Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout214-1747. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in thes pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU 11-30A Mill CIBPs, Ext Perf w CTU Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 214-174 50-029-22484-01-00 341J ADL 0028325, 0028321, 0028322 14763 Surface Intermediate Tieback Liner Liner 8750 3947 8928 11136 280 3840 13250 13-3/8" 9-5/8" 7" x 4-1/2" 7" 3-1/2" x 2-7/8" 8793 35 - 3982 2465 - 11393 32 - 11168 11232 - 11512 10923 - 14763 2360 38 - 3725 2420 - 8317 32 - 8192 8228 - 8785 8057 - 8750 None 2260 4760 5410 5410 10530 / 11160 13250, 13875 5020 6870 7240 7240 10160 / 10570 12430 - 14615 4-1/2" 12.6# L-80 32 - 110308785 - 8746 Conductor 78 20" 36 - 114 38 - 116 1490 470 4-1/2" HES TNT Packer No SSSV Installed 10471, 7814 Date: Bo York Operations Manager Dave Bjork david.bjork@hilcorp.com 907.564.4672 PRUDHOE BAY 9/12/2025 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 8:52 am, Sep 02, 2025 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2025.08.29 10:56:05 - 08'00' Bo York (1248) Perforating gun BHA not to exceed 500'. Reestablish pressure containment prior to perforating. Perform and document well control drill on each shift using attached standing orders. Ensure well is dead before breaking containment SFD 9/5/2025 DSR-9/9/25 10-404 JJL 9/4/25 325-534 *&: Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2025.09.10 11:18:23 -08'00'09/10/25 RBDMS JSB 091125 Extended Add Perfs 11-30A PTD: 214-174 Well Name:11-30A API Number:50-029-22484-01 Current Status:Operable - Producer Rig:CTU Estimated Start Date:9/12/25 Estimated Duration:2days Reg.Approval Req’std?10-403 Date Reg. Approval Rec’vd:Check status Regulatory Contact:Carrie Janowski (907) 564-5179 First Call Engineer:David Bjork (907) 564-4672 (907) 440-0331 Current Bottom Hole Pressure:3,240 psi @ 8,800’ TVD 7.1 PPGE Max. Anticipated Surface Pressure:2,360 psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP:470 psi (Taken on 8/07/25) Min ID:2.377” @ 11,486’ MD Max Angle:93 Deg @ 13,333’ MD, 70 Deg at 12,115’ MD Brief Well Summary: 11-30A was sidetracked in February ‘15. The well is a gravity drainage Z1A lateral. The well struggles to sustain flow, even with gaslift. We would like to perforate unswept Z1A and mill both CIBP’s. Objective:Mill plugs and perforate remaining unswept Z1A interval Procedure Coiled Tubing 1. MU 2-1/8” milling assembly with 2-1/4” mill. Tag CIBP at 13,250ft Mill up CIBP and push to next plug at 13,875ft. Mill up second plug. If unsuccessful pick up 2-3/8” shoe and burn over and recover plug(s). Drift to 14,615ft. Note: 2.377” ID at 11,486 ft (liner crossover). 2. MU drift BHA with GR/CCL in 2-1/8” carrier, drift to 12,250ft. 3. Correlate with attached log information. a. Correct flag and send to OE for confirmation. Coil – Extended Perforating Notes: x Remote gas monitoring for H2S and LELs are required for Open Hole Deployment Operations x Due to the necessary open hole deployment of Extended Perforating jobs, 24-hour crew and WSS coverage is required. The well will be killed and monitored before making up the initial perf guns. This is generally done during the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. 1. After MU MHA and pull testing the CTC, tag-up on the CT stripper to ensure BHA cannot pull through the brass upon POOH with guns. 2. Bullhead 1.2x wellbore volume ~220 bbls 1% KCL/SW down tubing. Max tubing pressure 2500 psi. (This step can be performed any time prior to open-hole deployment of the perf guns. Timing of the well kill is at the discretion of the WSS.) a. Wellbore volume to top perf = 176.4 bbls b. 4-1/2” tubing – 10,923’ X .0152 bpf = 166 bbls c. 3-1/2” tubing 10,923’ – 11,486’ X .0087bpf=4.9 bbls d. 2-7/8” liner 11,486’ – 12,430’ (top perf)’ X .0058bpf=5.5 bbls Extended Add Perfs 11-30A PTD: 214-174 3. At surface, prepare for deployment of TCP guns. 4. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/KWF, 8.4 ppg 1% KCl or 8.5 ppg as needed. Maintain hole fill taking returns to tank until lubricator connection is re-established. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. 5.*Perform drill by picking up safety joint with TIW valve and space out before MU guns. Review standing orders with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. e.At the beginning of each job, the crossover/safety joint must be physically MU to the perf guns one time to confirm the threads are compatible. 6.Break lubricator connection at QTS and begin makeup of TCP guns per schedule below. Constantly monitor fluid rates pumped in and fluid returns out of the well. Fluids man-watch must be performed while deploying perf guns to ensure the well remains killed and there is no excess flow. Perf Schedule Use 2.00” Millennium guns or similar (2.2” swell in liquid) Perf Interval (tie-in depths) Total Gun Length Weight of Gun (lbs) Run #1 12,143’ - 12,238’95’~530 lbs (5.58 ppf) 7. RIH with perf gun and tie-in to coil flag correlation. Pickup and perforate interval per Perf Schedule above. a. Note any tubing pressure change in WSR. 8. After perforating, PUH to top of liner or into tubing tail to ensure debris doesn’t fall in on the guns and stick the BHA. Confirm well is dead and re-kill if necessary before pulling to surface. 9. Pump pipe displacement while POOH. Stop at surface to reconfirm well is dead. Kill well if necessary. 10. Review well control steps and Standing Orders with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 11. Ensure safety joint and TIW valve assembly are on-hand before breaking off lubricator to LD gun BHA. 12. RDMO CTU. 13. Turn well over to Operations POP. Attachments: x Wellbore Schematic x Proposed Schematic x Tie-In Log x BOPE Schematic x Standing Orders x Equipment Layout Diagram x Sundry Change Form Extended Add Perfs 11-30A PTD: 214-174 Current Wellbore Schematic Extended Add Perfs 11-30A PTD: 214-174 Proposed Wellbore Schematic 12,143’ - 12,238’ New Perforations Extended Add Perfs 11-30A PTD: 214-174 Tie-in Log Extended Add Perfs 11-30A PTD: 214-174 BOP Schematic Extended Add Perfs 11-30A PTD: 214-174 Extended Add Perfs 11-30A PTD: 214-174 Extended Add Perfs 11-30A PTD: 214-174 Changes to Approved Sundry Procedure Date: Subject: Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HNS Prepared By (Initials) HNS Approved By (Initials) AOGCC Written Approval Received (Person and Date) Approval: Operations Manager Date Prepared: Operations Engineer Date Operator Name:2. Development Exploratory Service… 5 … … Permit to Drill Number:214-174 6.50-029-22484-01-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 14763 10508 7833 10471 None 13875 7814 Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 78 20" 38 - 116 38 - 116 1490 470 Surface 3947 13-3/8" 35 - 3982 38 - 3725 5020 2260 Intermediate 8928 9-5/8" 2465 - 11393 2420 - 8317 6870 4760 Liner 11136 7" 32 - 11168 32 - 8192 7240 5410 Scab Liner 280 7" 11232 - 11512 8228 - 8785 7240 5410 Perforation Depth: Measured depth: 12430 - 14615 feet True vertical depth:8785 - 8746 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# 13Cr85 11030 10471 7814Packers and SSSV (type, measured and true vertical depth) 4-1/2" HES TNT Liner 3842 3-1/2" x 2-7/8" 10924 - 14766 8058 - 8750 10160 / 10570 10530 / 11160 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 78223420436 13818437 935 29451 220 732 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Torin Roschinger toring.roschinger@hilcorp.com Authorized Name:Bo York Authorized Title: Authorized Signature with Date:Contact Phone:(406)570-9630 Treatment descriptions including volumes used and final pressure: 13. Sr. Operations Manager Operations Performed1. Abandon …Plug Perforations …Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG …GINJ …SUSP ……SPLUG 16. Well Status after work:Oil 5 Gas … Exploratory …Development 5 Stratigraphic … 15. Well Class after work: …Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured8750 Sundry Number or N/A if C.O. Exempt: 321-184 No SSSV Installed No SSSV Installe Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … Extended Perforation Operations shutdown … Change Approved Program 5 Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend 5Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well… 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028325, ADL 028322, ADL 028321 PBU 11-30A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations By Samantha Carlisle at 9:18 am, Jun 22, 2021 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2021.06.21 12:56:12 -08'00' Bo York RBDMS HEW 6/28/2021 113 028321 SFD 6/23/2021 SFD 6/23/2021 DSR-6/24/21MGR30JUL2021 ACTIVITYDATE SUMMARY 5/29/2021 CTU6 1.75" CT Job Scope: Drift/Log & Adperf MIRU CTU6. Make up TBird CTC/MHA & 2.20" SLB Logging GR/CCL/2.25" JSN . Bullhead 30 bbls diesel followed by 215 bbls of 2% slick SKI w/Safelube down 13CR tubing. RIH w/SLB logging BHA. Tag CIBP at 13,885.6', PUH 500' and paint white/blue flag at 13,376'. POOH and downloaded data, had a +9' correction confirmed by OE. L&K well at surface with 190bbls of 1% KCL w/SL, monitored losses on TTK and performed no-flow. Deployed 475' of SLB 2" omega guns, RIH w/SLB Gun Run # 1 to flag, corrected EOP @ flag = 13,366.91'. Correct counter to bottom shot, tag CIBP to verify depth. Perforated interval 13,270' - 13,745'. Pooh w/Gun Run #1. ***Job in Progress*** 5/30/2021 CTU6 1.75" CT Job Scope: Drift/Log & Adperf Pooh w/Gun Run #1. Layed down 475' of SLB Gun Run # 1. Deploy 340' of SLB 2" omega guns 6 spf. RIH w/SLB Gun Run #2. Correct depth at coil flag to bottom shot, RIH and confirm CIBP depth. Correct depth to bottom shot based on CIBP depth. PUH to perf interval and shot 12,860-13,200' with SLB 2" PJ Omega guns 6spf 60 degree phasing. Bullheaded 10bbls down CTBS to sweep any gun gas. Pump pipe displacment while POOH. Perform flow check and loss rate on TTK and then pop off well. Lay down gun run #2. Deploy 260' of SLB 2" omega guns 6 spf. RIH w/SLB Gun Run #3. Tag CIBP, correct depth to bottom shot. PUH and perforate interval 12,430' - 12,690'. Pooh w/Gun Run #3. ***Job in Progress*** 5/31/2021 CTU6 1.75" CT Job Scope: Drift/Log & Adperf Pooh w/Gun Run #3. Lay down 260' of SLB 2" omega guns. Secure well, RDMO CTU6. ***Job Complete*** 6/2/2021 LRS Hardline Rig Up on DS 11-30 and OL 11-09 "Temporary Hardline" Begin move, RU, Pause for winds (gusts supposed to die down by 00:00) Continue on WSR 6/3/21 6/3/2021 LRS Hardline Rig Up on DS 11-30 and OL 11-09 "Temporary Hardline" Continue RU, PT, Turned over to Ops, Leave location to Gpad. Job Complete. End WSR 6/8/2021 LRS Well Testers Temporary Hardline RU. IL Well 11-30, OL Well 11-09. Winds dropped below 30mph. Haul equipment to location, Permit signed, RD, Released to Ops. End WSR. Daily Report of Well Operations PBU 11-30A Operator Name:2. Exploratory Development Service… …5 … Permit to Drill Number:214-174 6.API Number:50-029-22484-01-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Field/Pools:9. Well Name and Number: ADL 028325 Property Designation (Lease Number):10. 341H 8. PBU 11-30A 7.If perforating: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Stratigraphic Current Well Class:4. Type of Request:1.Abandon …Plug Perforations …Fracture Stimulate …Repair Well … Operations shutdown CTU extended perforati … Op Shutdown GAS … GSTOR…WAG … SPLUG … … Abandoned Oil 5 WINJ … Exploratory …Development 5Stratigraphic……Service WDSPL … 12. Attachments: PRESENT WELL CONDITION SUMMARY 14763 Effective Depth MD: 13Cr85 11. 4/19/2021 Commission Representative: 15. Suspended … Contact Name: Torin Roschinger Contact Email: Torin.Roschinger@hilcorp.com Authorized Name: Bo York Authorized Title:Operations Manager Authorized Signature: Plug Integrity …BOP Test …Mechanical Integrity Test …Location Clearance … Other: Yes …No …Spacing Exception Required?Subsequent Form Required: Approved by:COMMISSIONER APPROVED BYTHE COMMISSION Date: 5OtherAlter Casing Pull Tubing … Conditions of approval: Notify Commission so that a representative may witness Sundry Number: COMMISSION USE ONLY 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Detailed Operations Program Packers and SSSV Type: No SSSV Installed Packers and SSSV MD (ft) and TVD (ft): Perforation Depth MD (ft):Tubing Size: Size Total Depth MD (ft):Total Depth TVD(ft): 8750 Effective Depth TVD:Plugs (MD):Junk (MD): …Other Stimulate Re-enter Susp Well Suspend … …Plug for Redrill 5Perforate …Perforate New Pool 10471 / 7814 No SSSV Installed Date: Liner 3842 3-1/2" x 2-7/8" 10924 - 14766 8058 - 8750 10160 / 10570 10530 / 11160 Well Status after proposed work: 16. Verbal Approval: … … …Change Approved Program 38 - 116 2465 - 11393 2420 - 8317 14. Estimated Date for Commencing Operations: BOP Sketch 35 - 3982 Conductor 7240 Proposal Summary 13. Well Class after proposed work: 4-1/2" HES TNT 12430 - 14615 8785 - 8746 4-1/2" 12.6#11030 Scab Liner 10508 7834 13875 none 38 - 3725 2260 9-5/8" 7" Contact Phone:(406) 570 - 9630 Date: 4-9-21 5410 3947 502013-3/8"Surface 4760 …GINJ 5 Post Initial Injection MIT Req'd? Yes No … 5 …… … Comm. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 78 20"36 - 114 470 Intermediate 8928 6870 Liner 11136 32 - 11168 32 - 8192 280 7"11232 - 11512 8228 - 8785 7240 5410 Address:3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 3. …No 5Yes Casing Length MD TVD Burst 1490 Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft): Collapse MPSP (psi): Wellbore Schematic … 2470 Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 03/2020 Approved application is valid for 12 months from the date of approval. By Samantha Carlisle at 10:06 am, Apr 09, 2021 321-184 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2021.04.09 10:01:41 -08'00' Bo York SFD 4/9/2021 SFD 4/9/2021 , ADL 028322, ADL 028321 DSR-4/12/21MGR15APR2021 10-404Yption Required? Comm 4/19/21 dts 4/19/2021 RBDMS HEW 4/23/2021 FURy Addperfs 11-30A PTD: 214174 Well Name:11-30A Addperfs API Number: 50-029-22484-01 Current Status:Online Producer Rig:Slickline / Coil Estimated Start Date:Q2 2021 Estimated Duration:3 days Regulatory Contact:Carrie Janowski Permit to Drill Number:214174 First Call Engineer:Torin Roschinger (406) 570-9630 (c) Second Call Engineer: AFE Number: IOR 100 Current Bottom Hole Pressure:3178 psi @ 8,800’ TVD 7.0 PPGE | Taken 05/24/2018 Maximum Expected BHP:3350 psi @ 8,800’ TVD 7.4 PPGE | Average Ivishak BHP) Max. Anticipated Surface Pressure:2470psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP:2110 psi (Taken on 06/19/2018) Min ID:2.377” 3-1/2”x2-7/8” XO @ 11486’ MD Max Angle:93 Deg @ 13333’ Reference Log: Baker RPM PNC 3D - Log Dated 02-Feb-2015 Brief Well Summary: On 11-30A, a coiled tubing sidetrack was completed on Feb 4, 2015 with Nordic 1 to target ~2,500' of Zone 1. The logged light oil column was 31' TVD and 1,425' of initial perforations were added on Feb 3rd, 2015. The well was first POP'd with ASRC on April 14th, 2015 with a 24 hour test showing 1,275 bopd; 41 bwpd; 31.6 mmscfd of gas; 25,000 GOR; and 3.1% WC @ 1,014 psi FTP. However, in October 2015 a CIBP was set to isolate the toe perfs that were bringing in gas due to their close proximity to the GOC making it uncompetitive. After the CIBP was set to isolate the gas coming from the toe and allowed the perforations in the belly of the liner to have more drawdown, the well POP’d at 748bopd, 58bwpd, 3.4mmscfd of gas and GOR of 4,600. However since Oct 2015, there has been very little intervention and rates have declined steadily to 283 bopd; 20 bwpd; 25 mmscfd of gas; 88,000 GOR; and 6.6% WC @ 834 psi FTP in March 2021. Objective: The objective of this program is to increase the performance of the well by re-perforating the existing zones by shooting deeper penetrating guns than originally shot and mitigating fines migration over the last 6 years that may be contributing to the reduction in GFR. Also, the results of this re-perf will be evaluated for additional FURy well re-perf opportunities in the area that have seen GFRs decrease in recent years. An acid stimulation was reviewed for this job, but it was substantially more expensive than using extended addperf deployment and wasn’t economic. Slickline 1. MIRU Slickline Unit and spot ancillary equipment. 2. RIH with a 2-1/8” sample bailer to deviation and collect sample if possible. If sample is collected please note in AWGRS and notify OE. (This step is at the WSL’s discretion.) Sundry Procedure (Approval Required to Proceed): Note: The well will be killed and monitored before making up the initial perfs guns. This is generally done during the drift/logging run. This will provide guidance as to whether the well will be killed by bullheading or circulating bottoms up throughout the job. If pressure is seen immediately after perforating, it will either be killed by bullheading while POOH or circulating bottoms up through the same port that opened to shear the firing head. * o increase the performance of the well by re-perforating the existing zones by shooting deeper penetrating guns t FURy Addperfs 11-30A PTD: 214174 Coil Tubing 1. MIRU Coiled Tubing Unit and spot ancillary equipment. 2. Bullhead 212 bbls of KWF, 8.4 ppg 1% KCl or 8.5 ppg down the tubing to the formation. (This step can be performed any time prior to open-hole deployment of the perf guns. Timing of the well kill is at the discretion of the WSL.) a. Wellbore volume to top perf = 176 bbls b. 4-1/2” Tubing - 10924’ X .0152bpf = 166 bbls c. 3-1/2” Liner – 562’ X .0087bpf = 5 bbls d. 2-7/8” Liner – 2389’ X .0056bpf = 14 bbls (down to CIBP at 13,875’md) 3. MU and RIH with logging tools and drift BHA to resemble 2” dmy gun. Tag WFD CIBP @ 13,875’md and log OOH. 4. POOH and confirm good data. 5. Freeze protect tubing as needed. 6. At surface, prepare for deployment of TCP guns. 7. Confirm well is dead. Bleed any pressure off to return tank. Kill well w/ KWF, 8.4 ppg 1% KCl or 8.5 ppg as needed. Maintain continuous hole fill taking returns to tank until lubricator connection is reestablished. 8.Pickup safety joint and TIW valve and space out before MU guns.Review well control steps with crew prior to breaking lubricator connection and commencing makeup of TCP gun string. Once the safety joint and TIW valve have been spaced out, keep the safety joint/TIW valve readily accessible near the working platform for quick deployment if necessary. 9. Break lubricator connection at QTS and begin makeup of TCP guns per schedule below. 11-30A Perf Schedule *SLB 2” PJO guns were used to estimate for this job and calculate gun weights. Perf Interval Perf Length Gun Length Weight of Gun (lbs) 13270-13745 475 475 2660lbs (5.6ppf) 12860-13200 340 340 1904 12430-12690 260 260 1456 10. RIH with perf gun and tie-in to coil flag correlation and CIBP at 13,875’md. Pickup and perforate interval per Perf Schedule above. POOH. a. Note any tubing pressure change in WSR. 11. POOH. Stop at surface to reconfirm well dead and hole full. 12. Review well control steps with crew prior to breaking lubricator connection and commencing breakdown of TCP gun string. 13. RDMO CTU. 14. RTP or FP well. Attachments: 1. Current Wellbore Schematic 2. Proposed Schematic * See note above regarding kill methods if pressure observed on surface after perforating. Wireline work to utilize PCE. Monitor well for flow return rate greater than flow rate flowing across the top of the well. Standing orders flow chart included with this sundry request. FURy Addperfs 11-30A PTD: 214174 3. Coil Tubing BOPE Schematic 4. Equipment Layout Diagram 5. Standing Orders for Open Hole Well Control during Perf Gun Deployment 6. Mini Log 7. Production Plot 8. Tie In Log/Perf Sheet Current Wellbore Schematic FURy Addperfs 11-30A PTD: 214174 Proposed Schematic FURy Addperfs 11-30A PTD: 214174 FURy Addperfs 11-30A PTD: 214174 Coiled Tubing BOPs FURy Addperfs 11-30A PTD: 214174 Equipment Layout Diagram FURy Addperfs 11-30A PTD: 214174 Standing Orders for Open Hole Well Control during Perf Gun Deployment 11-30 Mini Log FURy Addperfs 11-30A PTD: 214174 Production Plot with GFR Declining Over Time FURy Addperfs 11-30A PTD: 214174 x Initial Well Test After CIBP was Set to Isolate Gas Shown Above – 11/14/2015 892bopd, 57bwpd, 21.6mmscfd x Most recent Well Test – 3/22/2021 – 283bopd, 20bwpd, 25mmscfd 11-30A Tie-In Log FURy Addperfs 11-30A PTD: 214174 FURy Addperfs 11-30A PTD: 214174 FURy Addperfs 11-30A PTD: 214174 FURy Addperfs 11-30A PTD: 214174 FURy Addperfs 11-30A PTD: 214174 STATE OF ALASKA • RECEIVED • ALASKA OIL AND GAS CONSERVATION COMMISSION DEC 0 3 2015 • REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations Q Fracture Stimulate ❑ Pull Tubing 0 Operations shutdown ❑ Suspend ❑ Perforate El Other Stimulate ❑ Alter CasingEl Change Approved Program ❑ Plug for Redrill El Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: je 7L C/t3P 0 2. Operator Name: BP Exploration(Alaska),Inc ' 4. Well Class Before Work 5. Permit to Drill Number 214-174 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory ❑ AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-22484-01-00 7. Property Designation(Lease Number): ADL 0028325 8. Well Name and Number: PBU 11-30A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 14763 feet Plugs measured 13875 feet true vertical 8750 feet Junk measured feet Effective Depth: measured 13875 feet Packer measured See Attachment feet true vertical 8764 feet Packer true vertical See Attachment feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 78 20"91.5#H-40 38-116 38-116 1490 470 Surface 3946 13-3/8"68#NT-80 38-3984 38-3725 5020 2260 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 12430-12690 feet 12860-13200 feet 13270-13745 feet 14215-14280 feet 14330-14615 feet True vertical depth: 8785-8792 feet 8789-8794 feet 8792-8775 feet 8742-8738 feet 8738-8746 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: cx.04MEO FFP 0 8 2016 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 633 35637 22 1991 931 Subsequent to operation: 911 0 56 1427 735 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations Q Exploratory El Development Q Service El Stratigraphic El Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil Q Gas ❑ WDSPL El Printed and Electronic Fracture Stimulation Data ❑ GSTOR El WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature X It - C-47 Phone +1 907 564 4424 Date 12/3/15 Form 10-404 Revised 5/2015 �-L /Z /Z 3/1 5 "�RBD Vp u j 2015 __//// Submit Original Only • Packers and SSV's Attachment PBU 11-30A SW Name Type MD TVD Depscription 11-30A PACKER 11049.29 8126.53 7" Baker ZXP Top Packer 11-30A TBG PACKER 11214.63 8218.24 4-1/2" Baker S-3 Hydro Set Packer 11-30A TBG PACKER 11279.55 8254.27 4-1/2" Baker SABL-3 Packer 11-30A PACKER 12665.4 8791.45 4-1/2"TIW SS Horiz Packer • • • Q.0 0 0 0 0, 0 0 0 0 0 0 0 0 0 Cp r Cp u r O N r O o Nr- 0 V' Cn O V Co U, 1 ton C N r uo r- r- to P- - 0o N- U v O o 0 0 0 0 0 0 0 0 0 0 0 0 L. O) N t V M Cfl 't M co N M Do CD N CO N 0000 00 N co C op O CD 00 up U1 O CD CD M to r 00 Cfl O 00 Cp CA N M O O M 00 to �t r f� r- M M r r co I- h r- N N M 00 00 M 00 00 00 00 00 OO 00 OO 00 H O 6) N- M 6) r r o) M CO 00 V co Co N I- N M CD N co M M co O r r N M f- N- M M N N CO 00 00 00 CO 00 CO CO C CD ,r co co O V N 00 00 N Cp CO O U1 UD 00 to CA CO M I- r N N O CD CO N r0 00 tt r r CO I� N- N O M r M r r r r r N00 r v- (,) V 0 Q— c u, Up CD to Do to M CO CO N N M Cc) ‘— (C) M to CO M CO �t 0 0 `- N V O ti co CO N O r r r N CO � r .Q co a, COU O O 00 00 O \ I— O C U O 0 CD CO U U COCO CD = z 00 M 00 J OD 00 J J M M J Z r r r C N J J O Z Z It u 4t a) • NI-CADM• (C N CVpj U CD op NNaor - °OZO � N r N N r CA (4) 4 N r r co CO N N M Cn 00 fo to M O CO C N- O) O CA Cfl 00 M op O M N up J co CX In r r r CD r W W C E- W C U W W C) 0 OC Et OC Ct Et OC CC a CC Z z Z z W W W W W W W W W m m m C) f- E- zzzzzzzJDJ U Cn — z J J J J J J J F— F- . . . . • • — § 2 (,) E 0 / o -o \ k \ 2 O © 2 G _) 2 0 ai CL ,- 0-- - / 0 & 2 0o / >£ \ \ / as% ? // o ± w ® R * _ _1 0 0 / I § w c 2 0 5 O 8 I ._ / \ / � E � / \ J r oa _ • ee = 3 / \ e 2 \ O o m 2& L$ § '— O .G - e W E2 _ gi/ f / / / )c/ / ( / \ E a% \ + a)ifi e = e ¢ w c Cl) ® \ \ � I \ / \ § ± o > 2 \ _& 02 - f ° 0 co CU < .§ E k § w g $ 6 ° E o 1- 2 # E® ® e U f / % CL - S ? / E � 6 � ea $ ) H _� 0O) 03F/cL\ � k6kC _\ W , 7 06 k c ca"§ o 0 _ 72 . / /_ \� gg % o M $ ./ 0 2 cf % 6 § @ J 00- W $ EIF# 0 -o—o 0 � k ( � /� \ t"0m W © O m & - 0 5 0 o I L q 2 R F CL.® y c a G >1 11 / I U R 0 2 $ --_1 > G » o 0dC 0 ¥ 0 -CS, / R / / \ $ \ % _ / ƒ r � 0 O Et) \ "c7) \ 0 / t \ / / — E $ % a) O 0 ' c.2 n }_ E t & 2 Ro $ � 6% f % / \ 20 n / \ b •E $ § c / o = ? / / � 4- / / 7 % � 7R / O m DE — ) ± e c O e cc : 2 2 < © c. \ R © 5 7 CO L° @ / 0 < .__ T •TRE£ CNV SAFETY NOTES: WELL ANGLE>70°@ 12115'."'MAX WHJJ-EAOR= BAKER C D= CM1 11 -30A DOGLEG:21.1°i§14171""'CHROMETBG&LIR"'#ACTUAT C OKB.ELEV= 62.4' BF.REV= -- , 2224' H 4-1/2'HES X NP D=3.813" KOP 1 20'CONDUCTOR 113' 1 Max Angle= 93°@ 13333' 91.5#,H-40 �' '- GAS LFT MANDRELS Datum MD= NAD=19.124' 1 '.. . ST AD TVD DEV TYPE VLV LATCH FORT D4,TE Datum 1VD= 8800'SS a 5 3953 3702 '41 KBG-2 DOME BK 16 04/03/15 9-5/8"CSG STUB/TOC(12/30/14) -2465'_i 4 6976 5674 r 51 KBG-2 SO BK 20 04/03/15 19-518"DAMAGED CSG(12/27114)1-{-3260'--3342' 3 8836 6894 r 49 KBG-2 I TY BK 0 01/12/15 2 9703 7411 r 57 KBG-2 OW BK 0 01/12/15 13-3/8"CSG,68#,NT-80 BTC,D=12.415" H 3982' A 1 10362 7757 r 58 KBG-2 DAY BK 0 01/12/15 TOC(01/08/15) H4500' " . 2'r. ( 40 Imo 104 -14-1/2"IES X ,D=3.813' Minimum ID = 2.377" a@ 11486' f * 3-1/2" X 2-7/8" XO _� 10471' -I 7"X4-1/2'HES TNT PKR,D=3.856' ' r`, �' 10508' -{4-1/2"HES X MP,D=3.813' 4 . h SEA LBOXRE SUB,D=3.810" H 10732' 4 , 4 I 10618' I4-1/2"I-ES XD SLD SLV,D=3.813(OPEN 1/09/15) TOP OF 3-1/2"X 2-7/8'LNR 10924' isI SEALBOtRE SUB,D=3.810" H 10959' • p "•* w fLTP ACROSS SBS,D=2.972'(01131/15) 1 1 i �� 10845' -14-1/2"HES XO SLD SLV,D=3.813(OPEN 1/09/15) { s 10923' 13.70"BKR DEPLOY SLV,D=3.00" 4-1/2"TBG,12.6#,13CR-85 VAM TOP, -{ 11030' I 10944' --3-1/2"HES X PF,D=2.812" .0152 bpf,I)=3.958" (BTM 10'PERFORATED) �. iI,:7"SCAB LNR,26#,L-80 VAM TOP HC, - 11055' `' 11030' H4-1/ WLBG,D=3.958' .0383 bpf,D=6.276" TOP OF CENNT(02/01/15) -{ 11067 ` 74 11045' -19-5/8"X 7"2XP LTP w J FLIXLOCK HGR D 6.210" 4-1/2'TBG STUB(01/03/15) H 11148' 11111 „ ___I 11168' H9-5/8"X 4-1/2"UMQUE OVERSHOT BEHIND 11182' _4-vr HES X MP,D=3.813" LINER 4-1/2*TBG,12.6#,13CR-80 VAM ACE, H 11249' ► 1. .„.....1 11203' H 9-5/8'X 4-1/2"BKR S-3 FKR,ID=3.875' 0152 bpf,D=3.958" _1 11228' --{4-1/2"HES X MP,D=3.813' 4-112"TBG STUB(06/18/03) H 11248' L *4 11237 -19-5/8"X 7"71EBK,71W LIP &LM2 HGR,D=? 4-1/2'TBG,12.6#,L-80 IDS,.0152 bpf,D=3.958" 11322' H _. ; � 11253' Hr x 4-1/2'UNIQUE OVERSHOT 9.5/8"CSG,47#,NT-80S NSCC,D=8.681" - 11393' 11276' H7"X 4-112'BKR SABL-3 PKR D=3.94' 7'LHR,29#,NT-80 NSCC,.0371 bpf,D=6.181' H 11415' 11310' -14-1/2'HES X NP,D=3.813' 3-1/2"LHR 9.3#,13Cl2 8b STL, 11486' ` '' _! BEHIND !,*; 11322' 14 1/2'WLBCi,D=3.958" .0087 bpf,D=2.992" 4.'4, LINER *+* + 11336' --{ ELMD TT LOGGED 12/16/94 7'X 4-1/2"TT WHIPSTOCK w/RA TAG @-11513' 11513' �!'* 7"LHR,26#,NT-80 NSCC,.0383 bpf,D=6.276" J -11513' t: + ( 11486' -13-1/2-X 2-718"XO,D=2.377" •L* PERFORATION SiJ,L4ARY i '. M&LOUT WINDOW(11-30A)11512'-11520' REF LOG:BKR RPM ON 02/02/15 ` ' ' `w` * , 12800' -12-7/8"RA PUP ST ANGLE AT TOP PERE:88°@12430' +*. Note:Refer to Production DB for historical perf data ■ 13875 CTM-2-7/8"WFD C IBP SIZE SPF INTERVAL Opn/Sqz SHOT SQZ r, . (10/31/15) r 6 12430-12690 0 02/03/15 r 6 12860-13200 O 02/03/15 ' . ; WI 14727' - MID2" 6 13270-13745 0 02/03/15 *- lf . 2" 6 14215-14280 C 02/03/15 ' . ; 4�q�_ 2" 6 14330-14615 C 02/03/15 , "�7' 2-7/8"LMR,6.5#,13CR-85 STL, --{ 14763' 1 - t t .0058 bpf,D=2.441" `AR DATE REV BY COM ENTS DATE REV BY COMMENTS FTJ JHOE BAY UNIT 06/16/94 1428E INITIAL COMPLETION 02/26/15 NS/AD,CORRECTED LIC DEPTHS WELL: 11-30A 06/26/03 N4E5 IRWO 04/06/15 CJNJAD GLV GO(04/03/15) PERMIT No:"2141740 01/13/15 D-16 RWO 11/02/15 JNIJMD SET CEP(10/31/15) API No: 50-029-22484-01 02104/15 NORDIC1 CID(11-30A) SEC 28,T11 N,R15E,1185'FSL&383'FEL 02/11/15 ZB/JMD FIIALODE APPROVAL 02/12/15 PJC ADD CONDUCTOR'FORMARON BP Exploration(Alaska) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. cal 1-4- - 4 7 4" Well History File Identifier Organizing (done) ❑ Two-sided E Rescan Needed RESC N: OVERSIZED: NOTES: olor Items: ❑ Maps: ciXayscale Items: gs: ❑ Poor Quality Originals: ❑ Other: ❑ Other: BY: Maria Date: 6i/O/ f'VltJ /sl flip Project Proofing BY: l "'aria Date: (j 161/5- k5- !s/ rife 1 Scanning Preparation 3 x 30 = / 0 + 1 = TOTAL PAGES 1 (Count does not include cov r sheet) 0 BY: iliEb Date:ip 1101 /s/ Production Scanning Stage 1 Page Count from Scanned File: q c71N. (Count does include covers et) Page Count Matches Number in Scanning Preparation: ( YES imp BY: Date: /'fo/1.s ! / V�/IStage 1 If NO in stage 1, page(s)discrepancieswere foud: YES NO t BY: Maria Date: /s/ Stage 2 Additional Well Reports: YES NO TOTAL PAGES: Digital version appended by: Meredith Michel Date: /s! Final Page9 Count: Stage 1 + Stage 2: TOTAL PAGES: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: Is/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc O • • • v.) o • o in i u) I rn I N 9 Mt m m in m Lo mI • N O co o C7 _W N Z C W O W O LL Hl •,F •4- LL I = N •3 N m N m N 0 0 'd 'a _1 o) UCV _ aNil 2 o W o W •�_ o d n C Q R O 5 w , ZI N ZI N = = M r2 O O Z •fl O ,- O O m m Q @ c` LLI 7 N a 0 0 a 0 0- �1 ' I- 0 a a 0 FL- C N a>� aim '1 o o Z 6 01 m .� Z Z > E O E N O CV O N N D E J 0 0 I 7 CO c U) CO c U) co co m m fO W I I E N co N co co U) LL LL < N it LI) N N Q it LLQ Q Q N N m -- 1N CO N Z C coo 2 °-I -o_ a_ al al OI OI W -Q m ua Q J O U) u>•,. � Q �Q � Q � Q 0 u)11 LT_ N M s— M LL O o cl m 03 al mos al Nal a)�l N�l Nal 0101 a) N N co1 E o N' 0 g if it ii g ii g a O I u ii LL LU m N a E' oa oa oa w ga 2a 2a aU o� ml o o o 1Y o E',•c a N 'c rY •c LY •c CC 'c a 'c a O .E I N :° o) o' 2 E. 2 og •o 2 2 2 rt. 2 2 2 200 I— J U) J N<Im N 01� N OIm N01N 001 NDI ,_ W N_lZ N N N0121 Ce Q E Wc) I Wc)- WM I WM-7 Wo•) Wo') NI W.-Q W W Wc)CO O O CJ c .o u) u) u) u) a) u) in �n EL Y > o 0 0 0 0 0 0 0 0 0 WNN N N N N N N N N N V W W 00 W O CO--- m CP N O CO N IX J N N N N N N N N N N a 1 - W W _i 22 U m o 00 Zo C') Q o alaco A coo coo o coN- _ N v J o 0u) O N. I- 0 55LO c Z tv u) CO G . CV ) CO) (N 0 0 O O N w '- N o• N Tr o E U 0 ns co C O J Q 3a - o az M A LG I"' rco m Z z Lo a J 2 o N J N CO QU O N M mr N J N o C CI "iii o u; Q 0a. oWin Q o ofCC z E z o c� 0 N U o 0 c E - CO CO 13 U Z 7 U) t6 a) a) a) a) a) N a) CO CO CO N y f6 a) a) co a) a) -o a) CO (6 CO 0 E E D O 0 0 O O aas 0 0 0 0 r—co a' Z m m m m m m I m m m m O 0 Z O _ ` D D D D D _1 0 0 0 0 >nr 0 J L. N 0 M CO CO CO CO M CO 11) 1I) Ln UI) •. .21) N N N N N N N N N N N r H ry V 16 E V V 7 V NI- in 10 7 V V N LC) LO LO LO LO LO 2 Q 6 C W O z N N N N N N N N N N N O Q p 1° LL F. V W OU. 0Ni c D d U �_ 2 _ C M U 0 0 0 0 0 0 0 0 0 0 CU7 E 5 Q U) -1 o 0 0 C7 I I- p• - 5):° p• 0 0 0 0 0 0 0 0 0 0 0 a 0 1- 3 -1o1- W W W W LU W .i W W W LU I .3 a. — Ln o r 01 W W o 1 iii ; W ol N a LLI LLI Y _1 LLINOCO 0I- W_ U' W CD U LL Q O HC Z J I I I Z -) U v ti 0) 0_ < LT-LLI LII Q LLI x CO0. Q LT_ o 0 Q �o oLL co co LL Cl) GG) CL) CDN aa)) 0I a LL UUi) th oma•) 7 o 0I 0 U UI 0 7 7 7 7 0 w 0 0 r 0 > > > U cn co co -• a) • > Z I rI To Z �I �I �I ,nl �I c c c c ~ �I �I in D Ecci OJ ET_ o 0 0 0 0 it it it U 0 0 0 > c LL1 E N N N .�. N N I I N N < N LL N < Z Z Z a) Z Z < < < < 1 < < Z Z m it JI co c < co < � E < -3 c2 M M M m M M _-) < W z m y • E • E c1 0 a)ZY w r COI E r MI 0o) r cn 0lo) r MI l- c'')I Va co .- .— el I ,- r)I tC CO j U (n t O O ai co E a6 co 6 co ai co a)co a) ai hi ai aim ai ai ai co a)co D Ti 0-I ai o - LL 0 LL I- LL I- LL a LL I- LL LL LL LL LL LL LL LL = LL H 0 = LL '- LY �0 LY �U ,.9- d' .. LL'0 LLU Jm 11 0 I c) 101 .0 I 0 I cv I v o cv v cv .. v c) 0 I 0 I o � q 7 'cLYF Er — ccc—I 'cceF cLY —I c c c c col c E •ccCF •cCC—I ow 'E Iii, 'c UI N m 200 201 002 200 001 0 0 0 0 oN 2 2 20U 201 � Wp 2or 20 J U N I=IN¢IIU 1C<1_1 01 1 4NVUU aICN oI=I )01 1 v NIN U L a It OOOD000 OO= N0ai 4) 0No0W ) Z O Wr)m WMJ WMJ WMm WMJ W W W W WM W W Wr)m WroJ NI Wr< WQ 0 O U lO in 0!) LI) (O LO LO LI) lO 1I) LI) U) to Lf) O. 0 0 0 0 0 00000 000 0 0 0 W N N N N N N N N N N N N N N N N Ia a) o co a co o cn co o co cn co co co N N Ce O N N N N N N N N N N N N N N CO CO CI. W w J V m o Z 8 Q No CO J o CL v) C o 0 N ON o a U0 v 'O U o J < N Q o"' tomi a.‘— ,— I— rI— 1- z Lo 0 N CO CO Tr NI O a, CO o 0 Q aof I m Q o a z E Q o N d U co co f0 Z cn co co co co CO CO N fD LD N CO @ CD CO N @ CO a) I co co co co ii co m m N N CO m CO CO -0 CO CO 0 0 0 0 O 0 0 0 0 0 0 O 0 0 0 CO 0 0 To- co co co co co co m co co To �D :o To 2 o To co D D D O O D D D O D O D D D 0 0 O er ti > in to CO to Ln Lo 10 10 10 10 10 LO .— _ F N N N N N N N N N N N N N N N CO (O 71. VR V V V V V V V V V V 10 lO lO lO to to lO LO LO r N N N N N N N N N N N N N N N N N N G• fO N. p U w U U U U U U U U U U U U U U U U U 0 O LiE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 w w w w w w w w w w W w w w J w W o I o ' • o I I W I W I W N w w JI w JI °. lj _1 0 a 0 • • r r U 0 •E •E ❑ N Z a a JI JI Z_ JI Z_ N x =1 JI Z Q aa) aa) -, o) U •c •c Q Q LLI Q WI v X m Q LL1CC EC co N o o Z Z Cl) Z >, > % % c1 Z u) M >. >, b LL I lL (/) LL (/) 0 N a) a) LL C/) - ) G) ,.. N _o p 0 01 0 01 0 7 7 0 3 cn r. 0I 0 - Z Z o '� .� 2I 2I HI 2I i- u)to to to to Y a 2 Z cn to Z 01 0I in Lo in Lo c c c c F wI Ul �l = c c co TSlL it it it M N Z Z z z z O O O O OI 01 z z m O a O) i M i _M CC) i s i s , a M M M M m1 M M -) a O Ch fh O N CO � M � M E N-M 0) ; M � M-O c0 .- ,- M �M`,G 2 I I0 1 I . cI aI 0 C.) O ai iii 6 cn1 E aco E acnYai N anY aaaaai Naaai co i co YD aa z Ll_ C1)i m Sv Lc_ce U Et d CO(o 3 ' ' I ' I 1 'v LL Ivvvv I I1 � v E c cCC_ c2_ EX - c2F CQ' - C C C C CCUIC C CCLF_ cce- 0W 'E 'E co ct, 2 2 200 200 201 200 202 O O O O ON 22200201 Q 2 2 (n ca N Na121 Nal=1 t; 0101 t;01I NQ01co 01 N a) N N Nal N N Nal=1 Noo101 vw N N 1X N▪ W LU WMm W co m WMJ W M m WMJ LU LU W LU W co W W W M CO W co J N I W Wit' 0 Z O E LO to LO 10 0 )n LO LO ID LO )n 0 LO )n )n )n LO CI- 5 0 0 0 0 00000 000 E. 00 W N N N N N N N N N NNN N N N N N N M M M M M M M M M M M M Cr) -CO- C+) (`') N N IX O N N N N N N N N N N N N N N N N J CO CO M Cr) M CO CO M Cr) Cr) Cr) Cr) Cr) Cr) c'7 CO a W W V m o 'i z Q ` 7 0 J o 0_ co C o I O O � N n E V zO 0 o J < M Q o M 0. `I— I— 1- z Z _M C 0 G N M •:c V W m NI O a) Sco (I) p 0 Q a ° F''' Q c a Z E G o w IT) U E m z co m m m m ca m m m m CO m CO CO CO CO CO a) CO CO d m CO CO CO CO CO CO CO CO CO m CO CO CO m CO -o m m O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 co 0 0 co :° co co co co m co• CO ._ m ._ CO CO CO a (a I m m• rn .� .5) .a v_) _0) '0, '0 '. '0 'rn 'rn 'rn o) '5 'E o o_) 'o) C O D O _I 0 0 . v F 1 0 CO(O CO (O CO O (0 CO(O CO CO CO CO CO CO(O CO O CO N N ✓ 1 LO M M to M Cn U) M M M CO u7 Li) M M CO CO LO MI to cn cn 1.0LI) cn cn 11) Cn LO LO 1.0 10 cn cn C71 N N N N N N N N N N N N N N N N N N N N E co CI o U +, • U U U 0 0 0 0 U U U U U U U U 0 0 U U 0 O • 0 0 O O 0 0 0 0 0 0 0 0 0 0 0 0 0 p 0 0 a 2 w w w w w w w W LU LU w W w W w w _1 w w o o o I \�/ ��/ ov U Yv N Z ›- } )- II ti Q N o 5 C) w N >"1, A L >. � ^ o n 47 V J a i fE ~ 0 o Q ��. Z Z 0 L t o 4 Q U d m t Q m m m 20 �/�1 W U U co H J o c, o o H I Z co- ' m Q� E Cl) o Imo E )- >- >- CoI— /�/ vW U II o LL d Nm 2 Q O z 7 co m 47 �+ U a m W N •m m co Z b 0 LN 0a 42) CO it E 1 LU x c ca �, a °' V J m Co rn a I m O > £ E Z CO o re 0 0 0 ICC rn ) = --o E a 0 I 5 2 0 0 I N C o 0 0 ....-7.' 1 ON a — E Q v, .1- i � U ® Wo .... 1 e } O E .1- 4:1( Q co c I— a o E Z an To 0 2 m ` z N (0 �y� >- 7 m N E W m N C O E i O m E m co r COV� o m (A m o H o Qre c (0 d o U 43 1 I m c •c a Q a •o co O z E a c o E U I � o 2 o I co U Z u) =1 I N v 1 V o LC) 1N N N = 0 Z /\ v v 1 O l0 Q \ N r 0 ~ Law Lo N y O 0 0 O cp3 N m W C N N m o = y > r> Eco Co O m a`) W io re p co 1 v a) Z Q o c Z o a v U 2 - J y m m _ U 0 " n c o a -o z m 0 E a UO mE 0 o o u. o 2 as 0 o 0 'na� m E E 4 a J 3 Z 0 a 0 10 0 fr ° 1 0 1 0 Oki - 171-- Hunt, Jennifer L (DOA) From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Wednesday, April 22, 2015 11:01 AM To: Hunt, Jennifer L (DOA) Subject: PBU 11-30A/ PTD # 214-174 Categories: Attention Hi Jennifer, Please reference the following well: Well Name. PBU 11-30A Permit#. 214-174 API # 50-029-22484-01-00 Date of Test: 4/14/2015 Type of Test IPT (Initial Production Test) Choke Size: 90 Choke Unit 64ths Production Method: Flowing Duration (Hours Tested): 12 Top Reference (Top Perf MD): 12430' Bottom Reference (Bottom Perf MD): 14615' Tubing Flowing (Pressure): 0 Casing Pressure: 1280 Total Test (Rate f/ 0, W, G). 638/21 / 15833 24-Hour Rate (0, W, G): 1275 /41 /31665 Gravity (Oil, API): N/A GOR (Gas-Oil Ratio): 24835 This well began Production on: 4/13/2015 Method of Operations on this date: Flowing 1 RBDMS3W APR 23 2015 RECEIVED 255(91 APR 0 8 2015 Letter of Transmittal AOGCC BAKER Date: April 8, 2015 HUGHES To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage,Alaska 99501 Anchorage, Alaska 99515 Paula Lacey Paula.Lacey@bakerhughes.com ' I Please find enclosed the TVDSS/MWD data for the following well(s): 11-30A Enclosed for each well(s): 2 hardcopy prints of TVDSS/MWD Final Logs 1 compact disk containing TVDSS/MWD Final Field Data Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: , State of Alaska AOGCC DATE: ------ ------ ------ W! 21 4174 �$ 25624 zo`5' Letter of Transmittal AoGoo- EMI BAKER Date: DATA LOGGED March 30, 2015 M K.BENDER HUGHES To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Paula Lacey paula.lacey@bakerhughes.com Please find enclosed the final directional survey data for the following well(s): 11-30A Enclosed for each well(s): 2 hardcopy prints of final directional survey reports 1 compact disc of final directional survey reports° Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY:! LI17) 6.-2A State of Alaska AOGCC DATE: 1 21 4174 25624 RECEIVED AK 195 • bp AOGCC North America - ALASKA - BP Prudhoe Bay PB DS 11 11-30 - Slot 30 500292248400 11-30A Design: 11-30A Survey Report - Geographic 30 January, 2015 0 bp Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 11-30-Slot 30 Project: Prudhoe Bay TVD Reference: Kelly Bushing/Rotary Table @ 62.40usft(NABORS 4E Site: PB DS 11 MD Reference: Kelly Bushing/Rotary Table @ 62.40usft(NABORS 4E. Well: 11-30 North Reference: True Wellbore: 11-30A Survey Calculation Method: Minimum Curvature Design: 11-30A Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 11,TR-11-15 Site Position: Northing: 5,949,527.78 usft Latitude: 70°15'55.850 N From: Map Easting: 707,585.65 usft Longitude: 148°19'17.13 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.58° Well 11-30 API No. 500292248400 Well Position +N/-S 0.00 usft Northing: 5,952,898.81 usft Latitude: 70°16'29.115 N +E/-W 0.00 usft Easting: 707,134.58 usft Longitude: 148°19'27.56 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 27.20 usft Wellbore 11-30A API no. 500292248401 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2014 8/12/2014 19 86 81 03 57,612 Design 11-30A Audit Notes: Version: Phase: ACTUAL Tie On Depth: 11,463.00 Vertical Section: Depth From(TVD) +N/-S +EI-W Direction (usft) (usft) (usft) (°) 34.40 0.00 0.00 317.27 Survey Program • Date: 1/30/2015 From To (usft) (usft) Survey(Wellbore) Tool Name Description 145.00 11,463.00 1 :MWD-Standard(11-30) MWD MWD-Standard 11,504.50 14,728.29 CoilTrak MWD(11-30A) MWD MWD-Standard 1/30/2015 9:25:51AM Page 2 COMPASS 5000.1 Build 61 (ti by Survey Report-Geographic 0.0 Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 11-30-Slot 30 Project: Prudhoe Bay ND Reference: Kelly Bushing/Rotary Table @ 62.40usft(NABORS 4E'; Site: PB DS 11 MD Reference: Kelly Bushing/Rotary Table @ 62.40usft(NABORS 4E• Well: 11-30 North Reference: True Wellbore: 11-30A Survey Calculation Method: Minimum Curvature Design: 11-30A Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 34.40 0.00 0.00 34.40 0.00 0.00 5,952,898.81 707,134.58 70°16'29.115 N 148°19'27.56 W 145.00 0.30 96.60 145.00 -0.03 0.29 5,952,898.78 707,134.86 70°16'29.115 N 148°19'27.55 W 238.00 0.40 114.10 238.00 -0.19 0.83 5,952,898.64 707,135.41 70°16'29.113 N 148°19'27.53 W 328.00 0.70 143.90 327.99 -0.77 1.44 5,952,898.08 707,136.03 70°16'29.108 N 148°19'27.52 W 418.00 0.70 150.90 417.99 -1.69 2.03 5,952,897.17 707,136.65 70°16'29.099 N 148°19'27.50 W 508.00 0.60 4.60 507.98 -1.70 2.33 5,952,897.17 707,136.95 70°16'29.098 N 148°19'27.49 W 598.00 3.80 352.60 597.91 1.73 1.99 5,952,900.59 707,136.51 70°16'29.132 N 148°19'27.50 W 688.00 6.20 351.50 687.56 9.49 0.88 5,952,908.32 707,135.20 70°16'29.208 N 148°19'27.53 W 778.00 6.80 351.50 776.98 19.57 -0.62 5,952,918.35 707,133.42 70°16'29.308 N 148°19'27.58 W 872.00 6.30 350.10 870.37 30.15 -2.33 5,952,928.88 707,131.42 70°16'29.412 N 148°19'27.62 W 967.00 6.40 345.50 964.78 40.41 -4.55 5,952,939.08 707,128.91 70°16'29.513 N 148°19'27.69 W 1,063.00 6.80 345.60 1,060.15 51.10 -7.31 5,952,949.68 707,125.87 70°16'29.618 N 148°19'27.77 W 1,158.00 8.10 346.50 1,154.34 63.05 -10.27 5,952,961.55 707,122.58 70°16'29.735 N 148°19'27.86 W 1,253.00 10.10 350.00 1,248.14 77.77 -13.28 5,952,976.18 707,119.16 70°16'29.880 N 148°19'27.94 W 1,348.00 10.60 343.50 1,341.60 94.35 -17.20 5,952,992.64 707,114.78 70°16'30.043 N 148°19'28.06 W 1,444.00 10.90 337.30 1,435.92 111.19 -23.22 5,953,009.31 707,108.31 70°16'30.209 N 148°19'28.23 W 1,538.00 11.10 342.20 1,528.19 128.00 -29.41 5,953,025.95 707,101.65 70°16'30.374 N 148°19'28.41 W 1,634.00 12.10 341.40 1,622.23 146.34 -35.45 5,953,044.11 707,095.12 70°16'30.554 N 148°19'28.59 W 1,729.00 13.70 345.10 1,714.83 166.65 -41.51 5,953,064.24 707,088.49 70°16'30.754 N 148°19'28.77 W 1,825.00 14.00 345.40 1,808.04 188.87 -47.37 5,953,086.30 707,082.03 70°16'30.973 N 148°19'28.94 W 1,920.00 14.40 347.00 1,900.14 211.50 -52.92 5,953,108.76 707,075.86 70°16'31.195 N 148°19'29.10 W 2,015.00 15.20 345.40 1,991.99 235.07 -58.72 5,953,132.16 707,069.41 70°16'31.427 N 148°19'29.27 W 2,110.00 17.00 345.20 2,083.26 260.55 -65.40 5,953,157.44 707,062.03 70°16'31.678 N 148°19'29.46 W 2,206.00 17.60 344.70 2,174.91 288.11 -72.82 5,953,184.79 707,053.86 70°16'31.949 N 148°19'29.68 W 2,301.00 17.80 344.30 2,265.42 315.95 -80.54 5,953,212.40 707,045.38 70°16'32.222 N 148°19'29.90 W 2,396.00 18.70 341.00 2,355.64 344.33 -89.42 5,953,240.52 707,035.71 70°16'32.502 N 148°19'30.16 W 2,491.00 22.60 334.30 2,444.53 375.19 -102.31 5,953,271.02 707,021.99 70°16'32.805 N 148°19'30.54 W 2,587.00 19.90 335.20 2,534.00 406.65 -117.16 5,953,302.06 707,006.27 70°16'33.115 N 148°19'30.97 W 2,681.00 20.50 338.40 2,622.22 436.48 -129.93 5,953,331.52 706,992.69 70°16'33.408 N 148°19'31.34 W 2,777.00 22.50 341.50 2,711.53 469.53 -141.95 5,953,364.23 706,979.76 70°16'33.733 N 148°19'31.69 W 2,872.00 25.70 345.10 2,798.25 506.69 -153.02 5,953,401.06 706,967.68 70°16'34.098 N 148°19'32.01 W 2,967.00 24.80 347.20 2,884.17 546.02 -162.73 5,953,440.12 706,956.89 70°16'34.485 N 148°19'32.30 W 3,062.00 25.30 345.10 2,970.24 585.07 -172.36 5,953,478.88 706,946.18 70°16'34.869 N 148°19'32.58 W 3,157.00 27.70 345.80 3,055.25 626.10 -183.00 5,953,519.60 706,934.42 70°16'35.273 N 148°19'32.89 W 3,253.00 30.30 346.10 3,139.21 671.24 -194.29 5,953,564.42 706,921.89 70°16'35.717 N 148°19'33.21 W 3,348.00 32.40 344.20 3,220.33 719.00 -206.98 5,953,611.81 706,907.89 70°16'36.187 N 148°19'33.58 W 3,444.00 34.00 342.90 3,300.66 769.41 -221.88 5,953,661.78 706,891.61 70°16'36.682 N 148°19'34.02 W 3,539.00 35.80 342.20 3,378.57 821.26 -238.18 5,953,713.16 706,873.89 70°16'37.192 N 148°19'34.49 W 3,634.00 37.00 339.80 3,455.04 874.55 -256.55 5,953,765.92 706,854.06 70°16'37.716 N 148°19'35.03 W 3,730.00 38.50 337.80 3,530.95 929.33 -277.82 5,953,820.09 706,831.30 70°16'38.255 N 148°19'35.65 W 3,824.00 40.00 336.60 3,603.74 984.15 -300.87 5,953,874.25 706,806.74 70°16'38.794 N 148°19'36.32 W 3,917.00 41.20 334.00 3,674.36 1,039.11 -326.17 5,953,928.50 706,779.94 70°16'39.335 N 148°19'37.06 W 4,051.00 41.10 333.60 3,775.26 1,118.23 -365.10 5,954,006.51 706,738.85 70°16'40.113 N 148°19'38.19 W 4,147.00 41.80 330.40 3,847.22 1,174.32 -394.94 5,954,061.75 706,707.48 70°16'40.664 N 148°19'39.06 W 4,242.00 43.80 330.30 3,916.92 1,230.41 -426.87 5,954,116.94 706,674.02 70°16'41.216 N 148°19'39.99 W 4,338.00 46.10 330.10 3,984.86 1,289.26 -460.58 5,954,174.84 706,638.71 70°16'41.795 N 148°19'40.97 W 4,433.00 47.50 327.80 4,049.89 1,348.57 -496.30 5,954,233.14 706,601.36 70°16'42.378 N 148°19'42.01 W 4,529.00 48.70 328.10 4,114.00 1,409.14 -534.22 5,954,292.63 706,561.80 70°16'42.974 N 148°19'43.11 W 4,623.00 50.40 330.40 4,174.99 1,470.61 -570.77 5,954,353.07 706,523.57 70°16'43.578 N 148°19'44.18 W 4,719.00 51.20 330.40 4,235.67 1,535.29 -607.52 5,954,416.72 706,485.06 70°16'44.214 N 148°19'45.25 W 4,814.00 49.80 332.20 4,296.09 1,599.58 -642.73 5,954,480.01 706,448.10 70°16'44.847 N 148°19'46.28 W 4,909.00 48.60 334.70 4,358.17 1,663.90 -674.88 5,954,543.41 706,414.19 70°16'45.479 N 148°19'47.21 W 5,004.00 49.00 331.30 4,420.76 1,727.56 -707.33 5,954,606.16 706,380.00 70°16'46.105 N 148°19'48.16 W 5,100.00 50.00 331.60 4,483.11 1,791.69 -742.21 5,954,669.29 706,343.36 70°16'46.736 N 148°19'49.17 W 5,195.00 50.50 331.00 4,543.85 1,855.75 -777.29 5,954,732.36 706,306.54 70°16'47.366 N 148°19'50.20 W 1/30/2015 9:25:51AM Page 3 COMPASS 5000.1 Build 61 ® Z bp Survey Report-Geographic iyya Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 11-30-Slot 30 Project: Prudhoe Bay TVD Reference: Kelly Bushing/Rotary Table @ 62.40usft(NABORS 4E Site: PB DS 11 MD Reference: Kelly Bushing/Rotary Table @ 62.40usft(NABORS 4E Well: 11-30 North Reference: True Wellbore: 11-30A Survey Calculation Method: Minimum Curvature Design: 11-30A Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude ,... 5,290.00 50.20 332.50 4,604.47 1,920.18 -811.91 5,954,795.81 706,270.16 70°16'48.000 N 148°19'51.20 W 5,386.00 50.70 332.50 4,665.60 1,985.84 -846.09 5,954,860.50 706,234.19 70°16'48.645 N 148°19'52.20 W 5,481.00 50.80 333.20 4,725.71 2,051.30 -879.66 5,954,925.01 706,198.83 70°16'49.289 N 148°19'53.18 W 5,575.00 50.50 333.10 4,785.31 2,116.15 -912.49 5,954,988.93 706,164.23 70°16'49.927 N 148°19'54.13 W 5,671.00 49.30 332.40 4,847.15 2,181.43 -946.11 5,955,053.26 706,128.83 70°16'50.569 N 148°19'55.11 W 5,767.00 49.00 332.90 4,909.94 2,245.93 -979.47 5,955,116.81 706,093.70 70°16'51.203 N 148°19'56.08 W 5,861.00 49.00 333.20 4,971.61 2,309.17 -1,011.62 5,955,179.14 706,059.83 70°16'51.825 N 148°19'57.02 W 5,955.00 49.90 333.80 5,032.72 2,373.09 -1,043.49 5,955,242.15 706,026.21 70°16'52.454 N 148°19'57.95 W 6,051.00 51.40 332.50 5,093.59 2,439.32 -1,077.02 5,955,307.43 705,990.87 70°16'53.105 N 148°19'58.93 W 6,147.00 51.60 332.00 5,153.35 2,505.80 -1,112.01 5,955,372.92 705,954.07 70°16'53.759 N 148°19'59.95 W 6,243.00 52.00 332.70 5,212.72 2,572.63 -1,147.01 5,955,438.76 705,917.24 70°16'54.416 N 148°20'0.97 W 6,337.00 51.40 332.90 5,270.97 2,638.24 -1,180.73 5,955,503.41 705,881.73 70°16'55.061 N 148°20'1.95 W 6,433.00 50.90 332.40 5,331.19 2,704.65 -1,215.08 5,955,568.84 705,845.57 70°16'55.714 N 148°20'2.95 W 6,529.00 50.40 331.00 5,392.07 2,770.01 -1,250.27 5,955,633.21 705,808.59 70°16'56.357 N 148°20'3.97 W 6,624.00 51.30 331.30 5,452.04 2,834.54 -1,285.82 5,955,696.73 705,771.29 70°16'56.992 N 148°20'5.01 W 6,720.00 51.50 331.80 5,511.94 2,900.50 -1,321.56 5,955,761.68 705,733.75 70°16'57.640 N 148°20'6.05 W 6,815.00 50.50 332.90 5,571.72 2,965.90 -1,355.82 5,955,826.11 705,697.70 70°16'58.283 N 148°20'7.05 W 6,910.00 50.30 332.90 5,632.28 3,031.06 -1,389.17 5,955,890.32 705,662.57 70°16'58.924 N 148°20'8.02 W 7,006.00 50.60 334.80 5,693.41 3,097.50 -1,421.79 5,955,955.84 705,628.14 70°16'59.578 N 148°20'8.97 W 7,102.00 50.50 333.60 5,754.41 3,164.24 -1,454.05 5,956,021.66 705,594.05 70°17'0.234 N 148°20'9.91 W 7,196.00 49.90 331.50 5,814.58 3,228.32 -1,487.33 5,956,084.80 705,559.02 70°17'0.864 N 148°20'10.88 W 7,293.00 48.60 331.30 5,877.90 3,292.84 -1,522.51 5,956,148.32 705,522.09 70°17'1.499 N 148°20'11.91 W 7,389.00 48.30 329.70 5,941.58 3,355.36 -1,557.88 5,956,209.85 705,485.01 70°17'2.113 N 148°20'12.94 W 7,484.00 49.20 331.70 6,004.22 3,417.65 -1,592.82 5,956,271.14 705,448.36 70°17'2.726 N 148°20'13.96 W 7,579.00 49.50 331.10 6,066.10 3,480.93 -1,627.32 5,956,333.45 705,412.13 70°17'3.348 N 148°20'14.96 W 7,675.00 48.50 329.90 6,129.09 3,543.99 -1,663.00 5,956,395.50 705,374.74 70°17'3.968 N 148°20'16.00 W 7,770.00 48.60 330.80 6,191.97 3,605.87 -1,698.22 5,956,456.38 705,337.83 70°17'4.577 N 148°20'17.03 W 7,866.00 49.20 331.30 6,255.08 3,669.17 -1,733.23 5,956,518.69 705,301.09 70°17'5.199 N 148°20'18.05 W 7,961.00 49.00 331.20 6,317.28 3,732.13 -1,767.77 5,956,580.67 705,264.83 70°17'5.818 N 148°20'19.06 W 8,056.00 48.90 328.50 6,379.68 3,794.07 -1,803.75 5,956,641.59 705,227.17 70°17'6.428 N 148°20'20.10 W 8,151.00 49.10 329.60 6,442.00 3,855.56 -1,840.62 5,956,702.04 705,188.62 70°17'7.032 N 148°20'21.18 W 8,246.00 49.40 329.60 6,504.01 3,917.63 -1,877.04 5,956,763.08 705,150.51 70°17'7.643 N 148°20'22.24 W 8,341.00 49.10 329.60 6,566.03 3,979.70 -1,913.46 5,956,824.13 705,112.39 70°17'8.253 N 148°20'23.30 W 8,437.00 48.30 330.40 6,629.39 4,042.16 -1,949.52 5,956,885.56 705,074.63 70°17'8.867 N 148°20'24.35 W 8,533.00 48.10 329.90 6,693.37 4,104.23 -1,985.14 5,956,946.63 705,037.32 70°17'9.478 N 148°20'25.39 W 8,628.00 48.40 329.90 6,756.63 4,165.55 -2,020.68 5,957,006.94 705,000.10 70°17'10.081 N 148°20'26.43 W 8,723.00 48.80 329.90 6,819.46 4,227.20 -2,056.42 5,957,067.58 704,962.68 70°17'10.687 N 148°20'27.47 W 8,817.00 49.10 330.60 6,881.19 4,288.75 -2,091.60 5,957,128.13 704,925.82 70°17'11.292 N 148°20'28.49 W 8,911.00 50.00 327.60 6,942.18 4,350.10 -2,128.33 5,957,188.45 704,887.41 70°17'11.895 N 148°20'29.56 W 9,006.00 50.70 325.50 7,002.80 4,411.12 -2,168.65 5,957,248.34 704,845.43 70°17'12.495 N 148°20'30.74 W 9,099.00 52.20 326.40 7,060.76 4,471.39 -2,209.37 5,957,307.45 704,803.07 70°17'13.088 N 148°20'31.93 W 9,193.00 53.40 323.40 7,117.60 4,532.62 -2,252.43 5,957,367.48 704,758.35 70°17'13.690 N 148°20'33.18 W 9,288.00 54.20 322.30 7,173.71 4,593.72 -2,298.73 5,957,427.28 704,710.39 70°17'14.291 N 148°20'34.53 W 9,381.00 54.60 322.50 7,227.85 4,653.63 -2,344.86 5,957,485.89 704,662.62 70°17'14.880 N 148°20'35.88 W 9,476.00 54.90 320.40 7,282.68 4,714.30 -2,393.21 5,957,545.20 704,612.63 70°17'15.476 N 148°20'37.28 W 9,571.00 55.40 321.60 7,336.97 4,774.89 -2,442.27 5,957,604.41 704,561.92 70°17'16.072 N 148°20'38.71 W 9,665.00 56.00 318.30 7,389.95 4,834.31 -2,492.23 5,957,662.43 704,510.35 70°17'16.656 N 148°20'40.17 W 9,758.00 57.60 318.30 7,440.87 4,892.41 -2,543.99 5,957,719.09 704,457.00 70°17'17.228 N 148°20'41.68 W 9,851.00 58.40 319.70 7,490.15 4,951.93 -2,595.73 5,957,777.16 704,403.65 70°17'17.813 N 148°20'43.19 W 9,944.00 58.50 322.30 7,538.82 5,013.52 -2,645.60 5,957,837.34 704,352.11 70°17'18.418 N 148°20'44.64 W 10,039.00 58.60 320.20 7,588.39 5,076.72 -2,696.32 5,957,899.12 704,299.67 70°17'19.040 N 148°20'46.12 W 10,134.00 58.60 319.90 7,637.89 5,138.88 -2,748.39 5,957,959.82 704,245.91 70°17'19.651 N 148°20'47.64 W 10,228.00 58.80 320.90 7,686.72 5,200.76 -2,799.59 5,958,020.27 704,193.03 70°17'20.259 N 148°20'49.13 W 10,323.00 58.50 319.70 7,736.15 5,263.18 -2,851.41 5,958,081.24 704,139.52 70°17'20.873 N 148°20'50.64 W 10,419.00 58.10 319.70 7,786.59 5,325.48 -2,904.24 5,958,142.05 704,085.00 70°17'21.486 N 148°20'52.18 W 1/30/2015 9:25:51AM Page 4 COMPASS 5000.1 Build 61 0 bp Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 11-30-Slot 30 Project: Prudhoe Bay TVD Reference: Kelly Bushing/Rotary Table @ 62.40usft(NABORS 4E• Site: PB DS 11 MD Reference: Kelly Bushing/Rotary Table @ 62.40usft(NABORS 4E Well: 11-30 North Reference: True Wellbore: 11-30A Survey Calculation Method: Minimum Curvature Design: 11-30A Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude ..,_ Y, 10,514.00 57.90 320.20 7,836.94 5,387.15 -2,956.08 5,958,202.27 704,031.48 70°17'22.092 N 148°20'53.69 W 10,608.00 57.70 321.30 7,887.03 5,448.74 -3,006.40 5,958,262.45 703,979.48 70°17'22.697 N 148°20'55.16 W 10,703.00 57.40 320.80 7,938.00 5,511.09 -3,056.80 5,958,323.38 703,927.39 70°17'23.310 N 148°20'56.63 W 10,797.00 57.30 321.20 7,988.72 5,572.60 -3,106.61 5,958,383.49 703,875.91 70°17'23.915 N 148°20'58.08 W 10,891.00 57.00 321.61 8,039.71 5,634.32 -3,155.87 5,958,443.83 703,824.97 70°17'24.522 N 148°20'59.52 W 10,985.00 56.70 320.60 8,091.11 5,695.57 -3,205.28 5,958,503.69 703,773.89 70°17'25.124 N 148°21'0.96 W 11,079.00 56.30 321.30 8,142.99 5,756.44 -3,254.66 5,958,563.18 703,722.86 70°17'25.723 N 148°21'2.40 W 11,173.00 56.30 321.10 8,195.15 5,817.39 -3,303.67 5,958,622.75 703,672.20 70°17'26.322 N 148°21'3.82 W 11,268.00 56.30 320.20 8,247.86 5,878.50 -3,353.78 5,958,682.46 703,620.43 70°17 26.923 N 148°21'5.29 W 11,333.00 56.30 321.60 8,283.92 5,920.47 -3,387.88 5,958,723.47 703,585.18 70°17'27.335 N 148°21'6.28 W 11,463.00 57.45 322.91 8,354.97 6,006.56 -3,454.52 5,958,807.69 703,516.20 70°17'28.182 N 148°21'8.22 W T1P 11,504.50 57.62 322.02 8,377.24 6,034.32 -3,475.85 5,958,834.86 703,494.12 70°17'28.455 N 148°21'8.85 W KOP 11,529.88 56.44 321.00 8,391 05 6,050.99 -3,489.10 5,958,851.15 703,480.41 70°17'28.619 N 148°21'9.23 W Interpolated Azimuth 11,560.29 54.24 318.00 8,408.35 6,070.01 -3,505.34 5,958,869.72 703,463.66 70°17'28.806 N 148°21'9.70 W Interpolated Azimuth 11,590.15 51.92 314.00 8,426.29 6,087.18 -3,521.90 5,958,886.43 703,446.63 70°17'28.974 N 148°21'10.19 W Interpolated Azimuth 11,620.17 50.02 311.00 8,445.20 6,102.94 -3,539.09 5,958,901.70 703,429.02 70°17'29.129 N 148°21'10.69 W Interpolated Azimuth 11,653.30 48.39 309.97 8,466.84 6,119.23 -3,558.16 5,958,917.46 703,409.51 70°17'29.289 N 148°21'11.24 W 11,679.78 47.36 310.25 8,484.60 6,131.88 -3,573.18 5,958,929.69 703,394.14 70°17'29.414 N 148°21'11.68 W 11,709.65 47.47 306.48 8,504.82 6,145.52 -3,590.42 5,958,942.86 703,376.54 70°17'29.548 N 148°21'12.19 W 11,739.64 46.59 301.02 8,525.27 6,157.71 -3,608.65 5,958,954.54 703,357.98 70°17'29.668 N 148°21'12.72 W 11,769.68 47.16 295.46 8,545.81 6,168.07 -3,627.95 5,958,964.36 703,338.40 70°17'29.769 N 148°21'13.28 W 11,799.70 47.39 290.00 8,566.19 6,176.59 -3,648.28 5,958,972.31 703,317.85 70°17'29.853 N 148°21'13.87 W 11,829.61 48.20 284.96 8,586.29 6,183.23 -3,669.40 5,958,978.37 703,296.55 70°17'29.918 N 148°21'14.49 W 11,858.78 48.49 278.84 8,605.69 6,187.72 -3,690.71 5,958,982.27 703,275.13 70°17'29.962 N 148°21'15.11 W 11,890.26 48.82 274.01 8,626.49 6,190.36 -3,714.18 5,958,984.27 703,251.60 70°17'29.988 N 148°21'15.79 W 11,921.99 49.09 268.66 8,647.33 6,190.92 -3,738.09 5,958,984.16 703,227.68 70°17'29.994 N 148°21'16.49 W 11,949.58 50.45 261.81 8,665.16 6,189.16 -3,759.05 5,958,981.83 703,206.78 70°17'29.976 N 148°21'17.10 W 11,980.80 53.67 258.77 8,684.36 6,184.99 -3,783.31 5,958,977.00 703,182.64 70°17'29.935 N 148°21'17.81 W 12,009.62 56.38 255.81 8,700.88 6,179.79 -3,806.34 5,958,971.16 703,159.77 70°17'29.884 N 148°21'18.48 W 12,040.09 59.56 253.67 8,717.04 6,172.98 -3,831.25 5,958,963.67 703,135.05 70°17'29.817 N 148°21'19.20 W 12,069.46 63.84 252.89 8,730.96 6,165.54 -3,856.01 5,958,955.55 703,110.51 70°17'29.743 N 148°21'19.93 W 12,099.77 68.23 250.95 8,743.27 6,156.94 -3,882.33 5,958,946.23 703,084.44 70°17'29.659 N 148°21'20.69 W 12,129.68 72.08 250.29 8,753.42 6,147.60 -3,908.86 5,958,936.17 703,058.17 70°17'29.567 N 148°21'21.47 W 12,161.62 76.11 247.64 8,762.18 6,136.57 -3,937.52 5,958,924.36 703,029.83 70°17'29.458 N 148°21'22.30 W 12,189.56 80.08 245.35 8,767.94 6,125.67 -3,962.58 5,958,912.77 703,005.08 70°17'29.351 N 148°21'23.03 W 12,221.42 82.58 242.82 8,772.74 6,111.90 -3,990.91 5,958,898.23 702,977.15 70°17'29.215 N 148°21'23.86 W 12,253.08 84.89 239.80 8,776.20 6,096.80 -4,018.51 5,958,882.37 702,949.97 70°17'29.066 N 148°21'24.66 W 12,279.58 85.02 236.41 8,778.53 6,082.85 -4,040.92 5,958,867.81 702,927.96 70°17'28.929 N 148°21'25.31 W 12,309.90 86.19 232.79 8,780.85 6,065.34 -4,065.55 5,958,849.63 702,903.81 70°17'28.757 N 148°21'26.03 W 12,340.22 86.56 234.42 8,782.77 6,047.39 -4,089.91 5,958,831.01 702,879.96 70°17'28.580 N 148°21'26.74 W 12,370.79 89.05 238.78 8,783.94 6,030.58 -4,115.41 5,958,813.51 702,854.94 70°17'28.415 N 148°21'27.48 W 12,400.44 90.15 242.86 8,784.15 6,016.13 -4,141.29 5,958,798.35 702,829.47 70°17'28.272 N 148°21'28.24 W 12,431.62 88.22 243.49 8,784.59 6,002.06 -4,169.11 5,958,783.52 702,802.05 70°17'28.134 N 148°21'29.05 W 12,460.52 85.51 246.15 8,786.17 5,989.78 -4,195.22 5,958,770.53 702,776.29 70°17'28.013 N 148°21'29.81 W 12,490.78 87.30 250.25 8,788.07 5,978.57 -4,223.25 5,958,758.56 702,748.57 70°17'27.903 N 148°21'30.62 W 12,520.90 90.06 253.77 8,788.76 5,969.27 -4,251.88 5,958,748.47 702,720.21 70°17'27.811 N 148°21'31.46 W 12,550.78 91.29 258.34 8,788.41 5,962.08 -4,280.87 5,958,740.48 702,691.43 70°17'27.740 N 148°21'32.30 W 12,580.72 90.86 261.74 8,787.85 5,956.90 -4,310.35 5,958,734.49 702,662.11 70°17'27.689 N 148°21'33.16 W 1/30/2015 9:25:51AM Page 5 COMPASS 5000.1 Build 61 i1 bp Survey Report-Geographic 00.41 Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 11-30-Slot 30 Project: Prudhoe Bay TVD Reference: Kelly Bushing/Rotary Table @ 62.40usft(NABORS 4E Site: PB DS 11 MD Reference: Kelly Bushing/Rotary Table @ 62.40usft(NABORS 4E Well: 11-30 North Reference: True Wellbore: 11-30A Survey Calculation Method: Minimum Curvature Design: 11-30A Database: EDM R5K-Alaska PROD-ANCP1 r Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +EI-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 12,609.60 87.48 265.10 8,788.27 5,953.59 -4,339.03 5,958,730.40 702,633.53 70°17'27.656 N 148°21'34.00 W 12,642.10 85.58 266.62 8,790.24 5,951.25 -4,371.38 5,958,727.17 702,601.26 70°17'27.633 N 148°21'34.94 W 12,670.78 89.08 268.68 8,791.57 5,950.07 -4,400.00 5,958,725.21 702,572.68 70°17'27.621 N 148°21'35.77 W 12,701.06 89.66 273.55 8,791.90 5,950.66 -4,430.26 5,958,724.96 702,542.42 70°17'27.627 N 148°21'36.66 W 12,732.66 92.31 277.97 8,791.36 5,953.83 -4,461.69 5,958,727.26 702,510.92 70°17'27.658 N 148°21'37.57 W 12,760.92 92.64 281.83 8,790.14 5,958.69 -4,489.50 5,958,731.35 702,482.99 70°17'27.706 N 148°21'38.38 W 12,797.93 91.32 287.20 8,788.86 5,967.95 -4,525.29 5,958,739.63 702,446.95 70°17'27.796 N 148°21'39.43 W 12,820.85 90.52 286.53 8,788.49 5,974.60 -4,547.22 5,958,745.67 702,424.85 70°17'27.862 N 148°21'40.06 W 12,850.76 89.63 282.90 8,788.45 5,982.20 -4,576.15 5,958,752.47 702,395.73 70°17'27.936 N 148°21'40.91 W 12,880.84 90.15 279.77 8,788.51 5,988.11 -4,605.64 5,958,757.56 702,366.09 70°17'27.994 N 148°21'41.77 W 12,911.02 89.51 277.53 8,788.60 5,992.65 -4,635.47 5,958,761.28 702,336.14 70°17'28.039 N 148°21'42.64 W 12,940.68 88.86 275.02 8,789.02 5,995.89 -4,664.95 5,958,763.71 702,306.59 70°17'28.070 N 148°21'43.50 W 12,970.72 90.12 273.88 8,789.29 5,998.22 -4,694.89 5,958,765.21 702,276.59 70°17'28.093 N 148°21'44.37 W 13,000.04 87.88 271.82 8,789.80 5,999.68 -4,724.17 5,958,765.86 702,247.29 70°17'28.107 N 148°21'45.22 W 13,030.70 87.51 269.05 8,791.04 5,999.91 -4,754.80 5,958,765.25 702,216.66 70°17'28.109 N 148°21'46.11 W 13,060.71 88.13 271.95 8,792.18 6,000.17 -4,784.79 5,958,764.69 702,186.69 70°17'28.112 N 148°21'46.99 W 13,091.04 89.51 275.99 8,792.80 6,002.27 -4,815.03 5,958,765.96 702,156.40 70°17'28.132 N 148°21'47.87 W 13,121.04 89.66 281.62 8,793.02 6,006.86 -4,844.66 5,958,769.73 702,126.65 70°17'28.177 N 148°21'48.73 W 13,151.18 89.08 287.06 8,793.35 6,014.32 -4,873.85 5,958,776.38 702,097.27 70°17'28.250 N 148°21'49.58 W 13,181.78 89.94 288.85 8,793.61 6,023.76 -4,902.96 5,958,785.01 702,067.91 70°17'28.343 N 148°21'50.43 W 13,210.00 91.11 293.36 8,793.35 6,033.91 -4,929.28 5,958,794.44 702,041.33 70°17'28.443 N 148°21'51.20 W 13,240.98 90.25 296.96 8,792.99 6,047.08 -4,957.31 5,958,806.83 702,012.94 70°17'28.572 N 148°21'52.02 W 13,270.60 93.38 299.11 8,792.05 6,060.99 -4,983.44 5,958,820.02 701,986.44 70°17'28.709 N 148°21'52.78 W 13,300.76 91.44 302.30 8,790.78 6,076.38 -5,009.34 5,958,834.68 701,960.13 70°17'28.860 N 148°21'53.53 W 13,330.75 92.98 306.19 8,789.62 6,093.24 -5,034.11 5,958,850.85 701,934.91 70°17'29.025 N 148°21'54.25 W 13,360.73 92.43 310.12 8,788.21 6,111.73 -5,057.65 5,958,868.69 701,910.87 70°17'29.207 N 148°21'54.94 W 13,390.76 92.52 314.49 8,786.91 6,131.92 -5,079.84 5,958,888.26 701,888.14 70°17'29.406 N 148°21'55.59 W 13,420.72 93.01 319.14 8,785.46 6,153.74 -5,100.31 5,958,909.50 701,867.07 70°17'29.620 N 148°21'56.19 W 13,452.89 92.49 322.38 8,783.92 6,178.62 -5,120.63 5,958,933.82 701,846.07 70°17'29.865 N 148°21'56.78 W 13,483.66 92.64 321.16 8,782.54 6,202.77 -5,139.65 5,958,957.43 701,826.39 70°17'30.102 N 148°21'57.33 W 13,510.74 90.92 317.44 8,781.70 6,223.28 -5,157.30 5,958,977.45 701,808.19 70°17'30.304 N 148°21'57.85 W 13,541.32 92.21 313.51 8,780.87 6,245.07 -5,178.73 5,958,998.64 701,786.17 70°17'30.518 N 148°21'58.47 W 13,570.83 91.97 311.27 8,779.79 6,264.95 -5,200.51 5,959,017.91 701,763.85 70°17'30.713 N 148°21'59.11 W 13,600.69 90.40 308.86 8,779.17 6,284.17 -5,223.36 5,959,036.49 701,740.49 70°17'30.902 N 148°21'59.77 W 13,631.10 91.51 306.40 8,778.67 6,302.73 -5,247.43 5,959,054.38 701,715.91 70°17'31.084 N 148°22'0.48 W 13,661.34 91.51 304.02 8,777.87 6,320.16 -5,272.13 5,959,071.12 701,690.74 70°17'31.256 N 148°22'1.20 W 13,690.86 91.81 301.38 8,777.01 6,336.10 -5,296.96 5,959,086.37 701,665.48 70°17'31.412 N 148°22'1.92 W 13,720.31 91.69 297.58 8,776.11 6,350.58 -5,322.58 5,959,100.14 701,639.48 70°17'31.554 N 148°22'2.67 W 13,750.77 94.09 295.69 8,774.58 6,364.22 -5,349.77 5,959,113.03 701,611.92 70°17'31.688 N 148°22'3.46 W 13,782.21 95.48 293.33 8,771.95 6,377.21 -5,378.27 5,959,125.23 701,583.07 70°17'31.816 N 148°22'4.29 W 13,810.30 95.94 290.39 8,769.16 6,387.62 -5,404.21 5,959,134.92 701,556.86 70°17'31.918 N 148°22'5.05 W 13,840.55 94.49 287.07 8,766.41 6,397.29 -5,432.74 5,959,143.80 701,528.08 70°17'32.013 N 148°22'5.88 W 13,870.06 95.10 283.45 8,763.94 6,405.03 -5,461.10 5,959,150.76 701,499.52 70°17'32.089 N 148°22'6.70 W 13,900.30 95.07 280.42 8,761.26 6,411.26 -5,490.57 5,959,156.17 701,469.89 70°17'32.150 N 148°22'7.56 W 13,930.29 95.56 277.70 8,758.48 6,415.96 -5,520.05 5,959,160.06 701,440.29 70°17'32.196 N 148°22'8.42 W 13,961.05 95.10 274.30 8,755.62 6,419.16 -5,550.51 5,959,162.42 701,409.76 70°17'32.227 N 148°22'9.31 W 13,991.02 95.29 271.64 8,752.91 6,420.71 -5,580.31 5,959,163.15 701,379.92 70°17'32.242 N 148°22'10.18 W 14,021.14 94.15 271.38 8,750.43 6,421.50 -5,610.32 5,959,163.11 701,349.91 70°17'32.250 N 148°22'11.05 W 14,050.38 92.03 274.20 8,748.85 6,422.92 -5,639.48 5,959,163.73 701,320.72 70°17'32.264 N 148°22'11.90 W 14,080.18 92.33 279.53 8,747.72 6,426.48 -5,669.03 5,959,166.47 701,291.08 70°17'32.298 N 148°22'12.76 W 14,113.12 91.48 282.94 8,746.63 6,432.89 -5,701.32 5,959,171.99 701,258.64 70°17'32.361 N 148°22'13.71 W 14,144.46 93.38 288.26 8,745.30 6,441.31 -5,731.46 5,959,179.58 701,228.27 70°17'32.444 N 148°22'14.58 W 14,170.70 92.64 293.75 8,743.92 6,450.70 -5,755.92 5,959,188.29 701,203.57 70°17'32.536 N 148°22'15.30 W 14,200.79 92.58 298.73 8,742.55 6,463.98 -5,782.87 5,959,200.83 701,176.26 70°17'32.666 N 148°22'16.08 W 14,230.72 93.04 303.60 8,741.08 6,479.45 -5,808.44 5,959,215.58 701,150.28 70°17'32.818 N 148°22'16.83 W 1/30/2015 9:25:51AM Page 6 COMPASS 5000.1 Build 61 0 bp Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 11-30-Slot 30 Project: Prudhoe Bay TVD Reference: Kelly Bushing/Rotary Table @ 62.40usft(NABORS 4E Site: PB DS 11 MD Reference: Kelly Bushing/Rotary Table @ 62.40usft(NABORS 4E Well: 11-30 North Reference: True Wellbore: 11-30A Survey Calculation Method: Minimum Curvature Design: 11-30A Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 14,268.03 93.38 311.15 8,738.99 6,502.04 -5,838.02 5,959,237.35 701,120.09 70°17'33.040 N 148°22'17.69 W 14,291.32 92.06 315.02 8,737.88 6,517.93 -5,855.01 5,959,252.77 701,102.67 70°17'33.196 N 148°22'18.19 W 14,320.54 89.51 319.16 8,737.48 6,539.32 -5,874.90 5,959,273.60 701,082.20 70°17'33.407 N 148°22'18.77 W 14,350.78 89.48 318.44 8,737.75 6,562.08 -5,894.81 5,959,295.80 701,061.67 70°17'33.630 N 148°22'19.35 W 14,380.94 88.99 313.19 8,738.15 6,583.69 -5,915.83 5,959,316.83 701,040.07 70°17'33.843 N 148°22'19.96 W 14,415.62 88.50 311.17 8,738.91 6,606.97 -5,941.52 5,959,339.39 701,013.75 70°17'34.072 N 148°22'20.71 W 14,442.36 88.83 308.14 8,739.53 6,624.03 -5,962.10 5,959,355.87 700,992.71 70°17'34.239 N 148°22'21.31 W 14,467.96 90.61 304.28 8,739.66 6,639.15 -5,982.75 5,959,370.42 700,971.65 70°17'34.388 N 148°22'21.91 W 14,500.64 88.19 300.65 8,740.00 6,656.69 -6,010.31 5,959,387.19 700,943.62 70°17'34.560 N 148°22'22.72 W 14,530.66 85.72 298.34 8,741.59 6,671.45 -6,036.40 5,959,401.22 700,917.13 70°17'34.705 N 148°22'23.48 W 14,570.18 86.77 292.86 8,744.18 6,688.48 -6,071.95 5,959,417.27 700,881.13 70°17'34.872 N 148°22'24.51 W 14,601.32 88.22 291.14 8,745.54 6,700.13 -6,100.79 5,959,428.12 700,851.98 70°17'34.986 N 148°22'25.35 W 14,649.78 88.22 287.74 8,747.05 6,716.25 -6,146.46 5,959,442.98 700,805.88 70°17'35.145 N 148°22'26.68 W 14,676.20 88.71 293.32 8,747.76 6,725.51 -6,171.18 5,959,451.55 700,780.92 70°17'35.236 N 148°22'27.41 W 14,710.30 88.43 296.50 8,748.61 6,739.86 -6,202.10 5,959,465.05 700,749.62 70°17'35.376 N 148°22'28.31 W 14,728.29 88.22 298.32 8,749.14 6,748.14 -6,218.06 5,959,472.88 700,733.44 70°17'35.458 N 148°22'28.77 W 14,763.00 88.22 298.32 8,750.21 6,764.60 -6,248.60 5,959,488.50 700,702.46 70°17'35.619 N 148°22'29.66 W Projection to TD 1/30/2015 9:25:51AM Page 7 COMPASS 5000.1 Build 61 STATE OF ALASKA RECEIVED ALASKIA OIL AND GAS CONSERVATION COIviiAISSION MAR 0 4 2015 WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: • ®Oil El Gas El SPLUG ❑Other 0 Abandoned 0 Suspended 1 b. Well Class 20AAC 25 105 20AAC 25110 0 Exploratory El Stratigraphic 0 GINJ 0 WINJ 0 WAG 0 WDSPL ❑Other No.of Completions One • -® Development El Service 2. Operator Name: 5. Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. ��•2/4/2015 214-174 - 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 • 1/20/2015 50-029-22484-01-00. 4a. Location of Well(Governmental Section): 7. Date T.D. Reached: 0"te 14. Well Name and Number: Surface: l/i9/2015 PBU 11-30A - 1185' FSL, 383' FEL, Sec.28, T11N, R15E, UM - 8. KB(ft above MSL): 62 4' 15. Field/Pool(s) Top of Productive Horizon: 2051' FSL,4281' FEL, Sec. 21,T11N, R15E, UM GL(ft above MSL): 27.2' . Prudhoe Bay/Prudhoe Bay Total Depth: 9. Plug Back Depth(MD+TVD) 2667' FSL, 1337' FEL, Sec. 20,T11N, R15E, UM 14727' • 8749' - 4b. Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD) 16. Property Designation: - Surface: x- 707135 • y- 5952899 - Zone- ASP4 • 14763' • 8750' - ADL 028325, 028322&028321 TPI: x- 703055 y- 5958935 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 700702 y- 5959489 Zone- ASP4 None 18. Directional Survey: ® Yes El No 19.Water depth, if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/-VD: MWD/GR/RES , GR/CCL/RPM • 11512' 8381' 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED See Attached 24. Open to production or injection? ®Yes 0 No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD) of Top&Bottom; Perforation Size and Number): 2"Gun Diameter, 6 spf 4-1/2", 12.6#, 13Cr85 11030' 10471'/7814' Fa-rigs, I /rel 26 ACID, FRACTURE,CEMENT SQUEEZE, ETC. 12860'- 13200' 8789'-8794' 12430'-12690' 8785'-8792' _ WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ® No - � 13270'- 13745' 8792'-8775' � .�•:-, DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 14215'- 14280' 8742'-8738' 14330'- 14615' 8738'-8746' 2500' Freeze Protect w/40 Bbls Diesel 27. PRODUCTION TEST Date First Production Method of Operation(Flowing, Gas Lift,etc Not on Production N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 4 28. CORE DATA Conventional Core(s)Acquired? ❑Yes ®No Sidewall Core(s)Acquired? El Yes ® No . If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions,core chips, photographs and laboratory analytical results per 20 AAC 250.071. None Form 10-407 Revised 10/2012 CONTINUED ON REVERSE Submit Original Only IIT 5/g!!5 -, 7,---RBDM APR - 9 2015 f -g (c 29. GEOLOGIC MARKERS(List all formations and m-•kers encounter 30. FORMATION TESTS NAME TVD Well Tested? es ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. CGL-Zone 3 11512' 8381' None Base of CGL-Zone 2C 11651' 8465' 23SB-Zone 2B 11747' 8530' 22TS 11863' 8608' 21TS-Zone 2A 11963' 8674' Zone 1B 12031' 8712' TDF-Zone lA 12133' 8754' Formation at Total Depth: Zone 1A 12133' 8754' 31.List of Attachment Summary of Daily Drilling Reports,Well Schematic Diagram, Surveys,Cement Report 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Zach Brownin 564-4220 Email: Zachary.Browning@bp.com Printed Name: Joe Lastufk Title: Drilling Technologist Signature' \ I\ `� Phone 5644091 Date: 5/4115 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8. The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool Item 24. If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28. Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only ihEE= WRLIFAD . 11 -30A DOG I a 1""CHROME@TBG&LNR MAX ACTUATOR= BAKER OKB.BE/= 62.4' f BF.ELEy= f , , 2224' H4-1/2"HES X NP,D=3.813" KOP= 1253' 20"CONDUCTOR - 113' 91.5#,1+40 Max Angle= 93°@ 13333' lk GAS LFT MANDRELS •Datum Ivo= NA D=19.124" ST MD TVD DEV TYPE VLV LATCH PORT DATE Datum TVD= 8800'SS 5 3953 3702 r 41 KBG-2 DAY BK 0 01/14/15 9-5/8"CSG STUB/TOC(12/30/14) H -2466' 4 6976 5674 r 51 KBG-2 DMY BK 0 01/09/15 3 8836 6894 r 49 KBG-2 DMY BK 0 01/12/15 9-5/8"DAMAGED CSG(12/27/14)1i-3260'---3342' A 11 2 9703 7411 r57 KBG 2 DMY BK 0 01/12/15 113-3/8"CSG,68#,NT-80 BTC,D= 12.415" -I 3982' 1 10362 7757 r 58 KBG-2 DMY BK 0 01/12/15 TOC(01/08/15) - 4500' * E.~ ' '74 , R4 I 10440' H4-1/2"FES X NP,D=3.813" Minimum ID = 2.377" 11486' 3-1/2" X 2-7/8" XO yg 10471'/-17"x 4-1/2"HES TNT PKI,D=3.856" ' , F 10508' --I4-112"FES X NP,D=3.813" �i SEALBORE SUB,D=3.810" H 10732' ( I � 10618' -I4-112"HES XD SLD SLV,D=3.813(OPEN 1/09/15) TOP OF 3-1/2"X 2-7/8"LNR - 10924' ® i ®®® FF14 10845' -14-1/2"HES XD SLD SLV,D=3.813(OPEN 1109115) SEALBORE SUB,D=3.810" -1 10959' w/iiLTP ACROSS SBS,ID=2.972"(01/31/15) N.:41�►"' 10923' 13.70"BKR DEPLOY SLV,D=3.00" 4-1/2" 4`b . 10944' 3-1/2"HES X NP,13=2.812" 4-1/2"TBG,12.6#,13CR-85 VAM TOP, 11030' L0152 bpf,D=3.958" (BTM 10'PERFORATED) is 9-5/8"X 7"HF�E ZXPN LTP H 11045' \ w/FLEXLOCK HGR,D=6.210 11030' -1--I4-1/2"1NLEG,D=3.958" 7"SCAB LNR,26#,L-80 VAM TOP HC, H 11055' , i .0383 bpf,D=6.276" r, y --moi 11168' H9-5/8"X 4-1/2"UNIQUE OVERSHOT TOP OF CEMENT(02/01/15) - 11067' i 11182' --14-1/2"HES X NP,D=3.813" 4-1/2"TBG STUB(01/03/15) H 11148' X ? !'H 11203'1-19-5/8"X 4-1/2"BKR S-3 FKR,D=3.875" 9-5/8"X 7"TRK,TNV LW &LNR I$GR,D=? -I 11232' 11228' H4-1/2"HES X NP,0=3.813^ BEHIND 4-1/2"TBG,12.6#,13CR-80 VAM ACE, -I 11249' I- I'''', ^, �y 11253' -17"X 4-1/2"UNIQUE OVERSHOT LINER .0152 bpf,D=3.958' , 11276' H7"X 4-1/2"BKR SABL-3 PKR,0=3.94" 4-1/2"TBG STUB(06/18/03) -I 11248' } _-----1 11310' -14-112"HES X NP,D=3.813" 4-1/2"TBG,12.6#,L-80 IDS,.0152 bpi,ID=3.958" H 11322' ► t------1& BEHIND I . .v .` , l 11322' H4-1/2"VVLEG,D=3.958' 9-5/8"CSG,47#,NT-80S NSCC,D=8.681" H 11393' F_ .11; LINER yLOGGED 11336' H ELM)IT 12/16/94 7'LNR,29#,NT-80 NSCC,.0371 bpf,D=6.181" - 11415' 3-1/2"LNR,9.3#,13CR-85 STL, 11486' 4< 11486' 3-1/2"X 2-7/8"XO,D=2.377" .0087 bpf,D=2.992" *ltd 7"X 4-1/2"TT WHIPSTOCK w/RA TAG @--11513' - 11513' i!.*.... ML.LOUT WINDOW(11-30A)115124- 11520' 7"LNR,26#,NT-80 NSCC,.0383 bpf,0=6.276" -I -11513' V • ► . TOP OF CEMENT(09/23/14) -1 11605' 'ti.' y..�_ 12800' -12-7/8"RA PUP JT PERFORATIONSUMu1ARY +♦ 1472T H PBTD REF LOG:BKR RPM ON 02/02/15 ANGLE AT TOP PE RF:88°@ 12430' .114. Note:Refer to Production DB for historical perf data 401$0110101110*"10 SIZE SPF INTERVAL Opn/Sgz SHOT SOZ 2-7/8^LNR,6.5#,13CR-85 STL, -I 14763' SEE PG 2 FOR PERFORATION DEALS I 1 I I I .0058 bpf,D=2.441" DATE REV BY COMMENTS DATE RE/BY COMMENTS PRUDHOE BAY UNIT 06/16/94 1428E INITIAL COMPLETION 02/06/15 JM) DRLG HO CORRECTIONS WELL: 11-30A 06(26/03 N4ES RWO 02/10/15 ZB/JM) CORRECTED CMT DEPTH PERMT No:'2141740 01/13/15 D-16 RWO 02/11/15 ZB/JtvE) RECONFIGURED SCHEMATIC AR No. 50-029-22484-01 02/04/15 NORDIC1 CTD(11-30A) 02/11/15 ZB/JMD FINAL ODE APPROVAL SEC28,T11N,R15E,1185'FSL&383'Fa 01/21/15 CK/JM) RVUD DEPTHS SHF I t1)PER TALLE 02/12/15 PJC ADD CONDUCTOR IPFORMATON 01/21/15 ZB/JM) CTD DEPTH CORRECTIONS 02/26/15 NS/JM) CORRECTED LNR DEPTHS BP Exploration(Alaska) 4 , ' 11 -30A II r A 'A 4 t C4 4.'A .4 4. j. 4 .;44 .. 1 1 4. C. * 1 1 , 44. i ';4, IIIIII jI t i il . ' � : . ; PERFORATION SUMM4RY l,4Y C REF LOG:BKR RPM ON 02/02/15 ), 4< ANGLE AT TOP PERF:88°@ 12430' *y t�+ Note:Refer to Ikoduction DB for historical perf data SIZE SPF INTERVAL Opn/Sqz SHOT SOZ ,+ 2" ' 6 12430-12690 0 02/03/15 4.4. .v. * _'.�. 2" 6 12860- 13200 0 02/03/15 • Y M.Y . 2' 6 13270-13745 0 02/03/15 t.. 2" 6 14215-14280 O 02/03/15 2" 6 14330-14615 O 02/03/15 *At ♦'.4 DATE REV BY COMMENTS DATE REV BY COMMB'fTS PRUDHOE BAY UNIT 06/16/94 N28E INTIAL COMPLETION 02/06/15 JMD DRLG 1-0 CORRECTIONS WELL 11-30A 06/26/03 N4ES RWO 02/10/15 ZB/JMD CORRECTED CMT DEPTH PERMIT ND:' 141740 01/13/15 D-16 RANO 02/11/15 ZB/JMD RECONFIGURED SCHEMATIC AR No: 50-029-22484-01 02/04/15 NORDIC1 CTD(11-30A) 02/11/15 ZB/JMD FINAL ODE APPROVAL SEC 28,T11 N,R15E, 1185'FSL 8 383'FEL 01/21/15 CK/JMD RWO DEPTHS Shy'Ia)PER TALLES 02/12/15 PJC ADD CONDUCTOR INFORMATION 01/21/15 ZB/JMD CID DEPTH CORRECTIONS 02/26/15 NS/JMD CORRECTED LN2 DEPTHS BP Exploration(Alaska) WELL NAME: 11-30A 23. Attachment-Casing, Liner and Cementing Record Casing Setting Depth MD Setting Depth TVD Hole Size Wt. Per Ft. Grade Top Bottom Top Bottom Size Cementing Record 20" 91.5# H-40 36' 114' 36' 114' 30" 260 sx Arctic Set(Approx.) 13-3/8" 68# NT-80 35' 3982' 35' 3723' 16" 1561 sx CS III, 375 sx Class'G' 9-5/8" 47# NT-80S 2465' 11393' 2420' 8317' 12-1/4" 775 sx Class'G' 7" 26# L-80 32' 11168' 32' 8192' Scab 825 sx Class'G' 4-1/2" 12.6# L-80/13CR80 11148' 11322' 8181' 8278' Scab Uncemented 7" 29#/26# NT-80 11232' 11512' 8228' 8785' 8-1/2" 285 sx Class'G' 3-1/2"x 2-7/8" 9.3#/6.5# 13Cr85 10924' 14763' 8058' 8750' 4-1/4" 254 sx Class'G' North America-ALASKA-BP Page 1 of 26 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date:1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor.NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 1/16/2015 12:00 - 13:00 1.00 MOB P PRE FINISH RIG MOVE PREPARATIONS -HOLD PJSM FOR RIG MOVE -PULL OFF WELL; SWAB/SSV/MASTER/ IA/OA CLOSED 13:00 - 18:00 5.00 MOB P PRE MOVE RIG. • 18:00 - 19:00 1.00 MOB P PRE CREW CHANGE .-HOLD PJSM FOR RIG MOVE -DRILLER&TOOL PUSHER CONDUCT ROUTE ASSESSMENT 19:00 - 00:00 5.00 MOB P PRE CONTINUE RIG MOVE TO 11 -NOTIFICATION SENT TO AOGCC FOR REQUEST TO WITNESS BOP TEST AT MIDNIGHT 1/17/2015 00:00 - 06:00 6.00 MOB P PRE CONTINUE RIG MOVE TO DS 11 06:00 - 07:30 1.50 MOB P PRE MOVE PAST FS 2 TO DS 11. STAGE RIG AT EDGE OF PAD. -AOGCC REP WAIVES WITNESS TO BOP TEST AT 0630 HRS 07:30 - 08:30 1.00 MOB P PRE LAY IN T-MATS AT WELL,INSPECT WELL GAUGES AND VALVE ALIGNMENT. NO PRESSURE ON IA,OA. PJSM FOR MOVING OVER WELL. TEST ESD. PULL RIG OVER DS 11-30. RIG ACCEPT 0830 HRS. 08:30 - 11:00 2.50 MOB P PRE PREP RIG FOR OPERATIONS -CLOSE IN CELLAR,MAKE SENSOR CONNECTIONS,INSTALL GUARDS AND GROUND STRAP -STAGE SUPPORT EQUIPMENT -CYCLE TREE VALVES,PRESSURE TEST TREE CAP,ND CAP 11:00 - 14:00 3.00 BOPSUR P PRE NU BOP,RECORD STACK MEASUREMENTS. INSTALL"HOT TUB". RIG UP SLING FOR INJECTOR. TEST ALL AUDIBLE AND VISUAL ALARMS. 1400 - 15:00 1.00 BOPSUR P PRE FLUID PACK STACK,PREPARE EQUIPMENT FOR BOP TEST. 15:00 - 18:30 3.50 BOPSUR P PRE BEGIN BOP TEST. AOGCC REP WAIVED WITNESS. NORDIC FIELD SUPERINTENDENT AND BP WSL ON LOCATION TO WITNESS TEST. FUNCTION ALL RAMS AND ANNULAR FROM CTS REMOTE CONSOLE. -CONDUCT H2S RIG EVACUATION DRILL. CONDUCT AAR TO DISCUSS HAZARDS, REACTIONS OF PERSONNEL ON RIG. 18:30 - 22:45 4.25 BOPSUR P I PRE TEST BOP CREW CHANGE/POST RIG-MOVE WALK AROUNDS AND RIG-UP VERIFICATIONS -HOLD PJSM AND DISCUSS PRESSURE CROSSCHECK WITH ONCOMING CREW -CONTINUE TESTING BOP TO 250 PSI LOW/ 3500 PSI HIGH FOR 5 MINUTES 22:45 - 00:00 1.25 BOPSUR P PRE HOLD PJSM,FILL COIL,STAB ON INJECTOR AND TEST IRV/PACK-OFF TO 250 PSI LOW/ 3500 PSI HIGH FOR 5 MINUTES 1/18/2015 00:00 - 01:30 1.50 BOPSUR P PRE PERFORM SLACK MANAGEMENT,CUT 225' OF COIL. MU COIL CONNECTOR,PT AND PULL TEST CONNECTOR TO 35K. Printed 2/10/2015 9:06:02AM North America-ALASKA-BP Page 2 of 26 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date: 1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Datemme:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 02:00 0.50 BOPSUR P PRE STAB ON INJECTOR,PUMP SLACK FORWARD AND VERIFY TORQUE ON TREE BOLTS. 02:00 - 02:30 0.50 BOPSUR P PRE HOLD H2S/MAN DOWN/RIG EVACUATION DRILL AND AAR. 02:30 - 03:15 0.75 BOPSUR P PRE POP OFF INJECTOR AND HEAD UP BHI. PULL BACK INJECTOR. 03:15 - 04:00 0.75 BOPSUR P PRE PRESSURE TEST BHA CHECK VALVES TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES. 04:00 - 04:45 0.75 DHB P PRE MOBILIZE DSM LUBRICATOR TO RIG FLOOR AND RU TO SLB LUBRICATOR(T'X 9"OTIS CROSSOVER). 04:45 - 05:45 1.00 DHB P PRE HOLD PJSM AND PT DSM LUBRICATOR 250 I PSI LOW/3500 PSI HIGH. PULL TWC ON i FIRST ATTEMPT. OPEN UP TO CLOSED CHOKE AND READ 35 PSI ON TUBING. BLEED OFF,SHUT-IN AND PRESSURE BUILDS BACK TO 35 PSI. - 05:45 - 06:15 0.50 CLEAN P PRE HOLD PJSM FOR BULLHEAD KILL,LINE UP DOWN COIL AND BACKSIDE. 06:15 - 07:45 1.50 CLEAN P PRE BULLHEAD KILL AT4.5 BPM,STARTING WHP 2475 PSI WHILE PUMPING. REACH KILL RATE 'OF 4.5 BPM AT 4 BBLS AWAY AND START KILL VOLUME. PUMPING DOWN COIL AND BACKSIDE. 07:45 - 08:00 0.25 . CLEAN P PRE BULLHEADED 270 BBLS OF 1%KCL AT 4.5 BPM,FINAL CIRCULATING WELLHEAD PRESSURE OF 1975 PSI. OPEN CHOKE AND MONITOR FOR FLOW. WELLHEAD PRESSURE AT ZERO. 08:00 - 08:30 0.50 CLEAN P PRE BEGIN 30 MIN FLOW CHECK,PVT=245 BBLS 08:30 - 08:45 0.25 CLEAN C PRE NO FLOW CONFIRMED,PVT=245 BBLS. HOLD PJSM FOR MAKING UP MILLING/DRIFT BHA. FILL HOLE. 08:45 - 09:45 1.00 CLEAN C WEXIT MU MILL BHA#1 -MILL GAUGE 3.81 GO/3.80 NO-GO,REAMER GAUGE 3.80 GO/3.79 NO-GO -STAB ON INJECTOR AND TEST QTS TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES -WELL LOSING 10 BPH AFTER KILL 09:45 - 12:00 2.25 CLEAN C WEXIT RIH WITH BHA#1 RIH AT 100 FPM -CIRCULATE WITH EDC OPEN AT TAKING RETURNS TO THE PITS -IN/OUT RATE WHILE RIH=3.02/3.37 BPM, PVT=249 BBLS,10 BPH STATIC AND CIRCULATING LOSSES AFTER WELL KILL. LOSSES INCREASED TO 14 BPH DURING RUN IN. _. Printed 2/10/2015 9:06:02AM • North America-ALASKA-BP Page 3 of 26 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date:1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 14:30 2.50 CLEAN C WEXIT RECORD SLOW PUMP RATES. PUW 45K AT 11,050'. SOW WHILE RIH 20K. MOVE DOWN PUMPING AT MIN RATE. NO INDICATION OF OBSTRUCTION OR DEBRIS IN THE AREA OF 11,134'. MOVE PAST EASILY. CONTINUE TO MOVE DOWN WITH NO ISSUES,SLIGHT TAG AT 11,271'. PICK UP,BRING ON PUMPS AND BEGIN CLEANOUT MILLING RUN. -BEGIN MILL OPERATIONS FROM 11,260'AT 2.75 BPM,1560 PSI. CONTACT AT 11,264' WITH INCREASE IN PRESSURE OF 250 PSI. MOTORWORK DOWN TO 11,269'. CLEAN OPERATIONS BELOW 11,270'. -CONTINUE TO RUN DOWN AT 2.73 BPM,1560 PSI,WITH SLIGHT BOBBLES IN I MOTORWORK. CLEAR TAG AT 11,334'WITH MOTORWORK INCREASE TO 1990 PSI. CLEAN UP THROUGH 11,336'. NO FURTHER MOTORWORK SEEN ON RUN FROM 11,336' TO BOTTOM TAG OF 11,605'. -LOG TIE-IN WHILE RUNNING TO BOTTOM WITH-8'CORRECTION. ATTEMPT TO TAG CEMENT PLUG AT-11,605'. SEEMS TO BE I MILLING INTO GREEN CEMENT. DOWN ON PUMPS TO MIN RATE,TAKE WEIGHT AT 11,616'. PICK UP ABOVE GREEN CEMENT. -AVERAGE OF 10-12 BPH LOSSES DURING THIS OPERATION;MW IN 8.36 PPG,MW OUT 8.38 PPG 14:30 - 15:15 0.75 CLEAN P WEXIT PICK UP TO 11,560',PUW46K. PARK AT 11,560'AND PUMP REST OF HI-VIS PILL OUT OF COIL IN ATTEMPT TO SETTLE INTO FORMATION TO SLOW LOSSES. CIRCULATE AT.65 BPM,350 PSI,MW IN 8.33 PPG,MW OUT 8.38 PPG. -FLOW CHECK OFF BOTTOM WITH PILL OUT OF COIL. NO FLOW. 15:15 - 15:45 0.50 CLEAN P WEXIT PICKUP HOLE AT MIN RATE TO DRIFT TUBING. DRIFT FROM 11,560'TO 10,390',NO ISSUES ON UP PASS. -MW IN 8.32 PPG,MW OUT 8.38 PPG. LOSS RATE HAS SLOWED TO-6 BPH. 15:45 - 16:30 0.75 CLEAN P WEXIT LOG CCL FROM 10,400'TO 11,605'WHILE CONDUCTING DRY DRIFT DOWN TO CEMENT PLUG. DRY DRIFT GOOD UP TO 11,131'. STOP LOGGING CCL,PU AND CLEAN UP AREA. Printed 2/10/2015 9:06:02AM North America-ALASKA-BP Page 4 of 26 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date:1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:30 - 18:15 1.75 CLEAN P WEXIT BRING PUMPS UP TO 2.7 BPM,1780 PSI. BEGIN DOWN PASS WITH 15K SOW. LOSSES PICKED UP AGAIN WITH INCREASED PUMP RATE. -MILL DOWN FROM 11,120'. MOTORWORK INCREASED 90 PSI AT 11,129'BUT NOT TAKING ANY WEIGHT. INCREASED TO 230 PSI AT 11,131'. DROP DOWN TO FREE SPIN BUT PICKED BACK UP. MOTORWORK RANGING FROM 50-90 PSI. PICK UP FROM 11,135'AND MAKE SECOND PASS. SIMILAR MOTORWORK WHILE WORKING THROUGH 11,128'TO 11,135'. PICK UP TO 11,125'AND MAKE THIRD PASS DOWN WITH SIMILAR MOTORWORK. MAKE FOURTH PASS AT A MUCH SLOWER RATE WITH 40-100 PSI MOTORWORK. PICKUPS AFTER THIRD AND FOURTH PASSES CLEAN,PUW 45K. DRY DRIFT THROUGH 11,125'TO 11,135'AND IT LOOKS GOOD. -MW IN 8.36 PPG,MW OUT 8.39 PPG, LOSSES AT 6 BPH 18:15 - 21:00 2.75 CLEAN P WEXIT BEGIN LOGGING CCL DOWN FROM CURRENT DEPTH OF 11,135'. ENCOUNTER MOTORWORK AGAIN AT 11,259'(SAME AREA OF CLEANUP EARLIER IN OPERATION). 80 PSI OF MOTORWORK FROM 11,259'TO 11,265'. PU AND MAKE CLEAN PASS DOWN '50'PAST PLANNED WHIPSTOCK SETTING DEPTH(11,550'). PU TO 11,250',MAINTAIN PUMP RATE FOR BU,AND CONTINUE CCL FROM 11,240'TO 11,600'. 21:00 - 22:15 1.25 CLEAN P WEXIT CCL UNABLE TO CAPTURE 7"COUPLING DATA. PU AND RE-ATTEMPT AT SLOWER TRIP SPEED AND REDUCED PUMP RATE WITH NO SUCCESS. POH FOR WHIPSTOCK ASSEMBLY AND ALTERNATE MWD TOOL. 22:15 - 00:00 1.75 CLEAN P WEXIT POH WITH CLEANOUT/MILLING BHA#1 -FLOW CHECK;NO FLOW -POH AT 100 FPM IN/OUT RATE=3.2/2.6 BPM 1/19/2015 00:00 - 01:45 1.75 CLEAN C WEXIT LD CLEANOUT/MILL BHA(BHA#1) -HOLD PJSM FOR LD BHA -LD MILL,REAMER AND MOTOR(UNABLE TO BREAK MILL) -REAMER GAUGE:3.75 GO/3.74 NO-GO -MU WHIPSTOCK BHA(BHA#2) -STAB ON INJECTOR AND PRESSURE TEST QTS TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES 01:45 - 05:00 3.25 STWHIP C WEXIT RIH WITH WHIPSTOCKBHA(BHA#2) -OPEN EDC AND RIH AT 80 FPM -IN/OUT RATE WHILE RIH=1.4/1.8 BBLS, PVT START=145 BBLS -MW IN 8.33 PPG,MW OUT 8.39 PPG, LOSSES AT 4 BPH -WT CHECK AT 11,100'=48K,RIH WT=17K -TIE IN TO PDC LOG WITH-7 CORRECTION ON GR Printed 2/10/2015 9:06:02AM North America-ALASKA-BP Page 5 of 26 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date:1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:00 - 06:30 1.50 STWHIP C WEXIT RE-LOG CCL PASS FROM 11,000'TO 11,600'AT • 15 FPM. DATA FROM CCL INCONCLUSIVE ON COLLAR LOCATION. CORRELATE 7"CASING SUMMARY FROM ORIGINAL SUMMARY OF • CASING RUN IN 1994 TO GEO PDC LOG TO ENSURE GOOD SET POINT. 06:30 - 07:00 0.50 STWHIP C WEXIT PICK UP TO POSITION WHIPSTOCK PICK UP WEIGHT 48K,SOW 21K. POSITION TOP OF WHIPSTOCK AT 11,500'. BRING ON PUMPS TO .40 BPM,POSITIVE INDICATION OF SHEAR AT 2900 PSI. PICK UP,SET DOWN 5K TO CONFIRM SET. SET DOWN LOWER THAN EXPECTED BUT WHIPSTOCK DID TAKE 6K DOWN WEIGHT. 07:00 - 08:45 1.75 STWHIP C WEXIT PICK UP WITH SLIGHT OVERPULL AND INCREASE IN RETURN WEIGHT TO INDICATE RUNNING TOOL IS CLEAR OF WHIPSTOCK. PUW 48K. PARK ABOVE WHIPSTOCK AND BEGIN DISPLACEMENT TO 9.5 PPG POWERPRO MUD SYSTEM. MW BEFORE DISPLACEMENT:MW IN 8.32 PPG,MW OUT 8.39 PPG,LOSS RATE OF-3 ,BPH 08:45 - 09:15 0.50 STWHIP C WEXIT WELL AND COIL DISPLACED TO 9.5 PPG MUD. PERFORM FLOW CHECK 09:15 - 11:15 2.00 STWHIP C WEXIT COMPLETE MUD SWAP IN PITS. POH AT 100 FPM. STARTING PVT 100 BBLS. MW IN/OUT =9.41/9.50 PPG 11:15 - 11:30 0.25 STWHIP C WEXIT FLOW CHECK. HOLD PJSM FOR LAYING DOWN BHA#2,AND PICKING UP BHA#3. PVT FINAL=40 BBLS 11:30 - 12:00 0.50 STWHIP C WEXIT LAY DOWN BHA#2 12:00 - 13:00 1.00 STMILL P • WEXIT MAKE UP BHA#3,WINDOW MILLING ASSEMBLY. STAB ON,PRESSURE TEST QUICK TEST SUB. 13:00 - 15:30 2.50 STMILL P WEXIT RIH WITH MILLING BHA. MW IN 9.35 PPG,MW OUT 9.50 PPG,3-4 BPH • LOSSES DURING TRIP IN. 15:30 - 16:00 0.50 STMILL P WEXIT DOWN ON PUMPS. MOVE DOWN TO ENGAGE WHIPSTOCK TRAY. MOVE DOWN TO 11,495',CORRECT-4'TO DEPTH OF 11,491'. SOW OF 18.5K. ENGAGE PINCH POINT OF TRAY. TAKE WEIGHT AT 11,513' CORRECTED DEPTH;PINCH POINT 4.6' DOWN MAKES CALCULATED TOP OF WHIPSTOCK AT 11,508.4'.PICK UP WITH BREAKOVER AT 47K. -RECORD SLOW PUMP RATES 16:00 - 18:00 2.00 STMILL P WEXIT BEGIN MILLING FROM 11,512'AT 1 FPH. FREE SPIN OF 2350 PSI AT 2.60 BPM -MW IN 9.45 PPG,MW OUT 9.46 PPG -IN/OUT RATE WHILE MILLING=2.6/2.6 BPM -LOSSES HAVE SLOWED TO LESS THAN 1 BPH WHILE MILLING -SET DOWN-1.7 K WOB/150-200 PSI DIFFERENTIALAND CONTROL ROP FOR 1/10' /6 MINUTE MILL OFF Printed 2/10/2015 9:06:02AM North America-ALASKA-BP Page 6 of 26 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date:1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 20:00 2.00 STMILL P WEXIT CONTINUE MILLING FROM 11,513'AT 1 FPH. FREE SPIN OF 2350 PSI AT 2.60 BPM -MW IN 9.45 PPG,MW OUT 9.46 PPG -IN/OUT RATE WHILE MILLING=2.6/2.6 BPM -LOSS RATE-1 BPH -SET DOWN-1.7 K WOB/200 PSI •DIFFERENTIAL AND CONTROL ROP FOR 1/10' /6 MINUTE MILL OFF 20:00 - 22:00 2.00 STMILL P WEXIT CONTINUE MILLING FROM 11,515'AT 1 FPH. FREE SPIN OF 2350 PSI AT 2.60 BPM MW IN 9.44 PPG,MW OUT 9.45 PPG -IN/OUT RATE WHILE MILLING=2.6/2.6 BPM -LOSS RATE-1 BPH -SET DOWN-2.4 K WOB/250-300 PSI DIFFERENTIAL AND CONTROL ROP FOR 1/10' /6 MINUTE MILL OFF 22:00 - 00:00 2.00 STMILL P WEXIT CONTINUE MILLING FROM 11,517'AT 1 FPI-I. FREE SPIN OF 2350 PSI AT 2.60 BPM MW IN 9.44 PPG,MW OUT 9.45 PPG IN/OUT RATE WHILE MILLING=2.6/2.6 ,BPM LOSS RATE-1 BPH -SET DOWN-2.4 K WOB/300 PSI DIFFERENTIAL AND CONTROL ROP FOR 1/10' /6 MINUTE MILL OFF 1/20/2015 00:00 - 01:45 1.75 STMILL P WEXIT CONTINUE MILLING FROM 11,517'AT 1 FPH. FREE SPIN OF 2350 PSI AT 2.60 BPM -MW IN 9.44 PPG,MW OUT 9.45 PPG -IN/OUT RATE WHILE MILLING=2.6/2.6 BPM -LOSS RATE MAINTAINING-1 BPH -SET DOWN-2.4 K WOB/300 PSI DIFFERENTIAL -BOTTOM OF WINDOW AT 11,520';CONTROL MILL TO 11,521'AND ALLOW REAMER TO CLEAN BOTTOM OF WINDOW;INCREASE ROP-5 FPH IN NEW FORMATION 01 45 - 03:15 1.50 STMILL P WEXIT MILL RATHOLE -MW IN 9.44 PPG,MW OUT 9.44 PPG IN/OUT RATE WHILE MILLING=2.6/2.6 BPM -LOSS RATE MAINTAINING 1 BPH -MILL RATHOLE AT 5 FPH,2-3 K WOB,350 PSI DIFFERENTIAL TAKE SAMPLES FROM 11,520'AND 11,525' 03.15 - 06:30 3.25 STMILL P WEXIT CONTINUE MILLING RATHOLE TO 11,530' -MW IN 9.44 PPG,MW OUT 9.44 PPG -IN/OUT RATE WHILE MILLING=2.6/2.6 BPM -LOSS RATE MAINTAINING 1 BPH -MILL RATHOLE AT 2 FPH;4 K WOB AND 450 PSI DIFFERENTIAL 06:30 - 08:45 2.25 STMILL P WEXIT CONDUCT REAM PASSES AND ALL LOOKS GOOD. DRY DRIFT AND WINDOW LOOKS GOOD. FLOW CHECK WELL,NO FLOW. PUMP DOWN HI-VIS PILL TO BOTTOM TO CLEAN UP RATHOLE,GET AROUND AND BEGIN SAMPLE UP HOLE. Printed 2/10/2015 9:06:02AM • North America-ALASKA-BP. Page 7 of 26 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 ' End Date:1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:45 - 12:00 3.25 STMILL P WEXIT PULL UP HOLE CHASING HI-VIS PILLAND SAMPLE UP. -MW IN AND OUT 9.40 PPG,FULL RETURNS -PULL TO SURFACE,FLOW CHECK AND ALL GOOD. PJSM ON LAYING DOWN BHA. 12:00 - 13:30 1.50 STMILL P WEXIT POP OFF,STAND INJECTOR TO SIDE. LD BHA AND MOBILIZE BAKER TOOLS OFF OF RIG. MU DRILLING BHA WITH 4.25"BI-CENTER BIT ONTO 2-7/8"EXTREME MOTOR WITH 1.2' BEND AND BHI SMART TOOLS. PRESSURE TEST QUICK TEST SUB. 13:30 - 16:00 2.50 DRILL P PROD1 RIH WITH DRILLING BHA. NO ISSUES PASSING THROUGH TWO PREVIOUS SECTIONS OF CLEANOUT ON INITIAL RUN. LOG TIE-IN WITH-5'CORRECTION. CONTINUE TO MOVE DOWN. RECORD SLOW PUMP RATES. 16:00 - 20:30 4.50 DRILL P PROD1 DRILL AHEAD FROM 11,530'. FREE SPIN OF 2730 PSI AT 2.9 BPM. -2.75-2.90 BPM,3100 PSI,10.6 ECD,1.4 WOB -MW IN 9.42 PPG,MW OUT 9.45 PPG,NO LOSSES TO FORMATION -IA AT 1040 PSI,OA AT 0 PSI 20:30 - 21:30 1.00 DRILL P PROD1 WIPER FROM 11,600'TO 11380' 21:30 - 00:00 2.50 DRILL P PROD1 DRILL BUILD SECTION FROM 11600'TO 11637' FREE SPIN=2555 PSI AT 2.68 BPM RATE IN=2.70 BPM RATE OUT=2.68 BPM MW IN=9.43 PPG MW OUT=9.45 PPG ECD =10.61 PPG ROP=20 FPH WOB=.6 K CIRC PSI= PSI IAP=1090 PSI OAP=0 PSI STALLING OFTEN. 1/21/2015 00:00 - 02:00 2.00 DRILL P PROD1 DRILLING BUILD SECTION 11637'TO 11667' FREE SPIN=2500 PSI AT 2.9 BPM RATE IN=2.94 BPM RATE OUT=2.92 BPM MW IN=9.43 PPG MW OUT=9.45 PPG ECD =10.66 PPG ROP=15 FPH WOB=1.O K CIRC PSI= 2721 PSI IAP=1140 PSI OAP=0 PSI 02:00 - 04:00 2.00 DRILL P PROD1 DRILLING BUILD SECTION 11667'-11706' FREE SPIN=2680 PSI AT 2.88 BPM RATE IN=2.88 BPM RATE OUT=2.88 BPM MW IN=9.42 PPG MW OUT=9.46 PPG ECD =10.67 PPG ROP=20 FPH WOB=2.5 K CIRC PSI= 2805 PSI IAP=1155 PSI OAP=0 PSI 04:00 - 04:30 0.50 DRILL P PROD1 DRILLING BUILD SECTION 11706'TO 11714' FREE SPIN=2680 PSI AT 2.88 BPM RATE IN=2.88 BPM RATE OUT=2.88 BPM MW IN=9.42 PPG MW OUT=9.46 PPG ECD =10.67 PPG ROP=20 FPH WOB=2.5 K CIRC PSI= 2805 PSI IAP=1155 PSI OAP=0 PSI DISCUSSIONS WITH DD. DOG LEGS ARE COMING IN LOW. NOT GONNA MAKE THE TURN INTO POLYGON. WIPER. PERFORM FLOW CHECK GOOD Printed 2/10/2015 9:06:02AM North America-ALASKA-BP Page 8 of 28 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date:1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:30 - 07:15 2.75 DRILL P PROD1 POOH FOR BIT/MOTOR. LOSS OF 1 BBL ON TRIP OUT OF HOLE. FLOW CHECK AT SURFACE,NO FLOW. PJSM ON LAYING DOWN BHA. 07:15 - 08:30 1.25 j DRILL P PROD1 LD BHA. BIT GRADE 3-3-BT. MU HYCALOG BI-CENTER BIT ON EXTREME MOTOR WITH 1.45°BEND. STAB ON,PRESSURE TEST QUICK TEST SUB. 08:30 - 11:15 2.75 DRILL P PROD1 RIH WITH BHA. NO ISSUES RUNNING BY SLIDING SLEEVES AT 10,613'OR 10,840'. 11:15 - 15:00 3.75 DRILL P PROD1 CONDUCT LONG TIE-IN LOG TO PDC LOG FROM 11,300'WITH-6'CORRECTION. CONTINUE TO LOG MAD PASS DOWN TO CURRENT TD OF 11,714 TO CAPTURE RESISTIVITY DATA. RECORD SLOW PUMP RATES. 15:00 - 17:30 2.50 DRILL P PROD1 DRILL AHEAD IN BUILD SECTION. FREE SPIN OF 2380 PSI AT 2.60 BPM. -2.60-2.65 BPM,2480-2870 PSI,1.65-3.6K WOB,ECD STEADY AT 10.6 PPG,ROP 75-95 FPH -CONDUCT BHA WIPER WITH NO DIFFICULTY,PICK UP CLEAN -BHA WIPER WHILE BLEEDING IA FROM 1080 PSI TO 75 PSI. 1/2 BBL OF FLUID PACKED RETURNS,PRIMARILY THERMAL PRESSURE. -MW IN 9.44 PPG,MW OUT 9.48 OUT;INITIAL LOSSES OF-2 BPH SLOWED TO LESS THAN 1 BPH LOSSES AS DRILLING PROGRESSED 17:30 - 18:00 0.50 DRILL I P PROD1 DRILL AHEAD IN BUILD SECTION FROM 11,850'. FREE SPIN OF 2400 PSI AT 2.60 BPM. 2.60-2.65 BPM,2480-2870 PSI,1.65-3.6K WOB, ECD STEADY AT 10.6 PPG,ROP 75-95 FPH CONDUCT BHA WIPER WITH NO DIFFICULTY,PICK UP CLEAN MW IN 9.44 PPG,MW OUT 9.48 OUT;INITIAL 'LOSSES OF-2 BPH SLOWED TO LESS THAN 1 BPH LOSSES AS DRILLING PROGRESSED ROP SLOWED. TALKED WITH GEO. SHOULD BE STARTING INTO 23N 18:00 - 22:30 4.50 DRILL P PROD1 DRILL AHEAD IN BUILD SECTION FROM 11,866'TO 11944. FREE SPIN OF 2400 PSI AT 2.60 BPM. 2.7-2.73 BPM,2480-2970 PSI,5-7K WOB,ECD STEADY AT 10.6 PPG,ROP 30 FPH -MW IN 9.46 PPG,MW OUT 9.47 OUT; 1 BPH LOSSES AS DRILLING PROGRESSED 22:30 - 00:00 1.50 DRILL P PROD1 WIPER UP TO WHIPSTOCK OPEN EDC. WASH THROUGH 7"TO 4-1/2"TUBING TAIL AT 11300' -CLOSE EDC.PERFORM TIE IN+7' CORRECTION -TAG TD AT 12018' Printed 2/10/2015 9:06:02AM North America-ALASKA-BP Page 9 of 26 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date:1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 1/22/2015 00:00 - 02:00 2.00 DRILL P PROD1 CONTINUE TO DRILL AHEAD FROM 12014'TO ,12135' FREE SPIN=2505 PSI AT 2.67 BPM RATE IN=2.60 TO 2.67 BPM RATE OUT= 12.60 TO 2.64 BPM MW IN=9.46 TO 9.47 PPG MW OUT=9.51 TO 9.52 PPG ECD=10.62 TO 10.68 PPG ,ROP=53TO64FPH WOB=2.OTO5K CIRC PSI=2612 TO 2710 PSI • IAP=250 PSI OAP=0 PSI 1.5 BBL/HR SEEPAGE LOSSES 02:00 - 03:00 1.00 DRILL P PROD1 CONTINUE DRILL AHEAD. -START HAVING DIFFICULTY GETTING BIT TO DRILL. I-PERFORM WIPER 03:00 - 06:00 3.00 DRILL P I PROD1 CONTINUE TO DRILL AHEAD FROM 12144'TO 12250' FREE SPIN=2505 PSI AT 2.67 BPM RATE IN=2.71 TO 2.72 BPM RATE OUT= 2.65 BPM MW IN=9.5PPG MW OUT=9.51 TO 9.59 PPG ECD=10.75 TO 10.79 PPG ROP=53 FPH WOB=2.0 TO 5K CIRC PSI= 2612 TO 2710 PSI IAP=345 PSI OAP=0 PSI 06:00 - 07:15 1.25 DRILL P PROD1 DRILL AHEAD FROM 12,250'. FREE SPIN OF 2600 PSI AT 2.70 BPM. 07 15 - 08:45 1.50 DRILL P PROD1 LONG WIPER TRIP UP TO WINDOW. NO ISSUES ON TRIP. LOG TIE-IN WITH RA TAG WITH+8'CORRECTION. RUN BACK DOWN TO CURRENT TD WITH NO ISSUES. RECORD SLOW PUMP RATES. 08,15 - 13:30 4.75 DRILL P PROD1 DRILL AHEAD FROM 12,274'. FREE SPIN 2600 AT 2.70 BPM. 11-2.70-2.85 BPM,2800-3270 PSI,1.5-5.3K WOB, STEADY ECD OF 10.7 PPG,ROP SLOWED FROM 130 FPH DOWN TO 25-30 FPH. -PICK UPS HEAVY AT 7-10K OVER PULL BUT TEND TO BE FAIRLY CLEAN AFTER BREAKOVER. ADDED.5%LUBRICANTS TO ASSIST WITH SLIDING;GAIN ABOUT 5K IN WEIGHT TRANSFER BACK. CUTTINGS ARE CONSISTENT ACROSS SHAKER. -MW IN AND OUT 9.5 PPG,LOSING AN AVERAGE OF 1-2 BPH WHILE DRILLING -APPLYING MORE WOB BUT NOT SEEING CORRESPONDING DIFFERENTIAL PRESSURE INCREASE. MAKE SEVERAL SHORT WIPERS AND ATTEMPT TO VARY WOB,FLOW RATE TO INCREASE DRILLING. FLOW CHECK IN PREPARATION FOR POH. PULL OFF BOTTOM AT 12,373'. Printed 2/10/2015 9:06:02AM North America-ALASKA-BP Page 10 of 26 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date: 1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Datelfime:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:30 - 16:30 3.00 DRILL P PROD1 FLOW CHECK GOOD. POH FOR BHA INSPECTION. PULL TO WINDOW,OPEN EDC AND FLOW CHECK NO FLOW. JET ACROSS WHIPSTOCK TRAY WITH HI-VIS PILL COMING OUT OF BIT AND SLOWLY PULL THROUGH 7" CASING AT 4.5 BPM CHASING HI-VIS PILL OUT. PULL TO 4-1/2"TUBING AND INCREASE PULLING SPEED. LARGE SLUG OF CUTTINGS IN FRONT OF HI-VIS SWEEP ACROSS SHAKER BUT LEVELED OUT TO CONSISTENT RETURNS AS SWEEP WAS COMING ACROSS. NEVER SAW ANY PRESSURE SPIKES OR SLOWING OF RETURNS DURING TRIP OUT. HAD 1-TO-1 RETURNS ON TRIP OUT. 16:30 - 17:00 0.50 DRILL P PROD1 FLOW CHECK AT SURFACE. NO FLOW. PJSM ON LAYING DOWN BHA.-LD BHA. BIT GRADE 17:00 - 20.00 3.00 DRILL P PROD1 I PJSM ON CUTTING COIL. CUT CONNECTOR OFF. CUT 50'OF COIL FOR CHROME MANAGEMENT. RE-HEAD FOR BHI. -PT CTC TO 4000#. -PT BHI DFCV TO LOW/HIGH 20:00 - 20:30 0.50 DRILL P PROD1.. -FUNCTION TEST BOPE 20:30 - 21:30 1.00 DRILL P PROD1 -MAKE UP BHA. "-PT QTS TO LOW/HIGH 21:30 - 00:00 2.50 DRILL P PROD1 -RIH WITH BHA#6 -CURRENTLY LOGGING TIE IN 1/23/2015 00:00 - 00:10 0.17 DRILL P PROD1 FINISH TIE IN. -7'CORRECTION 00:10 - 04:30 4.33 DRILL P PROD1 !SLOW PUMPS TO MIN FROM 11890'10 11960' FOR SHALE DRILL AHEAD FROM 12371'TO 12565 FREE SPIN 3050#AT 3.02 BPM -3.02 BPM,3050-3370 PSI,1.5-2.5K WOB, STEADY ECD OF 10.8 PPG, -MW IN 9.52 PPG MW OUT 9.58 PPG -PERFORMING BHA WIPERS AS NEEDED 04.30 - 06:00 1.50 DRILL P PROD1 DRILLING AHEAD FROM 12565 TO 12620' 3.02 BPM IN 2.8 BPM OUT 3050 TO 3600# CIRC PRESSURE. 1.5 TO 3.5 WOB. STEADY ECD AT 10.8 PPG LOSSES WHILE DRILLING HAVE INCREASED TO AN AVERAGE OF 10-12 BPH 06:00 - 08:00 2.00 DRILL P PROD1 DRILL AHEAD FROM 12,620'. FREE SPIN OF 3060 AT 3.0 BPM. PICKUP FOR BHA WIPER,RECORD SLOW PUMP RATES -CONTINUE DRILLING:3 BPM,3500-3700 PSI, 2.6-4K WOB,ECD 10.85 PPG,90-95 FPH -MW IN 9.55 PPG,MW OUT 9.58 PPG, LOSSES AVERAGING 9 BPH DURING DRILLING. IA AT 380 PSI,OAO PSI. 08:00 - 10:15 2.25 DRILL P PROD1 WIPER TRIP TO WINDOW FROM 12,770'. PICK UP CLEAN AT 43K PULL TO WINDOW WITH NO ISSUES. BRING UP PUMPS AND JET WHIPSTOCK TRAY,CONTINUE TO PUMP AT HIGH RATE THROUGH 7"AND UP TO 4-1/2". SLIGHT INCREASE OF CUTTINGS ACROSS SHAKER. PUMP BOTTOMS UP,MOVE BACK DOWN. LOG TIE-IN WITH+8'CORRECTION. Printed 2/10/2015 9:06:02AM • North America-ALASKA-BP Page 11 of 26 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date:1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:15 - 15:30 5.25 DRILL P PROD1 DRILL AHEAD FROM 12,770'. FREE SPIN 2830 PSI AT 2.85 BPM. -2.85-3.05 BPM,3300-3810 PSI,2.9-3.6K WOB, ECD INCREASED FROM 10.85 PPG TO 10.95 PPG -MW IN AND OUT 9.55 PPG,AVERAGING 6-8 BPH LOSSES. MUD PROPERTIES GOOD BUT STARTING TO SEE A NEGATIVE TREND IN COIL WEIGHT TRANSFER. ADDED ANOTHER .5%OF LUBRICANTS. IA AT 475 PSI,OA 0 PSI. 15:30 - 18:30 3.00 DRILL P PROD1 LONG WIPER TRIP. PICKUP LITTLE STICKY I TO 51K BUT CLEAN AFTER BREAKOVER. PICK UP HOLE FOR WIPER AT 41-43K. PULL INTO WINDOW,OPEN EDC AND CIRC A BOTTOMS UP IN 7"AT MAX RATE. NOT AS MANY CUTTINGS AS PRIOR WIPER BUT CONSISTENT STREAM. LOG LONG TIE-IN WITH+10'CORRECTION. CONTINUE WITH WIPER TRIP DOWN TO CURRENT TD. RECORD SLOW PUMP RATES. LOST 20 BBLS ON COMPLETE WIPER TRIP. 118:30 - 00:00 5.50 DRILL P PROD1 DRILL AHEAD FROM 13,174'. FREE SPIN 2940 PSI AT 2.95 BPM. DRILLING AHEAD. ROP SLOWED AT 12213' HAVING ISSUES SLIDING.MAINTAINING WOB. -PERFORM SHORT WIPERS CURRENTLY DRILLING AHEAD AT 13247' -9.55 PPG IN/9.53 PPG OUT WOB AT 4-6 K ECD HOLDING AT 10.85 PPG 1/24/2015 00:00 02:00 2.00 DRILL P PROD1 DRILL AHEAD HARD DRILLING. GAMMAAPI CLIMBING. DIFFICULTY HOLDING WOB. BHA WIPERS HELPING. -iN/OUT 3.0 BPM/2.94 BPM MW IN 9.54 PPG/ MW OUT 9.53 PPG OUT ECD 10.86 PPG 02:00 - 02:40 0.67 DRILL P PROD1 DRILL AHEAD -AT 13274' ROP INCREASED WITH POSITIVE SURFACE WEIGHT BACK. -DRILL AHEAD AT INCREASED ROP. GAMMA API DROPPING OFF. 02:40 - 04:00 1.33 DRILL P PROD1 DRILL AHEAD FROM 13274'TO 13399' -LOSSES DECREASED TO 4 BPH -PERFORM 400'WIPER 04:00 - 06:00 2.00 DRILL P PROD1 DRILL AHEAD AT 13427' FREE SPIN=3050 PSI AT 3.01 BPM RATE IN=3.01 BPM RATE OUT=2.93 BPM MW IN=9.56 PPG MW OUT=9.58 PPG ECD =10.9 PPG ROP=44 FPH WOB=3 K CIRC PSI=3384 PSI IAP=671 PSI OAP=0 PSI Printed 2/10/2015 9:06:02AM North America-ALASKA-BP Page 12 of 26 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date:1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 10:00 4.00 DRILL P PROD1 -HAVING WEIGHT TRANSFER ISSUES, ERRATIC WEIGHT/RETURN RATE COMING THROUGH SHALE -PERFORM LONG WIPER TO THE WINDOW TO CLEAN UP HOLE AND CLEAN UP LONG TANGENT IN TUBING -TRIP UP WENT WELL. PULL INTO WINDOW, OPEN EDC AND BRING RATE UP TO 4.7 BPM. CLEAN UP THROUGH 7",PUMP BOTTOMS UP AT TUBING TAIL. CONTINUE WITH HIGH RATE WITH CONSISTENT RETURNS ACROSS SHAKER WHILE MOVING BACK DOWN. TUBING IS CLEAN. LOG FORMATION TIE-IN WITH+17'CORRECTION. TIE-IN TO RA TAG WITH+3'CORRECTION. -CONTINUE WITH WIPER TRIP DOWN TO I CURRENT TD OF 13,457'. '-TRUCKING ON LOCATION,PREPARING FOR MUD SWAP 10:00 - 12:30 2.50 DRILL P PROD1 TAG BOTTOM AT CORRECTED DEPTH OF 13,466'. DRILL AHEAD. FREE SPIN ON OLD MUD SYSTEM OF 3000 PSI AT 2.9 BPM. -OLD MUD PARAMETERS:2.90-2.95 BPM, 3400-3765 PSI,2.7-4.1K WOB,ECD 11 PPG, SOW FELL FROM 6.4K DOWN WEIGHT(COIL TRANSFER WEIGHT)TO-5.8K SOW;MW IN 9.55 PPG,MW OUT 9.6 PPG,LOSSES AVERAGED 5-6 BPH -WITH NEW MUD COMING AROUND PRESSURE REDUCED FROM 3000 PSI TO 2830 PSI AT 3.0 BPM WITH NEW MUD OUT OF BIT,PUW REDUCED TO 41K,COIL WEIGHT TRANSFER HAS IMPROVED. -NEW MUD PARAMETERS:2.9-3.0 BPM, 1 31 00-31 80 PSI 12:30 - 15:00 2.50 DRILL N STUC 11,651.00 PROD1 TEMPORARILY DETAINED FROM COIL MOVEMENT. ABLE TO CIRCULATE WITH FULL RETURNS AND CAN MOVE ORIENTER, DIFFERENTIALLY STUCK. FOLLOW THE WELL PLAN CONTINGENCY IN THE DRILLING SECTION FOR GETTING COIL MOVING AGAIN. CIRCULATE BOTTOMS UP AT 3.0 BPM,FULL RETURNS. ATTEMPT TO PULL FREE, CANNOT. MAKE SEVERAL ATTEMPTS AT UP AND DOWN MOVEMENT,CANNOT GET FREE. -PUMP MINERAL OIL DOWN,PLACE OUTSIDE OF COIL,PULL FREE ON FIRST ATTEMPT. CIRCULATE UNTIL MINERAL COMPLETELY OUT OF COIL AND ABOVE BHA WHILE RECIPROCATING. 1500 - 17:30 2.50 DRILL P PROD1 CONDUCT WIPER TRIP TO CIRCULATE MINERAL OIL OUT OF WELLAND CLEAN UP ANY CUTTINGS. PULL TO WINDOW WITH NO ISSUES,42K PUW. PULL INTO WINDOW,LOG TIE-IN TO RA TAG WITH+11'CORRECTION. CONTINUE WITH WIPER TRIP DOWN WITH NO ISSUES. Printed 2/10/2015 9:06:02AM North America-ALASKA-BP Page 13 of 26 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date:1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 21:30 4.00 DRILL P PROD1 TAG BOTTOM ON DEPTH AT 13,651'. FREE SPIN OF 2840 PSI AT 2.95 BPM. FREE SPIN=2840 PSI AT 2.95 BPM RATE IN=3.06 BPM RATE OUT=3.02 BPM MW IN=9.49 PPG MW OUT=9.53 PPG ECD =11.06 PPG MW TEMP IN=88.3 DEG MW TEMP OUT=87.2 'DEG BHCT=140 DEG ROP=50 FPH WOB=2.9 K CIRC PSI= 3400PSI IAP=625 PSI OAP=0 PSI PVT=236 BBLS DRILLED AHEAD TO 13850' WEIGHT I TRANSFER BECOMING AN ISSUE PUMP 20 BBL HI VIS SWEEP. RETURNED TO SURFACED WITH ABOUT 5%INCREASE IN CUTTINGS -PERFORM LONG WIPER TO THE WINDOW TO CLEAN UP HOLE AND CLEAN UP LONG TANGENT IN TUBING 21:30 - 00:00 2.50 DRILL P PROD1 PERFORM WIPER TO WINDOW. OPEN EDC. -JET ACROSS WHIPSTOCK AND UP INTO TUBING TAIL. -PUMP BOTTOMS UP AT 4.2 BPM. ABOUT A 10%INCREASE IN CUTTINGS COMING ACROSS SHAKER. 1/25/2015 00:00 02:45 2.75 DRILL P PROD1 ;-CONTINUE WITH WIPER -LOG TIE IN AT WHIPSTOCK +11 -RIH TO DRILL AHEAD SLOW PUMP RATE TO RUN THROUGH 23N -STACKED WEIGHT AT 121500' BUILD CIRC PRESSURE. PICK UP CLEAN. SLOW PUMPS TO GET BY -GET SPR'S 02:45 - 04:00 1.25 DRILL P PROD1 ESTABLISH DRILLING PARAMETERS FREE SPIN=3010 PSI AT 3.00 BPM RATE IN=3.0 BPM RATE OUT=3.0 BPM MW IN=9.51 PPG MW OUT=9.48 PPG ECD =10.99 PPG MW TEMP IN=92.4 DEG MW TEMP OUT=92.4 DEG BHCT=140 DEG ROP= FPH WOB=3.85 K CIRC PSI=3600 PSI IAP=693 PSI OAP=0 PSI BRINGING IN REMAINDER OF NEW MUD DISCUSSED WITH GEO DIRECTION. 04:00 - 06:00 2.00 DRILL P PROD1 DRILLING AHEAD AT 13903' DRILLED AHEAD TO 13947' MAKE SHORT BHA WIPERS MW IN/OUT 9.5 PPG 06:00 - 08:00 2.00 DRILL P PROD1 MAKE ATTEMPTS TO TRANSFER COIL WEIGHT TO BIT. CANNOT GET WOB TO INITIATE DRILLING. MAKE SEVERAL ATTEMPTS IN COMBINATION WITH SHORT WIPERS,VARYING FLOW RATES AND RUNNING SPEEDS. -ORDER OUT LUBES,PREP FOR LONG WIPER Printed 2/10/2015 9:06:02AM North America-ALASKA-BP Page 14 of 26 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date:1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:00 - 11:15 3.25 DRILL P PROD1 CONDUCT WIPER UP WITH NO ISSUES. PULL INTO 7",OPEN EDC,JET WHIPSTOCK AND THEN CIRCULATE BOTTOMS UP AT 4.5 BPM ALL THE WAY UP TO 4-1/2"TUBING. I CONSISTENT CUTTINGS ACROSS SHAKER, FAIRLY SHARP TO INDICATE CUTTINGS ARE MOVING UP HOLE AND NOT ROLLING ON !BOTTOM TOO LONG. LOG TIE-IN WITH+9.5' CORRECTION. CONTINUE WITH WIPER DOWN INTO OPEN HOLE AT 2.9 BPM,2880 PSI. SOW RANGING FROM INITIAL OF 15K DOWN TO 9K AT 13,900'MD WHILE RUNNING IN HOLE. TAG BOTTOM AT 13,949' 11:15 - 15:30 4.25 DRILL P PROD1 DRILL AHEAD FROM 13,949'. FREE SPIN 2990 PSI AT 2.95 BPM. -2.75-3.0 BPM,3215-3500 PSI,2.2-2.8K WOB I(HAVING A HARD TIME WITH COIL WEIGHT TRANSFER-ADDED LUBES BUT SHORT TERM HELP),ECD INCREASED FROM 10.85 TO 11.0 PPG LOSSES HAVE INCREASED FROM AVERAGING 4 BPH TO AS MUCH AS 30 BPH; RESISTIVITY READING SUGGESTS UNMAPPED FRACTURE AT 14,040'. CONDUCTED WIPER TO SEE IF IT WOULD IMPROVE COIL WEIGHT TRANSFER. ATTEMPT TO DRILL PER WELL PLAN BUT CANNOT DRILL AHEAD. LOSSES INCREASED TO 120 BPH ONCE BACK ON BOTTOM AND PUMPS INCREASED. CONTACT ODE AND FIELD SUPERINTENDENT,PULL TO WINDOW PER WELL PLAN. CALLED OUT 580 BBLS OF BUILT MUD AT PLANT AND BUILDING 580 MORE 15:30 - 17:15 1.75 DRILL P PROD1 POH TO VMNDOW AT 2.15 BPM,2035 PSI, LOSS RATE SLOWED TO 90 BPH WITH REDUCED ECD. LOWERED RATE TO 1.55 BPM AND LOSS RATE SLOWED TO 45 BPH. CONTINUE PULLING TO WINDOW WITH NO HOLE ISSUES. IN WINDOW,PUMPING AT.55 BPM WITH LOSS RATE OF 18 BPH. MW IN 9.45 PPG,MW OUT 9.52 PPG -DISCUSS OPTIONS WITH ODE AND FIELD SUPERINTENDENT. DECISION IS TO ATTEMPT TO MOVE FORWARD WITH DRILLING IN ATTEMPT TO MOVE PAST AND FILL THIEF ZONE. MUD BEING LOADED INTO PITS,WAITING ON SECOND TRUCK TO SHOW UP BEFORE MOVING FORWARD WITH PLAN. -MEET WITH CREW FOR UPDATE,GET PIT STRAPS,COMPLETE FLUID MANAGEMENT PERMITS Printed 2/10/2015 9:06:02AM North America-ALASKA-BP Page 15 of 26 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date:1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:OOAM Rig Release: Rig Contractor NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:15 - 19:20 2.08 DRILL P PROD1 DISCUSSION AMONGST CREW IS THAT SLIDING IS GOING TO BE VERY DIFFICULT. FLOW CHECK AT WINDOW,NO FLOW(ON LOSSES). POH FOR BIT CHANGE AND PICK UP AGITATOR WHILE WAITING ON TRUCKING. CADE MODEL HAD AGITATOR PICKUP AT -14,250',USED WAIT TIME AS OPPORTUNITY TO PREVENT FURTHER DOWNTIME. -POH AT 2.15 BPM,1710 PSI,ECD PICKED UP TO 10.6 PPG,LOSS RATE OF 10 BPH WHILE POH. MW IN 9.5 PPG,MW OUT 9.53 PPG. 19:20 - 20:00 0.67 DRILL P PROD1 -FLOW CHECK FOR 15 MIN. (NO FLOW) -FILL HOLE TO VERIFY LOSS RATE.STATIC LOSS RATE LESS THAN 1 BPH -PJSM ABOUT LAYING DOWN AND PICKING UP BHA TAG UP 20:00 - 22:00 2.00 DRILL P PROD1 BREAK DOWN BHA BIT GRADED 1-1 SLB CHANGED OUT PACKOFFS OUT. STAB INJECTOR ON WELL. FILL WELL. LOSS RATE MINIMAL. CLOSE SWAB/MASTER -PT PACKOFFS. LOW/HIGH 250/3800 CHARTED.GOOD. CHECK ON MUD AVAILABILITY. CALL ON TRUCKING -DISCUSS WITH TEAM THE PATH FORWARD. STATIC LOSSES AT MINIMUM -MAKE UP BHA#7 22:00 - 00:00 2.00 DRILL P PROD1 -STAB INJECTOR. PT QTS LOW/HIGH -COME ONLINE TO VERIFY AGITAOR WORKING. -RIH AT MIN RATE 1/26/2015 00:00 - 02:00 2.00 DRILL P PROD1 -CONTINUE IN THE HOLE WITH BHA#7 02:00 - 03:15 1.25 DRILL P PROD1 -PERFORM TIE IN TO RA TAG-5' CORRECTION PULL UP HOLE TO 10500'TO RUN CCL LOG WHILE WE WAIT FOR TRUCK. 3RD TRUCK ARRIVED. -PERFORM CCL LOG 10487'TO 11452' AT 1000'/HR -CLOSE EDC. LOST 6 BBLS WHILE RUNNING IN HOLE. -HEAD INTO OPEN HOLE PARAMETERS OUTSIDE WINDOW FREE SPIN=3520 PSI AT 2.81 BPM RATE IN=2.82 BPM RATE OUT=2.74 BPM MW IN=9.55 PPG MW OUT=9.52 PPG ECD =10.82 PPG MW TEMP IN=75.8 DEG MW TEMP OUT=72.7 DEG BHCT=132 DEG IAP=61 PSI OAP=0 PSI Printed 2/10/2015 9:06:02AM • North America-ALASKA-BP Page 16 of 26 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date:1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA UW:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:15 - 06:00 2.75 DRILL P PROD1 PERFORM SPR'S. WHILE RUNNING PAST THIEF(13990-14050)LOSS RATE WOULD FALL OFF TO 40 BPH, I DRILL AHEAD AT 14116'TO 14134' BHI NEAR BIT INCLINATION READING HIGH. PERFORM WIPER ABOVE THIEF TO TROUBLESHOOT -BRING PUMP RATE UP TO DRILLING RATE. LOSS RATE BETWEEN 60-80 BPH FREE SPIN=3520 PSI AT 2.71 BPM RATE IN=2.73 BPM RATE OUT=1.63 BPM MW IN=9.53 PPG MW OUT=9.53 PPG ECD =10.76 PPG IAP=11 PSI OAP=0 PSI 06:00 - 10:15 4.25 DRILL P PROD1 DRILL AHEAD FROM 14,115'. FREE SPIN OF 3400 PSI AT 2.75 BPM. 1-DRILL AHEAD WITH GOOD COIL WEIGHT TRANSFER. -CONDUCT WIPER TO THIEF ZONE AND TURN AROUND. RECORD SLOW PUMP RATES. CONTINUE DRILLING WITH GOOD WOB AND ROP. -2.3-3.0 BPM,3510-4030 PSI,2.0-2.5K WOB, ECD 10.7-10.85 PPG,FAST ROP OF 125 FPH -CONDUCT FREQUENT WIPERS DUE TO FAST ROP AND IN ATTEMPT TO STUFF CUTTINGS INTO THIEF ZONE -MW IN 9.58 PPG,MW OUT 9.59 PPG, LOSSES RANGED FROM 60-100 BPH DEPENDING UPON FLOW RATE 10:15 - 13:45 3.50 DRILL P PROD1 LONG WIPER TRIP TO WINDOW. LOSSES STILL HIGH AT-90 BPH WITH PUMP AT FULL RATE AT BEGINNING OF WIPER. MOVE PAST SUSPECTED THIEF ZONE AT 14,050'WITH NO CHANGE IN LOSSES. -LOSSES BEGIN TO SLOW AS BHA IS PULLED UP PAST 13,900'. PULL TO 12,400'AND LOWER PUMP RATE TO 2.5 BPM; LOSSES SLOWED TO 60 BPH. APPROACH WINDOW AT 2.5 BPM WITH A LOSS RATE OF 18 BPH. PULL INTO WINDOW,OPEN EDC. JET WINDOW AND PULL THROUGH 7"VERY SLOW AT 4.25 BPM WITH 55 BPH LOSS RATE. CONTINUE TO PULL UP HOLE INTO 4-1/2"AT 4.25 BPM UNTIL BOTTOMS UP AT SHAKER. WELL RELATIVELY CLEAN;SOME CLAY BALLS AND SLIGHT INCREASE IN CUTTINGS. CIRCULATE ADDITIONAL 10 BBLS PAST BOTTOMS UP,CONSISTENT BUT LOW VOLUME OF CUTTINGS. -MOVE BACK DOWN,FLOW CHECK AT WINDOW. ALL GOOD. CLOSE EDC,PUMP AT MINIMAL RATE WITH ALMOST 1-TO-1 RETURNS. LOG TIE-IN WITH+10' CORRECTION. -LOSSES INCREASED TO 36 BPH WHILE MOVING DOWNHOLE AND PUMPING AT 1.5 11 BPM,1625 PSI. Printed 2/10/2015 9:06:02AM North America-ALASKA-BP Page 17 of 26 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date:1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:45 - 17:30 3.75 DRILL P PROD1 DRILL AHEAD FROM 14,425'. FREE SPIN OF 3640 PSI AT 3.0 BPM. -2.75-3.0 BPM,3700-4210 PSI,1.73-4.7K WOB, ECD STEADY AT 10.85 PPG,ROP 45-130 FPH -PICKUPS FOR WIPERS ARE RELATIVELY CLEAN AT 44-50K PUW. LOSSES STAYING IN THE 45-55 BPH RANGE WHILE DRILLING AT 2.85-2.95 BPH. MW IN 9.58 PPG,MW OUT 9.60 PPG, LOSSES AVERAGING 45-60 BPH WHILE ON 'BOTTOM DRILLING -AGITATOR SEEMS TO BE"CYCLING"IN PRESSURE PULSES 17:30 - 18:00 0.50 DRILL P PROD1 ABLE TO SLIDE FAIRLY WELL WITH 8-14K SOW BUT NOT GETTING WOB,STARTING TO SEE STICK-SLIP. CONDUCT SHORT WIPER TO SEE IF IT WILL HELP WITH WEIGHT TRANSFER. 18:00 - 19:00 1.00 DRILL N DFAL PROD1 CIRCULATING PRESSURE ERRATIC/HIGH. PERFORM WIPER TRIP ABOVE THIEF TO SEE IF IT MAKES BETTER 19:00 - 19:20 0.33 DRILL N DFAL PROD1 MOTOR OR AGITATOR PLUGGING OFF. -PERFORM FLOW CHECK -FLOW BLED OFF FROM 1.0 BPM TO.20 BPM AND BECAME STEADY. -SHUT WELL IN PER STANDING ORDERS (SHUT HCR,INCREASE PACKOFF PRESSURE, OPEN HCR AGAINST CLOSED CHOKE) -MONITOR PRESSURES. INITIAL S/I PRESSURE=43#, S/I COIL PRESSURE=0# 19:20 - 19:45 0.42 DRILL N DPRB PROD1 MONITOR WELL(MAKE LEVEL 0# NOTIFICATIONS SITP=300# SICTP=0# 4.5 BBL PIT GAIN 19:45 - 20:06 0.35 DRILL N DPRB PROD1 MOVE COIL DOWN 300'TO WARM COIL. WHP DROPPED TO 0#IN 4 MINUTE 20:06 - 20:20 0.23 DRILL N DPRB PROD1 MOVE COIL OUT OF HOLE. WHP INCREASING TO 220 IN 7 MIN 20:20 - 21:00 0.67 DRILL N DPRB PROD1 BRING PUMPS ON AT.25 BPM WHILE RUNNING TO BOTTOM FOR CIRCULATION ATTEMPT. DISCUSS WITH CTS OP TO KEEP ECD BELOW DRILLING ECD OF 10.7 21:00 - 23:25 2.42 DRILL N DPRB PROD1 PJSM W/CREW. DISCUSS ASSIGNMENTS. ATTEMPT CIRCULATION TO TIGER TANK BRING PUMPS UP TO ICP OF 1.5 BPM AT 1800#, DRILLER CRACK CHOKE TO MAINTAIN. AT 1800#. WELL WAS ON TOTAL LOSSES. CLOSE CHOKE. CONTACTED SUPERINTENDENT. 23:25 - 23:40 0.25 DRILL N DPRB PROD1 START PULLING OUT OF OPEN HOLE AT 4 FPM PUMP DOWN COIL MAINTAINING PIPE DISPLACEMENT PRESSURE INCREASED TO 500 PSI WHILE PULLING. PRESSURE DROPPED TO 280# WHEN WE RAN BACK IN HOLE ACTING LIKE WE ARE SWABBING. Printed 2/10/2015 9:06:02AM • • North America-ALASKA-BP Page 18 of 26 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date:1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:40 - 00:00 0.33 DRILL N DPRB PROD1 POOH AT 24 FPM. SITP INCREASED TO 660# AND LEVELED OFF. CONTINUE TO PULL OFF BOTTOM. PUMPING AT.25 BPM TO REPLACE PIPE DISPLACEMENT CURRENTLY PULLING TO WINDOW 1/27/2015 00:00 - 01:30 1.50 DRILL N DPRB PROD1 CURRENTLY ABOVE WINDOW IN 7"CASING. OPEN NEEDLE VALVE ON INJECTOR TO VERIFY FLUID TO SURFACE. SITP=330#. SD PUMPS. STAY THE SAME 01:30 - 01:40 0.17 DRILL N DPRB PROD1 STILL ACTING LIKE WE ARE SWABBING. PULL INTO TUBING TAIL AT 11300' NO CHANGE. RIH TO 11460'. PUMP 2 BBLS EVERY 30 MINUTES TO KEEP COIL WARM. 01:40 - 02:15 0.58 DRILL N WAIT PROD1 PARK AT 11460' j MONITOR PRESSURES PUMPING DOWN COIL TO KEEP WARM EVERY HALF HOUR 02:15 - 06:00 3.75 DRILL N WAIT PROD1 MONITOR/WAIT FOR PLAN FROM TOWN 06:00 - 08:30 2.50 DRILL N WAIT PROD1 WAIT ON ORDERS FROM TOWN. ENGINEERS SAND WTLARE DISCUSSING OPTIONS OF PLAN FORWARD. PLAN PRESENTED DURING MORNING CALL;SLIGHT DEVIATIONS DISCUSSED AND AGREED TO. OCN#4 PUBLISHED AND AGREED TO. -BREAKING CIRCULATION AT.25 BPM EVERY 30 MINUTES TO PREVENT COIL FREEZE-UP; SHUT-IN PRESSURE BUILDS SLIGHTLY BUT BLEEDS OFF ONCE PUMPING IS STOPPED 08:30 - 09:30 1.00 DRILL N DPRB PROD1 PJSM WITH RIG CREW REGARDING CIRCULATIONS. DISCUSS PRESSURE BARRIERS,EXPECTATIONS FROM FORMATION,FLOW PATH LINE-UP,SPECIFIC DUTIES OF PERSONNEL. DRILLER, MOTORMAN,FLOORHAND MOVE OUT TO CONFIRM LINE-UPS,LINE-UP TRUCK TO PITS TO FILL PITS. -BREAKING CIRCULATION AT.25 BPM EVERY 30 MINUTES TO PREVENT COIL FREEZE-UP; STILL HAVE SLIGHT PRESSURE BUILD WHEN PUMPING BUT IT QUICKLY DROPS OFF TO 0 PSI 09:30 - 10:15 0.75 DRILL N DPRB PROD1 MAKE CONFIRMATION WALK THROUGH OF LINE-UP TO MUD-GAS SEPARATOR. STEAM VENT LINE TO CONFIRM CLEAR. FILL PITS IN PREPARATION FOR LOSSES DURING CIRCULATION. TOOLPUSHER AND WSL MAKE FINAL VERIFICATIONS. -BREAKING CIRCULATION AT.25 BPM EVERY 30 MINUTES TO PREVENT COIL FREEZE-UP; NO PRESSURE BUILDING DURING THE LAST CIRCULATION. Printed 2/10/2015 9:06:02AM • North America-ALASKA-BP Page 19 of 26 Operation Summary Report _---- --_-__--------_.--- Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date:1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:15 - 10:45 0.50 DRILL N DPRB PROD1 OPEN UP TO CLOSED CHOKE,NO PRESSURE. OPEN UP FOR FLOW CHECK, NO FLOW;WHITEY VALVE AT LUBRICATOR INDICATES WELL IS ON SLIGHT VAC. BRING ON PUMPS TO BREAK CIRCULATION,2.4 BBLS TO FILL WELL. CIRCULATE AT 2 BPM, 2210 PSI,-73 BPH LOSS RATE. -RUN DOWN QUICKLY THROUGH 4-1/2" PUMPING AT 2.6 BPM,3460 PSI,THROUGH BIT. NO INDICATION OF ANY PACKOFF AROUND BHA THROUGH MICROMOTION RETURNS BUT CIRCULATION PRESSURE STILL VERY ERRATIC;ATTRIBUTE FLUCTUATION TO MOTOR OR AGITATOR PROBLEM. LOSSES INCREASED TO 120 BPH WHEN BHA WAS RUN DOWN. -MOVE DOWN INTO 7'CASING,PLACE BHA AT WINDOW TO OPEN EDC. 10:45 - 11:30 0.75 DRILL N DPRB PROD1 PREPARE FOR CIRCULATING BOTTOMS UP. PVT AT WINDOW,11,495'MD,305 BBLS. STILL OBSERVING A SLOWER THAN NORMAL DROP IN OUT RATE BUT DEFINITIVELY DROPPING DOWN. DROPPED FROM INITIAL RATE OF.7 BPM WITH PUMPS OFF TO.24 BPM IN 2 MINUTES. EDC OPEN. -BRING ON PUMPS FOR INITIAL BOTTOMS UP TO 3.0 BPM,2380 PSI,NO ISSUES AT MGS OR SHAKER -INCREASE TO 3.5 BPM,2760 PSI. MM IN 3.5, MM OUT 1.67 BPM,MW IN 9.55 PPG,MW OUT 9.63 PPG,INITIAL PVT 302 -JET ACROSS WHIPSTOCK TRAY,PARK AND CONTINUE TO CIRCULATE BOTTOMS UP THROUGH MUD-GAS SEPARATOR. CIRCULATE AT 3.8 BPM,3062 PSI,ECD 10.87 PPG,MM OUT 2.31,MW IN 9.55 PPG,MW OUT 9.63 PPG,LOSS RATE OF 90 BPH, ALL SURFACE EQUIPMENT IN GOOD CONDITION. INCREASE CIRCULATION RATE TO 4.25 BPM,3545 PSI,ECD 11.0 PPG. MM OUT 2.50 BPM,MW IN 9.58 PPG,MW OUT 9.63 PPG,LOSSES INCREASED TO AVERAGING 100-105 BPH -INITIAL BOTTOMS UP COMPLETED AT 4.25-4.3 BPM,INITIAL CIRC OF 4000 PSI THAT DROPPED DOWN TO 3610 PSI,ECD OF 11.0 PPG. INITIAL MM OUT OF 2.57 BPM INCREASED TO 2.61 BPM,MW IN 9.59 PPG DOWN TO 9.56 PPG,MW OUT 9.63 PPG DOWN TO 9.57 PPG,LOSSES AVERAGE 100 BPH Printed 2/10/2015 9:06:02AM • North America-ALASKA-BP Page 20 of 26 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015End Date:•1/30/2015 1X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/me:5/22/1994 12:00:00AM Rig Release Rig Contractor:NORDIC CALISTA UWI:500292248400 - Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) _ Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:30 - 12:15 0.75 DRILL N DPRB PROD1 CIRCULATE BOTTOMS UP FROM WINDOW. CIRCULATE AT 4.28 BPM,3400 PSI,MM OUT 2.60 BPM,MW IN 9.57 PPG,MW OUT 9.57 PPG,INITIAL LOSS RATE OF 100 BPH -CONTINUE WITH CIRCULATING AT 4.23 BPM, 3370 PSI,MM OUT 2.63 BPM,ECD 10.97 PPG, MW IN 9.57 PPG,MW OUT 9.56 PPG,LOSSES AT 96 BPH -SECOND BOTTOMS UP COMPLETE WITH FINAL RATE OF 4.1 BPM,3335 PSI,ECD OF 11.0 PPG,MW IN 9.56 PPG,MW OUT 9.56 PPG, LOSSES AT 79 BPH.NO SIGNS OF GAS DURING EITHER CIRCULATION. -TOTAL LOST DURING BOTH CIRCULATIONS=137 BBLS. 12.15 - 13:00 0.75 DRILL N DPRB PROD1 BLEED DOWN TO PERFORM FLOWCHECK PERFORM EXHALE TEST -SHUT DOWN PUMPS.FLOW RATE DROPPED IMMEDIATELY TO 1.8 BBLS/MIN TAPERING OFF TO.2 BBLS/MIN IN 45 MINUTES. -TRIP IN HOLE 100'TO PREVENT COIL • FREEZE-UP. 13.00 - 13:30 0.50 DRILL N DPRB PROD1" PERFORM FLOWCHECK. -NO FLOW AT SHAKERS. -PERFORM 30 MINUTE FLOWCHECK-WELL STATIC. -CALL ODE WITH FLOWCHECK RESULTS-GIVEN PERMISSION TO POOH FOR BHA CHANGE. 13:30 - 16:00 2.50 DRILL N DFAL PROD1 POOH 16:00 - 16:10 0.17 DRILL N DFAL PROD1 FLOW CHECK WELL HOLD PJSM TO PULL THE BHA,SHUT IN THE WELL TO TEST THE HCR&PACK OFF 16:10 - 16:45 0.58 DRILL N DFAL PROD1 GOOD NO FLOW,PULL THE BHA 16:45 - 17:20 0.58 DRILL N DFAL PROD1 BHA OOH,BIT GRADE=1-1-WT-A-X-I-NO-BHA MU NOZZLE BHA TO TEST THE PACK OFF& _ • HCR AND STAB ON 17:20 - 17:40 0.33 DRILL N DFAL PROD1 SHUT IN THE WELL TO TEST THE PACK OFF& HCR 17:40 - 17:50 0.17 DRILL N DFAL PROD1 GOOD TEST,OPEN CHOKE AND CIRC TO WARM THE COIL 17:50 - 17:55 0.08 DRILL N DFAL PROD1 COIL IS WARM,CLOSE THE CHOKE AND OPEN THE THE SWAB TO CHECK FOR PRESSURE NO PRESSURE,OPEN THE CHOKE TO CHECK FOR FLOW NO FLOW,ONLINE WITH THE PUMP TO ENSURE THE HOLE IS FULL 17:55 - 18:30 0.58 DRILL N DFAL PROD1 HOLE TOOK 2 BBLS,CONTINUE CIRCULATING DURING CHANGE OUT 18:30 - 19:46 1.27 DRILL N DFAL PROD1 CREW CHANGE. PJSM. GO OVER HOLE FILL /NONS-SHEARABLE'S ACROSS STACK MAKE UP NEW BHI BHA 19:46 - 21:30 1.73 DRILL N DFAL PROD1 RIH 21:30 - 22:00 0.50 DRILL N DFAL PROD1 LOST COMMUNICATION WITH BHI. CHECK SURFACE EQUIPMENT 22:00 - 00:00 2.00 DRILL N DFAL PROD1 PJSM. PERFORM FLOW CHECK GOOD NO FLOW. Printed 2/10/2015 9:06:02AM • North America-ALASKA-BP Page 21 of 26 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date:1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date ! From-To I Hrs Task I Code NPT NPT Depth Phase Description of Operations (hr) (usft) 1/28/2015 00:00 - 01:20 1.33 DRILL N DFAL PROD1 AT SURFACE. BREAK LQC, MEGGED CABLE AND CHECKED CONTINUITY THROUGH HEAD. GOOD. -MAKE UP NEW MWD BHA 01:20 - 01:40 0.33 DRILL N DFAL PROD1 -STAB INJECTOR, PT QTS LOW AND HIGH. -COME ONLINE TO TEST AGITATOR. BHI VERIFIED COMMS. OPEN EDC 01:40 - 03:20 1 1.67 DRILL N DFAL PROD1 RIH -BACK TO DEPTH THAT BHI MWD TOOLS FAILED. 03:20 - 04:20 1.00 DRILL P PROD1 -CLOSE EDC. -LOG RA TIE IN TOTAL LOSS AT WINDOW 21 BBLS -CORRECTION OF-7.5 -SLOW PUMP RATE TO.5 BPM WHILE GOING BY 23N SHALE AT 11890'TO 11960' 04:20 - 05:10 I 0.83 DRILL I P PROD1 RIH AT DECREASED RATE TO MINIMIZE LOSSES AND KEEP ECD'S DOWN CIRCULATING PRESSURE = 1677PSI AT 1.5 BPM RATE IN=1.50 BPM RATE OUT=1.12 BPM MW IN=9.51 PPG MW OUT=9.57 PPG ECD =10.47 PPG SOW=17.1 K LOSS RATE=20-30 BPH IAP=143 PSI OAP=0 PSI 05:10 - 06:00 0.83 I DRILL I N DPRB PROD1 WHILE RUNNING IN THE HOLE. AT 13480'. OUT DENSITY ALARM WENT OFF. OUT DENSITY WAS ACTING ERRATIC. STOPPED RUNNING IN HOLE. SHUT PUMPS OFF. WELL STILL FLOWING WITH DENSITY BEING ERRATIC. NOT SEEING ANY GAS AT MONITOR IN DOG HOUSE. DRILLER WENT TO SHAKER TO INVESTIGATE WITH PORTABLE 4 GAS METER. THE METER PEAKED AT 35%LEL AND DROPPED DOWN TO 25% AT SHAKER. SHUT WELL IN AS PER STANDING ORDERS. -INITIAL SITP=88# STABILIZED AT 330# AFTER 40 MIN. DRILLER CONTINUEING TO MONITOR -INITIAL SICTP=443# STABILIZED AT 273# -WELL SHUT IN AT 05:23 BY CLOSING HCR, INCREASE PACKOFF PRESSURE. OPEN HCR TO A CLOSED CHOKE. -NOTIFIED DRILLING SUPERINTENDENT, ODE, AND WTL 06:00 - 10:15 4.25 DRILL N DPRB PROD1 DISCUSS WELL CONDITIONS WITH WTL& ODE AND COME UP WITH A PLAN FORWARD 10:15 - 11:00 0.75 DRILL N DPRB PROD1 OCN RECEIVED,DISCUSS WITH DRLG SUPT DISCUSS WITH ODE&WTI_TO PERFORM EXHALE TEST AT PRESENT DEPTH AS RIH TO TD WILL INDUCE WHP WITH 2.75 BBLS OF PIPE DISPLACEMENT PERFORM EXHALE TEST AT PRESENT DEPTH HOLD PJSM WITH CREW TO DISCUSS PLAN FORWARD Printed 2/10/2015 9:06:02AM • North America-ALASKA-BP Page 22 of 26 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date:1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 11:45 0.75 DRILL N DPRB PROD1 WE HAVE PERMISSION FROM THE WTLTO OPEN THE WELLAND PERFORM THE EXHALE TEST STOP AT PRESENT DEPTH(14190')AND • PERFORM EXHALE TEST TAKING RETURNS THROUGH THE CHOKE AND MGS BLEED OFF IN 0.30 BBL INCREMENTS AS DISCUSSED WITH THE DRLG SUPT OPEN CHOKE AT 11:05:30 WHP=176 PSI PVT=309 BBLS WHP BLED OFF WITH NO FLOW AT THE SHAKER WHP STABLE AT 16 PSI,CLOSE CHOKE AT 11:08:57 PRESSURE BUILT UP FROM 16 PSI AND IS STABLE AT 26 PSI OPEN CHOKE AT 11:15:02 WHP=26 PSI PVT=309 BBLS NO FLOW AGAIN CLOSE IN THE CHOKE WITH NO PRESSURE BUILD UP • DRLG SUPT ON LOCATION,DISCUSS MOVING 'FORWARD WITH OCN TO RIH TO PERFORM A BOTTOMS UP KILL ONLINE WITH PUMP TO WARM COIL,WELL TOOK 9 BBLS TO FILL 11:45 - 12:05 0.33 DRILL N DPRB PROD1 RIH TO TD AND CIRCULATE A BOTTOMS UP 12:05 - 14:15 2.17 DRILL N DPRB • PROD1 TAG BOTTOM,ZERO THE OUT MM AND CIRCULATE A BOTTOMS UP ONLINE WITH PUMP AT DRILLING RATE AS PER OCN POOH AT 1-2 FPM MUD VOLUME ON VAC TRUCKS=1090 BBLS, .PVT=284 BBLS IN MM=2.88 BPM OUT MM=1.33 LOSS RATE=1.55 BPM OR 93 BPH OUT DENSITY AT 9.35 PPG,AFTER A FEW BBLS RETURNED DENSITY IS STABLE AT 9.5+ 12:35 IN MM=2.85 BPM OUT MM=1.38 LOSS RATE=1.47 BPM OR 88 BPH DENSITY IS 9.5+PPG 13:05 OUT RATE INCREASING,CAME UP 0.2 BPM,NO CHANGE IN DENSITY 9.5+PPG 13:25 AT 110 BBLS INTO THE BOTTOMS UP THE OUT RATE IS DROPPING OFF DROPPED TO 1.1 BPM,DENSITY STILL THE SAME 14:05 WE HAVE BOTTOMS UP DENSITY STILL GOOD,NO SIGNS OF GAS IN RETURNS 14:15 - 14:20 0.08 DRILL N DPRB PROD1 15 BBLS PAST BOTTOMS UP,NO SIGN OF A GAS OR LIQUID INFLUX LINE UP TO TAKE RETURNS THROUGH NORMAL FLOW PATH AND PREP TO FLOW CHECK WELL MM IN RATE=2.82 BPM OUT MM RATE=1.38 BPM LOSS RATE =1.44 BPM OR 86 BPH Printed 2/10/2015 9:06:02AM North America-ALASKA-BP Page 23 of 26 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date:1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:20 - 15:00 0.67 DRILL N DPRB PROD1 SHUT DOWN THE PUMP AND MONITOR THE WELL FINGERPRINT DATA 14:22:00 PVT=162 BBLS BHP=4826 PSI OUT RATE=1.21 BPM 14:23:25 PVT=163 BBLS BHP=4715 PSI OUT RATE=0.72 BPM 14:26:55 PVT=164 BBLS BHP=4710 PSI OUT RATE=0.38 BPM 14:28:10 PVT=165 BBLS BHP=4691 PSI OUT RATE=0.29 BPM 14:32:20 PVT=166 BBLS BHP=4658 PSI OUT RATE=0.17 BPM '14:38:35 PVT=167 BBLS BHP=4638 PSI OUT RATE=0.09 BPM 14:53:50 PVT=168 BBLS BHP=4612 PSI OUT RATE=0.04 BPM 15:00:00 PVT=168 BBLS BHP=4583 PSI OUT RATE=0.03 BPM TOOK 6 BBLS BACK,RETURNS SLOWED TO 0.04-0.03 BPM,THIS IS THE SAME FINGERPRINT FROM PREVIOUS FLOW CHECKS 15:00 - 15:20 0.33 DRILL N DPRB PROD1 WE ARE AT THE MAX TIME WITHOUT PUMPING,COME ONLINE WITH THE PUMP AND CALL THE DRLG SUPT&ODE TO DISCUSS CONTINUING OUR OPERATIONS STEP 5 OF THE OCN-IF THE WELL IS STATIC OR SHOWS THE SAME BLEED DOWN FINGERPRINT WE HAVE SEEN,PROCEED TO CONTINUE DRILLING 115:20 - 15:25 0.08 DRILL P PROD1 TALKED TO BOTH DRLG SUPT&ODE AND WE ALL AGREE THIS IS THE SAME FINGERPRINT WE HAVE SEEN IN FLOW CHECKS AND TO PROCEED WITH NORMAL DRILLING OPERATIONS OBTAIN SPR'S 15:25 - 16:00 0.58 DRILL P PROD1 BACK ON BOTTOM DRILLING FREE SPIN=3325 PSI AT 2.8 BPM RATE IN=2.81 BPM RATE OUT=1.15 BPM LOSS RATE=1.66 BPM OR 99 BPH MW IN=9.58 PPG MW OUT=9.57 PPG ECD =10.71 PPG ROP=74 FPH WOB=3.27 K CIRC PSI= 3772 PSI IAP=60 PSI OAP=0 PSI PVT=243 BBLS 16:00 - 19:30 3.50 DRILL P PROD1 BACK ON BOTTOM DRILLING FREE SPIN=3325 PSI AT 2.8 BPM RATE IN=2.93 BPM RATE OUT=1.51 BPM LOSS RATE=1.42 BPM OR 85 BPH MW IN=9.58 PPG MW OUT=9.56 PPG ECD =10.83 PPG ROP=69 FPH WOB=1.69 K CIRC PSI= 3898 PSI IAP=72 PSI OAP=0 PSI PVT=183 BBLS Printed 2/10/2015 9:06:02AM North America-ALASKA-BP Page 24 of 26 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date:1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:30 - 19:45 0.25 DRILL P PROD1 BACK ON BOTTOM DRILLING FREE SPIN=3325 PSI AT 2.8 BPM RATE IN=2.84 BPM RATE OUT=1.37 BPM LOSS RATE=1.47 BPM OR 88 BPH MW IN=9.58 PPG MW OUT=9.56 PPG ECD =10.83 PPG ROP=69 FPH WOB=1.69 K CIRC PSI= 3898 PSI IAP=72 PSI OAP=0 PSI PVT=183 BBLS PERFORM LONG WIPER TO WINDOW 19:45 - 21:30 1.75 DRILL P PROD1 AT WINDOW 21:30 - 00:00 2.50 DRILL P PROD1 • DRILL AHEAD TO 14763' BHI HAVING TOOL ISSUES. -TROUBLESHOOTED. ORIENTER FAILED. CALLED TOWN GEO AND ODE 1/29/2015 00:00 - 00:30 0.50 DRILL P PROD1 BHI ORIENTER FAILED -GEOLOGIST TALKED WITH TOWN GEO. THEY ARE CALLING UNCORRECTED TD AT 14763' CALLED ODE(ZACH BROWNING) AGREED 00:30 - 01:00 0.50 DRILL P PROD1 SHUT DOWN THE PUMP AND MONITOR THE • WELL !FINGERPRINT DATA 00:33:00 PVT=324 BBLS BHP=4864 PSI OUT RATE=1.14 BPM 00:33:00 PVT=324 BBLS BHP=4797 PSI OUT RATE=0.89 BPM 00:34:00 PVT=326 BBLS BHP=4778 PSI OUT RATE=0..81 BPM 00:35:04 PVT=327 BBLS BHP=4766 PSI OUT RATE=0..65 BPM 00:36:05 PVT=328 BBLS BHP=4757 PSI OUT RATE=0.60 BPM 00:39:00 PVT=329 BBLS BHP=4736 PSI OUT RATE=0.46 BPM 00:40:27 PVT=330 BBLS BHP=4729 PSI OUT RATE=0.37 BPM 00:43:42 PVT=331 BBLS BHP=4711 PSI OUT RATE=0.35 BPM 00:47:20 PVT=332 BBLS BHP=4696 PSI OUT RATE=0.22 BPM 00:50.26 PVT=333 BBLS BHP=4685 PSI OUT RATE=0.16 BPM 00:57:54 PVT=334 BBLS BHP=4658 PSI OUT RATE=0.06 BPM THIS IS THE SAME FINGERPRINT FROM PREVIOUS FLOW CHECKS. 01:00 - 02:55 1.92 DRILL P PROD1 SLOW PUMPS COMING INTO WINDOW TO.5 BPM. SHUT PUMPS DOWN FOR CHECK UTILIZE OUT MM FOR RETURN TOTAL .25 BPM AT 167.5 OUT MM. 4427# 02:55 - 04:30 1.58 DRILL P PROD1 OPEN EDC. COME ONLINE AT 3.2 BPM. WIPER TO SURFACE 04:30 - 05:45 1.25 DRILL P PROD1 PUMPING AT 3.8 BPM IN. 3.26 BPM OUT. PULLING 100'/MIN MW IN 9.53 MW OUT 9.53 WIPING OUT OF HOLE 05:45 - 06:00 0.25 DRILL P PROD1 PERFORMING FLOW CHECK AT 200' Printed 2/10/2015 9:06:02AM • North America-ALASKA-BP Page 25 of 26 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date:1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UW:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 06:30 0.50 DRILL N DFAL PROD1 GOOD NO FLOW,CIRC COIL WHILE 'FINISHING CHANGE OUT AND HOLDING PJSM 06:30 - 06:45 0.25 DRILL N DFAL PROD1 PJSM TO PULL THE BHA,FUNCTION TEST THE BOPE AND TEST THE HCR&PACK-OFF 06:45 - 07:30 0.75 DRILL N DFAL PROD1 TAG UP,REMOVE THE INJECTOR AND PULL THE BHA 07:30 - 08:30 1.00 DRILL N DPRB PROD1 BHA OOH FILL THE HOLE CLOSE THE SWAB AND FUNCTION TEST THE BOPE MU A NOZZLE AND STAB ON TO TEST THE PACKOFF&HCR GOOD TEST,OPEN WELL TO A CLOSED CHOKE NO PRESSURE,OPEN THE CHOKE I NO FLOW,FILL THE HOLE TOOK 2 BBLS 08:30 - 08:40 0.17 DRILL N I DFAL PROD1 FLOW CHECK WELL 08:40 - 08:55 0.25 DRILL N DFAL PROD1 GOOD NO FLOW,HOLD PJSM TO MU THE BHA 08:55 - 09:05 0.17 DRILL N DFAL PROD1 MU THE BHA,NO RES AND RR BIT 09:05 - 09:30 0.42 DRILL N DFAL PROD1 PT THE QTS 09:30 - 11:25 1.92 DRILL P PROD1 GOOD PT,RIH PUMPING AT 3 BPM TO CLEAN OUT THE TUBING AS WE RIH 11:25 - 11:55 0.50 DRILL N DFAL PROD1 CLOSE THE EDC CTS&BHI ENCODERS NOT MATCHING AT START OF TIE IN LOG TIE IN AND SEE WHICH ENCODER IS CONSISTENT WITH NORMAL TIE IN CORRECTIONS 11:55 - 12:20 0.42 DRILL P PROD1 CORRECT CTS DEPTH-3'WHICH IS CONSISTENT WITH PAST CORRECTIONS,BHI ENCODER HAS A+27'CORRECTION REPLACE BHI ENCODER 12:20 - 13:20 1.00 DRILL P PROD1 BHI ENCODER REPLACED,RIH MM IN RATE=2.58 BPM MM OUT RATE=1.43 BPM 13:20 - 14:25 1.08 DRILL P PROD1 OUTMMDENSITYDROPPINGANDACTING LIKE AIRED UP MUD 0'S ON BOTH GAS DETECTORS IN THE DOGHOUSE MUD AT THE SHAKER STILL VERY MILKY WHITE,NO DISCOLORATION 13:34 AFTER 10 BBLS THE DENSITY IS RETURNING TO NORMAL WEIGHT,STILL NO INDICATION OF GAS AT THE SHAKER OR DISCOLORATION OF THE MUD 14:25 - 16:20 1.92 DRILL P PROD1 TAG TD ON DEPTH AT 14763',PU AND OBTAIN SPR'S,FILL PITS THEN POOH TO THE WINDOW 16:20 - 16:30 0.17 DRILL P I PROD1 LOG TIE IN 16:30 - 19:00 2.50 DRILL P PROD1 CORRECT DEPTH+7'AND RIH TO TD. CORRECTED TD 14763' RECIPROCATE UPHOLE PJSM WITH CREW. DISCUSS BYPASSING HIGH PRESSURE SCREENS. Printed 2/10/2015 9:06:02AM • North America-ALASKA-BP Page 26 of 26 Operation Summary Report Common Well Name:11-30 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/16/2015 End Date:1/30/2015 X3-0164Y-C:(3,536,317.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 21:40 2.67 DRILL P PROD1 POOH WHILE LAYING IN LINER PILL. -MIX ALPINE BEADS AND PUMP DOWNHOLE. -LAY IN LINER PILL FROM TD TO TOP OF WINDOW. 21:40 - 22:15 0.58 DRILL P PROD1 PERFORM FINGERPRINT ON FLOWCHECK AT 11,480'. FINGERPRINT DATA 21:40:00 PVT=233 BBLS BHP=4483 PSI OUT RATE=1.51 BPM 21:41:00 PVT=233 BBLS BHP=4419 PSI OUT RATE=0.45 BPM 21:42:00 PVT=234 BBLS BHP=4406 PSI I OUT RATE=0.40 BPM 21:44:00 PVT=235 BBLS BHP=4388 PSI OUT RATE=0.25 BPM 21:52:00 PVT=236 BBLS BHP=4361 PSI OUT RATE=0.20 BPM 21:55:00 PVT=236 BBLS BHP=4352 PSI OUT RATE=0.11 BPM 22:01:00 PVT=238 BBLS BHP=4342 PSI OUT RATE=0.05 BPM 22:05:00 PVT=238 BBLS BHP=4337 PSI OUT RATE=0.06 BPM 22:09:00 PVT=238 BBLS BHP=4330 PSI OUT RATE=0.05 BPM 22:10.00 PVT=238 BBLS BHP=4328 PSI OUT RATE=0.04 BPM THIS IS THE SAME FINGERPRINT FROM PREVIOUS FLOW CHECKS WITH A 6 BBL GAIN DURING 30 MINUTES.PROCEED WITH OPERATIONS. 22:15 - 00:00 1.75 DRILL P PROD1 POOH WITH DRILLING BHA. -PAINT FLAGS AT 10,675'(EOP 10,600'FOR TD) AND 7,425'(7,350'EOP FOR TOW). PUMP AT 2.04 BPM WITH 1.61 BPM OUT. DOWNHOLE LOSSES SLOWED DOWN FROM .75 BPM(11,480')TO NO LOSSES(3,500'). 1/30/2015 00:00 - 00:35 0.58 DRILL P PROD1 PULL OUT OF HOLE WITH DRILLING BHA TO 200'. -TOTAL OF 13 BBLS LOST DURING TRIP FROM WINDOW TO SURFACE. 00:35 - 01:00 0.42 DRILL P PROD1 FLOWCHECK WELL BEFORE BRINGING BHA ACROSS BOP STACK-WELL STATIC. 01:00 - 01:45 0.75 DRILL P PROD1 FLUSH BHA WITH WATER AND AIR. -PULL BHAAND LAY DOWN TO PIPE SHED. END OF RON EVENT-SWAP TO CON EVENT. Printed 2/10/2015 9:06:02AM North America-ALASKA-BP Page 1 of 10 Operation Summary Report Common Well Name:11-30 AFE No Event Type:COM-ONSHORE(CON) Start Date:1/30/2015 End Date:2/4/2015 X3-0164Y-C:(2,503,741.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 1/30/2015 01:45 - 02:20 0.58 RUNCOM P RUNCMP PJSM AND MAKE UP CT NOZZLE TO PUMP SLACK. STAB INJECTOR. 02:20 - 03:20 1.00 RUNCOM P RUNCMP PUMP SLACK OUT OF COIL. 1 -POP OFF INJECTOR AND PULL OUT SLACK. CUT 156'OF ELINE. -RIG UP COIL TUBING CUTTER. -CUT 50'OF COIL AND 50'OF ELINE. 03:20 - 04:15 0.92 RUNCOM P RUNCMP I CLEAR RIG FLOOR. -PICK UP BTT TOOLS FROM GROUND. -LAY DOWN BHI TOOLS TO GROUND. 04:15 - 05:00 0.75 RUNCOM P RUNCMP INSTALL AND TEST NIGHT CAP. -CONFIRM HOLE VOLUME FULL. -DRESS AND REHEAD COIL WITH BTT CTC. -PULL TEST CTC TO 35K. -PRESSURE TEST CTC TO 3,500 PSI. 05:00 - 05:30 0.50 RUNCOM P RUNCMP LOAD 3/4"DRIFT BALL INTO COIL HARD LINE. PUMP BALLAROUNDTHRU COILAND RETRIEVE IN BALL CATCHER. 05:30 - 06:00 0.50 RUNCOM P RUNCMP RIG UP TO RUN LINER. 06:00 - 06:45 0.75 RUNCOM P RUNCMP CREW CHANGE 06:45 - 07:00 0.25 RUNCOM P RUNCMP WALK THROUGH LINER WITH DRILLER,TP, BTT HAND AND WSL 07:00 - 07:15 0.25 RUNCOM P RUNCMP HOLD PJSM TO MU LINER 07:15 - 08:45 1.50 RUNCOM P RUNCMP WE DO NOT HAVE ENOUGH TRUCKS IN THE FLEET TO SUPPORT OUR OPERATIONS WITH 3 RIGS LOOKING TO PUMPING CMT TODAY, PLUS WE HAVE A BLOW THAT IS SUPPOSED TO START AROUND NOON TODAY.WOO TO RUN LINER OR TEST BOPE 08:45 - 09:10 0.42 BOPSUR P RUNCMP PREP TO TEST BOPE BOB NOBLE WITH THE STATE HAS WAIVED WITNESSING OUT TEST 09:10 - 15:00 5.83 BOPSUR P RUNCMP 'HOLE IS FULL,STILL LOOSING-1-2 BPH CLOSE MASTER&SWAB VALVES AND PERFORM LTT TO OPEN THE BOP'S TO INSPECT THE RAMS 09:25 LTT THE MASTER&SWAB 09:30 GOOD TEST,BLEED OFF PRESSURE AND CLOSE THE SSV 09:40 OOA SENSOR ON THE WING TO MONITOR FOR PRESSURE,OPEN THE BOP'S TO INSPECT THE RAMS 15:00 - 16:20 1.33 BOPSUR P RUNCMP FINISHED INSPECTING RAMS,INSTALL TEST PLUG AND INSTALL NIGHT CAP 15:20 FLUID PACK STACK TO SHELL TEST 16:20 - 17:00 0.67 BOPSUR P RUNCMP GOOD SHELL TEST WELL HAS BEEN SHUT IN FIR 7 HRS PULL THE NIGHT CAP AND TEST PLUG, INSTALL THE NIGHT CAP AND TEST OPEN UP TO THE WELLAND FILL THE WELL TO SEE HOW MUCH THE FLUID LEVEL HAS DROPPED CLOSE THE MASTER&SWAB AND LTT REMOVE THE NIGHT CAP,INSTALL THE TEST PLUG THEN CONTINUE TESTING BOPE Printed 2/10/2015 9:06:27AM North America-ALASKA-BP Page 2 of 10 Operation Summary Report Common Well Name:11-30 AFE No Event Type:COM-ONSHORE(CON) Start Date:1/30/2015 End Date:2/4/2015 X3-0164Y-C:(2,503,741.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table ar62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:00 - 17:20 0.33 BOPSUR P RUNCMP WELL TOOK 6 BBLS IN 7 HRS CLOSE MASTER&SWAB VALVES AND LTT REMOVE NIGHT CAP AND INSTALL TEST PLUG 17:.20 - 00:00 6.67 BOPSUR P RUNCMP TEST BOPE AS PER BP,NORDIC AND AOGCC REQUIREMENTS •250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES BOB NOBLE WITH THE STATE WAIVED WITNESS OF THE TEST 1/31/2015 00:00 - 03:00 3.00 BOPSUR P RUNCMP TEST BOPE AS PER BP,NORDIC AND AOGCC REQUIREMENTS 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES BOB NOBLE WITH THE STATE WAIVED WITNESS OF THE TEST BTT,TOURPUSHER AND NIGHT WSL REVIEWED PIPE,COUNT AND TALLIES 03:00 - 03:30 0.50 RUNCOM P RUNCMP HOLD RIG EVACUATION-H2S DRILL FOLLOWED BYAAR-ALL HANDS RESPONDED WELL 03.30 - 04.00 0.50 RUNCOM P RUNCMP PULL TEST PLUG,INSTALL NIGHT CAP AND TEST. OPEN TREE ON CLOSED CHOKE TO NIGHT CAP. CHECK FOR PRESSURE-0 PRESSURE. CHECKED WHITEY VALVE ON NIGHT CAP-WELL ON VACUUM. FILLED WELL-8 BBLS TO FILL. FLOWCHECK WELL-STATIC. PULLED NIGHT CAP. 04:00 - 05:00 1.00 RUNCOM P RUNCMP RIG UP SAFETY JOINT WITH CROSSOVERS TO RUN LINER. PJSM ON RUNNING LINER. 05:00 - 06:00 1.00 RUNCOM P RUNCMP MAKE UP AND RUN IN HOLE WITH 2 7/8" LINER AS PER RUNNING TALLY. 06:00 - 06:30 0.50 RUNCOM P RUNCMP CREW CHANGE HOLE IS FULL STAB FOSV 06:30 - 06:40 0.17 RUNCOM P RUNCMP I WALK THROUGH REMAINING LINER WITH BTT HAND AND DRILLER BEFORE WE GET STARTED 06:40 - 07:00 0.33 RUNCOM P RUNCMP PJSM TO CONTINUE MU LINER 07:00 - 07:25 0.42 RUNCOM P RUNCMP CONTINUE MU LINER DRIFTING FIRST 5 CONNECTIONS 07:25 - 08:00 0.58 RUNCOM P RUNCMP RU HEAD PIN AND FILL LINER WITH MUD 08:00 - 08:50 0.83 RUNCOM P RUNCMP CONTINUE MU LINER 08:50 - 09:25 0.58 RUNCOM P RUNCMP RU HEAD PIN AND FILL LINER WITH MUD LOOSING A LITTLE FLUID WHILE CIRCULATING 09:25 - 10:30 1.08 RUNCOM P RUNCMP CONTINUE MU LINER 10:30 - 11:05 0.58 RUNCOM P RUNCMP RU HEAD PIN AND FILL LINER WITH MUD LOSSES AT 0.85 BPM WHILE CIRCULATING 11:05 - 11:35 0.50 RUNCOM P RUNCMP BRING IN THE 7 JTS OF 3-1/2 LINER 11:35 - 13:10 1.58 RUNCOM P RUNCMP CONTINUE MU LINER 13:10 - 13:50 0.67 RUNCOM P RUNCMP ALL LINER RAN,RU HEAD PIN AND FILL LINER WITH MUD LOSSES AT 1.2 BPM WHILE CIRCULATING WITH 3.5'&2.875 LINER IN THE WELL Printed 2/10/2015 9:06:27AM North America-ALASKA-BP Page 3 of 10 Operation Summary Report Common Well Name:11-30 AFE No Event Type:COM-ONSHORE(CON) Start Date:1/30/2015 End Date:2/4/2015 X3-0164Y-C:(2,503,741.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth I Phase I Description of Operations (hr) (usft) 13:50 - 14:50 1.00 RUNCOM P ' RUNCMP SHUT DOWN PUMP,LOST 27 BBLS DISPLACING AIR OUT OF LINER AND UP THE BACKSIDE. LOOKS LIKE WE HAVE CHARGED UP THE FORMATION WITH THE LOSSES WE HAD WHILE DISPLACING THE LINER WITH MUD. • SHOWING THE SAME TREND START WELLBORE BREATHING FINGERPRINT • • :TREND SHEET START PVT=122 BBLS IN PITS 1 &2 13:51:35 PVT=95 BBLS SHUT DOWN PUMP 13:53:13 PVT=96 BBLS OUT RATE=1.99 BPM 13:55:05 PVT=97 BBLS OUT RATE=0.49 'BPM 13:59:50 PVT=98 BBLS OUT RATE=0.31 BPM MU SEAL ASSEMBLY&PUP JT WHILE MONITORING 14:09:55 PVT=99 BBLS OUT RATE=0.15 BPM NOTIFIED DRLG SUPT 14:18:55 PVT=100 BBLS OUT RATE=0.09 •BPM 14:29:00 PVT=101 BBLS OUT RATE=0.07 • BPM 14:46:50 PVT=101 BBLS OUT RATE=0.00 • BPM MONITOR WELL FOR A FEW MINUTES 14:50 - 15:45 0.92 RUNCOM P RUNCMP NO FLOW FROM WELL,BLEED OFF IS CONSISTENT WITH PREVIOUS WELLBORE BREATHING TRENDS MU LINER RUNNING BHA • 15:45 - 16:05 0.33 RUNCOM P RUNCMP PU THE INJECTOR AND MU TO THE LINER 16:05 - 16:25 0.33 RUNCOM P RUNCMP I PT THE QTS 16:25 16:45 0.33 RUNCOM P RUNCMP GOOD TEST RIH STOP RIH WE ARE NOT GETTING ANY RETURNS BACK SEAL ASSEMBLY IS PUSHING ALL THE FLUID INTO THE FORMATION AND • LEAVING THE TUBING ABOVE THE SEAL ASSEMBLY EMPTY. INCREASE RATE TO 1.0 BPM DOWN THE • COIL,GETTING 0.70 BPM BACK RIH AT 70 FPM AND RETURN RATE DROPPED TO 0.40 RIH AT 100 FPM AND OUT RATE DROPPED TO 0.30 STOP AND FIGURE OUT IF WE HAVE ENOUGH MUD TO GET TO BOTTOM OR REDUCE RIH SPEED TO CONSERVE FLUID 16:45 - 19:30 2.75 RUNCOM P RUNCMP RIH AT 60 FPM AND REDUCE THE PUMP RATE TO 0.80 BPM RETURN RATE IS STEADY AT 0.49 BPM RAN THROUGH THE SSSV PROFILE THE SEAL ASSEMBLY AND LOST ALL RETURNS 100+'BELOW THE SSSV PROFILE AND WE ARE STRUGGLING TO KEEP RETURNS STOP RIH AND LINE UP TO PUMP DOWN THE COIL AND ACROSS THE TOP TO ENSURE THE HOLE IS STAYING FULL 19:30 - 20:00 0.50 RUNCOM P RUNCMP STOP AT FLAG 7300'+4052.42'=11352.42. SHIFT DEPTH TO 11352.42' Printed 2/10/2015 9:06:27AM North America-ALASKA-BP Page 4 of 10 Operation Summary Report Common Well Name:11-30 AFE No Event Type:COM-ONSHORE(CON) Start Date:1/30/2015 End Date:2/4/2015 X3-0164Y-C:(2,503,741.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:00 - 22:30 2.50 RUNCOM P RUNCMP RIH.RIH WEIGHT 16-17K HAD TO FIGHT LINER THROUGH EACH RESTRICTION. TAG BOTTOM MULTIPLE TIMES. NO CHANGE EVERY TIME. PICKED UP TO BREAKOVER AT 14740'UP. PULLED WEIGHT TO 14737' SEALS STUNG INTO SEAL BORE 3'. RIH AND SET 10K DOWN PER BAKER REP. LOAD AND LAUNCH 5/8"STEEL BALL. BALL LANDED AND SHEARED AT 3100#. PICKUP 3'. LINER RELEASED CIIRCULATE 9.5 MUD AT 2.0 BPM IN AND 1.0 BPM 22:30 - 00:00 1.50 RUNCOM P RUNCMP START CIRCULATING 1%SLICK KCL W/ SAFELUBE 2/1/2015 00:00 - 04:30 4.50 RUNCOM P RUNCMP CONTINUE CIRCULATING DRILLING MUD OUT OF HOLE. 1ST CIRCULATION OF KCL DENSITY HEAVY ON BOTTOMS UP. PERFORM 2ND CIRCULATION. ONCE 2ND BOTTOMS UP. DENSITYS IN AND OUT SAME. SLOW RATE TO 1.5 BPM TO GET BASELINE PRESSURE AND LOSS RATE WITH CLEAR FLUID. GETTING ALMOST 96%RETURNS, CALL ODE AND DISCUSS DROPPING EXCESS CEMENT TO 30% PJSM, WITH CEMENT CREWAND EVERYBODY INVOLVED. Printed 2/10/2015 9:06:27AM North America-ALASKA-BP Page 5 of 10 Operation Summary Report Common Well Name:11-30 AFE No Event Type:COM-ONSHORE(CON) Start Date:1/30/2015 End Date:2/4/2015 X3-0164Y-C:(2,503,741.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:30 - 06:50 2.33 RUNCOM P RUNCMP CEMENTERS PT LOW 250#AND HIGH 6300# CALL TO BATCH. CEMENT BATCHED UP TO WEIGHT AT 05:09 AM. CIRCULATING FLUID DURING PT AND BATCHING UP. PUMP 5 BBLS KCL AHEAD OF CEMENT. PUMP 53 BBLS OF CEMENT AT 2 BBLS/MIN AT '2600 PSI,DROPPING DOWN TO 2100 PSI. PUMP 1 BBLS OF KCL WITH CEMENT PUMPS. SWAP OVER TO RIG PUMPS. PUMP POWER PRO CONTAM PILL TO CHASE CEMENT DOWN AT 2 BPM WITH 1.97 BPM RETURNS. STOP AT 109.2 BBLS,PULL UP AT BREAKOVER PLUS 13'(14,732'-PUW=41K). RIH TO 14,744'. LAUNCH PEE-WEE DART. ROLL PUMPS TO 1400 PSI TO SEAT PEE-WEE DART IN WIPER PLUG. PICK UP TO 14,731'TO EXHAUST. PUMP 6 BBLS AT 1.5 BPM TO CONTAMINATE CEMENT ON TOP OF LINER. SET BACK DOWN AND STACK 10 K ON TOP OF LINER. LAUNCH PLUG AT 4,100 PSI. PUMP DISPLACEMENT AT 2.2 BPM @ 3000 PSI WITH RETURN RATE OF 1.7 BPM. 06:37 CEMENT IN PLACE,LWP BUMPED AT 24.0 BBLS ON THE IN MM 0.3 BBLS OVER CALCULATED DISPLACEMENT DISPLACE WITH 24.0 BBLS OF POWER PRO. 44 BBLS BEHIND PIPE ON MICROMOTION-45 BBLS BEHIND PIPE WITH MANUAL STRAP. OPEN BAKER CHOKE TO CHECK FLOATS-GOOD CHECK. CALCULATED TOC IS 11067'MD. 06:50 07:00 0.17 RUNCOM P RUNCMP GOOD NO FLOW FROM FLOATS CLOSE THE BAKER CHOKE,PRESSURE UP TO 2K AS PER BTT HAND PU AND PRESSURE BLED OFF AT 14736', STOP AND PUMP 5 BBLS OF EXHAUST PILL ON TOP OF THE LINER 07:00 - 07:20 0.33 RUNCOM P RUNCMP PU TO CLOSE THE LOWER SLIDING SLEEVE NS HAND DOES NOT THINK WE CLOSED THE LOWER ONE BUT WE DID SEE--4K OVERPULL AT 14563'THAT DRAGGED FOR 2-3'THEN DROPPED OFF WE CANNOT RUN BLACK DOWN LIKE THE OCN WANTS US TO DO BECAUSE THE LINER RUNNING TOOL HAS DOGS STICKING OUT THAT COULD CAUSE PROBLEMS IF WE RAN THEM BACK DOWN THROUGH THE SLIDING SLEEVES.THIS WAS DISCUSSED AT THE LAST MEETING IN TOWN WITH THE NS HANDS BUT NOT SURE IF IT WAS RELAYED TO THE ODE Printed 2/10/2015 9:06:27AM North America-ALASKA-BP Page 6 of 10 Operation Summary Report Common Well Name:11-30 AFE No Event Type:COM-ONSHORE(CON) Start Date:1/30/2015 End Date:2/4/2015 X3-0164Y-C:(2,503,741.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table 662.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 07:20 - 09:00 1.67 RUNCOM P RUNCMP ACCORDING TO THE NS HAND WE DID NOT HAVE ANY CLEAR INDICATION THAT THE SLIDING SLEEVES GOT CLOSED,POOH CONTAMINATING AT NORMAL RETURN RATE OF 0.5 BPM OUT MM DENSITY DROPPED OFF A LITTLE FOR-4 BBLS THEN CLEANED UP,NO READING ON THE GAS METERS IN THE DOGHOUSE OR THE HANDHELD MONITOR 09:00 - 09:10 0.17 RUNCOM P RUNCMP 1 HR LEFT ON THICKENING TIME,STOP AND LINE UP TO SHUT IN THE WELL AT THE CHOKE TO PRESSURE UP THE WELL TO 1000 PSI TO SEE IF THE SLIDING SLEEVES ARE CLOSED IN MM VOL=101 BBLS PRESSURED UP TO 1060 PSI IN 2.2 BBLS, PRESSURE STABILIZED AT 1045 PSI HELP PRESSURE FOR 3 MIN AS PER ODE REQUEST AND LOST-20 PSI,WE EITHER HAVE A GOOD LAP OR THE SLIDING SLEEVES ARE CLOSED 09:10 - 09:50 0.67 RUNCOM P RUNCMP BLEED OFF WHP,SEND TEST INFO TO ODE • AND CONTINUE POOH 09:50 - 10:05 0.25 RUNCOM P l RUNCMP STOP AT 375'AND CIRCULATE UNTIL RETURNS CLEAN UP,OUT DENSITY IS 8.70 PPG RETURNS ARE CLEAN,PUH TO 200'AND FLOW CHECK WELL 10:05 - 10:20 0.25 RUNCOM P RUNCMP !FLOW CHECK WELL 10:20 - 11:00 0.67 RUNCOM P RUNCMP GOOD NO FLOW,TAG UP,REMOVE THE INJECTOR AND LD THE BHA 11:00 - 11:30 0.50 RUNCOM P RUNCMP BHA OOH,LOAD OUT BTT TOOLS FLUID IS STATIC IN THE STACK MONITOR FLUID LEVEL 11:30 - 11:40 0.17 BOPSUR P RUNCMP HOLD A PJSM TO LTT THE MASTER&SWAB VALVES&SWAP VARIABLE RAMS FOR 1-1/4" CSH RAMS 11:40 - 14:30 2.83 BOPSUR P RUNCMP CLOSE THE MASTER&SWAB VALVES AND LTT TO OPEN THE BOP'S AND SWAP RAMS 14:30 - 14:50 0.33 BOPSUR P RUNCMP RU TO SHELL TEST 14:50 - 15:30 0.87 BOPSUR P RUNCMP GOOD SHELL TEST 14:50 TEST THE 1-1/4"RAMS 15:30 - 15:45 0.25 BOPSUR P RUNCMP GOOD TEST ON THE RAMS 15:45 - 16:25 0.67 BOPSUR P RUNCMP TEST THE BAG 16:25 - 16:50 0.42 BOPSUR P RUNCMP GOOD TEST ON BAG MU THE NIGHT CAP AND TEST TOP OPEN UP TO THE WELL 16:50 - 17:15 0.42 BOPSUR P RUNCMP OPEN WELL,NO PRESSURE,FILL ACROSS THE TOP TO ENSURE THE WELL IS FULL AND FLOW CHECK 17:15 - 17:35 0.33 BOPSUR P RUNCMP HOLD PJSM TO MU THE CLEAN OUT LOGGING BHA 17:35 - 18:00 0.42 BOPSUR P RUNCMP PROGRAM RUN TIME INTO TOOL AND LOAD ATLAS TOOLS ON THE RIG 18:00 - 00:00 6.00 BOPSUR , P RUNCMP MU THE MOTOR&MILL 2 JTS THEN THE LOGGING CARRIER AND 128 JTS OF CSH -BREAK CIRCULATION EVERY 40 JOINTS -KICK WHILE TRIPPING DRILL. Printed 2/10/2015 9:06 27AM North America-ALASKA-BP Page 7 of 10 Operation Summary Report Common Well Name:11-30 AFE No Event Type:COM-ONSHORE(CON) Start Date:1/30/2015 End Date:2/4/2015 X3-0164Y-C:(2,503,741.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA I UWI:500292248400 Active datum:Kelly Bushing/Rotary Table c62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/2/2015 00:00 - 02:00 2.00 CLEAN RUNCMP CONTINUE MAKING UP LOGGING/CLEANOUT BHA. -MAKE BAKER SWIVEL TO WORKSTRING -PT QTS LOW/HIGH 02:00 - 04:00 2.00 CLEAN P RUNCMP RIH WITH BHA#12 -CIRCULATING. CIRCULATE A BOTTOMS UP FROM LINER TOP WHILE WE WAIT FOR TOOL TO TURN ON 04:00 - 06:20 2.33 CLEAN P RUNCMP .BAKER RPM TOOL TURNED ON AT 03:43. START LOGGING DOWN AT 30'IMIN 06:20 - 06:40 0.33 CLEAN P RUNCMP STACKING WT STOP AND WT CAME BACK, RIH AND STACKED OUT AGAIN PU TO MAKE SURE THE PU IS CLEAN,PU IS CLEAN •RIH,STACKED OUT AGAIN,REDUCE THE PUMP RATE TO 0.75 BPM AND TRY RIH RIH FINE,WE ARE HYDRAULICING OURSELVES OUT,REDUCE PUMP RATE TO 1.25 BPM AND WE ARE RIH FINE 06.40 - 07:00 0.33 CLEAN P RUNCMP .TAG PBTD AT 14733',PROPOSED PBTD 14726.56',TIE IN CORRECTIONS HAVE BEEN - 1-7 TO-3'SO WITH A-7 CORRECTION WE ARE ON DEPTH PUH SLOW WHILE DRILLER PREPS HIS PITS TO POOH LAYING IN PERF PILL AND DISPLACING WELL TO NEW KCL FOR THE PERF RUN 07:00 - 07:45 0.75 CLEAN.- P RUNCMP START PERF PILL DOWN HOLE 07:45 - 11:40 3.92 CLEAN P RUNCMP 2 BBLS OF PERF PILL OUT,TAG BOTTOM, SET DOWN or,PU TO GET FIRST READING ON CCL THEN START PUMPING LAYING IN PERF PILL TAKE ALL RETURNS OUT TO THE TT _ 11:40 - 12:30 0.83 CLEAN P RUNCMP STOP LOGGING UP AT 10350' PAINT AN EOP FLAG FOR PERF RUN,EOP FLAG=6050' RED,YELLOW&BLUE FILL PITS WITH MORE KCL FLOW CHECK WELL GOOD NO FLOW 12:30 - 13:30 1.00 CLEAN P RUNCMP POOH 13:30 - 13:45 0.25 CLEAN P RUNCMP HOLD PJSM TO PU THE INJECTOR,LD THE UPPER BHA AND LD SINGLE JOINTS OF CSH FLOW CHECK WELL 13:45 - 14:10 0.42 CLEAN P RUNCMP GOOD NO FLOW,TAG UP AND REMOVE THE INJECTOR 14:10 - 14:30 0.33 CLEAN P RUNCMP NORDIC CREW CHANGE,STAB FOSV AND FILL THE HOLE 14:30 - 15:00 0.50 CLEAN P RUNCMP HOLD PJSM TO RU THE HEAD PIN,DROP 1/T BALL TO OPEN THE CIRC SUB AND PULL THE BHA 15:00 - 17:00 2.00 CLEAN ' P RUNCMP START PULLING AND LD THE UPPER BHA AND 58 SINGLES 17:00 - 17:20 0.33 CLEAN P RUNCMP SINGLES LD,PREP TO STBK REMAINING 70 JTS/35 STANDS 17:20 - 18:20 1.00 CLEAN P RUNCMP STBK CSH 18:20 - 19:00 0.67 CLEAN P RUNCMP MARKER JOINT AT THE FLOOR,HOLD PJSM I TO PULL ATLAS TOOLS TO SURFACE Printed 2/10/2015 9.06:27AM • North America-ALASKA-BP Page 8 of 10 Operation Summary Report Common Well Name:11-30 AFE No Event Type:COM-ONSHORE(CON) Start Date:1/30/2015 End Date:2/4/2015 X3-0164Y-C:(2,503,741.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 21:00 2.00 CLEAN P RUNCMP -1/2"BALL RECOVERED. -PJSM, BRING GUNS INTO PIPE SHED. -PREP FLOOR FOR LINER LAP TEST. CREW CHANGE -FINISH LAY DOWN. '21:00 - 21:45 0.75 CLEAN ! P RUNCMP -PERFORM LINER LAP TEST TO 200#LOW AND 2330#HIGH -FIRST 15 MIN LOST 45# -SECOND 15 MIN LOST 22# LINER LAP PASSED LOGS DOWNLOADED AND TIED IN PER GEO'S. +8 CORRECTION. CORRECTED PBTD 14727.38 CORRECTED EOP AT RED/YELLOW/BLUE FLAG=6058.27' 21:45 - 00:00 2.25 PERF P RUNCMP CURRENTLY WAITING ON TOWN GEO'S FOR ORDERS. POSSIBLY BE DROPPING SOME GUNS DO TO GAS -22:30 WORD FROM TOWN GEO TO DROP 80' OF INTERVAL -DISCUSS WITH TCP, AND ODE. DECISION MADE TO DROP(4)GUNS #22425 -MAKE ADJUSTMENTS. PJSM 2/3/2015 00:00 - 04:00 4.00 PERF P RUNCMP .-MAKING UP PERF GUNS -PERF GUNS BELOW FLOOR. START MAKING UP REST OF BHA 04:00 - 06:00 2.00 I PERF P RUNCMP CONTINUE TRIPPING IN HOLE 06:00 - 06:40 0.67 PERF P RUNCMP MU THE INJECTOR TO THE BHA,STAB ON AND TEST THE QTS 06:40 07:50 1.17 PERF P RUNCMP RIH WITH PERF BHA 07:50 09:35 1.75 PERF P RUNCMP STOP AT 10315.02' EOP FLAG AT 6058.27+4251.40=10309.67' -5.35'CORRECTION 09:35 - 10:30 0.92 PERF P RUNCMP RIH AND TD PBTD,TAGGED AT 14726.5' 09:37 PU TO UP WT AND RECORD WT,UP WT =51K 09:39 RETAG,PU AND STOP 5K SHY OF UP WT 09:40 CORRECT DEPTH TO PBTD 14727.4 09:42 PU TO 14616.7',1'BELOW BOTTOM SHOT DEPTH 09:47 STOP AT 14616.7',CLOSE THE CHOKE AND PUMP 1 PRACTICE PUMP CYCLE 09:59 START PUMP SEQUENCE DOWN THE BACKSIDE TO SHOOT LOWER INTERVAL 10:18 PU SLOW TO BOTTOM SHOT DEPTH AND GUNS FIRED ON DEPTH,GOOD SHOT DETECTTION ON TCP EQUIP&CTDS 10:19 ONLINE DOWN THE BACKSIDE HOLDING-200 PSI WHP WHILE PUH TO 2ND INTERVAL PVT=311 BBLS PU TO 14170.9' Printed 2/10/2015 9:06:27AM North America-ALASKA-BP Page 9 of 10 Operation Summary Report Common Well Name: 11-30 AFE No Event Type:COM-ONSHORE(CON) Start Date:1/30/2015 End Date:2/4/2015 X3-0164Y-C:(2,503,741.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table©62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) _ 10:30 - 10:40 0.17 PERF P RUNCMP STOP AT 14170.9'AND BLEED OFF WHP LOST 4 BBLS IN 445',NORMAL DISPLACEMENT SHOULD HAVE BEEN 2.5 BBLS 2ND INTERVAL OF GUNS IS ON TOP OF THE BOTTOM FIRING HEAD,THE LENGTH OF THE FIRING HEAD AND LOWER GUNS=425.22' • 14170.9'-425.22'=13,745.68',1'BELOW BOTTOM SHOT DEPTH FOR UPPER PERF GUNS 10:40 - 12:10 1.50 PERF P RUNCMP START PUMP SEQUENCE TO FIRE UPPER PERF GUNS PVT=307 BBLS LOOSING-0.3 BPM WHILE PUMPING AT 1.5 'BPM DURING EACH PUMP CYCLE 10:52 LAST CYCLE,PU SLOW 10:55 FIRE GUNS ON DEPTH POOH HOLDING 200 PSI WHP PVT=306 BBLS 11:05 LOST 10 BBLS IN 400'REDUCE WHP, PUSHING TO MUCH FLUID AWAY 12:10 - 12:15 0.08 PERF P RUNCMP STOP ABOVE THE TOL,BLEEDOFFWHPAND CHECK LOSS RATE IN RATE=1.21 BPM OUT RATE =1.15 BPM 3.6 BPH WHILE PUMPING 12:15 - 12:20 0.08 PERF P RUNCMP SHUT DOWN PUMP AND FLOW CHECK WELL 12:20 - 13:45 1.42 • PERF P RUNCMP GOOD NO FLOW,POOH WITHOUT WHP 13:45 - 14:00 0.25 PERF P RUNCMP HOLD PJSM TO REMOVE THE INJECTOR, PUMP FRESH WATER INTO THE BHA AND LD THE UPPER BHA AND CSH 14:00 - 17:15 3.25 PERF P RUNCMP PU THE INJECTOR,PUMP FRESH WATER AND LD THE BHA 17:15 - 18:00 0.75 PERF P RUNCMP AT THE MARKER JOINT,TCP ENGINEER IS ON THE FLOOR,CONTINUE PULLING THE LAST 10 JTS OF CSH 18:00 - 18:30 0.50 PERF P RUNCMP STOP PULLING WITH 1 JT LEFT IN THE HOLE FOR CREW CHANGE 18:30 - 18:45 0.25 PERF P RUNPRD HOLD PJSM TO PULL GUNS TO THE RIG FLOOR 18:45 - 00:00 5.25 PERF P RUNPRD I CONTINUE PULLING PERF BHA PULL SPENT GUNS FROM WELL;ALL GUNS FIRED CLEAN AND CLEAR RIG FLOOR;PREP FOR NOZZLE RUN 2/4/2015 00:00 - 00:10 0.17 CLEAN P POST MU FREEZE PROTECT BHA WITH 2'SWIZZLE AND DUAL CHECK SUB 00:10 - 00:30 0.33 CLEAN P POST STAB ON INJECTOR AND PRESSURE TEST QTS TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES 00:30 - 01:00 0.50 CLEAN P POST RIH TO 2500'WITH FREEZE PROTECT BHA AND SPOT DIESEL TO NOZZLE 01:00 - 01:30 0.50 CLEAN P POST POH,DISPLACING 2500'TO SURFACE WITH DIESEL TAG UP AND GREESE TREE VALVES 01:30 - 01:45 . 0.25 CLEAN P POST FLOW CHECK,POP OFF INJECTOR AND LD FREEZE PROTECT BHA 01:45 - 02:15 0.50 DHB P POST HOLD PJSM WITH DSM AND INTALLTWC Printed 2/10/2015 9.06:27AM • North America-ALASKA-BP Page 10 of 10 Operation Summary Report Common Well Name:11-30 AFE No Event Type:COM-ONSHORE(CON) Start Date:1/30/2015 End Date:2/4/2015 X3-0164Y-C:(2,503,741.00) Project:Prudhoe Bay Site:PB DS 11 Rig Name/No.:NORDIC 1 Spud Date/Time:5/22/1994 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292248400 Active datum:Kelly Bushing/Rotary Table @62.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:15 - 03:30 1.25 DHB P POST FILL TREE WITH McOH,STAB ON INJECTOR, TEST QTS TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES AND LTT PER OCN#10. MAINTAIN 3500 PSI THROUGH THE WING VALVE WITH THE TEST PUMP 03:30 - 06:00 2.50 DEMOB P POST HOLD PJSM FOR HIGH PRESSURE TESTING AND N2 BLOWDOWN PRESSURE TEST HARDLINE TO N2 TANK TO 250 PSI LOW/4000 PSI HIGH FOR 5 MINUTES PUMP 40 BBLS WATER,15 BBLS CORROSION INHIBITOR,10 BBLS McOH AND BEGIN N2 BLOWDOWN,TAKING RETURNS TO FLOWBACK TANK 06:00 - 07:00 1.00 DEMOB P POST CREW CHANGE 07:00 - 07:15 0.25 DEMOB P POST HOLD PJSM TO PREP COIL TO UNSTABAND SECURE AT THE REEL 07:15 - 08:30 1.25 DEMOB P POST PU THE INJECTOR,RD THE CTC&SWIVEL PREP THE COIL FOR THE GRAPPLE INSTALL THE GRAPPLE 08:30 - 11:30 3.00 DEMOB P POST PULL TEST THE GRAPPLE TO 5K,4 PULLS TEHN RETIGHTEN PULL COIL BACK TO THE REEL SECURE COIL AT THE REEL CUT OFF GRAPPLE REMOVE HARDLINE - — LOWER REEL 11:30 - 12:00 0.50 DEMOB P POST REEL LOWERED AND MOVED OUT 12:00 - 15:00 3.00 DEMOB N MISC POST CTS NEEDS A WELDER TO COME OUT AND REWELD A CRACKED BEAD ON A DRIVE PIN 15:00 - 19:00 4.00 DEMOB P POST REPAIRS COMPLETED,HOLD PJSM TO LOAD NEW REEL HAD TO LOWER REEL TO CUT OFF-1'OF COIL TO FIT THROUGH THE BOMB BAY DOOR PULL TEST GRAPPLE,PULL COIL ACROSS FLOOR AND STAB COIL 19:00 - 21:15 2.25 BOPSUR P POST CREW CHANGE,HOLD PJSM AND VERIFY BARRIERS IN PLACE CLEAN AND CLEAR RIG FLOOR,RU AND ND BOP 21:15 - 00:00 2.75 BOPSUR P POST NU TREE CAP PRESSURE TEST TREE CAP TO 250 PSI LOW/ 3500 PSI HIGH FOR 5 MINUTES !RIG DOWN TEST EQUIPMENT AND HOLD PJSM FOR RIG MOVE WITH NORDIC CREW AND SUPERINTENDANT "'RELEASE RIG TO F-39 AT 23:59"' Printed 2/10/2015 9:06:27AM Qbp North America - ALASKA - BP Prudhoe Bay PB DS 11 11-30 - Slot 30 500292248400 11-30A Design: 11-30A Survey Report - Geographic 30 January, 2015 • Øbp Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 11-30-Slot 30 Project: Prudhoe Bay TVD Reference: Kelly Bushing/Rotary Table @ 62.40usft(NABORS 4E. , Site: PB DS 11 MD Reference: Kelly Bushing/Rotary Table @ 62.40usft(NABORS 4E Well: 11-30 North Reference: True - Wellbore: 11-30A Survey Calculation Method: Minimum Curvature • Design: 11-30A Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) ' System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) - Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 11,TR-11-15 Site Position: Northing: 5,949,527.78 usft Latitude: 70°15'55.850 N From: Map Easting: 707,585.65usft Longitude: 148°19'17.13 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.58 ° Well 11-30 API No. 500292248400 Well Position +N/-S 0.00 usft Northing: 5,952,898.81 usft . Latitude: 70°16'29.115 N +E/-W 0.00 usft Easting: 707,134.58 usft - Longitude: 148°19'27.56 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 27.20 usft - Wellbore 11-30A API no. 500292248401 Magnetics Model Name Sample Date Declination Dip Angle Field Strength 1 (°1 (°) (nT) BGGM2014 8/12/2014 19.86 81.03 57,612 Design 11-30A Audit Notes: Version: Phase: ACTUAL Tie On Depth: 11,463.00 Vertical Section: Depth From(TVD) +N/-5 +E/-W Direction (usft) (usft) (usft) (°) 34.40 0.00 0.00 317.27 Survey Program Date: 1/30/2015 From To (usft) (usft) Survey(Wellbore) Tool Name Description 145.00 11,463.00 1 :MWD-Standard(11-30) MWD MWD-Standard 11,504.50 14,728.29 CoilTrak MWD(11-30A) MWD MWD-Standard 1/30/2015 9:25:51AM Page 2 COMPASS 5000.1 Build 61 . bp Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 11-30-Slot 30 Project: Prudhoe Bay TVD Reference: Kelly Bushing/Rotary Table @ 62.40usft(NABORS 4E Site: PB DS 11 MD Reference: Kelly Bushing/Rotary Table @ 62.40usft(NABORS 4E Well: 11-30 North Reference: True Wellbore: 11-30A Survey Calculation Method: Minimum Curvature Design: 11-30A Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) n (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 34.40 0.00 0.00 34.40 0.00 0.00 5,952,898.81 707,134.58 70°16'29.115 N 148°19'27.56 W 145.00 0.30 96.60 145.00 -0.03 0.29 5,952,898.78 707,134.86 70°16'29.115 N 148°19'27.55 W 238.00 0.40 114.10 238.00 -0.19 0.83 5,952,898.64 707,135.41 70°16'29.113 N 148°19'27.53 W 328.00 0.70 143.90 327.99 -0.77 1.44 5,952,898.08 707,136.03 70°16'29.108 N 148°19'27.52 W 418.00 0.70 150.90 417.99 -1.69 2.03 5,952,897.17 707,136.65 70°16'29.099 N 148°19'27.50 W 508.00 0.60 4.60 507.98 -1.70 2.33 5,952,897.17 707,136.95 70°16'29.098 N 148°19'27.49 W 598.00 3.80 352.60 597.91 1.73 1.99 5,952,900.59 707,136.51 70°16'29.132 N 148°19'27.50 W 688.00 6.20 351.50 687.56 9.49 0.88 5,952,908.32 707,135.20 70°16'29.208 N 148°19'27.53 W 778.00 6.80 351.50 776.98 19.57 -0.62 5,952,918.35 707,133.42 70°16'29.308 N 148°19'27.58 W 872.00 6.30 350.10 870.37 30.15 2.33 5,952,928.88 707,131.42 70°16'29.412 N 148°19'27.62 W 967.00 6.40 345.50 964.78 40.41 -4.55 5,952,939.08 707,128.91 70°16'29.513 N 148°19'27.69 W 1,063.00 6.80 345.60 1,060.15 51.10 -7.31 5,952,949.68 707,125.87 70°16'29.618 N 148°19'27.77 W 1,158.00 8.10 346.50 1,154.34 63.05 -10.27 5,952,961.55 707,122.58 70°16'29.735 N 148°19'27.86 W 1,253.00 10.10 350.00 1,248.14 77.77 -13.28 5,952,976.18 707,119.16 70°16'29.880 N 148°19'27.94 W 1,348.00 10.60 343.50 1,341.60 94.35 -17.20 5,952,992.64 707,114.78 70°16'30.043 N 148°19'28.06 W 1,444.00 10.90 337.30 1,435.92 111.19 -23.22 5,953,009.31 707,108.31 70°16'30.209 N 148°19'28.23 W 1,538.00 11.10 342.20 1,528.19 128.00 -29.41 5,953,025.95 707,101.65 70°16'30.374 N 148°19'28.41 W 1,634.00 12.10 341.40 1,622.23 146.34 -35.45 5,953,044.11 707,095.12 70°16'30.554 N 148°19'28.59 W 1,729.00 13.70 345.10 1,714.83 166.65 -41.51 5,953,064.24 707,088.49 70°16'30.754 N 148°19'28.77 W 1,825.00 14.00 345.40 1,808.04 188.87 -47.37 5,953,086.30 707,082.03 70°16'30.973 N 148°19'28.94 W 1,920.00 14.40 347.00 1,900.14 211.50 -52.92 5,953,108.76 707,075.86 70°16'31.195 N 148°19'29.10 W I 2,015.00 15.20 345.40 1,991.99 235.07 -58.72 5,953,132.16 707,069.41 70°16'31.427 N 148°19'29.27 W 2,110.00 17.00 345.20 2,083.26 260.55 -65.40 5,953,157.44 707,062.03 70°16'31.678 N 148°19'29.46 W 2,206.00 17.60 344.70 2,174.91 288.11 -72.82 5,953,184.79 707,053.86 70°16'31.949 N 148°19'29.68 W 2,301.00 17.80 344.30 2,265.42 315.95 -80.54 5,953,212.40 707,045.38 70°16'32.222 N 148°19'29.90 W 2,396.00 18.70 341.00 2,355.64 344.33 -89.42 5,953,240.52 707,035.71 70°16'32.502 N 148°19'30.16 W 2,491.00 22.60 334.30 2,444.53 375.19 -102.31 5,953,271.02 707,021.99 70°16'32.805 N 148°19'30.54 W 2,587.00 19.90 335.20 2,534.00 406.65 -117.16 5,953,302.06 707,006.27 70°16'33.115 N 148°19'30.97 W 2,681.00 20.50 338.40 2,622.22 436.48 -129.93 5,953,331.52 706,992.69 70°16'33.408 N 148°19'31.34 W 2,777.00 22.50 341.50 2,711.53 469.53 -141.95 5,953,364.23 706,979.76 70°16'33.733 N 148°19'31.69 W 2,872.00 25.70 345.10 2,798.25 506.69 -153.02 5,953,401.06 706,967.68 70°16'34.098 N 148°19'32.01 W 2,967.00 24.80 347.20 2,884.17 546.02 -162.73 5,953,440.12 706,956.89 70°16'34.485 N 148°19'32.30 W 3,062.00 25.30 345.10 2,970.24 585.07 -172.36 5,953,478.88 706,946.18 70°16'34.869 N 148°19'32.58 W 3,157.00 27.70 345.80 3,055.25 626.10 -183.00 5,953,519.60 706,934.42 70°16'35.273 N 148°19'32.89 W 3,253.00 30.30 346.10 3,139.21 671.24 194.29 5,953,564.42 706,921.89 70°16'35.717 N 148°19'33.21 W 3,348.00 32.40 344.20 3,220.33 719.00 -206.98 5,953,611.81 706,907.89 70°16'36.187 N 148°19'33.58 W 3,444.00 34.00 342.90 3,300.66 769.41 -221.88 5,953,661.78 706,891.61 70°16'36.682 N 148°19'34.02 W 3,539.00 35.80 342.20 3,378.57 821.26 -238.18 5,953,713.16 706,873.89 70°16'37.192 N 148°19'34.49 W 3,634.00 37.00 339.80 3,455.04 874.55 -256.55 5,953,765.92 706,854.06 70°16'37.716 N 148°19'35.03 W 3,730.00 38.50 337.80 3,530.95 929.33 -277.82 5,953,820.09 706,831.30 70°16'38.255 N 148°19'35.65 W I 3,824.00 40.00 336.60 3,603.74 984.15 -300.87 5,953,874.25 706,806.74 70°16'38.794 N 148°19'36.32 W' 3,917.00 41.20 334.00 3,674.36 1,039.11 -326.17 5,953,928.50 706,779.94 70°16'39.335 N 148°19'37.06 W 4,051.00 41.10 333.60 3,775.26 1,118.23 -365.10 5,954,006.51 706,738.85 70°16'40.113 N 148°19'38.19 W 4,147.00 41.80 330.40 3,847.22 1,174.32 -394.94 5,954,061.75 706,707.48 70°16'40.664 N 148°19'39.06 W 4,242.00 43.80 330.30 3,916.92 1,230.41 -426.87 5,954,116.94 706,674.02 70°16'41.216 N 148°19'39.99 W 4,338.00 46.10 330.10 3,984.86 1,289.26 -460.58 5,954,174.84 706,638.71 70°16'41.795 N 148°19'40.97 W 4,433.00 47.50 327.80 4,049.89 1,348.57 -496.30 5,954,233.14 706,601.36 70°16'42.378 N 148°19'42.01 W 4,529.00 48.70 328.10 4,114.00 1,409.14 -534.22 5,954,292.63 706,561.80 70°16'42.974 N 148°19'43.11 W 4,623.00 50.40 330.40 4,174.99 1,470.61 -570.77 5,954,353.07 706,523.57 70°16'43.578 N 148°19'44.18 W 4,719.00 51.20 330.40 4,235.67 1,535.29 -607.52 5,954,416.72 706,485.06 70°16'44.214 N 148°19'45.25 W 4,814.00 49.80 332.20 4,296.09 1,599.58 -642.73 5,954,480.01 706,448.10 70°16'44.847 N 148°19'46.28 W 4,909.00 48.60 334.70 4,358.17 1,663.90 -674.88 5,954,543A1 706,414.19 70°16'45.479 N 148°19'47.21 W 5,004.00 49.00 331.30 4,420.76 1,727.56 -707.33 5,954,606.16 706,380.00 70°16'46.105 N 148°19'48.16 W 5,100.00 50.00 331.60 4,483.11 1,791.69 -742.21 5,954,669.29 706,343.36 70°16'46.736 N 148°19'49.17 W 5,195.00 50.50 331.00 4,543.85 1,855.75 -777.29 5,954,732.36 706,306.54 70°16'47.366 N 148°19'50.20 W 1/30/2015 9:25:51AM Page 3 COMPASS 5000.1 Build 61 • 0 bp Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 11-30-Slot 30 Project: Prudhoe Bay TVD Reference: Kelly Bushing/Rotary Table @ 62.4ousft(NABORS 4E Site: PB DS 11 MD Reference: Kelly Bushing/Rotary Table @ 62.4ousft(NABORS 4E Well: 11-30 North Reference: True Wellbore: 11-30A Survey Calculation Method: Minimum Curvature Design: 11-30A Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 5,290.00 50.20 332.50 4,604.47 1,920.18 -811.91 5,954,795.81 706,270.16 70°16'48.000 N 148°19'51.20 W 5,386.00 50.70 332.50 4,665.60 1,985.84 -846.09 5,954,860.50 706,234.19 70°16'48.645 N 148°19'52.20 W 5,481.00 50.80 333.20 4,725.71 2,051.30 -879.66 5,954,925.01 706,198.83 70°16'49.289 N 148°19'53.18 W 5,575.00 50.50 333.10 4,785.31 2,116.15 -912.49 5,954,988.93 706,164.23 70°16'49.927 N 148°19'54.13 W 5,671.00 49.30 332.40 4,847.15 2,181.43 -946.11 5,955,053.26 706,128.83 70°16'50.569 N 148°19'55.11 W 5,767.00 49.00 332.90 4,909.94 2,245.93 -979.47 5,955,116.81 706,093.70 70°16'51.203 N 148°19'56.08 W 5,861.00 49.00 333.20 4,971.61 2,309.17 -1,011.62 5,955,179.14 706,059.83 70°16'51.825 N 148°19'57.02 W 5,955.00 49.90 333.80 5,032.72 2,373.09 -1,043.49 5,955,242.15 706,026.21 70°16'52.454 N 148°19'57.95 W 6,051.00 51.40 332.50 5,093.59 2,439.32 -1,077.02 5,955,307.43 705,990.87 70°16'53.105 N 148°19'58.93 W 6,147.00 51.60 332.00 5,153.35 2,505.80 -1,112.01 5,955,372.92 705,954.07 70°16'53.759 N 148°19'59.95 W 6,243.00 52.00 332.70 5,212.72 2,572.63 -1,147.01 5,955,438.76 705,917.24 70°16'54.416 N 148°20'0.97 W 6,337.00 51.40 332.90 5,270.97 2,638.24 -1,180.73 5,955,503.41 705,881.73 70°16'55.061 N 148°20'1.95 W 6,433.00 50.90 332.40 5,331.19 2,704.65 -1,215.08 5,955,568.84 705,845.57 70°16'55.714 N 148°20'2.95 W 6,529.00 50.40 331.00 5,392.07 2,770.01 -1,250.27 5,955,633.21 705,808.59 70°16'56.357 N 148°20'3.97 W 6,624.00 51.30 331.30 5,452.04 2,834.54 -1,285.82 5,955,696.73 705,771.29 70°16'56.992 N 148°20'5.01 W 6,720.00 51.50 331.80 5,511.94 2,900.50 -1,321.56 5,955,761.68 705,733.75 70°16'57.640 N 148°20'6.05 W 6,815.00 50.50 332.90 5,571.72 2,965.90 -1,355.82 5,955,826.11 705,697.70 70°16'58.283 N 148°20'7.05 W 6,910.00 50.30 332.90 5,632.28 3,031.06 -1,389.17 5,955,890.32 705,662.57 70°16'58.924 N 148°20'8.02 W 7,006.00 50.60 334.80 5,693.41 3,097.50 -1,421.79 5,955,955.84 705,628.14 70°16'59.578 N 148°20'8.97 W 7,102.00 50.50 333.60 5,754.41 3,164.24 -1,454.05 5,956,021.66 705,594.05 70°17'0.234 N 148°20'9.91 W 7,196.00 49.90 331.50 5,814.58 3,228.32 -1,487.33 5,956,084.80 705,559.02 70°17'0.864 N 148°20'10.88 W 7,293.00 48.60 331.30 5,877.90 3,292.84 -1,522.51 5,956,148.32 705,522.09 70°17'1.499 N 148°20'11.91 W 7,389.00 48.30 329.70 5,941.58 3,355.36 -1,557.88 5,956,209.85 705,485.01 70°17'2.113 N 148°20'12.94 W 7,484.00 49.20 331.70 6,004.22 3,417.65 -1,592.82 5,956,271.14 705,448.36 70°17'2.726 N 148°20'13.96 W 7,579.00 49.50 331.10 6,066.10 3,480.93 -1,627.32 5,956,333.45 705,412.13 70°17'3.348 N 148°20'14.96 W 7,675.00 48.50 329.90 6,129.09 3,543.99 -1,663.00 5,956,395.50 705,374.74 70°17'3.968 N 148°20'16.00 W 7,770.00 48.60 330.80 6,191.97 3,605.87 -1,698.22 5,956,456.38 705,337.83 70°17'4.577 N 148°20'17.03 W 7,866.00 49.20 331.30 6,255.08 3,669.17 -1,733.23 5,956,518.69 705,301.09 70°17'5.199 N 148°20'18.05 W 7,961.00 49.00 331.20 6,317.28 3,732.13 -1,767.77 5,956,580.67 705,264.83 70°17'5.818 N 148°20'19.06 W 8,056.00 48.90 328.50 6,379.68 3,794.07 -1,803.75 5,956,641.59 705,227.17 70°17'6.428 N 148°20'20.10 W 8,151.00 49.10 329.60 6,442.00 3,855.56 -1,840.62 5,956,702.04 705,188.62 70°17'7.032 N 148°20'21.18 W 8,246.00 49.40 329.60 6,504.01 3,917.63 -1,877.04 5,956,763.08 705,150.51 70°17'7.643 N 148°20'22.24 W 8,341.00 49.10 329.60 6,566.03 3,979.70 -1,913.46 5,956,824.13 705,112.39 70°17'8.253 N 148°20'23.30 W 8,437.00 48.30 330.40 6,629.39 4,042.16 -1,949.52 5,956,885.56 705,074.63 70°17'8.867 N 148°20'24.35 W 8,533.00 48.10 329.90 6,693.37 4,104.23 -1,985.14 5,956,946.63 705,037.32 70°17'9.478 N 148°20'25.39 W 8,628.00 48.40 329.90 6,756.63 4,165.55 -2,020.68 5,957,006.94 705,000.10 70°17'10.081 N 148°20'26.43 W 8,723.00 48.80 329.90 6,819.46 4,227.20 -2,056.42 5,957,067.58 704,962.68 70°17'10.687 N 148°20'27.47 W 8,817.00 49.10 330.60 6,881.19 4,288.75 -2,091.60 5,957,128.13 704,925.82 70°17'11.292 N 148°20'28.49 W 8,911.00 50.00 327.60 6,942.18 4,350.10 -2,128.33 5,957,188.45 704,887.41 70°17'11.895 N 148°20'29.56 W 9,006.00 50.70 325.50 7,002.80 4,411.12 -2,168.65 5,957,248.34 704,845.43 70°17'12.495 N 148°20'30.74 W 9,099.00 52.20 326.40 7,060.76 4,471.39 -2,209.37 5,957,307.45 704,803.07 70°17'13.088 N 148°20'31.93 W 9,193.00 53.40 323.40 7,117.60 4,532.62 -2,252.43 5,957,367.48 704,758.35 70°17'13.690 N 148°20'33.18 W 9,288.00 54.20 322.30 7,173.71 4,593.72 -2,298.73 5,957,427.28 704,710.39 70°17'14.291 N 148°20'34.53 W 9,381.00 54.60 322.50 7,227.85 4,653.63 -2,344.86 5,957,485.89 704,662.62 70°17'14.880 N 148°20'35.88 W 9,476.00 54.90 320.40 7,282.68 4,714.30 -2,393.21 5,957,545.20 704,612.63 70°17'15.476 N 148°20'37.28 W 9,571.00 55.40 321.60 7,336.97 4,774.89 -2,442.27 5,957,604.41 704,561.92 70°17'16.072 N 148°20'38.71 W 9,665.00 56.00 318.30 7,389.95 4,834.31 -2,492.23 5,957,662.43 704,510.35 70°17'16.656 N 148°20'40.17 W 9,758.00 57.60 318.30 7,440.87 4,892.41 -2,543.99 5,957,719.09 704,457.00 70°17'17.228 N 148°20'41.68 W 9,851.00 58.40 319.70 7,490.15 4,951.93 -2,595.73 5,957,777.16 704,403.65 70°17'17.813 N 148°20'43.19 W 9,944.00 58.50 322.30 7,538.82 5,013.52 -2,645.60 5,957,837.34 704,352.11 70°17 18.418 N 148°20'44.64 W 10,039.00 58.60 320.20 7,588.39 5,076.72 -2,696.32 5,957,899.12 704,299.67 70°17'19.040 N 148°20'46.12 W 10,134.00 58.60 319.90 7,637.89 5,138.88 -2,748.39 5,957,959.82 704,245.91 70°17 19.651 N 148°20'47.64 W 10,228.00 58.80 320.90 7,686.72 5,200.76 -2,799.59 5,958,020.27 704,193.03 70°17'20.259 N 148°20'49.13 W 10,323.00 58.50 319.70 7,736.15 5,263.18 -2,851.41 5,958,081.24 704,139.52 70°17'20.873 N 148°20'50.64 W I 10,419.00 58.10 319.70 7,786.59 5,325.48 -2,904.24 5,958,142.05 704,085.00 70°17'21.486 N 148°20'52.18 W 1/30/2015 9:25:51AM Page 4 COMPASS 5000.1 Build 61 0 bp Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 11-30-Slot 30 Project: Prudhoe Bay TVD Reference: Kelly Bushing/Rotary Table @ 62.40usft(NABORS 4E Site: PB DS 11 MD Reference: Kelly Bushing/Rotary Table @ 62.40usft(NABORS 4E Well: 11-30 North Reference: True Wellbore: 11-30A Survey Calculation Method: Minimum Curvature Design: 11-30A Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +El-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 10,514.00 57.90 320.20 7,836.94 5,387.15 -2,956.08 5,958,202.27 704,031.48 70°17 22.092 N 148°20'53.69 W 10,608.00 57.70 321.30 7,887.03 5,448.74 -3,006.40 5,958,262.45 703,979.48 70°17 22.697 N 148°20'55.16 W 10,703.00 57.40 320.80 7,938.00 5,511.09 -3,056.80 5,958,323.38 703,927.39 70°17'23.310 N 148°20'56.63 W 10,797.00 57.30 321.20 7,988.72 5,572.60 -3,106.61 5,958,383.49 703,875.91 70°17'23.915 N 148°20'58.08 W 10,891.00 57.00 321.61 8,039.71 5,634.32 -3,155.87 5,958,443.83 703,824.97 70°17 24.522 N 148°20'59.52 W 10,985.00 56.70 320.60 8,091.11 5,695.57 -3,205.28 5,958,503.69 703,773.89 70°17 25.124 N 148°21'0.96 W 11,079.00 56.30 321.30 8,142.99 5,756.44 -3,254.66 5,958,563.18 703,722.86 70°17'25.723 N 148°21'2.40 W 11,173.00 56.30 321.10 8,195.15 5,817.39 -3,303.67 5,958,622.75 703,672.20 70°17'26.322 N 148°21'3.82 W 11,268.00 56.30 320.20 8,247.86 5,878.50 -3,353.78 5,958,682.46' 703,620.43 70°17'26.923 N 148°21'5.29 W 11,333.00 56.30 321.60 8,283.92 5,920.47 -3,387.88 5,958,723.47 703,585.18 70°17'27.335 N 148°21'6.28 W 11,463.00 57.45 322.91 8,354.97 6,006.56 -3,454.52 5,958,807.69 703,516.20 70°17'28.182 N 148°21'8.22 W TIP 11,504.50 57.62 322.02 8,377.24 6,034.32 -3,475.85 5,958,834.86 703,494.12 70°17'28.455 N 148°21'8.85 W KOP 11,529.88 56.44 321.00 8,391.05 6,050.99 -3,489.10 5,958,851.15 703,480.41 70°17'28.619 N 148°21'9.23 W Interpolated Azimuth 11,560.29 54.24 318.00 8,408.35 6,070.01 -3,505.34 5,958,869.72 703,463.66 70°17'28.806 N 148°21'9.70 W Interpolated Azimuth 11,590.15 51.92 314.00 8,426.29 6,087.18 -3,521.90 5,958,886.43 703,446.63 70°17'28.974 N 148°21'10.19 W Interpolated Azimuth 11,620.17 50.02 311.00 8,445.20 6,102.94 -3,539.09 5,958,901.70 703,429.02 70°17'29.129 N 148°21'10.69 W Interpolated Azimuth 11,653.30 48.39 309.97 8,466.84 6,119.23 -3,558.16 5,958,917.46 703,409.51 70°17'29.289 N 148°21'11.24 W 11,679.78 47.36 310.25 8,484.60 6,131.88 -3,573.18 5,958,929.69 703,394.14 70°17'29.414 N 148°21'11.68 W 11,709.65 47.47 306.48 8,504.82 6,145.52 -3,590.42 5,958,942.86 703,376.54 70°17'29.548 N 148°21'12.19 W 11,739.64 46.59 301.02 8,525.27 6,157.71 -3,608.65 5,958,954.54 703,357.98 70°17'29.668 N 148°21'12.72 W 11,769.68 47.16 295.46 8,545.81 6,168.07 -3,627.95 5,958,964.36 703,338.40 70°17'29.769 N 148°21'13.28 W 11,799.70 47.39 290.00 8,566.19 6,176.59 -3,648.28 5,958,972.31 703,317.85 70°17'29.853 N 148°21'13.87 W 11,829.61 48.20 284.96 8,586.29 6,183.23 -3,669.40 5,958,978.37 703,296.55 70°17'29.918 N 148°21'14.49 W 11,858.78 48.49 278.84 8,605.69 6,187.72 -3,690.71 5,958,982.27 703,275.13 70°17'29.962 N 148°21'15.11 W 11,890.26 48.82 274.01 8,626.49 6,190.36 -3,714.18 5,958,984.27 703,251.60 70°17'29.988 N 148°21'15.79 W 11,921.99 49.09 268.66 8,647.33 6,190.92 -3,738.09 5,958,984.16 703,227.68 70°17'29.994 N 148°21'16.49 W 11,949.58 50.45 261.81 8,665.16 6,189.16 -3,759.05 5,958,981.83 703,206.78 70°17'29.976 N 148°21'17.10 W 11,980.80 53.67 258.77 8,684.36 6,184.99 -3,783.31 5,958,977.00 703,182.64 70°17'29.935 N 148°21'17.81 W 12,009.62 56.38 255.81 8,700.88 6,179.79 -3,806.34 5,958,971.16 703,159.77 70°17'29.884 N 148°21'18.48 W 12,040.09 59.56 253.67 8,717.04 6,172.98 -3,831.25 5,958,963.67 703,135.05 70°17'29.817 N 148°21'19.20 W 12,069.46 63.84 252.89 8,730.96 6,165.54 -3,856.01 5,958,955.55 703,110.51 70°17'29.743 N 148°21'19.93 W 12,099.77 68.23 250.95 8,743.27 6,156.94 -3,882.33 5,958,946.23 703,084.44 70°17'29.659 N 148°21'20.69 W 12,129.68 72.08 250.29 8,753.42 6,147.60 -3,908.86 5,958,936.17 703,058.17 70°17'29.567 N 148°21'21.47 W 12,161.62 76.11 247.64 8,762.18 6,136.57 -3,937.52 5,958,924.36 703,029.83 70°17'29.458 N 148°21'22.30 W 12,189.56 80.08 245.35 8,767.94 6,125.67 -3,962.58 5,958,912.77 703,005.08 70°17'29.351 N 148°21'23.03 W 12,221.42 82.58 242.82 8,772.74 6,111.90 -3,990.91 5,958,898.23 702,977.15 70°17'29.215 N 148°21'23.86 W 12,253.08 84.89 239.80 8,776.20 6,096.80 -4,018.51 5,958,882.37 702,949.97 70°17'29.066 N 148°21'24.66 W 12,279.58 85.02 236.41 8,778.53 6,082.85 -4,040.92 5,958,867.81 702,927.96 70°17'28.929 N 148°21'25.31 W 12,309.90 86.19 232.79 8,780.85 6,065.34 -4,065.55 5,958,849.63 702,903.81 70°17'28.757 N 148°21'26.03 W 12,340.22 86.56 234.42 8,782.77 6,047.39 -4,089.91 5,958,831.01 702,879.96 70°17'28.580 N 148°21'26.74 W 12,370.79 89.05 238.78 8,783.94 6,030.58 -4,115.41 5,958,813.51 702,854.94 70°17'28.415 N 148°21'27.48 W 12,400.44 90.15 242.86 8,784.15 6,016.13 -4,141.29 5,958,798.35 702,829.47 70°17'28.272 N 148°21'28.24 W 12,431.62 88.22 243.49 8,784.59 6,002.06 -4,169.11 5,958,783.52 702,802.05 70°17'28.134 N 148°21'29.05 W 12,460.52 85.51 246.15 8,786.17 5,989.78 -4,195.22 5,958,770.53 702,776.29 70°17 28.013 N 148°21'29.81 W 12,490.78 87.30 250.25 8,788.07 5,978.57 -4,223.25 5,958,758.56 702,748.57 70°17'27.903 N 148°21'30.62 W 12,520.90 90.06 253.77 8,788.76 5,969.27 -4,251.88 5,958,748.47 702,720.21 70°17'27.811 N 148°21'31.46 W 12,550.78 91.29 258.34 8,788.41 5,962.08 -4,280.87 5,958,740.48 702,691.43 70°17'27.740 N 148°21'32.30 W 12,580.72 90.86 261.74 8,787.85 5,956.90 -4,310.35 5,958,734.49 702,662.11 70°17'27.689 N 148°21'33.16 W 1/30/2015 9:25:51AM Page 5 COMPASS 5000.1 Build 61 ( bp Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 11-30-Slot 30 Project: Prudhoe Bay ND Reference: Kelly Bushing/Rotary Table @ 62.40usft(NABORS 4E Site: PB DS 11 MD Reference: Kelly Bushing/Rotary Table @ 62.40usft(NABORS 4E Well: 11-30 North Reference: True Wellbore: 11-30A Survey Calculation Method: Minimum Curvature Design: 11-30A Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (0) (0) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 12,609.60 87.48 265.10 8,788.27 5,953.59 -4,339.03 5,958,730.40 702,633.53 70°17'27.656 N 148°21'34.00 W 12,642.10 85.58 266.62 8,790.24 5,951.25 -4,371.38 5,958,727.17 702,601.26 70°17'27.633 N 148°21'34.94 W 12,670.78 89.08 268.68 8,791.57 5,950.07 -4,400.00 5,958,725.21 702,572.68 70°17'27.621 N 148°21'35.77 W 12,701.06 89.66 273.55 8,791.90 5,950.66 -4,430.26 5,958,724.96 702,542.42 70°17 27.627 N 148°21'36.66 W 12,732.66 92.31 277.97 8,791.36 5,953.83 -4,461.69 5,958,727.26 702,510.92 70°17'27.658 N 148°21'37.57 W 12,760.92 92.64 281.83 8,790.14 5,958.69 -4,489.50 5,958,731.35 702,482.99 70°17 27.706 N 148°21'38.38 W 12,797.93 91.32 287.20 8,788.86 5,967.95 -4,525.29 5,958,739.63 702,446.95 700 17 27.796 N 148°21'39.43 W 12,820.85 90.52 286.53 8,788.49 5,974.60 -4,547.22 5,958,745.67 702,424.85 70°17'27.862 N 148°21'40.06 W 12,850.76 89.63 282.90 8,788.45 5,982.20 -4,576.15 5,958,752.47 702,395.73 70°17'27.936 N 148°21'40.91 W 12,880.84 90.15 279.77 8,788.51 5,988.11 -4,605.64 5,958,757.56 702,366.09 70°17'27.994 N 148°21'41.77 W 12,911.02 89.51 277.53 8,788.60 5,992.65 -4,635.47 5,958,761.28 702,336.14 70°17'28.039 N 148°21'42.64 W 12,940.68 88.86 275.02 8,789.02 5,995.89 -4,664.95 5,958,763.71 702,306.59 70°17'28.070 N 148°21'43.50 W 12,970.72 90.12 273.88 8,789.29 5,998.22 -4,694.89 5,958,765.21 702,276.59 70°17'28.093 N 148°21'44.37 W 13,000.04 87.88 271.82 8,789.80 5,999.68 -4,724.17 5,958,765.86 702,247.29 70°17'28.107 N 148°21'45.22 W 13,030.70 87.51 269.05 8,791.04 5,999.91 -4,754.80 5,958,765.25 702,216.66 70°17'28.109 N 148°21'46.11 W 13,060.71 88.13 271.95 8,792.18 6,000.17 -4,784.79 5,958,764.69 702,186.69 70°17'28.112 N 148°21'46.99 W 13,091.04 89.51 275.99 8,792.80 6,002.27 -4,815.03 5,958,765.96 702,156.40 70°17'28.132 N 148°21'47.87 W 13,121.04 89.66 281.62 8,793.02 6,006.86 -4,844.66 5,958,769.73 702,126.65 70°17'28.177 N 148°21'48.73 W 13,151.18 89.08 287.06 8,793.35 6,014.32 -4,873.85 5,958,776.38 702,097.27 70°17'28.250 N 148°21'49.58 W 13,181.78 89.94 288.85 8,793.61 6,023.76 -4,902.96 5,958,785.01 702,067.91 70°17'28.343 N 148°21'50.43 W 13,210.00 91.11 293.36 8,793.35 6,033.91 -4,929.28 5,958,794.44 702,041.33 70°17'28.443 N 148°21'51.20 W 13,240.98 90.25 296.96 8,792.99 6,047.08 -4,957.31 5,958,806.83 702,012.94 70°17'28.572 N 148°21'52.02 W 13,270.60 93.38 299.11 8,792.05 6,060.99 -4,983.44 5,958,820.02 701,986.44 70°17'28.709 N 148°21'52.78 W 13,300.76 91.44 302.30 8,790.78 6,076.38 -5,009.34 5,958,834.68 701,960.13 70°17'28.860 N 148°21'53.53 W 13,330.75 92.98 306.19 8,789.62 6,093.24 -5,034.11 5,958,850.85 701,934.91 70°17'29.025 N 148°21'54.25 W 13,360.73 92.43 310.12 8,788.21 6,111.73 -5,057.65 5,958,868.69 701,910.87 70°17'29.207 N 148°21'54.94 W 13,390.76 92.52 314.49 8,786.91 6,131.92 -5,079.84 5,958,888.26 701,888.14 70°17'29.406 N 148°21'55.59 W 13,420.72 93.01 319.14 8,785.46 6,153.74 -5,100.31 5,958,909.50 701,867.07 70°17'29.620 N 148°21'56.19 W 13,452.89 92.49 322.38 8,783.92 6,178.62 -5,120.63 5,958,933.82 701,846.07 70°17'29.865 N 148°21'56.78 W 13,483.66 92.64 321.16 8,782.54 6,202.77 -5,139.65 5,958,957.43 701,826.39 70°17'30.102 N 148°21'57.33 W 13,510.74 90.92 317.44 8,781.70 6,223.28 -5,157.30 5,958,977.45 701,808.19 70°17'30.304 N 148°21'57.85 W 13,541.32 92.21 313.51 8,780.87 6,245.07 -5,178.73 5,958,998.64 701,786.17 70°17'30.518 N 148°21'58.47 W 13,570.83 91.97 311.27 8,779.79 6,264.95 -5,200.51 5,959,017.91 701,763.85 70°17'30.713 N 148°21'59.11 W 13,600.69 90.40 308.86 8,779.17 6,284.17 -5,223.36 5,959,036.49 701,740.49 70°17'30.902 N 148°21'59.77 W 13,631.10 91.51 306.40 8,778.67 6,302.73 -5,247.43 5,959,054.38 701,715.91 70°17'31.084 N 148°22'0.48 W 13,661.34 91.51 304.02 8,777.87 6,320.16 -5,272.13 5,959,071.12 701,690.74 70°17'31.256 N 148°22'1.20 W 13,690.86 91.81 301.38 8,777.01 6,336.10 -5,296.96 5,959,086.37 701,665.48 70°17'31.412 N 148°22'1.92 W 13,720.31 91.69 297.58 8,776.11 6,350.58 -5,322.58 5,959,100.14 701,639.48 700 17'31.554 N 148°22'2.67 W 13,750.77 94.09 295.69 8,774.58 6,364.22 -5,349.77 5,959,113.03 701,611.92 70°17'31.688 N 148°22'3.46 W 13,782.21 95.48 293.33 8,771.95 6,377.21 -5,378.27 5,959,125.23 701,583.07 70°17'31.816 N 148°22'4.29 W 13,810.30 95.94 290.39 8,769.16 6,387.62 -5,404.21 5,959,134.92 701,556.86 70°17'31.918 N 148°22'5.05 W 13,840.55 94.49 287.07 8,766.41 6,397.29 -5,432.74 5,959,143.80 701,528.08 70°17'32.013 N 148°22'5.88 W 13,870.06 95.10 283.45 8,763.94 6,405.03 -5,461.10 5,959,150.76 701,499.52 70°17'32.089 N 148°22'6.70 W 13,900.30 95.07 280.42 8,761.26 6,411.26 -5,490.57 5,959,156.17 701,469.89 70°17'32.150 N 148°22'7.56 W 13,930.29 95.56 277.70 8,758.48 6,415.96 -5,520.05 5,959,160.06 701,440.29 70°17'32.196 N 148°22'8.42 W 13,961.05 95.10 274.30 8,755.62 6,419.16 -5,550.51 5,959,162.42 701,409.76 70°17'32.227 N 148°22'9.31 W 13,991.02 95.29 271.64 8,752.91 6,420.71 -5,580.31 5,959,163.15 701,379.92 70°17'32.242 N 148°22'10.18 W 14,021.14 94.15 271.38 8,750.43 6,421.50 -5,610.32 5,959,163.11 701,349.91 70°17'32.250 N 148°22'11.05 W 14,050.38 92.03 274.20 8,748.85 6,422.92 -5,639.48 5,959,163.73 701,320.72 70°17'32.264 N 148°22'11.90 W 14,080.18 92.33 279.53 8,747.72 6,426.48 -5,669.03 5,959,166.47 701,291.08 70°17'32.298 N 148°22'12.76 W 14,113.12 91.48 282.94 8,746.63 6,432.89 -5,701.32 5,959,171.99 701,258.64 70°17'32.361 N 148°22'13.71 W 14,144.46 93.38 288.26 8,745.30 6,441.31 -5,731.46 5,959,179.58 701,228.27 70°17'32.444 N 148°22'14.58 W 14,170.70 92.64 293.75 8,743.92 6,450.70 -5,755.92 5,959,188.29 701,203.57 70°17 32.536 N 148°22'15.30 W 14,200.79 92.58 298.73 8,742.55 6,463.98 -5,782.87 5,959,200.83 701,176.26 70°17'32.666 N 148°22'16.08 W 14,230.72 93.04 303.60 8,741.08 6,479.45 -5,808.44 5,959,215.58 701,150.28 70°17'32.818 N 148°22'16.83 W 1/30/2015 9:25:51AM Page 6 COMPASS 5000.1 Build 61 0 bp Survey Report-Geographic Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 11-30-Slot 30 Project: Prudhoe Bay TVD Reference: Kelly Bushing I Rotary Table @ 62.40usft(NABORS 4E Site: PB DS 11 MD Reference: Kelly Bushing/Rotary Table @ 62.40usft(NABORS 4E Well: 11-30 North Reference: True Wellbore: 11-30A Survey Calculation Method: Minimum Curvature Design: 11-30A Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 14,268.03 93.38 311.15 8,738.99 6,502.04 -5,838.02 5,959,237.35 701,120.09 70°17'33.040 N 148°22'17.69 W 14,291.32 92.06 315.02 8,737.88 6,517.93 -5,855.01 5,959,252.77 701,102.67 70°17'33.196 N 148°22'18.19 W 14,320.54 89.51 319.16 8,737.48 6,539.32 -5,874.90 5,959,273.60 701,082.20 70°17 33.407 N 148°22'18.77 W 14,350.78 89.48 318.44 8,737.75 6,562.08 -5,894.81 5,959,295.80 701,061.67 70°17'33.630 N 148°22'19.35 W 14,380.94 88.99 313.19 8,738.15 6,583.69 -5,915.83 5,959,316.83 701,040.07 70°17'33.843 N 148°22'19.96 W 14,415.62 88.50 311.17 8,738.91 6,606.97 -5,941.52 5,959,339.39 701,013.75 70°17 34.072 N 148°22'20.71 W 14,442.36 88.83 308.14 8,739.53 6,624.03 -5,962.10 5,959,355.87 700,992.71 70°17'34.239 N 148°22'21.31 W 14,467.96 90.61 304.28 8,739.66 6,639.15 -5,982.75 5,959,370.42 700,971.65 70°17'34.388 N 148°22'21.91 W 14,500.64 88.19 300.65 8,740.00 6,656.69 -6,010.31 5,959,387.19 700,943.62 70°17'34.560 N 148°22'22.72 W 14,530.66 85.72 298.34 8,741.59 6,671.45 -6,036.40 5,959,401.22 700,917.13 70°17'34.705 N 148°22'23.48 W 14,570.18 86.77 292.86 8,744.18 6,688.48 -6,071.95 5,959,417.27 700,881.13 70°17'34.872 N 148°22'24.51 W 14,601.32 88.22 291.14 8,745.54 6,700.13 -6,100.79 5,959,428.12 700,851.98 70°17'34.986 N 148°22'25.35 W 14,649.78 88.22 287.74 8,747.05 6,716.25 -6,146.46 5,959,442.98 700,805.88 70°17'35.145 N 148°22'26.68 W 14,676.20 88.71 293.32 8,747.76 6,725.51 -6,171.18 5,959,451.55 700,780.92 70°17 35.236 N 148°22'27.41 W 14,710.30 88.43 296.50 8,748.61 6,739.86 -6,202.10 5,959,465.05 700,749.62 70°17'35.376 N 148°22'28.31 W 14,728.29 88.22 298.32 8,749.14 6,748.14 -6,218.06 5,959,472.88 700,733.44 70°17'35.458 N 148°22'28.77 W 14,763.00 - 88.22 298.32 8,750.21 . 6,764.60 -6,248.60 5,959,488.50 700,702.46 70°17'35.619 N 148°22'29.66 W Projection to TD 1/30/2015 9:25:51AM Page 7 COMPASS 5000.1 Build 61 • (V O L N 01 a) C j a) N cm al -Er co O_ O v C U N Icn T 2 ,.,C' = E E o HW p U ,6 I- W V co L Z C 'p Q N• ui Q W cc) U I o 2 d m 0 LU U U J o.N (O co 0 ) w (_n l_n N a) _ IZ Z a — O 0 m J m J O .N o O u) �, o 0 o •0 o 0 w n w E E• co 0 0 0 0 0 oa O N CO 2 N N 5 N C0 0 00 0 0 � 0 0 ail a) O X w w O O N O O w N -6 N a) N 3 E t 2 2 Lc) to °' Co w N 2 E a) M C C ^ E r C C 0 W o E o N C (:-.5 v m o o m E c m o 'p Q t 0 Z (o 60 _ in a W o � bo ) r1 LI- X °? m o (n < - o CC asa E d N O d N d`L" 7 m o ac) rn U) IX ^ E m m LL > a) E c J o ,, U N o °... J oa) CO o a d w E O (p -) M J O W O >- a) a) Q o ,ri ri ~ U F- M u7 c a) Z; O C E O) j E E C a 0 N m .2 a > a V) d m d < • 1 CO O Y a) O 0 a) I 7 M E o cc O 0 C p)7 -g. O Cl) W 2' co 2 Co C O. w m > p' rn C N m 3 N v v 8 w , E d E E Q CO 1 f p N m o 0 W w in 0a M 0 �_ C H c N p a co OS �, 2 w a .- o a _3 0 Cr) W o aco `) a, 1p LL ' U o w O c a 0 E o 2Q d ca C E .Q Q w '^ c o a m a O 3 -p Y o U Z m m r co O O >. co U) co ^ O) ' O N Z w Cl) co J [1 0 _ Y a 0. o ai _ O N U CoO O O• O Q 0 a) a) "' a) O) 0 1r) CO O)co W E LL co m E E c d 0 a) N a) r Z > 0 V) O N O) U (n U) 2' Q O C05 O z a) o E fi N 2 7 E c F� FZ � L vN >p o W y > .. Z 2o c w < VL Lu oog ° M ¢ O m U 5 F 7 a0 OJ OJ 0 m u W m 0 Q 3 E 1,;'- Z U < j W a) a) < 0 0 (i Q' N LL W W a Z F- coo CO W J Z U ^ O W COO Z W o = Yw o m C.)WO a W w a co P cu o W Q J 0 2 '' W Q o 0 0 ''� 2 O - v 0 0 co O ct Z W W R. LO 6 o co 2 U) dCF3 r F U O. ,- N E o U) Q Z' c m 2 �c a o >, Z O f0 W (n W co U E 1;1- N O U o yN E m T N a1 Ill F- Z o ) ix a o COu) E c) N 'N> j 0 OZ m E - ac) 0 C) ai co ''I C a T :..°, NO 0 N > I= l6 E d Q) j CI • E. N a)• 1A U oa1E I) C a) a7 d p w F- C- Co CD N. t` a > o E E a) is 'o Z a Y a`) a co v CD o co r` r a 'O n. W O 0 o O a) o d 7 n N U 7 o o co F- U U a m m U. in a (n 0 2 0 0 0 0 0 0 • , N U_ O 7 O 5 ,a al c LL Q L +� 6 Q m al a y O _� O. LO U To J z IE, H 7 I a, 5...4._ M CO ;---,:l p al U a > j > a) U t o E U) co j �N-' Z Z a U 0 a) o mo Z-2 Ut a U a I- ti 0 vi- o Cu H l- a) CO w ai n csjj o E o > ,O p .0 Cu Cu F o c a z o N 11 g 0 co ., Y a H c co O V ce N N r 0 ZE c O 'p o «. J a 7 w V. et a) v) < co O Cu a d = E aci °' Z N i a) m M a m-- E Z Z N --,i-) yd a d E E v a avZ E N o To > 7 13 O a)> LL = a o N > O a N N Cu {Op m Y7 N N m J a .. _OU_ '�"+ Cu d Cu Z' O a) c .. 0 I 7 0. N c• c 2 O. -12rn N a) U) E .. C p � W (D w a a N a Cu b. N u u p U Cu c 12 L E N 41 N O, O C_ C 7 c_ c) = m CO a m c U ~ L. ao z i= U o E g 6 a) O E N d o o a > E X H �? ik c u d E E CC CO a g o ('n d o Q 0 o, CO E 3 O a c E 3 L Cu 0 0 0 D o 0 VU N p > U I H -, = 2 I O 7 H a Z ,, E m o O .. Cu o 0.1 z Y E m N y Z� O Z E -p 2 n 7 0, F a N N 7 a E) W a N ,. m E "p I- d Z aZ C Cu a o m m Q U a Z'2 u) m m ..22 v c u) J N Oo O a) p v o °?E I— hli u w a o, a« .E '... F- N o0 < 6 K d Z u, 2 w a 0 a) N c N E 7 aE � 4 m a p 7 COas ih z > a1-2 0 V > Z a Z Z L U V W o a F c a) N r C m d - 0 m H H La a E o a r I Q a) w 5 Z O 0) w d ca c 0 ccv m 0 U o Cl) 0 O a22(13 , N a1 O V >- 7 CuN jZcc Cu- O O N a 0. N W 5 N c 7 >. J C Cl NO Cl LL N N a) O a O F U O m w C 3 c > > a) E N _ o ,O N- cuC 7 a Q 7 a U) O c o � > o m o Cl ai Cu LY d v v a a` a` o a w c) D M y E a) m c o w o a) N H F (.. 0 7 CO 0 m I— 1 j6, 1 Pim 7,4(-74u Regg, James B (DOA) From: Regg, James B (DOA) - ( I?,61 1 s Sent: Wednesday, January 28, 2015 4:12 PM �'� To: 'Madsen, Alan D' Subject: RE: BOP usage for wellbore breathing PTD# referenced on form should be 214-174. I changed our copy for files; it is not necessary to resubmit. Jim Regg Supervisor, Inspections AOGCC 333 W.7th Ave,Suite 100 Anchorage,AK 99501 907-793-1236 CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information. The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Jim Regg at 907- 793-1236 or jim.reng@alaska.gov. From: Madsen, Alan D [mailto:Alan.Madsen@BP.com] Sent: Tuesday, January 27, 2015 4:20 PM To: Kilfoyle, Jeffery A; Daniel, Ryan; McMullen, John C; Allen, Kenneth W; Endacott, Mary S; Bjork, David; Kolstad, Scott R; Willingham, James M; Schneider, Kenneth J; Burnett, Richard D; Sarber, Greg J; Green, Darrell; Newlon, David B; Cismoski, Doug A; Isaacson, William S; Mattson, Greg; DOA AOGCC Prudhoe Bay Subject: BOP usage for wellbore breathing Guys, Here is the BOP usage form for the shut in on Nordic 1 last evening. It was later confirmed to be wellbore breathing. Alan Madsen (Dave Newlon alt.) AK. D&C RWO Operations Superintendent Cell 907-306-4997 Slope office 659-5329 Harmony 2157 (As a phone--Dial, 1-907-659-3106 then 1 then 758-2157) Those who turn their swords into plows will be ruled by those that don't. 1 • AOGCC BOPE USAGE REPORT FORM (Well Control event only) Field Superintendent Name: Wellsite Leader Name: Robert O'Neal Dave Newlon Contact Number: 659-4541 Contact Number: 659-4433/4564 BP Traction Number: IR-4918231 Rig Name &Well Pad or Drill Site &Well Name: DS 11-30A Rig Nordic 1 Permit To Drill (PTD) Number: 217.4- Zi —174- Date (74Date and Time of Incident: 01/26/2015 19:00 Original Scope of Work: Prepared to POH for BHA Change. Flowcheck was performed and .1 BPM return would not stop,total of 4.5 bbls were returned over the monitoring period.The well was shut in using the HCR and Pressuring up the Injector packoffs per the standing orders. Wellhead pressure of 43 psi was observed after 10 minutes and increased to 300 psi after 30 minutes. Operational Description Leading up to Well Control Event: Drilling ahead, POOH for BHA Change BOPE Used and Reason: Yes, HCR shut and Injector packoffs pressured up. Current BOPE test time/date Last test 01/17/2015 Due 01/31/2015 Is a BOPE re-test required after use: Yes/No and reason Yes, HCR and Packoffs will be retested when we Finish POOH. ✓ BOPE Retest time/date and result (WSL to complete as applicable) 01/27/2015 18:00 hrs ✓ Plan Forward: MU Drilling BHA with new agitator and motor. RIH to drill ahead to proposed TD of 14,875. Additional Comments: Two full bottoms up circulations with 9.5 PPG Power pro Mud were circulated from 11,500'. Whe well was flowcheckec minutes before operations to POH. ACTIONS REQUIRED: 1) Well Site Leader: Timely email notification of BOPE re-test time estimate to AOGCC North Slope Inspectors is required following any WC incident to allow the State to witness re-test as required. (This is a judgment call given WC is an unplanned event during rig operations and factors such as wellbore condition and trip timing will influence timing of any retest) 2) Superintendents: Email the completed BOPE Usage Report form to AOGCC North Slope Inspectors within 24 hours of a WC incident: doa.aogcc.prudhoe.bav@alaska.gov 3) Well Site Leader: Complete AOGCC BOPE Test report form 10-424 and send to three AOGCC addresses (noted in form) within 5 days following the test/retest. This is applicable to Well Control events Only. f -7CEIVED 2 1 41 74 FEB 1 8 2015 2 5 4 2 5 AOGCC ,�`■ DATA LOGGED BAKER PRINT DISTRIBUTION LIST m. AA ENo R HUGHES COMPANY BP Exploration INTERMEDIATE FINAL Yes (mandatory) WELL NAME 11-30A RUN NUMBER (mandatory) FIELD Prudhoe Bay BH SALESMAN Jesse Salyer (mandatory) (mandatory) COUNTY North Slope Borough BH DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: January 27,2015 TODAYS DATE: 2/12/2015 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: BP Exploration (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? No COMPANY ta FIELD FINAL (digital/ ADDRESS(FEDEX WILL NOT DELI VER TO P.O.BOX) LOGS LOGS image) FILM PERSON ATTENTION #OF PRINTS #Ur FitlN I S #OF COPIES #OF COPIES 1 ConocoPhillips Alaska,Inc. I I 1 NSK Wells Aide,NSK 69 ATTN:Ricky Elgarico 700 G Street, Anchorage,AK 99501 2 AOGCC I 1 1 I I ChristinrMehnkea 333 West 7th Ave,Suite 100 Anchorage,Alaska 99501 3 BP I I I I Petrotechnical Data Center,MB33 David Douglas 900 East Benson Blvd Anchorage,Alaska 99508 4 Chevron/KRU REP I 1 I 1 I Glenn Fredrick 3800 Center Point Drive,Suite 100 Anchorage,Alaska 99503 5 Brandon Tucker,NRT I I I I I I State of Alaska;DNR,Div.of Oil and Gas 550 W.7th Ave,Suite 800 Anchorage,Alaska 99501-3510 TOTALS FOR THIS PAGE: 0 2 4 0 0 0 TOTALS FOR ALL PAGES: 0 2 4 0 0 0 RECEIVEDt2.3 ,A` PRINT DISTRIBUTION LIST FEB 1 8 2015 BAKER a eD l000 HUGHES AOGCC aaTZ n,�u1 COMPANY BP Exploration Alaska,Inc. INTERMEDIATE No FINAL Yes AA.K BEND q (mandatory) WELL NAME 11-30A RUN NUMBER 1 (mandatory) FIELD Prudhoe Bay Unit BH SALESMAN Henry Giordanelli (mandatory) (mandatory) COUNTY North Slope BH DISTRICT Prudhoe Bay,AK (mandatory) (mandatory) STATE Alaska PAGE 1 OF 1 (mandatory) LOG DATE: February 2,2015 TODAYS DATE: 2/15/2015 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: Henry Giordanelli (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANY A B C D ADDRESS(FEDEXWILL NOT DELIVER TO P.O.BOX) L.I.S. FILM PERSON ATTENTION #OF PRINTS#OF PHIN t S #OF COPIES#OF COPIES#OF COPIES#OF COPIES 1 ConocoPhillips Alaska Inc. 2 1 1 1 Attn:Ricky Elgaricio A= 11-30A_MRPM_RAW 02FEB2015_BHI.meta ATO3-344 B= "(Folder 1 on cd/dvd) 11-30A MRPM_RAW_02FEB2015 BHI.meta 700 G Street C= **(Folder 2 on cd/dvd) 11-30A MRPM_RAW 02FEB2015 BHI.PDF Anchorage,AK 99510 D= ***(Folder 3 on cd/dvd) 11-30A_MRPM_RAW_PASSO2UP_02FEB2015_ 11-30A MRPM RAW PASSO1DOWN_02FEB2015_E ****(Folder 4 on cd/dvd 11-30A_MRPM_RAW_PASSO2UP_02FEB2015 11-30A_MRPM_RAW_PASSO1 DOW N_02FEK * Folder 1 on cd/dvd needs to be named"META" ** Folder 2 on cd/dvd needs to be named"PDF" *** Folder 3 on cd/dvd needs to be named"DLIS" **** Folder 4 on cd/dvd needs to be named"LAS" 2 ExxonMobil,Alaska 1 1 1 I 1 Attn:Lynda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr.Suite 600 Anchorage,AK 99503 3 State of Alaska-AOGCC 1 1 I 1 1 I I Attn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 4 DNR-Division of Oil&Gas 0 I 0 1 1 Attn:Sean Clifton 550 West 7th Avenue,Suite 802 Anchorage,Alaska 99501 TOTALS FOR THIS PAGE: 2 2 2 2 0 0 TOTALS FOR ALL PAGES: 2 2 2 2 0 0 Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWelllntegrityCoordinator@bp.com> Sent: Sunday, February 08, 2015 1:53 PM To: AK, OPS FS2 Field OTL; AK, OPS FS2 OSM; AK, OPS FS2 DS Ops Lead; AK, OPS FS2 Facility OTL; AK, OPS PCC EOC TL; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; Cismoski, Doug A; AK, RES GPB East Wells Opt Engr; AK, OPS EOC Specialists; Daniel, Ryan; AK, RES GPB West Wells Opt Engr; G GPB FS2 Drillsites; Vohra, Prachi; Wallace, Chris D (DOA) Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Well Integrity Coordinator; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Regg, James B (DOA) Subject: OPERABLE: Producer 11-30A (PTD #2141740) Rig Workover Complete-MIT-IA Passed Attachments: image001.png; image002jpg All, Producer 11-30A (PTD#2141740) underwent a rig workover and sidetrack completed on 02/04/2015. The well passed a MIT-IA on 01/12/2015. A subsequent MIT-IA passed on 01-14-15 following gas lift valve work.The passing test confirms two competent barriers in the wellbore. The well is reclassified as Operable. • Well status is Operable • Annuli are fluid packed, AFE sign and tags have been verified • A SSSV is not required Please use caution while placing the well on production due to fluid packed annuli and the possibility for annular fluid expansion. Thank you, Kevin Parks (Alternate: Laurie Climer) BP Alaska-Well Integrity Coordinator GWGlobal Wells Organization Office: 907.659.5102 WIC Email:AKDCWellIntegrityCoordinator@bp.com From: AK, D&C Well Integrity Coordinator Sent: Wednesday, October 08, 2014 4:19 PM To: AK, OPS FS2 OSM; AK _,FS2 DS Ops Lead; AK, OPS FS2 Facility OTL; AK, OPS PCC EOC TL; AK, D&C Wireline Operations Team Lead; AK, D&C We►I Services Operations Team Lead; Cismoski, Doug A; AK, RES GPB East Wells Opt Engr; AK, OPS EOC Specialists; Daniel, Ryan; AK, S GPB West Wells Opt Engr; G GPB FS2 Drillsites; Vohra, Prachi; 'chris.wallace@alaska.gov' Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Projects tegrity Engineer; AK, OPS FF Well Ops Comp Rep; 'Regg, James B (DOA) (jim.regg@alaska.gov)'; AK, D&C Well Integrity Coordrlator Subject: RE: NOT OPERABLE: Producer 11-30 (PTD #1940770) CMIT-TxIA Passed 1 6,1��\\I%%i k� 1 .� HE STATE l_:'_aS, E. ,� 1 a.11C:i ?,,E .5 % ,, ,_f /, T /, ,r -I 7-- 4 - - I -„,- .__ -<'_ ; { ill \ ,.,�moi 2- e ,\— _ \__,_ , "^_:: �:7�r ( ( �'1 12N012 �,} .;: I),',12\ t-i_I_ Anchorooe. Aiosko 99501-357:' \\\ y �1 ',An n07 7-9 1te,i �,u N John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 11-30A BP Exploration(Alaska), Inc. Permit No: 214-174 Surface Location: 1185' FSL, 383' FEL, SEC. 28, T11N, R15E, UM Bottomhole Location: 2742' FSL, 1436' FEL, SEC. 20, T11N, R15E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, o.ae/L__z.��j Daniel T. Seamount, Jr. ,J/'� Commissioner DATED this 't day of November, 2014. t STATE OF ALASKA RECEIVED ALA` )IL AND GAS CONSERVATION COMA )N OCT 2 4 2014 PERMIT TO DRILL 20 AAC 25.005 AOGCC 1 a.Type of work: 1 b.Proposed Well Class: ®Development Oil 0 Service-Winj • IN Single Zone 1 c.Specify if well is proposed for: ❑Drill 0 Lateral 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 Coalbed Gas 0 Gas Hydrates • 0 Redrill 0 Reentry 0 Exploratory 0 Service-WAG 0 Service-Disp 0 Geothermal 0 Shale Gas 2.Operator Name. 5.Bond -®Blanket 0 Single Well 11.Well Name and Number: BP Exploration (Alaska) Inc. Bond No 6194193 - PBU 11-30A • 3. Address 6.Proposed Depth: 12.Field/Pool(s) P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 14875' ' TVD 8680'ss ' Prudhoe Bay/Prudhoe Bay • 4a.Location of Well(Governmental Section): 7.Property Designation(Lease Number): Surface: ADL 028325, 028322&028321 1185'FSL, 383' FEL, Sec.28,T11N, R15E, UM Top of Productive Horizon: 8. Land Use Permit: 13.Approximate Spud Date: 1899'FSL, 3816' FEL, Sec.21,T11N, R15E, UM February 15,2015 Total Depth 9.Acres in Property: 14.Distance to Nearest Property: 2742'FSL, 1436' FEL, Sec.20,T11N, R15E, UM 2560&2480 32300' 4b. Location of Well(State Base Plane Coordinates-NAD 27). 10.KB Elevation above MSL: 62.4' • feet 15.Distance to Nearest Well Open Surface: x 707135 • y-5952899 • Zone- ASP4 GL Elevation above MSL: 27.2' • feet to Same Pool: 350' 16.Deviated Wells: Kickoff Depth: 11500' • feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle. 93 degrees Downhole. 3368 • Surface: 2488 • / 18 Casing Program Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 4-1/4" 3-1/2"x 2-7/8" 9.2#/6.4# 13Cr80 STL 3637' 11238' 8169'ss 14875' 8680'ss 212 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD(ft). Plugs(measured) Effective Depth MD(ft): Effective Depth TVD(ft). Junk(measured) 13719' 8759' None 13719' 8759' 12657',12766',13714' Casing Length Size Cement Volume MD TVD Conductor/Structural 76' 20" 260 sx Arcticset(Approx.) 35'- 111' 35'- 111' Surface 3947' _ 13-3/8" 1561 sx CS III,375 sx Class'G' 35'-3982' 35'-3723' Intermediate 11361' 9-5/8" 775 sx Class'G' 32'- 11393' 32'-8317' Production Liner 1593' 7" ,285 sx Class'G' 11232'- 12825' _ 8228'-8785' Liner 1056' 4-1/2" Uncemented Slotted Liner 12663'- 13719' 8778'-8759' Perforation Depth MD(ft): 12720'-12792', Slotted Liner 12792'-13696' Perforation Depth TVD(ft): 8782'-8784',Slotted Liner 8781'-8760' 20.Attachments: 0 Property Plat ®BOP Sketch ®Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis 0 Diverter Sketch 0 Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date 22 I hereby certify that the foregoing is true and correct: Contact Zach Browning,564-4220 Printed Name J hn McMullen Title Engineering Team Leader Email Zachary.Browning@bp.com bkw Signature % ,cr..4L t) k �; 0;,0„Me.v‘Phone 564-4711 Date \Cs-Zi —ZC,I'-( Commission Use Only Permit To Drill r / API Number. Permit A l 4 va tar: See cover letter for Number: ,L/`1 77� 50-029-22484-01-00 I I !-f other requirements: Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas IET/ —/ contained shales: Other: r�0 p t5 - 1„ c3,5-00S ; Samples Req'd ❑Xes o Mud Log Req'd: Oyes No //-l'7v2 via 0-- 1-2•-•5 t i-o 2 50 0 p S i HZS Measures. 12'Yes Oplo Directional Survey Req'd: aYes ❑ o Spacing exception req'd: 0 YesZUlf No inclination-only svy Req'd: 0 Yes EiNo P z------____ � APPROVED BY / / f c1 Q— APPROVED = r COMMISSIONER THE COMMISSION Date f /- I ICI-- Form 10-401 Revised 10/2012 g OsRitti\trArtnths from the date of approval(20 AAC 2 (4 m andn hments In Duplicate n- rzz/ To: Alaska Oil & Gas Conservation Commission From: Zach Browning 0 bp CTD Engineer Date: October 24, 2014 Re: 11-30A Permit to Drill Request i Approval is requested for a permit to drill a CTD sidetrack from well 11-30 with the SLB/Nordic 1 Coiled Tubing Drilling rig, targeting Zone 1. Rig Work (scheduled to begin -February 15th, 2015) 1. MIRU and test BOPE 250 psi low and 3,500 psi high. (2,488 psi MASP). 2. Mill 3.80" window at 11,500' MD and 10' of rathole. (TT WS to be set pre-rig) 3. Drill build/lateral section: 4.25" OH, -3375' (12° deg/100 planned) with GR/RES. 4. Run 3-1/2" x 2-7/8" 13Cr liner leaving TOL at -11,238' MD. Pump primary cement leaving TOC at TOL, -11,238' MD, 43.7 bbls of 15.8 ppg 5. liner cmt planned. 6. Perform liner cleanout with mill, motor and RPM/GR/CCL log. 7. Perform liner lap test to 2,400 psi 8. Perforate liner based on log interpretation 9. Freeze protect well to 2500' TVD 10. Set TWC, RDMO Post-Rig Work: 1. Re-install wellhouse, flowline and pull TWC. 2. Set generic GLV's, SBHPS, ASRC flow back, SIT. Mud Program: • Milling/drilling: 9.5 ppg PowerVis for milling window and drilling (979 psi over-balance). Disposal: • All Class I & II non-hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >11 must go to GNI. Hole Size: • 4.25" from 11,500' MD to 14,875' MD. Liner Program: • 3-1/2", 9.2 lb/ft, 13Cr, STL Solid liner 11,238' MD - 11,495' MD. • 2-7/8", 6.4 lb/ft, 13Cr, STL Solid liner 11,495' MD - 14,875' MD. • A minimum of 43.7 bbls of 15.3 ppg cement will be used for liner cementing (TOC 11,238 MD). • The primary barrier for this operation: a minimum EMW of 8.4 ppg. - • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional • See attached directional plan WP_04. Maximum planned hole angle is 93°, inclination at kick off point is 57°. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property— 32,300'. • Distance to nearest well within pool 350' (18-25APB1). Logging • MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section. • Cased hole GR/CCL/MCNL logs will be run. Perforating: • SWS 2" PJ 6 spf perf guns, 1-1/4" CSH work string & 2-3/8" PH6. • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti-Collision Failures • 11-30 Parent well fails at KOP. • 18-25A and 18-25APB1 fail major risk; pass minor risk — no errors. o 18-25A is abandoned with a plug set downhole in the tubing. Hazards ; • Drill Site 11 is an H2S pad. • Most recent H2S level on 11-30 is 8 ppm recorded on 10/10/2009. • The lost circulation risk for 11-30A is considered to be medium. Reservoir Pressure • The reservoir pressure on 11-30A is expected to be 3,368 psi at 8,800' TVDSS. (7.36 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,488 psi. • An EMW of 9.5 ppg for this well will provide 979 psi over-balance to the reservoir. Zach Browning CC: Well File CTD Engineer Joe Lastufka 907-564-5220 TREE= FMCLHEASAL .NOTES: WELL ANGLE>70'@ 12134'. ACTUATOR= BK R C 11 —3 0 ""4-1/2"CHROME TBG*** OKB.aEV= 62.4' I BF.a.EV= 2132' -14-1/2"HES X NP,D=3.813" KOP= 1253' Max Angie= 93°©13333' 3246' 1OVERAL PARTIAL COLLAPSED PPS D=3.46" Datum MD= 12975' Datum TVD= 8800'SS GAS LIFT MANDRELS ST MJ TVD DEV(CALPSR TYPE9118113)VLV LATCH PORE DATE la 5 3076 2983► 26 MMG DOME RK 16 04/24/11 13-3/8"CSG,68#,NT-80,D=12.415" --1 3982' 4 4070 3789 ' 41 MMG SO RK 20 04/24/11 3 7202 5818 ' 50 KBG-2 DMY BK 0 07/07/09 2 9494 7293 ' 55 KBG-2 DMY BK 0 06/25/03 Minimum ID = 3.25" @ 12180' 1 11113 8162 ' 56 KBG-2 DMY BK 0 06/25/03 LNR RESTRICTION ' 11182' H4-1/2"HES X NP,D=3.813" 11203' —1 9-5/8'X 4-1/2"BKR S-3 PKR D=3.875" 11228' H4-1/2"HES X NTP?D=3.813" TOP OF 7"LNR —1 11232' �: 11232' —19-5/8"X 7"TEBK,TIW LTP &LNR HGR,D= 4-1/2"TBG,12.6#,13CR-80 VAM ACE, --{ 11249' I .0152 bpi,ID=3.958" ' 1 11253' —7"X 4-1/2"UNIQUE OVERSHOT 4-1/2"TBG STUB(06/18/03) — 11247' g-} 11276' H 7"X 4-1/2"BKR SABL-3 PKR 11310' H4-1/2"OTiS X NP,ID=3.813" 4-1/2"TBG,12.6#,L-80 TOS, — 11322' \ 11322' —14-1/2"WLEG,D=3.958" .0152 bpf,ID=3.958" 11336' — amp TT LOGGED 12/16/94 9-5/8"CSG,47#,NTT--80S NSCC,D=8.681" —1 11393' 7"LNR,29#,NT-80 NSCC,.0371 bpf,D=6.181' 11415' X 11665'& 12180' —I LNR HOLES(PROF 04/14/09) 0 '� 12180'& RESTRICTIONS, 12504'-12540' MLLED TO 325"(02107/14) 12657' -I FISH-BOT DISCO,CRC SUB,MOTOR, ll 3.25"MLL(02/09/14) 12663' 1 r X 4-112"TIW SS HIGH TOP OF 4-1l2"LNR H 12663' ANGLE HGR PKR,ID=4.00" 7'LNR,26#,NT-80 NSCC,.0383 bpf,0=6.276' —1 12825' ••• r 12751' -H4-1/2"PORTED IOM'(41.49') LFISH SH-HES OBSIDIAN CBP, PERFORATION SINMMRY � 1276 MLLED&PUSHED DH(02/09/14) REF LOG:MWD POROSITY ON 06/04/94 I ANGLE AT TOP PERF:88°@ 12720' I I I Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sgz SHOT SOZ I 3-3/8" 6 12400- 12412 S 03/31/98 06/08/10 13714' —FISH-SAFETY CLAMP DE 3-3/8" 6 12432-12458 S 03/31/98 06/08/10 FROM DOG COLLAR 3-3/8" 4 12500-12550 S 05/10/96 06/08/10 3-3/8" 4 12602- 12638 S 05/10/96 06/08/10 111101 - 3-3/8" 5 12720-12792 0 06/13/94 4-1/2" SLOT 12792-13696 SLID 06/14/94 4-1/2'LNR,12.6#,L-80/13CR NSCT, —1 13719' .0152 bpf,ID=3.958" DATE REV BY COMMENTS DATE _REV BY COM ENTS PRUCHOE BAY UNIT 06/16/94 NQ8E IMTIAL COMPLETION 01/08/14 PJC LNR/TBG CORRECTIONS WELL: 11-30 06/26/03 N4ES RWO 02/17/14 TO/JMD LNR/TBG RESTRICT,FTSH,MILLED BI PERMIT No:'1940770 11/14/10 MIC/AGR GLV C/O(11/02/2010) 02/20/14 PJC RESTRICTION CORRECTIONS AR No: 50-029-22484-00 04/22/11 GJF/PJC GLV C/O(04!12/11) SEC 28,T11 N,R15E, 1185'FSL&383'FEL 04/27/11 MCMPJC GLV C/O(04/24/11) 01/07/14 TTR/PJC LMR HOLES/RESTRICTION BP Exploration(Alaska) TREE " IWILFEAD= _ CNV RWO + rD 11 -30A S �J ,NOEES: WELL ANGLE>70"@_. . . . MAAACTUATOR= PROPOSAL I I OIB:E EV= 62.4' BF.ELEV= —2200 —14-1/2"HES X NP,D=3.613" KOP= 1253' Max Angle= --°@_- --"CONDUCTOR, GAS UFT MANDRELS — — Datum MD= #: , ST MD TVD DEV TYPE VLV LATCH FORT GATE Datum ND= 8800'SS D= 5 „•1^,,il 4 13-3/8"CSG,68#,NT-80 BTC,D=12.415" H 3982' 3 I 2 1 Minimum ID = 2.377" @ -14840' 3-1/2" X 2-7/8"XO , —10826 H''- i ' ' HESX NIP,D=3.813" ► —10861 —19-5/8"X 4-1/2"HES TNT PKR,13=3.8_" 4-1/2"TBG,12.6#,13CR-85 VAM TOP, —i —10881 , il —11142 --I9-5/8"X 4-1/2"NS OVERSHOT .0152 bpf,D=3.958" 4-1/2"TBG STIR(XX/XX/14 —I ( 11182' = ' 11203' H9-5/8"X 4-1/2"BKR S-3 PKR,13=3.875" IM 11228' H4-1/2"HES X NP,D=3.813" TOP OF 7"LM H 11232' L :— 11232' —19-5/8"X 7"TEBK,ITN LW &LWHGR D=? _� TOP OF 3-1/2"X 3-1/4"X 2-7/8"LNR —I • ,i I ;- 1i 1 1 ':; SI W .0W `u� a= w Da F, Z CI. CO t a 0 O. a) a W ia a) c) c •.... ..0 a) c = E o CI a i— r ata N co r, o M O Q N ,- Q -0 O , V 2 co -0 Z & ± a CO N •°41. --. o111 N 1 c l 03 03 • W OO to 'S� Z w1� � Q Q Z ! CO� 0ZZ 01o o. = W c7O co N O m E"' 7 7 LC) N N h O Z '�' O a- c0 0 N in a co ...• m m _ O .c a 0 c o 0 I-I 0 a ti Z Zri M O O 7 Y C V O CC a to. 0 3 H 0 1 0) j Q > ,u ra hi 0 mm 7a cn> m y, v _ >,>, m Eg c rn rn u „ 3 v a� 7 c as c c c o c YY !- W a).7) in .= co 7 0 (5 C O N > J J O hi m7 0 C C 3•01 N C rCD O 'O C u al 7 3 0 r. aJ C 0 A 0 o al d cg >„ A E 7 7 s V C ,- ••••• 6 d' L N G r n O ,_ U e V D 0 .5a ^ CO CO fail .m, r.. J I- a Z (0 O N LO CO 0 LO 7 co 7 CO 0 (.1 t W O 0 O car- rn M co 0. tri 1 co Qt Ill N r Ce m r, C 0) O Q d c _a r m 7 0 0 H 0 o m w o w uJ p a. 7 m I (3 t- + N CO m c a 'wo I m m .c - c of o 1 c a_ o co ° r c .0 zww r 0 , 03V o co zw31 u eQ O' 0y o a Z ` o z 5 a r a ; v m w R N O o ! 0 0 0 •3 a 00 R rE a o� E p 0 U) 0 y a o a.m c m Z '•, = = = U. . c`7 0 LL 0 e- I 7 7 7 « 1-Z N CO O O O ( 0 CI) CO0 NO ~ O '.. C O O O 0 0 U .�- O• fn E N a Q L cca Z O O O p a7 2 O a) Nr ` d C m m C a CU N N a co y .- m a li m m � 3 0 co Y 2 9 2 < O co < < 0 m Z u7 r 132 0 � 7Z Q .' + + z, O 2 CO c l c Zaa — t c o a) c a) ° o a E o ° c ari uui co E 6 = 7 m ;; A a .. O C 1.1 CO la O O O ° O O d C Z A O a �' a of m co 0 N a _ a a c rn u c� O O` x d al d O� as d of •._m. O d m C ai CO� d 7 d m 05N c� arn330 a 20 2 N u)u. a 3 3 a 3 2 0 ¢ > > o _ _ _ _- O _-.0 O O .. (O O N O N CO coim O O co O (r O M O V O (O n 'C U l®�= m m () !- 0 o O aO 00 W ui U[) si C) M �W(� Q Q v n s- O o CO co u? u� COo �� ZZ U^ lo- 104z W == 40 co o DI F > > o Z v v 1 ill0) N N d _ (n O O 0 N O O) co O 0 O r C) n C) V 0 ©@ Z 0 N CO N CO CO N- CO N N I- O N a 03 CD Q N M6 M UO O CO 00 N- 7,4: N N- Z N co U7 CO 0 CD M 0 O N- 0_ N ‘'-M (D co _O O Q n N- co co 0) 0 0 00 0co co = cr co co (0 cr r- N- N- r; r- I n N � Z'Z H O CO CO N 0- >v CO O O = Y O ( WN_q O ZQ ! N N- 0 0 O 0 0 0 0 O 0 0 0 0 C D N CO O 0 0 O O O O 0 0 0 0 0 I O L L VY A ,- , oiNoi ,- Noioioi oi • ' ' o- • mmCX co > > o E g C 00 Y Y F W o N `M N- V ' O _. 0 co CO CO 0) ,II COO CO M N- CO 0) O L O 0)) co V O N M O O 0) N- O) N 0 _ to' co O V C`7 coC7 N N O O 0) (A (P '� O .�'.Sc M M M C') C7 M M (h M M N N N m =' O O C' M 0 O 0 3 0 0 O CD O C) C) O C ISI 1 v N N- N- N- N- N. N- r• N. n N- N- n N m 0 a W C m v co C V . C a) P. C m C a. UF., CD N d' O N- CO O N CO CD O (0 CO 0 CO (A N co ,- O CO CD CO O CO CO O) O 2 y CD(.) co No: <t O N U) O) v M O O (0 CD CO ✓ m w of O M V CT co O O O V N (D N � W a) m� o ..-EF C O O CO o 0) CD rn CZ Cn CJ) 0) CO CO co ✓ D C - c -a t F ao ao co m op ao co ao oo ao ao oc ao co Y W O O O co U) O O U) O O U) O O O J > 224043 CO 4. CO I �v0 rn m rn rn rn C) m C) C) rn CD CD rn C c c 2 ui u) 1.6. u5 ui ui ui O ui ui tri «i 1. 1.6 0 CO N co 1 O' .v O N N N CO St r N- O W CO N N O 0 c 0 O O (n 0 O ti O CO CO (D co Ct N .0 VM M05 V M O O CA N05 U) O m O n co N CO O N CD O C- O) N. VCO /� O) D SS v vv (n O m O CO CD o o W 7 1 i C? M_ M_ C? C? C i C'-.5. 7 C7 M C;'i c' f? f ,f ! I U (O N sr r CO U1 N. CV O CA N N V CD a 0 O oo v (o a) oo v O -t co L c.) m m z CD V — V W O N N O O M N O O co O O _M O co_ O O CO N o O O CU X CO Z OI . O y)N (O (0 (O (O (0 (0 (0 (0 (O (O CO (O (O (0 a O 303 z ` H 2 K m1 1 n co co Cl) CD CA CO St O O N 0) CO CO U) V CO (O O O N. O O O N N N N M N O CO N O) O N- r r r N ! co Nr-- V o N. CA CO CO N o Cl) NM CO CO v O O O CO CD CD N- N- N Ca H O O 00 O O 00 CO O CO CO (O CU 0 CO 0 O -2- c? O O0) CO r O Nr v v CO N CO O Cs- A, ` a C) Q) ''O O co C) O n O CO C0 N N CV r m CCOO CCD COO LO Q 0,-) CO C') M M N N N N N N N N CV N a• co sr sr 1 d a m (n c c Q.°°-- m 4 N E c. m d o_ CD CV M m 00 1CD CV O_ O I co O O m O N N I,- CO C) 0) N CD Q (.0 .- .- R 0 o CO CD CO OD O CD N CO M CO D) co N r (O r (O W r) h (h co Co ti (A +� C. 0 C) (C') O O v v v U) O O o CO N- CO CO U >, C G M O O 1 (0 co CD Vim .- d O y r CO C`. • ao) Q Q ~ = rO .0 0 2 co M 0 0 E z a d r c 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o F o 0 O O O T <0 O O o O O 0 0 O O O o C') O a. O csi u-i ai O O O O o O sr co p 0 o N o O O O St Q o E c - n 7 O p,O O N- CO CD CA O O NN F.; fM O In T iloi Om - - = — a- , Q— � � N oco N 1- ...,, ....0 La .. a LL g .- I=.- Y� co sr cne- COV ., No co c *" Eo« ddw Z C N `' va` rn � 3o Cl) a o ® III O O O O O O O 0 0 0 0 0 0 O O N O O CO O O NY N CO W o o O O 0 0 0 0 0 0 O o co 0 0 0 0 i'IY= m m o 0 0 m o 0 0 0 0 0 0 0 0 0 ai a) of ai ai w co aO a `�� Z Z O co CT) CO co rn 9) co rn o) O O O rn Co aO O ao ao CO CO CO m m IC = = 40o V 0 m F V/ o Z vv w CV CV a up COco CD O CD n a CO O CD O CO CO CO r C) 0 r N f` O CD Z 0 0 Z v, CD vco.O CU) CO N- O CO (O v CO a- a) O N CO N O CO LO Q O) O CO O a) r` U) M W 4 CO V 4 CO M LO CD U) CO Na)a) ` coM U)CN O CD a) N a) CO N. CO COCD CD CD CD CO n C) LO CO O 23 V N N CO NY LD LO CO CD CO C. r CO a) O N- N CO NY NY LO LO CO F 1a)o a) N N N.: N- N- N- N- N- N- N- N- aD cc 00 0o cc co. C) 00 tri U o m m � a >. M O O O Q' f ) N (O CD CO C O 0 Z Q O 0 0 0 O O O O 0 0 O O O O O C) O O O O O 7 O O O O O O O O O O O O O O O 0 0 0 O O O O L t 0 Y N N N N N N N N N N N N N N N N N N N N N N M ? V) �+ r x— 1— r r r r r r r r r r r r r r r r C LO mm Ct O7 O • Y Y I-- WW O o ✓ V' N U) Co C) CO O N U) V CD O CD N h a) N C- N O CD .i O O r- a) CO O O t` O CO CO LC) N CO U) CO N h 00 V CO C 0 4 h _� O N N CO V CO CO CO N M Cb O O O O N m N N N- N N CD N CO CO CO M M Q) V CO V I- w W_ a0 r` CD CO V CO N N O O O W r CD U) d'V CO CO N N d =S." N N N N N N N N N N N QJ X t0 N O O O O O O O O C) O O O O O 0 0 O O O O O O G W 3 N- N- N- N- C- C- C` N N- C` N N r N. N- n N- N r C` n N N )'▪ m e ,u ti a) O N N CO CO V N CO CO CO NY N 0 4 CO CO O CO 0 Q .. a 0) O 0 N- N ( U1 N- LO MLO v, U) LO a) N U) O O O a C) V O w . 0)C) COmy O C` U) CO O N O r N- U) V CO N Cj CO O O a) V 0).- K S >, D7 N- U) V CD CO CO r� CD U) CD N- N- V n N CO CO CO N! IX Z 0 a c N- N. n C` N- N. N- r N- N- N. CO CO CO C) O e- N- n C) G Q r L. t y lU) U)) Lo LO LO LO 0O LUQ) U) LOO U) LLO05 O LO LOO LLD LOO LOO U) LOO LOO LOO CO) J > Z(% O o= a) rn O a) co rn O O O O O o) co CD co rn rn rn O co CD 0) Z to Lri Lri U) U) LU U) LL) U) O. U) U) U) U) U) U) U) CO U) u) U) U) t 0 Cl a) N CO O N C) CD CO O N CO CO CD N-- CO W LD .- O LO N O r` U) N V CV O CO CO 00 M N CO CA C - CO 4 CO O) a) O C- N V LO O n 'a O N O O O O n U) LC) U) U) V O O CO W U) CO N N N- N M O. N CO U) CO CD n CO O 0) O N CO NY U) U) co CO r y- 9 V V Vea V' V V LU Ln U) LO u) LU lU L() In •)) Ea 7 3 o U U) U) N n CO O U) CD U) LO O CO 'C LO U) V ' to 0_ O ,- 7 0 U) NY CO r N- N Nt O CO C O U) CO v- O N N d. C'] N N_ V O CD O N- O (D O4 CO 4 h O O O O r O O O O O O O N CO W CO O O 07 a) a) O 0) O O O CO CO O O N CO CO CO CO CO V m (n H U) tri U) U) CD CO CD U) U) (o CO O D a CO K) (D (O CO CD CO M (O ( Z O O O N CO V u) U) CD n n 00 O O M U) 00 N- I W I N N. CO CO CO CO CO CO 00 CO CO CO CO CO n CO ,r co ' to r n r- r-: r n r n N- C.: n r N- r r C- CD U) V O C\i 0 7- N- N- n 1 1 7- N- N- N N. N. N- ti N n N- N- n N- U)N Cb a0 00 CO aD CD eo co- CO CO CO CC) aO W CO CO CO aO a0 ao O 00 N- N- r n r n n N. N. CO h N. N. N- CO CO CO W CO N- O N.- 01 O O O O O O O O O O O O O O O O O O O O N O • CO U) CO NCO U) Mui N CO •-• M l- O 03 U) CD N) CO CO CO• CDM N-N CO N CO CO CO CO CO CO N N CU N- CO CO N N N N N N N N N N N N N N N N CO CO CO N N N N N N N N a U) O CO O O CO CO O O O O O O O 0 0 0) v U) O Q O O O O O O 0) O O O O 0 0 0 N •t U) r O 0 N CO O O O O O O O O O O O O O O O O O O O CO CO CO CO O CO CO M CO CO co O O O MO) O O O O CO CO co >. C • CO CO d Q c • o W Q Q f`O'7 f`O') C`O's) 0. O 7 m Z d n. O O O O O O OO O LO N O O O O O O O O O O CO V) O p r C) 0 0 0 0 0 0 O O O i-O O O O O O 0 0 0 O O 1-. O Z o 0 0 0 0 0 0 0 o r` Qo 0 0 0 0 0 0 0 0 0 o Q o 0 O O C) 0 O O LO O O U) 0 0 O O C) O O O O U) O co O O • a 7 V' U) (D N. CO O O O Ch N M V U) CO N. CO O O O O CO CO .C] c u) O ac r N N N N N N N M CO' M .CO CO. M CO. O M M CO M M V .4 V d- ay a c v1 0 E o«m m m Ca Q 0a. (n33o a 1111 W - - M io 0 o co o 0 N U !�c'j m m cd 0 ai oo co ai o 0 `Wb Q Q co co co ao T ao O rn 0 ro m 4x x= m^ o 0 In Z vv 1 C/) �p`m� a CO V V Z N ' O f00, N- N N 0 n a Z cri NI o6 O ,-- a) 0) ? Q co 0 N- n n nCD(0 U) CO M O Q O^ (0 N- W 0) O N CO M N c) 0 0 1--3 O <m y a0 coN O O O COO O O O i.. a"a^ Q' O o co < O a >�— M O O ] < O �Q f0 u) C1 7 Q O O o O o o O O O O 1E :E 0 Y Ni N N Ni N N N N Ni r? z z E u� W m m coE m p TD YY F- 0W o tcs- C., M 0 co o V' n 0 i ! V' 0 M (0 N O O n 0 Cp O 00cc, OO a0 6 Cr) 0 ti 0 m 2 o(C o 0 0 0 0 0 0 0 0 W = N- n n N- N- n n N- n o m o W-- o '. °) 5 u m c =° o m ... N- m 4 m N 0 CO CO (Mn v (0 ,- I (°" O w 0 m () W n M _O a0 4 N O O ,- o ✓ >t m it T R C N co 4 c0 N M d' (C CO L.0) 0 =.• 0 o % O = co In 0 a) a) aa) 0 in in ai C) �` (on 1. z U) 6 V 1. (('i (0 LOU) ((i C a C C7 W o U o.� O OND CO M CO CO CO M a CK 1 O O (0 M V' (0 (0 n n 0 co 0 N 0 0) a0 sr V' co O O O N M co Ca a ui «i (ri co co (n ,.q co (o 3 I- 0 O 0) 0 O n CO (0 00 Na0• O• O (0 CO V- O CO a) 4 W (0 n n O a) cb V- O' (• 00 40') CO n n n 00 c0 co c co N (0 (O (O (O (O (D O (O O .. Q 2 z a) E • to z N- O CO N M M (O N N ao (O co n n 0 ci co W^ n N N CO CO co co 0 co Cl)E m ao ao ao ao ao ao ao 0 O a) y 1 N.- ao 0 CO n CO N- ao 00 01 C C a) 0) 0) O co a) O M O) n O 00 W N O T.. N O 00 O 0 0 N M M M N N N CO M M av m n u� cv ncn • rm� rW vN- n ( O Ov Q co co co cO (O , 06> N N V• a) 0) rn a) ON) a) O C)) C)) U T C N O mE w C v . O Q L Q Q d W a0 O 2 m If) =i 0 zaa � � •,- 000 0 00 0 - p"-'0 N. 0 0 0 0 0 0 0 en o v Q«i 0 Q 3 N co M "t co c0 n a0 co o co00 an0 c..,an0 01 C (O '.0 co O dNVV '' pa. � VC 'a z � � (44) to m `_ i— to o „ • cam a of a) 0 CO 10."mme or uam33o a. o ,- cc, W o0 a z z m m= c N � o > > o Z vv LO � � T-- v @@a Z 0 O m• m0 H i- 0 O mm a C )O O 20 m Q cc cc N m E 0)0) Q 4) OL E 0 ' Co co to to E LU 0 7 m m 0 cc -• T T a) .= 2 Y Y H wW ai () ii C 0 t `m I m 2 Q' C a) 0 co 6 = = a) iii. C 0 'O C U Qat U 92 ,7) 4127-5 , o 2 0 a) U d U a) V- CC arra 1a Q' ix' L a) 1 • > O J F- 2 Z N 0 L O 0 �--a�/) m a c m9 I- of O O >, U m a m a a co CO E > m E 0- @ 0 m 0 a O -- I a 0._O h cv LLco r` CO rnCr)-- Q Q N N N CO r N c0 O CO CO O CO CO LU 10 C) O V CO LO V' O CO CO c- O j v C'') Ci (D 6 (ri CO 4 O CO Lri n (O N- D r (O 10 O) CO N- LO O) V' 3 coW N v_ vv_ LO r.... O V' CO 0 6) CO m l71 2 C) M_ C) C7 C) C7 V' V LL7 (O LL7 (O (O 11111 11 11 iO t C_ f. 0 0 U CO N V' f- O) O) r CO O) LU O (D a LLO C) VC)• LO Lo W co f- V O O- U (OV N O N V' O i•-- V' LU O 1 O O C) V O) O m C) O O O) C%) W Lo V' i J U, �'_O O O O O m 0 C)m r- 2 v(O CD CO (D CO O (O O[O CO (O O t0 t d co I,- CO CO (O V O CO N (n O) N- CO C) r Cn O) CO r O c- LO •- N N N CO (O ,- (n m L V' VO u') N( O) 0 0 0 0 CO N a CO ti CO CO CO N CO 00 N CO N. (0(O CO d- Q a/ W CO CO CO V' 0 I- 1\ r n N. N- N- N- r • Q..-- 47 co W co co co co 00 00 W co co co o0 m V U CO = O CO m m E 01:1 00000 0000 00000 Q O0Q < 0 0000 OOOOOOOOO .0 = 0000 L C) O O O LO O O O O O O O O O yaNO O N O V' n O O LO O LO O O N Z 00 7 VLO LO O Q) Zdd CCi 0 ON O 2 5, ai COm O Co C O= Y om aCa y N E 'o .. d m In m _C li ink D a U o U Øbp North America - ALASKA - BP Prudhoe Bay PB DS 11 11-30 500292248400 11-30A 11-30A Plan 4 Travelling Cylinder Report 23 October, 2014 .'.■ BAKER HUGHES INTEQ BP Kill 0up Travelling Cylinder Report HUGHES INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 11-30-Slot 30 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB DS 11 MD Reference: Kelly Bushing/Rotary Table @ 62.40usft (NABORS 4ES) Site Error: 0.00 usft North Reference: True Reference Well: 11-30 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 11-30A Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: 11-30A Plan 4 Offset TVD Reference: Offset Datum Reference 11-30A Plan 4 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of refer Interpolation Method: MD Interval 25.O0usft Error Model: ISCWSA Depth Range: 11,463.00 to 14,875.00usft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,684.06 us Error Surface: Elliptical Conic Survey Tool Program Date 10/23/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 145.00 11,463.00 1 :MWD-Standard(11-30) MWD MWD-Standard I 11,463.00 11,740.00 11-30A Plan4(11-30A) INC+TREND Inclinometer+known azi trend 11,740 00 14,875.00 11-30A Plan 4(11-30A) MWD MWD-Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 14,875.00 8,680.17 3 1/2" 3.500 4.500 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) Lis DS 02 L2-08-L2-08A-L2-08A 14,650.00 14,225.00 1,571.76 809.20 762.66 Pass-Major Risk Lis DS 03 L3-15-L3-15-L3-15 Out of range L3-23-L3-23-L3-23 12,245.33 11,250.00 1,179.94 262.96 929.63 Pass-Major Risk PB DS 11 11-23-11-23-11-23 Out of range 11-23-11-23A-11-23A 11,472.87 11,800.00 850.77 613.16 311.31 Pass-Major Risk 11-27-11-27-11-27 12,278.38 12,382.89 531.48 227.74 308.15 Pass-Major Risk 11-28-11-28-11-28 13,400.00 12,525.00 1,313.63 645.22 672.24 Pass-Major Risk 11-28-11-28A-11-28A 13,350.00 12,350.00 1,076.68 646.84 430.21 Pass-Major Risk 11-28-11-28B-11-28B 14,150.00 13,025.00 739.90 635.38 104.57 Pass-Major Risk 11-30-11-30-11-30 11,500.00 11,500.00 0.00 2.54 -1.75 FAIL-NOERRORS .,-- Plan Plan Lisburne-Plan Lisburne-Lisburne Wp 1.0 Out of range PB DS 18 18-25-18-25A-18-25A 14,200.00 14,150.00 318.36 8.33 317.98 Pass-NOERRORS 18-25-18-25APB1 -18-25APB1 14,275.00 14,103.00 221.47 6.57 220.99 Pass-NOERRORS 18-29-18-29C-18-29C 14,675.00 15,625.00 905.81 604.38 332.20 Pass-Major Risk Offset Design Lis DS 02- L2-08-L2-08A-L2-08A Offset Site Error. 0.00 usft Survey Program: 2029-MWD,10261-MWD Rule Assigned:Major Risk Offset Well Error. 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wel Wore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NI-S +E!-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°l (usft) (usft) (In) (usft) (usft) (usft) CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 10/23/2014 5:18:42PM Page 2 COMPASS 5000.1 Build 61 T • W 4-w go: 'Y; � :Z 1 i 1 i 1 r i s ;311 I; 4 e. # 4 S 8 1,01 4 8 f ' ! $ _ _ b a � = j = I I _ . 1,- kusn OOZ)(+quoN/(-Amos i = I r, y S� R o U A8 0r, 0 �j' 13 114: p$ $$$88$8osg� — �, a N 1 03a< N Wm'4gggg88�88gg 0 0 }$fir fwmw - 1 CL 8 IWS82=6.72amT,8m8m8 s A�N:i2Mmmmmmmmm e, P '8888888g8000$S S4 i__ ___ i --� R R _ 0 3$ -Nn�..�mo,o-.N,.,a g (u?l8sn OSI)g2daQ lsaq.t°A aniy w UI NIIme gyaa m= . I 1 PP' F1011: SI s 1 i � 8 = I W 1 111 A � , } II 3 3 1m£3 8 EIM 1 - v Hilo I 48 vAA A p- �Q LO r m l 1! 8 N W f e M m ~ 0 698 g 1: fii g- - : !, s 2 � I _ , 2 .4lt 031 I Air __rail- 00 ik • - - !sr ' lig 5 _ 1 I Mira rPil r 7.. A — -r- 411 :9 i : In o� IIIIIf'21P NIF onm , I w e $o¢ ■� ■■fil■i.■ ■■■■■■ ■I fill Cfs _. _____ __ I _.__1111_ N_ _._ __ 8 0 0 ii ,-- 0 0 0 a : a :. - a iP, i a a R a a a li, a .;, E a 'A (ur/isn ooi)(+)quonU(-)iitnos m vi Lu OM 12 0 \Wdj s�22 nass:��n� 7,3'_ m= ; 1811888888888888 5 1 15 '�EE,MgR$B$8$8 0 i ' � 8m888888888888 > _ t __ IM8884GPSV8os" a m = ,ate. i 5 Y� 8 9 9 V o 1;5t83 �aM7=2, 58�E �' dos# V, > > > ¢ Qi a > ; v — a r F gmSmGsigy,s s�3 > o as w > > > > > > > m i ^ � SSS43G$MSGdWGT '',,ro z $R 9 fi 4 9 0 7 ' r N N H n a m - N eryPm �q�!N r�iw !q m��a yq( pP : J J �QQ�55 a $) 3 V 45"a5limmmmmEll + Sb N q Q N N N N en g N M N N ^ .rv^ �^ m 12222 to n " J 7, 2 -r -r 7 a cb Z 2, m y L e ,nrrvinm m rvmry off^: lilVs of of o n of m o •n ui o {{ E PJ :al FIAmV Re o, ! Ep000 J J 4 4 ' q. N til N N N t? N N lrc -nn nf'^ h a f a a 1 1 44444 / a i ! 1 1 1 11111 N 8.888888.888.8888 f �o mainsilla5 N_rv�.mm^mmm_rv�. e G 0 8 8 3 0 LLig =—\ \ c 8 r� �A o � I 0 I C.-7+. . 4 ,11 /// d 2 O 4 O O /% OO NN m" . a) W �O� N - O_. //i!///ln I ; m /iil/ ! 0' I_ / / I � �,11 •� • // t/ /5 _ i � ih ,< 44/-...4.--m...,..---...—,..,----- ,',47/4/jklip,4 ' LT,--. —3; ..„,.. _,..._.s.„.__._...._.---.....—_,......--,...,-, i t , ,../ i i/ . Jo r, .V.--.-___ ___- _--_-.--M M.--.W....,--11- .r - g ati 0 : \!...,..,N,A;;C4-411fiAgggg§gglii07410 - • 0 _—$ i Eb a I !® 1111 111 t LL In prp aI"I i rc 6 O 1'12 P bdamomo U 11 2 52 6 I1 I tl! 2 i ws' 1 u T N — 141 ii ;ill1 Om ,•, a E .. X I 2 0I I I ! m O. — M o o -I1 -NIS m m a elra YMY 4 ills 0.7• I ! I I 3 S $ m 0 • N o 0 a — rc (f� O — V V 0 m m x 1 4 < 1 II 1 Q '' 8I m J• jtt I 1111 III III U. i' 1 -\ 11 - 11 N Z 3 I I I ® __ qv 1'1 I d I 1 It Z o i P > > WE J 1 1 Q 1 " Y III J v I E II. ( N116 Ill I wLL p aO • • 0 ' it U + WI ■ 111WI 11 11C : I N I W IIa t3 W i. • o 1 Y W O 01 " N N 1 = m U re x T + V 9 if WM I— @ _ mg ) 7 a V' i = II 1 Cl 1 i • m y O ., 1 m a $ I I (2 .C2Z 8I 55 11 I y t. Ip + 9 K III P,i ,o.- ..;.-, I 1■ u I t nIg IMit 1'011=11. , I 0 i OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME: PTD: 2 (6 l 797 L Development Service Exploratory Stratigraphic Test Non-Conventional FIELD: rZtei?e,... X1.7 POOL: 6�-erG. -t/ Check Box for Appropriate Letter/ Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI LATERAL The permit is for a new wellbore segment of existing well Permit (If last two digits No. , API No. 50- - - - in API number are Production should continue to be reported as a function of the original between 60-69) API number stated above. In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name Pilot Hole ( PH) and API number (50- - - - ) from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce / inject is contingent upon issuance of a Spacing Exception conservation order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: Production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application,the following well logs are Well Lo in also required for this well: gg g Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 4/2014 Cr) 0 a) 0 0 U) 0 O `o `m )) c Q 0 m c cn 2 N O T w co a a o 0 a o o (V C m In w CO m `C Cr; N Q N w a m O J a - Q Q 0 0 -° - a`) E O -o a m c x COm CO = o CO a CO 0 ami c '3 0 m d ~ U '( ao) - o m o 2 o N _0 n m - w 0 M U O O - w 7 m N O U7 N C 0 a) a m CID J 3 O a O 7 0 > o a 3 au') coi c a c °) CO -mo a) m 0 .N m To .- in c C o a) d N co m o a) .0 -0 N N N > N C. co -.E' COO U O 0 V I- M _ ` i _c -p `O p O V) ca v J in a) _ o co H 2 o o ° 3 ° m CO E a CD_ O E m o '° n Z a d c c O a 0 .N N (n a 0 J a) O N m C a N t° Qo0 oM aa) a O x rn ED N w To 0 EO a) r a) M = O) E Lir co O N m OM T 0 N �, a M .3 c (` O co x 0 Q O CO V E .co N c@ 0) CO 2 J 0 a ° 3 co U `) d ° 0 a 4 p o Q Z _c ° D c c - m as, 0) a o 2 _o a v CC c° c d d N c T N ._ N d N O N N m C 7 fa 0 .N N x E • 2 o < 0 c °) °) m (O c o a ti 0 a @ m 3 3 N c c c r c o co E m c m '� ° o v .- ai o ° w m m m a) o E 0 O p .c o o () > in v .N CO w ami 3 -o O N I V U a) a) U u) o _CO A- d E Z= co o Q M c "o m m 'O _c O O (n - C N CC O Q O 7 7 a °) •C W d N (� m co d U o U 0) a d a x Q a n > w a 0 co a 0) 0) N a `n) aa)) aN) aa)) aa)) aa)) aa)) aa)) a0) < < < < a a a a aa)) aN) aa)) au)) a) a 0) U 0) aa)) aN) aa)) < o 0 Q Q a a_ Z >- >- >- >- >- >- >- >- >- >- >- >- Z Z Z Z Z Z Z Z >- >- >- >- >- Z >- >- >- >- >- >- Z Z >- Z Z Z, T Z" F\ 0 O wcu M T Q o m 0 a 0 N E E 3 - E a) o 0 0 j c a) O V C O Oo ° N L.L. , .E c h a c _c Co Cl" E in it,- o o 0 c.) Q c) o a) E _ 3 O c71. o "O 3 M u) a) Z' O 0 c aci .Z 0 J C 'j m "6 O N o _c Q a) E Om O 1.5 N N a N) a a) O O N a O @ C O O N• 0 d N U v O N 2 a O w J C H; L cm Idi �° moD u.0 `i) nN c O3 .0 40 Q 30 0 M= O O 0oinm2 o OcoC N = Q L 0 < 0 co ) a) °i i Lir 'o o c -° o O C 7° m O a D o ` O m 0 d O) a) ) d N c c N' c O N O Q E E = a c c E o C c F o o �S c d C 0 r a N n S)o 0 Y o o a U o U m ° n o o n o a ° U a c o ai d c@ 3 a > m Y N•N Q Q ° O O C .cC O - O Y 2 0 m o •E '@ I a @ - N "� O O) 0 O C N Et J 0 E n m > s o 0 - - c fl o a>`� o 'm E aa) c 'a 3 n a a) C (U 3 v 3 - E a. a m m m 0 m m -° m ` c a) w °) a 0 ° a 3 0 .c o >, c E c u 0 o a m .3 .3 m O E 7 u, -a m 3 m 2 COMo a 0 ,°n a .� u, 0 3 O m a) o w o O O .� "O C -0 .� N 'Q -o •o (6 O C > N O O C V O •00 a d O ° c -O ° c2n L- a) U Q_ -O N V m o O O 0 E ° ,Y a) o O N _ E a) m E L o O a N C H 0 n -° ,-- ° - ° 0 0 a c c U o n o O a) - -0 0 2 -0 m rn o c c o 0 -° I ° cD E m O O f6 '' @ d N u) N L — 'C 0 0) a 7 7 m N N m O >' 'C - 3 2 (.1) 0 N •O d TI) O �° o n n E N >, 0 a) 0 3 c rn C m 0- 0 a) C c m - 0 Cr n w @ o o 00 a) 0) >, :o a) L.T. d ° 0 — N N N 0 • C N - -0 0 L U C N u) U) m° o 'm 2 c z-,. 0 O U)) 'C o 0 c m c E O o m cocoa) F- w °w' 3 0 0 0 ° o o m E c0i m o C c) 000 ° 00 a) 0 0 m -o m r '� ui a E 3 aci c 0 °) o -° d w m = o 0 0 • m m Q o a o 0 0 > > 3 m 3 0 m m w w ° u) co w a ' m ai J co E N Q - - - O o m E E c - 3 c c mt - t- '� asi a6i ? = d d o E m w CO c m o m c m a) a) ° -° a n a) a) CO 0 - °) 0 0 0 2 2 2 m -° m -o 'o = O O ° °- O m m () a) 0 p V C d J x cn w O O d d U a d z o (n o 0 0 o a U a '• o co co o g a Q (O co U W a O N M V O r 0) C) O N CO q (0 f� W O) O N M V 1)) O °,,S' 0) VEO �- N CO 10 c0 N. W 0) ° `- m 't °° N N N N N N N N N N M M (") (") C) M M M c`') M U v v v c~c 0 0 0 O wG O C "' N N N o 0 lir O o N 0) G OM O• N0 tll m O C O O O.- a J a a`> T 0 E J x* c a Q $ J ° o. a cu 13) U ',ILI 1- -OE p, I-L0) C O. > a) n (n d Q Q w Q 0 Q