 1- w ca0IYCCa0 � Z 0 z w w w 0 CC m O z_ z_ _z o D D O J J J (21- U) F- Packers and SSV's Attachment ADL0028304 SW Name Type MD TVD Depscription E-36B PACKER 8831 8462.68 3-1/2" Baker 45 KB Packer E-36B PACKER 8914 8535.35 4-1/2" Baker S-3 Perm Packer Its= 4-1/16"CM/ ACTUATOR= BAKERC -36B MAX DOGLEG=36.9!@ 9740'E>70° 9450'••' OKB.ELEV= 641' I I BF.ELEV= 34.4' KOP= 1050' — 2197' H4-1/2"OTIS F{XO SSSVN,D=3.813" Mtax Angle= 96°t 10163' Datum ND= 9343' GAS LIFT MANDRELS Datum TV D= 8800'SS LST MD TVD DEV TYPE VLV LATCH FORT DATE 2 4830'4812 12 CA DOME BK 16 07/23/14 10-3/4'CSG,45.5#,NT-80,D=9.953" -I 3648' L- 1 I 1 6265 6175 23 CA SO BK 20 07/23/14 �L, 8831' ---I45 KB LW,D=2.36"(07/23/14) Minimum ID = 1.78" @ 8849' ALUMINUM BUSHING IN DEPLOY SLV 8838' 12-7/8"CMD SLD SLV,D=2.313• � (GLOB®07/23114) 8844• -{3.70"BKR DEPLOY SLV,D=3.00" —� 8850' -13-1/2"X 2.891"XO,ID=2.70" TOP OF 2-3/8"LNR -I 8861' I— ---- 8851' --13.27"BKR DEPLOY SLV,D=1.78" TOP OF 3-1/2"X 3-3/16'X 2-7/8"LNR -1_ 8883' 8883' H3.70"BKR DEROY SLV,D=3.00" 8892' --{BTT AL PROFLE MLLED TO 2.780"(05/07113) i 8902' H 4-1/2"HES X NP,D=3.813" S\ 8914' H7-5/8"x 4-1/2'BKR S3 PKR,D=3.875" 3-1/2"LNR 9.2#,L-80 STL, H 8933' I-- .0087 bpf,ID=2.992" I 8933' -13-112"X 3-3/16"XO,D=2.786" BEHIND 8937' H4-1/2"i IM NP,D=3.813" CT LNR ' 8948' H4-112"HES XN NP,MLLED TO 3.80"(12/19/08) 4-1/2"TBG, 12.6#,L-80 NSCT, H 8960' .0152 bpf,D=3.958" / \— 8960' '-14-1/2"WLEG,D=3.958" BEHIND TOP OF CEMENT -I 9180' I , 8955' -I EL MD TT LOGGED 10/04/95 CT LNR r 7-5/8'WHPSTOCK w/RA TAG a 9234" -I 9224' 4\ 1-4 �� 7-5/8"CSG,29 7#,L-80 NSCC, H -9224 ` � 0.%-• MLWINDOWLOUT WINDOW(E-36A) 9229'-9238' .0459 bpf, D=6.875" • i,�+►4! 3-3/16"PKR WHPSTOCK'(06/27/14) 9522' w/RA TAG @ 9527" 3-3/16"LNR 6.2#,L-80 TCR -1-81-2-F-1--------‹ 1 MLLOUT WINDOW(E-368) 9522'-9527' I .0076 bpf,D=2.80" ESTIMATED TOC(07/10/14) 10200' --\ PERFORATION SUMMARY ! REF LOG:GR/CCL/RPM ON 07/11/14 11 ANGLE AT TOP PERF:90°X11090' 10702' H2-3/8"RA PUP JOINT,ID=1.995" r II Note:Refer to Roduction DB for historical perf data ' SCE SFF INTERVAL Opn/Sqz SHOT SQZ 1.56" 6 11090-11115 0 08/31/14 I 1.56" 6 11115- 11140 0 08/30/14 1.56' 6 11625-11700 C 07/11/14 4i i 11301' H2-3/8"RA RJP JONT,D=1.995" 1 Ii 11500'CTM H2-3/8"WFD CEP(08/30/14) FBTD -I 11769' I1,, 0 2-318'LNR,4.7#,L-80 TH511,.0039 bpf,D=1.995' -I 11808' I '� 4 DATE REV BY COMMENTS DATE REV BY COMM NTS FRUDHOE BAY UNIT 07/05/95 N28E ORIGINAL COMPLETION 08/07/14 TBD/PJC SET LTF9 CLOSE SLD SLV(7/23/14) WELL: E 36B 01/17/09 NORDIC 1 CTD SIDETRACK(E-36A) 08/11/14' PJC FBTD CORRGCT1ON PEWIT No: 2140590 07/12/14 NORDIC 2 CID SIDETRACK(E-368) 09/04/14 CTM'JMD SET CIBRADPE2FS(08/30-31/14) AR No: 50-029-22563-02 07/13/14 PJC DRLG HO CORC1IONS SEC 6,T11N,R14E,1706'FN-&882'FEL 07/23/14 DLWPJC GLV C/O 08/05/14 JW PJC FINAL ODE AIIROVAL BP Exploration(Alaska) RECEIVIE "4-1 rA BAKER PRINT DISTRIBUTION LIST 2 0 2014 HUGHES AOGCC COMPANY BP Exploration Alaska,Inc. INTERMEDIATE No FINAL Yes (mandatory) DATA LOGGED WELL NAME E-36B RUN NUMBER 1 b/2.t/2O1'l M.K.BENDER (mandatory) FIELD Prudhoe Bay Unit BH SALESMAN Henry Giordanelli (mandatory) (mandatory) COUNTY North Slope BH DISTRICT Prudhoe Bay,AK (mandatory) (mandatory) STATE Alaska PAGE 1 OF 1 (mandatory) LOG DATE: July 10,2014 TODAYS DATE: 8/19/2014 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: Henry Giordanelli (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANY A B C D ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) L.I.S. FILM PERSON ATTENTION #OF PRINTS #OF 1-'KIN I S#OF COPIES#OF COPIES#OF COPIES#OF COPIES 1 ConocoPhillips Alaska Inc. 0 0 0 1 Attn:Ricky Elgaricio A= E-36B_MRPM_RAW 10JUL2014 BHI.meta ATO3-344 B= *(Folder 1 on cd/dvd) E-36B_MRPM RAW 10JUL2014 B 700 G Street C= **(Folder 2 on cd/dvd) E-36B MRPM RAW_10JUL2014 B Anchorage,AK 99510 D= ***(Folder 3 on cd/dvd) E-36B_MRPM_RAW_PASSO1 DN_1 E-36B MRPM RAW PASSO2UP 11 2 ExxonMobil,Alaska 1 1 1 1 Attn:Lynda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr.Suite 600 Anchorage,AK 99503 3 I State of Alaska-AOGCC 1 1 1 I 1 Attn:Makana Bender 1333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 4 DNR-Division of Oil&Gas 0 I 0 1 1 I Attn:Sean Clifton 550 West 7th Avenue,Suite 802 Anchorage,Alaska 99501 5 TOTALS FOR THIS PAGE: 2 2 3 4 0 0 TOTALS FOR ALL PAGES: 2 2 3 4 0 0 RECEIVED ' STATE OF ALASKA AUG 1 1 2014 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG1!3CC la. Well Status: • ®Oil ❑Gas ❑SPLUG El Other 0 Abandoned 0 Suspended 1 b. Well Class 20AAC 25.105 20AAC 25.110 El Exploratory ❑ Stratigraphic ❑GINJ El WINJ El WAG El WDSPL 0 Other No. of Completions One . IF] Development 0 Service 2. Operator Name: 5. D�Comp,,'Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 7/12/2014 214-059 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage,Alaska 99519-6612 6/30/2014 50-029-22563-02-00 • 4a. Location of Well(Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 7/8/2014 PBU E-36B ' 1706' FNL, 882' FEL, Sec. 06, T11N, R14E, UM- Top of Productive Horizon: 8. KB(ft above MSL): 64.1' • 15. Field/Pool(s) 977' FSL, 2130' FEL, Sec. 06, T11N, R14E, UM • GL(ft above MSL): 28.9' • Prudhoe Bay/Prudhoe Bay. Total Depth: 9. Plug Back Depth(MD+TVD) 1834' FNL, 1646' FEL, Sec. 06, T11N, R14E, UM • 11769' • 9136' • 4b. Location of Well(State Base Plane Coordinates, NAD: 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 664102• y- 5975350 • Zone- ASP4 • 11808' • 9145' • ADL 028304 ` TPI: x- 662836 y- 5976052 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 663342 . y- 5975205 • Zone- ASP4 • None 18. Directional Surve Y: ®Yes ❑ No 19.Water depth, if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD/GR/RES, GR/CCL/RPM 9522' . 8940' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 Surface 110' Surface, 110' 30" 260 sx Arctic Set(Approx.) 10-3/4" 45.5# NT-80 35' • 3648' 35' 3638' 13-1/2" 1140 sx CS III, 375 Class'G', 140 sx CS II 7-5/8" 29.7# L-80 35' 9229' 35' 8785' 9-7/8" 490 sx Class'G' 3-1/2"x 3-3/16" 9.2#/6.2# L-80 8883' 9522' 8508' 8940' 4-1/8" 119 sx Class'G' 2-3/8" 4.7# L-80 8831' 11808' 8463' 9145' 3-1/4" 55 sx Class'G' 24. Open to production or injection? ®Yes El No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ (MD+TVD of Top&Bottom; Perforation Size and Number): TVD) 1.56"Gun Diameter,6 spf 4-1/2", 12.6#, L-80 8960' 8914'/8535' 26. ACID,FRACTURE,CEMENT SQUEEZE, ETC. COMPLETION 11625'- 11700' 9111'-9121' WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑ Yes ® No �'f DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED }If.-- 2500' Freeze Protect w/40 Bbls Dead Crude 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc July 26, 2014 Flowing Date of Test Hours Tested Production For OIL-BBL GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: 8/2/2014 4 Test Period 4 44 1145 18 67 25907 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 150 1480 24-Hour Rate •♦ 265 - 6867 ' 73 N/A 28. CORE DATA Conventional Core(s)Acquired? El Yes ® No Sidewall Core(s)Acquired? ❑Yes ® No • If Yes to either question, list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions,core chips, photographs and laboratory analytical results per 20 AAC 250.071. None F1BCMS AUG 12 2111& Form 10-407 Revised 10/2012 CON INUED ON REVERSE Submit Original Only 1,f7-I, 3/11 /1 0 3/� 3 ,, 4,(7 i 4::-- 6.. 29. GEOLOGIC MARKERS(List all formations and ers encounter 30. FORMATION TESTS NAME ND Well Tested? ."es 0 No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test results Attach separate sheets to this form,if needed,and submit Permafrost Base detailed test information per 20 AAC 25 071 23SB-Zone 2B 9548' 8949' None 22TS 9685' 9008' 21TS-Zone 2A 9831' 9065' 23 SB-Zone 2B(Fault) 10735' 9066' Formation at Total Depth: Zone 2B 10735' 9066' 31.List of Attachment Summary of Daily Drilling Reports, Summary of Post-Rig Work,Well Schematic Diagram, Surveys, Cement 32 I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: James Niedermeyer,564-5302 Email James.Niedermeyer@bp.com Printed Name: Joe Lastufka Title: Drilling Technologist Signature: Phone 564-4091 Date S/H/i 4' INSTRUCTIONS General. This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1a. Classification of Service Wells. Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval) Item 8. The Kelly Bushing and Ground Level elevation in feet above mean sea level Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13. The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00) Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23. Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation Flowing,Gas Lift,Rod Pump, Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box Submit detailed description and analytical laboratory information required by 20 AAC 25 071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box Submit detailed test and analytical laboratory information required by 20 AAC 25.071 Form 10-407 Revised 10/2012 Submit Original Only TRS'- ` 4-1/16"CIW ACTUATOR= BAKER C E 3 6 B )TES: MAX DOGLEG 36.9°° ANGLE 70° 9450'G 97 o "' OKB.ELEV= 64 1' I I BF.ELEV= 34.4' KOP= 1050' I irff 2197' --j4-1/2"OTIS HXO SSSVN,D=3.813" Max Angie= 96`@ 10163' Datum M)=-. 9343' GAS LIFT MANDRELS Datum 1VD= 8800'SS ST MD TVD DEV TYPE VLV LATCH PORT LATE 2 4830 4812 12 CA DOME BK 16 07/23/14 10-3/4'CSG,45.5#,NT-80,D=9.953' -1 3648' 1 6265 6175 23 CA SO BK 20 07/23/14 8831' H45 KB LTP,13=2.36"(07/23/14) Minimum ID = 1.78" @ 8849' 8838' -2-7/8"CMD SLD SLV,D=2.313" ALUMINUM BUSHING IN DEPLOY SLV (CLOSED 07/23/14) LM 8844' -1 3.70"BKR DEROY SLV,D=3.00" 8850' --{3-112'X 2.891"X0,13=2.70" TOP OF 2-3/8'LNR --I 8861' l 8851' -13.27"BKR DEPLOY SLV,D=1.78" TOP OF 3-1/2'X 3-3/16'X 2-7/8'LNR -{ 8883' I 8883' -13.70"BKR DEPLOY SLV,D=3.00" 8892' -{BTT AL PROFLE MILL®TO 2.780'(05/07/13) I_---"- 8902' -14-1/2"I IM X NP,D=3.813" $ 8914' _H7-5/8"x 4-1/2'BKR S3 PKR,13=3.875' 3-1/2"LW,9.2#,L-80 STL, 8933' �_ .0087 bpf,ID=2.992" ' 8933' H3-1/2"X 3-3/16"XO,13=2.786" BEHIND l 8937' -14-1/2"HES X NP,D=3.813" CT LNR 4-1/2"TBG, 12.6#,L-80 NSCT, -I 8960' ' 8948 _-j 4-1/2"HES XN NP,MLLEDTO 3.80"(12/19/08) .0152 bpf,ID=3.958" / "�-{ 8960' -I4-1/2"WLEG,D=3.958" BEHIND ITOP OF CEMENT I--{ 9180' ) * 8955' H ELMD TT LOGGED 10/04/95 CT LNR 7-5/8'WHIPSTOCK wl RA TAG @ 9234" -{ 9224' 4.4! 7-5/8"CSG,29 7#,L-80 NSCC, -� -9224 * .� ►*~ ~.� �.�! MLLOUT WINDOW(E-36A) 9229'-9238' • +.►.r .0459 bpf, D=6.875" ►,+,4 • 3-3/16"PKR WHPSTOCK'(06/27/14) 9522' w IRA TAG @ 9527" 3-3/16"LNR,6.2#,L-80 TCI, 9522' MLLOUT WINDOW(E-36B) 9522'-9527' .0076 bpf,D=2.80' I ESTIMATED TOC(07/10/14) H 10200' I\ PERFORATION SUMMARY REF LOG:GR/OCIJF2PM ON 07/11/14 • L 10702' H2-3/8"RA PUP JOINT,D=1.995" ANGLE AT TOP PERF.83'@11625' Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz SHOT SOZ 1.56" 6 11625-11700 0 07/11/14 , 11301' -12-3/8"RA PUP JOINT,D=1.995" FBTD 11769' 2-3/8"LNR 4 7#,L-80 TH511,.0039 bpf,ID=1.995" -I 11808' ;;;"*7,* DATE REV BY COMMENTS DATE REV BY COMvENTS PRIJDHOE BAY MIT 07/05/95 N28E ORIGINAL COMPLETION 108/07/14 TBIY PJC SET LTR'CLOSE SLD SLV(7/23/14) WELL E-36B 01/17109 NORDIC 1 CTD SIDETRACK(E-36A) 08/11/14 PJC PBTD CORRECTION PERNIT Nu. 1140590 07/12/14 NORDIC 2CID SIDETRACK(E-36B) ARNP- 50-029-22563-02 07/13/14 PJC DRLG HO CORRECTIONS SEC 6,T11 N,R14E, 1706'FNL 8 882'FEL 07/23/14 DLI-VPJC GLV C/O 08/05/14 JN'PJC FINAL ODE AFT-ROVAL BP Exploration(Alaska) North America-ALASKA-BP Page 1 of 11 Operation Summary Report Common Well Name:E-36 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:6/27/2014 End Date:7/9/2014 X3-015DD-C:(3,025,583.00) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.:NORDIC 2 Spud Date/Time:6/12/1995 12:00:00AM Rig Release:7/12/2014 Rig Contractor:NORDIC CALISTA UWI:500292256300 Active datum:ORIG KELLY BUSHING @64.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 6/27/2014 00:00 - 05:30 5.50 MOB P PRE WAIT ON RIG MATS PJSM,MOVE OFF OF WELL,CLEAN AROUND WELL LOAD RIG MATS 05:30 - 06:30 1.00 MOB i P i PRE .PJSM,MOVE RIG TO END OF PAD 06:30 - 19:00 12.50 ; MOB I P PRE i:MOVE RIG FROM S PAD TO E PAD 19:00 - 20:00 1.00 MOB I P 1 PRE 'PLACE RIG MATS AROUND E-36 WELL FOR RIG. 20:00 - 21:00 1.00 MOB P I PRE PJSM. SPOT AND SET RIG ON E-36. RIG ACCEPTED AT 2100 HOURS 21:00 - 00:00 3.00 BOPSUR P PRE -PJSM PU 2"COIL -NIPPLE UP BOPE 6/28/2014 00:00 - 03:30 3.50 BOPSUR I P PRE NIPPLE UP BOPE AND LUBRICATOR. i -RIG UP REEL AND INNER REEL IRON. 03:30 - 04:00 0.50 BOPSUR I P I PRE FILL STACK WITH WATER AND SHELL TEST BOPE TO 250/4500 PSI. 04:00 - 08:30 4.50 BOPSUR P PRE INSTALL GRAPPLE IN COIL AND PULL TEST SAME. PJSM. PULL COIL ACROSS AND STAB IN I :INJECTOR. II MAKE UP PACKOFF TO INJECTOR. _ 1 I I SEND OUT CENTRIFUGE BOX. 08:30 - 15:30 , 7.00 BOPSUR I P PRE STATE GIVEN 24 NOTIFICATION OF BOP TEST 1 AT 18:33 HOURS ON 6/26/2014. STATE INSPECTOR LOU GRIMALDI WAIVED WITNESS I I PRESSURE TEST ALL BOP EQUIPMENT AS PER AOGCC REGS,SUNDRY 314-273,AND I CRT-AK-10-45 -TEST BOPE TO 250/3500 PSI FOR 5/5 CHARTED MIN -TEST CHOKE VALVES,CHOKE AND KILL HCR VALVES,INSIDE MANUAL VALVES ON CHOKE AND KILL LINES,BOP RAMS AND ANNULAR PREVENTER -LOWER 2"PIPE RAMS TESTED WITH 2"PIPE I-MIDDLE 2-3/8"COMBI RAMS TEST WITH 2-3/8"PIPE. -UPPPER 2"PIPE RAMS TESTED WITH 2" -ANNULAR TESTED WITH BOTH 2-3/8"AND 2" PIPE TEST 2 FULL OPENING SAFETY VALVES -FUNCTION BOPE FROM BOTH REMOTE I PANELS I -TEST GAS ALARMS I-PERFORM DRAW DOWN TEST OF IACCUMULATOR I I I-ALL TESTS WITNESSED BY TOOLPUSHER AND WSL I-NO FAILURES I '-PUMP SLACK FORWARD ' -TEST INNER REAL REEL VALVE AND PACK OFF AND BALL DROP 15:30 - 16:00 0.50 CLEAN P PRE RIG EVACUATION/H2S DRILL,AAR 16:00 - 00:00 8.00 CLEAN N HMAN PRE PJSM.RIG UP COIL CUTTER AND CUT 3000' OF COIL Printed 7/21/2014 10:30:00AM I North America-ALASKA-BP Page 2 of 11 Operation Summary Report Common Well Name:E-36 AFE No Event Type:RE-ENTER-ONSHORE(RON) 1 Start Date:6/27/2014 End Date:7/9/2014 X3-015DD-C:(3,025,583.00) Project:Prudhoe Bay I Site:PB E Pad Rig Name/No.:NORDIC 2 Spud Date/Time:6/12/1995 12:00:00AM Rig Release:7/12/2014 Rig Contractor:NORDIC CALISTA UWI:500292256300 Active datum:ORIG KELLY BUSHING @64.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT ! NPT Depth Phase Description of Operations (hr) (usft) 6/29/2014 100:00 - 00:30 0.50 CLEAN N HMAN PRE FINISH CUTTING 3000'OF COIL. 00:30 - 01:00 0.50 CLEAN P PRE PERFORM H2S RIG EVACUATION DRILL AND _HOLD AAR. 01:00 - 06:30 5.50 CLEAN P PRE PERFORM SLACK MANAGEMENT. GET ON WELL. ATTEMPT TO PUMP SLACK FORWARD-NO MOVEMENT. LINE UP AND PUMP 3/4"DRIFT BALL AND 'CIRCULATE AROUND-BALL RECOVERED AFTER 38.6 BBL RECOVERED. TERMINATE E-LINE. REVERSE SLACK INTO COIL. CUT 280'OF COIL. M/U SLB CTC-PULL AND PRESSURE TEST. GET ON WELL. PUMP SLACK FORWARD. POP OFF INJECTOR AND HEAD UP BHI SUPPER QUICK CONNECT. 06:30 - 07:30 1.00 CLEAN P PRE I PRESSURE TEST CHECKS AND LUBRICATOR PASS. 07:30 - 08:00 0.50 CLEAN P PRE PICKUP VALVE SHOP LUBRICATOR AND !TOOLS AND MAKE UP. 08:00 - 08:30 0.50 CLEAN P i PRE I TEST LUBRICATOR TO 250 PSI LOW,3500 PSI 'HIGH FOR 5 CHARTED MINUTES EACH- PASS. 08:30 - 09:30 1.00 CLEAN P ! PRE PULL TWC.CHECK FOR PRESSURE.WELL ON A VACUUM.RIG DOWN LUBRICATOR AND LAY DOWN. 09:30 - 10:00 0.50 CLEAN P PRE j INSTALL NIGHT CAP AND PRESSURE TEST TO 250 PSI LOW,3500 PSI HIGH. 10:00 - 11:30 1.50 CLEANT P PRE LINE UP AND BULLHEAD KILL THE WELL WITH 250 BBLS 1%KCL WATER. PUMP 6 BBLS OF METHANOL AT 1 BPM WITH j 624 PSI AT START,723 PSI AT END. FOLLOW WITH KCL.OA-70 PSI,IA-140 PSI. AT 10 BBLS AWAY,PUMPAT 3 BPM WITH 2075 PSI WELLHEAD PRESSURE. 1 AT 15 BBLS AWAY,PUMP AT 4 BPM WITH 2300 PSI WELLHEAD PRESSURE. OA-90 PSI,IA-175 PSI. AT 30 BBLS AWAY,PUMP AT 3 BPM WITH 3300 PSI WELLHEAD PRESSURE. AT 50 BBLS AWAY,PUMP AT 3 BPM WITH 3500 PSI WELLHEAD PRESSURE. OA-180 PSI,IA-340 PSI. AT 80 BBLS AWAY,PUMP AT 3 BPM WITH 3490 PSI WELLHEAD PRESSURE. OA-330 PSI,IA-440 PSI. AT 133 BBLS AWAY,PUMP AT 3 BPM WELLHEAD PRESSURE STARTING TO RISE ABOVE 3500 PSI.SHUT DOWN AND MAKE NOTIFICATIONS. OA-485 PSI,IA-500 PSI. CHECK FOR FLOW,NO FLOW SO ESTABLISH LOSS RATE BEFORE DOING FULL FLOW CHECK.LOSSES AT 9 BPH WHILE PUMPING 1 OVER THE TOP. Printed 7/21/2014 10:30,OOAM North America-ALASKA-BP Page 3 of 11 Operation Summary Report Common Well Name:E-36 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:6/27/2014 End Date:7/9/2014 X3-015DD-C:(3,025,583.00) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.:NORDIC 2 Spud Date/Time:6/12/1995 12:00:00AM Rig Release:7/12/2014 Rig Contractor:NORDIC CALISTA UWI:500292256300 Active datum:ORIG KELLY BUSHING©64.10usft(above Mean Sea Level) Date From-To Hrs Task • Code NPT NPT Depth Phase , Description of Operations (hr) (usft) 11:30 - 12:00 0.50 CLEAN P PRE PERFORM A FLOW CHECK NO FLOW. FORMULATE PLAN WITH WTLAND ODE TO RUN IN THE HOLE WITH THE WHIPSTOCK AND SET.RELEASE AND DISPLACE THE WELL WITH 8.8 PPG MILLING FLUID.RUN IN HOLE ON CHOKE TAKING RETURNS TO THE FLOW BACK TANK THEN DISPLACE 1 THROUGH THE CHOKE TO THE FLOW BACK TANK.PLAN APPROVED. !LINE UP PITS TO OFFLOAD KCL AND TAKE ON 8.8 PPG MILLING FLUID. 12:00 - 13:00 1.00 STWHIP P WEXIT TEST INJECTOR LUBRICATOR AND FINISH LINING UP PITS AND TAKING ON FLUID. 'VERIFY WHIPSTOCK LOAD OUT CHECK LIST WITH BAKER THROUGH TUBING. 13:00 - 14:00 1.00 STWHIP P WEXIT MAKE UP WHIPSTOCK BHA WITH MWD TOOLS.SCRIBE TOOL TO WHIPSTOCK SLIDE FACE AND RUN IN HOLE. 14:00 - 14:30 0.50 STWHIP P WEXIT STAB INJECTOR ONTO BHA MAKE UP QUICK TEST SUB.TEST TO 250 PSI LOW,3500 PSI HIGH FOR 5 CHARTED MINUTES EACH- PASS. 14:30 - 17:00 2.50 STWHIP P WEXIT RIH WITH WHIPSTOCK AND SETTING TOOL 1 AT 80 FPM WITH 14K DOWN WEIGHT.PUMP AT MINIMAL RATE WITH EDC OPEN AT 0.5 BPM WITH 210 PSI.RIH TO 9,250'MD. 17:00 - 18:00 1.00 STWHIP P WEXIT LOG GAMMA RAY TIE-IN FROM 9,250'MD.LOG AT 3 FPM WITH 22K DOWN WEIGHT.PUMP AT 0.5 BPM WITH 290 PSI. 18.00 - 21:00 3.00 STWHIP P I WEXIT SET WHIPSTOCK WITH TOWS AT 9,520'MD SHEARED OUT AT 2800 PSI. SET 3 K-LBS DOWN TO CONFIRM SET. DISPLACE TO 8.8 POWER PRO FLOW CHECK FOR 30 MINUTES PT WHIPSTOCK PACKER TO 1000 PSI FOR 5 MIN. CHARTED TEST,NO PRESSURE LOSS +OBSERVED. 21:00 - 22:45 1.75 STWHIP P WEXIT ,POOH F/9520'TO 70'AT 100 FPM PUMPING 1.07 BPM W/1650 PSI. 22:45 - 23:30 0.75 STWHIP P WEXIT PJSM POP OFF INJECTOR. LAY DOWN WHIPSTOCK BHA. 23:30 - 00:00 0.50 STWHIP P WEXIT PJSM MAKE UP WINDOW MILL BHA. GAUGE MILLS: -WINDOW MILL:2.74"GO,2.73"NO-GO -STRING MILL:2.74"NO-GO STAB COIL,GET ON WELL,TEST QTS 250/3500 PSI. 6/30/2014 00:00 - 00:15 0.25 STWHIP P WEXIT FINISH TESTING QTS 250/3500 PSI. 00:15 - 03:00 2.75 STWHIP P WEXIT RIH W/MILLING BHA F/110.9'MD TO 9,521'MD AT 100 FPM,PUMPING 0.5 BPM W/1075 PSI. LOG TIE-IN W/+3.5'CORRECTION. DRY TAGGED PINCH POINT AT 9,522'. TAGGED PINCH POINT AT 9,521.3'MD W/ PUMPS ON. Printed 7/21/2014 10:30:OOAM North America-ALASKA-BP Page 4 of 11 Operation Summary Report Common Well Name:E-36 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:6/27/2014 I End Date:7/9/2014 X3-015DD-C:(3,025,583.00) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.:NORDIC 2 Spud Date/Time:6/12/1995 12:00:OOAM Rig Release:7/12/2014 Rig Contractor:NORDIC CALISTA UWI:500292256300 Active datum:ORIG KELLY BUSHING©64.10usft(above Mean Sea Level) Date From-To Hrs Task I Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 09:00 6.00 STWHIP P WEXIT TIME MILL WINDOW AS PER PROCEDURE 'AND BTT FROM 9,521.3'TO 9,526.6'. PUMP RATE:1.6 BPM IN,1.6 BPM OUT MW IN/OUT:8.87 PPG/8.73 PPG. CIRC PRESSURE:2975 PSI ,DHWOB:1.65 K-LBS 09:00 - 10:00 1.00 STWHIP P WEXIT TIME MILL UNTIL ENTIRE STRING REAMER EXITS CASING AT 9527.6' 1 FT/HR,1.6 BPM AT 2950 PSI. 10.00 - 15.00 5.00 STWHIP P WEXIT DRILL RATHOLE FROM 9527.6 TO 9536.5'. 1.5K#DHWOB,1-3 FPH 1.6 BPM IN/OUT AT 2960 PSI CIRC PRESSURE !9.5 PPG ECD WITH 8.8 PPG POWER PRO IN/OUT PVT=332 BBLS,IAP=400 PSI,OAP=660 PSI. BLEED OA FROM 700 TO 100 PSI AT 1400. SAMPLE OF 90%FORMATION COLLECTED CONFIRMING KOP.30%OF FORMATION IS CHERT AND PYRITE. 15 00 - 16:15 1.25 STWHIP P WEXIT DRESS AND DRY DRIFT WINDOW,SLIGHT INCREASE OF MW AT TOP OF WINDOW ON - FIRST PASS,CLEAR ON 2ND AND 3RD PASSES.DRY DRIFT TO 9537.2'. 16:15 - 18:30 2.25 STWHIP P WEXIT ABOVE WINDOW,FLOW CHECK 5 MIN,NO FLOW.OPEN EDC. POH PUMPING 1.7 BPM AT 235.0 PSI. _ 18:30 - 19:00 0.50 STWHIP P WEXIT 1 LD WINDOW MILLING BHA !GAUGE MILLS WINDOW MILL:2.74"GO;2.73"NO GO STRING MILL:2.74"NO GO 19:00 - 20:00 1.00 DRILL P ( PROD1 PJSM PU BUILD BHA. STAB COIL GET ON WELL.TEST QTS 250/3500 PSI 20:00 - 22:30 2.50 DRILL P PROD1 RIH F/71'TO 9537'MD AT 100 FPM,PUMPING 0.5 BPM W/950 PSI.LOG TIE-IN W/-1" CORRECTION GET SLOW PUMP RATES W/BOTH PUMPS. 22:30 - 00:00 1.50 DRILL P PROD1 DRILL F/9535'T/9581'MD 0.7-1.5K#DHWOB,30-40 FPH 1.6 BPM IN/OUT AT 2960 PSI CIRC PRESSURE FREE SPIN:2780 PSI. 9.5 PPG ECD WITH 8.8 PPG POWER PRO IN/OUT PVT=332 BBLS,IAP=475 PSI,OAP=212 PSI. 7/1/2014 00:00 - 06:00 6.00 DRILL P PROD1 DRILL F/9581'TO 9740'MD 1.0-1.5K#DHWOB,15-40 FPH 1.6 BPM IN/OUT AT 2960 PSI CIRC PRESSURE FREE SPIN:2780 PSI. 9.5 PPG ECD WITH 6.8 PPG POWER PRO IN/OUT PVT=333 BBLS,IAP=509 PSI,OAP=239 PSI. 06:00 - 09:00 3.00 DRILL P PROD1 DRILL F/9740' to 9810'MD 1.0-1.5K#DHWOB,20-40 FPH 1.6 BPM IN/OUT AT 2910 PSI CIRC PRESSURE FREE SPIN:2760 PSI. 9.6 PPG ECD WITH 8.8 PPG POWER PRO IN/OUT PVT=335 BBLS,IAP=580 PSI,OAP=325 PSI. Printed 7/21/2014 10.30.00AM North America-ALASKA-BP Page 5 of 11 Operation Summary Report Common Well Name:E-36 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:6/27/2014 End Date:7/9/2014 X3-015DD-C:(3,025,583.00) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.:NORDIC 2 Spud Date/Time:6/12/1995 12:00:00AM .Rig Release:7/12/2014 Rig Contractor:NORDIC CALISTA UWI:500292256300 Active datum:ORIG KELLY BUSHING©64.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 13:30 4.50 DRILL P PROD1 DRILL F/9810'TO 9850'MD 1.0-1.5K#DHWOB,10-20 FPH 1.6 BPM IN/OUT AT 2960 PSI CIRC PRESSURE FREE SPIN:2780 PSI. 9.5 PPG ECD WITH 8.8 PPG POWER PRO !IN/OUT PVT=333 BELS,IAP=625 PSI,OAP=354 PSI. 13:30 - 16:00 2.50 DRILL P PROD1 POOH WITH BUILD BHA F/9850'-250'MD. -POWER DOWN TOOLS I-HELD PJSM FOR LD BUILD BHA -LD BUILD BHA/INSPECT TOOLS 16:00 - 17:00 1.00 DRILL P PROD1 PREPARE DIRECTIONAL MOTOR FOR LATERAL RUN -ADJUST AKO TO 0.8 DEGREES -INSPECT MWD TOOLS -HELD PJSM FOR PU LATERAL BHA '17:00 - 17:30 0.50 DRILL P PROD1 I MU 3.25"LATERAL BHA -GET ONTO WELL WITH INJECTOR PRESSURE TEST QTS 250/3500(PASSED) 17:30 - 22:00 4.50 DRILL P PROD1 1 RIH WITH LATERAL BHA i-BPM IN/OUT:0.37/0.73 MW IN/OUT:8.8 PPG/8.76 PPG -PERFORM LONG TIE IN+9'CORRECTION -CONFIRM TOP OF WINDOWAT 9522'RA TAG DEPTH AT 9527'. 22:00 - 00:00 2.00 DRILL P PROD1 ,DRILL AHEAD F/9850'T/9890' 11.0-1.5K#DHWOB,20-40 FPH 1.6 BPM IN/OUT AT 2960 PSI CIRC PRESSURE i FREE SPIN:2736 PSI. 9.6 PPG ECD WITH 8.8 PPG POWER PRO IN/OUT PVT=329 BBLS,IAP=625 PSI,OAP=354 PSI. 7/2/2014 00:00 - 06:00 6.00 DRILL P PROD1 DIRECTIONAL DRILL 3-1/4"LATERAL HOLE F/ 19890'T/10,100' '0.71-1.5K#DHWOB,20-50 FPH 1.6 BPM IN/OUT AT 2960 PSI CIRC PRESSURE I FREE SPIN:2750 PSI. 9.6 PPG ECD WITH 8.8 PPG POWER PRO IN/OUT PVT=326 BBLS,IAP=696 PSI,OAP=375 PSI. FOUND HOT AT 9865'/9007'MD/TVD. 06:00 - 06:30 0.50 DRILL P PROD1 I CREW CHANGE OUT I-PERFORM RIG WALK-AROUNDS INSPECT TOOLS AND EQUIPMENT 06:30 - 13:30 7.00 DRILL P PROD1 DIRECTIONAL DRILL 3-1/4"LATERAL SECTION F/10,100'-10,280'MD -BPM IN/OUT:1.61/1.61 CIRC PSI:2950 -MW IN/OUT:8.87 PPG/8.77 PPG -OA/IA/ECD:750/450/9.61 PPG DHWOB:1-3K,PVT-315 13:30 - 16:00 2.50 DRILL P PROD1 DECISION MADE TO POOH TO CHANGE BIT -GOOD INDICATION OF MOTOR WORK -GOOD INDICATION OF WEIGHT TRANSFER TO BIT -MUD PROPERTIES STILL EFFECTIVE -POOH F/10,280'-9,500'MD 1-FLOW CHECK-NO FLOW I-OPEN EDC POOH PUMPING MAX RATE -BPM IN/OUT:2.08/1.72 -MW IN/OUT:8.87 PPG/8.78 PPG -FLOW CHECK AT SURFACE-NO FLOW Printed 7/21/2014 10:30:OOAM North America-ALASKA-BP Page 6 of 11 Operation Summary Report Common Well Name:E-36 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:6/27/2014 End Date:7/9/2014 X3-015DD-C:(3,025,583.00) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.:NORDIC 2 Spud Date/Time:6/12/1995 12:00:00AM Rig Release:7/12/2014 Rig Contractor:NORDIC CALISTA UWI:500292256300 Active datum:ORIG KELLY BUSHING©64.1ousft(above Mean Sea Level) Date I From-To Hrs 1 Task 1 Code NPT NPT Depth Phase Description of Operations (hr) 1 (usft) — — 16:00 - 16:30 0.50 1 DRILL P PROD1 CHANGE BIT 1 -GET OFF WELL WITH INJECTOR -BREAK OFF USED HYC BIT#SRFX3208M -MAKE UP NEW HUGHES BIT#7036449 -GET ONTO WELL WITH INJECTOR -PRESSURE TEST QTS 250/3.500(PASSED) 116:30 - 19:30 3.00 DRILL P PROD1 RIH WITH LATERAL BHA BPM IN/OUT:0.51/0.86 -MW IN/OUT:8.81 PPG/8.76 PPG -PERFORM TIE IN+7'CORRECTION -CONFIRM TOP OF WINDOW AT 9522'RA TAG DEPTH AT 9527'. 19.30 - 00:00 4.50 DRILL P PROD1 DIRECTIONAL DRILL 3-1/4"LATERAL SECTION F/10280'T/10378' -BPM IN/OUT:1.61/1.61 CIRC PSI:2971 -MW IN/OUT:8.61 PPG/8.47 PPG -OA/IA/ECD:750/409/9.61 PPG -DHWOB:1-3K,PVT-378 7/3/2014 00:00 - 07:00 7.00 DRILL P PROD1 DIRECTIONAL DRILL 3-1/4"LATERAL SECTION F/10378'T/10491' -BPM IN/OUT:1.59/1.60 CIRC PSI:3100 PSI -MW IN/OUT:8.61 PPG/8.47 PPG -OMA/ECD:265/73/9.61 PPG -DHWOB:1-3K,PVT-378 BLED OFF IA AND OAAT 03:00 07:00 - 09:30 2.50 DRILL P PROD1 DECISION MADE TO POOH TO CHANGE BIT -GOOD INDICATION OF MOTOR WORK 1-GOOD INDICATION OF WEIGHT TRANSFER TO BIT -MUD PROPERTIES STILL EFFECTIVE GEOLOGY SAMPLES SHOWING 50-60% CHERT -POOH F/10,514'-9,500'MD -FLOW CHECK-NO FLOW OPEN EDC POOH PUMPING MAX RATE -BPM IN/OUT:2.08/1.72 -MW IN/OUT:8.60 PPG/8.48 PPG -FLOW CHECK AT SURFACE-NO FLOW 09:30 - 10:00 0.50 I DRILL P ' PROD1 CHANGE BIT 1-GET OFF WELL WITH INJECTOR BREAK OFF USED HYC BIT#SRFX3208M -MAKE UP NEW HUGHES BIT#7036449 j-GET ONTO WELL WITH INJECTOR -PRESSURE TEST QTS 250/3500(PASSED) 10:00 - 13:00 3.00 DRILL P PROD1 RIH WITH LATERAL BHA -BPM IN/OUT:0.51/0.86 -MW IN/OUT:8.81 PPG/8.76 PPG -PERFORM TIE IN-2'CORRECTION 13:00 - 13:30 0.50 DRILL P PROD1 RIH F/9250'-10,214'MD -TAG UP HARD AT 10,214'MD -ATTEMPT TO GET PAST 10,214'MD(NO PROGRESS) 13:30 - 14:30 1.00 DRILL N SFAL 10,514.00 PROD1 POOH F/10,214'-9522'MD TO CONFIRM TIE-IN -DID NOT SEE RA LOG INTERVAL(NO CORRECTION MADE) RIH TO 10,214'MD(CHANGE SLB DEPTH TO 1 110,514'MD) -POOH F/10,514'TO 9450'MD -OPEN EDC,CIRCULATE IN CASED HOLE Printed 7/21/2014 10:30 OOAM North America-ALASKA-BP Page 7 of 11 Operation Summary Report Common Well Name:E-36 AFE No Event Type:RE-ENTER-ONSHORE(RON) ! Start Date:6/27/2014 End Date:7/9/2014 X3-015DD-C:(3,025,583.00) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.:NORDIC 2 Spud DateTme:6/12/1995 12:00:00AM Rig Release:7/12/2014 Rig Contractor:NORDIC CALISTA UWI:500292256300 Active datum:ORIG KELLY BUSHING(§64.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 14:30 - 18:30 4.00 DRILL N SFAL 10,514.00 PROD1 TROUBLESHOOT INJECTOR COUNTER !-CALL FOR SLB MECHANIC TO REPAIR COUNTER ASSEMBLY -REMOVED COUNTER ASSEMBLY -TROUBLESHOOT COUNTER ASSEMBLY WITH SLB MECHANIC -REPAIR COUNTER ASSEMBLY AS NEEDED -RE-INSTALL COUNTER ASSEMBLY AND TEST SAME 18:30 - 20:30 2.00 DRILL N SFAL 10,514.00 PROD1 1RIH WI LATERAL BHA F/9200'AND LOG TIE IN W/-6'CORRECTION. CONTINUE TO LOG DOWN AT 2.5 FPM TO RA TAG. CONFIRM RA STAG AT 9527'. 20:30 - 22:00 1.50 DRILL N SFAL 10,514.00 PROD1 'RIH W/LATERAL BHA F/9562'TO 10514'MD AT 20 FPM. -BPM IN/OUT:0.75/0.82 CIRC PSI:1750 PSI -MW IN/OUT:8.61 PPG/8.48 PPG -OA/IA/ECD:27/0/9.33 PPG PVT:355 BBL 22:00 - 00:00 2.00 DRILL P PROD1 DIRECTIONAL DRILL 3-1/4"LATERAL SECTION F/10514'T/10540' -BPM IN/OUT:1.59/1.62 CIRC PSI:3200 PSI -MW IN/OUT:8.61 PPG/8.48 PPG -OA/IA/ECD:111/0/9.56 PPG -DHWOB:0.74-3K,PVT-355 7/4/2014 00:00 - 05:30 5.50 DRILL P PROD1 !DIRECTIONAL DRILL 3-1/4"LATERAL SECTION F/10540'T/10571' -BPM IN/OUT:1.51/1.52 CIRC PSI:2966 PSI -MW IN/OUT:8.61 PPG/8.48 PPG OA/IA/ECD:284/109/9.56 PPG -DHWOB:0.74-3K,PVT:373 ROP SLOWED DOWN TO<10 FPH AT-10,550' I MD. UNABLE TO DETERMINE IF DROP IN ROP IS FORMATION,OR BIT RELATED. SAMPLES SHOW 50%TO 60%CHERT IN FORMATION. GAMMA SENSOR HAS NOT YET REACHED I SLOW INTERVAL. PUMPED 20 BBL HI-VIS SWEEP NO NOTICABLE INCREASE IN CUTTINGS ACROSS —I SHAKER. AKER. 05:30 08:00 2.50 DRILL PROD1 POH W/3-1/4"LATERAL BHA F/10571'TO 9500'AT 25 FPM PUMPING 1.51 BPM W/2970 PSI AND PICK UP WEIGHT 38K-LBS. FLOWCHECK AND CLOSE EDC AT 9500'MD. FLOW CHECK ON SURFACE. 08:00 - 08:30 0.50 DRILL P PROD1 HELD PJSM FOR LD LATERAL BHA I-STAND BACK INJECTOR -BREAK OFF BIT(GRADE 4-4 RINGING ON NOSE) -INSPECT TOOLS AND EQUIPMENT 08:30 - 11:30 3.00 DRILL N SFAL PROD1 HYDRAULIC PRESSURE GAUGE LEAKING ON INJECTOR !-ATTEMPT TO REMOVE AND REPAIR GUAGE -GUAGE THREADS BREAK OFF INSIDE HYDRAULIC LINE ATTEMPT TO REMOVE BROKEN THEADS FROM HYDRAULIC LINE -CALLED FOR SLB MECHANIC TO REMOVE AND REPAIR BROKEN ITEM Printed 7/21/2014 10:30:00AM North America-ALASKA-BP Page 8 of 11 Operation Summary Report Common Well Name:E-36 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:6/27/2014 i End Date:7/9/2014 X3-015DD-C:(3,025,583.00) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.:NORDIC 2 Spud Date/Time:6/12/1995 12:00:00AM Rig Release:7/12/2014 Rig Contractor:NORDIC CALISTA UWI:500292256300 Active datum:ORIG KELLY BUSHING @64.10usft(above Mean Sea Level) Date ; From-To I Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 11:30 - 12:00 0.50 DRILL P PROD1 CHANGE BHI CHECKS -PRESSURE TEST 250/3500(PASSED) 12:00 - 12:30 0.50 DRILL P PROD1 MU 3-1/4"LATERAL BHA -GET ONTO WELL WITH INJECTOR -PRESSURE TEST QTS 250/3500(PASSED) 12:30 - 15:00 2.50 DRILL P PROD1 RIH WITH LATERAL BHA -BPM IN/OUT:0.51/0.86 -MW IN/OUT:8.54 PPG/8.47 PPG -PERFORM TIE IN+2'CORRECTION -RIH TO 10,551'MD TAG UP 15:00 - 16:15 1.25 DRILL 1 P PROD1 REAM HOLE SECTION F/10,450'-10,563'MD -TIGHT HOLE SECTION F/10,550'-10,563'MD. -TAG BOTTOM @ 10,563'MD 16:15 - 21:00 4.75 DRILL P PROD1 DIRECTIONAL DRILL 3-1/4"LATERAL SECTION F/10563'-10,651' -BPM IN/OUT:1.57/1.57 CIRC PSI:3204 PSI -MW IN/OUT:8.61 PPG/8.47 PPG -OA/IA/ECD:176/9/9.59 PPG -DHWOB:0.75-3K,PVT:362 21:00 - 00:00 3.00 DRILL P PROD1 DIRECTIONAL DRILL 3-1/4"LATERAL SECTION F/10,651'-10,712' -BPM IN/OUT:1.61/1.63 CIRC PSI:3373 PSI -MW IN/OUT:8.61 PPG/8.49 PPG -OA/IA/ECD:172/380/9.64 PPG -DHWOB:0.75-3K,PVT:350 7/5/2014 00:00 - 03:00 3.00 DRILL P PROD1 DIRECTIONAL DRILL 3-1/4"LATERAL SECTION F/10,717-10,733' -BPM IN/OUT:1.61/1.63 CIRC PSI:3373 PSI -MW IN/OUT:8.61 PPG/8.49 PPG -OA/IA/ECD:172/380/9.64 PPG -DHWOB:0.75-3K,PVT:350 03:00 - 03:45 0.75 DRILL P PROD1 PJSM. POH W/3-1/4"LATERAL BHA F/10,733' TO 9,500'MD AT 30 FPM. -BPM IN/OUT:1.44/1.32 CIRC PSI:2725 PSI 1 1-MW IN/OUT:8.61 PPG/8.49 PPG -OA/IA/ECD:179/380/9.55 PPG -PVT:347 BBL 03:45 - 04:00 0.25 DRILL P PROD1 FLOWCHECK WELL-STATIC -OPEN EDC 04:00 - 06:30 2.50 DRILL P PROD1 POH W/3-1/4"LATERAL BHA F/9,500'MD TO 150'AT 100 FPM. BPM IN/OUT:1.87/1.64 CIRC PSI:3025 PSI 1-MW IN/OUT:8.61 PPG/8.49 PPG -OA/IA/ECD:166/333/9.31 PPG -PVT:335 BBL 06:30 - 07:00 0.50 DRILL P PROD1 CHANGE OUT BIT/FUNCTION TEST FLOW CHECK AT SURFACE(NO FLOW) 1-STAND INJECTOR BACK -STAND BACK DIRECTION TOOLS -FUNCTION TEST BOP FROM XXX PANEL 07:00 - 07:30 0.50 DRILL P PROD1 MU 3-1/4"LATERAL BHA� i -GET ONTO WELL WITH INJECTOR 1-PRESSURE TEST QTS 250/3500_(PASSED) 07:30 - 10:30 3.00 DRILL P PROD1 RIH WITH LATERAL BHA -BPM IN/OUT:0.83/1.22 -MW IN/OUT:8.57 PPG/8.47 PPG • -PERFORM TIE IN-1'CORRECTION -RIH TO 10,734'MD 10:30 - 11:00 0.50 DRILL P PROD1 PERFORM H2S RIG EVACUATION DRILL WITH 1 AAR. Printed 7/21/2014 10:30:00AM North America-ALASKA-BP Page 9 of 11 Operation Summary Report Common Well Name:E-36 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:6/27/2014 End Date:7/9/2014 X3-015DD-C:(3,025,583.00) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.:NORDIC 2 Spud Date/me:6/12/1995 12:00:00AM Rig Release:7/12/2014 Rig Contractor.NORDIC CALISTA - i UW1:500292256300 Active datum:ORIG KELLY BUSHING©64.10usft(above Mean Sea Level) Date From-To I Hrs Task Code 1 NPT 1 NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 18:00 7.00 DRILL P PROD1 DIRECTIONAL DRILL 3-1/4"LATERAL SECTION F/10,734'-10,873' 1-BPM IN/OUT:1.61/1.61 CIRC PSI:3358 PSI -MW IN/OUT:8.61 PPG/8.49 PPG -OA/IA/ECD:315/140/9.68 PPG -DHWOB:0.75-3K,PVT:335 I "'"NOTE:LOST 15-20 BBLS MUD AT 15,735' ,MD.LOSSES HEALED UP WITHIN 15 MINS""" 18:00 - 19:30 1.50 DRILL P PROD1 rDIRECTIONAL DRILL 3-1/4"LATERAL SECTION F/10,873'-10,887' '-BPM IN/OUT:1.61/1.61 CIRC PSI:3182 PSI -MW IN/OUT:8.63 PPG/8.50 PPG -OA/IA/ECD:190/382/9.68 PPG -DHWOB:0.75-3K,PVT:324 19:30 - 22:00 2.50 DRILL P PROD1 ,POH WITH LATERAL BHA. 1-BPM IN/OUT:0.55/0.35 -MW IN/OUT:8.63 PPG/8.50 PPG 22 00 - 22:30 0.50 DRILL P PROD1 PERFORM H2S RIG EVACUATION DRILL WITH AAR. 2230 - 23:00 0.50 DRILL P PROD1 HANG BHA. CHANGE OUT BIT. 2300 - 00:00 1.00 DRILL P PROD1 C/O SLB PACK OFF AND TEST TO 250/3500PSI LO/HI 7/6/2014 00.00 - 03:45 3.75 DRILL P--tPROD1 'RIH W/3-1/4"BHA. STAB COIL.GET ON WELL. TEST QTS 250/3500 PSI. I RIH W/3-1/4"LATERAL BHA ON COIL TO 10,887'MD. -BPM IN/OUT:0.50/0.65 -MW IN/OUT:8.57 PPG/8.47 PPG -PERFORM TIE IN-1'CORRECTION 03:45 - 06:00 2.25 DRILL P PROD1 DIRECTIONAL DRILL 3-1/4"LATERAL SECTION F/10,887'-10,941' BPM IN/OUT:1.50/1.50 CIRC PSI:3003 PSI -MW IN/OUT:8.64 PPG/8.52 PPG I -OA/IA/ECD:39/238/9.69 PPG DHWOB:0.71-1.1K,PVT:315 06:30 0.50 DRILL P PROD1 06:00 CREW CHANGE OUT PERFORM WALK AROUND INSPECTIONS -INSPECT TOOLS AND EQUIPMENT 06:30 - 16:30 10.00 DRILL P PROD1 DIRECTIONAL DRILL 3-1/4"LATERAL SECTION F/10,941'-11,350' '-BPM IN/OUT:1.60/1.60 CIRC PSI:3327 PSI ' 1-MW IN/OUT:8.69 PPG/8.55 PPG '-OA/IA/ECD:442/234/9.70 PPG -DHWOB:0.75-3K,PVT:313-300 ' 16:30 - 20 00 3.50 DRILL P PROD1 PERFORM WIPER TRIP F/11,350'-9,500'MD. BPM IN/OUT:1.61/1.50 CIRC PSI:3102 -MW IN/OUT:8.67 PPG/8.55 PPG i PUMP 20 BBLS SWEEP/DUMP 10 BBLS FROM SYSTEM -LOG TIE-IN(+6)CORRECTION -RIH F/9600'-11,350'MD. 20:00 - 00:00 4.00 DRILL P PROD1 t DIRECTIONAL DRILL 3-1/4"LATERAL SECTION F/11,350'-11,493' I-BPM IN/OUT:1.48/1.48 CIRC PSI:3065 PSI , -MW IN/OUT:8.69 PPG/8.56 PPG ' I -OA/IA/ECD:448/238/9.82 PPG -DHWOB:0.75-3K,PVT:293 Printed 7/21/2014 10:30:00AM North America-ALASKA-BP Page 10 of 11 Operation Summary Report Common Well Name:E-36 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:6/27/2014 End Date:7/9/2014 X3-015DD-C (3,025,583.00) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.:NORDIC 2 Spud Date/Time:6/12/1995 12:00:00AM I Rig Release:7/12/2014 Rig Contractor.NORDIC CALISTA UWI:500292256300 Active datum:ORIG KELLY BUSHING(@64.10usft(above Mean Sea Level) Date From-To Hrs Task , Code NPT NPT Depth Phase Description of Operations (hr) (usft) 7/7/2014 00:00 - 01:00 1.00 DRILL P PROD1 DIRECTIONAL DRILL 3-1/4"LATERAL SECTION F/11,493'-11,551' -BPM IN/OUT:1.48/1.48 CIRC PSI:3065 PSI -MW IN/OUT:8.69 PPG/8.56 PPG -OA/IA/ECD:448/238/9.82 PPG -DHWOB:0.75-3K,PVT:293 01:00 - 04:00 3.00 DRILL P PROD1 POH W/3-1/4"LATERAL BHA F/11,551'TO 71'. -BPM IN/OUT:1.89/1.52 CIRC PSI:2959 PSI -MW IN/OUT:8.70 PPG/8.57 PPG I -OA/IA/ECD:248/455/9.82 PPG -PVT:249 BBL 04:00 - 05:30 1.50 DRILL P I PROD1 �PJSM. BREAK AND UD LATERAL BHA. CHANGE OUT MUD MOTOR,AND BIT. MU NEW 3-1/4"LATERAL BHA W/NEW MUD MOTOR,AND NEW HYC 2.74"X 3.25" BICENTER BIT. i STAB COIL.GET ON WELL.TEST QTS 1250/3500. 05:30 - 09:00 3.50 DRILL P PROD1 I RIH W/3-1/4"LATERAL BHA ON COIL F/71'TO 111,551'MD. '-BPM IN/OUT:0.50/0.85 1-MW IN/OUT:8.63 PPG/8.55 PPG -PERFORM TIE IN-1.5'CORRECTION -RIH TO 11,551'MD. 09:00 - 15:00 6.00 DRILL P PROD1 DIRECTIONAL DRILL 3-1/4"LATERAL SECTION F/11,551'-11,652'MD ' 1-BPM IN/OUT:1.60/1.60 CIRC PSI:3105 PSI MW IN/OUT:8.69 PPG/8.55 PPG 1 -OMA/ECD:448/238/9.82 PPG -DHWOB:0.75-3K,PVT:281 PERFORM MUD SWAP TO NEW SYSTEM 15:00 - 18:30 3.50 DRILL P PROD1 POH W/3-1/4"LATERAL BHA F/11,652'TO 71'. I 1 -BPM IN/OUT:1.89/1.52 CIRC PSI:2959 PSI -MW IN/OUT:8.56 PPG/8.43 PPG -OMA/ECD:432/222/9.44 PPG -PVT:55 BBL I-FLOW CHECK AT WINDOW(NO FLOW) -POOH TO SURFACE 18'30 - 19'30 1.00 DRILL P PROD1 1 LD LATERAL BHA#10 AND PU LATERAL BHA #11 STAB COILAND TEST QTS 250/3500 19:30 - 23:30 4.00 DRILL P PROD1 RIH W/3-1/4"LATERAL BHA ON COIL F/71'TO 11,652'MD. ' -BPM IN/OUT:0.50/0.85 I 1 -MW IN/OUT:8.58 PPG/8.45 PPG I-PERFORM TIE IN-2'CORRECTION RIH TO 11,551'MD. 23:30 - 00:00 0.50 DRILL � P PROD1 DIRECTIONAL DRILL 3-1/4"LATERAL SECTION ' F/11,652'-11,660'MD -BPM IN/OUT:1.52/1.51 CIRC PSI:2769 PSI -MW IN/OUT:8.58 PPG/8.45 PPG -OMA/ECD:300/121/9.59 PPG -DHWOB:0.75-3K,PVT:374 7/8/2014 00:00 - 04:00 4.00 DRILL P PROD1 DIRECTIONAL DRILL 3-1/4"LATERAL SECTION F/11,660'-11,735'MD -BPM IN/OUT:1.52/1.51 CIRC PSI:2629 PSI -MW IN/OUT:8.58 PPG/8.45 PPG -OMA/ECD:142/331/9.59 PPG -DHWOB:0.75-3K,PVT:374 Printed 7/21/2014 10 30:00AM North America-ALASKA-BP Page 11 of 11 Operation Summary Report Common Well Name:E-36 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:6/27/2014 End Date:7/9/2014 X3-015DD-C:(3,025,583.00) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.:NORDIC 2 Spud Date/Time:6/12/1995 12:00:00AM Rig Release:7/12/2014 Rig Contractor:NORDIC CALISTA UWI:500292256300 Active datum:ORIG KELLY BUSHING @64.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:00 - 07:30 3.50 DRILL P PROD1 POH W/3-1/4"LATERAL BHA F/11,735'TO 71'. -BPM IN/OUT:1.89/1.52 CIRC PSI:2959 PSI -MW IN/OUT:8.56 PPG/8.43 PPG -OA/IA/ECD:432/222/9.44 PPG i-PVT:375 BBL FLOW CHECK AT WINDOW(NO FLOW) -POOH TO SURFACE. 07 30 - 08:30 1.00 DRILL P j PROD1 CHANGE OUT BIT/MWD TOOL -LD HUGHES BIT#7040958(GRADE4-1) -MU HYCALOG BIT#A198490 CHANGE OUT FLOAT VALVE ON MWD TOOL -GET ONTO WELL WITH INJECTOR -PRESSURE TEST QTS 250/3500(PASSED) 08 30 - 12:30 4.00 DRILL P PROD1 RIH W/3-1/4"LATERAL BHA ON COIL F/71'TO 111,735'MD. -BPM IN/OUT:0.50/0.85 MW IN/OUT:8.53 PPG/8.45 PPG -PERFORM TIE IN 0'CORRECTION -RIH TO 11,735'MD. 12 30 - 17:00 4.50 DRILL P PROD1 DIRECTIONAL DRILL 3-1/4"LATERAL SECTION F/11,735'-11,810'MD -BPM IN/OUT:1.60/1.60 CIRC PSI:3235 PSI i-MW IN/OUT:8.58 PPG/8.45 PPG -ONIA/ECD:442/231/9.59 PPG DHWOB:0.75-3K,PVT:346 L-GEOLOGY CALL TD 17:00 - 20:30 3.50 DRILL P PROD1 WIPER TO WINDOW F/11,810'TO 9500'MD. BPM IN/OUT:1.61/1.52 CIRC PSI:3054 PSI -MW IN/OUT:8.58 PPG/8.44 PPG -OA/IA/ECD:432/231/9.59 PPG -PVT:346 BBL -PERFORM TIE IN+2'DEPTH CORRECTION RIH TO BOTTOM CONFIRM TD TAG TD AT 11,808'MD 20:30 - 23:00 2.50 DRILL P PROD1 RECIP COIL WHILE CIRCULATE 2OBBL LO-VIS SWEEP POOH LAYING IN LINER RUNNING PILL WITH ALPINE BEADS. 23:00 - 00:00 1.00 DRILL P PROD1 POOH FROM WINDOW TO SURFACE -60'/MIN WITH 2.12/1.90 BPM IN/OUT -MW IN/OUT:8.59/8.48 PPG 7/9/2014 00:00 - 02:00 2.00 DRILL P PROD1 CONTINUE POOH TO SURFACE -60'/MIN WITH 2.12/1.90 BPM IN/OUT !-MW IN/OUT:8.59/8.48 PPG -FLOW CHECK ON SURFACE,NO FLOW 02:00 - 03:00 1.00 DRILL P i PROD1 PJSM AND LD DRILLING BHA POP OFF,UNSTAB,BLOW DOWN -LD COILTRAK -LD BIT AND MOTOR -BIT GRADE:4-1-RO-N-X-I-BU-TD CHANGE TO CON EVENT AT 03:00 07/09/2014. Printed 7/21/2014 10:30:00AM North America-ALASKA-BP Page 1 of 7 Operation Summary Report Common Well Name:E-36 AFE No Event Type:COM-ONSHORE(CON) Start Date:7/9/2014 End Date:7/12/2014 X3-015DD-C:(1,517,874.00) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.:NORDIC 2 Spud Date/Time:6/12/1995 12:00:00AM 'Rig Release:7/12/2014 Rig Contractor:NORDIC CALISTA UWI:500292256300 Active datum:ORIG KELLY BUSHING @64.10usft(above Mean Sea Level) Date From-To Hrs Task Code I NPT 1 NPT Depth Phase Description of Operations (hr) (usft) — 7/9/2014 03:00 - 04:30 1.50 i CASING jr P RUNPRD ,PJSM AND PUMP OUT SLACK I-BREAK OFF BHI HEAD,CUT OFF CTC PUMP OUT 175'SLACK,THEORETICAL 'SLACK 280' ,-SWAP REEL TO WARM WATER AND 'ATTEMPT TO PUMP OUT MORE SLACK,NO E-LINE MOVEMENT 04:30 RUNPRD PJSM AND INSTALL BTT CTC - 07:00 i 2.50 CASING P -BOOT E-LINE AND INSTALL CTC PULL TEST TO 35K#,GOOD TEST PRESS TEST TO 250/3500 PSI,FAIL -BREAK CTC AND REPLACE 0-RINGS -PRESS TEST OT 250/3500 PSI,FAIL -CUT OFF CTC AND REINSTALL -PULL TEST TO 35K#GOOD TEST -PRESS TEST TO 250/3500 PSI,GOOD TEST 07700 - 08:30 1.50 CASING P ' RUNPRD PJSM AND DRIFT REEL -PICK UP NOZZLE AND GET ON WELL -PUMP 3/4"DRIFT BALL i-GET OFF WELLAND LD NOZZLE,RECOVER DRIFT BALL 08:30 - 09:00 0.50 CASING P ' RUNPRD PJSM FOR MU AND RUNNING 2-3/8"LINER RU FLOOR TO RUN LINER VERIFIED LINER TALLY WITH WSL, TOOLPUSHER,BTT REP AND DRILLER 09:00 - 14:00 5.00 i CASING I P I RUNPRD RUN 2-3/8"LINER F/0'-3,093'MD '-PERFORMED TRIPPING DRILL WHILE RUNNING LINER i-COMPLEX DRILL KOOMEY DRILL AND AAR 1-GET ONTO WELL WITH INJECTOR -PRESSURE TEST QTS 250/3500(PASSED) VERIFIED PIPE COUNT PRIOR TO RUNNING IN HOLE. 14:00 - 17:00 3.00 CASING ' P RUNPRD RIH WITH 2-3/8"LINER F/3,093'-11,808'MD I(UNCORRECTED) -BPM IN/OUT:0.32/0.55 CIRC PSI:1150 -MW IN/OUT:8.54 PPG/8.48 PPG -TAG BOTTOM @ 11,809'MD (UNCORRECTED) -EOP FLAG VS CTDS DEPTH:(+9')OFFSET -RECORD PU WEIGHT:35K -POSITION REEL FOR BALL DROP -LOCK OUT REEL/LOAD BALL 17:00 - 17'30 0.50 CASING P RUNPRD !CIRCULATE 5/8"BALL TO SELBRT I-BPM IN/OUT:1.5/1.42 CIRC PSI:2800 MW IN/OUT:8.59 PPG/8.48 PPG -BALL ON SEAT AT 26 BBLS AWAY -RELEASE FROM SELBRT 17:30 - 19:30 2.00 CASING P I RUNPRD !SWAP WELL FROM 8.6 PPG MUD TO 8.4 KCL -BPM IN/OUT:1.6/1.54 CIRC PSI:1615 -MW IN/OUT:8.35 PPG/8.48 PPG 19:30 21:30 2.00 CASING P RUNPRD I RIG UP FOR CEMENT JOB -PREP RIG PITS AND TRUCK FOR CEMENT FLUID I I 1-RIG UP SLB CEMENTERS _ Printed 7/21/2014 10:30:28AM North America-ALASKA-BP Page 2 of 7 Operation Summary Report Common Well Name:E-36 AFE No Event Type:COM-ONSHORE(CON) Start Date:7/9/2014 End Date:7/12/2014 X3-015DD-C:(1,517,874.00) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.:NORDIC 2 Spud Date/Time:6/12/1995 12:00:00AM Rig Release:7/12/2014 Rig Contractor:NORDIC CALISTA UWI:500292256300 Active datum:ORIG KELLY BUSHING @64.1 ousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:30 - 22:30 1.00 CASING P RUNPRD PJSM AND PRESS TEST SLB CEMENTERS -WSL PERFORM PRESSURE CROSSCHECK CHECKLIST WITH SLB CEMENT LEAD -WSL VERIFY SLB TRIPS -PT TO 250/5500 PSI FOR 5/5 MIN,GOOD TEST 22:30 - 00:00 1.50 CASING P RUNPRD PJSM AND PUMP 11.4 BBLS 15.8 PPG CLASS G CEMENT BYPASS REEL FILTERS CIRC 1%KCL AT 1.54/1.48 BPM IN/OUT WITH 1330 PSI BATCH UP CEMENT '22:45-15 BBLS CMT TO WEIGHT,LOSS RATE =0.06 BPM 22:50-SWAP COIL PUMP TO EXHAUST PILL AND FLOOD LINES.SHUT DOWN RIG PUMP AND LINE UP CMT PUMP DOWN THE COIL. 23:00-ON LINE WITH CMT PUMP.ZERO IN MM AT 14.0 PPG DENSITY. 23:11-SHUT DOWN PUMP WITH 11.4 BBLS AWAY.SEND SLB CEMENTERS 5 BBLS WATER TO CLEAR LINES.BLOW DOWN CEMENT LINES. 23:15-ONLINE WITH RIG PUMP TO DISPLACE CMT WITH EXHAUST PILL. 23:32-WITH 36.0 BBLS AWAY,SLOW RATE TO 1.0 BPM TO AVOID SLAMMING LWP WITH CEMENT. 23:41-WITH 47.5 BBLS AWAY,SHUT DOWN PUMPS.PICK UP 12'PAST BREAKOVER TO 11,790'MD WITH 35K#.PUMP 5 BBLS SIDE EXHAUST TO 52.5 BBLS. 23:48-SLACK OFF TO 11,814'MD AND-2K#. ZERO IN MM.PRESSURE UP TO 3460 PSI AND LAUNCH LWP.DISPLACE AT 1.10 BPM AND 2850 PSI. 23:50-AT 1.8 BBLS AWAY,CEMENT AT SHOE. MM OUT TOTAL=50.4 BBLS.ZERO OUT MM. PIT MANUAL STRAP=284 BBLS. 00:02-PLUG BUMPED AT 11.5 BBLS.OUT MM AT 9.2 BBLS.HOLD 3400 PSI TO VERIFY PLUG IS SET.PIT MANUAL STRAP=292 BBL. 00:06-SHUT DOWN ALL CHARGE PUMPS. BLEED OFF COIL PRESSURE TO CHECK FLOATS. 00:10-GOOD NO FLOW ON THE FLOATS, CLOSE THE BAKER CHOKE AND PRESSURE UP TO 2500 PSI.PU TO 11,796'MD AND PRESSURE DROP.PUMP 5 BBLS OF EXHAUST PILL AT 0.5 BPM. 9.2 BBLS OF CMT BEHIND PIPE BASED ON OUT MM 8 BBLS OF CMT BEHIND PIPE BASED ON PIT STRAP Printed 7/21/2014 10:30:28AM NorthAmerica-ALASKA-BP Page3of7 Operation Summary Report Common Well Name:E-36 AFE No Event Type:COM-ONSHORE(CON) Start Date:7/9/2014 End Date:7/12/2014 X3-015DD-C:(1,517,874.00) Project:Prudhoe Bay I Site:PB E Pad Rig Name/No.:NORDIC 2 Spud Date/Time:6/12/1995 12:00:00AM Rig Release:7/12/2014 Ri Active odatum:ORIG KELLY BUSHING 64.10usft(above UWI:500292256300 � Mean Sea Level) Date From-To Hrs Task j Code NPT NPT Depth Phase I Description of Operations (hr) I (usft) 7/10/2014 00:00 - 00:30 0.50 CASING P i i RUNPRD CONTINUE PUMP 11.4 BBLS 15.8 PPG CLASS G CEMENT - I DISPLACE LWP THROUGH LINER. 00:02-PLUG BUMPED AT 11.5 BBLS.OUT MM AT 9.2 BBLS.HOLD 3400 PSI TO VERIFY PLUG IS SET.PIT MANUAL STRAP=292 BBL. 00:06-SHUT DOWN ALL CHARGE PUMPS. BLEED OFF COIL PRESSURE TO CHECK FLOATS. 00:10-GOOD NO FLOW ON THE FLOATS, CLOSE THE BAKER CHOKE AND PRESSURE UP TO 2500 PSI.PU TO 11,796'MD AND PRESSURE DROP.PUMP 5 BBLS OF 'EXHAUST PILL AT 0.5 BPM. 9.2 BBLS OF CMT BEHIND PIPE BASED ON OUT MM 8 BBLS OF CMT BEHIND PIPE BASED ON PIT TRAP 00.30 02:30 2.00 CASING P 1 POOH - I RUNPRD POOH WITH LINER RUNNING TOOLS -85'/MIN WITH 1.60/1.25 BPM IN/OUT -MW IN/OUT:8.34/8.29 PPG -FLOW CHECK ON SURFACE,NO FLOW 02 30 - 03:30 1.00 CASING ! P RUNPRD PJSM AND LAY DOWN RUNNING TOOLS -POP OFF,LAY DOWN 2-1/16"CSH 1-NO ADDITIONAL E-LINE SLACK RECOVERED -LAY DOWN LINER RUNNING TOOLS -ALL SHEAR PINS SHEARED PROPERLY -BREAK TOOL,RECOVER 5/8"RELEASE BALL 03 30 - 05:00 1.50 BOPSUR P OTHCMP PJSM AND CHANGE 2-3/8"PIPE RAMS TO 1.315"PIPE RAMS -LEAK TIGHT TEST TREE VALVES -OPEN DOORS AND REMOVE 2-3/8"COMBIS -INSTALL 1.315"COMBIS AND CLOSE DOORS 05:00 - 07:30 2.50 BOPSUR P OTHCMP PJSM AND PRESS TEST BOP -ALL TESTS TO 250/3500 PSI FOR 5/5 CHARTED MIN -SHELL TEST,GOOD TEST TEST 1.315"COMBIS WITH 1.315"TEST JOINT,GOOD TEST -TEST ANNULAR WITH 1.315"TEST JOINT, GOOD TEST 07:30 - 09:00 1.50 BOPSUR P OTHCMP PREPARE RIG FLOOR FOR RUNNING 1-1/4" CSH -CHANGE ELEVATORS -CHANGE DIES ON LITTLE JERKS -VERIFY PIPE COUNT VS PIPE TALLY 09:00 - 13:00 4.00 CLEAN P OTHCMP I MAKE UP 1-3/4"CLEAN OUT ASSEMBLY -HELD PJSM FOR PU&RUNNING 1-1/4"CSH I-MU 1.75 MILL,BAKER MOTOR,CIRC I SUB/DISCO(96)JTS 1-1/4"CSH -GET ONTO WELL WITH INJECTOR PRESSURE TEST QTS 250/3500(PASSED) 13:00 - 16:00 3.00 CLEAN P OTHCMP RIH WITH 1-3/4"CLEANOUT ASSEMBLY -BPM IN/OUT:0.38/0.71 CIRC PSI:432 -MW IN/OUT:8.36 PPG/8.31 PPG -REDUCE SPEED TO 25 FPM THRU 2-3/8" ;LINER -INCREASE CIRC RATE:1.12 BPM -RIH TAG PBTD:11,763'MD(UNCORRECTED) -CONFIRM DEPTH WITH 2ND TAG Printed 7/21/2014 10:30:28AM North America-ALASKA-BP Page 4 of 7 Operation Summary Report Common Well Name:E-36 AFE No Event Type:COM-ONSHORE(CON) Start Date:7/9/2014 End Date:7/12/2014 X3-015DD-C:(1,517,874.00) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.:NORDIC 2 Spud Date/Time:6/12/1995 12:00:00AM Rig Release.7/12/2014 Rig Contractor:NORDIC CALISTA U WI:500292256300 Active datum:ORIG KELLY BUSHING t 64.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 16:00 - 19:00 3.00 CLEAN P OTHCMP I POOH WITH 1-3/4"CLEANOUT ASSEMBLY -BPM IN/OUT:1.12/1.04 CIRC PSI:2205 -MW IN/OUT:8.36 PPG/8.31 PPG FLOW CHECK AT 8800'MD.(NO FLOW) -CONT POOH TO 3200'MD.FLOW CHECK. (NO FLOW) 19:00 - 22:30 3.50 CLEAN P OTHCMP PJSM AND LAY DOWN CLEANOUT BHA -POP OFF,SET INJECTOR ON LEGS. LD 4 JTS 2-1/16"CSH -STAND BACK 96 JTS 1"CSH -LD MOTOR AND MILL 22:30 - 00:00 1.50 EVAL P OTHCMP PJSM AND PICKUP LOGGING BHA PROGRAM LOGGING TOOLS PU LOGGING TOOLS RUN 96 JTS 1"CSH 7/11/2014 00:00 - 02:00 2.00 EVAL P OTHCMP CONTINUE PICK UP LOGGING BHA I-CONTINUE TO RUN 96 JTS 1"CSH •"KICK WHILE RUNNING WORKSTRING DRILL WITH AAR"" -PU 4 JTS 2-1/16"CSH GET ON WELL,PRESS TEST QTS 02:00 - 04:00 2.00 EVAL P OTHCMP RIH WITH LOGGING BHA TO 8790'MD -80'/MIN WITH 0.55/0.86 BPM IN/OUT MW IN/OUT:8.36/8.31 PPG -WAIT AT 8790'MD FOR LOGGING TOOL TO TURN ON AND NEUTRON SOURCE TO INITIATE 04:00 - 05:30 1.50 EVAL P OTHCMP LOG DOWN FROM 8790'MD TO PBTD -30'/MIN WITH 0.56/0.67 BPM -TAG PBTD AT 11,770'MD UNCORRECTED 05:30 - 10:00 4.50 EVAL P OTHCMP LOG UP FROM 11,770'TO 8790'MD -20'/MIN WITH 0.55/0.47 BPM IN/OUT -PAINT FLAG AT 11,604'MD UNCORRECTED -STOP AT 8790'MD NOTIFIED BAKER ATLAS -CONTINUE POOH TO 3200'MD -PERFORM 15 MIN FLOW CHECK(NO FLOW) -STAND BACK INJECTOR 10:00 - 12:30 2.50 EVAL P OTHCMP POOH F/3200'-300'MD -STAND BACK 1"CSH -HELD PJSM FOR HANDLING LOGGING TOOLS -POOH F/300'-0'MD -LD BAKER ATLAS LOGGING TOOLS Printed 7/21/2014 10:30:28AM North America-ALASKA-BP Page 5 of 7 Operation Summary Report Common Well Name:E-36 AFE No Event Type:COM-ONSHORE(CON) Start Date:7/9/2014 End Date:7/12/2014 X3 015DD C:(1,517,874.00) Project:Prudhoe Bay , Site:PB E Pad Rig Name/No.:NORDIC 2 I Spud Date/Time:6/12/1995 12:00:00AM Rig Release:7/12/2014 Rig Contractor:NORDIC CALISTA UWI:500292256300 Active datum:ORIG KELLY BUSHING @64.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations _ (hr) ' (usft) 12:30 - 13:00 0.50 EVAL P OTHCMP PERFORM INJECTIVITY TEST 1-INSTALL NIGHT CAP AND TEST SAME -PRESSURE UP WELLBORE BPM:0.5 CIRC PSI:2140(INITIAL BREAK OVER) 0.9 2450(PRESSURE CONTINUE TO INCREASE) 0.0 2450-1645(PRESSURE BLEED OFF IN 5 MINS) 0.5 2450(PRESSURE j I CONTINUE TO INCREASE) 0.0 2450-1645(PRESSURE BLEED OFF IN 5 MINS) -UNABLE TO GET A STABLE INJECTIVITY !RATE DURING THIS TEST.MADE SEVERAL ATTEMPTS TO HOLD A CONSISTANT INJECTION RATE TO NO AVAIL.HIGHER PRESSURE THAN 2450 NEEDED TO BREAK DOWN THIS FORMATION. _ 13:00 - 15:30 2.50 EVAL P I OTHCMP 1DOVVNLOAD AND PROCESS LOGGING DATA -LOWER BAKER ATLAS TOOLS DOWN I LOGGING UNIT -DOWNLOAD DATAAND CONFIRM GOOD LOGGING RUN PROCESS LOGGING DATA 15.30 - 16:00 0.50 PERF P OTHCMP HELD PJSM WITH SLB TCP -LOAD TCP GUNS AND INSPECT SAME PREPARE RIG FLOOR FOR PERF GUN RUN 1600 - 18:00 2.00 PERF P OTHCMP MAKE UP TCP PERF ASSEMBLY -RIH WITH 1"CSH F/100'-3251'MD -GET ONTO WELL WITH INJECTOR -PRESSURE TEST QTS 250/3500(PASSED) 18:00 - 20:00 2.00 PERF P OTHCMP RIH WITH PERF BHA TO 11,770'MD -80'/MIN WITH 0.55/0.86 BPM IN/OUT -MW IN/OUT:8.36/8.31 PPG -SEE TD FLAG WITH 0'CORRECTION + TAG TD AT 11,769'MD 20:00 - 21:00 1.00 PERF P OTHCMP 'PICK UP TO 11,700'MD PERFORM PERFORATING SEQUENCE AND FIRE WHILE PU SLOW POSITIVE INDICATION OF FIRE SMALL INITIAL LOSS(<1 BBL) 21:00 - 22:00 1.00 PERF P OTHCMP POOH WITH PERF GUNS TO TOL -40'/MIN WITH 0.62/0.42 BPM IN/OUT -HOLD 250 PSI BACK PRESSURE MW IN/OUT:8.40/8.30 PPG FLOW CHECK AT 8700'MD,NO FLOW 22.00 - 22:30 0.50 PERF P OTHCMP RIG EVAC DRILL WITH AAR*** -SIMULATE MAN DOWN WITH CTS SUPERVISOR TO MONITOR WELL ;-TIMELY RESPONSE FROM RIG CREW, l TRUCK DRIVER,TCP PERSONNEL -DISCUSS SIGN IN/OUT CRITERIA FOR LOCATION CONTROL _ 22:30 - 00:00 1.50 PERF P OTHCMP POOH WITH PERF GUNS -100'/MIN WITH 0.96/0.56 BPM IN/OUT -MW IN/OUT:8.44/8.30 PPG -FLOW CHECK ON SURFACE,NO FLOW 7/12/2014 00:00 - 02:30 2.50 PERF P OTHCMP PJSM AND LAY DOWN PERF BHA -LAY DOWN 4 JTS 2-1/16"CSH 1-LAY DOWN 96 JTS 1"CSH Printed 7/21/2014 10:30:28AM North America-ALASKA-BP Page 6 of 7 Operation Summary Report Common Well Name:E-36 AFE No Event Type:COM-ONSHORE(CON) Start Date:7/9/2014 End Date:7/12/2014 X3-015DD-C:(1,517,874.00) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.:NORDIC 2 Spud Date/Time:6/12/1995 12:00:00AM Rig Release:7/12/2014 Rig Contractor:NORDIC CALISTA UWI:500292256300 Active datum:ORIG KELLY BUSHING©64.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:30 - 03:30 1.00 PERF P OTHCMP PJSM AND LAY DOWN PERF GUNS ALL SHOTS FIRED -CLEAN AND CLEAR RIG FLOOR 03:30 - 04:30 1.00 WHSUR P POST PJSM AND PU FREEZE PROTECT BHA -PU NOZZLE,2 STINGERS,DUAL BPV ASSEMBLY GET ON WELL,PRESS TEST QTS PERFORM VAPOR PRESSURE TEST ON DEAD CRUDE AS PER SLB PROCEDURE 04:30 - 06:00 1.50 WHSUR P POST i RIH TO 2500'MD 100'/MIN WITH 1.45/1.80 BPM IN/OUT ;POOH FROM 2500'MD LAYING IN FREEZE PROTECT -60'/MIN WITH 1.00/0.75 BPM IN/OUT !-FLOW CHECK ON SURFACE,NO FLOW -CLOSE MASTER VALVE AND DISPLACE CRUDE FROM TREE WITH FRESH WATER, OPEN MASTER VALVE 06:00 - 06:30 0.50 WHSUR P i POST PJSM AND LAY DOWN NOZZLE -POP OFF,STAND BACK INJECTOR _ LAY DOWN NOZZLE ASSEMBLY 06:30 - 07:30 1.00 WHSUR P j POST j PJSM,GREASE TREE VALVES,AND DRY ROD IN TWC 07:30 - 09:00 1.50 WHSUR P t i POST 'PREPARE FOR REEL BLOW DOWN WITH SLB N2 -SPOT VEHICLES NEXT TO REEL HOUSE -HELD PJSM FOR RU SLB N2 UNIT -RU SLB N2 UNIT AND PRESSURE TEST LINES -VERIFY LINE-UP PRIOR TO REEL BLOW DOWN W/PRESSURE CROSSCHECK SHEET -BLOW DOWN REEL AS PER PROCEDURES -BLEED OFF UNIT/RIG DOWN 09:00 - 09:30 0.50 BOPSUR P POST I PREPARE TO RU COIL GRAPPLE HELD PJSM FOR RU COIL GRAPPLE -GET OFF WELL WITH INJECTOR 09:30 - 11:30 2.00 BOPSUR P POST INSTALL COIL GRAPPLE -CUT-OFF COIL CONNECTOR -PREP CUT OFF TO RECEIVE GRAPPLE -INSTALL GRAPPLE/HOLD PJSM FOR PULL ACROSS 11:30 - 13:00 1.50 BOPSUR P POST PULL COIL ACROSS SECURE ONTO REEL -HELD PJSM FOR PULLING COIL ACROSS -PULL COIL ACROSS TO REEL AND SECURE WITH SHIPPING BAR. -CUT OFF TAIL 13:00 - 14:30 1.50 BOPSUR P POST RIG DOWN INJECTOR -HELD PJSM FOR RIGGING DOWN INJECTOR -REMOVE LUBRICATOR AND PACK OFF SET INJECTOR ON RIG FLOOR -REMOVE BRASS FROM INJECTOR 14:30 - 18:30 4.00 BOPSUR ' P POST INSPECT BOP RAMS -LEAK TIGHT TEST FOR BREAKING CONTAINMENT -OPEN UP AND INSPECT BOP RAMS RD IRON FROM CTD REEL _ -CLEAN PITS 18:30 - 20:30 2.00 BOPSUR P POST PJSM,ND BOPE AND SECURE IN CELLAR FOR RIG MOVE Printed 7/21/2014 10:30:28AM North America-ALASKA-BP Page 7 of 7 Operation Summary Report Common Well Name:E-36 AFE No Event Type:COM-ONSHORE(CON) Start Date:7/9/2014 I End Date:7/12/2014 X3-015DD-C:(1,517,874.00) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.:NORDIC 2 Spud Date/Time:6/12/1995 12:00:00AM Rig Release:7/12/2014 Rig Contractor:NORDIC CALISTA 1 UWI:500292256300 Active datum:ORIG KELLY BUSHING @64.10usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) - — f 1.50 BOPSUR P 20.30 22:00 POST FREEZE PROTECT TREE WITH MEOH NU TREE CAP AND PRESS TEST TO 250/3500 PSI FOR 5/5 MIN RELEASE NORDIC 2 CTD RIG AND END COMPLETION EVENT AT 22:00 ON 07/12/2014. I PREP RIG TO MOVE TO NEXT WELL H-35A. I ALL TREE AND WELLHEAD VALVE LEFT CLOSED WITH PRESSURE GAUGES. FINAL OA/IA PRESS=0/0 PSI. TREE,WELLHEAD,AND CELLAR CLEAN. WELLWORKTRANSFER PERMIT CLOSED WITH PAD OPERATOR. WELL HANDOVER COMPLETED WITH MPU j WELLS GROUP. Printed 7/21/2014 10 30:28AM E-36B, Well History (Post-Rig Sidetrack) Date Summary 07/21/14 DRIFTED W/ 1.71"TEL(no finger), 1-1/2" S-BAILER TO 9050'SLM (no restrictions). 07/22/14 RAN PDS 24 ARM CALIPER LOG FROM 9000'SLM TO 8700' SLM (2 passes, good data) DRIFT W/DMY 45KB DMY LTP DRIFT, S/D IN DEP SLV @ 8816'SLM/8844' MD (TT pins sheared) SET BAKER 45KB LTP W/CMD SSD IN DEP SLV @ 8823'SLM/8844' and W/HES DPU ***TOP OF LTP IS @ 8831' MD*** RAN PDS 24 ARM CALIPER LOG FROM 9000' SLM TO 8650'SLM (2 passes, no data). RE-RAN PDS 24 ARM CALIPER LOG FROM 9000'SLM TO 8650' SLM (2 passes, good data). 07/23/14 RAN 2-7/8" B-SHIFTING TOOL TO CMD SSD IN 45KB LTP @ 8820' SLM (sliding sleeve closed) SET 4-1/2"WHIDDON CATCHER @ 8792' SLM. PULLED STA#1 BK-DGLV FROM 6232'SLM/6235' MD&STA#2 BK-DGLV FROM 4802' SLM/4830' MD. SET STA#1 BK-LGLV&STA#2 BK-OGLV. PULLED WHIDDON CATCHER SUB FROM 8792'SLM (empty). Page 1 of 1 bp North America - ALASKA - BP Prudhoe Bay PB E Pad E-36 500292256300 E-36B Design: E-36B Survey Report - Geographic 15 July, 2014 BAKER HUGHES 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 64.10usft(NORDIC 1) Site: PB E Pad MD Reference: ORIG KELLY BUSHING @ 64.10usft(NORDIC 1) Well: E-36 North Reference: True Wellbore: E-36B Survey Calculation Method: Minimum Curvature Design: E-36B Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB E Pad,TR-11-14 Site Position: Northing: 5,973,160.88 usft Latitude: 70°19'59.134 N From: Map Easting: 662,538.97 usft Longitude: 148°40'53.05 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.24 ° Well E-36 API No. 500292256300 Well Position +NI-S 0.00 usft Northing: 5,975,350.05 usft Latitude: 70°20'20.326 N +EI-W 0.00 usft Easting: 664,102.28 usft Longitude: 148°40'6.01 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 28.90 usft Wellbore E-36B API no. 500292256302 Magnetics Model Name Sample Date Declination Dip Angle Field Strength 11 (°► (nT) BGGM2013 7/8/2014 19.73 81.03 57,631 Design E-36B Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,506.00 Vertical Section: Depth From(TVD) +N/-S +EI-W Direction (usft) (usft) (usft) (0) 34.10 0.00 0.00 170.00 Survey Program Date: 7/15/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 151.60 9,223.90 1 :MWD-Standard(E-36) MWD MWD-Standard 9,223.90 9,506.00 MWD(E-36A) MWD MWD-Standard 9,522.00 9,558.64 INC+TREND(E-36B) INC+TREND Inclinometer+known azi trend 9,589.61 11,771.00 MWD(E-36B) MWD MWD-Standard 7/15/2014 2.22:54PM Page 2 COMPASS 5000.1 Build 61 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 64.10usft(NORDIC 1) Site: PB E Pad MD Reference: ORIG KELLY BUSHING @ 64.10usft(NORDIC 1) Well: E-36 North Reference: True Wellbore: E-36B Survey Calculation Method: Minimum Curvature Design: E-36B Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,506.00 71.69 282.67 8,935.36 1,700.40 -1,322.29 5,977,020.99 662,743.19 70°20'37.048 N 148°40'44.64 W TIP 9,522.00 71.96 279.12 8,940.36 1,703.27 -1,337.21 5,977,023.53 662,728.21 70°20'37.076 N 148°40'45.08 W KOP 9,558.64 66.45 270.69 8,953.38 1,706.25 -1,371.28 5,977,025.76 662,694.08 70°20'37.105 N 148°40'46.08 W Interpolated Azimuth 9,589.61 65.41 263.30 8,966.02 1,704.77 -1,399.49 5,977,023.67 662,665.91 70°20'37.091 N 148°40'46.90 W First Clean Survey 9,621.62 63.58 254.02 8,979.83 1,699.12 -1,427.78 5,977,017.40 662,637.76 70°20'37.035 N 148°40'47.73 W 9,649.39 63.92 243.69 8,992.14 1,690.15 -1,450.97 5,977,007.92 662,614.77 70°20'36.947 N 148°40'48.40 W 9,679.44 63.58 234.24 9,005.46 1,676.28 -1,474.02 5,976,993.55 662,592.03 70°20'36.810 N 148°40'49.08 W 9,709.44 64.39 226.75 9,018.63 1,659.14 -1,494.80 5,976,975.96 662,571.63 70°20'36.642 N 148°40'49.68 W 9,739.60 64.33 214.41 9,031.72 1,638.54 -1,512.44 5,976,954.99 662,554.45 70°20'36.439 N 148°40'50.20 W 9,770.72 66.64 203.45 9,044.67 1,613.80 -1,526.09 5,976,929.96 662,541.35 70°20'36.196 N 148°40'50.60 W 9,799.50 69.29 194.94 9,055.48 1,588.63 -1,534.83 5,976,904.60 662,533.16 70°20'35.948 N 148°40'50.85 W 9,830.37 76.46 186.50 9,064.58 1,559.69 -1,540.27 5,976,875.55 662,528.36 70°20'35.664 N 148°40'51.01 W 9,860.20 78.72 180.85 9,070.99 1,530.63 -1,542.13 5,976,846.46 662,527.13 70°20'35.378 N 148°40'51.07 W 9,891.38 79.03 180.04 9,077.01 1,500.04 -1,542.37 5,976,815.87 662,527.56 70°20'35.077 N 148°40'51.07 W 9,920.41 81.29 175.66 9,081.97 1,471.46 -1,541.29 5,976,787.33 662,529.27 70°20'34.796 N 148°40'51.04 W 9,950.29 84,99 174.05 9,085.54 1,441.92 -1,538.63 5,976,757.86 662,532.57 70°20'34.505 N 148°40'50.96 W 9,980.28 88.01 172.36 9,087.37 1,412.20 -1,535.09 5,976,728.22 662,536.76 70°20'34.213 N 148°40'50.86 W 10,010.28 90.61 170.35 9,087.73 1,382.55 -1,530.58 5,976,698.68 662,541.92 70°20'33.921 N 148°40'50.73 W 10,040.33 94.12 170.04 9,086.49 1,352.97 -1,525.46 5,976,669.22 662,547.68 70°20'33.631 N 148°40'50.58 W 10,070.38 95.44 169.71 9,083.99 1,323.49 -1,520.20 5,976,639.86 662,553.58 70°20'33.341 N 148°40'50.42 W 10,100.30 94.85 165.65 9,081.31 1,294.38 -1,513.84 5,976,610.90 662,560.58 70°20'33.054 N 148°40'50.24 W 10,130.24 95.07 161.54 9,078.72 1,265.78 -1,505.42 5,976,582.49 662,569.62 70°20'32.773 N 148°40'49.99 W 10,163.04 95.65 158.63 9,075.65 1,235.08 -1,494.30 5,976,552.04 662,581.41 70°20'32.471 N 148°40'49.67 W 10,191.14 94.76 154.25 9,073.10 1,209.43 -1,483.12 5,976,526.65 662,593.15 70°20'32.219 N 148°40'49.34 W 10,220.12 96.00 151.03 9,070.38 1,183.81 -1,469.86 5,976,501.33 662,606.97 70°20'31.967 N 148°40'48.95 W 10,250.00 94.05 149.50 9,067.77 1,157.97 -1,455.10 5,976,475.82 662,622.29 70°20'31.713 N 148°40'48.52 W 10,280.17 92.76 147.72 9,065.97 1,132.26 -1,439.41 5,976,450.46 662,638.54 70°20'31.460 N 148°40'48.06 W 10,310.54 90.58 146.39 9,065.09 1,106.79 -1,422.90 5,976,425.36 662,655.60 70°20'31.210 N 148°40'47.58 W 10,340.12 88.10 143.33 9,065.43 1,082.60 -1,405.88 5,976,401.55 662,673.14 70°20'30.972 N 148°40'47.08 W 10,370.12 89.02 140.61 9,066.18 1,058.98 -1,387.41 5,976,378.34 662,692.13 70°20'30.739 N 148°40'46.54 W 10,400.15 89.48 138.19 9,066.58 1,036.19 -1,367.87 5,976,355.98 662,712.16 70°20'30.515 N 148°40'45.97 W 10,430.14 88.99 143.27 9,066.98 1,012.98 -1,348.89 5,976,333.20 662,731.64 70°20'30.287 N 148°40'45.42 W 10,460.28 89.60 147.62 9,067.35 988.16 -1,331.80 5,976,308.76 662,749.26 70°20'30.043 N 148°40'44.92 W 10,490.15 90.98 149.54 9,067.20 962.68 -1,316.23 5,976,283.62 662,765.39 70°20'29.792 N 148°40'44.46 W 10,520.15 91.72 154.52 9,066.49 936.20 -1,302.17 5,976,257.46 662,780.02 70°20'29.532 N 148°40'44.05 W 10,550.43 90.28 158.13 9,065.96 908.47 -1,290.02 5,976,230.01 662,792.78 70°20'29.259 N 148°40'43.70 W 10,580.45 90.74 160.10 9,065.69 880.43 -1,279.31 5,976,202.21 662,804.09 70°20'28.984 N 148°40'43.39 W 10,610.52 89.91 163.92 9,065.52 851.83 -1,270.03 5,976,173.83 662,814.00 70°20'28.702 N 148°40'43.11 W 10,640.48 89.91 166.96 9,065.57 822.84 -1,262.50 5,976,145.01 662,822.16 70°20'28.417 N 148°40'42.89 W 10,671.62 90.21 170.89 9,065.54 792.29 -1,256.52 5,976,114.59 662,828.81 70°20'28.117 N 148°40'42.72 W 10,700.52 89.69 174.42 9,065.56 763.63 -1,252.82 5,976,086.03 662,833.13 70°20'27.835 N 148°40'42.61 W 10,730.55 89.88 177.93 9,065.68 733.67 -1,250.82 5,976,056.12 662,835.79 70°20'27.540 N 148°40'42.55 W 10,760.46 91.48 181.79 9,065.32 703.77 -1,250.75 5,976,026.23 662,836.52 70°20'27.246 N 148°40'42.55 W 10,790.44 92.64 184.34 9,064.24 673.85 -1,252.35 5,975,996.29 662,835.57 70°20'26.952 N 148°40'42.60 W 10,820.35 89.42 182.93 9,063.71 644.01 -1,254.24 5,975,966.42 662,834.33 70°20'26.658 N 148°40'42.65 W 10,850.11 91.23 178.13 9,063.54 614.27 -1,254.52 5,975,936.67 662,834.70 70°20'26.366 N 148°40'42.66 W 10,880.18 88.49 174.66 9,063.61 584.26 -1,252.63 5,975,906.72 662,837.25 70°20'26.071 N 148°40'42.60 W 10,910.38 89.66 173.08 9,064.10 554.24 -1,249.41 5,975,876.78 662,841.13 70°20'25.776 N 148°40'42.51 W 10,940.24 89.66 171.90 9,064.27 524.64 -1,245.50 5,975,847.27 662,845.68 70°20'25.484 N 148°40'42.40 W 10,970.32 89.82 170.82 9,064.41 494.90 -1,240.98 5,975,817.64 662,850.85 70°20'25.192 N 148°40'42.26 W 11,000.35 89.36 169.16 9,064.63 465.33 -1,235.76 5,975,788.19 662,856.71 70°20'24.901 N 148°40'42.11 W 7/15/2014 2:22:54PM Page 3 COMPASS 5000.1 Build 61 I PIr 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 64.10usft(NORDIC 1) Site: PB E Pad MD Reference: ORIG KELLY BUSHING @ 64.10usft(NORDIC 1) Well: E-36 North Reference: True Wellbore: E-36B Survey Calculation Method: Minimum Curvature Design: E-36B Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (0) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 11,030.37 89.02 167.40 9,065.05 435.94 -1,229.67 5,975,758.94 662,863.45 70°20'24.612 N 148°40'41.93 W 11,060.28 88.56 164.86 9,065.68 406.91 -1,222.50 5,975,730.08 662,871.25 70°20'24.327 N 148°40'41.72 W 11,090.51 89.63 163.59 9,066.16 377.82 -1,214.28 5,975,701.18 662,880.10 70°20'24.041 N 148°40'41.48 W 11,130.73 87.97 161.24 9,067.00 339.49 -1,202.14 5,975,663.13 662,893.09 70°20'23.664 N 148°40'41.13 W 11,161.61 89.14 160.00 9,067.78 310.38 -1,191.89 5,975,634.25 662,903.96 70°20'23.377 N 148°40'40.83 W 11,190.29 89.20 157.92 9,068.20 283.61 -1,181.60 5,975,607.72 662,914.84 70°20'23.114 N 148°40'40.53 W 11,228.33 87.54 157.85 9,069.28 248.39 -1,167.28 5,975,572.81 662,929.92 70°20'22.768 N 148°40'40.11 W 11,258.35 85.55 156.06 9,071.09 220.81 -1,155.55 5,975,545.51 662,942.25 70°20'22.497 N 148°40'39.77 W 11,289.87 84.41 153.89 9,073.85 192.36 -1,142.27 5,975,517.36 662,956.15 70°20'22.217 N 148°40'39.38 W 11,321.01 85.85 151.55 9,076.49 164.79 -1,128.05 5,975,490.10 662,970.97 70°20'21.946 N 148°40'38.96 W 11,353.76 84.90 149.06 9,079.13 136.44 -1,111.88 5,975,462.11 662,987.75 70°20'21.667 N 148°40'38.49 W 11,380.28 84.46 146.81 9,081.59 114.06 -1,097.87 5,975,440.05 663,002.26 70°20'21.447 N 148°40'38.08 W 11,410.28 84.41 143.95 9,084.50 89.49 -1,080.91 5,975,415.86 663,019.75 70°20'21.205 N 148°40'37.59 W 11,440.45 84.25 140.70 9,087.48 65.73 -1,062.56 5,975,392.51 663,038.61 70°20'20.971 N 148°40'37.05 W 11,470.46 83.80 138.17 9,090.61 43.06 -1,043.15 5,975,370.27 663,058.51 70°20'20.748 N 148°40'36.48 W 11,502.15 82.96 136.24 9,094.26 19.96 -1,021.77 5,975,347.65 663,080.39 70°20'20.521 N 148°40'35.86 W 11,530.27 81.81 132.34 9,097.99 0.50 -1,001.82 5,975,328.63 663,100.76 70°20'20.330 N 148°40'35.28 W 11,560.38 81.53 129.54 9,102.35 -19.02 -979.32 5,975,309.61 663,123.68 70°20'20.138 N 148°40'34.62 W 11,590.19 82.28 126.52 9,106.55 -37.20 -956.07 5,975,291.94 663,147.32 70°20'19.959 N 148°40'33.94 W 11,620.18 82.09 123.96 9,110.63 -54.34 -931.81 5,975,275.34 663,171.95 70°20'19.791 N 148°40'33.23 W 11,650.12 84.99 121.96 9,114.00 -70.52 -906.85 5,975,259.71 663,197.25 70°20'19.632 N 148°40'32.50 W 11,680.40 80.26 117.66 9,117.88 -85.45 -880.81 5,975,245.35 663,223.61 70°20'19.485 N 148°40'31.74 W 11,710.24 78.61 112.04 9,123.36 -97.77 -854.21 5,975,233.61 663,250.48 70°20'19.364 N 148°40'30.96 W 11,740.24 77.39 108.73 9,129.60 -107.99 -826.71 5,975,224.00 663,278.19 70°20'19.263 N 148°40'30.16 W 11,771.00 77.16 107.86 9,136.37 -117.41 -798.22 5,975,215.21 663,306.88 70°20'19.171 N 148°40'29.33 W 11,808.00 77.16 107.86 9,144.60 -128.48 -763.88 5,975,204.90 663,341.45 70°20'19.062 N 148°40'28.33 W Projected To TD-Projection to TD 7/15/2014 2:22:54PM Page 4 COMPASS 5000.1 Build 61 /G" 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36 Project: Prudhoe Bay ND Reference: ORIG KELLY BUSHING @ 64.10usft(NORDIC 1) Site: PB E Pad MD Reference: ORIG KELLY BUSHING @ 64.10usft(NORDIC 1) Well: E-36 North Reference: True Wellbore: E-36B Survey Calculation Method: Minimum Curvature Design: E-36B Database: EDM R5K-Alaska PROD-ANCP1 Targets Target Name -hit/miss target Dip Angle Dip Dir. ND +N/-S +EI-W Northing Easting -Shape (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude E-36B Target 1 0.00 0.00 9,074.10 1,503.92 -1,576.85 5,976,819.00 662,493.00 70°20'35.115 N 148°40'52.08 W -actual wellpath misses target center by 34.56usft at 9887.27usft MD(9076.23 TVD,1504.07 N,-1542.36 E) -Point E-36B Target 4.1 0.00 0.00 9,069.10 295.15 -1,147.18 5,975,620.00 662,949.00 70°20'23.228 N 148°40'39.52 W -actual wellpath misses target center by 36.24usft at 11192.59usft MD(9068.23 TVD,281.48 N,-1180.73 E) -Point E-36B Polygon 0.00 0.00 64.10 1,430.06 -1,812.54 5,976,740.00 662,259.00 70°20'34.388 N 148°40'58.97 W -actual wellpath misses target center by 8888.91 usft at 9506.00usft MD(8935.36 TVD,1700.40 N,-1322.29 E) -Polygon Point 1 64.10 -48.84 -8.07 5,976,691.00 662,252.00 Point 2 64.10 -36.50 479.35 5,976,714.00 662,739.00 Point3 64.10 -1,926.64 1,601.33 5,974,849.00 663,902.00 Point 4 64.10 -2,160.92 1,291.11 5,974,608.00 663,597.00 Point 5 64.10 -1,346.69 560.70 5,975,406.00 662,849.00 E-36B Fault 2 0.00 0.00 64.10 777.07 -1,913.87 5,976,085.00 662,172.00 70°20'27.966 N 148°41'1.92 W -actual wellpath misses target center by 8938.78usft at 9506.Oousft MD(8935.36 TVD,1700.40 N,-1322.29 E) -Polygon Point 1 64.10 0.00 0.00 5,976,085.00 662,172.00 Point 2 64.10 182.19 725.21 5,976,283.00 662,893.00 E-36B Target 2 0.00 0.00 9,064.10 1,272.55 -1,608.93 5,976,587.00 662,466.00 70°20'32.839 N 148°40'53.02 W -actual wellpath misses target center by 99.06usft at 10100.30usft MD(9081.31 TVD,1294.38 N,-1513.84 E) -Point E-36B Target 3 0.00 0.00 9,069.10 590.29 -1,286.76 5,975,912.00 662,803.00 70°20'26.130 N 148°40'43.60 W -actual wellpath misses target center by 33.98usft at 10872.03usft MD(9063.45 TVD,592.38 N,-1253.32 E) -Point E-36B Fault 5 0.00 0.00 64.10 -447.97 -969.38 5,974,881.00 663,143.00 70°20'15.919 N 148°40'34.33 W -actual wellpath misses target center by 9033.70usft at 11258.35usft MD(9071.09 TVD,220.81 N,-1155.55 E) -Polygon Point 1 64.10 0.00 0.00 5,974,881.00 663,143.00 Point 2 64.10 262.41 167.79 5,975,147.00 663,305.00 E-36B Target 4 0.00 0.00 9,069.10 295.15 -1,147.18 5,975,620.00 662,949.00 70°20'23.228 N 148°40'39.52 W -actual wellpath misses target center by 36.24usft at 11192.59usft MD(9068.23 TVD,281.48 N,-1180.73 E) -Point E-36B Fault 4 0.00 0.00 64.10 159.96 -912.06 5,975,490.00 663,187.00 70°20'21.898 N 148°40'32.65 W -actual wellpath misses target center by 9008.98usft at 11190.29usft MD(9068.20 TVD,283.61 N,-1181.60 E) -Polygon Point 1 64.10 0.00 0.00 5,975,490.00 663,187.00 Point 2 64.10 171.00 504.90 5,975,672.00 663,688.00 E-36B Target 2.1 0.00 0.00 9,064.10 1,272.55 -1,608.93 5,976,587.00 662,466.00 70°20'32.839 N 148°40'53.02 W -actual welipath misses target center by 99.06usft at 10100.30usft MD(9081.31 TVD,1294.38 N,-1513.84 E) -Point E-36B Fault 3 0.00 0.00 64.10 130.20 -1,471.89 5,975,448.00 662,628.00 70°20'21.605 N 148°40'49.01 W -actual wellpath misses target center by 9009.15usft at 11090.51 usft MD(9066.16 TVD,377.82 N,-1214.28 E) -Polygon Point 1 64.10 0.00 0.00 5,975,448.00 662,628.00 Point 2 64.10 89.72 197.02 5,975,542.00 662,823.00 E-36B Target 5 0.00 0.00 9,214.10 -298.82 -700.04 5,975,036.00 663,409.00 70°20'17.386 N 148°40'26.46 W -actual wellpath misses target center by 194.74usft at 11808.00usft MD(9144.60 TVD,-128.48 N,-763.88 E) -Point E-36B Target 1.1 0.00 0.00 9,074.10 1,503.92 -1,576.85 5,976,819.00 662,493.00 70°20'35.115 N 148°40'52.08 W -actual wellpath misses target center by 34.56usft at 9887.27usft MD(9076.23 TVD,1504.07 N,-1542.36 E) -Point E-36B Fault 6 0.00 0.00 64.10 -140.38 -489.50 5,975,199.00 663,616.00 70°20'18.945 N 148°40'20.31 W 7/15/2014 2:22:54PM Page 5 COMPASS 5000.1 Build 61 ��� 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36 Project: Prudhoe Bay TVD Reference: ORIG KELLY BUSHING @ 64.10usft(NORDIC 1) Site: PB E Pad MD Reference: ORIG KELLY BUSHING @ 64.10usft(NORDIC 1) Well: E-36 North Reference: True Wellbore: E-36B Survey Calculation Method: Minimum Curvature Design: E-36B Database: EDM R5K-Alaska PROD-ANCP1 -actual wellpath misses target center by 9038.80usft at 11258.35usft MD(9071.09 TVD,220.81 N,-1155.55 E) -Polygon Point 1 64.10 0.00 0.00 5,975,199.00 663,616.00 Point 2 64.10 68.85 327.61 5,975,275.00 663,942.00 E-36B Target 3.1 0.00 0.00 9,069.10 590.29 -1,286.76 5,975,912.00 662,803.00 70°20'26.130 N 148°40'43.60 W -actual wellpath misses target center by 33.98usft at 10872.03usft MD(9063.45 TVD,592.38 N,-1253.32 E) -Point E-36B Target 6.1 0.00 0.00 9,149.10 -56.71 -838.78 5,975,275.00 663,265.00 70°20'19.767 N 148°40'30.51 W -actual wellpath misses target center by 50.69usft at 11715.75usft MD(9124.46 TVD,-99.77 N,-849.19 E) -Point E-36B Fault 1 0.00 0.00 64.10 834.23 -2,011.64 5,976,140.00 662,073.00 70°20'28.528 N 148°41'4.78 W -actual wellpath misses target center by 8940.07usft at 9506.00usft MD(8935.36 TVD,1700.40 N,-1322.29 E) -Polygon Point 1 64.10 0.00 0.00 5,976,140.00 662,073.00 Point 2 64.10 216.86 832.00 5,976,375.00 662,900.00 E-36B Target 7.1 0.00 0.00 9,214.10 -256.49 -623.09 5,975,080.00 663,485.00 70°20'17.803 N 148°40'24.21 W -actual wellpath misses target center by 202.59usft at 11808.00usft MD(9144.60 TVD,-128.48 N,-763.88 E) -Point E-36B Target 5.1 0.00 0.00 9,087.51 102.48 -1,014.95 5,975,430.28 663,085.40 70°20'21.333 N 148°40'35.66 W -actual wellpath misses target center by 60.12usft at 11443.48usft MD(9087.79 TVD,63.40 N,-1060.64 E) -Point Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 11,808.00 9,144.60 PRODUCTION LINER 1 2.375 3.250 Design Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (usft) (usft) (usft) (usft) Comment 9,506.00 8,935.36 1,700.40 -1,322.29 TIP 9,522.00 8,940.36 1,703.27 -1,337.21 KOP 9,558.64 8,953.38 1,706.25 -1,371.28 Interpolated Azimuth 9,589.61 8,966.02 1,704.77 -1,399.49 First Clean Survey 11,808.00 9,144.60 -128.48 -763.88 Projected To TD 11,808.00 9,144.60 -128.48 -763.88 Projection to TD Checked By: Approved By: Date: 7/15/2014 2.22:54PM Page 6 COMPASS 5000.1 Build 61 • N o O L N O 0 j O) co a LU 6 c u) N °. v 0 v 7 0- 0. CC I 0 C E E N W O O U H O O) • w (� O O 7 C p '9--- O Q ..a- 0 2 (7 O (0 < Lf) CO H Z H 0 o O D O N C 10 < W C)) r co c i a) m ❑ W U U L 0 J J > NNa) W 0 y Liu) > JU) N ._Na ai O m co 2n No m O 0 o O o 0 J o_ a . u o O0 J O .O O O O O O O o a N O N- > 2 O a) 5 N uU 0 ,- 0 0 W o W y O O N6 O X a3 T V ca • CO E o m L2 2 O co O N O a1 73 2 N V) E E 7.7., p C a ) x o x E-c (NJ C () N j= CO N ❑ 2 ❑ W o O 0) E U C p N .. ❑ O O N r ❑ Z u) ai H a in a o W o E ❑ `. a) o_ W co 2 c o o a cn-Q x @ H �° } o a) '0 w o a a a,Er C 0) a CO .-- m m LL ) �U) Ecoa U d a L o0 E a iEU J0 tii a> "" `D > H J H N N v d o oV o CI) oa �°' N o ai N F-1. 2 E = O N y O_ S3 N o 13- N O 0CL ❑ a o o J 3 O a1 7 C - <n O L U) Ci) W• a o 0 C - oa vi m a m Q re d C o u7 m 3 y 0 0 yU o -a) E Q C Ud o c--' N Q n - o w w in a i F U ~ v m 75 U r Z L 7 co _� L _7 O .c.-. ) o u) d 117 a E ' Q w E m d a ❑ LL E o �. ^ o _E - .N t d N J .- a N ^ Q a N O. O V O w a a rn = LT_ n�. Z O Y r h o Nz. -O m o To o) n O Z -3(n S _O d o 0ai c0 -0 o ma• O a 0 n 00 �' V O 2L w ai 0 La — Oo l. U) 0) ) m m E -0 E c a ❑ Z a) a) .0 LL ✓ > U in N 0 U cn fn a Q O csi V1 C N On O a o c C H H � � _ Z LL1W w > >: ' o Col Q w N N c N Q O Y co o H o 0 2 Z V co a o II U < j= O O o 43 6 O 0 m ❑ Q 3 a)i Q S. 0 w a w a 2 w a I 0 z H o Z Z Y o 6 H Z W a7 o m Z W (] W YV^1 D O 0 0 a) 1 OU W U 0O H Tr a d 7 Z Q O W O CC H m o O 0 O J O c0 0 �_ w a Z - LU U Oa. Y o U) 0 v LI, m U Z rC m Z E x a rn o >. Z f6 W co W Z .v E LL N E O m 0 O o E r a, W H � ' z 2 a o . in E U m o O O m CD '0 U Z N co a) 0) N c a a 0 o U > F 6 E a 2 0 m E d O 0 N N (n u H 'n a c c o m o 2 Ha N 7 0 T o C) Y v C d +--, .. z, d a) - o. o m H N- L0 N- N v o 2 > o .0 E E a) 77 'V :2 a' D_ -o U N - to R u7 O CO n C 0 a w 0 7 ° U U a ct ix tL in 's > in O 2 C7 0 0 a 0 o H • 0 N 0 O O = 3 a) E 0O a) j 01 O = N C W Q L a) O) Q m CIS a m 0 O O I0 J a N H "O L = N gO O Ht Ec'n m7 - z z •a U C9 CC al u0') aa u' a) J L U d a H o 0 ',, o m 12 H o) v (.7 -iii w i H H N CON > I- H _� a) 0 Z N m a) ci FO N 0U) FE .. 0. d z o a) a j a H C O O a K En m r 0 z u' a c 00. 3 W O (h J N a 0- CA CO N CC CO < X t/) 0 rn 0 m N > m• E a) E m a, a rn o E -� Z Z V as C p) p) o in • -a am v a a v O N as o = } z a N Z rn N H N LL a C N n 2 0o O 2 a r N > w o. 8 r a Sm Q? N m 3 n ni .. a ) t O� o m a m o m c 0 o rn S 4) cn E - Q ai c p 'a) Q y w o o a a was a N m m 12 2 m _J ce S ? E > as N H o c a) Ct QCS) Ud m co a a, cnn 9 O > .>_ a 2 -6 amici o U s en E oa 'm rn E c c E V C E to EO =1 } C U O ~ J d Z F U O , U O) a) O � Z5 a) (n O a E x yr) H - c 8 o m Q m m a _ N a) O O a m E 3 c L N J @ a) o O O -, a) o V O _1 a m O O I H -, a I O i _ z z 5 Y H a o CC O En ocsi Z Et o m p = o O • N a R z E O a o_ N a• v 1:7, x W -6 f) IT;= -3 a (n ~0a 0 'IL' co E F °- az ', a O Z > 0 a o 0 O ai 0 o°) v 6 M HOS o t O (n a Q O▪ •a) a m 2' j' c� to O 0 0 I) 2 c (n J O N E o0 a C N O O O 0 N o •f O m m N ONi X a' O_ .. 0 N 3 as H O a) 7 Z, a N v L H O x w o O C u) 0 0 • Clo o) a E H. Ern N a s az m O 2 .14 W v a M a) N c a, E a L C N • E z >a v 0 O U > z a Z Z O -p w O w H a)W C ccs aa)) co O O HT Z O) 0 t_ 0 7 'M ,-7,-.1 2W D- c LCA N e w?� w 0 NZ O w o ce c O N U wai T O U a v) O a J a)mx re mas a) 2 m Cla z o O ZNu)L 5 O)- 'O 2 . _ C Q . rnN a H n n w a pa0 LN _ ao , 0 H 2LL a) d O ,- cE u m ' Z a 0 Oo E 'O j O Lu Ea) a Cr_ aW U 0 mCOWONO nC NO aW C) 7 f U H F U O D CO O m H 2 ..W �V \\V/7, HE STA E J-Le;'Ire. C., f' ,7----f=1-_-_ -.*:.,,-= ____,�__ 333 V�it,sf Scvenih P,vcnuE. L Go\'1,I:\OR SEAN PAItYEI-I- Anchor3age, Alaska 99501-3573 fJ/,o,n 907 27Y 143' �1 � � p� John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU E-36B BP Exploration(Alaska), Inc. Permit No: 214-059 Surface Location: 1706' FNL, 882' FEL, SEC. 06, T11N, R14E, UM Bottomhole Location: 1975' FNL, 1457' FEL, SEC. 06, T11N, R14E, UM , Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, i9.4124_,, Cathy P Foerster Chair Si— DATED this I day of May, 2014. STATE OF ALASKA RECEIVED ALA, )IL AND GAS CONSERVATION COM. V PERMIT TO DRILL APR 2 9 2014 20 AAC 25.005 ��� 1 a.Type of work: 1 b.Proposed Well Class: ®Development Oil 0 Service-Winj ®Single Zone 1 c.Specify if w 0 Drill . 0 Lateral 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 Coalbed Gas 0 Gas Hydrates 0 Redrill 0 Reentry 0 Exploratory 0 Service-WAG 0 Service-Disp 0 Geothermal 0 Shale Gas 2.Operator Name: 5.Bond • 0 Blanket 0 Single Well 11.Well Name and Number: BP Exploration(Alaska) Inc. Bond No 6194193, PBU E-36B• 3. Address 6.Proposed Depth: 12.Field/Pool(s) P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 12075' TVD 9150'ss - Prudhoe Bay/Prudhoe Bay - 4a.Location of Well(Governmental Section): 7.Property Designation(Lease Number): Surface: ADL 028304&028299 1706'FNL,882'FEL, Sec.06,T11 N, R14E, UM • Top of Productive Horizon: 8.Land Use Permit: 13.Approximate Spud Date: 136' FSL,2425'FEL, Sec.31,T12N, R14E, UM June 15,2014 Total Depth 9.Acres in Property: 14.Distance to Nearest Property: 1975' FNL, 1457' FEL, Sec.06,T11 N, R14E, UM 2469&2459 9320' 4b. Location of Well(State Base Plane Coordinates-NAD 27). 10.KB Elevation above MSL: 64.1' • feet 15.Distance to Nearest Well Open Surface: x 664102 • y-5975350 • Zone- ASP4 GL Elevation above MSL: 28.9' . feet to Same Pool: 80' 16.Deviated Wells: Kickoff Depth: 9520' feet • 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 95 • degrees Downhole. 3258 . Surface. 2378 • 18. Casing Program Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD ND MD ND (including stage data) 3-1/4" 2-7/8" 6.5# L-80 STL 3225' 8850' 8415'ss 12075' 9150'ss 52 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth ND(ft): Plugs(measured). Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured) 11861' 9062' None 11822' 9060' 11794', 11795' Casing Length Size Cement Volume MD ND Conductor/Structural 110' 20" 260 sx Arctic Set(Approx.) 110' 110' Surface 3613' 10-3/4" 1140 sx CS III, 375 Class'G', 140 sx CS II 35'-3648' 35'-3638' Intermediate 9194' 7-5/8" 490 sx Class'G' _ 35'-9229' 35'-8785' Production Liner 2978' 3-1/2"x 3-1/16" 119 sx Class'G' 8883'-11861' 8508'-9062' x 2-7/8" Perforation Depth MD(ft). 11600'- 11800' Perforation Depth ND(ft): 9062'-9059' 20.Attachments: 0 Property Plat 0 BOP Sketch 0 Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis 0 Diverter Sketch 0 Seabed Report 0 Drilling Fluid Program 0 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative' Date 22. I herebycertifythat the foregoing is true and correct: 9 9 Contact James Niedermeyer,564-5302 Pri ted Name John McMullen Title Engineering Team Leader Email James.Niedermeyer@bp.com frvirP f 62 3-01//v ✓/Ae(' 2 Signature _ Phone 564-4711 Date I— /y Commission Use Only Permit To Drill API Number: Permit Approval Da e: See cover letter for Number. -� ? 50-029-22563-02-00 (2)l I \Ili other requirements: Conditions of Approval. If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas [r/ contained shales: _/ Other: S a p f-c 5 f D 3 5Q 6) 1J S r Samples Req'd ❑yes No Mud Log Req'd: Oyes 12 No I-12S Measures: gYes 0 lo Directional Survey Req'd: Yes ❑❑No Spacing exception req'd: 0 Yes B'No inclination-only svy Req'd: 0 Yes tr]No P APPROVED BY c— /_/ APPROVED BY /6) THE COMMISSION Date I L.( Form 10-401 Revised 10/2 12 This pe i I S r rLom the date of approval(20 AAC 25.005(g)) Submit For?nd Attachments In Duplicate l7LFS////4 V/Sir _ S` 4-1Z;3Z; IV To: Alaska Oil &Gas Conservation Commission bp From: James Niedermeyer CTD Engineer Date: April 29, 2014 Re: E-36B Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack from well E-36A using Nordic 2 to a target in Ivishak Zone 2. Rig Work(scheduled to begin June 15th, 2014) 1. MIRU and test BOPE 250 psi low and 3,500 psi high. 2. Mill 2.74" window at 9,520' and 15' of rathole. • 3. Drill build: 3-1/4" OH, 380' (25 deg DLS planned). 4. Drill lateral: 3-1/4" OH, 2,175' (12 deg DLS planned). 5. Run 2-3/8" liner leaving TOL at 8,850' MD. 6. Pump primary cement job outside window: 10.8 bbls, 15.8 ppg,TOC at 9,850'. 7. Perform liner cleanout and MCNL/GR/CCL log. 8. Perforate liner based on log interpretation (^'100'). 9. Freeze protect well to 2,500' MD. 10. Set TWC; RDMO. Post-Rig Work: 1. Re-install wellhouse,flowline. 2. Pull TWC. 3. Set GLV's 4. Set LTP. Mud Program: • Milling/drilling: 8.6 ppg PowerPro for milling window and drilling (641 psi over-balance). Disposal: • All Class I & II non-hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6. • Fluids>1% hydrocarbons or flammables must go to Pad 3. • Fluids>15%solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >11 must go to GNI. Hole Size: • 3-1/4" from 9,520' MD to 12,075' MD • Liner Program: • 2-7/8", 6.5 lb/ft, L-80,STL Solid liner 8,850' MD—12,075' MD.• • A minimum of 10.8 bbls of 15.8 ppg cement will be used for liner cementing. (TOC 9,850' MD). • The primary barrier for this operation: a minimum EMW of 8.6 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional: • See attached directional plan. Maximum planned hole angle is 95°, inclination at kick off point is 71.90. • • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property—9,320'. • • Distance to nearest well within pool—80' (E-35A). • Logging: • MWD directional, Gamma Ray and Resistivity will be run over all of the open-hole section. . • Cased-hole GR/CCL/MCNL logs will be run. Perforating: • 1.56" 6 spf, 1606 PJ HMX perf guns, 1" CSH work string, & 2-1/16" CSH • The primary barrier for this operation: a minimum EMW of 8.6 ppg. • • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti-Collision Failures: • The well fails anti-collision with the parent wellbore near the KOP, but does not present an HSSE risk. • The well fails anti-collision with the E-35A wellbore, which was abandoned when completing E-35B and does not present an HSSE risk. Hazards: • E pad is considered an H2S pad. Well E-102 had 110 ppm H2S on 01/09/2014. • Most recent H2S level on E-36A is 12 ppm recorded on 02/08/2013. • The lost circulation risk in E-36B is considered to be high with two fault crossings planned. Reservoir Pressure: • The reservoir pressure on E-36B is expected to be 3,258 psi at 8,800'ND. (7.1 ppg equivalent). r • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,378 psi. • An EMW of 8.6 ppg for this well will provide 677 psi over-balance to the reservoir. ✓ James Niedermeyer CTD Engineer CC: Well File Joseph Lastufka TREE= CNV I1AELLFEAD= FMC E_3 6 A SA :NOTES: WELL ANGLE>70°@ 9506' ACTUATOR= BAKER C INITIAL KB.ELE 64.1' BF.ELEV= 34.4' I [11 KOP= 1050' Max Angle= 94°@ 10758' O 2197' H4-1/2"OTIS MO SSSYN D=3.813" Datum MD= 9343' Datum TVD= 8800'SS 10-3/4'CSG,45.5#,NT-80,D=9.953' -I -- 3648' I4 GAS LIFT MAMJI LS ST MD TVD DEV TYPE VLV LATCH PORT DATE I ME 2 4830 4812 12 CA DOBK 16 08/20/13 LI 1 6265 6175 23 CA SO BK 20 0820/13 Minimum ID =2.370" @ 10485' 3-3/16" X 2-7/8" XO 8883' H3-1r2"BKR DEPLOYMENT SLV,D=3.00" 8892' —BTT AL PROFLE MLLED OUT TO 2.780" (05/07/13) 1 8902' —14-112"FES X NP,D=3.813" SE1-i jN'Q L'/R I 8914' H7-5/8"x 4-1/2"BKR S3 PKR,D=3.875" 1 L J ' H3-1/2'X3-3/16°X02786' 8933 3-1/2"LN ,9.2#,L-80 STL H 8933' .0087 bpf,D=2.992" I I 893T —14-12'FES X MP,D=3.813' ' , F8948' 1—4-12"FES XN NP,ID=3.80" 1 B E H 7lV D MLLED(12/19/08) 1 LN R 4-1/2"TBG,12.6#,L-80 NSCT, —1 8960' / \-- -I 8960' H4-1/2"OLEG,D=3.958" .0152 bpf,D=3.958" 8955'v —18 MD TT LOGGED 10/04/95 TOC —{ 9180' I 1♦ 1'1'1'1 MILLOUT WIDOW(E-36A) 9230'-9238'? 11111114 1111111 1111111 141141 TOP OF WHPSTOCK —1 9224' I 41111. 4. 1'11414111/6 RA TAG —1 9234' '4,1411111 10485' --13-3/16"X 2-7/8"X0,13=2.370" Ai 7-5/8"CSG,29.7#,L-80 NSCC, 982T 1'1'1'1'1 11794' RSI-t 2-7/8"WFT �'1; .0459 bpf, D=6.875" 111111111111111111/ 1cBP(08/11/13) 1111111111111111111 TD H 9850• _ — .4.4.1.4.4.4.4.4.4.. 11795' 1 FISFt 2-7/8" FES FASDRIL.L PERFORATION SUMMARY (05/05/13) REF LOG:BH MVVDVGR/ROP/RES 01/14/09 3-3/16"LNR,6.2#,L-80 TCN, --I 10485' I ANGLE AT TOP FERE:84°@ 10290' .0076 bpf,D=2.80" SIZE Not Refer tM�ALSqo tion no/r historicalSQZ perf data SQZ /4v414*, ,11v,v SFF2" 6 10290-10340 S 02/18/10 05/08/13 2" 6 10750- 11050 S 01/17/09 05/08/13 PBTp —1-1-i6-211;- 2" 6 11200-11500 S 01/17/09 05/08/13 2" 6 11600-11800 0 01/17/09 2-7/8'LNR,6.16#,L-80 STL,.0058 bpf,D=2.441' —I 11861' r. DATE REV BY CONVENTS DATE REV BY C MM3 TS PRUDHOE BAY UNIT 07/05/95 ORIGINAL COMPLETIOI 06/12/13 CF/JMD MLUSET PLUG/FISH/CMT SQZ(05/10/13) WELL: E36A 01117/09 NORDIC 1 CTD SIDETRACK(E-36A 0827/13 SJW/JMD MLLED CMT/SET FISH(08/11/13) PERMT No:"208149 01/24/09 /TLH CORRECTIONS 08/27/13 BSE1JM3 GLV ClO(08/20/13) AR No: 50-029-22563-01-00 11/18/09 CR/JMD DRLG DRAFT COQ SEC 6,T11 N,R14E,1706'FAL&882'FEL 03/02/10 AB/RPC PERF ADDITIONS(02/18/10) 04/29/13 CDS PJC GLV C/O(04/25/13) Jj BP Exploration(Alaska) TREE WaLI- CM/� VV�L.HEAD= FMC E-36 B SA_ I NOTES: WELL ANGLE>70°@ 9506' 'ACTUATOR= BAKER C PROPOSED IJITIAL KB.ELE 64.1' BF.ELEV= 34.4' I KOP= 1050' Max Angle= 94°@ 10758' I 2197' H4-1/2"OTIS HXO SSSVN,D=3.813" Datum MD= 9343' 0 Datum TV D= 8800'SS - 10-3/4"CSG,45.5#,NT-80,U=9.953" I 3648' GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE Minimum ID = 2.370" 10485 2 4830 4812 12 CA DOME BK 16 08/20/13 ' I 1 6265 6175 23 CA SO BK 20 08/20/13 3-3/16" X 2-7/8" XO 4 8883' H3-1/2"BKR DEPLOYMENT SLV,D=3.00" 8850' H3-1/2"BKR DEPLOYMENT SLV,ID-3.00" 8892' H BTT AL FROFLE MLLED OUT TO 2.780" 8856' - 13-1/2"X 2.891"XO,D=2.70" I (05/07/13) 8857' -I 3.27"BKR DEPLOYMENT SLV,D=2.25" .' BEHIND 8902' H4-1/2"HES X NP,D=3.813" LNR Z8933' 8914' H 7-5/8"x 4-1/2"BKR S3 PKR,D=3.875" Z8933' H 3-1/2"X 3-3/16"XO,D=2.786" '` '' 8937' H4-1/2"HES X NP, D=3.813" 3-1/2"LNR,9.2#,L-80 STL, H 8933' .0087 bpf, D=2.992" I I 8948' 4-1/2"HES XN NP,D=3.80" BEHIND MLLED(12/19/08) LNR 4-1/2"TBG,12.6#,L-80 NSCT, H 8960' / \ 8960' H4-1/2"WLEG,D=3.958" .0152 bpf,D=3.958" - 8955' HELM)TT LOGGED 10/04/95 MLLOUT WWOW(E-36A) 9230'-9238' TOC 1 9180' MILLLOUT WINDOW(E-36B) 9520'-9526' *•• *��V' *At* RA pup -I -10100' I o. .44. t0C —I --9850' 1 TOP OF WHPSTOCK 9224' } 4��4.''''A.A., ' \_ zPE -12038' RA TAG—I 9234' --. •'1'.:.�;� i..,, .1 t--:1...M.1•••17--1 T--7 r•..�rs.".,11 u r -t r�w s *Yee 2-3/8"LNR 4.7#,L-80 TH511 H 12075' I 7-5/8"CSG,29.7#,L-80 NSCC, i 9827' 4.74 •e AvAveAv1 e 1 e i� .0039 bpf,ID=1.995" 0459 bpf, D=6.875" ���OTO ������������������� 10485' H3-3/16"X 2-7/8"XO, D=2.370" TD H 9850' 4.41.114.4.j14.4.4.e 9520' I 3-3/16"Packer Whipstock w/Ri' 11795' FISH:2-7/8" PERFORATION SUMMARY tag(_/_/_) HES FASDRLL RB LOG:BHI MWD/GR/ROP/RES 01/14/09 (05/05/13) LNR,6.2#,L-80 TCI, 10485' , (05/05/13) ANGLE AT TOP PERF:84°@ 10290' .0076 bpf,ID=2.80" Note:Refer to Production DB forhiistorical pert data ��4* SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 4** 2" 6 10290-10340 S 02/18/10 05/08/13 11794' —FISH:2-7/8"WFT 2" 6 10750-11050 S 01/17/09 05/08/13 CBP(08/11/13) 2" 6 11200-11500 S 01/17/09 05/08/13 " 2" 6 11600-11800 0 01/17/09 PBTD 11820 , 2-7/8"LNR,6.16#,L-80 STL,.0058 bpf,ID=2.441" —I 11861' 01/17/09 NORDIC 1 CTD SIDETRACK(E-36A 08/27/13 SJW/JND MILLED CMT/SET FISH(08/11/13) FER T Nb:' 08149 01/24/09 /TLH CORRECTIONS 08/27/13 BSE/JMD GLV C/O(08/20/13) API Nb: 50-029-22563-01-00 11/18/09 CR/JMD DRLG DRAFT CORRECTII :;25/14 JKN E-36B Proposed SEC 6,T11 N, R14E,1706'FNL 8 882'FEL 03/02/10 AB/RPC PERF ADDITIONS(02/18/10) _ 04/29/13 CDJ/PJC GLV CJO(04/25/13) BP 6cploration(Alaska) BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB E Pad E-36 -Slot 36 E-36B Plan: Plan 4 BP Coil Tubing Report 24 April,2014 X104.0.0 0 Rill BP HUGHES BP Coil Tubing Report bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36-Slot 36 Project: Prudhoe Bay TVD Reference: Mean'Sea Level • Site: PB E Pad MD Reference: 57:36 6/12/1995 00:00 al 64.10usft(generic drilling rig • Well: E-36 North Reference: True Wellbore: E-36B Survey Calculation Method: Minimum Curvature Design: Plan 4 • Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) ° System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB E Pad,TR-11-14 • Site Position: Northing: 5,973,180.88 usft Latitude: 70°19'59.134 N From: Map Eluding: 662,538.97 usft Longitude: 148°40'53.05 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.24° • • Well E-36-Slot 36,E-36 Well Position •N/-S 0.00 usft Northing: 5,975,349.76 usft • Latitude: 70°20'20.323 N l +E/-W 0.00 volt Fasting: 664,102.33 usft - Longitude: 148°40'6.01 W Position Uncertainty 0.01kft Wellhead Elevation: usft Ground Level: 28.90 usft • Wellbore E-36B Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2013 4/1/2014 19.89 81.03 57,635 Design Plan 4 . Audit Notes: Version: Phase: PLAN Tie On Depth: 9,506.00 Vertical Section: Depth From(TVD) +N/-S eE/-W Direction tusk) (use) (use) (°J -30.00 0.00 0.00 170.00 4/24/2014 4•0624PM Page 2 COMPASS 5000.1 Build 61 Mill BP BAI06 HUGS BP Coil Tubing Report by HE INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36-Slot 36 Project: Prudhoe Bay ND Reference: Mean Sea Level Site: PB E Pad MD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig Well: E-36 North Reference: True Wellbore: E-36B Survey Calculation Method: Minimum Curvature Design: Plan 4 Database: EDM R5K-Alaska PROD-ANCP1 Survey Tool Program Date 4/24/2014 ..w ,. : _ ._ ILS.. ; {P:: ..,, x,za•P�s, `* a a kFrom To } � h. (uft) (usft) Survey(Wellbore) Tool Name Descriptionk . T yg ( itt 151.60 9,223.90 1:MWD-Standard(E-36) MWD MWD-Standard 9,223.90 9,506.00 MWD(E-36A) MWD MWD-Standard 9,506.00 9,770.00 Plan 4(E3613) INC+TREND Inclinometer+known azi trend 9,770.00 12675.00 Plan 4(E-36B) MWD MWD-Standard Planned SurveyVg Y ., MD Inc Azi TVDSS NIS 81W Northing Easting DLeg V.Sec 'Face (usft) (^) (°( (usft) (usft) (usft) (usft) (tisk) 0100usft( (usft) (°( 1 9,506.00 71.69 282.67 8,871.26 1,700.40 -1,322.28 5,977,020.70 662,743.25 21.11 -1,904.18 -72.40 TIP 9,520.00 71.93 279.56 8,875.64 1,702.97 -1,335.33 5,977,022.98 662,730.14 21.17 -1,908.97 -85.84 KOP 9,540.00 70.24 278.91 8,882.12 1,706.00 -1,354.01 5,977,025.60 662,711.41 9.00 -1,915.21 -160.00 End of 9 Deg/100'DLS 9,600.00 65.80 263.44 8,904.69 1,707.26 -1,409.40 5,977,025.64 662,656.00 25.00 -1,926.06 -110.00 9,650.00 63.35 249.86 8,926.23 1,696.92 -1,453.21 5,977,014.35 662,612.44 25.00 -1,923.48 -104.18 4 9,700.00 63.92 235.92 8,948.52 1,676.56 -1,492.94 5,976,993.13 662,573.16 25.00 -1,910.34 -90.50 9,800.00 68.86 209.12 8,989.18 1,609.59 -1,553.80 5,976,924.85 662,513.78 25.00 -1,854.95 -84.28 5 9,900.00 85.79 190.18 9,011 23 1,518.31 -1,585.82 5,976,832.90 662,483.77 25.00 -1,770.62 -50.00 End of 25 Deg/100'DLS . 10,000.00 94.99 182.47 9,010.54 1,419.11 -1,596.82 5,976,733.48 662,474.95 12.00 -1,674.83 -40.00 7 10,100.00 93.85 170.49 9,002.81 1,319.78 -1,590.70 5,976,634.32 662,483.24 12.00 -1,575.95 -95.00 8 10,200.00 89.69 159.22 8,999.71 1,223.48 -1,564.62 5,976,538.62 662,511.42 12.00 -1,476.58 -110.00 9 10,300.00 89.70 147.22 9,000.24 1,134.37 -1,519.65 5,976,450.52 662,558.32 12.00 -1,381.02 -90.00 10,400.00 89.72 135.22 9,000.75 1,056.55 -1,457.14 5,976,374.10 662,622.52 12.00 -1,293.53 -89.94 4242014 4:06:24PM Page 3 COMPASS 5000.1 Build 61 1 sae BP BAKER MONIS S BP Coil Tubing Report bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36-Slot 36 Project: Prudhoe Bay ND Reference: Mean Sea Level Slee: PB E Pad MD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig Well: E-36 North Reference: True Wellbore: E-36B Survey Calculation Method: Minimum Curvature Design: Plan 4 Database: EDM R5K-Alaska PROD-ANCP1 Planned Survey MD Inc Azi TVDSS NIS 81W Northing Easting DLeg V.Sec TFace (usft) 11 (°I (usft) (usft) (ualt) (usft) lusftl (°/toousft) (usft) (°I 10,430.00 89.73 131.62 9,000.89 1,035.93 -1,435.35 5,976,353.96 662644.75 12.00 -1,269.44 -89.88 • • 10 10,500.00 89.73 140.02 9,001.22 985.78 -1,386.61 5,978,304.89 662,694.57 12.00 -1,211.58 90.00 10,600.00 89.75 152.02 9,001.88 903.01 -1,330.83 5,976,223.36 662,752.15 12.00 -1,120.38 89.96 10,700.00 89.77 164.02 9,002.11 810.44 -1,293.47 5,976,131.64 662,791.53 12.00 -1,022.74 89.91 10,800.00 89.81 176.02 9,002.48 712.14 -1,276.17 5,976,033.75 662,810.97 12.00 -922.92 89.85 10,850.00 89.83 182.02 9,002.64 662.17 -1,275.32 5,975,983.81 662,812.91 12.00 -873.56 89.81 11 10,900.00 89.83 176.02 9,002.79 61220 -1,274.47 5,975,933.88 662,814.86 12.00 -824.21 -90.00 11,000.00 89.84 164.02 9,003.08 513.89 -1,257.17 5,975,835.98 662,834.30 12.00 • -724.39 -89.98 11,100.00 89.85 152.02 9,003.36 421.33 -1,219.81 5,975,744.26 662,873.67 12.00 -626.75 -89.95 11,200.00 89.87 140.02 9,003.80 338.55 -1,164.03 5,975,662.73 682,931.25 12.00 -535.54 -89.91 12 11,300.00 85.80 151.32 9,007.39 256.19 -1,107.77 5,975,581.63 662,989.30 12.00 -444.66 110.00 ' 11,320.00 85.00 153.59 9,009.00 238.52 -1,098.55 5,975,564.18 662,998.91 12.00 -425.66 109.57 13 11,400.00 84.23 143.98 9,016.52 170.48 -1,057.32 5,975,497.05 663,041.61 12.00 -351.49 -95.00 11,490.00 83.57 133.14 9,026.11 103.50 -998.18 5,975,431.38 663,102.19 12.00 -275.26 -94.10 14 • 11,500.00 83.57 131.93 9,027.23 96.78 -990.86 5,975,424.83 663,109.68 12.00 -267.37 -90.00 11,590.00 83.71 121.06 9,037.23 43.67 -919.06 5,975,373.30 663,182.60 12.00 -202.60 -89.86 15 • 11,600.00 83.25 122.18 9,038.37 38.46 -910.60 5,975,368.28 683,191.17 12.00 -196.00 112.60 11,700.00 78.82 133.47 9,054.00 -21.95 -832.69 5,975,309.59 663,270.38 12.00 -122.98 112.47 • 11,800.00 74.82 145.10 9,076.87 -95.54 -769.25 5,975,237.41 663,335.41 12.00 -39.49 110.71 11,815.00 74.27 146.87 9,080.86 -107.53 -761.16 5,975,225.61 663,343.76 12.00 -26.28 108.05 ' 16 4242014 4:06:24PM Page 4 COMPASS 5000.1 Build 61 Hill BP BAKER ""MES BP Coil Tubing Report bp 17TrQ Company: North America-ALASKA-BP Local Coordinate Reference: Well E-36-Slot 36 Project: Prudhoe Bay ND Reference: Mean Sea Level Site: PB E Pad MD Reference: 57:36 6/12/1995 00:00 4 64.10usft(generic drilling rig Well: E-36 North Reference: True Wellbore: E-36B Survey Calculation Method: Minimum Curvature Design: Plan 4 Database: EDM R5K-Alaska PROD-ANCP1 Planned Survey • MD Inc Azi TVDSS NIS E/W Northing Easting DLeg V.Sec TFace (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) (°) 11,860.00 74.16 141.26 9,093.11 -142.57 -735.76 5,975,191.13 663,369.92 12.00 12.64 -92.00 3.5 11,900.00 74.17 136.27 9,104.04 -171.50 -710.41 5,975,162.76 663,395.90 12.00 45.54 -90.47 12,000.00 74.71 123.83 9,130.95 -233.34 -636.82 5,975,102.55 663,470.81 12.00 119.21 -89.11 . 12,075.00 75.57 114.56 9,150.23 • -268.65 -573.61 5,975,068.64 663,534.77 12.00 164.96 -85.78 • TD at 12075.00-2718" Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 11,860.00 9,093.11 3.5 3.500 4.125 12,075.00 9,150.22 2 7/8" 2.875 4.125 _..J 4/24/2014 4 06.24PM Page 5 COMPASS 5000.1 Build 61 • Mill BP wins BP Coil Tubing Report 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36-Slot 36 Project: Prudhoe Bay ND Reference: Mean Sea Level Site: PB E Pad MD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig Well: E-38 North Reference: True Wellbore: E-36B Survey Calculation Method: Minimum Curvature Design: Plan 4 Database: EDM R5K-Alaska PROD-ANCP1 Plan Annotations Measured Vertical Local Coordinates Depth Depth r-Nl-S +E/-W (usft) (usft) (usft) (usft) Comment 9,506.00 8,871.26 1,700.40 -1,322.28 TIP 9,520.00 8,875.84 1,702.97 -1,335.33 KOP 9,540.00 8,882.12 1,706.00 -1,354.01 End of 9 Deg/100'DLS 9,650.00 8,926.23 1,696.92 -1,453.21 4 9,800.00 8,989.18 1,609.59 -1,553.80 5 9,900.00 9,011.23 1,518.31 -1,585.82 End of 25 Deg/100'DLS 10,000.00 9,010.54 1,419.11 -1,596.82 7 10,100.00 9,002.81 1,319.78 -1,590.70 8 10,200.00 8,999.71 1,223.48 -1,564.62 9 10,430.00 9,000.89 1,035.93 -1,435.35 10 10,850.00 9,002.64 662.17 -1,275.32 11 11,200.00 9,003.60 338.55 -1,164.03 12 11,320.00 9,009.00 238.52 -1,098.55 13 11,490.00 9,026.11 103.50 -998.18 14 11,590.00 9,037.23 43.67 -919.06 15 11,815.00 9,080.86 -107.53 -761.16 16 12,075.00 9,150.23 -288.65 -573.61 TD at 12075.00 Checked By: Approved By: Date: 424/2014 4 06.24PM Page 6 COMPASS 5000.1 Build 61 Project:Prudhoe Bay A• wy,+°ra-.tom WELLBORE DETAILS:E-366 ■lI RFER3CE OMNICN Will Site:PBE Pad (bndreN IN'DRMOMce 65ME�6SMt 38,TruNM Wen:Ei6 Nv"t'Nn° E•368 NeistICVD1Pelen0B Wen SMLeal0 BAKER bp Wa6ae:EacB emtur erm SMIm(vSnilMan SC.35801000D NUtiNE9 P6n:Plm4 or amM VmaO WalbuO E-36A Wound Up,R/vMn s7.330YM975mmQfiL10llmMt dinged E1 M.eeaume Tb m Aro ssae.00 oltarMm Mrod wee.na,�w. llVTEQ E-46036A- 8-36836 IW0 . NELL DETAILS:E.36 Ground Lava 28.90 1630- 8966b,661.1 aNIS -EWN Northing Easing La4eude LMMWd. 51.6 0.00 000 5015366.76 86410233 70'2020.323N t10.40001W 38 1500 SECTIONIIETALS 6M8TA7I0118 1350 - --_.. --- E-366L11M2I-- ' Sec MO Inc Ali =TIM .86S +EI-W Oleg 7Fe0e V801 Trod IAD An610 0 -+ 1 950600 71.69 28267 881126 1700.40-1322.28 000 000-1904.18 9506.00 IP 1200 2 9520.00 7193 27956 8875.64 1702.97 -133533 2117 -8584-1908.97 952000 OP 3 954000 7024 278.91 8882.12 170600.135401 900 200.00-191521 9540.00 nd 419D9g'1000LS 01050 - - 4 9850.00 6335 24986 8926.23 1696.92-145321 2500 250.00-1923.48 9650.00 5 983000 6886 209.12 8989.78 160959 -1553.83 2500 269.50-1851.95 9600.00 E-3613E �' 6 990000 8579 19018 901123 1516.31 -15982 2500 310.00-177062 990000 nd 4125Neg7100'DLS °900 - 7 10000.00 9499 18247 901054 141911 -1596.82 1200 32000-167483 • 10000.00 045 8 10100.00 9385 17049 9002.81 131978-159.70 1200 265.00-157595 10100.00 .�.750 -I-- - -- 1 7;-360 Target j 9 1020200 8969 15922 899.71 1223.48 -1564.62 1200 250.00-1476.58 10200.00 .-. ' 10 10430.00 8973 131.62 90009 1035.93 -1435.35 1200 270.00-1269.44 10433.00 0 L�0 E-36B 0.012 11 10850.00 89.83 18202 9002.64 662.17-127532 1200 9.00 -87356 10850.00 1 C ---- - - - '--' 12 11200.00 8987 14002 900360 318.55-116403 12.00 270.00 -535.54 1129.00 2 o F:360161-66t4.1 13 1132000 8500 15359 90900 218.52 -1095 12.00 110.9 -2566 1132000 3 450- -- - --_ -- 14 1149.9 83.57 133.14 9026.11 103.50 -99818 12.00 26500 -27526 11490.00 4 5-36111.014 15 1159.00 83.71 121.9 903723 43.67 -91906 12.00 27000 -202.60 1159.9 5 r 16 1181500 7427 146.87 9986 -10753 -761.16 12.00 112.60 -26.26 11815.9 6 -C 300- - - - - 17 1207500 7557 114.56 915023 -2965 573.61 1200 268.9 16496 12075.9 7091120759 O h 150 E-3611fauYi 3R svM 368 Target 6.1 I E-369 Fault AAA / • •• -150 13-J66 14x4417.1 -306-- Ei6E-169 •2530-2400-2230-219-1950-1100-1650-1500-1330-129-1050 -900 -750 -600 130 39 -150 0 130 W est- ast 19 to 1 /615111111- : 1 , ' i 1,16;_ I ....-.._ _ ._- --- 4-- rn8775 - //-- ----'- ---- .-- -- 1_---I .._..•--,---T-I __ ......._ - ---'-- 8940 AOP. r J -� - - .-- I .1 F_6F:361 - 4 fa, g71dE-36BT E-369T 121 - P-3611144011 - ^ 8905 EJ6BT 11.1 I ar/e E-369 Tugs 4.1 __: r- E-36B Tarpu5.1 -_ _ I 1? End of 25 Oe9100'DI.S - ___�'_ I4./ IS -06816760160 IE-366 •� 933 E-'./F:?6 • 7 g. 9 10. II 12 • 13. 1 y 9191- 16. T t._ _'_-- 9165. i _ I. - j _ -. _. ____.i J TD11207 __. F' 9230 ' I j __ 1 +_ j �- --. _-_..- -F---- 9293 -._.._� .y �.. { ----t- , I_ Mem Sea ev I ; 9360--' 4- -,-- -. _T-� _+..__ _-_ - - - - -__�-_-- • -209-2015-1950-1815-1820-1755-1690-1625-1560-1495-1430-1365-1300-1235-1170-1105-1040-975 -9111 -045 -710 -715 -650 -583 -520 155 -39 -325 -29 -195 -130 55 0 65 130 193 260 325 39 Verti cal Section at 170.000(65 usft/in) Project:Prudhoe Bay /�• MronRrin I WELLBORE DETMLS:0468 a]IId9(EIKOWA3101 H`. See:PB E Pad 1.0•804.1a 0-368 (baude161E)Risese MYIE3fi-9d36,Pun. BAKER Well.E-30 5552 Se•tpr M., VSecke W)Mesee 51360IoI095WW8B410 10eMrt dergr9l bp Welborn:EJ88 011 semih3)Meles®9d-xmauNaaoL3 1RlGFE$ 0 f48iP ,41)FacE4$B) Pererlie on MDe:E-36A Lerma Oen Pewee 57 3561DIe95WWBe4I0I110saedMryry) Tie on :9506,00 Cealem Wypd 6YsnanCuvNa INTEQ 1 P leo0— _... r 1 1 E-36/E36A j.� - 10"a111i1 1 �IKMa RITIM,_-- !!ET• __ _ yo o !')311 \` 5 G-36 . ■,. \100 100 0 1910 - -_ E , ;+11q 16za -04/E-04A _, I „ \ E-04/E.l l'\,ilL. If; 1536 J 5:00 1410■■11■■ \. _ ■�� 1)\)� 1 _ . 1356■■11■■ .- --- ilk \, L I1Ju '■ \ . _I i liblik ��.. -1170 .■ \ _. weo Er1WE-10A III I. _. J 990 ■■ - Oil* 900 1 ' _ •••a 810 __. ___ — 525.2 - E-13/£' �. c 720 `,7/E-27A - :: I E rn • .-.630 I•.: •=29 _ _ #W - +-. ■ 1 9 E-35/E-35 540 -- ■ ,, ,150 - _ --- ./ pP ■ E-05 -05 } _ . 4El �� 180 \--". k 1111 OP\ 90 o l 2252. r__...ii— .�\- -_S >' 6/E-16APB1 i�� i5/E•15BPB I -360- _ ■■■■■■- _ fg x44,111 150 - --- 7E- il 35 I E-27/E.,7 E-33/E-33A E-33/E•3 �5/E-JSPB� �I -21.. _-Pr If ` E 11 92'1895 a 0:as g6ri0W •-n'n""Mno dol • . _ - `37/�-37 E-0 V� - E3A _ - -21]903/E-2f700-2610-2520-2430-2340-2250-2160-2070-1980-1890-1800.1710-1620-1530-1410-1150--1260-1170-1080 -990 -900 -81!"-726 -630 -540 -450 -360 -270 -180 -90 0 90 180 270 360 450 West(-)/East(+)(90 usft/in) • Project Prudhoe Bay umewn 144+ WELLBORE DETAILS.E-368 q]3]83YEIKtl4MnW11111111 SitePB a'a�� . : A OwUros04EIRaararce Wel 6E•Sn36.ineWln • Well:E-366 .or• E-36B AMA OVO)Rderencs 57 3..1.0.41 61 Ad(genrc.nprpl WaWfa:EJ6B °mW�e,.N 5ved N61R44ws B 266,1•351060NOWE7 obpWan:Wan 41J61EJ6BI ell tare E-36A ParentTe on MD'.950600 M4nve40yln R9aao:5).3i6',21,ffifB60 Qif 61.,Gdl(94rec Tlnpryl clonalM4no4 MnmmQnAue INTEQ ses + ___ —___ E- _ .x.-103/E-103 .. 6-35/E-30A '-36A 540 . o. - - - 495 - - - - .. v4¢ - 450 -. _ _ 405: - -. ---_. _/ - _ - 360' : __.. - 270.1 E-291E-29 2251 6-15/6-15BPB1.._... 1011011111All _ M E IS/&ISA it G 135 - .. _ 90 - - '. ._gip. / -E-281E-28A .42 0 .E, ,.._ , Nisi"1\,,,,.... _ . . . X/P E-281E-28 4. dit .�� -- 180 -225 .270 -315 �B8 -3604,,,j_ .. - -405 - - - E-36/E-36B 5/E-35 495 E-27/E, -585, E.27/E-27 E-331E-3 .. _. 12/199500:00064.i 0uae(94044.9 WIN nal E-33/E-33A E-35/E-35PB E-21/E- :-371E-37 _ - . .. _ __ _- • - _ .�._ -1530-1445-1440-1395-1350-1305-1260-1215-1170-1125-1080-1035 -990 -945 -900 -855 -WB/-765 .720 -675 .630 -585 -540 -495 .450 -405 -360 JI3 -270 -225 .180 -135 -90 .45 0 45 90 135 West(-)/East(+)(45 usft/in) letemittreer Project:Prudhoe Bay m ANiILOLLI510N SETTINGS COW..Mows u.sxx auv0n y Site:PB E Pad _'-�� erpdatnn Menet MD,demob SOLO Well:E-36 BAKER Depth su Range Rem:950800 To 12075.00 Ili Resins Sidled By:Rana n4W.31E.306 c.>sYa.�.us�v+s. s..uan,e r,...a�•e.,n.e, Wellbore:EJ68 RHeranca:PNn:61n 41E•38E•]B9) E,,,44,re s4tVr.. PUn:Plan 4(E-321EJ68) --. v.,,�..o,+an,e ew.e..e 1NTEQ WELLOEONI3:Ei6 Grew,LOW: Frain Colour To Me 2860 0N1.5 .6000 Ner1N1q 6atlh1 Laded Longitude 000 0.00 8175L06n F10233 70.20 D.JaX 140.406.01W 360 SECTION DETNLS Sec- MO Inc AS TU 4506 .El-W dab TFecn VeN90 Target 9520 9700 1 5506.00 71.69 28267 6871.26 1700.40 •1322.28 800 0.00 1322.28 2 9520.00 71.93 27056 8875.64 1702.97 -1335.33 21.17 -85.04 1335.33 3 9540.00 70.24 278.91 8882.12 1706.00-1354.01 9.00 200.00 135001 4 9650.00 63.36 24886 8926.23 1626.92-1453.21 25.00 250.00 1453.21 350 0 - 1011550- 12000 5 9800.00 68.86 20612 8989.18 160059-155180 25.00 269.50 1553.80 E- �' 6 9900.00 85.79 190.18 9011.23 1518.31 •1585.02 25.00 310.90 1585E12 E-36/E-360 340 '30 -20 7 10000.00 80.98 10247 901054 141 9 11 -159682 12.00 32000 1596.82 - 0 10100 00 93.85 170.48 000251 1319.78 •1590 70 12.00 26500 1590.70 330 \' ---- 910200.00 89.59 15922 899971 1223.48 -158062 1300 25000156062 it ' 10 1043000 89.73 131.62 9000.89 1035.93-143535 1200 27000 1435.35 1t 0850.00 69.83 18202 900264 66217 -127532 1200 90.00 127532 121120000 6987 14802 9003.80 33855 -1164.03 1200 27000 1164.03 ,r5l'S 13 11/31100 85.00 15359 900900 9862 -108855 1200 11000 109866 /� 32� Millp1.4 At t\�\ 0 11 11400 00 83.57 13314 9028.11 103.50 -888.10 12.00 265.00 998.18 r 690 E-35/E-350 15 1100 8321 12106 903723 4367 -91806 1200 27000 91906 16 11815 00 74.27 145.87 9080.65 .10753 -761.16 12.00 112.60 781.16 17011 171207500 7557 11156 9150.23 -25555 -57161 1200 268.00 573.61 310 fi '/ 961`3 150 "�• '7j5B 300. - i 130 / fi0 SURVEY PROGRAM . ..4, 110 I l B Dale 2014-04-25T0000ll0 Wide.:Yea venom Ch1 60D4PM From De*Te 5 YR01 Tool 15180 922100 1:MND 619 tlartl 1E-3MWD 290 k 70 r,, � 1763770 9223.00 9078.00 MWD IE-360) MWD 9506.00 9770.00 Plan 410.3681 INC•TREND - 9770.00 12075.00 Plan 1(E-369) MWD 280 .2° 50 O/ /� 77 60 sEU FNo... -_- -. . 5j7 30 114 g6'b 11706 270 0 •90 N m 6 m d0 ^ 260 100 60 250 8° /� 110 e 100 e.., ..-s,.-...�.,.m., 120 ........................... 240 /� z° 140 0 230 160 .SSQ4 130 60 220 /� 140 200 210 Ai_ sD 220 200 160 190 240 170 150 Azimuth from North[e]1e Centre to Centre Separation[20 u4t/in] ... "'" 1711 BAKER HUGHES LNTEQ North America - ALASKA - BP Prudhoe Bay PB E Pad E-36 500292256300 E-36B Plan 4 Travelling Cylinder Report 28 April, 2014 MtlII BP BAKER HUGHES Travelling Cylinder Report 0 bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36-Slot 36 Project: Prudhoe Bay TVD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Reference Site: PB E Pad MD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: E-36 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore E-36B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 4 Offset TVD Reference: Offset Datum Reference Plan 4 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 9,506.00 to 12,075.O0usft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,404.09 usft Error Surface: Elliptical Conic Survey Tool Program Date 4/25/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 151.60 9,223.90 1 :MWD-Standard(E-36) MWD MWD-Standard 9,223.90 9,506.00 MWD(E-36A) MWD MWD-Standard 9,506.00 9,770.00 Plan 4(E-36B) INC+TREND Inclinometer+known azi trend 9,770.00 12,075.00 Plan 4(E-36B) MWD MWD-Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 11,860.00 9,157.21 3.5 3.500 4.125 12,075.00 9,214.32 2 7/8" 2.875 4.125 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB E Pad E-01-E-01-E-01 Out of range E-01-E-01A-E-01A Out of range E-01-E-01APB1-E-01APB1 Out of range E-01-E-01 B-E-01 B Out of range E-02-E-02-E-02 Out of range E-02-E-02A-E-02A Out of range E-02-E-O2APB1-E-02APB1 Out of range E-02-E-02B-E-02B Out of range • E-03-E-03-E-03 Out of range E-03-E-03A-E-03A Out of range E-03-E-03A-Plan#14 Out of range E-04-E-04-E-04 9,808.96 9,525.00 864.85 304.48 582.61 Pass-Major Risk E-04-E-04A-E-04A 9,804.93 9,275.00 1,080.46 300.11 854.37 Pass-Major Risk E-05-E-05-E-05 Out of range E-05-E-05A-E-05A Out of range E-05-E-05APB1-E-05APB1 Out of range E-05-E-05B-E-05B Out of range E-06-E-06-E-06 11,975.00 9,400.00 1,388.21 312.83 1,080.54 Pass-Major Risk E-06-E-06A-E-06A 11,975.00 9,350.00 1,402.81 314.56 1,094.47 Pass-Major Risk E-10-E-10-E-10 Out of range E-10-E-10A-E-10A Out of range E-10-E-10B-E-10B Out of range E-100-E-100-E-100 Out of range CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 4/28/2014 11:40:12AM Page 2 COMPASS 5000.1 Build 61 • WPI BP BAKER HUGHES Travelling Cylinder Report 0 bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36-Slot 36 Project: Prudhoe Bay TVD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Reference Site: PB E Pad MD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: E-36 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore E-36B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 4 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB E Pad E-101-E-101-E-101 Out of range E-102-E-102-E-102 Out of range E-102-E-102-E-102 wp07 Out of range E-103-E-103-E-103 Out of range E-103-E-103-E-103 wp05 Out of range E-103-E-103PB1-E-103PB1 Out of range E-103-E-103PB1-E-103ph wp05 Out of range E-104-E-104-E-104 Out of range E-13-E-13-E-13 Out of range E-13-E-13A-E-13A Out of range E-14-E-14-E-14 Out of range E-14-E-14A-E-14A Out of range E-15-E-15-E-15 Out of range E-15-E-15A-E-15A Out of range E-15-E-15APB1-E-15APB1 Out of range E-15-E-15APB2-E-15APB2 Out of range E-15-E-15B-E-15B Out of range E-15-E-15BPB1-E-15BPB1 Out of range E-15-E-15C-E-15C Out of range E-15-E-15D-E-15D Out of range E-16-E-16-E-16 Out of range E-16-E-16A-E-16A Out of range E-16-E-16APB1-E-16APB1 Out of range E-17-E-17-E-17 Out of range E-17-E-17A-E-17A Out of range E-17-E-17A-Plan#7 Out of range E-18-E-18-E-18 Out of range E-18-E-18A-E-18A Out of range E-18-E-18B-E-18B Out of range E-19-E-19-E-19 Out of range E-19-E-19A-E-19A Out of range E-19-E-19B-E-19B Out of range E-19-E-19C-E-19C Out of range E-20-E-20-E-20 Out of range E-20-E-20A-E-20A Out of range E-20-E-20B-E-20B Out of range E-21-E-21-E-21 Out of range E-21-E-21 A-E-21 A Out of range E-21-E-21 B-E-21 B Out of range E-23-E-23-E-23 Out of range E-23-E-23A-E-23A Out of range E-23-E-23APB1-E-23APB1 Out of range E-23-E-23B-E-23B Out of range E-23-E-23C-E-23C Out of range E-23-E-23CPB1-E-23CPB1 Out of range E-23-E-23CPB2-E-23CPB2 Out of range E-24-E-24-E-24 Out of range E-24-E-24A-E-24A Out of range E-24-E-24APB1-E-24APB1 Out of range E-24-E-24APB2-E-24APB2 Out of range E-24-E-24B-E-24B Out of range CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 4/28/2014 11:40.12AM Page 3 COMPASS 5000.1 Build 61 WIWI BP BAKER HUGHES Travelling Cylinder Report 0 bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36-Slot 36 Project: Prudhoe Bay TVD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Reference Site: PB E Pad MD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: E-36 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore E-36B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 4 Offset ND Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB E Pad E-25-E-25-E-25 Out of range E-25-E-25A-E-25A - Out of range E-25-E-25APB1-E-25APB1 Out of range E-26-E-26-E-26 Out of range E-26-E-26A-E-26A Out of range E-27-E-27-E-27 Out of range E-27-E-27A-E-27A 10,225.00 10,800.00 1,404.08 230.84 1,175.76 Pass-Major Risk E-28-E-28-E-28 Out of range E-28-E-28A-E-28A Out of range E-28-E-28APB1-E-28APB1 Out of range E-29-E-29-E-29 Out of range E-29-E-29A-E-29A Out of range E-29-E-29A-Plan#2 Out of range E-31-E-31-E-31 Out of range E-31-E-31A-E-31A Out of range E-32-E-32-E-32 Out of range E-32-E-32A-E-32A Out of range E-32-E-32APB1-E-32APB1 Out of range E-32-E-32B-E-32B Out of range E-32-E-32PB1-E-32PB1 Out of range E-33-E-33-E-33 11,550.00 8,900.00 1,351.97 239.13 1,146.91 Pass-Major Risk E-33-E-33A-E-33A 11,550.00 8,900.00 1,351.97 239.35 1,146.74 Pass-Major Risk E-33-E-33B-E-33B 11,550.00 8,900.00 1,351.97 239.56 1,146.58 Pass-Major Risk E-35-E-35-E-35 Out of range E-35-E-35A-E-35A 11,729.86 9,925.00 88.68 10.12 88.06 Pass-NOERRORS E-35-E-35B-E-35B Out of range E-35-E-35PB1-E-35PB1 11,988.46 9,850.00 410.93 238.93 225.82 Pass-Major Risk E-36-E-36-E-36 9,514.07 9,550.00 85.64 20.60 66.71 Pass-Major Risk E-36-E-36A-E-36A 9,525.00 9,525.00 0.04 0.51 -0.28 FAIL-NOERRORS E-37-E-37-E-37 Out of range E-37-E-37A-E-37A Out of range E-37-E-37AL1-E-37AL1 Out of range E-37-E-37APB1-E-37APB1 Out of range E-37-E-37PB1-E-37PB1 Out of range E-39-E-39-E-39 Out of range E-39-E-39A-E-39A Out of range E-39-E-39A-Plan#5 Out of range Offset Design PB E Pad- E-04-E-04-E-04 Offset Site Error: 0.00 usft Survey Program: 100-C8-MAG-MS Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/-s .El-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (in) (usft) (usft) (usft) 9,520.00 8,939.73 8,300.00 7,681.12 29.94 65.62 -94.26 1,452.78 -1,805_75 6.875 1,359.77 298.48 1,210.94 Pass-Major Risk 9,531.35 8,943.35 8,325.00 7,702.57 30.45 65.96 -94.46 1,459.93 -1,816.42 6.875 1,342.40 30239 1,191.19 Pass-Major Risk 9,540.00 8,946.22 8,350.00 7,724.00 30.86 66.31 -94.59 1,467.17 -1,827.07 6.875 1,32520 305.63 1,172.13 Pass-Major Risk 9,547.59 8,948.82 8,375.00 7,745.42 31.57 66.66 -95.75 1,474.50 -1,837.68 6.875 1,308.13 308.11 1,153.95 Pass-Major Risk 9,560.00 8,953.25 8,400.00 7,766.82 3289 67.02 -97.65 1,481.92 -1,84826 6.875 1,291.16 311.41 1,135.36 Pass-Major Risk 9,569.41 8,956.74 8,425.00 7,788.19 34.25 67.37 -99.00 1,489.42 -1,858.84 6.875 1,274.30 315.46 1,11728 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 4/28/2014 11:40:12AM Page 4 COMPASS 5000.1 Build 61 • Oil. BP sls Travelling Cylinder Report 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36-Slot 36 Project: Prudhoe Bay TVD Reference: 57:36 6/12/1995 00:00(g 64.10usft(generic drilling rig) Reference Site: PB E Pad MD Reference: 57:36 6/12/1995 00:00(d 64.10usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: E-36 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore E-36B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 4 Offset TVD Reference: Offset Datum Offset Design PB E Pad- E-04-E-04-E-04 Offset Site Error: 0 00 usft Survey Program: 100-CB-MAG-MS Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth 4-WS +E/-W Hole Size Centre Distance Deviation lush) (usft) (usft) (usft) (usft) (usft) 1°) (usft) (usft) (in) (usft) (usft) (usft) 9,580.00 8,960.79 8,450.00 7,809.54 36.00 67.72 -100.48 1,496.97 -1,869.44 6.875 1,257.59 319.74 1,099.24 Pass-Major Risk 9,590.74 8,965.03 8,475.00 7,830.85 38.10 68.07 -101.92 1,504.57 -1,880.07 6.875 1,241.03 324.73 1081.50 Pass-Major Risk 9,600.00 8,968.79 8,500.00 7,852.14 40.11 68.43 -103.07 1,512.14 -1,890.76 6.875 1,224.66 328.91 1,064.21 Pass-Major Risk 9,611.34 8,973.49 8,525.00 7,873.44 42.77 68.78 -104.49 1,519.57 -1,901.54 8.875 1,208.48 333.95 1,047.04 Pass-Major Risk 9,620.00 8,977.17 8,550.00 7,894.76 44.97 69.14 -105.45 1,527.06 -1,912.24 6.875 1,192.40 337.63 1,030.40 Pass-Major Risk 9,630.77 8,981.82 8,575.00 7,918.10 47.77 69.49 -106.67 1,534.60 -1,922.85 6.875 1,176.43 341.83 1013.84 Pass-Major Risk 9,640.00 8,985.88 8,600.00 7,937.44 50.32 69.84 -107.60 1,542.19 -1,933.43 6.875 1,160.62 345.00 997.63 Pass-Major Risk 9,650.00 8,990.33 8,625.00 7,958.78 53.10 70.19 -108.60 1,549.74 -1,944.04 6.875 1,145.03 34829 981.70 Pass-Major Risk 9,660.00 8,994.82 8,650.00 7,980.16 55.92 70.55 -109.56 1,557.19 -1,954.65 6.875- 1,129.60 351.16 967.13 Pass-Major Risk 9,673.83 9,001.01 8,675.00 8,001.57 59.86 70.90 -111.08 1,564.52 -1,965.27 6.875 1,114.32 354.31 952.82 Pass-Major Risk 9,685.08 9,006.02 8,700.00 8,022.97 63.13 71.25 -112.10 1,572.00 -1,975.81 8.875 1,099.20 355.37 937.93 Pass-Major Risk 9,695.33 9,010.56 8,725.00 8,044.34 66.08 71.60 -112.93 1,579.64 -1,986.30 6.875 1,084.30 355.65 923.05 Pass-Major Risk 9,704.79 9,014.72 8,750.00 8,065.69 68.86 71.95 -113.59 1,587.22 -1,996.87 6.875 1,069.70 356.89 908.84 Pass-Major Risk 9,713.53 9,018.53 8,775.00 8,087.03 71.39 72.30 -114.09 1,594.75 -2,007.50 6.875 1,055.43 356.82 893.89 Pass-Major Risk 9,720.00 9,021.32 8,800.00 8,108.36 73.33 72.66 -114.19 1,602.32 -2,018.10 6.875 1,041.45 356.88 879.04 Pass-Major Risk 9,728.86 9,025.11 8,825.00 8,129.69 75.85 73.01 -114.62 1,609.98 4,028.89 6.875 1,027.78 356.18 862.95 Pass-Major Risk 9,735.59 9,027.96 8,850.00 8,150.99 77.82 73.37 -114.67 1,617.64 -2,039.27 6.875 1,014.48 355.64 847.02 Pass-Major Risk 9,740.00 9,029.80 8,875.00 8,172.28 79.13 73.72 -114.31 1,825.39 -2,049.85 6.875 1,001.58 355.34 831.41 Pass-Major Risk 9,747.44 9,032.89 8,900.00 8,193.54 81.23 74.08 -114.39 1,633.21 -2,060.44 6.875 989.10 354.11 814.28 Pass-Major Risk 9,752.66 9,035.03 8,925.00 8,214.75 82.73 74.44 -114.08 1,641.10 -2,071.04 6.875 977.08 353.26 797.76 Pass-Major Risk 9,760.00 9,038.00 8,950.00 8,235.93 84.88 74.80 -114.06 1,849.06 -2,081.68 6.875 965.57 351.87 780.39 Pass-Major Risk 9,760.00 9,038.00 8,975.00 8,257.08 84.88 75.18 -112.84 1,857.06 -2,092.35 6.875 954.58 352.11 766.00 Pass-Major Risk 9,766.13 9,040.44 9,000.00 8,278.23 85.76 75.52 -112.55 1,665.00 -2,103.06 8.875 944.08 347.62 750.24 Pass-Major Risk 9,770.02 9,041.97 9,025.00 8,299.38 86.33 75.89 -111.88 1,672.95 -2,113.76 6.875 934.11 344.77 735.35 Pass-Major Risk 9,773.63 9,043.38 9,050.00 8,320.53 88.85 7625 -111.12 1,880.95 -2,124.42 8.875 924.64 342.11 720.84 Pass-Major Risk 9,780.00 9,045.84 9,075.00 8,341.68 87.79 76.61 -110.78 1,689.00 -2,135.04 6.875 915.71 337.19 705.93 Pass-Major Risk 9,780.00 9,045.84 9,100.00 8,362.84 87.79 76.97 -109.38 1,897.09 -2,145.61 6.875 907.31 337.36 693.16 Pass-Major Risk 9,780.00 9,045.84 9,125.00 8,383.96 87.79 77.33 -107.94 1,705.31 -2,156.17 5.562 899.55 337.40 681.03 Pass-Major Risk 9,780.00 9,045.84 9,150.00 8,405.01 87.79 77.70 -106.48 1,713.70 -2,166.71 5.562 892.47 337.55 669.41 Pass-Major Risk 9,788.02 9,048.88 9,175.00 8,426.00 87.80 78.07 -106.27 1,722.28 -2,17724 5.562 886.01 327.04 658.40 Pass-Major Risk 9,790.24 9,049.70 9,200.00 8,446.92 87.80 78.43 -105.10 1,731.04 -2,187.77 5.562 880.30 32423 648.18 Pass-Major Risk 9,792.26 9,050.45 9,225.00 8,467.78 87.80 78.80 -103.88 1,739.98 -2,198.25 5.562 875.29 321.63 638.67 Pass-Major Risk 9,800.00 9,05328 9,250.00 8,488.59 87.81 79.17 -103.58 1,749.11 -2,208.67 5.562 871.02 311.83 630.33 Pass-Major Risk 9,800.00 9,053.28 9,275.00 8,509.36 87.81 79.54 -101.98 1,758.41 -2,219.03 5.562 867.37 311.95 622.28 Pass-Major Risk 9,800.00 9,053.28 9,300.00 8,530.07 87.81 79.91 -100.36 1,767.89 -2,229.32 5.562 864.44 312.08 615.01 Pass-Major Risk 9,800.00 9,05328 9,325.00 8,550.76 87.81 80.28 -98.73 1,777.58 -2,239.47 5.562 862.16 312.16 608.44 Pass-Major Risk 9,800.00 9,053.28 9,350.00 8,571.46 87.81 80.64 -97.09 1,787.50 -2,249.38 5.562 860.46 31225 602.55 Pass-Major Risk 9,800.00 9,053.28 9,375.00 8,592.15 87.81 81.01 -95.45 1,797.65 -2,259.07 5.562 859.34 312.33 597.35 Pass-Major Risk 9,800.00 9,053.28 9,400.00 8,612.84 87.81 81.37 -93.79 1,808.03 -2,268.52 5.562 858.82 312.42 592.85 Pass-Major Risk,CC 9,800.00 9,053.28 9,425.00 8,833.57 87.81 81.72 -92.14 1,818.46 -2,277.82 5.562 858.88 312.48 589.07 Pass-Major Risk 9,805.69 9,055.28 9,450.00 8,654.39 87.81 82.07 -91.23 1,828.79 -2,287.03 5.562 859.48 307.18 586.58 Pass-Major Risk 9,806.84 9,055.68 9,475.00 8,675.30 87.81 82.42 -89.73 1,839.01 -2,296.16 5.562 860.70 306.19 584.48 Pass-Major Risk 9,807.93 9,056.05 9,500.00 8,696.30 87.81 82.77 -88.22 1,849.12 -2,305.20 5.562 862.49 30529 583.16 Pass-Major Risk 9,808.96 9,056.40 9,525.00 8,717.39 87.81 83.10 -86.72 1,859.13 -2,314.15 5.562 864.85 304.48 582.61 Pass-Major Risk,ES,SF 9,809.93 9,056.73 9,550.00 8,738.55 87.81 83.44 -85.21 1,869.06 -2,323.00 5.562 867.79 303.74 582.84 Pass-Major Risk 9,810.85 9,057.03 9,575.00 8,759.80 87.82 83.77 -83.72 1,878.91 -2,331.75 5.562 87128 303.18 583.84 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 4/28/2014 11:40:12AM Page 5 COMPASS 5000.1 Build 61 Wall BP BAKER _ HUGHES Travelling Cylinder Report 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36-Slot 36 Project: Prudhoe Bay ND Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Reference Site: PB E Pad MD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: E-36 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore E-36B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 4 Offset TVD Reference: Offset Datum Offset Design PB E Pad- E-04-E-04-E-04 Offset Site Error: 0.00 usft Survey Program: 100-CEI-MAG-MS Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Waming Depth Depth Depth Depth Azimuth +NIS +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) )usft) (usft) (usft) (°) (usft) (usft) (in) (tisk) (usft) (usft) 9,811.73 9,057.32 9,600.00 8,781.13 87.82 84.11 -82.22 1,888.68 -2,340.40 5.562 875.34 302.88 58561 Pass-Major Risk 9,812.55 9,057.59 9,625.00 8,802.50 87.82 84.43 -80.74 1.89841 -2,348.97 5.562 879.98 302.63 588.17 Pass-Major Risk 9,820.00 9,059.96 9.650.00 8,823.89 87.82 84.76 -80.19 1,908.14 -2,357.50 5.562 885.35 29872 593.37 Pass-Major Risk 9,820.00 9,059.96 9,675.00 8,845.30 87.82 85.09 -78.62 1,917.88 -2,365.98 5.562 891.24 299.00 597.52 Pass-Major Risk 9,820.00 1059.96 9,700.00 8,866.72 87.82 85.41 -77.08 1,927.63 -2,374.41 5.562 897.75 299.27 602.48 Pass-Major Risk 9,820.00 9,059.96 9,725.00 8,888.16 87.82 85.73 -75.56 1,937.35 -2,382.82 5.562 904.87 299.56 60824 Pass-Major Risk 9,820.00 9,059.96 9,750.00 8,909.63 87.82 86.06 -74.07 1.946.99 -2,391.25 5.562 912.60 299.84 614.78 Pass-Major Risk 9,820.00 9.059.96 9.775.00 8,931.13 87.82 86.38 -72.60 1,956.54 -2,399.70 5.562 920.92 300.13 622.09 Pass-Major Risk 9,820.00 9,059.96 9,800.00 8,952.66 87.82 86.70 -71.16 1,966.02 -2,408.18 5.562 929.83 300.41 630.14 Pass-Major Risk 9,820.00 9,059.96 9,825.00 8,974.22 87.82 87.02 -69.74 1,97546 -2,416.61 5.562 93926 300.70 638.87 Pass-Major Risk 9,820.00 9,059.96 9,850.00 8,995.82 87.82 87.34 -68.35 1,984.88 -2,424.94 5.562 949.16 301.00 648.22 Pass-Major Risk 9,820.00 9,059.96 9,875.00 9,01747 87.82 87.66 -66.99 1,994.30 -2,433.17 5.562 95952 30129 658.16 Pass-Major Risk 9,820.00 9,059.96 9,900.00 9,039.15 87.82 87.97 -65.66 2,003.71 -2,441.31 5.562 970.32 301.58 668.67 Pass-Major Risk 9,820.00 9,059.96 9,925.00 9,060.85 87.82 8829 -64.35 2,013.13 -2,44941 5.562 981.60 301.89 67979 Pass-Major Risk 9,820.00 9,059.96 9,950.00 9,082.53 87.82 88.60 -63.08 2,022.55 -2,457.53 5.562 99341 302.19 691.54 Pass-Major Risk 9,820.00 9,059.96 9,975.00 9,104.21 87.82 88.92 -61.84 2,031.99 -2,465.67 5.562 1,005.73 302.49 703.91 Pass-Major Risk 9,820.00 9,059.96 10,000.00 9,125.86 87.82 89.23 -60.62 2,041.44 -2,473.84 5.562 1,018.53 302.80 716.87 Pass-Major Risk 9,820.00 9,059.96 10,025.00 9,147.50 87.82 89.55 -59.44 2,050.90 -2,482.05 5.562 1,031.82 303.11 730.39 Pass-Major Risk 9,820.00 9,059.96 10,050.00 9,169.11 87.82 89.87 -58.30 2,060.37 -2,490.32 5.562 1,045.60 303.42 744.47 Pass-Major Risk 9,820.00 9,059.96 10.075.00 9,190.68 87.82 90.19 -57.18 2,069.85 -2,498.65 5.562 1,059.85 303.74 759.04 Pass-Major Risk 9,820.00 9,059.96 10,100.00 9,212.23 87.82 90.51 -56.10 2,079.35 -2,507.05 5.562 1,074.55 304.05 774.12 Pass-Major Risk 9,820.00 9,059.96 10,125.00 9,233.80 87.82 90.81 -55.05 2,088.72 -2,515.52 5.562 1,089.64 304.72 789.38 Pass-Major Risk 9,820.00 9.059.96 10,150.00 9,255.40 87.82 90.97 -54.03 2.098.01 -2,524.03 5.562 1,105.08 306.82 802.88 Pass-Major Risk 9,820.00 9,059.96 10,175.00 9,277.00 87.82 91.13 -53.03 2,107.30 -2,532.53 5.562 1,120.86 308.93 816.65 Pass-Major Risk 9,820.00 9,059.96 10,195.00 9,294.27 87.82 91.26 -52.26 2,114.73 -2,539.34 5.562 1,13373 310.61 827.85 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 4/28/2014 11:40:12AM Page 6 COMPASS 5000.1 Build 61 NMI BP wales Travelling Cylinder Report 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36-Slot 36 Project: Prudhoe Bay TVD Reference: 57:36 6/12/1995 00:00©64.10usft(generic drilling rig) Reference Site: PB E Pad MD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: E-36 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore E-36B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 4 Offset TVD Reference: Offset Datum Offset Design PB E Pad- E-04-E-04A-E-04A Offset Site Error: 0.00 usft Survey Program: 100-CB-MAG-MS,8347-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +EI-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) 0 (usft) (usft) (in) (usft) (usft) (usft) 9,520.00 8,939.73 8,300.00 7,681.45 29.94 65.01 -9427 1,452.44 -1,805.17 3.812 1,359.73 296.44 1,211.92 Pass-Major Risk 9,531.08 8,943.26 8,325.00 7,703.00 30.43 65.20 -94.47 1,459.50 -1,815.69 3.812 1,34223 299.82 1,192.30 Pass-Major Risk 9,540.00 8,946.22 8,350.00 7,724.45 30.86 65.38 -94.60 1,46671 -1,826.30 3.812 1,324.99 302.63 1,173.40 Pass-Major Risk 9,547.31 8,948.73 8,375.00 7,745.70 31.54 65.44 -95.73 1,473.98 -1,837.30 3.812 1,308.22 304.26 1,155.95 Pass-Major Risk 9,580.00 8,953.25 8,400.00 7,766.62 32.89 65.51 -97.68 1,48125 -1,848.88 3.812 1,292.08 306.88 1,138.56 Pass-Major Risk 9,570.46 8,957.14 8,425.00 7,786.91 34.41 65.58 -99.18 1,488.70 -1,861.45 3.812 1,276.97 310.57 1,122.52 Pass-Major Risk 9,580.00 8,960.79 8,450.00 7,806.27 36.00 65.66 -100,45 1,496.44 -1,875.23 3.812 1,263.25 313.87 1,108.15 Pass-Major Risk 9,594.62 8,966.59 8,475.00 7,824.57 38.92 65.74 -102.44 1,504.44 -1,890.26 3.812 1,251.09 319.77 1,094.86 Pass-Major Risk 9,606.67 8,971.54 8,500.00 7,841.98 41.84 65.84 -103.92 1,512.54 -1,906.26 3.812 1,240.30 324.59 1,083.51 Pass-Major Risk 9,620.00 8,977.17 8,525.00 7,859.13 44.97 65.93 -105.54 1,520.39 -1,922.67 3.812 1,230.15 329.62 1,072.73 Pass-Major Risk 9,629.78 8,981.39 8,550.00 7,876.29 47.50 66.02 -106.55 1,527.97 -1,939.20 3.812 1,220.33 333.20 1,063.04 Pass-Major Risk 9,640.00 8,985.88 8,575.00 7,893.51 50.32 66.12 -107.59 1,535.25 -1,955.80 3.812 1,210.77 336.43 1,053.51 Pass-Major Risk 9,651.95 8,991.21 8,600.00 7,910.80 53.64 66.22 -108.84 1,542.24 -1,972.44 3.812 1,201.47 339.81 1,044.41 Pass-Major Risk 9,667.81 8,998.23 8,625.00 7,928.15 58.05 66.31 -110.62 1,549.10 -1,989.08 3.812 1,192.35 343.96 1,038.77 Pass-Major Risk 9,680.00 9,003.76 8,650.00 7,945.58 61.68 66.41 -111.82 1,556.16 -2,005.55 3.812 1,183.30 346.17 1,028.75 Pass-Major Risk 9,694.33 9,010.13 8,675.00 7,963.08 65.79 66.51 -113.26 1,583.46 -2,021.85 3.812 1,174.34 347.18 1,020.04 Pass-Major Risk 9,705.60 9,015.08 8,700.00 7,980.85 89.09 66.81 -114.17 1,570.98 -2,037.97 3.812 1,165.51 349.08 1,012.25 Pass-Major Risk 9,715.68 9,019.46 8,725.00 7,998.18 72.03 66.71 -114.84 1,578.71 -2,054.02 3.812 1,156.99 349.48 1,003.61 Pass-Major Risk 9,724.72 9,023.35 8,750.00 8,015.59 74.66 66.81 -115.31 1,586.61 -2,070.14 3.812 1,148.97 349.46 994.71 Pass-Major Risk 9,732.84 9,026.80 8,775.00 8,032.85 77.01 66.92 -115.59 1,594.68 -2,086.32 3.812 1,141.47 349.05 985.49 Pass-Major Risk 9,740.00 9,029.80 8,800.00 8,049.99 79.13 87.02 -115.69 1,802.92 -2,102.55 3.812 1,134.52 348.61 976.32 Pass-Major Risk 9,746.70 9,032.58 8,825.00 8,067.18 81.01 87.13 -115.69 1,811.23 -2,118.69 3.812 1,127.91 347.77 966.44 Pass-Major Risk 9,752.67 9,035.03 8,850.00 8,084.51 82.73 67.23 -115.54 1,619.54 -2,134.67 3.812 1,121.55 346.97 956.42 Pass-Major Risk 9,760.00 9,038.00 8,875.00 8,101.97 84.88 87.34 -115.80 1,627.87 -2,150.50 3.812 1,115.48 345.87 945.68 Pass-Major Risk 9,760.00 9,038.00 8,900.00 8,119.57 84.88 67.45 -114.47 1,636.24 -2,166.16 3.812 1,109.65 345.93 937.32 Pass-Major Risk 9,767.50 9,040.98 8,925.00 8,137.31 85.96 67.56 -114.50 1,644.77 -2,181.57 3.812 1,104.06 340.67 927.19 Pass-Major Risk 9,771.51 9,042.56 8,950.00 8,155.19 86.54 87.66 -113.97 1,653.50 -2,196.72 3.812 1,098.72 337.81 917.90 Pass-Major Risk 9,780.00 9,045.84 8,975.00 8,173.19 87.79 67.77 -114.14 1,662.40 -2,211.60 3.812 1,093.65 331.56 907.67 Pass-Major Risk 9,780.00 9,045.84 9,000.00 8,191.26 87.79 87.88 -112.91 1,671.51 -2,228.28 3.812 1,088.90 331.58 899.58 Pass-Major Risk 9,780.00 9,045.84 9,025.00 8,209.20 87.79 67.99 -111.67 1,680.85 -2,240.97 3.812 1,084.81 331.59 892.07 Pass-Major Risk 9,780.00 9,045.84 9,050.00 8,227.00 87.79 88.10 -110.42 1,690.44 -2,255.68 3.812 1,081.43 331.60 885.18 Pass-Major Risk 9,780.00 9,045.84 9,075.00 8,244.65 87.79 88.21 -109.15 1,700.26 -2,270.41 3.812 1,078.75 331.61 878.94 Pass-Major Risk 9,788.57 9,049.08 9,100.00 8,262.27 87.80 68.33 -109.25 1,710.05 -2,285.20 3.812 1,076.61 320.69 873.35 Pass-Major Risk 9,790.75 9,049.89 9,125.00 8,279.94 87.80 88.44 -108.32 1,719.63 -2,300.07 3.812 1,075.09 317.90 868.37 Pass-Major Risk 9,792.86 9,050.67 9,150.00 8,297.65 87.80 68.55 -107.37 1,729.00 -2,315.03 3.812 1,074.14 315.19 864.02 Pass-Major Risk 9,800.00 9,053.28 9,175.00 8,315.38 87.81 88.67 -107.26 1,738.16 -2,330.07 3.812 1,073.83 306.05 880.70 Pass-Major Risk,CC 9,800.00 9,053.28 9,200.00 8,333.00 87.81 68.79 -105.96 1,747.20 -2,345.33 3.812 1,074.24 306.04 857.75 Pass-Major Risk 9,800.00 9,053.28 9,225.00 8,350.46 87.81 88.91 -104.67 1,756.14 -2,360.83 3.812 1,075.50 306.04 855.70 Pass-Major Risk 9,800.00 9,053.28 9,250.00 8,367.76 87.81 69.03 -103.39 1,764.98 -2,376.56 3.812 1,077.61 306.03 854.54 Pass-Major Risk 9,804.93 9,055.02 9,275.00 8,384.95 87.81 69.16 -102.78 1,773.79 -2,392.45 3.812 1,080.46 300.11 854.37 Pass-Major Risk,ES,SF 9,807.96 9,056.06 9,300.00 8,402.17 87.81 89.28 -101.88 1,782.75 -2,408.19 3.812 1,083.75 296.51 854.68 Pass-Major Risk 9,810.55 9,056.93 9,325.00 8,419.45 87.82 89.41 -100.95 1,791.90 -2,423.77 3.812 1,087.46 293.74 855.49 Pass-Major Risk 9,812.77 9,057.68 9,350.00 8,436.78 87.82 69.54 -99.97 1,801.23 -2,439.18 3.812 1,091.59 291.61 856.82 Pass-Major Risk 9,820.00 9,059.96 9,375.00 8,454.09 87.82 69.67 -99.89 1,810.80 -2,454.59 3.812 1,096.32 284.95 859.30 Pass-Major Risk 9,820.00 9,059.96 9,400.00 8,471.27 87.82 69.80 -98.43 1,819.82 -2,470.25 3.812 1,101.79 284.92 862.07 Pass-Major Risk 9,820.00 9,059.96 9,425.00 8,488.30 87.82 69.93 -97.19 1,828.87 -2,486.16 3.812 1,108.04 284.88 885.73 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 4/28/2014 11.40:12AM Page 7 COMPASS 5000.1 Build 61 MktI BP BAKER HUGFES Travelling Cylinder Report 0 bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36-Slot 36 Project: Prudhoe Bay TVD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Reference Site: PB E Pad MD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: E-36 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore E-36B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 4 Offset TVD Reference: Offset Datum Offset Design PB E Pad- E-04-E-04A-E-04A Offset Site Error: 0.00 usft Survey Program: 100-CB-MAG-MS,8347-M5ND Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/-S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) 11 (usft) (usft) (in) (usft) (usft) (usft) 9,820.00 9,059.96 9,450.00 8,505.18 87.82 70.06 -95.97 1,837.75 -2,502.31 3.812 1,115.05 284.84 87026 Pass-Major Risk 9,820.00 9,059.96 9,475.00 8,522.04 87.82 70.20 -94.77 1,846.48 -2,518.58 3.812 1,122.66 284.81 875.50 Pass-Major Risk 9,820.00 9,059.96 9,500.00 8,538.94 87.82 70.33 -93.59 1,855.05 -2,534.89 3.812 1,130.75 28478 881.31 Pass-Major Risk 9,820.00 9,059.96 9,525.00 8,555.88 87.82 70.47 -9242 1,86347 -2,55123 3.812 1,139.29 284.75 887.68 Pass-Major Risk 9,820.00 9,059.96 9,550.00 8,572.88 87.82 70.61 -91.28 1,871.76 -2,567.58 3.812 1,148.28 28472 894.59 Pass-Major Risk 9,827.49 9,062.18 9,575.00 8,589.96 87.83 70.75 -91.16 1,880.23 -2,583.75 3.812 1,157.52 278.24 903.18 Pass-Major Risk 9,828.58 9,062.49 9,600.00 8,607.13 87.83 70.88 -90.19 1,888.94 -2,599.71 3.812 1,167.10 277.30 911.16 Pass-Major Risk 9,829.52 9,062.75 9,625.00 8,624.37 87.83 71.02 -89.20 1,897.88 -2,61544 3.812 1,176.96 276.51 919.51 Pass-Major Risk 9,830.34 9,062.98 9,650.00 8,64166 87.83 71.16 -88.22 1,906.99 -2,631.04 3.812 1,187.18 275.96 928.30 Pass-Major Risk 9,831.11 9,063.19 9,675.00 8,658.84 87.83 71.30 -8725 1,916.10 -2,646.75 3.812 1,197.97 275.57 937.76 Pass-Major Risk 9,831.83 9,063.39 9,700.00 8,675.91 87.83 71.45 -86.30 1,925.20 -2,662.59 3.812 1,209.33 27521 947.90 Pass-Major Risk 9,832.51 9,063.58 9,725.00 8,692.70 87.83 71.60 -85.37 1,934.36 -2,678.68 3.812 1,221.42 274.88 958.86 Pass-Major Risk 9,840.00 9,065.54 9,750.00 8,709.13 87.84 71.75 -85.45 1,943.62 -2,695.09 3.812 1,234.39 270.82 972.65 Pass-Major Risk 9,840.00 9,065.54 9,775.00 8,725.18 87.84 71.90 -8449 1,952.98 -2,711.81 3.812 1,248.06 270.90 985.32 Pass-Major Risk 9,840.00 9,065.54 9,800.00 8,740.89 87.84 72.05 -83.56 1,962.45 -2,728.81 3.812 1,262.45 270.98 998.79 Pass-Major Risk 9,840.00 9,065.54 9,825.00 8,756.54 87.84 7221 -82.65 1,972.07 -2,745.76 3.812 1,277.19 271.07 1,012.67 Pass-Major Risk 9,840.00 9,065.54 9,850.00 8,772.16 87.84 72.37 -81.76 1,981.92 -2,762.61 3.812 1,292.23 271.15 1,026.92 Pass-Major Risk 9,840.00 9,065.54 9,875.00 8,787.71 87.84 72.53 -80.89 1,991.96 -2,779.42 3.812 1,307.61 271.24 1,041.57 Pass-Major Risk 9,840.00 9,065.54 9,900.00 8,803.19 87.84 72.70 -80.04 2,002.22 -2,796.15 3.812 1,323.29 271.34 1,056.59 Pass-Major Risk 9,840.00 9,065.54 9,925.00 8,818.74 87.84 72.86 -7921 2,013.29 -2,81229 3.812 1,338.97 271.44 1,071.63 Pass-Major Risk 9,840.00 9,065.54 9,950.00 8,834.38 87.84 73.02 -78.37 2,025.55 -2,827.46 3.812 1,354.40 271.56 1,086.47 Pass-Major Risk 9,840.00 9,065.54 9,975.00 8,849.96 87.84 73.17 -77.55 2,038.91 -2,841.73 3.812 1,36966 271.69 1,101.18 Pass-Major Risk 9,840.00 9,065.54 10,000.00 8,865.38 87.84 73.33 -76.74 2,053.16 -2,855.29 3.812 1,384.88 271.84 1,115.88 Pass-Major Risk 9,840.00 9,065.54 10,025.00 8,880.64 87.84 7348 -75.95 2,068.18 -2,86820 3.812 1,400.05 272.00 1,130.58 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 4/2872014 11:40:12AM Page 8 COMPASS 5000.1 Build 61 IGLU BP BAKER HUMES Travelling Cylinder Report 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36-Slot 36 Project: Prudhoe Bay TVD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Reference Site: PB E Pad MD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: E-36 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore E-36B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 4 Offset TVD Reference: Offset Datum Offset Design PB E Pad- E-06-E-06-E-06 Offset Site Error: 0.00 usft Survey Program: 100-CB-GYRO-MS Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NI-S •EI-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (esti) (usft) (in) (usft) (usft) (usft) 11,950.00 9,181.71 9,175.00 6664.40 87.63 100.26 -162.20 -1,295.08 -1,396.68 5.562 1,403.50 292.88 1,11241 Pass-Major Risk 11,950.00 9,181.71 9,200.00 8,688.73 8763 100.55 -161.22 -1,29932 -1,400.60 5.562 1,400.19 293.12 1,109.39 Pass-Major Risk 11,950.00 9,181.71 9,22500 8,713.08 8763 100.83 -160.24 -1,303.51 -1,40442 5.562 1,397.23 293.33 1,106.81 Pass-Major Risk 11,950.00 9,181.71 9,250.00 8,737.43 8763 101.10 -159.25 -1,30768 -1,408.19 5.562 1,39466 293.54 1,104.69 Pass-Major Risk 11,950.00 9,181.71 9,275.00 8,761.80 87.63 101.26 -158.26 -1,311.84 -1,411.95 5.562 1,392.52 293.60 1,103.03 Pass-Major Risk 11,960.22 9,184.46 9,300.00 8,786.16 8763 101.41 -158.19 -1,315.99 -1,415.71 5.562 1,390.68 30162 1,092.97 Pass-Major Risk 11,961.88 9,184.90 9,325.00 8,810.53 87.63 101.56 -157.35 -1,320.15 -1,419.46 5.562 1,389.37 30288 1,090.87 Pass-Major Risk 11,963.53 9,185.35 9,350.00 8,834.89 87.63 101.71 -156.50 -1,324.31 -1,423.22 5.562 1,388.51 304.07 1,089.30 Pass-Major Risk 11,965.17 9,185.78 9,375.00 8,85926 87.63 101.86 -15565 -1,32846 -1,426.98 5.562 1,388.10 305.24 1,088.25 Pass-Major Risk,CC 11,975.00 9,188.42 9,400.00 8,883.62 87.63 102.01 -155.54 -1,33262 -1,430.73 5.562 1,388.21 31283 1,080.54 Pass-Major Risk,ES,SF 11,97500 9,188.42 9,425.00 8,907.98 87.63 102.17 -154.54 -1,336.78 -1,434.49 5.562 1,38865 312.86 1,081.79 Pass-Major Risk 11,975.00 9,18842 9450.00 8,932.35 87.63 102.32 -153.54 -1,340.93 -1,438.25 5.562 1,389.53 313.05 1,083.52 Pass-Major Risk 11,975.00 9,18842 9,475.00 8,956.71 87.63 102.47 -152.54 -1,345.09 -1,442.00 5.562 1,390.87 313.30 1,085.75 Pass-Major Risk 11,975.00 9,188.42 9,500.00 8,981.08 87.63 10262 -151.55 -1,34924 -1,445.76 5.562 1,39265 31362 1,088.47 Pass-Major Risk 11,975.00 9,188.42 9,525.00 9,005.44 87.63 102.77 -150.56 -1,353.40 -1,44952 5.562 1,394.88 313.99 1,091.70 Pass-Major Risk 11,975.00 9,18842 9,550.00 9,029.80 87.63 102.93 -149.57 -1,357.56 -1,453.27 5.562 1,397.55 314.42 1,095.44 Pass-Major Risk 11,975.00 9,188.42 9,575.00 9,054.17 87.63 103.08 -148.58 -1,361.71 -1,457.03 5.562 1,400.66 314.91 1,099.71 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 4/28/2014 11:40:12AM Page 9 COMPASS 5000.1 Build 61 /Skill BP BAKER 1 UGHES Travelling Cylinder Report 0 bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36-Slot 36 Project: Prudhoe Bay TVD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Reference Site: PB E Pad MD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: E-36 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore E-36B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 4 Offset ND Reference: Offset Datum Offset Design PB E Pad- E-06-E-06A-E-06A Offset Site Error: 0.00 usft Survey Program: 100-C8-GYRO-MS,9282-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/-S +El-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (in) (usft) (usft) (miff) 11,950.00 9,181.71 9,175.00 8,66440 87.63 10026 -162.20 -1,295.08 -1,39668 3.500 1,403.50 292.71 1,112.58 Pass-Major Risk 11,950.00 9,181.71 9,200.00 8,688.73 87.63 100.55 -16122 -1,299.32 -1,40060 3.500 1,400.19 292.95 1,109.56 Pass-Major Risk 11,950.00 9,181.71 9,225.00 8,713.08 87.63 100.83 -16024 -1,303.51 -1,40442 3.500 1,39723 293.16 1,106.98 Pass-Major Risk 11,950.00 9,181.71 9,250.00 8,737.43 87.63 101.10 -159.25 -1,30768 -1,408.19 3.500 1,394.66 293.36 1,104.87 Pass-Major Risk 11,950.00 9,181.71 9,275.00 8,76163 8763 101.26 -158.26 -1,312.76 -1,411.83 3.500 1,393.24 293.41 1,104.60 Pass-Major Risk,CC 11,960.98 9,184.66 9,300.00 8,78521 87.63 101.30 -158.29 -1,320.35 -1,415.11 3.500 1,394.09 30365 1,096.05 Pass-Major Risk 11,96361 9,185.37 9,325.00 8,807.98 87.63 101.30 -15760 -1,330.25 -1,417.98 3.500 1,397.32 305.71 1,097.91 Pass-Major Risk 11,975.00 9,188.42 9,350.00 8,829.72 87.63 101.30 -157.75 -1,342.34 -1,420.36 3.500 1,402.81 31456 1,09447 Pass-Major Risk,ES,SF CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 4/28/2014 11:40:12AM Page 10 COMPASS 5000.1 Build 61 • Mini BP BAKER HUSHES Travelling Cylinder Report 0 bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36-Slot 36 Project: Prudhoe Bay TVD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Reference Site: PB E Pad MD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: E-36 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore E-36B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 4 Offset ND Reference: Offset Datum Offset Design PB E Pad- E-27-E-27A-E-27A Offset Site Error: 0.00 usft Survey Program: 100-BOSS-GYRO.9427-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +EI_W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) P) (usft) (usft) (in) (usft) (usft) (usft) 10,225.00 9,063.95 10,775.00 9,019.85 87.97 111.79 -115.72 62424 -2.834.15 3.812 1,403.57 230.19 1,175.78 Pass-Major Risk,CC 10,225.00 9,063.95 10,800.00 9,019.84 87.97 111.79 -115.71 646 91 -2,844.68 3.812 1,404.08 230.84 1,175.76 Pass-Major Risk,ES,SF CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 4/28/2014 11:40:12AM Page 11 COMPASS 5000.1 Build 61 • g�11{I INt'� BP s Travelling Cylinder Report 0 bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36-Slot 36 Project: Prudhoe Bay TVD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic i drilling rig) Reference Site: PB E Pad MD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: E-36 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore E-36B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 4 Offset TVD Reference: Offset Datum Offset Design PB E Pad- E-33-E-33-E-33 Offset Site Error: 0.00 usft Survey Program: 204-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Tooiface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NlS +El-W Hole Size Centre Distance Deviation (usff) (usft) (usft) (usft) (soft) (usft) (°I (usft) (usft) (in) (usft) (usft) (usft) 11,525.00 9,094.13 9,050.00 8,285.71 87.71 24.87 -177.68 -847.71 -1,572.87 3.812 1,369.93 228.22 1,162.31 Pass-Major Risk 11,525.00 9,094.13 9,075.00 8,301.96 87.71 25.10 -176.67 -857.29 -1,589.27 3.812 1,374.25 228.46 1,184.88 Pass-Major Risk 11,525.00 9,094.13 9,100.00 8,318.25 87.71 25.34 -175.67 -866.93 -1,605.60 3.812 1,378.99 228.71 1,167.93 Pass-Major Risk 11,525.00 9,094.13 9,125.00 8,334.59 87.71 25.58 -174.67 -876.63 -1,621.84 3.812 1,384.14 228.95 1,171.46 Pass-Major Risk 11,525.00 9,094.13 9,150.00 8,350.98 87.71 25.81 -173.68 -886.34 -1,638.04 3.812 1,389.68 229.19 1,175.44 Pass-Major Risk 11,525.00 9,094.13 9,175.00 8,367.40 87.71 26.04 -172.70 -896.03 -1,654.20 3.812 1,395.60 229.43 1,179.86 Pass-Major Risk 11,525.00 9,094.13 9,200.00 8,383.87 87.71 26.28 -171.73 -905.72 -1,670.33 3.812 1,401.89 229.67 1,184.72 Pass-Major Risk 11,534.05 9,095.14 9,025.00 8,269.50 87.70 24.83 -179.65 -838.18 -1,556.38 3.812 1,365.93 232.52 1,158.49 Pass-Major Risk 11,535.72 9,095.33 9,000.00 8,253.35 87.70 24.40 179.15 -828.65 -1,539.86 3.812 1,362.39 233.11 1,154.21 Pass-Major Risk . 11,537.40 9,095.51 8,975.00 8,237.23 87.70 24.17 177.95 -819.02 -1,523.36 3.812 1,359.21 233.70 1,152.36 Pass-Major Risk 11,539.11 9,095.70 8,950.00 8,221.15 87.70 23.94 176.75 -809.29 -1,506.86 3.812 1,356.40 234.30 1,150.96 Pass-Major Risk 11,540.83 9,095.90 8,925.00 8,205.12 87.70 23.71 175.54 -799.47 -1,490.39 3.812 1,353.95 234.90 1,149.99 Pass-Major Risk 11,550.00 9,096.92 8,725.00 8,077.14 87.70 21.73 166.31 -721.84 -1,357.75 3.812 1,350.79 237.09 1,163.02 Pass-Major Risk 11,550.00 9,096.92 8,750.00 8,093.22 87.70 21.99 167.33 -731.13 -1,374.49 3.812 1,349.33 237.40 1,158.94 Pass-Major Risk 11,550.00 9,096.92 8,775.00 8,109.26 87.70 22.24 168.36 -740.57 -1,391.18 3.812 1,348.42 237.70 1,155.47 Pass-Major Risk 11,550.00 9,096.92 8,800.00 8,125.26 87.70 22.50 169.39 -750.17 -1,407.82 3.812 1,348.09 238.00 1,152.61 Pass-Major Risk,CC 11,550.00 9,096.92 8,825.00 8,141.23 87.70 22.76 170.42 -759.94 -1,424.39 3.812 1,348.32 238.31 1,150.35 Pass-Major Risk 11,550.00 9,096.92 8,850.00 8,157.17 87.70 23.00 171.46 -769.84 -1,440.91 3.812 1,349.10 238.59 1,148.71 Pass-Major Risk 11,550.00 9,096.92 8,875.00 8,173.13 87.70 23.24 172.49 -779.73 -1,457.42 3.812 1,350.32 238.86 1,147.57 Pass-Major Risk 11,550.00 9,096.92 8,900.00 8,189.11 87.70 23.47 173.52 -789.61 -1,473.91 3.812 1,351.97 239.13 1,146.91 Pass-Major Risk,ES,SF 11,559.05 9,097.92 8,700.00 8,061.02 87.89 21.46 164.32 -712.46 -1,341.11 3.812 1,352.65 241.08 1,164.81 Pass-Major Risk 11,561.34 9,098.17 8,875.00 8,044.84 87.69 21.19 163.05 -702.91 -1,324.62 3.812 1,354.99 241.83 1,169.24 Pass-Major Risk 11,563.61 9,098.43 8,650.00 8,028.61 87.69 20.92 161.79 -693.20 -1,308.26 3.812 1,357.76 242.56 1,174.17 Pass-Major Risk 11,565.89 9,098.68 8,625.00 8,012.32 87.69 20.66 160.53 -683.39 -1,292.03 3.812 1,361.00 243.31 1,179.62 Pass-Major Risk 11,575.00 9,099.68 8,500.00 7,929.74 87.69 19.47 154.61 -635.09 -1,211.58 3.812 1,385.21 246.04 1,216.05 Pass-Major Risk 11,575.00 9,099.68 8,525.00 7,946.30 87.69 19.69 155.58 -644.84 -1,227.58 3.812 1,379.50 246.31 1,207.41 Pass-Major Risk 11,575.00 9,099.68 8,550.00 7,962.90 87.69 19.92 156.56 -654.43 -1,243.62 3.812 1,374.12 246.58 1,199.10 Pass-Major Risk 11,575.00 9,099.68 8,575.00 7,979.47 87.69 20.16 157.55 -663.99 -1,259.71 3.812 1,369.20 246.89 1,191.23 Pass-Major Risk 11,575.00 9,099.68 8,800.00 7,995.94 87.69 20.41 158.55 -673.65 -1,275.85 3.812 1,364.85 24721 1,183.95 Pass-Major Risk 11,580.71 9,100.31 8,475.00 7,913.23 87.89 19.25 153.03 -625.18 -1,195.64 3.812 1,391.21 248.34 1,223.72 Pass-Major Risk 11,583.30 9,100.60 8,450.00 7,896.77 87.69 19.03 151.79 -615.11 -1,179.75 3.812 1,397.51 249.22 1,232.47 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 4/28/2014 11.40:12AM Page 12 COMPASS 5000.1 Build 61 BAKER BP HUGHES Travelling Cylinder Report 0 bp IN'II.Q Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36-Slot 36 Project: Prudhoe Bay TVD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(genetic drilling rig) Reference Site: PB E Pad MD Reference: 57:36 6/12/1995 00:00(41 64.10usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: E-36 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore E-36B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 4 Offset TVD Reference: Offset Datum Offset Design PB E Pad- E-33-E-33A-E-33A Offset Site Error: 0.00 usft Survey Program: 204-MWD,9994-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) P) (usft) (usft) (in) (usft) (usft) (usft) 11,525.00 9,094.13 9,050.00 8,285.71 87.71 25.20 -177.68 -847.71 -1,572.87 3.812 1,369.93 228.42 1,162.14 Pass-Major Risk 11,525.00 9,094.13 9,075.00 8,301.96 87.71 25.44 -176.67 -857.29 -1,58927 3.812 1,374.25 228.66 1,164.71 Pass-Major Risk 11,525.00 9,094.13 9,100.00 8,318.25 87.71 25.68 -175.87 -866.93 -1,605.60 3.812 1,378.99 228.91 1,167.76 Pass-Major Risk 11,525.00 9,094.13 9,125.00 8,334.59 87.71 25.92 -174.67 -876.63 -1,621.84 3.812 1,384.14 229.18 1,171.28 Pass-Major Risk 11,525.00 9,094.13 9,150.00 8,350.98 87.71 26.16 -173.68 -886.34 -1,838.04 3.812 1,389.68 22940 1,175.26 Pass-Major Risk 11,525.00 9,094.13 9,175.00 8,367.40 87.71 26.40 -172.70 -896.03 -1,654.20 3.812 1,395.60 229.64 1,179.67 Pass-Major Risk 11,525.00 9,094.13 9,200.00 8,383.87 87.71 26.63 -171.73 -905.72 -1,670.33 3.812 1,401.89 229.88 1,184.53 Pass-Major Risk 11,534.05 9,095.14 9,025.00 8,269.50 87.70 24.96 -179.65 -838.18 -1,556.38 3.812 1,365.93 232.74 1,156.31 Pass-Major Risk 11,535.72 9,095.33 9,000.00 8,253.35 87.70 24.72 179.15 -828.85 -1,539.86 3.812 1,362.39 233.32 1,154.04 Pass-Major Risk 11,537.40 9,095.51 8,975.00 8,237.23 87.70 24.49 177.95 -819.02 -1,523.36 3.812 1,359.21 233.91 1,152.19 Pass-Major Risk 11,539.11 9,095.70 8,950.00 8,221.15 87.70 24.25 176.75 -809.29 -1,506.86 3.812 1,356.40 234.51 1,150.79 Pass-Major Risk 11,540.83 9,095.90 8925.00 8,205.12 87.70 24.02 175.54 -799.47 -1,490.39 3.812 1,353.95 235.11 1,149.83 Pass-Major Risk 11,550.00 9,096.92 8,725.00 8,077.14 87.70 22.01 166.31 -721.84 -1,357.75 3.812 1,350.79 237.29 1,162.89 Pass-Major Risk 11,550.00 9,096.92 8,750.00 8,093.22 87.70 22.27 167.33 -731.13 -1,374.49 3.812 1,349.33 237.60 1,158.80 Pass-Major Risk 11,550.00 9,096.92 8,775.00 8,109.26 87.70 22.53 168.36 -740.57 -1,391.18 3.812 1,348.42 237.90 1,155.33 Pass-Major Risk 11,550.00 9,096.92 8,800.00 8,125.26 87.70 22.79 169.39 -750.17 -1,407.82 3.812 1,348.09 238.21 1,152,48 Pass-Major Risk,CC 11,550.00 9,096.92 8,825.00 8,141.23 87.70 23.05 170.42 -759.94 -1,424.39 3.812 1,348.32 238.52 1,150.20 Pass-Major Risk 1 11,550.00 9,096.92 8,850.00 8,157.17 87.70 23.30 171.46 -769.84 -1,440.91 3.812 1,349.10 238.80 1,148.55 Pass-Major Risk 11,550,00 9,096.92 8,875.00 8,173.13 87.70 23.54 172.49 -77973 -1,457.42 3.812 1,350.32 239.07 1,147.40 Pass-Major Risk 11,550.00 9,098.92 8,900.00 8,189.11 87.70 23.78 173.52 -789.81 -1,473.91 3.812 1,351.97 239.35 1,148.74 Pass-Major Risk,ES,SF 11,559.05 9,097.92 8,700.00 8,061.02 87.69 21.73 164.32 -712.46 -1,341.11 3.812 1,352.65 241.28 1,164.67 Pass-Major Risk 11,561.34 9,098.17 8,675.00 8,044.84 87.89 21.46 163.05 -702.91 -1,324.62 3.812 1,354.99 242.04 1,189.10 Pass-Major Risk 11,563.81 9,098.43 8,650.00 8,028.61 87.69 21.19 161.79 -693.20 -1,308.26 3.812 1,357.76 242.77 1,174.04 Pass-Major Risk 11,565.89 9,098.68 8,625.00 8,012.32 87.69 20.93 160.53 -683.39 -1,292.03 3.812 1,361.00 243.52 1,179.49 Pass-Major Risk 11,575.00 9,099.68 8,500.00 7,929.74 87.89 19.72 154.61 -635.09 -1,211.58 3.812 1,385.21 246.24 1,215.94 Pass-Major Risk 11,575.00 9,099.68 8,525.00 7,946.30 87.69 19.94 155.58 -644.84 -1,227.58 3.812 1,379.50 246.51 1,207.29 Pass-Major Risk 11,575.00 9,099.68 8,550.00 7,962.90 87.89 20.17 156.56 -854.43 -1,243.62 3.812 1,374.12 246.79 1,198.98 Pass-Major Risk 11,575.00 9,099.68 8,575.00 7,979.47 87.69 20.42 157.55 -663.99 -1,259.71 3.812 1,369.20 247.11 1,191.10 Pass-Major Risk 11,575.00 9,099.68 8,600.00 7,995.94 87.69 20.68 158.55 -673.65 -1,275.85 3.812 1,364.85 247.42 1,183.82 Pass-Major Risk 11,580.71 9,100.31 8,475.00 7,913.23 87.89 19.50 153.03 -625.18 -1,195.64 3.812 1,391.21 248.55 1,223.61 Pass-Major Risk 11,583.30 9,100.60 8,450.00 7,896.77 87.69 19.27 151.79 -615.11 -1,179.75 3.812 1,397.51 249.43 1,232.36 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 4/28/2014 11:40:12AM Page 13 COMPASS 5000.1 Build 61 Mai BP BAKER MOONIS Travelling Cylinder Report 0 bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36-Slot 36 Project: Prudhoe Bay TVD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Reference Site: PB E Pad MD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: E-36 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore E-36B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 4 Offset ND Reference: Offset Datum Offset Design PB E Pad- E-33-E-33B-E-33B Offset Site Error: 0.00 usft Survey Program: 204-MWD,9704-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NtS +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (in) (usft) (usft) (usft) 11,525.00 9,094.13 9,050.00 8,285.71 87.71 25.53 -177.68 -847.71 -1,572.87 3812 1.369.93 228.61 1,161.97 Pass-Major Risk 11525.00 9,094.13 9,075.00 8,301.96 87.71 25.77 -176.67 -857.29 -1,589.27 3.812 1,374.25 228.86 1,164.54 Pass-Major Risk 11,525.00 9,094.13 9,100.00 8,318.25 87.71 26.02 -175.67 -866.93 -1,605.60 3.812 1,378.99 229.11 1,167.58 Pass-Major Risk 11,525.00 9,094.13 9,125.00 8,334.59 87.71 26.26 -174.67 -876.63 -1,621.84 3.812 1,384.14 229.36 1,171.10 Pass-Major Risk 11,525.00 9,094.13 9,150.00 8,350.98 87.71 26.50 -173.88 -886.34 -1,838.04 3.812 1,389.68 229.61 1,175.07 Pass-Major Risk 11,525.00 9,094.13 9,175.00 8,367.40 87.71 26.75 -172.70 -896.03 -1,654.20 3.812 1,395.60 229.85 1,179.49 Pass-Major Risk 11,525.00 9,094.13 9,200.00 8,383.87 87.71 26.99 -171.73 -905.72 -1,870.33 3.812 1,401.89 230.10 1,184-33 Pass-Major Risk 11,534.05 9,095.14 9,025.00 8,269.50 87.70 25.28 -179.65 -838.18 -1,556.38 3.812 1,365.93 232.94 1,156.14 Pass-Major Risk 11,535.72 9,095.33 9,000.00 8,253.35 87.70 25.04 179.15 -828.65 -1,539.86 3.812 1,362.39 233.53 1,153.87 Pass-Major Risk 11,537.40 9,095.51 8,975.00 8,237.23 87.70 24.81 177.95 -819.02 -1,523.36 3.812 1,359.21 234.12 1,152.03 Pass-Major Risk 11,539.11 9,095.70 8,950.00 8,221.15 87.70 24.57 176.75 -809.29 -1,506.86 3.812 1,356.40 234.71 1,150.63 Pass-Major Risk 11,540.83 9,095.90 8,925.00 8,205.12 87.70 24.33 175.54 -799.47 -1,490.39 3.812 1,353.95 235.31 1,149.67 Pass-Major Risk 11,550.00 9,098.92 8,725.00 8,077.14 87.70 22.28 166.31 -721.84 -1,357.75 3.812 1,350.79 237.48 1,162.75 Pass-Major Risk 11,550.00 9,096.92 8,750.00 8,093.22 87.70 22.55 167.33 -731.13 -1,374.49 3.812 1,349.33 237.79 1,158.67 Pass-Major Risk 11,550.00 9,096.92 8,775.00 8,109.26 87.70 22.81 168.36 -740.57 -1,391.18 3.812 1,348.42 238.10 1,155.19 Pass-Major Risk 11,550.00 9,096.92 8,800.00 8,125.26 87.70 23.08 169.39 -750.17 -1,407.82 3.812 1,348.09 238.41 1,152.31 Pass-Major Risk,CC 11,550.00 9,096.92 8,825.00 8,141.23 87.70 23.34 170.42 -759.94 -1,424.39 3.812 1,348.32 238.72 1,150.05 Pass-Major Risk 11,550.00 9,096.92 8,850.00 8,157.17 87.70 23.59 171.46 -769.84 -1,440.91 3.812 1,349.10 239.01 1,148.40 Pass-Major Risk 11,550.00 9,096.92 8,875.00 8,173.13 87.70 23.84 172.49 -779.73 -1,457.42 3.812 1,350.32 239.29 1,147.25 Pass-Major Risk 11,550.00 9,096.92 8,900.00 8,189.11 87.70 24.08 173.52 -789.61 -1,473.91 3.812 1,351.97 239.56 1,146.58 Pass-Major Risk,ES,SF 11,559.05 9,097.92 8,700.00 8,061.02 87.69 22.01 164.32 -712.46 -1,341.11 3.812 1,352.65 241.49 1,164.54 Pass-Major Risk 11,561.34 9,098.17 8,675.00 8,044.84 87.69 21.73 163.05 -702.91 -1,324.62 3.812 1,354.99 24224 1,168.97 Pass-Major Risk 11,56361 9,098.43 8,650.00 8,028.61 87.69 21.45 161.79 -693.20 -1,308.26 3.812 1,357.76 242.97 1,173.91 Pass-Major Risk 11,565.89 9,098.68 8,625.00 8,012.32 87.69 21.19 160.53 -683.39 -1,292.03 3.812 1,361.00 243.72 1,179.37 Pass-Major Risk 11,575.00 9,099.68 8,500.00 7,929.74 87.69 19.96 154.61 -635.09 -1,211.58 3.812 1,385.21 246.44 1,215.84 Pass-Major Risk 11,575.00 9,099.68 8,525.00 7,946.30 87.69 20.19 155.58 -644.84 -1,227.58 3.812 1,379.50 246.71 1,207.18 Pass-Major Risk 11,575.00 9,099.68 8,550.00 7,962.90 87.69 20.42 156.56 -654.43 -1,243.62 3.812 1,374.12 246.99 1,198.86 Pass-Major Risk - 11,575.00 9,099.68 8,575.00 7,979.47 87.69 20.68 157.55 -663.99 -1,259.71 3.812 1,369.20 247.31 1,190.98 Pass-Major Risk 11,575-00 9,099.68 8,600.00 7,995.94 87.69 20.94 158.55 -673.65 -1,275.85 3-812 1,384.85 247.63 1,183.69 Pass-Major Risk 11,580.71 9,100.31 8,475.00 7,913.23 87.89 19.73 153.03 -625.18 -1,195.64 3.812 1,391.21 248.75 1,223.50 Pass-Major Risk 11,583.30 9,100.80 8,450.00 7,898.77 87.69 19.50 151.79 -615.11 -1,179.75 3.812 1,397.51 249.62 1,232.26 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 4/28/2014 11:40:12AM Page 14 COMPASS 5000.1 Build 61 Will BP BILICIllt HUGHES Travelling Cylinder Reportby INTEQ *. Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36-Slot 36 Project: Prudhoe Bay TVD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Reference Site: PB E Pad MD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: E-36 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore E-36B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 4 Offset ND Reference: Offset Datum Offset Design PB E Pad- E-35-E-35A-E-35A Offset Site Error: 0.00 usft Survey Program: 302-MWD,9123-MWD Rule Assigned:NOERRORS Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (in) (usft) (use) (usft) 11,289.18 9,070.74 10,501.00 9,061.40 87.78 14.20 61.25 525.47 -659.89 7.437 522.49 4.66 517.87 Pass-NOERRORS 11,289.36 9,070.75 10,500.00 9,061.47 87.78 14.20 61.27 524.69 -660.51 7.437 521.56 4.35 517.25 Pass-NOERRORS 11,300.00 9,071.49 10,425.00 9,066.33 87.78 14.44 62.20 465.52 -706.31 7.437 452.80 8.46 452.18 Pass-NOERRORS 11,300.00 9,071.49 10,450.00 9,065.06 87.78 14.28 62.22 485.55 -691.42 7.437 475.41 8.50 474.79 Pass-NOERRORS 11,300.00 9,071.49 10,475.00 9,063.30 87.78 14.20 62.30 505.15 -676.00 7.437 498.49 4.63 497.87 Pass-NOERRORS 11,310.64 9,072.31 10,400.00 9,067.01 87.78 14.59 63.39 444.99 -720.57 7.437 430.57 8.52 429.95 Pass-NOERRORS 11,320.00 9,073.10 10,375.00 9,066.80 87.77 14.74 64.59 423.80 -733.81 7.437 409.17 8.57 408.55 Pass-NOERRORS 11,370.91 9,077.76 10,350.00 9,065.65 87.76 14.88 59.45 401.91 -745.83 7.437 388.18 8.48 387.56 Pass-NOERRORS 11,424.20 9,083.10 10,325.00 9,064.73 87.75 15.01 54.14 379.56 -757.00 7.437 366.14 8.33 365.53 Pass-NOERRORS 11,462.82 9,08721 10,300.00 9,06429 87.73 15.15 50.46 356.83 -767.38 7.437 343.47 8.16 342.85 Pass-NOERRORS 11,492.86 9,090.53 10,275.00 9,063.60 87.72 15.28 47.86 333.72 -776.89 7.437 320.54 8.00 319.92 Pass-NOERRORS 11,517.71 9,093.32 10,250.00 9,062.85 87.71 15.41 45.94 310.27 -785.52 7.437 297.49 7.84 296.87 Pass-NOERRORS 11,538.97 9,095.69 10,225.00 9,063.32 87.70 15.53 44.29 286.55 -793.40 7.437 274.24 7.69 273.62 Pass-NOERRORS 11,558.22 9,097.83 10,200.00 9,064.81 87.70 15.65 42.78 262.55 -800.21 7.437 250.95 7.55 250.33 Pass-NOERRORS 11,575.99 9,099.79 10,175.00 9,066.57 87.69 15.77 41.50 238.27 -805.90 7.437 227.74 7.41 227.12 Pass-NOERRORS 11,590.00 9,101.33 10,150.00 9,067.57 87.68 15.88 41.00 213.64 -809.98 7.437 204.97 7.30 204.35 Pass-NOERRORS 11,600.00 9,102.47 10,125.00 9,067.79 87.68 15.96 43.51 188.70 -811.57 7.437 183.49 7.48 182.87 Pass-NOERRORS 11,610.20 9,103.71 10,100,00 9,068.39 87.68 16.03 46.31 163.74 -810.61 7.437 163.70 7.67 163.08 Pass-NOERRORS 11,625.00 9,105.65 10,075.00 9,069.38 87.67 16.06 49.84 139.00 -807.18 7.437 145.98 7.98 145.36 Pass-NOERRORS 11,637.39 9,107.42 10,050.00 9,070.57 87.67 16.09 53.50 114.71 -801.45 7.437 130.55 8.24 129.93 Pass-NOERRORS 11,653.70 9,109.91 10,025.00 9,071.95 87.66 16.10 57.90 91.00 -793.64 7.437 117.71 8.58 117.09 Pass-NOERRORS 11,671.29 9,112.83 10,000.00 9,073.41 87.66 16.09 62.84 67.80 -784.45. 7.437 107.14 8.94 106.52 Pass-NOERRORS 11,689.93 9,116.18 9,975.00 9,075.16 87.66 16.07 68.13 45.08 -774.18 7.437 98.70 9.33 98.08 Pass-NOERRORS 15,709.45 9,119.96 9,950.00 9,077.44 87.65 16.05 73.50 22.82 -763.04 7.437 92.20 9.72 91.58 Pass-NOERRORS 11,729.86 9,124.21 9,925.00 9,079.89 87.65 16.00 78.60 1.55 -750.15 7.437 88.68 10.12 88.06 Pass-NOERRORS,CC,ES,SI 11,750.00 9,128.68 9,900.00 9,081.30 87.65 15.92 83.40 -18.35 -735.12 7.437 89.18 10.52 88.56 Pass-NOERRORS 11,770.96 9,133.63 9,875.00 9,080.53 87.64 15.83 88.24 -36.88 -718.37 7.437 93.95 10.91 93.33 Pass-NOERRORS 11,790.38 9,138.48 9,850.00 9,078.01 87.64 15.72 92.62 -54.26 -700.59 7.437 102.09 11.28 101.47 Pass-NOERRORS 11,808.60 9,143.24 9,825.00 9,074.11 8764 15.58 96.23 -70.28 -681.81 7.437 113.25 11.81 112.63 Pass-NOERRORS 11,830.93 9,14929 9,800.00 9,068.97 87.64 15.46 96.80 -84.78 -662.11 7.437 126.81 1179 126.19 Pass-NOERRORS 11,858.14 9,156.16 9,775.00 9,062.77 87.64 15.31 95.83 -97.89 -641.75 7.437 ' 141.31 11.86 140.69 Pass-NOERRORS 11,881.16 9,162.99 9,750.00 9,055.48 87.63 15.15 94.82 -109.69 -620.96 7.437 158.56 11.92 155.94 Pass-NOERRORS 11,905.60 9,169.66 9,725.00 9,046.82 87.63 14.98 93.80 -119.86 -599.84 7.437 172.85 11.96 172.23 Pass-NOERRORS 11,929.35 9,176.12 9,700.00 9,036.99 8763 14.81 92.64 -128.11 -578.40 7.437 190.24 11.97 189.62 Pass-NOERRORS 11,952.34 9,182.34 9,675.00 9,026.04 87.63 14.82 91.35 -134.36 -556.82 7.437 208.69 11.96 208.07 Pass-NOERRORS 11,974.28 9,188.22 9,650.00 9,013.83 87.63 14.43 90.00 -138.56 -535.43 7.437 228.22 11.91 227.60 Pass-NOERRORS 11,994.43 9,193.58 9,625.00 8,999.83 87.63 14.24 88.80 -140.86 -514.85 7.437 248.97 11.85 248.35 Pass-NOERRORS 12,012.41 9,198.31 9,600.00 8,984.16 87.63 14.05 87.75 -141.26 -495.40 7.437 270.85 11.79 270.23 Pass-NOERRORS 12,027.94 9,202.36 9,575.00 8,967.00 87.63 13.87 86.86 -139.84 -477.28 7.437 293.71 11.74 293.09 Pass-NOERRORS 12,041.66 9,205.89 9,550.00 8,948.55 87.63 13.70 86.19 -137.69 -460.56 7.437 317.09 11.87 316.47 Pass-NOERRORS 12,052.87 9,208.75 9,525.00 8,928.89 87.63 13.53 85.74 -134.58 -445.45 7.437 340.99 11.61 340.37 Pass-NOERRORS 12,081.42 9,210.92 9,500.00 8,908.46 87.63 13.37 85.42 -130.14 -431.75 7.437 365.37 11.57 364.75 Pass-NOERRORS 12,070.13 9,213.11 9,475.00 8,888.43 87.63 13.20- 84.84 -124.36 -417.96 7.437 389.90 11.53 389.28 Pass-NOERRORS • CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 4/28/2014 11:40::12AM Page 15 COMPASS 5000.1 Build 61 • WIWI BP SAUCER HUGHES Travelling Cylinder Report 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36-Slot 36 Project: Prudhoe Bay TVD Reference: 57:36 6/12/1995 00:00 ii 64.10usft(generic drilling rig) Reference Site: PB E Pad MD Reference: 57:36 6/12/1995 00:00 c 64.10usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: E-36 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore E-36B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 4 Offset TVD Reference: Offset Datum Offset Design PB E Pad- E-35-E-35PB1-E-35PB1 Offset Site Error: 0.00 usft Survey Program: 302-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/.-S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (in) (usft) (usft) (usft) 11,986.07 9,191.36 9,975.00 8,861.73 87.63 19.61 167.94 -533.49 -755.84 3.500 464.58 238.59 249.37 Pass-Major Risk 11,986.09 9,191.37 9,950.00 8,857.32 87.63 19.32 165.25 -514.22 -740.53 3.500 451.90 238.47 241.46 Pass-Major Risk 11,986.09 9,191.37 10,000.00 8,866.15 87.63 19.91 170.49 -552.80 -771.09 3.500 478.25 238.73 258.85 Pass-Major Risk 11,986.20 9,191.40 9,925.00 8,852.83 87.63 19.04 162.39 -495.06 -725.11 3.500 440.38 238.39 235.36 Pass-Major Risk 11,986.28 9,191.42 10,025.00 8,870.64 87.63 2020 172.87 -572.26 -786.12 3.500 492.80 238.93 269.73 Pass-Major Risk 11,986.51 9,191.48 9,900.00 8,848.86 87.63 18.76 159.39 -475.93 -709.52 3.500 429.58 238.40 230.57 Pass-Major Risk 11,986.60 9,191.51 10,050.00 8,875.20 87.63 20.37 175.10 -591.87 -800.95 3.500 508.16 243.31 278.87 Pass-Major Risk 11,986.90 9,191.59 10,075.00 8,879.75 87.63 20.52 177.19 -611.48 -815.77 3.500 524.27 248.23 288.49 Pass-Major Risk 11,987.05 9,19162 10,088.00 8,882.12 87.63 20.60 17823 -621.67 -823.48 3.500 532.92 250.80 293.80 Pass-Major Risk 11,987.26 9,191.68 9,875.00 8,845.38 87.63 18.49 156.23 -457.03 -693.53 3.500 419.68 238.58 227.28 Pass-Major Risk 11,988.46 9,192.00 9,850.00 8,842.18 87.63 18.20 152.89 -438.41 -677.16 3.500 410.93 238.93 225.82 Pass-Major Risk,ES,SF 11,989.75 9,192.34 9,825.00 8,839.04 87.63 17.90 149.43 -419.77 -660.80 3.500 403.46 239.30 226.44 Pass-Major Risk 11,991.26 9,192.74 9,800.00 8,835.69 87.63 17.59 145.82 -401.28 -644.30 3.500 397.70 239.85 229.50 Pass-Major Risk 11,992.95 9,193.19 9,775.00 8,832.25 87.63 17.29 142.11 -382.87 -627.75 3.500 393,54 240.40 234.85 Pass-Major Risk 11,994.74 9,193.66 9,750.00 8,828.79 87.63 16.98 138.32 -364.42 -611.24 3.500 390.92 240.98 242.32 Pass-Major Risk 11,996.72 9,194.18 9,725.00 8,825.30 87.63 16.68 134.49 -345.98 -594.72 3.500 389.93 241.63 251.55 Pass-Major Risk,CC 11,999.11 9,194.82 9,700.00 8,821.79 87.63 16.39 130.62 -327.71 -578.02 3.500 390.61 242.47 262.23 Pass-Major Risk 12,001.67 9,195.49 9,675.00 8,818.30 87.63 16.09 126.76 -309.38 -561.39 3.500 392.82 243.35 274.45 Pass-Major Risk 12,004.54 9,196.25 9,650.00 8,814.79 87.63 15.76 122.94 -291.07 -544.73 3.500 396.61 244.34 287.96 Pass-Major Risk 12,007.67 9,197.07 9,625.00 8,811.18 87.83 15.45 119.17 -272.74 -528.12 3.500 401.98 245.43 302.38 Pass-Major Risk 12,011.09 9,197.97 9,600.00 8,807.45 87.63 15.15 115.49 -254.39 -511.55 3.500 408.89 246.65 317.13 Pass-Major Risk 12,015.32 9,199.07 9,575.00 8,803.77 87.83 14.88 111.88 -236.22 -494.78 3.500 417.18 247.81 331.43 Pass-Major Risk 12,020.63 9,200.46 9,550.00 8,800.48 87.63 14.62 108.27 -218.18 -477.78 3.500 426.43 249.44 34426 Pass-Major Risk 12,026.90 9,202.08 9,525.00 8,797.73 87.63 14.36 104.70 -200.05 -460.79 3.500 436.37 251.75 354.90 Pass-Major Risk 12,034.74 9,204.11 9,500.00 8,795.47 87.63 14.08 101.12 -182.04 -443.81 3.500 447.02 254.78 383.48 Pass-Major Risk 12,044.90 9,206.72 9,475.00 8,793.55 87.63 13.81 97.48 -184.32 -426.07 3.500 458.46 258.66 370.58 Pass-Major Risk 12,058.84 9,209.71 9,450.00 8,791.78 87.63 13.54 93.83 -146.41 -408.72 3.500 470.64 263.03 376.75 Pass-Major Risk 12,071.27 9,213.39 9,425.00 8,790.31 87.63 13.26 9005 -128.56 -391.28 3.500 483.38 268.31 382.14 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 4/28/2014 11:40-12AM Page 16 COMPASS 5000.1 Build 61 • RUM BP BAKER HUGHES Travelling Cylinder Report 0 bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36-Slot 36 Project: Prudhoe Bay TVD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Reference Site: PB E Pad MD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: E-36 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore E-36B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 4 Offset TVD Reference: Offset Datum Offset Design PB E Pad- E-36-E-36-E-36 Offset Site Error: 0.00 usft Survey Program: 152-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NI-S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) P) (usft) (usft) (in) (use) (usft) (usft) 9,514.07 8,937.89 9,550.00 8,984.34 2.52 4.11 45.69 1,768.13 -1,301.54 3.812 85.64 20.60 66.71 Pass-Major Risk,CC,ES,SF 9,532.66 8,943.77 9,575.00 8,996.98 3.75 4.47 43.15 1,784.43 -1,315.67 3.812 100.73 25.47 77.52 Pass-Major Risk 9,54972 8,949.57 9,600.00 9,009.01 6.45 4.83 39.69 1,801.03 -1,329.97 3.812 115.88 34.15 84.99 Pass-Major Risk 9,563.86 8,954.67 9,625.00 9,020.31 9.55 5.20 35.33 1,817.91 -1,344.54 3.812 131.62 43.74 91.95 Pass-Major Risk 9,576.75 8,959.54 9,650.00 9,030.88 12.93 5.57 31.02 1,835.06 -1,359.35 3.812 148.06 54.09 98.60 Pass-Major Risk 9,58822 8,964.03 9,675.00 9,040.51 16.19 5.95 26.83 1,852.75 -1,374.15 3.812 165.37 63.97 10620 Pass-Major Risk 9,600.00 8,968.79 9,700.00 9,049.44 19.65 6.33 22.65 1,870.64 -1,389.16 3.812 183.33 7420 113.91 Pass-Major Risk 9,607.78 8,972.00 9,725.00 9,057.77 22.03 6.71 1923 1,888.70 -1,404.29 3.812 201.91 81.31 124.92 Pass-Major Risk 9,620.00 8,977.17 9,750.00 9,065.41 25.78 7.09 15.26 1,907.23 -1,41924 3.812 221.40 91.77 133.69 Pass-Major Risk 9,620.00 8,977.17 9,775.00 9,072.62 25.78 7.47 13.33 1,925.82 -1,434.32 3.812 24127 92.32 152.06 Pass-Major Risk 9,629.67 8,981.34 9,800.00 9,079.72 28.77 7.86 10.14 1,94439 -1,449.48 3.812 261.63 100.41 163.95 Pass-Major Risk 9,640.00 8,985.88 9,825.00 9,086.81 31.97 8.25 7.07 1,962.95 -1,464.65 3.812 282.56 108.53 176.35 Pass-Major Risk 9,640.00 8,985.88 9,850.00 9,093.91 31.97 8.64 5.75 1,981.52 -1,479.81 3.812 303.76 108.99 196.50 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 4/28/2014 11:40.:12AM Page 17 COMPASS 5000.1 Build 61 MLS BP sAICER HYGI$ Travelling Cylinder Report 0 bp 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36-Slot 36 Project: Prudhoe Bay TVD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Reference Site: PB E Pad MD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: E-36 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore E-36B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 4 Offset TVD Reference: Offset Datum Offset Design PB E Pad- E-36-E-36A-E-36A Offset Site Error: 0 00 usft Survey Program: 152-MWD,9224-MWD Rule Assigned:NOERRORS Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +E/-1A/ Hole Size Centre Distance Deviation (soft) (usft) (usft) (soft) (usft) (usft) Ci lust-) (usft) lin) (soft) (usft) (usft) 9,506.00 8,935.36 10,825.00 9,064.18 0.00 9.06 21.67 2,527.21 -1,092.28 3.812 867.82 2.67 865.17 Pass-NOERRORS 9,511.48 8,937.08 10,800.00 9,063.90 0.09 9.07 20.36 2,528.41 -1,117.24 3.812 862.57 2.52 860.07 Pass-NOERRORS 9,520.00 8,939.73 10,775.00 9,064.11 0.24 9.08 18.61 2,528.34 -1,142.24 3.812 856.73 2.36 854.39 Pass-NOERRORS 9,525.00 8,941.30 9,525.00 8,941.28 0.79 0.20 -143.07 1,703.71 -1,340.03 3.812 0.04 0.51 -0.28 FAIL-NOERRORS,CC,ES,SF 9,529.15 8,942.63 10,750.00 9,065.53 1.24 9.08 18.04 2,527.40 -1,167.18 3.812 850.70 2.23 848.47 Pass-NOERRORS 9,540.00 8,946.22 10,725.00 9,067.13 2.43 9.07 17.42 2,525.35 -1,192.04 3.812 843.91 2.11 841.79 Pass-NOERRORS 9,547.73 8,948.87 10,700.00 9,068.63 4.03 9.04 15.76 2,521.72 -1,216.72 '3.812 836.05 1.98 834.06 Pass-NOERRORS 9,549.99 8,949.66 9,550.00 8,948.92 4 49 0.47 -130.81 1,706.43 -1,363.67 3.812 1.17 0.62 0.85 Pass-NOERRORS 9,560.00 8,95325 10,625.00 9,069.02 6.56 8.91 12.28 2,504.46 -1,289.62 3.812 809.01 1.66 807.36 Pass-NOERRORS 9,560.00 8,953.25 10,650.00 9,070.08 6.56 8.95 12.86 2,510.93 -1,265.50 3.812 818.34 1.75 816.59 Pass-NOERRORS 9,560.00 8,953.25 10,675.00 9,069.90 6.56 9.00 13.37 2,516.53 -1,241.14 3.812 827.33 1.84 825.49 Pass-NOERRORS 9,568.72 8,956.48 10,600.00 9,067.42 8.86 8.85 10.24 2,496.72 -1,313.34 3.812 798.86 1.54 797.33 Pass-NOERRORS 9,574.75 8,958.77 9,575.00 8,956.58 10.45 0.74 -56.62 1,710.11 -1,387.18 3.812 2.83 0.73 2.40 Pass-NOERRORS . 9,580.00 8,960.79 10,525.00 9,062.34 11.83 8.58 6.57 2,464.09 -1,380.55 3.812 762.45 1.34 761.18 Pass-NOERRORS 9,580.00 8,960.79 10,550.00 9,063.79 11.83 8.68 7.18 2,476.30 -1,358.79 3.812 775.35 1.38 774.02 Pass-NOERRORS 9,580.00 8,960.79 10,575.00 9,065.85 11.83 8.77 7.82 2,487.36 -1,336.45 3.812 787.78 1.43 786.38 Pass-NOERRORS 9,588.44 8,964.12 10,500.00 9,061.69 14.31 8.48 4.66 2,451.21 -1,401.96 3.812 749.41 1.27 748.25 Pass-NOERRORS 9,597.93 8,967.94 9,600.00 8,963.83 17.10 1.02 -32.61 1,716.22 -1,410.30 3.812 10.06 0.84 9.38 Pass-NOERRORS 9,600.00 8,968.79 10,425.00 9,061.94 17.70 8.12 1.26 2,406.69 -1,462.20 3.812 707.58 1.18 706.64 Pass-NOERRORS 9,600.00 8,968.79 10,450.00 9,061.88 17.70 8.25 1.78 2,422.71 -1,443.02 3.812 722.27 1.19 721.29 Pass-NOERRORS 9,600.00 8,968.79 10,475.00 9,061.66 17.70 8.37 2.31 2,437.50 -1,422.86 3.812 738.25 1.20 735.21 Pass-NOERRORS 9,608.23 8,972.19 10,400.00 9,061.88 20.23 7.98 -0.55 2,389.50 -1,480.35 3.812 692.02 1.16 691.17 Pass-NOERRORS 9,618.31 8,976.45 9,625.00 8,970.56 23.32 1.30 -28.54 1,724.87 -1,432.76 3.812 22.17 0.92 21.38 Pass-NOERRORS 9,620.00 8,977.17 10,300.00 9,053.49 23.84 7.35 -5.04 2,311.81 -1,542.07 3.812 622.71 1.21 621.99 Pass-NOERRORS 9,620.00 8,977.17 10,325.00 9,056.42 23.84 7.51 -4.31 2,332.17 -1,528.15 3.812 640.80 1.19 640.07 Pass-NOERRORS 9,620.00 8,977.17 10,350.00 9,059.38 23.84 7.68 -3.58 2,352.17 -1,513.45 3.812 658.68 1.17 657.94 Pass-NOERRORS 9,620.00 8,977.17 10,375.00 9,061.24 23.84 7.83 -2.93 2,371.28 -1,497.45 3.812 675.87 1.15 675.11 Pass-NOERRORS 9,630.04 8,981.50 10,275.00 9,050.87 26.95 7.18 -7.32 2,290.54 -1,555.25 3.812 604.21 1.22 603.56 Pass-NOERRORS 9,635.27 8,983.79 9,650.00 8,976.92 28.57 1.57 -27.66 1,735.94 -1,454.23 3.812 38.09 0.99 3724 Pass-NOERRORS 9,640.00 8,985.88 10,200.00 9,045.29 30.03 6.65 -10.83 2,223.08 -1,587.30 3.812 545.60 1.28 545.00 Pass-NOERRORS 9,640.00 8,985.88 10,225.00 9,046.68 30.03 6.83 -1021 2,246.17 -1,577.84 3.812 565.64 1.26 565.05 Pass-NOERRORS 9,640.00 8,985.88 10,250.00 9,048.60 30.03 7.01 -9.55 2,268.77 -1,567.32 3.812 585.40 1.24 584.83 Pass-NOERRORS 9,648.42 8,989.62 9,675.00 8,982.87 32.62 1.85 -2727 1,749.72 -1,474.20 3.812 57.29 1.04 56.40 Pass-NOERRORS 9,650.00 8,990.33 10,150.00 9,043.60 33.11 6.27 -13.52 2,175.90 -1,603.72 3.812 504.89 1.30 504.32 Pass-NOERRORS 9,650.00 8,990.33 10,175.00 9,044.50 33.11 6.46 -12.93 2,199.64 -1,595.96 3.812 525.40 1.29 524.86 Pass-NOERRORS 9,654.86 8,992.51 10,125.00 9,042.30 34.59 6.08 -14.89 2,151.79 -1,610.18 3.812 483.92 1.30 483.38 Pass-NOERRORS 9,658.20 8,994.01 9,700.00 8,988.28 35.60 2.12 -27.10 1,765.71 -1,492.64 3.812 78.74 1.07 77.84 Pass-NOERRORS 9,660.00 8,994.82 10,050.00 9,037.52 36.16 5.47 -17.43 2,077.82 -1,619.51 3.812 417.41 1.30 416.79 Pass-NOERRORS 9,660.00 8,994.82 10,075.00 9,039.28 36.16 5.67 -16.85 2,102.50 -1,617.79 3.812 439.96 1.30 439.38 Pass-NOERRORS 9,660.00 8,994.82 10,100.00 9,040.89 36.16 5.88 -16.27 2,127.26 -1,614.76 3.812 482.20 1.29 461.66 Pass-NOERRORS 9,665.22 8,997.16 9,725.00 8,993.15 37.73 2.38 -26.92 1,783.43 -1,509.57 3.812 101.66 1.09 100.76 Pass-NOERRORS 9,668.70 8,998.71 10,025.00 9,035.39 38.79 5.26 -19.40 2,052.72 -1,620.06 3.812 394.35 1.28 393.76.Pass-NOERRORS 9,670.09 8,999.34 9,750.00 8,997.71 39.21 2.63 -26.58 1,802.58 -1,524.99 3.812 125.47 1.11 124.59 Pass-NOERRORS 9,671.76 9,000.08 10,000.00 9,033.02 39.73 5.05 -20.53 2,027.84 -1,619.48 3.812 371.13 1.27 370.53 Pass-NOERRORS 9,673.12 9,000.69 9,775.00 9,002.23 40.15 2.88 -25.94 1,823.04 -1,538.58 3.812 149.85 1.12 148.98 Pass-NOERRORS 9,675.11 9,001.58 9,800.00 9,006.66 40.77 3.12 -25.29 1,844.23 -1,551.09 3.812 174.47 1.13 173.63 Pass-NOERRORS CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 4/28/2014 11:40.'12AM Page 18 COMPASS 5000.1 Build 61 Ilia/ BP BAKER MGMES Travelling Cylinder Report 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-36-Slot 36 Project: Prudhoe Bay TVD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Reference Site: PB E Pad MD Reference: 57:36 6/12/1995 00:00 @ 64.10usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: E-36 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore E-36B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 4 Offset TVD Reference: Offset Datum Offset Design PB E Pad- E-36-E-36A-E-36A Offset Site Error: 0.00 usft Survey Program: 152-MWD,9224-MWD Rule Assigned:NOERRORS Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Tcolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS •EI-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) F) (usrt) (usft) (in) (usft) (usft) (usft) 9,680.00 9,003.76 9,825.00 9,011.05 42.32 3.37 -25.32 1,865.50 -1,563.47 3.812 19922 1.13 198.42 Pass-NOERRORS 9,680.00 9,003.76 9,850.00 9,015.26 42.32 3.62 -24.75 1,886.94 -1,575.61 3.812 223.97 1.16 223.19 Pass-NOERRORS 9,680.00 9,003.76 9,875.00 9,019.07 42.32 3.87 -24.26 1,909.03 -1,586.68 3.812 248.85 1.17 248.10 Pass-NOERRORS 9,680.00 9,003.76 9,900.00 9,022.62 42.32 4.12 -23.81 1,931.60 -1,596.82 3.812 273.76 1.20 273.05 Pass-NOERRORS 9,680.00 9,003.76 9,925.00 9,025.75 42.32 4.37 -23.37 1,957.79 -1,60562 3.812 298.63 1.21 297.95 Pass-NOERRORS 9,680.00 9,003.76 9,950.00 9,028.51 42.32 4.61 -22.91 1,978.62 -1,612.63 3.812 323.32 1.23 322.69 Pass-NOERRORS 9,680.00 9,003.76 9,975.00 9,030.93 42.32 4.83 -2239 2,003.03 -1,617.39 3.812 347.64 124 347.06 Pass-NOERRORS CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 4/28/2014 11:40:12AM Page 19 COMPASS 5000.1 Build 61 -r i 1 .. 1 1 14 I "1•41C1011.41161 i 1 I y) U U ► I 26 2 11•... I UE1 AIL rp' 1011 1 °4P.. t I 11 !- :i:E. i• . - . .... i - • . ' :: :•"". ::. / i i fil II I III Ia -.- „. iv. liiiiii p.� 1 i I if 1010106.71011:'40,k zbgs�g I I �pn�w F. I al 1 3 �`m I Q '2 I 1 } 1 ccn Q 1 1 .. 1 o V 1 I �I J LL Q I o .. I I I 2 Ory 1 Pk t. I Z I ° .. a 1 O I11 I F 1 III J E f if P i 1 -.- -. I I Ions Amu 1\J I ' \ I W= W coo)z.Q11s o' - N g im °� a IWi i' u § \O .2 1 i , \\ : 1 1 u, . .. IMIj d I f., y I , \ 0 I F- s f— 1 m mile U 3 m,, _ = l �.1 sie" : . 1 1 J 1 i I ce (� ° 1 z Z a � I MI �i B U m s I =m I IN o; o I I I LL J o Z 1 �� a �" f U I a I ,I '.- OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME: Li( PTD: 2—/ L7 Com-_) Development _Service _Exploratory _Stratigraphic Test _Non-Conventional , ' 7 FIELD: POOL: �Es L- Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI LATERAL The permit is for a new wellbore segment of existing well Permit (If last two digits No. , API No. 50- - - in API number are Production should continue to be reported as a function of the original between 60-69) API number stated above. In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name Pilot Hole ( PH) and API number (50- - - - ) from records, data and logs acquired for well(name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce / inject is contingent upon issuance of a Spacing Exception conservation order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10'sample intervals through target zones. Please note the following special condition of this permit: Production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application,the following well logs are Well Lo ,n also required for this well: gg g Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 4/2014 To co a) N N a) 6 o -a- ID m C a a c ca L C N -o co 2 a w O o co > o O O C a -o L • w oN c o - co E O 0 J CO C o < II ni 0) p a) a) 3 a @ E c V x o a)la - cp. co N L M a) a) C a M o ° 'o O C C -po = o) d o N U ° w C m 3 c co .CO 2 0 n (o m e CV a N ° o N 2 O O n5 C .L.. 7 co w O a) LO J 0 N 3 0 `O o) .5 o a ° ° Q 13 Q -q o L 3 Y a (1) N 6 V Nin C 01 0 O N • ,- ..-• a) -_-- E C C C a) p_ N a) ° O co 3. C CO 0 O E U. Cl).o a O p N co F- c�0 U N U • E > a j ch �i a) i i Y L N O N W L... J (n N O O a) w �6 Z o m O ° coco o 0 • c 0_ c w c a) pa) _ 'u) CO _ >- a) O - .o O aJ E o. co Qj co d di I r Q >co — Y O = O co a) E M ° 0 co W 7• LO Cl) co C O w T OU N N a Co m C) a) O a c I a) Y co D a) a) v E .co m y i `O 0 a w m 3 co ° O N. N o_ -o _ ° 2 S) 2 a 3 F o m m 3 O N *"§- 9 ch a O w N co N T N U o- a) a) co Y c 7. a) .N N I *O co C > = C N N > C C a a `) ao o < 3 - .0) 0) c co of CO o Co Cl)) o a)) O O @ w @ N CO CONa) a) (o N N N N cEa) 26 U` 0 0c O U U > (n a0 '� E N a) O 'O a) 3 a) z U N D N 7 a) a) co N 0 o_ o o co ca Z ,c _c Cr O Q o 7 7 0 0) 1- 'c N o_ co 0_ X" IL CO 0 0_ U O O U) U) o_ U o_ < 2 2 I W w a > w 0 < aa)) aa)) aa)) aa)) aa)) aa)) aa)) aa)) aa)) aa)) aa)) aa)) Q Q < < < < < < aa)) aa)) aa)) aa)) a) < aa)) aa)) aa)) aa)) aa))0 ) < 0 aGO a)) < < < c_ z >- >- >- >- >- >- >- >- >- >- >- >- z z z z z z z z >- >- >- >- >- Z >- >- >- >- >- >- Z Z >- Z z z T F' Q a) N w co N ; 0 o C U `n O C _ To a) a) E 3 - E a) O 0 U .5. C C * N O O o U N v ->":, d N oo_ E _T O C L Lc) u ° o a) -a- 0 o o Fa,._. 3 E3 0 co O O co U 0 U C o c O OW o a) co cco co Q O O N o- O "6 N C Q a) N• U a @ U LL N D o a) n C a 4 Q = wv -- ° : m o a) o o .. p C w ai c° aw w a T N E O ND c 3 O > .c 00 COC a N 3 1 N wN ` u) . o c 2 • 7oQ N> NI 1 om3o a CO ° °o ° co OcC N cri O a) _0 m z L ) U > ( co O O) L C 6 � ) c < N N aN a)o N a EC o . ..„„ . ' a) oco m� o2 N0a 0)0 Q E E ' a.. CCE c xw aa o 2 0 0 . ° ° ° n o o Q o c U Q0 ` 3a m3 - 0 m. H Cr C s o a) a) • c ° O 0 o o o mco .. rn o Yo Cr J UU o >, o7 = o -0 o ( = 0 > E E m -No a) o a) co 3 . o Q eacccur3L L - c E ' a - ca co ' L o Lov o Z a a) oN 'to'oc a 112 -0 3 o o ° N '� 3 ao Q a) U a .� N o a) To > - .. o o w oU o O o oc " N a) OOC v an a) CL = -p C N ` oa3 p a Oa) a) apo 2 ° O o Y a) O N E O @. E L o Na oNC I- o a -o a) a) 9 = ° c c a o a) — a a) '- m -p_ mEm o w c o °e5 Q L a aa COso) _ aNN a 1E ' a6aa7 co o) co OaC U 3 N N Oco C L U oEOp °- .(n N co c- cN O >, N = N > O a T) O D. N C s a sN N a) a) ) 3 C 'O C CC - QOO U Oaa) . aNN > 3 " LOU w aaa ° c a °) N maa > '� m Cc 0 -E To co o_ m ) ) ) o .§ c) c oao5m a) co Xo - ( - o m m ao U o o ° a) a) = a) E -o o - c 0 o co o U cI- w w C U U U o o oo ° o U n0 C0aooaa) -` o r ; oE ' 'C ° No -o we op o o . @@ ° o c U > > 3 0) 7 m uaa) o a a) m maN YLE ma J co `E cu) .6 aa) aa ` aE E CC F F 8 > c o a o ` o as co e a) N C 7 a s a) a) co - do o a 2 2 2 co -o o ..o• m O O Lo na) aCO a) a) o 00 = a JJ cn ) O0o_ o_ c.) Qaz 0cn0000 < < ± ococo0 N2 o_ 0ncn0 k� co W a O N CO V IC) c0 N- CO CA O N CO V IC) V7 r Co CA O N CO c0 cp r Co 0) V l I EO ,- N co V CC) c0 r Co 0) CO `r N- °° N N N N N N N N N N co CO CO CO CO CO co CO co CO U v v v 2 Oci, c a) o d o m o o CO M O N O. V a) o f N E a) 0E J •c a o a `o, w O ).- 0 041 • I- v E aLL� ci a > d a o Q Q w Q (7 Q