Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
214-103
7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU G-01B Pull Patch Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 214-103 50-029-20214-02-00 11953 Conductor Surface Intermediate Liner Liner 9013 80 2664 8134 1777 2490 9458 20" x 30" 13-3/8" 9-5/8" 7" 2-3/8" 8633 39 - 119 38 - 2702 36 - 8170 7727 - 9504 9455 - 11945 39 - 119 38 - 2701 36 - 7420 7037 - 8669 8631 - 9013 None 2670 4760 7020 11780 9458, 10130 4930 6870 8160 11200 9280 - 11909 3-1/2" 9.2# L-80 34 - 9504 8480 - 9013 Structural No Tubing Packer N/A N/A Torin Roschinger Operations Manager Finn Oestgaard finn.oestgaard@hilcorp.com 907-564-5026 PRUDHOE BAY, Prudhoe Oil Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028280, 0028304 34 - 8669 N/A N/A 207 98 20598 8813 19 6 1350 900 800 200 N/A 13b. Pools active after work:Prudhoe Oil No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 7:47 am, Sep 17, 2025 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2025.09.16 16:09:01 - 08'00' Torin Roschinger (4662) RBDMS JSB 092525 J.Lau 11/6/25 ACTIVITY DATE SUMMARY 8/25/2025 ***WELL S/I ON ARRIVAL*** RAN 2-3/8" BRUSH & 1.75" CENTRALIZER TO R NIPPLE @ 9,458' MD SET 1.781" RX @9,458' MD ***CONTINUE ON 8/26/25*** 8/26/2025 ***CONTINUE FROM 8/25/25*** ATTEMPT TO PULL 1.781" RX PLUG @ 9,458' MD (6 HOURS JARRING) ***CONTINUE 8/27/25*** 8/27/2025 ***CONTINUE FROM 8/26/25*** PULLED NS UPPER PATCH ASSEMBLY @ 9,271' MD (MISSING 1 ELEMENT) MADE 1 ATTEMPT TO FISH MISSING ELEMENT W/OUT SUCCESS PULLED LOWER ANCHOR FROM 9,307' MD SET 2.70" x 58" CATCHER ON LINER TOP PACKER @ 9,447' MD SET 2.75" X-LOCK W/ 2.72" RMX BODY AS A FLOW THROUGH SUB IN SVLN @ 2,170' MD RAN CHECKSET TO 2,170' MD. FLOW THROUGH SUB FELL DOWNHOLE WHILE SHEARING CHECKSET RECOVERED & RESET FLOWTHROUGH SUB @ 2,170' MD RAN CHECKSET TO 2,170' MD. SHEARED ***WELL LEFT S/I ON DEPARTURE*** Daily Report of Well Operations PBU G-01B 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU G-01B Ext Add Perfs w CTU Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 214-103 50-029-20214-02-00 11953 Conductor Surface Intermediate Liner Liner 9013 80 2664 8134 1777 2490 10130 20" x 30" 13-3/8" 9-5/8" 7" 2-3/8" 9008 39 - 119 38 - 2702 36 - 8170 7727 - 9504 9455 - 11945 39 - 119 38 - 2701 36 - 7420 7037 - 8669 8631 - 9013 None 2670 4760 7020 11780 10130 4930 6870 8160 11200 9280 - 11909 3-1/2" 9.2# L-80 34 - 9504 8480 - 9013 Structural No Tubing Packer N/A N/A Torin Roschinger Operations Manager Kirsty Glasheen kirsty.glasheen@hilcorp.com 907-564-5258 PRUDHOE BAY, Prudhoe Oil Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028280, 0028304 34 - 8669 N/A N/A 199 443 25862 16795 15 29 600 1400 750 250 324-174 13b. Pools active after work:Prudhoe Oil No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 2:49 pm, Apr 22, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2024.04.22 14:18:44 -08'00' Torin Roschinger (4662) RBDMS JSB 042324 DSR-4/23/24WCB 7-15-2024 ACTIVITY DATE SUMMARY 4/16/2024 LRS CTU #1, 1.5" Blue Coil. Job Objective: Set CIBP and Extended Adperf MIRU. Install NS CTC and bump up test against brass. Make up and RIH with 1.75" DJN drift assembly. L&K the tubing with 130 BBL's of 1% KCL. RIH and drift to 10300'. POOH and make up 1-11/16" HES GR/CCL logging toolstring. Log from 10300' to 9150' at 50 FPM. Paint an orange tie-in flag at 10100'. POOH and confirm good data (+3' correction). Make up NS setting tool and 2-3/8" CIBP. RIH and re-load the well with 130 BBL's of 1% KCL. Set the plug at 10130'. PT the plug to ~ 1000 psi (0.08 BPM LLR). POOH pumping 60/40 down the CTB. Lay down NS setting tool. Perform well control kick while tripping drill. Deploy 168' of 1.56" guns (156' loaded, Titan charges, 6 SPF, 60 degree phase). Start RIH. ***Job in Progress*** 4/17/2024 LRS CTU #1, 1.5" Blue Coil. Job Objective: Set CIBP and Extended Adperf Continue RIH with 168' of 1.56" guns (156' loaded, Titan charges, 6 SPF, 60 degree phase). Corrected depth at CIBP and perforated 9957 - 10113 per BKR RPM 10-06- 2014, (9960 - 10116 pre reference log). POOH pumping pipe displacement + .25bpm. At surface flow check and lay down guns on minimal losses. Well freeze protected with 22 bbl of 60/40. Pad operator notified of well status. RDMO. ***Job Complete*** Daily Report of Well Operations PBU G-01B gg Make up NS setting tool and 2-3/8" CIBP. RIH and re-load g( ) g the well with 130 BBL's of 1% KCL. Set the plug at 10130'. CIBP and adperfs are correctly shown on new WBS, below. -WCB g(g g Corrected depth at CIBP and perforated 9957 - 10113 per BKR RPM 10-06-) 2014, (9960 - 10116 pre reference log). 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in this pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd? Yes No Subsequent Form Required: Approved By: Date: APPROVED BY THE AOGCCCOMMISSIONER PBU G-01B Ext Add Perfs w CTU Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 214-103 50-029-20214-02-00 341J ADL 0028280, 0028304 11953 Conductor Surface Intermediate Liner Liner 9013 80 2664 8134 1777 2490 11910 20" x 30" 13-3/8" 9-5/8" 7" 2-3/8" 9014 39 - 119 38 - 2702 36 - 8170 7727 - 9504 9455 - 11945 2370 39 - 119 38 - 2701 36 - 7420 7037 - 8669 8631 - 9013 None 2670 4760 7020 11780 None 4930 6870 8160 11200 9280 - 11909 3-1/2" 9.2# L-80 34 - 95048480 - 9013 Structural No Tubing Packer No SSSV Installed Date: Torin Roschinger Operations Manager Kirsty Glasheen kirsty.glasheen@hilcorp.com 907-564-5258 PRUDHOE BAY 4/4/2024 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2024.03.21 06:41:41 -08'00' Torin Roschinger (4662) By Grace Christianson at 8:25 am, Mar 21, 2024 MGR25MAR24 DSR-3/21/24A.Dewhurst 22MAR24 10-404 JLC 3/26/2024 CIBP & Ext AdPerf Well: G-01B Well Name:G-01B API Number:50-029-20214-02 Current Status:Operable SI Cycle Off Pad:G-Pad Estimated Start Date:04/04/2024 Rig:CTU Reg. Approval Reqd?10-403 & 10-404 Date Reg. Approval Recvd: Regulatory Contact:Abbie Barker Permit to Drill Number:2141030 First Call Engineer:Kirsty Glasheen Contact:907-350-4310 Current Bottom Hole Pressure:3250 psi average area pressure MPSP:2370 psi (BHP - .1psi/ft gas gradient) Max Dev:96 deg At 11,350 MD Min ID:1.781 ID 2-3/8 R nipple at 9,458 MD Brief Well Summary: G-01B was a 2014 CTST into the Ivishak targeting Zone 1B. An IA cement squeeze was performed prior to the CTD sidetrack to provide a cement production packer above the kickoff window and to cover badly corroded L- 80 tubing. The Sag was perforated in 2023 to access rich gas. After the Sag was added, no appreciable change in rate was seen. The well slowly increased in GOR, so a patch was set across the Sag to ensure we werent being gassed out from the Sag. The wells performance has not improved since the patch was set, so we would like to set a plug to isolate the Z1B perfs and perforate in the landing of the well. The well has one GLM available for kick off, so no N2 lift is planned for this well as the base case. In the event we can not kick off the well, we will have coil return for the N2 lift. Objective: The purpose of this procedure is to isolate current perforations and perforate uphole to increase rate and lower the well's TGOR. Procedure: Coil (Requires 1.5 CT): Notes: Remote gas monitoring for H2S and LELs are required for Open Hole Deployment Operations Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS coverage is required. The well will be killed and monitored before making up the initial perf guns. This is generally done during the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. 1. MIRU 1.5 CTU 2. After MU MHA and pull testing the CTC, tag-up on the CT stripper to ensure BHA cannot pull through the brass upon POOH with guns. 3. RIH with GR/CCL & 1.8 nozzle to ~10,200. PUH and paint flag for plug/perfs depths. 4. POOH. 5. Bullhead ~130 bbls 1% KCL/SW down tubing. Max tubing pressure 2500 psi. (This step can be performed any timebefore setting CIBP andprior to open-hole deployment of the perf guns. Timing of the well kill is at the discretion of the WSS.) a. Wellbore volume to top perf = 85 bbls b. 3-1/2 Tubing = 82 bbls c. 2-3/8 Liner = 10 bbl CIBP & Ext AdPerf Well: G-01B 6. MU 2-3/8 CIBP. RIH and set at ~10,130 MD (adjust depth as needed to avoid collars). PT to 1000 psi to confirm good set. POOH. If PT does not pass, it could either be LTP, patch, or CIBP that is leaking. Call OE to discuss best way to diagnose this. We may decide to move forward with perfs and troubleshoot plug/LTP later. If the patch is leaking, we do not care as we do not think the Sag ever contributed appreciably. 7. Prepare for deployment of TCP guns. 8. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/KWF, 8.4 ppg 1% KCl or 8.5 ppg as needed. Maintain hole fill taking returns to tank until lubricator connection is re-established. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. 9. *Perform drill by picking up safety joint with TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. a. At the beginning of each job, the crossover/safety joint must be physically MU to the perf guns one time to confirm the threads are compatible. 10.Break lubricator connection at QTS and begin makeup of TCP guns per schedule below. Constantly monitor fluid rates pumped in and fluid returns out of the well. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. Perf Schedule *1.56 guns were used to estimate gun weight for this job (5 ppf) *Tie-In Log: Baker RPM 10/06/2014. This log is -3 off depth from the reference log. Perfs on tie-in log are 9955-10111 MD. Perfs on the reference log are 9958-10114 MD. Run #1 Perf Interval Perf Length Gun Length Weight of Gun (lbs) 9955-10111 MD 156 156780 lbs 11. RIH with perf gun and tie-in to coil flag correlation, consider tagging the CIBP if there is any discrepancy with depths. Pickup and perforate interval per Perf Schedule above. a. Note any tubing pressure change in WSR. 12. After perforating, PUH to top of liner or into tubing tail to ensure debris doesnt fall in on the guns and stick the BHA. Confirm well is dead and re-kill if necessary before pulling to surface. 13. Pump pipe displacement while POOH. Stop at surface to reconfirm well is dead. Kill well if necessary. Attempt to minimize fluid pumped during this step to enable easier kick off. 14. Review well control steps and Standing Orders with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 15. Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun BHA. 16. RIH and circulate diesel from LTP to surface (~82 bbls) taking returns up the back side to enable and easier kick off. 17. RDMO. Make up PCE. -mgr CIBP & Ext AdPerf Well: G-01B Attachments: Current Wellbore Schematic Proposed Wellbore Schematic BOP Schematic Standing Orders Equipment Layout Diagram Tie in Log Sundry Change Form CIBP & Ext AdPerf Well: G-01B Figure 1: Current Schematic CIBP & Ext AdPerf Well: G-01B Figure 2: Proposed Schematic CIBP & Ext AdPerf Well: G-01B Figure 3: BOP Schematic CIBP & Ext AdPerf Well: G-01B Figure 4: Extended Perforating Standing Orders CIBP & Ext AdPerf Well: G-01B Figure 5: Extended Perforating Equipment Layout CIBP & Ext AdPerf Well: G-01B Figure 6: Tie-In Log Header CIBP & Ext AdPerf Well: G-01B Figure 7: Perf Tie-In Perf 9,955- 10,111 MD CIBP & Ext AdPerf Well: G-01B Figure 8: CIBP Tie-In CIBP ~10,130 MD Hi l c o r p N o r t h S l o p e , L L C Hi l c o r p N o r t h S l o p e , L L C Ch a n g e s t o A p p r o v e d W o r k O v e r S u n d r y P r o c e d u r e Da t e : M a r c h 2 0 , 2 0 2 4 Su b j e c t : C h a n g e s t o A p p r o v e d S u n d r y P r o c e d u r e f o r W e l l G - 0 1 B Su n d r y # : An y m o d i f i c a t i o n s t o a n a p p r o v e d s u n d r y w i l l b e d o c u m e n t e d a n d a p p r o v e d b e l o w . C h a n g e s t o a n a p p r o v e d s u n d r y w i l l b e c o m m u n i c a t e d t o t h e AO G C C b y t h e w o r k o v e r ( W O ) f i r s t c a l l e n g i n e e r . A O G C C w r i t t e n a p p r o v a l o f t h e c h a n g e i s r e q u i r e d b e f o r e i m p l e m e n t i n g t h e c h a n g e . St e p P a g e D a t e P r o c e d u r e C h a n g e HN S P r e p a r e d By ( I n i t i a l s ) HN S Ap p r o v e d By ( I n i t i a l s ) AO G C C W r i t t e n Ap p r o v a l R e c e i v e d (P e r s o n a n d D a t e ) Ap p r o v a l : As s e t T e a m O p e r a t i o n s M a n a g e r D a t e Pr e p a r e d : Fi r s t C a l l O p e r a t i o n s E n g i n e e r D a t e 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU G-01B Patch Perforations Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 214-103 50-029-20214-02-00 11953 Conductor Surface Intermediate Liner Liner 9013 80 2664 8134 1777 2490 11910 20" x 30" 13-3/8" 9-5/8" 7" 2-3/8" 9014 39 - 119 38 - 2702 36 - 8170 7727 - 9504 9455 - 11945 39 - 119 38 - 2701 36 - 7420 7037 - 8669 8631 - 9013 None 2670 4760 7020 11780 None 4930 6870 8160 11200 9280 - 11909 3-1/2" 9.2# L-80 34 - 9504 8480 - 9013 Structural No Tubing Packer None None Torin Roschinger Area Operations Manager Michael Hibbert Michael.Hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028280, 0028304 34 - 8669 N/A N/A 267 329 28947 28462 24 24 600 650 699 720 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 11:20 am, Jun 01, 2023 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.06.01 11:03:16 -08'00' Torin Roschinger (4662) DSR-6/1/23 RBDMS JSB 071823 WCB 1-8-2024 ACTIVITY DATE SUMMARY 3/8/2023 ***WELL S/I UPON ARRIVAL*** (patch tubing/liner) DRIFT TO LTP @ 9,447' MD W/ 2.70 CENT, 30' 2.66' DMY GUN, XO, 5' 2.72 WRP DRIFT ***WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED ON WELL STATUS*** 4/10/2023 ***WELL S/I ON ARRIVAL*** (Patch tubing liner) RAN 3-1/2" BLB, 2.72" G-RING BRUSH & FLUSH TBG TO LTP @ 9,427' SLM / 9,447' MD. RAN 3-1/2" GR, 10' x 2.74" DMY WHIPSTOCK, 10' x 2-7/8" SPACER, 10' x 2-7/8" SPACER, 6' x 2.74" PACKER DRIFT (OAL = 37') TO 2,145' SLM (Patch Drfit unable to drift SSSV nip) RAN 6' x 2.74" BAKER PACKER DRIFT WORK THROUGH SSSV NIP @ 2,145' SLM / 2,170' MD RAN 3-1/2" BLB, 2.72" G-RING BRUSH SSSV NIP @ 2,145' SLM / 2,170' MD RAN 6' x 2.74" PACKER DRIFT TO LTP @ 9,427' SLM / 9,447' MD (drifted clean) RAN 3-1/2" GR, 10' x 2.74" DMY WHIPSTOCK, 10' x 2-7/8" SPACER, 10' x 2-7/8" SPACER, 6' x 2.74" PACKER DRIFT (OAL = 37') TO 2,167' SLM / 2,170' MD. (Patch Drift unable to drift SSSV nip) RAN 10' x 2.74" DMY WHIPSTOCK WORK THROUGH SSSV NIP @ 2,145' SLM / 2,170' MD, TAG LTP @ 9,427' SLM / 9,447' MD RAN 2.74" SWAGE THROUGH SSSV NIP (No issue) RAN 20'x2.74" DUMMY WHIPSTOCK TO SSSV NIP(Sd, did not fall though with minimal tapping) RAN 10'x2.70" DUMMY WHIPSTOCK, 2.74" PACKER DRIFT TO LTP AT 9,447' MD RAN 3-1/2" GR, 10' x 2.74" DMY WHIPSTOCK, 10' x 2-7/8" SPACER, 10' x 2-7/8" SPACER, 6' x 2.74" PACKER DRIFT (OAL = 37') TO 2,167' SLM / 2,170' MD. (Patch Drift able to work through inconsistently) ***CONTINUED ON 4/11/23 WSR*** 4/10/2023 Assist Slickline (BRUSH AND FLUSH) Pumped 2 bbls 60/40 meth and 82 bbls 180* crude down Tbg while SL brushed. SL in control of well per LRS departure. IA,OA=OTG 4/11/2023 ***CONTINUED FROM 4/10/23 WSR*** (Patch tubing liner) DRIFT 2 7/8" BAITSUB, 2.74" PACKER DRIFT 20'x2 7/8" SPACER, 2.72" DUMMY WRP & 2.74" SWAGE TO LTP AT 9,447' MD ***WELL S/I ON DEPARTURE*** 5/9/2023 ***WELL S/I ON ARRIVAL*** PT PCE 250LP-3000HP SET NORTHERN SOLUTION 2.72" MONOPAK LOWER ANCHOR(350-272) AT 9307' MD CCL STOP DEPTH=9293.6' MD, CCL TO ME=13.4'. LOG TIED INTO BAKER RPM DATED:06-OCT-2014 ***READY FOR SLICKLINE*** 5/28/2023 ***WELL S/I UPON ARRIVAL*** (Patch tubing/ liner) DRIFT W/ 2.74" SWAGE TO NS LOWER MONOPAK ANCHOR AT 9,307' MD STING INTO LOWER ANCHOR & SET 3-1/2" NS UPPER PATCH ASSEMBLY w/ MONOPAK PKR @ 9271' MD (ME) (38.81' oal) ***JOB COMPLETE, WELL LEFT S/I, DSO NOTIFIED*** Daily Report of Well Operations PBU G-01B SET NORTHERN SOLUTION 2.72" MONOPAK LOWER ANCHOR(350-272) AT 9307' MD STING INTO LOWER ANCHOR & SET 3-1/2" NS UPPER PATCH ASSEMBLY w/ MONOPAK PKR @ 9271' MD Operator Name:2. Development Exploratory Service 5 Permit to Drill Number:214-103 6.50-029-20214-02-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 11953 11910 9014 none none none none Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" x 30" 39 - 119 39 - 119 Surface 2664 13-3/8" 38 - 2702 38 - 2701 4930 2670 Intermediate 8134 9-5/8" 36 - 8170 36 - 7420 6870 4760 Liner 1777 7" 7727 - 9504 7037 - 8669 8160 7020 Perforation Depth: Measured depth: 9280 - 11909 feet True vertical depth:8480 - 9013 feet Tubing (size, grade, measured and true vertical depth)3-1/2" 9.2# L-80 34 - 9504 34 - 8669 Packers and SSSV (type, measured and true vertical depth) No Tubing Packer Liner 2-3/8" 9447 - 11945 8624 - 9013 11200 11780 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 83100221 026855 0 21928 273 800 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Noel Nocas Noel.Nocas@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:907-564-5278 Treatment descriptions including volumes used and final pressure: 13. Operations Manager Operations Performed1. Abandon Plug Perforations Fracture Stimulate Pull Tubing GSTOR WINJ WAG GINJ SUSP SPLUG 16. Well Status after work:Oil 5 Gas Exploratory Development 5 Stratigraphic 15. Well Class after work: Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured9013 Sundry Number or N/A if C.O. Exempt: No SSSV Installed Junk Packer Printed and Electronic Fracture Stimulation Data 5 Operations shutdown Change Approved Program Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend 5Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 028280 & 028304 PBU G-01B 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations By Samantha Carlisle at 9:02 am, Jul 31, 2020 Senior ResSenior ResReor R Digitally signed by Stan Golis DN: cn=Stan Golis, ou=Users Date: 2020.07.30 17:39:55 - 08'00' Stan Golis SFD 7/31/2020RBDMS HEW 8/3/2020 MGR31JUL2020 DSR-8/3/2020 ACTIVITYDATE SUMMARY 5/7/2020 (LRS unit 76 assist SL) Spotted Equipment, SL RIH for drift ***Continued on 05/08/20*** 5/7/2020 ***WELL S/I ON ARRIVAL***(perforating) DRIFT W/ 24' x 2.29" DMY GUN W/ 2.50" LIB, TAG AT 9443' SLM. POOH. ***CONT. ON 05/08/2020*** 5/8/2020 ***CONT. FROM 05/07/2020 WSR*** (Perforating) DRIFT W/ 24' x 2.29" DUMMY GUNS & 2.50" LIB & SAT DOWN @ 9,443' SLM (impression of ltp) RAN RCH SCMT LOG AS PER PROGRAM.(good data) ***WELL S/I ON DEPARTURE, PAD-OP NOTIFIED OF WELL STATUS*** 5/8/2020 ***Continued from 05/07/20*** (LRS unit 76 assist SL) Pumped 5 bbls 60/40 meth followed by 551 bbls 1% KCL down TBG to load well and for SL logging. FP TBG with 23 bbls crude , IA/OA =OTG FP Tag hung ,well in SLB custody upon departure . 7/17/2020 ***WELL FLOWING ON ARRIVAL*** (HES E-Line Perforating) PERFORATE 9279' - 9299' w/ 2", 6 SPF, 60 DEG PHASE HSC MAXFORCE GUN (reference log depths: 9280' - 9300'). ***JOB COMPLETE ON 17-JUL-2020*** 7/17/2020 T/I/O=2320/1090/60 Assist E-line (Perf). Load tbg with 120 bbls crude FWHPs=0/1060/50 Daily Report of Well Operations PBU G-01B Date: 5/28/2020 Transmittal Number: 93763 BPXA WELL DATA TRANSMITTAL Subsurface Information Management 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 The digital zip file for the well log package listed below is being provided to you via SharePoint. If you have any questions please contact Merion Kendall: 907-564-5216; merion.kendall@bp.com. SW Name Log Date Company Description Format G-01B 5/8/2020 READ Cased Hole SCMT Zip File Please Sign and Return one copy of this transmittal to GANCPDC@bp365.onmicrosoft.com Thank you, Mer Merion Kendall SIM Specialist ----------------------------------------------------------------------------------------------- BP Exploration Alaska|900 E. Benson Blvd.|Room: 716B|Anchorage, AK ----------------------------------------------------------------------------------------------- AOGCC https://bp365.sharepoint.com/sites/BPtoAOGCCElectronicPermittingandReporting/ PTD: 2141030 E-Set: 33268 Received by the AOGCC 05/28/2020 Signed for by Abby Bell on 05/28/2020 STATE OF ALASKA- ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operatiot5 = iu Gwrk Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing❑ 'i.u,. Change Approved Program ❑ Plug for Reddll ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Change LTP 0 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work 5. Permit to Drill Number: 214-103 3. Address: P.O. Box 196612 Anchorage, Development 0 Exploratory ❑ AK 99519-6612 Stratigrephic ❑ Service ❑ 1 6. API Number. 60-029-20214-02-00 7. Property Designation (Lease Number): ADL 028280 and ADL 028304 6. Well Name and Number: PBU G-018 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Total Depth: measured 11953 feet Plugs measured None feet true vertical 9013 feet Junk measured None feet Effective Depth: measured 11910 feet Packer 36-7420 6870 4760 Liner 1777 7" 7727-9504 measured None feet true vertical 9013 feet Packet true vertical None feet Casing: Length: Size: MD: TVD: Buret: Collapse: Structural Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Conductor 80 20" x 30" 39-119 39-119 844 Subsequent to operation: Surface 2664 13-3/8" 38-2702 38-2701 4930 2670 Intermediate 8134 9-5/8" 36-8170 36-7420 6870 4760 Liner 1777 7" 7727-9504 7037-8669 8160 7020 Liner 2498 2-3/8" 9447-11945 8624-9013 11200 11780 Perforation Depth: Measured depth: 10148 - 11909 feet True vertical depth: 9008-9013 feet Tubing (size, grade, measured and true vertical depth) 3-1/2" 9.2# L-80 34-9504 34-8669 Packers and SSSV (type, measured and No Tubing Packets true vertical depth) No SSSV Installed 12. Stimulation or cement squeeze summary Intervals treated (measured): Treatment descriptions inducing volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 227 24935 0 0 844 Subsequent to operation: No Test Availble 1400 1000 14. Attachments: (regmmd ne120 nnc 25,070 25 s 25 zee) 15. Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil 0 Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: WA Authorized Name: Oshiro, Joleen Contact Name: Oshiro, Joleen Authorized Title: EG Pad Engineer/New Wells Delivery PE Contact Email: JOLEEN.OSHIROabp.com Authorized Signature: -� -�� Date: � L' I Contact Phone: +1 907 564 4606 Form 10404 ReNsed 04/2017 /W�{/p ,(O.�µ�� RBDMS UG 3 0 2019 �[ l A `I Submit On9inel Only Daily Report of Well Operations PBU G -01B 'WELL S/I UPON ARRIVAL'*' (profile mod) DRIFT W/ 10'x 2.70" DUMMY WHIPSTOCK, 2.50" LIB TO TOP OF 35 KB PACKER @ 9,432' SLM / 9442' MD (impression of clean fishing neck) PULLED 35 KB PACKER & ORIFICE INSERT FROM 9,432' SLM PULLED PTSA FROM DEPLOYMENT SLEEVE @ 9,455' MD. RAN 10'x 2.70" DUMMY WHIPSTOCK, PTSA DUMMY STINGER IN DEPLOYMENT SLEEVE @ 9,441' SLM (ring on no-go) 8/6/2019 ***CONT WSR ON 8/7/19''* ***CONT WSR FROM 8/6/19*** (profile modification) LRS LOADED IA W/ 300bbls CRUDE, LOADED TUBING W/ 140bbis CRUDE SET 35 KB W/ TOP OF LTP @ 9447' MD, NS PTSA W/ 1.781" R -NIPPLE IN DEPLOYMENT SLV, NIP @ 9458' MD (rsg installed, 11.37' oal) LRS PERFORMED PASSING 2500psi PRESSURE TEST ON LTP EQUALIZED & PULLED 1.781" RSG PLUG FROM X NIP @ 9,455' MD ***WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED OF STATUS'*' 8/7/2019 TRT17 - 4-1/16"CM IWBL'HEAD= McEVOY AL; ILA1 U1= DAntic OKB. E -EV = 61.83' RINELEl = 70.67' BF. E = 36.64' , -EV 6570 20' X 30' 119' KOP= 3206' RK RK 16 0 10/13/14 05!04/14 SQZ NSIdAT® 6 Max Angle = W@11350' Datum MD= 973V ODNDUCTOR Datum TVD= 88W SS 13-3/8" CSG, 72#, N-80 Burr, D= 12.347' 2893' Minimum ID = 1.781"@ 9468- 2,V8" R NIPPLE IN UP w! PTSA G-01 y 7"PARTIAL CHROME) NOTES: ELL ANGLE MAX DOGLEG "38° � 10000"• r 970— 3-12" OTIS XDB SSSV LAND NP, ID=2.75" 2691' I-19-5/8" D✓ PKR GAS LFT MANDRELS ST I ND I TVD I DEV TYPE DW 1 LATCHPORT 1211893 DATE 2 14377142M 1 7182 6570 37 32 MUG MMG DONE `DMY RK RK 16 0 10/13/14 05!04/14 TED TOP OF CEMENT H "5800 ` STA #1 = OMY BEHIND CEMENI TOP OF 7" LNR 7727' 7727' 9-5/8" BKR TIEBACK SLV, D = 7.50' 7734' 9-s9" X 7' BKR LTP BEHIND BHYDHGR,D=6.188" CEMENT 19-5/8' CSG. 47#. N-80 BUTT, ID = 8 681" 1--� 9174' NSOC 1-1 8755' LNR/ CMT H 9455' 3-12" WHIPSTOCK (09/14114) 3-12" TBG, 92#, L-80 TDS, .0087 bpf. D = 2.992' 7- LW 29#, 13CR-80 .0371 bpf, D=6.184" 9-5/8" MLLOUT WNDOW (G -01A) @ 8170' - 8215- 135 KB BKR LTP w/ PTSA ( 9455' 2.70" BKR DEPLOY SLV, D = 225" w WIPER PLUG BUSHING @ 9464', ID =1.78" 2-39' R NP, D =1.781" 9466' 2-3/8" BTT PUP JOINT, D= 1.995' MLLOUT WNDOW (G-018) @ 9504' - 9513' I PBTD (TAGGED 10/07114) 1 2-3/8" LNR, 4.7#, L-80 TH511, .0039 bpf, D = 1.995" DATE REV BY COMMENTS PERFORATION SUMMARY 06118#76 RIG 36 ORIGINAL COMPLETION REF LOG: BKR RPM ON 10/06/14 1211893 ANGLE ATTOP PERF: 90'@10148' 03/19/19 ADPERFS Note: Refer to Pmducdon DB tocal ertdata SPE SPF INTERVAL OP141SQZ SHOT SQZ 1.56" 6 10148 -10180 O 03103/19 1.56" 6 10368-10400 O 03103/19 1.56" 6 10400 -10464 O 03102/19 1.56" 6 10464-10528 O 03101/19 1.56" 6 10705 -11155 O 10107/14 1.56" 6 11305-11740 O 10/07/14 1.56' 6 11830-11909 O 10107114 9-5/8" MLLOUT WNDOW (G -01A) @ 8170' - 8215- 135 KB BKR LTP w/ PTSA ( 9455' 2.70" BKR DEPLOY SLV, D = 225" w WIPER PLUG BUSHING @ 9464', ID =1.78" 2-39' R NP, D =1.781" 9466' 2-3/8" BTT PUP JOINT, D= 1.995' MLLOUT WNDOW (G-018) @ 9504' - 9513' I PBTD (TAGGED 10/07114) 1 2-3/8" LNR, 4.7#, L-80 TH511, .0039 bpf, D = 1.995" DATE REV BY COMMENTS DATE COMMENTS 06118#76 RIG 36 ORIGINAL COMPLETION 02/16/16 PULLED DSSSV (0129/16) 1211893 0.14 SIDETRACK COMPLETION 03/19/19 ADPERFS 10108114 NORDIC 1 CTD SIDETRACK 0327/19 ADDED OKB, REF, BF, & COND DEPT qDDMD 0326/15 THH/PJC SET KB LTP 0821/19 PULLED LTPBETLTPvd PTSA8 RN8 0528/15 SNC/JMD RESET KB LTP 0521/15 0126/16 JMM/JMD SET DSSSV PLUG (01/19/16) TAG 11020' —2-3/8" PUP w / RA PP \ TAG PRUDHOE BAY UNIT WELL: G -01B PERMIT No: 1141030 i API No: 5"29-20214-02 SEC 12. Tl l N. R13E. 2063' FNL 6 1974 BP Exploration (Alaska) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS APR 01 2019 1. Operations Performed CC Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ OperatioAMt68((�� t. ❑ Suspend ❑ Perforate m Other Stimulate ❑ Aller Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: ❑ 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development 21 Exploratory ❑ 5. Permit to Drill Number 214-103 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-20214-02-00 7. Property Designation (Lease Number): ADL 028280 and ADL 028304 8. Well Name and Number: PBU G -01B 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY. PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 11953 feet Plugs measured None feet true vertical 9013 feet Junk measured None feet Effective Depth: measured 11910 feet Packer measuredNone feet true vertical 9013 feet Packer true vertical None feet Casing. Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" x 30" 39-119 39-119 Surface 2664 13-3/8" 38-2702 38-2701 4930 2670 Intermediate 8134 9-5/8" 36-8170 36-7420 6870 4760 Liner 1777 7" 7727-9504 7037-8669 8160 7020 Liner 2503 2-3/8" 9442-11945 8620 - 9013 11200 11780 Perforation Depth: Measured depth: 10148 - 11809 feet True vertical depth: 9008-9013 feet Tubing (size, grade, measured and true vertical depth) 3-1/2" 9.2# L-80 34-9504 34-8669 Packets and SSSV (type, measured and No Tubing Packers true vertical depth) No SSSV Installed 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 124 10155 0 0 705 Subsequent to operation: 287 25870 0 0 717 14. Attachments: tr yuimd pr 20 nnc 25,070 2s 071, a 25.2831 15. Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development p Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: oil ® Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ IGSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge- Sundry Number or N/A if C.O. Exempt: WA Authorized Name: Oshiro, Joleen Contact Name: Oshiro, Joleen Authorized Title: E Pad Engineer/New Wells Delivery PE Contact Email: JOLEEN.OSHIRO(Mbp.com 2 Authorized Signature: Date: J/%i 7 h N Contact Phone: +1 907 564 4606 Form 10-404 Revised 04/2017 V OYAO �V�R7`�7b �� ( RBDMS±APR 0 2 2019 Submit Original Only CTU#8 1.5" CT. Job Scope: Drift/ Log/ Adperf MIRU CTU. RIH w/ 1.75" Drift Nozzle. 2/28/2019 ***Continue Job on 3/1/19 WSR*** CTU#8 1.5" CT. Job Scope: Drift/ Log/ Adperf Continue RIH w/ 1.75" DJN. Tag PBTD 11903' down / 11898' up. Pooh. MU & RIH w/ HES GR/CCL BHA. Tag TD at 11904' ctm. Log fro compression up to 7050'. Flagged pipe at 10499.98'. Pooh. Receive good data (+9' Correction). Correlate to PDCL Log 13 -Oct -2014. Corrected PBTD at 11874.23'. Potential - 36' of fill. Decision to use flag instead of PBTD to correct perf guns. RIH w/ 1.56" x 32' HES Perfecta Perf Gun #1. Correct depth at flag. Perforate Interval 10496' 105 A' - Pooh. All shots fired, ball recovered. RIH w/ 1.56" x 32' HES Perfecta Perf Gun #2. Correct depth at flag. Perforate Interval 10464' - 10496' Pooh. All shots fired, ball recovered. RIH w/ 1.56" x 32' HES Perfecta Perf Gun #3. 3/1/2019 ***Continue Job on 3/2/19*** CTU#8 1.5" CT Job Scope: Drift / Log /Adperf Continue RIH w/ Perf Gun #3. Correct depth at flag. Perforate Interval 10432'- 10464'. Pooh. All shots fired, ball recovered. Stack down & change packoffs/chain inspection. Trim 25' of Coil. MU & RIH w/ HES GR/CCL BHA. Log from 10600' to 10100'. Flag Pipe at 10499.83'. Pooh. Receive good data ( +7' Correction). Correlate to PDCL Log 13 -Oct -2014. RIH w/ 1.56" x 32' HES Perfecta Perf Gun #4. Correct depth at flag. Perforate Interval 10400'- 10432' Pooh. All shots fired, ball recovered. RIH w/ 1.56 x 32' HES Perfecta PerfGun #5. 3/2/2019 ***Continue Job on 3/3/19 WSR*** CTU#8 1.5" CT Job Scope: Drift / Log /Adperf Continue RIH w/ Perf Gun #5. Correct depth at flag.. Perforate Interval 10368' - 10400'_ Pooh All shots fired, ball recovered. MU & RIH w/ 1.56" x 32' HES Perfecta Perf Gun #6. Perforate Interval 10148'- 10180'. FP well. Pooh. All shots fired, ball recovered. RDMO. 3/3/2019 ***Com tete*** THEE= 4-1/16'CNV WIELLFEAD= McEVOY ACTl14TOR= BAKER OKB. REV = 61.83' REF BEV = 70.67' BF. E -EV = 36.64' KOP= 32W Max Angle = 96' @ 11350' Datum WD= 9738' Datum TVD = 880D SS G_01 B SAL (PARTIAL CHROME) • ANGLE MAX DOGLEG: 38" @ 10000••• 20"X 30 ® 179• I 2170' —13-1/2. OTISS XD6 SSSV LAND NP, D = 2.75' INSU 133/8' CSG, 729, N-80 BUTT, D = FSTMATED TOP OF Cf3M8NT —5800 Minimum ID =1.78" @ 9464' WIPER PLUG BUSHING PRUDHOE BAY LUT VVE-L G-01 B PERMIT Nn: '2141030 AR No: 50-029-20214-02 SFC 12, T11 N, R13E, 2063' FNL & 19745 FE - TOP OF 7- LNR 7727' 7727' 9-5/8' BKR TACK SLV, D = 7.50' GAS LFT MANDF2ELS I ST MD TVD DEV TY FE DMI' LATCH PORT DATE 9442' 35 KB LTP w / ORIFICE SUB, D=1.81' 24377 TOP OF 2-3/8'LNR/WT] 9455' 4260 37 M G DONT IEC 16 10/13/14 31/2' TBG, 929, L-80 TOS, —9504 MILLOUT WINDOW (G -011B) @ 9504'-9513' IN DEPLOY SLEEVE L 1 17182165701 32 ( M G *DMY RK I 0 105/04/141 _ FSTMATED TOP OF Cf3M8NT —5800 'STA 9I=DMY BBIND CEMENT PRUDHOE BAY LUT VVE-L G-01 B PERMIT Nn: '2141030 AR No: 50-029-20214-02 SFC 12, T11 N, R13E, 2063' FNL & 19745 FE - TOP OF 7- LNR 7727' 7727' 9-5/8' BKR TACK SLV, D = 7.50' 061181`76 RG 36 ORDINAL COMPLETION 7734' 9-5/8' X T BKR LTP BEHIND 12118193 D-14 SIDETRACK COMPLETION &HYD HGR, D=6.188' CEMENT 9-5/8' CSG, 479, 19-80 BUTT, D = 8.681' 91 TV 03/27/19 DDYJMD ADDED OKB, Fff, BF, & COND DE3'TH 03/16/15 Tm PJC SET KB LTP 9-5/8' MILLOUT WINDOW (G -01A) @ 8170' - 8215' Lr 7' LNR 299, NT -80 XO 13CR-80 NSOC 8755' 9442' 35 KB LTP w / ORIFICE SUB, D=1.81' w 13 X 0.18' PORTS (05/21/15) TOP OF 2-3/8'LNR/WT] 9455' 9455' 2.70' BKR DEPLOY SLV,D=225' w/ WIPER PLUG BUSHING CO 9464', ID =1.78- 9466' 2-3/8' BTT RIP JOINT, D= 1.995' 31/2' WHPSTOCK(09/1a/t4) 9504' 31/2' TBG, 929, L-80 TOS, —9504 MILLOUT WINDOW (G -011B) @ 9504'-9513' .0087 bpf, D = 2.992' 7' LNR 299, 13CR-80 NSCC, 10118' .0371 bpf, D=6.184' PE RFORATIONSLIBTNIRY RE= LOG: BKR RPM ON 10/06/14 ANGLE AT TOP FERF: 90-@10148' Note: Fifer to Production DB historical pert data _ SIZE SPF MERVAL t OPNSOZ SHOT I _ SOZ 1.56" I 6 '101 - 10180 O 03103119 1.56" 6 O 03/03/19 1.56'I 6 1110400-10464 O 03/02/19 1.56-1 6 10464 - 105281 O 103/01/191 1.56-! 6 10705-11155 O 110/07/14 1.56" 6 11305 - 11740 O 10/07/14 1.56" 6 �8 30 - 11909 O 10/07/14_ PBTD (TAGGED 11=7114)1-1 11910- .0039 bpf, D =1.995' I2-3/8' PUP w/RA PPTAG I 11020'—2-3/8'PUP _.. w/ RA PP TAG PRUDHOE BAY LUT VVE-L G-01 B PERMIT Nn: '2141030 AR No: 50-029-20214-02 SFC 12, T11 N, R13E, 2063' FNL & 19745 FE - DATE REV BY COMMENTS DATE Fill/ BY COMVIENTS 061181`76 RG 36 ORDINAL COMPLETION 02/16/16 N-WJM0 PULL® DSSSV (01/29/16) 12118193 D-14 SIDETRACK COMPLETION 03/18/19 MR/JMD ADPHRFS 10/08/14 NORDIC 1 CTD SIDETRACK 03/27/19 DDYJMD ADDED OKB, Fff, BF, & COND DE3'TH 03/16/15 Tm PJC SET KB LTP 0S/18/15 SWCIJLVD RESET KB LTP (05121/15) BP Exploration (Alaska) 01/26/16 JMWJMD SET DSSSV PLUG (01/19/16) STATE OF ALASKA RECEIVED ,._ SKA OIL AND GAS CONSERVATION COM., SION JUN 1 7 2015 • REPORT OF SUNDRY WELL OPERATIONS (^_ 1 Operations Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubin❑ ,AQGi0�+6r Ctdown ❑ Performed Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Cask'', I .1 Change Approved Program ❑ Plug for Redrill ❑'erforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other _Pull/Set LTP 0 2 Operator 4 Well Class Before Work. 5 Permit to Drill Number Name BP Exploration(Alaska),Inc Development 0 Exploratory ❑ 214-103-0 3 Address P 0 Box 196612 Stratigraphic ❑ Service E 6.API Number Anchorage,AK 99519-6612 50-029-20214-02-00 7 Property Designation(Lease Number). 8 Well Name and Number ADL0028280 PBU G-01B 9 Logs(List logs and submit electronic and printed data per 20AAC25.071) 10 Field/Pool(s) PRUDHOE BAY,PRUDHOE OIL Ti Present Well Condition Summary. Total Depth measured 11953 feet Plugs measured None feet true vertical 9012 6 feet Junk measured None feet Effective Depth measured 11910 feet Packer measured See Attachment feet true vertical 9013 43 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"x 30" 27-107 27-107 0 0 Surface 2667 13-3/8"72#N-80 26-2693 26-2692 73 4930 2670 Intermediate None None None None None None Production 8188 9-5/8"47#N-80 27-8215 27-7459 49 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 10705-11155 feet 11305-11740 feet 11830-11909 feet True Vertical depth 9010.92-9024 45 feet 9024 91 -9009 5 feet 9011 66-9013 45 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12 Stimulation or cement squeeze summary Intervals treated(measured) SCANNED ; ,L. .ii �� ,)u Treatment descriptions including volumes used and final pressure TG G 13 Representative Daily Average Production or Injection Data , Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure - Prior to well operation 241 19677 1 0 805 Subsequent to operation 724 20462 10 0 223 14 Attachments(required per 20 AAC 25 070 25 071,&25 283) 15 Well Class after work. Daily Report of Well Operations ❑✓ Exploratory❑ Development Q Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16 Well Status after work. Oil Q Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17 I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C 0 Exempt N/A Contact Nita Summerhays Email NIta.Summerhays(&bp.com Printed Name Nita Summerha / Title Data.Manager Mana er / i Sign �j�� ,- - �� /�/�/ Phone 564-4035 Date 6/17/2015 vri- 7-/91/5 - RBDMS ?\ JUN 2 5 2015 Form 10-404 Revised 10/2012 Submit Original Only Daily Report of Well Operations ADL0028280 ACTIVITYDATE I SUMMARY ***WELL SHUT IN ON ARRIVAL' (profile modification) DRIFT TBG TO LTP W/2.73" G. RING AT 9413' SLM PULLED 35 KB LTP FROM 9441' MD DRIFT W/1/75" CENT. INTO DEPLOYMENT SLV TO 9850' SLM RAN PDS 24 ARM CALIPER FROM 9700'SLM TO 9200' SLM PER PROGRAM(2 passes) GOOD DATA TAGGED DEPLOYMENT SLV W/2.73"G-RING @ 9430'SLM SET DEPLOYMENT SLEEVE STINGER SEAL ASSEMBLY INTO DEPLOYMENT SLEEVE AT 9,430' SLM 5/20/2015 """CONTINUE ON 5/21/2015*** """CONTINUE FROM 5/20/2015""" (profle modification) SET BAKER 35 KB PACKER W/ORIFICE SUB (3 ea 0.08" ports) ASSEMBLY INTO SEAL RECEPTACLE. TOP OF PACKER @ 9442' MD RAN PDS 24 ARM CALIPER ACROSS LTP PER PROGRAM (made 2 passes, 60'/min&50'/min) CALIPER INDICATES LTP SEALS —3' INTO DEPLOYMENT SLEEVE 5/21/2015 """WELL LEFT SHUT IN ON DEPARTURE, PAD OP NOTIFIED """ FLUIDS PUMPED BBLS 1 DIESEL 1 TOTAL a) D.• O O 0 0 0 0 N N CI�O I— O 0 O O CO tC) O N V N N- U N 0 0 00 0 0 L- CO CO O M C'') co 00 0) Cr 0 CO 00 00 CO oo V V CO 6) M CO p L CA N O N O f� CO c- LO CT CO CO O) CO O V CO CO CO CT N CO i H N Cr CO CO CO 10 Cfl Cn O N CO O Cr N M M N N M CO O C7) CO CO LO Cr 4 Ln M CC) ~O Li) O r- CA r C[) I - C() N O CO Cr CO 03 00 N 0) as a co< w N f� N C[) r- CO O Cr 00 N I-- V N N M Cr) N N- CO 0) C � J H 0 0 0 0 0 0 Q CD C.) CO CO °p °° CO O 00 U J Z Z4t J N CA - U N a0 00 N CV Ch Ln 4 c,') La co_ csiO N O 0) co co N C 00 CD ' CO a) N CO N 0) J Z CD 0 0 C W VaaaooItZZ Z W W W O m m O Z_ Z_ Z_ e j D D U J J J Q & H Packers and SSV's Attachment ADL0028280 SW Name Type MD TVD Depscription G-01 B PACKER 7734 7042.84 7" Liner Top Packer • G-01 B PACKER 9441 8619.16 KB Liner Top Packer TREE= 4-1/16"CMV WELLHEAD= M/cEVOYBAKH G-O 1 B 7"LNR(PARTIAL ROME))" MAX DOGLEG: 38" ACTUATOR= BAKER OKB.ELEV 61.83' I l I @ 10000*** BF.ELEV= 26.86' KOP 3200 2170' —I3-1/2"OTIS XBD SSSV LAND IW,D=2.75" Mlax Angle= 96"0 11350 —"CONDUC'TOR, MIN Datum MD= 9738' #. Onium TV D= 8800'SS D= ' 2186' H9-5/8"FOC 13-3/8"CSG,72#,N-80 BUTT,D=12.34r 2683• - 2691' —19-5A1"DV PKR — Minimum ID = 1.78" @ 9464' GAS LFT MANDRELS WIPER PLUG BUSHING , ST MD TVD DEV TYPE DMY LATCH PORT DATE IN DEPLOY SLEEVE 2`4377'4260 37 MMG DOME RK 16 10/13/14 1 7182 6570 32 MMG *OMY RK 0 05/04/14 lal ;dr.e1 *STA#1=OMY WHIM/CEMENT ESTIMATED TOP OF CBNBVT H -5800 . lk% TOP OF 7"LNR —{ 7727' VVI y ee'e+ 7727' __1_19-5/8"BKR TIEBACK SLV,D=7.50" • i' x.11 1�7A 7734' 9-5/8"X r BKR LIP BEHIND `f IP ' l&HYDHGR,D=6.188" CEMENT ti�' 9-5/8"CSG,47#,N-80 BUTT,D-8.681" —I 9174' I iP icpce 4 I"II /I' r....40' Ielm, 7 9-5/8'MLLOUT WINDOW(G-01A) @ 8170'-8215' S S" 11'OIA. `I A%_ NCI 00 4114 r LNR,29#,NT-80 XO 13CR-80 NSCC --I 8755' 9442' 35 KB LTPw i ORME SLE,D=1.81' r w/3 X 0.18"FORTS(05/21/15) 44 il TOP OF 2-3/8"LNR/CMT — 9455' 9455' 2.70`BKR DEPLOY SLV,D=2.25' VI ` eri 1w/IMPER PLUG BUSHING e 9464",ID=1.78 9466' -12-3/8"BTT PIP JOINT,D=1.995" 3-1/2'WHIPSTOCK(09/14/14) 9604' 3-1/2"TBG,9.2#,L-80 TDS — ^•9504 r ei® MLLOUT WINDOW(G-01B) @ 9504'-9513' .0087 bpf,D=2.992" iZ x 10283' —12-3/8-PUP w!RA PP TAG 11020' H2-3/8"PUP w/RA PP TAG ■ ■ NIIIP. 7"LNR,29#,13CR-80 NSCC, 10118' .0371 bpf,D=6.184" , ,,‘. ., ,,, PRORATION SUI MARY REF LOG:BKR RPM ON 10/06/14 ANGLE AT TOP PERF: 90"©10705' f-BTD(TAGGED 10/07/14) —{ 11910' .\ Nate:Refer to R'oduction DB historical pert datai1141. SIZE SPF IPI B VAL OPNISQZ SHOT SQZ it4 1.56" 6 10705-11155 0 10/07/14 2-3/8"LNR,4.7#,L-80 1H511, H 11945' 1.56" 6 11305-11740 0 10/07/14 .0039 bpf,D=1.995" 1.56" 6 11830-11909 0 10/07/14 DATE REV BY COM IENTS DATE REV BY COMMENTS PRUDHOE BAY UNT 06/18/76 RIG 36 ORIGINAL COMPLETION 03126/15 TFI-Y PJC SET KB LIP WELL: G-016 12/18/93 D-14 SIDETRACK COMPLETION 05/28/15 SV'C/ MC RESET KB LTP(05/21/15) PERMT Na: 2141030 10/08(14 NORDIC 1 CTD SIDETRACK API Na: 50-029-20214-02 10/30/14 NS/PJC FINAL ODEAPFi2OVAL SEC 12,T11N,R13E,2063'FNL&19745 FEL 11/04/14 NS/JMD REMOVE R31D(LANDNG COLLAR) 02/02/15 JMG/PJC RLL KB LIP BP Exploration(Alaska) STATE OF ALASKA , SKA OIL AND GAS CONSERVATION COM. SION REPORT OF SUNDRY WELL OPERATIONS • 1 Operations Abandon ❑ Repair Well❑ Plug Perforations ❑ Perforate ❑ Other H Set LTP Performed Alter Casing ❑ Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time Extensions Change Approved Program ❑ Operat.Shutdowns Stimulate-Other ❑ Re-enter Suspended Wells 2 Operator 4 Well Class Before Work: 5 Permit to Drill Number Name BP Exploration(Alaska),Inc Developmert0 Exploratory ❑ 214-103-0 3 Address P 0 Box 196612 Stratigraphic❑ Service ❑ 6.API Number Anchorage,AK 99519-6612 50-029-20214-02-00 7 Property Designation(Lease Number): 8 Well Name and Number ADL0028280 PBU G-01B 9 Logs(List logs and submit electronic and printed data per 20AAC25 071). 10 Field/Pool(s) PRUDHOE BAY,PRUDHOE OIL 11 Present Well Condition Summary RECEIVED Total Depth measured 11953 feet Plugs measured None feet true vertical 9012 6 feet Junk measured None feet APR 14 2015 Effective Depth measured 11910 feet Packer measured See Attachment feet y� O G CC true vertical 9013 43 feet true vertical See Attachment feet H Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"x 30" 27-107 27-107 0 0 Surface 2667 13-3/8"72#N-80 26-2693 26-2692 73 4930 2670 Intermediate None None None None None None Production 8188 9-5/8"47#N-80 27-8215 27-7459 49 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 10705-11155 feet 11305-11740 feet 11830-11909 feet True Vertical depth 9010 92-9024 45 feet 9024 91 -9009 5 feet 9011 66-9013.45 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12 Stimulation or cement squeeze summary. Intervals treated(measured) �i A� Treatment descriptions including volumes used and final pressure S�ANN�G MAY 4 ZQ 15 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 322 4460 7 0 232 Subsequent to operation 0 0 0 0 0 14 Attachments 15 Well Class after work Copies of Logs and Surveys Run Exploratory❑ Development❑' Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16 Well Status after work Oil H Gas ❑ WDSPL❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUco 17 I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C 0 Exempt N/A Contact Nita Summerhays r Email Nita.Summerhays(U�bp.com Printed Name Ni - Summer ' h,h / Title Petrotechnical Data Engineer Signature / /, ,_P1i �tPhone 564-4035 Date 4/13/2015 art 57"!i RBDMO PR 1 8 2015 Form 10-404 Revised 10/2012 Submit Original Only • Daily Report of Well Operations ADL0028280 ACTtTYDAT I SUMMARY T/I/0=2300/1300/180 Temp= S/I Assist S is e w reeze Orb nect/ B&F. (Profile Modification) Pumped 10 bbls meth and 61 bbls crude down FL to freeze protect using west side recipe.Pumped 55 bbls of 180*crude down TBG followed by 55 bbls of 80*crude. ***Continued 3/25/2015 on 03-26-15 WSR*** • ***WELL FLOWING ON ARRIVAL***(profile modification) TAGGED BKR DEPLOYMENT SLEEVE W/2.72" LIB @ 9,455' MD.(recovered impression) LRS PUMPED 110 BBLS OF 180*CRUDE DOWN TBG.(see Irs log) BRUSH & FLUSHED TBG W/3-1/2" BRUSH &2-7/8" BRUSH DOWN TO DEPLOYMENT SLEEVE @ 9,455' MD. DRIFTED TBG W/20' x 2.74"WHIPSTOCK DRIFT &2.25" LTP STINGER DOWN TO DEPLOYMENT SLEEVE @ 9,455' MD.(pins sheared) DRIFTED THROUGH LINER W/ 1.69" DRIFT DOWN TO 9,600' SLM.(no issues) 3/25/2015 ***CONT'D ON 03/26/15 WSR*** ****Continued from 03-25-15 WSR*** Assist Slickline Pumped 22 bbls of 40*crude down TBG to assist SL settting tool. S-line on well on dep. Wing shut swab shut ssv shut master open casing valves open to 3/26/2015 gauges Final Whp's=600/1204/0 ***CONT'D FROM 03/35/15 WSR***(profile modification) RAN PDS 24 ARM CALIPER FROM 9,600' SLM TO 9,300' SLM.(good data) SET 35 KB LTP W/ FIXED ORFICE SUB @ 9,438' SLM RAN PDS 24 ARM CALIPER FROM 9,600' SLM TO 9,300' SLM.(good data) 3/26/2015 ***WELL SHUT IN ON DEPARTURE*** FLUIDS PUMPED BBLS 10 METH 39 CRUDE 1 DIESEL 50 TOTAL C1) Q. OOooOO000 R N N CO (Co) O I� CO 0 V N f� 0 N 0 0 0 0 0 i CO (.O O I� co M O 3 co O m co co CO V co V CO O) co CO co N- CC) CA N CA N a f� CO 1— 6) M CO O) CO O V (0 CO N- CO O N- N 00 CI 11 I I III I I-- N V CO CO CO U) N- O C1"56 I- CO O V N co N co N N CO M O CA CO • N- CO tf) Lo co co CO O VC)) -i' in O LO O N CO CO co C) � co (NI O) V CTS O 4" CO N CO NLOLO � COov (V N I- N N N CO CO C O N- CO O) la C J H 0 0 0 0 a) °o ad- Z J J d o N N N .N N X f\ I` • fA - *k - (A U N NN Lu 92 M N N - M i c- r` CT 4 Ch • . coO O Cp 1:7)O N O CO CO N 0 CO O V CO 437 N CO N CA -J • Z • O D D U O O V 'I3Dc D D OLLZZ z w w w O m m Q Z Z Z D. D J J UJJ - QU) F- H II I� Packers and SSV's Attachment ADL0028280 SW Name Type MD TVD Depscription G-01 B PACKER 7734 7042.84 7" Liner Top Packer G-01 B PACKER 9441 8619.16 KB Liner Top Packer TREE= 4-1/16"CNV L. TY NOTES: WELL ACTUATOR AD= PRBAKH EVOY G-O 1 B 7"LNR(PARTIAL CHROME()* MAX DOGLEG: 38° ACTUATOR= BAKER OKB.ELEv= 61.83' I l I @ 10000°" BF.ELEV= 26 86' KOP= 3206' 2170' H3-1/2"OTIS XBD SSSV LAND NP D=2.75' PRex Angle= 96'@ 11350' —"CDPDI CTOR, 11=11111 Datum MD= 9738' #, , Datum ND= 8800'SS D= 1 2186' H9-5/8-FOC 2691' —{9 5r8"Dv HCR 13-3/8"CSG,72#,N-80 BUTT,D=12.347' — 2693' — — Minimum ID = 1.78" @ 9464' GAS LFT MANDREI-S WIPER PLUG BUSHING ST MD ND DEV TYPE DMY LATCH PORT CATE IN DEPLOY SLEEVE 2 4377 4260 37 Prf,4G DONE` RK 16 10/13/14 1 7182 6570 32 WIG *DAY RK 0 05/04/14 *STA#1=DMY BEHIND CEMBIT ESTIMATED TOP OFCB4 '4T —{ —5800 eliPte TOP OF 7"LNR 7727' 7727' —19-5/8"BKR TIEBACK SLV,D=7.50" !II:<.„,S4 t C. 7734' 9-5/8"X 7'BKR LW BEHIND &HYD HGR,D=6.188" CEMENT 9-5/8"CSG 47#,N-80 BUTT,D=8.681' H 9174' ..% 9-5/8"MLLOUT WNDOW(G-01A) @ 8170'-8215' 011 01 40,,e/Pire, ilk, .:Ap " A r LNR 29#,NT-80 XO 13CR-80 NSCC —) 8756' •/'''''' 755' OP9441' �35 KB P w/ORIFICE SUB.ID=1.81" w/2X 0.25"PORTS(03/26/15) TOP OF 2-3/8"LNCM R/ T ---19455' r. 9455' —2.70"BKR DEPLOY SLV,D=2.25" ek,I ? i - w/WIPER PLUG BUSHING @ 9454',ID=1.78" i I 1. c4 4 ' 9466' _H2-3/8"BIT FUP JONT,D=1.995" 3-1/2"WI PSTOCK(09/14/14) —I 9504' IV j NA 3-1/2'TBG,9.2#,L-80 TDB, H —9504L -ve., ..t ej ML LOUT WINDOW(G-016) @ 9504'-9513' .0087 bpf,D=2.992" 10283' 12-3/8"PUP w/RA PP TAG a 11020' H2-3/8"PtPw/RA PP TAG ■ ■ •e. ''IQ. 7"LNR,29#,13CR-80 NSCC, 10118' 41/4 0371 bpf,ID=6.184" 11111ML= 4P dr 1'- A PERFORATION SUMMARY '11*A REF LOG:BKR FIRM ON 10/06/14 ' ANGLE AT TOP PERF: 90°0 10705' FWD(TAGGED 10107/14) -{ 11910' "�` , Nate:Refer to Production DB historical perf data �� `s.. SIZE SPF INTERVAL OPWSQZ SHOT SQZ �+ - 1.56" 6 10705-11155 0 10/07/14 2-3/8'LNR,4,7#,L-80 Tt 511, H 11945' 1.56" 6 11305-11740 0 10107/14 .0039 bpf,D=1.995' 1.56" 6 11830-11909 0 10/07/14 DATE REV BY COMvENTS DATE REV BY COMWENTS PRUDHOE BAY UMT 06/18/76 RIG 36 ORIGINAL COMPLETION 10/30/14 NS1 PJC FINAL ODE APPROVAL WELL: G-018 12/18/93 D-14 SIDETRACK COMPLETION 11/04/14 NS/JMD REMOVE PBTD(LA COLLAR) PERMT No: 2141030 10/08/14 NORDIC 1 CTD SIDETRACK 02/02/15 MG/PJC.'/PULL KB LW API No: 50-029-20214-02 10/14/14 PJC DRLG HO CORRECTIONS 03/26/15 TFW PJC SET KB LW SEC 12,T11N,R13E,2063'FNL&19745 FEL 10/15/14 MIC/PJC GLV CIO&SET LTP(10/13/14) 10/20/14 M/PJC Rev EOW Corrections r BP Exploration(Alaska) alt(-rb3 RECEIVED ZSS5cI APR 0 8 2015 Letter of Transmittal AOGCC BAKER Date: April 8, 2015 HUGHES To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Paula Lacey Paula.Lacey@bakerhughes.com Please find enclosed the TVDSS/MWD data for the following well(s): G-01BPB2 Enclosed for each well(s): 2 hardcopy prints of TVDSS/MWD Final Logs 1 compact disk containing TVDSS/MWD Final Field Data Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 scoviED APR 0 9 2015 to acknowledge receipt of this data. RECEIVED BY: _ U —� , State of Alaska AOGCC DATE: a <<-(- (03 RECEIVED Z5 5v APR 0 8 2015 Letter of Transmittal VIU AOGGG BAKER Date: April 8, 2015 HUGHES To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7`h Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Paula Lacey Paula.Lacey@bakerhughes.com Please find enclosed the TVDSS/MWD data for the following well(s): G-01 BPB 1 Enclosed for each well(s): 2 hardcopy prints of TVDSS/MWD Final Logs 1 compact disk containing TVDSS/MWD Final Field Data Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 swap APR 0 9 2315 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: State of Alaska AOGCC DATE: 214103 RECEIVED MAR 1 1 2015 Letter of Transmittal Midi AOGCC 2 5 -50--_5_-- 2 5 5 0 6 2 5 5 0 7 BAKER Date: DATA LOGGED 3 itv2oi� March 10, 2015 �1.K BENDER HUGHES To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Paula Lacey paula.lacey@bakerhughes.com Please find enclosed the final directional survey data for the following well(s): G-01 BPB2, G-01 BPB 1, G-01 B Enclosed for each well(s): 2 hardcopy prints of final directional survey reports 1 compact disc of final directional survey reports Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: Oe4, State of Alaska AOGCC DATE: 214103 25507 RECEIVED bp MAR 1 1 2015 AOGGC North America - ALASKA - BP Prudhoe Bay PB G Pad G-01 500292021400 G-01 BPB2 Design: G-01 BPB2 Survey Report - Geographic 07 October, 2014 rpI BAKER HUGHES r,- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-01 Project: Prudhoe Bay ND Reference: RKB G-01A @ 70.67usft Site: PB G Pad MD Reference: RKB G-01A @ 70.67usft Well: G-01 North Reference: True Wellbore: G-01BPB2 Survey Calculation Method: Minimum Curvature Design: G-01BPB2 Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB G Pad,TR-11-13 Site Position: Northing: 5,966,832 87 usft Latitude: 70°18'58.211 N From: Map Easting: 656,301.39 usft Longitude: 148°43'59.01 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.19° Well G-01 API No. 500292021400 Well Position +NI-S 0.00 usft Northing: 5,969,586.00 usft Latitude: 70°19'24.885 N +E/-W 0.00 usft Easting: 658,241.00 usft Longitude: 148°43'0.74 W Position Uncertainty 0.00 usft Wellhead Elevation: 34.97 usft Ground Level: 33.25 usft Wellbore G-01BPB2 API no. 500292021471 Magnetics Model Name Sample Date Declination Dip Angle Field Strength 11 1°I (nT) BGGM2014 9/29/2014 19 63 81.02 57,602 Design G-01BPB2 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 9,497.81 Vertical Section: Depth From(ND) +NI-S +E/-W Direction (usft) (usft) (usft) (°) 35.67 0 00 0.00 12.59 Survey Program Date: 10/7/2014 , From To (usft) (usft) Survey(Wellbore) Tool Name Description 106.02 8,103.20 1 :Camera based gyro multisho(G-01) CB-GYRO-MS Camera based gyro multishot 8,167.18 9,494.99 2:MWD-Standard(G-01A) MWD MWD-Standard 9,497.81 9,590.49 INC+TREND(G-01BPB1) INC+TREND Inclinometer+known azi trend 9,620.14 9,772.27 MWD(G-01BPB1) MWD MWD-Standard 9,774.00 9,800.28 INC+TREND(G-01BPB2) INC+TREND Inclinometer+known azi trend 9,830.19 10,410.21 MWD(G-01BPB2) MWD MWD-Standard 10/7/2014 12.52:03PM Page 2 COMPASS 5000.1 Build 61 Fa - 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-01 Project: Prudhoe Bay TVD Reference: RKB G-01A @ 70.67usft Site: PB G Pad MD Reference: RKB G-01A @ 70.67usft Well: G-01 North Reference: True Wellbore: G-01 BPB2 Survey Calculation Method: Minimum Curvature Design: G-01 BPB2 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +Nl-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,497.81 39.73 56.70 8,664.38 2,940.04 -80.17 5,972,523.48 658,098.87 70°19'53.800 N 148°43'3.08 W G-01BPB1 TIP 9,501.50 39.88 56.71 8,667.22 2,941.33 -78.19 5,972,524.82 658,100.82 70°19'53.812 N 148°43'3.02 W G-01BPB1 KOP 9,532.57 33.51 61.44 8,692.12 2,950.91 -62.31 5,972,534.73 658,116.49 70°19'53.906 N 148°43'2.56 W Interpolated Azimuth 9,562.61 29.61 66.61 8,717.72 2,957.83 -48.21 5,972,541.94 658,130.44 70°19'53.975 N 148°43'2.14 W Interpolated Azimuth ' 9,622.96 30.31 79.06 8,770.05 2,966.65 -19.55 5,972,551.36 658,158.91 70°19'54.061 N 148°43'1.31 W 9,654.16 30.01 86.22 8,797.04 2,968.66 -4.03 5,972,553.70 658,174.39 70°19'54.081 N 148°43'0.85 W 9,682.20 28.77 88.87 8,821.47 2,969.25 9.72 5,972,554.58 658,188.11 70°19'54.087 N 148°43'0.45 W 9,712.68 28.28 81.86 8,848.26 2,970.42 24.20 5,972,556.06 658,202.57 70°19'54.098 N 148°43'0.03 W 9,742.59 28.98 74.52 8,874.52 2,973.36 38.21 5,972,559.29 658,216.51 70°19'54.127 N 148°42'59.62 W 9,772.27 30.50 81.25 8,900.30 2,976.42 52.58 5,972,562.66 658,230.82 70°19'54.157 N 148°42'59.20 W G-01BPB2 TIP 9,774.00 30.64 81.60 8,901.79 2,976.55 53.45 5,972,562.81 658,231.68 70°19'54.159 N 148°42'59.18 W G-01BPB2 KOP 9,800.28 37.27 81.70 8,923.57 2,978.68 67.97 5,972,565.24 658,246.15 70°19'54.180 N 148°42'58.75 W Interpolated Azimuth 9,830.19 44.79 82.19 8,946.12 2,981.43 87.40 5,972,568.39 658,265.51 70°19'54.207 N 148°42'58.19 W 9,860.79 52.11 86.70 8,966.41 2,983.59 110.17 5,972,571.04 658,288.23 70°19'54.228 N 148°42'57.52 W 9,890.40 57.41 92.87 8,983.50 2,983.64 134.32 5,972,571.59 658,312.38 70°19'54.228 N 148°42'56.82 W 9,920.37 63.42 98.47 8,998.30 2,981.03 160.23 5,972,569.53 658,338.33 70°19'54.203 N 148°42'56.06 W 9,950.40 68.79 103.77 9,010.46 2,975.71 187.14 5,972,564.78 658,365.35 70°19'54.150 N 148°42'55.27 W 9,983.63 75.11 111.25 9,020.77 2,966.18 217.22 5,972,555.89 658,395.62 70°19'54.057 N 148°42'54.39 W 10,010.29 78.59 118.87 9,026.84 2,955.19 240.71 5,972,545.39 658,419.33 70°19'53.948 N 148°42'53.71 W 10,030.54 80.59 124.24 9,030.50 2,944.76 257.67 5,972,535.33 658,436.51 70°19'53.846 N 148°42'53.21 W 10,060.28 82.18 127.24 9,034.96 2,927.59 281.53 5,972,518.67 658,460.73 70°19'53.677 N 148°42'52.52 W 10,090.34 81.27 118.29 9,039.29 2,911.51 306.52 5,972,503.11 658,486.05 70°19'53.519 N 148°42'51.79 W 10,120.31 83.35 111.03 9,043.31 2,899.13 333.49 5,972,491.31 658,513.27 70°19'53.397 N 148°42'51.00 W 10,150.67 87.88 105.04 9,045.63 2,889.77 362.26 5,972,482.56 658,542.23 70°19'53.305 N 148°42'50.16 W 10,180.63 91.90 100.97 9,045.69 2,883.03 391.44 5,972,476.43 658,571.54 70°19'53.239 N 148°42'49.31 W 10,210.07 96.40 98.59 9,043.56 2,878.04 420.36 5,972,472.06 658,600.56 70°19'53.190 N 148°42'48.46 W 10,240.02 95.22 94.07 9,040.52 2,874.76 449.97 5,972,469.40 658,630.23 70°19'53.157 N 148°42'47.60 W 10,270.12 94.94 90.09 9,037.86 2,873.67 479.93 5,972,468.94 658,660.20 70°19'53.147 N 148°42'46.72 W 10,300.09 93.71 83.59 9,035.60 2,875.32 509.75 5,972,471.22 658,689.98 70°19'53.163 N 148°42'45.85 W 10,330.19 95.56 79.64 9,033.16 2,879.69 539.42 5,972,476.22 658,719.55 70°19'53.206 N 148°42'44.99 W 10,360.20 95.81 74.89 9,030.19 2,886.27 568.54 5,972,483.41 658,748.52 70°19'53.271 N 148°42'44.14 W 10,390.75 97.14 69.87 9,026.74 2,895.45 597.46 5,972,493.20 658,777.24 70°19'53.361 N 148°42'43.29 W 10,410.21 96.55 66.98 9,024.42 2,902.56 615.43 5,972,500.68 658,795.05 70°19'53.431 N 148°42'42.77 W 10,450.00 96.55 66.98 9,019.88 2,918.02 651.81 5,972,516.90 658,831.10 70°19'53.583 N 148°42'41.71 W Projection to TD 10/7/2014 12:52:03PM Page 3 COMPASS 5000.1 Build 61 214103 25507 RECEIVED MAR 1 1 2015 S bp AOGCC North America - ALASKA - BP Prudhoe Bay PB G Pad G-01 500292021400 G-01 BPB2 Design: G-01 BPB2 • Survey Report - Geographic 07 October, 2014 FARM BAKER HUGHES INV- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-01 Project: Prudhoe Bay ND Reference: RKB G-01A @ 70.67usft Site: PB G Pad MD Reference: RKB G-01A @ 70.67usft Well: G-01 North Reference: True Wellbore: G-01 BPB2 Survey Calculation Method: Minimum Curvature Design: G-01 BPB2 Database: EDM R5K-Alaska PROD-ANCP1 i Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB G Pad,TR-11-13 Site Position: Northing: 5,966,832.87 usft Latitude: 70°18'58.211 N From: Map Easting: 656,301.39 usft Longitude: 148°43'59.01 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.19° Well G-01 API No. 500292021400 Well Position +N/-S 0.00 usft Northing: 5,969,586.00 usft Latitude: 70°19'24.885 N +E/-W 0.00 usft Easting: 658,241.00 usft Longitude: 148°43'0.74 W Position Uncertainty 0.00 usft Wellhead Elevation: 34.97 usft Ground Level: 33.25 usft Wellbore G-01BPB2 API no. 500292021471 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (0) (0) (nT) BGGM2014 9/29/2014 19.63 81.02 57,602 Design G-01BPB2 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 9,497 81 Vertical Section: Depth From(ND) +N/-S +E/-W Direction (usft) (usft) (usft) (°) 35.67 0 00 0.00 12.59 Survey Program Date: 10/7/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 106.02 8,103.20 1 :Camera based gyro multisho(G-01) CB-GYRO-MS Camera based gyro multishot 8,167.18 9,494.99 2:MWD-Standard(G-01A) MWD MWD-Standard 9,497.81 9,590.49 INC+TREND(G-01BPB1) INC+TREND Inclinometer+known azi trend 9,620.14 9,772.27 MWD(G-01 BPB1) MWD MWD-Standard 9,774.00 9,800.28 INC+TREND(G-01 BPB2) INC+TREND Inclinometer+known azi trend 9,830.19 10,410.21 MWD(G-01BPB2) MWD MWD-Standard 10/7/2014 12:52:03PM Page 2 COMPASS 5000.1 Build 61 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-01 Project: Prudhoe Bay TVD Reference: RKB G-01A @ 70.67usft as Site: PB G Pad MD Reference: RKB G-01A @ 70.67usft . ' Well: G-01 North Reference: True Wellbore: G-01 BPB2 Survey Calculation Method: Minimum Curvature Design: G-01 BPB2 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-S +EJ-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,497.81 39.73 56.70 8,664.38 2,940.04 -80.17 5,972,523.48 658,098.87 70°19'53.800 N 148°43'3.08 W G-01BPB1 TIP 9,501.50 39.88 56.71 8,667.22 2,941.33 -78.19 5,972,524.82 658,100.82 70°19'53.812 N 148°43'3.02 W G-01BPB1 KOP 9,532.57 33.51 61.44 8,692.12 2,950.91 -62.31 5,972,534.73 658,116.49 70°19'53.906 N 148°43'2.56 W Interpolated Azimuth 9,562.61 29.61 66.61 8,717.72 2,957.83 -48.21 5,972,541.94 658,130.44 70°19'53.975 N 148°43'2.14 W Interpolated Azimuth 9,622.96 30.31 79.06 8,770.05 2,966.65 -19.55 5,972,551.36 658,158.91 70°19'54.061 N 148°43'1.31 W 9,654.16 30.01 86.22 8,797.04 2,968.66 -4.03 5,972,553.70 658,174.39 70°19'54.081 N 148°43'0.85 W 9,682.20 28.77 88.87 8,821.47 2,969.25 9.72 5,972,554.58 658,188.11 70°19'54.087 N 148°43'0.45 W 9,712.68 28.28 81.86 8,848.26 2,970.42 24.20 5,972,556.06 658,202.57 70°19'54.098 N 148°43'0.03 W 9,742.59 28.98 74.52 8,874.52 2,973.36 38.21 5,972,559.29 658,216.51 70°19'54.127 N 148°42'59.62 W 9,772.27 30.50 81.25 8,900.30 2,976.42 52.58 5,972,562.66 658,230.82 70°19'54.157 N 148°42'59.20 W G-01BPB2 TIP 9,774.00 30.64 81.60 8,901.79 2,976.55 53.45 5,972,562.81 658,231.68 70°19'54.159 N 148°42'59.18 W G-01BPB2 KOP 9,800.28 37.27 81.70 8,923.57 2,978.68 67.97 5,972,565.24 658,246.15 70°19'54.180 N 148°42'58.75 W Interpolated Azimuth 9,830.19 44.79 82.19 8,946.12 2,981.43 87.40 5,972,568.39 658,265.51 70°19'54.207 N 148°42'58.19 W 9,860.79 52.11 86.70 8,966.41 2,983.59 110.17 5,972,571.04 658,288.23 70°19'54.228 N 148°42'57.52 W 9,890.40 57.41 92.87 8,983.50 2,983.64 134.32 5,972,571.59 658,312.38 70°19'54.228 N 148°42'56.82 W 9,920.37 63.42 98.47 8,998.30 2,981.03 160.23 5,972,569.53 658,338.33 70°19'54.203 N 148°42'56.06 W 9,950.40 68.79 103.77 9,010.46 2,975.71 187.14 5,972,564.78 658,365.35 70°19'54.150 N 148°42'55.27 W 9,983.63 75.11 111.25 9,020.77 2,966.18 217.22 5,972,555.89 658,395.62 70°19'54.057 N 148°42'54.39 W 10,010.29 78.59 118.87 9,026.84 2,955.19 240.71 5,972,545.39 658,419.33 70°19'53.948 N 148°42'53.71 W 10,030.54 80.59 124.24 9,030.50 2,944.76 257.67 5,972,535.33 658,436.51 70°19'53.846 N 148°42'53.21 W 10,060.28 82.18 127.24 9,034.96 2,927.59 281.53 5,972,518.67 658,460.73 70°19'53.677 N 148°42'52.52 W 10,090.34 81.27 118.29 9,039.29 2,911.51 306.52 5,972,503.11 658,486.05 70°19'53.519 N 148°42'51.79 W 10,120.31 83.35 111.03 9,043.31 2,899.13 333.49 5,972,491.31 658,513.27 70°19'53.397 N 148°42'51.00 W 10,150.67 87.88 105.04 9,045.63 2,889.77 362.26 5,972,482.56 658,542.23 70°19'53.305 N 148°42'50.16 W 10,180.63 91.90 100.97 9,045.69 2,883.03 391.44 5,972,476.43 658,571.54 70°19'53.239 N 148°42'49.31 W 10,210.07 96.40 98.59 9,043.56 2,878.04 420.36 5,972,472.06 658,600.56 70°19'53.190 N 148°42'48.46 W 10,240.02 95.22 94.07 9,040.52 2,874.76 449.97 5,972,469.40 658,630.23 70°19'53.157 N 148°42'47.60 W 10,270.12 94.94 90.09 9,037.86 2,873.67 479.93 5,972,468.94 658,660.20 70°19'53.147 N 148°42'46.72 W 10,300.09 93.71 83.59 9,035.60 2,875.32 509.75 5,972,471.22 658,689.98 70°19'53.163 N 148°42'45.85 W 10,330.19 95.56 79.64 9,033.16 2,879.69 539.42 5,972,476.22 658,719.55 70°19'53.206 N 148°42'44.99 W 10,360.20 95.81 74.89 9,030.19 2,886.27 568.54 5,972,483.41 658,748.52 70°19'53.271 N 148°42'44.14 W 10,390.75 97.14 69.87 9,026.74 2,895.45 597.46 5,972,493.20 658,777.24 70°19'53.361 N 148°42'43.29 W 10,410.21 96.55 66.98 9,024.42 2,902.56 615.43 5,972,500.68 658,795.05 70°19'53.431 N 148°42'42.77 W 10,450.00 96.55 66.98 9,019.88 2,918.02 651.81 5,972,516.90 658,831.10 70°19'53.583 N 148°42'41.71 W Projection to TD 10/7/2014 12:52:03PM Page 3 COMPASS 5000.1 Build 61 214103 25506 RECEIVED MAR 1 1 Z015 bp AOGCC North America - ALASKA - BP Prudhoe Bay PB G Pad G-01 500292021400 G-01 BPB1 Design: G-01 BPB1 Survey Report - Geographic 07 October, 2014 BAKER HUGHES MP- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-01 Project: Prudhoe Bay ND Reference: RKB G-01A@ 70.67usft Site: PB G Pad MD Reference: RKB G-01A @ 70.67usft Well: G-01 North Reference: True Wellbore: G-01BPB1 Survey Calculation Method: Minimum Curvature Design: G-01BPB1 Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB G Pad,TR-11-13 Site Position: Northing: 5,966,832.87 usft Latitude: 70°18'58.211 N From: Map Easting: 656,301.39 usft Longitude: 148°43'59.01 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.19° Well G-01 API No. 500292021400 Well Position +N/-S 0.00 usft Northing: 5,969,586.00 usft Latitude: 70°19'24.885 N +E/-W 0.00 usft Easting: 658,241.00 usft Longitude: 148°43'0.74 W Position Uncertainty 0.00 usft Wellhead Elevation: 34.97 usft Ground Level: 33.25 usft Wellbore G-01BPB1 API no. 500292021470 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2014 9i19/2014 19 65 81 02 57.603 Design G-01BPB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,497.81 Vertical Section: Depth From(ND) +NI-S +E1-W Direction (usft) (usft) (usft) (°) 35.67 0.00 0.00 2.82 Survey Program Date: 10/1/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 108.84 8,106.02 1 :Camera based gyro multisho(G-01) CB-GYRO-MS Camera based gyro multishot 8,170.00 9,497.81 2:MWD-Standard(G-01A) MWD MWD-Standard 9,501.50 9,593.31 INC+TREND(G-01BPB1) INC+TREND Inclinometer+known azi trend 9,622.96 9,981.83 MWD(G-01BPB1) MWD MWD-Standard 10/7/2014 10:50:54AM Page 2 COMPASS 5000.1 Build 61 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-01 Project: Prudhoe Bay TVD Reference: RKB G-01A@ 70.67usft Site: PB G Pad MD Reference: RKB G-01A @ 70.67usft Well: G-01 North Reference: True Wellbore: G-01BPB1 Survey Calculation Method: Minimum Curvature Design: G-01 BPB1 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting ' (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,497.81 39.73 56.70 8,664.38 2,940.04 -80.17 5,972,523.48 658,098.87 70`19'53.800 N 148°43'3.08 W G-01BPB1 TIP 9,501.50 39.88 56.71 8,667.22 2,941.33 -78.19 5,972,524.82 658,100.82 70°19'53.812 N 148°43'3.02 W G-01BPB1 KOP 9,532.57 33.51 61.44 8,692.12 2,950.91 -62.31 5,972,534.73 658,116.49 70°19'53.906 N 148°43'2.56 W Interpolated Azimuth 9,562.61 29.61 66.61 8,717.72 2,957.83 -48.21 5,972,541.94 658,130.44 70°19'53.975 N 148°43'2.14 W Interpolated Azimuth 9,593.31 29.85 72.58 8,744.38 2,963.13 -33.96 5,972,547.54 658,144.58 70°19'54.027 N 148°43'1.73 W Interpolated Azimuth 9,622.96 30.31 79.06 8,770.05 2,966.76 -19.57 5,972,551.47 658,158.89 70°19'54.062 N 148°43'1.31 W 9,654.16 30.01 86.22 8,797.03 2,968.77 -4.05 5,972,553.81 658,174.36 70°19'54.082 N 148°43'0.86 W 9,682.20 28.77 88.87 8,821.46 2,969.36 9.70 5,972,554.70 658,188.09 70°19'54.088 N 148°43'0.45 W 9,712.68 28.28 81.86 8,848.25 2,970.53 24.18 5,972,556.17 658,202.55 70°19'54.099 N 148°43'0.03 W 9,742.59 28.98 74.52 8,874.51 2,973.47 38.19 5,972,559.40 658,216.48 70°19'54.128 N 148°42'59.62 W 9,772.27 30.50 81.25 8,900.29 2,976.53 52.56 5,972,562.77 658,230.79 70°19'54.158 N 148°42'59.20 W 9,802.19 32.97 86.84 8,925.74 2,978.14 68.20 5,972,564.70 658,246.39 70°19'54.174 N 148°42'58.75 W 9,832.43 31.04 86.99 8,951.38 2,979.00 84.21 5,972,565.90 658,262.37 70°19'54.183 N 148°42'58.28 W 9,862.58 26.12 87.61 8,977.85 2,979.69 98.61 5,972,566.89 658,276.76 70°19'54.189 N 148°42'57.86 W 9,892.17 22.92 90.06 9,004.77 2,979.95 110.88 5,972,567.42 658,289.02 70°19'54.192 N 148°42'57.50 W 9,923.03 19.32 94.49 9,033.55 2,979.55 121.98 5,972,567.24 658,300.13 70°19'54.188 N 148°42'57.18 W 9,953.47 15.62 100.05 9,062.59 2,978.44 131.04 5,972,566.32 658,309.21 70°19'54.177 N 148°42'56.91 W 9,981.83 12.23 108.52 9,090.11 2,976.82 137.65 5,972,564.84 658,315.85 70°19'54.161 N 148°42'56.72 W 10,025.00 12.23 108.52 9,132.30 2,973.91 146.32 5,972,562.12 658,324.58 70°19'54.133 N 148°42'56.46 W Projection to TO 10/7/2014 10:50:54AM Page 3 COMPASS 5000.1 Build 61 ?_ 1 4 1 0 3 25506 RECEIVED ( bptiMAR 112015 AOGCC N North America - ALASKA - BP Prudhoe Bay PB G Pad G-01 500292021400 G-01 BPB1 • Design: G-01 BPB1 Survey Report - Geographic 07 October, 2014 vI BAKER HUGHES P Survey Report-Geographic BAKER �`we. HUGHES Com pan North America-ALASKA-BP Local Co-ordinate Reference: Well G-01 .Y Project: Prudhoe Bay TVD Reference: RKB G-01A @ 70.67usft Site: PB G Pad MD Reference: RKB G-01A @ 70.67usft 5.. a, Well: G-01 North Reference: True Wellbore: G-01BPB1 Survey Calculation Method: Minimum Curvature Design: G-01BPB1 Database: EDM R5K-Alaska PROD-ANCP1 J Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB G Pad,TR-11-13 Site Position: Northing: 5,966,832.87 usft Latitude: 70°18'58.211 N From: Map Easting: 656,301.39 usft Longitude: 148°43'59.01 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.19 ° Well G-01 API No. 500292021400 Well Position +NI-S 0.00 usft Northing: 5,969,586.00 usft Latitude: 70°19'24.885 N +E/-W 0.00 usft Easting: 658,241.00 usft Longitude: 148°43'0.74 W Position Uncertainty 0.00 usft Wellhead Elevation: 34.97 usft Ground Level: 33.25 usft Wellbore G-01BP61API no. 500292021470 '" Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2014 9/19/2014 19.65 81.02 57,603 Design G-01BPB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9497.81 Vertical Section: Depth From(TVD) +N/-S +EI-W Direction (usft) (usft) (usft) (°) 35.67 0.00 0.00 2.82 Survey Program Date: 10/1/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 108.84 8,106.02 1 :Camera based gyro multisho(G-01) CB-GYRO-MS Camera based gyro multishot 8,170.00 9,497.81 2.MWD-Standard(G-01A) MWD MWD-Standard 9,501.50 9,593.31 INC+TREND(G-01BPB1) INC+TREND Inclinometer+known azi trend 9,622.96 9,981.83 MWD(G-01 BPB1) MWD MWD-Standard 10/7/2014 10:50:54AM Page 2 COMPASS 5000.1 Build 61 fe) bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-01 Project: Prudhoe Bay TVD Reference: RKB G-01A @ 70.67usft Site: PB G Pad MD Reference: RKB G-01A @ 70.67usft Well: G-01 North Reference: True Wellbore: G-01 BPB1 Survey Calculation Method: Minimum Curvature Design: G-01BPB1 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,497.81 39.73 56.70 8,664.38 2,940.04 -80.17 5,972,523.48 658,098.87 70°19'53.800 N 148°43'3.08 W G-01BPB1 TIP 9,501.50 39.88 56.71 8,667.22 2,941.33 -78.19 5,972,524.82 658,100.82 70°19'53.812 N 148°43'3.02 W G-01BPB1 KOP 9,532.57 33.51 61.44 8,692.12 2,950.91 -62.31 5,972,534.73 658,116.49 70°19'53.906 N 148°43'2.56 W Interpolated Azimuth 9,562.61 29.61 66.61 8,717.72 2,957.83 -48.21 5,972,541.94 658,130.44 70°19'53.975 N 148°43'2.14 W Interpolated Azimuth 9,593.31 29.85 72.58 8,744.38 2,963.13 -33.96 5,972,547.54 658,144.58 70°19'54.027 N 148°43'1.73 W Interpolated Azimuth 9,622.96 30.31 79.06 8,770.05 2,966.76 -19.57 5,972,551.47 658,158.89 70°19'54.062 N 148°43'1.31 W 9,654.16 30.01 86.22 8,797.03 2,968.77 -4.05 5,972,553.81 658,174.36 70°19'54.082 N 148°43'0.86 W 9,682.20 28.77 88.87 8,821.46 2,969.36 9.70 5,972,554.70 658,188.09 70°19'54.088 N 148°43'0.45 W 9,712.68 28.28 81.86 8,848.25 2,970.53 24.18 5,972,556.17 658,202.55 70°19'54.099 N 148°43'0.03 W 9,742.59 28.98 74.52 8,874.51 2,973.47 38.19 5,972,559.40 658,216.48 70°19'54.128 N 148°42'59.62 W 9,772.27 30.50 81.25 8,900.29 2,976.53 52.56 5,972,562.77 658,230.79 70°19'54.158 N 148°42'59.20 W 9,802.19 32.97 86.84 8,925.74 2,978.14 68.20 5,972,564.70 658,246.39 70°19'54.174 N 148°42'58.75 W 9,832.43 31.04 86.99 8,951.38 2,979.00 84.21 5,972,565.90 658,262.37 70°19'54.183 N 148°42'58.28 W 9,862.58 26.12 87.61 8,977.85 2,979.69 98.61 5,972,566.89 658,276.76 70°19'54.189 N 148°42'57.86 W 9,892.17 22.92 90.06 9,004.77 2,979.95 110.88 5,972,567.42 658,289.02 70°19'54.192 N 148°42'57.50 W 9,923.03 19.32 94.49 9,033.55 2,979.55 121.98 5,972,567.24 658,300.13 70°19'54.188 N 148°42'57.18 W 9,953.47 15.62 100.05 9,062.59 2,978.44 131.04 5,972,566.32 658,309.21 70°19'54.177 N 148°42'56.91 W 9,981.83 12.23 108.52 9,090.11 2,976.82 137.65 5,972,564.84 658,315.85 70°19'54.161 N 148°42'56.72 W 10,025.00 12.23 108.52 9,132.30 2,973.91 146.32 5,972,562.12 658,324.58 70°19'54.133 N 148°42'56.46 W Projection to TD 10/7/2014 10:50:54AM Page 3 COMPASS 5000.1 Build 61 21 41 03 25 505 RECEIVED bp0 MAR 1 1 2015 AOGCC North America - ALASKA - BP Prudhoe Bay PB G Pad G-01 500292021400 G-01 B Design: G-01 B Survey Report - Geographic 07 October, 2014 FARM BAKER HUGHES yN`eS bP Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-01 Project: Prudhoe Bay TVD Reference: RKB G-01A @ 70.67usft Site: PB G Pad MD Reference: RKB G-01A @ 70.67usft Well: 0-01 North Reference: True Wellbore: G-01B Survey Calculation Method: Minimum Curvature Design: G-01B Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB G Pad,TR-11-13 Site Position: Northing: 5,966,832.87 usft Latitude: 70°18'58.211 N From: Map Easting: 656,301.39 usft Longitude: 148°43'59.01 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.19° Well G-01 API No. 500292021400 Well Position +N/-S 0.00 usft Northing: 5,969,586.00 usft Latitude: 70°19'24.885 N +E/-W 0.00 usft Easting: 658,241.00 usft Longitude: 148°43'0.74 W Position Uncertainty 0.00 usft Wellhead Elevation: 34.97 usft Ground Level: 33.25 usft Wellbore G 018 API no. 500292021402 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2014 9/29/2014 19.63 81.02 57,602 Design G-01 B Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 9497 81 Vertical Section: Depth From(ND) +N/-S +E/-W Direction (usft) (usft) (usft) (1 35.67 0.00 0.00 36.66 Survey Program Date: 10/3/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 108.84 8,106.02 1 :Camera based gyro multisho(G-01) CB-GYRO-MS Camera based gyro multishot 8,170.00 9,497.81 2:MWD-Standard(G-01A) MWD MWD-Standard 9,501.50 9,593.31 INC+TREND(G-01BPB1) INC+TREND Inclinometer+known azi trend 9,622.96 9,742.59 MWD(G-01BPB1) MWD MWD-Standard 9,774.00 9,800.28 INC+TREND(G-01BPB2) INC+TREND Inclinometer+known azi trend 9,830.19 9,860.79 MWD(G-01BPB2) MWD MWD-Standard 9,878.00 9,908.97 INC+TREND(G-01 B) INC+TREND Inclinometer+known azi trend 9,936.97 11,910.28 MWD(G-01B) MWD MWD-Standard 10/7/2014 1:05:48PM Page 2 COMPASS 5000.1 Build 61 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-01 Project: Prudhoe Bay TVD Reference: RKB G-01A@ 70.67usft Site: PB G Pad MD Reference: RKB G-01A @ 70.67usft , Well: G-01 North Reference: True Wellbore: G-01 B Survey Calculation Method: Minimum Curvature Design: G-01B Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-S +E/-W Northing Easting (usft) (°) (°i (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,497.81 39.73 56.70 8,664.38 2,940.04 -80.17 5,972,523.48 658,098.87 70°19'53.800 N 148°43'3.08 W G-01BPB1 TIP 9,501.50 39.88 56.71 8,667.22 2,941.33 -78.19 5,972,524.82 658,100.82 70°19'53.812 N 148°43'3.02 W G-01BPB1 KOP 9,532.57 33.51 61.44 8,692.12 2,950.91 -62.31 5,972,534.73 658,116.49 70°19'53.906 N 148°43'2.56 W Interpolated Azimuth 9,562.61 29.61 66.61 8,717.72 2,957.83 -48.21 5,972,541.94 658,130.44 70°19'53.975 N 148°43'2.14 W Interpolated Azimuth 9,593.31 29.85 72.58 8,744.38 2,963.13 -33.96 5,972,547.54 658,144.58 70°19'54.027 N 148°43'1.73 W Interpolated Azimuth 9,622.96 30.31 79.06 8,770.05 2,966.76 -19.57 5,972,551.47 658,158.89 70°19'54.062 N 148°43'1.31 W 9,654.16 30.01 86.22 8,797.03 2,968.77 -4.05 5,972,553.81 658,174.36 70°19'54.082 N 148°43'0.86 W 9,682.20 28.77 88.87 8,821.46 2,969.36 9.70 5,972,554.70 658,188.09 70°19'54.088 N 148°43'0.45 W 9,712.68 28.28 81.86 8,848.25 2,970.53 24.18 5,972,556.17 658,202.55 70°19'54.099 N 148°43'0.03 W 9,742.59 28.98 74.52 8,874.51 2,973.47 38.19 5,972,559.40 658,216.48 70°19'54.128 N 148°42'59.62 W 9,772.27 30.54 81.23 8,900.28 2,976.54 52.57 5,972,562.77 658,230.80 70°19'54.159 N 148°42'59.20 W G-01BPB2 TIP 9,774.00 30.64 81.60 8,901.77 2,976.67 53.44 5,972,562.92 658,231.67 70°19'54.160 N 148°42'59.18 W G-01BPB2 KOP 9,800.28 37.27 81.70 8,923.56 2,978.80 67.96 5,972,565.36 658,246.13 70°19'54.181 N 148°42'58.75 W Interpolated Azimuth 9,830.19 44.79 82.19 8,946.11 2,981.54 87.39 5,972,568.51 658,265.50 70°19'54.208 N 148°42'58.19 W 9,860.79 52.11 86.70 8,966.39 2,983.71 110.16 5,972,571.15 658,288.22 70°19'54.229 N 148°42'57.52 W G-01B TIP 9,878.00 55.15 90.38 8,976.60 2,984.05 124.00 5,972,571.79 658,302.05 70°19'54.232 N 148°42'57.12 W G-01 B KOP 9,908.97 64.72 90.38 8,992.10 2,983.87 150.78 5,972,572.17 658,328.82 70°19'54.231 N 148°42'56.33 W Interpolated Azimuth 9,936.97 71.51 89.36 9,002.53 2,983.94 176.74 5,972,572.79 658,354.78 70°19'54.231 N 148°42'55.58 W 9,967.57 81.40 85.98 9,009.69 2,985.16 206.42 5,972,574.64 658,384.43 70°19'54.243 N 148°42'54.71 W 10,000.36 93.13 81.73 9,011.25 2,988.67 238.92 5,972,578.83 658,416.84 70°19'54.278 N 148°42'53.76 W 10,030.33 92.85 84.49 9,009.69 2,992.26 268.63 5,972,583.04 658,446.47 70°19'54.313 N 148°42'52.89 W 10,060.24 90.31 88.13 9,008.86 2,994.18 298.46 5,972,585.59 658,476.25 70°19'54.332 N 148°42'52.02 W 10,090.30 90.64 92.35 9,008.61 2,994.06 328.51 5,972,586.10 658,506.29 70°19'54.331 N 148°42'51.15 W 10,120.49 91.60 96.79 9,008.02 2,991.65 358.59 5,972,584.33 658,536.42 70°19'54.307 N 148°42'50.27 W 10,150.31 90.18 101.47 9,007.56 2,986.92 388.02 5,972,580.22 658,565.94 70°19'54.261 N 148°42'49.41 W 10,180.17 87.76 105.36 9,008.10 2,980.00 417.06 5,972,573.91 658,595.11 70°19'54.192 N 148°42'48.56 W 10,210.37 84.65 102.47 9,010.10 2,972.75 446.30 5,972,567.29 658,624.49 70°19'54.121 N 148°42'47.71 W 10,245.23 86.81 99.90 9,012.69 2,966.01 480.40 5,972,561.27 658,658.72 70°19'54.055 N 148°42'46.71 W 10,275.30 89.72 95.62 9,013.60 2,961.95 510.17 5,972,557.84 658,688.57 70°19'54.015 N 148°42'45.84 W 10,305.39 92.03 92.87 9,013.14 2,959.73 540.17 5,972,556.25 658,718.61 70°19'53.993 N 148°42'44.97 W 10,335.43 91.63 88.60 9,012.18 2,959.34 570.18 5,972,556.49 658,748.62 70°19'53.989 N 148°42'44.09 W 10,365.62 94.67 86.24 9,010.52 2,960.70 600.29 5,972,558.48 658,778.69 70°19'54.002 N 148°42'43.21 W 10,395.34 95.16 82.74 9,007.98 2,963.54 629.76 5,972,561.95 658,808.09 70°19'54.030 N 148°42'42.35 W 10,425.41 92.95 80.07 9,005.85 2,968.02 659.41 5,972,567.05 658,837.64 70°19'54.074 N 148°42'41.48 W 10,460.53 90.00 76.89 9,004.95 2,975.03 693.81 5,972,574.79 658,871.88 70°19'54.143 N 148°42'40.48 W 10,490.51 90.43 78.97 9,004.83 2,981.30 723.12 5,972,581.67 658,901.05 70°19'54.205 N 148°42'39.62 W 10,520.37 89.05 82.61 9,004.97 2,986.08 752.59 5,972,587.07 658,930.41 70°19'54.252 N 148°42'38.76 W 10,550.33 86.59 86.11 9,006.11 2,989.02 782.38 5,972,590.64 658,960.13 70°19'54.281 N 148°42'37.89 W 10,580.35 83.63 89.29 9,008.67 2,990.22 812.26 5,972,592.47 658,989.97 70°19'54.293 N 148°42'37.02 W 10,610.17 87.79 91.60 9,010.90 2,989.99 841.98 5,972,592.87 659,019.70 70°19'54.290 N 148°42'36.15 W 10,640.31 89.85 94.63 9,011.52 2,988.35 872.07 5,972,591.86 659,049.81 70°19'54.274 N 148°42'35.27 W 10,670.33 91.29 104.79 9,011.22 2,983.30 901.62 5,972,587.43 659,079.45 70°19'54.224 N 148°42'34.41 W 10,700.51 89.94 109.13 9,010.90 2,974.50 930.47 5,972,579.24 659,108.49 70°19'54.138 N 148°42'33.57 W 10/7/2014 1:05:48PM Page 3 COMPASS 5000.1 Build 61 ra bp Survey Report Geographic BAKER "" HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-01 Project: Prudhoe Bay TVD Reference: RKB G-01A @ 70.67usft Site: PB G Pad MD Reference: RKB G-01A @ 70.67usft Well: G-01 North Reference: True Wellbore: G-01 B Survey Calculation Method: Minimum Curvature Design: G-01B Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 10,732.01 87.85 113.43 9,011.50 2,963.07 959.81 5,972,568.44 659,138.06 70°19'54.025 N 148°42'32.71 W 10,760.17 87.36 117.68 9,012.68 2,950.94 985.19 5,972,556.84 659,163.69 70°19'53.906 N 148°42'31.97 W 10,790.45 89.02 122.09 9,013.64 2,935.86 1,011.42 5,972,542.32 659,190.23 70°19'53.758 N 148°42'31.21 W 10,820.50 90.83 122.19 9,013.68 2,919.88 1,036.87 5,972,526.88 659,216.00 70°19'53.601 N 148°42'30.46 W 10,850.45 89.69 119.22 9,013.54 2,904.58 1,062.61 5,972,512.14 659,242.06 70°19'53.450 N 148°42'29.71 W 10,880.59 90.37 116.16 9,013.53 2,890.58 1,089.30 5,972,498.70 659,269.04 70°19'53.312 N 148°42'28.93 W 10,910.51 91.07 111.94 9,013.15 2,878.39 1,116.61 5,972,487.09 659,296.60 70°19'53.192 N 148°42'28.13 W 10,941.79 90.98 109.05 9,012.59 2,867.44 1,145.91 5,972,476.76 659,326.11 70°19'53.085 N 148°42'27.28 W 10,970.27 89.63 105.09 9,012.44 2,859.08 1,173.12 5,972,468.98 659,353.50 70°19'53.002 N 148°42'26.48 W 11,000.85 86.07 103.79 9,013.59 2,851.46 1,202.71 5,972,461.99 659,383.24 70°19'52.927 N 148°42'25.62 W 11,030.37 86.28 100.74 9,015.56 2,845.21 1,231.49 5,972,456.34 659,412.14 70°19'52.866 N 148°42'24.78 W 11,060.41 85.97 98.55 9,017.59 2,840.19 1,261.04 5,972,451.94 659,441.79 70°19'52.816 N 148°42'23.92 W 11,090.29 86.28 95.82 9,019.61 2,836.46 1,290.61 5,972,448.84 659,471.43 70°19'52.780 N 148°42'23.05 W 11,120.53 85.33 93.38 9,021.82 2,834.04 1,320.67 5,972,447.05 659,501.53 70°19'52.756 N 148°42'22.18 W 11,150.41 85.79 90.36 9,024.13 2,833.07 1,350.44 5,972,446.71 659,531.31 70°19'52.746 N 148°42'21.31 W 11,180.45 88.83 88.37 9,025.54 2,833.40 1,380.44 5,972,447.68 659,561.30 70°19'52.750 N 148°42'20.43 W 11,210.58 89.97 87.85 9,025.86 2,834.40 1,410.55 5,972,449.30 659,591.38 70°19'52.759 N 148°42'19.55 W 11,240.41 90.83 84.87 9,025.65 2,836.29 1,440.32 5,972,451.82 659,621.10 70°19'52.778 N 148°42'18.68 W 11,260.69 90.52 82.64 9,025.41 2,838.49 1,460.48 5,972,454.45 659,641.20 70°19'52.799 N 148°42'18.09 W 11,290.52 90.55 78.93 9,025.13 2,843.27 1,489.91 5,972,459.85 659,670.53 70°19'52.846 N 148°42'17.24 W 11,320.43 91.90 77.73 9,024.49 2,849.32 1,519.20 5,972,466.51 659,699.68 70°19'52.906 N 148°42'16.38 W 11,350.24 95.51 74.28 9,022.56 2,856.51 1,548.05 5,972,474.31 659,728.37 70°19'52.976 N 148°42'15.54 W 11,380.77 94.37 70.66 9,019.94 2,865.67 1,577.05 5,972,484.08 659,757.17 70°19'53.066 N 148°42'14.69 W 11,410.82 90.49 72.76 9,018.66 2,875.09 1,605.55 5,972,494.10 659,785.46 70°19'53.159 N 148°42'13.86 W 11,440.71 90.06 77.32 9,018.52 2,882.80 1,634.42 5,972,502.42 659,814.16 70°19'53.235 N 148°42'13.02 W 11,470.67 92.64 79.95 9,017.81 2,888.70 1,663.78 5,972,508.94 659,843.39 70°19'53.293 N 148°42'12.16 W 11,500.52 89.17 80.97 9,017.34 2,893.65 1,693.21 5,972,514.50 659,872.70 70°19'53.341 N 148°42'11.30 W 11,530.79 90.89 80.63 9,017.32 2,898.49 1,723.09 5,972,519.97 659,902.47 70°19'53.389 N 148°42'10.43 W 11,560.92 90.46 78.23 9,016.97 2,904.01 1,752.70 5,972,526.12 659,931.96 70°19'53.443 N 148°42'9.56 W 11,590.41 93.87 77.43 9,015.86 2,910.23 1,781.50 5,972,532.93 659,960.62 70°19'53.504 N 148°42'8.72 W 11,620.40 95.78 78.24 9,013.33 2,916.52 1,810.72 5,972,539.84 659,989.69 70°19'53.566 N 148°42'7.87 W 11,650.67 94.05 82.57 9,010.74 2,921.55 1,840.44 5,972,545.49 660,019.31 70°19'53.615 N 148°42'7.00 W 11,680.46 91.38 85.77 9,009.33 2,924.57 1,870.04 5,972,549.14 660,048.83 70°19'53.645 N 148°42'6.14 W 11,710.73 89.14 89.16 9,009.19 2,925.91 1,900.27 5,972,551.11 660,079.03 70°19'53.658 N 148°42'5.25 W 11,740.44 89.66 93.04 9,009.50 2,925.34 1,929.97 5,972,551.17 660,108.73 70°19'53.653 N 148°42'4.39 W 11,770.43 88.43 96.70 9,010.00 2,922.79 1,959.84 5,972,549.26 660,138.65 70°19'53.627 N 148°42'3.51 W 11,800.51 88.74 101.13 9,010.74 2,918.13 1,989.54 5,972,545.22 660,168.43 70°19'53.582 N 148°42'2.65 W 11,830.48 87.70 105.61 9,011.68 2,911.21 2,018.68 5,972,538.92 660,197.71 70°19'53.513 N 148°42'1.80 W 11,858.95 87.85 109.79 9,012.78 2,902.56 2,045.78 5,972,530.84 660,224.98 70°19'53.428 N 148°42'1.00 W 11,888.23 89.33 113.76 9,013.50 2,891.70 2,072.95 5,972,520.56 660,252.38 70°19'53.321 N 148°42'0.21 W 11,910.28 91.10 117.46 9,013.42 2,882.18 2,092.83 5,972,511.46 660,272.45 70°19'53.228 N 148°41'59.63 W 11,953 00 91.10 117.46 9,012.60 2,862.48 2,130.73 5,972,492.56 660,310.75 70°19'53.034 N 148°41'58.52 W Projection to TD 10/7/2014 1:05:48PM Page 4 COMPASS 5000.1 Build 61 214103 25 505 RECEIVED b MAR 1 1 2015 p AOGCC North America - ALASKA - BP Prudhoe Bay PBG Pad G-01 500292021400 G-01 B Design: G-01 B Survey Report - Geographic 07 October, 2014 'flu BAKER HUGHES Fr- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-01 Project: Prudhoe Bay TVD Reference: RKB G-01A @ 70.67usft Site: PB G Pad MD Reference: RKB G-01A @ 70.67usft Well: G-01 North Reference: True Wellbore: G-01 B Survey Calculation Method: Minimum Curvature Design: G-01 B Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB G Pad,TR-11-13 Site Position: Northing: 5,966,832.87 usft Latitude: 70°18'58.211 N From: Map Easting: 656,301.39 usft Longitude: 148°43'59.01 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.19° Well G-01 API No. 500292021400 Well Position +NI-S 0.00 usft Northing: 5,969,586.00 usft Latitude: 70°19'24.885 N +E/-W 0.00 usft Easting: 658,241.00 usft Longitude: 148°43'0.74 W Position Uncertainty 0.00 usft Wellhead Elevation: 34.97 usft Ground Level: 33.25 usft Wellbore G-01 B API no. 500292021402 'Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2014 9/29/2014 19.63 81.02 57,602 I Design G-01 B Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 9497.81 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (°) 35 67 0.00 0 00 36.66 Survey Program Date: 10/3/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 108.84 8,106.02 1 :Camera based gyro multisho(G-01) CB-GYRO-MS Camera based gyro multishot 8,170.00 9,497.81 2:MWD-Standard(G-01A) MWD MWD-Standard 9,501.50 9,593.31 INC+TREND(G-01BPB1) INC+TREND Inclinometer+known azi trend 9,622.96 9,742.59 MWD(G-01BPB1) MWD MWD-Standard 9,774.00 9,800.28 INC+TREND(G-01BPB2) INC+TREND Inclinometer+known azi trend 9,830.19 9,860.79 MWD(G-01BPB2) MWD MWD-Standard 9,878.00 9,908.97 INC+TREND(G-01B) INC+TREND Inclinometer+known azi trend 9,936.97 11,910.28 MWD(G-01B) MWD MWD-Standard 10/7/2014 1:05:48PM Page 2 COMPASS 5000.1 Build 61 VS' 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-01 , Project Prudhoe Bay TVD Reference: RKB G-01A @ 70.67usft Site: PB G Pad MD Reference: RKB G-01A @ 70.67usft ,,, Well: G-01 North Reference: True `i : Wellbore: G-01 B Survey Calculation Method: Minimum Curvature Design: G-018 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/4111 Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,497.81 39.73 56.70 8,664.38 2,940.04 -80.17 5,972,523.48 658,098.87 70°19'53.800 N 148°43'3.08 W G-01BPB1 TIP 9,501.50 39.88 56.71 8,667.22 2,941.33 -78.19 5,972,524.82 658,100.82 70°19'53.812 N 148°43'3.02 W G-01 BPB1 KOP 9,532.57 33.51 61.44 8,692.12 2,950.91 -62.31 5,972,534.73 658,116.49 70°19'53.906 N 148°43'2.56 W Interpolated Azimuth 9,562.61 29.61 66.61 8,717.72 2,957.83 -48.21 5,972,541.94 658,130.44 70°19'53.975 N 148°43'2.14 W Interpolated Azimuth 9,593.31 29.85 72.58 8,744.38 2,963.13 -33.96 5,972,547.54 658,144.58 70°19'54.027 N 148°43'1.73 W Interpolated Azimuth 9,622.96 30.31 79.06 8,770.05 2,966.76 -19.57 5,972,551.47 658,158.89 70°19'54.062 N 148°43'1.31 W 9,654.16 30.01 86.22 8,797.03 2,968.77 -4.05 5,972,553.81 658,174.36 70°19'54.082 N 148°43'0.86 W 9,682.20 28.77 88.87 8,821.46 2,969.36 9.70 5,972,554.70 658,188.09 70°19'54.088 N 148°43'0.45 W 9,712.68 28.28 81.86 8,848.25 2,970.53 24.18 5,972,556.17 658,202.55 70°19'54.099 N 148°43'0.03 W 9,742.59 28.98 74.52 8,874.51 2,973.47 38.19 5,972,559.40 658,216.48 70°19'54.128 N 148°42'59.62 W 9,772.27 30.54 81.23 8,900.28 2,976.54 52.57 5,972,562.77 658,230.80 70°19'54.159 N 148°42'59.20 W G-01BPB2 TIP 9,774.00 30.64 81.60 8,901.77 2,976.67 53.44 5,972,562.92 658,231.67 70°19'54.160 N 148°42'59.18 W G-01BPB2 KOP 9,800.28 37.27 81.70 8,923.56 2,978.80 67.96 5,972,565.36 658,246.13 70°19'54.181 N 148°42'58.75 W Interpolated Azimuth 9,830.19 44.79 82.19 8,946.11 2,981.54 87.39 5,972,568.51 658,265.50 70°19'54.208 N 148°42'58.19 W 9,860.79 52.11 86.70 8,966.39 2,983.71 110.16 5,972,571.15 658,288.22 70°19'54.229 N 148°42'57.52 W G-01 B TIP 9,878.00 55.15 90.38 8,976.60 2,984.05 124.00 5,972,571.79 658,302.05 70°19'54.232 N 148°42'57.12 W G-01B KOP 9,908.97 64.72 90.38 8,992.10 2,983.87 150.78 5,972,572.17 658,328.82 70°19'54.231 N 148°42'56.33 W Interpolated Azimuth 9,936.97 71.51 89.36 9,002.53 2,983.94 176.74 5,972,572.79 658,354.78 70°19'54.231 N 148°42'55.58 W 9,967.57 81.40 85.98 9,009.69 2,985.16 206.42 5,972,574.64 658,384.43 70°19'54.243 N 148°42'54.71 W 10,000.36 93.13 81.73 9,011.25 2,988.67 238.92 5,972,578.83 658,416.84 70°19'54.278 N 148°42'53.76 W 10,030.33 92.85 84.49 9,009.69 2,992.26 268.63 5,972,583.04 658,446.47 70°19'54.313 N 148°42'52.89 W 10,060.24 90.31 88.13 9,008.86 2,994.18 298.46 5,972,585.59 658,476.25 70°19'54.332 N 148°42'52.02 W 10,090.30 90.64 92.35 9,008.61 2,994.06 328.51 5,972,586.10 658,506.29 70°19'54.331 N 148°42'51.15 W 10,120.49 91.60 96.79 9,008.02 2,991.65 358.59 5,972,584.33 658,536.42 70°19'54.307 N 148°42'50.27 W 10,150.31 90.18 101.47 9,007.56 2,986.92 388.02 5,972,580.22 658,565.94 70°19'54.261 N 148°42'49.41 W 10,180.17 87.76 105.36 9,008.10 2,980.00 417.06 5,972,573.91 658,595.11 70°19'54.192 N 148°42'48.56 W 10,210.37 84.65 102.47 9,010.10 2,972.75 446.30 5,972,567.29 658,624.49 70°19'54.121 N 148°42'47.71 W 10,245.23 86.81 99.90 9,012.69 2,966.01 480.40 5,972,561.27 658,658.72 70°19'54.055 N 148°42'46.71 W 10,275.30 89.72 95.62 9,013.60 2,961.95 510.17 5,972,557.84 658,688.57 70°19'54.015 N 148°42'45.84 W 10,305.39 92.03 92.87 9,013.14 2,959.73 540.17 5,972,556.25 658,718.61 70°19'53.993 N 148°42'44.97 W 10,335.43 91.63 88.60 9,012.18 2,959.34 570.18 5,972,556.49 658,748.62 70°19'53.989 N 148°42'44.09 W 10,365.62 94.67 86.24 9,010.52 2,960.70 600.29 5,972,558.48 658,778.69 70°19'54.002 N 148°42'43.21 W 10,395.34 95.16 82.74 9,007.98 2,963.54 629.76 5,972,561.95 658,808.09 70°19'54.030 N 148°42'42.35 W 10,425.41 92.95 80.07 9,005.85 2,968.02 659.41 5,972,567.05 658,837.64 70°19'54.074 N 148°42'41.48 W 10,460.53 90.00 76.89 9,004.95 2,975.03 693.81 5,972,574.79 658,871.88 70°19'54.143 N 148°42'40.48 W 10,490.51 90.43 78.97 9,004.83 2,981.30 723.12 5,972,581.67 658,901.05 70°19'54.205 N 148°42'39.62 W 10,520.37 89.05 82.61 9,004.97 2,986.08 752.59 5,972,587.07 658,930.41 70°19'54.252 N 148°42'38.76 W 10,550.33 86.59 86.11 9,006.11 2,989.02 782.38 5,972,590.64 658,960.13 70°19'54.281 N 148°42'37.89 W 10,580.35 83.63 89.29 9,008.67 2,990.22 812.26 5,972,592.47 658,989.97 70°19'54.293 N 148°42'37.02 W 10,610.17 87.79 91.60 9,010.90 2,989.99 841.98 5,972,592.87 659,019.70 70°19'54.290 N 148°42'36.15 W 10,640.31 89.85 94.63 9,011.52 2,988.35 872.07 5,972,591.86 659,049.81 70°19'54.274 N 148°42'35.27 W 10,670.33 91.29 104.79 9,011.22 2,983.30 901.62 5,972,587.43 659,079.45 70°19'54.224 N 148°42'34.41 W 10,700.51 89.94 109.13 9,010.90 2,974.50 930.47 5,972,579.24 659,108.49 70°19'54.138 N 148°42'33.57 W 10/7/2014 1:05:48PM Page 3 COMPASS 5000.1 Build 61 w 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-01 Project: Prudhoe Bay ND Reference: RKB G-01A @ 70.67usft Site: PB G Pad MD Reference: RKB G-01A @ 70.67usft Well: G-01 North Reference: True Wellbore: G-01B Survey Calculation Method: Minimum Curvature Design: G-01 B Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-S +EI-W Northing Easting (usft) (°) (^) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 10,732.01 87.85 113.43 9,011.50 2,963.07 959.81 5,972,568.44 659,138.06 70°19'54.025 N 148°42'32.71 W 10,760.17 87.36 117.68 9,012.68 2,950.94 985.19 5,972,556.84 659,163.69 70°19'53.906 N 148°42'31.97 W 10,790.45 89.02 122.09 9,013.64 2,935.86 1,011.42 5,972,542.32 659,190.23 70°19'53.758 N 148°42'31.21 W 10,820.50 90.83 122.19 9,013.68 2,919.88 1,036.87 5,972,526.88 659,216.00 70°19'53.601 N 148°42'30.46 W 10,850.45 89.69 119.22 9,013.54 2,904.58 1,062.61 5,972,512.14 659,242.06 70°19'53.450 N 148°42'29.71 W 10,880.59 90.37 116.16 9,013.53 2,890.58 1,089.30 5,972,498.70 659,269.04 70°19'53.312 N 148°42'28.93 W 10,910.51 91.07 111.94 9,013.15 2,878.39 1,116.61 5,972,487.09 659,296.60 70°19'53.192 N 148°42'28.13 W 10,941.79 90.98 109.05 9,012.59 2,867.44 1,145.91 5,972,476.76 659,326.11 70°19'53.085 N 148°42'27.28 W 10,970.27 89.63 105.09 9,012.44 2,859.08 1,173.12 5,972,468.98 659,353.50 70°19'53.002 N 148°42'26.48 W 11,000.85 86.07 103.79 9,013.59 2,851.46 1,202.71 5,972,461.99 659,383.24 70°19'52.927 N 148°42'25.62 W 11,030.37 86.28 100.74 9,015.56 2,845.21 1,231.49 5,972,456.34 659,412.14 70°19'52.866 N 148°42'24.78 W 11,060.41 85.97 98.55 9,017.59 2,840.19 1,261.04 5,972,451.94 659,441.79 70°19'52.816 N 148°42'23.92 W 11,090.29 86.28 95.82 9,019.61 2,836.46 1,290.61 5,972,448.84 659,471.43 70°19'52.780 N 148°42'23.05 W 11,120.53 85.33 93.38 9,021.82 2,834.04 1,320.67 5,972,447.05 659,501.53 70°19'52.756 N 148°42'22.18 W 11,150.41 85.79 90.36 9,024.13 2,833.07 1,350.44 5,972,446.71 659,531.31 70°19'52.746 N 148°42'21.31 W 11,180.45 88.83 88.37 9,025.54 2,833.40 1,380.44 5,972,447.68 659,561.30 70°19'52.750 N 148°42'20.43 W 11,210.58 89.97 87.85 9,025.86 2,834.40 1,410.55 5,972,449.30 659,591.38 70°19'52.759 N 148°42'19.55 W 11,240.41 90.83 84.87 9,025.65 2,836.29 1,440.32 5,972,451.82 659,621.10 70°19'52.778 N 148°42'18.68 W 11,260.69 90.52 82.64 9,025.41 2,838.49 1,460.48 5,972,454.45 659,641.20 70°19'52.799 N 148°42'18.09 W 11,290.52 90.55 78.93 9,025.13 2,843.27 1,489.91 5,972,459.85 659,670.53 70°19'52.846 N 148°42'17.24 W 11,320.43 91.90 77.73 9,024.49 2,849.32 1,519.20 5,972,466.51 659,699.68 70°19'52.906 N 148°42'16.38 W 11,350.24 95.51 74.28 9,022.56 2,856.51 1,548.05 5,972,474.31 659,728.37 70°19'52.976 N 148°42'15.54 W 11,380.77 94.37 70.66 9,019.94 2,865.67 1,577.05 5,972,484.08 659,757.17 70°19'53.066 N 148°42'14.69 W 11,410.82 90.49 72.76 9,018.66 2,875.09 1,605.55 5,972,494.10 659,785.46 70°19'53.159 N 148°42'13.86 W 11,440.71 90.06 77.32 9,018.52 2,882.80 1,634.42 5,972,502.42 659,814.16 70°19'53.235 N 148°42'13.02 W 11,470.67 92.64 79.95 9,017.81 2,888.70 1,663.78 5,972,508.94 659,843.39 70°19'53.293 N 148°42'12.16 W 11,500.52 89.17 80.97 9,017.34 2,893.65 1,693.21 5,972,514.50 659,872.70 70°19'53.341 N 148°42'11.30 W 11,530.79 90.89 80.63 9,017.32 2,898.49 1,723.09 5,972,519.97 659,902.47 70°19'53.389 N 148°42'10.43 W 11,560.92 90.46 78.23 9,016.97 2,904.01 1,752.70 5,972,526.12 659,931.96 70°19'53.443 N 148°42'9.56 W 11,590.41 93.87 77.43 9,015.86 2,910.23 1,781.50 5,972,532.93 659,960.62 70°19'53.504 N 148°42'8.72 W 11,620.40 95.78 78.24 9,013.33 2,916.52 1,810.72 5,972,539.84 659,989.69 70°19'53.566 N 148°42'7.87 W 11,650.67 94.05 82.57 9,010.74 2,921.55 1,840.44 5,972,545.49 660,019.31 70°19'53.615 N 148°42'7.00 W 11,680.46 91.38 85.77 9,009.33 2,924.57 1,870.04 5,972,549.14 660,048.83 70°19'53.645 N 148°42'6.14 W 11,710.73 89.14 89.16 9,009.19 2,925.91 1,900.27 5,972,551.11 660,079.03 70°19'53.658 N 148°42'5.25 W 11,740.44 89.66 93.04 9,009.50 2,925.34 1,929.97 5,972,551.17 660,108.73 70°19'53.653 N 148°42'4.39 W 11,770.43 88.43 96.70 9,010.00 2,922.79 1,959.84 5,972,549.26 660,138.65 70°19'53.627 N 148°42'3.51 W 11,800.51 88.74 101.13 9,010.74 2,918.13 1,989.54 5,972,545.22 660,168.43 70°19'53.582 N 148°42'2.65 W 11,830.48 87.70 105.61 9,011.68 2,911.21 2,018.68 5,972,538.92 660,197.71 70°19'53.513 N 148°42'1.80 W 11,858.95 87.85 109.79 9,012.78 2,902.56 2,045.78 5,972,530.84 660,224.98 70°19'53.428 N 148°42'1.00 W 11,888.23 89.33 113.76 9,013.50 2,891.70 2,072.95 5,972,520.56 660,252.38 70°19'53.321 N 148°42'0.21 W 11,910.28 91.10 117.46 9,013.42 2,882.18 2,092.83 5,972,511.46 660,272.45 70°19'53.228 N 148°41'59.63 W 11,953.00 91.10 117.46 9,012.60 2,862.48 2,130.73 5,972,492.56 660,310.75 70°19'53.034 N 148°41'58.52 W Projection to TD 10/7/2014 1:05:48PM Page 4 COMPASS 5000.1 Build 61 STATE OF ALASKA P (A OIL AND GAS CONSERVATION COM. ON • REPORT OF SUNDRY WELL OPERATIONS 1 Operations Abandon❑ Repair Well ❑ Plug Perforations ❑ Perforate Other 0 Pull LTP Performed. Alter Casing❑ Pull Tubing ❑ Stimulate-Frac ❑ Waiver Time Extension❑ Change Approved Program❑ Operat Shutdown❑ Stimulate-Other ❑ Re-enter Suspended WE 2 Operator 4 Well Class Before Work 5 Permit to Drill Number. BP Exploration(Alaska),Inc Name Development 0 Exploratory❑ 214-103-0 3 Address. P O Box 196612 Stratigraphic ❑ Service❑ 6.API Number: Anchorage,AK 99519-6612 50-029-20214-02-00 7 Property Designation(Lease Number) 8.Well Name and Number. ADL0028280 PBU G-01 B 9.Logs(List logs and submit electronic and printed data per 20AAC25 071) 10 Field/Pool(s): PRUDHOE BAY,PRUDHOE OIL 11 Present Well Condition Summary RECEIVED Total Depth measured 11953 feet Plugs measured None feet MAR 0 5 2015 true vertical 9012 6 feet Junk measured None feet Effective Depth measured 11910 feet Packer measured 7734 feet AOGCC true vertical 9013 43 feet true vertical 7042 84 feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"x 30" 27-107 27-107 0 0 Surface 2667 13-3/8"72#N-80 26-2693 26-2692 73 4930 2670 Intermediate None None None None None None Production 8188 9-5/8"47#N-80 27-8215 27-7459 49 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 10705-11155 feet 11305-11740 feet 11830-11909 feet True Vertical depth 9010 92-9024 45 feet 9024 91-9009 5 feet 9011 66-9013 45 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and true vertical depth) 7"Liner Top Packer 7734 7042 84 Packer None None None SSSV 12 Stimulation or cement squeeze summary Intervals treated(measured) 5CANNE10 'N;:2;: ° ,- ,,- Treatment descnptions including volumes used and final pressure 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 269 5116 6 1400 235 Subsequent to operation 591 16231 14 1600 1414 14 Attachments: 15 Well Class after work Copies of Logs and Surveys Run Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16 Well Status after work Oil 0 Gas ❑ WDSPL ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ❑ SUSP ❑ SPLUG ❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C.O.Exempt. N/A Contact Garry Catron Email Garry.Catron(. BP.Com Printed Name Garry Catron Title PDC PE Signature c,r_,t„ l Phone 564-4424 Date 3/5/2015 "-'"-_If/ 1/T— 3 /////, RBDMSSk MAR - 6 2015 Form 10-404 Revised 10/2012 Submit Original Only p, 0000000 c° N N r" COI- IO O O O � CO O C N 0 e 0000000 CO CO O I� M M CO • A— A— COC‘I 0) Tr Q m O CO CO O c CO 0) co CO O 0 O O N 01 N t O x_ N. co LC) C) C`) C) 0) CO 0 At CO CO O O N CO N Act CO CO CO l0 N co M N CO M CO 0 0) (O I� N- CO 14) LO 00 0) AT COO O co 00) OND N M C.) 0 ammoCO 0 N r- NU) U) N- CD0AT N N � ca m N N M Co 0 3 J NC 9 N 10 0D 0 cD000DZJJC) oUJZNocnzM4* 4# CDN X _ ao N CI3N N N 0\0 CO M N N A 1— N 0) CO t C COC) OD O a- co Cl) —NON 0) Z rnp 0 W N• O U V o W W W o � Z Z Z W W W Q w m m Q Z Z Z W D O D O O C/) H H • w a D f = o / . a I - 6 2§ / D CD \ (-3 7 CD _ C \ k * C / 1 / E - / O 2 - f1 r ± / CD o % -J cn / / - o 11 ( 2 pƒ D c -o e I m % _i22 f 77 / % -/ b - m / % ƒ � ® $ \ R � O _ m 22 Cl) \ % I i H H % 2 / E C x & ( @ q / RO \ R ( D OD @/ Z (N I- _iD 0 - o 7 § / _Z O $ 0 \ O H coa' f § � am � / _ _ 0C . �4 HI Lii \H 7 . f 2 0 ± t 0 K\ D k k k k k k _ D '-� ct 0 Z � � / fJ ( (r) ( C - - L° °30 ° 20 re > - cn . u) ` � AI � � - G & \ 4 « 2 u- 2 3 ƒ 01 ? \ \ $ \ 61 S & a / I2 ® 'CU « q & & & / » f 2 w I \ _ Cl_ O Zcv( II + 2 -- -I � � c >ct 21v- f / � < DDD0E- -o � " � w -- co x I- D � / \ / _ / �� / = IL 'IDO _ 65 HHwe Eo � I ® _i \ I u / » Z / I ® $ Z I D o % % \ LLI H LU H LU < ZZZ $?O ODo5 : e Z 4 « « « - o o 2 - m ± _ CL - : < D 2 ± 2 : & = O = : I a & 2 : m in r in / / \ \ / \\ CV \ < TREE== 4-1/16"CMV S. f NOTES: W ELL V _HEAD MG-O 1 B 7"LNR(PARTIAL CHROME))**E MAX DOGLEG: 38° ACTUATOR= BAKER OKB.E.EV= 61.83' I 110000**' BF.ELEV= 26.86' KOP= 3206' 2170' —13-1/2"OTS XBD SSSV LAND NP,D=2.75" Max Angle= 96°@ 11350' —"SOF. MEM 0 Datum MD= 9738' #, Datum TVD= 8800'SS 1)= t 2186' —19-5/8"FOC 2691' --j 9 5✓8"DV F1CR 13-3/8'CSG,72#,N-80 BUTT,D=12.347" 2693' _ Minimum ID = 1.78" @ 9464' GAS LFT MA S WIPER PLUG BUSHING ST MD TVD DEQ/ TYPE 0M' LATCH PORT DATE IN DEPLOY SLEEVE 2 4377 4260 37 MMG DOME RK 16 10/13/14 1 7182 6570 32 MMG *DMY RK 0 05/04/14 IVIZi1 *STA#1=DMY BEHIND CEMENT E STMA 1 E D TOP OF CEMENT 1 —5800 E TOP OF T LNR 7727' o'II 0,4"•1‘..7",,, 7727' H9-5/8"BKR TIEBACK SLV,D=7.50" . 7734' —9-5/8'X 7"BKR LW BEHIND I�N4 BHYDHGR,D=6.188" CEMENT OP 04, 9-518"CSG,47#,N-80 BUTT,D=8.681" H 9174' I1 N `I II `004 I`�C, ,'; 9-5/8'MLLOUT WINDOW(G-01A) @ 8170'-8215' ' 4, '10�♦ I‘j id 'I� 1 ISI 'I1 r LNR,29#,NT-80 XO 13C12 80 NSCC -{ 8755' IF ' TOP OF 2-3/8"LNR/CMT 9455• ` 9455` 2.70"BKR DEPLOY SLV,D=225" IIti sei!, � w i WIPER PLUG BUSHING @ 9464',ID=1.78" irit I_F'I� � � 9466' —12-3/8"BTT PUP JOINT,D=1.995" 3-1/2'WHPSTOCK(09/14/14) 9504' 1 'j t 3-1/2"TBG,9.2#,L-80 TDS, — —9504 ,"-Ii_.,1 lb, 1,, Aci,\ 41 \" MLLOUT WINDOW(G-01 B) @ 9504'-9513' .0087 bpi,D=2.992' —.,I. #� 40, a • \ 10283' —12-318"PUPw/RA PP TAG `4\ 11020' —12-3/8"RP w/RA PP TAG ►—. ►_. .� 44 .44 7"LNR,29#,13CR 80 NSCC, 10118' 0371 bpf,D=6.184" ' �ro,. �C'4, \a PERFORATION SUMMARY ,:"+R, 4 ilb REF LOG:BKR RFM ON 10106/14 ANGLE AT TOP PE7F: 90°@ 10705' PBTD(TAGGI3)1 010 7114) H 11910' � .,t'- Note:Refer to Roduction DB historical perf data `�� SCE SPF INTERVAL OPWSOZ SHOT SQZ + 1.56" 6 10705-11155 0 10/07/14 2-3/8"LNR 4.7#,L-80 TH511, — 11945' 1.56" 6 11305-11740 0 10/07/14 .0039 bpf,D=1.995' 1.56" 6 11830-11909 0 10/07/14 DATE REV BY COMMENTS DATE REV BY COMuENTS PRU)HOE BAY EMT 06/18/76 RIG 36 ORIGINAL COMPLETION 10/30/14 NS/PJC FINAL ODE APPROVAL WELL: 6-018 12/18/93 D-14 SIDETRACK COMPLETION 11/04/14 NS/J1,43 REMOVE P8TD(LAN INGCOLLAR) PERIATNo:`2141030 10/08/14 NORDIC 1 CTD SIDETRACK 02/02/15 MG/PJC'PILL KB LW AR No: 50-029-20214-02 10/14/14 PJC DRLG HO CORRECTIONS SEC 12,T11N,R13E,2063'FNL&19745 FEL 10/15/14 MJC/PJC GLV C/O 8 SET LTP(10/13114) 10/20/14 MI PJC Rev BDW Corrections BP Exploration(Alaska) CD 0 0 • e C•1 = W_ pl W =1 _W cV o a co EI J EI Y m LLI O J COI J 0 J .0 N '� O _ N Z 'c W Z LLI Z > x UI 11 Z `° N _U c1 t NI Li. EI Z LLI 0 O. X I Li EI co mU) 0 Z 0 CO m LLI CO a) a) o a) O U z p DO 0 I I CO Co co Cl) Y• CD a 7 I z ',, 0 v v v m m m m F @ a0 v F. 2 O O O c c c c 0 —I S 2 O ITo In' Tr N N N it LL LL LL I M 0 I Tr N 4 o 2 m O I- U U CO CO CO _m m m I CO I m O U O N Q Q O O O O O I O O O N 0 J c a C.0 t22 t88 Chou- 0 C9 (9 0 has 0 0 UU UM2 V p o c ai co ai raI ai a)I LL ai 01 a ai ai ai ai ai ai '6 ai ui OM ai y1:; Z 0 a) LL OI LL C E LL c2 d 11 Y LL LL LL LL ii a LL LL it O ll F- Y E 0 0) 0 I 0 IY 0 IU 0 0 0 0 � :° C 0 0 NI .010 N E 'c a) c 'c 'c c 'c 'c c 'c ,nI 'c c c o c co @ co 0 2 2U= 2UU 2U= 0 0 0 0 oN 2 2 2 oU=1 Jco o J 0 a)Vr m 7 mI ml N ml I 7 mI mI 0 0 0 0 a)mI N N N 0 1- N m1 mI Ce Q EO W I o W O p W O m WOO W W W W W O W W W IU W O 0 OmU a) > 0 O O O O O O O O O O O O LU d @ @ N N N N N N N N N N N N N a R C V V V V R R R Tr V V O YO d N N N N N N N N N N N N N IXJ fY N N N N N N N N N N N N N O. LU W 0- 0,' J 2 = o m o 00 Z o 8 Qa a) c is co o• co \ Om 0 U 0 m ino Z1 ` w r co O • " O 0 ON t.{ a a) • N E a E Tr0 co c Q m � Z 0 c au ca a. cb 2ca I— CC 00 5 z O J2 G = N -J it 0 d COa m O 0 0 f0 O o 0 cco n p W Q as o a) a) Q c d a z°I 0 0 z ° o 0 o p EJ @ 2 Z 7 @ @ @ @ as @ CO CO CO CO CO CO @ N a) CO CO @ CO @ (o @ To as @ @ @ @ co c E ° 0 0 0 0 0 0 0 0 0 0 0 0 rnZ m @ @ @ CO CO CO CO CO m m m m 0 _m _m 0) 0) 0) _m _m 01 0) 0) 0) 0) 0) O 0 z O _ p p p p p p p p p p p p p co > 0 J « a) Zr) r h r N- N- N- N- N- N- N- I-- I-- r 0 I- p N j2 M M M M co co co co M co co M co a Z . c 0 W 7 ca E LU in to to IL) IL) 110 11.0 1Tr U LU U U L N 2 0 0 0 W 0 z N N N N N N N N N N N N N b. 0 Q o @ LL 0 6 _ c 2 0 0 0 0 U U U U U U U U 0 ix z 5 4 w J a as 0 F0. ° G d a): 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 wF3 � 0I LU w w w w w w w w w w w g O • e 1 • I o 9 0 c 0J N1 m Ol m 01 . . 00 OJ c o M 0 W I W I W I . N -p Li) I W ,L N Z WI 0 0 W J1 W JI >. >.cp >, >, W JI 2 0 O 0 2 JI Z JI Z Z Z Z Z ` • yo JI _Zcs 0 a 0 0 0 Q LL1 Q LLz1 � M CO cn Y 7 Q 'L1 c b a)O ~ H aj UI LL co LL c 'Co c c H � 7 LL Cl)C Z E0I j j mw _ 01 _0 _ 01 0 LL LL LI E _I 01 01 DI 0 C C- I- 2 Q m J Q Q a)LL w m m m 1 mm.1 ERR m m = coca 1 m 1 lL W M M it_1 N c0 ,- m a co c- 00.- 00 00 CO 00 cl c 00 _m r Ofl ,- -LL W LU -Q Y o 0 0 o co O O t I w 0 0 3 Z F O N O N O N O N O O O O w 0 9 9 N 9 N J (n Q 1• I 2 (n it U O W 0 W 0 W 0 W 0 0 0 0 0 a 0 y 0 ow 0 W 0 O ? 0 m 00 I=1 ai v ..v c ai v ai co LL as ai ai ai ai 2I aim ai ai v ai v w IO it c`l DIUd cn d cn -11.4.1 Iml .co_ w1 o wI�U• o WILL c) wla 0 c) NI c)�1 cv v wl c) (n c Ti Ow O� c� � c c N F c �Cl E .1_ 'c 'c 'c 'c 'cam c - c 'c a) c a)� N CO °�l ml o p o W0 o a N o CC m o�I0 o tY1 LL o WI0 0 0 0 0 0 m o m o o�I o�i 0 I— 4 cn Immo vW �W aa))mw (DOI a1.0)O=1 a0)QH (Dots m aI a)) aa)) aa)) aa)) as aa))m aa))ti a)OH a. oI ,„- WON N 2 N 2 W O M W IO W 103 W IO W Im W LU LU LU W O W o W W IU W Ica OZ �� to Ln in in Lo O cnLo Lo Lo u7 a 0 0 0 0 0 0 00000 0 00 0 W d N N N N N N NNNNN N --- N N N V V V R V V V V V V 7 IX N N N N N N NNNNN N N N N O N N N N N N N N N N N N NN N 0. w w d J 0 m o Zz5 — M Lo Q .0 to N ` w O 0 0 00 N J a as a o co toO ;7o 0 0 N r 6 o) O) Oc C-%-,1 o- E UM `., 0 J m Q N- 9 O aD 0. r t I . ~ ,- S Z 0 G m N M Q CO W m o 0 a) ' CO o (6 0 Q a oo a) Q ci 0 Z o d w w C C Eco co 0 Z V) U) a) N N co co co co a) CO CO CO CO CO a) a) CO CO a) co D 0 co a) co a) a5 CO @ CO CO a) OS MM co CO 0 CO cu ai 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O as 2 I a) co co a) CO CO CO CO CO CO a3 ns a7 as rn rn 0 0 0_) 0) o) 0) 0) 0) _rn 0) 0) rn 0)_ _0 _rn 0) 0 D J J 0 0 0 0 0 00 O O O 0 0 0 M > N- N- a) co co op co co ao co W co a) co WW CO 0 I- co co co co co co co co co co co co co co mm CO V V a V 7 • V a) V V V V V Ln L() to to In to to L!') to in co In to Ln l() t() LO C71 N N N N N N N N NNNNN N NN N N F M 0 to m .2U U 0 U 0 0 U 0 0 0 0 0 0 0 0 0 0 0 L) £ 0 d 0 0 0 0) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 2 w J J w w w LU LU LU LU LU LU LU W LU LU LU ti- • p . - p I I 0 I • 0 N N Co 0I m 01 I 0I NI 0 c N0 01 LU 01 W > -o o DI LU H N LT_ co U N o Z LU JI w JI T > >. >. W JI O 4. 2 T _U LL Q LL < OS OS OS OS • a LL < d m N 2 JI Z JI Z Z Z Z Z co JI Z 2 0 Co o Q �I Q LII to (nn <n <n Y I- a Q LT_ O 0 c N LL co LL co C C C C 0 H 7 LL W N 0I Z Z 0I 0 CI 0 it it it it I UI oI 01 0 E J 2 Co MI CO~I CO MI CO~I Co CO CO Co co = CO Co I �I CO E-I N LL N Q d v Cl_ v a v a v d d d d CO a av av I@ Co m_0 Co '- mo mo CO Co_ CO_ _m 03 cI CO mo Co_o iiQ w O N O N O SN_ O N O O O O N CO O O N O N 5 Z H O J 0 W O w U U W 0 0 0 0 U' o. 0 a 0 0 W O w (n it 0 2 Vui co ui ai 2 ai LL ni ui as ai hi Sg ui ai gi ui co co0I=I co - `- LL. N it(NJ V1 it CN it (NI it it it it. LLo it I LL LLN LLN 0 co ce w Y y cc) 0 0IY U UILL U NIY 0 c3 0 c3 c3 NI c3 u)I 0 U NI 0 (0 °-jIvI d cn 0 2 oI 2 IL) O 0- Off0 0 0 0 0 EN Om 2 2 Off~ Om0 MW E _i I�? IU I� U itr-- N _O0 r < Cl) i�� Y i��_I i�wY i��_I o c� 0a �� �� Y ��_I Baa ¢ o N a�0 � a�0= co 0� a�02 CD a� m m aim_ aim_ a) CD 0I- m(�2 .?,_w aw 0 ce a y W I0 W ICa W I0 W Im W W W W W O W O W W I0 W Im W O co N 2 O 0 O '5 O O.w U Q a e 0 0 0 0 0 0 o o o 0 o o o o E in E W N N N N NNNNN N N N N N co Cr V . R �t V V V (n Z Ce N N N N N N N N N N N N N N O N N N N --- N --- N N N N N N N a w w 9- J 0 U m o71) z p O 0 Q co VS Lo O N 0 O o. coo 5� ° u0 to G 0 N O Cl) T.. '1 O) Oc N o- N E UM0 71- o —I m rn Q 9 f6 p a l" 0 a o I— Z v • O CON 00 Q00 a3 m com O co 0 0 N Q a ° m Q o a 0 m Z E U N E m co 0 z (I) co co co CO 03 CO CO N CO 03 CO CO co c0 N d co co co co CO CO CO CO CO CO CO CO CO CO V 01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N E Oo co co co co co co 03 00 S To To CO CO I 0 c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 _1 E c > 03 03 03 03 C) 03 03 03 0) 03 03 03 03 03 03 0 co co co co co co co co co co co co co co co a ~ VV V V V V 7 .1 Q V V V 7 V o N o to LU C71 N N N N NNNNN N N N N N N N N a cu - E E co co co D La Cl z p N v w - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 G J V 41 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m -Tv ¢ a. M W W W W W W W LU W W W W W W J 0 o 0 N 1 fV `i® (;) N Z N co mt o d o) < I' I k I c z a o z \�. U a m \' o o 20 o 0J U 0 J J V P Z ^ 11 N } 6C)>_ c. I— J co mN 0 I Ce < a O LL /O 0 7 0 �o co 1 . e O) 63p 1.1.1IX 0p O. a E W Wrn N J N O) O_ V a.• O E co Z _ Q o O N c. N ` y J a . J7 o v E ••=. ii= to o O N N O VN o w M 0 (� m ,i- ,.... J m `� } 0 E Q 9 o O vO. � co 5 = co o 2 G N I (0 —C fo CO m o ~ E WY 7 O O Cw Cl) p co c o p toD Iklii 1 ICC D re • a Co m @ ' ;E ° .g c Otrz as .z ' 0o ' 2o -cis z a) v co o Z N 0 00 °' o p o• c O M W m o i– W E a O 1 co reo N UJ I. 11 d Q: °o N = Z N N cc .` co 0 a' H ,- V a O C y D H C Z C COO N V o Q O gQ O p • C U • m o .2 a m N E a c. E LL o 0 2 E w d E 1 E d a _ 0 a 0 0 0 c 0o 0 214103 r4ECEIVED FEB 24 2015 Letter of Transmittal Mkt AOGCC Date: DATA L,Q�END R GED BAKER February 24, 2015 212015 HUGHES M K B To: From: State of Alaska, AOGCC Jesse Salyer 333 West 7th Ave, Suite 100 Baker Hughes INTEQ Anchorage, Alaska 99501 795 East 94th Avenue Anchorage, Alaska 99515 jesse.salyer@bakerhughes.com Please find enclosed the final well data for the following well(s): Wel • • G-01B 4 • G-01BPB1 2 5 4 3 8 • G-01BPB2 25 439 Enclosed for each well(s): 1 hardcopy print of final logs • 2MD, 5MD & TVDSS 1 compact disk containing final field data • CGM • PDF • SURVEY • TIFF • LAS • TAPESCAN iI ( 03 Hunt, Jennifer L (DOA) From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Wednesday, November 19, 2014 10:16 AM To: Hunt,Jennifer L (DOA) Subject: PBU G-01B/ PTD# 214-103 Hi Jennifer, Please reference the following well: Well Name. PBU G-01 B Permit#: 214-103 API #: 50-029-20214-02-00 Date of Test: 11/15/14 Type of Test: IPT (Initial Production Test) Choke Size: 96 Choke Unit: Deg Production Method: Flowing Duration (Hours Tested): 6 Top Reference (Top Perf MD): 10705' Bottom Reference (Bottom Perf MD): 11909' Tubing Flowing (Pressure): 200 Casing Pressure. 1720 Total Test (Rate f/O, W, G): 1745/4/ 1436 24-Hour Rate (0, W, G): 701 / 16 /5744 Gravity (Oil, API): N/A GOR (Gas-Oil Ratio): 8194 This well began Production on: November 13, 2014 Method of Operations on this date: Flowing RBC MS NOV 19 2016W RECEIVED STATE OF ALASKA NOV 0 7 2014 • ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOGhr( 1a. Well Status: , ®Oil El Gas 0 SPLUG ❑ Other 0 Abandoned El Suspended 1b. Well Class 20AAC 25 105 20AAC 25 110 ❑ Exploratory El Stratigraphic ❑ GINJ ❑WINJ ❑WAG 0 WDSPL El Other No.of Completions One r ® Development ❑ Service 2. Operator Name 5. Date(Comp,Susp.,or Aband.: 12. Permit to Drill Number BP Exploration (Alaska) Inc. 10/8/2014. 214-103 3. Address: 6. Date Spudded: 13. API Number P.O. Box 196612,Anchorage,Alaska 99519-6612 9/22/2014 • 50-029-20214-02-00 • 4a. Location of Well(Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 10/2/2014 , PBU G-01B 2063' FNL, 1974' FEL, Sec. 12,T11N, R13E, UM 8. KB(ft above MSL): 70.67' • 15. Field/Pool(s) Top of Productive Horizon: 920' FSL, 1858' FEL, Sec. 01, T11N, R13E, UM GL(ft above MSL): 33.25' Prudhoe Bay/Prudhoe Bay Total Depth: 9. Plug Back Depth(MD+TVD) 799' FSL, 156' FWL, Sec. 06,T11N, R14E, UM 11910' 9013' ' 4b. Location of Well(State Base Plane Coordinates, NAD: 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 658241 - y- 5969586 - Zone- ASP4 11953' 9013' • ADL 028280&028304 TPI: x- 658294 y- 5972571 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth: x- 660310 y- 5972493 Zone- ASP4 None 18. Directional Survey: ®Yes 0 No 19.Water depth, if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD/GR/RES, GR/CCL/RPM 9504' . 8669' • 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20"x 30" Insulated Conductor 27' 137' 27' 137' 36" 270 cu ft 13-3/8" 72# N-80 26' 2693' 26' 2693' 17-1/2" 6276 cu ft 9-5/8" 47# N-80 25' 8170' 25' 7420' 12-1/4" 1400 cu ft Howco Lite,250 cu ft Class'G' 135 cu ft Permafrost'C' 7" 29# NT-80 13Cr80 7727' 9504' 7037' 8669' 8-1/2" 93 Bbls Cement 2-3/8" 4.7# L-80 9450' 11945' 8627' 9013' 3" 57 sx Class'G' 24. Open to production or injection? ®Yes 0 No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD) (MD+TVD of Top&Bottom; Perforation Size and Number): 1.56"Gun Diameter,6 spf 3-1/2", 9.2#, L-80 9504' None ..a- 26. ACID,FRACTURE,CEMENT SQUEEZE, ETC. 10705'-11155' 9011'-9024' L.,‘,3119 • WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ® No 11305'-11740' 9025'-9010' 11830'-11909' 9012'-9013' ' '1 3 DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED •.< 2500' Freeze Protect w/22 Bbls 60/40 Methanol Water 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ® No . Sidewall Core(s)Acquired? 0 Yes ® No If Yes to either question, list formations and intervals cored(MD+TVD of top and bottom of each), and summarize!Ethology and presence of oil,gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None Form 10-407 Revised 10/2012 v Ti_ z/G/i 5- CONTINUED ON REVERSE ,.4- Submit Original Only At 77/(?4, '''- 21' RBDMS 1JAN - 6 2015L� 29. GEOLOGIC MARKERS(List all formations and ers encounter 30. FORMATION TESTS NAME ND Well Tested? (es ®No • Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. CGL-Zone 3 9535' 8694' None Base of CGL-Zone 2C 9602' 8752' 23SB-Zone 2B 9654' 8797' 22TS 9718' 8853' 21 TS-Zone 2A 9809' 8930' Zone 1B 9868' 8971' TDF-Zone 1A 10870' 9014' Zone 1B(Invert) 11392' 9019' Formation at Total Depth: Zone 1B(From Base) 11392' 9019' 31.List of Attachment. Summary of Daily Drilling Reports,Summary of Post-Rig Work,Well Schematic Diagram, Surveys,Cement Report 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Nathan Sperry,564-4258 Email: Nathan.Sperry@bp.com Printed Name: Title Drilling Technologist Joe Lastu Signature: \ / Phone 564-4091 Date: 411/1 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a. Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13. The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27• Method of Operation. Flowing,Gas Lift, Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28. Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071 Form 10-407 Revised 10/2012 Submit Original Only TREE= 4-1/16'Cita ' WELLHEAD= M1cEVOY G-O 1 B S7AF ARTIAL OTES: c ROME ANGLE ELL MAX DOGLEG: 38° Aq?TUATOR= BAKER OKB.ELEV= 61.83' I 110000*'• BF.REV= 2686' KOP= 3206' " ? Q 2170' H3-1/2"OT1S XBD SSSV LAND MP D=2.75" Max Angle= 96 C� 11350' — I Datum M)= 9738' #. , Datum TVD= 8800'SS D" f 2691' 9518"DV PKR 2186' H 9-5/8"FOC �[ 13-3/8"CSG,72#,N-80 BUTT,D=12.347" —{ 2693' Minimum ID = 1.78" @ 9464' I GAS LFT MANDRELS WIPER PLUG BUSHING Sr M) TVD DEV TYPE DMY LATCH PORT DATE IN DEPLOY SLEEVE ' 2'4377 4260 37 MIG DOME RK 16 10/13/14 1 7182 6570 32 NAG *My RK 0 05/04/14 *4.. .t *STA#1=OM3BI Y 1ND CENB4T .. ESTIMATE/TOP OF GEIIABVT —i —5800 +r IPS TOP OF 7"LNR —{ 7727' —� 4 v 7727' 9-5/8"BKR TIEBACK SLV,D=7.50" y y4. i 1, IVO 7734' —9-5/8"X 7"BKR LTP BEHIND P. r &HYD HGR,D=6.188" CEMENT y 9-5/8"CSG,47#,N-80 BUTT,D=8.681' 4 9174' I ,I �i I'III 46 IIIII "...dde �'� 9-5/8"MLLOUT WINDOW(G-01A) @ 8170'-8215' tki 4010,eV`!� . 4 7"LNR,29#,NT-80 XO 13CR 80 NSCC H 8755' P.. . 9450• --�3 112"BKR KB LTP,D=1.81"(10/13/14) 25 TOP OF 2-3/8'LM/CMT --j •9455' ri "i 9455' 2.70'BKR DEPLOY SLV,D=2.25' w/WIPER PLUG BUSHING @ 9464',1D=1.78" oi,44.-. e r1, ►: ♦ 9466' —12-3/8'BTT PUP JOINT,D=1.995" (3-1/2'W-STOCK(09/14114)N 9504' 3-1/2"TBG,9.2#,L-80 TDS, —{ —9504 , .4. MLLOUT WINDOW(G-01B) @ 9504'-9513' .0087 bpf,D=2.992' ' 111—• 14:4"-• . N 2.NN i It. M 10283' —12-3/8"PUP w/RA PP TAG 11020' H2-3/8"PUP w/RA PP TAG _. ► ■ ■ 'II: 7"LNR,29#,13CR-80 NSCC, 10118' .0371 bpf,D=6.184" A It PERFORATION SUMMARY 4iNt41/4 REF LOG:BKR RPM ON 10/06/14 _ ANGLE AT TOP PERF: 90'0 10705' FBTD(TAGGED 10/07/14) H 11910' :` Note:Refer to Production DB historical pert data Vii. SIZE SPF MTTB21/AL OPN/SOZ SHOT SQZ 1.56" 6 10705-11155 0 10/07/14 2-38"LNR,4.7#,L-80 TH511, H 11945' 1.56" 6 11305-11740 0 10/07/14 .0039 bpf,D=1.995" 1.56" 6 11830-11909 0 10/07/14 DATE REV BY CONVENTS DOTE REV BY COMMENTS PRU DHOE BAY UNIT T 06/18/76 RIG 36 ORIGINAL COM PLETION 10/30/14 WI PJC FINAL ODE APPROVAL W8.L: G-01B 12/18/93 D-14 SIDETRACK COM PLETION 11/04/14 NS/JMD REMOVE FBTD(LANDING COLLAR) PERMT No:"2141030 10/08/14 NORDIC 1 CTD SIDETRACK AR No: 50-029-20214-02 10/14/14 PJC DREG HO CORRECTIONS SEC 12,T11N,R13E,2063'FNL&19745 FEL 10/15/14 MC/PJC GLV C/O&SET LIP(10/13/14) 10/20/14 MN PJC Rev ENV Corrections BP Exploration(Alaska) North America-ALASKA-BP Page 1 of 9 Operation Summary Report Common Well Name:G-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:9/19/2014 End Date:9/24/2014 X3-015LD-C:(2,049,340.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A©70.67usft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 9/19/2014 00:00 - 02:00 2.00 MOB P I PRE PREP RIG FOR MOVE,SECURE BOPE IN CELLAR,WARM DRIVE SYSTEM. DRILLER AND TOUR PUSHER PERFORM ROUTE INSPECTION. 02:00 - 08:30 6.50MOB P PRE HOLD PJSM WITH CREW AND MOVE RIG OFF 1 D-14B TO G-01 B. HAVE BEEN ATTEMPTING TO GET THE RIG ACROSS THE D-PAD ENTRANCE ROUTE SINCE 0230;THERE ISA SLIGHT INCLINE AND THE RIG IS STRUGGLING TO POWER OVER IT. WORKING ON JACKING THE BACK END UP,DECREASING THE MATT HEIGHT UP FRONT AND INCREASING THE RAMP LENGTH WITH EXTRA RIG MATTS TO REDUCE THE INCLINE. 08:30 - 12:00 3.50 MOB P PRE RIG UNDER WAY AGAIN 12:00 - 12:30 0.50 MOB P - PRE WHP'S-OA=OPSI IA=OPSI TREE=OPSI 12:30 - 13:15 0.75 MOB P PRE RIG ON G-PAD;SET T-MATS AND PLYWOOD FOR WALKING SURFACE 13:15 - 13:30 ; 0.25 MOB P PRE PJSM TO SPOT RIG OVER WELL 1 13:30 - 14:30 1.00 MOB P PRE• ALL WHP'S=OPSI,CLOSE IN ALL TREE VALVES 14:30 - 15:15 • 0.75 MOB P PRE RIG SPOTTED AND ACCEPTED I HOLD PJSM TO LTT THE TREE TO BREAK CONTAINMENT AND NU THE BOPE CALL PAD OP TO REMOVE LOTO ON WING VALVE 15:15 - 15:25 0.17 MOB P PRE LOTO REMOVED OPEN THE SSV LTT THE MASTER&SWAB VALVES TO ' 1 REMOVE THE TREE CAP AND NIPPLE UP AOGCC REP CHUCK SCHEVE HAS WAIVED WITNESSING OUR TEST 15:25 - 16:35 1.17 MOB P PRE GOOD LTT,REMOVE THE TREE CAP AND NIPPLE UP THE BOPE 16:35 - 17:00 0.42 MOB P PRE 'PERFORM RIG EVAC DRILL WITH DAY CREW -17:00 - 22:15 5.25 MOB P PRE SECURE STACK AND CHANGE LUBRICATOR. 22:15 - 22:45 0.50 1 MOB P PRE HOLD EVACUATION DRILLANDAAR WITH NIGHT CREW. 22:45 - 00:00 1.25 BOPSUR P PRE -PJSM,POST AND CHECK ALL BOPE DIAGRAMS AND MEASUREMENTS,AND FLUID PACK ALL LINES. -PRESSURE TEST BOPE PER BP,NORDIC I •AND AOGCC TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES. ****AOGCC WAIVED WITNESS OF TEST**** -TEST ALL AUDIBLEMSUALALARMS. -WSL SHUT-IN AND LOTO E-37A WELL WITH PAD OPERATOR AS PER WELL PLAN MITIGATIONS. Printed 10/20/2014 10:11:16AM North America-ALASKA-BP Page 2 of 9 Operation Summary Report Common Well Name:G-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/19/2014 End Date:9/24/2014 X3-015LD-C:(2,049,340.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:D0AM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A©70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 9/20/2014 00:00 - 04:00 4.00 BOPSUR P PRE -PRESSURE TEST BOPE PER BP,NORDIC AND AOGCC TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES. ""AOGCC WAIVED WITNESS OF TEST'••' -FUNCTION TEST BOPE COMPONENTS FROM CTS CONSOLE AND DRILLERS CONSOLE ON THE RIG FLOOR. 04:00 - 06:35 2.58 BOPSUR P PRE -HOLD PJSM,PULL COIL TO INJECTOR HEAD. • =COMPLETE FINAL BOPE TEST OF INNER `REEL VALVE TO PACK-OFF;RU TO PT MANUAL RAM LOCKS. 06:35 - 07:00 0.42 BOPSUR P PRE HOLD PJSM TO PULL COIL ACROSS AND STAB IN THE INJECTOR 07:00 - 07:45 0.75 BOPSUR P PRE PULL TEST GRAPPLE AS PER CTS PROCEDURE REMOVE SHIPPING BAR PULL COILACROSS TO INJECTOR 07:45 - 09:55 2.17 BOPSUR P PRE PIPE STABBED BUT THE WINCH CABLE GOT A COUPLE OF BROKEN STRANDS -CUT A MULE SHOE ON THE COIL TO PULL OUT OF THE PACKOFF THEN RESTAB AFTER THE BRASS HAS BEEN CHANGED SET THE INJECTOR ON THE WELL TO REMOVE THE PACK OFF TO CHANGE THE BRASS -RESTRINGING PULLOVER WINCH CABLE -CHANGE PACKOFFS 09:55 - 11:00 1.08 BOPSUR P PRE CUT OFF MULE SHOE TO MU THE CTC ALL PROCEDURES FOR THIS PROCESS HAVE BEEN REVIEWED AND PERMITS FILLED OUT. THE SWAB VALVE IS STILL SHUT IN AND THE NIGHT CAP IS IN PLACE AS PER THE CTS PROCDURE THAT IS APPROVED FOR HOT WORK WITHIN THE 35'RADIUS OF THE WELLHEAD 11:00 - 12:00 1.00 BOPSUR P PRE FILL COIL WITH KCL TO TEST THE REEL HARDLINE TEST REEL HARDLINE TO 250 LOW&4500 HIGH 12:00 - 12:30 0.50 BOPSUR P PRE GOOD TEST PT THE INNER REEL VALVE,PACKOFF AND BHI FLOATS 12:30 - 13:00 0.50 BOPSUR P PRE GOOD PT HOLD PJSM TO PERFORM THE RAM MANUAL •LOCK TESTS,BOTH 2"COMBI'S,2-3/8" COMBI'S AND BLINDS 13:00 - 15:15 2.25 BOPSUR P PRE TEST LOWEST SET OF 2"COMBI'S,GOOD 1TEST TEST UPPER SET OF 2"COMBI'S,GOOD TEST TEST 2-3/8"COMBI'S,GOOD TEST TEST THE BLIND SHEARS,GOOD TEST • • PREP TO OPEN UP TO THE WELLAND CHECK FOR PRESSURE Printed 10/20/2014 10:11:16AM North America-ALASKA-BP Page 3 of 9 Operation Summary Report Common Well Name:G-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/19/2014 End Date:9/24/2014 X3-015LD-C:(2,049,340.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A @70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:15 - 15:50 0.58 BOPSUR P PRE LINE UP TO TAKE RETURNS THROUGH THE CHOKE OUT TO THE TIGER TANK WITH THE INJECTOR ON THE WELLAND THE BLINDS CLOSED,OPEN THE WELL TO A CLOSED CHOKE WELL HAS 65 PSI ON IT,CRACK OPEN THE CHOKE AND CHECK FOR RETURNS WE HAVE RETURNS AT THE TIGER TANK, CONTINUE TO BLEED OFF WHP TO THE TT 15:30 RETURNS HAVE STOPPED,SHUT IN THE CHOKE TO SEE IF ANY PRESSURE BUILDS UP 15:35 NO PRESSURE INCREASE,OPEN THE CHOKE AND VERIFY NO RETURNS AT THE TT, NO RETURNS 15:40 LINE UP TO PUMP METH ACROSS THE TOP TO ENSURE THE HOLE IS FULL,HOLE IS FULL 15:45 SHUT DOWN THE PUMP,OPEN THE BLINDS AND CHECK THE WHITEY AT THE RIG FLOOR NO PRESSURE OR FLOW FROM WHITEY,ON LINE WITH THE PUMP AND GETTING FLUID AT THE WHITEY 15:50 - 16:00 0.17 BOPSUR P PRE HOLE IS FULL AND RETURN RATE AND DENSITY ARE CONSISTENT,SHUT DOW THE PUMP AND FLOW CHECK THE WELL 16:00 - 16:30 0.50 BOPSUR P PRE GOOD NO FLOW,PU THE INJECTOR AND INSPECT THE COMBI RAM MARKS ON THE PIPE.PIPE LOOKS GOOD,PREP TO HEAD UP 16:30 - 17:10 0.67 BOPSUR P PRE HEAD UP BHI UQC 17:10 - 17:20 0.17 BOPSUR P PRE PT THE CTC&UQC 17:20 - 17:30 0.17 BOPSUR P PRE GOOD PT,SET INJECTOR TO THE SIDE AND PUMP 1 CIRCULATION FORWARD WHILE HOLDING A PJSM TO MU THE BHA 17:30 - 17:45 0.25 STWHIP P WEXIT HOLD PJSM TO MU THE MILLING BHA 17:45 - 18:20 0.58 STWHIP P WEXIT MU THE MILLING BHA. 18:20 - 18:45 0.42 STWHIP P WEXIT PU INJECTOR,STAB ONTO THE BHA&TEST THE QTS. 18:45 - 19:15 0.50 STWHIP P WEXIT :PUMP SLACK FORWARD;60 BBLS KCLAT MAX RATE THROUGH EDC. 19:15 - 22:15 3.00 STWHIP P WEXIT -RIH TO 9347'AT 100 FPM,1.8 BPM IN/2.2 BPM OUT,WITH CLEAN KCL CIRCULATING THROUGH THE EDC,TAKING RETURNS TO TIGER TANK. -SWAP TO MILLING FLUID,CIRCULATING MINIMUM RATE,DISPLACING KCL TO FLOWBACK TANK. -PU AND LOG ATIE-IN PASS FROM 9300'TO 19470'WHILE DISPLACING KCL. 22:15 - 22:30 0.25 STWHIP P WEXIT STOP PER WELL SITE GEOLOGIST. 22:30 - 23:00 0.50 STWHIP P WEXIT -GOOD MUD TO SURFACE;SWAP RETURNS FROM FLOWBACK TANK TO MUD PITS. -PDC LOG CORRELATION(-8'CORRECTION). -PU,CLOSE EDC AND OBTAIN SPRS. -BLEED IA PRESSURE FROM 900 PSI TO 200 PSI. Printed 10/20/2014 10:11:16AM North America-ALASKA-BP Page 4 of 9 Operation Summary Report Common Well Name:G-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/19/2014 End Date:9/24/2014 X3-015LD-C:(2,049,340.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release: 10/8/2014 Rig Contractor:NORDIC CALISTA I UWI:500292021400 Active datum:RKB G-01A©70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 123:00 - 23:15 0.25 STWHIP P WEXIT -TAG PINCH POINT AT 9504'WITH PUMPS OFF. -PU,FREE SPIN 3530 PSI AT 1.6 BPM;PU WEIGHT:22K,SO WEIGHT:8.5K. 23:15 - 00:00 0.75 STWHIP P WEXIT -MILL WINDOW: SLACK OFF WITH PUMPS ON 1.6 BPM AND GET 100 PSI MOTOR WORK/ HOOKLOAD DECREASE 800 LBS AT 9503.2'. 9/21/2014 00:00 - 02:00 2.00 STWHIP P WEXIT MILL WINDOW FROM 9504'TO 9505.3'. RATE:1.6 BPM IN/OUT,MW:9.5 PPG IN/ OUT,PVT:291 BBLS CIRC PRESSURE:3655 PSI,FREE SPIN:3530 PSI,IA:645 PSI,OA:49 PSI WOB:2.3 K,CT WEIGHT:6.4 K 02:00 - 04:00 2.00 STWHIP P WEXIT MILL WINDOW FROM 9505.3'TO 9506.9'. RATE:1.6 BPM IN/OUT,MW:9.5 PPG IN/ OUT,PVT:291 BBLS CIRC PRESSURE:3620 PSI,FREE SPIN:3530 PSI,IA:754 PSI,OA:56 PSI WOB:3 K,CT WEIGHT:6.2 K 04:00 - 07:00 3.00 STWHIP P WEXIT MILL WINDOW FROM 9506.9'TO 9507.5'. RATE:1.6 BPM IN/OUT,MW:9.5 PPG IN/ OUT,PVT:291 BBLS CIRC PRESSURE:3550 PSI,FREE SPIN:3530 PSI,IA:797 PSI,OA:61 PSI WOB:2.9 K,CT WEIGHT:6.4 K 07:00 - 13:00 6.00 STWI4IP P WEXIT CONTINUE MILLING WINDOW FREE SPIN=3500 PSI AT 1.60 BPM RATE IN=1.56 BPM RATE OUT=1.56 BPM ROP=0.5 FPH WOB=3.42 K CIRC PSI= 3486 PSI MW IN=9.49 PPG MW OUT=9.45 PPG ECD =10.99 PPG IAP=841 PSI OAP=68 PSI PVT=292 BBLS IAP=875 PSI BLEED DOWN TO 400 PSI SLOW ROP MILLING-EACH 0.1'WE GET ADDS-0.6-0.8K WOB,WE ARE OPERATING BETWEEN 3.2-3.7K WOB,MAX=3.8K MILL IS WORKING ON 3-1/2 AND STARTING ON THE 7" 13:00 - 14:10 1.17 STWHIP P WEXIT CONTINUE MILLING WINDOW FREE SPIN=3500 PSI AT 1.60 BPM RATE IN=1.56 BPM RATE OUT=1.56 BPM ROP=0.5 FPH WOB=3.42 K CIRC PSI= 3486 PSI MW IN=9.48 PPG MW OUT=9.43 PPG ECD =10.99 PPG IAP=598 PSI OAP=94 PSI PVT=291 BBLS TIME BETWEEN TENTHS IS GETTING FASTER 14:10 - 15:50 1.67 STWHIP P WEXIT CONTINUE MILLING WINDOW FREE SPIN=3500 PSI AT 1.60 BPM RATE IN=1.56 BPM RATE OUT=1.56 BPM ROP=1.0 FPH WOB=2.78 K CIRC PSI= 3479 PSI MW IN=9.48 PPG MW OUT=9.43 PPG ECD =10.99 PPG IAP=620 PSI OAP=99 PSI PVT=292 BBLS Printed 10/20/2014 10:11:16AM North America-ALASKA-BP Page 5 of Operation Summary Report Common Well Name:G-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/19/2014 End Date:9/24/2014 X3-015LD-C:(2,049,340.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A©70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:50 - 16:20 0.50 STWHIP P WEXIT CONTINUE MILLING WINDOW FOR 0.5'THAT WILL PUT THE STRING MILL PAST THE BOTTOM OF THE WINDOW FREE SPIN=3500 PSI AT 1.60 BPM RATE IN=1.56 BPM RATE OUT=1.56 BPM ROP=0.5 FPH WOB=3.42 K CIRC PSI= 3486 PSI MW IN=9.48 PPG MW OUT=9.43 PPG ECD =10.99 PPG IAP=649 PSI OAP=106 PSI PVT=291 BBLS FLAG 2 SAMPLES TO LOOK FOR FORMATION FIRST SAMPLE HAD 15%FORMATION WITH I METAL&CMT SECOND HAD 10%FORMATION WITH METAL &CMT AS WELL 16:20 - 16:30 0.17 STWHIP P WEXIT LOOKS LIKE WE HAVE A FULL 9'WINDOW. THE STRING REAMER IS AT THE BOTTOM OF THE WINDOWAND THE WOB DROPPED OFF FROM 2.4K DOWN TO 0.8K-100 PSI LESS ON CIRC PRESSURE.WAIT FOR THE LAST 0.1'TO DRILL OFF THEN START ON RAT HOLE 16:30 - 20:00 3.50 STWHIP P WEXIT START MILLING 10'OF RAT HOLE;SLOW MILLING IN ZONE 4 RATE IN=1.7 BPM RATE OUT=1.7 BPM ROP=1.0 FPH WOB=2.98 K CIRC PSI= 3840 PSI MW IN=9.48 PPG MW OUT=9.44 PPG ECD =11.06 PPG IAP=762 PSI OAP=143 PSI PVT=295 BBLS 20:00 - 22:00 2.00 STWHIP P WEXIT CONTINUE MILLING RAT HOLE;ALLOW WEIGHT TO DRILL OFF AT 10'THROUGH BOTTOM OF WINDOW. FREE SPIN=3550 PSI AT 1.6 BPM RATE IN=1.6 BPM RATE OUT=1.6 BPM ROP=1.0 FPH WOB=2.69 K CIRC PSI= 3625 PSI MW IN=9.48 PPG MW OUT=9.44 PPG ECD =11.03 PPG IAP=776 PSI OAP=155 PSI PVT=295 BBLS 22:00 - 23:55 1.92 STWHIP P WEXIT BACKREAM PASS WINDOW W/15°RIGHT OF LOW SIDE TF I REAM DOWN WINDOW WITH AS DRILLED TF BACKREAM PASS WINDOW W/15°LEFT OF LOW SIDE TF PU 10'ABOVE TOP OF WINDOW,SHUT DOWN PUMPS AND DRIFT THROUGH WINDOW TO 9522'AT 5 FPM 23:55 - 00:00 0.08 STWHIP P WEXIT FLOW CHECK;STATIC. 9/22/2014 00:00 - 02:00 2.00 STWHIP P WEXIT PUMP 25 BBLS HIGH-VIS SWEEP ON BOTTOM;OPEN EDC ABOVE WINDOWAND CIRCULATE OUT AT MAX RATE;DUMP SWEEP. PU ABOVE WINDOW AND OPEN EDC. POH AT 100 FPM,CIRCULATING MAX RATE OF 2.1 BPM IN/1.8 BPM OUT. 02:00 - 02:05 0.08 STWHIP P WEXIT FLOW CHECK AT SURFACE;STATIC. Printed 10/20/2014 10:11:16AM North America-ALASKA-BP Page 6 of 9 Operation Summary Report Common Well Name:G-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/19/2014 End Date:9/24/2014 X3-015LD-C:(2,049,340.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor NORDIC CALISTA UW:500292021400 Active datum:RKB G-01A©70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:05 - 02:30 0.42 STWHIP P WEXIT PJSM FOR HANDLING BHA. 02:30 - 03:15 0.75 STWHIP P WEXIT POP OFF AND STAND BACK INJECTOR. LD MILL BHA#1;MILL=2.73 GO;REAMER= 2.73 NO-GO(GAUGE WINDOW). 03:15 - 04:15 1.00 DRILL P PROD1 MU DRILLING BHA#2. STAB ON INJECTOR,TEST QTS 250 PSI LOW/ 3500 PSI HIGH FOR 5 MINUTES. 04:15 - 06:15 2.00 DRILL P PROD1 OPEN EDC AND RIH AT 90 FPM,CIRCULATING 2.2 BPM IN/2.5 BPM OUT. 06:15 - 06:30 0.25 DRILL P PROD1 LOG TIE IN 06:30 - 07:10 0.67 DRILL P PROD1 CORRECT DEPTH-10' RIH AND LOG WHERE THE 2 JTS OF CSH WERE IN THE BHA CORRECT DEPTH+2' • 07:10 - 07:30 0.33 DRILL P PROD1 TAG TD AT 9521',PU TO UP WT THEN OBTAIN SPR'S 07:30 - 11:00 3.50 DRILL P PROD1 DRILL PILOT HOLE FREE SPIN=3658 PSI AT 1.70 BPM RATE IN=1.70 BPM RATE OUT=1.70 BPM ROP=22 FPH WOB=1.49 K CIRC PSI= 3882 PSI MW IN=9.48 PPG MW OUT=9.44 PPG ECD •=11.04 PPG IAP=486 PSI OAP=122 PSI PVT=263 BBLS 11:00 - 11:35 0.58 DRILL P PROD1 STARTING TO LOOSE A LITTLE FLUID,0.2 BPM THEN INCREASED TO 0.6 BPM AND WITHIN 1'STARTED COMING BACK • MI IS MIXING 290 BBLS OF MUD FOR US 9547.5'RETURNS ARE 1:1 9548.5'LOOSING-0.1 TO 0.2 BPM LOSSES TO 9548.5'=5 BBLS 11:35 - 14:00 2.42 DRILL P PROD1 CONTINUE SLOW ROP DRILLING IN Z3,STILL GETTING STALLS SO THE BIT STILL HAS CUTTERS PVT=254 BBLS LOSSES TO 9550.0'=9 BBLS, 9550 SAMPLE IS 25%CHERT WITH SIDERITE, PYRITE VERY TIGHTLY CEMENTED SILICA SAND • 14:00 - 16:25 2.42 DRILL P PROD1 CONTINUE SLOW ROP DRILLING IN Z3,STILL GETTING STALLS LOSSES TO 9560=15 BBLS PVT=244 BBLS DLR=4 BPH(SINCE 11:35) 16:25 - 21:00 4.58 DRILL P PROD1 CONTINUE SLOW ROP DRILLING IN Z3,STILL GETTING STALLS PVT DOWN TO 237 BBLS ADD MUD TO PITS DRILL PILOT HOLE FREE SPIN=3650 PSI AT 1.70 BPM RATE IN=1.67 BPM RATE OUT=1.65 BPM ROP=5 FPH WOB=3.0 K CIRC PSI=4094 PSI MW IN=9.47 PPG MW OUT=9.42 PPG ECD =11.12 PPG IAP=481 PSI OAP=186 PSI PVT=304 BBLS • Printed 10/20/2014 10:11:16AM North America-ALASKA-BP Page 7 of 9 Operation Summary Report Common Well Name:G-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/19/2014 End Date:9/24/2014 X3-015LD-C:(2,049,340.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A(dp0.67usft(above Mean Sea Level) Date From-To Hrs Task I Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:00 - 00:00 3.00 DRILL P PROD1 CONTINUE SLOW ROP DRILLING IN Z3,STILL GETTING STALLS.ROP HAS INCREASED A LITTLE. DRILL PILOT HOLE FREE SPIN=3650 PSI AT 1.69 BPM RATE IN=1.69 BPM RATE OUT=1.65 BPM ROP=7 FPH WOB=3.9 K CIRC PSI=4094 PSI MW IN=9.47 PPG MW OUT=9.42 PPG ECD 11.12 PPG IAP=481 PSI OAP=186 PSI PVT=304 BBLS 9/23/2014 00:00 - 03:00 3.00 DRILL P PROD1 CONTINUE SLOW ROP DRILLING IN Z3,STILL GETTING STALLS.ROP HAS NOT CHANGED. HOLDING 3-5 FPH. DRILL PILOT HOLE FREE SPIN=3650 PSI AT 1.69 BPM RATE IN=1.69 BPM RATE OUT=1.65 BPM ROP=5 FPH WOB=3.9 K CIRC PSI=3860 PSI MW IN=9.47 PPG MW OUT=9.42 PPG ECD =11.12 PPG IAP=549 PSI OAP=339 PSI PVT=302 BBLS 03:00 - 06:20 3.33 DRILL P PROD1 CONTINUE SLOW ROP DRILLING IN Z3,STILL GETTING STALLS.ROP HAS NOT CHANGED. HOLDING 3-5 FPH. DRILL PILOT HOLE FREE SPIN=3658 PSI AT 1.69 BPM RATE IN=1.66 BPM RATE OUT=1.67 BPM ROP=3-5 FPH WOB=3.0 K CIRC PSI= 3860 PSI MW IN=9.47 PPG MW OUT=9.42 PPG ECD 11.12 PPG IAP=564 PSI OAP=359 PSI PVT=302 BBLS 06:20 - 07:30 1.17 DRILL P PROD1 OBTAIN SPR'S THEN CONTINUE DRILLING PILOT HOLE TALKED TO THE GEO AND WE ARE STILL IN CHERT AND VERY TIGHTLY CEMENTED FORMATION 07:30 - 07:40 0.17 DRILL P PROD1 PU OFF BOTTOM,NOT MAKING ANY PROGRESS IN THE LAST COUPLE OF HOURS, WE CAN STILL STALL THE BIT BUT THE ROP HAS DROPPED OFF SIGNIFICANTLY.PU TO THE WINDOWAND CALL THE DRLG SUPT& ODE. POOH AND CHECK THE BIT. 07:40 - 07:45 0.08 DRILL P PROD1 FLOW CHECK WELL 07:45 - 09:20 1.58 DRILL P PROD1 GOOD NO FLOW,POOH TO CHECK THE BIT 09:20 - 09:35 0.25 DRILL P PROD1 FLOW CHECK AT SURFACE 09:35 - 10:00 0.42 DRILL P PROD1 GOOD NO FLOW,TAG UP AND LD THE BHA 10:00 - 10:35 0.58 DRILL P PROD1 BHA OOH BIT GRADE=7-7-RO-A-X-I-BT-PR MU ANOTHER NEW HYCALOG DURAFORCE XD CUTTER BIT AND RIH 10:35 - 13:30 2.92 DRILL P PROD1 GOOD PT ON THE QTS,RIH. LOG TIE-IN WITH -10'CORRECTION. RUN TO CURRENT TD. Printed 10/20/2014 10:11:16AM North America-ALASKA-BP Page 8 of 9 Operation Summary Report Common Well Name:G-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/19/2014 End Date 9/24/2014 X3-015LD-C:(2,049,340.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A©70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:30 - 21:00 7.50 DRILL P PROD1 DRILL AHEAD FROM 9595'. FREE SPIN OF 3415 PSI AT 1.65 BPM. -INITIALLY SLOW ROP,AVERAGING 10 FPH. ROP PICKED UP TO AVERAGE OF 25 FPH AT 9600'. DRILL 3"PILOT HOLE FREE SPIN=3550 PSI AT 1.65 BPM RATE IN=1.65 BPM RATE OUT=1.63 BPM ROP=33 FPH WOB=.85 K CIRC PSI= 3779 PSI MW IN=9.49 PPG MW OUT=9.44 PPG ECD =11.11 PPG IAP=524 PSI OAP=320 PSI PVT=292 BBLS SHORT WIPER TRIPS AS NECESSARY CATCHING SAMPLES FOR GEO EVERY 50' 21:00 - 00:00 3.00 DRILL P PROD1 DRILL AHEAD FROM 9755'. FREE SPIN OF 3550 PSI AT 1.64 BPM. DRILL 3"PILOT HOLE FREE SPIN=3560 PSI AT 1.65 BPM RATE IN=1.65 BPM RATE OUT=1.63 BPM ROP=37 FPH WOB=.47 K CIRC PSI= 3757 PSI MW IN=9.49 PPG MW OUT=9.44 PPG ECD =11.11 PPG IAP=573 PSI OAP=365 PSI PVT=290 BBLS SHORT WIPER TRIPS AS NECESSARY CATCHING SAMPLES FOR GEO EVERY 25' 9/24/2014 00:00 - 03:00 3.00 DRILL P PROD1 DRILL AHEAD FROM 9841'. FREE SPIN OF 3550 PSI AT 1.64 BPM. DRILL 3"PILOT HOLE FREE SPIN=3560 PSI AT 1.65 BPM RATE IN=1.65 BPM RATE OUT=1.63 BPM ROP=37FPH WOB=.47K CIRC PSI= 3757 PSI MW IN=9.49 PPG MW OUT=9.44 PPG ECD =11.11 PPG IAP=573 PSI OAP=365 PSI PVT=290 BBLS SHORT WIPER TRIPS PRIOR TO DRILLING AHEAD FROM 9900' CATCHING SAMPLES FOR GEO EVERY 5' FROM 9900' 03:00 - 09:30 6.50 DRILL P PROD1 DRILL AHEAD FROM 9915'. DRILL 3"PILOT HOLE FREE SPIN=3600 PSI AT 1.67 BPM RATE IN=1.67 BPM RATE OUT=1.63 BPM ROP=26 FPH WOB=1.2 K CIRC PSI= 3853 PSI MW IN=9.49 PPG MW OUT=9.44 PPG ECD =11.10 PPG IAP=620 PSI OAP=400 PSI PVT=288 BBLS CATCHING SAMPLES FOR GEO EVERY 5' FROM 9900' Printed 10/20/2014 10:11:16AM North America-ALASKA-BP Page 9 of 9 Operation Summary Report Common Well Name:G-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/19/2014 End Date:9/24/2014 X3-015LD-C:(2,049,340.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UW:500292021400 Active datum:RKB G-01A @70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:30 - 11:15 1.75 DRILL P PROD1 DRILL AHEAD FROM 10025'. FREE SPIN 3600 PSI AT 1.70 BPM. GATHERING SAMPLES EVERY 5'UP TO 10,000'. -1.70-1.73 BPM,3830-3915 PSI,WOB.9-1.6K, ROP FAIRLY CONSISTENT BETWEEN 12-15 FPH,ECD 11.1 PPG MW IN AND OUT 9.5 PPG,NO LOSSES TO j FORMATION -SAMPLES ARE CONSISTENT,KAVIK FORMATION EVIDENT. GEOLOGISTS AGREE TO CALL TD FOR PLUBACKAT 10,025'. FLOW CHECK OFF BOTTOM. ALL GOOD. PICK UP FAIRLY CLEAN WITH-5K OVERPULL. 11:15 - 12:00 0.75 DRILL P PROD1 POH TO WINDOW WITH NO ISSUES TO WINDOW. PULL INTO WINDOW,FLOW CHECK. ALL GOOD,OPEN EDC. RUN DOWN AND JET ACROSS WHIPSTOCKTRAY. POH TO SURFACE. 12:00 - 12:30 0.50 DRILL P PROD1 FLOW CHECK AT SURFACE,ALL GOOD. PJSM ON LAYING DOWN BHA. TAG UP AT SURFACE,POP OFF. LAY DOWN BHA. BIT GRADE 3-2-BT-A-X-I-BT-BHA. 12:30 - 15:30 3.00 DRILL N SFAL PROD1 TROUBLESHOOT ISSUES WITH INECTOR WEIGHT INDICATOR. CTS EQUIPMENT TECHS ON SITE,CONDUCT ANALYSIS ON WEIGHT DIFFERENCES IN ELECTRONIC WEIGHT INDICATOR AND COILCAT WEIGHT READING. FAULTY WEIGHT INDICATOR. CHANGE OUT,RE-TEST,ALL GOOD. PRESSURE TEST LOWER LUBRICATOR EXTENSION BREAKS. Printed 10/20/2014 10:11:16AM North America-ALASKA-BP Page 1 of 15 Operation Summary Report Common Well Name:G-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/24/2014 End Date:10/3/2014 X3-015LD-C:(1,640,247.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A @70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 9/24/2014 15:30 - 16:30 1.00 DRILL P PROD1 PJSM FOR MAKING UP BILLET ONTO RUNNING ASSEMBLY AND BHI SMART TOOLS. MU BILLET ASSEMBLY PER BAKER REP. STAB ON TO INJECTOR,PRESSURE TEST QUICK TEST SUB. 16:30 - 19:30 3.00 DRILL P PROD1 RIH WITH BILLET ASSEMBLY. LOG TIE-IN WITH(-11.5'CORRECTION). RIH TO 9594'AND SET DOWN 4K;PU AND SEE 7K OVERPULL. SLACK OFF AGAIN,SET DOWN 5K;PU AND SEE 7-8K OVERPULL. PU TO 9560'(ABOVE TIGHT SPOT/BELOW WINDOW);CIRCULATE AT MIN RATE. DISCUSS PLAN FORWARD WITH ODE AND GEOLOGY;DECIDE TO POH FOR CLEANOUT TRIP. 19:30 - 19:45 0.25 DRILL N DPRB 9,594.00 PROD1 ESTABLISH PU WEIGHT OF 34K. POH WITH BILLET ASSEMBLY AT 10 FPM FROM 9560'THROUGH WINDOW TO 9500';NO VISIBLE OVERPULL. 19:45 - 20:00 0.25 DRILL N DPRB 9,594.00 PROD1 FLOW CHECK;STATIC. 20:00 - 22:00 2.00 DRILL N DPRB 9,594.00 PROD1 POH WITH BILLET ASSEMBLY FROM 9500', CIRCULATING THROUGH THE EDC AT 0.7 BPM AND 80 FPM. 22:00 - 22:30 0.50 DRILL N DPRB 9,594.00 PROD1 PJSM FOR LD BILLET ASSEMBLY AND MU CLEANOUT BHA. FLOW CHECK AT SURFACE; STATIC. 22:30 23.30 1.00 DRILL N DPRB 9,594.00 PROD1 POP OFF INJECTOR,STAND BACK BHA#4 TO FVS; LD XO,SETTING TOOL,SETTING SLEEVE AND BILLET. MU BHA#5(CLEANOUT BHA)WITH 2 3/8" EXTREME MOTOR WITH 1°BENT HOUSING AND 3"BI-CENTER BIT. STAB ON INJECTOR;TEST QTS TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES. 23:30 - 00:00 0.50 DRILL N DPRB 9,594.00 PROD1 RIH WITH CLEANOUT BHA AT 90 FPM. CIRCULATING PRESSURE:3900 PSI,2.3 BPM IN/2.65 BPM OUT. 9/25/2014 00:00 - 01:45 1.75 DRILL N DPRB 9,594.00 PROD1 RIH WITH CLEANOUT BHA AT 90 FPM. CIRCULATING PRESSURE:3900 PSI,2.3 BPM IN/2.65 BPM OUT. LOG TIE-IN(-13'CORRECTION). ORIENT TO AS DRILLED TF AND DRIFT WINDOW. 01:45 - 04:15 2.50 DRILL N DPRB 9,594.00 PROD1 CLOSE EDC,OBTAIN SPR'S,CIRCULATE WITH AS DRILLED RATE AND CLEANOUT FROM 9515'TO 9875'. RIH AT 10 FPM AND 18-19K SLACK OFF WEIGHT. NO NOTICEABLE SETDOWNS OR OVERPULLS. PULL UP TO WINDOW WITH OFFSET TF,RIH TO 9875',PUMP 20 BBLS HIGH-VIS SWEEP FLOW CHECK ON BOTTOM(STATIC)AND PULL TO 9550'. DRY-DRIFT 9575'-9625'WITH AS-DRILLED TF AND 18K SO;NO NOTICEABLE SET-DOWN. Printed 10/20/2014 10:11:59AM North America-ALASKA-BP Page 2 of 15 Operation Summary Report Common Well Name G-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/24/2014 End Date: 10/3/2014 X3-015LD-C:(1,640,247.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor.NORDIC CALISTA UVN:500292021400 Active datum:RKB G-01A©70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT r NPT Depth Phase Description of Operations (hr) (usft) 04:15 - 06:30 2.25 DRILL N DPRB 9,594.00 PROD1 PULL TO WINDOW,FLOW CHECK;(STATIC). OPEN EDC,CIRCULATE MAX RATE AND POH AT 100 FPM. PULL TO SURFACE,FLOW CHECK. ALL GOOD. PJSM ON LAYING DOWN BHA. 06:30 - 08:00 1.50 DRILL N DPRB 9,594.00 PROD1 POP OFF,LAY DOWN BHA. -CONCURRENT OPS:RE-INSPECT SHEAR SCREWS AND ANCHORS ON BILLET. EVERYTHING GOOD. -PJSM ON PICKING UP BILLET BHA. MU BHA 'PER BOT REP AND BHI. STAB ON,PRESSURE TEST QUICK TEST SUB. 08:00 - 12:00 4.00 DRILL N DPRB 9,584.00 PROD1 RIH WITH BILLET ASSEMBLY. TIE IN AT 9350' WITH-13.5'CORRECTION. CONTINUE TO RIH. -SOW ABOVE WINDOW 18-19K WHILE RIH. PU W AT WINDOW 32K. CLOSE EDC AT WINDOW. SLOWLY MOVE DOWN HOLE WITH BILLET ASSEMBLY WITH SOW 19K. MOVE PAST 9594'WITH BULLNOSE GUIDE SHOE AND TWO JOINTS OF 2-3/8"TUBING WITH NO ISSUES BUT SLIGHT TAG OF 1.5K AT 9664', [SET DOWN TO 3.4K. •-PICK UP CLEAN,MOVE BACK DOWN AND AGAIN TAG AT BULLNOSE DEPTH OF 9663' AND EVENTUALLY SET DOWN WITH 4.4K. ATTEMPT TO MOVE ORIENTER BUT DOESN'T HELP. PICK UP TO RELEASE WITH 5K OVERPULL. PICK UP TO ABOVE STICKING POINT. -DEDUCT OUT LOWER PORTION OF BHA AND IT PLACES STICKING POINT BETWEEN 9583' AND 9594'. •-DISCUSS ISSUE WITH ODE,WAIT FOR TEAM TO GET BACK WITH RIG 12:00 - 12:15 0.25 DRILL N DPRB 9,594.00 PROD1 PULL INTO WINDOW WITH EDC AND OPEN. BREAK CIRCULATION AND CIRCULATE WHILE WAITING. 12:15 - 14:45 2.50 DRILL N DPRB 9,594.00 PROD1 FLOW CHECK AT WINDOW. ALL GOOD. POH CIRCULATING AT.75 BPM,1135 PSI. NO ISSUES POH. FLOW CHECK AT SURFACE, ALL GOOD. PJSM FOR LAYING DOWN BHA. 14:45 - 16:30 1.75 DRILL N DPRB 9,594.00 PROD1 LD BHA. NO DAMAGE OR REMARKABLE !CHARACTERISTICS ON BULLNOSE,ON 'BILLET,OR ON RUNNING TOOLS. MU OPEN HOLE WHIPSTOCK ASSEMBLY WITH ANCHOR ASSEMBLY. STAB ON,PRESSURE TEST QUICK TEST SUB. 16:30 - 19:15 2.75 DRILL N DPRB 9,594.00 PROD1 RIH WITH OH WHIPSTOCK ASSEMBLY TO 9308'. STOP PUMP.CLOSR EDC. LOG TIE-IN WITH-14'CORRECTION. ORIENT WHIPSTOCK TOOL FACE TO HIGH SIDE AT 0" 19:15 - 19:30 0.25 DRILL N DPRB 9,594.00 PROD1 RIH WITH WHIPSTOCK BHA.PASS THROUGH TROUBLE SPOT AT 9594'WITH NO PROBLEMS. RIH TO 9785'WITH NO PROBLEM. CONFIRM ORIENTAION Printed 10/20/2014 10:11:59AM North America-ALASKA-BP Page 3 of 15 Operation Summary Report Common Well Name:G-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/24/2014 End Date:10/3/2014 X3-015LD-C:(1,640,247.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A @70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:30 - 19:45 0.25 STWHIP P PROD1 POSITION TOP OF WHIPSTOCK AT 9775' INCREASE CIRCULATION PRESSURE TO 3500 PSI,NOTE DROP OFF ABRUPTLY INDICATING THE WHIPSTOCK ANCHOR SET. SET DOWN 5000 LBS TO CONFIRM ANCHOR IS SET. 19:45 - 21:30 1.75 STWHIP P PROD1 PICK UP ABOVE WHIPSTOCK.FLOW CHECK. OK. POH WITH WHIPSTOCK RUNNING TOOLS. HOLD PJSM FOR HANDLING BHA. 21:30 - 21:35 0.08 STWHIP P PROD1 FLOW CHECK;STATIC. 21:35 - 22:45 1.17 STWHIP P PROD1 POP OFF AND SET BACK INJECTOR. STAND BACK BHA TO FLOAT SUB AND LD SETTING TOOL AND SETTING SLEEVE. MU 2-3/8"EXTREME MOTOR WITH 0.6°BENT HOUSING,STRING MILL AND 2.74"DIAMOND MILL. STAB ON INJECTOR AND TEST QTS TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES. 22:45 - 00:00 1.25 STWHIP P PROD1 RIH WITH MILLING SIDE TRACK BHAAT 100 FPM.CIRCULATE AT 1 BPM WITH 1482 PSI 9/26/2014 00:00 - 01:00 1.00 STWHIP P PROD1 RIH WITH MILLING SIDE TRACK BHA AT 100 •FPM.CIRCULATE AT 1 BPM WITH 1482 PSI STOP AT WINDOW. CLOSE EDC.TIE IN WITH RA MARKER.CORRECTION-12' RIH. TAG AT 9573' 01:00 - 02:00 1.00 STWHIP P PROD1 WASH AND REAM FROM 9583'. PUMP AT 1.56 BPM WITH 3307 PSI. 1.85 WOB WORK PIPE THROUGH TIGHT SPOT FROM 9573'TO 9597' MOTOR WORK AND STALLS WHILE REAMING THROUGH TIGHT SPOT. POH ABOVE TIGHT SPOT AND RIH.PASS THROUGH TO 9597'WITH NO RESISTANCE. 02:00 - 03:00 1.00 STWHIP P PROD1 IIRIH TO TOP OF WHIPSTOCK AT 9774' POH SLOWLY.RECORD SPR ON BOTH PUMPS RIH TO TOP OF WHIPSTOCK AND DRY TAG AT 9774' 03:00 - 06:00 3.00 STWHIP P PROD1 SIDE TRACK WELL WITH MILL FROM 9774'. CIRCULATE AT 1.65 BPM WITH 3538 PSI WOB.13 TO.6 FREE SPIN 3435 PSI. TIME DRILL FIRST 3' 06:00 - 11:15 5.25 STWHIP P PROD1 CONTINUE WITH MILLING OPERATIONS OFF OF WHIPSTOCK. -MILL AT 1.65-1.70 BPM,3780-3910 PSI,WOB 2.1-3.4K,CONSISTENT ROP OF 3 FPH,ECD 11.1 PPG -MW IN 9.50 PPG,MW OUT 9.45 PPG,NO LOSSES TO FORMATION -MILL TO 9790'. MAKE SLOW BACKREAM PASS AND DRY PASS,ALL LOOKS GOOD. -FLOW CHECK,ALL GOOD Printed 10/20/2014 10:11:59AM North America-ALASKA-BP Page 4 of 15 Operation Summary Report Common Well Name.G-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/24/2014 End Date:10/3/2014 X3-015LD-C:(1,640,247.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A©70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:15 - 16:30 5.25 STWHIP P PROD1 PICK UP TO 9620'AND BEGIN REAMING OPERATIONS IN VARYING ORIENTATIONS TO CLEAN UP HOLE SECTION FROM 9570'TO 9620'. -CONDUCT KICK WHILE DRILLING DRILL WITH NEW CTS OPERATOR IN CHAIR. SHUT DOWN FOR FLOW CHECK,SIMULATE FLOW AT SHAKER,FOLLOW STANDING ORDERS. GOOD CREW RESPONSE. CTS DRILLER CLOSED IN HCR. SIMULATED HCR FAILURE. NORDIC DRILLER HAD TO THEN LINE UP CHOKE MANIFOLD TO A CLOSED SUPERCHOKE. GIVES CREW THE ABILITY TO CONTINUE MONITORING WELL PRESSURE. GIVE ALL CLEAR. POH TO WINDOW,FLOW CHECK. ALL GOOD,OPEN EDC,JET ACROSS WHIPSTOCK i IN WINDOW. 16:30 - 18:45 2.25 STWHIP P PROD1 POH WITH MILLING BHA. FLOW CHECK AT BHA BEFORE COMING TO SURFACE. POH AND TAG UP ON INJECTOR. POP INJECTOR OFF THE WELLAND HANG OVER THE CIRCULATING HOLE. 18:45 - 19:30 0.75 STWHIP P PROD1 POH LAY DOWN MILLING BHA. GAUGE MILL,2.73"GO 2.72"NO GO. INSTALL NON SKID FLOOR MATS AROUND TABLE. 19:30 - 20:00 0.50 BOPSUR P PROD1 FUNCTION TEST BOP.OPERATE FROM DRILLER'S PANEL ON RIG FLOOR. USED 2"AND 2-3/8"TEST JOINTS. 20:00 - 20:45 0.75 DRILL P PROD1 PICK UP BUILD DRILLING BHA WITH RR 2.7"X 3"BIT AND 1.5°BENT MOTOR. 20:45 - 23:30 2.75 DRILL P PROD1 RIH WITH BUILD BHA TO 9467' STOP PUMP.CLOSE EDC LOG TIE IN AT RA MARKER.CORRECTION-12' 9737'RECORD SPR ON BOTH PUMPS RIH TO 9756'STOP PUMP.DRY DRIFT ACROSS THE WHIPSTOCK PUMP ON AT 9785. TAG BOTTOM AT 9790' 23'30 - 00'00 0.50 DRILL P PROD1 DRILL AHEAD FROM 9790'. DRILL 3"BUILD SECTION FREE SPIN=3534 PSI AT 1.65 BPM RATE IN=1.65 BPM RATE OUT=1.65 BPM ROP=29 FPH WOB=1.39 K CIRC PSI= 3779 PSI MW IN=9.49 PPG MW OUT=9.44 PPG ECD =11.01 PPG IAP=190 PSI OAP=172 PSI PVT=290 BBLS 9/27/2014 00:00 - 03:00 3.00 DRILL P PROD1 DRILL AHEAD FROM 9810'. DRILL 3"BUILD SECTION FREE SPIN=3580 PSI AT 1.66 BPM RATE IN=1.67 BPM RATE OUT=1.67 BPM ROP=54 FPH WOB=1.47 K CIRC PSI= 3870 PSI MW IN=9.50 PPG MW OUT=9.46 PPG ECD =11.08 PPG IAP=427 PSI OAP=269 PSI PVT=289 BBLS Printed 10/20/2014 10:11:59AM North America-ALASKA-BP Page 5 of 15 Operation Summary Report Common Well Name:G-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/24/2014 End Date:10/3/2014 X3-015LD-C:(1,640,247.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A @70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03.00 - 06:00 3.00 DRILL P PROD1 DRILL AHEAD FROM 9926'. PERIODIC SHORT WIPER TRIPS. DRILL 3"BUILD SECTION FREE SPIN=3580 PSI AT 1.64 BPM RATE IN=1.65 BPM RATE OUT=1.64 BPM ROP=60 FPH WOB=1.05 K CIRC PSI= 3801 PSI MW IN=9.50 PPG MW OUT=9.46 PPG ECD =11.08 PPG IAP=454 PSI OAP=287 PSI PVT=287 BBLS 06:00 - 09:15 3.25 DRILL P PROD1 RECORD SLOW PUMP RATES. CONTINUE TO DRILL AHEAD IN BUILD SECTION. FREE SPIN OF 3600 PSI AT 1.65 BPM. -1.62-1.65 BPM,3765-3930 PSI,WOB 1.9-2.9K, ECD 11.1 PPG,ROP CONSISTENT AT 40-45 FPH -MW IN AND OUT 9.5 PPG,NO LOSSES DURING DRILLING -LANDING OF BUILD AT 10,160'. CONDUCT SHORT WIPER TRIP,FLOW CHECK OFF BOTTOM,ALL GOOD. 09 15 - 1100 2.75 DRILL P PROD1 POH TO WINDOW WITH NO ISSUES,PASS BY OPEN HOLE WHIPSTOCK AT MINIMAL FLOW RATE. PUWTHROUGH SECTION 31K. PULL INTO WINDOW,FLOW CHECK,ALL GOOD. OPEN EDC,JET ACROSS WINDOW,PULL OUT OF HOLE AT MAX RATE. FLOW CHECK AT SURFACE,ALL GOOD. PJSM ON LAYING DOWN BHA. 12:00 - 12:45 0.75 DRILL P PROD1 POP OFF,ROUTINE INSPECTION OF COIL REVEALS 2 GOUGES 3"LONG AND 1/8"DEEP APPROXIMATELY 7 ABOVE CONNECTOR. CALL CTS TECHNICAL ADVISOR,SEND PICTURES IN. RECOMMENDATION IS TO CUT OUT SPOT. 12:45 - 13:00 0.25 DRILL P PROD1 LAY DOWN BHA. BIT GRADE 1-2-CT-S-X-I-B U-BHA. 13:00 - 14:00 1.00 DRILL N WAIT 10,160.00 PROD1 CTS REPRESENTATIVE CONDUCTING SEMI-ANNUAL INSPECTION ON INJECTOR COMPONENTS,SLING,SHACKLE. 14:00 - 18:00 4.00 DRILL P PROD1 PJSM ON COIL OPERATIONS. DISCUSS STEPS TO BE TAKEN TO CUT COIL AND RE-HEAD,PRESSURES AND BARRIERS. CUT COIL CONNECTOR OFF,PUMP SLACK BACK, CUT 61'OF COIL OFF(CUT 1-1/2'SECTION WHERE GOUGES ARE TO BE SENT TO CTS LAB)AND UNTIL CREW DOESN'T FIND ANY OTHER SCARRING OR GOUGING. MU NEW COIL CONNECTOR,PULL TEST TO 35K. HEAD UP WITH BHI. PRESSURE TEST. -ALL WORK COMPLETED IN ACCORDANCE WITHIN THE HOT WORK OPEN FLAME GUIDELINES 18:00 - 19:45 1.75 DRILL P PROD1 STAB ON. CHANGE PACKOFFS ON INJECTOR. PRESSURE TEST PACKOFFS AND LUBRICATOR TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES. PUMP SLACK FORWARD. PUMP AT 2 BPM FOR 40 BBL. OPEN WELL,CHECK FOR FLOW;STATIC. WELL TOOK 1 BBL TO FILL. Printed 10/20/2014 10:11:59AM North America-ALASKA-BP Page 6 of 15 Operation Summary Report Common Wet Name:G-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) • Start Date:9/24/2014 End Date:10/3/2014 X3-015LD-C:(1,640,247.00) • Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:OOAM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UW:500292021400 Active datum:RKB G-01A @70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:45 - 20:00 0.25 DRILL P PROD1 HOLD PJSM FOR MU DRILLING BHA. 20:00 - 21:00 1.00 DRILL P PROD1 POP OFF AND SET BACK THE INJECTOR AND LD NOZZLE. MU DRILLING BHA#10 WITH 2.7"X 3"HUGHES BIT AND 2 3/8"ULTRA X/LS MOTOR WITH '1.14°BEND STAB ON INJECTOR AND TEST QTS TO 250 PSI LOW/5000 PSI HIGH FOR 5 MINUTES. 21:00 - 23:30 2.50 DRILL P PROD1 RIH WITH DRILLING BHA AT 2 BPM IN/2.5 BPM OUT,AT 100 FPM. HOLD KICK WHILE TRIPPING DRILL PRIOR TO PASSING THROUGH THE WINDOW. RIH AND LOG TIE IN AT RA TAG(-11.5' •CORRECTION). RIH.TAG AT 10,090'TAKING WEIGHT • 23:30 - 00:00 0.50 DRILL P • PROD1 WASH AND REAM TIGHT HOLE FROM 10,084' TO 10,113' SWAP MUD SYSTEM TO NEW MUD WHILE REAMING DOWN THROUGH TIGHT HOLE. MAX OVER PULL 58K.CIRCULATE AT 1.43 BPM WITH 4109 PSI 9/28/2014 00:00 - 01:00 1.00 DRILL P PROD1 WASH AND REAM TIGHT HOLE FROM 10,113' •TO 10,160' SWAP MUD SYSTEM TO NEW MUD WHILE REAMING DOWN THROUGH TIGHT HOLE. MAX OVER PULL 58K.CIRCULATE AT 1.43 BPM WITH 4109 PSI 01:00 03:00 2.00 DRILL P PROD1 DRILL AHEAD FROM 10,160'. PERIODIC SHORT WIPER TRIPS. • DRILL 3"LATERAL SECTION • FREE SPIN=3561 PSI AT 1.61 BPM RATE IN=1.61 BPM RATE OUT=1.60 BPM ROP=19 FPH WOB=1.50 K CIRC PSI= 3633 PSI MW IN=9.51 PPG MW OUT=9.5 PPG ECD =11.23 PPG IAP=254 PSI OAP=123 PSI PVT=66 BBLS 03:00 - 06:00 3.00 DRILL P PROD1 DRILL AHEAD FROM 10,200'. PERIODIC SHORT WIPER TRIPS. DRILL 3"LATERAL SECTION • FREE SPIN=3561 PSI AT 1.61 BPM • • RATE IN=1.61 BPM RATE OUT=1.60 BPM ROP=19 FPH WOB=1.50 K CIRC PSI= 3640 PSI MW IN=9.5 PPG MW OUT=9.5 PPG ECD= 11.23 PPG IAP=410 PSI OAP=182 PSI PVT=305 BBLS • Printed 10/20/2014 10:11:59AM North America-ALASKA-BP Page 7 of 15 Operation Summary Report Common Well Name:G-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/24/2014 End Date:10/3/2014 X3-015LD-C:(1,640,247.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A @70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 16:45 10.75 DRILL P PROD1 DRILL AHEAD IN LATERAL SECTION FROM 10,265'. FREE SPIN OF 3800 PSI AT 1.70 BPM. -INITIAL DRILLING PRETTY STICKY. PICK UP FOR A WIPER WAS CLEAN AND WIPER SEEMED TO HELP WITH SLIDING.RECORD SLOW PUMP RATES ON FIRST WIPER TRIP OFF BOTTOM. I-DRILLING AT 1.55-1.70 BPM,3720-4330 PSI, COIL WEIGHT RANGING FROM 10.7-15.4K (BETTER WEIGHT TRANSFER AFTER WIPERS),ECD STEADY AT 11.3 PPG -MW IN 9.5 PPG,MW OUT 9.48 PPG,NO LOSSES TO FORMATION -PICKUPS OFF BOTTOM ARE CLEAN,PUW 30K. FAIRLY RATTY AS BHA IS PULLED UP HOLE. -CONTINUE WITH DRILLING AHEAD FOR GEOLOGICAL TARGETS AND INFORMATION. DRILL TO 8955'TVD,STILL IN SHALE. GEO REQUEST TO DRILL TO 10,450'FOR TARGET PICK AT-8950'TVD. CONTINUOUS SHALE AND CLAY BALLING ACROSS SHAKER. -ANNULAR PRESSURES INCREASING SLIGHTLY,STILL GETTING GOOD WOB YET COIL WEIGHT IS FALLING OFF BY 2-3K LBS. HAVING MORE FREQUENT STALLING ASSOCIATED WITH STICK-SLIPS. DIRECTIONAL DRILLER HAVING DIFFICULTY GETTING HOT TO ORIENT DUE TO STICKINESS. -PBTD CALLED AT 10,450'. FLOW CHECK OFF BOTTOM,ALL GOOD. 16:45 - 19:30 2.75 DRILL C PROD1 POH TO CHANGE OUT BHA FOR SIDETRACK PULLING UP HOLE VERY RATTY,PUW AVERAGING 30-32K. -4K OVERPULLAT 10,105' -PUW AVERAGING 33-34K FROM 10.100' -ORIENT STRING HIGH SIDE AND MINIMAL PUMPS ACROSS OH WHIPSTOCK TRAY,NO ISSUES CROSSING OPEN HOLE WHIPSTOCK TRAY -PICK UP TO WINDOW,PULL INTO WINDOW AND FLOW CHECK. ALL GOOD. OPEN EDC, JET ACROSS WHIPSTOCK TRAY,POH AT MAX RATE. -MW IN 9.48 PPG,MW OUT 9.55 PPG. SIGNIFICANT MIX OF SHARP SHALE AND CLAY BALL CUTTINGS STEADY ACROSS SHAKER WHILE POH. 19:30 - 20:30 1.00 DRILL C PROD1 FLOW CHECK;STATIC. HOLD PJSM,POP OFF INJECTOR AND PULL BHA TO SURFACE WHILE INSPECTING LAST 100'OF COIL FOR FURTHER GOUGING. LD DRILLING BHA#10. PICK UP BAKER 2.625"OPEN HOLE WHIPSTOCK WITH ANCHOR AND'J' HYDRAULIC SETTING TOOL. Printed 10/20/2014 10:11:59AM North America-ALASKA-BP Page 8 of 15 Operation Summary Report Common Well Name:G-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/24/2014 End Date:10/3/2014 X3-015LD-C:(1,640,247.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A @70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 23:15 2.75 DRILL C PROD1 PICK UP INJECTOR AND STAB ONTO WELL PRESSURE TEST QTS. RIH WITH BAKER OPEN HOLE WHIPSTOCK AND RUNNING TOOL LOG TIE IN TO FORMATION FROM 9285'TO 9306'.-12'CORRECTION CLOSE EDC,RECORD UP AND DOWN WEIGHTS 32K/ 19K. ORIENT TOOL TO HIGH SIDE. 23:15 - 23:45 0.50 DRILL C PROD1 RIH TO WINDOW AT 9501'. PASS THROUGH WINDOW WITH PUMP OFF WITH NO PROBLEM. RIH IN OPEN HOLE TO 9889'. TOP OF WHIPSTOCK AT 9880' PICK UP TO STRING WEIGHT. 23:45 - 00:00 0.25 DRILL C PROD1 SET OPEN HOLE WHIPSTOCK. PRESSURE UP TOOL TO 3700 PSI.NOTE GOOD INDICATION OF TOOL SET. SET DOWN 3K LBS TO CONFIRM ANCHOR IS SET. FLOW CHECK.OK. 9/29/2014 00:00 - 01:45 1.75 DRILL C PROD1 POH WITH OPEN HOLE WHIPSTOCK SETTING TOOL PULL THROUGH WINDOW WITH NO PROBLEMS. CLOSE EDC POH AT 110 FPM,CIRCULATE AT 1.8 BPM WITH 2911 PSI FLOW CHECK AT 200' • 01:45 - 02:30 0.75 DRILL C PROD1 PJSM ON HANDLING BHA. PICK UP INJECTOR AND HANG OVER CIRCULATING HOLE. POH AND LAY DOWN BHA. ALL TOOLS RECOVERED. PICK UP PARABOLIC DIAMOND MILL AND STRING REAMER BHA FOR SIDE TRACK STAB ON INJECTOR AND TEST QTS. 02:30 - 04:15 1.75 DRILL C PROD1 RIH WITH MILLING BHA WITH 2.73"MILL AND 2.74"STRING REAMER.MOTOR BEND SET AT 0.6° RIH AT 115 FPM.CIRCULATE AT 1.42 BPM WITH 2260 PSI. 04:15 - 05:00 0.75 DRILL C PROD1 LOG TIE IN TO RA MARKER FROM 9525'TO 9535'. -13'CORRECTION CLOSE EDC. RIH WITH MILLING BHA.PASS THROUGH WINDOW WITH NO PROBLEM. RIH AT 20 FPM.CIRCULATE AT.97 BPM WITH 1106 PSI. Printed 10/20/2014 10:11:59AM North America-ALASKA-BP Page 9 of 15 Operation Summary Report Common Well Name:G-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/24/2014 End Date:10/3/2014 X3-015LD-C:(1,640,247.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A @70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:00 - 13:30 8.50 DRILL C PROD1 TAG BOTTOM AT 9878' -TIME MILL SIDE TRACK HOLE FOR FIRST 1.5'. 1.65 BPM,3480 PSI,.1-.7K WOB. -MW IN 9.5 PPG,MW OUT 9.48 PPG,ECD 11.0 PPG -BEGIN MILLING BASED UPON WOB AND DIFFERENTIAL PARAMETERS. FREE SPIN OF 3490 PSI AT 1.65 BPM. DRILLING CONSISTENT,UTILIZING 300 PSI DIFFERENTIAL AND WOB AS LIMIT FOR DRILL OFF. 1.65 BPM,3600-3890 PSI,2.9-3.8K WOB,ECD 11.0 PPG,MW IN 9.51 PPG,MW OUT 9.48 PPG -MILL TO 9890',CONDUCT DRY DRIFT THROUGH MILLED SECTION. DRIFT DOWN WAS CLEAN,CLEAN ON PICKUP. FLOW CHECK OFF BOTTOM,ALL GOOD. 13:30 - 14:45 1.25 DRILL C PROD1 POH WITH PARABOLIC MILL AND STRING MILL BHA. ON TRIP UP,MOTOR WORK AND OVERPULL INDICATE POSSIBLE ROUGH EDGE ON BOTTOM OF OH TRAY SET AT 9775'. CONDUCT REAM AND BACKREAM PASSES BY AREA AS MITIGATION OF ANY SHARP OR DAMAGED EDGE. -100-125 PSI OF MOTORWORK WHILE CONDUCTING REAM PASSES THROUGH AREA. INITIAL SOW 16.5-18K. CONDUCT TWO PASSES,CONDUCT DRY PASS AND AREA LOOKS GOOD. 14:45 - 16:30 1.75 DRILL C PROD1 POH WITH BHA. PULL INTO WINDOW,FLOW CHECK. ALL GOOD. OPEN EDC,POH AT 2.258 BPM,3750 PSI. PULL TO SURFACE, FLOW CHECK WELL. ALL GOOD. PJSM ON LAYING DOWN BHA. 16:30 - 18:00 1.50 DRILL C PROD1 POP OFF. INSPECT COIL FOR ANOMOLIES,IN GOOD CONDITION. LD BHA WITH NO ISSUES. MU 3.0"BUILD BHA ON 2.46°BEND. STAB ON, PRESSURE TEST QUICK TEST SUB. 18:00 - 20:30 2.50 DRILL C PROD1 RIH WITH LATERAL BHA. LOG TIE-IN AT RA TAG WITH-17'CORRECTION. OBTAIN SPRS AND CONTINUE RIH.TAG AT 9890' 20:30 - 22:00 1.50 DRILL C PROD1 DRILL AHEAD FROM 9890'TO 10,005'. END OF BUILD SECTION DRILL 3"BUILD SECTION FREE SPIN=3590 PSI AT 1.68 BPM RATE IN=1.65 BPM RATE OUT=1.61 BPM ROP=19 FPH WOB=1.50 K CIRC PSI= 3450 PSI MW IN=9.48 PPG MW OUT=9.3 PPG ECD =11.23 PPG IAP=660 PSI OAP=625 PSI PVT=298 BBLS ROP INCREASED WHEN DRILLING IN THE 1B FORMATION. REDUCE PUMP RATE TO HOLD WOB 22:00 - 22:45 0.75 DRILL C PROD1 CIRCULATE AT 1.72 BPM WITH 3684 PSI POH SLOWLY TO WINDOW OPEN EDC.FLOW CHECK AT WINDOW. 22:45 - 00:00 1.25 DRILL P PROD1 POH WITH BUILD BHAAT 78 FPM.CIRCULATE AT 2.13 BPM WITH 3724 PSI Printed 10/20/2014 10:11:59AM North America-ALASKA-BP Page 10 of 15 Operation Summary Report Common Well Name:G-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/24/2014 End Date:10/3/2014 X3-015LD-C:(1,640,247.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A @70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 9/30/2014 00:00 - 00:15 0.25 DRILL C PROD1 POH WITH BUILD BHA AT 110 FPM. CIRCULATE AT 2.1 BPM WITH 3500 PSI. FLOW CHECK PRIOR TO PULLING THROUGH STACK;STATIC. 00:15 - 00:30 0.25 DRILL C PROD1 HOLD PJSM FOR HANDLING BHA. 00:30 - 01:30 1.00 DRILL C PROD1 POP OFF INJECTOR AND INSPECT 100'COIL FOR GOUGING;NO DAMAGE. STAND BACK BHA TO FLOATS;CHANGE OUT MOTOR,MU BIT AND STAB ON INJECTOR WITH LATERAL BHA#14 WITH 3"BICENTER BIT AND 2-3/8"BHI ULTRA X/LS,1.14°MOTOR. TEST QTS TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES. 01:30 - 03:45 2.25 DRILL C PROD1 RIH WITH LATERAL BHAAT 110 FPM AND 1.7 BPM IN/2.1 BPM OUT. LOG TIE-IN AT RA TAG;(-15.5'CORRECTION). OBTAIN SPR AND RUN TO BOTTOM. TAG TD AT 10,002'. • 03:45 - 06:00 2.25 DRILL C PROD1 DRILL 3"LATERAL SECTION FROM 10,002'. FREE SPIN=3480 PSI AT 1.63 BPM RATE IN=1.77 BPM RATE OUT=1.76 BPM ROP=45 FPH WOB=2.1 K CIRC PSI= 3850 PSI MW IN=9.50 PPG MW OUT=9.48 PPG ECD =11.18 PPG IAP=565 PSI OAP=592 PSI PVT=296 BBLS 06:00 - 10:30 4.50 DRILL C PROD1 PICKUP CLEAN OFF BOTTOM FROM 10,100'. RECORD SLOW PUMP RATES. DRILL AHEAD FROM 10,100'. FREE SPIN 3560 PSI AT 1.70 BPM. -GOOD DRILLING CONDITIONS PRIMARILY ON CLEAN SAND DURING THIS INTERVAL. -1.70-1.75 BPM,3815-3890 PSI,1.9-2.4K WOB, ECD 11.2 PPG -MW IN 9.52 PPG,MW OUT 9.53 PPG 10:30 - 11:00 0.50 DRILL C PROD1 EXTENDED WIPER UP TO 9900'. PICKUP CLEAN. PUW ON TRIP UP 32K,SOW ON TRIP DOWN 17K. NO ISSUES ON TRIP. 11:00 - 14:30 3.50 DRILL C PROD1 DRILL AHEAD FROM 10,250'. FREE SPIN 3800 PSI AT 1.8 BPM. -1.72-1.75 BPM,3715-4000 PSI,1.7-2.9K WOB, ECD 11.3 PPG -MW IN AND OUT 9.52 PPG 14:30 - 15:00 0.50 DRILL C PROD1 SHORT 150'WIPER AFTER DRILLING 150'. PICK UP CLEAN,PUW ON TRIP UP 31.5K. SOW ON TRIP DOWN 18K. 15:00 - 15:45 0.75 DRILL C PROD1 DRILL AHEAD FROM 10,400'. FREE SPIN 3600 PSI AT 1.65 BPM. -1.65-1.75 BPM,3900-4050 PSI,1.95-3K WOB, ECD 11.3 PPG -MW IN 9.51 PPG,MW OUT 9.53 PPG 15:45 - 16:30 0.75 DRILL P PROD1 CONTINUE DRILLING AHEAD IN LATERAL SECTION WITH CHANGE BACK TO PLANNED OPERATION. -1.65-1.75 BPM,3900-4050 PSI,1.95-3K WOB, ECD 11.3 PPG -MW IN 9.52 PPG,MW OUT 9.55 PPG DRILL TO 10,500' Printed 10/20/2014 10:11:59AM North America-ALASKA-BP Page 11 of 15 Operation Summary Report Common Well Name:G-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/24/2014 End Date:10/3/2014 X3-015LD-C:(1,640,247.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:OOAM Rig Release:10/8/2014 Rig Contractor NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A @70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:30 - 19:15 2.75 DRILL P PROD1 GEO REQUEST WIPER TO WINDOW FOR DEPTH CONTROL. FLOW CHECK OFF BOTTOM,POH TO WINDOW. PUW ON TRIP 32K. PULL INTO WINDOW,LOG TIE-IN WITH +7.5'CORRECTION. PICK BACK UP,LOG CCL. RUN BACK DOWN TO CURRENT TD OF 10,500'. SOW TO BOTTOM 19K. 19:15 - 22:15 3.00 DRILL P PROD1 DRILL AHEAD FROM 10,500'TO 10,665'.FREE SPIN AT 3600 PSI AT 1.63 BPM. -1.68-1.72 BPM,3870-3911 PSI,2.3-2.9K WOB, ECD 11.3 PPG. -MW IN 9.54 PPG,MW OUT 9.52 PPG. -CROSSED POSSIBLE SMALL FRACTURE AT 10640'.NO SIGNS OF FAULT. 6 BBLS LOST TO FORMATION DURING THIS SECTION. 22:15 - 23:00 0.75 DRILL P PROD1 CONDUCT WIPER TRIP FROM 10,665'TO 9,900'. -PUW 33K,SOW 15.5K. 23:00 - 00:00 1.00 DRILL P PROD1 DRILL AHEAD FROM 10,665'TO 10,710'FREE SPIN AT 3600 PSI AT 1.67 BPM. -1.71-1.74 BPM,3870-4175 PSI,2.35-2.58K WOB,ECD 11.28 PPG. -MW IN 9.55 PPG,MW OUT 9.54 PPG. 2 BBLS LOST TO FORMATION DURING THIS SECTION. 10/1/2014 00:00 - 03:15 3.25 DRILL P PROD1 DRILL AHEAD FROM 10710'TO 10887',FREE SPIN AT 1.72 BPM-3600 PSI. -1.66-1.74 BPM,4036-4175 PSI,2.35-2.74K WOB -MW IN 9.55 PPG,MW OUT 9.54 PPG,ECD 11.28 PPG. 5 BBLS LOST TO FORMATION DURING THIS SECTION. 03:15 - 04:00 0.75 DRILL P PROD1 WIPER TRIP FROM 10887'TO 9950'. PUW 31.6K,SOW 16.5K 04:00 - 05:00 1.00 DRILL P PROD1 DRILL AHEAD FROM 10887'TO 10950',FREE SPIN AT 3550 PSI AT 1.74 BPM. -1.65-1.71 BPM,4025-4155 PSI,2.40-2.80 K WOB -MW IN 9.56 PPG,MW OUT 9.61 PPG,ECD 11.28 1 BBL LOST TO FORMATION DURING THIS SECTION 05:00 - 06:00 1.00 DRILL P PROD1 WIPER TRIP/TIE IN TO RA TAG. PULL OUT OF HOLE TO 9525'(BIT DEPTH) AND TIE IN TO RA TAG AT 9507'. -PUW 35.2K, 06:00 - 07:00 1.00 DRILL P PROD1 LOG TIE-IN WITH+5'CORRECTION. CONTINUE WITH TRIP BACK DOWN. SOW 17K. WORK THROUGH 9950',HAVE TO CUT DOWN ON PUMPS TO MAKE IT THROUGH. -CONTINUE DOWN TO CURRENT TD WITH NO ISSUES. Printed 10/20/2014 10:11:59AM North America-ALASKA-BP Page 12 of 15 Operation Summary Report Common Well Name:G-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/24/2014 End Date:10/3/2014 X3-015LD-C:(1,640,247.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A @70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:00 - 09:15 2.25 DRILL P PROD1 ON BOTTOM TO DRILL AHEAD FROM 10,950' FREE SPIN OF 3640 PSI AT 1.65 BPM. -STACKING DOWN WITH GOOD COIL WEIGHT TRANSFER OF 9.5K AND WOB OF 3.4-4K YET VERY LITTLE MOTORWORK. ONLY READING 90-180 POUNDS OF DIFFERENTIAL MOTORWORKWITH SIGNIFICANT WOB. ATTEMPT VARYING FLOWAND WOB TO GET MOTORWORK. CALL FROM TOWN GEO WITH REQUEST TO DROP 13'OF TVD TO GET INTO THE ZONE 1A. THIS WILL REQUIRE TO CROSS THE SHALE CAP,POSSIBLY BACK INTO THE CLAY. -PICK UP,MOVE DOWN AND APPLY 5K WOB. GIVES US 350-400 POUNDS OF DIFFERENTIAL MOTORWORK;STILL HAVE VERY GOOD COIL WEIGHT TRANSFER AND WOB APPLICATION. -SWAP MUD WHILE DRILLING TO SEE IF IT HELPS. WITH MUD AROUND,WOB TO DIFFERENTIAL PRESSURE CORRELATION MUCH BETTER,ROP DOUBLED. SOW HAS DOUBLED FROM-8K TO 16K. RECORD SLOW PUMP RATES,DRILL AHEAD. WITH NEW MUD SYSTEM,MW IN AND OUT 9.5 PPG,ECD DID NOT REDUCE-HOLDING AT 11.4 PPG. 09:15 - 12:30 3.25 DRILL P PROD1 DRILL AHEAD FROM 11,000'. FREE SPIN WITH NEW MUD AROUND 3700 PSI AT 1.68 BPM. -1.70 BPM,3840-4170 PSI,1.8-4.0K WOB,ECD 11.4 PPG -MW IN AND OUT 9.5 PPG,NO LOSSES TO FORMATION 12:30 - 14:00 1.50 DRILL P PROD1 PICK UP OFF BOTTOM CLEAN. SLIGHT OVERPULLAT 11,050'AND AT 10,250'ON TRIP UP. PUW ON TRIP UP 30K. PULL TO 9900', TURN AROUND AND BEGIN TO RUN BACK DOWN. SOW 18K WHILE TRIPPING DOWN TO TD. 14:00 - 17:15 3.25 DRILL P PROD1 DRILL AHEAD FROM 11,165'. FREE SPIN 3560 PSI AT 1.65 BPM. -1.65 BPM,3750-4090 PSI,2.3-4K WOB,ECD 11.5 PPG,ROP RELATIVELY HIGH AT 45-60 FPH -ABLE TO STACK DOWN WOB AND ALLOW TO DRILL OFF WITHOUT STALLING WITH GOOD DIFFERENTIAL PRESSURES -ECD AND CIRCULATION PRESSURES CLIMBING,COIL WEIGHT TRANSFER DROPPED ALMOST IN HALF. CHOOSE TO CONDUCT LONG WIPER. -MW IN 9.51 PPG,MW OUT 9.52 PPG,NO SIGNIFICANT LOSSES TO FORMATION- MAJORITY OF SLIGHT LOSSES ATTRIBUTED TO FOOTAGE DRILLED AND CUTTINGS OVER SHAKER 17:15 - 20:00 2.75 DRILL P PROD1 WIPER TO 9950'. PICK UP CLEAN,PUW DURING TRIP 31-35.5K. ECD'S DROPPED DOWN FROM 11.5 PPG TO 11.2 PPG. Printed 10/20/2014 10:11:59AM North America-ALASKA-BP Page 13 of 15 Operation Summary Report Common Well Name:G-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/24/2014 End Date:10/3/2014 X3-015LD-C:(1,640,247.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A©70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:00 - 23:00 3.00 DRILL P PROD1 DRILL AHEAD FROM 11,300'TO 11,525'.FREE SPIN AT 1.68 BPM-3740 PSI. -1.66-1.68 BPM,4050-4237 PSI,3.2-3.8 WOB, 11.7 PPG ECD. 1-MW IN 9.56 PPG,MW OUT 9.45 PPG. -WAS ABLE TO STACK WEIGHT ON BIT,BUT SHOWED VERY LITTLE MOTOR WORK.PICK UP AND MAKE SMALL WIPER TRIPS THE LENGTH OF BHA. -COIL WEIGHT TRANSFER RATTY.WE WOULD STACK WEIGHT THEN IT WOULD DRILL OFF QUICKLY. -CONTINUE TO WORK IT UNTIL IT CLEARED UP(DEPTH OF PROBLEM 11475'TO 11499). -AFTER DRILLING THRU THIS SECTION,ROP DOUBLED AND SMOOTHED OUT,BUT STILL HAD HIGH WOB(BUT STABILIZED),AND HIGH ECD.WEIGHT TRANSFER PROBLEMS SETTLED DOWN. 4 BBS LOST TO FORMATION WHILE DRILLING THIS FORMATION. 'PERFORMED COIL PINHOLE DRILL WITH RIG CREWAND SUPPORT CREW. 23:00 - 00:00 1.00 DRILL P PROD1 PERFORM WIPER TRIP TO CLEAN HOLE. -PICK UP OFF BOTTOM CLEAN.PUW 31.5K, SOW 14.5K. -WIPE TO 11,000'WITH H NO PROBLEMS. 10/2/2014 00:00 - 03:00 3.00 DRILL P PROD1 DRILL AHEAD FROM 11525'TO 11751',FREE SPIN 3825 PSI. -1.60 BPM,4025-4195 PSI,ECD 11.7 PPG. -MW IN 9.54 PPG,MW OUT 9.42 PPG, 3.75-4.1K WOB. GEO INDICATIONS SKIMMING TOP OF HOT ZONE.STEERING UP TO TVD OF 8940'AND UP TO TRY TO CLEAR THE HOT ZONE.HOT TAR IN SAMPLES. DRILLING IS CONSISTENT IN THIS SECTION, JUST USING HEAVY WOB,SEEING GOOD MOTORWORK,BUT HIGH PUMP PRESSURES. 4 BBLS FLUID LOST TO FORMATION WHILE DRILLING THIS SECTION. 03:00 - 04:30 1.50 DRILL P PROD1 PERFORM WIPER TRIP/TIE IN TRIP. -PULL OUT OF HOLE FROM 11751'TO 9491' FOR TIE IN AND WIPER. -PULL OFF OF BOTTOM WITH NO PROBLEMS, TRIP OUT OF HOLE WITH NO PROBLEMS. -PUW 33.0K. 04:30 - 06:30 2.00 DRILL P PROD1 PERFOM TIE IN AT 9491'(-9.5'OF CORRECTION). -RUN IN HOLE WITH COIL TUBING TO 11751'. -DIFFICULTY RUNNING THROUGH 11,250'. CONTINUE DOWN TO CURRENT TD WITH MINIMAL PUMP RATE. -AVERAGE SOW 15.5K. 06:30 - 09:45 3.25 DRILL P PROD1 ON BOTTOM. DRILL AHEAD FROM 11,751'. FREE SPIN 3600 PSI AT 1.60 BPM. -1.35-1.55 BPM,3625-4050 PSI,.35-5K WOB, ECD 11.5 PPG -PUMP 10 BBL CLEAN FLUID PILL IN ATTEMPT TO HELP WITH TRANSITION,DID NOT HELP. -MW IN AND OUT 9.55 PPG Printed 10/20/2014 10:11:59AM North America-ALASKA-BP Page 14 of 15 Operation Summary Report Common Well Name:G-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/24/2014 End Date:10/3/2014 X3-015LD-C:(1,640,247.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A @70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:45 - 11:15 1.50 DRILL P PROD1 WIPER TRIP TO CLEAN UP CUTTINGS,HELP WITH WEIGHT TRANSITION. REAM DOWN TO POLISH UP ANY ROUGH AREAS,REAM PASS WENT WELL. SOW 12-15K ON TRIP DOWN WHILE REAMING. 11:15 - 13:30 2.25 DRILL P PROD1 DRILL AHEAD FROM 11,864'. FREE SPIN OF 3850 PSI AT 1.60 BPM,3150 PSI AT 1.25 BPM. -1.35-1.55 BPM,3550-4190 PSI,2.1-4.3K,ECD 11.6 PPG -PUMP 20 BBL LO-VIS SWEEP WITH ADDITIONAL LUBRICANTS. CIRCULATION PRESSURES DROPPED BY-500 PSI WITH PILL AROUND,DRILLING ROP PICKED UP, DRILL TO 11,950'WITH NEGATIVE COIL WEIGHT -MW IN 9.55 PPG,MW OUT 9.58 PPG,VERY SLIGHT LOSSES TO FORMATION 13:30 - 16:45 3.25 DRILL P PROD1 INITIAL WIPER TRIP UP TO 9950'. PICKUP CLEAN FROM BOTTOM. PUW ON TRIP 30-32K. SLIGHTLY RATTY AT 11,030'. CONTINUE ON TRIP UP WITH NO ISSUES. TURN AROUND AT 9950'. MOVE BACK DOWN WITH NO ISSUES UNTIL MOTORWORKAT 10,850'. SOW HAD BEEN AVERAGING 18K. PICK UP,REAM THROUGH SECTION. CONTINUE DOWN,REAM THROUGH 10,985' WITH LITTLE ISSUE. RIH REAMING DOWN. TAG ON BOTTOM. LOSS OF 5 BBLS ON THE INITIAL WIPER TRIP. "NOTIFIED AOGCC OF INTENT TO TEST BOP ON 10/4/2014 AT 04:00 AM.NOTIFICATION SENT 10/2/2014 AT 04:28 PM. 16:45 - 18:00 1.25 DRILL P PROD1 WIPER BACK TO WINDOW AT 1.75 BPM,4010 PSI. MW IN AND OUT 9.56 PPG. NO ISSUES PICKING UP HOLE. PUW 31.5K. 18:00 - 20:15 2.25 DRILL P PROD1 PULL INTO WINDOW,OPEN EDC,CIRCULATE BOTTOMS UP. LOG TIE-IN WITH+7.5" CORRECTION. CLOSE EDC,RUN BACK TO BOTTOM TO CORRECT TD. CORRECTED TD OF 11,953'. • 20:15 - 22:30 2.25 DRILL P PROD1 HOLE WAS STICKY ON TRIP BACK IN AFTER TIE IN.PERFORM WIPER TRIP BACK UP TO 11,880'WITH NO OVERPULL. -STILL STICKY ON TRIP BACK DOWN.ABLE TO TRIP IN HOLE WHEN WE SLOWED PUMP RATES DOWN FROM 1.6 BBLS/MIN TO.5 BBLS/MIN.PULL OUT OF HOLE TO 11,860' WITH NO OVERPULL. -WIPE BACK DOWN TO TD WITH NO PROBLEMS THIS TIME.PUW 31.5K,SOW 14.5K ON FINAL TRIP. -LINE UP AND PUMP 24 BBLS OF LINER PILL AT 1.69 BPM WHILE IN COIL TUBING.WORK COIL UP AND DOWN WHILE SENDING PILL TO BOTTOM. -SLOW DOWN PUMPS TO.3 BPM WHEN PILL HIT BIT AND START PULLING OUT OF HOLE TO SPOT PILL. -PULL OUT OF HOLE TO WINDOW WHILE SPOTTING PILL(9501'). 9 BBLS TOTAL LOST WHILE PERFOMING WIPER TRIPS. Printed 10/20/2014 10:11:59AM North America-ALASKA-BP Page 15 of 15 Operation Summary Report Common Well Name:G-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/24/2014 End Date:10/3/2014 X3-015LD-C:(1,640,247.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:OOAM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A @70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:30 - 22:45 0.25 DRILL P PROD1 FLOWCHECK WELL AT WINDOW-WELL STATIC 22:45 - 00:00 1.25 DRILL P PROD1 PULL OUT OF HOLE WITH DRILLING BHA. -NO OVERPULL ENCOUNTERED. -PUMP AT 2 BPM WHILE PULLING OUT OF HOLE. -PAINT FLAGS AT 9230'AND 6780'(EOP) 10/3/2014 00:00 - 00:30 0.50 DRILL P PROD1 PULL OUT OF HOLE WITH DRILLING BHA. -NO OVERPULL ENCOUNTERED. -PUMP AT 2 BPM WHILE PULLING OUT OF HOLE. 00:30 - 01:00 0.50 DRILL P PROD1 FLOW CHECK WELL AT BHA-WELL STATIC. -PJSM ON LAY DOWN BHA. 01:00 - 01:45 0.75 DRILL P PROD1 PULL AND LAY DOWN BHA. -BIT GRADE 1-2-BT-S-X-1-PN-TD **SWITCH TO CON EVENT REPORT#16B Printed 10/20/2014 10:11:59AM North America-ALASKA-BP Page 1 of 11 Operation Summary Report Common Well Name:G-01 AFE No Event Type:COM-ONSHORE(CON) Start Date:10/3/2014 End Date:10/8/2014 X3-015LD-C:(1,655,277.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01 A @70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10/3/2014 01:45 - 02:15 0.50 BOPSUR P RUNPRD FUNCTION TEST ALL BOPE ON 2"AND 2-3/8" TEST JOINTS FROM DRILLER CONSOLE. 02:15 02:30 0.25 CASING P RUNPRD REMOVE UPPER QUICK CONNECT. 02:30 - 04:30 2.00 CASING P RUNPRD PREP TO PUMP E-LINE SLACK. -CLOSE SWAB VALVE,MASTER VALVE AND SSV. -PERFORM LEAKTITE TEST ON SWAB VALVE-GOOD TEST. -INSTALL NIGHTCAP AND TEST QTS-GOOD 'TEST. -FILL OUT AND FULFILL HOT WORK PERMIT SPECIFICATIONS. -INSTALL RUBBER BOOT ON E-LINE END. -OPEN MASTER VALVE AND SSV. -OPEN WELL AGAINST NIGHT CAP AND CHECK FOR PRESSURE-WELL ON VAC. -REMOVE NIGHT CAP AND FILL WELL-1.5 BBLS TO FILL. -FLOWCHECK WELL-WELL STATIC. 04:30 - 05:00 0.50 CASING P RUNPRD PICK UP 2 JOINTS OF CSH PIPE AND RUN IN HOLE. -MAKE UP COIL TUBING TO CSH PIPE AND STAB INJECTOR ONTO WELL. 1.-TEST QUICK TEST SUB-GOOD TEST. 05:00 - 06:00 1.00 CASING P RUNPRD PUMP E-LINE SLACK OUT OF COIL TUBING. 06:00 - 10:00 4.00 CASING P RUNPRD POP OFF,DISPOSE OF E-LINE. LD CSH WORK JOINTS. SECURE WELL,INSTALL NIGHTCAP. PREP COIL FOR CONNECTOR. INSTALL CONNECTOR,PULL TEST TO 35K, PRESSURE TEST. ALL GOOD. STAB ON, PUMP 3/4"DRIFT BALL. POP OFF,RECOVER BALL. BOOT CAME OFF DURING PUMPING; RE-SECURE WELL AND INSTALL NEW BOOT ON E-LINE. OPEN UP TO WELL,NO PRESSURE AND NO FLOW. TOOK 2 BBLS TO FILL. 10:00 - 11:00 1.00 CASING P RUNPRD RIG UP FOR MAKING UP LINER ASSEMBLY. PJSM ON MAKING UP LINER PER WELL PROGRAM AND LINER SUMMARY. Printed 10/20/2014 10:12:23AM North America-ALASKA-BP Page 2 of 11 Operation Summary Report Common Well Name:G-01 AFE No Event Type:COM-ONSHORE(CON) Start Date:10/3/2014 End Date:10/8/2014 1X3-015LD-C:(1,655,277.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A @70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 15:30 4.50 CASING P RUNPRD MU LINER ASSEMBLY PER WELL PLAN: 6 EACH 2-3/8"L-80 TH511 PUP JOINTS,37.93' LONG,WITHOUT CEMENTRALIZERS PLACED DIRECTLY ABOVE LANDING COLLAR OF 1 SHOE TRACK. 10'MARKER JOINTS WITH RA TAGS PLACED BETWEEN JOINTS 27 AND 28 AND BETWEEN JOINTS 50 AND 51. -GOOD CATCH BY CREW: TWO JOINTS KICKED OUT OF RUN DUE TO BEING STL. DISCUSSED THIS WITH BP STORES,PIPE IS SEGREGATED BY THREAD PROTECTOR COLOR. HAD A GOOD CONVERSATION WITH CREW ON IMPORTANCE OF ENSURING THAT WE PLACE PROPER COLOR THREAD PROTECTORS BACK ONTO PIPE WE OFFLOAD AND ALSO TO ENSURE TO KEEP UP THE GOOD JOB OF MONITORING THE STAMP AS WE RECEIVE AND READY PIPE FOR USE. SEE IR 4832233 FOR INCIDENT REPORT. -FILL TUBING,MONITOR WELL,RECORD DISPLACEMENT PER NORDIC FLUID MANAGEMENT PROCEDURE CONDUCT KICK DRILL WHILE MAKING UP LINER ASSEMBLY. VERY GOOD CREW RESPONSE;CTS EQUIPMENT OPERATOR STEPPED UP AND STABBED FLOOR VALVE AND GRABBED KEY TO CLOSE,FLOORHAND WENT TO ACCUMULATOR DUE TO MOTORMAN OFF OF RIG,ROUSTABOUT MANNED PITS AND LOOKED FOR FLOW,CTS EQUIPMENT OPERATOR WENT TO CELLAR AFTER STABBING FSV TO MONITOR HCR AND ANNULAR BAG CLOSURE. GOOD DRILL OVERALL. CONDUCT AAR,STRENGTHEN EXPECTATION THAT PEOPLE SHOULD ALWAYS TRAIN UP IN CASE THEY HAVE TO STEP UP,AS IN THE CASE OF THIS DRILL. -MAKE UP LINER RUNNING ASSEMBLY TO BHA. CONTINUE TO MAKE UP WORK STRING TO ASSEMBLY. STAB ON WITH INJECTOR. Printed 10/20/2014 10:12:23AM North America-ALASKA-BP Page 3 of 11 Operation Summary Report Common Well Name:G-01 AFE No Event Type:COM-ONSHORE(CON) Start Date:10/3/2014 End Date:10/8/2014 X3-015LD-C:(1,655,277.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A©70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:30 - 18:30 3.00 CASING P RUNPRD PRESSURE TEST QUICK TEST SUB. ALL GOOD. RIH WITH ASSEMBLY. -COIL TUBING WEIGHT NOT CORRELATING BETWEEN WEIGHT INDICATOR AND CCAT COMPUTATIONS. CTS TECHNICAN COMING OUT TO RIG. HE WAS ABLE TO RESET THE DISPLAY,WEIGHTS ARE NOW CORRELATED AND CORRECT. -RIH,CORRELATE TO WINDOW FLAG WITH -8'CORRECTION. PUW IN WINDOW—28K. -CONTINUE TO RIH INTO OPEN HOLE. BEGIN TO HAVE TO WORK PIPE DOWN FROM 11,250'. PICKUPS CLEAN. SOW RUNNING IN HOLE 10-11.5K. RELATIVELY STICKY AT •11,875-11,920'. WORK PIPE DOWN. -LAND LINER ON BOTTOM AT 11,963' UNCORRECTED MD. SET DOWN TO 11,964' WITH 8K. -SIMOPS: -ALL FLUIDS ON LOCATION AND STAGED. CEMENTERS ON LOCATION AND RIGGED UP. -UPDATED AOGCC WITH STATUS AT 1730 HRS 18:30 - 21:00 2.50 CASING P RUNPRD PJSM ON BALL DROP FOR SETTING LINER HANGER. LAUNCH 5/8"BALL,PUMP DOWN. -PUMP AT 1.3 BBLS/MIN @ 4200 PSI. AT 30 BBLS AWAY,SLOW TO.5 BBLS/MIN. NO PRESSURE INCREASE OBSERVED. -AT 50 BBLS AWAY,SHUT DOWN AND PICKED UP ON STRING TO BREAKOVER POINT+2'. ORIGINAL PUW=32.5K,PUW NOW 25K INDICATING SHEARING AND RELEASING OF LINER TOP. -SLACK OFF AND STACK 10K ON TOP OF LINER IN PREPARATION TO CEMENT. 21:00 - 00:00 3.00 CEMT P RUNPRD DISPLACE TO KCL AND CONDITION WELLBORE FOR CEMENT JOB. -CIRCULATION PRESSURE OF 4230 PSI AT 1.43 BPM. -EMPTY PITS OF OLD MUD AND LOAD PITS WITH NEW KCL. 'SIM-OPS:WORK SLACK OUT OF COIL ON REEL IN REEL HOUSE.(STARTED AT 23:15). 10/4/2014 00:00 - 02:30 2.50 CEMT N SFAL 11,953.00 I RUNPRD COIL TUBING DEVELOPED SLACK IN COIL REEL.PREPARE AND REVIEW JSEA FOR MANIPULATING REEL TO WORK ON COIL WRAPS. -WORK COIL TO RE-POSITION COIL WRAPS IN ORDER TO GET SLACK OUT OF COIL TUBING. -SEE IR 4832639 FOR INCIDENT REPORT Printed 10/20/2014 10:12:23AM North America-ALASKA-BP Page 4 of 11 Operation Summary Report Common Well Name:G-01 AFE No Event Type:COM-ONSHORE(CON) Start Date:10/3/2014 End Date:10/8/2014 X3-015LD-C:(1,655,277.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01 A @70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:30 - 06:00 3.50 CEMT P RUNPRD PRE-JOB WITH SLB,NORDIC,CTS,BTT AND CH2MHILL. WALK LINES,REVIEW PRESSURE CROSSCHECK LIST,SLB PUMPED 5 BBLS KCL DOWNHOLE,CONDUCT PRESSURE TEST FOR CEMENT PUMP KICKOUTS PER WELL •PLAN AND PROCEDURE,PT CEMENTING LINES;PT OF LINES WERE GOOD. -BATCH UP 16 BBLS OF 15.8 PPG CEMENT 'WITH 1.17 CU/FT SACK YIELD,CONDUCT LAST WALK THROUGH OF LINES. -BATCH TIME 04:26 WITH 4 HRS,25 MIN PUMPABLE TIME-CEMENT AT DENSITY AT 0426 HRS. LINE UP,AND BEGIN PUMPING CEMENT AT 0433 HRS. -PUMP 11.8 BBLS OF 15.8 PPG CEMENT. INITIAL CIRC PRESSURE AT 3200 PSI AT 1.0 BPM. FINAL CIRC PRESSURE 3600 PSI AT 1.00 BPM.CEMENTERS SWAPPED TO BIOZAN AND PUMPED 15 BBLS BIOZAN DOWNHOLE AT 3900 PSI AT RATE OF.95 BPM -FINAL RATE AND PRESSURE 1.27 BPM AT 3950 PSI.SWAP OVER TO RIG PUMPS AND DISPLACE WITH 8.5 PPG CONTAMINATION •FLUID(KCL BASE POWERVIS). INITIAL DISPLACEMENT 1.17 BPM,INCREASE TO 1.4 BPM. SHUT DOWN WITH 2 BBLS CEMENT ABOVE LINER WIPER PLUG-PICK UP TO BREAKOVER PLUS 10 FEET,OPEN BAKER CHOKE AND PUMP THRU SIDE EXHAUST 2 BBLS CEMENT AND 4 BBLS CONTAMINATION FLUID -SET BACK DOWN,BRING UP PUMPS AND SHEAR LINER WIPER PLUG AT.4 BBLS,3700 PSI. CONTINUE WITH DISPLACING LINER WIPER PLUG AT.72 BPM,4120 PSI. -DID NOT SEE INDICATION OF PLUG BUMP AT 9.9 BBLS.FINAL DISPLACEMENT.5 BPM AT 4450 PSI,OPEN BAKER CHOKE,BLEED PRESSURE. -CHECK FLOATS,EVERYTHING GOOD;CIPAT 05:50 HRS -SLOWLY RELEASE FROM LINER DEPLOYMENT SLEEVE WITH—700 PSI -BEGIN DISPLACEMENT WITH 5 BBLS OF CONTAMINATION FLUID ABOVE DEPLOYMENT SLEEVE 06.00 - 08.30 2.50 CEMT P RUNPRD POH CONTAMINATING CEMENT EXCESS IN WELLBORE. PULL TO SURFACE,FLOW CHECK. FLOW CHECK ALL GOOD. PJSM ON LAYING DOWN RUNNING BHA. 08:30 - 09:00 0.50 CEMT P RUNPRD POP OFF,STAND BACK INJECTOR. LAY DOWN WORK STRING AND RUNNING TOOL. 5/8"BALL RETRIEVED. OFFLOAD RUNNING TOOLS. Printed 10/20/2014 10:12:23AM North America-ALASKA-BP Page 5 of 11 Operation Summary Report Common Well Name:G-01 AFE No Event Type:COM-ONSHORE(CON) Start Date:10/3/2014 End Date:10/8/2014 X3-015LD-C:(1,655,277.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A @70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 14:00 5.00 BOPSUR P OTHCMP CLEAR AND CLEAN RIG FLOOR. MOBILIZE EQUIPMENT FOR SUCKING OUT STACK OPENING UP TO BOP. -CONDUCT LEAK TIGHT PRESSURE TEST FOR OPENING UP DOORS;LOCK OUT ACCUMULATOR PER PROCEDURE FOR BOP TESTING INSPECT DOOR SEALS. CHANGE OUT RAMS TO 1"CSH WORK STRING RAMS. 14:00 - 00:00 10.00 BOPSUB P OTHCMP CONDUCT BOP TEST IN ACCORDANCE WITH AOGCC REGULATIONS,BP REQUIREMENTS, AND NORDIC PROCEDURES. -AOGCC REP WAIVED WITNESS TO TEST ON 10/4/2014. TEST ALL AUDIBLE AND VISUAL ALARMS CONDUCT ACCUMULATOR DRAWDOWN ,TEST -ANNULAR ELEMENT FAILED BOP TESTING REQUIREMENTS.OPEN/CLOSED ELEMENT SEVERAL TIMES AGAINST 1"CSH TEST JOINT WITH SAME RESULTS.VOID STACK OF ALL FLUIDS AND PERFORMED INSPECTION ON ELEMENT FROM ABOVE.FILL STACK AND •RETEST WITH SAME RESULTS. -CONTINUE WITH TESTING SEQUENCE UNTIL ALL TESTING COMPLETE.WILL CHANGE ELEMENT AT END OF TESTING. 10/5/2014 00:00 - 03:00 3.00 BOPSUR N RREP OTHCMP RIG UP AND CHANGE OUT ANNULAR ELEMENT ON BOPE DUE TO INABILITY TO MEET PRESSURE TEST CRITERIA ON ANNULAR BAG WHEN CLOSING IN ON 1"CSH TEST JOINT SEVERAL TIMES. SEE TRACTION REPORT IR-4832780 FOR DETAILED REPORT. 03:00 - 05:00 2.00 BOPSUR P OTHCMP CONDUCT BOP TEST ON ANNULAR ELEMENT IN ACCORDANCE WITH AOGCC REGULATIONS,BP REQUIREMENTS,AND NORDIC PROCEDURES. -CONDUCT SHELL TEST ON ANNULAR, LUBRICATOR AS PER BP AND NORDIC REQUIREMENTS. TESTED ELEMENT ON 1" AND 2"TEST JOINTS,MET TEST CRITERIA WITH NO ISSUES. 05:00 - 06:00 1.00 CLEAN P OTHCMP RIG DOWN TESTING EQUIPMENT 06:00 - 07:00 1.00 CLEAN P OTHCMP CREW CHANGE OUT,CLEAR AND CLEAN RIG FLOOR,PREP FOR CLEANOUT RUN 07'00 - 08:00 1.00 CLEAN N SFAL OTHCMP PJSM ON CUTTING COIL TO CORRECT IRREGULAR COIL WRAPS ON REEL.PICK UP COIL CUTTER. CUT 300'OF COIL. RD COIL CUTTER,MAKE UP LUBRICATOR EXTENSTION TO INJECTOR. PREP COIL FOR INSTALLATION OF COIL CONNECTOR. INSTALL BOT COIL CONNECTOR. PULL TEST TO 35K. PRESSURE TEST CONNECTOR, GOOD. STAB ON,PRESSURE TEST LUBRICATOR CONNECTION AND HARD IRON BACK TO INNER REEL VALVES,ALL GOOD. -WELL IS SECURED WITH CLOSED AND TESTED SWAB AND SSV,MONITORING THROUGH WING VALVE.NIGHTCAP IS INSTALLED,PRESSURE TESTED. Printed 10/20/2014 10:12:23AM North America-ALASKA-BP Page 6 of 11 Operation Summary Report Common Well Name:G-01 AFE No Event Type:COM-ONSHORE(CON) Start Date: 10/3/2014 End Date: 10/8/2014 X3-015LD-C:(1,655,277.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A©70.67usft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth ' Phase Description of Operations (hr) (usft) 1-- 08:00 - 09:15 1.25 CLEAN P OTHCMP OPEN WELL UP TO CLOSED CHOKE AND TESTED IRON,NO PRESSURE. OPEN CHOKE,NO FLOW. PJSM ON RIGGING UP FOR MAKING UP CLEANOUT BHA. RIG UP TO MAKE UP 1.75"CLEANOUT BHA. 09:15 - 12:00 2.75 CLEAN P OTHCMP PJSM ON MAKING UP CLEANOUT BHA. MU 1,75"CLEANOUT MILL BHA ON STRAIGHT MOTOR AND CSH WORK STRING. MAKE UP UPPER WORKSTRING,STAB ON AND PRESSURE TEST QUICK TEST SUB. ALL GOOD. 12:00 - 13:15 1.25 CLEAN P OTHCMP RIH WITH CLEANOUT BHA. INCREASE FLOW RATE AT TOP OF DEPLOYMENT SLEEVE. -HAVING SOME LOSSES AS BHA IS APPROACHING LINER TOP;LOSS OF 4 BBLS FROM TRIP IN TO TOP OF LINER TOP. CONDUCT CHECK AND FLUID IS STATIC. BEGIN INSPECTING SURFACE EQUIPMENT, FIND LEAKAT CENTRIFUGE DUMP CHUTE. NORDIC COMING UP WITH PLAN TO REPAIR CHUTE. ISOLATE PIT THAT CHUTE IS DUMPING INTO SO THAT IT IS NOT IN ACTIVE SYSTEM. 13:15 - 16:00 2.75 CLEAN P OTHCMP ENTER INTO LINER,INITIAL CIRCULATION PRESSURE OF 2520 PSI AT.90 BPM. -FINAL CIRCULATING PRESSURE 2590 PSI AT .90 BPM. -TAG PBTD ON DEPTH AT 11,930' UNCORRECTED MD. NO MOTORWORK SEEN ON CLEANOUT RUN. PICK UP CLEAN,PUW 30K. MOVE BACK DOWN AND RECIPROCATE WHILE CIRCULATING CLEAN KCL DOWN HOLE. 16:00 - 18:30 2.50 CLEAN P OTHCMP POH WITH CLEAN KCL CHASING DIRTY FLUID OUT OF WELL AT.9 BPM,2140 PSI. FLOW CHECK ABOVE LINER TOP,ALL GOOD. CONTINUE TO POH WITH CLEANOUT BHA. FLOW CHECK AT SURFACE,ALL GOOD.POP OFF,STAND INJECTOR ON LEGS. 18:30 - 19:00 0.50 CLEAN P OTHCMP I ALLOW FOR CREW CHANGEOUT,PRE-TOUR WALKAROUNDS. 19:00 - 23:00 4.00 CLEAN P OTHCMP PJSM AND STAND BACK 1"CSH -RU TO STAND BACK LINER,RU ELEVATORS, STAGE FLOOR VALVES -LD 4 JTS 2-1/16"CSH -STAND BACK 84 JTS 1"CSH -LD MOTOR AND MILL 23:00 - 00:00 1.00 EVAL P OTHCMP PJSM AND PU LOGGING TOOLS -BAKER ATLAS REP AND WSL AGREE ON LOGGING SCHEDULE -PICK LOGGING TOOLS UP THE BEAVER SLIDE -RUN LOGGING TOOLS IN HOLE -RU BAKER ATLAS ENCODERS 10/6/2014 00:00 - 03:00 3.00 EVAL P OTHCMP PJSM AND RIH ON WORKSTRING -RUN 84 JTS 1"CSH FROM DERRICK -PU 4 JTS 2-1/16"CSH -PU INJECTOR AND GET ON WELL -PRESS TEST QTS TO 250/3500 PSI 03:00 - 04:30 1.50 EVAL P OTHCMP RIH WITH LOGGING BHA -90'/MIN WITH 0.53/0.86 BPM IN/OUT Printed 10/20/2014 10:12:23AM North America-ALASKA-BP Page 7 of 11 Operation Summary Report Common Well Name:G-01 AFE No Event Type:COM-ONSHORE(CON) Start Date:10/3/2014 End Date:10/8/2014 X3-015LD-C:(1,655,277.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A @70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:30 - 06:30 2.00 EVAL P OTHCMP LOG DOWN FROM 9000'MD TO PBTD -30'/MIN WITH 0.50/0.61 BPM -TAG PBTD AT 11,927'MD UNCORRECTED DEPTH 06:30 - 10:30 4.00 EVAL P OTHCMP CIRCULATE OFF BOTTOM WHILE GETTING PERFORATION PILL AROUND AND OUT OF THE BHA. BEGIN UP PASS AT 20 FPM. PAINT FLAG FOR PERF RUN ON TRIP OUT. CONTINUE LOGGING UP PER BAKER-ATLAS REP. -CONDUCT KICK WHILE TRIPPING DRILL 'WHEN TRIPPING OUT OF HOLE AFTER LOGGING. GOOD CREW RESPONSE. WHEN DRILLER FOLLOWED SHUT-IN ORDERS, SIMULATED FAILURE OF HCR SUPPLY LINE HOSE IN CELLAR WITH HCR IN THE OPEN POSITION. CREW RESPONSE WAS TO IMMEDIATELY THROUGH HCR MANUALLY INTO NEUTRAL AND CLOSE IN VALVE ON THE CHOKE MANIFOLD. CONDUCT AAR,DISCUSS WHY WE MOVE LEVER TO NEUTRAL AND WHICH VALVE TO CLOSE IN THE EVENT THAT THE HCR IS IN THE OPEN OR THE CLOSED 'POSITION WHEN THERE ISA HYDRAULIC FAILURE. -CONTINUE TO PULL TO SURFACE,FLOW CHECK BELOW BOP. ALL GOOD. PJSM ON LAYING DOWN BHA. 10:30 - 12:30 2.00 EVAL P OTHCMP POP OFF,LAY DOWN UPPER PORTION OF WORK STRING. STAND BACK 1"WORK STRING.RETRIEVE LOGGING TOOL CARRIER. 12:30 - 13:15 0.75 EVAL P OTHCMP CLEAR RIG FLOOR. RIG UP FOR PRESSURE TESTING LINER LAP. CONDUCT LINER LAP TEST TO CRITERIA IN WELL PLAN. LOW PRESSURE TEST GOOD. INITIATE HIGH PRESSURE TEST TO 2400 PSI. PRESSURE BUILD TO 1760 PSI OKAY,TAPER OFF,THEN BUILD AGAIN. CANNOT PRESSURE UP PAST 2050 PSI. PUMP 3 BBLS,SHUT DOWN PUMPS,IMMEDIATE SLOW BLEED OFF TO 1700 PSI. CALL OFF TEST. 13:15 - 14:00 0.75 PERFOB P OTHCMP MOBILIZE PERF GUNS ASSEMBLY AND TOOLS TO RIG. 14:00 - 14:45 0.75 PERFOB P OTHCMP CLEAR AND CLEAN RIG FLOOR,PREP TO RUN GUNS WHILE WAITING ON LOGGING DATA TO BE INTERPRETED. RECEIVE CONFIRMATION THAT PERFORATION INTERVALS WILL NOT CHANGE. INSPECT PAPERWORK AND QC REPORT ON E-FIRE HEAD. PJSM ON MAKING UP GUNS. EMPHASIZE SAFETY JOINT AND CROSSOVER TO BOTH PERFORATION GUNS AND TO 1" WORK STRING. 14:45 - 19:30 4.75 PERFOB P OTHCMP MAKE-UP PERFORATION ASSEMBLY PER SLB TCP REP AND PERFORATION MEMO. MAKE UP 1257.84'OF 1.56"OD 6 SPF GUN ASSEMBLY TO INCLUDE BOTTOM NOSE AND E-FIRE HEAD. PJSM AND CONTINUE TO MAKE UP ASSEMBLY TO WORK STRING OUT OF DERRICK. Printed 10/20/2014 10:12:23AM North America-ALASKA-BP Page 8 of 11 Operation Summary Report Common Well Name:G-01 AFE No Event Type:COM-ONSHORE(CON) Start Date:10/3/2014 End Date:10/8/2014 X3-015LD-C:(1,655,277.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A @70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 19:30 - 20:00 0.50 PERFOB P OTHCMP ALLOW FOR CREW CHANGE AND PRE-TOUR WALKAROUNDS 20:00 - 20:30 0.50 PERFOB P OTHCMP PJSM AND CONTINUE PU PERF ASSEMBLY -CONTINUE RUN 44 JTS 1"CSH FROM DERRICK 20:30 - 21:45 1.25 PERFOB N SFAL OTHCMP WHILE PU FIRST JOINT 2-1/16"CSH,NOTICE PLAY IN HI-LOAD DISCONNECT. SPACE OUT LAST JNT 1"CSH AND STAB SAFETY VALVE. CALL TO BOT THRU TUBING AND CALL OUT NEW DISCONNECT. WAIT ON NEW HI-LOAD DISCONNECT(3/4" BALL). 21:45 - 22:45 1.00 PERFOB P OTHCMP CONTINUE PU PERF'ASSEMBLY -RUN4JTS2-1/16"CSH -GET ON WELL,PRESS TEST QTS 22:45 - 00:00 1.25 PERFOB P OTHCMP RIH WITH PERFORATING ASSEMBLY -80'/MIN WITH 0.89/1.18 BPM IN/OUT -RIH TO 9000'MD 10/7/2014 00:00 - 01:00 1.00 PERFOB P OTHCMP CONTINUE RIH WITH PERFORATING ASSEMBLY I-80'/MIN WITH 0.89/1.18 BPM IN/OUT -SLOW TO 50'/MIN INSIDE LINER -SEE FLAG AT 11,747'MD(-15'CORRECTION) -CORRECT TO FLAG,RIH AND TAG PBTD AT 11,905'MD -PU TO FLAG AND CONFIRM DEPTH -RIH AND RE-TAG AT 11,905'MD 01:00 - 02:00 1.00 PERFOB N DPRB 11,905.00 OTHCMP CALL AND MAKE NOTIFICATIONS TO DAY WSL,ODE,AND SUPERINTENDENT.DECIDE TO POOH AND RECONFIGURE PERF GUN ASSEMBLY. 02:00 - 04:30 2.50 PERFOB N DPRB 11,905.00 OTHCMP POOH WITH PERF GUN ASSEMBLY 60'/MIN WITH 0.71/0.47 BPM IN/OUT I-FLOW CHECK ABOVE LINER,NO FLOW -INCREASE TO 90'/MIN ABOVE LINER -FLOW CHECK ON SURFACE,NO FLOW 04:30 - 09:30 5.00 PERFOB N DPRB 11,905.00 OTHCMP PJSM AND LD PERFORATING BHA -POP OFF,STAND INJECTOR ON LEGS -LD 4 JTS 2-1/16"CSH -STAND BACK 44 JTS 1"CSH _ -LD PERF GUNS TO LOWEST PERF INTERVAL 09:30 - 10:30 1.00 PERFOB N DPRB 11,905.00 OTHCMP 1 DISCUSS NEW INTERVAL AND GUN MAKE-UP. WALK THROUGH LAYOUT,FLAG GUNS TO BE OFFLOADED. PJSM ON MAKING UP AND HANDLING GUNS. REITERATE WELL CONTROL,MAKE-UP OF SAFETY JOINT. 10:30 - 14:30 4.00 PERFOB N DPRB 11,905.00 OTHCMP MAKE-UP 1.56"PERFORATION BHA PER GUN LAYOUT AND WELL PLAN BHA:GUNS WITH E-FIRE HEAD,DISCONNECT,1"WORK STRING,DISCONNECT,DUAL BACK PRESSURE VALVE,2-1/16"WORK JOINTS MADE UP TO COIL. 14:30 - 16:30 i 2.00 ' PERFOB N DPRB ' 11,905.00 OTHCMP 'RIH WITH RECONFIGURED PERF GUN BHA STOP AT EOP FLAG OF 8985.06' ADD 2717.03'FORA CORRECTED DEPTH OF 11702.09' 16:30 - 17:30 1.00 PERFOB P OTHCMP TAG PBTD ON DEPTH PU TO UP WT,UP WT=32.5K RE-TAG AGAIN Printed 10/20/2014 10:1223AM North America-ALASKA-BP Page g of 11 Operation Summary Report Common Well Name:G-01 AFE No Event Type:COM-ONSHORE(CON) Start Date:10/3/2014 End Date:10/8/2014 X3-015LD-C:(1,655,277.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01A©70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 20:00 2.50 PERFOB N HMAN OTHCMP CONFIRM WITH ODE WHERE PBTD IS. AGREEMENT MADE TO USE LOG PBTD OF 11,909.81'MD. MIX UP HI-VIS PILL AND PUMP DOWN COIL TO REPLACE PERF PILL CIRCULATED OUT OF HOLE. 20:00 - 21:00 1.00 PERFOB P OTHCMP HOOKUP TRUCK WITH FLUID FOR POSSIBLE LOSSES AFTER FIRING PERF GUNS.LINE UP CHOKE FOR HOLDING BACK PRESSURE. CHECK UP WEIGHT AT 31K AND DOWN WEIGHT AT 20K.VERIFY. TAG UP AT 11,901'MD SAME AS PREVIOUS TAGS. PULL TO UP WEIGHT AND SET DEPTH TO 11,909.81'MD. SET PUMP IDLE SPEED AT 0.4 BPM WITH 600 PSI. SET PUMP HIGH SPEED AT 1.2 BPM WITH 3760 PSI. PERFORM FIRING SEQUENCE PER SLB PROCEDURE. START TO PULL UP HOLE WITH 5 SECONDS TO FIRE. GUNS FIRE ON TIME AT 11,909'MD. THIS PUTS TOP OF BOTTOM PERF INTERVAL AT 11,829.63'MD. HOLE TOOK IMMEDIATE 2 BBL DRINK. PULL UP WHILE HOLDING BACK PRESSURE. 21:00 - 22:00 1.00 PERFOB P OTHCMP POOH AT 30 FOOT PER MINUTE. PUMP AT 1.32 BPM WITH 3840 PSI. OUT RATE AT 1.15 BPM,CALCULATED DISPLACEMENT AT 0.116 BPM. HOLDING 170 PSI BACK PRESSURE WITH CHOKE. LOSSES SAME AS BEFORE SHOOTING PERFORATIONS. DOES NOT APPEAR TO BE ENOUGH TO BULLHEAD FREEZE PROTECT. 22:00 22:15 0.25 PERFOB P OTHCMP SHUT DOWN PUMPS. FLOW CHECK WELL-NO FLOW. 22:15 - 23:15 1.00 PERFOB P OTHCMP PULL OUT OF HOLE AT 97 FPM WITH 28K UP WEIGHT. PUMP AT 1.2 BPM WITH 3340 PSI,OUT MM AT 0.81 BPM. LOSS RATE EFFECTIVELY AT ZERO. PULL TO BHA. LOST 2 BBLS TOTAL ON TRIP OUT. 23:15 - 23:30 0.25 PERFOB P OTHCMP FLOW CHECK WELL AT BHA-NO FLOW. HOLD PRE JOB SAFETY MEETING FOR LAYING DOWN BHA. 23:30 - 00:00 0.50 PERFOB P OTHCMP TAG UP.BREAK OFF QUICK TEST SUB. UN-STAB AND STAND BACK INJECTOR. PULL AND LAY DOWN BHA TO 1"CS HYDRIL. 10/8/2014 00:00 - 01:30 1.50 • PERFOB P OTHCMP PICK UP,RUN IN HOLE WITH 1"HYDRIL FROM DERRICK. 01:30 - 02:15 0.75 PERFOB P OTHCMP CIRCULATE FRESH WATER THROUGH 1"CS HYDRIL SURFACE TO SURFACE TO FLUSH OUT HYDRIL PIPE. PUMP AT 1.04 BPM WITH 4100 PSI. PUMP 30 BBLS TO DISPLACE KCL WATER. Printed 10/20/2014 10:12:23AM North America-ALASKA-BP Page 10 of 11 Operation Summary Report Common Well Name:G-01 AFE No Event Type:COM-ONSHORE(CON) Start Date: 10/3/2014 End Date:10/8/2014 X3-015LD-C:(1,655,277.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor:NORDIC CALISTA UWI:500292021400 Active datum:RKB G-01 A©70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:15 - 04:45 2.50 PERFOB P OTHCMP POOH WITH 1"CS HYDRIL,STAND BACK IN DERRICK. PULL TO MARKER JOINT. SUBMITTED NOTIFICATION FOR G-15C INITIAL BOP TEST AT 03:00 HOURS FOR 10/9/2014 AT 03:00 HOURS. 04:45 - 05:00 0.25 PERFOB P OTHCMP 'HOLD PJSM FOR HANDLING PERFORATING GUNS. PULL LAST 5 STANDS OF CS HYDRIL. 05:00 - 05:30 0.50 PERFOB P OTHCMP RIG DOWN CS HYDRIL HANDLING TOOLS. RIG UP TO BREAK OUT AND LAY DOWN GUNS. 05:30 - 06:30 1.00 PERFOB P OTHCMP LAY DOWN PERORATION GUNS. 06:30 - 06:45 0.25 PERFOB P OTHCMP PJSM TO CONTINUE LD SPENT GUNS 06:45 - 08:40 1.92 PERFOB P OTHCMP LD SAFETY JOINT AND CONTINUE TO LD SPENT GUNS 08:40 - 10:00 1.33 PERFOB P OTHCMP PERF GUNS OOH,LOAD OUT PERF GUNS AND EQUIPMENT ;10:00 - 10:15 0.25 RIGD P • POST RD ELEVATORS AND MU INJECTOR SHACKLE &SLING TO THE BLOCKS 10:15 - 10:30 0.25 RIGD P POST .HOLD PJSM TO PU THE INJECTOR TO FP THE WELL 10:30 - 11:00 0.50 RIGD . P POST PU THE INJECTOR AND MU A NOZZLE BHA WITH DFCV'S 11:00 - 11:20 0.33 RIGD P POST RIH TO FREEZE PROTECT THE WELL FROM 2500'TO SURFACE WITH 60/40 METHANOL f WATER 11:20 - 11:45 0.42 RIGD P POST I PUMP 2 BBLS OF 60/40 OUT THEN POOH DISPLACING WELL 11:45 - 11:55 0.17 RIGD P POST FLOW CHECK WELL 11:55 - 12:20 0.42 RIGD P POST GOOD NO FLOW,TAG UP,REMOVE THE INJECTOR AND NOZZLE BHA SERVICE TREE VALVES 12:20 - 12:55 • 0.58 RIGD P POST SET TWC TWC SET,CLOSE MASTER&SWAB VALVES TO PERFORM LTT 12:55 - 13:40 0.75 RIGD P POST GOOD LTT,STAB INJECTOR ON THE STACK AND BLOW BACK WITH AIR 13:40 - 14:00 0.33 RIGD P POST COIL BLOWN BACK,HOLD PJSM TO SUCK OUT THE STACK,LOTO THE KOOMEY,OPEN THE BOP DOORS AND SWAP OUT AND INSPECT RAMS 14:00 - 18:30 4.50 RIGD P POST SUCK OUT THE STACK,LOTO THE KOOMEY, OPEN THE BOP DOORS,SWAP OUT AND INSPECT RAMS _ 18:30 - 20:30 2.00 RIGD P POST NIPPLE DOWN BOP AND ASSOCIATED EQUIPMENT. LOCKED OUT WELLS G-16 AND G-19 FOR RIG MOVE OVER NEXT WELL,G-15. LOU GRIMALDI WITH AOGCC WAIVED WITNESS OF INITIAL BOP TEST ON WELL G-15C AT 19:39 HOURS. Printed 10/20/2014 10:12:23AM North America-ALASKA-BP Page 11 of 11 Operation Summary Report Common Well Name G-01 AFE No Event Type:COM-ONSHORE(CON) Start Date:10/3/2014 End Date: 10/8/2014 ,X3-015LD-C:(1,655,277.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/me:5/21/1976 12:00:00AM Rig Release:10/8/2014 Rig Contractor.NORDIC CALISTA I UWI:500292021400 Active datum:RKB G-01A @70.67usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 21:00 0.50 RIGD P POST INSTALL TREE CAP. TEST CAP AND TREE TO 250 PSI LOW,3500 PSI HIGH FOR 5 CHARTED MINUTES EACH- PASS. RIG RELEASED AT 21:00 HOURS. Printed 10/20/2014 10:12:23AM G-01 B, Well History (Post-Rig Sidetrack) Date Summary 10/09/14 T/I/O=TWC/0/0. Removed Nordic test spool#4. Install tree cap. Torque all flanges to API SPECS. Shell tested tree to 300 low, 5000 high for 5 min each (PASSED). Pulled 4"TWC#260 at 115". RDMO. Final T/I/O=Vac/0/0. 10/10/14 T/I/0=Vac/0/0/0. Installed temp valve#20. Final WHP's Vac/0/0. 10/11/14 TAGGED DEP SLV @ 9,432'SLM/9,450' MD. DRIFTED W/2.74" D. WHIPSTOCK&2.25" STINGER TO 9,420' SLM. 10/12/14 DRIFTED W/1.75" CENT TO 9,550'SLM. RAN PDS 24 ARM CALIPER PER PROGRAM (Good data). RAN 14'x 2-1/2" PUMP BAILER TO DEPLOY SLV @ 9,432' SLM (recovered cement). BRUSH DEPLOYMENT SLV @ 9,432'SLM/9,450'MD W/3-1/2" BRUSH, 2.72"CENT, 2-7/8" BRUSH (No issues, chunk of cement on brush). MADE TWO RUNS W/ 10'x 2.74" DMY WHIP STOCK, 2.24" DMY STINGER TO DEPLOY SLV 9,432'SLM (see log for details). SET 2-3/8"35 KB LTP @ 9,437' SLM. 10/12/14 T/I/O=91/13/11 Temp.= S/I Assist Slickline(post CTD) Pumped 4 bbls crude down TBG to assist Slickline. 10/13/14 RAN PDS 24 ARM CALIPER THROUGH BKR 35KB LTP @ 9,437' SLM/9,450' MD (Good data). SET 3-1/2" SLIP STOP C-SUB @ 4,471' SLM (No issues). PULLED ST#2 RK-DGLV @ 4,358' SLM/ 4,377' MD. (see log). SET ST#2 RK-LGLV(1/4" ports, 1,500#tro) ©4,358' SLM/4,377' MD. PULLED 3-1/2" SLIP STOP C-SUB FROM 4,471' SLM (No issues). Page 1 of 1 0 by North America - ALASKA - BP Prudhoe Bay PB G Pad G-01 500292021400 G-01 B Design: G-01 B Survey Report - Geographic 07 October, 2014 vpI BAKER HUGHES abp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-01 Project: Prudhoe Bay TVD Reference: RKB G-01A @ 70.67usft Site: PB G Pad MD Reference: RKB G-01A @ 70.67usft Well: G-01 North Reference: True Wellbore: G-01 B Survey Calculation Method: Minimum Curvature Design: G-01 B Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB G Pad,TR-11-13 Site Position: Northing: 5,966,832.87 usft Latitude: 70°18'58.211 N From: Map Easting: 656,301.39 usft Longitude: 148°43'59.01 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.19 ° Well G-01 API No. 500292021400 Well Position +N/-S 0.00 usft Northing: 5,969,586.00 usft Latitude: 70°19'24.885 N +EI-W 0.00 usft Easting: 658,241.00 usft Longitude: 148°43'0.74 W Position Uncertainty 0.00 usft Wellhead Elevation: 34.97 usft Ground Level: 33.25 usft Wellbore G-01B API no. 500292021402 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (0) (°) (nT) BGGM2014 9/29/2014 19.63 81.02 57,602 Design G-01 B Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 9,497.81 Vertical Section: Depth From(TVD) +NI-S +E/-W Direction (usft) (usft) (usft) (°) 35.67 0.00 0.00 36.66 Survey Program Date: 10/3/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 108.84 8,106.02 1 :Camera based gyro multisho(G-01) CB-GYRO-MS Camera based gyro multishot 8,170.00 9,497.81 2:MWD-Standard(G-01A) MWD MWD-Standard 9,501.50 9,593.31 INC+TREND(G-01BPB1) INC+TREND Inclinometer+known azi trend 9,622.96 9,742.59 MWD(G-01 BPB1) MWD MWD-Standard 9,774.00 9,800.28 INC+TREND(G-01BPB2) INC+TREND Inclinometer+known azi trend 9,830.19 9,860.79 MWD(G-01 BPB2) MWD MWD-Standard 9,878.00 9,908.97 INC+TREND(G-01B) INC+TREND Inclinometer+known azi trend 9,936.97 11,910.28 MWD(G-01B) MWD MWD-Standard 10/7/2014 1:05:48PM Page 2 COMPASS 5000.1 Build 61 red- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-01 Project: Prudhoe Bay TVD Reference: RKB G-01A @ 70.67usft Site: PB G Pad MD Reference: RKB G-01A @ 70.67usft Well: G-01 North Reference: True Wellbore: G-01 B Survey Calculation Method: Minimum Curvature Design: G-018 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,497.81 39.73 56.70 8,664.38 2,940.04 -80.17 5,972,523.48 658,098.87 70°19'53.800 N 148°43'3.08 W G-01BPB1 TIP 9,501.50 39.88 56.71 8,667.22 2,941.33 -78.19 5,972,524.82 658,100.82 70°19'53.812 N 148°43'3.02 W G-01BPB1 KOP 9,532.57 33.51 61.44 8,692.12 2,950.91 -62.31 5,972,534.73 658,116.49 70°19'53.906 N 148°43'2.56 W Interpolated Azimuth 9,562.61 29.61 66.61 8,717.72 2,957.83 -48.21 5,972,541.94 658,130.44 70°19'53.975 N 148°43'2.14 W Interpolated Azimuth 9,593.31 29.85 72.58 8,744.38 2,963.13 -33.96 5,972,547.54 658,144.58 70°19'54.027 N 148°43'1.73 W Interpolated Azimuth 9,622.96 30.31 79.06 8,770.05 2,966.76 -19.57 5,972,551.47 658,158.89 70°19'54.062 N 148°43'1.31 W 9,654.16 30.01 86.22 8,797.03 2,968.77 -4.05 5,972,553.81 658,174.36 70°19'54.082 N 148°43'0.86 W 9,682.20 28.77 88.87 8,821.46 2,969.36 9.70 5,972,554.70 658,188.09 70°19'54.088 N 148°43'0.45 W 9,712.68 28.28 81.86 8,848.25 2,970.53 24.18 5,972,556.17 658,202.55 70°19'54.099 N 148°43'0.03 W 9,742.59 28.98 74.52 8,874.51 2,973.47 38.19 5,972,559.40 658,216.48 70°19'54.128 N 148°42'59.62 W 9,772.27 30.54 81.23 8,900.28 2,976.54 52.57 5,972,562.77 658,230.80 70°19'54.159 N 148°42'59.20 W G-01 BPB2 TIP 9,774.00 30.64 81.60 8,901.77 2,976.67 53.44 5,972,562.92 658,231.67 70°19'54.160 N 148°42'59.18 W G-01BPB2 KOP 9,800.28 37.27 81.70 8,923.56 2,978.80 67.96 5,972,565.36 658,246.13 70°19'54.181 N 148°42'58.75 W Interpolated Azimuth 9,830.19 44.79 82.19 8,946.11 2,981.54 87.39 5,972,568.51 658,265.50 70°19'54.208 N 148°42'58.19 W 9,860.79 52.11 86.70 8,966.39 2,983.71 110.16 5,972,571.15 658,288.22 70°19'54.229 N 148°42'57.52 W G-01B TIP 9,878.00 55.15 90.38 8,976.60 2,984.05 124.00 5,972,571.79 658,302.05 70°19'54.232 N 148°42'57.12 W G-01 B KOP 9,908.97 64.72 90.38 8,992.10 2,983.87 150.78 5,972,572.17 658,328.82 70°19'54.231 N 148°42'56.33 W Interpolated Azimuth 9,936.97 71.51 89.36 9,002.53 2,983.94 176.74 5,972,572.79 658,354.78 70°19'54.231 N 148°42'55.58 W 9,967.57 81.40 85.98 9,009.69 2,985.16 206.42 5,972,574.64 658,384.43 70°19'54.243 N 148°42'54.71 W 10,000.36 93.13 81.73 9,011.25 2,988.67 238.92 5,972,578.83 658,416.84 70°19'54.278 N 148°42'53.76 W 10,030.33 92.85 84.49 9,009.69 2,992.26 268.63 5,972,583.04 658,446.47 70°19'54.313 N 148°42'52.89 W 10,060.24 90.31 88.13 9,008.86 2,994.18 298.46 5,972,585.59 658,476.25 70°19'54.332 N 148°42'52.02 W 10,090.30 90.64 92.35 9,008.61 2,994.06 328.51 5,972,586.10 658,506.29 70°19'54.331 N 148°42'51.15 W 10,120.49 91.60 96.79 9,008.02 2,991.65 358.59 5,972,584.33 658,536.42 70°19'54.307 N 148°42'50.27 W 10,150.31 90.18 101.47 9,007.56 2,986.92 388.02 5,972,580.22 658,565.94 70°19'54.261 N 148°42'49.41 W 10,180.17 87.76 105.36 9,008.10 2,980.00 417.06 5,972,573.91 658,595.11 70°19'54.192 N 148°42'48.56 W 10,210.37 84.65 102.47 9,010.10 2,972.75 446.30 5,972,567.29 658,624.49 70°19'54.121 N 148°42'47.71 W 10,245.23 86.81 99.90 9,012.69 2,966.01 480.40 5,972,561.27 658,658.72 70°19'54.055 N 148°42'46.71 W 10,275.30 89.72 95.62 9,013.60 2,961.95 510.17 5,972,557.84 658,688.57 70°19'54.015 N 148°42'45.84 W 10,305.39 92.03 92.87 9,013.14 2,959.73 540.17 5,972,556.25 658,718.61 70°19'53.993 N 148°42'44.97 W 10,335.43 91.63 88.60 9,012.18 2,959.34 570.18 5,972,556.49 658,748.62 70°19'53.989 N 148°42'44.09 W 10,365.62 94.67 86.24 9,010.52 2,960.70 600.29 5,972,558.48 658,778.69 70°19'54.002 N 148°42'43.21 W 10,395.34 95.16 82.74 9,007.98 2,963.54 629.76 5,972,561.95 658,808.09 70°19'54.030 N 148°42'42.35 W 10,425.41 92.95 80.07 9,005.85 2,968.02 659.41 5,972,567.05 658,837.64 70°19'54.074 N 148°42'41.48 W 10,460.53 90.00 76.89 9,004.95 2,975.03 693.81 5,972,574.79 658,871.88 70°19'54.143 N 148°42'40.48 W 10,490.51 90.43 78.97 9,004.83 2,981.30 723.12 5,972,581.67 658,901.05 70°19'54.205 N 148°42'39.62 W 10,520.37 89.05 82.61 9,004.97 2,986.08 752.59 5,972,587.07 658,930.41 70°19'54.252 N 148°42'38.76 W 10,550.33 86.59 86.11 9,006.11 2,989.02 782.38 5,972,590.64 658,960.13 70°19'54.281 N 148°42'37.89 W 10,580.35 83.63 89.29 9,008.67 2,990.22 812.26 5,972,592.47 658,989.97 70°19'54.293 N 148°42'37.02 W 10,610.17 87.79 91.60 9,010.90 2,989.99 841.98 5,972,592.87 659,019.70 70°19'54.290 N 148°42'36.15 W 10,640.31 89.85 94.63 9,011.52 2,988.35 872.07 5,972,591.86 659,049.81 70°19'54.274 N 148°42'35.27 W 10,670.33 91.29 104.79 9,011.22 2,983.30 901.62 5,972,587.43 659,079.45 70°19'54.224 N 148°42'34.41 W 10,700.51 89.94 109.13 9,010.90 2,974.50 930.47 5,972,579.24 659,108.49 70°19'54.138 N 148°42'33.57 W 10/7/2014 1:05:48PM Page 3 COMPASS 5000.1 Build 61 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-01 Project: Prudhoe Bay TVD Reference: RKB G-01A @ 70.67usft Site: PB G Pad MD Reference: RKB G-01A @ 70.67usft Well: G-01 North Reference: True Wellbore: G-01 B Survey Calculation Method: Minimum Curvature Design: G-01 B Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 10,732.01 87.85 113.43 9,011.50 2,963.07 959.81 5,972,568.44 659,138.06 70°19'54.025 N 148°42'32.71 W 10,760.17 87.36 117.68 9,012.68 2,950.94 985.19 5,972,556.84 659,163.69 70°19'53.906 N 148°42'31.97 W 10,790.45 89.02 122.09 9,013.64 2,935.86 1,011.42 5,972,542.32 659,190.23 70°19'53.758 N 148°42'31.21 W 10,820.50 90.83 122.19 9,013.68 2,919.88 1,036.87 5,972,526.88 659,216.00 70°19'53.601 N 148°42'30.46 W 10,850.45 89.69 119.22 9,013.54 2,904.58 1,062.61 5,972,512.14 659,242.06 70°19'53.450 N 148°42'29.71 W 10,880.59 90.37 116.16 9,013.53 2,890.58 1,089.30 5,972,498.70 659,269.04 70°19'53.312 N 148°42'28.93 W 10,910.51 91.07 111.94 9,013.15 2,878.39 1,116.61 5,972,487.09 659,296.60 70°19'53.192 N 148°42'28.13 W 10,941.79 90.98 109.05 9,012.59 2,867.44 1,145.91 5,972,476.76 659,326.11 70°19'53.085 N 148°42'27.28 W 10,970.27 89.63 105.09 9,012.44 2,859.08 1,173.12 5,972,468.98 659,353.50 70°19'53.002 N 148°42'26.48 W' 11,000.85 86.07 103.79 9,013.59 2,851.46 1,202.71 5,972,461.99 659,383.24 70°19'52.927 N 148°42'25.62 W 11,030.37 86.28 100.74 9,015.56 2,845.21 1,231.49 5,972,456.34 659,412.14 70°19'52.866 N 148°42'24.78 W 11,060.41 85.97 98.55 9,017.59 2,840.19 1,261.04 5,972,451.94 659,441.79 70°19'52.816 N 148°42'23.92 W 11,090.29 86.28 95.82 9,019.61 2,836.46 1,290.61 5,972,448.84 659,471.43 70°19'52.780 N 148°42'23.05 W 11,120.53 85.33 93.38 9,021.82 2,834.04 1,320.67 5,972,447.05 659,501.53 70°19'52.756 N 148°42'22.18 W 11,150.41 85.79 90.36 9,024.13 2,833.07 1,350.44 5,972,446.71 659,531.31 70°19'52.746 N 148°42'21.31 W 11,180.45 88.83 88.37 9,025.54 2,833.40 1,380.44 5,972,447.68 659,561.30 70°19'52.750 N 148°42'20.43 W 11,210.58 89.97 87.85 9,025.86 2,834.40 1,410.55 5,972,449.30 659,591.38 70°19'52.759 N 148°42'19.55 W 11,240.41 90.83 84.87 9,025.65 2,836.29 1,440.32 5,972,451.82 659,621.10 70°19'52.778 N 148°42'18.68 W 11,260.69 90.52 82.64 9,025.41 2,838.49 1,460.48 5,972,454.45 659,641.20 70°19'52.799 N 148°42'18.09 W 11,290.52 90.55 78.93 9,025.13 2,843.27 1,489.91 5,972,459.85 659,670.53 70°19'52.846 N 148°42'17.24 W 11,320.43 91.90 77.73 9,024.49 2,849.32 1,519.20 5,972,466.51 659,699.68 70°19'52.906 N 148°42'16.38 W 11,350.24 95.51 74.28 9,022.56 2,856.51 1,548.05 5,972,474.31 659,728.37 70°19'52.976 N 148°42'15.54 W 11,380.77 94.37 70.66 9,019.94 2,865.67 1,577.05 5,972,484.08 659,757.17 70°19'53.066 N 148°42'14.69 W 11,410.82 90.49 72.76 9,018.66 2,875.09 1,605.55 5,972,494.10 659,785.46 70°19'53.159 N 148°42'13.86 W 11,440.71 90.06 77.32 9,018.52 2,882.80 1,634.42 5,972,502.42 659,814.16 70°19'53.235 N 148°42'13.02 W 11,470.67 92.64 79.95 9,017.81 2,888.70 1,663.78 5,972,508.94 659,843.39 70°19'53.293 N 148°42'12.16 W 11,500.52 89.17 80.97 9,017.34 2,893.65 1,693.21 5,972,514.50 659,872.70 70°19'53.341 N 148°42'11.30 W 11,530.79 90.89 80.63 9,017.32 2,898.49 1,723.09 5,972,519.97 659,902.47 70°19'53.389 N 148°42'10.43 W 11,560.92 90.46 78.23 9,016.97 2,904.01 1,752.70 5,972,526.12 659,931.96 70°19'53.443 N 148°42'9.56 W 11,590.41 93.87 77.43 9,015.86 2,910.23 1,781.50 5,972,532.93 659,960.62 70°19'53.504 N 148°42'8.72 W 11,620.40 95.78 78.24 9,013.33 2,916.52 1,810.72 5,972,539.84 659,989.69 70°19'53.566 N 148°42'7.87 W', ' 11,650.67 94.05 82.57 9,010.74 2,921.55 1,840.44 5,972,545.49 660,019.31 70°19'53.615 N 148°42'7.00 W 11,680.46 91.38 85.77 9,009.33 2,924.57 1,870.04 5,972,549.14 660,048.83 70°19'53.645 N 148°42'6.14 W 11,710.73 89.14 89.16 9,009.19 2,925.91 1,900.27 5,972,551.11 660,079.03 70°19'53.658 N 148°42'5.25 W 11,740.44 89.66 93.04 9,009.50 2,925.34 1,929.97 5,972,551.17 660,108.73 70°19'53.653 N 148°42'4.39 W 11,770.43 88.43 96.70 9,010.00 2,922.79 1,959.84 5,972,549.26 660,138.65 70°19'53.627 N 148°42'3.51 W 11,800.51 88.74 101.13 9,010.74 2,918.13 1,989.54 5,972,545.22 660,168.43 70°19'53.582 N 148°42'2.65 W 11,830.48 87.70 105.61 9,011.68 2,911.21 2,018.68 5,972,538.92 660,197.71 70°19'53.513 N 148°42'1.80 W 11,858.95 87.85 109.79 9,012.78 2,902.56 2,045.78 5,972,530.84 660,224.98 70°19'53.428 N 148°42'1.00 W 11,888.23 89.33 113.76 9,013.50 2,891.70 2,072.95 5,972,520.56 660,252.38 70°19'53.321 N 148°42'0.21 W 11,910.28 91.10 117.46 9,013.42 2,882.18 2,092.83 5,972,511.46 660,272.45 70°19'53.228 N 148°41'59.63 W 11,953.00 91.10 117.46 9,012.60 2,862.48 2,130.73 5,972,492.56 660,310.75 70°19'53.034 N 148°41'58.52 W Projection to TD 10/7/2014 1:05:48PM Page 4 COMPASS 5000.1 Build 61 bp North America - ALASKA - BP Prudhoe Bay PB G Pad G-01 500292021400 G-01 BPB1 Design: G-01 BPB1 Survey Report - Geographic 07 October, 2014 r' I BAKER HUGHES • MP- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-01 Project: Prudhoe Bay TVD Reference: RKB G-01A @ 70.67usft Site: PB G Pad MD Reference: RKB G-01A @ 70.67usft Well: G-01 North Reference: True Wellbore: G-O1BPB1 Survey Calculation Method: Minimum Curvature Design: G-01BPB1 Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB G Pad,TR-11-13 Site Position: Northing: 5,966,832.87 usft Latitude: 70°18'58.211 N From: Map Easting: 656,301.39 usft Longitude: 148°43'59.01 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.19 ° Well G-01 API No. 500292021400 Well Position +N/-S 0.00 usft Northing: 5,969,586.00 usft Latitude: 70°19'24.885 N +E/-W 0.00 usft Easting: 658,241.00 usft Longitude: 148°43'0.74 W Position Uncertainty 0.00 usft Wellhead Elevation: 34.97 usft Ground Level: 33.25 usft Wellbore G-01BPB1 API no. 500292021470 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (0) (0) (nT) BGGM2014 9/19/2014 19.65 81.02 57,603 Design G-01BPB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,497.81 Vertical Section: Depth From(ND) +N/-S +EI-W Direction (usft) (usft) (usft) (0) 35.67 0.00 0.00 2.82 Survey Program Date: 10/1/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 108.84 8,106.02 1 :Camera based gyro multisho(G-01) CB-GYRO-MS Camera based gyro multishot 8,170.00 9,497.81 2:MWD-Standard(G-01A) MWD MWD-Standard 9,501.50 9,593.31 INC+TREND(G-01BPB1) INC+TREND Inclinometer+known azi trend 9,622.96 9,981.83 MWD(G-01 BPB1) MWD MWD-Standard 10/7/2014 10:50:54AM Page 2 COMPASS 5000.1 Build 61 I'" 0 bp Survey Report-Geographic BAKERHUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-01 Project: Prudhoe Bay TVD Reference: RKB G-01A @ 70.67usft Site: PB G Pad MD Reference: RKB G-01A @ 70.67usft Well: G-01 North Reference: True Wellbore: G-01 BPB1 Survey Calculation Method: Minimum Curvature Design: G-01BPB1 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,497.81 39.73 56.70 8,664.38 2,940.04 -80.17 5,972,523.48 658,098.87 70°19'53.800 N 148°43'3.08 W G-01BPB1 TIP 9,501.50 39.88 56.71 8,667.22 2,941.33 -78.19 5,972,524.82 658,100.82 70°19'53.812 N 148°43'3.02 W G-01BPB1 KOP 9,532.57 33.51 61.44 8,692.12 2,950.91 -62.31 5,972,534.73 658,116.49 70°19'53.906 N 148°43'2.56 W Interpolated Azimuth 9,562.61 29.61 66.61 8,717.72 2,957.83 -48.21 5,972,541.94 658,130.44 70°19'53.975 N 148°43'2.14 W Interpolated Azimuth 9,593.31 29.85 72.58 8,744.38 2,963.13 -33.96 5,972,547.54 658,144.58 70°19'54.027 N 148°43'1.73 W Interpolated Azimuth 9,622.96 30.31 79.06 8,770.05 2,966.76 -19.57 5,972,551.47 658,158.89 70°19'54.062 N 148°43'1.31 W 9,654.16 30.01 86.22 8,797.03 2,968.77 -4.05 5,972,553.81 658,174.36 70°19'54.082 N 148°43'0.86 W 9,682.20 28.77 88.87 8,821.46 2,969.36 9.70 5,972,554.70 658,188.09 • 70°19'54.088 N 148°43'0.45 W 9,712.68 28.28 81.86 8,848.25 2,970.53 24.18 5,972,556.17 658,202.55 70°19'54.099 N 148°43'0.03 W 9,742.59 28.98 74.52 8,874.51 2,973.47 38.19 5,972,559.40 658,216.48 70°19'54.128 N 148°42'59.62 W 9,772.27 30.50 81.25 8,900.29 2,976.53 52.56 5,972,562.77 658,230.79 70°19'54.158 N 148°42'59.20 W 9,802.19 32.97 86.84 8,925.74 2,978.14 68.20 5,972,564.70 658,246.39 70°19'54.174 N 148°42'58.75 W 9,832.43 31.04 86.99 8,951.38 2,979.00 84.21 5,972,565.90 658,262.37 70°19'54.183 N 148°42'58.28 W 9,862.58 26.12 87.61 8,977.85 2,979.69 98.61 5,972,566.89 658,276.76 70°19'54.189 N 148°42'57.86 W 9,892.17 22.92 90.06 9,004.77 2,979.95 110.88 5,972,567.42 658,289.02 70°19'54.192 N 148°42'57.50 W 9,923.03 19.32 94.49 9,033.55 2,979.55 121.98 5,972,567.24 658,300.13 70°19'54.188 N 148°42'57.18 W • 9,953.47 15.62 100.05 9,062.59 2,978.44 131.04 5,972,566.32 658,309.21 70°19'54.177 N 148°42'56.91 W 9,981.83 12.23 108.52 9,090.11 2,976.82 137.65 5,972,564.84 658,315.85 70°19'54.161 N 148°42'56.72 W 10,025.00 12.23 108.52 9,132.30 2,973.91 146.32 5,972,562.12 658,324.58 70°19'54.133 N 148°42'56.46 W Projection to TD 10/7/2014 10:50::54AM Page 3 COMPASS 5000.1 Build 61 by North America - ALASKA - BP Prudhoe Bay PB G Pad G-01 500292021400 G-01 BPB2 Design: G-01 BPB2 Survey Report - Geographic 07 October, 2014 BAKER HUGHES IFa' 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-01 Project Prudhoe Bay TVD Reference: RKB G-01A @ 70.67usft Site: PB G Pad MD Reference: RKB G-01A @ 70.67usft Well: G-01 North Reference: True Wellbore: G-01 BPB2 Survey Calculation Method: Minimum Curvature Design: G-01 BPB2 Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB G Pad,TR-11-13 Site Position: Northing: 5,966,832.87 usft Latitude: 70°18'58.211 N From: Map Easting: 656,301.39 usft Longitude: 148°43'59.01 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.19 ° Well G-01 API No. 500292021400 Well Position +NI-S 0.00 usft Northing: 5,969,586.00 usft Latitude: 70°19'24.885 N +E/-W 0.00 usft Easting: 658,241.00 usft Longitude: 148°43'0.74 W Position Uncertainty 0.00 usft Wellhead Elevation: 34.97 usft Ground Level: 33.25 usft Wellbore G-01BPB2 API no. 500292021471 Magnetics Model Name Sample Date Declination Dip Angle Field Strength O (°) (nT) BGGM2014 9/29/2014 19.63 81.02 57,602 Design G-01BPB2 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 9,497.81 Vertical Section: Depth From(TVD) +NI-S +EI-W Direction (usft) (usft) (usft) (°) 35.67 0.00 0.00 12.59 Survey Program Date: 10/7/2014 j From To (usft) (usft) Survey(Wellbore) Tool Name Description 106.02 8,103.20 1 :Camera based gyro multisho(G-01) CB-GYRO-MS Camera based gyro multishot 8,167.18 9,494.99 2:MWD-Standard(G-01A) MWD MWD-Standard 9,497.81 9,590.49 INC+TREND(G-01BPB1) INC+TREND Inclinometer+known azi trend 9,620.14 9,772.27 MWD(G-01 BPB1) MWD MWD-Standard 9,774.00 9,800.28 INC+TREND(G-01BPB2) INC+TREND Inclinometer+known azi trend 9,830.19 10,410.21 MWD(G-01 BPB2) MWD MWD-Standard 10/7/2014 12:52:03PM Page 2 COMPASS 5000.1 Build 61 0 bp Survey Report-Geographic ri BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-01 Project Prudhoe Bay TVD Reference: RKB G-01A @ 70.67usft Site: PB G Pad MD Reference: RKB G-01A @ 70.67usft Well: G-01 North Reference: True Wellbore: G-01 BPB2 Survey Calculation Method: Minimum Curvature Design: G-01 BPB2 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +EI-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,497.81 39.73 56.70 8,664.38 2,940.04 -80.17 5,972,523.48 658,098.87 70°19'53.800 N 148°43'3.08 W G-01BPB1 TIP 9,501.50 39.88 56.71 8,667.22 2,941.33 -78.19 5,972,524.82 658,100.82 70°19'53.812 N 148°43'3.02 W G-01BPB1 KOP 9,532.57 33.51 61.44 8,692.12 2,950.91 -62.31 5,972,534.73 658,116.49 70°19'53.906 N 148°43'2.56 W Interpolated Azimuth 9,562.61 29.61 66.61 8,717.72 2,957.83 -48.21 5,972,541.94 658,130.44 70°19'53.975 N 148°43'2.14 W Interpolated Azimuth 9,622.96 30.31 79.06 8,770.05 2,966.65 -19.55 5,972,551.36 658,158.91 70°19'54.061 N 148°43'1.31 W 9,654.16 30.01 86.22 8,797.04 2,968.66 -4.03 5,972,553.70 658,174.39 70°19'54.081 N 148°43'0.85 W 9,682.20 28.77 88.87 8,821.47 2,969.25 9.72 5,972,554.58 658,188.11 70°19'54.087 N 148°43'0.45 W 9,712.68 28.28 81.86 8,848.26 2,970.42 24.20 5,972,556.06 658,202.57 70°19'54.098 N 148°43'0.03 W 9,742.59 28.98 74.52 8,874.52 2,973.36 38.21 5,972,559.29 658,216.51 70°19'54.127 N 148°42'59.62 W 9,772.27 30.50 81.25 8,900.30 2,976.42 52.58 5,972,562.66 658,230.82 70°19'54.157 N 148°42'59.20 W G-01BPB2 TIP 9,774.00 30.64 81.60 8,901.79 2,976.55 53.45 5,972,562.81 658,231.68 70°19'54.159 N 148°42'59.18 W G-01BPB2 KOP 9,800.28 37.27 81.70 8,923.57 2,978.68 67.97 5,972,565.24 658,246.15 70°19'54.180 N 148°42'58.75 W Interpolated Azimuth 9,830.19 44.79 82.19 8,946.12 2,981.43 87.40 5,972,568.39 658,265.51 70°19'54.207 N 148°42'58.19 W 9,860.79 52.11 86.70 8,966.41 2,983.59 110.17 5,972,571.04 658,288.23 70°19'54.228 N 148°42'57.52 W 9,890.40 57.41 92.87 8,983.50 2,983.64 134.32 5,972,571.59 658,312.38 70°19'54.228 N 148°42'56.82 W 9,920.37 63.42 98.47 8,998.30 2,981.03 160.23 5,972,569.53 658,338.33 70°19'54.203 N 148°42'56.06 W 9,950.40 68.79 103.77 9,010.46 2,975.71 187.14 5,972,564.78 658,365.35 70°19'54.150 N 148°42'55.27 W 9,983.63 75.11 111.25 9,020.77 2,966.18 217.22 5,972,555.89 658,395.62 70°19'54.057 N 148°42'54.39 W 10,010.29 78.59 118.87 9,026.84 2,955.19 240.71 5,972,545.39 658,419.33 70°19'53.948 N 148°42'53.71 W 10,030.54 80.59 124.24 9,030.50 2,944.76 257.67 5,972,535.33 658,436.51 70°19'53.846 N 148°42'53.21 W 10,060.28 82.18 127.24 9,034.96 2,927.59 281.53 5,972,518.67 658,460.73 70°19'53.677 N 148°42'52.52 W 10,090.34 81.27 118.29 9,039.29 2,911.51 306.52 5,972,503.11 658,486.05 70°19'53.519 N 148°42'51.79 W 10,120.31 83.35 111.03 9,043.31 2,899.13 333.49 5,972,491.31 658,513.27 70°19'53.397 N 148°42'51.00 W' 10,150.67 87.88 105.04 9,045.63 2,889.77 362.26 5,972,482.56 658,542.23 70°19'53.305 N 148°42'50.16 W 10,180.63 91.90 100.97 9,045.69 2,883.03 391.44 5,972,476.43 658,571.54 70°19'53.239 N 148°42'49.31 W 10,210.07 96.40 98.59 9,043.56 2,878.04 420.36 5,972,472.06 658,600.56 70°19'53.190 N 148°42'48.46 W 10,240.02 95.22 94.07 9,040.52 2,874.76 449.97 5,972,469.40 658,630.23 70°19'53.157 N 148°42'47.60 W 10,270.12 94.94 90.09 9,037.86 2,873.67 479.93 5,972,468.94 658,660.20 70°19'53.147 N 148°42'46.72 W 10,300.09 93.71 83.59 9,035.60 2,875.32 509.75 5,972,471.22 658,689.98 70°19'53.163 N 148°42'45.85 W 10,330.19 95.56 79.64 9,033.16 2,879.69 539.42 5,972,476.22 658,719.55 70°19'53.206 N 148°42'44.99 W 10,360.20 95.81 74.89 9,030.19 2,886.27 568.54 5,972,483.41 658,748.52 70°19'53.271 N 148°42'44.14 W 10,390.75 97.14 69.87 9,026.74 2,895.45 597.46 5,972,493.20 658,777.24 70°19'53.361 N 148°42'43.29 W 10,410.21 96.55 66.98 9,024.42 2,902.56 615.43 5,972,500.68 658,795.05 70°19'53.431 N 148°42'42.77 W 10,450.00 96.55 66.98 9,019.88 2,918.02 651.81 5,972,516.90 658,831.10 70°19'53.583 N 148°42'41.71 W Projection to TD 10/7/2014 12:52:03PM Page 3 COMPASS 5000.1 Build 61 • • • N O L N 0) a a) • 7 O) . co Q LL v o D E E oN mo O a) -6.) N m U O0_ C a C o N O L O C a 0 0 o c U t o ri a) L o Y X o X Q c N d cl- • 2 m dfn E 0 0 dN TO a L LL °) $ o co0 o Eo a a 0 o a O o 0 0 o 0 2 (v co o U r-- o W u) O O N O a m a m CV 0 EL 2 2 N N EN O m 2 N a O x X Eai V C aa ^ D 2 0 Ill ,,,,-- C L N C rn o o) Ei= U oo U cm O - a -od m .. J vr D z - a F.T. 0. 7 W o E D a) d LL CO "' O) O 2 U Q__X @ H m 2 >- O d . _ a N N O a X O L IL- , .0 °Cm J r. O a ...U d a) c U E0a) 0) a - a U •U) JO au Y H-a H o Yr v o L C•1 v • N 00 E D O N a a E a n co a) m a) Qo -a > a a) (7 O Y a) O N C ? O Q. r2• O) c _ O O O ..- d W o C c • a ui E o) a) c J x - >▪ m (v �) N 3 w c) a Z a CO m 'E E Q n E v r- E o o a) x x 3 > aa) a N N w C p D a a L U C r 16 •a <-cs 7 O 'Cr) d <D y a (° � Q 0 LL O O C LL p a O E E r` a) E a O. • E O N — O 5 d— 0 Z '.� c (5 cp 't ,� o E U m m to is ^ m o N z Y a (/) 0) d - c. v O co o Z E in U N O v o o aLL c7 ai a a) rn 0 vi N- Jo o e m m E E c a O m a a) LL ✓ z > 0 U) °_2.. m 0) U ico ix ¢ o m C cw o )c co o m a) T a co a ' C ~ H 5 U a) O z LL S > ,•• O_ W w ��a m 'n < z Y c/) o U • is H D U� Q U U O Q co 0 0 a`) m o a6 5D 3 E LL z U a a) a LL a 2 W LL z F o c; W J Z Y m OXi 0 z W U N W0_ YV^1 N 00 3 N z m {- W , o 2 O W Q J Dal W LL a v~i U a 0 w ^ " o0 p (O a z 111 O Cl. lO o Cl o (� Q13c m 2 N U >. z U m W a) W z 2 E LL coai O E co O D E >. m a) W F o Z a a a N m E U L U U o Q .L H cv U) a Z N aa) p) p a)E E Ec •.. a. E U v aN O a E c a o o U ° i m E ai N) . L .c H mO n c c m U T Up'D E ,O Z � N >m u , H LOE E a) m 'U ;C p. a YU La) a a V (o O <0 OO HO ` > O > D' j CC '5 n DDoDU a W U D U d Ce LL ( O 2 0 II • N .2 d O Ncoc = N E a) Q .c :: co < m co a o' C J ^ O_ O O O U E N F. 3 — _ r a 2 m I0 O N HSI o Etn mD - Z Z a 0 CD a) w a) a7 O r. N a E_ a H'" . a Oo U - co H H Q) ri CD N N n— N t- H 'f)CV N E , > > a7 O c, N «. 1'0 Ea O a) F U c . a z O o I) .. m a. C CC O J N N = ❑ Z ❑ c a E W r J a) O. w C7 Co CL U) < X U) w -f, c U g C) E CC am £ Z Z V C N O_ 7 ^ N O a � N O. O Z 7 O co ^ LL = C Q o j a O N O J N a 5 O Q. u0) (6 N - 41 N it a7 d 'n U m N U) a) m O d C N C a -O -O a' d 3 Q N = C 3 C O) al CO E .. O C O '5 J . O a ' t N jo ac N Q .0 g) mvN O > > z, O a ❑ mc W .o _ N O) _E CO N ON a)C C E C C NaEE7N E rn X F a Z H U m U .- d ro o o. H U E E o © C U Q V )43 E O O -8 D a) O a m coU) U 01- = CC 2 O U Z v p Ute' a a) N coco a' ` m 2 N m o o U N .N Z'H a a z E -O N d 3 O) C0 m N 3 a U) co a N ^ m TO. E a 2 F a Z a 0 I,Iz o c :2 m t2) ti E H w N c •E 2 °' a) J E fl c d O O ❑ O m m m 3 a) a _a J_ .. a) 3 2 H °o a o u LI H O i w c ' a o) uai m E Ill Q O ce - z w a a 71 a) a) c a E a N 3 E a m N 0 U > z a. z z v UW GI W Q a) c T H O 2 C m O o J H C ,2-, E a7 L 3 cr co CV Z U a) � N C p o iii E m O U v) Ea. U a) J o co m 3 z o o O on COn 5 2. 12 > a NNap V 3 pa N U g U O N LO N To W 7 3 %E O % (a LI) aC a d3 JO .0 E � > C > O) O 05 C a .. a)E dp a V O � a C H C E N if 0 a W 0 7 H H 0 U D m U m H I 0,,N I///,' e.! 1 HE STATE -:_,a L T . ,: ,,_`. :,),.'!C,. ,:,a6 „--, -r :-1:- 1, ,/ � ) \ J. ,I1--_4\:i r\2`i Erli F 'cllUt 16%" ---:- .7,-- i;ovi 1::\'()it F..� !' i'AI2\1 Li_ Hr\,�rioraq,e, P.laska 99501 3572 ''', / v,C7i r ?fl' 279 1 39 '''. -1___'___115_ ,V ' :' c c John McMullen Engineering Team Leader BP Exploration(Alaska), Inc. Post Office Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU G-01 B BP Exploration (Alaska), Inc. Permit No: 214-103 Surface Location: 2063' FNL, 1974' FEL, Sec. 12, T11N, R13E,UM Bottomhole Location: 812' FSL, 73' FEL, Sec. 01, T11N, R13E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name PBU G-01B PH and API number 50-029-20214-70- 00 from records, data and logs acquired for well (name on permit). This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, P;a_4.,(4_ Cathy P. oerster Chair DATED thil day of July, 2014. STATE OF ALASKA RECEIVED ALA: )IL AND GAS CONSERVATION COMM' )N PERMIT TO DRILL JUL 10 2014 20 AAC 25.005 1 a.Type of work: 1 b.Proposed Well Class: ®Development Oil 0 Service-Winj ®Single Zone - 1 c.Specify if well Q eo� 0 Drill • 0 Lateral ❑Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 Coalbed Gas 0 Gas Hydrates 0 Redrill 0 Reentry 0 Exploratory ❑Service-WAG 0 Service-Disp 0 Geothermal 0 Shale Gas 2.Operator Name: 5 Bond 0 Blanket 0 Single Well 11.Well Name and Number: BP Exploration (Alaska) Inc. Bond No 6194193 PBU G-01 B • 3. Address 6 Proposed Depth: 12.Field/Pool(s) P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 11700' - TVD 8965'ss • Prudhoe Bay/Prudhoe Bay . 4a.Location of Well(Governmental Section): 7 Property Designation(Lease Number): Surface. ADL 028280 2063'FNL, 1974'FEL, Sec. 12,T11N, R13E, UM • Top of Productive Horizon: 8.Land Use Permit 13.Approximate Spud Date: 843' FSL,2105' FEL, Sec. 01,T11N, R13E, UM October 1,2014 Total Depth 9.Acres in Property: 14 Distance to Nearest Property: 812'FSL, 73' FEL, Sec. 01,T11N, R13E, UM 2560 12250' 4b. Location of Well(State Base Plane Coordinates-NAD 27). 10.KB Elevation above MSL' 67.85' feet 15.Distance to Nearest Well Open Surface: x 658241 • y-5969586 ' Zone- ASP4 GL Elevation above MSL• 33.25' • feet to Same Pool 350' 16.Deviated Wells. Kickoff Depth: 9500' feet 17 Maximum Anticipated Pressures in psig(see 20 AAC 25 035) Maximum Hole Angle. 96 degrees Downhole. 3386 • Surface 2506 • 18. Casing Program Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 3-1/4" 2-3/8" 4.6# L-80 TH511 2250' 9450' 8558'ss 11700' 8965'ss 77 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth ND(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth ND(ft). Junk(measured) 11852' 8955' 11214' 11804' 8962' None Casing Length Size Cement Volume MD ND Conductor/Structural - 110' 20" 270 cu ft 27'- 137' 27'- 137' Surface 2657' 13-3/8" 6276 cu ft . 35'-2692' 35'-2692' Intermediate 8136' 9-5/8" 1400 cu ft Howco Lite,250 cu ft Class'G',135 cu ft Permafrost'c' 34'-8170' 34'-7420' Production Liner 2390' 7" 93 Bbls Cement _ 7727'- 10118' 7036'-8986' Liner 1872' 5" 235 cu ft Class'G' 9974'- 11846' 8940'-8955' Perforation Depth MD(ft): 10090'- 11796' Perforation Depth ND(ft). 8978'-8963' 20.Attachments. 0 Property Plat 0 BOP Sketch 0 Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis 0 Diverter Sketch 0 Seabed Report 0 Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date 22. I hereby certify that the foregoing is true and correct: Contact Nathan Sperry, 564-4258 Printed Name,�jnJohn McMullen Title Engineering Team Leader Email Nathan Sperry@bp.com Signature J W Phone 564-4711 Date 7AD/it/ ��vv [[[[//// Commission Use Only Permit To Drill ,� / / API Number. Permit Approv ate' See cover letter for Number: �C../4 /l�� 50-029-20214-02-00 la(004(1 other requirements Conditions of Approval. If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas EtV ��// contained shales: Other Samples Req'd 0/Yes LSf No Mud Log Req'd: ❑Y s [ No Be P 741-57` fa 5.5&0 p 5 i HAMeasures: [i► Yes 0 No Directional Survey Req'd I Yes ❑yo Spacing exception req'd. 0 Yes B'No inclination-only svy Req'd. 0 YesNo l'.).14? //J� ^I APPROVED BY APPROVED BY1 OMMISSIONER THE COMMISSION Date 7-2- —( Form 10-401 Revised 10/202 This er it i621,NtAt the date of a roval 0 AAC 25.005 Submit Form and Attachments In Du�to VLF 7lz 2 /i P � � pp � 7/�//i7)) 7 /f'- /X To: Alaska Oil & Gas Conservation Commission From: Nathan Sperry 0 b p CTD Engineer Date: July 9, 2014 Re: G-01 B Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack lateral from well G-01A by the Nordic 1 Coiled Tubing Drilling rig on or around October 1, 2014. The G-01 B sidetrack will exit through the existing 3-1/2" tubing and 7" liner and kick off in Zone 4, and target Zone 1A/1 B/2A reserves. There is a planned pilot hole to determine whether the HOT or BSAD is the base. The plan calls for 225' of the pilot hole to be plugged back via a billet and sidetracked to Zone 1A. The proposed sidetrack is a —525' pilot hole (to be plugged back) and a —1,900' horizontal Ivishak Zone 1A producer, which will access a —36 acre Z1A reserves target and a 20 acre Z1 B/2A reserves target south east of the parent well. The lateral will be completed with a 2- 3/8" L-80 liner which will be fully cemented and perforated. t:TO Rig Work(scheduled to begin October 1st, 2014) f '?—/- / 1. MIRU and test BOPE 250 psi low and 3,500 psi high. (MASP 2,506 psi) 4 _¢/-0 2. Mill 2.80"dual string window and 10' of rathole. 3. Drill pilot hole: 3.25" OH, 525' (12 deg DLS planned). 4. Set anchored billet to PB pilot hole (PB 225'). Th t S • 5. Drill build: 3.25" OH, 300' (20 deg DLS planned) , 6. Drill lateral: 3.25" OH, 1,600' (12 deg DLS planned). 7, Tr) 7. Run 2-3/8" L-80 liner leaving TOL at—9,450' MD. 8. Pump primary cement job: 16 bbls, 15.8 ppg, TOC at TOL.* 9. Perform liner cleanout and RPM/GR/CCL log. 10. Perform liner lap test to 2,400 psi 11. Perforate liner based on log interpretation (-1000'). 12. Freeze protect well to 2,500' MD. 13. Set TWC, RDMO. Post-Rig Work: 1. Re-install wellhouse, flowline and pull TWC. 2. Set liner top packer with slickline if needed* 3. Set GLV's 4. Test Separator *Approved alternate plug placement if liner lap test fails per 20 AAC 25.112(i) Mud Program: • Milling/drilling: 9.5 ppg PowerVis for milling window and drilling (961 psi over-balance). Disposal: • All Class I & II non-hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >11 must go to GNI. Hole Size: • 3.25" From 9,500' MD to 10,025' MD (planned pilot hole, will be plugged back) • 3.25" from 9.800' MD to 11,700' MD , Liner Program: • 2-3/8", 4.6 lb/ft, L-80, 511 Solid liner 9,450' MD— 11,700' MD. • • A minimum of 16 bbls of 15.8 ppg cement will be used for liner cementing (TOC 9450' MD). • The primary barrier for this operation: a minimum EMW of 9.5 ppg. - • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional: • See attached directional plan. Maximum planned hole angle is 96°, inclination at kick off point is 40°. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. - • Distance to nearest property— 12,250'. • Distance to nearest well within pool—350'. Logging: • MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section. •' • Cased hole GR/CCL/RPM logs will be run. Perforating: • SWS 1-11/16", 6 spf, perf guns, 1" CSH work string, &2-1/16" CSH. • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti-Collision Failures: • G-01A: parent well fails at KOP • E-37A: fails at 10,868' MD, 333' center-to-center, active producer, will be shut in. • E-37AL1: fails at 11,491' MD, 410' center-to-center, active producer, will be shut in. • E-37APB1: fails at 10.868' MD, 333' center-to-center, plugback from E-37A. Hazards: • G-pad is not considered an H2S pad. • G-01A had 8 ppm H2S on 3/26/2014. • The lost circulation risk in 02-09D is considered to be low. Reservoir Pressure: • The reservoir pressure on G-01 B expected to be 3,386 psi at 8,800' TVDSS (7.4 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft)to surface is 2,506 psi.v • An EMW of 9.5 ppg for this well will provide 961 psi over-balance to the reservoir. Nathan Sperry CC: Well File CTD Engineer Joseph Lastufka . a a. M I 1 mt a o J o. Q W I co m L Q _ M c O 111ti. .0 w `3 CU V "o W oa a ig= 0 g0cc a woe Z it g'0 � a m o illz 0' m . . . . . . . . \\ za z * © CO .0 .c." , G « g \\ (N & = 29 ( j // . Co 5 > to \ � � j § § ) ) § ) / \ \/ . c £ w E o co ] 2« e { \ « �] \ \ \ . \ \ )It - \ `- � Gj )\ k ) \ 3 3 S { § F E ° d g 2 { c I uJ 200 k SEG E > -1 -1 6 § ]§ tea°) § \ \ I co) § ; , § ) E k= 9@ ° § a � - 9 . w •. 0 = = ) oa760 � 6 a ° ) ) fes/ E � o � | co co co 0 ai t 0 / ■ zjo � _ 0 c) k � ° E t \ CD \ \ � a) CC k0 C_ 2 a <c .. EL CCIk a) I— 0 o 0 X88 } I � - I B , CO a CO b .. 5 t /f f b 2 §co ai \ zWi k § k cp 2 zw g� �Ego + - z o_ m . . C § — co a E ± } • 2 ~ k § )7 E ) § ƒ % ± CO- ti / CO . o \o wz Ce r 0CD \ / -0 ¥ \ \ § § § . CO V' o E ~ \ )- c 0 \ CO - 0 c ca 9 ± )g « 0_ 0. 0 ± k = \ \) u)\ f al o § § { 2277 \ §$ } t + + z p2a_ 63E .. m £ { o ( § § � k \ k \ B C . faC ) e ; o , a owo . .0 % m0N o. . % ) $ a 2 $ q ) ) \ (7 gg � . R ° g a a § % s . § _ co $ € r o � � ■ ao 0. Cl)� � ■ a� � ■ ■ CO( 02 « > / A O 0000 O O O 1- O O L- N o (D 0) 0 0 0 0 0 O 0 0 0 0 0 0 0 0 a a 0 0 0 0 0 of 0 0 0 0 0 0 0 0 � JD rn co a) a) a, a) a) o) 0) 0 m C e W .- o" -- -0 co m V oO LO C (0) d V) o Q On (O V N O CO n N N CI u) CO 4 Q 7 d W (D (O (D 0 0 N (O N O u) C) U 0 n O n u) (O (O ui V V N N ai a) u) 0 00 (a 0 N N N a) N N V N N C) 0 Z N M M C) V u) u) (D n OO co a) (D Q d a U 0 ca ; o 0 > — o D' O ti_) d oac -a C) c Y To 0 N N O O O O O O O O O O O O O O > Q) Z 0 O O O O 0 O O O 0 0 0 0 0 J . 3 a O O O O O N N N N N N N N N OI N 0 ' N N N N L- L- L- L- L- .- L- L- O (n ,. u)E7 0 ,- a d 3 d a�io C 2 p ° 2 N ❑W c. C) C) CO u) u) Y') )O N O 0) OD N V 0) a) M O C) C) a) 0 a0 CO O N u) O V N V N OO aO O V y N O o O O n o O O N N O O m W d .0 c N C) V N (O n n CO W W O O C 0 C 00 co- m co-m co- co-O O O co. co- co- co- a) 0) ai L - �-' u) u") V7 u) )1') u) (D u) u) u) u) u7 u) u) w d 0 7 CO O CO O U) (O CO (O CO (O u) (0 (D 0 Or W C d p c_ d a) o La a a C C 3 C V d 7 L N N u) C) (D V O n N N W n 0) 0 ` C d .N.. } .: 0) Cl O (O u) n W V CO n N O V 4 d w 07 'N 'N u) (O V O O V V m C) 0) N u) u) od : d' T N E co co n O u) V a C) CO V u) (O n u) V N 3 oN u) u) u) u) u) LO NN LO N u) N u) u As 0 d L O C (.4- '.E ` n N N N N n N- n n Nn n n n N N N N n N- n N- Nn .- pa+ pa 0, o) moaoCmCO o) o) o 0) a) Jrz y 0 Y Y _ ui u) uuui 1.6 ui )fuuO 6- '0 m + 0 + m Z C g d TYCO r- N o - am alm Cu) 0. G N- u) V N O OD n N N C) u) C) 4 N V▪ d ❑ C ❑ C ❑ W O O O O O N O N O u) C) Ce y n m n ..6 CO O u) a V N N ai Oi u) d N U CO ate') N N N O) N N V N N CI L- 0) p 0 g g c g N C) Ci C) V (n (a m n m CO m a m I0 0 a) W VI V CO CO N CO n N V N n N- CO m CO CO N O V N n N N 0 a) (O U) CO M 2 0 0 a) OO V a0 a0 ON n O O) Ni O d z z 00 N- 0 0/- V V V (D u) n n V V N d 0 W w m CO 0) CD CD 01 a) a) rn a, m m 0) 0 co A a a N - N N N N N N N N N N N N N Na. Z 0 ❑ + ❑ + ❑ z g • F 0 2 ? 2 Z 2 n O CO O O u) C) CO (--- C) OD CO N a) 0 n CO )D V CO CO n n N (D (0 (O u) O O) a) u) )D u) u) u) u) N N u) LC) N (D (O u) (0 CO CO (0 u) CO (O (O O CO 0 0 CO o) a) O a) T 0) W o) W a) 9 y (D 00 co- OD co- OD a0 a0 OD aD co- co- OD OD 0 N O 7 L N • Q E o O (? a) o) 0) O) 0) CO OD CO O V V V CO m C) CO CO CO O) -9 T o) W W W m C) CO O CO DD m m DD m N W n 7 V (O 6 O m a m a) a) a) a) 0) a) m n n CO 0) 0 0 d -O CO CO o m c a d d N YD CO CO CO CO .N a ) a, N ..- 0 0 o a • O N N N N CO CO Y m 0 C C C C 1 CO n 7 .. .. a0 O O a0 O CO CO C) C) C) C) N N N N N a a a d u) ul u) u] n 0 O O O O O O O 0 _ u) u) u) u) u) O6 O O O O O O O d NL- 0000 00 O O O O C) u) N- 0) CO O) O) d) m 0) 0) m T 0) to UJ n O O O O (d,) > p D O a) O O (O O"C d3 V ) N- COm a) n C :... CO a I- = DD O W a) a) ,- J o as 0 '; co r) L L o ? m o o E • o Z a a (? (? d ` NOL- 000 O O o O O O) O O O O O O O O O liri O O aD 0 0 0 O O O O O d O O O O O O O O o Z ' N O .nO- W O O COOO a O O O 0 c- O O O O O O to a V n O o) (3...1 O 0 O O o O O n O O N O 0 O N O (") ao O) a) a) O) _ co a) O .- N .- N CO C) V u) (O (0 n ulie d E c p a) d a) 0 0 0 = 0 0 0 0 0 0 0 0 o p 'i C .. d i- a - * = F r r r W .- C) r r V Y Y r b 42 .7 a u d C m d v a o) c m n. 7 0• a N O U) dCO N- . 0 0 0 0 0 0 0 0 Lo O) 0 0 0 O O O O 0 0 0 0 0 0 -0 0- C 0 0 0 0 0 0 0 0 0 0 0 0 0 .Q m co CD a) a) CO a) 0) a) a) a) co a) 0) a] 0u ti ^ o U LL C O U O c 6 N7 N n f` V N W N V N N. O N N. N N W CO N W I,- W N N R a) W Z N• �� V MNN W O O O O O W O O U Z O N CO d' 7 La W W N. CO a) N Q 0 ��W` N r r r r r r r r r V O U) 7 O 0 > — O X O N a O (6 L.) 3 coTu N O O O O O O O O O O O O O N O Q O O O O O O O O O O O O O J 0 ,-— csi Ni r - p N= O (1) E u) 0 C , E J 0 N N O j 'c a 0 0 rL N F rG W ✓ N N. co 11) N. 0 N N. N W a) CO N. CO a) N. N� O � N M V (0 ri N C) o o N m vi M Ci NO Gi a) a) o a) W CC) a) CO W N. W CO W u -C7 co ,- N co M 7 N N tl) n co co o) 0 C o c a) a) cc ai m a) a) a) a) a) a) 0 0 t •- d-' u) Ln Ln in u) co co u) u) u) co 1)) W .2 N W W W W CD CO CD W W W W W W ID E W in O d c N O 7 R C_ d C CO 'p L) ipi y 7 N WLn CO N N a) R N. W C 'a C c u .- co V N CO W CO N N. N O a) W W Q N N .2 N N. 4 O W M W u) W 0 . _ O p 7+ N M M V N a) co O O c- O o co In co U) U) U) co R V Ln N U) N 7, IX d .0 C N N N N N Ni N N N N N N N m- K R L N. r N N. N. N. r N. N. N- M r N. N- o) N u >�> O Z tw a) a) a) o) o) a) o) CS) rn a) o) J ~ 2 2 cn 8 2 - u) N N u) u) N N co- u) u) N Ln u) co N 0 0. N N. N. V u) W N V N N. 0 N N- (I) W W M N a) C N. CO N u) a a) W CL V M V N W W CO CO M N O N O 0 0 0) O O O a) O N CO ? N CO W n W 0) CO W 7 I— =0 0 CL N co u) CD 0) 0 a) M W M 0 m M W M W CO N C a) N N W t` W ci- _ N 0W CO W ? W 4) 0) 0 W 1n i- N N M M 0 O N. W N. CO CO 0) a) O) a) a) a) a) co co co co co co N co .i^' N N N N N N N N N N N N N Q z 7 • 1n — — co Ln N N CO r ? R N 0 LI) u) N V V V V M CO M M M M u) u) u) u) u) In 0 0 N U) N Ln Ln CD CD W W CD W CD CO CD CD CD CD CD a) W a) W W a) a) 0 a) a) a) a) a) NCO- CO W W W W W W W CO- W CO- W CO- O CO 3 CO CO CO V' R C CD CO CO CO V V CO CO O N. N� N O M M u) 1)) u) 0) NW W W O NO) W O M co co N. N. co W ,- ,- 0 W N. N. 0) 0 n N Q• C 0 a CO CO ui W I a) 0 NnN N N N N N N N O 0 O 0 0 0 O O 0 0 0 0 0 a 0 00 0 00 0 0 0 0 00 0 0) a) O) 0) CO a) a) a) a) 0) 0) 0) a) CO 0 o >, u ^ o 10 c w o0 E CO n < o d m M N h t = w ,- 0 c 0 2 m o o o o z a a U 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 o O o n ' h >. 0 0 . 0 0 0 0 0 0 0 o co m O oO o 0 0 0 a) 0 0 0 L.) ,- CO rn m o N N co u) CO N- ,_ ,_ = G V o 0 0 m 0 13 r� c .. t a7 C � r- ao � 1 v a= I V G j� o C N , V m is E ?) 6 _ a .y c o E.I p D e d d N co N 17 uam33o a co N. . a Q 0) m 0 = v o U O C 0) a) to N eL • a p '-) U co Z U m Q U o o O o a o a o m O N N O m A Q a) CO C.:,..4 U a) • W N N O 2 E 2 N F W ui u -o C O O L w 0) N Le C W O ea_C .. U N V 2 VC d O 4wy A . O dNd d U N m Q O T. L m a za J F 2 Z co O 0 0 Q a) CL 0) O. c m co o o a o 0o m 0 m a CO O �_ -0 h E 2 N — a o m m O a c a a a U H W CO d' u) co N.. co H Q. Q 0)) 00 co f0 CO C C l) CO h O CO V O) V 41 C) O OO N 0) N W O th t7 u) coaO 7 u) rn a11.3 7 O + - C 0 0 U 0) U) U) r` N Co rn jp co V N N u) CO N O ✓ O) OD N- N U) si 0) ui o J 9 e 00) T CO Oa) cobON) 00) coo coo Z W Ni N N N N N N N N + a in N- O u) N- N N V' O O V CO N. 0 u) COC {o t 0) u) u) u) u) u) u) u) (n i7 a° LO 0 CO W O W O O COCD O O Q y Q a cococococo cococoO O U T C to E m 'O O O O O O O O O O W /O 'O O O O O O O O O O < O a m (� ` .0 O O L L O ig O O N- N N O) O O 0 m O O f6 A C 7 CO .- .- CO O) O N N- 0 ,-- Za aC7U a dG -- °) 0 0 0 0 0 H 2 a O co 0 li NZ m to O Mire CI -a O Q= i` o• " • C a = Q YU m E cc CS N Z 0a rn• 33a a 0 m -0 N. 1 ■ K k1 1 _ �w'V N Q ,:r.. N M W -' _ - s s E'' " A L 51_ _ F-' It �r3 o a - 8 c, f__'ry m I.-.'El _ 1 �zz,E4 4 y � m -- gNI _ - s ,-, 0 S ao a mo 1- - \ =' N -o -mJ m 00 Q G _:: oo O 0 0 0 o 0 o 0 m 0 Ca c a 4 n . m - m N n N u F- 0 03~ (u►Bsn OSI (+)quow(-)tuns oi 3 a o 0 L U 11.0II . 8 8 r °° 1N Q O I' o . ,..,m,—,..,,,,op $8$88888888 e -3 1-� 'gym^' 8 T o^38d oF3,'.., G,^ - 82 4 90-mc? §888888888 M 8 Bm=N2 -8z oo = ,EE 888888888 C7 o oy =a o e3N oRwwwwwww m T CL 3n c7 n -l'20 F. w m8oGR',i utm ``o N A - 0 NB4R,', a,4N Z 418A &Lgg m - 'm w �$58[�7, g8 8iIIIIIMMI2"8 `oY` s� .282222884-L4' a 2s 8*s;74,Vm2 F r, F $8m0000000 W '7>m88$Soo,88 0 1� X888888888 —Fig o< o �oo�a�88� w I m m a 1 1 oa a a 0 28 d (uiusn 09)qudaQ rno►uaA anal 11 H \ W 'AINZ M2 —T Q= K m N M - 9i6 \50,0 NQ 8 .-.97 " a 5 a8„ : : N b b a a r.955 - • N g iaca q y@Eiji 0 c7 F06 I.:. . Aci o7,7, 23E (~/ rv � r- r'i F KEgg4 \ • L8 Mil 8 a n 12 S ao C1 m4 W 0 '72 [gym _ v0 FN O0� = W . v P7 i o �u m n I rn v+ R7 i r -0(3-mu C7 01 pp N aac7 t49� 2. , c. - $Z(6 •O. 3 3 W SO 8902 N • r�1 n _ - a m C 2: _.. a. M [S68 F4 ii W N cwt o ag. ,:. ,_ ti, s g 4 s ;. .g R. 4 s . s p.. i .-.4. gg g 4 s a(twusn 08)(+)quoN/(-)Alnos N N N N N N = III ai hi 1 a m a o » 3 3 a 99 533 '6' 3 ; 3 m m e> M w $3 1388888888 .� W w N A N H : ,1 ? "' 3 A m o a o o c5 _ 0 5 g N om^.32gm.m > o'oro c� 5 m 5 5 N u m c� c� c� c, m a a 5 m m a f 3 ...� � ,.....0000 z3z3 N N ` a e N e m m o 0 0 0 0 ? m m y ocNNNNNNNN > s_� - N o M Lo meEILf.'m Q N N N M M "LVmrvmym.- o 0O datum . 1 1 / M i + 1 M M M / 1 + + 1 M 1 / + 1 M + + 1 + 1 Al' r ''''':-:”2 K a9m&mm w 3- N o wmecornmm 0 s c zomg J m m 3 o Zmm'"N2s� m �E��� '> > 33ry 3 S< m > N > m > m o c ^ m NNNRNN NN m k to m > M> a m a W'> a 3 a ' W w 3 .>> - a 5 ' > ' S : 5 eemw mm3 ''n°rvaS . _ - '^ ^ F,e-3^N Neo 4 '-' I 'u'', wm w u''' '‘7 ,- LL c� IA `� `� `�m J � `&m`$�$A'& '&m gom0000 w "a.W.a m a a Lu a w.a a a a ' a 999999999 A Qq e 1 ; tn. m ry tgW LL 0 0 0 'U 0 U' 0 0 0 0 0 0 o imam m 8......- r.2mo W W W W W w'u W W W W W W W LL 99 4 0 4 4 '4'4' 4 4 4 4 g 000moo'o 00000000 1 1 + 1 1 + t i + 1 + + 1 + + + t 1 1 1 1 + 0 1 1 1 + . 6 pqa nc LL'cogg$ ` 55 m oomommmmmm W1 o mooemm6__ wol for.ic. I I I I I I I I I I I I I I •1 y.Nn a v'm,com '1m 4. G o W G O O n o tt'qq U O ^l\\ C] 0o E Z N1E 0L tee9 y i c.. Q Z �l OmlUd Q O ,:eO1°.°llIllIlll./Ai"IIIIMIIIIII to 4 BEmc -- o ., \� O u ,"iv q �2.5fs ° C i gtA ifirtriffirlite li �prc ca a C N - o 1 cn All) - • Wc Ilk:VIC J m w > N - m U _ 8a.7i C 2m- °q N /111441111. t Z aa� w N E uNi 36'' o 6 - - Z E //�� L 0 _ - M N • N N N 7 f ■: r BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB G Pad G-01 500292021400 G-01B Plan 3 Travelling Cylinder Report 08 July, 2014 Øbp ES kW BP BAKER MASHES Travelling Cylinder Report 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-01 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB G Pad MD Reference: 2:01 11/24/1993 00:00 @ 67.85usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: G-01 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore G-01 B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 3 Offset TVD Reference: Offset Datum Reference Plan 3 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 9,800.00 to 11,700.O0usft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,366.72 usft Error Surface: Elliptical Conic Survey Tool Program Date 7/8/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 106.02 8,106.02 1 :Camera based gyro multisho(G-01) CB-GYRO-MS Camera based gyro multishot 8,170.00 9,497.81 2:MWD-Standard(G-01A) MWD MWD-Standard 9,497.81 9,700.00 Plan 2(G-01BPB1) INC+TREND Inclinometer+known azi trend 9,700.00 9,800.00 Plan 2(G-01 BPB1) MWD MWD-Standard 9,800.00 9,960.00 Plan 3(G-01B) INC+TREND Inclinometer+known azi trend 9,960.00 11,700.00 Plan 3(G-01B) MWD MWD-Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 11,700.00 8,965.30 2-7/8" 2.875 4.250 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB E Pad E-13-E-13-E-13 11,025.00 11,444.00 1,191.02 1,138.28 54.99 Pass-Major Risk E-13-E-13A-E-13A 10,375.00 12,225.00 1,213.41 1,139.75 74.17 Pass-Major Risk E-25-E-25A-E-25A Out of range E-33-E-33A-E-33A 11,650.00 11,920.00 1,272.65 404.13 868.97 Pass-Major Risk E-37-E-37-E-37 11,464.09 11,000.00 783.99 422.52 368.47 Pass-Major Risk E-37-E-37A-E-37A 10,868.67 11,600.00 333.02 399.85 -58.25 FAIL-Major Risk E-37-E-37AL1-E-37AL1 11,491.00 10,950.00 402.08 409.95 -4.77 FAIL-Major Risk E-37-E-37APB1-E-37APB1 10,868.67 11,600.00 333.02 400.10 -58.51 FAIL-Major Risk E-37-E-37PB1-E-37PB1 11,464.28 11,000.00 786.59 422.62 370.94 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 7/8/2014 4:41:29PM Page 2 COMPASS 5000.1 Build 61 Mill BP BAKER HUGHES Travelling Cylinder Report 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-01 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB G Pad MD Reference: 2:01 11/24/1993 00:00 @ 67.85usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: G-01 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore G-01 B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 3 Offset ND Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) ' PB G Pad G-01-G-01-G-01 9,802.77 9,950.00 484.86 317.56 248.00 Pass-Major Risk G-01-G-01 A-G-01A 9,978.60 9,975.00 178.56 149.93 51.89 Pass-Major Risk G-01-G-01 BPB1-Plan 2 9,824.87 9,825.00 1.74 0.99 1.15 Pass-Major Risk G-02-G-02-G-02 Out of range G-02-G-02A-G-02A Out of range G-02-G-02B-G-02B Out of range G-03-G-03-G-03 Out of range G-04-G-04-G-04 Out of range G-04-G-04A-G-04A Out of range G-04-G-04B-G-04B Out of range G-05-G-05-G-05 Out of range G-13-G-13-G-13 Out of range G-13-G-13A-G-13A Out of range G-26-G-26-G-26 Out of range G-26-G-26A-G-26A Out of range G-26-G-26B-G-26B Out of range G-30-G-30-G-30 Out of range G-30-G-30A-G-30A Out of range G-30-G-30B-G-30B Out of range G-30-G-30C-G-30C Out of range G-30-G-30CPB1-G-30CPB1 Out of range G-30-G-30D-Plan 7 Out of range G-30-G-30DPB1-Plan 8 Out of range 3-31-G-31-G-31 Out of range G-31-G-31A-G-31A Out of range G-31-G-31APB1-G-31APB1 Out of range G-32-G-32-G-32 9,867.84 9,601.84 1,191.12 454.62 921.13 Pass-Major Risk Offset Design PB E Pad- E-13-E-13-E-13 Offset Site Error: 0.00 usft Survey Program: 100-BOSS-GYRO Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth *NI-S ♦EI-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) F) (usft) (usft) (in) (usft) (usft) (usft) 11,025.00 8,965.47 11,444.00 9,013.04 11523 336.53 -2.55 4,129.39 1,252.75 5.625 1,191.02 1,138.28 54.99 Pass-Major Risk,CC,ES,SF 11,034.84 8,965.47 11,425.00 9,000.87 115.23 335.95 -0.78 4,135.01 1,26621 5625 1,196.32 1,128.18 69.97 Pass-Major Risk 11,039.84 8,965.47 11,400.00 8,984.86 115.23 335.18 0.59 4,14241 1,283.93 5625 1,203.72 1,121.69 83.50 Pass-Major Risk 11,050.00 8,965.46 11,325.00 8,936.82 115.23 332.87 4.07 4,16460 1,337.08 5.625 1,228.33 1,106.37 123.49 Pass-Major Risk 11,050.00 8,965.46 11,350.00 8,952.83 115.23 333.64 3.33 4,15720 1,319.36 5.625 1,219.72 1,10846 11259 Pass-Major Risk 11,050.00 8,965.46 11,375.00 8,968.84 11523 334.41 2.58 4,149.80 1,301.65 5.625 1,211.56 1,110.55 102.33 Pass-Major Risk 11,059.37 8,965.46 11,300.00 8,920.81 115.23 332.10 5.93 4,171.99 1,354.80 5.625 1,237.25 1,095.82 143.35 Pass-Major Risk 11,064.12 8,965.46 11,275.00 8,904.74 115.23 330.60 7.22 4,179.36 1,372.47 5.625 1,246.56 1,087.44 161.57 Pass-Major Risk 11,075.00 8,965.46 11,175.00 8,839.34 11523 32467 11.36 4,208.33 1,442.35 5.625 1,286.93 1,061.62 231.33 Pass-Major Risk 11,075.00 8,965.46 11,200.00 8,855.86 115.23 326.10 10.66 4,201.16 1,425.01 5.625 1,276.32 1,065.39 215.85 Pass-Major Risk 11,075.00 8,965.46 11,225.00 8,872.26 115.23 32760 9.96 4,193.94 1,407.58 5.625 1,266.09 1,069.37 20068 Pass-Major Risk 11,075.00 8,965.46 11,250.00 8,888.56 115.23 329.10 9.25 4,186.68 1,390.07 5.625 1,25623 1,073.34 186.01 Pass-Major Risk 11,086.85 8,965.45 11,150.00 8,822.71 115.23 32324 13.47 4,215.50 1,459.60 5.625 1,297.71 1,046.81 258.11 Pass-Major Risk 11,100.00 8,965.45 11,025.00 8,738.02 115.23 316.32 18.39 4,251.14 1,544.34 5.625 1,356.78 1,01646 355.15 Pass-Major Risk 11,100.00 8,965.45 11,050.00 8,755.15 115.23 31767 17.74 4,244.02 1,527.58 5625 1,344.30 1,019.94 33746 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 7/8/2014 4:41:29PM Page 3 COMPASS 5000.1 Build 61 TRIS= 4-1/16"-5M WELLHEAD= 13-5/8'-5M kit EVOY SAFETY NOTES: WELL ANGLE>70°@ 1 0000'. ACTUATOR= BAKER ***CHROME LNR*** OKB.ELEV= 61.83' BF.ELEV= 26.86' KOP= 3206' 2170' 3-1/2"OTIS XBD SSSV LAND MP,D=2.75" Max Angle= 100°@ 11589' DatumM3= 9814' Al Datum TVD= 8800'SS 2186' —I 9-5/8"FOC —1 2691' _ L_--9-5/8"DN F1CR 13-3/8"CSG,72#,N-80,D=12.34T' H 2692' , GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE— L 2 4377 4260 37 CA-MMG DMY RK 0 05/04/14 1 7182 6570 32 CA-MMG DMY RK 0 05/04/14 TOP OF r LNR I 7727' _ 0 o ' 7734' — 9-5/8"X 7"BAKER LNR HGR/PKR WrTBI ID=6.188" 9-5/8"CSG,47#,L-80,ID=8.681" -1 8170' 4 11 4 N Minimum ID =2.635" @ 9918' ,1 V 9-5/8"SIDETRACK wwow@ 8170-8215' 3-1/2" PARKER SWN NIPPLE j� 1 10% 7"LNR,29#,NT-80 XO 13CR-80 H 8755' I.....��N ��.��,, 9868' 3-1/2"PARKER SWS NP,D=2.75" 1.41ttk PERFORATION SUMMARY 11..111V 9881' 7"X 3-1/2"BAKER SABL-3 PKR,ID=3.93" REF LOG:SF'FRRY-SUN MWD ON 11/30/93 Vil.M.A ANGLE AT TOP F 73°@ 10090' �% EF: 9908' —3-1/2"PARKER SWS NP,0=2.75"J Date:Refer to Production OB historical pert data 11." SIZE SFF IVTERVAL OPN/SQZ SHOT SQZ ` 9918" —13-112"PARKER SWN NP,D=2.635" 2" 6 10090-10180 0 04/02/09 3 318" 4 10280-10315 0 12/15/92 9930' H 3-1/2"TTL WLEG,D=2.992" 3-3/8" 4 10370-10680 0 12/15/92 1- 9934' —E_MD TT LOGGED 02/21/98 l 3-3/8" 4 10850-11050 0 12/15/92 3-3/8" 4 11510-11635 C 12/15/92 3-3/8" 4 11685-11796 C 12/15/92 9991' — 7"X 5"BAKER :i HGR/PKR,D=4.312" I 3-112"TBG,9.2#,L-80,.0087 bpf,D=2.992" ,—{ 9930' Mk TOP OF 5"LNR H 9974' ` 11214' H IBP(04/02/09) 7"LNR,29#,NT-80,.0371 bpf,D=6.184" —{ 10118' • -7%• PBTD H 11804' ; 5"LNR, 15#,13-8CR, .0188 bpf,0=4.283" H 11846' DATE REV BY COMMENTS DATE REV BY CO V?ENTS PRUDHOE BAY LINT 06/18/76 ORIGINAL COMPLETION 05/20/14 PJC GLV VLV/PR NLRu 3E RWG CORECT WELL: G-01A 12/17/93 SIDETRACK COMPLETION PEF vIT No:9931710 09/20/01 RNTP CORRECTIONS API No. 50-029-20214-01 07/13/03 CNKXTI_P KB ELEVATION,MAX ANGLE SEC 12,T11 N,R13E,2063'RI_&1974'FEL 05/31/09 MCZ/TLH BP SET&ADFFS(04/02/09) 05/08/14 MBM/JMD GLV C/O(05/04/14) BP Exploration(Alaska) TREE= 4-1/16"-5M '' VVELLF-EAD= 13-5/8•-5M d1cEVOY SAFETY NOTES: W ELL ANGLE>70'ta 10000'. ACTUATOR= BAKE2 G-01 ...CHROME LNR*** OKB aEV- a.-_---_- 61.83' BF.aEV= 26.86' KOP= _ 3206' . I_ 2170' --i 3-1/2'0115 XBD SSSV LAND NP,D=2-75" Mjx Angle_-.__...--100 611589' •Datum MD= 9914' ------ -- -------- � -- 2186- 9-5/8"FOC Datum TVD= 8800'SS .,4. { 2691' I-t 9-5/8"DV PKR I 13-3/8"CSG,72#,N-80,1:11=12-347" J-i 2692' I-, I. GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH FORT DATE i Tbg punch,circ cement to 2 4377 4260 37 CA-MMG DMY RK 0 05/04/14 111 7182 8570 32 CA-MMG DMY RK ,05/04/14 05/04/14 5800'MD TOP OF 7"LNR -I 772T 0 0 7734' I- 9-5/8"X 7"BAKER LNR • ■ HGR/FKR W/TBE,D=6.188" 9-5/8"CSG,47#,L-80,D=8-681" -- 8170' •, �• Minimum ID =2.635" 9918' �j j1 9-5/8"SDETRAOK WENDOW @ 8170-8215' 3-1/2" PARKER SWN NIPPLE .1 7 PERFORATION SUMMARY i1#I s REF LOG:SFE RRY-SUN PMD ON 11/30/93 �1111111�1 9858' - 3-1/2'PARKER SWS NP ►11►►% D=2.7.75' ANGLE AT TOP PERF: 73'©10090' ,►111►►1111%, Note:Refer to Production CO historical pert data 11►111111/111�� 9881' 7"X 3-112'BAKER SABL-3 PKR SIZE SPF INTERVAL OPWSQZ' SHOT SQZ •►•1.��1.1.1.%'; D=3.93' 2" 6 10090-10180 0 04/02/09 -- 3-3/8' 4 10280-10315 0 12/15/92 \ 9908' 1-13-1/7PARKER SWS NP,13=2.75" 3 3/8" 4 10370-10680 0 12/15/92 , 9918' F-- 3-V2"PARD R SVMI NP 3-3/8" 4 10850-11050 0 12/15/92 TOWS 9500'MD j D=2635" 3-318" 4 11510-11635 C 12/15!92 180 deg ROHS 3-3/8" 4 11685-11796 C 12/15/92 40 deg ' `'11 -- ; 9930' 1-13-1/2"TTL WLBG,13=2.992" / '. 9934' H ELM°TT LOGO 02/21/98 I Cmt Rtr @-9800 44, 9891" - 7 x 5"BAKER Tbg punch @-9813f. HGR/PKR D=4.312" CIBP @-9835 44,W 3-1/2"TBG,92#,L-80,.0087 bpf,D=2.982".] 9930' ` 11214' -1B/3(04/02/09j • TOP OF 5"LNR F-L 9974' j r 7"LNR,29#,NT-80,.0371 bpf,13=6.184' H 10117' -.. 014,„,- ` PST()1-F „804' ,, 1 5"LNR 15#,13-8CR,.0188 bpf,D=4.283' J- 11846' I I DATE REV BY COMMENTS [GATE REV BY COMMENTS PRUDHOE BAY UHT 06/18/76 ORGINAL COMPLETION 05/20/14 PJC GLV VLV/FR NUMBERING CORECT WELL G-01A 12/17/93' --- SIDETRACK COMPLETION - PERMT No:'1931710 09/20/01 RN'TP {CORRECTIONS - AR No: 50-029-20214-01 07/13/03 CMG/TLP KB ELEVATION MAX ANGLE SEC 12,T11 N,R13E,2063'FM..&1974'FEL 05/31/09 MCZ(ILH BP SET&ADPEiFS(04/02/09) _ 05/08/14 MBMJMD GLV 00(05/04/14) BP Exploration(Alaska) TREE= 4-1/16"-5M "V1EJJf.AD= 13-5/8"-5M NtEVOY I SAFETY NOTES: WELL ANGLE>70° 10000'. ACIL1ATOR= BAKER G _0 1 ""CHROME LNR"" OKB.ELEV= 61.83' BF.ELEV= 26.86' KO_P= 3206' ® 2170' IH 3-1/2'OT1S XBD SSSV LAND NP,D=2.75" 1 Max Angie _ __— 100°@ 11589' Datum ND= 9814' ' ..... — 2186' { 95/8'FOC Datum TV D= 8800'SS = =- 1 J _ 2691' L_9-5/8"DV PKR 1 1 13-3/8'CSG,72#,N-80,D=12.347" H 2692' 1-41 , GAS LIFT MANDRELS ST MD 1VD DEV TYPE VLV LATCH PORT DATE d 2 4377 4260 37 CA-MMG DMY RK 0 05/04/14 Tbg punch,circ cement to 1 7182 6570 32 CA-MAG DMY RK 0 05/04/14 5800'MD I TOP OF 7"LNR —1 7727' 7734' — 9-5/8"X r BAKER LNR HGR/PKR WRBE,D=6.188" 9-5/8"CSG,47#,L-80,ID=8.681" 1— 8170' 1 1 r — Minimum ID =2.635- @ 9918' 4 9-5/8"SIDETRACK WIDOW @ 8170-8215'. 3-112" PARKER SWN NIPPLE 4 4% TSGR 927 F'ITIFORATIONSUMMAFZY • 4 \l \ `;C to TOL 98x58' I— 3-1/2'PARKER SWS NP 444 FIEF LOG:SF ERRY-SUN WO ON 11/30/93 cr14, \ D=2.75' ANGLE AT TOP PERF: 73°@ 10090' �����4.1�•, \ ••• 9.♦ Note:Refer to Production DB historical perf data ••••••♦ 9881' 7'X 3 12'BAKER SABL-3 PKR SEE SW I4TB VAL OPTYSOZ SHOT SQZ TOL 9450' j D=3.93' 2' 6 10090-10180 0 04/02/09 Cnt.to leave bek. Shublik(9390') ' 1H3-1/2"PARKER SWS NP, =2.75' 3-3/8' 4 10280-10315 0 12/15/92 3-3/8' 4 10370-10680 0 12/15/92 TOWS 9500'MC 4'' 9918' 3-1/2"USVVNNP 3-3/8' 4 10850-11050 0 12/15/92 180 deg ROHS 3-3/8' 4 11510-11635 f: 12/15/92 3-3/8" 4 11685-11796 12/15/92 40 deg ;; 9930' —31!2'TTL V11LEG,ID=2.992" 9934' H-MD TT LOGGED 02/21/98 x 5"BAKER Cmt Rtr @9600 Mk 9991' [— 7" Tbg punch @-963C i.HGRIPKR D=4.312" 2-3/8"L-80 to CIBP @-9650 t: 11,700'MD TD 3-1/2"TBG,9.2#,L-80,.0087 bpf,D=2.992' 9930' • L 1� i1 11214' ! IBP(04/02/09) 1 TOP OF 5'LNR — 9974' 7"LNR 29#,NT-80,.0371 bpf,D=6.184" H 1011T ` • PB1D 11804' • 5'LNR,15#,13-8CR,.0188 bpf,0=4.283" H 11845' DATE REV BY I COMMENTS DATE REV BY ' COMMENTS FRUDHOE BAY MR- 06/18/76, NT06/18!76 ORIGINAL COMPLETION 05/20/14 PJC GLV VLV/PR NUoBERSIG COLT WELL G-01A 12/17/93 SIDETRACK COMPLETION FERMI No:'1931710 09/20/01 I1'.VTP CORRECTIONS API No: 50-029-20214-01 07/13/03 CMO/11.P KB ELEVATION MAX ANGLE —^— SEC 12,T11N,R13E 2063'RI_&1974'F . 05/31/09 MU/TLN BP SET&ADPERFS(04/02109) 05/08/14 MBANJMD GLV d0(05/04/14) BP Exploration(Alaska) a • a. co co t a o J 0. Q W Ce CO a C) C Q t N • d CO ti 0 o li VI ._ ca m c° V N W • i s a m a ,; MI o a W ,_ mcc ca �X2 Z Li- at90 a CO o m N z .' a a n oo, z3 Z 3 N S n Tr 2 co 0 . '6 N O O) C O O") O N N O Lr, 0) • v O (7 = _ O r Q Lo 0 0 Lo U ((O Q Ua 0o O O a' a U p N a U a) O �pp t•-) m Y 0) U N 0.) T Z LEI > m U N Y >> O) 01 > 2CD N H i OW d N N C O 07 7 d r C O O) J J (. 0) > 0 7 O 1Ol U N C N O V CO 0) L J J (J L a, N- wW co a) 2 c Z c m F P. O y c C d (O.) i0 E '9 •-• a ° 113 C ° 7 - C i0 it o 4 °' O w d d (.1 N 0 I . . c CO O V °' m a w CO o v_ - • 0 U o t' a ate. N .- O W tai) N O' �_ OOi J ri 2 f/I o N IF o n N b O O O CO N 00 O fa m ao d N m 0 of Cr m O u' Q er a GG. a .C1 r .,..., D N H 0 0 0 3 xOo ° I )+" O M N ta C) N 7 > N a) °i L• C IxO1 'O Q t' c Of a) c O N 2 .0 C .0 .2 2 W 0 r Y) A 2 W 3 uu) O a Z O + ? o Z a v > O Q y N a, N O W 0 (h O w o a) O I c a vt n, y O o N O m U — N W )meq L Z _ 3 3 m a X Q 0= O O O 0°) W o .-- O O O ), ^ Z I- O O O O m O _ _ • 0 O v C� m ea 2 o N Q L C Q O CO ` 0) Z 2 m O O m 01 u > a N N a a 0 o c a ID m m ° Y g 9 2 Q L a m N 03 Q l0 ? + OL .° o0 0 c DZ Q + 2 m 0) Z a a o 0 a C C ■ In t2 r Q E All 1 6g 0 C C.)) C C.)i i)i '� (0 `ten a, C .. N O C 0)▪ C v7 C N O y N (0 i) O C V T 10 O O r O r O W C 2 C N V M L:a n y .. a 5 y (A O N a O. a c °) u m -" o ° :: w m d •o A d m .�' o o m d c 'm c m 13 N I Z 0a. m33o a 202 m u) u. 3 3 a 3 2 0 a > > w O N- O O O co 0000 CO O) O O O O O CO 0000 a 0 4 0 0 0 40 0 0 0 0 S co co O) CD CO CO CO CO m 0 Q) a- rei u o U F o ,o C co a) 7 O Q = co .,- ‘- N :: r nO Im o LD) co —mLD m EN in> —a• am2YQ) N O N O O ZOO O O U Q O 7 O) N N O (0 .-= U R.) 3 d 5 (.4 H 2 W CO CO CO U) N CO 7 N LO co O) CI 7 N O O) N- O W m m O CO c") U) 7 7 6 U) a) W 7 0) 7 7 O) N N ✓ ii O O c- ,- ,- N N N CO CO C 0 C 0 co- cc co co- ccs- co co co ro Q) t a' U) U) U) L() U) CO LO LO CO U) w d N 7 cD O CD CO CD CD CO O LD CD y 2 a M W2OlIHh L O 00 O CP U) 7 m ocD N rm 7 v) N UiO N N M U) I� h ol U) Ln U) U) oU)C N N N N NNt Z' f� f� n 7 N C O W ID U U D) U U D) W O U • 2 Z N 0 0) PO Y 7O O .7r .. UI V7 N LlD ll) U) U) U) If1 'O N + CO Z Q) ID _ -O t 2 2 41.1 t m o c mu) Cl)E 0. aD .- ,- N O CO N- 7 N N a) U O 0 C 0 O in O cn O CO O 7 r E O m W C U) I, O O O > C) > co N- CD CO CD (O 0) 0 U a 0 m w I0 0 Ct.. U) ,- 4 LO LO CA co OD o CO a) 7 N CO CO CO O D) cO c`7 Q) O O w m C W 0) O) O CA (n O) CP A CL CC ..-. CO N N N N N N N N N N a C m U 2 7 H U U7 O 7 U) N C` n CO 7 co 7 N Ln O O CO O CO U) N- CO O n N- L- CO C` x- Of O) O CD 7 Ln t7 C U) LO N (O CO r CO 00 W O O O N 00 CO- CO CO CD W OD Ln T to 0 y O L N _ J 7:1- E E O O c OCO O O) O) O) LD >, t` r N n C` O) O) LD CD O) 0)D cD cD (O CO O Lq 6 6 6 6 l9 U) U) U) U) CO O) O W O O) 4) 'O m m ON C a a d YO m m 'N a 47 O N O O Q °... m 7 3 N O 0 0 b �. E N 0 ca , (NI N CO 7 • U Al0 n M N N N all LO CO0U) U) N N a a N- cO O 7 CD U) COO U) LO Q6 6 0D 60 c0 6 e 0D U) O CO O O M 0", C) N CO CO CO N C) .J A (O C O 0 O CD O 6 N U c0 O g 7 N. O - C. N 0) m v m I— 7 co LD cD O • om a a m N b ✓ a U o o c o 0 O 2 m 0 E p, 0, Z a a 0 0 a ` N O CO O O O Q) O O O O O O O LL) cri 0 0 CO O co O O O O O O O O O O N Z go UI O OO N- r-: OO T I,: O O O) O O U) O O O U. o a. c•-)1 - 7 r W LD O N O O O O O O N U) ` 4- -- U) U) o o N- N- CO O O O t�� c E co' W A 7 rn T d ) a r DS m m o o 0 v ��� c .. H Li = F Y w a Ln of N 41 0 a w v C13 L E d ei - = 7, U o ['� O Q & 0 0 0 7 7 N • Ua0330 Cl) aco , 0 m 0 'C0 U O O h c CO co cc N Z CT_ O oo Z U o a 0 o O o cc a o o E m (o3 w rn m T. com J Q O N U CO O (n .-- E u) 0 N N O 3 C N H W a) u .o c o L a`� y Ct a) c 0 C 'Zi 2) 2 m hi 'O " (c d E c 4 : a w U m O m w K a a) L m a 73 4.3 G , Z 5 J } s Z to O r 0 a u) cc O) aM C W U) H o O O 0 O V T u-i a ) N m O m a) CD O0 O) -: E `o > a a) 2 U o H OY J v u) 0 Q �. CL Q CO O N O O a, O o) 0) ,- u) O co N- CO LOaCO(O y W j y + A C i O O V LO V v) o a V N CO (`] U N O) M O) co 0 J U) rn rn 'TN N- CO rn Z IS N N N N N N + a co LII 7 0 7 N V Q N- CO V N 0 (O Y 5co u L a7 N- O N-NJ- N- g f d th CO m m m m m < > - - m O T C a) Em a — '— 0 0 0 0 0 Q o a d ao 0 0 0 0 0 0 0 o ui ui L L co."- N 3 - g O) 0 N 0 O) N O 0 m O O (a R C 7 V u) u) (O N- 0 Z d d C7 U a d G — °) m rn rn cc 0 at 2 Z il y�j O A 0.en 3 CO �' tW0 T o 1:5 el- 1.11X2 c hi c = 0 a ti o ° < 0 m m I W at _ a O) 0 a) O Z c) a. 3o i 0 co J ■ " - Mal Ie kl� F _ , Q m m w0 - Z E _--._--- 3 U gt, i ' . [7-' Lr53 aqgc. o §jg q E% m O U':3E%. ..--E ` G �..i , rim 9' s m3 filly' Ilk _ G _ L m O Q m Q \ _ U _._.1.-__o c D o^ C7 p m m C7m 4. -, 7 dp - O C,- ^.'tial [h a! 8 o w., p m o = o - = 0 0 0 0 0 0 0 0 - o W 31= n n A n N a m 2 z ‘gPN N g - O Cr• d " (u!/8Sn 0£)(+)4/161W04/noS Ti - o a o eO G d0 '1^ z gA0 p S a s - o 0 > '^88888 •\Y g m •;•i- 3,'4., AT 8`,4": g ....00q '8888 o o0 L2 im 80 "8888 8 a 3a th X 1^ NNN�� w mo oal8� N A L 1,3 328 _ 0 �'*.N 7-':$ - z N� 0�� w RRR RR 13 m �TS �'R�88 ' . a 21 888 0 - FPR3S2(igm o 0 .- 88 a . s N_rme�. m m Zi. m m n a g a _ _ _ ut sn • • a ii ■ l d 1* TI 006,m0955 q£06 3 s s E ac `s - �o g� m a m (.0., m o a \jm J • do tai 3 ia's's,'" e 54il°g _ . 3 ie ma a "1 CO 0 C7 a fs, CI!6 c m 006 m ma `c.16' o "\ oa m§ w z=mom C7 8 m 4� a , `o .2.., ou \ C7 0sc, c CP :902 a` a 'v• n r 3 C7 3 P 1568 I 4 d r N fry iii M o as 0M m ii, M M (m�sn S8)(+)tNoW(-)quicis — — (� 8 f .t ill VI i LilI__ ,mon > m m 0. 1n j Q m j c m 6 a > $ 6 m ch > w th 3 io F Z U' N & o ro in co m of M mEi 7. weooco @ w cQh N g (h Ch T ch ch ch a a a "' , am U'� a t� y oo�SOSo tg p .- b 1 b O o O M M o m 1l m m M m N lel NNN N M — :2Ny ...—""� > ochchchchchchchchchchchchchchchchchchchN (O. 0Ooo0000 .- ,- . NNCv N N N N N . . M M 1 {9 i M " " " OI ,? T m mS��o� Q s ooc.bchchchchchchchchoo hchchchchchcha 5 o 1mn�q`m2 O j 1 1 1 Y 1 i l i i l t ♦ Y l i / / / ag N 9 auS : p ENm,, 0 o (084444 m a G,Z y N q m'-nna ^ 111 �" > " > c� N > e� > g m > > N N > 3$ S$_ r" g g wwg * A0 /190a0 -ro - 5c$7 � � Q� c45 is "NM M 1P11 a LL m N m 0 M a m o N N N N Yg O P9 % a 0 9 0 0 9 0 4 4 0 9 5 O 5 i a 5 oww - W W W LL o o o (7 o c9 o o CI o C9 o (7 c7 ch c9 6 U 8u w�nnv�ww O O m - r n N N N M t+!f O < _N Nl o o m M M 0 0 0 0 0 0 0 0 0 0 0 0 I< E � gS oo. 'g 1LullLLLchchul ul ul u+ chchchu+ ul chchul ul ch ch g :`-n Amt 4$ _ a-;mm 1 1 1 / 1 1 1 1 / 1 1 / ♦ / / 1 1 1 1 Y / 7.1 usvi y llin i s inn' LIo w''<m� s w ;CI W O a a P c 4 v o :77 \ Nm E \ 8y4--° LL O , \ \ 0 a � 0, c 6 fiiVR o 7 O � j 8 E m.5 N nomn C \ a N r C .. s. 14111") ) 000000 J U u) m N d > mm_ U gab mol CO -24 i�' L O Z.22- S Nz N E .. Z :m 1 1‘111111111: ,, ,,,„ : E I - Q (a \\\ N L cv - N N N O N 1 m 1 Tpu BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB G Pad G-01 500292021400 G-01 BPB1 Plan 2 Travelling Cylinder Report 08 July, 2014 //.tlI BP BAKER�HES Travelling Cylinder Report 0 bp irv'rEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-01 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB G Pad MD Reference: 2:01 11/24/1993 00:00 @ 67.85usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: 0-01 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore G-01BPB1 Database: EDM RSK-Alaska PROD-ANCP1 Reference Design: Plan 2 Offset TVD Reference: Offset Datum Reference Plan 2 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Interpolation Method: MD Interval 25.O0usft Error Model: ISCWSA Depth Range: 9,497.81 to 10,025.00usft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,199.22 usft Error Surface: Elliptical Conic Survey Tool Program Date 7/8/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 106.02 8,106.02 1 :Camera based gyro multisho(G-01) CB-GYRO-MS Camera based gyro multishot 8,170.00 9,497.81 2:MWD-Standard(G-01A) MWD MWD-Standard 9,497.81 9,700.00 Plan 2(G-01BPB1) INC+TREND Inclinometer+known azi trend 9,700.00 10,025.00 Plan 2(G-01BPB1) MWD MWD-Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name lin) (in) 10,025.00 9,057.64 2 7/8" 2.875 4.125 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB E Pad E-13-E-13A-E-13A 9,775.00 12,600.00 1,144.79 1,109.06 115.44 Pass-Major Risk E-37-E-37A-E-37A 9,955.89 12,375.00 495.35 501.93 85.19 Pass-Major Risk E-37-E-37APB1-E-37APB1 9,955.89 12,375.00 495.35 502.19 84.94 Pass-Major Risk PB G Pad G-01-G-01-G-01 9,700.00 9,750.00 407.80 311.39 180.57 Pass-Major Risk G-01-G-01A-G-01A 9,549.76 9,550.00 3.13 10.18 -1.00 FAIL-Major Risk G-01-G-018-Plan 3 9,824.89 9,825.00 1.74 0.99 1.16 Pass-Major Risk G-02-G-02-G-02 Out of range G-02-G-02A-G-02A Out of range G-02-G-02B-G-028 Out of range G-05-G-05-G-05 Out of range G-13-G-13-G-13 Out of range G-13-G-13A-G-13A Out of range G-26-G-26-G-26 Out of range G-26-G-26A-G-26A Out of range G-26-G-26B-G-26B Out of range G-30-G-30-G-30 Out of range G-30-G-30A-G-30A Out of range G-30-G-30B-G-30B Out of range G-30-G-30C-G-30C Out of range G-30-G-30CPB1-G-30CPB1 Out of range G-30-G-30D-Plan 7 Out of range G-30-G-30DPB1-Plan 8 Out of range G-31-G-31A-G-31A Out of range G-31-G-31APB1-G-31APB1 Out of range CC-Mw centre to center distance or covergent point.SF-min separation factor,ES-min ellipse separation 7/8/2014 3 09 01 PM Page 2 COMPASS 5000.1 Build 61 1)1 0 toil a 41i !- hi ii, :is, C4 ,- 1 . IX i 11 „ _ ,. a. C ll R 1161 ill , m m Ewm U ��UB I i V V 3 f ,I g m w m O n 6 V i m = I o -4 < rod i 1 ` ' in col 1 I 0. a n • 1. I I J -1'. 5 I III III O III z I o — 6 0 ; '' w Z U i 1 cF I. cr.:: nn ' [r ' 5Q I v d mum ') I L j 1 z3 I ..g III III Z U O ♦ O 1 I ��� U U�1S i W1 011 I III a 1 _1 0S I11 q C m E O cM 1 - if ' O J f 3 .N • I11 ! IH . if! I LLIto 5 • • W g Y 0 awim i r O t " z ' V „ a re ..,:_ .., , ) : < , _.... .. „ H r gm '' Q 1 $� O I °. 1 I U_ I I i 0 m I N O $ 1 r1 MIN CCrc Z o 1 y of 1 cI w 11 v N 111 D MIo u ♦ I a i 111 111111 P,1 CC 1■ P,q -4w _.. I 1i III c I ° n' tO 41;ineem4 lit upp 0 ii , O 1 z OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME: / e4." a 6 ` 8 PTD: 7 /0J3 Development _Service _Exploratory _Stratigraphic Test _Non-Conventional FIELD: g:tez,et...0-e- POOL: C3 ( Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI LATERAL The permit is for a new wellbore segment of existing well Permit (If last two digits No. , API No. 50- - - - in API number are Production should continue to be reported as a function of the original between 60-69) API number stated above. In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pit hole jnust be clearly differentiated in both well name Pilot Hole -0/,5 PH) and API number (50-0Z9- ZvZiy -7v -co) from records, data and logs acquired for well(name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce / inject is contingent upon issuance of a Spacing Exception conservation order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10'sample intervals through target zones. Please note the following special condition of this permit: Production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application,the following well logs are Well Lo inalso required for this well: Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 MC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 4/2014 E Ta0 a) Q a) O co `o ca a z c 2 Q 7 w u) a) a a 0 _ c o c co a T Oo a 3 w'- • _ c m ib n No W ° �' o iso 3 19. �; Q a ai 0. - o, 0 0 4) c 4- 3 ) E o x � @ 0 = 8 as M y 70 -oa) O O c ) c o _ o > n@ o' E o in -Op' N Q. w 'p .• Oco . o ° Z a o °� O) U) 0 w • .-• O' p 0 a)� 31 c S00 . co E m. D a C w C. a). a f. •c. O. CO� a. J a) a) N (U UJ a U) 2 Q,. Q .o O O, 0. a O O, 0' co a• 0' W (O U E O .. m C Q� T o N� ' O. M m. C a) w o O V) _c o 3 0 0 v E N y as a O= co i y CD a V _ 3 c' 0 a v a m 0 0 00 D s �' C is .co — D'et o Ce o m f6 . -aa N N, 3 '9 N t a J a N U a. N N 0 C a� (6,le 0 (O `, d aQ Q a) a) - 0) 0) a) :° �, a a (0 3 Q c 5 3 a) c c _ c m 0 CU ai o - m w cc m m 'v) U) c a) c ° (gyp 7, !2 a, E Uo a) O O c o c0) c.) > r, M .a CO (Nn m' as E. o, 3, 9 Z 3 = 3 U U U N O O O N1 111 1 0 Z C a' Q p. O 7 7 O I— C a N, 1 a, (CO3 w w a O o U u) u) a a Q M 2 1 C? a. a > ; , to • a U) U) CO CO co co co co co co U) U) co 0) U) co U) co co co co co (0 (0 Q a) a) a) a) a) a) a) a) Cl) a) a) a) < < < < Q Q Q Q a) a) a) a) a) Q a) a), a), a), a) a), Q; 0, a) Q. Q Q, a Z >- >- >- >- >- >- >- >- >- >- >- >- Z Z Z Z Z Z Z Z >- >- >- >- >- Z >- >- >- >- >- >- Z, Z, >- Z Z Z I a F Z:3 N a To m a) N13 — E a). O U, U E c a) a) C 3k U) O Qp. ° N 7 a o a ( k a C �; x U o a o co c 3 E 3. 0 a) M 0 U c C' a E. y WO m y v°)i co Q 0 a m; a Q j .0 O N N• U d CO. U U. a) e = 3 O c _J 7' co O`. (a, O• C. .O U)' uJ, co 0 \) 0 '00` a a N ° Q W U. N '00. CO o w� CO' 0 . V1 (p 'O U r otS' U) (6 a) a7 .� .0 0 c. t 0' 3 �7 't' C E' 12, W a >•• 0 E' o' 3 0 c > 'a) N. c O W O 3� O. c. N 0 C > ay N. ► \ '.. } 0) 3 .0 p 3 co U uJ, N n O. — a. 30' CC, R. N. Q U a) 3 a) N N >, w a4i (Ori 0 -0 ° o' a6 E m N' •. o ) -o' O 5 co co ' m Z E -c 0) E Z fo as 3 3 O co C o) .0 c co 3 a .-+ ((•) 7' Q, (/) co a) N o a) a) o m o d' c w - o o E v o a) c a a) a rn m O Q E E = -o c c E co m o M c c' 'u) .0 F .. c o - oa m a c co w - a N�' C a c o o Y a) c m 3 o m 7 O. a 0 - 0 g 0 3 0, > ca ,, N O O C U C CO y O O O C .0-. CO' p U CO C O C 0 Q CO U) V, O. O) .x y N ce• Q o a O c c • c > a o o c CO .-.7•• y Y 7' c a o, Z p . E E _ m ' a) 2 r - m' 3 w a°) c.E a Q m c v «° «° m a a :: w as @ v' E m (° c a)' y co: v,. t co o ar o a 3 a _'' o >, . c E o z0 0 v, v, 'm m v m 3 3 m a) .. o Y 303 0 4 °) up, C m o , a) = m o w U AD. v a) a) m o a) a a0) ate) o co E o c o m o a °c ami `o o ar -0 E 0 co, E _ °) o 0 a ) 0 as F Cl) a -0 Cl) 0 0 L E O` 3 3 a C v 0 U �. O` 0 Y_ 'O a) � a) -p CO' E' a) O U) :_. a C. O. v) C oto Q L O.0 0 E 0 O O O. O a) '.0 a V) (n a' '_ r U O) p- as m (0 0' O CO p' 0 O) • G U 3 N y O' CO E. .c V CC 00 a) C 0 3 a) (p 0 . C C as ` 0) p O U Y U a' 'O O` 0 CO' 73 7. w 0 -p '0� D. �f� U) Q _ 0 c . a a 0 U) >, uJ a a a 3 .0 C a). a) >, Q c. .as =C 0 O' a t, U) U O OU 0 -' T 'O al V 1 a `° a — N N o N C c N Cl)a)) c U •U V V O (o ci _ 3 ? 'O p (o C 0 a) C• ar c, E. X w O m. m (0 o CU CU E m o U _ a); = a) 2 'O; � c O o, U) a' c0i, c '� a) E a) v 3 . a) ° m U m' Cl)�' m' N w w c 3 0 0 0 '- m 0 0 0 .) m 0 (n o o p a) ) o -' v' m. v •(o. r coi o. E' ' , m .c 0 2' S. v. I _ a a) CO 0 0 0 c, > •m •m a ° a) a v 0 > > 3' m o m. o a) w w, Cl) ,� co r E (aa (Eo `�° °: ) J m E m a m m a) 0 a) a) E E c m 3 y c c `C F F F 'w a) tt as m .5. _ a' a p o a a5 m c, m • >-• a) a) c -0 a a 0 0 2 o 0 0 m m m .8 - O. O. t y m. m. a), m. o p �-- U a J 0 �i (o O O a a U Q a z U co U U U o Q '.' Q o m m, U 2 a, 0, co co U, tii ns E 0 N M (f) O W O O N M A (p (O UO O) O N M 0, ([) CO n 00 O) �', N co d' to CO h co O N N N N N N N c`:-, N N M M M M M 1 co M M M M U ° v v v � Cl) N « wNa g- O C N I .2 OpU)0 - O Q N G CV J N N 0 rn I 0 E c--- J It c o ° LU O EE a W a a ; 7) a � U a Q Q w ¢ U Q cn