Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
214-075
1a. Well Status:Oil Gas SPLUG Other Abandoned Suspended GINJ WINJ WAG WDSPL No. of Completions: 2. Operator Name: 3. Address: 4a. Location of Well (Governmental Section): 4b. Location of Well (State Based Plane Coordinates, NAD 27): 5. Directional or Inclination Survey: 6. Date Comp., Susp., or Aband.: 1b. Well Class: 7. Date Spudded: 14. Permit to Drill Number / Sundry: 15. API Number: 16. Well Name and Number: 17. Field / Pool(s): 18. Property Designation: 19. DNR Approval Number: 20. Thickness of Permafrost MD/TVD: 21. Redrill/Lateral Top Window MD/TVD: 8. Date TD Reached: 9. Ref Elevations: KB: 10. Plug Back Depth MD/TVD: 11. Total Depth MD/TVD: 12. SSSV Depth MD/TVD: 13. Water Depth, if Offshore: GL: BF: Development Service Exploratory Stratigraphic Test 20AAC 25.105 20AAC 25.110 Surface: Top of Productive Interval: Total Depth: Yes No(attached) Surface: TPI: Total Depth: x- x- x- y- y- y- Zone- Zone- Zone- Submit electronic information per 20 AAC 25.050 (ft MSL) 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data within 90 days of completion suspension, or abandonment; or within 90 days of acquisition of the log, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page only if necessary. CASING WT. PER FT.GRADE TOP BOTTOM TOP BOTTOM HOLE SIZESETTING DEPTH TVDSETTING DEPTH MD CEMENTING RECORD AMOUNT PULLED CASING, LINER AND CEMENTING RECORD23. Yes No Yes No 24. Open to production or injection? If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd or liner run): 25. TUBING RECORD SIZE DEPTH SET (MD)PACKER SET (MD/TVD) 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Per 20 AAC 25.283 (i)(2) attach electronic information DEPTH INTERVAL (MD)AMOUNT AND KIND OF MATERIAL USED 27.PRODUCTION TEST Date of Test:Hours Tested: Flow TubingPress. Casing Press: Oil-Bbl: Oil-Bbl: Gas-MCF: Gas-MCF: Water-Bbl: Water-Bbl: Choke Size: Gas-Oil Ratio: Oil Gravity - API (corr): Production for Calculated 24-Hour Rate Test Period Method of Operation (Flowing, gas lift, etc.): WELL COMPLETION OR RECOMPLETION REPORT AND LOG Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7/11/2014 50-029-23515-00-000 J-30 214-075 Surface PRUDHOE BAY, PRUDHOE OIL ADL 0028281, 0028282 85-242698' / 2676' None 2002 / 1980 N/A 0 11/28/22 N/A 7/14/2014 4 4 5970565 5970528 643106 642893 MWD / GR / RES, Cement Evaluation 4466' FSL, 1460' FEL, Sec. 09, T11N, R13E, UM 4500' FSL, 1246' FEL, Sec. 09, T11N, R13E, UM 20"91.5#H-40 Surface 128'Surface 128'42" 15 yds Type Cement 9-5/8"40#L-80 Surface 2694'Surface 2672' 12-1/4"2143 sz LiteCrete, 237 sx Class 'G 3-1/2" 9.2#193'None Surface -270'Pump 15-bbls 15.8-ppg Class G Cement Not on Production N/A 38.3 N/A N/A 322-375 Sr Pet Eng Sr Pet Geo Sr Res Eng STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Date First Production: Form 10-407 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov By James Brooks at 3:19 pm, Dec 19, 2022 Abandoned 11/28/22 JSB RBDMS JSB 122922 xGDSR-1/3/23 28. CORE DATA Conventional Cores(s): Yes No Sidewall Cores(s): Yes No If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and persence of oil, gas or water (submit separate pages with this form if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071 no matter when acquired. 29. GEOLOGIC MARKERS and POOL BOUNDARIES: (list all encountered)30. FORMATION TESTS Well tested? Yes No If yes, list intervals and formations tested, briefly summarizing test results. Attach separate pages to this for, if needed, and submit detailed test information, including reports, per 20 AAC 25.071. MD TVDNAME Permafrost - Top Permafrost - Base Top of Productive Interval Formation Name at TD: 31. List of Attachments: Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a current well schematic diagram with each 10-407. Submit 10-407 and attachments in PDF format to aogcc.permitting@alaska.gov. All laboratory analytical reports from a well must be submitted to the AOGCC, no matter when the analyses are conducted per 20 AAC 25.071 Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. TPI (Top of Producing Interval). The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data within 90 days of completion, suspension, or abandonment, whichever occurs first. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. General: Item 1a: Item 1b: Item 4b: Item 9: Item 15: Item 19: Item 20: Item 22: Item 23: Item 24: Item 27: Item 28: Item 30: Item 31: INSTRUCTIONS Stan Golis Sr. Area Operations Manager Wyatt Rivard wrivard@hilcorp.com 907.777.8547 38 38 20282040 Daily Reports, Well photos and Wellbore Schematic Form 10-407 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2022.12.19 14:59:40 -09'00' Stan Golis (880) FULL ABANDONMENT - ALL CSG STRINGS & CONDUCTOR CEMENTED TO SURFACE AND CUT 42" BELOW TUNDRA ELEVATION (12/01/22) 6 joints of 3-1/2" tubing surface to 193' MD for plug cement mgr ACTIVITY DATE SUMMARY 7/16/2022 Remove diverter connector and adapter / install modified casing head on 9-5/8 mandrel casing hanger. NU THA and dry hole tree. M X M seal tested good at 1000 psi. 7/17/2022 IA = 0+ psi. TBG FL (pre MIT). No TBG in well, only 9 5/8" CSG to 2608'. Dry hole tree installed. No AL, no flowline or scaffold. TBG FL @ near surface. SV = C. MV = O. IA = OTG. 23:15 7/21/2022 T = 10. Temp = SI. No TBG in well only 9 5/8 CSG to 2608'. MIT-T to 1500 psi Target (Pre AOGCC) (PASSED). T FL near surface. Pumped 0.75 bbls DSL down TBG to pressure from 10 psi to 1802 psi. 1st 15 min lost 25 psi, 2nd 15 min lost 10 psi, total loss = 35 psi. Bled TP to 0 psi (0.50 bbls returned). Tags hung. Final WHP's = 0. SV, MV = C. IA = OTG. 11:00. 7/25/2022 T = 10. Temp = SI. MIT-T to 1500 psi Target ( AOGCC witnessed by Bob Noble) (PASSED). No TBG in well only 9 5/8" CSG to 2608'. T FL near surface. Pumped 1 bbl DSL into 9 5/8" CSG to pressure from 0 psi to 1717 psi. 1st 15 min lost 22 psi, 2nd 15 min lost 6 psi, total loss = 28 psi. Bled TP to 0 psi (1 bbl returned). Tags hung. Final WHP's = 0. SV = C. MV = O. IA = OTG. 11:30. 7/30/2022 T = 10. Temp = SI. Fluid in cellar. Dry hole tree. Fluid in cellar covering from 4:00 to 2:00 position. No sheen on fluid. Fluid has a pink hue, possibly from corrosion on conductor. No evidence of any leaks from dry hole tree, or circ ports on conductor. Hole cut in dust cover on top of conductor with good view down to cement inside conductor at 7:00 position. No visible fluid in flutes, appears dry. SV, MV = C. IA = OTG. 13:30. 8/6/2022 YELLOW JACKET E-LINE OBJECTIVE: REMOVE WELL TREE AND SET CIBP RIG UP YELLOW JACKET CRANE AND ASSIST WELL SUPPORT WITH TREE REMOVAL MIRU. MU AND RIH WITH 9/32 LINE. CCL SPANG JARS JUNK BASKET AND 8.3 GUAGE RING MIRU MU AND RIH WITH CCL T SET BAKER 20 TOOL AND 8.13 CIBP SET AT 270 FT. PLUG SET AT 270 FT: CCL TO COE 9.2 FT: CCL STOP DEPTH 260.8 FT LOG CORRELATED TO TUBING TALLY DATED 07/15/2014 SETTING DEPTH DETERMINED BY J. MORGAN PLUG CLOSED UPON DEPARTURE. 8/6/2022 T/I/O=0/0/0 RD Dry Hole Tree & THA. Slick line did there work. RU Dry Hole Tree & THA. Torque to API specs. FWP's=0/0/0. JOB COMPLETE. Daily Report of Well Operations PBU J-30 Daily Report of Well Operations PBU J-30 9/3/2022 Prep for cement, ND adapter & dry ole tree, run 6 joints of used 3-1/2 VT tubing open hole with crane, land tubing with tubing hanger. NU adapter & dry hole tree, test tubing hanger to 5000 psi with no pressure loss (Pass) Joint 1, 31.5 ft - joint 2, 31.65 ft - joint 3, 31.2ft - joint 4, 31.5 ft - joint 5, 31.6ft - joint 6, 31.45 Tubing hanger pup 3.75ft = 192.65ft 9/6/2022 ** PLUG AND ABANDONMENT** Pump 20 bbls diesel down TBG taking returns up IA to OTT. 2 bpm at 100 psi. All valves shut in upon departure. FWHP's = 0/0 9/10/2022 Job Scope: P&A Halliburton cement pump/place 15.8ppg class G cement to surface on TBG and IA. Total of 25bbls pumped with 10bbls excess to surface. **Job Complete** 11/19/2022 ** P&A in progress**. Pad elevation = 39.4'. Tundra elevation = 34.3'. Started to excavate around well and uncovered a sealed cellar. Unable to remove cellar with excavtor. Will have to return with welders to cut box. Job in progress. 11/20/2022 ** P&A in progress**. Used a jackhammer and supersucker to remove cement from the inside of sealed cellar. Welders cut cellar box from around the conductor and made a cut splitting the cellar in half. Still unable to remove using the excavator. Welders will return the next day with different cutting options. Job in progress. 11/21/2022 ** P&A in progress**.Cut a window out of the side and out of the floor of the sealed cellar to reveal the structure. Decided to build a hooch around cellar due to weather conditions and the weld shop will return tomorrow with different cutting options.. Job in progress. 11/22/2022 ** P&A inprogress**. Welders were successful cutting cellar box out from arround conductor. Continue with excavting from around well. Job in progress. 11/23/2022 ** P&A in progress**. Finished excavating down to 14.5'. Set the shoring box, placed rig mats and baricades arround excavation. Job in progress. 11/24/2022 ** P&A in progress**. After the confined space meeting the crew was able to enter the shoring box and measure the insulated conductor at 34" OD. Unable to rig the saw up becasue the insulated conductor was to large for the saw. WIll need to cut a window in the insulated conductor to fit the saw.. Job in progress. 11/25/2022 ** P&A in progress**. The weld shop cut a 36" window out of the conductor to fit the saw. After exposing the inside of the insulated condutor we found 3" of insulation with a 3" ice lens between the insulation and the outer conductor. Decided to wrap and heat the conductor overnight to thaw the ice to prevent the posibility of it falling out of the conductor during the cut. Job in progress. 11/26/2022 ** P&A in progress**. During the excavation there was a definate tundra line 6.5' below pad grad. Made cut line on conductor 10' below pad grade. Cut conductor and casing off 42" below tundra elevation, with a good cement top. Made notification to the AOGCC. Documented with pictures. Job in progress. 11/27/2022 **P&A in progress**.Cement top and marker plate was whitnessed by AOGCC inspector Kam St. John. Welded a 34' plate to the 34' conductor and tacked the 20" marker plate that was previously made to the 34" . Sent photos of the welded marker plate to the 34" conductor to Kam St. John, GPS coordinates = 70.32682, - 148.84246. Pictures taken of cut depth, cement top and marker plate for documetaion. Job in progress. 11/28/2022 ** P&A Complete**. Remove rig mats and pull shoring box. Back fill excavation and place delineators. Job Complete. 2022-1127_Surface_Abandon_PBU_J-30_ksj Page 1 of 3 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: November 29, 2022 P. I. Supervisor FROM: Kam StJohn SUBJECT: Surface Abandonment Petroleum Inspector PBU J-30 Hilcorp North Slope LLC PTD 2140750; Sundry 322-375 11/27/2022: I traveled to PBU J-pad for the surface abandonment inspection of Well J- 30. Jaycen Sala was the Hilcorp representative on site. The well was cut at 3.5 feet below original tundra level which his 0.5 feet deeper than required by regulation. The 3 ½-inch tubing string was used to circulate cement to surface (and therefore cemented in place). The marker plate had the correct information – installed after confirming the cut- off depth and good cement to surface. Attachments: Photos (3) 9 9 9 9 James B. Regg Digitally signed by James B. Regg Date: 2023.04.12 16:38:54 -08'00' 2022-1127_Surface_Abandon_PBU_J-30_ksj Page 2 of 3 Surface Abandonment – PBU J-30 (PTD 2140750) Photos by AOGCC Inspector K. StJohn 11/27/2022 Cutoff casings and tubing with cement to surface. Outer pipe is insulated 30” x 20” conductor Marker plate 2022-1127_Surface_Abandon_PBU_J-30_ksj Page 3 of 3 Smaller marker plate welded to larger plate covering the 30” x 20” insulated conductor MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Monday, August 29, 2022 SUBJECT:Mechanical Integrity Tests TO: FROM:Bob Noble P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC J-30 PRUDHOE BAY UNIT J-30 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 08/29/2022 J-30 50-029-23515-00-00 214-075-0 N SPT2140750 OTHER P Bob Noble 7/25/2022 Casing shoe test. No tubing. MIT of 9 5/8" to 1500 psi per Sundry 322-375 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT J-30 Inspection Date: Tubing OA Packer Depth 0 1717 1695 1689IA 45 Min 60 Min Rel Insp Num: Insp Num:mitRCN220725150112 BBL Pumped:1 BBL Returned:1 Monday, August 29, 2022 Page 1 of 1 9 9 9 9 9 9 9 9 6XVSHQGHGRLOSURGXFHU James B. Regg Digitally signed by James B. Regg Date: 2022.08.29 11:54:23 -08'00' ,ISHUIRUDWLQJ 7\SHRI5HTXHVW 2SHUDWRU1DPH $GGUHVV &XUUHQW:HOO&ODVV3HUPLWWR'ULOO1XPEHU $3,1XPEHU :HOO1DPHDQG1XPEHU 3URSHUW\'HVLJQDWLRQ/HDVH1XPEHU)LHOG3RROV $EDQGRQ 6XVSHQG 3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO 3HUIRUDWH 3OXJ3HUIRUDWLRQV 5HHQWHU6XVS:HOO 2WKHU6WLPXODWH )UDFWXUH6WLPXODWH $OWHU&DVLQJ 3XOO7XELQJ 5HSDLU:HOO 2WKHU &KDQJH$SSURYHG3URJUDP 2SHUDWLRQVVKXWGRZQ :KDW5HJXODWLRQRU&RQVHUYDWLRQ2UGHUJRYHUQVZHOOVSDFLQJLQWKHVSRRO" :LOOSODQQHGSHUIRUDWLRQVUHTXLUHDVSDFLQJH[FHSWLRQ"<HV 1R 7RWDO'HSWK0'IW 7RWDO'HSWK79'IW (IIHFWLYH'HSWK0' (IIHFWLYH'HSWK79' 0363SVL 3OXJV0' -XQN0' 35(6(17:(//&21',7,216800$5< 3HUIRUDWLRQ'HSWK0'IW 3HUIRUDWLRQ'HSWK79'IW7XELQJ6L]H 7XELQJ*UDGH 7XELQJ0'IW 3DFNHUVDQG66697\SH3DFNHUVDQG66690'IWDQG79'IW &DVLQJ /HQJWK 6L]H 0' 79' %XUVW &ROODSVH ([SORUDWRU\ 6WUDWLJUDSKLF 'HYHORSPHQW 6HUYLFH $WWDFKPHQWV (VWLPDWHG'DWHIRU &RPPHQFLQJ2SHUDWLRQV :HOO&ODVVDIWHUSURSRVHGZRUN :HOO6WDWXVDIWHUSURSRVHGZRUN 9HUEDO$SSURYDO ,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEHGHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURFDO 3URSRVDO6XPPDU\:HOOERUHVFKHPDWLF %236NHWFK'HWDLOHG2SHUDWLRQV3URJUDP 2,/ *$6 :,1- :$* *,1- :'63/ *6725 2S6KXWGRZQ 6XVSHQGHG 63/8* $EDQGRQHG 6HUYLFH'HYHORSPHQW6WUDVWLJUDSKLF([SORUDWRU\ $XWKRUL]HG1DPHDQG 'LJLWDO6LJQDWXUHZLWK'DWH $XWKRUL]HG7LWOH &RQWDFW1DPH &RQWDFW(PDLO &RQWDFW3KRQH $2*&&86(21/< &RPPLVVLRQ5HSUHVHQWDWLYH &RQGLWLRQVRIDSSURYDO1RWLI\&RPPLVVLRQVRWKDWDUHSUHVHQWDWLYHPD\ZLWQHVV 6XQGU\1XPEHU /RFDWLRQ&OHDUDQFH0HFKDQLFDO,QWHJULW\7HVW%237HVW3OXJ,QWHJULW\ 2WKHU 3RVW,QLWLDO,QMHFWLRQ0,75HT G" 6SDFLQJ([FHSWLRQ5HTXLUHG"<HV <HV 1R 1R 6XEVHTXHQW)RUP5HTXLUHG $SSURYHG%\'DWH $33529('%< 7+($2*&&&200,66,21(5 3%8- +LOFRUS1RUWK6ORSH//& &HQWHUSRLQW'U6XLWH $QFKRUDJH$. - $'/ &RQGXFWRU 6XUIDFH ,QWHUPHGLDWH 3URGXFWLRQ /LQHU 1RQH 1RQH 1RQH 1RQH 1$ 1$1RQH 6WUXFWXUDO 1R3DFNHU 1R6669,QVWDOOHG 1R3DFNHU 1R6669,QVWDOOHG 'DWH 6WDQ*ROLV 6U$UHD2SHUDWLRQV0DQDJHU :\DWW5LYDUG ZULYDUG#KLOFRUSFRP 358'+2(%$<358'+2(2,/ 67$7(2)$/$6.$ $/$6.$2,/$1'*$6&216(59$7,21&200,66,21 $33/,&$7,21)25681'5<$33529$/6 $$& &RPP &RPP6U3HW(QJ 6U3HW*HR 6U5HV(QJ )RUP5HYLVHG$SSURYHGDSSOLFDWLRQLVYDOLGIRUPRQWKVIURPWKHGDWHRIDSSURYDO By Samantha Carlisle at 8:38 am, Jun 29, 2022 'LJLWDOO\VLJQHGE\6WDQ*ROLV '1FQ 6WDQ*ROLV RX 8VHUV 'DWH 6WDQ*ROLV '65 ; '/% $2*&&WRZLWQHVV0,7RQFDVLQJFHPHQWHGVKRHWRSVL 3KRWRGRFXPHQWDVGHVFULEHG 0*5-8/< GWV -/& Jeremy Price Digitally signed by Jeremy Price Date: 2022.07.11 15:37:32 -08'00' RBDMS JSB 071222 tĞůůWƌŽŐŶŽƐŝƐ tĞůů͗ :ͲϯϬ ĂƚĞ͗ ϲͬϮϭͬϮϬϮϮ tĞůůEĂŵĞ͗:ͲϯϬ W/EƵŵďĞƌ͗ϱϬͲϬϮϵͲϮϯϱϭϱͲϬϬ ƵƌƌĞŶƚ^ƚĂƚƵƐ͗^ƵƐƉĞŶĚĞĚtĞůů WĂĚ͗Wh :ͲWĂĚ ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗:ƵůLJ ϮϬ ƚŚ ϮϬϮϮ ZŝŐ͗^>͕>ĂŶĚĞŵĞŶƚĞƌƐ ZĞŐƵůĂƚŽƌLJŽŶƚĂĐƚ͗ďďŝĞĂƌŬĞƌ WĞƌŵŝƚƚŽƌŝůůEƵŵďĞƌ͗ϮϭϰͲϬϳϱ &ŝƌƐƚĂůů ŶŐŝŶĞĞƌ͗tLJĂƚƚZŝǀĂƌĚ ;ϵϬϳͿϳϳϳͲϴϱϰϳ;KͿ ;ϱϬϵͿϲϳϬͲϴϬϬϭ;DͿ ^ĞĐŽŶĚĂůůŶŐŝŶĞĞƌ͗ƌŽĚŝĞtĂŐĞƐ ;ϵϬϳͿ ϱϲϰͲϱϬϬϲ ;KͿ ;ϳϭϯͿ ϯϴϬͲϵϴϯϲ ;DͿ &EƵŵďĞƌ͗ϮϮϱͲϬϬϲϮϳ :ŽďdLJƉĞ͗^ƵƌĨĂĐĞďĂŶĚŽŶ ƵƌƌĞŶƚŽƚƚŽŵ,ŽůĞWƌĞƐƐƵƌĞ͗ϭϭϯϮ ƉƐŝΛ ϮϱϵϬ͛ ds ;Wd^ƵƌĨĂĐĞ,ŽůĞ Dtс ϴ͘ϰ ƉƉŐͿ DĂdžŝŵƵŵ džƉĞĐƚĞĚ,W͗ϭϭϰϱ ƉƐŝΛ ϮϱϵϬ͛ds ;Wd^ƵƌĨĂĐĞ,ŽůĞ DĂdžDtсϴ͘ϱƉƉŐͿ DĂdž͘ŶƚŝĐŝƉĂƚĞĚ^ƵƌĨĂĐĞWƌĞƐƐ͗ϴϴϲ ƉƐŝ ;Ϭ͘ϭ ƉƐŝͬĨƚ ŐĂƐŐƌĂĚŝĞŶƚͿ ZĞĐĞŶƚ^ŚƵƚͲŝŶ^ƵƌĨĂĐĞWƌĞƐƐ͗ϬƉƐŝ ;dĂŬĞŶ ϲͬϵͬϮϬͿ DŝŶ/͗ϴ͘ϴϭ͟ dDŽůůĂƌ Λ ϰϳϴ͛ D DĂdžŶŐůĞ͗ϭϭ ĞŐΛ ϮϮϴϵ D ZĞĨĞƌĞŶĐĞ>ŽŐ͗ĂƐŝŶŐdĂůůLJĚĂƚĞĚϳͲϭϱͲϭϰ ƌŝĞĨtĞůů^ƵŵŵĂƌLJ :ͲϯϬŝƐĂƐƵƐƉĞŶĚĞĚƐƵƌĨĂĐĞŚŽůĞ ĚƌŝůůĞĚŝŶ:ƵůLJϮϬϭϰ͘dŚĞϵͲϱͬϴ͟ ƐƵƌĨĂĐĞ ĐĂƐŝŶŐǁĂƐĐĞŵĞŶƚĞĚƚŽƐƵƌĨĂĐĞďƵƚ ƐŚŽƌƚůLJĂĨƚĞƌĐĞŵĞŶƚŝŶŐ͕ƚŚĞǁĞůůĞdžƉĞƌŝĞŶĐĞĚƐŝŐŶŝĨŝĐĂŶƚĨƌĞƐŚǁĂƚĞƌŝŶĨůŽǁƵƉƚŚĞďĂĐŬƐŝĚĞŽĨƚŚĞƐƵƌĨĂĐĞĐĂƐŝŶŐ͘ t&>ŝŶĚŝĐĂƚĞĚǁĂƚĞƌĨůŽǁŝŶŐƵƉĨƌŽŵĂƚůĞĂƐƚΕϱϬϬ͛D͘ tĂƚĞƌĞǀĞŶƚƵĂůůLJƐƵďƐŝĚĞĚĂŶĚƐƵďƐĞƋƵĞŶƚ>ƐŚŽǁĞĚ ŵŝŶŝŵĂůĐĞŵĞŶƚ ĂďŽǀĞΕϳϬϬ͛D͘ tŝƚŚƉŽŽƌƐƵƌĨĂĐĞĐĂƐŝŶŐĐĞŵĞŶƚ͕:ͲϯϬŚĂƐŶŽƵƚŝůŝƚLJĨŽƌĨƵƚƵƌĞĚƌŝůůŝŶŐ͘'ŽŝŶŐĨŽƌǁĂƌĚƚŚĞǁĞůů͛ƐƐƵƌĨĂĐĞŚŽůĞǁŝůů ďĞWΘ͛Ě͘ KďũĞĐƚŝǀĞ͗ WΘǁĞůů͛ƐƐƵƌĨĂĐĞŚŽůĞƚŽĨŝŶĂůŝnjĞǁĞůůĂďĂŶĚŽŶŵĞŶƚĂŶĚƌĞĐŽǀĞƌǁĞůůƐůŽƚĨŽƌĨƵƚƵƌĞĚƌŝůůŝŶŐ EŽƚĞƐŽŶ tĞůůďŽƌĞŽŶĚŝƚŝŽŶ Ͳ ϵͲϱͬϴ͟^ƵƌĨĂĐĞĂƐŝŶŐǁĂƐŚƵŶŐŽĨĨϮϬ͟ĐŽŶĚƵĐƚŽƌďƵƚ ƉĂĐŬŽĨĨǁĂƐ ŶĞǀĞƌƌƵŶ͘/ŶƐƚĞĂĚ͕ƐƚĂƌƚĞƌƐƉŽŽůǁĂƐ ĨůĂŶŐĞĚĚŝƌĞĐƚůLJƚŽƚŚĞĐŽŶĚƵĐƚŽƌůĞĂǀŝŶŐƚŚĞϵͲϱͬϴ͟ƐƵƌĨĂĐĞĐĂƐŝŶŐ͕ϮϬ͟ĐŽŶĚƵĐƚŽƌĂŶĚĂůů ĚƌLJŚŽůĞ ƚƌĞĞ ǀĂůǀĞƐŝŶĐŽŵŵƵŶŝĐĂƚŝŽŶ͘ Ͳ &ŽƌƚŚŝƐƌĞĂƐŽŶ͕ƉƌĞƐƐƵƌĞƐƐŚŽƵůĚŶŽƚďĞĂƉƉůŝĞĚƚŽƚŚĞǁĞůůŚĞĂĚͬĐĂƐŝŶŐƵŶƚŝůŝƐŽůĂƚŝŽŶŝƐĞƐƚĂďůŝƐŚĞĚǁŝƚŚŝŶ ƚŚĞϵͲϱͬϴ͟ĐĂƐŝŶŐ ƚŽĂǀŽŝĚďƌŽĂĐŚŝŶŐĨƌŽŵĐŽŶĚƵĐƚŽƌƐŚŽĞĂƚ ΕϭϯϬ͛͘ Ͳ /ŶŝƚŝĂůEŽĨĚƌLJŚŽůĞƚƌĞĞ͕ƐůŝĐŬůŝŶĞĚƌŝĨƚ͕ ĞůŝŶĞ/W ĂŶĚĐĞŵĞŶƚƐƚƌŝŶŐĚĞƉůŽLJŵĞŶƚ ;ƚŚƌŽƵŐŚƐƚĞƉηϭϴ ďĞůŽǁͿǁŝůůďĞƉĞƌĨŽƌŵĞĚŽƉĞŶŚŽůĞ͘dŚĞƚǁŽďĂƌƌŝĞƌƐĨŽƌƚŚĞƐĞŽƉĞƌĂƚŝŽŶƐĂƌĞ͘ o ^ƵƌĨĂĐĞŚŽůĞŽŶůLJ͕ĚŽĞƐŶŽƚĞdžƚĞŶĚƚŽ Žƌ ĐŽŶŶĞĐƚǁŝƚŚĂŶLJƌĞƐĞƌǀŽŝƌ͘ o tĞůůďŽƌĞĨƵůůŽĨϵ͘ϴƉƉŐŬŝůůǁĞŝŐŚƚďƌŝŶĞ ^ƵŶĚƌLJWƌŽĐĞĚƵƌĞ , ϭ͘ sĞƌŝĨLJϬƉƐŝŽŶĚƌLJŚŽůĞƚƌĞĞ͘dƌĞĞĂŶĚĂĚĂƉƚĞƌƌĞŵŽǀĂůǁŝůůďĞƉĞƌĨŽƌŵĞĚŽƉĞŶŚŽůĞ͘ Ϯ͘ E ϰ͟ dƌĞĞĂŶĚ ϮϭͲϭͬϰ͟džϭϭ͟ ƚƵďŝŶŐŚĞĂĚĂĚĂƉƚĞƌ͘ ϯ͘ EhϵͲϱͬϴdžϭϭ͛͟ ĐĂƐŝŶŐƐƉŽŽů͘KŶĐĞƚŚĞĐĂƐŝŶŐƐƉŽŽůŝƐŝŶƉůĂĐĞĂŶĚƚĞƐƚĞĚ͕ϵͲϱͬϴ͟ĐĂƐŝŶŐǁŝůůďĞŝƐŽůĂƚĞĚ ĨƌŽŵƚŚĞĐŽŶĚƵĐƚŽƌĂŶĚƉƌĞƐƐƵƌĞĐĂŶďĞĂƉƉůŝĞĚŝŶƐŝĚĞƚŚĞĐĂƐŝŶŐ͘ ϰ͘ Ehd,ĂŶĚĚƌLJŚŽůĞƚƌĞĞ͘ ϱ͘ D/dͲdƚŚĞƐƵƌĨĂĐĞĐĂƐŝŶŐƚŽϭϱϬϬƉƐŝ ;ĐŚĂƌƚĞĚͿ͘ ůĞĞĚďĂĐŬƚŽϬƉƐŝ͘ '/% KRXUQRWLFHIRU$2*&&WRZLWQHVVSUHVVXUHWHVW tĞůůWƌŽŐŶŽƐŝƐ tĞůů͗ :ͲϯϬ ĂƚĞ͗ ϲͬϮϭͬϮϬϮϮ ϲ͘ EƚŚĞd,ĂŶĚĚƌLJŚŽůĞƚƌĞĞƚŽůĞĂǀĞƐƵĨĨŝĐŝĞŶƚ/ĨŽƌ ϵͲϱͬϴ͟ ^>ͬ>WůƵŐƐ ϳ͘ ZDK ^ůŝĐŬůŝŶĞ EŽƚĞ͗,ĂǀĞsĂĐƚƌƵĐŬŽŶƐŝƚĞĂŶĚďĞƉƌĞƉĂƌĞĚƚŽƚĂŬĞĨůƵŝĚƌĞƚƵƌŶƐ ĚƵĞƚŽǁŝƌĞĚŝƐƉůĂĐĞŵĞŶƚ ϴ͘ D/Zh ^>͘ƌŝĨƚǁŝůůďĞƉĞƌĨŽƌŵĞĚŽƉĞŶŚŽůĞ͘ ϵ͘ DhĂŶĚ ĚƌŝĨƚĨŽƌϵͲϱͬϴ͟/WƚŽΕϯϬϬ͛D ϭϬ͘ ZDK ůŝŶĞ EŽƚĞ͗,ĂǀĞsĂĐƚƌƵĐŬŽŶƐŝƚĞĂŶĚďĞƉƌĞƉĂƌĞĚƚŽƚĂŬĞĨůƵŝĚƌĞƚƵƌŶƐ ĚƵĞƚŽǁŝƌĞĚŝƐƉůĂĐĞŵĞŶƚ ϭϭ͘ D/Zh>͘ /WǁŝůůďĞƐĞƚŽƉĞŶŚŽůĞ͘ ϭϮ͘ DhϵͲϱͬϴ͟/W͕Z/,ĂŶĚƐĞƚŵŝĚũŽŝŶƚĂƚΕϮϲϬ͛D͘ Ă͘ ŽƌƌĞůĂƚĞƚŽĐĂƐŝŶŐƚĂůůLJĚĂƚĞĚϳͲϭϱͲϭϰ ď͘ dĂŐƚŽĐŽŶĨŝƌŵƉŽƐƚƐĞƚ͘ ϭϯ͘ ZDK ƌĂŶĞͬŽŽŵƚƌƵĐŬ Θ&ƵůůďŽƌĞ ϭϰ͘ D/Zh ŽŽŵƚƌƵĐŬͬĐƌĂŶĞĂŶĚƐƉŽƚĂŶĐŝůůĂƌLJĞƋƵŝƉŵĞŶƚ͘ ϭϱ͘ sĞƌŝĨLJϬƉƐŝŽŶƚŚĞǁĞůů͘ ϭϲ͘ ^ĂĐƌŝĨŝĐŝĂůWΘƐƚƌŝŶŐǁŝůůďĞĚĞƉůŽLJĞĚŽƉĞŶŚŽůĞǀŝĂĐƌĂŶĞͬŵƚƌƵĐŬ͘ ϭϳ͘ ĞƉůŽLJ Εϲ ũƚƐ;Εϭϴϲ ĨƚͿ ƌĂŶŐĞϮ ĐŽŶĚŝƚŝŽŶƚƵďŝŶŐĂƐƐĂĐƌŝĨŝĐŝĂů ĐĞŵĞŶƚŝŶŐƐƚƌŝŶŐ͘ Ă͘ tŝƚŚнϰϳ͛KZ<ĐŽƌƌĞĐƚŝŽŶ͕ƚŚŝƐƉůĂĐĞƐ ĐĞŵĞŶƚƐƚƌŝŶŐ ƚƵďŝŶŐƚĂŝůĂƚΕϮϯϯ͛D͘ ϭϴ͘ >ĂŶĚĐĞŵĞŶƚƐƚƌŝŶŐŽŶƚƵďŝŶŐ ŚĂŶŐĞƌ ϭϵ͘ Ehd,ĂŶĚĚƌLJŚŽůĞƚƌĞĞ ĂŶĚƚĞƐƚ͘ ϮϬ͘ D/Zh ĨƵůůďŽƌĞ ĂŶĚWdĂŐĂŝŶƐƚĚƌLJŚŽůĞƚƌĞĞ͘ Ϯϭ͘ ŽŶĨŝƌŵŐŽŽĚ ĐŝƌĐƵůĂƚŝŽŶ ĚŽǁŶƚŚĞ ĐĞŵĞŶƚŝŶŐƐƚƌŝŶŐ ĂŶĚƵƉƚŚĞ/ĂƚΕϯWD͘ Ă͘ &WǁĞůůĂƚt^>ĚŝƐĐƌĞƚŝŽŶĚĞƉĞŶĚŝŶŐŽŶƚŚĞƚŝŵŝŶŐŽĨĐĞŵĞŶƚĞƌ Ɛ͘ ϮϮ͘ ^ŚƵƚ ĚƌLJŚŽůĞ ƚƌĞĞǀĂůǀĞƐĂŶĚZDK ĞŵĞŶƚĞƌƐ Ϯϯ͘ D/Zh ĞŵĞŶƚĞƌƐ ĂŶĚWdĂŐĂŝŶƐƚĚƌLJŚŽůĞ ƚƌĞĞ͘ Ϯϰ͘ ŽŶĨŝƌŵŐŽŽĚĐŝƌĐƵůĂƚŝŽŶĚŽǁŶƚŚĞĐĞŵĞŶƚŝŶŐƐƚƌŝŶŐĂŶĚƵƉƚŚĞ/ĂƚΕϯWD͘ Ă͘ ŝƌĐƵůĂƚĞŽƵƚĨƌĞĞnjĞƉƌŽƚĞĐƚŝĨ&W͛ĚƉƌĞǀŝŽƵƐůLJ͘ Ϯϱ͘ WĞƌĨŽƌŵĐĞŵĞŶƚũŽďĚŽǁŶƚŚĞ ĐĞŵĞŶƚƐƚƌŝŶŐ ƚĂŬŝŶŐƌĞƚƵƌŶƐƵƉƚŚĞ/͘ Ă͘ dĂŬĞƌĞƚƵƌŶƐĨƌŽŵƚŚĞ/ĂŶĚƉƵŵƉƵŶƚŝůĐůĞĂŶĐĞŵĞŶƚĂƚ ƐƵƌĨĂĐĞ͘dĂŬĞĂŶĂĚĚŝƚŝŽŶĂů ϭϬ ďďůƐƚŽŐĞƚƋƵĂůŝƚLJĐĞŵĞŶƚĂƚƐƵƌĨĂĐĞŝŶ/͘ ď͘ ^/ƚƵďŝŶŐĂŶĚ/͘ Đ͘ džƉĞĐƚĞĚĞŵĞŶƚsŽůƵŵĞ͗ΕϮϱ ďďůƐ ŝ͘ ϮͲϳͬϴ͟ dƵďŝŶŐ͗ΕϭϵϬ͛;ďĞůŽǁŚĂŶŐĞƌͿy͘ϬϬϱϴďƉĨсϭ͘ϭďďůƐ ŝŝ͘ ϮͲϳͬϴ͟ /͗ΕϭϵϬ͛dž͘ϬϲϳϳϵďƉĨсϭϮ͘ϵďďůƐ ŝŝŝ͘ ĚũƵƐƚǀŽůƵŵĞƐŝĨϯͲϭͬϮ͟ ŽƌϰͲϭͬϮ͟ƐƚƌŝŶŐƐƌƵŶŝŶƐƚĞĂĚŽĨϮͲϳͬϴ͘͟ Ϯϲ͘ &ůƵƐŚĂĐƌŽƐƐƚŚĞƚƌĞĞĂƐŶĞĞĚĞĚƚŽĐůĞĂŶƵƉĐĞŵĞŶƚƌĞƚƵƌŶƐĂŶĚŵĂŝŶƚĂŝŶƚƌĞĞͬǀĂůǀĞĨƵŶĐƚŝŽŶ Ϯϳ͘ ZDK džĐĂǀĂƚŝŽŶĂŶĚƵƚŽĨĨ͗ Ϯϴ͘ EŽƚŝĨLJK'ŝŶƐƉĞĐƚŽƌƐϮϰŚƌƐ ƉƌŝŽƌƚŽĐƵƚŽĨĨŽĨǁĞůůŚĞĂĚĂŶĚǁĞůĚŝŶŐŵĂƌŬĞƌƉůĂƚĞ͘ Ϯϵ͘ EŝƉƉůĞĚŽǁŶǁĞůůŚĞĂĚĂŶĚƐĂǀĞĨŽƌƌĞͲƵƐĞ͘ ϯϬ͘ džĐĂǀĂƚĞĂƌŽƵŶĚ ǁĞůůŚĞĂĚ͘ tĞůůWƌŽŐŶŽƐŝƐ tĞůů͗ :ͲϯϬ ĂƚĞ͗ ϲͬϮϭͬϮϬϮϮ ϯϭ͘ ƵƚŽĨĨĐĂƐŝŶŐϯ͛ďĞůŽǁƚƵŶĚƌĂůĞǀĞů͘ Ă͘ /ĨĐĞŵĞŶƚĨĞůůďĂĐŬ͕ďƌŝŶŐĐĞŵĞŶƚƚŽƉƚŽůĞǀĞůŽĨĐƵƚ͘ ϯϮ͘ WŚŽƚŽŐƌĂƉŚĐĂƐŝŶŐƐƚƵďďĞĨŽƌĞƐĞƚƚŝŶŐŵĂƌŬĞƌƉůĂƚĞ͘ ϯϯ͘ ^ĞƚŵĂƌŬĞƌƉůĂƚĞ͕ĐŽůůĞĐƚ'W^ĐŽŽƌĚŝŶĂƚĞƐ͘ ϯϰ͘ WŚŽƚŽŐƌĂƉŚĐĂƐŝŶŐƐƚƵďĂĨƚĞƌƐĞƚƚŝŶŐŵĂƌŬĞƌƉůĂƚĞ͘ ϯϱ͘ ĂĐŬĨŝůůĞdžĐĂǀĂƚŝŽŶ͕ĐůŽƐĞŽƵƚůŽĐĂƚŝŽŶ͘ ƚƚĂĐŚŵĞŶƚƐ͗ ϭ͘ ƐͲďƵŝůƚ^ĐŚĞŵĂƚŝĐ Ϯ͘ WƌŽƉŽƐĞĚ^ĐŚĞŵĂƚŝĐ ϯ͘ DĂƌŬĞƌWůĂƚĞ $2*&&WRZLWQHVVFHPHQWWRSLQDOODQQXOLEHIRUHJURXWLQJ 3KRWRJUDSKDQQXOLEHIRUHJURXWLQJDQGDIWHUJURXWLQJ 6XUIDFH&HPHQW3OXJ &,%3 0' 3HUIV 0' 352326(' &HPHQW6WULQJ 0' 3%8 - $EDQGRQPHQW0DUNHU3ODWH RULJLQDOJURXQG WXQGUD OHYHO ó´7KLFNSODWH &XWFDVLQJDWOHDVW¶EHORZ RULJLQDO JURXQG OHYHO ´'LDPHWHUSODWH 37' *UDYHOSDGOHYHOa¶DERYHRULJLQDOJURXQGOHYHO 3%8 - +LOFRUS1RUWK6ORSH//& $3, 37' +LOFRUS 1RUWK6ORSH//&+LOFRUS 1RUWK6ORSH//&Changes to Approved Work Over Sundry Procedure'DWH -XQH 6XEMHFW &KDQJHVWR$SSURYHG 6XQGU\3URFHGXUHIRU :HOO -6XQGU\ $Q\PRGLILFDWLRQVWR DQ DSSURYHGVXQGU\ ZLOOEHGRFXPHQWHGDQGDSSURYHGEHORZ &KDQJHVWRDQDSSURYHG VXQGU\ ZLOOEHFRPPXQLFDWHGWRWKH$2*&& E\WKH ZRUNRYHU:2³ILUVWFDOO´HQJLQHHU $2*&&ZULWWHQDSSURYDORIWKHFKDQJHLVUHTXLUHGEHIRUHLPSOHPHQWLQJWKHFKDQJH6WHS3DJH'DWH 3URFHGXUH&KDQJH+163UHSDUHG%\,QLWLDOV+16$SSURYHG%\,QLWLDOV$2*&&:ULWWHQ$SSURYDO5HFHLYHG3HUVRQDQG'DWH$SSURYDO$VVHW7HDP2SHUDWLRQV0DQDJHU 'DWH3UHSDUHG)LUVW&DOO 2SHUDWLRQV (QJLQHHU 'DWH Kaitlyn Barcelona Hilcorp North Slope, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 564-4389 E-mail: kaitlyn.barcelona@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal Received By: Date: DATE: 4/13/2022 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL J-30 (PTD 214-075) RST-WFL 7/18/2014 Please include current contact information if different from above. 214-075 T36474 Meredith Guhl Digitally signed by Meredith Guhl Date: 2022.04.13 14:58:35 -08'00' Operator Name:2. Development Exploratory Service 5 Permit to Drill Number:214-075 6.50-029-23515-00-00 PRUDHOE BAY, PRUDHOE OIL BP Exploration (Alaska), Inc 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 2698 2608 2587 None None None Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 48 - 128 48 - 128 1490 470 Surface 2647 9-5/8" 47 - 2694 47 - 2672 5750 3090 Intermediate Production Perforation Depth: Measured depth: None feet True vertical depth: feet Tubing (size, grade, measured and true vertical depth)None Packers and SSSV (type, measured and true vertical depth) None Liner 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Suspended Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Sternicki, Oliver R Oliver.Sternicki@bp.com Authorized Name:Lastufka, Joseph N Authorized Title: Authorized Signature with Date:Contact Phone:+1 907 564 4301 Treatment descriptions including volumes used and final pressure: 13. SIM Specialist Operations Performed1. Abandon Plug Perforations Fracture Stimulate Pull Tubing GSTOR WINJ WAG GINJ SUSP 5 SPLUG 16. Well Status after work:Oil Gas Exploratory Development 5 Stratigraphic 15. Well Class after work: Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured2676 Sundry Number or N/A if C.O. Exempt: N/A Junk Packer Printed and Electronic Fracture Stimulation Data 5 Suspend Inspection Operations shutdown Change Approved Program 5 Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well 3.Address: P.O. Box 196612 Anchorage, AK 99519-6612 7.Property Designation (Lease Number):ADL 028282 PBU J-30 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations By Jody Colombie at 3:08 pm, Jun 26, 2020 Joseph N Lastufka Digitally signed by Joseph N Lastufka Date: 2020.06.24 10:24:38 -08'00' SFD 7/2/2020RBDMS HEW 6/29/2020MGR26JUN20DSR-6/26/2020 ACTIVITYDATE SUMMARY 6/2/2020 T/I = LOTO/0. Temp = SI. Pre AOGCC SU Inspection. Dry hole tree. No flowlines. Area around well is dry and clear of debris. Floor kit and stainless tubing are laying inside the wellhouse. Cellar has plywood cover and snow in the cellar floor. Wellhouse ID sign is on wellhouse. SV = C. MV = LOTO C. IA = OTG. 15:45 6/9/2020 T/I = 0/0. Temp = SI. SU well inspection (AOGCC witnessed by Bob Noble). No flowline, scaffolding or AL. Dryhole tree installed. Pictures taken. SV, MV (LOTO) = C. IA = OTG. 0900. Daily Report of Well Operations PBU J-30 Suspended Well Site Inspection Form Notify AOGCC Inspectors at least 10 days prior to inspection to allow witness Well Name: Prudhoe Bay Unit J-30 Field/Pool: Prudhoe Bay / Prudhoe Oil Permit # (PTD): 2140750 API Number: Operator: BP EXPLORATION (ALASKA) INC Date Suspended: 11/17/2015 Surface Location: Section: 9 Twsp: T11N Range: 13E Nearest active pad or road: J Pad Take to Location Digital camera Map showing well location /Aerial photos Brief well history Wellbore diagram showing downhole condition Latest Sundry or Completion report Past Site Visit documentation Site clearance documentation Pressure gauges, fittings, tools Sample containers for fluids on or near pad Condition of Surface Location AOGCC requires: 1) a description of the condition of the surface location, including discoloration, fluids or sheens visible on the ground or in any nearby water, 2) photographs showing the condition of the location surrounding the well General location condition: OK Pad or location surface: OK Location cleanup needed: None Pits condition: OK Surrounding area condition: OK Water/fluids on pad: None Discoloration, Sheens on pad, pits or water: None Samples taken: None Access road condition: Good Photographs taken (# and description): See Folder Condition of Wellhead AOGCC requires: 1) a description of the condition of the wellhead, 2) well pressure readings, where practicable, 3) photographs showing the wellhead condition Wellhead/tree/valve description, condition: See Pictures in Folder Cellar description, condition, fluids: Gravel / Snowmelt. Wood boards covering cellar. Rat Hole: Wellhouse or protective barriers: Yes Well identification sign: Yes Tubing Pressure (or casing if no tubing): 0 Annulus pressures: 0 / 0 Wellhead Photos taken (# and description): See Folder Work Required: None Operator Rep (name and signature): Ryan Moore AOGCC Inspector: Bob Noble Other Observers: Randy Mork / Jeff Curren Inspection Date: 6/9/2020 AOGCC Notice Date: 6/8/2020 Time of arrival: 9:00 AM Time of Departure: 9:10 AM Site access method: Truck 500292351500 Re-Inspection Suspended Well Inspection Review Report InspectNo: susRCN200609161810 Date Inspected: 6/9/2020 Inspector: Bob Noble Type of Inspection: Subsequent Well Name: PRUDHOE BAY UNITJ-30 Date AOGCC Notified: 6/7/2020 Permit Number: 2140750 Operator: BP Exploration (Alaska) Inc. Suspension Approval: Sundry H 315-423 Operator Rep: Ryan Moore Suspension Date: 8/6/2015 Wellbore Diagram Avail? O Location Verified? W Photos Taken? rVI If Verified, How? Other (specify in comments) Offshore? ❑ Well Pressures (psi): Tubing: 0 Fluid in Cellar? ❑ IA: 0 BPV Installed? ❑ OA: VR Plug(s) Installed? ❑ Wellhead Condition Wellheaad protected with a wellhouse. Well did not have an OA. Condition of Cellar Good and dry Surrounding Surface Condition Good dry gravel. ' Comments Location verfied with a pad map. ' Supervisor Comments Photos (2) j Friday, June 19, 2020 0 0 N O AOD F OD r vl � O � U M Z O 0 Q Z N m wZ i U o U O ) N Q U °U C7 CO DU no N N O. (� o N VA OQ a - coo U b p • a/ o • O o O ', . C_ E N = 9 _ .O 0) O O _ M Z E II'� 0I Li' _ , _ a I C a)) C 7 N 0 N p �I 0 a �I a a ce O p >I :° a; w in E rn E w E 'N a co o 0 o O O o 0 0 in 0 • a YI E oI E UI E UI E c 0 ui E 0 E o E o E o z 2 Eo Ow 0 a) 0 a) 0 a) 0 F. m 0 U I o EI EI EI EI Q m a>W = ns a) UI a) UI a) UI a) o a it WI 7 2OI a riCo 2I Q 2I Q 2I a) m D) pI > 0 > p ] p VE _ Z U p o c m YI ui E ai NC ai YI ai YI ai NC ai NC ni NC a YI N .-E a 0 I- ILL 0 I.L F . I- Li: - LE t- CE H lL - 0) it H c)O o .- oO o E o0 o E v0 ()O 0 00 w 'E _I co 'E rn -E-I E 'E -I D) 'E_I E 'E_I 0 'E_I w 'E _1_1 .E_I w N rp co0) O O= m 2 a o= D) o= c? 2= 0) 21 -• 2= -0 O= m 21 ° Q to V a- c.) as• o E o°o ° o°o 0 0°0 ° �m o �m �m oma J _N OI Cp _N o m OI O a)OIJ _N OI O N OIJ N OI CD o N O O OI o IX Q E Wa)p ED c) WMJ WM 0) WcoJ CD 0, 0) WMJ W0)O WMJ O z w a O 0 Y 0 vr v v v v v v v v w m O N N N N N N N N N CO V N N N N N N N N N IX as Q) m 0) ^ Q� J p. 5�.. w W o m O0 Z g 0. c0 Qm — 0 7 m N N o 2Jo CL o E zi £ r go ca .1-ii= C a) N O W N a a) E a U -5 0 0E cocC c 7 O Q Z Z O M E uC. VS I— 7 O I— z 7 o d Z J 2 To COill 0 m N J u) ui O a) aa)) Cl)vp 0 N Q d o \ 11 0C Q a z OI a zd E 0 U o p E J R2 Z co - co a) a) a) a) a) a) (a co 3 co C E co co co co co co co 0 co N Z w6 f6 f0 (0 a7 a) @ @ (0 I,, y 0) _m O) •0) 0) Q) _m _O) 0) Cl p p p p p p p p p co p z c « al co 0) co co co 0) 0) 0) 0) ~ d 0 .. E r- r- r- N- r- N- N- N- N- NO Q O W O Z N N N N N N N N N 0 Q: I— .- w w Q O LL.17 o 0 co z w •� w •' LL O 01) D ' O o C En ", up N CL Z lLL CD L J G 0 0 0 0 U 0 0 0 0 - dp OI I- a m a):° a 0 O 0 0 0 0 0 0 0 O. W 0 1- 3 3 w W W W w w w W w • • o `o o • o O N O 0 • • z m co a x U 0 af6i m m m a C7 a coM 0) 0 0 cll >.. >. i. % 0J no '1 N SIJ •-scr v- OJ O a Z Z Z Z O -; i I O J O O O cd E L > > 0 ch 12 12 N n �c`lI � M a N U (n (n (n (n pap pap Wal 0 U 03 0 1 p EI c c c c Z E al E o. �I c .-1U -I -IQ_ z Y. 2I 21 21 21 S1 Q aa)cO(O@ aa) m of UI o1 y1 0 old < Q N m m m m m =U a -U a M y M a (7w M'p pp 1 1 1 1 W mD mD 4 CO 4 j)v 4 ) W 0 M M M r0) 0 a).1-1 a)SIJ ala al cro p_l •a Alii 0 (an -)�w : : 0 �o� a,o� m•o m 0 m e maa, a ZNYIa N N U) N �? =I �? 'I N�1 Na'I NLLI NJ co —Q �O o• v v it it U aU ��c DSU LLS LL2 LL2 LL2 c o 0003 o 0U 00 00 00 ao 0 C _I J C C C C O C c C(/) C co C U) C(/) O E W :o 0 2 m o 0 0 0 N.)WW0 0 IU1 0 IUI 0 1 0 1 0 1 0 I n o E g co tm_ v o OQ 0 w U w a 5a i)a OQ o a)OI= m m m m �_W a)OIm a)012 a).6 mU) a)u) a)U) �W 0 re Q W c+)6 W W W W N 2 W M a W c9)a_ W M W 2 W 2 DM NI 0 O �j v v v v v v v v v v v Qua N N N N N N_ N_ N N_ `c:; N_ A co 7 W N N N N O COO COO COO COO CO N Z N N NNNN W W cb0 V m d Z O cu c)co 0 re Qro ON 0 J 0. CL �° G ..- ',, O W N O y 55 r 0 N ON a cc o w U 0 o JN - 0 M OD O. O r z Z To N m Q o,m m C //m/� 0 w tR V/ Q 0 N Q a ° H °' Q 0 a Cl Z d UN E co co 3 z u) (I)) m CO m m m m m CO CO CO o) m t 0 N m CD CD CD 0 CD CO CO f6 CD to mN. I0 0 0 0 0 03 0 0 0 0 0 0 y c N I w° N m m N 2 o To w m N N 2 C 0 b b 0 0 J 6 0 6 E 0 0 J E 0 � > M M co co co co co co co co co oo co w W 1- O) 0) O) O) O) 0) 0) 0) 0) 0) 0) 0) 0) C 0 n N. h N- r- f` co 0o co co co co co W et v v v v v v v v v v v - ":1- n- N NNNNN N N NNNNN 0 0 NLU a m Z E E z E co co 0D co p CO d Q U • (" U U U U U U 0 0 0 0 0 0 0 o 0 0 0 d• 0Ia0 0 0 0 0 0 0 0 0 0 0 o d Z d a. 2 1 W W W W W J LU LU W LU LU W J 3 i i 0 of o 9 o r v oZ >- } ti M N N T 1 N CO CO b o O. f0 C t(1 m Q c- OZ Y. U a m, Q 2 2 a° U 0 d Z co i Q_ , Y co CO �` w ('� 1 d 13 J u) CO N p2 CO LL I 0Z Om o w a N li O 0• f6 a LL E i w w m o> a i Z m E J m 9: c ai 2 w O N M 44( 0 0) l6 N J Q ac J w ' E A O m 00 0 li o ii CD ON a E in Zrn c tO V tU o J 6 } E ICC Q ° 0. r @ 0 7 € I 1 ' o zco m C to m �► o m m o H E , ii .T. 3 COco MUJ O m c d CI VI CC cc d p co N c_ E. O. Q ° O. O f0 O1cT, ....... , ;Tt0 a5..0 I ° 3N N N d CLF. W m' V o w c m' Z c iv o w vQ o o a c-� N N d E O' o ° g ° af6i ai E ° E 2 o E d E E d a M 0 a 0 0 0 0 0 I STATE OF ALASKA OLASKA OIL AND GAS CONSERVATION COMMIS. REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:Suspend Well Inspection Q 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 214-075 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-23515-00-00 7. Property Designation(Lease Number): ADL q 282f3f 02..e.:2"- --,,( 8. Well Name and Number: PBU J-30 9. Logs(List logs and submit electronic and printed data per 20AAC25.071):,{ 10. Field/Pools: -.2.7 I PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 2698 feet Plugs measured feet true vertical 2676 feet Junk measured feet DEC 3 1 2015 Effective Depth: measured 2608 feet Packer measured feet true vertical 2587 feet Packer true vertical feet ,C Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"91.5#H-40 48-128 48-128 1490 470 Surface 2647 9-5/8"40#L-80 47-2694 47-2672 5750 3090 Intermediate Production Liner Perforation Depth: Measured depth: None feet True vertical depth: None feet Tubing(size,grade,measured and true vertical depth) Packers and SSSV(type,measured and true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations Q Exploratory ❑ Development Q Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 0 Gas 0 WDSPL ❑ Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG ❑ GINJ ❑ SUSP Q SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature C47t--- Phone +1 907 564 4424 Date 12/31/15 Form 10-404 Revised 5/2015 VTL '113 116 , `4 (l b RBDMS JAN 0 5 2016 Submit Original Only i • O _ F- OO _ Q UC (n 4) O N 0 C a) 4- 0_175 CO O CO 0 Z (0 Q CO0O C N NL L -a O 0 N (0 as Q .+C to a3 E a) § CCD N Q 0 o 0 0�)• w ~ O ci) c.) a o s= o u- "- 0 CO 5 c a D — .N a) a) co 0) Q .o >� (n .O U >_ U) -a -0U 0 0 co 0. ao c C7O D a) 0 O Q O N Q Q, L E C O U O — Q N U) Z 3 C D O N O U 0 � LT_ al C O 1.0 w } !n ~ co J 5 � N U S • Suspended Well Site Inspection Form Initial Notify AOGCC Inspectors at least 10 days prior to inspection to allow witness Well Name: PBU J-30 Field/Pool: Prudhoe Bay/Prudhoe Oil Permit#(PTD) 214-075 _ API Number: 50-029-23515-00-00 Operator: BP EXPLORATION (ALASKA)INC Date Suspended: 11/17/2015 Surface Location: Section: 9 Twsp: 11N Range: 13E Nearest active pad or road: J Pad, Spine Rd Take to Location Digital camera Map showing well location/Aerial photos Brief well history Wellbore diagram showing downhole condition Latest Sundry or Completion report Past Site Visit documentation Site clearance documentation Pressure gauges,fittings, tools Sample containers for fluids on or near pad Condition of Surface Location AOGCC requires: 1)a description of the condition of the surface location, including discoloration, fluids or sheens visible on the ground or in any nearby water, 2)photographs showing the condition of the location surrounding the well General location condition: Clean,active pad Pad or location surface: Snow, ice,gravel Location cleanup needed: none Pits condition: filled with snow Surrounding area condition: clean Water/fluids on pad: snow, ice Discoloration,Sheens on pad,pits or water: none Samples taken: none Access road condition: good Photographs taken (#and description): Well pad area,well house Condition of Wellhead AOGCC requires: 1)a description of the condition of the wellhead,2)well pressure readings,where practicable, 3)photographs showing the wellhead condition Wellhead/tree/valve description, condition: FMC diverter adapter x casin. spool x THA. CIW dry hole tree,all new Cellar description,condition,fluids: metal tube,gravel, snow, ice Rat Hole: N/A Wellhouse or protective barriers, yes,well house Well identification sign: Yes,correct Tubing Pressure(or casing if no tubing): 0 psi-casing Annulus pressures 0 psi conductor x surface casing Wellhead Photos taken(#and description): wellhead assembly and tree Work Required: none Operator Rep(name and signature). Whitney Pettus tZll4/jS' AOGCC Inspector: Bob Noble Other Obsetic R.a Hayes Inspection Date: 12/13/2015 _AOGCC Notice Date 12/10/2015 Time of arrival: 9:30 AM Time of Departure: 9:55 AM Site access method: Truck • • Cm "CI E rL d U LriI C Y - Q _ r po C7 '.cy a O �7C N • _ Y 7 N 0. W _ d --, _ i x vi }!1 _ _ _ _ _ _ C "s - 1_ _ o vi E. O RI Q) Q M a > > x u )13 0 —� d a i I I I I 7M TO Vi o•• 42 ••••• ® •�, • .k r,. j N a) tu in Q m .- o t J 0 a `o c m • MI • • 0 0 3 � a I c If w a m o 10 of a n N D n C T N C d� J O f0 N C C J / // N O u (0 N LSE ami a / c n / , N U 10 ( N o LU H O N N O N N e N / �� m ^ 0 =3 Aja, `fin ^^ .,�"'^'" a E. ryh w a m 0) I s4^ Cl. .I 0 4rn 6 a m �, ; , iis t. - � � ;��A stir � •, r :",,,,..:1,- k d {� ri ' I �y�4 .� 4}j.f F £fr{� Ae� u h ! ,, te','.;.11.'"i''''''' '''' ' ' T S w V z , . ry tt iYr PIPa �, Qx rXy� y '4 a 4 , ,, „„• 2 � \ .. y :. . :. . m • • \. / \ :y. \ , F ;. , i• :,,;.,:' r e a far a , N i3 ..; .. , .., ..,„, . , -'-', - ,!-L..,.:',,,,,`,..'7,.;4.!.:;,--”4.,,!..,';',:;,','44,,A.:;',%:..,'.:,•..1.1-:-: , ., ..* ., ,. .. , ,4 4, t , ,, : .,, ' ' ,:,0t' ,,,,,, ' t".',„,it,t.'4."4''''''g '''' ''..*:7'''t'"4;:1-''''''' \ , , - 0 - . ,, , ' . ..., .,.,, ' ' r * .... .,‘ , . .., .,.. _ ,, . a TREE= 4-1116'E RY HOLE • Wa.LFAE== J-3 0 SA NOTES: AVIATOR= 'MIALKB.ELE 85=4' SUSPENDED BF ELEV= thi KOP= i w* x � 478'(--{9-5/8"TAM PORT COLLAR ' 1 DatumAID= «., --- Datum TVD= 8800'SS he 20"X 30"NSUtATED CONDUCTOR, 80' *Ir.r. 215.5#,A-53,D=19.250" y; ,4-4 .4 w + ;* .t,i w fy w + t 1 w K t f� #'4.t P81 1-1 - - 2608' ` : .,,- .tp ri . o+ii 9-5/8"CSG,40#, L-80 BTC,D=8.835" — 2694' DATE REV BY COhr?VEN S DATE REV BY COMMENTS fS PRUDHOEBAY LNT 07/24/14 PKR 272 INITIAL(SUSPENDED) WELL: J-30 07/29/14 PJC DRLG HO CORRECTIONS PERIAT Na:1140750 API No: 50-029-23515-00 SEC 9,T11N,R13E,780'FNL&1246'FWL BP Exploration(Alaska) • • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Suspended Well Inspection Report Date Inspected: 12/13/15 Inspector: Bob Noble Operator: BPXA Well Name: PBU J-30 Oper.Rep: Ryan Hayes PTD No.: 2140750 Oper.Phone: 907-659-5766 Location Verified? Yes Oper.Email: an rv .hayest bp.com If Verified,How? Other(specify in comments) . Onshore/Offshore: Onshore Suspension Date: 11/17/15 Date AOGCC Notified: 12/10/15 Sundry No.: 315-423 Type of Inspection: Initial - Wellbore Diagram Avail.? Yes Well Pressures(psi): Tubing 0 Photos Taken? Yes IA 0 OA N/A Condition of Wellhead: The wellhead looked to be in good clean condition with no signs of leaks or drips,All lines were blinded with gauges installed.There was no SSV or flowline installed.Location was verified with a pad map. Condition of Surrounding Surface The wellhead waas protected the use of a with a wellhouse.Clean snow on the floor of the wellhouse.The cellar had clean snow and Location: gravel.The pad was good clean snow. Follow Up Actions Needed: none Comments: Attachments: Photos(4) REVIEWED BY: Insp.Supry J Pam iz.1Si-413 Comm PLB 12/2015 2015-1213_Suspend_PBU_J-30_bn.xlsx • • Suspended Well Inspection—PBU J-30 PTD 2140750 Photos by AOGCC Inspector B. Noble 12/13/2015 I g WELL: J-30 :, ! P:** ER Prudhoe Bay Unit M OPERATOR BP Exploration (Alaska) Ipc -r API NUMBER 50-029-235157-R9.19, ''; - ' -ATION NE 1/4, Sec. 09,T11N,RV3E"'° t DRILLING PERMIT 214-075 '� 4141't. , 0 , „ * r Zgym# ®$ '1 ‘ . 2015-1213_Suspend_PBU J-30_photos_bn.docx Page 1 of 2 ' 0 ..,. ... 4 czti § .fix' .: 74-"'-'''' .. . . .„,,,..„.„...„. ...... „ . ,.,_ . 1 K',..--4 4/..„..„....,..,, -,,..-dik :;,,..ii,I.,' :-- , ,•,..-.' ' „,,.. ,..,,,,,," . . . .. ., , , .... .. ,,,, . 11 u T ° , wa 4 'ems; 147.'"- Y :4,1'w' ' ton y� i o .. ,...1m .: al AO , 4 w a ? v) N STATE OF ALASKA LASKA OIL AND GAS CONSERVATION COMMI WELL MPLETION OR RECOMPLETION REPAND LOG la. Well Status: Oil LI Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended p • lb.Well Class: 20AAC 25.105 20AAC 25.110 Development p Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ No.of Completions: Zero Service ❑ Stratigraphic Test ❑ 2. Operator Name: 6. Date Comp.,Susp.,or Aband.: 14.Permit to Drill Number/Sundry BP Exploration(Alaska),Inc 11/17/2015 214-075 • 315-423 3. Address: 7. Date Spudded: 15 API Number: P.O.Box 196612 Anchorage,AK 99519-6612 7/11/2014 50-029-23515-00-00 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 7/14/2014 PBU J-30 Surface: 4500'FSL,1246'FEL,Sec.09,T11N,R13E,UM • 9 KB Ref Elevations 17. Field/Pool(s): 85.4 • Top of Productive Interval: N/A GL 38,3 - BF N/A PRUDHOE BAY,PRUDHOE OIL Total Depth: 4466'FSL,1460'FEL,Sec.09,T11N,R13E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: '2608'/2587' , ADL 02.8282-----i-- I ,3 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/TVD): 19. Land Use Permit: 13-e Surface:x- 643106 y- 5970565 Zone - ASP 4 2698'/2676' 85-24 TPI: x- y- Zone - 12. SSSV Depth(MD/TVD): 20 Thickness of Permafrost MD/TVD: Total Depth:x- 642893 y- 5970528• Zone - ASP 4 None 2002'/1990' 5. Directional or Inclination Survey: Yes ❑ (attached) No p 13. Water Deoth.if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) N/A 22. Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary MWD/GR/RES,Cement Evaluation 23. CASING,LINER AND CEMENTING RECORD CASING WT.PER GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZEAMOUNT FT. CEMENTING RECORD PULLED TOP BOTTOM TOP BOTTOM 20" 91.5# H-40 48' 128' 48' 128' 42" 15 yds Type 3 Cement 9-5/8" 40# L-80 47' 2694' 47' 2672' 12-1/4" 2143 sx LiteCrete,237 sx Class'G' VF NIJV 20 2)15 24. Open to production or injection? Yes I=1No p 25. TUBING RECORD GCC If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): None None 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. Was hydraulic fracturing used during completion? Yes ❑ No I1 Per 20 AAC 25.283(i)(2)attach electronic and printed information DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation(Flowing,gas lift,etc.):N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period —4- Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press 24 Hour Rate —+ Form 10-407 Revised 11/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only VI`– 1+gilte , (/( RBDMSBEC 0 1 20156 28., CORE DATA Conventional Core(s) Yes ❑ No El Sidewall Cores Yes 0 No El - If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize ethology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost-Top 38' 38' Well Tested? Yes 0 No Q Permafrost-Base 2040' 2028' If yes,list intervals and formations tested,briefly summarizing test results.Attach Top of Productive Interval separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Formation at total depth: 31. List of Attachments: Correspondence with AOGCC,Well Schematic Diagram $(.4n1,4441 rept-(+) oljr(a'lbdta�duneuev3 Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis,paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Sternicki,Oliver R Email: Oliver.Sternicki@bp.com Printed Name: Joe Lastufk 11 Title: Drilling Technologist Signature: J` Phone: +1 907 564 4091 Date: /15 INSTRUCTIONS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item 1 b.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and TVD for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31.Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 11/2015 Submit ORIGINAL Only TREE_, 4 ,116"DRY HOLE • J —30 N a i WELLHEAD- ACTINITIAL SUSPENDED MKB.B.ELE 85.4' BF.ELEV= KOP= Max Angle= _' :_, ' 478' —i9-5/8"TAM FORT COLLAR Datum MD= Datum TVD= 8800'ti-', ,4. 20"X 30'INSULATED CONDUCTOR, 80' + 215.5#,A-53,D=19.250" r ir 4- X i i x PBTD H 2608' - - ,r�it.+.r .+ 4 v *+.y.. JI +.r.t� .�. .v. 9-5/8"CSG,40#,L-80 BTC,D=8.835" 2694' DATE REV BY COMMENTS DATE REV BY COMWENTS PRUDHOE BAY UNIT 07/24/14 PKR 272 INTIAL(SUSPETDEU) WELL: J-30 07/29/14 PJC DRLG HO CORRECTIONS PERA+IT ND:"1140750 API No: 50-029-23515-00 SEC 9,T11 N,R13E,780'FNL&1246'FWL BP Exploration(Alaska) . North America-ALASKA-BP Page 1 of 26 Operation Summary Report max; Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 7/8/2014 03:00 - 06:00 3.00 RIGD P PRE SECURE WELLAND CONTINUE TO RIG DOWN -PREPARE TO MOVE OFF WELL 06:00 - 12:00 6.00 RIGD P PRE DISCONNECT INTERCONNECT LINES -SKID RIG FLOOR -LAY DOWN DERRICK 12:00 - 17:00 5.00 RIGD P PRE MOVE AND STAGE MUD,UTILITY AND DRILL MODULES ON WEST SIDE OF DS 18 17:00 - 00:00 7.00 MOB P PRE MOVE UTILITY AND DRILL MODULE FROM DS lh ;18 TOWARD J PAD SKID 50(PUMP STATION 1)AT 24:00 -PICK DUMMY WELLHOUSE AND SPOT ON J-30. 7/9/2014 00:00 - 06:30 6.50 MOB P %, PRE MOVE UTILITY AND DRILL MODULE FROM DS 18 TO J PAD -AT PRICE PAD AT 04:30 06:30 - 08:30 2.00 MOB P l4 PRE SPOT DRILL MOD OVER WELL HOUSE -MOBILIZE CREW TO DS 18 TO BEGIN MOVING MUD MOD 08:30 - 09:00 0.50 MOB P PRE ADJUST DUMMY WELL HOUSE AND SHIM DRILL MOD -DROP SUPPORT COLUMN ON DRILL MOD 09:00 - 10:00 1.00 MOB P PRE SPOT UTILITY MOD NEXT TO DRILL MOD BEGIN MOVING MUD MODULE FROM DS 18 TOWARD J PAD PROVIDED AOGCC 24 HOUR NOTIFICATION FOR DIVERTER TEST. 10:00 - 10:30 0.50 MOB P PRE PULL CURTAINS AND PUT IN FLOOR SECTIONS AT INTERCONNECTS BETWEEN DRILL AND UTILITY MOD -CONTINUE MOVING MUD MOD 10:30 - 15:00 4.50 MOB P PRE CONNECT ELECTRICAL INTERCONNECT BETWEEN DRILL AND UTILITY MODS -WORK ON RIGGING UP DIVERTER LINE -CONTINUE MOVING MUD MOD 13:00 HRS-PRE-SPUD MEETING WITH ANCHORAGE AND SLOPE PERSONNEL. 15:00 - 19:00 4.00 MOB P PRE RAISE DERRICK -MAX WEIGHT OBSERVED=520K -SECURE RIG FLOOR -SLIDE HAUNCH INTO POSITION -SKID RIG FLOOR -BRIDLE DOWN 19:00 - 20:30 1.50 MOB P PRE SPOT MUD MODULE ON J PAD AND SECURE DOORS 20:30 - 00:00 3.50 MOB P PRE RIG UP -SPOT CUTTINGS TANK -SET WALKWAYS -RIG UP RIG FLOOR -HOOK UP MUD LINES -PREP PIPE SHED -MAKE UP STAND TO TEST IDL Printed 5/31/2016 2:14:19PM *All depths reported in Drillers Depths* • • North America-ALASKA-BP Page 2 of 26 Operation Summary Report Common Well Name:J-30 I AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30©85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 7/10/2014 00:00 - 02:00 2.00 MOB P PRE CONTINUE TO RIG UP -RIG UP HIGH PRESSURE LINES TO RIG FLOOR. -CONTINUE TO MAKE UP CONNECTIONS IN INTERCONNECTS. -STRAP AND TALLY DRILL PIPE IN SHED. -CHECK GAS ALARMS THROUGHOUT RIG. STAGE HIGH PRESSURE RISER SECTIONS BEHIND RIG. ***ACCEPT RIG AT 00:00 *** 02:00 - 06:30 4.50 MOB P PRE CONTINUE TO RIG UP AND TAKE ON FLUIDS TO PITS. -INSTALL VALVES ON CONDUCTOR. -CONTINUE TO STRAP AND TALLY DRILL PIPE. -CONTINUE TO TORQUE UP BOLTS ON DIVERTER LINE. -TAKE ON 8.6 PPG MAXDRIL-N IN PITS. -CHANGE OUT SAVER SUB. -CALIBRATE TOTCO SENSORS AND SCREENS 06:30 - 11:00 4.50 MOB P PRE CONTINUE TO RIG UP I5ICK UP AND SET 21-1/4"ANNULAR ON HIGH PRESSURE RISER;TORQUE BOLTS -REASSEMBLE 5"ELEVATORS -TAKE ON 8.6 PPG MAXDRIL-N IN PITS AND MIX -BRING BAKER MWD TOOLS INTO PIPE SHED -TROUBLESHOOT IDL 11:00 - 12:00 1.00 MOB P PRE CONTINUE TO RIG UP -RIG UP TURN BUCKLES ON ANNULAR -INSTALL KOOMEY HOSES ON ANNULAR -PLACE FLOORING IN WELL HOUSE -MOBILIZE LOW PRESSURE RISER TO THE RIG FLOOR -TAKE ON 8.6 PPG MAXDRIL-N IN PITS AND MIX 12:00 - 16:00 4.00 MOB P PRE CONTINUE TO RIG UP -INSTALL RISER AND AIR BOOTS AND TURN BUCKLES -HOOK UP DRAIN LINES AND HOLE FILL LINES -INSTALLANNULAR CONTROL LINES -PIN IDL OUT OF THE WAY -TAKE ON 8.6 PPG MAXDRIL-N IN PITS AND MIX 16:00 - 20:00 4.00 DRILL P SURF MOBILIZE BHA TOOLS TO PIPE SHED -MAKE UP STANDS AND RACK BACK IN DERRICK -LOAD PIPE SHED WITH 4"HWDP -MAKE UP STANDS 4"HWDP AND RACK BACK -DRAW DOWN TEST ON ANNULAR CONDUCT DIVERTER/KNIFE VALVE TEST -KNIFE VALVE OPEN IN 26 SECONDS -ANNULAR CLOSED IN 30 SECONDS -TEST WITNESS WAIVED BYAOGCC REP JOHN CRISP Printed 5/31/2016 2:14:19PM *AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 3 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30©85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:00 - 22:30 2.50 DRILL P SURF RIG UP WIRELINE AND GYRO -MOBILIZE TOOLS TO THE RIG FLOOR -MOBILIZE BHA TO THE RIG FLOOR 22:30 - 23:00 0.50 DRILL P SURF CALIBRATE BLOCK HEIGHT 23:00 - 00:00 1.00 DRILL P SURF PICK UP 12-1/4"BHA COMPONENTS 7/11/2014 00:00 - 01:30 1.50 RIGU P PRE PICK UP 12-1/4"SURFACE HOLE BHA PER BAKER DD 01:30 - 02:00 0.50 RIGU P PIE‘ RIG EVACUATION DRILL AND AAR 02:00 - 06:00 4.00 DRILL P SURF SPUD WELL AT 02:00 AND DRILLAHEAD IN 12-1/4"SURFACE HOLE TO 328' -RACK STAND BACK AND PICK UP DRILL COLLARS -TAG UP AT 3RD NON MAG COLLAR -LAY DOWN COLLAR AND PICK UP STAND OF HWDP CLEAN OUT FILL AND RACK BACK STAND OF HWDP -PICK UP NON MAG COLLAR AND RIH ORIENT UBHO SUB MAKE UP HWDP AND COLLARS DRILL AHEAD IN 12-1/4"SURFACE HOLE TO 328' 420 GPM,560 PSI ON,500 PSI OFF -60 RPM,1K TQ ON,1K TQ OFF -PU 51K,SO 51K,ROT 51K -WOB 1-6K -GYRO-90' -CIRCULATE ON BOTTOM FOR 3-4 MINUTES PRIOR TO CONNECTIONS 06:00 - 06:30 0.50 DRILL I P SURF ATTEMPT TO GYRO AT 328' -UNABLE TO GET PASSED 180'WITH GYRO- TWO ATTEMPTS -ROTATE STRING 1/2 TURN COUNTERCLOCKWISE AND SUCCESSFULLY MARRIED UP UBHO SUB WITH GYRO 06:30 - 08:30 2.00 DRILL N DPRB 328.00 SURF MAKE CONNECTION AND ATTEMPT TO PICK UP WITH 20K OVERPULL -SET DOWN 20KAND ATTEMPT TO PUMP AT DRILLING RATE WITH NO SUCCESS;RACK BACK STAND -ATTEMPT TO ROTATE TRAPPED TORQUE IN STRING AT LIMIT OF 10K. -INCREASE TORQUE LIMIT TO ATTEMPT TO ROTATE STRING UP TO 16K -ATTEMPT TO WORK STRING -LOST CIRCULATION=75% -RELEASE TORQUE FROM STRING,WORK PIPE FREE -SLOWLY WORK STRING UP AT 45K ROT,30 RPM,TQ 11K -CIRCULATE CUTTINGS OUT. -LARGE INCREASE IN CUTTINGS OBSERVED AT SHAKERS AS WELL AS WATER CUT MUD RETURNS 08:30 - 09:00 0.50 DRILL N DPRB 328.00 SURF PUMP OUT OF THE HOLE WITH LAST STAND OF HWDP -30 RPM,51K ROT AT 1-4K TO -60 SPM,180 PSI Printed 5/31/2016 2:14:19PM `AII depths reported in Drillers Depths" North America-ALASKA-BP Page 4 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Firs Task Code NPT NPT Depth j Phase Description of Operations (hr) (usft) 09:00 - 10:00 1.00 DRILL N DPRB 328.00 SURF CIRCULATE AND RECIPROCATE PIPE -60 SPM,180 PSI -DISCUSS PLAN FORWARD WITH TOWN 10:00 - 10:30 0.50 DRILL N DPRB 328.00 SURF CONTINUE TO WORK PIPE AND DISCUSS PLAN FORWARD WITH TOWN -RACK BACK LAST STAND OF HWDP -MAKE UP 5'4"DRILL PIPE TO XO ON TOP OF COLLARS -PULL UP INTO CONDUCTOR 10:30 - 12:00 1.50 DRILL N DPRB 328.00 SURF MONITOR FLOW FROM WELL INTO PITS -WELL FLOWING AT 37 BBLS/HOUR -START TO WEIGHT UP MUD SYSTEM TO 9.1 PPG 12:00 - 13:30 1.50 DRILL N DPRB 328.00x' SURF MONITOR FLAW FROM WELL INTO PITS -WELL FLOWING AT 37 BPH AT 12:00/ DECREASED TO 23.5 B,PH AT 13:30 -WEtGHT UP MUD SYSTEM TO 9.1 PPG 13:30 - 14:30 1.00 DRILL N. DPRB 328.00 SURF DISPLACE CONDUCTOR TO 9.1 PPG AND MONITOR WELL 14:30 - 18:00 3.50 DRILL N DPRB 328.00 SURF WEIGHT UP MUD TO 9.3 PPG -FLOW BACK 12 BPH AT 15:30 k FLOW BACKAT 9 BPH AT 16:30 18:00 - 19:00 1.00 DRILL N DPRB 328.00 SURF DISPLACE CONDUCTOR TO 9.3 PPG AND WASH DOWN TO 140' -OBSERVE DECREASE IN VISCOSITY IN MUD; PULL UP TO 127' -FLOW BACK STOPPED AT 19:00 HRS 19:00 - 21:00 2.00 DRILL N DPRB 328.00 SURF CONDITION MUD AND BRING MUD UP TO 300 VISCOSITY -MUD COMING BACK AT 8.8 PPG. -CIRCULATED 2 SURFACE TO SURFACE VOLUMES. -MUD WEIGHT BACK STILL 8.8 PPG -MONITOR WELL -WELL FLOWING AT 2 BPH. -CIRCULATED SURFACE TO SURFACE WITH 9.3 PPG MUD. -MUD WEIGHT OUT=9.3 PPG. -MONITOR WELL-STATIC. 21:00 - 00:00 3.00 DRILL N DPRB 328.00 SURF WASH TO 329'AT 230 PSI 7/12/2014 00:00 - 00:30 0.50 DRILL N DPRB 328.00 SURF WASH BACK TO BOTTOM. -300 GPM,20 RPM. AUGER IN PITS SHUT DOWN AND BOUND UP WITH GRAVEL. SHUT DOWN PUMPS AND PREPARED TO PULL BACK TO SHOE. GRAVEL CONTINUED TO LOAD UP AND PACK OFF SHAKERS. 00:30 - 01:00 0.50 DRILL N SFAL 328.00 SURF PULL UP INTO THE CONDUCTOR WITH BHA. -PU 48K;SO 48K. Printed 5/31/2016 2:14:19PM "All depths reported in Drillers Depths* • • North America-ALASKA-BP Page 5 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:00 - 03:00 2.00 DRILL N SFAL 328.00 SURF CLEAN UP SHAKER ROOM. -RIG UP 4"HOSE FROM SUPER SUCKER TO SHAKER DECK. -CLEAN OUT GRAVEL FROM AUGER. -CLEAN OUT SHAKERS AND AROUND POSSUM BELLY. -MR ON INCIDENT AND PJSM ON PLAN FORWARD. TRACTION REPORT FORTHCOMING. -NOTIFIED NS SUPERINTENDENT. 03:00 - 04:00 1.00 DRILL N SFAL 328.00 SURF WASH BACK TO BOTTOM. -100 GPM'AND NO ROTATION. -30'OF FILIL ON BOTTOM. 04:00 - 09:00 5.00 DRILL P SURF DRILL 12.25"SURFACE HOLE FROM 360'MD TO 603'MD -400 GPM, 550 PSI ON,620 PSI OFF -60 RPM,1K TORQUE ON,1K TORQUE OFF -PU 56K,SO 56K,ROT 56K -WOB 1-3K -GYRO EVERY-90 FT -ACTUAL ROTATE TIME=4.8 HRS MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT -WORK FULL STAND 2 TIMES AT 603',RACK ONE BACK AND GYRO AT 513' 09:00 - 09:30 0.50 DRILL P SURF POOH ON ELEVATORS FROM 513'TO 497' -PU 59K,SO 59K AT 513' -ENCOUNTERED TIGHT HOLE AT 500'WITH 20K OVERPULL -MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT 09:30 - 10:00 0.50 DRILL P SURF PUMP OUT OF THE HOLE TO 452' -400 GPM,550 PSI -40 RPM,1K TQ,ROT 56K -OBSERVED FLOW AT BELL NIPPLE WASH BACK DOWN TO 603' -400 GPM,550 PSI -40 RPM,1K TQ,ROT 56K -MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT 10:00 - 10:30 0.50 DRILL P SURF WORK PIPE ON 30'STROKES -300 GPM,335 PSI -15 RPM,1K TQ,ROT 56K -WEIGHT UP MUD TO 9.6 PPG 10:30 - 11:30 1.00 DRILL P SURF PUMP 200 BBLS OF 9.6 PPG MUD AND WORK STAND IN 30',60'AND 90'INCREMENTS -400 GPM,550 PSI -15 RPM,ROT 60K -9.5 PPG HEAVY OBSERVED IN PITS -FLOW CHECK WELL;SLIGHT FLOW OBSERVED 4.5-5 BPH. NO GAS OBSERVED 11:30 - 14:00 2.50 DRILL P SURF PUMP OUT OF THE HOLE FROM 603' -300 GPM,335 PSI -PU 54K 14:00 - 15:00 1.00 DRILL P SURF MONITOR WELL FOR 15 MINUTES;STATIC -MAKE UP 12-1/4"BHA TO 187' -INSPECT BIT;GOOD TO RERUN 15:00 - 15:30 0.50 DRILL P SURF SERVICE RIG FLOOR EQUIPMENT 15:30 - 16:30 1.00 DRILL P SURF CONTINUE TO MAKE UP 12-1/4"DRILLING BHA TO 540' -PU 54K,SO 54K AT 540' Printed 5/31/2016 2:14:19PM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 6 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:30 - 17:30 1.00 DRILL P SURF WASH DOWN TO 603' -525 GPM,1100 PSI -PULL UP ONE STAND AND BREAK OFF DOUBLE TO GYRO 17:30 - 00:00 6.50 DRILL P SURF DRILL 12.25"SURFACE HOLE FROM 603'MD TO 980'MD(975'TVD) -525 GPM, 1320 PSI ON,1250 PSI OFF -45 RPM,2K TORQUE ON,1K TORQUE OFF -PU 70K,SO 70K,ROT 68K -WOB 8K 1-GYRO EVERY-94 FT -ACTUAL ROTATE TIME=.9 HRS 1-ACTUAL SLIDE TIME=2.3 HRS -JAR HOURS=8 HRS -MUD WEIGHT:9.6 PPG IN,9.6 PPG OUT 7/13/2014 00:00 - 06:00 6.00 DRILL P SURF DRILL 12.25"SURFACE HOLE FROM 980'MD TO 1311'MD -520 GPM, 1460 PSI ON,1380 PSI OFF -45 RPM,2K TORQUE ON,1K TORQUE OFF PU 74K,SO 70K,ROT 72K WOB 15K -GYRO EVERY-90 FT -BACKREAM 10 FT PRIOR TO CONNECTIONS MUD WEIGHT:9.7 PPG IN,9.7 PPG OUT 06:00 - 12:00 6.(0 DRILL P SURF' DRILL 12.25"SURFACE HOLE FROM 1311'MD TO 1705'MD(1697'TVD) -550 GPM, 1680 PSI ON,1530 PSI OFF -45 RPM,2K TORQUE ON,1K TORQUE OFF -PU 83K,SO 74K,ROT 72K -WOB 13K -ECD:ACTUAL=10.27 PPG SURVEY EVERY-90 FT -ACTUAL ROTATE TIME=1.3 HRS -ACTUAL SLIDE TIME=5.3 HRS -JAR HRS=14.3 -BACKREAM 15 FT PRIOR TO CONNECTIONS -MUD WEIGHT:9.7 PPG IN,9.7 PPG OUT -DIFFICULTY BUILDING ANGLE DURING SLIDES,INTERMITTENT HARD SPOTS ENCOUNTERED FROM 1414'ON. 12:00 - 16:00 4.00 DRILL P SURF DRILL 12.25"SURFACE HOLE FROM 1705'MD TO 2038'MD -550 GPM, 1860 PSI ON,1690 PSI OFF -60 RPM,3K TORQUE ON,2K TORQUE OFF -PU 89K,SO 79K,ROT 82K -WOB 18K -MUD WEIGHT:9.6 PPG IN,9.6 PPG OUT 16:00 - 17:00 1.00 DRILL P' SURF CIRCULATE BOTTOMS UP -425 GPM,1100 PSI -70 RPM,1K TQ -PULL 1 STAND WHILE CIRCULATING BOTTOMS UP 17:00 - 20:00 3.00 DRILL P SURF PUMP OUT OF THE HOLE FROM 2026'TO 350' -MONITOR WELL FOR 10 MINUTES PRIOR TO POOH;STATIC -MUD WEIGHT:9.6 PPG IN,9.6 PPG OUT -400 GPM,1000 PSI -50K OVERPULL OBSERVED AT 1020', ROTATE AT 45 RPM AND WIPE AREA. Printed 5/31/2016 2.14:19PM *AII depths reported in Drillers Depths* North America-ALASKA-BP • Page 7 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:00 - 20:30 0.50 DRILL P SURF SERVICE TOP DRIVE -GREASE WASHPIPE. -RE-CALIBRATE ST-80. 20:30 - 22:00 1.50 DRILL P SURF RUN IN THE HOLE ON ELEVATORS WITH 12.25"DRILLING BHA FROM 350'TO 2026' -MUD WEIGHT:9.6 PPG IN,9.6 PPG OUT 22:00 - 00:00 2.00 DRILL P SURF DRILL 12.25"SURFACE HOLE FROM 2026'MD -TO2180'MD ( --550 GPM, 1950 PSI ON,1875 PSI OFF `_e0 RPM,3K TORQUE ON,2K TORQUE OFF -PU 90K,SO 80K,ROT 82K -WOB 8-18K SURVEY EVERY-90 FT -ACTUAL ROTATE TIME=2.5 HRS -ACTUAL SLIDE TIME=5 HRS -JAR HRS=18.9 -BACKREAM 15 FT PRIOR TO CONNECTIONS -MUD WEIGHT 9.6 PPG IN,9.6 PPG OUT 7/14/2014 00:00 - 02:00 2.00 DRILL P SURF DRILL 12.25"SURFACE HOLE FROM 2180'MD TO 2350'MD -550 GPM, 1920 PSI ON,1790 PSI OFF I ,- .-60 RPM,3K TORQUE ON,2K TORQUE OFF -PU 96K,SO 81K,ROT 86K -WOB14K -SURVEY EVERY-90 FT -WIPE 15 FT PRIOR TO CONNECTIONS -MUD WEIGHT:9.7 PPG IN,9,7 PPG OUT -INTERMITTENT HARD SPOTS. 02:00 - 02:30 0.50 DRILL P SURF SERVICE RIG -RACK BACK ONE STAND AND WORK ONE FULL STAND. -100 GPM;600 PSI. -CHANGE OUT SWABS IN MUD PUMP#1. 02:30 - 07:00 4.50 DRILL P SURF DRILL 12.25"SURFACE HOLE FROM 2350'MD TO 2698'MD(2676'TVD) -550 GPM, 2100 PSI ON,1900 PSI OFF -70 RPM,4K TORQUE ON,3K TORQUE OFF -PU 102K,SO 82K,ROT 87K -WOB 18K -SURVEY EVERY-90 FT -ACTUAL ROTATE TIME=2.9 HRS -ACTUAL SLIDE TIME=1.4 HRS -JAR HRS=23.2 -WIPE 15 FT PRIOR TO CONNECTIONS -MUD WEIGHT:9.7 PPG IN,9.7 PPG OUT 07:00 - 09:00 2.00 DRILL P SURF CIRCULATE HOLE CLEAN -650 GPM,2550 PSI -70 RPM,2-3K TQ -RECIPROCATE PIPE -PUMP WALNUT SHELL SWEEP 09:00 - 10:00 1.00 DRILL P SURF PUMP OUT OF THE HOLE FROM 2698'TO 1973' -MONITOR WELL FOR 10 MINUTES PRIOR TO PULLING OUT;STATIC -MUD WEIGHT:9.6 PPG IN,9.6 PPG OUT -PU 92K,SO 82K AT 1973' Printed 5/31/2016 2.14.19PM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 8 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 11:30 1.50 DRILL P SURF RIH ON ELEVATORS FROM 1973'TO 2698' -MONITOR WELL FOR 10 MINUTES PRIOR TO RIH;STATIC -TIGHT SPOT ENCOUNTERED AT 2250',SET ,DOWN 15K. OVER PULL 20K UP ATTEMPT TO PUMP AND MOTOR STALLED.WORKED PIPE 3'WHILE BRINGING UP PUMPS AND ROTARY. BROKE FREE AND PULLED ABOVE AND ROTATED THROUGH. PULLED BACK THROUGH WITHOUT ROTARY WITH PUMPS ON. NO OVER PULL OBSERVED,RAN THROUGH WITHOUT PUMPS ON AND NO SLACK OFFkk OBSERVED. 11:30 - 12:30 1.00 DRILL P SURF CIRCULATE PRIOR?TO POOH -650 GPM,2550 PSI i "t; -50 RPM,2K TQ -RECIPROCATE PIPE 12:30 - 16:00 3.50 DRILL P SURF PUMP OUT OF THE HOLE FROM 2698'TO 650' -MONITOR WELL FOR 10 MINUTES PRIOR TO PULLING OUT;STATIC -300 GPM,800 PSI AT 2698' - 1-2250'ENCOUNTERED 15K OVER PULL, WIPED ONCE AND WENT BACK THROUGH 'WITH NO OVER PULL -. -MUD WEIGHT:9.6 PPG IN,9.6 PPG OUT rt.. -50'/MINUTE PULLING SPEED 16:00 - 19:303.50 t DRILL P SURF PUMP OUT OF THE HOLE FROM 650'TO SURFACE -MONITOR WELL FOR 10 MINUTES PRIOR TO PULLING OUT;STATIC -300 GPM,350 PSI AT 650' -MUD WEIGHT:9.6 PPG IN,9.6 PPG OUT -LAY DOWN BHA TO PIPE SHED 19:30 - 20:00 0.50 DRILL P SURF CLEAN AND CLEAR RIG FLOOR 20:00 - 21:30 1.50 CASING P SURF RIG UP TO RUN 9-5/8"CASING -CHANGE OUT TOP DRIVE BAILS TO LONG BAILS -RIG UP VOLANT TOOL -RIG UP DOYON CASING -MAKE UP SAFETY VALVE -INSTALL BAIL EXTENSIONS -INSTALL 9-5/8"SIDE DOOR ELEVATORS -INSTALL PS 21'S AND CHANGE OUT INSERTS 21:30 - 00:00 2.50 CASING P SURF RUN 9-5/8",40#,L-80,BTC CASING TO 120' -CHECK FLOATS -BAKER LOCK SHOE TRACK -USE BEST 0 LIFE 200 NM PIPE DOPE -TORQUE CONNECTIONS TO 8500 FT-LBS -RUN 1 FLOATING CENTRALIZER ON JOINTS 3-25 -BREAK CIRCULATION EVERY 420'AT 5 BPM -FILL CASING EVERY JOINT -MUD WEIGHT:9.6 PPG IN,9.6 PPG OUT Printed 5/31/2016 2 14 19PM "All depths reported in Drillers Depths` • North America-ALASKA-BP • Page 9 of 26 Operation Summary Report Common Well Name.J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2.00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 7/15/2014 00:00 - 09:30 9.50 CASING P SURF RUN 9-5/8",40#,L-80,BTC CASING FROM 120' TO 2693' -USE BEST 0 LIFE 200 NM PIPE DOPE -TORQUE CONNECTIONS TO 8500 FT-LBS -RUN 1 FLOATING CENTRALIZER ON JOINTS 3-25 -BREAK CIRCULATION EVERY 400'AT 3 BPM FOR 5 MINUTES -FILL CASING EVERY JOINT l -MUD WEIGHT:9.6 PPG IN,9.6 PPG OUT -FINAL PU 125K,SO 98K -ENCOUNTERED AND WORKED THROUGH TIGHT SPOTS AT:485',950',1115' -RUN IN AND MAKE UP HANGER AND LANDING JOIN'T. MAKE UP PUP TO TOP OF LANDING JOINT. 09:30 - 11:00 1.50 CEMT P SURF STAGE UP TO CEMENTING RATE IN 1 BPM INCREMENTS TO FINAL CIRCULATING RATE , OF 6 BPM -3 BPM,258 PSI -4 BPM,265 PSI -5 BPM,270 PSI -6 BPM,280 PSI -CONDITION MUD TO 9.7 PPG,20 PV,16 YP INITIAL PRESSURE AT CEMENTING RATE: 11 i 280 PSI -FINAL PRESSURE AT CEMENTING RATE AFTER HOLE CONDITIONED:230 PSI -CIRCULATE TOTAL OF 4.5 TIMES BOTTOMS-UP -RECIPROCATED PIPE WITH 10 FT OF STROKE. -CONDUCT PJSM ON CEMENT JOB TEST LINES OFFLINE Printed 5/31/2016 2:14:19PM `AII depths reported in Drillers Depths` •North America-ALASKA-BP Page 10 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 16:00 5.00 CEMT P SURF RIG UP AND CEMENT 9.625",40#/FT SURFACE CASING AS FOLLOWS. -FILL LINES WITH WATER AND PRESSURE TEST LINES -250/4500 FOR 5 MIN EACH. -MAKE UP CEMENT LINE TO CEMENT SWIVEL. PUMP 100 BBLS OF 10 PPG MUD PUSH AT 5 BBLS/MINUTE -338 PSI INITIAL,250 PSI FINAL. -BACK OUT VOLANT TOOL,DROP BOTTOM PLUG AND MAKE UP VOLANT TOOL. -PUMP 729 BBLS OF 11 PPG LITECRETE LEAD CEMENT @ 5 BPM -EXCESS OF 500%THROUGH • PERMAFROST.(YIELD 1.91 CU.FT/SK)-2143 SK. -333 PSI INITIAL,530 PSI FINAL ( -MAX PRESSURE 586 PSI WITH 645 ` BBLS AWAY. -LANDED BOTTOM PLUG WITH 204 BBLS AWAY. INTERFACE WITH MUDPUSH NOTED IN .RETURNS WITH 385 BBLS AWAY. I w -STOPPED RECIPROCATING WITH 450 • BBLS AWAY. -PU INCREASED 68K OVER LANDED WT. -WORKED BACK TO BOTTOM AND PUT IT ON THE LANDING RING -INDICATIONS OF CEMENT IN RETURNS WITH 585 BBLS AWAY. -SHUT DOWN WITH 729 BBLS OF LEAD PUMPED AND BATCH UP TAIL. -AIR COMPRESSOR ON CEMENT TRUCK FAILED. -30 MIN TO FIX COMPRESSOR AND BATCH UP TAIL. -PUMP 49 BBLS OF 15.8 PPG CLASS G TAIL@ 3.5 BPM -EXCESS VOLUME 40%(YIELD 1.16 CU.FT/SK)-237 SX -376 PSI INITIAL,565 PSI FINAL. -BACK OUT VOLANT TOOL,DROP TOP PLUG AND MAKE UP VOLANT TOOL. -SLB KICK OUT TOP PLUG WITH 10 BBLS OF FRESH WATER. -PERFORM DISPLACEMENT WITH RIG PUMPS AND 9.6 PPG MUD -PUMP 100 BBLS AT 10 BPM;480 PSI ICP, 750 PSI FCP. -PUMP 80 BBLS AT 7 BPM;510 PSI ICP,875 PSI FCP. -PUMP 18 BBLS AT 2 BPM;615 PSI ICP,950 PSI FCP. -BUMP PLUG WITH 1994 STROKES(184.4 BBLS)AT 950 PSI. -INCREASE PRESSURE TO 1450 PSI AND HOLD FOR 5 MIN. -CHECK FLOATS--GOOD. -CEMENT IN PLACE(CIP)@ 15:20 7/15/2014. -TOTAL DISPLACEMENT VOLUME 184.4 BBLS Printed 5/31/2016 2:14:19PM `AII depths reported in Drillers Depths* • North America-ALASKA-BP Page 11 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:OOAM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) -MEASURED BY STROKES @ 96%PUMP EFFICIENCY -NO PIPE RECIPROCATION DURING DISPLACEMENT -378 BBLS CEMENT RETURNED TO SURFACE -TOTAL CEMENT LOSSES DURING JOB=4 BELS 16:00 - 16:30 0.50 CEMT P SURF UNSCREW FROM FLUTED HANGER -BREAK OUT PUP JOINT -REMOVE VOLANT TOOL -LAY DOWN LANDING JOINT 16:30 - 18:30 2.00 CEMT P SURF RIG DOWN CEMENT/CASING TOOLS -REMOVE BALES EXTENSIONS AND ELEVATORS -CHANGE OUT BALES -LAY DOWN VOLANT TOOL -PULL PS 21'S -LAY DOWN CASING TOOLS -BREAK DOWN SAFETY VALVE -CLEAN OUT FLOW BOX AND RIG FLOOR 18:30 - 22:00 3.50 WHSUR P SURF UNSUCCESSFULLY ATTEMPT TO NIPPLE DOWN ANNULAR AND RISERS -DRAIN RISERS -CLEAN OUT CELLAR BOX -PULL BELL NIPPLE. -PREP TO DISMANTLE DIVERTER WHEN RISER AND ANNULAR FILLED UP WITH FLUID FROM WELL -REINSTALL BELL NIPPLE AND AIR UP BOOTS TO MONITOR WELL WITH FLOWPATH TO PITS 22:00 - 23:00 1.00 CEMT N CEMT SURF RUN IN HOLE WITH STAND OF 4"DRILLPIPE _ AND STACK WASHER TOOL TO 100'MD. DISPLACE RISERS ABOVE WELLHEAD TO 9.9 PPG,360 SEC/QT FUNNEL VIS SPUD MUD. JET WASH STACK AND FLUSH TOP OF HANGER. -MONITOR WELL AFTER DISPLACEMENT (WELL CHANNELING FLUID AT 2.7 BPH TO 3.5 BPH TO SURFACE) -COLLECT SAMPLES EVERY HOUR AND RECORD FLOWRATE VARIATIONS EVERY 1/2 HOUR. -OBSERVE 8.7 PPG,1000 MG/L CHLORIDE FLUID(-WATER) -DISCUSS PLAN FORWARD WITH TOWN ENGINEER,NORTH SLOPE SUPERINTENDENT AND WELLS TEAM LEAD 23:00 - 00:00 1.00 CEMT N CEMT SURF MONITOR FLOW FROM WELLAND CONTINUE TO DISCUSS OPTIONS FOR PLAN FORWARD WITH TOWN ENGINEER,NORTH SLOPE SUPERINTENDENT AND WELL TEAM LEAD. -FLOWRATE FROM WELLAVERAGING 2.7-3.5 BPH -COLLECT SAMPLES EVERY HOUR FOR ANALYSIS. -OBSERVE 8.7 PPG,1000 MG/L CHLORIDE FLUID(-WATER) SIMOPS: -BUILD STANDS OF 4"DP OFFLINE Printed 5/31/2016 2:14:19PM *AII depths reported in Drillers Depths* 4110 • North America-ALASKA-BP Page 12 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 7/16/2014 00:00 - 02:00 2.00 CEMT N CEMT SURF MONITOR THE WELLAND CONTINUE TO DISCUSS OPTIONS FOR PLAN FORWARD WITH TOWN ENGINEER,NORTH SLOPE SUPERINTENDENT AND WELL TEAM LEAD. -FLOW ESTIMATED AT 2.5 TO 3.5 BPH. COLLECT SAMPLES EVERY HOUR FOR ANALYSIS. FLUID APPEARS TO BE 8.7 PPG W/ CHLORIDES OF 1000 MG/L -MAKE UP MULE SHOE AND RUN IN THE HOLE ON 2 STANDS OF 4"DRILL PIPE to-200' MD. !-MAKE UP FOSVAND HEAD PIN,WITH 30 PSI PRESSURE GAUGE. DISCONNECT HYDRAULIC CONTROL LINES TO KNIFE VALVE SHUT IN ANNULAR PREVENTER AT 02:00 TO BEGIN MONITORING WELL FOR PRESSURE BUILDUP. SIMOPS: BUILD STANDS OF 4"DRILL PIPE OFFLINE. 02:00 - 14:30 12.50 CEMT N CEMT SURF WITH WELL SHUT-IN ON ANNULAR PREVENTER,MONITOR PRESSURE ON WELL. -NO INDICATIONS OF KNIFE VALVE LEAKING. -NO INDICATIONS OF BROACHING AROUND NEARBY WELL HOUSES(DHD ONSITE TO ASSIST WITH MONITORING) -PRESSURE AT 06:00=1 PSI,07:30=3 PSI, 09:00=4 PSI,9:30-14:30=4.5 PSI STABILIZED) SIMOPS: -BUILD STANDS OF 4"DRILL PIPE OFFLINE. -LOAD OUT SURFACE DIRECTIONAL TOOLS AND LOAD TOOLS FOR INTERMEDIATE HOLE SECTION -WORK ON PLAN FORWARD WITH ANCHORAGE TEAM. BEGIN BUILDING ASSEMBLIES FOR CEMENT TOP JOB. -GATHER AND ACCOUNT FOR TOOLS NEEDED FOR TOP JOB -WORK ON IDL -CLEAN PITS 14:30 - 17:00 2.50 CEMT N CEMT SURF OPEN UP PLUG VALVE ON TOP OF DRILL PIPE TO CHECK FOR PRESSURE AND MONITOR FLOW,NO FLOW UP THROUGH DRILL PIPE. -OPEN ANNULAR PREVENTER AND WELL RESUMED FLOWING. -FLOW RATE OF 4.3 BPH FROM 14:30-15:30. -FLOW RATE OF 3.1 BPH FROM 16:00-17:00. SIMOPS: -RIG UP CROSSOVERS TO 4"VALVES ON CONDUCTOR FOR INJECTIVITY TEST. Printed 5/31/2016 2:14:19PM *All depths reported in Drillers Depths* North America-ALASKA-BP Page 13 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:OOAM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:00 - 20:00 3.00 CEMT N CEMT SURF CONTINUE TO MONITOR WELLAND FLOW RATES. -FLOW RATE OF 2.5 BPH FROM 17:00-18:00. -FLOW RATE OF 2.5 BPH FROM 18:00-19:00. -FLOW RATE OF 2.0 BPH FROM 19:00-19:30. SIMOPS: RIG UP TO PERFORM INJECTIVITY TEST. RUN IN THE HOLE WITH 4 STANDS OF PIPE WITH MULE SHOE -RIG UP FOSV,PUMP IN SUB,TEE AND PLUG VALVES ON TOP -MIX 9.8 PPG BRINE IN PILL PIT -RIG UP LINES TO FILL TEST PUMP TANK WITH BRINE -RIG UP TEST CHART IN WELL HOUSE 20:00 - 22:00 2.00 CEMT N CEMT SURF PERFORM INJECTIVITY TEST ON 20" CONDUCTOR X 9.625"SURFACE CASING ANNULUS. -RIG UP SECONDARY KILL LINE FROM CHARGE PUMPS TO 4"VALVE ON CONDUCTOR CLOSE ANNULAR PREVENTER INJECT 1.3 BBLS AT 50 PSI OVER 13 MIN-- (0.1 BPM). -BUBBLING OBSERVED IN J-25 WELL CELLAR -BLEED OFF PRESSURE 22:00 - 00:00 2.00 CEMT ' N CEMT SURF MONITOR WELLAND ESTABLISH FLOW RATES. -OPEN ANNULAR PREVENTER AND TAKE RETURNS TO TRIP TANK. -FLOW RATE OF 2.0 BPH FROM 22:30-23:30. -FLOW RATE OF 1.5 BPH FROM 23:30-23:59. SIMOPS: -BUILD STANDS OF 4"DRILL PIPE OFFLINE. -HOUSEKEEPING THROUGHOUT THE RIG. 7/17/2014 00:00 - 09:00 9.00 CEMT N CEMT SURF CONTINUE TO MONITOR WELLAND ESTABLISH FLOW RATES. -OPEN ANNULAR PREVENTER AND TAKE RETURNS TO TRIP TANK. -2.1 BPH FROM 00:01-01:00. -2.2 BPH FROM 01:00-02:00. -1.75 BPH FROM 02:00-03:00. -1.55 BPH FROM 03:00-04:00. -1.5 BPH FROM 04:00-05:00. -1.3 BPH FROM 05:00-06:00. -1.5 BPH FROM 06:00-07:00. -1.2 BPH FROM 07:00-08:00. -1.5 BPH FROM 08:00-09:00. SIMOPS: -BUILD STANDS OF 4"DRILL PIPE OFFLINE. -HOUSEKEEPING THROUGHOUT THE RIG. -CLEAN PITS. Printed 5/31/2016 2:14:19PM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 14 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI Active datum:J-30©85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 18:00 9.00 CEMT N CEMT SURF RIG UP TO MONITOR WELLAND ESTABLISH FLOW RATES AT GROUND LEVEL. 23 PSI HYDROSTATIC DIFFERENCE BETWEEN FLOW LINE AND 4"VALVES ON CONDUCTOR. RIG DOWN FOSV AND HEAD PIN FROM TOP OF 4"DRILL PIPE. -PULL AND STAND BACK THE 4 STANDS OF 4" DRILL PIPE. -LAY DOWN THE MULE SHOE. -STAGE SUPER SUCKERS AND RIG UP TO SUCK OUT STACKAND CLEAN OUT CELLAR. -UNCLOG 4"CONDUCTOR VALVES AND DRAIN STACK INTO CELLAR. -UTILIZE SUPER SUCKERS TO CLEAN OUT CELLAR. -ESTABLISH FLOW RATES FROM 4" CONDUCTOR VALVES AND CONTINUE TO COLLECT SAMPLES. -7.4 BPH FROM 10:00-11:00. 6.7 BPH FROM 11:00-12:00. ' -6.4 BPH FROM 12:00-13:00. -6.1 BPH FROM 13:00-14:00. -5.8 BPH FROM 14:00-15:00. -5.7 BPH FROM 15:00-16:00. 5.5 BPH FROM 16:00-17:00. -5.5 BPH FROM 17:00-18:00. + 't, SIMOPS: -HOUSEKEEPING THROUGHOUT THE RIG. -PERFORM PREVENTATIVE MAINTENANCE ON PS-21 SLIPS AND RIG FLOOR EQUIPMENT. -ELECTRICIAN CONTINUES TO TROUBLESHOOT IDL OFF-LINE WHEN POSSIBLE. 18:00 - 19:30 1.50 CEMT N CEMT SURF RIG UP TO RUN IN THE HOLE WITH 4"DRILL PIPE TO DISPLACE 9-5/8"SURFACE CASING TO 9.9 PPG BRINE. -PULL BUSHINGS AND INSTALL PS-21 SLIPS. -MAKE UP 2 PIECE 9-5/8"LANDING JOINT. -RUN IN THE HOLE WITH 9-5/8"LANDING JOINT AND MAKE UP TO CASING HANGER. -CLOSE 21"ANNULAR PREVENTER ON LANDING JOINT. -BACK OUT AND LAY DOWN UPPER PUP OF 2 PIECE LANDING JOINT. -REMOVE PS-21 SLIPS AND INSTALL BUSHINGS. CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES. -5.1 BPH FROM 18:00-19:00. Printed 5/31/2016 2:14:19PM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 15 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:30 - 22:00 2.50 CEMT N CEMT SURF RUN IN THE HOLE WITH 8-1/2"MILL TOOTH BIT ON 4"DRILL PIPE STANDS FROM DERRICK TO 2606'MD. -MAKE UP USED 8-1/2"MILL TOOTH BIT,BIT SUB AND XO TO STAND OF 4"DRILL PIPE. -PU=70K LBS;SO=62K LBS AT 2600'MD. -TAG UP AT 2606'MD WITH 10K LBS. CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES. 4.5 BPH FROM 19:00-20:00. -4.5 BPH FROM 20:00-21:00. -4.2 BPH FROM 21:00-22:00. SIMOPS: -OFF LOAD 9.8 PPG BRINE TO ACTIVE PITS. -BUILD 40 BBL HIGH-VIS SPACER PILL. GENERAL HOUSEKEEPING. 22:00 - 00:00 2.00 CEMT N CEMT SURF PREPARE TO DISPLACE 9-5/8"SURFACE CASING. -CONTINUE TO OFF LOAD 9.8 PPG BRINE TO ACTIVE PITS. -MOVE 9.8 BRINE FROM RESERVE PITS TO ACTIVE PITS. CONTINUE TO BUILD 40 BBL HIGH-VIS SPACER PILL. CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES. -3.7 BPH FROM 22:00-23:00. -3.8 BPH FROM 23:00-23:59. 7/18/2014 00:00 - 01:30 1.50 CEMT 'N CEMT SURF DISPLACE 9-5/8"CASING FROM 9.7 PPG SPUD MUD TO 9.8 PPG BRINE. -420 GPM;623 PSI. -ROTATING 20 RPM;RECIPROCATING PIPE 45'. -40 BBL HIGH-VIS SPACER. -9.8 PPG BRINE IN AND OUT. CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES. -3.7 BPH FROM 00:00-01:00. 01:30 - 02:30 1.00 CEMT N CEMT SURF PULL OUT OF THE HOLE ON ELEVATORS FROM 2606'AND LAY DOWN 8-1/2"BIT. MONITOR WELL FOR 5 MIN:STATIC. -MUD WEIGHT:9.8 PPG IN,9.8 PPG OUT. -FILL PIPE EVERY 10 STANDS WITH MUD PUMP. -LAY DOWN BIT AND BIT SUB. CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES. -3.5 BPH FROM 01:00-02:00. Printed 5/31/2016 2.14.19PM "All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 16 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00.00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30©85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:30 - 03:00 0.50 CEMT N CEMT SURF RIG UP FOR E-LINE AND LOGGING RUNS. -MAKE UP 9-5/8"PUP JOINT FOR 2 PIECE LANDING JOINT. -FILL LANDING JOINT WITH 9.8 PPG BRINE. -INSTALL WIRE LINE BEAM NEAR TOOL CRANE DOOR. -CLEAN AND CLEAR RIG FLOOR FOR WIRE LINE OPERATIONS. CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES. -3.5 BPH FROM 02:00-03:00. 03:00 - 05:00 2.00 CEMT N CEMT SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES WHILE WAITING ON SCHLUMBERGER E-LINE. ' - -3.3 BPH FROM 03:00-04:00. -3.2 BPH FROM 04:00-05:00. SIMOPS: OFFLOAD MUD FROM PITS. -GENERAL HOUSEKEEPING AROUND RIG. -PERFORM PREVENTATIVE MAINTENANCE AND INSPECTIONS ON PRT CRANES IN PIPE -S.IED. 05:00 - 08:00 3.00 EVAL N CEMT SURF SPOT AND RIG UP SCHLUMBERGER E-LINE. -SPOT SCHLUMBERGER E-LINE UNIT. -RIG UP E-LINE SHEAVES ON RIG FLOOR. -NO PRESSURE CONTROL,ONLY AIR LINE WIPER. CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES. -3.2 BPH FROM 05:00-06:00. -3.0 BPH FROM 06:00-07:00 -3.0 BPH FROM 07:00-08:00 Printed 5/31/2016 2:14:19PM *AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 17 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date 7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00.00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:00 - 00:00 16.00 EVAL N CEMT SURF RUN IN HOLE WITH SLB ISOLATION SCANNER TO 2600'MD(9-5/8"FLOAT COLLAR AT 2608' MD). LOG FROM 2600'TO SURFACE AND MAKE REPEAT PASS FROM 550'MD TO SURFACE TO EVALUATE CEMENT BEHIND 9-5/8"CASING. CHANGEOUT TOOLS AND RUN IN HOLE WITH RST/TEMPERATURE LOGGING TOOLS TO 2600'MD. RUN TEMPERATURE LOG FROM 2600';MD TO SURFACE. HOLD PJSM WITH RIG CREW TO REVIEW HAZARD ANALYSIS FOR RST TOOL. PERFORM RST STATION ANALYSIS AT FOLLOWING DEPTHS,VARYING TOOL SETTINGS A$NEEDED: 260'MD(X3); 350'MD; 450'MD(X3); 550' MD; 300'MD; 750'MD; 2100'MD(X3); 2585'MD(X2); ( 2200'MD(X2); SEE AWGRS REPORT FOR DETAILED TIME SUMMARY OF SCHLUMBERGER LOGGING. CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, -1200 MG/L CHLORIDES;45°F. -2.8 BPH FROM 08:00-09:00 -2.7 BPH FROM 09:00-10:00 -2.7 BPH FROM 10:00-11:00 -2.6 BPH FROM 11:00-12:00 -2.6 BPH FROM 12:00-13:00 -2.6 BPH FROM 13:00-14:00 -2.6 BPH FROM 14:00-15:00 -2.4 BPH FROM 15:00-16:00 -2.4 BPH FROM 16:00-17:00 -2.4 BPH FROM 17:00-18:00 -2.4 BPH FROM 18:00-19:00 -2.3 BPH FROM 19:00-20:00 -2.3 BPH FROM 20:00-21:00 -2.2 BPH FROM 21:00-22:00 -2.2 BPH FROM 22:00-23:00 -2.0 BPH FROM 23:00-23:59 SIMOPS: -GENERAL HOUSEKEEPING THROUGH-OUT RIG. -WORK ON WEEKLY PREVENTATIVE MAINTENANCE ITEMS Printed 5/31/2016 2:14:19PM `AII depths reported in Drillers Depths* North America-ALASKA-BP • Page 18 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00.00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 7/19/2014 00:00 - 04:00 4.00 EVAL N CEMT SURF CONTINUE TO PERFORM RST STATION ANALYSIS AT FOLLOWING DEPTHS: 2300'MD; 2500'MD; 340'MD(X3); 330' MD; 320'MD; 310'MD; 360'MD; 500'MD; 650'MD SEE AWGRS REPORT FOR DETAILED TIME SUMMARY OF SCHLUMBERGER LOGGING. CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, -1200 MG/L CHLORIDES,45°F,11 pH -2.0 BPH FROM 00:00-01:00 -2.0 BPH FROM 01:00-02:00 -1.9 BPH FROM 02:00-03:00 1.9 BPH FROM 03:00-04:00 1.8 BPH FROM 04:00-05:00 04:00 - 05:00 1.00 EVAL N CEMT SURF RIG DOWN SCHLUMBERGER E-LINE AND LAY DOWN LOGGING TOOLS. HOLD PJSM WITH RIG CREW TO REVIEW HAZARD ANALYSIS FOR RST TOOL AND FOR RIGGING DOWN E-LINE. LAY DOWN RST TOOL TO PIPE SHED. -RIG DOWN E-LINE SHEAVES AND CLEAN AND CLEAR RIG FLOOR. { -1.8 BPH WATER FLOW FROM 05:00-06:00 v , J j Printed 5/31/2016 2:14:19PM *AII depths reported in Drillers Depths* North America-ALASKA-BP • Page 19 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) • Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: -_--- -....____-_-_-_------- Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:00 - 13:00 8.00 CEMT N CEMT SURF UNSUCCESSFULLY ATTEMPT TO RUN IN HOLE THROUGH 9-5/8"HANGER FLUTES WITH 1"CS HYDRIL PIPE FOR TOP JOB. -OPEN THE 21"ANNULAR PREVENTER DRAIN STACK THROUGH CONDUCTOR OUTLETS. -ATTEMPT TO WORK 1"PIPE DOWN FROM RIG FLOOR THROUGH FLUTES. ABLE TO RUN IN THROUGH 1 FLUTE TO NO-GO DEPTH OF 5'PAST HANGER(52'FROM RIG FLOOR). -PULL LANDING JOINT,RUN IN HOLE WITH STACK WASHER AND JET CLEAN FLUTED HANGER AREA. POOH WITH STACK WASHER TOOLAND DRAIN STACK. RE-INSTALL LANDING JOINT. -RE-ATTEMPT TO WORK 1"PIPE DOWN FROM RIG FLOOR THROUGH FLUTES. ABLE TO RUN IN THROUGH 1 FLUTE TO NO-GO DEPTH OF 5'PAST HANGER(52'FROM RIG FLOOR). BOTH CREWS HAVE REPEAT RESULTS. -DISCUSS RESULTS WITH ANCHORAGE TEAM. PLAN TO CONTINUE MONITORING -----WELL WHILE PERFORMING PROJECTS AROUND RIG. INSTALL OPEN FOSV IN TOP OF LANDING JOINT. CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, -1200 MG/L CHLORIDES,45°F,11 pH -1.8 BPH FROM 05:00-06:00 -1.8 BPH FROM 06:00-07:00 -1.8 BPH FROM 07:00-08:00 -1.8 BPH FROM 08:00-09:00 -1.6 BPH FROM 09:00-10:00 -1.6 BPH FROM 10:00-11:00 -1.4 BPH FROM 11:00-12:00 -1.1 BPH FROM 12:00-13:00 Printed 5/31/2016 2:14:19PM *AII depths reported in Drillers Depths* • North America-ALASKA-BP Page 20 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C.(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30©85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 00:00 11.00 CEMT N CEMT SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, -1200 MG/L CHLORIDES,45°F,11 pH -OPEN FOSV INSTALLED IN TOP OF LANDING JOINT. -1.1 BPH FROM 13:00-14:00 1.0 BPH FROM 14:00-15:00 -1.1 BPH FROM 15:00-16:00 -1.0 BPH FROM 16:00-17:00 -1.0 BPH FRAM 17:00-18:00 -1.0 BPH.FROM 18:00-19:00 -1.0 BPH FROM 19:00-20:00 -1.0 BPW FROM 20:00-21:00 -1.0 BPH FROM 21:00-22:00 -1.0 BPH FROM 22:00-23:00 -1.0 BPH FROM 23:00-23:59 (,. SIMOPS: -- -GENERAL HOUSEKEEPING THROUGH OUT RIG. -WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. -RIG DOWN AND REMOVE STABBING `BOARD FROM DERRICK. -OPEN BOP DOORS AND CLEAN FOR INSPECTION. -REMOVE GUARDS AND DRAIN OIL ON MUD PUMP 2 FOR INSPECTION. 7/20/2014 00:00 - 06:00 6.00 CEMT N CEMT '. SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, -1200 MG/L CHLORIDES,45°F,11 pH -1.0 BPH FROM 00:00-01:00 -1.0 BPH FROM 01:00-02:00 -1.0 BPH FROM 02:00-03:00 -0.9 BPH FROM 03:00-04:00 -0.9 BPH FROM 04:00-05:00 -0.9 BPH FROM 05:00-06:00 SIMOPS: -GENERAL HOUSEKEEPING THROUGH OUT RIG. -WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. -REMOVE GUARDS AND DRAIN OIL ON MUD PUMP 1 FOR INSPECTION. -CLEAN AND INSPECT PIPE CAT. -CLEAN AND PREP OVERHEAD TROLLEY CRANES FOR INSPECTION. -CLEAN AND INSPECT ROTARY TABLE. -WORK ON AUGER IN SHAKER DECK. Printed 5/31/2016 2:14:19PM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 21 of 26 Operation Summary Report Common Well Name:J-30 'AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30©85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 12:00 6.00 CEMT N CEMT SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, -1200 MG/L CHLORIDES,45°F,11 pH -0.9 BPH FROM 06:00-12:00 SIMOPS. -GENERAL HOUSEKEEPING THROUGH OUT RIG. 1-WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. -CLEAN AND PREP OVERHEAD TROLLEY CRANES FOR INSPECTION. -INSPECT MUD PUMP 1. -CLEAN AND PAINT EXPOSED METAL IN DERRICK. -ELECTRICIANS TROUBLESHOOT IRON DERRICK MAN. -FABRICATE NEW HYDRAULIC HOSE FOR •) FORUM CRANE. 12:00 - 18:00 6.00 CEMT N CEMT -SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID I REMAINS CLEAR FRESH WATER,8.4 PPG, 1-1500 MG/L CHLORIDES,45°F,11 pH -0.9 BPH FROM 12:00-18:00 SIMOPS: -GENERAL HOUSEKEEPING THROUGH OUT RIG. -WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. -CONTINUE TO INSPECT MUD PUMP 1. -CLEAN AND PAINT EXPOSED METAL IN DERRICK. -ELECTRICIANS TROUBLESHOOT IRON DERRICK MAN. -WELD STAIRS ON CATWALK. -CLEAN OUT DRIP PAN UNDER PIPE RACKS ON RIG FLOOR. 18:00 - 00:00 6.00 CEMT N CEMT SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, -1500 MG/L CHLORIDES,45°F,11 pH -0.9 BPH FROM 18:00-23:59 SIMOPS: -GENERAL HOUSEKEEPING THROUGH OUT RIG. -WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. -RIG DOWN POWERSHOE FOR IRON DERRICKMAN AND REPLACE CABLES. -BREAK DOWN HANDLING EQUIPMENT ON RIG FLOOR AND PREP FOR INSPECTION. Printed 5/31/2016 2:14:19PM *All depths reported in Drillers Depths* • North America-ALASKA-BP • Page 22 of 26 Operation Summary Report Common Well Name.J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date.7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 7/21/2014 00:00 - 06:00 6.00 CEMT N CEMT SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, -1500 MG/L CHLORIDES,45°F,11 pH -0.9 BPH FROM 00:00-06:00 SIMOPS: -GENERAL HOUSEKEEPING THROUGH OUT RIG. -WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. -BREAK DOWN HANDLING EQUIPMENT ON RIG FLOOR AND PREP FOR INSPECTION. -PREP TRAVELING BEAMS FOR INSPECTION -CLEAN AND PAINT EXPOSED METAL IN DERRICK. 06:00 - 12:00 6.00 CEMT N CEMT SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, 1500 MG/L CHLORIDES,40°F,11 pH 0.9 BPH FROM 06:00-12:00 SIMOPS: GENERAL HOUSEKEEPING THROUGH OUT RIG. 1 -WORK ON OFF CRITICAL PATH SUMMER t ` . MAINTENANCE PROJECTS. -BREAK DOWN HANDLING EQUIPMENT ON RIG FLOOR AND PREP FOR INSPECTION. -PREP TRAVELING BEAMS FOR INSPECTION -CLEAN AND PAINT EXPOSED METAL IN DERRICK -ELECTRICIANS TROUBLESHOOT AND REPAIR IRON DERRICK MAN. 12:00 - 18:00 6.00 CEMT N CEMT` SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, -1500 MG/L CHLORIDES,40°F,11 pH -0.9 BPH FROM 12:00-15:00 -0.8 BPH FROM 15:00-18:00 SIMOPS: -GENERAL HOUSEKEEPING THROUGH OUT RIG. -WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. -BREAK DOWN HANDLING EQUIPMENT ON RIG FLOOR AND PREP FOR INSPECTION. -INSPECT AND RE-INSTALL RAMS IN BOP STACK. -INSPECT MUD PUMP. -RIG DOWN SECONDARY KILL LINE TO WELLHOUSE. -ELECTRICIANS TROUBLESHOOT AND REPAIR IRON DERRICK MAN. Printed 5/31/2016 2:14:19PM *AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 23 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 00:00 6.00 CEMT N CEMT SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, -1500 MG/L CHLORIDES,38°F,11 pH -0.8 BPH FROM 18:00-23:59 SIMOPS: GENERAL HOUSEKEEPING THROUGH OUT RIG. -WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. -PREPARE HANDLING EQUIPMENT ON RIG FLOOR FOR INSPECTION. -FUNCTION TEST AND VERIFY HYDRAULIC PRESSURES ON PIPE CAT. 7/22/2014 00:00 - 06:00 6.00 CEMT N CEMT SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, -1500 MG/L CHLORIDES,38°F,11 pH -0.8 BPH FROM 00:00-06:00 ',SIMOPS: -GENERAL HOUSEKEEPING THROUGH OUT RIG. -WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. -WORK ON MUD PUMPS AND PREP FOR INSPECTION. -PREPARE HANDLING EQUIPMENT ON RIG FLOOR FOR INSPECTION. 06 00 - 00:00 18.00 CEMT N CEMT SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, -1500 MG/L CHLORIDES,34°F,11 pH -0.73 BPH FROM 06:00-00:00 SIMOPS: -GENERAL HOUSEKEEPING THROUGH OUT RIG. -WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. -WORK ON MUD PUMPS AND PREP FOR INSPECTION. -PREPARE HANDLING EQUIPMENT ON RIG FLOOR FOR INSPECTION. -TROUBLESHOOT IDL -MAKE UP DRY HOLE TREE TO TUBING SPOOL ADAPTER AND TUBING SPOOL Printed 5/31/2016 2:14:19PM *AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 24 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 7/23/2014 00:00 - 06:00 6.00 CEMT N CEMT SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, 1500 MG/L CHLORIDES,34°F,11 pH -0.75 BPH FROM 00:00-06:00 SIMOPS: -GENERAL HOUSEKEEPING THROUGH OUT RIG. -WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. -WORK ON MUD PUMPS AND PREP FOR INSPECTION. -PREPARE HANDLING EQUIPMENT ON RIG FLOOR FOR INSPECTION. 06:00 - 00:00 18.00 CEMT N CEMT i SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, -1700 MG/L CHLORIDES,33°F,10.6 pH -0.71 BPH FROM 06:00-00:00 SIMOPS: ' -GENERAL HOUSEKEEPING THROUGH OUT RIG. -WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. -WORK ON MUD PUMPS AND PREP FOR INSPECTION. -PREPARE HANDLING EQUIPMENT ON RIG FLOOR FOR INSPECTION. -L/D 89 STANDS OF 4"DP OUT OF DERRICK 7/24/2014 00:00 06:00 6.00 N CEMT SURF CONTINUE TO MONITOR 9-5/8"CSG X 20" CONDUCTOR ANNULUS;GENERAL HOUSEKEEPING AND PREVENTATIVE MAINTENANCE WORK. -0.7 BPH,33°F,FROM 00:00-0600 -06:00-PH=11.3,CHLORIDES=1600 MG/LAT 6AM SIMOPS: -GENERAL HOUSEKEEPING THROUGH OUT RIG -GATHER REMANING HARDLINES OFF THE RIG -RIG DOWN RIG TONGS AND DISSAMBLE AND CLEAN FOR INSPECTION -DISCONNECT STEAM LINES AND OTHER LINES THROUGHOUT THE RIG -PERFORM DERRICK INSPECTION -PREPARE HANDLING EQUIPMENT ON RIG FLOOR FOR INSPECTION. Printed 5/31/2016 2:14:19PM `AII depths reported in Drillers Depths* 1 North America-ALASKA-BP • Page 25 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 10:30 4.50 CEMT N CEMT SURF CONTINUE TO MONITOR 9-5/8"CSG X 20" CONDUCTOR ANNULUS;GENERAL HOUSEKEEPING AND PREVENTATIVE MAINTENANCE WORK. -0.67 BPH,33°F,FROM 06:00-10:30 SIMOPS: -GENERAL HOUSEKEEPING THROUGH OUT RIG -PREPARE HANDLING EQUIPMENT ON RIG FLOOR FOR INSPECTION -INSPECT'AND CLEAN SCREENS ON MUD PUMPS L/D 4 STANDS OF HWDP 10:30 - 12:00 1.50 RIGD N CEMT SURF CONTINUE TO'MONITOR 9-5/8"CSG X 20" CONDUCTOR ANNULUS;GENERAL HOUSEKEEPING AND PREVENTATIVE ( MAINTENANCE WORK. r'- -0.67 BPH,33°F SIMOPS: -PULL LANDING JOINT AND BELL NIPPLE -PREPARE TO NIPPLE DOWN DIVERTER SYSTEM 12:00 - 18:00 6.00 RIGD N CEMT SURF RECIEVE LEVEL 2 OCN FROM ODE TO NIPPLE DOWN DIVERTER SYSTEM,NIPPLE UP DRY HOLE TREE AND RIG DOWN/MOVE OFF, APPROVED BY DRILLING ENGINEERING MANAGER,WELLS OPERATIONS MANAGER, AND AOGCC -OCN INCLUDES JOINT AGREEMENT BETWEEN RIG AND WELLS GROUP REGARDING CUSTODY TRANSFER AND MONITORING PLAN POST RIG -BLOW DOWN KELLY HOSE,2ND KILL LINE, AND RIG DOWN FLOW LINE,FILL LINE AND DRAIN LINE -DE-ENGERGIZE KOOMEY -RIG DOWN DIVERTER(BAG) -RIG DOWN HIGH PRESSURE RISERS -RIG DOWN DIVERTER OUTLET LINE -CLEAN AND DRAIN PITS -DRAIN AND RIG DOWN CUTTINGS BOX -DISCONNECT LINES BETWEEN INTERCONNECTS SIMOPS: -CONTINUE TO MONITOR 9-5/8"CSG X 20" CONDUCTOR ANNULUS;GENERAL HOUSEKEEPING AND PREVENTATIVE MAINTENANCE WORK. -0.67 BPH,33°F Printed 5/31/2016 2:14:19PM *AII depths reported in Drillers Depths* • North America-ALASKA-BP • Page 26 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 00:00 6.00 RIGD N CEMT SURF NIPPLE UP FMC 21-1/4"X 11"SPOOL, ADAPTER FLANGE AND DRY HOLE TREE(SEE ATTACHED DRAWINGS/PICTURES) -LEAVE ALL TREE AND WELLHEAD VALVES OPEN WITH PRESSURE GAUGES. -DUE TO NO PRESSURE ISOLATION BETWEEN 9 5/8"CASING AND CONDUCTOR ANNULUS AND CONCERNS ABOUT POTENTIAL BROACHING BELOW THE CONDUCTOR SHOE AT 127'MD,TREE NOT PRESSURE TESTED PER OCN -FINAL WELL FLOW RATE=.6 BPH AT 33°F SIMOPS: CLEAN AND SECURE BOP DECK -CONTINUE RIGGING DOWN LINES BETWEEN DRILLERS MODULE AND MUD MODULE INTERCONNECTS -MOVE CUTTINGS BOX -RIG DOWN ALL MUD LINES,WATER LINES AND STEAM LINES -DRESS OUT RIG FLOOR,SPLIT BLOCKS CHECK AIR TIRE PRESSURE:GOOD NOTE: -RIG RELEASED AT 23:59 HRS -J-30 DRILLING OPERATIONS SUSPENDED (APPROVED BY AOGCC) -RIG TO MOVE OFF AND COMPLETE ANNUAL MAINTENANCE -PER APPROVED OCN WELL MONITORING WILL BE OFFICIALLY HANDED OVER TO WELLS GROUP UPON REMOVAL OF THE DUMMY WELLHOUSE. Printed 5/31/2016 2:14:19PM *AII depths reported in Drillers Depths* • J-30 Well History n..str #, .i9`^ Monitor cellars for inflow. (Eval fluid flow from conductor). Hand over from Parker 272 to WIE(R. Holt)&DHD (K. Womac)done. Cellar inflow was 0.6 bbls/hr @ time of hand over(-7:30 pm). Monitored cellar inflow throughout shift. See log for details. 7/25/2014 ***Job continued on 07-26-14 AWGRS WSR*** ***Job continued from 07-25-14 AWGRS WSR*** Monitored conductor outflow into cellar&well row for activity. See log for details. 7/26/2014 ***Continued on 7/27/14*** ***Job continued from 07-26-14 AWGRS WSR*** Monitored conductor outflow into cellar&well row for activity. See log for details.__ 7/27/2014 ***Job continued on 7-28-14 WSR*** ***Job continued from 07-27-14 AWGRS WSR***_ Monitored conductor outflow into cellar&well row for activity. See log for details. 7/28/2014 ***Job continued on 7-29-14 WSR*** ***Job continued from 07-27-14 AWGRS WSR*** Monitored conductor outflow into cellar&well row for activity. See log for details.-- 7/28/2014 etails.-7/28/2014 ***Job continued on 7-29-14 WSR*** ***Job continued from 07-28-14 AWGRS WSR***- Monitored conductor outflow into cellar&well row for activity. Collected fluid sample from reserve pit. Installed a measuring stick in reserve pit. See log for details. - 7/29/2014 ***Job continued on 7-30-14 WSR*** **Continued from 07-29-14**' Monitored conductor outflow into cellar&well row for activity. Test flow and PH readings 7/30/2014 every 6 hours. See log for details. **Continued from 07-29-14** Monitored conductor outflow into cellar&well row for activity. Test flow and P_H every 6 7/30/2014 hours. See log for details. **Continued from 07-30-14** RU diaphragm pump for evacuation of fluid from cellar to OT. Monitored conductor outflow into cellar&well row for activity. Test flow and PH readings every 6 hours. See log for details. 7/31/2014 Evacuated -2.5 bbl from cellar with diaphragm pump. Left pump rigged to OT for further 11" of water in cellar(measurement taken next to conductor outflow). PH reading of 7/31/2014 11.8. Evacuated -2. bbl from cellar with diaphragm pump. Left pump rigged to OT for Flow rate of.21 bbls/hr taken. 11"of water in cellar(measurement taken next to conductor outflow). PH reading of 11.8 Evacuated-2. bbl from cellar with diaphragm 8/1/2014 pump. Unable to get good strap on OT(Tank is sitting unlevel). Left pump rigged to OT 7" of water in cellar(measurement taken next to conductor outflow). PH reading of 12.0. Evacuated -1.25. bbl from cellar with diaphragm pump. Left pump rigged to OT for 8/1/2014 further use. 15:00 13"of water in cellar(measurement taken next to conductor outflow). PH reading of 12.3. Evacuated -2. bbl from cellar with diaphragm pump. Left pump rigged to OT for 8/2/2014 further use. Cellar water is slightly pink in color. Collected cellar fluid sample. 12"of water in cellar(measurement taken next to conductor valve). PH reading 12.5. Evacuated -1.7 bbls from cellar with diaphragm pump. 8/3/2014 Cellar water light pink in color. Job ongoing. 14:50 hrs. 6.5"of water in cellar(measurement taken next to conductor valve). PH = 12.2. Evacuated -.5 bbls from cellar with diaphram pump to OT tank. Water in cellar light pink 8/4/2014 in color. Job ongoing. 09:00. 3"of water in cellar(measurement taken next to conductor valve). Water dripping from conductor pipe @-1 drip per second. Water in cellar light pink in color. Did not 8/5/2014 evacuate. Job ongoing. 06:00. • • J-30 Well History 4.5"of water in cellar(measurement taken next to conductor valve handle). Water dripping from conductor pipe @ -1 drip per second. Water in cellar light pink in color with a PH of 12.0. 8/5/2014 Job ongoing 20:30 5" of water in cellar(measurement taken next to conductor valve handle). Water dripping from conductor pipe @ -1 drip per second. Water in cellar light pink in color 8/6/2014 with a PH of 12.1. 5"of water in cellar(measurement taken next to conductor valve handle). Water dripping from conductor pipe @ 1 drop every 3 seconds. Water in cellar is light pink. P 8/7/2014 Job ongoing. 03:55. 5"of water in cellar(measurement taken next to conductor valve handle). Water dripping from condutor pipe @ 1 drop every 4 seconds. Water in cellar is light pink. 8/8/2014 Job ongoing. 03:30 5"of water in cellar(measurement taken next to conductor valve handle). Water dripping from conductor pipe @ 1 drop every 6 seconds. Water in cellar is light pink. 8/8/2014 Job ongoing. 23:30 5"of water in cellar(measurement taken next to conductor valve handle). Water dripping from conductor pipe @ 1 drop every 11 seconds. Water in cellar is light pink. 8/9/2014 Did not evacuate cellar. Hung a sample jar below conductor pipe. Job ongoing. 1220 5.25"of water in cellar(measurement taken next to conductor valve handle). Water dripping from conductor pipe @ 1 drop every 11 seconds. Water is light pink. Did not 8/10/2014 evacuate cellar. Emptied sample bottle(full on arrival). PH reading of 12.3. Job 5.5"of water in cellar(measured from next to conductor valve handle). Water dripping from conductor pipe @ 1 drop every 13 seconds. Water is pink in color. PH taken from 8/11/2014 jar= 12.6. Job ongoing. 12:10. 5.25"of water in cellar(No change), (measurement taken next to conductor valve handle). water dripping from conductor pipe @ 1 drop every 11 sec. fluid in sample bottle 8/12/2014 and cellar is pink. sample bottle was full (emptied). PH reading of 11.4. Job ongoing 5.25" of water in cellar. (Measurement taken next to conductor valve handle). water dripping from conductor pipe @ 1 drop every 14 seconds. Fluid in sample bottle and 8/13/2014 cellar is pink. PH reading of 11.5. Job ongoing. 09:30 hrs observable dripping from conductor pipe. Fluid in sample bottle and cellar is pink. Job ongoing. 1130 8/14/2014 6.25"of fluid in cellar(Measurement taken next to conductor valve handle). No observable dripping from conductor pipe. Fluid sample taken for lab, sample has a pink 8/15/2014 tinge. Job ongoing. 10:50 IAP =0 psi. Temp= SI. WHPs(vac cellar if needed). No AL. Wellhouse,flowline, SSV, and tree scafold removed. Fluid depth in cellar 6 1/4"measured from valve handle. No dripping coming from circ port. Sucked out cellar with rigged up pump. Fluid level 8/16/2014 remains @ 4". 2"of fluid in cellar. (Measurement taken next to conductor valve handle). Water 8/17/2014 dripping from conductor pipe @ 1 drop every 20 seconds. 13:00 hrs. 1"of fluid in cellar. (Measurement taken next to conductor valve handle). Fluid dripping 8/18/2014 from conductor pipe @ 1 drop every 12 seconds. 0915. T/I/O =3"of fluid in cellar. (Measurement taken next to the valve handle. Unable to 8/19/2014 detect fluid dripping from conductor pipe. Currently raining outside. 0900. 3"of fluid in cellar. (Measurement taken next to conductor valve handle). Fluid dripping from conductor pipe @ 1 drop every 30 seconds. 1430 hrs.. 8/20/2014 • J-30 Well History 1"of fluid in cellar. (Measurement taken next to the valve handle). Unable to detect fluid dripping from conductor pipe. 8/21/2014 0230. 1"of fluid in cellar. (Measurement taken next to conductor valve handle). Fluid dripping from conductor pipe @ 1 drop every 13 seconds. Intermittent light rain. 1010 hrs..- H 8/22/2014 Void pressure= 0 psi. —2"of fluid in a small section of the cellar(less than 50% of cellar has fluid, only in low spots). Fluid dripping from conductor pipe every—20-25 seconds. 8/23/2014 No wellhouse/well shelter over well/cellar. 11:15 2"of fluid in cellar(Measurement taken next to conductor valve handle). Cellar does not 8/24/2014 have fluid throughout. Fluid dripping from conductor pipe every 23 seconds. 12:30. 2"of fluid in cellar(Measuremend next to conductor valve handle). Fluid dripping fron 8/26/2014 conductor pipe @ 20-23 second intervals. 1040 hrs. 3.5"of fluid in cellar(Measurement taken next to conductor valve handle). Cellar does 8/27/2014 not have fluid throughout. Fluid dripping from conductor pipe every 20 seconds. 10:30 4"of fluid in cellar(measured from the conductor valve handle). Fluid dripping from conductor pipe every 9 seconds. Snow fell on the site on 8/28 &8/29/14. 8/30/2014 1400. 5.5"of fluid in cellar(measurment taken from the conductor valve handle). Fluid dripping 8/31/2014 from the conductor pipe every—6 seconds. Rigged down diaphragm pump and lines. 5.5" of fluid in cellar(measurement taken from the conductor valve handle). Fluid 9/5/2014 dripping from conductor pipe every 9 seconds. 5.5"of fluid in cellar(measurement taken from conductor valve handle). Fluid dripping 9/9/2014 from conductor pipe every 13 seconds. 5.5"of fluid in cellar(Measurement taken from conductor valve handle). Fluid dripping 9/12/2014 from conductor pipe every 7-8 seconds. Wellhouse#L-120 sitting over well. —5.5"of fluid in cellar. Measurement taken from conductor valve handle. Difficult to reach. Plywood over entire cellar and stuffed under 9/18/2014 frame of well house. Fluid dripping from conductor pipe every 10-12 seconds (per —5.5"of fluid in cellar. Measurement taken from the 11 O'clock position gap in plywood. 9/21/2014 Fluid dripping from conductor pipe every 8-10 seconds. —5.5"of fluid in cellar. Measurment taken from the 11 o'clock position, near the casing 9/25/2014 valve. Fluid dripping from the conductor pipe every 10-11 seconds. T/I = 0/0. Temp = SI. WHPs (verify tree gauges are properly calibrated). Tree gauges are reading properly.-1 8/9/2015 SV= C. MV= O. IA= OTG. 0130 hrs. T= 0. Temp = SI. T FL, pictures (Eval MIT). No flowline&scaffolding. T FL near surface. Plywood installed for floor grating. Took pictures of well. 11/13/2015 SV, MV= C. IA= OTG. 03:00. • • North America - ALASKA - BP Prudhoe Bay PB J Pad J-30 J-30 Design: J-30 Survey Report - Geographic 31 May, 2016 � �\ 2\? �� • Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-30 Project Prudhoe Bay TVD Reference: J-30 @ 85.40usft(Parker 272) Site: PB J Pad MD Reference: J-30 @ 85.40usft(Parker 272) Well• J-30 North Reference: True Wellbore: J-30 Survey Calculation Method: Minimum Curvature Design: J-30 Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB J Pad,TR-11-13 Site Position: Northing: 5,968,224.220usft Latitude: 70°19'14.845 N From: Map Easting: 641,155.790usft Longitude: 148°51'20.092 W 11 Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.08 ° Well J-30 API No. 500292351500 Well Position +N/-S 0.00 usft Northing: 5,970,565.290 usft Latitude: 70°19'37.504 N +E/-W 0.00 usft Easting: 643,106.000 usft Longitude: 148°50'21.883 W Position Uncertainty 0.00 usft Wellhead Elevation: 32.00 usft Ground Level: 38.30 usft Wellbore J-30 API no. 500292351500 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2013 7/31/2014 19.62 81.01 57,625 Design J-30 .. Audit Notes: Version: Phase: ACTUAL Tie On Depth: 47.10 it Depth(ft(WD)a ;=: , wDirection ) (usft) (usft) 47.10 0.00 0.00 326.05 I Survey Program Date: 5/14/2016 From To (usft) (usft) Survey(Wellbore) Tool Name Description 127.00 1,233.00 Gyro SS(J-30) GYD-GC-SS Gyrodata gyro single shots 1,248.08 2,637.26 MWD(J-30) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 5/31/2016 11:29:11AM Page 2 COMPASS 5000.1 Build 818 • • Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-30 Project: Prudhoe Bay TVD Reference: J-30 @ 85.40usft(Parker 272) Site: PB J Pad MD Reference: J-30 @ 85.40usft(Parker 272) Well: J-30 North Reference: True Wellbore: J-30 Survey Calculation Method: Minimum Curvature Design: J-30 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting „(usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 47.10 0.00 0.00 47.10 0.00 0.00 5,970,565.290 643,106.000 70°19'37.504 N 148°50'21.883 W 127.00 0.03 215.66 127.00 -0.02 -0.01 5,970,565.273 643,105.988 70°19'37.503 N 148°50'21.883 W 172.00 0.14 42.31 172.00 0.01 0.02 5,970,565.304 643,106.018 70°19'37.504 N 148°50'21.882 W 268.00 0.12 331.76 268.00 0.19 0.05 5,970,565.480 643,106.046 70°19'37.505 N 148°50'21.881 W 361.00 0.13 60.34 361.00 0.33 0.09 5,970,565.619 643,106.089 70°19'37.507 N 148°50'21.880 W 450.00 0.38 23.75 450.00 0.65 0.30 5,970,565.943 643,106.289 70°19'37.510 N 148°50'21.874 W 479.00 0.43 30.05 479.00 0.83 0.39 5,970,566.127 643,106.379 70°19'37.512 N 148°50'21.871 W 573.00 0.74 3.68 572.99 1.74 0.61 5,970,567.042 643,106.577 70°19'37.521 N 148°50'21.865 W 667.00 1.62 341.01 666.97 3.60 0.22 5,970,568.896 643,106.148 70°19'37.539 N 148°50'21.876 W 763.00 3.84 336.62 762.86 7.84 -1.50 5,970,573.097 643,104.350 70°19'37.581 N 148°50'21.926 W 857.00 4.37 333.03 856.62 13.92 -4.37 5,970,579.121 643,101.362 70°19'37.641 N 148°50'22.010 W 951.00 6.74 316.57 950.17 21.12 -9.79 5,970,586.215 643,095.809 70°19'37.711 N 148°50'22.168 W 1,045.00 9.49 305.19 1,043.23 29.59 -19.92 5,970,594.494 643,085.522 70°19'37.795 N 148°50'22.464 W 1,140.00 9.10 303.32 1,136.98 38.23 -32.60 5,970,602.890 643,072.682 70°19'37.880 N 148°50'22.834 W 1,233.00 8.56 299.57 1,228.88 45.69 -44.76 5,970,610.111 643,060.378 70°19'37.953 N 148°50'23.189 W 1,248.08 8.24 297.93 1,243.80 46.75 -46.69 5,970,611.134 643,058.427 70°19'37.963 N 148°50'23.246 W 1,342.07 7.61 297.61 1,336.89 52.79 -58.16 5,970,616.953 643,046.849 70°19'38.023 N 148°50'23.580 W 1,436.52 6.68 289.80 1,430.61 57.55 -68.87 5,970,621.507 643,036.051 70°19'38.070 N 148°50'23.893 W 1,531.30 6.81 282.30 1,524.73 60.61 -79.55 5,970,624.367 643,025.318 70°19'38.100 N 148°50'24.205 W 1,625.82 7.43 272.74 1,618.53 62.10 -91.13 5,970,625.632 643,013.712 70°19'38.114 N 148°50'24.543 W 1,719.34 7.52 269.06 1,711.25 62.28 -103.29 5,970,625.589 643,001.553 70°19'38.116 N 148°50'24.898 W 1,814.34 8.01 267.45 1,805.38 61.89 -116.11 5,970,624.948 642,988.736 70°19'38.112 N 148°50'25.272 W 1,909.33 9.97 257.94 1,899.21 59.88 -130.77 5,970,622.656 642,974.122 70°19'38.092 N 148°50'25.700 W 2,004.52 10.97 246.75 1,992.82 54.58 -147.15 5,970,617.047 642,957.846 70°19'38.040 N 148°50'26.178 W 2,100.37 10.67 245.40 2,086.97 47.28 -163.60 5,970,609.441 642,941.542 70°19'37.969 N 148°50'26.658 W 2,194.74 10.35 238.80 2,179.76 39.26 -178.79 5,970,601.125 642,926.503 70°19'37.890 N 148°50'27.102 W 2,288.86 10.89 222.09 2,272.29 28.27 -191.99 5,970,589.896 642,913.522 70°19'37.782 N 148°50'27.487 W 2,384.01 10.22 203.94 2,365.85 13.89 -201.44 5,970,575.330 642,904.346 70°19'37.640 N 148°50'27.763 W 2,478.96 8.85 193.22 2,459.49 -0.93 -206.53 5,970,560.426 642,899.541 70°19'37.494 N 148°50'27.911 W 2,573.65 8.54 191.30 2,553.10 -14.91 -209.57 5,970,546.386 642,896.765 70°19'37.357 N 148°50'28.000 W 2,637.26 8.53 191.35 2,616.00 -24.17 -211.43 5,970,537.097 642,895.088 70°19'37.266 N 148°50'28.054 W 2,698.00 8.53 191.35 2,676.07 -33.00 -213.20 5,970,528.232 642,893.484 70°19'37.179 N 148°50'28.106 W Projection to TD 5/31/2016 11:29:11AM Page 3 COMPASS 5000.1 Build 818 • • Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-30 Project: Prudhoe Bay TVD Reference: J-30 @ 85.40usft(Parker 272) Site: PB J Pad MD Reference: J-30 @ 85.40usft(Parker 272) Well: J-30 North Reference: True Wellbore: J-30 Survey Calculation Method: Minimum Curvature Design: J-30 Database: EDM R5K-Alaska PROD-ANCP1 i Targets Target Name -hit/miss target Dip Angle Dip Dir. TVD +N/-S +El-W Northing Easting -Shape (°) (0) (usft) (usft) (usft) (usft) (usft) Latitude Longitude T#4A 0.00 0.00 9,037.40 -1,935.34 -3,693.87 5,968,560.000 639,450.000 70°19'18.461 N 148`52'9.684 W -actual wellpath misses target center by 7496.70usft at 2698.00usft MD(2676.07 TVD,-33.00 N,-213.20 E) -Point T#3 0.00 0.00 9,040.40 -2,068.79 -2,466.09 5,968,450.000 640,680.000 70°19'17.153 N 148°51'33.852 W -actual wellpath misses target center by 7051.57usft at 2698.00usft MD(2676.07 TVD,-33.00 N,-213.20 E) -Point J-30 Geo-Polygon 0.00 0.00 85.40 -2,007.57 -2,004.81 5,968,520.000 641,140.000 70°19'17.757 N 148°51'20.390 W -actual wellpath misses target center by 2837.18usft at 86.13usft MD(86.13 TVD,0.00 N,0.00 E) -Polygon Point 1 85.40 0.00 0.00 5,968,520.00 641,140.00 Point 2 85.40 99.34 -488.23 5,968,610.00 640,650.00 Point3 85.40 223.74 -1,766.19 5,968,710.00 639,370.00 Point4 85.40 238.24 -2,526.11 5,968,710.00 638,610.00 Point 5 85.40 -2.12 -2,510.69 5,968,470.00 638,630.00 Point 6 85.40 -289.21 -45.53 5,968,230.00 641,100.00 Point? 85.40 0.00 0.00 5,968,520.00 641,140.00 T#1 TSGR 0.00 0.00 8,530.40 -2,358.22 -1,451.35 5,968,180.000 641,700.000 70°19'14.309 N 148°51'4.236 W -actual wellpath misses target center by 6419.72usft at 2698.O0usft MD(2676.07 TVD,-33.00 N,-213.20 E) -Circle(radius 10.00) T#6 New TD 0.00 0.00 8,635.40 -1,881.80 -4,403.03 5,968,600.000 638,740.000 70°19'18.984 N 148°52'30.381 W -actual wellpath misses target center by 7515.74usft at 2698.O0usft MD(2676.07 TVD,-33.00 N,-213.20 E) -Point T#2 0.00 0.00 9,060.40 -2,103.56 -2,216.69 5,968,420.000 640,930.000 70°19'16.812 N 148°51'26.573 W -actual wellpath misses target center by 7004.34usft at 2698.O0usft MD(2676.07 TVD,-33.00 N,-213.20 E) -Point T#4 0.00 0.00 9,037.40 -1,933.24 -3,803.85 5,968,560.000 639,340.000 70°19'18.481 N 148°52'12.894 W -actual wellpath misses target center by 7547.86usft at 2698.O0usft MD(2676.07 TVD,-33.00 N,-213.20 E) -Point T#5 0.00 0.00 8,787.40 -1,881.80 -4,403.03 5,968,600.000 638,740.000 70°19'18.984 N 148°52'30.381 W -actual wellpath misses target center by 7636.82usft at 2698.O0usft MD(2676.07 TVD,-33.00 N,-213.20 E) -Point L.Casing Points Measured Vertical Casing Hole ..- Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 2.693 97 2,672.08 SURFACE CASING 9.625 12.250 Design Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (usft) (usft) (usft) (usft) Comment 2,698.00 2,676.07 -33 00 -213.20 Projection to TD Checked By: Approved By: Date: 5/31/2016 11:29:11AM Page 4 COMPASS 5000.1 Build 818 • Lastufka, Joseph N From: Schwartz, Guy L (DOA) <guy.schwartz@alaska.gov> Sent: Tuesday, November 17, 2015 3:37 PM To: Sternicki, Oliver R; Loepp, Victoria T (DOA) Cc: Lastufka, Joseph N;Worthington, Aras J; Daniel, Ryan Subject: RE:J-30 Sundry for Suspend (w/pics) 315-423 Categories: CAUTION: External email —increased risk of phishing Oliver, Agree that pressure testing surface casing would be problematic based on the how the wellhead was left(conductor x surface casing open) . J-30 is safe to leave as is for the short term to track fluid migration up the conductor x surf casing annulus. Well status will be suspended with the intention to fully P&A once offset wells are drilled and completed to see if any further fluid flow develops. Regards, Guy Schwartz Sr. Petroleum Engineer AOGCC 907-301-4533 cell 907-793-1226 office CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Guy Schwartz at(907-793-1226) or(Guy.schwartz@alaska.gov). From: Sternicki, Oliver R [mailto:Oliver.Sternicki©bp.com] Sent: Tuesday, November 17, 2015 3:03 PM To: Schwartz, Guy L (DOA); Loepp, Victoria T(DOA) Cc: Lastufka, Joseph N; Worthington, Aras J; Daniel, Ryan Subject: RE: J-30 Sundry for Suspend 315-423 Guy, I've attached some pictures for you to take a look at regarding the current configuration of J-30. Per our conversation you did not see a need to conduct a pressure test at this time taking into consideration the current configuration of the well and the test requiring the setting of a treating packer to isolate the surface casing from the conductor. We will move forward with closing out sundry 315-423 and changing the status of this well to suspended. Regards, Oliver Sternicki WO Well Integrity Engineer BP Exploration Alaska Office: 1 (907) 564 4301 Cell: 1 (907) 350 0759 oliver.sternicki(abp.com 1 VIE• 4 VW OW M J-30 PAPAL rte,al 45 x SUSPENDED acv• KOP AaO►- __'V.— :. 4ffi .-'D xs•tANiSU;1EORRIVE* MCC ES UhwwU 20°X Er I.LA1W WOOLLIER 90' ♦V V V V 1 V V V 11S.R civ,40i.1.409fG 0.•as°I-�1/P4" w**r c**-0-**, OA7F IHV RV QtysflRS pAIE PEV ev CEPANH S L482YC1F SAY INT POEM PPM?,MTN,(www M1I Lin avn914 -ERAS FD EXPECIOPV Paw P ?1407040 . ••... .•... AR PE SESE-7351... SEC 0,Tim Mak.IPP{+L 4%At, Bioleratios(Airs kat From: Schwartz, Guy L (DOA) [mailto:guy.schwartz©alaska.gov] Sent: Thursday, November 12, 2015 3:30 PM To: Sternicki, Oliver R; Loepp, Victoria T(DOA) Cc: Lastufka, Joseph N; Worthington, Aras J Subject: RE: J-30 Sundry for Suspend 315-423 Oliver, Discussed this with Commissioner Forester and we agree with your assessment as presented below. Makes more sense in the short term to use this a monitoring well with the capability to do some remedial cementing if needed. 2 Please close out the sundry 315-42.sending a 10-407 with the attached exibtion and email correspondence approving the suspension "as is"with no further cementing of the wellbore. Please attach the 9 5/8" casing pressure test data if it has not already been submitted. Regards, Guy Schwartz Sr. Petroleum Engineer AOGCC 907-301-4533 cell 907-793-1226 office CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Guy Schwartz at(907-793-1226)or(Guv.schwartz@alaska.gov). From: Sternicki, Oliver R [mailto:Oliver.Sternicki0bp.com] Sent: Thursday, November 12, 2015 12:42 PM To: Loepp, Victoria T(DOA) Cc: Lastufka, Joseph N; Schwartz, Guy L (DOA) Subject: J-30 Sundry for Suspend Victoria, The attached sundry was approved by the commission to put J-30 into suspended status after it went ops shutdown last July. The ops shutdown was due to shallow water flowing between the conductor and surface casing after the surface casing cement job, prior to drilling out the shoe track. After the rig moved off the well the shallow water flow slowed and eventually stopped. We don't know exactly what the source or cause of the water was, and it was decided that we did not want to continue to complete the well based on the potential surface hazards to operations and management of a continued shallow water flow event. The primary theory is that the flow stemmed from thawing of the permafrost due the rig circulating warm fluids during the initial construction of the well and the flow eventually stopped after the rig left when the permafrost froze back. The wells adjacent to J-30 have not been active for a number of years so everything was in a static state up to the point the rig began drilling J-30. Just recently J-03 had a RWO, has returned to operable status and will soon be online. J-01 is planned to be online after some surface piping work is completed around the first of the year. These wells are on either side of J-30 at about 35' and 75' spacing. IfJ-30 is cemented to surface and the thaw bulb from J-01 or J-03 results in the reactivation of the surface water flow in J-30 we would have limited options in stemming the flow other than shutting in those wells. IfJ-30 was left in its current state and the surface flow reactivated we have the option of performing of perf/cement squeezing the flow. Would it be acceptable with to the AOGCC to make the well suspended in its current state (no cement as previously planned) with the cemented shoe track and unperforated 9 5/8" casing. BPXA would propose cementing the well bore as planned previously, no future utility, in a 2017 time frame depending on the J pad surface water flow findings and mitigations. Regards, Oliver Sternicki W IsSoba#~Ws of panes*tows Well Integrity Engineer BP Exploration Alaska Office: 1 (907) 564 4301 Cell: 1 (907) 350 0759 3 • Schwartz, Guy L (DOA) From: Schwartz, Guy L(DOA) Sent: Thursday, November 12, 2015 3:30 PM To: 'Sternicki, Oliver R'; Loepp, Victoria T (DOA) Cc: Lastufka,Joseph N; aras.worthington@bp.com Subject: RE:J-30 Sundry for Suspend 315-423 (PTD 214-075) Oliver, Discussed this with Commissioner Forester and we agree with your assessment as presented below. Makes more sense in the short term to use this a monitoring well with the capability to do some remedial cementing if needed. Please close out the sundry 315-423 by sending a 10-407 with the attached explanation and email correspondence approving the suspension "as is "with no further cementing of the wellbore. Please attach the 9 5/8" casing pressure test data if it has not already been submitted. Regards, Guy Schwartz Sr. Petroleum Engineer AOGCC 907-301-4533 cell 907-793-1226 office CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Guy Schwartz at(907-793-1226) or(Guv.schwartz@alaska.gov). From: Sternicki, Oliver R[mailto:Oliver.Sternicki@abp.com) Sent: Thursday, November 12, 2015 12:42 PM • To: Loepp, Victoria T(DOA) Cc: Lastufka, Joseph N; Schwartz, Guy L (DOA) Subject: J-30 Sundry for Suspend Victoria, The attached sundry was approved by the commission to put J-30 into suspended status after it went ops shutdown last July. The ops shutdown was due to shallow water flowing between the conductor and surface casing after the surface casing cement job, prior to drilling out the shoe track. After the rig moved off the well the shallow water flow slowed and eventually stopped. We don't know exactly what the source or cause of the water was,and it was decided that we did not want to continue to complete the well based on the potential surface hazards to operations and management of a continued shallow water flow event. The primary theory is that the flow stemmed from thawing of the permafrost due the rig circulating warm fluids during the initial construction of the well and the flow eventually stopped after the rig left when the permafrost froze back. The wells adjacent to J-30 have not been active for a number of years so everything was in a static state up to the point the rig began drilling 1-30. Just recently 1-03 had a RWO, has returned to operable status and will soon be online. 1-01 is planned to be online after some surface piping work is completed around the first of the year. These wells are on either side of J-30 at about 35' and 75'spacing. If J-30 is cemented to surface and the thaw bulb from 1-01 or J-03 results in the reactivation of the surface water flow in J-30 we would have limited options in stemming the flow other than shutting in those wells. If 1-30 was left in its current state and the surface flow reactivated we have the option of performing of perf/cement squeezing the flow. 1 • Would it be acceptable with to the AOGCC to make the well suspended in its current state (no cement as previously ' planned)with the cemented shoe track and unperforated 9 5/8" casing. BPXA would propose cementing the well bore as planned previously, no future utility, in a 2017 time frame depending on the J pad surface water flow findings and mitigations. Regards, Oliver Sternicki WO "Sobel wells Well Integrity Engineer BP Exploration Alaska Office: 1 (907) 564 4301 Cell: 1 (907) 350 0759 oliver.sternickiabp.com 2 A., car rift /``���������i%g�, THE STATE Alaska Oil and Gas Y 114 I .% "'A Of Conservation Commission 333 West Seventh Avenue A-- GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907 279 1433 LA Fax 907.276.7542 www.aogcc.alaska.gov Aras Worthington Wells Engineer _ O BP Exploration (Alaska), Inc. 1 76-) P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU J-30 Sundry Number: 315-423 Dear Mr. Worthington: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy P. oerster Chair DATED this & day of August, 2015 Encl. STATE OF ALASKA , , •,,, .ALASKA OIL AND GAS CONSERVATION COMM N APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug Perforations o Fracture Stimulate 0 Pull Tubing ❑ Operations shutdown❑ Suspend p • Perforate o Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill ❑ Perforate New Pool ❑ Repair Well 0 Re-enter Susp Well 0 Other 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: • 5. Permit to Drill Number: 214-075 3. Address: P.O.Box 196612 Anchorage,AK Exploratory ❑ Development II 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-23515-00-00 • 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? i, Will planned perforations require a spacing exception? Yes 0 No Q PBU J-30 • t,L 1 9. Property Designation(Lease Number): 10. Field/Pools: / ADL 0028282,t t L.0 2}2`tt ��-7.tr;ti; PRUDHOE BAY,PRUDHOE OIL ' MS o d/ 4 I' S 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured): 2698 2676 2608 2587 None None Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20"91.5#H-40 48'-128' 48'-128' 1490 470 Surface 2647' 9-5/8"40#L-80 47'-2694' 47'-2672' 5750 3090 Intermediate Production Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): None None None Packers and SSSV Type: No Packer Packers and SSSV MD(ft)and TVD(ft): No Packer No SSSV Installed No SSSV Installed 12.Attachments: Description Summary of Proposal 0 13.Well Class after proposed work: BOP Sketch 0 Detailed Operations Program ❑ Exploratory 0 Stratigraphic 0 Development 0 Service 0 14.Estimated Date for Commencing Operations: October 15,2015 15. Well Status after proposed work: Oil 0 Gas 0 WDSPL 0 Suspended IZI• 16.Verbal Approval: Date: WINJ 0 GINJ 0 WAG 0 Abandoned 0 Commission Representative: Op Shutdown ❑ GSTOR 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Worthington,Aras J Email Aras.Worthington@bp.com Printed Name Worthington,Aras J Title Wells Engineer Signature 7/1 .,_ � Phone +1 907 564-4102sZ7 Date COMMISSION USE ONLY Conditions of approval:Notify Commission so that a representative may witness Sundry Number: 315- `123 Plug Integrity BOP Test ❑ Mechanical Integrity Test LI Location Clearance e Other: A/'G it,'f flUGCC 1'� S-rteto "— ? Phofa dOCc''ra-rtnf I-141fo /1bL h , �✓ - lvifs-:t55 rraL �i'rtd 71-0 c Fr;rr>" Cr"w, �.., � i-a 5tr +- cc Z. ln/t`1--7t55 e'f off pr--,(0.-- f-o 1Aeld+-t, plct.+'Z 3, 51 tr C/farrar�tcc ApproVa_ f Spacing Exception Required? Yes 0 No SubsequentForm Required: ib— 4 o APPROVED BYTHE Approved by:C./L.10) COMMISSIONER COMMISSION Date: Qom/ /s v�ri- s/5-// --- RBDMSJ QUG 11 4 1015 ORIGINAL .,/ .6 7 Lc, /S--- Submit Form " '— Attachments in Duplicate Form 10-403 Revised 5/2015 Approved application is valid for 12 months from the date of approval. S • 1044 J-30 Plug and Abandoment Interventions Engineer: Aras Worthington (907) 440-7692 Pad Engineer: Steve Cinelli (907) 564-5919 History J-30 was planned as a grass roots well and spudded in July of 2014. The surface hole was drilled to 2698' MD. 9-5/8" casing was run and cemented to surface (729 bbls of 11-ppg litecrete + 49 bbls of 15.8-ppg Class G) with no issues. After the cement job the well began to flow water from the 20" conductor x 9-5/8" casing annulus @ -3bph. Flow of water diminished over several days to -1 bph but did not stop. The rig was eventually moved off the well and the cellar was monitored and sucked out for several weeks until the flow of water stopped. The decision has been made to abandon the surface casing hole permanently, however final excavation to 3' below Tundra will not be performed until final pad remediation therefore the well will remain in Suspended status until that time. Objective Cement abandonment of the surface casing from PBTD to surface. Procedural steps Coiled Tubing 1. RIH with a cementing nozzle 2. Lay 15.8-ppg Class G cement from PBTD to surface @ 1:1 Special Projects v ` fzi A-O(ZCC p h u fCID C 7n 1. Cut off all casings -1' below pad level. 2. Top off cement in 20" x 9-5/8" annulus and in 9-5/8" casing as needed / 3. Tack weld Marker plate onto 20" casing // h a h.C1 cry) vvl i vv+ l 421-C- i, h t�zIra lld�.,k ✓rua ova BP XplOr4+I �'�aS kaJ ��c . - 3 a Pr I /0-05d oiq - 23 �i5 - oa - oo 0 0 TREE= 4 1/16"OPY I-CF WELLJ-EAD= J-30 SAFETY NO TES: ACT1JA TOR= ' ii-nAL t.03.ELE asA. SUSPENDED BE ELEV= KOP= AV 4. Wax Angle= _.0._' -4 MEM TAM PORT COLLAR Datum kg) Datum TVD= 8800'SS *.HIC g 20"X 30"INSULATED CONDUCTOR, 80' al215.5S,A-53,D=19 250- Apie •11 ir E.'Sg „Hle 1 a 4e * e $ PBTD — 2608o ieE, 9-5/8-CSG,40#,L-80 BTC,ID=13.835" MEE= ' '' ' '"'" () TE RB/BY COUNTS DATE REV BY COM FRUCHOE BAY MIT 07/24/14 PKR 272 INT1AL(SUSPEMED) VVELL. J-30 07/29/14 PJC DRLG I-K)CORRECTIONS FERMI'b:'2140750 API MI 50-029-23515-00 . . ' SEC 9,711N,R13E,780"FN 8 1246FWL . BP Exploration(Alaska) 2 • • Loepp, Victoria T (DOA) From: Lastufka,Joseph N <Joseph.Lastufka@bp.com> Sent: Tuesday, May 12, 2015 1:29 PM To: Loepp, Victoria T(DOA) Cc: Sternicki, Oliver R Subject: FW:J-30 WFL Attachments: J-30_IBC_WFL_Ju12014.ppt Follow Up Flag: Follow up Flag Status: Flagged Victoria, Here is the electronic version,we will also include a hardcopy with the sundry for Suspend. Thanks! Joe From: Sternicki, Oliver R Sent: Tuesday, May 12, 2015 9:25 AM To: Lastufka, Joseph N Subject: RN: J-30 WFL Joe, Here is the slide pack that NWD put together on the surface casing issues we saw on J-30. Ryan and Mike said there were no issues with this going to the state. Let me know if you need anything else. Oliver Sternicki WO *Ant walk orIpmit*two Well Integrity Engineer BP Exploration Alaska Office: 1 (907) 564 4301 Cell: 1 (907) 350 0759 oliver.sternickibp.com From: Cedillo, Gerardo Sent: Monday, May 11, 2015 8:15 PM To: Rupert, C. Ryan Cc: Sternicki, Oliver R Subject: RE: 3-30 WFL Hi Ryan/Oliver The presentation is at: 1 • 0 S:\RES\TeamNWD\Public\Petrophysics\Well Logs\Prudhoe Bay\DP-J\J-30\J-30_IBC_WFL_Jul2014.ppt Or attached Rgds GC From: Rupert, C. Ryan Sent: Monday, May 11, 2015 2:17 PM To: Cedillo, Gerardo Subject: FW: 3-30 WFL Wasn't there a ppt slide floating around detailing this WFL that we ran? I can't seem to find it C. Ryan Rupert (686D) NWD Lead PE (Gravity Drainage) 907-564-4238 (0) 907-301-1736(C) Rvan.Rupert@bp.com From: McBride, Noelle Sent: Monday, July 21, 2014 7:36 AM To: Rupert, C. Ryan Subject: FW: 3-30 WFL From: Cedillo, Gerardo Sent: Saturday, July 19, 2014 1:37 AM To: Roach, Frank; Allen, Kenneth W; Von Tish, Douglas B; West, Taylor; McBride, Noelle; Crumley, Stephen G Cc: Townsend, S. Eliot Subject: J-30 WFL Hi Is my interpretation that the water influx is coming from 340-350 ft after several WFL stations Rgds 2 • • W Q CO J r NMI CE m y � • • CO Cn g 4 g ,-- -...- x 1 gi ki It 2%. L , , 1 ' .... 1 141 Eli i Q.7 M M R -1 • • N N N W w V w I 0CO �' r U N O N W N O N p N a NN^a O O 01 0 O O 9 0 Le O O O N b • OH I- . ,�-Fr'"--,f.,abr .,y. ryr-o3.k.+.. �A t Ji rr,;- u .7.77* k /'Y) 5_ O 1 f 1 , --•, 4� se war 4.1L1 . , � , 'Oft?''411 11'yC BPRF SV6 G1 rn :,......10,,,a.,, . ,. ' ' ,41/1414v1 . , v, . tl ii, „, iiiii. ' ,1o tnN v --I u' SI) If li '''' C) O' = m . O r-- "0 S1) C). -I O O CD 0 N r* N - n 0 r-'' O 'r1 3 C) N -$ O o m- w0 � o 3 v ca = N CD CD Q - rn ca CD *73 0 0 : p- ts , ‘-- r -- 0 i. i: i 1 t• f u, 81 r-.. li ,-; ,„• 8 ; 0 I ;-• t f.- . • t i ° I.. , f • ''11111 - it , a a #• .[, g ! !I - . ! 1 , - ! 1 i _ = 1 0 = C) 0 0 CD —h = —11 M 71 0 0 0 0 1 * * * 71 0 c... 0 -I OFE • • r- ("D . C") ,0,_cn,� — moms &AnF . r. � o — ,Time emm 33 n,, . � !#,'5715! 4; —.=-' l ° . . . . i . . , . \ . , . . ƒ , . , , / . , , . ? )} / I:#*g999® 0 #-�-m ;E ( CD am. )f{ ' j( °, . . . .., . ,. . .9, . . ,9,. . , .,..9. , , ,!. ., .7 }. & 42 PI, \ \ / , a___m�h( , . . .), . , . . , . ,f. . . .1, , , , , , . . , . , .1 \� \ �° Acoustic 7k 1,4 { ~ ° . . . .f . , . .T . . . .% . � .% . 2 .f . . .1' ± \ z , / \\ \ z-; f { U }}\) _ ( .- » k» f2 \ }®- § ` . &- . \ \ 13�( \ - \}} CA r Q )) " 7 %! § / § k 1F; \ } E/ F. ® /Si F:f% c— v€ 1110 • bp Date 16-JAN-2015 Transmittal Number: 93399 0,2/1/'075 BPXA WELL DATA TRANSMITTAL RECEIVED Enclosed are the materials listed below. JAN 1 6 2015 (BPXA LOG DATA) AOGCC If you have any questions, please contact Doug Dortch at the PDC at 564-4973 Delivery Contents 1 CD-ROM Containing Digital Log Data: 18-11B 18-11 B_BHI LTK Mem_FE Composite Drilling Data.las.dls J-30 BP J-30 CI_18Ju12014_IBC-MSIP SCH Repeat Pass_ConCu_RIL4Up.dlis Angela K. Singh Please Sign and Return one copy of this transmittal to; gancpdc@bp.com Doug Dortch Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Meredith Guhl 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage,AK 99519-6612 > 1 -o 0 0 TB' ((NJ�� �� COM o N - N '20 .a v (D z tM. N Q '� S ro r'D • N N m , � 3z -0 c ro M v W A A w L r v a o i 0 -0 .. W z v m m n Q n < V- 71? D N A O g 8 > r- m CD .i O in x CD V :4 1 ^ W v o v c00o p n ^� T LA vv �o 8 3 o o o 0 0 c:, m n 7 -+ o o o "" r+7 V ha N CA CO CO A N C.0 7 13 V ` oV c r m m r C m *� z z rn m m W v v W 2 p Y Ocoocoz �w 0o a m m O O Z m > `ff. #?. N = D m l fim cam -it � ' .40 e H c < 4 3 O r 0 0 0 r LA v CDD -r 1 2 , a) m 7C` 0t rN.rt ? < rn v70v -Ts :5ormFs ' C rro Ocu -4000 „,'' C' aCD mi r2 tz T T T T y '.fs rp (Q Nz , O ca -v —° to t2. ---__. z O ce < n o ro D C7 CD 0 O v « -+ 0 v .� co v Q (D -0 T T T T T T ++. O 0 ,- < CD 3 rrrrrr > cD Y < p v n P v T T m m T T -1 tp =; " A m m m m m m v �, o , v n r r r r r r p r., N r1 N v v v v v v "' vo, • n O (0 U N O O a) O 07, S J S n r- C a) - (D c IV — .... — N — D d S �. co -, CO A 00 m ,=, L. N -J n N rD n L L L L L L r -i < C O 3 ci c c C c c c O z N v C ? , . , , B C Ln r<o -0 a A A A A A A m tzi, '� .- l- N n = b r W in- • O_ , v 1 r C 'V ( D -a v m A O p Q °. O Os 2 .4 m 0 co, 70D rn O0 (I) m z-.O 0 < n A- v 21 0 rD +, N w A (� (D n y� ( (D � ` r0D O ...L I 1 STATE OF ALASKA ill ALSKA OIL AND GAS CONSERVATION COMMISSION RECEIVED REPORT OF SUNDRY WELL OPERATIONS AUG 19 2014 1. Operations Performed: IOGCC ❑Abandon 0 Repair Well 0 Plug Perforations 0 Perforate 0 Re-Enter Suspended Well V ❑Alter Casing 0 Pull Tubing 0 Stimulate-Frac El Waiver 0 Other ❑Change Approved Program ®Operation Shutdown 0 Stimulate-Other ❑Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. El Exploratory 214-075 p ry 0Stratigraphic 3. Address: ®Development El Service 6. API Numbe P.O. Box 196612,Anchorage,Alaska 99519-6612 50.029-23515-00-00 7. Property Designation(Lease Number): 8. Well Name and Number: ADL 028281 &028282 PBU J-30 9. Logs(list logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s): Prudhoe Bay/Prudhoe Bay 11. Present well condition summary: Total depth: measured 2698' feet Plugs:(measured) None feet true vertical 2698' feet Junk:(measured) None feet Effective depth: measured 2608' feet Packer: (measured) None feet true vertical 2608' feet Packer: (true vertical) None feet Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 80' 80' 1490 470 Surface 2694' 9-5/8" 2694' 2694' 5750 3090 Intermediate Production Liner Perforation Depth Measured Depth: None feet True Vertical Depth: None feet Tubing(size,grade,measured and true vertical depth): None None None None Packers and SSSV(type, measured and true vertical depth): None None None 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment description including volumes used and final pressure: 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 0 0 Subsequent to operation: 0 0 0 0 0 14.Attachments: 0 Copies of Logs and Surveys run 15.Well Class after work: 0 Exploratory 0 Stratigraphic ® Development ❑Service ® Daily Report of Well Operations 16. Well Status after work: El Oil El Gas El WDSPL ®Well Schematic Diagram El GSTOR El WINJ El WAG El GINJ ®SUSP El SPLUG 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact: Frank Roach,564-4373 314-437 Email: Frank.Roach@bp.com Printed Name: Joe Lastufknn Title: Drilling Technologist /1 Signature: J ,one: 564-4091 Date: 'WI v/I4— Form 10-404 Revised 10/2012 v L /D 3:)// ucms ginAl UOGnl o .te /i/y . • North America-ALASKA-BP Page 1 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 ; Spud Date/Time:7/11/2014 2:00:00AM t Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 7/8/2014 03:00 - 06:00 3.00 RIGD P PRE SECURE WELLAND CONTINUE TO RIG DOWN -PREPARE TO MOVE OFF WELL 06:00 - 12:00 6.00 RIGD P PRE DISCONNECT INTERCONNECT LINES !-SKID RIG FLOOR LAY DOWN DERRICK 12:00 - 17:00 5.00 RIGD P PRE MOVE AND STAGE MUD,UTILITY AND DRILL MODULES ON WEST SIDE OF DS 18 17:00 - 00:00 7.00 MOB P PRE MOVE UTILITY AND DRILL MODULE FROM DS 18 TOWARD J PAD -AT SKID 50(PUMP STATION 1)AT 24:00 PICK DUMMY WELLHOUSE AND SPOT ON J-30. 7/9/2014 00:00 - 06:30 6.50 MOB P PRE MOVE UTILITY AND DRILL MODULE FROM DS 18 TO J PAD -AT PRICE PAD AT 04:30 06:30 - 08:30 2.00 MOB P PRE I SPOT DRILL MOD OVER WELL HOUSE 1-MOBILIZE CREW TO DS 18 TO BEGIN MOVING MUD MOD 08:30 - 09:00 0.50 MOB P PRE ;ADJUST DUMMY WELL HOUSE AND SHIM DRILL MOD DROP SUPPORT COLUMN ON DRILL MOD 09:00 10:00 1.00 MOB P PRE SPOT UTILITY MOD NEXT TO DRILL MOD 1-BEGIN MOVING MUD MODULE FROM DS 18 j TOWARD J PAD � I PROVIDED AOGCC 24 HOUR NOTIFICATION FOR DIVERTER TEST. 10:00 - 10:30 0.50 MOB P PRE PULL CURTAINS AND PUT IN FLOOR SECTIONS AT INTERCONNECTS BETWEEN DRILL AND UTILITY MOD -CONTINUE MOVING MUD MOD 10:30 - 15:00 4.50 MOB P PRE CONNECT ELECTRICAL INTERCONNECT BETWEEN DRILLAND UTILITY MODS WORK ON RIGGING UP DIVERTER LINE -CONTINUE MOVING MUD MOD 13:00 HRS-PRE-SPUD MEETING WITH ANCHORAGE AND SLOPE PERSONNEL 15:00 - 19:00 4.00 MOB P I PRE RAISE DERRICK -MAX WEIGHT OBSERVED=520K -SECURE RIG FLOOR SLIDE HAUNCH INTO POSITION -SKID RIG FLOOR -BRIDLE DOWN 19:00 - 20:30 1.50 MOB P PRE I SPOT MUD MODULE ON J PAD AND SECURE DOORS 20:30 - 00:00 3.50 MOB P PRE RIG UP -SPOT CUTTINGS TANK -SET WALKWAYS 1-RIG UP RIG FLOOR I-HOOK UP MUD LINES -PREP PIPE SHED I-MAKE UP STAND TO TEST IDL Printed 8/6/2014 8:49:12AM North America-ALASKA-BP Page 2 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:OOAM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30©85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 7/10/2014 00:00 - 02:00 2.00 MOB P PRE CONTINUE TO RIG UP -RIG UP HIGH PRESSURE LINES TO RIG FLOOR. -CONTINUE TO MAKE UP CONNECTIONS IN INTERCONNECTS. -STRAP AND TALLY DRILL PIPE IN SHED. -CHECK GAS ALARMS THROUGHOUT RIG. STAGE HIGH PRESSURE RISER SECTIONS BEHIND RIG. ***ACCEPT RIG AT 00:00 *** 02:00 - 06:30 4.50 MOB P PRE CONTINUE TO RIG UP AND TAKE ON FLUIDS TO PITS. -INSTALL VALVES ON CONDUCTOR. -CONTINUE TO STRAP AND TALLY DRILL PIPE. -CONTINUE TO TORQUE UP BOLTS ON DIVERTER LINE. -TAKE ON 8.6 PPG MAXDRIL-N IN PITS. -CHANGE OUT SAVER SUB. -CALIBRATE TOTCO SENSORS AND SCREENS 06:30 - 11:00 4.50 MOB P PRE CONTINUE TO RIG UP PICK UP AND SET 21-1/4"ANNULAR ON HIGH PRESSURE RISER;TORQUE BOLTS -REASSEMBLE 5"ELEVATORS -TAKE ON 8.6 PPG MAXDRIL-N IN PITS AND MIX -BRING BAKER MWD TOOLS INTO PIPE SHED -TROUBLESHOOT IDL 11:00 - 12:00 1.00 MOB P PRE CONTINUE TO RIG UP -RIG UP TURN BUCKLES ON ANNULAR -INSTALL KOOMEY HOSES ON ANNULAR -PLACE FLOORING IN WELL HOUSE -MOBILIZE LOW PRESSURE RISER TO THE RIG FLOOR -TAKE ON 8.6 PPG MAXDRIL-N IN PITS AND MIX 12:00 - 16:00 4.00 MOB P PRE CONTINUE TO RIG UP -INSTALL RISER AND AIR BOOTS AND TURN BUCKLES -HOOK UP DRAIN LINES AND HOLE FILL LINES -INSTALL ANNULAR CONTROL LINES -PIN IDL OUT OF THE WAY -TAKE ON 8.6 PPG MAXDRIL-N IN PITS AND MIX 16:00 - 20:00 4.00 DRILL P SURF MOBILIZE BHA TOOLS TO PIPE SHED -MAKE UP STANDS AND RACK BACK IN DERRICK -LOAD PIPE SHED WITH 4"HWDP -MAKE UP STANDS 4"HWDP AND RACK BACK -DRAW DOWN TEST ON ANNULAR CONDUCT DIVERTER/KNIFE VALVE TEST -KNIFE VALVE OPEN IN 26 SECONDS -ANNULAR CLOSED IN 30 SECONDS -TEST WITNESS WAIVED BYAOGCC REP JOHN CRISP Printed 8/6/2014 8:49:12AM i • , North America-ALASKA-BP Page 3 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) I Start Date:7/8/2014 I End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay I Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30©85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT 1 NPT Depth Phase Description of Operations (hr) (usft) 20:00 - 22:30 2.50 DRILL P ; ' SURF RIG UP WIRELINE AND GYRO I-MOBILIZE TOOLS TO THE RIG FLOOR MOBILIZE BHA TO THE RIG FLOOR 22:30 - 23:00 0.50 DRILL P SURF CALIBRATE BLOCK HEIGHT I 23:00 - 00:00 1.00 DRILL P SURF PICK UP 12-1/4"BHA COMPONENTS 7/11/2014 100:00 - 01:30 I 1.50 RIGU P PRE PICK UP 12-1/4"SURFACE HOLE BHA PER BAKER DD 01:30 - 02:00 0.50 RIGU P ' PRE RIG EVACUATION DRILLANDAAR 02:00 - 06:00 4.00 DRILL P SURF SPUD WELL AT 02:00 AND DRILL AHEAD IN 12-1/4"SURFACE HOLE TO 328' -RACK STAND BACK AND PICK UP DRILL COLLARS I -TAG UP AT 3RD NON MAG COLLAR I -LAY DOWN COLLAR AND PICK UP STAND OF I ,HWDP I-CLEAN OUT FILLAND RACK BACK STAND OF HWDP I PICK UP NON MAG COLLAR AND RIH ,I-ORIENT UBHO SUB I-MAKE UP HWDP AND COLLARS I-DRILL AHEAD IN 12-1/4"SURFACE HOLE TO I 328' 1-420 GPM,560 PSI ON,500 PSI OFF I-60 RPM,1K TQ ON,1K TQ OFF I I-PU 51K,SO 51K,ROT 51K I-WOB 1-6K I -GYRO-90' I I I-CIRCULATE ON BOTTOM FOR 3-4 MINUTES PRIOR TO CONNECTIONS 06:00 - 06:30 0.50 DRILL P SURF I ATTEMPT TO GYRO AT 328' -UNABLE TO GET PASSED 180'WITH GYRO- TWO ATTEMPTS i -ROTATE STRING 1/2 TURN COUNTERCLOCKWISE AND SUCCESSFULLY MARRIED UP UBHO SUB WITH GYRO 06:30 - 08:30 2.00 DRILL N DPRB 328.00 I SURF MAKE CONNECTION AND ATTEMPT TO PICK UP WITH 20K OVERPULL -SET DOWN 20KAND ATTEMPT TO PUMP AT DRILLING RATE WITH NO SUCCESS;RACK i , BACK STAND -ATTEMPT TO ROTATE TRAPPED TORQUE IN STRING AT LIMIT OF 10K. -INCREASE TORQUE LIMIT TO ATTEMPT I TO ROTATE STRING UP TO 16K -ATTEMPT TO WORK STRING 1 i-LOST CIRCULATION=75% I-RELEASE TORQUE FROM STRING,WORK PIPE FREE ' -SLOWLY WORK STRING UP AT 45K ROT,30 RPM,TQ 11K -CIRCULATE CUTTINGS OUT. -LARGE INCREASE IN CUTTINGS OBSERVED AT SHAKERS AS WELL AS WATER + I CUT MUD RETURNS 08:30 - 09:00 0.50 DRILL N i DPRB 328.00 SURF ;PUMP OUT OF THE HOLE WITH LAST STAND i OF HWDP -30 RPM,51K ROT AT 1-4K TQ -60 SPM,180 PSI Printed 8/6/2014 8:49:12AM al • North America-ALASKA-BP Page 4 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 1X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 1 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date 1 From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) -I09:00 - 10:00 1.00 DRILL N DPRB 328.00 SURF I CIRCULATE AND RECIPROCATE PIPE I -60 SPM,180 PSI -DISCUSS PLAN FORWARD WITH TOWN 1 10:00 - 10:30 0.50 DRILL N DPRB ' 328.00 SURF CONTINUE TO WORK PIPE AND DISCUSS PLAN FORWARD WITH TOWN !1-RACK BACK LAST STAND OF HWDP I-MAKE UP 5 4"DRILL PIPE TO XO ON TOP OF COLLARS -PULL UP INTO CONDUCTOR 10:30 - 12:00 1.50 DRILL N DPRB 328.00 SURF MONITOR FLOW FROM WELL INTO PITS ; -WELL FLOWING AT 37 BBLS/HOUR -START TO WEIGHT UP MUD SYSTEM TO 9.1 PPG 12:00 - 13:30 1.50 DRILL N DPRB 328.00 SURF MONITOR FLOW FROM WELL INTO PITS -WELL FLOWING AT 37 BPH AT 12:00/ DECREASED TO 23.5 BPH AT 13:30 -WEIGHT UP MUD SYSTEM TO 9.1 PPG 13:30 - 14:30 1.00 DRILL N DPRB 328.00 SURF DISPLACE CONDUCTOR TO 9.1 PPG AND MONITOR WELL 14:30 - 18:00 I 3.50 DRILL N DPRB 328.00 SURF WEIGHT UP MUD TO 9.3 PPG -FLOW BACK 12 BPH AT 15:30 l -FLOWBACKAT9BPHAT16:30 18:00 - 19:00 I 1.00 DRILL N DPRB , 328.00 SURF DISPLACE CONDUCTOR TO 9.3 PPG AND I WASH DOWN TO 140' I-OBSERVE DECREASE IN VISCOSITY IN MUD; ! I PULL UP TO 127' -FLOW BACK STOPPED AT 19:00 HRS 19:00 - 21:00 2.00 DRILL N DPRB 328.00 SURF I CONDITION MUD AND BRING MUD UP TO 300 VISCOSITY I-MUD COMING BACK AT 8.8 PPG. !, I-CIRCULATED 2 SURFACE TO SURFACE I VOLUMES. -MUD WEIGHT BACK STILL 8.8 PPG -MONITOR WELL I -WELL FLOWING AT 2 BPH. -CIRCULATED SURFACE TO SURFACE WITH I 9.3 PPG MUD. 1 -MUD WEIGHT OUT=9.3 PPG. MONITOR WELL-STATIC. 21:00 - 00:00 3.00 DRILL ' N DPRB 328.00 SURF WASH TO 329'AT 230 PSI 7/12/2014 00:00 - 00:30 0.50 DRILL j N DPRB 328.00 SURF I WASH BACK TO BOTTOM. I-300 GPM,20 RPM. AUGER IN PITS SHUT DOWN AND BOUND UP 1 WITH GRAVEL. SHUT DOWN PUMPS AND PREPARED TO PULL BACK TO SHOE. 1 GRAVEL CONTINUED TO LOAD UP AND PACK OFF SHAKERS. 00:30 - 01:00 0.50 DRILL N SFAL 328.00 SURF PULL UP INTO THE CONDUCTOR WITH BHA. 1-PU 48K;SO 48K. Printed 8/6/2014 8:49:12AM • • North America-ALASKA-BP Page 5 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:OOAM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) _ Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:00 - 03:00 2.00 DRILL N SFAL 328.00 SURF CLEAN UP SHAKER ROOM. -RIG UP 4"HOSE FROM SUPER SUCKER TO SHAKER DECK. I � -CLEAN OUT GRAVEL FROM AUGER. -CLEAN OUT SHAKERS AND AROUND POSSUM BELLY. -AAR ON INCIDENT AND PJSM ON PLAN FORWARD. TRACTION REPORT FORTHCOMING. -NOTIFIED NS SUPERINTENDENT. 03:00 - 04:00 1.00 DRILL N SFAL 328.00 SURF WASH BACK TO BOTTOM. 1-100 GPM AND NO ROTATION. -30'OF FILL ON BOTTOM. 04:00 09:00 5.00 DRILL l P SURF !DRILL 12.25"SURFACE HOLE FROM 360'MD I TO 603'MD -400 GPM, 550 PSI ON,620 PSI OFF -60 RPM,1K TORQUE ON,1K TORQUE OFF -PU 56K,SO 56K,ROT 56K WOB 1-3K GYRO EVERY-90 FT -ACTUAL ROTATE TIME=4.8 HRS 1-MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT 1-WORK FULL STAND 2 TIMES AT 603',RACK 'ONE BACK AND GYRO AT 513' 09:00 - 09:30 ; 0.50 DRILL P SURF POOH ON ELEVATORS FROM 513'TO 497' PU 59K,SO 59KAT 513' I-ENCOUNTERED TIGHT HOLE AT 500'WITH 20K OVERPULL -MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT 09:30 - 10:00 0.50 DRILL P SURF PUMP OUT OF THE HOLE TO 452' -400 GPM,550 PSI -40 RPM,1K TQ,ROT 56K -OBSERVED FLOWAT BELL NIPPLE I � WASH BACK DOWN TO 603' -400 GPM,550 PSI 40 RPM,1K TQ,ROT 56K MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT 10:00 - 10:30 0.50 DRILL P SURF 1 WORK PIPE ON 30'STROKES 1 -300 GPM,335 PSI •-15 RPM,1K TQ,ROT 56K -WEIGHT UP MUD TO 9.6 PPG 10:30 - 11:30 1.00 DRILL P I I SURF PUMP 200 BBLS OF 9.6 PPG MUD AND WORK STAND IN 30',60'AND 90'INCREMENTS -400 GPM,550 PSI I-15 RPM,ROT 60K -9.5 PPG HEAVY OBSERVED IN PITS 1-FLOW CHECK WELL;SLIGHT FLOW OBSERVED 4.5-5 BPH. NO GAS OBSERVED 11:30 - 14:00 2.50 DRILL P I SURF PUMP OUT OF THE HOLE FROM 603' 300 GPM,335 PSI — — — PU 54K 14:00 - 15:00 1.00 DRILL P SURF MONITOR WELL FOR 15 MINUTES;STATIC -MAKE UP 12-1/4"BHA TO 187' INSPECT BIT;GOOD TO RERUN 15:00 - 15:30 0.50 DRILL P SURF SERVICE RIG FLOOR EQUIPMENT 15:30 - 16:30 1.00 DRILL P SURF CONTINUE TO MAKE UP 12-1/4"DRILLING BHA TO 540' -PU 54K,SO 54K AT 540' Printed 8/6/2014 8:49:12AM • • North America-ALASKA-BP Page 6 of 26 • Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date ! From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:30 - 17:30 1.00 DRILL P SURF WASH DOWN TO 603' -525 GPM,1100 PSI -PULL UP ONE STAND AND BREAK OFF DOUBLE TO GYRO 17:30 - 00:00 6.50 DRILL P SURF DRILL 12.25"SURFACE HOLE FROM 603'MD TO 980'MD(975'TVD) -525 GPM, 1320 PSI ON,1250 PSI OFF -45 RPM,2K TORQUE ON,1K TORQUE OFF -PU 70K,SO 70K,ROT 68K -WOB 8K -GYRO EVERY-94 FT -ACTUAL ROTATE TIME=.9 HRS -ACTUAL SLIDE TIME=2.3 HRS -JAR HOURS=8 HRS -MUD WEIGHT:9.6 PPG IN,9.6 PPG OUT 7/13/2014 00:00 - 06:00 6.00 DRILL P SURF DRILL 12.25"SURFACE HOLE FROM 980'MD TO 1311'MD 1-520 GPM, 1460 PSI ON,1380 PSI OFF 1-45 RPM,2K TORQUE ON,1K TORQUE OFF PU 74K,SO 70K,ROT 72K WOB 15K -GYRO EVERY-90 FT !-BACKREAM 10 FT PRIOR TO CONNECTIONS -MUD WEIGHT:9.7 PPG IN,9.7 PPG OUT 06 00 - 12:00 6.00 DRILL P SURF DRILL 12.25"SURFACE HOLE FROM 1311'MD TO 1705'MD(1697'TVD) -550 GPM, 1680 PSI ON,1530 PSI OFF 45 RPM,2K TORQUE ON,1K TORQUE OFF -PU 83K,SO 74K,ROT 72K WOB 13K -ECD:ACTUAL=10.27 PPG SURVEY EVERY-90 FT ACTUAL ROTATE TIME=1.3 HRS ACTUAL SLIDE TIME=5.3 HRS JAR HRS=14.3 -BACKREAM 15 FT PRIOR TO CONNECTIONS MUD WEIGHT:9.7 PPG IN,9.7 PPG OUT -DIFFICULTY BUILDING ANGLE DURING SLIDES,INTERMITTENT HARD SPOTS ENCOUNTERED FROM 1414'ON. 12:00 - 16:00 4.00 DRILL P SURF DRILL 12.25"SURFACE HOLE FROM 1705'MD j TO 2038'MD -550 GPM, 1860 PSI ON,1690 PSI OFF -60 RPM,3K TORQUE ON,2K TORQUE OFF -PU 89K,SO 79K,ROT 82K -WOB 18K -MUD WEIGHT:9.6 PPG IN,9.6 PPG OUT 16.00 - 17:00 1.00 DRILL P SURF CIRCULATE BOTTOMS UP -425 GPM,1100 PSI -70 RPM,1K TQ -PULL 1 STAND WHILE CIRCULATING BOTTOMS UP 17:00 - 20.00 3.00 DRILL P SURF PUMP OUT OF THE HOLE FROM 2026'TO 350' -MONITOR WELL FOR 10 MINUTES PRIOR TO POOH;STATIC I-MUD WEIGHT:9.6 PPG IN,9.6 PPG OUT -400 GPM,1000 PSI -50K OVERPULL OBSERVED AT 1020', ROTATE AT 45 RPM AND WIPE AREA. Printed 8/6/2014 8.49:12AM S S North America-ALASKA-BP Page 7 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 120:00 - 20:30 0.50 DRILL P SURF SERVICE TOP DRIVE -GREASE WASHPIPE. -RE-CALIBRATE ST-80. !20:30 - 22:00 1.50 DRILL ( P SURF RUN IN THE HOLE ON ELEVATORS WITH 12.25"DRILLING BHA FROM 350'TO 2026' -MUD WEIGHT:9.6 PPG IN,9.6 PPG OUT j 22:00 - 00:00 2.00 DRILL P SURF DRILL 12.25"SURFACE HOLE FROM 2026'MD TO 2180'MD -550 GPM, 1950 PSI ON,1875 PSI OFF -60 RPM,3K TORQUE ON,2K TORQUE OFF -PU 90K,SO 80K,ROT 82K -WOB 8-18K -SURVEY EVERY-90 FT -ACTUAL ROTATE TIME=2.5 HRS -ACTUAL SLIDE TIME=5 HRS -JAR HRS=18.9 -BACKREAM 15 FT PRIOR TO CONNECTIONS -MUD WEIGHT:9.6 PPG IN,9.6 PPG OUT 7/14/2014 00:00 02:00 2.00 DRILL P SURF DRILL 12.25'SURFACE HOLE FROM 2180'MD TO 2350'MD -550 GPM, 1920 PSI ON,1790 PSI OFF -60 RPM,3K TORQUE ON,2K TORQUE OFF -PU 96K,SO 81K,ROT 86K -WOB 14K SURVEY EVERY-90 FT -WIPE 15 FT PRIOR TO CONNECTIONS -MUD WEIGHT:9.7 PPG IN,9.7 PPG OUT -INTERMITTENT HARD SPOTS. 02:00 - 02:30 0.50 DRILL P SURF SERVICE RIG -RACK BACK ONE STAND AND WORK ONE FULL STAND. -100 GPM;600 PSI. -CHANGE OUT SWABS IN MUD PUMP#1. 02:30 - 07:00 4.50 DRILL P SURF DRILL 12.25"SURFACE HOLE FROM 2350'MD TO 2698'MD(2676'TVD) -550 GPM, 2100 PSI ON,1900 PSI OFF -70 RPM,4K TORQUE ON,3K TORQUE OFF PU 102K,SO 82K,ROT 87K WOB 18K -SURVEY EVERY-90 FT ACTUAL ROTATE TIME=2.9 HRS j-ACTUAL SLIDE TIME=1.4 HRS JAR HRS=23.2 -WIPE 15 FT PRIOR TO CONNECTIONS -MUD WEIGHT:9.7 PPG IN 9.7 PPG OUT 07.00 09:00 2.00 DRILL P SURF CIRCULATE HOLE CLEAN -650 GPM,2550 PSI -70 RPM,2-3K TQ -RECIPROCATE PIPE -PUMP WALNUT SHELL SWEEP 09'00 - 10:00 1.00 DRILL P SURF PUMP OUT OF THE HOLE FROM 2698'TO 1973' -MONITOR WELL FOR 10 MINUTES PRIOR TO PULLING OUT;STATIC -MUD WEIGHT:9.6 PPG IN,9.6 PPG OUT -PU 92K,SO 82K AT 1973' Printed 8/6/2014 8:49:12AM • • North America-ALASKA-BP Page 8 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 I End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT ! NPT Depth I Phase Description of Operations (hr) (usft) 10:00 - 11:30 1.50 DRILL P SURF I RIH ON ELEVATORS FROM 1973'TO 2698' I-MONITOR WELL FOR 10 MINUTES PRIOR TO RIH;STATIC -TIGHT SPOT ENCOUNTERED AT 2250',SET DOWN 15K. OVER PULL 20K UP ATTEMPT TO PUMP AND MOTOR STALLED.WORKED PIPE 3'WHILE BRINGING UP PUMPS AND ROTARY. BROKE FREE AND PULLED ABOVE AND ROTATED THROUGH. PULLED BACK THROUGH WITHOUT ROTARY WITH PUMPS ON. NO OVER PULL OBSERVED,RAN THROUGH WITHOUT PUMPS ON AND NO SLACK OFF OBSERVED. 11:30 - 12:30 1.00 DRILL P SURF CIRCULATE PRIOR TO POOH -650 GPM,2550 PSI -50 RPM,2K TO -RECIPROCATE PIPE _ 12:30 - 16:00 3.50 DRILL P SURF PUMP OUT OF THE HOLE FROM 2698'TO 650' -MONITOR WELL FOR 10 MINUTES PRIOR TO PULLING OUT;STATIC 300 GPM,800 PSI AT 2698' I- 2250'ENCOUNTERED 15K OVER PULL, WIPED ONCE AND WENT BACK THROUGH j'WITH NO OVER PULL -MUD WEIGHT:9.6 PPG IN,9.6 PPG OUT 50'/MINUTE PULLING SPEED 16:00 - 19:30 3.50 DRILL P SURF PUMP OUT OF THE HOLE FROM 650'TO SURFACE MONITOR WELL FOR 10 MINUTES PRIOR TO PULLING OUT;STATIC -300 GPM,350 PSI AT 650' MUD WEIGHT:9.6 PPG IN,9.6 PPG OUT I-LAY DOWN BHA TO PIPE SHED 19:30 - 20:00 0.50 DRILL P SURF 'CLEAN AND CLEAR RIG FLOOR 20:00 - 21:30 1.50 CASING P SURF RIG UP TO RUN 9-5/8"CASING -CHANGE OUT TOP DRIVE BAILS TO LONG BAILS -RIG UP VOLANT TOOL -RIG UP DOYON CASING MAKE UP SAFETY VALVE -INSTALL BAIL EXTENSIONS -INSTALL 9-5/8"SIDE DOOR ELEVATORS !-INSTALL PS 21'S AND CHANGE OUT INSERTS 21:30 - 00:00 2.50 CASING P SURF RUN 9-5/8",40#,L-80,BTC CASING TO 120' -CHECK FLOATS -BAKER LOCK SHOE TRACK -USE BEST 0 LIFE 200 NM PIPE DOPE -TORQUE CONNECTIONS TO 8500 FT-LBS RUN 1 FLOATING CENTRALIZER ON JOINTS 3-25 -BREAK CIRCULATION EVERY 420'AT 5 BPM -FILL CASING EVERY JOINT MUD WEIGHT:9.6 PPG IN,9.6 PPG OUT Printed 8/6/2014 8:49:12AM • i North America-ALASKA-BP Page 9 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3 014XQ C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) ; 7/15/2014 00:00 - 09:30 9.50 CASING P SURF RUN 9-5/8",40#,L-80,BTC CASING FROM 120' TO 2693' -USE BEST 0 LIFE 200 NM PIPE DOPE -TORQUE CONNECTIONS TO 8500 FT-LBS -RUN 1 FLOATING CENTRALIZER ON JOINTS 3-25 -BREAK CIRCULATION EVERY 400'AT 3 BPM FOR 5 MINUTES -FILL CASING EVERY JOINT 1-MUD WEIGHT:9.6 PPG IN,9.6 PPG OUT -FINAL PU 125K,SO 98K -ENCOUNTERED AND WORKED THROUGH TIGHT SPOTS AT:485',950',1115' -RUN IN AND MAKE UP HANGER AND LANDING JOINT. MAKE UP PUP TO TOP OF LANDING JOINT. 09:30 - 11:00 1.50 CEMT P SURF STAGE UP TO CEMENTING RATE IN 1 BPM INCREMENTS TO FINAL CIRCULATING RATE 1OF6BPM -3 BPM,258 PSI -4 BPM,265 PSI -5 BPM,270 PSI -6 BPM,280 PSI -CONDITION MUD TO 9.7 PPG,20 PV,16 YP -INITIAL PRESSURE AT CEMENTING RATE: 280 PSI -FINAL PRESSURE AT CEMENTING RATE AFTER HOLE CONDITIONED:230 PSI -CIRCULATE TOTAL OF 4.5 TIMES BOTTOMS-UP -RECIPROCATED PIPE WITH 10 FT OF STROKE. -CONDUCT PJSM ON CEMENT JOB TEST LINES OFFLINE Printed 8/6/2014 8:49:12AM �! i North America-ALASKA-BP Page 10 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:0O:OOAM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. WM: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 16:00 5.00 CEMT P SURF RIG UP AND CEMENT 9.625",40#/FT SURFACE CASING AS FOLLOWS. -FILL LINES WITH WATER AND PRESSURE TEST LINES -250/4500 FOR 5 MIN EACH. -MAKE UP CEMENT LINE TO CEMENT SWIVEL. -PUMP 100 BBLS OF 10 PPG MUD PUSH AT 5 BBLS/MINUTE -338 PSI INITIAL,250 PSI FINAL. -BACK OUT VOLANT TOOL,DROP BOTTOM PLUG AND MAKE UP VOLANT TOOL. -PUMP 729 BBLS OF 11 PPG LITECRETE LEAD CEMENT @ 5 BPM -EXCESS OF 500%THROUGH PERMAFROST.(YIELD 1.91 CU.FT/SK)-2143 SK. -333 PSI INITIAL,530 PSI FINAL -MAX PRESSURE 586 PSI WITH 645 BBLS AWAY. -LANDED BOTTOM PLUG WITH 204 BBLS AWAY. -INTERFACE WITH MUDPUSH NOTED IN RETURNS WITH 385 BBLS AWAY. -STOPPED RECIPROCATING WITH 450 BBLS AWAY. -PU INCREASED 68K OVER LANDED WT. -WORKED BACK TO BOTTOM AND PUT IT ON THE LANDING RING -INDICATIONS OF CEMENT IN RETURNS WITH 585 BBLS AWAY. -SHUT DOWN WITH 729 BBLS OF LEAD PUMPED AND BATCH UP TAIL. -AIR COMPRESSOR ON CEMENT TRUCK FAILED. -30 MIN TO FIX COMPRESSOR AND BATCH UP TAIL. -PUMP 49 BBLS OF 15.8 PPG CLASS G TAIL @ 3.5 BPM -EXCESS VOLUME 40%(YIELD 1.16 CU.FT/SK)-237 SX -376 PSI INITIAL,565 PSI FINAL. -BACK OUT VOLANT TOOL,DROP TOP PLUG AND MAKE UP VOLANT TOOL. -SLB KICK OUT TOP PLUG WITH 10 BBLS OF FRESH WATER. -PERFORM DISPLACEMENT WITH RIG PUMPS AND 9.6 PPG MUD -PUMP 100 BBLS AT 10 BPM;480 PSI ICP, 750 PSI FCP. -PUMP 80 BBLS AT 7 BPM;510 PSI ICP,875 PSI FCP. -PUMP 18 BBLS AT 2 BPM;615 PSI ICP,950 PSI FCP. -BUMP PLUG WITH 1994 STROKES(184.4 BBLS)AT 950 PSI. -INCREASE PRESSURE TO 1450 PSI AND HOLD FOR 5 MIN. -CHECK FLOATS—GOOD. -CEMENT IN PLACE(CIP)@ 15:20 7/15/2014. -TOTAL DISPLACEMENT VOLUME 184.4 BBLS Printed 8/6/2014 8:49:12AM i ! North America-ALASKA-BP Page 11 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 IX3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM ;Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations hr (usft) -+ -MEASURED BY STROKES @ 96%PUMP EFFICIENCY -NO PIPE RECIPROCATION DURING DISPLACEMENT -378 BBLS CEMENT RETURNED TO SURFACE -TOTAL CEMENT LOSSES DURING JOB=4 BBLS 16:00 - 16:30 0.50 CEMT P SURF UNSCREW FROM FLUTED HANGER -BREAK OUT PUP JOINT -REMOVE VOLANT TOOL '-LAY DOWN LANDING JOINT 16:30 - 18:30 2.00 CEMT P SURF RIG DOWN CEMENT/CASING TOOLS -REMOVE BALES EXTENSIONS AND ELEVATORS -CHANGE OUT BALES I-LAY DOWN VOLANT TOOL -PULL PS 21'S -LAY DOWN CASING TOOLS -BREAK DOWN SAFETY VALVE _ -CLEAN OUT FLOW BOX AND RIG FLOOR 18:30 - 22:00 3.50 WHSUR P SURF I UNSUCCESSFULLY ATTEMPT TO NIPPLE 1 DOWN ANNULAR AND RISERS 1-DRAIN RISERS CLEAN OUT CELLAR BOX PULL BELL NIPPLE. PREP TO DISMANTLE DIVERTER WHEN RISER AND ANNULAR FILLED UP WITH FLUID FROM WELL -REINSTALL BELL NIPPLE AND AIR UP BOOTS TO MONITOR WELL WITH FLOWPATH TO PITS 22:00 - 23:00 1.00 CEMT N CEMT SURF I RUN IN HOLE WITH STAND OF 4"DRILLPIPE AND STACK WASHER TOOL TO 100'MD. DISPLACE RISERS ABOVE WELLHEAD TO 9.9 PPG,360 SEC/QT FUNNEL VIS SPUD MUD. JET WASH STACK AND FLUSH TOP OF I HANGER. -MONITOR WELL AFTER DISPLACEMENT (WELL CHANNELING FLUID AT 2.7 BPH TO 3.5 BPH TO SURFACE) -COLLECT SAMPLES EVERY HOUR AND RECORD FLOWRATE VARIATIONS EVERY 1/2 HOUR. -OBSERVE 8.7 PPG,1000 MG/L CHLORIDE FLUID(-WATER) -DISCUSS PLAN FORWARD WITH TOWN ENGINEER,NORTH SLOPE SUPERINTENDENT AND WELLS TEAM LEAD 23:00 - 00:00 1.00 CEMT N CEMT I SURF MONITOR FLOW FROM WELL AND CONTINUE TO DISCUSS OPTIONS FOR PLAN FORWARD WITH TOWN ENGINEER,NORTH SLOPE SUPERINTENDENT AND WELL TEAM LEAD. FLOWRATE FROM WELL AVERAGING 2.7-3.5 BPH -COLLECT SAMPLES EVERY HOUR FOR ANALYSIS. -OBSERVE 8.7 PPG,1000 MG/L CHLORIDE FLUID(-WATER) SIMOPS: -BUILD STANDS OF 4"DP OFFLINE Printed 8/6/2014 8:49:12AM • North America-ALASKA-BP Page 12 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:OOAM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30©85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 7/16/2014 100:00 - 02:00 2.00 CEMT N CEMT SURF MONITOR THE WELL AND CONTINUE TO I DISCUSS OPTIONS FOR PLAN FORWARD WITH TOWN ENGINEER,NORTH SLOPE SUPERINTENDENT AND WELL TEAM LEAD. FLOW ESTIMATED AT 2.5 TO 3.5 BPH. -COLLECT SAMPLES EVERY HOUR FOR ANALYSIS. -FLUID APPEARS TO BE 8.7 PPG W/ CHLORIDES OF 1000 MG/L ' l -MAKE UP MULE SHOE AND RUN IN THE I HOLE ON 2 STANDS OF 4"DRILL PIPE to-200' MD. !-MAKE UP FOSV AND HEAD PIN,WITH 30 PSI IPRESSURE GAUGE. '-DISCONNECT HYDRAULIC CONTROL LINES TO KNIFE VALVE -SHUT IN ANNULAR PREVENTER AT 02:00 TO • BEGIN MONITORING WELL FOR PRESSURE BUILDUP. SIMOPS: -BUILD STANDS OF 4"DRILL PIPE OFFLINE. 02:00 - 14:30 12.50 CEMT N CEMT SURF •WITH WELL SHUT-IN ON ANNULAR PREVENTER,MONITOR PRESSURE ON WELL. • -NO INDICATIONS OF KNIFE VALVE LEAKING. • I-NO INDICATIONS OF BROACHING AROUND I NEARBY WELL HOUSES(DHD ONSITE TO ASSIST WITH MONITORING) -PRESSURE AT 06:00=1 PSI,07:30=3 PSI, 09:00=4 PSI,9:30-14:30=4.5 PSI STABILIZED) • SIMOPS: •-BUILD STANDS OF 4"DRILL PIPE OFFLINE. I-LOAD OUT SURFACE DIRECTIONAL TOOLS 'AND LOAD TOOLS FOR INTERMEDIATE HOLE •SECTION WORK ON PLAN FORWARD WITH I ANCHORAGE TEAM. BEGIN BUILDING ASSEMBLIES FOR CEMENT TOP JOB. I-GATHER AND ACCOUNT FOR TOOLS NEEDED FOR TOP JOB -WORK ON IDL -CLEAN PITS 14:30 - 17:00 2.50 CEMT N CEMT SURF OPEN UP PLUG VALVE ON TOP OF DRILL PIPE TO CHECK FOR PRESSURE AND MONITOR FLOW,NO FLOW UP THROUGH DRILL PIPE. -OPEN ANNULAR PREVENTER AND WELL RESUMED FLOWING. -FLOW RATE OF 4.3 BPH FROM 14:30-15:30. FLOW RATE OF 3.1 BPH FROM 16:00-17:00. SIMOPS: RIG UP CROSSOVERS TO 4"VALVES ON CONDUCTOR FOR INJECTIVITY TEST. Printed 8/6/2014 8:49:12AM • North America-ALASKA-BP Page 13 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) l Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:00 - 20:00 3.00 CEMT N CEMT SURF CONTINUE TO MONITOR WELL AND FLOW j RATES. -FLOW RATE OF 2.5 BPH FROM 17:00-18:00. -FLOW RATE OF 2.5 BPH FROM 18:00-19:00. FLOW RATE OF 2.0 BPH FROM 19:00-19:30. SIMOPS: RIG UP TO PERFORM INJECTIVITY TEST. -RUN IN THE HOLE WITH 4 STANDS OF PIPE WITH MULE SHOE RIG UP FOSV,PUMP IN SUB,TEE AND PLUG VALVES ON TOP I-MIX 9.8 PPG BRINE IN PILL PIT RIG UP LINES TO FILL TEST PUMP TANK WITH BRINE -RIG UP TEST CHART IN WELL HOUSE 20:00 - 22:00 2.00 CEMT N CEMT SURF PERFORM INJECTIVITY TEST ON 20" CONDUCTOR X 9.625"SURFACE CASING ANNULUS. -RIG UP SECONDARY KILL LINE FROM CHARGE PUMPS TO 4"VALVE ON 'CONDUCTOR CLOSE ANNULAR PREVENTER i-INJECT 1.3 BBLS AT 50 PSI OVER 13 MIN- (0.1 BPM). -BUBBLING OBSERVED IN J-25 WELL CELLAR -BLEED OFF PRESSURE 22:00 - 00:00 2.00 CEMT N CEMT SURF MONITOR WELLAND ESTABLISH FLOW RATES. -OPEN ANNULAR PREVENTER AND TAKE RETURNS TO TRIP TANK. -FLOW RATE OF 2.0 BPH FROM 22:30-23:30. FLOW RATE OF 1.5 BPH FROM 23:30-23:59. SIMOPS: -BUILD STANDS OF 4"DRILL PIPE OFFLINE. -HOUSEKEEPING THROUGHOUT THE RIG. 7/17/2014 00:00 - 09:00 9.00 CEMT N CEMT SURF CONTINUE TO MONITOR WELLAND ESTABLISH FLOW RATES. I-OPEN ANNULAR PREVENTER AND TAKE RETURNS TO TRIP TANK. -2.1 BPH FROM 00:01-01:00. -2.2 BPH FROM 01:00-02:00. -1.75 BPH FROM 02:00-03:00. -1.55 BPH FROM 03:00-04:00. -1.5 BPH FROM 04:00-05:00. -1.3 BPH FROM 05:00-06:00. -1.5 BPH FROM 06:00-07:00. -1.2 BPH FROM 07:00-08:00. -1.5 BPH FROM 08:00-09:00. SIMOPS: BUILD STANDS OF 4"DRILL PIPE OFFLINE. -HOUSEKEEPING THROUGHOUT THE RIG. -CLEAN PITS. Printed 8/6/2014 8:49:12AM • i North America-ALASKA-BP Page 14 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 I Spud Date/Time:7/11/2014 2:00:OOAM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30©85.40usft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 18:00 9.00 CEMT N CEMT SURF I RIG UP TO MONITOR WELL AND ESTABLISH FLOW RATES AT GROUND LEVEL. I23 PSI HYDROSTATIC DIFFERENCE BETWEEN I FLOW LINE AND 4"VALVES ON CONDUCTOR. -RIG DOWN FOSV AND HEAD PIN FROM TOP OF 4"DRILL PIPE. -PULL AND STAND BACK THE 4 STANDS OF 4" DRILL PIPE. -LAY DOWN THE MULE SHOE. -STAGE SUPER SUCKERS AND RIG UP TO SUCK OUT STACK AND CLEAN OUT CELLAR. -UNCLOG 4"CONDUCTOR VALVES AND DRAIN STACK INTO CELLAR. -UTILIZE SUPER SUCKERS TO CLEAN OUT CELLAR. -ESTABLISH FLOW RATES FROM 4" CONDUCTOR VALVES AND CONTINUE TO COLLECT SAMPLES. -7.4 BPH FROM 10:00-11:00. -6.7 BPH FROM 11:00-12:00. -6.4 BPH FROM 12:00-13:00. -6.1 BPH FROM 13:00-14:00. -5.8 BPH FROM 14:00-15:00. -5.7 BPH FROM 15:00-16:00. -5.5 BPH FROM 16:00-17:00. -5.5 BPH FROM 17:00-18:00. SIMOPS: j-HOUSEKEEPING THROUGHOUT THE RIG. I-PERFORM PREVENTATIVE MAINTENANCE ON PS-21 SLIPS AND RIG FLOOR EQUIPMENT. ELECTRICIAN CONTINUES TO TROUBLESHOOT IDL OFF-LINE WHEN POSSIBLE. 18:00 - 19:30 1.50 CEMT N CEMT SURF RIG UP TO RUN IN THE HOLE WITH 4"DRILL I PIPE TO DISPLACE 9-5/8"SURFACE CASING TO 9.9 PPG BRINE. -PULL BUSHINGS AND INSTALL PS-21 SLIPS. -MAKE UP 2 PIECE 9-5/8"LANDING JOINT. -RUN IN THE HOLE WITH 9-5/8"LANDING JOINT AND MAKE UP TO CASING HANGER. -CLOSE 21"ANNULAR PREVENTER ON LANDING JOINT. BACK OUT AND LAY DOWN UPPER PUP OF 2 PIECE LANDING JOINT. -REMOVE PS-21 SLIPS AND INSTALL BUSHINGS. CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES. -5.1 BPH FROM 18:00-19:00. Printed 8/6/2014 8:49:12AM North America-ALASKA-BP Page 15 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM I Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) • Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) 19:30 - 22:00 2.50 CEMT N CEMT SURF RUN IN THE HOLE WITH 8-1/2"MILL TOOTH BIT ON 4"DRILL PIPE STANDS FROM DERRICK TO 2606'MD. MAKE UP USED 8-1/2"MILL TOOTH BIT,BIT I SUB AND XO TO STAND OF 4"DRILL PIPE. -PU=70K LBS;SO=62K LBS AT 2600'MD. TAG UP AT 2606'MD WITH 10K LBS. CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES. -4.5 BPH FROM 19:00-20:00. 4.5 BPH FROM 20:00-21:00. -4.2 BPH FROM 21:00-22:00. SIMOPS: OFF LOAD 9.8 PPG BRINE TO ACTIVE PITS. BUILD 40 BBL HIGH-VIS SPACER PILL. GENERAL HOUSEKEEPING. 22:00 00:00 2.00 CEMT N CEMT SURF !PREPARE TO DISPLACE 9-5/8"SURFACE CASING. CONTINUE TO OFF LOAD 9.8 PPG BRINE TO ACTIVE PITS. MOVE 9.8 BRINE FROM RESERVE PITS TO 'ACTIVE PITS. CONTINUE TO BUILD 40 BBL HIGH-VIS SPACER PILL. CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES. -3.7 BPH FROM 22:00-23:00. -3.8 BPH FROM 23:00-23:59. 7/18/2014 00:00 - 01:30 1.50 CEMT N CEMT SURF DISPLACE 9-5/8"CASING FROM 9.7 PPG SPUD MUD TO 9.8 PPG BRINE. -420 GPM;623 PSI. ROTATING 20 RPM;RECIPROCATING PIPE 45'. -40 BBL SHI H-VI SPACER. G 9.8 PPG BRINE IN AND OUT. CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES. -3.7 BPH FROM 00:00-01:00. 01:30 - 02:30 1.00 CEMT N CEMT SURF I PULL OUT OF THE HOLE ON ELEVATORS FROM 2606'AND LAY DOWN 8-1/2"BIT. MONITOR WELL FOR 5 MIN:STATIC. MUD WEIGHT:9.8 PPG IN,9.8 PPG OUT. -FILL PIPE EVERY 10 STANDS WITH MUD PUMP. I-LAY DOWN BIT AND BIT SUB. CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES. -3.5 BPH FROM 01:00-02:00. Printed 8/6/2014 8:49:12AM 110 I North America-ALASKA-BP Page 16 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations _ (hr) (usft) 02:30 - 03:00 0.50 CEMT N CEMT SURF RIG UP FOR E-LINE AND LOGGING RUNS. -MAKE UP 9-5/8"PUP JOINT FOR 2 PIECE LANDING JOINT. -FILL LANDING JOINT WITH 9.8 PPG BRINE. -INSTALL WIRE LINE BEAM NEAR TOOL [CRANE DOOR. -CLEAN AND CLEAR RIG FLOOR FOR WIRE LINE OPERATIONS. CONTINUE TO MONITOR FLOW FROM WELL 1 THROUGH 4"CONDUCTOR VALVES. -3.5 BPH FROM 02:00-03:00. 03:00 - 05:00 2.00 CEMT N CEMT SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES WHILE 'WAITING ON SCHLUMBERGER E-LINE. -3.3 BPH FROM 03:00-04:00. -3.2 BPH FROM 04:00-05:00. SIMOPS: OFFLOAD MUD FROM PITS. -GENERAL HOUSEKEEPING AROUND RIG. I-PERFORM PREVENTATIVE MAINTENANCE AND INSPECTIONS ON PRT CRANES IN PIPE SHED. 05:00 - 08:00 3.00 EVAL N CEMT SURF SPOT AND RIG UP SCHLUMBERGER E-LINE. SPOT SCHLUMBERGER E-LINE UNIT. RIG UP E-LINE SHEAVES ON RIG FLOOR. -NO PRESSURE CONTROL,ONLY AIR LINE WIPER. CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES. -3.2 BPH FROM 05:00-06:00. -3.0 BPH FROM 06:00-07:00 -3.0 BPH FROM 07:00-08:00 Printed 8/6/2014 8.49:12AM i I North America-ALASKA-BP Page 17 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 1X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (usft) 1 08:00 - 00:00 16.00 EVAL N CEMT + SURF RUN IN HOLE WITH SLB ISOLATION SCANNER TO 2600'MD(9-5/8"FLOAT COLLAR AT 2608' MD). LOG FROM 2600'TO SURFACE AND MAKE REPEAT PASS FROM 550'MD TO SURFACE TO EVALUATE CEMENT BEHIND 9-5/8"CASING. i I CHANGEOUT TOOLS AND RUN IN HOLE WITH RST/TEMPERATURE LOGGING TOOLS TO 2600'MD. RUN TEMPERATURE LOG FROM 2600'MD TO SURFACE. HOLD PJSM WITH RIG CREW TO REVIEW HAZARD ANALYSIS FOR RST TOOL. PERFORM RST STATION I ANALYSIS AT FOLLOWING DEPTHS,VARYING TOOL SETTINGS AS NEEDED: 260'MD(X3); 350'MD; 450'MD(X3); 550' MD; 300'MD; 750'MD; 2100'MD(X3); 2585'MD(X2); � I 2200'MD(X2); SEE AWGRS REPORT FOR DETAILED TIME SUMMARY OF SCHLUMBERGER LOGGING. CONTINUE TO MONITOR FLOW FROM WELL 'THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, -1200 MG/L CHLORIDES;45°F. -2.8 BPH FROM 08:00-09:00 -2.7 BPH FROM 09:00-10:00 -2.7 BPH FROM 10:00-11:00 -2.6 BPH FROM 11:00-12:00 -2.6 BPH FROM 12:00-13:00 -2.6 BPH FROM 13:00-14:00 -2.6 BPH FROM 14:00-15:00 -2.4 BPH FROM 15:00-16:00 -2.4 BPH FROM 16:00-17:00 -2.4 BPH FROM 17:00-18:00 -2.4 BPH FROM 18:00-19:00 -2.3 BPH FROM 19:00-20:00 -2.3 BPH FROM 20:00-21:00 -2.2 BPH FROM 21:00-22:00 -2.2 BPH FROM 22:00-23:00 -2.0 BPH FROM 23:00-23:59 SIMOPS: GENERAL HOUSEKEEPING THROUGH-OUT RIG. -WORK ON WEEKLY PREVENTATIVE MAINTENANCE ITEMS Printed 8/6/2014 8:49:12AM • North America-ALASKA-BP Page 18 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 IX3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30©85.40usft(above Mean Sea Level) Date From-To I Hrs I Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 7/19/2014 00:00 - 04:00 4.00 EVAL N CEMT SURF CONTINUE TO PERFORM RST STATION ANALYSIS AT FOLLOWING DEPTHS: 2300'MD; 2500'MD; 340'MD(X3); 330' MD; 320'MD; 310'MD; 360'MD; 500'MD; 650'MD SEE AWGRS REPORT FOR DETAILED TIME SUMMARY OF SCHLUMBERGER LOGGING. I CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, I-1200 MG/L CHLORIDES,45°F,11 pH -2.0 BPH FROM 00:00-01:00 -2.0 BPH FROM 01:00-02:00 I ' I -1.9 BPH FROM 02:00-03:00 -1.9 BPH FROM 03:00-04:00 -1.8 BPH FROM 04:00-05:00 04:00 - 05:00 1.00 EVAL N CEMT SURF RIG DOWN SCHLUMBERGER E-LINE AND LAY DOWN LOGGING TOOLS. HOLD PJSM WITH RIG CREW TO REVIEW HAZARD ANALYSIS FOR RST TOOL AND FOR RIGGING DOWN E-LINE. LAY DOWN RST TOOL TO PIPE SHED. -RIG DOWN E-LINE SHEAVES AND CLEAN AND CLEAR RIG FLOOR. -1.8 BPH WATER FLOW FROM 05:00-06:00 Printed 8/6/2014 8:49:12AM • • North America-ALASKA-BP Page 19 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code I NPT NPT Depth Phase Description of Operations (hr) (usft) 05:00 - 13:00 -I 8.00 CEMT N CEMT SURF UNSUCCESSFULLY ATTEMPT TO RUN IN HOLE THROUGH 9-5/8"HANGER FLUTES WITH 1"CS HYDRIL PIPE FOR TOP JOB. -OPEN THE 21"ANNULAR PREVENTER DRAIN STACK THROUGH CONDUCTOR OUTLETS. -ATTEMPT TO WORK 1"PIPE DOWN FROM RIG FLOOR THROUGH FLUTES. ABLE TO RUN IN THROUGH 1 FLUTE TO NO-GO DEPTH OF 5'PAST HANGER(52'FROM RIG FLOOR). -PULL LANDING JOINT,RUN IN HOLE WITH STACK WASHER AND JET CLEAN FLUTED HANGER AREA. POOH WITH STACK WASHER TOOL AND DRAIN STACK. RE-INSTALL LANDING JOINT. -RE-ATTEMPT TO WORK 1"PIPE DOWN FROM RIG FLOOR THROUGH FLUTES. ABLE TO RUN IN THROUGH 1 FLUTE TO NO-GO DEPTH OF 5'PAST HANGER(52'FROM RIG FLOOR). BOTH CREWS HAVE REPEAT RESULTS. -DISCUSS RESULTS WITH ANCHORAGE TEAM. PLAN TO CONTINUE MONITORING WELL WHILE PERFORMING PROJECTS AROUND RIG. INSTALL OPEN FOSV IN TOP OF LANDING JOINT. CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, 1-1200 MG/L CHLORIDES,45°F,11 pH -1.8 BPH FROM 05:00-06:00 -1.8 BPH FROM 06:00-07:00 -1.8 BPH FROM 07:00-08:00 -1.8 BPH FROM 08:00-09:00 -1.6 BPH FROM 09:00-10:00 -1.6 BPH FROM 10:00-11:00 -1.4 BPH FROM 11:00-12:00 -1.1 BPH FROM 12:00-13:00 Printed 8/6/2014 8:49:12AM S ! North America-ALASKA-BP Page 20 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) ' Start Date:7/8/2014 End Date:7/24/2014 'X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 t 85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) _ 13:00 - 00:00 11.00 CEMT N CEMT SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, -1200 MG/L CHLORIDES,45°F,11 pH -OPEN FOSV INSTALLED IN TOP OF LANDING JOINT. -1.1 BPH FROM 13:00-14:00 -1.0 BPH FROM 14:00-15:00 -1.1 BPH FROM 15:00-16:00 -1.0 BPH FROM 16:00-17:00 -1.0 BPH FROM 17:00-18:00 -1.0 BPH FROM 18:00-19:00 -1.0 BPH FROM 19:00-20:00 -1.0 BPH FROM 20:00-21:00 -1.0 BPH FROM 21:00-22:00 -1.0 BPH FROM 22:00-23:00 -1.0 BPH FROM 23:00-23:59 SIMOPS: -GENERAL HOUSEKEEPING THROUGH OUT RIG. -WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. -RIG DOWN AND REMOVE STABBING BOARD FROM DERRICK. -OPEN BOP DOORS AND CLEAN FOR INSPECTION. -REMOVE GUARDS AND DRAIN OIL ON JMUD PUMP 2 FOR INSPECTION. 7/20/2014 00:00 - 06:00 6.00 CEMT N CEMT SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, -1200 MG/L CHLORIDES,45°F,11 pH -1.0 BPH FROM 00:00-01:00 -1.0 BPH FROM 01:00-02:00 -1.0 BPH FROM 02:00-03:00 -0.9 BPH FROM 03:00-04:00 -0.9 BPH FROM 04:00-05:00 -0.9 BPH FROM 05:00-06:00 SIMOPS: GENERAL HOUSEKEEPING THROUGH OUT RIG. 1-WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. -REMOVE GUARDS AND DRAIN OIL ON MUD PUMP 1 FOR INSPECTION. -CLEAN AND INSPECT PIPE CAT. -CLEAN AND PREP OVERHEAD TROLLEY CRANES FOR INSPECTION. -CLEAN AND INSPECT ROTARY TABLE. 1-WORK ON AUGER IN SHAKER DECK Printed 8/6/2014 8:49:12AM • • • North America-ALASKA-BP Page 21 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30©85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 12:00 6.00 CEMT N CEMT SURF i CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, -1200 MG/L CHLORIDES,45°F,11 pH -0.9 BPH FROM 06:00-12:00 SIMOPS: -GENERAL HOUSEKEEPING THROUGH OUT RIG. -WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. -CLEAN AND PREP OVERHEAD TROLLEY CRANES FOR INSPECTION. INSPECT MUD PUMP 1. -CLEAN AND PAINT EXPOSED METAL IN I DERRICK. ELECTRICIANS TROUBLESHOOT IRON DERRICK MAN. FABRICATE NEW HYDRAULIC HOSE FOR FORUM CRANE. 12:00 - 18:00 6.00 CEMT N CEMT SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, i-1500 MG/L CHLORIDES,45°F,11 pH -0.9 BPH FROM 12:00-18:00 SIMOPS: GENERAL HOUSEKEEPING THROUGH OUT • RIG. WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. CONTINUE TO INSPECT MUD PUMP 1. CLEAN AND PAINT EXPOSED METAL IN DERRICK. ELECTRICIANS TROUBLESHOOT IRON DERRICK MAN. WELD STAIRS ON CATWALK. I-CLEAN OUT DRIP PAN UNDER PIPE RACKS 18:00 00:00 6.00 CEMT N CEMT CO RIG FLOOR. - t SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, -1500 MG/L CHLORIDES,45°F,11 pH -0.9 BPH FROM 18:00-23:59 SIMOPS: -GENERAL HOUSEKEEPING THROUGH OUT RIG. WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. -RIG DOWN POWERSHOE FOR IRON DERRICKMAN AND REPLACE CABLES. -BREAK DOWN HANDLING EQUIPMENT ON • RIG FLOOR AND PREP FOR INSPECTION. Printed 8/6/2014 8:49:12AM • North America-ALASKA-BP Page 22 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 1X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay I Site:PB J Pad �1 Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs I Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 7/21/2014 !00:00 - 06:00 6.00SURF CONTINUE TO MONITOR FLOW FROM WELL CEMT N CEMT i THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, -1500 MG/L CHLORIDES,45°F,11 pH -0.9 BPH FROM 00:00-06:00 SIMOPS: ',-GENERAL HOUSEKEEPING THROUGH OUT RIG. I-WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. I-BREAK DOWN HANDLING EQUIPMENT ON RIG FLOOR AND PREP FOR INSPECTION. -PREP TRAVELING BEAMS FOR INSPECTION -CLEAN AND PAINT EXPOSED METAL IN DERRICK. 06:00 - 12:00 6.00 CEMT N CEMT SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, -1500 MG/L CHLORIDES,40°F,11 pH -0.9 BPH FROM 06:00-12:00 III 1 I SIMOPS: GENERAL HOUSEKEEPING THROUGH OUT RIG. -WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. -BREAK DOWN HANDLING EQUIPMENT ON RIG FLOOR AND PREP FOR INSPECTION. -PREP TRAVELING BEAMS FOR INSPECTION -CLEAN AND PAINT EXPOSED METAL IN DERRICK 18:00 6.00 CEMT N CEMT -ELECTRICIANSPAIRIRON TROUBLESHOOT AND REPAIR IRON DERRICK MAN. 12:00 SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, -1500 MG/L CHLORIDES,40°F,11 pH -0.9 BPH FROM 12:00-15:00 0.8 BPH FROM 15:00-18:00 SIMOPS: -GENERAL HOUSEKEEPING THROUGH OUT .RIG. WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. -BREAK DOWN HANDLING EQUIPMENT ON RIG FLOOR AND PREP FOR INSPECTION. I-INSPECT AND RE-INSTALL RAMS IN BOP STACK. -INSPECT MUD PUMP. -RIG DOWN SECONDARY KILL LINE TO WELLHOUSE. ELECTRICIANS TROUBLESHOOT AND REPAIR IRON DERRICK MAN. Printed 8/6/2014 8:49:12AM • • North America-ALASKA-BP Page 23 of 26 Operation Summary Report Common Well Name.J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 ,X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date 1 From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 00:00 6.00 CEMT N CEMT SURF CONTINUE TO MONITOR FLOW FROM WELL 1 THROUGH 4"CONDUCTOR VALVES: FLUID 1 I REMAINS CLEAR FRESH WATER,8.4 PPG, -1500 MG/L CHLORIDES,38°F,11 pH -0.8 BPH FROM 18:00-23:59 SIMOPS: 1 i-GENERAL HOUSEKEEPING THROUGH OUT !RIG. -WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. -PREPARE HANDLING EQUIPMENT ON RIG I FLOOR FOR INSPECTION. FUNCTION TEST AND VERIFY HYDRAULIC PRESSURES ON PIPE CAT. r. 7/22/2014 00:00 - 06:00 6.00 CEMT N CEMT SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID 1 REMAINS CLEAR FRESH WATER,8.4 PPG, -1500 MG/L CHLORIDES,38°F,11 pH -0.8 BPH FROM 00:00-06:00 SIMOPS: 1-GENERAL HOUSEKEEPING THROUGH OUT RIG. -WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. WORK ON MUD PUMPS AND PREP FOR INSPECTION. PREPARE HANDLING EQUIPMENT ON RIG FLOOR FOR INSPECTION. 06:00 - 00:00 18.00 l CEMT N CEMT SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, ' -1500 MG/L CHLORIDES,34°F,11 pH -0.73 BPH FROM 06:00-00:00 �SIMOPS: 1-GENERAL HOUSEKEEPING THROUGH OUT I RIG. WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. 1-WORK ON MUD PUMPS AND PREP FOR I I INSPECTION. , I-PREPARE HANDLING EQUIPMENT ON RIG FLOOR FOR INSPECTION. I-TROUBLESHOOT IDL '-MAKE UP DRY HOLE TREE TO TUBING SPOOLADAPTER AND TUBING SPOOL Printed 8/6/2014 8:49:12AM • North America-ALASKA-BP Page 24 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30©85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 7/23/2014 00:00 - 06:00 6.00 CEMT N CEMT SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, -1500 MG/L CHLORIDES,34°F,11 pH -0.75 BPH FROM 00:00-06:00 SIMOPS: -GENERAL HOUSEKEEPING THROUGH OUT RIG. -WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. -WORK ON MUD PUMPS AND PREP FOR INSPECTION. -PREPARE HANDLING EQUIPMENT ON RIG FLOOR FOR INSPECTION. 06:00 - 00:00 18.00 CEMT N CEMT SURF CONTINUE TO MONITOR FLOW FROM WELL THROUGH 4"CONDUCTOR VALVES: FLUID REMAINS CLEAR FRESH WATER,8.4 PPG, -1700 MG/L CHLORIDES,33°F,10.6 pH -0.71 BPH FROM 06:00-00:00 SIMOPS: -GENERAL HOUSEKEEPING THROUGH OUT RIG. -WORK ON OFF CRITICAL PATH SUMMER MAINTENANCE PROJECTS. -WORK ON MUD PUMPS AND PREP FOR INSPECTION. -PREPARE HANDLING EQUIPMENT ON RIG FLOOR FOR INSPECTION. -L/D 89 STANDS OF 4"DP OUT OF DERRICK 7/24/2014 00:00 - 06:00 6.00 N CEMT SURF CONTINUE TO MONITOR 9-5/8"CSG X 20" CONDUCTOR ANNULUS;GENERAL HOUSEKEEPING AND PREVENTATIVE MAINTENANCE WORK. -0.7 BPH,33°F,FROM 00:00-0600 -06:00-PH=11.3,CHLORIDES=1600 MG/LAT 6AM SIMOPS: -GENERAL HOUSEKEEPING THROUGH OUT RIG -GATHER REMANING HARDLINES OFF THE RIG -RIG DOWN RIG TONGS AND DISSAMBLE AND CLEAN FOR INSPECTION -DISCONNECT STEAM LINES AND OTHER LINES THROUGHOUT THE RIG -PERFORM DERRICK INSPECTION PREPARE HANDLING EQUIPMENT ON RIG FLOOR FOR INSPECTION. Printed 8/6/2014 8:49:12AM • North America-ALASKA-BP Page 25 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 End Date:7/24/2014 1X3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30 @85.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) _ 06:00 - 10:30 4.50 CEMT N CEMT SURF CONTINUE TO MONITOR 9-5/8"CSG X 20" CONDUCTOR ANNULUS;GENERAL HOUSEKEEPING AND PREVENTATIVE MAINTENANCE WORK. -0.67 BPH,33°F,FROM 06:00-10:30 SIMOPS: GENERAL HOUSEKEEPING THROUGH OUT RIG -PREPARE HANDLING EQUIPMENT ON RIG i FLOOR FOR INSPECTION INSPECT AND CLEAN SCREENS ON MUD PUMPS -L/D 4 STANDS OF HWDP 10:30 - 12:00 1.50 RIGD N CEMT SURF CONTINUE TO MONITOR 9-5/8"CSG X 20" CONDUCTOR ANNULUS;GENERAL HOUSEKEEPING AND PREVENTATIVE MAINTENANCE WORK. -0.67 BPH,33°F SIMOPS: -PULL LANDING JOINT AND BELL NIPPLE PREPARE TO NIPPLE DOWN DIVERTER SYSTEM 12:00 - 18:00 6.00 RIGD NCEMT SURF RECIEVE LEVEL 2 OCN FROM ODE TO NIPPLE :DOWN DIVERTER SYSTEM,NIPPLE UP A DRY HOLE TREE AND RIG DOWN/MOVE OFF, APPROVED BY DRILLING ENGINEERING 11MANAGER,WELLS OPERATIONS MANAGER, AND AOGCC OCN INCLUDES JOINT AGREEMENT I BETWEEN RIG AND WELLS GROUP REGARDING CUSTODY TRANSFER AND MONITORING PLAN POST RIG -BLOW DOWN KELLY HOSE,2ND KILL LINE, AND RIG DOWN FLOW LINE,FILL LINE AND DRAIN LINE DE-ENGERGIZE KOOMEY RIG DOWN DIVERTER(BAG) RIG DOWN HIGH PRESSURE RISERS -RIG DOWN DIVERTER OUTLET LINE I-CLEAN AND DRAIN PITS -DRAIN AND RIG DOWN CUTTINGS BOX I-DISCONNECT LINES BETWEEN INTERCONNECTS SIMOPS: -CONTINUE TO MONITOR 9-5/8"CSG X 20" CONDUCTOR ANNULUS;GENERAL HOUSEKEEPING AND PREVENTATIVE iMAINTENANCE WORK. -0.67 BPH,33°F Printed 8/6/2014 8:49:12AM • • • North America-ALASKA-BP Page 26 of 26 Operation Summary Report Common Well Name:J-30 AFE No Event Type:DRL-ONSHORE(DON) Start Date:7/8/2014 I End Date:7/24/2014 rX3-014XQ-C:(8,336,034.00) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:PARKER 272 Spud Date/Time:7/11/2014 2:00:00AM Rig Release:7/24/2014 Rig Contractor:PARKER DRILLING CO. UWI: Active datum:J-30(4185.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 00:00 6.00 RIGD N CEMT SURF NIPPLE UP FMC 21-1/4"X 11"SPOOL, ADAPTER FLANGE AND DRY HOLE TREE(SEE ATTACHED DRAWINGS/PICTURES) -LEAVE ALL TREE AND WELLHEAD VALVES OPEN WITH PRESSURE GAUGES. DUE TO NO PRESSURE ISOLATION BETWEEN 9 5/8"CASING AND CONDUCTOR ANNULUS AND CONCERNS ABOUT POTENTIAL BROACHING BELOW THE CONDUCTOR SHOE AT 127'MD,TREE NOT PRESSURE TESTED PER OCN I-FINAL WELL FLOW RATE=.6 BPH AT 33°F SIMOPS: I,-CLEAN AND SECURE BOP DECK CONTINUE RIGGING DOWN LINES BETWEEN DRILLERS MODULE AND MUD 'MODULE INTERCONNECTS MOVE CUTTINGS BOX RIG DOWN ALL MUD LINES,WATER LINES AND STEAM LINES I-DRESS OUT RIG FLOOR,SPLIT BLOCKS -CHECK AIR TIRE PRESSURE:GOOD NOTE: I -RIG RELEASED AT 23:59 HRS -J-30 DRILLING OPERATIONS SUSPENDED (APPROVED BYAOGCC) I-RIG TO MOVE OFF AND COMPLETE ANNUAL MAINTENANCE 1-PER APPROVED OCN WELL MONITORING WILL BE OFFICIALLY HANDED OVER TO WELLS GROUP UPON REMOVAL OF THE DUMMY WELLHOUSE. Printed 8/6/2014 8:49:12AM 4-1/16"CRY HOLE • J-3 0 SAO is. [WELLHEAD= `ACRJATOR= ' NTIAL KB.ELE /35.4' SUSPENDED BF.ELEV= KOP= !O rtg Max Angle= _____° ,11) 478 ' $ * ' —,9-5/8"TAM FORT COLLAR ( tumM)= E 0 Datum TVD= 1; SS 0.4,vat Ole 20"X 30"INSULA I Ell CONDUCTOR, 80' 215.5#,A-53,ID= 19.250" ielr 0 1 iti rel • .01g ?il pki Ar . . 4 rA ir N PBTO 2608' ;AI ouurs,.drar. 4/1,49,411/4466411/40'I,4/ , - 2,1 tit,e 40tei,140W 9-5/8"CSG,40#,L-80 BTC,ID=3.835" MIMI ' L 16. ih.ak DATE REV BY COMMENTS DATE REV BY COMENTS FRUJHOE BAY MIT , 07/24/14 PKR 272 IMTIAL(SUSPEMX )) WELL J-30 07/29/14 PJC CRLG HO CORRECTIONS 14324T No. 140750 API No 50-029-23515-00 SEC 9,T11N,R13E,780'FNL&1246'FWL BP Exploration(Alaska) I• • 2A,-015 IMM- 2419 3 BAKER PRINT DISTRIBUTION LIST HUGHES COMPANY BP Exploration Alaska Inc INTERMEDIATE FINAL Yes (mandatory) WELL NAME J-30 RUN NUMBER DATA LOGGED /2/2019 (mandatory) M.K.BENDER FIELD Prudhoe Bay BH SALESMAN PAUL CANIZARES (mandatory) (mandatory) COUNTY North Slope Borough BH DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: July 26,2014 TODAYS DATE: 29-Aug (mandatory) DISTRIBUTION LIST AUTHORIZED BY: PAUL CANIZARES (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? No COMPANY CD (FIELD FINAL digital/ ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) LOGS LOGS image) FILM PERSON ATTENTION #OF PRINTS #OF 1-1-(IN 15 #OF COPIES #OF COPIES 1 State of Alaska -AOGCC 1 1 Attn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 2 -RECEIVED AUG 29 AOGCC 3 4 5 6 TOTALS FOR THIS PAGE: 1 1 0 0 0 TOTALS FOR ALL PAGES: 0 1 1 0 0 0 ,,,`?,,i/%%�??, SHE STATE f:,La. :ze ___ and, Gas € ? [til - -\ ,..'i-, '. ,.,_'--:-r,.,-,'_if,----L4:?) iL ,„.,i'L.„.%2, .Y ..,.,.)'.)_— _,„,±'. .,.\_, -' -- 333 West Seventh Avenue GOVERNOR SPAN PARNELL ,Anchorage Alaska 99,501 3572 Main. 907 279 1453 a i6 i5e2 Ken Allen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU J-30 Sundry Number: 314-437 Dear Mr. Allen: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, aei Cathy P. Foerster e — Chair k- DATED this)i day of July, 2014. Encl. STATE OF ALAS ALAS AND GAS CONSERVATION COMMIS* RECEIVED • APPLICATION FOR SUNDRY APPROVAL �JUL� //�4- 20 AAC 25.280 6/'�f�+ro 1. Type of Request: �1 VV V ❑Abandon 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well ❑Change Approved Program ❑Suspend 0 Plug Perforations 0 Perforate ❑ Pull Tubing 0 Time Extension • ®Operations Shutdown 0 Re-Enter Suspended Well 0 Stimulate ❑Alter Casing 0 Other 2. Operator Name 4. Current Well Class 5. Permit To Drill Number BP Exploration (Alaska) Inc. xploratory • 0 Stratigraphic 214-075 3. Address: El 6. API Number: e,Alaska 99519-6612 Development ❑Service P.O. Box 196612,Anchorage, .<c) 7 1-4'/i, 50.029-23515-00-00 . 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? PBU J-30 - Will planned perforations require a Spacing Exception? 0 Yes ® No 9. Property Designation 10. Field/Pool(s): ADL 028281 &028282 Prudhoe Bay/Prudhoe Bay 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft) Effective Depth TVD (ft): Plugs(measured): Junk(measured). 2698' 2698' 2608' 2608' None None • Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 80' 80' 1490 470 Surface 2694' 9-5/8" 2694' 2694' 5750 3090 Intermediate Production Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): None None None None None Packers and SSSV Type: None Packers and SSSV None. MD(ft)and TVD(ft): 12. Attachments: 13.Well Class after proposed work: ® Description Summary of Proposal ❑ BOP Sketch ❑ Detailed Operations Program ❑ Exploratory ❑ Stratigraphic ® Development ❑Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operation July 23,2014 0 Oil ❑WINJ ❑WDSPL ❑ Plugged 16. Verbal Approval: Date 7/23/2014 ❑ Gas 0 GINJ ❑GSTOR 0 Abandoned Commission Representative: Victoria Ferguson ❑WAG ❑SPLUG ®Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Frank Roach,564-4373 Printed Name: Ken Allen Title: Engineering Team Leader Email: Frank.Roach@bp.com Signature_____- 1._ ��_.,. Phone: 564-4366 ._- Date: �./7 4 ///9 Commission Use Only / Conditions of approval: Notify Commission so that a representative may witness ` Sundry Number: 3`�..._ 1,43-1 ❑ Plug Integrity ❑BOP Test CI Integrity Test ❑ Location Clearance R8CMS Other: R$CMS JUL 3 1 '1U'� Spacing Exception Required? 0 Yes 0 No Subsequent Form Required: D 0 APPROVED BY ,/ Approved By: f - / �/ /• -"' � COMMISSIONER THE COMMISSION Date: 7"35 _/`f Form 10-403 Revised 11/20112G I A I ti s a f r 12 months from the date of approval Submit In Duplicateli •• • ,Lastufka, Joseph N From: Roach, Frank Sent: Wednesday, July 23, 2014 3:47 PM To: Lastufka, Joseph N Subject: FW: J-30 wellhead spool for release (PTD 214-075) Attachments: J-30 Operation Shut Down Proposed.pdf Joe, FYI. - Frank From: Roach, Frank Sent: Wednesday, July 23, 2014 3:37 PM To: 'Ferguson, Victoria L(DOA)' Cc: Allen, Kenneth W; Isaacson, William S; Daniel, Ryan; Willingham, James M Subject: RE: J-30 wellhead spool for release (PTD 214-075) Victoria, Since our last discussion,the following actions have been taken in monitoring J-30: Fluid flow decreased to 0.7 bbls/hr and testing still shows 8.35 ppg with 1500 mg/L chlorides. Fluid temperature is now 33°F.The plan will be to continually monitor the well through the side outlet valve during the rig down, move off process. Please see attached wellbore schematic for well configuration.The 9-5/8"casing is filled with 9.8 ppg brine from surface to PBTD at 2,608' MD. • Nipple down the diverter stack, leaving the diverter riser connected to the conductor landing ring.This will leave a 21-X"flange looking up to mount the cap spool. • Nipple up cap spool to the 21-'A"flange.The cap spool has two side outlets and are configured with single valves and bull plugs. The spool has an 11" flange looking up and is configured with a tubing head adapter and double master valves. • Rig down Parker 272 and move off of J-30. Next well is B-07A. • Hand over monitoring to well interventions team. A 10-403 for Operations Shut Down is being created and will be submitted as soon as possible. The interventions team will have the fluid monitoring plan in place prior to well handover. From the well intervention team monitoring, a top job plan will be developed and 10-403 submitted. Once the top job has been approved by the AOGCC and completed, successfully mitigating the surface flow,J-30 will be back on the schedule for resumption of operations per the original 10-401. If you have any other questions, please let us know. Regards, - Frank Roach West-End Rotary Drilling Engineer- BPXA 1 Office: +1 907-564-4373 • • .Mobile: +1907-306-9023 From: Ferguson, Victoria L (DOA) [mailto:victoria.ferguson@alaska.gov] Sent: Wednesday, July 23, 2014 10:14 AM To: Roach, Frank Subject: RE: J-30 wellhead spool for release (PTD 214-075) Frank, Approval is granted for a temporary Operations Shutdown of drilling on J-30. Please outline your proposal in an email as you described in our conversation this morning, ie capped conductor, condition of wellbore, move rig off, monitoring plan,future top job plan, plan to resume operations,etc. Follow-up with a sundry(10-403) for an operations shut down as soon as possible. Thanx, Victoria Victoria Ferguson Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave,Ste 100 Anchorage,AK 99501 Work: (907)793-1247 victoria.fergusonalaska.qov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Ferguson at(907)793-1247 or Victoria.Ferguson@alaska.gov From: Roach, Frank [mailto:Frank.Roach@bp.com] Sent: Wednesday, July 23, 2014 9:39 AM To: Ferguson, Victoria L (DOA) Cc: Daniel, Ryan; Allen, Kenneth W; Isaacson, William S Subject: J-30 wellhead spool for release (PTD 214-075) Victoria, Per our conversation this morning, attached is a drawing of the spool piece we would use to cap J-30 for further monitoring by the well intervention team.The 21-1/4" flange bottom will bolt up where the current diverter stack is located.The inner dimensions also clear the 9-5/8" casing hanger top to protect it for future utility. Currently,the side outlets on the spool (#3 in the drawing) are configured with standard wellhead side outlet valves.The 11" top flange of the spool allows us to configure as needed for the well interventions team. A monitoring plan after the rig moves off is being developed and will be shared with you as soon as possible. If you have any other questions, please let us know. 2 Regards, • • Frank Roach West-End Rotary Drilling Engineer- BPXA Office: +1 907-564-4373 Mobile: +1907-306-9023 3 TREE= • J-30 • WH_LtfA0_ ACTUATOR= O P E R AT D N S SHUT DOW N Kg.ELEV= 85.4 BF.ELEV= 38.3 KOP= 667 • Mu Ante= 10.89 @ 2289 Datum PA)= Datum TVD= Z { 478' I—LTAM PORT COLLAR'D 1 PBTD — 2,608' 1-- 9-5/8'CSG,40#,L-80,ID=8.835' —{ 2694' 1 DATE REV BY CONAVENTS DATE REV BY CON A2NTS PRUDHOE BAY UNIT 07/23/14 FVR CURRENT CONF1GU AT1ON WELL: J-30 PROFOSED PERPATNb: 214-075 API No: 50-029-23515-00-00 SEC 9,T 11N,R 13E,4500'FSL,1246'FEL BP 6cploration(Alaska) • • gra Ferguson. Victoria L (DOA) From: Roach, Frank <Frank.Roach@bp.com> Sent: Wednesday,July 23, 2014 3:37 PM To: Ferguson,Victoria L(DOA) Cc: Allen, Kenneth W;Isaacson,William S;Daniel, Ryan;Willingham,James M Subject: RE:J-30 wellhead spool for release (PTD 214-075) Attachments: J-30 Operation Shut Down Proposed.pdf Follow Up Flag: Follow up Flag Status: Flagged Victoria, Since our last discussion,the following actions have been taken in monitoring 1-30: Fluid flow decreased to 0.7 bbls/hr and testing still shows 8.35 ppg with 1500 mg/L chlorides. Fluid temperature is now 33°F.The plan will be to continually monitor the well through the side outlet valve during the rig down, move off process. Please see attached wellbore schematic for well configuration.The 9-5/8"casing is filled with 9.8 ppg brine from surface to PBTD at 2,608' MD. • Nipple down the diverter stack, leaving the diverter riser connected to the conductor landing ring. This will leave a 21%"flange looking up to mount the cap spool. • Nipple up cap spool to the 21%" flange. The cap spool has two side outlets and are configured with single valves and bull plugs. The spool has an 11" flange looking up and is configured with a tubing head adapter and double master valves. • Rig down Parker 272 and move off of J-30. Next well is B-07A. • Hand over monitoring to well interventions team. A 10-403 for Operations Shut Down is being created and will be submitted as soon as possible. The interventions team will have the fluid monitoring plan in place prior to well handover. From the well intervention team monitoring,a top job plan will be developed and 10-403 submitted.Once the top job has been approved by the AOGCC and completed,successfully mitigating the surface flow,J-30 will be back on the schedule for resumption of operations per the original 10-401. If you have any other questions, please let us know. Regards, -Frank Roach West-End Rotary Drilling Engineer- BPXA Office:+1907-564-4373 Mobile:+1907-306-9023 From: Ferguson,Victoria L(DOA) [mailto:victoria.ferguson@alaska.gov] Sent: Wednesday,July 23, 2014 10:14 AM 1 • To: Roach, Frank • Subject: RE: 3-30 wellhead spool for release (PTD 214-075) Frank, Approval is granted for a temporary Operations Shutdown of drilling on J-30. Please outline your proposal in an email as you described in our conversation this morning, ie capped conductor,condition of wellbore, move rig off, monitoring plan,future top job plan, plan to resume operations,etc. Follow-up with a sundry(10-403)for an operations shut down as soon as possible. Thanx, Victoria Victoria Ferguson Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave,Ste 100 Anchorage,AK 99501 Work: (907)793-1247 victoria.ferauson ac alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Ferguson at(907)793-1247 or Victoria.Ferguson@alaska.gov From: Roach, Frank[mailto:F,. ,-n@bp.com] Sent: Wednesday,July 23, 2014 9:39 AM To: Ferguson, Victoria L (DOA) Cc: Daniel, Ryan; Allen, Kenneth W; Isaacson, William S Subject: 3-30 wellhead spool for release (PTD 214-075) Victoria, Per our conversation this morning, attached is a drawing of the spool piece we would use to cap J-30 for further monitoring by the well intervention team.The 21-1/4"flange bottom will bolt up where the current diverter stack is located.The inner dimensions also clear the 9-5/8" casing hanger top to protect it for future utility. Currently,the side outlets on the spool (#3 in the drawing) are configured with standard wellhead side outlet valves.The 11"top flange of the spool allows us to configure as needed for the well interventions team. A monitoring plan after the rig moves off is being developed and will be shared with you as soon as possible. If you have any other questions, please let us know. Regards, - Frank Roach West-End Rotary Drilling Engineer- BPXA Office:+1907-564-4373 Mobile:+1907-306-9023 2 A TREEHD= • x_30 • ACTUATOR= O PERATDNS SHUT DOW N KB.ELEV= 85.4 BF.BEV= 38.3 KOP= 667 btax Angle= 10.89 @ 2289 Datum IiD= DatumTVD= 47$' —TAM PORT COLLAR ID=8.81' 1 PBTD --y 2,608' t-- 9-5/8"CSG,40#,L-80,ID=8 835' —{ 2694' DATE REV BY 00,4134TS DATE REV BY COMENTS PRUD IOE BAY UNIT 07/23/14 FVR CURRENT CONFIGURATION WELL: J-30 PROPOSED FERNY No: 214-075 API No: 50-029-23515-00-00 SEC 9,T 11N,R 13E,4500'FSL,1246'Fa BP Exploration(Alaska) PTD 2I4 —o�5-- 4110 • Ferguson, Victoria L (DOA) From: Ferguson, Victoria L(DOA) Sent: Wednesday,July 23, 2014 10:14 AM To: 'Roach, Frank' Subject: RE:J-30 wellhead spool for release (PTD 214-075) Follow Up Flag: Follow up Flag Status: Completed Frank, Approval is granted for a temporary Operations Shutdown of drilling on J-30. Please outline your proposal in an email as you described in our conversation this morning, ie capped conductor,condition of wellbore, move rig off, monitoring plan,future top job plan, plan to resume operations, etc. Follow-up with a sundry(10-403)for an operations shut down as soon as possible. Thanx, Victoria Victoria Ferguson Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave,Ste 100 Anchorage,AK 99501 Work: (907)793-1247 victoria.ferqusonaalaska.aov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Ferguson at(907)793-1247 or Victoria.Ferguson@alaska.gov From: Roach, Frank [ ,k.Roach@ bp.conl] Sent: Wednesday, July 23, 2014 9:39 AM To: Ferguson, Victoria L(DOA) Cc: Daniel, Ryan; Allen, Kenneth W; Isaacson, William S Subject: J-30 wellhead spool for release (PTD 214-075) Victoria, Per our conversation this morning,attached is a drawing of the spool piece we would use to cap J-30 for further monitoring by the well intervention team.The 21-1/4"flange bottom will bolt up where the current diverter stack is located.The inner dimensions also clear the 9-5/8" casing hanger top to protect it for future utility. Currently,the side outlets on the spool (#3 in the drawing)are configured with standard wellhead side outlet valves.The 11"top flange of the spool allows us to configure as needed for the well interventions team. A monitoring plan after the rig moves off is being developed and will be shared with you as soon as possible. 1 a • • C�) t ui 4 C m ta. u OD N u -- OmNISI, In A o in o 0 1 { ____ - _._ `4 1 I 31 X clii= .1,.____..... [..._______ u fJ EMI i ai IAF _ Nuns FMM N I \ HZi. 1 - C) Pro 2I4-0q5 • Ferguson, Victoria L (DOA) From: Roach, Frank <Frank.Roach@bp.com> Sent: Wednesday,July 16, 2014 2:13 PM To: Ferguson,Victoria L(DOA) Cc: Allen, Kenneth W;Isaacson,William S;Willingham,James M Subject: J-30 Top job for surface casing; PTD 214075 Victoria, J-30 was spudded 7/11/14 at 02:00. During the surface hole drilling operations,we ultimately weighted up to a 9.6 ppg to TD the well and hold back a water influx.The final trip out was made and the well was static. On 7/14-15/14,the 9-5/8"casing was run with no issues and we were able to successfully cement the surface casing in place with cement returns to surface.The plug bumped on strokes,the floats held,and the well was observed again to be static. During the rig down of the diverter riser,flow was observed.9.9 ppg mud was circulated from the top of the casing hanger to surface. Flow momentarily ceased, but soon began flowing water through the viscous mud. Flow was measured at—3.0 bbls/hr. This morning(7/16/14;02:00),the rig crew shut in the annular on drillpipe. Upon opening the full opening safety valve to get a pressure reading,the 500 psi gauge was not registering any pressure.A 30 psi gauge was sourced this morning (06:00)and installed on the drillpipe to monitor. Pressure has been holding steady at 4psi since 06:00. Plan forward is to perform a top job. If the state inspector would like to witness the top job,let us know and our Wellsite Leader will contact the inspector for timing. If you have any questions or would like to discuss further,please contact me at 564-4373. Regards, -Frank Roach West-End Rotary Drilling Engineer-BPXA Office:+1907-564-4373 Mobile:+1907-306-9023 1 ' 77A, IND MO / `(:- sem` hs r / /, .2 pi' .',,W-J.4,.--:1-; _ 333 West Seventh AvenueGOVERNORSI,,kNA12I:1,1. Anchorage Alaska 99501 3572 .:f-2._*,' Mn[n: 907.17 9 1433 Ken Allen Engineering Team Leader BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU J-30 BP Exploration(Alaska), Inc. Permit No: 214-075 Surface Location: 4500' FSL, 1246' FEL, SEC. 09, Ti 1N, R13E, UM Bottomhole Location: 2617' FSL, 374' FEL, SEC. 08, T11N, R13E, UM Dear Mr. Allen: Enclosed is the approved application for permit to drill the above referenced development well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy P. oerster Chair DATED this ( of June, 2014. STATE OF ALASKA RECEIVE' ASIL AND GAS CONSERVATION CGN !UN 0 1 ,flt„ • PERMIT TO DRILL 20 AAC 25.005 '''.7)(i(4;4 1 a.Type of work: lb.Proposed Well Class: ®Development Oil ❑Service-Winj ®Single Zone • 1c.Specify if well is proposed for: ® Drill ❑ Lateral ❑Stratigraphic Test El Development Gas 0 Service-Supply ❑Multiple Zone 0 Coalbed Gas ❑Gas Hydrates ❑ Redrill ❑ Reentry ❑Exploratory ❑Service-WAG 0 Service-Disp 0 Geothermal ❑Shale Gas 2.Operator Name: 5. Bond ®Blanket ❑Single Well 11.Well Name and Number: BP Exploration (Alaska) Inc. Bond No 6194193 • PBU J-30 3. Address 6.Proposed Depth: 12.Field/Pool(s) P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 12902' • TVD 8635'. Prudhoe Bay/Prudhoe Bay. 4a.Location of Well(Governmental Section): 7. Property Designation(Lease Number): Surface: ADL 028281 &028282• 4500' FSL, 1246' FEL, Sec. 09,T11N, R13E, UM. Top of Productive Horizon: 8. Land Use Permit: 13.Approximate Spud Date: 2159' FSL,2757' FEL, Sec. 09,T11N, R13E, UM June 25,2014 Total Depth 9.Acres in Property: 14.Distance to Nearest Property: 2617' FSL, 374' FEL, Sec.08, T11N, R13E, UM 2560&2469 + 20430' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 85.4' ' feet 15.Distance to Nearest Well Open Surface: x 643106 y-5970565 Zone- ASP4 GL Elevation above MSL: 38.3' • feet to Same Pool: 540' 16. Deviated Wells: Kickoff Depth: 600' feet • 17. Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 124 degrees• Downhole: 3279 Surface: 2435 18. Casing Program Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 42" 20" _ 91.5# H-40 80' Surface Surface 80' 80' 260 sx Arctic Set(Approx.) 12-1/4" 9-5/8" 40# L-80 BTC 2716' Surface_Surface 2716' 2695' 1535 sx DeepCrete, 218 sx Class'G' 8-3/4" 7" 26# L-80 VamTop 9568' Surface Surface 9568' 8532' ,285 sx Class'G' 6-1/8" 4-1/2" _ 12.6# 13Cr85 VamTop 3484' 9418' 8392' 12902' 8635' /417 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth TVD(ft): Junk(measured) Casing Length Size Cement Volume MD ND Conductor/Structural Surface - Intermediate - Production - Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): 20.Attachments: ®Property Plat ® BOP Sketch ® Drilling Program ❑Time vs Depth Plot ❑Shallow Hazard Analysis ® Diverter Sketch ❑Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date 22. I hereby certify that the foregoing is true and correct: Contact Frank Roach,564-4373 Printed Name Ken Allen Title Engineering Team Leader Email Frank.Roach@bp.com Signature / •-.7"----1., . Phone 564-4366 Date (1.3/.0 Commission Use Only Permit To Drill _ API Number: Permit Approv D t See cover letter for Number: 1 1 1 C � 50-Da9-�3SIS-00-6b ( \6\11 other requirements: Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas Q Other: 0,J f e 5 f f o contained Req'd: shales: /,3 3��� �5 � Samples Req'd: ❑Yes ❑No Mud Log ❑,Yes 0 No F/o w pe el eJ/C w a i sv ccl 4 vr-11,1 3 H2S Measures: ❑Yes ❑No Directional Survey Req'd: ❑Yes ❑No c/rii/iv-) of Fi r5 f I oo Spacing exception req'd: 0 YesNo inclination-only svy Req'd: Yes ❑r No p r...1_r...1_ 07✓a A-AC 25, 6 3 3 !� i ElEl V APPROVED BY / APPROVED BY �� II •, S AI. THE COMMISSION Date -�Cf Form 10-401 Revised 10/20 This p 2 i ,I`/• .• t rom th date off ap roval(20 AAC 25.005(g)) Submit Form and Attachments In Duplicate fr / 6//Yii. - l fel ef • 0440 • • 44 To: Alaska Oil & Gas Conservation Commission From: Frank Roach, ODE Date: June 3, 2014 Re: J-30 Permit to Drill The J-30 well is scheduled to be drilled by Parker 272 in June 2014. The grassroots well is a horizontal producer targeting the Ivishak Zone 2: The planned well has three hole sections. Surface casing will be set in competent shale to isolate the permafrost and running gravels. The intermediate hole is planned as a casing string which top sets the Sag River formation. The production interval will be completed with a 4- %2", 12.6#solid liner. The liner will be fully cemented, then perforated. The maximum anticipated surface pressure from the Ivishak/Sag with a full column of gas from TD to surface is —2,435 psi (assumes 7.47 ppg as pore pressure). This well will be drilled by Parker 272 using their 5,000 psi four preventer BOP stack (3 rams and an annular). The BOP rams and annular will be tested to 3,500 psi. A detailed operations summary is included with the permit application. Below is a brief summary of planned drilling operations: 1. Move in Parker 272 and function test diverter. 2. Drill 12-1/4" surface hole to 2,716 ft MD. 3. Run 9-5/8" surface casing and cement to surface. 4. Nipple up BOPE and test to 3,500 psi. 5. Pressure test surface casing to 3,500 psi. Drill out the shoe and perform LOT. 6. Drill 8-3/4" intermediate hole to top of the Sag River at 9,568 ft MD. 7. Run 7" casing and cement to —1,500' MD above casing shoe (TOC at —8,076 ft MD). Pressure test casing to 3,500 psi. 8. Drill out of intermediate shoe and perform FIT. 9. Drill 6-1/8" horizontal production hole through Zone 4 of the Ivishak to TD at—12,902 ft MD. 10. Run a 4-1/2", solid, chrome, production liner and cement in place. 11. Pressure test liner top packer to 3500 psi. 12. Run DPC perf guns and perforate production liner. Perf interval to be determined by as-drilled MWD logs. 13. Run 4-1/2" chrome completion tubing. Sting into liner tieback sleeve and set production packer. 14. Pressure test the tubing and the inner annulus to 3500 psi each. 15. Rig down and move off the well. In addition to a planned well summary, a directional plan and proposed completion diagram is attached to the permit application. If there are any questions concerning information on J-30, please do not hesitate to use the contact information below. Frank Roach Office: 907-564-4373 Cell: 907-306-9023 Email: frank.roach@bp.com Attachments: Well Schematic Directional Plan BOPE Equipment Schematics J-30 PTD Page 1 6/3/2014 • • Planned Well Summary et Well J-30 . Type Oil Producer Object ve Ivishak • Current Status Grass Roots Well Estimated Start Date: 06/25/2014 Time to Complete: 36 Days Surface Northing Easting Offsets TRS Location 5,970,565.29 643,106 780' FNL / 1,246' FEL 11N 13E sec 9 Northing Easting TVDss Offsets TRS Tgt 5,968,197 641,646 -8,552' 3121' FNL / 2756' FEL 11N 13E sec 9 TSAD BHL 5,968,600 638,740 -8550' 2,662' FNL / 373' FEL 11N 13E sec 8 Planned KOP: 600' MD/523' TVDss Planned TD: 12,902' MD / 8,550' TVDss Rig: Parker 272 BF-RT: 47.1 RTE (ref MSL): 85.4 Directional — Baker P7 KOP: 600' MD Maximum Hole Angle: -47° in the 8-3/4" intermediate section -124° in the 6-1/8" production section Close Approach Wells: J-09, N-07 Survey Program: Surface to -1200 ft MD = GYD-GC-SS (single shot gyro) 1200 ft MD to TD = MWD+IFR+MS Nearest Property Line: 20,430 ft Nearest Well within Pool: -540 ft J-30 PTD Page 2 6/3/2014 • • • Formation Tops & Pore Pressure Estimate (SOR) Estimated Minimum Most Likely Maximum Depth Fluid Formation Formation Top Pore Pressure Pore Pressure Pore Pressure Uncertainty Type (TVDss) (EMW ppg) (EMW ppg) (EMW ppg) (+/-TVD ft) (for sands) G1 480 8.35 8.40 8.50 ±30 SV6 1,775 8.35 8.40 8.50 ±30 BPRF 1,950 8.35 8.40 8.50 ±30 EOCU 2,328 8.35 8.40 8.50 ±30 SV5 2,410 8.35 8.40 8.50 ±30 Water 9 5/8 Casing 2,610 8.35 8.40 8.50 ±30 SV4 2,630 8.35 8.40 8.50 ±30 Water SV3 3,075 8.35 8.40 8.50 ±30 Water SV2 3,260 8.35 8.40 8.50 ±30 Water SV1 3,596 8.35 9.00 9.60 ±40 Water UG4 4,022 8.35 9.00 9.60 ±40 Water UG4a 4,055 8.35 9.00 9.60 ±40 Water UG3 4,340 8.35 9.00 9.60 ±40 Water UG1 4,757 8.35 9.00 9.60 ±40 Water WS2 5,235 8.35 8.70 9.00 ±40 Water WS1 5,425 8.35 8.70 9.00 ±50 Water CM3 5,660 8.70 9.30 9.80 ±50 CM2 6,172 9.30 9.80 10.30 ±50 CM1 6,345 9.30 9.80 10.30 ±50 THRZ 6,836 9.50 9.75 10.00 ±50 LCU 7,047 9.60 9.80 10.00 ±50 TKNG 9.60 9.80 10.00 ±40 TJG 7,180 9.60 9.80 10.00 ±40 TJF 7,515 9.60 9.80 10.00 ±40 TJE 7,672 9.60 9.80 10.00 ±30 TJD 7,892 9.60 9.85 10.10 ±30 TJC 8,149 9.60 9.90 10.20 ±30 TJB 8,276 9.60 10.05 10.50 ' ±30 TJA 8,352 9.60 10.05 10.50 ±30 TSGR 8,442 6.28 7.47 8.19 ±30 Gas 7 Casing Point 8,447 6.28 7.47 8.19 ±30 Gas TSHU 8,477 6.28 7.43 9.91 ±30 TSAD 8,552 6.30 7.35 8.12 ±30 Gas 45SB 8,568 6.30 7.33 8.12 ±30 Gas 42SB 8,650 6.30 7.25 8.12 ±30 Gas TCGL-Z3 8,718 6.30 7.18 8.12 ±30 Gas BCGL-Z2c 8,779 6.30 7.11 8.12 ±30 Gas 23SB-Z2bu 8,855 6.30 7.03 8.12 ±30 Gas 22TS-Z2b1 8,918 6.30 6.97 8.12 ±30 Gas PGOC 8,919 6.30 6.97 8.12 ±20 Gas MHO/HOT 8,965 6.30 6.97 8.12 ±10 Oil/HOT 21TS-Z2a NR 6.30 6.97 8.12 ±30 HOT/Water J-30 PTD Page 3 6/3/2014 • a Casing/Tubing Program Hole Casing / Wt/Ft Grade Conn Length Top (ft) Bottom (ft) Size Tbg O.D. (ft) MD/TVDss MD/TVDss - 20" x 34" 91.51# H-40 - 80 Surface 80/16 12-1/4" 9-5/8" 40# L-80 BTC 2,716 Surface 2,716'/2,610' 8-3/4" 7" 26# L-80 VamTop 9,568 Surface 9,568/8,445 6-1/8" 41/2" 12.6# 13Cr-85 VamTop 3,477 9,418/8,307 12,902/8,550 Tubing 41/2" 12.6# 13Cr-85 VamTop 9,425 Surface 9,418/8,307' Mud Program Surface Hole Mud Properties: Spud Mud 12-1/4" Hole Section Depth Interval Density LSR-YP PV YP z API FL pH ppg (2x3-6)rpm (cp) lb/100 ft mI/30min 0'— 1,800' 8.6-9.4 45-60 6-15 40-65 <10 10.3-11.0 1,800' -2,716' 8.8-9.4 25-50 6-20 30-50 <10 10.3-11.0 Intermediate Mud Properties: LSND 8-3/4" hole section Depth Interval Density PV YP API FL HTHP FL MBT pH (ppg) 2,716' -7,135' 9.0-9.6 10 - 15 18 -25 <8 NC <20 8.5 -9.5 7,135' -7,342' 9.8 - 10.0 10 - 15 18 -25 <8 NC <20 8.5 - 9.5 7,342' -9,568' 10.2 - 10.3 10 - 15 18 -25 <8 NC <20 8.5 - 9.5 Production Mud Properties: Water Based Polymer Fluid 6-1/8" hole section Depth Interval Density PV YP Low Shear API FL Rate MBT pH (ppg) (cp) (Ib/100ft2) Viscosity 9,568' - 12,902' 8.5 -8.8 <8 12 - 18 <12 15000-30000 <4 8.5 - 9.5 Logging Program 12 Y4"Surface: Sample Catchers- not required for surface hole Drilling: Dir/GR/Res Open Hole: None Cased Hole: None 83/4" Intermediate: Sample Catchers—as required by Geology Drilling: Dir/GR/Res Open Hole: None Cased Hole: None 6-1/4" Production: Sample Catchers—as required by Geology Drilling: Dir/GR/Res/Neu/Den Open Hole: None Cased Hole: None J-30 PTD Page 4 6/3/2014 Cement Program Casing Size 9-5/8" 40#, L-80 Surface Casing Lead: Open hole volume +350% excess above BPRF, 40% excess below BPRF. Port collar Basis: used if hole conditions dictate Lead TOC: Surface Tail: Open hole volume + 40% excess + 80 ft shoe track Tail TOC: 500 ft MD above casing shoe Total Cement Lead 527.4 bbls, 2,961 cuft, 1535 sks of 11.0 ppg DeepCRETE, Yield: 1.929 ft3/sk Volume: Tail 45.1 bbls, 253 cuft, 218 sks of 15.8 ppg Class G, Yield: 1.16 ft3/sk Casing Size 7" 26#, L-80 Intermediate Casing Basis: Lead: N/A Lead TOC: N/A Tail: Open hole volume +40% excess + 80 ft shoe track Tail TOC: 1,500' MD above casing shoe Total Cement Lead N/A Volume: Tail 59.3 bbls, 333 cuft, 285 sks of 15.8 ppg Class G, Yield: 1.17 ft3/sk Casing Size 4.5" 12.6#, 13Cr-80 Production Liner Basis: Lead: Open hole volume + 40% excess Lead TOC: TOL Total Cement Lead 86.8 bbls, 488 cuft, 417 sks of 15.8 ppg Class G, Yield: 1.17 ft3/sk Volume: Surface and Anti-Collision Issues Two wellpaths fail major risk to J-30. Both failures are in zone and are original wells that have been subsequently sidetracked. Conservatively, both wells have been minor risked and pass the AC scan with that minor risk. Details on the two wells are below: A. J-09 fails major risk with a 262 ft center to center distance at -10,554' MD. Production interval has been plugged and abandoned in 1994 pre J-09A rotary sidetrack. B. N-07 fails major risk with a 622 ft center to center distance at -12,889' MD. Production interval has been plugged and abandoned in 2004 pre N-07A rotary sidetrack. Hydrogen Sulfide J-Pad is considered an H2S site. Recent H2S data from the pad is as follows: Well Name H2S Level Reading Date Comments Parent Well(if sidetrack) n/a #1 Closest SHL Well H2S Level J-01 B 10 ppm 5/17/2008 #2 Closest SHL Well H2S Level J-03 no readings #1 Closest BHL Well H2S Level N-07A 16 ppm 10/1/2013 #2 Closest BHL Well H2S Level N-20A 12 ppm 3/17/2013 #3 Closest BHL Well H2S Level JX-02A 5 ppm 2/22/2013 #4 Closest BHL Well H2S Level N-04A 40 ppm 10/3/2011 Max. Recorded H2S on J-28 100 ppm 5/1/2011 Pad/Facility Faults Formation Where Encounter Fault MD Intersect TVDss Intersect Throw Direction Uncertainty Lost Circ and Magnitude Potential Zone 4 12,615.0 8,762.0 20-30'DTE 100' Low J-30 PTD Page 5 6/3/2014 • Drilling Waste Disposal • There is no annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul Class I waste to DS-04 and/or Pad 3 for disposal/Contact the GPB Environmental Advisors (659-5893) for guidance. Well Control The 12-%4" surface hole will be drilled with a diverter. The 8-%" and the 6-W hole sections will be drilled with well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOP test frequency for J-30 will be 14 days with function test every 7 days. Except in the event of a significant operational issue that may effect well integrity or pose safety concerns, an extension to the 14 day BOP test period should not be requested. 8-3/4" Intermediate Interval Maximum anticipated BHP 3,279 psi at @ TSGR at 8,442' TVDss (7.47 ppg EMW) Maximum surface pressure 2,435 psi (.10 psi/ft gas gradient to surface) 25 bbls with 13.1 ppg frac gradient Kick tolerance Assumes 7.47 ppg pore pressure in the Sag + 0.5 ppg kick intensity and 10.2 ppg MW. Planned BOP test pressure Rams test to 3,500 psi/250 psi Annular test to 3,500 psi/250 psi Integrity Test—8-3/4" hole LOT after drilling 20'-50' of new formation below previous shoe 7" Casing The upper VBRs will be changed to 7" rams to accommodate the 7" casing. 6-1/8" Production Interval Maximum anticipated BHP 3,279 psi @ TSGR at 8,442' TVDss (7.47 ppg EMW) Maximum surface pressure 2,435 psi (.10 psi/ft gas gradient to surface) Infinite with >9.1 ppg frac gradient Kick tolerance Assumes a 0.5 ppg kick intensity over the anticipated 7.47 ppg pore pressure in the Sag/Ivishak with an 8.5 ppg MW. Planned BOP test pressure Rams test to 3,500 psi/250 psi Annular test to 3,500 psi/250 psi Integrity Test—6-1/8" hole FIT after drilling 20'-50' of new hole, target>10 ppg FIT 4-1/2" Liner Top Packer 3,500 psi surface pressure Test Planned completion fluids 8.5 ppg Seawater/6.8 ppg Diesel Variance Request To avoid the risk of plugging the flow line with large rocks and wood encountered while drilling surface hole, it is requested to drill without a flow paddle for the first portion of the surface hole. After drilling past the larger rocks and wood sections, the flow paddle will be put back in the flow line (<1,000 ft). Procedures/Safeguards with paddle removed: • Fluid levels will be monitored in the pits for both gains and losses while drilling. Alarms will be set to indicate if gain or loss of more than 5 bbls has occurred. • The well will be monitored for flow when the pumps are off at each connection. • The planned 8.6 -9.4 ppg fluid will provide over balance to formation fluid. J-30 PTD Page 6 6/3/2014 • • J-30 OPERATIONS SUMMARY Pre-Riq Work: 1. Set a 20" conductor. Weld an FMC landing ring for a Gen 5 well head 2. If necessary, level the pad and prepare location for rig move. 3. Remove well houses as necessary. 4. MIRU Parker 272. Riq Operations: 1. MIRU Parker 272. Nipple up diverter spool and function test diverter. 2. Prepare pits with MAXDRIL-N Mud and PU DP as required and stand back in derrick. 3. MU 12-W drilling assembly with MWD/GR/Res and directionally drill surface hole to Base Permafrost. Gyro survey until magnetic interference clears up. CBU and short trip to surface. Change bit and dial up/down motor bend as required. 4. RIH and continue drilling 12-W surface hole to section TD at -2716' MD in SV5 shale -20' TVD above SV4. CBU until hole is clean. POOH on elevators (if beackreaming is required, RIH until able to POOH on elevators). Lay down BHA. 5. Run and fully cement 9-5R 40# BTC-M casing to surface, displacing cement with drilling fluid. A TAM port collar may be run at 500' as a contingency. 6. ND diverter and NU casing head and spacer spool. NU BOPE (Configured from top to bottom: annular preventor, 7" fixed, blind/shear, mud cross, 2-'/8" x 5'/z" VBR). Test BOPE to 250 psi low, 3500psi high. Give the AOGCC 24 hrs notice prior to testing. 7. Pressure test 9-%" surface casing and wellhead to 250 psi low/3500 psi high for 5 minutes low/30 minutes high (This will test casing, wellhead, and OA valves). 8. Make up 8-3/" drilling BHA with bent housing motor and MWD/GR/RES/PWD and RIH to float collar, picking up drillpipe as required to TD intermediate interval. 9. Drill out shoe track and displace well to LSND drilling fluid. Drill 20' of new formation and perform LOT. Minimum requirement for leakoff is 13.10ppg EMW. 10. Drill ahead to +/-200' and above the CM2, weight up mud to 10.0ppg. 11. Ensure mud weight of 10.0ppg prior to drilling ahead. Continue drilling to +/- 500' MD above the HRZ, weight up to 10.3ppg if not already there. 12. Continue drilling to TD at the Top SAG (estimated at -9568' MD). At TD, CBU, and condition hole as necessary to run 7" casing. POOH. 13. RU and run 7" 26# L-80 Vam Top HC casing to TD. Cement the 7" casing to 1500' MD above the shoe. After bumping the plug on the cement job, pressure test the 7" casing to 3,500 psi for 30 charted minutes. 14. Install 7" packoff and test void to 250 psi low/5,000 psi high. 15. Freeze-protect the 9-%" x 7" annulus, once cement has reached 500 psi compressive strength. Confirm that the OA is open before freeze protecting. 16. PU 6-W drilling BHA build assembly and RIH to the float collar. 17. Displace the well to 8.6ppg QUIKDRIL-N fluid. 18. Drill out shoe and 20' of new formation and perform the planned FIT to 12.5ppg EMW(9.1 ppg EMW provides infinite kick tolerance). Drill ahead, per directional proposal and rig site geologist to landing point. 19. CBU and trip to surface. PU 6-%8" lateral assembly and RIH to TD. MAD Pass as needed once at TD. 20. Drill ahead in lateral section per rig site geologist to TD. 21. Circulate bottoms-up, short trip, circulate and condition hole for liner run. POOH. J-30 PTD Page 7 6/3/2014 • • 22. MU and run 4-W 12.6# 13CR liner to TD. Cement the 4-W liner to top of liner. Displace cement with perf pill and used QUIKDRIL-N mud. Reciprocate liner throughout cement job. Bump plug and check floats prior to setting liner hanger. 23. Set liner hanger/ liner top packer and circulate excess cement off the top of liner. 24. POOH, L/D drillpipe and the liner running tool. 25. Pressure test liner to 250 psi low/ 3500 psi high for 5 minutes low / 30 minutes high after cement reaches 500 psi compressive strength. 26. RIH with perforating assembly and perforate the well per procedure after cement reaches 1000 psi compressive strength. CBU and POOH. Laydown guns and verify all shots have fired. 27. R/U and run a 4-'/z", 12.6#, 13Cr, VamTop tubing completion with GLMs. Space out and land the tubing with tubing tail inserted into the liner tieback sleeve. 28. Make up tubing hanger per FMC Rep. Land the tubing hanger, and run in lock down screws. 29. Reverse circulate brine and corrosion inhibitor into the tubing x casing annulus. 30. Drop ball/rod and set packer and individually test the tubing to 250 psi low/3500 psi high for 5 minutes low/30 minutes high. Bleed tubing pressure to 1500 psi and test annulus to 250 psi low/ 3500 psi high for 5 minutes low/30 minutes high. Record each test. 31. Shear the DCK valve. Pump both ways to confirm valve has sheared. 32. With landing joint still rigged up, reverse circulate diesel freeze protect using rig injection pump. 33. Allow diesel to U-tube, drain stack, and rig down landing joint. Monitor well for 1 hour to confirm well is dead. 34. Install TWC and test from above to 250 psi low/3500 psi high for 5 minutes low/30 minutes high. 35. Nipple down the BOPE. Nipple up the adaptor flange and tree and test to 5,000 psi with diesel. a. Ensure Heet® is left on TWC and only diesel (no water) is left in tree. 36. Install all annuls valves and secure the well. Ensure T/IA/OA all have two barriers in place. 37. Secure the well. Rig down and Move Off. Post-Riq Work: 1. Pull BPV 2. MIRU slickline. Pull the ball and rod/ RHC plug. Install generic GLM design 3. Blue Goo 9-%" x 20" annulus 4. Install well-house and instrumentation and flowline. J-30 PTD Page 8 6/3/2014 . J-30 Drilling Critical Issues POST THIS NOTICE IN THE DOGHOUSE I. Well Control / Reservoir Pressures: A. Surface Hole: No overpressure is expected in the surface hole and hydrates are not expected on J pad. B. Intermediate Hole: The SV1 and Ugnu are expected to be over pressured at 9.0 ppg. A minimum mud weight of 9.3 ppg will be utilized to provide adequate over balance. C. Production Hole: The pore pressure in the production interval is anticipated to be under pressured due to offset well production with limited injection support. The highest anticipated pore pressure is 7.47 ppg. Expected FIT provides an infinite kick tolerance. The interval will be drilled with a substantial over balance utilizing an 8.5 ppg fluid. II. Lost Circulation/Breathing A. Surface Hole: Lost circulation is considered a low probably and is rare on J-pad. B. Intermediate Hole: Breathing and/or lost circulation is considered a low risk with no mapped faults in the area. C. Production Hole: Breathing and/or lost circulation is a low risk with the single anticipated fault crossing with —40-50 ft of throw. If lost circulation becomes a problem, follow the LCM decision tree provided in the drilling program. Utilize good hole cleaning practices to avoid high ECD and prevent pack-off potential which could induce breathing. Ill. Integrity Testing Test Point Test Depth Test type EMW(lb/gal) 9-%"Shoe 20'-50'from the 9-5/8"Shoe LOT 13.1 ppg minimum(25 bbls) 14.5 ppg target(50 bbls) 9.1 ppg minimum(infinite) 7"shoe 20'-50'from the 7"shoe FIT 10.3 ppg target(infinite) IV. Hydrogen Sulfide (H2S) A. As J-Pad is considered an H2S site, refer to the ADW "Hydrogen Sulfide" SOP for the appropriate operational guidelines. The max recorded H2S readings on the pad were 100 ppm in J-28 May 2011. J-01 B recorded 10 ppm on 5/17/2008 and J-03 has no recorded readings (closest wells at surface with H2S samples). V. Faults Formation Where Encounter Fault MD Intersect TVDss Intersect Est.Throw Uncertainty Lost Circ. Potential Ivishak Zone 2b 10,140' 8,870' 20-30'down to E 100' Medium VI. Anti-Collision Issues A. J-09 fails major risk with a 262 ft center to center distance at 10,554' MD. Production interval has been plugged and abandoned in 1994 pre J-09A rotary sidetrack. B. N-07 fails major risk with a 622 ft center to center distance at —12,889' MD. Production interval has been plugged and abandoned in 2004 pre N-07A rotary sidetrack. CONSULT THE J-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. J-30 PTD Page 9 6/3/2014 1REI=_ 4-1116"CtW , SSY NOTES:""4-1/2"CHROME TBG&PROD WELLIEAD= FRAC 11"5M - L11 ,.. ACTUATOR= K AL KB.ELEV BF.ELEV= KOP= 19-5/8"TAM PORT COLLAR,ID=8.835" Max Angle= Datum MD= Datum TV D= 2200' —4-1/2"HE5 X NP,13=3.813" 20"CONDUCTOR 131.45#,X-56, D=19.124" --{ 80' 9-5/8"CSG,40#,L-80 BTC,D=8.835" —I 2716' GAS UFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 43 Minimum ID =3.725" @ 9398' 2 4-1/2" HES XN NIPPLE 1 t ' 9232' —{4-1/2"HES X NP,D=3.813" R X 9292' ---17"X 4-1/2"HES TNT NKR,D=3.856" 933T H 4-112"FES X NP,D=3.813' 9398' —J4-1/2"FES XN MP,D=3.725" LTOPOF4-1/2"LWR H 9418' 4-1/2'TBG,12.6#,13CR-86 VAM TOP, — 9423' 0152 bpf,D=3.958" I 8 9423' —4-1/2"WLEG,ID=3.958" 9428' H7'X 5'BKR FLEX-LOCK LNR HGR,ID=4.32' 9433' —15"X 4-1/2'XO,D=3.870" 7"CSG,26#,L-80 VAM TOP HC, — 9568' 1 .0383 bp,113=6.276" PERFORATION SUMMARY RE=LOG: ANGLE AT TOP PERE: XX"@ XX,XXX' Note:Refer to Roduction DB for historical perf data SIZE SPF INTERVAL Opn/Sqz SHOT SQZ PBTP_IH 12822' • 4-1/2"INR, 12.6#,13CR VAM TOP, — 12902' Vett. .0152 bpf,D=3.958" DATE REV BY COMMENTS DATE REV BY COMu NTS PRUDHOE BAY UNIT 06/03/14 FVR _DRAFT(Plan P7) WELL: J-30 FERMW No: API No: 50-029-XXXXX-00 SEC 9,TIN,R13E,780'FNL&2756'FE 8P Exploration(Alaska) • • IPIn all iii ii ENO tg2 a= Di co vt I O Q 0. Q J C) Q I co` co Qa `° m a st O o a a m Q = .0 0 13 -) oo c a 6 a7 L- M cf) c.) CO 0 • • ® y 1 zo- > to Y�� z � � > yCO vm' O•Mco0 N coM N Co CJ O o n C) Zo 0) D O 7 CLQ 1 g Y_ 0 (N Q N N C_ Y Y O 0 U a a 0� aaa.. m a 8m = r 3 Y d a 1 C . m - , ✓ 0 = Q › � .0 = - d (9 //C��a�cpa, E uul Lo 6i CO >. °y > 4 ©V g a m> ca 6 J co ~• co a C O J J U' a > m 7 O 1 Gt .Of U 1 O 0 .p r C O ' (ND d L J J (7 . i) Mrd. N C K I O F «m ti 0 h C v ° 6 A o m O m C m >V R= =LL 8ro 1v a E 0 . 0 0 m To re O L N a N N0) O r Cu NNuO 0A >. V N O_ V J SZ f3 D y N O co O O 0 O O N O O O a. o) CD n O N m CD O M CO N rt C..- N O CA O CO... Q a m U a C a m 0d CL C _ 0 l' ie 0 O C y O O - W O CL 7! N (0 N m OI 7 W of O) LC Z Of 0 C a t C_ 01 Z W (0 L C L R 0 N N C o_ 1 z° co 3 .0 (n E p 0 Z m p 1 z 1 v } s Q 2. N CO p C`. W 0 N O m m H x 2 a O 0 E r o ce p 1 co a O ca • a N 1, Ch LL cot. 0 W 6 ,_ N O O O N f� Z p O O O 0 CO N 0 O O n QCO o p m 0 C E C L c Q o a a (D d j ca Z N -, O O Z (,� p m co ? m co u a m N N a a c 0) CO 0 C c = • • . N O O O O O O . . . . O O O O W W 0 0 0 0 0 o O O O O 0 0 0 0 -o 1.� 00000 O 00 00 0000 d m `W LL °• 0 o0 m Q O O OO O O 0O O O V- V'o O O O 0 O O O O O OO O O O O OO O csi c.i O U U Z N n a N N g o O Y Y Q O m m a a a s m L L = Y w w m 0 m O O O O O O O O O O CO W V M O O 700000 0 O O O O I- W W N V V CD W W W W W W W W W 7 O M M 0 O O O O O 0 0 0 0 0 O 0 CO CO 0 CO CO E m .-CO CO ,- a- ,- r- .- O O C © a. r+ M M M M M co- ..c M M CO- M M M M M 3 C ' V V V C C V' V. 7 7 V R V w 2 - 0 0 N W CD CD CD W CD CO 0 CD W CD CD W CD di M C ` C O W j3 j, h 2 W a) 0) rn 0 0) 0) 0) 0) 0) 0) CO 0 N- N N N N N N N N N N N W N N 0 U) U) U) Y) Y) N U) In to W 0) U) M d CD W <D CD CD CD W W CD CD CD CD N- CO C ti 371) N In U) N U) t0 0 1A In 0 N In LO LO yf0 o l0 L 0 C r n N- r N- r N- r n n O O O O O O O O O O O O O O L = N- N N N w N a) W 0) 0) 0) a) 0) 0) 0) 0) 0) CO CO 0) d 2 2 2 2 o - 6 N U) N U) In t0 U) 1n IA N Y) V) 6 C 0 0 0 ixZ m •- O_ O_ O_ 'O• O V H V O O O O O 0 O O O O O CD N. CO N Cull NN W.w000000 O O O O O O 0 0 O O 0 0 O O OmdKVN ym .m .m N U d .0 co CO CO ndL ci0i 0 C 2 ,5 rn r. r. % J 2 Z V) o o 12 2 m 2 m 2 W = O >, C + C + c + a 0 rn.22LL11LL � LL N 10 a' a m . + . + . + 0 0 0 0 0 0 0 0 O O - 0 �, v 2000000> > O O O 0 0 0 0 0 0 0 0 v N c N w > > O O O O O O O O O O V CCD 0 C7 2 2 2 2 2 2 a cn u) N m = Z = m a a a o_ 0 0 0 O O O ch ch 6 O O O O O O O O O O CO R N O CO W D7 W W O W O W O In ch O N a co 2 2 2 CD v V v v ri v O v ri v v v ri a) Ca m 0) It a' a' y •- N CO CO V W UNC) CD N- CO 0) o, m U >> H 4 O } F F 0 2 2 2 2 2 2 1 O O O 0 O 0 0 0 O O co V N 0 0 0 0 0 V O V 0 V 0) CO V' CD N O O O O 6 O In O OD a) a) 0) 6 Ch 0000 O O (0 0 0 0) 0) 0) W N CO [t Nt N In CD CD W )- CO 0) O C C C C C C C O 0 O 0 0 0 0 0 0 0 O O 0 0 m m m m m m m O 0 0 0 0 O O O O O 0 0 0 0 a a a a a a• a O O O O O O O O O O O O O O I L 0000000 7 M CO CO M C M M M M M M M E _ 14 a Q! n N ^ N N N 40.. co 7 C C C C C C C •N m m m m m m m N d a a a a a a• a a co 2 O O 0 O O O O 0 7 M co M co co co M O O O O O O O O O O (D (- 0 CO • CO -3 -3 -3 -3 -a -3 -3 00000 0 000 O O coN CO O O O O O O O r2 O O O O .- V f0 CO a • 0 0 0 0 0 0 0 0 U >, O .- W CO O i) .-. CO COTZ n c a' N N n W 0 n CO C 0 a) m C C 1- w N N CO- CO- .-• N 7 d m -ea! m < 0 , O 2 co M M M E L Z a a ) .- 0 0 0 0 0 0 O O O O O O O O O O O N O O O O 0) N. O O n W WO O O 0 C - O 4- O 7 1. O O O O 2 C O O W W T n O O O O W 6 O 10 O W � O O O O Q d N N LO N N ▪ O O O O O N O W O O m O O O O $ C- E .- .- N N 0) 0) 2 ‘-- N M C CV Y7 N W W N CO m O �' U) O Co 0 c m ijo c > m a y a m m c 0 E .g4; - "w c) a- U) � 30 co a in • 0 1111y O n O) M N CO N O O O CD O O CD O O (D CD CO ID Co 1111 O N. CO V N O CO O O O O O O CO CO N v VCO O a ,� 0 0 V (O a0 O N O O o O O O r N N CD .- V O) (O ` O O CO OD CO N- N N O CO 1I n m ;Wm d M_ V o V) 0) V co M M M M M O O o O O O O) CO CO 0 0 0) 0) CO a d • N N N N N N O O O o O o O o N O O O O O O N N N N N N N N 0 Z Q N N N m G Y Y_ 0 0 C co N a a a d a co N N {Q N 3 3 l0 0) 0) (O CO CO N 0) 0) CO0 N. V N N V OD (O O V O O O Z Q CO V 1� CO N N 0 CO O COO to N CO N. OD CO O 0 V V 3 O oD V O IO O 0 M dD f- N M N. O M N of 1- D) V IID L.ri 0 coN. to M r W co CD lD LO CO CO N O W 0) 0) O O O O O O O 0 W O) CO 0 W O) O) O) CO 0 O CO 00 �` a. t M M M M M M M N N N N N N N N N N N N N N G �'' C Cr 'Cr V Cr C a Cr V Cr Cr C Cr Cr Cr Cr V Cr Cr "Cr V O O d E •Y) 7 (D CD CD (D (D CO CD (D CD CD CD CO (D (O CD CD CD CD (D CD CD co M E . o W H rL W W co OD lD O) — O O O) 0) 0) aD 0) N CO N 0) CD V CD CO O 0 V 00 LO CO CO U) N CO n (D If) O O 0 0 O CO n In N 0 I)D oD O) 0) O) 0) o0 oD o0 00 OD N- N 0 O OD O 0) Uco 0 0) O O O CD O O O O O O O O O 0) 0) N- N- (O p coO) u) If) If) O (D O CD (0 (D (O CO (D (D CO (D CO ID ID ID ID If) N 0 L O O O O O O O O O O O O O O O O O O O O 0- :12 N- N- N- r n N- r N- N- r N- N- N- N- r N- r N- N- N- ei) w 0 0) 0) 0) 0) a) 0) 0 0) 0) 0 0) CO 0) 0) CO O) CO CO 0) 0) K E Z - N N (D Y] ID Ifi Y') In N U) V] ID lD Ifi If] N Ifi IP ui ui Vi d C 0 uio - V V ry N 0) 00 O CD V (D I() CD m N CO N- CO N V CO N O C C U N 0 40 (D OD O) CO If) N 00 ' Cr O 0) CO V N. O N N- O 4 d • A N M (D O V O 0) lf) (O a0 Uw d (,� d N co C CD CO 0) O N CO Cr IN CD n CO m O O O C d 0 To it L ). as slit N N N N J F 2 Z (q C -- O Q 0 r (D V) O 1` (D Cr N NNNN N N (D N CO (D ID Ni. CO T 7 o0 V O (D N CO CO CO CO M CO CO O O N V (D I� LLD V I: u] V c0 O u7 O O O co O O to M R 6 O N O N N CO Cr V V Cl- 'Cr V Cr V Sr Cr V Cl- V M N COco c Z --- as(6 a j I- N 0) O 0) V 0) c0 (D O N O O u] N O O o UD N ID CO O CO O (O CO • O 'Cr (VD Cr 0) O COV CL N O W OD n U) (D ID C.0 In 7 ✓ O O O M co O O NO (OO O IOD O 00) 00) 00)) N ID d m 0 O N M V Cr IO (D N. N. OCO O) 0) CD 0 N CO CO 0) Q. CO C N r- r ,- .- ,- ,- ,- c- N N N N N N 7 I- N 0) CD 0) V 0) CO ID O N O O ID Co V O V CD V N N O CO 0) N Cr N Cr O N- co V co O N CO V 0 (O 1- CD ID V N O s- O O) O oD IA (D In (D N V M of N 0) CO CO 0) 0) N CO 0) CO CD CO Cr CO CO aD O CO CO O 0 N CO V ID (D (D N- CO 00 0 0) 0 0 N CO V Cr E r' ▪ N N N N N N N N O ID •- O 1- N O CD CD O O CD O CO N CO N- V I. V O O ID ID N 0) O 0000 O O O (O CO CO CO O N O O V (O ca 0 Ni O O O O O O O ID oD O M (O N op U) — CD 0) CO N- N- (` N. N- N. n CD N ID CO O 0) O) M M N N N N N N N N N N N N N N N N N ,- a) ER ,.,. a co .N co O V N I- 0) O) O 0 O O O O O O CO (D V CD V 0) Co O 0 0 N- LO V ID 00 O 2 0 O O O O O V 0) ID .- V N (O O zQ of r 0 0 0 m o7 0) of 0) 0) 0) of 0) au N- r; N- N- OD OD a) n co a >. V O N N co m ^ C - e- N d l0 l0 (0 N 0 co L L a a s F a F v 0 3 m M M M L _ N Z a a ) -) O - O O O O O O 0 O O O V O O N O 0 O O O O N O 0 V N O O O O O V go O O O O V CD O O 0 O O 0 CoV 0 T a0 J O O O O O co 0 O O O N O o0 0 Q Q Z N 0 O O O O O N a 0 O O I� O to 0O V O O O O M IOD C a O - N M VID YD CO N- oD CO 0) 0) O O LL N M V V D <3- .0 .0 m ..- .- .- ,- .- .- .- _ ,- ,- . co N N aN N N N N 0 y tvIWyCDii o - N N 0 N m Cu. 0 c. d o c d .. a a c E .� yA« N d 1 v. N 0 O. 2) 3 o a rn • 0 ® 1112 0 0 0 0 0 O 0 0 0 0 O U) O UD 0 0 [0 U) N CO O U7 W O O O O O O O O O O 0 n O) U) n ao U) a0 M O DD a ��� O 0 O O O O O O O O O m n n N 7 V (6) N N N '3 m _ 0 o 0 hag LL_ H 100 0 0 0 0 O O O 0 0 0 0 O r- n n N- N- N- n n n n Q a o 0 00 0 0 0 0 0 0 0 o v v v v v v v v v v C M 0 C 6 U o 0 O 0 0 0 0 0 0 0 0 o C) ('i c ('i C U N N Z Q N N N J O Y Y U 0 O N N CL a m a m N u) C) N 3 3 Z C7 M M n U) 0) M n co co N- CO M 0) n n 0) (0 O O '.. M CO U) CO N 7 0 O N U) n 6 V a) n 7 O n O O N M ✓ V Q M N O) U) U) a N a) V O aD n 6 N D) n N n O CD C 1 0 0) 0) co co a0 O co n n n (D (D (D CO U) U) U) sr V M 0) CDc0▪ CO Y C ) CO 00 CO CO CO m co CD CO CO aD CO CO CO OD CO CD CO CO OD 00 CO E « N N N N N N N N N N N N N N N N N N N N N 0 0 m E cg sr sr WNr CDD CO CD NI- Tr cr m (�D co� (�D (�O m (�D m (aD (�D m CID • co co JC O W 4 4 H 2- W CO V 0 0) N M C CD 00 7 U) CD n CO 7 0 U) _ CO 0) M M N O U) U) CO CO KN VCO U) 0) U) M srC M ''- 0D 07 CJ n n N n N 0) (D (D U) O O) n 0) (O (D n 01 CD 0 7 M CO N 7 0 03 n (D U) U) M 0 N- M CO n V ✓ .j• O) U7 U) U) U) 10 U) U) U7 V ? V V sr sr 7 sr OICONN N C 0 1 .E n n n n n n n n n n n n N- N- N- N O O O O O O O O O O O O O O O O O O O O O N n n nn P. a) a) 0) 0) 0) 0) 0) 0) 0) a) Co a) a) a) a) 0) CO m 2 Z m U) U) U) 0)U) U) LO U) U) U) U) U) U] Co0)U) U) U) U) a)U) U) U) U) U) a C o C u) mt) m ) p C f/ N 7 co M M CO M v co CO M CD V co 0) UD 01 7 CD O n 9 112 N w R O N n n N 00 O 0) 0) M U) O n O W n N N co N CO6 O N a0 N 6 0) O U) CO O (D M O M n o w () y M coM a Ni- v v U)N N N N N U) (D n n n U m dTs ix m L N a N N N N N N N N N N N N N N N NNNNN N t� O >>> 0 O 0 CO W3 J F 2 Z y 0 0 Q a) ce U) N O 00 co V a) O 7 N 7 n V n M M 7 N- 0 N- LO 0) O 7 U) 7 co V U) M 03 7 CO V' O r- CO 7 O) 0 Q) N O N 6 O M M 03 CO m n 7 M O V M N N CO M V) I a0 CA O O N V N co N O [O 7 N N N C) CL u) N W m G Z N j M O O n O 0 V CO 10 M O M n O 00 0) CD 7 O M N- O U) N O 0 O aD U) M O 0 O n O O U) CO CO O a) UJ CD U) C7 CMO 0) n U) 00 U) O N UJ a0 a0 U) U) m co W 0) r CO O) CO W CO V n a0 CO CD a0 N- O N m V CO M a a LO CO CD (D n CO 0) O O O 7 N N CO a UO U) CO O) COE N N N N N N N N N N CO COM M M CO M CO M M M 0 U) M 0 O n O O a 7 CD U) M O M N- 0 CO 0) CD V O M ? CO CO V 7 V N CO n V V V 7 C a) M N V M N U) O a) U) U) m n N < N O 0 0 n V a DO a) CO n 0) n n n n M 0 N- N V CD CO U) V CO M '.. U R N CD (O N- n CO a) O 7 7. 7 N CO CO O U) (0 CD N ' 0> N N N N N N N N N M M M M M M M M C. C') M M a 0 0 0 0 0 O 0 0 0 O O V a) 0) CD co 0 CO U) 0 0 0 0 0 0 0 O O O O 0 n CO O) n CO CO 0) CO (O U) U) U) U) U) U) U) U) U) U) U) V (") O CJ a) a) m U) (O .0a) a) a) 0) CO a) a) CO a) Co CO a) a) CD a) a) C0 CD CD 00 aD E 0 (— co .N 1 a co co O O O O O O CD 0 0 O n M n M N CD 0 CO CD O O 0 0 0 0 0 0 0 0 0 CO V O U) CO n N n 7 n- Q CO CO a) Q) a) 0 0 CO a) a) 0) 0) O M 0 n O a n a) a- N N N N CO CO co U N V .-. n .� m n C L of. E m m m m OO O L D a a s O ? m M M M co N. V Z 61 d 4 4 4 O MO O co C 00 0000 0 M co O 0 N 0 0 0 0 U) 0 O R O O 0) •y 7 0000 Nr y n O O a) O O O O N 0 VTO M O O OU (p O OO UM O O O O 0 J O O O O o V7 0a0 O O U O O N- O O O O N O 0 0 0 V OO pj U ) (D n n n CO co O .- r s- N M CO V UO n n 00 NI- ID N N UN N N bN er N N M M M CO- co M M M N M M M M C M 0 L > p 2 7 co)a) COCCOCCO CO0 C .. O d O C Dm .. .0 co cr. E •O y m m eco N C) O. cr) 0 O • 0 ® y _.v 0 m 0 0 0 0 0 0 0 0 0 0 0 0....0 0 0 0 O 0 0 CO W m Cr N O O O O O O O O O O O O O O O O O 0 0 0 a ®�� N N N N O O O O O O O O O O O O O O O O O O O '' d m H 0 coh n n n N- 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 d ..Cr Cr `Cr V O 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O Z U 6 6 6 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O Z U Q T y N N aj N.. n n N N ' J O 0 Y Y O Q O CO CO a CL d d I 0 c c to N 0) LO m N m m Ln V M .-- CO CD CD CO 0) CO 0) CD Cr 3 3 Q M O M .- co U) co 0) M M N N 'Cr N N `Cr 0 0 0 7 V 3 n O N OD 7 n co 07 cO O N V N co m O N V m CO m O N uj u) 0 N N '- O 0 O) 0) 0) CO CO N- CD m LO CO N Cl 0 0) CO CO CO CO CO m m n n n n n n n n n n n n n N- n n CO C IN N N N N N N N N N N N N N N N N N N N N N N O 0 d Lo � N vr LVO CDD LVD LVD CD COCr VCD LVD (VD (VD LVO LVD LVD LVD LVD LVD CDD CD CDV co M C0 W -, r j, 2 w CO N- CO N U) CO LD n CO V) CO CD LA CO LO LO n N Cr CD m M m 0) CD Cr N 0) n U) N Ln 0 m LD M M N M Ln LD V n m O N n V Lf) n O) LD M V m co d 0) CO N- M 0 Cr M CD 0) CO CD 7 O) N LO CO N N U) CO V V -0 C) .- )- 0 O 0 0) 0) 0) CO n n m m U) 1f) V M CO N N L- o C L L O O O O O O) 0) 0) 0) m D) 0) 0) O) 0) O) 0) 0) 0) 0) 0) 0) O) m ig N- n n n n CO CD CD CD CO CD CD CD CO CD m CD CD CD CD CD CD CD W N co O T CO CO 0) 0) 0) 0) W W CO 0) 0) O) 0) 0) 0) 0) 0) 0) 0 O) d �' CZ .�. LD In Ln LD LD In LD Lf) lD L)7 l0 In lD ll7 lD LD N Lf) N lD In LD « C d 2 CL V C d L) d 'O i7 d V O n CO a m 0 0 CO Cr Ln m 0 CO N LD CO 0 M Ln CO m 0 M LO CD )- 0 0) CO N m a 0) N m O) O N u) 0) N u) O CO N LD CO o C C m w N N CO V CO n N O V O O W m m n CO co V V V M N O w d 0 W co m O O N N N CO Cr Cr LO [O CD n CO O) 0 O N M a 0dre11 . 1 re ix T N N CO M M CO CO M CO M M M M M CO CO CO V V V V 'Cr Cr L d 0 > 0 0 c d W 7 J F- 2 z O) O -e0 CL CD W CD N N V CD M V LD n- CO m M n 0 CO Ln N O) CD n Cr 0) T CO O Cl. L- CO U) CO Cr O O N Cr M CO V LO N m n CO CO m m t0 OD V LO CO CO V N O m m = V N O m m N 7 N O m m N CO N LO N Cr 0) CD N 0) CD CO 0 CD CO 0 0 N- a 0 M co C D CD N CO D O) 0) O _ _ N CO M co Cr N m z 7 co Cr 0 0) V 0 0 00 CDnN m M 0 CO LO m N O CO Cr 0) LD 'Cr LO 0 O n O co O n M O O CO M 0) m a 0) O N- f0 O (V M U) Ln m CO O Co 0) V N.: n 0) N V N: d N CO N m N CO IA O N- N N a .: CD V m U) t!] M O n CO n CO CO 0 0) 0 0 0 s- N CO M CO V LL) m m n n CO 0) 0) UL cnn l') CO- CO- M L`') V a C V V V V V V V V V a V V V v 7 2 0 In m ,- 0 0) LO 0 0 0 CD N CO CO 0 CO LD _ m N O CO Cr 0) LO N CO m 0) m C U) m V V n n Cr V O n M 0 CO CO N CO n m 0 L- CO (0 0) U) .- V n O) N N Ln n O M 0) N- V 0V 0) CD M 0 N CO Ln N N- CrCrCD 0) L- 0) OD CO O) 0 0 )- a- s- L- N M V; V V Lo co co m co m m 0) O 0 E M M M V V V V V V V V V `Cr- 2 O M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 M L- O) m CO CO CO CO m m m CO CO CO CO CO m CO CO CO CO CO CO CO m n n n n n n n n n n n n n n n n n n n n n L m m m m m m CO m CO m m m m m m m m m m CO m CO CO L- e- N- L- C- .- ,- ,- a- a- 1- .- C- A- a- .-- C C a- .- )- n- a- E 0 Qm 'N Q N 0) CO O 2O O O O O O O O O O O O O O O O O 0 O m 0 LO Cr V V Cr Cr V Cr Cr V Cr V V V Cr Cr V V a V V Q V m M 0 M M M M M M M M M M M M M M M M co M M M co V V V V Cr V V V V V V V Cr Cr V V Cr V 'Cr V Cr CO CO LA -a m N-- C a o m m m v 0 G v c07 L`07 c07 0 2 m O z O D -) -, 0 0 0 0 0 o N 0 v 0 0 0 0 0 0 0 0 0 0 — 0 0 0 0 z O O O V O o n o - O o O 0 M 0 0 0 0 0 M 0 0 0 0 al O O O Ln N O co O M O O O O N 0 0 0 0 0 00)) O 0 0 0 0 a L 0 O ,- N N CO M E v 4V LO m n n CO 0) 0 L- N N M Cr LC) m Cr MG g'.... CO: C V v v v v v v v v v c 6 4 4 ..6 ri 6 D = n n vU) Ln 4 Com f p M D m 0 0 Ca o c d 0 ac om " °m vo CV van3o if. 01 • S 0 , .... . 0 . 0 0 . 0 O 0....0. O __...m m l0 CO CD N CD N a 0) CD O ■ W O o o O O O O O O O O 0 V 0 co N V CO VN CO �.� O O O O O O O O O O O O 0 u) N m M m (O '5. r r V V V .- CO ,-• ,- NN CO � WU kil d LL _ O _ F O h 0, 0 0 0 0 0 0 0 0 0 0 o n N- n n n n n n n n n a a o 0 0 0 O o 0 0 0 0 0 v v v v v v v v v v v o O O O O O O O O O O O CO ri ri c6ri CO ri CO CO CO CO 0 N N z Q 0 N N d0 O Y Y O O D O 0 CO CL 0_ d a m U 0 l0 N 3 3 f0 N 0) n N N 0 n u) N- N 0 m N N n m m n O O Z Q 0 0 0 m 0 0 CO m CO CO u) n 0 N 1.0 l0 CO O CO CO R 7 3 V u7 n CO 0 CO N u) n n Oi V n CO n 0 0 m dD N m 0 co N- CD CD u) 0 a CO N N 0 0) n u) CO 0 0) CD co) N CD m m m m m m m m CO m m m m N u) 1f) u) N u) NI. c{ N N N N N N N N N N N N N N N N N N N N N N j0 0 d � N (OD 0 CD CCO CCD CCD CCD 00 CD 00 CD OD CCD CCD CD CNt CD CCD CCD 0O CD COO CD co M ` •C a d >»> -) H W W .F. _ m co N- CO u) V co co V R co .- CO m O 0) N n CO m m V 0 N N a N V N 0 CO t0 0 V n O r u) n m m O N O V1 V_ a n 7 n to m n n (N d co COr O N- 0 CO N n 0 0 co N- .- CD N- CO N 0 m O .0 p) 0) 0) m CO N- N- CD CD U) u) 0 V 7 CO CO N N c- .- .- ,- 0 C O C CO- CO- m CO- m m ao m m m m m m m m ao m m m m CO- 00- e t t C CD CD m m CD CD CD m CD CD CD CD CD CD CD m CD CD CD CD CD CO Z 0 CO 0 0 0 0) 0) 0) 0) CO 0 0) 0 0) 0 0 0) 0) 0 0 0 0) 0 V7 U) N V7 u) U, ID 1)i U, lD t!i V7 u1 V7 u1 V7 U, V7 u1 N U, ui d c 0 2 6w m 'O N <- N 6 V V d = coO CO m u) co O m CO u) n V 0 CO N N 0 r N m m CO c 2! C )0 co co r R CO N r n CO O CO CO V N u) 0 V 9 N O u) O 0 OD O OD N- n n N O u) CO O N- O ? d CO () N u) CO nn m CO 0) 0 0 N CO V 10 N- 0) CO Nt m m d d 0 L Niii V 7 V V V 1" V ID u7 In u7 u; u) u) u1 u) ID m CO CD CD m Q' O > 0 O 0 R O W 2. J I- 2 Z N c 0 0 a> CC CD CO 0 CO 0 CO 0 n 0) CO 0 CO 7 CO m LO 0 0 0 u) T 0 0 .- O N CO O V 7 N- u] u) 0 O 0 m 0 m0 > m u7 CO O 0 n m )O CO l0 0 .,- m O6 m V m 6 O n C u) CO O. c- N m u) iACO 0) CO LO m n n N m 0 0 0 O O .- N N CO N 7 V' O O. 48 N N N N N N N N N N N N N CO C Z c t0 o_ N N. N 0 CO O) O O N m N 0 N- co N N 0 CO 0 m O N 0 m O N 0 CO N O 0 m In n O N N n C' O N N M co C CO N CDD uCD m) CD ci (`M7 m O 0 N- CD 0 V N N N d my O N N CO Nt V u) N m m n n CO 0 O GN u) u) N u] N u) u] u) )0 u) u) u) u) t0 )0 u] u7 tp co m c0 CO- a ? N- N 0 CO R 0 0 u) CO V O n M ,- N_ N 0 0 N M0 V m CO O a m CO n m R MN 0 u) CO V CD CD u) m O CO m 0O a CD m u) m n O n u) u) n n O co O CO N )O N 0) n a V a 0) n CD a CO N 0 N N CO CO V V u) u) m m n n n CO 0) 0 — N N CO V V70 N u) LO- 0 U) u) l0 V7 N In l0 V7 V7 V7 V7 m fD m m m m 3 0 0 0 0 0 0 0 0 0 0 0 N n CD 0) 7 0 V 10 N- CO Ali OD CO CO m m m CO CO m m CO N0 N 0 V l0 CD 0 N N.: n n n n n n n n n n O - M m O V 0 u) n N Lm m m co co CO CO CO CO CO CO 0) 0) 0) 0) O 0 0 N CO j ,-- .- .- .- .- .- ,- ,- r' .- ,- ..- .- .- N NNNN N N NR 0 CO •N Y Q O O O O O O O O O O O n N 0 0 CO _N N CO 0 CO 0 C v v v v v v v v v v v v c u) n m CO m CO n Q CO CO CO CO CO CO CO CO CO CO CO O 0i r•-: V .- 0) m a CO N O 7 V V 'a 7 V C a V 7 V co V CO CO M M NNNN N N W 0 >. E m d NO d ill N O L L ~ O 2 co co, M M 7 n Z a d0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 n 0 0 0 O O N 0 0 O n o 0 v0 O 0 0 0 0 0 0 0 v) o o T O O O O O O u) O O M J O ? O O O O O O 4O O d O O O 10 O O O O O O 0 co O O O O O O co O 0 O Q 2 n m 0 0 O c- N N M Nt NJ. u7 10 m n m 0 O ,- N M C v) ui y CD CO CO- CO N m CO- CD r u(0- m cO m m m m r...- N n h .0 0 0 0 c iU v °Dd 3 3 vv at 0 a o pd — .+ ddN dc R 0 • 1111 CO 0) u) u) ..- a0 0) O O O O O O O O O_-..0 O O O O CO W O N CO N CO M 0 O O O O O O 0000 O O O a ,- N O T03N O O O O O O O O O O O O O O ''��Z d CO �� o I O N H 1 1 1O 0) n n n n n n n 0 O 0 0 0 0 0 0 0 0 0 0 0 0 a CL V V V V V V V O 0 0 0 0 0 0 0 0 0 0 0 0 0 O U C') C) CO C') C') C') M O O 6 6 6 O O O O CD CD 6 O O U Z N N Q N N.- N Of 7 N N ' J d 0 Y Y O 0 o Nd a a y a m N N D N lc M O CD CD O O O O N 0) N O CO (O O n V N CO CO O O Q V N u) CO n n 0 0 cO CO s- CD o CO r N O M M N V V O m m n V O s- O u) O n N n CD O N CD M 6 C)j C..) Y co co O n NI. .� O 0) N- V O n O M O CD V M 0) CO p co CO _ V V V CO CO M M N N N N N O O O 0) 0 O O d E N 7 CD CD CD CD CD CD CD CO D t0 CD CD CD CD CD CD CO CD CO CD CD C 4) co co ` C 0 'N I N V O 0) CD O CO n _ _ CO N N CD CO M M CO V V V u) M M O N CO of u) W CD n Ni OD O n (I O) n N ! M M ' 0) n N u) M CO d N- CO V V co V V V V N C 'O 0) O O O O O O O O O O p CD O o CO O O O— O— d t L m O aD a0 O lD m CO O m (0 a0 0D OD dD lD l0 O O O a0 co CD CD CD CD CO CD CO CD CO co CD CD CD CD CD CD CD CO CD CO y N 0) 0) Cr) 0) 0) 0) 0) a) 0) a) a) 0) a) 0) 0) O) 0) 0) 0) 0) 0) 0 2 Z .... v1 u) vi vi vi vi vi ui vi CC7 u) vi vi u) U) u) 1f) N vi vi Cri d c o C U) C) is g2 V y CO n n CO CO CD 0 VCO n N V CD CO u) CO V O n CC U 0) cr M n V M M W O l0 6O O O) n OD CO N CO O d W N v) u) O W M N n O N (D n N O n (O O O W V w d V N a) V n O V u) lD N- .- CO V CO CO v) CO N u) 0 K �, al CD 11 n CD m 2 co ca CD CD rn CD 0) o 0 0 i6 O o r Z. r4 w J1- 2 Z CO 0 W 0 CI. a) a' 0) u) CO V v) u) O CO CD A CO Ni: O n u) u) s- O v U) N N- V n CD O PO) N a u) 0 C•) N aD CO u) O u) N V M u) CO CD N 0) O n N- co OO O O O cocoCD 0 N Z V V v) 4) LO W N- n V a M M LO U U) v) V V V V V V V V V V V V ay N N N N N N N N N N N N N N N N N N N N N W c Z CO CL N 0 N n O n M 0 O N CO 0 V 'C0) O CO N.- O M 0) O 0 N CD CO n n O 0 O CO O u) Q1 N O CO 0) O a u) Q) M CD N CO O O M n f0 O O CO (O O v) M (O N d V O O 0) N co 0) O V n n DD CD u) u) .- CO n C1:1 co V u) CO n n CO m m 0) O O •- N CO V u) U) CD CD O) N2 CD O (O (O (O O (D CO (O O n ri ri n n n n n n EL ON N- O n CO O O N CO O V 01 O 0 N- O M 01 O V CO O n a V u) CO V N u) V O) M CD a O CO V O V 0) C') CD N (O u) CD N N u) u) (O N u) O O) N n co O 0) 0) co co O N n CO CO CD u) CD V V CO O N N N V u) u) 0 n CO 0 CD 0) O N N CO V u) CO CD n N- 0 0 .- CD CO CD CD CD CD CO O CD n ri n n n n n n n n n 2 V M .- N CO O O O O O O O O O O O O O O O O 0 CD O n n O 0 O O O O 0 o 0000 0 O O M O N .- V V V V V V V V V V V V V V V L co V v) CD n CO CO CO CO CO CO CO CO CO CD CO CO CO CO CO CO 7 N NNN NNN N N N N N N N NNNN N N N N 0 N C 0 .N 4 a �M 7:7, O CO (N O 2O O O O 000 O O O 000 0000 0000 O O O 0 00 O 6 6 6 m O CO ,— Q N N N N N N N N N N NNNN N N N v) 0cv T O a) 0 m n c r Ca st o m m m v L L a 0D Q n 0 CD M M 7 coZ z a a '� 4 4 u) O O O O O CO M O O V no O O O O O V O O O O O O O O 0) 0) O O O O U O O u) O 0 O co O O u) T N O O O O O u) n N OOO OON V O O O J O O O O O O ' O O O O O O O O O O O O n O O CO 7 MV uCO n m CO CD NI O O N .- N N M V uu) CD n n N- �n r- r- N- C- ' t r-- N m co K co- co co 0 co m m m LL co- co co w u) T 0 nyH I I- -) On` 2 7 U I- FcC .. 0 d C C° dco d c dm no 12 N • 9 . N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O 0 0 O 0 O 0 O o 0) N U)N C W a `®MI 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 mai 1 .� N .- m `'�W; _ A o ~ U0i 0, Oo 0 0 0 0 0 0 0 0 O O O O o o a d O 0 0 0 0 0 0 o O 0 0 0 0 0 0 0 v v v z U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ao 00 0 Z N N ^ Q O) NN N 01 J O Cr) Y 0 — Caa, a. a Cl) a CD = = 3 N N 0 N 3 3 CO CO CO 0 N- cl N 0) CD CD 0 CO M O) N co0) N O O Q V U) CO C C n CO C M CO C 0) N 0 M U) N. C NJ- Cr 'CN Cr , CO 0 co a CD r ,- co Co Ui a ri 0 •- m Ifi Ui U C N O 0) U) N O CO U) U) N 0) a) a) a) C CO 0 CO CY CO C Q7 C CO CO CO I,- 0-- 0-- 0-- N. co co co C co CD CD co C CD CD Cr Cr CO 'Cr CD C Cr C Cr V C C CD C CD C 0 O Cl) .E y CO CD D D CD CD CO CD m CD CD CD CD CD CD CD CCD CD CD Cl) M M = C_ a co j, A N` 2 W W U) U) C CD CD N- CO N. U) CO CD N a) N N N CO ' 0 00) V Cl) N V 7 U) 0i N n u) M N .- N- W V n N N N ri vi U) CD hi U) N N CO CO d' C N CD C CD N- N- OD CO CO COCOC 00 Et' O C co- co- co- co- co- co- C C C C C co- co- co- co- co- co- C aD t L V co co co co CO CO CD CD CD CD CD CD CD CD (0 (0 CD CD CO a) t+ N C a) O) 0) O) O) C 0) 0) W C 0) a) m 0) a) a) a) 0 ar 2 Z .�.. U) lD U)N N U) N U1 N V) UN UU) ) 1 U1n 1 1 n N U) 6O 1 D m 2 A C V m Q N N C CO CO CO C CO W U) M N- O M U) N C V O CO N C M CO 0) N CO N V N 0) N- U) U) CD ` w A .-• U)• • 0 Ui O C 4 V a) N 7 0 N. N. 0 a) O) V O w 4! U W CO N N CD 0) CO C 0) 0) N CO U7 U) U) C C CD O U a) K a a c' N N N N CO CO M CO CO C Sr_ U) i{:2 Z m d co J 12 Z N 0 C1 0 = coW 0 0 Cl) a U) CO C CO CO C Cr N N- N- 0) 0 N CD C N >, 0 CO 0 N- 0 M . N CO 0 M CO 0) CD U) C V V CD N Cr) n C n M C d ..- U) U) CO V N N O 4.1 N 0 O CO C C N- N- N.. CD CD U) U) CO U) U) C C VV cr V M M Cr) CO CO M M CO CO M M CO M M M N N N N N N N N N N N N N N N N N N N m a. y W c Z co a N I V 0 0 CO N CO 0 M 0 C 0 U7 0 0 0 V O CD O CO N. O 0 V (` 0 0 V 0 CO 0 0 0 co 0 0 0 a O M N f` O M ai CD O N Cr) N CO 7 r h N co N C �-- O V C N- W CO CO V V U) N. N- C17 U Ca N- C C 0) 0 r- N- ,- N N M M C V V 7 sr Ni- U) OH r` r t` aD m ao co- co- a0 m co- co- m oD eo co C aD Ct.- v O 0 CD N C 0 M 0 CO 0 U) O O O R O C CD N. V Cr CO U) V co 7 N V V n V V V C W N. N CO a) R N CO N. 0i N.: 0 N a) Ni N N. O N- 0 0) CO M CO CD N- CO C N M M M CO (C. M CO 0) 0) O O N N CO CO V Cr U) U) U) U) U) U) CD 0 N- N- n m OD 00 OD CO- CO- CO CO- CO- CO- CO- CO- CO- CO ao m N I 0 O 0 0 0 0 0 O 0 0 0 0 O 0 0 0 N CD 0 0 0 0 0 0 0 O CD 0 0 0 O O co O C W CO v v v c V v v v v v v v v v v v ui Ui 0 . C CO OD C CO CO CO OD OD CD CO CO CO CO CO CO CO OD 0) N N N NNNN N N N N N N N N N N N N E _ 7.1 _. a m •N Q Cl) 0 0 O O O co O O O 0 0 O O O O O co co V 0 0 O 0 0 0 0 O o 0 0 0 0 0 0 o O co 0) CD Q N N N NNNN N N N N N N NN N ai N N N 6 b C U TV U) N (D N- C t. CO ECO V C C ON) - N Q O to CU CU 1" 0 a a 1 t "0000co D coCO CO CO o 'o a 0 2 z Cr_ a J, J, 0 O CD 0 O 0 v 0 CO 0 CO 0 0) O = ct Cl- o 0 V o co 1, O O r O O co V O V O CO O NU) 0 C NA U) N a) 0 CD Z T 0 0 M O O o C O 7 0 U) O N U) • f� C UiQ Cl, O O N. 0 0 0 cr 0 CO 0 C O C CD ‘S' CD 'N N.- 0 CCO 0 aO 0O a Z co 0) 0) 0 - N N M M Cr C U) U) a U) U) a U) U) 0 CD CO 0 • .Q 3 0 Co CO CO- 0 CO- CO Oi 0) U 0i C7 m CO- CO- 4 m ai 0 0) t 0i U 0).- t 01 0i D) 4 h F -) ' - N N: m 7 1- 1- 1' 1 F F CDcO ..N O D 0 C O .. _ _ .7 O r d d dCa O N U a co 0 a co • • ® N u) u) N- 0) V V... O. V W _.1f) M N r M M co V _�_. W N u7 u) CO. [O N O 0) V Cr 0) N O co u) co coa os� u) V ._ — — O O N N M O O W 0) '3 N N N N N N N N N CO m :I1 R o O _ H 0 o 0 0 o : : :U). : : 0oOOOMM MMMM00ao aoao0Conr Q g NNNJ CYY 0 —(0Na_a m comv = 7 YN37 (0 O O V U1 VmaD 47u) VOO Z a O N V O O) MOMV u) 0) (Oa)VV O 0 I` u) M ui r. (ONN M : ul V vi Lri U Cr) M CO CO N N O u) M CO u) V N O (O CO p (Y u) CD (l') u) u) u) V V V M Cr) M M M M N N N O O m •v) 0 CO O u) (D 0 V7 O 0 0) CO (D (O fD 0 O CO 0 co co m c 0= W 2 w u) V u) M N. (0 M M N (O O V 0) CO co co co N. 0) (.0 u) N- N. 0 u) O N O CO 0) CO u) u) W D) O O 0) n co N u) M O N O .-- N O V W 0) N N V V N- CO 0) .- M V uu) N N ] (0 0 .13 0) I- .-- N N N N N N N M CO M co co co co co co ` t L co- co- CO co- CO m CCI 0 co- CO co- m co- CO CO CO co- m �' (O CO O u) u) CO O u) CD V7 CO O co to (D (D CC) u) m t+ N O OCD CMO) O) W 0 0) a) W T W 0) D) 0) W O) 0 2 0 —. co- co- co- co- co. u) u) u) u) u7 u] co- u) u) u) u) co- u) C O C mO O R U m C = co N. N- N- M M O CO O u) V W V N u) E C 4.) V M CO O CO 0 (O u) O co co V co co co M m G a) w m N M ui u) V u) N N u) M O N O 0) a O N N O w m 0 — 0 (0 N N CO 0) L- CD I� 0) 0 — V 0 co co 0 m m L N d u) u) u) u) CO (D co. (O n N N- I-- CO CO CO CO CO 0) c0. Ce cz) t Z '2 H , J F 2 2 0 G W st0 0. N O D) CO 0) 0) N I- o V N- co 0) N N CO a N. M O M M O (D CO ..- I. O V u) M CO V V W N.: n ui V (D u) O ,- O 0) r m tri W O) CD N.: N a) co co CO CO u) u) V .- O O 0) co N. N- CO M Cr) M M N N N N N N N N N _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ a N N N N N N N (IN N N (IN Cif N N NN (if N m O 2 7 (6 a N M O N O O 0-: O O O Cr) C) O 0 O 0 0 V O 4) O 0 u) O (O O N O O 0 0 1.-- O 0 O p a O a0 n O CCI O O) CD N o u) O N C- O CCI ai W )( u) co V LO N I� CO u) u) h U) co O 0) co m CCI y N u) o) co n I.- I,- OD CO CO CO O CO CO 0) a) co co Q. p ren co co- co- aD co- CO Co Co Co co- o Co ooco- ao au co- aD o ' co O N O O N. O o) O M O o 0 0 T-- O O V co V M V V O V O V CD V V V V V4- V co M u) C') (O V V N- u) O N O N (D C) V V LI-) u) co co O O co N- 0) M V u) 0 N- co O O N O CO N. n CO CD CO CO CO 0) 0) 0) 0 a) 0) 0 O O CI u_'' CO O CO CO co- co- O CO Co Co co- CO co- CO CO 0) 0) 0) 7 co co N 0) 0 CO CO .- N (D u) V O CO co co O I co V N- n O) 0) 0) co N- co CO co co N- a co N V V (D co O u) V N O O O) CO N- C u) L 0) 0) O) O) 0) 0) 0) 0) 0) 0) CO a) 0) co co co co co N N N N N N N N N N N N N N N N N N N N a (_° .N _1 0 co Q 0 F J CO N. u) CO CO CO ' CO CO C co a) O) an co V V V V co 0C) 0 O ,- co n V O CO N u) N- O) co Q O '• - 0) 0) N- m m O N co O 0) M O O CO M M M V V V ' V u) N u] u) u) 0 O co (D N (0 O OVI O T 0 ^ (O 0 CO N C CO N O N O N N O LLa as i- u O 'O co o 2 co co0M M O M N N t m Z a a -j O co O 0 aD CCI O (O CO O 0 N o u) 2 O O N N 0 M CO O O N- O O0 N O O O 0) m O u) N V) N V (p O N u) O T O N O N U) ol O u) J O u) d O CO N (D (o O . o N M O Q m O O O O 0) O co p 0 M C) O , M V n 0 V V O Q t N- N. CO CO 00 0) 0) O O J L- r « 0 N N N U M -0 c 6 a) co o cn N m r a) a) o o 0 0 o y o = o O o y o 0 o O o Lo (I) p u) N .4 .5 s- 0 00 C . 2 = a a C/) Cl) m N LL a N N 0. 0 o a ) C m _ E am+ m N N C) N c) ain33p a co • • • ® y N CO m COM COa N O m N c- 7 1n O O 0 CO N- 7 '- O O 0 0 0 0 00 CO W O O 0 0 0 0 a U) O 0 0 0 0 0 0 -Q kill ,...07 m m m m m m O O O lO 6 N U) O O O O O O O O CO 'W� �/ m o CO0 0 O O O o O O O 0 0 O co co co O o 0 O O O O O 0 a 7 CO M co co co co o O O o N N N 000 000 0 O U 0 0 0 LD Cu 00 0 0 0 o C) C) C) 0 0 0 0 0 0 0 0 0 U Z Q w N N Q J e Y Y Q 0 O m `m a CL a m W W > > O O N'''i 7 O CO 0 CO o a a U7 O a 0) O N CD 0 N m 0) N CD 0) V' s o M N n M o a O m O n N M m m m OO0O O O 0UL O N- N N CO NNNm N N N N N N N N CO M CO N O 0 4) CO n m CD U) U a CO N O Q) CO n mO 00 m ) N OO O O O O O o O O O 07 W 07 j) QC a. o m aa CO Lo Lo O aLo CD Sr CD <o aaa CD o CD CaCMMm CD CO CD CO CO CD CD CO 0 O m E N co co 3 G U W H 2 w CO N M (7) O N- a N O n m 7 o O O 0) W CO CO m CO CO CO m N n 0 m LO a 0 CO a N- Ln Ul 1n a a .Cr a a a O m m W m O O N a O Ln Ln m M O n U) M W n d n n co co O N N co a LO LO CD m N- CO CO 0) O N N co V .0 C) M M M M a s a a a a a a s a a a a LO LO N LO LO d t L co" co- :g m m m m m m m m m m CD a0 a0 m m m m m m m OS m CD m CO m CD CD CD m CO CD m CD CD CD m CD CD CD CD CD y t N W d) ) CO Q1 O) 0 C7) m W CO W COCO 0) CO 0) 0) O) 0) W 0) 0 2 Z 0 .9.. N V7 LO Ln N In I!] N Ln N lA N CD N LO to 1!) LO UD LO LO N 0 NN O 2 C 4JL) m 'p V V y 7 m m a CD 0) 0) a n O Q) M M V CO a s N CD CD N- CO CO C C V a 0) a M L!] m N 0 n O U) m n CO CO CO m CO m CO CO M 9a) m n M m O) 6) m N O)o CO m n N n N m m 6 a s M M O w m () N 'Cr N- N N N 7 N N 7 CO 7 7 M 7 7 7 7 U & m d' T m co 0 o O s N N CO a s N CO CO n m 0) O ' N M a n , d dN N N N N N N N N N N N N N L�) CO- CO- M M 11 N p 0�j 0 O 7 CCI5 W 7 J !- rL 2 co 0 O a N CL W n m LO m CO N CO 0) N 7 O 0) 0) O 00077 71_ T CO CO LO 01 0 0 n O N n m a 0) a0 n CO 0) O NCO N m '- 6 n m6 N6 Ln m o m o 06 0 o r- U) .- M co o O CO n m m N Sr a CO N 0 0) m n m O O O o 0 0 oo O 0 O O 0) 6 O) 0) N N N N N N N N N N N N N N N N N N N a y 1 L L CO G Z — co N O O M O Ln O m a N 0 N m CO N N N (N N N _ O O a O M O U] m n O N m 0) LO N O) m M O n a CL a N a U] m N a m m U) 0 m m 0 o o .- N C) M a 6 a N m m n N- n m N n n a s a LO Ln N N N N N 6 LU CO N m a) 0) 0) 0) 0) W 0) 0) 0) 0 m CO 0) 0) 0) O) 0) CO 0) 0) 0) on co- GD CD CD m m OD [O aD m m m m co- co- co- co- U) U) CO- CO- CO a O ..0 7 0 o CO o LO O m a N O N CO M N N N N N N _ 7 7 a a m a n a 0) O a0) N CO 0) m M O n a m 0 0 n Q) O O 0) N a O m a a a Ln CO n n CO Q) 6 C) N co a U) CD CD LO 0 a s CO M M M M M M M M M M el- 0 O O 0 0 O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 rn rn rn rn rn rn O) o Of d) rn rn 0) 0) 0) 0) 0) 0) CO. 0 CD- 0) g LO m CD CO CD a Sr a a a N CO m m m m COCOODCOCO CO N a 0) m CO 0) 0) m 0) 0 N CO CO CO CO CO CO m CD m CD CD U) V N N O n n n n n n U) U) U] U] LO LO LO Ln Ln Ln 6 Z co co m co co N- N- n n n n N- n N- n n N- N- N- N- N- N N N N N N N NNNN N NJ N NOIN NNNNN N E _ 0 R = m •N Q Ln Ln 0 a 0 a .7 a a m .S0 0 0 0 0 0 0 0 o 0 o , q CD CO N a 7 LO N N LO U) CO o m m m CO m CO m m m CD N a 0) 0) n a co a a a a N6 0) O) O)O ) O) m O) O) O) O) W Q N- n n n m Q) L") W O) 0) 0) M 0) COCO OIm m m m m m m m m a a v ca al �m N: c F' C) N CU CI =_ W 0 R L L d a V F, V O ? m co M M N L N L r2 N Z d d j, 4 N C) CO 00 ' 0 m 7 0 0 0 0) 00 0 a) O O O O 0 0 0 0 0 O O W Ln O 0 F O M LO O O O CO 0 0 0) R O O O O O O O O O T m .0 a O M 0 0 a N O O O m J o O a O 0 66 0 0 0 0 O O N , aO O I O 0) N o O O a ciO O O op op oto o O C. 2 co co V a a LO U) m n CO CO 0) 0 O 7 N CO a Ln m n CO 0) 3 CO 0 o F o 0 0 0 o o r 0- 0 0 0 t o 7- r 7- 7- 7- 7- 7- 7- 7 7- LO C .. mt. = N d U) N to cD o a o) c m E Q « CI N d m N U a m 3 3 0 a • • IN y O Vr_ V- n V-. v, v W o , n n m COo el co 00000 n 0 0 0 0 0 -o MN#14 O O o O o o O o O 3 ta m :�� R o Oo H h O N N N u, In O O O 00000 a CL O CO CO M M M O O O 003700 Sc C.) O O triO O O O 6 O O O O O O Q Z Q y N N • Jam) C Y Y_ O o O co 8 CLa a) dm r N N l0 N _ 3 3 (0 D7 ('C CO n n O COCO N O n O O O Q 0) M n N 0 V CO N N N co t0 CO O V V U) .c- N O M O U) MNU) O 4U co co co V N O) NV coas a u-) V CO N N O O O o CO n nMCO CO 0) O0CO CA 0) C) W 00CO- CO CO- 00 - -2) 3 tl _ OM M M M M M CO CO CO CO CO CO CO CO CO O CO CD (0 CO CO CO O CD N O (O- O O a) MM C c) W > > 1- 2 w OD n O tO 03 CO LO U) CO CO n O COO CO O tD V NCD (O O V 0) O O U) N O (O n N O a0 M d) V 4) CJ 5) co V If) CO O (O n n n CO UD O 0) O 0 O) L0 Ln (U (U N U) (O tD U) U) tD N (0 tO CO- 2 O E eD COCOCO- COCO CO CO0 CO COCOCOOO t t ¢' SC CO 0 O O CD CO CD CD o CD CO c co r N CA 0) 0) 0) C0 CO 0 O 0) CD 0) 0) 0) 0) a) 2 O •3-• N 1D U) (O lD N U) (D N N) N ID N to O6 O K Z I ,D N LO y M n N t) O is- C COj d 3 O O CA CO V M W CO N M CO O M = _N 1.-: C V M (O N (O O N N r 0) c- M V O O O g w N UD N n O V O O N t1] n 0 () 7 oJa 0 a) 0 a 1 N O O n- CO lO N- t0 co O O U a) — K U) co N- co 0) O) CO o 0 N v) V_ V_ T :30 r Z ,cq ri CO- CO COi CO- (� T o o n 0 co O O N 0 CI Z N 0 W 7 ',i O t0 O atc ai O 1 C it W (. N 0 CC M M N N V V N 0) CO (D CO O CO CO 0) CO OM) N CO d) N oi V M n ,- CO N CO CO 1 COCO COV0 0) 0) 0) 4) O O W UD CO CO '.. CO 0) CO CO CO W m c i V m a) r- O CO N O CO N O) V O) V O N CO. (D N CO n M DD N O V CO O N a Nn O ON n O V n O O N N M N- n M O) N- N CO O 1n U1 a) m V) O C) d) O) CO CO CO h- 03- n n CO CO )17 CO % W <0 CO- <0 a0 a0 CO- a0 0UD <0 CO- a0 CO- CO- N a 7 d E a< z O M NO CO N M CO V 0) V O (D N O CO CO n N (0 0) V CO CO V O N- M n N CO O UD N U) W N CO U) V M N O) O tD ,- N- (D O V C)) M CO O O O 0) 03 0) 0) O OD CO n CO CO CD 0 D) o) 0) COCO- CO- CO CO OD 03- CO CO CO CO zN CO V OD •- CO O CO N- N- n N- n n N- CD Ul CO N 0 O 0) CO CO UD UD CO UD UO N N )f) N N N V V V V V V V V N QO N- n n n N- n n n n n N- n N- n 3 N N N N N N N N N NNNNN - E r V 0) a • c.--._, O O O V V m V Q N co (D 9 L W N coM6 E a) 3 co- co- N CO O O (O O N0 O V a V V V V V V > 0 co O CO f O O V V V V V v V Q O) )A .- N- V N O V N V V V V V V CO O O O NN . N NNNNN 03 U)• CO N- C r O -- N m t n '- 1A Q O d ai a) 0 R a N yO.„ N O) n L L d d F F To co t0 m 3 to N N- = D m M co M CC, o L UO 22 Z 0 d -) -) -) O) (C O O o O O) (C O O = o O O O o O C) coo O o DO) (floc.' a o O O O o co O T V J o O O O V J o N 0) O O O O O - N Q m 0 o 0 o O 0 o N- a 0 0 0 0 0 0 a 2 a) O N M M v V_ N O n O 0) 0) 4 a ;; to Q y .c4 S .- a- 2 - N .- o 8 LO O c .. m • 0 3 co co to F G• ro 0 a a c co c O Q «) m m d R oN (� a m33 o a 0 co 0 • ® h ���W a R-'i m \u' o __i o 0 g3C h 0 Ex ag U O Z U N. N a N N Y Y O N 0 CC CL a 2 a m Y N N O N 7 7 Z lQ V V 7 Q LO 10 y U M CO E Lo ©© g a Ca M M 7 C Iii F W Ci V ii C O N L a N Q' a d C ni c C O 9 V V N aO G0.= - C C C S)) P.. O w m U q O U d y 1x Ca N co IX O 0 0 0 t H J @ z U) O ',.. _a— o 0 a) ce aa)) I a LU c CC CD O CL N J a. m al cnCU Cl_ a, E co z a 'C NN 7 '77' F NONH ' H (� 1 O N N a co N c m a O N U lL ❑ W N U 7 0 CQ O C7 co co 2 U IXU N F- m O 0 `— N CD 2 H H a H 7 UH 0 N H H O H a m U) r 0) COUN H 2 H W a O_ U co co H a co o 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 o 0 0 0 0 0 O 0 0 0 0 O O v v a v v v v v a v v v a ? V V V V a R v v v v a v v v c a V v Q R L O V O V N. N N n N. O If) N. l!) C. O V C) - N U) U) C) a- O N C) t(] I- O N O C) YY Y) C) O O N. st CD )O 1f) C CD N V C) CD CD O 00 C) 0) O) N CD U) CD C) CO C) C) CD O CQD I E p,N O N CD O co CO ID I- N C) N U) N- V C) CO 0 CD I() CD V 0 C) 0 U) V h 0 V a- CO CO ; CI a (O U >. ▪ CO N. CD V V m CD a- O a- N. CD O 0) O CO O CD CO (D V C) C') N QO CD V N CD CO U) V V CO E C) m co (0 N l0 L O V CO (D C) V (O (D LO LO N W CO N O ,- N CO C) V O C O O) V CO N O O O O a O 0 C) CD Ci C) Ci (0 (D N. V CO O N V 1f) (0 (D N Y'i C) (D V M C) C N V N CD N (0 L d d 7 O V CO V N. 0) O C) C) O CO C) CD V CO V V CD a- CO O C) C) O V N CD N. W .0 V O O O N W V N (D N 0) N ID I. a- a- N Y] (D V a- 0) N N. N n N C) CO V (D V CO co co o CO CO O 2 D] co M co R Q O O CO O CO Lo- w z a a =1 -, Z Q R O C UVC) C .. `pi G CO 0 O. V 0 C m • d 7 E o m mcv ciay33a LL • H W 1110 CO i o 0 g_ 0) 0) a a 0 U O Z U N N a N N O x °r) O m m O U a) m J Y a) N J J Z @ LO U ce9a0 °0 E u, • �Ud � 4) M M J E 5 = F- Gi O d t N N a a) CN i7 O () U C N C N C V 94 1, (-)• y d w t d u o ar r 2 )6 > o J F 2 Z a) o O Q a) a) a) a CO 0 � Q U N N N N Na) y N /0 .0 m m `- N >�> u) C7 > umi U > co a O cOi >, 'm 2 C7 I- U) J 0) N U) m D m > CL H D a CO o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 v a a V v V V a a v v V a v v U) C) N u) N O U) O N- O U) N N M N at (0 CO e N- (O CO W V- U) N O (q CO CD V' CO CD r, co O 00 In 0) CO U) 00 cr M a0 N- N a0 O. N a0 U) a0 CO Ni-- ‹a a U >. E m N- 0 M C) N CO V a0 N CD CA C U) O O M N C C CO M CD ` `- V n O o 1P) O C` C V Co?, N CO N m CD O CD O) O U) U) CO N V N- < 2 d a s U) N CO O O M N- aD CD M M M . SO 'r - CO (0 CO h O N- r — O CO CO N e- a0 N O 2m C') CO) M U) 0) V' M W a0 N 0 CO N 7 0 CD O N- V Z d d I co C .. E a . a rn Eo « m m t) a cr) 0 • • 1111 II W To- 33 m' `NNW o 0 to sz U 0) a a U O Z U N. n N N O Y Y O CC m m a a E a m _ = m2. N V a U Q 0 ro m E Lo M = o CO CO 3C ❑ > > 1 w ui C..) .a c0 m .c • m K d C m c c m u ie 13- c c () d w 'I 0 : 15, & r m a > - o 0 m J• I- 2 Z N O 0 0 N 0 0 0 0 0 li 0 0 0 2 2 ❑ 0 2 2 2 N ISI O 07 m 7 m CD O m co) co N ✓ m to M W m C m O W 7 7 - 7 co N CL O O (N N ? n m 4- W LO N• m a N 0 o m 7 W 7 r _ •r N a0 7 co N Cm0 ry O r r p 4- N m O m O m O a O °) O O1 O m O m O O m U- 11 a F O F Q H = H L I- "m0 F O H Q H H Q m L N L L 7 O 7 7 L 7 L M L N L COO L m ZD 0 N 0 N 0 M O M N O m m m C M 0 m m V O C O U co C) U3 O co 0 U) Lm') 0 - Lf) 0) N O co co 6 CD up a £ O 7 J M J O 0 N 0 r- O J 0) 0 to 0 O J J N r m N m ❑ 7 O I- O N ❑ ❑ CO O N ❑ W ❑ O 7 C) ta E r r r r r r C r C r r r C C C C C r r C m m C m m m m m m CO m m m m m m m m m m m m m ❑ 4 U U) U U) Ln Ln Ln to U) U) U) Ln Ln U U) U) U) U) U U u) I- O O N Ln N O 7 CD N. LO CO O N- CO 0) CO 7 O CO CD CO O O N CO m O CO CO 1� co N N- O N m O I- CO N 4- O O O L17 7m N.: N t` O 7 N m m N6 7 O M N 9 m cN M O L',7) 2 7 m N m N Ln O mN7 mn0) O 7 '' y1Il = i 7 i i N N N Lh ? 1- 2 + I to C 0 0 VTo 0 0 CD CONI C41 el CO7 CO 7 N m CON0) m LO N- W CO Lci, CI CO 70 CO CO. r r O O O m6 m 1: 7 LA m 6 7 m m M m m m M r N 7 7 mN Ln O Ln LC) CO Ln O CD 7 Ln N CO J U) ^. Ln O U) M M N N O O C) 0) 03 co Z N N N N N N N N N N L + 0 m O O N- 0) O 7 CO 0) CO O O 7 O O O O M O N O 7 7 m m I,- O 7 CO I,- 7 7 I,. 7 7 7 7 CO CO 4- ry 7 To Z m m m o if] Nm m O D) 6 7 O O 7 O m m Lf) co V (CC 71'.- O N N 7 7 M D 7 O M M O m m 7 M 7 LA ON M ''t �- y 7 m O W 7 O m O m 1!] m m O O O O m m m Q ; 0 �, N CO 7 N CO m CO m CO Cr) 0) 01 0) CO CO CO m U >, lc CIS CD m r N 'm 'p 7 7 C C O O O O O O o O O m O O CO CD m CD 0) W 0) CD CD Lp �p �p 7 7 7 7 7 7 7 W Ln Ln O m M [n m m m N m < 0 a a s .0 m m m m m m m M C) Ln Ln Ln m N 7 m 7 7 7 N -c13 -) o 0 0 7 h' 5' O O N N U, U) Ln N O N m m m 0) 7 . I- O O 2 m M co co N d 7 7 m O ,- 0) 7 7 m Ln L'',-, m m Lt) m O m M 7 0) Z a a N 0 "' _ _ N M 7 m f� W W m 4) O O N N N Z c C a 40, 0 > 0 c Ln c .. p 0 Q- m° a = a v E O d 4' y m m N 00a` v) 33ci. 0 • 0 by North America - ALASKA - BP Prudhoe Bay PB J Pad J-30 J-30 Plan J-30 Plan 7 Anticollision Summary Report 03 June, 2014 r' u BAKER HUGHES 0 0 • BP Fait' 0 bp Anticollision Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-30 Project: Prudhoe Bay TVD Reference: J-30 @ 85.40usft(Parker 272) Reference Site: PB J Pad MD Reference: J-30 @ 85.40usft(Parker 272) Site Error: 0.00usft North Reference: True Reference Well: J-30 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore J-30 Plan Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: J-30 Plan 7 Offset TVD Reference: Offset Datum Reference J-30 Plan 7 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Interpolation Method: MD Interval 25.O0usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,485.46usft Error Surface: Elliptical Conic Survey Tool Program Date 6/3/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 47.10 1,200.00 J-30 Plan 7(J-30 Plan) GYD-GC-SS Gyrodata gyro single shots 1,200.00 2,717.00 J-30 Plan 7(J-30 Plan) MWD MWD-Standard 1,200.00 2,717.00 J-30 Plan 7(J-30 Plan) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 2,717.00 3,917.00 J-30 Plan 7(J-30 Plan) MWD MWD-Standard 2,717.00 9,568.00 J-30 Plan 7(J-30 Plan) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 9,568.00 11,795.00 J-30 Plan 7(J-30 Plan) MWD MWD-Standard 9,568.00 12,901.04 J-30 Plan 7(J-30 Plan) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 6/3/2014 8:50:33AM Page 2 of 5 COMPASS 5000.1 Build 61 • • _ BP Mitt 0 bp Anticollision Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-30 Project: Prudhoe Bay TVD Reference: J-30 @ 85.40usft(Parker 272) Reference Site: PB J Pad MD Reference: J-30 @ 85.40usft(Parker 272) Site Error: 0.00usft North Reference: True Reference Well: J-30 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore J-30 Plan Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: J-30 Plan 7 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB H Pad H-27-H-27A-H-27A 9,750.00 12,823.00 1,093.17 193.67 931.99 Pass-Major Risk PB J Pad J-01-J-01-J-01 903.88 875.00 25.74 16.95 8.81 Pass-Major Risk J-01-J-01 A-J-01 A 908.49 900.00 25.80 17.00 8.81 Pass-Major Risk J-01-J-01 B-J-01 B 908.49 900.00 25.80 17.00 8.81 Pass-Major Risk J-01-J-01 B-Plan#7 908.49 900.00 25.80 17.00 8.81 Pass-Major Risk J-02-J-02-J-02 650.03 625.00 303.26 10.91 292.35 Pass-Major Risk J-02-J-02A-J-02A 650.03 625.00 303.26 10.91 292.35 Pass-Major Risk J-02-J-02B-J-02B 644.36 625.00 303.15 10.97 292.18 Pass-Major Risk J-02-J-02BPB1-J-02BPB1 644.36 625.00 303.15 10.97 292.18 Pass-Major Risk J-03-J-03-J-03 701.50 675.00 81.81 13.35 68.46 Pass-Major Risk J-04-J-04-J-04 1,147.83 1,125.00 227.30 216.69 11.65 Pass-Major Risk J-05-J-05-J-05 1,229.70 1,200.00 102.71 19.17 83.54 Pass-Major Risk J-05-J-05A-J-05A 1,229.70 1,200.00 102.71 19.17 83.54 Pass-Major Risk J-05-J-05APB1-J-05APB1 1,229.70 1,200.00 102.71 19.17 83.54 Pass-Major Risk J-05-J-05B-J-05B 1,222.25 1,200.00 102.60 19.22 83.38 Pass-Major Risk J-05-J-05C-J-05C 1,222.54 1,200.00 102.76 19.01 83.75 Pass-Major Risk J-05-J-05CL1-J-05CL1 1,222.54 1,200.00 102.76 19.01 83.75 Pass-Major Risk J-08-J-08-J-08 3,972.08 4,125.00 571.85 76.00 495.94 Pass-Major Risk J-08-J-O8PB1-J-08PB1 3,972.08 4,125.00 571.85 76.00 495.94 Pass-Major Risk J-09-J-09-J-09 10,553.84 9,825.00 261.67 55.48 261.22 Pass-Minor 1/200 J-09-J-09A-J-09A 9,273.97 8,800.00 354.46 230.66 204.20 Pass-Major Risk J-09-J-09B-J-09B 9,273.97 8,800.00 354.46 230.73 204.13 Pass-Major Risk J-09-J-09BPB1-J-09BPB1 9,273.97 8,800.00 354.46 230.91 203.95 Pass-Major Risk J-11-J-11-J-11 3,632.80 3,850.00 371.34 93.88 284.62 Pass-Major Risk J-11-J-11 A-J-11 A 3,630.12 3,850.00 370.97 93.65 284.60 Pass-Major Risk J-11-J-11APB1-J-11APB1 3,630.12 3,850.00 370.97 93.65 284.60 Pass-Major Risk J-14-J-14-J-14 3,488.49 3,500.00 495.47 116.00 393.91 Pass-Major Risk J-14-J-14A-J-14A 3,488.49 3,500.00 495.47 116.00 393.91 Pass-Major Risk J-15-J-15-J-15 2,905.30 2,975.00 167.91 48.09 119.97 Pass-Major Risk J-15-J-15A-J-15A 2,905.30 2,975.00 167.91 48.09 119.97 Pass-Major Risk J-15-J-15B-J-15B 2,905.30 2,975.00 167.91 47.98 120.08 Pass-Major Risk J-16-J-16-J-16 3,726.31 3,800.00 228.82 53.22 177.45 Pass-Major Risk J-16-J-16A-J-16A 3,726.31 3,800.00 228.82 53.22 177.45 Pass-Major Risk J-16-J-16B-J-16B 3,726.31 3,800.00 228.82 53.22 177.45 Pass-Major Risk J-16-J-16BPB1-J-16BPB1 3,726.31 3,800.00 228.82 53.33 177.34 Pass-Major Risk J-17-J-17-J-17 3,494.40 3,525.00 212.00 49.02 163.44 Pass-Major Risk J-17-J-17A-J-17A 3,494.40 3,525.00 212.00 49.02 163.44 Pass-Major Risk J-17-J-17B-J-17B 3,494.40 3,525.00 212.00 49.13 163.33 Pass-Major Risk J-17-J-17BPB1-J-17BPB1 3,494.40 3,525.00 212.00 49.13 163.33 Pass-Major Risk J-17-J-17C-J-17C 3,500.00 3,525.00 212.14 49.22 163.43 Pass-Major Risk J-17-J-17D-J-17D 3,500.00 3,525.00 212.14 49.22 163.43 Pass-Major Risk J-18-J-18-J-18 1,751.11 1,775.00 148.16 50.47 97.71 Pass-Major Risk J-18-J-18A-J-18A 1,751.11 1,775.00 148.16 50.47 97.71 Pass-Major Risk J-23-J-23-J-23 4,285.97 4,350.00 407.42 66.21 343.21 Pass-Major Risk J-23-J-23A-J-23A 4,292.19 4,350.00 407.33 66.30 343.15 Pass-Major Risk J-25-J-25-J-25 3,319.50 3,300.00 379.00 44.22 334.87 Pass-Major Risk J-25-J-25A-J-25A 3,319.50 3,300.00 379.00 44.22 334.87 Pass-Major Risk J-25-J-25A-Plan#6 3,319.53 3,300.00 379.00 44.22 334.87 Pass-Major Risk J-26-J-26-J-26 2,170.87 2,100.00 437.81 33.59 406.70 Pass-Major Risk J-27-J-27-J-27 3,300.00 3,275.00 307.39 58.53 248.92 Pass-Major Risk J-27-J-27A-J-27A 3,300.00 3,275.00 307.39 58.53 248.92 Pass-Major Risk 6/3/2014 8:50:33AM Page 3 of 5 COMPASS 5000.1 Build 61 • e BP FAILS s " . s Anticollision Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-30 Project: Prudhoe Bay TVD Reference: J-30 @ 85.40usft(Parker 272) Reference Site: PB J Pad MD Reference: J-30 @ 85.40usft(Parker 272) Site Error: 0.00usft North Reference: True Reference Well: J-30 Survey Calculation Method: Minimum Curvature Well Error: 0.O0usft Output errors are at 1.00 sigma Reference Wellbore J-30 Plan Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: J-30 Plan 7 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design 9 (usft) (usft) (usft) (usft) PB J Pad J-27-J-27B-J-27B 3,300.00 3,275.00 307.39 58.63 248.81 Pass-Major Risk J-28-J-28-J-28 2,761.99 2,725.00 263.08 38.62 225.64 Pass-Major Risk J-29-J-29-J-29 2,700.36 2,675.00 464.58 39.14 427.33 Pass-Major Risk J-29-J-29-Plan#9d J-29 approved 2,723.35 2,700.00 459.67 40.47 420.65 Pass-Major Risk JX-02-JX-02-JX-02 4,155.31 4,100.00 91.25 62.59 30.56 Pass-Major Risk JX-02-JX-02A-JX-02A 4,140.70 4,075.00 91.16 62.30 30.28 Pass-Major Risk JX-02-JX-02PB1-JX-02PB1 4,155.31 4,100.00 91.25 62.70 30.45 Pass-Major Risk PB N Pad N-04A-N-04A-N-04A Out of range N-07-N-07-N-07 12,888.97 10,400.00 622.48 64.24 614.22 Pass-Minor 1/200 N-07-N-07A-N-07A Out of range N-20-N-20A-N-20A 12,264.59 12,585.00 884.86 456.83 454.24 Pass-Major Risk PB Q Pad Q-04-Q-04A-Q-04A 9,916.65 10,870.00 550.68 198.92 398.58 Pass-Major Risk 6/3/2014 8:50:33AM Page 4 of 5 COMPASS 5000.1 Build 61 s)"' Anticollision Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-30 Project: Prudhoe Bay TVD Reference: J-30 @ 85 40usft(Parker 272) Reference Site: PB J Pad MD Reference: J-30©85 40usft(Parker 272) Site Error: 0.00usft North Reference: True Reference Well: J-30 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore J-30 Plan Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: J-30 Plan 7 Offset TVD Reference: Offset Datum Reference Depths are relative to J-30©85.40usft(Parker 272) Coordinates are relative to:J-30 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927(Exact solution),Alaska Zone 04 Central Meridian is 150°0'0.00 W° Grid Convergence at Surface is.1.09° Ladder Plot „ I 1600- - I I I lith C J 4411. 4PL 'I i 4,. 111.11i- I I 1200- r ���f� I -q 4 i tilt , ' As ‘ I' illir , ,...,, f,..t : AV ..„. ., _ , 0 foriipu,;, . *: - - °) 800- i,„ • ? 1e01 I �I I I rYp i sMd I i` `� , i 44 CD y s , Q 400 '. `, '�' ' 7011P1 a If r F .e - .1,...„;,1 , � NII I \y! 7tj_I s .'M ` I 9 c 'LEG ND I • 0_ ""''H-77 H-274,H-27j4 V2 .1-09.l-09RPR1 .l-3PRPR1 Vrl .1-23.1-234.1-23 V4 J-01,J-01,J-01 I J-11,J-11,J-11 J-25,J-25,J J X00 5�uf� q �qbO .1 At 15000 J-01,J-01A,J-01A V1 JM12 SUr �Uep l(2500 uSft/in) J-25,J-25A,J-25A V2 -9- J-01,J-01B,J-01BV7 J-11,J-11APB1,J-11APB1 V1 -e- J-25,J-25A,Plan#6 V3 ^^ ,F01,,F31t3,F'lan#TV4 J-14,J-14,J-14Vb J-26,J-10,J-Z6 VI J-02,J-02,J-02 V13 J-14,J-14A,J-14A V2 -X- J-27,J-27,J-27 V1 - J-02,J-02A,J-02AV12 -a-. J-15,J-15,J-15 V3 -0- J-27,J-27A,J-27AV3 -XE• J-02,J-02B,J-02BV5 -A- J-15,J-15A,J-15AV1 -rj}- J-27,J-27B,J-27BV0 J-02,J-02BPB1,J-02BPB1 V4 J-15,J-15B,J-15BV2 -9- J-28,J-28,J-28 V1 J-03,J-03,J-03V1 -XX^- J-16,J-16,J-16V5 -9- J-29,J-29,J-29V0 J-04,J-04,J-04 V1 J-16,J-16A,J-16AV2 -e- J-29,J-29,Plan#9dJ-29approvedVO $ J-05,J-05,J-05 V16 $- J-16,J-16B,J-16BVO JX-02,JX-02,JX-02 V1 -A- J-05,J-05A,J-05A V7 -e- J-16,J-16BPB1,J-16BPB1VO JX-02,JX-02A,JX-02A V1 J-05,J-05APB1,J-05APB1 V11 -9- J-17,J-17,J-17 V5 JX-02,JX-02PB1,JX-02PB1 V0 J-05,J-05B,J-05B V14 -E- J-17,J-17A,J-17A V5 -b- N-04A,N-04A,N-04A V1 6/3/2014 8:50::33AM Page 5 of 5 COMPASS 5000,1 Build 61 ■all _� oomm mil 1—,i,, ,T , W n O O O < MIBM M MT N rn 8Q`��' O O O of taVCN co ��N'�.N�23 2c rnui� n _ T g (n lggA V O , Q 0 IOen0010"'0"'pp f' N T LL LL LLmu_D 15 u_15 ll- �LL �LLLL N SZ . FE L�Mt�Lnrnt�'-a~ o'er ou�Og N V R Lcr.m LN L MO i� �000000 ¢ o"'c,ooci e..v6 vi L.omm 0o'-of oo cc<c?c F f 4 it ' -C7 Z }9NC0 p V m,pN p�V cnE8m Np 20 pv7 r Q > ....... z m m m m m m m m m A m m m m A p 1 §r. o000 <cn cn co cn CD cn9ncn(/)V)cn rn cn V)CO Cr)CI)WWI- yyy o ii ii p000000000moommmTmmmm�O O ss sr a a a s CD rn h O OD C, CD NCO 1 Vl c nnnn n nn OOOOOOmOOmmMOD L4 �T W cODc R V nY- >. ___ _.: I §r ° a=��g7e791 FiER2,'EC CR4?m,,,4 m 0,rn m rn op 3E. 8i a-O C • .-.Q d a d d d 2 da ---NM V' n mmmmOO.-.-NNN pp pQ 0 0 0 0 0 0 0 pp pp �._. �. -.._ � ` 8M �����»� On p V c(nO T On CD COv T COm<V n,V�p�p M(D 2g o6 0 vt �mmm0r!'l�(V r �0C �rll�l7 O _ it N�� o N N M V O t"7[O'J O 0. _ I O o 0 o co pp��pp yrl�l yrl�l ccOO ccOO OO OO OO emp��pp r M F. ; or�r�on O2� 0,A V Y'1T000000 cO OIOI REF.:3mm 0 0 n mY N N $o���to W O r -z �E-E-�;2nm 1 v`r _ N R O p _-- _—- -_- -. pd r.2 IF. � E o ggg4iNY s00 N N wor go"@.)E I rim - 1 _ - `i 0 F yyMO . 8 t o - _.. o N f cl -� i 8 F I 0 0 ' s N Z i_ y ` o A o o y g o o g - q '.; D 111. "iO N r r N N N N - .�. _. V PPP 62E g (U!/�3sn OOZ) +)u ol�I/(-)u�nos F F do rl. ,1- Lu 3,- F w0 O^ _07 t 119 m a f • _ 0 _ - ffi J C • T 3 d -� ODSII SII _ ' 112. •'2PS1 _N Na rn I JP aI •S0 - o 0m ' CA 0- ' - OOSO ' o C I N_ I - I N O O ryO % fNDe o,CF G. S'. ii OF . x -.o oN la mcd cn�.Op� � rr�� 0 ,i' Y j000RCOGONRN�NNCO'I V'OpON OTnT _- ._. .. O b � .. - _.F _ •.+✓ m M m r0 .. .-- L 4 �.-NNN NN MM�� R `� D'i'1q 0000 o mornomoomos oMo o , F N ` GG = 2m 88 8":oomoONpmovo o N r aa.442 : LLc000EioNoari67ddNocouio•40 `< v "° I- ..n uz rn N o , GG .. .. .. v of p y3a51 i a .,'° m Ooccnomononoo-oop Mouloo - -.. o .N _, �5. 000(SE O<0000 V 00�oMON OMOO E-,o. - ■ d1O'1 j PJM pGOC(.l�O(VOMGMCCaOO m0t.7O co cCO F-' - G O N °O J 000 ..0N 8pg�{8�O3 n o09=a n Mm�l V <OM —R .-7 .. R - ., n Q . 000 N Mc00 OCCS.nM N0Or(Jc00, c..9.-o , , G - E H W W OOC N4 z;F.;O�lI'I:tV IAC N mr�yC ON(O-1 N 05'W 'l Q ' III: O Or�op (Zn000tONcNpMN �Om Nm NNNN M - +— o + NR V � O,ImOD �m OT _1 O 1 III m p gisO_ �y p , a y OOO�m mn V rppfll 0g NNNN� N G . CO H OOOMMR��1�ulmmMmmn OT al s p0 ER FE! Mmm N Ns ' MSO I.._..■I O - ��■' .yup iom CD ca c-v 0 CD OD m OD CO CD rn of m CCg_' _ ■■N■1 V ONN nt,T ,CD ccO T O��O�pD OM V To-T m O h v-CV CO O up T to OD m CO O Cn 00 m CO oD O N _.. pro Q00000000000 a00 SOO TT�Qr(O<D�OR S N ZO 00 O 000 YJ YOnn 3. -}- CLO b 0 0 0 O O O O O N N N N N N N O 7,!.. N I P T O inn mmmm ��m`�i�n nnn n - ��ggg 8�rn rn�c4io� 1 3a COpO pO mO)Op'i pm pm cp�cp7NNNR�Vp OSI Owl OrnO 00�N� - N (y]' r� 0 �O pOpVpRV V OR V R RV X40'1 LL0'I 23 CR TTTTN tmO C� 4 O 8. f>/1 8V1 .7 U '.,F Fes. w,_ L �ROONN 4ml Ti)�ONt�On TmO�i OVQ'�ci,,7..: O p O O O O `D p - `�� �Qj `Q� pU i '- N cl ,.„--,------...m,O n TOiTO N1O �� N '1T (�l,8: 1 r'1,J rn 1 �D o 8 & 1 0 e-N Ms r0 m n m Ol O-N Ms 0 m n m m N N N {UI/TJsn OO7/ `pdoU lE.7I�.Ian anti imli 06, 5 /11/1111ELEIpr a W'r"i Inl,. I ■ice. ■ _ I N I Pi 7111 7411 , 0 4 .,, cv. 1 ,,,, r r �. gaoa r °it .1��� ' , r s >o� - �� a ■■■ iv E ,, I c Mil NIKE, ����W !!I' g\ 001 ■ `o ► • - g z IJrj I O :I` 1 q \h �OSG- - Li �. 1 i ' IN 010: � - U N �� �� ,, °pos s Ft • IOW® _ 1CI Y2 ■moi ' 1- ',• 1 .r I.: ce a _ :: IU1II1 ( ,, 100 ° o , S ,! ... .....r, � q 111111 ■ I O � r i; IF4 JI° 1 � ■■ ■■ , ■ i No, - air ,_ , _ 1 1 ler 11111 1 0 S. I t 1l I ' ■I ai.r PM_"� a oo .■ ■ill ■ ■ I �' i � ��■■ ■■ ■c ■/■ ■■■■■�■ '11:11E-ro,',!0°841/rr'!' ; s s I IIIialE111111=1 1)1 ■ . 111111111.1111iI.- ''' ' v litt c' 5'' 8 Y N N N N (ui/8sn OSI) (+)q.ioj(-)4;nos, • 0 i . I > � - spm si ' gagz m g e $ i ' 5 ># u 5 m ; e a 35 i; ' q,$>1;i> m _ _i$g 4055. ><�s >a3>am s3R3>s>a>a >Z><m>;ax <1a m $m a �8imin x1' " g'So ,5� ��oM12 oo'72F F N �1�� mmep"3am oo�o°00000ba 04 . sa aaii.5 " 3mRS n g $41 "iiF /sai a/E/�a3� %%� .mie qry 9,; ; ;; 1 sooaF"o7o`o'oamomomaITo a 3 _. ,000�oeS �NS�S�eo�Srv�o - -- w o o V7A e $ it -wt..... _ N co8gaxeom2m O .. ."-,w.�e~ 'Ail . S3s3p NF7,,mi mmmmmmmmo ;e406:1-1-1,,,_*--..:*,,. r � i1e'IR1,./4 0 c - '" g:tggm�rvvorinnry ' i /y �Ytiil♦!/ e< e N NNNN ", 2 A `i`4�a}Tr.t °lis L RAH <SSSaaS�mSSSS / / /¢ _ A -.wg�drtal an s/ 1 1 \ (6 @ s w "0000mmmm ooNNN^<^vmmoo'2NN // a ''�.\0114111ktir i t Q WOST Se ee«o,EncE minmm No ',....a--..z-•k-. A\‘‘, .N A\Ali® " � I 11 �' 5 IA so oEll <N.- 'j ri��\ \ „* # \r fn s s s oo W � �mm Q � «< N<eN mmm o.-�NNN � 1�1��1� Zyvv��1N �- v - � _ g Nme-w-m NN I�lllVONv � ,t 11IWnI c F, W p 4:�,IW 1�': /f"'1r, O.2 u) O N O, N O2Log V V. O8 a0 U c \ 4# p U O C 8 0 0 0 N \ \ - \ - __ a U . oNo � ooNo / kit o E voo v $ vB �o 2 - No � - Z Loc. o com - _ 8 Oa N _c 800 m, oNocm m 'p m 02 D 4 T m Q , m ' __-` � \ .\may _, �a Ua p , 0:170-74EVi iiri -� a, a 4^ ' Zy ' , o' m� o �� +-rr',:�ligit. tip : -' O //� � / ;Z-"im, +!OfttiA P --.r N / / ,4 / tt , ,0�il / . i Aka.,AftgeligestoarAm...P."--„Iv; / % ` Fes i 10 f 3ch ch a m F2 8 F2 0 0 0 - Q o r a O m + + A C�.Oj O �'. Ol I� to N ,��0� f y G rc ._ , _ .� 8 0 EE LT❑LT IMP t4•n n% °� l /' i I � es ' 0 0�3�3 2 co , \ \\'`\ __.N -- \ii,\SOO it tOttitVISONFI' (C13 u: 3 as 8 +_ klitN\.., _., w44 St+4 4, ,,,,,,t *-8 2 ( > i c aaaaaaa ol 2m \ \� a co,000000 .0 \ \ E w o0 0 No I PO iI P/iftk 'I E ¢ o t0ro`m`mmmm L v 1• .N v O �aaaaaaa 0 c \` =, E N H000000. Za \\� V y Qor,nm�n.- o� omo O NNNtO•f O�i�N 0.-'' -4111rair-41b E00.000.2;00000.000000 O LL V oon-r-1812 o IIS $ .-.-N N T m - J_ 6 0 -- 9, O +o N Ii o MINE _ � ; m a _ lia W tt sa s<m mg4 e' >sy a n;q _ = s o . , m sg`g ■ r r rr r z9aca5 . > _ '$m'1$ _._ ,._m>3� a___ _cc„,>,j,,,?'mryc,, zz,12 Itlioo em �Q N _ gg - : i i m s q 2 ry «� �N rv���<SQ t9aa4�'UMIllifiM$11$ ' '<S�S! $>> -,>> :!,00,1.AI apex% gpzgp2bqp§7 o o f. 4 4 ' g,g A l 1 1,1 1,9,1 1 1 9,1 ffi i i 1i 9,1 i 1 1 9 K K s 3/Yi �° o aapo ry eqo e , . . 4 4 4 4 e 4 } 4 r e . 1 44 p000'ri0onionon'oomammono0o00 3000,�n�gm mnmrvnou',,ponmN Ro � I I ❑ ooanW�„,4 mgmgry o 8 z _ 73 h Zoo Nvavam 1181-gv,oromommmm= \ +' + "',T,:""r1A` l''T .411111*4%re irfArlarl. '-', epS9n o mo o<q SFS di I �►/ 3 C �g, "elnUatiglEilnlai �/�_� La a z €22 foo 2EPa NN$mMrv'��rv'HrvUM Ara/ Iry. ' � _cao E ¢ Es sy 000m88m aa888223 m oS& r��/i � �_ (0 € , m ee rpt / N e 5 E v o!! I NSS /ss s I- NPv' / \ \swIm .rv��o n u ) � � Co c N N ,- O U O •- N N.-..C) NI...v V U) N U o O / a) \ 7 /NuOON8co2 to O _ / N F O OcN M m O \ - / / P, 4)) \ Nu ? c O r° n 8 8 N "' \ / / 0 a E o ,_ N M O O \ \ / / Z i C o-d3 - _- o_ vo mN � � 1- I .748m N NC m to W Y 0 7,,‘-o y a L7/ _-,°-. 3.74401111, iyt() —% '4 N Z X8 a' O N ost p d1``���4 �4 A/hA/�(lktp' NCD yC N c o<< De�'t ��yi'r.moi 4,41111ry'N'e�Ftiliu Q Q of 19 ! Ln J vE ! �® p ak1°IILSki\\ r 0 o m I '� ,� �e olid .� \moi,a 4 ®®A 'ri��it!�i v0ryli�4�°���a \mow i C_t �i A rated�ib.°Yfgi ro \p W `'s. ' A yx> Rod, ...,fh.. vt�ce F , \ baa .; , Q �� �rl �� � Cyt 14j V o4t�rf¢��i�i�N�.up�■4 �0 �'�a ��I�MMr, ^gig�m it;� � .�' . i°414 11 1.�10 l4, i`t��� e��o ?ers.n..in o O r o 11 - o`a.>�;s ,�d� � �1 4 +�i '� AVIV �br•....r N 1.i •i�y 1�"°= *V0 40 10 t!i-liq atWak a ALs,�g4,44. .° ip �./fi���%�I°► °AS1�1'�i�_ 6 F'li r- en�sg' 8!►\�t3`i9,,r`v ,iiaO°�i�w.vV .- \ � v,,,,,/Ni , * ik, ,, t..): ‘ • 14140.-01 ‘_Ad_k.t,t,.$0.N.A.....r.2,97,-,--- \ \ \ ���a - ami . I 1 li,00,..46.141pApAr..7"..... \ \ \ C 0 0 0 N y O O O , !1.1# /6 *al N. y N fn 2 0 100 0 o 4 ;�R�53'%, �, � I d � �� 0 ir _ CD aa_ ) vtiittigs v H�� .4 U v«'.3 a'a �8 •n�11`� �� -, °QA m.i h�4i > o ;� 0, 42, - 1 X14144`` /` \ �'Si j[•q�ji:sr e ,1 fie d /��' ,�4���. o EC a Cpt�wWatiM�� 1 0 aaaaaaa Pi S. '700141,1\ - '•®3' wq >• o c • . . 2222222 Welt*. - r 4.00'y,.i�"`a-rR. y N N M aaaaaaa 7►a;� �•.�� i - _ -, -. 4• �""°t�y m t Z n roi coi M n n M N X OR m iDl -4.-_, / j� W� �rA! C o 0 0 0 0 o v � 4 r'& ,e .' - +mac ®'t sD -'- a 'IyC ~0000000 _� X aC -+w0y X Q onnr°o n� S X O NVi \ '''' ..11041604111.74.t.:4/1R ` �y . � O O�N N n Oji'N_ 4a _ __Ste: --.4.4 1. a ,', iw. ',. �o X '�a4s� � ` � �IyO. N na r'r'NNrnrn ' _ 9' 0 2 c N • • • I c; I I v ( 1 TPAD I, '. I I 1 LEGEND NOTES: I 1 ° " R PAD M AS-BUILT CONDUCTOR 1. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD27. `4- " _ I -- - } �_I 2. BASIS OF LOCATION IS J PAD MONUMENTS J-1. 1 • EXISTING CONDUCTOR 3. BASIS OF ELEVATION IS J PAD PLANT MONUMENTS. 4. ELEVATIONS ARE BP MEAN SEA LEVEL DATUM. 1 I 5. GEODETIC POSITIONS ARE NAD27. I 1 6. PAD MEAN SCALE FACTOR IS: 0.9999232 PROJECT i 7. DATE OF SURVEY: MARCH 19, 2014. IA I `4_, ' 8. REFERENCE FIELD BOOK: NS14-10 PGS. 45-49. - - J PAD 1 Ixtt��i��salr,i N PAD CC2A 1 I 7,1. I 444 "C�°OF A(,/1,-. I r Q, °°° •°°sem ♦ I i .: moo° ,.�� °°9 ♦� SURVEYOR'S CERTIFICATE _ —• t g 1h 1\ {r I HEREBY CERTIFY THAT I AM 7- 11 4 , )1,4A 0 PAD- rk + PROPERLY REGISTERED AND LICENSED :j : : ::. TO PRACTICE LAND SURVEYING IN GC2 r (THE STATE OF ALASKA AND THAT THIS AS-BUILT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT VICINITY MAP F. Allison : : SUPERVISION AND THAT ALL N.T.S. °° ICI1fIF� ° DIMENSIONS AND OTHER DETAILS ARE ���` s e° ,608 11 •°°°.°�� CORRECT AS OF MARCH 19, 2014. - FSS I ONN :12 . co NI to ■10 Z 0 ■24 .a ■191 J 5■ ■11 ■22 ■21 14 15 2916252617272618 J-30 ■6 . . I. . . . . . — N - 3■ •7 ■12 X2■2■ •13 0 ■8 11. ■23 ■20 a9 GRAPHIC SCALE 0 150 300 600 — -- I 1 ( IN FEET ) 1 inch =300 ft. _„ - 1 J-PAD LOCATED WITHIN PROTRACTED SECTION 9, T. 11 N., R. 13 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) BOX ELEV. OFFSETS Y=5,970,565.29 N= 2299.03 70'19'37.504" 70.3270843' 4,500' FSL J-30 X= 643,106.00 E= 1999.95 148'50'21.883" 148.8394118' 38'3' 1.246' FEL DRANK: J. WOLF ; rs,. CHECKED: - hi AROLLAWAY ' by ogre3/20/14ORA R81WOJ FR801 SHEET: SOH NO. WOA J—PAD SCALE AS-BUILT CONDUCTOR LOCATION 00 3/20/14 ISSUED FOR INFORMATION + 1" = 300' WELL J-30 1 of 1 NO. DATE REVISION NY CNN _,_...I - ■�IfHUIJON/ j 0 • oLi 4 -o I— a Z -------- _. _ C3 �- }—. j, f—!Ja--- 1 1 I -._—___� — 4 =*' ' 1 I CO _' }--e i t ___ w�-o0 0 11 c� O TAA N 't NAA. N N Ca ;1 ` N 0 —111 • 1111 • 11111111 ■ ■ ■ ■ ■ ■ ■ 1 ^�^ ,-ct w 1 1 I LI I I r II .,�I I I I I I 11 I _ 111 t I e- 1 1 11 _A ` ! o —. N W I 1. Q CNL I r,.. p■ ■ 4 a ■ L o � ,t f6 NTu i °. i I t, I------ --_ , 1 _'1 —1 I 1 CO b II • ( ti I f I i I t`r- NA— i, i I 1 I �..—_� 1 Li! 11 I i -I I i 1 _. — -- - _ Q f cC N ■ tt I GO 1 1 �■ tI '- N■ I I1 1 tt 1 (■ c^1 I I I'-t Ntil ■ I ? D' N I (N 1 SLI■ 1 l ( o I I .. I I o M 1 i 'n■ I w I X I l H d I- 1 I 1 1 v■ Ij 1 1 w 1 4 1. - Y • o 1 1" ' i 0 I " I1 z 1 11 1-41 .0617 O U 1 I 1 'I 0 � O I I ' IZ Z 0 i Parker 272 BOPE Schematic PARKER 272 BOP STACK RAM TYPE BOP: DUTCH LOCK DOWN FLANGE SHAFFER LXT DOUBLE BOP 13 5/8"-5M 13 5/8"-5M STUDDED TOP d 41 13 5/8"-5M FLANGED BOTTOM c' W/(2) 14" UL2 OPERATOR, UPPER CAVITY `�7 ° ANNULAR BOP: AND (2) 14" PSLK W/BSTR OPERATOR, SEA MI,tri R9l ,,,__-- SHAFFER LXT 13 5/8"-5M 13-5/ LOWER CAVITY 13-5/8" 5M STUDDED TOP a 13-5/8" 5M FLANGED BOTTOM 0 1 I DRILLING CROSS: I I 13 5/8"-5M FLANGED TOP 1 ... 1 13 5/8"-5M FLANGED BOTTOM 71-$ ;'a1 Q W 3 W(2) 3 1/8"-5M SIDE OUTLETS E� ....,,,. 41 11 ° ' 11 II --� T 1 'bb4�� KILL LINE: \� 1_ � ,� 2-1/16" 5M FLEX HOSE I, 11yc�q „ 6 --1 t. !►■�.�t■ >ti �, 2-1/16' 5M X 3 1/8" SM D.S.A. ,T ;I�1"4 '0"' ._r.l J Yl` .'���MI*`••At _ ��- � 3-1/8" SM FLANGED MANUAL GATE VALVE �f, I __ • r - 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE ........__,I 1 I CHOKE LINE: RAM TYPE BOP: 3-1/8" 5M FLANGED MANUAL GATE VALVE _ SHAFFER LXT SINGLE 13 5/8"5M 8" 5M F1ANCED HYDRAULIC GATE VALVE 13 5/B" 5M STUDDED TOP 3-f / 13 5/8"- 5M FLANGED BOTTOM 3-1/8" 5M FLEX HOSE w/(2) 14" UL2 OPERATOR • • • { r 77 T —a 1/16-5000 1:x-39) jMONITOR PORT + ,; ". �-TEST PORT .- 10 LOCKDOWN SCREWS SCSSV EXIT T—I1-5000 CR-54) v n - ry ; E ,, ill v 1. I ^., I + `-2 I/16-5000 MOD 120 GV 2 1/16-5000 MOO 120 Gv � TEST PORT _�gg1 7'1'..--,,M" i ', • 10 LOCKOOWN SCREWS . ,141, . `7 !# "i- i' I I-5000 CR-54) it �� ir,: F .1 � -t :0. 014z...'1, 1 ' t 0, • 41-.11-;,-- Ail p _..L.;..„- • i . 7 i p., I lit tz.�• : fr $p'. �" - t 2 1/16-5000 MOO 120 CV :=, I_ TEST PORT 0 � i .� f �Q 'i1111 ) TEST PORT 1 i i t I j ' il [. i 1,+ 120'00 CASING 9 2/8' 00 CASING I I 7.00 CASING i co 4 1/2' 00 TUBING Q) ILO IC 3P GKpEL.OG3!Q7DOO Ni QAI G- SICAD GNC . co PROPOSAL '02-5037Q (ULTRA -SELOMO-001L-E PRODUCERS ERS Sn GHJEC4OG22. RE 00120M107apt3 00000M1022404Ic..) PRIVATE A)O COWIGENTtA: WASS OT./RAISE SPEC+E:Eo AEv12100,5 lOES_RInTION •d• • 'm••"'•m'w•••'��"7.1 e.oONOT%ACETIPS aAAfRc TOEERANCE 1 ULTRA-SL IMHOLE N...at �N asosatwG.oea .n.R.c......2.m.to a OR OI.SPUN.E AIS[0i MOTES NT Z OY2O 0i'4� �,o.,a..,..�.....,.,,�w.-_tiw�.e i,ea.ESNu+.mas.o+sN.x+.w x '•oma ' 1 PRODUCERS OR INJECTORS I i IQ mowrovwnr+N omr..a ate« a.NS.OE COIAEA ANN .Ow NAZIYU. xz !AIS { 4.0 I.c.E.n+ I ,ii°•wt�^'YY S,TaEAOS TO CONK .TO TED.ST O. ..x :.005 3 + WELLHEAD SYSTEM N.AO{,EZ OS-20-02 0 .,KNs..mST ee,..Y.me.R..I.1. O TAKAOO Torre O TO casae.TO API w+ } II-5000 X 4 !/!6-5000 Tri f06.Y v..■wuw N.m....:cos..,.. T.ORANINOS IN TNWO oca PROJECTIONS ANCLE—:S0• EEaANO 03-20-02 VR...[.o ',...."=',„:"."',„,.,'".... w ....ow�..... 0.Au.m.. c KAT.2-Cs..us,STRNOLE zs• 20 x o5/8 x 7 x 4%2 0oi20M1030698 t .m.R..o vew r.Nr wV..w.•Nc 1 COWON ipiEJdINE %IM2N- 0/ tEaANo .07.20.02 • S Note Dimensional information reflected on this drawing are estimated measurements only. 28.63" — Est. 1 ■� ■ rte,_ n� O 00 OO' 4-1/16" 5,000#-- Q 0 93.38" — j •• Est. lel Iii � I 4-1/16" 5,000# U \ 50.75 Mg um Est. Un m 00 \ #71r_ o` 4-1/16" 5,000#---- \O 0 w I., BP Alaska SK-011583-03 e CAMERON Name Jeanette ��4-1-05 �o��a Piesssr # J-6816-3 • • OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. • S TRANSMITTAL LETTER CHECKLIST WELL NAME: -?.alp- 1- 3-o PTD: /NOBS v Development _Service _Exploratory ^Stratigraphic Test _Non-Conventional FIELD: -a L47 POOL: �t�v VW� �y1 �Liko Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI LATERAL The permit is for a new wellbore segment of existing well Permit (If last two digits No. , API No. 50- - - - in API number are Production should continue to be reported as a function of the original between 60-69) API number stated above. In accordance with 20 MC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name Pilot Hole ( PH) and API number (50- - - - ) from records, data and logs acquired for well(name on permit). The permit is approved subject to full compliance with 20 MC 25.055. Approval to produce / inject is contingent upon issuance of a Spacing Exception conservation order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10'sample intervals through target zones. Please note the following special condition of this permit: Production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 MC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application,the following well logs are Well Logging also required for this well: Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, /composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 4/2014 6 • LI❑ N aa)) o N N a) a U) o '-N a) of 3 v13 : Q �; of E: aa a 0. a a) : M: a cc 3 0 O c w : o w <° Ln, o g 3: o �: N o w o: o o. a: ami w -c o a v7 1E a 'n0 coCD : 2 45 0 c o. 0 : o 0 0 3 Q as O ° a $ 3: a o p ao�i o -_ 20_ M m 3 v 2, c, O . c m : 0)LLL o, o Q - o_, . w - a a 0Lco CD a o H -a 0 a a) o co: 4 Q o - 0 0 2 3 .(o Mo o: w N c a a co. E V Co o _c E o: a m. O 0 O: > > 4 0) c a) 2 r >" �: : : N �: 0 0 6 3 o X o' V O' H co: co i of �' co p O C U 0: N. Z. O: N o: E: E: N.. H Z O .a 0 @, O. a) N• oZ • CO D o o m a cu m a) _ v) N O) c0: O a CO W c D. H N: � a. N - a) X� �, c in, E m m, o Co . a)a) a) O a. 0 a a) co a) o E o w N: `t N C E oo N' c, '3 y. �� a). �: : °' -] E 2 co Q 0 c 0) 4 p.ai `p CO ID03as. n a CO Z o w m o m - N c'co c, 2' •c c' 3: C M i, a C0 2 N y co s- m C.9 CO o Ow U 0 3 0 co co): Co, o I c: 'o E: a' p Z o -' 0 v Co U. co: 3 �: a o. a E. a 0 CD p' O� D D: co V c 't W U' -a.. L: 3: X: u) U' co N• a y' Z. 0 m Ct 0 0 a) 0 ] r' O, O. O C: p. co: d, N' a), 0 x c, w Q a a O 0 0 <n N' H' a f: Q: U 2� I saw: O: I w 0 I Q aa) aa) a): aa)) aa) a: aa)) aa: aa)) a: aa: a. Q Q Q Q a a: a 0: a0). N a: Q, a); CO; Cl), CO: aa; a a), CO: a: Q, o, aa); Q, Q; Q, a z >- >- >- >- >- >- >- >- >- >- >- >- z z z z r >->-, Z >- >- }; Z; >- >- >-, >- }, >- >- >- z, z }, z, z, z 1 T H o : N w CO N a 0 0 N a c6 m. .c E: 3 - E o o U 0 c a): a) a c O o c)7 T 0 3 a c o d E Lo it o ,: = T 0 0 c 3 E 3 0 0 y: U O, a). M,. U c' c' E: 0 Jo: Z w. 0 N E. a �\ O O w as j '�: O o: N ° d f6: ° N 2 h o T w c' J 0 o) N: f0 -: a c t6 0 2 0 m y o j t �: E a > a`r E o m o 0 0 ca o O m U = rn U �, ;n m a 3. ,, o N c 0) . °�: c coo' 7' 0 o LCA a < U) N a)' m o� 1 w Z -O 0 c. .a o. a, E 'o f0 a) a D O `. 0: m: 0' o 0) a)' N d' N c c N cL- o0` N 4 O Q E E _ c c E m', a o M c c u) a: F .. c °co 0_ 2 0 c. a) u- c. a); L 0 °' N cca a c o 0 a`) 0 0 a) c c c ° - o in o o' Q °c m c v U' aa) c° c a ° o Q m v3): I-o o: cn a aYr a v_i Q N a) O 0 0 w a 03 ' o y O O' O E' N f0 - >, a) . cC _1 E n U U o -r _0 O O o c a) io: - m a. o: c o ., E' 7' 3 a) o' 5 _c m 3 �, as a E a Q c c as c, o _c L n as co z: N -a 0 c o N. m o: c) 4 ° x 0. 3 0 0: -- 3. c E a) c a �s :o co n a -a v E a) co: co co ° .5 2: ° a) o: �: c o o z o_ -o c h 'm a) •o a), .3 .3 > a) a) °• a v 'o 0 3, - c: m oo y: 44 .a 5: a: o: 3, o, CO., Z - w O o O a o m •a o o co o ate) ate) o COE' �' o ° o Y aa) ° o' °' V' E' a f0' E _c o ami' a w' co c a co _ °6 I- .c Q a) a a N - a) 0. N. N. Q s `7 N.. U 0) a. s: 4; - c, rn m N N o) �. c °U 3 2 .a: 2 a N: co .c -o cc ° a) E a) O. O. N a) co a. y, N (0 0' N c a 7' @ N co N .6 o: '0 c: .a 'N' a a) 0 :° 'Cu c of >+ a a) a) 0 3 c .a: o) c a o• t) C c' o = a .a @ o cz) o 0' o (C) > 0.) IL J @ .0 - 'a 'o -a 0. ' c a3 .o .0 .0 -a.. - a). in '6. N: N: > .2) (0 L N N VA - U ° d C (0 C E. .� X. a). E N o. a) a) m. .� o c c a •• a� 0. c o c@i' .o 7 °' co ai o: '7� ° co c o V: T. c a) c: co CO j w c 3 co)' 3 co' E m `° `° 0 0 - 3 co o >c o 0 o o, �' m: V a) r vi 0- E 3 0 -E ° o ° -o: Cr-" d a) a) o' O 0 . (` N c,1 0' N:. 0 7 0 > > .3 C2) 7 �: a a): o) W, W. a) 0 a' • 0- • a: �6� hi _ J CO aa) a) .c a) a) a) a o a a 0) m CO 0 3 2 o 0 3 M' M' 2 CO o a) -o `D c O. O c; ° a a' a€)' (C) a a()) o 0m U@w _iDss5co O0 a a c..) 5' ¢ aZ 0u") C) 00vQ Q `; o m c; C.) 5: � 2 a; p co co c� "`—o- W a 0 N CoV Lo O Co O O N M V CO C- CO O O N Co V U) C° N- Co a) V Z E s- N co d• Lo CO N- co 6) r `- m r r r r cn N N N N N N N N N N Co Co Co Co co Co Co Co co co I- VI v y 0) O r O ,a) 0 U c O c CO N QS N a) N o IX LC) O p to a) 0 Ln 0 y W v a) ° c m °a. o.E /per' J N N a) a) O o c c "`�00 W Q I.- a .a) C > d a s ` V > a Q Q w a O a