Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
214-172
7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU F-28C Mill CIBP Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 214-172 50-029-21649-03-00 12201 Surface Intermediate Liner Liner Liner 9047 2644 8565 752 771 3948 10690 13-3/8" 9-5/8" 7" 3-1/2" x 3-3/16" 2-3/8" 9057 31 - 2675 28 - 8593 8321 - 9073 8349 - 9120 8253 - 12201 31 - 2674 28 - 8457 8209 - 8896 8235 - 8938 8148 - 9047 11939, 12146 2260 4760 5410 10530 11780 10690, 10823 5020 6870 7240 10160 11200 10033 - 12140 4-1/2" 12.6# L-80 27 - 8391 9051 - 9045 Conductor 80 20" 32 - 112 32 - 112 1490 470 4-1/2" TIW HBBP Packer 8283 8176 Torin Roschinger Operations Manager Aras Worthington aras.worthington@hilcorp.com 907-564-4763 PRUDHOE BAY, Prudhoe Oil Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028280 27 - 8273 N/A N/A 408 338 2723 4282 84 72 1100 1100 200 200 N/A 13b. Pools active after work:Prudhoe Oil No SSSV Installed 8283, 8176 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 8:02 am, Jun 28, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2024.06.27 15:05:15 - 08'00' Torin Roschinger (4662) DSR-7/8/24WCB 9-10-2024 RBDMS JSB 070324 ACTIVITY DATE SUMMARY 6/12/2024 LRS Test Unit 6, Begin WSR on 6/12/24, Assist CTU w/ FCO, Unit Move, Begin RU, Continue WSR on 6/13/24 6/13/2024 LRS Test Unit 6, Continue WSR from 6/12/24, Assist CTU w/ FCO, Continue RU, POP, Continue WSR on 6/14/24 6/14/2024 LRS CTU 1, 1.5" Blue Coil. Job Objective: FCO MIRU. Function test BOPs upon installation. Make up and RIH with 1.5" DJN BHA. Tag the LTP 8285' CTM, Circulated the until the well was stable to do the FCO. Started the FCO and could not jet past the LTP, made multiple attempts to get in with no success. POOH. ***Job continued 6/15/24*** 6/14/2024 LRS Test Unit 6, Continue WSR from 6/13/24, Assist CTU w/ FCO, Continue flowing, Continue WSR on 6/15/24 6/15/2024 LRS CTU 1, 1.5" Blue Coil. Job Objective: FCO ***Job Continued from 6/14/24*** MU YJ milling assembly with 1.75" junk mill. RIH. Tagged at 8260 CTM. Attempt to mill and cannot make progress, but did establish communication to the perfs. Gas rate increases by 8MM. Shut in well and PUH. Attempt to bullhead well and it locks up at 44 bbl. POOH to inspect mill. burst disc on the circ sub is blown, With an AV sub and a blow burst disc, minimal flow to motor. Mill had moderate work on the shoulder, nothing on the face. Replace burst disc. Drop AV sub and pick up new 1.76" 3-blade junk mill. RIH. Tag obstruction 8262 CTM. Continue milling. Not making forward progress.POOH. ***Job Continued on 6/16/24*** 6/15/2024 LRS Test Unit 6, Continue WSR from 6/14/24, Assist CTU w/ FCO, Continue flowing, Continue WSR on 6/16/24 6/16/2024 LRS CTU 1, 1.5" Blue Coil. Job Objective: FCO ***Job Continued from 6/15/24*** Mill had wear on the outer edge on the face. MU YJ milling assembly with 1.76" 4 bladed reverse clutch junk mill. RIH. Tag restriction 8262 CTM. Continue milling. Break through restriction in LTP/Deployment sleeve. Pull above liner and dry drift. Tag at 9976 CTM, and begin to mill/push to 11939 CTM. Numerous spots where tag and overpull. Make it down to 11939. Bit stuck at 11939. Get free. PUH and ream 10655-10900. Pull out of liner and bullhead well with 1% KCL. Dry drift liner to 10950. Clean drift. POOH. Freeze protect outlet well. Make up and RIH with HES GR/CCL.Log up from 11,100 CTM to 10800 CTM. Paint blue flag. Log up to 9900 CTM. POOH. Good data at surface, +7' correction, Tied into HES Memory Coil Flag 5- Sept-2023. MU YJ 2-3/8" CIBP. RIH. ***Job continued 6/17/24***. 6/16/2024 LRS Test Unit 6, Continue WSR from 6/15/24, Assist CTU w/ FCO, Continue flowing, BD,RD,MO, Continue WSR on 6/17/24 6/17/2024 LRS Test Unit 6, Continue WSR from 6/16/24, Assist CTU w/ FCO, Continue flowing, BD,RD,MO, Continue WSR on 6/18/24 Daily Report of Well Operations PBU F-28C y y begin to mill/push to 11939 CTM. Numerous spots where taggg and overpull. Make it down to 11939. Bit stuck at 11939. Get free. PUH and ream 10655-10900. Pull out of liner and bullhead well with 1% KCL. Dry drift liner to 10950. Clean drift. POOH. Daily Report of Well Operations PBU F-28C 6/17/2024 LRS CTU 1, 1.5" Blue Coil. Job Objective: FCO ***Job Continued from 6/16/24*** Continue in hole with YJ 2-3/8" CIBP. At the flag, coorelate to mid element 10804.74'. Run past set depth, PUH to set depth 10815 MD. Pump 3/8" ball and go through setting sequence for the plug. RIH to stack weight on the plug and traveled further than expected before stacking 4K down on the plug. PUH and re-tag the plug stacking 10K surface weight down. Plug is 8' down from the intended set depth. Fish at 10823. PUH 50' from the flag and flag pipe. POOH. Lay down setting toola and all looks normal. Make up 2-3/8" Baker CIBP. RIH and correct depth at flag. Set CIBP at 10690. Well freeze protected with 38 bbl of diesel. Well status relayed to pad operator. Lay down setting tool and RDMO. ***Job Complete***. 6/18/2024 LRS Test Unit 6, Continue WSR from 6/16/24, Assist coil FCO. MO,Vessel Cleanout, End WSR on 6/18/24. Set CIBP at 10690 j Continue in hole with YJ 2-3/8" CIBP. At the flag, coorelate to mid element 10804.74'. g Run past set depth, PUH to set depth 10815 MD. Pump 3/8" ball and go through gg setting sequence for the plug. RIH to stack weight on the plug and traveled further gggg than expected before stacking 4K down on the plug. PUH and re-tag the pluggggg stacking 10K surface weight down. Plug is 8' down from the intended set depth. Fishggg at 10823. PUH 50' from the flag and flag pipe. POOH 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU F-28C Extended Perf w CTU Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 214-172 50-029-21649-03-00 12201 Surface Intermediate Liner Liner Liner 9047 2644 8565 752 771 3948 10843 13-3/8" 9-5/8" 7" 3-1/2" x 3-3/16" 2-3/8" 9055 31 - 2675 28 - 8593 8321 - 9073 8349 - 9120 8253 - 12201 31 - 2674 28 - 8457 8209 - 8896 8235 - 8938 8148 - 9047 12146 2260 4760 5410 10530 11780 10843 5020 6870 7240 10160 11200 10033 - 12140 4-1/2" 12.6# L-80 27 - 8391 9051 - 9045 Conductor 80 20" 32 - 112 32 - 112 1490 470 4-1/2" TIW HBBP Packer 8283, 8176 8283 8176 Torin Roschinger Operations Manager Kirsty Glasheen kirsty.glasheen@hilcorp.com 907-564-5258 PRUDHOE BAY, Prudhoe Oil Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028280 27 - 8273 N/A N/A 31 408 3426 2723 88 84 1300 1100 220 200 323-541 13b. Pools active after work:Prudhoe Oil No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 12:14 pm, Nov 29, 2023 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.11.28 13:46:11 -09'00' Torin Roschinger (4662) DSR-11/29/23 RBDMS JSB 120523 WCB 5-10-2024 ACTIVITY DATE SUMMARY 11/16/2023 LRS CTU #1 - 1.50" Blue Coil Job Objective: Extended AddPerf MIRU CTU. Make up drift BHA with 1.75" DJN and RIH. Tag fill at 9368', and hard bridge at 9396'. Jet through and able to clean out to the top of the CIBP at 11845' CTMD, with other small tags across the perfs. POOH chasing out solids at 80% of AV. LD LRS BHA, M/U HES GR/CCL. RIH tag restriction at 9281, attempt to get past but unsuccessful. log from 9275, Flag at 9200 POOH maintaining hole fill with KCL ...Continue to WSR on 11/17/23...... 11/17/2023 LRS CTU #1 - 1.50" Blue Coil Job Objective: Extended AddPerf Log up to 8350. POOH maintaining hole fill. L/D logging tools. M/U LRS 1.75" JSN. RIH tag restriction at 9285, Jet restriction with powervis sweeps. Push debris to top of CIBP. Perform dry drift from 8800'-10300' ensuring the heel is clear. Circulate gel pill off bottom and spot in heel from 8400'-9400'. Chase powervis out at 80% of AV at max rate all the way to surface. L/D LRS BHA, Hold PJSM for open hole operations. Perform Kick while tripping drill. Deploy 245' of HES 1.56" Geo Razor guns (171' of charges). 6 shots per ft, 60 degree phase. Tie-in to coil flag and perforate 3 intervals, 10033-10117, 10160-10177, and 10208-10278. POOH maintaining hole fill. ...Continue to WSR on 11/18/23.......... 11/18/2023 LRS CTU #1 - 1.50" Blue Coil Job Objective: Extended AddPerf POOH with spent guns, maintain hole fill with KCL. un-deploy guns. M/U LRS 1.75" JSN RIH freeze protect well from 2,500' (38 bbls 60/40) LD BHA. RDMO CTU. ***Job Complete*** Daily Report of Well Operations PBU F-28C Deploy 245' of HES 1.56" Geo Razor guns (171' ofgyg( charges). 6 shots per ft, 60 degree phase. Tie-in to coil flag and perforate 3 intervals, g) g 10033-10117, 10160-10177, and 10208-10278. POOH 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in thes pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU F-28C Extended Perf w CTU Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 214-172 50-029-21649-03-00 341J ADL 0028280 12201 Surface Intermediate Liner Liner Liner 9047 2644 8565 752 771 3948 10843 13-3/8" 9-5/8" 7" 3-1/2" x 3-3/16" 2-3/8" 9055 31 - 2675 28 - 8593 8321 - 9073 8349 - 9120 8253 - 12201 2400 31 - 2674 28 - 8457 8209 - 8896 8235 - 8938 8148 - 9047 12146 2260 4760 5410 10530 11780 10843 5020 6870 7240 10160 11200 10400 - 12140 4-1/2" 12.6# L-80 27 - 83919061 - 9045 Conductor 80 20" 32 - 112 32 - 112 1490 470 4-1/2" TIW HBBP Packer No SSSV Installed 8283, 8176 Date: Torin Roschinger Operations Manager Kirsty Glasheen kirsty.glasheen@hilcorp.com 907-564-5258 PRUDHOE BAY 10/18/2023 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 11:18 am, Oct 04, 2023 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.10.03 17:20:31 -08'00' Torin Roschinger (4662) 323-541 DSR-10/5/23SFD 10/5/2023 Perforate 2400 MGR24OCT23 10-404 *&: Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.10.24 13:53:33 -08'00'10/24/23 RBDMS JSB 102623 Extended Add Perf \\\\\\\Well: F-28C Well Name:F-28C API Number:50-029-21649-03 Current Status:Shut in – low PI Pad:F-Pad Estimated Start Date:10/18/2023 Rig:CTU Reg. Approval Req’d?10-403 & 10-404 Date Reg. Approval Rec’vd:TBD Regulatory Contact:Abbie Barker Permit to Drill Number:214-172 First Call Engineer:Kirsty Glasheen Contact:907-350-4310 Current Bottom Hole Pressure:3206 psi SBHPS – 11/12/13 MPSP:2400 psi (BHP - .1psi/ft gas gradient + safety factor) Bottomhole Temp:193 deg Max Dev:97 deg At 9425’ MD Min ID:1.78” ID Wiper Plug Bushing at 8,270’ MD Brief Well Summary: F-28C is a 2015 Z1B CST. We recently set a CIBP at 10,843’ MD and added ~250’ of perforations. After the perfs were shot, the well would not kick off. F-28C was loaded with diesel and a “deep” gas lift design was set. While loading the well with diesel, it was confirmed F-28C has low injectivity, so it is suspected we perforated a low productivity zone. There is a patch across GLM#2 to repair TxIA, so we could not set our S/O below this depth. F-28C was unloaded to the S/O, but it never sustained long term flow, so we would like to add additional perforations to increase the PI. F-28C is twinned with F-27B, a sag rich gas well, so ideally, we would be able to flow F-28C in HP. Objective: The purpose of this procedure is to add additional perforation footage in the well to allow the well to flow as a full-time producer. NOTES: x Well has a patch across GLM #2 at 7741’-7778’ – ID = 2.45”. x Well has DSSSV set with ~2.6” ID. x Needs 1.5” CT Procedure: Coil – Extended Perforating Notes: x Remote gas monitoring for H2S and LELs are required for Open Hole Deployment Operations x Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS coverage is required. The well will be killed and monitored before making up the initial perf guns. This is generally done during the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. 1. MIRU 1.5” CTU 2. After MU MHA and pull testing the CTC, tag-up on the CT stripper to ensure BHAcannot pull through the brass upon POOH with guns. 3. RIH with GR/CCL & nozzle. Tag plug at ~10,843’ MD. PUH and paint flag for plug/perfs depths. Use plug tag or flag for tie-in at WSL discretion. 4. Bullhead ~200 bbls 1% KCL/SW down tubing. Max tubing pressure 2500 psi. (This step can be performed any time prior to open-hole deployment of the perf guns. Timing of the well kill is at the discretion of the WSS.) a. Wellbore volume to top perf = 135.7 bbls Extended Add Perf \\\\\\\Well: F-28C b. 4-1/2” Tubing/Liner – 8,245’ X .0152bpf = 125.3 bbls c. 2-3/8” Liner – 2655’ X 0.0039 = 10.4 bbl 5. Prepare for deployment of TCP guns. 6. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/KWF, 8.4 ppg 1% KCl or 8.5 ppg as needed. Maintain hole fill taking returns to tank until lubricator connection is re-established. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. 7.*Perform drill by picking up safety joint with TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. a.At the beginning of each job, the crossover/safety joint must be physically MU to the perf guns one time to confirm the threads are compatible. 8.Break lubricator connection at QTS and begin makeup of TCP guns per schedule below. Constantly monitor fluid rates pumped in and fluid returns out of the well. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. Perf Schedule 1.56” Perfecta guns preferred. If Perfecta not available, Millenium or equivalent is ok. (6 spf, 60 phasing, random orientation) Run Interval Perf Length Gun Length Weight of Gun (lbs) Run #1 10,033’-10,117’84’84’420 lbs (5 ppf) 10,117’-10,160’0’43’215 lbs (5 ppf) 10,160’-10,177’17’17’85 lbs (5 ppf) 10,177-10,208’0’31’155 lbs (5 ppf) 10,208’-10,278’70’70’350 lbs (5 ppf) TOTAL 171’245’1225 lbs 9. RIH with perf gun and tie-in to coil flag correlation.Pickup and perforate interval per Perf Schedule above. a. Note any tubing pressure change in WSR. 10. After perforating, PUH to top of liner or into tubing tail to ensure debris doesn’t fall in on the guns and stick the BHA. Confirm well is dead and re-kill if necessary before pulling to surface. 11. Pump pipe displacement while POOH. Stop at surface to reconfirm well is dead. Kill well if necessary. 12. Review well control steps and Standing Orders with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 13. Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun BHA. 14. RDMO. Turn well over to Operations to POP. Attachments: Current & Proposed Wellbore Schematic Tie In Log CTU BOP Standing Orders & Equipment Layout Sundry Change Form Make up PCE - mgr Extended Add Perf \\\\\\\Well: F-28C Current Schematic: DOME DMY SO 9/23/23 9/23/23 9/23/23 10/12/86 9/23/23 Extended Add Perf \\\\\\\Well: F-28C Proposed Schematic: DOME DMY SO 9/23/23 9/23/23 9/23/23 10/12/86 9/23/23 Add Perfs: 10,033’-10,117’ MD 10,160’-10,177’ MD 10,208’-10,278’ MD Extended Add Perf \\\\\\\Well: F-28C Tie-in Log Extended Add Perf \\\\\\\Well: F-28C Perforate the following intervals: 10,033’-10,117’ MD 10,160’-10,177’ MD 10,208’-10,278’ MD Extended Add Perf \\\\\\\Well: F-28C BOP Schematic Extended Add Perf \\\\\\\Well: F-28C Extended Add Perf \\\\\\\Well: F-28C Extended Add Perf \\\\\\\Well: F-28C Changes to Approved Sundry Procedure Date: Subject: Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HAK Prepared By (Initials) HAK Approved By (Initials) AOGCC Written Approval Received (Person and Date) Approval: Operations Manager Date Prepared: Operations Engineer Date 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU F-28C Extended Perf w CTU Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 214-172 50-029-21649-03-00 12201 Surface Intermediate Liner Liner Liner 9047 2644 8565 752 771 3948 10843 13-3/8" 9-5/8" 7" 3-1/2" x 3-3/16" 2-3/8" 9055 31 - 2675 28 - 8593 8321 - 9073 8349 - 9120 8253 - 12201 31 - 2674 28 - 8457 8209 - 8896 8235 - 8938 8148 - 9047 12146 2260 4760 5410 10530 11780 10843 5020 6870 7240 10160 11200 10400 - 12140 4-1/2" 12.6# L-80 27 - 8391 9061 - 9045 Conductor 80 20" 32 - 112 32 - 112 1490 470 4-1/2" TIW HBBP Packer 8283, 8176 8283 8176 Torin Roschinger Area Operations Manager Michael Hibbert michael.hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028280 27 - 8273 N/A N/A 555 Well Not Online 53471 44 450 1000 1200 180 323-429 13b. Pools active after work:PRUDHOE OIL No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.09.12 17:40:11 -08'00' Torin Roschinger (4662) By Grace Christianson at 10:56 am, Sep 13, 2023 DSR-9/15/23 RBDMS JSB 091423 ACTIVITY DATE SUMMARY 9/5/2023 LRS CTU1 1.5" Blue Coil, Job Objective: Log, Set CIBP, Extended Ad Perf MIRU. Function test BOPs. MU & RIH w/ YJ MHA and HES Memory GR/CCL logging tools w/ 1.75" DJN. Kill well w/ 6 bbls 50/50 spear, 177 bbls Slick sea water, and 7 bbls 50/50 cap. Log up from 11,000' to 10,000' CTMD. Paint tie-in flag at 10,300' CTMD. POOH. ***Job Continued on 9/6/23*** 9/6/2023 LRS CTU1 1.5" Blue Coil, Job Objective: Log, Set CIBP, Extended Ad Perf OOH with logging tools and have a +27' correction. Log corrected to PDCL 12-18- 2014. Make up and RIH with 2.375" YJ CIBP. Set CIBP at 10843. Tag plug and confirm set. Pull out of liner and fill up well - 10 bbl. PT plug to 554 psi. Bleed off and flow check well - no flow. POOH pumping pipe displacement with sea water. Deploy 255' of 1.56" HES Geo Razors 6spf, 60 deg phased. Perforate 10400-10655. POOH pumping pipe displacement. Flow check well and lay down perf gun. Minimal injectivity. Make up and RIH with JSN BHA to freeze protect well to 2500' TVD with DSL & 50/50. Well status relayed to the pad operator. ***Job Complete*** Daily Report of Well Operations PBU F-28C 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in thes pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU F-28C Extended Perf w CTU Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 214-172 50-029-21649-03-00 341J ADL 0028280 12201 Surface Intermediate Liner Liner Liner 9047 2644 8565 752 771 3948 12159 13-3/8" 9-5/8" 7" 3-1/2" x 3-3/16" 2-3/8" 9046 31 - 2675 28 - 8593 8321 - 9073 8349 - 9120 8253 - 12201 2400 31 - 2674 28 - 8457 8209 - 8896 8235 - 8938 8148 - 9047 12146 2260 4760 5410 10530 11780 None 5020 6870 7240 10160 11200 10900 - 12140 4-1/2" 12.6# L-80 28 - 83919055 - 9045 Conductor 80 20" 32 - 112 32 - 112 1490 470 4-1/2" Baker Production PKR No SSSV Installed 8283, 8176 Date: Torin Roschinger Operations Manager Michael Hibbert michael.hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY 8/15/2023 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 9:03 am, Jul 31, 2023 323-429 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2023.07.28 10:28:25 -08'00' Torin Roschinger (4662) MGR01AUG23 SFD 8/9/2023 2400 DSR-7/31/23 10-404 GCW 08/09/2023JLC 8/9/2023 08/09/23 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.08.09 15:41:32 -08'00' RBDMS JSB 081123 Set CIBP & Ext AdPerf Well: F-28C Well Name:F-28C API Number:50-029-21649-03-00 Current Status:Shut in – HGOR Pad:F-Pad Estimated Start Date:8/15/2023 Rig:CTU Reg. Approval Req’d?10-403 & 10-404 Date Reg. Approval Rec’vd: Regulatory Contact:Abbie Barker Permit to Drill Number:214-172 First Call Engineer:Michael Hibbert Contact:907-903-5990 Current Bottom Hole Pressure:3206 psi SBHPS – 11/12/13 MPSP:2400 psi (BHP - .1psi/ft gas gradient + safety factor) Bottomhole Temp:193 deg Max Dev:97 deg At 9425’ MD Min ID:1.78” ID Wiper Plug Bushing at 8,270’ MD Brief Well Summary: F-28C is a 2015 Z1B CST. When drilled the well had known, but unremedied TxIA. A post rig LDL discovered tubing leaks in GLM 2 and the SSSV control lines, which were remedied with a patch and DSSSV respectively. An LTP was also set post rig and its integrity has been confirmed during the post rig LDL. F-28C is twinned with F- 27B, a Sag rich gas well, and usually flow comingled. Objective: The purpose of this procedure is to isolate current perforations and perforate uphole to increase rate and lower the well's TGOR by accessing unproduced sands along the lateral. NOTES: x Well has a patch across GLM #2 at 7741’-7778’ – ID = 2.45”. x Needs 1.5” CT Procedure: Coil – CIBP 1. MIRU 1.5” CTU – include considerations for extended perforating deployment. 2. After MU MHA and pull testing the CTC, tag-up on the CT stripper to ensure BHA cannot pull through the brass upon POOH with guns. 3. RIH with GR/CCL and ~1.8” nozzle to ~10,900’. PUH and paint flag for plug/perfs depths. 4. POOH. 5. MU 2-3/8” CIBP. RIH and set at 10,835’. Tag to confirm good set. POOH. Coil – Extended Perforating Notes: x Remote gas monitoring for H2S and LELs are required for Open Hole Deployment Operations x Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS coverage is required. The well will be killed and monitored before making up the initial perf guns. This is generally done during the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. Remote gas monitoring for H2S and LELs are required f o isolate current perforations and perforate uphole t Set CIBP & Ext AdPerf Well: F-28C 1. Bullhead ~163 bbls 1% KCL/SW down tubing. Max tubing pressure 2500 psi. (This step can be performed any time prior to open-hole deployment of the perf guns. Timing of the well kill is at the discretion of the WSS.) a. Wellbore volume to top perf = 135.7 bbls b. 4-1/2” Tubing/Liner – 8,245’ X .0152bpf = 125.3 bbls c. 2-3/8” Liner – 2655’ X 0.0039 = 10.4 bbl 2. Prepare for deployment of TCP guns. 3. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/KWF, 8.4 ppg 1% KCl or 8.5 ppg as needed. Maintain hole fill taking returns to tank until lubricator connection is re-established. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. 4.*Perform drill by picking up safety joint with TIW valve and space out before MU guns. Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. a.At the beginning of each job, the crossover/safety joint must be physically MU to the perf guns one time to confirm the threads are compatible. 5.Break lubricator connection at QTS and begin makeup of TCP guns per schedule below. Constantly monitor fluid rates pumped in and fluid returns out of the well. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. Perf Schedule Use 1.56” guns or similar Perf Interval Perf Length Gun Length Weight of Gun (lbs) Run #1 10,400’ – 10,655’255’255’1275 lbs (5 ppf) 6. RIH with perf gun and tie-in to coil flag correlation, consider tagging the CIBP if there is any discrepancy with depths. Pickup and perforate interval per Perf Schedule above. a. Note any tubing pressure change in WSR. 7. After perforating, PUH to top of liner or into tubing tail to ensure debris doesn’t fall in on the guns and stick the BHA. Confirm well is dead and re-kill if necessary before pulling to surface. 8. Pump pipe displacement while POOH. Stop at surface to reconfirm well is dead. Kill well if necessary. 9. Review well control steps and Standing Orders with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 10. Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun BHA. 11. RDMO. Turn well over to Operations to POP. Attachments: 1. Current Wellbore Schematic 2. Proposed Wellbore Schematic 3. Tie in Log 4. BOP Schematic 5. Standing Orders 6. Equipment Layout 7. Sundry Change Form Make up PCE. Set CIBP & Ext AdPerf Well: F-28C Current Schematic: Set CIBP & Ext AdPerf Well: F-28C Proposed Schematic: Set 2-3/8” CIBP at 10,835’ – Isolating these perf intervals Perforate the following intervals: 10,400’ – 10,655’ Set CIBP & Ext AdPerf Well: F-28C BOP Schematic Set CIBP & Ext AdPerf Well: F-28C Set CIBP & Ext AdPerf Well: F-28C Set CIBP & Ext AdPerf Well: F-28C Changes to Approved Sundry Procedure Date: Subject: Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HNS Prepared By (Initials) HNS Approved By (Initials) AOGCC Written Approval Received (Person and Date) Approval: Operations Manager Date Prepared: Operations Engineer Date 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU F-28C Mill CIBP Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 214-172 50-029-21649-03-00 12201 Surface Intermediate Liner Liner Liner 9047 2644 8565 752 771 3948 12159 13-3/8" 9-5/8" 7" 3-1/2" x 3-3/16" 2-3/8" 9046 31 - 2675 28 - 8593 8321 - 9073 8349 - 9120 8253 - 12201 31 - 2674 28 - 8457 8209 - 8896 8235 - 8938 8148 - 9047 12146 2260 4760 5410 10530 11780 None 5020 6870 7240 10160 11200 10900 - 12140 4-1/2" 12.6# L-80 27 - 8391 9055 - 9045 Conductor 80 20" 32 - 112 32 - 112 1490 470 4-1/2" TIW HBBP Packer 8283, 8176 8283 8176 Stan Golis Sr. Area Operations Manager Wyatt Rivard wrivard@hilcorp.com 907.777.8547 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028280 27 - 8273 N/A N/A 241 578 22103 19765 24 376 150 1500 1017 362 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations correct to the best of my December 3, 2022 By Anne Prysunka at 10:57 am, Dec 06, 2022 WCB 11-26-2024 RBDMS JSB 120623 ACTIVITY DATE SUMMARY 11/26/2022 LRS CTU #2 - 1.50" Blue Coil Job Objective: Mill CIBP MIRU CTU. Make up milling BHA with 1.75" 3-bladed junk mill. Bullhead 200 bbls of KCI. RIH w/YJ milling BHA w/1.75" 3 bladed junk mill. Swap coil over to KCI. Dry tagged 2-3/8" BOT CIBP @ 11,506' ctm / 11,530' MD. Establish free spin and begin milling CIBP. One stall then unable to get any motor work. No response to weight, pump rate, and not milling off. Pooh w/BHA to inspect as per YJ rep. ...Job in Progress... 11/27/2022 LRS CTU #2 - 1.50" Blue Coil Job Objective: Mill CIBP Pooh w/YJ milling BHA to inspect. On surface, change out motor & mill. RIH w/YJ milling BHA w/1.74" 3 Bladed Junk Mill. Tagged CIBP 11,510' ctmd. Milled CIBP and pushed to TD tag of 12,126 CTMD (12146 MD based on CIBP set depth). POOH and FP well with Diesel. Blow down reel for pipe swap. RDMO to LRS yard. ***Job Complete*** Daily Report of Well Operations PBU F-28C CIBP fish is correctly shown on the WBS below. -WCB Milled CIBP andggg pushed to TD tag of 12,126 CTMD (12146 MD based on CIBP set depth). 214172 RECEIVED 2 5 6 8 9 APR 10 2015 Letter of Transmittal AoGeo BAKER Date: DATA LOGGED April 8, 2015 ��/2015 HUGHES _ fv K.BENDER To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Paula Lacey paula.lacey@bakerhughes.com Please find enclosed the final directional survey data for the following well(s): F-28C Enclosed for each well(s): 2 hardcopy prints of final directional survey reports 1 compact disc of final directional survey reports0 Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: f29L ' 'z"-, Oof Alaska AOGCC DATE: L 714172 15689 REOmmYID ok APR 10 Z015 bp A00 North America - ALASKA - BP Prudhoe Bay PB F Pad F-28 - Slot 28 500292164900 F-28C Design: F-28C Survey Report - Geographic 09 December, 2014 BAKER HUGHES IA- 0 by Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-28-Slot 28 a ' Project: Prudhoe Bay TVD Reference: ORKB @ 66.71 usft , Site: PB F Pad MD Reference: ORKB @ 66.71 usft (� i� at a , Well: F-28 North Reference: True ,, ° Wellbore: F-28C Survey Calculation Method: Minimum Curvature -.'...' i'€5 Design: F-28C Database: EDM R5K-Alaska PROD ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB F Pad,TR-11-13 Site Position: Northing: 5,972,527.29 usft Latitude: 70°19'55.283 N From: Map Easting: 650,960.70 usft Longitude: 148°46'31.47 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.15 ° Well F-28 API No. 500292164900 Well Position +N/-S 0.00 usft Northing: 5,973,893.00 usft Latitude: 70°20'8.377 N +EI-W 0.00 usft Easting: 652,650.00 usft Longitude: 148°45'41.34 W Position Uncertainty 0.00 usft Wellhead Elevation: 37.86 usft Ground Level: 36.46 usft 'Wellbore F-28C API no. 500292164903 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BG G M 2014 11/30/2014 19.52 81.02 57,597 Design F-28C Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,099.16 Vertical Section: Depth From(TVD) +N/-S +EI-W Direction (usft) (usft) (usft) r) 31.21 0.00 0.00 59.57 Survey Program Date: 12/9/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 9,000.01 1 :Sperry-Sun BOSS gyro multi(F-28) BOSS-GYRO Sperry-Sun BOSS gyro multishot 9,069.01 9,099.16 MWD(F-28A) MWD MWD-Standard 9,120.00 12,171.87 MWD(F-28C) MWD MWD-Standard 12/9/2014 11:49:06AM Page 2 COMPASS 5000.1 Build 61 ri- 0 bp Survey Report-Geographic BAKER HUGHES ,Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-28-Slot 28 Project: Prudhoe Bay TVD Reference: ORKB @ 66.71 usft Site: PB F Pad , MD Reference: ORKB @ 66.71 usft Well: F-28 North Reference: True Wellbore: F-28C Survey Calculation Method: Minimum Curvature Design: F-28C Database: EDM RSK-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-S +E/-W Northing Easting (usft) (°) (0) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 31.21 0.00 0.00 31.21 0.00 0.00 5,973,893.00 652,650.00 70°20'8.377 N 148°45'41.34 W 100.00 1.02 97.31 100.00 -0.08 0.61 5,973,892.94 652,650.61 70°20'8.376 N 148°45'41.32 W 200.00 1.27 94.40 199.98 -0.28 2.60 5,973,892.78 652,652.60 70°20'8.374 N 148°45'41.26 W 300.00 1.02 106.81 299.96 -0.62 4.55 5,973,892.47 652,654.56 70°20'8.371 N 148°45'41.21 W 400.00 1.25 113.61 399.94 -1.31 6.40 5,973,891.82 652,656.43 70°20'8.364 N 148°45'41.15 W 500.00 0.87 133.00 499.92 -2.27 7.96 5,973,890.90 652,658.00 70°20'8.355 N 148°45'41.11 W 600.00 1.10 121.61 599.91 -3.29 9.33 5,973,889.90 652,659.39 70°20'8.345 N 148°45'41.07 W 700.00 0.88 133.00 699.89 -4.32 10.71 5,973,888.90 652,660.79 70°20'8.334 N 148°45 41.03 W 800.00 0.92 125.31 799.88 -5.30 11.93 5,973,887.94 652,662.03 70°20'8.325 N 148°45'40.99 W 900.00 0.75 119.31 899.87 -6.09 13.15 5,973,887.18 652,663.27 70°20'8.317 N 148°45'40.95 W 1,000.00 0.85 89.10 999.86 -6.40 14.46 5,973,886.90 652,664.59 70°20'8.314 N 148°45 40.92 W 1,100.00 0.78 86.80 1,099.85 -6.35 15.89 5,973,886.98 652,666.01 70°20'8.314 N 148°45'40.87 W 1,200.00 0.68 69.39 1,199.84 -6.10 17.12 5,973,887.25 652,667.24 70°20'8.317 N 148°45'40.84 W 1,300.00 0.47 39.00 1,299.83 -5.57 17.93 5,973,887.80 652,668.04 70°20'8.322 N 148°45 40.81 W 1,400.00 1.22 316.00 1,399.83 -4.49 17.45 5,973,888.87 652,667.54 70°20'8.333 N 148°45 40.83 W 1,500.00 2.23 327.31 1,499.78 -2.08 15.66 5,973,891.24 652,665.70 70°20'8.356 N 148°45'40.88 W 1,600.00 2.20 330.50 1,599.70 1.22 13.67 5,973,894.50 652,663.64 70°20'8.389 N 148°45'40.94 W 1,700.00 1.50 334.31 1,699.65 4.07 12.15 5,973,897.32 652,662.07 70°20'8.417 N 148°45'40.98 W 1,800.00 1.02 334.70 1,799.63 6.06 11.21 5,973,899.28 652,661.08 70°20'8.436 N 148°45'41.01 W 1,900.00 0.45 8.89 1,899.62 7.25 10.89 5,973,900.47 652,660.74 70°20'8.448 N 148°45'41.02 W 2,000.00 0.47 356.40 1,999.62 8.05 10.92 5,973,901.27 652,660.75 70°20'8.456 N 148°45 41.02 W 2,100.00 0.25 39.69 2,099.61 8.63 11.04 5,973,901.85 652,660.86 70°20'8.462 N 148°45'41.02 W 2,200.00 0.15 84.89 2,199.61 8.80 11.31 5,973,902.03 652,661.12 70°20'8.464 N 148°45'41.01 W 2,300.00 0.25 110.11 2,299.61 8.74 11.64 5,973,901.98 652,661.46 70°20'8.463 N 148°45 41.00 W 2,400.00 0.57 125.40 2,399.61 8.38 12.25 5,973,901.63 652,662.08 70°20'8.459 N 148°45'40.98 W 2,500.00 0.72 129.61 2,499.60 7.69 13.14 5,973,900.96 652,662.98 70°20'8.453 N 148°45 40.95 W 2,600.00 0.72 129.50 2,599.60 6.89 14.11 5,973,900.18 652,663.96 70°20'8.445 N 148°45'40.93 W 2,700.00 0.75 118.31 2,699.59 6.18 15.17 5,973,899.49 652,665.04 70°20'8.438 N 148°45 40.90 W 2,800.00 0.90 116.70 2,799.58 5.52 16.45 5,973,898.85 652,666.33 70°20'8.431 N 148°45'40.86 W 2,900.00 0.97 116.31 2,899.56 4.79 17.91 5,973,898.15 652,667.81 70°20'8.424 N 148°45'40.82 W 3,000.00 1.18 117.90 2,999.55 3.93 19.58 5,973,897.33 652,669.49 70°20'8.416 N 148°45'40.77 W 3,100.00 1.30 117.40 3,099.52 2.93 21.49 5,973,896.36 652,671.43 70°20'8.406 N 148°45 40.71 W 3,200.00 1.32 123.70 3,199.50 1.77 23.46 5,973,895.24 652,673.42 70°20'8.394 N 148°45 40.65 W 3,300.00 1.15 134.00 3,299.47 0.43 25.14 5,973,893.94 652,675.12 70°20'8.381 N 148°45'40.60 W 3,400.00 0.75 154.70 3,399.46 -0.86 26.14 5,973,892.67 652,676.15 70°20'8.368 N 148°45 40.57 W 3,500.00 0.78 161.81 3,499.45 -2.10 26.63 5,973,891.45 652,676.67 70°20'8.356 N 148°45'40.56 W 3,600.00 0.87 148.50 3,599.44 -3.39 27.24 5,973,890.16 652,677.30 70°20'8.344 N 148°45'40.54 W 3,700.00 0.67 163.40 3,699.43 -4.60 27.81 5,973,888.97 652,677.89 70°20'8.332 N 148°45'40.53 W 3,800.00 0.63 161.31 3,799.43 -5.68 28.15 5,973,887.90 652,678.26 70°20'8.321 N 148°45'40.52 W 3,900.00 0.62 179.40 3,899.42 -6.74 28.33 5,973,886.84 652,678.46 70°20'8.311 N 148°45'40.51 W 4,000.00 0.62 178.31 3,999.41 -7.82 28.35 5,973,885.76 652,678.50 70°20'8.300 N 148°45'40.51 W 4,100.00 0.55 187.30 4,099.41 -8.84 28.31 5,973,884.74 652,678.48 70°20'8.290 N 148°45'40.51 W 4,200.00 0.62 191.30 4,199.40 -9.85 28.14 5,973,883.73 652,678.33 70°20'8.280 N 148°45'40.52 W 4,300.00 0.55 190.80 4,299.40 -10.85 27.94 5,973,882.72 652,678.16 70°20'8.270 N 148°45'40.52 W 4,400.00 0.45 208.89 4,399.39 -11.66 27.67 5,973,881.90 652,677.89 70°20'8.262 N 148°45'40.53 W 4,500.00 0.45 210.10 4,499.39 -12.35 27.28 5,973,881.21 652,677.52 70°20'8.255 N 148°45'40.54 W 4,600.00 0.25 225.50 4,599.39 -12.84 26.93 5,973,880.71 652,677.18 70°20'8.251 N 148°45'40.55 W 4,700.00 0.12 248.69 4,699.39 -13.03 26.67 5,973,880.52 652,676.93 70°20'8.249 N 148°45'40.56 W 4,800.00 0.40 88.00 4,799.39 -13.06 26.92 5,973,880.49 652,677.18 70°20'8.248 N 148°45'40.55 W 4,900.00 0.22 97.90 4,899.39 -13.07 27.46 5,973,880.49 652,677.72 70°20'8.248 N 148°45'40.54 W 5,000.00 0.37 124.31 4,999.39 -13.28 27.92 5,973,880.29 652,678.18 70°20'8.246 N 148°45'40.52 W 5,100.00 0.57 251.89 5,099.38 -13.62 27.71 5,973,879.95 652,677.98 70°20'8.243 N 148°45'40.53 W 5,200.00 0.75 274.81 5,199.38 -13.72 26.59 5,973,879.83 652,676.86 70°20'8.242 N 148°45'40.56 W 5,300.00 1.35 315.11 5,299.36 -12.83 25.11 5,973,880.69 652,675.36 70°20'8.251 N 148°45'40.61 W 5,400.00 1.87 328.00 5,399.32 -10.61 23.41 5,973,882.87 652,673.62 70°20'8.273 N 148°45'40.65 W 12/9/2014 11:49:06AM Page 3 COMPASS 5000.1 Build 61 �,,..,Z FA- _ bp Survey Report-Geographic BAKER •"'' HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-28-Slot 28 Project: Prudhoe Bay TVD Reference: ORKB @ 66.71 usft Site: PB F Pad MD Reference: ORKB @ 66.71 usft Well: F-28 North Reference: True Wellbore: F-28C Survey Calculation Method: Minimum Curvature Design: F-28C Database: EDM R5K-Alaska PROD-ANCP1 Survey ' Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 5,500.00 1.88 334.31 5,499.27 -7.75 21.83 5,973,885.70 652,671.98 70°20'8.301 N 148°45'40.70 W 5,600.00 2.08 339.00 5,599.21 -4.57 20.47 5,973,888.84 652,670.56 70°20'8.332 N 148°45'40.74 W 5,700.00 1.93 349.31 5,699.15 -1.23 19.51 5,973,892.17 652,669.53 70°20'8.365 N 148°45'40.77 W 5,800.00 1.60 347.90 5,799.10 1.79 18.90 5,973,895.18 652,668.86 70°20'8.395 N 148°45'40.79 W 5,900.00 1.10 344.90 5,899.07 4.09 18.36 5,973,897.46 652,668.27 70°20'8.417 N 148°45'40.80 W 6,000.00 0.62 340.50 5,999.06 5.52 17.93 5,973,898.89 652,667.81 70°20'8.431 N 148°45'40.81 W 6,100.00 0.75 332.90 6,099.05 6.62 17.45 5,973,899.97 652,667.31 70°20'8.442 N 148°45'40.83 W 6,200.00 0.62 338.61 6,199.05 7.70 16.96 5,973,901.05 652,666.80 70°20'8.453 N 148°45'40.84 W 6,300.00 0.45 332.31 6,299.04 8.55 16.58 5,973,901.89 652,666.40 70°20'8.461 N 148°45 40.85 W 6,400.00 0.50 333.20 6,399.04 9.29 16.20 5,973,902.62 652,666.00 70°20'8.468 N 148°45 40.87 W 6,500.00 2.02 34.39 6,499.01 11.13 17.00 5,973,904.48 652,666.77 70°20'8.486 N 148°45 40.84 W 6,600.00 6.15 45.00 6,598.74 16.38 21.78 5,973,909.82 652,671.44 70°20'8.538 N 148°45'40.70 W 6,700.00 11.12 45.00 6,697.58 26.99 32.40 5,973,920.64 652,681.84 70°20'8.642 N 148°45'40.39 W 6,800.00 13.47 44.00 6,795.27 42.19 47.31 5,973,936.14 652,696.43 70°20'8.792 N 148°45'39.96 W 6,900.00 14.62 45.80 6,892.28 59.37 64.45 5,973,953.66 652,713.22 70°20'8.961 N 148°45'39.46 W 7,000.00 15.77 46.19 6,988.79 77.57 83.30 5,973,972.25 652,731.70 70°20'9.140 N 148°45'38.91 W 7,100.00 17.02 47.50 7,084.72 96.87 103.90 5,973,991.96 652,751.90 70°20'9.330 N 148°45'38.30 W 7,200.00 18.72 48.80 7,179.89 117.33 126.76 5,974,012.88 652,774.34 70°20'9.531 N 148°45'37.64 W 7,300.00 19.85 50.10 7,274.28 138.79 151.86 5,974,034.84 652,799.00 70°20'9.742 N 148°45'36.90 W 7,400.00 20.93 52.60 7,368.01 160.53 179.08 5,974,057.13 652,825.76 70°20'9.956 N 148°45'36.11 W 7,500.00 22.13 54.00 7,461.04 182.45 208.51 5,974,079.64 652,854.74 70°20'10.171 N 148°45'35.25 W 7,600.00 23.17 54.19 7,553.32 205.03 239.70 5,974,102.86 652,885.46 70°20'10.393 N 148°45'34.34 W 7,700.00 24.05 54.19 7,644.95 228.47 272.18 5,974,126.94 652,917.45 70°20'10.624 N 148°45'33.39 W 7,800.00 24.47 54.10 7,736.12 252.53 305.48 5,974,151.68 652,950.26 70°20'10.860 N 148°45'32.42 W 7,900.00 24.77 54.10 7,827.03 276.96 339.23 5,974,176.79 652,983.50 70°20'11.101 N 148°45'31.43 W 8,000.00 24.47 54.19 7,917.94 301.36 372.99 5,974,201.87 653,016.75 70°20'11.341 N 148°45'30.45 W 8,100.00 24.57 55.00 8,008.92 325.41 406.82 5,974,226.60 653,050.08 70°20'11.577 N 148°45'29.46 W 8,200.00 24.93 55.00 8,099.73 349.42 441.11 5,974,251.30 653,083.88 70°20'11.813 N 148°45'28.46 W 8,300.00 24.97 55.39 8,190.40 373.50 475.75 5,974,276.08 653,118.01 70°20'12.050 N 148°45'27.44 W 8,400.00 24.63 56.50 8,281.18 396.99 510.50 5,974,300.27 653,152.28 70°20'12.281 N 148°45'26.43 W 8,500.00 24.43 57.10 8,372.15 419.72 545.24 5,974,323.70 653,186.54 70°20'12.505 N 148°45'25.41 W 8,600.00 23.63 59.60 8,463.49 441.10 579.89 5,974,345.77 653,220.75 70°20'12.715 N 148°45'24.40 W 8,700.00 23.77 59.80 8,555.05 461.37 614.59 5,974,366.75 653,255.03 70°20'12.914 N 148°45'23.39 W 8,800.00 23.80 59.00 8,646.56 481.90 649.31 5,974,387.99 653,289.31 70°20'13.116 N 148°45'22.37 W 8,900.00 24.10 58.80 8,737.95 502.87 684.06 5,974,409.66 653,323.64 70°20'13.322 N 148°45'21.36 W 9,000.00 24.07 58.80 8,829.24 524.01 718.97 5,974,431.50 653,358.10 70°20'13.530 N 148°45'20.34 W 9,069.01 24.01 58.72 8,892.27 538.59 743.01 5,974,446.56 653,381.84 70°20'13.674 N 148°45'19.64 W 9,099.16 27.33 67.90 8,919.45 544.39 754.67 5,974,452.59 653,393.38 70°20'13.731 N 148°45'19.30 W 11P 9,120.00 31.30 74.60 8,937.62 547.63 764.33 5,974,456.03 653,402.97 70°20'13.762 N 148°45 19.02 W KOP 9,154.21 36.43 61.54 8,966.06 554.84 781.86 5,974,463.60 653,420.35 70°20'13.833 N 148°45'18.50 W Interpolated Azimuth 9,185.15 41.42 52.23 8,990.14 565.50 798.05 5,974,474.59 653,436.32 70°20'13.938 N 148°45'18.03 W Interpolated Azimuth 9,215.15 46.55 44.95 9,011.73 579.31 813.61 5,974,488.70 653,451.59 70°20'14.074 N 148°45'17.58 W 9,244.91 52.46 39.68 9,031.06 596.05 828.80 5,974,505.76 653,466.43 70°20'14.239 N 148°45'17.13 W 9,275.41 60.66 36.87 9,047.85 616.03 844.52 5,974,526.05 653,481.75 70°20'14.435 N 148°45'16.67 W 9,305.37 70.02 36.02 9,060.34 637.91 860.67 5,974,548.25 653,497.45 70°20'14.650 N 148°45'16.20 W 9,335.36 78.85 35.82 9,068.38 661.29 877.60 5,974,571.96 653,513.90 70°20'14.880 N 148°45'15.71 W 9,365.11 89.42 36.71 9,071.42 685.11 895.08 5,974,596.14 653,530.89 70°20'15.114 N 148°45 15.20 W 9,395.55 94.12 35.75 9,070.48 709.65 913.06 5,974,621.03 653,548.36 70°20'15.356 N 148°45'14.67 W 9,425.20 96.96 34.74 9,067.61 733.75 930.09 5,974,645.47 653,564.90 70°20'15.593 N 148°45 14.17 W 9,455.20 96.77 31.09 9,064.03 758.75 946.27 5,974,670.79 653,580.56 70°20'15.839 N 148°45 13.70 W 9,485.41 96.86 28.83 9,060.44 784.73 961.25 5,974,697.08 653,595.01 70°20'16.094 N 148°45 13.26 W 12/9/2014 11:49:06AM Page 4 COMPASS 5000.1 Build 61 ri-- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-28-Slot 28 Project: Prudhoe Bay TVD Reference: ORKB @ 66.71usft Site: PB F Pad MD Reference: ORKB @ 66.71usft Well: F-28 North Reference: True Wellbore: F-28C Survey Calculation Method: Minimum Curvature Design: F-28C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,515.34 96.31 27.44 9,057.01 810.95 975.27 5,974,723.58 653,608.49 70°20'16.352 N 148'45'12.85 W 9,545.17 94.30 26.63 9,054.25 837.41 988.77 5,974,750.30 653,621.45 70°20'16.612 N 148°45'12.46 W 9,575.18 92.67 26.09 9,052.43 864.25 1,002.07 5,974,777.40 653,634.20 70°20'16.876 N 148°45'12.07 W 9,605.24 91.01 25.46 9,051.46 891.30 1,015.14 5,974,804.71 653,646.71 70°20'17.142 N 148°45 11.69 W 9,635.35 90.74 24.48 9,051.00 918.59 1,027.84 5,974,832.26 653,658.86 70°20'17.410 N 148°45'11.32 W 9,665.35 90.58 22.63 9,050.66 946.09 1,039.83 5,974,859.99 653,670.28 70°20'17.681 N 148°45'10.97 W 9,695.23 90.49 19.65 9,050.38 973.96 1,050.61 5,974,888.07 653,680.49 70°20'17.955 N 148°45'10.65 W 9,725.06 90.49 16.95 9,050.12 1,002.27 1,059.97 5,974,916.57 653,689.27 70°20'18.233 N 148°45'10.38 W 9,755.16 90.58 16.00 9,049.84 1,031.14 1,068.51 5,974,945.59 653,697.22 70°20'18.517 N 148°45'10.13 W 9,792.46 90.15 16.57 9,049.60 1,066.94 1,078.97 5,974,981.60 653,706.95 70°20'18.869 N 148°45'9.82 W 9,815.25 89.23 20.49 9,049.73 1,088.54 1,086.21 5,975,003.34 653,713.75 70°20'19.082 N 148°45'9.61 W 9,845.49 88.74 22.54 9,050.26 1,116.67 1,097.30 5,975,031.69 653,724.26 70°20'19.358 N 148°45'9.29 W 9,875.05 90.31 26.03 9,050.51 1,143.61 1,109.45 5,975,058.87 653,735.86 70°20'19.623 N 148°45'8.93 W 9,905.06 90.55 29.22 9,050.28 1,170.19 1,123.36 5,975,085.73 653,749.23 70°20'19.885 N 148°45'8.53 W 9,935.53 90.86 31.58 9,049.91 1,196.47 1,138.78 5,975,112.31 653,764.11 70°20'20.143 N 148°45'8.08 W 9,965.21 89.54 32.43 9,049.80 1,221.64 1,154.51 5,975,137.79 653,779.32 70°20'20.391 N 148°45'7.62 W 9,995.39 88.47 34.49 9,050.33 1,246.81 1,171.15 5,975,163.30 653,795.44 70°20'20.638 N 148°45'7.13 W 10,025.37 88.90 37.99 9,051.02 1,270.98 1,188.86 5,975,187.82 653,812.66 70°20'20.876 N 148°45'6.61 W 10,055.08 88.10 41.23 9,051.79 1,293.86 1,207.79 5,975,211.08 653,831.12 70°20'21.101 N 148°45'6.06 W 10,085.16 89.66 44.54 9,052.38 1,315.89 1,228.26 5,975,233.52 653,851.13 70°20'21.318 N 148°45'5.46 W 10,115.83 88.71 49.41 9,052.82 1,336.81 1,250.67 5,975,254.89 653,873.11 70°20'21.523 N 148°45'4.81 W 10,145.35 88.07 52.45 9,053.65 1,355.40 1,273.58 5,975,273.94 653,895.63 70°20'21.706 N 148°45'4.14 W 10,174.87 88.10 54.90 9,054.63 1,372.88 1,297.34 5,975,291.90 653,919.04 70°20'21.878 N 148°45'3.44 W 10,208.36 86.13 56.55 9,056.32 1,391.71 1,324.98 5,975,311.29 653,946.28 70°20'22.063 N 148°45'2.64 W 10,235.57 86.07 59.67 9,058.17 1,406.05 1,348.03 5,975,326.10 653,969.03 70°20'22.204 N 148°45'1.96 W 10,265.69 84.99 61.46 9,060.52 1,420.81 1,374.18 5,975,341.38 653,994.87 70°20'22.349 N 148°45'1.20 W 10,295.11 86.10 66.00 9,062.81 1,433.79 1,400.47 5,975,354.89 654,020.90 70°20'22.477 N 148°45'0.43 W 10,325.61 89.82 66.64 9,063.89 1,446.03 1,428.38 5,975,367.69 654,048.55 70°20'22.597 N 148°44'59.62 W 10,355.37 91.54 65.09 9,063.54 1,458.19 1,455.54 5,975,380.41 654,075.45 70°20'22.717 N 148°44'58.82 W 10,385.13 92.89 62.73 9,062.39 1,471.27 1,482.24 5,975,394.03 654,101.88 70°20'22.845 N 148°44'58.04 W 10,416.09 97.11 64.87 9,059.69 1,484.89 1,509.91 5,975,408.20 654,129.26 70°20'22.979 N 148°44'57.23 W 10,444.87 94.49 62.69 9,056.78 1,497.54 1,535.59 5,975,421.37 654,154.68 70°20'23.103 N 148°44'56.48 W 10,475.31 92.15 64.24 9,055.02 1,511.11 1,562.77 5,975,435.49 654,181.58 70°20'23.237 N 148°44'55.69 W 10,505.69 89.75 65.72 9,054.51 1,523.96 1,590.30 5,975,448.90 654,208.83 70°20'23.363 N 148°44'54.89 W 10,535.31 87.08 66.28 9,055.33 1,536.00 1,617.34 5,975,461.48 654,235.63 70°20'23.482 N 148°44'54.10 W 10,565.23 89.45 70.35 9,056.24 1,547.04 1,645.13 5,975,473.09 654,263.18 70°20'23.590 N 148°44'53.28 W 10,595.42 89.11 73.39 9,056.62 1,556.44 1,673.81 5,975,483.07 654,291.66 70°20'23.682 N 148°44'52.45 W 10,625.47 88.96 76.60 9,057.13 1,564.21 1,702.83 5,975,491.43 654,320.51 70°20'23.759 N 148°44'51.60 W 10,655.35 90.09 79.85 9,057.37 1,570.31 1,732.07 5,975,498.12 654,349.63 70°20'23.819 N 148°44'50.74 W 10,685.36 91.23 83.60 9,057.03 1,574.63 1,761.76 5,975,503.05 654,379.22 70°20'23.861 N 148°44'49.88 W 10,715.57 89.48 84.55 9,056.84 1,577.75 1,791.81 5,975,506.77 654,409.19 70°20'23.892 N 148°44'49.00 W 10,745.47 91.13 87.99 9,056.68 1,579.69 1,821.64 5,975,509.33 654,438.98 70°20'23.911 N 148°44'48.13 W 10,775.36 91.07 90.57 9,056.11 1,580.07 1,851.52 5,975,510.31 654,468.84 70°20'23.914 N 148°44'47.26 W 10,805.64 91.23 93.81 9,055.50 1,578.91 1,881.77 5,975,509.77 654,499.10 70°20'23.903 N 148°44'46.37 W 10,835.44 89.29 91.15 9,055.36 1,577.62 1,911.54 5,975,509.09 654,528.89 70°20'23.890 N 148°44'45.50 W 10,865.51 91.50 89.06 9,055.16 1,577.57 1,941.60 5,975,509.64 654,558.95 70°20'23.890 N 148°44'44.62 W 10,895.66 89.48 85.57 9,054.90 1,578.98 1,971.71 5,975,511.67 654,589.02 70°20'23.903 N 148°44'43.74 W 10,925.47 90.46 81.83 9,054.91 1,582.25 2,001.34 5,975,515.54 654,618.57 70°20'23.936 N 148°44'42.88 W 10,955.44 90.92 77.85 9,054.55 1,587.53 2,030.83 5,975,521.42 654,647.95 70°20'23.987 N 148°44'42.02 W 10,985.41 92.12 75.13 9,053.76 1,594.53 2,059.95 5,975,529.01 654,676.92 70°20'24.056 N 148°44'41.17 W , 11,016.71 91.54 72.42 9,052.76 1,603.27 2,089.99 5,975,538.36 654,706.77 70°20'24.142 N 148°44'40.29 W 11,045.99 90.92 71.84 9,052.13 1,612.25 2,117.85 5,975,547.91 654,734.44 70°20'24.230 N 148°44'39.48 W 11,075.33 88.50 69.45 9,052.28 1,621.98 2,145.53 5,975,558.19 654,761.91 70°20'24.326 N 148°44'38.67 W 11,105.36 88.71 67.52 9,053.01 1,632.99 2,173.46 5,975,569.77 654,789.61 70°20'24.434 N 148°44'37.85 W 11,135.20 89.60 65.38 9,053.45 1,644.91 2,200.81 5,975,582.24 654,816.71 70°20'24.551 N 148°44'37.05 W 12/9/2014 11:49:06AM Page 5 COMPASS 5000.1 Build 61 rail 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-28-Slot 28 Project: Prudhoe Bay ND Reference: ORKB @ 66.71usft Site: PB F Pad MD Reference: ORKB @ 66.71usft Well: F-28 North Reference: True Wellbore: F-28C Survey Calculation Method: Minimum Curvature Design: F-28C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 11,165.28 88.83 63.81 9,053.86 1,657.81 2,227.97 5,975,595.69 654,843.61 70°20'24.678 N 148°44'36.26 W 11,195.34 88.10 61.90 9,054.67 1,671.52 2,254.71 5,975,609.94 654,870.06 70°20'24.813 N 148°44'35.48 W 11,225.31 88.59 60.45 9,055.53 1,685.96 2,280.96 5,975,624.91 654,896.00 70°20'24.955 N 148°44'34.71 W 11,253.76 90.95 63.18 9,055.65 1,699.40 2,306.03 5,975,638.86 654,920.79 70°20'25.087 N 148°44'33.98 W 11,285.22 92.06 66.74 9,054.82 1,712.71 2,334.52 5,975,652.74 654,949.00 70°20'25.218 N 148°44'33.15 W 11,315.35 91.97 69.94 9,053.76 1,723.82 2,362.50 5,975,664.42 654,976.75 70°20'25.327 N 148°44'32.33 W 11,346.25 89.82 73.10 9,053.28 1,733.61 2,391.80 5,975,674.81 655,005.84 70°20'25.423 N 148°44'31.47 W 11,374.96 87.76 75.06 9,053.88 1,741.48 2,419.40 5,975,683.24 655,033.27 70°20'25.500 N 148°44'30.67 W 11,405.52 88.19 77.92 9,054.96 1,748.62 2,449.09 5,975,690.97 655,062.81 70°20'25.570 N 148°44'29.80 W 11,435.42 91.26 81.07 9,055.11 1,754.07 2,478.48 5,975,697.02 655,092.08 70°20'25.624 N 148°44'28.94 W 11,465.56 90.61 85.01 9,054.62 1,757.72 2,508.39 5,975,701.28 655,121.91 70°20'25.660 N 148°44'28.07 W 11,495.36 88.59 88.03 9,054.82 1,759.53 2,538.13 5,975,703.69 655,151.60 70°20'25.677 N 148°44'27.20 W 11,525.29 90.61 89.54 9,055.03 1,760.16 2,568.05 5,975,704.94 655,181.50 70°20'25.684 N 148°44'26.32 W 11,555.32 91.63 88.93 9,054.45 1,760.56 2,598.07 5,975,705.95 655,211.50 70°20'25.687 N 148°44'25.45 W 11,585.39 92.58 89.75 9,053.34 1,760.91 2,628.12 5,975,706.91 655,241.54 70°20'25.691 N 148°44'24.57 W 11,615.39 93.99 92.98 9,051.62 1,760.20 2,658.05 5,975,706.80 655,271.48 70°20'25.684 N 148°44'23.70 W 11,645.43 94.79 91.11 9,049.32 1,759.13 2,687.98 5,975,706.34 655,301.42 70°20'25.673 N 148°44'22.82 W 11,675.52 92.83 90.76 9,047.32 1,758.64 2,718.00 5,975,706.46 655,331.44 70°20'25.668 N 148°44'21.94 W 11,705.42 90.37 90.73 9,046.49 1,758.25 2,747.89 5,975,706.68 655,361.33 70°20'25.664 N 148°44'21.07 W 11,735.52 89.45 89.48 9,046.54 1,758.19 2,777.98 5,975,707.24 655,391.42 70°20'25.663 N 148°44'20.19 W 11,765.46 88.71 86.88 9,047.02 1,759.14 2,807.90 5,975,708.80 655,421.31 70°20'25.673 N 148°44'19.32 W 11,795.45 91.84 85.75 9,046.87 1,761.07 2,837.83 5,975,711.34 655,451.19 70°20'25.692 N 148°44'18.44 W 11,825.48 90.67 83.65 9,046.21 1,763.84 2,867.72 5,975,714.72 655,481.01 70°20'25.719 N 148°44'17.57 W 11,855.54 89.85 81.74 9,046.08 1,767.67 2,897.53 5,975,719.14 655,510.74 70°20'25.756 N 148°44'16.70 W 11,885.58 89.63 79.22 9,046.21 1,772.63 2,927.16 5,975,724.71 655,540.25 70°20'25.805 N 148°44'15.83 W 11,915.35 89.91 77.04 9,046.33 1,778.76 2,956.29 5,975,731.43 655,569.25 70°20'25.865 N 148°44'14.98 W 11,945.60 90.09 74.60 9,046.33 1,786.17 2,985.61 5,975,739.43 655,598.42 70°20'25.938 N 148°44'14.13 W 11,975.49 89.75 72.55 9,046.38 1,794.62 3,014.28 5,975,748.46 655,626.91 70°20'26.021 N 148°44'13.29 W 12,005.43 90.21 70.52 9,046.39 1,804.10 3,042.68 5,975,758.52 655,655.10 70°20'26.114 N 148°44'12.46 W 12,035.32 90.55 68.57 9,046.19 1,814.54 3,070.68 5,975,769.53 655,682.89 70°20'26.217 N 148°44'11.64 W 12,065.37 91.01 65.85 9,045.78 1,826.18 3,098.38 5,975,781.73 655,710.34 70°20'26.331 N 148°44'10.83 W 12,106.07 89.82 62.65 9,045.48 1,843.86 3,135.03 5,975,800.15 655,746.62 70°20'26.505 N 148°44'9.76 W 12,125.73 90.28 62.24 9,045.47 1,852.96 3,152.46 5,975,809.60 655,763.86 70°20'26.594 N 148°44'9.25 W 12,155.42 89.20 61.02 9,045.60 1,867.06 3,178.59 5,975,824.23 655,789.69 70°20'26.733 N 148°44'8.49 W 12,171.87 88.00 59.16 9,046.00 1,875.26 3,192.84 5,975,832.72 655,803.78 70°20'26.813 N 148°44'8.07 W 12,201.00 88.00 59.16 9,047.02 1,890.19 3,217.84 5,975,848.15 655,828.46 70°20'26.960 N 148°44'7.34 W Projection to TD 12/9/2014 11:49:06AM Page 6 COMPASS 5000.1 Build 61 . 1 41 72 25689 RECEIVED APR 10 2015 bp AOGCC North America - ALASKA - BP Prudhoe Bay PB F Pad F-28 - Slot 28 500292164900 F-28C Design: F-28C Survey Report - Geographic 09 December, 2014 BAKER HUGHES 1/11 bp Survey Report-Geographic BAKER '" HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-28-Slot 28 Project: Prudhoe Bay TVD Reference: ORKB @ 66.71 usft Site: PB F Pad MD Reference: ORKB @ 66 71 usft Well: F-28 North Reference: True Wellbore: F-28C Survey Calculation Method: Minimum Curvature Design: F-28C Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB F Pad,TR-11-13 Site Position: Northing: 5,972,527.29 usft Latitude: 70°19'55.283 N From: Map Easting: 650,960.70 usft Longitude: 148°46'31.47 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.15 ° Well F-28 API No. 500292164900 Well Position +N/-S 0.00 usft Northing: 5,973,893.00 usft Latitude: 70°20'8.377 N +E/-W 0.00 usft Easting: 652,650.00 usft Longitude: 148°45 41.34 W Position Uncertainty 0.00 usft Wellhead Elevation: 37.86 usft Ground Level: 36.46 usft Wellbore F-28C API no. 500292164903 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) 1°) (nT) BGG M2014 11/30/2014 19.52 81.02 57,597 Design F-28C Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,099.16 Vertical Section: Depth From(TVD) +N/-S +El-W Direction (usft) (usft) (usft) r) 31.21 000 000 5957 Survey Program Date: 12/9/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 9,000.01 1 :Sperry-Sun BOSS gyro multi(F-28) BOSS-GYRO Sperry-Sun BOSS gyro multishot 9,069.01 9,099.16 MWD(F-28A) MWD MWD-Standard 9,120.00 12,171.87 MWD(F-28C) MWD MWD-Standard 12/9/2014 11:49:06AM Page 2 COMPASS 5000.1 Build 61 1 F' :b P Survey Report-Geographic BAKER '0'i HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-28-Slot 28 Project: Prudhoe Bay TVD Reference: ORKB @ 66.71usft Site: PB F Pad MD Reference: ORKB @ 66.71usft Well: F-28 North Reference: True Wellbore: F-28C Survey Calculation Method: Minimum Curvature Design: F-28C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 31.21 0.00 0.00 31.21 0.00 0.00 5,973,893.00 652,650.00 70°20'8.377 N 148°45'41.34 W 100.00 1.02 97.31 100.00 -0.08 0.61 5,973,892.94 652,650.61 70°20'8.376 N 148°45'41.32 W 200.00 1.27 94.40 199.98 -0.28 2.60 5,973,892.78 652,652.60 70°20'8.374 N 148°45'41.26 W 300.00 1.02 106.81 299.96 -0.62 4.55 5,973,892.47 652,654.56 70°20'8.371 N 148°45'41.21 W 400.00 1.25 113.61 399.94 -1.31 6.40 5,973,891.82 652,656.43 70°20'8.364 N 148°45'41.15 W 500.00 0.87 133.00 499.92 -2.27 7.96 5,973,890.90 652,658.00 70°20'8.355 N 148°45'41.11 W 600.00 1.10 121.61 599.91 -3.29 9.33 5,973,889.90 652,659.39 70°20'8.345 N 148°45'41.07 W 700.00 0.88 133.00 699.89 -4.32 10.71 5,973,888.90 652,660.79 70°20'8.334 N 148°45'41.03 W 800.00 0.92 125.31 799.88 -5.30 11.93 5,973,887.94 652,662.03 70°20'8.325 N 148°45 40.99 W 900.00 0.75 119.31 899.87 -6.09 13.15 5,973,887.18 652,663.27 70°20'8.317 N 148°45 40.95 W 1,000.00 0.85 89.10 999.86 -6.40 14.46 5,973,886.90 652,664.59 70°20'8.314 N 148°45'40.92 W 1,100.00 0.78 86.80 1,099.85 -6.35 15.89 5,973,886.98 652,666.01 70°20'8.314 N 148°45'40.87 W 1,200.00 0.68 69.39 1,199.84 -6.10 17.12 5,973,887.25 652,667.24 70°20'8.317 N 148°45'40.84 W 1,300.00 0.47 39.00 1,299.83 -5.57 17.93 5,973,887.80 652,668.04 70°20'8.322 N 148°45'40.81 W 1,400.00 1.22 316.00 1,399.83 -4.49 17.45 5,973,888.87 652,667.54 70°20'8.333 N 148°45'40.83 W 1,500.00 2.23 327.31 1,499.78 -2.08 15.66 5,973,891.24 652,665.70 70°20'8.356 N 148°45'40.88 W 1,600.00 2.20 330.50 1,599.70 1.22 13.67 5,973,894.50 652,663.64 70°20'8.389 N 148°45'40.94 W 1,700.00 1.50 334.31 1,699.65 4.07 12.15 5,973,897.32 652,662.07 70°20'8.417 N 148°45 40.98 W 1,800.00 1.02 334.70 1,799.63 6.06 11.21 5,973,899.28 652,661.08 70°20'8.436 N 148°45'41.01 W 1,900.00 0.45 8.89 1,899.62 7.25 10.89 5,973,900.47 652,660.74 70°20'8.448 N 148°45 41.02 W 2,000.00 0.47 356.40 1,999.62 8.05 10.92 5,973,901.27 652,660.75 70°20'8.456 N 148°45'41.02 W 2,100.00 0.25 39.69 2,099.61 8.63 11.04 5,973,901.85 652,660.86 70°20'8.462 N 148°45 41.02 W 2,200.00 0.15 84.89 2,199.61 8.80 11.31 5,973,902.03 652,661.12 70°20'8.464 N 148°45'41.01 W 2,300.00 0.25 110.11 2,299.61 8.74 11.64 5,973,901.98 652,661.46 70°20'8.463 N 148°45'41.00 W 2,400.00 0.57 125.40 2,399.61 8.38 12.25 5,973,901.63 652,662.08 70°20'8.459 N 148°45'40.98 W 2,500.00 0.72 129.61 2,499.60 7.69 13.14 5,973,900.96 652,662.98 70°20'8.453 N 148°45'40.95 W 2,600.00 0.72 129.50 2,599.60 6.89 14.11 5,973,900.18 652,663.96 70°20'8.445 N 148°45'40.93 W 2,700.00 0.75 118.31 2,699.59 6.18 15.17 5,973,899.49 652,665.04 70°20'8.438 N 148°45'40.90 W 2,800.00 0.90 116.70 2,799.58 5.52 16.45 5,973,898.85 652,666.33 70°20'8.431 N 148°45'40.86 W 2,900.00 0.97 116.31 2,899.56 4.79 17.91 5,973,898.15 652,667.81 70°20'8.424 N 148°45'40.82 W 3,000.00 1.18 117.90 2,999.55 3.93 19.58 5,973,897.33 652,669.49 70°20'8.416 N 148°45'40.77 W 3,100.00 1.30 117.40 3,099.52 2.93 21.49 5,973,896.36 652,671.43 70°20'8.406 N 148°45 40.71 W 3,200.00 1.32 123.70 3,199.50 1.77 23.46 5,973,895.24 652,673.42 70°20'8.394 N 148°45 40.65 W 3,300.00 1.15 134.00 3,299.47 0.43 25.14 5,973,893.94 652,675.12 70°20'8.381 N 148°45'40.60 W 3,400.00 0.75 154.70 3,399.46 -0.86 26.14 5,973,892.67 652,676.15 70°20'8.368 N 148°45'40.57 W 3,500.00 0.78 161.81 3,499.45 -2.10 26.63 5,973,891.45 652,676.67 70°20'8.356 N 148°45 40.56 W 3,600.00 0.87 148.50 3,599.44 -3.39 27.24 5,973,890.16 652,677.30 70°20'8.344 N 148°45 40.54 W 3,700.00 0.67 163.40 3,699.43 -4.60 27.81 5,973,888.97 652,677.89 70°20'8.332 N 148°45'40.53 W 3,800.00 0.63 161.31 3,799.43 -5.68 28.15 5,973,887.90 652,678.26 70°20'8.321 N 148°45 40.52 W 3,900.00 0.62 179.40 3,899.42 -6.74 28.33 5,973,886.84 652,678.46 70°20'8.311 N 148°45 40.51 W 4,000.00 0.62 178.31 3,999.41 -7.82 28.35 5,973,885.76 652,678.50 70°20'8.300 N 148°45 40.51 W 4,100.00 0.55 187.30 4,099.41 -8.84 28.31 5,973,884.74 652,678.48 70°20'8.290 N 148°45'40.51 W 4,200.00 0.62 191.30 4,199.40 -9.85 28.14 5,973,883.73 652,678.33 70°20'8.280 N 148°45'40.52 W 4,300.00 0.55 190.80 4,299.40 -10.85 27.94 5,973,882.72 652,678.16 70°20'8.270 N 148°45'40.52 W 4,400.00 0.45 208.89 4,399.39 -11.66 27.67 5,973,881.90 652,677.89 70°20'8.262 N 148°45'40.53 W 4,500.00 0.45 210.10 4,499.39 -12.35 27.28 5,973,881.21 652,677.52 70°20'8.255 N 148°45'40.54 W 4,600.00 0.25 225.50 4,599.39 -12.84 26.93 5,973,880.71 652,677.18 70°20'8.251 N 148°45'40.55 W 4,700.00 0.12 248.69 4,699.39 -13.03 26.67 5,973,880.52 652,676.93 70°20'8.249 N 148°45 40.56 W 4,800.00 0.40 88.00 4,799.39 -13.06 26.92 5,973,880.49 652,677.18 70°20'8.248 N 148°45 40.55 W 4,900.00 0.22 97.90 4,899.39 -13.07 27.46 5,973,880.49 652,677.72 70°20'8.248 N 148°45'40.54 W 5,000.00 0.37 124.31 4,999.39 -13.28 27.92 5,973,880.29 652,678.18 70°20'8.246 N 148°45'40.52 W 5,100.00 0.57 251.89 5,099.38 -13.62 27.71 5,973,879.95 652,677.98 70°20'8.243 N 148°45'40.53 W 5,200.00 0.75 274.81 5,199.38 -13.72 26.59 5,973,879.83 652,676.86 70°20'8.242 N 148°45'40.56 W 5,300.00 1.35 315.11 5,299.36 -12.83 25.11 5,973,880.69 652,675.36 70°20'8.251 N 148°45 40.61 W 5,400.00 1.87 328.00 5,399.32 -10.61 23.41 5,973,882.87 652,673.62 70°20'8.273 N 148°45'40.65 W 12/9/2014 11:49:06AM Page 3 COMPASS 5000.1 Build 61 F' bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-28-Slot 28 Project: Prudhoe Bay TVD Reference: ORKB @ 66.71 usft Site: PB F Pad MD Reference: ORKB @ 66.71usft Well: F-28 North Reference: True Wellbore: F-28C Survey Calculation Method: Minimum Curvature Design: F-28C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +EI-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 5,500.00 1.88 334.31 5,499.27 -7.75 21.83 5,973,885.70 652,671.98 70°20'8.301 N 148°45'40.70 W 5,600.00 2.08 339.00 5,599.21 -4.57 20.47 5,973,888.84 652,670.56 70°20'8.332 N 148°45'40.74 W 5,700.00 1.93 349.31 5,699.15 -1.23 19.51 5,973,892.17 652,669.53 70°20'8.365 N 148°45'40.77 W 5,800.00 1.60 347.90 5,799.10 1.79 18.90 5,973,895.18 652,668.86 70°20'8.395 N 148°45'40.79 W 5,900.00 1.10 344.90 5,899.07 4.09 18.36 5,973,897.46 652,668.27 70°20'8.417 N 148°45'40.80 W 6,000.00 0.62 340.50 5,999.06 5.52 17.93 5,973,898.89 652,667.81 70°20'8.431 N 148°45'40.81 W 6,100.00 0.75 332.90 6,099.05 6.62 17.45 5,973,899.97 652,667.31 70°20'8.442 N 148°45'40.83 W 6,200.00 0.62 338.61 6,199.05 7.70 16.96 5,973,901.05 652,666.80 70°20'8.453 N 148°45'40.84 W 6,300.00 0.45 332.31 6,299.04 8.55 16.58 5,973,901.89 652,666.40 70°20'8.461 N 148°45'40.85 W 6,400.00 0.50 333.20 6,399.04 9.29 16.20 5,973,902.62 652,666.00 70°20'8.468 N 148°45'40.87 W 6,500.00 2.02 34.39 6,499.01 11.13 17.00 5,973,904.48 652,666.77 70°20'8.486 N 148°45'40.84 W 6,600.00 6.15 45.00 6,598.74 16.38 21.78 5,973,909.82 652,671.44 70°20'8.538 N 148°45'40.70 W 6,700.00 11.12 45.00 6,697.58 26.99 32.40 5,973,920.64 652,681.84 70°20'8.642 N 148°45'40.39 W 6,800.00 13.47 44.00 6,795.27 42.19 47.31 5,973,936.14 652,696.43 70°20'8.792 N 148°45'39.96 W 6,900.00 14.62 45.80 6,892.28 59.37 64.45 5,973,953.66 652,713.22 70°20'8.961 N 148°45'39.46 W 7,000.00 15.77 46.19 6,988.79 77.57 83.30 5,973,972.25 652,731.70 70°20'9.140 N 148°45'38.91 W 7,100.00 17.02 47.50 7,084.72 96.87 103.90 5,973,991.96 652,751.90 70°20'9.330 N 148°45'38.30 W 7,200.00 18.72 48.80 7,179.89 117.33 126.76 5,974,012.88 652,774.34 70°20'9.531 N 148°45'37.64 W 7,300.00 19.85 50.10 7,274.28 138.79 151.86 5,974,034.84 652,799.00 70°20'9.742 N 148°45'36.90 W 7,400.00 20.93 52.60 7,368.01 160.53 179.08 5,974,057.13 652,825.76 70°20'9.956 N 148°45'36.11 W 7,500.00 22.13 54.00 7,461.04 182.45 208.51 5,974,079.64 652,854.74 70°20'10.171 N 148°45'35.25 W 7,600.00 23.17 54.19 7,553.32 205.03 239.70 5,974,102.86 652,885.46 70°20'10.393 N 148°45'34.34 W 7,700.00 24.05 54.19 7,644.95 228.47 272.18 5,974,126.94 652,917.45 70°20'10.624 N 148°45'33.39 W 7,800.00 24.47 54.10 7,736.12 252.53 305.48 5,974,151.68 652,950.26 70°20'10.860 N 148°45'32.42 W 7,900.00 24.77 54.10 7,827.03 276.96 339.23 5,974,176.79 652,983.50 70°20'11.101 N 148°45'31.43 W 8,000.00 24.47 54.19 7,917.94 301.36 372.99 5,974,201.87 653,016.75 70°20'11.341 N 148°45'30.45 W 8,100.00 24.57 55.00 8,008.92 325.41 406.82 5,974,226.60 653,050.08 70°20'11.577 N 148°45'29.46 W 8,200.00 24.93 55.00 8,099.73 349.42 441.11 5,974,251.30 653,083.88 70°20'11.813 N 148°45'28.46 W 8,300.00 24.97 55.39 8,190.40 373.50 475.75 5,974,276.08 653,118.01 70°20'12.050 N 148°45'27.44 W 8,400.00 24.63 56.50 8,281.18 396.99 510.50 5,974,300.27 653,152.28 70°20'12.281 N 148°45'26.43 W 8,500.00 24.43 57.10 8,372.15 419.72 545.24 5,974,323.70 653,186.54 70°20'12.505 N 148°45'25.41 W 8,600.00 23.63 59.60 8,463.49 441.10 579.89 5,974,345.77 653,220.75 70°20'12.715 N 148°45'24.40 W 8,700.00 23.77 59.80 8,555.05 461.37 614.59 5,974,366.75 653,255.03 70°20'12.914 N 148°45'23.39 W 8,800.00 23.80 59.00 8,646.56 481.90 649.31 5,974,387.99 653,289.31 70°20'13.116 N 148°45'22.37 W 8,900.00 24.10 58.80 8,737.95 502.87 684.06 5,974,409.66 653,323.64 70°20'13.322 N 148°45'21.36 W 9,000.00 24.07 58.80 8,829.24 524.01 718.97 5,974,431.50 653,358.10 70°20'13.530 N 148°45'20.34 W 9,069.01 24.01 58.72 8,892.27 538.59 743.01 5,974,446.56 653,381.84 70°20'13.674 N 148°45'19.64 W 9,099.16 27.33 67.90 8,919.45 544.39 754.67 5,974,452.59 653,393.38 70°20'13.731 N 148°45 19.30 W TIP 9,120.00 31.30 74.60 8,937.62 547.63 764.33 5,974,456.03 653,402.97 70°20'13.762 N 148°45'19.02 W KOP 9,154.21 36.43 61.54 8,966.06 554.84 781.86 5,974,463.60 653,420.35 70°20'13.833 N 148°45'18.50 W Interpolated Azimuth 9,185.15 41.42 52.23 8,990.14 565.50 798.05 5,974,474.59 653,436.32 70°20'13.938 N 148°45'18.03 W Interpolated Azimuth 9,215.15 46.55 44.95 9,011.73 579.31 813.61 5,974,488.70 653,451.59 70°20'14.074 N 148°45 17.58 W 9,244.91 52.46 39.68 9,031.06 596.05 828.80 5,974,505.76 653,466.43 70°20'14.239 N 148°45 17.13 W 9,275.41 60.66 36.87 9,047.85 616.03 844.52 5,974,526.05 653,481.75 70°20'14.435 N 148°45 16.67 W 9,305.37 70.02 36.02 9,060.34 637.91 860.67 5,974,548.25 653,497.45 70°20'14.650 N 148°45 16.20 W 9,335.36 78.85 35.82 9,068.38 661.29 877.60 5,974,571.96 653,513.90 70°20'14.880 N 148°45'15.71 W 9,365.11 89.42 36.71 9,071.42 685.11 895.08 5,974,596.14 653,530.89 70°20'15.114 N 148°45 15.20 W 9,395.55 94.12 35.75 9,070.48 709.65 913.06 5,974,621.03 653,548.36 70°20'15.356 N 148°45'14.67 W 9,425.20 96.96 34.74 9,067.61 733.75 930.09 5,974,645.47 653,564.90 70°20'15.593 N 148°45 14.17 W 9,455.20 96.77 31.09 9,064.03 758.75 946.27 5,974,670.79 653,580.56 70°20'15.839 N 148°45'13.70 W 9,485.41 96.86 28.83 9,060.44 784.73 961.25 5,974,697.08 653,595.01 70°20'16.094 N 148°45'13.26 W 12/9/2014 11:49:06AM Page 4 COMPASS 5000.1 Build 61 WI- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-28-Slot 28 Project: Prudhoe Bay ND Reference: ORKB @ 66.71 usft Site: PB F Pad MD Reference: ORKB @ 66.71usft Well: F-28 North Reference: True Wellbore: F-28C Survey Calculation Method: Minimum Curvature Design: F-28C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,515.34 96.31 27.44 9,057.01 810.95 975.27 5,974,723.58 653,608.49 70°20'16.352 N 148°45'12.85 W 9,545.17 94.30 26.63 9,054.25 837.41 988.77 5,974,750.30 653,621.45 70°20'16.612 N 148°45'12.46 W 9,575.18 92.67 26.09 9,052.43 864.25 1,002.07 5,974,777.40 653,634.20 70°20'16.876 N 148°45'12.07 W 9,605.24 91.01 25.46 9,051.46 891.30 1,015.14 5,974,804.71 653,646.71 70°20'17.142 N 148°45 11.69 W 9,635.35 90.74 24.48 9,051.00 918.59 1,027.84 5,974,832.26 653,658.86 70°20'17.410 N 148°45 11.32 W 9,665.35 90.58 22.63 9,050.66 946.09 1,039.83 5,974,859.99 653,670.28 70°20'17.681 N 148°45'10.97 W 9,695.23 90.49 19.65 9,050.38 973.96 1,050.61 5,974,888.07 653,680.49 70°20'17.955 N 148°45'10.65 W 9,725.06 90.49 16.95 9,050.12 1,002.27 1,059.97 5,974,916.57 653,689.27 70°20'18.233 N 148°45'10.38 W ' 9,755.16 90.58 16.00 9,049.84 1,031.14 1,068.51 5,974,945.59 653,697.22 70°20'18.517 N 148°45'10.13 W 9,792.46 90.15 16.57 9,049.60 1,066.94 1,078.97 5,974,981.60 653,706.95 70°20'18.869 N 148°45'9.82 W 9,815.25 89.23 20.49 9,049.73 1,088.54 1,086.21 5,975,003.34 653,713.75 70°20'19.082 N 148°45'9.61 W 9,845.49 88.74 22.54 9,050.26 1,116.67 1,097.30 5,975,031.69 653,724.26 70°20'19.358 N 148°45'9.29 W 9,875.05 90.31 26.03 9,050.51 1,143.61 1,109.45 5,975,058.87 653,735.86 70°20'19.623 N 148°45'8.93 W 9,905.06 90.55 29.22 9,050.28 1,170.19 1,123.36 5,975,085.73 653,749.23 70°20'19.885 N 148°45'8.53 W 9,935.53 90.86 31.58 9,049.91 1,196.47 1,138.78 5,975,112.31 653,764.11 70°20'20.143 N 148°45'8.08 W 9,965.21 89.54 32.43 9,049.80 1,221.64 1,154.51 5,975,137.79 653,779.32 70°20'20.391 N 148°45'7.62 W 9,995.39 88.47 34.49 9,050.33 1,246.81 1,171.15 5,975,163.30 653,795.44 70°20'20.638 N 148°45'7.13 W 10,025.37 88.90 37.99 9,051.02 1,270.98 1,188.86 5,975,187.82 653,812.66 70°20'20.876 N 148°45'6.61 W 10,055.08 88.10 41.23 9,051.79 1,293.86 1,207.79 5,975,211.08 653,831.12 70°20'21.101 N 148°45'6.06 W 10,085.16 89.66 44.54 9,052.38 1,315.89 1,228.26 5,975,233.52 653,851.13 70°20'21.318 N 148°45'5.46 W 10,115.83 88.71 49.41 9,052.82 1,336.81 1,250.67 5,975,254.89 653,873.11 70°20'21.523 N 148°45'4.81 W 10,145.35 88.07 52.45 9,053.65 1,355.40 1,273.58 5,975,273.94 653,895.63 70°20'21.706 N 148°45'4.14 W 10,174.87 88.10 54.90 9,054.63 1,372.88 1,297.34 5,975,291.90 653,919.04 70°20'21.878 N 148°45'3.44 W 10,208.36 86.13 56.55 9,056.32 1,391.71 1,324.98 5,975,311.29 653,946.28 70°20'22.063 N 148°45'2.64 W 10,235.57 86.07 59.67 9,058.17 1,406.05 1,348.03 5,975,326.10 653,969.03 70°20'22.204 N 148°45'1.96 W 10,265.69 84.99 61.46 9,060.52 1,420.81 1,374.18 5,975,341.38 653,994.87 70°20'22.349 N 148°45'1.20 W 10,295.11 86.10 66.00 9,062.81 1,433.79 1,400.47 5,975,354.89 654,020.90 70°20'22.477 N 148°45'0.43 W 10,325.61 89.82 66.64 9,063.89 1,446.03 1,428.38 5,975,367.69 654,048.55 70°20'22.597 N 148°44'59.62 W 10,355.37 91.54 65.09 9,063.54 1,458.19 1,455.54 5,975,380.41 654,075.45 70°20'22.717 N 148°44'58.82 W 10,385.13 92.89 62.73 9,062.39 1,471.27 1,482.24 5,975,394.03 654,101.88 70°20'22.845 N 148°44'58.04 W 10,416.09 97.11 64.87 9,059.69 1,484.89 1,509.91 5,975,408.20 654,129.26 70°20'22.979 N 148°44'57.23 W 10,444.87 94.49 62.69 9,056.78 1,497.54 1,535.59 5,975,421.37 654,154.68 70°20'23.103 N 148°44'56.48 W 10,475.31 92.15 64.24 9,055.02 1,511.11 1,562.77 5,975,435.49 654,181.58 70°20'23.237 N 148°44'55.69 W 10,505.69 89.75 65.72 9,054.51 1,523.96 1,590.30 5,975,448.90 654,208.83 70°20'23.363 N 148°44'54.89 W 10,535.31 87.08 66.28 9,055.33 1,536.00 1,617.34 5,975,461.48 654,235.63 70°20'23.482 N 148°44'54.10 W 10,565.23 89.45 70.35 9,056.24 1,547.04 1,645.13 5,975,473.09 654,263.18 70°20'23.590 N 148°44'53.28 W 10,595.42 89.11 73.39 9,056.62 1,556.44 1,673.81 5,975,483.07 654,291.66 70°20'23.682 N 148°44'52.45 W 10,625.47 88.96 76.60 9,057.13 1,564.21 1,702.83 5,975,491.43 654,320.51 70°20'23.759 N 148°44'51.60 W 10,655.35 90.09 79.85 9,057.37 1,570.31 1,732.07 5,975,498.12 654,349.63 70°20'23.819 N 148°44'50.74 W 10,685.36 91.23 83.60 9,057.03 1,574.63 1,761.76 5,975,503.05 654,379.22 70°20'23.861 N 148°44'49.88 W 10,715.57 89.48 84.55 9,056.84 1,577.75 1,791.81 5,975,506.77 654,409.19 70°20'23.892 N 148°44'49.00 W 10,745.47 91.13 87.99 9,056.68 1,579.69 1,821.64 5,975,509.33 654,438.98 70°20'23.911 N 148°44'48.13 W 10,775.36 91.07 90.57 9,056.11 1,580.07 1,851.52 5,975,510.31 654,468.84 70°20'23.914 N 148°44'47.26 W 10,805.64 91.23 93.81 9,055.50 1,578.91 1,881.77 5,975,509.77 654,499.10 70°20'23.903 N 148°44'46.37 W 10,835.44 89.29 91.15 9,055.36 1,577.62 1,911.54 5,975,509.09 654,528.89 70°20'23.890 N 148°44'45.50 W 10,865.51 91.50 89.06 9,055.16 1,577.57 1,941.60 5,975,509.64 654,558.95 70°20'23.890 N 148°44'44.62 W 10,895.66 89.48 85.57 9,054.90 1,578.98 1,971.71 5,975,511.67 654,589.02 70°20'23.903 N 148°44'43.74 W 10,925.47 90.46 81.83 9,054.91 1,582.25 2,001.34 5,975,515.54 654,618.57 70°20'23.936 N 148°44'42.88 W 10,955.44 90.92 77.85 9,054.55 1,587.53 2,030.83 5,975,521.42 654,647.95 70°20'23.987 N 148°44'42.02 W 10,985.41 92.12 75.13 9,053.76 1,594.53 2,059.95 5,975,529.01 654,676.92 70°20'24.056 N 148°44'41.17 W 11,016.71 91.54 72.42 9,052.76 1,603.27 2,089.99 5,975,538.36 654,706.77 70°20'24.142 N 148°44'40.29 W 11,045.99 90.92 71.84 9,052.13 1,612.25 2,117.85 5,975,547.91 654,734.44 70°20'24.230 N 148°44'39.48 W 11,075.33 88.50 69.45 9,052.28 1,621.98 2,145.53 5,975,558.19 654,761.91 70°20'24.326 N 148°44'38.67 W 11,105.36 88.71 67.52 9,053.01 1,632.99 2,173.46 5,975,569.77 654,789.61 70°20'24.434 N 148°44'37.85 W 11,135.20 89.60 65.38 9,053.45 1,644.91 2,200.81 5,975,582.24 654,816.71 70°20'24.551 N 148°44'37.05 W 12/9/2014 11:49:06AM Page 5 COMPASS 5000.1 Build 61 ■ 1 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-28-Slot 28 Project: Prudhoe Bay TVD Reference: ORKB @ 66.71usft Site: PB F Pad MD Reference: ORKB @ 66.71usft Well: F-28 North Reference: True Wellbore: F-28C Survey Calculation Method: Minimum Curvature Design: F-28C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 11,165.28 88.83 63.81 9,053.86 1,657.81 2,227.97 5,975,595.69 654,843.61 70'20'24.678 N 148°44'36.26 W 11,195.34 88.10 61.90 9,054.67 1,671.52 2,254.71 5,975,609.94 654,870.06 70°20'24.813 N 148°44'35.48 W 11,225.31 88.59 60.45 9,055.53 1,685.96 2,280.96 5,975,624.91 654,896.00 70°20'24.955 N 148°44'34.71 W 11,253.76 90.95 63.18 9,055.65 1,699.40 2,306.03 5,975,638.86 654,920.79 70°20'25.087 N 148°44'33.98 W 11,285.22 92.06 66.74 9,054.82 1,712.71 2,334.52 5,975,652.74 654,949.00 70°20'25.218 N 148°44'33.15 W 11,315.35 91.97 69.94 9,053.76 1,723.82 2,362.50 5,975,664.42 654,976.75 70°20'25.327 N 148°44'32.33 W 11,346.25 89.82 73.10 9,053.28 1,733.61 2,391.80 5,975,674.81 655,005.84 70°20'25.423 N 148°44'31.47 W 11,374.96 87.76 75.06 9,053.88 1,741.48 2,419.40 5,975,683.24 655,033.27 70°20'25.500 N 148°44'30.67 W 11,405.52 88.19 77.92 9,054.96 1,748.62 2,449.09 5,975,690.97 655,062.81 70°20'25.570 N 148°44'29.80 W 11,435.42 91.26 81.07 9,055.11 1,754.07 2,478.48 5,975,697.02 655,092.08 70°20'25.624 N 148°44'28.94 W 11,465.56 90.61 85.01 9,054.62 1,757.72 2,508.39 5,975,701.28 655,121.91 70°20'25.660 N 148°44'28.07 W 11,495.36 88.59 88.03 9,054.82 1,759.53 2,538.13 5,975,703.69 655,151.60 70°20'25.677 N 148°44'27.20 W 11,525.29 90.61 89.54 9,055.03 1,760.16 2,568.05 5,975,704.94 655,181.50 70°20'25.684 N 148°44'26.32 W 11,555.32 91.63 88.93 9,054.45 1,760.56 2,598.07 5,975,705.95 655,211.50 70°20'25.687 N 148°44'25.45 W 11,585.39 92.58 89.75 9,053.34 1,760.91 2,628.12 5,975,706.91 655,241.54 70°20'25.691 N 148°44'24.57 W 11,615.39 93.99 92.98 9,051.62 1,760.20 2,658.05 5,975,706.80 655,271.48 70°20'25.684 N 148°44'23.70 W 11,645.43 94.79 91.11 9,049.32 1,759.13 2,687.98 5,975,706.34 655,301.42 70°20'25.673 N 148°44'22.82 W 11,675.52 92.83 90.76 9,047.32 1,758.64 2,718.00 5,975,706.46 655,331.44 70°20'25.668 N 148°44'21.94 W 11,705.42 90.37 90.73 9,046.49 1,758.25 2,747.89 5,975,706.68 655,361.33 70°20'25.664 N 148°44'21.07 W 11,735.52 89.45 89.48 9,046.54 1,758.19 2,777.98 5,975,707.24 655,391.42 70°20'25.663 N 148°44'20.19 W 11,765.46 88.71 86.88 9,047.02 1,759.14 2,807.90 5,975,708.80 655,421.31 70°20'25.673 N 148°44'19.32 W 11,795.45 91.84 85.75 9,046.87 1,761.07 2,837.83 5,975,711.34 655,451.19 70°20'25.692 N 148°44'18.44 W 11,825.48 90.67 83.65 9,046.21 1,763.84 2,867.72 5,975,714.72 655,481.01 70°20'25.719 N 148°44'17.57 W 11,855.54 89.85 81.74 9,046.08 1,767.67 2,897.53 5,975,719.14 655,510.74 70°20'25.756 N 148°44'16.70 W 11,885.58 89.63 79.22 9,046.21 1,772.63 2,927.16 5,975,724.71 655,540.25 70°20'25.805 N 148°44'15.83 W 11,915.35 89.91 77.04 9,046.33 1,778.76 2,956.29 5,975,731.43 655,569.25 70°20'25.865 N 148°44'14.98 W 11,945.60 90.09 74.60 9,046.33 1,786.17 2,985.61 5,975,739.43 655,598.42 70°20'25.938 N 148°44'14.13 W 11,975.49 89.75 72.55 9,046.38 1,794.62 3,014.28 5,975,748.46 655,626.91 70°20'26.021 N 148°44'13.29 W 12,005.43 90.21 70.52 9,046.39 1,804.10 3,042.68 5,975,758.52 655,655.10 70°20'26.114 N 148°44'12.46 W 12,035.32 90.55 68.57 9,046.19 1,814.54 3,070.68 5,975,769.53 655,682.89 70°20'26.217 N 148°44'11.64 W 12,065.37 91.01 65.85 9,045.78 1,826.18 3,098.38 5,975,781.73 655,710.34 70°20'26.331 N 148°44'10.83 W 12,106.07 89.82 62.65 9,045.48 1,843.86 3,135.03 5,975,800.15 655,746.62 70°20'26.505 N 148°44'9.76 W 12,125.73 90.28 62.24 9,045.47 1,852.96 3,152.46 5,975,809.60 655,763.86 70°20'26.594 N 148°44'9.25 W 12,155.42 89.20 61.02 9,045.60 1,867.06 3,178.59 5,975,824.23 655,789.69 70°20'26.733 N 148°44'8.49 W 12,171.87 88.00 59.16 9,046.00 1,875.26 3,192.84 5,975,832.72 655,803.78 70°20'26.813 N 148°44'8.07 W 12,201.00 88.00 59.16 9,047.02 1,890.19 3,217.84 5,975,848.15 655,828.46 70°20'26.960 N 148°44'7.34 W Projection to TD 12/9/2014 11:49:06AM Page 6 COMPASS 5000.1 Build 61 1 41 72 15677 WELL LOG TRANSMITTAL RECEIVED PROACTIVE DiAgNOsric SERVICES, INC. DATA LOGGED APR 0 9 2015 K.BEN' R AOGCCi�l.K.BENDER To: AOGCC Makana Bender 333 W. 7th Ave Suite 100 Anchorage,Alaska 99501 [907) 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and/or Tubing Inspection(Caliper/ MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Analisa Steger LR2 - 1 900 Benson Blvd. Anchorage, AK 99508 aancpdc@bp.com SCANNED MAY 0 8 2015 and ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage,AK 99518 Fax: (907) 245-8952 1) LeakPointTM Survey 15-Mar-15 F-28C BL/ CD 50-029-21649-03 2) Signed : Date : Print Name: PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAx: (907)245-8952 E-MAIL: PDSANCHORAGE@MEMORYLOG.COM WEBSITE:WWW.MEMORYLOG.COM D\Archives\MasterTemplateFdes\Templates\Distnbution\Transmdtal$heets\BP_Transmd docx 2A-\-1 Z. j5 i 3 WELL LOG GED LOG TRANSMITTAL DATA LOG 15 K.BENDER PROACTIVE DIAGNOSTIC SERVICES,IIINC. RECEIVED APR 0 9 2015 AOGCC To: AOGCC Makana Bender 333 W. 7th Ave Suite 100 Anchorage,Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and/or Tubing Inspection(Caliper/ MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Analisa Steger LR2 - 1 900 Benson Blvd. Anchorage,AK 99508 gancpdc@bp.com SCANNED? j11: ,.... and t 'u8 m ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage,AK 99518 Fax: (907) 245-8952 1) LeakPointTM Survey 05-Jan-15 F-28C BL/ CD 50-029-21649-03 2) ***Replacement *** 5�, ZS 2rj2 Signed : e ;1) 6-C4itteet Date : Print Name: PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAx: (907)245-8952 E-MAIL: PDSANCHORAGEO.MEMORYLOG.COM WEBSITE:WWW.MEMORYLOG.COM D\Archives\MasterTemplateFiles\Templates\Dstnbutton\TransmtttalSheets\BP_Transmit docx Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Sunday, March 29, 2015 8:24 AM To: AK, OPS GC1 OSM;AK, OPS GC1 Field O&M TL; AK, OPS GC1 Wellpad Lead;AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan;AK, D&C Well Services Operations Team Lead;AK, D&C Wireline Operations Team Lead;AK, RES GPB West Wells Opt Engr; Derrick, Mackie;AK, RES GPB East Wells Opt Engr;AK, OPS Well Pad DFT N2;Wallace, Chris D (DOA); Regg,James B (DOA) Cc: AK, D&C DHD Well Integrity Engineer;AK, D&C Projects Well Integrity Engineer;AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R Subject: OPERABLE: Producer F-28C (PTD #2141720) Passing MIT-T Post Patch Attachments: image001jpg; F-28C Wellbore Schematic.pdf All, Producer F-28C (PTD#2141720) had a passing MIT-T performed on March 28, 2015 and a passing MIT-IA the day previous after a tubing patch was set from 7,741—7,777' MD.This passing test demonstrates competent barriers have been restored downhole.The well has been reclassified as Operable and may be brought online as needed. Please use care as annuli will be susceptible to thermal effects. An updated wellbore schematic has been included for reference. Thank you, Laurie Climer SCANNED (Alternate: Kevin Purk,$) BP Alaska-Well Integrity Coordinator GVVG:ol Wells 3�a Organization WIC Office: 907.659.5102 WIC Email: AKDCWeIlIntegrityCoordinator@BP.com 1 TREE= • 4-1/16"CNV SAI.. NOTES: WELL ANGLE 70"�9305'"' ELLIiEAD= Mc EVOY F-2 8 MAX DOGLEG:35.7° 9365'"'" ACTUATOR= BAKER C OKB.H-EV= 66.7' BF.ELEV= 38' / 2085' --14-1/7 OTIS SSSV NP,D=3.813" KOP= 6700' •CONDUCTOR, -1 r' Q GAS LFT MANDRELS Max Angle= 97"0 9425' _#. ' T' ' ' 'NDIVI) DEV TYPE VLV LATCHSIZE DATEDatum MD= 9041' Datum TVD= 8800'SS D r7 2978 2978 1 OTIS DMY RM 0 03/11/15 '6 4774 x4774 r 0 OTIS DMY RM r 0 03/11/15 13-3/8'CSG,68#,L-80 BTRS,D=12.415' ± 2675' r 6 EL5 r5904'5903 r 1 OTIS DMY RA r 0 10/12/86 '4 '6640'6638' 8 OTIS DMY RA ' 0 10/12/86 4-112'BKR 45 KB PATCH,V=2.45(01/05/15) —17741' -777$'( - r3 '7180'7161 ' 18 OTIS DMY RA ' 0 10/12/86 2 7758 7698 24 OTIS 'DAM RA 0 10/27/14 1 8140 8045 25 OTIS EQ DMY RA 0 10/12/86 Minimum ID = 1.78" a@ 8270' 'STA#2=SWELL I IX DAY BBSD PA Tc Il(Set 01/05/15) WIPER PLUG BUSHING IN DEPLOY SLVI I l 8209' -j4-1/2"OTIS XA SLDSLV,D= 3.813" 8246' H45 KB/PTSA LIP,ID=2.375"(01/04/15) 8268' -12-7/8"X NP,ID=2.313"(01/04/15) 8453' H3.70"BKR DEPLOY SLV,D=3.00" TOP OF 2-3/8"LNR — 8253' 8259' —13-1/2"X 2.891'XO,D=2.25" 8260' 3.70" BKR DEPLOY SLV,D=225" w/WIPER PLUG BUSHING @ 8270',ID=1.78" 8268' -1 TNV TBG SEAL ASSY Z a...� 8283' -19-5/8"X 4-1/2' TM/HHBP PKR D=4.750" TOP OF r LNR —1 8321' J-- 828WMILL OUT DCTB4SFON D=6.004" BEHIND 8321' —17"BROWN SHORTY HYD HGR CT LNR I r------i 8325' H 4-1/2"OTIS X NP,D=3.813" F 8349' —13.70'BKR DEPLOYMENT SLV,D=3.00" 8357' —14-1/2"OTIS XN NP,MLLE )ID=3.80"(05/11/04) 4-1/7 TBG, 12.6#,L-80 BUTT,.0152 bpf,D=3.958" —I 8391' I 8369' --I 3-1/2"HES X MP,D=2.813' 3-1/7 LNR 8.81#,L-80 STL,.0087 bpf,D=2.992" H 8401• / ��'"1 8391' --�4-112"WLEG,D=3.958" BEHIND 9-5/8'CSG,47#,L-80 NSCCIBTRS,D=8.681" —1 8593' J ----..........i 8401' I-13-v2"X 3-3/16"XO,D=2.786" CT LNR I 8845' _I ESTIMATE)TOP OF CEA NT 7'LNR 26#,L-80 TC45,.0383 bpf,D=6.276" H -9073 1� j j �G� a. 3-3/16"BKR PKR WHPSTOCK(12/01/14) -1 9120' ^9120' _I TOC(12/08/14) 3-3/16"LNR 6.2#,L-80 TCI, .0076 bpf,D=2.80" H -9120' FERFORATDN SUAMIARY 73-3/16'MLLOUT WINDOW(F-28C) 9120'-9125' REF LOG:BEI RPM/GR/CCL ON 12/09/14 0 ANGLE AT TOP PERF: 90'@ 10900' - 10863' _ RA MARKER PUP JOINT Note:Refer to Roduction DB for historical perf data ; SIZE SFF INTERVAL Opn/Sqz SHOT SOZ 1.56" 6 10900-11450 0 12/10/14 : I 1.56" 6 11600-11700 0 12/10/14 r I 1.56" 6 11850- 12140 0 12/10/14 : I i 12159' _j PBTD 2-3/8"LNR,4.6#,L-80 T1511,.0039 bpf,ID=1.995" —1 12201' i A DATE FEV BY CONAVENTS DATE REV BY COMMENTS FRUDHOE BAY UNIT 10/12/86 NI 8E ORIGINAL COMPLETION 01/05/15 DHS/PJC SET GL STRADDLE PATCH WELL: F-28C 05/22/04 NORDIC 1 CTD SIDETRACK(F-28A) 01/08/15 PJC LTP(01/04/05)CORRECTION PE RNIT No: 2141720 01/16/11 NOREIC 1 CTDSIDETRACK(F-28B) 01/13/15 GJF/JMD GLV C/O(01/10/15) API No: 50-029-21649-03 12/11/14 NORDIC 2 CTD SIDETRACK(F-28C) 03/11/15 JTM/PJC GLV C/O SEC 2,T11N,,R13E,2359'FSL&2193'FEL 12/17/14 KRJMO FNAL ODEAFPROVAL 01/07/15 SWC/JMD SET LTPw/X NP(01/04/15) BP Exploration(Alaska) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. Q1` - 4 7 a. Well History File Identifier Organizing (done) ❑ Two-sided ❑ Rescan Needed RESCAN: OVERSIZED: NOTES: u4pr Items: ❑ Maps: Grayscale Items: 4s: ❑ Poor Quality Originals: ❑ Other: ❑ Other: BY: Maria Date: 3 5 I5-- /s/ nil P Project Proofing BY: all, Date: 3/c4 I v /s/ u , Scanning Preparation x 30 = (00 + = TOTAL PAGES (U 0 /5 (Count does not include cover sheet) BY: et. Date:-3/ /s/ I 1 Production Scanning / Stage 1 Page Count from Scanned File: lQ I (Count does include cover sh et) Page Count Matches Number in Scann'ng Preparation: ES NOC BY: de. Date: 3 51 /5 isi ri r Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Stage 2 Additional Well Reports: YES NO TOTAL PAGES: Digital version appended by: Meredith Michal Date: /s/ Final Page Count: Stage 1 + Stage 2: TOTAL PAGES: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: /s/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc o - p • I f I J I W ' N o LL 0 -lo Y • m o V 0 cb W LT_ JI W JI 0 H a 01 • Cil Z cv JI Z JI Z n °a > SI UI 7 W E csiN • Z LLZI Q' co X I O' p 9 D }I @ LL u)I LL In N N >' >' '� lc mI QI T o in 0 LL @ 01 p o1 0 Z Z a YI Z -v C N a) F > to to u) to �, n co CD 0 LLI i 1 I �o a Z z m UI vI m m 2 I (o =1 Qo co t N N N N W W LL LL V) NI �I ml vl o 0 0 2 LL �I 0W N W LU c00a0 W CO W a0 CO CO W N N 0 0 0 0 N N N N N N N N N, J C H )CC LL p LL p E1 LL p LL p a w LL LL LL LL LL LL LL LL LJJ V 0 o c m QI ai NI E ai co 0 ai NI,._ ai w ai ai ai ai ai ai ai ai ai N. - 0 £ it LL F it a it H it it it it it LL it LL LL p o 0 .1 0I U v 1. U g 0 rn 0 0 0 0 0 0 1 0 E 'c Q "c CC H c I "CRH 'E CC—' C C C C C C C C C a) u) m 0) o 20 20o 20 -200 202 0 0 0 0 0 0 0 0 o1r J u) J 0 .-. �I N WI=1 N WImI N�I=1 N WI01 N N N 0 N 0 0 N 0 0I ce Q 2 W N W N00 WN0 WNm W N J LU LU W LU LU LU W LU LU 0 Z j w V V 7 7 V V V V V sr V' V sr V A errz O 0 N ) �p �O 0 0 p 0 0 0 0 0 0 0 0 0 li > N N N N N N N N N N N N N N W : °d M M M M M M M CO CO CO CO CO M CO ° V N N N N N N N N N N N N N N AI J Lo reCNI CV N N N N N N N N N N N N �i a Ww — Et- - W J 2 2 U m o 00 Z 8 Q w a p w co w m m o. Cl. 0 V) O c ZI = rp C T 2 co c O N N oo 0 N a N o E a M N U E C o N o 1 7 O — 0 d' Z CZ < W au NO G LLsr 2co o'O ~ Z N J r2 r J N M Q 0 O�0 Y.1 m 0 co (/) 0 a> 0 0 CO o 0 u) Qo O. re Q a 2I cr z E z Q o d U 0 0 E J ?) CO 13 M Z 7 LO co Cl, co co CO CO CO CO CO CO CO CO CO a) y co co Cl, co fa co co CO CO CO CO CO CO CO v E E a 0 0 0 0 0 0 0 0 0 0 0 0 0 rn Z m m m m m CO CO CO CO CO 0 m CO CO y O) _m m _m O) co co co co co O) co co O) o 0 Z 0 1.. 0 0 0 0 0 000000000 N > O J N 2 co M_ CO M M CO M M CO M M M M M H r f' d V w E N in N N N NLO N N N N N N N N N Lf) LO LO If3 0 LO LO LO LO N 2 Q 0 0 W CO z N N N N N N N N N N N N N N I- a. 0 0 < O E E a �a Z 2 w u. O N 0 y 5 d 0 w CC Z W c 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 E 5 Q 0 J o d 0 CY ~ a = sad +° a D 0 0 0 0 0 0 0 0 0 0 0 0 0 Q a 2 alCC 0 IT$ -I0I- w w w w w w W W w w LU LU w LU o ,� o • U o 0' o qJ �g �g o Z JI 0 co T co j NI co Z • 0 >- >- >- N 0 < 0 LLI Z LLI� LLIm • ` a 0 N 0 LT_ m m m e m e N To �' U F a c LL0_ LL O IL 0 IL 0 3 F ca Q c o v. co CL @ @mmII„ IJZ > D LL a) UQU - UL r Oai CO yya '- >- cmcJI c_I c.) o_ N cli Q 7 aU ii -I LLN EI LLI LLI m O o N Vt 710 =m =mw j U J NW 0J = N m N D mNN.p d d d LLW Co.LL Cocc c c Z T O d Q I U)I 92 Y YCC c Q �' `c 0- o 0 m `-'"' `c `° `-' ami ami ami o a) E ` J ems' c N W c m c c 0 J c J c J N W ,_ ;o o�I= 0 o I ,-N ,-N )- I )- I .- I n o E >- >- 1 r q In OLL' Q o cj U U U U o2 o oto 7Q 0 co J _woo w EON O N w N 0p 05 wp W 0 N Q W lop NM WON W D MO MN MN EN NM N O co r LL z 3 a i[) u) uo °� �v m aw a _ U N O O O O O O EE O) as W N N N N N N CO 7 0 I N 0 iI,N M M M M M M CO Z N 0) II 1 IX J co a it E W w m °' Cu) a CO 0 _ m O n co 1 Z Q O CO CO ( O O 10) To m m N O N N O J n c a)6. 7 co co -O E - J °. co m O /� 0 .. 2 0 0 Om in c O O a) cT 0 0 orn o N C N y co co o n E V N U 0 (� c w � o N , ) N N OA Q CO N O. Co I— 1- a o E z 0 N ° Q T dco as c 0 m CO CO m c 0 1- E 0 a) Co c m• to = o) m Om N d c co Q= c I'' Ce o a a> c `E ° Q d - co o m O Z o 22 a) m E m o 2 0 la U U z m 0 m `m m m m m m m a� -a—a- a) aVd co 3 r•••• 0 m 0 0 0 0 0 0 m . NN O Co 2 m CO CO Co CO Co m O m O) .� m .� .� .5) .5) .50 .ED O) 'R } O r N D J 0 0 0 0 0 0 o p c N > M CO N N N N N N N o 0 w W O ti I- 10 10 u) 10 10 co co c w as E a O :4-t N 10 N o 11) Co U) In In lc) Ln I N N N N N N N N N N d1 LLl O y C m E O a) N y W m .. Ili O co z 2 F m 0 0 o d Q o Q c 0 U � co �,, U U U U U U U U U p 2 5 .0 J N N CU7 0 _ a m o a a m 0 m 0 0 0 0 0 0 0 0 o m U E 2 a) 0 o m O. 2 w � w W w w w w � 3 ? 0 a c9 0 0 CC kn o O 0 e1 N 9 cc 0) N z N N 0 Ci o T io C Z 10 J I ✓ P 1I z 7 y Cl) m io I- 0) 1 IX c N p z65 A • U L 5 LU LL 0 a W w U m o Z i Q ti w J o CL _0 aN n o E « M V N U N m ° E M J E aCO occt LL C1 enP. I— H z o I d } M CO r '� O N :: A z O co iv 0 Q o. ° a a) Q ° n z E o p C:.- 5.----) E U o Z d • N- 0 rn o > CO i- v 3 Nm re G N O N V o � « C C (� - O. 41 t0 U ig w E E o ao M o 0 0 7LHun - z� 17Z-- Hunt, t, Jennifer L (DOA) From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Tuesday, February 24, 2015 2:37 PM To: Hunt, Jennifer L(DOA) Subject: PBU F-28C/ PTD#214-172 Hi Jennifer, Please reference the following well: Well Name: PBU F-28C Permit#: 214-172 API #: 50-029-21649-03-00 Date of Test: 2/17/15 Type of Test: IPT (Initial Production Test) Choke Size: 176 Choke Unit: 64ths Production Method: Gas Lift Duration (Hours Tested): 8 Top Reference (Top Perf MD): 10900' Bottom Reference (Bottom Perf MD): 12140' Tubing Flowing (Pressure): 640 Casing Pressure: 1700 Total Test(Rate f/0, W, G): 703/2 /245 24-Hour Rate (0, W, G): 2108 /5/735 Gravity (Oil, API): 20.6 Deg GOR (Gas-Oil Ratio): 349 This well began Production on: 2/16/2015 Method of Operations on this date: Gas Lift 1 Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Wednesday, February 18, 2015 8:49 PM To: AK, OPS GC1 OSM; AK, OPS GC1 Field O&M TL; AK, OPS GC1 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Team Lead; AK, D&C Wireline Operations Team Lead; AK, RES GPB West Wells Opt Engr; Duong, Lea; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad DFT N2; Wallace, Chris D (DOA); Regg, James B (DOA) Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Pettus, Whitney Subject: NOT OPERABLE: Producer F-28C (PTD #2141720) Well Testing Completed Attachments: image001.png; image002.jpg All, Producer F-28C (PTD#2141720) has been shut-in and isolated post an economic evaluation well test. At this time, the well has been reclassified as Not Operable until well integrity can be restored. Please call with any questions. Thank you, Laurie Climer (ilicrnatc:Jack Diehrou) BP Alaska-Well Integrity Coordinator fNA Global Wens VYY Organization WIC Office: 907.659.5102 WIC Email: AKDCWellIntegrityCoordinator@BP.com From: AK, D&C Well Integrity Coordinator Sent: Sunday, February 15, 2015 7:11 AM To: AK, OPS GC1 OSM; AK, OPS GC1 Field O&M TL; AK, OPS GC1 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Well Services Operations Team Lead; AK, D&C Wireline Operations Team Lead; AK, RES GPB West Wells Opt Engr; Duong, Lea; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad DFT N2; 'chris.wal lace@alaska.gov' Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Well Integrity Coordinator; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; 'Regg, James B (DOA) (jim.regg@alaska.gov)' Subject: UNDER EVALUATION: Producer F-28 C (PTD #2141720) Permission to Flow Well All, Producer F-28C (PTD#2141720) is a natural flow producer with known tubing x inner annulus communication through a hole in the tubing. BP has received permission from the AOGCC to flow the well for a period of up to 28 days to evaluate . The well is reclassified as Under Evaluation and placed on a 28 day clock. BP will not actively manage the inner annulus pressure once the well is online and thermally stable. The inner annulus will not be allowed to exceed 2000 psi, 1 and the outer annulus will not be allowed to exceed 1000 psi. If either of these pressures are reached during the well tests after the well is thermally stable the well will be shut in and well tests will be terminated. Once the evaluation is complete,the well must be shut in. Please use caution while placing the well on production due to fluid packed annuli. Kevin Parks (AMC,,r01( ;(inH < u!rc! , BP Alaska-Well Integrity Coordinator GVV Global Wells Organization Office: 907.659.5102 WIC Email:AKDCWelIIntegrityCoordinator@bp.com 2 111/ Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Sunday, February 15, 2015 7:11 AM To: AK, OPS GC1 OSM; AK, OPS GC1 Field O&M TL; AK, OPS GC1 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan;AK, D&C Well Services Operations Team Lead; AK, D&C Wireline Operations Team Lead; AK, RES GPB West Wells Opt Engr; Duong, Lea; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad DFT N2; Wallace, Chris D (DOA) Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Well Integrity Coordinator; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Regg, James B (DOA) Subject: UNDER EVALUATION: Producer F-28 C (PTD #2141720) Permission to Flow Well Attachments: image001.png All, Producer F-28C (PTD#2141720) is a natural flow producer with known tubing x inner annulus communication through a hole in the tubing. BP has received permission from the AOGCC to flow the well for a period of up to 28 days to evaluate . The well is reclassified as Under Evaluation and placed on a 28 day clock. BP will not actively manage the inner annulus pressure once the well is online and thermally stable. The inner annulus will not be allowed to exceed 2000 psi, and the outer annulus will not be allowed to exceed 1000 psi. If either of these pressures are reached during the well tests after the well is thermally stable the well will be shut in and well tests will be terminated. Once the evaluation is complete,the well must be shut in. Please use caution while placing the well on production due to fluid packed annuli. Kevin Parks (Alternate Laurie Climer) BP Alaska-Giv Well Integrity Coordinator Global Wells Organization Office: 907.659.5102 WIC Email:AKDCWeIlIntegrityCoordinator@bp.com 1 2--52-52 WELL LOG TRANSMITTAL II DATA LOGGED ' \ i V-1/2015 PROACTIVE DIAGNOSTIC SERVICES, INC. K BENDER RECEIVED To: AOGCC Makana Bender JAN 13 20b 333 W. 7th Ave Suite 100 AOGC Anchorage,Alaska 99501 (907) 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and/or Tubing Inspection(Caliper/ MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Merion Kendall LR2 - 1 900 Benson Blvd. Anchorage,AK 99508 and ProActive Diagnostic Services, Inc. Attn: Robert A. Richey 130 West International Airport Road Suite C Anchorage,AK 99518 Fax: (907) 245-8952 1) LeakPointTM Survey 05-Jan-15 F-28C BL/ CD 50-029-21649-03 2) Signed : /' 24'201l,5 - 6 Date : Print Name: PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-8952 E-MAIL: PDSANCHORAGEcMEMORYLOG.COM WEBSITE:WWW.MEMORYLOG.COM D\Archrves\MasterTemplateFiles\Templates\Distribution\TransmrttalSheets\BP_Transmit docx RECEIVED ` STATE OF ALASKA JAN 0 8 2015 • ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOd.OGCC la. Well Status: ®Oil ❑Gas 0 SPLUG 0 Other ❑Abandoned 0 Suspended 1b. Well Class 20AAC 25 105 20AAC 25 110 0 Exploratory 0 Stratigraphic 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions One • ® Development 0 Service 2. Operator Name: 5. Date(Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. 12/11/2014• - 214-172 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 12/2/2014. 50-029-21649-03-00 4a. Location of Well(Governmental Section): 7. Date T.D. Reach*d: S 14. Well Name and Number: Surface: 12/,T/2014. t•11't PBU F-28C ' 2359' FSL, 2193' FEL, Sec. 02,T11N, R13E, UM - 8. KB(ft above MSL): 66.71' 15. Field/Pool(s) Top of Productive Horizon: 2952' FSL, 1366' FEL, Sec. 02, T11N, R13E, UM GL(ft above MSL): 36.46' Prudhoe Bay/Prudhoe Bay • Total Depth: 9. Plug Back Depth(MD+TVD) 4249' FSL, 1026' FWL, Sec. 01,T11N, R13E, UM 12159' - 9046' 4b. Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 652650 . y- 5973893 • Zone- ASP4 • 12201' • 9047' - ADL 028280 TPI: x- 653464 y- 5974503 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth: x- 655828 y- 5975849 Zone- ASP4 None 18. Directional Survey: ® Yes ❑ No 19.Water depth, if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD/GR/RES, GR/CCL/RPM • 9120' 8938' - 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# H-40 32' 112' 32' _ 112' 8 cu yds Concrete 13-3/8" 68# L-80 31' 2675' 31' • 2675' 17-1/2" 3274 cu ft AS III,465 cu ft AS II 9-5/8" 47# L-80 28' 8593' 28' 8457' 12-1/4" 575 cu ft Class'G' 7" 26# L-80 8321' _ 9073' 8209' 8896' 8-1/2" ,374 cu ft Class'G' _ 3-1/2"x 3-3/16" 8.81#/6.2# L-80 8349' 9120' 8235' 8938' 4-1/4" 146 cu ft Class'G' 2-3/8" 4.6# L-80 8245' 12201' 8141' 9047' 3-1/4" 79 sx Class'G' 24. Open to production or injection? ®Yes 0 No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ (MD+TVD of Top&Bottom; Perforation Size and Number): TVD) 1.56"Gun Diameter, 6 spf 4-1/2", 12.6#, L-80 8391' 8283'/8175' 26. ACID, FRACTURE,CEMENT SQUEEZE, ETC. 10900'-11450' 9055'-9055' <I I ' \ '' , 11600'-11700' 9053'-9047' ..,.-,i1 i f i...) WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ® No 11850'- 12140' 9046'-9045' 1 i DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED J ‘ -2500' Freeze Protect w/45 Bbls Diesel 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ® No Sidewall Core(s)Acquired? 0 Yes ® No, If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions,core chips, photographs and laboratory analytical results per 20 AAC 250.071. None Form 10-407 Revised 10/2012CONTINUED O REVERS Submit Original Only 10/2012p.77... z/� / 5 � �% RBE MS JAN 1 2015 .. 2 ff./c(�7� 29. GEO,.OGIC MARKERS(List all formations and• 'kers encounter 30. FORMATION TESTS NAME TVD Well Tested? (es 0 No • Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Zone 1 9240' 9028' None Formation at Total Depth: Zone 1 9240' 9028' 31.List of Attachment. Summary of Daily Drilling Reports, Summary of Post-Rig Work,Well Schematic Diagram,Surveys,Cement Report 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: J.Kyle Raese,564-4629 Email: John.Raese@bp.com Printed Name: Joe Lastufka Title: Drilling Technologist Signature. Phone 5644091 Date: 1/W i INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed Item 1 a• Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13. The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation. Flowing,Gas Lift,Rod Pump, Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain) Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only TREE=4 4-1/16"CNV F(WELLHEAD= MCEVOY E'2 8 C SAF )TES: WELL ANGLE>70°@ 9305'**` MAX. .EG:35.7°(8 9365'*** *ACTUATOR= BAKER C E = 66.7' BF.BE == 3 3 ; I f BF. 8' /) , I 2085' —14-1/2"OTIS SSSV NIP,ID=3.813" KOP= 6700' "CONDUCTOR I O GAS LIFT MANDRELS Max Angle= 97°@ 9425' — Datum bD= 9041' —#' ST MD Vi' DEV TYPE VLV LATCH SIZE DATE Datum TVD= —8800'SS ID — , r7 '2978'2978 r 11 OTS DMY RM r 0 11/15/13 r6 ►4774 4774 r 0 OTIS DMY RM r 0 11/15/13 13-3/8"CSG,68#,L-80 BTRS,ID=12.415" —I 2675' r5 ►5904►5903 r 1 OTIS DMY RA r 0 10/12/86 r4 '6640'6638 r 8 OTIS DMY RA r 0 10/12/86 4-1/2"BKR 45 KB PATCH,ID=2.45(01/05/15) 1 7741' -7778'I—P1 r3 ►7180 x7161 r 18 OTIS DMY RA r 0 10/12/86 2 7758 7698 24 OTIS *DMY RA 0 10/27/14 1 8140 8045 25 OTIS EQ DMY RA 0 10/12/86 Minimum ID = 1.78" @ 8270' *STA#2=SWELL FIX DMY BEHIND PATCH(Set 01/05/15) WIPER PLUG BUSHING IN DEPLOY8270I I t 8209' —+4-1/2"OTIS XA SLD SLV,ID= 3.813" 1 8245' —145 KB/PTSA LW,ID=2.375"(01/04/15) 8258'_1-12-7/8"X NIP, ID=2.313"(01/04/15) 8253' —13.70"BKR DEPLOY SLV,ID=3.00" TOP OF 2-3/8"LNR — 8253' 8259' H3-1/2"X 2.891"XO,ID=2.25" • 8260' 13.70" BKR DEPLOY SLV,ID=2.25" w/WIPER PLUG BUSHING @ 8270',ID=1.78" 8268' —{TN/TBG SEAL ASSY \ 8283' H9-5/8"x4-1/2" TNV HHBP PKR ID=4.750" � 8288' MILL OUT EXTENSION,ID=6.004" TOP OF 7"LNR H 8321' BEHIND 1 8321' H7"BROWN SHORTY HYD HGR CT LNR I r----- 8325' —14-1/2"OTIS X NP,ID=3.813" F 8349' —3.70"BKR DEPLOYMENT SLV,ID=3.00" I 8357' H4-1/2"OTIS XN NP,MILLED ID=3.80"(05/11/04) I=-1/2"TBG,12.6#,L-80 BUTT,.0152 bpf,ID=3.958" H 8391' I 8369' —1 3-1/2"HES X NIP,ID=2.813" 3-1/2"LNR,8.81#,L-80 STL,.0087 bpf,ID=2.992" H 8401' ` 8391' �4 1/2"WLEG,ID=3.958" CT ND LI NR 8401' 13-1/2"X 3-3/16"XO,ID=2.786" 9-5/8"CSG,47#,L-80 NSCC/BTRS,ID=8.681" H 8593' r , 1 8845' _1ESTIMATED TOP OF CEMENT —I 7"LNR,26#,L-80 TC45,.0383 bpf,ID=6.276" —9073 3-3/16"BKR PKR WHIPSTOCK(12/01/14) —I 9120' —9120' TOC(12/08/14) 3-3/16"LNR,6.2#,L-80 TCII,.0076 bpf,ID=2.80" H —9120' PERFORATION SUMMARY 3-3/16"MILLOUT WINDOW(F-28C) 9120'-9125' REF LOG:BHI RPMGR/CCL ON 12/09/14 ANGLE AT TOP PERF: 90°@ 10900' 10863' RA MARKER PUP JOINT Note:Refer to Roduction DB for historical perf data SIZE SFF INTERVAL Opn/Sqz SHOT SQZ 1.56" 6 10900-11450 0 12/10/14 7 1.56" 6 11600-11700 0 12/10/14 ' 12159' _I PBTD 1.56" 6 11850-12140 0 12/10/14 7 2-3/8"LNR,4.6#,L-80 TH511,.0039 bpf,ID=1.995" H 12201' DATE REV BY COMvENIS DATE REV BY COMIVENTS PRUDHOE BAY UNIT 10/12/86 N18E ORIGINAL COMPLETION 01/05/15 DHS/PJC SET GL STRADDLE PATCH WELL: F-28C 05/22/04 NORDIC 1 CTD SIDETRACK(F-28A) 01/08/15 PJC LTP(01/04/05)CORRECTION PERMT No: 2141720 01/16/11 NORDIC 1 CTD SIDETRACK(F-28B) AFI No: 50-029-21649-03 12/11/14 NORDIC 2 CTD SIDETRACK(F-28C) SEC 2,T11 N,R13E,2359'FSL&2193'FEL 12/17/14 KR/JMD FINAL ODE APPROVAL 01/07/15 SWC/JMD SET LTPw/X NIP(01/04/15) BP Exploration(Alaska) North America-ALASKA-BP Page 1 of 10 Operation Summary Report Common Well Name:F-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/29/2014 End Date:12/7/2014 X3-015YJ-C:(4,415,342.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292164900 Active datum:ORKB @66.71 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11/29/2014 06:00 - 08:00 2.00 MOB P PRE PJSM AND BACK OFF WELL -BACK OFF WELL WITH WSL,NORDIC SUPERINTENDANT&NORDIC TOOL PUSHER -STAGE RIG ON PAD -PU RIG MATS/CLEAN AROUND WELL -MOVE RIG TO PAD ENTRANCE 08:00 - 13:45 5.75 MOB P PRE RIG MOVE FROM DS 15 TO F PAD -MOVE DOWN ACCESS ROAD TO OXBOW -RIGHT ON OXBOW TO SPINE ROAD -SPINE ROAD TO F PAD ACCESS ROAD -REPAIR KINGPIN ON SATELLITE OFFICE (PRICE PAD) 13:45 - 14:00 0.25 MOB P PRE NOTIFICATION GIVEN TO AOGCC FOR BOPE TEST -TIME REQUEST SUBMITTED:13:45 HRS 11/29/2014 -REQUESTED TIME OF INSPECTION:14:00 HRS 11/30/2014 -REQUEST SUBMITTED BY JESSIE WALKER 14:00 - 16:00 2.00 MOB P PRE RIG MOVE FROM DS 15 TO F PAD -SPINE ROAD TO F PAD ACCESS ROAD -F PAD ACCESS ROAD TO F PAD -SPOT RIG ON BACKSIDE OF PAD 16:00 - 17:00 1.00 MOB P PRE SET RIG MATS AROUND WELL -CONTINUE REPAIR WORK TO SATELITTE OFFICE 17:00 - 19:00 2.00 BOPSUR N RREP PRE PJSM AND REMOVE KILL LINE HARD LINE FIT AND REPLACE KILL LINE HARD LINE WITH NEW CONTINUE REPAIR SATELLITE OFFICE 19:00 - 21:00 2.00 MOB P PRE MOVE SATELLITE OFFICE FROM PRICE PAD TO F-PAD STAGE AND POSITION SATELLITE OFFICE ON PAD 21:00 - 22:00 1.00 MOB P PRE PJSM AND PULL OVER WELL -JACK UP RIG AND SQUARE UP TO WELL -PULL OVER WELLAND SET DOWN -ACCEPT RIG AT 22:00 ON 11/29/2014 22:00 - 00:00 2.00 BOPSUR P PRE PJSM AND NIPPLE DOWN TREE CAP -CYCLE TREE VALVES FOR THERMAL EXPANSION -LEAK TIGHT TEST TREE VALVES -NIPPLE DOWN TREE CAP 11/30/2014 00:00 - 00:30 0.50 BOPSUR P PRE PERFORM H2S RIG EVAC DRILL WITH AAR 00:30 - 06:00 5.50 BOPSUR P PRE PJSM AND NIPPLE UP BOPS -NIPPLE UP BOP STACK AND CENTER IN ROTARY -MU LUBRICATOR RISER FROM STACK TO FLOOR -TAKE STACK MEASUREMENTS FROM FLOOR -GREASE BOPE VALVES AS NEEDED SIMOPS: -STAGE CUTTINGS BOX,TIGER TANK,AND WELDING SHOP -RIG UP TIGER TANK HARD LINE Printed 12/15/2014 3:15:29PM North America-ALASKA-BP Page 2 of 10 • Operation Summary Report Common Well Name:F-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/29/2014 End Date:12/7/2014 X3-015YJ-C:(4,415,342.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/19/1986 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292164900 Active datum:ORKB @66.71 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 07:00 1.00 BOPSUR P PRE PJSM AND SHELL TEST BOPE FILL STACK WITH WATER -PRESS TEST TO 250/3500 PSI FOR 5/5 CHARTED MIN 07:00 - 16:30 9.50 BOPSUR P PRE PJSM AND TEST BOPE STATE GIVEN NOTIFICATION OF BOPE TEST 11/29/2014 13:45 STATE INSPECTOR JOHNNIE HILL WAIVE WITNESS 11/30/2014 05:36 PRESSURE TEST ALL BOP EQUIPMENT AS PER AOGCC REGS,SUNDRY#210-162,AND CRT-AK-10-45 -TEST BOPE TO 250/3500 PSI FOR 5/5 CHARTED MIN I-TEST CHOKE VALVES,CHOKE AND KILL HCR VALVES,INSIDE MANUAL VALVES ON CHOKE 1 AND KILL LINES,BOP RAMS AND ANNULAR PREVENTER -LOWER 2"PIPE RAMS TESTED WITH 2" TEST JOINT -2-3/8"PIPE RAMS TESTED WITH 2-3/8"TEST JOINT UPPPER 2"PIPE RAMS TESTED WITH 2" TEST JOINT -BLIND RAMS TESTED ON OPEN HOLE -ANNULAR TESTED WITH BOTH 2"AND 2-3/8" TEST JOINT 1-TEST FULL OPENING SAFETY VALVE 1-FUNCTION BOPE FROM BOTH REMOTE PANELS TEST GAS ALARMS 1-PERFORM DRAW DOWN TEST OF ACCUMULATOR -ALL TESTS WITNESSED BY TOOLPUSHER IAND WSL -NO FAILURES 16:30 - 17:00 0.50 BOPSUR P PRE PJSM AND PRESS TEST INNER REEL VALVE, PACKOFFS,AND INJECTOR LUBRICATOR -GET ON WELL,CIRC DIESEL OUT COIL TO TIGER TANK LINE UP TO REVERSE CIRCULATE -PRESS TEST TO 250/3500 PSI FOR 5/5 MIN 17:00 - 19:00 2.00 BOPSUR P PRE PERFORM SLACK MANAGEMENT -CIRCULATE TO WARM UP COIL/E-LINE -STAB ON WELL,PUMP E-LINE BACK INTO REEL .-CUT 290'COIL 19:00 - 20:00 1.00 BOPSUR P PRE PJSM AND INSTALL CTC -TESTED NIGHT CAP ON WELL.SHUT IN SWAB AS PER L2RA FOR HOTWORK ON THE 1 RIG FLOOR. -DRESS COIL END,INSTALL SLB CTC I-PULL TEST TO 35K# -PRESS TEST TO 250/3500 PSI Printed 12/15/2014 3:15:29PM • North America-ALASKA-BP Page 3 of 10 Operation Summary Report Common Well Name:F-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/29/2014 End Date:12/7/2014 I X3-015YJ-C:(4,415,342.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/19/1986 12:0O:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292164900 Active datum:ORKB @66.71 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:00 - 22:00 2.00 BOPSUR P PRE PJSM AND HEAD UP BHI -PU INJECTOR.MU STINGER AND NOZZLE. PUMP SLACK FORWARD OVER BUNGHOLE. -TEST E-LINE CONNECTIVITY,GOOD. -INSTALL BHI UQC WITH FLOATS. -RE-TEST E-LINE CONNECTIVITY,GOOD. -PRESS TEST UQC TO 250/3500 PSI,GOOD. -TEST UQC FLOATS TO 250/3500 PSI,GOOD. 22:00 22:30 0.50 BOPSUR P PRE PJSM AND TORQUE TREE BOLTS 22:30 - 00:00 1.50 BOPSUR P PRE PJSM AND RU LUBRICATOR -PU LUBRICATOR AND MU ROD EXTENSIONS -GET ON WELL,FILL LUBRICATOR WITH KCL -PREE TEST TO 250/3500 PSI 12/1/2014 00:00 - 02:00 2.00 BOPSUR P PRE PJSM AND PULL TWC -BLOW DOWN STACK,FILL WITH MEOH -PULL TWC,WELL ON VAC -SHUT IN TREE VALVES,RD LUBRICATOR 02:00 - 03:00 1.00 BOPSUR ' P PRE PJSM AND RU TO BULLHEAD KILL WELL -PU INJECTOR AND MU NOZZLE ASSEMLBY -GET ON WELL,FILL STACK WITH KCL PRESS TEST INJECTOR LUBRICATOR [250/3500 PSI -BLOW DOWN STACK 03:00 - 04:00 1.00 BOPSUR P PRE PJSM AND BULLHEAD KILL WELL -OPEN WELL TO CLOSED CHOKE,WHP=0 PSI -BULLHEAD 5 BBLS MEOH FOLLOWED BY KCL -PUMP 250 BBLS KCL 5.0 BPM,MAX WHP=1000 PSI,MAX IA PRESS=27 PSI 04:00 - 04:30 0.50 BOPSUR P PRE EXTENDED FLOW CHECK,WELL ON VAC 04:30 - 05:30 1.00 WHIP P WEXIT ,COME ONLINE WITH PUMP DOWN COIL TO ESTABLISH LOSS RATE -CATCH FLUID AT 17 BBLS -STATIC LOSS RATE-60-70 BBUHR 05:30 - 07:30 2.00 WHIP P I WEXIT PJSM AND PU DUMMY WS ASSEMBLY 1-POP OFF WELL,STAND BACK INJECTOR -FILL HOLE DOWN KILL LINE -PU DUMMY WS PU 2-3/8 COILTRACK -GET ON WELL,PRESS TEST QTS 07:30 - 10:00 2.50 WHIP P WEXIT RIH WITH DUMMY DRIFT F/60'-8600'MD -BPM IN/OUT:1.58/1.20 CIRC PSI:1311 -MW IN/OUT:8.38 PPG/8.36 PPG -LOSS WHILE RIH 23 BPH -BLED OA:F/780 PSI-0 PSI(10 GALS) 10:00 - 12:15 2.25 WHIP P WEXIT LOG/DRIFT F/8600'-9200'MD -LOG TIE-IN WITH(-12')DEPTH CORRECTION -DRIFT WELLBORE TO 9200'MD(WOB WHILE DRIFTING 0.25K) -PU F/9200'-8900'MD -DRY DRIFT DOWN F/8900'-9200'MD(NO ISSUES) -LOG CCL F/9200'-8100'MD 12:15 - 13:45 1.50 WHIP P WEXIT POOH F/8900'-66'MD -FLOW CHECK(NO FLOW) Printed 12/15/2014 3:15:29PM North America-ALASKA-BP Page 4 of 10 Operation Summary Report Common Well Name:F-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/29/2014 End Date:12/7/2014 X3-015YJ-C:(4,415,342.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292164900 Active datum:ORKB @66.71usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:45 - 14:30 0.75 WHIP P WEXIT CHANGE OUT BHA -LD DUMMY DRIFT BHA -MU WHIPSTOCK BHA -SET INJECTOR ON WELL -PRESSURE TEST QTS 250/3500(PASSED) 14:30 - 17:15 2.75 WHIP P WEXIT RIH WITH WHIPSTOCK BHA F/67'-9120'MD -BPM IN/OUT:0.39/0.36 CIRC PSI:161 -MW IN/OUT:8.35 PPG/8.34 PPG -LOG TIE-IN WITH(-11')DEPTH CORRECTION RIH TO 9120'MD 17:15 - 17:30 0.25 WHIP P WEXIT SET WHIPSTOCK @ 9120'MD -PRESSURE UP ON WHIPSTOCK TO 3100 PSI -SET 3.5K DOWN ON WHIPSTOCK(NO MOVEMENT) -UNSTING FROM WHIPSTOCK 17:30 - 19:30 2.00 WHIP P WEXIT SWAP WELL FOR 8.36 PPG KCL TO 9.53 PPG MUD -BPM IN/OUT:1.52/1.51 -WITH 9.5 PPG MUD ALL AROUND,LOSE RETURNS -INITIAL LOSSES-40-50 BPH -CALL AND MAKE NOTIFICATIONS TO ODE AND SUPERINTENDENT -LOSSES HEAL UP TO 1.10/1.10 BPM IN/OUT OVER 30 MIN -TOTAL LOSSES 15 BBLS 19:30 - 20:30 1.00 WHIP P WEXIT CIRCULATE OUT CRUDE CUT MUD -POOH WITH WS SETTING TOOL TO 8100' MD. -SEE MUD RETURNS CUT WITH CRUDE. -MUD WT IN/OUT:9.54/9.25 PPG. -STOP AND FLOW CHECK WELL,NO FLOW. -CALL AND MAKE NOTIFICATIONS TO ODE AND SUPERINTENDENT. -AGREE TO CIRCULATE UNTIL RETURNS CLEAN UP. -CIRC 0.85 BPM IN/OUT.TAKE CRUDE CUT RETURNS OUTSIDE. TEST FOR IA/TUBING COMMUNICATION -BLEED IA FROM 570 PSI WHILE CIRC AT 0.85 BPM IN/OUT. -IMMEDIATE LOSS OF RETURNS TO 0.85/ 0.48 BPM IN/OUT. -SHUT IN IA AND REGAIN FULL RETURNS.IA BUILD TO 530 PSI. -BLEED FLUID GAS,NO FREEZE PROTECT. 20:30 - 22:00 1.50 WHIP P WEXIT POOH WITH WS SETTING TOOL -100'/MIN WITH 1.21/0.81 BPM IN/OUT -FLOW CHECK AT SURFACE,NO FLOW 22:00 - 22:30 0.50 WHIP P WEXIT PJSM AND LD WS SETTING TOOL ASSEMBLY -POP OFF,STAND BACK INJECTOR -BLOW DOWN TOOL,LD 2-3/8"COILTRAK -LD WS SETTING TOOL SHEAR NUT FUNCTIONED AS INTENDED -OFFLOAD WS SETTING TOOL Printed 12/15/2014 3:15:29PM North America-ALASKA-BP Page 5 of 10 Operation Summary Report Common Well Name.F-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/29/2014 End Date:12/7/2014 X3-015YJ-C:(4,415,342.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292164900 Active datum:ORKB @66.71 usft(above Mean Sea Level) Date From-To Hrs Task I Code NPT I NPT Depth Phase I Description of Operations (hr) (usft) 22:30 - 23:30 1.00 STWHIP P WEXIT PJSM AND PU MILLING ASSEMBLY -PU MILL,STRING MILL,2-1/8"XTREME MOTOR WSLAND BTT REP GAGE MILL,2.74 GO,2.73 NO-GO -PU 2 JTS 2-1/16"CSH -PU 2-3/8"COILTRAK GET ON WELL,PRESS TEST QTS 23:30 - 00:00 0.50 STWHIP P WEXIT RIH WITH MILLING ASSEMBLY -1,00'/MIN WITH 0.47/0.85 BPM IN/OUT -RIH TO 3500'MD 12/2/2014 00:00 - 01:30 1.50 STWHIP P WEXIT CONTINUE RIH WITH MILLING ASSEMBLY 100'/MIN WITH 0.47/0.85 BPM IN/OUT -TIE-IN WITH-10'CORRECTION -DRY TAG WHIPSTOCK AT 9120'MD -PU AND COME ONLINE WITH 1.50 BPM IN/OUT -TAG WHIPSTOCK AT 9120.4'MD AND STALL OUT -PU AND TAG WHIPSTOCK AT 9120.1'MD 01:30 - 09:00 7.50 STWHIP P WEXIT MILL WINDOW FROM 9120'TO 9125'MD ' -FS:3350 PSI MTR WRK:100-200 PSI WOB: 1.0-2.0K# -BPM IN/OUT:1.52/1.52 PVT:111 BBLS -MW IN/OUT:9.55/9.45 PPG _ -ECD/IA/OA:10.32 PPG/382 PSI/178 PSI 09:00 - 11:30 2.50 STWHIP P WEXIT MILL NEW FORMATION F/9125'-9135'MD -BPM IN/OUT:1.51/1.51 CIRC PSI:3375 -MW IN/OUT:9.50 PPG/9.41 PPG -IA/OA/PVT:380 PSI/504 PSI/115 BBLS -ECD/ANN PSI:10.29 PPG/4709 PSI -SEE 50%CHERT/50%SAND IN SAMPLES 11:30 - 13:00 1.50 STWHIP P WEXIT DRESS AND DRIFT WINDOW -REAM UP AT V/MIN,THEN DOWN AND UP 3X AT 1'/MIN -DRY DRIFT WINDOW,WINDOW CLEAR 13:00 - 15:00 2.00 STWHIP P t WEXIT POOH WITH THE MILLING ASSEMBLY -FLOW CHECK OFF BOTTOM,NO FLOW -90'/MIN WITH 1.70/1.35 BPM IN/OUT ...1.-.FLOW CHECK AT SURFACE,NO FLOW 15:00 - 15:30 0.50 STWHIP P WEXIT PJSM AND LD MILLING ASSEMLBY 1-POP OFF,STAND BACK INJECTOR -BLOW DOWN TOOLS,LD 2-3/8"COILTRAK -LD 2 JTS 2-1/16"CSH LD MOTOR AND MILLS -WSLAND BTT REP GAUGE MILLS 1-WINDOW MILL:2.74 GO,2.73 NO GO. I-STRING REAMER:2.74 GO,2.73 NO GO. 15:30 - 16:00 0.50 DRILL N SFAL PROD1 PJSM AND REPLACE LEAKING REEL SWIVEL 16:00 - 16:45 0.75 DRILL P PROD1 PJSM AND PU BUILD ASSEMBLY -PU 2-3/8"ULS MOTOR W/1.95 AKO -PU NEW HUGHES 3.25"BI-CENTER PU 2-3/8"COILTRAK W/O RESISTIVITY -GET ON WELL,PRESS TEST OTS 16:45 - 18:45 2.00 DRILL P PROD1 RIH W/BUILD BHA F/61'TO 9135'MD AT 100 FPM. -0.61/0.97 BPM IN/OUT W/1350 PSI -LOG TIE-IN W/-11'CORRECTION Printed 12/15/2014 3:15:29PM North America-ALASKA-BP Page 6 of 10 Operation Summary Report Common Well Name:F-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/29/2014 End Date:12/7/2014 X3-015YJ-C:(4,415,342.00) Project Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor.NORDIC CALISTA UWI:500292164900 Active datum:ORKB @66.71usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:45 - 22:30 3.75 DRILL P PROD1 DRILL 3-1/4"BUILD SECTION F/9135' -NBI 43° -ROP 30'/HR -BPM IN/OUT:1.53/1.53 -CIRC PSI:3385 PSI -ECD:10.35 PPG(OBD) -MW IN/OUT:9.50 PPG/9.42 PPG 1A/OA/PVT:287 PSI/444 PSI/266 BBLS -DHWOB:1.00K LBS-2.5K LBS -DRILL TO 9250'MD 22:30 - 00:00 1.50 DRILL N DPRB 9,250.00 PROD1 POOH TO DIAL UP MOTOR BEND -ONLY ACHIEVING 24DEG DOGLEGS,NEED 28'S I-CANNOT ASSURE LANDING ABOVE 13N SHALE -NOTIFY AND CONSULT WITH TOWN GEO -DECIDE TO POOH AND DIAL UP MOTOR WIPER BACK TO WINDOW -30'/MIN WITH 1.50/1.37 BPM IN/OUT -PULL INTO WINDOW,OPEN EDC -FLOW CHECK,NO FLOW POOH WITH BUILD ASSEMBLY ' -100'/MIN WITH 1.90/1.50 BPM IN/OUT POOH TO 4600'MD 12/3/2014 00:00 - 01:00 1.00 DRILL N DPRB 9,250.00 PROD1 CONTINUE POOH WITH BUILD ASSEMBLY F/ 4600'MD -100'/MIN WITH 1.90/1.50 BPM IN/OUT -FLOW CHECK AT SURFACE,NO FLOW 01:00 - 01:30 0.50 DRILL N DPRB 9,250.00 PROD1 PJSM AND LD BUILD ASSEMBLY -POP OFF,STAND BACK INJECTOR i-STAND BACK 2-3/8"COILTRAK -LD MOTOR AND BIT -BIT GRADE:4-1-RO-N-X-I-CT-BHA -DIAL UP MOTOR FROM 1.95 TO 2.3 AKO 01:30 - 02:30 1.00 DRILL N DPRB 9,250.00 PROD1 PJSM AND PU BUILD ASSEMBLY -PU 2-3/8"ULS MOTOR W/2.3 AKO -PU NEW HUGHES 3.25"BI-CENTER -PU 2-3/8"COILTRAK W/O RESISTIVITY -GET ON WELL,PRESS TEST QTS 02:30 - 04:30 2.00 DRILL N DPRB 9,250.00 PROD? RIH WITH BUILD ASSEMBLY TO 8635'MD -100'/MINWITH 0.51/0.89 BPM IN/OUT 04:30 - 06:45 2.25 DRILL P PROD1 PERFORM LONG TIE-IN WITH-10.5' CORRECTION 1-LOG RA TAG AT 9125'MD -TOW:9120'MD,BOW:9125'MD -CONTINUE RIH TO BOTTOM 06:45 - 10:30 3.75 DRILL P PROD1 DRILL 3-1/4"BUILD SECTION F/9250' -NBI 43° -ROP 70'/HR -BPM IN/OUT:1.48/1.49 -CIRC PSI:3315 PSI I-ECD:10.35 PPG(OBD) MW IN/OUT:9.52 PPG/9.44 PPG -IA/OA/PVT:287 PSI/403 PSI/264 BBLS -DHWOB:0.64K LBS-2.5K LBS -DRILL TO 9370'MD 10:30 - 11:30 1.00 DRILL P PROD1 POH W/3-1/4"BUILD BHA#5 F/9370'TO 9100' 'CIRCULATING ALL SAMPLES OUT OF HOLE PUMPING 1.48 BPM W/3150 PSI. 11:30 - 13:00 1.50 DRILL P PROD1 CONTINUE TO POH W/9100'TO 61'AT 100 FPM PUMPING 2.0 BPM THROUGH OPEN EDC. Printed 12/15/2014 3.15:29PM North America-ALASKA-BP Page 7 of 10 Operation Summary Report Common Well Name:F-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/29/2014 End Date:12/7/2014 X3-015YJ-C:(4,415,342.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292164900 Active datum:ORKB @66.71 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 13:30 0.50 DRILL P PROD1 PJSM AND LD BUILD ASSEMBLY -POP OFF,STAND BACK INJECTOR -LD 2-3/8"COILTRAK -LD MOTOR AND BIT -BIT GRADE:1-1-NO-A-X-I-BU-BHA -DIAL DOWN MOTOR FROM 2.3°TO 0.94°AKO 13:30 - 14:15 0.75 DRILL P PROD1 PJSM AND PU LATERAL ASSEMBLY -PU 2-3/8"ULS MOTOR W/0.94°AKO -RE-RUN HUGHES 3.25"BI-CENTER -PU 2-3/8"COILTRAK W/RESISTIVITY -GET ON WELL,PRESS TEST QTS 14:15 - 16:30 2.25 DRILL P PROD1 RIH WITH BUILD ASSEMBLY -100'/MIN WITH 0.40/0.78 BPM IN/OUT LOG TIE-IN W/-10.5'CORRECTION 16:30 - 18:00 1.50 DRILL P PROD1 DRILL 3-1/4"BUILD SECTION F/9370' -NBI 90° -ROP 18'/HR -BPM IN/OUT:1.48/1.49 -CIRC PSI:3315 PSI -ECD:10.35 PPG(OBD) -MW IN/OUT:9.52 PPG/9.44 PPG -IA/OA/PVT:287 PSI/403 PSI/264 BBLS -DHWOB:0.64K LBS-2.5K LBS -DRILL TO 9410'MD 18:00 - 00:00 6.00 DRILL P PROD1 DRILL AHEAD F/9,410'T/9,675'MD -FS:3150 PSI MTR WRK:200-300 PSI WOB: 1.0-2.0K# -BPM IN/OUT:1.48/1.48 PVT:345 BBLS -MW IN/OUT:9.52/9.48 PPG -SURFACE WT:19K# ECD/IA/OA:10.40 PPG/380 PSI/658 PSI 12/4/2014 00:00 - 04:30 4.50 DRILL • P PROD1 DRILL AHEAD F/9,675'T/9,850'MD -FS:3350 PSI MTR WRK:200-300 PSI WOB: 1.0-2.0K# • -BPM IN/OUT:1.57/1.57 PVT:342 BBLS -MW IN/OUT:9.52/9.48 PPG -SURFACE WT:18K# • -ECD/IA/OA:10.44 PPG/382 PSI/720 PSI -FOLLOW WIPER STRATEGY PER WELLPLAN 04:30 - 06:00 1.50 DRILL P PROD1 WIPER TO WINDOW,MAD PASS BUILD SECTION -25'/MIN WITH 1.51/1.41 BPM IN/OUT TO 9350'MD -MAD PASS BUILD SECTION AT 200'/HR -TIE-IN WITH+2'CORRECTION 06:00 - 07:00 1.00 DRILL P PROD1 WIPER TO BOTTOM -25'/MIN WITH 1.51/1.61 BPM IN/OUT 07:00 - 21:30 14.50 DRILL P PROD1 DRILL AHEAD El 9,850'T/10,300'MD -FS:3350 PSI MTR WRK:200-300 PSI WOB: 1.0-2.OK# -BPM IN/OUT:1.56/1.56 PVT:238 BBLS -MW IN/OUT:9.63/9.55 PPG -SURFACE WT:19K# -ECD/IA/OA:10.44 PPG/382 PSI/720 PSI -FOLLOW WIPER STRATEGY PER WELLPLAN -PERFORM MUD SWAP WHILE DRILLING AHEAD AT 10,100'MD 21:30 - 22:30 1.00 DRILL P PROD1 WIPER TO WINDOW -20'/MIN WITH 1.55/1.47 BPM IN/OUT -TRIP OOH SMOOTH -TIE-IN TO RA-TAG WITH+3.5'CORRECTION Printed 12/15/2014 3:15:29PM North America-ALASKA-BP Page 8 of Operation Summary Report Common Well Name:F-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/29/2014 End Date:12/7/2014 X3-015YJ-C:(4,415,342.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor NORDIC CALISTA UWI:500292164900 Active datum:ORKB @66.71usft(above Mean Sea Level) Date From-To firs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:30 - 23:30 1.00 DRILL P PROD1 LOG CCL FOR TOL PLACEMENT -PULL INTO WINDOW,OPEN EDC -POOH TO 8200'MD -LOG CCL DOWN 8200'-8400'MD SENSOR (DEPTH -1000'HR WITH 2.15/2.22 BPM IN/OUT -RIH TO WINDOW AND CLOSE EDC 23:30 - 00:00 0.50 DRILL P PROD1 WIPER TO BOTTOM 30'/MIN WITH 1.53/1.63 BPM IN/OUT 12/5/2014 00:00 - 00:30 0.50 DRILL P PROD1 CONTINUE WIPER TO BOTTOM 30'/MIN WITH 1.53/1.63 BPM IN/OUT STACK WT AT 10,201'MD.PU AND RUN PAST WITH PUMPS AT 1.00 BPM. -PUMP 10 BBL LO-VIS SWEEP WHEN BACK ON BOTTOM. 00:30 - 10:30 10.00 DRILL P PROD1 DRILL AHEAD F/10,300'T/10,750'MD -FS:3400 PSI MTR WRK:200-500 PSI WOB: 1.5-2.5K# -BPM IN/OUT:1.53/1.53 PVT:304 BBLS -MW IN/OUT:9.64/9.57 PPG -SURFACE WT:16K# ECD/IA/OA:10.84 PPG/415 PSI/131 PSI FOLLOW WIPER STRATEGY PER WELLPLAN UTILIZE SWEEPS TO CLEAN HOLE 10:30 11:45 1.25 DRILL P PROD1 WIPER TO WINDOW PUMP 10 BBP LOW-VIS SWEEP ON BOTTOM -25'/MIN WITH 1.61/1.48 BPM IN/OUT -TRIP OOH SMOOTH -TIE-IN TO RA-TAG WITH+6.0'CORRECTION 11:45 - 13:00 1.25 DRILL P PROD1 WIPER TO BOTTOM -20'/MIN WITH 1.58/1.63 BPM IN/OUT -SET 10KLBS DOWN AT 10,200'MD POPPED THROUGH WITHOUT PU. -COIL WT 20KLBS 13:00 18:00 5.00 DRILL P PROD1 DRILL AHEAD F/10,750'T/11,045'MD -FS:3500 PSI MTR WRK:300-500 PSI WOB: 1.5-2.5K# -BPM IN/OUT:1.58/1.58 PVT:333 BBLS -MW IN/OUT:9.67/9.59 PPG -SURFACE WI:14K# -ECD/IA/OA:10.88 PPG/417 PSI/155 PSI -FOLLOW WIPER STRATEGY PER WELLPLAN -UTILIZE SWEEP S TO CLEAN HOLE 18:00 - 21:30 3.50 DRILL P PROD1 DRILL AHEAD F/11,045'T/11,230'MD -FS:3500 PSI MTR WRK:300-500 PSI WOB: 1.5-3.OK# -BPM IN/OUT:1.57/1.54 PVT:330 BBLS -MW IN/OUT:9.67/9.64 PPG -SURFACE WT:12K# -ECD/IA/OA:10.87 PPG/402 PSI/162 PSI -FOLLOW WIPER STRATEGY PER WELLPLAN -UTILIZE SWEEPS TO CLEAN HOLE 21:30 - 23:00 1.50 DRILL P PROD1 WIPER TO WINDOW -PUMP 10 BBP LOW-VIS SWEEP ON BOTTOM -25'/MIN WITH 1.47/1.34 BPM IN/OUT -SLOW PUMP TO 0.5 BPM 10,250-10,150'MD -TIE-IN TO RA-TAG WITH+4.5'CORRECTION Printed 12/15/2014 3:15:29PM North America-ALASKA-BP Page 9 of 10 Operation Summary Report Common Well Name:F-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/29/2014 End Date:12/7/2014 X3-015YJ-C:(4,415,342.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/19/1986 12:00:OOAM Rig Release: Rig Contractor NORDIC CALISTA UWI:500292164900 Active datum:ORKB @66.71usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:00 - 00:00 1.00 DRILL P PROD1 WIPER TO BOTTOM -25'/MIN WITH 1.51/1.58 BPM IN/OUT -STACK-5K#AT 9800'MD,POP THRU -REDUCE PUMPS TO 0.85/0.91 BPM IN/OUT THRU SHALES -WIPER TO 10,300'MD 12/6/2014 00:00 - 00:30 0.50 DRILL P PROD1 CONTINUE WIPER TO BOTTOM 25'/MIN WITH 1.51/1.58 BPM IN/OUT -REDUCE PUMPS TO 0.85/0.91 BPM IN/OUT THRU SHALES 00:30 - 04:30 4.00 DRILL P PROD1 DRILL AHEAD F/11,230'T/11,450'MD -FS:3500 PSI MTR WRK:300-500 PSI WOB: 1.5-3.OK# -BPM IN/OUT:1.57/1.54 PVT:330 BBLS -MW IN/OUT:9.67/9.64 PPG -SURFACE WT:-5 TO+15K# ECD/IA/OA:10.87 PPG/402 PSI/162 PSI -FOLLOW WIPER STRATEGY PER WELLPLAN UTILIZE SWEEPS TO CLEAN HOLE 04:30 - 10:30 6.00 DRILL P PROD1 DRILLING AHEAD WHILE PERFORM MUD SWAP FROM 11,450'MD TO 11,704'MD -CANNOT KEEP POSITIVE SURFACE WT AND DIFFICULTY SLIDING. -SWAP MUD SYSTEM TO NEW 9.5 PPG POWERPRO. -FS:3300 PSI MTR WRK:200-300 PSI WOB: 1.0-2.0K# -BPM IN/OUT:1.64/1.61 PVT:329 BBLS -MW IN/OUT:9.64/9.61 PPG -SURFACE WT:8-12K# -ECD/IA/OA:10.89 PPG/374 PSI/133 PSI 10:30 - 12:15 1.75 DRILL P PROD1 WIPER TO WINDOW -PUMP 10 BBP LOW-VIS SWEEP ON BOTTOM -25'/MIN WITH 1.58/1.45 BPM IN/OUT -TIE-IN TO RA-TAG WITH+6'CORRECTION 12:15 - 14:00 1.75 DRILL P PROD1 WIPER TO BOTTOM -25'/MIN WITH 1.65/1.72 BPM IN/OUT -COIL WEIGHT WHILE RIH:17 TO 20 KLBS -REDUCE PUMPS TO 0.37/0.45 BPM IN/OUT F/10,150'TO 10,250'MD 14:00 - 18:00 4.00 DRILL P PROD1 DRILL AHEAD F/11,704'T/12,020'MD• -FS:3700 PSI MTR WRK:300-500 PSI WOB: 1.5-3.0K# -BPM IN/OUT:1.66/1.65 PVT:330 BBLS -MW IN/OUT:9.64/9.53 PPG -SURFACE WT:6-15K# -ECD/IA/OA:10.98 PPG/391 PSI/155 PSI -FOLLOW WIPER STRATEGY PER WELLPLAN UTILIZE SWEEPS TO CLEAN HOLE 18:00 - 21:30 3.50 DRILL P PROD1 DRILL AHEAD F/12,020'T/12,200'MD -FS:3700 PSI MTR WRK:200-400 PSI WOB: 1.5-3.0K# -BPM IN/OUT:1.63/1.61 PVT:291 BBLS -MW IN/OUT:9.68/9.63 PPG -SURFACE WT:-5 TO+3K# -ECD/IA/OA:11.04 PPG/400 PSI/167 PSI -FREQUENT WIPERS TO KEEP WT TRANSFER -CALL TD AT 12,200'MD PER OCN.REACH END OF POLYGON. Printed 12/15/2014 3:15:29PM North America-ALASKA-BP Page 10 of 10 Operation Summary Report Common Well Name:F-28 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:11/29/2014 End Date:12/7/2014 X3-015YJ-C:(4,415,342.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292164900 Active datum:ORKB @66.71 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:30 - 00:00 2.50 DRILL P PROD1 WIPER TO WINDOW -25'/MIN WITH 1.61/1.48 BPM IN/OUT WIPER TO BOTTOM -30'/MIN WITH 1.48/1.56 BPM IN/OUT REDUCE PUMPS TP 0.77/.87 THRU SHALES WIPER TO 10,100'MD 12/7/2014 00:00 - 01:30 1.50 DRILL P PROD1 CONTINUE WIPER TO BOTTOM -30'/MIN WITH 1.48/1.56 BPM IN/OUT -REDUCE PUMPS TP 0.77/0.87 BPM IN/OUT THRU SHALES TRIP TO BOTTOM SMOOTH 01:30 - 05:00 3.50 DRILL P PROD1 WIPER TO WINDOW -PUMP 30 BBL LO-VIS SWEEP ON BOTTOM -30'/MIN WITH 1.67/1.53 BPM IN/OUT -TIE-IN WITH+11'CORRECTION WIPER TO BOTTOM -30'/MIN WITH 1.52/1.62 BPM IN/OUT -REDUCE PUMPS TP 0.68/0.76 BPM IN/OUT THRU SHALES TRIP TO BOTTOM SMOOTH TAG BOTTOM AT 12,201'MD. PU AND RE-TAG.CONFIRM DEPTH 12,201' MD. 05:00 08:30 3.50 DRILL P PROD1 POOH LAYING IN LINER RUNNING PILL -30'/MIN WITH 0.45/0.25 BPM IN/OUT -PULL INTO WINDOW,OPEN EDC POOH WITH DRILLING ASSEMBLY -PAINT EOP FLAGS AT 8000'AND 4100'EOP 08:30 - 09:30 1.00 DRILL P PROD1 PJSM AND LD DRILLING ASSEMBLY -POP OFF,STAND BACK INJECTOR -LD 2-3/8"COILTRAK WITH RES -LD MOTOR AND BIT -BIT GRADE:2-1-RO-N-X-I-BT-TD END RON EVENT AND BEGIN CON EVENT AT 09:30 ON 12/07/2014. Printed 12/15/2014 3:15:29PM North America-ALASKA-BP Page 1 of 6 Operation Summary Report Common Well Name:F-28 AFE No Event Type:COM-ONSHORE(CON) Start Date:12/7/2014 End Date: X3-015YJ-C:(1,389,308.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/19/1986 12:00:OOAM Rig Release: Rig Contractor NORDIC CALISTA UWI:500292164900 Active datum:ORKB©66.71 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12/7/2014 09:30 - 10:00 0.50 CASING P RUNPRD FUNCTION TEST BOPE FROM DRILLERS REMOTE PANEL. 10:00 - 11:45 1.75 CASING P RUNPRD PUMP OUT SLACK -PUMP OUT 238'SLACK.291'CALCULATED. 53'SLACK STILL IN REEL. CUT AND BOOT E-LINE -CIRCULATE 3/4"BALL TO CIRC SUB. -RECOVER BALL. 11:45 - 12:45 1.00 CASING P RUNPRD INSTALL BTT COIL CONNECTOR -REMOVE SLB COIL CONNECTOR -MU BTT COIL CONNECTOR TO 2"COIL -PULL/PRESSURE TEST 35K/4000 PSI 12:45 - 13:30 0.75 CASING P RUNPRD PLACE INJECTOR ON LEGS OVER BUNG HOLE&SECURE INJECTOR W/STRAP. RU 2-3/8"SLIP TYPE ELEVATORS. RU SLB TONGS. 13:30 - 20:30 7.00 CASING P RUNPRD PJSM MU 2-3/8"LINER PER PLAN -RUN BULL NOSE AND 2-3/8"SHOE TRACK JOINT WITH FLOAT EQUIPMENT. -RUN 42 JTS 2-3/8"4.7#TH-511 L-80 LINER W/ CMTLS PU RA MARKER PUP RUN 53 JTS 2-3/8"4.7#TH-511 L-80 LINER W/ CMTLS -RUN 30 JTS 2-3/8"4.7#TH-511 L-80 LINER W/O CMTLS -FILL EVERY 20 JTS 20:30 - 22:00 1.50 CASING P RUNPRD PJSM AND PU LINER RUNNING TOOLS -PU DEPLOYMENT SLEEVES AND LRT -PU 3 JTS 2-1/16"CSH -GET ON WELL,PRESS TEST QTS -CIRC TO CLEAR AIR FROM LINER 22:00 - 00:00 2.00 CASING P RUNPRD RIH WITH 2-3/8"LINER -80'/MIN WITH 0.34/0.63 BPM IN/OUT -SLOW TO 30'/MIN THRU JEWELRY 8300'- 6500'MD -SEE FLAG AT 8969'MD(-21'CORRECTION). DO NOT CORRECT. -TAKE UP WT AT WINDOW=37K,DOWN WT= 25K -50'/MIN IN OPEN HOLE WITH 0.33/0.51 BPM IN/OUT -RIH TO 10,300'MD -NO LOSSES WHILE RIH 12/8/2014 00:00 - 01:00 1.00 CASING P RUNPRD CONTINUE RIH WITH 2-3/8"LINER -50'/MIN IN OPEN HOLE WITH 0.33/0.51 BPM IN/OUT. -TRIP TO BOTTOM SMOOTH. -NO LOSSES WHILE RIH -SEE FLAG AT 12,067'MD(-19'CORRECTION). DO NOT CORRECT. -TAG BOTTOM AT 12,213'MD(12,194'MD CORRECTED). -STACK DOWN 10K#TO 12,214'MD. -TAKE UP WT=45K BREAKOVER AT 12,201' MD. -RIH AND STACK DOWN 10K#AT 12,213'MD. Printed 12/15/2014 3:16:07PM North America-ALASKA-BP Page 2 of 6 Operation Summary Report Common Well Name:F-28 AFE No Event Type:COM-ONSHORE(CON) Start Date:12/7/2014 End Date: X3-015YJ-C:(1,389,308.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor NORDIC CALISTA UWI:500292164900 Active datum:ORKB©66.71usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:00 - 01:30 0.50 CASING P RUNPRD PJSM AND RELEASE FROM LINER -LAUNCH 5/8"BALL. -CIRC BALL TO SEAT WITH 1.55/1.53 BPM IN/OUT AND 3500 PSI. -LAND BALL WITH 27 BBLS AWAY. -PRESSURE UP TO 4500 PSI AND RELEASE FROM LINER. -PU TO BREAKOVER AT 25K#AND 3'TO CONFIRM RELEASED. -RIH AND STACK DOWN 10K#AT 12,213'MD. 01:30 - 03:30 2.00 CEMT P RUNPRD PJSM AND DISPLACE WELL TO 1%KCL -CIRC 9.6 PPG MUD:1.50/1.48 BPM IN/OUT W/3500 PSI -DISPLACE WELL TO KCL AT 2 BPM -CIRC 8.4 PPG KCL:1.50/1.42 BPM IN/OUT _ W/2000 PSI 03:30 - 05:00 1.50 CEMT P RUNPRD RIG UP CEMENT UNIT,PREP PITS FOR CEMENT -STAGE CEMENT UNIT,RIG UP HARD LINE -SUCK OUT 9.6 PPG POWERPRO FROM PITS -STAGE KCL,EXHAUST PILL,AND CONTAM PILL TRUCKS 05.00 - 06:00 1.00 CEMT P RUNPRD PJSM AND PRESS TEST CEMENT UNIT -PRESS TEST TO 250/6500 PSI,GOOD TEST -WSL PERFORM PRESSURE CROSSCHECK CHECKLIST WITH PUMP TRUCK OPERATOR -WSL WITNESS PRESS TEST AND VERIFY TRIPS FUNCTION 06:00 - 07:00 1.00 CEMT P RUNPRD CREW CHANGE,AND MOVE VAC TRUCKS TO POSITIONS TO DISPLACE WITH RIG PUMPS. 07:00 - 08:15 1.25 CEMT P RUNPRD PJSM AND BATCH MIX 20 BBL OF 15.3 PPG CEMENT. Printed 12/15/2014 3:16:07PM North America-ALASKA-BP Page sof 6 Operation Summary Report Common Well Name:F-28 AFE No Event Type:COM-ONSHORE(CON) Start Date:12/7/2014 End Date: X3-015YJ-C:(1,389,308.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292164900 Active datum:ORKB @66.71usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:15 - 10:00 1.75 CEMT P RUNPRD CEMENT 2-3/8"PRODUCTION LINER -LOAD 18.4 BBLS CEMENT INTO COIL REEL 1.5 BPM W/4000 PSI. -DISPLACE CEMENT WITH RIG PUMPS PER PUMING SCHEDULE,SLOW PUMPS TO 3/4 BPM F/37.0 BBL TO 41.0 BBL. ZERO OUT MM AT 54.5 BBL ON IN MM 2307 PSI. -SHUT DOWN PUMP AT 55.7 BBL IN 2250 PSI. -PU F/12,213.4'TO 12,194.4'MD AND SIDE EXHAUST 2 BBLS CEMENT+3 BBLS ;EXHAUST FLUID AT 1.5 BPM W/1850 PSI -PRESSURE UP TO 2000 PSI(ZERO MM IN) -LAUNCH WIPER PLUG AT @ 3400 PSI -MANUAL STRAP OF PITS:85 BBLS -DISPLACE 15.1 BBLS @ 1.51 BPM:FINAL CIRCULATING PRESSURE AT 1.51 BPM 4350 PSI -BUMP PLUG TO 4650 PSI AT 15.1 BBL. PUMPS TRIPPED OUT JUST AFTER BUMPING. -FINAL MANUAL STRAP OF PITS:107 BBL -FINAL OUT MM:20.0 BBL PU CHECK FLOATS:FLOATS HELD UNSTING FROM LINER ASSEMBLY AND CIRCULATE 5 BBLS CEMENT IN PLACE AT 09:49 CEMENT BEHIND PIPE: BASED ON MM:15.0 BBL BASED ON PIT STRAP:17.0 BBL 10:00 - 12:00 2.00 CEMT P RUNPRD POH W/LINER RUNNING TOOLS -100 FPM,1.13/0.73 BPM IN/OUT 12:00 - 13:00 1.00 CEMT P RUNPRD PJSM AND LD LINER RUNNING TOOLS -POP OFF,STAND BACK INJECTOR LD 3 JTS 2-1/16"CSH LD LINER RUNNING TOOLS,ALL PINS SHEARED -RECOVER 5/8"BALL 113:00 - 18:00 5.00 BOPSUR P OTHCMP PJSM AND C/O 2-3/8"COMBIS TO 1"CSH RAMS -SET TEST PLUG -LEAK TIGHT TEST TREE VALVES -C/O RAMS TO 1.0"CSH RAMS -SHELL TEST TO 250/3500 PSI FOR 5/5,GOOD -TEST RAMS TO 250/3500 PSI FOR 5/5 MIN, GOOD -TEST ANNULAR TO 250/2500 PSI FOR 5/5 MIN,GOOD -PULL TEST PLUG 18:00 - 18:30 0.50 EVAL P OTHCMP ALL FOR CREW CHANGEOUT PERFORM PRE-TOUR WALKAROUNDS 18:30 - 19:30 1.00 EVAL P OTHCMP DISCUSS AND REVIEW PLAN FORWARD -REVIEW 1"CSH TALLY -DISCUSS LOGGING SCHEDULE -PROGRAM TOOLS FOR LOGGING -LOCATE AND IDENTIFY ALL EQUIPMENT FOR LOGGING ASSEMBLY -COMPLETE BHA SUMMARY FOR LOGGING ASSEMBLY Printed 12/15/2014 3:16:07PM North America-ALASKA-BP Page 4 of 6 Operation Summary Report Common Well Name:F-28 AFE No Event Type:COM-ONSHORE(CON) Start Date:12/7/2014 End Date: X3-015YJ-C:(1,389,308.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor NORDIC CALISTA UWI:500292164900 Active datum:ORKB @66.71 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:30 - 20:00 0.50 EVAL P OTHCMP PJSM AND LOAD LOGGING TOOLS BRING LOGGING TOOLS UP BEAVER SLIDE -RIG UP BAKER ATLAS ENCODER CABLE 20:00 - 00:00 4.00 1 EVAL P OTHCMP PJSM AND PU LOGGING ASSEMBLY PU LOGGING TOOLS,INITIALIZE LOGGING SHEDULE -RIH WITH LOGGING TOOLS ON 128 JTS 1" CSH -PU 2 JTS 2-1/16 CSH -GET ON WELL,PRESS TEST QTS LOGGING PROGRAM: 20:52-INITIALIZE TOOL 00:52-TOOLS TURN ON 01:10-TOOLS WARM UP,READY TO LOG 09:52-TOOLS TURN OFF 10:30-TOOLS SAFE TO PULL ABOVE 300' 12/9/2014 00:00 - 01:00 1.00 EVAL P OTHCMP RIH WITH LOGGING ASSEMBLY -RIH FROM 4154'MD TO 8100'MD -CHECK BAKER ATLAS ENCODER DEPTH AT 6000'MD,GOOD. -85'/MIN WITH 0.35/0.66 BPM IN/OUT 01:00 - 03:45 2.75 EVAL P OTHCMP 'LOG DOWN FROM 8100'MD TO PBTD WAIT UNTIL 01:10 FOR TOOLS TO WARM UP LOG DOWN 25-30'/MIN WITH 0.34/0.43 BPM IN/OUT TAG PBTDAT 12,174'MD UNCORRECTED 03:45 - 07:30 3.75 EVAL P OTHCMP LOG UP FROM PBTD TO 8100'MD -15-20'/MIN WITH 0.37/0.29 BPM IN/OUT -LAY IN 100K LSRV PERF PILL INSIDE LINER 07:30 - 08:30 1.00 EVAL P OTHCMP CONTINUE TO POH W/LOGGING BHA F/8100' TO 4154'. -60 FPM 1.50/1.25 BPM IN/OUT -DISPLACE EXHAUST PILL F/WELL WITH CLEAN 1%KCL 08:30 - 13:45 5.25 EVAL P OTHCMP PJSM.P01-1F/4154'TO SURFACE -POP OFF AND STAND INJECTOR ON LEGS -POH AND L/D 44 JTS 1"CSH. POH AND RACK BACK44 STANDS 1"CSH IN DERRICK. -L/D RPM TOOLS AND OFFLOAD FROM PIPE SHED. -DOWNLOAD RPM DATA. CONFIRM PBTDAT 12,159'MD. 13:45 - 21:10 7.42 PERFOB P OTHCMP PJSM.LOAD GUNS IN PIPE SHED. -WSL VERIFIES PROPER ORDER AND INSPECTS GUNS WITH PERFORATING HAND. -PJSM WITH ALL HANDS WITH REGARD TO PICK UP PERF GUNS. -FLOW CHECK WELL,WELL STABLE. RUN 59 GUNS,MAKE UP FIRING HEAD AND CROSSOVER. -RIH W/ 10 JTS 1"CS HYDRILTBG,MARKER PUP AND 88 JTS 1"CS HYDRIL TUBING. -HI LOAD DISCO,DUAL BPV,(2)JTS 2 1/16" HYDRIL TBG,BAKER QUICK CONNECT AND ASSOCIATED X OVERS. -OVERALL LENGTH=4121.48'. Printed 12/15/2014 3:16:07PM North America-ALASKA-BP Page 5 of 6 Operation Summary Report Common Well Name:F-28 AFE No Event Type:COM-ONSHORE(CON) Start Date:12/7/2014 End Date: X3-015YJ-C:(1,389,308.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292164900 Active datum:ORKB @66.71 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:10 - 23:33 2.38 PERFOB P OTHCMP RIH WITH BHA#9,PERF BHA. PVT=125BBLS. CIRC 0.39BPM/750PSI. STOP AT FLAG. CONTINUE TO RIH.RIW=18K,PUW=34K TAG PBTD,PUH TO BREAK OVER.CORRECT TO PBTD(4)12159'. PUH TO 12143'. 23:33 - 23:55 0.37 PERFOB P OTHCMP RU SHOT DETECTOR. PERFORM PUMP SEQUENCE. 23:55 - 23:56 0.02 PERFOB P OTHCMP PERFORM DRIVE BY PERFORATING USING 1.56"6SPF PJ GUNS. PERFORATE WITH GOOD INDICATION FROM; 10,90U-11,45W 11,600'-11,700' 11,850;-12,140' 23:56 - 00:00 0.07 PERFOB P OTHCMP POH HOLDING 200PSI WHP. PVT=151. 12/10/2014 00:00 - 01:40 1.67 PERFOB P OTHCMP CONTINUE TO POH.HOLD 200 WHP. 01:40 - 01:50 0.17 PERFOB P OTHCMP 'FLOW CHECK AT TOL-NO FLOW. 01:50 - 02:50 1.00 PERFOB P OTHCMP CONTINUE TO POH.LOST 14BBLS ON TRIP OOH. 02:50 - 02:55 0.08 PERFOB P OTHCMP FLOW CHECK AT SURFACE-NO FLOW. 02:55 - 05:45 2.83 PERFOB' P OTHCMP POP OFF WELL.STAND BACK INJECTOR& PLACE OVER BUNG HOLE.LD 2-1/16"CSH.LD CSH SIDEWAYS. 05:45 - 06:45 1.00 PERFOB P OTHCMP STOP AT CSH MARKER JOINT.RU SLB FARR TONGS. 06:45 - 09:45 3.00 PERFOB P OTHCMP CONTINUE TO POH AND LD 10 X JTS 1"CSH AND 59 PERF GUNS. 09:45 - 10:00 0.25 PERFOB P. . OTHCMP RD FARR TONGS AND GUN RUNNING EQUIPMENT. CLEAN AND CLEAR RIG FLOOR. 10:00 - 14:00 4.00 WHSUR N SFAL POST WAIT ON LRS. LRS WAS CALLED OUT FOR 09:30 W/45 BBL OF HEATED DIESEL. THEY DID NOT ARRIVE ON LOCATION UNTIL AFTER 10:15,AND THE DIESEL STILL NEEDED TO BE HEATED. WHILE HEATING THE DIESEL,THE BURNER ON THE LRS TRUCK WENT OUT. WAIT FOR ANOTHER LRS TRUCK TO COME TO LOCATION,TRANSFER DIESEL FROM THE FIRST TRUCK,AND THEN HEAT THE DIESEL 14:00 - 16:00 2.00 WHSUR P POST PJSM. SPOT NEW LRS TRUCK -LINE UP AND BULLHEAD 45 BBL OF 60°F I DIESEL THROUGH THE KILL LINE -PUMP RATE 0.75 TO 1.75 BPM -WHP 3150 TO 3450 PSI. -R/D LRS TRUCK 16:00 - 17:45 1.75 WHSUR P POST PJSM.RU TO BLOW DOWN REEL%NTH N2. -SPOT MEOH PUP -SPOT AND RU N2 TRUCK -RU N2 TRUCK AND COOL DOWN 17:45 - 19:00 1.25 WHSUR P POST PRESSURE TEST N2 LINES -LOWEST PRESSURE RATED COMPONENT IN SYSTEM IS MICROMOTION AT 4790 PSI. -MICROMOTION WILL BE BYPASSED DURING BLOWDOWN N2 PUMP TRIPS SET AND TESTED TO 4500 j PSI I j-PRESSURE TEST LINES TO 250/4500 PSI Printed 12/15/2014 3:16:07PM North America-ALASKA-BP Page 6 of 6 Operation Summary Report Common Well Name:F-28 AFE No Event Type:COM-ONSHORE(CON) Start Date:12/7/2014 End Date: 'X3-015YJ-C:(1,389,308.00) Project:Prudhoe Bay I Site:PB F Pad Rig Name/No.:NORDIC 2 ;Spud Date/Time:9/19/1986 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292164900 Active datum:ORKB©66.71 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 19:50 0.83 WHSUR P POST PU INJECTOR&INSTALL NOZZLE.STAB ONTO WELL.CIRCULATE CORROSION INHIBITOR INTO REEL.2BPM/2300PSI. CIRCULATE NEET METHANOL INTO REEL. 19:50 - 21:00 1.17 WHSUR P POST BLOW DOWN REEL WITH NITROGEN,TAKE RETURNS TO TIGER TANK BLEED DOWN PRESSURE.POP OFF WELL. 21:00 - 21:30 0.50 WHSUR P POST GREASE TREE.INSTALL NITE CAP.OPEN WELL-VAC.RD NITE CAP. 21:30 - 21:35 0.08 WHSUR P POST PJSM FOR SETTING TWC W/T-BAR. 21:35 - 21:45 0.17 WHSUR P POST SET 4"'H'TWC.CLOSE MASTER&SWAB. 21:45 - 22:45 1.00 WHSUR P POST PU INJECTOR.BREAK OFF XO.CUT OFF CTC. PREP END OF COIL.INSTALL GRAPPLE CTC. INSTALL PULL BACK WINCH CABLE.PULL j TEST GRAPPLE-GOOD. 22:45 - 22:50 0.08 WHSUR P POST PJSM FOR PULLING BACK&SECURING COIL. 22:50 - 00:00 1.17 WHSUR P POST PULL COIL ACROSS&SECURE W/SHIPPING BAR&ED BAR.RD PULL BACK CABLE.RD GRAPPLE.REMOVE INJECTOR STUFFING BOX.REMOVE BRASS&PACKOFFS.SET INJECTOR DOWN ON RF.PLACE STUFFING BOX IN STAND&SECURE IT FOR MOVING RIG. 12/11/2014 00:00 - 00:45 0.75 WHSUR' P POST RU BORE SCOPE.ATTEMPT TO BORE SCOPE BOP'S.RD BORE SCOPE. 00:45 - 01:50 1.08 WHSUR P POST REMOVE INNER REEL IRON.SUCK DOWN PITS,CB,TT&PUMPS. 01:50 - 02:00 0.17 WHSURP POST LEAK TITE TEST FOR OPENING BOPE-PASS. BLEED OFF.RD TEST HOSE. 02:00 - 04:45 2.75 WHSUR P POST PU REEL&UNSECURE IT.OPEN BOMB BAY DOORS.DROP REEL.CLOSE DOORS. SIMILTANEOUSLY,OPEN ALL BOP DOORS. REMOVE SLIM HOLE RAMS&SWAP TO BIG HOLE RAMS.C/O BLIND RAM BLADE SEAL. BOTTON UP RAM DOORS.RD LUBRICATOR. RD INJECTOR GOOSE NECK. • 04:45 - 06:00 1.25 WHSUR P POST REPLACE ANNULAR ELEMENT. 06.00 - 10:30 4.50 BOPSUR P POST NIPPLE DOWN BOPE. NIPPLE UP TREE CAP. PRESSURE TEST TREE CAP TO 250/3500 PSI. RELEASE RIG AT 10:30 ON 12/11/2014 Printed 12/15/2014 3:16:07PM F-28C, Well History (Post-Rig Sidetrack) Date Summary 12/20/14 T/I/O=TWC/0/40. Removed BOP test spool (TS#1)and installed tree cap.Torqued entire tree and Ptd. Pulled 4" CIW H-TWC#291. 12/21/14 T/I/O=0/0/40 Removed second IA valve; Installed 2"VR plug in right side OA and removed OA valve. F W P=0/0/40. 01/03/15 TAG 3.70" DEPLOYMENT SLEEVE AT 8,230' SLM W/3.70"x 30'45KB DUMMY PATCH DRIFT(No issues). DRIFT TO DEVIATION AT 9,313'SLM W/1.75" CENTRALIZER (No issues). SET NORTHERN SOLUTIONS PTSA 3.00" QCLL SEAL ASSEMBLY W/2.313"X NIPPLE W/PX PLUG BODY INTO DEPLOY. SLV AT 8,230' SLM/8,253' MD. STUNG 45 KB PACKER W/QCLL CONNECTION INTO SEAL ASSEMBLY AT 8,227' SLM (DPU to stroke at 00:38). 01/04/15 T/I/O=25/0/0 Temp=SI, Assist Slickline***CMIT-TxIA***PASSED***to 2500 psi (Assist S/L) . Pumped 5 bbls crude to load tubing. Pumped 23 bbls crude down IA and tubing to reach 2522/2536 psi. OMIT- TxIA lost 13/7 psi in 1st 15 minutes and 10/4 psi in 2nd 15 minutes for a total loss of 23/11 psi in a 30 minute test. Bled IA and Tbg psi. SLB RIH and pulled prong then pumped 18 bbls crude down IA into TBG to establish a LLR of 2.45 gallons/min thru IA x TBG communication. (see log for details). Bled well pressure down, notify SLB&WSL, Hung tags and AFE sign, FWHP=803/685/0. 01/04/15 SET BAKER 45 KB/QCLL PACKER AT 8,218'SLM/8245' MD STUNG INTO INTO PTSA SEAL ASSEMBLY W/2.313"X-NIPPLE. SET P-PRONG INTO 2.313" PX PLUG BODY AT 8,232' SLM. LRS PERFORMED SUCCESSFUL OMIT-T x IA TO 2500 PSI. PULL P-PRONG &2.313" PX PLUG BODY FROM X-NIPPLE AT 8,232' SLM. LRS ACHIEVED A LLR OF 2.45 GPM AT 2500 PSI PUMPING DOWN IA. CURRENTLY PULLING OUT OF HOLE W/PDS 24 ARM CALIPER. 01/05/15 INITIAL T/I/O=400/320/50 PSI. SSV OPEN UPON ARRIVAL. RUN 1:RIH WITH SEALED TORPEDO/HEAD (3500-4200)/3 X 2-1/8"WEIGHT/GO ADAPTER/PDS NOISE TOOL. PERFORM BASELINE PASS AT 120 FPM TO LTP (8253'). POOH RIG DOWN PDS TOOLS. RU PATCH. RIH. SET PATCH FROM 7742'-7772' (ME-ME) CCL TO TOP ME= 9.8' CCL STOP =7732.2' OAL LEFT IN HOLE = 36.57'. TOP OF PATCH @ 7740.83'. BTTM OF PATCH @ 7776.56'. MIN I.D =2.45". DEPTH CORRECTED TO TUBING TALLY DATED 12-OCT-1986 POOH. RD SLB. HAND OVER WELL TO LRS FOR MIT. FINAL T/I/0= 1500/1000/50 PSI. 01/05/15 T/I/O=360/314/44, Temp=S/I,Assist E-line with LDL(LDL, Patch Set) Pumped 16.8 bbls crude down IA to assist E-line with LDL. Established an average LLR of 2.6 GPM @ 3000 psi. 01/05/15 Assist E-Line MIT-IA to 2500 psi FAIL(Post patch set) Pumped 2.1 bbls of ambient crude down IA to bring IA to test pressure for MIT-IA of 2552 psi. 15 mins Tbg gained 946 psi, IA lost 312 psi. 30 mins Tbg lost 12 psi, IA lost 42 psi. Total Test Tbg gained 934 psi, IA lost 364 psi. Bled back—5 bbls. FWHP's= 640/500/47 Valve positions: SV/WV=Closed, SSV/MV=Open, IA/OA= OTG. Page 1 of 1 z ' 40 bilD North America - ALASKA - BP Prudhoe Bay PB F Pad F-28 - Slot 28 500292164900 F-28C Design: F-28C Survey Report - Geographic 09 December, 2014 v' 1 BAKER HUGHES IM- O bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-28-Slot 28 Project: Prudhoe Bay TVD Reference: ORKB @ 66.71usft ' Site: PB F Pad MD Reference: ORKB @ 66.71usft Well: F-28 North Reference: True . Wellbore: F-28C Survey Calculation Method: Minimum Curvature • Design: F-28C Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB F Pad,TR-11-13 Site Position: Northing: 5,972,527.29 usft Latitude: 70°19'55.283 N From: Map Easting: 650,960.70 usft Longitude: 148°46'31.47 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.15° Well F-28 API No. 500292164900 Well Position +N/-S 0.00 usft Northing: 5,973,893.00 usft • Latitude: 70°20'8.377 N +E/-W 0.00 usft Easting: 652,650.00 usft , Longitude: 148°45'41.34 W Position Uncertainty 0.00 usft Wellhead Elevation: 37.86 usft Ground Level: 36.46 usft Wellbore F-28C API no. 500292164903 'Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°I (nT) BGG M2014 11/30/2014 19.52 81.02 57,597 Design F-28C Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,099.16 Vertical Section: Depth From(TVD) +N1-S +E/-W Direction (usft) (usft) (usft) (°) 31.21 0.00 0.00 59.57 Survey Program Date: 12/9/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 9,000.01 1 :Sperry-Sun BOSS gyro multi(F-28) BOSS-GYRO Sperry-Sun BOSS gyro multishot 9,069.01 9,099.16 MWD(F-28A) MWD MWD-Standard 9,120.00 12,171.87 MWD(F-28C) MWD MWD-Standard 12/9/2014 11:49:06AM Page 2 COMPASS 5000.1 Build 61 . ' ' rd- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-28-Slot 28 Project: Prudhoe Bay TVD Reference: ORKB @ 66.71usft Site: PB F Pad MD Reference: ORKB @ 66.71 usft Well: F-28 North Reference: True Wellbore: F-28C Survey Calculation Method: Minimum Curvature Design: F-28C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 31.21 0.00 0.00 31.21 0.00 0.00 5,973,893.00 652,650.00 70°20'8.377 N 148°45'41.34 W 100.00 1.02 97.31 100.00 -0.08 0.61 5,973,892.94 652,650.61 70°20'8.376 N 148°45'41.32 W 200.00 1.27 94.40 199.98 -0.28 2.60 5,973,892.78 652,652.60 70°20'8.374 N 148°45'41.26 W 300.00 1.02 106.81 299.96 -0.62 4.55 5,973,892.47 652,654.56 70°20'8.371 N 148°45'41.21 W 400.00 1.25 113.61 399.94 -1.31 6.40 5,973,891.82 652,656.43 70°20'8.364 N 148°45 41.15 W 500.00 0.87 133.00 499.92 -2.27 7.96 5,973,890.90 652,658.00 70°20'8.355 N 148°45'41.11 W 600.00 1.10 121.61 599.91 -3.29 9.33 5,973,889.90 652,659.39 70°20'8.345 N 148°45 41.07 W 700.00 0.88 133.00 699.89 -4.32 10.71 5,973,888.90 652,660.79 70°20'8.334 N 148°45'41.03 W 800.00 0.92 125.31 799.88 -5.30 11.93 5,973,887.94 652,662.03 70°20'8.325 N 148°45 40.99 W 900.00 0.75 119.31 899.87 -6.09 13.15 5,973,887.18 652,663.27 70°20'8.317 N 148°45'40.95 W 1,000.00 0.85 89.10 999.86 -6.40 14.46 5,973,886.90 652,664.59 70°20'8.314 N 148°45'40.92 W 1,100.00 0.78 86.80 1,099.85 -6.35 15.89 5,973,886.98 652,666.01 70°20'8.314 N 148°45'40.87 W 1,200.00 0.68 69.39 1,199.84 -6.10 17.12 5,973,887.25 652,667.24 70°20'8.317 N 148°45 40.84 W 1,300.00 0.47 39.00 1,299.83 -5.57 17.93 5,973,887.80 652,668.04 70°20'8.322 N 148°45 40.81 W 1,400.00 1.22 316.00 1,399.83 -4.49 17.45 5,973,888.87 652,667.54 70°20'8.333 N 148°45 40.83 W 1,500.00 2.23 327.31 1,499.78 -2.08 15.66 5,973,891.24 652,665.70 70°20'8.356 N 148°45'40.88 W 1,600.00 2.20 330.50 1,599.70 1.22 13.67 5,973,894.50 652,663.64 70°20'8.389 N 148°45'40.94 W 1,700.00 1.50 334.31 1,699.65 4.07 12.15 5,973,897.32 652,662.07 70°20'8.417 N 148°45'40.98 W 1,800.00 1.02 334.70 1,799.63 6.06 11.21 5,973,899.28 652,661.08 70°20'8.436 N 148°45 41.01 W 1,900.00 0.45 8.89 1,899.62 7.25 10.89 5,973,900.47 652,660.74 70°20'8.448 N 148°45 41.02 W 2,000.00 0.47 356.40 1,999.62 8.05 10.92 5,973,901.27 652,660.75 70°20'8.456 N 148°45'41.02 W 2,100.00 0.25 39.69 2,099.61 8.63 11.04 5,973,901.85 652,660.86 70°20'8.462 N 148°45 41.02 W 2,200.00 0.15 84.89 2,199.61 8.80 11.31 5,973,902.03 652,661.12 70°20'8.464 N 148°45 41.01 W 2,300.00 0.25 110.11 2,299.61 8.74 11.64 5,973,901.98 652,661.46 70°20'8.463 N 148°45'41.00 W 2,400.00 0.57 125.40 2,399.61 8.38 12.25 5,973,901.63 652,662.08 70°20'8.459 N 148°45'40.98 W 2,500.00 0.72 129.61 2,499.60 7.69 13.14 5,973,900.96 652,662.98 70°20'8.453 N 148°45'40.95 W 2,600.00 0.72 129.50 2,599.60 6.89 14.11 5,973,900.18 652,663.96 70°20'8.445 N 148°45 40.93 W 2,700.00 0.75 118.31 2,699.59 6.18 15.17 5,973,899.49 652,665.04 70°20'8.438 N 148°45 40.90 W 2,800.00 0.90 116.70 2,799.58 5.52 16.45 5,973,898.85 652,666.33 70°20'8.431 N 148°45'40.86 W 2,900.00 0.97 116.31 2,899.56 4.79 17.91 5,973,898.15 652,667.81 70°20'8.424 N 148°45 40.82 W 3,000.00 1.18 117.90 2,999.55 3.93 19.58 5,973,897.33 652,669.49 70°20'8.416 N 148°45'40.77 W 3,100.00 1.30 117.40 3,099.52 2.93 21.49 5,973,896.36 652,671.43 70°20'8.406 N 148°45'40.71 W 3,200.00 1.32 123.70 3,199.50 1.77 23.46 5,973,895.24 652,673.42 70°20'8.394 N 148°45 40.65 W 3,300.00 1.15 134.00 3,299.47 0.43 25.14 5,973,893.94 652,675.12 70°20'8.381 N 148°45'40.60 W 3,400.00 0.75 154.70 3,399.46 -0.86 26.14 5,973,892.67 652,676.15 70°20'8.368 N 148°45 40.57 W 3,500.00 0.78 161.81 3,499.45 -2.10 26.63 5,973,891.45 652,676.67 70°20'8.356 N 148°45 40.56 W 3,600.00 0.87 148.50 3,599.44 -3.39 27.24 5,973,890.16 652,677.30 70°20'8.344 N 148°45 40.54 W 3,700.00 0.67 163.40 3,699.43 -4.60 27.81 5,973,888.97 652,677.89 70°20'8.332 N 148°45 40.53 W 3,800.00 0.63 161.31 3,799.43 -5.68 28.15 5,973,887.90 652,678.26 70°20'8.321 N 148°45 40.52 W 3,900.00 0.62 179.40 3,899.42 -6.74 28.33 5,973,886.84 652,678.46 70°20'8.311 N 148°45'40.51 W 4,000.00 0.62 178.31 3,999.41 -7.82 28.35 5,973,885.76 652,678.50 700 20'8.300 N 148°45 40.51 W 4,100.00 0.55 187.30 4,099.41 -8.84 28.31 5,973,884.74 652,678.48 70°20'8.290 N 148°45'40.51 W 4,200.00 0.62 191.30 4,199.40 -9.85 28.14 5,973,883.73 652,678.33 70°20'8.280 N 148°45 40.52 W 4,300.00 0.55 190.80 4,299.40 -10.85 27.94 5,973,882.72 652,678.16 70°20'8.270 N 148°45'40.52 W 4,400.00 0.45 208.89 4,399.39 -11.66 27.67 5,973,881.90 652,677.89 70°20'8.262 N 148°45 40.53 W 4,500.00 0.45 210.10 4,499.39 -12.35 27.28 5,973,881.21 652,677.52 70°20'8.255 N 148°45'40.54 W 4,600.00 0.25 225.50 4,599.39 -12.84 26.93 5,973,880.71 652,677.18 70°20'8.251 N 148°45 40.55 W 4,700.00 0.12 248.69 4,699.39 -13.03 26.67 5,973,880.52 652,676.93 70°20'8.249 N 148°45'40.56 W 4,800.00 0.40 88.00 4,799.39 -13.06 26.92 5,973,880.49 652,677.18 70°20'8.248 N 148°45'40.55 W 4,900.00 0.22 97.90 4,899.39 -13.07 27.46 5,973,880.49 652,677.72 70°20'8.248 N 148°45 40.54 W 5,000.00 0.37 124.31 4,999.39 -13.28 27.92 5,973,880.29 652,678.18 70°20'8.246 N 148°45 40.52 W 5,100.00 0.57 251.89 5,099.38 -13.62 27.71 5,973,879.95 652,677.98 70°20'8.243 N 148°45 40.53 W 5,200.00 0.75 274.81 5,199.38 -13.72 26.59 5,973,879.83 652,676.86 70°20'8.242 N 148°45'40.56 W 5,300.00 1.35 315.11 5,299.36 -12.83 25.11 5,973,880.69 652,675.36 70°20'8.251 N 148°45'40.61 W 5,400.00 1.87 328.00 5,399.32 -10.61 23.41 5,973,882.87 652,673.62 70°20'8.273 N 148°45'40.65 W 12/9/2014 11:49:06AM Page 3 COMPASS 5000.1 Build 61 . •& 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-28-Slot 28 Project: Prudhoe Bay TVD Reference: ORKB @ 66.71usft Site: PB F Pad MD Reference: ORKB @ 66.71usft Well: F-28 North Reference: True Wellbore: F-28C Survey Calculation Method: Minimum Curvature Design: F-28C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +Nl-5 +EI-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 5,500.00 1.88 334.31 5,499.27 -7.75 21.83 5,973,885.70 652,671.98 70°20'8.301 N 148°45 40.70 W 5,600.00 2.08 339.00 5,599.21 -4.57 20.47 5,973,888.84 652,670.56 70°20'8.332 N 148°45'40.74 W 5,700.00 1.93 349.31 5,699.15 -1.23 19.51 5,973,892.17 652,669.53 70°20'8.365 N 148°45'40.77 W 5,800.00 1.60 347.90 5,799.10 1.79 18.90 5,973,895.18 652,668.86 70°20'8.395 N 148°45 40.79 W 5,900.00 1.10 344.90 5,899.07 4.09 18.36 5,973,897.46 652,668.27 70°20'8.417 N 148°45 40.80 W 6,000.00 0.62 340.50 5,999.06 5.52 17.93 5,973,898.89 652,667.81 70°20'8.431 N 148°45 40.81 W 6,100.00 0.75 332.90 6,099.05 6.62 17.45 5,973,899.97 652,667.31 70°20'8.442 N 148°45 40.83 W 6,200.00 0.62 338.61 6,199.05 7.70 16.96 5,973,901.05 652,666.80 70°20'8.453 N 148°45'40.84 W 6,300.00 0.45 332.31 6,299.04 8.55 16.58 5,973,901.89 652,666.40 70°20'8.461 N 148°45 40.85 W 6,400.00 0.50 333.20 6,399.04 9.29 16.20 5,973,902.62 652,666.00 70°20'8.468 N 148°45 40.87 W 6,500.00 2.02 34.39 6,499.01 11.13 17.00 5,973,904.48 652,666.77 70°20'8.486 N 148°45 40.84 W 6,600.00 6.15 45.00 6,598.74 16.38 21.78 5,973,909.82 652,671.44 70°20'8.538 N 148°45 40.70 W 6,700.00 11.12 45.00 6,697.58 26.99 32.40 5,973,920.64 652,681.84 70°20'8.642 N 148°45'40.39 W 6,800.00 13.47 44.00 6,795.27 42.19 47.31 5,973,936.14 652,696.43 70°20'8.792 N 148°45'39.96 W 6,900.00 14.62 45.80 6,892.28 59.37 64.45 5,973,953.66 652,713.22 70°20'8.961 N 148°45'39.46 W 7,000.00 15.77 46.19 6,988.79 77.57 83.30 5,973,972.25 652,731.70 70°20'9.140 N 148°45'38.91 W 7,100.00 17.02 47.50 7,084.72 96.87 103.90 5,973,991.96 652,751.90 70°20'9.330 N 148°45'38.30 W 7,200.00 18.72 48.80 7,179.89 117.33 126.76 5,974,012.88 652,774.34 70°20'9.531 N 148°45'37.64 W 7,300.00 19.85 50.10 7,274.28 138.79 151.86 5,974,034.84 652,799.00 70°20'9.742 N 148°45'36.90 W 7,400.00 20.93 52.60 7,368.01 160.53 179.08 5,974,057.13 652,825.76 70°20'9.956 N 148°45'36.11 W 7,500.00 22.13 54.00 7,461.04 182.45 208.51 5,974,079.64 652,854.74 70°20'10.171 N 148°45'35.25 W 7,600.00 23.17 54.19 7,553.32 205.03 239.70 5,974,102.86 652,885.46 70°20'10.393 N 148°45'34.34 W 7,700.00 24.05 54.19 7,644.95 228.47 272.18 5,974,126.94 652,917.45 70°20'10.624 N 148°45'33.39 W 7,800.00 24.47 54.10 7,736.12 252.53 305.48 5,974,151.68 652,950.26 70°20'10.860 N 148°45'32.42 W 7,900.00 24.77 54.10 7,827.03 276.96 339.23 5,974,176.79 652,983.50 70°20'11.101 N 148°45'31.43 W 8,000.00 24.47 54.19 7,917.94 301.36 372.99 5,974,201.87 653,016.75 70°20'11.341 N 148°45'30.45 W 8,100.00 24.57 55.00 8,008.92 325.41 406.82 5,974,226.60 653,050.08 70°20'11.577 N 148°45'29.46 W 8,200.00 24.93 55.00 8,099.73 349.42 441.11 5,974,251.30 653,083.88 70°20'11.813 N 148°45'28.46 W 8,300.00 24.97 55.39 8,190.40 373.50 475.75 5,974,276.08 653,118.01 70°20'12.050 N 148°45'27.44 W 8,400.00 24.63 56.50 8,281.18 396.99 510.50 5,974,300.27 653,152.28 70°20'12.281 N 148°45'26.43 W 8,500.00 24.43 57.10 8,372.15 419.72 545.24 5,974,323.70 653,186.54 70°20'12.505 N 148°45'25.41 W 8,600.00 23.63 59.60 8,463.49 441.10 579.89 5,974,345.77 653,220.75 70°20'12.715 N 148°45'24.40 W 8,700.00 23.77 59.80 8,555.05 461.37 614.59 5,974,366.75 653,255.03 70°20'12.914 N 148°45'23.39 W 8,800.00 23.80 59.00 8,646.56 481.90 649.31 5,974,387.99 653,289.31 70°20'13.116 N 148°45'22.37 W 8,900.00 24.10 58.80 8,737.95 502.87 684.06 5,974,409.66 653,323.64 70°20'13.322 N 148°45'21.36 W 9,000.00 24.07 58.80 8,829.24 524.01 718.97 5,974,431.50 653,358.10 70°20'13.530 N 148°45'20.34 W 9,069.01 24.01 58.72 8,892.27 538.59 743.01 5,974,446.56 653,381.84 70°20'13.674 N 148°45'19.64 W 9,099.16 27.33 67.90 8,919.45 544.39 754.67 5,974,452.59 653,393.38 70°20'13.731 N 148°45'19.30 W TIP 9,120.00 31.30 74.60 8,937.62 547.63 764.33 5,974,456.03 653,402.97 70°20'13.762 N 148°45 19.02 W KOP 9,154.21 36.43 61.54 8,966.06 554.84 781.86 5,974,463.60 653,420.35 70°20'13.833 N 148°45 18.50 W Interpolated Azimuth 9,185.15 41.42 52.23 8,990.14 565.50 798.05 5,974,474.59 653,436.32 70°20'13.938 N 148°45 18.03 W Interpolated Azimuth 9,215.15 46.55 44.95 9,011.73 579.31 813.61 5,974,488.70 653,451.59 70°20'14.074 N 148°45 17.58 W 9,244.91 52.46 39.68 9,031.06 596.05 828.80 5,974,505.76 653,466.43 70°20'14.239 N 148°45 17.13 W 9,275.41 60.66 36.87 9,047.85 616.03 844.52 5,974,526.05 653,481.75 70°20'14.435 N 148°45 16.67 W 9,305.37 70.02 36.02 9,060.34 637.91 860.67 5,974,548.25 653,497.45 70°20'14.650 N 148°45 16.20 W 9,335.36 78.85 35.82 9,068.38 661.29 877.60 5,974,571.96 653,513.90 70°20'14.880 N 148°45 15.71 W 9,365.11 89.42 36.71 9,071.42 685.11 895.08 5,974,596.14 653,530.89 70°20'15.114 N 148°45 15.20 W 9,395.55 94.12 35.75 9,070.48 709.65 913.06 5,974,621.03 653,548.36 70°20'15.356 N 148°45 14.67 W 9,425.20 96.96 34.74 9,067.61 733.75 930.09 5,974,645.47 653,564.90 70°20'15.593 N 148°45 14.17 W 9,455.20 96.77 31.09 9,064.03 758.75 946.27 5,974,670.79 653,580.56 70°20'15.839 N 148°45 13.70 W 9,485.41 96.86 28.83 9,060.44 784.73 961.25 5,974,697.08 653,595.01 70°20'16.094 N 148°45 13.26 W 12.9/2014 11:49:06AM Page 4 COMPASS 5000.1 Build 61 re 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-28-Slot 28 Project: Prudhoe Bay TVD Reference: ORKB @ 66.71 usft Site: PB F Pad MD Reference: ORKB @ 66.71usft Well: F-28 North Reference: True Wellbore: F-28C Survey Calculation Method: Minimum Curvature Design: F-28C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-S +E/-W Northing Easting (usft) (°) (0) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,515.34 96.31 27.44 9,057.01 810.95 975.27 5,974,723.58 653,608.49 70°20'16.352 N 148°45'12.85 W 9,545.17 94.30 26.63 9,054.25 837.41 988.77 5,974,750.30 653,621.45 70°20'16.612 N 148°45'12.46 W 9,575.18 92.67 26.09 9,052.43 864.25 1,002.07 5,974,777.40 653,634.20 70°20'16.876 N 148°45 12.07 W 9,605.24 91.01 25.46 9,051.46 891.30 1,015.14 5,974,804.71 653,646.71 70°20'17.142 N 148°45 11.69 W 9,635.35 90.74 24.48 9,051.00 918.59 1,027.84 5,974,832.26 653,658.86 70°20'17.410 N 148°45 11.32 W 9,665.35 90.58 22.63 9,050.66 946.09 1,039.83 5,974,859.99 653,670.28 70°20'17.681 N 148°45'10.97 W 9,695.23 90.49 19.65 9,050.38 973.96 1,050.61 5,974,888.07 653,680.49 70°20'17.955 N 148°45'10.65 W 9,725.06 90.49 16.95 9,050.12 1,002.27 1,059.97 5,974,916.57 653,689.27 70°20'18.233 N 148°45'10.38 W 9,755.16 90.58 16.00 9,049.84 1,031.14 1,068.51 5,974,945.59 653,697.22 70°20'18.517 N 148°45'10.13 W 9,792.46 90.15 16.57 9,049.60 1,066.94 1,078.97 5,974,981.60 653,706.95 70°20'18.869 N 148°45'9.82 W 9,815.25 89.23 20.49 9,049.73 1,088.54 1,086.21 5,975,003.34 653,713.75 70°20'19.082 N 148°45'9.61 W 9,845.49 88.74 22.54 9,050.26 1,116.67 1,097.30 5,975,031.69 653,724.26 70°20'19.358 N 148°45'9.29 W 9,875.05 90.31 26.03 9,050.51 1,143.61 1,109.45 5,975,058.87 653,735.86 70°20'19.623 N 148°45 8.93 W 9,905.06 90.55 29.22 9,050.28 1,170.19 1,123.36 5,975,085.73 653,749.23 70°20'19.885 N 148°45'8.53 W 9,935.53 90.86 31.58 9,049.91 1,196.47 1,138.78 5,975,112.31 653,764.11 70°20'20.143 N 148°45 8.08 W 9,965.21 89.54 32.43 9,049.80 1,221.64 1,154.51 5,975,137.79 653,779.32 70°20'20.391 N 148°45'7.62 W 9,995.39 88.47 34.49 9,050.33 1,246.81 1,171.15 5,975,163.30 653,795.44 70°20'20.638 N 148°45'7.13 W 10,025.37 88.90 37.99 9,051.02 1,270.98 1,188.86 5,975,187.82 653,812.66 70°20'20.876 N 148°45'6.61 W 10,055.08 88.10 41.23 9,051.79 1,293.86 1,207.79 5,975,211.08 653,831.12 70°20'21.101 N 148°45'6.06 W 10,085.16 89.66 44.54 9,052.38 1,315.89 1,228.26 5,975,233.52 653,851.13 70°20'21.318 N 148°45'5.46 W 10,115.83 88.71 49.41 9,052.82 1,336.81 1,250.67 5,975,254.89 653,873.11 70°20'21.523 N 148°45'4.81 W 10,145.35 88.07 52.45 9,053.65 1,355.40 1,273.58 5,975,273.94 653,895.63 70°20'21.706 N 148°45'4.14 W 10,174.87 88.10 54.90 9,054.63 1,372.88 1,297.34 5,975,291.90 653,919.04 70°20'21.876 N 148°45'3.44 W 10,208.36 86.13 56.55 9,056.32 1,391.71 1,324.98 5,975,311.29 653,946.28 70°20'22.063 N 148°45'2.64 W 10,235.57 86.07 59.67 9,056.17 1,406.05 1,348.03 5,975,326.10 653,969.03 70°20'22.204 N 148°45'1.96 W 10,265.69 84.99 61.46 9,060.52 1,420.81 1,374.18 5,975,341.38 653,994.87 70°20'22.349 N 148°45'1.20 W 10,295.11 86.10 66.00 9,062.81 1,433.79 1,400.47 5,975,354.89 654,020.90 70°20'22.477 N 148°45'0.43 W 10,325.61 89.82 66.64 9,063.89 1,446.03 1,428.38 5,975,367.69 654,048.55 70°20'22.597 N 148°44'59.62 W 10,355.37 91.54 65.09 9,063.54 1,458.19 1,455.54 5,975,380.41 654,075.45 70°20'22.717 N 148°44'58.82 W 10,385.13 92.89 62.73 9,062.39 1,471.27 1,482.24 5,975,394.03 654,101.88 70°20'22.845 N 148°44'58.04 W 10,416.09 97.11 64.87 9,059.69 1,484.89 1,509.91 5,975,408.20 654,129.26 70°20'22.979 N 148°44'57.23 W 10,444.87 94.49 62.69 9,056.78 1,497.54 1,535.59 5,975,421.37 654,154.68 70°20'23.103 N 148°44'56.48 W 10,475.31 92.15 64.24 9,055.02 1,511.11 1,562.77 5,975,435.49 654,181.58 70°20'23.237 N 148°44'55.69 W 10,505.69 89.75 65.72 9,054.51 1,523.96 1,590.30 5,975,448.90 654,208.83 70°20'23.363 N 148°44'54.89 W 10,535.31 87.08 66.28 9,055.33 1,536.00 1,617.34 5,975,461.48 654,235.63 70°20'23.482 N 148°44'54.10 W 10,565.23 89.45 70.35 9,056.24 1,547.04 1,645.13 5,975,473.09 654,263.18 70°20'23.590 N 148°44'53.28 W 10,595.42 89.11 73.39 9,056.62 1,556.44 1,673.81 5,975,483.07 654,291.66 70°20'23.682 N 148°44'52.45 W 10,625.47 88.96 76.60 9,057.13 1,564.21 1,702.83 5,975,491.43 654,320.51 70°20'23.759 N 148°44'51.60 W 10,655.35 90.09 79.85 9,057.37 1,570.31 1,732.07 5,975,498.12 654,349.63 70°20'23.819 N 148°44'50.74 W 10,685.36 91.23 83.60 9,057.03 1,574.63 1,761.76 5,975,503.05 654,379.22 70°20'23.861 N 148°44'49.88 W 10,715.57 89.48 84.55 9,056.84 1,577.75 1,791.81 5,975,506.77 654,409.19 70°20'23.892 N 148°44'49.00 W 10,745.47 91.13 87.99 9,056.68 1,579.69 1,821.64 5,975,509.33 654,438.98 70°20'23.911 N 148°44'48.13 W 10,775.36 91.07 90.57 9,056.11 1,580.07 1,851.52 5,975,510.31 654,468.84 70°20'23.914 N 148°44'47.26 W 10,805.64 91.23 93.81 9,055.50 1,578.91 1,881.77 5,975,509.77 654,499.10 70°20'23.903 N 148°44'46.37 W 10,835.44 89.29 91.15 9,055.36 1,577.62 1,911.54 5,975,509.09 654,528.89 70°20'23.890 N 148°44'45.50 W 10,865.51 91.50 89.06 9,055.16 1,577.57 1,941.60 5,975,509.64 654,558.95 70°20'23.890 N 148°44'44.62 W 10,895.66 89.48 85.57 9,054.90 1,578.98 1,971.71 5,975,511.67 654,589.02 70°20'23.903 N 148°44'43.74 W 10,925.47 90.46 81.83 9,054.91 1,582.25 2,001.34 5,975,515.54 654,618.57 70°20'23.936 N 148°44'42.88 W 10,955.44 90.92 77.85 9,054.55 1,587.53 2,030.83 5,975,521.42 654,647.95 70°20'23.987 N 148°44'42.02 W 10,985.41 92.12 75.13 9,053.76 1,594.53 2,059.95 5,975,529.01 654,676.92 70°20'24.056 N 148°44'41.17 W 11,016.71 91.54 72.42 9,052.76 1,603.27 2,089.99 5,975,538.36 654,706.77 70°20'24.142 N 148°44'40.29 W 11,045.99 90.92 71.84 9,052.13 1,612.25 2,117.85 5,975,547.91 654,734.44 70°20'24.230 N 148°44'39.48 W 11,075.33 88.50 69.45 9,052.28 1,621.98 2,145.53 5,975,558.19 654,761.91 70°20'24.326 N 148°44'38.67 W 11,105.36 88.71 67.52 9,053.01 1,632.99 2,173.46 5,975,569.77 654,789.61 70°20'24.434 N 148°44'37.85 W 11,135.20 89.60 65.38 9,053.45 1,644.91 2,200.81 5,975,582.24 654,816.71 70°20'24.551 N 148°44'37.05 W 12/9/2014 11:49:O6AM Page 5 COMPASS 5000.1 Build 61 is F/'_ • bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-28-Slot 28 Project: Prudhoe Bay TVD Reference: ORKB @ 66.71 usft Site: PB F Pad MD Reference: ORKB @ 66.71 usft Well: F-28 North Reference: True Wellbore: F-28C Survey Calculation Method: Minimum Curvature Design: F-28C Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 11,165.28 88.83 63.81 9,053.86 1,657.81 2,227.97 5,975,595.69 654,843.61 70°20'24.678 N 148°44'36.26 W 11,195.34 88.10 61.90 9,054.67 1,671.52 2,254.71 5,975,609.94 654,870.06 70°20'24.813 N 148°44'35.48 W 11,225.31 88.59 60.45 9,055.53 1,685.96 2,280.96 5,975,624.91 654,896.00 70°20'24.955 N 148°44'34.71 W 11,253.76 90.95 63.18 9,055.65 1,699.40 2,306.03 5,975,638.86 654,920.79 70°20'25.087 N 148°44'33.98 W 11,285.22 92.06 66.74 9,054.82 1,712.71 2,334.52 5,975,652.74 654,949.00 70°20'25.218 N 148°44'33.15 W 11,315.35 91.97 69.94 9,053.76 1,723.82 2,362.50 5,975,664.42 654,976.75 70°20'25.327 N 148°44'32.33 W 11,346.25 89.82 73.10 9,053.28 1,733.61 2,391.80 5,975,674.81 655,005.84 70°20'25.423 N 148°44'31.47 W 11,374.96 87.76 75.06 9,053.88 1,741.48 2,419.40 5,975,683.24 655,033.27 70°20'25.500 N 148°44'30.67 W 11,405.52 88.19 77.92 9,054.96 1,748.62 2,449.09 5,975,690.97 655,062.81 70°20'25.570 N 148°44'29.80 W 11,435.42 91.26 81.07 9,055.11 1,754.07 2,478.48 5,975,697.02 655,092.08 70°20'25.624 N 148°44'28.94 W 11,465.56 90.61 85.01 9,054.62 1,757.72 2,508.39 5,975,701.28 655,121.91 70°20'25.660 N 148°44'28.07 W 11,495.36 88.59 88.03 9,054.82 1,759.53 2,538.13 5,975,703.69 655,151.60 70°20'25.677 N 148°44'27.20 W 11,525.29 90.61 89.54 9,055.03 1,760.16 2,568.05 5,975,704.94 655,181.50 70°20'25.684 N 148°44'26.32 W 11,555.32 91.63 88.93 9,054.45 1,760.56 2,598.07 5,975,705.95 655,211.50 70°20'25.687 N 148°44'25.45 W 11,585.39 92.58 89.75 9,053.34 1,760.91 2,628.12 5,975,706.91 655,241.54 70°20'25.691 N 148°44'24.57 W 11,615.39 93.99 92.98 9,051.62 1,760.20 2,658.05 5,975,706.80 655,271.48 70°20'25.684 N 148°44'23.70 W 11,645.43 94.79 91.11 9,049.32 1,759.13 2,687.98 5,975,706.34 655,301.42 70°20'25.673 N 148°44'22.82 W 11,675.52 92.83 90.76 9,047.32 1,758.64 2,718.00 5,975,706.46 655,331.44 70°20'25.668 N 148°44'21.94 W 11,705.42 90.37 90.73 9,046.49 1,758.25 2,747.89 5,975,706.68 655,361.33 70°20'25.664 N 148°44'21.07 W 11,735.52 89.45 89.48 9,046.54 1,758.19 2,777.98 5,975,707.24 655,391.42 70°20'25.663 N 148°44'20.19 W 11,765.46 88.71 86.88 9,047.02 1,759.14 2,807.90 5,975,708.80 655,421.31 70°20'25.673 N 148°44'19.32 W' 11,795.45 91.84 85.75 9,046.87 1,761.07 2,837.83 5,975,711.34 655,451.19 70°20'25.692 N 148°44'18.44 W 11,825.48 90.67 83.65 9,046.21 1,763.84 2,867.72 5,975,714.72 655,481.01 70°20'25.719 N 148°44'17.57 W 11,855.54 89.85 81.74 9,046.08 1,767.67 2,897.53 5,975,719.14 655,510.74 70°20'25.756 N 148°44'16.70 W 11,885.58 89.63 79.22 9,046.21 1,772.63 2,927.16 5,975,724.71 655,540.25 70°20'25.805 N 148°44'15.83 W 11,915.35 89.91 77.04 9,046.33 1,778.76 2,956.29 5,975,731.43 655,569.25 70°20'25.865 N 148°44'14.98 W 1 11,945.60 90.09 74.60 9,046.33 1,786.17 2,985.61 5,975,739.43 655,598.42 70°20'25.938 N 148°44'14.13 W 11,975.49 89.75 72.55 9,046.38 1,794.62 3,014.28 5,975,748.46 655,626.91 70°20'26.021 N 148°44'13.29 W 12,005.43 90.21 70.52 9,046.39 1,804.10 3,042.68 5,975,758.52 655,655.10 70°20'26.114 N 148°44'12.46 W 12,035.32 90.55 68.57 9,046.19 1,814.54 3,070.68 5,975,769.53 655,682.89 70°20'26.217 N 148°44'11.64 W 12,065.37 91.01 65.85 9,045.78 1,826.18 3,098.38 5,975,781.73 655,710.34 70°20'26.331 N 148°44'10.83 W 12,106.07 89.82 62.65 9,045.48 1,843.86 3,135.03 5,975,800.15 655,746.62 70°20'26.505 N 148°44'9.76 W 12,125.73 90.28 62.24 9,045.47 1,852.96 3,152.46 5,975,809.60 655,763.86 70°20'26.594 N 148°44'9.25 W 12,155.42 89.20 61.02 9,045.60 1,867.06 3,178.59 5,975,824.23 655,789.69 70°20'26.733 N 148°44'8.49 W 12,171.87 88.00 59.16 9,046.00 1,875.26 3,192.84 5,975,832.72 655,803.78 70°20'26.813 N 148°44'8.07 W 12,201.00 88.00 59.16 9,047.02 ' 1,890.19 3,217.84 5,975,848.15 655,828.46 70°20'26.960 N 148°44'7.34 W Projection to TD 12/9/2014 11:49:06AM Page 6 COMPASS 5000.1 Build 61 • • o N O O L N m 0 N a) C O N ll J Ctu N °.� v 0 D E 2 E N W W O O H m OL W 0 o U E a 2 0 Q c ooco H Z H c m oW n uQ W W O wO U N CO0 W U U 0 o g y U) ooU o a,Y < co 0, JbJ J .NN O n0( o0ooo <Nn o w n 111.)W • C!..° O a LL O N 0 0 0 0 0 O 0 0 LO 0 0 C) Ea o N LO O LO O O ON 0 0 0 UOf0 C y WW O X N^ m 'O N m ,az., o E L 2 2 cio LO O1 N DO co > N -' W E a) co . O 2 w 1 I= n C C U EN 'N _ N ` O 0 W o O1E m U cd J Nc } T 55 m o C Z oa 3 W oQ H E — o N n LL Cl .CO �' - Cl X U) r m .. To 2 Y c U) CC ID ry E rn -0 mti cr- N C1 J o _o o N N °_. N o a n 0 UCO E o 0 U) o v Y d Q 0 0 07 H 0 v • N - LO W .0 NO r .0 OO1 ,E c N QN m d a,N E U " COCL d a rt a >d o Y as E O Q' 40) ^ ' C J c0 i c _o CO c L to O .0 CD U) �^Q/' I W Q c p a iii Ln > E ED a -;--• c LL/ _... A N y 3 N U U N O N E Q m E o p o x x > a) a U I= " COC1 CO > 0 0 W W U) 0_ > Fw U) N = N p N 'p '0 U = m m v 'a '3 0 4) 0) r w a m J Q LL o E = ,3 y 6 6. O. LL E "' vi ,� o o N N co < d n C9 t., g .5 < -0 o a 0 0 x Z v CC m "C4/1 o U m V) o ^ -En N Z d' N U) OL a - O. O O .0 a n E.,: N n Ll N Z O N 0 N v R v O . N- m co E V E ar o J 0 co v 0_ 0 m N m U Z > 0 Cl) N YO p) U U) U) LY Q O • N C N O 47 N p E N n ce E C C HT H "3 co fes. N .- O W o 0 2 5 H 0 0 QO U) 0 0 H o N0 LL W 0 m W LY m a.-. 17 a Q E LL u> > Lu a) _ Q 0 LL 0 0 c o cc 2 W o a' Z H N o0 0 W J Z Y N 0 co U Z W U r- cc O 2 2e y m Z m H W y n ci, 0 Mo w Q J 0 0 a w .s o O LL 2 0 m 0 U 0 LL' Z U w " 00) U 0 N = u) d a r H U d t` Y o U) ti U Q Z c m Z E _ o >� Z U m W fn W Z U E L 0) N E m U 0 0 E r a) W H d N Z o 0 cY a E m E 0 t O Q ._ ) H d '6 U Z N E N N an iU h- 2 a� .. N p N E E c m o E U a) 0) C d a O O U N j H l0 E n gi J N (n LI') N 0 U H N LOO n c c O O m H iU D > T o CD Y v ,C N C z. N N p_ Z N N H r co O M N U o ° > o .co E E a 'v Z Q a d v w vco o m L a 0 0_ W 0 7 ' 0 CJ Cr- Lr LY IL u) 0_ Y u) O 2 0 p� p o H • • 4 O is N U_ O m n N- O 3 N N O = N N W CLL Q L - o ) < in to d w o V O o m J n E N- N H j - S . CO M 0 N O (L) U U oo E co cc n - Z Z n 0CD a) _ a) N- -w m g r. CO d L n S' a` — >. - Fn o 0O ',CO o (a 12 F- o) m O w in C o) )) H ) rn coE n _ iii u_ o o z m m W ~ o aO1) O jz U O d Z d F- o• m a y a 0) d ▪ O Z Lo 6 co c_ d 3 W O id J a) co. LL c+) co cr u) Q X CO 0 0 0 0 a o a O v a = .E rn_E o CC = Z Z C E 7 O n a) V N d d L E (\ m a E m V n n N o m >- -O O Z N N , = d N C a oCO 2 N o o r .a) m �y d y N y j a v .. �' .E cc a) J m O a) .. -o o N. 12 E O. c o m E N ( B 9 C./) CD w a ',c m = r a ao .. A d o c)- < Q c a 1a F a J 2 y a E Y L to > y 3 Q C Q m ° co - 2 O w>- > a ti -o o -Fe, _ oo m m y a) .N 1-6 °� c c w E _ U = m (A o m n U ~ _, a z i= U o E u o) U E o a E x o 1- (15- C U al .O-. E E m a p in m 'ce a aai o L d N 6 •(0 a) O O O J a) O V O co n m 0 S F- -) w cc S O 0 L) H a >- Z C) v ap a) o NZ o o' mON N ` •an — O N Z E o_ a) O_ o) U- a) a) 16 7 d vJ at n c d O -6 g O d Z ?. L. Z o- 0. O at ',. 41.) IN m U U _ 6 o N L (/) a m E co a,2 j co O M C (n J O N E o n C '-°. a) ttg O N w •E - N O a m N N OX d' L _O .. C g 3 � 2 F- o no v, W H O S W o O C n m o °? E 2. . 0 0 ¢ o a z w a v o an a) aai _ ao c 2 E a g N Z---- > a' J m_ O 0 Z a Z Z 0 a W C0 al TO w F O m U3H O z rn IE n E o c N S J a) LU } E L f/) w Qo cC u) ili >, z 0 O W N ? 0 a) J N rn O o m m N 0 Z L O Q (o Q▪ n a) a s Z N '5 J5 Tt a O Q_ d •••O N Fc LL Li = �' m 2' a C >. 0 6. N- c W N a) a) Z rN, E IS ~ z C J d Q = Q (n O C 4 .O > at o LU d a) d' N arY mi D. d d 0 a w U n u) c w - E 0 co c o w o N h U FT i= c.) U D as U m H 2 252\3 Letter of Transmittal BAKER Date: DATA LOGGED December 22, 2014 /S/2015 HUGHES M.K.BENDER To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Jesse Salyer Jesse.Salyer@bakerhughes.com Please find enclosed the final log data for the following well(s): F-28C Enclosed for each well(s): 2 hardcopy prints of final log data reports 1 compact disk containing electronic log data files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: , State of Alaska AOGCC DATE: RECEIVED DEC 2 3 2014 AOGCC oj.xu�'a , O- 4 7 ./.. 01F. Titzt,,.....'''.,,\.\\ , , _, =1'tom, _::--2- ='-'1 J _—__!,/-' .1_,--J j \L,11\_ . ,- 1 0s1. — 333 Wei S ' en h A en e �"�' f GOVERNOR SEAN P'ARN'lil.l Ancl��oiage Alaska 99501-3572 Maui aui 907 279 433 1nJ -0114111U-0114111U John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU F-28C BP Exploration (Alaska), Inc. Permit No: 214-172 Surface Location: 2359' FSL, 2193' FEL, SEC. 02, Ti 1N, R13E, UM Bottomhole Location: 4156' FSL, 807' FWL, SEC. 01, Ti 1N, R13E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, &)/.17 ,9x_,,,./Ld1/4„ Cathy P. Foerster Chair DATED this 2v day of October, 2014. FIECEJVED STATE OF ALASKA ` ALA IL AND GAS CONSERVATION COMP, 1N OCT 2 2 2014 PERMIT TO DRILL 20 AAC 25.005 AOGCC la Type of work: 1b.Proposed Well Class: ®Development Oil• 0 Service-Win' ®Single Zone • 1c.Specify if well is proposed for: 0 Drill 0 Lateral 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 Coalbed Gas 0 Gas Hydrates . ®Redrill 0 Reentry 0 Exploratory 0 Service-WAG 0 Service-Disp 0 Geothermal 0 Shale Gas 2.Operator Name: 5.Bond IN Blanket 0 Single Well 11.Well Name and Number BP Exploration(Alaska) Inc. Bond No 6194193 . PBU F-28C • 3. Address 6.Proposed Depth: 12.Field I Pool(s) P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 12000' • TVD 8979'ss • Prudhoe Bay/Prudhoe Bay 4a.Location of Well(Governmental Section): 7.Property Designation(Lease Number): Surface: ADL 028280 • 2359'FSL,2193'FEL, Sec. 02,T11N, R13E, UM Top of Productive Horizon: 8.Land Use Permit: 13.Approximate Spud Date: 2896'FSL, 1293'FEL, Sec. 02,T11N, R13E, UM November 15,2014 Total Depth 9.Acres in Property: 14.Distance to Nearest Property. 4156'FSL, 807'FWL, Sec.01,T11N, R13E, UM 2560 6580' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10 KB Elevation above MSL: 66.71' feet 15.Distance to Nearest Well Open Surface: x 652650 • y-5973893 • Zone- ASP4 ' GL Elevation above MSL: 36.46' . feet to Same Pool: 200' 16.Deviated Wells: Kickoff Depth: 9120' • feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 99 degrees Downhole: 3272- Surface: 2392 18 Casing Program Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing _ Weight _ Grade Coupling Length MD TVD MD ND (including stage data) 3-1/4" 2-3/8" 4.7# L-80 TH 511 3685' 8315' 8137'ss 12000' 8979'ss 84 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth ND(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured) 11130' 9055' 8209' 11130' 9055' None Casing Length Size Cement Volume MD ND Conductor/Structural 80' 20" 8 cu yds Concrete 32'- 112' 32'- 112' Surface 2644' 13-3/8" 3274 cu ft Arcticset III,465 cu ft Arcticset III 31'-2675' 31'-2675' Intermediate 8565' 9-5/8" 575 cu ft Class'G' 28'-8593' 28'-8457' Production _ Liner 752' 7" _374 cu ft Class'G' 8321'-9073' 8209'-8896' Liner 1311' 3-1/2"x 3-3/16"x 2-7/8" 146 cu ft Class'G' 8349'-9660' 8235'-9058' Slotted Liner 1540' 2-3/8" Uncemented Slotted Liner 9590'- 11130' 9055'-9055' Perforation Depth MD(ft)• Slotted Liner:9597'- 11130' Perforation Depth ND(ft): Slotted Liner: 9055'-9055' 20.Attachments: 0 Property Plat 0 BOP Sketch 0 Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis 0 Diverter Sketch 0 Seabed Report ®Drilling Fluid Program 0 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date 22. I hereby certify that the foregoing is true and correct: Contact J. Kyle Raese,564-4629 Printed Na--111--sr- e Joha.McMullen Title Engineering Team Leader Email John.Raese@bp.com% Signature ! �'-c7���,4...� v Phone 564-4711 Date \() -�`- 2b&4.. ‘,s- N'\,Kwtk1. Commission Use Only Permit To Drill / API Number: Permit Approval Clap.) See covergletter for Number: Zl7 �71. 50-029-21649-03-00 !CAA other requirements: Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas Elf J contained shales. / Other: BOP f fo 3 S G 0 5 i Samples Req'd Dyes L�No Mud Log Req'd: ❑XesI No ff vl VI v/a. r /—e-5 f fd Z,,j 00(P 5 I HZS Measures: g Yes ❑ o Directional Survey Req'd. &I Yes ❑No Spacing exception req'd: 0 Yes L"No inclination-only svy Req'd. 0 Yes L /No APPROVED BY APPROVED BY - ' f3 ^ p BittpctsOMMISSIONER THE COMMSSION Date/CJ-ze- Form 10-401 Revised 10/2w12 Thii pew[ from the date of approval(20 AAC 25.005(g)) Submit Form and Attachments In Duplicate Uv /n/24//4VR - /0-y7/.i4,! To: Alaska Oil &Gas Conservation Commission From: J. Kyle Raese CTD Engineer bp Date: October 21, 2014 Re: F-28C Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack lateral from well F-28B by the Nordic 2 Coiled Tubing Drilling rig on or around November 15, 2014. The F-28C sidetrack will exit through the existing 3-3/16" liner and kick off in Zone 2B and target Zone 1B reserves. The proposed sidetrack is a —2,880' horizontal Ivishak Zone 1B producer which will access a —25 acre reserves target northeast of F-28B on F-pad. The lateral will be completed with a 2-3/8" L-80 liner which will be cemented and perforated. Rig Work(scheduled to begin November 15,2014) A `SVS r 1. MIRU and test BOPE 250 psi low and 3,500 psi high. (MASP 2,392 psi) 2. Pull TWC and bullhead kill well (only if MIT-T fails) 3. Mill 2.74"window and 10' of rathole. 4. Drill build: 3.25" OH, 250' (28 deg DLS planned). 5. Drill lateral: 3.25" OH, 2610' (12 deg DLS planned). 6. Run 2-3/8" L-80 liner leaving TOL at—8315' MD. 7. Pump primary cement job: 17.4 bbls, 15.8 ppg, TOC at—9100' MD.* 8. Perform liner cleanout and RPM/GR/CCL log. 9. Perform liner lap test. 10. Perforate liner based on log interpretation (-600 - 1000'). 174 r5 11. Freeze protect well to 2,500'TVDss. PTD 12. Set TWC; RDMO. Post-Rig Work 1. V Pull TWC. 2. S Set 45 KB liner top packer.*Set generic GLVs. 3. T Test separator. *Approved alternate plug placement per 20 AAC 25.112(i) Mud Program: • Well kill: 8.4 ppg brine (572 psi over-balance) • Milling/drilling: 9.5 ppg PowerPro for milling window and drilling (1075 psi over-balance). Disposal: • All Class I & II non-hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or • Pad 3 at DS 6. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >11 must9 o to GNI. Hole Size: • 3.25"from 9,120' MD to 12,000' MD Liner Program: • 2-3/8", 4.7 lb/ft, L-80, TH 511 liner with cementralizers 8,315' MD - 12,000' MD • A minimum of 17.4 bbls of 15.8 ppg cement will be used for liner cementing (TOC 9,100' MD). • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional: • See attached directional plan. Maximum planned hole angle is 99°, inclination at kick off point is 31°. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property—6580'. • Distance to nearest well within pool—200'. Logging: • MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section. • Cased hole GR/CCL/RPM logs will be run. Perforating: • 1.56" 1606 PJ HMX, 6 spf perf guns, 1" CSH work string &2-1/16" CSH. • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti-Collision Failures: • F-11 Center to center: 341' —Abandoned • F-11 A Center to center: 379' —Abandoned • F-11 B Center to center: 450' — Producer to be shut-in • F-28 Center to center: 1' — Parent wellbore • F-28A Center to center: 0' — Parent wellbore at KOP • F-28B Center to center: 0'— Parent wellbore at KOP Hazards: • F Pad is considered an H2S pad. • F-28B had 9 ppm H2S on 2/28/2011. • The lost circulation risk for F-28C is considered to be low with two planned fault crossings. Reservoir Pressure: • The reservoir pressure on F-28C is expected to be 3,272 psi at 8,800' TVDss (7.15 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,392 psi. - • An EMW of 8.4 ppg for this well will provide 572 psi over-balance to the reservoir. J. Kyle Raese CC: Well File CTD Engineer Joseph Lastufka LICO I HEAD= CAN Mc F-2 8 B OMP..... WRAP REPAIR SH LEAK-DO NOT MIT-OA `ACTUATOR= BAKER C OVER 1200 PSI WE TO DESIGNED PRESSURE RATING OKB.ELEV= 66.7' I I OF REPAIR AND DO NOT PUMP METH OR METH BE.RE = 38' BLED INTO OA DU=TO CHENI INCOMPATIBILITY KOP= 6700' W/BPDXY RESIN IN WRAP" Max Angle= 97"@ 10082' Datum MD 9041' ( 0 2085' —I OTIS DBE SSSV NP,D=3.813" Qatum TVD= 8800'SS 13-3/8"CSG,68#,L-80 BTRS,D=12415'l 2675' 1---• 'ILGAS UFT MANDRELS ST MD TVD DEV TYPE VLV LATCH SIZE DATE L "72978 2978 1 OTIS DMY RM 0 11/15/13 r6 '4774 r4774" 0 OT1S DMI' RM ' 0 11/15/13 Minimum ID = 1.995" © 9597' I r5 5904"5903 r 1 OTIS DMY RA ' 0 10/12/86 TOP OF 2-3/8" SLOTTED LINER r4 '6640 6638 r 8 OTIS [MY RA r 0 10/12/86 r 3 `7180`7161 ' 18 OTIS DMY RA ' 0 10/12/86 2 7758 7698 24 OTIS EMPTY RM 10/03/14 1 8140 8045 25 OT1S EQ DMY RA 0 10/12/86 8209' H4-112"OTIS XA SLD SLV,D= 3.813" 8209' —4-1/2"PX PLUG(09/29/14) 8268' —ITM/TBG SEAL ASSY 8283' 1-19-5/8"X 4-1/2- TRA/NNW PKR D=4.750" 8288' H KILL OUT EXTENSION,D=6.004" TOP OF 7'LNR -f 8321' 8321'H7"BROWN SHORTY H1'D.LM I-JGR III ,---1 8325' H 4-1/2"OTiS X NP,D=3.813" 8349' —1 3.70"BKR DEPLOYMENT SLV,D=3.00" immilviT-1- 8357' —i4-1/2"OTIS XN NIP,MLL®TO 3.80"(BEHIND LNR) I , 8369' —I3-1/2"HES X NP,ID=2.813" 4-1/2"TBG-PC,12.64,L-80 BUTT,' -r 8391' .0152 bpf,D=3.958 H I W 8391' H4-1/2" LEG(BEHIND CT LM 3-1/2"LNR 8.81#,L-80 STL,.0087 bpf,ID=2.992" 8401' I"�� i 8401' 7-13-1/2"X 3-3/16"XO,D=2.786" 9-5/8"CSG,47#,L-80 NSCC/BTRS,D=8.681" — 8593' Ilk8845' 4 ESTIMATED CEMENT TOP •• ••4 7"IVILLOUT WINDOW(F-28A) 9073' • 7"LW,26#,L-80 TC45,.0383 bpf,D=6.276" I—I —9073 .-------. 9209' 7"MARKER JOINT TOP OF 2-3/8"LNR H I 9590' 9590' H 2.70"BTT DEPLOYMENT SLV,10=2.250" 3-3/16"BKR FKR WI-*'STOCK(01/04/11) — 9660' —Thi 3-3/16"LW,6.2#,L-80,.0076 bpf,1D=2.80" --1 9678' I I 3-3/16"MLLOUT WIDOW(F-28B) 9660'-9665' PERFORATION SUMMARY \ REF LOG ANGLE AT TOP FERE: WA Note:Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 2-318" SLOT 9597-11130 SLID 01!14!11 ` 2-3/8"SLTD LNR,4 40#,L-80 STL, .0039 bpf,ID< 1 095" H 11130' DATE REV BY COMMENTS I DATE REV BY COMMENTS FRIDHOEBAY UNIT 10/12/86 NI 8E ORIGINAL COMPLETION 10/02/14 TLM PJC TBG/LNR/GLMS(#1 -#4)UPDATED WELL: F-28B 05/22/04 NORDIC 1 CTD SIDETRACK(F-28A) 10/02/14 TUN PJC SET PXN(9/29/14)-TEMP PLUG FERIu1T No:r2001620 01/16/11 NORDIC 1 CTD SIDETRACK(F-28B) 10/08/14 JMMJMD GLV C/O(10/03/14) AR No: 50-029-21649-02 02/26/11 TQ/PJC SFTY NOTE(COMPOSFTE WRAP) SEC 2,T11N,R13E,2359'FSL&2193'FEL 11/25/13 RKT/JMD GLV GO(11/15/13) 08/28/14 JMD SCHEMATIC CORRECTIONS BP Exploration(Alaska) TREE= SAFET TES: WELL ANGLE>70° '"' WELLHEAD= McEVOY #fl f COMP. .EWRAP REPAIR SH LEAK DO NOT MIT-OA OVER 1200 PSI DUE TO DESIGIr )PRESSURE RATING OF OIB.ELEV= 66.7' PROPOSED REPAIR AND DO NOT PUMP METH OR M ETH BLEW/INTO BE ELEV= 38' i OA DUE TO CHEM INCOMPATIBILITY W/EPDXY RESIN IN KOP= 6700' w p'' Max Angie= '@ Datum MD= O 2085 -14-1/2"OTS SSSV NP D=3.813" Datum ND= 8800'SS GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH SIZE DATE #,L-80 BTRS,D=12.415' '7 '2978 2978 7 1 OTIS DMY RM ' 0 11/15/13 13-3/8'CSG,68 { 2675' '6 '4774'4774 0 OTIS DMY RM ' 0 11/15/13 5 '5904'5903' 1 OTIS DMY RA ' 0 05/20/04 '4 '6640'6638' 8 OTIS DMY RA ' 0 05/20/04 Minimum ID = 1.78" @ -8332' '3 71807161 ' 18 OTIS DMY RA ' 0 05/20/04 WIPER PLUG IN DEPLY SLEEVE 2 7758 7698 24 OTTS DMY RA 0 05/20/04 1 8140 8045 25 OTTS DMY RA 0 05/20/04 8209' H4-1/2"OTIS XA SLICING SLV,D= 3.813" 8268' --1T1WTBG SEAL ASSY 8283' H9-5/8"X 4-1/2" TTW HI-EP PKR,D=4.750" 8288' HA/ILL OUT EXTENSION,D=6.004" -8310' -145 KB LIP(_/_/_i -8315' H3.70"DEPLOY AIEfTSLV,D=3.00' TOP OF 7"LNR H 8321' -t 8321' H 7'BROWN SHORTY HY D.LNR HNGR ^., -8321' H3-1/2"X 2.891"XC),D- 2 70' ---8322' 1-13.27"DEPLOYMENT SL V,D=2.25" ' r 8325' -4-1/2"OTS NH X P,D=3.813" BEHIND CT LNR 8349' H3.70"BKR DEPLOYMENT SLV,D=3.00' I 8357' -4-1/2"OTS XN NP,MILLED ID=3.80" (BBINDCT LM 8369' -I3-1/2'HES X NP,D=2.813"(BBIPD CT LNR) 4-1/2"TBG, 12.6#,L-80 BUTT,.0152 bpf,D=3.958" H 8391' / 8391' -14-1/2"WLEG(BEHIND CT LNR) 3-1/2'LNR,8.81#,L-80 STL,.0087 bpi,ID=2.992' H 8401' 8401• H3-1/2"X 3-3/16"XO,D=2.786" 9-5/8"CSG,47#,L-80 NSCC/BTRS,D=8 681" - 8593' , 8845• ESTMATED CEMENT TOP •�•. 7"LNR 26#,L-80 TC45,.0383 bpf,D=6.276" -H -9073 TOC(_!_t_) H -9100' 3-3/16'BKR PKR WHIPSTOCK(_/_/_) H -9120' 44 3-3l16'MLLOUT WINDOW(F-28C) -9120'--9130' 3-3/16"LNR,6.2#,L-80 TCI,.0076 bpf,D=2.80" H -9120' o- { PERFORATION SUMMARY t 4 REL LOG: r 4 a ANGLE AT TOP FEW @' Note:Refer to Rod uction DB for historical perf data , 4 SIZE SFF INTERVAL Opn/Sqz SHOT SOZ a At, 4 4 PBTD -� �* 2-3/8"LNR, #,L-80_, bpf,D= " -{ -12000' DATE REV BY COMETS DATE FEV BY COM ENTS PRUDHOE BAY L ilT 10112/86 N18E ORIGINAL COMPLETION WELL: F-28C 05/22/04 NORDIC 1 CTD SIDETRACK(F-28A) PERMT No: 01/16/11 NORDIC 1 CTD SIDETRACK(F-28B) API No: 50-029-21649-0" 08/28/14 3M.) B1.LT PROPOSED SEC 2,T11N,,R13E,2359'FSL&2193'Fa BP Exploration(Alaska) a CO CO t Q 0 J 0- Q a) ce co 09 .v a • L a MI M E 5 c,, Q 03N a 0 o • N M 4-' 0 d2 co L r a . V LL O -� " O- o N 1 co a Z''I z m 3 Ln o c7 r. CO O N 0 ,- p co Lo N V 0 V O • CoQ o ,_ a 0 U 0 2 a oE. `° O Li t •d d d N 7 7 « Y d U O n n0 > ..Li U a _iC co Y N a V = 2 Ln > W d d N W W 2 .0 E) M Cl C1 V D C Q Q H Lu 2 7 7 OL C m J J C7 Ci > 7 O °' U m o « c v U, v c is O d t J J C7 L Loa o t a, I F d C N C• c m cd) is E g °o u u cm O O m m V N L IL o O ..d. `y d U N 0 , 7 .0 • 00) 0 Eo U d m .. T d a) 0 0 0 0 .... O K m a �(� � L N N h 00 L L L 0 g `.' p pp J I- r2 Z U) Ul , Lo Qo) 0 7 7 7 N O O CO r CO o M O f- pp O N m co C) CL c7 N d 0 0) Ce 0) co LO a 0) o o t m D o. o o o co h N CD O d V d W rn °) CO t C rt el) OC a C a Zo W U) Lt C ° N d z w •j :... N 0 O Z W o + a O I z a v > 0 Q d N m CIQa ao d d ' °• o 0. G, E N N • co (7 CO U = 7 CO w Cl) L Ll Ll d Z N > > m Q X Q L u_ O O O d W Q j O O O 0 T ct 0 o O O O 0 U) m N Q ~ 0 N N d M d mQ m o in E a ° d o V d d (7 Q f0 d m CO N N m co 1° Ll d N 0 a d Li lL Li d m ° m 2 co oco o N 3 E d d d o N 2 Ln m L v LL 0o coQco 7 Z Q + W o 2 m N N N Z LL 0_ Li Li Li C C O o CD c u C E o c 'o c H o 1, N .m+ 7 d•N d It V C UJ 7 a ° . a rn l jj " m o N Id C CL o a° ° a° c rn ? 4 v N 0 0 :: m Ti •m o A m L°a « o 8 m m o m m m Uain33o a 2c72 in inaa° 3 3 a° 3 0 a > > o O co O O O O O o O O CO o Ln o 0 0 o 0 0 0 0 0 o U O N o O O O N LO N O O '3 C U) co O) CA O CA 0) m m 1 1 V cC m ° O H 0) 0) a d CO N O N coNco CO co O co C) 0 U U) U) c R ? 7 Ui N.: 0) n m Z N ON) 0a) O N V COQ) co V coOco co 0 O N 7 O > — m a I co 3 N M Y 3 3 COO rn O O O O O O O O O N n Z - o CO o O o 0 0 o O o 0 ® O CO O 4 W OO (O OO oi N N N oi L co CO0 N N N NY N U V E co LL ] ] O = mo— m T.' IX 2 O • 001- 2 W CO N LO N CO co N CI W O N O) O) V N- ,- O N co Ma) Ci co 7 O V Di N CO I o) O a) V LO LO CC) CO co co C.) ii co co V V vco co CO CD CD CO N. O C C) C) C) CO' C) C) CO- C) C) 0) C) m L U7 LO LO N U) LO U) LO U') LO N N O CD CD CO CD CO CO CO CO CO CO Y. m m a,• 2 W — 2 c O p C m O m r C •O C V m 7 j m a) co N- in a) V O co co LC) ` C V �.. U7oi O N N. N CO N OCO NCO CO CO 4 :im 0 w Oco O On N C rn cc; N- CO U O w N m U m w 0: �, m a c a) v v_ v Ln Ln co m co rn o CO 4) •° i ) 3 r = N N. C- N. N N N n C- co- N c� O �t Z .(4 rn O CO 0 a) co co a) a) a) a) a) co a) J F- 22 13 ,30 N 0 ' O l0 Y o �. U7 U) LO Lf) U) u) U) U) LO U) U(i E c c t c 0 •o m m o t. U CA 0) U) 0. N. CO LA CO LO � O) O co co O Cu U Z a C 0 CO c7 V O O co co O N CL m d ? V V m co 66 N O C) Cfi d U co co co O N N () N. N CO 0 (0 2 C 2 t` N- (` CO CO 0) 0 0 0 0 I 0 0 Ct. (`O') coNcoOv 0)) ‘.E. V V V N ED O Q n O O Osr N V C N tO CO COco a' Z VV co N CO CO CO CO CO LO C) >" W LO LO N co CO co a) a) O N N Eco 0 tx ,- a Z 0 + 0 Z 7 g O 2 UZ F m 2 - 2 Ni- co LO a) co 0 CO N- N- N- W CO N CD N V co N CO N O N. LO CO CO N LO LO co N- CO co O O CO CO co CO CO Cp co co CO a) O O a) 0) CA 0) 0) N y - CO CO CO co- co- co- CO CO co- CO CO LL 0 co 7 .. E O T 0) O O CO 0 OO LO O O O O U U 0) CO O V D) c sr v, co V N CD a0 CD C) L!) U) N- 0I d O CO N CO N N- co co co N CO .O °°C LLL.. LO N 7 CO V) co¢ N Q C C N (p 0 N O] , W O_ O_ QQ o m a 0 00 O N CO CO (/) O > N N CO O CO CO CO COO CO R sr C co lL LL co co R CO CO CD O N Cn Cn O < ,- CD s- N CO CO O l' O) m r O O O N COC) CO CO CD CO coCD CO co co m O D7 O) O C co T LO 0 O a) co O U 0 • CO c O C O O co O C r O) E CO .a CO 1I F 7 O) W W N 3 N co • N CO O_ a — O u) L L LL 0 0 0 0 o '0 CL CO CO CO 0 O O O ` co N N N 2 Z 0_ CL lL LL lL LS C. o `° 0 CO 0 O O O O O O p)O sr N O O O ¢O O O 6 W (n r- O O O a O V O CO 0 LI') O O O O O O CD CA N >A 0) N O O m 0 CO OI O O '0 o O O O O a r O O CO CO O LL N C 9 O) CO F W co CO O F CO CO CO N 0) N CO 0 CO N CO h V I,- CO CA M 1 T O C ? W CO- [P N 0 N fA a O) O O C 0I co- co T C 0) m co 0) W W V C Ci F LL C S' ` F Y W O LL W CO CL A co 0) CIS V . O C m O Q m O) CO C C O C m CO y CO7 N 00 co c 0 a o O O O O O O O CO O O O O O O CD co O O O O O o U) 7 O O O O O O O -C3 O o cci ui o o ci v o 0 0 o 0 0 0 ' 0) 0) N CD CO CO 01 0) O)CO 01 0) O) O) 0) m d V .... O LL °- O F c CO 0) ,_ C) co N- N V C) 1`.. R N. co V co co co z D) co V - co O co co V O N. 0) O O U) o_ N N O Co o co CO � v v ui o ui v Ci O 0 0) o O O o O O 0) C) N 0 coZ CO 0) O O N N co CO V O O N co Q m E N N N N N N N N N N N N o W 10 7 O > O_' a P_' • J CUl0 N p _ O O O O O Cl O O O O O O O O O Z O O O O O O O O O O O O O O O co O c0 7 a N N N N o N N N N N N N N N N ,O�DpS�pOpH� 0 ,_ .- .- s- s- .- ,- .- .- '- s- .- s- co N LJ l:J C U) O)N ci m m = m d � O - Y Y d . 0 0 d Cr CC O O O 2 W ,� O co co co 0) co O N _ V N O N O V CO LO CO O VCO O N N N CO O 0) 0) O o V O) ad m CCS Ui I- O Gf N N O O O CO CO N- N- N N N 0) C.) .0 co co 0) O N N C) V U) CD N- CO CO O OC C) C) V C V R V 4 V V R V V V R L • d - b' co U) U) co co co co co co co co co N 1f) co OOOOOOOOc0OOO ;: Ii AI Q) OO O 0IOU) NOOOO NOO f� ONOU) ONC O Ou1O O OOOOC) C) C) M 4) NO O OU) Oa0TOOO NC) O C) RVC4- 7CVU) co• Lc- 1. NU) O U) ONOOU) OO O N. N. N N NN1NNhr1. r`0, 0, 0, 0, rnrnm0, m0, 0, cn a)2 U) 0 O . u) coco u) to- v) W co co- vi In cn N co- u) 2 0 0_ N. co co C 7 co .,-CD C) VN O C V) m co co O N CO CO co co co co V co N- O) CC 6 N O) (Ji O O6 O o O6 N 0) O m co co co co O O O O co 07 C) C) V V co co co I. CD 0) O r- N N GE. ,- ,- .- - ,- .- ,_ N N (4 N m M W a I- 0 0 a CO CO CO U) V' CO N V N 0) N- N- CC O N O co N n N N n O) N O Q, a0 N: co m 0) OD CD Ni N- (11N O N. O C) C) CO N N LO O O O I- N dOf co, co 4 V C V O O U) U) co co co co co co z ; ,- a co O CO V O N VO co co V R V O 0) 7 7n N- N. 0) 0) co co co O co O co U) co N O 0) C) U) O 6 V a V C) Ci N co CO Cn 0) 0) 0) co CO CO CO co co co CO co W rn cn cn a) cn m cn o) a) rn a) a) a) a) a) co- oo- O 0 m - - O O N U) U) co co co co cO ✓ CO co m o N- v v v V v a v C Vi UI a V CD N.: N.: m r h Ui Ci 6cn co N- co co O co co N- 0) O co 1- O V I 0 co g v v O co co co co O O 0) W co N 0) O N N co CO co C) C) co N N N N W 0) C) CO CD O O O O O O O O O O Q co CD CO co CO O) W cn o 0) O) m 0) 0) 0) co u > C , v Eco v m c o a O LL cc- 0 0 co p 7 m N N N Z Z d d LL LL LL. O O O O N M O CO 'Cr O O O O O O O O Q O O O O N. O O) O O O O O O O O 00 T o 0 0 0 0 0,0 Ui F 0 0 0 0 0 0 0 o N d CO O O O O O W O O C) U) U) O O U) C) Z O N CO R 7 0 O U) 0 O h CO O O) O N CD- CI O O O O CO O O CO O O O O O vs- C d N m 7 OO - N- ' C LL - LL - coCN. CQ ' D) ' N N N tl' O S. m .. a m C CV Q •-• w 0 d m W N c> aii) 330 If o • O 0 0 0 0 0 0 0 to CO 0 0 0 0 0 0 0 0 0 a 0 0 o o o 0 0 O 0 .5 rn 0) D) 0) CO 0) 0) 0) 0) CO m u — o (a o O H �" o to cO CO CL d o 000 o 0 t? t� co N N O 0 CD coN4] tto N ai 0 CO OcO N) OO) 0 Z 00 0) 0 N e) N) R V Q V .... N N C." C') C7 CO (`') co- e d O CO j O > — X co a) a N 7 7Y O 2 N r Z Q O o O 0 0 0 0 0 0 cop1 CD 0 t co 05 N C N � N N N N N N V V E N 7 Q s LL CO CO a) - 2 0 p .' ct ct 0 O O E .z w tr) 7N 0I V (O C) N 0) O C to N- O O) N: M 0) f0 r co 66 _ y (•) N r r r o ii CO O) O N CO V N CO CD CL C d-' 0() to too tL6 L6 �f) U) lt0 tr) tfj N m CU N H 7 wCD CD CD CD CD CD CD CD 12 g W — o 0 0 C d LO N N O m N c) C7 C) C C V d) C l7 O E 'O C• Cd M 0OD r 0) 0)0) O) (D 0 r r = N O m N w N Pi N N N O O O N O o w 0 N 0 d V D) N CO N N to LO 0 a"- Ct T CO 0) (D CD N- N- N- N- N- r r IR cl)IX t m U t — N n co- N N- N co- co- co- SI to to to J Z V) g Q - D) a) a) a) a) a) a) m m ri CD Ci tri u) u) to to to u) tri tri o) d ZCr) CO CO EN t U 0 CDO co co Tr _ N N co V R (o co el tr) N O ui to m N o m N O O O O O O) O) CD (o V to co r 00 W W o Ccr. N N N N N N N N N CO j W H O U CL (7 v r m V 01 t0 c m M O (h ? q v r m ri m 1--: v of r r o O to r 00 r c0 co O O co Ot ca co V zz 2 d E • (a Z N O O O Oi 0) W 00 a0 c0 00 00 c0 r r r W 41 0) W W W co W a) co- a0 a0 co- 00 00 aO co- 00 co lil co co co co co co co V C V V V ? C C V : to r Oi ,_ M ,_ Oi r r lh 00 tr) co r co o W r co cD N f7 m O) N N — d N N O CD V to tri Vt g r r) o P.' to a o QCO 0 • j N m 0) N N coN coN N N N N N , Q O) O) O) 0) 0) 0) 0) O) O) CO O O O O >. t0 V _ 0 0 0 •N m C C C 0_0 0 t tD 0) O Q O 70 0_ 0 N y p N (rD t°10 O L t 0 0 to D = N 00 N "0 LL CO CO W G m O 2 co N N N O 2 Z Z a 0 LL LL LL 0 0 0 0 0 0 0 CD to 0 0 ¢O O o 0 0 0 0 o N- o 0 0 >. O O O o 0 0 o DC O gi N ZN) v tr0i_ o 0 0 0) 0 0• Yc! « p co N CU O .- C N .a rd s N N N N N N N LL . d R N O) C N O S W N a) W co N 0 O. m 3 3 o a 0 o co a 3 CCI 0 0 1 h CO CO 0- a 0 Z U Q O 0 ct a) CL N J J 3 CO N p n ^ LD In (O Lu 3 Q DD CD 0 N UE Ln = m ) _ E (vWIY = Ca O O H 2 a hi U ii C O m L • d rG c 2 O c m v is 'O f0) N V O N d N R Ud - K V i m t d a o > c o Z A J I- 2 (l) o O IZ N Q' O) a m 7 co co I- _1O a 0cD U 0 0 0 o CO N N o -a N 6 E O N m m E a O v a O O C C O .- N C) V N (O N- CO C) CD N CO V En (D N CO O O o I- ) W V LU OD N- co O) N N N N N N N N N N I- O CO) V O C6 co n] C) n CD CO Lu OCD N- C) O') O CD (D C) CO 0 TI:N En Ln n O En N- N O V V EE+) CO i01 nn 7 7 N O O N O M O O O O O O O 0 0 N N O n n CN 0N N- Ln CD N n N CD 0 0) CO n LD N LO 0) 0 0 N O O 0 O O 0) 7 N- N- N- OO O O 0 O • CO C) R N (D N- CO 0) 0 <- N N CO V In (O n CO 0) O m 4 .- •- .- . . . . . . . . .- n- N N N N N N N N N N N N- E' O O V O co (O 7 N .- N- ,- V C) CO OD Ln co ,- N V N O f- I,- C) V n CO V 0) •- V j0 co (D O 7 C) O V V' n CO •- CD I� OD n N •- N n O N CO C) O <f C) 7 V V CO L3 V n O O n ? N N OD O V n C O OD (O N O n (O N C) O n a ,- O n vv 44 in N O (O (O in C) O N- O C) 00 N in ID (O In I- N- O Ln N- CD N- (D (O O J N ".r Ln Ln Ln (O O O O N C) C) V V 7 N in in In in N CD O I-- n n n I- n I.- n + --- 0_a CO Ln N O O O 0) n CO CD 0) 0) Ln C) N N- Tr n Ln LL] Ln tD C) Ln CD V O CO V C) V (D (O O O •- CO R ID LO CO CO V V LO O Ln N I- N I- N O LO O OO N I- C) O Y (C ,= O n V OD C) N N N N N 00 LO O N N - O O O O O 00 OD I- I- CO OO Ln I/) (.) g C) Ln 6 LD Lu Ln 6 LD LD Ln 6 co (O N Ln N Ln Ln N 4- V V V R R V R V Q y . y) O O 0 O 0 C) CDO O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O0) 0) 0) O O CD a co co co m W m o Of 0) T W W m m 0 0 Di (P W (P fA W (D Of W Di O) LA LA LP m U T Ln • l0 C N CO CC LD O O O O O O O O O O O O 0 0 0 0 O O O O O O O O O O O CDO E a, a v O O O O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 O 0 0 < 0 d a L Oi O O 6 O 6 (J 6 6 O O O O O O O O 6 6 O 0 6 f7 (7 6 C7 O 6 O 6 L 'LO LL OO 00 CO0 O cg O N R CDCDOD OD OD 00 00 O O O 0 0 O O Ln Ln Ln Ln Ln O O O O O O 0 O O D CO N N N • y) O ,- •- N C) (O I- CO O O N C) V CD (O n OD CO O O N CO NI. O n OO CD 0 Z 2 d LL LL (L 2 6 7 O O O O O a, O O O O O O O O O O O O O •- ,- ,- ,- ,- ,- '- N Q C o O M Tdi C R C .. R V p C Q o G N ..• •-. N .0 m C y N .di m 0 • m 0 a 0 0) 0) a U U z 0 a a N n n CO (n (D O 3 Q N co co(D�� 0 co E (n 0 (L• CO CO E a N a- ' a' a C ❑ O O r=- 0 O d t w m 2 C N O C d f6 'O C U 5 d C U O d w N O w "a2. ,d U > m L N O ❑ ❑ O 7 CO J I- 2 Z N ❑ 0 Q N m a LU 1- 0 U >, a CO CO a a) a� > a, 2 a Q Q a m U) U >. N m E7.0 Q o a a L L U U O a co N N N z a a (i ii a Qo T N > 0) T y 4) "4- c C .. .C. p O a) •\- 7 2 w N N y L N U ai • 1 g� F _ N N N & 8 N N 1 N n O go 5 a bc 111111 o - VO 8F , N s a I _ :4111°11:4011111P -�-. N = m LL mai F So $ y = o iva 3F (ut/13Su OSI)(+)y71oN/()IPn�S I c w ° - m R b a a - o CU o e - -- P II a� g _ § t ,�� F0 wvwm,mm� NNNNNNNNamiNe -1 -.- z N a 0 00VD 0 a, C g� vmie<ol 4L a m$S I a (X�1 Trr roa '7!So LN '"vQ964mmmmmrv '" amrnrn i .. .. . Saz _ y3a� �3m0......, ,,,,,,,,,,“,,,,,,,,o 0N a % - N _ . a ra `{ ,„ mg000.-,8me� �2;R_R""c...,..„,_a..s� nQ L', 30 O to c m ry m a�'2 vm O _. nog vun.mrn o`rr,ciM mr a v 00 un Li 00 COmNNAA ` ,A bQ a I - O y 0 rne.-rn vi m n 1 e°$ - >r N Nv,.,,m `a�,.,Ln n,m COMO/ ��o,ry vi�n vi vi �i vi �m mm OmiO0omimw q 41o NO mmmmrnmmmpmmm Wyymmmmmm mmmmmm m mm _y 8 N O- 2 4- 2t�i ' I.,282.??????? ???????????????? m Ian[��N�•�<�m �pNm1�m mml�m0 Nm1�O �^m 1 _� CI N _ mo,.. V- s[0.4.•- moa, JD rmVI� mmmmmmm mma»0/CVCD0/CV01CD010/uauaa �88888888888888888888888888 �,mmmmm.'m8oa000 00000000a m R 4 R 9 4 0 o R o o m o 0 o S o 0 o g q o 4 0 p O 0 � m m$o o m m m m o 0 0$o 0 0 0 0 0 o o O o N C 2 m m 8 r CM 0 6 6 • m a� P 0? 0 20 to'----Nin O ew,mm o.-cvmaee,m NN N N NN N N N Nt7 (ut/Usn OL)gidaQ IeoPaA anti, 1 El 7 ''.'l N iN ;VP N N d W W [z iibio ail mil oy gm N U � R N ■■■ N \\4 ,k LL N m ■■■ ill J ILT 11 III R _p .= N % .117 • ilille. a 0 + t 4 Pi � N 8 1111 ' -.< (1)' -1111 I 11111 ■■\M 1 1111 T........., § ! 32 N 1 ■■■= 7 N aq ■■_,mg 3 .1 1. Ilk . ..6a13 MELA �� a ■■■ \` 111■ _ pa g CD_ EMI.■■■■ ,,,\ I ;7, 2 %i2 8 2 P m I P § 6 ,T . ,,, N N A O 6 § E F. 1 0 (u?RJSn SL)(+)quoN/(-)41noS 1 mvs7,meso2a2aas;4v,PxeaasmWsc';aeg! ill miEgg NNOIa NNNN mCIP424m iN ,�<SS= mmm aR8SS$$xWm�88$ _ iW mNNo c 8888o8NNNNNoB O0,1 NNNNNNNNNNNNNnNNn [VN g33on R O NO O S ^ o P� �[m ;;I42nm a3v n > n F > .1 OS' > n m �N o ry N o `may, N LL LL LL LL ILLp Y LL U. =i �nnn�m000�.-mmemmnm NH��m NNNNN Wei .4 LL• N N - N N N LL ^ m m�mm!m vaem 1 o o IL LL LL LL LL IL LL LLL LL j[ m 3$vnaimm m O t2 N mm v a Vel m m m m mmm nn n n n n pi^ > O N n m m aD R I N. N N N P.. g z u. u.LL LL LL LL LL LL ILL LLL 2 O i'1, g3 U U lL t < , 0 d P 11 2"2c1 Ili 0 4 �" m�mmmmmmmmm mmmmmmmmmmmmmmm LLLL W a_ N -oomoo 0 om m mmmmmmmm > p Qmm J m $ mimmimmmil a 1 t! a O N M N N ss� m m mmmmm mmmmmrn m o ,,-" > > > > > mnnmm - mmmnmmmnmmmnmammn nm 2,12,7 > 4 LL m m ' Q u- j Q '^ r'^'� om QLL a LL lL IL IL N IL 2 .. g m ; -§.8.3oo Y 4 yq a 4 'i '• m e N m Nmmmmm22222mmm mm mmmmmmmmmmmmm a fiommo LL LL It LLY IL ' ^ IL IL 1 U gUN pmmmN y w u- N 0 q E y U a0 N E O u_ IL u_ LL IL Li. li ti. ti LL E E it ` of s 0 0: 4 + 1 + 4 0 1 , + 0 =SA= °' 8 88'88888888888888888888000000mono LLB�m� iri ofamv i mmmWammmm000E000moeee�Nma'mmnm2E om^°imm m„mt� uo__Nmmnmm mm W `iyrNi pp �Nmammnm _ I O p 0 C ;9v 4J-N m.m m n m m 0 m N N N N N N N N N N g - ,Z m 6�W E O m Q m m p 0 3 U C . li O N "� �I N O '� _- ,41/4%1,04 4 00, IL 00 CD 0 o3 iz k3 , a0 N `S m p,— O C a o n m i, l It r4 -Z. 8 N Z !'-9 m _ , 0, 6 EmUa a 0 ° 111111 c LLmm /� \.. � m a as,_ s mE- = r N �x cn N s j— a� O LL O • O O E', O O O O : . O Om -- _ - < O O O O O N 2 t0 < N N V co .- N NO O � U m \ hilli > co _ O N ' m LL LLL LL-- I /” Co)m Z LL N \ m E L.- eta a ai3 av // ./ O 1. 6 LL //u) CV /� m \ , roi N E d f:::wri.••••// Ql - ,s, ,7, II_. : — :mas— 1014.1"117----- N �- LL _ E ;{ f Øbp North America - ALASKA - BP Prudhoe Bay PB F Pad F-28 500292164900 F-28C F-28C Plan 5 Travelling Cylinder Report 20 October, 2014 r' I BAKER HUGHES ,�v�,, B P ��' it 1 `'` Travelling Cylinder Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference Well F-28-Slot 28 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB F Pad MD Reference: ORKB @ 66.71 usft Site Error: 0.00 usft North Reference: True Reference Well: F-28 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore F-28C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: F-28C Plan 5 Offset TVD Reference: Offset Datum Reference F-28C Plan 5 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Interpolation Method MD Interval 25.00usft Error Model: ISCWSA Depth Range: 9,099.16 to 12,000.00usft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,396.88 usft Error Surface: Elliptical Conic Survey Tool Program Date 10/20/2014 From To lusftl (usft) Survey(Wellbore) Tool Name Description 100.00 9,000.01 1 :Sperry-Sun BOSS gyro multi(F-28) BOSS-GYRO Sperry-Sun BOSS gyro multishot 9,069.01 9,099.16 MWD(F-28A) MWD MWD-Standard 9,099.16 9,359.00 F-28C Plan 5(F-28C) INC+TREND Inclinometer+known azi trend 9,359.00 12,000.00 F-28C Plan 5(F-28C) MWD MWD-Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 2,675.00 2,607.88 13 3/8" 13.375 17.500 8,591.00 8,388.53 9 5/8" 9 625 12.250 12,000.00 8,979.22 2-3/8" 2 375 3.250 Summary Reference Offset Centre to No-Go Allowable Measured Measure Centre Distance Deviation Warning Site Name Depth d Distance (usft) from Plan Offset Well-Wellbore-Design lusftl Depth lusft) lusftl PB F Pad F-03-F-03-F-03 Out of range F-03-F-03A-F-03A Out of range F-04-F-04-F-04 11,975.00 10,050.00 1,318.75 380.34 953.74 Pass-Major Risk F-04-F-04A-F-04A 12,000.00 10,925.00 735.89 381.73 354.23 Pass-Major Risk F-04-F-04APB1-F-04APB1 12,000.00 10,950.00 707.69 381.85 325.83 Pass-Major Risk F-04-F-04B-F-04B 11,050.00 11,100.00 1,067.59 362.00 708.78 Pass-Major Risk F-05-F-05-F-05 Out of range F-05-F-05A-F-05A Out of range F-06-F-06-F-06 Out of range F-06-F-06A-F-06A Out of range F-10-F-10-F-10 Out of range F-10-F-10A-F-10A Out of range F-10-F-10B-F-10B 9,134.87 11,379.00 544.68 505.21 66.31 Pass-Major Risk F-10-F-10C-F-10C Out of range F-10-F-10CPB1-F-1 OCPB1 Out of range F-11-F-11-F-11 10,504.82 9,525.00 341.42 21.82 341.18 Pass-Minor 1/100 F-11-F-11 A-F-11 A 10,516.14 9,400.00 379.12 10.39 378.89 Pass-Minor 1/100 F-11-F-11 B-F-11 B 10,500.00 9,375.00 450.94 10.00 450.70 Pass-Minor 1/100 F-15-F-15A-Plan#1(+500) Out of range F-18-F-18-F-18 Out of range F-18-F-18A-F-18A Out of range F-19-F-19-F-19 Out of range F-19-F-19A-F-19A Out of range CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 10/20/2014 9:56:08AM Page 2 COMPASS 5000.1 Build 61 ,�n* BP �� Travelling Cylinder Report BAKER GHESR Company: North America-ALASKA-BP Local Co-ordinate Reference Well F-28-Slot 28 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB F Pad MD Reference: ORKB @ 66.71 usft Site Error: 0.00 usft North Reference: True Reference Well: F-28 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore F-28C Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: F-28C Plan 5 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measure Centre Distance Deviation Warning Site Name Depth d Distance (usft) from Plan Offset Well-Wellbore-Design (usft) Depth (usft) (usft) PB F Pad F-19-F-19B-Plan 2 Out of range F-21-F-21-F-21 Out of range F-21-F-21 P B 1-F-21 P B 1 Out of range F-22-F-22-F-22 Out of range F-22-Plan F-22A-Plan F-22A Out of range F-23-F-23-F-23 12,000.00 9,300.00 1,354.36 373.19 1,084.21 Pass-Major Risk F-23-F-23A-F-23A 12,000.00 9,300.00 1,354.36 373.19 1,084.21 Pass-Major Risk F-24-F-24-F-24 Out of range F-27-F-27-F-27 11,989.08 9,275.00 965.21 370.35 877.22 Pass-Major Risk F-27-F-27A-F-27A 11,989.08 9,275.00 965.21 370.35 877.22 Pass-Major Risk F-27-F-27B-F-27B 11,550.00 12,227.00 490.15 348.95 141.39 Pass-Major Risk F-28-F-28-F-28 9,099.91 9,100.00 1.44 1.39 0.05 Pass-NOERRORS F-28-F-28A-F-28A 9,100.00 9,100.00 0.00 0.55 -0.54 FAIL-NOERRORS F-28-F-28B-F-28B 9,100.00 9,100.00 0.00 0.54 -0.54 FAIL-NOERRORS F-33-F-33-F-33 Out of range F-33-F-33A-F-33A Out of range F-33-F-33APB1-F-33APB1 Out of range F-35-F-35-F-35 Out of range F-36-F-36-F-36 Out of range F-42-F-42-F-42 Out of range F-42-F-42A-F-42A Out of range F-45-F-45B-F-45B Out of range F-46-F-46A-Plan#5 Out of range F-47-F-47-F-47 9,140.00 9,175.00 1,167.71 198.08 975.05 Pass-Major Risk F-47-F-47A-F-47A 9,140.00 9,175.00 1,167.71 198.08 975.05 Pass-Major Risk F-47-F-47B-F-47B 9,140.00 9,175.00 1,167.71 198.08 975.05 Pass-Major Risk Plan Grassroots-Grassroots-Grassroots wp01 Out of range Offset Design PB F Pad- F-04-F-04-F-04 Offset Site Error: 0.00 usft Survey Program: 100-GYD-GC-MS Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Tootace+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (use) (usft) (in) (usft) (usft) (usft) 11,900.00 8,979.63 9,475.00 8,151.25 89.12 26.50 132.96 66225 3,076.26 2.812 1,393.59 356.50 1,103.51 Pass-Major Risk 11,900.00 8,979.63 9,500.00 8,171.68 89.12 26.60 133.75 660.59 3,090.59 2.812 1,384.74 356.78 1,091.95 Pass-Major Risk 11,900.00 8,979.63 9,525.00 8,192.10 89.12 2669 134.55 658.81 3,104.89 2.812 1,376.39 357.07 1,080.88 Pass-Major Risk 11,900.00 8,979.63 9,550.00 8,212.53 89.12 26.79 135.36 656.97 3,119.18 2.812 1,368.49 357.35 1,07028 Pass-Major Risk 11,900.00 8,979.63 9,575.00 8,232.95 89.12 26.88 136.18 655.00 3,133.48 2.812 1,361.11 35763 1,06021 Pass-Major Risk 11,91161 8,979.58 9,600.00 8,253.33 89.18 26.97 135.62 652.87 3,147.80 2812 1,354.15 36120 1,047.92 Pass-Major Risk 11,915.56 8,979.57 9,625.00 8,273.68 89.20 27.07 13600 650.56 3,16213 2.812 1,347.80 362.55 1,037.95 Pass-Major Risk 11,925.00 8,979.53 9,650.00 8,294.04 89.25 27.16 135.73 648.09 3,176.43 2.812 1,342.02 365.31 1,027.14 Pass-Major Risk 11,925.00 8,979.53 9,675.00 8,314.39 89.25 2726 136.61 645.44 3,190.71 2.812 1,336.73 365.58 1,018.97 Pass-Major Risk 11,925.00 8,979.53 9,700.00 8,334.75 89.25 27.35 137.50 642.58 3,204.93 2812 1,332.04 365.86 1,011.44 Pass-Major Risk 11,925.00 8,979.53 9,725.00 8,355.09 89.25 27.44 138.40 639.51 3,219.13 2.812 1,327.99 366.13 1,004.58 Pass-Major Risk 11,934.60 8,979.49 9,750.00 8,375.41 89.30 27.53 138.16 636.24 3,233.33 2.812 1,324.46 368.78 996.12 Pass-Major Risk 11,93826 8,979.47 9,775.00 8,395.72 89.31 27.63 138.65 632.83 3,247.50 2.812 1,321.53 369.92 989.64 Pass-Major Risk 11,950.00 8,979.42 9,800.00 8,416.06 89.38 2772 138.16 629.35 3,261.62 2.812 1,319.14 372.84 982.12 Pass-Major Risk 11,950.00 8,979.42 9,825.00 8,436.40 89.38 27.81 139.10 625.83 3,275.72 2.812 1,317.09 373.10 977.40 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 10/20/2014 9:56:08AM Pape 3 COMPASS 5000.1 Build 61 ir - - - I I o• o Immo_ ► 4 I I Ufa x - \`7 1 I ii: : 1 '1100 . ,2 4::: ..:./ .:. : 10 C4 ., 1:4 1 • i • AR ' I -rr gA 1 oI sw a r 'i1 .,�i 3 11' I a2 2 a I � m • Y ;1 1 s w 1 o g ,_.1 ••I 1 1 O 03 I — I a a ..I .. 1 O I 4 O UJ I 1 — 1 u '. I I -11 2 0= I e. U 1 2 z 1 L," I i hL nw.eo" �' 1 •• . I 0 salI I ' 1 i t -- 7 °\ F f 1 �_ 4 1 1 \ u V v ! I v U 1 I I I 1 \ e I \ ggy W I too I IAI" f -W+I r ,= O m 1 IIII il 'oma U. `s I .‘„ q \ •0 •� ;• U z z 1 it 'i i, \ 1 _JIo I 1 z.. I 1 =•• °� �� L 1 U i I ' x J �� g€i u 1 LI I --, I O 1 = z �I I I z Q I I R I `I F y E x rIf= P. I2 Ia =m I NI CI ii U I 'Et!- a $a "i ,,,, 1 ! 3 1 I ■0 a S 1 I I 2 S OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME: PTD: /C./ �Z Development Service Exploratory Stratigraphic Test Non Conventional FIELD: ;����� POOL: X-2-6.(441/..6).+"6.(< 6c6) / Check Box for Appropriate Letter/ Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI LATERAL The permit is for a new wellbore segment of existing well Permit (If last two digits No. , API No. 50- - - - . in API number are Production should continue to be reported as a function of the original between 60-69) API number stated above. In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name Pilot Hole ( PH) and API number (50- - - - ) from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce / inject is contingent upon issuance of a Spacing Exception conservation order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: Production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application,the following well logs are Well Lo in also required for this well: gg g Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 4/2014 Tar m 0 0 0 0) 0 0 `o m -C- T.) — 7 a 0 la 0 0 o m 0 L O c 0 7 O a3 O 2 co c co a O O > a co W U) L LL V Q O 0 00 O (` - 0 2 c 3 a E O c x o O O co U 0 0 0 N a O Cn C C a U .5 0 - en 3 0 CO O o c � C Li LI 0 O N 3 0 O a) _ a •7 > O o ` 0' 8 .- 0- N N co CD-0 0 @ LL a) N D cO O C C 00 ` c N i 7 N U v 0- o E a 0 .N CD CO 0 0 O -o •N H 0- N 7 d LL J N .L-• L p O (n c6 O N H O t o -0 3 'o co M 0 0) O o �) o co E n a c c 0 a �° 'N O u.) 0' } CO J 4 0 N @ n 0 = 00 co n O N a Q O O N 0 E CO LL r- 0 COo N L.L1 TO Lr)Lu O O N C coece LL T y LO a) M - C NE O) O J = N w a) c0 V _� (n n N `0) d = 0 0 0 LL Ca a "- 3 CO n `) -0 0 0 LO c Nc 0 m .- a) •3 m -0 0 N 3 7 a LK• °° L a ° a a) N (0 Y c .N (/) .N N N E a ami 3 } S Z @ N N n a 0 aci T O) Q cn m 3 3 a) c N@ o rn m co c `o a) O = LLJ a (D 0 N N .0 N cc N M 7 0 — as (Ea 0 a) O 0 .E o 0 0 > in o T E (n ca 7713 a) 0 3 a z 2 00 v c 0 c0i c CO N E o a E -o c w co c "O CO CO o L X CO CO C 0 Zc a' O a O n 7 O co H O m a N a (6 0 LU Lu a 0 o 0 u) u) a a' a s 2 2 I LL a s a > w 0 N Q o aa)i aa)i a) a)i a0) a.) a0i a) a0) 0 Q Q Q Q Q Q Q Q a0) a) a) a) o Q o o a) a0) a) 0 Q o a0) Q Q Q a z } } } >- >- >- } } } } } } Z z z z z z z z } } } } } z } } } } } } z z } z z z T H O O a) 0 Tro co c .--_,U 0 o O Ta a) .. E 3 — E 0 O 0 0 •j c a) 'a-.) 0 C T L 0 T 7 Q 0 c a E c w O E p o o ct c U Q o 0 3 E - 3 0 O U` 0 M 0 U a' 0 c a) Z O J c '5 cO -O 0 c`p 0 as oL D 0 E o Lu as C > c o co N• 0 n m v ° m ani 0 2 0 o x T -o c 3 cm 0 @ Cr 'C HL 0c0o) 4OW n T N @C 0 > 7 O n 0 17n Q o NCJ 0moE 0 . o L -o 0 CO —• L CA 0 U) N a) 7 3 c) Cc C CP L c 0 7 6 In 7 < 0 (n 0 0 0 •• Lu — -O O O N C N d 0- • D 00 C > m 0 N a) n a N C c N O. o O` a) O Q E E = a c c E o M c C n H c 2 otS C o t 0) O N L n c)c U :- c w O 0 Y o O _0 _o o N 0 c Q o O Q) 7 U .n 0- a) U O N d O a '3 2 > T •0 Q 4 O a) a) '� C C O in O O O C 0 O O 0 (9 O 0 M (v Q N 0 'O o p 0 0 0 0 J E D_ 0 0 0 ' _O 0 o a) �c CD m - ° n ° Z o E 3 0 L m 3 0 E a Q - 7 o m m _CD (a 0 0 L L 0 (a ca -7a E ate) o E c 0 0 M m 'N L g o (n o n 0 '. o T 3 C E o Z C 0 co 0 • n n 3 3 ami a0i 0 0 o N '6 3 3 o Q 0 of n '� m ° 3 0 1 0 ° W U O O o c o ° > o ° .0- -o a o ca E o c o 0 o o co 0• o 0 u0i -o 0 (o n O O) o n 0 0 0 a a m a CO 0 0 0 o _ 0 o E 0 E L 0 0 C a) H 0 d 0 _O a s 0 — 0 n N N n c 0 O 0. 2 m m — -O a) ,- N a N E 0) O N N C O c O Q L n r @ rn 0 .3 =o o L CC 0 ns m o O co m 0 n v) W) 0 m o m m m m o m (� 0 0 2 0 0 2 a a N T N 0 0 0 .3 c m C c CT a 0 c ' m = „ n L m 0, o 0 0 a) ami >. 0 an) J .o -O -O -O 0 L L L -O L a) • Ti 0 a) > CA L a) 0 .0 C E LL A4--- a — 0 0 0 m o .0 c C 0 0 c m -a -a 0 '(n co - 3 " a o (n .0 0 0@ c aci h- W 3 a m a aai (o m E 3 7 > 0 0 m m 0 a a) c a) w o ns — C 0 ca 0 Co0 c - C 0 0 0 0 N 0 0 .O-. .0. N 0 N 0 C O 0 0 O CO -0 m r N 0- E '-§ N 'E 0 0 O -o U , (n O o o . (6 (6 n O a) 0 7 0 > > •3 0) 7 7 0 o) di LLl 0 as a a) 0ai J m E N 6 = = = a> 0 0 € E C = 3 n c 12 .2 H H 1- .N a6i zt a > .� a a o e. �' 5 E coq m e m 0 4 E a) 0 0 7 -0 0- n 0 0 CO 0 — m 0 0 7 2 2 2 m a m -0 E O O L 0 �• 0 0 m a) 0 0 a _ ✓ > a J D cn w. O O a a U Q a z 00) 0000 < < 00) 0) 0 2 2 a 0 cn co 0 -_, W n O N CO V LO c0 N- CO CD) O N CO V Cn CO N- CO 0) o N CO V' LO CO N- CO O ✓ 0 ,- N co V CO O r co 0) 7— . . .. . T- N N N N N N N N N N CO CO Cr) CO CO CO Cr) CO CO CO U V 7 V .. O O O 0 2 o c 0 N O N O N 0 0 • N O 0 N 0) 0 ca N O ca N O y C� r• a o `2) o o a) . N >' CO E, _ — a) o o J W a EE a 0 a j 0 a L >. aa a w a c� 4