Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout214-127Post Office Box 244027 Anchorage, AK 99524-4027 3800 Centerpoint Drive Suite 1400 Anchorage, AK 99503 Phone: (907) 564-4891 06/09/2025 Mr. Jack Lau Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Re: Prudhoe Bay Surface Casing by Conductor Annulus Top-offs of Cement, Corrosion Inhibitor through 06/09/2025. Dear Mr. Lau, Enclosed please find a copy of a spreadsheet with a list of Prudhoe Bay wells that were topped-off with cement, corrosion inhibitor in the surface casing by conductor annulus through 06/09/2025. Cement top-offs are executed as needed to mitigate the void space left at surface by minor cement fallback during the primary surface casing by conductor cement job. The remaining void space between the top of the cement and the top of the conductor is filled with a heavier than water corrosion inhibitor to reduce the risk of external surface casing corrosion. The attached spreadsheets include the well names, API and PTD numbers, treatment dates and volumes. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404 Report of Sundry Operations. If you have any additional questions, please contact me at 564-4891 or oliver.sternicki@hilcorp.com. Sincerely, Oliver Sternicki Well Integrity Supervisor Hilcorp North Slope, LLC Digitally signed by Oliver Sternicki (4525) DN: cn=Oliver Sternicki (4525) Date: 2025.06.09 14:30:46 - 08'00' Oliver Sternicki (4525) Hilcorp North Slope LLC.Surface Casing by Conductor Annulus Cement, Corrosion Inhibitor Top-offReport of Sundry Operations (10-404)06/09/2025Well NamePTD #API #Initial top of cement (ft)Vol. of cement pumped (gal)Final top of cement (ft)Cement top off date Corrosion inhibitor (gal)Corrosion inhibitor/ sealant dateF-10C21308650029204100365/29/25F-29B2111475002921627026.25/29/25F-33A20816350029226400145/29/25F-3619519650029226310035/29/25F-39190141500292210100175/29/25F-44A2051615002922130012.55/29/25F-47B21007950029222320215/29/25L-2512231065002923772001.8813/31/24117/29/24L-2532230485002923758004.1201.13/31/24127/29/24L-2542230305002923752003.8321.23/31/24137/29/24L-2922230255002923751003.3301.33/31/24147/29/24N-282141275002923524006.8504.711/19/242212/28/24N-302141245002923523003.5330.311/17/243.512/28/24PAVE1-122309450029237670019.910/27/24PWDW3-221908150029236340014.810/27/24S-40120607850029233130015.31130.511/15/24412/28/246.8504.711/19/24N-282141275002923524002212/28/24 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Friday, January 19, 2024 SUBJECT:Mechanical Integrity Tests TO: FROM:Bob Noble P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC N-28 PRUDHOE BAY UNIT N-28 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 01/19/2024 N-28 50-029-23524-00-00 214-127-0 W SPT 8250 2141270 2062 303 301 304 303 274 531 519 509 4YRTST P Bob Noble 12/6/2023 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT N-28 Inspection Date: Tubing OA Packer Depth 47 2351 2295 2287IA 45 Min 60 Min Rel Insp Num: Insp Num:mitRCN231206153750 BBL Pumped:1.6 BBL Returned:1.8 Friday, January 19, 2024 Page 1 of 1             David Dempsey Hilcorp Alaska, LLC Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.dempsey2@hilcorp.com Please acknowledge receipt and return one copy of this transmittal. Received By: Date: Hilcorp North Slope, LLC Date: 08/09/2021 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL PBU N-28 (PTD 214-127) FTP Folder Contents: Log Print Files and LAS Data Files: Please include current contact information if different from above. Received By: 08/10/2021 37' (6HW By Abby Bell at 5:35 pm, Aug 10, 2021 MEMORANDUM TO: Jim Regg P.I. Supervisor vl /? ggiq FROM: Brian Bixby Petroleum Inspector State of Alaska Alaska Oil and Gas Conservation Commission DATE: Thursday, December 5, 2019 SUBJECT: Mechanical Integrity Tests BP Exploration (Alaska) Inc. N-28 PRUDHOE BAY UNIT N-28 Sre: Inspector Reviewed By: P.I. SuprvJ'F3iz— NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT N-28 - API Well Number 50-029-23524-00-00 Inspector Name: Brian Bixby Permit Number: 214-127-0 Inspection Date: 12/3/2019 .- Insp Num: mitBDB191204133826 Rel Insp Num: Packer Depth Pretest Initial 15 Min 36 Min 45 Min 60 Min Well N-28 Type Inj W "TVD szso 'Tubing ao ao 740 141 - PTD 2141270 "Type Test SPT Test psi 2062 IA 37 2400 2363 - 2357 ' BBL Pumped: 2.1 BBL Returned: 1 2 OA 108 - 358 346 " 341 ' Interval 4YRTST P/F I P Notes: Thursday, December 5, 2019 Page I of 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS �IVL.0 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown '-3+ Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program Plug for Reddll ❑ Perforate Nev, Pool ❑ Repair Well ❑ Reenter Susp Well ❑ Other' $eUP311 Multiple WR fa 0 In'ectian Gonf3anance or 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development ❑ Exploratory ❑ 5. Permit to Drill Number 214-127 3, Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service 8 1 6. API Number: 50-029-23524-00-00 7. Property Designation (Lease Number): ADL 028282 & 028283 8. Well Name and Number PBU N-28 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 10451 feet Plugs measured None feet true vertical 9168 feet Junk measured None feet Effective Depth: measured 10365 feet Packer measured 9439 feet true vertical 9090 feet Packer true vertical 8255 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 124 48-172 48-172 Surface 3129 9-5/8" 47-3176 47-3100 6870 4760 Intermediate 9675 7' 45-9720 45-8509 7240 5410 Production Liner 900 4-1/2" 9549-10449 8354-9166 Perforation Depth: Measured depth: 9883-10051 feet True vertical depth: 8656-8807 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr85 42-9562 42-8365 Packers and SSSV (type, measured and 4-1/2" HES TNT Penn Packer 9439 8255 true vertical depth) No SSSV Installed 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 9696 0 420 Subsequent to operation: 0 0 13057 50 460 14.Attachments: (reaumd per 20 nnc 25.070.25.071.425.283) 15. Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development ❑ Service m Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil ❑ Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG m GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NIA Authorized Name: Draughon, Austin Contact Name: Draughon, Austin Authorized Title: Petrol um ngineer Contact Email. Austin. DraughonLMbp.com Authorized Signature: Dale:' Z 3 ��� Contact Phone: +1 9075644033 Form 10-404 Revised 04/2017 G AAI fAc.k Ict"0 ij RBDMSS'9.--.IAN 2 4 2019 Submit Original Only Alaska Oil and Gas Conservation Commission 3333 West Seventh Avenue Anchorage, AK 99501-3572 RE: BP Exploration (Alaska), Inc. Report Of Sundry Well Operations (10-404) Well N-28 (PTD #214-127) January 23, 2019 To Whom it May Concern: Attached please find the attached Report Of Sundry Well Operations for well N-28 (PTD #214-127) for setting and pulling multiple WRPs to restore injection conformance. On August 14th 2018, a plug was set at 9995'MD to shut off injection to the lowest 2 perf intervals and instead force the injection into the uppermost 3 perf intervals. Forcing injection in this manner improves the injectivity of the rock by cooling it down. After sufficient injection to these 3 perf intervals, the plug was pulled and another plug was set at 9941'MD on September 22"d 2018. This forced the injection into the uppermost 2 perf intervals. This plug was pulled on November 11th 2018, and another plug was set at 9905'MD to force the injection into the uppermost pert interval. On December 30th, this plug was pulled out, restoring all 5 perf intervals open to injection and an IPROF was conducted to gather data on the injector conformance. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachments: Form 10-404 (Report Of Sundry Well Operations) Daily Report of Well Operations Wellbore Schematic ****WELL S/I UPON ARRIVAL**** (Profile Modification) LRS FREEZE PROTECTED TUBING & FLOWLINE DRIFTED W/ 10'x 2" DUMMY GUN, 3.70" WRP DRIFT, XN LOCATOR, 3.50" LIB TAG TOP OF 45KB PKR @ 10,010' SLM / 10,030' MD (Impression of 4-1/2" Uri) 8/13/2018 ****CONT JOB ON 8/14/18**** ****CONT. JOB FROM 8/13/18**** (Profile modification) RAN PDS 40 CALIPER LOG FROM 45KB PKR @ 10,010' SLM TO 8,950' SLM (Good data) SET 4-1/2" WFD SPECIAL CLEARANCE WRP @ 9995' MD 8/14/2018 ***PAD-OP POI WELL UPON DEPARTURE*** ***WELL S/I UPON ARRIVAL*** (profile modification) BAILED AND EQUALIZE 4 1/2" WRP 9963' SLM. W/ 3" BAILER AND EQ BOTTOM(recover minimal returns) PULLED WFD 4 1/2" SPECIAL CLEARANCE WRP FROM 9963' SLM. (returned all intact) RAN 10'x 3.17" DUMMY GUN, 3.68" CENT, 3" LIB TO 10,009' SLM / 10,030' MD (impression of kb packer) SET WFD 4 1/2" SPECIAL CLEARANCE WRP @ 9941' MD. 9/22/2018 ***WELL LEFT SHUT IN. DSO WALK THROUGH UPON DEPARTURE.*** SET WFD 4 1/2" SPECIAL CLEARANCE WRP @ 9941' MD. 11/28/18: WFD WRP PLUG MONTHLY RENTAL FOR 10/22/18 - 11/21/18. MO 02 (MM) 01/16/19: WFD WRP PLUG MONTHLY RENTAL FOR 12/01/18 - 12/31/18. MO 03 (CF) FINAL BILLING 11/11/18: PULLED 4 1/2" SPECIAL CLEARANCE WRP FROM 9,921' SLM & SET 41/2" WEATHERFORD SPECIAL CLEARANCE WRP @ 9905' MD. (SLICKLINE) 12/30/18: EQUALIZED & PULLED 4-1/2" WFD SPECIAL CLEARANCE WRP FROM 9,905' MD 9/22/2018 SLICKLINE ***WELL INJECTING UPON ARRIVAL*** (profile modification) RAN 10'x 3" PUMP BAILER W/ 3.69" WRP EQ BOTTOM TO WRP @ 9918' SLM 11/10/2018 ***CONT WSR ON 11/11/18*** ***CONT WSR FROM 11/10/18*** (profile modification) PULLED 4 1/2" SPECIAL CLEARANCE WRP FROM 9,921' SLM TAGGED CLEAN DEPLOYMENT SLEEVE W/ 10'x 2 7/8" DUMMY GUN, 3.70" WRP DRIFT, 3.50" LIB @ 10,005' SLM (25' corr) SET 4 1/2" WEATHERFORD SPECIAL CLEARANCE WRP @ 9905' MD. 11/11/2018 ***WELL LEFT SHUT IN. DSO DECLINED WALK THROUGH UPON DEPARTURE*** ***WELL INJECTING ON ARRIVAL** (Profile modification) EQUALIZED & PULLED 4-1/2" WFD SPECIAL CLEARANCE WRP FROM 9,905' MD 12/30/2018 ***JOB IN PROGRESS, CONTINUED ON 12/31/18 WSR*** ***CONTINUED FROM 12/30/18 WSR***(profile modification) RAN 4-1/2" XN-LOCATOR W/ BAILER TO XN @ 9,517' SLM (9549' MD) & TAGGED KB PKR @ 10,004' SLM. LOG PDS IPROF PER PROGRAM (Good data) 12/31/2018 ***WELL INJECTING ON DEPARTURE, DSO NOTIFIED OF WELL STATUS*** TRT= (7W4-1/16' VVE.LFFIID= FRC ACTUATOR= BAKERC OKB. E -EV = 91' BF. BEV = 46.06' KOP= 5W Max Angle = 42° Q 4276' Datum RD= 10144' Datum TVD= 880(r SSI O'OONDl1CTOR129#, X-56, D= 18.770' 172' /B' CSG, 47#, L -BO HYD 563, D = 8.681' 3176' Minimum ID = 3.725" @ 9549' 4-1/2" HES XN NIPPLE C NENT (PER SONIC LOG RAN BY RIG) Ij 8525 NCE# ADW -MU -12391 OF 4-1/2' LNi -1/2' LNRTOC 95 VAM TOP, -0152 bOf. ID= 3.958" CSG, 26#, L-80 VAM TOP, 363 bDf, D = 6.276' HYD 521, .0152 bpf, D = 3.958' N-28 SAFETY NOTES: •"4-12' CHROME TBG 6 LNR"' 617' 9-5/8' TAM FO=)= T COLLAR D ` 2224' 4-12" HPi X NP, D = 3.813' GAS LFT MANDRrLS ST PERFORATION SLA& ARY FIE= LOG: BKR LWD, MEMORY MODE(RES/DENPOR) DATE REV BY CDWENTS FROM 10/31114 - 11/16114 VLV ANGLEAT TOP PERF: 26" Q 9883' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sgz SHOT SQZ 33/8' 6 9883-9894 O 09/19/15 6391BG2 3-318" 6 9917-9930 O 09119115 0 3-318" 6 9975- 9980 O 09/19115 3-3/8" 6 10014 - 10020 O 09/19/15 8397G2 3-3/8" 6 10045 - 10051 O 09/19/15 0 HYD 521, .0152 bpf, D = 3.958' N-28 SAFETY NOTES: •"4-12' CHROME TBG 6 LNR"' 617' 9-5/8' TAM FO=)= T COLLAR D ` 2224' 4-12" HPi X NP, D = 3.813' GAS LFT MANDRrLS ST M)E25 COWAENTS DATE REV BY CDWENTS YPE VLV LATCH PORT DATE 5 3829G2 0924/18 Mn-VJKC RESET WFD ARP (09/22118) 01AW15 PJC OW BK 0 11119/14 4 6391BG2 03/09/17 RCB/ SET ROR w /X NP 8 ORIFICE CHOKE DMY BK 0 09116/15 3 7497G2 OW BK 0 11119/14 2 8397G2 DMY BK 0 11119/14 1 9211G2 DMY BK 0 11/19/14 14-12'HES X NP, D=3.813- I X 4-1/2' HES TNT PKR D = 3.865' 12'HFS X NP D=3 avv 9649' —14-12' HES XN NP, D = 3.725' 9F� 7" X 5- BKR HRD-E ZXP LTP w 10=5250- 4-1/2' =5250"4-1/2' VVLEG, D= 3.958' 9669' ELMDTTL56G®08/14/18 = 4.190' 15- X 4-12- XO, D = 3.900' I 14-1/2' MARKER PUP JT (NO RA TAG) DATE REV BY COWAENTS DATE REV BY CDWENTS 1120114 P-272 INTIf1LCOMPLETION 0821/18 JA/JMD ADDED LOGGED B -W TT 0127115 NNJMJ FINAL ODEAPPROVAL 0924/18 Mn-VJKC RESET WFD ARP (09/22118) 01AW15 PJC BASE FLANGE (BELL 01/04/15) 11/12118 CJNJMD RESETWFDWRP(11111/18) 08/04115 TRIPJC CDPDLJTOWKOP DEPTH UPDATE 01/09/19 JL/JMD SJLLEDWFDWRP(12130/18) 03/09/17 RCB/ SET ROR w /X NP 8 ORIFICE CHOKE 08116/18 LLG/ SET WFD SPCL CLEARANCE VVRP ;7 D = 2.313' /.25 ORIFICE CHOKE 8 L66' V (.125' SLOTS) (03107/17) T w /FRA TAG (&. 10083' PRUDFOE BAY UNIT WrLL N.28 PERMT No: '2141270 AH No: 50-029-23524-00 SEC 8, T11 N, R13F 1484' FSL 8 551' FVVL BP Exploration (Alaska) WELL LOG TRANSMITTAL PROACTIVE DIACINOSTIc SERVICES, INC. To: AOGCC Natural Resources Technician 333 W. 7th Ave Suite 100 Anchorage, Alaska 99501 (907)793-1225 RE: Cased Hole/Open Hole/Mechanical Logs and /or Tubing Inspection (Caliper / MTT) 214127 30317 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of : 1) Injection Profile 2) Signed Print Name: BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Marion Kendall LR2-1 900 Benson Blvd. Anchorage, AK 99508 GANCPDC gUSAANC.hou.xwh. BP. com and ProActive Diagnostic Services, Inc. Attn: Diane Williams 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245-8952 31 -Dec -18 N-28 CD RECEIVED FEB 0 1 X2+019 AOGCC 50-029-23524-00 Date: DZ/01//y PROACTIVE DIAGNOSTIC SERVICES, INC., 130W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245.8951 FAX: (907)245.8952 E-MAIL: POSANCHORAGEOMEMORYLOG.COM WEBSITE: WWW.MEMORYLOG.COM DaAchivesV l sterTemPlat ilex\Tempiat,,Wistnbution\TrammittelShee p Tmnsmicdoc 411 21417 WELL LOG TRANSMITTAL#904786342 2929 To: Alaska Oil and Gas Conservation Comm. June 4, 2018 Attn.: Makana Bender 333 West 7th Avenue, Suite 100 RECEIVED Anchorage, Alaska 99501 JUN 082018 RE: Injection Profile: N-28 Run Date: 4/15/2018 AOGCC' The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline &Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 N-28 Digital Log file 1 CD Rom 50-029-23524-00 Injection Profile (Final Field Print) SCANNED JUN 1 8 Z(.l18 1 Color Log 50-029-23524-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline &Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-275-2605 FRS_ANC@halliburton.com& AKGDMINTERNAL@bp.com Date: a•-P/1 / �` U Signed: OP • 21 41 27 2780 WELL LOG TRANSMITTAL 5 DATA LOGGED PROACTIVE DIAgNOSTIC SERVICES, INC. 1 /t1C/201? RECEIV wt.K.BENDER JAN 062017 To: AOGCC Makana Bender AOGCC 333 W. 7th Ave /`1V V Suite 100 Anchorage, Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and/or Tubing Inspection(Caliper/MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Merion Kendall LR2—1 900 Benson Blvd. ' Anchorage, AK 99508 %AMR ��;cR 20I gancpdc(d bp.com and ProActive Diagnostic Services, Inc. Attn: Ryan C. Rupe 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907)245-8952 1) Injectioon Profile 16-Dec-16 N-28 BL /CD 50-029-23524-00 2) Signed : ��v 1) /� Date : Print Name: PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAx: (907)245-8952 E-MAIL: PDSANCHORAGE(WMEMORYLOG.COM WEBSITE:WWW.MEMORYLOG.COM D:\Achives\MasterTemplateFi les\Templates\Distribution\TransmittalSheets\BP_Transmit.docx • i MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg `\e'/lf i rtizq I 5 DATE: Monday,December 28,2015 P.I.Supervisor [ SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC. N-28 FROM: Guy Cook PRUDHOE BAY UNIT N-28 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT N-28 API Well Number 50-029-23524-00-00 Inspector Name: Guy Cook Permit Number: 214-127-0 Inspection Date: 12/22/2015 Insp Num: mitGDC151222184420 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min WeIIl N-28 - Type lnj W "TVD 8254 ' Tubing 483 483 , 483 482 PTD 2141270 " 1Type Test SPT Test psi 2063.5 IA 715 2531 ' 2510 2505 - Interval INITAL P/F P / { OA 257 466 - 449 441 - Notes: 1,7 bbl pumped to test. MITIA. Kevin Parks not on site. Beau Obrigewitch,a well interity engineer,on site as operator rep. SCANNED SEP 16 2016 Monday,December 28,2015 Page 1 of 1 • I Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Thursday, November 26, 2015 9:57 AM To: AK, OPS GC2 OSM;AK, OPS GC2 Field O&M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; AK, OPS PCC Ops Lead; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; Peru, Cale; AK, OPS Well Pad MN;Wallace, Chris D (DOA) Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Morrison, Spencer; Sayers, Jessica; Dickerman, Eric; Pettus, Whitney; Regg, James B (DOA) Subject: UNDER EVALUATION:Injector N-28 (PTD #2141270) Place on Injection for Compliance Testing All, Injector N-28 (PTD#2141270) is a new well completed on November 20, 2014 that is ready to be placed on injection. At this time,the well has been reclassified as Under Evaluation to facilitate compliance testing. Please use caution when bringing the well online as the annuli are fluid packed. Plan Forward: 1. Operations: Place well on injection 2. Downhole Diagnostics: Once thermally stable, perform AOGCC witnessed MIT-IA Please call with any questions or concerns. Thank you, Whitney Pettus (Alternate: Kevin Parks) BP Alaska-Well Integrity Coordinator G SCA%NED AUG 1 S 2076' WIC Office: 907.659.5102 WIC Email: AKDCWelIIntegrityCoordinator@BP.com 1 • • G I—. - o • o 4 • E E (N o - a' 0 a. 0 • a a, a (� N CO I�,. • O 0) O 0) O 0) O 0) >, O O 0) 0 E 0 E O E O E O O • cc f.) >. C C C a) J a) J a) J a) J Z 3 0) CO 22 cc • U I ❑ ❑I I I c I a) N _ 0 ❑ ❑ T f0 CO LL LL 2 ❑ 2 ❑ 2 ❑ 2 ❑ c b N ❑ Z a)I °I YI O YI o YI o YI o LL m a> m ° = EJ E E E < LLc Z 3 c a a JI JI I JI al I 021m Im 21 = I mQ c m co U) CO 00 U) CO it O UI N I I I I I Q mo 2 � I p NQNQNQNNZ aEEr- - F HUZ Z EZZ Z Z Z Z Z c (0 @2 2 E N (N Ln O I0 ° c m I a) I aw a) I a0) m I a)a aI aa m I a) a) Z ❑ IL L • L.L it it it • LL it • it LL O EI- H rn a) H a) 1•-• a) H ..- it > LL JJ U O U _i U O UJ U O 0J U O .c..)_I 073 •U y YCO7 N E E_IQ E _I u) -c J -E —I c J •c—I -E J E —I E J c_I 'c a E • L) to f6 0) 0. 21 -1 2 1 o O 07 21 O 0) 21 O 0) 21 O C 21 O 'E O-E < (I) _°j U, 0m CO 0m CO 0— 0m 0— 0m 0— 0m 0_ 0m 0 0_ 0 0_ J a)coI@ 0.)00117d a)_ a)cola)_ a)cola)= a)coI _°= ycol _° a) a) a) ce Q EO W N❑ W N W ❑ W N W❑ W N MI5 N W❑ W N W W W 2 O ° c o Ln Ln t0 LnLO CL a) 0 0 0 0 0 0 0 0 0 0 0 CO •O'.,N N N N N N N N (N N N N p O o N CN CN r N N N N .N- IX @ �- - LL W w Z or. U O. OU Z Q S a @ O V d w is y o a w ° O 5 coCfl 0 ZI COO N G C '5O V1 N O N IT:)- N f E 0.I:: M ✓ ° E r U co i7) c o Q _ CL Z 1,on ao Z R N w 3. Z 0cm la .o rD 0 a) 5 _ W J 2 G N Z CO �++ m W 0 J N O a) x Cn _ coo ❑ x Q a ° w °- -)1 CC o Q a E 0 ? °d U w 0E J ii Z 3 3 c co ❑ 0 0 0 0 0 0 0 0 0 0 0 co 3m o @ @ @ @ @ @ @ @ @ CO 0) re Z a .to 5 .5 .5 .a .a .a .c •c •c •c •a) fp Z O. . 0 0 0 0 0 0 0 0 0 O 15 0 0 a) ,00 00 00 00 00 00 eO 00 OO 00 c0 00 N w (0 Q '.a0 00 W 00 00 W W00 00 00 00 co r H y 0 (0 E I.N N N N N N N N N (N N (N Q Z . C A) CO 3 IIg LO LO LO LO LO LO LO LO LI) LO LO N p Q 0 W G Z IN N (N (N N N N N (N N N N O Q c @ LL 0 p Ln ix ` m(` 0 o 0 d p 0 U Z W 0 2 0 0 0 0 0 0 0 0 0 0 0 0 CD E D Q Cf/ J 04 • 0 CJ I- O. N Q)« O. ❑ 0 0 0 0 0 0 0 0 0 0 0 O. 0 I--' 3 •3 w w w w w w w w w w w w ! • o • • . o o o oo o .9 U o O S X to N NLO N N a) a ca c o N W LU N LU LU E d @ ai UI 0 O I CD co O a) a) U W n co LU N- co 2 2 6 a N d w co } ' co Co ml a RS m a a) N >, >. >. al aI N- a1 a1 LU U c a) c a ti CV N l = l N ZZ N 0 N N I2 I a 2 C) >,O > > o 0D a I I I 0o co .1 ZZ b z,NN TO (0 N H o co co O U) co 0) D D D 'Z'c 1 c c z iii co aiQ uiQ 0 Q Q N- r- iim a)J co N 0a a 0a a Z it WI WI CO c�1 c 1 d I 1 I �I c m1 m1 m1 m �I �I cc C ce < i��1 �1 z�1 z�I Z co N N co co W -Q -DI __DI < DI DI DI DI '0 -0 1 0 1 U 0 113Ce Ia M M M M M a) e)N o_co acn U` I Z Z Z I co j co U U)U Z JI Z U Z U Z U Z U N r. �I U of m �I cou.)1 ✓ a) a) m0 mU CU ma ma mU a)a �a °'a •=a mo cc000 °)o 'I'E. Z LL ILL LLL a 0 1 D 1 N D Iy Li: I LL Ivi W 1cW I LLL I D� Dw LLN itN c�o U c> a° ci 022 c)2 2 02 c)2 = c)2= o2 02 c) o- 015_ °a 01:1_ 'c o- 'c •c co 'c a to ••c a _ .c a - .c a�) .c a ° 'c a 'c a •'c a •'c a) 'c a) 'c a) •'c a) fn o O 'E 2 2 c.L 2 f0 coc i Oa'= Oa''o Oa'2 2° Oa' Oa' Oa) Oco 2o).(4 Oo)-0 cn 6 a v v < i)2= 2o3 62m 622 -62o3 j co �2 t2 ,- 6� 6'--o 6,- 5 m a) a) a) v w a)coI I a)aoI coI a)aoI U)I a)co1 co 0101 a)coI coI N co1 a)co a)of a)coI m coI •• a)ao1 c ce Q W LY W W N 2 W N I W N e— L L)N W N I W N‘- W CV l- W N W N W N W N W N U W N O 0 0 3 0 0 0 0 In In In In 0 In LO In 0 0 to CL f= o 0 0 0 0 0 0 0 0 0 0 0 0 0 W g N N N N N N N N N N N N N N N O O 0 O O O O O CO 0 W 00 -I N N N CO CO CO M CO CO M M O O O O INi J O) O) O) m a W w z V a U Z m +o co co Q 0 O O O coCV CV N O Oj J ow a Li co _ _ N. ,- CO15 co C N 001 N O0) 0) O N n E U � w U o N Q0 per N , I . Z Hz io E. 2 (N CD I M Q W CO d1 ,�ApIli a) Cl) 0 0 QCec a a) la aO CI Z I' U co COCoc o Z co co as as a) a) as as co as as co a) .9 .9 a) (0 CO CO V (0 CO 03 CO CO CO CO CO CO (0 a) CO • CO 0 0 0 a) 0 0 0 0 0 0 0 0 0 0 0 0 (.0 0 •m (o Z 9 m la To T co yo m co co To co) CD 'rn 0 a) 01 rn a) 0) rn 0) 0) a) _rn 0 D D D D D D D D D D D D D D D D I r > co o co co rn rn rno) o) o) a) a) 0 0 0 0 N I- CO CO CO CO CO CO CO UO CO CO CO CO N N N N r N N N N N N N N N N N N CO CO CO co e' co Lo U co 0 co co co co 0 0 0 co co co 0 N N N N N N N N (N N N N N N N N N G• U O o U 1U U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07 a d D 0 0 0 p 0 0 0 0 0 0 0 0 0 0 0 0 d a 2 w w w w LU w w w LU W LU w w w w LU • • o o o G R _(� N ig , o N } 0 ›- ›- } C) _) N 4 O D 4- N L T T o dZ m c 1^ o I- °) < a J z o IZ L t -.4 07 II } E- m am 2 Z ° 00 ZIvW 0 v JI I ....t. Q_0) -HI ti Q is 0 CO �I — O 0 H Z �w .. I II 1 o a�fri ao d �/ >. m w °rn ('4 N.0 E >- Q H H m H g �i v_ W C.) H c IX Q N W N N S Q N11 o _ .- " Z m H @ :d CL 0 U o Ein E °7 o I �W/ tz CO- CO Z N Li. OJ oH a ii E W11 X Z 'Q- rn u> m11 ✓ a O ' @ ° a m Q E J m IIH Z .p 4: In 1'.I o 11 0 co 0) H {6 O J a Q N C H I'i.II J 0 w 0 E CL O in c 0 U C a) H G o o N o oO N a U 0d coo J >- O E C E °' Q 03 ° ° th Q. N Z ° l I— Z u) ea N ''''z2 1 zH C D N Z m — ' 1 G Q ca a) 0 vi 0 m c a) E m rn c 0 1- E w0 a) t as tw D CO I @ a) c D C OH I ac I— To f2 o ° m O 11 Q o Z o ` 0> CI -al UE c 1I b m i 16 0 I Z co a) a) .4- 0 CO '0 i I CO 03 0 CO C Q N N O a3 C O co O O16 (� >- } m a) o J E b o p O c T N 1- N N 0 la 0 , N r m r' F 1 M M W E D. O I 3 r N N d W p 0 I H F. _ W a) `I a' E E 0 N N 2,`-2 (R a F a) V o w o p `o Z az 0 in v 0 Q o o o o C U :5 0 0 v W 0 0 0 a a 0 0 E I a tas 07 E O -0 E a) 0 E E d o p - o d LL o 2 aa)) I O o a) d 0 1 0 a 2 w J J 3 3 0 a C9 C) 0 G c.) 1 1 O • • Brooks, Phoebe L (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWelllntegrityCoordinator@bp.com> Sent: Tuesday, January 05, 2016 5:43 AM To: Brooks, Phoebe L(DOA) Cc: AK, D&C Well Integrity Coordinator Subject: RE: December 2015 AOGCC MIT Forms Attachments: N-29 WBS.pdf; N-28 WBS.pdf Phoebe, Enclosed are the wellbore schematics for N-28 PTD#2141270 and N-29 PTD#2141100. Thank you Kevin Parks ', ) BP Alaska-Well Integrity Coordinator Global Wells if Organi iior: Office: 907.659.5102 WIC Email:AKDCWeIllntegrityCoordinator@bp.com From: Brooks, Phoebe L (DOA) [mailto:phoebe.brooks@alaska.gov] Sent: Monday, January 04, 2016 4:57 PM To: AK, D&C Well Integrity Coordinator Subject: RE: December 2015 AOGCC MIT Forms Kevin/Whitney, Will you send me the well schematics for N-28 PTD#2141270 and N-29 PTD#2141100? Thank you, Phoebe Phoebe Brooks Statistical Technician II Alaska Oil and Gas Conservation Commission Phone: 907-793-1242 Fax: 907-276-7542 CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federallaw.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Phoebe Brooks at 907-793-1242 or phoebe.brooks@alaska.gov. From: AK, D&C Well Integrity Coordinator [mailto:AKDCWeIllntegrityCoordinator@bp.com] Sent: Saturday, January 02, 2016 7:28 PM To: Regg, James B (DOA); Wallace, Chris D (DOA); Brooks, Phoebe L (DOA); DOA AOGCC Prudhoe Bay 1 IP • Cc: AK tY9D&C Well Inte ri Coordina Subject: December 2015 AOGCC MIT Forms All, Please find the attached MIT forms for December 2015: Well PTD Comments N-28 2141270 AOGCC Form N-29 2141100 AOGCC Form NGI-03 1750610 AOGCC Form NGI-05 1760140 AOGCC Form X-24A 1991250 AOGCC Form Z-102 2070500 AOGCC Form Kevin Parks ',,r^ 1,!if , ✓Pea „ BP Alaska-Well Integrity Coordinator Glob&fells NOI Organizal or Office: 907.659.5102 WIC Email:AKDCWelllntegrityCoordinator@bp.com 2 TREE= CNV 4-1/16" WELLHEAD= , FMC • N -2 8 SAFETY NOTES: ***4-1/2"CHROME TBG& LNR•** ACTUATOR= BAKER C OKB REV;-=------417 ry 4.1 BF.ELEV= 4606' - 517' —9-5/8"TAM PORT COLLAR,ID=8.810" ot KOP= 500' V' Max Angie= 42°Gr 4276' ,r I ,4•* 2224' —4-1/2"HES X NP,D=3.813" Datum MD= 10144' f� - Datum ND= 8800'SS 74( g. 20"CONDUCTOR,1294,X-56,D= 18.770' 172' GAS LFT MANDRaS ST ND TVD DEV TYPE VLV LATCH FORT DATE 9-5/8"CSG,47#,L-80 HYD 563,D=8.681" — 3176' 5 x3829 3708 29 KBG2 DMY BK 0 11/19/14 4 x6391 *5646 42 KBG2 DCK-2 BEK - 11/19/14 Minimum ID = 3.725" @ 9549' 3 '7497 6502 27 KBG2 DMY BK 0 11/19/14 2 r8397 ''7311 26 KBG2 DMY BK 0 11/19/14 4-1/2" HES XN NIPPLE 1 "9211 *8047 25 KBG2 DM' BK 0 11/19/14 TOP OF CEMENT(PER SONIC LOG RAN BY RIG) — 8525' REFERENCE#ADW-MOC-12391 ' 9409' —14-1/2"HES X NP,D=3.813" 70 '7' 9439' —17'X 4-1/2"HES TNT PKR U=3.865' I 9476' —4-1/2'HES X NP,D=3.813" *' 9549' —4-112"HES XN NP,ID=3.725" TOP OF 4-112'LM1R — 9549' 9549' I—7"X 5"BKR HRD-E ZXP LTP w/T1EBK SLV, — I 13=5.250" 0 4-1/2'LNR TOC H 9549' .y ry4le W 9562' 4 1/2" LEG,D=3.958" 4-1/2"TBG, 12.6#,13CR-85 VAM TOP, H 9562' ELK)TT NOT LOGGED 0152 bpf,D=3.958' fes`+{ 14 j 9572' —7"X 5"HES VERSA FLEX HGR,D=4.190" Y w jrR °� 9582' 5"X 4-1/2"XO,D=3.900" 7'CSG,264,L-80 VAM TOP, — 9720' i# ` 4 .0383 bpf,D=6.276" ' *' r t.► , 4; 9827' H4-1/2'MARKER PUP JT(NO RA TAG) PERFORATION SLM4ARY REF LOG:BKR LWD,MEMORY MODE(RES/CEN/FOR) :*; FROM 10/31/14- 11/16/14 ANGLE AT TOP PERF:26°@ 9883' 47;+ 1...,1 Nute:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz SHOT SW Ur'.4 3-3/8" 6 9883-9894 0 09/19/15 ;* 3-3/8" 6 9917-9930 0 09/19/15 k c+1 3-3/8" 6 9975-9980 0 09/19/15 '* 3318" 6 10014- 10020 0 09/19/15 ° t10078' —4-1/2"MARKER;JT w/RA TAG c@ 10083' 3-3/8" 6 10045- 10051 0 09/19/15 �.k, PBTD — 10365' �r��,��T V ,�, 4-1/2'LNR, 12.6#,13CR-85 HYD 521, —I 10449' ,0152 bpf, D=3.958' DATE REV BY COMMENTS DATE REV BY COMMENTS FRUDHOE BAY UNIT 11/20/14 P-272 INITIAL COMF1-ETION 10/15/15 p-FS/JMD FEi2FS(09/19/15) WELL: N-28 12/02/14 JMD DRLG HO CORRECTIONS F'ERMT No: 2141270 12/30/14 NWJMD ADDITIONAL EDITS PER ODE AR Nu: 50-029-23524-00 { 01/27/15 NN/JMD FINAL ODE APFROVAL SEC 8,T11N,R13E, 1484'FSL&551'FW. 01/04/15 PJC BA SEFLANGE(BFI..L01/04/15) 08/04/15 TR/PJC CONDUCTOR/KOP DEPTH UPDATE BP Exploration(Alaska) P6u. tl-Z• • prn Zt4iz70 Regg, James B (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> .ice 1Z1z/ Sent: Wednesday, December 23, 2015 7:43 AM �I S To: AK, OPS GC2 OSM;AK, OPS GC2 Field O&M IL;AK, OPS GC2 Wellpad Lead;AK, OPS Prod Controllers; AK, OPS PCC Ops Lead; Cismoski, Doug A; Daniel, Ryan;AK, D&C Well Services Operations Superintendent;AK, D&C Wireline Operations Superintendent;AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; Peru, Cale;AK, OPS Well Pad MN;Wallace, Chris D (DOA) Cc: AK, D&C Well Integrity Coordinator;AK, D&C DHD Well Integrity Engineer;AK, D&C Projects Well Integrity Engineer;AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Morrison, Spencer; Sayers,Jessica; Dickerman, Eric; Regg, James B (DOA) Subject: OPERABLE:Injector N-28 (PTD#2141270) AOGCC MIT-IA Passed All, Injector N-28 (PTD#2141270) passed an AOGCC witnessed MIT-IA to 2500 psi on December 22, 2015 . This passing test confirms two competent barriers in the wellbore. The well is reclassified as Operable. Please call with any questions or concerns. Thank you, Kevin Parks F1`Pd°f}?-r.t Jai Gift,. BP Alaska-Well Integrity Coordinator GV11t to al h ells 0rganizat o Office: 907.659.5102 WIC Email:AKDCWeIlIntegrityCoordinator@bp.com From: AK, D&C Well Integrity Coordinator Sent: Thursday, November 26, 2015 9:57 AM To: AK, OPS GC2 OSM; AK, OPS GC2 Field O&M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; AK, OPS PCC Ops Lead; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Superintendent; AK, D&C Wireline Operations Superintendent; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; Peru, Cale; AK, OPS Well Pad MN; 'chris.wallace@alaska.gov' Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Morrison, Spencer; Sayers, Jessica; Dickerman, Eric; Pettus, Whitney; 'Regg, James B (DOA) (jim.regg@ialaska.gov)' Subject: UNDER EVALUATION: Injector N-28 (PTD #2141270) Place on Injection for Compliance Testing All, Injector N-28 (PTD#2141270) is a new well completed on November 20, 2014 that is ready to be placed on injection. At this time, the well has been reclassified as Under Evaluation to facilitate compliance testing. Please use caution when bringing the well online as the annuli are fluid packed. Plan Forward: 1. Operations: Place well on injection 1 • • 2. Downhole Diagnostics: Once thermally stable, perform AOGCC witnessed MIT-IA Please call with any questions or concerns. Thank you, Whitney Pettus (4Iie,nary. Kevin Purk BP Alaska-Well Integrity Coordinator e,I WIC Office: 907.659.5102 WIC Email: AKDCWellIntegrityCoordinator@BP.com 2 12/28/2015 • PBU N-28/PTD#214-127 a PBU N-28 / PTD # 214-127 Lastufka, Joseph N [Joseph.Lastufka@bp.com] Sent:Monday, December 21, 2015 4:54 PM To: AOGCC Reporting (DOA sponsored) Hello, Please reference the following well: Well Name: PBU N-28 Permit #: 214-127 API #: 50-029-23524-00-00 This well began Injection on: 12/15/2015 Method of Operations on this date: Water Injection https://webm ai la.alaska.gov/owa/?ae=Item&t=IPM.N ote&i d=RgAAAABKLne2zgP4SoM kepOhC xbSBw BU vQ964rj QTgYgn3632GdIAAAAhhLyAABUvQ964rjQT... 1/1 r STATE OF ALASKA RECEIVED ASKA OIL AND GAS CONSERVATION COMMIS 0 C T 15 2015 WELL PLETION OR RECOMPLETION REPO•ND LOG la. Well Status: Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended 0 lb.Wellfila s�GCC 20AAC 25.105 20AAC 25.110 Development ❑ Exploratory 0 GINJ 0 WINJ 0 WAG IRE • WDSPL 0 No.of Completions: One ' Service RI Stratigraphic Test ❑ 2. Operator Name: 6. Date Comp.,Susp.,or Aband.: 14.Permit to Drill Number/Sundry BP Exploration(Alaska),Inc •9/19/2015 / •214-127 3. Address: 7. Date Spudded: 15' API Number: P.O.Box 196612 Anchorage,AK 99519-6612 •10/31/2014 '50-029-23524-00-00 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number: •11/16/2014 •PBU N-28 Surface: 1483'FSL,4728'FEL,Sec.08,T11N,R13E,UM • 17. Field/Pool(s): 9. KB(ft above MSL): 91' • Top of Productive Interval: 1467'FNL,2062'FEL,Sec.17,T11N,R13E,UM GL(ft above MSL): 43.9' . PRUDHOE BAY/PRUDHOE OIL • Total Depth: 1721'FNL,2009'FEL,Sec.17,T11N,R13E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: •10365'/9090' ADL 028282&028283 . 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/TVD): 19. Land Use Permit: Surface:x- 634410. y- 5967388 ' Zone - ASP 4 '10451'/9168' . TPI: x- 637139 y- 5964485 Zone - ASP 4 12. SSSV Depth(MD/TVD): 20 Thickness of Permafrost MD/TVD: Total Depth:x- 637197 y- 5964233 Zone - ASP 4 2224'/2183'(Nipple) 1977'/1943' 5. Directional Survey: Yes lI (attached) No ❑ 13. Water Depth.if Offshore: 21. Re-drill/Lateral Top Window MD/I-VD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) N/A 22. Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary GR,GR/RES,GR/RES/NEU/DEN,USIT 23. CASING,LINER AND CEMENTING RECORD CASING wr.PER GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT FT. PULLED TOP BOTTOM TOP BOTTOM 20" 133# X-56 48' 172' 48' 172' Driven 9-5/8" 47# L-80 47' 3176' 47' 3100' 12-1/4" 1691 sx LiteCrete,295 sx Class'G' 7" 26# L-80 45' 9720' 45' 8509' 8-1/2" 243 sx Class'G' 4-1/2" 12.6# 13Cr85 9549' 10449' 8354' 9166' 6-1/8" 117 sx Class'G' 24. Open to production or injection? Yes RI No 0 25. TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): 4-1/2"12.6#13Cr85 9562' 9439'/8254' 3-3/8"Gun Diameter,6 spf --^..--- "" R DUPLE! 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 9883'-9894' 8656'-8665' ' 9917'-9930' 8686'-8698' Was hydraulic fracturing used during completion? 9975'-9980' 8738'-8743' Yes 0 No • Per 20 AAC 25.283(i)(2)attach electronic and printed 10014'-10020' 8773'-8779' 21 1 information 10045'-10051' 8801'-8607' `('�I t / , � j DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 2200' Freeze Protect w/74 Bbls Diesel 27. PRODUCTION TEST Date First Production: Not on Injection Method of Operation(Flowing,gas lift,etc.):N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period —0 Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press 24 Hour Rate �► Form 10-407 Revised 5/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only V n-- 'l0/23/ s ,�lp9 �-- RBDMS2jOCT 2 0 2015 mss., /c,,--z-e,if G 28. CORE DATA • Conventional Core(s) Yes ❑ No O Sidewall Cores Yes ❑ No Q If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lit ology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost-Top 43' 43' Well Tested? Yes 0 No ll Permafrost-Base 2020' 1986' If yes,list intervals and formations tested,briefly summarizing test results.Attach separate sheets to this form,if needed,and submit detailed test information per 20 Ugnu 4071' 3911' AAC 25.071. West Sak 5771' 5187' Colville Mudstone 6251' 5542' HRZ 7877' 6843' Base of HRZ 8128' 7070' LCU/Kingak 8148' 7088' Sag River 9722' 8511' Shublik 9758' 8543' SADLEROCHIT-ZONE 4 9852' 8628' CGL-Zone 3 10060' 8815' Base of CGL-Zone 2C 10138' 8885' Zone 1B 10406' 9127' Formation at total depth: Zone 1B 10406' 9127' 31. List of Attachments: Summary of Daily Drilling Reports,Summary of Post-Rig Work,LOT/FIT Summary,Well Schematic Diagram,Survey,Cement Reports Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis,paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Nocas,Noel Email: Noel.Nocas@bp.com Printed Name: Joe Lastufk Title: Drilling Technologist Signature: Phone: +1 907 564 4091 Date: IV 715/4 5 INSTRUCTIONS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item la. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item lb.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and ND for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump, Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31.Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 5/2015 Submit ORIGINAL Only •TREE= CIW4-1/16" — WELLHEAD FMC N -28 SAFE OTES: ***4-1/2"CHROME TBG x LNR*** ACTUATOR= BAKER C OKB ELEV= 91' BF.EIV= 46.06' i..- 517' H9-5/8'TAM PORT COLLAR,ID=8.810' KOP= 500' r ;: 2224' -�4-112"HES X NP,D=3.813" kix Angle= 42°@ 4276' * ' Datum MD= 10144' Datum TVD= 8800'SS 4. lc 20"CONDUCTOR,129#,X-56,D=18.770" — 172' GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 9-518"CSG,47#,L-80 HYD 563,D=8-681' H 3176' 5 '3829 3708 29 KBG2 DMY BK 0 11119/14 14 '6391 '5646 42 KBG2 DCK-2 BEK - 11/19/14 Minimum ID = 3.725" @ 9549' 3 '7497 6502 27 KBG2 DMY BK 0 11/19/14 2 '8397 '7311 26 KBG2 OMY BK 0 11119/14 4-112" HES XN NIPPLE 1 '9211 '8047 25 KBG2 DMY BK 0 11/19/14 TOP OF CEMENT(PER SONIC LOG RAN BY RIG) H 8525' ��`# REFERENCE#ADW-MOC-12391 :�� ,,y,v � ' 9409' H 4-1/2'HES X NP,D=3.813' ti. r 9439• -j7'X 4-1/2"HES TNT PKR,D=3.865" r.,,:. 9476' --{4-1/2'HES X NP,D=3.813" 9549' H4-1/2"HES XN NP,ID=3.725" TOP OF 4-112"LNR — 9549' , SI 9549' 1-7"X 5"BKR HRD-E ZXP LW w/T1EBK SLV, ;-.4* I 4-1/2'LNR TOC — 9549' r� i D=5.250" •4. ��4 9562' H4-1/2"WLEG,D=3.958" 4-1/2"TBG, 12.6#,13C R-85 VA M TOP, — 9562' ,lig,lir. -i BMD TT NOT LOGGED 0152 bf,D=3.958" !� p r*� 9572' —j 7"X 5"HES VERSA FLEXHGR,D=4.190' > k41 tilI' 9582' H5"X 4-1/2"XO,D=3.900" 7"CSG,26#,L-80 VAM TOP, — 9720' Y Yr ►,.4�`. # 0383 bpf,D=6.276" 04 9827' H4-1/2"MARKER PUP JT(NO RA TAG) PERFORATION SUMMARY t 4,.i:' REF LOG:BKR LWD,NEMDRI MODE(RES/OEN/POR) }# FROM 10/31/14-11/16/14 ANGLE AT TOP FEW:26°@ 9883' '`'•t Note:Refer to Production DB for historical perf data ii-ti SIZE SPF INTERVAL OpniSgz SHOT SQZ ,.1..".:; ■.,.. 3-3/8" 6 9883-9894 0 09/19/15 �* 33/8" 6 9917-9930 0 09/19/15 4 3-3/8" 6 9975-9980 0 09/19/15 +: 4A,At 3-3/8" 6 10014-10020 0 09/19/15 4.-.4- +� 10078' —{4-1/2"MARKER JT w/RA TAG @ 10083' 3-3/8" 6 10045-10051 0 09/19115 4.-.4- 4 i 'f,1 � PBTD — 10365' f'►#'41•64440 01111 '► +.•*�111111!y 4-1/2'LNT� 12.6#,13CR-85 HYD 521, H 10449' .0152 bpf,U=3.958" DATE REV BY COI/Ms/TS DATE REV BY COMMENTS PRUDHOE BAY UNIT 11/20/14 P-272 INITIAL COMFEETION 10/15/15 DIHSS/JMD PE-FS(09/19/15) WELL: N-28 12/02/14 JM) DRUG HO CORRECTIONS _ IWNo- 2141270 12130/14 NWJMD ADDITIONAL EDITS PER ODE AR No: 50-029-23524-00 01/27/15 NWJMD FINAL ODE APPROVAL SEC 8,T11N,R13E,1484'FSL&551'FW.. 01/04/15 PJC BASE FLANGE(BELL 01/04/15) 08/04/15 TR/PJC CONDUCTOR/KOP DEFTH UPDATE BP Exploration(Alaska) 'tAt, ���� \ -- � | •��r - o 6' �� | � / �� U �0 � ' | | � a" ' �� k 910 L ° c� '0 � | m ( -��- | ei I � ~� K -- -- �] )\ v_ _ J. r..=-=. _ _ _ -f -- -- -^ ---- _� » -- - �� .�. r- [] I | | ~ ^� {, � „ - � | / / 11-113 PROJECT ~ [] [] 4_� | ~ '~ I �� �� L -- -- -- __ --__ I f z� `. ... -- ' ------ . ---~ � -��>^ '--- -- - -- -- --' ��' - ' �� `\� r� -- -- ,] ___- 1 | ,� � __� _ .� � � __ �-- -- --- e� �� yn��� ^�n � v '� -9 U ]O~�� ` 17 [ � �~�_��� /y� _ ," __ __ � _- ' - 270 ^ ��_ -- -'� �260 — VICINITY MAP w-ao ' ' ' | mrS ) �� |] � ^~ ) || 6 |' ° . | " — — -- 4 0 ~^" ( 3 M ,0410114%US II 1 �� 414" OF it Ki, IP� | ���w-�n � � . �|27 14 � —__' � �I�� .= ' | _ �~ . x /*" N N� LEGEND: 1 '= oe '1> 11 41111P i `�+ ^s-BUILT-BUILTr Al m EXISTING CONDUCTOR \ { .• 1 | 220 m»rEu -~IUM~h'6- 1. ALASKA STATE PLANE COORDINATES ARE ZONE \ 4 �Dzz SUR VEYOR' SCERTIFICATE/ »=~ -_- _--_^ `^~~^'- COORDINATES ARE wxooz HEREBYI CERTIFY 2. HORIZONTAL AND VERTICALom�� AREPROPERLY ON N PAD OPERATOR MONUMENTS w-1 TO PRACTICE LAND SURVEYING IN GRAPHIC SCALE AND N-2. STATE OF ALASKA AND THAT 3. ELEVATIONS ARE BP EXPLORATION wsxw SEA AS-BUILTREPRESENTS SURVEY 0 250 500 1000 LEVEL DATUM. MADE UNDERDIRECT / �������" ' 4. MEAN PAD SCALE FACTOR IS: 0.9999206 SUPERVISION�-- - --AND THAT ALL ( IN FEsr ) 5. DATE OF SURVEY: AUGUST 05 2014. DIMENSIONS AND OTHER DETAILS ARE 1 inch = 500 ft. 6. REFERENCE FIELD BOOK: wu4-47. PGs. 02-09. CORRECT AS OF AUGUST 05' 2014. LOCATED WITHIN PROTRACTED SEC. 8, T. 11 N., R. 13 E, UMIAT MER|D|AN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION NO. COORDINATES COORDINATES POS|TION(DMS) POS|T|ON(o.DD) BOX ELEV. OFFSETS Y=50V7JO755 N 1969.70 7019'07.835" 70 �18O��1' . 1'483' FSL N-28 ' ' � 438 . X= 634.410.37 E 1000.14 148'54'37.301^ 148.3103782^ � 4`728FEL Y=5958�5O5� N 2940.80 7Ul9'17JDJ^ 703214954^ . 2454' FSL N 29 ' ' � � . �J9 ' - X= 634.414.67 E 1001.65 148'54/J§72S 148.9102024' � 4,703' FEL Y=5,968,087.24 N 2669.45 7O�Q'�4.71O^ 7OJ207543' . 2'183' FSL N_3O 4�7 X= 634,412.16 E 999.92 148'54.36.944. 148.9102621' 4`712. FEL ' "A"' ma ------ ---- CHECKED: L a 09 14 J� bp veii DRAWING ��W� � ,�oe°u �=. . WOA - N PAD AS-BUILT CONDUCTOR LOCATION SHEET�8/v9�~�=�n�mvp�n� waon ,^��m/ WELL N-28, N-29, & N-30 1 OF 1 NO DATE m"oo" BY OHS . • • BP AMERICA .'` ' LOT/ FIT Summary r, Well Name: N-28 Surface Leak Off 7c," Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD-Ft) (TVD-Ft) (ppg) (psi) (BHP) (psi) (ppg) 11/07/14 LOT 3,180.00 3,100.00 9.50 660.00 2,189.87 13.60 11/16/14 FIT 9,720.00 8,504.35 8.50 890.00 4,645.17 10.51 Page 1 of 1 • • North America-ALASKA-BP Page 1 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 I91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10/29/2014 00:00 - 03:00 3.00 MOB P PRE DRESS WELLHEAD AND SECURE WELLHOUSE -REMOVE ALL SURFACE LINES FROM RIG FLOOR -REMOVE OFFLINE MOUSEHOLES 1-RIG DOWN MUD MOD AND DRILL MOD INTERCONNECTS 03:00 08:00 5.00 MOB P PRE PREPARE TO SKID FLOOR AND LAY OVER DERRICK -BRIDAL UP -SECURE IDM AND FORUM CRANE -TIE BACK SERVICELOOP AND KELLY HOSE -REMOVE ICE AND SNOW FROM ROOF TOP -MOVE WALK WAYS -SUCK OUT SUMPS ON RIG FLOOR -TORQUE LUG NUTS ON TIRES -DISCONNECT STEAMLINES AND WATER LINES FROM UNDER FLOOR ;08:00 - 10:30 2.50 MOB P PRE SKID FLOOR AND LOWER DERRICK -PERFORM PRESKID CHECKLIST PRIOR TO SKIDDING FLOOR -PERFORM DERRICK INSPECTION PRIOR TO LAYING OVER MAST 10:30 - 16:30 6.00 MOB- - P PRE RIG MOVE -SECURE ROOFTOPS -DISCONNECT ELECTRICAL INTERCONNECTS -SEPARATE AND STAGE MUD MOD,UTILITY MOD,AND DRILL MOD NEXT TO N-28 16:30 - 18:00 1.50 MOB P PRE PULL DUMMY WELLHOUSE FROM N-30 AND INSTALL ON N-28 _ CLEAN UP AROUND N-30 CELLAR 18:00 - 00:00 6.00 MOB P PRE 'SPOT DRILL MOD OVER WELL -HOIST HIGH PRESSURE RISER INTO BOP DECK -SPOT MUD MOD NEXT TO DRILL MOD 10/30/2014 00:00 - 01:30 1.50 MOB P PRE SPOT UTILITY MOD NEXT TO DRILL MOD -SHIM MODULES AS NEEDED TO LEVEL -RAISE DRIVERS CABS TO MODULES 01:30 - 04:30 3.00 RIGU P PRE RIG UP -PREPARE TO RAISE DERRICK AND SKID FLOOR -RIG UP INTERCONNECTS BETWEEN MODULES -SPOT CUTTINGS BOX -PREPARE PITS TO TAKE ON MUD _ 04:30 - 06:30 2.00 RIGU P PRE RAISE DERRICK AND SKID FLOOR HIGHEST WEIGHT WHEN WHEN RAISING DERRICK=523K -SKID FLOOR IN WELL POSITION -RAISE PIPE CAT AND MOVE HAUNCH TO RUNNING POSITION 06:30 - 10:00 3.50 RIGU P PRE RIG UP TOPDRIVE AND BLOCKS -BRIDAL DOWN BLOCKS -MATE BLOCKS TO TOPDRIVE ASSIST WITH DENALI CRANE INSPECTIONS ON LIFTING EQUIPMENT Printed 12/1/2014 11:33:23AM • North America-ALASKA-BP • Page 2 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) 10:00 - 16:30 6.50 MOB P PRE ACCEPT RIG AT 10:00 10/30/2014 NIPPLE UP HIGH PRESSURE RISER AND DIVERTER ANNULAR -HOOK UP SURFACE LINES UNDER AND ON RIG FLOOR -ASSIST WITH DENALI CRANE INSPECTIONS ON LIFTING EQUIPMENT -TAKE ON FLUID AND TOTCO PERFOM PIT SENSOR CALIBRATION -RIG UP FLOOR TOOLS AND EQUIPMENT 16:30 - 17:00 i 0.50 MOB P PRE I PERFORM DIVERTER FUNCTION TEST I-KNIFE VALVE CLOSED IN 20 SECONDS -ANNULAR CLOSED IN 38 SECONDS -TEST WITNESS WAIVED BYAOGCC REP JIM REGG 17:00 - 18:00 1.00 MOB P PRE RIG UP FLOW LINE INTERCONNECT -CONNECT FILL UP LINES AND DRAINS ON BOP DECK 18:00 - 19:30 1.50 MOB P PRE HOLD DIVERTER/EVAC DRILL WITH CREW AND PRESPUD MEETING -DRILLER ACUATE E-STOP FOR ,GENERATORS 19:30 - 23:30 4.00 MOB P PRE -PREPARE TO MAKE UP BHA -MAKE UP 6 STANDS OF 4"DP ' -MAKE UP 5 STANDS OF 5"HWDP WITH JARS -PICK UP BIT AND SHORT BHA TOOLS WITH TOOL CRANE 23:30 - 00:00 0.50 MOB P PRE SPOT AND RIG UP HALLIBURTON WIRELINE TRUCK 10/31/2014 00:00 - 01:00 1.00 MOB P PRE PREPARE TO PICK UP BHA -BUILD REMAINING STANDS OF DP AND HWDP -COMPLETE WIRELINE RIG UP WITH GYRO 01:00 - 01:30 0.50 MOB P PRE HOLD DIVERTER/EVAC DRILL AND AAR 01:30 - 03:00 1.50 MOB P PRE PICK UP 12-1/4"DRILLING BHA -MAKE UP 12-1/4"HALLIBURTON QHC1 GRC MILLTOOTH TRI-CONE BIT -8"MUD MOTOR WITH 1.5°BEND STABILIZER,PONY COLLAR,AND UBHO 03:00 - 07:00 4.00 DRILL P SURF I SPUD WELLAND DRILL 12-1/4"SURFACE HOLE FROM 69'MD TO 338'MD -450 GPM, 450 PSI 40 RPM,500 FT/LB TORQUE PU 45K,SO 45K,ROT 45K -GYRO SURVEY EVERY-90 FT -WIPE 30'PRIOR TO CONNECTIONS -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -87 BBL/HR AVERAGE LOSSES Printed 12/1/2014 11:33:23AM North America-ALASKA-BP • Page 3 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date 10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UVVI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Firs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:00 - 09:30 2.50 DRILL N DPRB 338.00 SURF i PULL OUT OF THE HOLE TO SURFACE -PICK UP MWD AND FILTER SCREEN -SCRIBE UBHO TO MOTOR -RACK BACK BHA IN DERRICK FINGER OBSERVED WATER BROACHING TO SURFACE BEHIND ADJACENT WELLHOUSE -MAKE PROPER NOTIFICATIONS AND DISCUSS PLAN FORWARD WITH ODE, DRILLING SUPERINTENDENT,AND WTL. CONTACT AOGCC:MATT HERREIRA,ALASKA CLEAN SEAS SPILL RESPONSE TEAM:FRED CHASE,BP HSE:STEVE BARNESKI,BP ENVIRONMENTAL:BILL FLETCHER,ALASKA DEC:JOHN EBLE _ 09:30 - 15:00 5.50 DRILL N DPRB 338.00 SURF MONITOR WELLAT SURFACE WHILE CONDITIONING MUD -STATIC LOSSES:0 -CONDITION MUD YIELD POINT TO 70-75 -BUILD 2-2OBBL,4OPPB LCM SWEEPS,ONE WITH FINE LCM AND ONE WITH COARSE LCM -DEC AND SRT WERE ON SITE TO EVALUATE THE BROACHING 15:00 - 16:30 1.50 DRILL N DPRB 338.00 SURF MAKE UP MULE SHOE ON BOTTOM OF 4"DP 1AND WASH IN THE HOLE TO 338'MD -100 GPM,20 PSI -NO LOSSES 16:30 - 18:00 1.50 DRILL N DPRB 338..00 SURF PUMP 2-2OBBL,4OPPB,LCM SWEEPS -STAGE UP TO FULL DRILLING RATE AT 500 GPM,100 PSI -DYNAMIC LOSSES WHILE AT FULL DRILLING RATE AFTER PUMPING LCM:3OBBL/HR -NO BROACHING TO SURFACE OBSERVED -STATIC LOSSES:0 18:00 - 19:00 1.00 DRILL N DPRB 338.00 SURF PULL OUT OF THE HOLE FROM 338'MD TO SURFACE -LAY DOWN MULE SHOE -NO LOSSES 19:00 - 20:30 1.50 DRILL N DPRB 338.00 SURF PICK UP BHA AND RUN IN THE HOLE FROM SURFACE TO 338'MD -NO LOSSES 20:30 - 21:30 1.00 DRILL P SURF DRILL 12-1/4"SURFACE HOLE FROM 338'MD TO 373'MD -450 GPM, 730 PSI -40 RPM,500 FT/LB TORQUE -PU 58K,SO 58K,ROT 58K -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -150 BBL/HR LOSSES -OBSERVED WATER BROACHING TO SURFACE BEHIND ADJACENT WELLHOUSE -NOTIFIED BP HSE STEVE BARNESKI AND DISCUSS PLAN FORWARD WITH ODE AND DRILLING SUPERINTENDENT 21:30 - 23:00 1.50 DRILL N DPRB 373.00 SURF PULL OUT OF THE HOLE FROM 373'MD TO SURFACE i-RACK BACK BHA IN DERRICK FINGER • -NO LOSSES 23:00 - 23:30 0.50 DRILL N DPRB 373.00 SURF PERFORM RIG SERVICE I-GREASE TOPDRIVE AND BLOCKS 1-BLOW DOWN TOPDRIVE Printed 12/1/2014 11:33.23AM • North America-ALASKA-BP • Page 4 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28©91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:30 - 00:00 0.50 DRILL N DPRB 373.00 SURF MONITOR WELL ON TRIP TANKS -NO STATIC LOSSES 11/1/2014 00:00 - 03:30 3.50 DRILL N DPRB 373.00 SURF MONITOR WELL ON TRIP TANKS -NO STATIC LOSSES -BUILD 100BBL,4OPPB LCM PILL WITH BAROSEAL COARSE PULL SUCTION AND DISCHARGE SCREENS ON MUD PUMP#1 03:30 - 04:30 1.00 DRILL N DPRB 373.00 SURF TRIP IN THE HOLE FROM SURFACE TO 373' MD -OBTAIN STATIC LOSS RATE 20'OFF BOTTOM:0 BPH -STAGE PUMPS UP TO 450 GPM,85 PSI -OBTAIN DYNAMIC LOSS RATE:48 BPH,WITH MINIMAL BROACHING TO SURFACE -WASH TO BOTTOM 04:30 - 06:00 1.50 DRILL N DPRB 373.00 SURF PUMP 50 BBL,40PPB COARSE LCM PILL -450 GPM,85 PSI -ISOLATE ACTIVE PIT#1 -LOSSES AFTER LCM PILL BACK TO SURFACE:<1 BPH,WITH NO BROACHING TO SURFACE -SPOTTED 50 BBL 40 PPB LCM PILL AT 373' -AND PULLED TO CONDUCTOR SHOE -CLEAR LCM OUT OF DP AND CONDUCTOR AT 450 GPM,80 PSI -PULL OUT OF HOLE TO SURFACE 06:00 - 08:30 2.50 DRILL-- N DPRB 373:00 SURF PICK UP BHAAND RUN IN HOLE TO 373'MD -PJSM FOR PICKING UP BHA -MAKE UP 12.25"DRILLING BHA -SHALLOW TEST MWD TOOLS -WASH DOWN TO 373'MD AT 400 GPM,560 PSI -PU 61K,SO 61K 08:30 - 11:00 2.50 DRILL P SURF DRILL 12-1/4"SURFACE HOLE FROM 373'MD TO 445'MD(445'TVD) -425 GPM,615 PSI ON,525 PSI OFF -50 RPM,OK TORQUE ON,OK TORQUE OFF, WOB 0-3K ,-PU 65K,SO 65K,ROT 62K 1-SURVEY EVERY STAND WITH GYRO -ACTUAL ROTATE TIME=.1 HOURS -ACTUAL SLIDE TIME=.7 HOURS -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT AVERAGE LOSSES TO 400'MD:110 BBLS/HR -AVERAGE LOSSES FROM 400'MD TO 445' MD:400 BBLS/HR -OBSERVED WATER BROACHING TO SURFACE BEHIND N-02 WELLHOUSE AND AROUND RIG'S DUMMY WELLHOUSE SHUT DOWN OPERATIONS AND PREPARE 1 TO POOH -NOTIFY ODE, WTL,DRILLING SUPERINTENDENT,BP HSE:STEVE BARNESKI Printed 12/1/2014 11:33:23AM • North America-ALASKA-BP • Page 5 of 39 � .. )t Operation Summary Report Common Well Name.N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 'X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) — ! (usft) 11:00 - 12:00 1.00 DRILL N DPRB 445.00 SURF PULL OUT OF THE HOLE ON ELEVATORS FROM 445'MD TO SURFACE -MONITOR WELL FOR 10 MINUTES: -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -PU 65K,SO 65KAT 400'MD -TIGHT HOLE AT 440'MD,PULL 50K OVER AND WORK THROUGH STAND BACK BHA 12:00 - 20:00 8.00 DRILL N DPRB 445.00 SURF MONITOR WELL ON TRIP TANK AND WAIT FQR ORDERS -STATIC LOSSES<1 BPH SIMOPS: -CLEAN AND ORGANIZE RIG -SERVICE RIG -PULL SUCTION AND DISCHARGE SCREES OUT OF BOTH MUD PUMPS -REPAIR DERRICKMANS WINCH -REMOVED JETS FROM 12-1/4"USED HUGHES VMD3,MILL TOOTH TRICONE 20:00 - 21:00 1.00 DRILL N DPRB 445.00 SURF MAKE UP MULE SHOE ON 4"DP AND RUN IN THE HOLE ON ELEVATORS TO 441'MD -NO LOSSES -NO DRAG OR INDICATIONS OF FILL WHILE RUNNING IN THE HOLE -RUN GYRO IN HOLE TO SHOOT SURVEYS GYRO TAGGED UP AT 283'MD INSIDE DRILLPIPE -PULLED GYRO OUT OF THE HOLE AND ATTEMPTED TO PUMP TO CLEAR DRILL STRING,STRING PRESSURED UP IMMEDIATELY SIMOPS: -BEGIN MIXING 2-100 BBL,8OPPB LCM "SUPER SWEEPS"PER MUD PROGRAM RECIPE 21:00 - 22:00 1.00 DRILL N DPRB 445.00 SURF PULL OUT OF THE HOLE AND CLEAR DRILLSTRING TO SURFACE -1/4"-1/2"SIZED GRAVEL FOUND IN DRILL STRING -NO LOSSES SIMOPS: -CONTINUE MIXING 2-100 BBL,8OPPB LCM "SUPER SWEEPS"PER MUD PROGRAM RECIPE 22.00 - 23.00 1.00 DRILL N DPRB I 445.00 SURF WASH IN THE HOLE WITH MULE SHOE FROM SURFACE TO 441'MD - 100 GPM,45 PSI -NO FILL OR DRAG OBSERVED -LOST 7BBL WHILE WASHING IN THE HOLE SIMOPS: -CONTINUE MIXING 2-100 BBL,8OPPB LCM "SUPER SWEEPS"PER MUD PROGRAM RECIPE Printed 12/1/2014 11:33:23AM • North America-ALASKA-BP • Page 6 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) _ 23:00 - 23:30 0.50 DRILL N DPRB 445.00 SURF RUN IN HOLE WITH GYRO -SHOOT SURVEYS AT 415'MD,365'MD,AND 315'MD SIMOPS: -CONTINUE MIXING 2-100 BBL,8OPPB LCM "SUPER SWEEPS"PER MUD PROGRAM RECIPE 23:30 - 00:00 0.50 DRILL N DPRB 445.00 SURF PULL OUT OF THE HOLE TO SURFACE -LAY DOWN MULE SHOE SIMOPS: -CONTINUE MIXING 2-100 BBL,8OPPB LCM "SUPER SWEEPS"PER MUD PROGRAM RECIPE 11/2/2014 00:00 -- 05:30 6.50 DRILL N DPRB 445.00 SURF MONITOR WELL ON TRIP TANKS -STATIC LOSSES:0 BPH SIMOPS: -BUILD 12-1/4"CONVENTIONAL DRILLING BHAAND HANG IN ELEVATORS -BUILD 4"DP STANDS OFFLINE -COMPLETE MIXING 2-100 BBL,8OPPB LCM "SUPER SWEEPS"PER MUD PROGRAM RECIPE 05:30 - 07:00 1.50 DRILL N DPRB 445.00 SURF TRIP IN THE HOLE FROM SURFACE TO 445' MD -NO LOSSES WHILE TRIPPING IN THE HOLE -WASHED DOWN LAST 2 STANDS,100 GPM, 40 PSI -TAGGED FILLAT 425'MD 07:00 - 10:00 3.00 DRILL P SURF DRILL 12-1/4"SURFACE HOLE FROM 445'MD TO 600'MD -400 GPM,200 PSI -50 RPM,2K TORQUE ON,1K TORQUE OFF, WOB 10K -PU 61K,SO 60K,ROT 59K -SURVEY WITH GYRO EVERY STAND -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -INITIAL LOSSES=75BPH -PUMPED 5OBBL,8OPPB LCM SWEEP LOSSES SLOWED TO 10BPH -PUMPED 25BBL,8OPPB LCM SWEEP LOSSES STOPPED -DRILLED FROM 550'MD TO 600'MD WITH NO LOSSES Printed 12/1/2014 11:33:23AM 11111 North America-ALASKA-BP Page 7 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date: 10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28©91.00usft(above Mean Sea Level) Date From-To Hrs Task Code I NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 15:30 5.50 DRILL N DPRB 600.00 SURF PULL OUT OF THE HOLE FROM 600'MD TO SURFACE -SPOT 60 BBL PILL ON BOTTOM -PU 62K,SO 60K,ROT 59K -OBSERVED TIGHT SPOT AT 550'MD,STOOD STAND BACK AND PICKED UP SINGLE DUE TO LIMITED MOVEMENT,ATTEMPTED TO TORQUE UP AND SLACK OFF WITH NO SUCCESS,PULL 80K OVER STRING WEIGHT AND JAR UP MULTIPLE TIMES,EVENTUALLY ABLE TO START ROTATING AND WORK PIPE UP 12'WITHOUT CIRCULATION,STAGED ROTARY UP TO 50 RPM AND STAGE PUMPS UP TO 1BPM,STAGED UP RATES TO 100 RPM IAND 400 GPM,WASHED AND REAMED BACK TO BOTTOM AND ATTEMPTED TO PULL OUT OF THE HOLE WITHOUT PUMPS OR ROTARY, BACKREAM OUT OF THE HOLE FROM 600'MD TO 289'MD 15:30 - 16:30 1.00 DRILL N DPRB 600.00 SURF PULL CONVENTIONAL BHA OUT OF THE HOLE FROM 289'MD TO SURFACE LAY DOWN 8"DC'S AND USED BIT 16:30 - 17:00 I 0.50 DRILL SURF RIG SERVICE 17:00 - 19:30 I 2.50 DRILL DPRB 600.00 SURF PICKUP AND MAKE UP DIRECTIONAL BHA OUT OF DERRICK TO 189'MD -DOWNLOAD MWD TOOL -REINSTALL MUD PUMP SUCTION AND DISCHARGE SCREENS 19:30 - 22:00 2.50 DRILL N DPRB 600.00 SURF TRIP IN THE HOLE WITH DIRECTIONAL BHA FROM 189'MD TO 600'MD -WASH DOWN LAST 2 STANDS,400 GPM,550 PSI,15 RPM,1-2K TORQUE TAG FILL AT 575'MD -INITIALLY OBSERVED 24 BBL LOSSES WHILE WASHING DOWN,LOSSES THEN LEVELED OFF TO ZERO 22:00 - 00:00 2.00 DRILL P SURF DRILL 12-1/4"SURFACE HOLE FROM 600'MD TO 707'MD -450 GPM,600 PSI ON,550 PSI OFF -50 RPM,2K TORQUE ON,1K TORQUE OFF, WOB 10K -PU 61K,SO 60K,ROT 59K -SURVEY WITH GYRO EVERY STAND -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -NO LOSSES 11/3/2014 00:00 - 03:00 3.00 DRILL P SURF 1 DRILL 12-1/4"SURFACE HOLE FROM 707'MD TO 860'MD -450 GPM,760 PSI ON,670 PSI OFF -40 RPM,2K TORQUE ON,2K TORQUE OFF, WOB 15K PU 74K,SO 71K,ROT 71K -SURVEY WITH GYRO EVERY STAND -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -NO LOSSES Printed 12/1/2014 11:33:23AM North America-ALASKA-BP • Page 8 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations _ (hr) (usft) 03:00 - 04:00 1.00 DRILL P SURF POOH ON ELEVATORS FROM 860'MD TO 398' MD TO MAKE UP REST OF BHA MONITOR WELL FOR 10 MINUTES:STATIC -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -PU 74K,SO 71K AT 860'MD -TIGHT SPOT AT 830'MD WITH 30K OVERPULL,ATTEMPTED TO WORK PAST WITH NO RESULT.SLOWLY WORKED UP PUMPS TO 400 GPM AND ROTATION TO 30 RPMS UNTIL PAST 04:00 - 04:30 0.50 DRILL P SURF RUN IN ON ELEVATORS TO 860'MD -RIH ON ELEVATORS PICKING UP HEAVYWEIGHT STANDS AND JARS -WASHED DOWN LAST STAND:100 GPM,150 PSI -NO TIGHT SPOTS OR FILL OBSERVED WHILE TRIPPING IN 04:30 - 12:00 7.50 DRILL P SURF DRILL 12-1/4"SURFACE HOLE FROM 860'MD TO 1516'MD(1.515'TVD) -500 GPM,1290 PSI ON,1090 PSI OFF -70 RPM,3-5K TORQUE ON,2K TORQUE OFF, WOB 20K -PU 90K,SO 84K,ROT 87K SURVEY EVERY STAND -RIG DOWN GYRO -ACTUAL ROTATE TIME=2.8 HRS,ACTUAL SLIDE TIME=3.3 HRS -JAR HOURS=7.2 HRS -BACKREAM 30'PRIOR TO CONNECTIONS -MUD WEIGHT:8.8 PPG IN,8.8 PPG OUT -NO LOSSES 12:00 - 17:30 5.50 DRILL P SURF DRILL 12-1/4"SURFACE HOLE FROM 1516'MD TO 2081'MD(2044'TVD) -500 GPM,1150 PSI ON,1240 PSI OFF -60 RPM,4K TORQUE ON,2-3K TORQUE OFF, WOB 18K -PU 101K,SO 88K,ROT 92K -SURVEY EVERY STAND -BACKREAM 30'PRIOR TO CONNECTIONS -MUD WEIGHT:8.9 PPG IN,8.9 PPG OUT -NO LOSSES 17:30 - 18:00 0.50 DRILL P SURF CIRCULATE HOLE CLEAN -500 GPM,1150 PSI -60 RPM,2K TORQUE -CIRCULATE WHILE RACKING BACK THREE _ STANDS FROM 2081'MD TO 1800'MD 18:00 - 19:30 1.50 DRILL P SURF POOH ON ELEVATORS FROM 1800'MD TO 700'MD -MONITOR WELL FOR 10 MINUTES:STATIC -PU 95K,SO 90K AT 1800'MD -NO ISSUE PULLING OUT OF THE HOLE 19:30 - 20:30 1.00 DRILL P SURF RIH WITH 12-1/4"DRILLING BHA FROM 700' MD TO 2081'MD -RIH ON ELEVATORS PICKING UP 4"STANDS • FROM DERRICK -NO TIGHT SPOTS OR FILL ENCOUNTERED WHILE TRIPPING IN Printed 12/1/2014 11:33:23AM North America-ALASKA-BP • Page 9 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) _ 20:30 - 00:00 3.50 DRILL P SURF DRILL 12-1/4"SURFACE HOLE FROM 2081'MD TO 2460'MD(2353'TVD) -500 GPM,1660 PSI ON,1553 PSI OFF -70 RPM,4K TORQUE ON,3K TORQUE OFF, WOB 10K -PU 109K,SO 91K,ROT 94K -SURVEY EVERY STAND ACTUAL ROTATE TIME=5.3 HRS,ACTUAL SLIDE TIME=1.2 HRS JAR HOURS=13.7 HRS -BACKREAM 30'PRIOR TO CONNECTIONS -MUD WEIGHT:9.0 PPG IN,9.0 PPG OUT -NO LOSSES 11/4/2014 00:00 - 06:00 6.00 DRILL P SURF DRILL 12-1/4"SURFACE HOLE FROM 2460'MD TO 3125'MD(3051'TVD) -525 GPM,1890 PSI ON,1800 PSI OFF -70 RPM,5K TORQUE ON,3K TORQUE OFF, WOB 20K -PU 120K,SO 98K,ROT 108K -SURVEY EVERY STAND -BACKREAM 30'PRIOR TO CONNECTIONS -MUD WEIGHT:9.0 PPG IN,9.1 PPG OUT 06:00 - 07:30 1.50 DRILL P SURF DRILL 12-1/4"SURFACE HOLE FROM 3125'MD TO 3185'MD(3108'TVD) -550 GPM,1950 PSI ON,1825 PSI OFF -70 RPM,5K TORQUE ON,3K TORQUE OFF, WOB 20K -PU 121K,SO 98K,ROT 108K -SURVEY EVERY STAND -BACKREAM 30'PRIOR TO CONNECTIONS -MUD WEIGHT:9.0 PPG IN,9.1 PPG OUT -ACTUAL ROTATE TIME=4.6 HRS -ACTUAL SLIDE TIME=0.3 HRS -JAR HOURS=18.6 HRS TD 12-1/4"SURFACE HOLE 123'BELOW THE TSV3 AS PICKED PER RIG GEOLOGIST. 07:30 - 08:30 1.00 DRILL P SURF CIRCULATE HOLE CLEAN PRIOR TO SHORT TRIP TO THE BASE OF THE PERMAFROST -CIRCULATE 3 BOTTOMS UP -550 GPM,1775 PSI 1-70 RPM,3K TORQUE '-RACK ONE STAND BACK AT EACH BOTTOMS UP. 08:30 - 11:00 2.50 DRILL P SURF SHORT TRIP TO 2 STANDS ABOVE THE BASE OF THE PERMAFROST ON ELEVATORS;FROM 3030'MD TO 1802'MD. !-MONITOR THE WELL PRIOR TO COMING OFF BOTTOM-STATIC -PU 120K;SO 97K @ 2841'MD -ENCOUNTERED TIGHT HOLE AT 2630'MD; 30K OVERPULL ,-RAN IN 2 STANDS AND PUMPED 1 BOTTOMS !UP -550 GPM;1660 PSI -70 RPM;1K TORQUE -CONTINUE TO PULL OUT OF THE HOLE ON ELEVATORS TO 1802'MD. !-DID NOT ENCOUNTER ANY MORE TIGHT 'HOLE. -_-_.-.. . . . -PU 103K;SO 84K @ 1802'MD. Printed 12/1/2014 11:33:23AM North America-ALASKA-BP • Page 10 of 39 Operation Summary Report Common Well Name N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 12:00 1.00 DRILL P SURF RUN IN THE HOLE ON ELEVATORS TO TD; FROM 1802'MD TO 3185 MD PU 117K;SO 95K @ 3185'MD. -NO SIGNS OF TIGHT HOLE -NO SIGNS OF FILL ON BOTTOM. 12:00 - 14:00 2.00 DRILL P SURF CIRCULATE 3 BOTTOMS UP AT TD. -550 GPM,1800 PSI -80 RPM,3K TORQUE -RACK ONE STAND BACK EVERY 20 MIN. -HOLE CLEANED UP AFTER 1.5 BOTTOMS UP. 14:00, - 17:30 3.50 DRILL P SURF PULL OUT OF THE HOLE ON ELEVATORS FROM 2841'MD TO TOP OF BHA AT 450'MD. RUN BACK IN FROM 450'TO 850'TO PROACTIVELY WIPE UPPER SECTION OF THE HOLE-NO ISSUES NOTED. -PU 122K @ 2841'MD. -NO OVERPULLS NOTED. 17:30 - 20:00 2.50 DRILL P SURF PULL OUT OF THE HOLE AND LAY DOWN 12-1/4"DRILLING BHA. STAND BACK 5"HWDP AND JAR STAND. -LAY DOWN MWD AND MOTOR TO PIPE SHED. _BIT:2-3-W T-A-E-I-N O-T D 20:00 - 20:30 0.50 DRILL P SURF CLEAN AND CLEAR RIG FLOOR 20:30 - 21:00 0.50 DRILL P SURF SERVICE TOP DRIVE AND RIG FLOOR EQUIPMENT. 21:00 - 00:00 3.00 DRILL P SURF RIG UP TO RUN 9-5/8",47#,L-80,HYD563 SURFACE CASING. -CHANGE OUT BALES AND ELEVATORS -MAKE UP VOLANT TOOL -RIG UP AND FUNCTION TEST CASING TONGS -RIG UP FILL UP LINE -INSTALL PS-21 SLIPS WITH 9-5/8"SLIP INSERTS. Printed 12/1/2014 11:33:23AM • North America-ALASKA-BP • Page 11 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 t 91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11/5/2014 00:00 - 07:30 7.50 CASING P SURF RUN IN THE HOLE WITH 9-5/8";47#,L-80, HYD563 SURFACE CASING TO PLANNED LANDING DEPTH AT 3176'MD,3100'TVD. -PICK UP AND BAKERLOK SHOE TRACK -CHECK FLOATS;FLOATS HELD -USE JET LUBE SEAL GUARD PIPE DOPE -TORQUE CONNECTIONS TO 15,800 FT-LBS RUN 29 CENTRALIZERS,32 STOP RINGS. -1 CENTRALIZER LOCKED DOWN 5'FROM PIN ON JT 1 W/2 STOP RINGS. -1 CENTRALIZER LOCKED DOWN MID-JT ON JT 2 W/2 STOP RINGS. -25 FREE FLOATING CENTRALIZERS ON JTS 3-27 W/STOP RINGS 5'FROM PIN. -2 CENTRALIZERS LOCKED DOWN W/2 STOP RINGS ON THE TAM PORT COLLAR PUP JTS -BREAK CIRCULATION EVERY 10 JOINTS AT 2 BPM FOR-5 MIN. -FILL CASING EVERY JOINT WITH FILL UP HOSE. -MUD WEIGHT IN/OUT 9.1 PPG RUN IN THE HOLE AT 40 FT/MIN FROM 800' MD TO 1600'MD 12 BBL LOSSES OBSERVED WHILE RUNNING CASING. -REDUCED RUNNING SPEED TO 20 FT/MIN FROM 1600'MD TO 3125'MD. -NO HOLE ISSUES ENCOUNTERED. -FINAL PICKUP WEIGHT=185 KLBS, SLACKOFF=121 KLBS. -PICK UP MANDREL HANGER AND LANDING JOINT AND WASH LAST 10'AT 1 BPM. -TAGGED LANDING RING WITH NO SIGNS OF FILL ON BOTTOM. -SEE ATTACHED EXCEL TALLY Printed 12/1/2014 11 33:23AM North America-ALASKA BP x • Page 12 of 39 Operation Summary Report ' Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 t 91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:30 - 14:00 6.50 CASING P SURF CIRCULATE HOLE CLEAN AND CONDITION MUD FOR CEMENTING WITH 17 BOTTOMS UP. -STAGE UP PUMPS IN 1 BPM INCREMENTS FROM 1 BPM TO FINAL 10 BPM. -@ 2 BPM;220 PSI,27%RETURN FLOW -@ 3 BPM;200 PSI,40%RETURN FLOW -@ 4 BPM;200 PSI,50%RETURN FLOW -@ 5 BPM;210 PSI,45%RETURN FLOW -@ 6 BPM;240 PSI,45%RETURN FLOW -( 7 BPM;265 PSI,45%RETURN FLOW -@ 8 BPM;290 PSI,42%RETURN FLOW -@ 9 BPM;280 PSI,32%RETURN FLOW -@ 10 BPM;285 PSI,20%RETURN FLOW -RECIPROCATE PIPE 15'STROKES,LANDING ON RING EACH TIME. -THIN MUD BACK TO 18 YP DURING FINAL 2 CIRCULATIONS AFTER CEMENT TESTING COMPLETE. MW IN/OUT=9.1 PPG -ICP AT 10 BPM=285 PSI,FCP=175 PSI. -NO LOSSES OBSERVED WHILE CIRCULATING OFFLOAD AND PREPARE PITS FOR CEMENTING MIRU SLB CEMENTERS. BATCH UP MUD PUSH AND PRESSURE TEST LINES WITH WATER TO 250 PSI LOW AND 4000 PSI HIGH FOR 5 MIN EACH(LEAK TIGHT CRITERIA, PASS). Printed 12/1/2014 11:33:23AM • North America-ALASKA-BP • Page 13 of 39 Operation Summary Report .._........ Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) i Start Date:10/29/2014 End Date: 11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28©91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase 1 Description of Operations (hr) (usft) 14:00 - 18:30 4.50 CEMT P SURF CEMENT 9-5/8"SURFACE CASING AS FOLLOWS: -PUMP 100 BBLS OF 10.0 PPG MUDPUSH II SPACER @ 5 BPM,209 PSI -DROP BOTTOM PLUG -PUMP 575 BBLS OF 11.0 PPG LITECRETE LEAD CEMENT @ 5 BPM,455 PSI, PERMAFROST EXCESS VOLUME 400%(YIELD 1.91 CU.FT/SK-1691 SX PUMPED) -RECIPROCATE PIPE 15'STROKES AT SURFACE WHILE PUMPING CEMENT 2 GAL OF RED DYE IN THE FIRST TUB. -INDICATIONS OF MUDPUSH AT 380 BBLS AWAY -INCREASE IN DRAG WHILE RECIPROCATING -PARKED ON LANDING RING AT END OF LEAD -SIGNS OF CEMENT IN RETURNS AT 500 BBLS AWAY -PUMP 61 BBLS OF 15.8 PPG CLASS G TAIL 5 BPM,EXCESS VOLUME 40% (YIELD 1.16 CU.FT/SK-327 SX PUMPED) -GOOD CEMENT BACK TO SURFACE 50 BBLS INTO TAIL. -DROP TOP PLUG AND KICKED OUT WITH 10 BBLS OF WATER FROM SLB. PERFORM DISPLACEMENT WITH RIG PUMPS AND 9.1 PPG MUD PER SLB CADE -120 BBLS DISPLACED AT 10 BPM:ICP 520 PSI 14%RETURN FLOW,FCP 600 PSI 14% RETURN FLOW -90 BBLS DISPLACED AT 7 BPM:ICP 360 PSI 12%RETURN FLOW,FCP 900 PSI 11% RETURN FLOW -REDUCE RATE TO 2 BPM PRIOR TO PLUG BUMP:FINAL CIRCULATING PRESSURE 665 PSI -BUMP PLUG AND INCREASE PRESSURE TO 1150 PSI AND HELD FOR 5 MIN,CHECK FLOATS-GOOD -TOTAL DISPLACEMENT VOLUME BY RIG 217 BBLS(MEASURED BY STROKES @ 96%PUMP EFFICIENCY) -240 BBLS OF CEMENT RETURNS TO SURFACE -NO LOSSES NOTED DURING CEMENT JOB I-CEMENT IN PLACE AT 18:15 18:30 - 21:00 2.50 CEMT P SURF 1 RIG DOWN CEMENT EQUIPMENT AND CASING RUNNING EQUIPMENT. -DRAIN RISER AND FLUSH WITH RETARDANT PILL -BACK OUT AND LAY DOWN LANDING JOINT -RIG DOWN BALE EXTENSIONS,VOLANT TOOL AND CASING TONGS -FLUSH FLOWLINE,JET LINES AND POSSUM BELLY Printed 12/1/2014 11:33:23AM • North America-ALASKA-BP • Page 14 of 39 Operation Summary Report Common Well Name.N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/ 1/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date I From-To Hrs I Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:00 - 00:00 3.00 CEMT P SURF NIPPLE DOWN RISERS AND DIVERTER -FLUSH OUT FLOW BOX AND PULL UPPER RISER -PRESSURE WASH INSIDE OF DIVERTER ANNULAR -NIPPLE DOWN DIVERTER ANNULAR AND SETBACK ON CART NIPPLE DOWN LOWER RISER ASSEMBLIES -NIPPLE DOWN KNIFE VALVE ASSEMBLY AND REMOVE FROM WELLHOUSE -OFFLOAD 9.1 PPG MAXDRIL-N MUD FROM PITS. 11/6/2014 00 00 - 00:30 0.50 WHSUR P SURF SAFETY MEETING WITH RIG CREW TO REVIEW DROPPED OBJECTS -REVIEWED RECENT INCIDENT THAT OCCURRED IN FIELD -REVIEWED"BACK TO WORK PLAN"AND DISCUSSED SHORT-TERM AND LONG-TERM PLAN -DEMONSTRATED AND INSTRUCTED CREW IN PROPER USAGE OF ID AND OD CALIPERS -DISCUSSED EXCLUSION ZONES WHEN PICKING UP TUBULARS ON RIG FLOOR AND IN PIPE SHED. -CLEAN OUT PITS 00:30 - 03 30 3.00 WHSURP SURF NIPPLE UP 11"FMC THROUGH BORE GEN 5 WELL HEAD SYSTEM. -MOBILIZE WELLHEAD FROM BOP DECK TO WELL HOUSE -ORIENT AND NIPPLE UP WELL HEAD -PRESSURE TEST CASING NECK SEAL TO 1000 PSI FOR 30 MIN-GOOD TEST -WSL VERIFIED LOCKDOWNS IDENTIFIED AND MARKED -CONTINUE TO CLEAN OUT PITS. 03:30 - 08:30 5.00 BOPSUR P SURF NIPPLE UP LOWER RISER,BOP STACK AND UPPER RISER. I-LOWER RISERS AND NIPPLE UP ONTO WELLHEAD. -PICK BOPE STACK WITH 13-5/8"ANNULAR, 7"UPPER RAMS AND 2-7/8"X 5-1/2"LOWER VARIABLE BORE RAMS. -FILLAND DRAIN LINES -CHARGE ACCUMULATOR -INSTALL MOUSE HOLES -RIG UP BOPE TEST EQUIPMENT -MAKE UP 4"VALVE ASSEMBLY -CONTINUE TO CLEAN OUT PITS. 08:30 - 09:30 1.00 CASING P SURF RIG UP TO TEST BOPE. SET TEST PLUG AND RUN IN HOLE WITH FIRST TEST JOINT. 09:30 - 12:00 2.50 BOPSUR C SURF PREP FOR BOPE HYDRAULIC CHAMBER PRESSURE TESTS -DEVELOP WSP WITH NOV TECH AND PARKER HYDRAULIC MECHANIC -RIG UP TEST MANIFOLD FOR PRESSURE TESING HYDRAULIC CHAMBERS Printed 12/1/2014 11:33:23AM • North America-ALASKA-BP • Page 15 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date: 11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28©91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 19:00 7.00 BOPSUR P SURF PRESSURE TEST BOPE; TEST UPPER AND LOWER RAMS TO 250 PSI LOW,4000 PSI HIGH FOR 5 MINUTES EACH -TEST UPPER RAMS WITH 7"TEST JOINT -TEST LOWER RAMS WITH 2-7/8"AND 5-1/2" TEST JOINTS TEST ANNULAR TO 250 LOW,3500 PSI HIGH FOR 5 MINUTES EACH -TEST ANNULAR WITH 2-7/8"TEST JOINT -ALL TESTS CHARTED,SEE ATTACHED BOP TEST CHARTS -TEST RAM LOCKS ON BLINDS,UPPER 7" RAMS,LOWER RAMS(2-7/8"AND 5-1/2")- PASS -TEST WITNESS WAIVED BYAOGCC REP 1 JOHNNIE HILL -PERFORM HYDRAULIC CHAMBER(OPEN AND CLOSE)TEST ON ALL RAMS,ANNULAR AND HCR VALVES TO 1500 PSI. TEST TOOK APPROXIMATELY 3.5 HOURS • LONGER THAN STANDARD BOPE TEST WITH 3 TEST JOINTS DUE TO TESTING ALL HYDRAULIC OPEN AND CLOSE CHAMBERS -AND TESTING RAM LOCKS. NOV FIELD REPRESENTATIVE ONSITE TO ASSIST WITH TESTING HYDRAULIC CHAMBERS AND RAM LOCKS IN ACCORDANCE WITH NOV RECOMMENDED PROCEDURES. (TIME ACCOUNTED FOR IN NEXT 3.5 HR NPT ENTRY) 19:00 - 22:30 3.50 BOPSUR C SURF TIME ASSOCIATED WITH TESTING CHAMBERS AND RAM LOCKS DURING ROPE TESTING. 22:30 - 23:00 0.50 WHSUR P SURF PULL TEST PLUG(DRIFT STACK)AND INSTALL 9.938"ID WEAR RING -WSL VERIFIED(4)LOCKDOWNS RUN IN AND GLAND NUTS TORQUED. 23:00 - 23:30 0.50 CASING P SURF SAFETY MEETING WITH RIG CREW TO REVIEW DROPPED OBJECTS -REVIEWED RECENT INCIDENT THAT OCCURRED IN FIELD -REVIEWED"BACK TO WORK PLAN"AND DISCUSSED SHORT-TERM AND LONG-TERM PLAN -DEMONSTRATED AND INSTRUCTED CREW IN PROPER USAGE OF ID AND OD CALIPERS -DISCUSSED EXCLUSION ZONES WHEN PICKING UP TUBULARS ON RIG FLOOR AND IN PIPE SHED. 23:30 - 00:00 0.50 CASING P SURF PRESSURE TEST 9-5/8"SURFACE CASING -TEST COMPLETED ON 11/7/14. SEE NOTES IN NEXT TIME INTERVAL. Printed 12/1/2014 11.33:23AM • North America-ALASKA-BP Page 16 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28©91.0ousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11/7/2014 00 00 - 00:30 0.50 CASING P SURF CONTINUE 9-5/8"SURFACE CASING PRESSURE TEST. -250 PSI LOW FOR 5 MIN AND 3500 PSI HIGH FOR 45 MIN. -MUD WEIGHT:9.1 PPG -PUMPED 5 BBLS TO PRESSURE UP TO 3500 PSI.BLED BACK 5 BBLS. -TEST MET BP PRESSURE TESTING CRITERIA: -LOST 0 PSI FROM 0 MIN TO 15 MIN -LOST 25 PSI FROM 15 MIN TO 30 MIN -LOST 5 PSI FROM 30 MIN TO 45 MIN DISCUSSED RESULTS WITH WTLAND RECEIVED AUTHORIZATION TO PROCEED. 00:30 - 01:30 1.00 CASING P SURF RIG DOWN TEST EQUIPMENT AND BLOW DOWN ALL LINES 01:30 - 02:30 1.00 CASING P SURF RIG UP TO PICK UP 8-1/2"ROTARY STEERABLE DRILLING ASSEMBLY. -CHANGE OUT BALES ON TOP DRIVE -INSTALL AND RIG UP BX ELEVATORS. CALIPER ELEVATORS. -MOBILIZE BIT AND BHA COMPONENTS TO RIG FLOOR 02:30 - 06:00 3.50 CASING P SURF PICK UP 8-1/2"DRILLING ASSEMBLY PER BAKER DIRECTIONAL DRILLER FROM SURFACE TO 708'MD. -8-1/2"HYCALOG DSHI616M-D6 PDC BIT -6-3/4"AUTOTRAK RSS;WITH ONTRACK MWD(GR/RES/PWDNSS/SURVEY) -SHALLOW HOLE TEST AT 1180'MD(PASS) 06:00 - 08:30 2.50 CASING P SURF CHANGE OUT SAVER SUB ON TOP DRIVE. 08:30 - 10:30 2.00 CASING P SURF TRIP IN HOLE WITH 8-1/2"DRILLING ASSEMBLY FROM BHA AT 708'MD TO 2978' MD -PERFORM UNANNOUNCED KWr(D1)DRILL WITH BOPE FAILURE COMPLICATION AND HOLD AAR 10:30 - 11:30 1.00 CASING P SURF WASH DOWN WITH 8-1/2"DRILLING ASSEMBLY FROM 2978'MD TO TAG CEMENT PLUGS ON DEPTH AT 3099'MD. _-500 GPM,1450-1500 PSI,60 RPM,3 KFT-LBS 11:30 - 12:00 0.50 CASING P SURF DRILL OUT CEMENT IN SHOE TRACK FROM FLOAT COLLAR AT 3099'MD TO 3166'MD(10' ABOVE FLOAT SHOE). -500 GPM,1500-1600 PSI,75 RPM,3-4 KFT-LBS 12:00 - 13:30 1.50 CASING P SURF DISPLACE WELL FROM 9.1 PPG MAXDRIL-N TO NEW 9.5 PPG LSND. -100 RPM,3 KFT-LBS, 550 GPM,1450-1600 PSI,RECIPROCATING PIPE 13:30 - 14:30 1.00 CASING P SURF DRILL OUT REMAINING SHOE TRACK FROM 3166'MD+RATHOLE+20'NEW FORMATION TO 3205'MD. -550 GPM,1475 PSI,10-12 KLBS, 110 RPM,3-4 KFT-LBS Printed 12/1/2014 11:33:23AM North America-ALASKA-BP • Page 17 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28©91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) 14:30 - 15:00 0.50 CASING P SURF CIRCULATE BOTTOMS UP, FLOWCHECK WELL FOR 10 MIN AFTER CIRCULATING (STATIC) -600 GPM,1665 PSI -ESTABLISHED ECD BASELINE PRIOR TO DRILLING AHEAD. -10.0 PPG. 15:00 - 16:00 1.00 DRILL P INTI PERFORM LOT TO 13.5 PPG EMW. MUD WEIGHT:9.5 PPG,3100'TVD,3176'MD, 660 PSI SURFACE PRESSURE BREAKOVER -PUMP 1.4 BBLS TO 795 TOTAL PSI,BLEED BACK 0.6 BBLS,HOLE VOLUME=209 BBL -PUMP WITH MP#1,SHUT IN WITH ANNULAR PREVENTER 1-PRESSURE BLED OFF FROM 795 PSI TO 354 PSI IN 10 MIN -TEST SATISFIES REQUIREMENTS FOR 50 BBL KICK TOLERANCE. CONSULT WITH ODE PRIOR TO PROCEEDING ON WITH — — OPERATIONS. 16:00 - 16:30 0.50 DRILL P - INTI SERVICE AND LUBRICATE RIG WHILE CONFIRMING LOT RESULTS WITH ANCHORAGE TEAM. Printed 12/1/2014 11:33:23AM • North America-ALASKA-BP • Page 1a of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:OOAM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:30 - 00:00 7.50 DRILL P INTI DIRECTIONAL DRILL 8-1/2"INTERMEDIATE HOLE FROM 3205'MD TO 3810'MD(3691'TVD) (605 IN 7.5 HRS=80.7 FPH). -600 GPM,1900 PSI ON/OFF -180 RPM,3K TORQUE ON,2K TORQUE OFF, WOB 10K -PU 117K,SO 97K,ROT 103K -ECD:ACTUAL 10.4 PPG,CALCULATED 10.2 PPG SURVEY EVERY 94' ACTUAL ROTATE TIME=2.6 HRS JAR HOURS(CUMULATIVE)=21.2 HRS -MUD WEIGHT:9.5 PPG IN,9.5 PPG OUT -INSTANTANEOUS ROP 300 FPH NO BACKREAMING AT CONNECTIONS -TOP OF SV2©3251'MD,3172'TVD(3081' TVDSS) -AVE ROP 117.5 FPH(INCLUDING CONNECTIONS)THROUGH SV2 -TOP OF SV1 @ 3588'MD,3491'TVD(3400' TVDSS) -ROP FELL OFF AND UNABLE TO MAKE ANY PROGRESS AT 21:45 HRS(3794'MD) -ATTEMPT TO PICK UP AND RESEAT BIT -VARYING PARAMETERS:80-180 RPM, 2-25K WOB,500-600 GPM -UNABLE TO MAKE PROGRESS; PRESSURE SPIKES WITH INCREASE IN WOB. -RETRACT RIBS ON AUTOTRACK AND ATTEMPT TO WORK THROUGH. -UNABLE TO MAKE PROGRESS; PRESSURE SPIKES WITH INCREASE IN WOB. -DETERMINE BIT BALLING IS ISSUE AT 23:00 HRS -WORK STAND WHILE MIXING UP 40 BBL 3.2%DRIL-N-SLIDE PILL -BEGIN ADDING 3 PPB MEDIUM WALNUT TO ACTIVE SYSTEM -PUMP 40 BBL 3.2%DRIL-N-SLIDE PILL AT 23:40 HRS -BIT BALLING CLEARED UP -ABLE TO GET ON BOTTOM DRILLING W/O PRESSURE SPIKES -AVE ROP 78.5 FPH(INCLUDING CONNECTIONS AND TIME CLEANING BIT) THROUGH SV1 SLOW PUMP RATES:3740'MD,3628'TVD, MUD WEIGHT 9.5 PPG MP#1:SPM 30/40;PSI 180/240 MP#2:SPM 30/40;PSI 180/240 Printed 12/1/2014 11:33:23AM North America-ALASKA-BP Page 19 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11/8/2014 00:00 - 06:00 6.00 DRILL P INTI DIRECTIONAL DRILL 8-1/2"INTERMEDIATE HOLE FROM 3810'MD TO 4687'MD(4339'TVD) (877'IN 6.0 HRS=146.1 FPH). 600 GPM,2550 PSI ON,2380 PSI OFF -180 RPM,5-8K TORQUE ON,2-3K TORQUE OFF,WOB 7-15K -PU 130K,SO 102K,ROT 105K -ECD:ACTUAL 10.8 PPG,CALCULATED 10.05 PPG -SURVEY EVERY 94' MUD WEIGHT:9.5 PPG IN,9.5 PPG OUT -INSTANTANEOUS ROP 300 FPH -NO BACKREAMING AT CONNECTIONS PUMPED 35 BBL HI-VIS SWEEP AT 4600'MD -MODERATE INCREASE IN CUTTING OBSERVED -TOP OF UG4 @ 4071'MD,3911'TVD(3820' TVDSS) -AVE ROP 184 FPH(INCLUDING CONNECTIONS)THROUGH UG4 TOP OF UG4A @ 4117'MD,3947'TVD(3856' TVDSS) -AVE ROP 147.1 FPH(INCLUDING CONNECTIONS)THROUGH UG4A SLOW PUMP RATES:4210'MD,4017'TVD, MUD WEIGHT 9.5 PPG MP#1:SPM 30/40;PSI 185/255 MP#2:SPM 30/40;PSI 185/255 Printed 12/1/2014 11:33:23AM • North America-ALASKA-BP • Page 20 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Firs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2:00 6.00 DRILL P INTI DIRECTIONAL DRILL 8-1/2"INTERMEDIATE HOLE FROM 4687'MD TO 5349'MD(4870'TVD) (662'IN 6.0 HRS=110.3 FPH). 600 GPM,2485 PSI ON,2450 PSI OFF 180 RPM,6K TORQUE ON,3K TORQUE OFF, WOB 15K -PU 138K,SO 106K,ROT 116K ECD:ACTUAL 10.54 PPG,CALCULATED 10.06 PPG j-SURVEY EVERY 94' MUD WEIGHT:9.5 PPG IN,9.5 PPG OUT INSTANTANEOUS ROP 250 FPH -NO BACKREAMING AT CONNECTIONS TOP OF UG3 @ 4438'MD,4191'TVD(4100' TVDSS) -AVE ROP 127.2 FPH(INCLUDING CONNECTIONS)THROUGH UG3 -TOP OF UG1 @ 5123'MD,4703'TVD(4612' TVDSS) -AVE ROP 130 FPH(INCLUDING "CONNECTIONS)THROUGH UG1 PUMPED 35 BBL HI-VIS SWEEP AT 5160'MD -MODERATE INCREASE IN CUTTING .OBSERVED STOP ADDING BACKGROUND NUTPLUGAT 5800'MD SLOW PUMP RATES:4777'MD,4444'TVD, MUD WEIGHT 9.5 PPG MP#1:SPM 30/40;PSI 200/278 MP#2:SPM 30/40;PSI 201/275 SLOW PUMP RATES:5250'MD,4798'TVD, MUD WEIGHT 9.5 PPG MP#1:SPM 30/40;PSI 210/290 MP#2:SPM 30/40;PSI 205/285 Printed 12/1/2014 11:33:23AM North America-ALASKA-BP I Page 21 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C.(7,637,969.00) Project.Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor.PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 18:00 6.00 DRILL P INTI DIRECTIONAL DRILL 8-1/2'INTERMEDIATE HOLE FROM 5349'MD TO 6075'MD(5411'TVD) (726'IN 6.0 HRS=121 FPH). -600 GPM,2630 PSI ON,2650 PSI OFF 1-180 RPM,5K TORQUE ON,4K TORQUE OFF, WOB 15K PU 151K,SO 112K,ROT 122K ECD:ACTUAL 10.54 PPG,CALCULATED 10.06 PPG -SURVEY EVERY 94' MUD WEIGHT:9.5 PPG IN,9.5 PPG OUT -INSTANTANEOUS ROP 250 FPH -NO BACKREAMING AT CONNECTIONS PUMPED 35 BBL HI-VIS SWEEP AT 5450'MD -MINIMAL INCREASE IN CUTTING OBSERVED -TOP OF WS2 @ 5771'MD,5187'TVD(5096' TVDSS) -AVE ROP 102.2 FPH(INCLUDING CONNECTIONS)THROUGH WS2 PUMPED 35 BBL WEIGHTED SWEEP(1.5 PPG OVER MW)AT 5809'MD -MODERATE INCREASE IN CUTTING OBSERVED TOP OF WS1 @ 6023'MD,5373'TVD(5282' TVDSS) -AVE ROP 131.5 FPH(INCLUDING CONNECTIONS)THROUGH WS1 SLOW PUMP RATES:5820'MD,5222'TVD, MUD WEIGHT 9.5 PPG MP#1:SPM 30/40;PSI 240/330 MP#2:SPM 30/40;PSI 240/330 18:00 - 18:30 0.50 DRILL P INTI SERVICE TOPDRIVE AND RIG FLOOR EQUIPMENT Printed 12/1/2014 11:33:23AM IIINorth America-ALASKA-BP Page 22 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 IX3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28©91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:30 - 00:00 5.50 DRILL P INTI DIRECTIONAL DRILL 8-1/2"INTERMEDIATE HOLE FROM 6075'MD TO 6705'MD(5882'TVD) (630'IN 5.5 HRS=114.5 FPH). -600 GPM,3200 PSI ON,3010 PSI OFF 180 RPM,5-9K TORQUE ON,4-5K TORQUE OFF,WOB 14K -PU 162K,SO 117K,ROT 125K ECD:ACTUAL 10.9 PPG,CALCULATED 10.15 PPG -SURVEY EVERY 94' -MUD WEIGHT:9.8 PPG IN,9.8 PPG OUT INSTANTANEOUS ROP 250 FPH -NO BACKREAMING AT CONNECTIONS -ACTUAL DAILY ROTATE TIME 15.4 HRS -JAR HOURS(CUMULATIVE)=36.6 HRS PUMPED 35 BBL WEIGHTED SWEEP(1.5 PPG OVER MW)AT 6099'MD -MODERATE INCREASE IN CUTTING OBSERVED -TOP OF CM3 @ 6251'MD,5542'TVD(5451' TVDSS) -AVE ROP 70.8 FPH(INCLUDING CONNECTIONS)THROUGH CM3 PUMPED 35 BBL WEIGHTED SWEEP(1.5 PPG OVER MW)AT 6287'MD -MODERATE INCREASE IN CUTTING OBSERVED SLOW PUMP RATES:6705'MD,5882'TVD, MUD WEIGHT 9.8 PPG MP#1:SPM 30/40;PSI 226/327 MP#2:SPM 30/40;PSI 229/328 11/9/2014 00:00 - 06:30 6.50 DRILL P INTI DIRECTIONAL DRILL 8-1/2"INTERMEDIATE HOLE FROM 6705'MD TO 7243'MD(6285'TVD) (538'IN 6.5 HRS=83 FPH). -550 GPM,3150 PSI ON,3020 PSI OFF -150 RPM,6-9K TORQUE ON,6K TORQUE OFF,WOB 13-15K -PU 166K,SO 119K,ROT 130K -ECD:ACTUAL 11.5-11.7 PPG,CALCULATED 10.7 PPG -SURVEY EVERY STAND -MUD WEIGHT:10.2 PPG IN,10.2 PPG OUT -INSTANTANEOUS ROP 200 FPH -NO BACKREAMING AT CONNECTIONS -CIRCULATE ON BOTTOM 5 MIN PRIOR TO CONNECTIONS -FROM 6800'MD TO 7100'MD: -WEIGHT UP SYSTEM WITH SACK BAR FROM 9.8 PPG TO 10.2 PPG Printed 12/1/2014 11:33:23AM • North America-ALASKA-BP Page 23 of 39 Operation Summary Report Common Wet Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 , End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) _ 06:30 - 09:00 2.50 DRILL P INTI CIRCULATE HOLE CLEAN WITH 5 BOTTOMS UP FOR ECD MANAGEMENT. -550 GPM,3000 PSI,150 RPM,5 KFT-LBS TORQUE. RECIPROCATE(2)FULL STANDS. -PUMP(1)30 BBL HI-VIS SWEEP WITH MINIMAL RESPONSE. PUMP(1)20 BBL 11.8 PPG WEIGHTED SWEEP WITH MINIMAL RESPONSE. -ECD IMPROVES FROM 11.7 PPG TO 11.3 PPG DURING CIRCULATING -DECISION TO CIRCULATE BECAUSE UNABLE TO LOWER ROP ADEQUATELY TO HELP ECD WHILE DRILLING(WANT TO KEEP ROP AT 125-150 FPI-,FOR RSS RESPONSE). 09:00 - 12:00 3.00 DRILL P INTI DIRECTIONAL DRILL 8-1/2"INTERMEDIATE HOLE FROM 7243'MD TO 7421'MD(6440'TVD) (178'IN 3 HRS=59.3 FPH) -550 GPM,2950 PSI ON,2900 PSI OFF -150 RPM,7K TORQUE ON,5K TORQUE OFF, WOB 15-20K -PU 170K,SO 122K,ROT 131K ECD:ACTUAL 11.5-11.7 PPG,CALCULATED 10.7 PPG --SURVEY EVERY STAND -MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT -INSTANTANEOUS ROP 100 FPH -NO BACKREAMING AT CONNECTIONS -FINISH WEIGHT UP TO 10.3 PPG BY 7300'MD -BLENDED IN 86 BBLS NEW MUD DURING WEIGHT UP. -CIRCULATE ON BOTTOM 5 MIN PRIOR TO CONNECTIONS -TOP OF CM2 @ 7356'MD,6379'TVD(6288' TVDSS) -AVE ROP 59.6 FPH(INCLUDING CONNECTIONS)THROUGH CM2 SLOW PUMP RATES:7239'MD,6280'TVD, MUD WEIGHT 10.3 PPG MP#1:SPM 30/40;PSI 315/400 MP#2:SPM 30/40;PSI 300/400 Printed 12/1/2014 11:33:23AM • North America-ALASKA-BP • Page 24 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28©91.00usft(above Mean Sea Level) Date From-To Hrs Task Code I NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 18:00 6.00 DRILL P INTI DIRECTIONAL DRILL 8-1/2"INTERMEDIATE HOLE FROM 7421'MD TO 7865 MD(7144'TVD) (444'IN6HRS=74FPH) -550 GPM,3350 PSI ON,3300 PSI OFF -150 RPM,8K TORQUE ON,4K TORQUE OFF, WOB 15-20K -PU 172K,SO 131K,ROT 137K ECD:ACTUAL 11.5-11.7 PPG,CALCULATED 10.7 PPG -SURVEY EVERY STAND -MUD WEIGHT:10.2 PPG IN,10.3 PPG OUT -INSTANTANEOUS ROP 150 FPH -NO BACKREAMING AT CONNECTIONS -CIRCULATE ON BOTTOM 5 MIN PRIOR TO CONNECTIONS I-BLACK PRODUCT ADDITIONS IN SYSTEM BY 7650'MD. -TOP OF CM1©7495'MD,6500'TVD(6409' TVDSS) -AVE ROP 85.9 FPH(INCLUDING CONNECTIONS)THROUGH CM1 18:00 - 18:30 0.50 DRILL P INTI ' SERVICE TOP DRIVE AND RIG FLOOR EQUIPMENT 18:30 - 00:00 5.50 DRILL P INTI DIRECTIONAL DRILL 8-1/2"INTERMEDIATE HOLE FROM 7865'MD TO 8211'MD(7144'ND) (346'IN 6 HRS=57.7 FPH) -525 GPM,3160 PSI ON,2996 PSI OFF -120 RPM,5-9K TORQUE ON,5K TORQUE OFF,WOB 15K -PU 177K,SO 137K,ROT 140K -ECD:ACTUAL 11.35 PPG,CALCULATED 10.78 PPG -SURVEY EVERY STAND -MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT -INSTANTANEOUS ROP 120 FPH -NO BACKREAMING AT CONNECTIONS -CIRCULATE ON BOTTOM 5 MIN PRIOR TO CONNECTIONS -THRZ©7877'MD,6843'ND(6752'TVDSS) -AVE ROP 63.9 FPH(INCLUDING CONNECTIONS)THROUGH THRZ PUMPED 20 BBL LO-VIS/35 BBL HI-VIS SWEEP AT 8128'MD -MODERATE INCREASE IN FINE CUTTING OBSERVED -TOP OF THE KINGAK @ 8148'MD,7088'TVD (6997'TVDSS) SLOW PUMP RATES:8020'MD,6972'TVD, MUD WEIGHT 10.3 PPG MP#1:SPM 30/40;PSI 290/390 MP#2:SPM 30/40;PSI 290/400 Printed 12/1/2014 11:33:23AM North America-ALASKA-BP IP Page 25 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11/10/2014 00:00 - 06:00 6.00 DRILL P INTI DIRECTIONAL DRILL 8-1/2"INTERMEDIATE HOLE FROM 8211'MD TO 8574'MD(7471'TVD) (363'IN 6 HRS=60.5 FPH) -525 GPM,3150 PSI ON,3070 PSI OFF -120 RPM,5-9K TORQUE ON,5-6K TORQUE OFF,WOB 15K -PU 184K,SO 147K,ROT 145K -ECD:ACTUAL 11.5 PPG,CALCULATED 10.85 PPG -SURVEY EVERY STAND MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT INSTANTANEOUS ROP 120 FPH -NO BACKREAMING AT CONNECTIONS -CIRCULATE ON BOTTOM 5 MIN PRIOR TO CONNECTIONS PUMPED 20 BBL LO-VIS/35 BBL HI-VIS 'SWEEP AT 8285'MD -SLIGHT INCREASE IN CUTTINGS OBSERVED TJH @ 8338'MD,7259'TVD(7168'TVDSS) ' -AVE ROP 97.9 FPH(INCLUDING CONNECTIONS)THROUGH TJH -TJG @ 8369'MD,7286'TVD(7195'TVDSS) SLOW PUMP RATES:8466'MD,7366'TVD, MUD WEIGHT 10.3 PPG MP#1:SPM 30/40;PSI 300/410 MP#2:SPM 30/40;PSI 300/410 06:00 - 12:00 6.00 DRILL P INTI DIRECTIONAL DRILL 8-1/2"INTERMEDIATE HOLE FROM 8574'MD TO 8870'MD(7739'TVD) (295'IN 6 HRS=49.3 FPH) -525 GPM,3320 PSI ON,3280 PSI OFF 130 RPM,8-11K TORQUE ON,6K TORQUE OFF,WOB 12K -PU 192K,SO 142K,ROT 150K -ECD:ACTUAL 11.42 PPG,CALCULATED 10.85 PPG -SURVEY EVERY STAND -MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT -INSTANTANEOUS ROP 120 FPH -NO BACKREAMING AT CONNECTIONS -CIRCULATE ON BOTTOM 5 MIN PRIOR TO CONNECTIONS -VARY RPM;WOB;FLOW RATE AND INSTANTANIOUS ROP IN AN ATTEMPT TO FIND"SWEET SPOT'FOR MWD PULSERAND CLEAN UP BACKGROUND NOISE PUMPED 20 BBL LO-VIS/35 BBL HI-VIS SWEEP AT 8700'MD -SLIGHT INCREASE IN CUTTINGS OBSERVED -TJG @ 8369'MD,7286'TVD(7195'TVDSS) -AVE ROP 52.1 FPH(INCLUDING CONNECTIONS)THROUGH TJG -TJF @ 8746'MD,7626'TVD(7535'TVDSS) Printed 12/1/2014 11:33:23AM 4110 North America-ALASKA-BP • Page 26 of 38 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:OOAM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 18:00 6.00 DRILL P INTI DIRECTIONAL DRILL 8-1/2"INTERMEDIATE HOLE FROM 8870'MD TO 9250'MD(8093'TVD) (380'IN 6 HRS=63.3 FPH) 550 GPM,3450 PSI ON,3430 PSI OFF 150 RPM,8K TORQUE ON,5K TORQUE OFF, WOB 13K PU 197K,SO 146K,ROT 155K ECD:ACTUAL 11.2 PPG,CALCULATED 10.85 ,PPG SURVEY EVERY STAND MUD WEIGHT:10.3 PPG IN,10.4 PPG OUT -INSTANTANEOUS ROP 100 FPH NO BACKREAMING AT CONNECTIONS -CIRCULATE ON BOTTOM 5 MIN PRIOR TO 'CONNECTIONS PUMPED 35 BBL HI-VIS SWEEP AT 9050'MD AND 9237'MD -MODERATE INCREASE IN FINE CUTTINGS OBSERVED -TJF @ 8746'MD,7626'TVD(7535'TVDSS) -AVE ROP 65.3 FPH(INCLUDING CONNECTIONS)THROUGH TJF -TJD @ 9137'MD,7980'TVD(7889'TVDSS) SLOW PUMP RATES:8940'MD,7803'TVD, MUD WEIGHT 10.3 PPG MP#1:SPM 30/40;PSI 330/440 MP#2:SPM 30/40;PSI 330/445 18:00 - 18:30 0.50 DRILL P INTI SERVICE TOP DRIVE AND RIG FLOOR EQUIPMENT Printed 12/1/2014 11:33:23AM • North America-ALASKA-BP • Page 27 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) ...................._ Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:OOAM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:30 - 00:00 5.50 DRILL P INTI DIRECTIONAL DRILL 8-1/2"INTERMEDIATE HOLE FROM 9250'MD TO 9628'MD(8425'TVD) (378'IN 6 HRS=63.0 FPH) -550 GPM,3460 PSI ON,3460 PSI OFF -150 RPM,8K TORQUE ON,6K TORQUE OFF, WOB 10-15K PU 209K,SO 145K,ROT 162K ECD:ACTUAL 11.2 PPG,CALCULATED 10.85 PPG -SURVEY EVERY STAND MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT -INSTANTANEOUS ROP 100 FPH -NO BACKREAMING AT CONNECTIONS -CIRCULATE ON BOTTOM 5 MIN PRIOR TO CONNECTIONS -TJD @ 9137'MD,7980'TVD(7889'TVDSS) -AVE ROP 70.3 FPH(INCLUDING CONNECTIONS)THROUGH TJD -TJC @ 9397'MD,8216'TVD(8125'TVDSS) -AVE ROP 63.0 FPH(INCLUDING 'CONNECTIONS)THROUGH TJC 290 BBL DILUTION WITH NEW 10.3 PPG MUD PERFORMED FROM 9409'MD TO 9508'MD -TJB @ 9544'MD,8349'TVD(8258'TVDSS) -CONTROL DRILL FROM 9520'MD TO TJB -10K WOB -SIGNIFICANT REVERSE DRILLING BREAK OBSERVED -ROP DROPPED FROM 90 FPH TO 5 FPH -ISOPACH DOWN FROM TJB MARKER TO TSGR -AVE ROP 48.1 FPH(INCLUDING CONNECTIONS)THROUGH TJB -TJA @ 9621'MD,8419'TVD(8328'TVDSS) SLOW PUMP RATES:9504'MD,8318'TVD, MUD WEIGHT 10.3 PPG MP#1:SPM 30/40;PSI 320/430 MP#2:SPM 30/40;PSI 320/430 Printed 12/1/2014 11:33:23AM • North America-ALASKA-BP • Page 28 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date.11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3.00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Hrs Task I Code NPT NPT Depth Phase Description of Operations (hr) (usft) _ 11/11/2014 00:00 - 01:30 1.50 DRILL P INTI DIRECTIONAL DRILL 8-1/2"INTERMEDIATE HOLE FROM 9628'MD TO 9721'MD(8510'TVD) (93'IN 1.67 HRS=55.6 FPH) -550 GPM,3450 PSI ON,3380 PSI OFF -150 RPM,8-10K TORQUE ON,5K TORQUE OFF,WOB 10K -PU 201K,SO 150K,ROT 162K ECD:ACTUAL 11.2 PPG,CALCULATED 10.85 PPG SURVEY EVERY STAND -MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT -NO BACKREAMING AT CONNECTIONS -CIRCULATE ON BOTTOM 5 MIN PRIOR TO CONNECTIONS CONTROL DRILL FROM 9675'MD TO 9721' MD -2KWOB -OBSERVED SIGNIFICANT REVERSE DRILLING BREAK AT 9720'MD -ROP DROPPED FROM 60 FPH TO 15 FPH -DRILL 1'ADDITIONAL TO 9721'MD ESTIMATED TSGR @ 9720'MD,8509'TVD (8418'TVDSS) 01:30 04:00 2.50 DRILL P INTI CIRCULATE UP SAMPLE FOR GEOLOGY -550 GPM,3370 PSI -150 RPM,7K TORQUE -RECIPROCATING PIPE 53'AT 9 FPM NO SIGNS OF CONSOLIDATED SAND WITH GLAUCONITE IN SAMPLES DRILL 3'ADDITIONAL TO 9724'MD(8513'TVD) CIRCULATE UP SAMPLE FOR GEOLOGY !-550 GPM,3370 PSI I-150 RPM,7K TORQUE -RECIPROCATING PIPE 53'AT 9 FPM SAG RIVER SAND IN SAMPLES; CONSOLIDATED SAND WITH GLAUCONITE OBSERVED. 8-1/2"INTERMEDIATE SECTION TD;9724'MD (8513'TVD) Printed 12/1/2014 11:33:23AM • North America-ALASKA-BP • Page 29 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date: 10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28©91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) ___ (usft) 04:00 - 09:00 5.00 DRILL P INTI CIRCULATE HOLE CLEAN WITH 9 TOTAL BOTTOMS UP PRIOR TO WIPER TRIP -STAGE ROTARY UP TO 180 RPM,7K TORQUE -550 GPM,3350 PSI ICP,3260 PSI FCP -RECIPROCATING PIPE 57'AT 9 FPM -INITIAL ECD=11.21 PPG,FINAL=11.05 PPG INITIAL PU WEIGHT=200 KLBS,SLACKOFF =150 KLBS PUMP 35 BBL HI-VIS SWEEP(SLIGHT INCREASE IN FINE CUTTINGS OBSERVED) PUMP 30 BBL 11.8 PPG WEIGHTED SWEEP (SLIGHT INCREASE IN FINE CUTTINGS OBSERVED) PUMP 35 BBL HI-VIS SWEEP(SLIGHT INCREASE IN FINE CUTTINGS OBSERVED) FLOWCHECK WELL PRIOR TO PULLING OFF BOTTOM FOR 10 MIN(STATIC) 09:00 - 12:00 3.00 DRILL P INTI PLANNED WIPER TRIP: PUMP OUT OF THE I HOLE WITH 8-1/2"DRILLING ASSEMBLY FROM TD AT 9724'MD TO 8464'MD 0.5 BPM TO REPLACE PIPE DISPLACEMENT, 65 PSI,30 FPM -OBSERVED 30K OVERPULL AND SIGNS OF SWABBING,DECISION MADE TO RUN IN 3 STANDS TO 8749'AND CIRCULATE HOLE CLEAN 12:00 - 13:00 1.00 DRILL P INTI CIRCULATE BOTTOMS UP -550 GPM,3200 PSI 180 RPM,6K TORQUE HOLE UNLOADED FINES AT BOTTOMS UP 13:00 - 15:00 2.00 DRILL P INTI PLANNED WIPER TRIP: PUMP OUT OF THE HOLE WITH 8-1/2"DRILLING ASSEMBLY FROM TD AT 8749'MD TO TOP OF SHALES AT 7800' MD 0.5 BPM TO REPLACE PIPE DISPLACEMENT, 65 PSI,30 FPM -OBSERVED 10-25K OVERPULL FROM 8530' MD TO 8200'MD 15:00 16:30 1.50 i DRILL P INTI CIRCULATE 3 BOTTOMS UP AT TOP OF SHALES -550 GPM,3000 PSI -180 RPM,5K TORQUE -HOLE UNLOADED FINES AT FIRST BOTTOMS UP AND CLEANED UP THROUGHOUT SECOND AND THIRD BOTTOMS UP 16:30 - 18:30 2.00 DRILL P INTI PLANNED WIPER TRIP:PULL OUT OF THE HOLE ON ELEVATORS FROM 7800'MD TO 6650'MD -PU 173K,SO 115K -OBSERVED 20K-30K OVERPULL FROM 7445'MD TO 6650'MD,OBSERVED SIGNS OF SWABBING,DECISION MADE TO RUN IN THE HOLE TO BELOW INITIAL TIGHT HOLE AT 7500'MD AND CIRCULATE HOLE CLEAN Printed 12/1/2014 11:33:23AM • North America-ALASKA-BP • Page 30 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:30 - 19:30 1.00 DRILL P INTI TRIP IN THE HOLE FROM 6650'MD TO BELOW INITIAL TIGHT HOLE AT 7500'MD -NO ISSUES TRIPPING IN THROUGH PREVIOUS TIGHT HOLE 19:30 - 20:30 1.00 DRILL P INTI CIRCULATE HOLE CLEAN WITH 2 BOTTOMS UP -550 GPM,2800 PSI 180 RPM,5K TORQUE HOLE UNLOADED FINES AT FIRST BOTTOMS UP AND CLEANED UP THROUGHOUT SECOND BOTTOMS UP -CLEAN HOLE ECD=10.9 PPG,ACTUAL= 10.9 PPG PUMP 30 BBL HI-VIS SWEEP(MODERATE INCREASE IN FINE CUTTINGS OBSERVED) 20:30 - 22:00 1.50 DRILL P INTI PULL OUT OF THE HOLE ON ELEVATORS FROM 7500'MD TO 6600'MD -PU 160K,SO 115K -NO ISSUES PULLING OUT OF THE HOLE THROUGH PREVIOUSLY WIPED HOLE -OBSERVED 30K-40K OVERPULL FROM 6650'MD TO 6600'MD DISCUSSED PLAN FORWARD WITH ODE, DECISION MADE TO BACKREAM OUT OF THE HOLE TO TOP OF WIPER TRIP AT 6200'MD 22:00 - 23:00 1.00 DRILL P INTI BACKREAM OUT OF THE HOLE FROM 6600' MD TO 6200'MD,2 STANDS ABOVE GHOST REAMER TD DEPTH -550 GPM,2700 PSI -120 RPM,3K TORQUE -1000 FT/HR MAX PULLING SPEED 23:00 - 00:00 1.00 DRILL P INTI CIRCULATE HOLE CLEAN -550 GPM,2500 PSI -180 RPM,5K TORQUE -HOLE UNLOADED FINES AT FIRST BOTTOMS UP AND CLEANED UP THROUGHOUT SECOND BOTTOMS UP -PUMP 30 BBL HI-VIS SWEEP(MODERATE INCREASE IN FINE CUTTINGS OBSERVED) 11/12/2014 00:00 - 00:30 0.50 DRILL P INTI COMPLETE CIRCULATING HOLE CLEAN WITH 2ND BOTTOMS UP -550 GPM,2500 PSI -180 RPM,5K TORQUE -PU 150K,SO 115K -INITIAL ECD=11.24 PPG,FINAL=10.90 PPG -PULL ADDITIONAL 2 STANDS ON ELEVATORS TO 6000'MD TO EVALUATE HOLE THAT THE GHOST REAMER WIPED ON THE WAY OUT,OBSERVED 10K-15K OVERPULL WHILE PULLING STANDS 00:30 - 04:30 4.00 DRILL P INTI TRIP IN THE HOLE ON ELEVATORS FROM 6000'MD TO BOTTOM AT 9724'MD -WASH DOWN LAST STAND AT 2BPM,2'FILL ON BOTTOM -WORKED THROUGH TIGHT SPOTS AT 7820' MD AND 8410'MD WITH 30K UNDER STRING WEIGHT Printed 12/1/2014 1133:23AM • North America-ALASKA-BP • Page 31 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:30 - 11:00 6.50 DRILL P INTI CIRCULATE HOLE CLEAN WITH 8 BOTTOMS UP 550 GPM,3400 PSI,180 RPM,8K TORQUE, RECIPROCATE FULL STAND 1-MW IN/OUT=10.3 PPG -CALC CLEANHOLE ECD=10.85 PPG, ACTUAL=10.8 PPG HOLE UNLOADED FINES AT FIRST BOTTOMS UP -PUMP 30 BBL 11.8 PPG WEIGHTED SWEEP FOLLOWED BY 25 BBL 250 SEC/QT HI-VIS SWEEP(MODERATE INCREASE IN SHALE AND FINE CUTTINGS OBSERVED) -PUMPED 30 BBL 250 SEC/QT HIGH VIS SWEEP(SLIGHT INCREASE IN FINE CUTTINGS OBSERVED) SLOW PUMP RATES:9724'MD,MUD WEIGHT 10:3 PPG MP#1:SPM 30/40;PSI 270/375 MP#2:SPM 30/40;PSI 270/375 --MONITOR WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM(STATIC) 11:00 - 12:00 1.00 DRILL N RREP 9,724.00 INT1i IADC CODE 8 NPT: TROUBLESHOOT IRON DERRICKMAN -ATTEMPT TO PULL OUT OF THE HOLE WITH FIRST STAND,IRON DERRICKMAN NOT RESPONDING TO COMMANDS 12:00 - 15:00 3.00 DRILL P INTI PUMP OUT OF THE HOLE FROM 9724'MD TO TOP OF SHALES AT 7800'MD -0.5 BPM TO REPLACE PIPE DISPLACEMENT, 65 PSI,30 FPM -NO ISSUES WHILE PULLING THROUGH SHALES -PICKUP WEIGHT OFF BOTTOM WITH PUMPS ON=210 KLBS 15:00 - 16:00 1.00 DRILL P INTI PULL OUT OF THE HOLE ON ELEVATORS FROM 7800'MD TO 6680'MD -PULL AT 50 FT/MIN -PU 180K,SO 120K,AT 7800'MD 16:00 - 17:00 1.00 DRILL N RREP 9,724.00 INTI IADC CODE 8 NPT: TROUBLESHOOT IRON DERRICKMAN -IRON DERRICKMAN WOULD NOT MOVE UP OR DOWN NO COMMUNICATION WITH LOAD CELL DUE TO PINCHED CABLE -DECISION MADE TO PULL TO CASING SHOE IN OVERRIDE MODE AND TROUBLESHOOT FURTHER. Printed 12/1/2014 11:33:23AM • North America-ALASKA-BP • Page 32 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) l Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release: 11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:00 - 22:00 5.00 DRILL P INTI PULL OUT OF THE HOLE ON ELEVATORS FROM 6680'MD TO CASING SHOE AT 3176'MD -LAYDOWN GHOST REAMER:ONE JUNK SLOT FULL OF CLAY AND 1/8"OUT OF GAUGE -MONITOR WELL AT SHOE FOR 10 MIN (STATIC) -PU 150K,SO 115K AT 6680'MD OBSERVED 30K OVERPULLAT 5650'MD, WORKED THROUGH TIGHT SPOT,TRIPPED DOWN AND BACK UP THROUGH TIGHT SPOT WITH NO ISSUES 22:00 - 22:30 0.50 DRILL P INTI CIRCULATE BOTTOMS UP AT CASING SHOE -550 GPM,1600 PSI -NO CUTTINGS BACK TO SURFACE AT BOTTOMS UP -REPAIR IRON DERRICKMAN -PERFORM WEEKLY FUNCTION TEST OF ANNULAR AND LOWER PIPE RAMS 22:30 - 23:00 0.50 DRILL P - INTI SERVICE RIG -GREASE TOPDRIVE,BLOCKS AND RIG FLOOR EQUIPMENT 23:00 - 00:00 1.00 DRILL P INTI PULL OUT OF THE HOLE ON ELEVATORS FROM 3176'MD TO 2633'MD AT MIDNIGHT • -PU 103K AT 6680'MD 11/13/2014 00:00 - 01:30 1.50 DRILL P INTI PULL OUT OF THE HOLE ON ELEVATORS FROM 2633'MD TO TOP OF BHAAT 711'MD -MONITOR WELL FOR 10 MIN PRIOR TO PULLING BHA THROUGH BOP STACK(STATIC) CHANGE OUT PS-21 AND BX ELEVATOR INSERTS TO ACCOMMODATE 5"DP 01:30 - 04:30 3.00 DRILL P • INTI PULL OUT OF THE HOLE AND LAY DOWN BHA FROM 711'MD TO SURFACE -LAY DOWN 6 STANDS OF 5"HWDP -LAY DOWN ALL DIRECTIONAL TOOLS. NO SIGNS OF TRASH IN FILTER SUB. -BIT GRADE:1-1-BT-G-X-I-NO-TD -FUNCTION BLIND-SHEAR RAMS 04:30 - 05:00 0.50 CASING P INTI 'CLEAN AND CLEAR RIG FLOOR -PREPARE TO RIG UP CASING CREW 05:00 - 06:00 1.00 WHSUR P INTI PULL WEAR BUSHING AND MAKE DUMMY RUN WITH 7"TEST JOINT AND HANGER -VERIFY HANDLING EQUIPMENT WITH RIG MANAGER -MARK NEW LANDING JOINT WITH DATE AND WELL NUMBER -FUNCTION UPPER PIPE RAMS TO COMPLETE WEEKLY BOPE FUNCTION TEST 06:00 - 09:00 3.00 CASING P INTI RIG UP TO RUN 7"CASING -VOLANT TOOL WITH BAKER CEMENT ,,SWIVEL,FILL-UP HOSE,250T SIDE DOOR • ELEVATORS,LONG BALES WITH 4' EXTENSIONS,&STANDARD SINGLE TONGS. -VERIFY HANDLING EQUIPMENT WITH RIG MANAGER -HOLD PJSM WITH RIG TEAM FOR RUNNING • CASING • Printed 12/1/2014 11:33:23AM • North America-ALASKA-BP • Page 33 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28©91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 15:30 6.50 CASING P INTI RUN 7",26#,L-80,VAMTOP INTERMEDIATE CASING FROM SURFACE TO 9-5/8"SURFACE CASING SHOE AT 3176'MD. -BAKER LOK SHOE TRACK AND CHECK FLOATS(PASS) -APPLY JET LUBE SEAL GUARD AND TORQUE TURN VAMTOP CONNECTIONS TO 11950 -FT-LBS OPTIMUM MAKEUP TORQUE -RUNNING SPEED=60 FPM IN CASED HOLE -8-1/4"OMD SPLIT RIB HYDROFORM CENTRALIZERS INSTALLED ON FIRST 1500' OF CASING -FILL PIPE EACH JOINT WITH FILL-UP HOSE. TOP OFF AND RECORD PU/SO WEIGHTS EVERY 10 JOINTS 15:30 - 16:00 0.50 CASING P INTI CIRCULATE BOTTOMS UP AT 9-5/8"CASING SHOE PRIOR TO ENTERING OPENHOLE. -STAGE UP PUMPS TO 6 BPM,450 PSI -NO LOSSES 16:00 - 00:00 8.00 CASING P INTI RUN 7",26#,L-80,VAMTOP INTERMEDIATE CASING FROM 9-5/8"SHOE TO 7850'MD AT MIDNIGHT. -APPLY JET LUBE SEAL GUARD AND TORQUE rTURN VAMTOP CONNECTIONS TO 11950 FT-LBS OPTIMUM MAKEUP TORQUE -RUNNING SPEED=40 FPM IN OPEN HOLE -FILL PIPE EACH JOINT WITH FILL-UP HOSE. -TOP OFF EVERY 10TH JOINT AND RECORD PU/SO WEIGHTS,EXCEPT IN UGNU. -TOP OFF EVERY 5TH JOINT AND RECORD PU/SO WEIGHTS THROUGH UGNU,4432'- 6023'MD -NO ISSUES WHILE RUNNING IN OPEN HOLE 11/14/2014 00:00 - 03:30 3.50 CASING P INTI RUN 7",26#,L-80,VAMTOP INTERMEDIATE CASING FROM 7850'MD TO CASING TD AT 9720'MD. -FINAL S/O WT 162K,NO FINAL PU WT -APPLY JET LUBE SEAL GUARD AND TORQUE TURN VAMTOP CONNECTIONS TO 11950 FT-LBS OPTIMUM MAKEUP TORQUE -RUNNING SPEED=40 FPM IN OPEN HOLE FILL PIPE EACH JOINT WITH FILL-UP HOSE. TOP OFF EVERY 10TH JOINT AND RECORD PU/SO WEIGHTS -NO LOSSES WHILE RUNNING IN THE HOLE -WORKED THROUGH TIGHT HOLE FROM 8450'MD TO 8550'MD WITH 40K UNDER STRING WEIGHT • Printed 12/1/2014 11:33:23AM BP 39 • North AmericaPage Operation Summary Report Common Well Name N-28 AFE No Event Type DRL-ONSHORE(DON) Start Date.10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28©91.Oousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:30 - 13:30 10.00 CASING P INTI STAGE UP PUMPS AND CIRCULATE HOLE CLEAN WITH 11 TOTAL BOTTOMS UP. - CONDITION MUD TO 10.3 PPG,11 PV,16 YP -1 BPM,450 PSI -2 BPM,544 PSI -3 BPM,677 PSI -4 BPM,775 PSI -5 BPM,875 PSI -6 BPM,1078 PSI ICP UNTIL PACK-OFF. HAVE TO RE-STAGE UP -3 BPM,568 PSI -4 BPM,775 PSI -5 BPM,890 PSI -6 BPM,1380-1500 PSI(UNSTABLE AND SHOWING SIGNS OF PACKING OFF, 1 INCREASE IN CUTTINGS NOTED AT SHAKERS). DROP RATE TO 5 BPM TO COMPARE -5 BPM,1075 PSI ICP,900 PSI FCP STABLE (3.5 BOTTOMS UP). CUTTINGS CLEAN UP AT SHAKERS. RECIPROCATE 2'PIPE STRETCH AT SURFACE,2 FPM MUD LOSSES:0 BBL -MIRU SLB. HOLD PJSM FOR CEMENTING. COMPLETE PRESSURE CROSSCHECK. -PRESSURE TEST LINES WITH FRESH WATER TO 250 PSI LOW AND 4000 PSI HIGH FOR FIVE MIN EACH(PASS,LEAKTIGHT CRITERIA). -DECISION TO DROP PLANNED CEMENT DISPLACEMENT RATE FROM 6 BPM TO 5 BPM DUE TO TROUBLES CIRCULATING AT 6 BPM AND NOTED PRESSURE STABILITY AT 5 BPM. Printed 12/1/2014 1133.23AM North America-ALASKA-BP • Page 35 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date.11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations _ (hr) (usft) 13:30 - 16:30 3.00 CEMT P INTI CEMENT 7"INTERMEDIATE CASING AS FOLLOWS: -PUMP 30 BBLS OF 12 PPG MUDPUSH II SPACER @ 5 BPM,931 PSI ICP,983 PSI FCP -DISENGAGE VOLANT TOOL AND LOAD BOTTOM PLUG -PUMP 50.6 BBLS(243 SACKS)OF 15.8 PPG CLASS G CEMENT @ 5 BPM,1400 PSI ICP, 1067 PSI FCP,EXCESS VOLUME 40%(YIELD 1.17 CU.FT/SK) -DISENGAGE VOLANT TOOL AND LOAD TOP PLUG -SLB KICK OUT PLUG WITH 10 BBL 8.4 PPG FRESH WATER(-2 BBLS CEMENT LEFT ON TOP OF PLUG) PERFORM DISPLACEMENT WITH RIG PUMPS AND 10.3 PPG LSND MUD PER SLB CADE -300 BBLS DISPLACED AT 5 BPM:470 PSI ICP, 621 PSI FCP,FULL RETURNS -45 BBLS DISPLACED AT4 BPM:375 PSI ICP, 1870 PSI FCP(PACKED OFF),FULL RETURNS. -AT SIGN OF PACKING OFF,SHUT DOWN .PUMPS AND MONITOR PRESSURE BLEED OFF(1870-892 PSI IN 1 MIN WITH SLIGHTLY REDUCED RETURN FLOW FROM WELL) -RESUME PUMPING AT 2 BPM FOR 9 BBLS, 892 PSI ICP,2470 PSI FCP(PACKED OFF) -AT SECOND PACK-OFF,WELL GOES ON TOTAL LOSSES. SHUT DOWN PUMPS AND MONITOR PRESSURE BLEED OFF(2470-1386 PSI IN 2 MIN) RESUME PUMPING AT 1 BPM FOR 4 BBLS, 1386 PSI ICP,1560 PSI FCP,NO RETURNS -INCREASE RATE TO 2 BPM FOR 1 FINAL BBL TO BUMP PLUG ON CALCULATED STROKES AT 1851 PSI,3881 STROKES(96%PUMP EFFICIENCY) -TOTAL DISPLACEMENT VOLUME FOR RIG= 359 BBLS -TOTAL LOSSES AFTER CEMENT BEGINS UP ANNULUS=5 BBLS. -CEMENT IN PLACE AT 15:30 -FLUID LEVEL IN STACK DROPS 1'IN 1 HOUR FOLLOWING CIP -AFTER PLUG BUMP,INCREASE PRESSURE TO 2475 PSI AND HOLD FOR 15 MIN -CHECK FLOATS-PASS -RECIPROCATE 2'PIPE STRETCH AT 2 FPM AT SURFACE DURING ENTIRE JOB -FIELD ESTIMATE FOR TOC=8440'MD,7350' TVD(BASED ON 5 BBL LOSSES) -SEE ATTACHED DOCUMENTATION. -20"CONDUCTOR X 9-5/8"ANNULUS CEMENT HEIGHT=-5'DOWN FROM FLUTES. Printed 12/1/2014 11:33:23AM • North America-ALASKA-BP • Page 36 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. OM:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:30 - 18:00 1.50 CASING P INTI PRESSURE TEST 7"CASING TO 250 PSI LOW FOR 5 MIN AND 4000 PSI HIGH FOR 30 MIN (PASS) -TEST LOST 5 PSI IN FIRST 15 MIN AND 0 PSI IN 2ND 15 MIN. -PUMP 6 BBLS TO PRESSURE UP AND BLEED BACK SAME 6 BBLS SEE ATTACHED DOCUMENTATION -OBTAIN WTL APPROVAL TO PROCEED 18:00 - 19:00 1.00 CASING P INTI BREAK OUT AND LAY DOWN LANDING JOINT -BLOW DOWN SURFACE LINES AND EQUIPMENT 19:00 - 21:00 2.00 BOPSUR P INTI CHANGE OUT UPPER 7"CASING RAMS TO 2-7/8"X 5-1/2"VARIABLE RAMS -BARRIERS:BLIND/SHEAR RAMS AND KILL WEIGHT FLUID,MONITORED BY CIRCULATING ACROSS THE MUD CROSS SIMOPS: -LAY DOWN LONG BALES,BALE EXTENSIONS,AND VOLANT TOOL -RIG UP 11'BALES AND BX ELEVATORS 21:00 - 22.00 1.00 WHSUR P INTI MAKE UP PACK-OFF RUNNING TOOL TO STAND OF HWDP AND RUN AND SET 7" PACK-OFF 1-RUN IN LOCK DOWN SCREWS AND TORQUE TO 450 FT/LBS 22:00 - 23:30 1.50 WHSUR P INTI PRESSURE TEST PACK-OFF VOIDS TO 250 PSI LOW FOR 5 MIN AND 5000 PSI HIGH FOR 30 MIN -REFERENCE PPPOT RP FOR ACCEPTANCE 1 CRITERIA -REVIEW PRESSURE CROSSCHECK SIMOPS: -MAKE UP TEST JOINTS TO TEST UPPER VARIABLE RAMS -RIG UP TO FREEZE PROTECT 7"X9-5/8" ANNULUS 23:30 - 00:00 0.50 BOPSUR P INTI RIG UP TO PRESSURE TEST UPPER VARIABLE RAMS 11/15/2014 00:00 - 01:30 1.50 BOPSUR P INTI PRESSURE TEST 2-7/8"X 5-1/2"UPPER VARIABLE RAMS TO 250 PSI LOW AND 4000 PSI HIGH FOR 5 MIN EACH -TEST WITH 4-1/2"AND 4"TEST JOINTS -SEE ATTACHED TEST CHART 01:30 - 03:00 1.50 WHSUR P INTI PULL TEST PLUG AND SET WEAR BUSHING -WEAR BUSHING ID=7-1/4" -BREAK DOWN AND LAY DOWN TEST JOINT SIMOPS:START TO FREEZE PROTECT OA -PUMP 24 BBL OF 14.8 PPG LSND AT 2 BPM -INITIAL BREAKOVER 450 PSI,FINAL PRESSURE 290 PSI -500 PSI COMPRESSIVE STRENGTH :ACHIEVED AT 02:45,BEGAN INJECTING AT 02:50 -BLOW DOWN LINES Printed 12/1/2014 11'33:23AM • North America-ALASKA-BP S Page 37 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) I Start Date:10/29/2014 End Date:11/17/2014 1X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 06:00 3.00 CASING P INTI CUT AND SLIP 102'DRILLING LINE DRESS PS-21 SLIPS FOR 4"DP HANG BLOCKS -RECALIBRATE BLOCK HEIGHT WITH AMPHION AND BAKER 06:00 - 11:30 5.50 CASING P INTI PICK UP 6-1/8"DRILLING BHA TO 687'MD -4-3/4"BAKER X-TREME MUD MOTOR,1.2°, .49 REV/GAL WITH PORTED FLOAT -6-1/8"SMITH XR20 -LWD WITH GR/RES/SUR/DEN/NEU/CALIPER -SLB SONIC SCOPE FOR NON-CIRCUMFERENTIAL TOC,TOOL HAS 30HR OF MEMORY STORAGE STARTING AT 10:00 -VERIFY PIPE HANDLING EQUIPMENT SIMOPS:FREEZE PROTECT OA TO 2200'TVD -PUMP 58BBL 6.8 PPG DIESEL -INITIAL BREAKOVER 400 PSI,FINAL PRESSURE AT 2.5 BPM,700 PSI -SHUT IN WITH 650 PSI 11:30 - 20:30 9.00 CASING P INTI TRIP IN THE HOLE ON ELEVATORS FROM 687' I MD TO 9590'MD -LOG AT 890 FT/HR WITH SONICSCOPE FROM 7000'MD BIT DEPTH,6870'MD TOOL DEPTH '-WASH DOWN FROM 9500'MD TO TOP OF CEMENT 9590'MD,46'ABOVE FLOAT COLLAR,CONTINUE LOGGING WHILE DRILLING OUT 1-250 GPM,2215 PSI I-MUD WT:10.3 PPG IN/OUT SLOW PUMP RATES:9500'MD,MUD WEIGHT 10.3 PPG MP#1:SPM 30/40;PSI 830/1075 MP#2:SPM 30/40;PSI 780/1075 20:30 - 21:30 1.00 DRILL ' P I INTI DRILL CEMENT AND FLOAT COLLAR FROM 9590'MD TO 10'FROM SHOE AT 9710'MD -250 GPM,2215 PSI -40 RPM,5K TORQUE -3K-7KWOB PU 160K,SO 120K,ROT 149K -TAG FLOAT COLLAR ON DEPTH,WORKED BIT THROUGH FLOAT COLLAR WITH NO ISSUES 21:30 - 00:00 2.50 DRILL P INTI CIRCULATE BOTTOMS UP AND DISPLACE 10.3PPG LSND TO 8.5PPG QUICK DRILL-N -250 GPM,ICP 2150 PSI,FCP 1280 PSI -40 RPM,6K TORQUE 11/16/2014 00:00 - 00:30 0.50 DRILL P INTI COMPLETEDISPLACMENTTO8.5PPG QUICKDRIL-N -250 GPM,1280 PSI -40 RPM,5K TORQUE SLOW PUMP RATES:9697'MD,MUD WEIGHT 8.5 PPG MP#1:SPM 30/40;PSI 530/700 MP#2:SPM 30/40;PSI 550/710 Printed 12/1/2014 11:33:23AM • North America-ALASKA-BP S Page 38 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. I UWI:500292352400 Active datum:N-28©91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 00:30 - 01:30 1.00 DRILL P INTI DRILL CEMENT,FLOAT SHOE,AND 20'OF NEW FORMATION FROM 9710'MD TO 9744' MD -250 GPM,1380 PSI -40 RPM,5K TORQUE -3K-7KWOB -MUD WT:8.5PPG IN/OUT -PU 198K,SO 134K,ROT 157K -TAG SHOE ON DEPTH,WORKED BIT THROUGH SHOE WITH NO ISSUES 01 30 - 02:00 0.50 DRILL P INTI CIRCULATE HOLE CLEAN WITH ONE BOTTOMS UP -250 GPM,1280 PSI -40 RPM,8K TORQUE -MONITOR WELL FOR 10 MIN(STATIC) 02 00 - 03:00 1.00 DRILL P INTI RIG UP AND PERFORM FIT VNTH ANNULAR PREVENTER -MUD WEIGHT:8.5 PPG,8509'TVD,9720'MD '-PUMP 1 BBLS TO 890 PSI,BLEED BACK 1 BBLS -FIT EMW=10.5 PPG -TEST APPROVED BY ODE 03.00 - 17:30 14.50 DRILL P PROD1 DIRECTIONAL DRILL 6-1/8"PRODUCTION HOLE FROM 9744'MD TO WELL TOTAL DEPTH , AT 10451'MD(707'IN 14.5 HRS=48.8 FPH WITH CONNECTIONS) -INSTANTANEOUS ROP=100-145 FPH, EXCEPT IN SHUBLIK AND ZONE 3 -300 GPM,1750-1910 PSI,100 RPM,8 KFT-LBS OFF BOTTOM TORQUE,9-10 FT-LBS ON BOTTOM,10-15 KLBS WOB -MW IN/OUT=8.6 PPG -SURVEY EVERY STAND -BACKREAM FULL STAND PRIOR TO CONNECTIONS -NO LOSSES WHILE DRILLING AHEAD I SLOW PUMP RATES:10451'MD,MUD WEIGHT 8.6 PPG MP#1:SPM 30/40;PSI 580/740 MP#2:SPM 30/40;PSI 590/750 17.30 - 19:30 2.00 DRILL P PROD1 CIRCULATE HOLE CLEAN WITH 3 BOTTOMS UP 300 GPM,1800 PSI -100 RPM,10K TORQUE -PUMP 30 BBL HIGH VIS SWEEP,MINIMAL INCREASE IN CUTTINGS BACK AT SHAKERS -MONITOR WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM(STATIC) 19:30 - 20:30 1.00 DRILL P PROD1 PLANNED SHORT TRIP:PULL OUT OF THE HOLE ON ELEVATORS FROM 10451'MD TO 7" CASING SHOE AT 9720'MD -NO ISSUES WHILE PULLING OUT OF OPEN HOLE -PU 225K,SO 130K -MONITOR WELL FOR 10 MIN AT 7"CASING SHOE(STATIC) Printed 12/1/2014 11.33.23AM North America-ALASKA-BP • Page 39 of 39 Operation Summary Report Common Well Name:N-28 AFE No Event Type:DRL-ONSHORE(DON) Start Date:10/29/2014 End Date:11/17/2014 X3-015JN-C:(7,637,969.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. I UWI:500292352400 Active datum:N-28©91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 21:30 1.00 DRILL P PROD1 PLANNED SHORT TRIP:TRIP IN THE HOLE ON ELEVATORS FROM 7"CASING SHOE AT 9720' MD TO TD AT 10451'MD -NO ISSUES WHILE TRIPPING IN OPEN HOLE -PU 225K,SO 130K 21:30 - 22:00 0.50 DRILL P PROD1 CIRCULATE HOLE CLEAN WITH 1 BOTTOMS UP 300 GPM,1800 PSI -100 RPM,10K TORQUE -MONITOR WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM(STATIC) 22:00 - 00:00 2.00 DRILL P PROD1 PULL OUT OF THE HOLE ON ELEVATORS FROM 10451'MD TO 8253'MD AT MIDNIGHT -MONITOR WELL AT SHOE FOR 10 MIN (STATIC) -PUMP DRY JOB AND DROP 2.4"RABBIT AT SHOE -PU 215K,SO 130K 11/17/2014 00:00 - 04:30 4.50 DRILL P PROD1 PULL OUT OF THE HOLE FROM 8253'MD TO BHAAT 668'MD , .J-MONITOR WELL AT BHA FOR 10 MIN(STATIC) 04:30 - 08:00 3.50 DRILL P PROD1 LAY DOWN BHA FROM 668'MD TO SURFACE. LAY DOWN 5 STANDS OF 4"HWDP+JARS -LAY DOWN ALL DIRECTIONAL TOOLS -GRADE BIT 2-2-WT-A-E-I-ER-TD -DOWNLOAD AND PROCESS SONICSCOPE LOGGING DATA IN PIPE BARN. -INITIAL LOG ANALYSIS OF LOG SHOWS TOP OF 7"CEMENT AT-8600'MD,7494'TVD. 1120'MD,1015'TVD COLUMN ACHEIVED ABOVE 7"SHOE. END DON EVENT AT 08:00 ON 11/17/14. BEGIN CON EVENT. DAYS PER 10K FOR SPUD TO UD FINAL DRILLING BHA=16.5 Printed 12/1/2014 11:33:23AM 1111 • North America-ALASKA-BP Page 1 of 5 Operation Summary Report Common Well Name:N-28 AFE No Event Type:COM-ONSHORE(CON) Start Date:11/17/2014 End Date:11/20/2014 X3-015JN-C:(2,362,031.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11/17/2014 08:00 - 10:00 2.00 CASING P RUNPRD BEGIN CON EVENT WITH PARKER 272 AT 08:00 ON 11/17/14 RIG UP TO RUN 4-1/2"LINER -RIG DOWN BX ELEVATORS -RIG UP SIDE DOOR ELEVATORS,VERIFY CORRECT SIZE FOR PIPE BEING PICKED UP -DRESS PS-21'S WITH FALSE BOWLS TO RUN HAND SLIPS 10:00 - 22:00 12.00 CASING P RUNPRD RUN 4-1/2",12.6#,13CR-85,PRODUCTION LINER TO 900'MD CHECK FLOATS(PASS) -APPLY JET LUBE SEAL GUARD PIPE DOPE& TORQUE TURN CONNECTIONS TO 4700 FT-LBS -RUN 36 CENTRALIZERS FILL CASING EVERY JOINT LINER WT:PU 47K,SO K MAKE UP LINER HANGER/PACKER ASSEMBLY AND XO TO DP,ADD PAL MIX -CIRCULATE 1X LINER VOLUMES AT 2 BPM, 70 PSI CONTINUE IN HOLE TO 9720'MD(7"SHOE) ON 4"DRILL PIPE RIH AT 100 FT/MIN FROM 900'MD TO 9720' MD -CIRCULATE 1.5 DP AND LINER VOLUMES AT 7 BPM,860 PSI,NO LOSSES -PU 180K,SO 130K,ROT 154K TORQUE AT SHOE:10 RPM=5K,20 RPM= 6K RUN INTO OPEN HOLE WITH LINER TO BOTTOM AT 10451'MD,TAG BOTTOM AND STAGE PIPE 2'OFF BOTTOM PU 196KK,SO 140K,ROT 154K -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -NO LOSSES WHILE RIH -TOP OF LINER AT 9549'MD,PBTD=10365' MD 22:00 - 00:00 2.00 CASING P RUNPRD STAGE UP TO CEMENTING RATE IN.5 BPM INCREMENTS TO FINAL CIRCULATING RATE OF 7 BPM. -@ 2 BPM,385 PSI -@ 3 BPM,480 PSI -@ 4 BPM,590 PSI @5 BPM,770 PSI -@ 6 BPM,865 PSI -@ 7 BPM,1000 PSI -INITIAL PRESSURE AT CEMENTING RATE: 1000 PSI -CIRCULATE TOTAL OF 3 TIMES BOTTOMS-UP -ROTATE 20 RPM,6K TORQUE WHILE CIRCULATING -NO LOSSES WHILE CIRCULATING Printed 12/1/2014 11:34:10AM North America-ALASKA-BP tizr,:-WitV,,AgAgeVoNgWeilkeiw Operation Summary Report Common Well Name.N-28 AFE No Event Type:COM-ONSHORE(CON) Start Date:11/17/2014 End Date.11/20/2014 X3-015JN-C:(2,362,031.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.0ousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11/18/2014 00:00 - 00:30 0.50 CASING P RUNPRD COMPLETE CIRCULATING PRIOR TO CEMENTING -7 BPM,1000 PSI -20 RPM,6K TORQUE 00:30 - 03:30 3.00 CEMT P RUNPRD CEMENT 4-1/2"PRODUCTION LINER AS FOLLOWS: -FILL LINES WITH WATER AND PRESSURE TEST TO 250 LOW,4500 PSI HIGH FOR 5 MINUTES -PUMP 30 BBLS OF 10 PPG MUDPUSH II SPACER @ 5 BPM PUMP 24.4 BBLS(117 SACKS)OF 15.8 PPG CLASS G TAIL @ 5 BPM,EXCESS VOLUME 30% (YIELD 1.17 CU.FT/SK) -DROP DRILL PIPE WIPER DART -ROTATED PIPE DURING CEMENT JOB AT 20 RPM,6K TORQUE PERFORM DISPLACEMENT WITH SLB 'CEMENTERS , -95 BBLS DISPLACED AT 7 BPM:ICP 520 PSI, FCP 1000 PSI,CAUGHT CEMENT AT 29 BBL I INTO DISPLACEMENT 10 BBLS DISPLACED AT 3 BPM:ICP 400 PSI, FCP 700 PSI 2.8 BBLS DISPLACED AT 2 BPM:ICP 675 PSI, FCP 1180 PSI -DISPLACEMENT FLUID:107 BBLS OF LOW VIS 8.6 PPG QUICKDRIL-N -DID NOT OBSERVE LATCH ;-REDUCE RATE TO 2 BPM PRIOR TO PLUG BUMP:FINAL CIRCULATING PRESSURE 1180 PSI -TOTAL DISPLACEMENT VOLUME 107.8 BBLS ! -NO LOSSES WHILE PUMPING CEMENT -INCREASE PRESSURE TO 2000 PSI TO SET HANGER AFTER PLUG BUMP -SET DOWN 60K TO CONFIRM HANGER SET -CHECK FLOATS-GOOD -PRESSURE UP TO 4500 PSI TO SET PACKER AND RELEASE FROM HANGER,PUSHER TOOL NEUTRALIZED AT 3600 PSI -PU TO EXPOSE DOG SUB AND SET DOWN ON LINER TOP 50K,20 RPM -PRESSURE UP TO 700 PSI AND PU TO REMOVE RS PACK-OFF AND CIRCULATE EXCESS CEMENT OFF LINER TOP -PU RUNNING TOOL ABOVE LINER TOP AND MARK NO-GO.CIRCULATE 1X BU AT 14 BPM, 1650 PSI --8 BBLS OF EXCESS CEMENT TO SURFACE ON BOTTOMS UP -CIP AT 02:22. 1000 PSI COMPRESSIVE STRENGTH AT 13:45 ON 11/18/14 -FIELD ESTIMATE FOR TOC=LINER TOP AT 9549'MD Printed 12/1/2014 11:34:10AM North America-ALASKA-BP Page 3 of 5 Operation Summary Report Common Well Name:N-28 AFE No Event Type:COM-ONSHORE(CON) Start Date:11/17/2014 End Date: 11/20/2014 X3-015JN-C:(2,362,031.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date!Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:30 - 05:30 2.00 CASING P RUNPRD RIG DOWN BAKER CEMENT HEAD AND DISPLACE WELL ABOVE LINER TOP FROM 8.5 PPG QUICKDRIL-N MUD TO 8.5 PPG SEAWATER -550 GPM,2100-2385 PSI,RECIPROCATE FULL STAND -NO ROTATION PER BAKER REP 05:30 - 14:00 8.50 CASING P RUNPRD PULL OUT OF HOLE WITH LINER RUNNING ASSEMBLY FROM TOL AT 9549'MD TO 4400' MD,LAYING DOWN 4"DRILLPIPE. -MONITOR WELL FOR 10 MIN PRIOR TO PULLING OUT OF HOLE(STATIC) 14:00 - 15:00 1.00 CASING P RUNPRD PRESSURE TEST 4-1/2"LINER TOP PACKER TO 250 PSI LOW FOR 5 MIN/4000 PSI HIGH FOR 30 MIN-PASSED -SEE ATTACHED TEST CHART -TEST APPROVED BY BP ODE 15:00 - 19:30 4.50 CASING P RUNPRD PULL OUT OF HOLE WITH LINER RUNNING ASSEMBLY FROM 4400'MD TO SURFACE, LAYING DOWN 4"DRILLPIPE. -LAY DOWN BAKER LINER HANGER RUNNING TOOL,DOG SUB SHEARED 19:30 - 21:00 1.50 RUNCOM P RUNCMP RIG UP TUBING RUNNING EQUIPMENT CHANGE OUT BX ELEVATORS TO SIDE DOOR ELEVATORS,VERIFY PROPER SIZE FOR PIPE BEING PICKED UP-WITNESSED BY PARKER RIG MANAGER -CHANGE OUT PS-21 INSERTS TO 4-1/2" -RIG UP CASING TONGS 21:00 - 00:00 3.00 RUNCOM P RUNCMP RUN 4-1/2',12.6#,13CR-85,VAMTOP COMPLETION TUBING TO 950'MD -USE JET LUBE SEAL GAURD PIPE DOPE -TORQUE CONNECTIONS TO 4,440 FT-LBS -BAKERLOKALL CONNECTIONS BELOW THE PACKER -RUN IN HOLE AT 90 FT/MIN -PU 45K,SO 40K -MUD WEIGHT:8.5 PPG IN,8.5 PPG OUT 11/19/2014 00:00 - 09:00 9.00 RUNCOM P RUNCMP RUN 4-1/2",12.6#,13CR-85,VAMTOP COMPLETION TUBING FROM 950'MD TO 9474' MD -USE JET LUBE SEAL GUARD PIPE DOPE -TORQUE CONNECTIONS TO 4,440 FT-LBS -PU 141K,SO 108K AT 9474'MD Printed 12/1/2014 11:34:10AM North America-ALASKA-BP Page 4 of 5 Operation Summary Report Common Well Name:N-28 AFE No Event Type:COM-ONSHORE(CON) Start Date:11/17/2014 End Date:11/20/2014 X3-015JN-C:(2,362,031.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00:00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. i UWI:500292352400 Active datum:N-28 cc91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 109:00 - 11:00 2.00 RUNCOM P RUNCMP TAG BOTTOM OF RECEPTACLE 7'IN ON JOINT 223 AT 9565'MD.SET DOWN 7K TO CONFIRM.PICK UP TO ATTEMPT TO TAG TOP OF LINER,NO INDICATION.TAG BOTTOM OF RECEPTACLE AGAIN 7'IN ON JOINT 223.PICK UP ABOVE TOP OF LINER,ROTATE STRING 1/2 TURN AND ATTEMPT TO TAG TOP OF LINER,NO INDICATION.SET BACK DOWN AND TAG BOTTOM OF RECEPTACLE 7'IN ON JOINT 223. -LAY DOWN JOINTS 222 AND 223. -CHANGE OUT ELEVATORS,RIG MANAGER CONFIRMED CORRECT SIZED ELEVATORS. -BUILD LANDING JOINT AND DRAIN STACK -MAKE UP HANGER AND,LANDING JOINT. FMC REPRESENTATIVE INSPECT AND LAND HANGER. -WLEG AT 9562'MD -FMC REPRESENTATIVE RUN IN LOCK DOWN SCREWS. -RIG DOWN DOYON CASING,RIG UP SECONDARY KILL IN THE WELL HOUSE,RIG DOWN LANDING JOINT AND LAY DOWN. 11:00 - 14:00 3.00 RUNCOM P RUNCMP REVERSE CIRCULATE 147 BBLS OF HEATED SEAWATER AT 4 BPM AT 490 PSI -FOLLOW WITH 57 BBLS OF CORROSION INHIBITED SEAWATER AT 4 BPM 540 PSI -FOLLOW WITH 124 BBLS OF HEATED SEAWATER AT 4 BPM 520 PSI -REVERSE IN EXTRA 5 BBLS OF SEAWATER AND THEN CIRCULATE 5 BBLS THE LONG WAY TO WASH OFF THE RHC PLUG. 14:00 - 15:30 1.50 RUNCOM P RUNCMP -DROP BALL AND ROD AND PRESSURE UP TO :SET PACKER 1-AOGCC REPRESENTATIVE JOHN CRISP WAIVED WITNESS TO MIT-IA TEST -TEST TUBING TO 250 PSI LOW FOR 5 MINUTES AND 4000 PSI HIGH FOR 30 MINUTES-PASSED -BLEED TUBING PRESSURE DOWN TO 2500 PSI -TEST ANNULUS TO 250 PSI LOW FOR 5 MINUTES AND 4000 PSI HIGH FOR 30 MINUTES-PASSED -RECEIVED WTL APPROVAL TO PROCEED 15:30 - 16:00 0.50 RUNCOM P RUNCMP -BLEED OFF TUBING PRESSURE TO SHEAR DCK VALVE IN GLM#4,SHEARED AT 1700 PSI 'DIFFERENTIAL -PUMP 93 GPM AT 770 PSI DOWN THE IA AND THEN PUMP 93 GPM AT 820 PSI DOWN THE TUBING TO CONFIRM COMMUNICATION 16:00 - 19:00 3.00 RUNCOM P RUNCMP RIG UP TO FREEZE PROTECT AND THEN REVERSE IN 74 BBLS OF DIESEL -ALLOW TO U-TUBE FOR 1.5 HOURS Printed 12/1/2014 11:34:10AM • North America-ALASKA-BP • Page 5 of 5 Operation Summary Report Common Well Name:N-28 AFE No Event Type:COM-ONSHORE(CON) Start Date:11/17/2014 End Date:11/20/2014 X3-015JN-C:(2,362,031.00) Project:Prudhoe Bay Site:PB N Pad Rig Name/No.:PARKER 272 Spud Date/Time:10/31/2014 3:00.00AM Rig Release:11/20/2014 Rig Contractor:PARKER DRILLING CO. UWI:500292352400 Active datum:N-28 @91.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 20:30 1.50 WHSUR P RUNCMP INSTALL AND TEST TWO WAY CHECK -SUCK OUT STACK -DRY ROD IN TWO WAY CHECK -TEST TWO WAY CHECK AGAINST BLIND RAMS FROM ABOVE 250 PSI LOW FOR 5 MINUTES AND 3500 PSI HIGH FOR FIVE MINUTES-PASSED -TEST FROM BELOW THROUGH THE IA TO 250 LOW FOR 5 MINUTES AND 3500 PSI HIGH FOR 5 MINUTES-PASSED 20:30 - 22:30 2.00 WHSUR P RUNCMP -SUCK OUT STACK -BREAK DOWN AND LAY DOWN LANDING JOINT -BLOW DOWN ALL SURFACE LINES AND EQUIPMENT 22:30 - 00:00 1.50 BOPSUR P RUNCMP -PULL PS-21'S AND CLEAN OUT FLOW BOX -PULL MOUSEHOLES -BEGIN TO NIPPLE DOWN BOPE -BEGIN TO CLEAR AND CLEAN RIG FLOOR 11/20/2014 00:00 - 03:30 3.50 BOPSUB P RUNCMP NIPPLE DOWN BOPE -PJSM -RIG DOWN TURN BUCKLES REMOVE BOPE STACK AND RACK BACK ,-REMOVE HIGH PRESSURE RISER -RIG DOWN LINES THROUGHOUT THE RIG SIMOPS: -BRING 10-3/4"CASING INTO PIPE SHED 03:30 09:30 6.00 WHSUR P RUNCMP INSTALL AND TEST TREE -REMOVE DUAL STUD ADAPTER -FMC REP INSPECT HANGER NECK AND HANGER NECK SEALS.INSTALL ADAPTER FLANGE AND TREE TO TUBING SPOOL AND NIPPLE UP. -REVIEWED PRESSURE CROSSCHECK PRIOR TO TREE TEST -FMC TEST ADAPTER FLANGE VOID TO 250 PSI LOW 5 MINUTES,5000 PSI HIGH FOR 30 MINUTES-PASSED -FILL TREE WITH DIESEL TO PERFORM VISUAL LEAK TIGHT TEST TO 250 LOW 5 MINUTES,5000 PSI HIGH FOR 5 MINUTES- PASSED -DRAIN TREE,LOAD TREE WITH 3 CANS OF HEET ON TOP OF TWC. SIMOPS: CONTINUE TO BRING 10-3/4"CASING INTO PIPE SHED 09:30 - 12:00 2.50 RIGD P RUNCMP -CLEAN AND SECURE WELLHOUSE -CLEAN AND ORGANIZE RIG -CONTINUE TO BRING 10-3/4"CASING INTO PIPE SHED RIG RELEASED AT 12:00 11/20/2014 Printed 12/1/2014 11:34:10AM • • N-28, Well History (Post-Rig Sidetrack) T/I/O=TWC/0/0. Removed temp valve#6, Installed 4 1/8"CIW Upper tree, Pull 4"CIW TWC#292, post Parker 272. No Temp valves on IA/OA. Final WHP's Vac/0/0. ***Job Complete***See log. 12/1/2014 Tree and Wellbore Is fluid packed. T/UO= Unk/0/0. Temp= SI. Verify AFE sign(WIC request). No AL,flowline,wellhouse, or scaffold. No AFE sign hung. Caution tags hung on IA&OA. 12/13/2014 SV&WV= Unk. SSV&MV=C. IA&OA=OTG. 0430 hrs. T/I/O= Unk/0/0. Temp=SI. WHPs Hang AFE sign(WIC request). No AL,flowline,wellhouse, or scaffold. Hung AFE. Caution tags hung on IA&OA. SV&WV= Unk. SSV=C. MV=O. IA&OA= OTG. 16:00 12/13/2014 ***WELL S/I ON ARRIVAL SWCP 4521***(new well) RIG UP/WEATHER STAND BY. 9/15/2015 ***CONTINUE WSR TO 9/16/15*** T/I/O=5/13/-4 Temp=S/I Assist SLB w/MIT IA to 2500 PSI, PASSED(New well post)Pumped 2.17 bbls 60/40MW to test. 1st 15 min IAP lost 62&2nd 15 min IAP lost 13 for a total IAP loss of 75 in 30 min. Bled back—2 bbls. FWHP's=5/10/vac Upon departure DSO notified SLB on well&in control of all WHV's 9/16/2015 ***Tags hung on IA and Wing. Fluid packed annulus sign hung on wing. ***CONTINUE WSR FROM 9/15/15 SWCP 4521***(new well) WEATHER STAND BY. PULL BAL&ROD FROM 9,503'SLM. PULL BK-DCK-2 FROM ST#4 @ 6,356'SLM(6,391'MD). SET BK-DGLV IN ST#4 @ 6,356'SLM(6,391'MD). PULL RHC FROM 9,509'SLM(9,549'MD). 9/16/2015 ***CONTINUE WSR TO 9/17/15*** ***CONTINUE WSR FROM 9/16/15 SWCP 4521***(new well) DRIFT CLEAN W/30'x 3-3/8"DUMMY GUN TO 10,160'SLM. RAN RPM TOOL, MADE PASSES AS PER PROGRAM, REC GOOD DATA, RDMO 9/17/2015 *****LEFT WELL SHUT IN,TURNED WELL OVER TO PAD OPER.***** ***WELL S/I UPON ARRIVAL***(ELINE SCMT-ADD PERFS) INITIAL T/I/O=0/100/0. RU/PT. RIH WITH SCMT TOOLSTRING. FREE PIPE NORMALIZATION AT 9000FT. ***JOB CONTINUED ON 19-SEPT-2015*** 9/18/2015 ***JOB CONTINUED FROM 18-SEPT-2015*** LOG MAIN AND REPEAT PASS WITH SCMT FROM 10200'-9500'AT 30FPM. ADDITIONAL LOGGING INTERVAL REQUIRED FOR CORRELATION. UPLOAD DATA IN REALTIME FOR TOWN REVIEW. POOH. RUN 2: INTERVAL= 10045-10051'. SHOTS CONFIRMED FIRED AT SURFACE. RUN 3: INTERVAL= 10014-10020'. SHOTS CONFIRMED FIRED AT SURFACE. RUN 4: INTERVAL=9975'-9980'. SHOTS CONFIRMED FIRED AT SURFACE. RUN 5: INTERVAL=9917'-9930'. SHOTS CONFIRMED FIRED AT SURFACE. RUN 6: INTERVAL=9883'-9894'. SHOTS CONFIRMED FIRED AT SURFACE. API GUN DATA: 3.375"PowerJet HMX 6SPF 60 Deg Phasing RD ELINE.WELL SI AND SECURE. HAND OVER TO DSO. FINAL T/I/O=0/0/40 PSI *** JOB COMPLETED ON 19-SEPT-2015*** 9/19/2015 • Qbp North America - ALASKA - BP Prudhoe Bay PB N Pad N-28 500292352400 N-28 Design: N-28 Survey Report - Geographic 18 November, 2014 r'1 BAKER HUGHES • S ri.II 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well N-28 Project: Prudhoe Bay TVD Reference: N-28 @ 91.00usft(Parker 272) Site: PB N Pad MD Reference: N-28 @ 91.00usft(Parker 272) Well: N-28 North Reference: True Wellbore: N-28 Survey Calculation Method: Minimum Curvature • Design: N-28 Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) • System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) • Using Well Reference Point Map Zone: Alaska Zone 04 • Using geodetic scale factor Site PB N Pad,TR-11-13 Site Position: Northing: 5,965,420.89 usft Latitude: 70°18'48.671 N From: Map Easting: 633,404.63 usft Longitude: 148°55'7.73 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.02 ° Well N-28 API No. 500292352400 Well Position +NI-S 0.00 usft Northing: 5,967,387.55 usft • Latitude: 70°19'7.835 N +E/-W 0.00 usft Easting: 634,410.37 usft • Longitude: 148°54'37.36 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: • 43.90 usft Wellbore N-28 API no. 500292352400 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (0) (0) (nT) BGG M2014 11/15/2014 19.48 81.00 57,593 Design N-28 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 47.10 Vertical Section: Depth From(ND) +N/-S +E/•W Direction (usft) (usft) (usft) (0) 47.10 0.00 0.00 307.49 Survey Program Date: 11/18/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 99.50 721.03 Gyro SS(N-28) GYD-GC-SS Gyrodata gyro single shots 797.58 10,394.47 OTK+MS(N-28) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 11/18/2014 9:49:25AM Page 2 COMPASS 5000.1 Build 61 i i Iran 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well N-28 Project: Prudhoe Bay TVD Reference: N-28 @ 91.00usft(Parker 272) Site: PB N Pad MD Reference: N-28 @ 91.00usft(Parker 272) Well: N-28 North Reference: True Wellbore: N-28 Survey Calculation Method: Minimum Curvature Design: N-28 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 47.10 0.00 0.00 47.10 0.00 0.00 5,967,387.55 634,410.37 70°19'7.835 N 148°54'37.36 W 99.50 0.12 347.41 99.50 0.05 -0.01 5,967,387.60 634,410.36 70°19'7.836 N 148°54'37.36 W 170.50 0.19 275.16 170.50 0.14 -0.15 5,967,387.68 634,410.22 70°19'7.836 N 148°54'37.37 W 192.50 0.06 304.79 192.50 0.15 -0.19 5,967,387.69 634,410.18 70°19'7.836 N 148°54'37.37 W 242.85 0.19 308.41 242.85 0.21 -0.28 5,967,387.76 634,410.09 70°19'7.837 N 148°54'37.37 W 315.50 0.29 8.21 315.50 0.47 -0.35 5,967,388.01 634,410.02 70°19'7.840 N 148°54'37.37 W 365.50 0.37 62.36 365.50 0.67 -0.19 5,967,388.22 634,410.17 70°19'7.842 N 148°54'37.37 W 415.50 0.44 73.06 415.50 0.80 0.14 5,967,388.35 634,410.50 70°19'7.843 N 148°54'37.36 W 470.00 0.68 64.36 469.99 1.00 0.63 5,967,388.56 634,410.99 70°19'7.845 N 148°54'37.34 W 520.00 0.78 60.37 519.99 1.30 1.20 5,967,388.87 634,411.54 70°19'7.848 N 148°54'37.33 W 554.00 0.81 53.54 553.99 1.56 1.59 5,967,389.13 634,411.93 70°19'7.850 N 148°54'37.31 W 597.03 1.19 90.51 597.01 1.73 2.28 5,967,389.32 634,412.62 70°19'7.852 N 148°54'37.29 W 609.00 1.33 97.84 608.98 1.71 2.54 5,967,389.31 634,412.88 70°19'7.852 N 148°54'37.29 W 637.00 3.28 107.00 636.95 1.43 3.63 5,967,389.05 634,413.98 70°19'7.849 N 148°54'37.26 W 665.00 5.07 104.75 664.88 0.88 5.59 5,967,388.53 634,415.95 70°19'7.844 N 148°54'37.20 W 704.00 6.74 104.67 703.67 -0.13 9.48 5,967,387.59 634,419.85 70°19'7.834 N 148°54'37.08 W 721.03 7.33 103.50 720.57 -0.64 11.50 5,967,387.12 634,421.88 70°19'7.829 N 148°54'37.03 W 797.58 8.12 107.18 796.43 -3.38 21.41 5,967,384.56 634,431.84 70°19'7.802 N 148°54'36.74 W 886.57 9.54 102.24 884.36 -6.80 34.62 5,967,381.37 634,445.11 70°19'7.768 N 148°54'36.35 W 982.70 10.67 106.21 979.00 -10.97 50.96 5,967,377.49 634,461.51 70°19'7.727 N 148°54'35.87 W 1,076.83 11.44 107.46 1,071.38 -16.20 68.23 5,967,372.57 634,478.87 70°19'7.676 N 148°54'35.37 W 1,169.99 11.99 109.95 1,162.60 -22.28 86.14 5,967,366.82 634,496.89 70°19'7.616 N 148°54'34.85 W 1,265.41 12.86 115.14 1,255.79 -30.17 105.07 5,967,359.27 634,515.95 70°19'7.538 N 148°54'34.30 W 1,360.50 14.20 116.33 1,348.24 -39.84 125.10 5,967,349.96 634,536.16 70°19'7.443 N 148°54'33.71 W 1,455.55 15.04 115.46 1,440.21 -50.31 146.69 5,967,339.88 634,557.92 70°19'7.340 N 148°54'33.08 W 1,549.68 13.89 115.64 1,531.35 -60.45 167.90 5,967,330.12 634,579.31 70°19'7.240 N 148°54'32.46 W 1,643.23 13.73 114.98 1,622.20 -70.00 188.09 5,967,320.93 634,599.66 70°19'7.147 N 148°54'31.87 W 1,734.87 13.74 115.30 1,711.22 -79.24 207.78 5,967,312.05 634,619.52 70°19'7.056 N 148°54'31.30 W 1,831.58 15.94 114.42 1,804.70 -89.64 230.26 5,967,302.05 634,642.18 70°19'6.953 N 148°54'30.64 W 1,926.93 16.11 115.04 1,896.34 -100.65 254.17 5,967,291.47 634,666.28 70°19'6.845 N 148°54'29.94 W 2,017.67 15.55 115.97 1,983.64 -111.31 276.51 5,967,281.22 634,688.81 70°19'6.740 N 148°54'29.29 W 2,112.45 15.17 115.30 2,075.04 -122.17 299.14 5,967,270.76 634,711.63 70°19'6.633 N 148°54'28.63 W 2,208.85 14.69 114.38 2,168.18 -132.61 321.68 5,967,260.73 634,734.35 70°19'6.531 N 148°54'27.98 W 2,303.10 14.31 115.86 2,259.43 -142.62 343.05 5,967,251.10 634,755.89 70°19'6.432 N 148°54'27.35 W 2,398.01 14.19 116.26 2,351.42 -152.88 364.03 5,967,241.22 634,777.05 70°19'6.331 N 148°54'26.74 W 2,491.63 16.44 112.80 2,441.71 -163.10 386.54 5,967,231.41 634,799.74 70°19'6.231 N 148°54'26.08 W 2,586.83 16.62 111.91 2,532.98 -173.40 411.59 5,967,221.56 634,824.97 70°19'6.130 N 148°54'25.35 W 2,679.87 16.32 112.73 2,622.20 -183.41 435.99 5,967,211.99 634,849.54 70°19'6.031 N 148°54'24.64 W 2,776.44 16.27 112.76 2,714.89 -193.89 460.98 5,967,201.96 634,874.71 70°19'5.928 N 148°54'23.91 W 2,870.83 15.80 113.57 2,805.61 -204.14 484.95 5,967,192.14 634,898.86 70°19'5.827 N 148°54'23.21 W 2,968.93 15.62 113.43 2,900.04 -214.74 509.31 5,967,181.98 634,923.40 70°19'5.723 N 148°54'22.50 W 3,058.34 15.27 112.80 2,986.22 -224.08 531.21 5,967,173.03 634,945.46 70°19'5.631 N 148°54'21.86 W 3,122.63 15.25 113.11 3,048.25 -230.68 546.79 5,967,166.71 634,961.16 70°19'5.566 N 148°54'21.41 W 3,175.00 15.06 113.26 3,098.80 -236.07 559.38 5,967,161.55 634,973.84 70°19'5.513 N 148°54'21.04 W Surface Casing 3,229.74 14.86 113.42 3,151.68 -241.67 572.35 5,967,156.18 634,986.91 70°19'5.458 N 148°54'20.66 W 3,330.73 16.07 115.24 3,249.01 -252.78 596.88 5,967,145.52 635,011.63 70°19'5.349 N 148°54'19.95 W 3,425.29 19.29 118.43 3,339.10 -265.80 622.46 5,967,132.96 635,037.44 70°19'5.221 N 148°54'19.20 W 3,526.35 21.56 121.74 3,433.80 -283.52 652.93 5,967,115.79 635,068.22 70°19'5.046 N 148°54'18.31 W 3,613.94 23.18 121.74 3,514.80 -301.05 681.28 5,967,098.77 635,096.88 70°19'4.874 N 148°54'17.48 W 3,709.18 25.97 122.96 3,601.40 -322.26 714.73 5,967,078.16 635,130.70 70°19'4.665 N 148°54'16.51 W 3,803.52 28.44 125.79 3,685.30 -346.64 750.29 5,967,054.42 635,166.68 70°19'4.425 N 148°54'15.47 W 3,897.43 31.37 128.53 3,766.70 -374.96 787.56 5,967,026.78 635,204.45 70°19'4.147 N 148°54'14.38 W 3,991.95 34.00 128.90 3,846.25 -406.88 827.38 5,966,995.58 635,244.83 70°19'3.833 N 148°54'13.22 W 4,087.04 36.94 131.86 3,923.69 -442.66 869.36 5,966,960.57 635,287.45 70°19'3.481 N 148°54'12.00 W 11/18/2014 9:49:25AM Page 3 COMPASS 5000.1 Build 61 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well N-28 Project: Prudhoe Bay TVD Reference: N-28 @ 91.00usft(Parker 272) Site: PB N Pad MD Reference: N-28 @ 91.00usft(Parker 272) Well: N-28 North Reference: True Wellbore: N-28 Survey Calculation Method: Minimum Curvature Design: N-28 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 4,181.58 40.11 132.10 3,997.64 -482.04 913.13 5,966,921.97 635,331.91 70°19'3.094 N 148°54'10.72 W 4,276.29 41.54 133.16 4,069.31 -523.98 958.67 5,966,880.86 635,378.19 70°19'2.681 N 148°54'9.39 W 4,369.76 41.51 134.08 4,139.29 -566.72 1,003.53 5,966,838.93 635,423.81 70°19'2.261 N 148°54'8.08 W 4,464.14 41.59 133.49 4,209.92 -610.04 1,048.72 5,966,796.43 635,469.77 70°19'1.835 N 148°54'6.76 W 4,559.58 41.56 133.30 4,281.32 -653.55 1,094.74 5,966,753.76 635,516.55 70°19'1.407 N 148°54'5.42 W 4,653.70 41.47 133.56 4,351.79 -696.44 1,140.05 5,966,711.69 635,562.62 70°19'0.985 N 148°54'4.10 W 4,748.46 41.44 132.57 4,422.81 -739.27 1,185.88 5,966,669.69 635,609.20 70°19'0.563 N 148°54'2.76 W 4,842.59 41.53 133.15 4,493.33 -781.69 1,231.59 5,966,628.10 635,655.66 70°19'0.146 N 148°54'1.43 W 4,936.58 41.42 132.55 4,563.75 -824.02 1,277.22 5,966,586.59 635,702.04 70°18'59.730 N 148°54'0.10 W 5,032.07 41.50 132.11 4,635.31 -866.60 1,323.96 5,966,544.87 635,749.53 70°18'59.311 N 148°53'58.73 W 5,126.14 41.36 131.78 4,705.84 -908.20 1,370.26 5,966,504.10 635,796.56 70°18'58.902 N 148°53'57.38 W 5,220.89 41.41 130.80 4,776.93 -949.54 1,417.33 5,966,463.62 635,844.36 70°18'58.495 N 148°53'56.01 W 5,316.28 41.55 129.94 4,848.40 -990.46 1,465.46 5,966,423.57 635,893.21 70°18'58.093 N 148°53'54.61 W 5,410.62 41.49 129.70 4,919.03 -1,030.51 1,513.49 5,966,384.39 635,941.95 70°18'57.699 N 148°53'53.20 W 5,505.47 41.41 130.01 4,990.13 -1,070.74 1,561.69 5,966,345.02 635,990.86 70°18'57.303 N 148°53'51.80 W 5,599.77 42.39 129.97 5,060.32 -1,111.22 1,609.94 5,966,305.43 636,039.82 70°18'56.905 N 148°53'50.39 W 5,694.90 42.31 130.01 5,130.62 -1,152.40 1,659.04 5,966,265.13 636,089.65 70°18'56.499 N 148°53'48.96 W 5,789.39 42.40 130.36 5,200.45 -1,193.48 1,707.68 5,966,224.93 636,139.01 70°18'56.095 N 148°53'47.54 W 5,883.68 42.39 131.28 5,270.08 -1,235.03 1,755.79 5,966,184.25 636,187.85 70°18'55.687 N 148°53'46.14 W 5,978.70 42.36 131.82 5,340.28 -1,277.51 1,803.71 5,966,142.64 636,236.52 70°18'55.269 N 148°53'44.74 W 6,073.50 42.35 133.16 5,410.34 -1,320.65 1,850.81 5,966,100.36 636,284.38 70°18'54.844 N 148°53'43.36 W 6,168.08 42.26 133.81 5,480.29 -1,364.46 1,897.00 5,966,057.39 636,331.34 70°18'54.413 N 148°53'42.02 W 6,261.54 42.17 134.72 5,549.50 -1,408.29 1,941.96 5,966,014.37 636,377.08 70°18'53.982 N 148°53'40.71 W 6,356.60 42.19 134.90 5,619.95 -1,453.27 1,987.25 5,965,970.21 636,423.16 70°18'53.540 N 148°53'39.39 W 6,451.49 42.23 135.40 5,690.23 -1,498.47 2,032.21 5,965,925.83 636,468.92 70°18'53.095 N 148°53'38.07 W 6,546.43 42.17 135.65 5,760.56 -1,543.97 2,076.89 5,965,881.13 636,514.40 70°18'52.647 N 148°53'36.77 W 6,640.26 42.11 135.25 5,830.14 -1,588.84 2,121.05 5,965,837.07 636,559.36 70°18'52.206 N 148°53'35.48 W 6,735.28 42.16 135.48 5,900.60 -1,634.20 2,165.84 5,965,792.52 636,604.95 70°18'51.760 N 148°53'34.18 W 6,829.98 42.16 135.37 5,970.80 -1,679.48 2,210.45 5,965,748.05 636,650.36 70°18'51.314 N 148°53'32.88 W 6,924.70 42.40 135.21 6,040.88 -1,724.76 2,255.28 5,965,703.58 636,695.99 70°18'50.869 N 148°53'31.57 W 7,019.39 41.33 133.88 6,111.40 -1,769.09 2,300.31 5,965,660.07 636,741.81 70°18'50.433 N 148°53'30.25 W 7,113.53 39.53 133.91 6,183.06 -1,811.42 2,344.31 5,965,618.54 636,786.55 70°18'50.016 N 148°53'28.97 W 7,209.48 37.15 134.11 6,258.31 -1,852.77 2,387.11 5,965,577.96 636,830.08 70°18'49.609 N 148°53'27.72 W 7,303.44 33.60 134.88 6,334.91 -1,890.88 2,425.92 5,965,540.56 636,869.56 70°18'49.235 N 148°53'26.59 W 7,398.29 30.16 138.23 6,415.45 -1,927.18 2,460.40 5,965,504.89 636,904.69 70°18'48.877 N 148°53'25.59 W 7,492.97 27.38 144.40 6,498.45 -1,962.64 2,488.93 5,965,469.95 636,933.84 70°18'48.529 N 148°53'24.75 W 7,587.75 26.75 149.65 6,582.86 -1,998.77 2,512.40 5,965,434.24 636,957.95 70°18'48.173 N 148°53'24.07 W 7,682.67 26.50 153.84 6,667.72 -2,036.21 2,532.53 5,965,397.17 636,978.75 70°18'47.805 N 148°53'23.48 W 7,777.30 25.48 158.71 6,752.79 -2,074.13 2,549.23 5,965,359.56 636,996.13 70°18'47.432 N 148°53'23.00 W 7,871.53 25.21 165.23 6,837.97 -2,112.43 2,561.71 5,965,321.49 637,009.29 70°18'47.055 N 148°53'22.63 W 7,966.58 25.23 171.85 6,923.98 -2,152.07 2,569.74 5,965,282.01 637,018.03 70°18'46.665 N 148°53'22.40 W 8,061.08 25.59 174.53 7,009.34 -2,192.32 2,574.54 5,965,241.85 637,023.55 70°18'46.269 N 148°53'22.26 W 8,155.69 25.91 175.42 7,094.55 -2,233.27 2,578.14 5,965,200.98 637,027.88 70°18'45.867 N 148°53'22.15 W 8,250.08 25.90 176.02 7,179.46 -2,274.39 2,581.22 5,965,159.92 637,031.69 70°18'45.462 N 148°53'22.06 W 8,346.58 25.95 176.90 7,266.25 -2,316.49 2,583.82 5,965,117.87 637,035.05 70°18'45.048 N 148°53'21.99 W 8,438.98 25.99 176.50 7,349.32 -2,356.89 2,586.15 5,965,077.53 637,038.10 70°18'44.651 N 148°53'21.92 W 8,533.81 25.93 175.69 7,434.58 -2,398.30 2,588.98 5,965,036.18 637,041.67 70°18'44.244 N 148°53'21.84 W 8,628.62 25.21 172.70 7,520.11 -2,439.00 2,593.10 5,964,995.56 637,046.52 70°18'43.843 N 148°53'21.72 W 8,723.10 25.22 171.54 7,605.59 -2,478.87 2,598.62 5,964,955.80 637,052.75 70°18'43.451 N 148°53'21.56 W 8,817.67 25.25 170.29 7,691.13 -2,518.68 2,604.99 5,964,916.11 637,059.83 70°18'43.060 N 148°53'21.37 W 8,912.66 25.03 170.23 7,777.12 -2,558.46 2,611.81 5,964,876.47 637,067.37 70°18'42.668 N 148°53'21.18 W 9,007.36 24.99 170.83 7,862.94 -2,597.95 2,618.40 5,964,837.11 637,074.66 70°18'42.280 N 148°53'20.98 W 9,102.13 25.01 171.41 7,948.83 -2,637.52 2,624.58 5,964,797.66 637,081.55 70°18'41.891 N 148°53'20.80 W 9,196.20 25.00 171.25 8,034.09 -2,676.83 2,630.58 5,964,758.47 637,088.24 70°18'41.504 N 148°53'20.63 W 9,291.52 24.99 171.14 8,120.48 -2,716.63 2,636.74 5,964,718.78 637,095.12 70°18'41.113 N 148°53'20.45 W 11/18/2014 9:49:25AM Page 4 COMPASS 5000.1 Build 61 r 111.11 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well N-28 Project: Prudhoe Bay TVD Reference: N-28 @ 91.00usft(Parker 272) Site: PB N Pad MD Reference: N-28 @ 91.00usft(Parker 272) Well: N-28 North Reference: True Wellbore: N-28 Survey Calculation Method: Minimum Curvature Design: N-28 Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,385.19 24.98 170.98 8,205.38 -2,755.71 2,642.89 5,964,679.82 637,101.97 70°18'40.728 N 148°53'20.27 W 9,480.52 25.01 171.11 8,291.79 -2,795.50 2,649.16 5,964,640.15 637,108.95 70°18'40.337 N 148°53'20.09 W 9,575.08 24.88 170.64 8,377.52 -2,834.88 2,655.49 5,964,600.90 637,115.98 70°18'39.950 N 148°53'19.90 W 9,637.66 24.97 170.55 8,434.28 -2,860.90 2,659.80 5,964,574.96 637,120.75 70°18'39.694 N 148°53'19.78 W 9,694.47 25.12 170.18 8,485.74 -2,884.61 2,663.82 5,964,551.33 637,125.20 70°18'39.461 N 148°53'19.66 W 9,720.00 25.58 168.86 8,508.82 -2,895.35 2,665.81 5,964,540.62 637,127.38 70°18'39.355 N 148°53'19.60 W Intermediate Casing 9,741.80 25.98 167.77 8,528.45 -2,904.64 2,667.73 5,964,531.37 637,129.47 70°18'39.264 N 148°53'19.55 W 9,802.02 25.79 171.73 8,582.63 -2,930.49 2,672.41 5,964,505.61 637,134.61 70°18'39.009 N 148°53'19.41 W 9,896.35 25.76 169.08 8,667.58 -2,970.93 2,679.24 5,964,465.31 637,142.16 70°18'38.612 N 148°53'19.21 W 9,990.71 25.86 168.44 8,752.52 -3,011.22 2,687.25 5,964,425.16 637,150.89 70°18'38.215 N 148°53'18.98 W 10,085.23 25.69 168.05 8,837.64 -3,051.46 2,695.62 5,964,385.08 637,159.98 70°18'37.819 N 148°53'18.74 W 10,179.51 25.53 167.21 8,922.66 -3,091.27 2,704.35 5,964,345.45 637,169.42 70°18'37.428 N 148°53'18.48 W 10,273.72 25.51 167.27 9,007.68 -3,130.85 2,713.32 5,964,306.03 637,179.09 70°18'37.039 N 148°53'18.22 W 10,367.54 25.29 167.19 9,092.43 -3,170.10 2,722.21 5,964,266.95 637,188.69 70°18'36.653 N 148°53'17.96 W 10,394.47 24.93 169.24 9,116.81 -3,181.28 2,724.55 5,964,255.81 637,191.23 70°18'36.543 N 148°53'17.89 W 10,451.00 . 24.93 169.24 9,168.08- -3,204.69 2,729.00 5,964,232.49 637,196.09 70°18'36.312 N 148°53'17.76 W Projection to TD-Production Liner Targets Target Name -hit/miss target Dip Angle Dip Dir. TVD +N/-S +E/-W Northing Easting -Shape (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude N-28 Tgt2 0.00 0.00 9,166.00 -3,139.05 2,834.11 5,964,300.00 637,300.00 70°18'36.958 N 148°53'14.70 W -actual wellpath misses target center by 122.19usft at 10430.21 usft MD(9149.22 TVD,-3196.08 N,2727.36 E) -Point N-28 GeoPoly 0.00 0.00 8,691.00 -2,976.37 2,686.98 5,964,460.00 637,150.00 70°18'38.558 N 148°53'18.99 W -actual wellpath misses target center by 7.70usft at 9920.42usft MD(8689.25 TVD,-2981.20 N,2681.24 E) -Circle(radius 250.00) N-28 Tgt1 0.00 0.00 8,516.00 -2,915.30 2,628.06 5,964,520.00 637,090.00 70°18'39.159 N 148°53'20.70 W -actual wellpath misses target center by 41.68usft at 9731.64usft MD(8519.31 TVD,-2900.30 N,2666.81 E) -Point 3,175.00 3,098.80 Surface Casing 9.625 12.250 9,720.00 8,508.82 Intermediate Casing 7.000 8.500 10,451.00 9,168.08 Production Liner 4.500 6.125 Design Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (usft) (usft) (usft) (usft) Comment 10,451.00 9,168.08 -3,204.69 2,729.00 Projection to TD Checked By: Approved By: Date: 11/18/2014 9:49:25AM Page 5 COMPASS 5000.1 Build 61 �'D.i, /( % yttlDi 0 c Or.4.tti A/ U-I UJ a So% jam O' 7yN i_ J, zWUO' f4r7 N w O L O („) pn U o�� j ` u a OQw Zwu) C.)pO ❑m ❑ f. U�iglgar // J O X X '�jJ % 0 o/ GpffE E �. Q Q/ � o J - a O O N o tG CC r 0�l' i NN a� gO f "6 -0 U a a 0 O O O o¢ Cs/ o CO�� k ^ -� S j jo O O O� / i O N/� �/tg' N tNN%/o a • • • ;-. v %�3��% E U q o f o w o o f o w /// E v4,' • Y a7 ,G z O O o ❑ I s,4'N.t:r o - w o E ❑ ' w o O •ga4.iM . a) a.au- 2 m = 0 j 4Va%/t Et u) Q X 92 I- m Q i. } coo 4•', � a) c ct .0 o rvA rj f o U v o a ❑ o M a aP��q y� a o 00 W o o / k yl% �Hi N nFD p) � ,;,;,.:',44;.,,,--,4„...14 r a7 > O - > / w e � � ' a a) > a Y//Wh/� G � ca N .... E C M U a) a) - C') U a) a) �' 7 1,/'-P/r; , u, N � o p a) x x 3 > p a`)) x x z > y i,n• 0 ❑ W w V) a N ❑ W w a .>-> 13 R h', m m 3 Q i l a N 0 LL LL O Ne / :'L/ .3 N 3 .£ E ,�,d�YY..:: a id. 4,1ti a, '/ /�/°fir ct a' ,00 V o Ey,keM//:f,".*:,,, 444, N Q nct 6 kt ct �q rn 15 a, 4 L o) / / J N a Z f ,4 N d rn -. d • w n o a O0 /r!k / .S.4 ��j,- N U O co O) O flHII i com c x ifti 1 � 'a���✓�� a c) Z 7'y; V "f” gyri • 4 j !/ i E /�/I/ a3 X as (0 X_ a CO 0 y,. ,�itt, .r.. U 5 F O C7 U S I� (�J a fjal7„f i ld?y,� '. � ._ U a' ^KX�s,��� * g . f 0 E 0 a • /}.? t7,, yam ' �;..�. O Z 0 a' yZ o co' U Z /l/' • Y` Z Q Q o , _ 0 0 4, O yr ? U I o 15 < oow Zw W� UU , s/bQ z LL _ o rn o• /.?"Y £ m fx w c Q Q o rrm is J J 7 K W a s o W rn (O o %y�f �kz N !Y u) N a ,- cc Cl) co a7 I- 0 a - ,- (O a) ' cTi ,',54;40,444::4+ , ''E mp w a E w co a a. W z N • s Z a) J a N a c m. 12 E VI 0 m s. , v ❑ a N E E E_ �/ 5 E N .. cc;,, O U o � -o E � m N a E a) a Cao` ;k ' E aoi c m Ln a aci m 2 .E ° 2 I- w 21 > >. o 2 I- w > >. o c f.1,74--.,7: xs/, E o o c >44 . E E a) -• o' O 2 0 to H ,- ;a >, o I) ~ (O `o a � , O > O > L U O_ 'O a) -O (q d 'O a) -O to V a0 '. %, ;14 0 a W U 0 -, 0 U a a' a' ii (n a } co Q 2 0 u, (n a Y u) 6 2 0 ❑ ❑ ❑ • • 7 0 O O L N L N w Y G CD N --.2c v a s 0 a s )Y _ O NE w o O U H 2N U mLLii, 0 a w 2 Q E. ai p0. = C7 a o H p -O 2 W to O in —" O O W U L o U U U o)N 6,NI c 0 o_ c a, 3 a Fn % 'sE L5 r, m co co QC ar iN a E . o o C9 a I' "a Ef a -D L.L. O O O O OE a‘: 'O O ,La' O p O LO 0 N LO CO 0 N O w N 0 0 o p O N °O m UI p C7 O L- co i CD t/1 w w E O v a C x 0 U H O. E L N 'E 0 2 0 W o o L N .E O Z U m E p O O) m 7 U m C 0 ' n 0 )n o OO pa O w O a) a W A ON LQ Q x O O L L ammEu/ a o= 0 N a) P.....O N In °_ 1- o d' H V N co O V N Lo �. L O _O L a) 15,' _ C C N O N aC y N- E UaU N c 3 a � v- U E Wa w ^ a o oCC � am) a)tm a 01. O J C - E N i!) O 10 0 O H a N N > E 0) E)d w r Ucaaa)nimaE -vi v m m 22 EwoHp w o U F- xX ? > y y U o co > HQ CD v a a.0 _ O w a = o L = a� Q n oN m u. o 4 w 0 o y ^ oE E = N O NN' ¢ '- ta N nQ - v at V N o 5 a � Lce _ W Y oo vr W : S' NmZ ,, Y U C' co — -=-' pO{ N DD al C, a O) dv4 ON Q N Pa ZN LOo O O O O aFO U O E d Z E O a aELL no7cn r) co aZ .) a) _ Em m E D d 0 Z n (n Cr Q p �;'. N O N C N C_ (D O E .0 a) O p E o. CC 2 c c H LL a) o Z LL O cv > >0 > o w 0 D N .c N Q H 0H co cK w3 � Q oU FOi) OJ Uao J/' a0 = W a) a LELL d HU _, m O `m) a) - z U ¢ o LL a O LL ,-7.) 0, n U] p0 NN nn Op a7; Z O 3 n C' W a ---- a, � mO U H ct v L2 a O WN ZWQ o pZ pp J p W o o p <; N Q CL' O 1.... U 0. r N [D U1 p ul Z (� Y O_.-. pop z Y a O , >. Z ° LL. W v m a U cc o L E L Z L E L� oN ,..E CO W o H -9--' W H — J 7 Z o c Q r4) W U) D d N CO O a o o E o E n ami o .. a� E a O .. H U O �. R T v) a (n Y a) E a°i c to w o Z H m > m .S O 2 > o L a a Y N -O u! V p a7 _c- o d ,r'�' U d W O H m 0 Q) N L 0 a) 0 o 0 0 H LL. w a Y U O 2 CD • U O O O = N E N c LL QL +�N O) Q m N o a Ti) ci Ts J _ Q N H j U a) \) 2 co O o O > ruEN a O U E fn CO p Z Z 0 0 a a 'oA LI O a1 a) L Q ;` v O a y a 60 N o m H H O) N M Ca' F H o E _a > j m Z Z Z N a) H _ Uaa Z ;',0 .. Z , Q F 0 c m o - w C) u a ❑ z ") o Cr c 2 0a , w o r N.. • ❑ a a a) Ha C U < X U X LL O J = E c a) r Y CU E @ w U V. a �. 3, F= z Z CI - co r a rn LL N 2 E a a a .L`.. E 0 0 0 o d r c a z m U N N �y, _ o O 01 N _ v) d a) a CO N > d U W 12 Q p O. • 2 a 7 a (D N T- O -O• p) co N f� O O CO N ~O C CO a CO W 2' M m 7 r a uD � 4 O" .- N d P o G1re _ c ?, a Ya m y d 0 0 Q m m0 O > > n o -o ❑ c -o UJ UJ o Ocss >CD : H C 0 a) E E EE. 0 0 E Y J o c▪ T_ E m E E m m a o _ Nao • d 'o ° (1)i E 3 U _a c E 3 V U Q m U) a) I Ho � 4 a) I w o rn I- a } Z o Y © a) U) h- o CO N 0 O) d N o m ❑ O) a' l0 o p U y .N r H = Q a • z N a � o . z O a a In o a o LH Z N a H a) Lz a _ O Z rn U U _ o H ❑ v t d w ' co N a l< CJ •a) E v Z' 2 to a_ 2 _----+_-_ a m 3 H .-- r : V U O V 70 0) Ill a '., 0 d o a z o Q 0 N O N CO a E o2 6 y c o y 'n 2 ',� aD ❑ i0 0 = m Cl- V a N03 w v w F- O I @ w = o a w t oin Q o o) -a E o U o w H0 Q O a Z W -± LL - V OJ = 0 Q o O = U (1) 7, c Hm Lil E o_, O O a D , Q ❑ 4- Ea o � naUUYH CO a • < ❑ Lion a a o nC 0 ❑ H1Y p U 0 > z z Z z g = O CI o a W, v� C� UHLL H/; O w z o. H 0 ami Z Ud aU2 co a0 - Ha z r co `n u) 0 0 W o o '' H N = E a) w C M V L co) 2 CC U 0 w Z M 0 c LU a rt m C 0 Q 00 a w E [O• U W O (n 0 a J p 0 N J M 0O J 0 as N Ca a) J Y N Y 3 N w 3 � UayH0 03 0 QdN Ct Q 0 U Iv ❑ 0_ QJ d a � H� � Qw O N Q v d CT/ 63 mm Ua U 0 C • .- H o o a H H x H w W c E 0 c > > H co u-) a m 1E a) 'n z z w = o a i )n .O zaaa5a c o ° > o > m S - 2 2 Q - a 6 E ) a -o a a 2 0 cC D X N a v a w 0 a w w a w a E 0 m c o w o o m w a ❑ a U 0 co H F 0 O 7 m U ooH S 0 , , 75 sr a) a5 a ,a- 0 0 N N CO a r 0 8- w �`��J,+' V , O O O I Ni ai a7 Ql { O N- a7 H U ca� m .. v p Z W o /;N O_ LL CO M 0) Q X 7 O N O p N N n - CO N c .F+ N N S 0 d J m p O a) LU Cl) 41 w Q U g co D aa) 0_ Q 2 X to U co it 0 'Cr.) 61 m E r) p W_ EE N CC Y m O O U J 'S O Q d o H U. 0 ( - - L V N O WZ . w o v w °' Z H D_ Z Y @U FD u) < 2 N Q N O D' H in O 0_ CO D _ Z W c0 u- .. a 0 o 0: m Y L.. CO o o E J W U co Z E W 7 W cl Z N N Y W E) 2 2 v - 0 o m pa (7uU) UU Z j o Q o0 0_ W Z Y U CC v om f m o , 0 +r U)) CO CC Q w J d CC 2 U) UOD_ U' mH D 2 w W U Z O /) J OW � ILH W m > p 0Li_ O U p p W w Z LL 2' 2 2 X Q d H 0 J W Y W H W W D Z p Q 2 0 0- m w W o_ " co Lo / m 5 J m Q N — W QZLLm �_icci7 U OmmmomO ,- LL m gF c' _ mop Owu', HLUH - cn o0JMID-LI — un) H 0 HQNU > 0U , 0co >- OZ 0 Z O QWZw u) '5_ `—' = = W ZW Hm 00_I � 0 L Z � wOwOoY >. omauw) JOHz ") d2ZEt0_ HO ZHn � < > W 0' m w m Z 0 Q Q O Z H '3 U p LLI p C m CeZ H p H a Z g Z m Z W W p N Z W w p Q O a) a) 0 D_ OO W M Z W L_ H Q U U U 0 2 W W N E Ea YN ° z0 ° W ° gggWZUvag m — Q cam') Z p U J J N U) D_ w Q g Z D_ N p D_ N O W Y 0 m W 0_ _ 0 q U' D_ LLO fn Z 2 a) N i= ele(1) U D_ p p p � w — o a H oo Uu+ Q< N c° p � 2 _1UW D_ p � WZ 0 E c m v, — , oa8a0mmDo_ Qm9w 0 2 > o ,(21 ° 0 oowDO . O W D_ U 0 W 0 J . . . 0. . 0 W � CD CC CO - N Z 0 N O a) W Q Q • v JO m C 0 0o W = oo c c O F W O h v rn WD R Q a = 0 Q 012 2 d W 1- Z H ua mw o 0 n m Ecl I- 0 ai o EN Ey < < < U) CO 9 o 7 o 7v . >. Z an LL O -0 W 0 -p U - U OO O O O O , > N CO O N O O O X W W N N O O N O O N 00 NN N N 07 " O= M >) a) , . ca a) Z-` N E .-. 05 a) x a) X a) x a) x N 1- U .� O ❑ W 00 ❑ ❑ W 00 2 m a) 7 IC ❑ O z L:2a) 0 a '`1 N Q LL O ❑ m co O ,x, y Q. Q x N 2 .0 O O cO LO ' •,- -o c cr) K cotY c a) m D o a) TS aE E a a •a -J o a s. o U u) 0 } J o m co >- ., 0 0 V 2 O M H V N LOO C N O p .N- N N L� a) a) C 7 70 o. m a) fN0 W o,,, .Q ) V - J .- Y . a) O Z. O) O Q 2' .. , C - E O C E O > C '- 6 C a p) a) C ,_ UJ O 0 !n p 0 Cl) LL E' U) O O C d N N > N N > 5 m '5 c 0 m 3 i--,-, w v v S N N v v Q a o E o c m x x . > c a) x x > > d C) 2 a 0 > 0 ❑ W W U) a ❑ w W v) a > v +_' o' c m n a w a a a .o N 0 CO a) C, c0 LL LL Q p EEN "' o a <C Q1 o E -- 'o_ Q .0 U N a :a2 a a) -= m = CG I 1 `- Y ©a 0 0 Z0 Et 0 0 CD Q N m n 1 n d Q ..- N Z a a) LPN o J .o )n o a7 OO N N O U N O d o Z 3 a) 0 O O O O Z a) N (6a) p) 0 U` O O) m To E a E c d ❑ Z N a) r > 0 cn o o a) o. = E C = E o _Ec HT > a) O N O HZ N N (6 c 2N a) a) C iQ Z Y fn U- w CO ❑ Q ;;;;;;:24 00 Z _ Q 0 W CD O 0 Z - 0 esi Z W = -- 8-) Z Q U o Y o 0 W ❑ -Y2 ,- 2 O W } V 7 _ Z 0 w Z 0 W U -o W 0 O W 2 0 0 o m � m Z Ct w w < 0 w E ^ 0 0 •N V) _ a .�.. F U CO tD F 0 0. r N CO a) N , m Z tY O E 03 W s` ILI Z N ns E m O W 0 s .. Y6 a) W W u) Z o CC Et 0. c c E C) U a) C H a) a < N ' E ` a) a) p) m o Cd 0. O O U a a) Z (a E a) a) 3 a) a) a) a) p a) a T O > d V) a)o o_ V) d N a) U) a) E O F ` ' o. C C O 51 ,- Z I- N 7 > T 0 Z H y > T 0 ,C E a) •C C .. - a) a) O_ `, p N H ` p N H L- )f) 0 N. N- o 2 > O .o C E a) f6 'V - . -o Y a)` -o N L d -o CC a) -p N V a7 O N N- 0 d c� o 11.' 00 ' Lj v a n a CO O c7 it in a r in o c� 0 0 CO o a • 0 NU O 8'113 iii CL N O F y E Q) C l Q L O) Q m co a , ra 4 F a a = m m a a) aJ U -NO > (t > a CU N E 0 N N. Z Z 0 0 C7 m CC 31 m o ^L a) a v o Uav y� o a o I- Na C7 N Cl) M a) H I- O )^j > > Q � a ._ t, U. H In CM O a) • N F U a d Z O o of Z m a H C c0 O -, d N O II Z N 4 C a w O C J o a r m CL U) Q X cn E u) / O 9 -- a O E a) E ca N a °), E ao z Z C r Tr o 'a m a a E N a_ a' 3 a a 7 O p o Y "Oo Z cq N N LL = a C O _� A O Ii oo a c w a = o C m .p Y6 • a) - a a s Y 61) m > le > o o % g Q a) 2 m t i .�3. O Y "_ s . -o -o • C o rn m m m .. ° = a N E 3) a v ~ a z 1= U o f m v E CD W `� 12 -2-. } E x a) ° U El zi E E Q �.! N m a �_ m fn Ct C N L d N O (6 U) O O O D N O O V ce — ° o } m ~ ° m Z , YUP Ha o mLCN y C-Ii a N a Z N ^ m w U as o O 0 u) '., H Z ai CD—. m -0 .- (q w a- m ^ 0 ° E -o 2 ° Z . a Z > a Cl-) CoL O) ` F° N nnaQ° 6 c z2 m a v m = t a Lu g c co a J a E a °) O E V Q O E F = m m m 1,- Xa 70 0 .. C y O T 2 F-- 00 a 0 N v I- O x w o c o i N u' > w ct E Q p w S) N 2 Z J w Q E N C^ o E � o tO _ O 7 ^ a1 r0 7 Z O > a a O ca ^ cA O U U > Z a z Z 2 O o O c W O • so,0O w Z 0. ami o E m m "O' co 0 J H Z is O 0 N w C V CO L CA 00 r.. Z co O1co 2 -O ✓T N a Z a O w a U a) o N a7 Q O (n 0 0) J v 3 1 r Z 0 a' a' N ce a T, Co ) '6 d N 2 . a N o • d Q N a j 7 co Z' - T 0 Y a a) E N m LO a co c a- d 3 Q w O`_ c o ° > o 0-) o a d a) a o ° a a c) a w c> > E m m c o w o I-• I= U 0 > CO 0 CO I- x N 6 I a) a) I _ _ O N O O C O O O co c[ h O "Fn O f6 W n n 2 aD U- m U Ia °' m c d O O O X X O m CO CO N W N E .. E Q Q (p ❑ v) CO O w > O uo o O 7 • § a) -0 W O .0 w 0 O O O O OO U -O v If, O O O O V� ^ e- m 2 N N > N y > N D N O O _ O O O N OO O N N N @ m 2 2 aN) co p O YO jN O _` a) 4> N a) z` N N O W .«� C C N C x c• 0 N V C a) x N x a) x N x c� E U o ❑ 0 W o ❑ 0 W o I Z' a) O co C m o —, u t z L a) o 42 a OQ w p E O N 0_ LL ,••••, O O '1i O_' U) Q X N CC o O _ O O -O N a) — O } O o a 2 'a c U) cC C o _1 E o d a aa u) o aa U U) ❑ -- o } -J o " - Y 0 o V 2 O co IQ- OM t- N xr O NN Q W NE p a) a) m I N <- 2 E E CZCO a) a) a1 N N N - Z` N o 2` a) o Y V ❑ O J CL' C O E o C '5 g O CO d w Et a o o N m o n N N > o Q W .N N y C N V a) a) N U N a) J 0 3 w o o CC o o w Q o o E o o a x x > p a) x x 3 > a) o CU > C • • ❑ W W (A a V ❑ W w U) a > C = • v a n CO r 2° 2 -aa a a m rn N 41 m a) a- m 3 ao E E I = d °) a ❑ W a EQ d ' N 7o N Na Q L V N O d ^ o tr m ct M o &--- -t v rn a z Y ©, 0 0 C' Et co m a1O d CI) dcsi dN N -0 /(` a Q O. . Zna O J .o co .O N O O ) O 0 a Z oc � (0 o 0 u0 o Z ai - a) mCo 0 m m o0 o C7 o CE a E c d 0 m a) a) ` Z > 0 Cr) N W 0) U (TU) tY < O .) O a)i .6 > cii N n E C _C d' E C o F- QO JO O LT LL W co m Q_' d Q Z J Q W Q ❑ tL C7 ce w Z Z Y M C7 Z Q CC m ^ _ 2 w O O po Y O N V Z OU U w' Y rn O 2 00 0 ❑ ❑ d w W a Z rCU 6 U U U oO W Z = ❑ dd o m O 0 cC LU w o w E — t` O N i U) d 'i_ U) U) O U d p E N Z U) ❑ Z' c a) W 2 z co E m oa 2 LL) O E w - Z N o a w xi- 'z L U o Q 6-- t6 Z. E rn V m '6 N E ,_ a) a) co a) a) C a- a 0 p 0 a) F- .= a) a) E a) N a) N E .. N 'O 0. E T H m u, a C C o m o a) FT C) - > T o m I- ai D o Cl) U) 0 c o2 j g a .0 a) E a) 3 .V V. . d D Y a`) Hi= W :a �' O_ 'O .• a) H a) v CCO CCO o a v a w 0 ' v v a 1 . 2 a > U) O 2 C7 . ( a y to O 2 c� x 0 0 0 0 N O L N j 3 a) COa N N N O = E a) c C W Q L E) C7) ` Q m Na a)cr) LL a s a J ^ g dO E E N OD ° E U H F 2 m P. a) U r co a`0) o) U U) CCO ❑ - Z Z cl L_ n o o. co a N .0 L N a) ELL Ua -- a _ o I v o U U ° N F°- 0 0 n) N0 N El M 12O � FCO ti) - co E N a) O LO _ a) > z r O O N E a F- C LL V! 01 L d a.. M E U O c (N E U c H c a) 0 2 [ a ❑ z Un o c Q W O -c J a) a. LL A I0 ct Q x U) -.E o a E a) 'li LL a o a) a) °. U O. al U) . a 2 p _ E N co n a ° Z z C E ✓ N a a) . a a ^ E '.. o o L y m r a s a d Z N o E rn e, 'n a aa N ,- o a) y d n w U aU7 o a. CO E - 42 a u a) > - 41 0 x as a m 5 a F°°- - N Q. C °� m L d U) E .. ) C O . U) o_o) 5 a. a .. N O a N U W Q a H o d E E m E } d ~ o` ° °' N y U F- y a L > a) O a) C1 2 m in y ° w w O > a ❑ v F y a 3 U f+ o a �° E c E c o a° E y C .- •;7: C m oo N o °' } a 0 LL z F U o E .� C U U E w • o o a x ~ ca - m N a) O m 3 N C ° CD 1 N o .° ) a m E 3 0 c E 3 r U - N O d" U a) o p ° ❑ o ° p m LL o , Y U 2 F- t 2' 2 Z o Y cT_ a) N '' d N O 2 F Z a N v u) W U N 'N �- a z E o 0 0 a n w a m m • E "� F a a L a o a (i «. z > a C l9 O) O L (n (n a' a ov a) E E, ? v) N C N -0 LL' O) j F- L .a) o E v) o U M J a) o LL U E o a •C O .. ) E F- S m m° m v x0 .0 .a .. C i 00 o m F- o a) d O 47) O L v LL F° 0 2 m 3 E LL a) C a a°3 v ° � � E LL rn in Q D a Z rn L1.1 v LL o_ o - a) C co a) O E a 5 O r E N o 3 o = — 7 N 0 O 0 a) o > LL o v > a S 0 LL N o C C T Z Z Z 0 W Z a) v al ''CO O J O F- Z CC O O O 0 N I ET O O W 9 V M L co Z UI ❑ - d O a) -o N U) m u'1 m mO W L °1 an U a)23. Lu U a) J N au d) 'L6 U d N co < 2 a N o • LL a o oN E R 2 N Z• Z aTi Y a E• U N N Y _c O C C C 3 d d O C U a W U ❑ ~ U C E m o W o N N F- R 0 U Z CO U CO F- 1 • m v m COD O F. o r co z : v1 CU N Z j Z j r V G7 N E C N D. ri, d . tp V t0 D W D fV+ �D `Jrt a n co 70 m o0 7DC A. m CO ID o ro 00 ro a CO rr ,-P to to N (11 N N N = cu O O O O O O• o N Al N N N N 8 3 (0 cp t0 CD CD to > v co W 43 -0- W0 ' V SZ 0) (Tv to to U1 - . 3D Y' O N co j 0 .1%= O N A 0 -4 to V O o o o o o m =p7 O 0 0 O o v :_ v C x v C o � .rte° m 0 0 C) C) C) C) 7 x 3 coo < rn CO uCO x) a) <_ y CU 0 Do = N 0 = n ,,, Ui _ Xx m Tom: &m i> o 0 0 0 0 0 O O O o 00 O O G OCC '''t., v• vi V) X X r✓s 0-7 � + 17 -0 -0 -0 - r C r C C C m ro y 0y 0001- a t a = 2 = C3 c O c O O O z 3 m ; m m m a > : > > M m C*.:,,. r r 0 r 0 0 7 .. ._ w i. i. ® ((ID go R 0 .O QV CC ." 0 M iiiC V6 02 Cot ed m •-• C) 00 CD AO CSD a W co 13+ r n r 0 m 0 03 03 t: f ID n D a IV ` OvD ro = 74 xi O 0 v nCT). -m Cr -0 v,0 D z n 0 n S m � m O (D n rp S n '71 T T T T T 1 0 C9 o — v a > > > > > > a c = r, CD o r r r r r r D 0 L„ rD u m m T T M m -I 0 0 Co mmmmmm � r r r r r r m -o m—= n .- 000000 c d — rD CU :11• a a) co ro 'I D o v D z (IT D to °' C s D Z v' Q ", W CD O) N t V7 CD• -C3 Co 0 3 Om Dininm r- 5 0 3 , w tD C cD (D o_ m , a CO a v v O -1 A Gl ✓ S N n 3 0 - .1 C) D O N N N N m D -0 t(1) o a v 0 m v n a o 70 O o OD (D (D co z , N 0 -* -0 o o co 1X H.4 o , �a < n x zN0O a CT 0 nCrq ;.:0 mm�m * 0 04 ro Oo ....1 V r 214127 lraaa BAKER PRINT DISTRIBUTION LIST 2 5 2 HUGHES 8 8 COMPANY BP Exploration Alaska Inc INTERMEDIATE FINAL Yes (mandatory) DATA LOGGED WELL NAME N-28 RUN NUMBER /22/2015 (mandatory) M.K.BENDER FIELD Prudhoe Bay BH SALESMAN PAUL CANIZARES (mandatory) (mandatory) COUNTY North Slope Borough BH DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: November,2014 TODAYS DATE: 19-Jan (mandatory) DISTRIBUTION LIST AUTHORIZED BY: PAUL CANIZARES (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? No COMPANY FIELD FINAL (digitalCD ADDRESS(FEDEX WILL NOT DELIVER TO P.O.Box) LOGS LOGS image) FILM PERSON ATTENTION #OF PRINTS #OF l'KIN I S #OF COPIES #OF COPIES 1 State of Alaska -AOGCC �Attn:Makana Bender [333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 2 . PDF 1115/2015 2:33 PM File folder Survey Data 1/'16/2015 2:32 PM File folder U N-28_BHI_LTK_Mem_Composite_FE Drilli... 11/11/20141:20 PM DIS File 19,943 KB 28_BHI_LTK_Mern_Corr�p4site_FE Drilli... 11,11,x28141:15 PM LAS File 45,029 KB 3 4 JAN 21 2015 AOGCC 5 6 TOTALS FOR THIS PAGE: 0 1 1 0 0 0 21 4127 '/M 26289 BAKER PRINT DISTRIBUTION LIST HUGHES Please sign and return one copy of this transmittal form to: COMPANY BP Exploration Alaska Inc BP Exploration(Alaska)Inc. (mandatory) Petrotechnical Data Center, LR2-1 DATA LOGGED /y0/201S WELL NAME N-28 900 E. Benson Blvd. M.K.BENDER (mandatory) Anchorage,Alaska 99508 FIELD Prudhoe Bay Unit to acknowledge receipt of this data. (mandatory) COUNTY North Slope Borough LOG TYPE RPM-Wireline (mandatory) (mandatory) STATE Alaska BH DISTRICT Alaska (mandatory) (mandatory) LOG DATE: September 17,2015 TODAYS DATE: 27-Sep-15 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: CANIZARES EMAIL: (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? No COMPANY A B C D ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) L.I.S. FILM PERSON ATTENTION #OF PRINTS #OF I'KIN 1 S #OF COPIES#OF COPIES#OF COPIES#OF COPIES 1 ConocoPhillips Alaska Inc. 1 1 1 1 Attn:Ricky Elgaricio A= N-28_MRPM_PNC3D_RAW_17SEP2015_BHI.meta ATO 3-344 700 G Street B= *(Folder 1 on cd/dvd) N-28_MRPM PNC30 RAW_I7SEP2015_BHl.mets Anchorage,AK 99510 C= **(Folder 2 on cd/dvd) N-28_MRPM_PNC30_RAW_I7SEP2015 BHI.PIf D= ***(Folder 3 on cd/dvd) N-28_MRPM_PNC30_RAW_PASSOIUP 17SEP20I5_BHl.dlis N-28 MRPM PNC30 RAW PASS02UP I7SEP2015 BHI.dIis N-28 MRPM CCL RAW PASS02UP I7SEP2015 BHI.dlis ****(Folder 4 on cd/dvd'N-28 MRPM PNC30 RAW PASSIIUP_l7SEP2015_BHl.las N-28 MRPM PNC30 RAW PASS02UP I7SEP2015 8Hl.ias 1-28 MRPM CIL RAW PASS02UP 173EP2015_BH1.1as * Folder 1 on cd/dvd needs to be named "META" ** Folder 2 on cd/dvd needs to be named "PDF" *** Folder 3 on cd/dvd needs to be named "DLIS" **** Folder 4 on cd/dvd needs to be named "LAS" 2 ExxonMobil,Alaska 1 1 1 1 I Attn:Lynda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr.Suite 600 Anchorage,AK 99503 3 'State of Alaska-AOGCC 1 I 1 1 Attn:Makana Bender jgi,VED W.7th Ave,Suite 100 c D Anchorage,Alaska 99501 SEN d9�g U 4 DNR-Division of Oil&Gas 0 I 0 1 Attn:Sean Clifton Nse 550 West 7th Avenue,Suite 802 Anchorage,Alaska 99501 5 I I I I 1 TOTALS FOR THIS PAGE: 3 3 4 4 0 0 TOTALS FOR ALL PAGES: 3 3 4 4 0 0 • • Loepp, Victoria T (DOA) From: Loepp,Victoria T (DOA) Sent: Friday, October 24, 2014 2:27 PM To: 'Endacott, Mary S' Cc: Davies, Stephen F (DOA); Rosenbaum,Jesse E (Jesse.Rosenbaum@bp.com); Regg,James B (DOA); Staudinger, Garret (Garret.Staudinger@bp.com);AK, D&C Rig 272 Well Site Leader(AKDCRig272WellSiteLeader@bp.com); Sarber, Greg J; Smith,James Subject: RE: N-28i PTD#214127 - Diverter Waiver Request Follow Up Flag: Follow up Flag Status: Flagged Mary, The diverter waiver request is not denied. We are not going to consider it now and allocate the time to review when an approved diverter plan is in place and the spud date is imminent. We will consider future diverter waiver requests given more lead time and would recommend these requests be a part of the PTD application. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave,Ste 100 Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loepcoa.alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Ferguson at(907)793-1247 or Victoria.Ferguson@alaska.gov From: Endacott, Mary S [mailto:Mary.Endacott@bp.com] Sent: Thursday, October 23, 2014 5:01 PM To: Loepp, Victoria T(DOA); Rosenbaum, Jesse E Cc: Davies, Stephen F(DOA); Regg, James B (DOA); Staudinger, Garret; Sarber, Greg J; AK, D&C Rig 272 Well Site Leader; Smith, James Subject: RE: N-28i PTD#214127 - Diverter Waiver Request Just to be clear, application for waiver is denied? Sent from my Android phone using TouchDown (www.nitrodesk.coi ) Original Message From: Rosenbaum,Jesse E [Jesse.Rosenbaum@bp.com] 1 • • Received:Thursday, 23 Oct 2014, 2:58PM To: Loepp,Victoria T(DOA) [victoria.loepp@alaska.gov] CC: Davies,Stephen F (DOA) [steve.davies@alaska.gov]; Regg,James B (DOA) [jim.regg@alaska.gov]; Staudinger, Garret [Garret.Staudinger@bp.com]; Endacott, Mary S [Mary.Endacott@bp.com]; Sarber, Greg J [SarberJG@BP.com];AK, D&C Rig 272 Well Site Leader [AKDCRig272WellSiteLeader@bp.com]; Smith,James [James.Smith7@bp.com] Subject: RE: N-28i PTD#214127- Diverter Waiver Request Hello Victoria, Thank you for considering a diverter waiver. We will continue with the approved PTD diverter layout as originally planned. Thank You, Jesse Rosenbaum Drilling Engineer I BP Exploration Alaska 0:907-564-5155 I C:406.533.8984 jesse.rosenbaumnbp.com From: Loepp, Victoria T(DOA) [mailto:victoria.loepq@alaska.gov] Sent: Thursday, October 23, 2014 2:52 PM To: Rosenbaum, Jesse E Cc: Davies, Stephen F (DOA); Regg, James B (DOA) Subject: RE: N-28i PTD#214127 - Diverter Waiver Request Jesse, The diverter route approved in the PTD meets regulations. Please plan on using the diverter as outlined in the approved PTD. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave,Ste 100 Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loepp(a alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Ferguson at(907)793-1247 or Victoria.Ferauson@alaska.gov From: Rosenbaum, Jesse E [mailto:Jesse.RosenbaumObp.com] Sent: Thursday, October 09, 2014 5:15 PM To: Davies, Stephen F (DOA) Cc: Loepp, Victoria T(DOA) Subject: RE: N-28i PTD#214127 - Diverter Waiver Request 2 • • Hello Steve, My apologies. I discussed the possibility of getting that data from the rig team and Parker Drilling, but TOTCO system on Parker 272 is not currently equipped with the flow-line gas reading. The measurement is only taken real-time from the gas sensor and is not recorded in the rig data. We are currently working with TOTCO to install the flow-line gas reading and record the data in the TOTCO system but is not currently in place I was under the impression that Parker 272 had the same setup as Doyon 25 which has the capability to record those readings and monitor through TOTCO. Please let me know if there is anything else I can provide. Thanks, Jesse Rosenbaum From: Davies, Stephen F (DOA) [mailto:steve.davies@lalaska.gov] Sent: Thursday, October 09, 2014 4:39 PM To: Rosenbaum, Jesse E Cc: Loepp, Victoria T(DOA) Subject: RE: N-28i PTD#214127 - Diverter Waiver Request Jesse, That's fine,as long as I know what the LEL value is. Is this data stream something I could reduce? Since I asked for it, I'll be glad to do the work. Thanks, Steve Davies CONFIDENTIALITY NOTICE: This e-mail message, including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov. From: Rosenbaum, Jesse E [mailto:Je ,e.Rosenbaum(abp.com] Sent: Thursday, October 09, 2014 4:37 PM To: Davies, Stephen F (DOA) Cc: Loepp, Victoria T(DOA) Subject: RE: N-28i PTD#214127 - Diverter Waiver Request Hello Steve, Just to clarify,that data would be in gas units as a function of the LEL limit and is expressed as a percentage. Thanks, 3 • • Jesse Rosenbaum From: Davies, Stephen F (DOA) [mailto:steve.davies@alaska.gov] Sent: Thursday, October 09, 2014 2:41 PM To: Rosenbaum, Jesse E Cc: Loepp, Victoria T(DOA) Subject: FW: N-28i PTD#214127 - Diverter Waiver Request Jesse, In addition to my questions, below,when does BP plan to spud N-28? Thank you, Steve Davies Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission (AOGCC) Phone: 907-793-1224 AOGCC: 907-279-1433 Fax: 907-276-7542 333 West 7th Avenue,Suite 100 Anchorage,AK 99501 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov. From: Davies, Stephen F (DOA) Sent: Thursday, October 09, 2014 11:33 AM To: 'Jesse.Rosenbaum@bp.com' Cc: Loepp, Victoria T(DOA) Subject: FW: N-28i PTD#214127 - Diverter Waiver Request Jesse, Were mud-gas measurements versus depth recorded while drilling in N-29, N-30 or any other nearby, recently drilled wells at N-Pad? If so, could you please provide them? Thank you, Steve Davies Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission (AOGCC) Phone: 907-793-1224 AOGCC: 907-279-1433 Fax: 907-276-7542 333 West 7th Avenue,Suite 100 Anchorage,AK 99501 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov. 4 • • From: Loepp, Victoria T(DOA) Sent: Thursday, October 09, 2014 10:59 AM To: Davies, Stephen F (DOA) Subject: FW: N-28i PTD#214127 - Diverter Waiver Request For your review- From: Rosenbaum, Jesse E [mailto:Jesse.RosenbaumObp.com] Sent: Thursday, October 09, 2014 10:48 AM To: Loepp, Victoria T(DOA) Cc: Staudinger, Garret; Endacott, Mary S Subject: N-28i PTD#214127 - Diverter Waiver Request Good Morning Victoria, In light of 2 grassroots surface holes drilled on N-pad on the last 2 months(N-29i and N-30), BP would like to request a diverter waiver for the next surface hole to be drilled on N-pad. Please see the reference information below. N-Pad History N-Pad is located in the north-central portion of the Prudhoe Bay Field BP has done extensive Pore Pressure/Fracture Gradient studies throughout Prudhoe Bay. A study on N-Pad has been conducted (updated October 24, 2012.) Here is some N-pad history and key findings from this study: • Influx Events: "There have been no documented influx events at N-Pad." • Breathing: "There have been no documented breathing events at N-pad." • Mud Logs/ Connection Gas / Gas Cut Mud: Mud logging was not a common practice during the development of Prudhoe and most of the mud logs we have are paper copies from the late 1970's/ early 1980's. The mud log from N-01 is from 1970 and does not contain connection gas data. Background gas is the only well documented data from the N-01 mud log. N-01 is the only instance of gas cut mud on N-pad, drilled in 1970, and shows gas cut mud at 4320' TVDss and 6381' TVDss. These are in the Ugnu and Colville, respectively, and lie below the planned surface interval for N- 28i. • Shallow Gas:There have been no documented shallow gas events on N-pad • Shallow water flows:There have been no documented shallow water flows on N-pad • Disposal: Disposal near N-pad is below the surface casing interval. The GC-2E disposal well injects into the UG3 and is 4200' away from the N-28i target well path at the injection horizon depth. Injection into GC-2E was relatively constant and modest from 2011 to 2013. In the past 6 months, disposal has been minimal. GC-2C has not been active since 2007. ML pressure for UG3 was set at 9.3ppg and the max PP from the pad PPFG validation report is 9.5ppg. • The most two recent wells drilled on N-Pad: o N-29i was drilled in September this year(2014) with no shallow hazards encountered, gas or hydrate related. o N-30 was drilled in October this year(2014) with no shallow hazards, gas, or hydrate related issues. o N-27i was drilled in September 2007 with no shallow hazards encountered, gas or hydrate related. A review of wells that have been drilled within 500'of the proposed surface casing shoe depths has been performed: 5 • • • N-28i 500' Radius at Surface Casing Point 0 • I r I I I e , I L N-24 was a grassroots producer drilled by Nabors 28E in June of 1992.The drilled a 13"surface hole to 3210' MD (3001' TVD) with no issues. Had to work through a bridge at 2100' MD but able to work through. 10-3/4" casing was run to TD. Surface casing was cemented with 356 bbls of 12.1 ppg arctic-set lead cement and 71 bbls of 15.8 ppg class G bbls of cement and did not achieve cement to surface.A top job was performed and 20 bbls of arctic set cement was pumped to achieve cement to surface. No signs of shallow hydrocarbons,free gas, hydrates or shallow water aquifers. 6 , . . • • Alaska Region _ .. by PPFG Prediction Status 4irltuns ta. 2012 .,, 4 N-Pad \''''.--,,-7— , , _ _ i ki(l..) U . el r- likr, ,. _.‹.,.-.-6-L7 _ 40 e -.'�"w r``y 7 . ,,'' ''' ' *.?.._ 4 ka .•,,,,', - fi . .. - , . . - % ., „.. .. . kt ., \ . . , . ,, , iS k ti r3 a •t . " I t`'. ,,Ak, ,fes :y„' ' 11 • t ,s.� , .� , .ter Y M ,, x, '0.- a. 4 4,4 At ` li x N-28i Please let us know if you or your colleagues need additional information. Thanks, Jesse Rosenbaum Drilling Engineer I BP Exploration Alaska 0:907-564-5155 I C:406.533.8984 jesse.rosenbaum( bp.com 8 P Tp Zl 4- / z�— Loepp, Victoria T (DOA) From: Rosenbaum,Jesse E <Jesse.Rosenbaum@bp.com> Sent: Thursday, October 23, 2014 2:58 PM To: Loepp,Victoria T(DOA) Cc: Davies, Stephen F (DOA); Regg, James B (DOA); Staudinger, Garret; Endacott, Mary S; Sarber, Greg J;AK, D&C Rig 272 Well Site Leader; Smith,James Subject: RE: N-28i PTD#214127 - Diverter Waiver Request Hello Victoria, Thank you for considering a diverter waiver. We will continue with the approved PTD diverter layout as originally planned. Thank You, Jesse Rosenbaum Drilling Engineer I BP Exploration Alaska 0:907-564-5155 I C:406.533.8984 jesse.rosenba ume.bp.com From: Loepp, Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent:Thursday, October 23, 2014 2:52 PM To: Rosenbaum, Jesse E Cc: Davies, Stephen F(DOA); Regg, James B (DOA) Subject: RE: N-28i PTD#214127 - Diverter Waiver Request Jesse, The diverter route approved in the PTD meets regulations. Please plan on using the diverter as outlined in the approved PTD. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave,Ste 100 Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loepp(a alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Ferguson at(907)793-1247 or Victoria.Ferguson@alaska.gov 1 - Z� PTD 214-- 1 Z� s Loepp, Victoria T (DOA) From: Rosenbaum,Jesse E <Jesse.Rosenbaum@bp.com> Sent: Thursday, October 09, 2014 5:15 PM To: Davies, Stephen F (DOA) Cc: Loepp,Victoria T (DOA) Subject: RE: N-28i PTD#214127 - Diverter Waiver Request Hello Steve, My apologies. I discussed the possibility of getting that data from the rig team and Parker Drilling, but TOTCO system on Parker 272 is not currently equipped with the flow-line gas reading. The measurement is only taken real-time from the gas sensor and is not recorded in the rig data. We are currently working with TOTCO to install the flow-line gas reading and record the data in the TOTCO system but is not currently in place I was under the impression that Parker 272 had the same setup as Doyon 25 which has the capability to record those readings and monitor through TOTCO. Please let me know if there is anything else I can provide. Thanks, Jesse Rosenbaum From: Davies, Stephen F (DOA) [mailto:steve.davies@alaska.gov] Sent: Thursday, October 09, 2014 4:39 PM To: Rosenbaum, Jesse E Cc: Loepp, Victoria T(DOA) Subject: RE: N-28i PTD#214127 - Diverter Waiver Request Jesse, That's fine, as long as I know what the LEL value is. Is this data stream something I could reduce? Since I asked for it, I'll be glad to do the work. Thanks, Steve Davies CONFIDENTIALITY NOTICE: This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov. From: Rosenbaum, Jesse E [nailto:Jesse.Rosenbaum@bo.com] Sent: Thursday, October 09, 2014 4:37 PM 1 . To: Davies, Stephen F (DOA) • • Cc: Loepp, Victoria T(DOA) Subject: RE: N-28i PTD#214127 - Diverter Waiver Request Hello Steve, Just to clarify,that data would be in gas units as a function of the LEL limit and is expressed as a percentage. Thanks, Jesse Rosenbaum From: Davies, Stephen F (DOA) [mailto:steve.davies@alaska.gov] Sent: Thursday, October 09, 2014 2:41 PM To: Rosenbaum, Jesse E Cc: Loepp, Victoria T(DOA) Subject: FW: N-28i PTD#214127 - Diverter Waiver Request Jesse, In addition to my questions, below, when does BP plan to spud N-28? Thank you, Steve Davies Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission (AOGCC) Phone: 907-793-1224 AOGCC: 907-279-1433 Fax: 907-276-7542 333 West 7th Avenue,Suite 100 Anchorage,AK 99501 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Steve Davies at 907-793-1224 or steve.daviesPalaska.gov. From: Davies, Stephen F (DOA) Sent: Thursday, October 09, 2014 11:33 AM To: 'Jesse.Rosenbaum@bp.com' Cc: Loepp, Victoria T(DOA) Subject: FW: N-28i PTD#214127 - Diverter Waiver Request Jesse, Were mud-gas measurements versus depth recorded while drilling in N-29, N-30 or any other nearby, recently drilled wells at N-Pad? If so,could you please provide them? Thank you, Steve Davies Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission (AOGCC) Phone: 907-793-1224 AOGCC: 907-279-1433 2 Fax: 907-276-7542 • • 333 West 7th Avenue,Suite 100 Anchorage,AK 99501 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it, and,so that the AOGCC is aware of the mistake in sending it to you,contact Steve Davies at 907-793-1224 or steve.davies@ialaska.gov. From: Loepp, Victoria T(DOA) Sent: Thursday, October 09, 2014 10:59 AM To: Davies, Stephen F (DOA) Subject: FW: N-28i PTD#214127 - Diverter Waiver Request For your review- From: Rosenbaum, Jesse E [mailto:J. se.Rosenbaum@bp.com] Sent: Thursday, October 09, 2014 10:48 AM To: Loepp, Victoria T(DOA) Cc: Staudinger, Garret; Endacott, Mary S Subject: N-28i PTD#214127 - Diverter Waiver Request Good Morning Victoria, In light of 2 grassroots surface holes drilled on N-pad on the last 2 months (N-29i and N-30), BP would like to request a diverter waiver for the next surface hole to be drilled on N-pad. Please see the reference information below. N-Pad History N-Pad is located in the north-central portion of the Prudhoe Bay Field BP has done extensive Pore Pressure/Fracture Gradient studies throughout Prudhoe Bay. A study on N-Pad has been conducted (updated October 24, 2012.) Here is some N-pad history and key findings from this study: • Influx Events: "There have been no documented influx events at N-Pad." • Breathing: "There have been no documented breathing events at N-pad." • Mud Logs/ Connection Gas / Gas Cut Mud: Mud logging was not a common practice during the development of Prudhoe and most of the mud logs we have are paper copies from the late 1970's/ early 1980's. The mud log from N-01 is from 1970 and does not contain connection gas data. Background gas is the only well documented data from the N-01 mud log. N-01 is the only instance of gas cut mud on N-pad, drilled in 1970, and shows gas cut mud at 4320' TVDss and 6381' TVDss. These are in the Ugnu and Colville, respectively, and lie below the planned surface interval for N- 28i. • Shallow Gas:There have been no documented shallow gas events on N-pad • Shallow water flows:There have been no documented shallow water flows on N-pad • Disposal: Disposal near N-pad is below the surface casing interval. The GC-2E disposal well injects into the UG3 and is 4200' away from the N-28i target well path at the injection horizon depth. Injection into GC-2E was relatively constant and modest from 2011 to 2013. In the past 6 months, disposal has been minimal. GC-2C has not been active since 2007. ML pressure for UG3 was set at 9.3ppg and the max PP from the pad PPFG validation report is 9.5ppg. • The most two recent wells drilled on N-Pad: 3 o N-29i was•ed in September this year(2014) with no shallow hazards encountered, gas or hydrate related. o N-30 was drilled in October this year(2014) with no shallow hazards, gas, or hydrate related issues. o N-27i was drilled in September 2007 with no shallow hazards encountered, gas or hydrate related. A review of wells that have been drilled within 500'of the proposed surface casing shoe depths has been performed: N-28i 500' Radius at Surface Casing Point I 500 0 N-24 was a grassroots producer drilled by Nabors 28E in June of 1992.The drilled a 13" surface hole to 3210' MD (3001' TVD)with no issues. Had to work through a bridge at 2100' MD but able to work through. 10-3/4" casing was run to TD. Surface casing was cemented with 356 bbls of 12.1 ppg arctic-set lead cement and 71 bbls of 15.8 ppg class G bbls of cement and did not achieve cement to surface.A top job was performed and 20 bbls of arctic set cement was pumped to achieve cement to surface.No signs of shallow hydrocarbons,free gas,hydrates or shallow water aquifers. 4 , • • [ _ ..._____ --_ iiv_ --_ . i------: 0 bp Alaska Rion Prediction Status fatJune 14, 2012 — N-Pad ....... ..._ _ t ... r a . -, i . 'P . ' , , • ' ' 111) k.,-.: - ' -`",i new 1." 411 1 I 0,,„„ % • 1 , ,, , • . , t 5 . 1 , . • ,' \ 0 N-PAD R, `fir , pril oppor li it ti iikii • ; t `F. r WA' 5 N-281 w. '40041944-. 8 Please let us know if you or your colleagues need additional information. Thanks, Jesse Rosenbaum Drilling Engineer I BP Exploration Alaska 0:907-564-5155 I C:406.533.8984 jesse.rosenbaum(ilbp.com 6 • • • Pi-J 214-12� Ferguson, Victoria L (DOA) From: Rosenbaum,Jesse E <Jesse.Rosenbaum@bp.com> Sent: Thursday, September 04, 2014 1:50 PM To: Ferguson, Victoria L(DOA) Cc: Lastufka, Joseph N; Green, Darrell;AK, D&C Rig 272 Well Site Leader;AK, D&C Rig 272 Tool Pusher Subject: RE: PBU N-28(PTD 214-127) Diverter Line Route Follow Up Flag: Follow up Flag Status: Completed Victoria, Thank you for the clarification I will verify that is a targeted 22°with our operations team. Thank You, Jesse Rosenbaum From: Ferguson, Victoria L (DOA) [ 'a:victoria.ferguson@alaska.gov] Sent: Thursday, September 04, 2014 1:20 PM To: Rosenbaum, Jesse E Cc: Lastufka, Joseph N Subject: RE: PBU N-28(PTD 214-127) Diverter Line Route Jesse, Just to clarify,this bend must be targeted. Please insure this is included in the approved PTD. Thanx, Victoria Victoria Ferguson Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave,Ste 100 Anchorage,AK 99501 Work: (907)793-1247 victoria.ferquson(a)alaska.aov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Ferguson at(907)793-1247 or Victoria.Ferguson@alaska.gov From: Ferguson, Victoria L(DOA) Sent: Friday, August 29, 2014 1:55 PM To: 'Rosenbaum, Jesse E' 1 • • Cc: Lastufka, Joseph N (Joseph.Lastufka0bp.com) Subject: RE: PBU N-28(PTD 214-127) Diverter Line Route Jesse, This looks much better- Thanx, Victoria Victoria Ferguson Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave,Ste 100 Anchorage,AK 99501 Work: (907)793-1247 victoria.ferguson@alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Ferguson at(907)793-1247 or Victoria.Ferguson@alaska.gov From: Rosenbaum, Jesse E [mailto:Jesse.Rosenbaum@aIbp.com] Sent: Friday, August 29, 2014 7:32 AM To: Ferguson, Victoria L(DOA) Cc: Lastufka, Joseph N Subject: RE: PBU N-28(PTD 214-127) Diverter Line Route Good Morning Victoria, I have been in contact with operations and the superintendent has optimized the diverter layout after some analysis. This is layout I received yesterday.. Thank You, Jesse Rosenbaum urriir;g tr,gir,eer j BP Exploration Alaska 0:907-564-5155 C:406.533.8984 jesse.rosenbauml bp.com From: Ferguson, Victoria L(DOA) [mailto:victoria.ferguson@ialaska.gov] Sent: Thursday, August 28, 2014 11:20 AM To: Rosenbaum, Jesse E Subject: PBU N-28(PTD 214-127) Diverter Line Route Jesse, 2 • Please provide a close-up figure for the Parker 272 diverter line route. Thanx, Victoria Victoria Ferguson Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave,Ste 100 Anchorage,AK 99501 Work: (907)793-1247 victoria.ferauson(ialaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Ferguson at(907)793-1247 or Victoria.Ferguson@alaska.gov 3 • - 0, — r• — — a — — — , 29- ii 1 ,.... .,_ ........_ _ _ _ ......... 27 $ 1 ,c:- 'Nr.---) 1/4-) ) 26 1 : , ; – ' 30 '1 'I \21:\e; 1:11.---ec I —' II 2311 1 i, v I , tin I 11 11 ,-- ' I; I 1 '., A 1 0 ,.. C...? 1 II 6 $ it _lb ' i -- -.. i 1111 p, 4 N 28 Diverter i . , .., I' 1 4:: jr- 1-, cr e.' ill:, I Layout for .,,,, .,. .‘-‘. 2*f 1 Parker 272 T., Bend 14111 _- c- ...... (.48 13 III ,) i C. ' c...\/-*/ . I I 121 cl"---, T120' 1 I ii N i ..,z,....:\,:t. 1 r...••••••wirsen— 1 J.. 25$ 1 1 7 9 II II I I I 1 tii_2II 21 i I \--, ',....., I • • ��'P\\I%%� HE STAT E k *1'1m kZ G-..1 z,1(t C a E -t =�li'' 1 1 \ ts k -- 333 Wesi Sevens Avenue <v C ()\'F,RNt7RE ,NAI�NL) 1, Anchorage Alaska 99.501 3575 'Aalh 9h7 279 10,-3 Mary Endacott Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU N-28 BP Exploration(Alaska), Inc. Permit No: 214-127 Surface Location: 1483' FSL, 4728' FEL, SEC. 08, Ti 1N, R13E, UM Bottomhole Location: 1713' FNL, 2017' FEL, SEC. 17, T11N, R13E, UM Dear Ms. Endacott: Enclosed is the approved application for permit to drill the above referenced service well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, 1/.1P.71.4.4 --- Cathy . Foerster Chair DATED this day of September, 2014. STATE OF ALASKA 4 Iie i g:. + ALA•JIL AND GAS CONSERVATION COMM+ JN AUG 15 7014 • PERMIT TO DRILL 20 AAC 25.005 1 a.Type of work: 1 b.Proposed Well Class: 0 Development Oil 0 Service-Wini • ®Single Zone 1c.Specify if well is proposed for: - ® Drill 0 Lateral ❑Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 Coalbed Gas ❑Gas Hydrates ❑ Redrill ❑ Reentry 0 Exploratory • ®Service-WAG 0 Service-Disp ❑Geothermal ❑Shale Gas 2.Operator Name: 5. Bond ®Blanket 0 Single Well 11.Well Name and Number BP Exploration (Alaska) Inc. Bond No 6194193 • PBU N-28- 3. Address 6. Proposed Depth: 12. Field/Pool(s) P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 10450' • TVD 9166' • Prudhoe Bay/Prudhoe Bay - 4a.Location of Well(Governmental Section): 7. Property Designation(Lease Number): Surface: ADL 028282&028283 1483' FSL,4728' FEL, Sec. 08,T11N, R13E, UM Top of Productive Horizon: 8. Land Use Permit: 13.Approximate Spud Date: 1466' FNL,2059' FEL, Sec. 17, T11N, R13E, UM October 30, 2014 Total Depth 9.Acres in Property: 14.Distance to Nearest Property: 1713' FNL, 2017' FEL, Sec. 17, T11N, R13E, UM 2469&2480 28500' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 91' . feet 15.Distance to Nearest Well Open Surface: x 634410 • y-5967388- Zone- ASP4 GL Elevation above MSL: 43.9' . feet to Same Pool: 650' 16.Deviated Wells: Kickoff Depth: 300' • feet 17. Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 42 . degrees Downhole: 3288 • Surface: 2384 18. Casing Program Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) Driven 20" 129.4# X-52/56 ERW 120' Surface Surface 120' 120' 12-1/4" 9-5/8" 47# L-80 Hyd 563 3226' Surface Surface 3226' • 3152' 1709 sx DeepCrete, 266 sx Class'G' 8-1/2" 7" 26# L-80 VamTop HC 9733' Surface Surface 9733'- 8517' 226 sx Class'G' 6-1/8" 4-1/2" 12.6# 13Cr85 VamTop 875' 9575' 8371' 10450'. 9166' 129 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth TVD(ft): Junk(measured) Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): 20.Attachments: ® Property Plat ® BOP Sketch ® Drilling Program ❑Time vs Depth Plot 0 Shallow Hazard Analysis ® Diverter Sketch 0 Seabed Report ® Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date 22. I hereby certify that the foregoing is true and correct: Contact Jesse Rosenbaum,564-5155 Printed Name Mary Endacott Title Engineering Team Leader Email Jesse.Rosenbaum@bp.com t Signature j� 6dl Z -.- L I Phone 564-4388 Date 1//5/I Li Commission Use Only Permit To Drill ry API Number: �'7 -a > Permit Approval D1t'e: See cover letter for Number: ,,Z/y�1- 50-OZ�G �2. e C(- G)'It `JJ other requirements: Conditions of Approval: If box is checked,well may not be used to explore for,test, or produce coalbed methane,gas hydrates,or gas C] contained shales: Other: 30 p f-e 5-1- f0 436,c rJ 5 i Samples Req'd 0 Yes 12/No Mud Log Req'd: ❑Yes El No r-/d w pct c/af/e Iola i Vtci f iv to 00'c/i';71'n q H2S Measures: -Yes ❑ No Directional Survey Req'd: El Yes ❑No ptr 0,i,,IC Z5. 1'356h)(Z)- i Spacing exception req'd: 0 Yes E]No inclination-only svy Req'd: ❑Yes l'No /cr I-i‘o v.)e c fv SGt p etc k cr v tc' 4-5C 190 u 6bv6 top/ cr-(.15appr014-cl ycr 204/IC 25,4/206) .' ` .Z i1-rrvrrccl;�,tc Cu511-� d rep)r,z fio b..4 h) be rrviru' d •w M 11ACC trot t+9 ir:"11-i 41h_a «11v-ri • 4!U2g• 9dr'r -e/9 �/�i rr_ fir r /otJbi l r�f /;1 J APPROVED BY p APPROVED BY L_ L f�� 9a COMMISSIONER THE COMMISSION Date / -3 -/(i Form 10-401 Revised 10/2012 This peterRait tlinAto:the date of approval(20 AA 005( ) Submit Form and Attachments In Duplicate VLF /z//4 V .,�� ,' =--4. 7V y • • • 0 To: Alaska Oil&Gas Conservation Commission 5, From: Jesse Rosenbaum,ODE /7 �3�4 Date: August 14,2014 l 41 zi Re: N-28i Rotary Grassroots Permit to Drill A permit to drill is requested for a new grassroots injector well to be named N-28i.The primary target for injection is in the Ivishak Zone 2. N-28i well is currently scheduled to be drilled by Parker„272 beginning 10/30/14. The maximum anticipated surface pressure from the permeable reservoir sands is 'psi (assuming the predicted max PP of 7.25 ppg at TD). Parker 272 is equipped with 5000 psi rated four preventer BOP stack (3 rams and an annular). The rams will be tested to 4000 psi and annular to 3500 psi.An Area of Review has also been included for this proposed injector and is included in the permit. The plan for N-28i includes the following: 1. The pre-rig well work will include installation of the conductor,welding of the landing ring, install of the lined cellar box,and prepping of the location for the rig to move over the well. 2. MIRU Parker 272 and function test the diverter. 3. MU 12-1/4"bent housing motor drilling assembly. Drill to the deepest shale in the SV3 sands at-3218' MD. 4. Run 9-5/8"surface casing and cement to surface. - 5. NU BOP and test. 6. Drill 8-1/2" hole to TSGR at 9733' MD. 7. Run and cement 7"casing to at least 1500'above casing shoe. 8. Drill 6-1/8" production hole to a planned final TD at the top of the Kavik shale at-10450' MD. 9. Run and cement a 4-1/2" production liner. 10. Run a 4-1/2"completion tubing string,sting into liner tieback sleeve and set production packer. 11. RDMO well. Please find attached the N-28i planned well summary, directional plan, and proposed completion diagram. If you have any questions or require any additional information, please contact me. Jesse Rosenbaum,ODE Office:(907)564-5155 Cell:(406)533-8984 Email:Jesse.Rosenbaum@bp.com N-28i PTD Page 1 8/14/2014 4 • • Planned Well Summary et Well N-28i Well Injector ' Objegt ve Zone 4 , Current Status NA- Grassroots Injector Estimated Start Date: 10/30/14 Time to Complete: 27 Days Surface Northing Easting Offsets TRS Location 5967387 634410 3796' FNL/4728' FEL 11N 13E sec 8 TSAD (Zn4) Northing Easting TVDss Offsets TRS 5964487 637142 8540 1466' FNL/ 2059' FEL 11N 13E sec 17 BHL Northing Easting TVDss Offsets TRS 5964242 637190 9075 1712' FNL/ 2016' FEL 11N 13E sec 17 Planned KOP: 300' MD/ 216' TVDss Planned TD: 10,450' MD/9,166 TVD Rig: Parker 272 BF/RT: 43.9'/47.1' RTE: 91' Directional: Schlumberger(P8) Maximum Hole Angle: ^'42°in the surface interval —25°in the 6-1/8" production interval Close Approach Wells: _ No close approach wells requiring minor risking. Survey Program: 43'to 700' MD=gyro single shots 700'to 10450' MD=MWD+IIFR+MS Nearest Property Line: 28,500' Nearest Well within Pool: 650' N-28i PTD Page 2 8/14/2014 • • AOR Summary: For Service Wells Only List any wells in any reservoir where injection is planned,that are within 1/4 Dist,Ft. Annulus Integrity Comments mile of any point along the planned well path within the reservoir section After a tubing swap RWO in May-2004,the new tubing passed an MIT-T to 3500 psi, N-21A 650 and also passed an MIT-IA on the rig to 3500 psi proving the integrity of the 9-5/8" production casing down to the production packer. The annulus pressure plots look well behaved,as well. A RWO in July-2008 swapped the tubing and replaced the top 2000'of 9-5/8" production casing. On the rig the well passed a 3500 psi MIT-IA confirming the N-12 830 integrity of the new and old 9-5/8"production casing down to the production packer. The annulus pressure plots do show allow IAxOA communication,but it is small enough to be manageable by bleeds. This slight communication is very improved since the 2008 RWO. N-22 680 The N-22A bore was a CTD sidetrack that kicked off in the reservoir section,so no change in annulus between N-22 and N-22A. See N-22A for more detail. The annulus below—7400'MD was abandoned in 2007 when the well was rig sidetracked to N-22B. The N-22A CTD liner and tubing tail were abandoned via a cement plug pre-rig,and passed a subsequent MIT to 2000 psi. A pre-rig CMIT-TxIA passed to 3500 psi proving the 9-5/8"competency down to the old production packer at 9712'MD. On the rig in 2007 the tubing was pulled and the 9-5/8"casing N-22A 680 down to 1800'was replaced,and an EZSV was set at 7240'MD. The well was sidetracked,and after new tubing was installed,an MIT-IA to 4000 psi passed on the rig,confirming the integrity of the newly modified annulus. This old new 9-5/8" passed an MIT proving its competency above 7240'MD. An additional MIT-IA to 3000 psi passed in 2008 as well,and two OA repressurization tests since then have showed no/minimal buildup rate. The following information is provided as it relates to the relevant cement jobs on the wells within 1/4 mile of this injection well. 2 l N-21- N-21 was drilled in 1985. The 9-5/8" Intermediate casing string was cemented with 360 bbls of 13.2 ppg lead cement followed by 35.6 bbls of Class "G" tail cement with no losses. !"1 L k 5,»:2 Assuming 30% excess, that places TOC at 5,011' MD. N-21 7" liner was later P&A'd with for the N-21A sidetrack. 115 bbls of "G" (3000 ft) balanced plug was placed in the liner. N-21A was a single string high-angle sidetrack that was drilled in 1998. The 4.5" liner was fully cemented. The plug did not bump on strokes. 15 bbls of cement were circulated off the top of the liner. The initial pressure test on the 4.5" failed and a 3.5" cleanout run with a motor BHA was run to cleanout cement stringers and the motor backed off and left on bottom. A CIPB was set above the motor and the 4.5" liner passed a pressure test to 3500 psi. TOC at 10,412' MD. N-12 - N-12 was drilled in 1981 as a 3 string grassroots producer. This 13-3/8" surface hole was cemented with 712 bbls of 14.9 ppg "Permafrost" Cement and did not achieve cement to surface. A top job was performed w/ 1-1/4" pipe with an additional 35 bbls and achieved cement to surface. The 9-5/8" Intermediate casing was a 2-stage job run and cemented with N-28i PTD Page 3 8/14/2014 0 • 288.5 bbls of 16 ppg class "G". The plug did not bump. The second stage was pumped through a DV packer and 25 bbls of additional cement was pumped. Tested to 3000 psi. A USIT run in 2008 showed TOC at 2650' MD. The 7" Production liner was run and cemented with 20 bbls of 16 ppg / class "G" cement. With no losses during the cement job and the plug bumped on strokes and cement was circulated off the top of the liner. Tested to 3000 psi. A RWO was performed in 2008 to repair a casing leak in the 9-5/8" casing. The 9-5/8" casing was cut and pulled to surface from 2080' MD. A new 9-5/8" casing string was tied back and cemented to surface with 145 Bbls of 15.8 class "G". N-22 - N-22 was drilled as a 3-string producer in 1985. It is currently has OA x IA communication. The 13-3/8" Surface casing was run and cemented at 2700' MD with 579 bbls of 12.2 ppg permafrost "E" cement and achieved cement returns to surface. The 9-5/8" Intermediate casing was run to 10,118' MD and cemented with 336 bbls of 13.2 ppg Lead cement followed by 41 bbls of class "G". Assuming 30% excess, TOC is 4,826' MD. The 7" production liner was run and fully cemented with 69.2 bbls of class "G" cement. N-22A - was a CTD sidetrack that was drilled in 1998. The 2-3/8" liner was cemented with 18.4 bbls of 15.8 class "G" cement and circulated excess cement off of TOL. The wellbore was P&A'd for a rotary sidetrack in 2006. Service coil pumped 23 bbls of 15.8 ppg class "G" cement at 1:1 with 100% returns. TOC was tagged at 9512' MD and pressure tested to 3500 psi. AOR Area �t « 23�A ", <<-14',-ld e-09A — 'V x ::1-'4:.a 5970000 4 _, 3 i 1,,-'46 --- #' I A, t r sop -08A \\�\ " _ ap 11*1 �# -07A ,•-! iiikii07 .-27A tt -04 5968000 08 20A .1w 04A 2S .'-0 -02A 2 -10A .i...,1,':' ilk h .-21 5966000 *I01 � , 12 -30 A\ 0' (5•- 056 '1°% Q it 05A 04 d�?'�` 05 0 116 g ,t1i 40 �-/>'� -2:} 5963001 p. q1.Jc '4 „ -226 ,f$A k03 -26 #-11A 25 f''^- i p,"' n c3-I 632001 634000 636000 I.•: III 640000 612000 o4411.1� N-28i and N-29i 1/4 Mile Radius 0 1000 2000 06/23/2014 U.S. surveyor's feet N-28i PTD Page 4 8/14/2014 • • Formation Tops & Pore Pressure Estimate (SOR): Estimated Most Likely Maximum / Depth Fluid PA-IAIVe--C // Formation Formation Top Pore Pressure Pore Pressure Uncertainty Type a lr / /06 -67i> (TVDss) (EMW ppg) (EMW ppg) (+/-TVD ft) (for sands) �Iij L� G1 370 8.40 8.45 ±20 ,4.. -'7.c) SV6 1,660 8.40 8.45 ±20 BPRF 1,950 8.63 8.90 . ±20 SV5 2,250 8.43 8.50 ±20 b- /• e) SV4 2,455 8.43 8.50 ±20 SV3 2,896 8.43 8.50 ±20 95/w.Casing 3,060 8.43 8.50 ±20 SV2 3,110 8.43 8.50 ±20 8•p -,9, SV1 3,400 8.43 8.50 ±20 UG4 3,800 8.93 9.50 • ±20 UG3 4,125 9.30 • 9.50 • ±20 UG1 4,575 8.93 9.50 ±20 WS2 5,105 8.68 9.00 . ±20 WS1 5,290 8.68 9.00 • ±20 CM3 5,460 9.08 9.80 - ±20 ` CM2 6,315 9.65 10.00 / ±50 /. 7 ib,p CM1 6,405 9.65 10.00 / ±50 / THRZ 6,720 9.75 10.00 / ±40 BHRZ 6,960 9.75 10.00 / ±40 LCU 6,966 9.70 9.80 ±40 TJH 7,134 9.70 9.80 ±40 /d, t ---- io•3 TJG 7,156 9.70 9.80 ±40 TJF 7,476 9.75 9.90 ±40 TJE 7,639 9.75 9.90 ±40 TJD 7,864 9.75 9.90 ±40 TJC 8,125 9.75 9.90 ±40 TJB 8,256 10.05 10.50 / ±20 TJA 8,328 10.05 10.50 / ±20 TSGR 8,420 7.08 7.33 ±20 Gas 7"Casing 8,425 7.08 7.33 ±20 TSHU 8,455 7.07 9.95 / ±20 TSAD 8,540 7.05 7.25 ±20 Gas S �, 4558 8,560 7.05 7.25 ±20 Gas 4258 8,650 7.03 7.25 ±20 Gas TCGL 8,715 7.01 7.25 ±20 Gas PGOC 8,770 7.00 7.25 ±10 Gas BCGL 8,790 7.00 7.25 ±20 Oil POWC 8,825 7.00 7.25 ±10 Water 23SB 8,845 7.00 7.25 ±20 Water 22TS 8,895 7.00 7.25 ±20 Water 21TS 8,955 7.00 7.25 ±20 Water MHO 8,962 7.00 7.25 ±10 Water TZ1B 9,033 7.00 7.25 ±20 Water r�;. 4 1/2"TD 9,075 7.00 7.25 ±20 Water ( b TDF 9,076 7.0 7.3 ±20 Water BSAD 9,114 7.0 7.3 ±20 Water 7 / O/4 /- .-)L. 51`" . 24- -/. / ?Atte(K-e-d s.„(Act wt. N-28i PTD Page 5O 8/14/2014 • • Casing/Tubing Program Hole Casing/ Wt/Ft Grade Conn Burst Collapse Length Top Bottom Size Tbg O.D. (psi) (psi) MD/TVDss MD/TVDss Driven 20" 129.4# X-52/56 ERW Insulated 120' Surface 120'/36.7' 12-1/4" 9-5/8" 47# L-80 Hyd 563 5,750 3,090 3226' Surface 3226'/3060' 8-1/2" 7" 26# L-80 VaH�op 7,240 5,410 9733' Surface 9733'/8425' 9575'/8288' 6-1/8" 4%" 12.6# 13Cr-85 Vam-Top 8,430 7,500 875' ("'150' into 7" 10450'/9075' csg) Tubing 4%" 12.6# 13Cr-85 Vam-Top 8,430 7,500 9580' Surface 9580'/8293' ("'5' into TBS) Mud Program Surface Hole Mud Properties: HFGBM 12-1/4" Hole Section Density LSYP YP API FL Chlorides Funnel Depth Intervalppg 2x3-6 Ib/100 ft2 m1/30min mg/I pH Viscosity sec/qt 0'-2070' (BPRF) 8.6-9.0- 40-60 50-80 NC <1000 10.3- 11 60-120 2070' -Section TD 8.6-9.0 - 30-40 30-50 NC <1000 10.3-11 60-120 Intermediate Hole Mud Properties: LSND 8-1/2" hole section Depth Interval(MD) Density PV YP API FL HTHP FL MBT PH ppg 3226'—7190' 8.8—9.5 • 8-16 18-28 <6 NC <15 9-10 7190' -8200' 9.7—9.9 8-16 18-28 <6 NC <15 9-10 8200'—Section TD 10.1—10.3 10-20 17-28 0-6 <10 <20 9-10 Production Mud Properties: Biopolymer Reservoir Drill-in Fluid 6-1/8" hole section Depth Interval Density(ppg) PV YP LSVR API FL pH MBT 9733'-TD 8.5—8.7 , <12 20-28 >15,000 >8 9.0-9.5 <4 Logging Program (17) Well Evaluation Requirements Interval MWD/LWD OH Logs CH logs Coring Sampling Surface GR Intermediate Cement log per Sample as GR/Res . state and if necessary to needed for 10-60 identify ICP Production Circumferential Sample as GR/Res/Neutron cement log and necessary to /Density RPM(post rig) identify MHO/HOT • Tie-in requirements if a sidetrack: N-28i PTD Page 6 8/14/2014 __ • • GR in surface hole for correlation and setting SCP. GR/Res in intermediate section are for correlation of the section and casing point selection. GR/Res/Porosity logs in the reservoir section are for formation Objectives for evaluation and reservoir fluid identification. Samples are necessary for picking intermediate casing, evaluation program: reservoir quality and MHO/HOT identification. RPM will provide surveillance baseline. Mandatory 7"Cement Log(State requirement for Service Well)Possible cement evaluation LWD Comments: (SoniScope). Production interval cement logs will be done post rig. RPM post rig. Cement Program Casing Size 9-5/8"47#, L-80, HYD 563,Surface Casing Lead:Open hole volume+350%excess through permafrost and 40%excess below Basis: permafrost. Port collar used if hole conditions dictate. Lead TOC:Surface Tail:Open hole volume+30%excess+80 ft shoe track Tail TOC:^'700 ft MD above casing shoe Total Cement Spacer 100 bbls of Viscosified Spacer weighted to 10 ppg(Mud Push II) Volume: Lead 554 bbls,3110 cuft, 1709 sks of 11.0 ppg DeepCRETE,Yield 1.82 ft3/sk Tail 55 bbls, 308.8 cuft, 266 sks of 15.8 ppg Class G+adds—1.16 ft3/sk Casing Size 7"26#, L-80,VTHC Intermediate Casing Basis: Lead: None Tail: Volume of 1500' open hole above the shoe+30%excess+80'shoe track. Tail TOC at^'1500'above shoe at 8225' MD. Total Cement Spacer 30 bbls of Viscosified Spacer weighted to 12.0 ppg(Mud Push II) Volume: Lead N/A Tail 47.1 bbls, 264 cuft, 226 sks 15.8 lb/gal Class G+adds—1.17 cuft/sk Casing Size 4.5" 12.6#,13Cr Production Liner Basis: Lead: None Tail: Volume of open hole+30%excess+80'shoe track+150' of liner lap+200'of 7"x 4" DP excess.+ 10 bbl excess Tail TOC: ^'9570' MD (cement at TOL w/excess to be circulated out) Total Cement Spacer 30 bbls of Viscosified Spacer weighted to 10 ppg(Mud Push II) Volume: Lead N/A Tail 26.9 bbls, 151cuft, 129 sks 15.8 lb/gal Class G+GasBlok+adds—1.17 cuft/sk Surface and Anti-Collision Issues Surface Shut-in Wells: There are no wells requiring surface shut-in in order to move onto the well. Close Approach Shut-in Wells: There are no close approach wells that fail the major risk rule. No minor risking rules will need to be applied. N-28i PTD Page 7 8/14/2014 • • Hydrogen Sulfide (6) H2S Data Is this a H2S pad? No Well Name H2S Level Reading Date Comments Parent Well(if sidetrack) n/a #1 Closest SHL Well H2S Level N-01A 14 ppm 1/10/2014 #2 Closest SHL Well H2S Level N-24 10 ppm / 3/17/2014 #1 Closest BHL Well H2S Level N-21A 26 ppm / 3/18/2014 #2 Closest BHL Well H2S Level N-16 8 ppm 1/17/2013 #3 Closest BHL Well H2S Level N-22B 12 ppm 1/12/2014 #4 Closest BHL Well H2S Level N-12 4 ppm1/17/2014 Max.Recorded H2S on Pad/Facility N-26 56 ppm / 1/6/2009 No wells are projected to be injecting,nor processing MI during 2014. IF for some Other Relevant H2S Data reason that plan changes,please be aware that MI carries a 100+ppm MI (H2S alarms from rigs,etc.) concentration. _ Faults No faults are planned to be crossed in the current directional plan. • Drilling Waste Disposal • There is no annular injection in this well. - • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS- 04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul Class I waste to DS-04 and/or Pad 3 for disposal / Contact the GPB Environmental Advisors (659- 5893)f/guidance. N-28i PTD Page 8 8/14/2014 • • Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below,BOP equipment will be tested to 4,000 psi. BOP regular test frequency will be 14 days during drilling phase and 7 days during de- completion and surface casing work. Intermediate Interval Maximum anticipated BHP 3174 psi @ TSGR at 8420 TVDss(7.25 ppg EMW) Maximum surface pressure 2332 psi(.10 psi/ft gas gradient to surface) ✓' 25 bbls with a 11.6 ppg frac gradient,and 50 bbls with a 12.63 ppg frac Kick tolerance gradient, assuming a 7.08 ppg most likely pore pressure in the Sag and 10.2 ppg MW at TD. Planned BOP test pressure Rams test to 4,000 psi/250 psi. Annular test to 3,500 psi/250 psi 9-5/8"Casing Test/7"Casing 4000 psi surface pressure Integrity Test—8-1/2"hole LOT after drilling 20'-50'of new hole 7"Casing The VBRs will be changed to 7" rams to accommodate the 7"casing Production Interval Maximum anticipated BHP 3288 psi @ TZ1B at 9033'TVDss(7.0 ppg EMW) Maximum surface pressure (2384 p i (.10 psi/ft gas gradient to surface) In-finite with 12.73 ppg most likely frac gradient, assuming a maximum 7.25 Kick tolerance ppg max pore pressure at TD and 8.6 ppg MW.(8.83 ppg FIT needed for infinite kick tolerance.) Planned BOP test pressure Rams test to 4,000 psi/250 psi. Annular test to 3,500 psi/250 psi Integrity Test—6-1/8"hole FIT after drilling 20'-50'of new hole 4-1/2"Production Liner 4000 psi surface pressure Planned completion fluids 8.5 ppg Seawater/6.8 ppg Diesel Variance Requests: 1. To avoid the risk of plugging the flow line with large rocks and wood encountered while drilling surface hole, it is requested to drill without a flow paddle for the first portion of the surface hole. While the flow paddle is removed from the flow line, PVT alarms will be used and the pit levels accurately monitored for any pit gain. Also,a visual check will be made during connections by looking down the riser to ensure the well is not flowing. After returned debris that could plug the flow line diminishes the flow paddle will be reinstalled. 2. Due to the geometry of the production interval,the production packer must be set outside 200'of the producing interval.This is a variance from the regulation to set the production packer within 200 ft of the producing interval. N-28i PTD Page 9 8/14/2014 ! . • • Parker 272 Diverter and BOPE Schematics* PARKER 272 BOP STACK RAM TYPE BOP: DUTCH LOCK DOWN FLANGE SHAFFER LXT DOUBLE BOP 13 5/8"-5M D 13 5/8"-5M STUDDED TOP 13 5/8"-5M FLANGED BOTTOM t=g''` W/(2) 14" UL2 OPERATOR, UPPER CAVITY ANNULAR BOP: AND (2) 14" PSLK W/BSTR OPERATOR, lirffffit fffl?NI Iii SHAFFER LXT 13 5/8"-5M LOWER CAVITY 13-5/8" 5M STUDDED TOP 0 13-5/8" 5M FLANGED BOTTOM 0 1 I DRILLING CROSS: 1 I 13 5/8"-5M FLANGED TOP - q] I I i 13 5/8" 5M FLANGED BOTTOM al °°°°"� «L 3 W (2) 3 1/8"-5M SIDE OUTLETS 1 • ° II e 8 ° II E___11 a...- c). . r3 7 ••.P ��%i •• r U — KILL LINE: QV\ ��MI% , `� � 2-1/16" 5M FLEX HOSE V 9I l36, I.r • I= 7 •� � � 2 7/16" SM X 3-1/8" 5M D.S.A. � ° � ♦ � 3-1/8" 5M FLANGED MANUAL GATE VALVE CD 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE E �r'y 3 E• ■�' °°° �� ' ■ 3 I 1 I CHOKE LINE: RAM TYPE BOP: 3-1/8" 5M FLANGED MANUAL GATE VALVE _ SHAFFER LXT SINGLE 13 5/8" 5M 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE 13 5/8"-5M STUDDED TOP 8" 5M FLEX HOSE 13 5/8"- 5M FLANGED BOTTOM 3-1 / w/(2) 14" UL2 OPERATOR N-28i PTD Page 10 8/14/2014 i Wel!plan Addendum Contingency for well control when non-shearable equipment is across the BOPE shear rams This document will provide guidance for rig operations when a well control event arises and there is non-shearable equipment hanging from the derrick across the BOPE shear rams. Prior to picking up or running any equipment or tools in the hole, a PJSM and discussion is required to identify and note any equipment which will be run through the BOPE and is non- shearable. A risk assessment shall be performed for any equipment which is deemed non-shearable. The risk assessment must address the following: 1. Can variable bore rams seal against the equipment? 2. Can an annular preventer seal against the equipment? ✓ 3. Is a cross-over readily available to make-up into equipment? 4. Is a single joint or full stand of DP readily available to lower equipment below the BOPE stack? 5. How the equipment can be intentionally dropped down hole. 6. Are weights of equipment known so that hydraulic jacking force of wellbore pressure can be calculated. 7. Accurate and up to date shearing capabilities for the current shear rams installed is available. 8. Has each crew member been versed on individual roles and responsibilities? If there is a well control event happens with non-shearable equipment across the BOPE shear rams, the following procedure should be followed: 1. Based on the risk assessment above, gain control of the well by either: a. Closing the appropriate preventer (pipe ram, VBR, or annular) or b. Placing a sealable piece of equipment across the BOPE and closing the appropriate preventer or c. Dropping equipment and closing the Blind or Blind/Shear rams. 2. If well conditions permit, contact appropriate personnel. If not, proceed with well kill operations. This may include placing shearable equipment (i.e. drillpipe) across the shear rams by stripping in/out of the hole. N-28i PTD Page 11 8/14/2014 • • N-28i General Operational Summary Proposed Pre-rig prep work: 1. Install 20"conductor casing 2. Weld the landing ring on the conductor 3. Install cellar box 4. Prep pad and location for the rig to move over the well Planned Rig Work: 1. MIRU Parker 272.Take on 8.7 ppg Drilplex 2. NU diverter spool &riser. Function test the diverter. 3. PU 4"drill pipe as required to TD the surface interval and stand back in the derrick. 4. MU the 12-14" drilling assembly with DIR/GR/RES on bent housing motor. Spud and directionally drill surface hole to base of permafrost. Gyro survey until magnetic interference clears up. CBU until hole is clean, then short trip to surface. 5. RIH and continue drilling surface hole to section TD at 3217 ft MD in deepest SV3 shale. CBU until hole is clean. POOH on elevators (if necessary pump out of hole, RIH to bottom until able to POOH on elevators). Lay down BHA. 6. Run 9%",47#, L-80, Hyd 563. Fully cement to surface,displacing cement with drilling fluid. 7. Nipple down the diverter spool and nipple up/test casing and tubing head. Nipple up the wellhead and BOPE (Configured from top to bottom:annular preventer,7"fixed, blind/shear, mud cross,2-V8"x 5%"VBR).Test the rams to 250-psi low/4000-psi high,and the annular to 250-psi low/3500-psi high. 8. Pressure test the 9-%"casing to 250 psi low/4000 psi high for 5 minutes low/30 minutes high. 9. MU the 8-1/2"drilling BHA with PDC bit, RSS and DIR/GR/RES/PWD and RIH to float collar picking up 4"drill pipe as required to TD the intermediate interval. 10. Drill shoe track and displace well to 9.4 ppg LSND drilling fluid. 11. Drill 20 ft of new formation below 9-%"shoe and perform LOT per SOP. 12. Drill 8-1/2"intermediate interval to section TD in TSGR at^'9,735' MD.Weight up drilling fluid using spike fluid to 10.3 ppg 200' above the HRZ. ' 13. Circulate until hole is clean and condition mud for running the 7"casing. 14. Short trip while rolling the pumps at 1A-1 BPM to top of HRZ to minimize swab. RIH to TD and CBU. Note cutting returns and fill on bottom. 15. POOH on elevators rolling pumps to top of HRZ and lay down BHA(if backreaming to get out of open hole is necessary,trip back to TD and POOH on elevators final trip out). 16. Run 7", 26#, L-80,VAM TOP HC casing. CBU at surface casing shoe. Wash down every 10th joint. Do not . circulate through the HRZ/Kingak until pipe is in the Sag River. 17. Stage pumps up and condition mud for cement job. Cement the 7"casing to 1500' MD above the v, intermediate casing shoe. 18. Pressure test the 7" casing to 250 psi low/4000 psi high for 5 minutes low/30 minutes high when the plug bumps. 19. Immediately following the casing pressure test, initiate injection down the OA by pumping 5 bbls of drilling fluid to ensure annulus remains open for freeze protection.Continue to pump 3-5 bbls of drilling fluid down the OA every hour until the cement reaches 500 psi compressive strength. 20. Install the 7"casing pack-off through the stack and test to 250 psi low/5000 psi high for 15 minutes. 21. Change upper 7"casing rams to VBR rams and test to 250 psi low/4000 psi high. 22. Freeze-protect the 9-%"x 7"annulus,once the tail cement has reached 500 psi compressive strength. 23. MU the 6-1/."drilling BHA with tri-cone mill tooth bit, bent housing motor,and DIR/GR/RES/NEU/DEN Continue RIH and begin drilling out shoe track. 24. Displace the well to 8.6 ppg FloPro SF fluid prior to fully drilling out shoe track. 25. Drill 20 ft of new formation and perform an FIT. 26. Drill 6-1/8" hole to planned TD at '10,450 ft MD per directional plan. • N-28i PTD Page 12 8/14/2014 • • 27. Circulate bottoms up as required to clean the hole. POOH on elevators(MAD pass if necessary)to the 7"casing shoe.Circulate bottoms up inside the shoe.Trip in hole on elevators to TD.Circulate bottoms up and pull out of hole on elevators. Lay down drilling BHA. 28. MU and run 4-%" 12.6#13Cr liner to TD. 29. Stage pumps up and condition mud for cement job. Cement the 4-1/2" liner to TOL, displacing with seawater. 30. Set liner hanger and liner top packer. Displace well to clean—8.5 ppg seawater above the liner top. 31. Pull out of hole with 4"drill pipe and lay down liner running tool. 32. RU and run a 4-%2", 12.6#, 13CR,VAMTOP tubing with GLMs.Space out and land the tubing with tubing tail inserted into the liner tieback sleeve. Run in lock down screws. 33. Reverse circulate 8.5 ppg seawater surface to surface.Spot 8.5 ppg corrosion inhibited seawater in the tubing x casing annulus. 34. Drop the ball/rod and land on the RHC-M no-shear seat in the XN-nipple.Set packer and individually test the tubing and annulus to 4000 psi for 30 minutes. Record each test. 35. Shear the DCK valve in GLM. 36. Freeze protect the well by reverse circulating through the IA to—2,200'TVD and allow diesel to U-tube 37. Install TWC and test from above and below to 250 psi low/4000 psi high for 5 minutes each. 38. Nipple down the BOPE. Nipple up the adaptor flange and tree and test to 250 psi low/5,000 psi high for 5 minutes each with diesel. 39. Secure the well. Rig down and Move Off. Post Rig 1. Pull BPV/tree work. 2. SL pull B&R and drift to PBTD. 3. Coil cleanout to PBTD if SL unable to drift to PBTD. 4. E-line run cement log. 5. Perforate post rig. 6. Warm MIT-IA once on injection. N-28i PTD Page 13 8/14/2014 • N-28i Drilling Hazards and Contingencies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. Surface Hole—the interval is normally pressured. No shallow gas is expected in the interval, and there are no reported incidents of offsets running into overpressured zones or shallow gas. Planned mud weight will range from 8.7-9.0 ppg. B. Intermediate Hole-the planned mud weight will be ranging from 9.4—10.3 ppg depending on depth of drilling. Sufficient mud weight will account for: 1. Potential cretaceous injection pressures(9.3 ppg max). 2. Predicted Colville pressures(9.65 ppg max). • 2. Sag River pore pressure(7.1 ppg max). 3. HRZ and Kingak shale stability(10.1-10.3 ppg). • C. Production Hole -The Sag River and Ivishak formations in this area are expected to be under-pressured at 7.1 ppg EMW. This interval will be drilled with a 8.6 ppg reservoir drill-in fluid. II. Lost Circulation/Breathing A. Surface Hole- N-pad has a history of heavy concentrations of gravel and some wells have required top jobs to get cement to surface. Drilling with properly maintained MMO mud has alleviated many surface hole problems recently. Lost circulation is considered a moderate risk. • B. Intermediate Hole - While no major lost circulation is expected in this interval of the well, breathing and/or • lost circulation is a possibility due to exposing formations from the 9-5/8" casing shoe to the TSGR to drilling ECD's associated with the planned 10.1-10.3 ppg mud density. An ECD hardline of 11.8 ppg EMW will be set while drilling the intermediate interval. C. Production Hole -There is a history of lost circulation in the production hole at N-pad. Most of these events are associated with crossing faults. There are no planned fault crossings in the production hole, but if lost circulation is encountered,follow the mud program's lost circulation decision tree. III. Kick Tolerance/Integrity Testing A. With the planned mud weights, the frac gradient required for a 25 bbl kick tolerance in the intermediate section is 11.6 ppg, 12.63 ppg for a 50 bbl kick tolerance, and 8.83 ppg for an infinite kick tolerance in the production section. B. Integrity Testing Test Point Test Depth Test type EMW(Ib/gal) 9-%"window 20'-50'from the 9-%"window LOT 11.6 minimum(25 bbl KT), 12.63 target(50 bbl KT) 7"shoe 20'-50'from the 7"shoe FIT 8.83 minimum (Infinite KT) N-28i PTD Page 14 8/14/2014 • • • IV. Hydrogen Sulfide (6) H2S Data Is this a H2S pad? No Well Name H2S Le.4e1 Readinc Date Comments Parent Well(if sidetrack) #1 Closest SHL Well H2S Level rJ-27 6 pp-i 3282014 #2 Closest SHL Well H2S Level rJ-1= 24 pp-i 1:162014 #1 Closest BHL Well H2S Level R-12- 20 pp-1 3212014 #2 Closest BHL Well H2S Level ti-i 24 pp'n 1162014 #3 Closest BHL Well H2S Level 11-Of 36 pp-n 12.7.2008 #4 Closest BHL Well H2S Level R-1=E 108 pp 1:'122014 Max.Recorded H2S on PadTacility rJ-02 71pp^1 12.-=.2010 1 2:14-pp i Npad is not an H2S pad but reservoir could see higher H2S values.see R- 148 H2S level above. Other Relevant H2S Data rJ-20 surface location cet,+;een tl-27 and N-i f iF#12 (H2S alarms from rigs.etc.) LII has 12fpp-i H2S. Last injected LII in 2012 and no plan for Ml injection until after USI conversion. Prior to MIRU.cheep:that Ml is not ceing injected. V. Faults There are no planned fault crossings with the current directional plan. - VI.Anti-Collision Issues No wells fail Major risk in the current wellplan.The rig will use the TC plot as a reference while drilling. CONSULT THE N-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. N-28i PTD Page 15 8/14/2014 TREE= 4-1/16" moo' *s1 -28iPropose Proposed,AW P#9 ACTUATOR= KB_ELEV= BF.ELEV= I ' KOP= Max Angle= —�� 20"CONDUCTOR H -.100' = i TBD 9-5/8"TAM PORT COLLAR Datum MD= Da , , tumWDss= 8800' —2000' —4-1/2"HES X NP,D=3.813" 9-5/8"47# L80 ,HYD 563,1)=8.681" 3,226'M D ' 8225' MD 1TOC-1500'15.8 PPG Class•G" GAS UFT MANDRELS TVD DEV TYPE VLV LATCH PORT DATE XXXX KBG2 • XXXX KBG2 XXXX KBG2 I )OCXX KBG2 9300' --I4-1/2"HES X NP,ID=3.813" 9 9320' -17"X 4-1/2"HES TNT PKR V �� D=3.870" 9375' _H4-1/2"HES X NIP,ID=3.813" 4-1/2'TBG 12.6#13Cr-80 VT.0152 bpf ID=3.958" H 9,576' x4 • 9382' H 4-1/2"HE'S XN NP,ID=3.725" 8575' H 7"X 5'BKR ZXP PKR&Rex lock HGR w/TEBACK SLV,D=4.4" 7"CSG,26#,L-80,VT HC,.0383 bpf,ID=6.276" —I 9733' M D 9578' MD H WLEG 9575'MD —{TOC of Fully Cemented Liner •a • a ' 4-1/2"Solid LNR,12.6#,13Cr-80,HYD 521,ID=2.--I —10,450' j . e 08/11/14 JBt Proposed Completion WP#9 WELL: N-28i PERMIT No: # API No: SECO8 TWPI 1 N R13E FSL 1483'FEL 4728' BP Exploration(Alaska) • • Qbp North America - ALASKA - BP Prudhoe Bay PB N Pad Plan N-28 50029xxxxx00 Plan N-28 Plan: N-28 Plan 9 Standard Planning Report - Geographic 12 August, 2014 rpI BAKER HUGHES BP S ri.l111 . bp Planning Report-Geographic BAKER HUGHES Database: EDM R5K-Alaska PROD-ANCP1 Local Co-ordinate Reference: Well Plan N-28 • Company: North America-ALASKA-BP TVD Reference: N-28 @ 91.00usft(Parker 272) Project: Prudhoe Bay MD Reference: N-28 @ 91.00usft(Parker 272) Site: PB N Pad North Reference: True • Well: Plan N-28 Survey Calculation Method: Minimum Curvature Wellbore: Plan N-28 Design: N-28 Plan 9 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) • System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) • Using Well Reference Point Map Zone: Alaska Zone 04 • Using geodetic scale factor Site PB N Pad,TR-11-13 Site Position: Northing: 5,965,420.89 usft Latitude: 70°18'48.671 N From: Map Easting: 633,404.63 usft Longitude: 148°55'7.73 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.02° Well Plan N-28 Well Position +NI-S 0.00 usft Northing: 5,967,387.55 usft • Latitude: 70°19'7.835 N +EI-W 0.00 usft Easting: 634,410.37 usft • Longitude: 148°54'37.36 W Position Uncertainty 0.00 usft Wellhead Elevation: Ground Level: 43.90 usft Wellbore Plan N-28 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGG M2014 11/15/2014 19.48 81.00 57,593 Design N-28 Plan 9 Audit Notes: Version: Phase: PLAN Tie On Depth: 47.10 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (0) j 47.10 0.00 0.00 139.56 Plan Sections Measured Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +NI-S +E/-W Rate Rate Rate TFO (usft) (°) (°) (usft) (usft) (usft) (°/100usft) (°1100usft) (°/100usft) (°) Target 47.10 0.00 0.00 47.10 0.00 0.00 0.00 0.00 0.00 0.00 307.70 0.00 90.00 307.70 0.00 0.00 0.00 0.00 0.00 90.00 607.70 3.00 90.00 607.56 0.00 7.85 1.00 1.00 0.00 90.00 957.70 10.00 90.00 955.10 0.00 47.45 2.00 2.00 0.00 0.00 1,307.70 14.79 114.43 1,297.07 -18.49 118.59 2.00 1.37 6.98 60.00 1 1 3,307.70 14.79 114.43 3,230.84 -229.58 583.31 0.00 0.00 0.00 0.00 4,255.11 42.20 132.24 4,056.78 -499.06 936.22 3.00 2.89 1.88 25.58 6,947.00 42.20 132.24 6,050.87 -1,714.76 2,274.85 0.00 0.00 0.00 0.00 7,826.50 25.00 170.00 6,788.25 -2,103.27 2,530.33 3.00 -1.96 4.29 144.39 9,926.50 25.00 170.00 8,691.50 -2,977.28 2,684.44 0.00 0.00 0.00 0.00 10,450.60 25.00 170.00 9,166.50 -3,195.42 2,722.90 0.00 0.00 0.00 0.00 8/12/2014 11:14:55AM Page 2 COMPASS 5000.1 Build 61 BP ri�� bp0 Planning Report Geographic BAKER HUGHES Database: EDM R5K-Alaska PROD-ANCP1 Local Co-ordinate Reference: Well Plan N-28 Company: North America-ALASKA-BP TVD Reference: N-28 @ 91.00usft(Parker 272) Project: Prudhoe Bay MD Reference: N-28©91.00usft(Parker 272) Site: PB N Pad North Reference: True Well: Plan N-28 Survey Calculation Method: Minimum Curvature Wellbore: Plan N-28 Design: N-28 Plan 9 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude l 47.10 0.00 0.00 47.10 0.00 0.00 5,967,387.55 634,410.37 70°19'7.835 N 148°54'37.36 W 100.00 0.00 90.00 100.00 0.00 0.00 5,967,387.55 634,410.37 70°19'7.835 N 148°54'37.36 W 200.00 0.00 90.00 200.00 0.00 0.00 5,967,387.55 634,410.37 70°19'7.835 N 148°54'37.36 W 300.00 0.00 90.00 300.00 0.00 0.00 5,967,387.55 634,410.37 70°19'7.835 N 148°54'37.36 W 307.70 0.00 . 90.00 307.70 0.00 0.00 5,967,387.55 634,410.37 70°19'7.835 N 148°54'37.36 W Start Build 1.00 400.00 0.92 90.00 400.00 0.00 0.74 5,967,387.57 634,411.12 70°19'7.835 N 148°54'37.34 W 461.02 1.53 90.00 461.00 0.00 2.05 5,967,387.59 634,412.42 70°19'7.835 N 148°54'37.30 W G1 500.00 1.92 90.00 499.96 0.00 3.23 5,967,387.61 634,413.60 70°19'7.835 N 148°54'37.27 W 600.00 2.92 90.00 599.87 0.00 7.45 5,967,387.69 634,417.83 70°19'7.835 N 148°54'37.14 W 607.70 3.00 90.00 607.56 0.00 7.85 5,967,387.69 634,418.22 70°19'7.835 N 148°54'37.13 W Start Build 2.00 700.00 4.85 90.00 699.64 0.00 14.17 5,967,387.81 634,424.54 70°19'7.835 N 148°54'36.95 W 800.00 6.85 90.00 799.12 0.00 24.35 5,967,387.99 634,434.72 70°19'7.835 N 148°54'36.65 W: 900.00 8.85 90.00 898.18 0.00 38.00 5,967,388.23 634,448.37 70°19'7.835 N 148°54'36.25 W 957.70 10.00 90.00 955.10 0.00 47.45 5,967,388.40 634,457.81 70°19'7.835 N 148°54'35.98 W Start DLS 2.00 TFO 60.00 1,000.00 10.45 94.04 996.73 -0.27 54.95 5,967,388.27 634,465.31 70°19'7.832 N 148°54'35.76 W 1,100.00 11.68 102.26 1,094.87 -3.06 73.89 5,967,385.82 634,484.30 70°19'7.805 N 148°54'35.21 W 1,200.00 13.11 108.82 1,192.54 -8.87 94.52 5,967,380.38 634,505.03 70°19'7.748 N 148°54'34.60 W 1,300.00 14.66 114.07 1,289.62 -17.69 116.80 5,967,371.96 634,527.47 70°19'7.661 N 148°54'33.95 W' 1,307.70 14.79 114.43 1,297.07 -18.49 118.59 5,967,371.19 634,529.27 70°19'7.653 N 148°54'33.90 W Start 2000.00 hold at 1307.70 MD , 1,400.00 14.79 114.43 1,386.31 -28.23 140.04 5,967,361.83 634,550.88 70°19'7.557 N 148°54'33.28 W 1,500.00 14.79 114.43 1,483.00 -38.79 163.27 5,967,351.70 634,574.30 70°19'7.454 N 148°54'32.60 W 1,600.00 14.79 114.43 1,579.69 -49.34 186.51 5,967,341.56 634,597.72 70°19'7.350 N 148°54'31.92 W 1,700.00 14.79 114.43 1,676.38 -59.90 209.75 5,967,331.43 634,621.14 70°19'7.246 N 148°54'31.24 W 1,777.18 14.79 114.43 1,751.00 -68.04 227.68 5,967,323.60 634,639.22 70°19'7.166 N 148°54'30.72 W SV6 1,800.00 14.79 114.43 1,773.07 -70.45 232.98 5,967,321.29 634,644.56 70°19'7.142 N 148°54'30.56 W 1,900.00 14.79 114.43 1,869.76 -81.01 256.22 5,967,311.15 634,667.98 70°19'7.038 N 148°54'29.89 W , 2,000.00 14.79 114.43 1,966.44 -91.56 279.45 5,967,301.02 634,691.40 70°19'6.935 N 148°54'29.21 W 2,077.11 14.79 114.43 2,041.00 -99.70 297.37 5,967,293.20 634,709.46 70°19'6.854 N 148°54'28.68 W BPRF 2,100.00 14.79 114.43 2,063.13 -102.11 302.69 5,967,290.88 634,714.82 70°19'6.831 N 148°54'28.53 W 2,200.00 14.79 114.43 2,159.82 -112.67 325.93 5,967,280.75 634,738.24 70°19'6.727 N 148°54'27.85 W 2,300.00 14.79 114.43 2,256.51 -123.22 349.16 5,967,270.61 634,761.66 70°19'6.623 N 148°54'27.17 W I 2,387.38 14.79 114.43 2,341.00 -132.44 369.47 5,967,261.76 634,782.12 70°19'6.532 N 148°54'26.58 W SV5 2,400.00 14.79 114.43 2,353.20 -133.78 372.40 5,967,260.48 634,785.08 70°19'6.519 N 148°54'26.50 W 2,500.00 14.79 114.43 2,449.89 -144.33 395.64 5,967,250.34 634,808.50 70°19'6.415 N 148°54'25.82 W 2,599.40 14.79 114.43 2,546.00 -154.82 418.73 5,967,240.27 634,831.78 70°19'6.312 N 148°54'25.14 W SV4 2,600.00 14.79 114.43 2,546.58 -154.88 418.87 5,967,240.21 634,831.92 70°19'6.312 N 148°54'25.14 W 2,700.00 14.79 114.43 2,643.26 -165.44 442.11 5,967,230.07 634,855.34 70°19'6.208 N 148°54'24.46 W 2,800.00 14.79 114.43 2,739.95 -175.99 465.34 5,967,219.93 634,878.76 70°19'6.104 N 148°54'23.78 W 2,900.00 14.79 114.43 2,836.64 -186.55 488.58 5,967,209.80 634,902.18 70°19'6.000 N 148°54'23.11 W 3,000.00 14.79 114.43 2,933.33 -197.10 511.82 5,967,199.66 634,925.60 70°19'5.896 N 148°54'22.43 W 3,055.51 14.79 114.43 2,987.00 -202.96 524.71 5,967,194.04 634,938.60 70°19'5.839 N 148°54'22.05 W SV3 3,100.00 14.79 114.43 3,030.02 -207.66 535.05 5,967,189.53 634,949.02 70°19'5.793 N 148°54'21.75 W 3,200.00 14.79 114.43 3,126.71 -218.21 558.29 5,967,179.39 634,972.44 70°19'5.689 N 148°54'21.07 W 8/12/2014 11:14:55AM Page 3 COMPASS 5000.1 Build 61 BP K AI 0 bp Planning Report-Geographic BAKER HUGHES Database: EDM R5K-Alaska PROD-ANCP1 Local Co-ordinate Reference: Well Plan N-28 Company: North America-ALASKA-BP TVD Reference: N-28 @ 91.00usft(Parker 272) Project: Prudhoe Bay MD Reference: N-28 @ 91.00usft(Parker 272) Site: PB N Pad North Reference: True Well: Plan N-28 Survey Calculation Method: Minimum Curvature Wellbore: Plan N-28 Design: N-28 Plan 9 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-5 +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude ` 3,225.64 14.79 114.43 3,151.50 -220.92 564.25 5,967,176.79 634,978.44 70°19'5.662 N 148°54'20.90 W 9 5/8" 3,276.84 14.79 114.43 3,201.00 -226.32 576.14 5,967,171.60 634,990.43 70°19'5.609 N 148°54'20.55 W SV2 3,300.00 14.79 114.43 3,223.40 -228.76 581.53 5,967,169.26 634,995.86 70°19'5.585 N 148°54'20.39 W 3,307.70 14.79 114.43 3,230.84 -229.58 583.31 5,967,168.48 634,997.66 70°19'5.577 N 148°54'20.34 W Start DLS 3.00 TFO 25.58 3,400.00 17.32 118.45 3,319.54 -241.00 606.13 5,967,157.47 635,020.67 70°19'5.465 N 148°54'19.68 W 3,500.00 20.14 121.67 3,414.23 -257.13 633.88 5,967,141.83 635,048.70 70°19'5.306 N 148°54'18.87 W 3,582.41 22.50 123.74 3,491.00 -273.34 659.07 5,967,126.08 635,074.18 70°19'5.147 N 148°54'18.13 W SV1 3,600.00 23.00 124.13 3,507.22 -277.14 664.71 5,967,122.39 635,079.89 70°19'5.109 N 148°54'17.97 W 3,700.00 25.89 126.06 3,598.25 -300.96 698.54 5,967,099.18 635,114.14 70°19'4.875 N 148°54'16.98 W ' 3,800.00 28.81 127.63 3,687.06 -328.53 735.28 5,967,072.27 635,151.36 70°19'4.604 N 148°54'15.91 W 3,900.00 31.73 128.94 3,773.42 -359.77 774.82 5,967,041.74 635,191.45 70°19'4.296 N 148°54'14.75 W 4,000.00 34.67 130.04 3,857.09 -394.61 817.06 5,967,007.67 635,234.30 70°19'3.954 N 148°54'13.52 W 4,041.55 35.89 130.46 3,891.00 -410.12 835.37 5,966,992.49 635,252.89 70°19'3.801 N 148°54'12.99 W UG4 i 4,100.00 37.62 131.00 3,937.83 -432.94 861.88 5,966,970.15 635,279.80 70°19'3.577 N 148°54'12.21 W 1 4,200.00 40.57 131.83 4,015.43 -474.66 909.16 5,966,929.29 635,327.81 70°19'3.166 N 148°54'10.83 W 4,255.11 42.20 132.24 4,056.78 -499.06 936.22 5,966,905.38 635,355.30 70°19'2.926 N 148°54'10.04 W Start Turn 0.00 4,300.00 42.20 132.24 4,090.03 -519.33 958.54 5,966,885.51 635,377.98 70°19'2.727 N 148°54'9.39 W 4,400.00 42.20 132.24 4,164.11 -564.49 1,008.27 5,966,841.25 635,428.51 70°19'2.283 N 148°54'7.94 W 4,470.05 42.20 132.24 4,216.00 -596.12 1,043.10 5,966,810.25 635,463.90 70°19'1.972 N 148°54'6.93 W UG3 4,500.00 42.20 132.24 4,238.19 -609.65 1,058.00 5,966,796.99 635,479.03 70°19'1.838 N 148°54'6.49 W � 4,600.00 42.20 132.24 4,312.26 -654.81 1,107.73 5,966,752.73 635,529.56 70°19'1.394 N 148°54'5.04 W 4,700.00 42.20 132.24 4,386.34 -699.97 1,157.45 5,966,708.47 635,580.08 70°19'0.950 N 148°54'3.59 W 4,800.00 42.20 132.24 4,460.42 -745.14 1,207.18 5,966,664.21 635,630.61 70°19'0.506 N 148°54'2.14 W 4,900.00 42.20 132.24 4,534.50 -790.30 1,256.91 5,966,619.95 635,681.13 70°19'0.062 N 148°54'0.69 W 5,000.00 42.20 132.24 4,608.58 -835.46 1,306.64 5,966,575.69 635,731.66 70°18'59.617 N 148°53'59.24 W 5,077.52 42.20 132.24 4,666.00 -870.47 1,345.19 5,966,541.38 635,770.82 70°18'59.273 N 148°53'58.11 W UG1 5,100.00 42.20 132.24 4,682.65 -880.62 1,356.37 5,966,531.43 635,782.18 70°18'59.173 N 148°53'57.79 W 5,200.00 42.20 132.24 4,756.73 -925.78 1,406.09 5,966,487.17 635,832.71 70°18'58.729 N 148°53'56.34 W 5,300.00 42.20 132.24 4,830.81 -970.94 1,455.82 5,966,442.91 635,883.23 70°18'58.285 N 148°53'54.89 W 5,400.00 42.20 132.24 4,904.89 -1,016.11 1,505.55 5,966,398.65 635,933.76 70°18'57.840 N 148°53'53.44 W 5,500.00 42.20 132.24 4,978.96 -1,061.27 1,555.28 5,966,354.39 635,984.28 70°18'57.396 N 148°53'51.99 W 5,600.00 42.20 132.24 5,053.04 -1,106.43 1,605.01 5,966,310.13 636,034.81 70°18'56.952 N 148°53'50.53 W 5,700.00 42.20 132.24 5,127.12 -1,151.59 1,654.74 5,966,265.87 636,085.33 70°18'56.507 N 148°53'49.08 W 5,792.98 42.20 132.24 5,196.00 -1,193.58 1,700.97 5,966,224.71 636,132.31 70°18'56.094 N 148°53'47.74 W WS2 5,800.00 42.20 132.24 5,201.20 -1,196.75 1,704.46 5,966,221.61 636,135.86 70°18'56.063 N 148°53'47.63 W 5,900.00 42.20 132.24 5,275.28 -1,241.91 1,754.19 5,966,177.35 636,186.38 70°18'55.619 N 148°53'46.18 W 6,000.00 42.20 132.24 5,349.35 -1,287.08 1,803.92 5,966,133.08 636,236.91 70°18'55.175 N 148°53'44.73 W 6,042.72 42.20 132.24 5,381.00 -1,306.37 1,825.16 5,966,114.18 636,258.49 70°18'54.985 N 148°53'44.11 W' WS1 6,100.00 42.20 132.24 5,423.43 -1,332.24 1,853.65 5,966,088.82 636,287.43 70°18'54.730 N 148°53'43.28 W 6,200.00 42.20 132.24 5,497.51 -1,377.40 1,903.38 5,966,044.56 636,337.96 70°18'54.286 N 148°53'41.83 W 6,272.21 42.20 132.24 5,551.00 -1,410.01 1,939.28 5,966,012.60 636,374.44 70°18'53.965 N 148°53'40.78 W CM3 6,300.00 42.20 132.24 5,571.59 -1,422.56 1,953.10 5,966,000.30 636,388.48 70°18'53.842 N 148°53'40.38 W 8/12/2014 11:14:55AM Page 4 COMPASS 5000.1 Build 61 BP 'S.111 0 bp Planning Report-Geographic BAKER HUGHES Database: EDM R5K-Alaska PROD-ANCP1 Local Co-ordinate Reference: Well Plan N-28 Company: North America-ALASKA-BP TVD Reference: N-28 @ 91.00usft(Parker 272) Project: Prudhoe Bay MD Reference: N-28 @ 91.00usft(Parker 272) Site: PB N Pad North Reference: True Well: Plan N-28 Survey Calculation Method: Minimum Curvature Wellbore: Plan N-28 Design: N-28 Plan 9 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 6,400.00 42.20 132.24 5,645.67 -1,467.72 2,002.83 5,965,956.04 636,439.01 70°18'53.397 N 148°53'38.93 W 6,500.00 42.20 132.24 5,719.74 -1,512.88 2,052.56 5,965,911.78 636,489.53 70°18'52.953 N 148°53'37.48 W 6,600.00 42.20 132.24 5,793.82 -1,558.05 2,102.29 5,965,867.52 636,540.06 70°18'52.509 N 148°53'36.03 W 6,700.00 42.20 132.24 5,867.90 -1,603.21 2,152.02 5,965,823.26 636,590.58 70°18'52.065 N 148°53'34.58 W 6,800.00 42.20 132.24 5,941.98 -1,648.37 2,201.75 5,965,779.00 636,641.11 70°18'51.620 N 148°53'33.13 W' 6,900.00 42.20 132.24 6,016.05 -1,693.53 2,251.47 5,965,734.74 636,691.63 70°18'51.176 N 148°53'31.68 W 6,947.00 42.20 132.24 6,050.87 -1,714.76 2,274.85 5,965,713.94 636,715.38 70°18'50.967 N 148°53'31.00 W Start DLS 3.00 TFO 144.39 7,000.00 40.92 133.66 6,090.53 -1,738.71 2,300.58 5,965,690.45 636,741.54 70°18'50.732 N 148°53'30.25 W !I 7,100.00 38.55 136.53 6,167.43 -1,783.94 2,345.72 5,965,646.04 636,787.47 70°18'50.287 N 148°53'28.93 W 7,200.00 36.25 139.72 6,246.88 -1,829.12 2,386.28 5,965,601.60 636,828.83 70°18'49.842 N 148°53'27.75 W 7,300.00 34.05 143.26 6,328.64 -1,874.12 2,422.15 5,965,557.25 636,865.50 70°18'49.399 N 148°53'26.70 W 7,392.32 32.12 146.90 6,406.00 -1,915.41 2,451.02 5,965,516.49 636,895.10 70°18'48.993 N 148°53'25.86 W CM2 7,400.00 31.97 147.22 6,412.51 -1,918.83 2,453.24 5,965,513.11 636,897.38 70°18'48.960 N 148°53'25.79 W 7,497.41 30.07 151.53 6,496.00 -1,961.97 2,478.83 5,965,470.44 636,923.74 70°18'48.535 N 148°53'25.05 W CM1 7,500.00 30.02 151.65 6,498.24 -1,963.11 2,479.45 5,965,469.31 636,924.38 70°18'48.524 N 148°53'25.03 W 7,600.00 28.24 156.62 6,585.60 -2,006.84 2,500.72 5,965,425.97 636,946.43 70°18'48.094 N 148°53'24.41 W 7,700.00 26.65 162.15 6,674.36 -2,049.92 2,516.99 5,965,383.19 636,963.46 70°18'47.670 N 148°53'23.94 W'. 7,800.00 25.31 168.28 6,764.27 -2,092.21 2,528.21 5,965,341.11 636,975.43 70°18'47.254 N 148°53'23.61 W 7,826.50 25.00 170.00 6,788.25 -2,103.27 2,530.33 5,965,330.09 636,977.76 70°18'47.145 N 148°53'23.55 W Start 2100.00 hold at 7826.50 MD 7,851.60 25.00 170.00 6,811.00 -2,113.71 2,532.17 5,965,319.68 636,979.78 70°18'47.043 N 148°53'23.49 W THRZ 7,900.00 25.00 170.00 6,854.87 -2,133.86 2,535.72 5,965,299.61 636,983.70 70°18'46.845 N 148°53'23.39 W 8,000.00 25.00 170.00 6,945.50 -2,175.48 2,543.06 5,965,258.13 636,991.78 70°18'46.435 N 148°53'23.18 W 8,100.00 25.00 170.00 7,036.13 -2,217.10 2,550.40 5,965,216.65 636,999.86 70°18'46.026 N 148°53'22.96 W 8,116.41 25.00 170.00 7,051.00 -2,223.93 2,551.61 5,965,209.84 637,001.19 70°18'45.959 N 148°53'22.93 W BHRZ 8,123.03 25.00 170.00 7,057.00 -2,226.68 2,552.09 5,965,207.10 637,001.72 70°18'45.932 N 148°53'22.91 W LCU 8,200.00 25.00 170.00 7,126.76 -2,258.72 2,557.74 5,965,175.17 637,007.94 70°18'45.616 N 148°53'22.75 W 8,300.00 25.00 170.00 7,217.39 -2,300.34 2,565.08 5,965,133.69 637,016.02 70°18'45.207 N 148°53'22.54 W 8,308.40 25.00 170.00 7,225.00 -2,303.83 2,565.69 5,965,130.21 637,016.70 70°18'45.173 N 148°53'22.52 W TJH 8,332.67 25.00 170.00 7,247.00 -2,313.94 2,567.48 5,965,120.14 637,018.66 70°18'45.073 N 148°53'22.47 W TJG i 8,400.00 25.00 170.00 7,308.02 -2,341.96 2,572.42 5,965,092.21 637,024.11 70°18'44.798 N 148°53'22.32 W 8,500.00 25.00 170.00 7,398.65 -2,383.58 2,579.76 5,965,050.74 637,032.19 70°18'44.388 N 148°53'22.11 W 8,600.00 25.00 170.00 7,489.28 -2,425.20 2,587.09 5,965,009.26 637,040.27 70°18'43.979 N 148°53'21.89 W 8,685.75 25.00 170.00 7,567.00 -2,460.89 2,593.39 5,964,973.69 637,047.20 70°18'43.628 N 148°53'21.71 W TJF 8,700.00 25.00 170.00 7,579.91 -2,466.82 2,594.43 5,964,967.78 637,048.35 70°18'43.570 N 148°53'21.68 W 8,800.00 25.00 170.00 7,670.54 -2,508.44 2,601.77 5,964,926.30 637,056.43 70°18'43.160 N 148°53'21.47 W 8,865.60 25.00 170.00 7,730.00 -2,535.74 2,606.59 5,964,899.09 637,061.74 70°18'42.892 N 148°53'21.33 W TJE � 8,900.00 25.00 170.00 7,761.18 -2,550.06 2,609.11 5,964,884.82 637,064.52 70°18'42.751 N 148°53'21.25 W 9,000.00 25.00 170.00 7,851.81 -2,591.68 2,616.45 5,964,843.34 637,072.60 70°18'42.342 N 148°53'21.04 W 9,100.00 25.00 170.00 7,942.44 -2,633.30 2,623.79 5,964,801.87 637,080.68 70°18'41.932 N 148°53'20.83 W 9,113.86 25.00 170.00 7,955.00 -2,639.07 2,624.81 5,964,796.12 637,081.80 70°18'41.876 N 148°53'20.80 W TJD 9,200.00 25.00 170.00 8,033.07 -2,674.92 2,631.13 5,964,760.39 637,088.76 70°18'41.523 N 148°53'20.61 W 8/1212014 11:14:55AM Page 5 COMPASS 5000.1 Build 61 • BP• S FA II 0 bp Planning Report-Geographic BAKER HUGHES Database: EDM R5K-Alaska PROD-ANCP1 Local Co-ordinate Reference: Well Plan N-28 Company: North America-ALASKA-BP TVD Reference: N-28 @ 91.00usft(Parker 272) Project Prudhoe Bay MD Reference: N-28 @ 91.00usft(Parker 272) Site: PB N Pad North Reference: True Well: Plan N-28 Survey Calculation Method: Minimum Curvature Wellbore: Plan N-28 Design: N-28 Plan 9 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Fasting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,300.00 25.00 170.00 8,123.70 -2,716.54 2,638.47 5,964,718.91 637,096.85 70°18'41.114 N 148°53'20.40 W 9,400.00 25.00 170.00 8,214.33 -2,758.16 2,645.80 5,964,677.43 637,104.93 70°18'40.704 N 148°53'20.19 W 9,401.84 25.00 170.00 8,216.00 -2,758.92 2,645.94 5,964,676.67 637,105.08 70°18'40.697 N 148°53'20.18 W TJC 9,500.00 25.00 170.00 8,304.96 -2,799.78 2,653.14 5,964,635.95 637,113.01 70°18'40.295 N 148°53'19.97 W 9,546.39 25.00 170.00 8,347.00 -2,819.08 2,656.55 5,964,616.71 637,116.76 70°18'40.105 N 148°53'19.87 W TJB 9,600.00 25.00 170.00 8,395.59 -2,841.40 2,660.48 5,964,594.47 637,121.09 70°18'39.886 N 148°53'19.76 W 9,625.83 25.00 170.00 8,419.00 -2,852.15 2,662.38 5,964,583.76 637,123.18 70°18'39.780 N 148°53'19.70 W TJA 9,700.00 25.00 170.00 8,486.22 -2,883.02 2,667.82 5,964,553.00 637,129.17 70°18'39.476 N 148°53'19.54 W 9,727.34 25.00 170.00 8,511.00 -2,894.39 2,669.83 5,964,541.66 637,131.38 70°18'39.364 N 148°53'19.49 W TSGR • 9,733.41 25.00 170.00 8,516.50 -2,896.92 2,670.27 5,964,539.14 637,131.87 70°18'39.339 N 148°53'19.47 W 7" 9,765.96 25.00 170.00 8,546.00 -2,910.47 2,672.66 5,964,525.64 637,134.50 70°18'39.206 N 148°53'19.40 W TSHU 9,800.00 25.00 170.00 8,576.85 -2,924.64 2,675.16 5,964,511.52 637,137.26 70°18'39.067 N 148°53'19.33 W 9,859.75 25.00 170.00 8,631.00 -2,949.50 2,679.54 5,964,486.74 637,142.08 70°18'38.822 N 148°53'19.20 W TSAD 9,881.81 25.00 170.00 8,651.00 -2,958.69 2,681.16 5,964,477.58 637,143.87 70°18'38.732 N 148°53'19.16 W 45SB 9,900.00 25.00 170.00 8,667.48 -2,966.26 2,682.50 5,964,470.04 637,145.34 70°18'38.657 N 148°53'19.12 W 9,926.50 25.00 170.00 8,691.50 -2,977.28 2,684.44 5,964,459.05 637,147.48 70°18'38.549 N 148°53'19.06 W Start 524.10 hold at 9926.50 MD 9,981.12 25.00 170.00 8,741.00 -3,000.02 2,688.45 5,964,436.39 637,151.89 70°18'38.325 N 148°53'18.94 W 42SB 10,000.00 25.00 170.00 8,758.11 -3,007.87 2,689.84 5,964,428.56 637,153.42 70°18'38.248 N 148°53'18.90 W 10,052.84 25.00 170.00 8,806.00 -3,029.87 2,693.71 5,964,406.64 637,157.69 70°18'38.032 N 148°53'18.79 W TCGL 10,100.00 25.00 170.00 8,848.75 -3,049.49 2,697.17 5,964,387.08 637,161.50 70°18'37.839 N 148°53'18.69 W 10,113.52 25.00 170.00 8,861.00 -3,055.12 2,698.17 5,964,381.47 637,162.60 70°18'37.783 N 148°53'18.66 W PGOC 10,135.59 25.00 170.00 8,881.00 -3,064.31 2,699.79 5,964,372.32 637,164.38 70°18'37.693 N 148°53'18.61 W BCGL 10,174.21 25.00 170.00 8,916.00 -3,080.38 2,702.62 5,964,356.30 637,167.50 70°18'37.535 N 148°53'18.53 W POWC 10,196.28 25.00 170.00 8,936.00 -3,089.56 2,704.24 5,964,347.15 637,169.28 70°18'37.445 N 148°53'18.48 W' 23SB 10,200.00 25.00 170.00 8,939.38 -3,091.11 2,704.51 5,964,345.60 637,169.58 70°18'37.429 N 148°53'18.48 W 10,251.44 25.00 170.00 8,986.00 -3,112.53 2,708.29 5,964,324.27 637,173.74 70°18'37.219 N 148°53'18.37 W 22TS 10,300.00 25.00 170.00 9,030.01 -3,132.73 2,711.85 5,964,304.13 637,177.67 70°18'37.020 N 148°53'18.26 W 10,317.65 25.00 170.00 9,046.00 -3,140.08 2,713.15 5,964,296.81 637,179.09 70°18'36.948 N 148°53'18.23 W 21TS 10,325.37 25.00 170.00 9,053.00 -3,143.29 2,713.71 5,964,293.60 637,179.72 70°18'36.916 N 148°53'18.21 W MHO 10,400.00 25.00 170.00 9,120.64 -3,174.35 2,719.19 5,964,262.65 637,185.75 70°18'36.611 N 148°53'18.05 W 10,403.71 25.00 170.00 9,124.00 -3,175.90 2,719.46 5,964,261.11 637,186.05 70°18'36.596 N 148°53'18.04 W TZ1 B 10,450.05 25.00 170.00 9,166.00 -3,195.19 2,722.86 5,964,241.89 637,189.79 70°18'36.406 N 148°53'17.94 W 41/2"TD 8/12/2014 11:14:55AM Page 6 COMPASS 5000.1 Build 61 ,.. BP Fa kW x « L)) Planning Report-Geographic BAKER HUGHES Database: EDM R5K-Alaska PROD-ANCP1 Local Co-ordinate Reference: Well Plan N-28 Company: North America-ALASKA-BP TVD Reference: N-28 @ 91.00usft(Parker 272) Project: Prudhoe Bay MD Reference: N-28 @ 91.00usft(Parker 272) Site: PB N Pad North Reference: True Well: Plan N-28 Survey Calculation Method: Minimum Curvature Wellbore: Plan N-28 Design: N-28 Plan 9 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude - 10,450.60 25.00 170.00 9,166.50 . -3,195.41 , 2,722.90 5,964,241.66 637,189.84 70°18'36.404 N 148°53'17.94 W TD at 10450.60-4 1/2" Design Targets Target Name -hit/miss target Dip Angle Dip Dir. TVD +N/-S +E/-W Northing Easting -Shape (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude N-28 Tgt1 0.00 0.00 8,516.00 -2,915.30 2,628.06 5,964,520.00 637,090.00 70°18'39.159 N 148°53'20.70 W -plan misses target center by 45.86usft at 9737.51 usft MD(8520.22 TVD,-2898.63 N,2670.57 E) -Point N-28 GeoPoly 0.00 0.00 8,691.00 -2,976.37 2,686.98 5,964,460.00 637,150.00 70°18'38.558 N 148°53'18.99 W -plan misses target center by 2.67usft at 9925.85usft MD(8690.91 TVD,-2977.02 N,2684.39 E) -Circle(radius 250.00) N-28 Tgt2 0.00 0.00 9,166.00 -3,139.05 2,834.11 5,964,300.00 637,300.00 70°18'36.958 N 148°53'14.70 W -plan misses target center by 123.67usft at 10434.85usft MD(9152.22 TVD,-3188.86 N,2721.75 E) -Point Casing Points Measured Vertical Casing Hole I Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 3,225.64 3,151.50 9 5/8" 9.625 12.250 9,733.41 8,516.50 7" 7.000 8.750 10,450.60 9,166.50 4 1/2" 4.500 6.125 8/12/2014 11:14:55AM Page 7 COMPASS 5000.1 Build 61 I 0 • BP Ida-III l bp Planning Report-Geographic BAKER HUGHES Database: EDM R5K-Alaska PROD-ANCP1 Local Co-ordinate Reference: Well Plan N-28 Company: North America-ALASKA-BP TVD Reference: N-28 @ 91.00usft(Parker 272) Project: Prudhoe Bay MD Reference: N-28 @ 91.00usft(Parker 272) Site: PB N Pad North Reference: True Well: Plan N-28 Survey Calculation Method: Minimum Curvature Wellbore: Plan N-28 Design: N-28 Plan 9 Formations Measured Vertical Dip Depth Depth Dip Direction (usft) (usft) Name Lithology (°) (1 461.02 461.00 G1 1,777.18 1,751.00 SV6 2,077.11 2,041.00 BPRF 2,387.38 2,341.00 SV5 2,599.40 2,546.00 SV4 3,055.51 2,987.00 SV3 3,276.84 3,201.00 SV2 3,582.41 3,491.00 SV1 4,041.55 3,891.00 UG4 4,470.05 4,216.00 UG3 5,077.52 4,666.00 UG1 5,792.98 5,196.00 WS2 6,042.72 5,381.00 WS1 6,272.21 5,551.00 CM3 7,392.32 6,406.00 CM2 7,497.41 6,496.00 CM1 I 7,851.60 6,811.00 THRZ 8,116.41 7,051.00 BHRZ 8,123.03 7,057.00 LCU 8,308.40 7,225.00 TJH 8,332.67 7,247.00 TJG 8,685.75 7,567.00 TJF 8,865.60 7,730.00 TJE I 9,113.86 7,955.00 TJD 9,401.84 8,216.00 TJC ' I 9,546.39 8,347.00 TJB 9,625.83 8,419.00 TJA 9,727.34 8,511.00 TSGR 9,765.96 8,546.00 TSHU 9,859.75 8,631.00 TSAD 9,881.81 8,651.00 45SB 9,981.12 8,741.00 42SB 10,052.84 8,806.00 TCGL 10,113.52 8,861.00 PGOC 10,135.59 8,881.00 BCGL 10,174.21 8,916.00 POWC 10,196.28 8,936.00 23SB 10,251.44 8,986.00 22TS 10,317.65 9,046.00 21TS 10,325.37 9,053.00 MHO 10,403.71 9,124.00 TZ1B 10,450.05 9,166.00 4 1/2"TD 8/12/2014 11:14:55AM Page 8 COMPASS 5000.1 Build 61 I BP S 4. Obp Planning Report-Geographic BAKER HUGHES Database: EDM R5K-Alaska PROD-ANCP1 Local Co-ordinate Reference: Well Plan N-28 Company: North America-ALASKA-BP TVD Reference: N-28 @ 91.00usft(Parker 272) Project: Prudhoe Bay MD Reference: N-28 @ 91.00usft(Parker 272) Site: PB N Pad North Reference: True Well: Plan N-28 Survey Calculation Method: Minimum Curvature Wellbore: Plan N-28 Design: N-28 Plan 9 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (usft) (usft) (usft) (usft) Comment 307.70 307.70 0.00 0.00 Start Build 1.00 607.70 607.56 0.00 7.85 Start Build 2.00 957.70 955.10 0.00 47.45 Start DLS 2.00 TFO 60.00 1,307.70 1,297.07 -18.49 118.59 Start 2000.00 hold at 1307.70 MD 3,307.70 3,230.84 -229.58 583.31 Start DLS 3.00 TFO 25.58 4,255.11 4,056.78 -499.06 936.22 Start Turn 0.00 6,947.00 6,050.87 -1,714.76 2,274.85 Start DLS 3.00 TFO 144.39 7,826.50 6,788.25 -2,103.27 2,530.33 Start 2100.00 hold at 7826.50 MD 9,926.50 8,691.50 -2,977.28 2,684.44 Start 524.10 hold at 9926.50 MD 10,450.60 9,166.50 -3,195.42 2,722.90 TD at 10450.60 8/12/2014 11:14:55AM Page 9 COMPASS 5000.1 Build 61 0 0 Qbp North America - ALASKA - BP Prudhoe Bay PB N Pad Plan N-28 Plan N-28 N-28 Plan 9 Anticollision Summary Report 12 August, 2014 rail BAKER HUGHES • M BP Fail bp Anticollision Report BAKER (4) " HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well Plan N-28 Project: Prudhoe Bay TVD Reference: N-28 @ 91.00usft(Parker 272) Reference Site: PB N Pad MD Reference: N-28 @ 91.00usft(Parker 272) Site Error: 0.00usft North Reference: True Reference Well: Plan N-28 Survey Calculation Method: Minimum Curvature • Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore Plan N-28 Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: N-28 Plan 9 Offset TVD Reference: Offset Datum Reference N-28 Plan 9 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,240.35usft Error Surface: Elliptical Conic Survey Tool Program Date 8/12/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 47.10 820.00 N-28 Plan 9(Plan N-28) GYD-GC-SS Gyrodata gyro single shots 820.00 2,320.00 N-28 Plan 9(Plan N-28) MWD MWD-Standard 820.00 3,226.00 N-28 Plan 9(Plan N-28) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 3,226.00 4,726.00 N-28 Plan 9(Plan N-28) MWD MWD-Standard 3,226.00 9,733.00 N-28 Plan 9(Plan N-28) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 9,733.00 10,450.60 N-28 Plan 9(Plan N-28) MWD MWD-Standard 9,733.00 10,450.60 N-28 Plan 9(Plan N-28) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB N Pad N-01-N-01-N-01 628.62 600.00 33.06 15.39 17.67 Pass-Major Risk N-01-N-01A-N-01A 641.77 625.00 33.17 15.48 17.69 Pass-Major Risk N-02-N-02-N-02 826.68 800.00 131.33 16.07 115.26 Pass-Major Risk N-03-N-03-N-03 948.90 925.00 215.72 16.03 199.71 Pass-Major Risk N-12-N-12-N-12 1,423.05 1,400.00 345.99 26.46 319.57 Pass-Major Risk N-13-N-13-N-13 761.43 750.00 230.97 12.27 218.70 Pass-Major Risk N-14-N-14-N-14 711.46 700.00 125.09 14.19 110.91 Pass-Major Risk N-14-N-14A-N-14A 715.63 700.00 125.15 14.23 110.92 Pass-Major Risk N-14-N-14B-N-14B 715.63 700.00 125.15 14.23 110.92 Pass-Major Risk N-14-N-14BPB1-N-14BPB1 715.63 700.00 125.15 14.23 110.92 Pass-Major Risk N-21-N-21A-N-21A 10,152.63 13,305.74 772.77 • 236.80 545.50 Pass-Major Risk N-22-N-22-N-22 9,229.17 9,025.00 698.59 • 174.30 552.49 Pass-Major Risk N-22-N-22A-N-22A 9,229.17 9,025.00 698.59 • 174.20 552.60 Pass-Major Risk N-22-N-22B-N-22B 2,297.05 2,250.00 750.77 44.27 706.58 Pass-Major Risk N-24-N-24-N-24 889.83 875.00 100.97 16.23 84.75 Pass-Major Risk 8/12/2014 12:01:38PM Page 2 of 3 COMPASS 5000.1 Build 61 • BP •• Fa Anticollision Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well Plan N-28 Project: Prudhoe Bay TVD Reference: N-28 @ 91.00usft(Parker 272) Reference Site: PB N Pad MD Reference: N-28 @ 91.00usft(Parker 272) Site Error: 0.00usft North Reference: True Reference Well: Plan N-28 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore Plan N-28 Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: N-28 Plan 9 Offset TVD Reference: Offset Datum Reference Depths are relative to N-28 @ 91.00usft(Parker 272) Coordinates are relative to Plan N-28 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927(Exact solution),Alaska Zone 04 Central Meridian is 150°0'0.00 W° Grid Convergence at Surface is:1.03° Ladder Plot 1200- - --1 II , O I rt C if,� fr.11'7 r in __ - lei 900- i1`,al o is . .. , ,i PO') i .l'-I► I :f.,.. : ' i C -_ - 1 4,-.-.':'''' `U�,*( ___J_ ___ J I (6 1 �/�/ I 1 ... !Z i I��� %, I 1 °' 600- I I 4) i d/®.�,:iftI I 407 0 nix,- 300- ifir- U .*.1 ,A. �r'wic. 1 49.4 __ J__ .. _. _I si.. 0 I I I I 0 2000 4000 6000 8000 10000 12000 Measured Depth(2000 usft/in) LEGEND N-01,N-01,N-01 V1 N-14,N-14,N-14 V4 N-22,N-22A,N-22A V5 N-01,N-01A,N-01A V4 N-14,N-14A,N-14A V1 N-22,N-22B,N-22B V10 -a- N-02,N-02,N-02 V1 N-14,N-14B,N-14B V2 -. .- N-24,N-24,N-24 V1 N-03,N-03,N-03 V1 N-14,N-14BPB1,N-14BPB1 V4 $ N-28 Plan 9 N-12,N-12,N-12 V1 N-21,N-21 A,N-21 A V2 $ N-13,N-13,N-13 V1 N-22,N-22,N-22 V7 8/12/2014 12:01:38PM Page 3 of 3 COMPASS 5000.1 Build 61 6 I- -1 I T§ 10 ANN < ____ U U Z ,z en CD 22 8'68m4N a sz ■® 1 8888 8888=8 ® I1 N Q �NCVBMOth8O T off C.')O J j J S N _ 2 m m 0"0H0N u.- _T_-___ OQ > mmmmmmm O. =h- 8."' N N N N C (� N N a¢Q � � � N W 8^ Q fn fn fn p(pn VJ pH Z 2 f Z ZZ2 00 N./, 1-r--,--,---,-- 8' �1�I�f� O1��t0 0 13 13 IS 130.0. 0 0,0 0 0 0 o a a a a a a a $ 4 go �88� h.�3Sol§S F � of c = S c c ® e p --___000a{f�1� Z m m m m ap N Np 0. 0 �' '18^M m1p���pO�p�Nr pNp8� a ± JL f fC l',1 ` -- rI ± f7-m"cc�1OO,.= N 1-50SOSm.D N �„ � �mvID lDmrn NNNNmi F1gg3 ^ Eo 555858 Z LL r ▪ mm §-$-8 mem 8 wow q I ' r oz, N ° I NN n N v W• 01 9O ' 8 O Zi p a . N L.'? m n(uiAlsn 00£) (+)uuoNy(-)ulnos 1 1D O w 3� O Ori I.; W co Z v -.-t-._ - ,7 , i!—'1 re O Z 20 � I g a a m G ��gD c G a T j R , . o r Ep amom g. m o §D so Ci — - N I r m T C J p 01 01 JN 0)880�8 O O IO O NN C N(4 mry-000 m a ° (n OO IA OO nOCV I`CO -_v00 Or __ --_—-- -�_�Qj (� L a Z Z N O > mm u��NCN�J < __ Of tl U 'OZ N.Z U O8O :_ F- . .... ..0. S I - 11111 ,9 , 2m__D g8888ggo oo8 H aaaaa aZ L,8 c, 8 ' - ^� L p�3o 8c ��� �o8oSgSS8S800 8 I-- o._. _ a 31 = v 0 O 0-CV CN 0 C7 0 C7 0 0 F. 0'-' ^ M 3z ~ _ ' ¢ 882'4CO .p.4 -.. 9. __�_`� __ �sn II --. .N El_ Zco �(OOiBpR 4$ y O O I�V Oco mD I•J Cr Ch N '' ', 01 Q N ,o O N N N W 8 0, U L. o o go� 1 O z c?8888 88 g-' N� N N I gig Z0000 _(�]�� - . T_ - On - O W4 O F CIpO .-ONNpp Cpp? CO i 0 O pO IlJ c'pOH(pppM 1m'&3p4 l lA O --__ C O Ch d'C7COO,,,--2,8.s2-. NmOO,8T I ,-7-, - IVl N m O O pp p p pp p m a � .288p pOpOC V NN 8O8 N _8O8O,�NNOOO __._- .__._-.- 8OOC")O���KNNN �- N 0 0 `1."'"'O ‘i'o0, 0O444OO8 8p O �mS� Kv. `rn �Nc �IO CO,CDO c.'•- 1 D V N t C N 00 . CAIti Cl) 0 O 8'I--- Cl ,_ NR .g , s E.1F 88 g _ N rn VI , .O F.: r a O. (u!iusn oc9) g3dou Ieo►1aoA mu", IN W A® 11, — 1. � a ►gym= r 1111111r ,INSW MI hg 0 1,I+ � I ■■ � I � $ g I■ ■ ■ ■ ' w co _i g , N o a rs VIZ-N/IZ.N z �gl'g E 11111111111111. _■ milFg S F 1 III w4 25 OB��. • 4` E. 1■ .s ®■ Io° _ A ° r Z °° Al p:iiiiii a n Pr , ec 7 °,o Q o Z o �_-txliir °Oso I I I= F 8 o° b", ,,, ir_. .1,8 III8 tOr S a % I ►� III ° /°z i 7 y _ 8 64 1 g . t, 000.-S ",'-, 4fe ' gini E Eim qa I 5� r 6� o s \V 4' o-i — oes AO Z co 0 Aig 1 h 8 .911 ..b-y.� M ■■ u I — a — 8 1 ..., sr. 111E11 ci hillir:' 1 $' ,1 _,____ME a, a • 1 1 II8,,.'ff.e 8 1 ,, ,., S.. Al _ T__ ____ moil 1111111111h5 R - ME § .. a F�� 8� $ X17. a va _ 1•. ' I a 1— t i ■ ■ I ■■_ i I ' 111 ■■■■■ ■ ■ i 11111 1 + - _ ■ ■■ ■■■= 1 ■■ 1 ■ ®E.�®_1 EE a •.-•._p p N to to ,n 0 (u►/gsn 006 (+)guo1N/(-)tonos z 0 • NI m ,,,_ \■,x ., r „ Oa ill 0 g . z . zthrz..22zz.zz sZ 188888828288k'2 0 ;:12 2 2 2 2'2 0008880000,E „,130 2R48 a,�o Nm q $ N p N 0 z 0o oeN8mm C -2''''T- 8,`-'8, 69.. Y_ .vm 1IooSo^ogmmNe�4 -��r�ro om� i `RSA mm�� _ . o N000 o �� O m € '888:1-7,%:',4,9-P-',`-'-' n O // oo N000 ,/m < E<`U1 <NNN / CD Q" ',2), Ems'ell \ ° Zg Eg 4.6 gUserri i o 4444 OS S.E°G•° m�WCQI i�{o�ro�i t� / �"w. / \ psi p_mm<emrm :�d � Www, c yyyy110 Ln o o Ln a O In o In o O a) cc, ��,aico ' !/ / c ! ! ! !o c8 8 z � o z 0 c E '4. 000 0 O -0� Z m oCO § a U Hll O N N O In -N g _ \ 2'4(3E_ J v o Dce= /i o � a.,1.2 p o� W 0z "L v. o CV o / / ,- \- \\,\,\ i _ co co / / \ \N i 7 / inm mNN e pp _ Nv m co, i•ri N ¢ u- u_z r+ gam 9 .--14 0 o + oacz \ I 000oozc am 1�I > v, ., 1 l W ,2,-92M�aaa ' /_ .,......e..% co ''•,1-."_.:1411:1«.,', / \. "fib Z c a C n \\ ,.! `f � ; / , i 1`� g� � t (1 NN nNNNN a �m oN .+ *S 4 / :. ss ' / O a mmmmmzz ca w P old Z . ° 'z `t "_ / i i Z � I aaaaaaa q c5 N O .��{+A15..+? �\l 'EN' \ ,i.,, .,i,,,,,,.....4 ,,,''-'„,„, ,,,,,,,- 2_,,,,% 0, C-...- - , / E 1 g 2°.'`'..Tc'O'c 'o' list � Ad N w c6 ZNNmmmmN Z ,` ,:. _' ;.1 -__\_ �� 'sem c, '� 7C v mzzzzzzz 5oocotovloo ce'pspi,j N 3 `tt - % �;� CE I N =00000..00, P. .-C,INCVNMulul .Q 0 =E� o_ 1 t�- __L_._� ' `'' Q 0 Om N M YOriOO Z ? y�s�.+aa�� �. _ �iW ''3 00000000 zz -__ Q `ti5{� y��� __ 0000 ma + ��: Y - N • e- -- „_ - o ES) 6 5 T-11 1 2 0 r - '--i._ -- DI ___w 19© !Y' Q ie° _ , „R N 'AD r _ J IIIIIIIIr ID 1 '71-103'l PROJECT ''' 1 P1± \ �' l 1 1_ _, , -1 ..N s :. NPAD - __ _______ , _2 18:,.. 17 26: _-_ -,_-' VICINITY MAP IN-30 I 1- 111 N.T.S. 236 I I ° _II 0 4° 1itr 3° 1.1 SI I 2N OF •1qI 4e ,�+ '\ nma•, E •1 4 4CI I - N-29 4..7c." m 4m.4 10,, ,, j 74 1 -I ICo ._�.- - i • 40Tuf\ 4. 14 II *k ti ( .. .. . am.mme...mc.0 m 4/0 zz 13° ♦ AI 120 �.a• ... }- mmanmmm.m mm A I m LEGEND: I c•,e Richar' F. Allison o. . I 10: + AS-BUILT i 4 0608 2911 I ° EXISTING CONDUCTOR �I. p ,•. m�P I 9° 14444 Iowa- 0, .$" I I NOTES: I %%% % 221 1. ALASKA STATE PLANE COORDINATES ARE ZONE - - GEODETIC COORDINATES ARE NAD27. • SURVEYOR'S CERTIFICATE ' -a - -- -' I HEREBY CERTIFY THAT I AM 2. HORIZONTAL AND VERTICAL CONTROL ARE PROPERLY REGISTERED AND LICENSED BASED ON N PAD OPERATOR MONUMENTS N-1 TO PRACTICE LAND SURVEYING IN GRAPHIC SCALE AND N-2. THE STATE OF ALASKA AND THAT 250 500 1000 3. ELEVATIONS ARE BP EXPLORATION MEAN SEA THIS AS-BUILT REPRESENTS A SURVEY LEVEL DATUM. MADE BY ME OR UNDER MY DIRECT - 4. MEAN PAD SCALE FACTOR IS: 0.9999206 SUPERVISION AND THAT ALL ( IN FEET ) 5. DATE OF SURVEY: AUGUST 05, 2014. DIMENSIONS AND OTHER DETAILS ARE 1 inch = 500 ft. 6. REFERENCE FIELD BOOK: NS14-47, PGs. 02-09. CORRECT AS OF AUGUST 05, 2014. LOCATED WITHIN PROTRACTED SEC. 8, T. 11 N., R. 13 E., UMIAT MERIDIAN, ALASKA WELL A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) BOX ELEV. OFFSETS Y=5,967,387.55 N 1969.70 70'19'07.835" 70.3188431' 1,483' FSL • N-28 X= 634,410.37 E 1000.14 148'54'37.361" 148.9103782' 43.9' ' 4,728' FEL N-29 Y=5,968,358.56 N 2940.80 70'19'17.383" 70.3214954' 43.9' 2,454' FSL X= 634,414.67 E 1001.65 148'54'36.729" 148.9102024' 4,703' FEL N-30 Y=5,968,087.24 N 2669.45 70'19'14.716" 70.3207543' 43.7' 2,183' FSL X= 634,412.16 E 999.92 148'54'36.944" 148.9102621' 4,712' FEL ORANN, CSS: ,*♦ I CHECKED: .�.._._..• Ta i1'�... - --- . __ _ ,� .�W =- by �.�_.._....._.........._..�.... .....v.a._ _.�_ DAM �.ft�y a 9/09/14 r+• I._..� _ DRANING: __. _.-.... ......._-__ _�....._...._ .T ..._. beH _ FRB14 WON oa _ WOA - N PAD SHEET _ _ ... .. J06 NO SCALE: .--... AS-BUILT CONDUCTOR LOCATION 1 OF 1 DG 8/09/14 ISSUED FOR INFORMATION CSS JZW 1"=500' WELL N-28, N-29, & N-30 NO. DATE REVISION BY CNN I , , . --, , ,,-,, _ , ,.., ..... _. f - L- ...._ , _ .1 i 29 111I 1 On\L\JM ,,,,./."1 26 IF 1 . . ,' )t- - '11 / i � I II 8 = I 0 I I II I Irk 'I `-6 Illi Ii 11 .ii` . I ■ I 5 1 I iii _A a i N-28 Diverter 1 3 ' 1 Layout for 1 II y f z . I 24 Es I1 Parker 272 1 IIS I 28 1 22° Bend I I I 4 I, , W ...__, 13 all 1 CC/ ) I I : : : I cl -CP Tza 11 "" ` I I ■ I • II 9■ I II I I I I) ..."____0.4II -� L ', 138' ' 1 _ � ' - ` _ r - - tt • 0 t 7 C I/ 6-5000 77. i ..,..._ ______ 1 1 1 /O '� O / 4 "6-5Ci',DO VOD 120 GV C 1 Ail a 11 \O 0/ a T , N( ; ), / 92.25 , 1 MINIM. 11011111 \ 4 V.6-5000 MOJ ,;'0 GV O�O . ; 6—,ono MOD 120 CV Acro 50. rTrr r r-7 141 .:€).N1 - ./16-5000 voD 120 Gv I \OO/ I 0 PRIVATE AND CONFIDENTIAL a_visior+s nFscR,PTiau �'OK WrIjIlEX AX0 ALL NI WOW,NIOXIAMED,-EAL,N APE I, � ann ,e-o�oa ��a«,�� - frACThchnologiel _- — �z .oe-m-as W/ 4 'i16 5000 WING DISIWI' ,. .00 oa-o-os ,T, n ,41 4 USI LA SALF 9Y 11.1,LVIDI+vm,.oxx� .„,E„� „,,.�,, A,T. oe-o._as )M'00023007 4 4 1/16-5000 (R-390 scssv =XIT s� 1111 MIMI 9iAa.. I I a4 '' 11 TEs Pot a.1� _;m— MO TEST '6R' it seam ;1 TI rummat 1— TCff/�} ®"ila WI ems®_ o LOCK 083 scRFws e 1, �I -115000 50 (R-5 ' 30K 5006 MOD 120 GV SCSSV EXIT 1�� 1 1®1 sit 11Eià —;IIil ■666. A _to _ � F6�° 1 ���l• n' '11 O1►Zi G --_ 13.1' 1467.61 1 1 533.25 1 6a X12 �� 10 LOCKDOWN SCREWS ' J 11-5000 .R 54) 1 ' �'�0 4p1 1®, (6) /16. 5030 MOD 20 GV 5 =i 57 85 ■IgfOy-`" II■ _ LII 11� I,isi 'I, • - 111 ■i, b $ II■ ■11 0401,4*' r 1, 11 9 5 • _..SLAW II'1 II 11II � if 1 _ r OM L'_ ) (6 e.-''''''''''''A IN MMPART HUMBER ll UESC2,M1 ION -.-_ — —- '13 300 030 3 HFRER L ANDING RING 2 '3832? 8005 14 52B CASING HANGER 3 415 720 TO S ' IN LANCIEIG RING ' 4IP1648 9 GAS NG HEAD ASSEMBL �_ 5 1,3-300 ,18 11 LLL N 5 TUBING 'HEAD ASSEMBLY )lr 5 k51232 57 0002 r _ ING HANGER ASHA : 20'21) CASING 7 12-G30-01b / PA FOF 5 ASSEMBLY 8 15150963 WRING MANGER ASSRMP Y 5 ING PTCR ® 228334-5005 93 14r 46uBL3 LT 21 HEAR ASING NAASFRMh Y /------- 9 5/8"OL CAS.NC 1. 1 P'. B 4 0 5 - _ / l 12 l 093---JIT L_ _21 CASING HANGER —.---- 1, 7'OD CASING 192 OD CASING �� �1 I � '✓ r A , L, A SNC.H(IT H 6, 6K 0 x 9 :/8 X / X 4 lit RLF:DV,C0042348 ti 00120M'080698 <9 PRIVATE AND CONFIDENTIALOTHERWISE SPECIE ED REV sloos D,sr.R.POoN 0 EGEERANGE A 1 03-09-1 ---- [.CTIC3ATION5 W �L,CAD OM t fMCna■aa9 O CD yrs,nrn A030 NAXINUM . ,.cs ! 20 X 9 5:8 X X 1 "1/ _---- DESIGN NEVI, oom.m,SHALL eANGLE ANGLE Es,ALS3 ADDIF 30 -_ _^'Cl COML'L {7 H� ..aHAM,, ---- PACER 'S ,H� ""' w„MON w x, 1Ns 'V - ON 0303 DUIO,D 0937oI_ 0 .4--:-. _ -I II ,, sI II 1 1 I i .mi II I i II 1 - El II II 1 . • _ 1 8uPERSEDE-D il II 1------41 II / II 7rJ -- 7i",: ..... -......, „..._. i i '----1-,--, _. ----- ,:. ..„., -.....,. I ,..E:3 C=1 % .:1 • - _. .... . I _ ___ . -,:..- ___.... -_ .-......,.....i.--- --.2 ---. —- ' ..... I II ,.,r — ik —— a 1 i] -,. 1 il '-,-.4 I ‘,,,,,, • :4111:111r,- li ,4 .,, . t, A rr` 7.=+.---_--=-':--- - 2 A• i I ' ' I I 1 i '--%. n li , 1 1 I I 0 ii I SUPEr' :Urel) \ i 1 II .., DED ..„--t. ., .4.,.. . t• . -----1/4_,-- 1 -- ..*...\,. ,,, ..--/ 47 / \ Parker 272 I , . I Well-28i I II 4 1 \sti 12— M 1 I 14i i i UI I l 511 i 1 f 1 1 3UPER I ...1 ,I • .. - ' 8-0 1 , rr ' . , r,"--.-—— - ,_ .„... .......... 0) r ; • 1— ' fte WELL PRODLCER 111 or CI WELL INJECTOR 41- :.,%-E. 'D C: D: 'D :C,'._2 - 1:: ",'.-', - 2•--7 :).2..../ N P\ WELL SLOT WICONDIJCTOR C3 - - , • 110 Ferguson, Victoria L (DOA) From: Rosenbaum,Jesse E <Jesse.Rosenbaum@bp.com> Sent: Tuesday, September 02, 2014 10:12 AM To: Ferguson, Victoria L(DOA) Subject: RE: PBU N-28(PTD 214-127) Production Packer Good Morning Victoria, The planned distance between the proposed production packer depth and top perf depth will be 420' MD ( 100' above LTP to zone 4 per Directional plan#5). Thanks, Jesse Rosenbaum From: Ferguson, Victoria L(DOA) [mailto:victoria.ferguson@ alaska.gov] Sent: Tuesday, September 02, 2014 10:06 AM To: Rosenbaum, Jesse E Subject: PBU N-28(PTD 214-127) Production Packer Jesse, What is the maximum distance you expect between the production packer and the top perforation? Thanx, Victoria Victoria Ferguson Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave,Ste 100 Anchorage,AK 99501 Work: (907)793-1247 victoria.ferquson a(�.alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Ferguson at(907)793-1247 or Victoria.Ferguson@alaska.gov 1 Ferguson, Victoria L (DOA) To: Rosenbaum, Jesse E Subject: RE: PBU N-28(PTD 214-127) Diverter Line Route Jesse, This looks much better- Thanx, Victoria Victoria Ferguson Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave,Ste 100 Anchorage,AK 99501 Work: (907)793-1247 victoria.ferquson a(�.alaska.00v CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Ferguson at(907)793-1247 or Victoria.Ferauson@alaska.gov From: Rosenbaum, Jesse E [mailto:Jesse.Rosenbaum(abp.com] Sent: Friday, August 29, 2014 7:32 AM To: Ferguson, Victoria L (DOA) Cc: Lastufka, Joseph N Subject: RE: PBU N-28(PTD 214-127) Diverter Line Route Good Morning Victoria, I have been in contact with operations and the superintendent has optimized the diverter layout after some analysis. This is layout I received yesterday.. Thank You, Jesse Rosenbaum Drilling Engineer I BP Exploration Alaska 0:907-564-5155 I C:406.533.8984 jesse.rosenbaumCo ibp.com From: Ferguson, Victoria L (DOA) [mailto:victoria.ferguson@alaska.gov] Sent: Thursday, August 28, 2014 11:20 AM 1 • To: Rosenbaum, Jesse E Subject: PBU N-28(PTD 214-127) Diverter Line Route Jesse, Please provide a close-up figure for the Parker 272 diverter line route. Thanx, Victoria Victoria Ferguson Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave,Ste 100 Anchorage,AK 99501 Work: (907)793-1247 victoria.ferquson analaska.cov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Ferguson at(907)793-1247 or Victoria.Ferauson@alaska.gov 2 O - -' 1 I c==t LL.:-.1 ' '-i. ;,.,. U , ,, , Li i I t" -11 1514 II 4,:cki, jTh ,......di , 1 ES2b II ,f• r - 111 -J. --'• -- . ) 27 a !I \- ! 301 ,1,,,,, , II '— 1 : II: 4 PA 1!! II IlII II t'l II II 6 II ..7 )ii - 13 C II \ta / ,b . i AI 1 -, 1N-28 Diverter -71rft Nii 1 .. II ° Layout for ,i; • . l''-• 24 1' -71 I Parker 272 .., 28 li— t 44 ' 14 R.,=.= 4.. 13 IN ! 14 . I j I I I / 12 $ I T120. i 11 s 1 i 1 V7).7. '3• lei i kt I I I '1:., L. • I _} —1211 I I I I 138 1 \'''' ''>\\., • ./ • • Davies, Stephen F (DOA) From: Rosenbaum,Jesse E <Jesse.Rosenbaum@bp.com> Sent: Monday,August 25, 2014 3:12 PM To: Davies, Stephen F (DOA) Cc: Staudinger, Garret Subject: RE: PBU N-28 (PTD#214-127): Questions Steve, My apologies on the delay I was out of town for Thursday and Friday last week.To answer your questions.... 1) The well will be injecting into zone 4, but the well will TD into zone 2. 2) This well will not be pre-produced it will go directly to injection. (If a fill cleanout is required, a service coil unit will be used). Let me know if this info is sufficient. Thanks, Jesse rosenbaum From: Davies, Stephen F (DOA) [mailto:steve.davies@alaska.gov] Sent: Monday, August 25, 2014 10:07 AM To: Rosenbaum, Jesse E Subject: FW: PBU N-28 (PTD # 214-127): Questions Jesse, When you have the time, if you can answer my questions, below, I can finish my review of the PBU N-28 Permit to Drill application. Thanks, Steve Davies Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission (AOGCC) Phone: 907-793-1224 AOGCC: 907-279-1433 Fax: 907-276-7542 333 West 7th Avenue,Suite 100 Anchorage,AK 99501 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it, and,so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov. 1 • From: Davies, Stephen F (DOA) Sent: Thursday, August 21, 2014 4:24 PM To: 'jesse.rosenbaum@bp.com' Subject: FW: PBU N-28 (PTD # 214-127): Questions Jesse, The Permit to Drill cover letter states that PBU N-28 will be an injector for Ivishak Zone 2, but the Planned Well Summary on the next page states the target objective is Zone 4. Which is correct? Will N-28 be pre-produced for 30 days or more, or will it be flowed back for a short time to clean the well bore? Regards, Steve Davies Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission (AOGCC) Phone: 907-793-1224 AOGCC: 907-279-1433 Fax: 907-276-7542 333 West 7th Avenue,Suite 100 Anchorage,AK 99501 CONFIDENTIALITY NOTICE: This e-mail message,including any attachments, contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.daviesPalaska.gov. 2 • • Davies, Stephen F (DOA) From: Davies, Stephen F (DOA) Sent: Thursday, August 21, 2014 4:24 PM To: 'jesse.rosenbaum@bp.com' Subject: FW: PBU N-28 (PTD#214-127): Questions Jesse, The Permit to Drill cover letter states that PBU N-28 will be an injector for Ivishak Zone 2, but the Planned Well Summary on the next page states the target objective is Zone 4. Which is correct? Will N-28 be pre-produced for 30 days or more, or will it be flowed back for a short time to clean the well bore? Regards, Steve Davies Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission (AOGCC) Phone: 907-793-1224 AOGCC: 907-279-1433 Fax: 907-276-7542 333 West 7th Avenue,Suite 100 Anchorage,AK 99501 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov. 1 • OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. • • TRANSMITTAL LETTER CHECKLIST WELL NAME: 40 , PTD: C� Development Service _Exploratory Stratigraphic Test Non-Conventional POOL: C, (Cee/ Check Box for Appropriate Letter/ Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI LATERAL The permit is for a new wellbore segment of existing well Permit (If last two digits No. , API No. 50- - - in API number are Production should continue to be reported as a function of the original between 60-69) API number stated above. In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name Pilot Hole ( PH) and API number (50- - - - ) from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce / inject is contingent upon issuance of a Spacing Exception conservation order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: Production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application,the following well logs are Well Lo ,n also required for this well: gg g Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 4/2014 • 11111) 0 N 0) o a) 0- co V) a) 5 ' O .o N c O, a) • Q M, 4 m, s O w 0, c co Q a >, O! co Q n Y u) of o a) p oo Q OS co a O. X. @. N 03 = CO ° 73 ea o Q p. c7 .5 Q. : C: o O. a < O 5 a). -o 3, 3, co c 9 co as c y, a CO 0_ z!, 0 0 o' o co a m o'o , amici 0 00i. co' c a) 3 0 w o, :� 0) o, 0 0 C3- r- m > oTo o , m a 3, CO, a a) .0 a) �, O c. G N,CD 73 '� N, c O, o. O O U a), _ O C o o g E: � o N, 0 o' Q, >, -N c F- d p O m m .3„ �, co N, c, O O w, O a), �, O, a, V �, (0. D o a 0 ) N N• Nz -6 0. O 0. of O (/), CT C13 C 0 co 03 ill —0 co W N O t0 CO. . Cij N. O. V) p, :• CO O, o O t o w m Z 3 a o0 `�, w 3, m' n I J n nj f 1 o N, — 0 N, a 00, in O 0. D .0 N: O. N, "O : TO t0 V 7• u co Ce F _o zCN C 3 3 v 3' N rn - a co 'c. >- N O .C., Q O. co 0 To _he C', (0, > a •d _ �� I 'N, N. N. V-) O Q m o, N co a 0, a, - 0 3 c . co a) 2 3. 3 3 m 3 >, a) c yr c 3CO m. o, -a. ai o w IX co as, Z co �, y, o ° co 0 a N, c ac) ac) E O O c 03 (N t0 0 CD O CO, O -O N, 0 i, N z p a) O O o Z cai o CON, v 0 .o CO �`o !� aoi; $' 3' ami' o o ', p O t0 CO O y a, �` p' TD ZI c C co cO a 2 co o n M p c_ 0) t,- o' 0_ N, p a; m. ao>i w co a U o a a O u) N F, 0 Q, Q L 2 g, 1 Q, Z, D. 0 0 a ctw (0U) U) O) Q) t/) N N 4) W U) N CO 0) (0 U) U) U). 4) t0 CO CO (0, U) W CO f0. W. U) 4) Q a) a) a) Cl) Cl) a) a) a) a) a) a) a) a) a) 0 Q a), a) a) 0, m a), a), Q, a), a), a), Cl), a), Cl), a) a) Cl), o, a), Q Q, Q; az >- >- >- >- >- >- >- >- >- >- >- >- >- z z >- >- >- Z >- >- >- Z >- >- >- >- >- >- >- >- >- z >- z. z z, 3' F o. • 0 (5— c To a) 0 3 E a) O O, U E N co It o pp_ — (n T n y ._ c a a E /in o ) 3 E, 3, o 0 p a) r) 0, o c CD 0 _' CO o �' o �', E, N, , o "2 R -o .2 t) 0.5 () coIli a) a) as c E — o a) 1t 0 't, E' a v, _ >, , E Q y 41 } 3 0 > 3 .o 0 0: c° o) 0 N', c ai o N 0 --' 30, Lt o co Q c 7 m @ 0 0 c, o a o 4 co CO, m U .c. O) ,2 i) as 7. 3. O. 0 �. Cr) .0 orS, C vU) co a O 1 D Q' CO CO co N 0) w Z, "O O' c' "O 0 a)' C' 'O OS ° p- D. O C a) m: O 0 0) a)' L' a cL:.4. p Q E E o c Cu) E, (0 m, > o (� c c ti > F y c, 04 0 ) c a) L a ° t a c c o co o 0 2' v o' @ m o o 0' Q o 0y c U' .Q a 0- • g o aS a ° .3. o > 6 Y Q Q OO O a) c >, O 3 7 „O a 0 (`, O Y CO O O O O• CO O E a7 (0 (0 Q (L6 -0 N >, O O O O 'N 0 0 m. - -0 0 0 a) c. O _ Z 0 ' E 3 a) o o -c m 3 v O. .. a Q... 2. d -o m C CO9, o. CO :: s -C a. 0) m -a 0 13 O c q O, a) c`, ._ a), c,, `00 co o a 3' o -c o .T 3, c E c m n n - N 3 3 m. `° a� E - .5 3 (0 ,D 0 a 0 N, m. 4 a) y' o. 3 a)' CO O o' w 0 O z .a -O.. C .Fi 2 a N -' O .� U O' c' T O O' •-" a O' 0 p t' Z' w, U ao p, o c = -o a m 0 0 o m 8 o co E o c o O o o c o o' co v' E' a8i' co E L o) o ami' a °' a' c F a). a .0 N Cl). d O T 7 a c V O' CO) a O .0+ :? - 1 a) 1- 0 "O m' E' 01 0 . (0' V 3 C O 0 ors Q L a a) a a a N: a U7, y, a _ O: a N OI N N' OS c O 3 N 'o, u), o, y' c, .c Cl) o o a m •N _ n co m co �o o m 0 .o `m c c a a aaoi N: > a) a). O a) 3 5 -o 0, " c cr cr `a). c, c co .n p a t % o 8 o' o o, 0, > o a) it 'J f0 .0 — 7, V V 0. - c N.. .0 -0 .0 -0 y. a)� •C `n' O: . a' O •.N :4, -C 3 N -0 O N E 0• O' ('), -° p 03 C, E wa a) m, m co ns a) 0 - m; 0 E os 3' 0' a) o cf.))' Cl) m "' 0' �; _ 0 c v co E c 0 a) N N c c' c 3 0 0 0 aci, 0 0 0 0 .0 m o u) o' c D o o - �0 a) 45 m � (n; n, E 3 a) 'E 0 2' (� v, CO) a ,--, O 0 O O O' .0 .0 t6 03 0. o N: 0 c O > > 3' 0 c N c 'a-) 0) w, w a) W' co 0- ' Cl), ai, a) J co E m a � m a`) a_ E' E'. c a) 3. aai c c Lt H � v,, aa)i a0 cr >_ .� a a o'. „`o', a �', E �, U co, c. ) U '' a a_) D � � � U) co- 0 0 0 co 0 ¢' a' Z 0 (1)1 0 0 0 co <; @; ¢' �' o m' m c0S 5', '�' 2' a 0' u) vi ce; W a ON M V' CO (O N- 00 0) 0 NCO V (0 (O Fr CO a) O NCO dr ,o co N 00 0) r I C ,- N CO V to co 1- co an ,— ,— < r• r- ,- a- l- N- N N N N N N N N N N CO CO CO CO M CO CO CO CO CO V U C� V 7 C 0 C (Si.: N '-'O 0 O CD O 0 ne r O CO N CO m.( N N C) N N 0 (D Ci. v ` 00 7.E (5) CO a) E J N w 0 co p E N C O O W Q I E Q O a) `00.. ; 5 0. U 0 S a Q Q w Q p Q