Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout214-0647. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: Conductor Surface Intermediate Production Liner 520 2670 5080 5410 7500 Structural Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: 13b. Pools active after work: Sr Pet Eng:Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations RBDMS JSB 062724 WCB 9-10-2024 By Grace Christianson (grace.christianson@alaska.gov) at 2:51 pm, Jun 25, 2024 DSR-6/26/24 OF ALAS ALASKA OIL AND G STCONSER ATION COMMISSION 0000V `r REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑ Suspend ❑ Perforate 0 Other Stimulate ❑ Alter Casing ❑P.® p/��o Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well 11 CM / \13 `«�Kt] 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development 0 Exploratory ❑ 5. Permit to Drill Number: 214-064 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service ❑ 1 6API Number: 50-029-20154-02-00 7 Property Designation (Lease Number): ADL 0028308 8. Well Name and Number: PBU 02-078 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 12820 feet Plugs measured 12000, 12190 feet true vertical 9028 feet Junk measured None feel Effective Depth: measured 12000 feet Packer measured 9363, 9521 feet true vertical 9030 feet Packer true vertical 8165, 8277 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 80 20" 27-107 27-107 1530 520 Surface 2717 13-3/8" 26-2743 26-2743 4930 2670 Intermediate 7447 9-5/8" 24-7471 24-6919 8150 / 6820 / 6870 5080 / 3330 / 4760 Liner 2478 7" 7270-9748 6737-8456 7240 5410 Liner 1210 4-1/2" 9572-10782 8315-9025 8430 7500 Liner 2801 3-1/2" x 3-1/4" x 2-7/e" 10019 - 12820 8702-9028 10160 / 10570 10530 / 11160 Perforation Depth: Measured depth: 11487 - 12755 feet i True vertical depth: 9032-9025 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6#, 13Cr85 / L-80 9474-9576 8243-8318 4-1/2" HES TNT Perm Packer 9363 8165 Packers and SSSV (type, measured and 4-1/2' Baker S-3 Perm Packer 9521 8277 true vertical depth) No SSSV Installed 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 250 25339 22 0 763 Subsequent to operation: Shut -In 780 0 14.Attachments: (mgmred per 20 MC 25.07025071, a 25.283) 15. Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development 0 Service ❑ Stretigraphic ❑ 16. Well Status after work: Oil 0 Gas ❑ WDSPL ❑ Copies of Logs and Surveys Run ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Authorized Name: Oestgaard, Finn Contact Name: Oestgaard, Finn Authorized Title: Produoon Engineer Challenger Contact Email: Finn.Oestgaard@bp.com Authorized Signature: Date: Contact Phone: +1 907 564 5026 Form 10-404 Revised 0412017 Ah_ G✓ RBDMS H FEB 0 5 2020 .e''6"ZCL�e� Submit Original Only Daily Report of Well Operations PBU 02-07B ACTIVIT7nATF m uAuwev ***WELL S/I ON ARRIVAL***(pert) RAN 3.805" GAUGE RING TO ROCK SCREEN @ 9,332' MD RAN 20'x 3.70" DUMMY WHIPSTOCK TO 3,000' PULLED ROCK SCREEN FROM 9,332' MD (no serious wear on slotted liner) ***CONTINUE WSR ON 9/11/19*** 9/10/2019 ***CONTINUE WSR FROM 9/10/19*** (pert) DRIFTED TO DEVIATION @ 10,462' SLM W/ 37'x 2" DUMMY GUNS (2.31" rings) 9/11/2019 ***WELL LEFT S/I ON DEPARTURE, DSO NOTIFIED OF STATUS*** ***WELL SHUT IN ON ARRIVAL***(rpm hoist) LOG RPM GASVIEW MAIN PASS AT 9 FPM WHILE PUMPING 0.5 BPM FROM TAG AT 10520' TO 9420'. LOG RPM REPEAT PASS FROM 10520' TO 10342'. LOG THREE RPM C/O ACTIVATION PASSES AT 3 FPM WHILE PUMPING 0.5 BPM FROM 9560'-9450' 9/12/2019 ***JOB COMPLETE***. CTU #9 1.75" coil / Job Objective: Adperf MIRU. Make up Drift/Log BHA with GR/CCL in carrier with 2.30" JSN, RIH. Load well with 1% KCI w/ SafeLube. Tag CIBP at 11964' and log up to 1 1000'painting a white/blue flag at 11875'. POOH. Confirm +25' correction and corr. CIBP top of 11990'. Make up Perf Gun run #1 with 31'x 2" PowerJet Omega perf guns, 6 spf. RIH. Tag CIBP and correct to bottom shot. Perforate 11645' - 11676'. POOH. Verify shots fired and ball recovered. 1/13/2020 *** In Progress *** CTU #9 1.75" coil /Job Objective: Adperf MU Gun #2 with 31'x 2" PowerJet Omega perf guns, RIH. Tag CIBP and correct to bottom shot. _ Perforate interval 11549-11580 after surging pump and launching additional ball, POOH. Shots fired and both balls recovered. Make up Perf gun run #3 with 31' x 2" PowerJet Omega, 6 spf, pert guns, RIH. Tag CIBP and correct to bottom shot. Perforate interval 11518-11549'. POOH. Shots confirmed and ball recovered. MU Gun run #4 with 31'x 2" PowerJet Omega, 6 spf, pert guns, RIH. 1/14/2020 *** In Pro ress *** CTU #9 1.75" coil / Job Objective: Adperf Tag CIBP and correct to bottom shot. Perforate 11487 - 11518. POOH. FP well with 60/40. Shots fired and ball recovered. RD 1/15/2020 ***Job Complete*** SAFETYMAX DLS 24.4* @W 0456NGLE > 70' 10466'. 02-07B ELL .LEV - 323di 4 20COED 1 4rgle = 100" 70698' 94# N-40, n MD = 10203' 0-19-124" nTVD= B800'SS 133/8" CSG, 72#, N-80 BTRS, ID =12.347" 2732T 9-5/8" X 7" BKR LTP & HGR, D = 625" 7270' — 9Sl8" CSG , 40 # / 47#, N-00 / RS -95, 7471• ID = 8.835"18.681' Minimum ID = 2.377" @ 11472' 3-3/16" X 2-7/8" XO 4-12" TBG, 12.6#, 13CI485 VAM TOP, 9470' 0152 bpf, D=3.958" 412• TUBNG STUB (02/20111) 9474• —1/2"LINER I- 9572' D = 3.958" 9576' ID = 6.276" 9748' LNR, 92#, 12.6#, L-80 BT -M, .0752 bpf, D = 3.958'-• 10782' LNR, 6.6#, L-80 TCI, .0079 bpf, D = 2.850' -F 11472 PERFORATION SUMMARY CWH4-1/16" LHEAD= FMC JATOR= BAKERC ELEV = 53' ELEV= 58.77' SAFETYMAX DLS 24.4* @W 0456NGLE > 70' 10466'. 02-07B ELL .LEV - 323di 4 20COED 1 4rgle = 100" 70698' 94# N-40, n MD = 10203' 0-19-124" nTVD= B800'SS 133/8" CSG, 72#, N-80 BTRS, ID =12.347" 2732T 9-5/8" X 7" BKR LTP & HGR, D = 625" 7270' — 9Sl8" CSG , 40 # / 47#, N-00 / RS -95, 7471• ID = 8.835"18.681' Minimum ID = 2.377" @ 11472' 3-3/16" X 2-7/8" XO 4-12" TBG, 12.6#, 13CI485 VAM TOP, 9470' 0152 bpf, D=3.958" 412• TUBNG STUB (02/20111) 9474• —1/2"LINER I- 9572' D = 3.958" 9576' ID = 6.276" 9748' LNR, 92#, 12.6#, L-80 BT -M, .0752 bpf, D = 3.958'-• 10782' LNR, 6.6#, L-80 TCI, .0079 bpf, D = 2.850' -F 11472 PERFORATION SUMMARY REF LOG: SWS ON 01/1258 ANGLE AT TOP PERF: 92" @ 11487' Note: RefertD Production DB for Nstodcal perf data SIZE SPF INTERVAL OprVSgz I SHOT SOZ 2• 6 11487-11580 O 01/1520 16 0822/14 2' 6 11645-11676 O 0111320 SO 2- 6 11865-11929 O 0624/17 47 2- 6 11950-11929 O 06/24/17 2' 6 12030-12160 C 07/09/14 2' 6 12205-12420 C 07/09/14 2" 6 12480-12670 C 07/09/14 2- 6 12725-12755 C 07/09/14 L-80 STL, .0058 bpf, 12 FESX NP, D=3.813" GAS LIFT MANDRELS ST MD WD DEV TYPE VLV I LATCHPORT DATE 3 3719 3697 20 MMG DOIrE RK 16 0822/14 2 6652 6186 291G DJ/JMD SO RK 20 0822/14 1 9215 8062 47 KBG2 DMY BK 0 02/22/7 7 TOP OF MILLOUTVVINDOW (02-07A) 7471' 9363• -17 X 4-12" HES TNT F 940— 4-112 HES X NP. D = 9485' 1--J7 X 17 X 4-112" BKR S-3 PKR. D= 3.875' 1 9554• H4-12"HESXPP,D=3.873" 9572' 7" X 4-12" BKR LW GR PKR 9576' 4-12" 1PoLEG, D = 3.958" RM TT NOT LOGO 10019 45 KB LTP, D = 2.440 (07/05/14) 10030' 3.70'DEPLOYMB4TSLEEVE,D=3AP 10052' 3-12• HES X NP, D = 2.813' 1� 3-1/2' X 33/16' XO, D = 2.786' MLLOUT WINDOW (02-076) 10782'- 10791' 11100• TOC (07/06/14) 11462' RA MARKER PUP JOINT DATE REV BY COMMENTS DATE REV BY COMMENTS 031301/5 RIG 51ORIGINAL COMPLETON 0826/14 STF/JMD GLV C/O OBf22114) OBA458 N22E RWO 0227/15 JTC/JMD SET WFD CBP (0220115) 0224111 NTES RWO 0627/17 DLW/JMD SET CBP& ADPERFS(0624117) 07MOM4 NORDICII CTD 01/1620 MTWJMD ADPERF (01/13 & 0111520) 0722314 DJ/JMD FINAL ODE APPROVAL 01/3020 DD/JMD ADDED OKB, REF, & BF ELEV 0724/14 DJ/JMD RECALCULATED TOC X 2-7/8" XO. D = 12-718' WFD GBP (0624/171 1 PRUDHOE BAY UNIT WELL' 02-076 PERMIT No: F2140640 API No: 50-029-20154-02 SEC 36, T11 N, R14E,1567' FNL & 103E BP Exploration (Alaska) Baker 2�1 PRINT DISTRIBUTION LIST Hughes COMPANY BP Exploration Alaska Inc. WELL NAME 02-07B FIELD Prudhoe Bav Unit COUNTY North Slope BHI DISTRICT Alaska AUTHORIZED BY Dirk Zeijlemaker EMAIL Dirk.zeiilemakerQbakerhuahes com STATUS Final Replacement COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION V No 21 4064 31500 Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, 1-112-1 900 E. Benson Blvd. Anchorage, Alaska 99508 or AKGDMINTERNAL@bp.com Ito acknowledge receipt of this data. LOG TYPE RPM:PNC3D-CO LOG DATE September 12, 2019 TODAYS DATE Revision Details: November 21. 2019 Rev. Requested by: --- FIELD/ FINALCD/DVD EOA, PBOC, PRB-20 (Office 109) FINAL D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker PRELIM LOGS (las, dlis, PDF, META, SURVEY REPORT LOGS 61 BP Exploration (Alaska) Inc. CGM, Final Surveys) (Compass) 1700 G Street # OF PRINTS Anchorage, AK 99501 # OF COPIES # OF COPIES # OF COPIES �l V 1 BP North Slope. EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker 900 E. Benson Blvd. 1 Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. 1 Attn: Ricky Elgarico 61 BP Exploration (Alaska) Inc. I ATO 3-344 Petrotechnical Data Center, LR2-1 1700 G Street 900 E. Benson Blvd. Anchorage, AK 99501 3 ExxonMobil, Alaska 1 , Attn: Lynda M. Vaskell and/or Lisa Boggs Attn: David Itter :3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska - AOGCC 1 1 Atm: Natural Resources Technician If .333 W. 7th Ave, Suite 100 Anchorage, .Alaska 99501 C+] 5 DNR - Division of Oil & Gas '^" Attn: Garret Brown 1550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 61 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Attn: David Itter 0 TOTALS FOR THIS PAGE: 0 1 4 0 0 1110 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMIS* REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations ® Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate H Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: $G f C/9P 17( 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 214-064 3. Address: P.O.Box 196612 Anchorage, Development 0 Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20154-02-00 7. Property Designation(Lease Number): ADL 0028308 8. Well Name and Number: PBU 02-07B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL „,,,i,.11.Present Well Condition Summary: SIE Total Depth: measured 12820 feet Plugs measured 12000/12190 feet AUG F 'J n f true vertical 9028 feet Junk measured feet t I 7 Effective Depth: measured 12000 feet Packermeasured See Attachment feet true vertical 9030 feet Packer true vertical See Attachment feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20”94#H-40 27-107 27-107 1530 520 Surface 2710 13-3/8"72#N-80 26-2736 26-2736 4930 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 11865-11929 feet 11950-11982 feet 12030-12160 feet 12205-12420 feet 12480-12670 feet 12725-12755 feet True vertical depth: 9031-9029 feet feet 9030-9030 feet 9031-9029 feet 9030-9029 feet 9030-9019 feet 9023-9025 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: sCANNED N 0V 0 12017, 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 279 25492 30 420 787 Subsequent to operation: 427 4671 66 450 215 14.Attachments:(required per 20 AAc 25.070.25.071,&25.283) 15.Well Class after work: - Daily Report of Well Operations ® Exploratory ❑ Development IA' Service 0 Stratigraphic 0 Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil Iv1 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Stone,Christopher Contact Name: Stone,Christopher Authorized Title: DS 2&18 PE Contact Email: Christopher.Stone©bp.com Authorized Signature: Date: 0,10_ Contact Phone: +1 907 564 5518 Form 10-404 Revised 04/2017 j/7. to/6 d i I„V7 RBDMS tiv AUG 1 1 2017 Submit Original Only . • • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue ,, . ,.. Anchorage, AK 99501-3572 E i VEri AUG 072017 RE: BP Exploration (Alaska), Inc. A .. GC Report of Sundry Well Operations Summary August 4, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Setting of a Plug and Adding of Perforations for Well 02-07B, PTD # 214-064. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage,AK 99519-6612 . • • Packers and SSV's Attachment PBU 02-07B SW Name Type MD TVD Depscription 02-07B PACKER 7267.82 6734.96 7" Top Packer 02-07B TBG PACKER 9360.38 8162.99 4-1/2" HES TNT Perm Packer 02-07B TBG PACKER 9518.75 8275.31 4-1/2" Baker S-3 Perm Packer 02-07B \ PACKER 9569.8 8313.42 4-1/2" Top Packer • • • w a O O O O O O O O O 0 0 0 CC CO N N- 00 M CO O O CM N O Cn CO O M N- O LO O O LO O N co I� 00 I� U CD CD M M• uo CD _Co N CD Ns Cf) rt M ( N C CD j N CD M 00 CO CO OO 00 co ti 000 O CO CD 00 CO 0 N- Ns 0 Cn 121 O N Co O CO N M 00 Cn N Li, co N O N- t O) Co 0 O N- O O N M N N U) CO CO Co 0 Co 0 0 OD Co H O N- Ns L0 M N 0 N CO N- CO CC) 00 . d MT- O CC) M N 17 (V N N .7 0 00 N- M Ps Ps O N N N C[) CO CO 00 CO 00 0 Co M 000 CO N- ONO CO ti N 00 Ps NNC) (D Ps N00 CN cn tIA T- c- T V CU El II 1 1 1 1 1 1 1 1 1 1 m Q O N CO Ul co N .7 M M N ( O C) vr N Ps Nr CN N0I- N0) 0 O m It) D. OrnCDOrn CD OD O °O i Orn I O i Orn OD 0D (3 of 1 � � Z (4OrnJJJJC'7J r N % N4t N- JCONNCA ; CSO• U OM -0\0 0\0 00 CV N � � CD 4 MM (NI T- 4 4= _ 00 00 _ )O▪ O- C) 00 N 0 Ps � CCS CO C CO CO C Co N- V OD CD N N CO M co 0 d N N M T N '- . T- 0 W W W W • Q Q Q Q c- U O W 0 C C C W W W W u_ CCCCCCCC Z ZV C CC CC CC CC Z pc W W W W W W W W W m m QF- F- F- ZZZZZ � � V Z Z Z J J J J J F- F- 0 • c 2 3 P 3 [ / E0 a ® o 2 2 0 0 ® \ « $ 0 0 0_ $ o _CO/ % § £ + b - o « E b w £ R - t Cr) o% f o » 0_ 44 \ Q = & p o a) a / �- 6- ebf % = 22 2U � � � � k / � � -a ) 4 9 E 0 co a ° ET 2 < _ o L c0 . . § � U� 23 k / \ o m = I_ n o ■ c "0 / D - 2 = : 2 � fD2 2 °) 2 � § / % � �_ / � � k � \ co ■ - •16 2 t - , a) 0 C = c u m ® T—• ± o ¥ a 2 ? u) R 2 = 2 7 , - c m ± E2 � _ . I moo = � L3o E ■ < o = o - o Eco ■ i- - o - 0 E Q L 2 1 2 0 Ce t 2 o o t ¥ F f >' ƒ k E / § ƒ k / ƒ ° 7 ƒ / _ l ® O m u) °-\ \ 7 / o ¢ _ @ 2 E 7 � r- co _ _ ¥ _ LI- g t 2 § g & § \ g b / f ae0 � E .E. em02T- c 6- o o = � � = > = / ƒ f ° O \ \ � kc o CO \ d 72 & .,= '-§ \ � \ 0 o• - � / / / � 003 E � � h e 62n = = 60 ■ o- 6770 Ce o2 /, � [ / / ƒn = a a) 2 2 b S \ \ / a & ¥ 2 2 » \ Ci• k � � L � k / � % % � k �� k a) ■ > I t c 7 ® a Q O m w Tu � •2 w a 0 m / E 0) / F- ƒ 2 / kR - -� N. =0 00 co _ _ & o . I_ .m � UU £ 44. ° k f k k N. k k ' 2 # \ ° 0 2 ° U -J E @ 0 -' o U) o o / a 1- -J k 0 >< ) .00 ® - w - @ & , w a) r o cu F I- 0 .- _ / te a U 2 g2 0 - 0 a R O E F U O - n ; - m om W < ¥ ¥ ¥ ¥ \ \ � � ¥ I- CO CV \ � q & � I- o $ $ < • TIS=� ClWH4-1/16" • WELLtEAD= FMC SA NOTES: WELLANGLE>70°@ 10466'. ACTUATOR= BAKER C �O MAX DLS:24.4°@ 10456'. NITIAL KB.ELE 58' BF. ELEv- ? I KOP= 7 20"COND, -1 100' - Max Angle= 100"@ 10698' 94#,"°, I I 2208' -4-1/2 HES X NP,D=3.813" Datum MD= 10203' D=19.124" GAS LFT MANDRELS Datum TVD= 8800 SS ST MD TVD DEV TYPE VLV LATCH FORT DATE 13-3/8"CSG,72#,N-80 BTRS,D=12.347" 1- 2737' 13 3 3719 3697 20 MMG DOME RK 16 08/22/14 2 6652 6186 29 MMG SO RK 20 08/22/14 1 9215 8062 47 KBG2 DMY BK 0 02/22/11 9-5/8"X 7"BKR LW&HGR ID=6.25" - 7270' MLLOUT WINDOW(02-07A) 7471'..?' 9-5/8"CSG,40#/47#,N-80/RS-95, H 7471' F [1 - D=8.835"/8.681" ' ' 9332' -14-1/2HES X NP,D=3.813" Minimum ID = 2.377" @ 11472' g 9363' -{7X4-1/2"HES TNT R(RD=3.875" 3-3/16" X 2-7/8"XO I , i 9400' -14-1/2 HES X NP,ID=3.813" 4-1/2"TBG, 12.6#, 13CR-85 VAM TOP, H 9470' .0152 bpf,D=3.958" 1 2 9485' -17 X 4-1/2"UNIQUE OVERSHOT 4-1/2"TUBING STUB (02/20/11) -1 9474' x g 9521' H7 X 4-1/2"BKR S-3 PKR D=3.875" ' 1-----1 9554' -4-1/2"HES X NP D=3.813" 1 TOP OF 4-1/2"Lt' -1 9572' 9572' --17"X 4-1/2"BKR LNMHGR PKR 4-1/2"TBG, 12.6#,L-80 IBM.0152 bpf,D=3.958" -I 9576' 9576' ---{4-1/2"WLEG,D=3.958" 7"LMR,26#,L-80 BT-M .0383 bpf,D=6.276" H 9748' j , H ELM)TT NOT LOGGED 10019' -145 KB LW,D=2.440(07/05/14) 3-1/2"LMR,9.2#,L-80 STL,.0087 bpf,D=2.992" - 10084' _' 10030' H3.70"DEAL OY NEM SLEEVE,D=3.00" 10052' H3-112"HES X NP,ID=2.813" 4-1/2"WHIPSTOCK(06/27/14) --I 10782' 10084' -13-1/2"X 3-3/16"XO,D=2.786" 4-1/2"LNR,12.6#,L-80 6T-M,.0152 bpf,D=3.958" -1 -10782' MLLOur WINDOW(02-07B) 10782'-10791' 3-1/4"LNR,6.6#,L-80 TCI,.0079 bpf,D=2.850" H 11472' �" 11100' -1TOC(07/06/14)1 PERFORATION SUMMARY F. REF LOG: SWS ON 01/12/98 1 11462' (--I RA MARKER PUP JONT '0 ANGLE AT TOP PERE: 91'@ 11865' 11472' H3-3/16"X 2-7/8"XO,D=2.377" Note:Refer to Production D6 for historical pert data '211854' -RA MARKERPUP JOINT SIZE SR= INTERVAL Opn/Sqz SHOT SOZ 2" 6 11865-11929 0 06/24/17 -1 2" 6 11950-11929 0 06/24/17 12000' -2-7/8"WFD GBP(06/24/17) 2" 6 12030-12160 C 07/09/14 =pi 12190' -12-7/8"wFD CSP(02/20/15) 2" 6 12205-12420 C 07/09/14Li 2" 6 12480-12670 C 07/09/14 ii 2" 6 12725-12755 C 07/09/14 12784' HPSTD 1114. 2-7/8"LMR,6.5#,L-80 STL,.0058 bpf,D=2.441" - 12820' DATE REV BY COMMENTS DATE REV BY COMMENTS FRUDHOE BAY UNIT 03/30/75 RIG 51 ORIGINAL COMPLETION 07/24/14 DJ/JMD RECALCULATED TOC WELL. 02-078 08/04/98 N22E RWO 08/26/14 STF/JMD GLV GO(08/22/14) FERMI-No:"`1140640 - 02/24/11 N7E8 .RWO 02/27/15 JTC/JMD SET WFD CEP(02/20/15) AR No: 50-029-20154-02 07/10/14 NORDIC1 CTD 06/27/17 DLW/JMD SET CUP&ADFERFS(06/24/17) - SEC 36,T11 N,R14E,1567'FM_&1036'RAIL 07/10/14 JMD DRLG HO CORRECTIONS 07/22/14 DJ/JMD FINAL ODE APPROVAL BP Exploration(Alaska) STATE OF ALASKA RECEIVED 3KA OIL AND GAS CONSERVATION COML_SION APR O • REPORT OF SUNDRY WELL OPERATIONS 2 2015 1 Operations Abandon❑ Repair Well ❑ Plug Perforations 0 Perforate Other 6A J Performed. Alter Casing❑ Pull Tubing ❑ Stimulate-Frac ❑ Waived] Time Extension❑ Change Approved Program❑ Operat Shutdown❑ Stimulate-Other ❑ Re-enter Suspended WE 2.Operator 4 Well Class Before Work 5 Permit to Drill Number BP Exploration(Alaska),Inc Name Development 0 Exploratory El 214-064-0 3.Address: P 0 Box 196612 Stratigraphic ❑ Service 6.API Number Anchorage,AK 99519-6612 50-029-20154-02-00 ,7 Property Designation(Lease Number). 8 Well Name and Number ADL0028308 PBU 02-07B 9 Logs(List logs and submit electronic and printed data per 20AAC25 071). 10 Field/Pool(s) PRUDHOE BAY,PRUDHOE OIL 11 Present Well Condition Summary Total Depth measured 12820 feet Plugs measured 12190 feet true vertical 9027 83 feet Junk measured None feet Effective Depth measured 12190 feet Packer measured See Attachment feet true vertical 9029 98 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"94#H-40 28 22-108 22 28.22-108 22 1530 520 Surface 2710.04 13-3/8"72#N-80 27 72-2737.76 27 72-2737 74 4930 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production None None None None None None Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 12030-12160 feet 12205-12420 feet 12480-12670 feet 12725-12755 feet True Vertical depth 9030 65-9029 38 feet 9030 02-9029 1 feet 9030 17-9019 39 feet 9023 2-9025.23 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12 Stimulation or cement squeeze summary Intervals treated(measured). . Treatment descriptions including volumes used and final pressure 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 459 34446 16 0 891 Subsequent to operation. 398 12551 14 0 842 14 Attachments r 15.Well Class after work Copies of Logs and Surveys Run Exploratory ❑ Development El Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16 Well Status after work Oil E Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ❑ SUSP ❑ SPLUG ❑ 17 I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C 0 Exempt N/A Contact Garry Catron Email Garrv.Catrona.BP.Com Printed Name Garry Catron Title PDC PE Signature Phone 564-4424 Date 4/2/2015 V rL ¢/io/> 5— RBDMSJ* APR - 7 2015 , liz- 4(Mr Form 10-404 Revised 10/2012 Submit Original Only Packers and SSV's Attachment ADL0028308 SW Name Type MD ND Depscription 02-07B PACKER 7270.58 6737.44 7" Top Packer 02-07B PACKER 9363.14 8164.92 4-1/2" HES TNT Perm Packer 02-07B PACKER _ 9521 8276.96 4-1/2" Baker S-3 Perm Packer 02-07B PACKER 9572 8315.09 4-1/2" Top Packer I j a) fa.0• 0 0 0 0 o O 0 O 0 0 0 0 R O M O • U) O oC0 CD CoOf) C O O CO O I- r N N- V OOOOOOOOOOOr- O co Co (N I- O Tr CO C N i j CO CO CO Ca 1- CO CO CO CO N CO COD CO CSO 0) MCO 0) O vcr C CO CO N CO 00 rs" N CO O O N CO N- N cd ca co cd cNi c,°:' a) Tr N N O a- a) O N 0 I- 0 0 N- N Cr) N O CO 0) CO 0) 0) N CO CD M — vcr N CO O N I- N CO N vzt O M O N N O CO N ~ O CO ODI- ONCroN N • I-- CD (O O) Tr Tr co O O co N- Tr N N O) co N. co N- N- o N N N O CD CO CO CO CO 0) CO i+ N N N O NCD 0) N- O) N- O OD co OD N CDN 0)) 00) CU CO 2 QM MO) � N N N N N CD CO Co O O N N N0) = O ▪ O O O O • 0) 00) 00) CO 0 C)CO▪ Q O i 00 O J 00 CO 00 U e Z co J J J Z C) C d s • N (Ni O N *k CO _N •N • c - Tr w O) O CO - CO N O 0\0 0\0 0\p f` N M N V 04 LO 0) � 4 or) Cc) N 4 +' V N CO 0) CO 00 O O CD CO N I- I- O O CD s- CO CO C C70 00 O N V N CD M Cr) N- Tr 0) d N M N '- '- '- N O) i J W W W W Q Q Q Q C 0 0 0 0 y () W W W W W U 0aceCC � � Q' ccck Ik u.. ZZ Z W W W W W W W W W Cn Q H I— H Z Z Z Z Z 0 0 0 UZZZZJJJJJu) z @3 - r � im R2q ? w2 \ TD_ E /\ .) a ® \ @ § \ \ w C o u s t o2 +, U- .+71 . I O n .g $ as co 0 m e 0. O / - G / ± o G , _- g 2 a) 2 c�y � ) CSA — D = 3i_ 4- 0 :_)0— 0k \ z e > c a t Co / 2 % 2 % / o ® • t C CD - E oR \ Ce f / ek � §\ % $ / ID \ >.% / \- - § Cr) 7 U m 2 Of v- o E « 0 • m % 2 / / TREE= aWH4-1/16" ACTUATOR= BAKER CC 02-07B MAX DLS:24.4°@ 0456S: WELL NGL E>70° 10466'. !MAL KB.FILE 58' BF ELEV= ? I I KOP= _? 20'GOND, --I 100' — P 4# x Angle= 100'©10698' 9 ,N40• I I 2208' —i4 1/2 HES X NP,D=3.813" Oraturn ND= 10203' D=19,124" /4 GAS LFT MANDRELS Datum ND= 8800 SS ST ND ND DEV TYPE VLV LATCH PORT DATE 13-3/8'CSG,72#,N-80 BTRS,D=12.347' 2737' 13 3 3719 3697 20 MMG DOKE RK 16 08/22/14 2 6652 6186 29 MMG SO RK 20 08/22/14 1 9215 8062 47 KBG2 DMY BK 0 02/22/11 9.5/8"X 7"BKR LIP 8 HGR,ID=6.25" —1 7270' 14 MLLOUT WNDOW(02-07A) 7471'-7 9-5/8"CSG,40#/47#,N-80/RS-95, — 7471' D=8.835'/8.681" II ' 9332' —14-1/2 H6 P,D X N =3.813" Minimum ID = 2.377" d@ 11472' 9363' —17X4-1/2"FES TNT PKR,D=3.875" 3-3/16" X 2-718" XO I ' [.—9400' I-14-1/2 HES X NF,D=3.813" I 4-1/2"TBG,12.6#,13CR-85 VAM TOP, —I 9470' .0152 bpf,D=3.958" 1 2 9485' —17 X 4-1/2'UNIQUE OVERSHOT 4-1/2"TUBING STUB (02/20/11) —1 9474' Z C 9521' H7 X 4-1/2"BKR S-3 PKR,D=3.875' I • F 95154Th4:11—T-' 1 TOP OF 4-1/2"UNER —1 9572' . 9572' -17"X 4-1/2"BKR LNR/HGR FKR 4-1/2'TBG,12.6#,L-80 BM .0152 bpf,I)=3.958' H 9576' Fd 9576' —14-1/2"WLEG,ID=3.958" 7"LW,26#,L-80 BT-M.0383 bpf,D=6.276" H 9748' I-4 I r H ELMD TT NOT LOGO 10019' _-1 45 KB LTP,D=2.440(07/05/14) I 10030' H3.70"DEPLOYMENT SLEEVE,0=3.00- 3-1/2'LNR,9.2#,L-80 STL,.0087 bpf,D=2.992" —1 10084' 10052' —3-1/2"HES X NP,0=2.813" I 10084' —I3-112"X 33/16"XO,D=2.786" 4-1/2"WHPSTOCK(06/27/14) —I 10782' 4-1/2'LNR,12.6#,L-80 BT-M,.0152 bpi,D=3.958' — —10782' I NALLOUT VVNDOW(02-07B) 10782'-10791 3-1/4"LNR,6.6#,L-80 TC1,.0079 bpf,0=2.850" 11472' I 11100' —ITOC(07/06/14) R3RFORATDN SUMMARY 4 _ 1146r HRA MARKER PUP JONT REF LOG: SWS ON 01/12/98 14 ANGLE AT TOP PERE: 90"@ 12030' 11472' —I3-3/16"X 2-7/8"XO,D=2.377" Note:Refer to Roduction 06 for historical perf data SIZE SEE NTERVAL Opn/Sgz SHOT SQZ 11854' —IRA MARKER PUP JONT 2' 6 12030-12160 0 07/09/14 _r412190' H2-7/8"WFDCBP(02/20/15) 2" 6 12205-12420 C 07/09/14 II 2' 6 12480-12670 C 07/09/14 111 2' 6 12725-12755 C 07/09/14 • I 12784' H PBTD 2-7/8'L141,6.5#,L-80 STL,.0058 bpi, =2.441" H 12820' x��, M D DATE REV BY COMNBJTS DATE REV BY COMNB'ITS PRLDHOE BAY UNIT 03/30/75 RIG 51 ORIGINAL COMPLETION 07/24/14 DJ/JND RECALCULAT®TOC WELL: 02-07B 08/04/98 N22E RWO 08/26/14 STF/JM3 GLV C/O(08/22/14) R32MT No: 2140640 02/24/11 N7ES RWO 02/27/15 JTC/JND SET WFD CEP(02/20/15) AR No: 50-029-20154-02 07/10/14 NORDIC1 CTD SEC 36,T11 N,R14E,1567'RC 8 1036'FWL 07/10/14 JA/13 DRG HO CORRECTIONS 07/22/14 DJ/JNNAL OLEAR'ROVAL j D FINAL Exploration(Alaska)