Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout214-1267. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU G-15C Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 214-126 50-029-20647-03-00 11889 Surface Intermediate Liner Liner Liner 9025 2635 9362 628 938 2575 10869 13-3/8" 9-5/8" 7" 3-1/2" x 3-3/16" 2-3/8" 9027 37 - 2672 34 - 9396 8900 - 9528 8873 - 9811 9313 - 11888 37 - 2672 34 - 8385 7925 - 8511 7900 - 8757 8307 - 9025 11848, 11833 2670 4760 5410 10530 11780 10869 5380 6870 7240 10160 11200 10350 - 11848 5-1/2" 17# x 4-1/2" 12.6# L-80 32 - 8963 9019 - 9025 Conductor 80 20" x 30" 38 - 118 38 - 118 5-1/2" BOT 3-H Packer 8833 7864 Aras Worthington for Torin Roschinger Operations Manager Finn Oestgaard finn.oestgaard@hilcorp.com 907.564.5026 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028280 32 - 7982 N/A N/A 273 583 25732 10769 36 26 1700 1950 700 600 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV Installed 8833, 7864 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 12:05 pm, Sep 20, 2024 Digitally signed by Aras Worthington (4643) DN: cn=Aras Worthington (4643) Date: 2024.09.20 10:59:19 - 08'00' Aras Worthington (4643) RBDMS JSB 092724 DSR-9/27/24WCB 10-3-2024 ACTIVITY DATE SUMMARY 9/16/2024 LRS #1 1.5" 0.134WT blue coil Objective: Plug and Adperf. MIRU. Function test BOPs upon installation. RIH with 1.75" drift bha. RIH to 11150 CTMD without issue. POOH for GR/CCL. ***Job Continued on 9/17/2024*** 9/17/2024 LRS #1 1.5" 0.134WT blue coil Objective: Plug and Adperf. Continue OOH with drift BHA. Make up and RIH with HES memory GR/CCL with 1.76" bullnose and 1.5" bowspring centralizer. Log from 11150 to 8550. Flag pipe for plug set. POOH. +10' correction. RIH w/NS 2-3/8" CIBP with 1.75" nose cone and set mid element 10,869' ME. RIH w/30' of Millenium 1.56" guns with 1.76" bull nose on bottom and perforate 10350-10380. RDMO ***Job Complete*** Daily Report of Well Operations PBU G-15C gg RIH w/NS 2-3/8" CIBP with 1.75" nose cone andg set mid element 10,869' ME. RIH w/30' of Millenium 1.56" guns with 1.76" bull nose on bottom and perforate 10350-10380 CIBP and adperfs are correctly shown on the WBS, below. -WCB 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU G-15C Mill CIBP Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 214-126 50-029-20647-03-00 11889 Surface Intermediate Liner Liner Liner 9025 2635 9362 628 938 2575 11849 13-3/8" 9-5/8" 7" 3-1/2" x 3-3/16" 2-3/8" 9025 37 - 2672 34 - 9396 8900 - 9528 8873 - 9811 9313 - 11888 37 - 2672 34 - 8385 7925 - 8511 7900 - 8757 8307 - 9025 11848, 11833 2670 4760 5410 10530 11780 None 5380 6870 7240 10160 11200 10636 - 11848 5-1/2" 17# x 4-1/2" 12.6# L-80 32 - 8963 9026 - 9025 Conductor 80 20" x 30" 38 - 118 38 - 118 5-1/2" BOT 3-H Packer 8833, 7864 8833 7864 Torin Roschinger Operations Manager Kirsty Glasheen kirsty.glasheen@hilcorp.com 907-564-5258 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028280 32 - 7982 N/A N/A 165 324 18782 22391 24 111 1700 1600 606 189 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Samantha Carlisle at 10:51 am, Jan 31, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2024.01.30 11:36:14 -09'00' Torin Roschinger (4662) DSR-1/31/24WCB 2024-06-25 RBDMS JSB 020824 ACTIVITY DATE SUMMARY 1/25/2024 CTU LRS #1 Objective mill 2-3/8" CIBP MIRU ***In progress*** 1/26/2024 CTU LRS #1 Objective mill 2-3/8" CIBP MIRU. L&K well. RIH w/ 1.77" reverse clutch mill BHA. Tag top of CIBP 11150'. Begin milling and do not make progress after 2 hours. Trip out of hole and check tools. Mill has a shiny spot in the center of the face. Looks like just spinning on the shear stud. Make up and RBIH with 1.75" venturi burnshoe assembly. Tag plug at 11150. MIll and push to 11848 CTMD. POOH and lay down BHA. Multiple pieces of slip segments recovered, no core. Well freeze protected with 58bbl of diesel. Well status relayed to pad operator. RDMO. ***Job Complete*** Daily Report of Well Operations PBU G-15C Tag top of CIBP 11150'.g Begin milling and do not make progress after 2 hours. Trip out of hole and checkgg g tools. Mill has a shiny spot in the center of the face. Looks like just spinning on the fy jg shear stud. Make up and RBIH with 1.75" venturi burnshoe assembly. Tag plug at 11150. MIll and push to 11848 CTMD. POOH CIBP fish correctly shown on new WBS, below. -WCB CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Regg, James B (OGC) To:AOGCC Records (CED sponsored) Subject:FW: OPERABLE: Producer G-15C (PTD #2141260) passed TIFL after setting DGLVs Date:Friday, September 30, 2022 10:15:54 AM Attachments:image003.png image005.png Jim Regg Supervisor, Inspections AOGCC 333 W. 7th Ave, Suite 100 Anchorage, AK 99501 907-793-1236 From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Sent: Friday, September 30, 2022 5:56 AM To: Regg, James B (OGC) <jim.regg@alaska.gov> Cc: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Stan Golis <sgolis@hilcorp.com>; PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Subject: OPERABLE: Producer G-15C (PTD #2141260) passed TIFL after setting DGLVs Mr. Regg, Producer G-15C (PTD #2141260) had DGLVs set on 09/23/22. On 09/29/22 DHD performed a passing warm TIFL. The passing TIFL indicates two competent barriers and the well is now classified back to OPERABLE. Please respond with any questions. Andy Ogg Hilcorp Alaska LLC Field Well Integrity andrew.ogg@hilcorp.com P: (907) 659-5102 M: (307)399-3816 From: PB Wells Integrity Sent: Tuesday, September 20, 2022 5:14 PM To: jim.regg@alaska.gov Cc: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Stan Golis <sgolis@hilcorp.com>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com> Subject: UNDER EVALUATION: Producer G-15C (PTD #2141260) Sustained Casing Pressure IA Mr. Regg, Producer G-15C (PTD #2141260) IAP was reported to be at 2440 psi on 09/20/22. Gas lift valves were recently run to resolve TxIA communication and subsequent TIFL failed. The well is now classified as UNDER EVALUATION and on a 28 day clock to be resolved. Plan forward: 1. Slickline: Install dummy valves with extend packing. 2. Downhole Diagnostics: TIFL 3. Well Integrity: Further action as required. Please call with any questions or concerns. Field Well Integrity / Compliance Ryan.Holt@Hilcorp.com P: (907) 659-5102 M: (907) 232-1005 From: PB Wells Integrity Sent: Thursday, September 15, 2022 10:41 AM To: Abbie Barker <Abbie.Barker@hilcorp.com>; Alaska JMS User <akimsuser@hilcorp.com>; Noel Nocas <Noel.Nocas@hilcorp.com>; PB EOC Specialists <PBEOCSpecialists@hilcorp.com>; PB Wells Optimization Engineers <PBWellsOptimizationEngineers@hilcorp.com>; PBW GC1 Field Lead Operator <PBWGC1FieldLeadOperator@hilcorp.com>; PBW GC1 Foreman <PBWGC1Foreman@hilcorp.com>; PBW GC1 Wellpad DG <PBWGC1WellpadDG@hilcorp.com>; PBW GC1 Wellpad EK <PBWGC1WellpadEK@hilcorp.com>; PBW GC1 Wellpad F <PBWGC1WellpadF@hilcorp.com>; PBW GC1 Wellpad YP <PBWGC1WellpadYP@hilcorp.com>; PBW PCC Leads <GC3ProdContCenterLeads@hilcorp.com>; Wyatt Rivard <wrivard@hilcorp.com> Cc: Stan Golis <sgolis@hilcorp.com>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Kevin Brackett <Kevin.Brackett@hilcorp.com>; John Condio - (C) <John.Condio@hilcorp.com>; Alaska IMS User <akimsuser@hilcorp.com> Subject: UNDER EVALUATION: Producer G-15C (PTD #2141260) TxIA Communication All, Producer G-15C (PTD #2141260) was reported by operation to have increased IA bleed frequency while shut in. DHD confirmed ~600 psi / day IA re-pressurization on 09/14/22. The well is now classified a UNDER EVALUATION and on a 28 day clock to be resolved. No agency notification is required as casing pressure did not exceed NOL. Plan Forward: 1. Slickline: Set DGLV 2. Downhole Diagnostics: TIFL 3. Well Integrity: Further action as needed Please call with any questions or concerns. Ryan Holt Hilcorp Alaska LLC Field Well Integrity / Compliance Ryan.Holt@Hilcorp.com P: (907) 659-5102 M: (907) 232-1005 From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Sunday, January 14, 2018 2:52 PM To: AK, OPS EOC Specialists <AKOPSEOCSpecialists@bp.com>; AK, OPS GC1 Facility OTL <AKOPSGC1FacilityOTL@bp.com>; AK, OPS GC1 Field O&M TL <AKOPSGC1FieldOMTL2@bp.com>; AK, OPS GC1 OSM <AKOPSGC1OSM@bp.com>; AK, OPS GC1 Wellpad Lead <AKOPSGC1WellpadLead@bp.com>; AK, OPS PCC Ops Lead <AKOPSPCCOpsLead@bp.com>; AK, OPS Prod Controllers <akopsprodcontrollers1@bp.com>; AK, OPS Well Pad EKG <AKOPSWellPadEKG@bp.com>; Ak, Ops West Area TL <AkOpsWestAreaTL@bp.com>; AK, RES GPB East Wells Opt Engr <AKRESGPBEastWellsOptEngr@bp.com>; AK, RES GPB West Wells Opt Engr <AKRESGPBWestWellsOpt2@bp.com>; Oshiro, Joleen <JOLEEN.OSHIRO@bp.com>; 'Regg, James B (DOA) (jim.regg@alaska.gov)' <jim.regg@alaska.gov> Cc: AK, GWO Completions Well Integrity <AKDCWLCompletionsSupt@bp.com>; AK, GWO DHD Well Integrity <AKD&CDHDWellIntegri@bp.com>; AK, GWO Projects Well Integrity <AKDCProjectsWellIntegrityEngineer@bp.com>; AK, GWO SUPT Well Integrity <AKDCWellIntegrityCoordinator@bp.com>; AK, GWO Well Integrity Well Information <akgwowellintegritywe@bp.com>; AK, OPS FF Well Ops Comp Rep <AKOPSFFWellOpsCompRep@bp.com>; AKIMS App User <akimsuser.service@bp.com>; Cismoski, Doug A <CismosDA@BP.com>; Daniel, Ryan <Ryan.Daniel@bp.com>; Dempsey, David G <David.Dempsey1@bp.com>; Hibbert, Michael <Michael.Hibbert@BP.com>; Janowski, Carrie <Carrie.Janowski@bp.com>; Montgomery, Travis J <Travis.Montgomery@bp.com>; Munk, Corey <Corey.Munk@bp.com>; Obrigewitch, Beau <BEAU.OBRIGEWITCH@bp.com>; O'connor, Katherine <Katherine.O'connor@bp.com>; Romo, Louis A <Louis.Romo@bp.com>; Sternicki, Oliver R <Oliver.Sternicki@bp.com>; Tempel, Joshua <Joshua.Tempel@bp.com>; Worthington, Aras J <Aras.Worthington@bp.com>; 'chris.wallace@alaska.gov' <chris.wallace@alaska.gov> Subject: OPERABLE: Producer G-15C (PTD #2141260) Well barriers restored with tubing patch, MITs passed All, Producer G-15C (PTD #2141260) was originally made not operable on 02/02/16 for having TxIA communication through a leak near the packer. On 1/8/2018 slickline completed setting a tubing patch from 8805’-8830’ MD covering the known tubing leak. The well passed a CMIT-TxIA to 2,553psi on 01/06/2018 and MIT-T to 2,611psi on 1/8/2018. The passing pressure test confirms that well barriers has successfully been restored. At this time the well is reclassified as Operable. Please note that coil will need to complete milling the CIBP in the liner before the well can be brought online. Please respond with any questions, Joshua Stephens Well Integrity Engineer Office: 907-659-8110 Cell: 907-341-9068 From: AK, D&C Well Integrity Coordinator Sent: Friday, June 10, 2016 1:35 PM To: AK, OPS GC1 Field O&M TL; AK, OPS GC1 OSM; AK, OPS GC1 Wellpad Lead; AK, OPS GC1 Facility OTL; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, GWO SUPT Special Projects; AK, GWO SUPT Slickline; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; AK, OPS Well Pad DG; Oshiro, Joleen; 'Regg, James B (DOA) (jim.regg@alaska.gov)' Cc: AK, GWO DHD Well Integrity; AK, GWO Projects Well Integrity; AK, OPS FF Well Ops Comp Rep; Morrison, Spencer; 'chris.wallace@alaska.gov'; Hibbert, Michael; Janowski, Carrie; Montgomery, Travis J; Munk, Corey; Obrigewitch, Beau; Pettus, Whitney; Sternicki, Oliver R; Tempel, Troy; Worthington, Aras J Subject: NOT OPERABLE: Producer G-15C (PTD #2141260) Economic Evaluation Complete All, Producer G-15C (PTD #2141260) did not flow during the well test for economic evaluation. The well is reclassified as Not Operable. The well is secured with a CIBP. Work Completed: 1. E-line: Set CIBP at 9390’ MD – DONE 05/19/16 2. Operations: POP well for economic evaluation – DONE 05/22/16; did not flow 3. DHD: Monitor WHP’s – DONE 06/10/16; T/I/O = 190/190/Vac 4. WIS: Reclassify as Not Operable – DONE 06/10/16 Thanks, Adrienne McVey Well Integrity Superintendent – GWO Alaska (Alternate: Jack Lau) Office: (907) 659-5102 Email: AKDCWellIntegrityCoordinator@BP.com From: AK, D&C Well Integrity Coordinator Sent: Friday, May 20, 2016 10:48 AM To: AK, OPS GC1 Field O&M TL; AK, OPS GC1 OSM; AK, OPS GC1 Wellpad Lead; AK, OPS GC1 Facility OTL; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; AK, OPS Well Pad DG; Oshiro, Joleen; 'Regg, James B (DOA) (jim.regg@alaska.gov)' Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Morrison, Spencer; AK, D&C Well Integrity Coordinator; 'chris.wallace@alaska.gov'; Hibbert, Michael; Janowski, Carrie; Montgomery, Travis J; Munk, Corey; Obrigewitch, Beau; Pettus, Whitney; Sternicki, Oliver R; Tempel, Troy; Worthington, Aras J Subject: UNDER EVALUATION: Producer G-15C (PTD #2141260) Economic Evaluation All, Producer G-15C (PTD #2141260) has a history of TxIA communication when shut in. A leak detect log on 12/03/14 indicated a leak at the production packer. The well has two liner top packers. The planned repair for the production packer leak was to pull the uppermost liner top packer, and replace it with an extended liner top packer designed to straddle the leak, but a 2015 attempt to retrieve the liner top packer was unsuccessful. On 05/19/16, E-line set a CIBP isolating all perforations. The plan forward is to POP the well Under Evaluation and obtain well tests, in order to determine whether gas is leaking by the liner top packers. This will help determine accurate formation gas rates, and determine whether the well has future utility. The well is reclassified as Under Evaluation. Plan Forward: 1. E-line: Set CIBP at 9390’ MD – DONE 05/19/16 2. Operations: POP well for economic evaluation 3. DHD: Assist Operations with POP Please reply if in conflict with proposed plan. Thanks, Adrienne McVey Well Integrity Superintendent – GWO Alaska (Alternate: Jack Lau) Office: (907) 659-5102 Email: AKDCWellIntegrityCoordinator@BP.com From: AK, D&C Well Integrity Coordinator Sent: Tuesday, February 02, 2016 11:52 AM To: AK, OPS GC1 Field O&M TL; AK, OPS GC1 OSM; AK, OPS GC1 Wellpad Lead; AK, OPS GC1 Facility OTL; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; AK, OPS Well Pad DG; Hidalgo, Ramon; 'chris.wallace@alaska.gov' Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Sayers, Jessica; Dickerman, Eric; 'Regg, James B (DOA) (jim.regg@alaska.gov)'; Morrison, Spencer; Pettus, Whitney; AK, D&C Well Integrity Coordinator Subject: NOT OPERABLE: Producer G-15C (PTD #2141260) Sustained Inner Annulus Casing Pressure over MOASP All, Producer G-15C (PTD #2141260) failed a warm TIFL post POP on January 31, 2016, demonstrating a lack of competent barriers downhole. At this time the well has been reclassified as Not Operable, and has been shut in and isolated. Please call with any questions. Laurie Climer (Covering for Kevin Parks) BP Alaska - Well Integrity Coordinator WIC Office: 907.659.5102 WIC Email: AKDCWellIntegrityCoordinator@BP.com From: AK, D&C Well Integrity Coordinator Sent: Sunday, January 17, 2016 7:47 AM To: AK, OPS GC1 Field O&M TL; AK, OPS GC1 OSM; AK, OPS GC1 Wellpad Lead; AK, OPS GC1 Facility OTL; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; AK, OPS Well Pad DG; Hidalgo, Ramon; 'chris.wallace@alaska.gov' Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Sayers, Jessica; Dickerman, Eric; 'Regg, James B (DOA) (jim.regg@alaska.gov)'; Morrison, Spencer; Pettus, Whitney Subject: UNDER EVALUATION: Producer G-15C (PTD #2141260) Sustained Inner Annulus Casing Pressure over MOASP All, Producer G-15C (PTD #2141260) was reported to have sustained inner annulus casing pressure over MOASP on January 14, 2016. The pressures were confirmed to be TBG/IA/OA = 2310/2315/VAC psi on January 15, 2016. A subsequent cold TIFL performed on January 16, 2016 failed on the overnight build up rate indicating a potential lack of two competent barriers in the wellbore. At this time, the well has been reclassified as Under Evaluation for additional diagnostics. Plan Forward: 1. Downhole Diagnostics: Cold TIFL – FAILED 01/15/16 2. Operations: Place well on production 3. Downhole Diagnostics: Warm TIFL 4. Well Integrity Engineer: Additional diagnostics as needed A copy of the TIO Plot has been included for reference. Please call with any questions or concerns. Thank you, Whitney Pettus (Alternate: Kevin Parks) BP Alaska - Well Integrity Coordinator WIC Office: 907.659.5102 WIC Email: AKDCWellIntegrityCoordinator@BP.com The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Regg, James B (OGC) To:AOGCC Records (CED sponsored) Subject:FW: UNDER EVALUATION: Producer G-15C (PTD #2141260) Sustained Casing Pressure IA Date:Wednesday, September 21, 2022 10:08:09 AM Attachments:image003.png image005.png Jim Regg Supervisor, Inspections AOGCC 333 W. 7th Ave, Suite 100 Anchorage, AK 99501 907-793-1236 From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Sent: Tuesday, September 20, 2022 5:14 PM To: Regg, James B (OGC) <jim.regg@alaska.gov> Cc: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Stan Golis <sgolis@hilcorp.com>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com> Subject: UNDER EVALUATION: Producer G-15C (PTD #2141260) Sustained Casing Pressure IA Mr. Regg, Producer G-15C (PTD #2141260) IAP was reported to be at 2440 psi on 09/20/22. Gas lift valves were recently run to resolve TxIA communication and subsequent TIFL failed. The well is now classified as UNDER EVALUATION and on a 28 day clock to be resolved. Plan forward: 1. Slickline: Install dummy valves with extend packing. 2. Downhole Diagnostics: TIFL 3. Well Integrity: Further action as required. Please call with any questions or concerns. Field Well Integrity / Compliance Ryan.Holt@Hilcorp.com P: (907) 659-5102 M: (907) 232-1005 From: PB Wells Integrity Sent: Thursday, September 15, 2022 10:41 AM To: Abbie Barker <Abbie.Barker@hilcorp.com>; Alaska JMS User <akimsuser@hilcorp.com>; Noel Nocas <Noel.Nocas@hilcorp.com>; PB EOC Specialists <PBEOCSpecialists@hilcorp.com>; PB Wells Optimization Engineers <PBWellsOptimizationEngineers@hilcorp.com>; PBW GC1 Field Lead Operator <PBWGC1FieldLeadOperator@hilcorp.com>; PBW GC1 Foreman <PBWGC1Foreman@hilcorp.com>; PBW GC1 Wellpad DG <PBWGC1WellpadDG@hilcorp.com>; PBW GC1 Wellpad EK <PBWGC1WellpadEK@hilcorp.com>; PBW GC1 Wellpad F <PBWGC1WellpadF@hilcorp.com>; PBW GC1 Wellpad YP <PBWGC1WellpadYP@hilcorp.com>; PBW PCC Leads <GC3ProdContCenterLeads@hilcorp.com>; Wyatt Rivard <wrivard@hilcorp.com> Cc: Stan Golis <sgolis@hilcorp.com>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; Kevin Brackett <Kevin.Brackett@hilcorp.com>; John Condio - (C) <John.Condio@hilcorp.com>; Alaska IMS User <akimsuser@hilcorp.com> Subject: UNDER EVALUATION: Producer G-15C (PTD #2141260) TxIA Communication All, Producer G-15C (PTD #2141260) was reported by operation to have increased IA bleed frequency while shut in. DHD confirmed ~600 psi / day IA re-pressurization on 09/14/22. The well is now classified a UNDER EVALUATION and on a 28 day clock to be resolved. No agency notification is required as casing pressure did not exceed NOL. Plan Forward: 1. Slickline: Set DGLV 2. Downhole Diagnostics: TIFL 3. Well Integrity: Further action as needed Please call with any questions or concerns. Ryan Holt Hilcorp Alaska LLC Field Well Integrity / Compliance Ryan.Holt@Hilcorp.com P: (907) 659-5102 M: (907) 232-1005 From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Sunday, January 14, 2018 2:52 PM To: AK, OPS EOC Specialists <AKOPSEOCSpecialists@bp.com>; AK, OPS GC1 Facility OTL <AKOPSGC1FacilityOTL@bp.com>; AK, OPS GC1 Field O&M TL <AKOPSGC1FieldOMTL2@bp.com>; AK, OPS GC1 OSM <AKOPSGC1OSM@bp.com>; AK, OPS GC1 Wellpad Lead <AKOPSGC1WellpadLead@bp.com>; AK, OPS PCC Ops Lead <AKOPSPCCOpsLead@bp.com>; AK, OPS Prod Controllers <akopsprodcontrollers1@bp.com>; AK, OPS Well Pad EKG <AKOPSWellPadEKG@bp.com>; Ak, Ops West Area TL <AkOpsWestAreaTL@bp.com>; AK, RES GPB East Wells Opt Engr <AKRESGPBEastWellsOptEngr@bp.com>; AK, RES GPB West Wells Opt Engr <AKRESGPBWestWellsOpt2@bp.com>; Oshiro, Joleen <JOLEEN.OSHIRO@bp.com>; 'Regg, James B (DOA) (jim.regg@alaska.gov)' <jim.regg@alaska.gov> Cc: AK, GWO Completions Well Integrity <AKDCWLCompletionsSupt@bp.com>; AK, GWO DHD Well Integrity <AKD&CDHDWellIntegri@bp.com>; AK, GWO Projects Well Integrity <AKDCProjectsWellIntegrityEngineer@bp.com>; AK, GWO SUPT Well Integrity <AKDCWellIntegrityCoordinator@bp.com>; AK, GWO Well Integrity Well Information <akgwowellintegritywe@bp.com>; AK, OPS FF Well Ops Comp Rep <AKOPSFFWellOpsCompRep@bp.com>; AKIMS App User <akimsuser.service@bp.com>; Cismoski, Doug A <CismosDA@BP.com>; Daniel, Ryan <Ryan.Daniel@bp.com>; Dempsey, David G <David.Dempsey1@bp.com>; Hibbert, Michael <Michael.Hibbert@BP.com>; Janowski, Carrie <Carrie.Janowski@bp.com>; Montgomery, Travis J <Travis.Montgomery@bp.com>; Munk, Corey <Corey.Munk@bp.com>; Obrigewitch, Beau <BEAU.OBRIGEWITCH@bp.com>; O'connor, Katherine <Katherine.O'connor@bp.com>; Romo, Louis A <Louis.Romo@bp.com>; Sternicki, Oliver R <Oliver.Sternicki@bp.com>; Tempel, Joshua <Joshua.Tempel@bp.com>; Worthington, Aras J <Aras.Worthington@bp.com>; 'chris.wallace@alaska.gov' <chris.wallace@alaska.gov> Subject: OPERABLE: Producer G-15C (PTD #2141260) Well barriers restored with tubing patch, MITs passed All, Producer G-15C (PTD #2141260) was originally made not operable on 02/02/16 for having TxIA communication through a leak near the packer. On 1/8/2018 slickline completed setting a tubing patch from 8805’-8830’ MD covering the known tubing leak. The well passed a CMIT-TxIA to 2,553psi on 01/06/2018 and MIT-T to 2,611psi on 1/8/2018. The passing pressure test confirms that well barriers has successfully been restored. At this time the well is reclassified as Operable. Please note that coil will need to complete milling the CIBP in the liner before the well can be brought online. Please respond with any questions, Joshua Stephens Well Integrity Engineer Office: 907-659-8110 Cell: 907-341-9068 From: AK, D&C Well Integrity Coordinator Sent: Friday, June 10, 2016 1:35 PM To: AK, OPS GC1 Field O&M TL; AK, OPS GC1 OSM; AK, OPS GC1 Wellpad Lead; AK, OPS GC1 Facility OTL; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, GWO SUPT Special Projects; AK, GWO SUPT Slickline; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; AK, OPS Well Pad DG; Oshiro, Joleen; 'Regg, James B (DOA) (jim.regg@alaska.gov)' Cc: AK, GWO DHD Well Integrity; AK, GWO Projects Well Integrity; AK, OPS FF Well Ops Comp Rep; Morrison, Spencer; 'chris.wallace@alaska.gov'; Hibbert, Michael; Janowski, Carrie; Montgomery, Travis J; Munk, Corey; Obrigewitch, Beau; Pettus, Whitney; Sternicki, Oliver R; Tempel, Troy; Worthington, Aras J Subject: NOT OPERABLE: Producer G-15C (PTD #2141260) Economic Evaluation Complete All, Producer G-15C (PTD #2141260) did not flow during the well test for economic evaluation. The well is reclassified as Not Operable. The well is secured with a CIBP. Work Completed: 1. E-line: Set CIBP at 9390’ MD – DONE 05/19/16 2. Operations: POP well for economic evaluation – DONE 05/22/16; did not flow 3. DHD: Monitor WHP’s – DONE 06/10/16; T/I/O = 190/190/Vac 4. WIS: Reclassify as Not Operable – DONE 06/10/16 Thanks, Adrienne McVey Well Integrity Superintendent – GWO Alaska (Alternate: Jack Lau) Office: (907) 659-5102 Email: AKDCWellIntegrityCoordinator@BP.com From: AK, D&C Well Integrity Coordinator Sent: Friday, May 20, 2016 10:48 AM To: AK, OPS GC1 Field O&M TL; AK, OPS GC1 OSM; AK, OPS GC1 Wellpad Lead; AK, OPS GC1 Facility OTL; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; AK, OPS Well Pad DG; Oshiro, Joleen; 'Regg, James B (DOA) (jim.regg@alaska.gov)' Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Morrison, Spencer; AK, D&C Well Integrity Coordinator; 'chris.wallace@alaska.gov'; Hibbert, Michael; Janowski, Carrie; Montgomery, Travis J; Munk, Corey; Obrigewitch, Beau; Pettus, Whitney; Sternicki, Oliver R; Tempel, Troy; Worthington, Aras J Subject: UNDER EVALUATION: Producer G-15C (PTD #2141260) Economic Evaluation All, Producer G-15C (PTD #2141260) has a history of TxIA communication when shut in. A leak detect log on 12/03/14 indicated a leak at the production packer. The well has two liner top packers. The planned repair for the production packer leak was to pull the uppermost liner top packer, and replace it with an extended liner top packer designed to straddle the leak, but a 2015 attempt to retrieve the liner top packer was unsuccessful. On 05/19/16, E-line set a CIBP isolating all perforations. The plan forward is to POP the well Under Evaluation and obtain well tests, in order to determine whether gas is leaking by the liner top packers. This will help determine accurate formation gas rates, and determine whether the well has future utility. The well is reclassified as Under Evaluation. Plan Forward: 1. E-line: Set CIBP at 9390’ MD – DONE 05/19/16 2. Operations: POP well for economic evaluation 3. DHD: Assist Operations with POP Please reply if in conflict with proposed plan. Thanks, Adrienne McVey Well Integrity Superintendent – GWO Alaska (Alternate: Jack Lau) Office: (907) 659-5102 Email: AKDCWellIntegrityCoordinator@BP.com From: AK, D&C Well Integrity Coordinator Sent: Tuesday, February 02, 2016 11:52 AM To: AK, OPS GC1 Field O&M TL; AK, OPS GC1 OSM; AK, OPS GC1 Wellpad Lead; AK, OPS GC1 Facility OTL; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; AK, OPS Well Pad DG; Hidalgo, Ramon; 'chris.wallace@alaska.gov' Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Sayers, Jessica; Dickerman, Eric; 'Regg, James B (DOA) (jim.regg@alaska.gov)'; Morrison, Spencer; Pettus, Whitney; AK, D&C Well Integrity Coordinator Subject: NOT OPERABLE: Producer G-15C (PTD #2141260) Sustained Inner Annulus Casing Pressure over MOASP All, Producer G-15C (PTD #2141260) failed a warm TIFL post POP on January 31, 2016, demonstrating a lack of competent barriers downhole. At this time the well has been reclassified as Not Operable, and has been shut in and isolated. Please call with any questions. Laurie Climer (Covering for Kevin Parks) BP Alaska - Well Integrity Coordinator WIC Office: 907.659.5102 WIC Email: AKDCWellIntegrityCoordinator@BP.com From: AK, D&C Well Integrity Coordinator Sent: Sunday, January 17, 2016 7:47 AM To: AK, OPS GC1 Field O&M TL; AK, OPS GC1 OSM; AK, OPS GC1 Wellpad Lead; AK, OPS GC1 Facility OTL; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; AK, OPS Well Pad DG; Hidalgo, Ramon; 'chris.wallace@alaska.gov' Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Sayers, Jessica; Dickerman, Eric; 'Regg, James B (DOA) (jim.regg@alaska.gov)'; Morrison, Spencer; Pettus, Whitney Subject: UNDER EVALUATION: Producer G-15C (PTD #2141260) Sustained Inner Annulus Casing Pressure over MOASP All, Producer G-15C (PTD #2141260) was reported to have sustained inner annulus casing pressure over MOASP on January 14, 2016. The pressures were confirmed to be TBG/IA/OA = 2310/2315/VAC psi on January 15, 2016. A subsequent cold TIFL performed on January 16, 2016 failed on the overnight build up rate indicating a potential lack of two competent barriers in the wellbore. At this time, the well has been reclassified as Under Evaluation for additional diagnostics. Plan Forward: 1. Downhole Diagnostics: Cold TIFL – FAILED 01/15/16 2. Operations: Place well on production 3. Downhole Diagnostics: Warm TIFL 4. Well Integrity Engineer: Additional diagnostics as needed A copy of the TIO Plot has been included for reference. Please call with any questions or concerns. Thank you, Whitney Pettus (Alternate: Kevin Parks) BP Alaska - Well Integrity Coordinator WIC Office: 907.659.5102 WIC Email: AKDCWellIntegrityCoordinator@BP.com The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. Operator Name:2. Development Exploratory Service… 5 … … Permit to Drill Number:214-126 6.50-029-20647-03-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 11888 11150 9565 8833 11833 11150 7864 Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 80 20" x 30" 38 - 118 38 - 118 Surface 2635 13-3/8" 37 - 2672 37 - 2672 5380 2670 Intermediate 9362 9-5/8" 34 - 9396 34 - 8385 6870 4760 Production 628 7" 8900 - 9528 7925 - 8511 7240 5410 Perforation Depth: Measured depth: 10636 - 11848 feet True vertical depth:9026 - 9025 feet Tubing (size, grade, measured and true vertical depth) 5- 1/ 2" 17# x 4- 1/ 2" 12.6#, L-80 32- 8963 32- 7982 8833 7864Packers and SSSV (type, measured and true vertical depth) 5-1/2" BOT 3-H Packer Liner 3015 3-1/2" x 3-3/16" 8873 - 9811 7900 - 8757 10160 10530 Liner 2575 2 - 3/8" 9313 - 11888 8307 - 9025 11200 11760 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 276 4 300 675 13000 11 450 25097 265 751 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Noel Nocas noel.nocas@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:907-564-5278 Treatment descriptions including volumes used and final pressure: 13. Sr Operations Manager Operations Performed1. Abandon …Plug Perforations 5 Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG …GINJ …SUSP ……SPLUG 16. Well Status after work:Oil 5 Gas … Exploratory …Development 5 Stratigraphic … 15. Well Class after work: …Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured9025 Sundry Number or N/A if C.O. Exempt: N/A Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … Operations shutdown … Change Approved Program … Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend 5Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well… 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028280 PBU G-15C 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations By Samantha Carlisle at 1:40 pm, Aug 18, 2021 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.08.18 12:43:06 -08'00' Stan Golis (880) 11,889 RBDMS HEW 8/19/2021MGR19AUG2021 SFD 8/19/2021DSR-8/18/21 SFD 8/19/2021 ACTIVITYDATE SUMMARY 7/20/2021 ***WELL FLOWING ON ARRIVAL***(perforating). RAN 1.75" SAMPLE BAILER TO DEVIATION @ 10,134' SLM (no sample). ***WELL LEFT S/I ON DEPARTURE, JOB COMPLETE*** 8/6/2021 LRS Well Test Unit 6. CTU Assist. Begin WSR 8/6/21, Perform Unit Move, Rig Up. Inlet Well G-15, Outlet Well G-14. Job in Progress, Continued on WSR 8/7/21 8/7/2021 LRS Well Test Unit 6. CTU Assist. Continue from WSR 8/6/21. PT, Begin SB for CTU, Pause WSR for Temporary Hardline Rig Up, Resume WSR/ SB for CTU. Inlet Well G-15, Outlet Well G-14. Job in Progress, Continued on WSR 8/8/21 8/7/2021 CTU #6, 1.5" CT - 25.5bbl, Job Objective: Set CIBP, Addperf MIRU. Weekly BOP test. ...In Progress... 8/8/2021 CTU #6, 1.5" CT - 25.5bbl, Job Objective: Set CIBP, Addperf. Continued RU. Drift with 1.75" DJN to 11,200' ctm. MU/RIH with READ memory GR/CCL with 1.74" slickline centralizer on bottom. Previous attempts to enter LTP at 8803 with 1.69" logging tools, unable to enter. ~ 1.75" "bullnose" has been successful. Log from 11,200 up to 8500'. POOH, confirm good data. RIH with 2-3/8" CIBP. ...In Progress... 8/8/2021 LRS Well Test Unit 6. CTU Assist. Continue from WSR 8/7/21, Continue SB for CTU. End SB, Assist CTU. Inlet Well G-15, Outlet Well G-14. Job in Progress, Continued on WSR 8/9/21 8/9/2021 LRS Well Test Unit 6. CTU Assist. Continue from WSR 8/8/21. Continue Assist CTU, POP, Purge Well, 8 HR Well Test, Blowdown & Secure Unit, Crew off Location. Inlet Well G-15, Outlet Well G-14. Job in Progress, Continued on WSR 8/10/21 8/9/2021 CTU #6. 1.5" CT - 25.5bbl, Job Objective: CIBP, Addperf. Set 2-3/8" CIBP at 11,150. POOH. Stand by for well test. Well test complete at 19:00. OE reviewed well test result and agreed on plan forward to perforate. Take control of well from WTU. RIH with 31' x 1.56" HES Perfecta charges. ...In Progress... 8/10/2021 LRS Well Test Unit 6. CTU Assist. Continue WSR from 8/9/21. Begin SB for CTU, Continue SB. Inlet Well G-15, Outlet Well G-16. Job in Progress. Continue WSR on 8/11/21. 8/10/2021 CTU #6, 1.5" CT - 25.5bbl, Job Objective: CIBP, Addperf. Continued RIH with gun #1 31' x 1.56" HES Perfecta, unable to pass the LTP at 8781'ctm. POOH, inspect tool and bullnose on bottom of perf gun had marks where it was tagging, SWAP BULLNOSE FOR A 1.74" FLUTED SLICKLINE CENTRALIZER. RBIH with gun #1. Correct to bottom shot at CIBP at 11,150' Perf 10666.75-10698. POOH. RIH w/gun #2 31' x 1.56" HES Perfecta. Perf 10636- 10667.25'. 0.5' of overlap in the middle of perf zone to perf continuous 10636-10698. POOH. Blow down coil for pipe swap. RDMO. ***Complete. WTU in control of well on departure.*** 8/11/2021 LRS Well Test Unit 6. CTU Assist. Continue WSR from 8/10/21. Continue SB for CTU, End SB. POP, Flow/ Stabilize Well, 4 HR Purge, 8 HR Well Test. Begin RDMO. Inlet Well G-15, Outlet Well G-16. Job in Progress. Continue WSR on 8/12/21. 8/12/2021 LRS Well Test Unit 6. CTU Assist. Continue WSR from 8/10/21. Complete RDMO. Inlet Well G-15, Outlet Well G-16. Job Complete/ End WSR Daily Report of Well Operations PBU G-15C 3'_3."A40"i r G V STATE OF ALASKA 11. Present Well Condition Summary: ALASKA OIL AND GAS CONSERVATION COMMISSION APR 10 2019 MD: REPORT OF SUNDRY WELL OPERATIONS Buret: 1. Operations Performed 11889 yyk �/�) �/�� Co Plugs Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operation 45HGttf6wif" true vertical Suspend ❑ Perforate 0 Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ measured Plug for Rednll ❑ Perforate Nev, Pool ❑ Repair Well 0 Re-enter Susp Well ❑ Other Set Tubing Patch 0 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work measured S. Permit to Drill Number 214-126 3. Address: P.O. Box 196612 Anchorage, Development 0 Exploratory ❑ Packer true vertical 7863 AK 99519-6612 Stratigraphic ❑ Service ❑ 1 S. API Number: 50-029-20647-03-00 7. Property Designation (Lease Number). ADL 028280 8. Well Name and Number: PBU GASC 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: 10160 / 11200 10530/11780 Perforation Depth: Measured depth: PRUDHOE BAY. PRUDHOE OIL 11. Present Well Condition Summary: Length: Size: MD: TVD: Buret: Collapse: Total Depth: measured 11889 feet Plugs measured None feet true vertical 9025 feet Junk measured 11548 feet Effective Depth: measured 11849 feet Packer measured 8833 feet true vertical 9025 feet Packer true vertical 7863 feet Casing: Length: Size: MD: TVD: Buret: Collapse: Structural 290 24433 9 0 260 Subsequent to operation: Conductor 80 20" x 30" 38-118 38-118 14. Attachments: (re uirw per 20 MC 25 070 25 071. s 25283) Daily Report of Well Operations 0 Copies of Logs and Surveys Run ❑ Printed and Electronic Fracture Stimulation Data ❑ 15. Well Class after work: Exploratory ❑ Surface 2635 13-3/8" 37-2672 37-2672 4930 2670 Intermediate 9362 9-5/8" 34-9396 34-8385 6870 4760 Liner 628 7" 8900-9528 7925-8511 7240 5410 Liner 3015 3-1/2" x 3-3/16" x 2-3/8" 8873-11888 7900-9025 10160 / 11200 10530/11780 Perforation Depth: Measured depth: 10713 -11848 Bret True vertical depth: 9025-9025 feel Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary Intervals treated (measured): 5-1/2" 17# x 4-1/2" 12.6#, L-80 32-8963 5-1/2" BOT 3-H Packer Treatment descriptions including volumes used and final pressure: No SSSV Installed 8833 32-7982 7863 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 290 24433 9 0 260 Subsequent to operation: 308 25187 3 0 225 14. Attachments: (re uirw per 20 MC 25 070 25 071. s 25283) Daily Report of Well Operations 0 Copies of Logs and Surveys Run ❑ Printed and Electronic Fracture Stimulation Data ❑ 15. Well Class after work: Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑ 16. Well Status after work: GSTOR ❑ WINJ ❑ Oil 0 Gas ❑ WDSPL ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Oshiro, Joleen Sundry Number or N/A if C.O. Exempt: N/A Contact Name: Oshiro, Joleen Authorized Title: EG Pad Engineer/Nev, Wells Delivery PE Contact Email: JOLEEN.OSHIRO®ibp.com Authorized Signature: i/ y I A �rj Contact Phone: +1 907 564 4606 .-1. /,/Daate: Form 10404 Revised 04/2017 -•V��/ i4BDMSAE'/APR 1 12019 Submit Original Only Daily Report of Well Operations PBU G -15C ACTIVITYnATF sl IKAKAARY ***WELL S/I ON ARRIVAL*** (tbg patch) RIG UP HES SLICKLINE UNIT 046 12/30/2017 ***CONT. ON 12/31/2017 WSR*** ***CONT. FROM 12/30/2017 WSR*** (tbg patch) SET 5-1/2" SLIP STOP C -SUB @ 6656' SLM PULLED S/O STA#10 @ 6320' MD & LGLV STA#12 @ 2936' MD SET RK-DGLV STA#12 @ 2936' MD SET RK -CIRC VALVE STA#10 @ 6320' MD PULLED 5-1/2" SLIP STOP C -SUB @ 6656' SLM LRS PERFORM CIRC OUT TO LOAD TBG AND IA 12/31/2017 ***CONT. ON 01/01/2018 WSR*** ***CONT. FROM 12/31/2017 WSR*** (tbg patch) LRS ATTEMPT CMIT-TxIA (TEST 3-1/2" LINER LAP & 2-3/8" CIBP) ***FAILED*** RIG DOWN HES SLICKLINE UNIT 046 DUE TO HIGH WINDS 1/1/2018 ***WELL LEFT S/1, START WEATHER TICKET-* ***CONT. FROM 01/01/2018 WSR*** (tbg patch) RIG UP HES SLICKLINE UNIT 046 1/2/2018 ***CONT. ON 01/03/2018 WSR*** ***CONT. FROM 01/02/2016 WSR*** (tbg patch) SET 5-1/2" SLIP STOP CATCHER @ 6355' SLM PULLED STA#10 RKP-CIRC VLV @ 6320' MD SET RK-DGLV IN STA #10 @ 6320' MD PULLED 5-1/2" SLIP STOP CATCHER @ 6355' SLM RAN 23'x 4.5" DUMMY PATCH DRIFT TO 8820' SLM LRS ESTABLISHED LLR OF 1.68 GAL/ MIN SET 55 KB BAKER LOWER PKR ASSEMBLY @ 8838' MD (mid -element at 8830' MD) DRIFT FREELY THRU LOWER PKR ASSEMBLY TO 8900' SLM W/ 2.20" CENT. SET 4-1/2" LNR TOP TEST TOOL IN LOWER PKR @ 8802' SLM ATTEMPT CMIT-TxIA 1/3/2018 ***CONT. ON 01/04/2018 WSR*** ***CONT. FROM 01/03/2018 WSR*** (tbg patch) PULLED 4-1/2" LNR TOP TEST TOOL @ 8802' SLM C -MIT FAILED SET 4-1/2" LNR TOP TEST TOOL @ 8802' SLM C -MIT FAILED PULLED 4-1/2" LNR TOP TEST TOOL @ 8802' SLM WING VALVE APPEARS TO BE LEAKING 1/4/2018 ***JOB IN PROGRESS / DSO NOTIFIED*** ***WELL S/I ON ARRIVAL*** (Patch tubing / liner) RIG UP SWCP 4516 TO SET LINER TOP TEST TOOL FOR CMIT-T x IA TO 2400 PSI. 1/5/2018 ***JOB IN PROGRESS, CONTINUED ON 1/6/18 WSR*** T/I/O = 250/30/VAC. Temp = SI. Assist Slickline with LDL. No AL. T FL @ surface. Cameron performed a passing PPPOT on IC. Assist SLB slickline as required. 1/7/2018 **WSR Continued on 01/08/18. ***CONTINUED FROM 1/7/18 WSR*** (Patch tubing / liner) EQUALIZE & PULL 2-7/8" XX PLUG BODY W/ RGS FROM 8,819' SLM 18,829- MD. DHD PERFORMED SUCCESSFUL MIT -T TO 2400 PSI. CURRENTLY ON WEATHER HOLD DUE TO HIGH WINDS. 1/8/2018 ***JOB IN PROGRESS, CONTINUED ON 1/9/18 WSR*** ***CONTINUED FROM 1/8/18 WSR*** (Patch tubing / liner) DRIFT TO 2-3/8" WFD CIBP AT 9,390' MD W/ 1.75" x 32'.2" BAILER (No issues). SET 5-1/2" SLIP STOP CATCHER SUB AT 6,389' SLM. PULL RK-DGLV'S FROM ST #10 (6,320' MD) & ST #12 (2,936' MD). SET RK-LGLV AT ST #12 (2,936' MD) & RK-DGLV AT ST #10 (6,320' MD). PULL EMPTY 5-1/2" SLIP STOP CATCHER SUB FROM 6,389' SLM. 1/9/2018 ***WELL S/I ON DEPARTURE, NOTIFIED PAD OPERATOR OF WELL STATUS*** Daily Report of Well Operations PBU G-1 5C CTU#8 1.5" CT. Job Scope: Drift/ Log/ Adperf RIH w/ 1.75" Drift Nozzle. Tag high at 10214'. Work down to 10686'. Appear to be plug debris. Work through TOL trouble spot at 9304'. Pooh. Notice scrape marks on the nozzle indicating plug debris. MU Motor & Venturi/Bumshoe BHA. Work Venturi from 9750' to a Tag at 11833'. Pooh. Seen similar overpull at TOL from the drift run. Pump down Coil & work free. Pooh. At surface, missing the Motor & Venturi/Bumshoe. Swiveled off between the Circ Sub & Motor. 3/6/2019 ***Continue Job on 3/7/19 WSR*** CTU#8 1.5" CT. Job Scope: Drift/ Log/ Adperf Freeze Protect Tbg w/ 38 bbls 60/40 Meth. Rig Down CTU and go to shop to repair leaking T -Bar Slide Cylinder. Rig CTU back up. Perform Weekly BOP Test. 3/7/2019 '**Continue on 03/08/19'** CTU#8 1.5" CT. Job Scope: Drift / Log /Adperf RIH w/WFT Fishing BHA. Tag top offish at 10817' ctm. Work motor to spin into fish. Pooh. Recover WFT Fish. Recover CIBP parts in Venturi. MU Baker Venturi w/ 1.77" Mule Shoe. Work Venturi from 9400' to 11215' below perforating depths. Puh to 9350' and dry drift clean to 11215'. Pooh. Venturi empty. MU & RIH w/ HES GR/CCL & 1.75" JSN. Log up from 11 150'to 8600'. Flag coil at 10950'. Pooh. 3/8/2019 '**Continued on 03/09/19"' CTU#8 1.5" CT. Job Scope: Drift / Log / Adperf Pooh with logging tools. Receive good data( +8' Correction). Correlate to Baker Hughes RPM log dated 18 -October -2014. RIH w/ 1.56" x 32' HES Millenium Perf Gun #1. Correct depth at flag. Perforate Interval 10960'- 10992'. fooh. All shots Fred, ball recovered. MU & RIH w/ 1.56" x 32' HES Millenium PerfGun #2. Correct depth at flag. Perforate Interval 10928'- 10960'. Pooh. All shots fired, ball recovered. MU & RIH w/ 1.56" x 32' HES Millenium Perf Gun #3. Correct depth at flag. Perforate Interval 10896'- 10928'. Pooh. All shots fired, ball recovered. RIH w/ HES GR/CCL & 1.75" JSN. Log from 11150' to 10450'. Flag coil at 10700'. Pooh. 3/9/2019 '**In Progress' CTU#8 1.5" CT. Job Scope: Drift / Log / Adperf Pooh w/ Logging Tools. Receive good data (+7' Correction). Correlate to Baker Hughes RPM Log dated 18 -October -2014. MU & RIH w/ 1.56" x 32' HES Millenium Perf Gun #4. Correct depth at flag. Perforate Interval 10713' - 10745'. Pooh. All shots fired, ball recovered. Stack down & change pac o s. Pressure Test Lubricator and notice reel leaking. Pinhole leak in the Coil - Make notifications. Freeze Protect Tbg w/ Diesel. Blow down reel w/ N2. Rig Down CTU & Head to Yard for Pipe Swap. 1.5" CT String #8142. Final Running Footage= 656k / 320k-cr. After discussion with town and well POP, decided not to return and finish remaining perf runs 3/10/2019 ***Job Complete*** TREE= 6-3/8"CNV WELLHEAD = MCEVOY ACTUATOR= SH 3000 CNV OKB. E LEV = 75.63' BF. E_EV = 41.79' KOP= 3100' N19x Angle = 9r@10545- 7°@10545'Datum DatumMID = 9962' Datum TVD= 8800' SS G-1 5CSAFETY 34 0545 PREVI0 SANGLE —PES: WELL S WELLBORINOTSHOWN 0176— MAX -USES CAUTION PULLING 35 KB LTA-SLV MAY BE WEDGED ON LOCATOR- _COND, _# COULD DROP @ SURFACE... O 2050' 5-1/2" OTIS ROM SSSV NP, D = 4.562" D - GAS LFT MANDRB-S I9-5/8" DV PKR -J 2621' 13-3/8" CSG, 72#, L-80, D = 12.347" 2672' Minimum ID = 1.78" @ 9324' WIPER PLUG BUSHING IN DEPLOY SLV OFFER 55K6 BTRADDLE PKR wlNS IXTE34DED PTSA (01/08118) S1/2" TBG, 17#, L-80_0232 bpf, D=4.892" 8803' - 3.70" BOT DEPLOY SLV w /4.50" OD SCOOP 8817 GLADE & 3.00" D SEAL BORE TOP (1 /08/18) LOWER 55KB STRADDLEPKRw/4WSPKR GUIDE SHOE, D = 2.50" (01/08/18) 45 FLOGARD LTPw/SEAL ASSY, D= 2.37" (12/01/14) SL JARRED LTP UP HOLE (03/05/15) & IT IS NO LONGER STUNG INTO DEPLOYM ENT SLEEVE TOP OF 7" LNR 8900' 1 /2" TBG, 12.6#, L-80..0152 bpf, D = 3.958" 8963' 9-5/8" OSG, 47#, L-80, ID = 8.681" 9396' 3-1/2" LNR, 9.'4 L-8.992"0 STL, 9446' .0087 bPf, D=2 1 7" LNR, 26#, L-80, .0383 bpf, D = 6.276" 1 P3iFORATION Sl1NTM Rt3=LOG:BAKB2RFMONI !18/14 ANGLEATTOPPERF: 89° 10713' Note: Refer to PoducBon DB foP istorical pert data 1. 6"1 6 111623 - 118481 O ST MD TVD DEV TYPE VLV LATCH PORT DATE 12 2936 2935 6 CAM DONE RK 16 01/09118 11 5108 4810 39 CAM OM1' RK 0 01/04/08 10 6320 576 39 CAM SO RK 20 01/09/18 9 6471 675 39 CAM OMY RK 0 04/06/07 8 7140 6408 36 CAM RK 0 12/05/98 "7 7284 6525 35 CA *DMY RK 0 01/09/18 6 7689 6863 32 DMY RK 0 12/11/01 5 7839 6991 32 CAM DMY RK 0 12/05/98 4 8235 7334CAM DMY RK 0 12/05/98 3 8370 7455 26 CAM DMY RK 0 12/05/98 2 8518 75X 26 CAM DMY RK 0 12105198 Ljj 8668 T124 25 CAM I DMY I RK 1 0 112111101 'STA 97A BnE DE37 PKG x NP, U = 2313- (01Mkil 5) X 5-1/2" BOT 3-H PKR, ID = 4.75" X 4-1/2" XO, D = 3.958" JII Utl UY SLV w/4-1 r r,U=J.UU- PLUG BUSFNG @ 8883' MLLED TO 2.80" (9/ OTIS X NP, D = 3.813" (BEHIND PIPE) HFSX NIP. D=2.813" OTIS XN NP, MILLED TO 3.80" D WLEG, D=3958" BEHIND R LOG?? PIPE LTPw / SEAL ASSY. ID = 1.80" !11/30/141 9311- 112./9- UL) X 18- UAL FVKI W 5LV, U=2.J/( 9313' 2.70" DEPLOY SLV, D= 225" VVIPER PLUG BUSHING CM- 9324', ID = 1.78" 1 9446- h 3-112- X 3-3/16- XU, U = 2.785- (BE 7" LNR MLLOLI T WINDOW (G -15B) 9528' - 9536' MILLOUT WINDOW (G -15C) 9811' - 9816' 11322' H2-3/8"PUPJ0NTw/RAPPTAG DATE REV BY COMMENTS DATE REV BY OOM IENTS 11130181 VAN 3 ORIGINALCOMPLETION 02/20/18 CJWJMJ PULLED DBSSV RUG (02/19118) 08108/98 C CTD SIDETRACK (G -16A) 03/21/19 MES/JADPERFS(03/10/19) 05/31108 C CTD SIDETRACK (G -1151B) 10121/14 C CTDSIDETRACK(G-15C) 02/19/18 DG/JM) SET DSSSV PLUG (02/07!18) 02/19/18 KP/JMD TREEC(0(02/09/18) P' UDHOE BAY UNIT WELL: G -15C PERlJ1T No: F1141260 AR No: 50-029-20647-03 SEC 12, T11 N, RBF, 1976' FSL & 227F FWL BP Exploration (Alaska) TREE= 6-3/8'CNV WELLHEAD = MCEVOV ACTUATOR= SH 3000 CMJ OKB. ELEV = _ 75.63' BF. ELEV = — - 40.93' KOP = 3100' Max Angle= 97°@10545' Datum MD = 9962' Datum ND = 8800' SS 20'X 30" COND, — 118' _N ID Minimum ID =1.78" @ 9324' WIPER PLUG BUSHING IN DEPLOY SLV UPPER 55KB STRADDLE PKR w /NS EXTE NDED PTEA (01/08/18) 13.70" BOT DEPLOY SLV w /4.50" OD SCOOP 1-1 8817' GUIDE & 3.00" D SEAL BORE TOP (1/08/18) LOWER55KB STRADDLE PKRw/45KB PKR 8830' GUIDE SHOE, D=2.50"(01/08/18) 45 FLOGARD LTPw/SEAL ASSY, 8838' D=2.37" (12101/14) SL JARRED LTP UP HOLE (03105115) & IT IS NO LONGER STUNG INTO DEPLOYMENT SLEEVE TOP OF 7" LNR H 8900- 80,.0152 900' 80,.0152 bpf, ID = 3.958" —8963' SG, 47#, L-80, D = 8.681' 9396' L12" LNR 9.29, L-80 STL, 9446' .0087 bpf, D = 2.992' VR 26#, L-80, .0383 bpf, D = 6.276" J—L 3-3/16" WHIPSTOCK (09/15/14) LNR 6.2#, L-80 TCI..0076 bpf, D = 2.80" ESTIMATED TOP OF CEMENT (10/17/14) PERFORATION SUM MARY REF LOG: BAKER RPM ON 10/18/14 ANGLEAT TOP PERE 89' @ 10713' Note: Refer to Production DB for historical perf data SIZE', SPF INTERVAL OprVSgz SHOT SOZ 1.56 6 10713-10745' O 103/10/19 11.56" 6 11258-11423 0 1110/19/14 1.56 6111623 - 11848 0 110/19/14 ' LNR 4 7#. L-80 TH-511. 0039 bnf D = 1 995" G.15CSAFETY 34 @110546T-PREVIOUSWELLBORES INOTSHOWN DOGLEG- G.1 E� CAUTION PULL14G 35 KB LTRSLV MAYBE WEDGED ON LOCATOR - COULD DROP @ SURFACE ^" O 2050' 5-12" OTIS ROM SSSV NP, D = 4.562" GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 12 2936 2935 6 CAM DONE RK 16 01/09/18 11 5108 4810 39 CAM DMY RK 0 01/04/08 10 6320 5758 39 CAM SO RK 20 01/09/18 9 6471 5875 39 CAM DW RK 0 04/06/07 8 7140 6408 36 CAM ONY RK 0 12105/98 "7 7284 6525 35 CAM 'DMY RK 0 01/09/18 6 7689 6863 32 CAM DIVY RK 0 12/11/01 5 7839 6991 32 CAM DMY RK 0 12/05/98 4 8235 7334 28 CAM OW RK 0 12/05/98 3 8370 7455 26 CAM DMY RK 0 12/05/98 2 8518 7588 26 CAM DMY RK 0 12/05/98 1 18668ITT241 25 1 CAM I DMY I RC 1 0 112111101 "STA #7 = EXTENDED PKG 8738' H 5-12" BKR L SLD SLV. D=4.562' SEAL ASSY XNP, ID = 2.313" (01108118) X 5-12' BOT 3-H PKR, ID = 4.75- X 4-1/2' XO, D = 3.958" 1 3./U'" C I I UtJ-LUr ALV W /4- lis FWUH, U= 3.UU- WPER PLUG BUSHNG @ 8883' MILLED TO 2.80" (911/14) 8922' 4-12" OTIS XN NIP, MLLED TO 3.80" D 8963' 4-1/2"WLEG, D=3.958" BEHIND 8964' f3MO TT LOG 77 PIPE 93� 35 KB LTPw/SEAL ASSY_D=180"(11/30/14) UA 10 UAL FVKI EU 5LV, U=2.3/ EPLOY SLV, D= 2.25" PLUG BUSHING @— 9324', ID =1.78" 13-1/2" X 3-3/16" XO, D = 2.786" (BEHIND PIPs I T LNR MLLOUT WIDOW (G -15B) 9528' - 9536' I MLLOUT WNDOW (G -15C) 9811' - 9816' I I PBTD I DATE 1 REV BY COMMENTS DATE REV BY COMMENTS 1, 11130181'1 VANS ORIGINAL COMPLETION 0220/181 CJN/JMD PULLED DSSSV PLUG (02119118) 08108198 NORDIC 1 CTD SIDETRACK (G -15A) 03211191MSS/JMD ADPERFS (03/10/19) 05/31/08 NORDIC I CTD SIDETRACK (G-158) ",. 04/10/191 DD/JMD+ ELEV & CONDUCTOR CORRECTIONS 1021114 NORDIC 1 CTD SIDETRACK (G -15C) 02/19/18 DG/JMD! SET DSSSV PLUG (02107/18) 02/19/18 KP/JMD ITREE C/O (02/09/18) w GBP PRUDHOE BAY UNIT WELL: G -15C PERMIT No: 2141260 API No: 50-029-20647-03 SEC 12, T11 N, PIT 3E, 1976' FSL & 2276' FN BP Exploration (Alaska) • RECEIVED STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS FFR 71 7018 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate ❑ Pull Tubing 0 Operationsp tt P1 00 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change A r P a ‘-'0"❑ Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:Mill Plug-CIBP 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 214-126 3. Address: P.O.Box 196612 Anchorage, Development Iia Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20647-03-00 7. Property Designation(Lease Number): ADL 0028280 8. Well Name and Number: PBU G-15C 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 11889 feet Plugs measured None feet true vertical 9025 feet Junk measured 11548 feet Effective Depth: measured 11548 feet Packer measured 8833 feet true vertical 9024 feet Packer true vertical 7863 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"x 30" 38-118 38-118 Surface 2635 13-3/8" 37-2672 37-2672 5380 2670 Intermediate 9362 9-5/8" 34-9396 34-8385 6870 4760 Liner 628 7" 8900-9528 7925-8511 7240 5410 Liner 3015 3-1/2"x3-3/16"x2-3/8" 8873-11888 7900-9025 10160/NA/11200 10530/NA/11780 Perforation Depth: Measured depth: 11258-11848 feet True vertical depth: 9021-9025 feet Tubing(size,grade,measured and true vertical depth) 5-1/2"17#x 4-1/2"12.6#L-80 32-8963 32-7982 Packers and SSSV(type,measured and 5 1/2"BOT 3-H Pkr 8833 7863 true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): SCONE) / , Treatment descriptions including volumes used and final pressure: s, 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 290 24433 9 40 260 Subsequent to operation: Not Available Not Available Not Available 40 720 14.Attachments:(required per 20 AAC 25.070.25.071,&25.2831 15.Well Class after work: Daily Report of Well Operations 0 Exploratory 0 Development 0 Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 0 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Oshiro,Joleen Contact Name: Oshiro,Joleen Authorized Title: G Pad Engineer/New Wells Delivery PE(GC1/FS3 Contact Email: JOLEEN.OSHIROt bp.com Authorized Signature: ?�-i Date: �/Z " " f l Contact Phone: +1 907 564 4606 Form 10-404 Revised 04/2017 V 3// / / 7) Submit Original Only • • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report Of Sundry Well Operations (10-404) February 16, 2018 To Whom it May Concern: Attached please find the Report Of Sundry Well Operations for Mill CIBP Plug for Well PBU G-15C, PTD #214-126. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska) , Inc. P.O. Box 196612 Anchorage, AK 99519-6612 • • > 0 H 01 CO 0) a) \ \ \ \ Cs N-5 R3 R3 R3 R3 R3 Li o o o o o o 0 m « c m = co / H m 2 G ! 7 E o : 7 2 0 : K o : 3 0 # : : 3 0 -I, \ \ ° / \ \ % g / = \ 4t \ \ * o C gt \ \ C \ \ K \2 / * \ /70 _ \ / f $ gg $ _\ / a ° co \ ° 6 ° \ a ¥ \ H — H \ / § $ o r,.,"'' \ - -o f R \ - / j 0- % . ƒ ® \ o = o o = o e o 2 0 0 _• f o %9 E \ 9 9 co » ~ 5' a § m e E / ! f e / * / _ \ c__ : O $ o / \ 2 \ 0 CY E -, 00 e o = —, - o = -- _ cn = b ] Cr _t 7 3 s ■ f 7 - a 2 7 J a ® ° ® / $ / j $ o -. r I \ o ,- 19 o $ 0 y m 0 e m o W 47 f \ \ : f2 / —s f\ m _ = m = \ � e � CD \ ECO f \ E « � < CD 0- CO � 2 o= = oe —CO g3 O5 � \ O5 "V -1 ± S \ g « \ ƒ e = 0 0 E : o - co _ ® I c) _ w 5 CO H 5 — ` / $ CO 9 \ § 2 -11 CL / - SDN) f � D ¢ < ( k cr m -* _ N ' N = 0_ @ CD E ° J \ ° E * CD & E — & � � � / R \ U) C.) 5w 0 - o �Er (31 x E . - / C 0 � � 0co� � _ / � f 3 � 9y _ - _. 11) 2 8 0 9 o 9 90 / \ -< 0 ] _ ] m E _ _. = J e o c e o & 5- < � @ C) C) .--'- o - C CD- C % \ 7 = 7 = ET o e ® A- ® x © E --I g / \ 2 / \ g ± 7 e. m a m ' _ _. _ 0 m 0 0 = O J® oJ o /* E I \ / / \ / / \a c CO o § © O § (CI \ ec 5 7 0 H & 0 J= c5e C5e A -2. ] a) ] a) \ a cl, NJ \ \ CD- \ ƒ ° R ° @ R C § C = 2 TREE= 6-3/8"CAN SAFETY All WELL ANGLE>70"@ 10176'"""MAX DOGLEG: 1M1IB_1}SAD= MClV OY . G-1 5 C 34'@10545'...PREVIOUS WEI.LBORES NOT SHOWN'"USE ACTUATOR= OTIS B- a•"4: CAUTION PULLNG 35 KB LTR-SLV MAY BE WEDGED ON LOCATOR OKB.ELEV= 75.63' I I COULD DROP @ SURFACE*** BF.ELEV= 41.79' KOP— 3100' Q , 2050' H5-1/2"OTIS ROM SSSV NP,D=4.562" GAS LIFT MANDRELS Max Angle= 97°e 10545 I. ST MD TVD DEV TYPE VLV LATCH PORT DATE Datum MD= 9962' 12 2936 2935 6 CAM DOME RIC 16 01/09/18 Datum TV D= 8800'SS 11 5108 4810 39 CAM DMY RK 0 01/04/08 CONDUCTOR #, ,D= " ? 10 6320 5758 39 CAM SO RK 20 01/09/18 9 6471 5875 39 CAM DMY RK 0 04/06/07 9-5/8"CN PKR —1 2621' 8 7140 6408 36 CAM DMY RK 0 12/05/98 13-3/8'CSG,72#,L-80,D=12.347' H 2672' "7 7284 6525 35 CAM "DMY FSC 0 01/09/18 6 7689 6863 32 CAM DMY RK 0 12/11/01 5 7839 6991 32 CAM DMY RFC 0 12/05/98 Minimum ID = 1.78" @ 9324' 4 8235 7334 28 CAM DMY RK 0 12/05/98 WIPER PLUG BUSHING IN DEPLOY SLV 3 8370 7455 26 CAM DMY RIC 0 12/05/98 2 8518 7588 26 CAM DMY RK 0 12/05/98 1 8668 7724 25 CAM DMY IRK 0 12/11/01 UPPER 55KB STRADDLE PKR w/NS —j 8803' "STA#7=MENDED PMEXTHVDED PISA(01/08/18) I I 8738' —15-112'BKR L SLD SLV,ID=4.562" 5-1/2"TBG, 17#,L-80,.0232 bpf,CI=4.892" H 8803' 0=� =4 8803' j---IBOT PBR TBG SEAL ASSY 3.70"BOT DEPLOY SLV w 14.50"OD SCOOP --I 8817' MI�t I 8829' ---12-7/8"X NP,D=2.313"(01/08/18) GUDE&3.00'1D SEAL BORE TOP(1/08/18) OM81 E� 8833' 9-5/8"X 5-1/2"BOT 3-H PKR ID=4.75" LOWER 55KB STRADDLE PKR w/45KB PKR 8830' 10.-t1 `'''' ..1 ? -15-1/2"X 4-112'XO.ID=3.958" GUIDE SHOE,ID=2.50"(01/08/18) 45 FLOGARD LIP w/SEAL ASSY, 8838' 8873' —{3.70"BIT DEPLOY SLV w!4"GS PROF,D=3.00" 0=2.37"(12/01/14) 11 WFER R-UG BUShNG @ 8883'PALLED TO 2.80"(9/1/14) SL JAMB)LTP UP HOLE(03/05115)&IT IS NO 8879' —14-1/2"OTIS X NP,I)=3.813'(BBIIND PIPE) LONGER STUNG INTO DEPLOYMENT SLEEVE --18$92' H3-1/2*HES X NP,I3=2.813" TOP OF 7"LNR H 8900• 8922' H 4-1/2"OTIS XN NP,BALLED TO 3.80"ID 4-1/2"TBG,12.6#,L-80,.0152 bpf,D=3.958^ 8963' i- ' 8963' 4-1/2'WLEG,D=3.958" BEHIND 19-5/8"CSG,47#,L-80,D=8.681" 9396' ► " 8964' H B.MO TT LOG?? PIPE 3-1/2"LNR,9.2#,L-80 STL, — 9446' trst I I 04' 9304' --135 KB LTPw/SEAL ASSY,D=1.80"(11/30/14) .0087 bpf,0=2.992" "'t ►+�'A tra Ff 9311' —2.79'ODX18"OALSLV,D=2.37(11/30/14) 181r STOCK 9624' ►,%" 9313' —2.70"DEPLOY SLV,D=2.25" 7'LN R,26#,L-80,.0383 bpf,13=6.276' H 9624' 110 WIPER PLUG BUSIING @—9324',ID=1.78" 3-3/16'WHPSTOCK(09/15/14J-_9811' 3-3/16'LNR,6.2#,L-80 TCI,.0076 bpf,D=2.80" H —9815' 9946' H 3-a/2'X 3-3/16'XO,0=2.786"(BEHIND PIPE) PST A IATTOP Of CEMENT(10/17/14) —I —10130 7"LIC MLLOUT WINDOW (6.158)9528'-9536' FERFORATION SUANAARY full LOUT WINDOW (G-15C)9811'-9816' FEE LOG:BAKER RPM ON 10/18(14 ANGLE AT TOP PERF: 'ri 11258' 10946' H2-3/8"PUP JONT w i RA PP TAG Note:Refer to Ftoduction DB for historical pert data SIZE SPF t'I1U'WAL Opn/Sgz SHOT SQZ ; 11322' —12-318"PUP JOINT w/RA FF TAG 1.56" 6 11258-11423 0 10/19/14 1.56' 6 11623-11848 0 10/19/14 ' 11648'CTM HFISH:2-3/8'CIBP(01/26/18) 1 1111 ,fit 11849' H Pam 2-3/8'LN2,4.7#,L-80 TH-511,.0039 bpf, D=1.995' H 11888' g DATE REV BY CONVENTS DATE REV BY COMFITS F1&Ul-OE BAY UNIT 11/30/81 VAN 3 ORIGINAL COMPLETION 01/23/18 ZV/JMD SET STRADDLE PATCH(01/08/18) WELL G-15C 08/08/98 NORDIC 1 CTD SIDETRACK(G-15A) 01/23/18 BSE/..IND GLV C/O(01/09/18) PEWIT No: 2141260 05/31/08pIORDIC 1 CTD SIDETRACK(6-15B) 01/31/18 MSS/JMC PALLED CBF"SET FISH(01/26/18) API No: 50-029-20647-03 10/21/14 NORDIC 1 CTD SIDETRACK(G-15C) 02/08/18 CJMJMD CORRECTH)SSSV SEC 12,T11 N,R13E,1976'FSL&2276'FWL 12/04/14 SWC/PJC GLV CO 05/23/16 MRD'JMD SET CBP(05/19/16) BP Exploration(Alaska) • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Sunday,January 14, 2018 2:52 PM To: AK, OPS EOC Specialists;AK, OPS GC1 Facility OIL;AK, OPS GC1 Field O&M IL;AK, OPS GC1 OSM;AK, OPS GC1 Wellpad Lead;AK, OPS PCC Ops Lead;AK, OPS Prod Controllers;AK, OPS Well Pad EKG;Ak,Ops West Area TL;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr;Oshiro,Joleen; Regg,James B (DOA) Cr AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, GWO Well Integrity Well Information; AK, OPS FF Well Ops Comp Rep;AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey;Obrigewitch, Beau;O'connor, Katherine; Romo, Louis A; Sternicki, Oliver R; Tempel,Joshua;Worthington,Aras J;Wallace, Chris D (DOA) Subject: OPERABLE: Producer G-15C (PTD#2141260)Well barriers restored with tubing patch, MITs passed All, Producer G-15C(PTD#2141260)was originally made not operable on 02/02/16 for having TxIA communication through a leak near the packer. On 1/8/2018 slickline completed setting a tubing patch from 8805'-8830' MD covering the known tubing leak. The well passed a CMIT-TxIA to 2,553psi on 01/06/2018 and MIT-T to 2,611psi on 1/8/2018. The passing pressure test confirms that well barriers has successfully been restored. At this time the well is reclassified as Operable. Please note that coil will need to complete milling the CIBP in the liner before the well can be brought online. Please respond with any questions, Joshua Stephens Well Integrity Engineer Office: 907-659-8110 SCANNED Cell: 907-341-9068 WO Md.weft« e.diai is From: AK, D&C Well Int-• ' oordinator Sent: Friday, June 10, 2016 1:35 • To: AK, OPS GC1 Field O&M TL; AK, OPS 'SM; AK, OPS GC1 Wellpad Lead; AK, OPS GC1 Facility OTL; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; Cismoski, Doug • Daniel, Ryan; AK, GWO SUPT Special Projects; AK, GWO SUPT Slickline; AK, RES GPB East Wells Opt Engr; AK, RES GPB ; Wells Opt Engr; AK, OPS Well Pad DG; Oshiro, Joleen; 'Regg, James B (DOA) (jim.regg@alaska.gov)' Cc: AK, GWO DHD Well Integrity; AK, GWO Projects Well Integrity; AK,.• FF Well Ops Comp Rep; Morrison, Spencer; 'chris.wallace@alaska.gov; Hibbert, Michael; Janowski, Carrie; Montgomery, . J; Munk, Corey; Obrigewitch, Beau; Pettus, Whitney; Sternicki, Oliver R; Tempel, Troy; Worthington, Aras J Subject: NOT OPERABLE: Producer G-15C(PTD #2141260) Economic Evaluation Complet- 1 • • Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWelllntegrityCoordinator@bp.com> Sent: Friday, June 10, 2016 1:36 PM To: AK, OPS GC1 Field O&M TL; AK, OPS GC1 OSM; AK, OPS GC1 Wellpad Lead; AK, OPS GC1 Facility OTL; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Superintendent;AK, D&C Wireline Operations Superintendent;AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; AK, OPS Well Pad DG; Oshiro, Joleen; Regg,James B (DOA) Cc: AK, D&C DHD Well Integrity Engineer;AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Morrison, Spencer; 'chris.wallace@alaska.gov'; Hibbert, Michael;Janowski, Carrie; Montgomery, Travis J; Munk, Corey; Obrigewitch, Beau; Pettus, Whitney; Sternicki, Oliver R;Tempel, Troy;Worthington, Aras J Subject: NOT OPERABLE: Producer G-15C (PTD #2141260) Economic Evaluation Complete All, Producer G-15C(PTD#2141260) did not flow during the well test for economic evaluation.The well is reclassified as Not Operable.The well is secured with a CIBP. Work Completed: 1. E-line: Set CIBP at 9390' MD—DONE 05/19/16 2. Operations: POP well for economic evaluation—DONE 05/22/16; did not flow 3. DHD: Monitor WHP's—DONE 06/10/16;T/I/O = 190/190/Vac 4. WIS: Reclassify as Not Operable—DONE 06/10/16 Thanks, Adrienne McVey Well Integrity Superintendent—GWO Alaska (Alternate:Jack Lau) SCANNED JUN 1 7 2016 Office: (907)659-5102 Email: AKDCWellIntegrityCoordinator@BP.com From: AK, D&C Well Integrity Coordinator Sent: Friday, May 211;2016 10:48 AM To: AK, OPS GC1 Field O&M TL;AK,_,OPS GC1 OSM; AK, OPS GC1 Wellpad Lead; AK, OPS GC1 Facility OTL; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; AK, OPS Well Pad DG; Oshiro, Joleen; 'Regg, James B (DOA)-(jim.regg@alaska.gov)' Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Morrison, Spencer; AK, D&C Well Integrity Coordinator; 'chris.wallace@alaska.gov'; Hibbert, Michael; Janowski, Carrie; Montgomery, Travis J; Munk, Corey; Obrigewitch, Beau; Pettus, Whitney; Sternicki, Oliver R; Tempel, Troy; Worthington, Aras J Subject: UNDER EVALUATION: Producer G-15C (PTD #2141260) Economic Evaluation All, Producer G-15C (PTD#2141260) has a history of TxIA communication when shut in. A leak detect log on 12/03/14 indicated a leak at the production packer.The well has two liner top packers. The planned repair for the production 1 • 1110 Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWelllntegrityCoordinator@bp.com> Sent: Friday, May 20, 2016 10:48 AM To: AK, OPS GC1 Field O&M TL; AK, OPS GC1 OSM; AK, OPS GC1 Wellpad Lead; AK, OPS GC1 Facility OTL; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr;AK, OPS Well Pad DG; Oshiro,Joleen; Regg, James B (DOA) Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Morrison, Spencer; AK, D&C Well Integrity Coordinator; 'chris.wallace@alaska.gov'; Hibbert, Michael;Janowski, Carrie; Montgomery, Travis J; Munk, Corey; Obrigewitch, Beau; Pettus, Whitney; Sternicki, Oliver R; Tempel, Troy; Worthington, Aras J Subject: UNDER EVALUATION: Producer G-15C (PTD #2141260) Economic Evaluation All, Producer G-15C(PTD#2141260) has a history of TxIA communication when shut in.A leak detect log on 12/03/14 indicated a leak at the production packer.The well has two liner top packers.The planned repair for the production packer leak was to pull the uppermost liner top packer, and replace it with an extended liner top packer designed to straddle the leak, but a 2015 attempt to retrieve the liner top packer was unsuccessful. On 05/19/16, E-line set a CIBP isolating all perforations.The plan forward is to POP the well Under Evaluation and obtain well tests, in order to determine whether gas is leaking by the liner top packers.This will help determine accurate formation gas rates, and determine whether the well has future utility. The well is reclassified as Under Evaluation. Plan Forward: 1. E-line: Set CIBP at 9390' MD-DONE 05/19/16 2. Operations: POP well for economic evaluation 3. DHD: Assist Operations with POP Please reply if in conflict with proposed plan. Thanks, Adrienne McVey Well Integrity Superintendent-GWO Alaska (Alternate:Jack Lau) Office: (907)659-5102 Email: AKDCWellIntegrityCoordinatorPBP.com From: AK, D&C Well Integrity Coordinator Sent: Tuesday, Februar-� 20.16 11:52 AM To: AK, OPS GC1 Field O&M TL; AK OPS GCl OSM AK, OPS GC1 Wellpad Lead; AK, OPS GC1 Facility OTL; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; Cismoski, Doug-A; Daniel, Ryan; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; AK, RES GPB'Ea-Sr-Wells Opt Engr; AK, RES GPB West Wells Opt Engr; AK, OPS Well Pad DG; Hidalgo, Ramon; 'chris.wallace@alaska.gov' 1 • Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Tuesday, February 02, 2016 11:52 AM To: AK, OPS GC1 Field O&M TL;AK, OPS GC1 OSM; AK, OPS GC1 Wellpad Lead; AK, OPS GC1 Facility OTL; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent;AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; AK, OPS Well Pad DG; Hidalgo, Ramon; 'chris.wallace@alaska.gov' Cc: AK, D&C DHD Well Integrity Engineer;AK, D&C Projects Well Integrity Engineer;AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Sayers, Jessica; Dickerman, Eric; Regg, James B (DOA); Morrison, Spencer; Pettus, Whitney; AK, D&C Well Integrity Coordinator Subject: NOT OPERABLE: Producer G-15C (PTD #2141260) Sustained Inner Annulus Casing Pressure over MOASP All, Producer G-15C (PTD#2141260)failed a warm TIFL post POP on January 31, 2016, demonstrating a lack of competent barriers downhole. At this time the well has been reclassified as Not Operable, and has been shut in and isolated. Please call with any questions. Laurie Climer (Covering for Kevin Parks) BP Alaska-Well Integrity Coordinator Gth. WIC Office: 907.659.5102 WIC Email: AKDCWeIlIntegrityCoordinator@BP.com From: AK, D&C Well itegrity Coordinator Sent: Sunday, January 17, 20-16_7._:47 AM To: AK, OPS GC1 Field O&M TL; AK, OPS GC1 OSM; AK, OPS GC1 Wellpad Lead; AK, OPS GC1 Facility OTL; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; CismolZs i,-�Doug A; Daniel, Ryan; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; AK, RIES-GB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; AK, OPS Well Pad DG; Hidalgo, Ramon; 'chris.wallace@alaska.gov' Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity gineer; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Sayers, Jessica; Dickerman, Eric; 'Regg, James B (DOA) (jim.regq@alaska.gov)'; Morrison, Spencer; Pettus, Whitney Subject: UNDER EVALUATION: Producer G-15C (PTD #2141260) Sustained Inner An lus Casing Pressure over MOASP All, Producer G-15C (PTD#2141260) was reported to have sustained inner annulus casing pressure over MOASP on January 14, 2016. The pressures were confirmed to be TBG/IA/OA= 2310/2315/VAC psi on January 15, 2016. A subsequent cold 1 • i Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWelllntegrityCoordinator@bp.com> Sent: Sunday, January 17, 2016 7:47 AM To: AK, OPS GC1 Field O&M TL; AK, OPS GC1 OSM;AK, OPS GC1 Wellpad Lead;AK, OPS GC1 Facility OTL;AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan;AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr; AK, OPS Well Pad DG; Hidalgo, Ramon; 'chris.wallace@alaska.gov' Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity Engineer;AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Sayers,Jessica; Dickerman, Eric; Regg, James B (DOA); Morrison, Spencer; Pettus, Whitney Subject: UNDER EVALUATION: Producer G-15C (PTD #2141260) Sustained Inner Annulus Casing Pressure over MOASP Attachments: Producer G-15C (PTD#2141260) TIO Plot.docx All, Producer G-15C (PTD#2141260) was reported to have sustained inner annulus casing pressure over MOASP on January 14, 2016. The pressures were confirmed to be TBG/IA/OA= 2310/2315/VAC psi on January 15, 2016. A subsequent cold TIFL performed on January 16, 2016 failed on the overnight build up rate indicating a potential lack of two competent barriers in the wellbore. At this time,the well has been reclassified as Under Evaluation for additional diagnostics. Plan Forward: 1. Downhole Diagnostics: Cold TIFL—FAILED 01/15/16 2. Operations: Place well on production 3. Downhole Diagnostics: Warm TIFL 4. Well Integrity Engineer: Additional diagnostics as needed A copy of the TIO Plot has been included for reference. Please call with any questions or concerns. Thank you, SCANNED JUN 0 2, 2016 Whitney Pettus (Alternate: Kevin Parks) BP Alaska-Well Integrity Coordinator G WIC Office: 907.659.5102 WIC Email: AKDCWeIllntegrityCoordinator@BP.com 1 • Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWelllntegrityCoordinator@bp.com> Sent: Friday, October 09, 2015 7:01 PM To: AK, OPS GC1 Field O&M TL;AK, OPS GC1 OSM; AK, OPS GC1 Wellpad Lead;AK, OPS GC1 Facility OTL; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; AK, OPS Well Pad DG; Hidalgo, Ramon; 'chris.wallace@alaska.gov' Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity Engineer;AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Regg, James B (DOA); Rupert, C. Ryan; Pettus, Whitney; Sayers, Jessica; Dickerman, Eric Subject: OPERABLE: Producer G-15C (PTD# 2141260) No IA Repressurization All, Producer G-15C(PTD#2141260)was placed on production September 29, 2015 to monitor possible tubing by inner annulus communication. On October 04, 2015 pressures were confirmed to be TBG/IA/OA= 250/450/370 psi. On October 09, 2015, prior to the tubing being shut in and stacked out,the IA was found to be 470 psi. The well remained shut in for one hour with TBG/IA/OA= 2340/480/450 with no signs of fluid level or pressure movement in the inner annulus. The well previously passed a MIT-IA to 2500 psi on December 02, 2014 indicating two competent barriers in the wellbore. At this time,the well has been reclassified as Operable. Please call with any questions or concerns. Thank you, Whitney Pettus -.--- (Alternate:Kevin Parks) BP Alaska-Well Integrity Coordinator G WIC Office: 907.659.5102 SCANNED AUG 0 4 2916 WIC Email: AKDCWellIntegrityCoordinator@BP.com From: Ate, D&C Well Integrity Coordinator Sent: Monday, September 28, 2015 9:06 AM To: AK, OPS GC1 Field O&M�TL- AK,OPS GC1 OSM; AK, OPS GC1 Wellpad Lead; AK, OPS GC1 Facility OTL; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; AK, RES GPB East Well Opt Engr; AK, RES GPB West Wells Opt Engr; AK, OPS Well Pad DG; Hidalgo, Ramon; 'chris.wallace@alaska.gov' Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Inte Engineer; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Morrison, Spencer; Cinelli, Steven; Regg, James B (DOA) (jim.regg@alaska.gov) Subject: UNDER EVALUATION: Producer G-15C (PTD# 2141260) Evaluate IA Re-Pres3urization All, i • • Wallace, Chris D (DOA) From: Wallace, Chris D (DOA) Sent: Monday, September 21, 2015 8:26 AM To: 'AK, D&C Well Integrity Coordinator' Subject: RE: G-15C (PTD#2141260) Monitor for inner annulus repressurization Kevin, I overlooked this so thank you for the reminder. The plan below, including up to 28 days production, is approved. Thanks and Regards, Chris Wallace Sr. Petroleum Engineer Alaska Oil and Gas Conservation Commission 333 West 7th Avenue SCANNED JUN 0 12016 Anchorage,AK 99501 (907)793-1250(phone) (907)276-7542(fax) chris.wallace@alaska.gov CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Chris Wallace at 907-793-1250 or chris.wallace@alaska.gov. From: AK, D&C Well Integrity Coordinator [mailto:AKDCWellIntegrityCoordinator@bp.com] Sent: Friday, September 18, 2015 1:15 PM To: Wallace, Chris D (DOA) Subject: FW: G-15C (PTD #2141260) Monitor for inner annulus repressurization Chris, Just checking to see if you had a chance to look at this one yet? Thanks, Kevin Parks (Alternate Whitney Pettus) BP Alaska-Well Integrity Coordinator G �A Global Wells �/�/ Organization Office: 907.659.5102 WIC Email:AKDCWelllntegrityCoordinator@bp.com From: AK, D&C Well Integrity Coordinator Sent: Sunday, August 30, 2015 11:22 AM To: 'chris.wallace@alaska.gov' • Cc: AK, D&C Well Integrity Coordinator Subject: G-15C (PTD #2141260) Monitor for inner annulus repressurization Chris, As per our conversation, producer G-15C (PTD#2141260) is a natural flow well that has possible tubing x inner annulus communication by the packer. BP would like to bring well on line for up to 28 days and monitor the inner annulus pressure.The well passed a CMIT T x IA to 2500 psi on 12/3/2014 and a MIT-IA to 2500 psi on 12-02-14. If we find that the well has inner annulus communication the plan will be to have coil to replace the liner top packer and replace it with an extended liner top packer. If permission is granted to produce the well for diagnostic evaluation, the inner annulus pressure will not be actively managed with the exception of compensating for annular fluid expansion while the well is reaching a thermally stable state. The inner annulus will not be allowed to exceed 2000 psi, and the outer annulus will not be allowed to exceed 1000 psi. If either of these pressures are reached during the well tests after the well is thermally stable the well will be shut in and well tests will be terminated. I have enclosed a copy of the wellbore schematic for reference. Thank you, Kevin Parks LA(ternoteWhitney Pettus' BP Alaska-Well Integrity Coordinator Global Wells Organization Office: 907.659.5102 WIC Email:AKDCWellintegrityCoordinator@bp.com 2 • Gyrodata Incorporated • 23000 Northwest Lake Dr. gyro/data Houston,Texas 77095 Precision Wellbore Placement T:(281)213-6300 • F: (281) 213-6301 2 1 4 1 2 6 26177 SEP 01 2u SCANS JUN 0 8 2016. SURVEY REPORT BP Exploration Drill Site G-Pad #G-15C Wellhead Prudhoe Bay, North Slope Borough, AK AK0215GCM110 10 Feb 2015 RIGHT PLACE FIRST TIME www.gyrodata.com Gyrodata Incorporated gyro/data 23000 Northwest Lake Dr. Houston, Texas 77095 Precision Wellbore Placement T: (281) 213-6300 • F: (281) 213-6301 August 28, 2015 State of Alaska - AOGCC Attn: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 Re: Drill Site: G-Pad, Well #G-15C Prudhoe Bay, Alaska Enclosed, please find one (1) copies, and one (1) disk of the completed survey for the above referenced well. We would like to take this opportunity to thank you for using Gyrodata, and we look forward to serving you in the future. Sincerely, Kelly Landram Senior Operations Assistant RIGHT PLACE FIRST TIME �$( I www.gyrodata.com • • C 0 .- 5 y c� U 0 o5 -0 vas .1 o a) ax 0 .4 3 x o 0 3 c v o x ct 0 cc) r'4 o x > `r? W N vro U C 05 O 'nom C CD •. Q o a> C4 U � a> o ct Z ° NN C O W- . a 'C o w ¢ 3 o QCQ > U x •Y gU w ac�� Q Q w ›. Q., d C7 o F4 w 3 0 x o > ,Q• o Z'-. co x C7 o N ¢ aC C N C l--- ct 2 7 U o 5-o o F.., U o r o •U U S bb o 'n cct °' o a a � om. N N 0 o mi ' Za o U a ' � k.,,cs N N Q .°..) 8 o `.� aoi � o hi 2-4Z ... 0 4- t -,-,6o . v9 ,-9 zQ a a4z Cl) U � OD 0 • N W wwwww 33www wwwww WW O .O 0' — ' 00 ONNwlm N crinh 00 .7% ,--, */..1 V1 O N � MmN MMMOn 00 1 ,ON „ ,0 --+ W O 00060. 000 ^, ^, NN NN NM O a) Z G7 00 V] C/] V1 V] V] C/1 C/1 . 00 . . V1 V1 O O O 000 '0 M Q NmcO, 0, 00NO +n '-+ 0 M- O O .0 N N wl N –, 0 ,.0 '0 M O – N N Z U 0 00 – N M m- vi 0 '0 ' '0 '0 Z E-+ O o, r.— o .000 -+ Ntn4N11.1 fid. et O 16 �1'.O N 'n moi' m N – N M 00 'O 0\ O vO M aI 0 rY N N N00 00 N N '0 'O k. .n �n '0 to .n r- „� .-. .-. . .-+ - .--i ,-, .-, .-. r-+ .-� ,--+ .... .-+ .- .-, .... V] el NO M 0o 0o N v m — O N C\ s Vo '.o �n � 00 ON O . O 00 – m 4t. 61/461/46 ,0 ,0 .0 ,0 ,0 "0 .0 N U EI VD A VD m a N O U x O Lr, 00 O, O, 00 00 N N b ' >O \O b ,0 .,-) o 070 000. 06) o, o). o0, 0, 0, 0. 0, 0, 0, H a+ 1..) 000, 0, 6, a, 0\ o, o. o, o, o, 0, 0. 0. c. c. .> r:4 L4 Li—,+ Gax —' NNM ' kn ,0N0oo, O ,- Md41 + N - ,0 Q .-. .- CD Q 0 Qo ,., O C7 F., v, Q 0 • r, N � N � 0. O\ NCN C� l00 --+ .000 ,-, M "Ci 4 .1 = bA� O Z fl ,O -� d v1 0 '.0 — N � •- .. +nN � NM O O O W -C O 66666 0 0 0 0 0 66666 0 0 v) ,.. Q Vs >" w C7 v; c4 > Uz 5 rr z x cn 0 �•/ a H O Or� w NMO, ,-, O, O, — NNO '.0 N0 .-• 0 — bb OH ooMd. () N c1 .1: ", — NNNoom MN O ,OMkn M 00, 00 �nN0. -- N 0 '.0 F-. 410000, - N N --i - --i � oONN � Oar 0 o0 W '-' 00 0 U U b4 O OZ -m .rD-. — NN N'� � en000 een 00 — N00 Z oc c4 � 60000 00000 © 00 pW ,4N Ox F" Za 0 g aF. Z 't wA O0 � � Q E" w py p., "Z }, 0 � � 00000 00000 00000 00 p-+ °� o 060 00000 00000 00000 00 P- U ;.4 (S� 4-+ 00 '"' Nen v) '.0 1 00 . 0 - N M .t +n ,OCA .- . .-. } • • M WWW WWWWW WWW33 33333 3333 * I 00 00 V) vO ,,O N N O V) a, ON O\ W C4 N )O ,n M 00 �O O � - 71: ,r) -� 0 0 00 0 0 O, a,. * k l W mm 4 kr; .n 4 4 M 6 .4S N * 0.6 M t.- N .D .-. N N E-+ -- M M 4 4 V) V) \p )O .Zc• c p 1-- N N cnvnvn vpvpcnVDvA � upu � � vpcnvptnv) cnvcn � QP4 OcrO N O O\ 00 N M 00 \O O) 00 a1N M N 'O Vl * M M-+ vn O 00 00 .O kn — M Cr, %.O �O N 7r 71: m. 71- NO M N N N U .-. — — * ,-. N N N 001/) V) Cr oo N v) N O )O 1n 00 N N •--, 0000 C N 'C N 00 M N \O * 06a; 408 ON d• -4 * 00 In M N * O O O� V'1 V) 4 4 M M 4 4 4 V) N Ch k.O kn kn kn V) V) 1/) 1/ Il) 4 - r. * * * NN NNNNN N N N N L4o, N 'QCNoo a — 1nNON N - 00N00 ."C �, L4 '.;,1cnNN00 0000000000 00 SIl)N -- — o4rn4 okr; t -- m 7r �r 1n N N UE-1 ciD Q VD cd a V> h v) cr M M M h- N N )D' * N C C C O U +, a1 D\ a) c., a, cr, O) a1 C' C 00 VD O a1 * h N C 071- NO .,- a� + y a;1 aaornN ) � ,-, � o knrnmoo aO1 a\ aO0) aO3Na) N a) — +, W 4-' N00O) ONM7r V) )ON0oO) O . * N NNNm O Q NNNNN NNNNN M M m m m M M M m Q O Cri• C7p L7H ct g) O If) N ' M )O a) '.0 )O M M )D.N O N v) t` O 00 r�, '.O N N d )O N: )O )O O 'd• w) * A M N O 00 V 00. N W U W 000 OOOOO OONNm riNNN N - N O H 0 O W O L/] In r~ W v F- O V) V) .0 = m00 a) - m71- Ns N N 00 0) 0, V) O a) n ,.0. 00. 1--- 71— \p Vl .-� 00 O Cr N O '.O M a) - 000, m ^> N - N M O N 0.6 M vi 7M N m m d 4 V) ooa\ * mN _ N00 ^ m cnNNNN NNNNN NNNN _ • WC-) I-� — N N N )O 00 O )O N ,-r M N )O v) M 00 �r O, v) W Q, U Ln V) V) kn M M V) M M V) O )O V. 1n N r - Ln •-. kn -. to 4 .� 6566 OOOOO O O M v) N O) O - - N N M M d' OW N • x WQ O � - x o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 p. p..( = E +, o00 00000 00000 ooOoo 0000 • 0 O 600 00000 00000 Como V) o1no1n a y o00 00000 Oo000 O v) NON v) NON WCd Z Q W 00 a) O * N M cr )O N 00 a) O * * * NN N N M M N O -n W Q * * N NNNNN N N N N M M M M M M m M M m W 0 zu et 3 33333 33333 33333 33333 00 00 ,.D O N N 00 ,.O Q\ v1 et ---:1- .4.) .71- 00 -, (:) ,71- ,c71-O et ,O et ciD N ,-, N 00 et - ^" M oo to v? t. N O O 7r O 00 CN M iW 00 et O )O N a; vS M O r vi M O a, 06 N NyO )D N • P N 00 C) CN O O ,- N c on '4v) VD N N 00 C) N N N N ze .,.. . c., N 2 ,2 O ,..., O et M 00 vl N O N M M O) N C O 00 N ,--, N N M 01 M N v 01 1 M ,--, 00 '.D M O 00 N l: 00 O N `O M-r+ W O C ,- er N O N tr; 00 ,--. et )D a1 N N O M VO O M cd N M M M et et et I- v') v) v) v) \D s.0 VO N St"-- 000.000 N O 00 N VDv) vn VD N 00 C1 N et v) VD N C1 O Q C) 0) 00 00 00 00 00 00 00 00 00 00 0) 0) 0) 0) 0) O) C6 Z e , d' �' , , 'd' rt' �t '- moi' ' d' '� 7t vl N N N N N N N N N N N N N N N N N N N N N )D CN V'1 et 0) V: ,� .--i M N M M k O r-- 00 ,-.. 00r-- 0 --' M6 00 00 N O �+ M O )D M O N et N6 00 )O et M N ^+ O O --+ ,-, Na.) a 00 a1 0, o N M et et I k.0 N 00 0) O ,--- N Met U .-, ,... ,-, ,-. .--� .--, - .-. ,- - N N N N N N CA Q CID R$ �-� < x ,--- N 00 M O V6 '0 (DN N N It) 00 00 '0 N v) O U E--i +.4 N 'd: v) vn v) vn et M O N M 0) M (-- Cr) o O 0T N M 00 .r, r i, a N N v3O400 (Ni 6 N ,- 400 ,-, et 00 -- MvOC) ,-- et VO 0) ,- M VO 00 .--, M v) 00 o Cl v) N 0) N et )O 00 r-+ ,-, f-y W -a M M M et et d' 7t In In v) In '0 'O �D �O 'D N N N N 00 C) ZW ^ M M M M M M M M M M M M M M M M M M M M M it '--I Q O al O H C. "al = z) a 1"'1 -O '0C') 00 lD N CO M N '0 .D O o 00 O 0 00 et N V ci -- c4 N v) N M O 0) -' N N 00 v) M et O N O N N Vn N W U W N ,--, ,---, ,--, ,--, N N N N N N M N M c,; (-,1M (-4M o HO 07:1 -='-, II ,4 QCA � z � w v H 00 0) 00 00 00 v) v1 Cl) 00 d' N Cl) ,- 00 v) v) N N v) et 00 00 C1 ,--, N '0et CON - NN 71: 0) NMN ,--, N ,--, - r-. [7] 0 v) In 'D 'O \0 N N 00 0) 0) o -- — N N N N N N N N .� et 4444 .4 et et 4 4 vn kn v) v) v) v) v) v) v) v) v) I-. N N N N N N N N N N N N N N N N N N N N N p4 O • --4 • Ur�-, /1 0) 00 \D CO O N v) N 00 N O o v) 0) '0 M et N 00 W V U a) N ,--. )D C, M N N N M N et 0 v) M C) N 71: 00071: N v') 4 ., 4v) vt v) )D )D N N 00 00 0) o O ,. N Cl) et et v) )O -- , . .-, ,--, r-, r. .-, . . . . . N N N N N N N N N N OW4N Q x d WQ 01-"VDU,-C) R! x O 00000 00000 00000 00000 p, p., E 0 00000 0o0oo 00000 00000 < N C0NO 0 N ON ON O W W kr) Nt) 0 N � ON NONkr) M Cl) et et et et v) )D N N C-- 1-- 00W00 a � O � c4 M M M M M M M M M M M M M M M M M M M M M mn F-� i-- �. rccFSw-irr I^--I • in 33333 33333 33333 33333 33 ,-, - N d' O 00 N D\ 0 00 O 00 77 00 d• oo O\ M d• ,-- •k4D O VD O 01 o M O1 kc00 d: r-' N d; o N N oo .-. \O •--- N M k-, W w00 00 O N d• 6 00 7h N O d• N vi O d• O; m 00 M H d' vl N 00 CN 0 ,-+ N d' v) VD 00 01 O N M v'1 V0 N CT o N I N N Cl N Cl M M M M M M M M '[h 'V' d' �T dr v1 ' p N NCS (+ zz otoov) v) oovnoo ov) ovto v) v) ovoo v) v) OO MOCO\ NO NONO\ ,--, -� ,-, 01d' V0 d' 01 - ONN O' N rr O d. O\ vl ,- N d: .-. O ,--- N d: VD o d' O\ d' -- N tr, N O r+a U O M O d' N ,-- Cr; M N -. kr; O d' 00 M 00 N N N N O1 O1 O O O - N N M M d' d' d' vnVD0 N N CD ,-, N M d' N .c N oo oo O1 01 O O r. N Cl Cl co! M M OOOOO OOOOO 00 --, -- - .- � ,- ,-- ,-, e V� �!1 „ V� „ 41 it1 V '11l- � '11kr)l � te1 vV l v1 l Ic1 ,(1Vr1 V' l t ) F--+ ..a v1 N N N N N N N N N N N N N N N N N N N N NN 00 on 01 00 00 N N v) VD O VD I N Cl 00 V0 VO 00 O d. 00 M ›n. O -4-+ M v'1 s.0 00 O m v'1 00 .. v) 06 N ,-. v'> O O \O 77 'C N N H G) %.O N 00 O1 7-, N M d' ,C) N 00 0 7-+ M d' VO N O\ O N min U i•-; CC-1.) N N N N M M M M M M M d- d• 7t d' d• df dr v( v) vn v) U] . O Q C Ct J xo N vn v) M 00 ,.. O\ 00 00 M 01 N o0 d' N s.0 M d' 0 01 r. O U .N N d, v) vn d' -, oo N l0 VD M ON M VD N N VO d' N00 V) „� 17,1 p. (i) d' ,000ON d' v) N000\ O ,ANN NNNNN .-. a Mv) NON d' V000oN v'1NQ\ ,--- M v'1NO\ ,--- M v) r- -4-. „/ f,7,� 4--i oo 00 0o Cr, O, O1 O, ON o O O O o. - ,-' Cl N N N ✓ (W. Q M M M M M M M M ‘l d '71- d' d' d' d' d' d' d' d- d <1-1- (1) 1t Q O CCS rr on V al = W t1 c M d' O O OP, 00 ON N Cr, M o '--, N 00 00 ,t N ,0 N O d' OrN ,Pm4 N N O v'1 d- N N N d. N 00 N O1 d' O N O d. �0. 0. --, O O 0 NNNNN NNMMN NNNNN N - --, O - -, HO Q W ▪ � z r-� W�� • v 00 - 00 r N N O N N O0 N M N N ,.O - vI N VO VO .�.r a ( 00 ON O VO vn d. vl d, d, d, d, d• M N O O1 CTO ^-) N N N N N N N N N N N N N N N N N N N ,--- ,-, N ,� vn v) v) V) v1 v) un v) V) v) v) vn v) v) vl V) v) V) V) vl v) N N N N N N N N N N N N N N N N N N N N NN / O W -- , 1 • v C.) p.4 Vp ,-. M vn N O, O\ vD d' d' d' N 0\ - N VO N d' ,� N s.0 W �r, U u ,,,, , ,, ,.. c, o0M ON d. NOT � ,--, ,.D ,-. 1 .001 -, d. tiL j ,.1 '0 N o0 0o OC O� O - N N M o d v'1 v6 '.0 N N N N o0 00 W N G N N N N N N M M M M M M M M M M M M M M mm <47 Oa C= 0 x 0 0 0 0 0 00000 00000 00000 0 0 Q., M E00000 00000 00000 00000 00 -< a +,N N O ' f OO OOO Wvr NNONNO NNNN � NON � N 000N0N0N0N 0000 - NN NNMMM Md im. W Q M M M M M M d' d' d' d- d' d' d- d' d' d' d' d' d' d' d• d• d' w 333 33333 33333 33333 3333 ,. 4 Cr, 00 ,.0 N CO N 4v:, M O M ken Nt N CT --, O -- O M a VD 01 N If V. ,1 1- vl 00 -- �t 00 M o0 'd' ,--i C' N N N oo O N i W N N N N N N N N06 M 00 d' CT .-. VON 06 4 O t` M M kn vp 00 (T --- N kn N 00 O -N M v) \C o0 01 -- M knkrIken en \O 'C N N N N N N N 00000000 p a) N O0 N ,.O 'Nt N ^" 0000 .-+ d- in M CT M N O M M NNCT CT d- t� 00 LO 7t N O t� N V N O 00 L-O M -N 00 M O t� M 01 kn w U NN v) O v) O v) CT 4 a1 4 00 co; 06 M t` N v6 00 00 CT Cr, O O — N N N M M 4 4 v) to t- N 00 r-+ .--. — ^- N N N N N N Cl N N N N N N N N N Cl Cl Mc 'd_ v) V 4 4 7 v) kr)l VO VD \O r-- t-- Q t- 00 00 00 CT v) kr) kr) kr) kr) V7 V7 v) v) v) v) � V) v) kr) v) � v) v) v) v1 __ N N N N N N N N N N N N N N N N N N N N N N CA0071: 0 V ,-- O O O .-. N CT M 00 MCT VO M .--. O O 4I N M CT 4 O sz; N 00 4 O v N 00 Ni NN t- 4 O N 4 -. 00 N lC o0 CT M NY VO (--- CT ,--i N kr) t-- CT O N ,1t kr) t-- 0, O 9 U [— + kr) v) VO VO VO \p \o VO N N N N t-- l 00 000 00 00 00 00 CT CA 64 C/] c W N vl l0 ON O 'd' 00 C' v) tr) 01 'O t-- CN 01 M \O ^-- 0 U CO -4 VO O iv) 00 O N M v) v) V M 00 v) Ne--- Nr.-- .,--, NNN..- H a N —, 66 oo [� t` vi M N --� O I-- t` v) M N O r,., CT M 4 k.O 00 O N 7r V 00 O N 7r VD t-- 01 M v) t, CT WW 4� N M M M M M v) Ln vl N kn \O LO \O � 1 � � � � dv 7/-1- 71-1—NTr �tvvcry 7rrry r Q M 0 p Z C H Ti W M = W c. — N 00 kkin00 ken M M 7h 00 M Cl M t- M 00 7r N \O 00 .--� 00 '71' N �t kr) M Crr dt N N M 1-- O O v) v) 00 VO kn VO CT Cl [W C7 000 —, 66 - - CC — C — o 00 ,. -. 6 ,... C.. in � z . w 64 Hr N 0 N , - ,.. MMOCTN� goo --, NNS C CN ) O --+ '-. N M V M V v) VDN 00 O ,-, N VD CT N �t N 0 N N N N N N N N N N N M M M M M M co; (,-; 44 W F-1 .c Vf Vf Vl Vf vl Vf vl Vn )f ) ) ) I ) v) V') Vf V') )n v) In In Vn In Vf hG '--i N N N N N N N N NNNNN N N N N N N N N N • Fri ~ r U �O N v) M NN CT 'ct 00 In o0 .--, O M O ---, 00 N In \O �O W `J a If \O , CT O — In CT CT CT N 'd, VO CT O 'tet VO vl CT M N kn 00 00 00 00 CT 01 CT CT CT CT O O O O NN N 4M M M M M M M M M M V 4 4 44444 4444 0W4 0 N Q x Q - Oup r ,0 fY x 000 00000 00000 00000 0000 P-, ~D F„4 i,_, 000 00000 00000 00000 0000 O ) NO � N N O ON NO N N NON N NW cn t Z Q) W 4i v d- vl vl In In VD VD VD VD N N N N 00 00 00 00 CT CN D, a � o4) WQ 71. 71- 71- <t7r7t �ry � � � � � '71- 71- 71- 71- 71. v1. 71- 1-71- N 3 33333 33333 33333 33333 00 N vn N Cr) Q1 v') VO N \0 VD O N -0 00 0o M oo Cr, Cr, 10 WCA ken a\ O 0, •-* N N N VO kn M N N --� O 01 00 W 01 kn NN M 01 40; 4c: 4 01 4 a, r 0, 4 O, - 00 M N _ N 7t Vn C-- 000 -0m N CNO N M kn C 00 00 00 01 01 O, 0 01 01 O O O 0000 * —. 00 -. 00 —, V] V] Vl V] C/] V] V] V] V] C/] V] Cl) C� C/� V] C/� Cl) C/) V] C/� C/� 00 O1 N s.0 7t - N M N N — N Q1 O M V0 O N O O I 000 * * O O\ 00 N VO M * 00 kO N N N 'O O U 0 • C\ C 06 OM M o0 3\ OO - - ^ NN M N N N N M M M M M M M M M M M M M M M M en O O * * N N M M ct 7t v) N N N r--- 00000, 0 N NNNNN N N N N N NNNNN N N N N M vl v) v) v) v/ kin v) v) v) v) v) v) v7 v) v) vl v) v) N v) v) N NNNNN NNNNN NNNNN NNNNN 0 -N 0, n O N N CNO0 - v) Q N v) 0 N v7 00 --, M ++ d' 00 N N o0 4 0 V) O V) -. vO --. N N N M 00 N N �t v) N C O N M \O 00 O --- M N O, O N M O U 4N Q\ CN 01 Cr) Ce, O O O O O O .--. ,--, * -r -N-, N N VD H V CC a W N \O k0 00 00 O O M N .--, M -, 01 ,--, v) N 00 N v) v0 O U } O 71- 00000 ,-, v) O kn N O 00 N 01 N 7t N O .00 171 a N 01 N vO 4 M M N N -. .- O O O O; 01 01 00 00 00 00 00 �, O N �t VO 0O O N kc 00 O Cl v) N Cr, M v) N O1 U W fW1 � 'e V� �t d' 1d' �f d1' 1-1- �V r 00000 H O Cd • 0 0 C.'7 W bA O m- m- N d' 10 N M �t O v7 ,t 00 v) 'd' n N — V) N N 7r I )n ,,O N N N 0000000 7' O n cn koo N )n W C�rry�`.J W N - N M N M N N O O O - 0 0 0 O'O O — Odd O H O W o a Q Uz vH — 01 1O oO , m .., = 0„, m ,„ „00 _ , . 0,,, , „ ,..) - r�-J+ bb In o0 --� M v) IN '1t 'd. 4 v1 VI 4-1 Vn l� 00 N 01 O Cr, O ' 71-..) .� vNi vv)i ) V V) V/ V/ V/ V/ ) vim) V/ V/ vii VI V/ )"'� N N N N N N NNNNN NNNNN NNNNN • O W -' W• U 0 M rn N v c v .-- 0 C 0000 0o0 01 0 N N 0 L : W C7 U L .., ... 4 = r4 -4`n ..a N N O O D1 00 00 00 00 00 00 N N N N 06 N N N N u V71- 71- 71-71- m M M M M M M M M M M M M M M M W W ^OO 00000 OOOOO 00000 OOOOO p.., a E xO 00000 00000 00000 00000 0 E"' 8v) CIfiO0 v viiOvO i1fi Cv0 O iOIikriOIiIi W Q� (S� 4C/D ray � ON1 O O O O O N * NNN N N eM M M end-72-1- 71.^• c O ^ ^ Ct v) In v) ken 4n Vn* * * NN In v) v) v) v) v) kr) v) In v) vn v) v) i 00 33333 33333 33333 33333 33 M M O vl - N Vl 0 00 - 01 N N 00 00 - V) \O 01 00 - N W V) N " .0 N N 00 0\ 01 - M t` �--, InO vl a M N N 00M W 00 M 00 M 06 M CO M 00 4 01 4 0 V"1 .- kD N N 00 M E„r rn N cr to N oo 0 M �t vC 00 0\ N � "n r oo O ,-• ^• NNNN NNMMm Mmmc - •:t- 71-1- 71- 71- tnLr p N NCS , vA vA v) rn rn va v) vp vp vn Cl) vn vp o vn vo vp vp vn vA Ari OO oo V) N M N 00 M 4 N 00 00 - : 4W .-� M - s-O 0 Oak rr1400 ,- M `C00 a, O O 0 000 Q M - 000 - 01 1-4 U C 01 M 'O a, N CO N 00 -. m vD 01 N-, -, -, NN d' N O N N k.D D N N N 000000 C O, O\ O O O O N N M M M M M M M M m m M crd' 71 ct t "1-Trr 0 - NN M M 71' v) '.O '0 N 00 00 C00 - - N M M M M M M M M M M M M M M M M M 'ch d' 'Ch 4 4 0 kin trl Vn Vn In Ln kin Ln Lin kin Vn Vn Ln Vl Vn kin kin kin Ln Ln to Vn N N N N N N N N N N N N N N N N N N N N NN CA kn N O M N 04r-- 04 01 'd' O \O M O, v 0 %.O N 00 vl ›-1 O m 00 4 Cr: 4 O Lin O VS N 00 M a1 4 O kci N N 00 O N kn lO 00 0, •--, M 4 ,CN 01 O N M V) �O W0 ,--, M4 \D t U • 4N NN .N-+ N m M M M M M 'c1' vt c1' c1' crV7 V7 Vl V1 N V1 CA M a ' V) -• -, ,-. ONN d' N \0 -• M .010000NN .7rm O U H oo VD -• 00 vl N 01 VD Cl 00 M 00 M IN ,-• VD -� VD ,. Vl 01 ,,,,i ^ N (� a O t` r"-: kr; 1n V'i eM M N Nk-..4 "• O O Cr; 00 --- MVDN01 MVl01 ... Ml- 01 _ MVl !� ON 0N ,� W4"' ^ '" - NNNNN MmmmM 'ctdPcl ,7 1t kkn o kn V'l In VI VZ Vl (n kin tin (n 'V7 4-) kr) kr) Vl V) V'1 kr) kr) (n 'n kr) Q O O M "'' n V) N (n (n ClVD 7 01 d, N, C 00 VD l"- O VD N N N Lin . M 00 VD l rVD 01 00 4 m d' O Vl m 0- Vl VD 01 -• •-r 00 ,. kr) N 0 kr) O (4 W v W 0 C) OOH. 66 6666 —, o • o -- o OOOOO OO •, H pO (D > 77$ '-' a Q c C to v? � .- H N 0D N 00 0 m m 1/4.D M .-• N ,.0 N 01 0 m N 01 00 b) -• M 0101 .-. N N '- N O M 0� 0rr O O N N Vl O N N N N 00 00 00 00 00 00 01 OD OD 01 01 O O O O O O O G) WJ .a Vl Vl Vl Vl vl Vl vl vl Vl Vl Vl Vl Vl Vl Vl .0 \D s.O s.D \O ,,O s.O N N N N N N N N N N N N N N N N N N N N NN O Q U 1--1 00000 N � CD00r. � ,-• 0001M --, 01 \D01r01 h W O U b�O ,O \D 0, O O, O O, 00 r• m Vl N N O O N N VD CO 01 O N tit() �7 ..) N N N 00 N 00 N N 01 0 00 00 00 00 00 1 00 00 00 00 00 01 01 M ._..� �• M M M M M M M M M M M M M M M M M M M M mm 0W4N (Q O f� x 00000 00000 00000 00000 00 p.., (z. o E H 0000000 (Doc)00 (Doc) 00000 o0000 00 VloviO (ioviovi 0Viovio viovio Vi ovi a O o O N VIN O N Vl N O N VI NO N V1 N O N Vl N O N W v9 +-MZ W 4 (n vl Vl vl VD %.D VD N N r-- r--- 000000 00 01 01 01 a1 00 a M O W nn V ' Il Vl vl vl 1n (n (n vn v l ( l Vl 'nn (ID V1 vl.(n (n k-0 "O • 333 33333 33333_ 4-- 3333 00 Mm O v) M N O .--i vn v7 -. M N t VD Cr, CN VD a C/j Cr VOM Cr001; V0 7t N000 'O M0N 0 IO -- VD W 4 O �O N t- MCr; V'1 N M06 4 O t` M06 d" 0, vi M v) vO 00 Cr0� N - o N Cr, o N 4 t` oo O - M 4 VD kn In vl kn \O \O .O t` t` t- t` N N 00 00000000 p N N O 0 )--.. m 01---- ,--, N6 N M \Q N Ii Q, N l C1 M N N ...I O N o0 C O vl C d; 00 N 671: [--- -• d- t O M k.O �-4 U 0 M v) 00 o M l0 00 O M v) 00 O M 'n N O N 4 (- 0\ .-. M M M M d' 4 4 d' ,n v) v') .n nc .oN (- N (- (- 00 444 4d4dd 44444 d44V - - 4444 i-4 H M 4 v') v') .O ,.D N o0 00000 •-. N N M M . v) v) bA 444 44444 4 4 4,n v) � vi vi v) � v vi witr; v) v) ,r) ,) v) v) V') v) kr) v) kr) 1 ) v) kr. v) v) v) v) kr) v) N N N N N N N N N N N N N N N N N N N N N N N C4 N000 r"-: [--- Nr--- \C+ trIkr) M N a1 (-- "1- N Q) O N 00 M 0 'd' o (� M 0� v) (� M 0r; tri O vS:N 00 M 0) v'i o N 0) -rN 71- kin N 00 O N M 00 O - m V IO N 0) 4--, N N U c) kr) o VD VD VD O t` N t-- N N N co 00 00 00 0o 00 00 0) 0, r, ,. .- � ..-, ,� ,. � ,� ^., .� ,. .-, ,. .ter. -. ,-, - ,. ,-.1 CQ Cd a �-. ' 00 0 00 --. N V) o O Cr .-, v) o O ,-I ,-- M o0 0) ,O V d' N VO 00 ^-, N v) t- 0\ o M v) 00 ^- ,:r (- O M (- N (- N H H 0 06 N vS vC v 4 c) N - --. 0 0) 00 00 N k.O O )n 4 d ri ri �.., 7' 00 O N 'V \O 00 O N V N N 0� ^, M N 0) M W c.N v) )f kr) \O VDVD \C t` N N t` N r- 00000000 00 0) 0) 0) U My W v) v) v) kr) v) ken v) vn kr) v) sn V) v) kr) kr) V) v') v) v) v) s. al O ct • C7 0 td -j F+-i a nv), C#y N M 6NN d' dt ,0 0 N N M O Ci.1/4O * ‹O � N M O • , No, 0, 0' 100 , 00 ,1 (7,1:) N ,t I0 O v') 0 ) 4 d: 7:10 CA a C7 W ,� 0 0 cD 0 00000 66 -. 6 ,-, 666 -. 6N000 ;..4H O W r~ a Q U? r.. iricip � ww r ~ �/ H H O 0) '.O 7r vO o M N M 00 VO c •-. O 4 N - -4 kin m dA vD 4 N OO Cr*, ^r -. ,--' N M M N M 'd. vO v) M 00 (` N v) .-i ,--i .--i ,--i .-y _ _ .-, .--i ,--i .-. Cl.) '..J F-� '.O '.0 '.0 'O '.O '.0 l0 '.O '.O '.O.'.O 'O '.O 'O '.0 '.O ,c '.O '.O 'O '.O 'O N N N N N N N N N N N N N N N N N N N N N N 0-1O pi ~ cp W )--1c....) M t� N r- ;4 o 71- OCN In 00 --, '.0 00 0) N (- 0) co M 0) 0) 0 m ' .0 0000 00 N0\ v) 00 ,1- 'd. Mv') NN o000hVO MM M 0) 0) 0) 0) O o O 0) 0) 0) 0; 0\ 0) 0 0) 0 ) ) 0) 0) 00 00 00 00 Z W W � -� M M M M M M M M M M M M M M M M M M M O WN -, I Q a• s x 000 00000 0 0 0 0 0 0004= 0 0000 C/D p, 0 000 0o000 0 0 0 o O 0 0 0 0 0 0 0 0 0 • 0 � Gvio viOviOvi oviovio vioviovi oviOv) •,�, •'( W y )n t- o N v) t� O N In t� O N In N o N )n (- O N v) t- • � cd Z, W 4r 00 NN NNMmM mv � � � v) v v) v) a, � o -0 C4 2) � � � � � � � � � � � � � � c � � � � � � � A� � � ti m. 0 3 33333 33333 33333 33333 00 \O M N a1 M a1 M _ d- M O V N en1/4000 01/4 M O 00 d' N a " a, M � co � N M d' d; M N ^' 1 00 a, --,W O -, �O N N N N N N N N �O --+ �O �O O O N d• u> N 00 O M d' sO N a, O N M in 00 00 00 CT a1 a, 01 d1 0 0 0 0 0 0 0 a a aa a - - N N N NNNNN NNNNN O N ON pCA � CACA <n CACACAACA C/] CACCACACA cACACACA <n O a 01 a d' ' Cr, N a N M 0 M V) w O p1 �+ N 00 �--� in 00 N \O O d: a1/4 M 00 M N 1/40 0 00 U M 10 00 O M t` O N v'i N c N r N a\ N V N 0;00 00 00 O, a, a1 01/40000 O '-+ N N N N M H1/4.0 10 N N N o0 00 0\ 0\ 01 O O O ^, ^" .-. N N N M M v7 in iri v'; Vl in Vl 10 10 10 16 16 16 16 16 16 10 10 t in in V7 kr) kr) kr) V) V) V7 V1 kr) V1 I kg N N NNNNN NNNNN NNNNN NNNNN CA 00 en o0 N kr) Cr, N d' 1O N N 00 00 00 00 N N kr) d; M a ›, O r--+ ^ N N o0 M 00 d• a1 d' O d' a; d• d' a: d' 4 a; 4 N• 4 +n N o0 O M d• ,O N C' O_ N_ M v7 00 a, a N d• O L) H 4� - - - - NN NNNNN NNNNN NNNNN Q C/) Ct x o0 V7 d' 00 d' / M k•D M 'Cr N 00 N \O 00 'Cr 0 N 00 O U HN M Cl. kg N Cr, 'tet N a O CT 01 00 00 00 00 a1 O O a N Ni N ^, a �-+ O 06000 01 � Ca; a; a; a; OOO •ti CL)a O N a1 +--- M +n N a1 +--- M vl N o0 ONd' CO 00 O M +n N -+-+ .,/ W 4--1 CT a\ 0 0 0 0 O a a a a a N N N N N M M M M C.) ^ v') V) VO 1/40 1O 1O 10 10 1/4.0 1/4.0 10 10 1/40 1/4.0 V) VD 10 VD 10 10 1/40 Q O CCS .4-+ O H a O N N N N CT 00 N a d' 10 00 00 en N 00 n d + • 00 CD a. O �O M N — N O 1/4.o .4-) 1/4.o .1. O o0 'ct 'da N kr) kr) N N W W a� O 06 - 6 -- 6 -- 666 00006 66660 H Q U O C7 CS raw v H 1/40 +n N N VD +n d' O N 00 '-+ 00 00 N C in a, d' 0 kr) N M M a N N O' ON OO N \O +n V7 kr) N +n N V'1 00 .-i ��]] .--. -, - 0 0 0 0 6 0 0 0 0 O O O O O N NNNNN NNNNN NNNNN NNNNN 0 '-' W V U O 0 N d' +n N 01 d' 0 +n 0 C\ N N \O C M d' M - 0 d d; d 0 N CT N d en a 0 00 Cr, 00 10 VD +n d Z 4 -, 4 ,.O06 00 00 00 00 N N N N N N t-:. N �O �O v:; �O \O �O vD �O acl M M M M M M M M M M M M M M M M M M M M M O W ,4 N (Q o P W x o o000o 00o00 00000 00o00 P-4 P- E 0 00000 00000 000. 00 00000 • ' Z a y O N N O N f NLA ON t kr; O N N O N iri V kr; _O W ai Q� W �++ 10 �O \O VD N N N N 00 00 00 00 a1 a\ a1 01 0 0 0 0 a N O- 0 W ,..c, �O "O \D 10 VO 10 10 10 10 10 10 10 10 10 10 N N N N N 33333 33333 33333 33333 33 N 00 00 00 N co CD N V 00 v1 N vs 4v co d' VO 0\ v1 M 1 VD N cn CO N VO O Cl V1 VD \O VD V1 et N Cr, VD ee VD O cn 00 W r O\ m 00 N N ^- vi O, cn N O, N v6 O c N O M v5 O\ O N en v1 VD 00 Cr) O N M V1 \D N CD O N M et VD N 00 ee N N N Cl N N N cn cn on M M c) M 4 4 V 4 4 44 H z� N N N N N N N N N N N N N N N N N N N N N N oN rTh up Do uo oo up up Do up uP uo Do up up uo up coo up uP up U0 U0 CiD O N N — v-)v? M eh 4 ,f LID 4 4 '[t N 0, O N M ee N d' N O VD ee CT M N ,. v? on M N D---- '. d 00 0 400 O 4 VS Cr; on '0 00 -4m 00 O M vi O ClN '. 06 O N vi N O N 4 on M M 4 V 4 4 un v1 vn vl VD VD VD VD N N N N 00 00 00 V1 ' v1 V1 V7 v) v1 V1 V1 un V7 v) v7 N V1 N V) v1 Ln V1 H M M 4 4 et v1 v1 V1 V1 V1 V0 VD VD VD V0 N N N N N 00 00 V') v) v1 v1 vl V1 v) V) V1 N v1 v1 v1 vn vn v) v1 vn vn vn v1 vn 1 N N N N N N N N N N N N N N N N N N N N NN CA L,;...4 01 \D M ON et 01 V. 00 O cn V1 ,40 )n 4 D00 M N cr.;>, O r--� 0000 N N �--- .O O v1 O, M N ,-ti v1 a, M. N O 4 N 4N v1 N 00 O ^e M et VD N 00 O ee M4 v1 N 00 0 — N 4 NN N N M M M M M M M d 4 V 4 7 V 4 V1 V1 V1 vl v.)U H <4-IN N N N N N N N N N N N N N N N N N N N N N H Q x N N 00 vs N ^-- DD O O1 ,tr M v1 O N C CD v1 N M 4 O ^-. 4. VD 0\ Cl 'd \D O1 eh 00 . O VD M O N M M M v) eh eh vl .O U _ +.4 M 0 0 0 0 r. ^-- ^- N N M rt 4 u> v6 N 00 a, O ,- N M H y 01 — cn v1 N CD -- M v1 N O, ee M 41 N CD ,. M 00 O N .4"' 44c1-1 M 4 4 4 4 4 vh v 1 vl 1 vN N N N 1 VD VD VD VD VD 00 00 C.) �r+ QVD Vo VD Vo Vo VD VD VD VD VD VD VD Vo VD VD Vo VD Vo VD VD VD VD ;-.4 FJ -i (21 O C3 W a n O O N V7 v1 Cr) 00 on O N N — O V1 •-• 00 00 CD O\ VD CD ee �D .-. 7f .000 VO4O4. Cn cr) N01c v) 000000 ,. 00M W W 0 N 00 O O ---- O O O --, O O � 0 — O --1 O � O OW � O ›, in W QcA � Z. r� W v HN N \O N v1 v1 N 00 '.O M VO N et O N et v1 OD 01 N OD �-+ 00 M N N \D eh on 4 N M ' O ^-� O 0\ 0 O l0 00 01 v1 00 m-1 c O O O O O O O O O O O O O O C O O CD CD CD 0\ 0\ N .� l0 '.0 V0 VD VD VD VD VD l0 VD VD VO VO \O v VD VD V1 v1 v1 V1 V1 �—+ N N N N N N N N N ClN N N. N N N N N ClN N N � 0 . x . L. y1 F.ry U i- \0 v1 ct co CD VD N M 00 O O 01 O 00 N N O M v1 \O v1 N • W U N M N 00 vl V M ,-, N N d, d. N 00 N V1 D ^-, O\ \D V1 N • r n 1 o 0 '.O v1 v1 v1 vi v1 vi 4 'ci' d' 4 4 cn C,1cn C,) CID N N N N N 4 G M M M M M M cn M M M M M M M cn M M M M M M M - Q� O 00000 00000 00000 00000 00 p� p.., 5 00000 00000 00000 o ci) • 0 /�"4 0 v�i6vi6vi 6vi6vi6 vioviovi 6vD6vi6 vi0 F1N v1 N O N v1 N O N v1 N O N v) N O N v1 N co N v) W � c W 4r - N N N N cn on cn r1 d rt 4 4 N v1 v1 v1 Ma N1 O ,c 44 ^ N N N N N N N N N N N N N N N N N N N N N N w i—i )l ti I--I • • N 333 33333 33333 33333 3333 'h -. on VD t- O, on r" 4 4 m t- O O1 00 d' 01 on 00 N 00 o, rn On O O O •-, m t- -. 4 VD N N t- 4 ,. UN t� ) ON O O • W O1 on v6 0\ N v) 00 N vi 00 ,-. 4 N O m v) 0o O N V t� O1 • E,,,i O1 •-• N on v) VD t- O\ O on 7r tel N 00 O1 O N on 4 v) vD ,z < N N N N N N N N N N N N N N Cl vD N N N Cl N Cl N O N p/ 00 � oo tnoo � tnGO GO n00tn00 � U0Un00tn 00tn � t0 0w O v) N N N On N N kin v) t- On 0\ 00 00 o, 00 t- -. O 00 vD .1 O o1 N O N O v'i O, m t- -+ kint- -. v) NNC µi O N 00 O O 01 01 00.00 N lD �D ' v) V m M N •--, O 00 00 41 01 01 On on 00 00 00 00 00 00 00 0000 00 00 00 00 00 00 v) V) v) kin v) v) v) un v) v) v) v) v) v) v) v) v) v) v) v) v) v) 00 00 00 O1 O O ^. N m m V V) kr, \O N..00 00 01 O O •--, N \O '.O '.D '.D N N N N N N N N N N N-lam N N 00 00 00 00 ✓ )kin kin lin v) v) v) v) v) v) v) v) v) v) v) v) v) v) v) v) vl V) N N N N N N N N N N N N N N N N N N N N N N VD• N 0� Cr, 00 %.17:, vs) 'Tr m0r- on r- -- fit kn � v) m -. 004 O ++ t--4 -4 <3O) Nkr; oo -: 4 0: • , 4vOoo6N 4 '.ON0\ (1) VD 00 as O - m d- v) t- 00 a1 O N m 4v) N 00 On O -. N O a • y v) v) v) VD '.D '.D VD VD VD \D VD t- t- N N N N N t- 00 00 00 U H 4"1 N N N Cl N N N N N N N N N N N N N Cl N N Cl N VDi Ct 00 * C' N ,--NNNN •- cOmv) 4 - NT in Nv) mv) -- N O U F.-i +-+ vD On N t o0 O .' N d. VD O\ N VD VD N On .D d, N O ..y H a Q) 4 v) t� 00 01 .-+ N m 4 kr; 00 D; N 4 N O• --� m vn -. m Ln t` C N 4 00 O N �n t` O, W CN 0000 0000 0000 C Q On C On O CD CD O O - N N N N N ✓ �.�y W ^ '.O '.D VD VD VO VD '.D VD t- N l N N t- N t- t- N N N t- t- Q O • ct c 4 W ° H WC ,, v) t- m vD v) N N 00 It-- 6 O O. m o, vt m O N N .� oq a, m N CNoo 00 � -. N N c•-. [- \O O o0 �D •--1 O 4 oD N t--. [� W 'U W N C) •--, kri4 kr; 4mN6 •-• •--, OON O -- ,- •-• •--, OO -, O O �, H0 WE ~ vl v) L.5sz w v H on N '.D O1 O1 N On N 00 N 00 00 t` vz, •-- O '.D t` 00 VD VD m -•-• W a VD -. O 00 --' N v) VD '1t t` '.D VD r 00 00 N m m kin O) '--� O O m v) N6 N N N N N N NNN m m m ori m N =7 VD '.D VD VD t- t- N t- r N t- t- t- t- t- N t- N N t- N t- Lir N N N Cl N N N Cl N N N N N Cl N CV CV Cl N N N N N 1-1O Q.ti rU I...) O v) N v) N 01 N N C) O t7 m m m kin 00 00 00 m ^" '.D W ti U a) Ot- 4 � t- -. m • •-. �D14On t- mOt- 4 NN00t- N • , N N N N * O O O O 01 � O) 01 00 00 z .1r-' on on on m on on on on on on on on on on on on N N N N N N O W4N WQ W 000 00000 00000 00000 0000 a a E H +, 000 00000 00000 00000 0000 a N N O N N O N � N O kr;N A N o N N o N N O W r• .C W 4-i �D N l N N 00 00 00 00 ON On ON On O O O O •� •� •� N a N UO .0 Q NNN r- V- NNN t- t- NNN 0000000000 00000000 G- � ti • • M 3 33333 33333 33333 3333 cns.0 00 It 00 N N ,--+ N VO CT 00 a1 O O M M a O 00 --, v) N M N �--, oo )n 0', 1/4.0N 0O M O i) w Ni 4 \O N 00 O •-+ N M 4 )n \0 'O N 00 00 O, O ,--- • E"1 _ 00 O, O ,--- Ncn N o00, O Ncn iniOo0O\ O CnN NNNNN NNNNN NNNNN NNN Cr, F -© C) N 0 0 0 0 0 0 C� 0 C/] VD VD (/) U'D 0 C/] Cr) Cn cn o O O n N O\ \ ) 0 v) Cr, O cn '[t O,-, N N •--4 cn N O 1-r+ cn )n N o0 O\ O4, •--, N cn cn N c N N 0, -, N --+ o0 )-,-4O O Q 00 N \.O v) 4- 'ch M N O 0, 00 N \O in in 4 M 00 N N N N N N N N N N N \O \O \O \O VO 1/4.0 '0 �0 VO V) V) )n )n kt-) It )n V) V) WI V) V) V) V) V) kr) V) V) V) V) V) N ) cc) V' kr) kr) N N 00 00 CT, O O --4 .--, N N c c 71- 00 00 00 00 00 00 00 00 00 00 00 00 O) O) O) 0) O) O) 01 01 01 FFn/d e v) Vn kr) kr) v) v) kr) kr) kr) v') kr) kr) v) kr) v) ,kr) v'1 kr) v) kr) v) N NNNNN NNNNN NNNNN NNNNN V) N cr, cn s.0 00 00 00 \O - .N N N.N VO O\.N )n 0) c VO N O y-+ O N M 4 in \O N 00 0) 0\ O O •-+ ii--, N N_ N e M M 0 4 v) \ONo00\ O -- Ne1 v) N000\ O N cn 00 00 00 00 00 00 0-, a, O\ Cr, 0CCr) a\ Cr, C O O O O O U H w N N N N N N N N N N N N N N N cn c) M cnc) cn Cyy Q VD CCS - s~ . x N o0 v) 0) •-+ N V) 0\ 0) fn 0\ N VO --. N N O N cn v) O ,-� 7:t• N kr) O •--- N 1 71-cn 0 ' O N .O N O\\O 00 --. cci )nN 0\ Nd' N0\ N4N0>N 4NONkr; •4 • a 0 ..--, cn VD 00 O N ch N 01 •-- cn 1/4.000 O N.v) N N O W n CH N N N N N N N N N [NN N N N N N N N kciN N N N O Cd -4,, O H '� 4� 2 a u --: M V o0N — N ItO v).:N NNc' 000 O100a1MN N ^! N ,--: Coo 00 M � N 0\ •--- M VO M v) )n O O 0 r-� C7 W N o O ,-- �-- O ,-- O •-" N -,O O O ,-- N N Q 4 C. kr; .-, W C7 4 H 0\ .. V 10 .O N \0 .0 N 0 7 N o .:t• 1/4.0 "7t o0 bb N N 0) N 0 N N N 00 1/4.0 N l; 10 7t`:0 N �t M CT 4) N N N N N N N N N N N N N N r- r- N N N N N cll N NNNNN NNNNN NNNNN NNNNN O r r ›-+ rZ4 C.0 r--1 \0 kr) Nkr) ,-+ kr) 000 0 i 4 0\ oNo \0 � 71- -, 0kr) bb d' •-+ 00 V �--� O 00 N ---' Cr, 01 00 Ni cn M k) cn o0 Z Z .0) 00 0oNNNN \pvo \oon v '. ) ivi )nviv) )n kr; vi v) ' O W o �- N NNNNN NNNNN NNNNN NNNNN Oa P � .� (� x o 00000 00000 00000 00000 p.., p.., .0 E 4, o 00000 00000 00000 00000 • j 'O ck a OCOONO ON O in OON f) NON � NN � N � N � N N W (1)Cn Cd Q W w N N N M cn cn M v) v) v) 10 \O '.0 \O N N a Cd 0 .0 Q 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 Gq a )-4 .O • • 33333 33333 33333 33333 33 \O va N a, M r M O V a M V N O Nit) V) a, M1/44000•0 0ONONN •:1- OknO, --, M MNa, 1/4.0M 00N W N N N M M N N N N N O O O, 00 r ' d' M C N M N 00 CT 0 ---- N b' N co C 0 _ 00000 0 0 0 0 ,-, _ _ . . . . . N N , .. M M M M M M M M M M M M M M M M M M M M mm O N N O O M M M ,0 00 .-, O, 10 a, 1/4.0 --+ Tt N M O1 00 0 1/4.O 0 = a v) --, ,0 0, '-+ M M N ,-r a1 N V, a, V 01 N V O M 00 -, • U O (7, v) 4 N O oo .0 M a *1: •-• a v 06 v) m ,O v) v) unto in kn d' .1- M M M M N N N N - r+ V') kr) it kr) N v) V') tf) N v) If) Ifl kin kr) v) v1 • H� N N0000 a\ O �. ,-. N M M et t 00 WON (S� O0 a1 O; a; a; a; a; aQ O O O O O O O O O O O O O6 e �n If) v) In In If) v) It) ,O ,O ,D „O „O ,O ,O ,,O ,O ,O ,O ,,O „O �O N N N N N N N N N N N N N N N N N N N N NN N N ,O in N C a, M ,0 00 00 GO ,0 en a1 .71- N a, - --- -r o ›, Oi-+ M M M M N N a00 N Q vM N-. ^� O , ) O 00 N )n M -- G) �0 N 00 a\ 0 — N M �t V N00 a, -.ca --, --. Nm ,t v) N 0000 ,--. NNNNN NN U H 4-1 M MMMM MMMMM MMMMM ,MMMMM MM i-, H^ ( ) Cc I-� z - x 7t ,t N M 0 M o0 N --- v) M d- a, 00 •. I!) t` \O a, N O U i..� a, M a, N In MN NNNMv) ,O00 -� N O - ..--i E� ) N O M ,O 00 -� N O M 'Q 01 N )n 00 -4 00 - 00 a oO .--� M v) N O N - N O, .--- M \O 00 0 mints- 0N N +"' 4-a 100000000 aO, O, CO3 0000 - --. ,-. ,-. NN NN o W ^ N N N N N N N N N N 00 00 00 00 00 00 00 00 00 00 00 00 s.-4F-I Q O Ct Ct 1—i (� `Ja �1 o0 N )n O M N 000 � 00 N O a, O 0 00 ,Q., 4 (1) (::)-�-, L, oo N 00 O M N 0 O N (171-. N. .1-. N N O m O N O TS r:C1 a , ..-+ O N O N .-. ,-. .-, .-� O m Cl) N O C v) Cl) Uin z w H H N N In M - 'd' N O, r-^ N M N M M 00 M N 00 kr) ,:t .--i bb ,O k.0 O v) M 00 0 N. v) M N N -, N 00 -, v) 00 v) 00 E71 N N N N N N N N N N N N N N N N N N N N NN a4 v-, W U F-y O\ ,--i N 7I' N O, 00 M M V' O, M a, .1 zr M O, �0 ,--. 00 Nm W U t` OO 'C7 Cf' M t` O 00 \O N 0 a, l0 M M -- N M O 00 \O • Ga4 in 44444 N N N N N N N NN NN Cl) NNNN NNNNN O W H • Q x < Q Oa a x 00000 00000 00000 00000 00 arm-, E Ems „ 00000 00000 00000 00000 00 • 0 CD a NONOf) NONOf) N ONC� NO NO� NON Of) N Wcr) Cd < W 4-i N- N. 00 00 00 00 O, a, a, Cr, 0 0 0 0 .-+ r-. —4 N N NN a N W 0ICI 0000000000 0000000000 a, a, O, a, a, a, a, a, a, a, a, a, M Y • 0 �ti 3 N a W M O u cn g 6 ‘,„ sa W O (., ,„W 5a,—4 N 6 N V) O N N N cn Q Ct a dx •o H o P4W N x ?W 00 (.7 Q 0 c p C7 ›, "ZS rr(o '4 C. W ,� o N Or, b • � � a) 4•1a v; v1 0 • CS N �~ w 0 a 06 N Ln ;C' P4 O M ti N - WL7 U tb , 173 OW o gQx 'tQ _o O Q u i4 0 Q E. W Z W N (i)p.., o ..fl W Q cn B aa •° w 0 0 >, (0w L -aI- (I OL Z w 0 -1C.DLS- 2 o - O LU O 0 0 r r ZQ_ar___y r -O a) o Q F- a, - ,--i N rl r r -1 -I / r r -o L31 O Q Q 1-1 s-I O O O CO O Lfl" .1/"..111/1" 1 1 L O N L J J 1 1 L O `/ O = W I- a w 0 0 o w Ln v7 Q Lu _ CD 1►• D o CL r r S•♦ i , , , r r _o w Ofty CL (n • O C7 �- o Z Z ,r '•w., r O 'CO u.. --• = Z F- J • Ln w Lf1 5 o Ln ,--i ce N LU >- Ce Q w CD O ZwL J 1.� L J 1 1 _0 0 O= _ • r-L g 0 0 • o • a °- o • X • m o Ln o Ln o Ln o Ln o Ln o J Cr) M N N ,-i Ti NOILVNIiJNI • >. caw CO !!• 0 Z J 0 O O rzi Q) � LU DO O • 0 OI— NjQrn 0 a 5 0 0 0 U mOE •• o0 N ,-1 p ,--I N O� O O Q• Q r-i ` 0 _ 00 0 O 0 N O ` O 0 2 VD H C_ LU a 0 - pw 0 � Q Li) ,2 v _ 0 O o a/ O O 0 co LI) a 0 o LL) - cc • 1 U L ---a♦ •,.,.,.-....T________________,...; ----------- N '1r'I ^...-.-......aadi - v CDI •eJ....3.• Ce o w r .._�:-_♦ ce O •--------- _1 -- --•----r.• .2 • 11.1 = 4-'ca � ao o 0 ----- m J Cr) N o - Hlnwzzd • • W tui > U)• " Z J O o O O -' LU ----'Z-•-Oa r T -1 r T I- 0 a� o OG I— a,N -- o V) � U , a 5 mwZ -- U d0- (7 0 N ,�-1r O ,--I N _4 Cr) O O <• < _, Ti ` I -1 O 0 -- CO -i 0 I L J r 0 N r `O° a w 0 0 -- 0 w r-0 D Ln V) Q w E IO . Z M co J R ce • O �a r 00 * N '� _I (.9 w at ›- W R* --I o �• CD Z CO Z r T r r T 0 1-4 Iiji l F- �%g 0 U 0 a a c �, X - o -O L1.1 }' 0 0 0 0 0 0 0 0 0 • a 0 0 0 0 0 0 0 0 0 Xi -.1 CO N - O Ln 1- M N +--i (4) HldJa TdDInnA >. roW -o Z o L �Z-1 N W O 4' pto C , Q) O - N ,, 2 ,--1 a 5 - U o a; Ln 4 l _o ,-i N O O - a 1-i - O r--i ---, r r ,�-i - O -O N - O J 4 1 L L Ln N e -- _. 1- 1- _0 0 rI Z Ce o 0 -Ln M _ (.9 - = 0 0 -o O - 1 m _ W a w OJ J O - O z O V-im' m z E © 00 DLLi OI+ N I- z Q - N W ---, , O_-- -O ,1 6 rY W Q W -i m Ca w O0 = o g0 U J i 1 L L -o O . - l0 aac X . W _ o 0 0 0 0 0 0 0 0 0 0 0 0 a 0 Ln o In o Ln o m J *-i ,--i N N M (4J) DNILS`d3 • • > LU (1) t-,' 2 - J ,±i- -- -LCL 0 Q - O a1-+ LU I-OC? 0 C M w l',ll O a� O OI— m , I N ,, ® U Q L c a G Cr) -1 Z Ln C7 ___ __aa=sof N ,-� F O r I N •-is •-««-Lizs j�41.___4,4 O = Q _ ri 1 • t....-. ' O 0- + ---� r N •-= 0 etzet r�'' - 0 - tD d w Efras==.41t : 0 1== • -- Ln v.) Q ---0"1.... --0"1"..• •0 -i 0 ce r 0 CO AVIC.ZE : CL 7117 iiiiii° o ••,E J ,z., (!) M----•sss O m ♦ - ---- 0 - ----------•.Lu Ln z �, M 1 Ln J •:S• W •-- Ln ~* _ 0 -• W .•- W• `�• c0 m .� O o w DAA f O g 0 0 ~-''• 0 ce • -- as c ......1 _ Lu - w -o d - u 0 Ln O Ln O Ln O ' coJ M Ni N r-i +-i O O ,kJS ADS DD1ooa s Survey QC - RGS-specification Sheet gyro/data SURVEY QUALITY CONTROL- SPECIFICATION DATA PRE-JOB CALIBRATION VERIFICATION CHECK(ROLL TEST) Station ToolFace Gravity Error Scale Factor Rate Error (deg) (Mg) Uncertainty (deg/min) 64 270.52 226.30 0.00005606 -0.69 63 270.52 234.29 0.00005804 -1.11 • 62 225.41 393.00 0.00009823 -4.14 61 225.41 393.36 0.00009832 -3.34 60 47.17 459.94 0.00011491 1.40 59 47.17 457.52 0.00011431 1.07 58 0.44 83.09 0.00002097 -0.75 57 0.44 91.48 0.00002309 -0.53 56 331.08 -171.00 -0.00004298 -1.76 55 331.08 -168.80 -0.00004242 -1.02 54 300.46 -94.61 -0.00002355 1.14 53 300.46 -93.15 -0.00002319 -0.41 52 271.12 229.76 0.00005692 -1.55 51 271.12 235.19 0.00005827 -0.11 50 240.36 430.59 0.00010714 -1.23 49 240.36 431.92 0.00010747 -0.14 48 210.49 348.60 0.00008755 -1.80 47 210.49 349.45 0.00008776 -2.55 46 180.10 85.45 0.00002157 -1.12 45 180.10 88.20 0.00002226 2.50 44 150.68 -114.63 -0.00002881 0.34 43 150,68 -111.44 -0.00002801 -0.91 42 119.26 -2.04 -0.00000051 0.96 41 119.26 -2.71 -0.00000067 0.11 40 90.83 319.19 0.00007909 4.17 39 90.83 322.34 0.00007987 2.91 38 59.71 506.46 0.00012606 -0.47 37 59.71 511.20 0.00012724 -2.19 36 29.91 397.99 0.00009998 -0.96 35 29.91 400.70 0.00010066 0.14 34 0.61 113.79 0.00002872 -2.73 33 0.61 122.32 0.00003088 -3.04 32 270.84 240.41 0.00005956 1.78 31 270.83 249.14 0.00006172 -1.89 30 225.98 411.69 0.00010289 -5.27 29 225.98 414.85 0.00010368 -5.59 28 46.41 480.09 0.00011998 0.76 27 46.41 480.32 0.00012004 0.97 26 0.31 100.26 0.00002531 -2.59 25 0.31 106.70 0.00002693 -0.25 24 330.38 -156.56 -0.00003934 -2.06 23 330.38 -158.48 -0.00003982 -3.74 22 299.53 -74.74 -0.00001860 -0.90 21 299.53 -73.20 -0.00001822 -1.50 20 271.32 242.44 0.00006006 0.12 19 271.32 244.63 0.00006061 2.00 18 240.78 445.38 0.00011081 -0.65 17 240.78 446.52 0.00011110 -0.17 16 210.62 373.45 0.00009379 -1.81 15 210.62 374.36 0.00009402 -2.17 14 181.68 130.07 0.00003283 -0.72 13 181.68 138.57 0.00003498 1.97 12 150.20 -86.89 -0.00002184 2.81 11 150.20 -83.47 -0.00002098 1.27 10 120.43 16.20 0.00000403 3.36 9 120.43 21.31 0.00000531 1.93 8 91.34 352.73 0.00008741 0.47 7 91.34 363.24 0.00009001 4.50 6 60.99 527.47 0.00013125 1.41 5 60.99 528.85 0.00013159 0.79 SURV-Q167(OPS SUR-MA-003) 19th Nov 03/Rev 15 Page 1 of 6 AK0215GCM110 • Survey QC - RGS-Specification Sheet gyro/data 4 30.60 409.48 0.00010285 -1.97 3 30.60 412.83 0.00010369 -2.72 2 359.60 90.28 0.00002279 0.84 1 359.60 92.60 0.00002337 -1.11 MBO = 0.13 Gravity Error= 211.47 Scale Factor Uncertainty = 0.00005277 Rate Error= -0.44 POST-JOB CALIBRATION VERIFICATION CHECK(ROLL TEST) Station ToolFace Gravity Error Scale Factor Rate Error (deg) (Mg) Uncertainty (deg/min) 12579 269.73 207.45 0.00005139 -1.77 12578 269.73 212.50 0.00005264 -3.17 12577 223.91 391.42 0.00009788 -3.35 12576 223.91 394.50 0.00009866 -5.03 12575 45.81 456.34 0.00011406 1.68 12574 45.81 468.47 0.00011710 0.35 12573 0.21 121.83 0.00003075 -2.49 12572 0.21 127.75 0.00003225 -3.44 12571 329.13 -152.07 -0.00003820 -0.98 12570 329.13 -156.94 -0.00003942 -1.68 12569 299.16 -100.26 -0.00002495 -1.32 12568 299.16 -100.09 -0.00002491 -1.61 12567 269.03 229.79 0.00005692 -0.27 12566 269.03 237.25 0.00005877 0.38 12565 239.23 428.52 0.00010666 0.04 12564 239.23 425.27 0.00010585 0.19 12563 210.38 368.59 0.00009258 -0.86 12562 210.38 369.43 0.00009279 0.65 12561 181.50 144.48 0.00003647 0.51 12560 181.50 143.84 0.00003631 -0.97 12559 148.45 -89.97 -0.00002260 0.59 12558 148.45 -85.44 -0.00002146 1.62 12557 121.39 -12.99 -0.00000323 1.57 12556 121.38 -9.02 -0.00000225 0.90 12555 91.03 302.77 0.00007502 1.70 12554 91.03 304.07 0.00007534 1.73 12553 59.59 506.44 0.00012606 2.13 12552 59.59 514.71 0.00012812 0.81 12551 28.51 405.77 0.00010198 0.38 12550 28.50 403.73 0.00010147 -0.04 12549 358.64 115.18 0.00002908 -4.83 12548 358.64 119.48 0.00003016 -4.01 12547 269.63 220.95 0.00005473 -2.10 12546 269.63 224.35 0.00005558 -1.39 12545 223.44 394.44 0.00009866 -1.20 12544 223.44 390.62 0.00009770 -2.61 12543 44.45 460.43 0.00011514 1.01 12542 44.45 462.24 0.00011559 0.95 12541 0.32 122.58 0.00003094 0.01 12540 0.32 130.46 0.00003293 -1.10 12539 329.23 -153.49 -0.00003856 -0.88 12538 329.24 -144.03 -0.00003618 -1.52 12537 299.69 -75.33 -0.00001875 0.77 12536 299.69 -76.86 -0.00001913 0.84 12535 271.17 224.07 0.00005551 0.26 12534 271.17 223.65 0.00005541 -0.21 12533 241.45 435.73 0.00010839 -1.21 12532 241.45 438.95 0.00010919 0.18 12531 211.37 359.07 0.00009016 0.34 12530 211.37 359.10 0.00009016 0.72 12529 182.25 128.39 0.00003241 0.30 12528 182.25 131.15 0.00003311 2.95 12527 150.53 -94.58 -0.00002377 3.00 SURV-Q167(OPS SUR-MA-003) 19`h Nov 03/Rev 15 Page 2 of 6 AK0215GCM110 • Survey QC - RGS-COpecification Sheet gyro/delta 12526 150.53 -92.86 -0.00002334 4.67 12525 122.19 8.13 0.00000203 2.88 12524 122.19 9.48 0.00000236 2.23 12523 91.42 368.82 0.00009140 2.49 12522 91.42 377.66 0.00009359 2.61 12521 60.59 553.67 0.00013779 1.01 12520 60.59 560.17 0.00013941 2.00 12519 30.90 404.20 0.00010151 2.62 12518 30.90 402.73 0.00010114 -0.85 12517 0.02 63.76 0.00001609 -0.73 12516 0.02 66.82 0.00001687 -0.13 MBO = 0.06 Gravity Error = 212.14 Scale Factor Uncertainty = 0.00005296 Rate Error= -0.04 INITIALISATION Gyro Compass Reading /Station Raw Inclination Raw Azimuth Abs(ERMeas-ERTheo) 97 10.51 242.26 0.0147 98 10.51 242.07 0.0052 99 10.51 242.19 0.0363 100 10.51 242.13 0.0304 101 10.51 242.09 0.0417 102 10.51 242.09 0.0264 103 10.51 242.09 0.0330 104 10.51 242.27 0.0193 12441 10.65 242.23 0.0712 12442 10.65 242.23 0.0480 12443 10.65 242.18 0.0367 12444 10.65 242.14 0.0386 12445 10.65 242.07 0.0454 12446 10.65 242.11 0.0521 12447 10.65 242.18 0.0612 12448 10.65 242.33 0.0729 12449 10.65 242.34 0.0603 12450 10.65 242.25 0.0543 Average 10.58 242.18 0.0415 Tolerance on Average* t. .,. ' , / ..k n . ,.„ ,.. . >_. 0.0819 Standard Deviation 0.07 0.09 0.0187 Tolerance on St. Dev.** 0.10 0.20 0.0374 Advanced Initialisation Azimuth Advanced Initialisation Standard Deviation Tolerance =TBA * Tolerance on Average of earth horizontal rate difference is given by (1/Cost)*.I[(CosA*SinI*0.1)2+0.0821 °/hr ** Tolerance on Standard Deviation of earth horizontal rate difference tolerance is given by (1/Cost)*J[(cosA*SinI*0.1)2+(0.082/(n-1))] 0/hr DRIFT TUNES Drift Tune Ending Ending Ending Ending Residual Gx Bias Residual Gy Bias Number Time Depth Inclination Azimuth Start End Start End 1 387.16 3400.21 15.72 246.04 -0.000 0.001 0.001 0.001 2 596.31 4000.14 29.85 252.87 0.002 -0.001 0.000 0.001 SURV-Q167(OPS SUR-MA-003) 19th Nov 03/Rev 15 Page 3 of 6 AK0215GCM110 gy�i�/,/p�,, 410 Survey QC - RGS-specification Sheet ta 3 1193.39 6000.13 39.18 260.54 -0.001 0.002 -0.004 0.006 4 1725.07 7500.18 33.64 259.92 -0.001 0.002 -0.002 0.004 5 1712.29 9000.20 23.09 283.24 -0.002 0.002 -0.008 0.007 6 541.51 9280.13 20.52 287.79 -0.000 0.000 -0.003 0.003 7 565.22 8999.95 23.07 283.41 -0.001 0.002 0.003 -0.003 8 1731.48 7499.83 33.36 259.67 0.003 -0.004 0.009 -0.009 9 1752.21 5999.92 39.01 259.97 0.003 -0.003 0.003 -0.003 10 1257.14 5000.01 42.13 254.43 0.002 -0.002 0.002 -0.002 11 1257.22 3999.85 29.85 252.40 0.001 -0.000 0.003 -0.003 12 864.35 3399.94 15.63 245.71 0.001 -0.000 0.001 -0.001 13 520,73 3149.46 10.58 242.42 -0.004 0.003 0.001 -0.001 Average 0.000 0.000 0.001 0.000 Standard Deviation 0.002 0.002 0.004 0.004 Tolerance for both the Average and the Standard Deviation 0.033°/hr 0.033°/hr 0.033°/hr 0.033°/hr INCLINATION AND AZIMUTH INRUN AND OUTRUN COMPARISON Depth Corrected Inclination Corrected Azimuth Inrun * I Outrun * I Difference Inrun * I Outrun * I Difference 200.00 0.61 0.43 0.18 182.28 226.23 -43.95 300.00 0.57 0.64 -0.07 168.34 194.62 -26.27 400.00 0.52 0.52 0.00 154.20 148.81 5.39 500.00 0.52 0.57 -0.04 188.05 213.36 -25.31 600.00 0.52 0.35 0.17 221.85 225.59 -3.74 700.00 0.58 0.65 -0.08 180.37 150.04 30.34 800.00 0.63 0.34 0.29 138.89 115.22 23.68 900.00 0.41 0.48 -0.07 90.08 115.99 -25.91 1000.00 0.19 0.46 -0.27 41.13 95.39 -54.26 1100.00 0.28 0.33 -0.05 62.15 54.75 7.40 1200.00 0.38 0.48 -0.11 83.10 135.70 -52.60 1300.00 0.36 0.15 0.21 167.73 300.17 -132.44 1400.00 0.34 0.59 -0.25 252.22 176.23 75.98 1500.00 0.35 0.24 0.11 181.09 78.10 102.98 1600.00 0.37 0.43 -0.06 109.58 133.60 -24.02 1700.00 0.44 0.19 0.25 145.13 47.22 97.91 1800.00 0.51 0.41 0.10 180.56 98.28 82.28 1900.00 0.52 0.52 -0.01 122.57 92.36 30.21 2000.00 0.52 0.47 0.05 64.46 56.36 8.10 2100.00 0.43 0.52 -0.09 42.32 111.95 -69.63 2200.00 0.34 0.32 0.02 20.19 155.96 -135.76 2300.00 0.46 0.36 0.10 300.83 238.34 62.49 2400.00 0.58 0.23 0.35 221.24 117.68 103.55 2500.00 0.47 0.30 0.17 272.17 311.64 -39.47 2600.00 0.36 0.17 0.19 323.06 94.25 -131.19 2700.00 1.68 0.57 1.11 308.65 269.33 39.32 2800.00 3.01 3.08 -0.07 294.01 294.24 -0.23 SURV-Q167(OPS SUR-MA-003) 19th Nov 03/Rev 15 Page 4 of 6 AK0215GCM110 ' • Survey QC - RGS-CSpecification Sheet gyro/data 2900.00 5.31 5.13 0.17 280.05 288.55 -8.50 3000.00 7.61 7.86 -0.25 266.12 260.74 5.39 3100.00 9.42 9.46 -0.05 243.82 244.09 -0.28 3200.00 11.75 11.72 0.03 243.35 242.82 0.53 3300.00 13.56 13.61 -0.05 244.85 244.42 0.43 3400.00 15.71 15.62 0.09 246.04 245.70 0.34 3500.00 17.24 17.26 -0.01 247.58 247.52 0.06 3600.00 19.41 19.38 0.03 250.58 250.36 0.22 3700.00 21.89 21.92 -0.03 252.21 251.88 0.32 3800.00 24.85 24.84 0.01 252.05 251.63 0.43 3900.00 27.53 27.48 0.04 252.41 251.99 0.43 4000.00 29.84 29.80 0.04 252.86 252.38 0.48 4100.00 32.75 32.73 0.02 252.41 251.96 0.44 4200.00 35.60 35.58 0.02 252.35 251.87 0.49 4300.00 37.55 37.49 0.07 252.15 251.66 0.49 4400.00 38.51 38.42 0.09 252.00 251.51 0.49 4500.00 38.92 38.90 0.02 252.16 251.67 0.49 4600.00 40.03 39.85 0.18 252.39 251.92 0.47 4700.00 40.44 40.37 0.07 252.81 252.35 0.46 4800.00 41.48 41.33 0.15 253.35 252.86 0.50 4900.00 42.39 42.31 0.08 253.89 253.44 0.45 5000.00 42.49 42.23 0.26 254.81 254.37 0.44 5100.00 39.55 39.30 0.25 255.63 255.23 0.40 5200.00 38.54 38.39 0.15 255.45 255.01 0.45 5300.00 37.98 37.79 0.19 255.63 255.18 0.44 5400.00 37.81 37.68 0.13 256.85 256.44 0.41 5500.00 37.75 37.60 0.16 257.04 256.60 0.44 5600.00 38.03 37.88 0.15 258.02 257.56 0.45 5700.00 38.17 38.05 0.12 258.35 257.96 0.39 5800.00 38.87 38.72 0.15 259.56 259.15 0.41 5900.00 38.83 38.69 0.14 259.95 259.51 0.45 6000.00 39.14 38.99 0.15 260.52 260.04 0.48 6100.00 39.69 39.56 0.13 260.61 260.16 0.44 6200.00 40.18 40.03 0.15 261.01 260.57 0.44 6300.00 39.66 39.51 0.15 261.27 260.88 0.38 6400.00 39.47 39.31 0.16 261.32 260.96 0.37 6500.00 38.96 38.80 0.16 261.72 261.30 0.42 6600.00 38.53 38.39 0.14 261.42 261.08 0.34 6700.00 38.31 38.17 0.14 261.02 260.69 0.33 6800.00 37.51 37.38 0.13 260.74 260.45 0.30 6900.00 37.16 37.02 0.13 260.43 260.11 0.33 7000.00 36.76 36.63 0.13 260.58 260.31 0.27 7100.00 36.47 36.35 0.13 260.63 260.37 0.27 7200.00 35.87 35.74 0.13 260.37 260.05 0.32 SURV-Q167(OPS SUR-MA-003) 19'h Nov 03/Rev 15 Page 5 of 6 AK0215GCM110 1 Survey QC - RGS-specification Sheet gyro/data 7300.00 35.20 35.06 0.13 260.29 260.04 0.24 7400.00 34.50 34.37 0.13 259.90 259.61 0.28 7500.00 33.63 33.51 0.12 259.91 259.64 0.27 7600.00 32.72 32.60 0.12 259.69 259.55 0.14 7700.00 31.76 31.74 0.02 262.96 262.69 0.28 7800.00 32.15 32.08 0.08 271.43 271.40 0.03 7900.00 31.72 31.65 0.07 272.27 272.27 -0.00 8000.00 30.75 30.71 0.04 272.39 272.31 0.07 8100.00 29.51 29.46 0.05 272.98 272.95 0.03 8200.00 28.77 28.74 0.03 273.63 273.62 0.01 8300.00 27.46 27.45 0.01 273.85 274.01 -0.16 8400.00 26.45 26.51 -0.06 273.56 274.32 -0.77 8500.00 25.97 26.03 -0.06 275.44 275.46 -0.02 8600.00 25.29 25.43 -0.15 273.98 273.55 0.43 8700.00 25.22 25.38 -0.17 276.57 275.73 0.85 8800.00 24.36 24.47 -0.10 279.04 278.45 0.59 8900.00 24.06 24.10 -0.04 281.11 281.10 0.02 9000.00 23.03 23.14 -0.11 283.24 283.17 0.08 9100.00 22.32 22.36 -0.04 284.92 284.74 0.18 9200.00 21.37 21.44 -0.07 287.26 287.17 0.08 Average 0.0703 0.3075 Standard Deviation 0.1625 0.2323 Tolerance for both the Average and the Standard Casing 0.30 K 't s p 7g , , # Casing 0.50 Deviation Drillpipe 0.30 .; e, ._ ,.,'; z. , ..'. , „_. Drillpipe 0.75° * Inclination and Azimuth interpolated to same depths as shown. SURV-Q167(OPS SUR-MA-003) 19th Nov 03/Rev 15 Page 6 of 6 AK0215GCM110 • Survey QC - RGS-•Analysis Sheet greidata SURVEY QUALITY CONTROL- DATA ANALYSIS REFERENCE SYSTEMS Grid System I I Grid Correction 10.00 Azimuth reference: Grid/True North TRUE NORTH Vertical reference: RKB/MSL/Other RKB If other give details TIE ON DATA Depth 0.00 Inclination 0.00 Azimuth 0.00 TVD 0.00 Northings 0.00 Eastings 0.00 Latitude 70.3202 Az. Ref: Grid Corrected Y/N? N Description Grid/True CALIBRATION • Tool Number F0052 Calibration Date 17 May 2014 OPERATING TEMPERATURE Calibration range From 50.48 To 120.02 Gyro operating range From 65.35 To 84.73 Spec'-Within calibration range FIELD ROLL TEST (Only valid on fixed structures. When not possible input roll test data performed after return to base) Cal value Pre job offset Post job Abs dif.cal.post Abs dif.pre.post Spec' offset Accel Scale 0.000056 0.000053 0.000053 0.000053 0.000000 Cal/Post-0.00015 Mass Unbalance 0.50 0.13 0.06 0.06 0.07 Pre/Post- 0.4°/hr INITIALISATION Depth (Approx) 3149.76 No of stns 18 Spec'- Min No. -6 Azimuth Mean 242.18 Std deviation 0.09 Spec'-Azi SD 0.2° Inclination Mean 10.58 Std deviation 0.07 Spec'-Inc SD 0.1° Earth Horizontal Rate Mean (Abs(meas-theor)) 10.04 Std deviation 0.02 Spec'-See Q167 DRIFT TUNE Residual x gyro bias Mean 0.000 Std dev' 0.002 Spec's - Mean and SD- 0.333°/hr Residual y gyro bias Mean 0.000 Std dev' 0.004 Spec's- Mean and SD-0.333°/hr TOOLFACE RATE Maximum toolface rate 166.05 I Spec'-400°/sec IN/OUT COMPARISON (AZI' N/A IF INC' <15°) Inclination Difference Mean 0.07 Std dev' _ 0.16 Spec's- Casing 0.3°/Drill pipe 0.3° Azimuth Difference Mean 0.31 Std dev' 0.23 Spec's-Casing 0.5°/Drill pipe 0.75° Lateral Divergence/1000 2.54 Spec- 5.0/1000 Vertical Divergence/1000 0.54 Spec'- 2.0/1000 DEPTH CONTROL Wireline Company Schliumberger Line type 15/32 Encoder SF I Schlumberger Max Depth (TD) 9280 CCL Corrected NO Zero Depth (Rig up) RKB @ 75.63 ft AMSL Rezero Depth -6 ft Given pup joint depth NA Measured P.) NA Strech cor.At TD divided by TD/1000 .6521 Spec'- 1.5/1000 Dif. Between rigup and rezero depths divided by TD/1000 .6521 Spec'- 2.0/1000 Dif. Between given and meas depth divided by meas/1000 NA Spec'- 2.0/1000 SURV-Q165(OPS SUR-MA-010)22"d Jan 2004/Revision 20 Page 1 of 1 AK0215GCM110 r • SIdata Survey QC - RGS-CT Acceptance Sheet t FIELD AND SURVEY INFORMATION Operator BP EXPLORATION Field/ Platform SCHLUMBERGER WIRELINE Well Number PRUDHOE BAY G-15C Survey section From 0.00 ft. to 9280.0 ft. Date 08 Feb 2015 Gyrodata Job No AK0215GCM110 Gyrodata Surveyors Henry Drew,Jeff Patrick Job Objective High Accuracy Gyro Survey SURVEY PERFORMANCE In Spec' QC Parameter Yes/No/NA Possible Actions Contact Duty Engineer to discuss options: Operational temperature within Yes 1. Recalibrate tool to higher temperature specification 2. Resurvey with backup tool 3. Resurvey'Hot'section at higher speed Roll test data within specification Contact Duty Engineer to discuss options: Only valid on land/fixed installations Yes 1. Recalibrate tool and reprocess survey 2. Resurvey with backup tool Continuous initialisation within Take new initialisation, after three failures: specification Yes 1. Contact Duty Engineer or, 2. Resurvey with back up tool. Contact Duty Engineer to discuss options: Toolface rate within specification Yes Resurvey section from previous bias check Investigate and comment if effects are negligible Contact Duty Engineer to discuss options: Drift tunes within specification Yes 1. Reprocess with different software settings 2. Resurvey with backup tool Inrun/Outrun comparison within Contact Duty Engineer to discuss options. specification Yes Resurvey is usually not required if either inrun or outrun meet all other QC parameters Depth control within specification Yes Contact Duty Engineer to discuss options. Action taken: Note: Provided satisfactory action has been taken, parameters out with specification will not necessarily fail a survey. SURVEY ACCEPTED Gyrodata Representative Client's Representative SURV-Q166(OPS SUR-MA-003)13th Nov 03/Revision 12 Page 1 of 1 AK0215GCM110 2 1 4 1 2 6 RECEIVED25688 A9g 10 2015 Letter of Transmittal AoGcc BAKER Date: DATA LOGGED April 8 2015 5 �‘/20I5 HUGHES __p_ K.BENDER To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7`h Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Paula Lacey paula.lacey@bakerhughes.com Please find enclosed the final directional survey data for the following well(s): G-15C Enclosed for each well(s): 2 hardcopy prints of final directional survey reports 1 compact disc of final directional survey reports° Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Al k Alaska 99 508 to acknowledge receipt of this data. RECEIVED BY: ôet4 State of Alaska AOGCC DATE: 21 41 26 25 688 RECEIVED 'i rii, APR 10 2015 ,„00 by AOGCC gr 0 It North America - ALASKA - BP Prudhoe BayOR PBG Pad G-15 - Slot 15 500292064700 G-15C bit Design: G-15C Survey Report - Geographic 11 November, 2014 raiiii BAKER HUGHES 500, Fa- 0 `'... bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-15-Slot 15 Project: Prudhoe Bay TVD Reference: G-15 @ 75.63usft Site: PB G Pad MD Reference: G-15 @ 75.63usft Well: G-15 North Reference: True Wellbore: G-15C Survey Calculation Method: Minimum Curvature Design: G-15C Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB G Pad,TR-11-13 Site Position: Northing: 5,966,832.87 usft Latitude: 70°18'58.211 N From: Map Easting: 656,301.39 usft Longitude: 148°43'59.01 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.19° Well G-15 API No. 500292064700 Well Position +N/-S 0.00 usft Northing: 5,968,324.00 usft Latitude: 70°19'12.682 N +E/-W 0.00 usft Easting: 657,239.00 usft Longitude: 148°43'30.75 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 40.29 usft Wellbore G-15C API no. 500292064703 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°1 (°) (nT) BGGM2013 9/1/2014 19.62 81.01 57,625 Design G-15C Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,792 92 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (°) 35 34 0.00 0 00 245.89 Survey Program Date: 11/11/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 9,500.00 1 :Sperry-Sun BOSS gyro multi(G-15) BOSS-GYRO Sperry-Sun BOSS gyro multishot 9,524.00 9,792.92 MWD(G-15B) MWD MWD-Standard 9,811.00 9,844.31 Inc+Trend(G-15C) INC+TREND Inclinometer+known azi trend 9,874.35 11,846.65 MWD(G-15C) MWD MWD-Standard 11/11/2014 2:41:45PM Page 2 COMPASS 5000.1 Build 61 ,,N� 1 by Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-15-Slot 15 Project: Prudhoe Bay TVD Reference: G-15 @ 75.63usft Site: PB G Pad MD Reference: G-15 @ 75.63usft Well: G-15 North Reference: True Wellbore: G-15C Survey Calculation Method: Minimum Curvature Design: G-15C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +Nl-5 +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,792.92 33.33 263.05 8,752.77 -399.01 -3,405.03 5,967,853.78 653,843.32 70°19'8.750 N 148°45'10.11 W TIP 9,811.00 34.58 267.45 8,767.77 -399.84 -3,415.09 5,967,852.74 653,833.28 70°19'8.742 N 148°45'10.40 W KOP 9,844.31 38.05 259.56 8,794.62 -402.13 -3,434.64 5,967,850.04 653,813.78 70°19'8.719 N 148°45'10.97 W Interpolated Azimuth 9,874.35 43.12 253.65 8,817.44 -406.70 -3,453.62 5,967,845.08 653,794.91 70°19'8.674 N 148°45'11.53 W 9,904.33 47.93 245.45 8,838.45 -414.22 -3,473.60 5,967,837.14 653,775.09 70°19'8.600 N 148°45'12.11 W 9,941.79 50.39 231.97 8,863.01 -428.93 -3,497.68 5,967,821.93 653,751.32 70°19'8.455 N 148°45'12.81 W 9,974.40 50.69 220.22 8,883.78 -446.33 -3,515.76 5,967,804.15 653,733.62 70°19'8.284 N 148°45'13.34 W 10,004.40 54.09 210.90 8,902.11 -465.65 -3,529.51 5,967,784.55 653,720.27 70°19'8.094 N 148°45'13.74 W 10,034.49 55.72 200.79 8,919.44 -487.77 -3,540.20 5,967,762.21 653,710.05 70°19'7.876 N 148°45'14.05 W 10,065.66 58.52 191.45 8,936.39 -512.88 -3,547.42 5,967,736.96 653,703.35 70°19'7.629 N 148°45'14.26 W 10,094.69 62.03 181.13 8,950.81 -537.89 -3,550.14 5,967,711.90 653,701.16 70°19'7.383 N 148°45'14.34 W 10,124.61 66.41 173.05 8,963.84 -564.76 -3,548.74 5,967,685.07 653,703.12 70°19'7.119 N 148°45 14.30 W 10,155.93 69.36 167.22 8,975.63 -593.32 -3,543.76 5,967,656.62 653,708.70 70°19'6.838 N 148°45'14.15 W 10,184.69 71.73 158.11 8,985.23 -619.17 -3,535.67 5,967,630.95 653,717.33 70°19'6.584 N 148°45'13.92 W 10,214.88 73.71 154.79 8,994.20 -645.59 -3,524.15 5,967,604.78 653,729.40 70°19'6.324 N 148°45'13.58 W 10,244.42 73.30 152.78 9,002.59 -671.00 -3,511.64 5,967,579.64 653,742.44 70°19'6.075 N 148°45'13.22 W 10,275.59 74.20 144.29 9,011.32 -696.49 -3,496.04 5,967,554.48 653,758.57 70°19'5.824 N 148°45'12.76 W 10,304.63 75.96 135.55 9,018.82 -717.93 -3,477.98 5,967,533.42 653,777.07 70°19'5.613 N 148°45 12.23 W 10,334.64 75.77 128.38 9,026.15 -737.38 -3,456.36 5,967,514.43 653,799.09 70°19'5.422 N 148°45'11.60 W 10,364.21 76.28 119.78 9,033.31 -753.44 -3,432.62 5,967,498.88 653,823.17 70°19'5.264 N 148°45'10.91 W 10,394.71 78.28 111.96 9,040.03 -766.40 -3,405.87 5,967,486.48 653,850.18 70°19'5.137 N 148°45'10.13 W 10,424.65 82.40 106.62 9,045.06 -776.14 -3,378.02 5,967,477.33 653,878.22 70°19'5.041 N 148°45'9.32 W 10,454.71 86.75 113.03 9,047.90 -786.28 -3,349.89 5,967,467.77 653,906.55 70°19'4.941 N 148°45'8.49 W 10,488.67 92.58 120.37 9,048.10 -801.53 -3,319.59 5,967,453.17 653,937.17 70°19'4.792 N 148°45'7.61 W 10,516.31 95.31 127.29 9,046.20 -816.87 -3,296.70 5,967,438.32 653,960.37 70°19'4.641 N 148°45'6.94 W 10,544.71 96.74 136.90 9,043.21 -835.77 -3,275.77 5,967,419.85 653,981.70 70°19'4.455 N 148°45'6.33 W 10,564.36 94.27 133.77 9,041.32 -849.68 -3,262.02 5,967,406.24 653,995.73 70°19'4.318 N 148°45'5.93 W 10,594.73 93.53 126.42 9,039.26 -869.18 -3,238.86 5,967,387.23 654,019.29 70°19'4.127 N 148°45'5.25 W 10,624.85 92.18 123.32 9,037.76 -886.38 -3,214.18 5,967,370.55 654,044.33 70°19'3.958 N 148°45'4.53 W 10,654.71 92.06 119.09 9,036.65 -901.83 -3,188.66 5,967,355.64 654,070.16 70°19'3.806 N 148°45'3.79 W 10,684.65 90.86 116.23 9,035.89 -915.73 -3,162.15 5,967,342.30 654,096.95 70°19'3.669 N 148°45'3.02 W 10,714.64 89.39 113.71 9,035.82 -928.38 -3,134.97 5,967,330.22 654,124.39 70°19'3.545 N 148°45'2.22 W 10,744.25 90.06 110.50 9,035.96 -939.53 -3,107.54 5,967,319.65 654,152.04 70°19'3.435 N 148°45'1.42 W 10,774.85 89.63 107.05 9,036.05 -949.37 -3,078.57 5,967,310.42 654,181.21 70°19'3.339 N 148°45'0.58 W 10,804.71 86.81 104.91 9,036.97 -957.59 -3,049.89 5,967,302.80 654,210.06 70°19'3.258 N 148°44'59.74 W 10,834.65 89.05 101.46 9,038.06 -964.41 -3,020.76 5,967,296.59 654,239.32 70°19'3.191 N 148°44'58.89 W 10,864.51 91.38 98.38 9,037.94 -969.55 -2,991.35 5,967,292.07 654,268.83 70°19'3.140 N 148°44'58.03 W 10,894.75 91.63 95.70 9,037.15 -973.26 -2,961.35 5,967,288.99 654,298.90 70°19'3.104 N 148°44'57.16 W 10,924.77 91.66 91.98 9,036.29 -975.27 -2,931.42 5,967,287.61 654,328.86 70°19'3.085 N 148°44'56.28 W 10,954.73 91.94 88.61 9,035.35 -975.42 -2,901.48 5,967,288.08 654,358.80 70°19'3.083 N 148°44'55.41 W 10,984.67 91.10 84.91 9,034.55 -973.73 -2,871.60 5,967,290.40 654,388.63 70°19'3.100 N 148°44'54.54 W 11,016.23 90.43 82.48 9,034.13 -970.26 -2,840.24 5,967,294.52 654,419.91 70°19'3.134 N 148°44'53.62 W 11,044.53 90.61 79.11 9,033.87 -965.74 -2,812.31 5,967,299.63 654,447.74 70°19'3.179 N 148°44'52.81 W 11,074.44 90.15 75.93 9,033.67 -959.28 -2,783.11 5,967,306.70 654,476.80 70°19'3.242 N 148°44'51.95 W 11,105.24 90.18 74.97 9,033.59 -951.54 -2,753.30 5,967,315.06 654,506.44 70°19'3.319 N 148°44'51.09 W 11,134.65 90.98 78.86 9,033.29 -944.88 -2,724.66 5,967,322.32 654,534.93 70°19'3.384 N 148°44'50.25 W 11,164.69 91.08 82.70 9,032.75 -940.07 -2,695.02 5,967,327.75 654,564.46 70°19'3.432 N 148°44'49.38 W 11,194.83 90.52 86.89 9,032.33 -937.34 -2,665.01 5,967,331.11 654,594.40 70°19'3.459 N 148°44'48.51 W 11,224.79 90.31 91.35 9,032.11 -936.88 -2,635.06 5,967,332.20 654,624.33 70°19'3.463 N 148°44'47.64 W 11,254.76 90.55 95.84 9,031.88 -938.76 -2,605.16 5,967,330.95 654,654.26 70°19'3.445 N 148°44'46.76 W 11,284.87 89.29 98.51 9,031.93 -942.52 -2,575.29 5,967,327.81 654,684.20 70°19'3.408 N 148°44'45.89 W 11,314.93 88.80 103.81 9,032.43 -948.33 -2,545.81 5,967,322.62 654,713.79 70°19'3.351 N 148°44'45.03 W 11/11/2014 2:41:45PM Page 3 COMPASS 5000.1 Build 61 ri- . bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-15-Slot 15 Project: Prudhoe Bay TVD Reference: G-15 @ 75.63usft Site: PB G Pad MD Reference: G-15 @ 75.63usft Well: G-15 North Reference: True Wellbore: G-15C Survey Calculation Method: Minimum Curvature Design: G-15C Database: EDMRSK-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 11,344.77 88.37 103.15 9,033.17 -955.28 -2,516.80 5,967,316.27 654,742.94 70°19'3.283 N 148°44'44.18 W 11,374.91 89.72 100.28 9,033.67 -961.40 -2,487.30 5,967,310.78 654,772.56 70°19'3.222 N 148°44'43.32 W 11,407.41 90.49 95.84 9,033.61 -965.96 -2,455.13 5,967,306.89 654,804.82 70°19'3.178 N 148°44'42.39 W 11,434.90 89.51 91.31 9,033.61 -967.67 -2,427.70 5,967,305.76 654,832.28 70°19'3.161 N 148°44'41.58 W 11,465.04 89.29 87.96 9,033.92 -967.48 -2,397.57 5,967,306.58 654,862.40 70°19'3.163 N 148°44'40.71 W 11,494.41 89.42 84.16 9,034.25 -965.46 -2,368.27 5,967,309.21 654,891.64 70°19'3.183 N 148°44'39.85 W 11,534.63 88.62 79.15 9,034.94 -959.63 -2,328.50 5,967,315.88 654,931.28 70°19'3.240 N 148°44'38.69 W 11,565.67 89.57 74.54 9,035.43 -952.57 -2,298.28 5,967,323.57 654,961.34 70°19'3.310 N 148°44'37.81 W 11,596.92 91.05 71.44 9,035.26 -943.43 -2,268.41 5,967,333.33 654,991.02 70°19'3.400 N 148°44'36.94 W 11,625.75 91.47 69.74 9,034.63 -933.85 -2,241.22 5,967,343.48 655,017.99 70°19'3.494 N 148°44'36.14 W 11,655.86 90.58 65.90 9,034.09 -922.49 -2,213.35 5,967,355.42 655,045.62 70°19'3.606 N 148°44'35.33 W 11,685.97 89.97 70.35 9,033.95 -911.27 -2,185.42 5,967,367.22 655,073.31 70°19'3.716 N 148°44'34.52 W 11,719.43 88.22 74.72 9,034.48 -901.23 -2,153.51 5,967,377.92 655,104.99 70°19'3.815 N 148°44'33.59 W 11,745.71 89.11 78.29 9,035.09 -895.10 -2,127.97 5,967,384.58 655,130.40 70°19'3.876 N 148°44'32.84 W 11,778.73 89.85 83.35 9,035.39 -889.84 -2,095.38 5,967,390.53 655,162.87 70°19'3.927 N 148°44'31.89 W 11,805.47 89.20 86.71 9,035.61 -887.52 -2,068.75 5,967,393.40 655,189.44 70°19'3.950 N 148°44'31.11 W 11,836.09 90.00 90.90 9,035.82 -886.88 -2,038.14 5,967,394.68 655,220.03 70°19'3.957 N 148°44'30.22 W 11,846.65 89.69 92.26 9,035.85 -887.17 -2,027.59 5,967,394.61 655,230.59 70°19'3.954 N 148°44'29.91 W 11,888.50 89.69 92.26 9,036.08 -888.82 -1,985.77 5,967,393.84 655,272.43 70°19'3.938 N 148°44'28.69 W Projection to TD 11/11/2014 2:41:45PM Page 4 COMPASS 5000.1 Build 61 Liff,d''''- bP Survey Report-Geographic BAKER 0.0. HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-15-Slot 15 Project: Prudhoe Bay ND Reference: G-15 @ 75.63usft Site: PB G Pad MD Reference: G-15 @ 75.63usft Well: G-15 North Reference: True Wellbore: G-15C Survey Calculation Method: Minimum Curvature Design: G-15C Database: EDM R5K-Alaska PROD-ANCP1 Targets Target Name -hit/miss target Dip Angle Dip Dir. ND +N/-S +El-W Northing Easting -Shape (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude G-15C T4 0.00 0.00 9,040.63 -944.08 -2,205.42 5,967,334.00 655,054.00 70°19'3.394 N 148'44'35 10 W' -actual wellpath misses target center by 23.87usft at 11654.94usft MD(9034.10 TVD,-922.86 N,-2214.19 E) -Point Drilling Polygon 0.00 0.00 0.03 -1,471.27 -968.71 5,966,832.87 656,301.39 70°18'58.211 N 148°43'59.01 W -actual wellpath misses target center by 9111.74usft at 11888.50usft MD(9036.08 TVD,-888.82 N,-1985.77 E) -Polygon Point 1 0.03 695.54 -2,301.49 5,967,480.00 653,986.00 Point 2 0.03 683.73 -1,737.57 5,967,480.00 654,550.00 Point 3 0.03 645.14 -1,328.26 5,967,450.00 654,960.00 Point4 0.03 820.58 -153.25 5,967,650.00 656,131.00 Point 5 0.03 702.86 -72.69 5,967,534.00 656,214.00 Point 6 0.03 652.29 -475.86 5,967,475.00 655,812.00 Point7 0.03 401.92 -1,607.44 5,967,201.00 654,686.00 ' Point 8 0.03 357.77 -2,221.54 5,967,144.00 654,073.00 Point 9 0.03 695.54 -2,301.49 5,967,480.00 653,986.00 I G-15C T1 0.00 0.00 9,047.63 -788.12 -3,394.50 5,967,465.00 653,862.00 70°19'4.923 N 148°45'9.80 W -actual wellpath misses target center by 16.97usft at 10413.65usft MD(9043.46 TVD,-772.85 N,-3388.40 E) -Point G-15C T3 0.00 0.00 9,040.63 -935.30 -2,958.45 5,967,327.00 654,301.00 70°19'3.477 N 148°44'57.07 W -actual wellpath misses target center by 38.22usft at 10892.88usft MD(9037.20 TVD,-973.07 N,-2963.21 E) -Point G-15C T2 0.00 0.00 9,039.63 -835.44 -3,284.46 5,967,420.00 653,973.00 70°19'4.458 N 148°45'6.58 W -actual wellpath misses target center by 7.39usft at 10538.45usft MD(9043.93 ND,-831.31 N,-3280.10 E) -Point G-15C T5 0.00 0.00 9,035.63 -831.17 -1,721.91 5,967,457.00 655,535.00 70°19'4.505 N 148°44'20.99 W -actual wellpath misses target center by 270.08usft at 11888.50usft MD(9036.08 TVD,-888.82 N,-1985.77 E) -Point Formations l Measured Vertical Dip Depth Depth Dip Direction (usft) (usft) Name Lithology (1 (1 9,817.00 8,772.69 IVISHAK(SADLEROCHIT SAND(MED),CHERTY 9,875.00 8,817.91 IVISHAK(SADLEROCHIT SANDSTONE,MEDIUM 10,050.00 8,928.03 IVISHAK(SADLEROCHIT SAND,FINE 10,300.00 9,017.68 IVISHAK(SADLEROCHIT SANDSTONE Design Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (usft) (usft) (usft) (usft) Comment 9,792.92 8,752.77 -399 01 -3,405.03 TIP 9,811.00 8,767.77 -399 84 -3,415.09 KOP 9,844.31 8,794.62 -402.13 -3,434.64 Interpolated Azimuth 11,888.50 9,036.08 -888.82 -1,985.77 Projection to TD Checked By: Approved By: Date: 11/11/2014 2:41:45PM Page 5 COMPASS 5000.1 Build 61 21 4126 16 688 RECEIVED bp AH 10 2015 AOGCO North America - ALASKA - BP Prudhoe Bay PB G Pad G-15 - Slot 15 500292064700 G-15C Design: G-15C Survey Report - Geographic 11 November, 2014 BAKER HUGHES 0. E- t bpySurvey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-15-Slot 15 Project: Prudhoe Bay ND Reference: G-15 @ 75.63usft Site: PB G Pad MD Reference: G-15 @ 75.63usft Well: G-15 North Reference: True Wellbore: G-15C Survey Calculation Method: Minimum Curvature Design: G-15C Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB G Pad,TR-11-13 'Site Position: Northing: 5,966,832.87 usft Latitude: 70°18'58.211 N From: Map Easting: 656,301.39 usft Longitude: 148°43'59.01 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.19° Well G-15 API No. 500292064700 Well Position +N/-S 0.00 usft Northing: 5,968,324.00 usft Latitude: 70°19'12.682 N +E/-W 0.00 usft Easting: 657,239.00 usft Longitude: 148°43'30.75 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 40.29 usft Wellbore G-15C API no. 500292064703 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2013 9/1/2014 19.62 81.01 57,625 Design G-15C Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9.792 92 Vertical Section: Depth From(ND) +N/-5 +E/-W Direction (usft) (usft) (usft) (°) 35.34 0 00 0.00 245.89 Survey Program Date: 11/11/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 9,500.00 1 :Sperry-Sun BOSS gyro multi(G-15) BOSS-GYRO Sperry-Sun BOSS gyro multishot 9,524.00 9,792.92 MWD(G-15B) MWD MWD-Standard 9,811.00 9,844.31 Inc+Trend(G-15C) INC+TREND Inclinometer+known azi trend 9,874.35 11,846.65 MWD(G-15C) MWD MWD-Standard 11/11/2014 2:41:45PM Page 2 COMPASS 5000.1 Build 61 200. Id-- bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-15-Slot 15 Project: Prudhoe Bay TVD Reference: G-15 @ 75.63usft Site: PB G Pad MD Reference: G-15 @ 75.63usft Well: G-15 North Reference: True Wellbore: G-15C Survey Calculation Method: Minimum Curvature Design: G-15C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,792.92 33.33 263.05 8,752.77 -399.01 -3,405.03 5,967,853.78 653,843.32 70°19'8.750 N 148°45'10.11 W TIP 9,811.00 34.58 267.45 8,767.77 -399.84 -3,415.09 5,967,852.74 653,833.28 70°19'8.742 N 148°45'10.40 W KOP 9,844.31 38.05 259.56 8,794.62 -402.13 -3,434.64 5,967,850.04 653,813.78 70°19'8.719 N 148°45'10.97 W Interpolated Azimuth 9,874.35 43.12 253.65 8,817.44 -406.70 -3,453.62 5,967,845.08 653,794.91 70°19'8.674 N 148°45'11.53 W 9,904.33 47.93 245.45 8,838.45 -414.22 -3,473.60 5,967,837.14 653,775.09 70°19'8.600 N 148°45 12.11 W 9,941.79 50.39 231.97 8,863.01 -428.93 -3,497.68 5,967,821.93 653,751.32 70°19'8.455 N 148°45'12.81 W 9,974.40 50.69 220.22 8,883.78 -446.33 -3,515.76 5,967,804.15 653,733.62 70°19'8.284 N 148°45'13.34 W 10,004.40 54.09 210.90 8,902.11 -465.65 -3,529.51 5,967,784.55 653,720.27 70°19'8.094 N 148°45'13.74 W 10,034.49 55.72 200.79 8,919.44 -487.77 -3,540.20 5,967,762.21 653,710.05 70°19'7.876 N 148°45'14.05 W 10,065.66 58.52 191.45 8,936.39 -512.88 -3,547.42 5,967,736.96 653,703.35 70°19'7.629 N 148°45'14.26 W 10,094.69 62.03 181.13 8,950.81 -537.89 -3,550.14 5,967,711.90 653,701.16 70°19'7.383 N 148°45'14.34 W 10,124.61 66.41 173.05 8,963.84 -564.76 -3,548.74 5,967,685.07 653,703.12 70°19'7.119 N 148°45'14.30 W 10,155.93 69.36 167.22 8,975.63 -593.32 -3,543.76 5,967,656.62 653,708.70 70°19'6.838 N 148°45'14.15 W 10,184.69 71.73 158.11 8,985.23 -619.17 -3,535.67 5,967,630.95 653,717.33 70°19'6.584 N 148°45'13.92 W 10,214.88 73.71 154.79 8,994.20 -645.59 -3,524.15 5,967,604.78 653,729.40 70°19'6.324 N 148°45'13.58 W 10,244.42 73.30 152.78 9,002.59 -671.00 -3,511.64 5,967,579.64 653,742.44 70°19'6.075 N 148°45'13.22 W 10,275.59 74.20 144.29 9,011.32 -696.49 -3,496.04 5,967,554.48 653,758.57 70°19'5.824 N 148°45'12.76 W 10,304.63 75.96 135.55 9,018.82 -717.93 -3,477.98 5,967,533.42 653,777.07 70°19'5.613 N 148°45'12.23 W 10,334.64 75.77 128.38 9,026.15 -737.38 -3,456.36 5,967,514.43 653,799.09 70°19'5.422 N 148°45 11.60 W 10,364.21 76.28 119.78 9,033.31 -753.44 -3,432.62 5,967,498.88 653,823.17 70°19'5.264 N 148°45'10.91 W 10,394.71 78.28 111.96 9,040.03 -766.40 -3,405.87 5,967,486.48 653,850.18 70°19'5.137 N 148°45'10.13 W 10,424.65 82.40 106.62 9,045.06 -776.14 -3,378.02 5,967,477.33 653,878.22 70°19'5.041 N 148°45'9.32 W 10,454.71 86.75 113.03 9,047.90 -786.28 -3,349.89 5,967,467.77 653,906.55 70°19'4.941 N 148°45'8.49 W 10,488.67 92.58 120.37 9,048.10 -801.53 -3,319.59 5,967,453.17 653,937.17 70°19'4.792 N 148°45'7.61 W 10,516.31 95.31 127.29 9,046.20 -816.87 -3,296.70 5,967,438.32 653,960.37 70°19'4.641 N 148°45'6.94 W 10,544.71 96.74 136.90 9,043.21 -835.77 -3,275.77 5,967,419.85 653,981.70 70°19'4.455 N 148°45'6.33 W 10,564.36 94.27 133.77 9,041.32 -849.68 -3,262.02 5,967,406.24 653,995.73 70°19'4.318 N 148°45'5.93 W 10,594.73 93.53 126.42 9,039.26 -869.18 -3,238.86 5,967,387.23 654,019.29 70°19'4.127 N 148°45'5.25 W 10,624.85 92.18 123.32 9,037.76 -886.38 -3,214.18 5,967,370.55 654,044.33 70°19'3.958 N 148°45 4.53 W 10,654.71 92.06 119.09 9,036.65 -901.83 -3,188.66 5,967,355.64 654,070.16 70°19'3.806 N 148°45'3.79 W 10,684.65 90.86 116.23 9,035.89 -915.73 -3,162.15 5,967,342.30 654,096.95 70°19'3.669 N 148°45'3.02 W 10,714.64 89.39 113.71 9,035.82 -928.38 -3,134.97 5,967,330.22 654,124.39 70°19'3.545 N 148°45'2.22 W 10,744.25 90.06 110.50 9,035.96 -939.53 -3,107.54 5,967,319.65 654,152.04 70°19'3.435 N 148°45 1.42 W 10,774.85 89.63 107.05 9,036.05 -949.37 -3,078.57 5,967,310.42 654,181.21 70°19'3.339 N 148°45'0.58 W 10,804.71 86.81 104.91 9,036.97 -957.59 -3,049.89 5,967,302.80 654,210.06 70°19'3.258 N 148°44'59.74 W 10,834.65 89.05 101.46 9,038.06 -964.41 -3,020.76 5,967,296.59 654,239.32 70°19'3.191 N 148°44'58.89 W 10,864.51 91.38 98.38 9,037.94 -969.55 -2,991.35 5,967,292.07 654,268.83 70°19'3.140 N 148°44'58.03 W 10,894.75 91.63 95.70 9,037.15 -973.26 -2,961.35 5,967,288.99 654,298.90 70°19'3.104 N 148°44'57.16 W 10,924.77 91.66 91.98 9,036.29 -975.27 -2,931.42 5,967,287.61 654,328.86 70°19'3.085 N 148°44'56.28 W 10,954.73 91.94 88.61 9,035.35 -975.42 -2,901.48 5,967,288.08 654,358.80 70°19'3.083 N 148°44'55.41 W 10,984.67 91.10 84.91 9,034.55 -973.73 -2,871.60 5,967,290.40 654,388.63 70°19'3.100 N 148°44'54.54 W 11,016.23 90.43 82.48 9,034.13 -970.26 -2,840.24 5,967,294.52 654,419.91 70°19'3.134 N 148°44'53.62 W 11,044.53 90.61 79.11 9,033.87 -965.74 -2,812.31 5,967,299.63 654,447.74 70°19'3.179 N 148°44'52.81 W 11,074.44 90.15 75.93 9,033.67 -959.28 -2,783.11 5,967,306.70 654,476.80 70°19'3.242 N 148°44'51.95 W 11,105.24 90.18 74.97 9,033.59 -951.54 -2,753.30 5,967,315.06 654,506.44 70°19'3.319 N 148°44'51.09 W 11,134.65 90.98 78.86 9,033.29 -944.88 -2,724.66 5,967,322.32 654,534.93 70°19'3.384 N 148°44'50.25 W 11,164.69 91.08 82.70 9,032.75 -940.07 -2,695.02 5,967,327.75 654,564.46 70°19'3.432 N 148°44'49.38 W 11,194.83 90.52 86.89 9,032.33 -937.34 -2,665.01 5,967,331.11 654,594.40 70°19'3.459 N 148°44'48.51 W 11,224.79 90.31 91.35 9,032.11 -936.88 -2,635.06 5,967,332.20 654,624.33 70°19'3.463 N 148°44'47.64 W 11,254.76 90.55 95.84 9,031.88 -938.76 -2,605.16 5,967,330.95 654,654.26 70°19'3.445 N 148°44'46.76 W 11,284.87 89.29 98.51 9,031.93 -942.52 -2,575.29 5,967,327.81 654,684.20 70°19'3.408 N 148°44'45.89 W 11,314.93 88.80 103.81 9,032.43 -948.33 -2,545.81 5,967,322.62 654,713.79 70°19'3.351 N 148°44'45.03 W 11/11/2014 2:41:45PM Page 3 COMPASS 5000.1 Build 61 INT- bp Survey Report-Geographic BAKER 1.0. HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-15-Slot 15 Project: Prudhoe Bay TVD Reference: G-15 @ 75.63usft Site: PB G Pad MD Reference: G-15 @ 75.63usft Well: G-15 North Reference: True Wellbore: G-15C Survey Calculation Method: Minimum Curvature Design: G-15C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 11,344.77 88.37 103.15 9,033.17 -955.28 -2,516.80 5,967,316.27 654,742.94 70°19'3.283 N 148°44'44.18 W 11,374.91 89.72 100.28 9,033.67 -961.40 -2,487.30 5,967,310.78 654,772.56 70°19'3.222 N 148°44'43.32 W 11,407.41 90.49 95.84 9,033.61 -965.96 -2,455.13 5,967,306.89 654,804.82 70°19'3.178 N 148°44'42.39 W 11,434.90 89.51 91.31 9,033.61 -967.67 -2,427.70 5,967,305.76 654,832.28 70°19'3.161 N 148°44'41.58 W 11,465.04 89.29 87.96 9,033.92 -967.48 -2,397.57 5,967,306.58 654,862.40 70°19'3.163 N 148°44'40.71 W 11,494.41 89.42 84.16 9,034.25 -965.46 -2,368.27 5,967,309.21 654,891.64 70°19'3.183 N 148°44'39.85 W 11,534.63 88.62 79.15 9,034.94 -959.63 -2,328.50 5,967,315.88 654,931.28 70°19'3.240 N 148°44'38.69 W 11,565.67 89.57 74.54 9,035.43 -952.57 -2,298.28 5,967,323.57 654,961.34 70°19'3.310 N 148°44'37.81 W 11,596.92 91.05 71.44 9,035.26 -943.43 -2,268.41 5,967,333.33 654,991.02 70°19'3.400 N 148°44'36.94 W 11,625.75 91.47 69.74 9,034.63 -933.85 -2,241.22 5,967,343.48 655,017.99 70°19'3.494 N 148°44'36.14 W 11,655.86 90.58 65.90 9,034.09 -922.49 -2,213.35 5,967,355.42 655,045.62 70°19'3.606 N 148°44'35.33 W 11,685.97 89.97 70.35 9,033.95 -911.27 -2,185.42 5,967,367.22 655,073.31 70°19'3.716 N 148°44'34.52 W 11,719.43 88.22 74.72 9,034.48 -901.23 -2,153.51 5,967,377.92 655,104.99 70°19'3.815 N 148°44'33.59 W 11,745.71 89.11 78.29 9,035.09 -895.10 -2,127.97 5,967,384.58 655,130.40 70°19'3.876 N 148°44'32.84 W 11,778.73 89.85 83.35 9,035.39 -889.84 -2,095.38 5,967,390.53 655,162.87 70°19'3.927 N 148°44'31.89 W 11,805.47 89.20 86.71 9,035.61 -887.52 -2,068.75 5,967,393.40 655,189.44 70°19'3.950 N 148°44'31.11 W 11,836.09 90.00 90.90 9,035.82 -886.88 -2,038.14 5,967,394.68 655,220.03 70°19'3.957 N 148°44'30.22 W 11,846.65 89.69 92.26 9,035.85 -887.17 -2,027.59 5,967,394.61 655,230.59 70°19'3.954 N 148°44'29.91 W 11,888.50 89.69 92.26 9,036.08 -888.82 -1,985.77 5,967,393.84 655,272.43 70°19'3.938 N 148°44'28.69 W Projection to TD 11/11/2014 2:41:45PM Page 4 COMPASS 5000.1 Build 61 Fa Ibp Survey Report-Geographic BAKER •"' HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-15-Slot 15 Project: Prudhoe Bay TVD Reference: G-15 @ 75.63usft Site: PB G Pad MD Reference: G-15 @ 75.63usft Well: G-15 North Reference: True Wellbore: G-15C Survey Calculation Method: Minimum Curvature Design: G-15C Database: EDM R5K-Alaska PROD-ANCP1 Targets Target Name -hit/miss target Dip Angle Dip Dir. TVD +N/-S +E/-W Northing Easting -Shape (1 (1 (usft) (usft) (usft) (usft) (usft) Latitude Longitude G-15C T4 0.00 0.00 9,040.63 -944.08 -2,205.42 5,967,334.00 655,054.00 70°19'3.394 N 148°44'35.10 W -actual wellpath misses target center by 23.87usft at 11654.94usft MD(9034.10 TVD,-922.86 N,-2214.19 E) -Point Drilling Polygon 0.00 0.00 0.03 -1,471.27 -968.71 5,966,832.87 656,301.39 70°18'58.211 N 148°43'59.01 W -actual wellpath misses target center by 9111.74usft at 11888.50usft MD(9036.08 TVD,-888.82 N,-1985.77 E) -Polygon Point 1 0.03 695.54 -2,301.49 5,967,480.00 653,986.00 Point 2 0.03 683.73 -1,737.57 5,967,480.00 654,550.00 Point 3 0.03 645.14 -1,328.26 5,967,450.00 654,960.00 Point4 0.03 820.58 -153.25 5,967,650.00 656,131.00 Point 5 0.03 702.86 -72.69 5,967,534.00 656,214.00 Point 6 0.03 652.29 -475.86 5,967,475.00 655,812.00 Point 7 0.03 401.92 -1,607.44 5,967,201.00 654,686.00 Point 8 0.03 357.77 -2,221.54 5,967,144.00 654,073.00 Point 9 0.03 695.54 -2,301.49 5,967,480.00 653,986.00 G-15C T1 0.00 0.00 9,047.63 -788.12 -3,394.50 5,967,465.00 653,862.00 70°19'4.923 N 148°45'9.80 W -actual wellpath misses target center by 16.97usft at 10413.65usft MD(9043.46 TVD,-772.85 N,-3388.40 E) -Point G-15C T3 0.00 0.00 9,040.63 -935.30 -2,958.45 5,967,327.00 654,301.00 70°19'3.477 N 148°44'57.07 W -actual wellpath misses target center by 38.22usft at 10892.88usft MD(9037.20 TVD,-973.07 N,-2963.21 E) -Point G-15C T2 0.00 0.00 9,039.63 -835.44 -3,284.46 5,967,420.00 653,973.00 70°19'4.458 N 148°45'6.58 W -actual wellpath misses target center by 7.39usft at 10538.45usft MD(9043.93 TVD,-831.31 N,-3280.10 E) -Point G-15C T5 0.00 0.00 9,035.63 -831.17 -1,721.91 5,967,457.00 655,535.00 70°19'4.505 N 148°44'20.99 W -actual wellpath misses target center by 270.08usft at 11888.50usft MD(9036.08 TVD,-888.82 N,-1985.77 E) -Point 1 Formations Measured Vertical Dip Depth Depth Dip Direction (usft) (usft) Name Lithology (1 (°) 9,817.00 8,772.69 IVISHAK(SADLEROCHIT SAND(MED),CHERTY 9,875.00 8,817.91 IVISHAK(SADLEROCHIT SANDSTONE,MEDIUM 10,050.00 8,928.03 IVISHAK(SADLEROCHIT SAND,FINE 10,300.00 9,017.68 IVISHAK(SADLEROCHIT SANDSTONE Design Annotations Measured Vertical Local Coordinates i Depth Depth +N/-S +E/-W (usft) (usft) (usft) (usft) Comment 9,792.92 8,752.77 -399.01 -3,405.03 TIP 9,811.00 8,767.77 -399.84 -3,415.09 KOP 9,844.31 8,794.62 -402.13 -3,434.64 Interpolated Azimuth 11,888.50 9,036.08 -888.82 -1,985.77 Projection to TD Checked By: Approved By: Date: 11/11/2014 2:41:45PM Page 5 COMPASS 5000.1 Build 61 Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ca,11.4. - I a c, Well History File Identifier Organizing(done) ❑ Two-sided ❑ Rescan Needed RES AN: OVERSIZED: NOTES: Col r Items: ❑ Maps: rayscale Items: Igs: ❑ Poor Quality Originals: ❑ Other: ❑ Other: BY: Ma "Thria Date: 3 ` /r /s/ Project Proofing BY: denDate: 3 'i S /s/ io Scanning Preparation ca, x 30 = 100 + 1' = TOTAL PAGES (0 I (Count does not include cover sheet) Ill4 BY: Maria Date:3 j c� r,� /s/ Production Scanning Stage 1 Page Count from Scanned File: %I.. (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: V. YES NO BY: deftDate: 3/1 C11/5 /s/ rvip Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Stage 2 Additional Well Reports: YES NO TOTAL PAGES: Digital version appended by: Meredith Michal Date: /s/ Final Page Count: Stage 1 + Stage 2: TOTAL PAGES: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: /s/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc o L o • H , • o N UI o r. o UI g UIQ UIQ o I wI WI wwl z CO•ct Z �, �, ; �,g o m, LI LT_ (11 J I 2 o� U_ (I 2 0 2 0 2 0aa) •a U 1- Q Q Q N• p m pI pI pl a°i aoi aoi n (� z z z co m CO s co m cq N O LL b U) 0 a a~ a2 o CO 0 oX o Oa �I 01 U)I °o C aa) m 6 .o 6'p ai c 01 0I 0I o Z o O u) 2 co 2 Z Z ?� E d ELL E'o U n U U J D E U > U) co co c co co n I ca c I > F a a N d a a.) a)ca w aa) N < N_ I N I Q Co co W JI LL JI LL—I,o co 0IC 0IC 01C co LLW U I-- U,- .U to CD N N m N C I m E m m O a)LL I N O ,- N J ° o U) Cl. u)0- () o a~.. LL a' I COQ tv O`- WU Q C N ca a) co,C co:.. C C C O ca Z O IO LL 0 o o c co c m c co :° ai'o ai'o ai•o 0 m- co E ai coE 1)- m Z o E O 0�I au) 6=0- Ex W Y dcn OLLI ii`Im it m ii �-d • co a o ti .0v .c.).4-• o co o co o as o0 0 0 o I o N Y .z. y C CO m �p �p �J 'EJ �J roW O 'Ea'~ perp 2 o co o I N N I I I N_p J U o U U r < J V '00(.1 co a) a) aoi 0 aoio a)O .5O �W (DoI� (Dolml �LI=I �OII Ce Q EO W 0 N W O W O W N W N W N N I W. Y W COIW .— m W ICO O Z y j 0 O O O O 0 0 O O 0 W f0 O N N N N N N N N N N CO V M CO CO COM CO CO CO CO CO ^I 0 M M M M W x W J I _ V m o o0 Z 8 - co < o 0 co co v co ti o aco`a) s co o00o coo o co CL 0 co oI " c C o Z (5 V co 7 O O o 0 a) co 0co 5.N-1 a a) E n M V M 0 @ 0 N c J0fCO Qin to2. th 16 0 5 Z 0 a_ J2 MG Q m N J0 41 W o 0 co To J co O a) cc Cl) 0 v' 0 0 0 LU Q a oce ce Q o ? E o ZI 0 Q a> U o >0 c E Jco -co co Z C co N a) ca c0 co co co co -o co a7 ca co co c E 0 O 0 O 0 0 ai O O 0 0 C) Z 7 m m m m m 2 o m m m � cn _2 .2 co .2 •' rn rn 'rn 5 rn rn 0o Z 00) 0 O 0 0 0 0 _I o O O a co > 0 °' ai 0 o o O o 0 o co co co co N I- as 10 LU LU LU LU LU 10 U) U) o CO Q Z 'Cr) c d LZ io E N N N N N N 10 LU LU LU 10 N 2 CL O 6 O w o z N N N N N N N N N N N a o E E LL V , R •` W 17.Z CG -c w �,, LL .2 O Z - p 0 2 U 0 0 0 0 0 0 0 0 0 0 U E 5 a w —I © a 2 Ui 4 3 � o � w pW pW 0 0 0 ° 0 0 0 w O - 0 01 = 01 01 C��`J I.- O 'G W ml F W w 0 ® , t O v •a- a> Z J1 j N UI J1 JI OJ N ca U Z vi y vi U CO Z Z cn co C LL N N NI LL LL d T 'O O 1 COc° co I I C7 o c0 c IO 3 7 7 N CO 0 0 ~ y Oa Q 1. C 1 U 0 Y a O I z n Z` • 0 a ' c c c LI 0 �I n > o � 0 d 2 N it LL LLI LOI w@„ a1 N Q 11 Cl) Cl) O I- 0 0 0 J -,- U U F m 2 U up Lc> Lo Q CO a N C9 V W U U J 6CC' th th th tE c1 O O OU O',2 I 0 i l a) 01 LL a) a) a) a)>- a) m a) a) a)W a) co D ? �LLctd LL LL it LL j LL n LL LL LL� LLt O C y I Y v v v cv v cv v 01 Y Y a rn \ q c F c c c c D c Lo' c c c a)F c c[F 0 W E to m 200 o 0 o Oco oN o 0 0ce10 °OU N0 E >- >- Ce 4 � N uI II N N N N Lo N Lo N 0 N I N LI I1 v W r0� «� co d W a- CO W W W W ' W .- W W W ICO CO 0coLL O U )I') up COcc) u) u) U) c!) lc) cc) U) c0 4) a) 0. 0 0 0 0 0 0 0 0 0 0 Ern O) D Wq N N N N N N N N N N 0 N ¢ co co (o CO co co Co Co co co H Z yj N ce rn OJ M M M M M c� c75 ch ch ch a) m a LE E /W X w a rn cc aa)) V a J CO ° n CO O E 3 E co Z - u re u °? co o a' Q (0V) O I J °p_ m J d 3 a E :r a m = 0 A o vi c M 0 0 li N C o 0 N 0 0 G T °- O N;, o M U eh 0 E1'r_) wp I G c) Q ,- cml a.o co Z o cn CO m o F E I .T 3 O a) S ��//�� = co u) v N c v/ p 0 c c ° QCL c m TO O m IL a) c c a Q c a o as 0 D 713 Z T co Z E coc as CO Co Co Co CO CO CO m CO 63 m CO CO CO CO CO CO CO CO CO CO CO / CD 0 0 0 0 0 0 0 0 O O aa) c iv\ O w W @ To m To To To To �o I O co (i) C 0 IID 0 0 0 0 0 0 0 0 0 J € p c CoIc0 c0 CD c0c0 CO CD CO CO CO .2 W 1 Y N F ao co co ao co m w co co co 00 c W co a re O T v v v v v v v v v v v er Lo to up to up up up up up up up N N N N N N N N N N N N m W O N Z. o Q: O —` � _ E E Z ani a w oco co c0 18 Z Q o o Q U �, '— U 0 0 0 0 0 0 0 0 0 0 l O 2 N i) m Jd L, V O c -0 o 2 0 d 0 i0 0 0 0 0 0 0 0 0 0 c d LL ° 2 ) I O 0. 2 w w w w w w w w w w _ 3 Z 0 a 0 0 0 trl o 0 M N O p nO 3 O V N Z A o) U_ C%1 v in V' o aZ ti` Q J O O z ui LL aci O azt �MI / 5• U LCL OJ 0. W w V 0.• o Z Q • N d = J Q a 0 U) I) 0 0 • N7).. C) E w M ° w. NNO <� U c E M o o E u Q 0 0 o, `l''' 0 cr ~ 1 z o C = N c Q N M m o p O a ) a) ill U) p p G Qctoilk a a) Q o ° z E 0 ZuU co z u .4- 3 3 b O N OD O N 0 oo — 5 N > .O el.- d 3 N N N > o re •�' 000 0 +ai c d D co C aJ 0 N o .2 q o C C v • 'a) O G � d A C.J T:). m o E a Q) O 0 o m E E ¢ a 2 o cc Cl 0 i 0 214126 RECEIVED 25 48 6 MAR 0 6 2015 Letter of Transmittal AOGCC BAKER Date: DATA LOGGED March 6, 2015 M.K.BENDER HUGHES -To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Paul Canizares Paul. Canizatres@bakerhughes.corn Please find enclosed the directional survey data for the following well(s): 01-15B ABM W-26A Ll Enclosed for each well(s): 2 hardcopy prints of LWD data (MD and TVDss) 1 compact disk containing electronic data files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: OVS2-J , State of Alaska AOGCC DATE: WELL LOG TRANSMITTAL I�' DATA LOGGED il9rto,5 ,iAN ) 3 !U `l PROACTIVE DIAGNOSTIC SERVICES, INC. M.K.BENDER AOG GC • To: AOGCC Makana Bender 333 W. 7th Ave Suite 100 Anchorage,Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and/or Tubing Inspection(Caliper/ MIT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Merion Kendall LR2 - 1 900 Benson Blvd. Anchorage,AK 99508 and ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage,AK 9951B Fax: (907) 245-8952 200- k4o 25251 1) LeakPointTm Survey 27-Nov-14 Y-32 L1 BL/ CD 50-029-22149-60 2) LeakPointTM Survey 03-Dec-14 G-15C BL/ CD 50-029-20647-03 2.12A-V2o 7-25o Signed : 1/) .,417-a-tig1/41/..) .. Date : �e:ke�v Print Name: PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAx: (907)245-8952 E-MAIL: PDSANCHORAGE(f MEMORYLOG.COM WEBSITE:WWW.MEMORYLOG.COM D\Archil es\MasterTemplateFiles\Templates\Distribution\TransmittalSheets\BP_Transmit docx \z_co Hunt, Jennifer L (DOA) From: Lastufka,Joseph N <Joseph.Lastufka@bp.com> Sent Friday,January 02, 2015 11:04 AM To: Hunt,Jennifer L(DOA) Cc: Ramos,Tania (UOSS) Subject: (PBU G-15C/PTD#214-126 Categories: Attention Hi Jennifer, Please reference the following well. Well Name: PBU G-15C Permit#: 214-126 API #: 50-029-20647-03-00 Date of Test: 12/23/14 Type of Test: IPT (Initial Production Test) Choke Size: 95 Choke Unit: Deg Production Method: Flowing Duration (Hours Tested): 8 Top Reference (Top Perf MD): 11258' Bottom Reference (Bottom Perf MD): 11848' Tubing Flowing (Pressure): 250 Casing Pressure: 425 Total Test(Rate f/0, W, G): 404/9/3554 24-Hour Rate (0, W, G): 1211 /28/ 10662 Gravity (Oil, API): 33.4 Deg GOR (Gas-Oil Ratio): 8803 This well began Production on: 12/22/2014 Method of Operations on this date: Flowing 1 RBDMS4JAN - 5 2015 RECEIVED STATE OF ALASKA NOV 19 2014 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOGoGcc 1a. Well Status: . ®Oil 0 Gas LI SPLUG 0 Other ❑Abandoned 0 Suspended lb. Well Class 2OAAC 25.105 2OAAC 25110 0 Exploratory 0 Stratigraphic 0 GINJ ❑WINJ 0 WAG 0 WDSPL 0 Other No. of Completions One ® Development ❑Service 2. Operator Name: 5. Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 10/20/2014 214-126 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612, Anchorage,Alaska 99519-6612 10/11/2014 50-029-20647-03-00 4a. Location of Well(Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: 10/15/2014 PBU G-15C 3304' FNL, 3004' FEL, Sec. 12, T11N, R13E, UM Top of Productive Horizon: 8. KB(ft above MSL): 75.63' 15. Field/Pool(s) 3993' FNL, 1225' FEL, Sec. 11, T11N, R13E, UM GL(ft above MSL): 40.29' Prudhoe Bay/Prudhoe Bay Total Depth: 9. Plug Back Depth(MD+TVD) 4192' FNL, 291' FWL, Sec. 12,T11N, R13E, UM 11849' 9036' 4b. Location of Well(State Base Plane Coordinates, NAD 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 657239 y- 5968324 Zone- ASP4 11889' 9036' ADL 028280 TPI: x- 653753 y- 5967562 Zone- ASP4 11. SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 655273 y- 5967394 Zone- ASP4 None 18. Directional Surve Y ®Yes ❑ No 19.Water depth, if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD/GR/RES, GR/CCL/RPM 9811' 8768' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE I TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20'x 30" Insulated ,Conductor_ 38' 118' 38'_ 118' 36" 8 cu yds Concrete 13-3/8" 72# L-80 37' 2672' 37' 2672' 17-1/2" 3490 cu ft Permafrost II 9-5/8" 47# L-80 34' 9396' 34' 8397' 12-1/4" 1279 cu ft Permafrost, 130 cu ft Permafrost'C' 7" 26# L-80 8900' 9528' 7935' 8522' 8-1/2" 432 cu ft Class'G' 3-1/2"x3-3-16" 9.2#/6.2# 1 L-80 8873' 9811' 7910' 8768' 4-1/4" 230 cu ft Class'G' 2-3/8" 4.7# L-80 9313' 11888' 8318' 9036' _ 3-1/4" 52 sx Class'G' 24. Open to production or injection? ®Yes 0 No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET PACKER SET(MD/TVD) of Top&Bottom; Perforation Size and Number): (MD) 1.56" Gun Diameter,6 spf 5-1/2", 17#x 4-1/2", 12.6#, L-80 8963' 8833'/7874' eaNFLEM ; 26. ACID, FRACTURE,CEMENT SQUEEZE, ETC. 11258'-11423' 9032'-9034' WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑ Yes ® No 11623'-11848' 9035'-9036' O �� tE ., DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED -- �'_. 2500' Freeze Protect w/58 Bbls Diesel 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ® No Sidewall Core(s)Acquired? ❑Yes ® No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each), and summarize lithology and presence of oil,gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None ABE MS NOV 2 1. 2014 Form 10-407 Revised 10/2012 CONTINUED ON R VERSE �. Submit Original Only 29 GEOLOGIC MARKERS(List all formations and 4cers encounter 30. FORMATION TESTS NAME TVD Well Tested? es ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. 23SB-Zone 2B 9891' 8829' None 22TS 9956' 8872' 21TS-Zone 2A 10059' 8933' Zone 1 B 10267' 9009' Formation at Total Depth: Zone 1B 10267' 9009' 31.List of Attachment. Summary of Daily Drilling Reports,Summary of Post-Rig Work,Well Schematic Diagram, Surveys,Cement Report 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: J. Kyle Raese,564-4629 Email: John.Raese@bp.com Printed Name: Joe LastufkaTitle: Drilling Technologist � , h /101/14- Signature: Phone 564-4091 Date. 11 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b. TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13. The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28 Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation. Flowing,Gas Lift, Rod Pump, Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only TREE= s 6-3/8"CEW SAFETY NOT- 'ELL ANGLE>70°@ 10176'""MAX DOGLEG: WELLHEAD= MCEV OY G-15 C 34°@ 10545 V IOUSWELLBORES NOT SHOWN"— ACTUATOR= OTIS B-BO'.: OKB.B_EV= 75.63' I II BF.B..EV= 41.79' © 2050' —5-112"OTIS SSSVN,ID=4.562" KOP= 3100' MMz Angle= 970 @10545' GAS LIFT MANDRELS Datum MD= 9962' ST MD T VD DEV TYPE VLV LATCH PORT DATE Datum TVD= 8800'SS 12 2936 2935 6 CAM DMY RK 0 07/06/14 11 5108 4810 39 CAM LIMY RK 0 01/04/08 —CONDUCTOR,—#, ,D " ? 1 14 6320 5758 39 CRM DMY RK 0 07/06/14 9.5/8"DV PKR H 2621' 9 6471 5875 39 CAM DM' RK 0 04/06/07 8 7140 6408 36 CAM LIMY RK 0 12/05/98 13 318"CSG,72#,L-80,D=12.347' H 2672' 7 7284 6525 35 CAM DMY RK 0 12/05/98 6 7689 6863 32 CAM DMY RK 0 12/11/01 5 7839 6991 32 CAM DMY RK 0 12/05/98 Minimum ID = 1.78" @ 9324' 4 8235 7334 28 CAM OM1' RK 0 12/05/98 WIPER PLUG BUSHING IN DEPLOY SLV 3 8370 7455 26 CAM DMY RK 0 12/05/98 2 8518 7588 26 CAM DMY RK 0 12/05/98 1 8668 7724 25 CAM DM' RK 0 12/11/01 m 8738' -15-1/2"BKR L SLD SLV,ID=4.562" 5-1/2"TBG,17#,L-80,.0232 bpf,D=4.892" H 8803' 8803' H BOT PBR TBG SEAL ASSY lit 8813' {9-5/8"X 5-1/2"BOT 3-H PKR,D=4.75" 224 Ilti ? H5-1/2"X 4-1/2"XO,D=3.958' 8873' 3.70'BTT DEFLOY SLV w/4"GS PROF,ID=3.00" IWIPER PLUG BU.SHNG @ 8883'MLLED TO 2.30'(9/1/14) i �"'� 8889' --I4-1/2"OTIS X NP,D=3.813"(BEHIND PIPE/ "--I 8892' —H 3-1/2"HES X NP,D=2.813" D TOP OF 7"LNR H 8900' — 8932' -14-1/2"OTIS XN NP,MLLEDTO 3.80" 4-1/7 TBG,12.6#,L-80,.0152 bpf,13=3.958" H 8973' i 8973' {4-1/2"WLEG,D=3.958" BEHIND 9-5/8"CSG,47#,L-80,D=8.681" 9396' IS.% .4.-1 8964' H amp TT LOG?? PIPE 4. 3-1/2"LM,9.2#,L-80 SR, H 9446' .0087 bpf,ND=2.992' 4. . y4 9313' 12.70'DEPLOY SLV,13=2.25' WHPSTOCK H 9524' w' WIPE PLUG BUSHING @—9324',ID=1.78" 7"LNR,26#,L-80,.0383 bpf,ID=6.276" 9524' 9446' —3-112"X 3-3116'XO,13=2.786"(8131INL)t'It'F 3-3/16"WHIPSTOCK(09/15/14) H 9811' 7"LNR MLLOUT 1/1/MJOW (G-158)9528'-9536' 3-3/16'LNR,62#,L-80 TCII,.0076 bpf,D=2.80" H —9815' , ESTIMATED TOP OF CEMENT(10/17/14) H —10130 MLLOUT WINDOW (G-15C)9811'-9816' PE RFORATEON SUNf.AARY 1094$' —12-3/8"PUP JOM w l RA PP TAG REF LOG:BAKER RPM ON 10/18/14 ANGLE AT TOP P132F:90°@ 11258' 11322' H2-3/8"PUP JOINT w/RA PP TAG Note:Refer to Production(B for historical pert data r r SIZE SPF INTERVAL Opn/Sqz SHOT SQZ r 1.56" 6 11258-11423 0 10/19/14 1.56" 6 11623-11848 0 10/19/14 k, a El � - t 2-3/8"LNR 4.7#,L-80 TH1 -511, 0039 bpf, D=1.995' H{ 11888' k11849' -{ REIT() DATE REV BY COMMENTS DATE REV BY C)PFWSITS PRUDHOE BAY UNIT 11/30181 VAN 3 ORIGINAL COMPLETION 11/10/14 TR/JMD COI2RECTH)TBG DEPTHS WELL: G-15C 08/08/98 1OROIC' CTD SIDETRACK(G-15A) PE RNTT No:"2141260 05/31/08 NORDIC 1 CTD SIDETRACK(G-15B) AR No: 50-029-20647-03 10/21114 NORDIC 1 CTD SIDETRACK(G-15C) SEC 12,T11 N,R13E,1976'FSL&2276'FWL 10/21/14 PJC DRUG HO CORRECTIONS 10/30/14 KJR/PJC FINAL ODE APPROVAL BP Exploration(Alaska) North America-ALASKA-BP Page 1 of 17 Operation Summary Report Common Well Name:G-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/8/2014 End Date 10/16/2014 X3-015RH-C:(3,904,016.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:10/15/1981 12:00:00AM Rig Release:10/20/2014 Rig Contractor.NORDIC CALISTA UWI:500292064700 Active datum:G-15©75.63usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) 10/8/2014 21:00 - 22:00 1.00 RIGD P PRE RIG DOWN AND PREP FOR MOVING OFF WELL. 22:00 - 23:00 1.00 MOB P PRE MOVE OFF OF WELL G-01 AND STAGE RIG ON PAD.FILL OUT PERMITS FOR PIT WORK AND HOLD PRE JOB SAFETY MEETINGS FOR TASK. 23:00 - 00:00 1.00 MOB P PRE MOVE RIG TO G-PAD SOUTH.LINE UP RIG TO WELLAND MOVE RIG TO EDGE OF PAD. SHUT DOWN TO COMPLETE PIT WORK ON RIG. 10/9/2014 00:00 - 01:00 1.00 MOB N RREP PRE WELD PATCHES ON HOLES IN PIT#1.PIT HAD 12 HOLES,FIXED WITH 6 PATCHES. 01:00 - 03:00 2.00 MOB P PRE FINISH PREPPING PAD. RIG DOWN DRILL SITE MAINTENANCE FROM BLEEDING IA. SHUT IN IA VALVES,VERIFY ALL VALVES ARE SHUT. BACK RIG OVER WELLAND SET DOWN. RIG ACCEPT AT 03:00 HOURS. 03:00 - 03:30 0.50 RIGU P PRE PERFORM LEAK TIGHT TEST FOR SWAB CAP REMOVAL. REMOVE SWAB CAP. 03:30 - 05:30 2.00 RIGU P PRE NIPPLE UP BOP.RIG UP. HOLD RIG EVACUATION DRILL. CONDUCT AAR FOR RIG EVAC DRILL. _ SO SIGNIFICANT FINDINGS FROM DRILL. 05:30 - 09:30 4.00 RIGU N HMAN PRE RISER ON BOP'S IS TOO LONG FOR TREE HEIGHT,SWAP OUT RISER 09:30 - 10:00 0.50 RIGU P PRE GREASE MUD CROSS&CHOKE VALVES 10:00 - 11:00 1.00 BOPSUR P PRE PRESSURE UP KOOMEY UNIT TO CYCLE THE HCR VALVE WHILE GREASING 11:00 - 12:00 1.00 BOPSUR P PRE FLUID PACK TO START TESTING BOPE 12:00 - 14:40 2.67 BOPSUR P PRE SHELL TEST 12:40 GOOD SHELL TEST,START TESTING BOPE -PJSM,POST AND CHECK ALL BOPE DIAGRAMS AND MEASUREMENTS AND FLUID PACK ALL LINES. -PRESSURE TEST BOPE PER BP,NORDIC AND AOGCC TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES. ""AOGCC LOU GRIMALDI WAIVED WITNESS OF TEST•'•' -TEST ALL AU DIBLENISUAL ALARMS. FILL PITS WITH USED DRILLING MUD 14:40 - 17:20 2.67 BOPSUR P PRE REPAIRS TO CENTRIFUGE TROUGH IS STILL LEAKING FLUID FROM PIT 1 OUT TO THE • CUTTINGS BOX CALL VAC TRUCK BACK TO SUCK PITS OUT CALL SUPERINTENDENT&WTL TO DISCUSS REPAIRS AND ASKING FOR PERMISSION TO GETA L2RA STARTED FOR THE WORK CALLED DRILLING HSE ADVISOR TO COME OUT TO THE RIG FOR THE L2RA _ Printed 10/28/2014 9:58:38AM North America-ALASKA-BP Page 2 of 17 Operation Summary Report Common Well Name:G-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/8/2014 End Date:10/16/2014 X3-015RH-C:(3,904,016.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:10/15/1981 12:00:00AM Rig Release:10/20/2014 Rig Contractor:NORDIC CALISTA UW:500292064700 Active datum:G-15 @75.63usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:20 - 17:45 0.42 BOPSUR P PRE PERFORM RIG EVAC DRILL WITH DAY CREW 17:45 - 19:00 1.25 BOPSUR P PRE •FINISH BOP STACK TESTING AND DRAW DOWN OF ACCUMULATOR. WELL STILL HAS TWC INSTALLED. INSTALL NIGHT CAP AND TEST TO 250 PSI • LOW,3500 PSI HIGH FOR 5 CHARTED MINUTES EACH. 19:00 - 22:00 3.00 RIGU N RREP PRE RECEIVE FINAL APPROVAL FROM JIM • WILLINGHAM OF L2RA. • VERIFY PERMIT TO WORK,LO/TO,CONFINED SPACE ENTRY AND HOT WORK PERMITS ARE PROPERLY FILLED OUT AND READY TO GO. • SUCK REMAINDER OF FLUID FROM CUTTINGS BOX. MOVE CUTTINGS BOX AWAY FROM RIG. MOVE VAC TRUCKS TO OFF DRILLERS SIDE •OF PAD. WRAP CENTRIFUGE CHUTE WITH FIRE BLANKETS TO PREVENT SPARKS OR SLAG • FROM EXITING RIG. PREP PITS FOR WELDING BY ONE LAST FRESH WATER RINSE,WIPE ANY RESIDUAL HYDROCARBON OFF PIT WALLS AND •FLOORS. SPOT FIRE WATCH IN PITS AND OUTSIDE PITS AND OUTSIDE BY CENTRIFUGE CHUTE. WELDER USED WELDING SHOP TO PREP • METAL FOR WELDING AND CUT APPROPRIATE PLATING TO COVER PROBLEM AREAS. COMPLETE WELDING UP CHUTE. • 22:00 - 00:00 2.00 RIGU • N RREP PRE MOVE CUTTINGS BOX BACK UNDER RIG CENTRIFUGE CHUTE. CLEAN UP PITS FROM WELDING OPERATION. BACK UP KCL WATER TRUCK AND TAKE ON FLUID TO TEST CHUTE. FILL PIT#1 UP,CHUTE LEAKING. OFFLOAD PIT TO VAC TRUCK WELDER HAS HOURED OUT AND NO OTHER WELDER AVAILABLE UNTIL CHANGE OUT TIME IN THE MORNING.RIG WELDER WILL COME OUT TO FINISH PROJECT AT CHANGE OUT. CLOSE OUT PERMITS AND NOTIFY RESCUE TEAM OF CLOSE OUT. 10/10/2014 00:00 - 01:00 1.00 BOPSUR P PRE HOLD PRE JOB SAFETY MEETING. POP OFF NIGHT CAP. PREP FOR TESTING BOP. 01:00 - 04:00 3.00 BOPSUR P PRE MAKE UP NOZZLE,STAB ON INJECTOR,RUN IN HOLE. TEST 2"COMBI MANUAL LOCK DOWNS FOR INITIAL BOP TEST. • PULL UP AND TEST BLIND RAM MANUAL LOCK DOWNS FOR INITIAL BOP TEST. PULL NOZZLE,MAKE UP 2-3/8"PUMP,RUN IN HOLE. TEST 2-3/8"COMBI MANUAL LOCK DOWNS FOR INITIAL BOP TEST. 04:00 - 05:00 1.00 BOPSUR P PRE TEST INNER REEL VALVE AND PACKOFF. Printed 10/28/2014 9:58:38AM North America-ALASKA-BP Page 3 of 17 Operation Summary Report Common Well Name:G-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/8/2014 End Date:10/16/2014 X3-015RH-C:(3,904,016.00) Project:Prudhoe Bay Site:PBG Pad Rig Name/No.:NORDIC 1 Spud Date/Time:10/15/1981 12:00:00AM Rig Release:10/20/2014 Rig Contractor:NORDIC CALISTA UWI:500292064700 Active datum:G-15©75.63usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 05:00 - 06:00 1.00 f BOPSUR P PRE PUMP SLACK BACK SHUT DOWN. POP OF INJECTOR,RIG UP COIL CUTTER. CUT 310'OF COIL TO FIND WIRE. RIG DOWN COIL CUTTER. 06:00 - 06:25 0.42 BOPSUR P PRE CREW CHANGE 06:25 - 06:30 0.08 BOPSUR P PRE !HOLD PJSM TO MU THE CTC AND BHI UQC AND THE WELDER PREPPING TO CONTINUE WORKING ON THE CENTRIFUGE DUMP CHUTE REPAIR.SECURE THE WELL&FILL OUT ALL PERMITS BEFORE ALLOWING THE •WELDER TO CONTINUE HIS WORK RESCUE TEAM ON STBY FOR NORDIC 1 CONFINED SPACE ENTRY IF NEEDED 06:30 - 09:00 2.50 BOPSUR P PRE MU NIGHT CAP AND TEST GOOD TEST ON NIGHT CAP BLOW BACK COIL WITH AIR HEAD UP CTC&UQC AND TEST ALL PERMITS FILLED OUT SNIFF TEST SHOWING 0%LEL&0 PPM FOR H2S AND 20.8%FOR OXYGEN 09:00 - 09:15 0.25 BOPSUR N RREP PRE j USE BED TRUCK TO MOVE THE CUTTINGS BOX AWAY FROM THE RIG FIRE WATCH IN THE PITS AND OUTSIDE WHERE THE CHUTE COMES OUT OF THE RIG ALLOW WELDER TO MAKE REPAIRS 09:15 - 09:45 0.50 BOPSUR N RREP PRE WELDER IS DONE !REMOVE FIRE BLANKET FROM CHUTE OUTSIDE AND MONITOR INSIDE AND OUTSIDE FOR 30 MINUTES 09:45 - 10:00 0.25 BOPSUR N RREP PRE MONITORED FOR 30 MIN SINCE LAST SPARK, ALL IS GOOD WELDER IS DRAWING ATEMPLATE OF THE 'CHUTE INCASE IT NEEDS TO BE REPLACED 10:00 - 10:30 0.50 BOPSUR N RREP PRE SPOT CUTTINGS BOX AND PREP TO FILL PIT #1 TO CHECK FOR LEAKS VALVE&GREASE CREW ON LOCATION TO CHECK TREE BOLTS AND PULL TWC IF THE LEAK IS FIXED 10:30 - 11:00 0.50 BOPSUR P PRE PU THE INJECTOR AND STAB ON THE WELL SO THE GREASE CREW CAN CHECK THE TREE BOLTS HOLD PJSM WITH GREASE CREW TO CHECK TREE BOLTS FILL PIT 1 TO CHECK CHUTE FOR LEAKS 11:00 - 11:45 0.75 BOPSUR P PRE !GREASE CREW CHECKING TREE BOLTS CENTRIFUGE CHUTE IS DRY,NO LEAKS SUCK OUT PIT 1 11:45 - 12:00 0.25 BOPSUR P PRE ALL TREE BOLTS WERE TIGHT I HOLD PJSM TO REMOVE THE INJECTOR AND LEAVE THE 7"OTIS X-O ON THE STACK TO RU THE VALVE CREW LUBRICATOR,LOAD THE !LUBRICATOR ON THE RIG AND RU TO PULL i THE TWC 12:00 - 12:35 0.58 BOPSUR P PRE PU THE INJECTOR AND SET OFF TO THE SIDE CALL OUT BTT TO BRING MILLING BHA TO THE RIG LOAD THE VC LUBRICATOR ON THE RIG TO PULL THE TWC RU PULLING TOOLS TO PULL TWC Printed 10/28/2014 9:58:38AM North America-ALASKA-BP Page 4 of 17 Operation Summary Report Common Well Name:G-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/8/2014 End Date. 10/16/2014 X3-015RH-C:(3,904,016.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:10/15/1981 12:00:00AM Rig Release:10/20/2014 Rig Contractor:NORDIC CALISTA UWI:500292064700 Active datum:G-15 @75.63usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:35 - 12:50 0.25 BOPSUR P PRE CLOSE THE CHOKE AND PT THE LUBRICATOR 12:50 - 13:30 0.67 BOPSUR P PRE GOOD PT,CLOSE THE CHOKE,OPEN THE SWAB,SSV&MASTER TO PULL THE TWC 13:30 - 14:00 0.50 BOPSUR P - PRE TWC PULLED AND ALL SEALS INTACT LOAD OUT LUBRICATOR&PULLING TOOLS 14:00 - 14:10 0.17 BOPSUR P PRE HOLD PJSM TO PU THE INJECTOR AND TEST THE CTC&UQC,THEN STAB ON TO THE QTS AND TEST THE 7"CONNECTION,THEN PUMP 1 CIRCULATION FORWARD AT 1.5 BPM TO PUMP SLACK FORWARD 14:10 - 14:30 0.33 BOPSUR P PRE PT THE CTC&UQC 14:30 - 15:20 0.83 BOPSUR P PRE GOOD PT,STAB ON AND PUMP 1 CIRCULATION FORWARD 15.20 - 15:35 0.25 BOPSUR P PRE PT THE LUBRICATOR CONNECTION 15:35 - 15:50 0.25 BOPSUR P PRE GOOD PT,BLOW DOWN STACK TO GET RID OF THE WATER,RU TO PUMP METHANOL ACROSS THE TOP THEN OPEN THE WELL TO - A CLOSED CHOKE 15:50 - 16:05 0.25 BOPSUR P PRE MASTER&SWAB VALVES OPEN,NO PRESSURE,WELL IS ON A VAC CRACK OPEN THE CHOKE 1/3 • LINE UP TO FILL THE HOLE WITH METHANOL • WELL TOOK 11 BBLS TO FILL,SHUT DOWN PUMP FOR A COUPLE MINUTES THEN PUMP AGAIN TO ENSURE THE HOLE IS FULL 16:05 - 16:35 0.50 BOPSUR P PRE HOLE IS FULL START 30 MIN FLOW CHECK AS PER WELL PLAN 16:35 - 17:50 1.25 STWHIP P WEXIT GOOD NO FLOW,FILL THE HOLE,HOLE IS FULL HOLD A PJSM TO PU THE INJECTOR AND MU THE WINDOW MILLING BHA MILLS GAUGE 2.75 GO-2.74 NO GO STAB ON WELLAND PT THE QTS 17:50 - 18:15 0.42 STWHIP P WEXIT GOOD TEST,RIH WITH WINDOW MILLING BHA FOLLOWING THE APPROVED INITIAL ENTRY PROCEDURE TAKING ALL RETURNS THROUGH THE CHOKE HOLDING 100 PSI 18:15 - 20:00 1.75 STWHIP P WEXIT GETTING GAS CUT FLUID BACK AT 1250' GOOD RETURNS AT 1800' CONTINUE RUNNING TO 5,336'MD WITH NO ISSUES. RUN AT 97 FPM WITH 12K DOWN WEIGHT. PUMP AT 1.4 BPM WITH 975 PSI. RUN IN TO TIE-IN DEPTH OF 8,480'MD. 20:00 - 21:30 1.50 STWHIP P WEXIT 1 LOG DOWN FROM 8,480'MD TO 9,634'MD. RUN AT 2 FPM WITH 22K DOWN WEIGHT. PUMP AT 1.5 BPM WITH 1160 PSI. LOG CORRECTION OF MINUS 9'. '21:30 - 22:00 0.50 STWHIP P WEXIT RUN IN HOLE AT 19 FPM WITH 22K DOWN WEIGHT. LIGHTLY TAG UP ON WHIPSTOCK AT 9,812', PU GO DOWN AND VERIFY. PULL UP TO 9,800'MD. 22:00 - 23:00 1.00 STWHIP P WEXIT CIRCULATE BOTTOMS UP AT 3 BPM WITH 3880 PSI. NO GAS OR GAS CUT FLUID TO SURFACE. 23:00 - 23:30 0.50 STWHIP P WEXIT 'OFFLOAD FLUID FROM TIGER TANK TO VAC TRUCK IN PREPARATION FOR DISPLACING WELLBORE TO MILLING FLUID. Printed 10/28/2014 9:58:38AM North America-ALASKA-BP Page 5 of 17 Operation Summary Report Common Well Name:G-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/8/2014 End Date:10/16/2014 X3-015RH-C:(3,904,016.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:10/15/1981 12:00:00AM Rig Release:10/20/2014 Rig Contractor:NORDIC CALISTA UWI:500292064700 Active datum:G-15 @75.63usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:30 - 00:00 0.50 STWHIP P WEXIT DISPLACE WELL FROM KCL WATER TO 9.5 PPG POWER PRO. I PUMP AT 2.8 BPM WITH 3600 PSI. 10/11/2014 00:00 - 01:00 1.00 STWHIP P WEXIT DISPLACE WELLBORE FROM KCL WATER TO 9.5 PPG POWERPRO MILLING FLUID. PUMP AT 2.5 BPM WITH 3960 PSI. MUD WEIGHT IN 9.5 PPG,OUT 8.4 PPG. AT 212 BBLS WEIGHT COMING UP ON OUT MICRO MOTION. TAKE RETURNS INTO PITS AT 222 BBLS,10 BBL INTERFACE. 01:00 - 01:15 0.25 STWHIP P WEXIT 'GOOD CLEAN MUD AROUND. SHUT DOWN CLOSE EDC. TAKE SLOW PUMP RATES. 01:15 - 02:30 1.25 STWHIP P WEXIT WITH CLOSED EDC RUN IN AND TAG UP ON TOP OF WHIPSTOCK AT 9,810. PUMP AT 1.5 BPM WITH 2886 TO 2930 PSI. • FREE SPIN 2886 PSI. VOLUME 293 BBLS,IA-200 PSI,OA-120 PSI. NOT SEEING ANY WEIGHT ON BIT AT 9,811' MD AND NO INDICATION OF ANY SIGNIFICANT MOTOR WORK. DOWN WEIGHT 20K. SEE MOTOR WORK AT 9,811.7',WOB 0.53K, PUMP PRESSURE 3090 PSI. TOP OF WINDOW IS 9,811.7'. BEGIN MILLING OPERATIONS. 02:30 - 03:45 1.25 STWHIP P WEXIT MILLING AT 9,812'MD AT 1.5 BPM WITH 3010 PSI WITH 124 PSI MOTOR WORK. WOB AT 0.5 TO 0.85K. TIME MILLING AT 1 FPH. PAINT FLAG. SEEING MOTOR WORK BETWEEN 100 AND 300 PSI. WEIGHT ON BIT AT 0.7 TO 2.0K. MILLING OFF NICELY BUT TAKING SLIGHTLY LONGER THAN ANTICIPATED WHILE TRYING TO KEEP WEIGHT ON BIT UNDER 2.2K. MILL TO 9,812.8'FOR FIRST FOOT MILLED. NO STALLS OR ISSUES. 03:45 - 05:00 1.25 STWHIP P WEXIT MILL AHEAD USING MORE WEIGHT ON BIT AS NEEDED BUT KEEPING WEIGHT UNDER 2.2K. PUMP AT 1.5 BPM WITH 3100 TO 3200 PSI. CONTINUE TO MILL AHEAD.MILLING OFF SLOWLY AT TIMES BUT STEADILY. NO STALLS OR ISSUES. 05:00 - 06:00 1.00 STWHIP P WEXIT MILLING AHEAD FROM 9,813.5'MD. PUMPING AT 1.5 BPM WITH 3080 PSI, MOTORWORK 200 PSI. WOB 1.8K,MILLING AT 1 TENTH PER 6 MINUTES. NICE STEADY RATE. 06:00 - 08:10 2.17 STWHIP P WEXIT CONTINUE MILLING WINDOW AT 9814.4' ROP=0.1'EVERY 6 MIN MIN WOB=1.3K 1.5 BPM 3020 PSI 08:10 - 08:40 0.50 STWHIP P WEXIT CONTINUE MILLING WINDOW AT 9816.4' ROP=0.1'EVERY 6 MIN WOB=1.53K FREE SPIN=2800 PSI AT 1.5 BPM CIRC PSI= 3020 PSI Printed 10/28/2014 9:58:38AM North America-ALASKA-BP Page 6 of 17 Operation Summary Report Common Well Name:G-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/8/2014 End Date:10/16/2014 X3-015RH-C:(3,904,016.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:10/15/1981 12:00:00AM Rig Release:10/20/2014 Rig Contractor:NORDIC CALISTA ,UWI:500292064700 Active datum:G-15©75.63usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:40 - 09:40 1.00 STWHIP P WEXIT LOOKS LIKE WE EXITED THE BOTTOM OF ;THE WINDOW ON DEPTH 9816.9' MILL 1'AT SAME SPEED TO DRESS THE BOTTOM OF THE WINDOW WITH THE STRING MILL THEN DRILL 10'OF RAT HOLE 09:40 - 11:50 2.17 STWHIP P WEXIT DRILL 10'OF RAT HOLE 11:50 - 13:10 1.33 STWHIP P WEXIT • START REAMING PASSES TO DRESS THE WINDOW 13:10 - 13:15 0.08 STWHIP P WEXIT START 20 BBL HIGH VIS PILL 13:15 - 13:20 0.08 STWHIP P WEXIT REAM PASSES ARE CLEAN,SHUT DOWN THE PUMP AND DRY DRIFT IN BOTH DIRECTIONS 13:20 - 13:30 0.17 STWHIP P WEXIT DRY DRIFTS ARE CLEAN,STOP ABOVE THE WS,OPEN THE EDC AND FLOW CHECK THE WELL 13:30 - 15:30 2.00 STWHIP P WEXIT GOOD NO FLOW,PUH SLOW WAITING FOR • HIGH VIS PILL THEN POOH CHASING IT BOTTOMS UP SAMPLE HAS GOOD FORMATION HIGH VIS PILL AT SURFACE,COULD NOT TELL IF IT BROUGHT UP ANYTHING BECAUSE 98% OF IT RAN OFF THE END OF THE SHAKER 15:30 - 15:45 0.25 STWHIP P WEXIT HOLD PJSM TO PULL THE WINDOW MILLING I BHAAND GAUGE MILLS 15:45 - 16:30 0.75 STWHIP.- P WEXIT GOOD NO FLOW,TAG UP,REMOVE THE INJECTOR,LD THE BHAAND GAUGE THE MILLS 16:30 - 17:25 0.92 STWHIP P WEXIT BHA OOH MILLS GAUGED 2.74 GO,2.73 NO GO •MU THE BUILD BHA MU THE INJECTOR TO THE BHA&STAB ON PT THE QTS-PASS 17:25 - 19:00 1.58 STWHIP P WEXIT RUN IN HOLE AT 95 FPM WITH 14K DOWN WEIGHT. PUMP AT 0.75 BPM WITH 1270 PSI. MUD WEIGHT IN AND OUT 9.5 PPG. 19:00 - 20:00 1.00 • STWHIP P WEXIT LOG TIE-IN FROM 9,466'MD TO 9,488'MD LOG AT 1.6 FPM WITH 18K DOWN WEIGHT. PUMP AT 0.75 BPM WITH 1260 PSI. LOG MINUS 9 FOOT CORRECTION. CLOSE EDC. RUN IN TO BOTTOM AND TAKE SLOW PUMP RATES. 20:00 - 22:00 2.00 DRILL P PROD1 RUN IN HOLE THROUGH WINDOW-NO PROBLEMS. DIRECTIONAL DRILL AHEAD FROM 9,828'MD. PUMP AT 1.65 BPM WITH 3425 TO 3500 PSI, FREE SPIN 3170 PSI. I DOWN WEIGHT 18K,WOB 0.77 TO 1.5K. DRILL AHEAD TO 9,877'MD,LOOSE 1 CIRCULATION AT 100%. OVER 15 MINUTES GAIN BACK TO 25% LOSSES OR 20 BPH. LINE UPA LOAD OF MUD,CONTACT • SUPERINTENDENT. OK TO PROCEED UNDER PRESENT CONDITIONS-DRILL AHEAD. Printed 10/28/2014 9:58:38AM North America-ALASKA-BP Page 7 of 17 Operation Summary Report Common Well Name:G-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/8/2014 I End Date:10/16/2014 X3-015RH-C:(3,904,016.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud DateTme:10/15/1981 12:00:00AM Rig Release:10/20/2014 Rig Contractor:NORDIC CALISTA i UWI:500292064700 Active datum:G-15 @75.63usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) 22:00 - 23:00 1.00 DRILL P PROD1 FORMATION REACTING AS THOUGH WE ARE IN TRANSITION. STICKY OFF BOTTOM AND ROP HAS SLOWED WAY DOWN. ALSO THE VIBRATION HAS INCREASE SIGNIFICANTLY. DRILL SLOWLY TO GET THROUGH THIS ZONE WITHOUT TRASHING THE BIT. RATE DOWN TO 11 FPH,INC AT BIT 43°. LOSSES AT 20:25 ARE DOWN TO 5 BPH. PUMP AT 1.7 BPH WITH 3300 PSI. UP WEIGHT 38K,DOWN WEIGHT 19K,WOB 0.6K,ECD 10.13 PPG,MUD WEIGHT IN AND OUT 9.5 PPG. 23:00 - 00:00 1.00 DRILL P ' PROD1 DRILL AHEAD TO 9,899'MD. LOSSES HEALED UP AT 9,894'MD. PUMPING AT 1.65 BPM,3190 PSI. DOWN WEIGHT 20K,WOB 0.43. MUD WEIGHT 9.5 PPG,ECD 10.12 PPG. I NEAR BIT INC 43.95°. STILL SEEING ABNORMAL VIBRATION • PERIODICALLY. SLOW DRILLING BUT TRYING TO FEATHER THROUGH THIS SECTION SO AS NOT TO TRASH THE BIT. ' RESISTIVITY SHOW WE DRILLED INTO A FRACTURE AND PYRITE AT 9,877'MD. 10/12/2014 00:00 - 02:00 2.00 DRILL P PROD1 DIRECTIONAL DRILL IN BUILD SECTION FROM 9,899'MD TO 9,929'MD,ROP AT 15 FPH. ,PUMPING AT 1.65,3270 PSI,FREE SPIN 3200 PSI. DOWN WEIGHT 20K,WOB.88K TO 1.3K. WORKING THROUGH SLOW DRILLING AFTER • FRACTURE AND PYRITE. NO LOSSES AT THIS TIME. ROP NOT IMPROVING,NO STALLS AND WEIGHT TRANSFER NOT AN ISSUE. ABLE TO STAY ON PLAN FOR BUILD. CHERT JUMPED FROM SLIGHTLY LESS THAN 50%TO 70%. _ 02:00 - 03:00 1.00 DRILL P PROD1 DRILL AHEAD TO 9,946'MD. SAW LOSSES TEMPORARILY INCREASE TO 7 BPH AT 9,933'MD THEN FALL OFF TO NO LOSSES. SLOW DRILLING IN 70%CHERT.REAL TIME ROP 15-20 FPH,AVERAGE 17. 03.00 - 04:00 1.00 DRILL P PROD1 DRILL TO 9,964'MD AT 18 FPH. DOWN WEIGHT 20K,WOB 0.8K. PUMPING AT 1.73 IN,1.73 OUT,8.5 PPG IN AND OUT,ECD 10.15 PPG. HIT GAMMA SPIKES AT 9,914'MD,8,793'TVD, NEAR BIT INC 50.5°,LOOKS LIKE 25N AND MATCHES PARENT WELL LOGS. THE 9,950'SAMPLE SHOWS CHERT HAS DECREASED TO 30%. 04:00 - 05:00 1.00 DRILL P PROD1 -DIRECTIONAL DRILL TO 9,982'MD AT 18 FPH WITH NO LOSSES. PUMP AT 1.73 BPM WITH 3435 PSI. DOWN WEIGHT 19.5K,WOB 0.4K-0.9K. MUD WEIGHT IN AND OUT 8.5 PPG,ECD 10.15 PPG. Printed 10/28/2014 9 58:38AM • North America-ALASKA-BP Page 8 of 17 Operation Summary Report Common Well Name:G-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/8/2014 End Date:10/16/2014 X3-015RH-C:(3,904,016.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:10/15/1981 12:00:00AM Rig Release:10/20/2014 Rig Contractor:NORDIC CALISTA UW:500292064700 Active datum:G-15 @75.63usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:00 - 06:45 1.75 DRILL P PROD1 DRILL AHEAD TO 10,026'MD AT ROP OF 29 FPH. DRILLING RATE AS IMPROVED TO 25 FPH. PUMP AT 1.74 BPM WITH 3490 PSI. DOWN WEIGHT 19K,WOB 0.6K. NEAR BIT INC 50.6T. 06:45 - 07:30 0.75 DRILL P PROD1 OBTAIN SPR'S THEN CONTINUE DRILLING 07:30 - 08:40 1.17 DRILL P PROD1 CONTINUE DRILLING AHEAD FREE SPIN=3204 PSI AT 1.79 BPM RATE IN=1.76 BPM RATE OUT=1.78 BPM ROP=43 FPH WOB=1.36 K CIRC PSI= 3489 PSI MW IN=9.50 PPG MW OUT=9.48 PPG ECD =10.17 PPG IAP=483 PSI OAP=491 PSI PVT=295 BBLS 08:40 - 09:25 0.75 DRILL P PROD1 CONTINUE DRILLING AHEAD FREE SPIN=3204 PSI AT 1.79 BPM RATE IN=1.75 BPM RATE OUT=1.74 BPM ROP=61 FPH WOB=1.68K CIRC PSI= 3593 PSI MW IN=9.50 PPG MW OUT=9.48 PPG ECD =10.19 PPG 'IAP=486 PSI OAP=494 PSI PVT=294 BBLS 09:25 - 10:30 1.08 DRILL P PROD1 PU 100'TO CHECK PARAMETERS THEN CONTINUE DRILLING FREE SPIN=3204 PSI AT 1.79 BPM RATE IN=1.76 BPM RATE OUT=1.76 BPM ROP=75 FPH WOB=2.64 K CIRC PSI= 3677 PSI MW IN=9.50 PPG MW OUT=9.48 PPG ECD =10.20 PPG IAP=502 PSI OAP=503 PSI PVT=294 BBLS 10:30 - 11:15 0.75 DRILL P PROD1 CONTINUE DRILLING AHEAD 'FREE SPIN=3204 PSI AT 1.79 BPM RATE IN=1.75 BPM RATE OUT=1.74 BPM ROP=68 FPH WOB=1.65 K CIRC PSI= 3585 PSI MW IN=9.50 PPG MW OUT=9.49 PPG ECD =10.21 PPG IAP=532 PSI OAP=520 PSI PVT=294 BBLS 11:15 - 11:30 0.25 DRILL P PROD1 WIPE TO THE WINDOW AND LOG TIE IN 11:30 - 11:45 0.25 DRILL P PROD1 LOG TIE IN 11:45 12:00 0.25 DRILL P PROD1 CORRECT DEPTH+1'AND RIH TO CONTINUE DRILLING 12:00 - 14:35 2.58 DRILL P PROD1 CONTINUE DRILLING AHEAD FREE SPIN=3204 PSI AT 1.79 BPM RATE IN=1.75 BPM RATE OUT=1.74 BPM ROP=61 FPH WOB=2.01 K CIRC PSI= 3783 PSI MW IN=9.52 PPG MW OUT=9.50 PPG ECD =10.23 PPG IAP=532 PSI OAP=520 PSI PVT=294 BBLS Printed 10/28/2014 9:58:38AM North America-ALASKA-BP Page 9 of 17 Operation Summary Report Common Well Name:G-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/8/2014 End Date:10/16/2014 X3-015RH-C:(3,904,016.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:10/15/1981 12:00:00AM Rig Release:10/20/2014 Rig Contractor:NORDIC CALISTA UWI:500292064700 Active datum:G-15 @75.63usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:35 - 15:40 1.08 DRILL P PROD1 CONTINUE DRILLING AHEAD FREE SPIN=3204 PSI AT 1.79 BPM RATE IN=1.83 BPM RATE OUT=1.84 BPM ROP=58FPH WOB=1.67K CIRC PSI= 3761 PSI MW IN=9.52 PPG MW OUT=9.48 PPG ECD =10.24 PPG IAP=629 PSI OAP=598 PSI PVT=290 BBLS 15:40 - 17:40 2.00 DRILL P PROD1 PU AND CIRC ALL SAMPLES UP FOR THE GEO,MAKE A SLOW WIPER TO THE WINDOW PVT=289 BBLS 17:40 - 18:00 0.33 DRILL P PROD1 LAST SAMPLE IS SHOWING JUST ATRACE OF TAR.GEO WOULD LIKE TO DRILL AHEAD TO 10450 COLLECTING 10'SAMPLES THEN CIRCULATE THEM UP WHILE BUILDING A LITTLE ANGLE.GIVE DD A LITTLE TIME TO PLAN WHAT THE GEO WANTS 18:00 - 19:00 1.00 DRILL P PROD1 DD'S READY CONTINUE DRILLING AHEAD TO 10,450'MD. FREE SPIN=3350 PSI AT 1.77 BPM RATE IN=1.78 BPM RATE OUT=1.76 BPM ROP=50FPH WOB=1.98K CIRC PSI= 3647 PSI MW IN=9.53 PPG MW OUT=9.50 PPG ECD =10.24 PPG IAP=688 PSI OAP=679 PSI PVT=287 BBLS 19:00 - 21:45 2.75 DRILL P PROD1 CIRCULATE UP SAMPLES AT 1.75 BPM WITH 3380 PSI. PULL UP HOLE AT 2.5 FPM WITH 34K UP WEIGHT.PULL TO 10,200'MD. RUN BACK TO BOTTOM AT 13 FPM WITH 16K DOWN WEIGHT. TAKE SLOW PUMP RATES. CONTINUE TO CIRCULATE WHILE WAITING ON WORD FROM TOWN. IDENTIFIED HOT AT 10,410'MD,8,966'TVD. WILL INVERT TO 96°AND LAND AT 8,962 TVD. 21:45 - 23:00 1.25 DRILL P PROD1 DRILL AHEAD TO 10,518'MD AT 54 FPH ROP. PUMP AT 1.7 BPM WITH 3520 PSI,FREE SPIN 3360 PSI. DOWN WEIGHT 15K,WOB 1.5K-2.0K. MUD WEIGHT IN AND OUT 9.5 PPG,ECD 10.25 PPG. 23:00 - 00:00 1.00 DRILL P PROD1 DRILL AHEAD TO 10,557'MD AT 39 FPH ROP. PUMP AT 1.7 BPM WITH 3655 PSI,FREE SPIN 3360 PSI. DOWN WEIGHT 2K,WOB 1K-2.6K,UP WEIGHT 37K. MUD WEIGHT IN AND OUT 9.5 PPG,ECD 10.28 PPG. NEAR BIT INCLINATION 97.06°. Printed 10/28/2014 9:58:38AM North America-ALASKA-BP Page 10 of 17 Operation Summary Report Common Well Name:G-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/8/2014 End Date:10/16/2014 X3-015RH-C:(3,904,016.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:10/15/1981 12:00:00AM Rig Release:10/20/2014 Rig Contractor:NORDIC CALISTA UW1:500292064700 Active datum:G-15 @75.63usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10/13/2014 00:00 - 02:00 2.00 DRILL P PROD1 DIRECTIONAL DRILL TO 10,595'MD AT 19 FPH ROP. PUMP AT 1.7 BPM WITH 3560 PSI,FREE SPIN 3380 PSI. DOWN WEIGHT NEGATIVE 10 TOO WEIGHT WITH 0 TO 3K WOB. RAN INTO DIFFICULT DRILLING AT 10,560'MD. HAVING TO STACK WEIGHT AND WORK UP AND DOWN WITH SEVERAL SHORT WIPERS. BROKE THROUGH AT-10,575'MD,ABLE TO DRILL AHEAD WITH NEGATIVE 1K AND 2.8K WOB. DRILLING OFF AT 30-50 FPH. ABLE TO ACHIEVE DIRECTIONAL OBJECTIVES AND LAND BUILD. NEAR BIT INCLINATION AT 92°. 02:00 - 03:00 1.00 DRILL P PROD1 POOH OFF BOTTOM AT 24 FPM WITH 39K UP WEIGHT,DOWN WEIGHT 17K. PUMP AT 1.65 BPM WITH 3300 PSI. MUD WEIGHT IN AND OUT 9.5 PPG. VOLUME 282 BBLS,IA=225 PSI,OA=670 PSI. 'PULL 100',VERIFY CLEAN HOLE FOR FLOW CHECK. GO BACK DOWN AND FLOW CHECK WELLBORE-NO FLOW. POOH ABOVE WINDOW AT 9,811'MD TO 9,795' MD. FLOW CHECK-NO FLOW. OPEN EDC. 03:00 - 05:00 2.00 DRILL P PROD1 POOH AT 55 FPM WITH 35K UP WEIGHT. PUMP AT 1.8 BPM WITH 2800 PSI ON AN OPEN EDC. INCREASE RATE TO 2.2 BPM WITH 3500 PSI PULLING AT 67 FPM. AT 8,200'INCREASE TO 84 FPM WITH 32K UP WEIGHT. PULL TO BHA,FLOW CHECK-NO FLOW. 05:00 - 05:15 0.25 DRILL P PROD1 HOLD PRE JOB SAFETY MEETING FOR BHA. 05:15 - 05:30 0.25 DRILL P PROD1 TAG UP WITH BHA. BREAK OFF INJECTOR AND STAND BACK PULL AND LAY DOWN BUILD ASSEMBLY. 05:30 - 06:20 0.83 DRILL P PROD1 MAKE UP LATERAL ASSEMBLY. 06:20 - 08:00 1.67 DRILL P PROD1 RIH WITH LATERAL BHA 08:00 - 08:30 0.50 DRILL P PROD1 LOG TIE IN 08:30 - 09:00 0.50 DRILL P PROD1 CORRECT DEPTH-11'AND RIH TO CONTINUE DRILLING 09:00 - 09:10 0.17 DRILL P PROD1 OBTAIN SPR'S Printed 10/28/2014 9:58:38AM • North America-ALASKA-BP Page 11 of 17 Operation Summary Report Common Well Name:G-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/8/2014 End Date:10/16/2014 X3-015RH-C:(3,904,016.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:10/15/1981 12:00:00AM Rig Release:10/20/2014 Rig Contractor:NORDIC CALISTA UW:500292064700 Active datum:G-15©75.63usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) •09:10 - 11:00 1.83 DRILL P PROD1 BACK ON BOTTOM DRILLING FREE SPIN=3350 PSI AT 1.77 BPM RATE IN=1.78 BPM RATE OUT=1.76 BPM ROP=50 FPH WOB=1.98 K CIRC PSI= 3647 PSI MW IN=9.53 PPG MW OUT=9.52 PPG ECD =10.28 PPG IAP=190 PSI OAP=679 PSI PVT=284 BBLS DRILLED A FEW FEET AND RAN INTO A SHALE,GEO HAS DD COMING UP 5'TO 8960' UNLESS SOMETHING TELLS US SOMETHING DIFFERENT 11:00 - 12:10 1.17 DRILL P PROD1 STACK OUT AT 10670',PU PULLED 60K ABOVE THE WOB SUB,PU UNTIL CLEAN TO 10550' THIS IS A SHALE THAT STARTS AT-10560'TO -10610' RAN BACK DOWN AND SET DOWN AT 10570' WITH MOTOR WORK REDUCED PUMP RATE AND WORK DOWN MADE IT DOWN TO 10580'AND SET DOWN AGAIN WITH MOTOR WORK AT 0.55 BPM •PU AND SET DOWN AT 10575' PU AND REDUCE RATE TO 0.25 BPM AND RIH TO 10650' INCREASE RATE AND PULL BACK UP THROUGH TIGHT SPOT PULLED INTO SOMETHING AT 10568 THEN CLEANED UP REDUCE RATE&RIH,SET DOWN AT 10585' THEN POPPED THROUGH RIH TO 10650 AND PU THROUGH TIGHT SPOT AGAIN TO SEE IF IT CLEANS UP STILL GETTING MOTOR WORK AT 10580 WHILE PULLING THROUGH DON'T THINK IT IS GOING TO GO AWAY,PLAN ON REDUCED PUMP RATES WHILE TRIPPING PAST THIS INTERVAL SAWA LITTLE BUMP WHILE GOING DOWN AT 10585' 12:10 - 13:00 0.83 DRILL P PROD1 CONTINUE DRILLING AHEAD FREE SPIN=3350 PSI AT 1.77 BPM RATE IN=1.71 BPM RATE OUT=1.71 BPM ROP=91 FPH WOB=1.49 K CIRC PSI= 3776 PSI MW IN=9.56 PPG MW OUT=9.54 PPG ECD =10.35 PPG IAP=240 PSI OAP=558 PSI PVT=280 BBLS 12:45 PREP PITS TO SWAP MUD Printed 10/28/2014 9:58:38AM North America-ALASKA-BP Page 12 of 17 Operation Summary Report Common Well Name:G-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/8/2014 End Date:10/16/2014 X3-015RH-C:(3,904,016.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:10/15/1981 12:00:00AM Rig Release:10/20/2014 Rig Contractor NORDIC CALISTA UWI:500292064700 Active datum:G-15 @75.63usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 15:25 2.42 DRILL P PROD1 CONTINUE DRILLING AHEAD FREE SPIN=3350 PSI AT 1.77 BPM RATE IN=1.77 BPM RATE OUT=1.72 BPM ROP=74 FPH WOB=1.49 K CIRC PSI= 3776 PSI MW IN=9.56 PPG MW OUT=9.53 PPG ECD =10.38 PPG IAP=260 PSI OAP=583 PSI PVT=209 BBLS LOOKS LIKE WE DRILLED OUT OF 1 SHALE AND BACK INTO ANOTHER 13:40 SWAP TO NEW MUD GEO WANTS TO DROP BACK DOWN 1'TVD TO 8931' 15:25 - 15:40 0.25 DRILL P PROD1 STALL,PU TO 10550 TO CHECK THE SHALE THAT WAS TROUBLESOME EARLIER PU TO 10620 THEN JOG IN HOLE TO 10660 PU TO 10620 AND REDUCE RATE TO 0.25 BPM AND SEE IF THE SHALE IS BEHAVING COUPLE OF SMALL RATTY SECTIONS COMING UP WITH AS DRILLED TOOLFACE RIH WITH AS DRILLED TOOLFACE AND SEE IF WE SET DOWN 15:40 - 15:50 0.17 DRILL P PROD1 LOOKS GOOD,RIH TO CONTINUE DRILLING 15:50 - 18:30 2.67 DRILL P PROD1 CONTINUE DRILLING AHEAD FREE SPIN=3350 PSI AT 1.77 BPM RATE IN=1.74 BPM RATE OUT=1.72 BPM ROP=66 FPH WOB=1.89 K CIRC PSI= 3977 PSI MW IN=9.57 PPG MW OUT=9.53 PPG ECD =10.28 PPG IAP=239 PSI OAP=586 PSI PVT=31 BBLS STILL SWAPPING TO NEW MUD NEW MUD BACK TO SURFACE OBTAIN NEW SPR'S THEN CONTINUE DRILLING 18:30 - 20:00 1.50 DRILL P PROD1 DRILL AHEAD TO 10,898'MD,8,961'TVD AT 3 FPH. PUMP AT 1.7 BPM WITH 3460 PSI,FREE SPIN 3365 PSI,ECD 10.17 PPG. DOWN WEIGHT 14K,WOB 1.2K,UP WEIGHT 36K. 20:00 - 23:30 3.50 DRILL P PROD1 DRILL AHEAD TO 11,050'MD AT 44 FPH. PUMP AT 1.7 BPM WITH 3600 PSI,FREE SPIN 3380 PSI,ECD 10.38 PPG. DOWN WEIGHT 11K,WOB 1.88K,UP WEIGHT 37K. DRILLING IN GOOD SAND WITH RATE PICKING UP TO 100 FPH REAL TIME. Printed 10/28/2014 9.58:38AM North America-ALASKA-BP Page 13 of 17 Operation Summary Report Common Well Name:G-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/8/2014 End Date:10/16/2014 X3-015RH-C:(3,904,016.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:10/15/1981 12:00:OOAM Rig Release:10/20/2014 Rig Contractor:NORDIC CALISTA UWI:500292064700 Active datum:G-15 @75.63usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:30 - 00:00 0.50 DRILL P PROD1 PERFORM 450'WIPER TO WINDOW FROM 11,050'MD. UP WEIGHT 39K,BREAK OVER AT 49K OFF BOTTOM. PULL AT 17 FPM.PUMP AT 1.6 BPM WITH 3180 PSI. VOLUME 302 BBLS,IA=280 PSI,OA=630 PSI. REDUCE PUMP RATE TO 0.35 BPM AT 10,620' MD AND ORIENT TOOL FACE TO AS DRILLED. PULL AT REDUCED RATE OF 14 FPM THROUGH TROUBLED SHALES TO 10,550'MD. A LITTLE RATTY THROUGH SHALES WITH SLIGHT OVERPULL BUT NO HANG UPS. PULLING AT 10,500'AT MIDNIGHT. 10/14/2014 00:00 - 00:45 0.75 DRILL P PROD1 PERFORM WIPER TO WINDOW AT 9,811'MD. PULL AT 15 FPM WITH 35K UP WEIGHT. PUMP AT 1.7 WITH 3500 PSI. PULL WITH NO ISSUES FROM 10,500'MD. 00:45 - 01:00 0.25 DRILL P PROD1 RUN IN AND LOG TIE-IN. RUN AT 1.5 FPM WITH 17K DOWN WEIGHT. PUMP AT 0.65 BPM WITH 1365 PSI. LOG CORRECTION OF PLUS 8'. 01:00 - 01:45 0.75 DRILL P PROD1 RUN IN HOLE AT 28 FPM WITH 19K DOWN WEIGHT. PUMP AT 1.8 BPM WITH 3505 PSI. SLOW PUMP RATE GOING THROUGH SHALES AT 10550'TO 10620'TO 0.7 BPM WITH 1430 PSI.RUN AT 37 FPM WITH 19K DOWN WEIGHT. BOBBLE AT 10,596'(SHALE)TAKING WEIGHT. PICK UP TO WEIGHT.REDUCE RATE TO 0.35 BPM GO BACK THROUGH AND DID NOT SEE ANYTHING. RIH AT 30 FPM WITH 18K DOWN WEIGHT. PUMP AT 1.7 BPM WITH 3350 PSI. BOBBLE AT 10,793'BUT POPPED THROUGH. RUN IN HOLE TO BOTTOM WITH 2-4K DRAG. 01:45 - 03:00 1.25 DRILL P PROD1 DIRECTIONAL DRILL TO 11,095'MD AT 36 FPH ROP. PUMP AT 1.7 BPM WITH 3545 PSI,FREE SPIN 3350 PSI. DOWN WEIGHT 13K,WOB 2.1K,ECD 10.35 PPG. BREAK OVER UP WEIGHT 44K,UP WEIGHT 37K. 03:00 - 05:00 2.00 DRILL P PROD1 DIRECTIONAL DRILL TO 11,181,'MD AT 43 FPH ROP. PUMP AT 1.7 BPM WITH 3700 PSI,FREE SPIN 3400 PSI. DOWN WEIGHT 12K,WOB 1.6K,ECD 10.40 PPG. BREAK OF WEIGHT 43K,UP WEIGHT 36K. 05:00 - 06:00 1.00 DRILL P PROD1 DRILL AHEAD. 06:00 - 06:40 0.67 DRILL P PROD1 CONTINUE DRILLING AHEAD 06:40 - 09:10 2.50 DRILL P PROD1 PU AND OBTAIN SPR'S AND CONTINUE DRILLING Printed 10/28/2014 9:58:38AM ___.___...._ ... • North America-ALASKA-BP Page 14 of 17 Operation Summary Report Common Well Name:G-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/8/2014 End Date:10/16/2014 X3-015RH-C:(3,904,016.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:10/15/1981 12:00:00AM Rig Release:10/20/2014 Rig Contractor:NORDIC CALISTA UWI:500292064700 Active datum:G-15©75.63usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:10 - 09:55 0.75 DRILL P PROD1 DRILLED FROM 11271 TO 11450' FREE SPIN=3500 PSI AT 1.75 BPM RATE IN=1.70 TO 1.75 BPM RATE OUT=1.72 I TO 1.76 BPM ROP=80 TO 100 FPH WOB=1.98 K CIRC PSI=3647 TO 4050 PSI MW IN=9.60 PPG MW OUT=9.61 PPG ECD =10.59 PPG IAP=447 PSI OAP=807 PSI PVT=283 BBLS 09:55 - 11:05 1.17 DRILL P PROD1 DRILLED 450'PERFORM WIPER TO WINDOW TO CIRC A HIGH VIS PILL,BOTTOMS UP FROM 5-1/2 THEN TIE IN 10720 PULLED HEAVY WITH MOTOR WORK, RUN,STACKED DOWN WEIGHT AND POPPED ,FREE PU TO 10620'AND IT WAS A LITTLE RATTY ON THE WEIGHT RIH TO 10750 TO MAKE SURE HOLE IS CLEAN BELOW US AND SET DOWN WT AT 10650 2 TIMES WITH NO WOB,OBSTRUCTION IS ABOVE MADE IT THROUGH CLEAN AND RAN IN TO 10750 PU,8K OVER PULL AT 10720'THEN CLEAN UP TO 10620 REDUCE PUMP RATE TO PULL THROUGH 1 SHALE FROM 10620 TO 10570 8K OVER PULL AT 10587 BUT CLEAN AFTER THAT CONTINUE POOH TO THE WINDOW 11:05 - 12:35 1.50 DRILL P PROD1 AT THE WINDOW,OPEN THE EDC,HIGH VIS PILL AT THE BHA,CIRC AT MAX RATE POOH TO THE 5-1/2 THEN CIRC A BOTTOMS UP 12:35 - 12:50 0.25 DRILL P PROD1 BOTTOMS UP BROUGHT UP MAYBE A 10% INCREASE IN CUTTING,MORE CLAY BALLS& WALL CAKE THAN CUTTINGS RIH TO LOG TIE IN 12:50 - 13:45 0.92 DRILL P PROD1 CORRECT DEPTH+6'AND RIH 13:45 - 15:00 1.25 DRILL P PROD1 BACK ON BOTTOM DRILLING FREE SPIN=3560 PSI AT 1.73 BPM RATE IN=1.73 BPM RATE OUT=1.76 BPM ROP=94 FPH WOB=1.82 K CIRC PSI= 3834 PSI MW IN=9.61 PPG MW OUT=9.56 PPG ECD =10.47 PPG IAP=442 PSI OAP=865 PSI PVT=279 BBLS 15:00 - 15:25 0.42 DRILL P PROD1 CONTINUE DRILING AHEAD FREE SPIN=3560 PSI AT 1.73 BPM RATE IN=1.73 BPM RATE OUT=1.76 BPM ROP=94 FPH WOB=1.82 K CIRC PSI= 3834 PSI MW IN=9.61 PPG MW OUT=9.56 PPG ECD =10.47 PPG IAP=442 PSI OAP=865 PSI PVT=279 BBLS STARTING TO SEE WT TRANSFER ISSUES, MUD IS IN GOOD SHAPE WITH ONLY 0.7% SOLIDS Printed 10/28/2014 9:58:38AM North America-ALASKA-BP Page 15 of 17 Operation Summary Report Common Well Name:G-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/8/2014 End Date:10/16/2014 X3-015RH-C:(3,904,016.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:10/15/1981 12:00:00AM •Rig Release:10/20/2014 Rig Contractor:NORDIC CALISTA UWI:500292064700 Active datum:G-15©75.63usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:25 - 15:30 0.08 DRILL P PROD1 NOT ABLE TO MAKE ANY HOLE,ROP IS NOT CONSISTENT STARTING AT 11530',WE CAN RUN INTO BOTTOM,GET A LITTLE MOTOR, DRILLS OFF THEN WON'T SLIDE.CADE PREDICTS WE WILL NEED THE AGITATOR AT 11,600'AND IT LOOKS LIKE ITS RIGHT.FLOW CHECK WELL ON BOTTOM,THEN POOH AND PU THE AGITATOR 15:30 - 16:30 1.00 DRILL P PROD1 GOOD NO FLOW,POOH PVT=275 BBLS PULLED HEAVTYAT 11,100 HOLE IS RATTY THROUGH SHALE AT 10900 TO-10750 16:30 - 16:35 0.08 DRILL P PROD1 FLOW CHECK WELL ABOVE THE WINDOW 16:35 - 18:30 1.92 DRILL P PROD1 GOOD NO FLOW,POOH, 18:30 - 19:15 0.75 DRILL P PROD1 PJSM FOR HANDLE BHA. RB BHA#3 TO HQT SUB AND BREAK BIT;BIT GRADE 1-1. 19:15 - 19:30 0.25 DRILL P PROD1 PU TEST JOINT AND FUNCTION TEST BOP FROM DRILLERS CONSOLE ON RIG FLOOR. 19:30 - 20:00 0.50 DRILL . P PROD1 PU BHA#4 WITH AGITATOR AND 3.25" BICENTER. ISTAB ON INJECTOR AND PRESSURE TEST QTS TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES. 20:00 - 22:30 2.50 BRILL P PROW RIH AT 100 FPM. STOP AT 300'AND TEST AGITATOR;GOOD TEST. OPEN EDC AND CONTINUE RIH TO WINDOW. CLOSE EDC,LOG TIE-IN AT RA TAG(-10' I CORRECTION). PVT=260 BBLS 22:30 - 23:45 1.25 DRILL P PROD1 OPEN EDC AND LOG CCL FROM 8650'TO 9550'(BOTTOM GAS LIFT MANDREL TO 3-3/16" XO). 23:45 - 00:00 0.25 DRILL P PROD1 CLOSE EDC AND RIH PUMPING MINIMUM RATE. 10/15/2014 0000 - 01:15 1.25 DRILL P PROD1 RIH AND TAG BOTTOM AT 11,567'. 01:15 - 02:45 1.50 DRILL P PROD1 OBTAIN SPRS AND DRILL AHEAD IN THE LATERAL SECTION. I FREE SPIN=3740 PSI AT 1.7 BPM. RATE IN=1.6 BPM RATE OUT=1.59 BPM ROP=-90 FPH WOB=1.8 K CIRC PSI= 3900 PSI MW IN=9.60 PPG MW OUT=9.59 PPG ECD =10.5PPG IAP=197 PSI OAP=615 PSI PVT=263 BBLS GETTING 3'-5'DRILL-OFFS WITH CLOSE TO 1000'ON THE MUD;CONDUCT SEVERAL BHA WIPER TRIPS;UNABLE TO HOLD A STEADY SLIDE. DECIDE TO SWAP SYSTEM TO NEW DRILLING MUD. 02:45 - 03:15 0.50 DRILL P PROD1 DISPLACE OPEN HOLE WITH CLEAN DRILLING MUD. 03:15 - 04:00 0.75 DRILL P PROD1 DRILL AHEAD TO 11,660'WHILE DISPLACING THE REMAINING SYSTEM TO CLEAN DRILLING MUD. I • FREE SPIN=3550 PSI AT 1.6 BPM. Printed 10/28/2014 9:58:38AM North America-ALASKA-BP Page 16 of 17 Operation Summary Report Common Well Name:G-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:10/8/2014 End Date:10/16/2014 X3-015RH-C:(3,904,016.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:10/15/1981 12:00:00AM Rig Release:10/20/2014 Rig Contractor:NORDIC CALISTA UWI:500292064700 Active datum:G-15 @75.63usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:00 - 09:00 5.00 DRILL N SFAL PROD1 WHILE SWAPPING MUD,THE 6"BUTTERFLY VALVE TO THE#1 PIT TANK,FROM THE DISCHARGE LINE,FAILED. PULL TO WINDOW,CIRCULATE BOTTOMS UP AND WAIT ON NEW VALVE TO ARRIVE ON LOCATION. LOTO MUD LINE TO REPLACE VALVE MUD ENGINEER CHECKING MUD PROPERTIES TO SEE IF ENOUGH NEW MUD IS IN THE SYSTEM TO ALLOW US TO CONTINUE DRILLING 09:00 - 10:30 1.50 DRILL N SFAL PROD1 I BUTTERFLY VALVE IS CHANGED OUT MUD PROPERTIES ARE IN SPEC BUT HAVE 2-3%DRILL SOLIDS IN A NEW MUD SYSTEM AND THE PITS ARE FULL CALLED THE DRLG SUPT WITH A PLAN TO CONTINUE MOVING FORWARD AND WE ARE 41 GOING TO RIH TO CONTINUE DRILLING 10:30 - 10:40 0.17 DRILL P PROD1 OBTAIN SPR'S,UPDATE KILL SHEET THEN CONTINUE DRILLING AHEAD 10:40 - 11:35 0.92 DRILL P PROD1 BACK ON BOTTOM DRILLING FREE SPIN=3700 PSI AT 1.61 BPM RATE IN=1.61 BPM RATE OUT=1.60 BPM ROP=76 FPH WOB=1.25 K CIRC PSI= 3831 PSI MW IN=9.58 PPG MW OUT=9.55 PPG ECD =10.46 PPG IAP=151 PSI OAP=503 PSI PVT=302 BBLS 11:35 - 12:40 1.08 DRILL P PROD1 AGITATOR DOES NOT APPEAR TO BE WORKING CONTINUE DRILLING AHEAD FREE SPIN=3700 PSI AT 1.61 BPM RATE IN=1.68 BPM RATE OUT=1.69 BPM ROP=76 FPH WOB=1.38 K CIRC PSI= 4021 PSI MW IN=9.59 PPG MW OUT=9.58 PPG ECD =10.44 PPG IAP=206 PSI OAP=558 PSI PVT=299 BBLS 12:40 - 13:30 0.83 DRILL P PROD1 AGITATOR DOES NOT APPEAR TO BE WORKING CONTINUE DRILLING AHEAD FREE SPIN=3700 PSI AT 1.61 BPM RATE IN=1.68 BPM RATE OUT=1.69 BPM ROP=81 FPH WOB=0.99 K CIRC PSI= 4017 PSI MW IN=9.59 PPG MW OUT=9.58 PPG ECD =10.44 PPG IAP=227 PSI OAP=569 PSI PVT=296 BBLS 13:30 - 15:15 1.75 DRILL P PROD1 AGITATOR SEEMS TO BE WORKING INTERMITTENTLY CONTINUE DRILLING AHEAD FREE SPIN=3700 PSI AT 1.61 BPM RATE IN=1.73 BPM RATE OUT=1.70 BPM ROP=80 FPH WOB=1.21 K CIRC PSI= 4182 PSI MW IN=9.59 PPG MW OUT=9.55 PPG ECD =10.44 PPG IAP=273 PSI OAP=610 PSI PVT=295 BBLS Printed 10/28/2014 9:58:38AM • North America-ALASKA-BP Page 17 of 17 Operation Summary Report Common Well Name:G-15 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date: 10/8/2014 End Date: 10/16/2014 X3-015RH-C:(3,904,016.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:10/15/1981 12:00:00AM Rig Release:10/20/2014 Rig Contractor:NORDIC CALISTA UWI:500292064700 Active datum:G-15(75.63usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:15 - 17:10 1.92 DRILL N DPRB PROD1 DRILLED TO 11887'AND GOT DIFFERENTUALLY STUCK CIRC A BOTTOMS UP 17.10 - 18:25 1.25 DRILL P PROD1 CIRCULATED A BOTTOMS UP PULL TO MAX WT AFTER 5 MINUTES AND PULLED FREE POOH TO LOG TIE IN 18:25 - 20:00 1.58 DRILL P PROD1 CORRECT DEPTH+10'AND RIH. STACK OUT AT 10,778'WITH 4-5K. WORK AREA AND ALTERNATE TF;BRING RATE TO 0.3 BPM AND BREAK THROUGH. RIH TO • 11,888'. 20:00 - 22:30 2.50 DRILL P PROD1 POH TO WINDOWAT 25 FPM. IN/OUT=1.5 BPM/1.4 BPM. PVT=312 BBLS. WORK THROUGH TIGHT HOLE FROM 10,650'- 10,550'WITH 15K-20K OVERPULLS. PASS THROUGH X2 AT 0.5 BPM. !RIH TO PREVIOUS TROUBLE DEPTH OF —10,778'AND STACK OUT AGAIN AT 10,775. (WORK AREA AND BREAK THROUGH AT 0.4 BPM. POH TO WINDOW 22:30 - 00:00 1.50 DRILL P PROD1 RIH FROM WINDOWTOTD. LOAD LINER RUNNING PILL IN COIL. • IN/OUT=1.5 BPM/1.6 BPM. PVT=304 BBLS. 10/16/2014 00:00 - 04:00 4.00 DRILL P PROD1 FLOW CHECK AND POH LAYING IN LINER RUNNING PILL WITH 2#/BBL ALPINE BEADS. PULL TO WINDOW,FLOW CHECK AND PUMP 20 BBLS HIGH-VIS SWEEP. OPEN EDC,PUMP MAX RATE AND POH AT 80 FPM. IN/OUT=2.3 BPM/2.O BPM. PVT=304 BBLS. 04:00 - 04:30 0.50 DRILL P PROD1 FLOW CHECK AT SURFACE;STATIC. HOLD PJSM FOR HANDLING BHA. 04:30 - 05:15 0.75 DRILL P PROD1 POP OFF WELLAND STAND BACK INJECTOR. LD MWD TOOLS,AGITATOR,MOTOR AND BIT. BIT GRADE: 1-3-CT-G-X-I-NO-TD RB REMAINING BHAAND BREAK UQC. Printed 10/28/2014 9:58:38AM North America-ALASKA-BP Page 1 of 7 Operation Summary Report Common Well Name:G-15 AFE No Event Type:COM-ONSHORE(CON) Start Date:10/16/2014 End Date:10/19/2014 X3-015RH-C:(1,444,118.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:10/15/1981 12:00:00AM Rig Release:10/20/2014 Rig Contractor:NORDIC CALISTA UWI:500292064700 Active datum:G-15 @75.63usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations - - (hr) (usft) 10/16/2014 05:15 - 06:30 1.25 CASING P RUNPRD SHUT-IN TREE,INSTALL AND PRESSURE TEST NIGHT CAP TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES. 06:30 - 07:20 0.83 CASING P RUNPRD ELINE SEALED WALK THROUGH LINER WITH DRILLER&BTT HAND TO ENSURE ITS LAID OUT AS PER DESIGN LOAD BTT HANDLING EQUIPMENT&SUBS ON THE RIG 07:20 - 07:55 0.58 CASING P RUNPRD VALVE CREW ON LOCATION TO ASSIST OPENING THE SSV THAT GOT PRESSURE LOCKED 07:55 - 08:05 0.17 CASING P RUNPRD SSV OPEN;FILL HOLE WELL TOOK 2 BBLS FLOW CHECK WELL TO-REMOVE NIGHT CAP 08.05 - 08:40 0.58 CASING P RUNPRD GOOD NO FLOW,PUMP ACROSS THE TOP HOLE IS STILL FULL,REMOVE NIGHT CAP PU 2 JTS OF PH6 MUTHE INJECTOR TO THE PH6,PT THE QTS TO PUMP OUT THE SLACK PUMP 25 BBLS OF FRESH WATER INTO THE COIL 08:40 - 09:10 0.50 CASING P RUNPRD _REMOVE THE INJECTOR PUMPED 245'OF 310'OUT OF THE REEL 09:10 - 09:30 0.33 CASING, P RUNPRD STBK THE INJECTOR&LD THE PH6 09:30 - 09:50 0.33 CASING P RUNPRD REOPEN THE HOT WORK PERMIT TO SEAL THE END OF THE WIRE AGAIN SHUT IN THE SWAB,INSTALL THE NIGHT CAP AND TEST 09:50 -- 10:10 0.33 CASING P RUNPRD PT IS GOOD,HOLD A PJSM MOVE THE INJECTOR,CUT PIPE,SEAL THE WIRE, INSTALL THE CTC THEN PUMP A DRIFT BALL 10:10 - 10:45 0.58 CASING P RUNPRD INSPECT PIPE FOR CTC INSTALL SEAL WIRE MU BTT CTC AND PULL TEST TO 35K GOOD PULL TEST PT CTC TO 3500 PSI GOOD PT MU A NOZZLE TO PUMP THE 3/4"DRIFT BALL '10:45 - 11:05 0.33 CASING P RUNPRD OPEN THE WELL TO A CLOSED CHOKE NO PRESSURE FILL THE HOLE HOLE TOOK 1 BBL FLOW CHECK WELL 11:05 - 11:40 0.58 CASING P RUNPRD GOOD NO FLOW REMOVE THE NIGHT CAP STAB INJECTOR ON THE WELL LOAD 3/4"DRIFT BALL AND PUMP AROUND 11:40 - 12:10 0.50 CASING P RUNPRD BALL RECOVERED FROM NOZZLE,PREP FLOOR TO RUN LINER 12:10 - 12:40 0.50 CASING P RUNPRD HOLD PJSM TO MU THE LINER 12:40 - 16:30 3.83 CASING P RUNPRD MAKE UP LINER 14:30 MU 1000'OF LINER,RU THE HEAD PIN AND FILL WITH MUD 15:00 CONTINUE RUNNING LINER Printed 10/28/2014 9:59:05AM North America-ALASKA-BP Page 2 of 7 Operation Summary Report Common Well Name:G-15 AFE No Event Type:COM-ONSHORE(CON) Start Date:10/16/2014 End Date:10/19/2014 X3-015RH-C:(1,444,118.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:10/15/1981 12:00:00AM Rig Release: 10/20/2014 Rig Contractor:NORDIC CALISTA UWI:500292064700 Active datum:G-15 @75.63usft(above Mean Sea Level) Date From-To Hrs Task Code i NPT NPT Depth Phase Description of Operations (hr) (usft) 16:30 - 17:35 1.08 CASING P RUNPRD ALL LINER RAN,FILL PIPE THEN MU LINER RUNNING BHA 17:35 - 18:15 0.67 CASING P RUNPRD LINER BHA RAN,PU THE INJECTOR AND MU TO THE BHA 18:15 - 21:30 3.25 CASING P RUNPRD RIH WITH LINER BHA. STACK OUT 5K AND WORK THROUGH 10,770' (X4). TAG TD WITH 9'CORRECTION. PU WEIGHT 46K;STACK DOWN 10K AND BREAK CIRCULATION. 21:30 - 23:15 1.75 CASING P RUNPRD PUMP 5/8"BALL PER CTD AT 1 BPM. UNABLE TO GET BALL TO SEAT;PUMP 40 BBLS OVER DISPLACEMENT AND STILL NO SEAT. PRESSURE DUMP FROM FLOOR VALVE AND CIRCULATE AT 2.2 BPM AND HEAR BALL ROLLING IN REAL AGAIN. CONTINUE AT 2.2 BPM FOR 5 BBLS ONCE BALL IS NO LONGER AUDIBLE AND ACROSS THE GOOSE NECK SLOW RATE TO 0.7 BPM,1800 PSI CIRCULATING PRESSURE AND CONFIRM •BALL SEAT WITH 900 PSI INCREASE AND 30K BREAKOVER WEIGHT. 23:15 - 00:00 0.75 CASING P - RUNPRD DISPLACE WELL TO 1%KCL. IN/OUT RATE=2.3 BPM/2.2 BPM "CIRCULATING PRESSURE 2150 PSI AT 1.5 BPM 10/17/2014 00:00 - 02:30 2.50 CASING P RUNPRD DISPLACE WELL TO 1%KCL. GET GOOD RETURNS TO SURFACE AND ADJUST TO PLANNED DISPLACEMENT RATE OF CEMENT. FILL PITS 2 AND 3 WITH POWERVIS CONTAMINATE. IN/OUT RATE=1.6 BPM/1.5 BPM;LOSS I RATE NOT SUBSTANTIAL ENOUGH TO ADJUST PLANNED CEMENT VOLUME. - 02:30 - 03:00 0.50 CASING P RUNPRD HOLD PJSM WITH RIG CREWAND CEMENTERS FOR HIGH PRESSURE TESTING AND PUMPING CEMENT. 'DISCUSS PRESSURE CROSS-CHECK CARD WITH CEMENTERS. 03:00 - 03:30 0.50 CASING P RUNPRD ,PRESSURE TEST CEMENT LINES TO 300 PSI LOW/5000 PSI HIGH FOR 5 MINUTES. SET RIG TRIPS TO 4700 PSI. 03:30 - 11:30 8.00 CASING N CEMT RUNPRD BATCH MIX 18 BBLS CEMENT TO 15.8 PPG. DURING PRE-JOB,WSL COVERED 15.8 PPG • MIX DENSITY WITH CEMENTERS AS IN WELL PLAN. OCN AND CEM-CADE CALLED FOR 15.3 PPG SLURRY. CEMENTERS REALIZED THIS PRIOR TO PUMPING,HOWEVER THE 18 BBLS HAD ALREADY BEEN MIXED. PUMP SLURRY TO CONTAMINATE 150 BBLS TRUCK W/30 GAL D110. ROUND-TRIP CEMENTERS FOR MIX WATER AND CEMENT LOAD-OUT. WAIT ON RETURN. 11:30 - 14:40 3.17 CASING N CEMT RUNPRD FIRST THICKENING TIME TEST RAN LONG, RETEST - Printed 10/28/2014 9:59:05AM North America-ALASKA-BP Page 3 of 7 Operation Summary Report Common Well Name:G-15 AFE No Event Type:COM-ONSHORE(CON) Start Date:10/16/2014 End Date:10/19/2014 X3-015RH-C:(1,444,118.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:10/15/1981 12:00:00AM Rig Release:10/20/2014 Rig Contractor:NORDIC CALISTA UWI:500292064700 Active datum:G-15 @75.63usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:40 - 18:45 4.08 CASING N CEMT RUNPRD ADD 10 BBLS OF KCL TO PIT 1,LOST 17 BBLS IN 8.5 HRS OR-2 BPH INCREASE RATE TO 1.5 BPM FOR BASELINE 1.5 BPM=2010 PSI IN=1.50 BPM OUT=1.44 BPM LOSS RATE OF 3.6 BPH AT THIS RATE "OBTAIN LAB TESTS FROM SCHLUMBERGER CREW CHANGE,PUSH WATER TO CEMENTERS FOR PT. 18:45 - 19:15 0.50 CASING N CEMT RUNPRD HOLD PJSM FOR HIGH PRESSURE TESTING AND PUMPING CEMENT. 19:15 - 20:00 0.75 CASING N CEMT RUNPRD PRESSURE TEST CEMENT LINES TO 300 PSI LOW/5000 PSI HIGH FOR 5 MINUTES. 20:00 - 22:00 2.00 CASING P RUNPRD BATCH UP 18 BBLS OF 15.3 PPG SLURRY. PUMP 12.2 BBLS PRODUCTION CEMENT PER PLAN. 2035=SLURRY AT DENSITY;PUMP 5 BBLS KCL AHEAD AND ZERO MM IN/OUT AT 13.5 PPG. 2050=LOAD 12.2 BBLS SLURRY IN COIL; SHUT DOWN PUMPS,SHUT IN REAL AND WASH UP CEMENT LINE. 2055=SWAP TO RIG PUMPS AND CHASE SLURRY WITH POWERVIS(REDUCE RATE AT 37.2 BBLS IN AS CEMENT HITS LRT). 2115=PUMP 48.1 BBLS(TOTAL);CEMENT TO SHOE. ZERO OUT MM. 2115=PUMP 48.4 BBLS(TOTAL)AND SHUT DOWN PUMP. PU TO NEUTRAL+13'AND STOP. PUMPS ON,EXHAUST 2 BBLS CMT/3 BBLS POWERVIS. CIRCULATING PRESSURE AT 1.5 BPM=1800 PSI. 2122=SHUT DOWN PUMP,OPEN BAKER CHOKE AND SET BACK DOWN. ZERO IN MM. 2127=PRESSURE UP AND SHEAR LWPAT 2900 PSI(0.6 BBLS PUMPED). 2134=BUMP PLUG AT 1.4 BPM/9.9 BBLS DISPLACEMENT/3700 PSI. 2135=FLOATS HOLD. PICK UP AND CONFIRM PRESSURE DROP/UNSTING FROM LINER. PUMP 5 BBLS AT MIN RATE AT TOP OF LINER. 22:00 - 23:45 1.75 CASING P RUNPRD -POH PUMPING POWERVIS CONTAMINATE AT 100 FPM,1.4 BPM IN/1 BPM OUT *TOP OF EXHAUST-8700'PRIOR TO TRIP. POWERVIS/TOP OF EXHAUST CONVERGE- 8000',HOWEVER,ADEQUATE VOLUME IN PITS TO BRING POWERVIS TO SURFACE. -FLOW CHECK AT SURFACE. -RD CEMENTERS. 23:45 - 00:00 0.25 CASING P RUNPRD HOLD PJSM FOR LD BHA. 10/18/2014 00:00 - 00:45 0.75 CASING P RUNPRD POP OFF INJECTOR,SET IN LEGS. LD LINER RUNNING BHAAND RECOVER 5/8" BALL AND CONFIRM STINGER SHEAR PIN HAS SHEARED. 00:45 - 01:30 0.75 BOPSUR P OTHCMP RU HOSE TO PUMP OUT STACK. VERIFY SWAB,SSV AND MASTER VALVES CLOSED AND LEAK TIGHT TEST TREE VALVES. Printed 10/28/2014 9:59:05AM North America-ALASKA-BP Page 4 of 7 Operation Summary Report Common Well Name:G-15 AFE No Event Type:COM-ONSHORE(CON) Start Date:10/16/2014 End Date 10/19/2014 X3-015RH-C:(1,444,118.00) Project Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:10/15/1981 12:OO:OOAM Rig Release:10/20/2014 Rig Contractor:NORDIC CALISTA UWI:500292064700 Active datum:G-15 @75.63usft(above Mean Sea Level) Date From-To � Hrs Task Code NPT NPT Depth Phase 1 Description of Operations (hr) (usft) 01:30 - 03:15 1.75 BOPSUR P OTHCMP HOLD PJSM; BLEED ACCUMULATOR PRESSURE AND LOTO. REMOVE 2-3/8"PIPE/SLIP RAMS. VERIFY RAM SIZING AND INSTALL 1"CS HYDRILL PIPE/SLIP RAMS. 03 15 - 05:45 2.50 BOPSUR P OTHCMP PRESSURE UP ACCUMULATOR. RIG UP AND PRESSURE TEST 1"COMBIS RAMS AND ANNULAR TO 250 PSI LOW/3500 HIGH FOR 5 MINUTES. .INSTALL RISER CAP PERFORM BOP SHELL TEST TO 250 PSI LOW/4500 PSI HIGH FOR 5 MINUTES. 05:45 - 06:45 1.00 EVAL P OTHCMP OPEN TREE VALVES TOA CLOSED CHOKE. FLOW CHECK AND FILL HOLE;WELL TOOK<1 BBL. PU LOGGING BHA. --- -- -- -06:45 -- 07:05 0.33 EVAL P OTHCMP HOLD PJSM TO MU LOGGING BHA. 07:05 - 07:30 0.42 EVAL P OTHCMP PU ATLAS LOGGING TOOL. 07:30 - 09:10 1.67 EVAL P OTHCMP MU MCSH TO LOGGING TOOLS TOOL PROGRAMED FOR 8.5 HRS OF RUN TIME TOOL INITIATED AT 07:31 WITH A 4 HR f DELAYED START TIME TOOL WILL TURN ON AT 11:31 AND WILL RUN FOR 8.5 HRS 3.5 HRS FOR BHA MU 1.0 HRS FOR INJECTOR MU&TEST 1.5 HRS FOR RIH TO 9100' 1.5 HRS FOR LOGGING DOWN FROM 9050'TO -11850 AT 20 FPM 0.5 HRS FOR PERF PILL DISPLACEMENT i 2.5 HRS FOR LOGGING UP FROM 11850 TO 9100'AT 30 FPM 2.0 HRS FOR EXTRA TIME INCASE SOMETHING RUNS LONGER THAN EXPECTED IF EVERYTHING TIMES OUT AS PLANNED THE 'TOOL SHOULD SHUT OFF WHILE FLOW CHECKING THE WELL AT SURFACE,THEN THERE WILL BE-3.5 HRS TO REMOVE THE INJECTOR AND STBK THE CSH 09:10 - 09:25 0.25 EVAL P OTHCMP HOLD KWT DRILL WHILE RUNNING CSH 09:25 - 09:40 0.25 EVAL P OTHCMP CONTINUE RUNNING CSH 09:40 - 10:00 0.33 EVAL P OTHCMP MU THE UPPER BHA 10:00 - 10:15 0.25 EVAL P OTHCMP PU THE INJECTOR AND MU TO THE BHA 10:15 - 10:30 0.25 EVAL P OTHCMP PT THE QTS 10:30 - 11:55 1.42 EVAL P OTHCMP RIH 11:10 CMT AT 1780 PSI COMPRESSIVE STRENGTH 11:31 THE TOOL IS ON AND WARMING UP Printed 10/28/2014 9'59'05AM North America-ALASKA-BP Page 5 of 7 Operation Summary Report Common Well Name:G-15 AFE No Event Type:COM-ONSHORE(CON) Start Date:10/16/2014 End Date: 10/19/2014 X3-015RH-C:(1,444,118.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 I Spud Date/Time:10/15/1981 12:00:00AM Rig Release:10/20/2014 Rig Contractor:NORDIC CALISTA UWI:500292064700 Active datum:G-15 @75.63usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:55 - 13:35 1.67 EVAL P OTHCMP STOP AT 9100'AND VERIFY DEPTH WITH ATLAS DEPTHS LOOG GOOD,PU AND COMPARE DEPTHS DEPTHS ARE GOOD RIR TO 9100'AND START LOGGING DOWN. 13:35 - 14:10 0.58 EVAL P OTHCMP TAG AT 11858.9'UNCORRECTED PROJECTED PBTD IS 11849,OUR NOR MAL CORRECTION ON THIS WELL HAS BEEN I MINUS 9-10'AND THAT WOULD PUT US ON DEPTH WITH WHERE IT SHOULD BE. LINE UP TO PUMP PERF PILL 14:10 - 16:35 2.42 EVAL P OTHCMP PERF PILLAT THE PORTED SUB, RETAG,TAG SAME DEPTH AT 11859 ALLOWA FEW BBLS OUT THEN LOG UP WHILE LAYING IT IN 16:35 - 16:40 0.08 EVAL P OTHCMP STOP AT 9050'AND PAUSE FORA FEW MINUTES 16:40 - 16:50 0.17 EVAL P OTHCMP I RIH TO 9278'TO PAINT AND EOP FLAG FOR PERF RUN 16:50 - 16:55 0.08 EVAL P OTHCMP PAINT A YELLOW FLAG FOR 6400'AT 9278' (BHA=2878') II FLOW CHECK WELL 16:55 - 18:10 1.25 - EVAL P OTHCMP GOOD NO FLOW,POOH DISPLACING WELL TO KCL 18:10 - 18:20 - 0.17 EVAL P OTHCMP FLOW CHECK WELL. 18:20 - 18:30 0.17 EVAL P OTHCMP GOOD NO FLOW,TAG UP. 18:30 - 18:45 0.25 EVAL P • OTHCMP PJSM FOR LD LOGGING BHA. 18:45 - 21:15 2.50 EVAL P OTHCMP LD LOGGING BHA. MARKER JOINT TO SURFACE AT 20:35;STAND BY ON TOOL FOR 10 MINUTES. PULL LOGGING TOOLS TO SURFACE AND LD. �DOWNLOAD DATAAND SEND TO GEOS. RPM LOG(-7'CORRECTION) *PBTD=11,849.31' 21:15 - 23:00 1.75 EVAL P OTHCMP INSTALL NIGHT CAP AND PERFORM INJECTIVITY TEST TO 2400 PSI PER PLAN. BRING PUMP RATE ON SLOWAND HOLD AT 0.49 BPM;INJECTION PRESSURE STABALIZE I AT 1540 PSI. BRING RATE UP TO 1.33 BPM;INJECTION PRESSURE STABALIZE AT 2325 PSI. BRING RATE UP TO 1.37 BPM;INJECTION PRESSURE STABALIZE AT 2380 PSI;HOLD FOR-1 MINUTE,SHUT DOWN PUMPS AND OPEN CHOKE. FLOW CHECK AND REMOVE NIGHT CAP. PU PERFORATING TOOLS TO RIG FLOOR. 23:00 - 23:30 0.50 EVAL P OTHCMP HOLD PJSM FOR MU PERFORATING BHAAND GET FINAL PERFORATION MEMO FROM GEOS. 23:30 - 00:00 0.50 EVAL P OTHCMP MU PERFORATING BHA. 10/19/2014 00:00 - 02:30 2.50 PERF P OTHCMP MU PERFORATING BHA. 02:30 - 02:45 0.25 PERF P OTHCMP PU INJECTOR AND STAB ON WELL. 02:45 - 03:00 0.25 PERF P OTHCMP MU AND PT QTS TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES. Printed 10/28/2014 9:59:05AM • North America-ALASKA-BP Page 6 of 7 Operation Summary Report Common Well Name:G-15 AFE No Event Type:COM-ONSHORE(CON) Start Date:10/16/2014 End Date: 10/19/2014 X3-015RH-C:(1,444,118.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 Spud Date/Time:10/15/1981 12:00:00AM Rig Release:10/20/2014 Rig Contractor:NORDIC CALISTA UWI:500292064700 Active datum:G-15 @75.63usft(above Mean Sea Level) _ Date From-To Hrs I Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 05:15 2.25 PERF P OTHCMP RIH WITH PERF BHA AT 100 FPM. CORRECT DEPTH AT EOP FLAG TO 9281'. 0.5 BPM IN/0.8 BPM OUT. PVT=216 BBLS 05:15 - 06:00 • 0.75 PERF P OTHCMP TAG TD AT 11,848.6'. PU AND CONFIRM TAG AT 11,848.3'AND CORRECT TO PBTD OF 11,849.3'. PU TO BREAKOVER AT 35K(X2),WITH 7.5' STRETCH. RUN PERFORATING SEQUENCE ON BOTTOM; GUNS FIRE ON DEPTH AT 11,848.0'. 06:00 - 06:45 0.75 PERF P OTHCMP POH HOLDING 250 PSI BACK-PRESSURE. -- 06:45 - 06:50 0.08 PERF P OTHCMP ABOVE THE TOL,LOST 2 BELS ON TRIP OUT BLEED OFF WHP AND FLOW CHECK WELL 06:50 - 08:05 1.25 PERF P OTHCMP GOOD NO FLOW,POOH 08:05 - 08:25 0.33 PERF P OTHCMP FLOW CHECK WELL,TRIP SHEET 1:1 HOLD PJSM TO REMOVE THE INJECTOR,LD •THE UPPER BHA,MU THE CSH THAT WAS STOOD BACK FROM THE FIRST RUN,FLUSH THE CSH WITH FRESH WATER,THEN STBK THE 1"CSH AND LD THE SPENT GUNS 08:25 - 12:30 4.08 PERF P OTHCMP TEST CROWN O MATIC LD THE UPPER BHA,MU CSH FROM FIRST RUN TO FLUSH WITH FRESH WATER THEN STBK AND LD GUNS 12:30 - 12:40 0.17 PERF P • OTHCMP AT THE MARKER JOINT,HOLD A KWT DRILL, I STAB THE WO SLB TO COME TO THE RIG FLOOR AND LET THE CREW GET A QUICK I BITE TO EAT 12:40 - 13:00 ! 0.33 PERF P OTHCMP HOLD PJSM TO STBK THE LAST STAND OF • CSH,RD CSH HANDLING EQUIP,RU TCP HANDLING EQUIP&FARR TONGS TO BREAK OUT THE GUNS 13:00 - 15:15 2.25 PERF P OTHCMP CONTINUE PERF BHA LD 15:15 - 16:00 0.75 PERF P OTHCMP PERF GUNS OOH AND ALL SHOTS FIRED LOAD OUT SPENT GUNS AND HANDLING I EQUIPMENT CALL OUT VALVE CREW TO BE ON LOCATION AT 17:00 TO SET THE TWC 16:00 - 16:20 0.33 PERF P POST I HOLD A PJSM TO PU THE INJECTOR AND MU A NOZZLE BHA W/DFCV'S TO FREEZE PROTECT THE WELL FROM 2500'WITH 58 BBLS OF DIESEL 16:20 - 16:40 0.33 PERF P POST STAB INJECTOR ON AND PT THE QTS 16:40 - 17:05 0.42 PERF P POST RIH TO FP THE WELL 17:05 - 17:40 0.58 PERF P POST POOH LAYING IN DIESEL 17:40 - 17:45 0.08 PERF P POST FLOW CHECK WELL AT 200' 17:45 - 17:55 0.17 PERF P POST ,GOOD NO FLOW,TAG UP HOLD PJSM WITH GREASE&VALVE CREWS TO SERVICE TREE AND SET TWC 17:55 - 19:00 1.08 PERF P POST 'REMOVE THE INJECTOR AND GREASE THE TREE 19:00 - 19:50 0.83 PERF P POST HOLD PJSM;PU LUBRICATOR TO FLOOR,MU LUBRICATOR AND TWC 19:50 - 20:15 0.42 PERF P POST RU AND PRESSURE TEST LUBRICATOR TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES Printed 10/28/2014 9:59:05AM North America-ALASKA-BP Page 7 of 7 Operation Summary Report Common Well Name:G-15 AFE No Event Type:COM-ONSHORE(CON) Start Date:10/16/2014 End Date.10/19/2014 X3015RH-C:(1,444,118.00) Project Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 1 I Spud DateRme:10/15/1981 12:00:00AM •Rig Release:10/20/2014 Rig Contractor.NORDIC CALISTA UWI:500292064700 Active datum:G-15(§)75.63usft(above Mean Sea Level) Date From-To I Hrs Task Code NPT I NPT Depth Phase Description of Operations (hr) (usft) 20:15 - 22:45 2.50 PERF P POST INSTALL TWC WITH NO ISSUES. PUMP OUT REMAINING DIESEL FROM TWC TO TREE AND FILL WILL McOH. CLOSE TREE VALVES 22:45 - 23.30 0.75 PERF P POST STAB ON INJECTOR AND BLOW DOWN COIL WSL REMOVE LOTO FROM G-16 AND G-19 WELLS 23:30 - 00:00 0.50 BOPSUR P POST BARRIERS VERIFIED PRIOR TO RAM CAVITY INSPECTION:(LEAK TIGHT ISOLATION ON SWAB VALVE TO 3000 PSI. NO FLOW CONFIRMED ACROSS MASTER/SSV). LOTO ACCUMULATOR. INSPECT RAMS. 10/20/2014 00:00 - 02:30 2.50 RIGD P POST CHANGE OUT 1"COMBIS TO 2-3/8"COMBIS. 02:30 - 04:15 1.75 RIGD P POST 'ND BOP. 04:15 - 06:00 1.75 RIGD P POST I INSTALL TREE CAP AND PRESSURE TEST TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES. "'RELEASE RIG AT 0600 HOURS"' Printed 10/28/2014 9:59:05AM • by North America - ALASKA - BP Prudhoe Bay PB G Pad G-15 - Slot 15 500292064700 G-15C Design: G-15C Survey Report - Geographic 11 November, 2014 r' 1 BAKER HUGHES ��� 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-15-Slot 15 Project: Prudhoe Bay TVD Reference: G-15 @ 75.63usft Site: PB G Pad MD Reference: G-15 @ 75.63usft Well: G-15 North Reference: True Wellbore: G-15C Survey Calculation Method: Minimum Curvature Design: G-15C Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB G Pad,TR-11-13 Site Position: Northing: 5,966,832.87 usft Latitude: 70°18'58.211 N From: Map Easting: 656,301.39 usft Longitude: 148°43'59.01 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.19 ° Well G-15 API No. 500292064700 Well Position +N/-S 0.00 usft Northing: 5,968,324.00 usft Latitude: 70°19'12.682 N +E/-W 0.00 usft Easting: 657,239.00 usft Longitude: 148°43'30.75 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 40.29 usft Wellbore G-15C API no. 500292064703 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (0) (nT) BGGM2013 9/1/2014 19.62 81.01 57,625 Design G-15C Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,792.92 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (0) 35.34 0.00 0.00 245.89 Survey Program Date: 11/11/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 9,500.00 1 :Sperry-Sun BOSS gyro multi(G-15) BOSS-GYRO Sperry-Sun BOSS gyro multishot 9,524.00 9,792.92 MWD(G-15B) MWD MWD-Standard 9,811.00 9,844.31 Inc+Trend(G-15C) INC+TREND Inclinometer+known azi trend 9,874.35 11,846.65 MWD(G-15C) MWD MWD-Standard 11/11/2014 2:41:45PM Page 2 COMPASS 5000.1 Build 61 • 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-15-Slot 15 Project: Prudhoe Bay TVD Reference: G-15 @ 75.63usft Site: PB G Pad MD Reference: G-15 @ 75.63usft Well: G-15 North Reference: True Wellbore: G-15C Survey Calculation Method: Minimum Curvature Design: G-15C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-5 +EI-W Northing Easting (usft) (°) (0) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,792.92 33.33 263.05 8,752.77 -399.01 -3,405.03 5,967,853.78 653,843.32 70°19'8.750 N 148°45'10.11 W TIP 9,811.00 34.58 267.45 8,767.77 -399.84 -3,415.09 5,967,852.74 653,833.28 70°19'8.742 N 148°45'10.40 W KOP 9,844.31 38.05 259.56 8,794.62 -402.13 -3,434.64 5,967,850.04 653,813.78 70°19'8.719 N 148°45'10.97 W Interpolated Azimuth 9,874.35 43.12 253.65 8,817.44 -406.70 -3,453.62 5,967,845.08 653,794.91 70°19'8.674 N 148°45'11.53 W 9,904.33 47.93 245.45 8,838.45 -414.22 -3,473.60 5,967,837.14 653,775.09 70°19'8.600 N 148°45'12.11 W 9,941.79 50.39 231.97 8,863.01 -428.93 -3,497.68 5,967,821.93 653,751.32 70°19'8.455 N 148°45'12.81 W 9,974.40 50.69 220.22 8,883.78 -446.33 -3,515.76 5,967,804.15 653,733.62 70°19'8.284 N 148°45'13.34 W 10,004.40 54.09 210.90 8,902.11 -465.65 -3,529.51 5,967,784.55 653,720.27 70°19'8.094 N 148°45'13.74 W 10,034.49 55.72 200.79 8,919.44 -487.77 -3,540.20 5,967,762.21 653,710.05 70°19'7.876 N 148°45'14.05 W 10,065.66 58.52 191.45 8,936.39 -512.88 -3,547.42 5,967,736.96 653,703.35 70°19'7.629 N 148°45'14.26 W 10,094.69 62.03 181.13 8,950.81 -537.89 -3,550.14 5,967,711.90 653,701.16 70°19'7.383 N 148°45'14.34 W 10,124.61 66.41 173.05 8,963.84 -564.76 -3,548.74 5,967,685.07 653,703.12 70°19'7.119 N 148°45'14.30 W 10,155.93 69.36 167.22 8,975.63 -593.32 -3,543.76 5,967,656.62 653,708.70 70°19'6.838 N 148°45'14.15 W 10,184.69 71.73 158.11 8,985.23 -619.17 -3,535.67 5,967,630.95 653,717.33 70°19'6.584 N 148°45'13.92 W 10,214.88 73.71 154.79 8,994.20 -645.59 -3,524.15 5,967,604.78 653,729.40 70°19'6.324 N 148°45'13.58 W 10,244.42 73.30 152.78 9,002.59 -671.00 -3,511.64 5,967,579.64 653,742.44 70°19'6.075 N 148°45'13.22 W 10,275.59 74.20 144.29 9,011.32 -696.49 -3,496.04 5,967,554.48 653,758.57 70°19'5.824 N 148°45'12.76 W 10,304.63 75.96 135.55 9,018.82 -717.93 -3,477.98 5,967,533.42 653,777.07 70°19'5.613 N 148°45'12.23 W 10,334.64 75.77 128.38 9,026.15 -737.38 -3,456.36 5,967,514.43 653,799.09 70°19'5.422 N 148°45'11.60 W 10,364.21 76.28 119.78 9,033.31 -753.44 -3,432.62 5,967,498.88 653,823.17 70°19'5.264 N 148°45'10.91 W 10,394.71 78.28 111.96 9,040.03 -766.40 -3,405.87 5,967,486.48 653,850.18 70°19'5.137 N 148°45'10.13 W 10,424.65 82.40 106.62 9,045.06 -776.14 -3,378.02 5,967,477.33 653,878.22 70°19'5.041 N 148°45'9.32 W 10,454.71 86.75 113.03 9,047.90 -786.28 -3,349.89 5,967,467.77 653,906.55 70°19'4.941 N 148°45'8.49 W 10,488.67 92.58 120.37 9,048.10 -801.53 -3,319.59 5,967,453.17 653,937.17 70°19'4.792 N 148°45'7.61 W 10,516.31 95.31 127.29 9,046.20 -816.87 -3,296.70 5,967,438.32 653,960.37 70°19'4.641 N 148°45 6.94 W 10,544.71 96.74 136.90 9,043.21 -835.77 -3,275.77 5,967,419.85 653,981.70 70°19'4.455 N 148°45 6.33 W 10,564.36 94.27 133.77 9,041.32 -849.68 -3,262.02 5,967,406.24 653,995.73 70°19'4.318 N 148°45'5.93 W 10,594.73 93.53 126.42 9,039.26 -869.18 -3,238.86 5,967,387.23 654,019.29 70°19'4.127 N 148°45'5.25 W 10,624.85 92.18 123.32 9,037.76 -886.38 -3,214.18 5,967,370.55 654,044.33 70°19'3.958 N 148°45'4.53 W 10,654.71 92.06 119.09 9,036.65 -901.83 -3,188.66 5,967,355.64 654,070.16 70°19'3.806 N 148°45 3.79 W 10,684.65 90.86 116.23 9,035.89 -915.73 -3,162.15 5,967,342.30 654,096.95 70°19'3.669 N 148°45'3.02 W 10,714.64 89.39 113.71 9,035.82 -928.38 -3,134.97 5,967,330.22 654,124.39 70°19'3.545 N 148°45'2.22 W 10,744.25 90.06 110.50 9,035.96 -939.53 -3,107.54 5,967,319.65 654,152.04 70°19'3.435 N 148°45'1.42 W 10,774.85 89.63 107.05 9,036.05 -949.37 -3,078.57 5,967,310.42 654,181.21 70°19'3.339 N 148°45'0.58 W 10,804.71 86.81 104.91 9,036.97 -957.59 -3,049.89 5,967,302.80 654,210.06 70°19'3.258 N 148°44'59.74 W 10,834.65 89.05 101.46 9,038.06 -964.41 -3,020.76 5,967,296.59 654,239.32 70°19'3.191 N 148°44'58.89 W 10,864.51 91.38 98.38 9,037.94 -969.55 -2,991.35 5,967,292.07 654,268.83 70°19'3.140 N 148°44'58.03 W 10,894.75 91.63 95.70 9,037.15 -973.26 -2,961.35 5,967,288.99 654,298.90 70°19'3.104 N 148°44'57.16 W 10,924.77 91.66 91.98 9,036.29 -975.27 -2,931.42 5,967,287.61 654,328.86 70°19'3.085 N 148°44'56.28 W 10,954.73 91.94 88.61 9,035.35 -975.42 -2,901.48 5,967,288.08 654,358.80 70°19'3.083 N 148°44'55.41 W 10,984.67 91.10 84.91 9,034.55 -973.73 -2,871.60 5,967,290.40 654,388.63 70°19'3.100 N 148°44'54.54 W 11,016.23 90.43 82.48 9,034.13 -970.26 -2,840.24 5,967,294.52 654,419.91 70°19'3.134 N 148°44'53.62 W 11,044.53 90.61 79.11 9,033.87 -965.74 -2,812.31 5,967,299.63 654,447.74 70°19'3.179 N 148°44'52.81 W 11,074.44 90.15 75.93 9,033.67 -959.28 -2,783.11 5,967,306.70 654,476.80 70°19'3.242 N 1480 44'51.95 W 11,105.24 90.18 74.97 9,033.59 -951.54 -2,753.30 5,967,315.06 654,506.44 70°19'3.319 N 148°44'51.09 W 11,134.65 90.98 78.86 9,033.29 -944.88 -2,724.66 5,967,322.32 654,534.93 70°19'3.384 N 148°44'50.25 W 11,164.69 91.08 82.70 9,032.75 -940.07 -2,695.02 5,967,327.75 654,564.46 70°19'3.432 N 148°44'49.38 W 11,194.83 90.52 86.89 9,032.33 -937.34 -2,665.01 5,967,331.11 654,594.40 70°19'3.459 N 148°44'48.51 W 11,224.79 90.31 91.35 9,032.11 -936.88 -2,635.06 5,967,332.20 654,624.33 70°19'3.463 N 1480 44'47.64 W 11,254.76 90.55 95.84 9,031.88 -938.76 -2,605.16 5,967,330.95 654,654.26 70°19'3.445 N 148°44'46.76 W 11,284.87 89.29 98.51 9,031.93 -942.52 -2,575.29 5,967,327.81 654,684.20 70°19'3.408 N 148°44'45.89 W 11,314.93 88.80 103.81 9,032.43 -948.33 -2,545.81 5,967,322.62 654,713.79 70°19'3.351 N 148°44'45.03 W 11/11/2014 2:41:45PM Page 3 COMPASS 5000.1 Build 61 Id" 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-15-Slot 15 Project: Prudhoe Bay TVD Reference: G-15 @ 75.63usft Site: PB G Pad MD Reference: G-15 @ 75.63usft Well: G-15 North Reference: True Wellbore: G-15C Survey Calculation Method: Minimum Curvature Design: G-15C Database: EDM R5K-Alaska PROD-ANCP1 i Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 11,344.77 88.37 103.15 9,033.17 -955.28 -2,516.80 5,967,316.27 654,742.94 70°19'3.283 N 148°44'44.18 W 11,374.91 89.72 100.28 9,033.67 -961.40 -2,487.30 5,967,310.78 654,772.56 70°19'3.222 N 148°44'43.32 W 11,407.41 90.49 95.84 9,033.61 -965.96 -2,455.13 5,967,306.89 654,804.82 70°19'3.178 N 148°44'42.39 W 11,434.90 89.51 91.31 9,033.61 -967.67 -2,427.70 5,967,305.76 654,832.28 70°19'3.161 N 148°44'41.58 W 11,465.04 89.29 87.96 9,033.92 -967.48 -2,397.57 5,967,306.58 654,862.40 70°19'3.163 N 148°44'40.71 W 11,494.41 89.42 84.16 9,034.25 -965.46 -2,368.27 5,967,309.21 654,891.64 70°19'3.183 N 148°44'39.85 W 11,534.63 88.62 79.15 9,034.94 -959.63 -2,328.50 5,967,315.88 654,931.28 70°19'3.240 N 148°44'38.69 W 11,565.67 89.57 74.54 9,035.43 -952.57 -2,298.28 5,967,323.57 654,961.34 70°19'3.310 N 148°44'37.81 W 11,596.92 91.05 71.44 9,035.26 -943.43 -2,268.41 5,967,333.33 654,991.02 70°19'3.400 N 148°44'36.94 W 11,625.75 91.47 69.74 9,034.63 -933.85 -2,241.22 5,967,343.48 655,017.99 70°19'3.494 N 148°44'36.14 W 11,655.86 90.58 65.90 9,034.09 -922.49 -2,213.35 5,967,355.42 655,045.62 70°19'3.606 N 148°44'35.33 W 11,685.97 89.97 70.35 9,033.95 -911.27 -2,185.42 5,967,367.22 655,073.31 70°19'3.716 N 148°44'34.52 W 11,719.43 88.22 74.72 9,034.48 -901.23 -2,153.51 5,967,377.92 655,104.99 70°19'3.815 N 148°44'33.59 W 11,745.71 89.11 78.29 9,035.09 -895.10 -2,127.97 5,967,384.58 655,130.40 70°19'3.876 N 148°44'32.84 W 11,778.73 89.85 83.35 9,035.39 -889.84 -2,095.38 5,967,390.53 655,162.87 70°19'3.927 N 148°44'31.89 W 11,805.47 89.20 86.71 9,035.61 -887.52 -2,068.75 5,967,393.40 655,189.44 70°19'3.950 N 148°44'31.11 W 11,836.09 90.00 90.90 9,035.82 -886.88 -2,038.14 5,967,394.68 655,220.03 70°19'3.957 N 148°44'30.22 W 11,846.65 89.69 92.26 9,035.85 -887.17 -2,027.59 5,967,394.61 655,230.59 70°19'3.954 N 148°44'29.91 W 11,888.50 89.69 92.26 9,036.08 -888.82 -1,985.77 5,967,393.84 655,272.43 70°19'3.938 N 148°44'28.69 W Projection to TD 11/11/2014 2:41:45PM Page 4 COMPASS 5000.1 Build 61 r rr 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-15-Slot 15 Project: Prudhoe Bay TVD Reference: G-15 @ 75.63usft Site: PB G Pad MD Reference: G-15 @ 75.63usft Well: G-15 North Reference: True Wellbore: G-15C Survey Calculation Method: Minimum Curvature Design: G-15C Database: EDM R5K-Alaska PROD-ANCP1 Targets Target Name -hit/miss target Dip Angle Dip Dir. TVD +N/-S +El-W Northing Easting -Shape (0) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 0-150 T4 0.00 0.00 9,040.63 -944.08 -2,205.42 5,967,334.00 655,054.00 70°19'3.394 N 148°44'35.10 W -actual wellpath misses target center by 23.87usft at 11654.94usft MD(9034.10 TVD,-922.86 N,-2214.19 E) -Point Drilling Polygon 0.00 0.00 0.03 -1,471.27 -968.71 5,966,832.87 656,301.39 70°18'58.211 N 148°43'59.01 W -actual wellpath misses target center by 9111.74usft at 11888.50usft MD(9036.08 TVD,-888.82 N,-1985.77 E) -Polygon Point 1 0.03 695.54 -2,301.49 5,967,480.00 653,986.00 Point 2 0.03 683.73 -1,737.57 5,967,480.00 654,550.00 Point 3 0.03 645.14 -1,328.26 5,967,450.00 654,960.00 Point4 0.03 820.58 -153.25 5,967,650.00 656,131.00 Point 5 0.03 702.86 -72.69 5,967,534.00 656,214.00 Point 6 0.03 652.29 -475.86 5,967,475.00 655,812.00 Point? 0.03 401.92 -1,607.44 5,967,201.00 654,686.00 Point 8 0.03 357.77 -2,221.54 5,967,144.00 654,073.00 Point 9 0.03 695.54 -2,301.49 5,967,480.00 653,986.00 G-15C T1 0.00 0.00 9,047.63 -788.12 -3,394.50 5,967,465.00 653,862.00 70°19'4.923 N 148°45'9.80 W -actual wellpath misses target center by 16.97usft at 10413.65usft MD(9043.46 TVD,-772.85 N,-3388.40 E) -Point G-15C T3 0.00 0.00 9,040.63 -935.30 -2,958.45 5,967,327.00 654,301.00 70°19'3.477 N 148°44'57.07 W -actual wellpath misses target center by 38.22usft at 10892.88usft MD(9037.20 TVD,-973.07 N,-2963.21 E) -Point G-150 T2 0.00 0.00 9,039.63 -835.44 -3,284.46 5,967,420.00 653,973.00 70°19'4.458 N 148°45'6.58 W -actual wellpath misses target center by 7.39usft at 10538.45usft MD(9043.93 TVD,-831.31 N,-3280.10 E) -Point G-15C T5 0.00 0.00 9,035.63 -831.17 -1,721.91 5,967,457.00 655,535.00 70°19'4.505 N 148°44'20.99 W -actual wellpath misses target center by 270.08usft at 11888.50usft MD(9036.08 TVD,-888.82 N,-1985.77 E) -Point Formations Measured Vertical Dip Depth Depth Dip Direction (usft) (usft) Name Lithology (°) (1 9,817.00 8,772.69 IVISHAK(SADLEROCHIT SAND(MED),CHERTY 9,875.00 8,817.91 IVISHAK(SADLEROCHIT SANDSTONE,MEDIUM 10,050.00 8,928.03 IVISHAK(SADLEROCHIT SAND,FINE 10,300.00 9,017.68 IVISHAK(SADLEROCHIT SANDSTONE Design Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (usft) (usft) (usft) (usft) Comment 9,792.92 8,752.77 -399.01 -3,405.03 TIP 9,811.00 8,767.77 -399.84 -3,415.09 KOP 9,844.31 8,794.62 -402.13 -3,434.64 Interpolated Azimuth 11,888.50 9,036.08 -888.82 -1,985.77 Projection to TD Checked By: Approved By: Date: 11/11/2014 2:41:45PM Page 5 COMPASS 5000.1 Build 61 N O L N En a) c N 07 _ aw i a. J a 'c m O O n n n 2 O E E C N F W O• O U r 0. W 0 p 7 ,_ C a O < E (a a o o 0 co H c a o N c' 6 < W W O t p r) a) m O W U U U 0 O -J X O O X O mN a _ o N E E Q °° °° Q CO (• N a N U) u) 1. 2 c� o o c� o n N s. d w N ^ O O h O O o o O V a p I N u7 ,- c0 O m O .. 3 0 O O O- N p a) (a o v co CO Z °' w E 'aiN 2 N a) E � C a) • x N X ^ al E - F U CO �. O ❑ W a= O p)N E O O U c o d .. 2 O o c a) o a: O' 7 t ❑ Z cn ui Fo y a w o E 0 - a) n (L co 2 c o re U) Q X • H .� CL > o a) p„ a) OQ! O L + C co a' U) a' E O�1 a3 LL N a) 0) o ^ O a) a) °.... E .` n U 0- 0 o U ( J OO a a_ in E Q V N >- H O V H N N r R O N O O L a)N 7 , °) p a El 2 E E• c N a a ao _ pU N U) a m CO a) > ) . aco Y Y J E O U.) a W ce CO O O a N u)• > cn III mN. n ar 3 cu x c0) 0 En o c E E Q co g c o M CO o ° 0 w w w > > F U U ~ v (6 > - N O a y • 'O 'C R m 3 .c LL G) � CO CO O. LL u1 O E E3 m a n E o •Eo r-N _ o Q d v t7 .v Q v 0 a t V ,_ up m 0- a) 9 n -c6 a a v O V _U r- -oo Y o (i Z ❑ © -6 w o a N (D u) CO (1) a) 0I 4O CO Z u! CO 0) al --=... p 0 .0 _0 d p a) 5 N -0 0c, o u) o) 0 p Z E (n U N co up O ° LL 0 a) N g a) p) 0 O N O) O - Y .. m (a E -0 E c a O ca a) a) LL = Z > 0 co N a) m U in co a < o oi u) C co 6 a) n O ai E 0 O ~ op H 20 ' Z U. a) > > . c, w C7 2 3 a) N c m Q Z (/) Y o U • H D O co 0 O co 0 0 a) o (L a o . ix 3 E Z (an- Q U m ° - a w O 2 2 w c Wd Et Z o CO W J Z - a) o u) Z W o W O 2 N N o o' v Z m H w - .0 o ° o O g U > H > ' v m a U O O O z c") J O 2 W Q o w a �_ N O Cl) U re z w w a. co. No O v - = J U) a 4. ,_ U a - u) O a) O O N A Z U O E W (v) �. co _se Z = E (L O N O U ° o C E m p > ,a °' W Z a) 2 a' v a c o) E U 0 0 0 o CO I. I- T) "0 U Z N a) a) p) 6 c7 • ` a mad m• a > o o U o m m E n E LEP a On c c 0 m o >. hO O- m o -• V .2 N C a) a) dZ F > >. o u) H (� LO O M U-0 ao ° > o ,p E E o-m m .( 75 Z p Pi. Y a`) -° uR (o m om > aO t O .) O oomo H U a w U > a) d> 0 0 o d > rna_ cc a u. n a. 0 2 0 0 o ❑ • t.CNI j } $ ) [ / < — rn j\ k I _\ $ 4co ) / 72 & �{ \ / - 0 f 3 z z \ _ (3 * / CO - — _ r = 1 $ J o ) / o + % .. 1 0. 12 \ \ } \ U a m < x - . . {) ) t' E E - z z ; « ra () f z J — _ 0- .42 )�4 \ 2CO T \ — 0 � ) \ « ) § \ w J 3 = - \ / ® t / < 12)c E / / SI 2 3 ) ( ) 0 J \ . + \ 2 3 $ \ 2 ƒ % ) e act — c t / | f q ) 3 e = \ to to cu a ) } / \ E « � — 2 o r % e - E . e » ( f ; 5 $ E E : m 3 f 3 m ) a e 3 < e a § 3 o = \ ( « y o . 0 ) « o f R a � ct ¥ o , = E % // -. § l \k \ DO e § = \ 0 ) / . 1 k z \ f a ] J # ° u) . . . Tii (Hf = - ® 0, k E a a ƒ 34 .0 ( ¥ I t •— � � � } } \ ) /E < 6 -0 3 � & - 7 on \ /\ , y « z - 2 - \ 0 0 > z - z z CD < \ § / & 12 . 0 O i < ( # _ « z 0 § Cl) G J s \ �zz § ew » 7 2 \ \�) \ j } \ § \ \ = CO + \ v 0 ..)— . n § ] ) 0U) k E i k : F \ * e 2 & § ° ± ± G = \ ` / \ 3 ) « ] R a a f e�\\I%%�� THE STATE 1 cT::a ,IT: a_,c, C2 - c ." ,A,A O A >l\ / A i j _ -,_-_,-d.„,_:<, ' L; 1—.2_�z. .)_..L' -� 1, i -_ _ — 333 West Seve�`�to Av,,',ue 1'y"!:-" , GOVERNOR SEAN PARNl,I.L Ar,cn orage, Alaska 99501-35=2 -„ 7.: �ii Main: 907 279 1433 0x1 xi ,t, John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU G-15C BP Exploration (Alaska), Inc. Permit No: 214-126 Surface Location: 3304' FNL, 3004' FEL, SEC. 12, T11N, R13E, UM Bottomhole Location: 4132' FNL, 559' FWL, SEC. 12, T11N, R13E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, e)/1--- , Daniel T. Seamount, Jr. Commissioner DATED this day of August, 2014. ts STATE OF ALASKA �` „ .. .„. r""" + ALP )IL AND GAS CONSERVATION COME DN '\Iii 1 t 2014 PERMIT TO DRILL 20 AAC 25.005 ,,-'h(')X iCC 1a Type of work. 1b.Proposed Well Class:a Development Oil 0 Service-Winj •®Single Zone 1c.Specify if well is proposed for: 0 Drill 0 Lateral 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone ❑Coalbed Gas 0 Gas Hydrates • ®Redrill 0 Reentry 0 Exploratory 0 Service-WAG 0 Service-Disp 0 Geothermal 0 Shale Gas 2.Operator Name. 5.Bond •IS Blanket 0 Single Well 11.Well Name and Number: BP Exploration (Alaska) Inc. Bond No 6194193 • PBU G-15C • 3. Address 6.Proposed Depth: 12.Field/Pool(s) P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 12200' • TVD 8962'ss . Prudhoe Bay/Prudhoe Bay 4a.Location of Well(Governmental Section): 7.Property Designation(Lease Number). Surface: ADL 028280 • 3304' FNL, 3004' FEL, Sec. 12,T11N, R13E, UM • Top of Productive Horizon: 8.Land Use Permit: 13.Approximate Spud Date: 3557' FNL, 1384'FEL, Sec. 11,T11N, R13E, UM October 1,2014 Total Depth 9.Acres in Property. 14 Distance to Nearest Property' 4132'FNL,559'FWL, Sec. 12,T11N, R13E, UM 2560 17200' 4b. Location of Well(State Base Plane Coordinates-NAD 27)• 10.KB Elevation above MSL 75.63' • feet 15.Distance to Nearest Well Open Surface: x 657239• y-5968324• Zone- ASP4 GL Elevation above MSL: 40.29' • feet to Same Pool: 132' 16.Deviated Wells: Kickoff Depth: 9815 feet 17 Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle. 99 degrees Downhole 3258 V Surface. 2378 18. Casing Program Specifications Top-Setting Depth-Bottom Quantity of Cement,c f.or sacks Hole Casing Weight ` Grade Coupling Length MD TVD MD TVD (including stage data) 3-1/4" 2-3/8" 4.7# L-80 TH511 2900' 9300' 8230'ss 12200' 8962'ss 58 sx Class'G' 19 PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations)_ Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth TVD(ft). Junk(measured) 12205' 9047' 11500' 11990' 9032' None Casing Length Size Cement Volume MD TVD Conductor/Structural _ 80' 20"x 30" 8 cu yds Concrete 1 35'- 115' 35'- 115' Surface 2635' s 13-3/8" 3490 cu ft Permafrost II 37'-2672' 37'-2672' Intermediate 9362' 9-5/8" 1279 cu ft Permafrost, 130 cu ft Permafrost'C' 34'-9396' 34'-8397' Production _ Liner 628' 7" 432 cu ft Class'G' 8900'-9528' 7935'-8522' Liner 3228' 3-1/2"x 3-3/16'x 2-7/8" 230 cu ft Class'G' 8873'- 12101' 7910'-9032' Perforation Depth MD(ft). 10520'- 11985' Perforation Depth ND(ft): 9048'-9032' 20.Attachments: 0 Property Plat IS BOP Sketch 0 Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis 0 Diverter Sketch El Seabed Report 0 Drilling Fluid Program 0 20 AAC 25.050 Requirements 21 Verbal Approval. Commission Representative: Date 22. I hereby certify that the foregoing is true and correct: Contact J Kyle Raese,564-4629 Printed Name Email John.Raese@bp.com John McMullen Title Engineering Team Leader 9 9 Signature/1'/'v1.-/e /titnra05j i42 f(m, Phone 5644711 Date 8-/y'/4/ Commission Use Only Permit To Drill „,„ API Number: Permit oval ate: See cover letter for Number I Y� i 50-029-20647-03-00 a�l 1 other requirements Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coal ed methane,gas hydrates,or gas Er contained shales: �No / Other. 30 p 7,--e,„f 1 3 500 it, 5 , Samples Req'd ❑Yes No Mud Log Req'd. 0.,Yes [� H2S Measures: [2Yes 0 No Directional Survey Req'd. L"J Yes 0 No Spacing exception req'd: ❑Yes [ /No inclination-only svy Req'd: 0 Yes 1;1/No APPROVED BYQ7----... "--..7 APPROVED BY Q� ��'l COMMISSIONER THE COMMISSION Date U / PI- Form 10-401 Revised 10/2012 This p t s i r DAL sm the date of approval(20 AAC 25.005 ,,.,SubmitSuForm and Attachments In Duplicate VLF 8/24/i. 43) TZe-'- i'( 1 •- To: Alaska Oil &Gas Conservation Commission From: J. Kyle Raese CTD Engineer 0 bp Date: August 14, 2014 Re: G-15C Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack lateral from well G-15B by the Nordic 1 Coiled Tubing Drilling rig on or around October 1, 2014. The G-15C sidetrack will exit through the existing 3-3/16" liner and kick off in Zone 2C and target Zone 1B reserves. The proposed sidetrack is a -2,385' horizontal Ivishak / Zone 1B producer, which will access a -30 acre reserves target southeast of G-15B on G-pad. The lateral will be completed with a 2-3/8" L-80 liner which will be cemented outside the window and perforated. Rig Work(scheduled to begin October 1, 2014) % 1. MIRU and test BOPE 250 psi low and 3,500 psi high. (MASP 2378 psi) 2. Pull TWC and bullhead kill well (only if MIT-T fails). 3. Mill 2.74"window and 10' of rathole. 4. Drill build: 3.25" OH, 790' (25 deg DLS planned). 5. Drill lateral: 3.25" OH, 1595' (12 deg DLS planned). 6. Run 2-3/8" L-80 liner leaving TOL at-9300' MD. 7. Pump primary cement job: 12 bbls, 15.8 ppg, TOC at-10,130' MD (outside window). T✓1 i5 8. Perform liner cleanout and RPM/GR/CCL log. P TO 9. Perform liner lap/injectivity test. 10. Perforate liner based on log interpretation (-1000'). 11. Freeze protect well to 2,500' MD. 12. Set TWC; RDMO. Post-Rig Work 1. 0 Re-install wellhouse, flow line and pull TWC 2. S Set 35 KB liner top packer* 3. S Set GLVs 4. 0 Test separator *Approved alternate plug placement if liner lap test fails per 20 AAC 25.112(i) Mud Program: • Well kill: 8.4 ppg brine (586 psi over-balance) • Milling/drilling: 9.5 ppg PowerPro for milling window and drilling (1089 psi over-balance). Disposal: • All Class I & II non-hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >11 must go to GNI. Hole Size: • 3.25" from 9,835' MD to 12,200' MD Liner Program: • 2-3/8", 4.7 lb/ft, L-80, TH 511 liner with cementralizers 9,300' MD - 12,200' MD • A minimum of 12 bbls of 15.8 ppg cement will be used for liner cementing (TOC 10,130' MD). • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional: • See attached directional plan. Maximum planned hole angle is 91°, inclination at kick off point is 35°. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property— 17,200'. • Distance to nearest well within pool— 132'. Logging: • MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section. • Cased hole GR/CCL/RPM logs will be run. Perforating: • 1.56" 1606 PJ HMX, 6 spf perf guns, 1" CSH work string &2-1/16" CSH. • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti-Collision Failures: • G-10 Center to center: 210' —Abandoned • G-10B Center to center: 617' —Abandoned • G-15B Parent well at KOP • G-16 Center to center: 593' —Abandoned • G-16A Center to center: 172' — Producer to be shut-in • G-19B Center to center: 441'— Producer to be shut-in Hazards: • G Pad is not considered an H2S pad. • G-15B had 20 ppm H2S on 1/25/2014. • The lost circulation risk for G-15C is considered to be low with two planned fault crossings. Reservoir Pressure: • The reservoir pressure on G-15C is expected to be 3,258 psi at 8,800' TVDss (7.12 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,378 psi. • An EMW of 8.4 ppg for this well will provide 586 psi over-balance to the reservoir. J. Kyle Raese CC: Well File CTD Engineer Joseph Lastufka E wow: 10, `u. Q= Z 0 m Q O a) Q � co • Q a a ca U ' o ..+ O N C 71 ta � U C7 ' Z a a t� C� a M 4 ■ . . . . . . . \ "kw 0- NII, z z « : co - 03 _ _ Z Co ' \ 7 .1- 2 0 0 < \ I cu { \ \ •2a 2 } \ . m ± G R < - , ma 0 / f2 _ \ § \ j [ » / § \ - » § EE ' § ) \ / § E ; 44 ! ] R § _]k ] ACO J] 2 2 15) k \ � � B2 = ) , .73 - \ .- p2T , .a \ a a ■•• a )04W � � l ! ®o22] x § 220 ° , a - 7 LO- ` CO- CO o® \ � 07 re _ < - / a CO / i j 3 9Em co . k a ) A 9 £ ° % J77 / z uj 3 k § - k zw s - 9Ee a ƒ � 2 i z NI[ • ) a .. E § - \ -0 , . E . £ 20_ § 6 ) \ e j \\ } j \ DOD Q 2 (No - - ° ; ao j 7 . 0 $ 0 0 \ CO ) � \ / ° ( - - \ _ 2 a mow « 0- o o o 2 ) / _ ƒ f � 2 k .0 0 0 m < 2 f 9 "0 Daae = mak § ƒ 0_ 646 { f ƒ § ! La.2 ivi ID co k6 2 = : / ! ■ . ! . - a ` ` 0z .. 2ii = � 7 i CC § � , a § \ = 2 in: / ( .13) :h• ( ua. a ¢ 3a a. 20 ■ in inu. a. I I a # z aJa a ` OE \ • . M 0 In O 0 0 U) C 0 N (0 O 0 W CO M 0 O m O N m O N r!) O C a 1. Z N C M U) U) M O r- O m 0) O C VIW0 m m m 1" Y ") 9) n U) rn 00 a, m m ilium�i (a o m HF o z CO .. 0) a u) co O 0 CO N- CO 0 C (0 N N Oa O U r` ,- O) O 0) NN m N W m m N Z 0M CO I N M M m N N- (N U N N N N N N CO CO M M N N Q ( hM (o ( ( co- ro- e g . ) ? � I I O V1• 7 O > a a a O > 2 N a) N- C C CD 0 0 0 0 0 0 0 0 0 0 COMO Z Q N N O O O O O O O O O 0 CO111 m N U) U) u)0) U) u) U) u) u) u) u) u) U) u) 0 Y ,- N N N N N N N N N N U a) a w 3 'g a 0 O 2 6 F 2 w N C 3- 0.1 N. N N. C m CO 0 m m N CO C O C O u) m N 0) CO O 0) m O MO) 0) r- o) C a) N6 CO mai O d C M CO ,- N- N. 3- N- N. N m C U .i O7 m mm m N- N- N- c0 (0 (0 N- N- C CO G O G M M M M M M M CO- M M M M M M • L 1 . �-" U) U) N u) u) U) U) u) t0 U) LO U) U) U) w a) y s, (0 CO CD CO CO CO CO CO CO m CO CO CO CD a) r210 -- ar 2i ll W O al 7 a) A LN. c is L) v aciCO G V = n CO m m m N n rn N (+O] O M 4U) N dw N a M M N U 0 CO Tai CO O) - m O w y al U N E O C u) U) u) U) C C 0) CO N CO M h u) U m T m rn m m m m m m m m u) v v To K at a 0) E x r; N- r; r- N- r` N- N N- r` N- N N- IN- CA CD CD CD CD CD OD CO CD CD CD CD CO CO J F 2 2 N G O 2 Y N O — U) u) In Ln U) U) U) U) u) u1 Ln Ln N U) coco 0 + '0 2 G jC C .2 w o Iii (2 n E0) CD- 1 M N CO N. M 0 UCO CO u) N C N N Cl) V r O C O O CO CO 0) U) 3- CO M N 3- 0) O U) (0 SN a) U) m r CO U) N O) m CO m m CO O_> U 0 0 N N- CO r N- n M co m 0) 0 (n 2 2 C C v v_ v_ V Ln u) U) Ln (n U) v v a C to NI M M M M (�) M (7 M M M M (7- M m m w I- O 0 Cl. CO CO m n V' C C m CO CO 0) C CO m O O C m C N- O CO M m N- m U) Ln M (`J 0) CO T O 0) M m m N O C C a Z 0) m 0) 0 0 u) N N- N N- 0) a) E ....LX W C) CO M C C V V U) ID CO N- N- N- N- N 2 a + O 2 3 I2 m • C M u) ,- 0) C 3- 3- CO N U) • 0 C r- CO 0) M 0) 0) N N C N M IN CO u) 0 N N CO CO IN C U) r` m r- m 0) (f) CO N IN 0) 0 M M U) (O 1 (O m CO n N- N- CO m m 0) 0) 0) 0) W CO _ co- m m m m m m m m m m m m m CI CO F E O T O) U) CO m N CO m CO M CO N m 0 M 0 CO 0 0 O CO CO N T 0 CO 0 N 0 CO N- U) U) U) M C m (O O O O M OC M m4 Q m m m m 1.11 (n N W m ! 3- 1- 1- 0 O CC' 0 0 N N N N N N N a C (p (p 'N a) rn m C C Q ...� 3 m m N T U '- a a o o C.3 O U) U) (n 7 M 0 m m (0 U) 0) CO U) N Vl (7 (7 M CO CO CO CO CO CO m O CO u) N CO CO C CO m 0) c') C N M CO CO r- W Q O 0NI O O CO CO CO M C C U) CO N- N- N- IN N. N- , 00 as O N N O #UN ON. ON C ZUO u _ ma F 7crrn 0 riE O a Q a r v 7 u) u u O 2 m E z a a (7 0 0 a O O N o p p 0) p N O O O O O O O O O O O O O O C N N O O O O O O O O O O O O O O Q O` O N mo T N O u1 U) C) N O O N O O N O N h a N 0 d O) O r co O O O O o 0 0 0 U) �j > r- m m m 0) m 0 N CO M C C M O O` N Q1 41 0 O 20 •^r• CO G. O Ol a 0) 0) 0) O O O O O O O O M 7.3 .. F LL a a 7 F Y co a Ln m r` tl 0 m o c a a) o m m c o C N oo a` in33a m a m WI O O O 0 CO V O v 0 O 0 O 0 0) O O 0 O C) CD . UI 0 O O 0 CO (0 0 C) 0 0 0 0 0 0) 0 0 0 0 0 a Mpg0 O O N M M 0) CO O O O O O O) O O O O O) '' moue N N N co 00 O) 0) CI CI co co 0) 0) co CA 00 m Mo a 0 CZ W IL :.. pO CB I- U) 0) (/) co N CO CO CO CO CO V C) V 0 V O CO I. CO V C) N N- a_ 0 N M I. M N O CO V' a- IN 0 V 0 I. CO I. O U M CO M V W4 CO ,- (O V' CO V O CO co O Z O I. 7 co I. N- CO O CO 0 CO R CO O CO CO CO N C) O O D) rn C) CO co I. N- (O CD V) 0 4 7 CO N N Q N gCh c7 C7 N N N N N N N N N N N N N N N N o co al 7 O > `. cc Lo u a f 7 Y N p j C) O (p 0 O O C) O O 0 0 O O O O 0 0 0 0 0 0 0 � O M Z Q 0 O O C) O O O O O O O O O O O O O O O J CO O CO CO CO N CO (0 N N N N N N N N N N N N N CO 0 ) N N N N N N a-- .- a- a- ,- .- o- •- `[7 r-' 0 i inana\\ E l0 C V E ty m O N N 7 C a ❑ O 20 H2 uJ CO N 0 0 V CD CO CO 0) M CD r 0) CO CO C) CO 4- co M N V C) 0) CO O) CO O CO 0) CO I. I. CO M CO 0) 0 I. N I. N CD r) N- O 0 0) (O co V CO co .- N- N. CO CO R CO 7 CO C) CO M co co CO CO M U .i O CO co co C) 0) C) O .- ,- N N N CO V V CO co co I. C O C M M M M M M V 4- V V R R V V V C 4- V a) L - ✓K CO CO CO CO CO CO CO CO co CO N co CO CO CO CO CO CO CO d d y 7 CO CO CO CO CO CO CO CD CO CD (.0 CO CO CD CO CO CO CO CO w 2 til — a' C N CI 'O c uiD A )p :7,' C07 y 7 CO M CO (O O N- CO N- 0) I. (O N N N C V (D O f. 1. N O) O N. O 0) 0 (O 0 W CO .- N V 4 N Cd A rI N. D) O) I. V CO N CO CO N rl a0 CO CO M O y d C) N CO co N- CO CO CO M N O O O N C� Cy 15 a' )+ N C) ' V V '0 V 7 co co co co coco co co 0 M M M M (O.1 ❑❑> (.S .E L H CO CO CO CO) 0) CO CO CD 0) CO Co)_ 0) CO CO)_ CO Co)_ Co) 0 CO 0) J f'- s 2 (n ❑ 0 - CO (n (n v) (n u) CO CO (n (n u) (n CO CO CO CO CO CO CO 0 0. 0) V V N O N r N V 0_ V O O O N V N CO CU CO M (D CO (O N CO CO 0) CO CD 0) 0 O CO N I. O M 0) CO C) 0O CO O 0) CO 0) N- M CD M CO O CO 0) N- M CO N- CO 0) O CO 0) N 0) N 0) 0) N 0) co co M N N N O O 0 O O OD I. N- (D CO 0 Ma C M CI- CO M CO- CO- Ni CO- CO- NI N N N N N N N N N W . in al I- 0 0 CL O CO O co O .- C) V N O 0) 0 CD O N- CO N CO mC- N N f. CO N CO V N N r- CO M V. (D C) V C) 6V 6CC OCD; CO O N 0 O .- M N CO I. C) O co M V r C) 0 N M V an CO CO CO CO CO C a N CO CO CO CO CO CO CO 0) CD C) CD 0) CD CD O) 0) CD C) C In H 2 2 CO O CO N CO CD C CO C) N CO CO N- 0 M V IN 0 N V 7 7 0 0 N CO (D I. N- I. N- CO CO CO CO OD O) N C) 4- R V C a V 7 V V R V V R V V 7 N- N- CO CO CO CO (0 CO CO CO CO CO CO CO CO CO CO CD CO U) 0) 0) W W co W o) W W CD O C) 0) 0) 0) C) 0) 0) 0) U) O W QD 00 COCO- CO CO- CO- CO CO CD O QD W W lC O lC O 0 o C) V) co C) 0) C) 0) C) a- C) 0) C) C) 0) C) 0) N N N. M CO C) 0) 0) 0) C) (O 0) Of C) C) 0) 0) 0) 7 V v lm O) N CO O N r) CO CO C) Co 6 C) V O 0 0 s- .-o 0) C) 0 0 CD CO CO O) 0) CO I. ,- Q a m 1 co co N- O O .- co co co CO CO CO CO CO CO CO CO CO NN 0 co (O m O) CD 0) C) 0) 0) co 0) O) O) co O) V O D) .- O 0) 0) 0) 0) 0) 0) 0) 0) C) 0) D) O) O) C) {Q co C) co C) 0) CO CO CO CO CO CO CO CO CO CO CO CO CO CO C) > * O 0 m -O 0 C o a a r a 0 CO CO CO 0 2 m z a a 0 0 0 O o o CO o o 0 o co o 0 0 co to 0 o o o O o O O Cr O O N O 0 O 0 O M O O O O 0 0 o a Dw CO F. O CO F O co 0O CO O CO 0 N- F O CO O CO O 0 CO Cn d f. O co 0) O o -I O I. 0 N. O M o N- O N. O O N a ` C 0 CO CO CO 0 (0 CO 0 I. I.CO co C) C) 0 O O NCV CO M NI O ❑ O O O O ° O O -0 O O O 0 O O u) C- . ,- M C OC d 4:40) onO . a oC CV -0 mm m0 ,. m 0a co 3 3 ❑ uo 46o• O O O 0 0 N 0 V O V O V 0 uo iii o 0 0 .0 4-) 0 0 o 0 0 0 0 0 0 0 0 0 o a r111og= 6 0 0 0 Co 0 0 0 0 0 0 0 0 0 0 0 .j 10.W b co rn co co co m o) m co rn m 0) 0) CD CO 0) CD 4 Z CO Hto t7 CL V N u) N r u) N- 0 co 0 .- c0 co 0 Z a 0 CO O CO V 0 O CO CO O V 0 u) O t..) 04 O 0 N N rn 0) 0 !V V V O6 N 0) O co o co .- O O coV N u) 1` c0 0 Z O O 0) 0) co 0 t- n t- c0 0 N V V Q i) V N N N N O to u) O > a' a P_, N N p j 7 N C) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N (h Z a 0 0 0 0 CD 0 0 O O O CD 0 0 0 0 0 J U N N N N N NCD N N N N Ni N N N N 0 C V E d O CU N , n C 0 O • 0 i > ww t_. -- N V 0) 0 CO CO V N 0) CO CO CO N- 0 N- N- u) CO N N- CO N 0 u) 0 V N 0 0 O n N n N CO h V t` Oi M co 0) O V ai d u) u) co u) co 1l) co u) N. V N. V CD V CO C) O .0 to N 0 CO 0) 0 O 0 .- .- N N CO CO V v) 0 C 0 CV V V V u) u) u) O. O. N u) u) u] u) 1l) N E L - 1F u) N 0 0 u) u) l0 u) u) N u) u) u) u) 0 N ▪ N 0 (0 CD u) CD CD CD CD CD CD (D CD CO 0 0 0a) O N K W C d p C N V A "p C Vy 0 N- CO CO V u) a) V co N- u) N CI n N C) 0 C V N- N W N 03rn C) r CO 0 CO CD 0 0) • W O .rd. N. 07 () d N V CO cel 0V) co CO (00 (CD 0) 00) .- N R N urn) 0 N Ce T co C co co co co co co C) co co C) C) V V V V V m d r m .o r r r r r CD CD I N-- 0 N- r` N-- co • p (o 0) rn CO 0 0) o) CO 0) rn o) 0) 0) o) o) CO rn J I- 2 2 N 0 Z - (D 0 0 1 ID ui in ID ID (D ID m u) u) u) 0 0_ N co C0 O O co CO u) 0) u) N. N uJ N CO u) W r V N O (D u) O) u) 1` co O CL O co N t- ui N V O 0) V .- W c0 N n O O N0 N .-0 0 0 CO 0 CO CO .- N 0) u) Ni- C) CO N N N O O 0) 0) co o I` N- C C N N N N N N N N N Ni CO W 7 I- 0 0 CL N CO u) N- CD u) 0 N N- CO M 0 V CO (o u) 0 co O co M Cr) N .- N- O N O O O u) 0 O 0 0 CD ✓ CO C) V V V V N 0) CO 0 CD C) N N N Lel CO CO rn 030) O) 0) 0) O) CO CO CO CO CO CO CO C) W 0 Q. 2 2 O V (D u) 0 CO C- u) CO CD 0 0) V 0 CO CO 0) CO CD C- (O u) O 0) u) V O) (O N V V V V V V V V C) C) C) CO N N N N u) CD CD CD 0 CD CD CO CO CD CD CD CD CD CD (D 0) 0) 0) 0) co co a) a) CO CD CD CD CO0 y OD- (/) au co CO COco Co COCOCO 00 co co co CO co 0 w CO 0) 0) 0 0 N 0 0 0 0 0 0 0 0 CO 0 0) 0) CO 0 0 V o O O O O O O O CO O N: of 6 0 N V V N O) 0 e, N 0) CO Oi O N- CO 0) 0) CO CO CO t- 0 t- CO N- CD N- CO 0) 0 11 m 1 co 0 0 o 0 O O O CO CO CO CO r N. N- u) u) rn 03 rn O c") co C) N N N N N N N N N rn m rn o 0 0 0 0 o O O o 0 0 o O Q co 0 co 0) rn CO CO CO CO CO o) 0) rn 0) CO rn CO 0 v Q oa C U w L C a U) U) o o 2 m Z a a 0 0 CD O o O O o N 0 0 0 0 0 0 0 0 N- o 0 Z O O O 0 0 N o O O O O O O O CO O N (>A O O u) O u) D FV o O u) O u) O u) O V FN O N () N 0 0 - 0 N- 0) O O N 0 N O N 0 O) 0 Q, V N u) CD CD u) C) n co co O) 0) 0 0 .- .- C) N C) N N Q 0 _ N N N o CV vC es at'°i a m c v o ' 0 E c .o z m m m m t..) 0. 403 3 p a m • II hto W a LWM m \U M W o 0 .. v) a n. 0 z 0 Q O 0 ce E.' a _ f 3 Y O N )• N co J (( < N N N N E 6 0 O m 2 - ? iE U 1 W iu o .o C 0 ro r `m y m 2 o c y o G y r c ec0 al O c S u u m 7 2 m c o o m N w m G O w w o U H U - °' r w a to J F 2 N D c Y ni d .E TA E U G O a N X Q) m O F O O 0 0 N o CO m as _1 Nm E 0 it; > E d o a O c2 a U H Y M 7 LO co N CO W O N M V LO 0 N. 0 0) 12 d d CJ Q EC") (D N. O CO V N V N N O O N LO CO O 0) N- 0 N Z O M O) .- N O CO (D N 0 O M O C` ,- O) 0 ,- O L) N- co N 0) O O 0) ID in 0) M M (O O) C` O V m N. e O N n C` M M N N N N N CO Sc.,V V V sr ID N V M N O CO N LO M N O OCO N- N CC) C) C) C') (-) C) Ci M C7 C) N N N N N N N N W 7 a) R c 7 0 0 C..) co CO 7 CO 0) O) LO O 0) N O) N. 0 LO N. O N M .- "re O D) 7 O O) In M LO N N CO O) N C` N CO O M ✓ ai W O 0) V V V O (O N6 a0 N. n N u) O CO o co O) O 1-1- N. a) V 0) N LO U) V M ,- CO 0 N J y E (n M 7 1" u' t' ro m m rn rn rn m rn a) rn CD m o0 N CO CL CO N 0 7 M N LO CO O CO N O M O O LO (D 0) CO V O.y O ,- 'Cr N- O) CD V M V O (O n CO CO O) O1 f- O) V CD ti d 7 co- to L N. U) N M Uf1 CO Oi C V C C V V V V (�) M N N 0) W — U g N. CO CD a) M CO (0 (D (D 0 (D CD 0 CO (O CO CO (D (D g ' r d U) co 6 N. U) U) oo co U) oo co co U) U) m U) U) coca co a > o — U >a. it O O m U W m . O N O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 E N CO d 7 y w N '0 0) O O 0 O O O 0 00000000000 0 Q Od N N 7 N .7 N LO N N LO N Lf) LO LO LO N Ln N u) N N Ln IO NO -c 0 lO LO LC) m a — '- = .., C 0) M0 N O LO M O N. N. N. N. N. N. N. N N N O O m N a 0 Co CO O) ,- M V 0 (D N CO O M LO 0 CO W O N Z 0_ 0_ 000 N o 3, O) 0) co co O O O O O O O ,- .- ,- ,- ,- ,- N N u) 2 u 3 ) 0 Q 0 m N 5• 0. °c N v. 0 c n d a _m < •o c) a. rn330 v a 0 W Lea i m= d V 0 * _ 5 0 C vv. i 1- .! Fd a [ LgE u 7. HIV , iggoi F- - 0 ri ° 8 74 g _y u tJ Tc,c! _ - - m N j U'm ,2J - tA a W aR 0 a 5 5 5 A 0 4 t 4 § A § § § g = ro E "~ (u!/Ssn 006(+)41.IoN/(-)glnos F tii 4.6 41 a �g� N 8 = a r 0 M A > It H2f7YNm,m1F - RR8888888888888888888 t s —_ — V h V enr N 4 n 7888888888888888888 u r_e m Vi g4 't8��nG88oyotoy0 nn888V888 A 4 sJn4Au1m�`IR�4�a`f�3mom8m7ol -2' .§E.8 z 4z2w483V4egivnt2,7, wN mm822m8SRM2mmmmmmm�m2 nga 1, Ex .28Mf48g28. 185188M888888 Xii mAAW,Tsm2msmmmssmss is :88888888888888888 �0 1. ;O 0--, mmo r�n- v�nm�m Npool°A$U 9Vn (ut sn SL)tpdaa le0W0A mil II W .115 NZ 71 a= m F x A c Q ylg l /,. i t Va,' E / 6 - ip gsg 'is ScP :600 W O `" N. 00 • N O a ", 11 \ J + .a Sq ‘,- `` \ x, . is ` 4 9'12 p0O9 4 �� '� ... 471 % �p A .600 ‘ :800 144 ;7 0 V 8951 0 .60p A C. ° � <132 M ....6 6 l� - 0 `Op BR. 100 yy oa - - a eau •�pO O04 o ate. o COm e N ,-'Csr,S v ;9q'1 1 8600, C7. T / RRO' — N Q 1946 = \\ 8942-- �. - - � `'' in J — �7 . p z 0 -, (uygsn 00Z)(+)q Ior1J(-)gRo noS ,e.s ueeyy • a > •W 1^ega$�$Ax^xxs"�m� s$ s �0 > � � HgRno m m > m= d : 8 m m 8m88$8$8e8$2 - > ` 4 w ' a 8 ' 4 5F 14 11$$$ Vw $ mmamSgmgm n n m m I I 4 P4888888888888888888 am m $ m m W m i .a%m f a8W.2R3e9R2.88$39W�2,B a m , 22 m m mm - - -_8 Is s Tg= 3pm3%pv7211Awa-giv o " g_66 2 � S ; ; ; ; ;a 5 3 g 3 g g 3 ; ; e w 7 a c w ! / 1 1 1 / / / i r 1 t 1 1 / / 6 a #s84886148XR� 88�Rm8M w 8 14'.2SR w qa 'runs. 'm c ?'c5aa « o$ $ m n<yna�,:mao8�83876:8�8m m N 0 2th6 > ,I d w��"'"88��e3�B2 I2�Oe a g8ip8o a � 888w8RR888888888888 1 . om'8oR EggE '> > mS 4 3 + `> S 4 Pg RM.-,32,922922872,',9,V89 m §88X8 ,7g. a2328, 83 < 5 .12; 05223, 523 _ p ;' gadm'� g ; ddm; ag ; d3dg 1, P`gr ax �� 2WmmmmmWaa8 o w3aaaaaaaaa s a a a a a a y''4 i¢iw 8888888888888 8888888 c� r5 5 c5 c� 5 3 c5 c5 h 5 cA cA 5 eew` ��m w la 3 8 W�� 000000�o�«mmmm r 1 r 1 1 . > / / 1 v , / e 1 e 3 ««<wm�mmo_« .mm�mmR o 11$ 00 00 8 _ 0 0 o< m N oo _00 n 6 E N nc? a � 0� i $ M,,.._„ %. a m «l- m m o _ IILL c `n Z pmIm7 zi £ v c m r0 lIP _ 54-• f0 Jr �I/ �\ % 119 n 0 6L[yln;„1f npr. /////// i >N! - , a! 3 _I _Ip o 8 2 o 0 0 o 0 0 . m 0 0 '0 � I m �' t9•Z -,3 ��-965L1 .� .-� a' 0om _ N m 1 m 0 is h' th 0, s o n u . L aJo'i'.'. 9U.-9 o L u o ).)1 G �� N N s Øbp North America - ALASKA - BP Prudhoe Bay PB G Pad G-15 500292064700 G-15C G-15C Plan#6 Travelling Cylinder Report 13 August, 2014 BAKER HUGHES INTEQ • BP Mil . 0 by Travelling Cylinder Report HUGHES INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-15-Slot 15 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB G Pad MD Reference: G-15 @ 75.63usft Site Error: 0.00 usft North Reference: True Reference Well: G-15 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore G-15C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: G-15C Plan#6 Offset TVD Reference: Offset Datum Reference G-15C Plan#6 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 9,792.92 to 12,200.00usft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,416.47 usft Error Surface: Elliptical Conic Survey Tool Program Date 8/12/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 9,500.00 1 :Sperry-Sun BOSS gyro multi(G-15) BOSS-GYRO Sperry-Sun BOSS gyro multishot 9,524.00 9,792.92 MWD(G-15B) MWD MWD-Standard 9,792.92 10,002.00 G-15C Plan#6(G-15C) INC+TREND Inclinometer+known azi trend 10,002.00 12,200.00 G-15C Plan#6(G-15C) MWD MWD-Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 12,200.00 8,962.18 2-3/8" 2.375 3.000 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB F Pad F-26-F-26A-F-26A 9,980.00 12,343.00 987.78 552.64 445.14 Pass-Major Risk PB G Pad G-10-G-10-G-10 11,529.67 9,975.00 210.84 32.40 210.42 Pass-Minor 1/100 G-10-G-10B-G-10B 12,135.50 10,475.00 617.76 10.34 617.53 Pass-Minor 1/100 G-11-G-11-G-11 10,155.00 10,350.00 1,402.03 585.10 1,205.39 Pass-Major Risk G-11-G-11A-G-11A 10,155.00 10,575.00 599.92 478.36 372.55 Pass-Major Risk G-11-G-11B-0-118 10,300.00 11,050.00 570.51 542.06 114.24 Pass-Major Risk G-14-G-14-G-14 Out of range G-14-G-14A-G-14A Out of range G-14-G-14B-G-14B Out of range G-14-G-14C-G-14C Out of range G-14-G-14CPB1-G-14CPB1 Out of range G-15-G-15-G-15 9,808.56 9,825.00 78.22 19.63 62.33 Pass-Major Risk G-15-G-15A-G-15A 9,809.24 9,825.00 75.69 14.79 64.53 Pass-Major Risk G-15-G-15B-G-15B 9,800.00 9,800.00 0.00 0.26 -0.26 FAIL-NOERRORS G-16-G-16-G-16 11,025.00 9,975.00 593.51 20.67 589.96 Pass-Minor 1/100 G-16-G-16A-G-16A 11,942.25 10,975.00 172.93 8.41 167.98 Pass-Minor 1/100 G-18-G-18B-G-18B Out of range G-18-G-18B-Plan#5x G-18B update kop Out of range G-19-G-19G-19-0-19-G-19 Out of range G-19-G-19A-G-19A Out of range G-19-G-19B-G-19B 10,668.98 13,692.00 441.61 22.20 441.39 Pass-Minor 1/200 G-21-G-21-G-21 12,000.00 10,025.00 904.18 633.83 275.90 Pass-Major Risk G-21-G-21PB1-G-21PB1 12,000.00 10,025.00 904.18 633.63 276.10 Pass-Major Risk 0-27-0-27A-G-27A Out of range CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/13/2014 12:10:36PM Page 2 COMPASS 5000.1 Build 61 TREE= 6"NEEVOY — G WRLI-EAD= I.tEVOY -15B SA NOTES: WELL ANGLE> @ 10259'. ACIT`1ATOR= OTIS ""'OroGNAL&G-15A WELLBORES NOT SHOWN BELOW KB.ELEV= 75.63' WHIPSTOCK*** II ELEV= 41.79 2050' --{5-112"OTIS SSSVN,ID=4.562' KOP_= 3100' Q Max Angle= 96`@ 10564' 2621' H9-5/8"DV RCR Datum MD= 9910' Datum ND= 8800'SS — GAS LFT MANDRELS ST ND TVD DEV TYPE VLV LATCH FORT DATE 13-3/8"CSG,72#,L-80,D=12.347" —I 2672' L 12 2936 2935 6 CAM DOME RK 16 01/03/13 11 5108 4810 39 CAM DMY RK 0 01/04/08 10 6320 5758 39 CAM SO RK 20 01/03/13 9 6471 5875 39 CAM DMY RK 0 04/06/07 8 7140 6408 36 CAM DMY RK 0 12/05/98 7 7284 6525 35 CAM DM' RK 0 12/05/98 6 7689 6863 32 CAM DMY RK 0 12/11/01 --- ----- 5 7839 6991 32 CAM DMY RK 0 12/05/98 Minimum ID =2.30" @ 8883" 4 8235 7334 28 CAM DMY RK 0 12/05/98 BOT OF DEPLOYMENT SLV 3 8370 7455 26 CAM DMY RK 0 12/05/98 2 8518 7588 26 CAM DMY RN 0 12/05/98 1 8668 7724 25 CAM DMY RK 0 12/11/01 ' 8738' —15-1/2"BKR L SLD SLV,D=4.562" I E1/2"TBG, 17#,L-80, .0232 bpf,ID=4.892" H 8803' 8803' H BOT F R TBG SEAL ASSY II 8833' —9-5/8"X 5-1/2'BOT 3-H PKR,ID=4.75" ? —I5-1/2"X 4-1/2"XO,ID=3.958" 8873' —3.70"BTT DEPLOYMENT SLV w/4"GS I PROFLE,13=3.00" 8879' --14-1/20.4"0115 X NP,D=3.813"(BEHIND PIPE) 8883' �LNR PLUG Bt1SHNG PALLED TO 2.30' TOP OF 7"LNR H 8900' . 8892' {3 112"FES X NP,D=2.813" — #11 8922'8922' 4-1/2"OTIS XN NP,MLLE TO 3.80"D 1 4-1/2"TBG, 12.6#,L-80, .0152 bpf,D=3.958" I 8963' v♦• �4 444 441 8963' H4-1/2"WLEG,D=3.958" BEHIND 1 9-5/8"CSG,47#,L-80,13= •8.681" H 9396' 1—, 444 o44. PIPE 44 44, 8964' —ELMO TT LOG 4�4 144. 4 44' �3 1/2"LNR 9.2#,L-80 STL,.0087 bpf,ID=2.992" 9446' 444 1441 9446' —3-1/2"X 3-3/16"XO,D=2.786" 4'4. i4• WHPSTOCK H 9524' 41iX44441 44444 '111 MLLOUT WINDOW (G-15B)9528'-9536' 7"LNR 26#,L-80, .0383 bpf,13=6276" 9524' 4�j44...•.9..4 PERFORATION SUIVIVIARY `4� / 10475' —3-3/16"X 2-7/8"XO,D=2.387" REF LOG:CR/CCL/CNL 05/30/08 4441444444444441 ANGLE AT TOP PERF:94` �6'�����4 @ 10520' / , 11500' ELM -12-7/8"WFD CUP Note: Refer to Production OB for historical pert data (01/27/13) SIZE SIT NTERVAL. Opn/Sqz SHOT SQZ 3-3/1.6"LW,6.2#,L-80 TC1, H 10475' .4i4%p 2" 6 10520-10700 0 05/30/08 .0076 bpf,ID=2.80" , 2 6 10750-10970 0 05/30/08 2" 6 11090- 11200 0 05/30/08 — i��t• 2" 6 11310- 11410 0 05/30/08 PBTD11990' �1`41k, 2" 6 11520- 11650 C 05/30/08 2" 6 11700- 11985 —C 05/30/08 2-7/8"LW,6.16#,L-80 STL,.0058 bpf,D H=2.441" 12101' DATE REV BY COMMENTS DATE REV BY COMMENTS FRIJDHOE BAY UNIT 11/30/81 ORIGINAL COMPLETION 11/13/09 SIWJMD DRLG DRAFT CORRECTIONS WELL: G-15B 08/08/98 CTD SIDETRACK(G-15A) 01/17/13 AJ/JMD GLV C/O(01/03/13) 1 T AT No.' 080650 05/31/08— CTD SIDETRACK(G-15b) 01/31/13 SRB/JMD ADO WFD C1BP(01/27/13) AR No: 50-029-20647-02-00 06/05/08 /TLH CORRECTIONS SEC 12,T11 N,R13E, 1976'FSL&2776'FW.. 06/26/08 DAV/PJC GLV 00(06/12/08) 10/16/08 DTR/PJC GLV 00(09/05/08) BP Exploration(Alaska) _ @ ' NEUJ ♦ S NOTES: WELL ANGLE _D '- -15 ""OrvG,G-15A&G-15B WELLBORES NOT SHOWN ACTUATOR= PROPOSED - BELOW_-- BELOW VVHPSTOCK"' OKB.ELEV= 75.63' I - I BE.ELEV= 41.79 L 2050' H 5-1/2"OTS SSSVN,D=4.562] KOP= 3100' O J Max Angle= @ N. 2621' H 9-5/8"DV PKR - Datum MD= ' CAS LFT MANDRELS Datum TVD= 8800'SS ST MD TVD DEV TYPE VLV LATCH PORT DATE 12 2936 2935 6 CAM DMY RK 0 07/06/14 I-13 3/8"CSG,72#,L-80,D=12.347" H 2672' i 11 5108 4810 39 CAM DMY RK 0 01/04/08 10 6320 5758 39 CAM DMY RK 0 07/06/14 9 6471 5875 39 CAM DMY RK 0 04/06/07 8 7140 6408 36 CAM DMY RK 0 12/05/98 7 7284 6525 35 CAM DMY RK 0 12/05/98 6 7689 6863 32 CAM DMY RK 0 12/11/01 Minimum ID =1.78" @-9310' 5 7839 6991 32 CAM DMY RK 0 12/05/98 WIPER PLUG BUSHING IN DEPLOY SLV 4 8235 7334 28 CAM DMY RK 0 12/05/98 3 8370 7455 26 CAM DMY RK 0 12/05/98 2 8518 7588 26 CAM DMY RK 0 12/05/98 1 8668 7724 25 CAM DMY RK 0 12/11/01 8738' H5-1/2"BKR L SLD SLV,D=4.562" 5-1/2"TBG,17#,L-80, .0232 bpf,ID=4 892" 8803' 8803' -I BOT AER TBG SEAL ASSY ii I 8833' -9-5/8"X 5-1/2"BOT 3-H PKR,ID=4.75" ? H5-1/2"X 4-1/2"XO,ID=3.958" 8873' 3.70"BTT DEPLOYMENT SLV w/4"GS 1 PROFLE,D=3.00" LNR WIPER PLUG BUSHING MLLEO TO?80" H 8883' 1 '' 8879' -H4-1/2"OTIS X NP,D=3.813"(BB1IND PIPE) (__L_ TOP OF 7'LM H 8900' 8892' H3-1/2"HES X NP,D=2.813" 1111 8922' -14-1/2"OTtS XN NP,MLLED TO 3.80"D 4-1/2"TBG, 12.6#,L-80, 0152 bpf,D=3-958" 8963' , 8963' -14-1/2"WLEG,D=3.958" BEHIND 041 PIPE �j 8964' Ham)TT LOG I 9-5/8"CSG,47#,L-80,D li _ =8.681' - 9396' ' 9290' -I35 KB LTP(__/ /_) -9300' 2.70"DEPLOY PENT SLEEVE,13=2.25" VVHPSTOCK 9524' 31/2"LNR 9.2#,L-80 SIL,.0087 bpf,D=2.992" 9446' tri et ''' WPER FLOG BUSI- IG @-9310',D=1.78" ♦ 1r� � 9446' H 3-1/2"X 3-3/16"XO,D=2.786" 7"LNR,26#,L-80,.0383 bpf,13=6.276" --1 9524' 3-3/16"WHIPSTOCK(_/_/__) - -9815' ML LOUT WINDOW (G-15C)-9815'--9825' 3-3/16"LP,6.2#,L-80 TCI, .0076 bpf,ID=2.80' -1 -9815' PERFORATION SOMMARY REF LOG: on / / -1. ^10130' -TOC( /_/_) ANGLE AT TOP POW:*@' ►. • i• 1 Note Refer to Ftoduction DB for historical perf data F . SIZE SPF INTERVAL Opn/Sqz SHOT SQZ ► .11 i i . i -{ --._...- i '.318'LNR, #.L.80 bpi, Il — ...172411?" .i DATE REV BY CO1ifvENTS I DATE REV BY COMMENTS PRIJDHOE BAY UV11/30/81 ORIGINAL COMPLETION I WELL. G-15'' 08/08/98 CTD SIDETRACK(G-15A) 1 FERMI No: 1 05/31108 CTD SIDETRACK(G-15B) AA No. 50-029-20647-0.' _I_I_ CTDSIDETRACK(G-15C) SEC 12,T11N,R13E, 1976'FSL&2776'FWL 07/24/14 JMD BIJLT PROPOSED 07/29/14 DJ/JM) ADDEDVVFER PLUG BUSHING L) BP Exploration(Alaska) a -0 111 r 1- mull m Yy LL 8g 2 S x.N A s OA,i .- 11,1 II 10 I s m 2 � i/ a it) , I I I 1' m s f El tIc 1; i;0 1 '� : ! 9 m i g ��ga .3s Q �a1� g V . i m S 1 o I 4 Q •i i I CI c`i § 1 ,. I N o I II I i = �t111 11 ■ OX11 1iii o lin in Y 1 _\_ i I rt /1 '1 n To ® 1111 a 111 a 2J3 I zm III 111 I 0 I o ,i$ $$ i > Olgi W 1 _ III I11. Q 1d i J V 4 w = 111 U 1 IC I W.! ..-11 N C" K 111 • • V SW it * U 11 N I I • ' J i 1 — E W � v f f . W .. p n IN i 1 = I 10 m X I U I _E1 ...- ig Q Pill €• zCn = Q SU g5 1 C) a` I • re 3 I rc I iN i' Z $ i . ) ; N Mitilleglillig A i II 111 9 1II 1■ 111 a co 1111111111. 1 ^ 11 e I ¢ /O\ 1 111 „olio rc 1 1 1 11=1110 I II �� 1 i OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME: e‘a4;:'- '::c PTD: 2-/L7 i1(c, Development Service _Exploratory Stratigraphic Test Non-Conventional FIELD: /- / r .Clri POOL: ( 7A4Lb-e /,4E} ( Check Box for Appropriate Letter/ Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI LATERAL The permit is for a new wellbore segment of existing well Permit (If last two digits No. , API No. 50- - - in API number are Production should continue to be reported as a function of the original between 60-69) • API number stated above. In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name Pilot Hole ( PH) and API number (50- - - ) from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce / inject is contingent upon issuance of a Spacing Exception conservation order approving a spacing exception. (Company Name) - Operator assumes the liability of any protest to the spacing exception 1 that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where • samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: Production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application,the following well logs are Well Lo ,n also required for this well: gg g Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 4/2014 To N a°) a N co a) E N o @ o Ja N a 5 0 a) Q7 o co U N 41 7 Q a n 0 a a) m o 0 C N 0 aO T O > co a) o a th '� O o xs ti > m `- E w O o ° n ca c 0 a) 2 a -o 2 c E O X co O C w U I° M N a F2O 0) m o cn O c) a o a O .v o o_ .0 cncn T co co.0 n m a Q 0 o a a) m m 3 0 13 nC3w � - a 0 a= 7 OO 0 3O> O > = N aa 3 Ta CO3 mma) ' o c 1.0 N c c co m m O o v O D O O Q E N' a) n 0 C coco 0 Nr03 NO 0 6 c a O (13 Oo a 3 >o ) ° M N a) E m z CO0_ 0 a) -o • >F 0 c o o ' co o p a - (N(N J ai° -a ° co coQ No p o CO00 O w m 1 J LO (. 0 EE a)tz LU N m 0) (O W a- 0 N L w @ O. n N 'cc a O Q o m o o n O c a o O d a - °' E c° - a m E ° _ CC H o m eco 3 @ oCO 3 5 N L DC d 4. �' c ro 5 = o) cc m >, >- c�i v c ti u0i L c 0. 7 a E O 4) a) a) Q 0 a m m Cl) �° N CO co m 3. Q ▪ m 7 3 a) C C c lO a) N- N a a) W d co N CO N m a) O O d CO N 7 E CD N O p E o U U > c co N E N N E - am) 3 a z =° = a a v N CD ° o d E -o o co a) ° a) a) 7 0 c CC O Q 0 7 7 O` O) 12 c m 0_ N d m W d O O U CO (1) d E d Q 2 2 I CD d a LU ° N N N NN co N N N N N N N N N N N N N N N N N N < a) Cl) a) a) a) a) a) a) a) a) a) a) < < < Cl < < < < Cl) a) a) a) a) Q, a) a) a) a) a) Cl) < 0 Cl) Q, Q Q i a Z>- >- >- >- >- >- >- >- >- >- >- >- Z Z Z Z Z Z Z Z >- >- >- >- >- Z } >- >- >- r > Z Z >-, Z Z Z, T F o m Qo N _ m �_ T ° \.. U N o Oct c To a) E 3 - E a) O 0 0 j C N a) C X$ N o_ r O o `) N .5O. ...- _ 3 F T 7 \ / n e w O d HI a) C U 3 0 O O N M C U O 0 C a) Z J c '> co _ a a) m o • ° Cl) E as N O O co N N co Q N) O O E n O a >6 (V 0 Q OU w N C Cl) w c N Ld co _cn o) v o.N °D "=aco c .�Ft, d O 2 00) Ucnm7NCO) -C ? Q O L "O < N N cn a) N 0j Lu - -o o c a 0 a) 2 a m o Cl o c o m o a o o N a N c c o c o' a) =O Q E E = -oo c c ELo @ aa)) o M c c in > F a o ' c•5 Q C m L a N .t a m e U �' CN' Y O O -O 7 _o O N a) c Q 33 O o) 7 0 .a _a n U O N EL- O '3 ° > N T p c C c O N ° O O c co cc a0 a) co c N c6 Q c6 O co a O O) 0 a. N N D < _ E a o o �° 0 0 o aco ° Y m a o Z o ° E c0 3 a`) o .c ao 3 a) C • a Q m 7 c m 9 m m m L L m m 7 N a m o o m- '- o m On N ° n 3 0 0 3 m E o •m c a N N m a a c .3 .3 aa) m o a " N - 3 m o `m aNi o_ a) O N ac) m a>) o w o Z N > N - .. o .� U •U O 7 V N O N a d z m 45 3 0 L 0 0 0 o a .0 ° a o a) o ,3 o m E o c o a) o o c � o o N -o E ai m E L o) o aai a N N c ia_ F N a N N a) 7 7 Q c n 0 Cl) Cl) - a N a) a c0 E O) O :_� 7 c O p -0 Q L N m p p co ri,3 a N N °" w N O) 0- ca c6 f0 m O) co o N o) •c U .3 N � N O N C L a O E m 3 o m m m c o) 7 7 N m N ▪ o @ a =_ c -o .N •o n Tu n n o as = - I OJ m � a a a U .N m -a -a 0 0) N .N Cl)a) aa) > o) m � a) air a N ° 3 O o a c o E d a) CD 0 m O _c c c 0 C m a a O .N _ 3 "O 0 co C o N N c o C y W „(1) 7 3 c6 m m N U U E m 3 j 0 U m m U 0 a) = Cl) N 5 a 2 m - C U m cn m °U C C U U U N O O N U to O C U a) O O m "o @ r �j a E '3 a) C w U -° U,. _ m N 6 0 0 0 .� .� a ca a ° m n ° -7o m F- F- m 0- CD o• > m a a • c 5 U) N .0 .o ai J o 5 .5 a s a) D a n n 'Cr) a`) m 'I) a 0 0 0 2 2 2 cco -oo a) � `D - 0 0 .0° ° 0. a) a`) co 'm 0, o m V c a J ° 5 5 5 0) O O a a U Q a Z U CQ U U U U ¢ " Q ` O m m U 5 2 d ° co cn, c.� ° W a O ,- N CO V LU (0 N- 00 0) 0 N M V UI) CO h CO 0) O N CO V CL) (O I- CO 0) X EO - N c') V (n CO N- CO O) s- ,- N N N N N N N N N N CO CO CO CO CO CO CO CO CO CO ✓ 0 V V V' 2 O C -• (N - N 0 - 'CS N ° O • CO O • p V7 0 O O N CV 47 N an N N N aV w C 00 co a°) E J N N a) a) o W 1.E S QLL° 0 Q ; d a u 0 `+ Q Q w Q C7 Q