Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout214-117CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Regg, James B (OGC) To:AOGCC Records (CED sponsored) Subject:FW: NOT OPERABLE: Producer 02-32C (PTD #2141170) Failed CMIT-TxIA Date:Monday, October 3, 2022 2:51:27 PM Jim Regg Supervisor, Inspections AOGCC 333 W. 7th Ave, Suite 100 Anchorage, AK 99501 907-793-1236 From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Sent: Monday, October 3, 2022 2:33 PM To: Regg, James B (OGC) <jim.regg@alaska.gov> Cc: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Bo York <byork@hilcorp.com> Subject: NOT OPERABLE: Producer 02-32C (PTD #2141170) Failed CMIT-TxIA Mr. Regg, Slickline set DGLVs on 09/19/22 but the well failed another TIFL on 09/20/22. On 10/02/22 Slickline set a TTP and performed a passing MIT-T to 2555 psi, but a subsequent CMIT-TxIA failed. The failed CMIT-TxIA indicates a failure of one or more well barriers and the well is now classified as NOT OPERABLE and will remain secured with the TTP while the OE evaluates repair options. Please respond with any questions. Andy Ogg Hilcorp Alaska LLC Field Well Integrity andrew.ogg@hilcorp.com P: (907) 659-5102 M: (307)399-3816 From: PB Wells Integrity Sent: Sunday, September 18, 2022 8:39 AM To: jim.regg@alaska.gov Cc: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Bo York <byork@hilcorp.com> Subject: UNDER EVALUATION: Producer 02-32C (PTD #214117) Failed TIFL Sustained casing pressure IA Mr. Regg, Producer 02-32C (PTD #214117) was reported to have TxIA communication after operator pressure bleeds. Subsequent warm TIFL failed on 09/15/22 which confirms TxIA pressure communication. IA pressure exceeded NOL ~2130 psi on 09/18/22. At this time, the well is classified as UNDER EVALUATION and on a 28 day clock to be resolved. Plan forward 1. Slickline: Set DGLV 2. Downhole Diagnostics: TIFL 3. Well Integrity: Further action as required. Please call with any questions or concerns. Ryan Holt Hilcorp Alaska LLC Field Well Integrity / Compliance Ryan.Holt@Hilcorp.com P: (907) 659-5102 M: (907) 232-1005 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. RECEIVED 2555 Z APR 0 8 2015 Letter of Transmittal AOGCC BAKER Date: April 8, 2015 HUGHES To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7th Ave. Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Paula Lacey Paula.Lacey@bakerhughes.com r Please find enclosed the TVDSS/MWD data for the following well(s): 02-32CPB1 Enclosed for each well(s): 2 hardcopy prints of TVDSS/MWD Final Logs 1 compact disk containing TVDSS/MWD Final Field Data Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. SOWED APR 0 D2015 Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: , State of Alaska AOGCC DATE: 214127 Letter of Transmittal MkIII (7 25620) BAKER Date: March 30, 2015 1o a LOGGED 1:K''EgRHUGHES To: 1 From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage,Alaska 99501 Anchorage,Alaska 99515 Paula Lacey paula.lacey@bakerhughes.com Please find enclosed the final directional survey data for the following well(s): 02-32CPB1, 02-32C Enclosed for each well(s): 2 hardcopy prints of final directional survey reports 1 compact disc of final directional survey reports° Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. COJ l ''° Petrotechnical Data Center, LR2-1 P011 ratS 900 E. Benson Blvd. &CG Anchorage, Alaska 99508 Ptv to acknowledge receipt of this data. RECEIVED BY: " 0-, 6-esteevt, State of Alaska AOGCC 41) DATE: r • Z 1 4 1 1 7 fl b 6 2 OECEq D APR 02 2015 P . 40Gcc .,.,.,.. ,, ^'''',4,444144,4444.4„ 1 :4,i,,s1,44:11,?,:lit,1111,5,6'!III 444,4,4"'W4,44,4!'4,44# t 4444,4444,41,44,,,, '4,4,4,444 4,4'4 (4;44,4%.4,44„44 `444,44,444 4,4 North America - ALASKA - BP Prudhoe Bay t '444'5.4 444,4a4 PB DS 02 02-32 ,r 500292220900 44 44,74.44444 4 02-32CPBI ,4.44,4444,4444 ,44,44444444,44.44' '4444444 4.4.444 44,44,444,444,44'‘ Design: 02-32CPBI litthAAA,,,,t, tlit -Nvx740..,z- wA.41.07,4v, Survey Report - Geographic Geographic ...,...„.„,..,... 25 November, 2014 , ,,...,..,..,,....,,...,...„., . ,41),S,";.W.A..,,,,e9z.,,.• 44 44 44,.444. . 4,444,444,4444 4,,'4 44.414,44',44'4,441.4, 44,4'4,44-44,444 . .444444;4,44,44.44'41, 44,44.4 4,4 44, . 10,44,4444,4.4 . 4,44,V14,44444314; 4144444,44,444,444; '4.444,.4,4,44,44,4 k.0,4,'4,441,44,0,;44 ' ,44094,4,444,44-444. V42.1,1e0,4,4*, BAKER ii,::„.,,,,,,,,,,E,,:,,,,:,,„:,..:':::,..*:,,,,..,,,,,,,,.',,,',.,..:',,,,,,::',,,,,,,,,,,,,,,,,,,::;,:‘,,,,:,,,,,,,,,,,,,,,,,,„,„'::,,,:::',,,;‘,:,,,,,,,,,,,,,,,,,'',:,,,,,,,,,,,,,,,,,,,,,5,;::-:,,,,,,„..,,,,,,,,,',..4:;,:.,,,,,,,,,''',,,,,,,'',,,,' HUGHES .......4. . Er 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-328:) Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Well: 02-32 North Reference: True Wellbore: 02-32CP01 Survey Calculation Method: Minimum Curvature Design: 02-32CPB1 Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 02,TR-11-14 Site Position: Northing: 5,948,800.37 usft Latitude: 70°15'53.847 N From: Map Easting: 687,638.44 usft Longitude: 148°28'58.06 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.43 ° Well 02-32 API No. 500292220900 Well Position +N/-S 0.00 usft Northing: 5,951,220.20 usft Latitude: 70°16'17.683 N +El-W 0.00 usft Easting: 687,466.07 usft Longitude: 148°29'1.32 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 30.60 usft Wellbore 02-32CPB1 API no. 500292220973 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2014 10/24/2014 19-68 81.01 57,601 J i Design 02-32CPB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,231.72 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (°) 26.00 0.00 0.00 38.23 Survey Program Date: 11/25/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 187.60 6,564.60 1 :MWD-Standard(02-32) MWD MWD-Standard 6,621.00 9,231.72 2-32B IFR(02-328) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 9,257.00 9,330.18 Inc+Trend(02-32CP81) INC+TREND Inclinometer+known azi trend 9,350.06 10,956.16 MWD(02-32CPB1) MWD MWD-Standard 11/25/2014 9:26:14AM Page 2 COMPASS 5000.1 Build 61 INS 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B:) Site: PB DS 02 MD Reference: 2-328:@ 56.60usft(2-32B:) Well: 02-32 North Reference: True Wellbore: 02-32CPB1 Survey Calculation Method: Minimum Curvature Design: 02-32CPB1 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N1-S +Ei-W Northing Easting (usft) (0) (0) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,231.72 67.11 351.54 8,834.48 1,226.11 -310.87 5,952,438.11 687,124.77 70°16'29.741 N 148°29'10.37 W TIP 9,257.00 67.88 352.20 8,844.16 1,249.23 -314.18 5,952,461.14 687,120.90 70°16'29.969 N 148°29'10.47 W KOP 9,277.93 69.26 354.89 8,851.81 1,268.58 -316.36 5,952,480.43 687,118.23 70°16'30.159 N 148°29'10.53 W Interpolated Azimuth 9,303.80 72.74 358.09 8,860.23 1,292.99 -317.85 5,952,504.80 687,116.13 70°16'30.399 N 148°29'10.58 W Interpolated Azimuth 9,330.18 77.43 1.24 8,867.02 1,318.47 -317.99 5,952,530.26 687,115.35 70°16'30.650 N 148°29'10.58 W Interpolated Azimuth 9,350.06 80.75 3.56 8,870.78 1,337.97 -317.17 5,952,549.78 687,115.69 70°16'30.842 N 148°29'10.56 W 9,383.01 80.90 4.28 8,876.03 1,370.42 -314.95 5,952,582.27 687,117.10 70°16'31.161 N 148°29'10.49 W 9,410.24 81.46 9.34 8,880.21 1,397.13 -311.76 5,952,609.05 687,119.63 70°16'31.423 N 148°29'10.40 W 9,434.44 81.95 12.99 8,883.70 1,420.62 -307.12 5,952,632.65 687,123.67 70°16'31.654 N 148°29'10.26 W 9,470.41 81.70 18.90 8,888.82 1,454.84 -297.35 5,952,667.10 687,132.59 70°16'31.991 N 148°29'9.98 W 9,500.16 81.37 23.25 8,893.21 1,482.29 -286.77 5,952,694.80 687,142.49 70°16'32.261 N 148°29'9.67 W 9,530.08 82.15 27.52 8,897.50 1,509.04 -274.08 5,952,721.85 687,154.51 70°16'32.524 N 148°29'9.30 W 9,561.64 84.50 33.13 8,901.17 1,536.08 -258.26 5,952,749.28 687,169.65 70°16'32.790 N 148°29'8.84 W 9,590.11 85.67 38.50 8,903.61 1,559.07 -241.66 5,952,772.67 687,185.66 70°16'33.016 N 148°29'8.36 W 9,620.05 85.88 44.06 8,905.81 1,581.50 -221.97 5,952,795.59 687,204.79 70°16'33.237 N 148°29'7.78 W 9,650.51 87.33 49.89 8,907.62 1,602.24 -199.75 5,952,816.87 687,226.48 70°16'33.441 N 148°29'7.14 W 9,680.50 88.00 54.76 8,908.84 1,620.55 -176.04 5,952,835.76 687,249.73 70°16'33.621 N 148°29'6.45 W 9,710.40 89.66 60.19 8,909.45 1,636.61 -150.85 5,952,852.45 687,274.51 70°16'33.779 N 148°29'5.71 W 9,740.57 88.71 67.25 8,909.88 1,649.96 -123.82 5,952,866.46 687,301.20 70°16'33.910 N 148°29'4.93 W 9,770.78 88.53 72.93 8,910.61 1,660.24 -95.43 5,952,877.45 687,329.32 70°16'34.011 N 148°29'4.10 W 9,800.48 88.77 78.78 8,911.31 1,667.49 -66.65 5,952,885.41 687,357.91 70°16'34.083 N 148°29'3.26 W 9,830.48 87.76 86.40 8,912.22 1,671.36 -36.94 5,952,890.02 687,387.51 70°16'34.121 N 148°29'2.40 W 9,860.54 88.25 92.48 8,913.27 1,671.65 -6.91 5,952,891.06 687,417.52 70°16'34.123 N 148°29'1.52 W 9,905.53 86.71 99.93 8,915.25 1,666.80 37.74 5,952,887.32 687,462.28 70°16'34.076 N 148°29'0.22 W 9,921.64 86.90 103.44 8,916.15 1,663.54 53.49 5,952,884.46 687,478.10 70°16'34.044 N 148°28'59.76 W 9,954.53 88.80 110.15 8,917.38 1,654.05 84.93 5,952,875.75 687,509.77 70°16'33.950 N 148°28'58.85 W 9,982.69 89.79 116.35 8,917.73 1,642.94 110.79 5,952,865.29 687,535.90 70°16'33.841 N 148°28'58.09 W 10,000.53 88.28 117.93 8,918.03 1,634.80 126.66 5,952,857.55 687,551.97 70°16'33.761 N 148°28'57.63 W 10,025.53 88.31 114.72 8,918.77 1,623.72 149.06 5,952,847.03 687,574.63 70°16'33.652 N 148°28'56.98 W 10,057.79 87.85 111.06 8,919.86 1,611.18 178.76 5,952,835.24 687,604.63 70°16'33.529 N 148°28'56.12 W 10,095.44 87.73 110.55 8,921.31 1,597.82 213.92 5,952,822.76 687,640.12 70°16'33.397 N 148°28'55.09 W 10,125.51 88.19 114.93 8,922.38 1,586.21 241.63 5,952,811.84 687,668.10 70°16'33.283 N 148°28'54.28 W 10,155.40 89.60 120.92 8,922.96 1,572.22 268.02 5,952,798.51 687,694.83 70°16'33.145 N 148°28'53.52 W 10,185.42 87.32 124.32 8,923.76 1,556.05 293.29 5,952,782.97 687,720.50 70°16'32.986 N 148°28'52.78 W 10,215.79 86.62 128.66 8,925.37 1,538.01 317.67 5,952,765.56 687,745.31 70°16'32.809 N 148°28'52.07 W 10,245.62 87.36 132.97 8,926.94 1,518.55 340.21 5,952,746.66 687,768.33 70°16'32.618 N 148°28'51.41 W 10,275.71 90.12 135.30 8,927.60 1,497.60 361.80 5,952,726.26 687,790.43 70°16'32.412 N 148°28'50.79 W 10,301.35 88.74 137.18 8,927.85 1,479.09 379.53 5,952,708.19 687,808.62 70°16'32.229 N 148°28'50.27 W 10,336.20 88.53 131.52 8,928.68 1,454.74 404.43 5,952,684.48 687,834.12 70°16'31.990 N 148°28'49.54 W 10,366.11 89.79 127.20 8,929.12 1,435.78 427.55 5,952,666.10 687,857.70 70°16'31.804 N 148°28'48.87 W 10,395.73 90.49 126.46 8,929.05 1,418.03 451.26 5,952,648.94 687,881.84 70°16'31.629 N 148°28'48.18 W 10,425.90 91.04 130.25 8,928.65 1,399.31 474.91 5,952,630.82 687,905.95 70°16'31.445 N 148°28'47.49 W 10,452.32 90.71 133.28 8,928.24 1,381.72 494.61 5,952,613.72 687,926.08 70°16'31.272 N 148°28'46.92 W 10,480.65 90.18 136.73 8,928.02 1,361.69 514.64 5,952,594.20 687,946.60 70°16'31.075 N 148°28'46.34 W 10,510.64 87.85 140.24 8,928.54 1,339.24 534.51 5,952,572.26 687,967.02 70°16'30.854 N 148°28'45.76 W 10,540.78 87.08 144.14 8,929.87 1,315.45 552.96 5,952,548.94 687,986.06 70°16'30.620 N 148°28'45.22 W 10,570.27 87.73 148.29 8,931.21 1,290.98 569.34 5,952,524.88 688,003.05 70°16'30.379 N 148°28'44.74 W 10,600.80 86.96 152.90 8,932.62 1,264.41 584.31 5,952,498.70 688,018.67 70°16'30.118 N 148°28'44.31 W 10,630.99 89.20 158.71 8,933.64 1,236.91 596.67 5,952,471.51 688,031.71 70°16'29.847 N 148°28'43.95 W 11/25/2014 9:26:14AM Page 3 COMPASS 5000.1 Build 61 r =0..0_ I nk bp Survey Report-Geographic BAKER 5.004 HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B:) Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Well: 02-32 North Reference: True Wellbore: 02-32CPB1 Survey Calculation Method: Minimum Curvature Design: 02-32CPB1 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +w-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 10,660.78 87.57 163.54 8,934.48 1,208.74 606.30 5,952,443.59 688,042.04 70°16'29.570 N 148°28'43.67 W 10,690.41 88.31 168.37 8,935.54 1,180.02 613.49 5,952,415.06 688,049.94 70°16'29.288 N 148°28'43.46 W 10,720.78 87.42 173.01 8,936.67 1,150.08 618.39 5,952,385.26 688,055.59 70°16'28.994 N 148°28'43.32 W 10,753.44 85.54 175.51 8,938.68 1,117.65 621.65 5,952,352.92 688,059.66 70°16'28.675 N 148°28'43.22 W 10,780.78 83.75 172.38 8,941.23 1,090.58 624.52 5,952,325.94 688,063.20 70°16'28.408 N 148°28'43.14 W 10,810.88 83.29 167.71 8,944.63 1,061.14 629.69 5,952,296.63 688,069.10 70°16'28.119 N 148°28'42.99 W 10,840.32 83.75 163.93 8,947.95 1,032.78 636.86 5,952,268.46 688,076.97 70°16'27.840 N 148°28'42.78 W 10,870.08 83.54 159.30 8,951.25 1,004.72 646.18 5,952,240.64 688,086.99 70°16'27.564 N 148°28'42.51 W 10,900.18 80.72 159.06 8,955.37 976.85 656.78 5,952,213.05 688,098.27 70°16'27.290 N 148°28'42.20 W 10,930.01 76.91 158.75 8,961.16 949.56 667.31 5,952,186.03 688,109.48 70°16'27.021 N 148°28'41.89 W 10,956.16 73.47 159.31 8,967.84 925.95 676.36 5,952,162.66 688,119.11 70°16'26.789 N 148°28'41.63 W 11,007.00 73.47 159.31 8,982.30 880.36 693.58 5,952,117.51 688,137.46 70°16'26.341 N 148°28'41.13 W Projection to TD 11/25/2014 9:26:14AM Page 4 COMPASS 5000.1 Build 61 122 5 6 2 0 .* ECEIVEV APR 0 2 2015 bp AOGCC .,•, North America - ALASKA - BP Prudhoe Bay PB DS 02 02-32 500292220900 02-32CPB1 Design: 02-32CPB1 Survey Report - Geographic 25 November, 2014 BAKER HUGHES e F'r- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B:) Site: PB DS 02 MD Reference: 2-328:@ 56.60usft(2-32B:) Well: 02-32 North Reference: True Wellbore: 02-32CPB1 Survey Calculation Method: Minimum Curvature Design: 02-32CPB1 Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 02,TR-11-14 Site Position: Northing: 5,948,800.37 usft Latitude: 70°15'53.847 N From: Map Easting: 687,638.44 usft Longitude: 148°28'58.06 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.43° Well 02-32 API No. 500292220900 Well Position +NI-S 0.00 usft Northing: 5,951,220.20 usft Latitude: 70°16'17.683 N +E/-W 0.00 usft Easting: 687,466.07 usft Longitude: 148°29'1.32 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 30.60 usft Wellbore 02-32CPB1 API no. 500292220973 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2014 10/24/2014 19 68 81.01 57.601 Design 02-32CPB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9 231 72 Vertical Section: Depth From(TVD) +N/-S +EI-W Direction (usft) (usft) (usft) (°) 26 00 0.00 0 00 38.23 Survey Program Date: 11/25/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 187.60 6,564.60 1 :MWD-Standard(02-32) MWD MWD-Standard 6,621.00 9,231 72 2-32B IFR(02-32B) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 9,257.00 9,330.18 Inc+Trend(02-32CPB1) INC+TREND Inclinometer+known azi trend 9,350.06 10,956.16 MWD(02-32CPB1) MWD MWD-Standard 11/25/2014 9:26:14AM Page 2 COMPASS 5000.1 Build 61 1/1 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B:) Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Well: 02-32 North Reference: True Wellbore: 02-32CPB1 Survey Calculation Method: Minimum Curvature Design: 02-32CPB1 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/•W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,231.72 67.11 351.54 8,834.48 1,226.11 -310.87 5,952,438.11 687,124.77 70°16'29.741 N 148°29'10.37 W T1P 9,257.00 67.88 352.20 8,844.16 1,249.23 -314.18 5,952,461.14 687,120.90 70°16'29.969 N 148°29'10.47 W KOP 9,277.93 69.26 354.89 8,851.81 1,268.58 -316.36 5,952,480.43 687,118.23 70°16'30.159 N 148°29'10.53 W Interpolated Azimuth 9,303.80 72.74 358.09 8,860.23 1,292.99 -317.85 5,952,504.80 687,116.13 70°16'30.399 N 148°29'10.58 W Interpolated Azimuth 9,330.18 77.43 1.24 8,867.02 1,318.47 -317.99 5,952,530.26 687,115.35 70°16'30.650 N 148°29'10.58 W Interpolated Azimuth 9,350.06 80.75 3.56 8,870.78 1,337.97 -317.17 5,952,549.78 687,115.69 70°16'30.842 N 148°29'10.56 W 9,383.01 80.90 4.28 8,876.03 1,370.42 -314.95 5,952,582.27 687,117.10 70°16'31.161 N 148°29'10.49 W 9,410.24 81.46 9.34 8,880.21 1,397.13 -311.76 5,952,609.05 687,119.63 70°16'31.423 N 148°29'10.40 W 9,434.44 81.95 12.99 8,883.70 1,420.62 -307.12 5,952,632.65 687,123.67 70°16'31.654 N 148°29'10.26 W 9,470.41 81.70 18.90 8,888.82 1,454.84 -297.35 5,952,667.10 687,132.59 70°16'31.991 N 148°29'9.98 W 9,500.16 81.37 23.25 8,893.21 1,482.29 -286.77 5,952,694.80 687,142.49 70°16'32.261 N 148°29'9.67 W 9,530.08 82.15 27.52 8,897.50 1,509.04 -274.08 5,952,721.85 687,154.51 70°16'32.524 N 148°29'9.30 W 9,561.64 84.50 33.13 8,901.17 1,536.08 -258.26 5,952,749.28 687,169.65 70°16'32.790 N 148°29'8.84 W 9,590.11 85.67 38.50 8,903.61 1,559.07 -241.66 5,952,772.67 687,185.66 70°16'33.016 N 148°29'8.36 W 9,620.05 85.88 44.06 8,905.81 1,581.50 -221.97 5,952,795.59 687,204.79 70°16'33.237 N 148°29'7.78 W 9,650.51 87.33 49.89 8,907.62 1,602.24 -199.75 5,952,816.87 687,226.48 70°16'33.441 N 148°29'7.14 W 9,680.50 88.00 54.76 8,908.84 1,620.55 -176.04 5,952,835.76 687,249.73 70°16'33.621 N 148°29'6.45 W 9,710.40 89.66 60.19 8,909.45 1,636.61 -150.85 5,952,852.45 687,274.51 70°16'33.779 N 148°29'5.71 W 9,740.57 88.71 67.25 8,909.88 1,649.96 -123.82 5,952,866.46 687,301.20 70°16'33.910 N 148°29'4.93 W 9,770.78 88.53 72.93 8,910.61 1,660.24 -95.43 5,952,877.45 687,329.32 70°16'34.011 N 148°29'4.10 W 9,800.48 88.77 78.78 8,911.31 1,667.49 -66.65 5,952,885.41 687,357.91 70°16'34.083 N 148°29'3.26 W 9,830.48 87.76 86.40 8,912.22 1,671.36 -36.94 5,952,890.02 687,387.51 70°16'34.121 N 148°29'2.40 W 9,860.54 88.25 92.48 8,913.27 1,671.65 -6.91 5,952,891.06 687,417.52 70°16'34.123 N 148°29'1.52 W 9,905.53 86.71 99.93 8,915.25 1,666.80 37.74 5,952,887.32 687,462.28 70°16'34.076 N 148°29'0.22 W 9,921.64 86.90 103.44 8,916.15 1,663.54 53.49 5,952,884.46 687,478.10 70°16'34.044 N 148°28'59.76 W 9,954.53 88.80 110.15 8,917.38 1,654.05 84.93 5,952,875.75 687,509.77 70°16'33.950 N 148°28'58.85 W 9,982.69 89.79 116.35 8,917.73 1,642.94 110.79 5,952,865.29 687,535.90 70°16'33.841 N 148°28'58.09 W 10,000.53 88.28 117.93 8,918.03 1,634.80 126.66 5,952,857.55 687,551.97 70°16'33.761 N 148°28'57.63 W 10,025.53 88.31 114.72 8,918.77 1,623.72 149.06 5,952,847.03 687,574.63 70°16'33.652 N 148°28'56.98 W 10,057.79 87.85 111.06 8,919.86 1,611.18 178.76 5,952,835.24 687,604.63 70°16'33.529 N 148°28'56.12 W 10,095.44 87.73 110.55 8,921.31 1,597.82 213.92 5,952,822.76 687,640.12 70°16'33.397 N 148°28'55.09 W 10,125.51 88.19 114.93 8,922.38 1,586.21 241.63 5,952,811.84 687,668.10 70°16'33.283 N 148°28'54.28 W 10,155.40 89.60 120.92 8,922.96 1,572.22 268.02 5,952,798.51 687,694.83 70°16'33.145 N 148°28'53.52 W 10,185.42 87.32 124.32 8,923.76 1,556.05 293.29 5,952,782.97 687,720.50 70°16'32.986 N 148°28'52.78 W 10,215.79 86.62 128.66 8,925.37 1,538.01 317.67 5,952,765.56 687,745.31 70°16'32.809 N 148°28'52.07 W 10,245.62 87.36 132.97 8,926.94 1,518.55 340.21 5,952,746.66 687,768.33 70°16'32.618 N 148°28'51.41 W 10,275.71 90.12 135.30 8,927.60 1,497.60 361.80 5,952,726.26 687,790.43 70°16'32.412 N 148°28'50.79 W 10,301.35 88.74 137.18 8,927.85 1,479.09 379.53 5,952,708.19 687,808.62 70°16'32.229 N 148°28'50.27 W 10,336.20 88.53 131.52 8,928.68 1,454.74 404.43 5,952,684.48 687,834.12 70°16'31.990 N 148°28'49.54 W 10,366.11 89.79 127.20 8,929.12 1,435.78 427.55 5,952,666.10 687,857.70 70°16'31.804 N 148°28'48.87 W 10,395.73 90.49 126.46 8,929.05 1,418.03 451.26 5,952,648.94 687,881.84 70°16'31.629 N 148°28'48.18 W 10,425.90 91.04 130.25 8,928.65 1,399.31 474.91 5,952,630.82 687,905.95 70°16'31.445 N 148°28'47.49 W 10,452.32 90.71 133.28 8,928.24 1,381.72 494.61 5,952,613.72 687,926.08 70°16'31.272 N 148°28'46.92 W 10,480.65 90.18 136.73 8,928.02 1,361.69 514.64 5,952,594.20 687,946.60 70°16'31.075 N 148°28'46.34 W 10,510.64 87.85 140.24 8,928.54 1,339.24 534.51 5,952,572.26 687,967.02 70°16'30.854 N 148°28'45.76 W 10,540.78 87.08 144.14 8,929.87 1,315.45 552.96 5,952,548.94 687,986.06 70°16'30.620 N 148°28'45.22 W 10,570.27 87.73 148.29 8,931.21 1,290.98 569.34 5,952,524.88 688,003.05 70°16'30.379 N 148°28'44.74 W 10,600.80 86.96 152.90 8,932.62 1,264.41 584.31 5,952,498.70 688,018.67 70°16'30.118 N 148°28'44.31 W 10,630.99 89.20 158.71 8,933.64 1,236.91 596.67 5,952,471.51 688,031.71 70°16'29.847 N 148°28'43.95 W 11/25/2014 9:26:14AM Page 3 COMPASS 5000.1 Build 61 Z IP by Survey Report-Geographic BAKER °' HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B:) Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Well: 02-32 North Reference: True Wellbore: 02-32CPB1 Survey Calculation Method: Minimum Curvature Design: 02-32CPB1 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting . (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 10,660.78 87.57 163.54 8,934.48 1,208.74 606.30 5,952,443.59 688,042.04 70°16'29.570 N 148°28'43.67 W 10,690.41 88.31 168.37 8,935.54 1,180.02 613.49 5,952,415.06 688,049.94 70°16'29.288 N 148°28'43.46 W 10,720.78 87.42 173.01 8,936.67 1,150.08 618.39 5,952,385.26 688,055.59 70°16'28.994 N 148°28'43.32 W 10,753.44 85.54 175.51 8,938.68 1,117.65 621.65 5,952,352.92 688,059.66 70°16'28.675 N 148°28'43.22 W 10,780.78 83.75 172.38 8,941.23 1,090.58 624.52 5,952,325.94 688,063.20 70°16'28.408 N 148°28'43.14 W 10,810.88 83.29 167.71 8,944.63 1,061.14 629.69 5,952,296.63 688,069.10 70°16'28.119 N 148°28'42.99 W 10,840.32 83.75 163.93 8,947.95 1,032.78 636.86 5,952,268.46 688,076.97 70°16'27.840 N 148°28'42.78 W 10,870.08 83.54 159.30 8,951.25 1,004.72 646.18 5,952,240.64 688,086.99 70°16'27.564 N 148°28'42.51 W 10,900.18 80.72 159.06 8,955.37 976.85 656.78 5,952,213.05 688,098.27 70°16'27.290 N 148°28'42.20 W 10,930.01 76.91 158.75 8,961.16 949.56 667.31 5,952,186.03 688,109.48 70°16'27.021 N 148°28'41.89 W 10,956.16 73.47 159.31 8,967.84 925.95 676.36 5,952,162.66 688,119.11 70°16'26.789 N 148°28'41.63 W 11,007.00 73.47 159.31 8,982.30 880.36 693.58 5,952,117.51 688,137.46 70°16'26.341 N 148°28'41.13 W Projection to TD 11/25/2014 9:26:14AM Page 4 COMPASS 5000.1 Build 61 21 41 17 5619 Letter of Transmittal Fait" 25620 BAKER Date: DATA LOGGED March 30, 2015 K/3a2O1IR HUGHES M K.BEND To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Paula Lacey paula.lacey@bakerhughes.corn Please find enclosed the final directional survey data for the following well(s): 02-32CPB1, 02-32C Enclosed for each well(s): 2 hardcopy prints of final directional survey reports 1 compact disc of final directional survey reports° Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. fteG Petrotechnical Data Center, LR2-1 P 0 2 Zbo 900 E. Benson Blvd. NOG,GG Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: / ` / i 6.eiteat, State of Alaska AOGCC DATE: 21 25619 b RECEIVER p APR 02 2015 Ar)(Inn North America - ALASKA - BP Prudhoe Bay PB DS 02 02-32 500292220900 02-32C Design: 02-32C Survey Report - Geographic 05 November, 2014 NMI BAKER HUGHES red- 0 by Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B:) Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Well: 02-32 North Reference: True Wellbore: 02-32C Survey Calculation Method: Minimum Curvature Design: 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 02,TR-11-14 Site Position: Northing: 5,948,800.37 usft Latitude: 70°15'53.847 N From: Map Easting: 687,638.44 usft Longitude: 148°28'58.06 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.43° Well 02-32 API No. 500292220900 Well Position +N/-S 0.00 usft Northing: 5,951,220.20 usft Latitude: 70°16'17.683 N +E/-W 0.00 usft Easting: 687,466.07 usft Longitude: 148°29'1.32 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 30.60 usft Wellbore 02-32C API no. 500292220903 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2014 10/24/2014 19.68 81.01 57,601 Design 02-32C Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,009.14 Vertical Section: Depth From(ND) +N/-S +El-W Direction (usft) (usft) (usft) (°) 26.00 0.00 0.00 94.64 Survey Program Date: 11/5/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 187.60 6,564.60 1 :MWD-Standard(02-32) MWD MWD-Standard 6,621.00 9,009.14 2-32B IFR(02-32B) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 9,041.00 9,160.49 Inc+Trend(02-32C) INC+TREND Inclinometer+known azi trend 9,191.74 11,836.26 MWD(02-32C) MWD MWD-Standard 11/5/2014 2:18:32PM Page 2 COMPASS 5000.1 Build 61 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVO Reference: 2-32B:@ 56.60usft(2-32B:) Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Well: 02-32 North Reference: True Wellbore: 02-32C Survey Calculation Method: Minimum Curvature Design: 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,009.14 51.44 352.24 8,721.13 1,037.28 -284.27 5,952,250.01 687,156.07 70°16'27.884 N 148°29'9.60 W TIP 9,041.00 53.46 351.69 8,740.55 1,062.29 -287.80 5,952,274.92 687,151.92 70°16'28.130 N 148°29'9.70 W KOP 9,070.35 57.33 351.59 8,757.21 1,086.18 -291.31 5,952,298.72 687,147.81 70°16'28.365 N 148°29'9.80 W Interpolated Azimuth 9,100.32 62.75 351.48 8,772.18 1,111.86 -295.13 5,952,324.29 687,143.35 70°16'28.618 N 148°29'9.91 W Interpolated Azimuth 9,130.32 68.92 351.39 8,784.45 1,138.91 -299.21 5,952,351.23 687,138.61 70°16'28.884 N 148°29'10.03 W Interpolated Azimuth 9,160.49 75.87 351.29 8,793.57 1,167.32 -303.53 5,952,379.53 687,133.57 70°16'29.163 N 148°29'10.16 W Interpolated Azimuth 9,191.74 82.19 351.21 8,799.51 1,197.63 -308.20 5,952,409.71 687,128.16 70°16'29.461 N 148°29'10.29 W 9,220.46 89.39 352.52 8,801.62 1,225.96 -312.25 5,952,437.93 687,123.40 70°16'29.740 N 148°29'10.41 W 9,250.43 92.42 359.10 8,801.15 1,255.83 -314.44 5,952,467.73 687,120.47 70°16'30.034 N 148°29'10.48 W 9,281.95 90.46 2.56 8,800.36 1,287.33 -313.98 5,952,499.23 687,120.14 70°16'30.344 N 148°29'10.46 W 9,310.56 90.09 9.26 8,800.22 1,315.77 -311.03 5,952,527.73 687,122.38 70°16'30.623 N 148°29'10.38 W 9,341.20 91.23 16.85 8,799.86 1,345.59 -304.12 5,952,557.72 687,128.55 70°16'30.917 N 148°29'10.18 W 9,370.65 89.05 24.13 8,799.79 1,373.16 -293.82 5,952,585.53 687,138.16 70°16'31.188 N 148°29'9.88 W 9,402.86 91.66 31.30 8,799.59 1,401.65 -278.85 5,952,614.39 687,152.41 70°16'31.468 N 148°29'9.44 W I 9,430.35 90.95 36.87 8,798.97 1,424.41 -263.45 5,952,637.52 687,167.23 70°16'31.692 N 148°29'8.99 W 9,460.15 89.82 42.52 8,798.77 1,447.32 -244.43 5,952,660.90 687,185.68 70°16'31.917 N 148°29'8.44 W 9,484.89 89.72 48.73 8,798.86 1,464.62 -226.75 5,952,678.63 687,202.92 70°16'32.087 N 148°29'7.92 W 9,514.90 92.18 51.89 8,798.37 1,483.78 -203.67 5,952,698.35 687,225.52 70°16'32.276 N 148°29'7.25 W 9,544.80 89.14 54.47 8,798.02 1,501.69 -179.74 5,952,716.86 687,248.99 70°16'32.452 N 148°29'6.55 W 9,570.07 89.39 56.79 8,798.35 1,515.95 -158.88 5,952,731.64 687,269.48 70°16'32.592 N 148°29'5.95 W 9,600.05 88.65 59.93 8,798.86 1,531.68 -133.37 5,952,747.99 687,294.60 70°16'32.747 N 148°29'5.20 W 9,630.76 87.05 62.92 8,800.01 1,546.35 -106.42 5,952,763.33 687,321.17 70°16'32.891 N 148°29'4.42 W 9,660.47 88.56 67.37 8,801.15 1,558.83 -79.49 5,952,776.47 687,347.78 70°16'33.014 N 148°29'3.64 W 9,690.58 89.26 71.95 8,801.72 1,569.29 -51.27 5,952,787.63 687,375.73 70°16'33.117 N 148°29'2.81 W 9,720.69 89.48 77.01 8,802.05 1,577.34 -22.27 5,952,796.40 687,404.52 70°16'33.196 N 148°29'1.97 W 9,750.58 88.59 82.54 8,802.56 1,582.65 7.13 5,952,802.44 687,433.78 70°16'33.248 N 148°29'1.11 W 9,780.61 88.19 87.03 8,803.40 1,585.37 37.02 5,952,805.91 687,463.58 70°16'33.275 N 148°29'0.24 W 9,810.57 88.46 92.82 8,804.28 1,585.41 66.95 5,952,806.69 687,493.51 70°16'33.275 N 148°28'59.37 W 9,840.64 88.53 98.30 .8,805.07 1,582.50 96.86 5,952,804.53 687,523.47 70°16'33.247 N 148°28'58.50 W 9,870.76 88.65 103.37 8,805.81 1,576.84 126.42 5,952,799.61 687,553.17 70°16'33.191 N 148°28'57.64 W 9,900.97 88.50 108.82 8,806.56 1,568.47 155.43 5,952,791.96 687,582.37 70°16'33.109 N 148°28'56.80 W 9,930.74 88.25 114.35 8,807.41 1,557.53 183.09 5,952,781.71 687,610.29 70°16'33.001 N 148°28'55.99 W 9,961.01 89.05 120.24 8,808.12 1,543.66 209.97 5,952,768.52 687,637.51 70°16'32.865 N 148°28'55.21 W 9,991.21 88.50 126.18 8,808.77 1,527.13 235.22 5,952,752.62 687,663.16 70°16'32.702 N 148°28'54.47 W 10,022.17 87.97 123.64 8,809.72 1,509.42 260.59 5,952,735.55 687,688.97 70°16'32.528 N 148°28'53.73 W 10,050.67 88.56 121.47 8,810.58 1,494.09 284.60 5,952,720.83 687,713.35 70°16'32.377 N 148°28'53.03 W 10,080.59 88.89 118.92 8,811.25 1,479.05 310.45 5,952,706.44 687,739.57 70°16'32.229 N 148°28'52.28 W 10,112.23 90.03 123.34 8,811.55 1,462.70 337.53 5,952,690.76 687,767.04 70°16'32.068 N 148°28'51.49 W 10,140.53 88.74 127.63 8,811.85 1,446.28 360.57 5,952,674.92 687,790.48 70°16'31.907 N 148°28'50.82 W 10,170.53 89.69 132.70 8,812.26 1,426.94 383.48 5,952,656.16 687,813.87 70°16'31.717 N 148°28'50.15 W 10,201.13 89.11 137.85 8,812.58 1,405.20 405.01 5,952,634.97 687,835.92 70°16'31.503 N 148°28'49.53 W 10,231.11 86.99 141.10 8,813.61 1,382.43 424.47 5,952,612.69 687,855.95 70°16'31.279 N 148°28'48.96 W 10,260.33 81.30 142.63 8,816.58 1,359.58 442.41 5,952,590.30 687,874.46 70°16'31.054 N 148°28'48.44 W 10,294.43 73.33 141.89 8,824.07 1,333.29 462.76 5,952,564.52 687,895.45 70°16'30.796 N 148°28'47.85 W 10,326.20 65.72 142.67 8,835.17 1,309.77 480.96 5,952,541.46 687,914.23 70°16'30.564 N 148°28'47.32 W 10,350.61 59.21 144.19 8,846.45 1,292.40 493.85 5,952,524.42 687,927.55 70°16'30.393 N 148°28'46.94 W 10,375.10 52.00 142.14 8,860.28 1,276.23 505.95 5,952,508.56 687,940.04 70°16'30.234 N 148°28'46.59 W 10,400.07 48.42 138.58 8,876.26 1,261.45 518.17 5,952,494.09 687,952.63 70°16'30.089 N 148°28'46.23 W 11/5/2014 2:18:32PM Page 3 COMPASS 5000.1 Build 61 ri- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B:) Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Well: 02-32 North Reference: True Wellbore: 02-32C Survey Calculation Method: Minimum Curvature Design: 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +El-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 10,429.73 54.58 135.35 8,894.72 1,244.52 534.02 5,952,477.56 687,968.89 70°16'29.922 N 148°28'45.77 W 10,460.33 61.38 134.17 8,910.93 1,226.27 552.44 5,952,459.77 687,987.76 70°16'29.743 N 148°28'45.24 W 10,490.36 70.01 134.19 8,923.28 1,207.21 572.05 5,952,441.21 688,007.84 70°16'29.555 N 148°28'44.66 W 10,523.11 78.24 133.44 8,932.23 1,185.42 594.76 5,952,420.00 688,031.08 70°16'29.341 N 148°28'44.00 W 10,554.18 88.68 134.07 8,935.76 1,164.10 617.02 5,952,399.24 688,053.87 70°16'29.131 N 148°28'43.35 W ' 10,579.71 89.57 137.61 8,936.15 1,145.79 634.80 5,952,381.38 688,072.10 70°16'28.951 N 148°28'42.84 W 10,614.88 88.43 141.74 8,936.77 1,118.99 657.56 5,952,355.15 688,095.51 70°16'28.688 N 148°28'42.17 W 10,658.36 87.11 147.83 8,938.46 1,083.51 682.60 5,952,320.31 688,121.43 70°16'28.339 N 148°28'41.45 W 10,691.76 87.64 153.77 8,939.99 1,054.40 698.87 5,952,291.62 688,138.42 70°16'28.052 N 148°28'40.97 W 10,718.60 87.33 158.54 8,941.17 1,029.88 709.70 5,952,267.38 688,149.86 70°16'27.811 N 148°28'40.66 W 10,748.28 86.96 162.75 8,942.65 1,001.92 719.53 5,952,239.67 688,160.37 70°16'27.536 N 148°28'40.37 W 10,778.35 86.65 167.65 8,944.33 972.90 727.19 5,952,210.86 688,168.76 70°16'27.251 N 148°28'40.15 W 10,808.36 87.42 170.14 8,945.88 943.50 732.97 5,952,181.60 688,175.26 70°16'26.962 N 148°28'39.98 W 10,838.44 88.43 173.81 8,946.97 913.74 737.16 5,952,151.96 688,180.20 70°16'26.669 N 148°28'39.86 W 10,868.45 88.10 178.77 8,947.88 883.81 739.10 5,952,122.10 688,182.88 70°16'26.375 N 148°28'39.80 W 10,898.80 89.39 179.86 8,948.54 853.47 739.46 5,952,091.78 688,184.00 70°16'26.076 N 148°28'39.79 W 10,928.43 88.62 175.52 8,949.06 823.88 740.66 5,952,062.22 688,185.93 70°16'25.785 N 148°28'39.76 W 10,962.26 88.68 171.41 8,949.86 790.29 744.51 5,952,028.74 688,190.62 70°16'25.455 N 148°28'39.64 W 10,988.06 89.69 168.88 8,950.22 764.87 748.92 5,952,003.44 688,195.66 70°16'25.205 N 148°28'39.52 W 11,018.61 88.62 166.20 8,950.67 735.05 755.51 5,951,973.79 688,202.99 70°16'24.912 N 148°28'39.32 W 11,048.01 88.03 162.32 8,951.53 706.77 763.48 5,951,945.72 688,211.66 70°16'24.633 N 148°28'39.09 W 11,078.72 87.51 158.69 8,952.73 677.84 773.72 5,951,917.07 688,222.62 70°16'24.349 N 148°28'38.79 W 11,108.33 89.08 154.59 8,953.61 650.68 785.45 5,951,890.20 688,235.02 70°16'24.082 N 148°28'38.45 W 11,137.87 89.23 150.02 8,954.05 624.53 799.18 5,951,864.41 688,249.39 70°16'23.825 N 148°28'38.05 W 11,168.58 88.96 145.97 8,954.53 598.50 815.45 5,951,838.79 688,266.31 70°16'23.569 N 148°28'37.58 W 11,198.92 88.99 142.67 8,955.07 573.86 833.14 5,951,814.60 688,284.61 70°16'23.326 N 148°28'37.06 W 11,228.78 88.77 145.27 8,955.66 549.72 850.70 5,951,790.91 688,302.76 70°16'23.089 N 148°28'36.55 W 11,259.18 88.77 150.00 8,956.31 524.06 866.96 5,951,765.66 688,319.66 70°16'22.836 N 148°28'36.08 W 11,288.62 89.54 153.86 8,956.74 498.09 880.81 5,951,740.04 688,334.15 70°16'22.581 N 148°28'35.68 W 11,318.76 90.25 161.02 8,956.80 470.27 892.37 5,951,712.53 688,346.39 70°16'22.307 N 148°28'35.34 W 11,348.86 89.79 162.05 8,956.79 441.72 901.90 5,951,684.22 688,356.63 70°16'22.027 N 148°28'35.06 W 11,379.00 89.69 164.03 8,956.93 412.90 910.69 5,951,655.63 688,366.14 70°16'21.743 N 148°28'34.81 W 11,408.85 89.60 167.91 8,957.11 383.94 917.93 5,951,626.86 688,374.09 70°16'21.458 N 148°28'34.60 W 11,439.07 88.47 169.27 8,957.62 354.33 923.90 5,951,597.41 688,380.81 70°16'21.167 N 148°28'34.42 W 11,469.78 88.74 174.08 8,958.37 323.96 928.35 5,951,567.16 688,386.00 70°16'20.868 N 148°28'34.29 W 11,502.18 89.08 178.09 8,958.98 291.65 930.56 5,951,534.92 688,389.02 70°16'20.551 N 148°28'34.23 W 11,529.83 89.63 182.56 8,959.30 264.00 930.40 5,951,507.28 688,389.55 70°16'20.279 N 148°28'34.23 W 11,559.74 90.95 188.43 8,959.14 234.25 927.54 5,951,477.46 688,387.43 70°16'19.986 N 148°28'34.32 W 11,592.70 90.43 194.24 8,958.75 201.95 921.06 5,951,445.01 688,381.76 70°16'19.668 N 148°28'34.51 W 11,621.08 89.51 201.62 8,958.76 174.96 912.33 5,951,417.82 688,373.71 70°16'19.403 N 148°28'34.76 W 11,651.17 88.62 205.57 8,959.25 147.40 900.29 5,951,389.97 688,362.36 70°16'19.132 N 148°28'35.11 W 11,682.23 88.00 202.74 8,960.17 119.07 887.59 5,951,361.34 688,350.37 70°16'18.853 N 148°28'35.48 W 11,711.85 86.90 197.76 8,961.49 91.32 877.35 5,951,333.34 688,340.82 70°16'18.580 N 148°28'35.78 W 11,740.75 87.18 194.70 8,962.98 63.61 869.29 5,951,305.44 688,333.45 70°16'18.308 N 148°28'36.01 W 11,772.32 88.07 190.86 8,964.29 32.86 862.31 5,951,274.52 688,327.24 70°16'18.005 N 148°28'36.22 W 11,802.18 87.60 185.74 8,965.42 3.34 858.00 5,951,244.91 688,323.67 70°16'17.715 N 148°28'36.34 W 11,836.26 86.74 183.36 8,967.10 -30.59 855.30 5,951,210.93 688,321.82 70°16'17.381 N 148°28'36.42 W 11,875.00 86.74 183.36 8,969.30 -69.20 853.04 5,951,172.27 688,320.51 70°16'17.002 N 148°28'36.49 W Projection to TD 11/5/2014 2 18.32PM Page 4 COMPASS 5000.1 Build 61 • 21 7 256199 by iil,;:ft!,:1111,.:',,,,,!:::,,,,,,i1v.i:„,;;;;..c',,,,,,,',,,,,`,:!,,,,,,,,,i:6,F:'!: North America - ALASKA - BP Prudhoe Bay .,':',::::''';'''''''''':':i':':';"'':'''''''1,..--:L',.-7''''4'':e''''':':'r*:E,''rl:;:::''I':'i::'::,*''''!:':''',','''''4':*''',1:::::':,':''..::'''',k';'":':'It'',':'''''''''''',,::::::''''1;4:.:::'ri::':':':'P'''1:::'':'','''''*''''ei,:'",':'''''''':',''1,''''4:'''',,'r':'**:!'''''',.,''E':'''''''''',' PB DS 02 02-32 EIVED 500292220900 APR 02 lbs .,,::,,,,,,,,,,,,z.,,,.v.,,__._:,,,,,,4:„.,,,,,,,i,.,:t.,,,,,,,,,,,,,,:,,,,,,:„,,o,,,,,,-,,,,,,,,o;:,,,,,ri,.„,,,,,!::,t:,,,.r.,ro,,,,,,,,,,,,,,,,„,,,,,,,, 1 02-32C -,:::,,rt,,„,,,,,,,,,y,,,,, 4,04,4930/4 Design: 02-32C Survey Report - Geographic 44,9104,04,40, 1 05 November, 2014 ;:.o,;:;::?:::,r,::o;t::';::i",,,,,:i.::::;::i.::,,,''';:..ii:,,,::,:,,,',;.,',''i:,'t',i:i 4,:p410 4,41 w 1 44,4040.4, 1Pra 11111111 H1 GHES VC- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay ND Reference: 2-32B:@ 56.60usft(2-32B:) Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Well: 02-32 North Reference: True Wellbore: 02-32C Survey Calculation Method: Minimum Curvature Design: 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 02,TR-11-14 Site Position: Northing: 5,948,800.37 usft Latitude: 70°15'53.847 N From: Map Easting: 687,638.44 usft Longitude: 148°28'58.06 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.43 ° Well 02-32 API No. 500292220900 Well Position +NI-S 0.00 usft Northing: 5,951,220.20 usft Latitude: 70°16'17.683 N +E/-W 0.00 usft Easting: 687,466.07 usft Longitude: 148°29'1.32 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 30.60 usft Wellbore 02-32C API no. 500292220903 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2014 10/24/2014 19.68 81.01 57,601 Design 02-32C Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,009.14 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (°) 26.00 0 00 0 00 94.64 Survey Program Date: 11/5/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 187.60 6,564.60 1 :MWD-Standard(02-32) MWD MWD-Standard 6,621.00 9,009.14 2-32B IFR(02-32B) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 9,041.00 9,160.49 Inc+Trend(02-32C) INC+TREND Inclinometer+known azi trend 9,191.74 11,836.26 MWD(02-32C) MWD MWD-Standard 11/5/2014 2:18:32PM Page 2 COMPASS 5000.1 Build 61 Id- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-328:) Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Well: 02-32 North Reference: True Wellbore: 02-32C Survey Calculation Method: Minimum Curvature Design: 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,009.14 51.44 352.24 8,721.13 1,037.28 -284.27 5,952,250.01 687,156.07 70°16'27.884 N 148°29'9.60 W TIP 9,041.00 53.46 351.69 8,740.55 1,062.29 -287.80 5,952,274.92 687,151.92 70°16'28.130 N 148°29'9.70 W KOP 9,070.35 57.33 351.59 8,757.21 1,086.18 -291.31 5,952,298.72 687,147.81 70°16'28.365 N 148°29'9.80 W Interpolated Azimuth 9,100.32 62.75 351.48 8,772.18 1,111.86 -295.13 5,952,324.29 687,143.35 70°16'28.618 N 148°29'9.91 W Interpolated Azimuth 9,130.32 68.92 351.39 8,784.45 1,138.91 -299.21 5,952,351.23 687,138.61 70°16'28.884 N 148°29'10.03 W Interpolated Azimuth 9,160.49 75.87 351.29 8,793.57 1,167.32 -303.53 5,952,379.53 687,133.57 70°16'29.163 N 148°29'10.16 W Interpolated Azimuth 9,191.74 82.19 351.21 8,799.51 1,197.63 -308.20 5,952,409.71 687,128.16 70°16'29.461 N 148°29'10.29 W 9,220.46 89.39 352.52 8,801.62 1,225.96 -312.25 5,952,437.93 687,123.40 70°16'29.740 N 148°29'10.41 W 9,250.43 92.42 359.10 8,801.15 1,255.83 -314.44 5,952,467.73 687,120.47 70°16'30.034 N 148°29'10.48 W 9,281.95 90.46 2.56 8,800.36 1,287.33 -313.98 5,952,499.23 687,120.14 70°16'30.344 N 148°29'10.46 W 9,310.56 90.09 9.26 8,800.22 1,315.77 -311.03 5,952,527.73 687,122.38 70°16'30.623 N 148°29'10.38 W 9,341.20 91.23 16.85 8,799.86 1,345.59 -304.12 5,952,557.72 687,128.55 70°16'30.917 N 148°29'10.18 W 9,370.65 89.05 24.13 8,799.79 1,373.16 -293.82 5,952,585.53 687,138.16 70°16'31.188 N 148°29'9.88 W 9,402.86 91.66 31.30 8,799.59 1,401.65 -278.85 5,952,614.39 687,152.41 70°16'31.468 N 148°29'9.44 W 9,430.35 90.95 36.87 8,798.97 1,424.41 -263.45 5,952,637.52 687,167.23 70°16'31.692 N 148°29'8.99 W 9,460.15 89.82 42.52 8,798.77 1,447.32 -244.43 5,952,660.90 687,185.68 70°16'31.917 N 148°29'8.44 W 9,484.89 89.72 48.73 8,798.86 1,464.62 -226.75 5,952,678.63 687,202.92 70°16'32.087 N 148°29'7.92 W 9,514.90 92.18 51.89 8,798.37 1,483.78 -203.67 5,952,698.35 687,225.52 70°16'32.276 N 148°29'7.25 W 9,544.80 89.14 54.47 8,798.02 1,501.69 -179.74 5,952,716.86 687,248.99 70°16'32.452 N 148°29'6.55 W 9,570.07 89.39 56.79 8,798.35 1,515.95 -158.88 5,952,731.64 687,269.48 70°16'32.592 N 148°29'5.95 W 9,600.05 88.65 59.93 8,798.86 1,531.68 -133.37 5,952,747.99 687,294.60 70°16'32.747 N 148°29'5.20 W 9,630.76 87.05 62.92 8,800.01 1,546.35 -106.42 5,952,763.33 687,321.17 70°16'32.891 N 148°29'4.42 W 9,660.47 88.56 67.37 8,801.15 1,558.83 -79.49 5,952,776.47 687,347.78 70°16'33.014 N 148°29'3.64 W 9,690.58 89.26 71.95 8,801.72 1,569.29 -51.27 5,952,787.63 687,375.73 70°16'33.117 N 148°29'2.81 W 9,720.69 89.48 77.01 8,802.05 1,577.34 -22.27 5,952,796.40 687,404.52 70°16'33.196 N 148°29'1.97 W 9,750.58 88.59 82.54 8,802.56 1,582.65 7.13 5,952,802.44 687,433.78 70°16'33.248 N 148°29'1.11 W 9,780.61 88.19 87.03 8,803.40 1,585.37 37.02 5,952,805.91 687,463.58 70°16'33.275 N 148°29'0.24 W 9,810.57 88.46 92.82 8,804.28 1,585.41 66.95 5,952,806.69 687,493.51 70°16'33.275 N 148°28'59.37 W 9,840.64 88.53 98.30 8,805.07 1,582.50 96.86 5,952,804.53 687,523.47 70°16'33.247 N 148°28'58.50 W 9,870.76 88.65 103.37 8,805.81 1,576.84 126.42 5,952,799.61 687,553.17 70°16'33.191 N 148°28'57.64 W 9,900.97 88.50 108.82 8,806.56 1,568.47 155.43 5,952,791.96 687,582.37 70°16'33.109 N 148°28'56.80 W 9,930.74 88.25 114.35 8,807.41 1,557.53 183.09 5,952,781.71 687,610.29 70°16'33.001 N 148°28'55.99 W 9,961.01 89.05 120.24 8,808.12 1,543.66 209.97 5,952,768.52 687,637.51 70°16'32.865 N 148°28'55.21 W 9,991.21 88.50 126.18 8,808.77 1,527.13 235.22 5,952,752.62 687,663.16 70°16'32.702 N 148°28'54.47 W 10,022.17 87.97 123.64 8,809.72 1,509.42 260.59 5,952,735.55 687,688.97 70°16'32.528 N 148°28'53.73 W 10,050.67 88.56 121.47 8,810.58 1,494.09 284.60 5,952,720.83 687,713.35 70°16'32.377 N 148°28'53.03 W 10,080.59 88.89 118.92 8,811.25 1,479.05 310.45 5,952,706.44 687,739.57 70°16'32.229 N 148°28'52.28 W 10,112.23 90.03 123.34 8,811.55 1,462.70 337.53 5,952,690.76 687,767.04 70°16'32.068 N 148°28'51.49 W 10,140.53 88.74 127.63 8,811.85 1,446.28 360.57 5,952,674.92 687,790.48 70°16'31.907 N 148°28'50.82 W 10,170.53 89.69 132.70 8,812.26 1,426.94 383.48 5,952,656.16 687,813.87 70°16'31.717 N 148°28'50.15 W 10,201.13 89.11 137.85 8,812.58 1,405.20 405.01 5,952,634.97 687,835.92 70°16'31.503 N 148°28'49.53 W 10,231.11 86.99 141.10 8,813.61 1,382.43 424.47 5,952,612.69 687,855.95 70°16'31.279 N 148°28'48.96 W 10,260.33 81.30 142.63 8,816.58 1,359.58 442.41 5,952,590.30 687,874.46 70°16'31.054 N 148°28'48.44 W 10,294.43 73.33 141.89 8,824.07 1,333.29 462.76 5,952,564.52 687,895.45 70°16'30.796 N 148°28'47.85 W 10,326.20 65.72 142.67 8,835.17 1,309.77 480.96 5,952,541.46 687,914.23 70°16'30.564 N 148°28'47.32 W 10,350.61 59.21 144.19 8,846.45 1,292.40 493.85 5,952,524.42 687,927.55 70°16'30.393 N 148°28'46.94 W 10,375.10 52.00 142.14 8,860.28 1,276.23 505.95 5,952,508.56 687,940.04 70°16'30.234 N 148°28'46.59 W 10,400.07 48.42 138.58 8,876.26 1,261.45 518.17 5,952,494.09 687,952.63 70°16'30.089 N 148°28'46.23 W 11/5/2014 2:18:32PM Page 3 COMPASS 5000.1 Build 61 °" Vfr iby Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-328:@ 56.60usft(2-328) Site: PB DS 02 MD Reference: 2-328:@ 56.60usft(2-32B:) Well: 02-32 North Reference: True Wellbore: 02-32C Survey Calculation Method: Minimum Curvature Design: 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Survey I Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 10,429.73 54.58 135.35 8,894.72 1,244.52 534.02 5,952,477.56 687,968.89 70°16'29.922 N 148°28'45.77 W 10,460.33 61.38 134.17 8,910.93 1,226.27 552.44 5,952,459.77 687,987.76 70°16'29.743 N 148°28'45.24 W 10,490.36 70.01 134.19 8,923.28 1,207.21 572.05 5,952,441.21 688,007.84 70°16'29.555 N 148°28'44.66 W 10,523.11 78.24 133.44 8,932.23 1,185.42 594.76 5,952,420.00 688,031.08 70°16'29.341 N 148°28'44.00 W 10,554.18 88.68 134.07 8,935.76 1,164.10 617.02 5,952,399.24 688,053.87 70°16'29.131 N 148°28'43.35 W 10,579.71 89.57 137.61 8,936.15 1,145.79 634.80 5,952,381.38 688,072.10 70°16'28.951 N 148°28'42.84 W 10,614.88 88.43 141.74 8,936.77 1,118.99 657.56 5,952,355.15 688,095.51 70°16'28.688 N 148°28'42.17 W 10,658.36 87.11 147.83 8,938.46 1,083.51 682.60 5,952,320.31 688,121.43 70°16'28.339 N 148°28'41.45 W 10,691.76 87.64 153.77 8,939.99 1,054.40 698.87 5,952,291.62 688,138.42 70°16'28.052 N 148°28'40.97 W 10,718.60 87.33 158.54 8,941.17 1,029.88 709.70 5,952,267.38 688,149.86 70°16'27.811 N 148°28'40.66 W 10,748.28 86.96 162.75 8,942.65 1,001.92 719.53 5,952,239.67 688,160.37 70°16'27.536 N 148°28'40.37 W 10,778.35 86.65 167.65 8,944.33 972.90 727.19 5,952,210.86 688,168.76 70°16'27.251 N 148°28'40.15 W 10,808.36 87.42 170.14 8,945.88 943.50 732.97 5,952,181.60 688,175.26 70°16'26.962 N 148°28'39.98 W 10,838.44 88.43 173.81 8,946.97 913.74 737.16 5,952,151.96 688,180.20 70°16'26.669 N 148°28'39.86 W 10,868.45 88.10 178.77 8,947.88 883.81 739.10 5,952,122.10 688,182.88 70°16'26.375 N 148°28'39.80 W 10,898.80 89.39 179.86 8,948.54 853.47 739.46 5,952,091.78 688,184.00 70°16'26.076 N 148°28'39.79 W 10,928.43 88.62 175.52 8,949.06 823.88 740.66 5,952,062.22 688,185.93 70°16'25.785 N 148°28'39.76 W 10,962.26 88.68 171.41 8,949.86 790.29 744.51 5,952,028.74 688,190.62 70°16'25.455 N 148°28'39.64 W 10,988.06 89.69 168.88 8,950.22 764.87 748.92 5,952,003.44 688,195.66 70°16'25.205 N 148°28'39.52 W 11,018.61 88.62 166.20 8,950.67 735.05 755.51 5,951,973.79 688,202.99 70°16'24.912 N 148°28'39.32 W 11,048.01 88.03 162.32 8,951.53 706.77 763.48 5,951,945.72 688,211.66 70°16'24.633 N 148°28'39.09 W 11,078.72 87.51 158.69 8,952.73 677.84 773.72 5,951,917.07 688,222.62 70°16'24.349 N 148°28'38.79 W 11,108.33 89.08 154.59 8,953.61 650.68 785.45 5,951,890.20 688,235.02 70°16'24.082 N 148°28'38.45 W 11,137.87 89.23 150.02 8,954.05 624.53 799.18 5,951,864.41 688,249.39 70°16'23.825 N 148°28'38.05 W 11,168.58 88.96 145.97 8,954.53 598.50 815.45 5,951,838.79 688,266.31 70°16'23.569 N 148°28'37.58 W 11,198.92 88.99 142.67 8,955.07 573.86 833.14 5,951,814.60 688,284.61 70°16'23.326 N 148°28'37.06 W 11,228.78 88.77 145.27 8,955.66 549.72 850.70 5,951,790.91 688,302.76 70°16'23.089 N 148°28'36.55 W 11,259.18 88.77 150.00 8,956.31 524.06 866.96 5,951,765.66 688,319.66 70°16'22.836 N 148°28'36.08 W 11,288.62 89.54 153.86 8,956.74 498.09 880.81 5,951,740.04 688,334.15 70°16'22.581 N 148°28'35.68 W 11,318.76 90.25 161.02 8,956.80 470.27 892.37 5,951,712.53 688,346.39 70°16'22.307 N 148°28'35.34 W 11,348.86 89.79 162.05 8,956.79 441.72 901.90 5,951,684.22 688,356.63 70°16'22.027 N 148°28'35.06 W 11,379.00 89.69 164.03 8,956.93 412.90 910.69 5,951,655.63 688,366.14 70°16'21.743 N 148°28'34.81 W 11,408.85 89.60 167.91 8,957.11 383.94 917.93 5,951,626.86 688,374.09 70°16'21.458 N 148°28'34.60 W 11,439.07 88.47 169.27 8,957.62 354.33 923.90 5,951,597.41 688,380.81 70°16'21.167 N 148°28'34.42 W 11,469.78 88.74 174.08 8,958.37 323.96 928.35 5,951,567.16 688,386.00 70°16'20.868 N 148°28'34.29 W 11,502.18 89.08 178.09 8,958.98 291.65 930.56 5,951,534.92 688,389.02 70°16'20.551 N 148°28'34.23 W 11,529.83 89.63 182.56 8,959.30 264.00 930.40 5,951,507.28 688,389.55 70°16'20.279 N 148°28'34.23 W 11,559.74 90.95 188.43 8,959.14 234.25 927.54 5,951,477.46 688,387.43 70°16'19.986 N 148°28'34.32 W 11,592.70 90.43 194.24 8,958.75 201.95 921.06 5,951,445.01 688,381.76 70°16'19.668 N 148°28'34.51 W 11,621.08 89.51 201.62 8,958.76 174.96 912.33 5,951,417.82 688,373.71 70°16'19.403 N 148°28'34.76 W 11,651.17 88.62 205.57 8,959.25 147.40 900.29 5,951,389.97 688,362.36 70°16'19.132 N 148°28'35.11 W 11,682.23 88.00 202.74 8,960.17 119.07 887.59 5,951,361.34 688,350.37 70°16'18.853 N 148°28'35.48 W 11,711.85 86.90 197.76 8,961.49 91.32 877.35 5,951,333.34 688,340.82 70°16'18.580 N 148°28'35.78 W 11,740.75 87.18 194.70 8,962.98 63.61 869.29 5,951,305.44 688,333.45 70°16'18.308 N 148°28'36.01 W 11,772.32 88.07 190.86 8,964.29 32.86 862.31 5,951,274.52 688,327.24 70°16'18.005 N 148°28'36.22 W 11,802.18 87.60 185.74 8,965.42 3.34 858.00 5,951,244.91 688,323.67 70°16'17.715 N 148°28'36.34 W 11,836.26 86.74 183.36 8,967.10 -30.59 855.30 5,951,210.93 688,321.82 70°16'17.381 N 148°28'36.42 W 11,875.00 86.74 183.36 8,969.30 -69.20 853.04 5,951,172.27 688,320.51 70°16'17.002 N 148°28'36.49 W Projection to TD 11/5/2014 2:18:32PM Page 4 COMPASS 5000.1 Build 61 Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. al 4 - _I L 7 Well History File Identifier Organizing(done) ❑ Two-sided ❑ Rescan Needed RESCAN: OVERSIZED: NOTES: vvito or Items: ❑ Ma s: Grayscale Items: ogs: ❑ Poor Quality Originals: El Other: El Other: BY: Clv-1-apla Date: ../9//5"." /s/ fil,f Project Proofing BY: (Maria) Date: g 99//5— /s/ rvi P Scanning Preparation 3 x 30 = go + c L =TOTAL PAGES //4' (Count does not include cover sheet) ryi BY: Maria Date: �, �/ / /s/ Production Scanning Stage 1 Page Count from Scanned File: 1 I3 (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: V ' ES NO BY: AIM Date: cg. / /e.5— /s/ yvjp Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Stage 2 Additional Well Reports: YES NO TOTAL PAGES: Digital version appended by: Meredith Michel Date: /s/ Final Page Count: Stage 1 + Stage 2: TOTAL PAGES: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: /s/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc 0 SII . • v • ♦ 0 Ly I _W I W_ I W N o) 0 LL • I 0 WI 0 Y • _1 LL O C O �N _ 111 J Lll J -E 'C a 0 (0 W JI N Z \ O TO JI Z JI Z n n > N — Y JI _z e O) 0 N 2 Q LI Q LL W rt cy). 74,„; m 0 < LL aAi N a)I z �1 z �I T T ,� I _1 Z NI w o LL Cl) I� CO a) a) y y c m 2 LL U) R o I 0 1 0 Z Z L) m I 0 b aa)in 0 2 H > in (n a �I Z �I v1 vI vl m m H ''I S vo. 1 Tr- H d u) N o o o o Li: j,L LL LL UI 0 0 0 Q N > N N 0 0 0 0 2 0I 01 > C CO O Z Z Z Z 0 0 0 0 M M ml M M Z Z J U p N� N� E N � NVQ N N N N N C N N Nct NN, N , 00 O O go O O O 0 a O O O O O C O O 00 O O w, O 0 O C Gi NI E N NI Y 0 NI LL •N u Y N N N N N 2 N N 0 m1.� ai 01 O ? 0 of E m LL H E d LL c2 H LL LL E LL LL 0 LL LL LL B LLL o Y w d E g Iv. . 10, 0 IY O 10 c) O 0 . g s g L) O 16 a 10, .7. . E CcCH CCC-1 C1H CCe-1 C C C C *ELo1 C C -Ed' O •c IY—I U) �o o 0 2010 20j1 2010 Q011 0 0 0 0 0(N 2 2 2001Q0Im J a)N=1 a)N01 NNI NNO1 N N a) a)N a) a) a)N=1 a)N0 E W000 LuC)J W corn WMJ W W W W Ill CO W W WMm WMJ O O Z0 j '- R V V V V V Tr V V R V CI. V Y > N N N N N N N N N N N N N W ¢ .co CO M M M M M CO O @ N N N N N N N N N N N N N COcc e- e- e- e- . . . . . e- e- e- e- rW W , Q, 9_ V J O. • pI O c) Z Q O. ,O o 0 o. .N• 7+ is N CL co 0 O N :c-, co N C� �' E E T- 0 N U o LO c —J C.> ♦Y Z — Q M o. I— v co ? J 2 pN J m Q V co co CO V J N O a) C CI uo O vi 1 Q accc 1 fx Q Z E zl 0 0 d 0 I', 0 0 E J co 2 Z 2 co co a) co co coo co coo co CO @ CO CO O N CO CO CO CO CO CO CO N (o CO CO CO CO a E E D 0 0 0 0 0 0 0 0 0 0 0 0 0 7 CO To co co co co co co co co To To To To _o 'o) 'rn 'o_) 0) '0) 'o) 'rn .CO o) 0) 'm .2' co) I o D Z o ` 0 0 0 0 0 0 0 0 0 0 0 0 0 • H r H d C) w E N N N N NNN N N NNN N Q Z L C m l0 7 )O LO LO to Lo LO LO CO LO LO LO LO LO N 2 0 O 0 W 0 z N N N N N N N N N N N N N O Q o £ E LL 1- co ,_V O co o o 5 o 0 c Z W o 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 E 5 Q W J O `a) 0 O I- c. ) am2 o ID 0 0 0 0 0 0 0 0 0 0 0 0 d Ce 0 IT 3 J 0 F 1_ W W W W W W W W W W W W 0 • .n o ` o c•9 > W J I W_ J I W_ N o 3 0 LL Q LL Q LL Q N v- ch 0 Z I Y 1 0 N Z 0 OI Q LLI QI LLI • co N U Ql LLI H Z Z o x _ Z cn ca N U LL (n LL co N a) N N 2 LL in 0 p o M 01 > 01 > m n m m 'r• ml DI 0 M LL 0 N ft a 2HI 2I l cnc n in in 2 Y T in o N °o I a1 1 0UvI- a V a v TO 3 v v IO NN it it LL LL UOI 01Z 2 E N N 1 U U U U 0LL ma m mLL LL CD 2 m U LR'O VE LL U U U U Cpd U U N N N N 0 MNMMU N I 1V l IJNNE NNNNNNN N a Nl N N N NN N NNNN (n-UJ Q 00) oY o 0NY 0 O o 0 0 O 0 0w 0 O 0 0 coz uIo icrH CC 0_ )CCH ) CC o a 1 1 O I D Y aI U CD I u 10 agaa6" am o o Ip uIU s- @-1UIL-�� iii-1 it-��Y it -I iii LLiuiliLLoi -1om !LLi � l N COC1O = I l c) lmI 1oIm o i o v o v t o I o�VI c) I 1.11 oO� _ C- - C '- IC '- - C' I Ca C C C C ' C ' C C- - C� a 1" O1 . 0002 oOOo m occo •E O •E O1. O om oto O °cox oco 1C 0y 1 � D ..0_ 121 J _ 1 INNNN0 00 NNW __No NW NN NN N NN N N-NONNW aNU Q „W NNoN0 _ _ _ _ _NIN2 ce W M N WMJ WMLL WMJ WMLL WW WW W W W M W M W WMJ WMLL W M O OO j V V V V V V V VTrTrTr CL 0 5 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N N N N N W M M M M M M N) M M M M M M C') M N N N N N N N N N N N N N N N AI O J N N N N N N N N N N N N N N N EL W W J \Y V pap O Z n o Q a w o 0 0 d a m CL o u) Co o o In G 0 0 w CT) V • N E in U c� v w 0 V N Q N m M OA A Na. O Z V S Z 0 = Ul O N C A p 0 Q a ° F m Q c a Q Z E m U c E a a c) Z m `N a° a co a m a CO 03 03 CO M a CO 0 m m -o a a CO a a a cd CO a CO a m a a is C<73 D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 m To To To To To To To is To m m To CO m o 'a) 'm o a) _ a) a) 'a) 'o) o_) a) 'o_) a) a) J 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o0 r 1 V V ua to Lo _M Lo to til in in M _M 44 _� La r 1- N N N N N N N N N N N N N N N N 0 ✓ N N N N N N N N N N N N N N N N N F. (C) 0 r ao • i- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U C7 d 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q 0. 2 J w w w w LU w w w w w w LU w w LU O ^ e -- ' i , v, o 0 0 O ^ ' en N ml N I 15 ns LL C7 o 0 co 0 CV CD 0 N z d p N p N pJ } } F> Z > > > U O O Cl N to i to f m CO O c co i° OO oo 0 o s iHc � C 12) Q zO z Z'� LZ E coO E N co O O NO O O N N L O >- a aU) > 0 < U a Q 00 LL a iia d < toz o CO CO o o 2ay H.,1-1-1 U) oai oQi CV CV 0 U U J C.) a� 41 15 Z13 O I a < 0 dl o dl col O U CLL..)Q it 2 0 0 d(n Ct a) �\ 'o o 2 v, 2 2 22 22 2 ow E I- 10 ce _ _ _ _ cop O N'= N N NI2 N NI O N W C) @ co r C NJ WMm WM N a]PI WM'O WM WM N2 CO a) 0 it Oz O u') M i1) O.- .0 w co W eri=• U N N N N N N• m N 7 0 f\�'i M M M (h f7 U) z a) Ce O r r r r W O) a) ap a. � u E o 111 coco CV ICC A o r� r- Om co CL O o 8 co O N L co co a) co co O N o- in Vo O w.N N ,lam�J\ c O o a) Q Tcsi o a co o o E o 5 _2 Q c aa)) E CCI m o 1- E Y w CO p p N • c -E o ICE m cc o cu r a a) cco o Q a E. O Z E cLi > Q al U• co y c 0 0 E m co Z co co ma co co M77 co 0 0 0 0 0 0 aa)) c N O co O) O) O) co 00 •� } O C J 0 0 0 0 0 O J E L]\��J c O I- M UD u3 U3 up V V V V 1- . C - f0 CL N N cll N LO N to N N N N —LLD 111 W E O. O ✓ N N N N N N N N a) W O F N N a d pC o c N E ui E E Za) coY w m n IX ` V 0 «)a o CO Q o Q o o o u— y U o U U U U U U a N: m N C7 E V OOIpE -p N O- CO 0Qd p 0 0 0 0 0 0 p y LL O O 0 0 o a. 2 J w w W w w w J 3 Z 0 d 0 11 0 0 cc 0 ,n o p el N o T o o N Z N n Cil os _U 0 o 5 [z. N J" b Com. Z \ ..= 4 J 1 ✓ O Z • Cr) 7 ate+• CI O Z t Om IX ° U IX ° J a W w J V m o Z Q w d J a Cl. c � o O 0tij 0 j E w V ° c N U a) 1o J N E E u Q Cy Ocz r N O. 0 H z s C CV m m W O a) :; o 0 0 Q a < O a Z E 0 E U co Z m • rn a7 al co ro > m T- I- V r m et 3 N 1m N > I IX D co O a) v w - a ,u v E o E c o �, E E Q a CI M CI V 1 C) 21 41 17 Letter of Transmittal TAM BAKER Date: DATA LOGGED December 22, 2014 M.K.BEND€R HUGHES To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Jesse Salyer Jesse.S alyer@bakerhughes.corn Please find enclosed the final log data for the following well(s): 02-32CPB1, 02-32C 2 5 2 1 2 5 2 1 5 Enclosed for each well(s): 2 (ea.) hardcopy prints of final log data reports 1 compact disk containing electronic log data files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: , State of Alaska AOGCC DATE: RECEIVED / DEC 232014 ,7 / o_eiteat AOGCC 214117 Letter of Transmittal Date: BAKER DATA /2015D December 22 2014 t /S rro� 5 HUGHES - K.BENDER To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage,Alaska 99515 Jesse Salyer Jesse.Salyer@bakerhughes.com Please find enclosed the final log data for the following well(s): 02-32CPB1, 02-32C 25 2 1 4 2 5 215 Enclosed for each well(s): 2 (ea.) hardcopy prints of final log data reports 1 compact disk containing electronic log data files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: , State of Alaska AOGCC DATE: RECEIVED DEC 2 3 2014 :;'f '/ AOGCC Hunt, Jennifer L (DOA) From: Ramos,Tania (UOSS) <Tania.Ramos@bp.com> Sent: Monday, December 22, 2014 12:46 PM To: Hunt,Jennifer L(DOA) Cc: Lastufka,Joseph N Subject: PBU 02-32C/PTD#214-117 Categories: Attention Hi Jennifer, Please reference the following well: Well Name. PBU 02-32C Permit#. 214-117 API #: 50-029-22209-03-00 Date of Test. 12/21/14 Type of Test: IPT (Initial Production Test) Choke Size. 14 Choke Unit: Production Method: Flowing Duration (Hours Tested): 6 Top Reference (Top Perf MD): 10530' Bottom Reference (Bottom Perf MD): 11740' Tubing Flowing (Pressure): 0 Casing Pressure: 380 Total Test(Rate f/0, W, G): 103/ 5/4982 24-Hour Rate (0, W, G): 410/ 18/ 19927 Gravity (Oil, API): Not Available GOR (Gas-Oil Ratio): 48553 This well began Production on Method of Operations on this date: December 14, 2014 Thank you, Tania Ramos Information &Data Technologist BP Exploration (Alaska) Inc. 900 E. Benson Blvd MB 7-1 Anchorage, AK 99508 Direct: 907.564.5058 Fax: 907.564-4014 Cell: 907.947.7727 Email:tania.ramos@bp.com W 1 MS \`JAN - 5 20i5 RECEIVED STATE OF ALASKA ALASKM OIL AND GAS CONSERVATION COMMISSION DEC 0 4 2014 WELL COMPLETION OR RECOMPLETION REPORT AND LO(kQGCC 1 a. Well Status: . 0 011 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended lb. Well Class 20AAC 25 105 20AAC 25 110 0 Exploratory 0 Stratigraphic 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions ' One ' 0 Development ❑Service 2 Operator Name. 5. Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 11/7/2014 • 214-117 ' 3. Address: 6. Date Spudded. 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 10/20/2014 50-029-22209-03-00 ' 4a. Location of Well(Governmental Section): 7. Date T.D.Reached: 14. Well Name and Number: Surface' 11/3/2014 PBU 02-32C • 23'FSL,740'FWL, Sec.25,T11N, R14E, UM 8 KB(ft above MSL): 56.6' 15 Field/Pool(s) Top of Productive Horizon: 1239' FSL, 1302'FWL, Sec.25,T11N, R14E, UM GL(ft above MSL): 30.6' , Prudhoe Bay/Prudhoe Bay - Total Depth: 9.Plug Back Depth(MD+TVD) 47' FNL, 1593'FWL, Sec. 36,T11N, R14E, UM . 11840' 8967' 4b Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD) 16. Property Designation: Surface. x- 687466' y- 5951220` Zone- ASP4 - 11875' 8969' • ADL 028308 TPI: x- 687997 y- 5952451 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 688320 y- 5951172 Zone- ASP4 None 18. Directional Survey: 0 Yes 0 No — 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21 Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD/GR/RES, GR/CCL/RPM 9041' 8741' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT CASING WT.PER FT. GRADE ToP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 39' 116' 39' 116' 30" 11 cu yds Arcticset 13-3/8" 68# L-80 38' 3468' 38' 3468' 16" 120 cu ft CS III,2552 cu ft CS III,288 cu ft Class'G'_ 9-5/8" 47# L-80 35' 6621' 35' _ 6620' 12-1/4" 2090 cu ft Class'G' _ 7" 26# L-80 6461' 8506' 6461' 8336' 8-1/2" 404 cu ft Class'G' 4-1/2" 12.6# L-80 8327' 9041' 8177' 8741' 6-1/8" 345 cu ft Class'G' 3-1/2"x3-1/4"x2-7/8" 9 2#/6 6#/6 4# L-80 8972' 11875' 8698' 8969' 4-1/4"x 4-1/8" •168 sx Class'G' 24 Open to production or injection? 0 Yes 0 No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ND (MD+TVD of Top&Bottom;Perforation Size and Number): ) 2"Gun Diameter,6 spf 4-1/2", 12.6#,L-80 8328' 8271'/8127' COMPLETION+ 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 10530'-10700' 8934'-8940' (l /zf �I ? WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes 0 No 10760'-10880' 8943'-8948' I�-1 10935'-11480' 8949'-8959' VE, TIED DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 11505'-11630' 8959'-8959' _ 11700'-11740' 8961'-8963' .. . ,y„,: 2500' Freeze Protect w/40 Bbls Diesel 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF. WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL. OIL GRAVITY-API(CORR). Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes 0 No Sidewall Core(s)Acquired? 0 Yes 0 No. If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None Form 10-407 Revised 10/2012 CONTINUED ON REVERS / �b�ry�Orir�l Qra>Ii1 !/TL /712_1114_ /'v l - 2'� Y G' ,/�' �` RB LJLI. 1 / 1 tz ,ty 29. GEOLbGIC MARKERS(List all formations and rr '•ers encounter 30. FORMATION TESTS NAME i ND Well Tested? as ®No • Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. 22TS 9100' 8772' None 21 TS-Zone 2A 10287' 8822' Zone 1B 10408' 8881' TDF-Zone 1 A 10475' 8917' Formation at Total Depth: Zone 1A 10475' • 8917' 31 List of Attachment: Summary of Daily Drilling Reports,Summary of Post-Rig Work,Well Schematic Diagram, Surveys, Cement Report 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Nathan Sperry 564-4258 EmailNathan.Sperry@bp.com Printed Name: Joe Lastufk Title: Engineering Team Leader Signature* ' Phone 564-4091 Date: 12/4-I 14- INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13. The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation' Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071 Form 10-407 Revised 10/2012 Submit Original Only li TREE= 4-1/16"McEVOY O _ ACTUATOR ORS �� S M....DOGLEG 331T" 1055470°�10490' OKB.ELEV= 69' 1 BF.H-EV= NA /J KOP= 66`x_ 20"CONDUCTOR, --1 116' Max Angle= 92"@ 9250' 91.5#,I-140, DM]=3.81:- Datum .81S"( tum MD= 10369' I ' [1 4 � GASLFTPM D=19.124" Datum TVD= 8800'SS 13-3/8"CSG,68#,L-80,D=12.415" - 3468' ST IND TVD DEV TYPE VLV LATCH PORT DATE MM 3 3772 3772 0 G DOME RK16 11/28/14 N Minimum ID = 2.313" @ 8992' L 2 6021 6021 1 MMG SO RK 20 11/28/14 I 1 7877 7774 26 - -DAVKBG-2 DBK 0 03/06/02 2-7/8" X NIPPLE IN LTP 6461' H9-5/8"X 7"BKR TE BACK SLEEVE,D=7.75" 9-5/8"WHPSTOCK(XX/XX/XX) H -6621 6467' -9-5/8"X 7"BKR ZXP FKR,D=6.312" 9-518"CSG,47#,L-80 BTRS D=8.681" H -6621 - 6474' -9-5/8"X 7"BKR HMC HGR,D=6.290" 9-5/8"CSG MLLOUT WICOW (02-32B) 6621'-6638' I I 8268' H4-1/2"HES X NP,D=3.813" X X 8271' -I 7"X 4-112"BKR S-3 FKR,D=3.875" 8296' H 4-1/2"FES X NP,D=3.813" ' I 8316' -I4-112"FES XN NP,MLLED TO 3.80"(09/07/14) ..„...........1 ? -!BKR TEBACK SLV,D=5.250" 4-1/2"TBG,12.6#,L-80 IBT-M,.0152 bpi,D=3.958" H 8328' 8327' --17"X 4-1/2"BKR ZXP PKR,D=4.430" 8328' --14-1/2"WLEG,D=4.000" 8338• -7"X 4-112"BKR HMC HGR,D=4.430" 7'LN2,26#,L-80 BT-M,.0383 bpf,ID=6.276" -{ 8506' --A 8972' -4-112"D&D LTP A SSEMBLY,ID=2.375"(11/29/14) TOP OF 3-1/2"X 3-1/4"X 2-7/8"LNR/CevElIT - 8988' 8988' -3.70"DEPLOY SLV,D=3.00" ', i 8992' .-12-7/8"X NP,D=2.313' 9009' -13-112"FES X NP,D=2.813" 4-1/2"WHIPSTOCK(10/25/14) 9041' t 1 4-1/2"LNR,12.6#,L-80 BT,.0152 bpf,D=3.958' I-- -9041' : kjw MLLOUT WINDOW(02-32C) 9041'-9050' 3-1/2"LM ,9.2#,L-80 STL,.0087 bpf,13=2.992" H 9042' Z.. '� Imo _. %. ' . �N.'. 9042' -3-1/2"X 3-3/16"XO,13=2.786" PERFORATION SUMMARY �• �'i REF LOG: BKR FRPR/GR/CCL on 11/05/14 . • 10�" H3-3/18"X 2-7/8"XO,D=2.377" ANGLE AT TOP PERF: 81"©10530' � ..� Note:Refer to Production DB for historical perf data �**4� 1060TJ-12-7/8"MARKER PUP SIZE SFF NTBRVAL Opn/Sqz SHOSQZ N. '14 .i JTw/2 RA TAGS 2" 6 10530-10700 0 11/06/14 ''% . 2" 6 10760-10880 0 11/06/14 3-1/4"LNR,6.6#, 10606' �"'�W. 2" 6 10935-11480 0 11/06/14 L-80 TC11,.0079 bpf, .�` 2" 6 11505-11630 0 11/06/14 D=2.850" PBTD H Marl� ilk� �w, 2" 6 11700-11740 0 11/06/14 .VW 2-7/8"LAIR,6.4#,L-80 STL,.0058 bpf,D=2.441" -{ 11875' DATE REV BY COMMENTS DATE REV BY COMMS(TS PRUDHOE BAY UNIT 10/04/91 AID 3 INITIAL COMPLETION 11/25/14 TRIJMD CORRECEED CONDUCTOR DEPTH WELL: 02-32C 12/21/99 CTD SIDETRACK (02-32A) 11/28/14 JLS/PJC GLV CIO PERIM'No: `2141170 03/06/02 D-16 RIG SIDETRACK(02-328) 11/29/14 NLW/PJ SET D&D LTPw/X NP AR No: 50-029-22209-03 11/07/141N0RIJC2 CTD(02-32C) 12/02/14 PJC CONDUCTOR CORRECTION SEC 25,T11 N,R14E 23'FSL 8 740'FWL 11/10/14 JMD DFRLG HD CORRECTIONS 11/10/14 NS/JMD FNAL ODEAPPROVAL BP Exploration(Alaska) North America-ALASKA-BP Page 1 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:10/18/2014 End Date:11/3/2014 X3-015N1 (4,197,222.00) -----I� Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING @69.00usft(above Mean Sea Level) Date From-To Hrs I Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10/18/2014 00:00 - 02:30 2.50 MOB P I PRE START UP 3RD MOTOR. BLEED DOWN OA FROM 220PSI TO 0 IN 1 MIN. SPIN TIRES&WARM UP MOVING SYSTEM. DISCONNECT TIGER TANK LINE. PJSM FOR MOVING OFF WELL. ENSURE ALL TREE VALVES ARE CLOSED& FLAGGED.JACK UP RIG&MOVE OFF OF WELL 01-15. 02:30 - 03:30 1.00 MOB P PRE CLEAN UP AROUND WELL HEAD. PLACE RIG MATS ON TRAILER.PERFORM ROUTE DRIVE WITH TOURPUSHER&DRILLER.PJSM FOR DRIVING TO NEXT LOCATION. 03:30 - 08:00 4.50 MOB P PRE MOVE RIG FROM DS 1 TO DS 2. 08:00 - 09:00 1.00 MOB P PRE PJSM.SET UP RIG MATS AROUND 02-32 WELL. 09:00 - 10:00 1.00 MOB P PRE PJSM. MOVE RIG ONTO 02-32 WELL. SHIM T-MATS.SET RIG DOWN. -ACCEPT RIG AT 10:00 ON 10/18/2014 10:00 - 11:30 1.50 MOB P PRE 'BERM UP CELLAR.RU SSV.INSTALL GUARDS ON IA AND OA. SPOT ANCILLARY EQUIPMENT. 11:30 - 12:30 1.00 BOPSUR P PRE OPEN TREE VALVES TO WING VALVE FOR THERMAL EXPANSION.RU TO WING VALVE AND LEAK TIGHT TEST TREE VALVES. 12:30 - 15:30 3.00 BOPSUR P PRE PJSM.ND TREE CAP.NU BOPE. 15:30 - 15:45 I 0.25 BOPSUR P PRE HELD RIG EVAC DRILL WITH FIRE AND AAR. 15:45 - 17:45 2.00 BOPSUR P PRE SHELL TEST BOP -TAKE BOP STACK MEASUREMENTS FROM RKB. -GREASE MUD CROSS. -FILL STACK WITH WATER -SHELL TEST 250 PSI/4500 PSI Printed 11/17/2014 9:59:13AM North America-ALASKA-BP Page 2 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date:11/3/2014 X3-015N1 (4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING @69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:45 - 00:00 6.25 BOPSUR P PRE 24 HR NOTICE FOR BOP TEST GIVEN 07:37 ON 10/17/2014 BOP TEST WITNESS WAS WAVED BY AOGCC INSPECTOR BOB NOBLE AT 07:58 ON 10/17/14. PRESSURE TEST ALL BOP EQUIPMENT AS PER AOGCC REGS AND CRT-AK-10-45 -TEST BOPE TO 250/3500 PSI FOR 5/5 CHARTED MIN -TEST CHOKE VALVES,CHOKE AND KILL HCR VALVES,INSIDE MANUAL VALVES ON CHOKE AND KILL LINES,BOP RAMS AND ANNULAR PREVENTER -LOWER 2-3/8"PIPE RAMS TESTED WITH 2-3/8"TEST JOINT -VBR TESTED WITH BOTH 2-3/8"AND 3-1/2" TEST JOINT -UPPPER 2-3/8"PIPE RAMS TESTED WITH 2-3/8"TEST JOINT -ANNULAR TESTED WITH BOTH 2-3/8"AND 3-1/2"TEST JOINT -TEST FULL OPENING SAFETY VALVE -FUNCTION BOPE FROM BOTH REMOTE PANELS -TEST GAS ALARMS -PERFORM DRAW DOWN TEST OF ACCUMULATOR -ALL TESTS WITNESS OR REVIEWED BY TOOLPUSHER,WSL. 10/19/2014 00:00 - 01:00 1.00 BOPSUR P PRE CONTINUE TO TEST BOPE. 01:00 - 04:00 3.00 BOPSUR P PRE TEST LOCKDOWNS ON BOPE. 04:00 - 05:25 1.42 BOPSUR P PRE PUMP 5BBLS OF NEET METHANOL FORLLOWED BY 100 DEG F 8.3PPG FRESH WATER INTO REEL AT 1BPM.PU INJECTOR&STAB ONTO WELL.CONTINUE TO FILL COIL. 05:25 - 05:40 0.25 BOPSUR P PRE EVAC RIG!GOOD DRILL. 05:40 - 06:30 0.83 BOPSUR P PRE TEST INNER REEL&PACK OFF. 06:30 - 11:00 4.50 STWHIP P WEXIT PERFORM E-LINE SLACK MANAGEMENT. -PUMP SLACK INTO REEL. -CUT 250'OF COIL. -MU CTC,PULL AND PREASSURE TEST 35KLBS 250/3800 PSI. -GET ON WELL. -PUMP SLACK FORWARD. -PT LUBRICATOR 250/3500 PSI. POP OFF.HEAD UP BHI. 11:00 - 12:00 1.00 STWHIP P WEXIT PJSM OPEN AND FLOWCHECK WELL. -INSTALL AND PT NIGHT CAP. -OPEN TREE VALVES W/0 PSI WHP. -OPEN CHOKE LINE HCR AND FLOWCHECK- NO FLOW. CHECK TORQUE ON TREE BOLTS. Printed 11/17/2014 9:59:13AM • North America-ALASKA-BP Page 3 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date:11/3/2014 X3-015N1 (4,197.222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor.NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING ©69.O0usft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 12:00 - 13:15 1.25 STWHIP P WEXIT PJSM MU MILLING BHA. -GAUGE MILLS. -WINDOW MILL:3.81"GO/3.80"NO-GO -STRING MILL:3.81"GO -STAB COIL. -GET ON WELL/TEST QTS 250/3500 PSI 13:15 - 16:00 2.75 STWHIP P WEXIT RIH W/MILLING BHA AT 100 FPM TO 9230'MD. -1.64 BPM IN TAKING ALL RETURNS TO TIGER TANK. -GAS CUT RETURNS STARTING AT-1800'MD. -LOG TIE-IN W/+8'CORRECTION. -MANUAL STRAPS OF TIGER TANK EVERY 1000'MATCH CALCULATED DISPLACEMENT. 16:00 - 17:30 1.50 I STWHIP P WEXIT DISPLACE WELL F/8.4 PPG KCL TO 9.5 PPG POWER-PRO. -3.10/3.05 BPM IN/OUT. -TAKE SLOW PUMP RATES • -TAG TOWS AT 9257.5'MD. 17:30 - 19:50 2.33 STWHIP P WEXIT, TIME MILL WINDOW F/9257.5'AS PER WELL PLAN. -2.72/2.72 BPM IN/OUT 9.52PPG MW IN/OUT 2725 PSI CIRC PRESS. 0.5-1.1KLBS WOB 10.37PPG ECD.IAP=37PS1.OAP=7PSI. 74DEG F IN/OUT PVT=305 MILL TO 9259.4' 19:50 - 20:55 1.08 STWHIP P WEXIT 6+BPM LOST RATE. PUH.PUW=44K-CLEAN PICK UP. OPEN EDC,SLOWLY PUH,PUMP 3.25BPM DOWN COIL& 3.25BPM DOWN BACKSIDE-NO RETURNS. I LOST 4OBBLS IN 10MIN&FINALLY CAUGHT RETURNS. MAKE NOTIFICATIONS&GET ORGANIZED. CONTINUE TO SLOWLY PUH.CALL FOR FLUID SUPPORT. DOUBLE VIS UP 45BBLS IN PIT 5 USING 2 BUCKETS OF FLO-VIS.290BBLS OF USED 9.5PPF MUD VAC TRUCK ON LOCATION.970BBLS OF USED 9.5PPG MUD AT MI-SWACO. ORDER SECOND SUPPORT TRUCK FROM WELL SUPPORT. 20:55 - 21:05 0.17 STWHIP , P WEXIT STOP PUH.CLOSE EDC.FLOW CHECK-NO FLOW.BLOW 'DOWN KILL LINE,CLOSE KILL HCR.PVT=218 ORDER NEW SKELETON 9.5PPG MUD SYSTEM FROM MI (NO LUBES). 21.05 - 21:15 0.17 STWHIP P WEXIT RIH.PVT=216 CIRCULATE THRU MILL USED MUD 9.5PPG WHILE RIH, 5BBLS TO FILL HOLE. 2560PSI CTP AT 2.8BPM IN/2.26BPM OUT IAP=38PSI,OAP=7PSI. Printed 11/17/2014 9:59.13AM North America-ALASKA-BP Page 4 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:10/18/2014 End Date:11/3/2014 X3-015N1 (4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor.NORDIC CALISTA I UWI:500292220900 Active datum:ORIG KELLY BUSHING i69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:15 - 00:00 2.75 STWHIP P WEXIT CONTINUE TO TIME MILL WINDOW F/9259.4' AS PER WELL PLAN. 2.78/2.27 BPM IN/OUT 9.52PPG MW IN/OUT 2578 PSI CIRC PRESS(100-175PSI MW). 1.1-2.8KLBS WOB 10.37PPG ECD.IAP=39PSI.OAP=9PSI. 77DEG F IN/76DEG F OUT PVT=205(BEGIN FILLING NON ACTIVE PITS) LOSSES INCREASED AT 9260.2'FROM 0.25BPM TO 1.5BPM &SLOWLY HEALED MILL TO MIDNITE DEPTH OF 9261.4' PVT=287 10;20/2014 00:00 06:00 6.00 STWHIP P WEXIT CONTINUE TO TIME MILL WINDOW F/9261.5' AS PER WELL PLAN. 2.78/2.60 BPM IN/OUT 9.52PPG MW IN/OUT 2578 PSI CIRC PRESS(100-200PSI MW). 1.1-2.8KLBS WOB 10.37PPG ECD.IAP=39PSI.OAP=9PSI. 85DEG F IN/85DEG F OUT PVT=287 - MILL TO 9266.5'MD 06:00 - 08:45 2.75 STWHIP P WEXIT MILL RATHOLE F/9266.5'-9281'MD -BPM IN/OUT:2.75/2.75 -CIRC PSI:2350 -ECD:10.10 PPG -MW IN/OUT:9.48 PPG/9.44 PPG -IA/OA/PVT:225 PSI/76 PSI/396 BBLS -WOB:0.5-1.0K# -TIME MILL FIRST 2'TO GET STRING REAMER THROUGH WINDOW 08:45 - 10:15 1.50 STWHIP P WEXIT DRESS WINDOW -REAM DOWN AND UP 3X AT 1'/MIN -DRY DRIFT WINDOW,WINDOW SMOOTH 10:15 - 12:15 2.00 STWHIP P WEXIT POOH WITH MILLING ASSEMBLY -FLOW CHECK OFF BOTTOM,NO FLOW -100'/MIN WITH 2.33/1.73 BPM IN/OUT 12:15 - 12:45 0.50 STWHIP P WEXIT PJSM.UD MILLING BHA. -GAUGE MILLS. -WINDOW MILL:3.80"GO/3.79"NO-GO -STRING MILL:3.80"GO 12:45 - 13:15 0.50 DRILL P PROD1 PJSM.M/U 4-1/4"BUILD BHA. -PU 2-7/8"ULS MOTOR. -MU USED 3.75"X 4-1/4"HYC SRH3611 M-B4 BIT SN:A173358 -RIH W/MOTOR AND BIT. -M/U MWD/LWD STRING TO TOP OF MOTOR. AND RIH. 13:15 16:30 3.25 DRILL P PROD1 STAB COIL.GET ON WELL.TEST QTS 250/3500 PSI.RIH W1 4-1/4"BUILD BHA F/83' TO 9281'MD. -100'/MIN WITH 0.64/1.11 BPM IN/OUT. -LOG TIE-IN W/-4'CORRECTION • Printed 11/17/2014 9:59:13AM North America-ALASKA-BP Page 5 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date:11/3/2014 X3-015N1(4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING @69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:30 - 18:45 2.25 DRILL P PROD1 DRILL 4-1/4"BUILD SECTION F/9281' -BPM IN/OUT:2.71/2.68 -CIRC PSI:2732 -ECD:10.44 PPG -MW IN/OUT:9.52 PPG/9.48 PPG -IA/OA/PVT:50 PSI/15 PSI/215 BBLS -DHWOB:0.87K# DRILL TO 9343' OBTAIN SPR'S 18:45 - 19:00 0.25 DRILL P PROD1 PICK UP&BIT STUCK.CYCLE COIL TWICE& POPPED FREE.-12K WOB.PUH&DISCUSS. WIPE TO BOTTOM OF WINDOW&BACK TO TD. 19:00 - 23:45 4.75 DRILL P PROD1 TAG 4'HIGH DUE TO WEIGHT SQUAT.9345' SAMPLE WAS 70%CLAY,REST SHALE DRILL 4-1/4"BUILD SECTION F/9343' -NBI 77DEG -ROP 1-25'/HR -BPM IN/OUT:2.85/2.80 -CIRC PSI:2700 FREE SPIN -ECD:10.49 PPG -MW IN/OUT:9.54 PPG/9.48 PPG -IA/OA/PVT:50 PSI/17 PSI/214 BBLS -DHWOB:1.87K LBS-4.5K LBS -87DEG F IN/87DEG F OUT MULTIPLE STALLS,CLEAN PICK UP FIRST CLEAN SURVEY AT 9350',ON COURSE &ON TARGET. DRILL TO 9462' PVT 205 23:45 - 23:50 0.08 DRILL P PROD1 100'WIPER 2.75BPM 2662CTP 38K PUW.27K RIW. 23:50 - 00:00 0.17 DRILL P PROD1 DRILL 4-1/4"BUILD SECTION F/9462' -NBI 82DEG ROP 25-50'/HR -BPM IN/OUT:2.77/2.80 -CIRC PSI:2688 FREE SPIN -ECD:10.58 PPG -MW IN/OUT:9.53 PPG/9.55 PPG -IA/OA/PVT:52 PSI/27 PSI/206 BBLS -DHWOB:1.87K LBS-4.5K LBS -92DEG F IN/89DEG F OUT DRILL TO 9463' PVT 205 10/21/2014 00:00 - 09:00 9.00 DRILL P PROD1 DRILL4-1/4"BUILD SECTION F/9463' -NBI 82DEG -ROP 25-50'/HR -BPM IN/OUT:2.77/2.80 -CIRC PSI:2688 FREE SPIN -ECD:10.58 PPG -MW IN/OUT:9.53 PPG/9.55 PPG -IA/OA/PVT:52 PSI/27 PSI/318 BBLS (ADDED PIT 1 TO ACTIVE) -DHWOB:1.87K LBS-4.5K LBS -92DEG F IN/89DEG F OUT PVT 353 TURN ON CENTRIFUGES PUMP 25BBLS HI-VIS PILL. DRILL TO 9570' Printed 11/17/2014 9:59:13AM North America-ALASKA-BP Page 6 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date:11/3/2014 X3-015N1 (4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING t 69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 11:00 2.00 I DRILL P PROD1 POH W/BUILD BHA FOR BIT F/9570'. 1-25 FPM F/9570'TO 9230' -2.80/2.63 BPM IN/OUT FLOWCHECK AND OPEN EDC -95 FPM F/9230'TO 83'. FLOW CHECK 11:00 - 12:00 1.00 DRILL P PROD1 INSPECT/CHANGE BIT STAND INJECTOR BACK -INSPECT BIT/MOTOR/MWD TOOLS BIT GRADE 1-1,BALLED UP,3 PLUGGED NOZZLES -MU HUGHES BIT/DIRECTIONAL TOOLS(NO AKO CHANGE) -GET ONTO WELL WITH INJECTOR -PRESSURE TEST QTS 250/3500(PASSED) 12:00 - 15:15 3.25 DRILL P PROD1 RIH WITH BUILD BHA F/83'-8500'MD. -LOG LONG TIE-IN F/8450-8550'MD 1-DEPTH CORRECTION(-3.5') RIH TO BOTTOM 9570'MD 15'15 - 19 00 3.75 DRILL P PROD1 DRILL AHEAD F/9,570'-9625'MD -BPM IN/OUT:2.73/2.73 CIRC PSI:2750 -MW IN/OUT:9.48 PPG/9.50 PPG [-IA/OA/PVT:59/28/356 DHWOB:1.0K LBS-1.75K LBS -ECD:10.48 -DRILL TO 9655' 19 00 - 19:10 0.17 DRILL P PROD1 PUH FOR BHA WIPER. 2.78BPM/2878PSI. OBTAIN SPR'S. PUMP#1 2.7/1/0.5 BPM 2596/1128/886 PSI PUMP#2 2.7/1/0/5 BPM 2560/1146/894 PSI 19:10 - 21:00 1.83 - DRILL P PROD1 CONTINUE TO DRILL 4-1/8"BUILD SECTION F/ 9655' -NBI 86DEG ROP 15-30'/HR -BPM IN/OUT:2.72/2.78 -CIRC PSI:2878 FREE SPIN (100-300PSI MW) -ECD:10.66 PPG -MW IN/OUT:9.48 PPG/9.46 PPG I-IA/OA/PVT:61 PSI/31 PSI/354 BBLS -DHWOB:1.87K LBS-4.5K LBS -96DEG FIN/94DEG F OUT DRILL TO 9694' 'PVT 349 21:00 - 21 05 0.08 DRILL P PROD1 OUT MM KEEPS PLUGGING UP(OBSERVED PER TOTCO ALARMS-LOSS OF OUT MM& HIGH WHP),APPEARS TO BE DECENT SIZED SHALE PIECES.COLLECT FOR GEO- APPEARS TO BE FROM 9350-9400'.PUMP 15BBL LOW VIS SWEEP. Printed 11/17/2014 9 59.13AM North America-ALASKA-BP Page 7 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) • Start Date: 10/18/2014 End Date:11/3/2014 X3-015N1 (4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release: 11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING(g69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:05 - 21:15 0.17 DRILL P PROD1 CONTINUE TO DRILL 4-1/8"BUILD SECTION F/ 9694' -NBI 890EG -ROP 80-110'/HR -BPM IN/OUT:2.80/2.80 -CIRC PSI:2878 FREE SPIN (100-300PSI MW) -ECD:10.56 PPG -MW IN/OUT:8.48 PPG/9.45 PPG -IA/OA/PVT:57 PSI/33 PSI/363 BBLS -DHWOB:2.87K LBS-6.5K LBS -96DEGFIN/94DEGFOUT DRILL TO 9722' PVT 363 ' 21:15 - 21:20 0.08 DRILL P PROD1 STACKED OUT,LOST MW.100'WIPER.38K PUW,26K SOW-SEEMS.CLEAN. CIRC AT 2.8BPM/2823PSI. (TOTCO ALARM-LOSS OF OUT MM&HIGH WHP)BLOW DOWN OUT MM.PRIOR TO BLOW BACK-DECENT AMOUNT OF MUSHY CLAY BALLS/PATTIES&CUTTINGS COMING OVER THE SHAKER. 21:20 - 22:10 0.83 DRILL P PROD1 •CONTINUE TO DRILL 4-1/8"BUILD SECTION F/ 9722' •-NBI 89DEG -ROP 80-110'/HR -BPM IN/OUT:2.80/2.80 -CIRC PSI:2878 FREE SPIN (100-300PSI MW) -ECD:10.68 PPG -MW IN/OUT:9.48 PPG/9.45 PPG -IA/OA/PVT:60 PSI/33 PSI/363 BBLS -DHWOB:2.87K LBS-6.5K LBS -96DEG FIN/94DEG F OUT DRILL TO 9768' PVT 360 22:10 - 22:15 0.08 DRILL P PROD1 STACKED OUT,LOST MW.100'WIPER.38K PUW,26K SOW-SEEMS CLEAN. CIRC AT 2.8BPM/2823PSI. PUMP 15BBL LO VIS PILL _ 22:15 - 23:15 1.00 DRILL P PROD1 CONTINUE TO DRILL 4-1/8"BUILD SECTION F/ 9768' -NBI 88DEG -ROP 90-110'/HR -BPM IN/OUT:2.75/2.75 CIRC PSI:2700 FREE SPIN (100-300PSI MW) -ECD:10.49 PPG(OBD) -MW IN/OUT:9.47 PPG/9.45 PPG -IA/OA/PVT:60 PSI/35 PSI/375 BBLS -DHWOB:2.87K LBS-6.5K LBS -96DEG F IN/94DEG F OUT DRILL TO 9836' PVT 373 23:15 - 23:30 0.25 DRILL P PROD1 STACKED OUT,LOST MW.100'WIPER.39.5K PUW,24K SOW-SEEMS CLEAN.CIRC AT 2.8BPM/2648PSI. Printed 11/17/2014 9:59:13AM North America-ALASKA-BP Page 8 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date:11/3/2014 X3-015N1 (4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING©69.0ousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:30 - 00:00 0.50 DRILL P PROD1 CONTINUE TO DRILL 4-1/8"BUILD SECTION F/ 9836' -NBI 89DEG -ROP 95-110'/HR BPM IN/OUT:2.70/2.75 -CIRC PSI:2648 FREE SPIN (100-300PSI MW) -ECD:10.49 PPG(OBD) -MW IN/OUT:9.50 PPG/9.50 PPG -IA/OA/PVT:60 PSI/40 PSI/373 BBLS -DHWOB:2.87K LBS-3.5K LBS -99DEG F IN/94DEG F OUT DRILL TO MIDNITE DEPTH OF 9860' PVT 372 10/22/2014 00:00 - 00:50 0.83 DRILL P PROD1 CONTINUE TO DRILL 4-1/8"BUILD SECTION F/ 9860' -NBI 89DEG -ROP 50-75'/HR -BPM IN/OUT:2.70/2.75 -CIRC PSI:2618 FREE SPIN (100-300PSI MW) -ECD:10.49 PPG(OBD) -MW IN/OUT:9.50 PPG/9.47 PPG -IA/OA/PVT:62 PSI/43 PSI/371 BBLS -DHWOB:2.87K LBS-3.5K LBS -98DEG FIN/95DEG F OUT DRILL TO 9898' PVT 369 00:50 - 01:20 0.50 DRILL P PROD1 CONTINUE TO DRILL 4-1/8"BUILD SECTION F/ 9898' INCREASE PUMP RATE TO 3.OBPM -NBI 87DEG -ROP 90-130'/HR -BPM IN/OUT:3.0/2.96 -CIRC PSI:3036 FREE SPIN (100-300PSI MW) -ECD:10.49 PPG(OBD) -MW IN/OUT:9.53 PPG/9.48 PPG -IA/OA/PVT:62 PSI/42 PSI/369 BBLS -DHWOB:1.00K LBS-2.5K LBS -98DEG F IN/96DEG F OUT DRILL TO 9947' PVT 368 01:20 - 02:00 0.67 DRILL P PROD1 PUMP 30 BBL LO-VIS CONTINUE TO DRILL 4-1/8"BUILD SECTION F/ 9947' -NBI 87DEG -ROP 90-110'/HR -BPM IN/OUT:3.05/3.04 -CIRC PSI:3036 FREE SPIN (100-300PSI MW) -ECD:10.49 PPG(OBD) -MW IN/OUT:9.48 PPG/9.52 PPG -IA/OA/PVT:62 PSI/42 PSI/368 BBLS -DHWOB:0.50K LBS-1.5K LBS -98DEG F IN/96DEG F OUT DRILL TO BUILD SECTION TD AT 10,000' 1PVT 398 02:00 - 02:15 0.25 DRILL P PROD1 TD BUILD SECTION AT 10,000' WIPER TO 9500'AT 30'/MIN. PUW=40K.CIRC AT 3BPM/2995PSI.CLEAN PU.9580'7K OP.MW AT 9500'.STEADY INCREASE IN CUTTINGS FROM 3OBBL SWEEP. PVT 398 Printed 11/17/2014 9:59:13AM • North America-ALASKA-BP Page 9 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date:11/3/2014 X3-015N1 (4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor.NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING©69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT I NPT Depth Phase Description of Operations (hr) (usft) 02:15 - 02:35 0.33 DRILL P PROD1 'WIPER TO 10,000'FROM 9500'AT 20'/MIN. RIW=27K.CIRC AT 3BPM/3062PSI. PVT 398 02:35 - 03:00 0.42 DRILL P PROD1 WIPER TO THE WINDOW FROM 10,000'AT 23'/MIN-CLEAN PU. PUW=39K.CIRC AT 3BPM/3111 PSI.7K OP AT 9590'.15K OP WITH MW AT 9510'. 03:00 - 03:10 0.17 DRILL P PROD1 PULL THRU WINDOW-CLEAN.FLOW CHECK -NO FLOW. 03:10 - 03:25 0.25 DRILL P PROD1 OPEN EDC.PUH TO 8000'.3.5BPM/2940PSI CTP.LARGE AMOUNTS OF PINKY NAIL SIZED GRAVEL GOING OVER SHAKER.OUT MM KEEPS PLUGGING UP. 03 25 - 03:50 0.42 DRILL P PROD1 PUH TO 8000'.3.5BPM/2874PSI CTP.AMOUNT OF CUTTINGS HAS REDUCED BUT STILL GETTING SOME GRAVEL COMING BACK 03 50 - 03:55 0.08 DRILL P PROD1 RIH TO ABOVE WINDOW AT 100'/MIN,3.45BPM IN 4.5 BPM OUT.OUT MM&BYPASS PLUGGING CONSTANTLY 03:55 - 04:05 0.17 DRILL P PROD1 RIH TO ABOVE WINDOW AT 100'/MIN,3.45BPM IN 4.5 BPM OUT.OUT MM&BYPASS PLUGGING CONSTANTLY.WINDOW METAL COMING BACK TOO. 04:05 - 07:00 2.92 DRILL P PROD1 POH FOR LATERAL BHA.PUH AT 20'/MIN 3.47BPM/2882PSI CTP.RETRUNS CLEANED UP,INCREASE POH SPEED TO 50'/MIN AT 8700'.INCREASE POH SPEED AT 6800'TO 1 75'/MIN.CUTTINGS CONTINUED COMING ACROSS SHAKERS ALL THE WAY TO SURFACE.TAG UP AND JOG DOWN TO 300' MD. -FLOW CHECK 07:00 - 08:00 1.00 DRILL P PROD1 j CHANGE BHA/PU LATERAL BHA STAND INJECTOR BACK -LD DIRECTIONAL MOTOR/MWD TOOLS -GRADE BIT(1-1) -MU BHI 3-1/8"DIRECTIONAL MOTOR/MWD TOOLS(RE-RUN SAME HUGHES BIT) -GET ONTO WELL WITH INJECTOR -PRESSURE TEST QTS 250/3500(PASSED) 08:00 - 11:30 3.50 DRILL P PROD1 RIH WITH 4-1/8"LATERAL ASSEMBLY -BPM IN/OUT:1.9/2.44 CIRC PSI:1344 -MW IN/OUT:9.47 PPG/9.46 PPG -IA/OA/PVT:62/32/327 -LOG TIE-IN(-5')DEPTH CORRECTION -LOG CCL DOWN FROM 8900'-9000'MD -CONTINUE RIH TO BOTTOM -REDUCE PUMP RATES F/9450'9600'MD(NO ISSUES) 11:30 - 13:30 2.00 DRILL P PROD1 DRILL 4-1/8"LATERAL SECTION F/10,000'- 10,123'MD -BPM IN/OUT:2.73/2.73 CIRC PSI:2750 -MW IN/OUT:9.48 PPG/9.50 PPG -IA/OA/PVT:59/28/375 -DHWOB:1.0K LBS-1.75K LBS -ECD:10.48 13:30 - 14:00 0.50 DRILL P PROD1 PERFORM BHA WIPER F/10,123'-10,000'MD 1-TROUBLESHOOT MWD TOOL -LOST DWVVOB&PWD SENSOR -DECISION MADE TO POOH FOR MWD FAILURE Printed 11/17/2014 9:59:13AM • • North America-ALASKA-BP Page 10 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date:11/3/2014 X3-015N1 (4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:OOAM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING @69.O0usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 16:30 2.50 DRILL N DFAL 10,123.00 PROD1 PREPARE TO POOH TO CHANGE TOOLS -PUMP 30 BBLS LOW VIS SWEEP TO BIT -POOH F/10,123'-9200'MD.(CLEAN PU THRU SHALE INTERVAL) -FLOW CHECK(NO FLOW) -OPEN EDC PUMP MAX RATE CHASING CUTTING OUT -BPM IN/OUT:3.15/2.50 MW IN/OUT:9.47 PPG/9.42 PPG -IA/OA/PVT:68/38/400 16:30 - 17:40 1.17 DRILL N DFAL 10,123.00 PROD1 CHANGE OUT MWD TOOLS -FLOW CHECK(NO FLOW) -STAND BACK INJECTOR -CHANGE OUT MWD TOOLS -INSPECT BIT AND MOTOR(GOOD CONDITON-NO CHANGES) -GET ONTO WELL WITH INJECTOR -PRESSURE TEST QTS 250/3500(PASSED) 17:40 - 19:20 1.67 DRILL N DFAL 10,123.00 PROD1 RIH. CIRC AT 3.45BPM/2833PSI CTP. OUT MM PLUGGING ISSUES WHILE RIH. 19:20 - 20:20 1.00 DRILL N DFAL 10,123.00 ' PROD1 LOG DOWN FOR TIE-IN FROM 8550'. -CIRC AT 3.OBPM/2424PSI CTP. MINUS 5.5'CORRECTION. -CLOSE EDC. -CONTINUE RIH. 20:20 - 21:00 0.67 DRILL N DFAL 10,123.00 PROD1 WIPER TO TD -RIH PAST WINDOW W/OUT PUMPS 45ROHS- CLEAN -CIRCULATE 1BPM 1113PSI CTP FROM BOTTOM OF WINDOW TO 9700'-9509'TO 9550'SLIGHT MW&WT BOBBLE. -INCREASE PUMP RATE BELOW 9700'TO 2.89BPM/2880PS1-CLEAN TO TD -JORPS CSS AT 10,106'-PASS -OBTAIN SPR'S -PUMP#1 2.8/1/0.5 BPM 2732/1102/900 PSI -PUMP#2 2.8/1/0/5 BPM 2750/1102/899 PSI 21:00 - 00:00 3.00 DRILL P PROD1 CONTINUE TO DRILL 4-1/8"LATERAL SECTION F/10123' -NBI 87DEG -ROP 50-75'/HR -BPM IN/OUT:2.81/2.81 -CIRC PSI:2750 FREE SPIN (100-300PSI MW) -ECD:10.41 PPG(OBD) -MW IN/OUT:9.51 PPG/9.46 PPG -IA/OA/PVT:65 PSI/33 PSI/393 BBLS -DHWOB:1.87K LBS-3.5K LBS -95DEG F IN/92DEG F OUT FREQUENT PU'S,NO GRAVEL/SHALE COMING BACK DRILL TO MIDNITE DEPTH OF 10290' PVT 388 -CALL TRUCKS FOR MUD SWAP Printed 11/17/2014 9:59:13AM North America-ALASKA-BP Page 11 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date:11/3/2014 X3-015N1 (4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING @69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10/23/2014 00:00 - 00:40 0.67 DRILL P PROD1 CONTINUE TO DRILL 4-1/8"LATERAL SECTION F/10290' -NBI 87DEG -ROP 50-95'/HR -BPM IN/OUT:2.81/2.81 CIRC PSI:2761 FREE SPIN (100-300PSI M1Aft -ECD:10.51 PPG(OBD) -MW IN/OUT:9.52 PPG/9.49 PPG -IA/OA/PVT:72 PSI/40 PSI/388 BBLS -DHWOB:1.87K LBS-3.5K LBS -98DEG FIN/97DEG F OUT FREQUENT PUS DRILL TO 10318' PVT 388 SLIDE ISSUES 00:40 - 01:00 0.33 DRILL P PROD1 500'WIPER DUE TO SLIDE ISSUES -CIRC AT 2.8BPM/2800PSI. PVT 388 01:00 - 01:10 0.17 DRILL P PROD1 WIPER TO TD. -CIRC 2.8BPM/2926PSI PVT 384 _ 01:10 02:35 1.42 DRILL P PROD1 CONTINUE TO DRILL 4-1/8"LATERAL SECTION F/10318' -NBI 89DEG -ROP 50-95'/HR 1-BPM IN/OUT:2.81/2.81 CIRC PSI:2794 FREE SPIN (100-300PSI MW) ECD:10.51 PPG(OBD) -MW IN/OUT:9.52 PPG/9.49 PPG -IA/OA/PVT:72 PSI/40 PSI/385 BBLS 1 -DHWOB:1.87K LBS-3.5K LBS -99DEG F IN/98DEG F OUT 1 FREQUENT PU'S -SUCK DOWN PITS FOR FLUID SWAP. DRILL TO 10449' 02:35 - 03:05 0.50 DRILL P PROD1 GEO WIPER TO 10000'. -CIRC AT 2.8BPM/2815PSI. 03:05 - 03:55 0.83 DRILL P PROD1 WIPER TO TD FROM 10000'. -CIRC 2.74BPM/2880PSI 03:55 - 04:25 0.50 DRILL P PROD1 CONTINUE TO DRILL 4-1/8"LATERAL SECTION F/10449' -NBI 90DEG ROP 105'/HR -BPM IN/OUT:2.81/2.81 -CIRC PSI:2800 FREE SPIN (100-300PSI MW) -ECD:10.51 PPG(OBD) -MW IN/OUT:9.56 PPG/9.53 PPG -IA/OA/PVT:73 PSI/45 PSI/(CONDUCT MUD SWAP) -DHWOB:1.90K LBS-3.2K LBS -74DEGFIN/91DEGFOUT DRILL TO 10476' 04:25 - 05:25 1.00 DRILL P j PROD1 .WIPER TO WINDOW. CIRC 2.8BPM/2940PSI I REDUCE PUMP RATE TO 1BPM FRMO 9700' TO BASE OF WINDOW. 9625'APPEARS TO BE THE ISSUE WHEN THE ,CTC PASSES THRU THE SHALE SECTION FROM 9625'-9680',OTHERWISE CLEAN. 05:25 - 05:30 0.08 DRILL P PROD1 FLOW CHECK-NO FLOW. Printed 11/17/2014 9:59:13AM • • North America-ALASKA-BP Page 12 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) ' Start Date:10/18/2014 End Date: 11/3/2014 X3-015N1 (4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor NORDIC CALISTA UWI:500292220900 1 Active datum:ORIG KELLY BUSHING @69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:30 - 06:07 0.62 DRILL P PROD1 1 PUH TO 8500'AT 17'/MIN,CIRC AT 3.5BPM/3200PSI. BU WAS BORING. 06:07 - 06:40 0.55 DRILL P PROD1 LOG DOWN FOR TIE-IN FROM 8500'. 06:40 - 07:45 1.08 DRILL N WAIT 9,250.00 PROD1 TROUBLESHOOT BHI DEPTH ENCODER -LOGGED TIE-IN©8500'MD -RIH TO RA TAG,BHI DEPTH OFF 20' -CHANGE OUT DEPTH ENCODER/ RECALIBRATE 07:45 - 09:00 1.25 DRILL P PROD1 RIH F/9250'-10,476'MD -REDUCED PUMP RATE F/9400'-9700'@ 25 FPM -SLIGHT WEIGHT INCREASE AT 9625'MD -MW IN/OUT:9.55 PPG/9.57 PPG -IA/OA/PVT:72/34/375 09:00 - 10:00 1.00 DRILL P PROD1 DRILL 4-1/8"LATERAL SECTION F/10,476'- 10,575'MD • -BPM IN/OUT:2.77/2.75 CIRC PSI:3150 -MW IN/OUT:9.55 PPG/9.57 PPG -IA/OA/PVT:72/34/351 -DHWOB:1.0K LBS-3K LBS -ECD:10.61 10:00 - 10:15 0.25 DRILL P PROD1 PERFORM BHA WIPER F/10,575'-10,475'MD PU WEIGHT 62K(PULLED HEAVY OFF BOTTOM) -PUMP 19 BBLS LOW VIS PILL 10:15 - 10:45 0.50 DRILL P PROD1 DRILL 4-1/8"LATERAL SECTION F/10,575'- 10,629'MD -BPM IN/OUT:2.74/2.73 CIRC PSI:3170 -MW IN/OUT:9.57 PPG/9.55 PPG -1A/OA/PVT:72/34/374 I-DHWOB:1.0K LBS-3K LBS -ECD:10.61 10:45 - 10:50 0.08 DRILL P PROD1 PERFORM BHA WIPER F/10,629'-10,600'MD -PU WEIGHT 38K(NORMAL PU WEIGHT OFF BOTTOM) 10:50 - 11:15 0.42 DRILL P PROD1 DRILL 4-1/8"LATERAL SECTION F/10,629'- 10,648'MD BPM IN/OUT:2.74/2.73 CIRC PSI:3170 -MW IN/OUT:9.57 PPG/9.55 PPG -IA/OA/PVT:72/34/374 -DHWOB:1.0K LBS-3K LBS -ECD:10.61 -STARTING TO SEE ISSUES WITH CONTROLLING TOOLFACE 11:15 12:00 0.75 DRILL P PROD1 PERFORM BHA WIPER F/10,648'-10,450'MD -PU WEIGHT 41K(NORMAL PU WEIGHT OFF BOTTOM) 12:00 - 12:45 0.75 DRILL P PROD1 DRILL 4-1/8"LATERAL SECTION F/10,648'- 10,737'MD -BPM IN/OUT:2.71/2.70 CIRC PSI:3360 -MW IN/OUT:9.57 PPG/9.55 PPG -IA/OA/PVT:72/34/374 DHWOB:1.0K LBS-3.5K LBS ECD:10.61 CONTINUE TO SEE ISSUES WITH CONTROLLING TOOLFACE Printed 11/17/2014 9:59:13AM North America-ALASKA-BP Page 13 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date:11/3/2014 X3-015N1 (4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING©69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 12:45 - 16:30 3.75 DRILL P PROD1 PERFORM BHA WIPER F!10,737'-8,000'MD -PU WEIGHT 42K(NORMAL PU WEIGHT OFF BOTTOM) • -PUMPED 15 BBLS SWEEP -REDUCED RATES WHILE POH F/9700'-9450' MD -OPEN EDC AT WINDOW -PUMP MAX RATES F/9240'-8000'MD -RIH TO BOTTOM(NO ISSUES NOTED) 16:30 - 20:10 3.87 DRILL P PROD1 DRILL 4-1/8"LATERAL SECTION F/10,737' -BPM IN/OUT:2.81/2.80 CIRC PSI:3360 -MW IN/OUT:9.58 PPG/9.56 PPG -IA/OA/PVT:72/42/380 -DHWOB:1.0K LBS-3.5K LBS -ECD:10.61 -DRILL TO 10883' WELL BORE PACKING OFF,10K OP 10'OFF BOTTOM.STACKING WEIGHT TRYING TO GET TO BOTTOM. PUMP 15BBL LO-VIS PILL 20:10 - 21:00 0.83 DRILL P PROD1 WIPER TO WNDOW. CIRC 2.8BPM/2840PSI REDUCE PUMP RATE TO 1 BPM FRMO 9700' TO 9450'.10K OP&SLIGHT MW FROM 9650-9500'.INCREASE RATE TO 2.8BPM FROM 9450'TO BASE OF WINDOW.OUT&BYPASS PLUGGING. 21:00 - 21:05 0.08 DRILL P PROD1 FLOW CHECK-NO FLOW 21:05 - 22:50 1.75 DRILL P • PROD1 PUH TO 8000'AT 301MIN,CIRC AT 3.9BPM/3650PSI. PLUGGIN ISSUES ON BYPASS&OUT MM. RIH TO 9000'-OUT MM AT 4.5BPM(SEEMS TO BE KEY AT THIS RATE) REPEAT THIS ATTEMPT. 22:50 - 23:20 0.50 DRILL P PROD1 LOG DOWN FOR TIE-IN FROM 8500'.PLUS 5' CORRECTION.BACKFLUSH BYPASS,CHOKE LINES. 23:20 - 00:00 0.67 DRILL P PROD1 RIH.CIRC 2.42BPM/2460PSI WITH REDUCED RATE THRU 9400-9600' IORDER 3OBBL CEMENT PILOT TEST FOR JPOSSIBLE LINER CONTINGENCY. 10/24/2014 00:00 - 00:50 0.83 DRILL P PROD1 CONTINUE TO RIH.CIRC 2.42BPM/2460PSI 00:50 - 06:30 5.67 DRILL P PROD1 CONTINUE TO DRILL 4-1/8"LATERAL SECTION F/10884' -NBI 83DEG(POINTED DOWN) ROP 50-95'/HR -BPM IN/OUT:2.68/2.67 -CIRC PSI:2775 FREE SPIN (100-300PSI MW) -ECD:10.71 PPG(OBD) -MW IN/OUT:9.62 PPG/9.55 PPG IA/OA/PVT:68 PSI/49 PSI/380 BBLS -DHWOB:2.87K LBS-3.5K LBS -99DEG F IN/97DEG F OUT Printed 11/17/2014 9:59:13AM • North America-ALASKA-BP Page 14 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date:11/3/2014 X3-015N1 (4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING©69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT ! NPT Depth Phase Description of Operations (hr) (usft) 06:30 - 09:00 2.50 DRILL P PROD1 .DRILL 4-1/8"LATERAL SECTION F/10,973'- 11,007'MD -BPM IN/OUT:3.03/3.0 CIRC PSI:3350 -MW IN/OUT:9.55 PPG/9.54 PPG -IA/OA/PVT:72/70/378 -DHWOB:1.0K LBS-5K LBS ECD:10.76 "'HAVE ISSUES WITH SLIDING AND KEEPING WEIGHT ON BIT.CONSTANT NEED TO PICK-UP AND SET DOWN TO GET WEIGHT TRANSFERED TO BIT.DECISION MADE TO POOH FOR AGITATOR.GEOLOGY TEAMS NEEDS MORE DRILLED DATA BEFORE SIDETRACKING OPERATIONS. I***PUMP 25 BBLS LOW VIS SWEEP. 09:00 - 11:00 2.00 DRILL P PROD1 I POOH TO PICK UP AGITATOR F/11,007'-9240' MD PU OFF BOTTOM(42-45K) -BPM IN/OUT:3.0/2.82 CIRC PSI:3300 -MW IN/OUT:9.58 PPG/9.53 PPG -IA/OA/PVT:77/72/393 BBLS ECD:10.70 !'""NO OVER PULLS OR EXCESS DRAG WHILE POOH,,, 11:00 - 13:30 2.50 DRILL P PROD1 POOH F/9240'-0'MD -INCREASE PUMP RATES TO JET CASING -BPM IN/OUT:3.8/3.5 -MW IN/OUT:9.55 PPG/9.52 PPG -TAG UP AT SURFACE,JOG PACK TO 500'MD -CIRCULATE ACROSS TOP TO CLEAN OUT MICRO MOTION -FLOW CHECK 13:30 - 14:00 0.50 DRILL P PROD1 LD 4-1/8"DIRECTIONAL BHA -STAND INJECTOR BACK -BLOW DOWN DIRECTIONAL TOOLS -LD DIRECTIONAL TOOLS -GRADE BIT(1-1 BALLED UP,3 PLUGGED NOZZLES) '-MU RISER CAP 14:00 - 18:00 4.00 STWHIP N DPRB 11,007.00 PROD1 WAIT ON WHIPSTOCK FROM BTT -FUNCTION TEST BOPS 18:00 - 18:05 0.08 STWHIP N DPRB 11,007.00 PROD1 •FILL HOLE-5BBLS. 18:05 - 19:30 1.42 STWHIP N DPRB 1 11 007.00 PROD1 WAIT ON WHIPSTOCK FROM BTT. 19:30 - 19:40 0.17 STWHIP N DPRB 11 007.00 PROD1 PJSM FOR PU WHIPSTOCK SETTING BHA 19:40 - 20:20 0.67 STWHIP N DPRB 11,007.00 PROD1 HOIST BOT EQUIPMENT TO RF.HIGH SIDE WS SETTING BHA. MU WHIPSTOCK SETTING BHA.PLACE WS IN HOLE.MU COIL TRACK BHA TO WS SETTING BHA.MU INJECTOR TO BHA.STAB ONTO WELL. 20:20 - 20:30 0.17 STWHIP N DPRB 11,007.00 PROD1 PRESSURE TEST OTS.250PSI,4000PSI FOR 5 MIN. 20:30 - 23:35 3.08 STWHIP N DPRB 11,007.00 PROD1 RIH VNTH BHA#6,WHIPSTOCK SETTING BHA CIRC AT 0.25BPM/720PSI. REMOVE LOTO ON 02-01,PLACE LOCK ON WING VALVE. 23:35 - 00:00 0.42 STWHIP N DPRB 11,007.00 PROD1 LOG DOWN FOR TIE-IN FROM 8500'.MINUS 5' I CORRECTION. Printed 11/17/2014 9:59:13AM North America-ALASKA-BP Page 15 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date:11/3/2014 X3-015N1(4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING ci269.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10/25/2014 00:00 - 00:45 0.75 STWHIP N DPRB 11,007.00 PROD1 LOG DOWN FOR CCL ACROSS SET DEPTH. BOTTOM COLLAT AT 9054'.PUH TO SET DEPTH. 00:45 - 00:55 0.17 STWHIP N DPRB 11,007.00 PROD1 PRESSURE UP&SET WS.WS SET AT 0 DEG, TOP OF WS AT 9040'.EXIT POINT SHOULD BE 9049'.SET DOWN 3K ON WS. 00:55 - 03:00 2.08 STWHIP N DPRB 11,007.00 PROD1 FLOW CHECK AT 9200'-NO FLOW. POH,CIRC AT 1BPM/900PSI CTP. PJSM WHILE POH. 03:00 - 03:10 0.17 STWHIP N DPRB 11,007.00 PROD1 FLOW CHECK-NO FLOW. 03:10 - 03:45 0.58 STWHIP N DPRB 11,007.00 PROD1 POP OFF WELL,PLACE INJECTOR OVER BUNG HOLE&CIRC COIL. BLOW DOWN&BREAK DOWN BHI BHA IN HALF.LD BOT SETTING TOOL-ALL ITEMS OK _ &RECOVERED ALL BHA. 03:45 - 04:15 0.50 STMILL N DPRB 11,007.00 WEXIT MU WINDOW MILLING BHA. 3.80"GO,3.79"NO-GO ON MILLS. MU BHI COIL TRACK BHA. PU INJECTOR,INSPECT CTC-OK&MU TO BHA. STAB ONTO WELL. 04:15 - 04:25 0.17 STMILL N DPRB 11,007.00 WEXIT PRESSURE TEST QTS.250PSI/4000PSI FOR 5 MIN-PASSED. 04:25 - 05:55 1.50 STMILL N DPRB 11,007.00 WEXIT RIH WITH WINDOW MILLING BHA#7. CIRC AT 0.35BPM/568PSI CTP. •05:55 - 06:05 0.17 STMILL • N r DPRB 11,007.00 WEXIT LOG DOWN FOR TIE-IN FROM 8500'.MINUS 5' It CORRECTION. 06:05 - 06:20 0.25 STMILL N DPRB 11,007.00 WEXIT RIH&TAG PINCH POINT AT 9041.58'.GET SPR'S. PUMP#1 0.5/872 1/1100 2.5/2435 PUMP#2 0.5/875 1/1150 2.5/2440 06:20 - 17:00 10.67 STMILL N DPRB 11,007.00 WEXIT TIME MILL WINDOW 9041.2'-9050.1'MD. -2.61/2.61 BPM IN/OUT 9.56PPG MW IN/OUT 2549 PSI CIRC PRESS F.S.W/(100-300PSI MV . -0.5-3.1 KLBS WOB -10.51 PPG ECD.IAP=72PSI.OAP=I7PSI. 92DEG F IN/OUT -PVT=351 "`PERFORMED COMPLEX D2 WELL CONTROL DRILL:FULL LOSS OF RIG POWER/ PARTED KOOMEY HOSE TO UPPER COMBI'S. HELD AAR TO DISCUSS DRILL.NO DEFICENCIES NOTED. 17:00 - 22:35 5.58 STMILL N DPRB 11,007.00 WEXIT MI LL RATHOLE F/9050.1'-9060'MD -BPM IN/OUT:2.60/2.57 -CIRC PSI:2794 -ECD:10.45 PPG -MW IN/OUT:9.56 PPG/9.48 PPG -IA/OA/PVT:76 PSI/34 PSI/352 BBLS -WOB:3.9-5K# 22:35 - 23:50 1.25 STMILL N DPRB 11,007.00 WEXIT MAKE THREE UP/DOWN REAM PASSES AT 1'/MIN-CLEAN. DRY DRIFT-CLEAN. 23:50 - 00:00 0.17 STMILL N DPRB 11,007.00 WEXIT FLOW CHECK-NO FLOW. Printed 11/17/2014 9:59:13AM • North America-ALASKA-BP Page 16 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date:11/3/2014 X3-015N1 (4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM I Rig Release:11/7/2014 Rig Contractor.NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING @69.00usft(above Mean Sea Level) Date From-To Hrs Task Code I NPT NPT Depth Phase Description of Operations (hr) (usft) 10/26/2014 00:00 - 02:30 2.50 STWHIP . N DPRB 11,007.00 WEXIT POH WITH MILLING BHA.CIRC AT 2.8BPM/2500PSI CTP. PERFORMED COMPLEX WELL CONTROL DRILL:PIT GAIN,PIN HOLE,DOWN HOLE CHECK VALVES NOT HOLDING RESULTING IN DECISION TO SHEAR PIPE(NO HESITATION TO SHEAR PIPE FROM EITHER DRILLER). HELD AAR TO DISCUSS DRILL. DEFICENCIES NOTED(SCS NOT NOTIFIED,NON ESSENTIAL NOT CLEARED FROM RIG). PJSM WHILE POH FOR LD BHA. 02:30 - 02:35 0.08 STWHIP I N DPRB 11,007.00 WEXIT TAG UP&FLOW CHECK-NO FLOW. 02:35 - 03:00 0.42 STWHIP N DPRB 11,007.00 ' WEXIT POP OFF WELL&PLACE INJECTOR OVER I BUNG HOLE TO CIRC.LD BHA.MILK MOTOR- LOBES SEEM OK MILLS WERE 3.80"GO& 3.79"NO-GO.OFF LOAD BOT EQUIPMENT. i BLOW DOWN BHI TOOL STRING. 03:00 - 03:05 0.08 STWHIP P WEXIT CLEAN RIG FLOOR,PJSM FOR TESTING BARRIERS. -. 03:05 - 03:40 0.58 STWHIP P WEXIT CLOSE MASTER,SWAB,SSV.CONFIRM TURNS&STEM LENGTH.BARRIERS VERIFIED:"LEAK TIGHT ISOLATION,USING TWO OR MORE VALVES"PER ADWOP 10-36 •SECTION 6. 03:40 - 08:00 ' 4.33 STWHIP ' P WEXIT PJSM FOR OPENING RAM DOORS FOR BOP INSPECTION.MINOR DEBRIS INSIDE CAVITIES.VERY MINOR WEAR ON TOP SEAL OF BS RAM-REPLACE AS REQUIRED. 08:00 - 09:00 1.00 STWHIP P WEXIT SHELL TEST BOP SHACK -PRESSURE TEST 250 PSI/3500 PSI 09:00 - 16:00 7.00 STWHIP P WEXIT 24 HR NOTICE FOR BOP TEST GIVEN AT 21:00 ON 10/24/2014 BOP TEST WITNESS WAS WAVED BY AOGCC INSPECTOR JEFF JONES AT 20:10 ON 10/25/14. PRESSURE TEST ALL BOP EQUIPMENT AS PER AOGCC REGS AND CRT-AK-10-45 -TEST BOPE TO 250/3500 PSI FOR 5/5 CHARTED MIN TEST CHOKE VALVES,CHOKE AND KILL HCR VALVES,INSIDE MANUAL VALVES ON CHOKE AND KILL LINES,BOP RAMS AND ANNULAR PREVENTER -LOWER 2-3/8"PIPE RAMS TESTED WITH 2-3/8"TEST JOINT -VBR TESTED WITH BOTH 2-3/8"AND 3-1/2" TEST JOINT I-UPPER 2-3/8"PIPE RAMS TESTED WITH 2-3/8"TEST JOINT -ANNULAR TESTED WITH BOTH 2-3/8"AND 3-1/2"TEST JOINT 1-TEST FULL OPENING SAFETY VALVE -FUNCTION BOPE FROM BOTH REMOTE PANELS -TEST GAS ALARMS -PERFORM DRAW DOWN TEST OF ACCUMULATOR -ALL TESTS WITNESS OR REVIEWED BY TOOLPUSHER,WSL. Printed 11/17/2014 9:59:13AM • North America-ALASKA-BP Page 17 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 I End Date:11/3/2014 X3-015N1 (4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA U1M:500292220900 Active datum:ORIG KELLY BUSHING©69.0ousft(above Mean Sea Level) Date From-To Hrs Task Code i NPT NPT Depth Phase I Description of Operations (hr) (usft) 16:00 - 17:00 1.00 DRILL N DPRB 11,007.00 PROD1 PJSM.M/U 4-1/4"BUILD BHA. -PU 2-7/8"ULS MOTOR. -MU USED 3.75"X 4-1/4"HYC SRH3611M-B4 BIT SN:A173358 -RIH W/MOTOR AND BIT. -M/U MWD/LWD STRING TO TOP OF MOTOR, AND RIH. 17:00 - 18:30 1.50 DRILL N DPRB 11,007.00 PROD1 RIH W/4-14"BUILD BHA -BPM IN/OUT:0.65/1.13 CIRC PSI:637 -MW IN/OUT:9.45 PPG/9.45 PPG -1A/OA/PVT:72/10/298 18:30 - 18:55 0.42 DRILL N DPRB 11,007.00 PROD1 LOG DOWN FOR TIE-IN FROM 8500'.MINUS 6' CORRECTION. 18:55 - 19:10 0.25 • DRILL N DPRB 11,007.00 PROD1 CONTUNE TO RUH WITH DRILLING BHA. -BPM IN/OUT:0.65/1.13 CIRC PSI:637 -MW IN/OUT:9.45 PPG/9.45 PPG -IA/OA/PVT:72/10/340 CLOSE EDC AT 9020'. 19:10 - 00:00 4.83 DRILL N DPRB 11,007.00 PROD1 WET TAG AT 9059.8'.PUW 40K,RIW 25K I DRILL 4-1/8"BUILD SECTION F/9059.8' -NBI 54DEG -ROP 20-50'/HR -BPM IN/OUT:2.75.0/2.75 '-CIRC PSI:2783 FREE SPIN (100-300PSI MW) -ECD:10.51 PPG(OBD) -MW IN/OUT:9.53 PPG/9.4852PG -IA/OA/PVT:74 PSI/11 PSI/341 BBLS -DHWOB:0.50K LBS-1.5K LBS -87DEG F IN/77DEG F OUT DRILL TO MIDNITE DEPTH OF 9160' PVT 339 10/27/2014 00:00 - 00:15 0.25 DRILL N DPRB 11,007.00 PROD1 CONTINUE TO DRILL 4-1/8"BUILD SECTION F/ 9160' NBI 57DEG -ROP 20-30'/HR -BPM IN/OUT:2.75.0/2.75 CIRC PSI:2783 FREE SPIN (100-300PSI MW) -ECD:10.51 PPG(OBD) -MW IN/OUT:9.53 PPG/9.4852PG -IA/OA/PVT:74 PSI/11 PSI/341 BBLS -DHWOB:0.50K LBS-1.5K LBS -87DEG FIN/77DEG F OUT DRILL TO MIDNITE DEPTH OF 9165' PVT 339 00:15 - 00:40 0.42 DRILL N DPRB 11,007.00 PROD1 WIPER TO THE WINDOW-CLEAN. PUH INTO CASING.OPEN EDC&CIRCULATE PERFORMED COMPLEX WELL CONTROL DRILL:FIRST WELL ENTRY AFTER BOP TEST, RUN AWAY TO TD,PIT GAIN,PARTED WELLHEAD BELOW MASTER VALVE,GAS RELEASE TO CELLAR,RIG EVAC.GOOD RIG !EVAC,SIMULATED 3 MEN DOWN.HELD AAR TO DISCUSS DRILL.NO DEFICENCIES NOTED. Printed 11/17/2014 9 59 13AM North America-ALASKA-BP Page 18 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date: 11/3/2014 X3-015N1 (4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING @69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) 00:40 - 09:00 8.33 DRILL N DPRB 11,007.00 PROD1 CONTINUE TO DRILL 4-1/8"BUILD SECTION F/ 9165' -NBI 57DEG -ROP 20-30'/HR -BPM IN/OUT:2.75.0/2.75 -CIRC PSI:2783 FREE SPIN (100-300PSI MW) -ECD:10.51 PPG(OBD) -MW IN/OUT:9.53 PPG/9.4852PG -IA/OA/PVT:74 PSI/11 PSI/341 BBLS -DHWOB:0.50K LBS-1.5K LBS 87DEG F IN/77DEG F OUT FIRST GOOD SURVEY AT 9230' PUMP 2OBBL LO/HI VIS PILL AT 9290'.GOOD INCREASE IN AMT OF CUTTINGS ON BTMS I UP. DRILL TO 9495'MD PVT 378 09:00 - 12:00 3.00 DRILL N DPRB 11,007.00 PROD1 PERFORM WIPER TRIP TO WINDOW F/9495'- 9050'MD. -RIH PUMP 20 BBLS LOW VIS SWEEP 'II.-POOH TO WINDOW OPEN EDC. -BPM IN/OUT:3.85/3.5 -MW IN/OUT:9.62 PPG/9.53 PPG -IA/OA/PVT:76/35/375 "'CHASE CUTTINGS OUT OF HOLE. !CUTTINGS LOAD AT 60-70%OF DRILLED RATE F/9000'-6000'MD.CUTTING LOAD REDUCED TO 20%F/6000'-1000'MD.RATE REDUCED TO 3%AT SURFACE.JOG BACK DOWN TO 250'MD. "'MICRO MOTION PLUGGED OFF TWO TIMES WHILE POOH. 12:00 - 13:00 1.00 DRILL N DPRB 11,007.00 PROD1 LD FIRST BUILD BHA 1-FLOW CHECK(NO FLOW) -STAND INJECTOR BACK -LD DIRECTIONAL TOOLS/INSPECT MOTOR AND BIT -GRADE BIT(5-1 RINGING OUT,BROKEN TEETH) -MU SECOND BUILD BHA -SET INJECTOR ONTO WELL -PRESSURE TEST QTS 250/3500(PASS) 13:00 - 15:00 2.00 DRILL N DPRB 11,007.00 PROD1 RIH W/4-1/4"BUILD BHA -BPM IN/OUT:0.48/0.86 CIRC PSI:537 -MW IN/OUT:9.51 PPG/9.50 PPG -IA/OA/PVT:77/30/310 15:00 - 19:00 4.00 DRILL N DPRB 11,007.00 PROD1 LOG TIE-IN WITH(-6')DEPTH CORRECTION -LOG LONG TIE-IN FOR RA TAG.MINUS 6' CORRECTION.LOG DOWN ACROSS RA TAG. 19:00 - 19:30 0.50 DRILL N DPRB 11,007.00 PROD1 WIPER TO TD AT 1.5BPM/1430PSI.TAG UP AT 9085',REDUCE RATE TO 1 BPM THEN 0.5BPM THEN 0.25BPM FINALLY AT NO PUMPS.WORK TO TD USING THIS METHOD.SLOWLY& LIGHTLY TAG TD AT FULL PUMP RATE,NICE 'ABRUPT STALL AT TD. 19:30 - 19:50 0.33 DRILL N DPRB ' 11,007.00 PROD1 WIPER TO WINDOW AT FULL RATE 2.72BPM/2670PSI.OP&MWAT 9325'.OP& MWAT MULTIPLE MD'S NOW. Printed 11/17/2014 9:59:13AM • • North America-ALASKA-BP Page 19 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date: 11/3/2014 X3-015N1 (4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING t69.00usft(above Mean Sea Level) • Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 19:50 - 20:00 0.17 DRILL N DPRB 11,007.00 PROD1 WIPER TO TD&TO THW WINDOW-CLEANING UP,PUMP 2OBBLS OF LO&HI VIS PILLS. BOTTOMS UP IS MOSTLY CUTTINGS(NO CLAY BALLS OR METAL).I WOULD ASSUME UNDERGAUGE HOLE... 20:00 - 22:00 2.00 DRILL N DPRB 11,007.00 PROD1 CONTINUE TO DRILL 4-1/8"BUILD SECTION F/ 9495' -NBI 90DEG -ROP 90-130'/HR -BPM IN/OUT:2.75.0/2.75 -CIRC PSI:2607 FREE SPIN (100-300PSI MW) -ECD:10.47 PPG(OBD) MW IN/OUT:9.55 PPG/9.52PG -IA/OA/PVT:78 PSI/23 PSI/364 BBLS -DHWOB:1.50K LBS-2.5K LBS -94DEG F IN/91 DEG F OUT DRILL TO 9563' PVT 337 22:00 - 23:00 1.00 DRILL N DPRB 11,007.00 PROD1 SLIDING ISSUES.WIPER,ATTEMPT TO DRILL MORE FOOTAGE.CANT SLIDE. 23:00 - 00:00 1.00 DRILL N DPRB 11,007.00 PROD1 SWAP TO NEW MUD CONTINUE TO DRILL 4-1/8"BUILD SECTION F/ 9563' -NBI 9ODEG ROP 90-130'/HR -BPM IN/OUT:2.75.0/2.75 -CIRC PSI:2607 FREE SPIN (100-300PSI MW) -ECD:10.52 PPG(OBD) MW IN/OUT:9.53 PPG/9.45PG -IA/OA/PVT:78 PSI/23 PSI/9 BBLS -DHWOB:1.50K LBS-2.5K LBS 94DEG F IN/91 DEG F OUT I DRILL TO 9563' PVT 9 10/28/2014 00:00 - 02:10 2.17 DRILL N DPRB 11,007.00 PROD1 CONTINUE TO SWAP TO NEW MUD CONTINUE TO DRILL 4-1/8"BUILD SECTION Fl I 9563' NBI89DEG '-ROP 70-100'/HR -BPM IN/OUT:2.72.0/2.70 CIRC PSI:2926 FREE SPIN (100-300PSI MW) -ECD:10.52 PPG(OBD) -MW IN/OUT:9.53 PPG/9.45PG I-IA/OA/PVT:78 PSI/23 PSI/9 BBLS -DHWOB:1.50K LBS-2.5K LBS •-94DEG F IN/91DEG F OUT DRILL TO 9583' PVT 324 WON'T DRILL 02:10 - 02:30 0.33 DRILL N DPRB 11,007.00 PROD1 WIPER TO THE WINDOW,OP'S&MWAT VARIOUS DEPTHS&NEVER THE SAME DEPTH TWICE.PULL THRU WINDOW-CLEAN. JORPS-OK. 02:30 - 02:40 0.17 DRILL N DPRB 11,007.00 PROD1 STOP AT 9020'FLOW CHECK-NO FLOW. OPEN EDC. 02:40 - 04:05 1.42 DRILL N DPRB 11,007.00 PROD1 POH. CIRC AT 3.17BPM/2650PSI CTP. CLAY CLUMPS COMING OVER THE SHAKER. 04:05 - 04:10 0.08 DRILL N DPRB 11,007.00 PROD1 TAG UP.FLOW CHECK-NO FLOW. Printed 11/17/2014 9:59:13AM North America-ALASKA-BP Page 20 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date: 10/18/2014 End Date:11/3/2014 X3-015N1 (4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UW:500292220900 Active datum:ORIG KELLY BUSHING @69.00usft(above Mean Sea Level) Date From-To Hrs I Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:10 - 04:45 0.58 DRILL N DPRB 11,007.00 PROD1 POP OFF WELL.PLACE INJECTOR OVER BUNG HOLE+CIRC COIL.SHORT CHAIN BHA OOH.BHA IS PACKED WITH CLAYSTONE.BIT • HAD TWO PLUGGED NOSE PORTS 8 BALLED UP,1-1. MU 2-7/8"MM+NEW HCC 4-1/8"BIT.STAB ONTO WELL. 04:45 - 05:00 0.25 DRILL N DPRB 11,007.00 PROD1 PRESSURE TEST QTS.250PSI/3800PSI- PASS. 05:00 - 08:00 3.00 DRILL N DPRB 11,007.00 PROD1 RIH. CIRC 0.4BPM/656 PSI. 08:00 - 18:00 10.00 I DRILL N DPRB 11,007.00 PROD1 DRILL 4-1/8"BUILD SECTION F/9583'-10,000' MD BPM IN/OUT:2.73/2.71 CIRC PSI: 2963-3186 -MW IN/OUT:9.55 PPG/9.54 PPG -IA/OA/PVT:72/70/378 -DHWOB:1.0K LBS-5K LBS -ECD:10.60-10.73 •••PERFORM BHA WIPERS AS NEEDED FOR HOLE CLEANING. 18:00 - 20:00 2.00 DRILL N DPRB 11,007.00 PROD1 PERFORM WIPER F/10,000'-8000'MD -PUMP 25 BBLS LOW VIS SWEEP -POOH F/10,000'-9,000'MD -OPEN EDC.PUMP MAX RATE TO JET CASING 20:00 - 21:00 1.00 DRILL N DPRB 11,007.00 PROD1 CONTINUE TO POOH SLOWLY WHILE CIRC AT 3.70 BPM IN/OUT UNTIL SHAKERS CLEAR. SEE LARGE AMOUNT OF SHALE AND CLAY -- CUTTINGS ON SHAKER. 21:00 - 23:00 2.00 DRILL N SFAL PROD1 WHILE ATTEMPT TO RIH,LOSE BHI DEPTH ENCODER.MOVE COIL SLOWLY AND CIRC WHILE TROUBLESHOOT DEPTH ENCODER. FIND CORRODED CONNECTION AND REPLACE SAME.ISSUE RESOLVED. 23:00 - 00:00 1.00 DRILL N DPRB 11,007.00 PROD1 RIH WITH DRILLING ASSEMBLY -TIE-IN WITH+4'CORRECTION -30'/MIN WITH 1.54/1.67 BPM IN/OUT -HOLE CONDITION GOOD ON TRIP TO BOTTOM • 10/29/2014 00:00 - 03:30 3.50 DRILL N DPRB 11,007.00 PROD1 DRILL AHEAD F/10,000'T/10,234'MD -FS:2850 PSI MTR WRK:250 PSI WOB: 2.0-2.5K# -BPM IN/OUT:2.70/2.70 PVT:383 BBLS -MW IN/OUT:9.58/9.58 PPG ECD/IA/OA:10.75 PPG/82 PSI/55 PSI -FREQUENT BHA WIPERS REQUIRED TO KEEP HOLE CLEAN. -CONTINUE SEEING HIGH CUTTINGS LOAD ON SHAKER. 03:30 - 04:30 1.00 DRILL C PROD1 WIPER BACK TO WINDOW -PUMP 10 BBL LO-VIS/10 BBL HI-VIS SWEEP ON BOTTOM -25'/MIN WITH 2.75/2.53 BPM IN/OUT Printed 11/17/2014 9:59:13AM North America-ALASKA-BP Page 21 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date:11/3/2014 X3-015N1(4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING @69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:30 - 07:00 2.50 DRILL C PROD1 POOH WITH DRILLING ASSEMBLY -PULL INTO WINDOW,PULL HEAVY AT 9000' MD RIH WHILE PUMP AT HIGH RATE TO CLEAR CUTTINGS FROM BHA -FLOW CHECK INSIDE WINDOW,NO FLOW -OPEN EDC AND CONTINUE POOH -70'/MIN WITH 3.80/3.40 BPM IN/OUT -FLOW CHECK ON SURFACE,NO FLOW 07:00 - 09:00 2.00 DRILL C PROD1 CHANGE OUT BUILD BHA -STAND INJECTOR BACK -LD DIRECTIONAL TOOLS&INSPECT SAME -GRADE BIT 1-1 (RINGING ON NOSE) -CHANGE AKO SETTING TO 2.1 DEGREES MU 4-1/8"HUGHES BIT,MOTOR&MWD TOOLS -SET INJECTOR ONTO WELL -PRESSURE TEST QTS 250/3500(PASSED) 09:00 - 12:00 3.00 DRILL C PROD1 RIH W/4-1/8"BUILD BHA BPM IN/OUT:0.71/1.21 CIRC PSI:776 -MW IN/OUT:9.54 PPG/9.56 PPG IA/OA/PVT:77/37/322-378 -LOG TIE-IN WITH(-5')DEPTH CORRECTION 12:00 - 14:45 2.75 DRILL C PROD1 DRILL AHEAD F/10,234'-10,400'MD -BPM IN/OUT:2.71/2.70 PVT:383 BBLS -MW IN/OUT:9.58/9.58 PPG IA/OA/PVT:77 PSI/45/376 -WOB:2.0-4.5K# -ECD:10.69 14:45 - 15:10 0.42 DRILL C PROD1 PERFORM SHORT WIPER -PUMP 15 BBLS LOW VIS SWEEP -WIPER F/10,400'-10,200'MD -BPM IN/OUT:2.70/2.85 CIRC PSI:2882 -MW IN/OUT:9.64 PPG/9.61 PPG 15:10 - 19:00 3.83 DRILL C PROD1 DRILL AHEAD F/10,400'-10,486'MD -BPM IN/OUT:2.71/2.70 PVT:383 BBLS -MW IN/OUT:9.58 PPG/9.58 PPG -IA/OA/PVT:77 PSI/45/385 -WOB:2.0-4.5K# -ECD:10.69 "'PERFORM FREQUENT WIPERS WHILE DRILLING 19:00 - 20:30 1.50 DRILL C PROD1 CANNOT KEEP CONSISTENT WEIGHT TRANSFER WHILE DRILLING PERFORM LONG WIPER TO WINDOW -PUMP 15 BBL LO-VIS SWEEP OFF BOTTOM -30'/MIN WITH 2.90/2.71 BPM IN/OUT TO WINDOW -PULL INTO WINDOW UP TO 8900'MD,NO ISSUES -TIE-IN TO RA TAG WITH+3'CORRECTION -40'/MIN WITH 2.70/2.88 BPM IN/OUT -STACK WT AND SEE MTR WRK AT 9,560'MD, POP THROUGH. Printed 11/17/2014 9:59:13AM • North America-ALASKA-BP Page 22 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date:11/3/2014 X3-015N1 (4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING©69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 23:00 2.50 DRILL C PROD1 DRILL AHEAD F/10,486'T/10,562'MD -FS:3175 PSI MTR WRK:250 PSI WOB: 3.0-4.5K# -BPM IN/OUT:2.90/2.88 PVT:372 BBLS -MW IN/OUT:9.61/9.59 PPG -ECD/IA/OA:10.75 PPG/85 PSI/63 PSI -DIFFICULT WT TRANSFER AND SLIDING LAND BUILD AT 10,562'MD 23:00 - 00:00 1.00 DRILL C PROD1 POOH WITH BUILD ASSEMBLY -PUMP 10 BBL LO-VIS/10 BBL HI-VIS SWEEP OFF BOTTOM -30'/MIN WITH 2.90/2.71 BPM IN/OUT -PULL INTO WINDOW,PULL HEAVY AT 9000' MD,PACK OFF. -RIH AND STACK WEIGTH.WORK COIL TO REGAIN CIRCULATION. -MOVE COIL WHILE CIRC AT 2.7 BPM.RIH TO WINDOW.OPEN EDC. -CONTNUE POOH AT 10'/MIN WHILE CIRC BU AT 3.9 BPM. -SEE LARGE AMOUNT OF GRAVEL/CAVINGS ON SHAKER WITH BU. 10/30/2014 00:00 - 02:30 2.50 DRILL C PROD1 CONTINUE POOH WITH BUILD ASSEMBLY FLOW CHECK ABOVE WINDOW,NO FLOW -70'/MIN WITH 3.70/3.28 BPM IN/OUT -FLOW CHECK ON SURFACE,NO FLOW 02:30 - 03:00 0.50 DRILL C PROD1 PJSM AND LD BUILD ASSEMBLY -STAND BACK INJECTOR,CIRC OVER BUNGHOLE -LD 3"COILTRAK -LD MOTOR AND BIT -BIT GRADE:4-2-RO-N-X-I-CT-BHA 03:00 - 04:00 1.00 DRILL C PROD1 PJSM AND PU LATERAL ASSEMBLY -PU NEW HCC 4-1/8"BI-CENTER BIT AND XTREME MOTOR -PU 3"COILTRAK W/RESISTIVITY -PU INJECTOR AND GET ON WELL _-PRESS TEST QTS TO 250/3500 PSI 04:00 - 06:30 2.50 DRILL C PROD1 RIH WITH LATERAL ASSEMBLY -90'/MIN WITH 0.65/1.13 BPM IN/OUT -TIE-IN WITH-6'CORRECTION -30'/MIN WITH 1.90/2.05 BPM IN/OUT IN OPEN HOLE 06:30 - 11:00 4.50 DRILL C PROD1 PERMORM MADD PASS LOG F/10,562'-9050' MD -BPM IN/OUT:2.40/2.30 CIRC PSI:2366 -MW IN/OUT:9.56 PPG/9.55 PPG -IA/OA/PVT:81/48/395 -ECD:10.76 ***PUMP 15 BBLS LOW VIS SWEEP ***INCREASE BHA LATERAL VIBRATIONS WHILE PERFORMING MADD PASS(SEVERITY 2-3) ***CONTINUE SEEING CAVINGS ON SHAKERS Printed 11/17/2014 9:59:13AM • • North America-ALASKA-BP Page 23 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date:11/3/2014 X3-015N1 (4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING©69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 15:00 4.00 DRILL C PROD1 DRILL4-1/8"LATERAL SECTION F/10,562'- 10,711'MD -BPM IN/OUT:2.72/2.72 CIRC PSI:3182 MW IN/OUT:9.58 PPG/9.53 PPG IA/OA/PVT:81/55/388 -ECD:10.71 -WOB:1-3K "`DIFFICULTY SLIDING MAKE FREQUENT 100'-150'WIPER TRIPS 15:00 - 15:30 0.50 DRILL C PROD1 PERFORM WIPER TRIP F/10,711'-10,200'MD PREPARE PITS FOR MUD SWAP 15:30 - 21:00 5.50 DRILL C PROD1 DRILL 4-1/8"LATERAL SECTION F/10,711'- 11,006'MD -FS:3000 PSI MTR WRK:400-500 PSI WOB: 2.0-3.5K# -BPM IN/OUT:2.72/2.70 PVT:437 BBLS -MW IN/OUT:9.53/9.53 PPG -ECD/IA/OA:10.82 PPG/82 PSI/70 PSI "`PUMP 15 BBLS HIGH VIS SWEEP 'FOLLOWED BY NEW MUD DOWNHOLE FOR MUD SWAP. "'VERY POOR WEIGHT TRANSFER AFTER MUD SWAP COMPLETED. "'MAKE FREQUENT 100'WIPERS TO CLEAN HOLE. 21:00 - 00:00 3.00 DRILL P PROD1 PERFORM LONG WIPER BACK TO WINDOW -PUMP 10 BBL LO-VIS/15 BBL HI-VIS SWEEP ON BOTTOM -20'/MIN WITH 2.70/2.54 BPM TO WINDOW -PULL INTO WINDOW TO CONFIRM WINDOW CLEAR,NO ISSUES -TIE-IN WITH+6.5'CORRECTION -25'/MIN WITH 1.30/1.48 BPM IN/OUT TO BOTTOM STACK WTAND SEE 100 PSI MOTOR WORK AT 9560'MD 10/31/2014 00:00 - 03:00 3.00 DRILL P PROD1 CONTINUE WIPER FROM WINDOW TO BOTTOM 25'/MIN WITH 1.30/1.48 BPM IN/OUT 03:00 - 05:00 2.00 DRILL P PROD1 DRILL 4-1/8"LATERAL SECTION F/11,006'- 11,225'MD -FS:2900 PSI MTR WRK:100-200 PSI WOB: 1.5-3.OK# -BPM IN/OUT:2.60/2.59 PVT:432 BBLS -MW IN/OUT:9.57/9.53 PPG -ECD/IA/OA:10.82 PPG/82 PSI/70 PSI -MAKE FREQUENT 100'-200'WIPERS TO CLEAN HOLE. 05:00 - 06:00 1.00 DRILL N STUC 11,168.00 PROD1 PICK UP TO RE-SHOOT SURVEY AT 11,168'MD AFTER SHOOT SURVEY,CANNOT MOVE UP OR DOWN FREE CIRCULATION,NO INDICATION OF PACK-OFF WORK COIL IN ATTEMPT TO FREE W/O SUCCESS CIRCULATE BU,SHUT DOWN PUMPS AND RELAX HOLE Printed 11/17/2014 9:59:13AM North America-ALASKA-BP Page 24 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date:11/3/2014 X3-015N1 (4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING @69.00usft(above Mean Sea Level) _ Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 09:00 3.00 DRILL N STUC 11,168.00 PROD1 SHUTDOWN PUMPS TO RELAX WELLBORE -WAIT 20 MINS AND ATTEMPT TO PULL/ PUSH COIL -NO COIL MOVEMENT UP OR DOWN -PUMP 20 BBLS MINERAL OIL INTO COIL -DISPLACE 10 BBLS MINERAL OIL OUTSIDE OF COIL -WAIT 20 MINS AND ATTEMPT TO PULL/ PUSH COIL -NO COIL MOVEMENT UP OR DOWN(NOTIFY ODE) -DISPLACE 10 BBLS MINERAL OIL OUTSIDE OF COIL -WAIT 20 MINS AND ATTEMPT TO PULL/ PUSH -NO COIL MOVEMENT UP OR DOWN ***DISCUSS OPTIONS WITH ODE FOR SWAPPING WELL TO DEAD CRUDE ***WORK ON LOGISTICS WHILE OCN IS BEING PREPARED AND APPROVED 0900 - 09:30 0.50 DRILL -N STUC 11,188.00 PROD1 DISPLACE MINERAL OIL TO SURFACE -SHUT DOWN AND LET WELLBORE RELAX WAIT 20 MINS AND ATTEMPT TO PULL/ PUSH COIL -NO COIL MOVEMENT UP OR DOWN -DISPLACE MINERAL OIL TO CUTTINGS BOX 09:30 - 12:00 2.50 DRILL N STUC 11,168.00 PROD1 CALL FOR TRUCKING SUPPORT -ORDER 120 BBLS DEAD CRUDE -ORDER 290 KCL -ORDER(2)DIRTY TRUCKS(2)EMPTY TRUCKS 12:00 - 13:30 1.50 DRILL N •STUC 11,168.00 PROD1 PREPARE MUD PITS FOR DISPLACING FLUIDS -SPOT TRUCKS FOR FLUID TRANSFERS -CONTINUE PREPARING PITS 13:30 - 14:00 0.50 DRILL N STUC 11,168.00 PROD1 HELD PJSM FOR SWAPPING WELL TO DEAD CRUDE 14:00 - 15:30 1.50 DRILL N STUC 11,168.00 PROD1 SWAP WELL TO DEAD CRUDE PER OCN#7 -PUMP 50 BBLS KCL SPACER -PUMP 115 BBLS DEAD CRUDE-SET DN 16K •WHILE PUMPING CRUDE -PUMP 120 BBLS KCL -PUMP 120 BBLS 9.5 PPG MUD • -BPM IN/OUT:2.2/2.2 CIRC PSI:3252 -ANN PSI:5008-3781(500 PSI OVER BALANCE WHEN COIL POPPED FREE) -WHP:250 PSI "'FREE AT 15:25 HRS.WEIGHT PUSHING DOWN WHILE PUMPING 15-16K.COIL FREE ,125 BBLS BEFORE ESTIMATED 7.0 PPG CRUDE 1 RETURNS TO SURFACE. • Printed 11/17/2014 9:59:13AM North America-ALASKA-BP Page 25 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date:11/3/2014 X3-015N1 (4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING @69.Oousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:30 - 17:00 1.50 DRILL N STUC 11,168.00 PROD1 POP FREE WHILE PUMPING 150 BBLS DEAD CRUDE -RIH F/11,160'-11,220'MD -POOH TO WINDOW-PU WEIGHT:56K CONTINUE DISPLACING PER PLAN WHILE POOH -BPM IN/OUT:2.69/2.39 CIRC PSI:2461 MW IN/OUT:8.38 PPG/7.0 PPG -ANN PSI:3781 WHP:250 PSI ***CONTINUE PICKING UP WITH 44K-50K THRU VARIOUS SECTIONS OF THE OPEN HOLE. ***CIRCULATED 9.5 PPG DRILLING MUD F/ 10,000'-9060'MD IN OPEN HOLE 17:00 - 18:30 1.50 DRILL N STUC 11,168.00 PROD1 CIRCULATE 9.5 PPG MUD TO SURFACE -OPEN EDC AT WINDOW BPM IN/OUT:2.94/2.76 CIRC PSI:2500 -MW IN/OUT:9.52 PPG/9.52 PPG -IA/OA/PVT:73/48/346 -ANN PSI:4437 ECD:10.64 CONTINUE CIRCULATE 2X BU INSIDE WINDOW 18:30 - 20:00 1.50 DRILL ' N STUC 11,168.00 PROD1 WIPER TO BOTTOM -TIE-IN WITH+10.5'CORRECTION -RIH 30'/MIN WITH 1.6011.75 BPM IN/OUT -Wt BOBBLE AT 9550'MD BUT PASS THROUGH -TAG BOTTOM AT 11,225'MD 20:00 - 23:30 3.50 DRILL N STUC 11,168.00 PROD1 WIPER BACK TO WINDOW -PUMP 20 BBL LO-VIS SWEEP ON BOTTOM -POOH 25'/MIN WITH 2.75/2.61 BPM IN/OUT WIPER TO BOTTOM -TIE-IN WITH+2.5'CORRECTION -RIH 30'/MIN WITH 2.00/2.16 BPM IN/OUT -WT BOBBLE AT 9550'MD BUT PASS THROUGH -TAG BOTTOM AT 11,225'MD 23:30 - 00:00 0.50 DRILL P PROD1 DRILL 4-1/r LATERAL SECTION F/11,225'- 11,260'MD -FS:2700 PSI MTR WRK:100-200 PSI WOB: 1.5-3.0K# -BPM IN/OUT:2.55/2.54 PVT:327 BBLS -MW IN/OUT:9.53/9.45 PPG -ECD/IA/OA:10.54 PPG/73 PSI/42 PSI -MAKE FREQUENT 100'-200'WIPERS TO CLEAN HOLE. 11/1/2014 00:00 - 02:30 2.50 DRILL P PROD1 DRILL4-1/8"LATERAL SECTION F/11,260'- 11,374'MD -FS:2700 PSI MTR WRK:100-200 PSI WOB: 1.5-3.OK# -BPM IN/OUT:2.55/2.54 PVT:327 BBLS -MW IN/OUT:9.53/9.50 PPG -ECD/IA/OA:10.74 PPG/73PSI/45 PSI -MAKE FREQUENT 100'-200'WIPERS TO CLEAN HOLE. -HOLE STICKY.HEAVY PICK-UPS.DIFFICULT TO CHANGE DIRECTIONS. Printed 11/17/2014 9:59:13AM • • North America-ALASKA-BP Page 26 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date:11/3/2014 X3-015N1 (4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING©69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:30 03:00 0.50 DRILL N STUC 11,328.00 PROD1 WORK TO FREE STUCK COIL -AT 11,374'MD,LOSE MOTOR WORK AND PICK UP TO 11,328'MD. -ATTEMPT TO RIH AND CANNOT.ATTEMPT TO POOH AND CANNOT. -ABLE TO CIRCULATE W/O RESTRICTION. SHUTDOWN PUMPS TO RELAX WELLBORE WAIT 20 MINS AND ATTEMPT TO PULL/ PUSH COIL -NO COIL MOVEMENT UP OR DOWN(NOTIFY SUPERINTENDENT) 03:00 - 04:45 1.75 DRILL N STUC 11,328.00 PROD1 ATTEMPT TO FREE COIL WITH MINERAL OIL -PUMP 20 BBLS MINERAL OIL INTO COIL -DISPLACE 10 BBLS MINERAL OIL OUTSIDE OF COIL WAIT 20 MINS AND ATTEMPT TO PULL/ PUSH COIL -NO COIL MOVEMENT UP OR DOWN(NOTIFY ODE) -DISPLACE 20 BBLS MINERAL OIL OUTSIDE OF COIL -WAIT 20 MINS AND ATTEMPT TO PULL/ PUSH COIL -NO COIL MOVEMENT UP OR DOWN 04:45 - 06:00 1.25 DRILL , N STUC 11,328.00 PROD1 CIRCULATE MINERAL OIL OUT OF HOLE -PUMP 2520 PSI -2.66/2.62 BPM IN/OUT - EDC:10.19 PPG. -WITH MINERAL OIL AT SURFACE,SHUT DOWN PUMPS -WAIT 20 MINS AND ATTEMPT TO PULL/ PUSH COIL -NO COIL MOVEMENT UP OR DOWN -CIRC OUT MINERAL OIL TAKING RETURNS TO CUTTING BOX. 06:00 - 08:00 2.00 DRILL N STUC 11,328.00 PROD1 CIRCULATE WHILE WAIT ON KCL AND CRUDE -PUMP 1580 PSI -1.62/1.53 BPM IN/OUT - EDC:10.59 PPG. -HOLD-20K#UP TENSION -POSITION AND BACK IN TRUCKS ON ARRIVAL 08:00 - 10:00 2.00 DRILL N STUC 11,328.00 PROD1 PJSM AND PUMP KCL AND CRUDE AS PER OCN#7/8 SWAP WELL TO DEAD CRUDE PER OCN#7/8 -PUMP 50 BBLS KCL SPACER -PUMP 115 BBLS DEAD CRUDE-SET DN 16K WHILE PUMPING CRUDE -PUMP 45 BBLS KCL -PUMP 120 BBLS 9.5 PPG MUD -BPM IN/OUT:2.2/2.2 CIRC PSI:2406 -ANN PSI:4972-3881 (600 PSI OVER BALANCE WHEN COIL POPPED FREE) -WHP:250 PSI 10:00 - 12:00 2.00 DRILL N STUC 11,328.00 PROD1 POP FREE WHILE PUMPING 150 BBLS DEAD CRUDE -RIH F/11,328'-11,373'MD -POOH TO WINDOW-PU WEIGHT:46K -CONTINUE DISPLACING PER PLAN WHILE POOH -BPM IN/OUT:2.71/2.54 CIRC PSI:2761 -MW IN/OUT:9.51 PPG/7.2-9.5 PPG -ANN PSI:3881- WHP:250-0 PSI Printed 11/17/2014 9:59:13AM • • North America-ALASKA-BP Page 27 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date:11/3/2014 X3-015N1(4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING @69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 12:45 0.75 DRILL N STUC 11,328.00 PROD1 CIRCULATE 9.5 PPG MUD TO SURFACE -OPEN EDC AT WINDOW -BPM IN/OUT:2.94/2.76 CIRC PSI:2500 -MW IN/OUT:9.52 PPG/9.52 PPG IA/OA/PVT:73/48/346 -ANN PSI:4437 ECD:10.64 -CONTINUE CIRCULATE BOTTOMS UP INSIDE 'WINDOW ADDING 2 PPB OF G-SEAL LOG TIE-IN WITH(+8')CORRECTION 12:45 - 14:30 1.75 DRILL N STUC 11,328.00 PROD1 RIH TO BOTTOM F/9,060'-11,373'MD -BPM IN/OUT:1.52/1.63 CIRC PSI:1715 -MW IN/OUT:9.48 PPG/9.49 PPG -IA/OA/PVT:72/46/145 -ANN PSI:4755 ECD:10.47 14:30 - 15:50 1.33 DRILL P PROD1 DRILL 4-1/8"LATERAL SECTION F/11,374'- 11,492'MD -BPM IN/OUT:2.60/2.59 PVT:432 BBLS -MW IN/OUT:9.57/9.53 PPG -IA/OA/PVT:74/45 PSI/150-400 BBLS -ANN PSI:5052 ECD:10.93 -WOB:1-2.5K -MAKE FREQUENT 100'-200'WIPERS TO CLEAN HOLE. -ADD 2 SX/HR G-SEAL TO ACTIVE SYSTEM ***ADD 250 BBLS 9.5 PPG MUD WITH 2 PPB G-SEAL TO ACTIVE SYSTEM 15:50 - 16:30 0.67 DRILL P PROD1 WIPER TO CLEAN HOLE F/11,492'-9700'MD -NORMAL PU WEIGHT 42K -PU 70'FOR SHORT WIPER -30K OVER PULL AFTER GOING DOWN AND EXCEEDING 18K SLACK OFF WEIGHT -DECISION MADE TO WIPER TO 9,700'MD 16:30 - 19:00 2.50 DRILL P PROD1 POOH TO CHANGE AKO MOTOR SETTING& PU AGITATOR -BPM IN/OUT:2.55/2.39 -MW IN/OUT:9.55 PPG/9.48 PPG -IA/OA/PVT:74/45 PSI/415 BBLS -ANN PSI:4856 ECD:10.68 19:00 - 19:30 0.50 DRILL P PROD1 PJSM AND LD LATERAL ASSEMBLY -POP OFF,STAND BACK INJECTOR,BLOW DOWN -LD 3"COILTRAK W/RESISTIVITY -LD XTREME MOTOR AND BIT -BIT GRADE:2-1-RO-N-X-I-ER-BHA 19:30 - 20:00 0.50 BOPSUR P PROD1 PJSM AND FUNCTION TEST BOPS 20:00 - 23:00 3.00 DRILL P PROD1 PJSM AND PERFORM COIL&SLACK MANAGEMENT -SHUT SWAB AND INSTALL NIGHT CAP PER L2RA -CUT 80'OF E-LINE AND COIL -BOOT E-LINE,GET ON WELL,PUMP BACK SLACK CUT 20'OF COIL -INSTALL CTC,PULL TEST TO 35K#,PT TO 250/3500 PSI -CHANGE INJECTOR PACKOFFS -MU NOZZLE AND GET ON WELL,PUMP SLACK FORWARD -PT PACKOFFS TO 250/3500 PSI Printed 11/17/2014 9:59:13AM • North America-ALASKA-BP Page 28 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date:11/3/2014 X3-015N1 (4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING @69.00usft(above Mean Sea Level) Date From-To Hrs Task Code i NPT NPT Depth Phase Description of Operations (hr) (usft) 23:00 - 00:00 1.00 DRILL P PROD1 PJSM AND HEAD UP BHI -POP OFF,BREAK OFF NOZZLE -TEST E-LINE RESISTANCE AND CONTINUITY,GOOD -INSTALL UQC W/O CHECK RE-TEST E-LINE RESISTANCE AND CONTINUITY,GOOD -PT UQC TO 250/3500 PSI 11/2/2014 00.00 - 00:30 0.50 DRILL P PROD1 CONTINUE HEAD UP BHI PT UQC TO 250/3500 PSI 00:30 - 01:00 1.50 DRILL P PROD1 1PJSM AND PU LATERALASSEMBLY -PU ULS MOTOR AND HUGHES 3.75"X 4.25" BI-CENTER BIT -PU 2-7/8"P3 ERT AGITATOR -PU 3"COILTRAK WITH RESISTIVITY -GET ON WELL,PRESS TEST QTS TO 250/3500 PSI -RIH TO 200'AND SURFACE TEST AGITATOR, GOOD -CIRCULATE COIL VOLUME AT 3.0 BPM THRU OPEN EDC 01 00 - 04 45 3.75 DRILL P PROD1 RIH WITH LATERAL ASSEMBLY -100'/MIN WITH 1.78/2.30 BPM IN/OUT 'CASED HOLE -TIE-IN WITH-6'CORRECTION -30'/MIN WITH 0.83/0.95 BPM IN/OUT OPEN HOLE -NO ISSUES ON TRIP TO BOTTOM 04:45 - 09:00 4.25 DRILL I P PROD1 DRILL 4-1/4"LATERAL SECTION F/11,492'- 11,650'MD -FS:2950 PSI MTR WRK:100-250 PSI WOB: 1.5-3.0K# -BPM IN/OUT:2.52/2.49 PVT:398 BBLS -MW IN/OUT:9.55/9.50 PPG ECD/IA/OA:10.84 PPG/68 PSI/21 PSI -MAKE FREQUENT 100'-200'WIPERS TO CLEAN HOLE. -DIFFICULT TRANSFERING WEIGHT TO BIT. -ADD 2 SX/HR G-SEAL TO ACTIVE SYSTEM 09:00 - 10:30 1.50 DRILL P PROD1 PERFORM WIPER F/11,650'-10,200'MD -PUMPED 10 BBLS LOW VIS SWEEP 10:30 - 11:00 0.50 DRILL P PROD1 DRILL 4-1/8"LATERAL SECTION Fl 11,650'- 11,665'MD -BPM IN/OUT:2.60/2.59 -MW IN/OUT:9.57/9.53 PPG IA/OA/PVT:74/45 PSI/385 BBLS '-ANN PSI:4959 ECD:10.80 -WOB:2-3.5K I-ADD 2 SX/HR G-SEAL TO ACTIVE SYSTEM "`UNABLE TO GET GOOD WEIGHT TRANSFER TO THE BIT.DECISION MADE TO POOH TO CHANGE WEATHERFORD P3 AGITATOR AND BHI LOW SPEED MOTOR. Printed 11/17/2014 9•59•13AM • • • North America-ALASKA-BP Page 29 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date:11/3/2014 X3-015N1 (4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING @69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 15:00 4.00 DRILL P PROD1 POOH TO CHANGE AKO MOTOR SETTING& PU NOV AGITATOR -BPM IN/OUT:2.55-3.05/2.39-2.49 -MW IN/OUT:9.55 PPG/9.50 PPG -IA/OA/PVT:74/45 PSI/385 BBLS -ANN PSI:4856 ECD:10.8 ***SURFACE TEST WEATHERFORD P3 AGITATOR AT 200'MD @ 2.5 BPM.VERY WEAK INDICATION OF AGITATOR PULSING AT THE INJECTOR,NO PULSE INDICATION AT REEL HOUSE HORSE HEAD. ***WEATHERFORD P3 AGITATOR DOES NOT GIVE ENOUGH MOVEMENT TO HELP IN A DRILLING APPLICATION. 15:00 - 15:30 0.50 DRILL P PROD1 LD DIRECTIONAL TOOLS FLOW CHECK(NO FLOW) STAND INJECTOR BACK -LD DIRECTIONAL TOOLS&INSPECT SAME -BIT GRADE(1-1)BALLING ON GAUGE ROW 15:30 - 16:00 0.50 DRILL P PROD1 MU 4-1/4"LATERAL BHA MU BHI HIGH SPEED MOTOR,NOV AGITATOR,MWD TOOLS GET ONTO WELL WITH INJECTOR -PRESSURE TEST QTS 250/3500(PASSED) ***SURFACE TEST NOV AGITATOR AT 200'MD @ 1.8 BPM.VERY STRONG INDICATION OF AGITATOR PULSING AT THE INJECTOR.VERY GOOD PULSE INDICATION AT REEL HOUSE HORSE HEAD. 16:00 - 17:30 1.50 DRILL P PROD1 RIH TO WINDOW -BPM IN/OUT:1.06/1.53 CIRC PSI:1036 -MW IN/OUT:9.53 PPG/9.53 PPG -IA/OA/PVT:72/46/325 -ECD:10.77 -LOG TIE IN WITH(-7.5)DEPTH CORRECTION 17:30 - 19:30 2.00 DRILL P PROD1 WIPER TO BOTTOM -25'/MIN WITH 0.90/1.00 BPM IN/OUT -TRIP TO BOTTOM SMOOTH 19:30 - 21:30 2.00 DRILL P PROD1 DRILL 4-1/4"LATERAL SECTION F/11,665'- 11,787'MD -FS:3500 PSI MTR WRK:100-300 PSI WOB: 1.0-2.5K# -BPM IN/OUT:2.50/2.48 PVT:364 BBLS -MW IN/OUT:9.64/9.57 PPG -ECD/IA/OA:10.94 PPG/73PSI/45PSI -DIFFICULT SLIDING.FREQUENTLY LOSE MOTOR WORK AND PICK UP. -HOLE STICKY.HEAVY PICK-UPS.DIFFICULT TO CHANGE DIRECTIONS. ADD 2 SX/HR G-SEAL TO ACTIVE SYSTEM Printed 11/17/2014 9:59:13AM • North America-ALASKA-BP Page 30 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date:11/3/2014 X3-015N1(4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:OOAM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING @69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:30 - 22:00 0.50 DRILL N STUC 11,787.00 PROD1 WORK TO FREE STUCK COIL -AT 11,787'MD,LOSE MOTOR WORK AND ATTEMPT PICK UP. -CANNOT PICK UP.DIFFERENTIALLY STUCK ON BOTTOM. -ABLE TO CIRCULATE W/O RESTRICTION. SHUTDOWN PUMPS TO RELAX WELLBORE WAIT 20 MINS AND ATTEMPT TO PULL/ PUSH COIL. -NO COIL MOVEMENT UP OR DOWN(NOTIFY SUPERINTENDENT&ODE). 22:00 - 23:00 1.00 DRILL N STUC 11,787.00 PROD1 ATTEMPT TO FREE COIL WITH MINERAL OIL • -PUMP 20 BBLS MINERAL OIL INTO COIL. -DISPLACE 10 BBLS MINERAL OIL OUTSIDE OF COIL. -WAIT 20 MINS AND ATTEMPT TO PULL/ PUSH COIL. COIL COME FREE. 23:00 - 00:00 1.00 DRILL N STUC 11,787.00 PROD1 PERFORM WIPER TO 11,100'MD WHILE CIRCULATE OUT MINERAL OIL -POOH AT 22'/MIN WITH 2.00/1.86 BPM • IN/OUT -RIH AT 26'/MIN AND 2.58/2.70 BPM IN/OUT • 11/3/2014 00:00 - 02:00 2.00 DRILL P PROD1 DRILL4-1/8"LATERAL SECTION F/11,787'- 11,869'MD FS:3400 PSI MTR WRK:200-400 PSI WOB: 2.0-2.5K# -BPM IN/OUT:2.48/2.44 PVT:321 BBLS -MW IN/OUT:9.65/9.56 PPG -ECD/IA/OA:10.88 PPG/79PSI/40PSI -DIFFICULT SLIDING,FREQUENTLY LOSE MOTOR WORK AND PICK UP. -HOLE STICKY.HEAVY PICK-UPS.DIFFICULT TO CHANGE DIRECTIONS. -ADD 3 SX/HR G-SEAL TO ACTIVE SYSTEM 02:00 - 02:30 0.50 DRILL N STUC 11,870.00 PROD1 WORK TO FREE STUCK COIL -AT 11,869'MD,LOSE MOTOR WORK AND ATTEMPT PICK UP. -CANNOT PICK UP.DIFFERENTIALLY STUCK ON BOTTOM. -ABLE TO CIRCULATE W/O RESTRICTION. SHUTDOWN PUMPS TO RELAX WELLBORE -WAIT 20 MINS AND ATTEMPT TO PULL/ PUSH COIL. -NO COIL MOVEMENT UP OR DOWN. 02:30 - 04:00 1.50 DRILL N STUC 11,870.00 PROD1 ATTEMPT TO FREE COIL WITH MINERAL OIL -PUMP 20 BBLS MINERAL OIL INTO COIL -DISPLACE 10 BBLS MINERAL OIL OUTSIDE OF COIL -WAIT 20 MINS AND ATTEMPT TO PULL/ PUSH COIL -DISPLACE 20 BBLS MINERAL OIL OUTSIDE OF COIL -WAIT 20 MINS AND ATTEMPT TO PULL/ PUSH COIL COIL COME FREE. Printed 11/17/2014 9:59:13AM • North America-ALASKA-BP Page 31 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date:11/3/2014 X3-015N1(4,197,222.00) • Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING©69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:00 - 06:15 2.25 DRILL N STUC 11,870.00 PROD1 WIPER TO WINDOW TO TIE-IN AND CIRC OUT MINERAL OIL -POOH AT 25'/MIN WITH 2.51/2.35 BPM IN/OUT -HIGH PUMP PRESS ON TRIP OUT.4000 PSI AT 2.5 BPM. -CHECK HIGH PRESSURE SCREENS.NO ISSUE. -CHECK OTHER SURFACE EQUIPMENT,NO ISSUES FOUND. -PULL INTO WINDOW,OPEN EDC. -CIRC AT 3.5 BPM IN/OUT WITH 3300 PSI. -CLOSE EDC AND RUN INTO OPEN HOLE. -CIRC AT 3750 PSI AT 2.5 BPM. 06:15 - 08:30 2.25 DRILL N DFAL 11,870.00 PROD1 'POOH TO INSPECT BHA -PULL INTO WINDOW,CLOSE EDC,FLOW CHECK -POOH AT 100'/MIN WITH 3.0/2.85 BPM IN/OUT -SURFACE TEST NOV AGITATOR(GOOD TEST) 08:30 - 09:30 1.00 DRILL N DFAL 11,870.00 PROD1 LD DIRECTIONAL BHA -FLOW CHECK(NO FLOW) -STAND INJECTOR BACK -LD DIRECTIONAL TOOLS AND INSPECT •SAME -BIT GRADE(1-1)PLUGGED NOZZLE "'MOTOR RUBBER FOUND IN BIT NOZZLE. "'GEO DECIDE TO CALL TD AT CURRENT DEPTH. 09:30 - 11:00 1.50 CLEAN N DFAL 11,870.00 PROD1 MU 4-1/8"CLEANOUT BHA -CHANGE AKO MOTOR SETTINGS -SET-UP MWD TOOL FOR CLEANOUT RUN -MU DIRECTIONAL TOOLS -GET ONTO WELL WITH INJECTOR -PRESSURE TEST QTS 250/3500(PASSED) 11:00 - 15:30 4.50 CLEAN N DFAL 11,870.00 PROD1 RIH WITH CLEANOUT BHA -BPM IN/OUT:0.87-2.0/1.39-1.74 CIRC PSI: 1040-2375 -MW IN/OUT:9.51 PPG/9.51 PPG -IA/OA/PVT:67/23/200 -NO ISSUES WHILE RIH TO BOTTOM -TOTAL MEASURED DEPTH 11,875'MD. 15:30 - 17:00 1.50 CLEAN P PROD1 WIPER TO WINDOW F/11,874'-9020'MD -BPM IN/OUT:1.95/1.87 CIRC PSI:2505 -MW IN/OUT:9.55 PPG/9.50 PPG -IA/OA/PVT:72/28/245 17:00 - 19:00 2.00 CLEAN P PROD1 WIPER T BOTTOM -BPM IN/OUT:2.0/2.11 CIRC PSI:2736 -MW IN/OUT:9.51 PPG/9.51 PPG .-1A/0A/PVT:67/23/200 19:00 - 23:00 4.00 CLEAN P PROD1 POOH WITH CLEANOUT ASSEMBLY -LAY IN LINER RUNNING PILL W/2 PPB ALPINE BEADS -40'/MIN WITH 0.70/0.48 BPM IN/OUT -PULL INTO WINDOW,OPEN EDC,FLOW CHECK -80'/MIN WITH 2.30/1.85 BPM IN/OUT -FLOW CHECK AT SURFACE Printed 11/17/2014 9:59:13AM • North America-ALASKA-BP Page 32 of 32 Operation Summary Report Common Well Name:02-32 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/18/2014 End Date:11/3/2014 X3-015N1 (4,197,222.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UW:500292220900 Active datum:ORIG KELLY BUSHING @69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:00 - 23:30 0.50 CLEAN P PROD1 PJSM AND CLEANOUTASSEMLBY -POP OFF,STAND BACK INJECTOR -LD 3"COILTRAK -LD BIT AND MOTOR -BIT GRADE:1-1-NO-A-X-I-NO-TD 23:30 00:00 0.50 CLEAN P PROD1 CLEAN AND CLEAR RIG FLOOR -CLEAR RIG FLOOR PRIOR TO RU TO RUN LINER -CLOSE SWAB VALVE,INSTALL NIGHT CAP -CIRC IN BUNGHOLE CLOSE OUT RON EVENT AND BEGIN CON EVENT AT 00:00 ON 11/04/2014. Printed 11/17/2014 9:59:13AM • North America-ALASKA-BP Page 1 of 7 Operation Summary Report Common Well Name:02-32 AFE No Event Type:COM-ONSHORE(CON) Start Date:11/4/2014 End Date:11/7/2014 X3-015N1(1,358,797.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING(g69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase ' Description of Operations (hr) (usft) 11/4/2014 00:00 - 02:30 2.50 CASING P RUNPRD RIG UP TO RUN 2-7/8"X 3-1/4"LINER -PJSM AND PUMP OUT SLACK.CALCULATED SLACK AT 291'.RECOVER 148'. -CUT OFF SLB CTC.DRESS COIL END.BOOT E-LINE.INSTALL BTT EXTERNAL SLIP CTC. -PULL TEST CTC TO 35K#.PRESS TEST TO 250/3500 PSI. -LAUNCH 3/4"DRIFT BALL.BALL RECOVERED. -SET INJECTOR ON LEGS.CIRC OVER BUNGHOLE. -DRESS ELEVATORS,POWER TONGS. -LAY OUT SLIPS,LINER DRIFT,X-OVERS, AND FLOOR VALVE. -NORDIC DRILLER,TOOLPUSHER,WSL,BTT REP REVIEW PIPE COUNT IN THE SHED. !REVIEW AND AGREE ON TALLY. 02-30 - 09:00 6.50 CASING P RUNPRD PJSM AND RUN 2-7/8"X 3-1/4"LINER -RUN GUIDE SHOE AND 2-7/8"SHOE TRACK IJOINT WITH FLOAT EQUIPMENT. -RUN 41 JTS 2-7/8"6.4#STL L-80 LINER -PU RA MARKER PUP -RUN 52 JTS 3-1/4",6.6#,3-3/16"TCII,L-80 LINER -RUN 1 JT 3-1/2",9.3#,STL,L-80 LINER -RUN DEPLOYMENT SLEEVE AND X NIPPLE -PU LINER RUNNING TOOLS WITH 6 JTS PH6 09:00 - 11:00 2.00 CASING P RUNPRD RIH WITH 2-7/8"x 3-1/4"LINER TO WINDOW -BPM IN/OUT:0.35/0.73 CIRC PSI:1326 -MW IN/OUT:9.5 PPG/9.5 PPG -IA/OA/PVT:72/10/220 -SEE WINDOW FLAG AT 8750'MD(-12' CORRECTION) _ 11:00 - 12:30 1.50 CASING P RUNPRD RIH FROM WINDOW WITH LINER -30'/MIN WITH 0.33/0.46 BPM IN/OUT -SEE TD FLAG AT 11,850'MD(-12' CORRECTION) TAG TD AT 11,880'MD UNCORRECTED PU TO BREAKOVER AT 55K#AT 11,870'MD (UNCORRECTED -RIH AND STACK DOWN 10K#TO 11882'MD UNCORRECTED -PU TO BREAKOVER AT 54K#AT 11,870'MD UNCORRECTED -RIH AND STACK DOWN 10K#TO 11882'MD UNCORRECTED Printed 11/17/2014 9:59:53AM • • North America-ALASKA-BP Page 2 of 7 Operation Summary Report Common Well Name:02-32 AFE No Event Type:COM-ONSHORE(CON) Start Date:11/4/2014 End Date:11/7/2014 X3-015N1 (1,358,797.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING©69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:30 - 18:15 5.75 CASING N SFAL 11,875.00 RUNPRD PJSM AND RELEASE FROM LINER LOAD 10 BBLS KCL INTO COIL.LAUNCH 5/8" BALL. -CIRC BALL TO SEAT.ROCK PUMPS, PRESSURE UP AND DUMP PRESSURE. CANNOT GET BALL ON SEAT. -TOTAL VOLUME PUMPED 69 BBLS. PUMP 10 BBLS KCL SWEEP.PRESSURE UP AND DUMP.CIRC SWEEP TO CTC.ROCK PUMPS.PRESSURE UP AND DUMP.CANNOT GET BALL ON SEAT. -TOTAL VOLUME PUMPED 172 BBLS. -LOAD 10 BBLS KCL INTO COIL.LAUNCH 2ND 5/8"BALL. -NO INDICATION THAT BALL IS MOVING. -PUMP 65 BBL. -SHUT DOWN PUMPS. -PU TO DETERMINE IF LINER IS FREE. BREAK OVER WT 55 KLBS. LINER DID NOT RELEASE. BEGIN MIXING 20 BBL HIGH VIS SWEEP. -PU 75'AND RUN BACK DOWN TO ATTEMPT 'TO RICK BALL LOSE. REMOVE BALL DROP CAP AND OPEN VALVE TO INSPECT BALL DROP IRON. -RUN HOSE IN BALL DROP IRON AND CLEAR OBSTRUCTION IN IRON. CLOSE VALVE AND REINSTALL CAP. 18:15 - 19:00 0.75 CASING P RUNPRD -RELAUNCH BALLS. -BALLS CAN BE HEARD MOVING THROUGH COIL NOW. -LAND BALL AFTER 47 BBL PUMPED. -PRESSURE UP TO RELEASE LINER AND SHEAR BALL SEAT. -SEAT SHEARED AT 4251 PSI. -PU TO BREAKOVER WEIGHT TO CONFIRM LINER RELEASED AT 40 KLBS. -GOOD CONFIRMATION THAT LINER RELEASED. 19:00 - 22:30 3.50 CEMT P RUNPRD PJSM AND DISPLACE WELL F/9.5 PPG POWER-PRO TO 8.4 PPG KCL. -1.75/1.70 BPM IN/OUT. -WITH WELL SWAPPED TO 1%KCL,CIRC PRESS=1102 PSI AT 1.57/1.51 BPM IN/OUT. SPOT AND RIG UP SLB CEMENTERS. 22:30 - 00:00 1.50 CEMT P RUNPRD RU AND PREP FOR CEMENT JOB -HOLD PJSM FOR PUMP CEMENT WITH ALL PERONNEL. -SEND 5 BBLS KCL TO CEMENTERS. -PRESS TEST CEMENTERS TO 250/6000 PSI FOR 5/5 MIN. -WSL PERFORM PRESSURE CROSSCHECK CHECKLIST WITH CEMENT LEAD. -WSL VERIFY PUMP TRUCK TRIPS FUNCTION PROPERLY. -BATCH UP CEMENT TO 15.8 PPG. Printed 11/17/2014 9:59:53AM • • North America-ALASKA-BP Page 3 of 7 Operation Summary Report Common Well Name:02-32 AFE No Event Type:COM-ONSHORE(CON) Start Date:11/4/2014 End Date:11/7/2014 X3-015N1 (1,358,797.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING @69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11/5/2014 00:00 - 01:30 1.50 CEMT P RUNPRD CEMENT 2-7/8"X 3-1/4"LINER WITH 27.6 BBLS 15.8 PPG CLASS G CEMENT ALL DEPTHS ARE UNCORRECTED 23:57-CMT TO WEIGHT,15.8 PPG.LOSS RATE=3 BBL/HR 00:00-SWAP COIL PUMP TO EXHAUST PILL. PUMP 5 BBLS EXHAUST PILL TO REEL. 00:01-SHUT DOWN RIG PUMP AND LINE UP CMT PUMP DOWN THE COIL. 00:03-ON LINE WITH CMT PUMP WITH 5 BBLS OF KCL FOLLOWED BY CEMENT. 00:04-ZERO IN MM AT 14.0 PPG DENSITY. 00:19-SHUT DOWN PUMP 27.7 BBLS AWAY. SEND 5 BBLS EXHAUST PILL TO CEMENTERS. 00:23-ONLINE WITH RIG PUMP TO DISPLACE CMT WITH EXHAUST PILL.TRIPS SET TO 4200 PSI. 00:46-AT 76.9 BBLS AWAY,ZERO OUT MM. I TAKE RETURNS TO PITS 2&3.MANUAL STRAP=103 BBLS. 00:48-AT 82.5 BBLS AWAY STOP PUMPS. PU TO BREAKOVER 44K#AT 11,874'MD.PICK UP '13'TO 11,861'MD.RIH AND STACK DOWN 10K AT 11,872'MD. 1 00:52-SET TRIPS TO 1800 PSI.BRING UP PUMPS TO 1.0 BPM AND LAUNCH PEE WEE DART. 00:54-PU TO PRESSURE DROP ON COIL AND SIDE EXHAUST 2 BBLS OF CMT AND 3 BBLS OF EXHAUST PILL. 00:59-AT 5 BBLS PUMPED,OPEN BAKER CHOKE AND STACK WT BACK DOWN.ZERO IN MM.CLOSE BAKER CHOKE.RESET PUMP TRIPS TO 4400 PSI. 01:02-LWP SHEARED AT 4000 PSI.DISPLACE LWP AT 3500 PSI CIRC PRESSURE,1.5-2.5 BPM. 01:11-PUMP TO THEORETICAL BUMP AT 19.9 BBLS PLUS 0.5 BBLS TO 20.4 BBLS.DID NOT BUMP PLUG. 01:13-BLEED OFF COIL PRESSURE TO CHECK FLOATS.OUT MM AT 30.7 BBLS. MANUAL STRAP=135 BBLS. 01:16-GOOD NO FLOW ON THE FLOATS. CLOSE THE BAKER CHOKE AND PRESSURE UP TO 1000 PSI. 01:17-PU TO PRESSURE DROP AND PUMP 5 BBLS OF EXHAUST PILL AT 0.5 BPM. 25.7 BBLS OF CMT BEHIND PIPE BASED ON OUT MM. 27 BBLS OF CMT BEHIND PIPE BASED ON PIT STRAP. 2.8 BBLS TOTAL LOSSES DURING CEMENT JOB. 01:30 - 04:00 2.50 CEMT P RUNPRD POOH WITH LINER RUNNING TOOLS -80'/MIN WITH 1.20/0.76 BPM IN/OUT -TAKE CEMENT CONTAMINATED MUD OUTSIDE -FLOW CHECK AT SURFACE,NO FLOW Printed 11/17/2014 9:59:53AM • North America-ALASKA-BP Page 4 of 7 Operation Summary Report Common Well Name:02-32 AFE No Event Type:COM-ONSHORE(CON) Start Date:11/4/2014 End Date:11/7/2014 X3-015N1(1,358,797.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING Q69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) _ 04:00 - 05:00 1.00 CEMT P -RUNPRD PJSM AND LD LINER RUNNING TOOLS -POP OFF,STAND BACK INJECTOR,CIRC OVER BUNGHOLE • -RECOVER 6'OF E-LINE -LD 6 JTS PH6 AND LINER RUNNING TOOLS -ONLY RECOVER 1 5/8"BALL LINER RUNNING TOOLS FUNCTIONED PER DESIGN 05:00 - 06:00 1.00 CEMT N SFAL RUNPRD PJSM AND LAUNCH 3/4"DRIFT BALL TO ENSURE 5/8"BALL NOT STILL IN REEL -PU STINGER AND NOZZLE,GET ON WELL, SHUT IN SWAB -PRESSURE UP AND LAUNCH BALL,CIRC COIL VOLUME -RECOVER 3/4"BALL -DID NOT RECOVER 5/8"BALL CONTINUE LOOKING ON SURFACE FOR 5/8" -EMPTY POSSUM BELLY AND CHECK FLOWLINE. I-EMPTY BUNG HOLE.EMPTY MOUSE HOLE. 06:00 - 08:00 2.00 CEMT N SFAL RUNPRD PJSM AND LAUNCH 7/8"DRIFT BALL TO ENSURE 5/8"BALL NOT STILL IN REEL PU STINGER AND NOZZLE,GET ON WELL, SHUT IN SWAB -PRESSURE UP AND LAUNCH BALL,CIRC • COIL VOLUME -RECOVER 7/8"AND 5/8"BALLS 08:00 - 12:00 4.00 EVAL P OTHCMP CLOSE MASTER AND SWAB VALVES. LEAK TIGHT TEST TREE VALVES. OPEN RAM DOORS AND CHANGE OUT 2-3/8" X 3-1/2"VBR'S FOR 1-1/4"COMB!RAMS. -INSTALL BTT DIMPLE CTC,PULL AND PRESSURE TEST SAME. 12:00 - 14:00 2.00 EVAL P OTHCMP PRESSURE TEST CSH RAMS AND ANNULAR WITH 1-1/4"JOINT TO 250/3500 PSI FOR 5 CHARTED MIN. RU FLOOR TO RUN 1-1/4"CSH AND LOGGING BHA. VERIFY LOGGING BHA COMPONENTS AND • l LAYOUT 14:00 - 17:15 3.25 EVAL P OTHCMP MU CLEANOUT/LOGGING BHA INCLUDING 2.3"MILL,MOTOR,2 X JTS 1-1/4"CSH, LOGGING CARRIER W/RPM TOOLS,AND 42 X JTS 1-1/4"CSH TO 1570'MD.TOOL SET TO ,TURN ON AT 18:45 AND TURN OFF AT 01:45. • STAB COIL.GET ON WELL. TEST QTS 250/3500 PSI. 17:15 - 19:00 1.75 EVAL P OTHCMP RIH WITH LOGGING BHA F/1570'TO 8800' PUMPING 0.3 BPM. CONFIRM DEPTH WITH RPM LOGGER AT ,3000'AND 4000'. TAKE CEMENT CONTAMINATED RETURNS OUT TO CUTTINGS BOX. Printed 11/17/2014 9:59:53AM • North America-ALASKA-BP Page 5 of 7 Operation Summary Report Common Well Name:02-32 AFE No Event Type:COM-ONSHORE(CON) Start Date:11/4/2014 End Date:11/7/2014 X3-015N1 (1,358,797.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud DateMme:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING©69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 22:00 3.00 EVAL P OTHCMP LOG DOWN FROM 8800'MD TO PBTD AS PER PLAN -LOG DOWN AT 30'/MIN WITH 1.54/1.70 BPM IN/OUT. -MILL CEMENT STRINGERS 9145'-9160'MD AND 10,678-10,750'MD WITH-100-200 PSI MOTOR WORK -TAKE CEMENT CONTAMINATED RETURNS OUT TO CUTTINGS BOX. -TAG PBTD AT 11,845'MD UNCORRECTED. -SET DOWN 5K WITH 300 PSI MOTOR WORK AND CONFIRM PBTD. 22:00 - 00:00 2.00 EVAL P OTHCMP LOG UP FROM 11,845'MD TO 8800'MD AS PER PLAN -LOG UP AT 20'/MIN WITH 0.47/0.38 BPM IN/OUT. -LAY IN 9.5 PPG PERF PILL FROM PBTD -PAINT TD FLAG AT 10,200'EOP 11/6/2014 00:00 - 00:30 0.50 EVAL P OTHCMP CONTINUE LOG UPAS PER PLAN -LOG UP AT 20'/MIN WITH 0.47 10.38 BPM IN/OUT. -LAY IN 9.5 PPG PERF PILL FROM PBTD -PAINT TOL FLAG AT 7,300'EOP 00:30 - 02:00 1.50 EVAL P i OTHCMP POOH WITH CLEANOUT/LOGGING BHA -FLOW CHECK ABOVE LINER TOP,NO FLOW -POH 90'/MIN WITH 1.00/0.50 BPM IN/POUT -FLOW CHECK AT SURFACE,NO FLOW 02:00 - 06:00 4.00 EVAL P OTHCMP PJSM AND LD CLEANOUT/LOGGIN BHA -POP OFF,STAND INJECTOR ON LEGS LD 4 JTS 2-1/16"CSH,BPV,&DISCONNECT -LD 42 JTS 1-1/4"CSH,DISCONNECT,&CIRC SUB -LD LOGGING CARRIER -LD 2 JTS 1-1/4"CSH,MOTOR,&MILL -OFFLOAD LOGGING TOOLS -DOWNLOAD MEMORY DATA AND INTERPRET 06:00 - 07:30 1.50 PERFOB P OTHCMP PJSM LOAD 57 PERF GUNS IN PIPE SHED. OFFLOAD LOGGING TOOLS. 07:30 08:45 1.25 PERFOB P OTHCMP PERFORM LINER LAP TEST PER PLAN -FILL STACK ,-INSTALL AND PT RISER CAP 250/3500 PSI -PRESSURE TEST 250/5 MINS -ON HIGH TEST,BEGAN INJECTING INTO FORMATION AT 1.0 BPM W/1500 PSI -TEST CHARTED(FAILED) 08:45 - 13:15 4.50 PERFOB P OTHCMP .PJSM AND PU PERFORATING BHA -MU 57 PERF GUNS PER SLB TCP '-MU 1-1/4"CSH WORKSTRING -MU RUNNING TOOLS AND GET ON WELL -PT QTS TO 250/3500 PSI FOR 5/5 MIN 13:15 - 16:15 3.00 PERFOB P OTHCMP RIH WITH PERF BHA -90'/MIN WITH 0.30/0.79 BPM IN/OUT -RUN INTO LINER AT 50'/MIN -CORRECT-8'TO PBTD FLAG -TAG BOTTOM AT 111835.66'MD -CORRECT TO 11840.49'MD -TAKE PU WT ON BOTTOM:48K# Printed 11/17/2014 9 59:53AM • • North America-ALASKA-BP Page 6 of 7 Operation Summary Report Common Well Name:02-32 AFE No Event Type:COM-ONSHORE(CON) Start Date:11/4/2014 End Date:11/7/2014 X3-015N1(1,358,797.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING @69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:15 - 16:45 0.50 PERFOB P OTHCMP PERFORATE WELL -PU TO PERF DEPTH:11,745.7'MD -PEFORM E-FIRE SEQUENCE -PERFORATE ON DEPTH MOVING UP SLOWLY -GOOD INDICATION GUNS FIRED ON DEPTH AT 11,740.7'MD. 16:45 - 20:00 3.25 PERFOB P OTHCMP POOH WITH PERF ASSEMBLY -40'/MIN INSIDE LINER HOLD 300 PSI WHP -FLOW CHECK ABOVE LINER,NO FLOW -90'/MIN TO SURFACE WITH 1.50/1.00 BPM IN/OUT j-FLOW CHECK AT SURFACE,NO FLOW 20:00 - 00:00 4.00 PERFOB P OTHCMP PJSM AND LD PERF ASSEMBLY POP OFF,STAND INJECTOR ON LEGS -LD 4 JTS 2-1/16"CSI-I,4 JTS 1-1/4"CSH,AND HANDLING TOOLS -LD E-FIRE HEAD AND 57 GUNS -ALL SHOTS FIRED 11/7/2014 00:00 - 01:00 1.00 WHSUR P POST RIG UP TO BULLHEAD FREEZE PROTECT -INSTALL NIGHT CAP AND PRESS TEST TO 250/3500 PSI -HEAT DIESEL TO 80F SIMOPS:HANG PERF GUNS AND ALLOW TO DRAIN 01:00 - 02:00 1.00 WHSUR P POST PJSM AND BULLHEAD FREEZE PROTECT -LINE UP DOWN KILL LINE -BULLHEAD 40 BBLS FREEZE PROTECT TO 2500'MD -2.0 BPM WITH 1800 PSI -BLOW DOWN LINES TO TIGER TANK 02:00 - 03:00 1.00 WHSUR P POST RIG DOWN FLOOR FROM PERFORATORS -OFFLOAD GUNS AND PERFORATING EQUIPMENT -CLEAN AND CLEAR FLOOR -PU INJECTOR AND GET ON WELL SIMOPS:STAGE N2 UNIT 03:00 - 05:30 2.50 RIGD P POST PJSM AND BLOW DOWN REEL WITH N2 -STAGE AND RIG UP N2 UNIT -WSL PERFORM PRESSURE CROSSCHECK CHECKLIST WITH N2 UNIT LEAD -PRESS TEST TO 250/4500 PSI -WSL WITNESS TRIPS FUNCTION DURING PRESS TEST -CIRC WATER,CORROSION INHIBITOR, METHANOL -BLOW DOWN WITH N2,TAKE RETURNS TO TIGER TANK 05:30 - 07:30 2.00 WHSUR P POST PJSM AND GREASE TREE VALVES/INSTALL TWC -STAND BACK INJECTOR,INSTALL NIGHT CAP -OPEN WELL TO NIGHT CAP,WELL ON VAC -GREASE TREE VALVES -REMOVE NIGHT CAP,T-BAR IN TWC Printed 11/17/2014 9:59:53AM North America-ALASKA-BP Page 7 of 7 Operation Summary Report Common Well Name:02-32 AFE No Event Type:COM-ONSHORE(CON) Start Date:11/4/2014 End Date:11/7/2014 X3-015N1(1,358,797.00) Project:Prudhoe Bay Site:PB DS 02 Rig Name/No.:NORDIC 2 Spud Date/Time:2/22/2002 12:00:00AM Rig Release:11/7/2014 Rig Contractor:NORDIC CALISTA UWI:500292220900 Active datum:ORIG KELLY BUSHING©69.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:30 - 10:00 2.50 WHSUR P POST PJSM AND PULL BACK COIL -CUT OFF CTC,BOOT E-LINE -DRESS COIL END AND INSTALL GRAPPLE -PULL TEST TO 4K#AND RE-TIGHTEN -PULL BACK COIL -SECURE COIL TO SHIPPING BAR AND PREP REEL TO LOWER EMPTY AND RINSE OUT PITS -STAB ON WELL,REMOVE INJECTOR GOOSENECK,REMOVE INJECTOR FROM PACKOFF ASSEMBLY,SET INJECTOR ON BELLY,SET PACKFFS ON STAND 10:00 - 13:30 3.50 WHSUR P POST NIPPLE DOWN BOPS -INSTALL NIGHT CAP AND BLOW DOWN BOP STACK -OPEN BOP DOORS AND CHANGE OUT RAMS 1 FOR 2"COIL -ND LUBRICATOR AND HANG STACK FROM BLOCKS -NIPPLE DOWN BOPS SIMOPS:PJSM LOWER REEL TO TRAILER W 13:30 - 14:30 1.00 ! WHSUR I P I POST NU TREE CAP 'CONTINUE PRESSURE WASH PITS 14:30 - 16:30 2.00 WHSUR P POST PRESS TEST TREE CAP TO 250/3500 PSI FOR 5/5 MIN CONTINUE TO PRESSURE WASH PITS 16:30 - 18:00 1.50 WHSUR P POST CONTINUE PRESSURE WASH AND SUCK OUT PITS. RELEASE NORDIC 2 CTD RIG AND END COMPLETION EVENT AT 18:00 ON 11/07/2014. PREP RIG TO MOVE TO DS 15-28B. REMOVE LO/TO ON WELLS 02-01 AND 02-31. ALL TREE AND WELLHEAD VALVE LEFT CLOSED WITH PRESSURE GAUGES. FINAL OA/IA PRESS=0/100 PSI. TREE,WELLHEAD,AND CELLAR CLEAN. WELLWORK TRANSFER PERMIT CLOSED WITH PAD OPERATOR. WELL HANDOVER COMPLETED WITH WELLS GROUP. RELEASE CTD RIG NORDIC 2 FROM 02-32C AT 18:00 Printed 11/17/2014 9:59 53AM 02-32C, Well History (Post-Rig Sidetrack) Date Summary 11/10/14 T/I/O=TWC/0/0. Torqued tree flanges to API specs. Removed TS#06. Installed tree cap assembly. PT'd tree to API specs. (PASSED). Pulled TWC#291. RDMO. Final WHP's =200/0/0. 11/27/14 DRIFT TO DEV. @ 9,170' SLM, W/2.25" CENT, SAMPLE BAILER. MADE TWO PASSES W/PDS 24 ARM CALIPER FROM 9170'SLM TO 8800'SLM (good data). RAN 17'x3.78" LTP DRIFT(good ring on brass indicators). 11/28/14 T/I/O = 1500/260/10. Temp= SI. IA FL(Slickline call in). No AL. IA FL @ 190' (10 bbls). SV, WV, SSV, MV= SLB. IA, OA=OTG. 11/28/14 SET BAKER 45 FLOGARD LTP (15.86'oal) @ 8,960'SLM. RAN PDS 24 ARM CALIPER FROM 9,164' SLM TO 8,880'SLM (good data). SET 4-1/2"X CATCHER SUB @ 8,235' SLM (8,258' MD) PULL RK-DGLV FROM ST#2 @ 6,004'SLM (6,021' MD)&STA#3 @ 3,755'SLM (3,772' MD). SET RK- LGLV IN STA#3& RK-OGLV IN STA#2. PULLED BKR 45 KB LTP FROM 8960' SLM (8988' MD) BRUSH DEPLOYMENT SLEEVE @ 8960' SLM. 11/28/14 T/I/O=?/317/vac. Temp=Sl Assist S-line, Load well, MIT-TBG ( Post CTD) Safety drill. RU. 11/29/14 Assist Slickline (CTU) MIT-T 3000 psi""PASSED"" Pumped 5 bbls, 15*neat meth spear followed by 225 bbls, 100*crude down TBG to load. Slickline running in hole to set LT Plug. Pumped 11 bbls of 70* crude to Assist S-line with shearing off LTP& pumped 2 bbls of 70`crude to see if prong set Pumped 1.75 bbls of 70*crude to reach 3000 psi for MIT TBG 1st test 1st 15 min lost 91 psi 2nd 15 min lost 41 psi for a total of 132 psi in 30 min Bleed TP down bleed back aprox 4 bbls S-line on well on dep wing shut swab open ssv open master open casing valves open to gauges tag hung Final Whp's=225/362/1. 11/29/14 LRS LOADED TBG W/225 BBLS OF CRUDE. SET 4-1/2" D&D STINGER ASSEMBLY(3.725" OD, OAL 177", W/2-7/8" PX PLUG BODY 4x 3/16" ports in stinger) @ 8,960' SLM (8,977' MD). SET 4-1/2" G- PACK OFF (3.72" OD &OAL 45") © 8,952' SLM (8,973' MD). SET 4-1/2"TBG STOP (oal 20.5", o.d.=3.72")@ 8,951' SLM (8,972' MD). SET P-PRONG (3/8"f.n., body o.d.= 1-1/2", 84" oal) @ 8,963' SLM (8,988' MD). LRS PERFORMED PASSING MIT-T TO 3,000psi. PULLED P-PRONG FROM 8,963' SLM (8,988' MD). PULLED PX-PLUG FROM 8,963' SLM (8,988' MD). Page 1 of 1 Øbp North America - ALASKA - BP Prudhoe Bay PB DS 02 02-32 500292220900 02-32CPB1 Design: 02-32CPB1 Survey Report - Geographic 25 November, 2014 ml BAKER HUGHES 1,4 0 by Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B:) Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Well: 02-32 North Reference: True Wellbore: 02-32CPB1 Survey Calculation Method: Minimum Curvature Design: 02-32CPB1 Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 02,TR-11-14 Site Position: Northing: 5,948,800.37 usft Latitude: 70°15'53.847 N From: Map Easting: 687,638.44 usft Longitude: 148°28'58.06 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.43° Well 02-32 API No. 500292220900 Well Position +N/-S 0.00 usft Northing: 5,951,220.20 usft Latitude: 70°16'17.683 N +E/-W 0.00 usft Easting: 687,466.07 usft Longitude: 148°29'1.32 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 30.60 usft Wellbore 02-32CPB1 API no. 500292220973 Magnetics Model Name Sample Date Declination Dip Angle Field Strength 1°) (°) (nT) BGGM2014 10/24/2014 19.68 81.01 57,601 Design 02-32CPB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,231.72 Vertical Section: Depth From(ND) +N/-S +E/-W Direction (usft) (usft) (usft) (°) 26.00 0.00 0.00 38.23 Survey Program Date: 11/25/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 187.60 6,564.60 1 :MWD-Standard(02-32) MWD MWD-Standard 6,621.00 9,231.72 2-32B IFR(02-32B) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 9,257.00 9,330.18 Inc+Trend(02-32CPB1) INC+TREND Inclinometer+known azi trend 9,350.06 10,956.16 MWD(02-32CPB1) MWD MWD-Standard 11/25/2014 9:26:14AM Page 2 COMPASS 5000.1 Build 61 • ri- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B:) Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Well: 02-32 North Reference: True Wellbore: 02-32CPB1 Survey Calculation Method: Minimum Curvature Design: 02-32CPB1 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,231.72 67.11 351.54 8,834.48 1,226.11 -310.87 5,952,438.11 687,124.77 70°16'29.741 N 148°29'10.37 W TIP 9,257.00 67.88 352.20 8,844.16 1,249.23 -314.18 5,952,461.14 687,120.90 70°16'29.969 N 148°29'10.47 W KOP 9,277.93 69.26 354.89 8,851.81 1,268.58 -316.36 5,952,480.43 687,118.23 70°16'30.159 N 148°29'10.53 W Interpolated Azimuth 9,303.80 72.74 358.09 8,860.23 1,292.99 -317.85 5,952,504.80 687,116.13 70°16'30.399 N 148°29'10.58 W Interpolated Azimuth 9,330.18 77.43 1.24 8,867.02 1,318.47 -317.99 5,952,530.26 687,115.35 70°16'30.650 N 148°29'10.58 W Interpolated Azimuth 9,350.06 80.75 3.56 8,870.78 1,337.97 -317.17 5,952,549.78 687,115.69 70°16'30.842 N 148°29'10.56 W 9,383.01 80.90 4.28 8,876.03 1,370.42 -314.95 5,952,582.27 687,117.10 70°16'31.161 N 148°29'10.49 W 9,410.24 81.46 9.34 8,880.21 1,397.13 -311.76 5,952,609.05 687,119.63 70°16'31.423 N 148°29'10.40 W 9,434.44 81.95 12.99 8,883.70 1,420.62 -307.12 5,952,632.65 687,123.67 70°16'31.654 N 148°29'10.26 W 9,470.41 81.70 18.90 8,888.82 1,454.84 -297.35 5,952,667.10 687,132.59 70°16'31.991 N 148°29'9.98 W 9,500.16 81.37 23.25 8,893.21 1,482.29 -286.77 5,952,694.80 687,142.49 70°16'32.261 N 148°29'9.67 W 9,530.08 82.15 27.52 8,897.50 1,509.04 -274.08 5,952,721.85 687,154.51 70°16'32.524 N 148°29'9.30 W 9,561.64 84.50 33.13 8,901.17 1,536.08 -258.26 5,952,749.28 687,169.65 70°16'32.790 N 148°29'8.84 W' 9,590.11 85.67 38.50 8,903.61 1,559.07 -241.66 5,952,772.67 687,185.66 70°16'33.016 N 148°29'8.36 W 9,620.05 85.88 44.06 8,905.81 1,581.50 -221.97 5,952,795.59 687,204.79 70°16'33.237 N 148°29'7.78 W 9,650.51 87.33 49.89 8,907.62 1,602.24 -199.75 5,952,816.87 687,226.48 70°16'33.441 N 148°29'7.14 W 9,680.50 88.00 54.76 8,908.84 1,620.55 -176.04 5,952,835.76 687,249.73 70°16'33.621 N 148°29'6.45 W 9,710.40 89.66 60.19 8,909.45 1,636.61 -150.85 5,952,852.45 687,274.51 70°16'33.779 N 148°29'5.71 W 9,740.57 88.71 67.25 8,909.88 1,649.96 -123.82 5,952,866.46 687,301.20 70°16'33.910 N 148°29'4.93 W 9,770.78 88.53 72.93 8,910.61 1,660.24 -95.43 5,952,877.45 687,329.32 70°16'34.011 N 148°29'4.10 W 9,800.48 88.77 78.78 8,911.31 1,667.49 -66.65 5,952,885.41 687,357.91 70°16'34.083 N 148°29'3.26 W 9,830.48 87.76 86.40 8,912.22 1,671.36 -36.94 5,952,890.02 687,387.51 70°16'34.121 N 148°29'2.40 W 9,860.54 88.25 92.48 8,913.27 1,671.65 -6.91 5,952,891.06 687,417.52 70°16'34.123 N 148°29'1.52 W 9,905.53 86.71 99.93 8,915.25 1,666.80 37.74 5,952,887.32 687,462.28 70°16'34.076 N 148°29'0.22 W 9,921.64 86.90 103.44 8,916.15 1,663.54 53.49 5,952,884.46 687,478.10 70°16'34.044 N 148°28'59.76 W 9,954.53 88.80 110.15 8,917.38 1,654.05 84.93 5,952,875.75 687,509.77 70°16'33.950 N 148°28'58.85 W 9,982.69 89.79 116.35 8,917.73 1,642.94 110.79 5,952,865.29 687,535.90 70°16'33.841 N 148°28'58.09 W 10,000.53 88.28 117.93 8,918.03 1,634.80 126.66 5,952,857.55 687,551.97 70°16'33.761 N 148°28'57.63 W 10,025.53 88.31 114.72 8,918.77 1,623.72 149.06 5,952,847.03 687,574.63 70°16'33.652 N 148°28'56.98 W 10,057.79 87.85 111.06 8,919.86 1,611.18 178.76 5,952,835.24 687,604.63 70°16'33.529 N 148°28'56.12 W 10,095.44 87.73 110.55 8,921.31 1,597.82 213.92 5,952,822.76 687,640.12 70°16'33.397 N 148°28'55.09 W 10,125.51 88.19 114.93 8,922.38 1,586.21 241.63 5,952,811.84 687,668.10 70°16'33.283 N 148°28'54.28 W 10,155.40 89.60 120.92 8,922.96 1,572.22 268.02 5,952,798.51 687,694.83 70°16'33.145 N 148°28'53.52 W 10,185.42 87.32 124.32 8,923.76 1,556.05 293.29 5,952,782.97 687,720.50 70°16'32.986 N 148°28'52.78 W 10,215.79 86.62 128.66 8,925.37 1,538.01 317.67 5,952,765.56 687,745.31 70°16'32.809 N 148°28'52.07 W 10,245.62 87.36 132.97 8,926.94 1,518.55 340.21 5,952,746.66 687,768.33 70°16'32.618 N 148°28'51.41 W 10,275.71 90.12 135.30 8,927.60 1,497.60 361.80 5,952,726.26 687,790.43 70°16'32.412 N 148°28'50.79 W 10,301.35 88.74 137.18 8,927.85 1,479.09 379.53 5,952,708.19 687,808.62 70°16'32.229 N 148°28'50.27 W 10,336.20 88.53 131.52 8,928.68 1,454.74 404.43 5,952,684.48 687,834.12 70°16'31.990 N 148°28'49.54 W 10,366.11 89.79 127.20 8,929.12 1,435.78 427.55 5,952,666.10 687,857.70 70°16'31.804 N 148°28'48.87 W 10,395.73 90.49 126.46 8,929.05 1,418.03 451.26 5,952,648.94 687,881.84 70°16'31.629 N 148°28'48.18 W 10,425.90 91.04 130.25 8,928.65 1,399.31 474.91 5,952,630.82 687,905.95 70°16'31.445 N 148°28'47.49 W 10,452.32 90.71 133.28 8,928.24 1,381.72 494.61 5,952,613.72 687,926.08 70°16'31.272 N 148°28'46.92 W 10,480.65 90.18 136.73 8,928.02 1,361.69 514.64 5,952,594.20 687,946.60 70°16'31.075 N 148°28'46.34 W 10,510.64 87.85 140.24 8,928.54 1,339.24 534.51 5,952,572.26 687,967.02 70°16'30.854 N 148°28'45.76 W 10,540.78 87.08 144.14 8,929.87 1,315.45 552.96 5,952,548.94 687,986.06 70°16'30.620 N 148°28'45.22 W 10,570.27 87.73 148.29 8,931.21 1,290.98 569.34 5,952,524.88 688,003.05 70°16'30.379 N 148°28'44.74 W 10,600.80 86.96 152.90 8,932.62 1,264.41 584.31 5,952,498.70 688,018.67 70°16'30.118 N 148°28'44.31 W 10,630.99 89.20 158.71 8,933.64 1,236.91 596.67 5,952,471.51 688,031.71 70°16'29.847 N 148°28'43.95 W 11/25/2014 9:26:14AM Page 3 COMPASS 5000.1 Build 61 • FS"- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B:) Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Well: 02-32 North Reference: True Wellbore: 02-32CPB1 Survey Calculation Method: Minimum Curvature Design: 02-32CPB1 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-5 +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 10,660.78 87.57 163.54 8,934.48 1,208.74 606.30 5,952,443.59 688,042.04 70°16'29.570 N 148°28'43.67 W 10,690.41 88.31 168.37 8,935.54 1,180.02 613.49 5,952,415.06 688,049.94 70°16'29.288 N 148°28'43.46 W 10,720.78 87.42 173.01 8,936.67 1,150.08 618.39 5,952,385.26 688,055.59 70°16'28.994 N 148°28'43.32 W 10,753.44 85.54 175.51 8,938.68 1,117.65 621.65 5,952,352.92 688,059.66 70°16'28.675 N 148°28'43.22 W 10,780.78 83.75 172.38 8,941.23 1,090.58 624.52 5,952,325.94 688,063.20 70°16'28.408 N 148°28'43.14 W 10,810.88 83.29 167.71 8,944.63 1,061.14 629.69 5,952,296.63 688,069.10 70°16'28.119 N 148°28'42.99 W 10,840.32 83.75 163.93 8,947.95 1,032.78 636.86 5,952,268.46 688,076.97 70°16'27.840 N 148°28'42.78 W 10,870.08 83.54 159.30 8,951.25 1,004.72 646.18 5,952,240.64 688,086.99 70°16'27.564 N 148°28'42.51 W 10,900.18 80.72 159.06 8,955.37 976.85 656.78 5,952,213.05 688,098.27 70°16'27.290 N 148°28'42.20 W 10,930.01 76.91 158.75 8,961.16 949.56 667.31 5,952,186.03 688,109.48 70°16'27.021 N 148°28'41.89 W 10,956.16 73.47 159.31 8,967.84 925.95 676.36 5,952,162.66 688,119.11 70°16'26.789 N 148°28'41.63 W 11,007.00 73.47 159.31 8,982.30 880.36 693.58 5,952,117.51 688,137.46 70°16'26.341 N 148°28'41.13 W Projection to TD 11/25/2014 9:26:14AM Page 4 COMPASS 5000.1 Build 61 0 by North America - ALASKA - BP Prudhoe Bay PB DS 02 02-32 500292220900 02-32C Design: 02-32C Survey Report - Geographic 05 November, 2014 r' 1 BAKER HUGHES •4' 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B:) Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Well: 02-32 North Reference: True Wellbore: 02-32C Survey Calculation Method: Minimum Curvature Design: 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 02,TR-11-14 Site Position: Northing: 5,948,800.37 usft Latitude: 70°15'53.847 N From: Map Easting: 687,638.44 usft Longitude: 148°28'58.06 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.43° Well 02-32 API No. 500292220900 Well Position +N/-S 0.00 usft Northing: 5,951,220.20 usft Latitude: 70°16'17.683 N +El-W 0.00 usft Easting: 687,466.07 usft Longitude: 148°29'1.32 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 30.60 usft Wellbore 02-32C API no. 500292220903 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (0) (0) (nT) BGGM2014 10/24/2014 19.68 81.01 57,601 Design 02-32C Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,009.14 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (0) 26.00 0.00 0.00 94.64 Survey Program Date: 11/5/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 187.60 6,564.60 1 :MWD-Standard(02-32) MWD MWD-Standard 6,621.00 9,009.14 2-32B IFR(02-32B) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 9,041.00 9,160.49 Inc+Trend(02-32C) INC+TREND Inclinometer+known azi trend 9,191.74 11,836.26 MWD(02-32C) MWD MWD-Standard 11/5/2014 2:18:32PM Page 2 COMPASS 5000.1 Build 61 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B:) Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Well: 02-32 North Reference: True Wellbore: 02-32C Survey Calculation Method: Minimum Curvature Design: 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,009.14 51.44 352.24 8,721.13 1,037.28 -284.27 5,952,250.01 687,156.07 70°16'27.884 N 148°29'9.60 W TIP 9,041.00 53.46 351.69 8,740.55 1,062.29 -287.80 5,952,274.92 687,151.92 70°16'28.130 N 148°29'9.70 W KOP 9,070.35 57.33 351.59 8,757.21 1,086.18 -291.31 5,952,298.72 687,147.81 70°16'28.365 N 148°29'9.80 W Interpolated Azimuth 9,100.32 62.75 351.48 8,772.18 1,111.86 -295.13 5,952,324.29 687,143.35 70°16'28.618 N 148°29'9.91 W Interpolated Azimuth 9,130.32 68.92 351.39 8,784.45 1,138.91 -299.21 5,952,351.23 687,138.61 70°16'28.884 N 148°29'10.03 W Interpolated Azimuth 9,160.49 75.87 351.29 8,793.57 1,167.32 -303.53 5,952,379.53 687,133.57 70°16'29.163 N 148°29'10.16 W Interpolated Azimuth 9,191.74 82.19 351.21 8,799.51 1,197.63 -308.20 5,952,409.71 687,128.16 70°16'29.461 N 148°29'10.29 W 9,220.46 89.39 352.52 8,801.62 1,225.96 -312.25 5,952,437.93 687,123.40 70°16'29.740 N 148°29'10.41 W 9,250.43 92.42 359.10 8,801.15 1,255.83 -314.44 5,952,467.73 687,120.47 70°16'30.034 N 148°29'10.48 W 9,281.95 90.46 2.56 8,800.36 1,287.33 -313.98 5,952,499.23 687,120.14 70°16'30.344 N 148°29'10.46 W 9,310.56 90.09 9.26 8,800.22 1,315.77 -311.03 5,952,527.73 687,122.38 70°16'30.623 N 148°29'10.38 W 9,341.20 91.23 16.85 8,799.86 1,345.59 -304.12 5,952,557.72 687,128.55 70°16'30.917 N 148°29'10.18 W 9,370.65 89.05 24.13 8,799.79 1,373.16 -293.82 5,952,585.53 687,138.16 70°16'31.188 N 148°29'9.88 W 9,402.86 91.66 31.30 8,799.59 1,401.65 -278.85 5,952,614.39 687,152.41 70°16'31.468 N 148°29'9.44 W 9,430.35 90.95 36.87 8,798.97 1,424.41 -263.45 5,952,637.52 687,167.23 70°16'31.692 N 148°29'8.99 W 9,460.15 89.82 42.52 8,798.77 1,447.32 -244.43 5,952,660.90 687,185.68 70°16'31.917 N 148°29'8.44 W 9,484.89 89.72 48.73 8,798.86 1,464.62 -226.75 5,952,678.63 687,202.92 70°16'32.087 N 148°29'7.92 W 9,514.90 92.18 51.89 8,798.37 1,483.78 -203.67 5,952,698.35 687,225.52 70°16'32.276 N 148°29'7.25 W 9,544.80 89.14 54.47 8,798.02 1,501.69 -179.74 5,952,716.86 687,248.99 70°16'32.452 N 148°29'6.55 W' 9,570.07 89.39 56.79 8,798.35 1,515.95 -158.88 5,952,731.64 687,269.48 70°16'32.592 N 148°29'5.95 W 9,600.05 88.65 59.93 8,798.86 1,531.68 -133.37 5,952,747.99 687,294.60 70°16'32.747 N 148°29'5.20 W 9,630.76 87.05 62.92 8,800.01 1,546.35 -106.42 5,952,763.33 687,321.17 70°16'32.891 N 148°29'4.42 W 9,660.47 88.56 67.37 8,801.15 1,558.83 -79.49 5,952,776.47 687,347.78 700 16'33.014 N 148°29'3.64 W 9,690.58 89.26 71.95 8,801.72 1,569.29 -51.27 5,952,787.63 687,375.73 70°16'33.117 N 148°29'2.81 W 9,720.69 89.48 77.01 8,802.05 1,577.34 -22.27 5,952,796.40 687,404.52 70°16'33.196 N 148°29'1.97 W 9,750.58 88.59 82.54 8,802.56 1,582.65 7.13 5,952,802.44 687,433.78 70°16'33.248 N 148°29'1.11 W 9,780.61 88.19 87.03 8,803.40 1,585.37 37.02 5,952,805.91 687,463.58 70°16'33.275 N 148°29'0.24 W 9,810.57 88.46 92.82 8,804.28 1,585.41 66.95 5,952,806.69 687,493.51 70°16'33.275 N 148°28'59.37 W 9,840.64 88.53 98.30 8,805.07 1,582.50 96.86 5,952,804.53 687,523.47 70°16'33.247 N 148°28'58.50 W 9,870.76 88.65 103.37 8,805.81 1,576.84 126.42 5,952,799.61 687,553.17 70°16'33.191 N 148°28'57.64 W 9,900.97 88.50 108.82 8,806.56 1,568.47 155.43 5,952,791.96 687,582.37 70°16'33.109 N 148°28'56.80 W 9,930.74 88.25 114.35 8,807.41 1,557.53 183.09 5,952,781.71 687,610.29 70°16'33.001 N 148°28'55.99 W 9,961.01 89.05 120.24 8,808.12 1,543.66 209.97 5,952,768.52 687,637.51 70°16'32.865 N 148°28'55.21 W 9,991.21 88.50 126.18 8,808.77 1,527.13 235.22 5,952,752.62 687,663.16 70°16'32.702 N 148°28'54.47 W 10,022.17 87.97 123.64 8,809.72 1,509.42 260.59 5,952,735.55 687,688.97 70°16'32.528 N 148°28'53.73 W 10,050.67 88.56 121.47 8,810.58 1,494.09 284.60 5,952,720.83 687,713.35 70°16'32.377 N 148°28'53.03 W 10,080.59 88.89 118.92 8,811.25 1,479.05 310.45 5.952,706.44 687,739.57 70°16'32.229 N 148°28'52.28 W 10,112.23 90.03 123.34 8,811.55 1,462.70 337.53 5,952,690.76 687,767.04 70°16'32.068 N 148°28'51.49 W 10,140.53 88.74 127.63 8,811.85 1,446.28 360.57 5,952,674.92 687,790.48 70°16'31.907 N 148°28'50.82 W 10,170.53 89.69 132.70 8,812.26 1,426.94 383.48 5,952,656.16 687,813.87 70°16'31.717 N 148°28'50.15 W 10,201.13 89.11 137.85 8,812.58 1,405.20 405:01 5,952,634.97 687,835.92 70°16'31.503 N 148°28'49.53 W 10,231.11 86.99 141.10 8,813.61 1,382.43 424.47 5,952,612.69 687,855.95 70°16'31.279 N 148°28'48.96 W 10,260.33 81.30 142.63 8,816.58 1,359.58 442.41 5,952,590.30 687,874.46 70°16'31.054 N 148°28'48.44 W 10,294.43 73.33 141.89 8,824.07 1,333.29 462.76 5,952,564.52 687,895.45 70°16'30.796 N 148°28'47.85 W 10,326.20 65.72 142.67 8,835.17 1,309.77 480.96 5,952,541.46 687,914.23 70°16'30.564 N 148°28'47.32 W 10,350.61 59.21 144.19 8,846.45 1,292.40 493.85 5,952,524.42 687,927.55 70°16'30.393 N 148°28'46.94 W 10,375.10 52.00 142.14 8,860.28 1,276.23 505.95 5,952,508.56 687,940.04 70°16'30.234 N 148°28'46.59 W 10,400.07 48.42 138.58 8,876.26 1,261.45 518.17 5,952,494.09 687,952.63 70°16'30.089 N 148°28'46.23 W 11/5/2014 2:18.32PM Page 3 COMPASS 5000.1 Build 61 • IN- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B:) Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Well: 02-32 North Reference: True Wellbore: 02-32C Survey Calculation Method: Minimum Curvature Design: 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +EI-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 10,429.73 54.58 135.35 8,894.72 1,244.52 534.02 5,952,477.56 687,968.89 70°16'29.922 N 148°28'45.77 W 10,460.33 61.38 134.17 8,910.93 1,226.27 552.44 5,952,459.77 687,987.76 70°16'29.743 N 148°28'45.24 W 10,490.36 70.01 134.19 8,923.28 1,207.21 572.05 5,952,441.21 688,007.84 70°16'29.555 N 148°28'44.66 W 10,523.11 78.24 133.44 8,932.23 1,185.42 594.76 5,952,420.00 688,031.08 70°16'29.341 N 148°28'44.00 W 10,554.18 88.68 134.07 8,935.76 1,164.10 617.02 5,952,399.24 688,053.87 70°16'29.131 N 148°28'43.35 W 10,579.71 89.57 137.61 8,936.15 1,145.79 634.80 5,952,381.38 688,072.10 70°16'28.951 N 148°28'42.84 W 10,614.88 88.43 141.74 8,936.77 1,118.99 657.56 5,952,355.15 688,095.51 70°16'28.688 N 148°28'42.17 W 10,658.36 87.11 147.83 8,938.46 1,083.51 682.60 5,952,320.31 688,121.43 70°16'28.339 N 148°28'41.45 W 10,691.76 87.64 153.77 8,939.99 1,054.40 698.87 5,952,291.62 688,138.42 70°16'28.052 N 148°28'40.97 W 10,718.60 87.33 158.54 8,941.17 1,029.88 709.70 5,952,267.38 688,149.86 70°16'27.811 N 148°28'40.66 W 10,748.28 86.96 162.75 8,942.65 1,001.92 719.53 5,952,239.67 688,160.37 70°16'27.536 N 148°28'40.37 W 10,778.35 86.65 167.65 8,944.33 972.90 727.19 5,952,210.86 688,168.76 70°16'27.251 N 148°28'40.15 W 10,808.36 87.42 170.14 8,945.88 943.50 732.97 5,952,181.60 688,175.26 70°16'26.962 N 148°28'39.98 W 10,838.44 88.43 173.81 8,946.97 913.74 737.16 5,952,151.96 688,180.20 70°16'26.669 N 148°28'39.86 W 10,868.45 88.10 178.77 8,947.88 883.81 739.10 5,952,122.10 688,182.88 70°16'26.375 N 148°28'39.80 W 10,898.80 89.39 179.86 8,948.54 853.47 739.46 5,952,091.78 688,184.00 70°16'26.076 N 148°28'39.79 W 10,928.43 88.62 175.52 8,949.06 823.88 740.66 5,952,062.22 688,185.93 70°16'25.785 N 148°28'39.76 W 10,962.26 88.68 171.41 8,949.86 790.29 744.51 5,952,028.74 688,190.62 70°16'25.455 N 148°28'39.64 W 10,988.06 89.69 168.88 8,950.22 764.87 748.92 5,952,003.44 688,195.66 70°16'25.205 N 148°28'39.52 W 11,018.61 88.62 166.20 8,950.67 735.05 755.51 5,951,973.79 688,202.99 70°16'24.912 N 148°28'39.32 W 11,048.01 88.03 162.32 8,951.53 706.77 763.48 5,951,945.72 688,211.66 70°16'24.633 N 148°28'39.09 W 11,078.72 87.51 158.69 8,952.73 677.84 773.72 5,951,917.07 688,222.62 70°16'24.349 N 148°28'38.79 W 11,108.33 89.08 154.59 8,953.61 650.68 785.45 5,951,890.20 688,235.02 70°16'24.082 N 148°28'38.45 W 11,137.87 89.23 150.02 8,954.05 624.53 799.18 5,951,864.41 688,249.39 70°16'23.825 N 148°28'38.05 W 11,168.58 88.96 145.97 8,954.53 598.50 815.45 5,951,838.79 688,266.31 70°16'23.569 N 148°28'37.58 W 11,198.92 88.99 142.67 8,955.07 573.86 833.14 5,951,814.60 688,284.61 70°16'23.326 N 148°28'37.06 W 11,228.78 88.77 145.27 8,955.66 549.72 850.70 5,951,790.91 688,302.76 70°16'23.089 N 148°28'36.55 W 11,259.18 88.77 150.00 8,956.31 524.06 866.96 5,951,765.66 688,319.66 70°16'22.836 N 148°28'36.08 W 11,288.62 89.54 153.86 8,956.74 498.09 880.81 5,951,740.04 688,334.15 70°16'22.581 N 148°28'35.68 W 11,318.76 90.25 161.02 8,956.80 470.27 892.37 5,951,712.53 688,346.39 70°16'22.307 N 148°28'35.34 W 11,348.86 89.79 162.05 8,956.79 441.72 901.90 5,951,684.22 688,356.63 70°16'22.027 N 148°28'35.06 W 11,379.00 89.69 164.03 8,956.93 412.90 910.69 5,951,655.63 688,366.14 70°16'21.743 N 148°28'34.81 W 11,408.85 89.60 167.91 8,957.11 383.94 917.93 5,951,626.86 688,374.09 70°16'21.458 N 148°28'34.60 W 11,439.07 88.47 169.27 8,957.62 354.33 923.90 5,951,597.41 688,380.81 70°16'21.167 N 148°28'34.42 W 11,469.78 88.74 174.08 8,958.37 323.96 928.35 5,951,567.16 688,386.00 70°16'20.868 N 148°28'34.29 W 11,502.18 89.08 178.09 8,958.98 291.65 930.56 5,951,534.92 688,389.02 70°16'20.551 N 148°28'34.23 W 11,529.83 89.63 182.56 8,959.30 264.00 930.40 5,951,507.28 688,389.55 70°16'20.279 N 148°28'34.23 W 11,559.74 90.95 188.43 8,959.14 234.25 927.54 5,951,477.46 688,387.43 70°16'19.986 N 148°28'34.32 W 11,592.70 90.43 194.24 8,958.75 201.95 921.06 5,951,445.01 688,381.76 70°16'19.668 N 148°28'34.51 W 11,621.08 89.51 201.62 8,958.76 174.96 912.33 5,951,417.82 688,373.71 70°16'19.403 N 148°28'34.76 W 11,651.17 88.62 205.57 8,959.25 147.40 900.29 5,951,389.97 688,362.36 70°16'19.132 N 148°28'35.11 W 11,682.23 88.00 202.74 8,960.17 119.07 887.59 5,951,361.34 688,350.37 70°16'18.853 N 148°28'35.48 W 11,711.85 86.90 197.76 8,961.49 91.32 877.35 5,951,333.34 688,340.82 70°16'18.580 N 148°28'35.78 W 11,740.75 87.18 194.70 8,962.98 63.61 869.29 5,951,305.44 688,333.45 70°16'18.308 N 148°28'36.01 W 11,772.32 88.07 190.86 8,964.29 32.86 862.31 5,951,274.52 688,327.24 70°16'18.005 N 148°28'36.22 W 11,802.18 87.60 185.74 8,965.42 3.34 858.00 5,951,244.91 688,323.67 70°16'17.715 N 148°28'36.34 W 11,836.26 86.74 183.36 8,967.10 -30.59 855.30 5,951,210.93 688,321.82 70°16'17.381 N 148°28'36.42 W 11,875.00 86.74 183.36 8,969.30 - -69.20 853.04 5,951,172.27 688,320.51 70°16'17.002 N 148°28'36.49 W Projection to TD 11/5/2014 2:18:32PM Page 4 COMPASS 5000.1 Build 61 0 N p O L N ai 'Cr' co a) H a) N O co CO LU ` c3 LL J o- n. N V N 2 a n 2' 2 0 C E E W W 0 O O N WCV 0 0 .� U H C d ILo Q C N L o U O U o J '611 CV 0r m H w O Q m U Lv 0 ' O W U 0 o Uv J U > >U) U) N Ca)O f:2' YaJ _ 7 7.,m Q ¢ u aaV cc O E QO o 0 o o ao )n o - ELLN W a LiU 0 0 0 0 0 OJO O UQ O y N 0 O2 2 O O N 0 0N 3 OO x N 0 0 N o co ' a) a) a E t 2 2 O In N j m o N 'y 2 "y N E co a) I, In a C x C .-. n I,-- E r) c a) m x E L c sr F co 0 2 0 W O O 0 N E N O a) U C o @ o Z E r O Z U" di H Co o 'O W p E b p a 3 m o O a) nLL c%) 2 o s- 0 ix fA ¢ - oi X a ~ r -O N a) o LL a' N L > N -o c CO CC U) E o)m U °) co o E) a) IL. Uc Na E d U U) J o 0 > J • I- O M N O N co C n C t N a C O) j - a) a) E C u E O N u) n U d d N > < o Q v) LL CO ai n° 00 n > o L m " C j E o rn p o O. co S' c v o n o t n u) W 2 0 O C C C _ d N N > O) O C Q ce m 10 N L0 a' 3 o a) Lo) Z i o a E E H _ Q DI E m E o 0 LL Lu V) a > w U U H O ' _ _ N n om" :. U = Ali z 'O L «. 3 D. - Q , LL o 2 = d LL O N 0 E Im y E Q E o N ,� o Q d 1y (7 r. -� Q N n L U N JID LL iii r: cL 3 n U W - 0 LL Z v p Y Y (7 OO0Z .- ^ a a o• a m a :v 0 NacoO aO coNv .. O U N co. CO O� O O dLLO cO E (N O t•-• a0 'O E j (nZ O c In N N T N N °..1 0 d N o N 0, I E E d m O a d a LL r Z > 0 to N r0 co U Ln Ln 2' Q o u) C N .o .) N O 70 co EC ~ H > 0> > O� W LL . N IP T13 C 1....0 ¢ Z Y u) o U 5 H a) a)a) 2 Q O0 U Lu o ¢ o 0 0 t co u_ LU U H S E LL 0 cn m o -- ¢ 0 0 u' cC E, LL W _ Q Q' Z H Y O v W J Z U N O O] Z W N O O W O 2 Yu^i 0 CO ,..7 rn z m H w 0 g H z rn O ami v 0 LLQooao2 0 o 0 w N. mc7O Q o V'~ U Z �; ,- a)'7N 0n U LL .. H U 0- .- LL 2 O Z U @Lu W U n LL O' N E m O U 0 a) W Z H «) V pa z 012 D o LL c .. in E 0 O 0 N CO ` p a) 'O U Z N 0 tfj a) a) m 6 ) Li a `o o U E H mC ai m m E v o O -, H m ° a c c o m O 10 Ha ai 0 > o 0 -he v .9C..) E .(2. c o a) - a Z p w H r` o m ^ a IC- E > o E E o m .o- 'o a' n -o c d i, N v 0 0 L n L o co H U LL w U 2 H U c i 'a w x L'y �) a Y W O 2 <9 0 0 0 0 0 CV ) ® ® § ( � � a) co \ co as co \ � 2co 4 $ / > 0 0 \ / ) Da z CC CD \ , � � ` ) / C 3 § I-- 2 E .co - z ; _ , \ ® ) Z ± _ / t 0 z \ co I \ \ \ \ ) ) ° ƒ {To \ ! � E ee EJ z z § /as LL } � =) so- en \ za § 2 - _ & e - _ - - \ . . k } } \ ( o. ) C - e , I J / ; o / o # - a \ J � � a / / } 3 / } { ) \ )71) J \ o k ■ - - 0 $ Z ± ) ! a E 0 ! f y y § f q � E , \ a ) z - 0 a t � - 2 0 E % O » 2 > E , a k ( f 8 5 $ ƒ E ; . U) _ a. \ a ) 3 0 ( ] ) \ -C 0 / _1 = 7 « 0 f R « • cr f 0 so. a E 0 La N : cc° / q = j /k \ a { k \ _ a # - ) ; # t CO R § g § G ,EL, z a £ .. _ � % /c » ; ) ] � \ / fy & (2 / a 2 ] � # ƒ k ) 1 _ 7 SCC . 0 - ) - 2c F- \ \ ) w cL $± E /t kk � k z 3a ® 2 ' \ f# _ Cri Oi a $ , — - -CO CO I r 0 0 > z - z z a \ / G FT \ / § La » 0 _/0 \ o a) 0a) ( co 2 « 6 0 k >- 0 Cl) & \ \ \ - ) } ) \ > > ( o a e = % ! a E /./ ) m 3 \ j { \ ) J / a . z C. 2 : — E a - 2 , 2 E § 0 0_ ± 0 = a ° 0 } / 0 0 § 3 0 2 x 3 r,,,,.', t. ."V"n""rs-reilallika , • 't:,l. - + v.L,Vt. " r.M.nu:are2svatal ilii:'env" kig.is`.�.sitIW".:..`efct ikte:1 +1a,i,.:_L."`.`-s.4kna... "C\FIIT.'/--- \ THE S 1 �7j4 , l _ie ' JIJ _ ` /4' `-' f'\ '- i 1 ,. , , - __ _ 3_ . '44 ' ti.`C: ! _ ,,t •," / t;f?\'I :NOR S! '.N [ A2 El I 333 Nr2c1.SEVCI i 1 r+vl HE Ancholcqe FlaraY9501-35%? C,;'-7 ; • J LF.r John McMullen 1_2,nglnecri•ng 1 calll L,ea ucr BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 02-32C BP Exploration (Alaska), Inc. Permit No: 214-117 Surface Location: 23' FSL, 740' FWL, SEC. 25, T11N, R14E, UM Bottomhole Location: 943' FNL, 1731' FWL, SEC. 36, T11N, R14E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, 4 410 David J.Mayberry Commissioner li DATED this )Ziay of August, 2014. ', STATE OF ALASKA �' f "" ALAS )IL AND GAS CONSERVATION COMM' )N A1,IS 0 5 2014 PERMIT TO DRILL 20 AAC 25.005 AOGCC 1 a.Type of work: 1 b.Proposed Well Class: IS Development Oil ❑Service-Winj • ®Single Zone 1c.Specify if well is proposed for: ❑Drill ❑Lateral ❑Stratigraphic Test ❑Development Gas 0 Service-Supply ❑Multiple Zone 0 Coalbed Gas ❑Gas Hydrates 0 Redrill ❑Reentry ❑Exploratory ❑Service-WAG ❑Service-Disp ❑Geothermal ❑Shale Gas 2.Operator Name: 5.Bond 0 Blanket ❑Single Well 11 Well Name and Number: BP Exploration(Alaska) Inc. Bond No 6194193 • PBU 02-32C • 3. Address 6.Proposed Depth. 12. Field/Pool(s) P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 12880' - TVD 8924'ss • Prudhoe Bay/Prudhoe Bay 4a.Location of Well(Governmental Section): 7.Property Designation(Lease Number): Surface: ADL 028308 23'FSL, 740'FWL, Sec.25,T11N, R14E, UM Top of Productive Horizon 8 Land Use Permit. 13 Approximate Spud Date. 1320'FSL,420'FWL, Sec.25,T11N, R14E, UM September 21,2014 Total Depth 9.Acres in Property: 14.Distance to Nearest Property: 943'FNL, 1731' FWL, Sec.36,T11N, R14E, UM 2560 23460' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 56.6' • feet 15.Distance to Nearest Well Open Surface: x 687466 y-5951220 Zone- ASP4 GL Elevation above MSL: 30.6' • feet to Same Pool• 860' 16 Deviated Wells: Kickoff Depth: 9260' feet • 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 90 degrees Downhole: 3248 `' Surface: 2368 18 Casing Program Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD ND MD ND (including stage data) 4-1/4" 3-1/2"x 3-1/4" 9.3#/6.2# L-80 STI_ Tc-ll 3930' 8950' 8627'ss 12880' 8924'ss 194 sx Class'G' x 2-7/8" /6.4# /STL 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft) Total Depth ND(ft): Plugs(measured): Effective Depth MD(ft). Effective Depth ND(ft): Junk(measured) 10802' 8914' None 10721' 8915' None Casing Length Size Cement Volume MD ND Conductor/Structural 80' 20" 11 cu yds Arcticset I 23'- 103' 23'- 103' Surface 3430' 13-3/8" 120 cu ft CS III,2552 cu ft CS III,288 cu ft Class'G' 26'-3456' 26'-3456' Intermediate 6598' 9-5/8" 2090 cu ft Class'G' 23'-6621' 23'-6620' Production Liner 2046' 7" 404 cu ft Class'G' 6461'-8506' 6461'-8336' Liner 2475' 4-1/2" 345 cu ft Class'G' 8327'- 10802' 8177'-8914' Perforation Depth MD(ft): 9470'- 10630' Perforation Depth ND(ft): 8905'-8915' 20 Attachments: 0 Property Plat 0 BOP Sketch 0 Drilling Program 0 Time vs Depth Plot ❑Shallow Hazard Analysis ❑Diverter Sketch ❑Seabed Report 0 Drilling Fluid Program 0 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date 22. I hereby certify that the foregoing is true and correct: Contact Nathan Sperry,564-4258 Printed Name Jo ' " / ; Mc v , / Title Engineering Team Leader Email Nathan.Sperry@bp corn Signatu•- , Phone 564-4711 Date /5/ Commission Use Only Permit T. %rill .2./11//7 API Number: Per it Approval Date. See cover letter for Number: 50-029-22209-03-00 \'L— 2.O\� other requirements: Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas li contained shales / Other. B o P to 5 f o 3 5-0 to /J 5 c Samples Req'd ❑Yes 12/No Mud Log Req'd 0/Yes ©No H2S Measures: Yes ❑ o Directional Survey Req'd. Yes141 No Spacing exception req'd: 0 Yes g No inclination-only svy Req'd: 0 Yes FIBI APPROVED BYE,/ APPROVED BY ` 61NIAEL THE COMMISSION Date glltjl rForm 10-401 Revised 10/2012 This p ti • Iom the date of approval(20 AAC 25.005(g)) Submit Form and Attachments In-Duplicate VLr 5/b'/l9 'Nay •/S4' ,--6-/I To: Alaska Oil & Gas Conservation Commission From: Nathan Sperry 0bp CTD Engineer Date: August 1, 2014 Re: 02-32C Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack lateral from well 02-32B by the Nordic 2 Coiled Tubing Drilling rig on or around September 21, 2014. The 02-32C sidetrack will exit through the existing 4-1/2" liner and kick off in Zone 2, targeting Zone 1A Reserves. The proposed sidetrack is a -3,620' horizontal Ivishak Zone 1 producer, which will access a -33 acre reserves target north of Drill Site 2. The lateral will be completed with a 3-1/2" X 3-1/4" X 2-7/8" L-80 liner which will be fully cemented and perforated. Rig Work(scheduled to begin September 21st, 2014) 1. MIRU and test BOPE 250 psi low and 3,500 psi high. (MASP 2,368 psi) 2. Mill 3.80"window and 10' of rathole. 3. Drill build: 4.25" OH, 410' (20 deg DLS planned). 4. Drill lateral: 4.25" OH, 3,210' (12 deg DLS planned). 5. Run 3-1/2" x 3-3/16" x 2-7/8" L-80 liner leaving TOL at-8,950' MD. 6. Pump primary cement job: 40 bbls, 15.8 ppg, TOC at TOL -8,950' MD* 7. Perform liner cleanout and RPM/GR/CCL log. 8. Perform liner lap test to 2,400 psi 9. Perforate liner based on log interpretation (-1000'). 10. Freeze protect well to 2,500' MD. 11. Set TWC; RDMO. Post-Rig Work: 1. Re-install wellhouse, flowline and pull TWC. 2. Set liner top packer with slickline if needed* 3. Set GLV's 4. Test Separator *Approved alternate plug placement if liner lap test fails per 20 AAC 25.112(i) Mud Program: • Milling/drilling: 9.5 ppg PowerVis for milling window and drilling (1098 psi over-balance). Disposal: • All Class I & II non-hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or - Pad 3 at DS 6. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >11 must go to GNI. Hole Size: • 4.25" From 9,260' MD to 12,880' MD Liner Program: • 3-1/2", 9.3 lb/ft, L-80, STL liner 8,950' MD -8,970' MD • 3-1/4", 6.2 lb/ft, L-80, TC-Il Solid liner 8,970' MD - 10,760' MD • 2-7/8", 6.4 lb/ft, L-80, STL Solid liner 10,760' MD - 12,880' MD. • A minimum of 40 bbls of 15.8 ppg cement will be used for liner cementing (TOC 8950' MD). • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional: • See attached directional plan. Maximum planned hole angle is 90°, inclination at kick off point is 67°. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property—23,460'. • Distance to nearest well within pool—860'. Logging: • MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section. • Cased hole GR/CCL/RPM logs will be run. Perforating: • SWS 2", 6 spf, perf guns, 1-1/4" CSH work string, & 2-3/8" PH6. • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti-Collision Failures: • 02-01 Center-to-center 127'. Well abandoned for 02-01A sidetrack. • 02-10A Center-to-center 191'. P&A with the 02-10B sidetrack. • 02-31A Center-to-center 243'. Shut-in for sidetrack. • 02-32B Parent well fails near KOP. Hazards: • DS 02 is not considered an H2S pad. • 02-32B had 22 ppm H2S on 2/8/2013. • The lost circulation risk in 02-09D is considered to be High with four fault crossings planned. Reservoir Pressure: • The reservoir pressure on 02-09D expected to be 3,248 psi at 8,800' TVDSS (7.1 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,368 psi. • An EMW of 8.4 ppg for this well will provide 595 psi over-balance to the reservoir. Nathan Sperry CC: Well File CTD Engineer Joseph Lastufka ItEE= 4-1/16°MCEVOY WELLI-EAD= FMC 02-32B PREVIOUSSAFE_ .ITES: WELL ANGLE&LWR 0232 310'*** ACTUATOR= OTIS INITIAL KB.Fl F 69' WELLBORE NOT SHOWN ON DIAGRAM. BF.ELEV= NA 2 [1 KOP= 6650' Max Angle= 92"@ 9970' 20"COND, — 72' 1 ' ' 2204' H4-112"HES X MP,D=3.813" Datum MD= 9291' 91.5#,H-40, Datum TVD= 8800'SS D=19.124" GAS LFT MANDRELS 13-318°CSG,68#,L-80,ID=12.415" H 3468' ST MD 'TVD DEV TYPE VLV LATCH PORT DATE 3 3772 3772 0 MMG DMY RK 0 08/04/05 L 2 6021 6021 1 MMG DMY RK 0 12/11/13 Minimum ID = 3.725" 8316' 1 7877 7774 26 KBG-2 DMY BK 0 03/06/02 4-1/2" HES XN NIPPLE 4 _ 6461• 19-5/8" BKR TIEBACK SLEEVE,D=7.75" \ 6467' H9-5/8"X 7"BKR ZXP F4(R,D=6.312" 6474' —19-5/8"X 7"BKR HMC HGR,D=6.290" 9-5/8"W PSTOCK(XX/XX/XX) —i —6621 9-5/8"CSG MILLOUT WINDOW (02-328) 6621'-6638' 9-5/8"CSG,47#,L-80,D=8.681" H —6621 ' ' 8268' —14-1/2"HES X NP,D=3.813 S X 8271' Hr X 4-1/2"BKR S-3 PKR D=3.875" 1 I 8296' —14-1/2"HES XNP,D=3.813" ' ' 8316' H4-1/2"HES XN NP,D=3.725' ? HBKR TRACK SLV,D=5.250" 4-1/2"TBG,12.6#,L-80 BT-M,.0152 bpf,co=3.958" —1 8328' 4N8328' —I4-1/2"WLEG,ID=4.000' \ 8334' —{7'X 4-1/2'BKR ZXP PKR D=4.430" 8338' -{7"X 4-1/2'BKR HMC HGR,D=4.430" 7'LNR,26#,L-80 BT-M,D=6.276' —I 8506' - PERFORATION SUMMARY REF LOG: TCP FERF ANGLE AT TOP P162F: 81"@ 9470' ?I 9410' -9480'I—DAMAGED LNR,D=2.5"(@ 9439 elm') Nate:Refer to Production DB for historical perf data SIZE SPF MH2VAL Cpn/Sgz SI-CT SQZ 2-1/2" 4 9470-9870 0 03/04/02 2-1/2" 4 10030-10630 0 03/04/02 PBTD —{ 10721' 4-1/2"LNR,12.6#,L-80,.0152 bpf,D=3.958' H 10802' '‘ DATE REV BY COMMENTS DATE REV BY CONM34TS PRLDHOE BAY UNIT 10/04191 INITIAL COMPLETION 10/07/13 JEW PJC GLV C/O(08/04/05) WELL: 02-32B 12/21/99 CTD SIDETRACK (02-3M) 12/13/13 JLS/JMD GLV C/O(12/11/13) PERNITT No: 2020230 03/06/02 D-16 RIG SIDETRACK(02-32B) 07/09/14_ JMNO D ADDEO OOUCTOR INFO AR No: 50-029-22209-02 06/11/03 CMO/TLP KB aEVATION CORRECTION SEC 25,T11 N,R14E 23'FSL&740'PAL 04/25/13 CRR/PJC DAMAGE)LNR 04/26/13 PJC REFORMAT DIAGRAM BP Exploration(Alaska) ` TREE= 4-1/16"McEVOY WE UfkD= FMC 02-32C I PREVIOUS NOTES: RK EWELL 2LWR 02@2 310' •a" ACTUATOR= OTS MAL KB.aE 69' WELLBORE NOT SHOWN ON DIAGRAM. BF.B..EV==- - NA /71 ( KOP= 6650' Mix Angle= _ .92°@ 9970' 20'CAPD -j ■ ' ` X04• 1-14-1/2"HES X Pp 13=3.813" Datum MD= 9291' 1.atum1VD= 8800'SS GAS LET MANDRELS 13-3/8'CSG,68#,L-80,113=12.415" - 3468' ST MD TVD DEV TY PE VLV 1 LATCH FORT DATE . 3 3772 3772 0 MMG DMY RK 0 08/04/05 2 6021 6021 1 MMG DMY RK 0 12/11/13 ,, ,,, A Minimum ID = 3.725" @ 8316' + 7877 7774 zs KBG2 DMY BK o 03/06/02 4-1/2" HES XN NIPPLE 6461' -19-5/8' BKR TEBACK SLEEV E,D=7-75'1 6467' -9-5/6"X 7"BKR ZX P PKR,D=6.312" 8474' 49-5/8"X 7"BKR HMC HGR,D=6290' r9-5/8"WFPSTOCK(XX/XX/XX) F-{-^6621 I9-518"CSG,47#,L-80,D=8.681' Hi -6621 I 9 5/6'CSG MLLOUT WNDOW (02-32B) 6621'-6638' 8268' H4-1/2"HES X PP,D=3.813" S 8271' 7'X 4-1/2'BKR S-3 PKR,D=3.875' ' 8296' -1 4-1/2"HES X NP,D=3.813' 1 1 8316' 4-112 FES XN NP,D=3.725' Mi to 3.80' I 7 -BKR TEI3ACK SLV.D=5250' 4: 8328' -14-1/2"WLEG,13=4.000' 4-N2'TBG,12.6#,L-80 BT-M,-0152 bpf,D=3.958' - 8327' �� 8334' -7'X4-12'BKR ZXPFIOI D=4.430' 8338' H 7'X 4-12"BKR HMC HGR,D=4.430" 7'LNR,26#,L-80 BT-M,D=6,276" H 8606' I-4 1 3L @ 8,950'MD ' j TOC to TOL 3-1/2"X 3-1/4"XO at 8970'MD ' FERFORAT10NSUMMARY \ 3-1/4"X 2-7/8"XO @ 10,760'MD REF LOG: TCP FEW __. ANGLE AT TOP PERE: 81"a 9470 67° — .- Note:Refer to Production DB for historical pert data TOWS 9260' MD.4-1/2"KB packer 2-7/8 L-80 to 12,880 MD TD SIZE SPF NTERVAL Opn/Sqz SHOT : SQZ 9410'-9480'I--I DAMAGED LNR,D=2.5"(@ 9439 elm') 2-1/2" 4 9470-9870 0 03/04/02 I 2-1/2" 4 10030-10630 0 03/04/02 PBTD H 10721' I . . I4-1/2'LNR,12.6#,L-80,.0152 bpf,D=3.958" -n1-0802' 1 X.' DATE REV BY COM/E RITS DATE REV BY COMMENTS PRU]HOE BAY UNIT 10/04/91 INITIAL COMPLETION 1W07/13 JFK/PJC GLV C/O(08/04/05) WELL 02-32B 12/21/99 CTD SIDETRACK(02-32A) 12/13113 JLS/JMD GLV GO(12/11/13) R3RIfr No:' 020230 03/06/02 D-16 RIG SIDETRACK(02-32B) 05/14/14 NWS Proposed CTD sidetrack AR No: 50-029-22209-02 06/11/03 CMOIRP KB ELEVATION CORRECTION SEC 25,T11 N,R14E 23'FSL&740'FWL 04/25/13 CRR/PJC DAMAGED LNC 04/26/13 PJC REFORMAT DIAGRAM BP Exploration(Alaska) r1 I 1 44 I o; 6 oft o lel;- I Q x -. WNW I °I' = I YY 4 III 1 :./ :' I — I Pli 1 1 ae.._ ♦0,4 1 air- , s„_ Lu II 1i(-- . 3 : I f q ;2 I I I 1 1 0 I Q co ro� I O La I a a .• • I 11• U I 1 Q• t 0 1 1 2 C) I 1 Z 1 3 u,. F— "T. 72 • u I 1 J E E ii i 21 I I . I :. 1 `11 U 31 1- - 1I°\ R I . I I \ u u . x 1 U E I _„ I \ I W f 1 • f •n u, x ' \ ii9u I IL n r >'- CO f mN •-. '1' U �, op U I W" 'ii.);' o I i• 51111 ! -:41: r F \ .1 ] 1 Q 2 U 1 L. :v a . 1 o \ jJ , NH E x � U \ 1 U •s. ! a Q o J a Q C) co C) cu Q _ Q (O •MUM N CO 0 MC CDO V 2 0 0 c :U: a � M M � Z a` aoo a CO o k. (D a Z 3 m Z M N V (D O O a0 M .- b, O O vi LD N N M (n - W 0 N c0 () Oa_ O a U 00 Z Q m m c o N N CO M • 0 5U N...N.. a U N a N 7 7 7 Y N V O O co yy (D (D ? N j N V (0 (0 7 Q N N (n u�)\ 0 J a' .. N V E LO a COOI 01 d O 'AIppin J M M 2 c in CI (..1 'y0 7 9 N N H W in d y y D D c a Ol 7 P.y J J U( 07 > 7 O Of .. 01 U N o 712 c '2 L J J CD L d n N Wd O) y 2 c CG c ` C C (n c .. 2is e R a NC U w (i m U d m E0 > > co C M o 0 mumCe K L a (.1 v 6 U GO t .� j. I,, O m O y y N J r6 Z to 0 O OCO- 1,..N O O act CO a O O N cc; CO O_ r d N m CC CO O C co N a 2 � a r m = c 0 o 0 3 = o 0 11 ° W o CO ycoN N 7 y N co ii 0co L OI C m pl 'O a. C A c O N CL L C Z W f%) t N — c m m Z o co 3 .) U) E o dy O 0 ? ' p Z EL } o Q m N m ea 0 _ W O O 2 m g x c a (n O = m 6 .A p y o a m U 7 V N N y L N Z 0 0 0 m W0 y O O O N ° U C O ca r-- Z r O 0 0 0 cc) co0 co N O m aj coM cs, 0 LCQ c<1 NR 2 0 coQ m Z O of M Z mCNm 0 co (a a a O o d NN 0. O N 0 co 2 N O n Q Y Z +.cCON= N CD m N r "O O M co c D Z Q La c Z.a a o o 0 c m .2cu RI E E o c o c y w d co T 6 7 '. m ',---- RI 0 73 yo °; a toN aa. F' ° a t. ? N- :.•• . c p O 2 7, m N Q A d m .g O o7, d p d q y j y y N 0ain 0 a 202 in V) aa 3 3 a 3 2 0 Q > > t O O O 0 N 0 7 In 0 0 0) 0 V 7 N OD 0 CO O 0 0) 0 O 0 CO O O f- N. O) O N V ID 0 a O 0) ca O 0) O C) O O C) O N- f- O O V Vj C) co co N CI N N CDCO W O O OD O O O CO 0 C0 0_ 0 F O Lo co co co O CO co co ‘- co co V CO CO If) 0 CO 0) O N g d (O IA 0) N V O N.. O ON C) CO N 7 '- NN O L7 N O) u) V N 0) C) O O O o O co co O 0) Z co co O .-- N CO O CO OD .- C) V CD N- OD W 0) U _ N N N N N N NCI C) C) C) C) C) CO. C) Q d CO (� 0 N » I i i i I I i I I i i CO N N 0 j y N N CC d N W 3 3 , Y O O l0 N O O co O O O O O O O O O O O O O O O O Z 0 7 7 O 0 0 O O O O 0 0 0 0 0 O 0 CO O 3 Q O N N o o) O O O O O O O O O O O O fit(�) u�o1 0 ' N N N NN N N N N N NCV NV1 V E u O)E 7 m d O m 0) N cocN) 7 C 0 O N N F- 2 W n I,- O O CO C) O N V O O C) 7 n V N N N- V CO C) V O a) N- co O V O CO C) CO O V ✓ C) O O R O N C) O O C) U) CD f3 O 01 N N N rr rrrrrrNC) N O 030 U .� � r r r ,- �- r r N C O C re n f` )- r N- f` r f- N- r r f` f` 2 .c N c0 O O O O O O cO c0 O O O O O O O ,..2 d N 0 3 O O O O CO O O O (0 03 O O O O (D O O W ... a, c 0 w 2 O c ti )O C V u m W Nc C) V a) CD CO N O O C) O V V O V 0) C U G ... CO CO m N W O V C) 0) ,- f� co O CO N O Q ` w R .- 'N O O C) N N O 0) 0) m O O O V O IP) O O) O w W U N YO l0 co V co N- CO O N V Y) OD 7 V N- O N V O U 0) - d' T N C co V V V V V O O O O O O O O N- N. r t` VO r Z .R O . I La (Nn LC) ( 4N) LN U)) INn U)) U)) U)) U)) U) u U)) LLOO I) \r ! N D) CD 0) 0 0 0) C) W C) W O W W W 0) O) 0) J1- i Z Cl) 0 Y -2 0 �. vi In In In In In In In In In In U In In In vi c + + -22 c C l0 d' Nt g O (n LL (D Q Q G +7. O (` C) N O (0 V O V O 0) O N CO V N- 7 O CD U D D C D co 0) O CO 0 O OD .- 0) CO (0 O) N N- N 0) O ct N U 3 O V N RC) C) O OD N C) N N- C) C) Oi CV 7 0) o 2 2 3 2 co C? coco C co co 7 CV N co C7 C) CO N N N N N C a f m = W 1— Q O 0 U Q, O V N n CO 0 N- 7 N Q) O 03 (.077 O V CO co m COr (0 C) O 0) 0) N (0 CO M 0 O C) - O 0) CC) n f- h O V f- N V V o + N C) N O O C) V N- O C) O O C) O �' z N N N N N N C) CO C) CO V V V V Ln CO N CO co D O + 0 Z o 3 3 0 3 O 0) n N V 0) CO N NCO O f- O N O) CO V CO O N O 7 (D CO 0) V CO N O N- O N O N- N. 7 O N O N O C) O C) V O N O O C) O R. co O co O) ON N C) C) V V V N. h.. n N n CO CO c0 CO CO CO O CO CO CO CO CO eo ao (o CO CO m (o ao Co (n (o co co (o eo (o co- f/3 » 2.N C) N V O O V N N N O f- V O O 7 V O N- N- 0 O O W V 0) 0 0 O C7 O 77NCNIN CNN "6 - •- ,- N N O O o O 4 O (O N O V O d l0 m N O N O LO If) N O N N C) C) V O .6 N CO CO C) C) CO CO C) CO ro 0 U a CC N N ) (/1 9-.,. M CO Q r: 0_ . W N N co V au_ o 0 Q y O O N 2 N CC (n Z 7 .. C) 10 3 - O C7) N- LilU) C) O O cD O N O C) COCO y N 0 N N C) O co V V V O O) N N N O V Q ^ f� O O N 7 7 7 7 N N CO CO V ONO O CD O N O O O (D (D (D O N- N- CO CO CO O O O O O CO CO A v 7 o 0 co N 0 CO N N CO (D O C O U V CO N 1� = O rn 0) C (n CC O CO.t •6 D CO C • G o ` CDo Z 0 0 O c•;, d E OO n 00 N O O O O o O O 0 0 0 O 0 0 0 O 0 0 0) n o 0 0 0 6) 0 0 o 0 0 0 0 0 0 0 0 0 C O CO NCO o >, 7 O O O O N OO O O O6 O O O OO O CO a - CO N V a) C) V O f- co 0 O co N O 0) N II) O 7 V NO N N N N N 0) C) C) CO C) CO V V V O LO O O CO G C N O O Of N O gT d 0) m 0 (D- (D- C CD- CD- CD- of O) D7 O)Q ) Q) oc o Q] iiF- LL 3 .o H Y w v m o c al d v E d _ a od cc o oa 33ao . (no iN co • I. 0) l() 0) 0 V N R N 0) co N. N- n 0) V W 7 O) 0) O N U) m M CO M 0) N- 1n N O CO N CO O) N u) C N 0 0 m m u) u) V M a CO N N 0) 0) 0) 0) m m m m m 1. N. N- r N- n m m m m m m m co m m co m m m co co co m m co m m m m m m m m m m m m CO u CO c^ o F V o LC) CO 0) N- n V 7 0) co m 0 N 0 0 0) u) u) 0) V 0 m r m N U) CO 0) d s- O) N 0) a) N m a V CO 0 CO r N 7 u] u) d' u) CO u) m N u) u) 0 U O N: m N u) 1� m 4 0 7 N.: m m n V O u) 0) N4 m 1- m m 6Z O m 0) 0) m N- m u) sr N 0 m m V' N0 N- V N 0) m CO 0 N- N. U V CO CO CO CO CO CO CO CO CO CO N N N N N 0 0 0 0 O) 0) H d' d 3 3 sc. Z M 0 Z coN0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 O 0 Q 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O m m U N N N N N N N N N N N N N N N N N N N N N N N N N u) u) NC.)@) E o G7 27 O m O] LY a LU M M 7 C_ a O • N N F- 2 W `L„ 0 0 03 N 1� 0 0 m CO 0) N V V 0) N- CO 0 0_ N. CO m co _ W N 0) O) V N. N n CO 0 m CO u) N V CO V r CO m N. I- ui CO 0) ca N- r N- r m m L i V N D) m N m O N M n W co u) m m •-- co co 0) N LO CO s- 7 n 0 M m CO V co 0 .- co m 0 iiN N N N CO M CO CO V V V u) u) LO CO CO m CD 1,- N- N- n m co C o C1� n N- n N h N- N- N- N- n N N N- N- N- N- N- n N- N- n h N- 1- t g m m m m m m m m m m co m a) m m m m m m co m co m m m w y) 3 m co m co m m co m co co co co m co co co co m co co co m co m co N 2 R (x w v d C O d C dU R o C U N N. 0) N- N- s- 0 CO u) LO N. s- m N 0 N CO u) 7 0) u) 0 m N W C V V M CO u) u) m 0) sr 0 1- m LO m 0 M 0) m O u) u) 0 O m O) 4w R 1O M m m m m 0 N N O O 4) CO C m u) 6 O V (� 0) Q1 n M (j W d („) W CO O 0 .- N M V u) u) m m u) u) u) sr CO N .- 0 CO m a N O O W :! O' N 0) n CO CO CO CO m m m co co co co co m m co m m CO N- n N- n N.CO U) aN) N LN LN M N M M M N VN) M M N M UN) uN) M (NO M M M uN) uN) V 0 (•4 t N Q7 W q) 0) 01 0) W 0) W W m 0) 0) m O) O) 0) 0) 0) 0) 0) 0) 0) W 0) JS' 2 (A O Z � u) u) u) u) u) (n vi ui O. u) ui 6 u) O. ui vi ui or. Li ui ui Li u) (n u) t I 0 _ 0_ I- m N- CO O) N CO N 0) N- O M V M CO CO V M P m _ N a) O M R M V O O m O 0) 0) m u) W W V N M m O) N m 0) W u) 0) O N 7 m h 1. N .- O 6 m m M m 7 O) N V 4 n W m CO 7 00 N N M m W N (O N- O M m m .-- M m m 00 CI) ) .- .- N N N N M co co CO R R a inin CO 9 W I- 0 0 CL 0 0 0 N N m CO .- CO V M V O N M m N m V 0 CO m CO N- O N CO CO o V' O CO m (O N. CO co N 7 m N M m Q) N m N O m V N- O) 0i N.: 6 m 0 ,- O N- M N- 0) O O) n V 4J N CO 4) 0 ' N N M M M M M M N N 00 N- u) M N O) N n LO u) LO 0 m (O (0 m CO CO CO m m m m CO m N u) u) LO u1 v v v Ol r Z 7• r r r r r r r r r .-- c- r r r r r r r r r ✓ V N CO 0) M u) CO m CO M N 7 m u) sr CO N N_ _ 0 N- N m V ✓ N. C R. m m u) 7 N O CO N m u) CO O O N- R 0) O 0) N M u) n O) M Ln m m O M R u) N m m O O N 7 u) u) u) u) u) u) m m m CO m 1- N- I,- I,- N- N- N- N- CO m CO CO CO U) m CO CO CO m m m CO CO m CO CO CO CO CO CO CO m m CO m CO CO CO m CO- CO CO- CO- CO- CO- CO- m CO- m m CO CO m m m CO m CO- CO- CO- CO- CO- m CO- CO- O 0 2. LII N 0 N N M V V u) u) co co co co m co m m u) o 7 V M M N N N m N CO a O m N m V 0 CO N m O 0 N m 7 O m N Co N m N N OD V m 0) u) 0) 06 06 1` O N CO u) m 0) u) m o m m N- N- N-n m CO CO D) O) O) 0 0 0 r N N N N CO CO CO CO a 4 co co 0 N- V u) N- s- 0 M s- N V N- N N- 7 N e- 0 N V 0 m N N m N N N M M V' u) m N. m 0) N sr m CO O N V m CO O .- Q u) u) m m m CO m m m m m m m N. r N N- N- m m m m m Q) O) m m m m m m co co co co m m co 000000 0000000 m m CO U >CIS V r. 0( CO N C : CO Q o m Um 0 U o M M C G 2 a CO o o a 0 0 0 a) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 m o 0 0 0 O O O O o o o o 0 0 0 0 0 0 O o O O Q 0 0 0 0 o 0 0 0 0 0 0 0 0 06 0 0 0 0 0 0 0 0 0 o ui m >. co m 1 . O 0) N u) CO _ V N- O M (0 W N u) m V N- 0 M CO O) O) > m m m N CO N- 1- CO CO CO 0) O) 0) 0) 0 0 O N N N N N 0) 7 - CD- m CD- a 0) 0) 0) m 0 rn rn m m rn 0) 6 0 0 0 0 o O o 0 0 0 c c .. 5) _ w o.U O c d v w a o) c o p Q r d Y y A N O 0. in33o a 0 111 0 0 N- N CO ,- (O (O (D N. MCD N M 0) N 0 CO 0 0 CO CO 0 0) 0) o cN N- CO CD 0 N V V 0 0) CO 00 m CO 0 O) a O 0) W O O) 0) O) 6 0) 0) 6 a) 0) O) O) W O 0) 0) O) O) O) O a) 0) 03 CO 0) O OD O W CO OD co (O OD m 00 OO OM W 00 OD OD 0 co CO S 0 CO ° O O 0 CO CO O N N N V C-- M V ,- 1- co ,- M CO O N o 0 CO N N O O d CO co N. e- CO CO 0 m O N CO. CO M4 V CO N W CO 00 0 OD N CO 0 U (O 0) V O O O O O .- N4 (O W V N V (0 N- m 6 D) O) V .- O a) o co O N V s- 0 0 N 0) CD 0 V CO (f) N 0) OM 0 Z 03 W 0) 00 CO CO CO N- N- N- (O CO (O N if (f) ) l() N V V M M V 0, CO m N 0 C`7 co o 5 N N et O_ N N `) co 3 7 = Y 0 0 70 N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD CD Z Q 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD O CO cc; N N N N N N N N N N N N N N N N N N N N N N N N 'D 'D C) N �`�` Of r r r r r r r r r r r r r r r r r .- Y v V V Q 7 0 (0 (0 E _1 o U)- M coN3 c 0 O N N H 2 WW co U) CO N N N CO W N a) N 0) N N. V N N. V a) W N. N N M CO N- N. 0) 0 N. M (0 0 N 0) N- 0 CO CO CO CO (O CO ✓ (O N- 0) O U) V 0) N N) N O N (O OD CD n O) M 1- 6 y N N CO 0) N V (0 N- CO O N M V N N U) o CO N- OO O) N M U .0 CO CO OD CO W W 0 01 O 0 0 0 0 0 0 0 0 0 0 0 0 C 0 c 1' N- N- f� O a0 OD !b (O OD m OD !b o OD O ao lO 00 E �' OD O m (O CO CO (O CO o (O CO CO CO CO CO W OD c0 CO CO OD OO CO 0D w N 0) 7 CD CO CO CO CD CO (O (D CO 0 (O CO CO CO (O CO (O (O CD (O CO (0 c0 (O d 2 W a c d O y C d O A 0 d C 7 O N N (O O - (O (O 0 N- N- M V C- M M N N- Co V co N C U U O •V N- O fD CO N. N M O COCO (O N O V N. (0 M CO Na) 4 ` C r O ".3 .11. 41: (7,' .6 CO N N (O (n M O (O O N C") ca C7 V l0 f� O ri a) CO co (O N V N O (O )0 CO 0 N- l0 N O) O N co O N N N m f0 CO C� d K T A 0) 0 CO CO 0 f0 0 N 0 (0 (0 V V V CO M M M M N N N d 0 .0 C N N N N N N N (V N N N N N N N N N N N N N N N N 0 o cc t Z 'Ti t C u) 0 (n (r) N (n (n (n v) v) U) (n u) N (n (n (n u) (n (n v) u) • > W W 47 a) O m O) O) W T O W Q1 W W W W 0) W 0) W W CO CO - ~ 2 Z to COO Z �. v) (n (D 0 u) N U ) U) v) v) vi u) u) an u) (D N vi (n v) (D (D U) U) QN V CO M V 0 N N V co .- LO 0 V N C� V (O CO h 0 ,- N 4) N- M (O 0) O (O N- N co N. V N N o (D OO Of C- CO (O O (O CK V (O N- (O 0) O c0 N .- N C- 1- O M W m N OO O (O 00 1n o N V (D co co N V (O N- tO 0) 0 N N M V N OD 0) a) V V V V V 0 N u) N ID N N CD CO CO CO 0 0 CO CO (O 0 (O (O CO = W 7 0 0 CL 0 N. a) 0 0 CO 0 .- CO N- N- 0) CO N CO CO O 0 CO (D 0 CCI (D CO (D N N V 0) N t0 O 0 V N- Ln O) O M O) O f� .- N co N ✓ V V V M M N- '- M In O N- M on m O V N- O N N (O M N a) N- V N CO N V CO N N N CO CO V .O co W co 0 a) ✓ V V V M M CO CO N N N N O O O CD N Q. N CO 0 M CO CO 00 N Ln N- m CO (D M CO M N N (O V (D N- 0) ✓ OD M N- N 0 N CO CO N- 0 CO 0) N 0 00 N (O CO V N N CO M M V V (C) 6 N o O n N- N- N- OO o o O m T O O co co co co Co co co co co co no co co co co co co co OD co co co 0) a) CO cD o COCOCO coco W COCOCO 0D 00 c0 O c0 CO CO CO CO CO CO c0 CO CO CO- CO- CO- c0 o CO o OJ lO W OD OD OD OD OD Oo OD 0 0 W o OO o 00 O a M M M M M M M M co M M 0-) 01 M M M M M M M M M M CO N CO CO (O N 00 V 0 (O N OD V 0 (D N CO CO N CO 0 V CO V O CD N O N 6 O) M 1` O V (D 0 6 (0 6 N N O CO N O) (D 0) co co co co co co V V (D Ln (O CO co co .- O 0 O (n In 4- (0 Q W 03CO M M M co V V (O N- 00 0 M (O 00 N 0 0 O CO N- n W 0 0 0 . . . . . .- N N N N M M CO M M co M CO V V V CO CO O O) 0) 0) 0) 0 O) O) O) 6 0 O) 0) O) a) O) O) O) 0) 0) Of 0 Q co co co 0) co co co co co co co co co co co 0D co 00 co co co co co co CO U >. O 0 CON E d o r -0 0 M M c N z O _ O o o O o o 0 0 0 0 0 0 O O o 0 0 0 0 0 o O 0 o O o 0 0 0 0 0 0 0 0 o CD o 0 CD 0 0 0 0 0 0 0 0 0 0 0 0 0 >. O O N O O 0 O O O O O O O O (J 6 O O o O O 6 O O (0 d N 0 CD 00 V N- 0 M (D W N 0 m V 1- 0 M CD 0) N U') > M CO M M V V V Ln (0 N (0 CO CD (O N- n N. C� CO c0 CO CO 0) 0) aj 3 Q - 0 0 0 0 0 0 0 0 66666 O 0 0 O O O 0 0 0 0 0 • V 0 C dG d c Q p d o dd R N oav33o a N CO U) a- CO Cr 0 CO U) N m U) N m CD 0 N- CO m M N- cr n 0) CO m CO CO m n n O 0) O W CO CO CO n n n m m U) U) V a M N 0) 0) O) 0) 0) O) O 0) 0) O) m mai m m .- r ` a 3 m m m m m m 0) m 03 00 00 00 00 00 00 0) 0) 0) 0) m CO CO 0) O 0) CO m u o o LO C0 CO U) CO N M Cr Ns- a- N n U) 0 CO CO N CO m CD N- a) 0 d O n CO 7 CO N M U) O) CO n V N O CO CO 0) n O m V co co s 0 U NN m N 0) n V m m m O m m m m n m U) N W N O4 0 z a- N N N N N- a- N N N m U) N 0 m N- U) N 0) CO CO a- V n O M CD m N V' N- O M M HQ xd = 3 = Y 0 0 Q 0 O O O O 0 O O O O 0 0 0 0 0 0 0 0 0 O 0 O O 0 0 m m N N N N N N N N N N N N N N N N N N N N N N N N N LOU) U Na'�` SG G G W lc 7 J O N N N a, - c D O N N H W ,-, 0 CO N U) N- m N N N- C 0) m n CO N 0 U) N_ n CO N m CO U) N N M U) V M m n m ? 0) N N m U) U) CO M O V n N O ai cO V U) cO Oi O 0 C') C` N m N V U) V m 0) 0 C) d an U) CC) CD n n N- .-. n N- CO W 0 N CO U) CD CO CO O N N N M M ON N N N N N N N M CO M M M M M C 0 C m m m m m m m m m co- m m m m m m m m m m m m m m m L — �' m m m m m m m m m m m m m m m m m m m m m m m m m w N N 7 CD CD CD CD CD CD CD CD CO CD CD CD CD CD m CD CD CD CD CD CD CD CD CD CD ct W C d O d ' C a) U R C U y O U) CD W CO N U) CO CD CO U) n N m m m U) 0 M N CO CO CD CO ry C U CO. W Cr m m m CO M r V CO O CO N n 7 M CO V. 0) 9 5 , a) — M M 4 V m C 7 U) m n 0) N U) O ' n O N M Cr V CO U) CO O w a1 0 a) m U) N O) n CD co O n V ,- T CD M CO CO CO 0 n 7 CO U7 U a) 2 R 0) " 0 O O T CO W W D7 m m m N- N- n n COm COm V) U) U•) 7 7 re W a) a C N N N N LO LO LO CO CO • > 0 N d) m O) d) D) D) 01 LO LO LC) LO c0 LO LO LO W O) a) 0) m m W W 0) LO LO LO LO LO LO LO LO LO 1.0 O) 0) 0) 0) 0) CO 0) m 0) 0) JF 2 2 U) G Z a `n LII- vi N Ui L. N LC) Ui LO U) m m ui m m m m N ui v) vi t 0 0_ N- N V 0 0 7m No C CD m n 0) n m m O [t m N m m 0 M 4) V U) n m no U) n CO m N V) LO U) CO V M M m CO C CO CC c0 4 O U) n m m U) W ai .- a W 4 n 0) W n M n O W ON N NN N M M V a U) N- CO W N CO ,Cr U) CD CD n n CD 0) N- N N- n n n N- N- n N- N- N- N- n N- a0 CO CO CO CO CO CO CO CO CO C m - W 7 0 U a n CO 7 CD N- 01 0 .- Co) CO 0 N- .- a CO N- 0 V N M CO N M U) 0) CO CO V a- V U) SO. m n O m CO V m 0) 0) O) r V N CO N M M M • U) m m mm m n n m O N N W CO n 0) '- N N CO M M M N N- V CO U) R N a) CO M 0 CO U) N m n Cr 0) O CO 0 N- V CO CO CO N- N- N- N- CD CD (0 CD N U) U) 7 V V V M M M M N N N CO U) g a zz 7 O O O Cr, M N- U) CO 0 CO R 0 CD 0 N- 0 N- 0 CO 0) •- N- n m V' n 0) N U) m M m 0) R m 0 M CO N CO M 0 m co O N N N N M M M M V V 7 U) U) N m m n m m m O) 0) 0) O) 0) CO 0) CO m 0) W O a) CO W O CO 01 O) 0) O) 01 a) O) a) N CO CO CO m CO CO m m CO CO CO CO CO CO m CO CO m CO m CO CO m m m CO- COCO CO CO cc co- co- 0u m m 0o m m m m m m co- to m m m m 0 .. CO M M M CO M CO CO CO CO CO CO M CO M CO CO M M NNNNN N m N CO Cr 0 CO O V CO N CO 0 7 CO. N m V 0 m N m 7 O m N N m 0) CO n m n CO m m N m ms-: U) Q) N m O) co n O C CO m CD n n n n n CD CD CO m LO U) U) v m U) m CD CO CD n n CO CO r r r a- r r r a- .- r r r r r r Q 0_ CO VaI N M V m CO m N- n m O) 0 a- N ,Cr M CO M CO ' U) CD m 0 M V V V 7 V K 7 Cr Cr V Cr U) U) U) U) V CO N N- O m CO n n m Q O) W O) O) 0) O) 0) O Oi O O) 0) O) a) W O) W O) O) O m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m co U >.. V a) m C N ✓ L M cN•) C z ? 0 a COd o 0 0_ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 o O 0 0 0 0 0 O o �) 0 0 0 0 o Lei 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o CO d m n 0 M CD O N N m R N- O M m m N U) CO ' n a) O O ON N N CO CO M V V V 7 U) U) U) CO m m Q) O _ _ _ _ _ a) u `o C ate) -q- 0. y . a rn c ,-- E •— y .N ci a 'm 3 3 o a N 3 • C) N N M O M V V V U) U) CO IN O O 0 U) IN CO co C) C CO • O 0) CO O 0) 00 N- CO U) V M N O CO O UV V 00 IN. N4 ( ) -Q 0 0 O 0) C) 0) 0) 0) 0) 0) W 0) W O O C) O) 0) 0) 0) 0) 0) j O) CO 0) CO 0) CO 00 CO 03 CO CO CO au CO CO W CO CO 00 CO 03 OD aD CO CO a) 100 ., o 0 o h M 00 U) 0) V a) U) a0 (� CO U) CO N. U) N- U) M M V C) N- O n- CD g Q. N- O O M N CO V V O 0) ,-N O U) MOD N O 0) CO (D CO C) U (O O a0 V N- n O) N (O CO U) M O on (O C) a0 C) N- O V O MMO0 CV 47 IN CD j 0 CO VN- N uP U Z CO co V V V V V ( LO N C) (D (D CCN- h COOO CO CO Q U e M m 0 ( w N CVCO CO 0 >- N N CC • f = = 3 Y O O 0 C O O O O O O O O O O O O O O O O O O O O O O O O (D C) Z Q O O O O O O O O O O O O O O 0 O O O O O O O O O Co C) 3 N N N N N N N N N N N N N N N N N N N N N N N N CV aaO\ DomU M V© E LO r r '- .- r r '- r- r- '- N 3 0 co 7 O m m O) 1)) ON') (N) 7 C a p O N N F- 2 W ,._, U) co U) 0 0 0) V (D N. C) CO U) N 0) 4- U) N_ N- CO N 0) N- IN N CO U) V O M n CO V V M O C) O U) M O V n N 0O N N.: CO IN U) 0 V a) 6 U) on I- m n V 6 N on Ci O on a) N N O O 0) 0) 0 0 N M M V U) N C) C) (D (O LD U .i 0) M M CO CO M M M N N CO CO CO M M M M M M M M M M M M O O C COCO a0 a0 co- a0 co- W W cc)- 00 co- co- co- aD co- co- co- co- co- co- aD a0 CO O)▪ L , IK CO CO aO a0 aD a0 a0 a0 a0 W O aO aD aD co aD aD m a0 a0 aD aD a0 a0 2 N0 7 (D O (O (D C) C) C) co C) co co C) (D CO a) C) C) C) C) C) C) C) (O C) Q. W O C uiO C N V 03 '6 C v ` ' 0) - n IN U) IN N 0) 0 W LO N N IN CO 4- V 0) CO N V U) M 9 y C 15 U N O N U)LO 4- C) 0) O) O O CO C) 0) V O N CO V CO O N V O 2 0) U N N 0) ((00 LO 01 o IN V on CCO U) N N IN (NO V ri V a00 (UO N N (OD M O ✓ OlUD U)U)U)p) V COCOM M M N N N O O O O O 0) W C) CO CO CO CO °� t m a 5 < < 0 0 0 0 0 0 0 • p t+ (� ;C N N U] U] U) U) U) N U) N U) (n U) U) U') UI U1 Ul U7 U7 U) U) U) N U) p 2 Z 2 p = LO U)Cf) CO W 0) 0) 0 D1 O 0) CD W 0) 0) 0)3 0) C 0 W D) O 0) 0) W 0) 2 N U) U) U) CO N U) U) U) U) U) U) N U) N U) U) U) 0 Q co N- N CO C) Cr) I. V CO 0 V CO CO U] M O O N U) N. CD O C) CO CO CO N N. CO U) U) CO O) N C.C. I- 0) CO OO V O CO CO V N Co O C) CO C) V NC) N- n U) .- co a0 CI a0 N CJ O U1 LD V V CO CO co M co V V U] a) C) N- au aD a0 00 00 a0 aD 0) CO CO 00 CO CO 0) 00 CO CO 00 00 CO 00 CO CO C0 aO OO aO 07 CO O a0 aD C W 7 H 0 0 Cl IN r- N 0) 0) C) 0 N (.0 N V 4- O U) 0 0) N 0) CO C) N V CO m U) O CO r W U) W O W W N- M U) N CO C) V O V CO M CO CO CO V V U) u) Co O f` N N N N O O CO N- (O an (O C) C) O U) N. a0 U) N 01 CO CO Nil N a0 V N. r rn N Ul CO V IN 0 N N N N N CO CO C() a 47 @ N ea Z 7 0 N- h V C) M co co N- CO N V C) U) C) 0 CO U) U) V • CO C) CD V CO O) N. U) N O � V C) O N� V O � CO O U) CO O O N M V V U) an N- m on O) a) O O N N M M V V O O O O 0 O O O O O 0 0 O O O N _, 0) 01 COO rn m CD CD 0) 0) 03 01 0) 0) 0) 0) rn rn rn m m rn CO a co- m aD oo ao 0o m m aD ao ao ao ao ao aD aD ao co- cc; ao ao co- co - 0 N M M CO N N N N N N N N N N N N N N N N N N N CO V O N CO N C) O V CO N C) O V N (D N CO V O C) N CO N CD U) CO CO O C) M6 U) N CD O N C) 0) N N00 COO O V 00 0) aD▪ m 0) 0) O) D) co CO N-. 4- N. C) C) CO C) C) C) C) N- 0) "' 0_ CO 0) a) O U) co co V N N- O CO C) 4- C) M M V U) (D WV N.- O U) U) V V V V V V N U) U) C) C) IN f` N- N- n IN CO CO CO O) Q CO CO CO CO N- CO CO CO co CO m on on on on on m ao on Co m on on on on woo coop aD aD ao aD aD aD aD aD oD aD co a0 aD aD aD aD aD aD aD co m U N V CO C N O C -00 M M C f0 Z▪ 0 CL o o 0 O O O O O O O O O O O O O O 0 O O O 0 O O O O O Z O O O O O O O O O O O O O O O 0000 00000 Q a O O O O O O O O O O O O O O O 0 O O O O O O O O (0 a) O M C) IN 0) N U) CO V N- 0 M C) N- 0) N U) CO V N. 0 N lL N N- N- N. N- 00 OD_ a0 O) W W O O O O O N N N M M 01 "� 4- 4- N N N N N N N N N 0. U) NC its 2 ' r 4 _ o. a E c v m . 0 0 2 To ) d mCV t.) ain330 a 0 CO V N. 0 V N. U) CO CO 0 N- N 0- ,- CD CD a 0 0 0) CO m N. C.- m N m V M co O m 0) CO CO N� N- m CD a O m 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) O m m 0) 0) 0) 0) 0) 0) '-- 0) ao CO CO m CO UD CO CO CO CO CO 0) CO CO CO CO CO CO CO CO CO N c1 O R o 0 H O LO CO CO • N )f) 0 N N. V N CO 0) CO CD V 0) V m m N d m O V O m '- V N N M 0) CO N- N V e' '- Ln 0 m CO 0 U Ni n N N- V e- 0) m N m co m N4 N 0) m .- m CD CO 0 CO N CO CO CD 0) N V Ln co V N- 0) N )f) N 0 Z CD CO 0) 0) 0) 0) O 0 0 ON N N N CO M CO Y., Li m0 NA N CO M 0 j "2. N N ix 0) 0 N a co N N 3 3 = Y a C) la N 0 0 0 0 0 0 0 0 0 0 0 O0 0 0 0 0 0 0 0 0 Z Q O 0 0 0 0 0 0 0 0 0 0 O 0 0 0 O O O O O 0 m m N N N N N N N N N N N N N N N N N N N N Ni LO 1.11 U G© E ina O mm a) .- 2 Qo M co ` 0 V N N H W O n N m CO N- CO N N- 0_ V CO N V '- CO N CO m CO N m M m V CO 0) 0) m V N- N 0) m O V 0) N CO co M N M N O m V V m O N V m m 0) m V m N 0) In U) )1') N CD CD n CO 0) N CO V N CD N- N- CO CO U CO CO CO CO M CO M CO CO CO V V V V V V V V V V V C OC m m co- m m co- co- co- m co- co- m m co- m m m co- m m co- co • L - a-' m m m m m m m m m m m m co co co co co co co co co y) 2 CD CD CD CD CD CD CD CO CD CD CD CD CD CD CD (0 CD CD CD CD CD a) CO y W O C O R N 1c u b c R _ 'O C y V y g V O V CD m CO N N- m CO N. CO 0 0 CD V 0) N CO C N n 1*--- CO N m O 0.: M N N V co In m M m CO m P d w CO m m m m m N N- 0) O M m M6 M N N. co W m m W O w y d (.1 W O r- V co N N 0) f` V o a) co M O N� V m N In Nn V V' U y = d a CO n N- N. m m CO m m N V V M M COM N o 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CO1 0t Z 2 L N u) In )l) )n N U) In u) u) )n )n N In U) N )n ll) N N N )1) J > p 2 N O = in 0) 0) ) 0) m cm co rn a) m 0 m 0) 0) m 0) 0) 0) 0) 0) 0) F 2 Z 0 ui vi vi m vi Ln- u) in Ln- u) m ui ui 0 Q o CO V CO 0 LO CD ,- n 0 CD CO 0) N m V 0) 0 N N CO 4) N V )n )n V n N V Nn N N N O O M N- V O N CC O CO Ni: Ni: (O O In C') N M co M O M V M O m O N N CO n CO CO 0) 0 N M V in CD r CO m 0) 0) 0) N?) CO m CO CO CD CO m CD CO CO 0) 0) 0) 0) 0) 0) CO 0) 0) 0) 0) CL m I— 0 0 CL N O M N In ,- N. N V M N- CO 0) CO N V 0) CO ,- W V CO N- N V V CO ,- N CO x- O 1- V co co n N N n t)) V V m n n N N N m V M N O n O M O m n m )n Nn m N O co m 0) N N m VN: 0 N V U) CO 0 CO m m N U) CO v v v 9 u) v) m m 9 n n N� N N� m aD m oD 9 9 9 m W C a 2 ° M co 1f) CD 0) N M N 0) V CO CO N- 0 CO V) U) CO • N CO V 0) V O In O V n CO M CO. N f- U) 0) 0 In N m m N- n m 0) 0) O O O O N Ni M M M V N N N N N N N N N N N N 0) m m 01 0) 0) 0) m CO m CD 0) CD 0) 0) CO 0) 0) W O) m CO- 0 CO- CO- CO- CO CO- CO- CO CO- CO m ro 0 ao ro ao 0 m m ao G N N N N N N N N N N N N N N N N N N N N N O V m N m OCDNCD O N O m N m V O m N V 0) CO CO V n M O co M C') co O C') N- V m 0) co co co N. N- N- m CO CD in U) U) in U) CD m m N. n N. N. Q a co 1 O O T- N V CD CO .- )n m N V V )n Cn CO CO 0) V )n 0) 0) m 0) 0 0) 0) 0 0 0 a- a- a- a- a- a- a- ' N N N Q m CO CO CO CO CO CO 0) 0) 0) 0) 0) 0) 0) a) 0) 0) 0) 0) 0) 0) m m m m m m m m m m m m m m m m m l+D m m m co U T (7 N CU CO C L 0 CN') CN') C • 0 o m N N O O Z W d O O d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Z 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O O O 0 O O O O O N T N m N M (0 0) N N CO V N- 0 CO V CD 0) N 10 m V n m Z• CO CO M V V V )n In In m m m m CO N. N. N. co co co m CD 0) N N N N N N N N N N N N N N N N N N N N N CO C N N ? r r r r La .- — — p .- a o c a) v m a o) c o E 2 r a) W a) Co N U 1 co 3 3 0 d ^ co a ..S- ea m O O co O) I Co a a I 0 U • O Z U __ Q 0id id N N co co 0 N N ae a N (/ 3 3 N Fli D 2 m (D (O = Q ID- N (n u) U . a3 m ©U E u) 0 N = a' 0 oom cu E O) NNco c co0 0I N N F— 2 w N () 'o C o r 0) ce d 2 O O N C N LLC) o O OD V d c▪ ai u is O E ,_c 'O V U d = 2 c o °1w i, ❑ U w U aI. v To iZ a T co m a LO CD LI)m O ❑> ❑ O C 1, , - CO O CO J F r2 2 CO O'❑ ai I� N E C m E m ,� .- 0 U O ❑. a) Q' a Ca m ❑ p 0 o 0 0 a m I C O CO a rn �'. E O) N a) > a)m I E a u a m 0 a_ Q V I- OY w V w co n co 0) O s- N M t N ❑ a. d Q E N- (NO o Cr N- C) CO COH (O Cr N- N N CO CO CO Z O V I` O n I` 00 00 0) N (o N M oM co CN (O O V0 (D CND- N ON-) (0 D O O W' • w 3 w + — u m Lu c z w J Z Z O J 0 0 V N- N. O CD 0) C1 co 0) 0 m LO CD M V 1- �p ,- O M IN 10 a- O O N 10 O CO CO V V Z U 0 O - O N N4 7 ca N- on (O 0) (O O N 0 VI N LO N. CO CD N- N N 0 V0) N- N V (D 'CO J Q N N CO 10 Cr Cr 0) I� Cr V n Cr) (- J O Z y a- a- co a'E + — ❑ a M C) CO 0- C CD (O CO . a vi a o 10 N CO CO IN cr N NCD Co O V V V OD E p,y 0 (h O) cr co I� 0O OD ICrV CD coC)- 10 `Cr N. O (0 N (0 CC (D t' 0f C (") OD 00 N .0 4 (0 N O 0) OD O7 4 0 CO CO (D N. CD CO CD> CI — UV 10 N- ) C0 CD N- CD g a V co w aD OO CD O) 0) 0) 0) 0)O COM COM V V CrC O) CD0N.) 0) rn rn 0) Q y 0 2. m co- m m co- op- 0o ao 0o c6 co" m o co- co- m a > m o O o U N a (D .- O _ O M O m N d % (O 0) CO N O O O O O O O O C) O O O O O O a, O E O a 5 V V O a N- O O O O O O O O O O O O O O O < O Q) U O y d 7 (+� od N d a O OJ O CJ (fi (D (!i O N O O O Ci In CJ L L N N R ❑ - a) CO CD CO u) N. O) CD CO IN N. N. N V CO = D ❑ CO CO C d a, a mNN N N co CD N CO IN CO CO n O CO CD OD Z• a a O O a N ❑ ��.. W D7 W Q7 O O O O O N N N N E C co u O >, C R CO CO T O O a C y d C Cl) C Y G u O c cn Q c.) e1' • a, .. a en _ a) C O c.)• av) 33 ❑ co 0 —o _ r) CO CO c, L N N N v m o _u- ,i M CO Oa . 0, N -L.N..i N co H m LL l _ N - W rn LL N r 0 00 _ _ Zas)ON m U N - 7 0 7 .:+ a I- 0 r)cZj N N M C_ Z 7 0 p 0 a5 m N O O N O O —N O ~ 0 M O _ - j CO N//0��Zp//U))��U M o - p 0n _ NlJ0 LIQ 0 U) Tv- 2 IT - O _=aliN N E —N + 9 ueld/Z£-M —v W >>NM_OM.0 m _ + N CI Z >N(nN� LL U- - o, o - inc.:. - CU W 6 .666-6 N ti a - W -- 0 (-) U U U U O C C C C L —O - —O Z 222215 0 o M - U) W w��w2 , N N w - wa) 0a) a) C O 0 _ - W [Y O_O_W o = o o N • W00 .-. M---.c •-,=. 1i rn —0 Z NU ~ - V C] M - U (6 C.-0 U O _ O M - Ln - co 0> a) ] i I I I I I I I I I I I I I I I I I I I I I I I I 1 1 1 1 - 0 U 2 O 0 O 0 0 0 0 u) N 0 N u) r n u) - O N —O co (ui/}}sn 0096) (+)4l-1oN/(-)U1noS _ - o- c —O - u) CI - 7 - 0 N U 0000aM V 0 N N- U)M - O) 001M N- , O co N a) (00 V 0U) U) 1- Oa)000C).- Ma00 - o V (n (V U)N 0 0 M V V N 0 0 V V 0 IT -0 0 _� > x)O N 000) N- 0(0000 V O) V LCL 0 - N O - N N N M 0 0 L M .- M L m= m m O M ` o Lc) (A N i I J 0 _ _ Q 0 WZ' 00000000000000000 —o �p W 000000000000N- 0000 - C 0 „7 N LL0 0 0 O O O O O O O O O O O O 0 W OLAP I- MMM0000000cp06)06)0 - m O J0 —0 N N 0)0a) 00000000000000 N - m c 0 0,- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U J V 00 N 0 0 0 N N N N N N N N N N N f wN - 0 NN - j —0 a)Z > N- NCO V I� Mf�O V N- NCODOOM N "0 CO(O0"- V 0MC0(O - U)- NOONN 2 - 4-00 00' N " 01- - 00 ' 1000N N M p (0 W N (OQL0 N- NOU(000MO - N (OJN- + (C-)CC)C) C)7 � V (O(ON NCO a0 a000 - 0 N C-) J No 0 O Q - f ,—CDMI- UM(OONLUa0(ON V V - M J O� 0 z6, - N V 0M1� 0U) 0U) 0U) CON .• Q > + NLU1-Ma N- NNLU V aRr N- N VM - o —ro�� ��� �� 01- � 7Vf�0?0C) 0)N- Z � - ou) U(C) Wo7CO 0 C (NC0 -1f)(15 _N (C) CO N- 0NN V OM(OMO V V V SCO _ '- (NNaJ �WW > VMr.- 000 - U � I� OUNUM0 , _ 0 W � / O "-) O"- I- O ` 0 0 F — ` C ( UON (13 000 W 06) 0)6) 0)Opo)° 0 a 0 __ � a) p aO 00 M CO M 00 O COMaO a0 CO M O c000 - 0 - o > cn (L N Cl TD 'N V (O N LO M('MM M(MM M N N N N 1o - 0 QU)000NNCOMCOWNNNNN V —N MO N0 V 00N ,- CON(000 - 0 CN U)U) U) U)(O M M N- U)r R 0(00 U)1— - L O co M co co - t N - Z� 0 - 0, 00VNM(0000 V MMO V U) 0 0 C 0,- VNT- T- MV V1.OV1�0,- N _.... —v 0 r 0 , (000000000000000 - A (O(O(O 00 00 CO CO00 N a0 CO CO a0 CO CO CO ID0 N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 —0 N- 000000000000000 MCO aO U)1� 0C0 = 0 � f- N- N- N V O W O N N N M C O N M I- a O .- M I- O M (O N I I I I I I I I I I I I I I I I 1 1 1 + 000000000 � v-� NNNN 0 0 0 0 0 0 CO 0 N CO O) 0 v�O (ul sn 00i7) 4�daa �eoll�an anal Z p 0 _N M� U) (O N. 0CO 0 0 -N co 0' U) M CO m S "S g `>- '> i r i 4 3„,,3 'S 3 25 232 _ kt 5 3 1 S 3%%> S '0 O O ao m m N n LO M m n m m n Q C 8 <8 f p 8 8 8 Al A TpS R 8 8 A 3 V A 3 A B ,m 8 8 P 8 8 $ commvou,4)F—C m6m.-0 O 0 xX8$ 'gg; 8..ggg8 . .8 .8 - .8$3E60. 8 .T.-8 S�&[Eg� >MNNoMt7Oym Oi OI 0 W 00 O N N m n O(O N 03.1-MS�Lf=m "88888;;8;471;71888888828888888888888826'888g8 �`�8 8 8 8';;n om�l;�!8 A 8 811g 8 8 8 8i 8 8 8 n n n n n N N N M T c7 M m=m `�c g$`�`�&g g g g`�g g g g g g 8 0 0 o g 0 0 o g o&&:e&g o o g o m0000000000 00000 6 $$$$�,,;,;$$$$i$48F3$4gA $4$$$ $ $$g$$$$g$g$1' �00000m00008N0000 +Z 8888888888888888888888888888888888888888888w Fommmmm�m8immrnrnrnmm y q"w f f�f i3fff I ifff[ ff I ffff❑ I [1344 � f414 00.00000000000000 > ❑[]+O I dO_00000000000000 oU� Q o N Oi N N[\j(V OV N N N 6 6 0i OV N N F M 2 2 } 0 n N(O 7 n m n 0 e n N m n O M > > > 999 S 3 > J 3m<0000, 100(O�ip'•NCDNN 3 r 164 c7000cn rc°Dvmu("immmm Q ' 344 �3 ' - � 3'Y W (•�mmM,-yv m(onnm0m00 M S 4 Q S e '>S _ 4 m >3 3 3 0 0 m Z SSBIIrk° `IR.-". x ?-.?,1 8S7m',t"" o”' 3""2!! O ¢ > Lll gg��888g88 o`�`�8i8`d g°d 888Qg o 0`�8 ' & emsg&g o 8"�8gr i 8&8<Mp �,7onnnoo0Mm0T,0nmM4 N 0N1fORR.;ARR.4WeSSS43888nem5AAA8888.,gAA.R R rZmiOf-,:Na0Mn-0,6mNO O OW 8 8888 ggg8gg8 gg 8g8808ggggg o8o ggggU +NOnm0nNN �nN . >- O v NNNML0CO4-ON10.-70 , LLO HNNNNNKesrtofvae41,6,uw 4eenn - 8N HHnmmmaiA�g `n > q mm JBBBBES4I21 BBBBBBBBBBBBB000008g88888 ❑V V mn Osgoiq V rOMN ^d O A N ('7 f I f t I I I f ii 1 ff 1 1 ❑f Alf f I o f la t.`Q0 EIJ >,I MNOO,cvm co caa0.-aoN .M(C,, C O III I @.126';..28 AIV880�0>T CC N N mONWapm.m........ hO Mou_00 >3—mm> o V(ON�OOMMMmmmmNNNN �_ �>m 0 O 010,0)NNm000NN NNNO >3 N C C p N�a 0>ON�a0 (00007 O ] ..M [0 (tl i i S S 94 > 99 3 3 m�nnommnnnWMOTNn N Cn�NCLCL mMmm 27-VnovNmcoo m 'R, o 1-cop.noo SQQq s �s � 8s r4s m a! s8o 83asoS's _ iO .ON .m0?N nT N mmmmmmmmmmmmmomm Lccom 000m gam ug8 g88g8g8gg888g8 omg88„ B��og88g8i8 2cclig2 -'444 i Pl 'S s914 - `- 1sIamigsAgRosse' N O p,p)N 4 g g g g 4 4 4 4 4 4 4 N 6 4 9 4 4 N 4 4 4 4 4 4 4 4 4 N N N 4 0N000000000000000 O 8 . . . .888888888808888880888844 BBBBBBoo8888888 M n O O O O O O O O O O O O O O O <<a _ f f 0000ui cri uio ui0000crio "4 baby$vvvvv3$aa$$$$$�vcvv"vvvvcvv�"vv$$$$� M ao cn 0 co,z 0=n n n N v 0o O O N O 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 0 8 8 8 8 8 0 8 8 8 8 8 8 NONMtONmn0.-MnOmNN E°O n O 1 /`I/� /yfI'�'I1y" �O,T0,a70,000O0 ANN NNN O n N VI O TM� 1� � � 1 I 41 � f o ii+ f �N m a u,(o n 0)O>O�N M O(O(O LL N N 07 O r A � 4^i + <0 dj U) L-8.S1D1 0_ N n 0 0 M m C CD N 0 M'— 0CJi 0 Cn N NO CCT) co N op N J M go�a p Ora .. m N ILI CI OM w Oro NN o z N p y 0 Z~per W E-ow codam p m m o l O J tp -ai E :.aiJ CZ W ] r °m 2 c pl ",, F- El co 2 T ti li U mN 0 ��� �% O O CD L 0 N N c "O COM al U N 414111111 O 05 c1111110010.. Z o CDU o . N L 7 (U D 0-I—. 1111111 Q O Z O O o 03 O N North America - ALASKA - BP Prudhoe Bay PB DS 02 02-32 500292220900 02-32C Plan 6 Travelling Cylinder Report 01 August, 2014 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B.@ 56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Reference Plan 6 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Interpolation Method: MD Interval 100.00usft Error Model: ISCWSA Depth Range: 9,231.72 to 12,880.00usft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,485.40 usft Error Surface: Elliptical Conic Survey Tool Program Date 7/1/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 187.60 6,564.60 1 :MWD-Standard(02-32) MWD MWD-Standard 6,621.00 9,231.72 2-32B IFR(02-32B) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 9,231.72 9,460.00 Plan 6(02-32C) INC+TREND Inclinometer+known azi trend 9,460.00 12,880.00 Plan 6(02-32C) MWD MWD-Standard Casing Points j Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 3,455.60 3,455.43 13 3/8" 13.375 17.500 8,493.10 8,324.60 DRILLING LINER 1 7.000 8.500 12,880.00 8,980.68 PRODUCTION LINER 1 2.875 4.125 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB DS 02 02-01-02-01-02-01 10,525.98 9,300.00 135.13 401.15 -265.51 FAIL-Major Risk 02-01A-02-01A-02-01A 10,912.54 9,300.00 452.84 288.33 188.06 Pass-Major Risk 02-01A-02-01 B-02-01 B 10,840.54 9,400.00 469.44 297.91 184.01 Pass-Major Risk 02-01A-02-01C-02-01C 11,605.67 9,100.00 230.49 317.83 -22.57 FAIL-Major Risk 02-01 A-02-01 C-Copy of 02-01 C Plan 2 11,654.99 9,100.00 277.30 309.84 22.37 Pass-Major Risk 02-02-02-02-02-02 Out of range 02-02-02-02A-02-02A Out of range 02-02-02-02APB1-02-02APB1 Out of range 02-03-02-03-02-03 Out of range 02-03-02-03A-02-03A Out of range 02-03-02-03B-02-03B Out of range 02-08-02-08-02-08 9,350.00 9,900.00 1,328.60 544.99 782.44 Pass-Major Risk 02-08-02-08A-02-08A 9,375.00 10,000.00 1,284.33 532.39 752.52 Pass-Major Risk 02-08-02-08APB1-02-08APB1 9,325.00 9,808.00 1,307.26 515.45 795.18 Pass-Major Risk 02-08-02-08B-02-08B 9,425.00 10,300.00 829.63 486.64 344.59 Pass-Major Risk 02-09-02-09-02-09 Out of range 02-09-02-09A-02-09A Out of range 02-09-02-09APB1-02-09APB1 Out of range 02-09-02-09APB2-02-09APB2 Out of range 02-09-02-09B-02-096 Out of range 02-09-02-09BPB1-02-09BPB1 Out of range 02-09-02-09C-02-09C Out of range 02-09-02-09D-02-09D 10,250.00 12,400.00 678.43 307.46 370.98 Pass-Major Risk 02-10-02-10-02-10 12,616.50 9,000.00 776.75 309.92 466.84 Pass-Major Risk CC-Min centre to center distance or covergent point;SF-min separation factor,ES-min ellipse separation 8/1/2014 11 23:13AM Page 2 COMPASS 5000.1 Build 61 • BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-328:@ 56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-328:@ 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB DS 02 02-10-02-10A-02-10A 11,499.74 10,375.00 193.54 332.69 -139.07 FAIL-Major Risk 02-10-02-10APB1-02-10APB1 11,940.17 9,886.00 451.73 336.51 115.43 Pass-Major Risk 02-10-02-10B-02-10B 12,510.78 8,900.00 794.73 342.54 456.11 Pass-Major Risk 02-11-02-11-02-11 Out of range 02-11-02-11A-02-11A Out of range 02-12-02-12-02-12 Out of range 02-12-02-12A-02-12A Out of range 02-12-02-12APB1-02-12APB1 Out of range 02-12-02-12B-02-12B Out of range 02-12-02-12C-02-12C Out of range 02-12-02-12D-02-12D Out of range 02-13-02-13-02-13 Out of range 02-13-02-13A-02-13A Out of range 02-13-02-13B-02-13B 12,785.36 11,000.00 389.19 334.33 62.62 Pass-Major Risk 02-13-02-13C-02-13C Out of range 02-14-02-14-02-14 Out of range 02-14-02-14A-02-14A Out of range 02-14-02-14B-02-14B Plan 6 Out of range 02-15-02-15-02-15 Out of range 02-15-02-15A-02-15A Out of range 02-15-02-15APB1-02-15APB1 Out of range 02-15-02-15B-02-15B Out of range 02-16-02-16-02-16 Out of range 02-16-02-16A-02-16A Out of range 02-16-02-16B-02-16B Out of range 02-16-02-16C-02-16C Out of range 02-16-02-16CPB1-02-16CPB1 Out of range 02-17-02-17-02-17 Out of range 02-17-02-17A-02-17A Out of range 02-17-02-17B-02-17B Out of range 02-18-02-18-02-18 Out of range 02-18-02-18A-02-18A Out of range 02-18-02-18APB1-02-18APB1 Out of range 02-18-02-18APB2-02-18APB2 Out of range 02-18-02-18APB3-02-18APB3 Out of range 02-18-02-18B-02-18B Out of range 02-18-02-18BPB1-02-18BPB1 Out of range 02-18-02-18C-02-18C Out of range 02-18-02-18CPB1-02-18CPB1 Out of range 02-27-02-27A-02-27A Out of range 02-28-02-28A-02-28A Out of range 02-28-02-28APB1-02-28APB1 Out of range 02-29-02-29-02-29 Out of range 02-29A-02-29A-02-29A Out of range 02-29A-02-29B-02-29B Out of range 02-29A-02-29C-02-29C Out of range 02-29A-02-29CPB1-02-29CPB1 Out of range 02-30-02-30-02-30 Out of range 02-30-02-30A-02-30A Out of range 02-30-02-30B-02-30B Out of range 02-30-02-30BPB1-02-30BPB1 Out of range 02-31-02-31-02-31 12,200.00 8,600.00 1,469.89 341.41 1,163.02 Pass-Major Risk 02-31-02-31 A-02-31A 11,375.00 11,220.00 237.44 345.54 -102.67 FAIL-Major Risk CC-Min centre to center distance or covergent point.SF-min separation factor,ES-min ellipse separation 8/1/2014 11:23:13AM Page 3 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay ND Reference: 2-32B:@ 56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-32B:)56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset ND Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB DS 02 02-31-02-31APB1-02-31APB1 12,200.00 8,600.00 1,469.89 341.24 1,163.19 Pass-Major Risk 02-32-02-32-02-32 9,913.44 9,600.00 49.27 68.63 -18.17 FAIL-Major Risk 02-32-02-32A-02-32A 9,511.03 9,600.00 84.42 290.76 -182.32 FAIL-Major Risk 02-32-02-32APB1-02-32APB1 9,508.97 9,453.00 267.05 299.67 -8.20 FAIL-Major Risk 02-32-02-32APB2-02-32APB2 9,610.30 9,700.00 38.82 227.46 -141.40 FAIL-Major Risk 02-32-02-32APB3-02-32APB3 9,571.14 9,700.00 43.03 255.69 -175.52 FAIL-Major Risk 02-32-02-32B-02-32B 9,475.00 9,500.00 59.52 220.92 -151.45 FAIL-Major Risk 02-33-02-33-02-33 11,900.00 8,600.00 1,317.92 374.55 974.54 Pass-Major Risk 02-33-02-33A-02-33A 10,775.00 10,872.00 367.46 422.68 -42.47 FAIL-Major Risk 02-33-02-33B-02-33B Out of range 02-35-02-35-02-35 Out of range 02-35-02-35A-02-35A Out of range 02-35-02-35B-02-35B Out of range 02-36-02-36-02-36 Out of range 02-36-02-36A-02-36A Out of range 02-36-02-36APB1-02-36APB1 Out of range 02-36-02-36PB1-02-36PB1 Out of range 02-37-02-37-02-37 Out of range 02-37-02-37L1-02-37L1 Out of range 02-38-02-38-02-38 Out of range 02-38-02-38A-02-38A Out of range 02-38-02-38APB1-02-38APB1 Out of range 02-38-02-38APB2-02-38APB2 Out of range 02-38-02-38L1-02-38L1 Out of range 02-39-02-39-02-39 Out of range 02-39-02-39A-02-39A Out of range 02-39-02-39APB1-02-39APB1 Out of range 02-39-02-39APB2-02-39APB2 Out of range 02-40-02-40-02-40 Out of range 02-40-02-40PB1-02-40PB1 Out of range Offset Design PB DS 02- 02-01-02-01-02-01 Offset Site Error: 0.00 usft Survey Program: 100-CS-MAG-MS Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NiS +EI-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) lust!) (usft) P) lusft) (usft) (in) (usft) (usft) (usft) 10,478.63 8,941.41 9,428.00 9,066.38 81.87 55.89 -79.82 1,275.66 439.35 3.500 164.27 386.71 -126.09 FAIL-Major Risk 10,488.29 8,941.55 9,400.00 9,039.88 81.87 55.63 -87.10 1,266.63 439.85 3.500 150.16 389.87 -174.72 FAIL-Major Risk 10,525.98 8,942.09 9,300.00 8,945.44 81.87 54.88 -121.57 1,233.81 442.14 3.500 135.13 401.15 -265.51 FAIL-Major Risk,CC,ES,SF 10,568.75 8,942.69 9,200.00 8,851.36 81.87 53.74 -148.48 1,200.08 445.21 3.500 177.71 411.72 -167.79 FAIL-Major Risk 10,616.39 8,943.33 9,100.00 8,757.63 81.87 52.80 -159.91 1,165.43 449.06 3.500 248.82 420.48 -28.41 FAIL-Major Risk 10,668.19 8,943.99 9,000.00 8,664.28 81.88 51.85 -163.37 1,129.88 453.67 3.500 329,62 426.21 100.18 Pass-Major Risk 10,718.85 8,944.58 8,900.00 8,571.32 81.90 50.91 -164.54 1,093.43 459.07 3.500 413.84 427.30 219.48 Pass-Major Risk 10,746.18 8,944.89 8,800.00 8,478.68 81.90 49.90 -171.96 1,056.25 465.10 3.500 500.77 422.39 333.61 Pass-Major Risk 10,775.00 8,945.21 8,700.00 8,386.26 81.90 48.88 -178.14 1,018.61 471.58 3.500 589.86 416.17 441.31 Pass-Major Risk 10,800.00 8,945.49 8,600.00 8,294.07 81.90 47.86 177.01 980.50 478.50 3.500 680.21 409.42 544.55 Pass-Major Risk 10,829.56 8,945.81 8,500.00 8,202.09 81.91 46.85 172.21 941.95 485.86 3.500 771.33 400.86 645.24 Pass-Major Risk 10,856.22 8,946.10 8,400.00 8,109.70 81.92 45.91 168.13 904.44 493.35 5.687 863.50 392.26 744.32 Pass-Major Risk 10,880.86 8,946.36 8,300.00 8,016.48 81.93 44.97 164.52 869.01 500.78 5.687 956.84 383.14 843.25 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/1/2014 11:23:13AM Page 4 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-3261 @ 56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Offset Design PB DS 02- 02-01-02-01-02-01 Offset Site Error 0.00 usft Survey Program: 100-CB-MAG-MS Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth ON/-S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°I (usft) (usft) (in) (usft) (usft) (usft) 10,923.04 8,946.80 8,200.00 7,922.49 81.96 44.02 166.77 835.68 508.13 5.687 1,051.01 387.16 939.04 Pass-Major Risk 10,976.62 8,947.36 8,100.00 7,827.77 82.01 43.08 172.45 804.46 515.40 5.687 1,145.24 396.16 1,034.13 Pass-Major Risk 11,027.78 8,947.88 8,000.00 7,732.40 82.06 42.18 177.76 775.26 522.64 5.687 1,239.58 400.82 1,130.59 Pass-Major Risk 11,077.26 8,948.37 7,900.00 7,636.82 82.12 41.36 -177.17 746.89 530.34 5.687 1,333.76 401.80 1,227.70 Pass-Major Risk 11,119.59 8,948.77 7,800.00 7,541.42 82.17 40.51 -174.07 718.08 538.60 5.687 1,427.54 399.65 1,325.18 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/1/2014 11:23:13AM Page 5 COMPASS 5000 1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-328:©56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-32B:i 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Offset Design PB DS 02- 02-01A-02-01A-02-01A Offset Site Error: 0.00 usft Survey Program: 100-GVD-CT-CMS Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (in) (usft) (usft) (usft) 10,650.00 8,943.76 9,640.00 8,975.62 81.88 14.42 72.74 1,344.62 1,173.61 6.875 589.23 309.68 281.58 Pass-Major Risk 10,658.45 8,943.87 9,600.00 8,956.33 81.88 14.25 75.63 1,314.59 1,155.56 6.875 563.72 310.66 254.71 Pass-Major Risk 10,688.36 8,944.23 9,500.00 8,908.11 81.89 13.83 84.69 1,239.49 1,110.45 6.875 505.73 314.32 194.16 Pass-Major Risk 10,890.00 8,946.46 9,400.00 8,847.81 81.94 13.30 75.08 1,169.04 1,074.13 6.875 467.20 282.77 193.14 Pass-Major Risk 10,912.54 8,946.69 9,300.00 8,767.76 81.95 12.89 88.97 1,112.60 1,054.92 6.875 452.84 288.33 188.06 Pass-Major Risk,CC,ES,SF 10,935.26 8,946.93 9,200.00 8,685.17 81.97 12.49 103.03 1,058.77 1,038.18 6.875 462.28 293.35 216.90 Pass-Major Risk 10,960.02 8,947.19 9,100.00 8,602.97 81.99 12.08 116.34 1,004.60 1,020.60 6.875 489.33 298.18 269.35 Pass-Major Risk 10,987.95 8,947.48 9,000.00 8,521.67 82.02 11.68 128.42 948.94 1,003.50 6.875 531.17 302.83 337.60 Pass-Major Risk 11,018.58 8,947.79 8,900.00 8,440.93 82.05 11.26 139.18 892.67 985.79 6.875 584.04 306.62 414.98 Pass-Major Risk 11,050.00 8,948.10 8,800.00 8,360.37 82.09 10.85 148.48 836.05 968.32 6.875 645.55 309.63 497.39 Pass-Major Risk 11,086.03 8,948.46 8,700.00 8,277.40 82.13 10.47 156.90 782.36 953.21 6.875 716.33 311.79 584.42 Pass-Major Risk 11,128.29 8,948.86 8,600.00 8,191.92 82.18 10.10 161.59 731.49 943.00 6.875 794.80 311.80 674.59 Pass-Major Risk 11,209.89 8,949.61 8,500.00 8,104.48 82.25 9.76 154.24 683.42 936.56 6.875 876.73 304.11 767.74 Pass-Major Risk 11,280.82 8,950.25 8,400.00 8,015.91 82.34 9.43 148.04 637.21 932.28 9.062 960.09 291.90 861.53 Pass-Major Risk 11,344.14 8,950.79 8,300.00 7,927.14 82.43 9.10 142.56 591.21 930.44 9.062 1,044.31 276.64 954.75 Pass-Major Risk 11,386.13 8,951.14 8,200.00 7,838.55 82,49 8.77 143.26 544.83 930.60 9.062 1,129.23 273.76 1,045.39 Pass-Major Risk 11,416.94 8,951.45 8,100.00 7,750.10 82.55 8.45 148.38 498.21 932.38 9.062 1,215.39 281.44 1,134.83 Pass-Major Risk 11,450.00 8,951.84 8,000.00 7,661.66 82.62 8.12 153.38 451.65 935.58 9.062 1,302.61 288.58 1,224.33 Pass-Major Risk 11,484.35 8,952.32 7,900.00 7,573.34 82.69 7.80 158.21 404.97 940.11 9.062 1,390.49 294.73 1,313.70 Pass-Major Risk 11,520.22 8,952.89 7,800.00 7,485.23 82.77 7.48 162.97 358.00 945.55 9.062 1,478.69 299.76 1,402.83 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/1/2014 11:23:13AM Page 6 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Offset Design PB DS 02- 02-01 A-02-01 B-02-01 B Offset Site Error: 0.00 usft Survey Program: 100-GV0.CT-CMS,9320-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 555 Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/-S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (soft) (usft) (in) (usft) (usft) (usft) 10,075.00 9932.22 11,772.00 8,848.43 82.03 27.18 26.65 2,885.52 770.92 3.812 1,394.85 169.31 1,225.37 Pass-Major Risk 10,100.00 8,933.24 11,700.00 8,847.71 82.02 26.61 29.70 2,848.39 832.59 3.812 1,386.10 182.82 1,205.07 Pass-Major Risk 10,125.00 8,934.19 11,600.00 8,845.11 82.01 25.88 32.84 2,806.38 923.24 3.812 1,389.26 192.60 1,198.74 Pass-Major Risk 10,150.00 8,935.06 11,500.00 8,845.38 82.00 25.42 35.79 2,780.09 1,019.51 3.812 1,413.88 202.61 1,213.84 Pass-Major Risk 10,165.29 8,935.56 11,400.00 8,855.16 81.99 25.18 37.19 2,764.93 1,117.81 3.812 1,453.01 207.62 1,248.50 Pass-Major Risk 10,188.50 8,936.27 11,300.00 8,867.48 81.98 24,86 39,45 2,737.29 1,213.01 3.812 1,484.53 216.95 1,271.25 Pass-Major Risk 10,413,04 8,940.43 10,800.00 8,869.19 81.88 21.47 49.71 2,394.79 1,554.49 3.812 1,463.47 246.19 1,224.13 Pass-Major Risk 10,435.63 8,940.77 10,700.00 8,871.05 81.88 20.57 52.45 2,299.54 1,584.32 3.812 1,421.83 254.32 1,174.60 Pass-Major Risk 10,450.00 8,940.98 10,600.00 8,873,65 81,88 19,63 54,22 2,200.68 1,598.09 3.812 1,369.81 258.74 1,118.33 Pass-Major Risk 10,475.00 8,941.35 10,500.00 8,874.24 81.87 18.68 57.35 2,100.93 1,595.83 3.812 1,308.24 267.42 1,048.11 Pass-Major Risk 10,500.00 8,941.72 10,400,00 8,880.50 81.87 17.74 60.25 2,003.26 1,575.76 3.812 1,236,22 275.61 967.80 Pass-Major Risk 10,514.87 8,941.93 10,300,00 8,878,79 81,87 16.88 62.35 1,908.71 1,543.64 3.812 1,158.84 279.77 886,21 Pass-Major Risk 10,525.00 8,942.08 10,200.00 8,876.39 81.87 16.13 64.00 1,819.09 1,499.48 3.812 1,076.04 282.28 800.82 Pass-Major Risk 10,550,00 8,942.43 10,100,00 8,882.28 81.87 15.45 66.99 1,730.87 1,452.84 3.812 993.08 289,31 710.59 Pass-Major Risk 10,575.00 8,942.78 10,000.00 8,895.28 81.87 14.86 69.53 1,644.13 1,404.90 3.812 911.47 295.61 622.33 Pass-Major Risk 10,589.35 8,942.97 9,900.00 8,903.98 81.87 14.33 71.02 1,557.78 1,355.36 3.812 831.18 298.54 538.85 Pass-Major Risk 10,614.60 8,943,31 9,800.00 8,910.00 81.87 13.87 73.94 1,468.93 1,310.14 3.812 757.23 303.71 459.43 Pass-Major Risk 10,636.55 8,943.59 9,700.00 8,915.75 81.87 13.57 76.50 1,391.31 1,247.74 3.812 673.82 307.65 371.72 Pass-Major Risk 10,658.23 8,943.86 9,600.00 8,919.43 81.88 13.30 79.22 1,320.11 1,177.70 3.812 587.44 310.89 281.71 Pass-Major Risk 10,687.15 8,944.21 9,500.00 8,899.29 81.89 13.08 85.44 1,243.29 1,117.89 3.812 514.54 314.47 205.70 Pass-Major Risk 10,840.54 8,945.93 9,400.00 8,844.27 81.92 12.97 81.33 1,173.54 1,073.51 3.812 469.44 297.91 184.01 Pass-Major Risk,ES,SF 10,912.54 8,946.69 9,300.00 8,767.76 81.95 12.89 88.97 1,112.60 1,054.92 6.875 452.84 288.33 188.06 Pass-Major Risk,CC 10,935.26 8,946.93 9,200.00 8,685.17 81.97 12.49 103.03 1,058.77 1,038.18 6.875 462.28 293.35 216.90 Pass-Major Risk 10,960.02 8,947.19 9,100.00 8,602.97 81.99 12.08 116.34 1,004.60 1,020.60 6.875 489.33 298.18 269.35 Pass-Major Risk 10,987.95 8,947.48 9,000.00 8,521.67 82.02 11.68 128.42 948.94 1,003.50 6.875 531.17 302.83 337.60 Pass-Major Risk 11,018.58 8,947.79 8,900.00 8,440.93 82.05 11.26 139.18 892.67 985.79 6.875 584.04 306.62 414.98 Pass-Major Risk 11,050.00 8,948.10 8,800.00 8,360.37 82.09 10.85 148.48 836.05 968.32 6.875 645.55 309.63 497.39 Pass-Major Risk 11,086.03 8,948.46 8,700.00 8,277.40 82.13 10.47 156.90 782.36 953.21 6.875 716.33 311.79 584.42 Pass-Major Risk 11,128.29 8,948.86 8,600.00 8,191.92 82.18 10.10 161.59 731.49 943.00 6.875 794.80 311.80 674.59 Pass-Major Risk 11,209.89 8,949.61 8,500.00 8,104.48 82.25 9.76 154.24 683.42 936.56 6.875 876.73 304.11 767.74 Pass-Major Risk 11,280.82 8,950.25 8,400.00 8,015.91 82.34 9.43 148.04 637.21 932.28 9.062 960.09 291.90 861.53 Pass-Major Risk 11,344.14 8,950.79 8,300.00 7,927.14 82.43 9.10 142.56 591.21 930.44 9.062 1,044.31 276.64 954.75 Pass-Major Risk 11,386.13 8,951.14 8,200.00 7,838.55 82.49 8.77 143.26 544.83 930.60 9.062 1,129.23 273.76 1,045.39 Pass-Major Risk 11,416.94 8,951.45 8,100.00 7,750.10 82.55 8.45 148.38 498.21 932.38 9.062 1,215.39 281.44 1,134.83 Pass-Major Risk 11,450.00 8,951.84 8,000.00 7,661.66 82.62 8.12 153.38 451.65 935.58 9.062 1,302.61 288.58 1,224.33 Pass-Major Risk 11,484.35 8,952.32 7,900.00 7,573.34 82.69 7.80 158.21 404.97 940.11 9.062 1,390.49 294.73 1,313.70 Pass-Major Risk 11,520.22 8,952.89 7,800.00 7,485.23 82.77 7.48 162.87 358.00 945.55 9.062 1,478.69 299.76 1,402.83 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/1/2014 11:23:13AM Page 7 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B.@ 56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Offset Design PB DS 02- 02-01 A-02-01 C-02-01 C Offset Site Error: 0.00 usft Survey Program: 112-GYD-CT-CMS,2914-INC+TREND,3459-MWD+IFR+MS-WOCA Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +EI-W Hole Size Centre Distance Deviation (usft) (usft) (ustt) (usft) (usft) (usft) (°) (usft) (usft) (in) (usft) (usft) (usft) 11,265.08 8,950.11 9,900.00 8,986.35 82.32 29.77 -108.15 306.25 -74.54 4.312 877.89 290.69 587.21 Pass-Major Risk 11,285.66 8,950.29 9,800.00 8,985.80 82.34 29.65 -110.57 281.90 22.44 4.312 795.47 286.89 508.59 Pass-Major Risk 11,300.00 8,950.42 9,700.00 8,983.85 82.36 29.53 -112.34 264.30 120.83 4.312 711.73 284.17 427.56 Pass-Major Risk 11,325.00 8,950.63 9,600.00 8,976.45 82.40 29.42 -115.89 253.53 219.94 4.312 626.73 279.94 346.78 Pass-Major Risk 11,350.00 8,950.84 9,500.00 8,963.20 82.43 29.31 -120.23 248.15 318.89 4.312 542.05 275.83 266.28 Pass-Major Risk 11,604.65 8,954.49 9,200.00 8,877.09 82.96 29.05 -113.80 259.80 604.45 4.312 283.81 317.55 -15.62 FAIL-Major Risk 11,605.67 8,954.51 9,100.00 8,829.32 82.96 28.99 -132.71 263.69 692.19 4.312 230.49 317.83 -22.57 FAIL-Major Risk,ES,SF 11,606.41 8,954.53 9,000.00 8,770.64 82.96 28.95 -157.85 266.79 772.95 4.312 226.60 318.03 68.95 Pass-Major Risk,CC 11,606.72 8,954.54 9,300.00 8,816.68 82.98 29.13 -102.63 254.32 512.87 4.312 362.85 317.79 49.11 Pass-Major Risk 11,614.08 8,954.69 8,900.00 8,699.28 82.98 28.91 -176.61 262.09 842.54 4.312 277.44 319.35 200.15 Pass-Major Risk 11,625.00 8,954.93 8,800.00 8,619.41 83.01 28.89 173.92 251.41 901.74 4.312 357.41 321.13 280.55 Pass-Major Risk 11,633.07 8,955.11 8,700.00 8,534.31 83.03 28.88 169.29 240.70 953.00 4.312 448.93 322.37 351.25 Pass-Major Risk 11,637.44 8,955.21 9,400.00 8,944.02 83.04 29.21 -93.68 247.70 416.99 4.312 455.24 322.42 133.65 Pass-Major Risk 11,639.47 8,955.25 8,600.00 8,443.66 83.04 28.87 167.55 230.62 993.93 4.312 546.25 323.35 437,90 Pass-Major Risk 11,643.99 8,955.36 8,500.00 8,351.40 83.05 28.87 166.67 221.99 1,031.52 4.312 644.98 324.07 530.39 Pass-Major Risk 11,650.00 8,955.50 8,100.00 7,988.10 83.07 28.88 163.54 193.01 1,196.28 7.750 1,040.88 325.47 909,01 Pass-Major Risk 11,650.00 8,955.50 8,200.00 8,079.19 83.07 28.88 164.16 200.03 1,155.64 7.750 941.52 325.45 812.36 Pass-Major Risk 11,650.00 8,955.50 8,300.00 8,169.44 83.07 28.88 165.06 207.16 1,113.16 7.750 842.57 325.41 717.38 Pass-Major Risk 11,650.00 8,955.50 8,400.00 8,260.07 83.07 28.88 166.13 214.50 1,071.55 7.750 743.75 325.31 623.25 Pass-Major Risk 11,656.26 8,955.64 8,000.00 7,894.47 83.08 28.88 164.11 185.59 1,230.53 7.750 1,140.73 326.30 1,007.85 Pass-Major Risk 11,658.78 8,955.70 7,900.00 7,799.06 83.09 28.87 164.52 177.35 1,259.31 7.750 1,240.58 326.61 1,108.16 Pass-Major Risk 11561.84 8,955.77 7,800.00 7,702.36 83.09 28.87 165.21 168.01 1,282.96 7.750 1,340.13 326.97 1,209.07 Pass-Major Risk 11,665.51 8,955.86 7,700.00 7,604.86 83.10 28.87 166.08 157.37 1,302.40 7.750 1,439.28 327.39 1,310.11 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/1/2014 11:23:13AM Page 8 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset ND Reference: Offset Datum Offset Design PB DS 02- 02-01A-02-01 C-Copy of 02-01 C Plan 2 Offset Site Error: 0.00 usft Survey Program: 112-GYD-CT-CMS,2912-GYD-CT-CMS,2922-INC+TREND,3338-MWD+IFR,4418-MWD+IFR+MS-WOCA,85274.i Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) i-i (usft) (usft) (in) (usft) (usft) (usft) 11,250.00 8,949.98 9,900.00 8,982.00 82.30 18.44 -106.62 342.98 -101.79 4.312 892.20 291.26 600.93 Pass-Major Risk 11,275.00 8,950.20 9,800.00 8,982.00 82.33 18.24 -109.54 324.77 -3.46 4.312 804.73 287.60 517.13 Pass-Major Risk 11,287.17 8,950.31 9,700.00 8,982.00 82.34 18.07 -110.93 306.56 94.87 4.312 719.01 285.45 433.56 Pass-Major Risk 11,310.12 8,950.50 9,600.00 8,981.92 82.38 17.93 -113.59 288.32 193.19 4.312 635.81 281.54 354.26 Pass-Major Risk 11,336.10 8,950.72 9,500.00 8,973.53 82.41 17.79 -117.45 271.37 291.30 4.312 555.08 276.80 278.27 Pass-Major Risk 11,364.70 8,950.96 9,400.00 8,951.59 82.46 17.67 -123.50 257.20 387.74 4.312 478.40 271.20 207.50 Pass-Major Risk 11,638.57 8,955.23 8,700.00 8,516.79 83.04 17.28 174.34 234.01 920.20 4.312 461.59 309.46 381.83 Pass-Major Risk 11,839.97 8,955.27 8,600.00 8,432.70 83.04 17.26 169.88 229.94 974.01 4.312 552.80 309.61 456.31 Pass-Major Risk 11,640.40 8,955.28 8,800.00 8,593.17 83.04 17.33 -177.05 234.44 855.75 4.312 382.91 309.48 313.37 Pass-Major Risk 11,640.87 8,955.29 9,300.00 8,916.51 83.04 17.56 -97.89 246.10 480.65 4.312 394.92 308.93 89.27 Pass-Major Risk 11,643.57 8,955.35 8,500.00 8,342.88 83.05 17.25 168.02 222.63 1,017.29 5.562 649.77 309.97 544.12 Pass-Major Risk 11,644.19 8,955.36 8,900.00 8,666.86 83.05 17.38 -163.88 233.73 788.16 4.312 319.87 309.56 208.07 Pass-Major Risk 11,649.55 8,955.48 9,000.00 8,740.55 83.06 17.39 -145.68 233.01 720.56 4.312 279.25 309.70 95.31 Pass-Major Risk 11,650.00 8,955.50 8,200.00 8,070.99 83.07 17.18 165.10 199.16 1,141.88 7.750 945.23 310.64 824.40 Pass-Major Risk 11,650.00 8,955.50 8,300.00 8,161.62 83.07 17.19 166.04 206.98 1,100.35 7.750 846.40 310.59 729.41 Pass-Major Risk 11,650.00 8,955.50 8,400.00 8,252.25 83.07 17.22 167.23 214.81 1,058.82 7.750 747.88 310.55 635.73 Pass-Major Risk 11,654.99 8,955.61 9,100.00 8,809.95 83.08 17.43 -124.38 233.89 648.68 4.312 277.30 309.84 22.37 Pass-Major Risk,CC,ES,SF 11,655.32 8,955.62 8,100.00 7,980.36 83.08 17.16 164.96 191.33 1,183.41 7.750 1,044.27 310.97 920.22 Pass-Major Risk 11,656.05 8,955.64 9,200.00 8,868.99 83.08 17.48 -106.93 238.28 568.19 4.312 321.03 309.79 27.26 Pass-Major Risk 11,657.54 8,955.67 8,000.00 7,889.63 83.08 17.15 164.60 183.45 1,224.72 7.750 1,143.49 311.15 1,016.86 Pass-Major Risk 11,660.32 8,955.74 7,900.00 7,797.08 83.09 17.15 164.63 174.33 1,261.43 7.750 1,243.15 311.36 1,115.28 Pass-Major Risk 11,663.87 8,955.82 7,800.00 7,702.41 83.10 17.16 165.08 163.56 1,291.70 7.750 1,342.89 311.59 1,215.15 Pass-Major Risk 11,668.19 8,955.92 7,700.00 7,606.06 83.11 17.16 165.88 151.20 1,315.39 7.750 1,442.26 311.82 1,315.72 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/1/2014 11:23:13AM Page 9 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B.) Reference Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Offset Design PB DS 02- 02-08-02-08-02-08 Offset Site Error: 0.00 usft Survey Program: 100-CB-GYRO-MS Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Too!face r. Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth *NIS +E1-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) ;.. (usft) (in) (usft) (usft) (usft) 9,280.00 8,852.74 9,600.00 8,706.11 14.00 148.15 -90.17 1,160.51 -1,597.95 3.500 1,294.09 477.78 836.32 Pass-Major Risk,CC 9,300.00 8,859.29 9,700.00 8,790.80 20.88 151.03 -91.58 1,211.08 -1,614.39 3.500 1,299.57 498.13 812.98 Pass-Major Risk 9,325.00 8,865.84 9,800.00 8,876.06 30.02 153.87 -92.81 1,260.77 -1,630.53 3.500 1,311.01 521.83 792.86 Pass-Major Risk 9,350.00 8,870.52 9,900.00 8,961.89 39.48 156.66 -94.06 1,309.58 -1,646.39 3.500 1,328.60 544.99 782.44 Pass-Major Risk,ES,SF 9,350.00 8,870.52 10,000.00 9,048.05 39.48 158.06 -97.32 1,357.85 -1,662.08 3.500 1,352.60 548.64 802.64 Pass-Major Risk 9,360.45 8,872.08 10,020.00 9,065.28 43.46 158.34 -96.15 1,367.50 -1,665.22 3.500 1,358.01 551.60 805.46 Pass-Major Risk CC-Min centre to center distance or covergent point.SF-min separation factor,ES-min ellipse separation 8/1/2014 11.23:13AM Page 10 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B.@ 56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Offset Design PB DS 02- 02-08-02-08A-02-08A Offset Site Error. 0.00 usft Survey Program: 100-CB-GYRO-MS,9702-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/-S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) 11 (usft) (usft) (in) (usft) (usft) lush) 9,280.00 8,852.74 9,600.00 8,706.11 14.00 148.15 -90.17 1,160.51 -1,597.95 6.875 1,294.09 478.06 836.04 Pass-Major Risk 9,300.00 8,859.29 9,700.00 8,790.80 20.88 151.03 -91.58 1,211.08 -1,614.39 6.875 1,299.57 498.41 812.70 Pass-Major Risk 9,325.00 8,865.84 9,800.00 8,860.16 30.02 151.10 -91.92 1,282.01 -1,622.13 3.500 1,301.92 511.75 793.82 Pass-Major Risk 9,350.00 8,870.52 9,900.00 8,908.02 39.48 151.11 -91.43 1,368.38 -1,609.91 3.500 1,289.64 527.99 762.40 Pass-Major Risk 9,375.00 8,874.26 10,000.00 8,931.88 49.02 151.12 -87.54 1,464.44 -1,599.11 3.500 1,284.33 532.39 752.52 Pass-Major Risk,CC,ES,SF 9,400.00 8,877.96 10,100.00 8,932.27 58.52 151.15 -82.59 1,564.09 -1,591.06 3.500 1,287.57 534.12 755.22 Pass-Major Risk 9,410.67 8,879.53 10,200.00 8,931.93 62.52 151.17 -80.07 1,663.37 -1,579.14 3.500 1,293.04 534.33 761.27 Pass-Major Risk 9,425.00 8,881.61 10,300.00 8,926.41 67.93 151.21 -76.71 1,761.02 -1,558.73 3.500 1,296.17 532.62 767.19 Pass-Major Risk 9,450.00 8,885.17 10,400.00 8,923.51 77.22 151.24 -71.62 1,857.15 -1,531.41 3.500 1,298.66 526.97 778.48 Pass-Major Risk 9,463.57 8,887.08 10,500.00 8,923.10 79.74 151.27 -68.62 1,955.89 -1,516.06 3.500 1,319.54 514.90 810.42 Pass-Major Risk 9,475.00 8,888.63 10,600.00 8,923.57 81.86 151.33 -66.06 2,055.20 -1,504.51 3.500 1,350.08 504.20 852.59 Pass-Major Risk 9,500.00 8,891.94 10,700.00 8,920.72 81.88 151.38 -61.03 2,154.38 -1,492.05 3.500 1,385.06 463.22 929.83 Pass-Major Risk 9,511.62 8,893.43 10,800.00 8,919.19 81.89 151.44 -58.42 2,253.52 -1,479.14 3.500 1,424.82 443.59 990.10 Pass-Major Risk 9,525.00 8,895.09 10,900.00 8,919.92 81.89 151.51 -55.63 2,353.02 -1,469.14 3.500 1,472.04 420.33 1,061.29 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/1/2014 11:23:13AM Page 11 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-328:@ 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Offset Design PB DS 02- 02-08-02-08APB1-02-08APB1 Offset Site Error. 0.00 usft Survey Program: 100-CB-GYRO-MS,9760-BLIND Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/-S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (in) (usft) (usft) (usft) 9,280.00 8,852.74 9,600.00 8,706.11 14.00 148.15 -90.17 1,160.51 -1,597.95 6.875 1,294.09 478.06 836.04 Pass-Major Risk,CC 9,300.00 8,859.29 9.700.00 8,790.80 20.88 151.03 -91.58 1,211.08 -1,614.39 6.875 1,299.57 498.41 812.70 Pass-Major Risk 9,325.00 8,865.84 9,800.00 8,873.39 30.02 151.92 -92.65 1,265.14 -1,627.10 3.937 1,307.39 515.45 795.50 Pass-Major Risk 9,325.00 8,865.84 9,808.00 8,878.88 30.02 151.92 -92.83 1,270.96 -1,627.13 3.937 1,307.26 515.45 795.18 Pass-Major Risk,ES,SF CC-Min centre to center distance or covergent point.SF-min separation factor.ES-min ellipse separation 8/1/2014 11:23:13AM Page 12 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-328:©56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-32B:©56.60usft(2-326:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Offset Design PB DS 02- 02-08-02-08B-02-08B Offset Site Error: 0.00 usft Survey Program: 100-CB-GYRO-MS,9102-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NiS +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) P1 (usft) (usft) (in) (use) (usft) (usft) 9,270.68 8,849.37 9,700.00 8,822.90 11.31 133.78 -95.99 1,126.16 -1,426.63 4.312 1,119.26 425.49 702.81 Pass-Major Risk 9,300.00 8,859.29 9,800.00 8,889.69 20.88 133.79 -96.63 1,185.97 -1,383.02 4.312 1,069.36 443.58 629.43 Pass-Major Risk 9,325.00 8,865.84 9,900.00 8,933.50 30.02 133.80 -96.28 1,257.62 -1,329.41 4.312 1,012.51 459.29 553.78 Pass-Major Risk 9,350.00 8,870.52 10,000.00 8,950.69 39.48 133.80 -94.78 1,333.91 -1,267.58 4.312 949.72 475.68 473.36 Pass-Major Risk 9,375.00 8,874.26 10,100.00 8,947.62 49.02 133.81 -89.84 1,413.06 -1,206.69 4.312 890.98 483.32 408.50 Pass-Major Risk 9,400.00 8,877.96 10,200.00 8,941.66 58.52 133.82 -84.46 1,499.35 -1,156.70 4.312 849.64 486.50 364.30 Pass-Major Risk 9,425.00 8,881.61 10,300.00 8,942.72 67.93 133.83 -79.34 1,591.77 -1,118.95 4.312 829.63 486.64 34.4.59 Pass-Major Risk,CC,ES,SF 9,450.00 8,885.17 10,400.00 8,939.59 77.22 133.86 -73.78 1,689.53 -1,098.92 4.312 836.51 483.87 354.99 Pass-Major Risk 9,475.00 8,888.63 10,500.00 8,929.78 81.86 133.90 -67.78 1,788.81 -1,094.17 4.312 866.59 463.31 406.44 Pass-Major Risk 9,486.19 8,890.13 10,600.00 8,919.70 81.87 133.96 -64.32 1,887.48 -1,106.23 4.312 918.85 447.62 475.92 Pass-Major Risk 9,500.00 8,891.94 10,700.00 8,917.14 81.88 134.04 -61.07 1,984.46 -1,130.27 4.312 986.76 427.32 565.31 Pass-Major Risk 9,525.00 8,895.09 10,800.00 8,913.97 81.89 134.13 -55.96 2,079.59 -1,160.90 4.312 1,063.27 388.01 682.13 Pass-Major Risk 9,525.00 8,895.09 10,900.00 8,908.77 81.89 134.25 -55.26 2,173.82 -1,193.98 4.312 1,143.90 389.14 762.54 Pass-Major Risk 9,538.63 8,896.73 11,000.00 8,902.06 81.90 134.37 -52.20 2,266.90 -1,229.89 4.312 1,228.48 367.48 869.47 Pass-Major Risk 9,550.00 8,898.06 11,100.00 8,897.24 81.91 134.51 -49.71 2,359.65 -1,266.93 4.312 1,315.54 349.32 975.11 Pass-Major Risk 9,550.00 8,898.06 11,200.00 8,895.55 81.91 134.67 -49.42 2,452.17 -1,304.83 4.312 1,404.56 350.43 1,063.57 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/1/2014 11:23:13AM Page 13 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B) Reference Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Offset Design PB DS 02- 02-09-02-09D-02-09D Offset Site Error: 0.00 usft Survey Program: 99-CB-GYRO-MS,4644-MWD+IFR+MS-WOCA,10367-INC+TREND,10426-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +EI-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°l (usft) (usft) (in) (usft) (usft) (usft) 10,100.00 8,933.24 12,900.00 8,886.93 82.02 42.45 28.79 2,419.12 678.89 3.500 930.73 264.84 665.45 Pass-Major Risk 10,100.00 8,933.24 12,914.00 8,885.95 82.02 42.54 28.80 2,432.86 681.38 3.500 944.14 268.20 675.48 Pass-Major Risk 10,125.00 8,934.19 12,800.00 8,892.77 82.01 41.78 31.69 2,320.44 664.67 3.500 836.44 264.91 571.22 Pass-Major Risk 10,139.92 8,934.72 12,700.00 8,893.54 82.00 40.84 33.81 2,221.22 675.17 3.500 755.18 270.43 484.47 Pass-Major Risk 10,175.00 8,935.87 12,600.00 8,897.38 81.98 39.68 38.05 2,127.89 709.96 3.500 695.24 284.09 410.97 Pass-Major Risk 10,211.38 8,936.90 12,500.00 8,899.97 81.97 38.38 42.42 2,049.29 771.09 3.500 668.98 296.07 372.82 Pass-Major Risk,CC 10,250.00 8,937.82 12,400.00 8,900.65 81.95 37.10 47.04 1,990.25 851.44 3.500 678.43 307.46 370.98 Pass-Major Risk,ES,SF 10 375.00 8,939.86 12,300.00 8,900.07 81.89 36.00 45.24 1,951.79 943.62 3.500 718.14 296.76 421.43 Pass-Major Risk 10,410.67 8,940.39 12,200.00 8,898.56 81.89 35.02 49.52 1,913.49 1,035.94 3.500 755.03 306.80 448.30 Pass-Major Risk 10,442.06 8,940.86 12,100.00 8,900.62 81.88 34.29 52.96 1,888.80 1,132.42 3.500 810.40 314.99 495.46 Pass-Major Risk 10,466.11 8,941.22 12,000.00 8,899.76 81.87 33.87 55.68 1,882.89 1,232.19 3.500 884.85 320.75 564.14 Pass-Major Risk 10,500.00 8,941.72 11,900.00 8,900.72 81.87 33.36 59.52 1,858.35 1,328.81 3.500 949.35 329.08 620.29 Pass-Major Risk 10,525.00 8,942.08 11,800.00 8,899.84 81.87 32.80 62.46 1,815.16 1,418.93 3.500 1,002.54 333.84 668.82 Pass-Major Risk 10,550.00 8,942.43 11,700.00 8,902.04 81.87 32.48 65.20 1,787.90 1,514.93 3.500 1,072.97 339.73 733.90 Pass-Major Risk 10,562.93 8,942.61 11,600.00 8,908.15 81.87 32.20 66.33 1,759.08 1,610.13 3.500 1,144.83 341.83 804.12 Pass-Major Risk 10,586.02 8,942.93 11,500.00 8,913.82 81.87 31.83 68.76 1,710.56 1,697.18 3.500 1,204.44 346.44 859.66 Pass-Major Risk 10,610.41 8,943.25 11,400.00 8,914.75 81.87 31.43 71.61 1,646.99 1,774.26 3.500 1,253.35 350.91 904.64 Pass-Major Risk 10,625.00 8,943.44 11,300.00 8,915.62 81.87 31.15 73.28 1,591.86 1,857.34 3.500 1,314.79 352.96 964.54 Pass-Major Risk 10,650.00 8,943.76 11,200.00 8,913.44 81.88 30.94 76.31 1,544.05 1,944.95 3.500 1,385.75 357.29 1,031.63 Pass-Major Risk 10,675.00 8,944.07 11,100.00 8,912.34 81.88 30.87 79.30 1,477.41 2,019.20 3.500 1,442.16 360.93 1,084.83 Pass-Major Risk 10,950.00 8,947.09 11,000.00 8,913.83 81.99 30.35 70.37 1,395.24 2,075.86 3.500 1,464.94 345.51 1,124.90 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/1/2014 11:23:13AM Page 14 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Offset Design PB DS 02- 02-10-02-10-02-10 Offset Site Error: 0.00 usft Survey Program: 140-CB-MAG-MS Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbo re Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth ,NJ.S +Er-1N Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (in) (usft) (use) (usft) 12,611.04 8,976.79 7,800.00 7,799.56 85.93 16.94 -171.97 -1,044.26 236.26 9.062 1,403.68 328.39 1,210.78 Pass-Major Risk 12,611.68 8,976.80 7,900.00 7,899.56 85.93 16.47 -169.67 -1,044.76 235.36 9.062 1,321.27 326.87 1,119.23 Pass-Major Risk 12,612.30 8,976.81 8,000.00 7,999.55 85.93 16.00 -167.04 -1,045.29 234.29 9.062 1,241.55 325.34 1,029.48 Pass-Major Risk 12,612.81 8,976.82 8,100.00 8,099.54 85.94 15.51 -164.04 -1,045.57 233.02 9.062 1,165.02 323.78 942.03 Pass-Major Risk 12,613.31 8,976.83 8,200.00 8,199.53 85.94 15.02 -160.61 -1,045.86 231.74 9.062 1,092.29 322.22 857.52 Pass-Major Risk 12,613.78 8,976.84 8,300.00 8,299.52 85.94 14.53 -156.69 -1,046.11 230.33 9.062 1,024.24 320.67 776.93 Pass-Major Risk 12,614.25 8,976.84 8,400.00 8,399.51 85.94 14.04 -152.23 -1,046.49 228.71 9.062 961.99 319.12 701.61 Pass-Major Risk 12,614.67 8,976.85 8,500.00 8,499.49 85.94 13.56 -147.17 -1,046.77 227.00 6.875 906.56 317.40 633.23 Pass-Major Risk 12,614.94 8,976.85 8,800.00 8,599.48 85.95 13.09 -141.49 -1,046.61 225.27 6.875 859.07 315.96 573.19 Pass-Major Risk 12,615.23 8,976.86 8,700.00 8,699.46 85.95 12.62 -135.21 -1,046.55 223.54 6.875 821.11 314.49 524.27 Pass-Major Risk 12,615.63 8,976.86 8,800.00 8,799.45 85.95 12.14 -128.42 -1,046.73 221.90 6.875 794.02 312.97 488.92 Pass-Major Risk 12,616,07 8,976.87 8,900.00 8,899.44 85.95 11.66 -121.27 -1,047.08 220.23 6.875 779.03 311.44 469.35 Pass-Major Risk 12,616.50 8,976.88 9,000.00 8,999.42 85.95 11.18 -113.95 -1,047.41 218.52 6.875 776.75 309.92 466.84 Pass-Major Risk,CC,ES,SF 12,616.92 8,976.88 9,100.00 9,099.41 85.95 10.73 -106.71 -1,047.72 216.81 6.875 787.25 308.59 480.58 Pass-Major Risk 12,616.99 8,976.89 9,112.00 9,111.40 85.95 10.70 -105.86 -1,047.80 216.62 6.875 789.36 308.59 482.26 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 811/2014 11:23:13AM Page 15 COMPASS 5000.1 Build 61 • BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B.) Reference Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Offset Design PB DS 02- 02-10-02-10A-02-10A Offset Site Error: 0.00 usft Survey Program: 140-CB-MAG-MS,8679-MWD,9095-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/-S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°I (usft) (usft) (in) (usft) (usft) (usft) 11,499.74 8,952.55 10,375.00 8,961.76 82.72 21.99 -104.49 327.89 666.36 3.500 193.54 332.69 -139.07 FAIL-Major Risk,CC,ES,SF 11,613.14 8,954.67 10,300.00 8,968.47 82.98 21.28 -90.07 259.76 635.78 3.500 235.31 346.03 -110.46 FAIL-Major Risk 11,782.98 8,958.90 10,200.00 8,972.58 83.37 20.40 -73.12 170.33 591.32 3.500 266.29 339.45 -72.89 FAIL-Major Risk 11,842.37 8,960.52 10,100.00 8,976.08 83.47 19.55 -80.13 84.01 540.97 3.500 299.14 342.69 -43.28 FAIL-Major Risk 11,900.00 8,962.07 10,000.00 8,978.55 83.58 18.67 -87.15 -4.25 494.31 3.500 339.19 342.11 -2.71 FAIL-Major Risk 11,950.00 8,963.37 9,900.00 8,977.22 83.70 17.85 -93.80 -97.16 457.38 3.500 379.53 338.70 40.91 Pass-Major Risk 12,000.00 8,964.61 9,800.00 8,979.40 83.83 17.05 -99.83 -191.72 425.02 3.500 425.12 332.93 92.24 Pass-Major Risk 12,037.43 8,965.50 9,700.00 8,979.28 83.93 16.42 -104.66 -281.87 382.01 3.500 487.95 327.06 160.90 Pass-Major Risk 12,338.71 8,971.90 9,600.00 8,973.55 84.96 15.76 -82.20 -367.61 330.94 3.500 553.33 336.29 217.04 Pass-Major Risk 12,375.00 8,972.59 9,500.00 8,974.39 85.06 15.12 -86.56 -457.25 286.79 3.500 588.92 336.98 251.94 Pass-Major Risk 12,425.00 8,973.54 9,400.00 8,983.56 85.22 14.52 -91.76 -550.36 251.74 3.500 623.33 336.65 286.68 Pass-Major Risk 12,463.35 8,974.25 9,300.00 8,993.76 85.35 13.99 -95.57 -647.51 231.33 3.500 651.50 334.53 317.02 Pass-Major Risk 12,500.00 8,974.92 9,200.00 8,999.73 85.49 13.57 -99.56 -747.21 230.23 3.500 669.14 331.49 337.74 Pass-Major Risk 12,550.00 8,975.79 9,100.00 8,993.00 85.68 13.30 -106.21 -846.45 238.32 3.500 685.72 325.99 359.74 Pass-Major Risk 12,575.00 8,976.21 9,000.00 8,967.15 85.78 13.06 -111.41 -941.42 242.05 3.500 713.15 322.18 391.06 Pass-Major Risk 12,600.00 8,976.62 8,900.00 8,892.88 85.88 12.97 -120.04 -1,005.06 230.23 3.500 753.32 317.99 437.52 Pass-Major Risk 12,611.04 8,976.79 7,800.00 7,799.56 85.93 16.94 -171.97 -1,044.26 236.26 9.062 1,403.68 328.39 1,210.78 Pass-Major Risk 12,611.68 8,976.80 7,900.00 7,899.56 85.93 16.47 -169.67 -1,044.76 235.36 9.062 1,321.27 326.87 1,119.23 Pass-Major Risk 12,611.95 8,976.81 8,800.00 8,798.64 85.93 12.95 -128.09 -1,036.51 221.12 3.500 790.65 315.79 482.92 Pass-Major Risk 12,612.30 8,976.81 8,000.00 7,999.55 85.93 16.00 -167.04 -1,045.29 234.29 9.062 1,241.55 325.34 1,029.48 Pass-Major Risk 12,612.81 8,976.82 8,100.00 8,099.54 85.94 15.51 -164.04 -1,045.57 233.02 9.062 1,165.02 323.78 942.03 Pass-Major Risk 12,613.31 8,976.83 8,200.00 8,199.53 85.94 15.02 -160.61 -1,045.86 231.74 9.062 1,092.29 322.22 857.52 Pass-Major Risk 12,613.78 8,976.84 8,300.00 8,299.52 85.94 14.53 -156.69 -1,046.11 230.33 9.062 1,024.24 320.67 776.93 Pass-Major Risk 12,614.25 8,976.84 8,400.00 8,399.51 85.94 14.04 -152.23 -1,046.49 228.71 9.062 961.99 319.12 701.61 Pass-Major Risk 12,614.67 8,976.85 8,500.00 8,499.49 85.94 13.56 -147.17 -1,046.77 227.00 6.875 906.56 317.40 633.23 Pass-Major Risk 12,614.94 8,976.85 8,600.00 8,599.48 85.95 13.13 -141.49 -1,046.61 225.27 3.500 859.07 315.77 573.39 Pass-Major Risk 12,615.19 8,976.86 8,700.00 8,699.46 85.95 12.95 -135.21 -1,046.44 223.53 3.500 821.08 315.19 523.59 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/1/2014 11:23:13AM Page 16 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Offset Design PB DS 02- 02-10-02-10APB1-02-10APB1 Offset Site Error: 0.00 usft Survey Program: 140-CB-MAG-MS,8679-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface n Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth ON/-.6 +E/-W Hole Size Centre Distance Deviation (usft) (soft) (soft) (usft) (soft) (usft) (°) (usft) (usft) (in) (soft) (usft) (usft) 11,940.17 8,963.11 9,886.00 8,950.92 83.67 18.03 -96.18 -86.56 384.18 3.937 451.73 336.51 115.43 Pass-Major Risk,CC,ES,SF 11,975.00 8,964.00 9,800.00 8,955.66 83.76 17.50 -99.82 -170.19 364.80 3.937 480.68 336.50 144.32 Pass-Major Risk 12,025.00 8,965.21 9,700.00 8,962.11 83.90 16.83 -105.07 -264.47 332.27 3.937 531.44 329.95 201.54 Pass-Major Risk 12,336.06 8,971.85 9,600.00 8,968.14 84.95 16.07 -82.39 -356.51 293.65 3.937 591.85 336.75 255.12 Pass-Major Risk 12,375.00 8,972.59 9,500.00 8,974.70 85.06 15.35 -86.52 -451.52 263.28 3.937 612.66 337.57 275.09 Pass-Major Risk 12,425.00 8,973.54 9,400.00 8,977.14 85.22 14.67 -92.35 -548.75 240.18 3.937 634.79 337.08 297.72 Pass-Major Risk 12,463.07 8,974.25 9,300.00 8,981.21 85.35 14.10 -96.64 -647.65 226.54 3.937 656.08 334.89 321.19 Pass-Major Risk 12,500.00 8,974.92 9,200.00 8,986.51 85.49 13.64 -100.70 -747.37 226.10 3.937 672.91 331.69 341.22 Pass-Major Risk 12,550.00 8,975.79 9,100.00 8,992.12 85.68 13.32 -106.29 -846.46 237.98 3.937 686.03 326.07 359.97 Pass-Major Risk 12,575.00 8,976.21 9,000.00 8,967.15 85.78 13.06 -111.41 -941.42 242.05 3.937 713.15 322.21 391.02 Pass-Major Risk 12,600.00 8,978.82 8,900.00 8,892.88 85.88 12.97 -120.04 -1,005.06 230.23 3.937 753.32 318.02 437.47 Pass-Major Risk 12,611.04 8,978.79 7,800.00 7,799.58 85.93 16.94 -171.97 -1,044.26 236.26 9.062 1,403.68 328.39 1,210.71 Pass-Major Risk 12,611.68 8,976.80 7,900.00 7,899.56 85.83 16.47 -169.67 -1,044.76 235.36 9.062 1,321.27 326.87 1,119.17 Pass-Major Risk 12,611.95 8,976.81 8,800.00 8,798.64 85.93 12.95 -128.09 -1,036.51 221.12 3.937 790.65 315.83 482.86 Pass-Major Risk 12,612.30 8,976.81 8,000.00 7,999.55 85.93 16.00 -167.04 -1,045.29 234.29 9.062 1,241.55 325.34 1,029.42 Pass-Major Risk 12,612.81 8,978.82 8,100.00 8,099.54 85.94 15.51 -164.04 -1,045.57 233.02 9.062 1,165.02 323.78 941.97 Pass-Major Risk 12,613.31 8,976.83 8,200.00 8,199.53 85.94 15.02 -160.61 -1,045.66 231.74 9.062 1,092.29 322.22 857,46 Pass-Major Risk 12,613.78 8,976.84 8,300.00 8,299.52 85.94 14.53 -156.69 -1,046.11 230.33 9.062 1,024.24 320.67 776.87 Pass-Major Risk 12,614.25 8,976.84 8,400.00 8,399.51 85.94 14.04 -152.23 -1,046.49 228.71 9.062 961.99 319.12 701.56 Pass-Major Risk 12,614.67 8,976.85 8,500.00 8,499.49 85.94 13.56 -147.17 -1,046.77 227.00 6.875 906.56 317.40 633.18 Pass-Major Risk 12,614.94 8,976.85 8,600.00 8,599.48 85.95 13.13 -141.49 -1,046.61 225.27 3.937 859.07 315.81 573.31 Pass-Major Risk 12,615.19 8,976.86 8,700.00 8,699.46 85.95 12.95 -135.21 -1,046.44 223.53 3.937 821.08 315.23 523.53 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/1/2014 11:23:13AM Page 17 COMPASS 5000 1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Offset Design PB DS 02- 02-10-02-10B-02-10B Offset Site Error: 0.00 usft Survey Program: 138-CB-MAG-MS,7798-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) P) (usft) (usft) (in) (usft) (usft) (usft) 12,425.00 8,973.54 9,400.00 8,987.49 85.22 19.94 -91.79 -594.16 -290.70 3.500 1,167.22 347.32 819.90 Pass-Major Risk 12,425.00 8,973.54 9,500.00 8,992.26 85.22 20.66 -91.61 -586.23 -390.24 3.500 1,266.30 347.34 918.98 Pass-Major Risk 12,425.00 8,973.54 9,600.00 8,994.78 85.22 21.47 -91.56 -579.91 -490.00 3.500 1,365.75 347.35 1,018.43 Pass-Major Risk 12,425.00 8,973.54 9,700.00 8,996.18 85.22 22.35 -91.55 -575.89 -589.89 3.500 1,465.45 347.33 1,118.15 Pass-Major Risk 12,435.78 8,973.74 9,300.00 8,981.56 85.26 19.30 -93.35 -609.60 -192.21 3.500 1,069.70 347.31 722.39 Pass-Major Risk 12,450.00 8,974.01 9,200.00 8,973.55 85.31 18.68 -95.51 -645.20 -99.14 3.500 979.68 346.86 632.81 Pass-Major Risk 12,465.52 8,974.29 9,100.00 8,960.67 85.36 18.18 -98.23 -683.67 -8.00 3.500 893.40 346.11 547.36 Pass-Major Risk 12,487.42 8,974.69 9,000.00 8,917.85 85.44 17.76 -103.91 -735.56 64.98 3.500 830.90 344.60 487.18 Pass-Major Risk 12,510.78 8,975.11 8,900.00 8,854.87 85.53 17.47 -111.50 -789.75 120.23 3.500 794.73 342.54 456.11 Pass-Major Risk,ES,SF 12,525.00 8,975.36 8,800.00 8,768.92 85.58 17.34 -119.67 -826.69 153.34 3.500 789.89 341.02 460.18 Pass-Major Risk,CC 12,537,42 8,975.57 8,700.00 8,673.88 85.63 17.27 -127.89 -851.49 171.88 3.500 809.70 339.60 493.00 Pass-Major Risk 12,550.00 8,975.79 8,600.00 8,578.49 85.68 17.22 -135.61 -877.27 187.34 3,500 843.66 338.00 542.56 Pass-Major Risk 12,558.08 8,975.93 8,500.00 8,482.29 85.71 17.18 -142.19 -901.49 199.76 3.500 889.73 336.89 604.96 Pass-Major Risk 12,566.76 8,976.07 8,400.00 8,385.13 85.75 17.15 -148.14 -923.71 207.95 5.687 947.06 335.83 678.48 Pass-Major Risk 12,575.00 8,976.21 8,300.00 8,288.10 85.78 17.13 -153.44 -946.30 216.56 5.687 1,010.60 334.59 757.78 Pass-Major Risk 12,584.53 8,976.37 8,200.00 8,191.03 85.82 17.11 -158.33 -968.92 224.74 5.687 1,079.79 333.10 841.82 Pass-Major Risk 12,600.00 8,976.62 8,000.00 7,996.94 85.88 17.09 -166.08 -1,015.75 235.24 5.687 1,234.04 330.52 1,020.96 Pass-Major Risk 12,600.00 8,976.62 8,100.00 8,094.05 85.88 17.10 -163.40 -992.14 232.01 5.687 1,154.00 330.54 930.16 Pass-Major Risk 12,608.90 8,976.76 7,900.00 7,899.16 85.92 17.08 -169.45 -1,036.53 236.16 5.687 1,317.74 328.94 1,115.12 Pass-Major Risk 12,611.05 8,976.79 7,800.00 7,799.56 85.93 17.08 -171.94 -1,044.26 236.25 5,687 1,402.27 328.54 1,209.27 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/1/2014 11:23:13AM Page 18 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:©56.60usft(2-32B.) Reference Site: PB DS 02 MD Reference: 2-328:@ 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Offset Design PB DS 02- 02-13-02-13B-02-13B Offset Site Error: 0.00 usft Survey Program: 100-GYD-CT-CMS,9100-GYD-CT-CMS,9891-MWD+IFR+MS-WOCA Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) P) (usft) (usft) (in) (use) (usft) (usft) 12,785.36 8,979.38 11,000.00 8,986.00 86.73 19.88 77.23 -790.96 1,362.65 4.312 389.19 334.33 62.62 Pass-Major Risk,CC,ES,SF 12,811.28 8,979.75 10,900.00 8,990.91 86.85 19.72 79.95 -823.83 1,456.97 4.312 476.14 331.97 144.17 Pass-Major Risk 12,833.43 8,980.06 10,800.00 8,994.70 86.96 19.50 82.45 -858.11 1,550.83 4.312 564.80 332.70 232.09 Pass-Major Risk 12,850.00 8,980.28 10,700.00 8,997.39 87.04 19.29 84.42 -891.92 1,644.88 4.312 855.55 332.83 322.59 Pass-Major Risk 12,864.31 8,980.48 10,600.00 8,991.09 87.11 19.11 86.80 -917.39 1,741.32 4.312 750.27 332.85 417.33 Pass-Major Risk 12,875.00 8,980.62 10,500.00 8,982.48 87.16 18.95 88.76 -939.35 1,838.49 4.312 846.60 332.73 513.86 Pass-Major Risk CC-Min centre to center distance or covergent point.SF-min separation factor.ES-min ellipse separation 8/1/2014 11:23:13AM Page 19 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B.) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Offset Design PB DS 02- 02-31-02-31-02-31 Offset Site Error: 0.00 usft Survey Program: 100-BOSS-GYRO Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/...S +E/-W Hole Size Centre Distance Deviation (usft( (usft( (usft) (usft( (usft( (usft( Pl (usft) (usft) (in) (usft) (usft( (usft) 12,200.00 8,969.09 8,400.00 8,128.00 84.48 55.40 121.19 -237.75 2,087.53 7.750 1,473.05 341.00 1,186.87 Pass-Major Risk 12,200.00 8,969.09 8,500.00 8,214.44 84.48 57.93 117.30 -235.68 2,137.76 5.562 1,467.41 341.21 1,170.28 Pass-Major Risk,CC 12,200.00 8,969.09 8,600.00 8,300.21 84.48 60.54 113.40 -233.73 2,189.14 5.562 1,469.89 341.41 1,163.02 Pass-Major Risk,ES,SF 12,200.00 8,969.09 8,700.00 8,384.88 84.48 63.29 109.55 -232.12 2,242.31 5.562 1,481.20 341.60 1,165.93 Pass-Major Risk CC-Min centre to center distance or covergent point.SF-min separation factor,ES-min ellipse separation 8/1/2014 11:23:13AM Page 20 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-328:@ 56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-320:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Offset Design PB DS 02 02-31-02-31A-02-31A Offset Site Error: 0.00 usft Survey Program: 100-BOSS-GYRO,9068-MWD,9097-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/-S +E/-W Hole Size Centre Distance Deviation (usft) (use) (usft) (usft) (usft) (usft) Ii (usft) (usft) (in) (usft) (usft) (usft) 11,375.00 8,951.04 11,220.00 8,946.62 82.47 75.24 62.66 614.00 1,007.44 3.500 237.44 345.54 -102.67 FAIL-Major Risk,CC,ES,SF 11,390.53 8,951.18 11,200.00 8,945.67 82.50 75.19 64.65 601.79 1,023.25 3.500 245.04 341.45 -93.81 FAIL-Major Risk 11,450.00 8,951.84 11,100.00 8,944.08 82.62 74.86 71.57 543.10 1,104.11 3.500 292.28 334.32 -39.88 FAIL-Major Risk 11,491.36 8,952.42 11,000.00 8,950.46 82.70 74.51 74.93 495.53 1,191.67 3.500 358.15 331.11 29.95 Pass-Major Risk I 11,525.00 8,952.97 10,900.00 8,955.37 82.78 74.14 77.98 463.22 1,286.02 3.500 440.47 331.13 113.03 Pass-Major Risk 11,539.09 8,953.21 10,800.00 8,958.14 82.81 73.78 79.21 449.81 1,384.89 3.500 534.03 331.88 206.31 Pass-Major Risk 11,550.00 8,953.41 10,700.00 8,963.73 82.83 73.44 79.91 449.42 1,484.67 3.500 631.89 333.10 303.19 Pass-Major Risk 11,562.13 8,953.64 10,600.00 8,966.86 82.86 73.15 81.13 430.97 1,582.73 3.500 725.52 334.76 395.59 Pass-Major Risk 11,575.00 8,953.89 10,500.00 8,959.12 82.89 72.91 83.27 398.95 1,676.97 3.500 814.68 336.92 482.95 Pass-Major Risk 11,600.00 8,954.39 10,400.00 8,947.83 82.95 72.71 86.96 353.04 1,764.98 3.500 898.01 343.38 560.30 Pass-Major Risk 11,625.00 8,954.93 10,300.00 8,939.98 83.01 72.57 90.35 293.99 1,845.25 3.500 975.23 351.01 630.40 Pass-Major Risk 11,640.12 8,955.27 10,200.00 8,931.66 83.04 72.44 92.55 230.75 1,922.25 3.500 1,051.81 355.87 702.59 Pass-Major Risk 11,650.00 8,955.50 10,100.00 8,932.37 83.07 72.32 93.59 173.78 2,004.22 3.500 1,135.43 359.22 783.28 Pass-Major Risk 11,675.00 8,956.09 9,800.00 8,941.50 83.13 72.03 95.88 76.56 2,285.95 3.500 1,422.87 368.33 1,062.35 Pass-Major Risk 11,675.00 8,956.09 9,900.00 8,939.67 83.13 72.11 96.03 96.70 2,188.15 3.500 1,323.73 368.22 963.13 Pass-Major Risk 11,675.00 8,956.09 10,000.00 8,935.27 83.13 72.21 96.30 129.91 2,093.97 3.500 1,227.47 368.15 866.69 Pass-Major Risk 12,200.00 8,969.09 8,400.00 8,128.00 84.48 55.40 121.19 -237.75 2,087.53 7.750 1,473.05 341.00 1,186.87 Pass-Major Risk 12,200.00 8,969.09 8,500.00 8,214.44 84.48 57.93 117.30 -235.68 2,137.76 5.562 1,467.41 341.21 1,170.28 Pass-Major Risk 12,200.00 8,969.09 8,600.00 8,300.21 84.48 60.54 113.40 -233.73 2,189.14 5.562 1,469.89 341.41 1,163.02 Pass-Major Risk 12,200.00 8,969.09 8,700.00 8,384.88 84.48 63.29 109.55 -232.12 2,242.31 5.562 1,481.20 341.60 1,165.93 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/1/2014 11:23:13AM Page 21 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-328:) Reference Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Offset Design PB DS 02- 02-31-02-31APB1-02-31APB1 Offset Site Error: 0.00 usft Survey Program: 100-BOSS-GYRO,9068-M1ND Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +EI-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (in) (usft) (usft) (usft) 12,200.00 8,969.09 8,400.00 8,128.00 84.48 55.40 121.19 -237.75 2,087.53 5.687 1,473.05 340.83 1,187.04 Pass-Major Risk 12,200.00 8,969.09 8,500.00 8,214.44 84.48 57.93 117.30 -235.68 2,137.76 3.500 1,467.41 341.04 1,170.45 Pass-Major Risk,CC 12,200.00 8,969.09 8,600.00 8,300.21 84.48 60.54 113.40 -233.73 2,189.14 3.500 1,469.89 341.24 1,163.19 Pass-Major Risk,ES,SF 12,200,00 8,969.09 8,700.00 8,384.88 84.48 63.29 109.55 -232.12 2,242.31 3.500 1,481,20 341,43 1,166.10 Pass-Major Risk CC-Min centre to center distance or covergent point.SF-min separation factor,ES-min ellipse separation 8/1/2014 11:23:13AM Page 22 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:©56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Offset Design PB DS 02- 02-32-02-32-02-32 Offset Site Error: 0.00 usft Survey Program: 200-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/-6 +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (soft) (usft) (usft) P) (usft) (usft) (in) (usft) (usft) (usft) 9,875.00 8,921.98 10,400.00 8,903.62 81.57 33.54 1.05 2,464.94 36.75 5.562 825.73 76.03 753.95 Pass-Major Risk 9,875.00 8,921.98 10,500.00 8,898.79 81.57 34.76 1.09 2,564.48 28.45 5.562 925.41 76.26 853.67 Pass-Major Risk 9,875.00 8,921.98 10,600.00 8,895.90 81.57 35.94 1.01 2,664.00 19.17 5.562 1,025.09 76.50 953.38 Pass-Major Risk 9,875.00 8,921.98 10,700.00 8,893.73 81.57 37.23 0.91 2,763.59 10.39 5.562 1,124.85 76.78 1,053.18 Pass-Major Risk 9,875.00 8,921.98 10,800.00 8,891.07 81.57 38.51 0.84 2,863.14 1.29 5.562 1,224.64 77.14 1,152.99 Pass-Major Risk 9,875.00 8,921.98 10,900.00 8,888.76 81.57 39.33 0.77 2,962.73 -7.48 5.562 1,324.47 80.92 1,247.13 Pass-Major Risk 9,875.00 8,921.98 10,937.00 8,887.92 81.57 39.55 0.75 2,999.58 -10.70 5.562 1,361.41 86.12 1,279.17 Pass-Major Risk 9,883.32 8,922.46 10,300.00 8,908.81 81.57 32.27 1.91 2,365.42 44.89 5.562 726.00 73.01 657.73 Pass-Major Risk 9,886.21 8,922.63 10,200.00 8,915.56 81.57 31.24 1.98 2,265.86 51.43 5.562 626.29 71.92 559.14 Pass-Major Risk 9,889.81 8,922.84 10,100.00 8,923.70 81.57 30.26 1.89 2,166.42 58.20 5.582 526.73 70.71 460.93 Pass-Major Risk 9,900.00 8,923.43 9,900.00 8,939.19 81.57 27.75 1.26 1,967.52 71.29 5.562 328.03 68.97 265.51 Pass-Major Risk 9,900.00 8,923.43 10,000.00 8,933.06 81.57 29.23 2.14 2,067.09 64.98 5.562 427.48 69.73 364.76 Pass-Major Risk 9,904.78 8,923.70 9,800.00 8,935.29 81.57 26.25 2.63 1,867.77 76.41 5.562 228.52 68.77 166.79 Pass-Major Risk 9,909.36 8,923.96 9,700.00 8,921.04 81.57 24.75 9.72 1,768.86 78.87 5.562 130.75 68.68 68.06 Pass-Major Risk 9,913.44 8,924.19 9,600.00 8,899.53 81.57 23.30 52.36 1,671.23 79.37 5.562 49.27 68.63 -18.17 FAIL-Major Risk,CC,ES,SF 9,917.07 8,924.40 9,500.00 8,869.74 81.57 21.86 137.00 1,575.83 78.41 5.562 91.98 68.46 36.41 Pass-Major Risk 9,920.12 8,924.57 9,400.00 8,829.62 81.57 20.47 149.39 1,484.31 76.48 5.562 188.01 68.24 136.15 Pass-Major Risk 9,925.53 8,924.87 9,300.00 8,782.98 81.57 19.39 152.40 1,395.87 75.11 5.562 287.48 68.88 237.90 Pass-Major Risk 9,944.98 8,925.93 9,200.00 8,738.72 81.57 18.45 156.14 1,306.21 75.55 5.562 386.81 74.42 338.88 Pass-Major Risk 11,250.00 8,949.98 7,800.00 7,727.29 81.81 5.37 -166.41 388.78 42.30 9.062 1,440.28 283.56 1,280.10 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor.ES-min ellipse separation 8/1/2014 11:23:13AM Page 23 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-328:©56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-32B:i 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Offset Design PB DS 02- 02-32-02-32A-02-32A Offset Site Error. 0.00 usft Survey Program: 200-MWD,8975-MWD,9077-MWD,9265-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (in) (usft) (usft) (usft) 9,251.34 8,842.06 9,300.00 8,868.74 7.17 17.26 84.53 1,284.75 12.06 6.875 328.40 101.21 227.20 Pass-Major Risk 9,326.70 8,866.22 9,400.00 8,923.48 30.17 17.56 97.93 1,315.02 -65.68 6.875 258.91 172.65 88.89 Pass-Major Risk 9,449.13 8,885.05 9,500.00 8,941.38 76.41 18.16 124.52 1,369.50 -145.54 6.875 176.80 299.53 -110.70 FAIL-Major Risk 9,511.03 8,893.35 9,600.00 8,935.46 81.40 19.01 143.23 1,443.22 -212.62 8.875 84.42 290.76 -182.32 FAIL-Major Risk,ES,SF 9,545.32 8,897.52 9,700.00 8,931.33 81.42 20.02 -104.81 1,524.27 -270.90 6.875 26.60 272.08 -161.23 FAIL-Major Risk,CC 9,575.00 8,900.81 9,800.00 8,933.23 81.44 21.16 -55.21 1,614.48 -313.52 6.875 109.64 253.19 -141.39 FAIL-Major Risk 9,608.43 8,904.13 9,900.00 8,926.89 81.46 22.35 -41.12 1,712.16 -332.69 6.875 194.11 229.00 -33.48 FAIL-Major Risk 9,639.68 8,906.82 10,000.00 8,925.10 81.48 23.54 -33.05 1,811.95 -332.74 6.875 275.77 204.16 73.25 Pass-Major Risk 9,670.00 8,909.02 10,100.00 8,922.80 81.50 24.65 -26.04 1,910.45 -316.56 6.875 354.20 177.86 177.48 Pass-Major Risk 9,700.00 8,910.99 10,200.00 8,921.38 81.52 25.68 -21.82 2,005.03 -284.37 6.875 427.98 163.16 266.33 Pass-Major Risk 9,736.24 8,913.34 10,300.00 8,933.44 81.53 26.64 -18.70 2,099.73 -254.94 6.875 507.27 144.02 364.64 Pass-Major Risk 9,740.26 8,913.60 10,760.00 8,930.82 81.53 31.95 -17.64 2,520.70 -377.56 6.875 945.56 151.34 794.36 Pass-Major Risk 9,750.00 8,914.23 10,400.00 8,937.97 81.54 27.72 -17.19 2,198.62 -242.73 6.875 598.55 137.06 463.04 Pass-Major Risk 9,750.00 8,914.23 10,700.00 8,933.19 81.54 31.39 -16.61 2,475.62 -338.04 6.875 890.98 137.01 755.92 Pass-Major Risk 9,759.57 8,914.85 10,600.00 8,937.02 81.54 30.16 -15.73 2,392.11 -283.74 6.875 795.91 131.93 665.86 Pass-Major Risk 9,762.64 8,915.04 10,500.00 8,940.48 81.54 28.91 -15.73 2,297.90 -250.87 6.875 696.49 130.19 567.97 Pass-Major Risk 11,250.00 8,949.98 7,800.00 7,727.29 81.81 5.37 -166.41 388.78 42.30 9.062 1,440.28 283.57 1,280.10 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/1/2014 11 23 13AM Page 24 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Offset Design PB DS 02- 02-32-02-32APB1-02-32APB1 Offset Site Error: 0.00 usft Survey Program: 200-MWD,9000-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +E/-W Hole Size Centre Distance Deviation (soft) (usft) (usft) (usft) (usft) (usft) (') (usft) (usft) (in) (usft) (usft) (usft) 9,235.34 8,835.89 9,300.00 8,895.69 6.11 17.01 90.18 1,259.44 28.36 6.875 344.33 96.91 247.94 Pass-Major Risk 9,325.68 8,865.99 9,400.00 8,957.77 29.79 17.52 103.36 1,307.86 -31.74 6.875 299.66 171.26 134.20 Pass-Major Risk 9,508.97 8,893.09 9,453.00 8,978.49 81.40 17.85 138.03 1,342.95 -65.63 6.875 267.05 299.67 -8.20 FAIL-Major Risk,CC,ES,SF 11,250.00 8,949.98 7,800.00 7,727.29 81.81 5.37 -166.41 388.78 42.30 9.062 1,440.28 283.57 1,280.10 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/1/2014 11:23:13AM Page 25 COMPASS 5000.1 Build 61 • BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:©56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset ND Reference: Offset Datum Offset Design PB DS 02- 02-32-02-32APB2-02-32APB2 Offset Site Error: 0.00 usft Survey Program: 200-MWD,9000-MWD,9077-MWD Rule Assigned:Mayor Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +E/AN Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (in) (usft) (usft) (usft) 9259.97 8,845.36 9,300.00 8,870.53 7.74 17.35 84.32 1,293.57 17.99 6.875 335.45 103.29 232.15 Pass-Major Risk 9,547.64 8,897.79 9,400.00 8,913.33 81.42 17.92 130.48 1,348.88 -53.22 6.875 283.97 270.40 -5.40 FAIL-Major Risk 9,572.60 8,900.56 9,500.00 8,941.47 81.44 18.68 144.47 1,415.72 -121.84 6.875 170.70 254.47 -76.39 FAIL-Major Risk 9,585.85 8,901.94 9,800.00 8,951,09 81.45 19.61 165.46 1,491.90 -185.41 6.875 78.65 245.41 -131.71 FAIL-Major Risk 9,610.30 8,904.31 9,700.00 8,944.56 81.46 20.71 -83.77 1,580.99 -229.49 6.875 38.82 227.46 -141.40 FAIL-Major Risk,CC,ES,SF 9,638.98 8,906.77 9,800.00 8,933.44 81.48 21.88 -38.84 1,677.64 -251.33 8.875 119.53 204.65 -84.04 FAIL-Major Risk 9,660.86 8,908.40 9,900.00 8,924.05 81.50 23.06 -28.49 1,775.64 -266.82 6.875 211.46 186.20 26.79 Pass-Major Risk 9,670.00 8,909.02 9,955.00 8,913.80 81.50 23.46 -24.26 1,827.35 -282.51 6.875 264.77 187.40 77.90 Pass-Major Risk 11,250.00 8,949.98 7,800.00 7,727.29 81.81 5.37 -166.41 388.78 42.30 9.062 1,440.28 283.57 1,280.10 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/1/2014 11:23:13AM Page 26 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report Company: NorthAmerica-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-32B:©56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Offset Design PB DS 02- 02-32-02-32APB3-02-32APB3 Offset Site Error: 0.00 usft Survey Program: 200-MWD,8975-MWD,9077-MWD,9344-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/-S +El-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) loon) (1 (usft) (usft) (in) (usft) (usft) (usft) 9259.97 8,845.36 9,300.00 8,870.53 7.74 17.35 84.32 1,293.57 17.99 6.875 335.45 103.29 232.15 Pass-Major Risk 9,526.02 8,895.22 9,400.00 8,908.57 81.41 17.90 125.67 1,348.88 -55.36 6.875 262.24 282.80 -19.81 FAIL-Major Risk 9,538.60 8,896.73 9,500.00 8,922.70 81.42 18.55 132.77 1,409.30 -133.65 6.875 163.94 275.86 -108.68 FAIL-Major Risk 9,556.70 8,898.82 9,600.00 8,936.39 81.43 19.38 152.92 1,479.66 -203.23 6.875 69.73 264.99 -171.17 FAIL-Major Risk 9,571.14 8,900.40 9,700.00 8,939.32 81.44 20.36 -83.80 1,557.04 -266.21 6.875 43.03 255.69 -175.52 FAIL-Major Risk,CC,ES,SF 9,587.47 8,902.10 9,800.00 8,931.05 81.45 21.46 -49.49 1,642.23 -317.43 6.875 131.64 244.47 -111.48 FAIL-Major Risk 9,610.92 8,904.36 9,900.00 8,926.00 81.47 22.62 -39.94 1,737.51 -346.80 6.875 222.69 226.03 -3.04 FAIL-Major Risk 9,625.00 8,905.61 9,938.00 8,924.14 81.47 22.86 -36.33 1,774.56 -355.01 6.875 257.30 224.11 33.47 Pass-Major Risk 11,250.00 8,949.98 7,800.00 7,727.29 81.81 5.37 -166.41 388.78 42.30 9.062 1,440.28 283.57 1,280.10 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/1/2014 11:23:13AM Page 27 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Offset Design PB DS 02- 02-32-02-32B-02-32B Offset Site Error. 0.00 usft Survey Program: 188-MWD,6621-MWD+IFR+MS-WOCA Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°I (usft) (usft) (in) (usft) (usft) (usft) 9,299.97 8,859.28 9,300.00 8,859.82 14.57 0.37 -140.92 1,288.91 -319.57 4.312 0.79 45.85 -31.64 FAIL-Major Risk,CC 9,395.79 8,877.34 9,400.00 8,890.23 50.71 0.95 -122.63 1,383.28 -332.21 4.312 19.54 154.38 -98.78 FAIL-Major Risk 9,475.00 8,888.63 9,500.00 8,909.17 75.86 1.53 -84.93 1,480.51 -345.31 4.312 59.52 220.92 -151.45 FAIL-Major Risk,ES,SF 9,537.40 8,896.59 9,600.00 8,916.83 75.90 2.10 -62.18 1,579.61 -355.80 4.312 118.32 200.61 -81.11 FAIL-Major Risk 9,580.64 8,901.40 9,700.00 8,918.19 75.93 2.61 -48.65 1,679.05 -366.25 4.312 191.59 180.94 11.07 Pass-Major Risk 9,612.40 8,904.50 9,800.00 8,920.12 75.95 3.02 -40.55 1,778.60 -375.47 4.312 273.00 163.72 110.00 Pass-Major Risk 9,635.96 8,906.53 9,900.00 8,922.79 75.97 3.46 -35.16 1,878.13 -384.65 4.312 359.76 149.32 211.06 Pass-Major Risk 9,650.00 8,907.62 10,000.00 8,923.22 75.97 3.98 -31.67 1,977.72 -393.21 4.312 449.61 140.78 309.73 Pass-Major Risk 9,670.00 8,909.02 10,100.00 8,920.69 75.99 4.39 -27.07 2,077.38 -400.95 4.312 541.36 127.38 415.16 Pass-Major Risk 9,683.36 8,909.90 10,200.00 8,918.90 75.99 4.87 -25.00 2,177.03 -409.07 4.312 634.95 122.34 514.14 Pass-Major Risk 9,700.00 8,910.99 10,300.00 8,916.36 76.00 5.37 -22.66 2,276.66 -417.24 4.312 729.61 115.68 615.83 Pass-Major Risk 9,700.00 8,910.99 10,400.00 8,915.54 76.00 5.76 -22.41 2,376.33 -425.29 4.312 825.14 116.14 711.09 Pass-Major Risk 9,725.00 8,912.62 10,500.00 8,914.69 76.02 6.26 -19.40 2,475.95 -433.96 4.312 921.38 105.35 818.51 Pass-Major Risk 9,725.00 8,912.62 10,600.00 8,915.03 76.02 6.65 -19.31 2,575.58 -442.58 4.312 1,018.03 105.76 914.91 Pass-Major Risk 9,725.00 8,912.62 10,700.00 8,915.00 76.02 7.19 -19.22 2,675.16 -451.75 4.312 1,115.39 106.26 1,011.92 Pass-Major Risk 9,738.79 8,913.51 10,800.00 8,913.77 76.02 7.62 -17.54 2,774.62 -462.01 4.312 1,213.11 108.68 1,105.54 Pass-Major Risk 9,738.84 8,913.51 10,801.00 8,913.75 76.02 7.62 -17.53 2,775.61 -462.12 4.312 1,214.09 109.09 1,106.19 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 811/2014 11.23:13AM Page 28 COMPASS 5000.1 Build 61 • • BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:@ 56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-328:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Offset Design PB DS 02- 02-33-02-33-02-33 Offset Site Error. 0.00 ustt Survey Program: 100-BOSS-GYRO Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +WS +El-W Hole Size Centre Distance Deviation (soft) (usft) (ustt) (ustt) (usft) (use) P) (usft) (ustt) (in) (ustt) (usft) (ustt) 11,900.00 8,962.07 8,600.00 8440.30 83.58 37.48 -113.20 -41.81 -372.66 5.562 1,317.92 374.55 974.54 Pass-Major Risk,CC,ES,SF 11,925.00 8,962.72 8,400.00 8,263.79 83.64 32.65 -123.91 -119.13 -319.49 7.750 1,355.64 365.92 1,040.59 Pass-Major Risk 11,925.00 8,962.72 8,500.00 8,353.19 83.64 34.92 -120.05 -82.57 -345.28 5.562 1,332.16 371.52 1,001.52 Pass-Major Risk 11,938.00 8,963.06 8,300.00 8,171.53 83.67 30.83 -129.18 -149.46 -295.72 7.750 1,388.52 362.76 1,087.66 Pass-Major Risk 11,950.00 8,963.37 8,100.00 7,987.38 83.70 27.27 -137.59 -207.09 -243.23 7.750 1,467.93 355.37 1,196.67 Pass-Major Risk 11,950.00 8,963.37 8,200.00 8,078.90 83.70 29.16 -134.17 -177.77 -270.87 7.750 1,426.75 359.79 1,140.14 Pass-Major Risk CC-Min centre to center distance or covergent point;SF-min separation factor,ES-min ellipse separation 8/1/2014 11:23:13AM Page 29 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:©56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-328:@ 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Offset Design PB DS 02- 02-33-02-33A-02-33A Offset Site Error: 0.00 usft Survey Program: 100-BOSS-GYRO,9115-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +(s1/-S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) ("1 (usft) (usft) (in) (usft) (usft) (usft) 10,757.00 8,945.01 10,800.00 8,945.51 81.90 51.40 -103.41 991.62 210.38 3.500 425.29 412.09 15.05 Pass-Major Risk 10,775.00 8,945.21 10,872.00 8,945.56 81.90 51.50 -105.80 963.87 276.67 3.500 367.46 422.68 -42.47 FAIL-Major Risk,CC,ES,SF 11,900.00 8,962.07 8,600.00 8,440.30 83.58 37.48 -113.20 -41.81 -372.66 3.500 1,317.92 374.38 974.71 Pass-Major Risk 11,925.00 8,962.72 8,400.00 8,263.79 83.64 32.65 -123.91 -119.13 -319.49 5.687 1,355.64 365.75 1,040.77 Pass-Major Risk 11,925.00 8,962.72 8,500.00 8,353.19 83.64 34.92 -120.05 -82.57 -345.28 3.500 1,332.16 371.35 1,001.69 Pass-Major Risk 11,938.00 8,963.06 8,300.00 8,171.53 83.67 30.83 -129.18 -149.46 -295.72 5.687 1,388.52 362.59 1,087.83 Pass-Major Risk 11,950.00 8,963.37 8,100.00 7,987.38 83.70 27.27 -137.59 -207.09 -243.23 5.687 1,467.93 355.20 1,196.84 Pass-Major Risk 11,950.00 8,963.37 8,200.00 8,078.90 83.70 29.16 -134.17 -177.77 -270.87 5.687 1,426.75 359.61 1,140.32 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/1/2014 11:23:13AM Page 30 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:©56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Reference Depths are relative to 2-32B:©56.60usft(2-32B:) Coordinates are relative to:02-32 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927(Exact solution),Alaska Zone 04 Central Meridian is 150°0'0.00 W Grid Convergence at Surface is:1.43° Ladder Plot 1600— I 1 • I 1 , I I I _ ._. -I__ ... _I _I _ _ I I1 1200— — 0 i c 0 I iI 2 ca d J J -_F - J I , m800— — —_�_ _ 1111!, I 0 o 2 I , I c c..) ;_ N 1 � 400— — 1i I I I I 0 I I I 1 1 - 0 2500 5000 7500 10000 12500 15000 Measured Depth LEGEND -e- 02-01,02-01,02-01 V2 4(- 02-09,02-09D,02-09D VO -4-- 02-32,02-32,02-32 V12 $- 02-01A,02-01A,02-01A V1 -e- 02-10,02-10,02-10 V3 -34- 02-32,0232A,0232AV4 -S- 02-01A 02-01 B,02-01B VO -et-- 02-10,02-10A 02-10A V3 0232,0232APB 1,0232APB1 V2 - 02-01A,02-01C,02-01 C VO -)e- 02-i0,02-1 OAPB1,02-10APB1 V3 -8- 02-32,02-32APB2,0232APB2 V2 4r- 02-01 A,02-01 C,Copy of02-01 C Plan 2 VO —0- 02-10,02-10B,02-10B V2 -a- 02-32,0232APB3,0232APB3 V2 - 02-08,02-08,02-08 V3 -9- 02-13,02-13B,02-13B V16 -4- 02-32,02-3213,02-3213V16 e- 02-08,02-08A,02-08A V2 -fr- 02-31,02-31,02-31 V9 $ 02-33,02-33,02-33 V4 -S-- 02-08,02-08APB1,02-08APB1 V 1 - f 02-31,02-31A,0231 A V 1 -$- 02-33,02-33A,0233A V4 • •:,• 6:7,1 P::. U2-dl,U2-il AVM,U2-i1HNti I Vi CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/1/2014 11.23:13AM Page 31 COMPASS 5000.1 Build 61 Y BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay ND Reference: 2-32B:@ 56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-32B:@ 56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset ND Reference: Offset Datum Reference Depths are relative to 2-32B:@ 56.60usft(2-32B:) Coordinates are relative to:02-32 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927(Exact solution),Alaska Zone 04 Central Meridian is 150°0'0.00 W Grid Convergence at Surface is:1.43° - Separation Factor Plot 9.00_. -.. -_-- t 6.00- U- m 3.00- i 11 I ` � tl i 0.00 I I I I 0 2500 5000 7500 10000 12500 Measued Depth LEGEND -9- 02-01,02-01,02-01 V2 4E- 02-09,02-09D,02-09D VO -6- 0232,02-32,02-32 V12 02-01A,02-01A,02-01AV1 -e- 02-10,02-10,02-10 V3 - 02-32,02-32A,02-32AV4 02-01A,02-016,02-01BVO - ,r 02-10,02-10A02-10AV3 0232,02-32APB1,0232APB1 V2 02-01 A,02-01 C,02-01 C V0 -3*- 02-10,02-10APB1,02-10APB1 V3 -9- 0232,0232APB2,0232APB2 V2 02-01A,02-01 C,Copy of02-01 C Plan 2 V0 02-10,02-1013,02-10B V2 -b- 0232,0232APB3,0232APB3 V2 02-08,02-08,02-08 V3 $- 02-13,02-13B,02-138 V16 -0- 02-32,02-32B,02-3213V16 02-08,02-08A,02-08A V2 -6. 02-31,02-31,0231 V9 -0- 02-33,02-33,02-33 V4 02-08,02-08APB1,02-08APB1 V1 -XF 02-31,02-31A 0231 A V1 -e- 02-33,02-33A 0233A V4 -027313,1327356,132711313V2--- U2-i1,UL-i1H1-'tl1,U1,31HNt31 Vi CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/1/2014 11:23:13AM Page 32 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 02-32 Project: Prudhoe Bay TVD Reference: 2-32B:©56.60usft(2-32B:) Reference Site: PB DS 02 MD Reference: 2-32B:©56.60usft(2-32B:) Site Error: 0.00 usft North Reference: True Reference Well: 02-32 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 02-32C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan 6 Offset TVD Reference: Offset Datum Reference Depths are relative to 2-328:@ 56.60usft(2-32B) Coordinates are relative to:02-32 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927(Exact solution),Alaska Zone 04 Central Meridian is 150°0'0.00 W Grid Convergence at Surface is:1.43° Travelling Cylinder Plot 2100 330 j 30 1800 1500 300 ,, 1200 111 9875 1111 ---_,,...,,,,,N.‘-' 1600 N 18. 8 300 10575, 270 t :e1 i\,,,' ',.' ,,\J 11675 90 fit:,, � � 240 A� 1 ' 116 1 120 71261 --= 11450 N 1102:/ .1800 ---- 210 ��150 2100 180 Azimuth from North[O]vs Centre to Centre Separation[1000 usft/in] LEGEND -4 -- 02-01,02-01,02-01 V2 -f 02-09,02-09D,02-09DVO -1- 02-32,02-32,02-32 V12 02-01A,02-01A,02-01A V1 -e- 02-10,02-10,02-10 V3 -F 02-32,02-32A,02-32A V4 -*- 02-01A,02-01 B,02-01B VO 02-10,02-10A,02-10A V3 02-32,0232APB1,02-32APB1 V2 02-01A,02-01C,02-01C VO -X- 02-10,02-10APB1,02-10APB1 V3 -9- 02-32,02-32APB2,02-32APB2 V2 02-01A,02-01C,Copy of02-01 C Plan 2 VO -9- 02-10,02-1013,02-10B V2 -rte- 02-32,0232APB3,02-32APB3 V2 02-08,02-08,02-08 V3 -9. 02-13,02-13B,02-13B V16 $ 0232,02326,02326 V16 -e- 02-08,02-08A,02-08AV2 -r- 02-31,02-31,02-31 V9 $ 02-33,02-33,02-33 V4 02-08,02-08APB1,02-08APB1 V1 -E- 02-31,02-31A,02-31A V1 -e- 0233,0233A,0233A V4 CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/1/2014 11:23:13AM Page 33 COMPASS 5000.1 Build 61 OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. I , rt r WEI& NAME: , 0 Z - Z- - cc-iv ce Ex!'aicry _StratigrSphlic. Test _ Ron-CorwEr'tior,ci 7[= 14/C✓i (-1?-1.4—e-aP Y-1 / C;acci:in•oz:for Appropriate Letter/ Paragraphs to ue included in 1'ransrnlitei Letter C :ECK OPTIONS TEXT FOR APPROVAL LETTER MULTI LATERAL The permit is for a new wellbore segment of existing well Permit (If last two digits No. , API No. 50- - - - in API number are Production should continue to be reported as a function of the original between 60-69) API number stated above. In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name Pilot Hole ( PH) and API number (50- - - - ) from records, data and logs acquired for well(name on permit). The permit is approved subject to full compliance with 20 MC 25.055. Approval to produce / inject is contingent upon issuance of a Spacing Exception conservation order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10'sample intervals through target zones. Please note the following special condition of this permit: Production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 MC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application,the following well logs are Well Lo ,n also required for this well: gg g Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 MC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 4/2014 7 To U) • U) co _ -5 0 To _ 1 N 4 . Q a). t •U) 4 O co T O aY o a W N m c'', o w D 0 " v cE O ca0 . U0 0° a 0 3 '0,U O d T '� N o y, .0 0. COO. = O 0 (o m 3 �o a) c, 3 0 m • c ui co C o �. a a c0`o, a N 7 O .0 �. W. a p �, N' CO, N . E _c 2. N, O ^ ' O, N, 0 O O a) O. _ N E, lD J a) a), C co cocoN, a) W ru ' N 0 0) 'di a P. Oi 6. w O w a) CNI01 >, y @ a ao, 3 a O O = 0 w N m. w E. 3 OE N co, CO, 0: 2 W N O d -O 0 - co U M Q. 0, a). W o cC ~ O m '_c O a) a)i. v L. y, .co m 7 U), t, c o W U o N N _o Y C >n a) ._ 0- N O Q. a) 0 > N _ c 0 CO = C , CO, 7 Q _� 'a), < < 0 Cl) 0) O) 3 as �, C DI 0 U) 3, N O C m CC N u) N .N N a) N C' Cl) O 8 CU 7, co o a) O c o (0) (o) c ) N' N E 0 m' y E. 0 C9 3 = -0 a) a) o' 3 v. Z N 0 7 0. 0. a) N: U O d E N, C, . a) D ...= � 0 (`� C C � 't 03 cd a L 0' .- x U) . U) O C: Z C � 0 Cl) 0 O, O @. O) F- C, 0 d ' N' U), a) w W a O o O co u) 1- ix d Q' , 2' D' a W 0 , U) U) U) V) V) U) CO CO CO CO U) U) CO N CO CO U) CO CO CO CO U)' U) U) < a> 0 a) a) a) a) a) a) a) a) a) 0 0 < < < < < < Q a) a) a) a) o < a) a), 0. a) a), 0, < o a) < Q < az > z >- > > > > > > } > } >- zzz zzzz >- >- >- } } z > > } } } } z zrzzz x >' N o CO v a — U w O Cckl TO a) a) P E 3 - E a) O U U Z S a) * 0 IE O o c t o E h cm 1 ° o : 0 Q o „a) 3 E _ 3: o m O 0 C C U C --- c U 0 00 To N O. G N d �, O, O W, = 7 O T LL C J �, N. co, a C, _° N N N D v m o Q y uJ @ a 0 •y 7., w �. C0 0 60) a 0 o q ° w Ls.- CO O yi 0 7 aa) as N > 3 us D v o O a0, E a) 0 •0 o ch' "o O 3 u w, , ar w - •O o 0) -O o a> 'c 7. a) 0 O. - D o, c a> CO, � o, 0, 0) N u? L.. Q j co co' C N 57 Q m rn as > o > o, o �' a N E c o, o, 0)c O Y E E = -° c c E @ o M c c n, H c o ata' t?' �' c a) �, a a N c d c c 2 0 0 0 h u m c Q o o, rn m, (j 'a o m, O, y, d, ° a ;' o, >, m 0 >` o"y y 0 co la O N N C C C _ _ O y O O O C, �, o 'O 0, a), C. a) 6 (6, Q, s,, 2, 0 a, O: O) 0,, ay a) W CC J E a U U a) r a o 0 0 c - d Z' o' E �' 3 a) o' TY r m' 3' a) -rn E n Q 7 ... m m@ m 0 0 t t _0 0 0 v' 0) 0 m c 0• m M 1O •-CO t o 0 a a 3 _o' •C o c E go o z a -° �c2 c ) s v_) 'm 0 -o c 3 3 > 0 i,• o :o ). ° w o 0 m v 0 o m a s 5. m. o, 3 o L, Z w w 0 o O o C w a 'O > O a) .a v v O a) -EC O a).. o o,, c o. N, 'O 0, (o O. CO C� •6: a U): >' a) d F- 0 a a) -0 a`) 0 13 o U O` 0 0 0. C v U U a l a) Y. 0 0 ,- d' V m' E rn o.. ,.t.I. vo 7. C, �O' et) Q L a O 0. 0. O O a co 0 O_ L N. 0- C 0) a)' 0, c, U 3 N, •�' N 0 co, 0 •6 Q' U a3 E co O O O N a Ul Vl a). C U) 0) a) aS a), 0 O O1 >. • _' N' V: .N: O, d a} 3 0 N a) ` O 7' 7' a y d' O' 0 N' -o' C N O a) C G a a V) T UI d 3 t -O C m, >, C L, a) 0, a .0 N, .O U o OU �, "' >+ .O a) LL a n - a°i m o r c c °' '3 aci w • �, m m $ �' '�' = 3' �', °' o, �, o. �, c, aci c. c E' X E a) a a) a) E m o U 0' t? 0 .0 0 CO' c, .2: 0, �p co c c°)', c F W 442; 3 U U U O o U .U.. a) U U) �O c U 8.' O. -6> _, 7 (0 .o l6 C 73; = U% 0' E' a) 'C U' N U, V, d a) O O O ..6,° .> N N a O N a 0 > > 3 �, a) W. W Y �[ 0 . '=' a E: O N Cl) Y m aa) co m m a) 0 -00 a s aa) aa) co o m o o m; 2 M M m v 0 -o - O O t w aa)) € co a: a0), c m U@ a J D 5 5 CO "= O O a a 0 5 a a` z o cn c o c o a ., d, y- o m m o s a q Ca U) U, � ° W Cl p N M V u7 O h CO 0) O N (�') )[) CO O 0) O ,- N M .7 1f) (0 N. CO W I E (V co V U) o r CO 0) - N N N N N N N N N N CO M M M M CO CO M M M • I- ) V V N 2o C :: O « O O U O co N CO N CO N - O D co O D o0 D (O O av m co E ao CO m E J c" E 0 c7 E J #f .E p D .c a LL O a s 0 w o E Qa w C) Q j ( a w a Q u) W C9 co