Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout214-153David Douglas Hilcorp North Slope, LLC Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt and return one copy of this transmittal. Received By: Date: Hilcorp North Slope, LLC Date: 06/27/2023 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL WELL: PBU L-01A PTD: 214-153 API: 50-029-23011-01-00 Ultrasonic Imager Tool (02/03/2015) SFTP Transfer - Data Folders: Please include current contact information if different from above. PTD: 214-153 T37782 Kayla Junke Digitally signed by Kayla Junke Date: 2023.06.27 14:19:53 -08'00' 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in thes pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU L-01A Conductor Cement Top Job Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 214-153 50-029-23011-01-00 341J ADL 0028238, 0028239 14730 Conductor Surface Intermediate Production Liner 9023 80 2655 10989 3861 14698 20" 9-5/8" 7" 4-1/2" 9020 49 - 129 48 - 2703 46 - 11034 10867 - 14728 3020 49 - 129 48 - 2558 46 - 8729 8592 - 9023 Unknown 470 3090 5410 7500 None 1490 5750 7240 8430 11341 - 14609 4-1/2" 12.6# 13Cr80 44 - 108748951 - 9015 Structural 4-1/2" HES TNT Perm Packer No SSSV Installed 10748, 8495 No SSSV Installed Date: Torin Roschinger Area Operations Manager Tyson Shriver Tyson.Shriver@hilcorp.com 907-564-5452 PRUDHOE BAY 7/7/2023 Current Pools: PRUDHOE OIL Proposed Pools: Prudhoe Oil Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 7:41 am, Jun 23, 2023 323-358 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.06.22 17:33:00 -08'00' Torin Roschinger (4662) SFD 8/3/2023MGR03AUG23 DSR-8/3/23 10-404 7/7/2023 GCW 08/03/2023JLC 8/4/2023 08/04/23 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.08.04 10:18:28 -08'00' RBDMS JSB 080823 Conductor Cement Top Job Sundry Well: L-01A PTD: 214-153 API: 50-029-23011-01-00 Well Name:L-01A Permit to Drill:214-153 Current Status:Under Evaluation API Number:50-029-23011-01 Estimated Start Date:July 7, 2023 Estimated Duration:7days Regulatory Contact:Abbie Barker First Call Engineer:Tyson Shriver (907) 564-4542 (O)(406) 690-6385 (M) Second Call Engineer:Oliver Sternicki (907) 564-4891 (O)(907) 360-6233 (M) Current Bottom Hole Pressure:3,900 psi @ 8,800’ TVD 8.5 ppg | offset wells Max Anticipated Surface Pressure:3,020 psi (Based on 0.1 psi/ft gas gradient) Last SI WHP:1,700 psi Min ID:3.813” @ 2,259’ MD X-nipple Max Angle:103 deg @ 11,978’ MD Brief Well Summary: L-01A was sidetracked in 2015 as a horizontal sliding sleeve and swell packer completion. The OA was cemented to surface as part of the sidetrack work scope. The OA exhibited re-pressurization although the gas samples from the IA and OA were dissimilar, indicating a shallow hydrate as the possible source of OA pressure. In November of 2016, the NOL (Normal Operating Limit) was raised to 1,600 psi and the well was made Operable. It produced for much of 2017 and did not require frequent bleeds to keep the OA pressure under NOL. In January of 2018 when the well was brought online, it exceeded NOL with an OA pressure of ~1,650 psi. The OA had to be bled multiple times over multiple days to keep the OA pressure below NOL. Gas samples from the IA and OA were taken again for analysis with the same dissimilar results. WellLock was squeezed into the OA May 2018 and was successful at sealing off the OA from repressurizing above NOL. The well continued to produce until February 2020, when it became uncompetitive. In preparation for planned well work, the L-01A was POP’d on 6/15/2023 for testing and evaluation. While bringing the well online, gas bubbling from the conductor was observed. The well was shut-in and LEL readings were found to be over limit. Objective: This procedure is to clean out the Conductor and top off the Conductor x 9-5/8” Annulus with cement to seal- off the gas bubbling from the conductor. Procedural Steps: Slickline – 1. Set tubing tail plug and CMIT-TxIA to 3,500 psi. 2. Pull tubing tail plug. DHD/Special Projects – 1. Hot water/surfactant/steam wash the Conductor x 9-5/8” Annulus to top of good cement. 2. Top off Conductor with cement. DHD – 1. POP well Under-Evaluation and monitor conductor/cellar for any bubbling/gas. Attachments – x Current Wellbore Schematic x Approved Sundry Change Form Gas samples from the IA and OA were taken again for analysis with the same dissimilar results.W indicating a shallow hydrate as the possible source of OA pressure. Conductor Cement Top Job Sundry Well: L-01A PTD: 214-153 API: 50-029-23011-01-00 Current Wellbore Schematic: Conductor Cement Top Job Sundry Well: L-01A PTD: 214-153 API: 50-029-23011-01-00 Approved Sundry Change Form: Changes to Approved Sundry Procedure Date: Subject: Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HAK Prepared By (Initials) HAK Approved By (Initials) AOGCC Written Approval Received (Person and Date) Approval: Operations Manager Date Prepared: Operations Engineer Date • • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Monday, February 19, 2018 3:19 PM To: AK, GWO Well Integrity Engineer;AK, OPS EOC Specialists;AK, OPS GC2 Facility OTL;AK, OPS GC2 Field O&M IL;AK, OPS GC2 OSM;AK, OPS GC2 Wellpad Lead;AK, OPS PCC Ops Lead;AK, OPS Prod Controllers;AK, OPS Well Pad LV;Ak, Ops West Area TL;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr; Peru, Cale; Regg,James B (DOA) Cc: AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, OPS FF Well Ops Comp Rep;AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael; Janowski, Carrie; Montgomery,Travis J; Munk, Corey;Obrigewitch, Beau;O'connor, Katherine; Romo, Louis A; Sternicki, Oliver R;Tempel,Joshua;Worthington, Aras J; Wallace, Chris D (DOA) Subject: NOT OPERABLE: Producer L-01 (PTD#2141530) Sustained outer annulus casing pressure not manageable All, Producer L-01(PTD#2141530)was made under evaluation on 1/22/18 for having sustained outer annulus casing pressure above NOL. Diagnostic work performed during the UE period does not indicate IAxOA communication, however the OA pressure did not stabilize and required numerous bleeds to maintain below NOL. At this time the well is reclassified as Not Operable and will remain shut in due to unmanageable OA repressurization while online. The engineering team is currently evaluating the well for an OA down squeeze repair. Please respond with any questions, Joshua Stephens Well Integrity Engineer Office: 907-659-8110 Cell: 907-341-9068 SCANNED WO .1.e•1 weft w-wa•w• From: AK, GWO Well In -; • Engineer Sent: Monday, January 22, 20 ; •40 PM To: AK, OPS EOC Specialists; AK, OPS - acility OTL; AK, OPS GC2 Field O&M TL; AK, OPS GC2 OSM; AK, OPS GC2 Wellpad Lead; AK, OPS PCC Ops Lead; AK, OP , •• Controllers; AK, OPS Well Pad LV; Ak, Ops West Area TL; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt , • Peru, Cale; 'Regg, James B (DOA) (jim.regg@alaska.gov)' Cc: AK, GWO Completions Well Integrity; AK, GWO DHD Well n -. ; AK, GWO Projects Well Integrity; AK, GWO SUPT Well Integrity; AK, GWO Well Integrity Well Information; AK, OPS FF e S•s Comp Rep; AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael; Janowski, Carrie; •- 'ornery,Travis J; Munk, Corey; 1 LOF Tfl4, • sA THE STA Alaska Oil and Gas OfALAsKA. Conservation Commission 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 OF ALAS A Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov gt SCANNED 2 s.) Aras Worthington Interventions and Integrity Engineer BP Exploration(Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe BayField, Prudhoe Bay _ Oil Pool, PBU L O l A Permit to Drill Number: 214-153 Sundry Number: 318-035 Dear Mr. Worthington: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, °,6k4i/ Cathy 16. Foerster Commissioner DATED this 14 day of February, 2018. R5'_:' "_S Lc FE3 -t52018 STATE OF ALASKA •LASKA OIL AND GAS CONSERVATION COMMI� JAN 1 y 201 APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ba6410" 1. Type of Request: Abandon 0 Plug Perforations ❑ Fracture Stimulate 0 Repair Well a. Suspend ❑ Perforate ❑ Other Stimulate 0 Pull Tubing 0 Change Approved Program 0 Plug for Redrill ❑ Perforate New Pool 0 Re-enter Susp Well 0 Alter Casing 0 Other OA WellLock Squeeze 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number 214-153 ` 3, Address: P.O.Box 196612 Anchorage,AK Exploratory 0 Development 0• 99519-6612 Stratigraphic 0 Service 0 6. API Number: 50-029-23011-01-00 ` 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes 0 No I2I PBU L-01A • 9. Property Designation(Lease Number): 10. Field/Pools: ADL 028239• ,4i c_. e72--e.3€ //:Z.t•i± PRUDHOE BAY,PRUDHOE OIL • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): 14730 • 9023 • 14698 • 9020 • None Unknown Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 49-129 49-129 1490 470 Surface 2655 9-5/8" 48-2703 48-2558 5750 3090 Intermediate 10989 7" 46-11034 46-8729 7240 5410 Production Liner 3861 4-1/2" 10867-14728 8593-9023 9020 8540 Perforation Depth MD(ft): Perforation Depth ND(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 11413-14558 8981-9010 4-1/2"12.6# 13Cr80 44-10874 Packers and SSSV Type: 4-1/2"HES TNT Perm Packer Packers and SSSV MD(ft)and ND(ft): 10748/8495 No SSSV Installed No SSSV Installed 12.Attachments: Proposal Summary El Wellbore Schematic 0 13.Well Class after proposed work: Detailed Operations Program 0 BOP Sketch 0 Exploratory 0 Stratigraphic 0 Development II- Service 0 14.Estimated Date for Commencing Operations: February 10,2018 15. Well Status after proposed work: Oil II ' WINJ 0 WDSPL 0 Suspended 0 16.Verbal Approval: Date: GAS 0 WAG 0 GSTOR 0 SPLUG ❑ Commission Representative: GINJ 0 Op Shutdown 0 Abandoned 0 17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Worthington,Aras J be deviated from without prior written approval. Contact Email: Aras.Worthingtonajbp.com Authorized Name: Worthington,Aras J Contact Phone: +1 907 564 4102 Authorized Title: Interventions&Integrity En ineer // /J Authorized Signature: 4—...A:7. Date: �/ /�� COMMISSION USE ONLY Conditions of approval:Notify Commission so that a representative may witness Sundry Number Plug Integrity 0 BOP Test 0 Mechanical Integrity Test 0 Location Clearance 0 3/B- 035 Other: Post Initial Injection MIT Req'd? Yes 0 No Spacing Exception Required? Yes 0 NoI Subsequent Form Required: //C = 4 et-~/--'-!- Approved Approved by (/ COMMISSIONERLAPPROVED ocation Cl YTHE Date: ORIGINAL RB , , E' Submit Form and Form 10-403 Revised 04/2017 Approved application is valid for 12 months from the date of approval. �/�Att chme.�nts in Duplicate Atte • oi • 10.0 Well: L-01 L-01 OA WeIlLock Squeeze Well Interventions Engineer: Aras Worthington (907) 440-7692 Pad Engineer: Cale Peru (907) 564-4522 Expected Start Date: February 10, 2018 History L-01A was sidetracked in 2015 as a horizontal sliding sleeve and swell packer completion. The OA was cemented to surface as part of the sidetrack work scope. The OA exhibited re- pressurization although the gas samples from the IA and OA were dissimilar, indicating a shallow hydrate as the possible source of OA pressure. In November of 2016 the NOL (Normal Operating Limit) was raised to 1600 psi and the well was made Operable. In January of 2018 the OA exceeded NOL with an OA pressure of 1650 psi and attempts to bleed the OA pressure below NOL were unsuccessful. Gas samples from the IA and OA were taken for analysis and a PPPOT-IC Passed to 3500 psi on 1/24/2018. Current Status The well is currently shut-in and will be classified as "Not-Operable" by BP. Objective Squeeze the cemented OA with Well Lock to seal off the OA re-pressurization. Procedure 1. ND OA Gate Valve, NU OA Integral. 2. Bleed Annuli, Prep OA, WeIlLock OA top job squeeze to 3000 psi per RPs. • • IFS= 4-1/16"OW SAFETY NOTES: WELL ANGLE>70°@ 11419'`"'MAX W LFEP D FMC L-0 1 A DLOGLEG:17.2°@ 11231' ""'4-1/2"CHROME TBG& ACTUATOR= BAKER C OKB.H-EV= 76.7' BF.ELEV= ,r1 '4" KOP= 1100' :14;..* '- 1021' -9-5/8'TAM PORT COLLAR Max Angle= 99°n 12072' -"CONDUCT ? ^4 ,i: Datum MD= 11246'-# :E. 2259' JH4-1/2'FES X POS,ID=3,813' Datum ND= 8800'SS!'' 13= 9-5/8"WI NOCK(01/19/15) --I2703' - 2569" (-7-FES ES CEMNTER 4. 9-5/8"CSG,40#,L-80 BTC,13=8.835" -2703' 2567' H 7"BKR ISO-ZONE ECP,D=6.270" 9-5/8'BKR RSV(01/19115) - -2724' I MILLOUT WINDOW(L-01A) 2703'-2720' 1 Minimum ID =3.813" @ 2259' I 1 GAS LET MANDRELS 4-1/2" HES X NIPPLE ST MD ND DEV TYPE VLV LATCH PORT DATE 7 3077 2838 44 KBG-2 DONE BK 16 04/19/16 6 4069 3465 52 KBG-2 DMY BK 0 02/19/15 5 5763 4505 52 KBG-2 DONE BK 16 04/19/16 TOP OF C MENT - -4900' lir4 7169 5507 28 KBG-2 DOME BK 16 03/16/16 914 3 8326 6510 35 KBG-2 SO BK 22 03/16/16 's 0 2 9483 7458 35 KBG-2 DM( BK 0 03/16/16 ~ A 1 10639 8405 35 KBG-2 DMY BK 0 02/19/15 10717' -14-1/2"FES X NfP,D=3.813' ►.t ►�4 0 10748' 7"X 4-1/7 FES TNT PKR.D=3.856" i. ' 10785' -14-1/2'FES X NPD, =3.813" V'1 10857' -14-1/2.HES X NP,D=3.813" FISFT 1"DOME GLV FROM STA#7(04/19/16) -1 ? I -406 10867' -T X 5'BKR FIDE ZXP LTP w/11'TIEBACK TOP OF 4-1/7 LNR - 10867' SLV,13=4.350' 4-112'TBG,12.6#,13CR-85 VAM TOP, H 10874' ' 10874' --14-1/7 WLEG,D=3.958" .0152 bpf,D=3.958" LI .414 -(ELMO TT NOT LOGGED C 11 7"CSG,26#,L-80 VAM TOP HC/BTC-M, H 11034' cr, 4 10891' ---i'X 5"BKR OG FLEXLOCK t-GR,D=4.30" _0383 bpf,D=6.276' 10901' J 5-1/2"X 4-1/2"XO,D=3.958" 4-1/2" WATER SWELL PACKERS ME_ " 4-1/2"SUCING SLV,ID=3.813" STATUS BORAX •= = NO DEPTH O/C DATE MIN D TOP SP JONT SWELL FKR LOG 10/07/15 - 23J 8 11413 0 04/20/15 3.813' NO STLE DEPTHMNLENGTH J ENGLAND .... .. ID - 7 11591 0 04/2005 3.813' 9 4-1/2" 11304 3.958" 16' ? - I. 6 12150 0 04/20/15 3.813' 8 4-1/2" 11482 3.958" 16' FAILED i• El 5 12372 0 04/20115 3.813" 7 4-1/2' 11685 3.958" 16' ? = 4 13106 0 04/20/15 3.813" 6 4-1/2" 11983 3.958" 16' FAILED ••• 3 13681 0 04/20/15 3.813" 5 4-1/7 12623 3.958" 30' HOLDING -.- 2 14258 0 04/20/15 3,813' 4 4-1/2" 12879 3.958" 30' FAILED 11. 1 14558 0 04/20/15 3.813" 3 4-1/7 13852 3.958' 16' HOLDING _ 1. 0=OPEN C=CLOS® 2 4-1/7 14390 3.958' 16' HOLDING 1 4-1/7 14612 3.958" 16' FAILED _ 20 r-+ 14676' -{4-1/2"BKR SI-AFT TOOL VERIFICATION SUB,D=3.91" 4-1/2"LNR,12.6#,13CR-85 HYD 521,- 14728' 14698' -4-1/2'BKR ISOLATION VALVE,D=1.00" .0152bpf,D=3.958' 'AL1 DATE REV BY COMMENTS DATE REV BY COMMENTS FRUDFfOEBAY UNIT 07/01101 CWKAK ORIGINAL COMPLETION 10/13/15 AY/JMD UPDATED S1NEi-L FKR TABLE _ WELL: L-01A 02/19115 PKR 272 SIDETRACK(L-01A) 11/24/15 KB/JMD UPDATED SWELL FKR TABLE PHUT No: '2141530 02/24/15 JMD DRLG HO CORRECTIONS 12/11/15 JLS/JMD GLV CIO(12/07/15) AR No 50-029-23011-01 02/25/15 TJ/J14) FINAL ODE APPROVAL 03/17/16 CJMJMD GLV C/O(03/16/16) SEC 34,T12N,R11E,2392'NSL&3659'WEL 04/07/15 JMIMM) GLV C/O(04/03/15) 04/25/16 TBD/JMD GLV CIO&FISH(04/19/16) 04/22/15 CJS/JMD OPBNE])SLD SLVS(04/20/15) BP Exploration(Alaska) 2 • • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Monday,January 22, 2018 2:40 PM To: AK, OPS EOC Specialists;AK, OPS GC2 Facility OTL;AK, OPS GC2 Field O&M IL;AK, OPS GC2 OSM;AK, OPS GC2 Wellpad Lead;AK, OPS PCC Ops Lead;AK, OPS Prod Controllers;AK, OPS Well Pad LV;Ak, Ops West Area IL;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr; Peru, Cale; Regg,James B (DOA) Cc: AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, GWO Well Integrity Well Information; AK, OPS FF Well Ops Comp Rep;AKIMS App User;Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael;Janowski, Carrie; Montgomery, Travis J; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Romo, Louis A; Sternicki, Oliver R; Tempel,Joshua;Worthington,Aras J;Wallace, Chris D (DOA) Subject: UNDER EVALUATION: Producer L-01 (PTD#2141530) Sustained outer annulus casing pressure above NOL All, Producer L-01(PTD#2141530)was reported to have sustained outer annulus casing pressure above the revised NOL of 1,600psi. The pressures were confirmed to be T/1/0= 320/1550/1650psi. Attempts to bleed the annulus below 1,650psi failed. At this time the well is reclassified as Under Evaluation and is on the 28 day clock for diagnostics and repairs. Plan Forward: 1. DHD—Obtain IA and OA gas samples 2. Wellhead—PPPOT-IC 3. Wells Engineer—Evaluate for OA downsqueeze 4. Well Integrity Engineer—Additional diagnostics as needed. Please respond with any questions, Joshua Stephens Well Integrity Engineer Office: 907-659-8110 Cell: 907-341-9068 SCANNED yi wo 1 • Wallace, Chris D (DOA) From: AK, GWO SUPT Well Integrity <AKDCWellIntegrityCoordinator@bp.com> Sent: Sunday, October 02, 2016 4:32 PM To: AK, OPS GC2 OSM;AK, OPS GC2 Field O&M TL;AK, OPS GC2 Wellpad Lead;AK, OPS Prod Controllers;AK, OPS EOC Specialists;Cismoski, Doug A; Daniel, Ryan;AK, RES GPB West Wells Opt Engr;AK, RES GPB East Wells Opt Engr;AK, OPS PCC Ops Lead; Peru, Cale;AK, OPS WELL PAD W; Regg,James B (DOA) Cc: AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO Completions Well Integrity;AK, GWO SUPT Well Integrity;AK, OPS FF Well Ops Comp Rep; Hibbert, Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey; Obrigewitch, Beau; Pettus,Whitney; Sternicki, Oliver R;Tempel,Troy;Worthington,Aras J;Wallace, Chris D (DOA) Subject: NOT OPERABLE: Producer L-01A(PTD#2141530) Sustained OA Casing Pressure above Normal Operating Limit (formerly MOASP) All, Producer L-01A(PTD#2141530)was reclassified Under Evaluation on 09/04/16 due to sustained outer annulus casing pressure above Normal Operating Limit(NOL).The OA is cemented nearly to surface. Repressurization of the small void at the top of the OA has recurred since the annulus was cemented during a rotary sidetrack in February 2015.At this time,the repressurization is not manageable by bleeds. Diagnostics indicate that the most likely source is a shallow gas hydrate zone.The OA pressure stabilizes between 1000- 1200 psi. L-01A is a candidate for a revised (increased) OA NOL,and this option will likely be pursued.Once the BPXA internal process is completed,AOGCC approval will be sought prior to revising the NOL. The well is reclassified as Not Operable while the NOL revision is progressed. Thanks, Adrienne McVey Well Integrity Superintendent—GWO Alaska (Alternate:Jack Lau) 0:(907)659-5102 sapid s�) FEB 1 all C:(907)943-0296 H:2376 Email: AKDCWellintegritvCoordinator@BP.com From: AK, G Y• - Well Integrity Sent: Sunday, September • 116 5:24 PM To: AK, OPS GC2 OSM; AK, OPS GC '- • O&M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, RES GPB West We • Engr; AK, RES GPB East Wells Opt Engr; AK, OPS PCC Ops Lead; Peru, Cale; AK, OPS WELL PAD W; 'Regg, James B (D. ;'m.regg@alaska.gov)' (jim.regg@alaska.gov) Cc: AK, GWO DHD Well Integrity; AK, GWO Projects Well Integ •; GWO Completions Well Integrity; AK, GWO SUPT Well Integrity; AK, OPS FF Well Ops Comp Rep; 'chris.wallace@alaska.go is.wallace@alaska.gov); Hibbert, Michael; Janowski, Carrie; Montgomery,Travis J; Munk, Corey; Obrigewitch, Beau; Pettus, v se ; Sternicki, Oliver R; Tempel, Troy; Worthington, Aras J Subject: UNDER EVALUATION: Producer L-01A (PTD #2141530) Sustained OA Casing Pressure a•. - MOASP All, 1 • S Wallace, Chris D (DOA) From: AK, GWO SUPT Well Integrity <AKDCWellIntegrityCoordinator@bp.com> Sent: Sunday, September 04, 2016 5:24 PM To: AK, OPS GC2 OSM;AK, OPS GC2 Field O&M IL;AK, OPS GC2 Wellpad Lead;AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan;AK, RES GPB West Wells Opt Engr;AK, RES GPB East Wells Opt Engr;AK, OPS PCC Ops Lead; Peru, Cale;AK, OPS WELL PAD W; Regg,James B (DOA) Cc: AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO Completions Well Integrity;AK, GWO SUPT Well Integrity;AK, OPS FF Well Ops Comp Rep;Wallace, Chris D (DOA); Hibbert, Michael;Janowski, Carrie; Montgomery,Travis J; Munk,Corey; Obrigewitch, Beau; Pettus,Whitney; Sternicki, Oliver R;Tempel, Troy;Worthington,Aras J Subject: UNDER EVALUATION: Producer L-01A(PTD#2141530) Sustained OA Casing Pressure above MOASP Attachments: Producer L-01A(PTD#2141530)TIO Plot 2016-09-04.docx All, Producer L-01A(PTD#2141530)was reported with sustained OA casing pressure above MOASP on 09/01/16. Pressures were confirmed to be TBG/IA/OA=300/1580/1060 psi.The well is reclassified as Under Evaluation for further diagnostics. Plan Forward: 1. Downhole Diagnostics: OA Repressurization Test 2. Well Integrity Engineer:Additional diagnostics as needed A copy of the TIO plot is attached for reference. Please reply if in conflict with proposed plan. Thanks, Adrienne McVey `���E� JAM 2 �� ( Well Integrity Superintendent—GWO Alaska (Alternate:Jack Lau) 0:(907)659-5102 C:(907)943-0296 H:2376 Email: AKDCWelllntegrityCoordinatorCa BP.com From: , .; Well Integrity Coordinator Sent: Tuesday, Ma : 016 4:39 PM To: AK, OPS GC2 OSM; AK, • • Field 0&M IL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, GWO SUPT S i •-• AK, GWO SUPT Special Projects; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS PCC Ops Le.•, rton, Kaity; AK, OPS WELL PAD W Cc: AK, GWO DHD Well Integrity; AK, GWO Projects Well In • AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Sayers,Jessica; Dickerman, Eric; Pettus, Whitney; Munk, Corey; Oso ristine; Morrison, Spencer; McVey, Adrienne Subject: OPERABLE: Producer L-01A(PTD #2141530)TIFL Passed All, 1 2co14 C� NOV 2itt°I BAKER NT DISTRIBUTION LIST HIL HES .°"4 Please sign and return one copy of this transmittal form to: COMPANY BP Exploration Alaska Inc BP Exploration (Alaska) Inc. (mandatory) Petrotechnical Data Center, LR2-1DATA L9GGED WELL NAME L-01A 900 E. Benson Blvd. �t�Z�2o15 K.BENDER (mandatory) Anchorage, Alaska 99508 FIELD Prudhoe Bay Unit to acknowledge receipt of this data. (mandatory) COUNTY North Slope Borough LOG TYPE RPM-Wireline (mandatory) (mandatory) STATE Alaska BH DISTRICT Alaska (mandatory) (mandatory) LOG DATE: October 8,2015 TODAYS DATE: 22-Nov-15 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: CANIZARES EMAIL: (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? No COMPANY PRINTS ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX PERSON ATTENTION U ' U U U U U 1 ConocoPhillips Alaska Inc. 1 1 Attn:Ricky Elgaricio ATO 3-344 700 G Street Anchorage,AK 99510 2 ExxonMobil,Alaska 1 I 1 Attn:Lynda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr.Suite 600 Anchorage,AK 99503 3 State of Alaska-AOGCC 1 1 Attn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 4 DNR-Division of Oil&Gas 0 I 1 I I Attn:Sean Clifton 550 West 7th Avenue,Suite 802 Anchorage,Alaska 99501 5 I I I I SUNNED JUN 1 5 2016 TOTALS FOR THIS PAGE: 3 4 1 1 0 • 21 41 53 ( .77-4 --- WELL LOG TRANSMITTAL 26448 PROACTIVE DIAGNOSTIC SERVICES INC. DATA LOGGED tt /12/2015 M.K. BENDER To: AOGCC Makana Bender 333 W. 7th Ave Suite 100 ►""J ( 0 2015— Anchorage, Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and /or Tubing Inspection(Caliper/MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of : BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Analisa Steger LR2— 1 900 Benson Blvd. Anchorage, AK 99508 aancpdc@bp.con1_ and ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245-8952 1) PPROF-MAPS 06-Oct-15 L-01A BL/CD 50-029-23011-01 2) Signed : � � � Date : Print Name: PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-8952 E-MAIL: PDSANCHORAGE@MEMORYLOG.COM WEBSITE:WWW.MEMORYLOG.COM D:\Achives\MasterTemplateFiles\Templates\Distribution\TransmittalSheets\BP_Transmit.docx • • Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. Q1LJ - 4 53 Well History File Identifier Organizing (done) Two-sided ❑ Rescan Needed 7RESC N: OVERSIZED: NOTES: Color Items: ❑ Maps: 'yscale Items: s: ❑ Poor Quality Originals: ❑ Other: ❑ Other: f/ p BY: Date: I /5 /s/ 1 Project Proofing yv1 BY: 011=6 Date: I C`� I 15 /s/ Scanning Preparation if x 30 = 00 +rgs- = TOTAL PAGES 1 5 BY: ` aria Date: l a I , (Count does not include cover sheet) ç4/j/s/ �/ Production Scanning Stage 1 Page Count from Scanned File: 114 (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: 1/ YES NO BY: MO Date: l a / / ii I15 t , vy6 /'J Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Stage 2 Additional Well Reports: YES 0 TOTAL PAGES: Digital version appended by: Meredith Michal Date: /s/ Final Page Count: Stage 1 + Stage 2: TOTAL PAGES: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: /s/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc • • o o e o c0 0 N c o a) •0 0 • 2 2 a) 0 0 of) 0 0 O 'O O t t _ ✓ \ Z Z a o cm• Z \> c O Ou) 0 0 0uNia) in in A N '(p 5 5 •T• D (I) O)d U) U) (I) N N N N i N co U N 2 ? a) a) a) Cl) Cl) a) Cl) Cl) a) Cl) p N Cl) '< Q N .0 0 0 0 0 0 0 0 O 0,� 0 y o > CO o o m (7 N Z Z 2Q 'E .(1) Z v_> Z u, Z m .Z U) 'Et Z cn co 6 a) ''I ) a) 6 a) ❑ Zop z zo zog o zo zo Zo Zo Zo ZJ z .m Z Z E m E n O❑ O mm O❑ O❑ O❑ O o O o O o O o Ow O ri. i)c ? ❑ c) c) i • • o • x p p 0 o pcn 9 • • 2 a) 2 2 2 • x 0 .c v M Z ca c c � C C-0 C Ca c X 0 • '0 Q L N (N 0) N U).0 U) LO a U) U) 0) U) > > a) > y O) O a) o a) o a) a) 0 O a) a 0 a) a) N 0 U co O CV - 0 0 0 0 0 UJ UU U j 3 N C - -a o U T U VN N No a 0 a).� a) ° a)a a) a) 0 a)4- a) co m >, 'io cn 2 cn-o cn&) cn co too N cn g to-o o m o 2 2 a a a c n ii . n c Z � Z • Zz3 zZ z -0 zCD T Z 0ii p wDz OO o Ow O a) 0_-8 O a) O o w cn o aTo U J C U ucon.F n J U) v) w c j >- Q > U > -O > p > 2 > o >-0 > U _-OQ < w LL it (n m Q w Q 0 Q .• Q 'O Q NQCI-cpQ Q Q D Q Q Q Q Q Q -0 V w O N OO 22 O-OO O ON O O O O O O O O J (p a) J V J 0 Jc JJ J N J J J J J J I O i • ioua - • -0taaaaai c a 8 ai ai ai aahi aaD Z Q O it it c w 111 ILII LLp Li:it LL it 67 it LLCe o U U U u) O y 0 O-0 U O U-p 0 0 0 0 0 a a) C C C a w- Eco C c co c C c 0. C C x C C C O E N O O co 2°-a O a O@ O O O O-0 2 2 X 2 2 2 p E cc W U p U p U p U p U i) 8 U p U p U c U U- 0 U U Q O N co> au> a)Q o a)Q a) ) as a, a)> a)> a) o) a) a) 2 a) W a) w 0 IX Ca F- di F- w2J w� w0 wa a] F- di F- w'�n w ED q= w CO w cam= O/� " ` Z in cn to cn in cn cn cn « a CL O U O 5 5 O O 5 5 5 5 O O O O O E N E W N N N N N N N N N N N N N N ca 7 O) _� �_ 07 �_ m m �_ O lA (A Z Ce O M Cr) M M M M M M M M M M M M W w v. 9- Q. - °- Q- O. 4 v -J a) U m oa) Za) < CZ RU) O o 3 a a I CL • (n 1 o O (n 20 O N -a E M V Q 0I 030 r 1 c) o � Q J P. I— a m O a `n O m — ("n 5� = G N /y� Q a) W m N c O ID .9 co o U Q = C CC 0 a) < E ' G Z d U 1 c E c z U) m m as m m as a) m a) co co m m a) `m 3 ,U) (0 co co f0 U) (0 m is co m U) as co V M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a) c) c o i o m m m m .o m m m m m m m m 2 C oo ) ) o) o) o) 0) a) o) o) o) o) a) a) a) o is p p p p p p p p p ° ° ° ° ° J E p co G ; o w LO Un in to ic) Ln to to n S n T in to to n c > r ~ in U) U) U) In U) U) to co U) U) U) U) U) U) - w U) co U) U) U) U) U) U) U) U) LO U) In U) U) I N N N N N N N N N N N N (N N N w N aas a' IE E Z QR.o (n Z O N. O in' Q U 0 0 0 0 0 0 0 0 0 U U U U U U V O O m p Q 0 0 0 0 0 0 0 0 0 00 0 0 o) LL d Ci. 2 w w W w w w w w w LU w w w w ° 3 Z • • 0 o O o rq LI '. coic:?) v a 1 I Q o 02 2) 0 0 0 U U J I Q 1V Zco a .) 1 ca co >- Q_ >_ a i i_ .zt (,) co 0 IX J OZ7 CO OS CL ° U o Wai CeJ 0 `° a. it E s( a>0) vi (0 W W J CO rn a I V m0 5 _ J E Z °? M CO N J O_ ._ 7 o. o 0 CO 0 0 0. inc 20 0 O — a E w CC)U T M c o )1 1 E Q J 0 O P. m V I— co I I o N N C 'CO Q rn I I W CO N O F EE r W >, 7CO , Cl) O a> c , N II oa) l► VO x o @ v a) el C I Q n O as z E m —' o CI 0 o 2 011 as Z 1 d to v I co a I N N } } (Ni N O C O O O 3 N p F (/) d i = N > ani 0 w mre F. r�i F� a3 V O °% C m D Z c c6 O 0 U O O O Q O C C o w v _ •, o - d 1 �a E a D o a n m E a O E o E o o 12 E a, E E Q d 2 U a 0 0 o C 10 0 ti OF 7•44 • • �1%%i sA THE STATE Alaska Oil and Gas of/\ SKA Conservation Commission wet =-_ 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 re ®F Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Jessica Sayers Well Intervention Engineer BP Exploration (Alaska), Inc. F 1 L P.O. Box 196612 "t Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU L-01A Sundry Number: 315-256 Dear Ms. Sayers: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy . Foerster Chair DATED this day of May, 2015 Encl. • RECEIVED STATE OF ALASKA APR 2 8 2015 ALASKA OIL AND GAS CONSERVATION COMMISSION c -S Si ¢ S APPLICATION FOR SUNDRY APPROVALS AOGCC 20 MC 25.280 1.Type of Request: Abandon❑ Plug for ReddHO Perforate New Pool❑ Repair Well0 • Change Approved Program El Suspend❑ Plug Perforations❑ Perforate❑ Pull Tubing❑ Time Extension❑ Operations Shutdown❑ Re-enter Susp.Well❑ Stimulate❑ Alter Casing Other. Well Lock Techncloav ❑ , 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number. BP Exploration(Alaska),Inc. Exploratory ❑ Development 0 • 214-153-0 • 3.Address: Stratigraphic ❑ Service ❑ 6.API Number. P.O.Box 196612,Anchorage,AK 99519-6612 50-029-23011-01-00 • 7.If perforating: 8.Well Name and Number. What Regulation or Conservation Order governs well spacing in this pool? PBU L-01A • Will planned perforations require a spacing exception? Yes ❑ No ❑ 9.Property Designation(Lease Number): 10.Field/Pool(s): ADL0028239• PRUDHOE BAY, PRUDHOE OIL • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth ND(ft): Effective Depth MD(ft): Effective Depth ND(ft): Plugs(measured): Junk(measured): 14730 ' 9023 • 14698 • 9020 • None None Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20"91.5#H-40 46.49-126.49 46.49-126.49 Surface 2657 9-5/8"40#L-80 45.99-2703 45.99-2557.5 5750 3090 Intermediate 10989 7"26#L-80 43.15-11031.67 43.15-8727.08 7240 5410 Production None None None None None None Liner 3861 4-1/2"12.6#13Cr85 10864.53-14725.34 8590.4-9022.62 9020 8540 Perforation Depth MD(ft): Perforation Depth ND(ft): Tubing Size: Tubing Grade: Tubing MD(ft): See Attachment See Attachment 4-1/2"12.6#13Cr80 13Cr80 41.61-10871.53 Packers and SSSV Type: See Attachment for Packer Types Packers and SSSV MD(ft)and ND(ft): See Attachment for Packer Depths No SSSV Installed No SSSV Installed 12.Attachments: Description Summary of Proposal ❑ 13.Well Class after proposed work: Detailed Operations Program 0 BOP Sketch ❑ Exploratory ❑ Development 0 4 Service ❑ 14.Estimated Date for 15.Well Status after proposed work: Commencing Operations: OS f MI S Oil 0 • Gas ❑ WDSPL ❑ Suspended ❑ 16.Verbal Approval: Date: WINJ ❑ GINJ ❑ WAG ❑ Abandoned ❑ Commission Representative: GSTOR ❑ SPLUG ❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Jessica Sayers Email Jessica.Sayers@BP.Com Printed Name Jessica Sayers Title Well Intervetions Engineer Signature �..m:ho i- 564-4281 Date I /2_%11C Prepared by Garry Catron 564-4424 4 COMMISSION USE ONLY 2% I1c Conditions of approval: Notify-ommission so that a representative may witness Sundry Number: 31S -2-5 k Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: Spacing Exception Required? Yes ❑ No i Subsequent Form Required: /0 - 4 0 4-- APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date:5445 V L 4/303 M 4 0filrGiNaA JipithspP PIiForm 1,0 03 Revised 10/2012 Ealid for 12 from theof approval. Submit Form and Attachments in Du I cape i i RBDMC,\ c MAY - 6 2015 4-o//jr • • Perforation Attachment ADL0028239 Well Date Perf Code MD Top MD Base TVD Top TVD Base L-01A 4/19/15 STO 11341 11479 8951 9000 L-01A ' 4/19/15 STO 11519 11682 9008 9024 L-01A 4/19/15 STO 12020 12620 9000 8960 L-01A 4/19/15 STO 12916 13849 8949 8963 L-01A 4/19/15 STO 13890 14387 8966 8992 L-01A 4/19/15 STO 14427 14609 8996 9015 AB ABANDONED MIR MECHANICAL ISOLATED REMOVED APF ADD PERF MIS MECHANICAL ISOLATED BPP BRIDGE PLUG PULLED MLK MECHANICAL LEAK BPS BRIDGE PLUG SET OH OPEN HOLE FCO FILL CLEAN OUT STC STRADDLE PACK, CLOSED FIL FILL STO STRADDLE PACK, OPEN SQF SQUEEZE FAILED SPS SAND PLUG SET SQZ SQUEEZE SL SLOTTED LINER PER PERF SPR SAND PLUG REMOVED RPF REPERF t; 11 i • i Packers and SSV's Attachment ADL0028239 Well Facility Type MD Top Description TVD Top L-01A PACKER 10745 4-1/2" HES TNT Perm Packer 8492 L-01A PACKER 10865 7" Baker HRD-E ZXP Liner Top Packer 8590 L-01A PACKER 11301 4-1/2" HES Swell Packer 8929 L-01A PACKER 11479 4-1/2" HES Swell Packer 9000 L-01A PACKER 11682 4-1/2" HES Swell Packer 9024 L-01A PACKER 11980 4-1/2" HES Swell Packer 9008 L-01A PACKER 12620 4-1/2" HES Swell Packer 8960 L-01A PACKER 12877 4-1/2" HES Swell Packer 8950 L-01A PACKER 13849 4-1/2" HES Swell Packer 8963 L-01A PACKER 14387 4-1/2" HES Swell Packer 8992 L-01A PACKER 14609 4-1/2" HES Swell Packer 9015 1 I ' • 0 To. Ken Bulloch / Scott Bundy; AK, D&C Special Projects tri Tyler Norene / Len Seymour; AK, D&C Well Services Team Lead Date: 04-24-2015 From: Jessica Sayers, Well Integrity/Intervention Engineer (office: 564-4281, cell: 602-8715) Subject: L-01 WeIlLock MicroOA Treatment Objective This program is for treating the micro-annular leaking in the fully cemented OA. This well exhibits OA repressurization when on production and is not manageable by bleeds. WeIlLock is a Newtonian resin that sets with temperature as an inert, hard, plastic-like material. The viscosity has been tested at 60 cP. The objective is to use the small diaphragm, suitcase, pump to squeeze the WeIlLock into the micro-annulus with high pressure and low volume. OA valves will be serviced to keep WeIlLock from setting up. Well Detail Current Status: Not Operable — PAL Previous Test: 04-04-2015 MIT-OA passed to 1200psi Integrity Issues: Fully cemented OA, OA breaks MOASP, unmanageable by bleeds when on-line (all gas) Last H2S Reading: 05-07-2010 20 ppm Well Operation Detail Fluid Density: WeIlLock: 9.1-9.3 ppg (keep WeIlLock at or above 85°F) Musol A: 7.5 ppg 2% KCI: 8.3-8.5 ppg Diesel: 6.8 ppg Equipment: See rig-up diagram Temperature: Maintain 75°-80° F throughout the entire job Relevant History: > 02/19/15: RWO sidetrack complete > 04/04/15: Pull plug @ 10857' MD, Set LGLV, MIT-OA Passed to 1200 psi Well Program: • 1 D Pump 580 bbls hot, 180° F, crude down IA to heat up the OA. 2 D Evacuate OA void with triplex. 3 D * Switch to diaphragm pump. Pump WeIlLock. Take returns 1:1 in grounded bucket. 4 D Maintain 2500 psi for two. This is to squeeze the WeIlLock into the microannulus. Record pressure and temperature readings on casing every hour. 5 D Service valves and clean with Nitrogen and Musol A, if needed. 6 D Shut-in suitcase pump and returns. 8 D Leave pressure on well for one week. 9 D Leave crystal gauge on well and take pressure and temperature readings on casing, twice daily. Record in AWGS. 10 D After seven days, MIT-OA * Collect approximately one cup sample of WeIlLock in disposable container. Place sample in representative condition and monitor viscosity throughout job. Leave sample during seven day cure period. 2 of 3 • III 40 44, -' 4-1116C581 SA FEW 140713; WILL ANGLE>.79'4 1441f•-MAX '741.-LNEAD- - - 111.E00GLEB:172*a 11231'""4-1/2"CHROME MO A ACT1JATOW 51A103-{'. L-()1 A INR. OKB.0.-LV= 76,r - ,, — --- - BF,ELEV= Ir.* KOP= 1100'_____ _ _ 44 119 1021' 1 le-iitr fAiiri63ii 6791;101 .fyiguntirinR, _1' 7 Mx(Angle= B9'113 12072•:- — i L__. ..•..,_ „..*:, . Deam f11 e43- 246--.JP - . -, 0":} . 22/11' j--14_102'ICS X NPE)-3 8137,] Calm TVD= saw ss t)- • I co to, e ,.. _.. 4ifiirozii-milistis) 270.1' • ... 25311—. 1--fr i-cs--70-coaelasR-1 268T Hr OKR190-20tE ECP,4)-8270" 1 91----i-iIr C.Nvi,409,l Ill)8 rv4 c, . , trift-1-f -270T ..._ _ :-...,,, 1-9-75-78;641 62iii(iiiiiiii341r---472,4;-- La.LOUT WiLCOvi/1.0141 2103 2r20 Minimum ID=3-913"@ 3269' GAS LFT DAANERELS ST 14) 'IVO MN, TY FE VLV f LATCH FORT! EAR i 4-1/2"HES X NIPPLE 7 . 3077 2838 44 KOG 2 COIE1- DK ' 16 0403151 6 406.9 3465 52 KB1-2 01.4Y MC 0 102119/151 1 -77 5 5763 4505 52 KBG-2 30 1 8K 20 104/02051 70E --10F GEMENT -. -4.440. 4 7169 '5507 28 1(136-2 OW 1 BK 0 02119/151 ________ X ,A X 3 8328 8510 35 1(06-2 OW BK 0 102119715i 2 9483 7458 35 KBG-2 OW , OK 0 0211E4151 44' C r 1 1063918405 35 1030-2 OW BK 0 i 021197151 e LI 4 A r 1071T j--It.1I2*i-Esx NP,13=3 air 1 e A A Ir, 1074/1 1 17-h 4 yr NEB TNT mirk 4)-3.866 b, ... . II 10736* 1-1.!,-iirl-Fs x sr...113=3.air I I If 100er 1-rxs-BKRI-FC,EZ)35 LIP it/1 V 1193A CK TCP(3 4-172"LNR H boor . II 14 SLY.V=4 350" , ,,-:,. ;4-1 IT THO,-12 88,13OF1.86 YAM 11:15, 10574' • •7 .-ff.; ---et laspr 4-1/2'WIG,0=3.958" . /(0152 bul,V-3_958' ,,..; 1 I X r IR I H 13)8311 NOT LOGGED r IT. • 100,1*_lir X 5'DKR DO FLEXLOCK NOR 13=4.30" r MG,26#,L-80 YAM TOP14--80844, 1--riiiik .2. :. 10901' -f5-1f2 x 4-itr XO,D=3.95Er C063 bc• ID.6 271F — s ,..... -,-.,..... ._. :. . ... 4-1/r SLUNG SLY,ID 3_IH3" ria' omni cvc mit 1 404 Et I Ks sA43.1.PACKERS ••:. T. 8 11413 0 04,20115 1 3 813'NO SIZE 11 ICC EEPTH 1 LEM - 9 4112" 11304 3.96r 7 11591 0 04420115 13.813' ! ..m. 6 ' 12150 0 04120715 asix 8 4 1/2" 1)482 195r z. 90 5 , 12372 0 04/20715 13.813' T 4-1.0"I 11686 3 95•7' 3 6 4-1f7 11 4 1 13106 0 04/20/15!3.613' i 98.3 .966" -... 5 4-1/2" 17821 I 3 1 13881 0 04120115'1813' 1 3.95r 4 4-1/7 i 12879 I 3.958' --. , „ 21. 14258 0 0402005 3.413 3 4-1171 13852 1 3.95r •••' . , 1 14558 0 04/20715 3.613* 2 4-10*1 14391 '3 95r I mi EN, 0-OF04 O-CC. LC123 1 4 1.0.1, 1491/ 1 A 059°1 — -.., .7114 14611" F-14-1/2'BKR 34-LI FOOL V ERF1CATION sta 0=391.1 • 4-1/2i.-1:14k-12 WC 15C14.115 K10521,-4 1472,'1 Ala 14419er 1-14-1/2*BKR ISOLATION VALVE_0=1_00' Oi 52 bpi,13••••,•3 950" • GATE REV BY cohasan OWE RR'aY COLA/ENT* 1 PRUDHOE 8AI urin. 1 1 07101/04 cl•KAK 'ORIGINAL COMPLETION 1A411.. 1,01A 02/141151141 2121110ETRAZK il-/Ti A) - POUT W. 2141530 , 02T24/15, .11.43 CRLG HO CO1Wi'-.;-13-1;C i AR Ny 50-029-2301•(i' 02/25015' -J/.11.0 Fe4AL 00EAFERENAL SEC 34,T1214,R11E.2392 NSL&36,5'4 „ . . 04707715',.i&-M) MY 0Y3 034101/15; _ 04722/15 C1311743 OPENED 910 SLVS(0412(015 8P egploration(Alia kap 3 of 3 • • Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Friday, May 08, 2015 4:08 PM To: AK, OPS GC2 OSM; AK, OPS GC2 Field O&M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan;AK, D&C Wireline Operations Team Lead;AK, D&C Well Services Operations Team Lead;AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad LV;Wallace, Chris D (DOA); Burton, Kaity; Regg, James B (DOA) Cc: AK, D&C Well Integrity Coordinator;AK, D&C DHD Well Integrity Engineer;AK, D&C Projects Well Integrity Engineer; Sayers, Jessica; Youngmun, Alex; Regg, James B (DOA) Subject: OPERABLE: Producer L-01A (PTD #2141530) Attachments: image001jpg; image002.png; image003.png; Producer L-01 (PTD #2141530) TIO plot 05-08-15.docx All, Producer L-01(PTD#2141530) was brought on line to evaluate anomalous outer annulus pressure trends. During the monitoring phase the outer annulus pressure remained in a range considered operationally manageable.The outer annulus pressure did not break MOASP during this time. The well is reclassified as Operable. • Well status is Operable • A SSSV is not required A copy of the TIO plot is included for reference. Thank you, Kevin Parks (Alternate: Whitney Pettus BP Alaska-Well Integrity Coordinator GVVGloballr''ells Organization Office: 907.659.5102 WIC Email:AKDCWeIlIntegrityCoordinator@bp.com From: •, ; Well Integrity Coordinator Sent: Monday, Apri 015 8:18 PM To: AK, OPS GC2 OSM; AK, I, C2 Field O&M IL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wire -_.operations Team Lead; AK, D&C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East v, ••t Engr; AK, OPS Well Pad LV; 'chris.wallace@alaska.gov'; Burton, Kaity; 'Regg, James B (DOA) (iim.regg@alaska.gov)' Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integ ' gineer; AK, D&C Projects Well Integrity Engineer; Sayers, Jessica; Pettus, Whitney; Hidalgo, Ramon Subject: UNDER EVALUATION: Producer L-01A (PTD #2141530) Ready to be place„Production All, 1 • Producer L-01A(PTD#2141530) is ready be placed online to evaluate anomalous OA pressure trends. The well has been reclassified as Under Evaluation following the completion of post rig wellwork. The outer annulus pressure may exceed MOASP(1,000 psi)while determining the stabilization trend. Should the outer annulus pressure approach 2,000 psi, it will be bled off and a new approach developed.The well passed an MIT-OA to 2000 psi on November 10,2014. Please use caution when bringing the well online as the annuli are fluid packed. Plan Forward: 1. DHD: Monitor OA,determine stabilization pressure 2. DHD: MIT-OA, LLR as needed 3. WIE: additional diagnostics as needed Please call with any ,uestions or concerns. Thank you, Whitney Pettus (Alternate:Kevin Parks) BP�Allasska-Well Integrity Coordinator GYV O.ct a Wv' C'lrydir<tat>t;'r WIC Office: 907.659.5102 WIC Email: AKDCWelllntegrityCoordinator@BP.com From: AK, D&C Well Integrity Coordinator Sent:Thursday, February 19, 2015 9:01 PM To: AK, OPS GC2 OSM; AK, OPS GC2 Field O&M IL; AK, OPS GC2 Wellpa i Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operations Team Lead; AK, D&C ell Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well .:d LV; 'chris.wallace@alaska.gov'; Burton, Kaity; 'Regg, James B (DOA) (jim.regg@alaska.gov)' Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity Engineer; A D&C Projects Well Integrity Engineer; Sayers, Jessica; Pettus, Whitney Subject: NOT OPERABLE: Producer L-01A (PTD #2141530)Anomalous OA pressure ends All, Producer L-01 (PTD#2141530) recently underwent a rig wellwork program with an Ivishak sid=track.The outer annulus had been previously identified as having an external gas source causing the pressure to ride 341 400 psi, however passes MIT-OA's,the most recent one performed to 2,000 psi on November 10,2014. During the course if the workover process,the outer annulus pressure has risen to a range of 900-1000 psi,with gas samples still indi -ting the pressure is coming from an external source (98-99%methane).The well has been reclassified as Not Operable u'til additional diagnostics can be performed to determine well integrity. Plan Forward while Not Operable: 1. DHD: Monitor OA, determine stabilization pressure 2. DHD: MIT-OA, LLR as needed 3. WIE: additional diagnostics as needed 2 • • Producer L-01 (PTD#2141530)TIO plot 05-08-15 Well .1 SOW . u oo• Door Oa IASL INA ANIIIKM1111 =VS dN3'i5 EL'N,,S 034.1n3 IXYINS OS1N'. 0319`S O0513 ,aOu2613 MOWS • 7T %OVA- 63 Hunt, Jennifer L (DOA) From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Tuesday, April 28, 2015 9:17 AM To: Hunt, Jennifer L (DOA) Subject: PBU L-01A/ PTD # 214-153 Hi Jennifer, Please reference the following well: Well Name: PBU L-01A Permit#: 214-153 API #: 50-029-23011-01-00 Date of Test: 4/24/2015 Type of Test: IPT (Initial Production Test) Choke Size: 176 Choke Unit: 64ths Production Method: Gas Lift Duration (Hours Tested): 5 Top Reference (Top Perf MD): 11413' Bottom Reference (Bottom Perf MD): 14558' Tubing Flowing (Pressure): 380 Casing Pressure: 1360 Total Test (Rate f/ 0, W, G): 202 /218/ 148 24-Hour Rate (0, W, G): 968/ 1044/710 Gravity (Oil, API): N/A GOR (Gas-Oil Ratio): 734 This well began Production on: 4/24/2015 Method of Operations on this date: Gas Lift 1 RBDMSi* APR 2 8 2015 Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWelllntegrityCoordinator@bp.com> Sent: Monday, April 20, 2015 8:18 PM To: AK, OPS GC2 OSM;AK, OPS GC2 Field O&M TL;AK, OPS GC2 Wellpad Lead;AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan;AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr;AK, OPS Well Pad LV;Wallace, Chris D (DOA); Burton, Kaity; Regg, James B (DOA) Cc: AK, D&C Well Integrity Coordinator; AK, D&C DHD Well Integrity Engineer;AK, D&C Projects Well Integrity Engineer; Sayers,Jessica; Pettus,Whitney; Hidalgo, Ramon Subject: UNDER EVALUATION: Producer L-01A (PTD#2141530) Ready to be placed on Production Attachments: image001 jpg; image002.png All, Producer L-01A(PTD#2141530) is ready to be placed online to evaluate anomalous OA pressure trends. The well has been reclassified as Under Evaluation following the completion of post rig wellwork. The outer annulus pressure may exceed MOASP(1,000 psi)while determining the stabilization trend.Should the outer annulus pressure approach 2,000 psi, it will be bled off and a new approach developed.The well passed an MIT-OA to 2000 psi on November 10, 2014. Please use caution when bringing the well online as the annuli are fluid packed. Plan Forward: 1. DHD: Monitor OA, determine stabilization pressure 2. DHD: MIT-OA, LLR as needed 3. WIE: additional diagnostics as needed Please call with any questions or concerns. Thank you, Whitney Pettus (Alternate:Kevin Parks) BP Alaska-Well Integrity Coordinator G . k Y+ a WIC Office: 907.659.5102 WIC Email: AKDCWellIntegrityCoordinator@BP.com From: AK, D&C Well In -• .' Coordinator Sent: Thursday, February 19, 201 °.1 'M To: AK, OPS GC2 OSM; AK, OPS GC2 Field O&' • 'K, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operations Team -•e• A K, D&C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS ' - '•• LV; 'chris.wallace@alaska.gov'; Burton, Kaity; 'Regg, James B (DOA) (iim.regq@alaska.gov)' 1 11) • P70 ZI5 - O0S. Loepp, Victoria T (DOA) From: Loepp,Victoria T (DOA) Sent: Tuesday, April 07, 2015 10:00 PM To: Rosenbaum,Jesse E Subject: Re: PTD#215-005 03-15B Planned BOPE VBR's size change Follow Up Flag: Follow up Flag Status: Flagged Thank you for the update. Please include with the approved PTD and I will update our files- Victoria Sent from my iPhone On Apr 7,2015, at 2:37 PM, Rosenbaum,Jesse E<Jesse.Rosenbaum@bp.com>wrote: Hello Victoria, During drilling operations on well 03-15B,the Doyon 14 had a set off 4-1/2" x 7"VBR's in their inventory. We decided to replace the 3-1/2" x 6" VBRs with the 4-1/2"x 7"VBR's as highlighted in the revised Ops. Summary in red. Planned Rig Work: 1. MI/RU 2. Test TWC from below and above to 3500 psi for 5 minutes. 3. Nipple down tree. Nipple up BOPE (Configured from top to bottom: annular preventor, 9- 5/8" fixed rams, blind/shear, mud cross, 2-7/8" x 5-1/2" VBR). Test BOPE to 250 psi low/3500 psi high. 4. Pull TWC. Circulate out freeze protection and displace well to clean seawater. 5. RU and pull the 4-1/2" 12.6#tubing from the pre-rig jet cut at-4500' MD. 6. PU 8-1/2" clean-out assembly and RIH to clean-out 9-5/8" casing to top tubing stub at 4500' MD. (NOTE: With 9-5/8" FOC at 2332' and 2461' MD, no casing scraper is suggested for the clean-out assembly.) 7. RU E-line and RIH w USIT/CCL/GR to 4450' MD max. 8. RIH with GR/CCL and 9-5/8" EZSV for 47# casing. Set the EZSV at -4300' MD as required to avoid cutting a casing collar while milling the window. Top of whipstock needs to be set deeper than 4300' MD for anti-collision. POOH. Rig down E-line. 9. Pressure test the EZSV to 3500 psi for 30 minutes and chart. 10. MU a Baker 9-%" multi-string cutting assembly, displace well to 9.8 ppg brine. 11. Cut the 9-%" casing above the TOC as determined from USIT log and circ out the arctic pack. POOH, L/D assembly. 12. MU casing spear assembly and unseat the 9-%". Pull the 9-%" casing from the cut. 13. RIH with casing scraper and clean-out the 13-Y8" casing and dress off the 9-%" casing stub. 14. PU and RIH with 9-5/8" Baker bottom-trip anchor whipstock and 8.5" window milling assembly. RIH to the top of the EZSV. Orient and set the whipstock. Shear off the whipstock. 15. MU 8-1/2" intermediate hole BHA (Res, PWD, GR), perform LOT, and Drill to TD in the TSGR. Short trip. RIH to TD. POOH lay down drilling assembly. 1 • 16. Change out 41/2"x 7" VBR's and test with 4" .and 7"tesT joints to 250 psi/3500 psi 17. - - - = - - - " - - - - - -! --' e __!! - • • - . 18. RU, run and cement 7" casing string. Test casing to 250 psi low/ 3500 psi high. 19. Change to 3 1/2 x 6" VBR and test to 250 psi low/3500 psi high. 20. MU 6-1/8" production hole BHA (GR, Res, Neu, Dens) and drill production hole to TD. 21. RU and run 4-1/2" production liner with a swell packer and sliding sleeve cementless completion. 22. RU and Run 4-1/2" completion, circulate corrosion inhibitor, drop ball and rod and set packer, test tubing and IA to 250 psi low/ 3500 psi high. 23. Shear GLM, install TWC test to 250 psi low/ 3500 psi high. 24. ND BOP, BU tree install BPV test to 250 psi low/3500 psi high. Freeze protect well. 25. RDMO. I just wanted to inform you that this was different than what was approved in the PTD. Please contact me if you have any questions. Thanks, Jesse Rosenbaum Drilling Engineer I BP Exploration Alaska 0:907-564-5155 I C:406.533.8984 jesse.rosenbaum(cD_bp.com 2 21 4153 I • 25 55 1 SchlumbergerTransmittal#: 19MAR15-SPO1 Drilling&Measurements DATALOGGED MWD/LWD Log Product Delivery 0/201 M.K.BEND Customer: BP Exploration Alaska Inc Dispatched To: Makana Bender Well No: L-01A Date Dispatched: 19-Mar-15 APIN: 50-029-23011-01-00 Dispatched By: Stephanie Pacillo Well/ Product Hardcopy Digital Copy E-Delivery Date Delivered To: 19MAR15-SPO- AOGCC Makana Bender Contents on CD N/A Color Log Prints: 10 VISION*Services 2"MD MAD Pass 1 x VISION*Services 2"MD 1 x VISION*Services 2'TVDSS MAD Pass 1 x VISION*Services 2'TVDSS 1 x VISION*Services 5"MD MAD Pass Quadrant Density 1 x VISION*Services 5'MD MAD Pass 1 x VISION*Services 5"MD Quadrant 1 x VISION*Services 5"MD 1 x VISION*Services 5"TVDSS MAD Pass 1 x _ VISION*Services 5'TVDSS 1 x Digital Data N/A Contents on CD x Survey 1 Contents on CD ASP Final Survey x x EOW CD 1 Contents on CD Graphics: PDF RECEIVE - x Data:DLIS/ASCII C x Survey:PDF,XLS x MAR 19 2015 ,AOGCC Please sign and email a copy to: Please sign and email a copy to: AlaskaPTSPrintCenter@slb.com gancpdc©bp.com Alaska PTS Print Center ATTN:Merion Kendall Received By: ()),„ttiga.,,z4,...7/7) 6,..zoteat III • 0 a p=t o +0 0 o 0 0 o c c 9 0,f W rt g **5 L 3 0^G ^y ^0 7 T • m =2 n j p 41c a ny.i.c7 c "3 O m ,'� i r m O a r a ° E N SC gd ° 9 N '(i m t m vt g X ; o m W N v v v v v N N N N +++++ +++ _ b wS O ro E ll E W O FAM U V 'g F-V P N IO A O W W+ 'AEniil J LIA +V N J O O 0 g .opo L�o wo0000 mF.:RIT 'o+wain oin oo013 i° 3 a eo Ooa N W m W wmN w W woN W tnoaN W Tvu.m N to.o coo^O o o z z z>tYT r r ' T Tb8bOT2 'Q emm9. $2nw> 0 2 t OffDNo 0 ';No, 5;a A A+O %“4.'&'twi.(wii U W-1+ ..... 00000 j Y W y O N O - C N O J W W St TTMT NJmtNi g NNW bT�1 O+OP4 Atmi.W 0..T0 wOOPw O x000 '_ W QY �.O O ,, O Ca N \� W ' m ? cto R 3 W > a v3 3 U O jN mf NNbO 22222 NO+TVV VO. Ow+bT� TTOTa UNbab J0000 ,m mWw0O oaW+ o OPWAT Y.%F. ANUNO O�NT,T 4WGC+I JNOGo . mOo C-J ❑ P L 22c' L,, oto NO OG 'T ',Y, mUVUV. t +> AN +NNgJTtNWWa-10yy - T, A OJTmo OWONw e mr , ‘....,n1 W WWW 0 Kr" C A ,rNOOAO JO=-ols OOOOP NMWa W1°T , 2'222'22,9T +YmNO W,gJTW ut . N i- T N N N ,-;;=.1515; + 2 JNOT W O OAAA W ti UPJ o G ` ii cl) W W W O W+oU W O PU W W U W AOw SIO tW CON +O W Nm '‘',' TT 28222=o \ m gggg om-�y0 fggiG W 5 C im?!.104 mm' s �a 3 � C � t�nom'_w ..i 2�1:°am A d " 1 a o aa� 1o3 o sva'7 a o 2 raft c T;;tt"io .',TTm '6:TA & "TToA t'�,o 'We= -.4..00 ,^0'00.01. A.nnio6 2tr;-2,15+m ^ o . Cl m N UNoa. OONYW UO+OO 00wwa +aWN CC.oP NPNWo. a00 ^n ^,z $ m,3sp g .4 'o'mFo 3 f o n a. _ ns W isa 3 ' 3: a �3 2E,0 §1 0 C o 2 n c 3 3 S ? C A J J J W o m m + !!! T A O S J O O b O A O m N DT .nw Nmu.uu eo.oNY +NNwo T= tn :::::. mP000�Ommmm _ nO V +tAWO •NOOUIwwm mm N OTOU+ w P J 00000 w :i>0o ^.Z JW a oo ow �� F �a o —01.4. 4.— N .....`n o N .�,." d 3 so my +b -. =a > O U w o m W 0 m 0 C J O C O U V O J P O+ O b a C- +w a+W W V o U w 0 0 0 0 0=16^ `s NU A P AWOO+ W N N `'''718'm nO V U 0 0 0 � O>TT �TWa U7°,:i7:;,; W �aW m OUV W,==3 22282 U A O + O0S 00CCV 00OA mW .0+ wb WPUO700T OY00D±o HV T b b U d U IM-5: U U U T O b U O T U U U U U U U U V T T m O V N O V V Iv J J V J V J J J r V I J r W J J J m W V PAH V I I J J J J Y J J V V J m W W m m J J V m O O O�O O W O + AOYJ. TOTONotmi. A OtVi.t00+ llvN AO. V Oho m U PE R§ T+ 5;85;5;5;,:a- 3 � J .O w wUwm UwU A W a OU +W �v +No .OJN2 mu.+N m 28:5122E492222. OUO Oo m W mm mw W lin 11111 J�pJJ mPTuwmi Ot W U W W N W N N m rJiwi o'>vA !MI MA OWVCT a O W U J w ::::: paN22 aOW UwwW ONWJN :::: U m UmO o 0 8.8888 0 0 0 0 A w ww gvs lim w N A .An �An 0v00a 00 c5: Tin oN TT J a Yom-AitW,.w m T 's am, J m tmi.wmw W U Y W mA �Ort.�irn V O<Nn aUJ aUYU W oNa.mOu ! :! w T +NNttiN NN NN NN N W NNN NN N N [N N NN> W NNNN C � tmi.OU�d tOi.�o W N U m N Mil A C 00 NNN 00000 m W Mil vp� P Jm.uy P N os m MILE V� • O 4 N N (D N W 0000 oOm2 V OmTtmTb OP TO V W Oi NOOUOf � �lAO Ummm Q � rn cn ....% ...A col CPI U) 0 m. I tV C m{y,Yy�}'�` tp�```y�y�y�3'''eee��� vg! tO N222f22 Mr. ESX0; Ggpf2 Au c C 10,2 8 raw � OnDn cowooN VMNNt00 �opm mm pMN.02 8848,c2 22888 0p 00000 OO,Oo.T AWE AAAAA Ones OfAO� Q gNNf O�O�Oi O 0 MMMM MMMMM MMMMM MMM<'gA AAAmA M<'YMC?M f?P?222 AAAAM 282172 NNNNN NNNO�N NNNNN AAAAA N cr.� J Wmm2 222Oiai Ol ai42422 22006 222242 2.662 66666 66666 66666 622201 666.66 26666 224222 O Q a a a a a a a a a Q a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a a 'raver* a a a. a a rrrr . an77r7r 77777 77777 77777 7777rrrrr 77777 rrrr - 77777 r777 r7rrr rrrr? 77777 r gi OmVgN2ON 82322 82" 22322'.2 p0NrmVggg R . A fNNRM my IZ' 0rnr7 O02.-19-m wz2mA§GO gU7Rhv7v00 3 M2mA AA222 22 2 A01,1,',.r, nnnnM nOOWmm2 m mmmm2 0.22 2 AAA AA AAAAA AAAAA tf' AAAAA AAAAA AAAAA AAAAA AAAAA AAAAA AAAAA AAAAA AAAAA ti 000000 66666 00000 004500 60006 66606 66660 66660 00006 000NNN60 06666 66666 60666 O N GG r�pp O p� v V (J G C fp aCpm2nTOM1, NNOOitiM 28288 2282< 88:1'4ogrAgl ,25 12p8 ap3aO;n M828S1, N�g$Sti r-N41NM 28..7g< 22 aanm4.2 fe2.py2pyp�;g21�77 fSppVO>Nm $ W iNWmm IAMO,Mm 0210000 MNNmv 2NiDA� Mmm 00� NNrAON H2AAm OM10,nN dMNM2 °iN1 2g m4DM 1`A nrm20012 W Eng R222E EE CARR I ��� X222 g l §11Em 22222 IRIEE E22RE bhEN E F r- O)Q 06nnOn al O1OON OP ";. �i,wo2n 420 N Aoov0 42i,�R'i,! on0i�0 rnowmo ns000 m amo (my ll�i,NO4h. ,ViT4 41464 a�aeacv vaoMM VOIR MF' °��r� 00000 45452622 rnmin"'gg NNVN 6rnrna',m rn�mrna`E aiohss a nhnn :nnn n nnn 6666 hh�n =O OOp r n4 nNN nQ nni nvi nQ nr fir nM�m hn mn�N �M n6 nVr n.r-hr nnnnn hrnh knrnn rzhmm mmmg4— g!2N 2n 2n2 2222 2N2242 22222 22222 22222 22222 mMmMm 22222 6222M 422262 2424222 mmmmm 2 2n22n2n2n26n m Jw<2n 881; '45220 22 . 22V06 222'4 oVQo aooNe VV2V2 m8V.9" 22Np..Oa2gr:,n O;NON N 00000 r00 NNma .MMaM M te2MVmmoMfO 22M 8p2 22M $8224 4,28822;9.8 02180 8O267 gNNMN TAM? .2mpa�1mmpp Ag.2$ 24287.T� 2822;. 22;22 O," 8202 Mp0 M2NnRN02 MMnN. 02Nppm8Ammmh NMMdW42pN VNNNN N �N M 8N0 $ hOA A$88 M 2 ZiP.2g 45am42m 88m25? 21882 mgeVN4"88c'.18 VIt282 2822 OV,28 NMNm2620 NOOAO221S Vm rM2 : qOp N5c6 NOmNQ2M 9nn n0? ? DOm im NaN00 O .7 - ' . E Nm2W 2P.,8:22 Aoo pp 2A 28224 22,t UN2222R MNehg 22m:222mm 5;12222 MAOpp O SM282 4m NPA QQ M4sO m0022, A p2NMO . OtMMN V< N • MtmOmW2 220WOf002 MWOMON V . .A. NMSVV. mNOWrMm U rr r ,,,NN NNMMM MM.. MMM. MMM ,NAW M Ji Q 2'4 gs22m2 2280 V 8;22G RrmAQpp AONr. 288 22s NO 2222Ma v map 222 ,1> 2°22nA hI2VMMO2 :2228A 22OM 202M2m02 N(m. O p2,4,646 NiN•-,86 ,46464 m"22020 c'nFVnAMV MTONNNhi,aN MjMn MynA MM7A 25240 0 • W gg$-V2A8 Q0 88222 a Nt22 Mm8222 2:7.822 82 MNANaO 26-t.128 MmmN 3 QWNON $ yOMNM ONAO2M2FN AO2M pp .?7f1=cicA 13 A 2O-Ocl" AMONNM NO22N $2200 2A2A2 02078 �,3N�� V4S.7o Npgg 2 "7 NNM7M7n 7999n M?M 99999 d {e 6202 At Ohm mM 2060456 282; 20tp600 080102 00000♦ 2;00000 000BOMV, lMO_t700�n MONrm 0.n22822 a-AVG MAODO 1022201 2222g OAAAM 8apAaA$8 VO3MM E444 NNM 44 44 amm22 m 40222 22282 222.2 H NNNN NNNNN NNNMM MMMMM 17 I.JMM ((.0088(7 �p �O m W E{6p(84 HOOD p ! ��p<ppO Mp law {OMpm QACD(�V4 I�NAtN")m s�Ap{Opsa eNm NQ�lr fnO�O �aOptONOo8 gym$ g�mMppg22 Oppp82{;; 2022:28 in;ao (pN�fs v.7.QN 1� m22g 6612+28 0(02016 WA IIN MIM+fMVS4 nM R*Cgl, ;$0,CO .4482 4aA222 A1,2mm 22000 ONr,iON 2142 MN1 M N N N N NNNNN N NNmNNN N V. vp V V �vv V V y v*V V { V V V .. a (p g vWAA aMBAS 8828A '4ag08 MOON. $41Ap2o11 OV2222 82222 28282 2822A �2 422 ;1; MY+2+222 :2 �N ONnm O f 'alai OJgagg MNNNr 450Nam mmmm 020001 201000 00000 '0'00 0A2T O'10+ON>012 ODODAAI� 66228 a r r r 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O r r 128:128 42232 2268067 $211:2$ 24824. 88A@T VANmm m" 222 tn.r SAPZ OO�AteA 111282 sa:isq �mTNOa�J M Q<QC 2;0,10 22822 MMMMM NNMVf ONY NN22222 22262 NNN NNN . :144':144';4NNNNNVd� Ya 4288)A l7�77MNNN g 2$28 MmmmpApaN f7E42, 1NO 28'43V. Q12C1i1i22nD 8,714.4,B 100,2010(8 8°2221? NOmPgti; (2',EAOES 00282 NVihas 8(Z4T24OO 2 mmAm 88p2p 1n0SAAA NN2M8 68171'0(7 MMOdV OC2t2O� 40217(1 YI N1a§oN N222:i 102180.O IO afmO222 EN22t0 iD l^-Pnh h O NNl'l 17 MMMMM MMMMM l(7 OO N U 8 411 • to 0 1. §1r {pp.pp(��p ryV {pp tp C ��pp Cop �y¢� Gy C1 ply}�p poi tV yap O Q opp 1. §1r pF�(;41[69�pN((�V��ff81 ,T,T7,,22 822v4 p811 I2�..pp�t�Q4.}222V.ii;.8aY� 8q'022 p8 7,1E82 iiRp�0g OO8(pp1 2O) (24 A ling {pmnm{pp,iFtt 4 Oi1'h O72 2 pO%%(8 pO2�f tp8 W �a) KiNNN RN NR � N� NgIN .\ Ah NmO Al NNN01 COM. NNN is NNN N 'OW SV[aJf�`IA WN G Ommm ai6moim 6mmmm 6047;2;6 66666 ammmoi 66666 mmmmoi 6647,66 mmm6m mmmmm m66mm olmmom m aaaa aaaaa aaaaa aaaaa aaaaa aaaaa aaaaa aaaaa aaa4a aaaaa aaaaa mamma aaaaa a 222 r812 2988 AS222 gt5,T,H A '65 8.1c814,'Si umiemo . ,T°M'$m� �$m�8 oma 0 EI: ER8En '4,28281 8Rh,RNt2.A � 11--8 "tel VWp.a r1 8888 ,,,,r rn __wag �" uiSS tiS AAAA AAAAi,A AA,yi,AA AAAAA AAAA�i A2220 'a`;MMm,'�. MMmm'i� 2AMMn nc'�i,M MAi,M ' MMM Mnan M. 1 n r, 0 00 g50 0(mp ^0000 oro,o omo 12`0 fo,0� ,O,'(.o� (yo QA 000�mo, 00^10`' 00200 0000^ 20 0 OF-5g-' 0000 0 CmpOHO2Qa0p1, 0080;pRp�2mm mN papppomp),�Opp8P mmM fmO I�np.mom- pep-Omf Nm 17,M NRn(.7. tm?�RCV mN .p8Cm8 mAA2 Woml,tmO,MR yQR�pNpp OSapp �8.`2,OJ ?fR pO�O{aO pNI Rf2C'f4[0p t0 028 N CNNOO OOOOO ,00000 222OO OOOO 222 11 21E22 alis%22 EUgRIE FEHR 12222 22 tot�D22 22222 2 W .AAAA h A Ah A AAAA m,oto o comm. �p {p (p fp.p mpm yy pmpp mm 2 028 FEHR m �Oyy gsd Q10D�tp m 0'1,024. O�;ON AoRA;tPp 287.22 47aWN80O aai�8i.,ry lav2AV �ryNmm af.Np,isisa 082:=82 g'.284N 0.11A.8V2 288808 f0 ;.s NNNNN Nct;g <f00,,aAD08 m0Q10 OVgNN {myMOeLiiN �,00i O,'A0A bNtO GgDB ON 47474706 oO toN+oB �{"!<160CD mn.p=N�(a.�.0 (n.�(�yi�(ppph�lA 0 p1^tin 88288 MO nA 1pr.�r hl..AAA AgA 0888 8D42 22EEi 470,01 0026 ^888 nAtilin 168228 A6�Ap�� A N NNO COO Nva{Up01 N.m[l 808,478 NLO1 h4J,f1��N1h Nva Vmi pHN phff aB vM' OhppHMI NNNNN H,maNNN Vmi,m[gsN 22222 N 0C22800 88281 a8l284T ;81820 00000 8P;82 NNNN4 N000N0 00288 24248 2'822 N000O0 .2-88,012 00 Ooormaa owi4O4 ha. 40 CC1O�O OGCGC OOOGO 00006 CGGOO 0.-,00 V�eA� AVit'.- �'^6A 60r6M 0 W 6-8028 WNr2lV 24 0081 A((Aey10VM am;24 mMNm.1 WCNVh ;8802 OONztp. 8V2A0 8,%2;22'. 2%242 q2;2;8 XXN ,7,0472 aI WNgAN 88218•,^1 tiI�AQ.f60t0p ,A0, ,00AtM0 'cl5ggg 3'i"1 8ap0pnt" m4 c"g Ogg{+m�SCMOJ mCI NtNy0110 �OppO""g 0 OA 0AA7 ,AAAAA7 MMMMM AAAA+°; MMMMM c` 802 20220 a,a AAAAA AAAA A888t`."1 08888 Mt7A;A AMt^ 84 pN ZCOCOIV ��ppV 01708080 pp100 aV�tr}p 4710 aA�00 �W�Of ROPhn� ::::: ::::: :::: ::::: “Igg :::: OA00almg ::: 00 00000 :::: 8. ' ppCN .2-A100ia8 V088V ::::: G 808000 AiNO Ot�O�mB V tai 8888 881181102 oMotmnt°�iAA ,A•lOA•1,A•1tA•1tA•1 ,tDo,`S'iAA AAPA2 ,i2.1m�m'M2,i2.1 mmm01210i01 mm1�'c�im mmmAA AAAAA APO:r `t� 2g4Plm.Nn 6 g M t� (.� a p a {+� pp pO 2=n6-,2g 8Aq,” 8861.8 4123<V 8gaf f0 020,004 �AVBm Aiinc,er '42260000 .A-Or080 ONA80 fTA222 22;g8 .047 0 'vee 42420 `455':212 `:47147<°'a 1282; ;8828 ,2;82`2;`21 8:i21N O�7S888 AA888 88881 243IS 18/22 m aal1 ��pp �V tai v 1� W 2 iVN W°Y1phpp..S x1$;71183* O�/0�pp{<pp�Rpp,6D ,7432,yW0 2514.:202ti0$ ,(Di VO t?t e,,mpytp� b;680 pmp Oe�OMaDR 7-At,“8r2 NNhc09,3 c.1,! R m ' CO�SM A % �1M� O�fA+�1fAt11 CA�it�ggm MCY1'r Cox C� 1 llg, (7822[7 f7 P°P l�f til mN 4m N NNN NNNAN NNNNM NNNNN N a yKm02N bl[f 21 80 0O oooroo NNNN Ola <0 (0 er <fNfa mO; 0,00gM VAMNtO210080 �8 V 10 .N 2.7R$N Oq ga, 80ANM050(0 1m4700D ;28222 §08; (( a. 8020tAA 80000 000 0 0,-;0,-;,-0 00000 p;08 2 282 0888 08 47p00 (0 t'w82pp11,60 8;268 MAR2nNAMM 40282 pAO�,1p�0�h�M 2334AOgpp41 tA0,8(i0�(��{{NtN�, tDt 2.°0,20 ttA o�.D48 f�p�(O0�Dt0APR 0p�pp Q�omR IMS tN� sM00.080 A1mm Eggs 04p02p4708p; NNNNm1 ; ,OA WNOVN 8{7 ,800 f20Ama1 8m00ra8 Aral ODm0A02mr Ens% 000(088 8080280080. 8 0,00.47 0(000,O0 t0w80tX 000.00 tOOAhA hAFhA AAAhA ff mm 11�� {{..J1 ee��eepp�,pp p 2��m1<8� mmryntmi, 0p00pta0Y0p, g3aaOt57Q}1m8 W,A5A8N NaV'?08VV 62082 0O1NOaDaAa4 p�pm�~pRy 44("irlmNO 02 :1,0 7.X4244 O4,,66 V4%48 0 tVBRV OtLaOm ;AAAA 17(70'AA AAl7AA At71'�OAA f7�A'1cAAA t7AAMA 170JA{Ai A AC1888�1 AAAAM AAA22 NNNNN N a�E1 t� 6 C._ 24P8 2;2'0 ,,sz-NN tet.-44.S e88;t28 020.0; 4818A 7Z0On2 28;7.44. 8;;44. p8828 2FM0 OmRRmm NOmm NNftM ;; '8222mmAAA 2A22.2 AAP22***A AAnAA angFiNl A8282 00111:8; `473'42288 2 2 AA,V9V�i01lG0�V MgI471t47m NVNmN av18N2(,0(OV0 80pl24 .c2 tVVVA 'MEE (OtaDaly tmr .a-tv alUl�ry 001<OOmp .4;*gA CMO(AB ONpp ..1rp.00D!.VsG 1t)CN aN t7.� nl�nh nA�BaA 88W88 am01200A000 0471�afo11 'MEE OO EE 00000 OOO�O Np NO�" F,E 207 x40;M ,AD 00'8 r cc r �� N ao 8 t R O N 0 g 8VBER 12287- 2R22 W4i2R§ Gre; 4g222 RS� R ��4 nnn,R R 1^� W`? s 2 Soo-Wrmm 2- 20 s FN c C 10101011010 Qv101010 N a ins eE e4)c4itn Eg t gEa 1� tomi�ia r� inn mt�M MMMM07 Mtq e?ta t? 2 '� of ai of of moimmm mmmmai oimoimm mmmmal ...m. mmmoim .maim. m...m ai aim aiW maimmai ai of tri oim oiWWaim m Q QQQQ QQQvQ QaQQQ QQQQQ QQQQQ Q<QQQ QQQQQ QQQ..Q�Q QQ..QQ�Q,-f QQQQQ QQQ<Q Q.-QQQQ a.-,Q�,Q.-QQ Q 4 WV 1C- 284 SStOSER RfertTAT:= Tc0442E 2 A2S222P2 T NQW C. O2p2WONNyQp2p1aS10 mN 0� 0O AAAA AM22 2 MMWWW pmp044" y � m MW0aWAMRA A22MW WARS WC7nCMMaM? OMMM 222 27 2200mMmm OM a7? 0 � 7tNNcILV) rrorr r00�0pp0 to_P000 O0000 pOpoo00 00`000 UPPP poo A(o.Ooo 00000 000�0p00 m000m00 ^00000 00^00 ayCO3 1AC;rO 02ND�0 3jr8N) (0I0T(W7IWP 1110)))2'))))2:4b2D,Q4 HIRE 2FtMDR2 O20W4y811 fC(0p11 pyZ 00 OA2QA4 SAV W'm18 tpV(OD.µOmW MA.AZmO}pF 220, W fD Rp OiD 22222 ^OmH IIrfOO��tJ � iiii W�OW�A W�A��AO NWWUW'fW WWWWIA NNa ��WImA ALM AAR IA ODmW W W W mm2 ONN�WW ���y W1I1 Zp 2WA 14W 46 002228 V)On VA4 F284ti PAWW�108�2 V8p0w4 OaA2V7,88 N8TATmA <OnAOp 2 P8M8A 3rnNs MMmOm 2 48OT O Rnri 28PM2 NORN 422.7 22SP-P WWTOO WWNR0 WNmWO P2268 VTR"; 220420 mRAPR VMn0 N o. MTTTT s0C0 VcvvvQag<m mmm$ Coq.. rcmmmC AAA crrrr 1rrrr rrrrA wrr rrrmmrmrrrrrrA rr0 rrmrr m 2222 22222 22222 2222E 22222 22222 22222 22222 22222 22222 "2200 22222 22222 2 j hNnN VC.MO)0m NONON (004001? 00WNN 100100 NAONO 000N)0N 4TVER 000Nd 000100- 4 -COO OOOMC) O 0OtCmom Qui M)CC n00�G WNMWM MOVWV QNWMW MM'WM WMMN OQ��1� v.v,o ..v.r `!�GW2 ...no W ,%vF22 0 2N00 DWGAR m Q2VM A2282 24224 4000 O2A82 222*A "NM82 t:-43 4 P7.2328/2&2& POWP8 O 10pW00(0 ; pW0"M' 2 ^p00TpTOWO "EEE NN2 ;'AM 022 22" N0N N04NNNNNNNONNNNNNNNNNN DDUT" `1O 2,gNV0MA22 gP2810+ MSPO4 12428 A2WOR OOPPM VANIW ;WPRA 2NIW-A; NC0V*2 FOOP< ;mMm; 00MN2P N ,T,222p2 W 22 NMr ;Op A2 8222' O r e A 2m 2 2 0 G �SS7-7-"RRA 4A��' 2p$R �w�2N 2ON O r - NNNVNNVN'F �*ovv ^bvvMv` M< v�vQ Qa UE=0M2t7AMrl7 27,t824 OTIi RN G2NV AO o2T V NNA Q O V 84T N:NN4 22:24* 24;00 NP W MO P4PTI W p P4MR O,1NO 10T 10M 042 ROWMA '220m 8F2� RPRRR22R23 0WaON v072" reW02 0^0420O COpMMM NN101 10N NNNN NNNNN NNN0 NNNNN *NNNN 000 22222 R2000 N O4O a 13 ;,-222p p S R0rp O FF202 TO VA< 0AOgpp M 27242 GF2NO RR2RR0 <P21820220 42224 T.,-t;-422 0 Q RNg2 '22r4 PORMS pM2R; OVR40422M22N2N2m004^0 2as-0201WON 0W rgma0 w22§m error rnntin rnrr2 000010 rrr00 WOOOw 22222MAZ22000 �y7 M _ .TT,, ' 0 m ru W OO'W 20212 OThmr e0W<W0 MASSA 0)QQ02N 002M2 22OO;cP 42PR2OP<2O NA0Mg00N O IWHOnV 0t38vQ NIMOti OO1NN O;Na1N20200 g4'0,7Nm;NA 8A2mm2 O0" 04NNN NNNOQOW WWWmN prrrW 00;WW <QQMM MMNNN OmO,A W V 02 NNN `-^7771 1 0, e 24;2 (0eM-M0+>2 OOOVP 8282R APORS 22220 82481: 28222 MORS NN010 001882< NMmIOVO 84V48 FA148 cpp2icp<p2V8 8p'11"-X 88°2rnOaOm mt�Itt§) 22228 8224' m"-4040 22222m `8' 222222222 �"22222))mmrn rno41 ga rn 8282 M R 2 2 2 R W W W% 22222 22222 22E.. 22222 2 00 2 10 E 2 2 2 2 2 2 2.2 2 2 022 2t SSS RmRMT POOP; ea-nag n2NIhN Tr-SFS 8[R22P 32FttP CIZNNA P0OM00 42P4V ti 2222 A . pap . v < 88888 88888 Y.82E ES222 28222 2.222W1E1222mtig m282. AisR 8228 gWWO 882aV7:3238 QOaaP F0qVX 222281 VA0N42 248V2 AWam1 WAPNN 0WPDW 4RMSIZ S88124 S WW2m 00WmTOWWtiPPW 22"2 'TM?' N" "2p 22222 222" MRm ANr NNNNN NNNNNNN NNNNN NNN NNNNN W" "2" NNNNNNNNNN MnnsMM 81VMO .OV422 42822 Aaogwm t0 NN82t: 88Sa - 2224P 2VMAW 8862V 8NP)NV 48P33r44 22828 trANOMN P 22m2 W'8,m$o OOpOWi8R TT`a''44 30022 o o 212 22,,TT 18;22 288rn8 S2S88 oN,o'I$omlm 828w8 28228 a 2.anga r2r MO WOnOO;A AWS22 P441-615 24A:1-8 O2 24T ARSP 8P :28iiF SAP 8 SRP27 Mrm224tGbF 8a SAP OO20p2WO �AQNTP 041"' 2802 V"2; "n2 2" 2 O O r�NNN�NN_V_V �ONVVNO _ 2__VN__V_ MMM22 f72fl01`222 Fr- e _r _ Ve - CO - r N 0 tV 8 � O o L 8 0 • • 0 0 10 4' 2282 MAmOO28 NOOO!D h 02!2 2 0 09NWO! 2;72 MM 0 r X20 22228 882228 0 CNPWD 2E228 WNCNO 0,O C HnNM 22082 2122DNrhh rl�rr8 28222 .Wm a J y» !!!! MMMMMM !!!!! !!!!! M MMM mrnQOQ OyQ▪ WO N!BN N OT0 MMM WMW2M PN"0NMWa W!SiN 00 < Vy�iO 00Ni1,2222 22222 2222 MMMMM 211-4M MM N00 00000 00000 00000 00000 00000 000 C mlON ',.°53, 4,,T4 27.882 <2T022282 27:1 2222h84'*422288 22020 28O0mlxT W _ � mS WN mWNNpNn9H mNNNR ERRE.? WWWmWE ERE NN� C 28" 8O" 20222 m'a w1y W 2°,8 2 T7-822 !'0 09 2 2 2 8 L1N r V N CCD 1245 M W 8 W MmNB OihEER N17NeQ ORRN o 'MOO OOD!2 N NNNf7 i7MMP P <IinNN W lOoll�A rOW R e _ Mg EERIE MRI REMmI°�' EE mammRi 1211 N.lO�D W W N IO IU N iD 10102 NNUINN vJ W hYlh .. ..i0 .m.O _ h 5.2 1G P 201 7822E m 2MW 82 8228;,7. 10 N28228;,7. NOW 0240082 788 O IV < ti NMMW M COG M 1i 6OiN M m NA N!r pim!tCN Opo >A Y Z aaaaaa m 2222222 7222 WM. O W O A!V 28181! A lM A NhO8O 0222`22 WMWmM82.4' p M Y 1 a • • • • a a a aW ' CRE NOG 2P N m . 2R0000 DooNE228$2 W22mm IE� ranm2c J J'm ` % 2:182 8226`°e°I 3225,5A !Q!lmo 082Tm n2n ro 8P,2 22 Q 8008 812T2 ONWD OOWO 1MQ Ot' 8Nm2' WMm `. O :2:2T,0 7 1220N 87,7"4- 7, NNNNN MNNNN dNNNN NNW a aasa 0000 J n O 0000 - 303333 l :-"t o 66.6060. ... /� O u �0l2 MNlNn W mo "ln vl dPr W W rn!W!M W Mm o �2����Z `V %_ .7022 OWN 28 W W2 !N!WO 222 NW 2.20 2WN " LLUif LL IT W " m8T2 2088 2228 E82<2 2'5228 21827 22p7 t z, ., , 1, ' U N N N N N NNN N N N N N N 82221 N N N N N 224821 N N N , O 0000 i Y d p A:222 092DDWm 288F-8 05,Z227 N 28287 802;2 2n8 N000RR e 5 O a M8GONuoNM20NI2282'VO09N26,..4 f Oio., v b .n.092 22222 88822 2N"222 22222 22222 mRm 10 O L .. C M 1 C N d T (j O N pG pp i = m w711 W WW!W .WnmM ,...-O OD1..— 08.0.9. w..,...D8 0017 �NNBNNN' TO i L W W.1pM W!W AO % pppDb� •'2 �Om pp m�M A uIMONN Q�0e 00 2^P W` m v ' 171O7�M NNNNN 7777 ' i i bq N P .-r !8222 NNN = ! ROD 1G 1G W 3 Y ❑ G 2 a. w N O MEI O Y "Y P logo.- oP m! R22N 2.Wd. . n W22MM M gee m""" T 1 EoUo 7 ^m N. t0 i A. <N.O M !0 0 .O O O M P N .d M 2 0 C C C C[:C C C p 9 U H 1Gr nM n WO Opp 1pp{p p(pp Oi Qp� p�pq 1p�f!< pGMNt� Oi OyM LL .......O M % ed U Mg EmREm m,q ER O1 I§ O,O)Of88 Mr ON O U V U W O O m O 'WWW. ..WWW .WWW. WWW W WWW moo 8 $mI O aaaa¢aa p m 0. ”si, W A S. 1 F y C N >, 2 9=% 0%j -O8NO 22022 1NO P n N N h0'iMN t'V r-8,0-8,2 OO1D iDOt2V 2 oOfOo2W m O a `t o a lcoi ON NMe"i W 6POODpp Oo6gOppA WMW P vim NOD .-.4,..:6�N Mr'A g 22OWD2 22090909 iiEE0 2a009WW 2mm00900'D '§2020209 Wig C! Y ----0=- .L Y Y 0 A = OC�NMo�e g, ❑ YOOO� Y 2 a pp y�Q yp p1D W tpm p_ ppOp� op L Y 888 W NO.oN 22 8 828,7 fOPQm M MMW00 W OO 8 Q C0002f'0OOO a J N N n N <m! N N O !N N N! O M F NNN. 17222(8") MMMMM 81y817882 11yy OM'lggs 18177 VNVC!C'<N< !0 pe 10 CCi ODAt7P0 E .MMM MMMMM 171+fMM0M9 17MMMM M17M 17 mm2, O O Opppff.WWM C 2 N1M7� r W M0 yy O m 2 i 7,'. 2280 2A ONO 8;882 N V A 22 INO AO 0 82 80 222 O Y 2222 22222 22222 22222 22222 12222 222 y m N m U N U i 12.452 ryt222 00822800002.pp2282222 088 5h260 128 082109 QOm 8820- 82820 '88 82$2 M'm20 OaV<V PPe0020P- dPPPP P . PP O mi r- c N o m G.. nj " t° 1 8O C W 6 C rr 22 c D .. Q 111 • STATE OF ALASKA RECEIVED ALASKA OIL AND GAS CONSERVATION CO ISSION MAR 18 2015 WELL COMPLETION OR RECOMPLETION REPORT AND L( GCC la. Well Status: - ®Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended lb. Well Class 20AAC 25.105 20AAC 25.110 0 Exploratory 0 Stratigraphic 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions One . - ® Development 0 Service 2. Operator Name: 5. Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. •2/19/2015 214-153 - 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 '1/21/2015 50-029-23011-01-00 - 4a. Location of Well(Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: •2/14/2015 PBU L-01A _ 2394' FSL, 3660' FEL, Sec. 34,T12N, R11 E, UM 8. KB(ft above MSL): 95 79 15. Field/Pool(s) Top of Productive Horizon: 3408' FSL, 370' FEL, Sec. 34,T12N, R11 E, UM GL(ft above MSL): 48.7' - Prudhoe Bay/Prudhoe Bay - Total Depth: 9. Plug Back Depth(MD+TVD) 5078' FSL, 2970' FEL, Sec. 34, T12N, R11 E, UM 14698' - 9020' - 4b. Location of Well(State Base Plane Coordinates,NAD; 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 583256 . y- 5978116 ' Zone- ASP4 • 14730' - 9023' ADL 028239 - - TPI: x- 586533 y- 5979168 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 583911 y- 5980808 Zone- ASP4 None 18. Directional Surve y: ®Yes ❑ No 19.Water depth, if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD/GR/RES/NEU/DEN, MWD/GR/RES/NEU/DEN, USIT • 2703' - 2558' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 Surface 107' Surface 107' 30" 260 sx Arctic Set(Approx.) 9-5/8" 40# L-80 Surface 2703' Surface 2558' 12-1/4" 450 sx Arctic Set Lite, 208 sx Class'G' 7" 26# L-80 Surface 11034' Surface 8729' 8-3/4" 699 sx LiteCrete,96 sx Class'G',548 sx Class'G' 4-1/2" 12.6# 13Cr85 10867' 14728' 8592' 9023' 6-1/8" Uncemented Sliding Sleeves w/Swell Packers 24. Open to production or injection? ®Yes 0 No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ (MD+TVD of Top&Bottom;Perforation Size and Number): TVD) 4-1/2"Sliding Sleeves w/Swell Packers 4-1/2", 12.6#13Cr85 10874' 10748'/8495' 26. ACID,FRACTURE,CEMENT SQUEEZE, ETC. 11413' 8981' 4 WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ®No - 11591' 9017' Zit 115 12150' 8984' DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 12372' 8969' 2242' Freeze Protect w/78 Bbls Diesel 13106' 8942' -1. `: 13681' 8948' 14258' 8987' 14558' 9010' 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ® No - Sidewall Core(s)Acquired? 0 Yes ® No . If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None ' Form 10-407 Revised 10/2012 /5 f/ CONT NUED ON REVERSE Submit Original Only 1i`T� a / 1 _ RBDMS "` APR 1 0 2015 r 3 29. GEOLOGIC MARKERS(List all formations and rrs encounter 30. FORMATION TESTS NAME TVD Well Tested? Ires ®No Permafrost Top If yes, list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Ugnu 3082' 2842' Schrader Bluff N Sands 5405' 4284' None Schrader Bluff 0 Sands 5658' 4440' Colville Mudstone 6512' 4977' HRZ 7970' 6216' Kalubik 8224' 6427' Kuparuk C 8365' 6542' LCU 8587' 6723' Miluveach 8882' 6966' Kingak 9629' 7577' Sag River 11058' 8749' Shublik A 11107' 8789' Shublik B 11224' 8881' Shublik C 11237' 8890' Shublik D 11277' 8915' Eileen 11304' 8931' Sadlerochit-Zone 4B 11359' 8959' Eileen(Invert) 13427' 8933' Sadlerochit-Zone 4B (Revert) 13570' 8935' Formation at Total Depth: Zone 4B 13501' . 8935' 31.List of Attachment Summary of Daily Drilling Reports, LOT/FIT Summary,Well Schematic Diagram, Surveys,Cement Report 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Troy Jakabosky,564-4868 Email: Troy.Jakabosky@bp.com Printed Name: Joe Lastufke Title: Drilling Technologist Signature: Phone 564-4091 Date:3 111/15 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift, Rod Pump, Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only TREE= 4-1/16'CNV . SA TES: WL ANGLE>70°@ 11419'"""MAX WE LI-EA[ FMC L-01 A ODLO�1a7.2°@ 11231'•"'4-1/2"CHROME TBG 8 ACI1JATOR= BAKER C 0 B.ELEV= 76.7 BE ELEV= /IC KOP 1100': - 1021' -9-5/8'TAM PORT COLLAR Max Angle= 99°Q 12072'- - +; Datum MD= 11246 -#, ' ' t 2259' -4-1/2"FES X NP,ID=3.813' Datum TVD= 8800 ss El= • • 2559' .-1 7-FES ES CH 3sITER 19-5/8'WFIPSTOCK(01/19/15) H 2703' 256T 7'BKR ISO-ZONE ECP,D=6.270' , 9-5/8'CSG,40#,L-80 BTC,D=8.835" -I -'2703' 9 5/6'BKR QSV(01/19/15) - -2724' FALLOUT WINDOW(L-01A) 2703'-2720' Minimum ID = 3.813" @ 2259' I \ GAS LFTMANDRaS 4-1/2" HES X NIPPLE ST MD TVD DEV TY FE VLV LATCH FORT 047E 7 3077 2838 44 KBG-2 CCK-2 BEK - 02/19/15 6 4069 3465 52 KBG-2 DMY BK 0 02/19/15 5 5763 4505 52 KBG-2 DMY BK 0 02/19/15 TOP OF CEMENT - --49()(y WI 4 7169 5507 28 KBG-2 DMY BK 0 02/19/15 3 8326 6510 35 KBG-2 DMY BK 0 02/19/15 2 9483 7458 35 KBG-2 DMY BK 0 02/19/15 C5% 1 10639 8405 35 KBG-2 DMY BK 0 02/19/15 1 10717' 4-1/2'FES X MP,D=3.813 JC t��4 ��t 10748' -I 7'X 4-1/2"HES TNT PKR,D=3.856 1 I' 10785' -4-1/2 FEES X MP,D=3.813" 51 N. 10857 H4-1/2"IF5XNP,D=3.813" 10867' -7'X 5"BKR FBU-E ZXP LTP w/11' IEBACK TOP OF 4-12"LNR - 10867' ?L J"''' SLV,D=4.350" 4-1/2"TBG, 12.6#,13CR-85 VAM TOP, - 10874' 4� ' A V'i +r;, 10874' I--41/2'WLEG,D=3.958' 0152 bpf,D=3.958" 40 -ELMD TT NOT LOGGED T CSG,26#,L-80 VAM TOP HC/BTC-M, -I 11034' �` 1X97' -7'X 5"BKR DG FLEXLOCK HGR,D.4.30' .0383 bpf,D=6.276" ' ' 10901' -5-1/2"X 4-12'X0,0=3.958' 22 '1. Am NJ 4112"SLJDING SLV,ID=3.813" SWELL PAC , • ND DEPTH CYC DATE MN D 8 11413 C 02/17/15 3.813' NO SIZE TOP DEPTH MND . I i2 2 9 41/2' 11304 3.958' 7 11591 C 02/17/15 3.813' 8 4-1/2' 11482 3.958' I I I 6 12150 C 02/17/15 3.813" 5 12372 C 02/17/15 3.813" 7 4-12" 11685 3.958' I. 4 13106 C 02/17/15 3.813' 6 4-1/2' 11983 3.958' 3 13681 C 02/17/15 3.813" 5 4-1/2' 12623 3.958" 2 14258 C 02/17/15 3.813" 4 4-1/2" 12879 3.958" .1. _ 3 4-1/2" 13852 3.958' . . 1 14558 C 02/17/15 3.813" 2 412' 14390 3.958" ._. El 0=OPEN C=CLOSED 1 4-1/2' 14612 3.958' ' I 1 •1.1.11 14876' -4-1/2"BKR SFFT TOOL V ERIRCATION SUB,D=3.91' 4-12"LNR,12.6#, 13CR-86 HYD 521,H 14728' 14898' -4-1/2"BKR ISOLATION VALVE,D=1.00' .0152 bpf,D=3.958" 14 DATE REV BY COP U1TS DATE REV BY COMMENTS PRUDHOE BAY Lilt 07/01101 CHIKAK ORIGINAL COMPLETION WELL: L-01A 02/19/15 PKR 272 SIDETRACK(L-01A) FEF AT No: ' 141530 0224/15 JMD DRLG HO CORRECTIONS AR No: 50-029-23011-01 02125/15. TJ/JAD FNAL ODE AFFROVAL SEC 34,T12R R11E,2392'NSL 8 3659'VVEL BP Exploration(Alaska) 411/ • BP AMERICA ,�` rr LOT / FIT Summary �" Well Name: L-01A Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD-Ft) (TVD-Ft) (ppg) (psi) (BHP) (psi) (ppg) 01/20/15 LOT 2,703.00 2,557.65 9.30 522.00 1,757.65 13.23 02/05/15 FIT 11,078.00 8,725.00 9.00 700.00 4,779.23 10.54 Page 1 of 1 • • North America-ALASKA-BP Page 1 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual©95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft). 1/11/2015 12:00 - 18:00 6.00 RIGD P PRE RIG DOWN IN PREPARATION TO MOVE RIG I-DISCONNECT MUD AND CEMENT LINES -EMPTY DRAINS ON RIG FLOOR -DISCONNECT MUD INTERCONNECTS -CLEAN PITS IN PREPARATION FOR MOVE -PIN FORUM CRANE -PREP RIG FOR MODULE SEPARATION REMOVE BLOCKS FROM TOP DRIVE -HOOK UP BRIDAL LINES -PREP RIG FLOOR TO L/D DERRICK -SECURE PIPE SHED -DISCONNECT INTERCONNECTS BETWEEN ;MODULES *BEGIN RON EVENT AT 12:00 ON 01/11/15 WITH PARKER 273 RIG. 18:00 - 22:00 4.00 RIGD P PRE SKID FLOOR PJSM REMOVE ROOFTOP WALKWAYS -RIG DOWN MANRIDERS AND PREPARE RIG FLOOR -PREPARE PIPE BARN -PERFORM DERRICK INSPECTION SKID RIG FLOOR INTO RIG MOVE POSITION. 22:00 - 00:00 2.00 RIGD P PRE LOWER MAST -PJSM AND LOWER DERRICK CHECKLISTS -LOWER DERRICK -FINAL SLACKOFF WEIGHT ABOVE DERRICK STAND=423 KLBS. 1/12/2015 00:00 - 02:00 2.00 RIGD P PRE PREPARE TO SEPARATE MODULES -PREP TIRES -SWITCH OVER POWER -DISCONNECT FUEL,HYDRAULIC,ELECTRIC LINES 02:00 - 04:30 2.50 RIGD P PRE PREPARE TO MOVE RIG FROM S-09A TO L-01 A -PREP MODULES FOR SEPARATION -WARM UP TIRES -SEPARATE MUD MOD FROM DRILL MOD AND STAGE DOWN PAD 04:30 - 17:30 13.00 RIGD P I PRE MOVE UTILITY AND DRILL MODULES (SIMULTANEOUSLY)FROM S PAD TO L PAD. -STAGE DRILL MODULE BY S PAD I EXTENTION -REMOVE WELL HOUSE FROM S-09A WITH CRANE -SEND WELLHOUSE TO L-01A -MOVE UTILITY MODULE FOLLOWED BY DRILL MODULE FROM S-PAD TO L-PAD 17:30 - 00:00 6.50 RIGD P PRE MOVE MUD MODULE FROM S PAD TOL PAD SIM-OPS ON L PAD WHILE MOVING MUD MOD -TEST RIG MOVE ESD PRIOR TO SPOTTING RIG -SPOT DRILL MODULE OVER WELL L-01A LEVEL AND SHIM DRILL MODULE Printed 2/23/2015 11.31:49AM •North America-ALASKA-BP Page 2 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C.(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM 1 Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual©95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 1/13/2015 00:00 - 03:30 3.50 RIGD P PRE MOVE MUD MODULE FROM S PAD TOL PAD SIM-OPS ON L PAD WHILE MOVING MUD MOD -MOVE UTILITY MODULE INTO PLACE AND MATE UP TO DRILL MODULE '-ELECTRICIAN AND RIG CREW WORKING ON RIGGING UP UM-DM INTERCONNECT RAISE DRIVING CABS. 03:30 08:30 5.00 RIGD P PRE SPOT MUD MODULE ONTO L PAD MOVE MUD MODULE INTO PLACE AND MATE UP -RIG UP INTERCONNECTS -CONNECT STEAM,ELECTRICAL PLUG BOARD,ROOF AND FLOOR PANELS 08:30 - 09:00 0.50 RIGU P PRE SET UPON L PAD, -SETUP SCS TRAILER -RIG CREW SETTING RIG MATS AROUND THE WELL. REMOVE BOOSTER WHEELS -RAISE THE DERRICK,LIFT OFF HEADACHE AT 520K,MAX PULL 536K 09:00 - 12:00 3.00 RIGU P PRE RIG UP PERFORM DERRICK INSPECTION -PERFORM CROWN INSPECTION. -RAISE PIPE CAT -HOOK UP STEAM TO RIG FLOOR -TIE IN INTERCONNECTS "STATE NOTIFICATION PUT IN FOR BOP TEST AT 9:55 AM 12:00 - 16:00 4.00 RIGU P PRE BRIDLE DOWN,HANG&TIE BACK BRIDLE LINES -PSJM INSTALL STAND BUILT MOUSE HOLES I-UNPIN FORUM CRANE -DRAIN CONDENSATE FROM STEAM LINES -UNPIN IDM -HANG RIG TONGS -ATTACH BLOCKS TO TOP DRIVE INSTALL TORQUE TUBE PIN -CALIBRATE DRAVWVORKS 16:00 - 19:00 3.00 RIGU P PRE CONTINUE TO R/U RIG FLOOR -INSTALL ROOFTOP WALKWAYS -RIG UP MUD LINES IN MUD MOD BUILD HANDRAIL AND WALKWAY FROM DRILL MOD TO WELL HOUSE BUILD STAIRS BY UTILITY MOD TO COMPENSATE FOR ELEVATION DIFFERENCE 19:00 - 23:30 4.50 RIGU P PRE CHANGE SAVER SUB XT-39 TO NEW XT-39 -USE NEWALUMINUM GAUGE TOOL -NEW SAVER SUB -FACE TO FACE GAP 2-3/4" -9 TURNS TO MAKEUP I-OLD SAVER SUB -FACE TO FACE GAP 2-1/8" -8 TURNS TO MAKEUP -CALIBRATE TOTCO PIT LEVEL SENSORS -TAKE ON SEAWATER -OPEN RAM DOORS AND INSPECT UPPER RAMS,LOWER RAMS,BLIND RAMS '-CONTINUE TO BUILD STAIRS,HANDRAIL AND WALKWAY FOR ELEVATION DIFFERENCE Printed 2/23/2015 11:31:49AM • North America-ALASKA-BP • Page 3 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date.2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00.00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UVN:500292301100 Active datum:L-01A actual©95.79usft(above Mean Sea Level) Date From-To i Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:30 - 00:00 0.50 RIGU P PRE HOLD RIG EVAC DRILL WITH MARQUESS WRICE CREW -AAR WITH RIG CREW 1/14/2015 00:00 - 00:30 0.50 RIGU P PRE HOLD RIG EVAC DRILL WITH LYLE BUCKLER CREW -AAR WITH RIG CREW 00:30 - 02:30 2.00 BOPSUR P PRE CHANGE OUT UPPER RAMS -REMOVE 2-7/8"X 5-1/2"VBRS AND INSTALL 7"CASING RAMS -REPLACE RUBBER ON ODS BLIND/SHEAR -INSTALL WORK PLATFORM IN AND AROUND WELLHOUSE -TIGHTEN KELLY HOSE **SIMOPS:RIG UP AND PRESSURE TEST HARDLINE TO FLOWBACK TANK 02:30 - 09:30 7.00 RIGU P PRE CHANGE OUT DRILL LINE SPOOL I-C/O WEIGHT INDICATOR SENSOR SPOOL NEW DRILL LINE THROUGH SHEAVES AND WRAP OLD DRILL LINE ON DRAVWVORKS DRUM —UNSPOOL OLD DRILL LINE AND SEND DOWN TOOL CRANE -SPOOL NEW DRILL LINE ON DRUM -REPLACE DEAD LINE ANCHOR -FUNCTION CROWN SAVER -CALIBRATE WEIGHT INDICATOR AS PER QUADCO **SIMOPS:CONTINUE BUILDING WALKWAY IN AND AROUND WELLHOUSE **RIG ACCEPTED AT 9:30 AM 1/14/2015 09:30 - 12:00 2.50 DHB P DECOMP PRESSURE TEST TWC -250 PSI LOW/3500 PSI HIGH FOR 5 MIN EACH FROM ABOVE AND BELOW:GOOD TESTS 12:00 - 15:00 3.00 WHSUR P DECOMP NIPPLE DOWN TREE -DRAIN TREE AND REMOVE AS PER FMC -REMOVE BLOCK HANGING LINES -INSPECT HANGER THREADS.THREADS GOOD -MAKEUP 4-1/2"NSCT XO TO HANGER,7-1/2" TURNS,FULL ENGAGEMENT **WELLBORE BARRIERS PRIOR TO NIPPLE DOWN TREE 1-TESTED TWC -TESTED CEMENT PLUG I-ANNULAR VALVE,TUBING PACKOFF 15:00 - 21:30 6.50 BOPSUR P DECOMP NIPPLE UP BOP -PJSM -N/U HIGH PRESSURE RISER N/U BOP —INFLATE AIR BOOTS FOR BELL NIPPLE AND FLOW LINE -INSTALL HOLE FILL&R/U BELL NIPPLE -INSTALL MOUSE HOLE Printed 2/23/2015 11:31:49AM • North America-ALASKA-BP S Page 4 of 55 ice. Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:30 - 23:30 2.00 BOPSUR P DECOMP RIG UP TO TEST BOP'S -UTILIZE PRESSURE CROSSCHECK LIST PRIOR TO TESTING -TEST BOP ACCORDING TO AOGCC,BP REGULATIONS AND PARKER PROCEDURES -M/U 4"TEST JOINT ASSEMBLY FILL STACK � PURGE AIR FROM SYSTEM -PERFORM BODY TEST -CHECK FOR LEAKS • STATE NOTIFICATION PUT IN FOR BOP TEST AT 9:55 AM 1/13/14 WITNESS WAIVED BY AOGCC REP JOHN CRISP 23:30 - 00:00 0.50 RIGU P DECOMP PRE-SPUD MEETING -HELD PRE-SPUD MEETING WITH BOTH CREWS DISCUSSED WELL CONSTRUCTION AND OBJECTIVES OF L-01A 1/15/2015 00.00 - 05:30 5.50 BOPSUR P DECOMP PRESSURE TEST BOP'S -UTILIZE PRESSURE CROSSCHECK LIST PRIOR TO TESTING -TEST BOP ACCORDING TO AOGCC,BP REGULATIONS AND PARKER PROCEDURES 1-TEST ANNULAR WITH 4"TEST JOINT TO 250 PSI LOW,3500 PSI HIGH,5 MINS CHARTED -REST OF BOPE TESTS TO 250 PSI LOW, 3500 PSI HIGH FOR 5 MINUTES CHARTED lEACH -TEST VBRS WITH 4"AND 4-1/2"TEST JOINTS -TEST 7"CASING RAMS WITH 7"TEST JOINT 1-PERFORM ACCUMULATOR DRAWDOWN 'TEST -ALL TESTSCHARTED,ARTED,SEE ATTACHED BOP TEST CHARTS 05:30 - 06:30 1.00 BOPSUR P DECOMP j,RIG DOWN FROM BOP TEST -RIG DOWN TEST JOINTS -BLOW DOWN SURFACE LINES AND MANIFOLD 06:30 - 08:30 2.00 RIGU P DECOMP RIG UP LUBRICATOR -P/U AND INSTALL DUTCH RISER -P/U AND INSTALL LUBRICATOR -PRESSURE TEST TO 250 PSI LOW,3500 PSI HIGH FOR 5 MIN CHARTED 08:30 - 10:00 1.50 DHB P DECOMP PULL TWO WAY CHECK -SEAL ROLLED OFF CHECK VALVE i I -RIG DOWN LUBRICATOR AND DUTCH RISER **WELLBORE BARRIERS AFTER PULLING TWC -TESTED CEMENT PLUG -TESTED BOPS 10:00 - 11:00 1.00 PULL P DECOMP CIRCULATE OUT FREEZE PROTECT PJSM -PUMP SEAWATER DOWN TUBING,TAKING r DIESEL RETURNS INTO TIGER TANK -PUMP DEEP CLEAN SWEEP PLUS SURFACE TO SURFACE VOLUME OF 160 BBLS -9 BPM,1248 PSI Printed 2/23/2015 11:31.49AM P • North America-ALASKA-BP • Page 5 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 12:30 1.50 PULL P DECOMP PULL HANGER TO RIG FLOOR -PICK UP LANDING JOINT -BACK OUT LOCK DOWN SCREWS -PULL TUBING HANGER FREE WITH 68K,33K STRING WEIGHT 12:30 - 13:00 0.50 PULL P DECOMP CIRCULATE BOTTOMS UP 1.5X -8 BPM,235 PSI MONITOR WELL FOR 10 MINUTES:WELL STATIC 13:00 - 18:30 5.50 PULL P DECOMP POH ON ELEVATORS FROM 2975'MD TO SURFACE -UD TUBING HANGER -P/U=65K S/O=65KAT 2800'MD -MUD WEIGHT:8.5 PPG IN,8.5 PPG OUT :-72 JTS,1 X-NIPPLE.1 CUT PIECE 3.6'LONG, FLARE=4-3/4" -MONITOR DISPLACEMENT VIA TRIP TANK PROPER DISPLACEMENT **FALSE H2SALARM IN SHAKER ROOM **ALARM WAS SPRAYED WITH WATER, SETTING IT OFF **NO H2S VERIFIED IN SWEEP WITH 'HANDHELD MONITOR **NOTIFICATION TO BP SUPERINTENDANT MADE 18:30 - 19:30 1.00 PULL P DECOMP RIG DOWN DOYON CASING EQUIPMENT 1-CLEAN AND CLEAR RIG FLOOR -RIG DOWN TONGS AND MANDREL SLIPS 19:30 - 20:00 0.50 PULL P DECOMP RIG SERVICE -LUBRICATE RIG -GREASE TOP DRIVE AND BLOCKS 20:00 - 21:00 1.00 RIGU P. DECOMP RIG UP TO RUN E-LINE -BRING TOOLS INTO PIPE SHED -BRING EQUIPTMENT TO RIG FLOOR -SPOT TRUCK 21:00 - 00:00 3.00 BOPSUR N RREP DECOMP TROUBLESHOOT HYDRAULICS IN ACCUMULATOR -DETERMINED HYDRAULIC OIL LEAKING OUT ANNULAR PREVENTOR IN STACK -NOTIFIED BP SUPERINTENDENT,WTL,ODE -DETERMINED PLAN FORWARD WITH BP SUPERINTENDENT,WTL,ODE MOBILIZE HANGER STYLE TEST PLUG FROM TOOL SERVICES -WAIT ON TEST PLUG AND FMC 4-RIG DOWN AND RELEASE E-LINE 1/16/2015 00:00 - 02:00 2.00 BOPSUR N RREP DECOMP INSTALL TEST PLUG SET TEST PLUG INTO TUBING SPOOL -RUN IN LOCK DOWN SCREWS PER FMC REP **4.75"BACKED OUT,3.75"RAN IN,450 FT-LBS TEST FROM BELOW PLUG TO 250 PSI LOW, 3500 PSI HIGH FOR 5 MIN,CHARTED **WELLBORE BARRIERS AFTER INSTALLING TEST PLUG -TESTED CEMENT PLUG TESTED TEST PLUG Printed 2/23/2015 11:31:49AM • North America-ALASKA-BP • Page 6 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual©95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:00 - 05:00 3.00 BOPSUR N RREP DECOMP RIG DOWN LOW PRESSURE EQUIPMENT IN BOP DECK -PJSM -PULL MASTER BUSHINGS NIPPLE DOWN LOW PRESSURE RISER -NIPPLE DOWN BELL-NIPPLE -DE-ENERGIZE AND ISOLATE ANNULAR HYDRAULIC CONTROL LINE -REMOVE CAP FROM SHAFFER ANNULAR PREVENTER 05:00 - 09:00 4.00 BOPSUR N RREP DECOMP TROUBLESHOOT HYDRAULICS IN ANNULAR PREVENTER -REMOVE RUBBER ELEMENT -REMOVE ADAPTER RING -REMOVE PISTON 09:00 - 12:00 3.00 BOPSUR N RREP DECOMP REPAIR ANNULAR PREVENTER REMOVE OLD ELEMENT AND PISTON VIA RIG FLOOR -DAMAGE FOUND ON THE MAIN PISTON BODY(ADAPTER ID) DAMAGE FOUNDON THE ADAPTER RING -CLEAN ANNULAR HOUSING MOVE NEW ELEMENT AND PISTON INTO 'PLACE -INSTALL UPPER AND LOWER PISTON ID SEALS -INSTALL UPPER AND LOWER PISTON OD SEALS 12:00 - 20:30 8.50 BOPSUR N RREP DECOMP CONTINUE ANNULAR PREVENTER REPAIR INSTALL UPPER AND LOWER ADAPTER ID SEALS -INSTALL ADAPTER OD SEAL -INSTALL NEWANNULAR PISTON INTO ANNULAR HOUSING -INSTALL NEW ADAPTER RING -INSTALL NEW ANNULAR ELEMENT -INSTALL AND TORQUE CAP ONTO SHAFFER ANNULAR PREVENTER -FUNCTION TEST ANNULAR HYDRAULICS "SIMOPS:BUILD 4"DRILL PIPE STANDS OFFLINE 20:30 - 21:30 1.00 BOPSUR N RREP DECOMP NIPPLE UP LOW PRESSURE RISER -INSTALL DUTCH RISER ADAPTER -NIPPLE UP LOW PRESSURE RISER/AIR BOOT -NIPPLE UP BELL NIPPLE 21:30 - 22:30 1.00 BOPSUR N RREP DECOMP PRESSURE TEST ANNULAR PREVENTOR -UTILIZE PRESSURE CROSSCHECK LIST PRIOR TO TESTING -TEST ANNULAR ACCORDING TO AOGCC,BP REGULATIONS AND PARKER PROCEDURES -TEST ANNULAR WITH 4"TEST JOINT TO 250 PSI LOW,3500 PSI HIGH,5 MINS CHARTED CHART ATTACHED Printed 2/23/2015 11:31:49AM • North America-ALASKA-BP • Page 7 of 55 Operation Summary Report ..._.. .._.............. Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date , From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:30 - 23:00 0.50 BOPSUR N RREP DECOMP RETRIEVE FMC TEST PLUG -MONITOR IA PRESSURE,0 PSI BELOW TEST PLUG -BACK OUT LOCK DOWN SCREWS PER FMC REP **4.75"BACKED OUT,3.75"RAN IN,450 FT-LBS -UNSEAT AND PULL FMC TEST PLUG `**WELLBORE BARRIERS AFTER PULLING FMC TEST PLUG I-TESTED CEMENT PLUG -TESTED BOPS 23:00 - 00:00 1.00 WHSUR P ' DECOMP INSTALL WEAR RING -CLEAN AND CLEAR RIG FLOOR -INSTALL WEAR RING ID=7-1/8" -SPOT SCHLUMBERGER E-LINE UNIT -BRING E-LINE TOOLS ONTO RIG FLOOR 1/17/2015 00:00 01:00 1.00 RIGU P DECOMP RIG UP SCHLUMBERGER E-LINE PJSM,COVERED RIG UP AND SIMOPS DURING OPERATION -BRING TOOLS INTO PIPE SHED ENSURE E-LINE SHEAVE ARE PLACED OUT OF IDM TRAVEL PATH -CONNECT AIRLINE WIPER SIMOPS -BUILD 4"DP STANDS WITH OFFLINE STAND BUILDER 01:00 - 01:30 0.50 CLEAN P DECOMP MAKEUP AND RUN GAUGE RING/JUNK BASKET -RUN IN HOLE WITH 5.75"GAUGE RING/ JUNK BASKET(USIT OD:4.6") I-LOST COMMUNICATIONS WITH TOOL AT 100' MD POOH TO TROUBLESHOOT SIMOPS -BUILD 4"DP STANDS WITH OFFLINE STAND 4 BUILDER 01:30 - 03:30 2.00 CLEAN I N DFAL DECOMP TROUBLESHOOT E-LINE E-LINE HEAD FLOODED OUT,SHORT CIRCUIT TOOL -RE-HEAD E-LINE WITH BACK UP SIMOPS -BUILD 4"DP STANDS WITH OFFLINE STAND BUILDER 03:30 - 05:30 2.00 CLEAN P DECOMP 'RUN GAUGE RING/JUNK BASKET I-RUN IN HOLE WITH 5.75"GAUGE RING/ JUNK BASKET(USIT OD:4.6") -TAGGED 4.5"TUBING STUB AT 3,020'ELMD -FIRST 7"COLLAR AT 2,986'ELMD -ALL 40'SPACING BETWEEN COLLARS FROM 2,986'ELMD TO 2,400'ELMD POOH WITH GAUGE RING/JUNK BASKET LAYDOWN GAUGE RING/JUNK BASKET SIMOPS -BUILD 4"DP STANDS WITH OFFLINE STAND BUILDER Printed 2/23/2015 11:31:49AM North America-ALASKA-BP I Page 8 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) ' Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:OOAM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:30 - 12:00 6.50 CLEAN P DECOMP USIT LOG 7"CASING -MAKE UP AND RUN IN HOLE WITH USIT/MSIP/CCUGR(USIT OD:4.6")TO 2,990' ELMD -LOG FROM 2,990'MD TO SURFACE AT 30 FT/MIN -REPEAT USIT PASS FROM 2,830'ELMD TO -"900'ELMD PULL OUT OF HOLE AND LAYDOWN USIT 'TOOL -RIG DOWN E-LINE E I *TOC 2,775'ELMD(INTERPRETATION BY GERARDO CEDILLO) SIMOPS -BUILD 4"DP STANDS WITH OFFLINE STAND _ BUILDER 12:00 - 12:30 0.50 CLEAN P , DECOMP RIG DOWN SCHLUMBERGER E-LINE -PJSM -SEND E-LINE TOOLS OUT TOOL CRANE DOOR -CLEAN AND CLEAR RIG FLOOR 12:30 - 13:30 1.00 CUT P DECOMP ,RIG UP TO RUN MULTI-STRING CUTTER INSTALL 4"PS-21 INSERTS -CHANGE OUT 4.5"YC ELEVATORS TO 4"BX ELEVATORS -DRILLER AND AD VERIFY ELEVATORS PROPER SIZE FOR 4"XT-39 DP 13:30 - 17:00 3.50 CUT, P DECOMP RIH WITH MULTI-STRING CUTTER FROM 0' MD TO 2,751'MD -RIH ON ELEVATORS WITH 4"DP FROM DERRICK -P/U=72K S/O=72K @ 2600'MD -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT -LOCATE 7"COLLARS AT 2,739'MD AND 2,782' MD -PICK UP TO 2,751'MD AND START CUT -3 BPM,350 PSI,1.5K TORQUE -6 BPM,750 PSI,2-3K TORQUE -PICK UP AFTER CUT,10K OVERPULL TO PULL FREE -RIH,STACK 10KAT CUT INDICATING CASING SHIFT 17:00 - 18:00 1.00 CUT P DECOMP CIRCULATE OUT DEAD CRUDE TO OPEN TOP TANK 6 BPM,750 PSI -PUMP 30 BBL HIGH VISC SWEEP WITH 1 DRUM DEEP CLEAN -FOLLOWED BY HEATED SEAWATER SURFACE TO SURFACE 18:00 - 20:00 2.00 CUT P DECOMP PULL OUT OF HOLE WITH MULTI STRING CUTTER ASSEMBLY -MONITOR WELL FOR 10 MIN:WELL STATIC -POOH ON ELEVATORS FROM 2,751'MD TO SURFACE P/U=72K S/O-72K AT 2600'MD -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT Printed 2/23/2015 11:31:49AM 4111 • North America-ALASKA-BP Page 9 of 55 f Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:00 - 21:00 1.00 PULL P DECOMP PULL WEAR RING -DRAIN STACK -BACK OUT LOCKDOWN SCREWS PER FMC **4.75"BACKED OUT,3.75"RAN IN,450 FT-LBS -PULL WEAR RING -VERIFY OA PRESSURE 0 PSI 21:00 - 22:00 1.00 PULL P DECOMP "RIG UP TO PULL 7"CASING RIG UP DOYON CASING TONGS -CHANGE OUT PS-21 INSERTS WITH BOWL INSERTS 22:00 - 23:30 1.50 PULL P DECOMP PICKUP 7"SPEAR -PJSM WITH BAKER REP -MAKE UP 7"CASING SPEAR -RIH WITH SPEAR AND ENGAGE CASING -MAKE UP TO TOP DRIVE BLEED OFF PACK OFF VOID -BACK OUT LOCKDOWN SCREWS ON 7" CASING SPOOL PER FMC REP **4.75"BACKED OUT,3.75"RAN IN,450 FT-LBS 23:30 - 00:00 0.50 PULL P DECOMP UNSEAT 7"CASING HANGER -UNSEAT HANGER AT 117 K LL-PICK UP WEIGHT ONCE FREE 107K 1/18/2015 00:00 - 01:30 1.50 PULL P DECOMP PULL AND LAY DOWN 7"CASING HANGER -PULL 7"CASING HANGER AND CASING PACKOFF TO RIG FLOOR CIRCULATE 2X BOTTOMS UP -CIRCULATE HEATED SEAWATER -PUMP AT 8 BPM AND 150 PSI MONITOR WELL FOR 10 MINUTES:WELL STATIC -DISENGAGE SPEAR AND LAY DOWN -4'PUP BELOW HANGER ON TALLY ACTUALLY 1.5' -BREAKOUT MANDREL HANGER AND LAYDOWN 01:30 - 06:00 4.50 PULL P DECOMP PULL 7""26#,L-80,BTC-M CASING -PSJM WITH DOYON,PARKER,BP -PULL CASING FROM 2,751'MD TO SURFACE -LAY DOWN 40'JOINTS IN PIPE SHED -LAY DOWN 65 FULL JOINTS -CUT JOINT=11.9' -PIPE WAS IN COMPRESSION WHEN CUT -THICK DEAD CRUDE COATING ON JOINTS 1-61 1-JOINTS62-66 PULLED CLEAN -CASING IN GOOD CONDITION,NO NOTICEABLE ISSUES NO CEMENT STRINGERS MONITOR TRIP VIATRIP TANK-PROPER DISPLACEMENT 06 00 - 08.00 2.00 PULL P DECOMP RIG DOWN FROM 7"CASING PULL RIG DOWN DOYON CASING TONGS -CHANGE OUT ELEVATOR INSERTS FROM 7" TO 4"DP INSERTS -DRILLER AND AD VERIFY INSERT DIAMETER -CLEAN AND CLEAR RIG FLOOR Printed 2/23/2015 11:31:49AM • North America-ALASKA-BP • Page 10 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual Q95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:00 - 10:00 I 2.00 CLEAN P DECOMP BRING 9-5/8"CLEANOUT BHA TO RIG FLOOR -BRING 3 MILLS AND BUMPER SUB TO RIG FLOOR -INSTALL WEAR RING ID:9.875"PER FMC REP "4.75"BACKED OUT,3.75"RAN IN 10:00 - 14:30 4.50 CLEAN P DECOMP MAKE UP 9-5/8"CLEAN-OUT ASSEMBLY -MAKE UP BHA#3 -8-3/4"BIT,8-3/8"LOWER WATERMELON MILL,(2)8-3/4"UPPER WATERMELON MILL, 4-1/2"FLOAT SUB,6-1/4"BOWEN BUMPER SUB,1 JT 5"HWDP,(9)6-1/2 DRILL COLLARS, j(15 JTS)5"HWDP,XO TO 4"XT39 • -OALOFBHA =814.34 FT -TIGHT SPOT AT 217'MD,15K DOWN 14:30 - 16:00 1.50 CLEAN P DECOMP RIH WITH 9-5/8"CLEAN-OUT ASSEMBLY -RIH WITH 4"DP FROM DERRICK -RIH FROM 814'MD TO 2,751'MD -MUD WEIGHT:8.5 PPG IN,8.5 PPG OUT -P/U=107K,S/0=98K AT 2600'MD -TAG 7"CASING STUB AT 2,751'MD WITH 3K DOWN PICKUP 10'TO CIRCULATE '-MONITOR WELL VIA TRIP TANK PROPER DISPLACEMENT 16:00 - 17:00 1.00 CLEAN P DECOMP CIRCULATE 2.5X BOTTOMS UP RECIPROCATE FROM 2,741'TO 2,715'MD PUMP 40 BBLS DEEPCLEAN PILL '-PUMP HEATED SEAWATER AT 550 GPM AND 900 PSI -DEAD CRUDE COMING BACK OVER SHAKERS '-SHUT DOWN PUMPS AND MONITOR WELL FOR 10 MIN:WELL STATIC 17:00 - 20:00 3.00 CLEAN P DECOMP PULL OUT OF HOLE WITH 95/8"CLEAN-OUT ASSEMBLY -POOH ON ELEVATORS FROM 2,741'MD'TO SURFACE -P/U=107'K,S/0=98'KAT 2500'MD TIGHT SPOT AT 215-224'MD,15K UP,20K DOWN WORK THRU MULTIPLE TIMES -TIGHT SPOT AT 215-224'MD,15K UP,20K DOWN -WORK THRU MULTIPLE TIMES -215-224'MD,10K UP,15K DOWN -DISCUSS WITH ODE -MUD WEIGHT:8.5 PPG IN,8.5 PPG OUT -MONITOR TRIP VIA TRIP TANK PROPER DISPLACEMENT -FLOW CHECK WELL PRIOR TO PULLING BHA INTO STACK 20:00 - 22:30 2.50 CLEAN P DECOMP LAY DOWN 9-5/8"CLEAN-OUT ASSEMBLY PJSM PRIOR TO PULLING HWDP INTO STACK -RACK BACK 5"HWDP CONTINUE RACKING BACK HWDP AND DC L/D MILLS -MILLS IN GAUGE Printed 2/23/2015 11:31:49AM North America-ALASKA-BP • Page 11 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22.30 - 23:00 0.50 CLEAN P DECOMP RIG SERVICE -LUBRICATE RIG I-GREASE BLOCKS,CROWN AND WASHPIPE, CHECK OIL LEVELS IN TDS-11 -CLEAN AND CLEAR RIG FLOOR 23.00 - 00:00 1.00 STWHIP P DECOMP RIG UP HALLIBURTON E-LINE -PJSM,COVERED RIG UP AND SIMOPS DURING OPERATION BRING TOOLS INTO PIPE SHED 1-ENSURE E-LINE SHEAVE ARE PLACED OUT 'OFIDM TRAVEL PATH CONNECT AIRLINE WIPER SIMOPS -BUILD 4"DP STANDS WITH OFFLINE STAND 'BUILDER 1/19/2015 00:00 - 02:00 2.00 STWHIP P DECOMP MAKE UP AND RUN GAUGE RING/JUNK BASKET/CCL/GR -RIH WITH JUNK BASKET/GAUGE RING(8.28" OD) -GAUGE RING 8.28"OD,EZSV IS 7.75"OD -TAG 7"CASING STUB AT 2,749'ELMD -FIRST COLLAR SEEN AT 2,689'ELMD POOH FOR EZSV RUN -LAYDOWN GAUGE RING/JUNK BASKET 02:00 - 04:30 2.50 STWHIP P DECOMP MAKE UP AND RUN EZSV/CCL/GR -RIH WITH EZSV/GR/CCL ON E-LINE FROM SURFACE TO 2,729'ELMD -PULL UP AND SET EZSV AT 2,720'ELMD -TOP EZSV SET 31'ELMD BELOW 2,689' ELMD CASING COLLAR -GOOD INDICATION OF SET -PULL OUT OF HOLE WITH E-LINE _ -LAY DOWN FIRING HEAD 04:30 - 05:30 1.00 STWHIP P t DECOMP I PRESSURE TEST 9-5/8"CASING AND EZSV CLOSE BLIND RAMS I-PRESSURE TEST 250 PSI LOW FOR 5 MIN AND 3500 PSI HIGH FOR 30 CHARTED MINUTES,PASSING TEST -PUMPED 3.3 BBLS,BLEED BACK 3.3 BBLS -NOTIFY WTL AND OBTAIN PERMISSION TO PROCEED Printed 2/23/2015 11:31:49AM North America-ALASKA-BP S Page55 12 of // ,'•Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 I Spud Date/Time:6/8/2001 12:00:00AM I Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual©95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:30 - 08:30 3.00 BOPSUR P DECOMP CHANGE OUT 7"CASING RAMS TO 2-7/8"X 5-1/2"VARIABLES 11-DRAIN STACK i-PULL WEAR RING -CLOSE BLIND RAMS -CHANGEOUT UPPER RAM CAVITY FROM 7" CASING RAMS TO 2-7/8"X 5-1/2"VARIABLES INSTALL TEST PLUG -PRESSURE TEST 250 PSI LOW FOR 5 MIN AND 3500 PSI HIGH FOR 5 CHARTED MINUTES WITH 4"TEST JOINT -PASSING TEST -CHART ATTACHED -INSTALL WEAR RING **BARRIERS FOR CHANGEOUT -TESTED BLIND RAMS -TESTED EZSV -TESTED 9-5/8"CASING **DISCUSSED WITH ODE AND DECIDED TO RUN MORE FLEXIBLE STRING WITHOUT WATERMELON MILLS TO PASS WHIPSTOCK ASSEMBLY THRU TIGHT SPOT AT 220'MD 08:30 - 12:00 3.50 STWHIP P DECOMP MAKEUP WHIPSTOCK BHA -PJSM WITH BAKER REP -MAKE UP BHA#5 -9-5/8"BOTTOM TRIP ANCHOR,9-5/8"GEN II WHIPSTOCK SLIDE,8-1/4"WINDOW MILL,1 JT HWDP,FLOAT SUB,MWD WITH CROSS OVERS,6-1/4"DRILL COLLARS(9),HWDP(15), XO TO 4-1/2"IF X 4"HT38 -55K SHEAR BOLT -OAL OF BHA:841.06' 12:00 - 15:00 3.00 STWHIP P DECOMP RUN IN HOLE WITH 9-5/8"WHIPSTOCK ASSEMBLY -RIH FROM SURFACE TO 2,704'MD -TIGHT SPOT AT 220'MD,4K S/O I-P/U 107 K,S/O 101 KAT 2,704'MD RIH ON 4"DP FROM DERRICK I-FILL PIPE EVERY 15 STANDS I-450 GPM,575 PSI -MONITOR TRIP VIA TRIP TANK-PROPER DISPLACEMENT 15:00 - 15:30 0.50 STWHIP P DECOMP SET WHIPSTOCK -ORIENT WHIPSTOCK TO 48 DEGREES LEFT USING MWD AS PER DD -TAG EZSV 2,724'MD -P/U 107K,S/O 101K -SET WHIPSTOCK PER BAKER REP -S/O 17K TO SET ANCHOR P/U 15K OVER STRING WEIGHT TO CONFIRM ANCHOR SET -S/O 53K AND SHEAR WINDOW MILL OFF WHIPSTOCK SLIDE PROJECTED WINDOW:TOW 2,703',BOW 2,720'MD,2,558'TVD Printed 2/23/2015 11:31.49AM • North America-ALASKA-BP • Page 13 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 .X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual t95.79usft(above Mean Sea Level) Date From-To Hrs 1 Task Code NPT NPT Depth Phase Description of Operations (hr) 1 (usft) 15:30 - 16:30 1.00 STWHIP ; P DECOMP PULL OUT OF HOLE WITH BHA#4 WHIPSTOCK RUNNING ASSEMBLY -POOH ON ELEVATORS FROM 2,724'MD'TO i 841'MD ' 1-RACK BACK 4"DP IN DERRICK -P/U=107K,S/O=101 K AT 2724'MD -NO TIGHT SPOTS SEEN COMING OUT OF HOLE -MUD WEIGHT:8.5 PPG IN,8.5 PPG OUT -MONITOR TRIP VIA TRIP TANK:PROPER ' DISPLACEMENT 16:30 - 18:00 1.50 STWHIP P DECOMP LAY DOWN BHA#4 WHIPSTOCK RUNNING ASSEMBLY -POOH ON ELEVATORS FROM 841'MD TO SURFACE -FLOW CHECK WELL PRIOR TO PULLING BHA INTO STACK -SWAP OUT PS-21 INSERTS AND BX ELEVATORS.INSERTS !-VERIFIED USING CALIPER BY AD AND i DRILLER -RACK BACK HWDP IN DERRICK ' MUD WEIGHT:8.5 PPG IN,8.5 PPG OUT -MONITOR TRIP VIA TRIP TANK PROPER DISPLACEMENT 18:00 - 18:30 0.50 STWHIP P DECOMP RIG SERVICE -GREASE TOPDRIVE,CROWN,BLOCKS, ST-80 CLEAN AND CLEAR RIG FLOOR i-, ------- -. 18:30 - 22:00 3.50 EVAL X DPRB 220.00 1 DECOMP WAIT ON SLICK LINE AND 40 ARM CALIPER I TO MOBILIZE TO RIG CHANGE IN SCOPE TO RUN 40 ARM CALIPER IN 9-5/8"CASING TO DETERMINE IF SUBSIDENCE INDUCED BUCKLING IN TIGHT SPOT AT 220'MD SIMOPS I 1 -BUILD 4"DP STANDS WITH OFFLINE STAND BUILDER 22:00 - 00:00 2.00 EVAL C 220.00 DECOMP 1 RIG UP SCHLUMBERGER SLICK LINE -PJSM,COVERED RIG UP AND SIMOPS DURING OPERATION 1 -BRING TOOLS INTO PIPE SHED i -ENSURE SHEAVES ARE PLACED OUT OF IDM TRAVEL PATH rt 1/20/2015 00:00 03:00 3.00 EVAL C 220.00 DECOMP !RUN 40 ARM CALIPER/CCL/GR -LOG WITH 40 ARM CALIPER/GR/CCL ON 'SLICK LINE FROM 2,600'MD TO SURFACE -LAY DOWN 40 ARM CALIPER/CCL/GR PER j PDS REP i __ i -RIG DOWN SLICK LINE Printed 2/23/2015 11:31:49AM • North America-ALASKA-BP • X, Page 14 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) ; Start Date:1/11/2015 End Date:2/16/2015 'X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time'6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code I NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 05:30 2.50 STWHIP P DECOMP MAKE UP BHA#5 9-5/8"MILLING ASSEMBLY MAKE UP BHA#5 PER BAKER REP -8-1/2"WINDOW MILL,8-3/8"LOWER WATERMELON MILL,(2)8-3/4"UPPER WATERMELON MILL,4-1/2"FLOAT SUB,6-1/4" BOWEN BUMPER SUB,1 JT 5"HWDP,(9)6-1/2 DRILL COLLARS,(15 JTS)5"HWDP,XO TO 4" XT39 OAL OF BHA =806.15 FT -CHANGE OUT PS-21 BOWL INSERTS FOR SLIP INSERTS -CHANGE OUT BX INSERTS FOR 4"DP I INSERTS ID VERIFIED BY AD AND DRILLER TIGHT SPOT AT 215'MD,18K S/O 05:30 - 06.30 1.00 STWHIP P DECOMP rRUN IN HOLE WITH BHA#59-5/8"MILLING ASSEMBLY -RIH FROM 806'TO 2,703'MD -RIH ON 4"DP FROM DERRICK FILL PIPE EVERY 15 STANDS MONITOR TRIP VIA TRIP TANK-PROPER I DISPLACEMENT -MUD WEIGHT:8.5 PPG IN,8.5 PPG OUT TAGGED TOP OF THE WHIPSTOCKAT 2,003' -MD 06:30 - 08:00 1.50 STWHIP P DECOMP DISPLACE WELL FROM 8.5 PPG SEAWATER TO 9.3 PPG LSND I-425 GPM,505 PSI -OBTAIN SPR'S 08:00 - 16:30 8.50 STMILL P WEXIT MILL 9-5/8"CASING WINDOW -MILL WINDOW IN 9-5/8"CASING PER BAKER REP MILL FROM 2,703"MD TO 2,734'MD P/U=105K,S/O=99K,ROT=101K -420 GPM,500 PSI -90 RPM,3-10K TORQUE,3K WOB -MONITOR AND CLEAN DITCH MAGNETS -PUMP 50 BBL HIGH VIS SWEEP -MINIMAL CUTTINGS RETURNED -PULL INTO WINDOWAND FLOWCHECK WELL PRIOR TO LOT(STATIC) I � TOP OF WINDOW=2,703'MD,2,558'TVD MIDDLE WINDOW=2,711'MD, 2,564'TVD BOTTOM WINDOW=2,720'MD, 2,571'TVD 16:30 - 18:00 1.50 STMILL P WEXIT PERFORM LEAK-OFF TEST -MUD WEIGHT:9.3 PPG,2,558'TVD -PUMP 1.20 BBLS AT 0.5 BPM AND PRESSURE BREAKS OVER AT 522 PSI I-BLEED BACK 0.8 BBLS EMW 13.22 PPG -DISCUSS LOT WITH ODE -OBTAIN WTLAUTHORIZATION Printed 2/23/2015 11:31.49AM • North America-ALASKA-BP • Page 15 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Firs Task Code NPT I NPT Depth Phase Description of Operations 18:00 19:00 1.(r) usft) 00 STMILL P WEXIT I PULL OUT OF THE HOLE WITH 8 1/2"MILLING ASSEMBLY I-POOH ON ELEVATORS FROM 2,734'MD TO 806'MD P/U 105K,S/O 99KAT 2,737'MD POOH STANDING BACK 4"DP IN DERRICK -MONITOR TRIP VIA TRIP TANK:PROPER DISPLACEMENT -MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT -FLOW CHECK WELL PRIOR TO PULLING BHA INTO STACK:STATIC 3K OVER PULLLAT-215'MD 19:00 - 21:00 2.00 STMILL P WEXIT LAY DOWN8-1/2"MILLING BHA -CLOSE ANNULAR PREVENTER -CHANGE OUT SLIP SEGMENTS -LAY DOWN 6-1/4"DRILL COLLARS -RACK BACK 5"HWDP -LAY DOWN BOT MILLING ASSEMBLY CLEAN AND CLEAR RIG FLOOR MILL GAUGE WEAR: WINDOW MILL-1/4"UNDER GAUGE LOWER STRING MILL- 1/4"UNDER GAUGE UPPER MILL 1-1/4"UNDER GAUGE I UPPER MILL 2-IN GAUGE 21:00 - 22:00 1.00 DRILL P INTI 'FLUSH AND FUNCTION BOPS -DRAIN STACK -M/U BOP CLEANING TOOL TO 1 STAND OF 4" DP I-WASH AND JET BOPS DOWN PAST WELLHEAD -FUNCTION TEST ALL BOP COMPONENTS 22:00 - 22:30 0.50 DRILL P INTI RIG SERVICE -GREASE TOP DRIVE,BLOCKS,IDM,ST-80, ELEVATORS,SLIPS 22:30 - 00:00 1.50 DRILL P INTI j MAKE UP 8-3/4" DRILLING ASSEMBLY I-BRING SLB SUBS AND X/O'S TO THE RIG FLOOR -DRILLER AND AD CONFIRM ALL LIFT SUBS CALIPERED AND PROPER SIZE FOR 5" I ELEVATOR INSERTS MAKE UP MOTOR BHA#6 PER SLB -8-3/4"MILLED TOOTH BIT,6-3/4"PDM,N/M STAB,ECOSCOPE LWD,TELESCOPE 675 MWD,IN LINE STABILIZER, (3)NM FLEX COLLAR,FLOAT SUB, (15 JTS)5"HWDP, I HYDRAULIC JARS,(5 JTS)5"HWDP,XO TO 4" XT-39 OAL OF BHA:836.48 FT Printed 2/23/2015 11:31:49AM North America-ALASKA-BP • Page 16 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 1X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. WWI:500292301100 Active datum:L-01A actual t95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 1/21/2015 00:00 - 02:00 2.00 DRILL P INTI CONTINUE MAKING UP8-3/4"DRILLING 'ASSEMBLY MAKE UP MOTOR BHA#6 PER SLB P/U FLEX COLLARS AND JARS FROM PIPE SHED -SCRIBE MOTOR TO MWD FOR OFFSET I-8-3/4"MILLED TOOTH BIT,6-3/4"PDM,N/M !STAB,ECOSCOPE LWD,TELESCOPE 675 MWD,IN LINE STABILIZER, (3)NM FLEX COLLAR,FLOAT SUB, (15 JTS)5"HWDP, HYDRAULIC JARS,(5 JTS)5"HWDP,XO TO 4" XT-39 OAL OF BHA:836.48 FT NO DRAG SEEN AT-215'MD WHILE MAKING UP BHA 02:00 - 04:00 2.00 DRILL P INTI RIH WITH 8-3/4"MOTOR-BHA#6 -RUN IN HOLE FROM 836'TO 2,737'MD -RIH ON ELEVATORS WITH 4"DP FROM DERRICK MONITOR TRIP VIA TRIP TANK-PROPER DISPLACEMENT -MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT 04:00 - 12:00 8.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 2,737'MD TO 3,172 MD(2,904'TVD) I-ORIENTATE MOTOR 48 DEGREE LEFT PRIOR TO EXITING WINDOW -ESTABLISH BASELINE ECD AS PER MWD -550 GPM,1455 PSI ON,1400 PSI OFF -40 RPM,4K TORQUE ON,3K TORQUE OFF -P/U=104K,S/O=98K ROT 97K ECD:ACTUAL=10.05 PPG,CALC=9.9 PPG MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT -SURVEY EVERY-30 FT -ACTUAL ROTATE TIME:1.51 HRS -ACTUAL SLIDE TIME:2.7 HRS CLAY CUTTINGS,COAL COMING BACK ACROSS THE SHAKERS ENCOUNTERED HYDRATES PRIOR TO DRILLING INTO THE UG4 12:00 - 17:30 5.50 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 3,172'MD TO 3,390 MD(3,025'TVD) -550 GPM,1400 PSI ON,1350 PSI OFF -40 RPM,4K TORQUE ON,3K TORQUE OFF -P/U=112K,S/O=95K ROT 97K -ECD:ACTUAL=10.05 PPG,CALC=9.9 PPG MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT -SURVEY EVERY-30 FT -ACTUAL ROTATE TIME:0.61 HRS -ACTIAL SLIDE TIME:2.2 HRS -PUMPED TANDEM HIGH VIS(110 VIS)AND WEIGHTED LOW VIS(10.8 PPG)SWEEP SIGNIFICANT AMOUNT OF CUTTINGS RETURNED 17:30 - 19:00 1.50 DRILL P INTI I POH ON ELEVATORS FROM 3,390'MD TO 836' MD -MONITOR WELL FOR 10 MINUTES:WELL STATIC -MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT P/U=112K,S/O=95K AT 3,390'MD -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT Printed 2/23/2015 11:31:49AM SNorth America-ALASKA-BP S Page 17 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 23:30 4.50 DRILL P INTI LAY DOWN 8-3/4"MOTOR BHA#6 -MONITOR WELL PRIOR TO PULLING HWDP INTO STACK:WELL STATIC -PJSM PRIOR TO LAYING DOWN BHA -RACK BACK HWDP AND FLEX COLLARS INTO DERRICK -LAY DOWN BHA#6 PER SLB DD/MWD BIT GRADE:0-0-NO-A-E-BHA MONITOR WELL VIA TRIP TANK:GOOD DISPLACEMENT CLEAN AND CLEAR RIG FLOOR 23:30 - 00:00 0.50 DRILL P INTI RIG SERVICE GREASE TOP DRIVE,BLOCKS,IDM,ST-80, ELEVATORS,SLIPS 1/22/2015 00:00 - 00:30 0.50 ; DRILL P INTI INSPECT SAVER SUB -11 CONNECTIONS MADE SINCE NEW -PULL CLAMP CYLINDER HINGE PIN -CLEAN PIN CONNECTION -PROFILE GAUGE:NO SHARP EDGES,TIGHT THREAD TO GAUGE PROFILE -ALUMINUM BOX GAUGE:9 TURNS TO MAKE UP 00:30 - 02:30 2.00 DRILL P INTI MAKE UP 8-3/4"POWER DRIVE ROTARY STEERABLE BHA#7 -PJSM -MAKE UP RSS#7 PER SLB DD -LOAD SOURCE PER SLB MWD -DRILLER AND AD CONFIRM ALL LIFT SUBS CALIPERED AND PROPER SIZE FOR 5" ELEVATOR INSERTS -8-3/4"PDC BIT,6-3/4"PDX6 RSS,PD E-MAG RECEIVER,PD FLEX COLLAR,ECOSCOPE LWD,6-3/4"TELESCOPE,8-5/8"NM STABILIZER,(3 JNTS)NM FLEX COLLAR, FLOAT SUB,(15 JNTS)5"HWDP,HYDRAULIC JARS,(5 JNTS)5:HWDP,CROSS OVER SUB, (72 JNTS)4"XT-39 DP,8-3/4"GHOST REAMER, 4"XT-39 DP -NO DRAG SEEN AT-215'MD WHILE MAKING UP BHA 02:30 - 06:00 3.50 DRILL P INTI RIH WITH 8-3/4"POWER DRIVE ROTARY STEERABLE BHA#7 RUN IN HOLE FROM 836'TO 3,390'MD ;-RIH ON ELEVATORS WITH 4"DP FROM DERRICK -FILL PIPE EVERY 15 STANDS -MONITOR TRIP VIA TRIP TANK-PROPER DISPLACEMENT I-MUD WEIGHT:9.3 PPG IN,9.3 PPG -PICK UP 8-3/4"GHOST REAMER AT 3,110'MD -NO ISSUES GETTING BHA THROUGH WINDOW Printed 2/23/2015 11:31:49AM • North America-ALASKA-BP • Page 18 of 55 Operation Summary Report _____.......... Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 12:00 6.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 3,390'MD TO 4,253 MD(3,573'TVD) -ESTABLISH BASELINE ECD AS PER MWD -550 GPM,1730 PSI -150 RPM,6K TORQUE ON,5K TORQUE OFF -P/U=119K,5/0=94K ROT 100K -ECD:ACTUAL=10.23 PPG,CALC=10.05 PPG -MUD WEIGHT:9.3 PPG IN,9.4 PPG OUT SURVEY EVERY-90 FT -ACTUAL ROTATE TIME:4.13 HRS 12:00 - 23:30 11.50 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 4,253'MD TO 5,468 MD(4,331'TVD) -550 GPM,2080 PSI -150 RPM,8K TORQUE ON,7K TORQUE OFF P/U=141K,S/0=101 K ROT 112K -ECD:ACTUAL=10.3.PPG,CALC=10.13 PPG -MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT -SURVEY EVERY-90 FT -ACTUAL ROTATE TIME:7.77 HRS -PUMPED 10.8 PPG WEIGHTED SWEEP AT 4,450'MD,MINIMAL INCREASE IN CUTTINGS RETURNED PUMPED 10.8 PPG WEIGHTED SWEEP AT 5,150'MD,.MODERATE INCREASE IN CUTTINGS RETURNED 23:30 - 00:00 0.50 DRILL P INTI RIG SERVICE -GREASE TD,BLOCKS,WASHPIPE,ST-80, IDM 1/23/2015 00:00 - 06:00 6.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 4,253'MD TO 6,100 MD -550 GPM,2145 PSI -170 RPM,8K TORQUE ON,7K TORQUE OFF -P/U=142,S/0=103K,ROT=115K -SURVEY EVERY-90 FT -ECD:ACTUAL=10.31 PPG,CALC=10.08 PPG -MUD WEIGHT:9.3 PPG IN,9.3 PPG OUT -PUMPED 10.8 PPG 25 BBL WEIGHTED SWEEP AT 5,700'MD,MINIMAL INCREASE IN CUTTINGS -STARTED BLEEDING IN SPIKE FLUID AT 5,800'MD FOR PLANNED WEIGHT UP Printed 2/23/2015 11:31:49AM • North America-ALASKA-BP • Page 19 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual(g95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 12:00 6.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 6,100'MD TO 6,530(4,988'TVD) -550 GPM,2810 PSI I-170 RPM,7K TORQUE ON,6K TORQUE OFF P/U=145K,5/0=108K,ROT=119K -ECD:ACTUAL=11.46 PPG,CALC=11.10 PPG -1-SURVEY EVERY-90 FT BACKREAM 90'STANDS FOR ECD MANAGEMENT LIMIT ROP TO 125 FT/HR FOR ECD MANAGEMENT -MUD WEIGHT:10.3 PPG IN,10.4 PPG OUT -PUMPED LOW VIS/HIGH VIS SWEEP AT 6,430'MD,MODERATE INCREASE IN CUTTINGS -LOWER ROP TO 100 FT/HR FOR ECD ,MANAGEMENT I-DOUBLE BACKREAM STANDS AT 6,500'MD -LOWER ROP TO 75 FT/HR FOR ECD MANAGEMENT ACTUAL ROTATE TIME:7.82 HRS -DISCUSS WITH ODE.NEW ECD LIMITATION .1'1.7 PPG 12:00 - 23:30 11.50 DRILL P INTI "DRILL 8-3/4"INTERMEDIATE HOLE FROM 6,530'MD TO 7,235'MD(5,565'TVD) -545 GPM,2915 PSI 150 RPM,8K TORQUE ON,7K TORQUE OFF -P/U=164K,5/0=119K,ROT=119K -ECD:ACTUAL=11.44 PPG,CALC=11.21 PPG -SURVEY EVERY-90 FT -BACKREAM 90'STANDS FOR ECD MANAGEMENT I-MUD WEIGHT:10.4 PPG IN,10.5 PPG OUT -SCREEN UP FROM 170 TO 200 -PUMPED LOW VIS/HIGH VIS SWEEP AT 7,000'MD,MINIMAL INCREASE IN CUTTINGS -LOWER ROP TO 80-100 FT/HR FOR ECD MANAGEMENT ACTUAL ROTATE TIME:7.2 HRS 23:30 - 00:00 0.50 DRILL P INTI RIG SERVICE -GREASE TD,BLOCKS,WASHPIPE,ST-80, IDM 1/24/2015 00:00 - 06:00 6.00 DRILL P ' INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM '7,235'MD TO 7,575'MD(5,870'TVD) -550 GPM,2970 PSI -150 RPM,8K TORQUE ON,7K TORQUE OFF -P/U=180K,S/0=125K,ROT=137K -ECD:ACTUAL=11.50 PPG,CALC=11.23 PPG -SURVEY EVERY-90 FT -BACKREAM 90'STANDS FOR ECD MANAGEMENT -INCREASE ROP TO 100-150 FT/ MINAS ECD ALLOWS -MUD WEIGHT:10.5 PPG IN,10.5 PPG OUT STARTED MUD DILUTION AT 7,300'MD PRIOR TO ENTERING THE HRZ -PUMP HIGH VIS SWEEP AT 7,575'MD,10% INCREASE IN CUTTINGS -ACTUAL ROTATE TIME:4.01 HRS Printed 2/23/2015 11:31:49AM • North America-ALASKA-BP • Page 20 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 1 End Date:2/16/2015 X3-015PL-C (9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM ,Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT 1 NPT Depth Phase ! Description of Operations (hr) (usft) 06:00 - 12:00 6.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 7,235'MD TO 7,954'MD(6,204'TVD) 1-545 GPM,3215 PSI -170 RPM,9K TORQUE ON,7K TORQUE OFF -P/U=185K,S/0=125K,ROT=143K ECD:ACTUAL=11.62 PPG,CALC=11.33 !PPG SURVEY EVERY-90 FT -BACKREAM 90'STANDS FOR ECD MANAGEMENT ,-MUD WEIGHT:10.6 PPG IN,10.6 PPG OUT SCREEN DOWN FROM 200 TO 170 -ACTUAL ROTATE TIME:3.9 HRS 12:00 - 23:30 11.50 DRILL • P • INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 7,954'MD TO 8,709'MD(6,823"TVD) •-540 GPM,3420 PSI -170 RPM,11-12K TORQUE ON,9K TORQUE OFF -P/U=206K,5/0=128K,ROT=148K -ECD:ACTUAL=11.56 PPG,CALC=11.33 PPG • -SURVEY EVERY-90 FT -BACKREAM 90'STANDS FOR ECD _MANAGEMENT -MUD WEIGHT:10.6 PPG IN,10.6 PPG OUT -ACTUAL ROTATE TIME:8.31 HRS 1-PUMP 20 BBL LOW VIS,20 BBL HIGH VIS I SWEEP AT 8,150'MD,10%INCREASE IN CUTTINGS -PUMP 20 BBL LOW VIS,20 BBL HIGH VIS SWEEP AT 8,650'MD,15%INCREASE IN CUTTINGS I "SIMOPS:BUILD 4"DP STANDS OFFLINE 23:30 00:00 0.50 DRILL P INTI RIG SERVICE -CHECK OIL IN TOP DRIVE -GREASE WASH PIPE,BLOCKS AND ROLLERS,PS-21/ST-80,CROWN CLUSTER -VISUALLY INSPECT SAVER SUB,NO SHARP THREADS 1/25/2015 00:00 - 06:00 6.00 DRILL P INTI I DRILL 8-3/4"INTERMEDIATE HOLE FROM 8,709'TO 9,185'MD '-545 GPM,3500 PSI -170 RPM,12 TORQUE ON,10K TORQUE OFF -P/U=218K,S/0=127K,ROT=153K -ECD:ACTUAL=11.62 PPG,CALC=11.33 PPG ,-SURVEY EVERY-90 FT -BACKREAM 90'STANDS FOR ECD MANAGEMENT -80-120 FT/HR AS ECD ALLOWS I-MUD WEIGHT:10.6 PPG IN,10.65 PPG OUT • PUMP 20 BBL LOW VIS/20 BBL HIGH VIS :SWEEP AT 8,700'MD,10%INCREASE IN I CUTTINGS 1-ACTUAL ROTATE TIME:4.21 HRS Printed 2/23/2015 11 31:49AM • North America-ALASKA-BP • Page 21 of 55 ; r E Operation Summary Report Common Well Name L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date.2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 I Spud DateTme:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 12:00 6.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 9,185'TO 9,566'MD(7,510 TVD) -545 GPM,3610 PSI -150 RPM,14K TORQUE ON,12K TORQUE OFF -P/U=235K,S/O=129K,ROT=155K -ECD:ACTUAL=11.55 PPG,CALC=11.31 PPG -SURVEY EVERY-90 FT BACKREAM 90'STANDS FOR ECD MANAGEMENT -80-100 FT/HR AS ECD ALLOWS -MUD WEIGHT:10.6 PPG IN,10.65 PPG OUT -PUMP 20 BBL LOW VIS/20 BBL HIGH VIS SWEEP AT 9,200'MD,20%INCREASE IN CUTTINGS -ACTUAL ROTATE TIME:4.21 HRS 12:00 - 23:30 11.50 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 19,566'TO 10,440'MD(8,237 ND) -545 GPM,4000 PSI -150 RPM,14K TORQUE ON,13K TORQUE OFF P/U=246K,S/O=139K,ROT=166K i ECD:ACTUAL=11.45 PPG,CALC=11.32 PPG -SURVEY EVERY-90 FT -BACKREAM 90'STANDS FOR ECD MANAGEMENT I-80-100 FT/HR AS ECD ALLOWS ,-MUD WEIGHT:10.6 PPG IN,10.65 PPG OUT SCREEN UP FROM 170 TO 200 -PUMP 20 BBL LOW VIS/20 BBL HIGH VIS SWEEP AT 9,600'MD,10%INCREASE IN CUTTINGS -PUMP 20 BBL LOW VIS/20 BBL HIGH VIS SWEEP AT 10,225'MD,5%INCREASE IN CUTTINGS -INCREASE LUBE CONCENTRATION FROM 1.0%TO 1.5%FOR TORQUE MANAGEMENT -ACTUAL ROTATE TIME 8.01 HRS 23:30 - 00:00 0.50 DRILL P INTI RIG SERVICE -CHECK OIL LEVELS IN TOP DRIVE -GREASE BLOCKS/WASHPIPE,CROWN CLUSTER,PS21/ST-80/BX ELEVATORS -VISUALLY INSPECT SAVER SUB,NO SHARP THREADS Printed 2/23/2015 11.31:49AM • North America-ALASKA-BP S Page 22 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 1/26/2015 00:00 - 06:00 6.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 10,440'TO 10,800'MD(8,537'TVD) -545 GPM,4125 PSI -150 RPM,17 TORQUE ON,14K TORQUE OFF -P/U=255K,S/0=142K,ROT=173K -ECD:ACTUAL=11.55 PPG,CALC=11.32 PPG SURVEY EVERY-90 FT -BACKREAM 90'STANDS FOR ECD 'MANAGEMENT -80-120 FT/HR AS ECD ALLOWS -MUD WEIGHT:10.6 PPG IN,10.65 PPG OUT -PUMP 20 BBL LOW VIS/20 BBL HIGH VIS SWEEP AT 10,700'MD,5%INCREASE IN CUTTINGS -INCREASE LUBE CONCENTRATION FROM 1.5%TO 2.0%FOR TORQUE MANAGEMENT 06:00 - 08:00 2.00 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 10,800'TO 10,930'MD(8,644'TVD) -545 GPM,41-25 PSI -100 RPM,14 TORQUE ON -P/U=257K,S/0=142K,ROT=166K -ECD:ACTUAL=11.57 PPG,CALC=11.32 -PPG -SURVEY EVERY-90 FT BACKREAM 90'STANDS FOR ECD MANAGEMENT 90 FT/MIN MUD WEIGHT:10.6 PPG IN,10.65 PPG OUT CROSSED FAULT#3 AT 10,786'MD(8,525' TVD),NO LOSSES -CROSSED THE TJB AT 10,844'MD(8,573' TVD) DRILL TO 11,051'MD(8,637'TVD)AND CIRCULATE FOR SAMPLES 08:00 - 10:30 2.50 DRILL P INTI DRILL 8-3/4"INTERMEDIATE HOLE FROM 110,930'TO 11,051'MD(8,742'TVD) -HOLD DRILLING PARAMETERS CONSTANT, LOOKING FOR REVERSE DRILLING BREAK -545 GPM,3960 PSI -100 RPM,14.5K TORQUE ON,14K TORQUE OFF -WOB:7K ECD:ACTUAL=11.36 PPG,CALC 11.32 PPG -MUD WEIGHT:10.6 PPG IN,10.65 PPG OUT -NO REVERSE DRILLING BREAK SEEN 10:30 - 12:00 1.50 DRILL P INTI CIRCULATE BOTTOMS UP -CIRCULATE BOTTOMS UP LOOKING FOR GLAUCONITE SAMPLES -RECIPROCATE PIPE 60'MD -550 GPM,4045 PSI 1-100 RPM,14.5K TORQUE ON -MUD WEIGHT:10.6 PPG IN,10.65 PPG OUT Printed 2/23/2015 11:31:49AM • North America-ALASKA-BP Page 23 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:OOAM Rig Release: Rig Contractor PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 17:30 5.50 DRILL P INTI DRILL AHEAD 5'MD AS PER CASING PICK PROCEDURE DRILL AHEAD 2.5'FT TO 11,053.5'MD(8,744' TVD) HOLD DRILLING PARAMETERS CONSTANT, LOOKING FOR REVERSE DRILLING BREAK -545 GPM,4000 PSI -100 RPM,14.5K TORQUE ON -WOB:7K -GAMMA RAY START TO INCREASE -STOP,CIRCULATE BOTTOMS UP FOR SAMPLES -DRILL AHEAD 4.5'MD PER GEO -HOLD DRILLING PARAMETERS CONSTANT, LOOKING FOR REVERSE DRILLING BREAK -545 GPM,4000 PSI -100 RPM,14.5K TORQUE ON -WOB:7K -ROP DROPPED TO LESS THAN 5 FT/HR STOPED AT 11,058'MD(8,748'TVD) CIRCULATE BOTTOMS UP FOR SAMPLES GLAUCONITE CONFIRMED IN SAMPLES .-CALL TOWN GEO,ODE TO DISCUSS -DECISION TO CALL TD MADE **TOTAL OF 7 BOTTOMS UP CIRCULATED DURING TSGR PICK 17:30 - 00:00 6.50 DRILL P INTI PUMP OUT OF THE HOLE FROM 11,058'TO 8,520'MD -OBTAIN SPR -MONITOR WELL FOR 10 MINUTES PRIOR TO PULLING OFF BOTTOM -86 GPM,250 PSI AT 10,900'MD -P/U 270K,S/O 135K AT 10,900'MD -MUD WEIGHT:10.6 PPG IN,10.65 PPG OUT MAX TRIP SPEED AT 66 FT/MIN SAW THREE TIGHT SPOTS AT 10,400'MD, 10,200'MD,AND 10,100'MD -PULLED 30K THROUGH EACH AND WIPED CLEAN 1/27/2015 00:00 - 00:30 0.50 DRILL P INTI RIG SERVICE -CHECK OIL LEVELS IN TOP DRIVE -GREASE BLOCKS/WASHPIPE,CROWN CLUSTER,PS21/ST-80/BX ELEVATORS -VISUALLY INSPECT SAVER SUB,NO SHARP THREADS 00:30 - 02:00 1.50 DRILL P INTI PUMP OUT OF THE HOLE FROM 8,520'TO 7,940'MD -86 GPM,250 PSI -P/U 270K,S/O 135K -MUD WEIGHT:10.6 PPG IN,10.65 PPG OUT -MAX TRIP SPEED AT 60 FT/MIN Printed 2/23/2015 11:31:49AM North America-ALASKA-BP Page 2a of ss Operation Summary Report Common Well Name:L-01 AFE No Event Type.RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 IX3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time.6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual(095.79usft(above Mean Sea Level) Date From-To Hrs Task I Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:00 - 06:00 4.00 DRILL P INTI WIPER TRIP TO 9-5/8"WINDOW WITH 8-3/4" DRILLING BHA -POOH ON ELEVATORS FROM 7,940'MD TO 2,605'MD PER WELL PROGRAM TRIPPING SPEEDS -P/U=198K,S/0=111 K AT 7,940'MD -POOH STANDING BACK 4"DP IN DERRICK MONITOR TRIP VIA TRIP TANK PROPER DISPLACEMENT MUD WEIGHT:10.6 PPG IN,10.6 PPG OUT -MONITOR WELL FOR 10 MINUTES:SLIGHT SEEPAGE LOSSES(1-2 BBL/HR) -LAYDOWN GHOST REAMER -1/8"UNDER GAUGE,1/2"UNDER GAUGE TOWARDS THE BOTTOM -CIRCULATE BOTTOMS UP X2 06.00 - 07.00 1.00 DRILL P INTI CIRCULATE 2X BOTTOMS UP -450 GPM,1230 PSI 80 RPM,3-4K TORQUE -P/U=97K,S/O=88KAT 2,636'MD -NO SIGNIFICANT CUTTINSG RETURNS 07.00 - 09:00 2.00 BOPSUR P INTI PULL WEAR RING PJSM WITH FMC REP MONITOR WELL FOR 10 MINUTES:SLIGHT SEEPAGE LOSSES(1-2 BBL/HR) -MAKE UP WEAR RING RUNNING TOOL INTO STRING -LATCH INTO WEAR RING -PULL LOCKDOWN SCREWS -PULL WEAR RING TO SURFACE AND BREAK OUT OF STRING -MAKE UP TUBING HANGER STYLE TEST PLUG INTO STRING -LAND TEST PLUG AND RUN IN LOCKDOWN SCREWS -P/U=96K,S/O=93K 09:00 - 10:00 1.00 BOPSUR P INTI RIG UP TO TEST BOPS -MAKE UP VALVE ASSEMBLY AND PUMP IN SUB INTO TOP DRIVE -RUN IN TEST JOINT -BLED AIR FROM TEST EQUIPMENT 10.00 - 17:30 7.50 BOPSUR P INTI PJSM,TEST 13-5/8",4 PREVENTER BOP AND RELATED EQUIPMENT -TEST BOP ACCORDING TO AOGCC REGULATIONS AND PARKER PROCEDURES -TEST ANNULAR WITH 4"TEST JOINT TO 250 PSI LOW,3500 PSI HIGH,5 MINS CHARTED -TEST VBRS WITH 4"AND 4-1/2"TEST JOINTS. NO FAILURES TO REPORT -SEE ATTACHED DOCUMENTATION CHUCK SCHEVE OF AOGCC WAIVED WITNESS OF BOP TEST MONITORED HOLE FILL WITH SECONDARY KILL LINE CONNECTED TO I/A. MAINTAINED COLUMN OF FLUID ON KILL LINE BY RUNNING CHARGE PUMP AND KEEPING BLEEDER VALVE ON MUD PUMP OPEN TO ACTIVE PITS. -2 BBL/HR LOSSES DURING TEST Printed 2/23/2015 11:31:49AM • North America-ALASKA-BP • Page 25 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay I Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:OOAM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 18:30 1.00 BOPSUR P INTI RIG DOWN TEST EQUIPMENT -BLOW DOWN TEST LINES -RIG DOWN LINES AND EQUIPMENT -CLEAN AND CLEAR RIG FLOOR -STAGE EQUIPMENT TO PULL TEST PLUG AND SET WEAR RING INSPECT SAVER SUB -PULL CLAMP CYLINDER HINGE PIN CLEAN PIN CONNECTION -PROFILE GAUGE:NO SHARP EDGES -ALUMINUM BOX GAUGE:8-3/4 TURNS TO MAKE UP,2-3/4"FACE TO FACE MEASUREMENT 18:30 - 19:30 1.00 BOPSUR P INTI PJSM WITH FMC REP TO PULL TEST PLUG AND SET WEAR RING -BACK OUT LOCK DOWN SCREWS -PULL TEST PLUG -MAKE UP WEAR RING PULLING TOOL INTO STRING , -SET WEAR RING -P/U=96K,S/O=93K,1/4 TURN TO THE LEFT -RUN IN LOCKDOWN SCREWS PULL TOOL TO SURFACE AND BREAK OUT OF STRING 19:30 - 20:00 0.50 DRILL P INTI SERVICE TOP DRIVE -CHECK OIL -CHANGE OUT WASH PIPE -GREASE ST-80,PS-21,BLOCKS,ROLLERS 20:00 - 21:00 1.00 DRILL P INTI CIRCULATE BOTTOMS UP -CBU PRIOR TO RUNNING IN TO OPEN HOLE -PUMP 2500 STROKES -300 GPM AT 650 PSI SHUT DOWN AND MONITOR WELL WELL IS STATIC 21:00 - 00:00 3.00 DRILL P INTI RUN IN HOLE WITH 8-3/4"RSS DRILLING ASSEMBLY -RIH W/4"DRILL PIPE FROM DERRICK ON ELEVATORS -BREAK CIRCULATION EVERY 15 STANDS -RIH FROM 2,500'MD TO 6,800'MD 1 24 HR LOSSES=91 BBLS 1/28/2015 00:00 - 03:00 3.00 DRILL P INTI RUN IN HOLE WITH 8-3/4"RSS DRILLING I ASSEMBLY FROM 6,800'MD RIH W/4"DRILL PIPE FROM DERRICK ON ELEVATORS -BREAK CIRCULATION EVERY 15 STANDS -RIH TO 11,010'MD -P/U 160K,S/O 104K AT 6,950'MD Printed 2/23/2015 11'31:49AM • North America-ALASKA-BP • Page 26 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay I Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:OOAM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual©95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 04:00 1.00 DRILL P INTI MAKE UP TOP DRIVE,PREPARE TO WASH TO TD 1-STAGE PUMPS UP SLOWLY 47 GPM,620 PSI,2%FLOW 101 GPM,727 PSI,8%FLOW 190 GPM,1111 PSI,12%FLOW 295 GPM,1911 PSI,15%FLOW 420 GPM,3054 PSI,17%FLOW CIRCULATE AT 420 GPM FOR 20 MINS UNTIL PRESSURE DECREASES TO DRILLING PRESSURE WASH DOWN TO TD AT 530 GPM P/U 290K,5/0 140K AT 11,050'MD 04:00 - 12:00 8.00 DRILL P INTI CIRCULATE AND CONDITION MUDATTD -CBU AT 11,058'MD,8,748'TVD -RECIPROCATE-80 FT,ROTATE AT 80-120 RPM,12-16 K TORQUE PUMP AT 545 GPM, ICP:4320 PSt,FCP:3960 PSI 18%FLOW,11.5 ACTUAL ECD I CIRCULATE 3 BOTTOMS UP 4-OBSERVE LARGE SHALE SPLINTERS AT SHAKERS POSSIBLE POSSIBLE SHALE INSTABILITY DISCUSS WITH ODE -APPROVAL TO WEIGHT UP MUD FROM 10.7 PPG TO 11.0 PPG 12:00 - 13:30 1.50 DRILL P INTI INCREASE MUD WEIGHT -CIRCULATE BOTTOMS UP WHILE WEIGHTING UP MUD SYSTEM -PUMP AT 545 GPM,4100 PSI -RECIPROCATE-80 FT,ROTATE AT 150 RPM, 16 K TORQUE MW IN&OUT=11.0 PPG 13:30 - 20:00 6.50 DRILL P INTI PUMP OUT OF THE HOLE FROM 11,058'TO 7940' MD(THRZ)FOR WIPER TRIP -MONITOR WELL FOR 10 MINUTES PRIOR TO PULLING OFF BOTTOM -PUMP OUT OF HOLE:86 GPM,250 PSI MAX TRIP SPEED AT 60 FT/MIN P/U 270K,S/O 135K AT 11,050'MD P/U 200K,S/O 118K AT 7940'MD 20:00 - 23:00 3.00 DRILL P INTI CIRCULATE 3 BOTTOMS UP ABOVE THRZ -CONFIRM SHALE STABILITY -CBU AT 450 GPM,2450 PSI PER SLB DD -RACK BACK 1 STAND EVERY 30 MINIS -ROTATE AT 80 RPM,8 K TORQUE AFTER 3 BOTTOMS UP OBSERVE SMALL SHALE PIECES ACROSS SHAKERS VOLUME OF CUTTIINGS DIMINISH WITH EACH 'CBU FLOW CHECK WELL 10 MINS PRIOR TO RBIH -WELL IS STATIC Printed 2/23/2015 11:31:49AM x . S Common Well Name:L-01 AFE No Event Type.RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date.2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No..PARKER 273 Spud Date/Time:6/8/2001 12:00:OOAM Rig Release Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23.00 - 00:00 1.00 DRILL P INTI RUN IN HOLE WITH 8-3/4"RSS FROM 7,700' MD TO 9,275'MD - RIH W/4"DRILL PIPE FROM DERRICK ON ELEVATORS BREAK CIRCULATION EVERY 15 STANDS -P/U 225K,S/O 118K AT 9,275'MD MONITOR WELL VIA TRIP TANK-SEEPAGE LOSSES 24 HR LOSSES=19 BBLS 1/29/2015 00:00 - 01.00 1.00 DRILL P INTI RUN IN HOLE WITH 8-3/4"RSS DRILLING ASSEMBLY FROM 9,275'MD -RIH W/4"DRILL PIPE FROM DERRICK ON ELEVATORS BREAK CIRCULATION EVERY 15 STANDS -RIH TO 11,010'MD P/U 225K,S/O 118KAT 9,275'MD MW IN&OUT=11.0 PPG 01:00 - 01:30 0.50 DRILL P INTI MAKE UP TOP DRIVE, WASH TO TD -STAGE PUMPS UP SLOWLY 87 GPM,280 PSI,2%FLOW 136 GPM,664 PSI,10%FLOW 175 GPM,774 PSI,11%FLOW 245 GPM,1160 PSI,12%FLOW 390 GPM,2480 PSI,13%FLOW 450 GPM,3190 PSI,13%FLOW WASH DOWN TO TD AT 450 GPM P/U 290K,S/O 140K AT 11,050'MD 01:30 - 04:00 2.50 DRILL P INTI CIRCULATE 3 TIMES BOTTOMS UP AT TD -CBU AT 11,058'MD,8,748'TVD -RECIPROCATE--80 FT,ROTATE AT 100 RPM, 15 K TORQUE -PUMP AT 450 GPM, 3130 PSI PER SLB DD AFTER BOTTOMS UP -OBSERVE VERY SMALL SHALE PIECES ACROSS SHAKERS VOLUME OF CUTTIINGS DIMINISH WITH EACH CBU MINIMAL CUTTINGS RETURNED AFTER 3RD CBU MW IN&OUT=11.0 PPG 10 BBL/HR LOSSES WHILE PUMPING 04:00 - 09:00 5.00 DRILL P INTI PUMP OUT OF HOLE FROM TD TO TOP HRZ (7,970'MD) -LAY IN 40 BBL DRILL AHEAD PILL AT 35#/BBL -LAY IN AT 85 GPM,270 PSI&PULL OUT OF HOLE -TRIP OUT OF HOLE AT 60 FT/MIN ENCOUNTER 30K OVER PULL AT 10,035'MD -WIPE THROUGH TWICE WITH NO OVERPULL AFTER WIPING MONITOR WELL FOR 10 MINS AT THRZ:WELL IS STATIC Printed 2/23/2015 11:31:49AM g J,. North America ALASKA SP "•r, f 8 f55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date.1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:OOAM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual©95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 12:30 3.50 DRILL P INTI PULL OUT OF HOLE WITH 8-3/4"DRILLING BHA IN PREPARATION TO RUN 7"26# LONGSTRING -POOH ON ELEVATORS FROM 7,940'MD TO 2,705'MD PER WELL PROGRAM TRIPPING .SPEEDS -P/U=195K,S/0=120KAT 7,950'MD POOH STANDING BACK 4"DP IN DERRICK -MONITOR TRIP VIA TRIP TANK:PROPER DISPLACEMENT MUD WEIGHT:11 PPG IN,11 PPG OUT 12:30 - 13:30 1.00 DRILL P INTI PULL BHA#7 INTO 9-5/8"WINDOWAT 2,711' MD -CIRCULATE BOTTOMS UP AT WINDOW '540 GPM,1975 PSI MUD WEIGHT IN/OUT:11.0 PPG MONITOR WELL FOR 10 MINUTES:STATIC 13:30 - 14:30 1.00 DRILL P INTI PULL OUT OF HOLE WITH 8-3/4"DRILLING BHA FROM 9-5/8"WINDOW -POOH ON ELEVATORS FROM 2,705'MD PER WELL PROGRAM TRIPPING SPEEDS POOH STANDING BACK 4"DP IN DERRICK -MONITOR TRIP VIA TRIP TANK.PROPER DISPLACEMENT -MUD WEIGHT:11 PPG IN,11 PPG OUT -MONITOR WELL 10 MINS PRIOR TO PULLING BHA THROUGH BOP WELL IS STATIC 14:30 - 18:30 4.00 DRILL P INTI PJSM WITH SLB TO LAY DOWN RSS DRILLING ASSEMBLY,BHA#7 -CHANGE OUT PS-21/BX ELEVATOR INSERTS -AD CALIPER INSERTS&DRILLER VERIFY -LAY DOWN BHA#7 PER SLB DD/MWD -RACK BACK 6 STANDS OF 5"HWDP -STAGE BHA#7 OFF OF RIG FLOOR -CLEAN AND CLEAR RIG FLOOR -BIT GRADE:2-2-BT-A-X-I-WT-TD 10 BROKEN CUTTERS 18:30 - 20:30 2.00 BOPSUR P INTI PJSM CHANGE OUT UPPER PIPE RAMS -DRAIN STACK -CLOSE BLIND SHEARS -DE-ENERGIZE ACCUMULATOR -CHANGE OUT UPPER PIPE RAMS FROM 2-7/8"X 5-1/2"VBR TO 7"PIPE RAMS SIMOPS:LAY DOWN DRILLING BAILS, REMOVE BX ELEVATORS Printed 2/23/2015 11.31:49AM • North America-ALASKA B Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project.Prudhoe Bay Site:PB L Pad Rig Name/No..PARKER 273 Spud Date/Time:6/8/2001 12'00:00AM Rig Release: Rig Contractor PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 22.30 2.00 BOPSUR P INTI PJSM TEST UPPER 7"PIPE RAMS -MAKE UP TEST JOINT -FMC REP BACK OUT LDS -PULL 9-1/8"WEAR RING -INSTALL TEST JOINT AND TEST PLUG FILL STACK -PRESSURE TEST 7"RAMS TO 250 PSI LOW, 3500 PSI HIGH FOR 5 MINUTES EACH:GOOD TESTS -BLEED OFF PRESSURE -PULL TEST JOINT&PLUG -BLOW DOWN STACK AND RIG DOWN TEST EQUIPMENT 22:30 - 00:00 1.50 CASING P INTI PJSM WITH DOYON CASING TO RIG UP FOR 7"CASING RUN -CLEAR RIG FLOOR -MAKE UP VOLANT TOOL TO TOP DRIVE RIG UP DOYON CASING TONGS -BEGIN MAKING UP BAIL EXTENSIONS 1/30/2015 00:00 - 02:30 2.50 CASING P INTI RIG UP TO RUN 7",26#,L-80,VTHC LONG STRING -INSTALL BAIL EXTENSIONS MAKE UP MANUAL 250 TON SIDE DOOR ELEVATORS -MAKE UP CASING PUP TO LH ACME LANDING JOINT AND LAY DOWN IN PIPE SHED 02:30 - 08:30 6.00 CASING P INTI RUN 7",26#,L-80,VTHC CASING FROM SURFACE TO 9-5/8"WINDOW -BAKER-LOCK ALL CONNECTIONS IN SHOE TRACK -CHECK FLOATS PER WELL PLAN -USE JETLUBE SEAL GUARD ON ALL OTHER CONNECTIONS -TORQUE TURN CONNECTIONS TO 11,950 FT-LBS RUN 1 FLOATING CENTRALIZER ON JOINTS 1-150 AND 207-264 -FILL LINER WITH VOLANT EVERY 10 JOINTS -WASH DOWN AT 3 BPM FOR 5 MINUTES WHILE TOPPING OFF,3 BPM,170 PSI -P/U=47 K,S/O=47 K -RIH AT 39 FT/MIN INSIDE CASING -MUD WEIGHT 11.0 PPG IN,11.0 PPG OUT -MUD LOSSES=0 BBLS WHILE RIH 08:30 - 09:00 0.50 CASING P INTI CIRCULATE BOTTOMS UP AT 9-5/8"WINDOW (2,711'MD) -PUMP 76 BBLS STAGE PUMPS UP TO 7 BPM IN 1 BBL INCREMENTS 7 BPM,550 PSI,12%FLOW. MW IN&OUT:11.0 PPG MONITOR WELL PRIOR TO RUNNING IN TO OPEN HOLE WELL IS STATIC NO LOSSES WHILE CIRCULATING Printed 2/23/2015 11:31.49AM SNorth America-ALASKA-BP • Page 30 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 20:30 11.50 CASING P INTI RUN 7",26#,L-80,VTHC CASING FROM 9-5/8" WINDOW CIRCULATE BOTTOMS UP AT TOP OF UGNU (3,075'MD) -PUMP 87 BBLS,STAGE UP TO 7 BPM 7 BPM,587 PSI,13%FLOW CIRCULATE BOTTOMS UP AT TOP OF SB_NA (5,045'MD) -PUMP 147 BBLS,STAGE UP TO 3 BPM 3 BPM,530 PSI,9%FLOW MONITOR WELL PRIOR TO CONTINUE RIH WELL IS STATIC NO LOSSES WHILE CIRCULATING CONTINUE RUNNING 7,26#,L-80,VTHC CASING 20:30 - 22:00 1.50 CASING P INTI CIRCULATE BOTTOMS UP AT TOP OF HRZ, 7,930'MD STAGE PUMPS UP TO 3 BPM IN 1 BBL INCREMENTS 3 BPM,530 PSI,9%FLOW. MW IN&OUT:11.0 PPG AT APPROXIMATELY 2100 HRS,DURING CIRCULATION: BAKER REP NOTICED 2 DENTS IN THE METAL FLASHING THAT COVERS THE COUNTERBORE AND VANISHING THREADS OF THE BTC BOX AT THE LOWER END OF THE PACKER ASSEMBLY 22:00 - 00:00 2.00 CASING N WAIT 7,930.00 INTI DISCUSS PLAN FORWARD -DISCUSS WITH BOT REP,BOT CHIEF ENGINEER,ODE AND ROTARY SUPERINTENDENT -DECISION FROM ETL&ODE TO RUN NEW ECP CONTINUE CIRCULATION ABOVE HRZAT 7,930'MD RECIPROCATE-40 FT WHILE CIRCULATING 3 BPM,350 PSI,9%FLOW SEEPAGE LOSSES OF-3 BPH 1/31/2015 00:00 - 08:00 8.00 CASING N WAIT 7,930.00 INTI CIRCULATE ABOVE HRZAT7,930'MD RECIPROCATE-40 FT WHILE CIRCULATING 3 BPM,350 PSI,9%FLOW SEEPAGE LOSSES OF-3 BPH WAIT ON NEW ECP PACKER AND PUPS TO BE RE-CUT Printed 2/23/2015 11:31:49AM • North America ALASKA BP 11111 Page 31 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual©95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:00 - 14:00 6.00 CASING P INTI ECP ON LOCATION -PJSM TO CONTINUE CASING RUNNING -CONTINUE RUNNING 7",26#,L-80,VTHC CASING -USE JETLUBE SEAL GUARD ON ALL OTHER CONNECTIONS -TORQUE TURN CONNECTIONS TO 11,950 FT-LBS -FILL CASING EVERY 10 JOINTS -S/0=132K -RIH AT 30 FT/MIN INSIDE CASING -MUD WEIGHT 11.0 PPG IN,11.0 PPG OUT 14:00 - 15:30 1.50 CASING P INTI PJSM MAKE UP LANDING JOINT AND HANGER ASSEMBLY -PICK UP HANGER JOINT AND LANDING JOINT BREAK CIRCULATITON AT 3 BPM -RUN IN HOLE TO 11,028" 1 STAGE PUMPS UP TO 5 BPM AT 5BPM-80%LOSSES WASH DOWN TO TAG LANDING RING STAGE PUMPS UP TO 5 BPM,NO RETURNS BRING PUMPS DOWN TO 3 BPM,NO RETURNS FLOW CHECK WELL:WELL IS STATIC PUMP 0.5 BPM WHILE WORKING PIPE STRETCH:NO RETURNS INCREASE TO 1 BPM WHILE WORKING PIPE STRETCH:NO RETURNS 15:30 - 00:00 8.50 CASING N DPRB 11,058.00 INTI SET HANGER ON LANDING RING DISCUSS WITH ODE AND SUPERINTENDENT WHILE WAITING ON ORDERS PUMP 2 BBLS EVERY 30 MINS TO KEEP LINES WARM NO RETURNS DECISION MADE TO MIX UP 80 PPB SUPERPILL ORDER 870 BBLS OF FRESH 11 PPG LSND MUD BEGIN BUILDING PILL&WAIT ON MUD 24 HR LOSSES=488 BBLS 2/1/2015 00:00 - 01:00 1.00 CASING N DPRB 11,058.00 INTI COMPLETE MIXING OF 80 PPB LCM PILL TAKE ON FRESH 11 PPG LSND MUD TO PITS PREPARE TO ATTEMPT TO GAIN CIRCULATION Printed 2/23/2015 11:31.49AM • North America-ALASKA-BP III Page 32 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:00 - 08:00 7.00 CASING N DPRB 11,058.00 INTI rtPJSM PUMP 40 BBL,80 PPB LCM PILL -STAGE PUMPS UP FOM 1 BPM TO 5 BPM OVER 30 MINS PRIOR TO PUMPING LCM PILL -CIRCULATING DOWN HOLE TAKING RETURNS TO ACTIVE PIT SYSTEM 1 BPM,375 PSI,0%FLOW,0%RETURNS 2 BPM,480 PSI, 0%FLOW 3 BPM,658 PSI,0%FLOW-SLIGHT MOVEMENT OF FLUID INTO FLOW BOX 4 BPM,800 PSI,2%FLOW,0%RETURNS 5 BPM,955 PSI,4%FLOW, PUMP 40 BBLS,80 PPB LCM, 35 BBLS DISPLACED,INCREASE RATE TO 5.5 BPM TO CATCH PILL 90 BBLS DISPLACED,5.5 BPM,848 PSI,5% FLOW,23%RETURNS 195 BBLS DISPLACED,5.5 BPM,767 PSI,8% FLOW,60%RETURNS 335 BBLS DISPLACED,5.5 BPM,730 PSI,11% FLOW,70%RETURNS 450 BBLS DIPSLACED(PILL OUT OF CASING) 5.5 BPM,770 PSI,11%FLOW,75%RETURNS 660 BBLS DISPLACED(PILL IN 9-5/8" 1WINDOW),5.5 BPM,801 PSI,11%FLOW,80% RETURNS 700 BBLS DISPLACED,LCM COMING ACROSS ISHAKERS,5.5 BPM,11%FLOW,90% RETURNS 830 BBLS DISPLACED(100 BBLS AFTER SURFACE TO SURFACE),5.5 BPM,830 PSI, i 11%FLOW,93%RETURNS DISCUSS WITH ODE,CONTINUE CIRCULATING AFTER 1035 BBLS PUMPED,LOST 22 BBLS IN LAST HOUR WHILE PUMPING 5.5 BPM,93% RETURNS I GIVEN APPROVAL TO PERFORM CEMENT JOB. LOSSES DURING CIRCULATION:290 BBLS Printed 2/23/2015 11:31:49AM • North America-ALASKA-BP • Page 33 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date.2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:00 - 12:00 4.00CEMT P INTI CEMENT 7"INTERMEDIATE CASING AS FOLLOWS: -PJSM&VERIFY PRESSURE CROSSCHECK CHECKLIST PRIOR TO JOB -FILL LINES WITH WATER AND PRESSURE TEST TO 250 PSI LOW AND 4500 PSI HIGH FOR 5 MINUTES EACH-PASS PUMP 50 BBLS OF 11.0 PPG MUDPUSH II SPACER @ 5.5 BPM ICP AT 5.5 BPM 725 PSI I-DROP BOTTOM PLUG i-PUMP 216.5 BBLS OF 11.5 PPG LITECRETE ©5.5 BPM,EXCESS VOLUME 40% (YIELD 1.74 CU.FT/SK) I-PUMP 26.1 BBLS OF 15.8 PPG CLASS G TAIL @ 5.5 BPM,EXCESS VOLUME 40% (YIELD 1.53 CU.FT/SK) -DROP TOP PLUG -NO PIPE RECIPROCATION -KICK OUT PLUG WITH 10 BBL OF FRESH WATER FROM CEMENTERS PERFORM DISPLACEMENT WITH RIG PUMPS [AND 11.0 PPG LSND MUD 330 BBLS 11.0 PPG MUD DISPLACED AT 5.5 BPM:ICP 686 PSI AT 3600 STROKES AWAY PRESSURE INCREASES TO 1,650 PSI COME DOWN ON PUMPS,PRESSURE DOES INOT BLEED OFF DISCUSS OPTIONS WITH ODE-DECISION MADE TO CONTINUE WIHT DISPLACMENT I-INCREASE PUMP PRESSURE WHILE WORKING PIPE STRETCH 6 TIMES j PRESURE INCREASES TO 1,950 PSI BEFORE 1 PACK OFF BREAKS LOOSE REGAIN FULL RETURNS AND CONTINUE WITH DISPLACEMENT AT 5 BPM -REDUCE RATE TO 2 BPM PRIOR TO PLUG BUMP:FINAL CIRCULATING(BUMP) I PRESSURE=720 PSI I-BUMP PLUG AND INCREASE PRESSURE TO 1200 PSI,CHECK FLOATS-GOOD DISPLACE 388 BBLS MUD AT 5.5 BPM:ICP 668 PSI,11%FLOW,FCP 1235 PSI,11%FLOW DISPLACE 17.3 BBLS AT 2 BPM,ICP&FCP 800 PSI 11%FLOW -TOTAL MUD DISPLACEMENT VOLUME 405.3 BBLS, 10 BBLS LOST DURING CEMENT JOB -CEMENT IN PLACE AT 13:10 Printed 2/23/2015 11.31:49AM North America-ALASKA-BP Page 34 of 55 Operation Summary Report Common Well Name L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 I Spud Date/Time:6/8/2001 12:00:00AM Rig Release. Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 15:00 3.00 CEMT P INTI LINE UP FOR SCHLUMBERGER CEMENTERS TO INFLATE ECP PACKER PJSM&VERIFY PRESSURE CROSSCHECK !-INCREASE PRESSURE TO FROM 1000 TO 2000 IN 200 PSI INCREMENTS.PSI AS PER BAKER REPRESENTATIVE. -BLEED OFF PRESSURE LINE UP TO OPEN ES CEMENTER -PRESSURE UP TO 3,200 PSI AT 2 BPM AND SHEAR OPEN ES CEMENTER -PRESSURE BLED OFF INDICATING r — CEMENTER OPEN 115:00 - 16:00 1.00 CEMT P INTI CIRCULATE SURFACE TO SURFACE -PUMP AT 7 BPM,900 PSI,FULL RETURNS 16:00 - 18:30 2.50 CEMT P INTI CEMENT SECOND STAGE 7"INTERMEDIATE CASING AS FOLLOWS: -VERIFY PRESSURE CROSSCHECK CHECKLIST PRIOR TO JOB I-PUMP 30 BBLS OF 11.0 PPG MUDPUSH II SPACER @ 5 BPM,419 PSI,FULL RETURNS -PUMP 114.1 BBLS OF 15.8 PPG CLASS G @ 5.4 BPM 577 PSI FULL RETURNS EXCESS VOLUME 40 BBLS (YIELD 1.17 CU.FT/SK) -DISENGAGE VOLANT TOOL AND DROP PLUG -NO PIPE RECIPROCATION -KICK OUT PLUG WITH 10 BBL OF FRESH WATER FROM CEMENTERS PERFORM DISPLACEMENT WITH RIG PUMPS AND 11 PPG LSND MUD PER SLB CADE -83 BBLS DISPLACED AT 7 BPM:ICP 900 PSI, FCP 1475 PSI FULL RETURNS -REDUCE RATE TO 2 BPM PRIOR TO PLUG BUMP:FINAL CIRCULATING(BUMP) PRESSURE=790 PSI BUMP PLUG AND INCREASE PRESSURE TO 12300 PSI FOR 5 MIN TO CLOSE HES CEMENTER -BLEED OFF PRESSURE AND CHECK HES CEMENTER CLOSED,CHECK FLOATS- GOOD -CIP@17:30 -TOTAL MUD DISPLACEMENT VOLUME 87.5 BBLS,946 STKS(MEASURED BY STROKES @ 96%PUMP EFFICIENCY) -40 BBLS EXCESS VOLUME CEMENT PUMPED,40 BBLS CEMENT RETURNED _ 18:30 - 21:00 2.50 i CEMT P INTI R/D CEMENT EQUIPMENT -BLOW DOWN&RIG DOWN CEMENT LINE -FILL STACK WITH CEMENT CONTAMINANT PILL -FLUSH ALL LINES -FUNCTION COMPONENTS RIG DOWN VOLANT TOOL CLEAN AND CLEAR RIG FLOOR Printed 2/23/2015 11:31:49AM • North America-ALASKA-BP . Page 35 of 55 } Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12.00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01 A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code I NPT NPT Depth Phase I Description of Operations (hr) (usft) _ 21:00 - 00:00 0 CEMT P INTI PJSM WITH FMC TO SET AND TEST 7" CASING PACKOFF -MAKE UP PACK OFF SETTING TOOL -RUN PACKOFF AND SET PER FMC FMC REP RUN IN AND TORQUE LOCK DOWN SCREWS FMC TEST PACKOFF 250 PSI LOW AND 5000 PSI FOR 30 MINS GOOD TEST SIM OPS DURING PT:LAY DOWN BAIL I EXTENSIONS AND 250 TON MANUAL SIDE DOOR ELEVATORS 24 LOSSES=318 BBLS 2/2/2015 00:00 - 01:30 1.50 CEMT P INTI PJSM TO FLUSH STACK -MAKE UP STACK FLUSHING TOOL FLUSH STACK WITH CEMENT CONTAMINATE PILL 01:30 - 02:30 1.00 BOPSUR P INTI PJSM CHANGE 7"RAMS TO 2-7/8"X 5-1/2" VBRS -DRAIN STACK -CLOSE BLIND SHEARS -DE-ENERGIZE ACCUMULATOR CHANGE OUT RAMS 02.30 - 04:30 2.00 BOPSUR P INTI PJSM TEST UPPER 2-7/8"X 5-1/2" RAMS I-MAKE UP TEST JOINT -BACK OUT LDS -INSTALL TEST JOINT AND TEST PLUG -FILL STACK -PRESSURE TEST RAMS TO 250 PSI LOW, 3500 PSI HIGH FOR 5 MINUTES EACH:GOOD TESTS TEST WITH 4"AND 4-1/2"TEST JOINTS -BLEED OFF PRESSURE -PULL TEST JOINT&PLUG -BLOW DOWN STACK AND RIG DOWN TEST EQUIPMENT 04:30 - 07:00 , 2.50 CEMT P ' INTI PJSM INSTALL DRILLING BAILS -REMOVE MANUAL ELEVATORS AND LONG BAILS FROM RIG FLOOR -INSTALL DRILLING BAILS AND BX ELEVATORS WITH 4"INSERTS CALIPERED&VERIFIED BY DRILLER AND ASST DRILLER INSTALL BOWL INSERTS IN PS-21 PERFORM SAVER SUB INSPECTION -PULL CLAMP CYLINDER HINGE PIN -CLEAN PIN CONNECTION PROFILE GAUGE:NO SHARP EDGES I-ALUMINUM BOX GAUGE:9 TURNS TO MAKE UP,2-5/8"FACE TO FACE MEASUREMENT 07:00 - 08:30 1.50 CEMT N CEMT 11,054.00 INTI PJSM MU 6.125"CLEAN OUT BHA -MAKE UP BHA PER SLB -M/U TO USED SMITH 6-1/8"PDC BIT -PICK UP AND MAKE UP REMAINING 6 1/8" BHA PER SLB DD Printed 2/23/2015 11 31.49AM • North America-ALASKA-BP 1110 Page 36 of 55 Operation Summary Report • Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual©95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) 1 (usft) 08:30 - 10:00 1.50 -t CEMT N CEMT 11,054.00 INTI RUN IN HOLE VNTH 6-1/8"CLEAN OUT BHA RIH W/6-1/8"PDC BIT,BIT SUB,3 X FLEX COLLARS,X/O SUB,3 X 4"HWDP,HYDRAULIC JARS,5 X 4"HWDP, X/O, BHA OAL: 374.63' -RIH ON ELEVATORS WITH 4"DP STANDS !FROM DERRICK -TAG OBSTRUCTION AT 2,447'MD WITH 10 K 10:00 - 16:30 6.50 CEMT N CEMT 11,054.00 INTI "WAIT ON SECOND STAGE CEMENT TO REACH 500 PSI PULL PS-21S,CLEAN,INSPECT AND PERFORM PREVENTATIVE MAINT. -OPEN CENTRIFUGE TO CLEAN AND INSPECT -LUBRICATE RIG -PERFORM DERRICK INSPECTION -SERVICE TOP DRIVE,ST-80,AND IDM 16:30 - 20 30 4.00 CEMT N CEMT 11,054.00 INTI CEMENT AT 500 PSI COMPRESSIVE STRENGTH,PREPARE TO DRILL OUT ES CEMENTER -ESTABLISH CIRCULATION ABOVE LAST TAG AT 2,447'MD PUMP 250 GPM,600 PSI,100 RPM WITH 3K TORQUE ON&1 K OFF DRILL CEMENT FROM 2,447'TO 2,559'MD TAG PLUG AT 2,559'MD,19 FT HIGHER THAN CASING PIPE TALLY DRILL PLUG AND ES CEMENTER FROM 2,559' MD TO 2,563'MD -PUMP 250 GPM,600 PSI,100 RPM WITH 3K TORQUE ON&1 K OFF P/U:78 K,S/O:72 K 20:30 - 00:00 3.50 CEMT N CEMT 11,054.00 INTI RIH WITH 6-1/8"DRILLING BHA FROM 2,563' MD TO 6,538'MD -RIH ON ELEVATORS FROM DERRICK -FILL DRILL PIPE EVERY 20 STANDS ENCOUNTER STRINGER AT 3,545'MD -REAM DOWN FROM 3,545'MD TO 3,625' PUMP 250 GPM,620 PSI,80 RPM,3K TORQUE ON,1KOFF P/U:130K,S/O 90 KAT 6,538'MD MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 2/3/2015 00:00 - 03:00 3.00 CEMT N CEMT 11,058.00 INTI RIH WITH 6-1/8"DRILLING BHA FROM 6,538' MD TO 10,800'MD -RIH ON ELEVATORS FROM DERRICK -FILL DRILL PIPE EVERY 20 STANDS -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT Printed 2/23/2015 11.31:49AM 1111 North America-ALASKA-BP • Page 37 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type.RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 03:00 - 04:30 1.50 CEMT N CEMT 11,058.00 INTI MIT 7"L-80 26#CASING FROM BAFFLE ADAPTER TO SURFACE -CONFIRM VALVE ALIGNMENT PRIOR TO TEST -PRESSURE TEST 250 PSI LOW FOR 5 MIN -PUMPED 61 STKS(5.7 BBLS)TO 3680 PSI • FOR 30 CHARTED MINUTES. 10 PSI LOST IN 1ST 15 MINS 1-0 PSI LOST IN 2ND 15 MINS MIT MEETS BP STP CRT-AK-10-45 CRITERIA -BLEED OFF PRESSURE,BLED BACK 5.3 BBLS -WELL IS STATIC -RECEIVED PERMISSION TO PROCEED FROM WTL 04:30 - 07:00 2.50 CEMT N CEMT 11,058.00 INTI DRILL OUT SHOE TRACK -RIH WITH 6-1/8"DRILLING BHA FROM 10,800' MD TO 10,885'MD -TAG CEMENT AT 10,885'MD ESTABLISH CIRCULATION AT 245 GPM& 1600 PSI -DRILL SHOE TRACK FROM 10,885'MD TO 11,023'MD 80 RPM,13K TORQUE -245 GPM&1600 PSI I-TOP OF BAFFEL ADAPTER AT 10,944'MD TOP OF FLOAT COLLAR AT 10,988'MD -P/U 240 K,S/O 125K AT 10,885'MD 07:00 - 08.30 1.50 CEMT N CEMT 11,058.00 INTI DISPLACE TO 8.9 PPG FLO-PRO MUD -PUMP 30 BBL OF 11.0 PPG HI-VIS SPACER -PUMP 30 BBLS WATER -DISPLACE WELL TO 8.9 PPG FLO-PRO -VOLUME TRACK BBL IN=BBL OUT -OBTAIN SPR WITH NEW MUD 08:30 - 09:30 1.00 CEMT N CEMT 11,058.00 INTI CUT AND SLIP DRILL LINE CUT AND SLIP 9 WRAPS,79'OF DRILL LINE -CALIBRATE AMPHION AND SLB -CHECK CROWN SAVER 09:30 - 15:00 5.50 CEMT N CEMT 11,058.00 INTI POOH WITH 6-1/8"DRILLING BHA I-POOH ON ELEVATORS FROM 11,023'MD TO 374'MD -P/U=241K,S/0=125K AT 11,023'MD -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT I-MUD WEIGHT 8.9 PPG IN,8.9 PPG OUT 15:00 - 16:30 1.50 CEMT N CEMT 11,058.00 INTI UD SLB 6-1/8"DRILLING BHA -MONITOR WELL FOR 10 MINUTES PRIOR TO PULLING BHA INTO STACK WELL STATIC -LAY DOWN BHA#8 PER SLB DD/MWD -RACK BACK HWDP AND JARS -CLEAN AND CLEAR RIG FLOOR BIT GRADE:0-0-NO-A-X-I-NO-LOG 16:30 - 17:00 0.50 CEMT N CEMT 11,058.00 INTI FUNCTION TEST BOPS -FUNCTION TEST BOPS PER AOGCC 7 DAY REQUIREMENT 17:00 - 19:00 2.00 CEMT N CEMT 11,058.00 INTI RIG UP SCHLUMBERGER ELINE PJSM COVERED RIG UP AND SIMOPS DURING OPERATION -RIG UP ELINE SHEAVES -R/U USIT/MSIP/CCL/GR Printed 2/23/2015 11:31:49AM • North America-ALASKA-BP S , Page 38 of 55 • 4 s /' Operation Summary Report'. Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual©95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 19:00 - 00:00 5.00 EVAL N CEMT 11,058.00 INTI LOG 7"INTERMEDIATE CEMENT -RUN IN HOLE WITH USIT/MSIP/CCUGR -CALIBRATE USIT LOG AT 3200'ELMD -RIH AND LOG FROM 11,010'ELMD TO 10,400' ELMD TO ENSURE DATA QUALITY AS PER PETROPHYSICIST -RIH TO 11,010'ELMD AND START MAIN PASS LOG FROM 11,010'ELMD TO 9,800'ELMD AT 30-40 FT/MIN 2/4/2015 00:00 - 09:00 9.00 EVAL N CEMT 10,058.00 INTI USIT LOG 7"INTERMEDIATE CASING CEMENT -CONTINUE MAIN PASS LOG FROM 9800' ELMD TO SURFACE -REPEAT PASS FROM 2700 TO 2200'DUE TO LOG DATA QUALITY -CONSULT WITH TOWN PETROPHYSICIST& IODE -FINAL TOC AND LOG INTERPRETATION STILL PENDING BUT CONFIRMATION 10-60 ZONAL ISOLATION ACHIEVED AND PERMISSION TO PROCEED. *TOC INTERPRETATION BY GERARDO CEDILLO 09:00 - 10.30 1.50 EVAL N CEMT 10,058.00 INTI RIG DOWN E-LINE j-BREAK DOWN E-LINE USIT ASSEMBLY -LAY DOWN IN PIPE SHED AND LOAD ON SLB TRUCK -RIG DOWN E-LINE TRUCKS 10:30 - 13:00 2.50 CASING P INTI PICK UP 6.125"DRILLING BHA#9 -MAKE UP DRILLING BHA PER SLB -TEST ARCHER TOOL IN TABLE -LOAD SOURCE PER MWD -RIH WITH BHA -6.125"PDC BIT,4-3/4"ARCHER RSS,PD FLEX COLLAR,PD E-MAG RECEIVER, IMPULSE MWD,4-3/4"IN LINE STABILIZER, ADNVISION 475,(3)FLEX COLLAR, CROSSOVER SUB, -OAL OF BHA =179.73' 13 00 - 15:00 2.00 CASING P INTI RIH WITH 6.125"DRILLING BHA#9 FROM 179' MD TO 3000'MD -RIH ON ELEVATORS WITH 4"DP FROM DERRICK -BREAK CIRCULATION EVERY 15 STANDS, 250 GPM,1200 PSI -RIH AND SHALLOW HOLE TEST MWD TOOL AT 1500'MD,ADN SHOWING BAD DATA -RIH TO 3000'MD AND REPEAT ARCHER HOLE TEST,ADN SHOWING BAD DATA 15:00 - 19:30 4.50 CASING N DFAL 3,000.00 INTI POOH WITH SLB BHA#9 DUE TO FAILED ADN -TROUBLESHOOT ADN AT 3000'WITH NO SUCCESS I-DISCUSS TOOL FAILURE WITH ODE AND DECISION TO POOH AND CHANGE OUT ADN -PULL OUT OF HOLE WITH ARCHER RSS FROM 3000'MD TO 179'MD -POH ON ELEVATORS -STAND 4"DP IN DERRICK -P/U 78K,S/0 78K AT 3000' MD -MUD WEIGHT IN&OUT=8.9 PPG Printed 2/23/2015 11:31:49AM North America-ALASKA-BP Pale 39 of 55 Operation Summary Report rs • Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual fp95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:30 - 21:00 1.50 CASING N DFAL 3,000.00 INTI LAY DOWN SLB 6.125"BHA#9 -MONITOR WELL 10 MIN PRIOR TO PULLING BHA THRU STACK WELL IS STATIC -LAY DOWN 6.125"DRILLING BHA#9 PER SLB DD !-REMOVE SOURCE PER SLB MWD BIT GRADE:0-0-NO-A-X-I-NO-DTF 21:00 - 00:00 3.00 CASING N DFAL 3,000.00 INTI WAIT ON BACKUP SLB ADN -RIG SERVICE AND CLEAN AND CLEAR RIG FLOOR WHILE WAITING ON BACKUP ADN DERRICK INSPECTION -CHANGE OUT LIGHTS IN DERRICK -PRESSURE WASH TOP DRIVE AND DERRICK -MONITOR WELL ON CONTINUOUS HOLE FILL -LOAD ADN IN TOOL SHED AT 22:30 -WARM UP TOOL AND SLB PROGRAM AND 1 TEST TOOL IN PIPE SHED SLB TOWN CHECK AND CONFIRM TOOL PROGRAMING 2/5/2015 00:00 - 01:30 1.50 CASING N DFAL 3,000.00 INTI PICK UP 6.125"DRILLING BHA#10 -MAKE UP DRILLING BHA#10 PER SLB LOAD SOURCE PER MWD -RIH WITH BHA -6.125"PDC BIT,4-3/4"ARCHER RSS,PD FLEX COLLAR,PD E-MAG RECEIVER, IMPULSE MWD,4-3/4"IN LINE STABILIZER, ADNVISION 475,(3)FLEX COLLAR, CROSSOVER SUB, -OAL OF BHA =179.44' 01.30 - 03.30 2.00 CASING N DFAL 3,000.00 INTI RIH WITH 6.125"DRILLING BHA#10 FROM 179' MD TO 3000'MD -RIH ON ELEVATORS WITH 4"DP FROM DERRICK -BREAK CIRCULATION EVERY 15 STANDS, 222 GPM,962 PSI RIH AND SHALLOW HOLE TEST MWD TOOL I AT 1500'MD-PASS -CONTINUE RIH WITH BHA FROM 1500'MD TO 3000'MD -MONITOR TRIP VIA TRIP TANK PROPER DISPLACEMENT 03:30 - 09:30 6.00 CASING P INTI RIH WITH 6.125"DRILLING BHA#10 FROM 3000'MD TO 11023'MD -RIH ON ELEVATORS WITH 4"DP FROM 'DERRICK -ARCHER CIRCULATION EVERY 15 STANDS FOR 8 MIN,222 GPM,962 PSI -CONTINUE RIH WITH SLB BHA FROM 3000' MD TO 11,023'MD -TAG CEMENT AT 11,023'MD -OBTAIN SLOW PUMP RATES -MONITOR TRIP VIA TRIP TANK:PROPER —It (DISPLACEMENT Printed 2/23/2015 11:31.49AM •North America ALASKA BP Page 40 of 55 Operation Summary Report „ Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 1X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual t95.79usft(above Mean Sea Level) Date From-To Firs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:30 - 13:30 4.00 DRILL P PROD1 'DRILL OUT CEMENT AND SHOE TRACK PLUS 20'NEW HOLE FROM 11,023'MD TO 11,078' MD -DRILL FROM 11,023'MD TO 11,053'MD -257 GPM 1890 PSI ON,1830 PSI OFF -50 RPM 8K TORQUE ON,7K OFF -TORQUE INCREASE FROM 8K TO 12K AND PRESSURE INCREASE FROM 1900 PSI TO 2400 PSI AT 11,053'MD THEN DROPPED BACK I TO NORMAL -PULL INTO 7"SHOE AT 11,033'MD AND CIRCULATE BOTTOMS UP KINGAK SAMPLES IN BOTTOMS UP -DRILL AHEAD FROM 11,053'MD TO 11,078' MD -257 GPM 1890 PSI ON,1830 PSI OFF -50 RPM 8K TORQUE ON,7K OFF -P/U 205K,S/0 1138K,ROT 162K -MUD WEIGHT 8.9 PPG IN/9.0 PPG OUT 13:30 15:00 1.50 DRILL P PROD1 CIRCULATE BOTTOMS UP -PULL BACK TO 7"SHOE PUMP AT 250 GPM,1860 PSI -ROTATE 50 RPM,7K TORQUE MUD WEIGHT 9.0 PPG IN/9.0 PPG OUT 15.00 - 17:00 2.00 EVAL P PROQ1 RIG UP AND PERFORM FIT -MUD WEIGHT:9.0 PPG,8725'TVD,11,033' MD -PRESSURE UP TO 700 PSI, PRESSURE STABILIZED AT 650 PSI -FIT EMW:10.55 PPG -RECEIVE ODE APPROVAL TO CONTINUE -SEE ATTACHED CHART BLEED DOWN TEST EQUIPMENT 17:00 - 19:30 2.50 DRILL P PROD1 DRILL 6.125"PRODUCTION HOLE FROM 11,078'MD TO 11,120'MD(8780 TVD) -260 GPM 1980 PSI ON,1950 PSI OFF -110 RPM 9K TORQUE ON,7K OFF -SURVEY EVERY 30 FT MUD WEIGHT 9.0 PPG IN,9.0 PPG OUT -P/U 205K,S/O 140K,ROT 167K -ARCHER DROPPING AND NOT BUILDING ANGLE -PUMP OUT OF HOLE TO 7"SHOE FROM 11,120'TO 11,033'MD I -257 GPM,1900 PSI I-NO INDICATIONS OF PACK OFF,10K OVERPULLAT 11,086'MD -CALL ODE TO DISCUSS 19:30 - 20:30 1.00 DRILL P PROD1 CIRCULATE BOTTOMS UP PUMP AT 260 GPM,1920 PSI RECIPROCATE PIPE 40' -MUD WEIGHT 9.0 PPG IN/9.0 PPG OUT -DECISION TO POOH AND CHANGE OUT ARCHER BHA FOR MOTOR BHA Printed 2/23/2015 11'31.49AM • North America-ALASKA-BP • Page 41 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. 1 UWI:500292301100 Active datum:L-01A actual©95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 00:00 3.50 DRILL N DFAL 11,120.00 PROD1 ,PULL OUT OF HOLE WITH ARCHER RSS FROM 11,033'MD TO 6,148'MD DUE TO INSUFFICIENT BUILD RATE -MONITOR WELL FOR 10 MIN:STATIC -PON ON ELEVATORS -STAND 4"DP IN DERRICK -P/U 160K,S/O 128K AT 8,645'MD MONITOR TRIP VIA TRIP TANK:PROPER DISPLACEMENT MUD WEIGHT IN&OUT=9.0 PPG 2/6/2015 00:00 - 00:30 0.50 DRILL N DFAL � 11,120.00 PROD1 ,PULL OUT OF HOLE WITH ARCHER RSS FROM 6,148'MD TO 5,756'MD -POH ON ELEVATORS -STAND 4"DP IN DERRICK -P/U 128K,S/O 90KAT 6,148'MD -MONITOR TRIP VIA TRIP TANK PROPER DISPLACEMENT -MUD WEIGHT IN'&OUT=9.0 PPG 00:30 - 01:00 0.50 DRILL P PROD1 RIG SERVICE -LUBRICATE TOP DRIVE 01:00 - 04:30 3.50 DRILL N RREP 0.00 PROD1 TROUBLESHOOT IDM -IDM NOT FUNCTIONING -CHECK IDM HYDRAULICS CHECK IDM SOFTWARE AND ELECTRONICS -DISCOVER LOOSE WIRE AND DECODER ISSUES _ 04:30 - 07:30 3.00 DRILL N DFAL 11,120.00 PROD1 ,PULL OUT OF HOLE WITH ARCHER RSS FROM 5,756'MD TO 458'MD POH ON ELEVATORS -STAND 4"DP IN DERRICK -MONITOR TRIP VIA TRIP TANK PROPER DISPLACEMENT -MUD WEIGHT IN&OUT=9.0 PPG 07:30 - 09:30 2.00 DRILL N DFAL 11,120.00 PROD1 LAY DOWN BHA#10 MONITOR WELL 10 MIN PRIOR TO PULLING BHATHRU STACK: WELL IS STATIC I-LAY DOWN 6.125"DRILLING BHA#10 PER SLB DD -REMOVE SOURCE PER SLB MWD BIT GRADE:0-0-NO-A-X-I-NO-DTF 09:30 - 11:00 1.50 DRILL N RREP 0.00 PROD1 REPAIR IDM -REPLACE LOOSE WIRE 11:00 - 13:00 2.00 DRILL N DFAL 11,120.00 PROD1 PICK UP 6.125"MOTOR DRILLING BHA#11 -MAKE UP DRILLING BHA#11 PER SLB -RIH WITH BHA -6.125"HUGHES INSERT VM-R18 BIT,PDM 475 MOTOR WITH 1.73 BEND,4-3/4"IN LINE STABILIZER,PONY COLLAR,X/O,IMPULSE MWD,4-3/4"IN LINE STABILIZER, X/O,(3)FLEX COLLAR,CROSSOVER SUB, -OAL OF BHA =170.88' Printed 2/23/2015 11:31:49AM North America-ALASKA-BP . Page 42 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date!Time:6/8/2001 12:00:00AM 1Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual©95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 19:30 6.50 DRILL N DFAL 11,120.00 PROD1 RIH WITH 6.125"MOTOR DRILLING BHA#11 FROM 171'MD TO 11,033'MD -RIH ON ELEVATORS WITH 4"DP FROM DERRICK -FILL PIPE EVERY 20 STANDS -SHALLOW HOLE TEST MWD TOOL AT 1500' MD-PASS CONTINUE RIH WITH SLB BHA FROM 1500' MD TO 11,033'MD OBTAIN SLOW PUMP RATES -MONITOR TRIP VIA TRIP TANK PROPER DISPLACEMENT 19:30 - 21:30 2.00 DRILL N DFAL 11,120.00 PROD1 WASH BHA FROM 11,033'MD TO 11,120'MD -RIH WITH NO PUMPS AND SOFT TAG AT 11,065'MD WITH 5K DOWN -STAGE UP PUMPS AND WASH FROM 11,065' MD TO 11,120'MD 1-250 GPM 1640 PSI -10 RPM,8K TORQUE - 200-250 PSI PRESSURE SPIKES WHILE REAMING DOWN -WORK STAND TWICE AND CLEAN PRESSURES -NO KINGAK CAVINGS IN BOTTOMS UP MUD WEIGHT 9.0 PPG IN/9.0 PPG OUT 21:30 - 00:00 2.50 DRILL P PROD1 i DRILL 6.125"PRODUCTION HOLE FROM 11,120'MD TO 11,150'MD(8815'TVD) -250 GPM, 1790 PSI ON,1700 PSI OFF -ORIENT MOTOR 30 DEGREES LEFT AND 100%SLIDE -AVERAGE WOB 8-16K -AVERAGE ROP 10-15 FT/HR IN SHUBLIK -PU 205K,SO 140K, -SURVEY EVERY-30 FT -ACTUAL ROTATE TIME=0 HRS -ACTUAL SLIDE TIME=1.68 HRS -MUD WEIGHT:9.0 PPG IN,9.0 PPG OUT -NO KINGAK CAVINGS IN RETURNS 2/7/2015 00:00 - 02:00 2.00 DRILL P PROD1 DRILL 6.125"PRODUCTION HOLE FROM 11,150'MD TO 11,170'MD -250 GPM, 1750 PSI ON,1700 PSI OFF -ORIENT MOTOR 30 DEGREES LEFT AND 100%SLIDE -AVERAGE WOB 8-16K -AVERAGE ROP 10-15 FT/HR IN SHUBLIK -PU 205K,SO 140K, -SURVEY EVERY-30 FT -MUD WEIGHT:9.0 PPG IN,9.0 PPG OUT -NO KINGAK CAVINGS IN RETURNS -ACTUAL SLIDE TIME=1.00 FIRS 02:00 - 03:30 1.50 DRILL P PROD1 TRIP BACK INTO SHOE TO TEST KINGAK -CIRCULATE FOR 10 MIN -POOH FROM 11,170'MD TO 11,000'MD -NO TIGHT SPOTS WHILE POOH -TIH FROM 11'000'MD TO 11,170'MD - AT 11,045'MD TOOK 30K TO WIPE THROUGH -TAG UP AT 11,167'WITH 3'OF FILL -STAGE UP PUMPS TO 250 GPM, 1680 PSI 1-POINT MOTOR HIGHSIDE AND CLEAN FILL Printed 2/23/2015 11:31:49AM • North America-ALASKA BP• Page 43 of 55 Operation Summary Report Common Well Name L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual©95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:30 - 10:00 6.50 DRILL P PROD1 DRILL 6.125"PRODUCTION HOLE FROM 11,170'MD TO 11,254'MD(8906 TVD) -250 GPM, 1745 PSI ON,1635 PSI OFF 1-AVERAGE WOB 08-16K -AVERAGE ROP 10-15 FT/HR IN SHUBLIK -PU 205K,SO 140K, SURVEY EVERY-30 FT j-MUD WEIGHT:9.0 PPG IN,9.0 PPG OUT -NO KINGAK CAVINGS IN RETURNS -WIPE 90'PRIOR TO CONNECTIONS -ACTUAL SLIDE TIME=5.16 HRS 10:00 - 10:30 0.50 DRILL P PROD1 TRIP BACK INTO SHOE FOR SAFETY STANDOWN MONITOR WELL FOR 10 MIN:STATIC TIGHT SPOT AT 11,252 WITH 30K OVERPULL -PUMP OUT OF HOLE FROM 11,252'MD TO 11,060'MD WITH NO OVERPULL PULL 11,060'MD TO 11,000'MD WITH NO OVERPULL 10.30 - 14:00 3.50 DRILL P PROD1 SAFETY STAND DOWN MONITOR WELL ON CONTINUOUS HOLE FILL:STATIC -PARKER DISCUSS 2015 INCIDENTS AND SLIDE PRESENTATION -DISCUSS SAFETY TOPIC OF INJURY PREVENTION THROUGH HAZARD RECOGNITION HAVE EACH CREW PERFORM HAZARD HUNT AND PRESENT THEIR FINDING 14:00 - 14:30 0.50 DRILL P PROD1 TIH FROM 11,000'MD TO 11,254'MD -TIH FROM 11'000'MD TO 11,170'MD -NO BRIDGES ENCOUNTERED -TAG UP AT 11,251'WITH 3'OF FILL -MONITOR TRIP VIA TRIP TANK PROPER DISPLACEMENT 14:30 - 00:00 9.50 DRILL P PROD1 DRILL 6.125"PRODUCTION HOLE FROM 11,254'MD TO 11,484'MD(9,005'TVD) 250 GPM, 1745 PSI ON,1635 PSI OFF -AVERAGE WOB 8-16K it PU 213K,SO 140K, -SURVEY EVERY-30 FT MUD WEIGHT:9.0 PPG IN,9.0 PPG OUT NO KINGAK CAVINGS IN RETURNS -ACTUAL ROTATE TIME=1.66 HRS 1-ACTUAL SLIDE TIME=4.82 HRS -WIPE 30-60'PRIOR TO CONNECTIONS 24 AOGCC NOTIFICATION FOR UPCOMING BOP TEST GIVEN AT 22:30 02/07/2015 Printed 2/23/2015 11:31.49AM • North America-ALASKA-BP • Page 44 of 55 fF Operation Summary Report : ., ' , Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM !Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT I NPT Depth Phase Description of Operations (hr) (usft) 2/8/2015 00:00 - 09:30 9.50 DRILL P PROD1 DRILL 6.125"PRODUCTION HOLE FROM 11,484'MD TO 11,806'MD -250 GPM, 1750 PSI ON,1660 PSI OFF -AVERAGE WOB 8-16K I-PU 215K,SO 138K,ROT 163K SURVEY EVERY-30 FT -MUD WEIGHT:8.9 PPG IN,8.9 PPG OUT NO KINGAK CAVINGS IN RETURNS -WIPE 30-60'PRIOR TO CONNECTIONS -ACTUAL ROTATE TIME=2.86 HRS -ACTUAL SLIDE TIME=2.06 HRS -WIPE 30-60'PRIOR TO CONNECTIONS -AT 11,806'MD TORQUE INCREASE FROM 9K TO 15K,PULL OFF BOTTOM AND TORQUE RETURN TO 9K 1-PLACE BIT ON BOTTOM AND TORQUE 'INCREASE TO 9-15K ERADIC TORQUE -CALL ODE TO DISCUSS 09:30 - 12:00 2.50 DRILL P PROD1 ICBU PRIOR TO TRIP CIRCULATE BOTTOMS-UP 3 TIMES 1-250 GPM,1800 PSI -RECIPROCATE PIPE 90'MD -DECISION TO POOH TO INSPECT BIT AND -TEST BOPS -ENOUGH BUILD SECTION COMPLETE TO CHANGE BHA TO ARCHER RSS 12:00 - 19:00 7.00 DRILL P PROD1 PULL OUT OF HOLE WITH SLB MOTOR BHA#11 FROM 11,806'MD TO 300'MD TO CHANGE BHA MONITOR WELL FOR 10 MIN:STATIC POOH ON ELEVATORS -STAND 4"DP IN DERRICK -P/U 200K,S/O 140K AT 11,033'MD -MONITOR WELL FOR 10 MIN AT 7"SHOE STATIC -MONITOR TRIP VIA TRIP TANK:PROPER DISPLACEMENT MUD WEIGHT IN&OUT=8.9 PPG -NO TIGHT SPOTS ENCOUNTERED 19:00 - 21 00 2.00 DRILL P PROD1 LAY DOWN SLB MOTOR BHA#11 -MONITOR WELL 10 MIN PRIOR TO PULLING 1 BHA THRU STACK:WELL IS STATIC -LAY DOWN 6.125"DRILLING BHA#11 PER SLB DD i-RACK BACK FLEX COLLARS BIT GRADE:1-1-CT-M-E-I-WT-TQ 21:00 - 21:30 0.50 BOPSUR P PROD1 RIG SERVICE -DERRICK INSPECTION -LUBRICATE RIG 21:30 - 22:00 0.50 BOPSUR P PROD1 PULL WEAR RING AND INSPECT SAVER SUB -PJSM WITH FMC REP 1-PULL WEAR RING -PULL CLAMP CYLINDER HINGE PIN -CLEAN PIN CONNECTION M/U SAVER SUB ALUMINUM BOX TEST GUIDE WITH 8 3/4"TURNS -MEASURE LOAD SHOULDER GAP:2 9/16" -MINIMAL GALLING AND EVEN WEAR Printed 2/23/2015 11.31:49AM • North America-ALASKA-BP • Page 45 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:OOAM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) • Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:00 - 00:00 2.00 BOPSUR P PROD1 RIG UP TO TEST BOPS -MAKE UP TUBING HANGER STYLE TEST PLUG INTO STRING -LAND TEST PLUG AND FMC RUN IN LOCKDOWN SCREWS -MAKE UP VALVE ASSEMBLY AND PUMP IN SUB INTO TOP DRIVE I-BLED AIR FROM TEST EQUIPMENT 2/9/2015 00:00 - 08:30 8.50 BOPSUR P PROD1 'PJSM,TEST 13-5/8",4 PREVENTER BOP AND RELATED EQUIPMENT -TEST BOP ACCORDING TO AOGCC •REGULATIONS AND PARKER PROCEDURES -TEST ANNULAR WITH 4"TEST JOINT TO 250 PSI LOW,3500 PSI HIGH,5 MINS CHARTED TEST VBRS WITH 4"AND 4-1/2"TEST JOINTS. -SEE ATTACHED DOCUMENTATION -MONITORED HOLE FILL WITH SECONDARY KILL LINE CONNECTED TO I/A. MAINTAINED •COLUMN OF FLUID ON KILL LINE BY RUNNING CHARGE PUMP AND KEEPING BLEEDER VALVE ON MUD PUMP OPEN TO ACTIVE PITS. 0-1 BBL/HR LOSSES DURING TEST JOHN CRISP OF AOGCC WAIVED WITNESS OF BOP TEST I-AFTER CHANGE OUT FROM 4"TO 4 1/2" 1 TEST JOINT,TROUBLE GETTING FIRST 4 1/2" PRESSURE TEST TROUBLE SHOOT SURFACE EQUIPMENT • -CHECK IA FOR FLUID BYPASSING TEST PLUG WHEN TESTING-NO FLUID I*HCR KILL FAILED PRESSURE TEST *TRACTION REPORT IR-4928207 *CALLED ROTARY SUPERINTENDENT TO DISCUSS *CHANGE OUT HCR KILL AND RE-TEST BETWEEN TEST JOINTS *BARRIERS FOR HCR KILL REMOVAL: • ITESTED BOP TESTED CLOSED MANUAL VALVE,STATIC KWF COLUMN MONITORED THROUGH THE IA 08:30 - 10:30 2.00 BOPSUR P PROD1 INSPECT TEST PLUG I-AFTER TROUBLE SHOOTING SURFACE EQUIPMENT SUSPECT TEST PLUG -FMC BACK OUT LDS BRING TEST PLUG TO SURFACE AND INSPECT SEAL-NO VISIBLE DAMAGE -TEST PLUG SHOWING LDS GROOVES INDICATING LDS WERE 0.5"LOWER ON TEST PLUG THAN INTENDED -FLUSH BOPS -CHANGE OUT TEST PLUG AND TEST JOINT ASSEMBLY ***NEAR MISS EQUIPMENT DAMAGE • TRACTION REPORT IR-4928202 Printed 2/23/2015 11:31:49AM North America-ALASKA-BP 4110 Page 46 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:OOAM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:30 - 14:00 3.50 BOPSUR P PROD1 FINISH TESTING 13-5/8",4 PREVENTER BOP AND RELATED EQUIPMENT WITH 4 1/2"TEST JOINT -TEST BOP ACCORDING TO AOGCC REGULATIONS AND PARKER PROCEDURES TEST VBRS WITH 4-1/2"TEST JOINTS. -SEE ATTACHED DOCUMENTATION -JOHN CRISP OF AOGCC WAIVED WITNESS OF BOP TEST 14:00 - 15:30 1.50 BOPSUR P PROW RIG DOWN TEST EQUIPMENT -REMOVE TEST PLUG INSTALL 7.25"WEAR RING FMC ENGAGE 4 LDS -R/D TEST ASSEMBLIES -BLOW DOWN CHOKE AND KILL LINES -CLEAN AND CLEAR RIG FLOOR 15:30 - 17:30 2.00 DRILL P PROD1 PICK UP SLB 6.125"ARCHER RSS DRILLING BHA#12 MAKE UP DRILLING BHA#12 PER SLB -SURFACE TEST ARCHER AT 25 AND 50 PERCENT PAD PRESSURE PER SLB PROCEDURE -LOAD SOURCE PER MWD RIH WITH BHA -6.125"PDC BIT,4-3/4"ARCHER RSS,PD FLEX COLLAR,PD E-MAG RECEIVER, IMPULSE MWD,4-3/4"IN LINE STABILIZER, ADNVISION 475,(3)FLEX COLLAR, CROSSOVER SUB, -OAL OF BHA =179.09' 17:30 - 20:30 3.00 DRILL N DFAL 1,500.00 PROD1 RIH WITH 6.125"DRILLING BHA#12 FROM 179' MD TO 1500'MD -RIH ON ELEVATORS WITH 4"DP FROM DERRICK -RIH AND SHALLOW HOLE TEST MWD TOOL AT 1500'MD-FAIL -IMPULSE TOOL NOT TURNING ON -CALL SLB TOWN TO DISCUSS -PERFORM ANTI JAMMING PROCEDURE,NO SUCCESS -REDUCE PULSATION DAMPENER PRESSURE FROM 700 PSI TO 500 PSI-NO SUCCESS -CHECK SLB SURFACE ELECTRONIC EQUIPMENT -CALL ODE TO DISCUSS -DECISION TO POOH AND RUN BACK UP IMPULSE 20:30 - 22:00 1.50 DRILL N DFAL 1,500.00 PROD1 PULL OUT OF HOLE WITH ARCHER RSS FROM 1500'MD TO 179'MD DUE TO FAILED IMPULSE -MONITOR WELL FOR 10 MIN:STATIC -POH ON ELEVATORS -STAND 4"DP IN DERRICK -MONITOR TRIP VIA TRIP TANK:PROPER DISPLACEMENT MUD WEIGHT IN&OUT=9.0 PPG Printed 2/23/2015 11:31:49AM III North America-ALASKA-BP Ili, Page 47 of 55 Operation Summary Report Common Well Name:L-01 — _ AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual©95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:00 - 00:00 2.00 DRILL N DFAL 1,500.00 PROD1 LAY DOWN BHA#12 DUE TO FAILED SLB IMPULSE -MONITOR WELL 10 MIN PRIOR TO PULLING BHA THRU STACK: WELL IS STATIC -LAY DOWN 6.125"DRILLING BHA#12 PER SLB DD -REMOVE SOURCE PER SLB MWD BIT GRADE 0-0-NO-A-X-I-NO-DTF 2/10/2015 00:00 - 00:30 0.50 DRILL N DFAL 1,500.00 PROD1 RIG SERVICE SERVICE TOP DRIVE SERVICE PS-21 SLIPS 00:30 - 04:00 3.50 DRILL N DFAL 1,500.00 PROD1 WAIT ON IMPULSE TOOL PROGRAMMING -WARM UP BACK UP IMPULSE IN TOOL SHED -PROGRAM AND SURFACE TEST IMPULSE SIMOPS: -M/U 6.125"SMITH PDC BIT TO BACK UP ARCHER -SURFACE TEST ARCHER AT 25 AND 50 PERCENT PAD PRESSURE PER SLB PROCEDURE 04:00 - 05:30 1.50 DRILL N DFAL 1,500.00 PROD1 PICK UP SLB 6.125"ARCHER RSS DRILLING BHA#13 -MAKE UP DRILLING BHA#13 PER SLB -LOAD SOURCE PER MWD -RIH WITH BHA -6.125"PDC BIT,4-3/4"ARCHER RSS,PD FLEX COLLAR,PD E-MAG RECEIVER, IMPULSE MWD,4-3/4"IN LINE STABILIZER, ADNVISION 475,(3)FLEX COLLAR, CROSSOVER SUB, -OAL OF BHA =179.48' 05:30 - 07:30 2.00 DRILL N DFAL 1,500.00 PROD1 RIH WITH 6.125"DRILLING BHA#13 FROM 179' MD TO 1500'MD -RIH ON ELEVATORS WITH 4"DP FROM DERRICK -BREAK CIRCULATION EVERY 15 STANDS -RIH AND SHALLOW HOLE TEST MWD TOOL AT 1500'MD-PASS -MONITOR TRIP VIA TRIP TANK:PROPER DISPLACEMENT 07:30 - 17:00 9.50 DRILL P PROD1 RIH WITH 6.125"DRILLING BHA#13 FROM 1500'MD TO 11,455'MD -RIH ON ELEVATORS WITH 4"DP FROM DERRICK -OBTAIN SLOW PUMP RATES AT 11,033'MD -SURVEY AT 11175',11206',11240',11280', 11332'MD WITH BHA 13 FOR CORRELATION -ARCHER CIRCULATION EVERY 15 STANDS FOR 8 MIN,240 GPM,1490 PSI -TAG BRIDGE AT 11,450'MD -ATTEMPT TO WORK PASS BRIDGE ON ELEVATORS WITH NO SUCCESS -MONITOR TRIP VIA TRIP TANK:PROPER DISPLACEMENT Printed 2/23/2015 11:31:49AM • North America-ALASKA-BP • Page 48 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:00 - 17:30 0.50 DRILL P PROD1 REAM FROM 11,455 MD TO 11,806'MD -260 GPM 2020 PSI -100 RPM 10K TORQUE ON,9K OFF -NO KINGAK SAMPLES IN BOTTOMS UP P/U 215K,S/O 135K,ROT 162K -MUD WEIGHT 8.9 PPG IN/9.0 PPG OUT 17:30 - 00:00 6.50 DRILL P PROD1 DRILL 6.125"PRODUCTION HOLE FROM 11,806'MD TO 11,957'MD(9020'TVD) -DRILL FROM 11,806'MD TO 11,829'MD STEERING 0 DEGREE OFFSET -ARCHER DROPPING AND NOT BUILDING ANGLE -CALL ODE TO DISCUSS -SUSPECT ARCHER INTERNAL HIGHSIDE OFFSET BY 120 DEGREES DRILL FROM 11,829'TO 11,859'MD AT 108 DEGREES LEFT OF 0 -TOOL RESPONDING AND BUILDING PROJECTED 8-10 DLS CONTINUE DRILL6.125"PRODUCTION HOLE FROM 11,859'MD TO 11,957'MD 260 GPM 2100 PSI ON -150 RPM 13K TORQUE ON,9K OFF SURVEY EVERY 30 FT MUD WEIGHT 9.0 PPG IN,9.0 PPG OUT -P/U 215K,S/O 135K,ROT 162K -TOTAL ROTATE TIME 2.54 HRS 2/11/2015 00:00 - 12:00 12.00 DRILL P PROD1 DRILL 6.125"PRODUCTION HOLE FROM 11,957'MD TO 12,457'MD -265 GPM 2075 PSI -140 RPM 14K TORQUE ON,10K OFF -SURVEY EVERY 30 FT -MUD WEIGHT 9.0 PPG IN,9.0 PPG OUT -P/U 210K,S/0 137K,ROT 162K BACKREAM 30'PRIOR TO CONNECTIONS -TOTAL ROTATE TIME 8.12 HRS Printed 2/23/2015 11:31:49AM •44X . Common Well Name L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site.PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time.6/8/2001 12:00:00AM Rig Release: Rig Contractor PARKER DRILLING CO. UWI:500292301100 Active datum L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 00:00 12.00 DRILL P PROD1 DRILL 6.125'PRODUCTION HOLE FROM 12,457'MD TO 13,125 MD -265 GPM 2150 PSI -140 RPM 14K TORQUE ON,10K OFF -AT 12,740'MD LOG INDICATING GEOLOGY CHANGE AND POSSIBLE FAULT -MUD LOSSES INCREASED TO 220 BBL/HR DYNAMIC LOSSES,6 BBL/HR STATIC LOSSES -PUMP 40 BBL OF 35 PPB DRILL AHEAD LCM PILL -DYNAMIC LOSS RATE DECREASE TO 135 BBL/HR -AT 12,870'MD PUMP 100 BBL OF 35 PPB DRILL AHEAD LCM PILL DYNAMIC LOSS RATE DECREASE TO 100-110 BBL/HR -AT 12,970'MD PUMP 100 BBL OF 35 PPB DRILL AHEAD LCM PILL -DYNAMIC LOSS RATE DECREASE TO 80-90 BBL/HR '-SURVEY EVERY 30 FT MUD WEIGHT 9.0 PPG IN,9.0 PPG OUT -P/U 215K,S/O 135K,ROT 163K -BACKREAM 60'PRIOR TO CONNECTIONS TOTAL ROTATE TIME 7.41 HRS *726 BBLS OF FLOPRO MUD LOST TO THE FORMATION LAST 24 HOURS 2/12/2015 00:00 - 12:00 12.00 DRILL P PROD1 DRILL 6.125"PRODUCTION HOLE FROM 13,125'MD TO 13,757'MD(8,956'TVD) -260 GPM 2280 PSI -140 RPM 12K TORQUE ON,9K TORQUE OFF SURVEY EVERY 30 FT -MUD WEIGHT 8.9 PPG IN,9.0 PPG OUT -P/U 218K,S/O 133K,ROT 163K BACKREAM 30-60'PRIOR TO CONNECTIONS LOSS RATE 90 BBL/HR -ACTUAL ROTATE TIME 6.7 HRS -PUMP 100 BBL 35 PPB LCM PILLAT 13,152' MD -LOSS RATE DECREASE TO 45-55 BBL/HR -PUMP 100 BBLS 35 PPB LCM PILLAT 13,343' MD LOSS RATE MAINTAINED AT 45-55 BBL/HR -PUMP 100 BBLS 35 PPB LCM PILLAT 13,533' MD -LOSS RATE MAINTAINED AT45-55 BBL/HR -DISCUSS WITH ODE LOSS CIRCULATION STRATEGY,ADD SAFE GARB 40 AND SAFE CARB 250 TO BACKGROUND LCM Printed 2/23/2015 11:31:49AM Operation Summary -epon` Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time'6/8/2001 12:00.00AM Rig Release: Rig Contractor.PARKER DRILLING CO. UWI:500292301100 Active datum.L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12'00 - 00:00 12.00 DRILL P PROD1 DRILL 6.125"PRODUCTION HOLE FROM 13,757'MD TO 14,384'MD(8,992'TVD) -260 GPM 2200 PSI -140 RPM 13K TORQUE ON,10K TORQUE OFF -SURVEY EVERY 30 FT MUD WEIGHT 8.9 PPG IN,9.0 PPG OUT -P/U 222K,S/O 130K,ROT 166K BACKREAM 30-60'PRIOR TO CONNECTIONS -ACTUAL ROTATE TIME 7.0 HRS LOSS RATE STEADY INCREASE FROM 55 BBL/HR TO 95 BBL/HR PUMP 100 BBL 35 PPB LCM PILL AT 14,020' MD -LOSS RATE DECREASED TO 80-85 BBL/HR -SLB ARCHER TOOL NOT COMMUNICATING, PERFORM ANTI-JAMMING PROCEDURE PUMPING 40 BBL LOW VIS/40 BBL HIGH VIS, TOOL COMMUNICATION REESTABLISHED -PUMP 100 BBL 35 PPB LCM PILL AT 14,300' MD -LOSS RATE DECREASED TO 65-75 BBL/HR *1404 BBLS OF FLOPRO MUD LOST TO THE FORMATION LAST 24 HOURS 2/13/2015 00:00 - 07:00 7.00 DRILL P PROD1 DRILL 6.125"PRODUCTION HOLE FROM 14,384'MD TO 14,730'MD(8,956'TVD) -260 GPM 2290 PSI -140 RPM 13K TORQUE ON,10K TORQUE OFF -SURVEY EVERY 30 FT -MUD WEIGHT 8.9 PPG IN,9.0 PPG OUT -P/U 225K,S/O 133K,ROT 165K -BACKREAM 20-30'PRIOR TO CONNECTIONS -LOSS RATE INCREASED FROM 65-75 BBL/HR TO 85-90 BBL/HR -ACTUAL ROTATE TIME 5.02 HRS -PUMP 100 BBL 35 PPB LCM PILLAT 14,475' MD -LOSS RATE DECREASE TO 65-70 BBL/HR 07:00 - 09:30 2.50 DRILL P PROD1 CIRCULATE BOTTOMS UP 2 TIMES 260 GPM,2160 PSI -140 RPM -RECIPROCATE PIPE 60' -PUMP 100 BBLS 35 PPB LCM FOR FIRST BOTTOMS UP -LOSS RATE 65 BBL/HR 09:30 - 12:00 2.50 DRILL P PROD1 PUMP OUT OF HOLE WITH 6.125"DRILLING BHA FOR SHORT TRIP FROM TD AT 14,730'MD TO 13,631'MD -MONITOR WELL FOR 10 MINUTES:WELL STATIC -MUD WEIGHT 8.9 PPG IN,9.0 PPG OUT -P/U 225K S/O 133KAT 14,730'MD -210 GPM,1375 PSI 12.00 - 16.00 4.00 DRILL P PROD1 BACKREAM OUT OF HOLE FROM 13,631'MD TO 11,833'MD -100 RPM,8-10K TORQUE,160K ROTATING WEIGHT -260 GPM,2000 PSI -P/U 200K,3/0 135K AT 13,631'MD -BACKREAMING SPEEDS FROM 750 FT/HR TO 1000 FT/HR Printed 2/23/2015 11'31:49AM • North America-ALASKA-BP • Page 51 of 55 Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 1X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:00 - 18:00 2.00 DRILL P PROD1 MAD PASS LOG FROM 11,833'MD TO 11,442' MD -LOG AT 350'/HR AS PER SLB MWD -100 RPM,7-9K TORQUE -220 GPM,1550 PSI 18:00 - 20:30 2.50 DRILL P PROD1 MAD PASS LOG FROM 11,442'MD TO 7"SHOE AT 11,033'MD LOG AT 350'/HR AS PER SLB MWD -220 GPM,1550 PSI -0 RPM AS PER DOG LEG ROTATION LIMITATIONS P/U 200K,S/O 135K AT 11,442'MD 20:30 - 22:00 1.50 DRILL P PROD1 CIRCULATE 2X BOTTOMS UP AT 11,033'MD '-260 GPM,1880 PSI -80 RPM,6K TORQUE -RECIPROCATE 40 FT P/U 190K,S/O 145K AT 11,033'MD -CLEAN RETURNS 22:00 - 22:30 0.50 DRILL P PROD1 RIG SERVICE -CHECK TOP DRIVE HYDRAULIC OIL 1-SERVICE TOP DRIVE BLOCKS -INSPECT SAVER SUB WITH THREAD GAUGE !AND M/U TOOL 8-1/2 TURNS TO M/U AND 2-1/2"SHOULDER ;GAP SHARP THREADS ON SAVER SUB AND LIGHT GAP ON THREAD GAUGE -DECISION TO CHANGE OUT SAVER SUB PRIOR TO LINER RUN,280 CONNECTIONS MONITOR WELL:WELL LOSING 1-3 BBL/HR 22:30 - 00:00 1.50 DRILL P PROD1 CHANGE OUT SAVER SUB -PJSM WSLAND PARKER -CHANGE OUT 6-5/8 X 4"XT-39 SAVER SUB MONITOR WELL:WELL LOSING 1-3 BBL/HR **1260 BBLS OF FLOPRO MUD LOST TO THE FORMATION LAST 24 HOURS* 2/14/2015 00:00 - 03:00 3.00 DRILL P PROD1 RUN IN HOLE WITH 6.125"DRILLING BHA FROM 7"CASING SHOE AT 11,033'MD TO 13,500'MD 1-MONITOR WELL FOR 10 MIN:WELL LOSING 1-3 BBL/HR -RIH ON ELEVATORS WITH 4"DP STANDS FROM DERRICK BREAK CIRCULATION EVERY 1,500'MD,140 GPM,747 PSI -P/U 218K,S/O 128KAT 13,450'MD I-ENCOUNTER TIGHT SPOT AT 13,500'MD, 20K DOWN,NO GO,INCREASE IN 10K INCREMENTS UP TO 60K DOWN,NO GO -TIGHT SPOT CORRELATES TO REVERT POINT IN EILEEN -MONITOR WELL VIA TRIP TANK:WELL TAKING EXTRA 3-4 BBL PER 5 STANDS Printed 2/23/2015 11:31.49AM • North America-ALASKA.-BP • Page 52 of 55 X a � Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 04:30 1.50 DRILL P PROD1 ATTEMPT TO WORK PAST BRIDGE AT 13,500' MD -STAGE UP TO 260 GPM AND 2100 PSI,NO ROTATION,ATTEMPT TO WASH THRU, PRESSURE INCREASE 300 PSI TO 2400 PSI, PACKING OFF AND TAKING WEIGHT -PICKUP AND ROTATE AT 20 RPM,10K TORQUE,STAGE PUMPS UP TO 260 GPM, 2100 PSI,ATTEMPT TO WORK THRU, PACKING OFF -INCREASE TO 40 RPM,11K TORQUE, 260 GPM,2100 PSI,ATTEMPT TO WORK THRU, PACKING OFF -INCREASE TO 80 RPM,12K TORQUE,260 GPM,2100 PSI,ATTEMPT TO WORK THRU, PACKING OFF -INCREASE TO 140 RPM,12K TORQUE,260 GPM,2100 PSI,WASH DOWN TO 13,503'MD, BIT WEIGHT INCREASE TO 10-15K,STOP AND PULL OFF BOTTOM -RIH WITH PUMPS ON AT 260 GPM,2100 PSI, NO ROTATION,PRESSURE STABLE BUT BIT TAKING 20-30K DOWN AT 13,503'MD ATTEMPT TO RIH ON ELEVATORS,13,503' MD STACK UP TO 70K DOWN,NO SUCCESS I-PICKUP WEIGHT SHOWING 10-15K OVER, PICKUP 30 FT AND STAGE UP PUMPS FOR CIRCULATION 04:30 - 05:30 1.00 DRILL P PROD1 CIRCULATE BOTTOMS UP -260 GPM,2020 PSI -40 RPM,9K TORQUE -RECIPROCATE PIPE 60 FT 05:30 - 08:00 2.50 DRILL P PROD1 WORK PAST BRIDGE AT 13,500'MD -RIH ON ELEVATORS,13,503'MD STACK UP TO 60K DOWN,NO SUCCESS -STAGE PUMPS UP TO 260 GPM AND 2100 PSI,NO ROTATION,PRESSURE STABLE, STACK UP TO 50K,NO SUCCESS -ROTATION SET AT 140 RPM,12K TORQUE, STAGE PUMPS UP TO 260 GPM,2100 PSI -STACK UP TO 30K BIT WEIGHT,ABLE TO WORK THRU -WORK FULL STAND THRU MULTIPLE TIMES 08.00 - 10:00 2.00 DRILL P PROD1 RUN IN HOLE WITH 6.125"DRILLING BHA FROM 13,535'MD TO TD AT 14,730'MD -MONITOR WELL FOR 10 MIN:WELL LOSING 1-3 BBUHR RIH ON ELEVATORS WITH 4"DP STANDS FROM DERRICK -BREAK CIRCULATION EVERY 1,500'MD,140 GPM,747 PSI ONE TIGHT SPOT AT 14,245'MD TO 14,290' MD,STACK 20K,WIPE CLEAN -REAM LAST 30 FT DOWN AT 260 GPM,2150 PSI,140 RPM,12K TORQUE -MONITOR WELL VIA TRIP TANK:WELL 'TAKING AN EXTRA 3-4 BBL PER 5 STANDS -DISCUSS WITH ODE TIGHT SPOT MITIGATION STRATEGY Printed 2/23/2015 11:31:49AM - 53 of 55 North America ALASKA BP • Page Operation Summary Report Common Well Name L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 12:00 2.00 DRILL P PROD1 CIRCULATE BOTTOMS UP 260 GPM,2075 PSI -140 RPM,10 K TORQUE -RECIPROCATE PIPE 60 FT -PUMP 100 BBL 35 PPB DRILL AHEAD PILL 12:00 - 14:00 2.00 DRILL P PROD1 CIRCULATE AND CONDITION MUD -CIRCULATE LCM PILL OUT OF HOLE CONDITION MUD WITH CLAY GUARD AS PER ODE/MI DISCUSSIONS 260 GPM,2050 PSI -140 RPM -TORQUE CONTINUALLY INCREASE FROM 10KTO18K 14:00 - 14:30 0.50 DRILL P PROD1 RIG SERVICE -LUBRICATE RIG -CLEAN AND CLEAR RIG FLOOR 14:30 - 18:00 3.50 DRILL P PROD1 POH WITH 6.125"DRILLING BHA FOR SHORT TRIP FROM TD AT 14,730'MD MONITOR WELL FOR 10 MINUTES:WELL i i I STATIC -MUD WEIGHT 8.9 PPG IN,9.0 PPG OUT I i �-P/U 225K S/0 133KAT 14,730'MD ATTEMPT TO POH ON ELEVATORS,30K OVERPULL -ATTEMPT TO PUMP OUT OF HOLE AT 210 GPM,40K OVERPULL -DISCUSS WITH ODE -BACKREAM OUT OF HOLE FROM 14.730'MD TO 13,914'MD -260 GPM,2000 PSI -140 RPM,TORQUE 17K,STEADILY INCREASED TO 20K -BACKREAMING SPEEDS FROM 750 FT/HR TO 1000 FT/HR -DISCUSS HIGH TORQUE WITH ODE -DECIDE TO CIRCULATE AND CONDITION MUD WITH 1%LUBRICANTS 18:00 - 20:00 2.00 DRILL P PROD1 CIRCULATE AND CONDITION MUD -ADD LUBRICANTS UP TO 1%TO MUD • SYSTEM -260 GPM,1800 PSI 1-140 RPM,19.5K TORQUE -RECIPROCATE FULL STAND -TORQUE REDUCED FROM 20K TO 10K 20:00 - 21:30 1.50 DRILL P PROD1 BACKREAM OUT OF HOLE WITH 6.125" DRILLING BHA FROM 13,914'MD TO 13,440' MD -140 RPM,10-11K TORQUE,162K ROTATING WEIGHT -260 GPM,1800 PSI -BACKREAMING SPEEDS FROM 750 FT/HR TO 1000 FT/HR -WORK STRING THRU 13,510'MD TO 13,480' MD,STACK 30K TO WORK THRU 21:30 - 22:30 1.00 DRILL P PROD1 SPOT 25 BBL HIGH VIS PILL ACROSS TIGHT SPOT IN EILEEN FROM 13,640'MD TO 13,000' MD -260 GPM,1800 PSI I-40 RPM,8K TORQUE -LEFT 8 BBL IN DRILL STRING -PUMP AND PULL AT 84 GPM,90FT/MIN Printed 2/23/2015 11:31:49AM • North America ALASKA-BP Page 54 of 55 Operation Summary Report • Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/11/2015 End Date:2/16/2015 1X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00.00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth ! Phase Description of Operations (hr) (usft) 22:30 - 00:00 1.50 DRILL P PROD1 PUMP OUT OF HOLE WITH 6.125"DRILLING BHA FROM 13,640'MD TO 12,777'MD -MONITOR WELL:WELL STATIC -ATTEMPT TO PULL ON ELEVATORS,HOLE SWABBING -PUMP OUT OF HOLE AT 84 GPM, 270 PSI -P/U 205K S/O 130K -NO OVERPULL OBSERVED WHILE PUMP OUT OF HOLE **1089 BBLS OF FLOPRO MUD LOST TO THE FORMATION LAST 24 HOURS* 2/15/2015 00:00 - 03:00 3.00 DRILL P PROD1 PUMP OUT OF HOLE WITH 6.125"DRILLING BHA FROM 12,777'MD TO 11,033'MD -ATTEMPT TO PULL ON ELEVATORS AT 11,777'MD,HOLE STILL SWABBING -84 GPM,270 PSI P/U 200K S/O 130K -TIGHT SPOTS AT 12,290'MD AND 12,370'MD, TOOK 20K TO WIPE THRU 03:00 - 03:30 0.50 DRILL P PROD1 RIG SERVICE -SERVICE TOP DRIVE -SERVICE PS-21 SLIPS DERRICK INSPECTION 03:30 - 04:30 1.00 DRILL P PROD1 CIRCULATE BOTTOMS UP 2X -260 GPM,2020 PSI -40 RPM,9K TORQUE -RECIPROCATE PIPE 60 FT 04:30 - 07:30 3.00 DRILL P PROD1 RUN IN HOLE WITH 6.125"DRILLING BHA FROM 7"CASING SHOE AT 11,033'MD TO TD AT 14,730'MD -MONITOR WELL FOR 10 MIN:WELL STATIC RIH ON ELEVATORS WITH 4"DP STANDS FROM DERRICK -BREAK CIRCULATION EVERY 1,500'MD,140 GPM,700 PSI -P/U 210K,S/O 128K -TIGHT SPOT AT 12,180'MD,TAKING 20K, 1 WIPE THRU TWICE -TIGHT SPOT IN EILEEN AT 13,551'MD, TAKING 25K,WORK THRU 1-MONITOR WELL VIA TRIP TANK:WELL TAKING EXTRA 4-6 BBL PER 5 STANDS -WASH DOWN LAST STAND,NO FILL ENCOUNTERED 07:30 - 10.00 2.50 DRILL P PROD1 CIRCULATE BOTTOMS UP 3X -260 GPM,2090 PSI -100 RPM,9K TORQUE,ROTATING WEIGHT 160K -RECIPROCATE PIPE 60 FT -WELL LOSING 60 BBUHR 10:00 - 11:00 1.00 DRILL P PROD1 PUMP 290 BBLS OF LINER RUNNING PILL 260 GPM,2100 PSI -100 RPM,9K TORQUE -RECIPROCATE PIPE 60 FT -WELL LOSING 60 BBUHR -PUMP 150 BBLS,LEAVE 140 BBLS IN DRILL STRING I - Printed 2/23/2015 11.31 49AM • North America-ALASKA-BP • Page 55 of 55 • Operation Summary Report Common Well Name:L-01 AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:1/11/2015 End Date:2/16/2015 X3-015PL-C:(9,505,904.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12.00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 11:00 - 17:00 6.00 DRILL P PROD1 PULL OUT OF HOLE WITH 6.125"DRILLING BHA FROM 14,730'MD TO 11,033'MD -PULL ON ELEVATORS FROM 14,730'MD TO 14,588'MD -INDICATIONS OF HOLE SWABBING PUMP OUT OF HOLE FROM 14,588'MD TO 111,033'MD I-84 GPM,440 PSI -P/U 200K S/O 130K -MONITOR WELL VIA TRIP TANK:WELL TAKING AN ADDITIONAL 4-6 BBL PER 5 STANDS 17:00 20:00 3.00 DRILL P PROD1 CIRCULATE STEEL LUBE PILL -CIRCULATE BOTTOMS UP ,-CIRCULATE 20 BBL STEEL LUBE SWEEP SURFACE TO SURFACE -260 GPM,2090 PSI 100 RPM,BK TORQUE -RECIPROCATE PIPE 60 FT -P/U 190K,S/0 145K _ 20:00 - 00:00 4.00 DRILL P PROD1 PULL OUT OF HOLE WITH 6.125"DRILLING BHA FROM 11,033'MD TO 6500'MD -MONITOR WELL FOR 10 MINUTES:WELL STATIC -ATTEMPT TO PULL ON ELEVATORS,HOLE SWABBING PUMP OUT OF HOLE FROM 11,033'MD TO '9,800'MD -84 GPM,300 PSI 1-P/U 175K,S/O 150K WELL TAKING 2-3 BBL/HR POH ON ELEVATORS FROM 9,800'MD TO 16,500'MD -MUD WEIGHT:8.9 PPG IN,8.9 PPG OUT -P/U 130K,S/O 100K RACK BACK 4"DP IN DERRICK MONITOR WELL VIA TRIP TANK:WELL TAKING 3 BBLS OVER PROPER DISPLACMENT FOR 5 STANDS 2/16/2015 00:00 - 04:00 4.00 DRILL P PROD1 I POH ON ELEVATORS FROM 6,500'MD TO 180' 'MD -MUD WEIGHT:8.9 PPG IN,8.9 PPG OUT -P/U 130K,S/0 100K -RACK BACK 4"DP IN DERRICK L/D HWDP AND JARS MONITOR WELL VIA TRIP TANK:WELL TAKING 3 BBLS OVER PROPER DISPLACEMENT FOR 5 STANDS 04:00 - 04:30 0.50 DRILL P PROD1 FUNCTION TEST BOPS AS PER AOGCC 7 DAY REQUIREMENT 04.30 - 07:00 2.50 DRILL P PROD1 t LAY DOWN SLB 6.125"BHA#13 -MONITOR WELL 10 MIN PRIOR TO PULLING BHA THRU STACK:WELL LOSING 2-3 BBL/HR -LAY DOWN 6.125"DRILLING BHA#13 PER SLB DD -REMOVE SOURCE PER SLB MWD -BIT GRADED 1-1-BT-T-X-I-ER-TD ***SWITCH TO CON EVENT AT 7:00 AM" Printed 2/23/2015 11:31.49AM • • North America-ALASKA BP ` %'4`. Page 1 of 7 Operation Summary Report' N' Common Well Name:L-01 1 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/16/2015 End Date:2/19/2015 X3-015PL-C:(4,208,555.00) L Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase i Description of Operations hr 2/16/2015 07:00 - 07:30 0.50 CASING ! P (usft) RUNPRD RIG SERVICE -LUBRICATE RIG,PS-21'S,TRAVELING BLOCK ASSEMBLY 07:30 - 08:30 I 1.00 CASING P RUNPRD RIG UP TO RUN 4.5"LINER AND SWELL I ;PACKER COMPLETION ,-CLEAN AND CLEAR RIG FLOOR I -CHANGE OUT PS-21 SLIP SEGMENTS TO 4.5" CHANGE OUT BX INSERTS TO 4.5" 08:30 - 17:00 8.50 CASING P , RUNPRD PJSM TO RUN 4.5"LINER&SWELL PACKER COMPLETION RUN 4.5",12.6#,13CR85,HYDRIL 521 LINER ,FROM SURFACE TO 3,822'MD [-CHECK FLOATS -USE JET LUBE SEAL GUARD ON CONNECTIONS -TORQUE TURN ALL HYDRIL CONNECTIONS 1 [TO 4700 FT-LBS -RUN 1 CENTRALIZER ON JOINTS 1-72 -FILL LINER ON THE FLY AND TOP OFF EVERY 10 JOINTS S/O=54KAT 1,608'MD --f-- 17:00 - 18.00 1.00 CASING P RUNPRD MAKE UP LINER HANGER/PACKER ASSEMBLY 1 -MAKE UP BAKER HRD-E ZXP 7"X 4.5"LINER ,HANGER. I 1-BAKER REP MIX PAL-MIX AND PLACE IN LINER TOP PACKER _ -CHANGE OUT BX ELEVATORS,PS-21 SLIPS 18:00 - 19:00 I 1.00 CASING P RUNPRD r CIRCULATE 1.5 X LINER VOLUME I -P/U 1ST JT OF 4"XT-39 DP,RIH TO 4,034'MD -STAGE PUMPS UP IN 1 BBLS INCREMENTS TO 4 BPM -1 BPM,120 PSI -2 BPM,200 PSI -3 BPM,260 PSI -4 BPM,370 PSI -P/U 70K,S/O 70K AT 2 BBL/MIN -WELL LOSING 60-70 BBL/HR 19:00 - 00:00 5.00 CASING P t RUNPRD RUN 4.5",12.6#,13CR85,HYDRIL 521 LINER FROM 4,034'MD TO 10,964'MD -RUN 4"DP ON ELEVATORS FROM DERRICK -FILL EVERY 10 STANDS -P/U 175K,S/0 130KAT 10,964'MD ,24 HR LOSSES:384 BBLS 2/17/2015 00:00 - 00:30 0.50 CASING P i RUNPRD RUN 4.5",12.6#,13CR85,HYDRIL 521 LINER 1 i FROM 10,964'MD TO 11,033'MD -RUN 4"DP ON ELEVATORS FROM DERRICK -FILL EVERY 10 STANDS -P/U 175K,S/0 130KAT 10,964'MD Printed 2/23/2015 11:32:22AM • North America-ALASKA-BP • ; `, Page 2 of 7 Operation Summary Report ` Common Well Name:L-01 AFE No Event Type:COM-ONSHORE(CON) Start Date.2/16/2015 End Date.2/19/2015 X3-015PL-C:(4,208,555.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual 195.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT [ NPT Depth Phase Description of Operations (hr) - (usft) 00:30 - 01:30 1.00 CASING P RUNPRD CIRCULATE AND ESTABLISH PARAMETERS AT CASING SHOE -1 BPM=280 PSI -2 BPM=365 PSI -3 BPM=460 PSI -4 BPM=660 PSI CIRCULATE 1.5X LINER AND DP VOLUME 4 BPM,660 PSI,8%FLOW -MUD WEIGHT IN:8.9 PPG,MUD WEIGHT OUT:8.9 PPG -ESTABLISH ROTATING PARAMETERS PRIOR TO EXITING 7"CASING SHOE -10 RPM=5.3K,ROT 145K -20 RPM=5.4K,ROT 145K 01 30 - 04:00 2.50 CASING P RUNPRD RUN 4.5",12.6#,13CR85,HYDRIL 521 LINER FROM 11,033'MD TO 14,730'MD -RUN 4"DP ON ELEVATORS FROM DERRICK -FILL EVERY 10 STANDS -SPACE OUT SHOE 2 FT FROM BOTTOM AT 14,728'MD 04:00 - 04:30 0.50 CASING P RUNPRD CIRCULATE OPEN HOLE VOLUME -STAGE PUMPS UP TO 4 BPM -1 BPM=450 PSI -2 BPM=760 PSI 3 BPM=970 PSI -4BPM=1040 PSI -MUD WEIGHT:8.9 PPG IN,8.9 PPG OUT 04:30 - 06:00 1.50 CASING P RUNPRD PJSM DROP BALL TO SET BAKER ZXP LINER TOP PACKER -PUMP 35 BBL 8.9 PPG HI-VIS PILL -AFTER 15 BBLS AWAY,DROP 1.25" PHENOLIC BALL PER BAKER -CHASE WITH 20 BBLS HI-VIS SWEEP, FOLLOWED BY 8.9 PPG MUD -PUMP 143 BBLS 8.9 PPG FLO-PRO -SET LTP PER BAKER REP 06:00 - 06:30 0.50 CASING P RUNPRD SET BAKER HRD-E ZXP PACKER. -PRESSURE UP TO 3150 PSI TO SET LINER HANGER. -SLACK-OFF 50K TO CONFIRM HANGER SET. -INCREASE PRESSURE TO 4100 PSI TO RELEASE HRD-E LINER RUNNING TOOL. -PICK UP 5'TO EXPOSE DOG SUB. SLACK-OFF SET. -CONFIRM SET BY ROTATING 15 RPM,5K TORQUE TOLAT 10,867'MD _. Printed 2/23/2015 11.32:22AM • North America-ALASKA-BP • , • Page 3 of• Operation Summary Report Common Well Name:L-01 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/16/2015 End Date 2/19/2015 X3-015PL-C:(4,208,555.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual(95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth I Phase Description of Operations (hr) (usft) 06:30 - 08:00 1.50 CASING P RUNPRD PJSM,MIT 7"L-80 26#CASING AND BAKER 7" X 4-1/2"LINER TOP -RIG UP TO PRESSURE TEST -LINE UP TO KILL LINE AND FLUID PACK LINES -CLOSE UPPER RAMS -250 PSI LOW FOR 5 MIN,3500 PSI HIGH FOR 30 MIN CHARTED TEST MEETS BP STP CRT-AK-10-45 CRITERIA -RECEIVED PERMISSION TO PROCEED FROM WTL BLEED OFF PRESSURE -R/D TEST EQUIPMENT -TEST CHARTS ATTACHED 08:00 - 09:00 1.00 CASING P RUNPRD DISPLACE WELL TO 9.4 PPG BRINE UNSTING FROM LINER TOP ABOVE TOP OF LINER AT 10,867 MD -MARK NO-GO ON PIPE -DISPLACE FROM 8.9 PPG FLO-PRO TO 9.4 PPG BRINE PUMP 30 BBL HI-VIS SWEEP 9.4 PPG BRINE SURFACE TO SURFACE -PUMP 540 GPM,2716 PSI -MONITOR WELL FOR 10 MIN:WELL STATIC 09:00 - 09:30 0.50 CASING , P RUNPRD :RIG SERVICE GREASE TOP DRIVE AND CROWN -CLEAN OUT UNDER SHAKERS 09:30 - 13:30 4.00 CASING P RUNPRD PULL OUT OF HOLE WITH LINER RUNNING TOOL -POOH FROM 10,900'MD TO 7,900'MD -PULL OUT OF HOLE ON ELEVATORS LAY DOWN 4"DRILL PIPE 1 X 1 IN PIPE SHED -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT -P/U 186K,S/O 139K AT 10,800'MD 13:30 - 15:00 1.50 CASING P RUNPRD CUT AND SLIP DRILL LINE -CUT 90'OF DRILL LINE,10.5 WRAPS -CALIBRATE BLOCKS -CALIBRATE BLOCK HEIGHT WITH SLB MWD 15 00 - 00:00 9.00 CASING P RUNPRD PULL OUT OF HOLE WITH LINER RUNNING TOOL -POOH FROM 7,900'MD TO SURFACE PULL OUT OF HOLE ON ELEVATORS -LAY DOWN 4"DRILL PIPE 1 X 1 IN PIPE SHED -MONITOR WELL VIA TRIP TANK PROPER DISPLACEMENT P/U 145K,S/O 110K AT 7,900'MD PSJM WITH BAKER,PARKER,BP PRIOR TO PULLING LINER RUNNING TOOL -LAY DOWN XO,BUMPER SUB,AND LINER RUNNING TOOL PER BAKER REP -CLEAN AND CLEAR RIG FLOOR **24 HOUR LOSSES:214 BBLS Printed 2/23/2015 11:32:22AM North America-ALASKA-BP Page 4 of7`, Operation Summary Report Common Well Name:L-01 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/16/2015 End Date:2/19/2015 X3-015PL-C:(4,208,555.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/18/2015 00:00 - 02:30 2.50 RUNCOM P RUNCMP RIG UP TO RUN 4-1/2"12.6#13CR-85 VAM TOP COMPLETION -MAKE UP WEAR RING RUNNING TOOL -PULL WEAR RING -CHANGE OUT PS-21 INSERTS FROM 4"TO 4-1/2" -CHANGE OUT 4"DRILL PIPE ELEVATORS TO 4-1/2"MANUAL ELEVATORS RIG UP 4-1/2"DOYON CASING TONGS 02:30 - 03:30 1.00 RUNCOM P RUNCMP PJSM RUN 4-1/2"12.6#13CR-85 VAM TOP COMPLETION WITH DOYON AND HES MAKE UP WLEG TO X NIPPLE WITH RHC-M PLUG -MAKE UP 7"X 4-1/2"HES TNT PACKER TO X-NIPPLE -BAKER LOCK CONNECTIONS BELOW PACKER RUN IN HOLE TO-174 FT 03:30 - 12:00 8.50 RUNCOM P RUNCMP RUN IN HOLE WITH COMPLETION FROM 174' MD TO 7,027 MD -RIH WITH 4-1/2"12.6#13CR-85 VAM TOP 'TUBING PICK UP SINGLES FROM PIPE SHED TORQUE TURN TO 4,440 FT/LBS -USE JET LUBE SEAL GUARD ON VAM TOP THREADS -P/U=105K,S/O=86K -MONITOR TRIP VIA TRIP TANK WELL IS STATIC 12:00 - 16:00 4.00 RUNCOM P RUNCMP RUN IN HOLE WITH COMPLETION FROM 7,027'MD TO 10,786'MD -RIH WITH 4-1/2"12.6#13CR-85 VAM TOP TUBING -PICK UP SINGLES FROM PIPE SHED -TORQUE TURN TO 4,440 FT/LBS USE JET LUBE SEAL GUARD ON VAM TOP THREADS -P/U=170K,S/O=105K -MONITOR TRIP VIA TRIP TANK WELL IS STATIC 16:00 - 17:30 1.50 RUNCOM P RUNCMP PJSM SPACE OUT AND LAND 4-1/2"12.6# 13CR-85 VAM TOP 12.6#,VAMTOP COMPLETION ASSEMBLY: -P/U JT 250,251 AND 252&BOTTOM OUT ON TIE BACK RECEPTICLE AT 10,878'MD -L/D JTS 251 AND 252 P/U LANDING JOINT&LAND STRING ON TUBING HANGER AT 10,874'MD,4'ABOVE NO-GO,&7'INSIDE TIE-BACK RECEPTACLE, NO SPACEOUT PUPS REQUIRED -LAND HANGER PER FMC REP -RIG DOWN AND LAY DOWN CASING EQUIPTMENT -PARKER 273 RKB TO UPPER LOCKDOWN SCREWS=43.52'MD. -FINAL PICKUP WEIGHT= 176 KLBS, SLACKOFF= 106 KLBS,PARKER 273 BLOCKS =35 KLBS Printed 2/23/2015 11:32:22AM North America-ALASKA-BP ` Page 5 of 7" Operation Summary Report Common Well Name:L-01 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/16/2015 End Date:2/19/2015 X3-015PL-C:(4,208,555.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual©95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 18:30 1.00 RUNCOM N HMAN RUNCMP FMC CHECK LOCKDOWN SCREWS -BACK OUT EACH LOCKDOWN SCREWAND INSPECT -DAMAGE TO TIP OF ALL LOCKDOWNS, REPLACE ALL LOCKDOWNS -LDS TORQUE 450 FT-LBS,GLANDS 450 FT-LBS 18:30 - 21:00 2.50 RUNCOM P RUNCMP PJSM REVERSE CIRCULATE COMPLETION FLUIDS RIG UP TO REVERSE CIRCULATE CIRCULATE DOWN IA WITH RETURNS UP TUBING -REVERSE 168 BBLS CLEAN HEATED 9.4 PPG BRINE AT 4 BPM 400 PSI '-REVERSE 143 BBLS CORROSION INHIBITOR 9.4 PPG BRINE -CHASE WITH 57 BBLS CLEAN HEATED 9.4 PPG BRINE -CIRCULATE 5 BBLS BOTH WAYS TO WASH OFF RHC PLUG **SIMOPS L/D 4"DP OFFLINE 21:00 - 22:30 1.50 RUNCOM P RUNCMP I PJSM SET HES TNT PACKER AND PRESSURE 'TEST -M/U LANDING JT -DROP BALL AND ROD PULL LANDING JT -CLOSE BLIND RAMS PRESSURE TEST 4.5"TUBING TO 250 PSI LOW FOR 5 MIN,3500 PSI HIGH FOR 30 MIN -80 PSI LOST IN 1ST 15 MINS,25 PSI LOST IN 2ND 15 MINS -DROP TUBING PRESSURE TO 2500 PSI -PRESSURE TEST ANNULUS TO 250 PSI LOW FOR 5 MIN,3500 PSI HIGH FOR 30 MIN 55 PSI LOST IN 1ST 15 MINS,15 PSI LOST IN 2ND 15 MINS -BOTH TESTS MEET BP STP CRT AK-10-45 CRITERIA -RECEIVED APPROVAL FROM WTL TO PROCEED -SEE ATTACHED CHART RIG DOWN TEST EQUIPMENT • 22:30 - 23:00 0.50 RUNCOM P RUNCMP SHEAR DCK VALVE -BLEED OFF TUBING PRESSURE FROM 2500 PSI TO 0 PSI -CONFIRM VALVE SHEAR -PUMP DOWN TUBING AT 2.5 BPM AND 900 PSI -CIRCULATE DOWN IA AT 2.5 BPM AND 700 PSI MONITOR WELL FOR 10 MINUTES:WELL IS STATIC "SIMOPS L/D 4"DP OFFLINE Printed 2/23/2015 11:32:22AM • North America-ALASKA-BP • Page 6 of 7 Operation Summary Report Common Well Name:L-01 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/16/2015 End Date:2/19/2015 X3-015PL-C:(4,208,555.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual©95.79usft(above Mean Sea Level) Date From-To I Hrs I Task Code NPT NPT Depth Phase I Description of Operations (hr) I (usft) 23:00 - 00:00 1.00 RUNCOM P RUNCMP PJSM PUMP DIESEL FREEZE PROTECT -RIG UP LINES FROM FREEZE PROTECT PUMP TO IA -PUMP 78 BBLS DIESEL DOWN IA TAKING BRINE RETURNS UP THE TUBING E-2 BPM,800 PSI -ALLOW TO U-TUBE FOR 1 HR **SIMOPS L/D 4"DP OFFLINE 2/19/2015 00:00 - 02:00 2.00 RUNCOM P RUNCMP ,PUMP DIESEL FREEZE PROTECT -PUMP 78 BBLS DIESEL DOWN IA TAKING BRINE RETURNS UP THE TUBING -2 BPM,800 PSI ALLOW TO U-TUBE FOR 1 HR -RIG DOWNS LINES FROM FREEZE PROTECT PUMP TO IA - 02:00 - 04:30 2.50 WHSUR P WHDTRE SET AND TEST TWO WAY CHECK -PJSM WITH FMC -DRY ROD IN TWC AS PER FMC REP LINE UP TO TEST TWC -TEST TWC FROM ABOVE 250 PSI LOW AND 3500 PSI HIGH FOR 5 CHARTED MINS EACH -TEST FROM BELOW 250 PSI LOW AND 3500 'PSI HIGH FOR 5 CHARTED MINS EACH 04:30 - 10:00 5.50 WHSUR P , WHOTRE NIPPLE DOWN BOP -PJSM -FLUSH BOPS -BLOW DOWN SURFACE LINES -DRAIN STACK -CLEAN CUTTINGS FROM FLOW BOX -REMOVE FLOW NIPPLE -NIPPLE DOWN BOP STACK AN SET ON STUMP -REMOVE RISER *BARRIERS TO N/D:KILL WEIGHT FLUID ON TOP OF BALLAND ROD IN X NIPPLE,TESTED TUBING,TESTED PRODUCTION PACKER AND ANNULUS,TESTED TWC. 10:00 - 15:00 5.00 WHSUR P WHDTRE NIPPLE UP ADAPTER FLANGE -CLEAN AND PREP HANGER VOID INSTALL NEW API RING INSTALL AND TORQUE ADAPTER FLANGE -PRESSURE TEST ADAPTER FLANGE TO 250 j PSI LOW FOR 5 MINUTES AND 5000 PSI HIGH FOR 30 MINUTES,CHARTED TESTS **SIMOPS** -BRIDLE UP BLOCKS IN PREP TO LOWER DERRICK Printed 2/23/2015 11:32:22AM North America-ALASKA-BP 11111 Page 7 of Operation Summary Report Common Well Name:L-01 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/16/2015 End Date:2/19/2015 X3-015PL-C:(4,208,555.00) Project:Prudhoe Bay Site:PB L Pad Rig Name/No.:PARKER 273 Spud Date/Time:6/8/2001 12:00:00AM Rig Release: Rig Contractor:PARKER DRILLING CO. UWI:500292301100 Active datum:L-01A actual @95.79usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:00 - 18:00 3.00 WHSUR P WHDTRE NIPPLE UP TREE -INSTALL NEW API RING -INSTALL AND TORQUE TREE RIG UP PRESSURE TESTING EQUIPMENT -PRESSURE TEST TREE TO 250 PSI LOW AND 5000 PSI HIGH FOR 5 MINUTES EACH, LEAK TIGHT TESTS -RIG DOWN PRESSURE TESTING EQUIPMENT -SUCK DIESEL OUT OF TREE -APPLY HEET TO TREE VOID PLACE 3 QUARTS OF HEET GASOLINE ANTIFREEZE IN TREE AROUND TWC -SECURE WELLHEAD AND CELLAR **SIMOPS** CONTINUE BRIDLE UP BLOCKS -RIG DOWN RIG FLOOR RIG RELEASED OFF L-01AAT 18:00 '02/19/2015 SWITCHED OVER TO 09-31 DI RON EVENT AT 18:00 02/19/2015 Printed 2/23/2015 11:32:22AM III III N O mmmv)cr oYnbE, n0N2b M(02m o mw0 (02woo mNNo d d°�.�mm O rp mOMN 0N0 b'0' O�r`a0Q7 <WNb 0022M pA W 1.-4Th NNYO OOMIhNQ Otim bhapp n�pN mObmA M_mM O• Nb$MN bQ Nw M mur 0nm � n`8 EMI m 0h W 00000 00 00 02222 MO mM mn EWE Nwn�pm N �?m W . C N N r Y Y N r r Y Q Y MMM M M M M M M N N N N N�-�- 0 0 0 �0 0 j t27M0N) 22+)x27 of MNON)22 NM0Ni0NiM "",-,MON) -„,,,,,, M 0N10Ni.g naN7 m N rL vMM 4g 4 of 40of N4OiTZ 4of 44OT Oi404aC 40a01a T4Aa Q Q a a Y Q d Q Q Y 0 Y Q Q Q f Y Y Q Q Y ,T4444 Y Q O f Y a Q a Q f d f r Q Q Y N VEHEm 000010 Nmc amen nm.-ON Am)N0) (000000 ERM (00(0000 (000 n 2222 ap 22Y Ymy♦uQf 0 q'Nap rpm MnN f Nip tq 2 Q mM0 U) i -000(0 n” ""e 82222 O<n0 NMYYY rz 22222 M 0 0 O 2 .n m m m Y M N.O Orap n n A m m m m m m 0 0 0 0 0 0 0 0 0 0 O O N N O 2 2 2 2 2 2 2Y 2 2 2 ..... m w m MMQQ AAA Afff Y A0Q)MAar7 M tQ+AAA A N 0 mm 0 t9MMa07 22222 M Mai MM 0)0)(0(0 M 4 h0go0 0\'0000 00000 ro00eo 00000 g0000 c0oo0 groaoao0 r Ann rnnnn nrnn rnn(0n rnnnn AnrAn A M cgmmwmm oroamm 2'6;222 vnrvom *242A 222742 Nwvna "'4nn 2; gi22222 22'.;-,22 N o nYMm Nov ti VGY�N or tiNNNN NN NNN NNNN MMQ QYm00 b0�0MhMA rMWwNNmm000HN mMMM 00220mRNNbN mmNww00mm0 00N2m Y) L2220^Q Y Y 0 5,"!!!!:i; 200t: ONN N 2 O WO :�� r.,::7-;!! O AO M m rg ;24;";11 2 M t-- -- - - " - 0000 OOONA m0222 mOAn A0nnrn uuuug,vA AwmmmA Awmm(0 ww0mm wAnn1fitiPnn PPP., rnnnn 20020d2220m 02222 02022 222200 22022 20222 00mm0 00000 m ^3O On 2 0 0 Mm 0- m-0a-m m nN 2 M '42224 0•f0N2 22422 Y m n n m 0D0GOC 0000— . GGetM ANY ' N'-- OONNN 00< OCCCO OOM nN0nN (0nAN0 0�p q ommm mrf x00Nf N'm22 mr00(02 O W 00'99 0 0 0 0 00 O Q n 0 m 2 0 0 0 O 0 0 m 00 N 044 .-Na N'' 2 200201 "si72'41 gRin11��Z RCN0R aQQGi.M,; Oi NNMQ 0m O NNNan pf e27Qr C rOYON m -E----- M O n m '4"42,2 Y 2 N 0 A m A 0 2 O 0 022 N m 2 M O O M m 2 0 z-..... 0 0 0 00 ...Jo,M m 0 a 0 00 2 2 2 2 0 A 0 0 0 0 0 re m _0 00 m Q cm C n 00000 Q'-aV., ,4 ♦♦T 4Rgr nMmOb m W i- Y�Q ON .— 0 0 0 • 2.-a� n2NY n0 . 2QNt7 O impp r r r^Nry N"y'"!T TT'^'?`? �INNr°q°vmj rq o '0 b Q J O Y Wize 00 00 4 e'- $ n N ° > Q� x`.00000 N.n-a20r0N) 009 m0" x-002 222722 NM00000 O-non i0Q2mrnm Y g Sal" E C Y '00 0 0 G C O-'" •t'7,"4' ^W 4' Y M O N iq UArp 0 II M E N N aU aU C O w `N e .fl s NNM Y 0 2 0^' �0 W NNN MMYYN 0 e��m orrnp 0 J E° f.00 am`a 0 e E `z, M 0 v oz�oO�no m E�Zom= O _4 �4;.E'61g S0= a orcavOr'govn)mom12-o°3 R x 0 0 0 0 0 0 N 0 W O h d M m h m r 12 P 2=.7, r O g P N M 0 N 3 V n2.A m t0 b0 _ ', 0 00000 0-0'0 2m S22 MIA O a82C 40222x0 A N N Y m w 0'- P22,18 N 0Y, 0 P A M 22,1:Z: m w W Y _ Z NM Q0 000000 nl�nnw m o 3 t C C 1 O --1 D ` n 0d tira3 py r " 'tc mX E¢Oocp0 am 00 0 ° eo w°2 _ ¢gE0% Wggg$oo rag,m4 r7,immn avmn:: A$222 aavm2 M,%28eta22 2 7 =uOcRIr960 drny 00000 90.:T^ ;r2NVTNMO -0720s0.ms 00bnw 0402 O '?d Nm dO 51; 1° 3°123;§ ' rr —77- 'v"T"1T T4'??r? 9T4.09r d�N_CCWmaz`g0 .M8V C oopm3Fwauataii m O0220N 2gnnN iNn010 n0anv AN20 2"g4 p'4O;-2 "4" Y0orcom ,-M« o ym♦mv w wam M v avdO."".m N^rgN G N0a ' '3 - f Q•-m N00Y Y om r tim20 ""' mb,'2 NNNNN V.V.= NN NN NNNNN N 4 721 T.- H EnAnmo aOCNr d0 m00NaN0 mrrr0 m:0 W PAIN uriPa00SAO oPP=i '41.22A N � O 'NoNo 00^2 N0wnn ooaC00a �pN mN b N0 fm ... �TMw ngn ms s.,.. O�NMY r0mbr0w 2O.-;N aY7N�yp NYA2r- M J p F N N N N N N N NNN N N �� u°6 9 y 0 B.. - .-a `+000Nd nOOMOr r00NNd^O NN�� MGri12ron mNmMN ?',,7: T0M0r 2 -- Ob .� QAQ2 oQ 2 = H 0000001 2OOr00 n 000(0(000(0 a0000NM 0000000 Mx07 x27000 am7 00707, 000x000- ui d S - .km i< E M M N 0 ®' m 0 3 V =E7�j W 0 A.'4= m y rOO pp �pp� N j G.-3.'4; �-8888' 0 W M m 2mm NN O QYm 2pM<0 0 Nr00� Y Owi N V NN 000220 O2Y O - O O O G G 0 0 N M f f Q 0 M' "%W.1, A N N N V.2222 M M M m x07 Y OOP f O Z 0- M Z 2T1',0 Q N e 0 0 2 L Q 0 , <14.( 22,-6,;;182 m U, 04 J v)S foi(Z Z Z 0 0 N m ��pp po G^000q NOuO)aDM '4000 'OMbM OMr-O 2.2001 V 00000 0(001202'1, a E 1 °4':;22 aym 002(0^ c 9 02 -"-0 .-ari ^ atimN a•4v2A 772p VN 02 repo m aq -- ar7M ^0000 'YrMN O2 Nma�m NYONQ 0N0No M m m 2 2 0 �-' ^ ip'0 2 2 N N N N 0 NNN H N N N NC • ti 7< C N W m CW m 00 S Q i J 3 Ct u=al:" N d et]«9WOsa as - n' 9 L r y 2 1 g my EE-21-1-..00.8e) o 0 O e 0 6 0 0 00 24 x5300 W 1203300; 0 0-1-00 Q S U, 0 H!H nm 110 aN cNpm emW NeNNN 8N8mANNOO .m84ON7JmMwM _ Q0.000 QNA NmMp NMOAf On MC MMTMppNCC Npp0NOQ9nNNmmEmW WM AJVm OmNm 0J IhA WfM OTppOA m,OVhM <h mNrMN m]M 7CMMM 00 ppOMMM MOm NNNN .0OJNJ 0,NNN0 0u {wNmPA4 44444 r PiPmot PP 4'9P404' WP4 a4tt.T ° 044P OOOPW PPnQ� , � , r . . r , r r r r r , , , r , r r , , r N si VEPWOn 7424fN28M2 NmWNM 8044nNt2:0 2]28` (1282W 8V880 NOOrM 4"4840 r8, RP NOOP< p 41:1Nm2 ANOmO 48'.:184 om08mOOoO mpWSP • mDmm OWWWW Wymmmmm onAA ,2gAiA nnnn naoma $2gm 222 m2 22222 mmmmA J P MPM MMp MP 7 MP M A MAMMA AAAAA CAMMM MY M7 A a PMMM MyACM AAAAA MAMA' MMP Oy AAAAA MMCMM A N 0000 000 CNA O0 0N 0M W0 00000 OOOOO 00000 GCC0 GCCGO 00000 CnCC GOODC 00000 CCC0 00000 CCC0W0f t?NMCCW OC m0 00000 CCG0 00000 CCCG lm�0 NN WmWOAW ONNNWrMNyyppA NL%o pWE� Wm4h VYW5" m0" MOMN W 2O2E2 Nm • "22g NNz,sN 'Zig P8222 221'6 - N WNmm WANN 0m 22 22222 2LNN2 Ei222 22%22 2 2m222 WWWNW mFWWWWihWN NNWAW WWW @ Wm M W W W28 := WMn .9-g2 OOO OO AOa HrOM W h � NNO 4 NOW P P A m M 0 OON�NmNONmi '4114'8 <WW OmW 8%4;8 4'P;O F.,("8'682 OJ OI QO�JJ G W0000 Wilt OOmOJpp mmWA kMWWO m^WWn gWWW m$OWn ONnnn nmmmm kR5,52 00011 m5555 0500. 5555k WmO WO 0OMrNQNmNP 8814$ OPrm 0,-z I8 0 MMMT1 W212? OOV OMNC n4,�02 OOMNO 7,:224-M NWW + NNalti 228(0a::22!;-,MW WN OOOOO OOGC .-6666CCC 00.-e-0 OOtD fO v) vJ to to rAP lV NCV tOv to f•)t7 el fh CI W4=C N.M-O 2222A 282«.4 OMhrm4' 0C0iE 0imW.O1 Ep 4288 008 2 Z 2'.2 8 OJMNtO 8(.6r ::::: ::::: ::!:: ::::: ::::: 227M ,,4OOrmmON40WNNOo ::::: TPT4> f0Dm 1 TTmm mOJTOO OA600.< eWmrWmm NNm<m MOOmmN OmWMO WNnr 0 OmmmO 4'NOW A o q JGGm o( 4<m M4 iM OnaW m2M4P pONom MOW4Cm 23 Wm0PM mmmWSNOO r" NpWOr WNMn mporN 1OJMMMMpfAMMWNNNNN NNNNN NNMMM MMMmMMMMMM MEJMM a =Q Of n mNf p iAA mA h Nt+j OJ(i Nf Y i 4 O M 2 WrD m N• a4 O�< A NNN N .148;8 2 m W.z0 < rnN 2 N O' Qm Mf N m NC I N O MGGNn n64b4 m444mN Np46 nONN ro " "2" "88 e"4 NMN WWO A;MM c-rWWM c°,3§Mi Vj CN WM1W NA1� O.T.MMfMO mm n maa��a 8'424.8 OOO WVVrAW A2:282 .JAmm 2 2OAmmN N Q M mfp 8mmffppMN 2 O A�N MNmomr[NtifQm OOMYMm�M 0 = OrHAOWMO°nNgN WrO< pNE 1�,r7TTm TT... �ron onm0,- NNa NNm 4QeAm NMM r , , , r , 77777 7N hThMM hh7Mf ?fhn M, A a ?,-45gON AOD26-4 ONm42 0NN8N 82272 2272 OOmS22:?S22:?.?! m84'.8g"?0g"4 274428 MA0OWN0 hrmNNNrYfW Ot=MO°O mWNW 00p *,69 ,7 OW g„igal WWAg 1:18W NNWWW WNOM 2MM82 NmAMM MMWM MMeP QVfPPQ YPPPQ �ODPtPA aPmmvbANYN 2NmAn N '.O• Y• QQJOMWNrmWWAr^WPranmO NPP NWM OnOf 7<WNh We O O O O O MrmNm W W MAg W m W W m :P46-82 NNWM m rN Nm rP 7.24Vg3 r WW Mm WA r &18:140 mNOm n D fiWfV nWmWC NCmNVO4 'NNOC OoOV N DON MAmON G0008 mNmVO iNA> iG . 00.0. NWOW N mmMN W.MD ONM(Mp• (NiNmN NNNWW mWWW WOOMN NMMMy WWWOO WOWWW 40Nrr NNAAT MONOry W;;I:Mm C2840 OMrON VNNPM t,8MWfl MOOON 82�8O O8P.-NP N22P',8 4y80W O WWOMM OCOOO OOOOWAW000ON000OONOOOOWOAWppO+mW Wtipfg E t0rN U W P m W W MNP M O A W m< 4'0<M rA W N m N N O rA P m M W Q 4 M O N M m pp r A m P m h r m PW m W P h JA N W W W m 0 N C N r m a M O W O m m M n P N fA m n m m m PNM P N MMP MM N mrA W m A A m N W A ED r A r A O fD m h W M m P m@rA(N P M M 1,1-V4"4 4 4 V 4 4 44822 N m r A m m V J f8A f ry 88 88888 h h h N A g N Y J N r t N N r(Y J iA N iA 4 0 0 '‘'; !4? 4 M M N l C�A M f H N N N N 208282 2g A V, Mg/P.,2 NOtf0 Vc'JiNM �mmM1 A rAS2$V WNQ?V AM ImS NMW ONNmNr N40MO W hmmNWNWWNfAhmOWmlmQNMO mNPNppWcGt,4 O WWOM 00MAr MMMMM AMMR mF,.74 P<V0pOm gg2fpf0 12222 ommom m n n A n n ti N 8 E _ 0 U Q • 0 W OTT Prn� ��Opp W W W W �W C NC Y�N �p m MOW d d m d W W REM d m m N N N n m yN N W N rn M(') 04422 nMO� .O V,2R SPC),22 s0O2i 2Q Q mA V W rn�-p ENaln- ^m p�W n Np 2 20mn NOW W N WOE. nnpn C7mm00 .. M 2 fON�O2 N, 040 E2AVA 28',E2d RA7:2 tD{eplpp�pNpO g YY (7d eM m W n .Orr�- m0,W N OO W�0 V m,210,2 W O�ON �2�0N 2ON W A T n, C Mt7(N7 tN')m CD MtN7 HRH tyMMO NCpO'�QM dQ�W 21:-. 22TCp � � �ypW��� n mW �Q�Qpp����pp{pN(mpp�m W W t0{p mtp0� W n n nn W m W Wnmm pp�� J N N N N N N N N N N N N N N N N N N N N N N N E N N N E N N N N N N N N N N N N N N ry N N N N N N N N N N N N N N N N N N N N N N m 0040 4e44,1 4'44"Z,'.1 mmmmm e mmmm °40F4 mmmmm mmdrnm ,1,15:0°,5 ae mmm 0000'4' '. t m4'4mm Q 7777 77777 77777 77777 t° 2222 ' 202M coMmn7 2222Z' 22 2Z' 42f2,1!4 MntN A ii 2 2 VnAn 2 2:=R748 n2:=R748 C 238;22 38m2 2In44� 222 2:2222 :2 2 2 MMNMNNMN22 222wi tDM aONni '3 -R828 8p22R"2 O2M;m mWW mnM2 WWrn-N "'2NleW gEEEtzi 2AAN NaM M Mill RAM mm�mm � 2 0422i '0404NW22012 22222 222R2 cWfmg , cir4i�M M0oFo00 000 02020 00000 22222 22200 20000 00000 O20M2 22222 .7222 WM02V, -2222 ;7,2224 eMVNA 21;2g2 222;2 VWNOd 8:221 326-2,1 O`�Mm2a mm2 2N22fihN22° 12MNp2 Wa'2N 2223 Vi7N" 222 1VP;2 2r22 222 ::2 2422 OU .W0000000 000002222. 2.2W222.22 mnn22W211222 g2or2222222222M22222WNNNN 22222 22222 22222 220422 22222 04222 222 0.2 22 WWWWW 2 222 2 2222 042222 W C WORN44 NRN Zmgn;. ,2 t 2274122 22 22 222 vQMwN r-:'4°42,°2r-:'4°42,°r-:'4°r-:'4°42,°2 tNNN0F8122 2 7M22,72'2 M2 RO .2 N O1z:2MV< 2mW)mWZ;tmWniNnmW mM WVA2 2RM3O 222V3 VWOOia 001002 nN272 22422 222242R2g2 N2r0 20MV2 nW nO N ""I"2"' 2222 m80 $ 2222 wNmNN 22 2 22 m= NNNmn mrmmWNHEIR 0454 WmWW04n2 mm mmmmm n.024222iQm00 0Y MNMNN NWNN0 000 00 2V4-22 2254',2 2R222 28024 0) ,2004 W 044 Wvi4W2 CCOCO 00006 00 0000 nth NtG� f�i�{h air Oi tGn CtV tC W MD W�,2p W�N2 W W mNMQO M W W N W 4.22'.22 WO04W M04 2dNWN 2Mc�W d W 22, 2 OWrOa O'ON.d.2 2°2838 NNONm NmWAO 2O.2A2 N O,2MA6.43gaN 2t4;;,gCC.7;&6,4,2 44MNM0OT,2p:OWM2mVNyyDO M cn]MM ,200MMM.. 22222 22222 M70W Mp'A[ (V P MQ M2227 72222 2MMMM M2 02 NN m�fNppV 2=22A N.17:=2:2 2AWnNO .2222 o224 2 P.2 M^N 282l72 22222 22222,200420WnrnN2 tp W W N V W N N Qm772 0020 :N " 0L222 ;i2"7"� 222440004 2WW0N Om4 2^20 y°M2222W2004W .TT WW/M Vt2Wm m2MMMOM.° 0000.- O 4 A 0 2 r :7'4824! 2g;2,72 N mO,2.1�0{2 m 7-N�M ,72222 2 N 0 NMWdd 2322'4 ONWW 22,n:2 WWm 32.T2 W Ern 04mDPngO0,yCJO 0gop04W0,2 pM N0,mN2ed-md 2Oe 5] U ARA 2222 2 2 2 22 2222* 04M2M2 hMM2W22� MM0W MMMyVVyymdMVm�2M2 m2222M 0 a CC �p _eMm20 224 8°? 2222 4404)400 r 2170,20 2282Z? RR V Tam) r.:22F4 22220 ,t2r222 O2R2 2A22,1N.0,MO ,2 Q Q W,,W m GN.-1� a W th 1` NA r W m NDN W.- 0000 W tOC W NtO r-LL'i mIV 0O)d Y)[WD002 ,2200tNa 012 MOND M- V n0t272 O MOON. WW O•-Me ND 0 ,NNmmVOW.- ;;44 dVded OYnC 44'00,2 22227 W220p .22222 NWWW X0WW. W D O W N 22222 mOyOp 22222 f a • W 2:1",°R N,WW m m 0 W m im MW e 22422 2emm 2 m W N W 22Z:22 OQ.Wm nmWON OdW W M DN�-NC mNW NN mNWNNW 2NNN 12,22f:.' m m 2 i� m 2.W Q m W nd O 4m m =m 22 282 202004ppN20pm222> 222m m222 22222 N2O N eWWW 42220 NQN. 2 mmm2m 2Wm2W N2A0)Nm OW2825 324Ve W MMc ? 20C)mT?c0th MM222 N NNNNN NNNNN N Q. 1�tiO.N 224,20 OD[0 00 2 2 2222:2 02 000 T-.2222 aWOoi)n 48222 822 �047 n0104m7 N[2D WU 0O 0Q 0V1tD^ m�Oy.)N2Oi000,- 4Y)'0N0N7010440N4 m0d.482NO0W,20 00 0422Nm0W0 ,2 j7, NONa2222 Nm<oo cmNWm $82§22QWmm tnmr28 m222m 200422 22m22 mmmmm 22$00 2S228 N 8 yc2022d 2;z222 22222 G~ N22N 2 2 2 44- R2 2 mnA2M 22322 2m2M 2,2ON02 ",..,!,8 728OW 0WmRN 24 0,2 245 .0Wm 24i22Nd222 ;'22nM 0222;1 22220 2N20 27;222 2222. 0474ia0 OWVOrj .gg0� O Dn2M 222245 o0408$ 0222 2 0momt� mAmm2 27 222 A2222 mnrW 2m222 m2222 22222 m 2222 OA 1Wm O tOOW SAA2R 212:=2N 22224 In2022 mtOtih 4:ONON 2 F. MNN0) 010 d 00) M V0,V 00 RRA' 0))1s 0 00 400,0 0,101010 t0 NY)0 t0D On nm m 0)0) W 00)Q VQ 04'0 0tG 0)(V 00Dn EE0) t7c R'A'2 0[717447 1')1')!')17 t7 Mt7 Mt7 t7 M2Mt7� 040417 ty Cl 0400,21 cN7 Mai2M MMMNN NNNNN N 2' p ht. 4!2V-.22d-NM WnWmdW 22.122 O2002 VM Omm tiW22W 22.7;44 Od-NN 02222 22200 O200r 02220 r NNt N2N0M M2222 MMCMQ22222 27222 MMMyM 22222 22222 022 22222 02422 02222 W 2 CCY42."2222 .0222 Nm.2 2 N 22228 t22p 2::V�n 222:92 1,22:22 a2:2M 0 22`488 2Vpm ..1.202 25,2 pNpM d0," gVdgN2g" g"i 2M0W '0 0annWWnnnWWm2OWWmW0mmm 23224,8000 7OOOO200 - • e 00 N Oo N m U 0 C E a U ^ • U) yyp� ss{{ �p pp 2i �p e� o pp T �p p p ?g222 ° N.7-N OMi 4,g,0 M%N V 2 22 7 Nt$QmN NO0 v- N OYf ow N ymy mNm{m{pp m..AO mt7 rym NN rNhmm Et7yON^(p AO']tW�pp gyma{ Ol Qd O1 CCryry yy 20728 8V.EME' m TN.O 28 -22 t0�m�{p OQAON dfDm A Ac02NW d W S NC252tO BrMfMO� C2')�[2]m0 MtOO pm Qp�eM� [VOp Vm p�pM om 8-2".-{p m�mp pppW pW� ppMp fmpO mrp-M mm�f7m o�Mmm MNmO N dtp O NQmd mQm d g 0p0p00 Eggg - 00000 eeAAa mm c0')nQ�CO,�R t+�MMMCO] f�1l�Mf+fm seR,9_f' th Pl th Nl th f.)t�+f th t'M PSM C'fM� mMC1 fh t7 MC?tmnm OMMmtom MMMMM m ofT of ai t2442 0'4'4°4 ai ofofofofof ofmOoft Otofofof t400t oftTvtt ofmofofof mofoftof Taof2oft ofmttm ofofofmof at Q % % 7 77777 77777 77777 77777 77777 77777 77777 77777 77777 77777 77777 77777 7 ° 2":' ErMN S8'Sg7.1N2MS'S SS88282 '2;:EN .02 RP'8NmNTWR'R MNmmmN 82822 oET_ 872 Odd 22 W2nE 0'E pe -A-R- §--- '222N % MMM7gMMM� 22222 rM M mM mW Wo TTMO EE"' " ANNgMVQ7 2A 202 222E A22222X222 22222 e22Ee2222222822 gigA MMNNN MNM0 VVM2 M N 0000 00000 00000 02022 00000 00000 20020 22202 000220 00000 00202 02202 00000 0 Q C� MMEN 2E222 R8TWN 2E2r2n 2n022E8aRGE X V 22 2AN8iES SERGE Qmgm 2mA. 2a E2ag8 t.2iCl2EdN8 0QAhpOM1Mt�0M 2 bmgggg M MOhh gmO2A Qgm22NgyAgr<022 71,MO^Q00WN0 Wpsgg W NEhNN 223E Y02 NNNNNYNY.. MTTW 22E 22222 22222 22222 2N2E2 2222222222 2222E22E 22222 22228 NWNyyp 22EyyN�VMy1 7 TWC"M N8Nm2 2E222 NggNO TTmQA 2m7.82 TNO.m OmM-2W r[22! Nm�mMM EgESI m MdWAIO0"" N "g " 8 g•T5 NN NNM0NMgg 7; O N0 ETT ASSET0pp00IgIQg gpTTdOTTTTETTTTTTTETTTTAWEm20228 8O8O8 SERf2CMMW.� OS MnnA nAArn 2h An Van MLR nnn rn rnnnA nnAr n T RTR TE TTR �2R:OIETT 22WWW %8822 EEmTR AOi2Tmm ETRTT OfAMTT R 12�El o1TT RTTTR TTTRT T 202h N m2%m ONtfIM �p MICANM RRW 0tA 0U5200 NhmanN %%%�tI% %inn NNN02 mHNiWWOm IA J:o ,�E d,.-�000 N0NON Q2r02 f22E2% 02082 CMDAONO 81'g2,7> 0mmh. 404t..:6 W G2).00 0000 . 0,700 W 0 28S2V O 0 -0600i d CV,N m A 0 2,2 N N M 0 t"1 M m d 2 T .f fV tC th 0 C)ei m fh A d M ni<V G ei N A d N d 2 C 0 0 7 0i A 2 G Oi 0 0 2 0 2 vi >W:4%0 ::::: "^ MMMoCf0 2N 2t , ::::: Nm;VOP7Myy7 (3pyR < i; 8Nhh8 N <0V 'a4 N ::'::: pN22 M TNTO OMm.E m -M N m m%.mmO E7;22 2 m N QdS �gs, 00$pAAWn^ 7m2 ::::: :::::: ::::: 20000 ::::::: U mmiMMpNNNN NNNNn ::::::: :::°:: 0NNNNONpppp_ &ESE MEmmE VEEM2m (2012°.°A4 272E2 O2rW,zOQ ON7A 6CMMui 2NtN0 2N W^BCMmg01000 PA007.NNNNM2M<02 ..,zrO 02mm 228%. 202n2 nAh hhrnA A^rAA T0m 0mm2% 22222 22272 mmmm, m 20 a (\ 822S4 g82 22 ,m0 ET m N 2,28227, ENEONMM 22228 N0mW,7 7E0NT 82;28 2;2N 2222F2 0n O0M N 0 ONg..., � 226606 1,:0606 20 2a0 n NNO.O 0000EO202 SGm2 ,707W M24,,N v700 mIn '1,q, 7? 77m rti—IF 777 77777 77777 77777 7 ' ' 'ym2E.7E g'.2222 SIOIRppp��pnrpr EWg82R 720202, 52222 E877E^ 200,202 Q)r%NN NMOON mWN07 R22NN NOln2�EW N 200 OpN QNOO OTWmm mai � vigss gfOEEpgf"'E Mr;igt ��ttt t7;-4gol 22222g'Mg' olrnmrnm mm0im m TET T R aS tE R T T m m 2 2 2.2E8 2 2 0 0 E %m m m m 2 0 2 0 2 22%22 0 W m 2 2 %m m m m 2 2%2 2 222g2 m m m NICgt M:= Efn220 22R8nmr0017+� NINON 1;:EginN r^E`T-8 WNMN0522 .7.2rybn tQp mn NNn WOVNW E2EE; Q.9.88CMD h 222E MMMmm R8E2 2(0 `°22 222 222 m'�$ 2 2220E 2E22E3 22gEE %mmmm 22222 22222 • 2220 22022 22222 $2Wa�im 222,2$ 22202 mEE$W %WW2 22222 m !° 7,Mmo 82222 *oAgA gE E'80 * mg227 v1.;rmm 2eovs R P-ERIS 22,28888 aQ28,t nT$M2.8 • 22202202EE%o2W2WW2np2NWEE2E%T0m E2Mm• NNNN NNNNN NNNNN NVNNN NNNNN NNNN . NNNN NNNNN NNN22 NNNNN MEM%OEM M M M M QQ-0° R22')O .m;ES 0128222 AmV28 ;4222... 0000>,� 2E8E2 22X2]7,2 MNOi2� WNMNV OC28t34R222O 0W2M 88222 28g8 Tmrno^ go01 mEM rnrnrngmalolMTrn MMrnmB 888mrn 2222 88MMrn 28872 728518 M88m mmMmmE dm R=gNN10 2A0:=2 0O�7�22N.-M 2EE row Oe-N. P�% OO0NmE g2,28A7--.222:2 722T:2 2. N22 O2222.-.- W ESR, 2�hOr m82mMO =466 ,,0Q2Ecop022roM 22402222OTn <66A0°_ NmOi,oisr=^28 E2TTT 8O82n mNNN NMMd7 2Q20 0mOr2 mmOmR ETOO2 82M22 O722 2822 " 0 NVVVNNNVNVV8NNNNNVVVNNNVNV.V. MV.MMMV.M. Mm^ r N N d) 0 0 C o U � III 411 0 yy m 0 Ma m2.80P aomA6-i 2.80 GMD04 �2AaN)^ m22WONi GM)r4NW 22 m € 72,10`2 4-,2222 0S8t62 8prw ,2) A2... 22,';0. ..II a J 0 0)0)0) 0)0C?MM M0)0)M(h 0)0,0)0)0) 0)10)1)0) 0)0)0)0)0) 0)0)0) m 7777 77777 77777 77777 77777 77777 777 r77*7 77777 77777 77777 77777 77777 7,z7 N 28, �e '2°0)02 m �^ h�nO V Y)O rm2� N2tW0 N 2m(Opi��{p+n� 002 La N M p�0.f�O0��p1 n NO�0)�pp�rpp NN rNrpp�p g73 {0p t�0p aG�pppp m 884a 4EG - 3 .2NN.t21 0.20U)Y1,12) [2)...20 ..ONgh ..222 .00 n0 N .... ..... ..... ..... ..... MMMMM "MM Oen 0 O O^0 0 0 0 0 0 0 0 0 0 0 0 0 0 0^0 ,'. ,'2 ,9,9 O00 O p o N T 8107, 2pp2.7 44472 4472 2AN80 48 46-2 88882 AzoaC7m0 22N�W pp20M2 OA8I2 241�m0 ,Tyy24A Nie wMNNNNNN.- 0000 Ooomm mmomm omm VENpRHEA 72NNmm R2HR ME EN 222 CmgAWO' (0028,7M m:204'7 2',e&82 � hlmNOm42220 �T..-T1,T..-T1,092 2 6-24 1N0 02 " .NNZ §2Nn222 NE ';: 202 Z 0028 028O2 Oppoo 22p22 22282 pppop §12 22222 22222 22.22 22222 2222 .22 2 _2.N m :!,1-,2612 22Am0 M0222 f:222 ,7 2 2 2 0)M 4 2 0 2 2 71'28 0WN'7 VNh+^ WNhCW WWSCM WON�2 )W ON 000 Z QQ4Q<Q 4 2222222 9 9 2 4 9 9 9 720yy 488::4 2e,72A N2240 emm4NtE 82;22 rp4 O 0QQQQQQW ME.-WN §Wei 2tt`pOp gENom EEM °pim7§Fvmi Ffl. ,- 022(p , _'.944994 00" OO W o0) 777§2 2GD�mN EV4F-43 n n n 2 2210 J `o m "•-.2 §:22 h28:28 8O04A 747-00 F4.A40) ^,220 Nq2 QN2;'2 R;8AONpp0 .MY,AN yy2 .0 8422:1" 2m 022. mo00o0040 N.NNM MM777 7..N§ mN 7NN NNNNr NNNN NNNNN NNNNN .KIyQ8( 78 J 1- 323333 Q wwwwwwo NfLLf# t "g 7Oo0 28 E,0A NN828 O0222 77.O28 N82F,HM mOm T4{T2LTm y 9p 4242 0ONcN . NVrO pp�hQMor 42gU ',;;;;1;1 NNR1.2.2NN .ANN NNNN .2..',:i NGyN `f ` d0 J LI 1 Q0 gv.o §m.24P24'8 4.,10).1 22NNA 084401 2r2A 12888888 D 2 OOnM ....82242e-000MWN2oV000OW.N.W. 220 : WW W0w0, Mv0< ' °t5,%2222 222%8 WpBaa mw088 88811 A8828 88 Q m U C y m d . YU a \ m g .22.-8 22 20) 12)0,0 .1022V 400002;22 22480 402 NE.2O888222) `% GI I \ O w .80) ,,,,„„I',O2ff�A2 oMoO 2 OV+o *A22'' 222" "'°N2 40200'., 7,'01'0) TQA $l�WWWWW2 �� t N L • 7.- -NN NNN 2 /O i U ` N m a a o m y yy t0pp �y HHrrqq NN �j o >,c o$ m j eat,§ Fm00p 7NNOM MC400 20400 42420 200 gREt2CCC - c 0 cv�Ug h 0(00]2 8hggm.- hON m ICI1Nr O�NM t< 22222.2 m U mm` g `gi-ai8)m P2P-12 a2m 8 limo$ o. w .._ Oil 8201022 .8200 3888 Oo p T3ttt ry Yj o �.�' O c m 0 2220 2220§ NmmmN 0§222 N2mmm 000§8; $mm p ¢¢Q2<¢a¢¢ O :1 o ,oU o Z o 11 w — 4, c T ,� q) ciT. w ; E z m 0 ! . ... .822 N.-WWW or.m 20§f0 2200§ .ON 2 y000000. G ' 2 X7.-20 0.... 27222 ...NN ...N. a Op). 4gA0 % 2222 727 P..P. . Igor-7 88881 08002 77nON NNN 0 W00,.-W. 2220 222GD 2222 m 0802 22822 720 N 1--I'""0' y. m�22 �N�2m Nm� m���m ��mmm 2002§ mem . 0c.222� ' o ooa o F. �y ((pp p 22"-A y 0p p��00 2 8 . Q t 2 NN." O 4422 <.020 0D27AN ICOM- 0 O. 000 U �r0020r0S0 E .nm�N+10tn� A222% CCO 0 MMNM0) 0)2222mmm 27177 4:-..—iMI) g G 000222(.) N Mm". C)MC•1mm 8mm C)0) M M O a M W o 2 N N Mli 0 ___ w p a m j G) 2° (0004 0A4N0 N7 NN00)) 24.1-7.82 0N4A)0) 400(2)4)0 0002) p 2 0 10. Q .... mmmmm 2Nmmm22 ..... ..mm. ....m $tea . D_ 0 1 0 V U 8 aOWV. OVonOw .00l")o,2n1Nc nan,M .2-NM..0 wN.:vrn 1,6..e1 1 2722 F.,00 O 00- NNN177 t7VMON 2.2020120 2Nn O I- g Lc N R csi It 4 tg m o v II U T. v 6 0 i 45 GO a J cr W CT N 0 O O ai a = O N ^p, W ,� W WU' uoj � _ CL m a A S O ¢ n WI O Q c Cu ' 2 W � o) co! F- Z F- i ~ Z 1. c U o tO Cl_ J O J co 0 W O 0 W 0 0 >0 a O Q a) 4 O J > J E • ❑ N U) E y Q m CO Q N W U T ° U, . o U a o C7 a' Cl) _0LL O _0 w 0 N S Q O -O O -p -Q U o O o O li p N a) V) N a, COO O O aD > > V l`') O O i<- co N N N N O O O O O co -Oo a a O a7 a) a) U3 1 co - 7 Na N N UNV x E - i co N x wa x = a) a) x !s- '� U 0 2 0 W O 0 2 0 LU p Cm O piIWI.. d != OZ O o a E E ❑ ~ Lu O O o Znco o a u) Q X a.) o (a 2 _ O o } O) cc Na) m (0 ^ _1 o C C aE) a . a CO U i4 ❑ o } Q o LO O a 7 o >- • 2 U _I V m N U) O Q, .N. N › ai Q) •E E E _ 7 Q' N lq N O 3 CO 'al' a1 (n Q .a > a) y O O ��..L(( O Oa a3 E N O ,} 0 m DD ' C ,5 E C )5 E M Y o. a Ol C co (/J O .2 (n 3 Cl) mow/ W ' a) 0 C (- N U > d N U, > LL n° N O .Ov N C• N u) U co ...... N U N N £ o o p ai x x p a) x 0 2 > H Q co I j o N o Cu _O O W W Co a N O W LU Cl) a > CO a r V +' S c M 0 » N 13 k3 o w a y W = a • LL L.T. E w , n@ 6 E o E L V ''., N Cu N a aa, Q 0 W U - O Y o Z u) Y Cucn O _ p co CO Q �-. m N a O u) n 9 O) a a 9 4 -.. 0 E N )f) o N to O IT. Z CO O w N. CO Co o J N N C CO O O F- O o O o N a) cn M J Ln m of m 1 a) E �-0 E C r z > 0 Co O N 0 N a) CO E a Cu E a H q H u? 0 — l':.) o Z 1 .0 > > w . e > o Y o w N 2 C N N O -711 C U) Q Z (n U F- ❑ C7U F° ❑ 0 Q D U) JO ❑ a U Z ? J W Z < O a a O CC Uw co I 0 LU H ,..-7- 0 0) LU CC CO w p Cn m 0 W o N a o 0 U7 Et > a X F rn a _ C7 D a to Z = w 0il U U o 2 2 v u? o !0 J U Z z w a a O w a' r co o :.o , Ei i C/) aII' a, Co U) CO F 0 a ,- co CO a) U) � J O c m W z E o >, w ca w in U w c° E m z W o C a) a w Z N CO nj w Y a` > .. 'Z O W Q CO C . 0) E N 0 N r a c ru o ai d rn E Co E E c 6 adi m2 ti To 0 > F m a E OQ - a) z. -oo a v ai U) OCo CEa) G ` N a O mER TO = aC Z F- i > T O COZ FT OE o a) a) — F H rF r ..n N- N 2 >) E E a) mo Z' .mY c 6 o Y acoO 1--- C.) a W o O o a) CU U U ao ai _ 3 Cu . CJam a s a LL v) a U 0 Co i > n 5 2 0 oo ❑ 0 0 0 _ s • O _C N N m a) O) N 3 (a ` E w w O' W Q a) - O .\N.. - 0 .\N.- a a I s-N E E a' S O O a' 1 • O O a) W W 0 W O U H H (.7 C O J H W o m 2 a a a w O. p 0 a a w ¢ O U U o O H u) C7 al 1 W !- Z FO- N 1- m Z o _C a¢0 ❑ W s- Z W CD N 0 ❑ w I N c a) __ I' I _.� (7) c, a .. .. E a 2 >` 2 V) >. O` Q '.. E a -in a o _o a N >. 2 N O L p o = > > > > > V) N N in . O Oati ma) N • N N0 N L 2 L 2 2 L 2 2I O Z^ a) Z' m Z' a) Z, ,n Z• a)�' o E ' 2 ur a " 2 )n ,7 w u ul a) W a H CxNo C x C ( -. c x c u — c a) a) x0 a m x LUoE E L o ❑ g ❑ o w o ❑ ❑ 0F OpU O O O O N J ' U C a) 7.C ma 'C ❑ z U) _ �_ �_ a 13 w O O O O a) a s f7 .- O O O ) (n ¢ X 0 O O m m > = O) a' L O E 2 a) °.1.. C o a � Q _ I) U U) E u) o - - a a 70 n a 00 a a' . o v 6 > o o > i H ¢ CJ 0 (O 9 O Q J ›- < H V N O M H co NI ,_ O N L a) m a ,> E w `n a) a) a) co J O N u) CL E E E a N N ca C) a v O fl. Q O d ) C I' O Z, a) O Z+ a) Q a it a) O O E _ C O § ''- C ), E C co - (n O U) O O LI O CO y w it a) o) m E, a N N > a iii u) > oa in w > o a) E 2 E E 5- a) w h v N a )n i a) awi Q 0) m <a U .- H p a) x x 0 > p 'a) x x ? > p a`ni X x F V ❑ w w �) a. a o w w v) a V 0 w w cn a N U = 16) 7 O '_O 'gyp 'w6 N a) InLi) IT o 7ci _7 .7 Q E G ch V i N = 0 LL W LL = Q li N V a °' a a o w ii LU o o v o Z co Y - o o o0 ¢ a) a 7 w _ o _ ooINdO 2 co )JVI coQ a a a 17, J 4 N o o N ) OW \ u � O in o 0) OU Udr z E O a .- Oo O O O o a 'm E 0 0 m oa u2 ad a ) aav mm Ev 5 .. la 0 CO Li 1 u)I to ix I¢ o inc o o .E oTu g TD 4 m toa c c c c E a O a) O - O NCD N C N OOa (6 C N N S �Oa a3 N �n O U > H O UN 5 C7 g H O C7 U 2 5 H 0 0 03 I 3 E w a) a) a H > zce 2 _ w Cr Z o N w - Y .- W '1 a) o U ' U Cl) m ai w [) o N2 O >- > 2 -0 o m ' =O C7 2 v 1-- _ rn a CC a ❑ O co 5 Z W < O W W Z Z o O o Z 2 g o� cooo Q Q o 0 O o o O -1 u) L6o a s o w w Lu ET o o F, U a .- a, 6 rt C/) CO m f- u) CO .- La ro U) T w a _ aw (Li w W o <a O H a o _c E , 0 E m z LuW Y o H v W Il. W N 'c0 y 0 Nz uJ oOaQ a m5 ? ai N a) ''? CL s OoV aa E oa -6 E p a) 'O E O m ' vn a m aE a N aE a'' Ho u ) E N c m >n U L RI Z HT u) _ > >,• o Z H' w > > >, O Z HT a) O O >, O c O > O > L 'O a -_O Y N H u) '6 O .. Y H 'O Z' O Y > H d 'p _ O. -.. m u' N L) a w C) H .2 O O a1 L 3 a) 7 3 a) 'a L N 7 O a) L a) -C) a >- (n 0 2 C7 LL () a > cn 0 2 0 IL () a j- co 0 2 0 i • U M L N 0 0 l° E N C N C W Q L a) O Q 07 aL C 65 0co a al O r It] J _ p '..N O o f o "j .o O E @ U 2 co a a) U 2 a) C C.) L o a N U N N n X X X X o'N E cn 0 D -- U) U) U) U) a) 0 0 re J J J J .) u a) Q Q Q Q U) N n C7 0 0C a N `. j p -c-._-, a) a O O O O EO U c L CD O u `. �. 7 U 0 H p N O r--. _ CO O O O O Cu o c 0 O IN I O a082 I a) 6. u E@ o F E L U o o N E O Z N Cu D U) 0 Et '3 W O r la) ' LL r' cu W Q x a' L a O E c m W O a) (i 2_, U nm (1) E o -o H = E 2 a) T) E C U) a N N LN a = > E "O dC E = E En a J N WN o d m .a- C) Q)- d a ` . .t �' m N o E — CI 0 x O a m O a o_ U) W E Ia) Em Cl)= a rn -a' . . Is fa V) C = F. i°7 u) C) coN n 'o E 3 o to g a F. 0 E 0, � .rn a 0 o g'). E .5a >- a • d . t N N < 0 O a — Cu �' cc3 5 d" a O' CO O I W m Lid } Z L Y ce Q a) NO o N O co 0 4 co c5 2 dZ 3 ELL -a a) Q co a E 16 - a u) d 0 a) :o g N t Z > W 13 (2 15 Cl) U) X Q ° ~ 0 w Oj U N CD u E �� Cu w .c N a m h a. O E Cl) ~� - M H O U O W LI o O C Q• Z Y F- p co S) o x cr .n O JO W a`' w W � LU In W O no d 3 ELL o o c Z U) Q 0 m l -- O- o 0, CS- E Q 0 C7 Q 2 Y ~ . rn Q 0 W a m a v a LU Z Oa) a' co 0 ` oo E a cr m a N Oav> o)� U � o Cl)0 x 0 U- o (I) Z a) - I) Ja) F Z o a E LU co Wp ca Y o_ m 2 a) m H K O Z U E U W a) N E m Z W o L a; �- u) 0 o- in co O W Y , ~ ›- E N Z L W ¢ N 2 a N a) u ce a N N.. < 'a a a o No Cl) uo EE CD O 1 C o aa0 U N E• a) C _. 0 .YL, C N- U) O CDU a) U R W 0 0 D O D O U) • • V 0 0 OfCOa Q N N LI'. CO a r Z Z O 0_ i CT O O H ...,12 O ..-• N R N rn H F- W N N Co ,O N P. 73 E m 1 ON NJ a Zo F C co O a a1 C a Z ' C Et E W O J 1 w as 3 E - z z N a 0. E v 0 Q - Z o o y • > N C co a) 2 J vs O a N $ N a) N m .y a) N (n d U i ice ° U l6 .. Q W C -o rn 2 Y s U� ��0yy W MS co 4) a) _ U LL 0_to N F� ~ O C a' < coN Ip 0 Y > �O .O E. U _ f a z R. U O - U Oi N U c- 0) 0 t- C U `m EE SI ./�� N 8 -2 Ca a 15 h G C VN 3 0 2 I- 'O w CC 2 Q W U z coY a 0 w a o I 0 J 0 E a z m J N U7 N Cf- co N ^ N a a z a z > a) 0 a) o) -•,. L t r C cr) J N N O F = m C e ~ DO 0_ O lL F- O 2 Z Q VI Z C 0 O m aN j ^ - o) LLI O a o N IO o o 0 W z o_ z Z `-' I2 C7 o E c T o z w m E m m zo rn 0 0 o m c Co- co t y E0 J M 0 N CO 01 O W R C • mZ F- 2 o U a) J Lo W o N m d W Y W Q M a) N z 0 a j o N N d rn c N T J 76' aOaT ° O N o Ya E o dW = N3 3 ) ` u ▪ m u) c a aUg E o• E > o a W a' a d a I a E d d ,0 a W O D E y m c o w 0 N N F- H O O D co O 00 F- 2 S Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Thursday, February 19, 2015 9:01 PM To: AK, OPS GC2 OSM;AK, OPS GC2 Field O&M TL;AK, OPS GC2 Wellpad Lead;AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan;AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead;AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad LV;Wallace, Chris D (DOA); Burton, Kaity; Regg,James B (DOA) Cc: AK, D&C Well Integrity Coordinator;AK, D&C DHD Well Integrity Engineer;AK, D&C Projects Well Integrity Engineer; Sayers, Jessica; Pettus, Whitney Subject: NOT OPERABLE: Producer L-01A (PTD#2141530) Anomalous OA pressure trends Attachments: image001 jpg All, Producer L-01 (PTD#2141530) recently underwent a rig wellwork program with an Ivishak sidetrack.The outer annulus had been previously identified as having an external gas source causing the pressure to ride 340-400 psi, however passes MIT-OA's,th most recent one performed to 2,000 psi on November 10, 2014. During the course of the workover process,the outer annulus pressure has risen to a range of 900-1000 psi, with gas samples still indicating the pressure is coming from an external source (98-99%methane).The well has been reclassified as Not Operable until additional diagnostics can be performed to determine well integrity. Plan Forward while Not Operable: 1. DHD: Monitor OA, determine stabilization pressure 2. DHD: MIT-OA, LLR as needed 3. WIE: additional diagnostics as needed Once these diagnostics have been performed, the well will be brought online Under Evaluation to determine what mitigation is necessary for continued well operation.The outer annulus pressure will most likely exceed MOASP (1,000 psi) while determining the stabilization value. Should this value approach 2,000 psi, the OA will be bled off, and a new approach developed. Please call with any questions. Thank you, Laurie Climer (Alternate: Kevin Parks) BP Alaska-Well Integrity Coordinator GA I Glob Wells V r�V Drganimmvon WIC Office: 907.659.5102 WIC Email: AKDCWellIntegrityCoordinator@BP.com 1 • • TLJ 2 /4 -1S_3 Loepp, Victoria T (DOA) From: Jakabosky, Troy <Troy.Jakabosky@bp.com> Sent: Thursday, February 05, 2015 10:56 AM • To: Loepp,Victoria T (DOA) Cc: Allen, Kenneth W;Willingham,James M Subject: RE: PTD#214-153 L-01A 7" Cement job Attachments: L-01A ST PROPOSAL two stage.pdf; L-01A_10_60_interpretation.ppt Follow Up Flag: Follow up Flag Status: Flagged Victoria—here is the screenshot of the 7" casing shoe and interpretation. I also updated the schematic to as-run,for the 7" casing depths. Thanks,Troy Troy Jakabosky Drilling Engineer bp 900E. Benson Blvd.Cube 748C Anchorage,AK 99508 Office 907.564.4868 Cell 907.632.2609 From: Jakabosky, Troy Sent: Wednesday, February 04, 2015 1:55 PM To: 'victoria.ferguson@alaska.gov' Cc: Allen, Kenneth W; Willingham, James M Subject: PTD # 214-153 L-01A 7" Cement job Victoria—during our 7" cement job,we had a pack-off 80 bbls from plug landing. Pump pressure increased to 1900 psi when the pack-off released. The displacement continued with full returns.Total loss of mud was 10 bbls. Seepage/Loss rate before the job was 20 bbl/hour. We ran a USIT to verify isolation between permeable zones. Our Petrophysicist evaluated log confirming zonal isolation. Results attached. « File: L-01A_10_60_interpretation.ppt>> We are proceeding with operations to drill production hole as per Permit to Drill. Thanks,Troy Troy Jakabosky Drilling Engineer 1 TREE= VNELLFEAD= S/�1f NOTES: ACTUATOR= L-01 /,, KB.ELEV= 68.83' BF.ELEV= 42.65' 2200' 4-1/2"HES X NP,D=3.813" KOP= 2300' 8.75" restriction -200 ft I H Max Angle= _@ 1 r Datum MD= - Datum TVD= 888 HES ES Cementer 2558.6 f+ 800' 1021' — Tam Port Collar Baker ECP @2567.11 MLLOUT WNDOW(L-07A) 2709"--2719' 9-5/8'VVHPSTOCK(_/ /_} ^-2709° 9-5/8'CSG,40#,L-80,D=8.835' —r -2760' GAS LFT MANDRELS ST MI TVD DEV TYPE VLV LATCH PORT DATE. 9-5/8"EZSV(_/ /_) —I •-2726' 5 4 3 — 2 / 1 r""'--"'-- ^- 7'TOC-500 MD ft above Schrader NA 3788° ^10,778' H4-1/2"HES X NP,13=3.813" -10,809' -17"X 4-1/2"HES TNT PKR,II 3.870" 211 10,841" -14-112"FES X NP,D.=3.813' I 1 --"-- -10,911' H4-1/2"HES X NP,10=3.813" 4-1/2'TBG,12.6#,VT 13CR-85, -10,927' _0152 bpf,D=3.958' ----..----- -10,91r HTOP OF 4-1/2"LNR > 6................................... 17'X 4-1/2'BKR ZXP PKR H -1092'i ( L 10,92r H4-1/2"WLEG,13=3.958" r 7"CSG,26#,VTHC L-80,.0383 bpf,D=6.276" —-11,034.3' , I rgk " Minimum ID = " 1X1 1)4 IX1 >4 El 4-1/2"LNR,12.6#,Hydri 521 13Cr-80,.0152 bpf,ID=3.9-$ 14930' DATE REV BY COMNB'ITS DATE REV BY COMMENTS FRUDHOE BAY IMT VVE.L: L-01A PERMIT No: API Nb: BP Exploration(Alaska) 0 • . 0 +r N 11 La. a 4.1 a-• (n O -a Va = � c }, 0 � c >O N L C U) W O a) N n Q N to to Q CO U = U c to C N N N >+ o .. O_ • 4) 4) — .4_, -1--, 0) a. — = -4-0-, ...... 41 0_ :..- co ,.... co LL a. � - .� � Z o a) w 'r. - ....- c'Sv -8Dam a Mi • •olH9 I E .� , Y N .2f t'-'-' YO iii (t‘ C I- �1 R3 i • Mi _luaeQ O O - =l 0) .., .� k O ' • co r 2.r ,, Mil - 009 L - I 1 • ' I luuv9\t Z 1 I ,,,.:.0o '. 0 .G , iiQ d N .n 1,. 'V zlo o- Q o m E � E Iwo- ii o U c CI) F' ,I 1 I{I o li 111 I i Q p IQ m o `[ E ` 890 up szo o .• ; ,-.1.0 a � cF= a Rie P-,r n E o m 1,00- ,Il c lue«ly o zO _- .--..-----...=--.- W W Lo :_.-z...: ==_r-:-+,r } =1,--1-^-:"-r-.t r-"-ri-.=-a. L•L- ---pppg0, =O Old ._,I~ V -i CA . - W W _ II•' 1 , 008'0- • ifl • N 'C G6L Z- 5 = I=- ..,15 t t,6L b' d E 0 Cn d O R 4u.py W . = c - k .e •m c �«'////��,' t ~ N .N to U) I 005 t ' .a p ? o Lm CU w°xly W O /1 1 d Z D_ U ` 0 05��. • UW * 0 � d c t�1` .� 01 m �l7 ..0 --� ___ y O U R OS C\1 - }, CD U- L S. -I--+ O 1 O O 1 • e 20 a) 4...., ..c 4-, — -1...0 4,1• 0 a) CD I- -0 4-, (N1 0 ._. C DCI) .— 0 ...... 4-, _c 4-, 0 0 < .4..., 4.4..... C 72, 4-, as 0 aZ ' mu) a) F ffs -1••• ' ........ .4,..s ..• 1111 ,11111111 A CL a) 0 > 'E 0 (4 • 0- F-- c C = a) 0 ._0 4-• a = . a) sru > 4-• a) 0 .1- c) as , 0 a) E 4 I— 1., Crn r 03 (/) al'.1 •••114 111.1 . 1*101101100 • 110110 . 1 ' 0 i• ,, ..1- • ' . 1,1 ' I , 1 ' ' , C.3 I DS'SS he:, '" I r..• i I ilk i W ' , I rr% • 1 1, .1 , . V 01,11 1 1111 1.,,.1 1 4 I/1,p1 ,li CV." .. / n A i ,, . .- CO OS'I L. . 1 OW e 4 . er.i 1 i . . 1 g ,g g CO toff MIK I .„ 1 lolt III•Iolo I El •low . • •,, ,p',a r , ' . 1 I I 10 IS I cr. ililll i,, ,, 1 1 tommaiiiiii. 1 rigirli 11# I i 14•• Ir-- ..c. ..0 I.I.l ;eloW•I - - . •• .• • CD IMEICIE wifIl1 C ''" :iii;HILSIISF‘Alwill.L14 ,,,...th'OIL I . t.hili:mr. A , ,.: -.4 - JAPT.P.W...........".........• .47,,,:" ,, lamer' 0- IT: iffeNOW.LT-S10 • -.•'.. ..,•,• •••••••, -r "ript.e ."'.,,j._?'"=,‘,_"'"e''''''_ ..__ ,,,.• ...,,_"1" ..47 . _14_ .....__77.21-4; "'W"iiji-NO.r."e'er•• gr Awie.,07e1/a,L,,,, r'rme...16:5;'.4.4,..,'. '111-1 DIY DIM I SWIMS. obsrnmil.mwmffilf" .... a.. .4-e.---•—o-.-,—.---.—.--,---n----*---" .---- .---...- Z-4-..,.-.^-o;iw.,.,. ;,...%•,....-....o... ...e..r _ ,. . ......yri_ .%.e.d9r........1.11P•47-3,..',...-'• is) .7.„,..! . irommi. ii, wg1 ,..voic:10 ,ir ._, .„ ,,, .,,, ..---. ... ._„.4=1, ,,,,___...,,,,„_714s.....iiiha,__ 41...._„.....joistio ,.•. .r .1.. i . r""1"." .,..11111Lr ISITDItri- • '—"_ _---'__'.____—______________. `_... _ _ _ - - r , -YE-r-.--r a-r:morn-•rm.rm ,. PT .•• ODela- - -....1. LID DPW Illr Dm i litr 1.1•1010. I Z --. rl •••• ciXi r"r• 1 E" Z Z Z Z w •-. It •-• Ca I IV W la I mI rot cal r.:9.I mI = La LI = ur: srl M" 1 :r : 1 ta.4 0 ., 1-11 ID . . i • Cr, r 1 03 • • 6 Nt (-• ' • i • I I 1 If ....„....... .•.2 ''.'i !.:. •,,, A V .. co .e cn Ir. in i a 1 1 g 0 0 g 0 o o In urn 1%. 0 iNi tn N Lo er in 0 In in -I- 1 • • 20 C o 0 ...... ,x) 0 co = o co w (NI co co as N• C\C3 •— "Sr I 03 .— 0 -0 ...... I-L A 4-, = CO C4...., S... 0 = 0 a) c cn 4• n• a 0 (1) C a) 4,.. co w a P., ' tu- m > .., — co co 1._ tiN(6-4.1.444114*0 WA'lliikWILM ko ni N . r: t. . 4 i licE 11 1 1 "'PIN' 4 ...Ili 16,,'1*r.14.0'1 1Viiri'lipee,44:8 P.40,11r 0 .. z: , , fly • ' / . I DU IMO I • fi• 'II 40 •1,ii' a 1, .1, , 'qr,;4''4 4,' Tramrr tfipi a 1 l'40Wi Ili'f . "V DS 0 1 •1 r&— u..-r•art. 11 L 1.}- "} I Arelelige e I C In i i; ,.I ,, .. ii._, . ... -I' ll, . • 5 u . . t 1 I, (13 "I1 . . A ... . .. 'i d Iiir e Ad. t 1 1 II 1 . I t . ,.. ,1' 1 Iri Lf, n 1 1 4 ..LAiii (...) , :3.4 -4- 444 'H ' 1 i ' 11111 . , I 10/010111111 000 f 1 , N . ,. -- . . .._ .. _ „: .- CI . , „ .,-,-a .... • C :...... . . .t kJ be ' , 9 (1) 11V-NOLLIVNC) -. 2- L.1 rs. I- I- I I- I llll I I . . r- , 1111 IfIll ., . . .. C3 f 0 fli2.1.1 0. fill m•CD ItiftOliplit /If CO ir)1,1111)114i0 Lg.: g...1-1.1..rii C 45 L'.1 40 rsi ry rri ' 2 { 11104 - i 3 CO , T- 0 1 ., . 1 1. .. . . •• • 1 0 . . .. .. . 0 CY 8 , a c• a cp C ...r In D 2 Zi L 0 C-04 co 1 c;: 1.1 co Co • I 1-- c c) • 0 -) _0 (0 c\I CNI cl) ._ -1—• 00 00 A ...... CD _CC13 CNI--- C° a) 42 W It -C u) E (1) CD ..7, ...""••• a o (13 (I) L, cf) L_ H CO (I) P— 0 . . - , 0•1.....:f....i.14 n . ,, PIPIT P?IPIIII rNirn •••I 400.4y.dniVAINA , P 'n! - iltdi°1 '1 4 ' 1' •, ' , ., 1:W41411.4 ql. -'IL LL4r,1 fir Ir°k I rw- r-.7 11* (n ...,..... 7 : 7 il nf....7;iico'477- (/) i...,.. ,,,7) , , I 0 .. .,..,.,.................„. - --,..- , I > _.... -....r.o.......1m.........••••••• ,,,,, , :11, $ I DODD I F :: t• (X) o w ii i I .1 CO 1 ..,... I , • • , ......., , (NI ,._-______________ ... ,. . .. _ _ - .-- - ..• . N rw-NouvN07 1 I P F-^ -''' o o o o o o o o o o o , .. . 0 0 0 E3I CCNO1 201 1 (9,1 I, 41104100;101.0p ,- • - • • • • " " ;.• '.4 •t• 1..1, .4, 'I! ... g li 2,rrY,14 ill ., rn Cr) • a N (3 0 0 in 0 (4 Ul Ul N 0 -1 0 N. CL - 111111111111 , 11111 . . 111 . . 111 I II I 1 1 1 I I I 0 . _ I „ V-- r,'-`-- ---- .• III 4'ji:...• •:°: .... ",i1".... Y- " • PTD z /4— 5-3 Loepp, Victoria T (DOA) From: Jakabosky,Troy <Troy.Jakabosky@bp.com> Sent: Wednesday, February 04, 2015 1:55 PM To: Loepp, Victoria T (DOA) Cc: Allen, Kenneth W;Willingham,James M Subject: PTD#214-153 L-01A 7" Cement job Attachments: L-O1A_10_60_interpretation.ppt Victoria—during our 7" cement job,we had a pack-off 80 bbls from plug landing. Pump pressure increased to 1900 psi when the pack-off released. The displacement continued with full returns.Total loss of mud was 10 bbls. Seepage/Loss rate before the job was 20 bbl/hour. We ran a USIT to verify isolation between permeable zones. Our Petrophysicist evaluated log confirming zonal isolation. Results attached. We are proceeding with operations to drill production hole as per Permit to Drill. Thanks,Troy Troy Jakabosky Drilling Engineer bp 900E. Benson Blvd.Cube 748C Anchorage,AK 99508 Office 907.564.4868 Cell 907.632.2609 1 • Q O N • d' S 4 0 cfl 0 0 • • a 0 - a t I i — •. _ 0 7 ;,. n o h sbo}I 5 c c 4 ! o r ag1 I 4 4 t $ oWI s i <- > xx4 # Ei �� X s H a i Fl- I I] , -.. ., y g T laLI_ \ 1� /7: 4 \ it k iN v T CV s a it e b :1 I _ o a N °� JI o J ' c I • II 01A i -0 x x J i 1 is $ LN WIN:WI L j 0) CO • • N 0 � Q3 , O (CS -1--, co N co oo A •.._ COCa a Lo co L. 4 O " aic a 13 `. a) CI (U (n > .L I— CO (n I-- v I.. - �- . o•r.;na..,.l " . N , rn o .. /A nl.lnul74-1.;, — — V J :::' t+ �u ti ,,,„ 4 I r„�r r i 1, I.I Q ,--.--;.--=-7-----,—.',..'=---:::,---- -. 1.5 1 « l o x'' , ����il -.-\ •1JI f111.I% 'I II r ,:T . .1� 1' et II v 1. CX) I`1 iv ,i , ti, 4 ...„ LaistiOrtsitiro, - . Cs N.� MEM r O O O O O 0 O O O O 01 E1 O O O O O 010 O O M tl' n CO 01 n r. r, r, O O I 7 .+ N M co co r CO * il{ nt�01104000.w.:-..:••-.7-1,-.-•-r-...-.7.4-7-...7-••:t.-:-.7---7.• 40,0040001 gOg: N p 1 1 , b i 0 0 o o a g ^ in u0i w o, a Cho ,__ o ‘f),, ey"' r 0 1 (`Cl 0 s • • C 0 co R3 ci)N 4- O co u) N 0 (/) CO (6 LO O _ coUd. N L.i_ A cY C O O 40- N O 0 O 0 " N (0 O V) CO vco a3" 4•••+ C1' IL al 4 " N...‘4-11Yt'-' 416j* W tl 444V4414 Fr A Fr ri, , j it r r'I 4111 �'ySLL 14, i co 1 i 4 11 it , ' 1 I '4 au POD ' II v' a .. r .. }#'�p�"o. ,1 .,� �.. *s'Tls Ili t' •p• Ni,"" I. } 1 ,!t 'y�' r 1. I!s,At l, r 2 t°" :. VPi'9 - r '1' �� 1# til i htlL. C - .�� .i, F ,�` t f1i '1 as . jam. PI tJ' ' wL. / [. .. .r +1' 'e �. 1 1 r 1I wi h avr I r . r, ,� 4 �}. aa'PPi 1 s a �. I i' I.1,1"/.t rr t � �� i r,aaol I a Jam: 1 d..,r 1 .- iiiiii.\±i 11 ill 1 11 r ir ilt1 Mt I or . . I. i N N - a '�'� ..J- ti -, o _ C ^ ... ......e...._......_�.a_._...�_ _- W v 11W NO11fo NC ' u 0 P4 MI .�.� ,_, o 01 C3CI m 14 all 4D Cq Ili 11‘ 1111° "12 'err?, r:j....—L-1...L.R,..., . . . . , . . I ni IIs a „ 0 0 0 0 a 0 ay ......... 0 0 o a ry 0 0 N. m 0 CO C a5 03 CO OD • • -6:LO a) o �� o � . D V) N Q +-• co c) Co Z i) (I)..cALo O E a) U > ..— O co Q— H c 4— C) O O CO u) Q a" N . > L +.3"O > N0 •UQ t U 4 cn 1K .$ V J :H ; u, • .. 4 • v > °troop' .:, ....r ark v-i" :,, .0,41,..i. '11-1 rf, 'OC'. 1. ' 1. „ .., '4 ! i ..,. Ta GCS 1 . '. �,n1 ' i0 ,, I1 �' I:J. ��'�. �L •l i 41a11'1ti{ `. AIrji' ji� A ort• 4, kr'-''' ' Li: Li ' J,5 i 1 L , . 1 4 414 04'4' ^I R , ;�, ., ifI` ' ,,i1^I ., , ■ 1]it., .'r. , !41. CX) 09'C •• 5'/h h '1,•11 1 .1'1.4.. ,,� •. I; , h , hr 4 .1i , i 4 CO Ulr ppp(11 ' � rr , r, '/! a 1 ' r .} C'i3 'J c _ g rn I . _.. L •• ' . ... Iltil 11 1 M1J u-1 ^ , L / PI10P0f,1 Ori a �5„f � ,.. 1,0C ��, � ir iffrillr*- OR006f �_ .'7ar uar n..._ a—^ ^T'1,': ' '5'i '4Y,.,,_ ' ` +1'22... +r. gl10..'Y.. .7 41. pU DIM I Po'ooh ' •r.' : T..vd/C .... l�.. •••• •u 5t r ,aoR�dri.,},�� }"' { pa OILY- �y. ti....rr; '.r—,d .u'� ! 3 01'01.9!- ,``'" PV POPP.f- z .. M •• A YS n n @ rt, t_ q `' If ca. i1V NC - ZI X f �I z x nl .u.�. '� MI >1 �I m M u1. 1.1 n 0 LL . ._' . ' " i ' ' . ' I . I • h .'i I I iel V f V •1 •.1 ,1 \.......... 1 ........1. .. .. .r ..1........ .1 I1 . •, •r •r l0 rel l . ' -t ovt000iiitodAih 611114$1401,16.1447 re • f+'1 01 O O O in 0on a in /i1 n co 11. 4!1 N. tt. 't' U9 41'1 in Ory V OF • • 4,1'fr I%%% A THE STATE h,`ac.i aEnic2 a use _ 333 \lost Severin Av.nue GOVLRNOR SI'AN PARNI-:I.L Anchoroge Alosl:o 99501 5572 (sol n: 907 279 14133 Ken Allen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU L-01 A BP Exploration (Alaska), Inc. Permit No: 214-153 Surface Location: 2394' FSL, 3660' FEL, SEC. 34, T12N, R11E, UM Bottomhole Location: 5217' FSL, 2995' FEL, SEC. 34, T12N, R11E, UM Dear Mr. Allen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy '. Foerster ,, Chair Z DATED this day of October, 2014. STATE OF ALASKA V ED ALASIOIL AND GAS CONSERVATION COMMION PERMIT TO DRILL `� " E2 11 201 20 AAC 25.005 1a.Type of work: 1b.Proposed Well Class: 0 Development Oil 0 Service-Winj 0 Single Zone - 1c.Sp s ro osed for: 0 Drill 0 Lateral 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 Coalbed Gas 0 Gas Hydrates 0 Redrill‘0 Reentry 0 Exploratory 0 Service-WAG 0 Service-Disp 0 Geothermal 0 Shale Gas 2.Operator Name: 5.Bond 0 Blanket 0 Single Well 11.Well Name and Number: BP Exploration(Alaska) Inc. Bond No 6194193 ' PBU L-01A 3. Address 6.Proposed Depth: 12.Field/Pool(s) P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 14930'' TVD 9035". Prudhoe Bay/Prudhoe Bay. 4a.Location of Well(Governmental Section): 7.Property Designation(Lease Number): Surface: ADL 028239 2394'FSL, 3660' FEL, Sec.34,T12N, R11E, UM • 8.Land Use Permit: 13.Approximate Spud Date: Top of Productive Horizon: 3363'FSL, 353' FEL, Sec.34,T12N, R11E, UM December 1,2014 Total Depth 9.Acres in Property: 14.Distance to Nearest Property: 5217'FSL,2995'FEL,Sec. 34,T12N, R11E, UM 2560 6175' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 95.65' • feet 15.Distance to Nearest Well Open Surface: x 583256' y-5978116' Zone- ASP4 GL Elevation above MSL: 48.7' • feet to Same Pool: 1000' 16.Deviated Wells: Kickoff Depth: 2710' •feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 107 degrees Downhole: 3866 - Surface: 2999 18. Casing Program Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 8-3/4" 7" 26# L-80 VamTop HC 11077' Surface Surface 11077' 8740' 840 sx LiteCrete, 111 sx Class'G' 6-1/8" 4-1/2" 12.6# 13Cr85 Hydril 521 4003' 10927' 8617' 14930' 9035' Uncemented Sliding Sleeves w/Swell Packers 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth TVD(ft): Junk(measured). 9528' 9209' None 9428' 9110' Unknown (2) Casing Length Size Cement Volume MD TVD Conductor/Structural 80' 20" 260 sx Arctic Set(Approx.) 29'- 109' 29'- 109' Surface 2733' 9-5/8" 450 sx Arctic Set Lite, 208 sx Class'G' 27'-2760' 27'-2601' Intermediate Production 9485' 7" 186 sx LiteCrete, 145 sx Class'G' 24'-9509' 24'-9190' Liner Perforation Depth MD(ft): 9124'-9262' Perforation Depth TVD(ft): 8811'-8947' 20.Attachments: 0 Property Plat 0 BOP Sketch ®Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis 0 Diverter Sketch 0 Seabed Report 0 Drilling Fluid Program 0 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date 22. I hereby certify that the foregoing is true and correct: Contact Troy Jakabosky,564-4868 Printed Name Ken Allen Title Engineering Team Leader Email Troy.Jakabosky@bp.com Signature j C��---"—� Phone 564-4366 Date 9/a i/ /171 Commission Use Only Permit To Drill , / ,-, API Number: Permit ApprovalDat See cover letter for Number: .,2/ /S ,5 50-029-23011-01-00 1� � 1 � other requirements: Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained shales: Other:Qp P f S 71-c 35 I2C p / Samples Req'd: Oyes �No Mud Log Req'd: 0 Yes [�No f}n yt t i q r" f C-5 f- f-p 26-66P 5 , HZS Measures: IlgYes 0,N o Directional Survey Req'd: [' Yes 0 No Spacing exception req'd: 0 YesI No inclination-only svy Req'd: 0 Yes eNo I) . P ,, APPROVED BY APPROVEDOBY J COMMISSIONER THE COMMISSION Date `0 " � '/ Form 10-401 Revised 10 012 This permit is valid for 24 months from the date of ap royal(20 AAC 25.005(g Submit Form and Atta ments In Duplicate VL /P/Z/ l /4 nol INA /0/y P95b./4J • Ar 44, 44 To: Alaska Oil & Gas Conservation Commission From: Troy Jakabosky, ODE Date: September 26, 2014 Re: L-01A Permit to Drill The planned L-01A well is currently scheduled to be drilled by Parker 273 in December 2014. The rotary sidetrack is a horizontal Ivishak producer. L-01 will be abandoned and tubing jet cut pre-ng: The 4-1/2" tubing will then be pulled with the rig. 7" casing will be cut and pulled. A whipstock will be set in the 9-5/8" casing at-2,710'. The intermediate hole is planned as a liner with the shoe set in the top of the Sag River Formation. The production interval will be completed with a.eementedrdperforated liner. IinCGv,t✓tc4' S/r�/��r S/c<v<s t.-/ i f1� The maximum anticipated surface pressure from the Ivishak/Sag with a full column of gas from pu`kc`-:, TD to surface is -2,999 psi (assumes 8.6 ppg as max pore pressure and 0.1 psi/ft gas gradient). This well will be drilled by Parker 273 using their 5,000 psi four preventer BOP stack (3 rams and an annular). The BOP rams will be tested to 3,500 psi and the annular will be tested to 3,500 psi. A detailed operations summary is included with the permit application. Below is a brief summary of planned drilling operations. 1. Move in and rig up Parker 273 2. Nipple up BOPE and test to 3,500 psi 3. Pull 4-1/2" tubing from -3,000' MD to surface 4. Cut and pull 7" casing 5. Set whipstock, mill window in 9-5/8" casing. Perform LOT. 6. Drill 8-3/4" intermediate section to TSAG casing point 7. Run and cement 7" liner (TOC will be -650' TVD above SB-NA). Pressure test casing to 3,500 psi. 8. Drill 6-1/8" production interval to target Zone 4 sands. Geosteer as required. 9. Run and 4-1/2" Cementless production liner. 10. Run 4-1/2" production tubing. Set the production packer and pressure test to 3,500 psi. 11. Freeze-protect and secure well. 12. Rig down and move off Parker 273. In addition to a planned well summary, a directional plan and proposed completion diagram is attached to the permit application. If there are any questions concerning information on L-01A, please do not hesitate to use the contact information below. Troy Jakabosky Office: 907 564-4868 Cell: 907 632-2609 Email: troy.jakabosky@bp.com Attachments: L-01 Wellbore Schematic L-01 Proposed Pre-Rig Schematic L-01A Proposed Completion Directional Plan As-Built Survey BOPE Equipment Schematics Well Head Schematic Tree Schematic L-01A PTD Page 1 9/26/2014 • ! Planned Well Summary Well L-01A Well Producer Target Ivishak Type Objective Current Status L-01 — long term shut in Estimated Start Date: 12/1/2014 Time to Complete: 36.5 Days Surface Northing Easting Offsets TRS Location 5978116.04 583255.98 . 2855.8 FWL 1619.3' 12N 11E sec 34 Tie in Northing Easting Offsets TRS (Sidetrack 3402.2' FNL / 2,033.5' point) 5977604.37 583676.87 FWL 12N 11 E sec 34 Northing Easting TVDss Offsets TRS Tgt 1 5978953.69 586646.56 -8,639' 2,086.4' FNL / 12N 11E Sec TSGR 5020.5' FWL 34 TSAD 5979122.79 586550.61 -8,844' 1916.2' FNL /4926.8' 12N 11 E Sec FWL 34 BHL 5980946.86 583884.33 -8,939° 62.3' FNL / 2,284.4' 12N 11 E Sec FWL 34 • • Planned KOP: 2,710' MD / 2,467' Planned TD: 14,930' MD / 8,939' TVDss TVDss Rig: Parker 273 • GL-RT: 46.95 RTE (ref MSL): 95.65 Directional — Schlumberger P12 KOP: 2,710' MD Maximum Hole Angle: 52.25° in the 8-3/4" intermediate section -107° in the 6-1/8" production section Close Approach Wells: None 2,710' MD to 3,000' MD = INC+TREND Survey Program: 3,000 MD to TD = MWD+IFR+MS Nearest Property Line: 6,175' Nearest Well within Pool: -1000' L-01A PTD Page 2 9/26/2014 • Formation Tops & Pore Pressure Estimate (SOR) P/�.a,ea- 1 Estimated Minimum Most Likely Ate4,41 kJ.- Formation Formation Top Pore Pressure Pore Pressure ���� (TVDss) (EMW ppg) (EMW ppg) SV2 2108 8.35 8.6 SV1 2445 8.35 8.6 , /*<d P UG4 2747 8.35 9 UG4A 2773 8.35 9 UG3 3105 8.35 8.85 UG1 3565 8.35 8.85 UG_Ma 3872 8.35 8.85 UG_Mb1 3912 8.35 9 UG_Mb2 3975 8.35 9 UG_Mc 4055 8.35 9 SB_Na 4123 8.35 8.7 SB_Nb 4148 8.35 8.7 SB_Nc 4176 8.35 8.7 SB OA 4330 4.42 - 8.7 SB_OBa 4394 4.42 8.7 SB_OBb 4435 4.42 8.7 SB_OBc 4472 4.42 8.7 SB_OBd 4472 4.42 7.21 SB_OBe 4472.001 8.35 8.7 SB_OBf 4555 8.35 8.7 /a 3 CM3 4600 8.4 9 CM2 4881 9.6 10 CM-1/TLBK 5570 9.6 10 HRZ 6160 9.6 10 TKLB 6375 9.6 10 TKC4 6450 6.32 9.25 LCU/TKB/TKA 6650 9.81 10 TKA5 6750 9.81 10 TKA4 6770 9.81 10 TMLV 6830 9.6 10 /2'6, TKNG 7535 9.6 10 /C,e TJF 7645 9.6 10 6 TJE 7944 9.6 10 TJD 8098 9.6 10 TJC 8385 9.6 10.1 TJB 8487 9.6 10.2 TJA 8550 9.6 10.2 TSGR 8640 7.4 8.6 /L:::5" 7 SHUBLIK 8680 7.4 8.6 g.91 EILEEN 8809 7.4 8.4 IVISHAK 8844 7.5 8.4 /; Z fr. 30_/5/ L-01 A PTD Page 3 9/26/2014 • S Casing/Tubing Program Hole Liner/ Wt/Ft Grade Conn Length Top Bottom Size Tbg O.D. MD/TVDss MD/TVDss 8-3/4" 7" 26 L-80 VamTop HC 11,077' Surface 11,077'/8,644' 6-1/8" 4 '/z" 12.6 13Cr-85 Hydril 521 4,004' 10,927'/8,521' 14,930'/8,939' (-150' lap) Tubing 4 '/z" 12.6 13Cr-85 VT 9,461' Surface 10,927'/8,521' (-5' into liner TBS) Mud Program Intermediate Mud Properties: LSND 8-3/4" hole section Depth Interval Density PV YP API FL HTHP FL MBT pH (ppg) KOP-5,867' MD 9.3 -9.6 <17 18 -25 <8 NA <18 9 - 10 5,867' MD-9,523 MD 10.3 - 10.6 <17 18 -24 <8 NA <20 9 - 10 9,523 MD- 11,077 10.6-10.7 <20 18 -24 <4 <10 <20 9 - 10 MD Production Mud Properties: Water Based Polymer Fluid (PowerPro) 6-1/8" hole section Low Shear Depth Interval D�pP9 (cp) (Ib/OOft2) API FL Rate MBT pH Viscosity 11,077' MD -TD 8.9-9.2 <12 10 -20 <10 >15,000 <4 8 - 10 Logging Program 8-3/4" Intermediate: Sample Catchers-as required by Geology Drilling: Dir/GR/Res/Neu/Den Open Hole: None Cased Hole: None 6-'/8" Production: Sample Catchers-as required by Geology Drilling: Dir/GR/Res/Neu/Den Open Hole: None Cased Hole: None Cement Program Casing Size 7" 26#, L-80 VAM TOP HC, Intermediate Liner Lead: Open hole volume +40% excess Basis: Lead TOC: Target 500 MD above SB_Na Tail: Open hole volume +40% excess + 80 ft shoe track Tail TOC: 500 ft MD above casing shoe Total Cement Spacer -50 bbls of Viscosified Spacer weighted to -11.6 ppg (Mud Push II) Volume: Lead 217.0 bbls, 1218 cuft, 840 sks of 12.5 ppg LiteCRETE, Yield: 1.45 cuft/sk Tail 23.0 bbls, 129 cuft, 111.4 sks 15.8 lb/gal Class G- 1.16 cuft/sk Temp BHST 235° F L-01A PTD Page 4 9/26/2014 Casing Size 4-1/2" 12.6#, L-80 HYD 521 Production liner Basis: Sliding Sleeve/Swell Packer Cementless Completion Total Cement Spacer N/A Volume: Lead N/A Tail N/A Temp N/A Surface and Anti-Collision Issues Surface Close Proximity: No wells will be affected by the Parker 273 rig shadow. / Sub-Surface Pressure Management: Get PFO data in L-105. Use data to understand required SI period to draw pressure down. Get SBHP to confirm pressure as needed prior to spud. Schrader Interval: Ensure offset producer V-203 is on if L-213 is injecting. L-213 should not be on MI when drill L-01A. Kuparuk Interval: Shut in L-105 in the time frame determined by the PFO surveillance data collected in June/July 2014. V-104 to be on WI prior to and during drilling, and to be SI during drilling of L-01A intermediate hole. Keep offset producers L-107, V-102, and L-104 online up to point of drilling, and while drilling L-01A. Ivishak Interval: L-04 to be on WI prior to drilling, shut in WI in L-04 1-2 weeks prior to drilling ivishak interval. Anti-Collision: None. Wp08 passes major risk criteria. Hydrogen Sulfide L-Pad is considered an H2S site. Recent H2S data from the pad is as follows: Well Name H2S Level Date of Reading Parent Well (if sidetrack) L-01 22 5/7/2010 #1 Closest SHL Well H2S Level L-04 N/A(Inj) N/A #2 Closest SHL Well H2S Level L-107 16 2/9/2014 #1 Closest BHL Well H2S Level V-203 34 6/5/2014 #2 Closest BHL Well H2S Level N/A N/A N/A #3 Closest BHL Well H2S Level N/A N/A N/A #4 Closest BHL Well H2S Level N/A N/A N/A Max Recorded H2S on L-120 170 5/18/2014 Pad/Facility Faults Throw Formation Where Encounter MD TVDss Direction Uncertainty Lost Circ Fault Intersect Intersect and Potential Magnitude Fault#1 - Schrader(Lower OBB) 5,865.0 4,480.0 West, 110 ft. +/- 100' MD Low Fault#2 - Miluveach 9,100.0 7,030.0 South, 200 ft. +/- 100' MD Low Fault#3- Kingak (TJC) 10,797.0 8,420.0 South, 50 ft. +/- 100' MD Moderate L-01A PTD Page 5 9/26/2014 • • Drilling Waste Disposal • There is no annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul Class I waste to DS-04 and/or Pad 3 for disposal/Contact the GPB Environmental Advisors (659-5893) f/guidance. Well Control Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. BOP test frequency for L-01A will be 7 days during the de-complete phase. Once the window milling begins, a full BOP test will occur every 14 days with a function test occurring every 7 days. Except in the event of a significant operational issues that may affect well integrity or pose safety concerns, an extension to the 14 day BOP test period should not be requested. Intermediate Interval Maximum anticipated BHP 3,866 psi at the TSGR at 8,640' TVDss (8.6 ppg EMW) Maximum surface pressure 2,999 psi (.10 psi/ft gas gradient to surface) 25 bbls with 13.2 ppg frac gradient Kick tolerance Assumes 8.6 ppg pore pressure in the TSGR + 0.5 ppg kick intensity and 10.6 ppg MW. Planned BOP test pressure Rams test to 3,500 psi/250 psi. Annular test to 3,500 psi/250 psi 7" Casing 3,500 psi surface pressure Integrity Test—8-3/4" hole LOT after drilling 20'-50' from middle of window 7" Casing Rams The 7" Casing Rams will be installed on the initial BOPE test and remain in the upper rams until production interval. Production Interval Maximum anticipated BHP 3,863 psi at TSGR at 8,640' TVDss (8.6 ppg EMW) Maximum surface pressure 2,999 psi (.10 psi/ft gas gradient to surface) Infinite with >9.7 ppg frac gradient Kick tolerance Assumes an 8.6 ppg max pore pressure in the Ivishak + 0.5 ppg kick intensity and 8.9 ppg MW. Planned BOP test pressure Rams test to 3,500 psi/250 psi. Annular test to 3,500 psi/250 psi Integrity Test—6-1/8" hole FIT after drilling 20'-50' of new hole 4-1/2" Liner Top Packer 3,500 psi surface pressure Planned completion fluids 9.4 ppg brine L-01A PTD Page 6 9/26/2014 ! . L-01A General Operational Summary Proposed Pre-rig prep work: 1. P&A perforations with 22 bbls of cement. Drift and Tag TOC. Pressure test cement. MIT-T to 2,500 psi. 2. Pull DGLV at 8627 ft. 3. Pump balanced cement plug with -63 bbls of cement. Drift and Tag TOC. Pressure test cement. CMIT-TxIA to 3,500 psi. 4. Perform E-line jet cut on 4-1/2" tubing at-3,000' MD 5. CMIT-IA to 3,500 psi. 6. Install Dry Hole Tree. Install Annulus Valves. Set TWC Proposed Drilling Rig Operations: 1. MIRU Parker 273. "' 2. Test TWC from below to 3,500 psi for 5 minutes. 3. Nipple down tree. Nipple up and test BOPE to 3,500 psi. BOPE configuration from top down: Annular, 7" Casing Ram, Blind/Shear Ram, 2-7/8" x 5-1/2"VBR Ram. 4. Pull TWC with lubricator. 5. RU hard lines to BOP. Circulate out diesel freeze protection through choke to tiger tank with clean 8.5 ppg seawater. 6. RU and pull the 4-1/2" tubing from the pre-rig jet cut. 7. Cut the 7" casing at-2732 ft with multistring cutter. 8. Pull the 7" casing 9. RIH with 9-5/8" clean out assembly down to the 7" stub. 10. Change 9-5/8" Pack-Off. Pressure test to 3,500 psi. 11. PU 9-5/8" whipstock, bottom trip anchor and 8.75" window milling assembly (to include full gauge string mills). RIH to 2710 ft(TOWS), orient and set the whipstock. 12. Swap the well over to 9.3 ppg fresh water LSND milling fluid. End of Sundry: Start of Permit to Drill 13. Mill window in the 9-5/8" casing plus 20' of formation. 14. Perform LOT (25 bbl- 13.2 ppg EMW, 50 bbl- 14.5 ppg EMW). POH for drilling BHA. 15. MU 8-3/4" drilling RSS BHA, GR at bit/GR/RES/NEU/DEN/PWD and RIH. Kick off and drill 8-3/4" intermediate interval. 16. Drill 8-3/4" intermediate interval to section TD in TSGR at-11,065' MD. Weight up drilling fluid using spike fluid maintaining the following density ranges: • KOP-5,867' MD: 9.3 - 9.5 ppg TD • 5,867 MD-9,523 MD: 10.3 - 10.6 ppg • 9,523' MD- 11,077 MD: 10.6 - 10.7 ppg 17. At TSGR, CBU until hole is clean (minimum 5x) and POH on elevators to the ghost reamer depth. 18. RBIH, circulate well clean, and POH on elevators. 19. Run and cement 7", 26#, L-80, VAM TOP casing to TD. 20. Change upper 7" casing rams to 2-7/8" x 5-1/2"VBR pipe rams and test to 250 psi low/3500 psi high. L-01A PTD Page 7 9/26/2014 • 21. MU 6-Y8" drilling BHA with PDC, Archer 475, and GR/RES/NEU/DEN. RIH to the landing collar and test the casing to 3500 psi for 30 minutes. 22. Displace the well to 8.9-9.2 ppg Flo-Pro fluid prior to fully drilling out shoe track. 23. Drill 20' of new formation and perform a FIT to 9.7 ppg EMW(infinite kick tolerance). 24. Drill 6-1/8" production hole to TD at-14,930' MD. -- 25. Circulate bottom ups and condition the hole as necessary. 26. Short trip BHA to 7" shoe pulling on elevators 27. Trip in hole to TD and circulate/condition the hole as necessary until shakers clean up. POH on elevators. 28. MU and run 4-W 12.6# 13CR Hydril 521 liner with swell packers to TD. 29. Set liner top packer and displace well to 9.4 ppg brine above the liner top. 30. POH, L/D the liner running tool. 31. R/U and run a 4-W, 12.6#, 13CR, VAMTOP tubing completion with X-NIP at-2250 and GLMS. Space out and land the tubing with tubing tail inserted into the liner tieback sleeve. 32. Make up tubing hanger per Cameron Rep. Land the tubing hanger, and run in lock down screws. 33. Displace tubing and IA to 9.4 ppg brine. 34. Reverse circulate filtered 9.4ppg brine and corrosion inhibitor into the tubing x casing annulus. 35. Drop ball/rod and set packer and individually test the tubing and annulus to 3,500 psi for 30 minutes. Record each test. 36. Shear the DCR valve. 37. With landing joint still rigged up, reverse circulate diesel freeze protect using rig injection pump. 38. Allow diesel to U-tube, drain stack, and rig down landing joint. Monitor well for 1 hour to confirm well is dead. 39. Install TWC and test from above to 250 psi low/3,500 psi high for 5 minutes each and from below to 250 psi low/3,500 psi high for 5 minutes low/5 minutes high. 40. Nipple down the BOPE. Nipple up the adaptor flange and double master valves and test to 5,000 psi with diesel. 41. Ensure Heet®is left on TWC and only diesel (no water) is left in tree 42. Install all annulus valves and secure the well. Ensure T/IA/OA all have two barriers in place. 43. Secure the well. RDMO. Planned Post-Riq Operations: Slickline : 1. Pull TWC, Pull Ball, Rod and RHC Plug with slickline. 2. Pull shear valve and dummies, install GLVs. 3. Open Sliding sleeves 4. Flowback per ASRC 5. Modify S-Riser as required. 6. Install flow lines and well house. L-01A PTD Page 8 9/26/2014 • L-01A Drilling Critical Issues POST THIS NOTICE IN THE DOGHOUSE I. Well Control / Reservoir Pressures: A. Intermediate Hole: The UG4 is expected to be a 9.0 ppg EMW. The CM2 is expected to be a 10.0 ppg EMW. Formation pressures will be controlled by weighting up to a 9.3 ppg MW before entering the UG4 TVDss). Another weight upwill occurprior (2,747 ) to enteringthe CM2 (4,881 TVDss 9 ( , ) by weighting up to a 10.6 ppg EMW. B. Production Hole: The lvishak is expected to be at a 8.6 ppg EMW. Reservoir pressures will be controlled by using 8.9—9.2 ppg water based mud thought out the production interval. II. Lost Circulation/Breathing A. Intermediate Hole: There are two expected fault crossings in the intermediate hole section. Be aware of drilling ECDs. B. Production Hole: No planned fault crossing in the production hole. Ill. Fault Locations Formation Where MD TVDss Throw Direction Uncertainty Lost Circ Encounter Fault Intersect Intersect and Magnitude Potential Fault#1 Schrader 5,865.0 4,480.0 West, 110 ft. +/- 100' MD Low (Lower OBB) Fault#2 - Miluveach 9,100.0 7,030.0 South, 200 ft. +/- 100' MD Low Fault#3 Kingak 10,797.0 8,420.0 South, 50 ft. +/- 100' MD Moderate (TJC) IV. Integrity Testing Test Point Test Depth Test type EMW(lb/gal) 9-5/8—window 20'-50' from the 9-5/8" window LOT 13.2 ppg 7" shoe 20'-50' from the 7" shoe FIT 9.7 ppg V. Hydrogen Sulfide ✓ A. L-Pad is considered an H2S site. Recent H2S data from the Pad is as follows: Well H2S Level Date of Name Reading Parent Well (if sidetrack) L-01 22 5/7/2010 #1 Closest SHL Well H2S Level L-04 N/A(Inj) N/A #2 Closest SHL Well H2S Level L-107 16 2/9/2014 #1 Closest BHL Well H2S Level V-203 34 6/5/2014 #2 Closest BHL Well H2S Level N/A N/A N/A #3 Closest BHL Well H2S Level N/A N/A N/A #4 Closest BHL Well H2S Level N/A N/A N/A Max Recorded H2S on Pad/Facility L-120 170 5/18/2014 VI. Anti-Collision Issues ➢ None CONSULT THE L-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. L-01A PTD Page 9 9/26/2014 I • PARKER 273 BOP STACK RAM TYPE BOP: DUTCH LOCK DOWN FLANGE SHAFFER LXT DOUBLE EICP 13 5/8"-9.1 I g 13 5/8"-SM STUDDED TOP 13 5/8"-SM FLANGED BOTTOM ANNULAR BOP. W/(2) '4" JL2 OPERATOR, UPPER CAVITY AND (2) 14" PSLK W/BSTR OPERATOR, Th--/Lrheit SHAFFER LXT 13 5/8"-SM 13-5/8" SM STUDDED TOP LOWER CAVITY 13-5/8" 5M FLANGED BOTTOM 0 0 I I i.1H1LLING CROSS: J 13 5/8"-SM FLANGED TOP 1:1 NIONI .... I 13 13 5/F-51.1 FLANGED BOTTOM IIIIII ! =I . tY1),.(:) - W(2) 3 I/8"-5M SIDE OUTLETS ' iiiiZ9,, • r 33 •__U___ 1 1 KILL UNE: •i •• 'wpmriormi —1 C- 1144.)tk .11 5M 13.-..—2-1/16. 5M X 3-1/8" 511 D.S.A. , - - •11:14.7, py, 3-1/8" FLANGED MANUAL GATE VALVE IMMEI. 3-1/8" SM FLANGED HYDRAUUC GATE VALVE oj''''''-(",",,,173`.•iii. 4..._ :_.... , r., ,,..:, • ----- 1 J__ CHOKE LINE RAM TYPE 80P7 3-1/8" 5M FLANGED MANUAL GATE VALVE SHAFFER LXT SINGLE 13 5/8" SM 13 5/8"-SM STUDDED TOF 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE 13 5/8"- SM FLANGED BOTTOM 3-1/8" 5M FLEX HOSE W/(2) 14" JL2 OPERATOR L-01A PTD Page 10 9/26/2014 • 0 ' its- ._.,/ ,7 - / —Iv— a > L "PAS o - THIS SURVEY 1 c L PAD /�, r ° •r , .,,',\-__H;t. - i � t N VICINITY MAP Z N.T.S. T `t z ■ J I z • jj To44 ao i5 m 7 co ,� mz — N I — '..7m I "T IN Jr J JI-J I - J1:— O OJ J O N N N`,OF'A I�'% $ �E c q _,,e,- ,°°9 i .._0":-°' ° ° ° s*149" .�..* LEGEND fr3CØ'ftb W!!t� AS-BUILT CONDUCTOR Y` o JEETR J. COTTONa MI • EXISITNG WELL RR. .. LS-8306 mer ESSIcoN- NOTES SURVEYOR'S CERTIFICATE I HEREBY CERTIFY THAT I AM 1. DATE OF SURVEY: APRIL 18-19, 2001. PROPERLY REGISTERED AND LICENSED 2. REFERENCE FIELD BOOK: WO-01-13 PAGES 36-47. TO PRACTICE LAND SURVEYING IN 3. ALASKA STATE PLANE COORDINATES ARE ZONE 4, NAD 27. THE STATE OF ALASKA AND THAT GEODETIC POSITIONS ARE NAD 27. THIS PLAT REPRESENTS A SURVEY 4. BASIS OF HORIZONTAL LOCATION IS L—PAD OPERATOR MONUMENTION MADE BY ME OR UNDER MY DIRECT 5. BASIS OF ELEVATION IS NWE RP#1(REF WO-01-05-56). SUPERVISION AND THAT ALL ELEVATIONS ARE BP MSL DATUM. DIMENSIONS AND OTHER DETAILS ARE 6. MEAN PAD SCALE FACTOR IS 0.999907827. CORRECT AS OF APRIL 19, 2001. tit , 1 ,,HE Ail ,EC JJ �P EXPLORATION FR801 MK)L 83-410 bP SHEET: oe„� WOA L—PAD CONDUCTOR AS—BUILTS 'l:ttitil_ �° ' �F ----- I FOR SLOTS S—D,S—LS—N AND Delwi +-24-er SS+JEDFOM INTONATION uC �� �. "— H.TS, i WELLS L-01,109i,110,111i,114,115i & 116 NO. DATE REVISION 6r CMR ..•. -vn . 4110 0 / LOCATED WITHIN PROTRACTED SECTION 34, T. 12 N., R. 11 E., UMIAT MERIDIAN, ALASKA w[LL/SLOT A.S.P. PLANT GEODETIC GEODETIC CELLAR SECTION NUMBER COORDINATES COORDINATES PO3|TlON(DMS) POS|T|ON/O.DD\ BOX ELEV. OFFSETS 5g7806652 gO1gQ2 70^21'00180^ 703500500^ � 34G' FSL WELL L-114 ` ' ' � � 478' ' 583,072.24 5.029.83 -14Qlg'J1.gQ1^ -14g.3255531~ . 3,845' FEL 5,978,070.34 9,819.83 70'21'00.216" 7035�0600` 2,350' FSL SLOT S-D � 47.8' 583.086.:4 5,044.92 -14g�y'3l.5G3^ -149.3254342- 3,830' FEL 50 � 15 0 70'21' `o^ 70.35ver,,,.-- ��+~ ^ ' '~ , 83.115.89 ~~-,m75.00 - ^` -• '30.711" - , •:. ' -51975' ��^~- ��� 3FEL - 5,978,086.04 Q82001 70�1'00 �54^ 7���501011` 2365' FSL wELL L-110 ' . . 482' ' 583,144.73 5.104.90 -14Q1y'2&.8b6^ -14Q.324Q628` 3,772' FEL 5,978,089.96 S82001 70^21'00401^ 70J50�114' � 36S' FSL SLOT S-I ' . . . 481' ' 583.159.38 5.120i07 -14919'29.436" -149.3248433' 3,757' FEL 5,978,093.86 g82008 70'21'00.438" 703501217` 2,372' FSL WELL L-116 ' � � 48.2' 583.173.75 5.135496 -149'19'29.015" -149.3247284^ 3,743' FEL 5,978,097.98 9,820.28 70'21'00.477" 70J501J25` 2,376' FSL WELL L-100i � 479' _ 583,188.27 5.150.06 -140�y'28.58Q, -149.3246081^ 3,728' FEL 53 0r ' Aig„,,,,„, 2,380-t �~�� ^ ' ' '' �*�-�8J.202.O5 �*�-5.l64.87 -1149'28.168" 440.0"-- 3.119�-FEL 5g781lSO4 ' g820 �0 70^2l'00G47~ 7035�17�7^ � JQ� FSL '' WELL L-01 ' ' ' � 487' ' . 583.25598 ' 5,220.14 -149lQ'25.805~ -149.3240569^ ^~ 3.660' FEL ~ ' o�m'� 5,978,119.56 981Q82 70'2l'00080^ 70350188g' 2397' FSL �Lu/ �-N ' . . 88' ' 583.270.56 5.235.13 -14919'26178" -149.3239383' . 3'646' FEL F Robert — p�~ ^u ----- ! � | jj~~ �� �� bD BP EXPLORATION U —' [ - 1. 'NC -_ c ==^=^"=' WOA L-PAD CONDUCTOR CrOn A5 BUL T3 °a' :71;���x � ��� FOR SLOTS S-D. S-|, s-m AND _ SCALE as�vnm �w""� ^p .A/ = WELLS L-un.109'om.nx.n�n� an6 |�� ���� �,� =^. DA IE REVISION 111/ 11110 PARKER 273 BOP STACK RAM TYPE 80P: DUTCH LOCK DOWN FLANGE SHAFFER LxT DOUBLE BOP 13 5/8"-511 I II 13 5/8"-S4 STUDDED TOP 13 5/8"-5M FLANGED BOTTOM W/(2) 14" UL2 OPERATOR, UPPER CAVITY ° ANNULAR BOP: AND (2) 14" PSLK W/BSTR OPERATOR, tli ni n' rte_ SHAFFERM 13 5/8"-5M 13-5/ S LOWER CAVITY13-5/8" 5M STUDDED TOP 0 13-5/8" 5M FLANGED BOTTOM 0 I I DRILUNG CROSS: I 13 5/8"-5M FLANGED TOP II 13 5/8'-5M FLANGED BOTTOM -4,' I W(2) 3 1/8"-5M SIDE OUTLETS• JI IL C� 4}i �}--, c'i 3 II 1 I KILL LINE: ,� �y 2-1/16" 5M FLEX HOSE r ,L v• i ,Pk.,I.. I� .� � n � -2-1/16" SM X 3-1/8" SM D.S.A. 3-1/8" 511 FLANGED MANUAL GATE VALVE C 3-1/8" 511 FLANGED HYDRAUUC GATE VALVE ■�," w oo - ifim■ f I CHOKE LINE: RAM TYPE BOP: 3-1/8' 5M FLANGED MANUAL GATE VALVE SHAFFER LXT SINGLE 13 5/8" 511 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE 13 5/8"-5M STUDDED TOP 13 5/8'- 5M FLANGED BOTTOM 3-1/8" 5M FLEX HOSE 11/(2) 14" UL2 OPERATOR L-01A PTD Page 10 9/25/2014 . ___ • 0 / ', �. uOtrtTOR may ".. 1 '�"{<M= -� 'hi i •iii,, , t.,1 1 , 1 v..si ' > ite ; 14' `/ ial i , .� pi x,, A. —` =1=11=1: t I _mac — i F ty „ i STT - ini -- t_ 4 11 ii .0�= Liii � • ■ 0, ♦ .pv t ■ . i i� j _w 1 I .2, ,Q s 1 ` 20• 4013, OOOOOUIO284O4, ¢R:vAit A13 C907e7tI..-..,. .Yc{Si O:RFw.2 YCGt;Z I fcvmar% 4S1:114it4n -"--Gn10.T.".,....* 1 ...w.w.J wwlwr.areo.t.t trot 0ttamc NRittiC[ .0r111,4*.v.ca umw... ! j i IL an.rawawwr...a. .w www K ! 1 .p7.yp.W .�..aste.wawia,w~irob�w�.(.ams sCsr WIKYQ OY70.02 :. ytp w.2e i .i t21-0-4-6- M TO L.: 1 ._-_... *..sow¢...e.v...<.. nmtctg6 ' 0Yt0Ot i...ec..urot'—" .tea.r.=n.reneaa....w•�r..w. :w%xT<a. SPT[Rwi :MIS.-24V0.19.02 • mw twtoonl nk,rtnaton rrffrcrej on mewom ef1K-0, on F88 t 8 5. 882,8 , r'''s • 5. Ct.:IC,' tt, — 50 75 „ 1:tstt, ; - 4 I eCAMERON 4 1.t.tova. 61. . Prtcoo, •IFS= 41!16"CIW SA NOTES: CHROME TBG&CSG. ""POTENTIAL WELLFEAI FMC MIN REDUCTION TO 3.70"FROM 8627'-9428'CTM ACTUATOR= BAKER C �'� (SCALE 08129107) OKB.ELEV= 76.7' BF.ELEV= KOP= 1100' Max Angle= 36°@ 2535` 1021' H9-5/8"TAM PORT COLLAR Datum MD= 9191' Datum TVD= 8800'SS 2256' —14-1/2"i-ES X Nom.D=3.813" 9-5/8"CSG,40#,L-80 BTC,D=8.835" H 2760' GAS LFT MANCRELS ST MD TVD DEV TYPE VLV LATCH PORT GATE 7"CSG,26#,L-80 BTO-M,.0383 bpf,K)=6.276" H 8279' --X X 6 3227 2999 29 KBG-2 DMY BK 0 11/17/075 3504 3248 24 KBG-2 DMY BK 0 06/19/14 4 5968 5671 1 KBG-2 DMY BK 0 06/19/14 3 7571 7274 1 KBG-2 DMY BK 0 06/19/14 Minimum ID =3.726" @ 8750' 2 8390 8093 8 KBG-2 Dana" BK 0 10/19/97 1 8627 8326 11 KBG-2 DMY BK 0 06/19/14 4-1/2" HES XN NIPPLE 8695' —14-V2"FES X NP,D=3.813" PERFORATION St.MARY g 8706' —17'X 4-112"BKR S-3 PKR,ID=3.875" REF LOG: PEARRAY INDUCTION ANGLE AT TOP PERF: 11°@ 9124' Note:Refer to Production DB for historical perf data SIZE SW INTERVAL Opn/Sqz SHOT SQZ ' 8729' -14-112"FES X NP,D=3.813" 3-3/8" 6 9124-9136 0 12/13/02 2-7/8" 6 9132-9136 0 01/05/10 2-7/8" 6 9142-9152 0 01/05/10 3-3/8" 6 9142-9180 0 12/13/02 2-7/8" 6 9158-9178 0 41/04/10 t , 8750' H4-112"HES XN MP,ID=3.725" 2-7/8" r 6 9180-9210 0 11/14/01 2-7/8" 6 9188-9208 0 01/04/10 2-7/8" 6 9220-9230 0 01/04/10 / '4, 8763' I--4-1/2"YVLEG,ID=4.00" 2-7/8" 6 9220-3240 0 11/14/01 8752' H ELMD TT LOGGED 11/14/01 2-7/8" 6 9252-9262 0 11/14/01 9100' —7"RA TAG 9092'ELM CORRECTED ? FISH-1"OMY GLV w/BK LATCH BELOW 4-1/2"TBG,12.6#,13CR VAM ACE, —{ 8761' III, STA#1 (06/19/14) .0152 bpf,ID=4.00' ? —FISH-Ut'DERREAM ARMS &DEBRIS(09/01/07) PBTD —{ 9428' 444444444* 444.444440 44 .44444 7"CSG,29#,13CR-95 YAM ACE, —{ 9509' X144141 .0371 bpf,D=6.184" DATE REV BY COfvfvENTS DATE REV BY (OMINTS PRUDHOE BAY UNIT 07/01/01 CWKAK ORIGINAL COMPLETION 08/29/07 DMS/GV FISH MN D CHG(SFTY NOTE) WELL: L-01 11/14/01 TMt'YKAK PERFS 09/28/09 SWC/SV GLV C/0(08/03/09) PERMT No: "2010720 12/13/02 CAO/KK ADFERFS 02/02/10 RR YPJC'PEWS(01/04-05/10) AR No: 50-029-23011-00 12/30/02 DAC/KK GLV CORRECTIONS 06/23/14 DLWJM13 GLV C/O&FISH(06/19/14) SEC 34,T12N,R11E,2392'NSI.&3659'WEL 07/07/04 DAV/KAK GLV C/O 07/09/14 PJC UPDATES-FRE PROPOSAL 02/27/06 JRP/PJC GLV C/0 BP Exploration(Alaska) -EWE= 4-1/16"CNV 11110 SA NOTES: CHROME TBG&CSG. "'POTENTIAL VVELLHEAD= FMCMIN ACTUATOR= L-01 Pre-Rig (SCALE 08/29/0ON TO 3.70"FROM 8627'-9428'CTM ) OKB.ELEV= 76.T BF ELEV= KOP= 1100' Max Angle= 36°@ 2535' 1021' -TAM PORT COLLAR Datum ND= 9191' Datum TVD= 8800 SS ' ' 2256' —I4-112"FES X NP,ID=3.813" 9-5/8"CSG,40#,L-80 BTC,ID=8.835" —I 2760' y Minimum ID =3.725" @ 8750' Jet Cut Tubing 3000ft 4-1/2" HES XN NIPPLE GAS LIFT MANDRELS LI ST WD l',1, DEV TYPE VLV LATCH PORT CATE 6 3227 2999 29 KBG-2 DMY BK 0 11/17/07 5 3504 3248 24 KBG-2 DMS' BK 0 06/19/14 TOP Plug #2 6837 MD 4 5968 5671 1 KBG-2 DMY BK 0 06/19/14 650TVDft above TKC4 ` 3 7571 7274 1 KBG-2 DMY BK 0 06/19/14 2 8390 8093 8 KBG-2 DMY BK 0 10/19/97 1 8627 8326 11 KBG-2 DMY BK 0 06/19/14 7"CSG,26#,L-80 BTC-M,.0383 bpf, H 8279' j3C X XO TO 29#,13CR-95 VAM ACE „-8627 ft. Tubing restriction - scale TOP Plug #1 8706 ft I 1"--------- 8695' -14-1/2"HES X NP,D=3.813" PERFORATION SUMMARY REF LOG: FE ARRAY INDUCTION Z . 8706' H7"X 4-1/2"BKR S-3 PKR,D=3-875" ANGLE AT TOP FERE: 11°@ 9124' Note:Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 3-3/8" 6 9124-9136 0 12/13/02 i , 8729' —I4-1/2"HES X NP,ID=3-813" 2-7/8" 6 9132-9136 0 01/05/10 2-7/8" 6 9142-9152 0 01/05/10 I' i 3-3/8" 6 9142-9180 0 12/13/02 2-7/8" 6 9158-9178 0 01/04/10 I t 8750' H4-1/2"HES XN NP,D=3.725" 2-7/8" ' 6 9180-9210 0 11/14/01 2-7/8" 6 9188-9208 0 01/04/10 2-7/8" 6 9220-9230 0 01/04/10 / \ 8763' —I4-1/2"WLEG,ID=4.00" 2-7/8" 6 9220-9240 0 11/14/01 J 2-7/8" 6 9252-9262 0 11/14/01 8752' - I ELMO TT LOGGED 11/14/01 / II 9092' —I RA TAG(EL CORRECTED)? I FISH-1"DMY GLV w/BK LATCH BELOW 4-1/2"TBG,12-6#,13CR VAM ACE 8763' STA#1 (06/19/14) .0152 bpf,ID=3.958" ihr ? —ASH-UNDERREAM ARMS &DEBRIS(09/01/07) PBTD —I 9428' 7"CSG,29#,13CR-95 VAM ACE, —I 9509' .0371 bpf,ID=6.276" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 07/01/01 CWKAK ORIGINAL COMPLETION 08/29/07 DMS/GV FISH/MPI IDCHG(SFTY NOTE) WELL: L-01 11/14/01 TM3+KAK PERES 09/28/09 SWC/SV GLV C/O(08/03/09) PERMT No: "2010720 12/13/02 CAO/KK ADF9RFS 02/02/10 RRD/PJC PERFS(01/04-05/10) AR No: 50-029-23011-00 12/30/02 DAGKK GLV CORRECTIONS 06/23/14 DLWJMD GLV GO&FISH(06/19/14) SEC 34,T12N,R11 E,2392'NSL&3659'WEL 07/07/04 DAV/KAK GLV GO 02/27/06 JRP/PJC GLV GO BP Exploration(Alaska) TREE • SAFE OTES: WE_LFEAD ACTUATOR KB.ELEV= 68.83' -2260' H4-112"HES X NP,D=3.813" BP.BEV= 42.65' KOP= 23300' ' -- ------------ - Max Angle= _"(� 1021' — Tam Port Collar Datum MD= Datum TVD= 8800'SS MLLOUT WINDOW(L-07A) —2709"-—2719' GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 9-5/8"WHIPSTOCK(_/ /_} —2709' 7 3129 2863 9-5/8"CSG,40#,L-80,D=8.835° -H —2760' 6 4100 3469 5 5789 4520 9-5/8"EZSV(_/_/_) 2726' 4 7200 5523 1111 3 8335 6504 2 9500 7458 1 10700 8441 7"TOC-650 ft N D above Schrader NA / ' r--� 4-1/2"HES X NP,D=3.813° ^4227' —10,770' --10,802' —17'X 4-1/2"HES TNT PKR,D=3.870" —10,829' H4-1/2"HES X NP,D=3.813" 1 11--- -10,901 -10,901` H1-1/2"HES XN NP,ID=3.725" 4-112'TBG,12.6#,VT 13CR-85, —I —10,927' ' .0152 bpf,D=3.958" —� 0,911' --I TOP OF4-1/2"LNR 7"X 4-1/2°BKR ZXP PKR H -10927 —10,921' —J4-1/2"WLEG,D=3.958" 7"LNR,26#,VTHC L-80,.0383 bpf,D=6.276" H —11,077 — i „ awl I ►�� Minimum ID = OR a� ' pQ ►� 4-1/2"LNR,12.6#,Hydri 521 13Cr-80,.0152 bpf,D=3.9—{ 14930' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT V' L: L-01 PB2MT No: API No: BP Exploration(Alaska) • • a^ .-O)0 N m N O O N n r M O M M V.- O)n W O N ,Ma-001 V V N Cl, C." ,,,,-NO W m M NO)O N m m v N -N04(004 0 N-M W W N^V O `w C mm r n(0 0,(00N W 0(NNON0 NU)V 0)N- nu)(0N N`Vl 0-00)) W M W M m m M m m[+ml W m W 0 0 0 N W N N M V NO W W W ,.0.0 N m W m m m 00010(0 0(0000 (0(0(000 00(0(0(0 (0(001 m N 4)Nn o vfl (0(1)40(1)11) N t u)N U) m m m m 0 4)4)104)4) 4)4)11) a 0 a 06.4- N-0� p N,co OO (0,NON N 000(0 03 , M C;77, (0(0000 O4Omh 10{0001 a- .. ON664.-6 0Mr0 V N0N-000) N 0' (CNOo0 WM^V^ OW,WW NO 0 nN-N-rtinnr^ N0p00 o00N- ntinr nN-n-n nnnnN2 (-h - -r rnnrN- rNrnr - - -nh \ - - - O 00,000 N 0 N 0(0 003000 01 0,01 0,0) 0,0,0,01 01 0,0,01 N WWWWW MWWWWWMMMM LOW.) 1n N W % O e-.N N NO (00 n M W 00(0N, W M N 0)N<) n a)0)0 0 0-M h C O N0 W Nn NO NO ul m m N-N- ..0.00 00000 MMM,, V V V o c vvvvv avvvv 44444 MMMMM NOL)L)Notri 101)10 P: E a .Fa,,----. Ka1 N-0 ....0 0 0 0 000000 00000 0000 000 000 00 n O 00000 00000 00000OOOoZG OOON OvaVV 44444 66000 00000 000 C. 6! 01 L F E N- - - 00 J -,-J-,-,W upW 00)0) Nn0n000 (0(0V) g ooQmnv= Nm NN ovu,00 a-"-,op CI oOD= 22222 22=22 222 C7 '.'n t0 V V.- 0400o) O NS m N 60 _ n m N N V V Cr Cr • m N J m LJ CO N O mm m V oz 22 6 NIN >">' NC - T 11. M W m r h WNW,_ 00V-0,- M W W W W 050,W,- Oe-M W2 NVOM V-,mrW OhNmV NWhON WVWOr_ Wn - ` O Oe' 0N w -.4 MD mO0 6 m V m 4 46..-:,<, 0 N<^ N0ON OO D>I- Oaa E OM Wpa-a-N MW0Wp NNWWN WANO OONNOW MOMU d N N N O) oLtV MVVVR 41-4r,ONm mmmrm 000aO,- NNMMM V4)W e00 NN NNNNN NNNEo Foo. p o = aNz0 + y d C O 0 O O N O X m m 0%, 0 0 1>ee 0 2 N O 2' Oo) v m O-O N! m O m I-O.-> J m m N v 0 0 v O v r W N V NO M, ,W,-0,0 N W N n M N0 V O z- m,n r O m m r r e- W V m m 0 W O O N W V,W O, n V M r-Ntj Nm('7 OrrON ONm0,7 NO 0,i N(jh nNO 00bhn (V OA O O G q.41.1.n.0 N N N V o h W W W 0 M W W O)N M J 2ND tO r n N1D O)O)O 00000 O e- C 151 a •• 0,i L C • a a c fi o rn 2 m n °n o V 12..- •c m2 > oy -o 0 0 0C g O wr E. 0 ..27.13 m 00 - W U C O O e 0 . 52s •C Y E I E C V E2 p O F m.pN N 0mmNo 0,-.`"-.NW^MMNl N M W O W V On M Te ) O C C > m r e O O.0 0 m m^ m vNN,N mmm0r` mNtn RNO 00,0M NV W W W W h6e- -7:-C'V m' _ O)O)N V V n R b N N 0,i O[V O to to ` 0 W O I o C O O O.i >� p > m h m m r m'9 T V W 0,-,.,-T R N,,-N O N,-,.001 NA NV O.)) WNW W ,W D m f e 0 2 0 e C G O - ^NNN NNNNN NNN O y C m u u K KC ; ^ C C L U U a (0 C Y o O o a.•, Ns a u aC'o$ a .: W W W W W W W W W W W W W ~ ,-vNmNTm,-mawtmv 00,onO ObM.-O 4)0 mA m OWWOf\ ^ V MNW N o 13 NnW4) Wr0mWWTO WWOO NNNN MVVNNNNN NNNNN NNNNM MMMVV VVVVV VVV pLa IwL a M SII m- o v,,, m N m.o 0 0 m m o 0 0 0 0 0 0 0 0 0 0 0 0 0 x 0 0 0 0 0 0 0 0 0 0 0 0 Q O (>- 0 Nj O O D V O O ryUM O V Vmmm 64-64 mNmO0 om, , N,, MMM NNNNN1mmmMNM0 VOVNNNN N N0NNN M VVVV O ommi t_ J um m MoD V 0 = OM M mV . ,,, o• N m `... ,,.-.-n n ll,,-m O^) O V(0 m m Of O,O)q OI O)t7)of O)W Of W Of w (4N7�.)00 00000 04041.) g - x 0 6 M MMM m M N N-, x,0 0 0 00000 00000 000 ¢ o N f N y N N v Q 0ii. = a w v v,m d vi e N C N M N) y 0,z ..-r N 0) 0.'-0a-- m{p N O m h h h h h 4)h NO 4)h h NO h O O v 0 E.-. 0.0,W0 O.-M r h NVOMN NNNNN NNNNN N N N N ›••v- a- W Ol m V NOp:vvm mt`O),-N 44,60i NNNNN NNNNN NNN N0 .60 0 QO n M M M M M M M M V, (0(001010 04'3,0,00 W W W W W W W W N m4 QOm 0- <o m0 4 amata" E o - N E NN 4o mMo t0 -'il N ¢ a .- o , m 0,L20. 9050 .,_ < mmci cinnzzooN^.i 3 O Kom0000000000r ^� q Vhhv^N ,-nN o, ohW NDN000 100000 0N0006 M,060 )060,60 MND E O V W O N V 0 0 0 O 0000, N V V N-W N n W n N MGe mmNN N-m000 NMM WM0WO NMMM VW,NNNNN NNNMM MMMMM MVVVNO WOOOO 004)A T Q W CI) e O n C C O} Y 0 W e C W e,,-- .. 5.2Ja 2 j Ot N / Oq E .- OACCLL e T UO0, cu . .02-10° 013. SZ n o ` oE _ L NO 0 ` eeY r TOQvOOcpmOC OE co L6. O0Zet ¢ ' O.O.OUZZZZ 00 c '-0,oo- =- ii t 2z o 0qN;o L E nn v .00 M -zI I I zI 2II I 07103.0] _ C.0 ill III Oy o U 00 V 0)M W m0NU) 4N.-.W CON‘-(90,-(90, VU C')W1-...4.N(0,- MN.-V m(0,-00 MN,-o-N 0V 0 M C= ^ N M.-O W07 W mmW W V U).41640 N M W W V NN N070 N bNb0 0,,e-o0 UQ W d .0)N•" b 0MN 0 �p N 66,-,-M 46666 MNW 0 r MN V 00) 61C1h.- 1')f')1t)R) 1'0110)00) O W)0Uj V NO)0)00 O U)U)0) N W 0) O'Mmp W M 0)U)C (DO - ONM V M MNNm0 U)Nm.-O) 0,100(0 0 V V V V V 07,00 001,-0 0 0) V V W W W W N 0 W m mm m 00660 00099 m m 00N NN0)0 b W b 0 W (Ob W 1010 10 W10�} 0) W U) W (0)0(0)0)0 W W W W W 66606 NNNNM Nn N(U b b UUU (001000 b 0UO UO W OO b W(0 W (00 0 0 O) 0) 0 66666 ..... WWW1pW ..... WW660 66666 00000 66666 00W0W 69266 (0 U) U) w)6.....) WU)U)U)U) W W W W W ..... W W W W W 10 0101010 W W W W W W W 10 10 U) W W W W W W W W W O. 2 0 0)N^ W N 010NN.- m W U)OO ...r,,- V NNNN 01,-.000 V-100 N0bN V O0NNO MON V N m W pN M C O N 01')00Nm ,-W N0N (0,-..0,0N a W NN7 N W OON 000 V 0 M0,00 0 00 0 W M.-0 00,-NV 0,-NV N W N V VY00)n^ MWU .rON00M0W W0m00)� N000* N0^ MN00N0V K Co0 0V ) O ,- UW 000MW Vm . 0 0) U0n 00O00)U0 N00 ,-VN VO mm m0WW0 000WW WWWpm 000 NNNNN ^0) 0mmmm0000001 Z bb N N bbWWb WWWWW WWWbW NNNNN NN ^ 0000 00)00 m000NNNNM 111 NNNNM NNNNM NNNNM NNNNM NNNNM NNNN NNNNM NNNN 0Nmm mmmmm OOmmm 6m0)96 OmmWOmmmm m ) )mm mmO)mm mmmO)0 690) 6 a)mmm 1fb W WWWWW1011W WWW.. WWWWW UWWWW WU0U0010 WWWW WW..W WWbUb .• 0.) N N O) T. K b N 0 m N W N 6666,- M W W 0)O N V W O m00000 N NN V 00N0,- No-3,00 W N O m M ,--'-,-N W N O COV V V V W U)0 W WWWN NNNN W 00000 0 0)O)010) COMMOO 00000 00000 00 .'N O C U) Uj 11)U)W W U) ..... W N U)U)U) 66666 N W t0 U)U) UU U)U)10(0 1010101010 66666 66666 6666 G k E 0 we O 0 00000 00000 00000 00000 00000 00000 00000 00000 00000 0000 J. 0 0 00 0 W U) U"),,,././.1 W W W W W W W W W W W W 0 0 0 00000 00000 0.000 0 0 0 0 0 00.00 0 0 0 O O O O Q' 44444 V V V a V V 4 4 V R 4 V 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U ^ m Co 70J.J -1-1-1-1-1-1-1-1-1--1-1-1-1--1-1-1--1-1-1-1-1 -,-,-,--J-, J J J J J Jocn nn000 / ( 00 � 70)( (/ -1 -J-J-1-J-, J • J J~ _ _ 2mNJNW0 .NNV CN ` NJW^R OV- NOMM WIZZZ ZZZZZ2222_ = 2= 0V 0 ^N mVV^ N N0mNV VW7VV ,- 9 MWWU0MWV N 7M MNN r4M mm to N N UMDWNN0OV NN O00UNN '^W 0, OO.N �m M00ONO) N-1O0 0NN ) ONO00 N0N 0OW VO•- M00W N M MO N6 V M00mV MWU)0m W V NMM co 6000 co 6464 .-OD4 N mOOON 66.4166 11)O, -U)0 N M0WN07 mWN0 mMNO0 MUWNN <0WbN.- 00MbV ONMMN Ommm mmNMM pWN. aNin NMNMMMMMNM MMMMMNNN 000WUWVV NNM MNMNM NNNN mm,-NN M NMMMMN 0070 ONMNM NNM MMMMd 0 Z 0'rag. 0j co N Om)1�1`)^ ....N,-V 1A 1nU^n .6'4'6,1'0700010)0 Mb 00 V b0 mNM.-m V 000)N OOp 00)0 ^W 0 N Q M 0 b N N O V O N m V O O 0 0 0 0 V N M V N N V N V 0 N 0 O)M W O) N:6466 U)U)O p)0 O0 N V N UD N.-N 0 M N 6 U)0'1 0) 6666.41 O)O O 6)- .644. 0 W U)N O ' co 00)W N N 6006. W V N 0 m U)' N N N N m U)m 0 M O V'- N N N U O O) M000,- N N M M N0,00 J N N N N NNN N N0101,-,- ,-,-000) m 0)0 N(O YJ Q N e- 0)V 0 0 b N 0 0 000 00090 0(0 0 0 . . ' . 1 1 1 1 1 ' ' 1 1 1 1 1 1 1 ' C 0 J_ 6 OE W O „,,,,-0N 0 .0.-0 N V N N 0 W O N N W 0000N- 0 N N O N 04090* b V N W W 0030,001 N000 a. W N N b N0 V M W 0 1- 0•00 V W W NMN W N W M C V W M UO N 0� N O U)O N M W m V N * *N-0 ,._.m1.0 (0 ' N 100 M V 0 66466 0 V NN-N .6.-:N:6 400 -C'-1') 0)6000 of NU]NNS *COO)01 NU)'-4 V '-NO)�- co (N0 W 0 N0 W,-W V Nom O.-06N W V V bm W 0)NMO NN.-ON U)N04 0NC'--.- N V Nb Q m m 0.-V V V W W 0 N N 00000 00000 000 N N 0 U)W M N "0005 90990 09000 N N N b N N M M U?9? c7 M 9 M 17 99999 99999 O)T 0y 07 1? 07 c'r 0ti tti 07 '7'7'." N N 0u N N 1V (V[V N N N N N N N 0 C D • ( 000066,..1 U 0N- U6,-66`. OO '-N W 00000 (0010U)W UOUO M N W W )N W M0 W >` 1O 00 )006 )10 U10nON 000 bb00 bW0Nq .b11bm 0n00 O NO [j O m NN O U) U0) 0UAN* *0000 06U)N h Oco W Om UOm M0 W0CNNNO NWV N,-0003 MN NaMN� NNNN0M0q0WU) 000 0 o.-.-Nm VW000 N0M0.- NNV1 ^O) 1ON- V )UO UN N000) O0 0 V V ***t* W W W W W W W W W W W W W W W 0 010 b b ICT,,,,,, 00000 00000 00000 0002 0 J M w� 0O0004,00 O O ‘0001•-N 0 N o 0 m0 M• 00000 00000 000 000000000,-.M O N O0 N0-N 0 00MUM , 0 O U) N U)0 U)W C'- 66N.-4 0N000 W t00 UlMm M00Uj0 OO U)0)U) 40 U)O)- 66646 N000)m a NU)O M N W O Wm N000* N'-0,...0, O N W W M N V 0 N W W M N M V *90040 u.“M,,,,..0 W 0 V 0 0 V W N., V V W b W W M 000`-N M V W 0 W O N W M O V (00000 0)O M V V U)W b 0 W (00N-00 0000) V V V V V V V V W W W W W W W t0 W W W W W W W W 0 0 0 b O N N N N-0000 00000 00000 0000 •r mm 9900N W V O M W W W N M V,-N00,- 00000 00000 00000 00000 N W W C'--.- O 0',.., 2- (00 00)0)00 (O V NC'-N 0(000)00 N0000 00000 00000 00000 W NN-W V b NNO I- N 07 Mo)MO6 NN m MUD 6,-.16NNMU) 0000000 00100000 0000000 000,00 (O0')NNN N V N 0 0 00000) m m 0 O N 000 W MN,- W 4-.4 V V V V..1-',F V V V V V V V V V V V V V MNN O E M NMM NN 0)N MMM N07 MMM M MMM M MM MMM N NNN 4 O ) W UO b W N N V N O W O M N-N V m N V 0 W 00000 00000 00000 00000 V U)N b W 0043.) C "" N N N N V 0•.N W N N 00)N W'-V M W M 0 0 0 0 00000 00000 00000 W 0M M V V010,- 6 o 66N000 W N00U)N 666.46 )0N-m� 'UU)U)U)UU U)U)U)U)U) *0)0)0$0) 0 W U)UjUI .00N66 Uj 0000 W W 0 U)W V V V V MMM 6.1.1.1.1 N N N N M MMU7MU 7 O 7 O 7170 7 0 7 0 7 07171707 U 7MMMM MM V 0 W 0.000 0E- M N W b NON 00066 OOONO 00000 O M M 0 bC' 0 0 0 0 99000 0 U 7 W W M 20,262 N O N M a... N6 m,.-0,,, O O O O O 0 0 0 0 O O O O O O O U)O h N V W C'.-co M M N 4N W 000 ,-.04,...,-, 0 R@ V O 0 e1..006 00000 000„0 00000 00er;0) 6666K 1010) 66NN0 64006 (66140 m W 0)b NON 00000 O O O N 0 00000 O N V O m V b O N W NC'-(000 b N N N m O N 0 O)O U)O,m NM 0)p V 110 W N000 .-NM)V W W N 00 0000707 mmo-NO N V N00 M0000 NNN MVV, 00 100 000 (0000N- NNNNM NNNNM 00000 00999 00000 0' ,-C' ' . 0 M V O N N N 0) m0 arn 0 0 0 EWm,- m m 1() 2 0 N M f7 O), a 0) 00.. 00V 0N0p V � ..,.0 0 y; a c E I I I I N � -NU m-)9NL W OU�m Q`-QU = '� Q ZZ — o mm m m a z c,-- -- .—, »> m> >617, 2 ti W Co W v 0 co.)... 17(70 0 0 wNN-N NN1.NN N1-NL.N NHNN0 )- N- N v v 0 III AD M M(000 0 0n-tO n)M MOmm 0 N-im U) 1,,,,l-m,. OM C w W tv)MN oO ?.-V N a MO p t�try�t m 000N-0 0 V MNO Me}7�0) OM O .. ._ ,0 0N000oo0 06,6.-66 a oa O (606.66M V Nto CM+) NNN 0�Vp �0 (0000NN OpNC.- N m M m `" V mMNN,- 00 MCO,v-O OO7mrQ 0 Q V V V VM't V vf0 00 OI W 10 {01010(010 tpt0t0mO UU)mmm U)**c m m m m m m 00000 00 m m m 00 m m m 0 0 0 00 m m(0 m m mm co N U)m m to U) U),N u)10 U)U)to to U) U)U U)N N U) 100 U)U U)Nom U)U) N o a 2 Q 0 O^ N ,-N M o 0 m M 0 0 0 M M o N N O.r N 0 V M m 0 M a a„u) 00 N CWV N-mmo- o OOto r s-s-t00)f7 OD,-t0 U)U) O ON-ON- t7U)Mao. ow 2 g tt00taK6 CU)(0d W *n)N-t0,- N.0 r N N N OMr N.<4,,0 (0 O •,0„4 ort--mm NM0N N V(0O U) m r V N0N0 U)V O N NNM0)M M M MOO M V V,M0 mmN0(0(0 (0 ,,ODM Op0t)m m a a 00 O)a0)00 00 a 0)0 at O)a 0000 a a a 000 Op Opp 00 Z r r r r r r r r r r r 1,-,,,, r r r r r r r r r r (0 m m m m m m 0 0) 00000 00000 00000 00000 0 0000 00000 a s N U) U)U)U)t)U) U)U)U7 Nn U) U)U)1U)U)U) In U)N N U) U7 m U m U) m In m U)U) U)U) U) N tT • X 0 N M(0r 0 N M C@(0 r m p t 0 T t�Op m O N M V U)r a O N N M N o m 00 C o N NNNN 0) 0)M Mt,)M (0M n)•}V V V U)U)U) N ,U)No0 0t00 toto N N O C tO t0 10 tU tp t0 t0 10 tO t0 t0 tO tO t0 t0(0 (0t0 t0(0t0 tO m m m m tO _ td to td t0 (0 ro O▪4 O u 0 0 W= 0 00000 00000 00000 00000 0 0 0 0 0 00000 00 J o 0 00000 00000 0.0.000. 00000 0 0 0 0 0 00000 00 • 00 ,- ,-t0O 666 60 (06666 m m m(0t0 t0t0 t0dm 00 • F.'_. OJ) 000001 OJ)(0 0 N-nn r COwcoco M' W W 2'0_'0_' d' 2W W W 2'rctocoo m xmoOM (0 NmotNu) N10Mmo u)=22 m �r°�UU),to °) •-o0UN) Op=22 I 000M - d 0 ad a d 0�,�N N t mto tto 0 0 000 O) . to t0R M 0)0)0)0)0) M MU)T U) U) 0 0 a s O coma mm) CU)0 V m O 4.040000 M O M 00000 W0000 ^ 0Nr mM (00 m V M V nrN V 0,00 0 rN10M 0rMaa MN N )p . U0N M(0mrm (0rNVOW p V N O D m N m co M m N V m N• n)(V)Ne.tt) tO n)ama NtO tO^M COO(0O t0 N- 0)0) Cdt t0 V a0) N r 0p o) 0000n N 0ttOR mn N-0 U)V R n0) M N'-.- 0000N (0(0 M n)M Mn)N N NNN N NNN,-.- ..... •-•-,-,- ,-,- a Q O J_ N U) V"-m,- )r m -(0 . O V a.•}r U1 V Mr 0 0 V (0 00 rmt0m NM 0000 Q 2 m tV,-7 M O r M M t O.- (DO).- o0 N0'V 0 O U)O O V 007 r0) t O W Y V mm0 R ,0,M, Or mty 0 66460 N(OtOU V N-0O) V a N-tt . Nn 0't m O U) 00000 NNNQU or-moos 0OMNN t0 (0 V•-a 0000)t� MN C(0O00 J O p,- ,- NNNNN NNN0M M V V V N U) 00rr 000,011 rm N(0 V .- '- '-,- r ,-NN NN Ym0000 2 Zr r r m N to)UU,UU, 0 J_ U V toUM,-.0 rOMefN ONN0iN- ^r.-ONm tO MOON)O NN(0U)U) a W� M m0301.-V mm0Q.tD N N m V V m t00D W m n m m N m er 0a.4 V rN, O•- O'.-'N u) (0(0(00 NN-V us NU) A A V. NN ,•-m,,,- p N ,-0 00Oc?‘?"."--"--NM N 4.M NN ,- OnN 009 N) Wt?Y N • N NNNN N NNN N NN,- i t t t O C • D r M 0M0N tom Nto m V Nt0t0t (0010(0a to a(0*U) (0{0(Ntot0 (00 T a 0000* C a mtOO (Nm m N 0MMM, (0 Or a mNmm 10 6 m 0 d U7 m..V d M No m Nrd 0)M Nr V(O O ON00 Opj(0d0 mm 0 nam-,4 0 0 0 0 0 0 0 0 0 0 CO 0 0 0 M M N 0 0 0 0 0 0 0 0 0 NM o 0 00000 00000 000{0 m 0 00000 0 0000 00000 00 0 m0,0.,0 Q O) mm (0(0(00 as L a 2 a` ON p O m..r p V r 0 0 a r p p(0 M(0 M V O N1.1-N-0 'p(0p 0 OW H= M p N m V m 0C' ' 00 O V O O m 0N0 '- O N,-COM U)p U)p p OM O ,- U)0 Nnjm u)mrd n) r.-u)e}r ONOmt0 U) mr0 n)apOI)d 00) CO O0000jOVi OMj ONi ONi p)O 000OVO OMD 00000 m mmmm 00(00(0) MM m 00000 00000 OO m m m 00000 m m m m m 0(0000 m m 2 D W .-2 2 err, O V 10mr O V Or(0 (0,- •- MOrMO O anon 0NNN NN W D W` O orNmO mNOo04 MN-,, NN,-00 0 Oa(0 , Np(OtDo LOU) Z,-Wm-- F -W,-F r 0 0{0 0 {00 N ON NN-N- m 0 N h Om 0 10 0 0 (0 t0 N,-'-•- O mamma 0mm0(0 rr-rr r0a0O 0 0,-•-01 MMnnMM _W•-WEM MMNNN NNNNN NNNNN NNNNM COMMMM M0Mtiy MM F C N N N -J F- W M V M J M J m W J W ▪ ^ m ,001000 (N OU M N10m 10 0 a(0O N V 0000M (0NMM 0 MM OOW W W , .-- ,t n aU)p 0 N t O O U)0 00p p 0 aM r O M 0 V V MM Mt)tOmm COM 0,_W, (0 n^mpr 0{0000 000 n M NN•-,-0 O 0000 000(:(0 44 Aram O)a o 0000 aam m a 00000 CO mm(0(0 mmmm m m m NU)a J M N N M-1-1-1 N C Cl)Nn N W W W fl' M r m O m ..M a(0 N co),-coo 000 Z O ',004,0 OOm O ,00..0p0 OOOO O0m`)0 00000 1, 0000 O0 mm m 00 G C aJ _. 0 . N mm O 0,4N 00 SI o= O N-O O d O p 0 V O)O 000 N o r 00000 t dada O t O O t 0 t O O O t 0 N O)m O ,00N0 r O o m O O(0 m m m 00000 V O O o 0 O p m a M M '0 U) ^10 0 ^ N m m mamma a O N m a O N M V V 00,03 a O)a N m m Y a O S ('40(0)0)04 M m M M M M M M M M M ono, 44 o m ���•r r .- •- 0 0 • q Vi 0 V 0 J r N N U m0 2 O 2 0 E U a N U o U * a U C 0 COOF- W R 0 • by scmmompor Borehole: Well: Field: Structure: L-01A(P8) L-01 Prudhoe Bay Unit-WOA L-PAD Gravity 7.Magnetic Parameters Surface Location NAD27 Alaska State Plane,Zone 04,US Feet Miscellaneous Model: BGGM 2014 Dip:80.975° Date: 31-Dec-2014 Lat: N 7021 0.65 Northing: 5s976h1606 Grid Cony: 0.6366° Slot: L-01 TVD Ref: Rotary Table(95.65ft above MSL) MagDec:19.235° FS: 57583.189nT Gravity FS: 1002.002mgn(9.80665 Based) Lon: W 149 19 28.60 Fasting: 583255.980US Scale Fact: 0.99990787 Plan:L-01411.8) -5000 -4000 -3000 -2000 -1000 0 1000 RTE 19 MD 0 0 1000 1000 2000 s 2000 2648 MD Top Whipstock 2710 MD • _ e Whipstock SVi(25ao.6 ivri) Bas .27 "_.._.._.._.._.._.:_.._.._.._.._.._.._.._.._.._:._.._.._.._.._.._.._.._.._.._.._.._.._.._.._ 2'696 _._. _.._.._.._..___.._.._.._.._.._.._.._.._.._.:_.._.._ Cry 4/100 2748 MD 3000 33799 mo 3000 UG3(3200.65 TVD).._.._.._.._.._.._._.._.._.._.._.._.._.._.._.._:._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.. _. _.._ _.._.._.._.._.._.._.._.._.._.._.._.._....._.._.._.._.._:._.._.._.._.._.._.._.._.._..�.._.. ._.._.._.._.._.._..__.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._..�.._.._.._.._ 11G1(3660.65 TVD) 4000 _.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.. _.._.._.._.._.._.._.._.._.._. .._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._ 4000 frig 4070.651V F Fau81 11.0 N USO�1Y�._.._.._.._..-.._.._.._.._.._SB6Hl1a.._.._:._.._.. ---._..:..8420 MD -.._.._.._..:..-._.:..:..:.._..-..-.._.....---..-..-..-.._.._.._ :-:_:..:..:..:..:..:..:::-_..:.._..:.._.._.._.:..:..:..:..: W _ se tdeb Bf TVA-� o F 5000 cMz(a97B.eBiV'lii"'" 5000 0 .............. ....-..-..-..-..-..-..- End Dv 6000 8021 MD .. ... .......... 6000 11(C4.(6645 65 T/D)._.._.._.._.._.._.._..__ T(BI LCU(6705.66 TVD)_.._.._.._.._.._.._.._...._.._.._.._.._..Fi 2_..___..___.._.._.._.._.._.._.._.._.._.._.._...._..e.._.._.._.._.._.._.._.._.._..r.-_.._.._.._.._.._.._.._.._.._ 8101 MD 7000 71.1L,(0325 65 IVO) 7000 T(rrc 7i63o.6s.N155.._.._.._.._.._.._.:_.._.._.._.._.._...._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._...._...._.._.._.._.._.._.._.._.._..:.._.._.._.._.._.._.._.._.._.:_.._.._ eirMSY- 8000 ._. : :: 8000 TJE(9039-85 ND) _.... ._:._.._..-Eautl.._.._.._.._.._.._.._.._.._.._.._.._._.._....._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.._.�_.._.._ (0iti_g rv.Di_. _._.._.._.._.. ice=MO r.tc(us).85TV6}'_. JS i�s5zbs3:v'._.._.._.- -._---.2On:s!(C::_::_::_: ::- }J�R�(878g4�5�85aNy{Dj)�q .•_•. •..... .11071 MD 11904190 12187190 T8H0(e/i5.gRai 9000 9000 1/ Cry t1/190 11091913 90• L-01 cry WOO End Cry 11728 MD 1399990 T912 13980 L-01A(P8) 13449MD -5000 -4000 -3000 -2000 -1000 0 1000 Vertical Section(ft)Azim=290°Scale=1:500(ft)Origin=ON/-S,OE/-W • 0 U Ct 2 i c9 o Nr CV 0 o9 o , . Tto g , m - & gli !r vr Ca wo / . e co 11 � § k - . o ) F § 3\ # I / _` P = 2 § | - ° CO ° � FT-- CD ` V; r. / _ 13 tr. u / �� ? -; IL 2 A \ IL / / IEm !; § / \ § ii -o - 0 / cv • © .; II .92 . t 4 _ �! { 23 J ] ] § - f \ § \ : § \ e2 - 9 3z ~ ) ! ) � / � . .- s- S. f § _ r » ft / e- CO k : i0 , ! : _ _ ` ,IL i CO ao a el co « . . . o e . & ! . . o . IN JCV ,_ § , ' , . k § % 8 O• 3 ! ! • • • 0 0 N CO- - u) N - M - O in I _ 73 - U, O. .. N 0 - O 0 _ 07 - N O _ CO - O N ) Io N C.,O—OC) C_NNm O N Lf)O a) N--- N CV a)_ NOOO)_ Nnm_ N- O_ N- toNODNa) _ M U _ Oo r_ ,. Q _ CO O CID Q J I _ mas o oo_ II _c J r n 7mOa Cas N.N ao_JOO k - u-9_ I, U.N.= d C o��-'a) - N N S 0_ 0 to N N II I I I I I I I I I I I I I I I I I I I I I I I I IIIII I I I I I I I C I I I I i I I I I I I I I I I I &I I I I i I I O N O to O N O N O to O too N N.. co co to 1n V co M N N r (ui/usn 01.) uoi}eiedeS ague°of as;ue° 11111 III BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well L-01 Project: Prudhoe Bay TVD Reference: L-01 A Plan P273 @ 95.65usft(P273 plan) Reference Site: PB L Pad MD Reference: L-01A Plan P273 @ 95.65usft(P273 plan) Site Error: 0.00usft North Reference: True Reference Well: L-01 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore Plan L-01 A Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan#8 L-01A current Offset TVD Reference: Offset Datum Reference Plan#8 L-01A current Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Interpolation Method: MD Interval 5.00usft Error Model: ISCWSA Depth Range: 2,647.90 to 14,930.07usft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,688.31 usft Error Surface: Elliptical Conic Survey Tool Program Date 9/25/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 128.61 2,647.90 L-01 Srvy 1 MWD+IFR+MS(L-01) MVVD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 2,647.90 2,710.00 Plan#8 L-01A current(Plan L-01A) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 2,710.00 3,000.00 Plan#8 L-01Acurrent(Plan L-01A) INC+TREND Inclinometer+known azi trend 3,000.00 4,500.00 Plan#8 L-01 A current(Plan L-01 A) MWD MWD-Standard 3,000.00 11,070.00 Plan#8 L-01A current(Plan L-01A) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 11,070.00 12,570.00 Plan#8 L-01Acurrent(Plan L-01A) MWD MWD-Standard 11,070.00 14,930.07 Plan#8 L-01 A current(Plan L-01A) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 9/25/2014 11:31:57AM Page 2 of 5 COMPASS 5000.1 Build 61 • BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well L-01 Project: Prudhoe Bay TVD Reference: L-01A Plan P273 @ 95.65usft(P273 plan) Reference Site: PB L Pad MD Reference: L-01A Plan P273 @ 95.65usft(P273 plan) Site Error: 0.O0usft North Reference: True Reference Well: L-01 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore Plan L-01A Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan#8 L-01A current Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB L Pad L-01-L-01-L-01 3,031.03 3,020.00 47.45 212.52 -93.62 FAIL-Major Risk L-02-L-02-L-02 2,647.90 3,550.00 1,684.91 48.44 1,646.81 Pass-Major Risk L-02-L-02A-L-02A Out of range L-02-L-02APB1-L-02APB1 Out of range L-02-L-02PB1-L-02PB1 2,647.90 3,550.00 1,684.91 48.44 1,646.81 Pass-Major Risk L-03-L-03-L-03 3,097.00 3,135.00 754.45 292.48 462.04 Pass-Major Risk L-04-L-04-L-04 10,874.45 11,960.00 856.85 320.54 539.28 Pass-Major Risk L-101-L-101-L-101 2,649.76 3,365.00 1,524.54 53.26 1,475.61 Pass-Major Risk L-102-L-102-L-102 3,103.64 2,915.00 1,189.14 297.76 926.31 Pass-Major Risk L-102-L-102PB1-L-102PB1 3,094.08 2,865.00 1,216.35 296.10 951.55 Pass-Major Risk L-102-L-102PB2-L-102PB2 3,114.13 2,905.00 1,241.40 296.19 970.59 Pass-Major Risk L-103-L-103-L-103 3,101.86 3,325.00 1,527.70 291.44 1,236.86 Pass-Major Risk L-104-L-104-L-104 3,097.32 2,970.00 695.88 292.23 418.90 Pass-Major Risk L-105-L-105-L-105 8,190.94 7,600.00 384.77 324.85 60.17 Pass-Major Risk L-106-L-106-L-106 3,095.96 3,240.00 910.71 281.80 667.16 Pass-Major Risk L-107-L-107-L-107 2,649.34 2,580.00 298.66 56.80 253.34 Pass-Major Risk L-108-L-108-L-108 3,148.38 3,275.00 259.29 286.42 142.48 Pass-Major Risk L-109-L-109-L-109 2,650.00 2,740.00 483.07 49.64 433.67 Pass-Major Risk L-110-L-110-L-110 2,650.27 2,970.00 972.85 52.58 921.62 Pass-Major Risk L-111-L-111-L-111 Out of range L-114-L-114-L-114 Out of range L-114-L-114A-L-114A Out of range L-115-L-115-L-115 Out of range L-115-L-115A-L-115A Plan#1 Out of range L-116-L-116-L-116 Out of range L-118-L-118-L-118 Out of range L-119-L-119-L-119 Out of range L-120-L-120-L-120 3,110.48 3,220.00 1,536.76 291.68 1,245.24 Pass-Major Risk L-121-L-121-L-121 Out of range L-121-L-121 A-L-121 A Out of range L-201-L-201-L-201 Out of range L-201-L-201 L1-L-201 L1 Out of range L-201-L-201 L1 PB1-L-201 L1 PB1 Out of range L-201-L-201 L2-L-201 L2 Out of range L-201-L-201 L3-L-201 L3 Out of range L-201-L-201 L3PB1-L-201 L3PB1 Out of range L-201-L-201 P61-L-201 PB1 Out of range L-201-L-201 PB2-L-201 PB2 Out of range L-202-L-202-L-202 Out of range L-202-L-202L1-L-202L1 Out of range L-202-L-202L2-L-202L2 Out of range L-202-L-202L3-L-202L3 Out of range L-203-L-203-L-203 Out of range L-203-L-203-Plan#11 temp Out of range L-203-L-203L1-L-203L1 Out of range L-203-L-203L2-L-203L2 Out of range L-203-L-203L2-01-L-203L2-01 Out of range L-203-L-203L3-L-203L3 Out of range L-203-L-203L3PB1-L-203L3PB1 Out of range L-203-L-203L3PB2-L-203L3PB2 Out of range L-203-L-203L4-L-203L4 Out of range L-204-L-204-L-204 3,103.31 2,860.00 966.75 297.47 719.40 Pass-Major Risk L-204-L-204L1-L-204L1 3,103.31 2,860.00 966.75 297.47 719.40 Pass-Major Risk 9/25/2014 1131:57AM Page 3 of 5 COMPASS 5000.1 Build 61 • . BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well L-01 Project: Prudhoe Bay TVD Reference: L-01 A Plan P273 @ 95.65usft(P273 plan) Reference Site: PB L Pad MD Reference: L-01 A Plan P273 @ 95.65usft(P273 plan) Site Error: 0.00usft North Reference: True Reference Well: L-01 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore Plan L-01A Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan#8 L-01 A current Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB L Pad L-204-L-204L2-L-204L2 3,103.31 2,860.00 966.75 297.48 719.40 Pass-Major Risk L-204-L-204L3-L-204L3 3,103.31 2,860.00 966.75 297.48 719.40 Pass-Major Risk L-204-L-204L4-L-204L4 3,103.31 2,860.00 966.75 297.63 719.24 Pass-Major Risk L-205-L-205-L-205 Out of range L-205-L-205L1-L-205L1 Out of range L-205-L-205L2-L-205L2 Out of range L-205-L-205L3-L-205L3 Out of range L-205-L-205L4-L-205L4 Out of range L-205-L-205L5-L-205L5 Out of range L-205-L-205PB1-L-205PB1 Out of range L-210-L-210-L-210 Out of range L-210-L-210PB1-L-210PB1 Out of range L-213-L-213-L-213 6,800.00 6,725.00 596.28 348.87 499.92 Pass-Major Risk L-214-L-214-L-214 3,105.92 2,870.00 1,415.88 300.23 1,158.01 Pass-Major Risk L-214-L-214A-L-214A 3,105.92 2,870.00 1,415.88 300.29 1,157.98 Pass-Major Risk L-215-L-215-L-215 Out of range L-215-L-215PB2-L-215PB2 Out of range L-216-L-216-L-216 Out of range L-219-L-219-L-219 Out of range L-220-L-220-L-220 2,647.90 2,715.00 711.17 58.83 662.30 Pass-Major Risk L-221-L-221-L-221 2,648.59 2,730.00 291.77 51.51 240.98 Pass-Major Risk L-222-L-222-L-222 3,116.39 3,025.00 1,311.87 292.99 1,021.79 Pass-Major Risk L-223-L-223-L-223 Out of range L-250-L-250-L-250 Out of range L-250-L-250L1-L-250L1 Out of range L-250-L-250L2-L-250L2 Out of range L-50-L-50-L-50 2,649.75 2,995.00 874.80 40.74 839.21 Pass-Major Risk L-50-L-50PB1-L-5OPB1 2,649.75 2,995.00 874.80 40.74 839.21 Pass-Major Risk L-51-L-51-L-51 2,647.90 3,095.00 1,045.13 42.14 1,008.62 Pass-Major Risk Plan L-206(S111-60)-Plan L-206 OBa-Plan#20 2,649.30 2,940.00 638.48 44.83 601.23 Pass-Major Risk Plan L-224(S-E)-Plan L-224A-Plan#3 L-224A Out of range 9/25/2014 11:31:57AM Page 4 of 5 COMPASS 5000.1 Build 61 �� �� �w�' Project: Prudhoe ���y Site: PB L Pad Well: L'O1 VYe|!bore: PlanLO1A Design: Plan #8LV1Acurrent From Colour To MD From 2400'md (30Omdabove planned KOP) voTD Scan interal 25 ft Scale 1 inch : 1OOh 0 2400 AllI wells pass the major risk e400 2700 .. 2700 3000 See ACsummary report for details 3000 3300 _ 3300 7800 o 7800 8150 All.WI rfAl I I I 8150 8250 8250 8350 33. t4k1.4,11411121.21‘,11,4* 1.01.11.11114011 3° Aii, 0/A0,:istietisirdiTtaito,. e/fg"iviloak 8350 .„0,,,riff,fr-_-...N,,,,,,:‘,........ ,B, . ...N.,,,,„ , ........--......____._,, ,, ,,,,,„„.." 4.01fr,,,„0„,,, ...,:---..,..--- ..._.---------- ,k,„„,„zi. 30.A.,,,,,...,,,,,, ./ ...._..,..... _______- 160 AMENNIA110101ZX/.....-.'..---•.:,..:----- 11114w..- ,,,clinualliiillarl til,,, tO/fre/ '.'" •'... '..." '''." '.' ---.".. ------- -7- 11kNilikiliklillki Mail' i i / '''' "-- --- -- - --. *It ariel)01,4P / .7'•:;':,./ ...s ../ „./ ..,•-••...--.. ....----- ------.. " ••--...NI‘AkViN11111 rint..,,__,,_,:,,./.. fit/ ifif // /://../ ../../..../.......:......../ .......:::::::::-.-ti., ...-..,:,...,...:\,......\\ ,.„,,,,,,,,,,,,,\\.\\,k.H‘4,1B,..„.,1 4. , , , , if, ( iii pw, :i rir ,--- om 90 ,,,.,,,!',-T.4.7'''94.:,....,...„..) :,..)../ifi if :) .; .,,i ,i ) ) ] „i ki, ,N1 i ! i , 10, ,.- , , ,. .. .. ..". „ %. ,.. ,.. ... _...... ...... , . .. .. .. .. A. .. .. , .. •. •.. ... .... .......... ...:„:, ..•.. ..... .... ..... /... .... .:,..,...,... ,... ...; ...., ,... ./ ,.., . , . „ ... . . . .. . .. .. . .„ __.-- , . .. .. .. .. .. . .. .. .. ., ..,. ... _ ...•. _ ..,... .... ... ,... .... .,... .... ....•••.„. .... ,... ..... /. .... 150 180 Azimuth from North [1 vs Centre to Centre Separation [40 usft/in] • • OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. • TRANSMITTAL LETTER CHECKLIST WELL NAME: ( "- -C / /q PTD: ` VDevelopment Service Exploratory Stratigraphic Test Non-Conventional - FIELD: r 4 POOL: �C ��Cf � l ( Check Box for Appropriate Letter/ Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI LATERAL The permit is for a new wellbore segment of existing well Permit (If last two digits No. , API No. 50- - - - in API number are Production should continue to be reported as a function of the original between 60-69) API number stated above. In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name Pilot Hole ( PH) and API number (50- - - - ) from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce / inject is contingent upon issuance of a Spacing Exception conservation order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: Production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are Well Logging also required for this well: Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 4/2014 • • ❑ El Ts co 0)a a o o N e o o @ co Tu Ea> a) 4 `o c w W 4 O T T co a Y o _: W• u) iCi 0 • o Y : �: E E 0 a , 0 N v.3 @: N t C0). N ' Q a> to L CA a) El Q U .-6 a> 3: 3, co N a) a) U) W I y CD O co Q C Cq. U): C CA 0 COU): C0: a p. D03 O �. .O. �: �• �' N V: 3 a) co F C) w °: O o p. O > N: co v a) O: a m cd OO o m' p '- E. co, a> E: m: D a co a C c : a): a O, �' N: co er O ,O U E: o in c co O Z QO 2 a) -C O' 7 Q a. 0 �� p, O: a 2 a) a, N —I . M U 2: a, V, a) 0, > >, �: I— ° m co 3: o y N: m '3: 1 co CC • O > • L a N U a. N: N @: C.: _, co 2: -iii N N CN co _: o < a) a) p rn rn aa> ;o u) c a o_ m: ED. 3, • 'O U) co Q 7 3 i C_, C_. N (0 C o) 2: a3 a) C' O CO W @ Cp N O E co a) (0 I 'p U' a)' a) V co' 0 €; a) 3 v z ° E O co co c 3 u o °: co: w o o: o. E: , I v c: W u) 3 a O o U (n (/) a, k: a: Q: gg: I _), o_ a W co0 co U) co CO CO U) U). U) U) U). (1) Cl) CO CO U) U) CO CO: Cl)' U) CO U) Q a) a) a) a) a) a) a) a), a) a) a) a) Q Q Q Q Q Q Q Q o a), a) a) a> Q, a), a> a): m, a) a) Q; 0a) < < < -- o. z >- r >- >- >- > >- >- >- >- } r z z z z z z z z z >- >- >- >- z >- >- >- >- >- >- z z >- z z z N T o m c d Ta amici m — E a: o p o c N. : c En O O c) U) _T E o a c ° a E h o -,..9 3 3 0, m O M' y: g �: --- ami E. w 2 o o O o a) c" o a m: o V �: I N Na �Ca) ui �O Oat); E N' f' ' ' O co ._ C O p �, i (o O: >� O (n c co .c C co >' 0- '' 7 < U) U) a)' W — a O C. .O O •N' 'C '°. (6.. a) O_ D O C. a) m 0 O p) N.. : t. a) C, '- O a) C. Lo CO >. c > 'D 4 d W a U). C C O: O: Ot CA a) OY. O O -1=7 7 C 0 'EO N N C (j) 3 0 U) V ~ " N d : c .r — 0 CV 3 °) a`) N N d C 0 a (n m _ w c a ° ° w o o Q ° CO c U 'Ck a o a) a . m 3 0 > m a)'� • Q 0, ° a) m C 0 7 7 °. -0 N • .O Y O. p a): I6 0, a3. a) N Q (`, y: :.'O O O) p, N. a) CO ° c> ° a> T -0 0 p m c a) C _ m o. �: o E, E O, 3 °, o c To v a) c. a Q o �, m fl Q �_ y, m m �p E m N a> y' M @' .N L o o n 3' o o' > 3 c o o z a s c - .( a) - c 3 3 > 2 - .. o �: v. o' = 2 1: D o ti a a = m, o: 3 0' co Z, ° W U o 0 O C w "O °O > O: N: .a "O. a� '�.. O: 0: O: N: @: O CA C. '° a W: O, a): 2 m o c m o, o c a a p m a) m p a) a> _ a>, o E' a> E p 0 c F a) a 'p a) a) A. U: 7 3. a C CS U d O' O' a) _ a aj N NCA O :r 7 C O' W O C6 Q L a N a a O a) a N U) a L a). (p: CA •° E C () N U) p. C =: -p a. U O E. N O O =, N 0. y N. co '— 'C U), = �- N co (0 @, 0 p a> 01 T : = V y U)' p a 3 cr,> m m ` c c, o C: 0 a o p m o: _ c: °, •>: Er O i4.IS .o c -o v -p. U C N -a Q -0 a, .c N °' F: 0 0 >: 2? •••,- ., L: N N �' w (,)� v: p U' a) a) 5, •° a) a a) E a) t @ ° t c c a> v c @, v a m = 3 v o; v) c p N c: m c 0 OS X 3 v c@i @, o o u3i co co E 0 o, o a> o' o: v' CO v CO r, U% ° E m c' � °' v v; c --- fn m c o 0 0 a o a) p 0 o' (pa H f- 1- Sr o >, °' a a Y Y co co E (a E' a m; ai LQ Y T o aa9 .0 a> a) a) c V n n a`i a) m °, 3 2 o o a t �' �: (O v CO V `o, -; O O r O' a a0 ai m; 'a a); 0; � 0 NN C 1 a _1 D 5 co w O O a a U 5 Q a z U U U U U U Q Q w 0 m m U 5 N; 2 a 0 m co U, , Ili Q O — N CO V U) (C) N- CO 0) 0 rN M •Yt UCO f,— CO C) 0 rN M V C( CO 1— Co 0) N M V La co r CO (A N N N N N N N N N (N M M M M M CO M M M M I— U V V - G O C d O a) d N ° O coce O Q O Q co 3 O 0 y W co '� M 0 N 0 COp N a � _ a aE J N .2 0 rn 0ooCl c o W> of C) CD > a Q Q W Q C� Q U ,