Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
214-178
STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS SEP 1. operations Performed Summary: Size: MD: Abandon ❑ Plug Perforations RI Fracture Stimulate ❑ Pull Tubing 11 y� Operations 0114 iG C g Suspend ❑ Perforate 0 Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Rednll ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Mill CIBP, Set CIBP 71 2. Operator Name: BP Explomlion (Alaska), Inc 4. Well Class Before Work 8686 5. Permit to Drill Number: 214-178 3. Address: P.O. Box 196612 Anchorage, Development IZ Exploratory ❑ Effective Depth: measured AK 99519-6612 Stratigraphic ❑ Service ❑ 1 6. API Number: 50-029-20209-01-00 7. Property Designation (Lease Number): ADL 028327 8. Well Name and Number: PBU 09-03A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: 8438 feet 7240 5410 PRUDHOE BAY, PRUDHOE OIL 4104 11. Present Well Condition Summary: Size: MD: TVD: Burst: Collapse: Structural Total Depth: measured 12958 feet Plugs measured 11699 feet 20" true vertical 8686 feet Junk measured 12855, 12857 feet Effective Depth: measured 11699 feet Packer measured 8721 feet 31-5224 true vertical 8792 feet Packer true vertical 8438 feet 7240 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural 188 0 53491607 Gas ❑ WDSPL ❑ Subsequent to operation: 1 GSTOR ❑ WINJ ❑ WAG ❑ Conductor 80 20" 33-113 33-113 1530 520 Surface 2673 13-3/8" 33-2706 33-2706 5380 2670 Intermediate 5205 9-5/8" 31 -5236 31-5224 6870 4760 Liner 3931 7" 5084-9015 5078-8690 7240 5410 Liner 4104 4-1/2" 8852-12956 8553-8686 8430 7500 Perforation Depth: Measured depth: 9021- 12770 feet True vertical depth: 8695-8698 feet Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): 4-1/2" 12.6# 13Cr85 29-8858 29-8558 4-1/2" HES TNT Perm Packer 8721 8438 Treatment descriptions including volumes used and final pressure: 3. No SSSV Installed Representative Daily Average Production or Injection Data Tubing Pressure 265 255 14. Attachments: (required per 20 qac 25.070.25.071, &25.283) 15. Well Class after work: Oil -Bbl Gas-Mcf Water -Bbl ICasing Pressure Prior to well operation: ❑ Stratigraphic ❑ 188 0 53491607 Gas ❑ WDSPL ❑ Subsequent to operation: 1 GSTOR ❑ WINJ ❑ WAG ❑ 306 217 7178 1 1750 Tubing Pressure 265 255 14. Attachments: (required per 20 qac 25.070.25.071, &25.283) 15. Well Class after work: Contact Name: Daily Report of Well Operations m Exploratory ❑ Development p Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil 71 Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Authorized Name: Alatalo, Travis Contact Name: Alatalo Travis Authorized Title: Production Engineer Contact Email: Travis.Alataloti9bp.com Authorized Signature:�� }— fitsi G,y—�+Zry �— Date: d�. /t r{ j / eA Contact Phone: +1 9075645351 Form 10-404 Revised 04/2017 "YOe.Tt SoSmII Original Only ��� 4 RRDMS 1: 'w SEP 2 0 2019 Daily Report of Well Operations PBU 09-03A ACTIVITVnATF 8/21/2019 CTU#8 1.75" CT. Job Scope: Mill CIBP / Depth Log / Set CIBP / Adperf MIRU CTU. MU & RIH with Baker 2-7/8" Milling BHA w/ 3.70" Junk Mill. Bullhead 1% KCL w/ Safelube. Tag CIBP at 10398'. Mill CIBP & Push to TD at 12863' down / 12855' up. Pooh. Unable to bleed IAP down. Call out pump truck to load IA to displace IA gas. Change packoffs /Trim Pipe. LRS load IA with 150bbl dead crude. MU BOT MHA/HES logging bha. Load well with 108bbls of Safelube and 38bbls of 50/50 methanol. RIH. ***In Pro ress*** CTU#8 1.75" CT. Job Scope: Mill CIBP / Depth Log / Set CIBP / Adperf Continue in hole with HES memory gr/ccl inside 2.90" carrier+3.70 JSN. Light tag at 9739', repeated it twice. Wellbore inclination is "uphill" from here on. Turned the pump on briefly at -9739' down to 9900'. Continue in hole without pumping. Turn pump on again 10037'. IAP would continue to climb as we pumped/increased WHIP. Pumped 1.5bpm and jetted to 11000'. Turned pump off and came back up hole dry to original set down in hopes of achieving a smooth dry drift. RBIH from 9000' dry, tagged again in the heel -9650'. Decision to POOH to run a venturi to clean up the debris that is floating around. MU & RIH w/ Baker 3-1/8" Venturi w/ 3.70" Mule Shoe. Work venturi from 9200'to 11900' before tagging. Dry drift clean from 9000' to 11900'. Pooh pumping pipe displacement. Recover small pieces of plug debris. MU & RIH w/ HES 2-7/8" GR/CCL Logging Carrier & 3.70" DJN. RIH and 11850' and log up to 8100' painting orange tie-in flag at 11650'. POOH. Confirm +10.5' correction. Make up Baker 4.5" CIBP and RIH. 8/22/2019 ...Continued on WSR 8-23-19... CTU #8 - 1.75" Coil, 0.156" wt ***Cont. from WSR 8-22-19*** Job Objective: Mill CIBP, Set CIBP, Add Perf RIH with Baker 4.5" CIBP and tie-in to flag. Set CIBP with mid -element at 11 700' MD. Pooh. Top of CIBP at 11699.3'. MU & RIH w/ Sib 2.0" x mega a un. ag CIBP & orrect Depth. Puh & Perforate Interval 11196'- 11227'. Pooh. All shots fired, ball recovered. DSO will POP well. Did not freeze protect Tbg. Well Integrity & DSO notified of TxIA Communication in both directions observed during Coil Operations. Rig Down CTU. 8/23/2019 ***Jab Complete*** TREE= 4-1/16" CNV WELLHEAD= FMC ACTUATOR= BAKERC OKB. ELEV = - 54' BF. B -EV = 7 KOP = 4909' Max Angle = 101'@ 10474' Datum MD= 9222' CON 101' H 40 19.124" 8" CAM STIP 2284' MLLED 6' OFF 9-5/8" CSG, 47#, L-80 HY D 563, D = 8.681" - 2289' r/ 9-58" BOWEN CSG PATCH, D = 9.860" 2289' - 2293' 13-318° CSG, 72#, MN -80 BUTT, D = 12.347' 2706' 11' BKR PBR, D = 7.38' 5084' 9-5/8" X 7" BKR HF61E ZXPN LTP, D = 6.18" 5095' 9-518" X 7' BKR FLEX LOCK HGR, D = 6.17" 5100' 9-5/8" WHIPSTOCK (02120/15) 5236' 9-5/8' CSG, 47#, S0095 J&L, D= 8.681 —5236 Minimum ID = 3.72W'@ 8840' 4-1/2" HES XN NIPPLE ESTIMATED TOP OF CBV-E 7387• TOP OF 4-12" LNR 8852' 4-1/2" TBG, 12.6#, 13CR-85 VAM TOP, 8856' 0152 bpf, D = 3.958" 7" LNR, 26#, L-80 VAM TOP HC, .0383 bpf, ID=6.276" (BTM 2 JOINTS L-80 BTC -MI PERFORATION SUIM4ARY REF LOG SLB GR ON 03/15/15 ANGLE AT TOP PERF: 34° @ 9021' Note: Refer to Production DB for historical pert data -SEE FERE SUMMRY ON PACE 2- 1 1 1 4-12" LNR, 12.6#, 13CR-80 VT, .0152 bpf, D = 3.958" 12956' 09 03A DOGLEG" 5 2 SAFETY 419272* AMGLE>70° @ 9463" MAX 203��4-12" OTIS X NP, ID = 3.813' 9-518' HES ES CEMENTER 2245' CEMEM N OA (02/17/ 2267' 9-518" ECP, D = 8.580" 2419' & 2665 9-5/8" FO (2 EACH) ST MD TVD DEV TYPE VLV LATCH PORT DATE 7 3429 3429 0 WC DONE RK 16 09/15/15 6 4909 4907 10 KBG2 DMY BK 0 03/20/15 5 5649 5803 23 KBG2 DOME BK 16 09/15/15 4 6664 6549 23 KBG2 DMY BK 0 0320/15 3 7272 7106 23 KBG2 SO BK 28 01/08/17 2 7631 7435 24 KBG2 DMY BK 0 03/20/15 1 8195 7955 23 KBG2 DMY BK 0 01/08117 "I nls Wei requires special gas ift valves due to high H2S MILLOUT VVNDOW (09-03A) 5236' - 5250' 8685' 4-12' OTIS X NP, ID —=3-81-37- 8721' 3813" 8721'-1TX4-V2'FIESTM R(R,D=3.856' 8783' 4-12" OTIS X NIP, ID = 3.813" 8840' 4-1/2' OTLS XN NIP, ID = 3.725" 8852' 7' X 5" BKR ZXP LTP W /11' PBR, 03=4 330- 8858' a -i/2" WLEG, D=3.850" ELMD TT NOT LOGGED 8675' 7' X5" DG FLEXLOCK FGR, D= 4.32" 8885' S-1/2" X 4-1/2" XO, D = 3.880" 10341' J�4-12" RA PUP JONi 0377' CTM 4-12" RA RIP JOINT TAGGE 11627' 4-12' RA PUP JOM 11699' 4-12" BKR CBP (0823/19) 12855'CTM FISH:MLLED CBP (0821/11 12857' PLUG MLLED/PUSHED TO BTM 12870' �7D� DATE I REV BY COMMENTS DATE REV BY COMMENTS 04118!76 RWN 34 INITIAL COMPLETION 10/11/16 JTG/JMO PULLED EVOTREVE 10106/16) 12/04190 N2ES RWO 01/09/17 JPKIJMD GLV C/O (01/08/17) 0329A7 D16 RWO 0827/19 JCF/JMD MLLCBPISETFISH/SETCIBP 0322/15 D-14 SN)ETRACK (09-03A) 10/19/15 JLS/TLH SET CBP I PERFS 0927/15 08130/16 JUJMD SET EVO-TRIEVE PLUG (0825/16) PRUDHOE BAY UNIT WELL: 09-03A PERMIT 110: #2141780 API No: 50-029-20209-01 SEC 2, TDN, R15E, 287' FSL & 722' FEL BP Exploration (Alaska) PERFORATION SUMMARY REF LOG: SLB GR ON 03/15/15 ANGLE AT TOP PERF: 34'@ 9021' Note: Refer to Production DB for historical perfdata SIZE SPF I INTERVAL OprwSqz SHOT SOZ 2.88" 6 9021-9031 O 03/19/15 032997 2.88" 6 9021-9031 O 08/11/15 SIDETRACK (09-03A) 2.88" 6 9143-9153 O 03/19/15 08/30/16 2.88" 6 9143-9153 O 08/10/15 2.88" 6 9419-9449 O 08/10/15 2.88" 6 9462-9492 O 08/10/15 2.88" 6 9485-9515 O 0929115 2.88" 6 10070 -10100 O 0929115 2.88" 6 10100 -10160 O 0928/15 2.88" 6 10165 -10195 O 08/09/15 2.88" 6 10235 -10255 O 0928/15 2.88" 6 10255 -10275 O 0927115 2.88" 6 10277 -10307 O 08/09/15 2" 6 11196 -11227 O 0823/19 2.88" 6 11428 -11443 0 03/19/15 2.88" 6 11558-11682 O 03/19/15 2.88" 6 11609 -11633 O 03/19/15 2.88" 6 11800-11815 0 03/19/15 2.88" 6 12160-12205 C 03/19/15 2.88" 6 12432 -12455 C 03/19/15 2.88" 6 12737 -12770 O 03/19/15 09-03A DATE I REV BY COMMENTS DATE REV BY COMMENTS 04/18/76 RWN 34 INITIAL COMPLETION 10/11/16 JTGUMD PULLED EVOTREVE (10106/16) --GLV 1210490 N2ES RWO 01/09/17 JPK/JMD C/O(01/08/17) 032997 D16 RWO 0827119 JCF/JMD MLLCBP/SETFBFVSETCBP 0322115 0-14 SIDETRACK (09-03A) 10/19/15 JLS/TLH SET CBP/PERFS 0927115 08/30/16 JL/JMD SET EVO-TREVE PLUG (08Q5/16) PRUDHOE BAY UNIT WELL: 09-03A PERMIT W:'5141780 API No: 50-029-20209-01 BP Expknafion (Alaska) ® L r T �--- 0) o o ai f0 _' 4 o0WCO v O q y bA N > f0 N ^� a bo 0 F` .Y o v c.E ❑ JZ N .- U `i, O > 1 O z + a c c N O T 4 y� t6 , ttt ,` a+ '5 V. 401 r"o O "6 a ca 7 _E u aj Q C Q C J W 4- r- 4- N- { O S m J r r J tQ t7 T T - - E S -o C N L 0 2 Q 2 co S 3 7 7 _c c C W O @ U L N G IA 2 .�.' Q N O M N M lf) N O� -6 f0 O -0 v r< c 'O O C i - , to O 0 0 0 0 0 0 0 0 0 C t- N L :' d J J J J J J J J J 00 O 4= 0 O >- I- W W W W W W W W W 'y y •C V w H LL LL LL LL LL LL LL LL LL ++ N N N 10 ,. Q J J J J J J J J J O- > ate-, •N t;. H Q Q Q Q Q Q Q Q Q .05 a c ,F w = C a z z z z z z z z z u to 0 ,L ' C LL LL LL LL LL LL LL LL LL CC ^ Jo C > Qj N t O C CU o CJ' z 0 a a) u to U �m O c O co w CO> P. u v GG 0• to c u a 4_, 'o yam; - U = > > < a; a �, c a v (15 < 4.n LL 16 F l0 H N N - � f. O ix W - LL LL CC d' la CD (-)CD 0 a w U O O ~ LL 'V m Q. c N Ix c 00 ce F \ r r� W E a a ci a ai Ian V U co ria U tc0 _1 ro ? 0 tU MI o t`-^ ��yy W O i' > ro 0 tq U _d O J O J J O J J J 01 tdco ra VD C2 K > d > N > > i 0 2 z c, LLI N vii Z 2 2 tv W I 1--V11"111, P YW Q Q Q < < < Q < O 203 Ommm mmm u Q W D W W W W W W W IA Z O Y 0 0 0 O O O 0 O ® 0 2 _< 2 2 2 2 2 2 2 0 0 0 0 O COO W = Z 7 > > D D > > ,._,3, a LL Et IX W tY CetY CetY • O3 O. a a a a a a a ro U U = �V LU CD N COO L)) '"" O V N X N — � C k' N_ O O N N f0 @ LC7 /I OC' 00 O 000 E 1111 V O O O O O O 000 �� 0 O OO O o O O O O N Cm v a o -) a o a A A LU Q wl . 000000 0 0 0 C m ,_ ra oCr m VI r N r CD N CD C O O O O O O O OO a h. v O) CO N h.- ,i) N CO U) to *N E C 0 CO N CC CD 0 4- u rJ O N N O O O O M O O N N N N N N N N N N c- Q 0 N N N N N N N N N N 01 O O O O O O O O O .� O O O O O O O o O ,N 7O N w LC C 1.0 N In In ID L0 1.0 L0 U1 Q u N Li _ _ O =', F O0 U l t - CU .. z Q1 E aa, > Y w Y pC 413 U Q 0 ` C Z Q M V N CO ,a _m Q r NTo cu a� Li) N n Z O N O r0 N M f' d _ a Q O N w p Z p U U Zi. ztil W ro CO Li, H V C 9 t6 c C) ro 0 CA a3 Q H a` a G STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMMI N • REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:Pull Plug Q 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 214-178 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory 0 AK 99519-6612 Stratigraphic A Service ❑ 6. API Number: 50-029-20209-01-00 7. Property Designation(Lease Number): ADL 0028327 8. Well Name and Number: PRUDHOE BAY UNIT 09-03A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 12958 feet Plugs measured 10400 feet true vertical 8686 feet Junk measured 12857 feet Effective Depth: measured 9073 feet Packer measured See Attachment feet true vertical 8738 feet Packer true vertical See Attachment feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 85 20"94#H-40 34-119 34-119 1530 520 Surface 2676 13-3/8"72#MN-80 33-2708 33-2708 5380 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: See Attachment feet q+1 �J 4PP I s 2.01YTrue vertical depth: See Attachment feet S��� Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr85 29-8858 29-8559 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) RECE 12.Stimulation or cement squeeze summary: I VED Intervals treated(measured): MAR 1 3 2111-? Treatment descriptions including volumes used and final pressure: AOGCe 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 86 0 1219 1445 219 Subsequent to operation: 234 537 5755 1766 254 14.Attachments:(required per 20 AAC 25.070.25.071,a 25.283) 15.Well Class after work: Daily Report of Well Operations Q Exploratory 0 Development Q Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature Phone +1 907 564 4424 Date 3/9/17 Form 10-404 Revised 5/2015 r f 2.9/f ���� � �r� e ,, Submit Original Only • • Packers and SSV's Attachment PRUDHOE BAY UNIT 09-03A SW Name Type MD TVD Depscription 09-03A PACKER 2267.36 2267.32 9-5/8" BOT External CSG PKR 09-03A PACKER 5096.03 5089.67 7" Baker ZXP Top Packer 09-03A TBG PACKER 8721.2 8438.75 4-1/2" HES TNT Perm Packer 09-03A , PACKER 8864.09 8563.4 5" Baker ZXP Top Packer • r m Q o 0 0 0 0 0 0 NN- (.0C.0 mNN- vLOL0 0 N V V In N- CO U y o 0 0 0C) 0 CO i M CO I- ti V CO N 7 L.0 CO) CO CO N V' O m LO C0 CO N- CO O 07 CO "Y O CO O) O O N C) CO Lf) f� N N CID CO in N N Lf) CO CO CO H CA 'Cr CO Nr CO I� LO O CO CO CO N O LO N N LO CO }1 Q w Ce, O CO CO CO co 1 O O M N ON O .c N N CO C.) m v- , 1111111 QLO CO CO V CO CO LC) C) CO CO CO N O CO N CY) _ co N LO CO • 12 H W o Ln OO O O T z CO co O 0 0 L3) Ct r i J J COco C 4t � % •� U) C _ V V N NC U LL pO pp a NML� L� � NN M O 4 t LO CD CO LfCO O N C CO CO N O) C) — CO J N N N CO "t CO W W F- Q Q C O _ I W D D 0 U W W cis iou_ W W cwwz zWWWWET) OJHHzzD C.) U) � H • • a> to Ca O N O ,- C�') O I` M Cb N 6) 00 CD m M coin Q CO 15r 0 00 1— s— CO CS) Ln O CO CO r CD y O O co 0 6) O 6) 6) 0) co co 1` N- N O 0) CO N 6) ❑ CO CO Cb CO OD 6) C00 000 C0 Cb 00 00 00 CO OCD CO CO CO CD ❑ H a 0 - 00 M V' 0) N .— 6) CD 6) co N N N- '— c- m L N- CO CO N- O 1- V O V' N 00 — 6) 10 O In 0- CO N (xi CD CO 6) N- 6 NCD M O O a a) 6) 6) N- 00 0) 6) O) 6) 6) 6) D D N- N O O o0 10 O W ❑ CD N- 6) O 0) 6) O) 0) 6) 6) 6) 6) 0) C70 00 Cb N- N- rN 6 p co co co co co co co co co co co co co oD co co co co 00 °O 0 I- w a O• 0 Z w0 w w a a) g g Y U 0 o a m O 0) w Y Y F t c- M C7) Cf) N 11) O O O CC) Cf) 1!7 N- M N M 117 10 CD O co (1) J Q Q 0 0 w w W M O M CO 0 117 N- O 00 M O 10 N- J J .J U 1+ 0 m O V' M 117 ,— N N M V C[) CD oO N V' N- < < < w a a U - (7 ED 0 0 0 0 0 0 0 0 0 0 0 0 CD �— N N N U_ U_ 2U J W J CD Cr) = = = = c- = = = = c- c- = Z Z O J J = 00 a w a EO U U U W g Z ~Q Z • Z2 2 2 O c0) 0) wcUn VQ) + = a o C Q .5 = M 0) N Cf) N O O O 10 117 10 C— OD o0 0) O O N N- O MW m N d -- Cfl 00 0 O 0 N N N V 1() CD CO N- O iococomm 0 m m m m m 0 0 0 0 0 0 0 = N- N (NN L d O = 2 Cr co -1 H 0 co J d 0 C/) 0) co cn 0) a , 8 CL 0 o• aaaaaaaammmmm ncncncnwww EaaaaaaaaaaaaQODaaOam w < mmmmmmmmmmmmmmmmmmm a 0 t a> a F- co• IC) C0 C0 co cD cD M co cD c_D C0 c_D r—c0 CO CD coCD c_D C0 m 7 :7 0 0r r r— c- = = ❑ D D c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W J J Z O N N N N N N N N N N N N N N N N N N N N Z W 1 1 < J W m = 0 0 0 0 0 0 0 CLCD CC0 0 (D 0 0 0 CD 0 CLCD M CD Q W J ❑ J W \JJ ❑ N G. O O O O O O O O O O O O O O O O O O O Z D- 0 J W W CL W Q C] J - J J J D a' a O CO (D ❑ Y WJ JOQ O W W Q Q T] Cl T) 0) LL LL v) w (n a ar E m « « « « « « « « « « Z CO O O M M M M M M M CM O M O M M m M M M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Co 0 u) 0!) i i i i i i i , i i i i I i i i LL L1 CO Q LL N LL U' O W Ll 6) 6) 6) 0) 6) 6) 6) O) 0) 0) 0) 6) 6) 6) 0) 0) 6) 6) 6) 6) (b Q a a _J 00000000000000000000 Q < CT) co w w Lo co a Cr • • • Packers and SSV's Attachment PRUDHOE BAY UNIT 09-03A SW Name Type MD TVD Depscription 09-03A PACKER 2267.36 2267.32 9-5/8" BOT External CSG PKR 09-03A PACKER 5096.03 5089.67 7" Baker ZXP Top Packer 09-03A TBG PACKER 8721.2 8438.75 4-1/2" HES TNT Perm Packer 09-03A PACKER 8864.09 8563.4 5" Baker ZXP Top Packer • • 0 2 a w 0 C » 0 >-- 2 c <(i) E o 0 a) - (/) % duo V - (i) 2 p = .a 3 Q ° e o ! E 2 2 - w / ® W 0 - / �% ƒ � _ i O ± b t o \ < G O - 2 o_ / > � k \ L 2 / / / R \ / / 0U_ / k ± L O A A O U ZZco * < D k Rtlt 5 L \ e e d \ ° > r o_ \ \ \ U TREE= 4-1/16°OW ---11kY NOTES:WELL ANGLE>70'@ 9463"***MAX ACTUATOR= BAKER • -0 3 A DOGLEG:15.2°@ 9272"*'* OKB.EIEV= 54' 20"CONDUCTOR, —j 101' v I BF.ELEV= ? 94#,H-402030' --f-1/2"OTIS X NP,D=3.813" KOP= 4909' I ''+ Max Angle= 101"@ 10474' ID=19.124" t• Datum MD= 9222' 9-5/8"CASING STUB H 2284' 2245' —I9-5/8"HES ES CEMENTER (RIG MLLED 6'OFF v \ 2245' —ICEMENT IN OA(02/17/15) TOP 02/15/15) 9-5/8"CSG,47#,L-80 HYD 563, D=8.681" —I 2289' 2267 —9-518"ECP,D=8.580" 9-5/8"BOWEN CSG PATCH,ID=9.860" —I 2289' -2293' * 2419'&2665 —I9-518"FO(2 EACH) I\ _13-318"CSG,72#,MN-80 BUTT,0=12.347" —1 2706' ST MD TVD DEV TYPE VLV LATCH PORT C)ATE _ 7 3429 3429 0 MMG DOME RK 16 09/15/15 11'BKR FOR,D=7.38" --F5084' 6 4909 4907 10 KBG2 DMY BK 0 03/20/15 9-5/8"X 7"BKR HRD-E ZXPN LTP,D=6.18" H 5095' �. 5 5849 5803 23 KBG2 DOME BK 16 09/15/15 • 9-5/8"X 7"BKR FLEX LOCK HGR,D=6.17" —1 5100' 4 6664 6549 23 KBG2 DMY BK 0 03/20/15 3 7272 7106 23 KBG2 SO BK 28 01/08/17 9-5/8"WHIPSTOCK(02/20/15) —{ 5236' 2 7631 7435 24 KBG2 DMY BK 0 03/20/15 9-5/8"CSG,47#,S0095 J&L,0=8.681" —I ^-5236 1 8195 7955 23 KBG2 DMY BK 0 01/08/17 'This wel requires special gas lift valves due to high H2S Minimum ID = 3.725" @ 8840' 4-1/2" HES XN NIPPLE MLLOUT WINDOW(09-03A) 5236'-5250' ESTIMATED TOP OF CEMENT —I 7387' + w .* s 8685' —I4-112"OTIS X NP,0=3.813' I I I . w " :4 a } i� 8721' --I 7"X 4-112"HES TNT PKR,D=3.856" . r 4, { 8763' —14-1/2"OTtS X NP,D=3.813" 'C * 8840' H4-1/2"OTIS XN NP,D=3.725" Y :i Y TOP OF 4-1/2"LNR 8852' •4 8852' --17'X 5"BKR ZXP LTP w/11'PBR,D=4.330" *. ' / 4-1/2"TBG, 12.6#,13CR-85 VAM TOP, —F9-956' t...7' ; 8858' H4-1/2"WLEG,D=3.850' 0152 bpf,D=3.958" 1;. . ---I ELMD TT NOT LOGGED ~ .� 8875' —17"X 5"DG FLEXLOCK HGR,D=4.32" *7". .: .+ ..** , 7"LNR,26#,L-80 VA TOP HC,.0383 bpf, H 9015' 1--24:: .•� 8885' 1—5-112"X 4-1/2"X0,D=3 880"l D=6.276"(BTM 2 JOINTS L-80 BTC-M) + RI H4-1/2"RA PUPJONT 10377' CTM —14-112"RA PUP JOINT TAGGED(09/26/15) PERFORATION SUMMARY • 10400' —I4-112'COP(09/27115) a'. i+ REF LOG:SLB GR ON 03/15/15 w ANGLE AT TOP PERF:34"@ 9021' Note:Refer to Production DB for historical perf data '► SIZE SPF NTERVAL Opn/Sqz fSHOT ( SOZ 11627'Ig: _j—{4-1/2"RA PUP.IONT 1 3. '4 -SEE PERF SUMMARY ON PAGE 2-- ` M I 1 I I 12857' H PLUG MLLED/PUSHED TO BTM(09/23/15)1 • +' 12870' —I MIDi'.4...*.+4.+ 4-1/2"LNR, 12.6#,13CR-80 VT,.0152 bpf,D=3.958" — 12956' —_ i"'+� 1r+.� DATE REV BY COMMBNITS DATE REV BY CM/RENTS PRUDHOE BAY UNIT 04/18/76 RWN34 IMTIAL COMPLETION 10/11/16 JTG/JMD PULLED EVOTREVE(10/06/16) WELL: 09-03A 12/04/90 N2ES RWO 01/09/17 JPK/JMD GLV C/O(01/08/17) PERMIT No 42141780 03/29/97 D16 RWO AR No: 50-029-20209-01 1 03/22/15 0-14 SIDETRACK(09-03A) SEC 2,TION,R15E,287'FSL&722'FEL 10/19/15 JLS/TLH SET CEP/PB2FS(09/27/15) 08/30/16 JL/JMD SET EVO-TREVE PLUG(08/25/16) BP Exploration(Alaska) •� , r 09-03A • i i 1 1 ': r E 1 i . li 1 c7 PERFORATION SlAMARY :* REF LOG:SLB GR ON 03/15/15 k I I ANGLE AT TOP PERE:34°@ 9021' `� Note:Refer to Production DB for historical perf data 2 a:~ SIZE SPF INTERVAL Opn/Sqz SHOT SOZ # cy 2.88" 6 9021-9031 0 03/19/15 i+ 1 2.88" 6 9021-9031 0 08/11/15 :t *' .# 2.88" 6 9143-9153 0 03/19/15 1 1 2.88" 6 9143-9153 0 08/10/15 .4 2.88" 6 9419-9449 0 08/10/15 r 2.88" 6 9462-9492 0 08/10/15 t 2.88" 6 9485-9515 0 09/29/15 w % " '` 2.88" 6 10070-10100 0 09/29/15 4,2*2.88" 6 10100-10160 0 09/28/15 4,* *�! 2.88" 6 10165- 10195 0 08/09/15 2.88" 6 10235-10255 0 09/28/15 2.88" 6 10255-10275 0 09/27!15 ► ,..-47s." 2.88" 6 10277- 10307 0 08/09/15 ". I I 2.88" 6 11428-11443 C 03/19/15 2.88" 6 11558-11582 C 03/19/15 I I 2.88" 6 11609-11633 C 03/19/15 * 2.88" 6 11800-11815 C 03/19/15 w 2.88" 6 12160-12205 C 03/19/15 2.88" 6 12432-12455 C 03/19/15 * 2.88" 6 12737- 12770 C 03/19/15 * %v, Y DATE REV BY COMMENTS . DATE REV BY COMMENTS PRtJDHOEBAY IN'l 04/18/76 RWN34 INITIAL COMPLETION 10/11/16 JTGIJMD PULLED EVOTREVE(10/06/16) WELL: 09-03A 12/04/90 N2ES RWO 01/09/17 JPK/JMI) GLV C/O(01/08/17) PERMIT No:' 141780 03/29/97 016 RWO AR No: 50-029-20209-01 03/22/15 D-14 SIDETRACK(09-03A) SEC 2,710N,R15E,287'FSL&727 FEL 10/19/15 JLS/TLH_SET CEP/P RFS(09/27/15) 08/30/16 JUJMD SET EVO-TREVE PLUG(08/25/16) BP Exploration(Alaska) STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMMI N REPORT OF SUNDRY WELL OPERATII S 1. Operations Performed Abandon ❑ Plug Perforations EZI Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:Plug for Control n Zone l 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 214-178 3. Address: P.O.Box 196612 Anchorage, Development p Exploratory 0 AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-20209-01-00 7. Property Designation(Lease Number): ADL 0028327 8. Well Name and Number: PRUDHOE BAY UNIT 09-03A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 12958 feet Plugs measured 9073/10400 feet true vertical 8686 feet Junk measured 12857 feet Effective Depth: measured 9073 feet Packer measured 8721 feet true vertical 8738 feet Packer true vertical 8438.75 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 85 20"94#H-40 34-119 34-119 1530 520 Surface 2676 13-3/8"72#MN-80 33-2708 33-2708 5380 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr85 29-8858 29-8559 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): RECEIVED Treatment descriptions including volumes used and final pressure: SCANNED ) "' 1AR132017 13. Representative Daily Average Production or Injection Data A,C.) oc Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 294 989 6547 1754 251 Subsequent to operation: 86 0 1219 1445 221 14.Attachments:(required per 20 AAC 25.070.25.071,&25283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory 0 Development Ell Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil El Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature Phone +1 907 564 4424RSDNIS Date 3/9/17 Form 10-404 Revised 5/2015 III3/ /7-- yf Fi tli G zo Ii Submit Original Only Age i '97(/' • s Q o 0 0 0 0 0 0 mNO � LU � N LU N- M U ,Z 0 0 0 0 0 0 0 i M CO N- N- M N MIOCOMMNO m ,— LU O O N- CO O) O CO V O (O O) OMNMWM r.- NNMCOLO NNLOCOMM 1 1 1 1 1 1 1 H 'Cr t O7 t M t CO N- IC) O) MMMNOLON N In CO 4..1 ‹ C E O O M N- N N O O cO O 0 NNLOMNCO nc i lllll Z NI- LOM M V CCOO OD IC) O) M M M N O 00 N % N LU 00 M W W O O lO O 00 \ T z CD CIOCODOO M M MI 1C 2JJ00 _� 024: 0'* * �* �* M I.L C - ooMMO - - - N (N N r 0 a ON r) Ln L CV N M O O 44 N- (O C) M NO Ul) N C 00 (O N O) 6) '— O J N N N M ct M WW —< < Cl— w00 •- 0Uww 0 0 LL [ta c 22 0 z0wwwwm 0DHHz_ zJ 0 w z z J J ,_ • d N f6 m CN- NN ' ON0 '- ) O MO NOCOCOM (OLD L M r- Nr C! co N — co r- O) CO O M 00 'Tr Ns O O C) CO CA CA O CA CA O) CO CO N- N- N O CA 00 N CA O f� CO CA CA 6) O CA CA 0) 0) CA CA CA 00 00 N- N CO N- CO O CO CO CO Co co O) CO 00 OO CO CO 00 CO 00 00 CO 00 00 CO a O F- CO M V O) N ,- O) CO 0 C1O N N N- = = M L M M O O V N r- CO O) CO O CD M N 00 Cfl 0 CA v- V O N 0 M o 0 0 0 C) O) O) N- OO O) O) O) O) 6) O) CX) CO N- N O O D CO NO W ▪ CO I- CA O) CA CA CA CA O) O) O) O) CA co co CC) N- N b O oo CO OD CO C 00 00 OO CO OD CO m CO 0o D C7O ao CO CO °D 0 W 0 cc w 0 p Z W W 0 W g g 0 W U0 0 Q m O O W Y Y I0 M 0) CO N CO O O O LJ7 CO CO N- M N M LO CO CO O J Q Q W w M oMCo0CDNO ' C") C) C N- -J J J cn ++ a M CO '- Ll 0 Ov N N M v- CO 00 N V (N 0 0 0 W O J 0 C I a) 0, 0, 0 0 0 0 0 0 0 0 0 0 0 .- (N N N _U _U _U J LU W a u) . . . . . . . . Z Z Z 0 00Ed d O U 0 0 WII I Z 0 Z t 4-an= a C Q w i— M O) N LO N o 0 o Ln Cn CO N- 00 CX) O) 0 0 N I- M a N V a-- CO CO 0) O M CO M CO I- N CO 0 0 CO M M O 0 0 0 0 0 0 0 0 0 0 0 0 0 = = ' ' N N N cv• W Q 2 O (I) cn cn N v) aW „ 4▪ aaaaCLaMO_ MMM D LO O aaaa. d Q M OO m m m m m COM M CO m m m M M 00 m m a 0 t a, a m I- 0 CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO 0 :.7 :9 0 c o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W J J Z O N N N N N N N N N N N N N N N N N N N N Zi-L1 1 < JJ W .� ,- CO CCOO aDM M M COM CSO COCOCOCCOO XICCOO COCCOO COM W JJ O JJ J ;1, , N `y = o 0 0 0 0 0 0 0 0 000 0 0 0 0 0 0 0 Z O_ :, , 0 l W W w W O. 00 = = = = = = = = = c- a- = = = = = < 0 J i- J J D J D O CO DYDY W -I 3 .7 0 W W Q Q m a b co LL LL :n u_ fn a cc C) E @ Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Z M M M M M M M M m M M M M M M MMM m M 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 cn i i i i LL 0_ CO O LL_ N 2' u_ 6) O) 0 O) O) O) O) CA O) O) O) O) O) O) O) O) 0 c)!) CA 0) 00 a 0_ 0_ 0 J 0 0 W a 0 0 0 0 C) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q Q CO coLL CL C/) V) a a' • S Packers and SSV's Attachment PRUDHOE BAY UNIT 09-03A SW Name Type MD TVD Depscription 09-03A PACKER 2267.36 2267.32 9-5/8" BOT External CSG PKR 09-03A PACKER 5096.03 5089.67 7" Baker ZXP Top Packer 09-03A TBG PACKER 8721.2 8438.75 4-1/2" HES TNT Perm Packer 09-03A PACKER 8864.09 8563.4 5" Baker ZXP Top Packer . • • O co I– o b2 k o / o m ® / CD o k E / � / / CC a n 7 G / E e n m cC k � �/ / ƒ p2f 0 h (13 � co ƒ / / 00 < z E 2 s_ 2 a d (1)- 0 � c / / >, � � \ O � —H $ _ �? O « � 2 2 E)c 8 in z o \ O D 7 Tvm ƒ ai < A Ci / E >_ % \ $ / 2 :t I- 2 � \ � co / . / / co 90 \ 7 < - R co O 2 < 0 0 �� R \ E \ ƒ e / / C \\ / 3 CL ± ; 4 © / / D H a G E , / ƒ / \ / p O �1 y _ c VSVS 66 L00 0I.o co0LW \ / aza � \ f � ƒ_ � ƒ - \ D \ W / ƒ WD Z >ILI " / � iri / ƒ / / cn — c., ^ ^ > \ _ @ O R Q L 2 J CD / © ZZZ / Q0H \ / ƒ / iJJJi /i $ i / ± < co o e 0 / / d /\ / \ 10 CO 0 CO CO CO < TREE= 4-1/16"CNV • 09-03 ADOGLE{)N NOTES:WELL ANGLE>70'@ 9463"...MAX WELLHEAD=. FMC ACTUATOR= BAKER C @ 9272 "' OKB ELEV= 54' 20"CONDUCTOR, - 101' * I BF. ELEV= ? 94#,H-40 2030' -14-1/2"OTIS X NP,D=3.813" KOP= 4909' ID=19 124" t ' w Max Angle= 101°@ 10474' to Datum MD= 9222' 9-5/8"CASING STUB 2284'- 2 2245' H9-5/8"HES ES CEMENTER (RIG MLLED 6'OFF v TOP 02J15J15) 2245' - HM N {CEOA(02/17/15) 9-5/8"CSG,47#,L-80 HYD 563, D=8.681" -_LLW2289'�_1 ►. 2267' --i 518"ECP,D=8.580" 2419'&2665 -{9-5/8"FO(2 EACH) 9-5/8"BOWEN CSG PATCH,ID=9.860" -I 2289' -2293' I\ 13-3/8"CSG,72#,MN-80 BUTT,D=12.347" 2706' ST MD TVD DEV TYPE VLV LATCH FORT DATE 7 3429 3429 0 MAG DOME RK 16 09/15/15 11'BKR Ft3Ft,D=7.38" H 5084" 6 4909 4907 10 KBG2 DMY BK 0 03/20/15 9-5/8"X 7"BKR HRD-E ZXFN LTP,D=6.18" -I 5095' I 5 5849 5803 23 KBG2 DOME BK 16 09/15/15 PI" 1 'i 9-5/8"X 7"BKR FLEX LOCK HGR,D=6.17" - 5100' 4 6664 6549 23 KBG2 DMY BK 0 03/20/15 3 7272 7106 23 KBG2 SO BK 28 01/08/17 9-5/8"WHIPSTOCK(02/20/15) H 5236' 2 7631 7435 24 KBG2 DMY BK 0 03/20/15 9-5/8"CSG,47#,S0095 J&L,D=8.681" - -5236 1 8195 7955 23 KBG2 i DMY BK 0 01/08/17 'This w el requires special gas ift valves due to high H2S Minimum ID = 3.725" @ 8840' 4-1/2" HES XN NIPPLE MLLOUT WINDOW(09-03A) 5236'-5250' ESTIMATED TOP OF CEMENT - 7387' + r +' 4 t 8685' H4-1/2"OTIS X NP,D=3.813" t▪ ' I '+ .' ' rt— 8721' 1-17"X 4-1/2"HES TNT PKR,D=3.856" ;' + I , 8763' H4-1/2"OTIS X NP,D=3.813" i ' w8840' H4-1/2"OTIS XN NP,D=3.725" '' .4 4, .- C; 4' .* TOP OF 4-112"LNR - 8852' *, t ! 8852' -I T X 5"BKR ZXP LTP w/11'PBR,D=4.330" / 4-1/2"TBG, 12.6#,13CR-85 VAM TOP, H 8856' i• * 8858' -14-112"WLEG,D=3.850" 0152 bpf,ID=3.958" :. . H ELMD IT NOT LOGGED * *r + 8875' Hr X 5"DG FLEXLOCK HGR,D=4.32" �v .4 4 +' '. . 8886' 1-5-1/2 X 4-1/2"XO,D=3.880 j 7"LNR,26#,L-80 VAM TOP HC,.0383 bpf, - L { 9015' _I Y _4.444 I I D=6.276"(BTM 2 JOINTS L-80 BTC-M) I i� ..' 1''''''4..:. . 10341' H4-1/2"RA PUP JOINT 'k73 y'-J Evoii evc_.P►vf 1264 6 r 10377'CTM H4-112"RA PUP JONTTAGGED(09/26/15) PERFORATION Sl1M+AARY $ 26 + 10400' -14-1/2"CEP(09/27/15) :i' a REF LOG:SLB GR ON 03/15/15 4.' ANGLE AT TOP PERF:34°@ 9021' ., Note:Refer to Production DB for historical perf data + . StZE SPF INTERVAL Opn/Sqz SHOT SQZ ► T+ 11627' -14-1/2"RA PUP JOINT - ..v -SEE PERF SUMMARY ON PAGE 2- I I I w 4, r 12857' H PLUG MILLED/PUSHED TO BTM(09/23/15) , �►4 12870' H PBTD 4'.'.4444.:►. '4,4.4.4`..',,+`.•. 4-1/2"LNR, 12.6#,13CR-80 VT,.0152 bpf,D=3.958" - 12956' w.: :�. DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 04/18/76 RWN34 IMTIAL COMPLETION 10/11/16 JTG/JMD PULLED EVOTREVE(10/06/16) WELL. 09-03A 12/04/90 N2ES RWO 01/09/17 JPK/JMD GLV C/O(01/08/17) PERMIT No:'2141780 03/29/97 D16 RWO AP1 No: 50-029-20209-01 03/22/15 D-14 SIDETRACK(09-03A) SEC 2,TION,R15E,287'FSL&722'FEL 10/19/15 JLSRLH SET CEP/PERFS(09/27/15) 08/30/16 JUJU) SET EVO-TREVE RUG(08/25/16) BP Exploration(Alaska) I M J 1 09-03A e I y 10. I 1 + I\ PERFORATION SUMMARY REF LOG:SLB GR ON 03/15/15 4;1* I ;* ANGLE AT TOP PERE:34°@9021' ,!. .. Note:Refer to Production DB for historical perf data !� *4' SCE SPF INTERVAL Opn/Sqz SHOT SO2 + 2.88" 6 9021 -9031 0 03/19/15 * ' 2.88" 6 9021 -9031 0 08/11/15 + ' Ar 2.88" 6 9143-9153 0 03/19/15 .' 2.88" 6 9143-9153 O 08/10/15 4� 2.88" 6 9419-9449 0 08/10/15 .04 + ii,* 4, 2.88" 6 9462-9492 0 08/10/15 2.88" 6 9485-9515 0 09/29/15 ' f 2.88" 6 10070-10100 0 09/29/15 * 2.88" 6 10100- 10160 0 09/28/15 * ;*+* 2.88" 6 10165- 10195 0 08/09/15 + +; 2.88" 6 10235- 10255 0 09/28/15 2.88" 6 10255- 10275 0 09/27/15 it: 'I 2.88" 6 10277- 10307 0 08/09/15 v 2.88" 6 11428-11443 C 03/19/15 9 6 73' 'I-14 ' 6"vo it ie, .e. y 8 ZS 2.88" 6 11558- 11582 C 03/19/15 ( I 2.88" 6 11609- 11633 C 03/19/15r 2.88" 6 11800-11815 C 03/19/15 +' 2.88" 6 12160- 12205 C 03/19/15 4-.. 2.88" 6 12432-12455 C 03/19/15 2.88" 6 12737- 12770 C 03/19/15 `► Y 44 t", M Ike ti DATE REV BY COM+AI3gTS DATE REV BY CONVENTS PRUDHOE BAY UNT 04/18176 RWN34 INITIAL COMPLETION 10/11/16 JTG/JMJ PULLED EVOTREVE(10/06/16) WELL: 09-03A 12/04/90 N2ES RWO 01/09/17 JPK/JM)GLV C/O(01/08/17) PERMIT No:' 141780 03/29/97 D16 MO AR No: 50-029-20209-01 03/22/15 D-14 SIDETRACK(09-03A) SEC 2,TION,R15E,287'FSL&722'FEL 10/19/15 JLSTTLH SET CEP/PERES(09/27/15) 08/30/16 JUJMJ SET EVO-II-&VE PLUG(08/25/16) BP Exploration(Alaska) • 4110 -1 -1 5 3% WELL LOG TRANSMITTAL DATA LOGGED PROACTIVE DIAGNOSTIC SERVICES, INC. q Atl./201(0 M. K.BENDER To: AOGCC RECEIVED Makana Bender 333 W. 7th Ave SEP-08 Suite 100 Anchorage, Alaska 99501 ACC (907) 793-1225 RE : Cased Hole/Open Hole/Mechanical Logs and/or Tubing Inspection(Caliper/MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Merion Kendall LR2-1 900 Benson Blvd. Anchorage, AK 99508 gancpdcObp.com �� � "Q1f „ 0 2.0 and ProActive Diagnostic Services, Inc. Attn: Ryan C. Rupe 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245-8952 1) Production Profile 24-Aug-16 09-03A BL /CD 50-029-20209-01 2) Signed : ✓ vO Date : Print Name: PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAx: (907)245-8952 E-MAIL: PDSANCHORAGE(5 MEMORYLOG.COM WEBSITE:WWW.MEMORYLOG.COM D:\Achives\MasterTemplateFi les\Templates\Distribution\Transmittal Sheets\BP_Transmit.docx • • Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable 4 b direct inspection of the file. _4! 4- - 1 7 ' Well History File Identifier Organizing(done) ❑ Two-sided ❑ Rescan Needed RESCAN: OVERSIZED: NOTES: olor Items: ❑ Maps: Li2fayscale Items: ogs: ❑ Poor Quality Originals: ❑ Other: ❑ Other: BY: Date: I OOP S /s/ nif Project Proofing BY: C Maria) Date: 1 (//0/15-' lQ /5 /s/ Mt) Scanning Preparation 5 x 30 = `5 v + 7 =TOTAL PAGES /£ 7 th /5"-- (Count does not include cover sheet) a BY: Maria Date: /s/ Production Scanning ��-QQ' Stage 1 Page Count from Scanned File: (Count(Count does include cover sheet) Page Count Matches Number in Scann'ng Preparation: VES NO BY: 411=10 Date: ( ' /0//3"-- /s/ vii Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Stage 2 Additional Well Reports: YES NO TOTAL PAGES: Digital version appended by: Meredith Michal Date: /s/ Final Page Count: Stage 1 + Stage 2: TOTAL PAGES: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: Is/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc • • ws o oo , ' N to ' • . N O Z Z (p -O C C• 0) 0 0 ° ° _ U c) OIL U O o O m @ N C C CO C C "O N NO Z C (n (n 0 .>'. a) y 0 . (1)) &) (n -° NIL N NIL N IO/2 I E 73 N U N M M m .M N'O U a U U 0 U LL U U J U U a°U) cis p O }I m m 6 O N o2 o•O o❑ o a) o a) a)a a)LL o ct 10 0 O N O E a a 'O U) (0 co a) u) O u) (n U) O co U) .T. T o rt, a) mai a�U O o OE O ❑ O2 0 O o OLL Oa O a) O aci i Z D mm mvi (o ° cn a-o a- -27)2 ua c7)-2. 0) J u)O F. U cci❑ ori N >ly > O >2 > p > 74i 5 o) 5 o 5 N 5 c Q C m LL isig ED < 0 M Q M 2 M °U C) m M 12 < J < m M 0 C) @ o g -< O❑ Oo O cD O ° O"- O 0 o a) O � O2 o @ U 156 a)2 m O m E 0)ct 0) O m0 m13 o) a O) -o 0) O J 2 O N U) Z, (n r o J co co cm c2 O 2 O. co co 00 U O, ❑ O C@ ° @ ° a)cn N J a) m a) O a)LL N N N O N a N y LL 0 ? ' a) ❑ O Ili it ' EW IL❑ LLO ES! LL � LLQ W LLdIL o E0 '21) ° a 9 > °Q v o U g o o) Y LL E,.c .E .c co v, .c oo .c.):....E N .c - .c• .0❑ .0 `O .0 .c C ❑ 0 to ° 2 m o O o C o O C 0 ° O O 2‹ 2 °) 2u) O(n 2<-' N co O) U U O O O_ < in V1.5 Z •2 �'O os• o -t5 o E - Lo oN o� o� 0p -co 0 -oo Q a) y 00 m a) m a) N a) o a) a) x- a)❑ a)❑ 0> 0> 000 ce E. E Mu) Mu) w(n❑ w(n wU Mo wco w2 w2 MI- MI- E22 m o Op c V coco a Y ; 0 0 0 0 0 0 0 0 0 0 0 0 W P CO •> N N N N N N N N N N N N COTS O o o (0 co co (0 co (0 co co co Q d —JCe m O' V V v V V v 7 a 4q._d W W 4' U J = _ UO. O O v Q OIii o m n U) w N O co 0 To (n O) J o. Z CL m c ZI C 'L•' N O_ G w N O G Q N N (A U) 0) O 1-s-1 Q °' r E ' n 0M U ;, U mco c o Jc o M z' Q -o cLt O ct 16 O. o «) O m Z 5 z O z J G N W /�� co To' o ao < N CV O J (n m M0 �p O a ) z v/ ' 0 (n c w Q a ° I 0 °zI vi Q z° o o W Q d U o ❑ E J Z g m m m m m m m m m m m m d dm m m m m m m m m m m m co E ED 0 0 0 0 0 0 0 0 0 0 0 co CO Z m m m m m m m m m m m CO Oe • m m 'p_) '_p) _p) 'p_) '_p) .2' 'p_) 'p_) 'p_) 'p_) .� ❑ Z C _ 'Cr, O ❑ ❑ ❑ ❑ ❑ O O ❑ ❑ ❑ ❑ CD CO > O J d v v v v v v v v v v v .1- N. "5 ,0E H . O CA co on co co Cn O CA O m O d i) ;o, E (0 (0 (0 (0 co co co co (0 (0 CO (o 7 Q z = C N m O if> l0 IO (0 IO IO l() Lo LU LO in LU N 2 cG 0 0 O W O z N N N N N N N N N N N N ° a O E LL a. m 0 o 15 c re G ON J Z W 2O 0 0 0 0 0 0 0 0 0 0 0 E = Q N o a u d Ho .2 a ❑ 0 0 0 0 0 0 0 0 0 0 0 re O F WJOF W W W W W W W W W W W 0 0 c 9 e N r o J O •LL • • m w .-f X N J O O = C a• C C p C X • O @ p O N Z In LL t()JO O l° lC) m a> N J CO CO J E N0 m coi o co) �� vi w o v of v of LL p 9 2 m Z o Z Z o Z p U U X m EO H 6O I- d p) cn N N J f/)oo -0 f/) U) O (/)o c c 7 m O o CD F O ZI o W Z W J• O ce O 'O O O� OLL O o OLL LL LL U ani z oa ow a w Z Z Z I U 2 N c°) (7d N oo U o U U c�I c�I 2I WI LLI p w Y. >y >� > o) > � > o a a LE it (n < a)� m� U) U >- < a-o Q Q ° a N a a a a a a m O O O O 6 O m mo M. M J Mcl M ° M M M M M W LLN LLN N N O N W 90 0•y 9g o 92 o 0 0 0 0 C) -O 0 0 al o) a)606c mo mo 6-0 o) o) o) o) a) 0 o p p o)p a>> O J oW 0 o O ° 0 ( 0a) 0 o a) 0 0 0 0 0 = Ua Ua oa oa ma m p LL v 0 co Co moo co co co 0 V O o 0 •0 .. •ai•0 CD 0 O ai 6 6 6 6 p mo mO ai0 ai0 ui0 p ? I.L a LL Ili Il Q Il Il D. LL Il Il LL 0 F--I a H LL f-I V- I-I LL HI C oho o-° 0g 0� 0.0 0 0 0 0 x o� 0g 0g 0g 0g vg ao� a) m 'C a •C m 'C C C C C o C C 'C 'C rn •C U •C U C U .c U C U E :° o a o m o 0 o w o f o C 0 0 0 o X 00 Wp o N o w O w o m ° " 0 Wp E Q � 02 0O C) 15 c) vp 15-- 15 15 15 15 0 �a i)• 5 I 1a1 5 I vat va O oO op op o a) 02 o o m o W a)M o() oM a)M mc) W V Q w2 w2 w2 DI-- 01- M = M w M My Ni WO wo Mo Dom w0 (\iS O Z 0 O 0 0 to In 0 0 0 0 a d .a CL U ,•-• 0 0 0 0 0 0 0 0 0 0 0 0 0 0 £ (/) o W q N_ N_ N_ N N N NNNN N N (N N N CO ICO (_O CO CO CO CO CO CO CO CO N N N N N N Z V Vim' . V V V V 4 4 4 0) o) a) a) 1.1Jw Q. Q• 0-. OL C fl' I d U a. J m Q a) Za) Id. C j ` coO O o O D CO r- J 0- a Cup L o Co rn C C o f o co Co 0 a) to G O a) ON a E V M Z O ° a) JN Q Mcc O o.. 0 0. o O z Cc) z 0 1 m 5 D N < N M m M C O o III m Cl) p to (A p Q _ Ce 0 ! LT) Q C n Z ° Q N co d 0 C C as u) Z mm CO m CO m CO.9 .9 .9 .9CO `m m m m m m a) a) ' co m m co m co m m co co -° m m m m m U 3 m 0 0 0 0 0 0 0 0 0 0 ai 0 0 0 0 0 ai c C0°O m CO m CO m CO m CO m CO I m o m m W0 m O 00 rn rn o) o) rn rn _o) m _o rn o o_) o) o) o) rn o0 m o 0 1p p p p p p p p p p J a a a p p J E CO > V m- 'a mr V mr m- m' m- mr V _Lo to o o o _� 0 n O) O) O) O) O) O) 0) 0) O) 0) 0) ! C CT O CO O O CO O CO (O O CO CO N N N N N N O to L() O CO CC) In CO l(7 CO (I) CO CO O CO CO CO 1 N N N N N N NNNN N N N N N N N 1c N Q a) E E p 0) cn N z w0 w 0 0 0 0 0 0 U U U U 0 0 0 0 0 0 0 IV O 4D 0 11a 0 0 0 0 0 0 0 0 0 o a a 0 0 0 o i) 0. 2 W W W W W LU W LU W W J W W W 01 W J i i o „' - N O Q _ Ch o Z } } } F N U ISI y coa O 2 t T I V1 p a 01 N A ow Z t L o U d Es m a) _o U• U J ✓ 9 II 2 � ( co f6 rT >- l6 co t71�1 G IX a 22 co w O 0 o m Omco I LU 2 IX o a) `° a it E LU W co - w rn w m rn a V m o E- J ZL `� fn .2 fn Q w O. CoO N ° J a ° I 3 _ J a so = o 02 0 0 Ca � o l G N O a E c4 H r, V1 0 p) a)° I o - } 0M Q o ° °7C1 C.) a o H• 1° o a7 C N CO a3 COQ N • m E ' W m M O F E W 7 O a) C• '= N d //� • co w V/ ? as c pIlk as Q O. C \ - @ p • �p O. ° a Q a a ° as a Z E ° T 0 0 £ 0 O 2 O CO I Z To Lo v 3 o 0 pp N N 0 N CO WN M 0 p W o I >, ~ WE• co 0 a) 0 p o H 3 N W -C c H N al re 0 E. Z 17, E 2 ai > a op Q a> as W m w 0 2 w p N ', Q o o Q o 0 U 71 co 1 U "_' a g o a a CO 13 E a C7 E O E o o .c E a) ° E £ a 2 Z 0 d 0 10 0 c 10 0 STATE OF ALASKA • •ALASKA OIL AND GAS CONSERVATION COMMI, iN REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate ❑ Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate LI Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 5(1- � G/ P Pl vv.-- 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 214-178 3. Address. P.O.Box 196612 Anchorage, Development p Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20209-01-00 7. Property Designation(Lease Number): ADL 0028327 8. Well Name and Number: PBU 09-03A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 12958 feet Plugs measured 10400 feet vt' true vertical 8686 feet Junk measured 12857 feet OCT r 2 0 2015 Effective Depth: measured 10400 feet Packer measured See Attachment feet l 1 N true vertical 8960 feet Packer true vertical See Attachment feet + V Ct Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 85 20"94#H-40 35-120 35-120 1530 520 Surface 2676 13-3/8"/2#MN-80 35-2710 35-2710 5380 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr8 29-8858 29-8558 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 96 0 6053 1545 232 Subsequent to operation: 208 169 3827 1750 438 14.Attachments:(required per 20 MC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations l3 Exploratory ❑ Development p Service 0 Stratigraphic ❑ Copies of Logs and Surveys Run 0 16.Well Status after work: Oil IBJ Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature idat (44,r- Phone +1 907 564 4424 Date 10/20/15 Form 10-404 Revised 5/2015 V TL I c,/ z-/6 RBDM&IlL j 1 1 2015 Submit Original Only . . _ -- . — . • Packers and SSV's Attachment PBU 09-03A SW Name _ Type MD TVD Depscription 09-03A PACKER 2269.14 2269.1 9-5/8" BOT External CSG PKR 09-03A TBG PACKER 8720.52 8438.14 4-1/2" HES TNT Perm Packer • • CU o 0 0 0 0 0 0 N- CDCD '- c - Lr) CO I- N v Ln Ln C N dr dr LC) I- 00 U y 0 0 0 CD CD CD CD i CO CO N- N CO N 7 Ln CO CO CO N V CD m '- LC) CO CO N- CO O O O Ln cJ N CD CO •- 6) N 0) 00 LC) N I- N N CO CO Ln N N LC) 00 CO CO I I I I I I . H CD Lf) in CO co co LC) O) M CO CO N O Ln N N LC) CO Q� O O 0.) M I` CD CO N N N O O 00 S N N Ln 6) A O V 0 dam , I I I I I M < 0 Ln Ln CO CCO CCO lCD 6) CO CO CO N O CO N 0) N LO CO O • M W O O Ln d coo o Cb CD OZ000O 00 "C O CO 00 = d = *k *kJ *kk .N N V CO CO (O N O - - - N N N CO CO CO _ U OM Lo N N c 6) 6) r t Ln co O LN C) O N C CO CO N 6) 6) A- CO J N N N CO 'Cr CO W W FC — — 0 W 0 0 LLJ LLJ DQ2 C7 O 0 W c D D Z Z Q W W W W Qp O 0 H H Z Z 0 0 W z Z J J H • • _ CD m c- O N 0 T— 00 O -4 r- M ODD V N CD 00 CO M eh QD 'CrM 1.0 p_ M T- 4 (O co V N 4c y- O) LO O M OD r- y O O O O) O O a) O a) CO co C` N- N O O) CO N a) p N- co a) a) a) O 6) a) a) O) O) a) a) CO 00 N- f- LU N- (D p 00 00 00 00 00 O) CO CO CO 00 CO OD 00 CO CO O CO 00 CO H a O I- 00 M - O) N- — a) (9 a) 00 N N N y- rt .- c.O z N- M M N- O y- 4 O Cf' N y- 00 '— 6) LC) O = L1) M a 4 M N O M M a) v = 4 O N (O y- M O M O D N O) a) N- OO 0) 0) 6) a) O) a) OD OD C- N O O OD Ln N O W o (9 N- a) W a) a) 6) O) a) W a) O) a) M (b 00 N- N- LU LU LUODCOCOCO DOD ODMMMMLOMCDMMMMao 0 2 w o 0 o w z w w p W o N Q Q J o w U 0 m O O < 00 Y Y H ct r c'') a) LU N L O O O LO LO L[) N- M N M LC) L() C.() O J Q Q w w i M LO 4 CO 6) c- C) M CD O) L() N- O V OD M O LC) N- J J J a s Cn Z a d O r- �' t?' N N M M CO N Q Q Q W C 7 - C7 = p O O O O O 0 0 0 0 0 0 0 0 �- — N N N 0 0 0 J w w 0 J J oz o o a o a 20 0 0 W Z OQ Z C) M 2 2 2 O c) c) ai N cn •w• �i a Q c = O M O) N Ln N 0 0 0 LO L.O Ln N- OD M a7 O O N N- O N .Y M m O C- O M (O ('!) LO N- N LC) 0 0 (.O M M O M O CD CD cn CD CD CD CD 0 0 0 0 0 0 0 � LU co Lo co N N N � aCD Oo cn Y = 00 a J a O cn (n cn cn cn a 0 0 LL LL LL LL LL LL LL LL LL LL LL LL LL U) U) U) U) (n U) U) d QQQQQQQQQQQQ < COMM COMM a 0 t d a F- Q• U) Ln LO Ln LO U1 L() Ln LO Lc) L() Ln LP Ln In In LO L[) Lf) LO o :� :� c 0 0 0 0 0 C) 0 C) 0 ,, 0 0 O O O O C) O C) W J J Z O N N N N N N N N N O N NON N N N N N N Z1 1 Q JI W c- O O O a) O) a) M OD a OD N- N- O W JJ JJ J V N LL �- N N NN N N N N NN N N N N N a 9 W :D U JJ W W LL w W \ \ \ \ _ _ \ \ M \ \ 00 _ \ \ \ \ \ \ Z J a co 00 co O) a) a) a) a) a7 O) a) cn a) O7 a) (T a7 a) Q -I J � I- J -I D CY a O (T] O i D W J -I C1 W W < Q 7o a ]o cn LL LL ;n w cn a 0_ 0 E `° < < < < < < < < < < < < < < < < < < < < M M M M M M M M M cM cM M M M M MMM M M 999 co0 0 0 0 0 0 co0 0 0 0 0 0 0 0 0 i i i i i i LL a (n O LL N 0_ w a) a) rna) a) a) a) a) rnma) a) a) a) rnrna) a) a) a) m a a a 0 _' C! CI w a O O O C) O O O O C) O O C) O O O C) C) O O O Q < CO a) w w (n (n 1 1 • • T?) Z.•as >' O V) N o c 0 RS 't - i- co 0 a) ° _ �_ 3 D a ° a) 3 aci 3 m °� O rn U t LO c 3 CO c a O ,- u0) m 0- > 2 ;� a. d 0)'c 0) 0- o Q c0 ° N c w- N• U ° N UCO ° * u0i rn� c •U N • ° a) 3 co o) N o `n ° 3 a c o o a a) cn � � o � N a) � o � ° � � a� � a) Q * rn o 0- as a) * 0) o o a) N c a cn c Q ° o ° as E * c * 0 m 0 a o CD c 25 T O ( a o -8 in 'c 0 * 0) o a) = c'r) 0 Et 0) c c m m _0 u 0 a 0 to O N 0 co o 0 ° a a) N a3 4 0 0 a) C m `° c o d Q c >o v rn d CD o a) o� c- > E cn fY m d•3 0 * E c m 00 Q O- Q �' a); CO -0 c 2 3 . . - o • ) a) 92 o a°i cn 3 > `° as 0 ° * E N E o z E N 0 - u) a3 N co• m a) a) O c co O F- d N cn o d a) Q as -0 EO H -O . O QE cc- m ° o Y •.-• Q— a) ,� a) c o (n 3 dco U N c > U co MI io CO ° m E as ate) 4-1 eCi < J m e U w * c m 0 0 uo) > vOi i o o d _ > +- N Um =_ N . c U) C/) U c`no c o c° Y p-0 c0 * m o 0 Q. 0LI) _ E U _cc) o .c ioo a) 02 U * = - Q � � i) ° ai m c) `� Ne c u> * � o w > -0 00 � o � * , C 2 6 a) a• oo _a a) ) LU a) _ 3 0.)o o-7:3 cn o in. m o CO > CL U c 7 > — o c O N O N _ E O rn rn 0 * Y •m•= a) N AA ** 2 N c 3 0 N m cc a * m a) _ o as O N N * (A N m E d 't 't U E Q c c) u) 't v m o 7-.-- O. - to cn O N _ 0 a a)> u a) = N 0 _m v v a)* a)> N --17) rn U co ° ` a) c) 3 c6 a3 a) a) c cn N c o o .Q ai N N 0 U co N o -° c u) d d a) .0 "°6 a) d rn N o 0 Q 0 CO ^,CD Q o44U crn � r � F-- -0 a) < a) < ONinQ __ - 454- .-5 m .7) oQ m4IX ° moo LL u 3 ii wO ° - n a) ao _ao o _o ,- o -0DcC _ .Y �' _ m°� Cr >+ U .} > U) oU) > � 000 = 0) U m0 c > a) Ca �- > 5 N C - < F- u) - ?> 3 - F EIi � NY _c rn0 ° cH .� _ � ai � � o CU E i� Q 0 3 a) O • > c Y E O CI d 0 O a) ° c O o la ,_ = o c a _0 d 0 ,_ 4- >'N U) co Q m •c a 0 0 c a° V U o -c 0 c * o w c° . a O 01- -,-, ..OH � E > O c o * F- .- a o .- 4, U 3 a) -OU -aaov 3 L _o ,- c° _ * U 0 -0ON - Qo0 S ~ � � s..) _o3 _00 •c- 0 ib ' 2 S E S — c) O t c@ c * t 'c as = ° 0) co t: (o N c S •E a) S _2 c S 0 Q c . c .3 rn cfl c 0 0 . - v) o c c N i - c 0 _— r c E co c IP co 0_ U F- � m .c , o _ 0- '- in 2 o a) c -- c a) a ° " c to' — ° U 0 0 s _c = o o N o N c v) ° c CO e I� 3 v) a) U 0 ''. �d 'C U I- a) I- ED � U m a c cow as 3 � L U I- 3 � U a) a) 0 Orn a) an 3 ° cow nm o) w Ua) 1kD'- o 0 002 ° oU 3U ...= * 0 U a) a) }c 0 o OY .n0ccoo4* _ .c as _a ct00c -t OD 0 O fY / 2 * c cn corW _a (..) 01: _ p O c a) o CO " F- co * I- * d20 7u) Jcn 2F- * 0 — a) (o (nCL � ° ? cna) H O a) 47 < J021:6 * U * LEa co * QLLQ a3U O E ca =a .g. _ci < < E 0 * < 30 * Uo * W I- Lo Lc) cn LU co LUco LU 0 CD O 0 CD 0 0 CD 0 I- N N N N N N N NCO CO > N N N N N N NI- N co I- CD CD 0) 0) 0) CS) 0) CD 0 Q • • 0 m 15 - Do - a 3 0 *' V _ 0a) 0 m o • )0 ao 0 coU D 0o > c ° D * = a) o � I- O ° o . 0 a) cNi `o o 0 a) o U coo c -0 _c (=S. N- c C C alio c C D c) N CU L m O O CO C) ° O _ U) (A O U) d •c o -) Q O ui d co f0 O d O N `� -_ Q _m `m y a) m 6 Q m aa)) = Q m Q Q °) U ° -0CC � rnN * U E 0 a 3 co C 0 m * O N c co $ N Q O� Ln a) C u) Cl) m u) Co E n .6)D .� o Ca a * a) i a ao d co N d O �' a) ° N ao C co N d - N CO E Hd O m (/) ajH = "O a) O) m � O a) m a) U O m Cn a c 2•ct - (0 'C �' 3 N co a) Q-' 3 Et cn O co O > N 0 d E'_3 a) it) O N E a) H a) m E _~ c i cod -(13 CO Lt o E - 0 0 ccO E F- `°R= E C (7.) Q,o 2 a) N . U l- a) 2 a) a -� 2 2 a) a) • 2 in - 4- Cl-- ° a O c 3 c d CD O 0 co m a) N O_ 'c * CO < 0 ( ( m ,- N- a m ACL Y to - *k O. U _ c" Uin U 20 rnera m CO E° o U CN o ° O 'to 0 O Q = C ai * \ •- m N 0 = o o U = a) o 0 - M � 3 � Ti) * N H � O * D * QC3 o L N 0 _U '° = 0 ,- ** c � rn L Co * O = L▪ nc (n u) °) � �vi Qa : � a * 3 coon * 3 . a) a) t m05 COCOLU O c � . � N . Ln 0 . a : 0 -) a) 0 a O N O '� C a) 0 O * a) Ln o O Co - Q* IP * . o a) * O * v (0 a) * Q _aO D - N "C a) _0 Lo a) ,- O •- N N -° * cin C � ND * _c) Ln ° '6 0 NCCQ _01.) 0) c N \ a) CO ° Dcc) O) QLON \ DNN rnQ � N \ c � QLn ct 3 - +_ O a) - O O - a) 11 C c 7 I U C I I N '3 +' OC c U O I I N L C) r U 0 11 N c a U O 9+ > c U) O > p O (r) N > U) N > CO Q U E o .° can > o U v 1 m 3 0 't 0 � > ° ct U w __ N 2 o 1 U � cEt * o rt 0 - -g CO a) C w U > o a E - a. u) -a `- U - 3 � cc: ID � U � 3 co 0) Cn 0 ,_ - � 0 'c - Ir) E a°) a o o f � 'c C Ln E _ , .0 C Ln E 0 Ln m .0 C C .0 C C D N N7 O c 9 L j O O c D O N O O a) O D o O O * 8 D O O o o o o 0 3 3 0 m z o o 0 § ami . .o a 0 o ai c 3 ami o rn a 1.a) 2 o 0 , E "- 0 1- _c 0, Dau) c) us o0H ...=, 0) 0 ,- . 00H a) = = o - -4=-,*k _0 C L -Q 0 O % C (0 ' '- co _0 U C * C Co d _0 U C 4 c c co_c) U C D0c °0 � ct = cO (u � a ° � UDcc ° O -t ° oUDc .ca) Oc co, � a0* O a) O * v) ) H o I"- 0_N - co I- o O a) o * u) HOOE * (nU * 00_2 : < 3 (..) 0o_ c6 7 (.10 -0 * < * 000 a- U) * < * 000O * Q * Ln Ln Lo Ln Ln L) Ln Lf) O O O O C) O O O CO N- N- CO CO C Cr) N N N N N N N N O 0) 0) O 0) 0) 0) O 0 • • __ / / E 6 E / u) § t I- k _o \ 2• \ - / / as % d E § CL t / 0 / / O Cl ) \ 7 \ \ 2 O i L o \ / - / - / a a a 2 \ 0 c * -0 / / / Cl) t / \ Cl) % 2 E o ' 4 r-) § b / a) ƒ b $ E co E o c c - \ E a) k 0 \ / o ƒ 4- I- O \ 0 \ \ f $ 3 TD 0 t O L o o k E » ± 2 § / 0 0 - - - c = * o M E \ t \ / ) \ 0 � \ : a / 10 * - CD ' 0)c H H1:3 a)t \ \ \ 't \ 3 \ 2 N o G a) o . @ c \ 2 ± o = I I / 0 / ƒ / \ � / \ � 00 / 0 $ 4 / \ ox- - \ / $ co S E R f 2 § E \ / o 5 k a » o O e D c _ r c a % o § \ ® EE7cyo & > o = © _ \ o o e o o / > = 9 5 -Y $ o = = U R / R » q = f 2 $ 2 ® c .§ = U t U q ii ° c 5 0 = D c ? \ rx - ± •e O \ O / @ n _ / / / i < ƒ < 3 / / a 2 ƒ / \ / r 10 r in / / / \ / % / © \ o / / ,- & co ) LC) a a \ \ TREE,-= 4-1/16"CM( • 09-03 A TY NOTES:WELL ANGLE>70.@ 9463 ***MAX DOGLEG:15.2'@ 9272' WELLHEAD= FMC ACRJATOR= EiAK92 C OK&ELEV= 54' 20"CONDU —I CTOR, --INI - :: BE EL EV = ? J - 94#,H-40 2030' —I 4-1/2"OTIS X INV,ID=3.813" KOP= 4909' ' I :-...' ID=19.124" -I 245 _I-19-5/8"HES ES Maxx Angle= 101°@ 10474' is DCASING STUB MD= 9222' 9-5/8'CASSTUB —I nai•---1 ` , ' CEMENTBR ! (RIG MLLE)6'OFF TOP 02/15/15) dir L 2245' —I "1- IN OA(02/17/15) 0 2267' —I9-5/8"ECP,D=8.580" 9-5/8"CSG,474,L-80 HYD 563, D=8.681" —I 2289' Ilig 2419 &2665 H9-5/8"FO(2 EACH) 9-5/8"BO WEN CSG PATCH,ID=9.860' —I 2289' -2293' 13-3/8'CSG,724,MN-80 BUTT,D=12.347' H 2706' ST M) WI) DEV TYPE VLV LATCH PORT DATE 7 3429 3429 0 MMG DOME RK 16 09/15/15 11'BKRFR,13=7,38' —I 5084' I 6 4909 4907 10 KBG2 DIAY BK 0 03/20/15 9-5/8"X 7"BKR HPO-E ZXPN LTP,ID=6.18' —I 5095' 5 5849 5803 23 KBG2 DOME BK 16 09/15/15 • 4 6664 6549 23 KBG2 DMY BK 0 03/20/15 II-5/1X r BKR FLEX LOCK I-IGR,ID=6.17" --I 5100' 3 7272 7106 23 KBG2 DOME BK 16 09/15/15 9-5/8'WHPSTOCK(02/20/15) H 5236' I 2 7631 7435 24 KBG2 DAV BK 0 03/20/15 , .' 1 8195 7955 23 KBG2 SO BK 28 09/15/15 9-5/8^CSG,47#,S0095 J&L,ID=8.681' —I -5236 'This w el requires special gas frft valves due to high I-QS Minimum ID = 3.725" @ 8840' 4-112" HES XN NIPPLE MILLOUT VVNDOW(09-03A) 5236'-5250' ESTIMATED TOP OF CEMENT — 7387' •.,- T. 4' I 861-41 -14-1/2"ORS X MP,ID=3.813" .., 4, er 4,..' -,*. 8721' Hr X 4-1/2'HES TNT PKR,U=3.856' *'. fl'Il I 8763' H4-1/2"OTIS X NIP,0=3.813" --t •• '. 4r' II' 4. 8840' H4-1/2"011S XN NF,ID=3.725" 4 : TOPOF 4-1/2"LNR — 8852' • 8852' —I r X 5'BKR ZXP LIP w/11'PBR,D=4.330" dr4 3.850'6,, = 4-1/2'TBG, 12.6#,13CR-85 VAM TOP, — 8856' ..t 8858' —4-1/2"WLEG,ID 41c! I..Ar .0152 bpf,U=3.958' 4- ..-4 ': —I ELI/D TT NOT LOGGED S.44r:-.‘ 41":': 8875' H 'X 5'DG FLEXLOCK HGR,ID=4.32' 8885' —I 5-1/2"X 4-1/7 XO,D=3.880' 7"LNR,26#,L-80 VA M TOP HC,.0383 bpf, —I 9015' , ID=6.276'(6TH 2 JOINTS L-80 BTC-M) 10341' —14-1/2"RA PUP JONT 10377' CTPA H4-1/2"RA PUP JOINT TAGGED(09/26/15) PERFORATION SUMMARY .4 10400' —14-1/2"GBP(09/27/15) 4r: REF LOG:SLB GR ON 03/15/15 ANGLE AT TOP PERE:34°©9021' Note:Refer to Production DB for historical pert data :'.4 -4,,, 1162r H4-1/2"RA PUP JONT SIZE SPF INTERVAL Ccm/Sqz I SHOT SQZ ,'-4 -i,. IF:4:• -SPE FERE SUMMARY ON PAGE 2- •,,I I I I I I 12857' — PLUG MILLED/PUSHED TO BTM(09/23/15) I :41'. •*4: ...4. A' 1".. ' PBTD ,. ArH *-7,...•47, 12870 :k:4::'..t::,.V• 1,... 4-1/7 LNR 12.64,13CR-130 VT, .0152 bpf,ID=3.958" —I 12956' --:41'iip.:zta.c. DATE REV BY COMKENTS DATE REV BY COMENTS PRUDHOE BAY UNT 04/18/76 RAIN 34 INITIAL COM PLE11ON 08/24/15 JTC/JM) SET CIBFIREPBRFS/ADPERFS WELL: 09-03A 12/04/90 N2ES FIND 09/23/15Jk*A/JMD GLV C/O(09/15/15) FAT No:' 141780 03/29/97 D16 RNO 10/19/15 JLS/1LH PALL PLUG(09/23/15) . AR No- 50-029-20209-01 0312015 D-14 SIDETRACK(09-03A) 10/19/15 JLSITLH SET OOP/PERFS(09/27/15) SEC 2,TION,R15E,287'FSL&722'Fa 04/01/15 JT/PJC FINAL ODE APPROVAL 04/08/15 JT/PJC PEW LOG INFORMATION ADDED BP Exploration(Alaska) •a 09-03A 0 i 1 -%4 I '' I I k4 rit CE 4 411 I\ [ 1 -7 r- PERFORATION SUNIARY ... 4.— REF LOG:SLB GR ON 03/15/154.1 I I P,'*,. ,-. ANGLE AT TOP FEW:34°@ 9021 4, Note:Refer to Roduction DB for historical perf data V, SIZE SW NTERVAL Opn/Sqz SI-IDT SQZ ,.., I 2.88" 6 9021 -9031 0 03/19/15 2,88" 6 9021 -9031 0 08/11/15 . 2.88" 6 9143-9153 0 03/19/15 t I I :' 2.88" 6 9143-9153 0 08/10/15 2.88" 6 9419-9449 0 08/10/15 1•.' .4, 2.88 6 9462-9492 0 08/10/154, ,, , f; 2.8r 6 9485-9515 0 09/29/15 /4,-' 2.88" 6 10070- 10100 0 09/29/15 • 1 2.88" 6 10100- 10160 0 09/28/15 '4L' 2.88" 6 10165- 10195 0 08/09/15 2.88" 6 10235- 10255 0 09/28/15 a 2.88" 6 10255- 10275 0 09/27/15 I. -...4., 2,88" 6 10277- 10307 0 08/09/15 4 2.88' 6 11428-11443 C 03/19/15 2.88 6 11558-11582 C 03/19/15 2.88" 6 11609-11633 C 03/19/15 288 6 11800-11815 C 03/19/15 2.88" 6 12160- 12205 C 03/19/15 2.88" 6 12432-12455 C 03/19/15 6*, 2.88" 6 12737- 12770 C 03/19/15 *. ,14 1 .* .4: , I lig DATE REV BY 0011104ENTS DATE REV BY COMENTS PRUDHOE BAY UNIT 04/18176 MN 34 IMTIAL COMPLETION 08/24/15 JTCJJM) SET CIBRREPERFS/ADPERFS WELL: 09-03A 12/04/90 WES RINO 09/23/15 JA&VJMD GLV C/0(09/15/15) PERIM.No: 141780 03/29/97 016 FM10 10/19/15 JLS/TLH PILL PLUG(09/23/15) API Isti: 50-029-20209-01 03/22/15 D-14 SIDETRACK(09-03A) 10/19/15 JLSITLFI SET CIBP/FIERFS(09/27/15) SEC 2,TION,R15E,287'FSL&722'FEL 04/01/15 JT/PJC FINAL ODE APPROVAL 04/08/15 JT/PJC FEW LOG NFORM4110N ADDED ____ BP Exploration(Alaska) 03 0 a �� _ o C wlliw aa)) NU-❑ r r r r N r r r r r r C u _0 O N W ; T. �1�i./ -�O CD • a) ro N F Y 1= O- , Y CN! od z v v o I- v L C � z tip " F' >, 0 EE u a u i., > _ a 2O O -IIa co ? Q Q in 0 ❑ J W Ill 1.0 In in C N in N O r O r r r r N ra O a) E E F O a > j m > > > j ' C) o0 C ° cu CI v,• I- c- 9 A 0 r• N N N ' O cn w - > ,,, Z, Q Cco a) Q• a) Z cc ❑ o -0 Ea) w 0 tom' , N > Y rn 3 U L s 6 CO D ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ C a) CJ UJ J J J J J J J J J J J W W W W W W W W W W W aA = cc O O F- LL LL LL LL LL LL LL LL LL LL LL 7 a) E 'O '^ O ? Q J J J J J J J J J J J Q O C v CA F- Q Q Q Q Q Q Q Q Q Q Q C = C) Q Z Z Z Z Z Z Z Z Z Z Z U -0 9 ❑ LL LL LL LL LL LL LL LL LL LL LL a) L ;- C> a) E - To v al L u O E O O Z Q U vU i.N O c o .n C a) �' r ,9_ a -(T.) a) , w co J H > > C LO ��+Uj U U g Q ate) s Ou > ;.4 0 n20001= 0021- -10 N a s _ a cn u a CO a s w a o v Q w Ce a) m U > c a H m a o U 4) W o a la a1 m O >- > } >• r >- 1 c4 x5 v 00 CC 08 000 ao o. 0 0 0 0 J O O J 0 0 0 co c° M z z 2 E 2 2 2 2 E 2 2 W u W W W W w W W W W ❑ l"-- III" >- >- >- >- >- >- >- >- >- >- W Q Q Q Q Q Q Q Q Q Q 2 CO CO CO m m CO 00 m CO m 00 Q W W w R w w W W w w w Z 0 0 0 Q 0 0 0 0 0 0 0 ❑ 2 2 2 J 2 2 2 2 S S 2 —t00000000000 I ) LumnDmmmmon �+ CC CC Ct CL cecectccrect CC +0.. a a a n. LL O O Q O Q13 Ct c 40 Y In v, ui �.)) ❑ O T. 4- o N oC O_ O O r r o O Q co K 0 O 0 0 0 0 0 0 0 0 0 0 V1 :� O 00 ° 0 ° 0 0 0 0 0 _ Q c.i L) C9 0 0 2 N 2 2 ❑ O S U .= Q C.D > 'ry' N X > m > > To Q > Q p ❑ U U U U U U ❑ ❑ U U co v 0 AS a o 0 0 0 r 0 CO s vii `� � LLo 0 CO O (0 0 0 0 0 0 0 00 C M c) 7 cn0 r ooo O 0, in ..-.•e' V '7 M N CO c0 CO N 0 N M 'Cr 0 M N O N M To N N N 0 0 0 N 0 N }' N N MM ...a...a > N N N N N N N N N N N N m N 0) O) O m O T O) o T O) O) E C N N N N N N N NN N N Q1 0 0 O 0 0 O O O O O O OO O O O O O O O O O co N cocoN co N u) an N N coU) N a.' a+ m =. +�+Ef co ce o C Q6,1 1 -co W W cc C.J .N o rn 1 e . . QQJQNM cpQOMOTo CSN L 0 �r m ro z M `- O 0 0 O• O N O to (D LA c4imam O„. Q N W co a CJ ' S C7 O O E Z cu 73 0 0 C fiLeoacn F a m STATE OF ALASKA ' SKA OIL AND GAS CONSERVATION COMM ` 41141EPORT OF SUNDRY WELL OPERATIO 1. Operations Performed Abandon 0 Plug Perforations ® Fracture Stimulate 0 Pull Tubing ❑ Operations shutdown 0 Suspend 0 Perforate ® Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool ❑ Repair Well 0 Re-enter Susp Well 0 Other: 5{1— C /RP b- 2. J2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number• 214-178 3. Address: P.O.Box 196612 Anchorage, Development B Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: ' 50-029-20209-01-00 7. Property Designation(Lease Number): . ADL 0028327 8. Well Name and Number: PBU 09-03A 1 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: k PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 12958 feet Plugs measured 11500 feet AUGft true vertical 8686 feet Junk measured None feet G 2 5 2015 Effective Depth: measured 11500 feet Packer measured See Attachment feet true vertical 8814 feet Packer true vertical See Attachment feet AOGCC Casing: Length: Size: MD: ND: Burst: Collapse: Structural Conductor 85 20"94#H-40 32-117 32-117 1530 520 Surface 2676 13-3/8"72#MN-80 30-2706 30-2706 5380 2670 Production 2952 9-5/8"47#L-80 2284-5236 2284-5224 6870 4760 Liner 3931 7"26#L-80 5084-9015 5078-8690 7240 5410 Liner 4104 4-1/2"12.6#13Cr8 8852-12956 8553-8686 8430 7500 Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr8 29-8858 29-8558 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 113 5784 1566 276 Subsequent to operation: 8 0 2080 1611 204 14.Attachments:(required per 20 AAC 25.070.25.071,a 25.283) 15.Well Class after work: Daily Report of Well Operations 0 Exploratory ❑ Development m Service ❑ Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: • Oil IZ1 Gas 0 WDSPL ❑ Printed and Electronic Fracture Stimulation Data 0 GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Summerhays,Nita M(WIP:.•Technologies) Email Nita.Summerhays@bp.com Printed Name Summerha s, ' - M 'IPRO Technologies) Title Petrotechnical Data Manager / /fir/ Signatur- '/ , / .00, Phone +1 907 564-4035 Date 08/25/2015 Form 10-404 Revised 5/2015 1- / RBDN► Submit Original Only M Daily Report of Well Operations PBU 09-03A ACTIVITYDATE SUMMARY Coil 9, 1.75"X 19180' coil, 40.9 bbl. Objective: Drift, PPROF, SCMT, Contingent CIBP, Contingent Perfs MIRU CTU#9. MU/RIH w/3.7" drift nozzle. Tag TD @ 12863', flag pipe 50'above TD @ 12813'. 8/6/2015 Job in progress Coil 9, 1.75"X 19180' coil, 40.9 bbl. Objective: Drift, PPROF, SCMT, Contingent CIBP, Contingent Perfs RIH w/SLB PPROF logging tools. Log gas lift survey from surface to 8400'. Log 40/60/80 passes 8/7/2015 as per program. Log 10 min station stops at prescribed depths. POOH / Down loading DATA Coil 9, 1.75"X 19180'coil, 40.9 bbl. Objective: Drift, PPROF, SCMT, Contingent CIBP, Contingent Perfs """" Continue WSR from 8/7/15"""" We have good DATA M/U SCMT RIH W SCMT max OD 2.25". Log Main/Repeat. Flag coil at 11,300 for CIBP run. Confirm data. MU BOT 4.5" CIBP, RIH. APE wants to set CIBP at 11500'/ 8/8/2015 Set CIBP at 11500'set 5k down Coil 9, 1.75"X 19180' coil, 40.9 bbl. Objective: Drift, PPROF, SCMT, Contingent CIBP, Contingent Perfs """" Continue WSR from 8/8/15"*" Change pack offs Perform weekly BOP test. MU BOT ctc/mha, MU 30' 2.88" PJO HMX gun#1, RIH. Perforate 10227-10307. POOH. RIH w/run#2/30'2.88" PJ Omega HMX guns perforate Top 8/9/2015 shot 10165'- 10195' Coil 9, 1.75"X 19180' coil, 40.9 bbl. Objective: Drift, PPROF, SCMT, Contingent CIBP, Contingent Perfs """"Continue WSR from 8/9/15 """" RIH w/run#3/30'2.88" Guns-6 SPF-60 deg-2906 PJ Omega HMX guns, perforate 9462- 9492', pump meth cap while pooh.. RIH w/run#4/30'2.88" Guns-6 SPF-60 deg-2906 PJ Omega HMX guns, perforate 9419-9449 11 bbl meth cap while pooh. MU RIH #5/ 10'2.88" Guns- 8/10/2015 6 SPF-60 deg -2906 PJ Omega HMX guns. Perforate 9143'-9153' POOH Coil 9, 1.75"X 19180' coil, 40.9 bbl. Objective: Drift, PPROF, SCMT, Contingent CIBP, Contingent Perfs """"Continue WSR from 8/10/15 """" RIH #6/ 10'2.88" Guns-6 SPF-60 deg-2906 PJ Omega HMX guns Perforate top shot 9021'- 9031'POOH freeze protect well with 38 bbls of 50/50 methanol. Cut 50'of coil &change pack off s RDMO 8/11/2015 """Job Complete*" Fluids Summary BBLS Type 101 50/50 METH 101 Total 44, lb a, W Ca CO A- O NCO = M N 10 O)CO CO O COM t p_ CO T- V Cb CO 6 O M a0 Tr ti y O O co CA CO N- N O 0) CO VN 0) O N- CO C)) CA O) CD 00 CO N- N op N- CO ❑ CO CO CO 00 00 CO 00 CO OO CO O 00 00 > I- O. 0 I- 00 CO T' CA CO N- c- V '- CO ap t N- CO CO I- N T- O) Ln O v- LU . 0 CO N CO A- CA N CO r- CO O OO 0) CA f- 00 0) N- N O O C0 LU N O O O N- CA CA CA 0) CO 00 C0 N- N- r N- p CO CO CO CO CO CO CO CO CO 00 CO O CO > I- ❑ m W N > m 0 W H w U") I- C'') N M LU LU LU O 2 J W ++ C M Lf) (N C) O V CO M ,— O LI) N. W J (7 N Z W O Nr Cp = M cr LOCO CO N V I� W Q W U J O CA CA CA O) O O N N ❑ ❑ U J ❑ ❑ CDG) W W z 0 J ❑ J W N H2 w Cl=DU-1 d m < < 2 Z co Z ❑ 1- ❑ O waa Q _, Q wOO 0 M (L") U) 2 0 0 0 w cn cn cr O a 1C) 12 C Ci L M CA CAI LU N- CO Co CA O O N I- O = ... N Cfl O N M O O O M M M D O °D.— 0 LU (0 CO N N N M CZa ; w cr 4— cc co J = - oaJ CL- s- - 2 O cn cn co cn CO a 0 0 0 C • L_ u_ u_ u_ u- u_ Ct U) U) (1) U) w w is 0 o_ d d o_ o_ W d a. O D D a_ m Q Q Q Q Q Q a m m m m m m 0.O t a, a o I- D o 'n Ln Ln A- Ln Ln Lf) Ln Ln Ln ❑ 0 C CD CD N C) 0 0 C) 0 0 0 0 0 0 Z W Z W CIS• r- O O O N N N N N N N N O G_ ❑ W N W Q 65CCO CO M CO CCO 0000 0000 CO CO Z ❑ H J J d O CO< < a cW U LW WL¢ a W n a, E `° Q Q Q Q Q Q Q Q Q Q Q Q Q Z M M M M M M M M M M M M M 00 0 0 0 0 0 0 0 0 0 0 0 to i . i i i i i i i i i i i LL. d U) O LL N W W CA C� (� C� CT O OD 0_ 0_ 0- 0 J 00 aim O O O O 0 O O O O 0 0 O O < < CO CO u. LL, co Cn CL Cr . S Packers and SSV's Attachment PBU 09-03A SW Name Type MD TVD Depscription 09-03A PACKER 5084.4 5078.41 7" Baker ZXP PKR/HGR 09-03A PACKER 8720.52 8438.14 4-1/2" HES TNT Perm Packer 09-03A PACKER 8852.18 8553.28 5" Baker ZXP Top Packer TREE= aw WELLHEAD41/16 FMC 4111 09-03A , . "TES:WELL ANGLE>70- 9463""MAX �. _.. r+r -;15.2'@9272'"' ACTUATOR= BAKER C OKB ELEV= 54' 20'CONDUCTOR, H 101' A e OP ..... 4 94#,H-40 1 1 2030' J--I4-1/7 OTIS X MP,D=3.813' D=19.124' I i' Max Angle= 101" 10474' r# •l Datum MD= 9227 9-5/8'CASING STUB -I 2284' 1 I �� 2245' H9 5/B"HES�5 CIDuB�fTH� (RIG MLLE)6'OFF 1- 2245' I-CEMENT IN OA(02117/15) TOP 02/15/15) ill/� 2267' -9-58'ECP,D=8.580"1 9-5/8'CSG,47#,L-80 HYD 563, 13=8.681' --I 2289' .0 2419'& 2665 -9-5/8'FO(2 EACH) 9-5/8'BOWEN CSG PATCH,D=9.860' -2289' -2293' 13-38'CSG,72#,MN-80 BUTT,D=12.347' --I 2706' ST M) TVD DEV TYPE VLV LATO-I PORT DATE 7 3429 3429 0 MAG DOLE RK 16 05/13/15 111'BKR FBR D=7.38" H 5084' 6 4909 4907 10 KBG2 CNY BK 0 03/20/15 9-5/8'X 7'BKR HRD-E ZXPN LTP,D=6.18" - 5095' I ` 11 , 5 5849 5803 23 KBG2 SO BK 20 05/13/15 9-58"X T BKR FLEX LOCK HGR,D=6.17' -4 6100' 4 6664 6549 23 103G2 DMY BK 0 03!20/15 3 7272 7106 23 KBG2 CON BK 0 03/20/15 9-5/8"WHPSTOCK(02/20/15) '- 5236' 2 7631 7435 24 KBG2 DMY BK 0 03/20/15 1 8195 7955 23 KBG2 SFMG BK - 05/13/15 9-5/8'CSG,47#,S0095 J&L,D=8.681" - -5236 high I-QS 'This w el requires special gas ift valves due to Minimum ID = 3.725" @ 8840' 4-112" HES XN NIPPLE ML LOUT WNDOW(09-03A) 5236'-5250' ESTIMATED TOP OF CEMENT 1- 7387' „?tt I I--41/7 OTIS X NP,D=3.813" 1 1 41c 8721' HT X 4-1/2'HES TNT PKR,D=3.856" .. 1 1 I 8763' Ha-lir OTE X NP,D=3.813' 1 ' 1 8840' 1-4-12"OTIS XN NP,D=3.725" TOP OF 4-12"LM -1 8852' t / �! 8852' H7'X 5'BKR ZXP LTP w/11'PBR D=4.330" I 4-1/2'TBG, 12.6#,13CR-85 VAM TOP, -1 8856' 1 +4 I~ 8858' -4-1/7 WIG,D 0' =3.85 0152 bpf,D=3.958' . J I 1 —ELMD TT NOT LOGO 4 8875' -T X 5'DG FLEXLOCK HGR,D=4.32' T LNR,26#,L-80 VAM TOP HC,.0383 bpi, - 9015' le 8885' H5-12"X 4-12"XO,0=3.<<.+I- D=6.276'(BTM 2 JOINTS L-80 BTC-M) --- 10341' 1-{4-12'RA PUP JOINT PERFORATION SUMMARY FRET LOG:SLB GR ON 03/15/15 47- ANGLE AT ANGLEAT TOP PET:34"CO 9021' r I 11499" H412'CBP(08/08/15n Note:Refer to Production DB for historical perf data SIZE SPF INTERVALOpn/Sgz SHOT S07 « 1162T 1-4-12"RA PUP DONT -SEE PERF SUMMARY ON PAGE 2- I I i' .' B1 12870' - PD e;. 4-1/2"LNR, 12.6#,13CR-80 VT,.0152 bpf,D=3.958" 12956' . , DATE REV BY COMbENTS DATE REV BY COMMENTS FRIJHDE BAY lilT 04/18176 MN 34 INITIAL COMPLETION '05/27/15 SI HAD GLV CIO(05/13/15) WELL: 09-03A 12/04/90 N2ES F&O 08/24/15 JTOJMD SET CiR'FUS/ADPEWS PERIAT t' :`1141780 03/29197 D16 IMO AR Pb: 50-029-20209-01 03/22/15 D-14 SIDETRACK(09-03A) SEC 2,TON,R15E,287'FSL&727 FEL 04/01/15 JT/PJC RNAL OCE APPROVAL 04/08/15 JT/PJC FEW LOG FFORMMTPON ADDED BP Exploration(Alaska) 09-03A S III 1 I :.•-•• t; 18 4 44 '14' II i 4, ‘A!: FORA DON SUNIVARY REF LOG:SLB GR ON 03/15/15 ,"; I “ ANGLE AT TOP FEFF:34° ( 9021 •. Ncle:Refer to Production CB for historical pert data SIZE SW EITERVAL Opn/Sqz SI-IDT SO7 k• ':;', I I .,.* 2.88 6 . 9021 -9031 0 03/19/15 , 2.88 6 9021 -9031 0 08/11/15 . 2..; 6 9143-9153 0 03/19/15 4: I I li.:•' 2.88" 6 9143-9153 0 08/10/15 .v i7 2.88- 6 9419-9449 0 08/10/15 :. 4. 2.88' 6 9462-9492 0 08/10/15 "d,'4 2.88' 6 10165- 10195 0 08/09/15 2.88' 6 10277-10307 0 08/09/15 -e, 2,88 6 11428- 11443 0 03/19115 ...47e 2.68 6 11558- 11582 C 03/19/15 2 ; 6 11609- 11633 C 03/19/15 2 ; 6 11800- 11815 C 03/19/15 '.,‘-..1. 2.88 6 12160- 12205 C 03/19/15 "..-4-.. 2.88 6 12432- 12455 C 03/19/15 zee 6 12737- 12770 C 03/19/15 I IF: ..k..1 -4. ..10, t..* .10, ....,z4i ....; ,...72., 40 h•' , .. _ T DATE REV BY CONSENTS DATE REV BY CONSENTS FRUCHOE BAY UNIT • 04/18/76 WIN 34 INITIAL COMPLETION 05/27/15 STF/JMD GLV 00(05/13/15) MU-. 09-03A 12/04/90 N2ES MO 08/24/15 STC/J14)SET CERREPERFS/ADPETES FERINT No: 141780 03/29/97 D16 IMO AR l•b: 50-029-20209-01 03/22/15 D-14 SIDETRACK(09-03A) SEC 2,MN,R15E,zsr FSL&722 Ra.. 04/01/15 JT/PJC FL OCE APPROVAL 04/08/15 JT/PJC PERE LOG SFORMATION ADCED .. Exploration(Alaska) • � �I Li Hunt, Jennifer L (DOA) From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Thursday, July 02, 2015 3:59 PM To: Hunt, Jennifer L (DOA) Subject: PBU 09-03A/ PTD # 214-178 Hi Jennifer, Please reference the following well: Well Name: PBU 09-03A Permit#: 214-178 API #: 50-029-20209-01-00 Date of Test: 6/27/15 Type of Test: !PT (Initial Production Test) Choke Size: 90 Choke Unit: Production Method: Gas Lift Duration (Hours Tested): 24 Top Reference (Top Perf MD): 9021' Bottom Reference (Bottom Perf MD): 12770' Tubing Flowing (Pressure): 0 Casing Pressure: 1500 Total Test (Rate f/ 0, W, G): 355/6422 /780 24-Hour Rate (0, W, G): 355/6422 / 780 Gravity (Oil, API): N/A GOR (Gas-Oil Ratio): 2198 This well began Production on: 6/27/2015 Method of Operations on this date: Gas Lift 1 RBDMSJk JUL - 7 2015 RECEIVED STATE OF ALASKA APP 2 1 2015 ALA. OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG . C la. Well Status: - ®Oil ❑Gas El SPLUG 0 Other 0 Abandoned ❑Suspended 1b. Well Class 2OAAC 25.105 20AAC 25.110 ❑ Exploratory El Stratigraphic 0 GINJ El WINJ ID WAG 0 WDSPL El Other No.of Completions One - - ®Development 0 Service 2. Operator Name: 5.D Comp.,. usp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. • 3/22/2015 214-178- 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 •2/22/2015 50-029-20209-01-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: • 3/13/2015 PBU 09-03A - 287'FSL, 722'FEL, Sec.02,T1ON, R15E, UM 8. KB(ft above MSL): 53.7' 15. Field/Pool(s) Top of Productive Horizon: 681' FNL, 1837'FEL, Sec. 11,T1ON, R15E, UM GL(ft above MSL): 20.5' Prudhoe Bay/Prudhoe Bay - Total Depth: 9. Plug Back Depth(MD+TVD) 3092'FNL,4003' FEL, Sec. 11,T1ON, R15E, UM .12870' 8690' 4b. Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD). 16. Property Designation: Surface: x- 717691 • y- 5941735 • Zone- ASP4 • •12958' 8686' • ADL 028327- TPI: x- 716606 y- 5940736 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 714512 • y- 5938264 • Zone- ASP4 None 18. Directional Surve Y: ®Yes ❑No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22.Re-Drill/Lateral Top Window MD/TVD: MWD/RES, RES/NEU/DEN/GR •5236' - 5224' • 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT.PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 94# H-40 Surface 112' Surface 112' 32" 300 sx Arctic Set 13-3/8" 72# MN-80 Surface 2706' Surface 2706' 17-1/2" 5700 sx Arctic Set 9-5/8" 47# L-80/SOO-95 Surface 5236' Surface 5224' 12-1/4" 1000 sx Class'G',100 sx Arctic Set,749 sx Class'G' 7" 26# L-80 5084' 9015' 5078' 8690' 8-1/2" 232 sx Class'G' 4-1/2" 12.6# 13Cr80 , 8852' 12956' 8553' 8686' 6-1/8" 461 sx Class'G' 24. Open to production or injection? ®Yes El No 25. TUBING RECORD If Yes,list emach interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD) of Top&Bottom;Perforation Size and Number): 2.88"Gun Diameter,6 spf 4-1/2", 12.6#, 13Cr85 8858' 8721'/8439' 1 ,10�t 111611! 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 9021'-9031' 8695'-8703' 1 Z/�I?,l,I�X WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ®No 9143'-9153' 8793'-8801' ells 11428'-11443' 8823' 8821' :•. DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 11558' 11582' 8807'-8804' ,. 2200' Freeze Protect w/ 153 Bbls Diesel 11609'-11633' 8801'-8799' 11800'-11815' 8783'-8782' 12160'- 12205' 8751'-8746' 12432'- 12455' 8727'-8725' 12737'-12770' 8700'-8698' 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production N/A Date of Test Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period 4 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? El Yes ®No - Sidewall Core(s)Acquired? ❑Yes ®No . If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None Form 10-407 Revised 10/2012 V..7-L / CONTINUEREVERSE RBDMS Submit Original Onl 8 715 �� APR 2 2 2015 ,E o , 4 29. GEOLOGIC MARKERS(List all formations and markers encounter 30. FORMATION TESTS NAME • TVD Well Tested? es ®No Permafrost Top If yes,list intervals an formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Ugnu 5970' 8913' None West Sak 6590' 6481' Coleville Mudstone 7116' 6963' HRZ 8752' 8466' LCU/Sadlerochit-Zone 4 9012' 8687' 42N 9100' 8760' 42P 9143' 8793' CGL-Zone 3 9180' 8822' Base of CGL-Zone 2C 9270' 8889' 24N 9393' 8961' 24P 9418' 8972' 22N 9510' 9003' 24P(Invert) 10062' 9000' 24N 10314' 8974' Base of CGL-Zone 2C 10386' 8963' CGL-Zone 3 10841' 8895' 42P 11370' 8831' 42N 11523' 8811' Sadlerochit-Zone 4 11758' 8787' HRZ 12925' 8687' Formation at Total Depth: HRZ(From Base) 12925' • 8687' 31.List of Attachment: Summary of Daily Drilling Reports, FIT Summary,Well Schematic Diagram,Surveys,Cement Report 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Joshua Tempel,564-4578 Email: Joshua.Tempel@bp.com Printed Name: Joe Lastufk Title: Drilling Technologist c� Signature: �1 Phone: 564-4091 Date: 'f �L11(4I/1 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only TREE=_T-EAD 4-1/16"CIW WELT = FMC • 09-03A SAMINOTES:WELL ANGLE>70.@ 945r""MAX DOGLW15.2" T. 9272'— ACTUATOR. BAKER C OKB"ELEV= 54' __ _ _ 20'CONDUCTOR — 101' q . ri I BF.ELEV= ? 2030' —14-1/2"OTIS X MP,I)=3.813' KOP= 4909' ID I I =19.124' 1, Max Angle= 101'@ 10474' • Datum MD= 9222' 9-5/8"C.ASNG STUB H 2284' —9-5/T HES ES CEMENTER 1 (RIG MLLE)6'OFF d IF l \: 2245' --103AENT IN OA(02/17/15) TOP 02/15/15) Fig 2267' —9-5/8"ECP,ID=8.580' 9-5/8'CSG,47#,L-80 HY 0 563, ID=8.681" —1 2289' r, - 2419'& 2665 —19-5/8'FO(2 EACH) 9-5/8'BOWEN CSG PATCH,ID=9..860- --1228W -2293' 13-3/8'CSG,72#,M4-80 BUTT,D=12.347" —1 2706' GAS LFT MANDRELS —. ST MD TVD DEV lY FE VLV LATCH PORT DATE 11BKR PBR ID=7.38" —1 50134' 7 3429 3429 0 WAG 0CR1 RKP - 03/20/15 9-5/8"X 7"BKR I-RD-E ZXPN LTP,D=6.18' — 5095' 6 4909 4907 10 KBG2 DAY BK 0 03/20/15 [ 1D 5 5849 5803 23 KBG2 DMY BK 0 03/20/15 9-5/8"X 7-BKR FLEX LOCK HGR,ID=6.17' — 5100' 4 6664 6549 23 KBG2 DMY BK 0 0300/15 9-5/8'WFIPSTOCK(02/20/15) —1 5236' w 3 7272 7106 23 KBG2 DMY BK 0 03/20/15 i vi, 2 7631 7435 24 KBG2 DMY BK 0 03/20/15 9-5/8 CSG,47#,S0095 J&L,ET=8.681" —1 -5236 ':,, 1 8195 7955 23 KBG2 DAY BK 0 03/20/15 Minimum ID = 3.725" @ 8840' 4-1/2" HES XN NIPPLE - MLLOUT WNDOW(09-03A) 5236'-5250' ESTIMATED TOP OF CEMENT — 7387' r. I r 1------- 0605' J_41I2'OTIS X NP,I)=3.813" N !le*: 8721' 1-1r X 4-1/2"HES TM'PKR,ID=3.85W k I I 8763' —4-1/2'OTIS X MP,ID=1813" N r 8840' —4-1/2"OTIS XN NW,D=3,725" N I V TOPOF 4-1/2"1.142 — 8852' k !IA 8852' j--17'X 5'BKR ZXP LTP w/11'PBR,ID=4.330' 4-1/2"-MG, 12.6#,13CR-85 VA M TOP, 8856' ,0152 bpf,ID=3.958' p.,40 CV 8858' —4-1/2'VVLE-G,D=3,850" i r LNR,26#,L-80 VAM TOP FTC,.0383 bpi, — 9015' OVA f a, %..., ELM)TT NOT LOGGED 13=6.276'(BTM 2 JOINTS L-80 BTC-81) •dr% •• se 0875* —7"X 5"DG FLEXLOCK HGR,D=4.32" s 4 .. PERFORATION SU/WI A RY i'ph. ,4 8885' —15-1/2"X 4-1/2'XO,D=3.880" REF LOG:SLB GR ON 03/15/15 40" ANGLE AT TOP R3T:34'@ 9021' Note:Refer to Roducbon DB for historical perf data 10341' —14-1/2"RA RP JOINT SIZE SW NTERVAL , OprilSgz SHOT SQZ 2.88' 6 9021-9031 0 03/19/15 2.88" 6 9143-9153 0 03/19/15 2.88' 6 11428- 11443 0 03/19/15 2.88' 6 11558- 11582 0 03/19/15 2.88' 6 11609- 11633 0 03/19/15 1162T —4-1/2-RA PUP JONT 2.88' 6 11800- 11815 0 03/19/15 2.88" 6 12160- 12205 0 03/19/15 2,88" 6 12432- 12455 0 03/19/15 2.88" 6 12737-12770 0 03/19/15 I a. 12870' H PBTD "(Iry 4-1/2"LNR, 12.6#,13CR-80 VAM TOP, --I 12956' seske . e e 4.dre -• .0152 bpf,ID=3,958" DATE REV BY COMNINTS DATE REV BY COMMENTS PRUCHCE BAY UNIT 04/18/76, RWN 34 INTIAL COMPLETION 03/26/15 PJC RIM/DAT CORRECTION WELL: 09-03A 12/04/90 WES F5110 04/01/15 JT/PJC FNAL OCEAFPROVAL PERAK No:u141780 03/29/97 016 R#4O 04/08/15 JT/PJC REF F LOG IT1-OR4AT1ON ADDED ' AR No: 50-029-20209-01 03/22/15 D-14 SIDETRACK(09-03A) SEC 2,TION,R15E,287 FSL&722 Fla. 03/23/15 PJC DRLG DRAFT PREP FOR RIG 03/23/15 01.1 PJC TREE C/O BP Exploration(Alaska) • ' BP AMERICA .%�i ;, ''''' OT 1 FIT Summary Well Name: 09-03A Surface Leak Or', % est f Test Test Depth Test Depth AMW Pressure Pressure �% ,BMW Date Type (TMD-Ft) (TVD-Ft) (ppg) (psi) (BHP) (psi) (ppg) 03/07/15 FIT 9,015.00 8,679.22 8.50 910.00 4,742.39 10.52 Page 1 of 1 • 41 North America-ALASKA-BP Page 1 of 70 ":, Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: ,X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/5/2015 18:00 - 19:00 1.00 MOB P PRE SKID RIG FLOOR. -PJSM AND REVIEW SOP AND CHECKLIST OF REQUIREMENTS TO SKID RIG FLOOR INTO MOVING POSITION. -CONFIRM ALL REQUIREMENTS MET TO SKID RIG FLOOR. -PJSM AND SKID RIG FLOOR INTO MOVING POSITION. 19:00 - 22.00 3.00 MOB P PRE PULL RIG OFF OF WELL. -PJSM AND REVIEW DDI SOP FOR PULLING OFF OF WELL Y-32A. -ASSIGN ROLES AND RESPONSIBILITIES FOR MOVING OFF OF WELL. -CONTACT DSO FOR WITNESS OF PULLING OFF.WAIVED WITNESS. -WSL CONFIRMED THAT ALL VALVES ON WELL ARE SHUT. -CONFIRM RADIO COMMUNICATION AND EMERGENCY SHUT DOWN OF MOVING SYSTEM FUNCTIONS PROPERLY WITH REMOTE THAT RIG MANAGER IS IN CONTROL OF IN THE CELLAR AREA.CONFIRMED GOOD. -PULL RIG OFF OF WELL WITH WSLAND RIG MANAGER WITNESS AND MOVE TO SIDE OF LOCATION AND SET DOWN. -BRING CREW INSIDE TO WARM UP. 22:00 - 00:00 2.00 MOB P PRE REPAIR UPPER HINGE PIN BRACKET ON DS REAR JACKING SYSTEM. -PJSM AND OBTAIN PROPER PERMITS FOR WELDING IN REAR WHEEL WELL AND ACCUPOINT SOLDERING. -GATHER AND PLACE AIR HEATERS IN REAR WHEEL WELL FOR WELDING JOB. -INSTALL HINGE BRACKET. *ACCUPOINT COMPLETED THEIR FINAL CONNECTIONS AND LEFT LOCATION AT 2300 HOURS. 2/6/2015 00:00 - 01:30 1.50 MOB P PRE COMPLETE REPAIR OF UPPER HINGE PIN BRACKET ON DS REAR JACKING SYSTEM. -FINISH REPAIRING BRACKET AND FIREWATCH FOR AN ADDITIONAL 30 MINUTES. -STORE HEATER TRUNKS AND ALL EQUIPMENT USED FOR TASKAND POLICE ENTIRE AREA. -CLOSE OUT PERMITS. 01:30 - 03:00 1.50 MOB P PRE INSTALL REAR BOOSTERS. -PJSM,REVIEW DDI SOP AND ASSIGN ROLES AND RESPONSIBILITIES. -PERFORM RADIO CHECKS AND CONFIRM WITH RESPONSES. -INSTALL REAR BOOSTERS IN CELLAR AND ATTACH TO RIG. 03:00 - 04:00 1.00 MOB P PRE WARM UP HYDRAULICS FOR MOVING SYSTEM. -PJSM,START MOVING SYSTEM HYDRAULICS TO GET TEMPERATURE OF OIL UP THROUGH SYSTEM. Printed 3/24/2015 2:36:10PM 4111 • North America-ALASKA-BP Page 2 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:00 - 15:00 11.00 MOB P PRE MOVE RIG F/Y-PAD TO DS 09. -PJSM WITH WSL,RIG MANAGER AND SECURITY,REVIEW DDI SOP AND ASSIGN ROLES AND RESPONSIBILITIES ALONG WITH EMPHASIS ON ROTATING OUTSIDE PERSONNEL. -CONFIRM RADIO OPERATIONAL WITH 'RESPONSES FROM DELEGATED CREW MEMBERS. MOVE RIG OFF Y-PAD DOWN Y-PAD ACCESS ROAD,ACROSS H-PAD,PAST GC2 AND TURN RIGHT ONTO SPINE ROAD. 15:00 - 00:00 9.00 MOB P PRE MOVE RIG FN-PAD TO DS 09. -CONTINUE MOVING RIG EAST ON SPINE ROAD PAST J-PAD TO GCI. -MAKE LEFT HAND TURN ON K PAD ACCESS ROAD. -AT 18:00 STOP RIG FOR 1 HR AT WIDE SPOT IN ROAD AT BACK OF GC1 TO ALLOW TRAFFIC TO PASS AND FOR SECURITY TO CHANGE OUT.. -RESUME MOVE 19:00 AND CONTINUE MOVING TOWARDS WEST DOCK ROAD. -AT 00:00 RIG IS ABOUT 1/4 MILE PAST K-PAD. 2/7/2015 00:00 - 02:00 2.00 MOB P PRE MOVE RIG F/Y-PAD TO DS 09. -CONTINUE MOVING RIG EAST ON K-PAD ROAD TO WEST DOCK ROAD. 02:00 - 06:00 4.00 MOB P PRE MOVE RIG FN-PAD TO DS 09. -TURN SOUTH ONTO WEST DOCK ROAD AND TRAVEL TO NGI. *ACCUPOINT PLANS ON OPERATING THE GPS MOVING SYSTEM AFTER THE RIG PASSES OXBOW INTERSECTION AND WILL GO TRACK LIVE WITH EQUIPMENT INSTALLED ON RIG TO FS1. 06:00 - 18:00 12.00 MOB P PRE MOVE RIG FN-PAD TO DS 09. -MOVE RIG PAST NGI,AGI AND OXBOW INTERSECTION. -MOVE RIG PAST EAST CHECKPOINT, THROUGH DEADHORSE. *24 HR NOTICE OF INITIAL BOP TEST GIVEN TO AOGCC AT 17:00. 18:00 - 20:30 2.50 MOB P PRE MOVE RIG FN-PAD TO DS 09. -TURN OFF SPINE RD IN DEADHORSE,PAST CH2 AND TO ICE ROAD ENTRANCE. -STOP HERE AND ALLOW SECURITY TO CHANGE OUT. -TOOLPUSHER DRIVES AHEAD TO INSPECT ICE ROAD. -MOVE RIG ACROSS ICE ROAD AND ONTO DS17. *ONWELL 09-03NFRM A/ AA CO I I O AND WELLHEAD PRESSURE=0,CLOSE ALL TREE VALVES. 20:30 - 00:00 3.50 MOB P PRE MOVE RIG FN-PAD TO DS 09. -RIG ARRIVES AT DS 17. STOP HERE FOR A SHORT TIME AND ALLOW CREW TO WARM UP. -CONTINUE MOVE,ARRIVE DS 09 AROUND 00:00 Printed 3/24/2015 2:36:10PM INorth America-ALASKA-BP Page 3 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/8/2015 00:00 - 02:00 2.00 MOB P PRE ARRIVE DS 09,REMOVE REAR BOOSTERS. -PJSM FOR TAKING OFF REAR BOOSTER WHEELS. -REMOVE REAR BOOSTERS. 02:00 - 04:00 2.00 MOB P PRE PULL OVER WELL. PJSM FOR MOVING OVER WELL. DISCUSS ,ROLES AND SPOTTER POSITIONS. -SPOT A FEW MORE RIG MATS TO EASE TRANSITION ONTO MATTING BOARDS. TEST E-STOP BEFORE PULLING OVER WELL. DSO NOTIFIED PRIOR TO PULLING OVER WELL. -MOVING OVER WELL WITNESSED BY WSL, TOURPUSHER. SHIM AND LEVEL RIG. 04:00 - 06:00 2.00 RIGU P PRE SKID RIG FLOOR. -PJSM FOR SKIDDING FLOOR TO DRILLING POSITION. -SKID FLOOR. 06:00 - 12:00 6.00 RIGU P PRE RIG UP ALL EQUIPMENT FOR OPERSTIONS. -PJSM AND REVIEW DDI SOP FOR CONNECTING STEAM,WATER,AIR,CHOKE 1 LINES,HIGH PRESSURE LINES AND MUD GAS SEPERATOR LINES. SPOT AND CONNECT SUPPORT BUILDINGS FOR MWD,MUD ENGINEER AND GEOLIGIST. SPOT AND CONNECT LOW SULPHER FUEL TRAILER,BARREL WARM UP SHACK AND MEETING ROOM. -RUN AND CONNECT GAI-TRONICS CABLE TO WSL OFFICE. -PJSM AND REVIEW DDI SOP FOR EXTENDING CONVEYORS AND SPOTTING ROCKWASHER. `RIG ACCEPTED AT 12:00 HOURS ON 02/08/2015 12:00 - 15:00 3.00 RIGU P DECOMP CREW CHANGE WITH CREW COMING ON AND CONFIRM ALL AREAS ARE AS THEY SHOULD BE. -PJSM AND REVIEW DDI SOP ON CHANGING OUT SAVER SUB ON TOP DRIVE. -INSTALL NEW XT 39 SAVER SUB ON TOP DRIVE AND INSPECT GRABBER DIES. -CHECK PITS AND C-PUMPS. 15:00 - 18:30 3.50 RIGU P DECOMP RIG UP CHOKE SKID MANIFOLD. -PJSM AND REVIEW DDI SOP FOR RIGGING UP CHOKE SKID. -RIG UP SO TWC CAN BE TESTED AND PRESSURE BLED OFF TO FLOWBACK TANK. *SIMOPS,TAKE SEAWATER INTO PITS FOR WELL CIRC OUT. 18:30 - 19:00 0.50 RIGU P DECOMP RIG EVAC DRILL. -HIGH LEVEL H2S EVACUATION EXERCISE. DSO WAS NOTIFIED OF DRILL. ALL PERSONS MUSTERED AND ACCOUNTED FOR. -AAR WAS HELD,SEE SAFETY SECTION FOR DETAILS. Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP • Page 4 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: 'X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 19:30 0.50 EVAL P DECOMP HOLD PRE-SPUD MEETING WITH ANDY'S CREW. ,-REVIEWED OPERATIONAL SUMMARY FROM PRE-SPUD SLIDES. -REVIEWED H2S HAZARD,OTHER HAZARDS SPECIFIC TO THIS WELL. 19:30 - 21:30 2.00 WHSUR P DECOMP PRESSURE TEST CHOKE LINES AND LINE OUT TO FLOWBACK TANK. -HOLD PJSM AND REVIEW SOP FOR PT LINES. -PRESSURE TEST LINES WITH DIESEL TO 250/3500 PSI,GOOD. -FOLLOW PT PASS/FAIL CRITERIA FOR TEMPORARY HARDLINES. 21:30 - 22:00 0.50 WHSUR P DECOMP BLEED CONTROL LINES DOWN. ONE HAD NO PRESSURE,THE OTHER HAD PRESSURE, ORDER BLEED TANK OUT. 22:00 - 23:30 1.50 WHSUR P DECOMP TEST TWC FROM ABOVE. -TWC TESTED TO 250/3500 PSI FROM ABOVE. -BOTH TESTS CHARTED,WITNESSED BY WSL. USE PASS/FAIL CRITERIA FOR TEST#1 IN WELL PROGRAM. *SIMOPS,BRING TUBING HANGER PULLER TO FLOOR,BRING BLANKING PLUG INTO CELLAR. 23:30 - 00:00 0.50 WHSUR P DECOMP LINE UP MUD PUMP#1 TO TEST TWC FROM BELOW. 2/9/2015 00:00 - 00:30 0.50 WHSUR P DECOMP CREW CHANGE AND RIG CHECKS. -LUBRICATE RIG,PERFORM RIG CHECKS. -PJSM WITH NEW CREW FOR PRESSURE TESTING TWC. 00:30 - 02:00 1.50 WHSUR P DECOMP PRESSURE TEST TWC FROM BELOW TO 250/ 2500 PSI,GOOD. TEST CHARTED AND WITNESSED BY WSL. USE PASS/FAIL CRITERIA FROM TEST#2 IN WELL PLAN. -VISUALLY CONFIRM NO LEAKS PAST TWC BY RUNNING FLUID FROM TREE INTO BUCKET. -OA PRESSURES UP FROM 50 PSI TO 110 PSI DURING TEST. 02:00 - 02:30 0.50 WHSUR P DECOMP BLEED OFF CONTROL LINE PRESSURE AND ADAPTER VOID ON TREE TO 0 PSI. 02:30 - 03:30 1.00 WHSUR P DECOMP j PUT AWAY TEST HOSES. -PURGE LINE OUT TO FLOWBACK TANK WITH AIR,THEN FLUID PACK WITH DIESEL. 03:30 - 06:00 2.50 WHSUR P DECOMP REMOVE TREE AND ADAPTER FLANGE. -CONDUCT PJSM FOR REMOVING TREE. -FMC REP VERIFIES CONTROL LINES AND ADAPTER VOID HAS NO PRESSURE. -FMC REP TERMINATES CONTROL LINES AFTER BLED OFF. Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP • Page 5 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) ' Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual Q53.70usft(above Mean Sea Level) Date From-To Hrs Task Code • NPT NPT Depth Phase I Description of Operations (hr) (usft) 06:00 - 07:30 1.50 WHSUR P DECOMP REMOVE PRODUCTION TREE AND CHECK HANGER THREADS. -THREADS IN GOOD CONDITION ON ,HANGER. -CHECK ACME THREADS WITH CROSSOVER FOR PULLING HANGER,FULLY ENGAGED WITH 7-1/2 LEFT HAND TURNS. INSTALL BLANKING PLUG AS PER WELLHEAD REP TO ACME THREADS ON HANGER TO ACCOMMODATE THREADED TEST JOINTS OPPOSED TO DOUGHNUT TEST JOINTS. -CHECK X-OVER TO BLANKING PLUG TO ACCOMMODATE TEST JOINTS,FULLY ENGAGED WITH 8-1/2 RIGHT HAND TURNS. 07:30 - 11:00 3.50 WHSUR P DECOMP INSTALL BOPE. -BOLTS TORQUED TO SPEC. -INSTALL DUTCH RISER FLANGE ON TOP OF I BOPE. 11:00 - 12:00 1.00 WHSUR P DECOMP RIG EVAC AND H2S EXERCISE. -AAR CONDUCTED. -APP PERSONS MUSTER AND ACCOUNTED FOR. -PRE-SPUD MEETING WITH"C"CREW AFTERWARDS. 12:00 - 14:30 2.50 BOPSUR P DECOMP FINISH PREP WORK FOR BOPE TEST. -INSTALL FLOW LINE AND FLOW LINE COVERS. -INSTALL LARGE AND SMALL MOUSE HOLES. -MAKE UP X-OVERS ON SAFETY VALVES AND TEST JOINT. -FILL BOPE STACK WITH WATER AND CHECK FOR LEAKS. -FIND PINHOLE LEAK ON DUTCH RISER FLANGE AT WELDED CONNECTION ABOVE THE FLANGE. 14:30 - 15:30 1.00 BOPSUR N SFAL DECOMP REMOVE FLOW LINE,RISER AND DUTCH RISER FLANGE. -DRAIN STACK BELOW THE DUTCH SYSTEM THAT IS ATTACHED TO THE TOP OF THE ANNULAR PREVENTER. -REMOVE FLANGE BOLTS FROM THE DUTCH RISER FLANGE WITH HYDRA TIGHT WRENCH. -PULL MASTER BUSHINGS. -PULL FLANGE AND RISER TO FLOOR AND LOWER DOWN BEAVER SLIDE. -SEND FLANGE WITH FLOW NIPPLE RISER TO DOYON YARD TO REPAIR LEAK ON WELD 1 ABOVE FLANGE. 'RISER WAS REMOVED FROM OLD DUTCH FLANGE AND INSTALLED ON NEW DUTCH • FLANGE DUE TO THE LOCK DOWN PINS DID NOT SEAL AS DESIGNED.DURING LONG MOVE TO DS 09 AFTER NEW DUTCH FLANGE WAS INSTALLED AND BOPE STACK FILLED WITH WATER A LEAK WAS OBSERVED AT THE WELD WHERE THE FLOW RISER WAS • ATTACHED TO THE TOP OF THE NEW DUTCH FLANGE. Printed 3/24/2015 2:36:10PM North America-ALASKA-BP • Page 6 of 70 Operation Summary Report ..... / . it �%. Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161 V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020800 Active datum:09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:30 - 17:30 2.00 BOPSUR P DECOMP PREP FOR BOPE TEST. -INSTALL 4"TEST JOINT IN STACK. -IA PSI.UP TO 50 PSI.CONNECT TO BLEED TANK. -BLEED OFF 8-10 GAL DIESEL FROM IA TO BLEED TANK,FLOW STOPS. -GOOD SHELL TEST OF BOPE. 17:30 - 22:30 5.00 BOPSUR P DECOMP "TEST BOPE 250/3500 PSI. -PJSM AND REVIEW DDI SOP AND DISCUSS PRESSURE CROSSCHECK LIST WITH APPROPRIATE RESPONSES. -TEST ANNULAR AND BOTTOM RAMS WITH 4" TEST JOINT. -TEST BOTTOM RAMS WITH 5-1/2"TEST JOINT. -TEST TOP RAMS WITH 7'TEST JOINT. -TEST TOP DRIVE HYDRAULIC IBOP,MANUAL IBOP,2 XT39 FOSV,1 XT39 DART VALVE,1 4-1/2"IF FOSVAND ALL CHOKE VALVES. -TESTS WITNESSED BY JEFF JONES WITH AOGCC,WSL AND TOURPUSHER. USE PASS/FAIL CRITERIA TEST#3 IN WELL PLAN. 22:30 - 23:30 1.00 BOPSUR P DECOMP I-RIG DOWN ALL TEST EQUIPMENT AND X-OVERS USED TO TEST FOSVS. 23:30 - 00:00 0.50 BOPSUR N SFAL DECOMP INSTALL DUTCH RISER FLANGE BACK ON BOPE STACK -PULL MASTER BUSHINGS ON ROTARY TABLE. -BRING UP REPAIRED DUTCH RISER FLANGE AND FLOW NIPPLE TO FLOOR AND LOWER THROUGH ROTARY TABLE ON TOP OF ANNULAR PREVENTER. 2/10/2015 00:00 - 00:30 0.50 BOPSUR P DECOMP SERVICE RIG. -SERVICE TOP DRIVE,DRAWORKS AND ST-80. -CREW CHANGE AND RIG CHECKS. 00:30 01:30 1.00 BOPSUR N DECOMP INSTALL DUTCH RISER FLANGE. -TORQUE NEW DUTCH RISER FLANGE TO TOP OF ANNULAR PREVENTER WITH HYDRA TIGHT WRENCH. -MAKE UP FLOWLINE TO RISER ASSEMBLY. -FILL WITH WATER FOR HYDROSTATIC TEST, NO LEAKS. 01:30 - 02:00 0.50 WHSUR P DECOMP PULL BLANKING PLUG. -PULL BLANKING PLUG AS PER FMC REP. 02:00 - 04:00 2.00 WHSUR P DECOMP INSTALL DUTCH RISER LUBRICATOR AND DSM LUBRICATOR WITH QTS. -TEST DSM LUBRICATOR 250/3500 PSI, GOOD. -USE PASS/FAIL CRITERIA FOR TEMPORARY PIPEWORK AND LUBRICATORS. 04:00 - 05:00 1.00 WHSUR P DECOMP PULLTWC WITH LUBRICATOR. -PULL 6""J"STYLE TWC. -R/D DSM LUBRICATOR AND REMOVE FROM FLOOR. Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP Page 7 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. I UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:00 - 08:30 3.50 PULL P DECOMP RU FOR DISPLACEMENT OF DIESEL FROM WELLBORE. -PJSM ON CIRCULATING TO FLOWBACK TANK AND DISCUSS HAZARDS OF H2S. -ENSURE ALL PERSONNEL STAY OFF THE TOP OF THE FLOWBACK TANK DURING OPERATION. DISCUSS FLUIDS MANAGEMENT AND MAKING SURE BBL IN AND BBL OUT ARE BEING TRACKED. -CONNECT PUMP LINES TO CHOKE HOUSE AND PRESSURE TEST LINES.250 PSI LOW/ 3500 PSI HIGH FOR 5 MIN EA -BLOW DOWN LINES TO FLOW BACK TANK. 08:30 - 11:00 2.50 PULL P DECOMP CIRCULATE OUT DIESEL FREEZE PROTECT WITH 8.5 PPG SEAWATER -10 BPM WITH 830 PSI-TOTAL 400 BBLS PUMPED -WITH THE BLINDS CLOSED CIRCULATE DOWN THE KILL LINE TAKING RETURNS UP THE IA TO THE FLOW BACK TANK -CIRCULATION THROUGH CUT POINT AT 5,308' EVACUATE DIESEL FROM WELLBORE AND PUMP A FULL COLUMN OF 8.5 PPG SEAWATER KWF. OA REMAINS AT 50 PSI.BEFORE PUMPING AND WILL BE MONITORED ENTIRE DISPLACEMENT. -10 MIN FLOW CHECK-WELL STATIC -VERIFY NO PRESSURE BELOW THE BLINDS, OPEN BLINDS AND BLOW DOWN LINE TO THE FLOW BACK TANK AND FLUSH WITH DIESEL 11:00 - 13:30 2.50 PULL P DECOMP MAKE UP TUBING HANGER XO TO JOINT OF '4"DP -RIH AND MAKE UP TO HANGER-VERIFY 7-1/2 TURNS FROM PREVIOUS MAKE UP -CREW CHANGE OUT,CONTINUE RIG UP TO PULL HANGER RIG UP TO PULL COMPLETION, -PJSM WITH SLB,FMC AND D-14 HANDS ON RIGGING UP EQUIPMENT. -MOBILIZE SPOOL,TOOLS AND EQUIPMENT TO RIG FLOOR. -FMC REP VERIFY CORRECT LENGTHS FOR BACKING OUT LOCK DOWN SCREWS -BOLDS Printed 3/24/2015 2:36:10PM North America-ALASKA-BP Page 8 of 70 Operation Summary Report ": Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date. X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) 13:30 - 17:00 3.50 PULL P DECOMP PULL HANGER TO RIG FLOOR. -PJSM.DISCUSS MAX PULLAND LIFTING OPERATIONS -PULL HANGER AT 116 K ON WEIGHT INDICATOR WITH NO PROBLEMS. -PU 2'AND CIRCULATE BOTTOMW UP WITH 8.5 PPG SEAWATER -.10 BPM,966 PSI, -10 MIN FLOW CHECK-WELL STATIC MW-8.5 PPG IN/OUT -PULL 7"HANGER THROUGH BOP STACK TO RIG FLOOR. -TERMINATE CONTROL LINES BELOW HANGER. -SET TUBING IN SLIPS. -BREAK OUT HANGER FROM TUBING AND LAY DOWN LANDING JOINT. -LAY DOWN HANGER TO PIPE SHED. 17:00 - 23:30 6.50 PULL P DECOMP PULL AND LAYDOWN 7"AND 5.5" COMPLETION FROM THE JET CUT AT 5,308' IMD PUW-150K, POOH W/7"26#NSCC FROM 5,308'MD TO -2,880'MD WITH CONTROL LINES TERMINTATE CONTROL LINES AND LAYDOWN SPOOLER. -CHANGE OUT ELEVATORS TO 5",CHANGE SAFETY JOINT AND XO FOR FOSV-MAKE UP AND VERIFY CORRECT MAKE UP. -POOH W/5.5"17#NSCC FROM 2,885'MD TO THE CUT JOINT -MONITOR HOLE FILL ON TRIP TANK- CORRECT HOLE FILL OBSERVED *MONITOR OA FOR PRESSURE BUILDUP:23:0 READING=0 PSI. *72 FULL JOINTS OF 7"PULLED,33.02'OF 7" PUP JOINTS BELOW HANGER,1-SVLN VALVE *57 FULL JOINTS OF 5.5"17#,(2)5.5"-GLM'S WITH 4-5.5"PUPS, 1 CUT JOINT=3.26'.6.25" OD FLARE *38 OF 55 STEEL BANDS RECOVERED 23:30 - 00:00 0.50 PULL P DECOMP CLEAN AND CLEAR RIG FLOOR -PJSM FOR LAYING DOWN TOOLS AND BEAVER SLIDE OPERATIONS. 2/11/2015 00:00 - 00:30 0.50 PULL P DECOMP RIG SERVICE _ -LUBRICATE RIG 00:30 - 01:30 1.00 PULL P DECOMP CONTINUE REMOVING TOOLS&EQUIPMENT FROM RIG FLOOR 01:30 - 05:00 3.50 EVAL P DECOMP RIG UP HES ELINE UNIT TO LOG FOR WHIPSTOCK PLACEMENT AND TOP OF CEMENT FOR 9-5/8"CASING CUT. -PJSM FOR RIGGING UP ELINE UNIT AND PICKING UP TOOLS.REVIEW LIFTING OPERATIONS,EXCLUSION ZONES,AND REVIEW DDI PROCEDURE FOR RIGGING UP E-LINE. -INSTALL WEAR RING -1.05',ID-8-7/8" Printed 3/24/2015 2:36.10PM North America-ALASKA-BP • Page 9 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:00 - 11:00 6.00 EVAL P DECOMP RUN 8.17"GAUGE RING DRIFT WITH E LINE. -MOBILISE ELINE TOOLS TO RIG FLOOR. -MAKE UP TOOL STRING WITH 8.17 GAUGE DRIFT,JUNK BASKET,GAMMAAND CCL. -RIH ENCOUNTERING WEIGHT BOBBLES AT SEVERAL POINTS DOWN TO TOP OF 5.5" STUB AT 5315'WLM. -POOH LOGGING GAMMA AND CCL. -7 STAINLESS STEEL BANDS RECOVERED IN JUNK BASKET. -CONSULT TOWN AND RUN SAME CONFIGURATION TO 2700'TO ENSURE CLEAR WELL BORE FOR RUNNING CAST-M TOOL. -RUN 2 ENCOUNTERED WEIGHT BOBBLES AND RETRIEVED 2 STAINLESS STEEL BANDS IN JUNK BASKET. -RUN 3 ENCOUNTERED 1 WEIGHT BOBBLE AT 2419'(CORRESPONDS WITH 9 5/8"FO)AND RETRIEVED 0 STAINLESS STEEL BANDS IN JUNK BASKET. TOTAL 41 OF 58 BANDS ACCOUNTED FOR 11:00 - 15:00 4.00 EVAL P DECOMP MAKE UP CAST M TOOL TO LOG TOP OF CEMENT FOR CASING CUT. -PJSM FOR MAKING UP TOOL STRING. -MAKE UP CAST-M TOOL STRING. -RIH TO 2,700' -POOH LOGGING AT 60'PER MINUTE 15:00 - 16:00 1.00 EVAL N DFAL ' 5,308.00 DECOMP GATHER LOG DATA FOR INTERPRETATION CREATE FILES 16:00 - 17:00 1.00 EVAL N DFAL 5,308.00 DECOMP GATHER LOG DATA FOR INTERPRETATION -EXTRA TIME SPENT INTERPRETING CAST-M LOG DATA DUE TO INABILITY TO STREAM DATA IN REAL TIME TOC DETERMINED TO BE AT 2400'MD 17:00 - 18:00 1.00 EVAL P DECOMP RIG DOWN WIRELINE -PJSM FOR RIG DOWN OPERATIONS -DISCUSS TOOL HADLING PRIOR TO LAYING DOWN TOOLS -PULL WEAR RING AND INSTALL TEST PLUG 18:00 - 20:30 2.50 BOPSUR P DECOMP CHANGE UPPER RAMS FROM 7"TO 9-5/8" SOLID BODIES FOR 9-5/8"CASING PULL -PJSM FOR CHANGING RAMS:REVIEW DDI PROCEDURE FOR TASK,DISCUSS ENERGY ISOLATION,HAND SAFETY&WORKING AT HEIGHTS. -SHUT THE BLIND SHEARS-SWAP 7"SOLID RAMS TO 9-5/8"SOLID RAMS -BARRIERS FOR CHANGING OUT RAMS- CLOSED BLIND SHEARS,KILL WEIGHT FLUID, CEMENT PLUG -OPEN CHOKE AND KILL LINE TO A CLOSED CHOKE MANIFOLD TO VERIFY NO PRESSURE BELOW THE BLINDS -OPEN BLINDS AND BLOW DOWN CHOKE AND KILL LINES Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP 110' Page'10 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time.3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 22:30 2.00 BOPSUR P DECOMP PRESSURE TEST 9-5/8"SOLID BODY RAMS -RIG UP TEST EQUIPMENT -PJSM FOR PRESSURE TESTING 9-5/8"RAMS -MAKE ANNOUNCEMENT FOR HIGH PRESSURE TESTING,ENSURE PROPER LINE UP FOR PRESSURE FLOW RIG UP AND PRESSURE TEST 9-5/8"SOLID BODY RAMS TO 250 LOW/3500 PSI HIGH FOR 5 CHARTED MINUTES,PASSING TEST -PULL TEST PLUG AND INSTALL WEAR RING- 8-7/8"ID 22.30 - 00:00 1.50 CUT P DECOMP 1 PU 8-1/4"MULTISTRING CUTTER ASSEMBLY TO CUT 9-5/8"CASING -PJSM FOR PU MULTISTRING CUTTER ASSEMBLY -MOBILIZE CUTTER,XO,AND 8-1/2"SMOOTH MILL TO RIG FLOOR -RIH W/MULTISTRING CUTTER ASSEMBLY 'SINGLING IN ON 4"DP 2/12/2015 00:00 - 03:00 3.00 CUT P DECOMP RIH W/8-1/4"MULTI-STRING CUTTER ASSEMBLY TO CUT 9-5/8"CASING RIH ON 4"DP SINGLING IN TO 2,400' 03:00 - 04:30 1.50 CUT P DECOMP LOCATE 9-5/8"COLLARS TO IDENTIFY PROPER CUT DEPTH -PJSM WITH RIG CREW AND BAKER REP FOR CASING CUT AND ARCTIC PACK CIRC OUT ESTABLISH PARAMETERS AND OBTAIN SPRs. 'PUW=85K, SOW=90K -LOCATE LOWER COLLAR WITH KNIVES AT 2,324'-PUMPS ON AT 4 BPM,210 PSI -RACK BACK ONE STAND -LOCATE UPPER COLLAR WITH KNIVES AT 2,282'-PUMPS ON AT 4 BPM,210 PSI -SET KNIVES AT 2,290'FOR CUT SPR'S AT 2,306'MD-MW 8.5 PPG -1)30 SPM/80 PSI,40 SPM/140 PSI 2)30 SPM/80 PSI,40 SPM/140 PSI 04:30 - 05:00 0.50 CUT P DECOMP CUT 9-5/8"47#BTC CASING AT 2,290'. -STARTED PUMPS AT 3.8 BPM WITH 200 PSI, RPM=80 WITH 1-2K TORQUE,7 BPM WITH 850 PSI -AFTER 9 MINUTES OF CUTTING,STALLED OUT -PICKED UP ABOVE CUT WITH PUMPS OFF. PUMPS ON AT 3.8 BPM,200 PSI AND SET CUTTERS BACK ON CUT AT 2,290' -CONTINUE CUTTING AT 6.6 BPM WITH 700 PSI FOR 15 MINS AT 80 RPM W/1-5K TQ,AS PER WELL PROGRAM TO ENSURE GOOD CUT. Printed 3/24/2015 2:36:10PM North America-ALASKA-BP III Page 11 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:00 - 10:00 5.00 CUT P DECOMP RIG UP TO CIRCULATE OUT ARCTIC PACK FROM BEHIND 9-5/8"CASING -PJSM FOR CIRCULATING OUT FREEZE PROTECT-REVIEW PROCEDURE,DISCUSS CORRECT LINE UP AND PUMPING SCHEDULE.SPILL PREVENTION. -RIG UP LITTLE RED TO CHOKE MANIFOLD TEST LINES TO 250 PSI LOW/4000 PSI HIGH PUMP 25 BBLS OF DIESEL DOWN THE DRILL STRING AT 1.5 BPM,200 PSI,TAKING RETURNS BACK TO THE PITS. -SHUT ANNULAR PREVENTER AND PUMPED AN ADDITIONAL 25 BBLS OF 100 DEG DIESEL. -PUMPED 25 BBLS OF 9.8 PPG BRINE DISPLACING A TOTAL OF 50 BBLS OF DIESEL INTO THE 13-3/8"BY 9-5/8"ANNULUS AT THE CUT AT 2,290'MD TAKING RETURNS OUT THE OA TO THE FLOW BACK TANK -2 BPM,WITH 1230 PSI. -ALLOW DIESEL TO SOAK IN THE 13-3/8"BY 9-5/8"ANNULUS FOR ONE HOUR. 10:00 - 13:00 3.00 CUT P DECOMP CIRCULATE OUT ARCTIC PAC FROM 13-3/8" BY 9-5/8"ANNULUS LINE UP RIG PUMPS TO CIRCULATE 9.8 PPG HEATED BRINE -PUMP 265 BBLS OF BRINE,ICP WITH 3.5 BPM-1490 PSI,FCP WITH 1.75 BPM-1600 PSI -SHUT DOWN PUMPING,BLOW DOWN CHOKE MANIFOLD AND HARD LINES -EMPTY THE FLOW BACK TANK IN PREPARATION TO PUMP DEEP CLEAN PILL. 13:00 - 14:30 1.50 CUT P DECOMP CIRCULATE OUT ARCTIC PAC FROM 13-3/8" 1 BY 9-5/8"ANNULUS LINE UP TO COMPLETE ARCTIC PAC CIRC OUT START PUMPING DEEP CLEAN PILL WITH 2 BPM,PRESSURE IMMEDIATELY CAME UP TO 1500 PSI WITH NO RETURNS -RIG CREW VERIFYING SURFACE LINES NOT FROZEN. LINED UP AND MADE SECOND ATTEMPT TO PUMP DEEP CLEAN PILL -2 BPM,PRESSURED UP TO 1750 PSI WITH NO RETURNS-TOTAL OF 2.5 BBLS PUMPED 14:30 - 16:00 1.50 CUT N DECOMP WAIT ON ORDERS FROM ENGINEERING GROUP IN ANCHORAGE -BLEED OFF OA&DP PRESSURE. SECURE SURFACE LINES,BLOW DOWN LINES AND PACK HARD LINES TO THE FLOW BACK TANK WITH DIESEL. SIM OPS:LOAD,DRIFT&TALLY 9-5/8" CASING FOR TIE BACK 16:00 - 17:30 1.50 CUT P DECOMP CIRCULATE SURFACE TO SURFACE -CIRCULATE 9.8 PPG BRINE,6 BPM,700 PSI SHUT DOWN AND LINE UP TO MONITOR WELL ON THE TRIP TANK. -9.8 PPG BRINE IN/OUT Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP • Page 12 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 ! Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) • (usft) 17:30 - 23:00 5.50 CUT P DECOMP RIH WITH 8-114"STRING MILL CUTTER ASSEMBLY ON 4"DP SINGLES. -SINGLE IN THE HOLE FROM-2,290'MD TO 5,320' -TAG 5.5"TUBING STUMP AT 5,320'SET DOWN 5K -PUW-125K,SOW-131K MONITOR TRIP ON TRIP TANK-CORRECT DISPLACEMENT OBSERVED 23:00 - 00:00 1.00 CUT P DECOMP DISPLACE WELL TO 5,320'WITH 9.8 PPG BRINE SPOT VAC TRUCKS WITH 9.8 PPG BRINE TO SWAP WELL BORE TO 9.8 PPG BRINE -PJSM FOR DISPLACING-REVIEWED PROCEDURE DISCUSSED VOLUMES,RATES !AND PRESSURES.HIGHLIGHTED SPILL PREVENTION.ENSURE PROPER LINE UP FOR CIRCULATION PATH. 2/13/2015 00:00 - 01:00 1.00 CUT P DECOMP EMPTY TRIP TANK AND FILL WITH 9.8 PPG BRINE PRIOR TO CIRCULATION. 01:00 - 02:30 1.50 CUT P DECOMP DISPLACE WELL TO 5,320 WITH 9.8 PPG BRINE 179 GPM,420 PSI-RATE LIMITED BY VAC ,TRUCK PUSHING BRINE TO THE RIG. -TOTAL OF 290 BBLS OF 9.8 BRINE PUMPED -SPOT 35 BBLS OF 9.8 PPG HIGH VIS BRINE ON BOTTOM 1 170 GPM,450 PSI,VIS=150 SPR'S TAKEN WITH NEW 9.8 PPG MW IN THE HOLE MONITOR WELL 10 MIN-WELL STATIC -MW 9.8 PPG IN/OUT 02:30 - 06:30 4.00 CUT P DECOMP POOH WITH 8-1/4"MULTI-STRING CUTTER ASSEMBLY ON 4"DP STANDING BACK IN THE DERRICK -PUW-125K,SOW-130K,AT 5,320'MD -POOH ON ELEVATORS FROM 5,320'MD TO THE CUTTER ASSEMBLY -MONITOR WELL -LD 8-1/4"MULTI-STRING CUTTER ASSEMBLY AS DIRECTED BY THE BOT REP -ALL CUTTERS INTACT ON CUTTING ASSEMBLY -MONITOR TRIP ON TRIP TANK-CORRECT HOLE FILL OBSERVED. TABLE TOP KICK WHILE TRIPPING 06:30 - 08:00 1.50 CUT P DECOMP i PREP FLOOR FOR 9-5/8"CASING PULL -PULL WEAR RING-MAKE UP 9-5/8"BTC XO TO THE FOSV -MAKE UP 7-3/4"BOT SPEAR ASSEMBLY AS DIRECTED BY THE BOT REP -RIH&ENGAGE SPEAR TO 9-5/8"CASING& MANDREL HANGER 08:00 - 09:00 1.00 CUT P DECOMP 1 SAFETY STAND DOWN SHUT DOWN OPERATION FOR DISCUSSION WITH BP WELLS TEAM LEAD AND ROTARY FIELD SUPT -CREW INTERACTION AND FEEDBACK ON RECENT INCIDENTS ACROSS THE FIELD Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP • Page 13 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161 V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: • Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 11:00 2.00 CUT P DECOMP PULL HANGER -FMC REP TO BOLDS-VERIFIED CORRECT MEASUREMENTS PRIOR TO BACKING OUT. VERIFY PRESSURE ON THE OA PRIOR TO BOLDS. -BLEED 5 PSI OFF OF OA,WAIT 30 MIN AND CHECK FOR PRESSURE-ZERO PRESSURE BACK OUT LOCK DOWN SCREWS -PU 9-5/8"CASING TONGS PJSM PRIOR TO PICKING UP TONGS: ENSURE CREWS UNDERSTAND HAZARDS ASSOCIATED WITH THESE HEAVY TONGS 11.00 - 12:30 1.50 CUT P DECOMP PULL MANDREL HANGER&9-5/8"CASING TO THE RIG FLOOR -PULLED HANGER FREE FROM BOWL WITH 200K,70K OVER STRING WEIGHT. -CASING PULLED FREE WITH 250K,120K OVER STRING WEIGHT PULLED HANGER TO RIG FLOOR AND LAYDOWN -RE-ENGAGE 9-5/8"CASING WITH SPEAR AND PACK OFF TO CIRCULATE BREAK CIRCULATION WHILE RECIPROCATING CASING-60' 4 BPM,W/80 PSI.,9.8 PPG BRINE PUW-145K,SOW-140 _ 12:30 - 15:00 2.50 CUT P DECOMP CIRCULATE OUT ARCTIC PAC -PJSM FOR ARCTIC PAC CIRCULATION: REVIEW PRESSURE CROSS CHECK,VERIFY CORRECT LINE UP TO THE FLOW BACK TANK. -PUMP 100 BBLS OF 9.8 PPG BRINE AT 5 BPM,330 PSI -RETURN BEING TAKEN THROUGH THE OA OUT TO THE FLOWBACK TANK -PUMP 50 BBLS OF DEEP CLEAN PILL FOLLOWED BY 40 BBLS OF HIGH VIS SWEEP, CHASED PILLS WITH 390 BBLS OF 9.8 PPG BRINE AT 5 BPM,230 PSI -FLOW CHECK WELL 10 MIN-WELL STATIC. 15:00 - 16:30 1.50 CUT P DECOMP LAY DOWN 9-5/8"SPEAR ASSEMBLY -FREEZE PROTECT HARDLINES TO THE FLOW BACK TANK -RU SAFETY JOINT WITH 9-5/8"LIFT SUB - BLOW DOWN TOP DRIVE Printed 3/24/2015 2.36.10PM • North America-ALASKA-BP Page 14 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 I Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. I UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:30 - 18:30 2.00 CUT P DECOMP POOH ON ELEVATORS WITH 9-5/8"47#BTC CASING FROM 2,290'MD -PJSM FOR POOH AND USING 14"ULTRA HIGH TQ DOUBLE STACK TONGS.REVIEW DDI PROCEDURE AND DISCUSS HAZARDS ASSOCIATED WITH TONG USE,HAND PLACEMENT AND POTENTIAL FOR DROPPED OBJECTS -RU 9-5/8"SIDE DOOR ELEVATORS-DRILLER 'AND LEAD FLOOR HAND TO VERIFY CORRECT SIZE AND LIFTING CAPACITY, ALSO VERIFY CORRECT TONG HEAD SIZE -AVERAGE BREAK OUT TQ-55K FOR THE FIRST FEW JOINTS,THEN DROPPED TO AVG OF 40K LAY DOWN 10 JNTS FROM 2,290'TO 1,884' MD.HOLE NOT TAKING CORRECT HOLE FILL. -SHUT DOWN AND MONITOR WELL-NO FLOW OBSERVE,SMALL BUBBLES BREAKING OUTAND FLUID LEVEL DROPPING SLOWLY. -PERFORMED A KICK WHILE TRIPPING DRILL-PU&MU SAFETY JOINT. -MONITOR WELL-GAS STILL BREAKING OUT .AND FLUID LEVEL DROPPING SLIGHTLY. DISCUSS PLAN FORWARD WITH ROT SUPERINTENDENT AND ODE 18:30 - 22:00 3.50 CUT P DECOMP CIRCULATE OUT WELL TO THE FLOW BACK TANK -LINE UP TO CIRCULATE OUT THE 9.8 PPG BRINE WITH 8.5PPG SEA WATER -LINE UP AND TAKE RETURNS OUT TO THE FLOW BACK TANK. -ICP 230 GPM-480 PSI,FCP-265 GPM WITH 360 PSI,TOTAL OF 290 BBLS OF SEAWATER PUMPED -8.5 PPG SEAWATER IN/OUT. -MONITOR WELL 10 MIN-WELL STATIC-NO GAS BREAKING OUT -FREEZE PROTECT LINES OUT TO THE FLOW BACK TANK AND CHOKE SKID. 22:00 - 00:00 2.00 CUT P DECOMP POOH ON ELEVATORS WITH 9-5/8"CASING LAYING DOWN TO THE PIPE SHED -ENSURING CORRECT HANDLING TO PREVENT ENVIRONMENTAL IMPACT FROM DIRTY PIPE 1-POOH FROM 1,884'TO 1,396'MD -AVG BREAK OUT TQ 40K -REMOVAL OF BOW SPRING CENTRALIZERS REQUIRING AN AIR CHISEL. HAZARD ID CARD FILLED OUT FOR USE OF AIR CHISEL. -CORRECT HOLE FILL OBSERVED. Printed 3/24/2015 2:36:10PM North America-ALASKA-BP Page 15 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/14/2015 00:00 - 04:30 4.50 CUT P DECOMP POOH ON ELEVATORS WITH 9-5/8"CASING LAYING DOWN TO THE PIPE SHED -ENSURING CORRECT HANDLING TO PREVENT ENVIRONMENTAL IMPACT FROM DIRTY PIPE POOH FROM 1,396'MD TO SURFACE -AVG BREAK OUT TQ 40K -REMOVAL OF BOW SPRING CENTRALIZERS REQUIRING AN AIR CHISEL. *HAZARD ID CARD FILLED OUT FOR USE OF AIR CHISEL. -CORRECT HOLE FILL OBSERVED. -TOTAL OF 56 JTS+CUT JT LAID DOWN -CUT JT=8.72'WITH 10"FLAIR -CONDITION OF PIPE WAS GOOD,BUT COVERED IN ARCTIC PAC I-12 BOW SPRING CENTRALIZERS RECOVERED WITH 12 PIECES/BOWS MISSING FROM THEM 04:30 08:00 3.50 CUT P DECOMP RIG DOWN CASING RUNNING EQUIPMENT RIG DOWN 9-5/8"ELEVATORS,14"DOUBLE STACK TONGS,AND CASING EQUIPMENT CLEAN RIG FLOOR FROM ARCTIC PAC 08:00 - 09:30 1.50 BOPSUR P DECOMP RIG UP TO INSTALL WEAR RING WHILE DRAINING STACK TO INSTALL WEAR RING,NOTICED METAL PIECES FROM BOW SPRING CENTRALIZERS LAYING ACROSS UPPER RAM CAVITY -DISCUSSED WITH TOWN AND CALLED OUT FOR 5-1/2"MAGNET FROM BAKER SIM-OPS=CLEAN 4-5 INCHES OF ARCTIC PACK OUT OF DRIP PAN BELOW RIG FLOOR 09:30 - 12:00 2.50 BOPSUR P DECOMP MAKE UP 5-1/2"MAGNET ON 1 JT OF DRILL PIPE ATTEMPT TO FISH CENTRALIZER PIECES OUT OF STACK ONE PIECE FELL DOWN HOLE -FUNCTION BOTTOM RAMS&BLIND RAMS SLOWLY WITH AIR PUMP TO SEE IF RAM CAVITIES ARE CLEAR -ONE CENTRALIZER FRAGMENT ACROSS THE UPPER RAM CAVITY -ATTEMPT TO FISH CENTRALIZER PIECE WITH MAGNET AND IT FELL DOWN HOLE 12:00 - 13:30 1.50 BOPSUR P DECOMP INSPECT UPPER RAM CAVITY FOR METAL DEBRIS -OBTAIN APPROVAL FROM ROTARY SUPERINTENDENT TO OPEN RAM DOORS -TESTED MECHANICAL BARRIERS IN PLACE: BLIND RAMS,PASSING CMIT T X IA X OA,AND CEMENT PLUG -PJSM FOR OPENING RAM DOORS CLOSE BLIND RAMS,BLEED DOWN ACCUMULATOR&SAFE OUT -OPEN TOP RAM DOOR AND RECOVER 1 CENTRALIZER BOW SPRING IN UPPER RAM CAVITY. -CLOSE RAM DOOR Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP • Page 16 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:30 - 15:00 1.50 BOPSUR P DECOMP FLUSH STACK FUNCTION BOTTOM RAMS WITH AIR PUMP AND OBSERVED ARCTIC PAC FALLING FROM CAVITY -MU STACK WASHER ON 1 JT OF DP AND FLUSH STACK AT 463 GPM W/60 PSI,100 RPM W/1K TQ OBSERVED DEBRIS IN LOWER PIPE RAM CAVITY -MU 5-1/2"MAGNET AND RETRIEVE TWO BOW SPRING CENTRALIZER PIECES LD MAGNET ASSEMBLY 15:00 18:30 3.50 BOPSUR P DECOMP BODY TEST BOPE MU AND SET UPPER TEST PLUG W/4"TEST 'JOINT -BODY TEST BOPE TO 250PSI/3500PSI LOW /HIGH FOR 5 MINS EACH-PASS -RD TEST EQUIPMENT AND BLOW DOWN CHOKE/KILL LINES ,18:30 19:00 0.50 BOPSUR P DECOMP INSTALL WEAR RING&RILDS -12-3/8"WEAR RING ID VERIFIED BY DRILLER FMC REP ON SITE AND VERIFIED CORRECT LDS MEASUREMENTS FMC REP ALSO VERIFIED CORRECT WELLHEAD EQUIPMENT IS ON LOCATION FOR UPCOMING WELLHEAD WORK 19:00 - 22:00 3.00 CUT P DECOMP MAKE UP 12-1/8"DRESS OFF BHA TO DRESS OFF 9-5/8"CASING STUB AT 2,290'MD -PJSM FOR MU BHA.REVIEWED DDI SOP FOR MU BHA.DISCUSSED NON-SHEARABLES ACROSS STACK.EMPHASIZED HAND SAFETY AND PROPER PIPE HANDLING -MU BHA -RIH PICKING UP 4"DP SINGLES TO 235' 22:00 - 00:00 2.00 CUT N RREP t DECOMP —CODE 8 RIG DOWN TIME— RIG GENERATOR FAILURE TROUBLESHOOT GENERATOR FAILURE -MOBILIZE PORTABLE HEATERS AND BD LINES ON RIG -DISCUSS WELL CONTROL PLAN DURING POWER OUTAGE -BRING BOILERS AND WATER BACK ONLINE. PURGE STEAM HEATERS *GENERATOR WAS RUN OUT OF DIESEL DUE TO CLOSED TRANSFER VALVE ON GENERATOR FUEL SUPPLY TANK DDI TOOLPUSHER TO INVESTIGATE WHY LOW FUEL ALARM DID NOT WORK. TRACTION REPORT GENERATED FOR INCIDENT-2015-IR-4931584 2/15/2015 00:00 - 02:00 2.00 CUT P DECOMP RIG SERVICE -LUBRICATE RIG -ADJUST A-LEG TO BETTER CENTER TOP DRIVE OVER STUMP Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP S Page 17 of 70 Operation Summary Report Common Well Name 09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date 'X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:00 - 04:30 2.50 CUT P DECOMP RIH WITH 12-1/8"DRESS OFF BHA TO DRESS OFF 9-5/8"CASING STUB AT 2,290'MD -RIH F/235'TI 2,300'PICKING UP 4"DP SINGLES -PICKED UP A TOTAL OF 64 SINGLES MONITOR TRIP ON TRIP TANK-PROPER DISPLACEMENT OBSERVED 04:30 - 05:00 0.50 CUT P DECOMP TAG 9-5/8"STUB WITH DRESS OFF BHA. -PUMP DOWN LAST JOINT OF DP -OBTAIN PARAMETERS AT 230 GPM,230 PSI &PRIOR TO TAGGING STUB AT 2,290'MD 105K PUW,99K SOW,100K ROT @ 30 RPM W/1KTQ -TAGGED ON DEPTH AT 2,290'W/5K DOWN. PICK UP AND RETAG TO VERIFY DEPTH -TAKE SPR'S 05:00 06:00 1.00 CUT P DECOMP CIRCULATE WELLBORE TO CLEAN UP ARCTIC PAC -PUMP 40 BBL DEEP CLEAN PILL -CHASE WITH 130 DEG 8.5 PPG SEAWATER- 242 BBLS AT 470 GPM,470 PSI -AFTER 242 BBLS SEAWATER PUMPED, BEGAN SEEING ARCTIC PAC IN RETURNS SHUT DOWN AND LINED UP RETURNS TO THE FLOWBACK TANK BEFORE RESUMING CIRCULATION -SHUT ANNULAR AND PUMP ADDITIONAL 150 BBLS OR HEATED SEAWATER TAKING RETURNS TO THE FLOW BACK TANK ICP-W/5 BPM,420 PSI,FCP WITH 5.5 BPM-360 PSI.RECIPROCATING PIPE -FLOW CHECK THE WELL-WELL NOT FLOWING,GAS BREAK OUT AT SURFACE FROM ARCTIC PAC 06 00 - 08:30 2.50 CUT P DECOMP CIRCULATE BOTTOMS UP THROUGH THE GAS BUSTER PJSM FOR PUMPING THROUGH THE GAS BUSTER:DISCUSS PROPER LINE UP AND PUMP RATES -217 GPM,160 PSI -VERIFIED 0 PRESSURE AND 0 FLOW FOR 10 MINUTES OPENED ANNULAR -VISUAL FLOWCHECK-WELLBORE STABLE. STILL OBSERVING GAS BREAKOUT 08:30 - 10:30 2.00 CUT P DECOMP PUMP 40 BBL DEEP CLEAN PILL -PUMPED DEEP CLEAN PILL AROUND AT 463 GPM,450 PSI -CHASE WITH TWO FULL SURFACE TO SURFACE CIRCULATIONS OF HEATED 8.5 PPG SEAWATER -STILL SEEING A NOTICEABLE AMOUNT OF ARCTIC PAC IN RETURNS -WELL STILL BUBBLING WITH PUMPS OFF WITH NO FLOW OBSERVED Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP • Page 18 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:30 - 11:00 0.50 CUT P DECOMP DRESS OFF 9-5/8"CASING STUB AT 2,290' OBTAIN PARAMETERS PRIOR TO DRESSING STUB -99K PUW,103K SOW,100K ROT W/60 RPM. 256 GPM,140 PSI,1-2K TQ OFF BOTTOM, 2-5K TO ON BOTTOM -TAG STUB AT 2,290'AND WORK OVER 9-5/8" CASING STUB TO INNER DRESS OFF MILL(7' SWALLOW) DRESS OFF STUB AND MILLA TOTAL OF 6" OFF TOP OF STUB -WORK MILL OVER STUB WITHOUT ROTATION AND WITHOUT PUMPS TO ENSURE 'ADEQUATE DRESSING *DISCUSS PLAN FORWARD TO TEST CASING PRIOR TO POOH WITH BP ODE,ETL,ROTARY SUPERINTENDENT,AND OTL TO VERIFY INTEGRITY OF MECHANICAL BARRIERS AND THAT GAS BUBBLING IS BREAKOUT FROM !THE ARCTIC PAC,NOT FORMATION GAS 11:00 - 12:30 1.50 CUT P DECOMP PUMP 30 BBL HIGH VIS SWEEP -PUMP 30 BBL HIGH VIS SWEEP TO CLEAN METAL SHAVINGS OUT OF HOLE -426 GPM,300 PS,20 RPM W/1-2K TO -WORK PIPE WITH CASING SCRAPER AT ECP DEPTH AT 2,267'MD -CHASE PILL WITH 8.5 PPG SEAWATER AND CHASE PILL SURFACE TO SURFACE WITH HEATED 8.5 PPG BRINE -WHEN PILL AT SURFACE,DECREASE RATE TO 255 GPM W/160 PSI 95K PUW,100K SOW,100K ROT W/1K TQ AT 60 RPM -4 VIS CUPS OF METAL RECOVERED FROM MAGNETS -SMALL AMOUNTS OF ARCTIC PAC STILL BEING OBSERVED IN -24 HR NOTICE FOR BOP TEST MADE TO AOGCC AT 11:00 12:30 - 13:00 0.50 CUT P DECOMP FLOW CHECK WELL FLOW CHECK WELL-STILL OBSERVING GAS BREAKOUT AT SURFACE WITH NO GAINS -POOH F/2,290'TO 2,229'MD -BLOW DOWN TOP DRIVE 13:00 - 14:30 1.50 CUT C DECOMP PRESSURE TEST 9-5/8"CASING TO CONFIRM WELL BARRIER ENVELOPE -PJSM FOR PRESSURE TESTING 9-5/8" CASING.DISCUSSED EXCLUSION ZONES AND KEEPING NON-ESSENTIAL PERSONAL OUT OF HIGH PRESSURE AREAS -PRESSURED UP 9-5/8"CASING TO 250 PSI LOW/2,000 PSI HIGH FOR 5/30 MIN-GOOD TEST 57 STKS,4.8 BBLS TO PRESSURE UP TO 2,000 PSI.4.5 BBLS BLED BACK TO TRIP TANK -DISCUSSED RESULTS WITH ODE Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP Page 19 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:30 - 15:30 1.00 CUT C DECOMP MONITOR WELL AND RIG DOWN TEST EQIPMENT -FLOW CHECK WELL FOR 10 MINUTES- STILL OBSERVING GAS BREAKOUT AT SURFACE WITH NO GAINS -MONITOR WELL ON TRIP TANK -RIG DOWN TEST EQUIPMENT BLOW DOWN CHOKE AND KILL LINES 15:30 - 17:00 1.50 CUT P DECOMP POOH F/2,229'TO 330'MD POOH.ON ELEVATORS RACKING BACK 4"DP STANDS 95K PUW,98K SOW AT 2,220'MD -FLOW CHECK WELL FOR 10 MINUTES- STILL OBSERVING GAS BREAKOUT AT SURFACE WITH NO GAINS -MW=8.5 PPG IN/OUT 17:00 - 18:30 1.50 CUT ! DECOMP LD 12-1/4"DRESS OFF BHA -PJSM FOR LD BHA.DISCUSS PLAN FOR NON-SHEARABLES ACROSS STACK AND HAND SAFETY WHEN BREAKING APART BHA -RACK BACK 2 STANDS 6-1/4"DC IN DERRICK -DRILL COLLARS,CASING SCRAPER,AND JUNK BASKET LOADED WITH OF ARCTIC PAC 3 GALLONS ARCTIC PAC AND METAL SHAVINGS RECOVERED FROM BOOT BASKET 18:30 - 20:30 2.00 `CUT C DECOMP DISCUSS PLAN FORWARD DUE TO LARGE AMOUNTS OF ARTIC PAC ON BHA —SIM-OPS- -CLEAN AND CLEAR RIG FLOOR -MOBILIZE 12-1/4"OD STRING MILL FROM BAKER SHOP -SERVICE TOP DRIVE AND BLOCKS -INSPECT SAVER SUB WITH XT39 THREAD GAUGES AND PER MANUFACTURES RECOMMENDATION(GOOD CONDITION) -CALIBRATE BLOCK HEIGHT -WORK ON MP-2'S -CONDUCT SPILL DRILL 20:30 - 23:30 3.00 CUT C DECOMP MU 12-1/4"CLEANOUT BHA#4 FOR ADDITIONAL CLEANOUT RUN OF ARCTIC PAC -MU AS DIRECTED BY BAKER REP 1 -PJSM WITH EMPHASIS ON HAND SAFETY WHILE HANDLING HEAVY TOOLS 23:30 - 00:00 0.50 CUT C DECOMP RIH WITH CLEANOUT BHA FOR ADDITIONAL CLEANOUT RUN DUE TO EXCESSIVE ARCTIC PAC -RIH F!243'T/907'MD PICKING UP 4"DP SINGLES -MONITOR TRIP ON TRIP TANK MW=8.5PPG IN/OUT 2/16/2015 00:00 00.30 0.50 CLEAN P DECOMP RIG SERVICE -LUBRICATE RIG Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP S Pape 20 of 70 Operation Summary Report Common Well Name 09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) , Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) _ 00:30 - 02:30 2.00 CLEAN C DECOMP RIH ON ELEVATORS FOR 13-3/8"CLEANOUT RUN RIH F/907'17 2,263'MD PICKING UP 4"DP SINGLES -ENCOUNTERED TIGHT SPOT AT 1,349'MD REQUIRING 15K TO PASS THROUGH -WORKED THROUGH TIGHT SPOT SEVERAL -TIMES WITH LAST PASS TAKING 2K WEIGHT 02 30 - 03:00 0.50 CLEAN C i DECOMP WASH 12-1/8"DRESS OFF MILL OVER CASING STUB AT 2,291'MD -OBTAIN PARAMETERS AND SPR'S. -WORK DRESS OFF MILL OVER 9-5/8" CASING STUB WITH NO ROTATION *TO ENSURE NOTHING FELL ONTO STUB AFTER WORKING THROUGH TIGHT SPOT AT 1,349'MD -103K PUW,99K SOW @ 422 GPM,350 PSI 03:00 - 04:00 1.00 CLEAN C DECOMP ,PUMP 60 BBL DEEP CLEAN PILL AND 25 BBL HIGH VIS SWEEP -RACK ONE JOINT BACK TO 2,230'MD -PUMP 60 BBL 135 DEG DEEP CLEAN PILL AT 220 GPM,80 PSI -FOLLOW WITH 25 BBL HIGH VIS(200 VIS) SWEEP WHILE RECIPROCATING WITHOUT ROTATION -CHASE WITH 130 DEG 8.5 PPG SEAWATER AT 473 GPM,410 PSI -103K PUW,99K SOW *WITH SWEEP AT BOTTOMS UP,MINIMAL AMOUNTS OF ARCTIC PAC OBSERVED PJSM FOR UPCOMING PUMP OUT OF HOLE FROM 2,130'MD 04:00 - 07:30 3.50 CLEAN P DECOMP PUMP OUT OF HOLE F/2,130'T/988'MD -FLOW CHECK WELL FOR 10 MIN PRIOR TO POOH-STATIC WITH NO GAS BREAKOUT -OBTAIN PARAMETERS AT 2,130'MD -109K PUW,99K SOW AT 2240' -PUMP OUT OF HOLE F/2,130'MD T/250'MD -450 GPM,420 PSI -TIGHT SPOT SEEN AT 825',WORK THE PIPE THROUGH MULTIPLE TIMES WITH UP TO 20K OVERPULL,LAST TIME THROUGH 10K OVERPULL 07:30 - 10:30 3.00 CLEAN P DECOMP LAY DOWN BHA -FLOW CHECK PRIOR TO PULLING ,NON-SHEARABLES ACROSS STACK GAS BREAKOUT WITH NO FLOW OBSERVED -RACK BACK COLLARS AND LAY DOWN BHA -VERY LITTLE ARCTIC PAC OBSERVED ON BHA I-TABLE TOP KICK DRILL WHILE 'NON-SHEARABLES ACROSS STACK 10:30 - 12:00 1.50 BOPSUR P DECOMP PULL WEAR RING -FUNCTION RAMS AND NOTICED A LOT OF ARCTIC PACK IN RAM CAVITY -MAKE UP STACK WASHER TO FLUSH STACK.CIRC AT 336 GPM,RD STACK WASHER j -PULL WEAR RING AND VERIFY MEASURMENT OF LDS -SET TEST PLUG AND VERIFY MEASURMENT I OF LDS Printed 3/24/2015 2:36:10PM North America-ALASKA-BP Page 21 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: IX3-0161 V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 14:00 2.00 BOPSUR P DECOMP RIG UP TO TEST BOPE -PJSM FOR TESTING BOPE -MAKE UP FOSV'S -RIG UP TEST EQUIPMENT -SUCK OUT BOP STACK 14.00 20:30 6.50 BOPSUR P DECOMP TEST BOPE TO 250 PSI LOW/3500 PSI HIGH FOR 5 MIN LOW/5 MIN HIGH TEST WITH 4",4-1/2,AND 9-5/8"TEST JOINTS -CONDUCTED BOP DRILL,6 BBLS TO FILL MUD GAS SEPARATOR U-TUBE -ALL TESTS CHARTED,SEE ATTACHED BOP TEST CHARTS -NO TEST FAILURES TEST WITNESSED BY CHUCK SHEVE 20:30 - 21:00 0.50 BOPSUR P DECOMP RIGDOWN TEST EQUIPMENT -REMOVE TEST JOINTS FROM PIPE SHED -BLOW DOWN CHOKE&KILL LINES 21:00 - 00:00 3.00 CASING P DECOMP PREPARE TO RUN 9-5/8"CASING TIE BACK STRING -MU SAFETY JOINT WITH 9-5/8"LIFTER MOBILIZE TOOLS&EQUIPMENT FOR UPCOMING OPERATION BRING 9-5/8"PUPS AND CEMENT HEAD INTO PIPE SHED -RIG UP ULTRA HIGH TORQUE DOUBLE STACK TONGS -ENSURE 9-5/8"HYDRIL 563 XO IS MU TO FOSV 2/17/2015 00:00 - 00:30 0.50 CASING P DECOMP PJSM FOR 9-5/8"CASING PATCH TIE BACK -PJSM HELD WITH BAKER FISHING,BAKER COMPLETION,DOYON CASING,HES COMPLETION,AND RIG CREW. -DISCUSS UPCOMING CASING PATCH TIE BACK.,3RD PARTY REPS ON LOCATION,THE IMPORTANCE OF TRACKING FLUIDS, NON-SHEARBLES ACROSS STACK,AND THE IMPORTANCE OF THE PRESSURE CROSS-CHECK CHECKLIST FOR WORKING SAFELY WITH HIGH PRESSURES. -VERIFIED 9-5/8"CASING PIPE COUNT WITH DRILLER,WSL,BAKER REPS,HALLIBURTON REPS,AND TOURPUSHER Printed 3/24/2015 2:36:10PM North America-ALASKA-BP Page 22 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:OOAM Rig Release: Rig Contractor DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 00:30 - 05:30 5.00 CASING P DECOMP RUN 9-5/8",47#,L-80 HYD 563 CASING AND BOWEN PATCH F/SURFACE T/2,293'MD. -DRILLER AND LEAD FLOOR HAND VERIFY CORRECT LIFTING EQUIPMENT SIZE AND RATING. -PU BOWEN PATCH,REVERSE FLOAT, AND ECP ASSEMBLY. -VERIFY CORRECT SHEAR SCREW NUMBER AND RATING OF ECP,PER BAKER REP. VERIFY 1/4"HOLE IN FLOAT. ALL CONNECTIONS BELOW ES-CEMENTER BAKER-LOC'D. -USE JET-LUBE SEAL GUARD THREAD COMPOUND. -TORQUE TURN CONNECTIONS TO 15,800 FT-LBS. RUN 1 FREE FLOATING CENTRALIZER PER JT ON JTS 1-55. -VERIFIED AUTO FILL OF CASING DUE TO REVERSE FLOAT WHILE RIH. OBTAIN PARAMETERS PRIOR TO SETTING 'DOWN ON STUB AT 2,290'MD -PU 146K,SO 150K. SET BOWEN PATCH OVER STUMP PER BAKER REP. -PULL 100K OVER TO VERIFY PATCH ENGAGED. SET CASING IN SLIPS AND MAKE UP CEMENT HEAD. PICK UP 100K OVER STRING WEIGHT. 05:30 - 07:00 1.50 CASING P DECOMP PRESSURE TEST CASING PATCH AND ECP -HOLD PJSM AND REVIEW PRESSURE CROSSCHECK LIST. -FILL LINES AND CHECK FOR LEAKS. -PRESSURE TEST INSIDE CASING TO 1100 PSI FOR 5 MIN,TEST GOOD. -INCREASE PRESSURE TO 1600 PSI,OPEN ECP INFLATION CONTROL VALVE,OBSERVE PSI DROP AS ECP INFLATES. -INCREASE PRESSURE TO 2000 PSI,CLOSE ECP INFLATION CONTROL VALVE AND HOLD FOR 10 MINUTES,TO ENSURE VALVE CLOSED. -BLEED PRESSURE TO 0 PSI. 07:00 - 07:30 0.50 CASING P DECOMP OPEN ES-CEMENTER -PRESSURE TO 3000 PSI,OBSERVE ES-CEMENTER SHEAR OPEN. 07:30 - 09:30 2.00 CASING P DECOMP PREPARE FOR 9-5/8"CEMENT JOB -BYPASS CHOKE SKID WITH HARDLINE -TEST HARDLINE TO FLOWBACK TANK TO 250 LOW/3000 PSI LOW/HIGH FOR 5 MIN EA FREEZE PROTECT HARDLINE TO FLOWBACK TANK -SPOT SLB CEMENTERS COMING FROM ANOTHER JOB Printed 3/24/2015 2:36:10PM North America-ALASKA-BP Page 23 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:30 - 11:00 1.50 CASING P DECOMP CIRCULATE CIRCULATE 300 BBL,120°F,8.5 PPG SEAWATER,210 GPM,90 PSI,100% RETURNS. SIM-OPS=PRESSURE TEST SLB LINES AND RIG CEMENT LINES,250 PSI/4000 PSI,5 MIN /5 MIN,TEST GOOD. 11:00 15:30 4.50 CASING N DECOMP THAW HARD LINE BACK TO FLOW BACK TANK BATCH MIX 5 BBL 15.8PPG CLASS G CEMENT DISCOVERED HARDLINE FROZEN TO FLOWBACK TANK -DISCUSS CEMENT PUMPING OPTIONS WITH ODE -DECISION MADE TO DISPOSE OF 5 BBLS BATCH MIXED CEMENT IN TOTE CIRCULATE 2 BPM,20 PSI WHILE THAWING HARD LINE,100%RETURNS 1*VAC TRUCK DEPRESSURIZING MISTED OUT VENT TUBE. 15:30 - 18:30 3.00 CASING P DECOMP 'CEMENT 9-5/8"CASING AS FOLLOWS PUMP 5 BBLS OF 8.34 PPG WASH UP WATER. -PUMP 156 BBLS OF 15.80 PPG CLASS G TAIL CEMENT @ 5.0 BPM,YIELD 1.17 CU.FT/SK. -DROP TOP PLUG. PERFORM DISPLACEMENT WITH SLB AND 8.60 PPG SEAWATER PER SLB CADE. -115 BBLS DISPLACED AT 5.0 BPM:ICP 20 PSI 100%RETURN FLOW,FCP 444 PSI 100% RETURN FLOW. -SHUT DOWN PUMPS,CLOSED ANNULAR AND LINED UP TO FLOW BACK TANK. 40 BBLS,(155 TOTAL) DISPLACED AT 5.0 BPM:ICP 874 PSI 100%RETURN FLOW,FCP 1286 PSI 100%RETURN FLOW -REDUCE RATE TO 0.5 BPM AT 155 BBLS TOTAL DISPLACED PRIOR TO PLUG BUMP, FCP PRESSURE 929 PSI -BUMP PLUG AT 167.2 BBLS TOTAL DISPLACED AND INCREASE PRESSURE TO 1749 PSI,OBSERVE ES CEMENTER CLOSE. -BLEED PRESSURE OFF AND CHECK FOR FLOW.ZERO FLOW OBSERVED FOR 10 MINUTES TOTAL DISPLACEMENT VOLUME 167.2 BBLS (MEASURED BY SLB METER). -CEMENT RETURNS AT SURFACE AT 135 BBLS DISPLACED,ESTIMATED 21 BBLS OF CEMENT TO SURFACE. -O LOSSES DURING CEMENT JOB. -CEMENT IN PLACE AT 18:11 HRS. Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP S Page 24 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:30 - 19:00 0.50 CASING P DECOMP FLUSH OUT STACK TO CLEAN UP CEMENT -PUMP 60 BBL BLACKWATER PILL DOWN KILL LINE AND OUT TO FLOWBACK TANK AT 133 GPM W/60PSI TO CLEAN RESIDUAL CEMENT OUT OF STACK -FOLLOW WITH 20 BBL SEAWATER TO FLUSH OUT BLACKWATER PILL CONFIRM 0 PSI BELOWANNULAR AND OPEN ANNULAR 19:00 - 21:30 2.50 CASING P DECOMP RIG DOWN CEMENTING EQUIPMENT RIG DOWN CEMENT HEAD CROSSOVER -SUCK OUT THE CASING FOR CASING CUT -BLOW DOWN CHOKE,KILL,AND HOLE FILL LINES DRAIN THE STACK -LAY DOWN HALLIBURTON CEMENT HEAD SIM-OPS,BLOW DOWN AND FREEZE PROTECT HARD LINE TO FLOWBACK TANK 21:30 - 00:00 2.50 BOPSUR P DECOMP NIPPLE DOWN BOPE -PJSM FOR N/D BOPE.FOCUSED ON OVERHEAD LOADS AND PROPER COMMUNICATION WHEN LIFTING STACK. SPLIT STACK BELOW TUBING SPOOL AND LIFT STACK OFF WELLHEAD. SIM-OPS,DISASSEMBLE UHT STACKED j TONGS. 2/18/2015 00:00 - 02:00 2.00 WHSUR P DECOMP SET EMERGENCY SLIPS AND CUT 9-5/8" CASING -PJSM WITH FMC CONCERNING COMMUNICATION WHILE LIFTING STACK AND MAKING SURE BOP HOISTS ARE LOCKED OUT PRIOR TO INSTALLING SLIPS. -WITH 100K OVER STRING WEIGHT PULLED ON CASING,FMC INSTALL EMERGENCY SLIPS. -SET DOWN 100K PER FMC REP. -CONFIRM SLIPS SET AND PICK UP 2K FOR CASING CUT. -INSTALL WACHS CUTTER AND CUT 9-5/8" CASING. -PULL 9-5/8"CUT JOINT TO FLOOR AND LD IN PIPE SHED. -RD WACHS CUTTER AND PREP TO SET STACK BACK ON WELLHEAD. 02:00 - 03:00 1.00 WHSUR P DECOMP ,REMOVE TUBING SPOOL -SET 80P STACK BACK ON WELLHEAD. -NIPPLE DOWN EXISTING TUBING SPOOL FROM BOP AND SET BOP STACK BACK ON STUMP. -REMOVE EX STING TUBING SPOOL FROM WELLHEAD. -INSTALL 9-5/8"PACKOFF AND RILDS. 03:00 - 06:30 3.50 WHSUR P DECOMP INSTALL NEW TUBING SPOOL -INSTALL NEW TUBING SPOOL. INSTALL NEW CASING PACK-OFF. -TEST PACKOFF AND LOWER SPOOL BREAK TO 250 PSI/3500 PSI,FOR 5 MIN/30 MIN, TEST GOOD. Printed 3/24/2015 2.36:10PM • North America-ALASKA-BP Page 25 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. - UWI:500292020900 Active datum:09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:30 - 10:30 4.00 I BOPSUR P DECOMP N/U BOPE -PJSM FOR N/U,REVIEW DOYON PROCEDURE,DISCUSS LIFTING HAZARDS AND SAFE OPERATION OF TORQUE WRENCH. -N/U BOP STACK ON NEW TUBING SPOOL. -M/U FLOW LINE TO BELL NIPPLE. _ 10:30 - 15:30 5.00 BOPSUR P DECOMP "CHANGE UPPER RAMS PJSM FOR RAM CHANGE-FALL PROTECTION,OVERHEAD WORK,AND EXCLUSION ZONES WITH SIGNAGE. -CHANGE OUT UPPER RAMS FROM 9-5/8"TO 7". -CENTER STACK CHANGE OUT AIR BOOT FITTINGS FROM QUICK CONNECT TO SCREW IN TYPE SIM-OPS=GET EQUIPMENT READY TO TEST BOPE 15:30 - 18:00 2.50 BOPSUR P DECOMP TEST BOPE -R/U TEST EQUIPMENT -TEST UPPER 7"RAMS,AND BODY TEST BOPE FOR 250 PSI LOW/3,500 PSI HIGH FOR 5 MINUTES EACH -R/D TEST EQUIPMENT -INSTALL WEAR RING&RILDS.VERIFY CORRECT LDS MEASUREMENT -BLOW DOWN KILL LINES 18:00 - 20:00 2.00 CLEAN P - WEXIT MAKE UP 9-5/8"CLEAN OUT BHA -PJSM FOR M/U 9-5/8"CLEANOUT BHA- DISCUSS PLAN FOR NON-SHEARABLES ACROSS STACKAND FLUID TRACKING WHILE RIH -RIH W/BHA T/225' -COMPLEX KICK WHILE TRIPPING DRILL HELD WHILE NON-SHEARABLES ACROSS STACK.AAR FOLLOWING DRILL 20:00 - 22:00 2.00 CLEAN P WEXIT RIH W/9-5/8"CLEAN OUT BHA -RIH ON ELEVATORS F/228'1/2,127'MD -90K PUW,95K SOW @ 2,127'MD -FILL PIPE AND CIRCULATE AT 82 GPM W/50 PSI. -BLOW DOWN TOP DRIVE 22:00 - 00:00 2.00 CLEAN N CEMT 2,290.00 WEXIT WAIT ON 700 PSI CEMENT COMPRESSIVE STRENGTH -MONITOR WELLBORE ON TRIP TANK WHILE WAITING ON CEMENT COMPRESSIVE STRENGTH SIM-OPS=WORK ON CUTTINGS CONVEYOR 'ROLLER 2/19/2015 00:00 - 02:30 2.50 CLEAN N CEMT 2,290.00 WEXIT WAIT ON 700 PSI CEMENT COMPRESSIVE STRENGTH -MONITOR WELLBORE VIA TRIP TANK WHILE WAITING ON CEMENT COMPRESSIVE STRENGTH SIMOPS,WORK ON CUTTINGS CONVEYOR ROLLER,LUBRICATE RIG AND TOP DRIVE Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP • Page 26 of 70 Operation Summary Report Common Wet Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. _ UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:30 - 06:30 4.00 CLEAN P WEXIT DRILL OUT 9-5/8"CASING PATCH ES CEMENTER AND SHOE TRACK -OBTAIN PARAMETERS AND SPRS AT 2,127' MD -PU 100K,SO 100K ROT 100K -TAG CEMENT STRINGERS AT 2212',WASH DOWN TO WIPER PLUG AT 2,241'MD MILL WIPER PLUG AND ES CEMENTER F/ 2,241'T/2,249' 346 GPM,390 PSI ON BOTTOM,360 PSI OFF BOTTOM -80 RPM,TQ ON 2-5K -WASH DOWN F/2,249'T/2,286'AT SAME FLOW RATE 06:30 - 08:00 1.50 CLEAN P WEXIT DRILL OUT REVERSE FLOAT SHOE F/2,286'T/ 2,288'MD -346 GPM,390 PSI -80 RPM,TQ ON 1-2K -PU 100K,SO 100K,ROT 100K -CIRCULATE-HIGH VIS SWEEP SURFACE TO SURFACE -529 GPM,870 PSI,60 RPM,TQ 1K MONITOR WELLBORE FOR 10 MINUTES- STATIC 08:00 - 10:00 2.00 CLEAN P WEXIT RIH ON ELEVATORS -RIH WITH 8-1/2"CLEANOUT BHA F/2,288'T/ 5,320'MD -MONITOR HOLE FILL ON TRIP TANK -TAG TUBING STUB AT 5,320' -PU 133K,SO 135K AT 5,300' 10:00 12:30 2.50 CLEAN P WEXIT I DISPLACE WELLBORE TO 8.5 PPG SEAWATER i -DISPLACE 9.8 PPG BRINE BELOW CASING PATCH OUT OF HOLE WITH 8.5 PPG SEAWATER -256 GPM,480 PSI -PUMP HIGH VIS SWEEP SURFACE TO SURFACE -471 GPM,1100 PSI,20 RPM,TQ 1K OBTAIN SPRS WITH 8.5 PPG SEAWATER AT 5,317'MD 12:30 - 14:30 2.00 CLEAN P WEXIT SAFETY STAND DOWN FOR RIG AUDIT WITH BERNARD LOONEY&BP UPPER MANAGEMENT -MONITOR WELL FOR 10 MINUTES,STATIC -SEAWATER 8.5 PPG IN,8.5 PPG OUT -POOH ON ELEVATORS F/5,317'T/5,260' -PU 143K,SO 145K AT 5,317'MD -BLOW DOWN TOP DRIVE -MONITOR WELL ON TRIP TANK DURING SAFETY STANDOWN MEET WITH BP UPPER MANAGEMENT 14:30 - 16:30 2.00 CLEAN P WEXIT POOH ON ELEVATORS TO PRESSURE TEST 9-5/8"CASING -TOOLBOX PJSM AND RESUME OPERATIONS -SEAWATER 8.5 PPG IN,8.5 PPG OUT -POOH ON ELEVATORS F/5,260'T/323' -MONITOR HOLE FILL ON TRIP TANK -MONITOR WELLBORE FOR 10 MINUTES PRIOR TO PULLING NON-SHEARABLES ACROSS STACK,STATIC Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP • Page 27 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:OOAM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual Ca 53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:30 - 19:00 2.50 CLEAN P WEXIT i LD 9-5/8"CLEANOUT BHA PJSM FOR LD BHA.DISCUSSED WELL CONTROL PLAN WITH NON-SHEARABLES ACROSS STACK ALONG WITH HAND SAFETY WHILE USING RIG TONGS AND HANDLING LARGE TOOLS -STAND BACK 2 STANDS 6-1/4"DC -LD BHA PER BAKER REP -CLEAN AND CLEAR RIG FLOOR -RIG UP TO PRESSURE TEST 9-5/8"CASING 19:00 - 22:00 3.00 CLEAN P WEXIT PRESSURE TEST 9-5/8"CASING PJSM FOR PRESSURE TESTING 9-5/8" CASING.WENT OVER PRESSURE CROSSCHECK LIST PRESSURE TEST CASING TO 250 PSI /3,500 PSI FOR 5 MIN/30 MIN,GOOD TEST -7 BBLS PUMPED TO PRESSURE UP TO 3,500 PSI,7 BBLS BLED BACK -BLOW DOWN CHOKE&KILL LINES *RECEIVE WTL APPROVAL TO PROCEED 22:00 - 00:00 2.00 CLEAN P WEXIT PU SMITH 9-5/8"TRACKMASTER WHIPSTOCK PJSM WITH SLB REP AND DOYON,FIRST TIME PICKING UP SMITH WHIPSTOCK. ADDRESS HANDLING OF WHIPSTOCK,CARE REQUIRED TO AVOID SHEARING SLIPS. DISCUSS HOW THE WHIPSTOCK WILL BE SECURED IN ROTARY TABLE. -P/U TRI-MILL AND BREAK OFF LIFT SUB PER SLB REP -P/U FLOAT SUB AND ATTEMPT TO MAKE UP -THREADS ON FLOAT SUB GALLED,NO BACK UP ON LOCATION ' I *0 BBLS 8.5 PPG SEAWATER LOST 2/20/2015 00:00 - 05:00 5.00 STWHIP N I WAIT 5,319.00 WEXIT WAIT ON FLOAT SUB ATTEMPT TO FIND BACKUP FLOAT SUB ON SLOPE,UNSUCCESSFUL(THIS FLOAT SUB IS NC50 ON BOTH CONNECTIONS,TYPICAL FLOAT SUB HAS A BOTTOM CONNECTION THAT IS REGULAR). -SEND FLOAT SUB TO BAKER MACHINE TO HAVE THREADS AND BORE RE-CUT. *PERFORM RIG MAINTENANCE,MP-2'S,AND GENERAL HOUSEKEEPING 05:00 - 09:30 4.50 STWHIP P WEXIT PU SMITH 9-5/8 TRACKMASTER WHIPSTOCK -PU RE-CUT FLOAT SUB&MU TO TRI-MILL. -SET TRI-MILL IN MOUSE HOLE AND PU WHIPSTOCK. -MU TRI-MILL TO WHIPSTOCK RAMP. 09:30 - 14:30 5.00 STWHIP P WEXIT RIH ON ELEVATORS W/9-5/8"WHIPSTOCK BHA. -RIH F/962'MD T/2,863'MD. BREAK CIRCULATION EVERY 1,900'MD. -PERFORM SHALLOW TEST ON MWD TOOLS AT 1,529'MD. -500 GPM,1,110 PSI. -RIH F/2,863'MD T/4,760'MD. FILL PIPE EVERY 1,900'MD. -166 GPM,160 PSI. Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP • Page 28 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date. X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum.09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:30 - 17:30 3.00 STWHIP P WEXIT SLIP AND CUT 59'OF DRILLING LINE. -PJSM,INSPECT SAVER SUB,BRAKE BANDS. -CALIBRATE BLOCK HEIGHT FOR SLB. FUNCTION TEST COM. 17:30 - 18:00 0.50 STWHIP P WEXIT RIH ON ELEVATORS F/4,760'MD T/4,855'MD. PJSM W/SLB MWD AND DD,GEO,WSL,AND DRILLER FOR GAMMA RAY TIE IN. 18:00 - 20:30 2.50 STWHIP P WEXIT LOG FOR FORMATION GAMMA RAY TIE IN -PU 163K,SO 165K. -500 GPM,1700 PSI. -LOG WELLBORE,6 FPM F/4,855'T/5,139' MD. -OBSERVE GAMMA RAY MARKER AT 4,996'. -LOG WELLBORE,6 FPM F/5,139'T/4,988'. -OBSERVE GAMMA RAY MARKER AT 4,996'. -CORRELATE DEPTH 1'DEEPER THAN j GAMMA RAY MARKER ON CAST-M LOG, DATED 02-11-2015. 20:30 - 22:00 1.50 STWHIP P WEXIT SET WHIPSTOCK ,-OBTAIN PARAMETERS,PU 168K,SO 168K. -ORIENT TOOL FACE 46 DEGREES RIGHT. -WASH DOWN F/4,988'T/5,319',TAG STUMP 1 AT 5,319',SET 5K DOWN -500 GPM,1710 PSI. -PU 10'AND SHUT PUMPS DOWN,RIH T/ 5,319 AND SHEAR ANCHOR WITH 10K DOWN. -POOH F/5,319'T/5,259'. VERIFY WHIPSTOCK ORIENTATION. -SLACK OFF 1',OBSERVE STRING TAKING WEIGHT,PLACING BOTTOM OF WHIPSTOCK AT 5,260'. -FATIGUE SHEAR BOLT,SET DOWN 15K,PU TO NEUTRAL,SET DOWN 30K,PU TO NEUTRAL,SET DOWN 58K AND SHEAR. TOP OF WHIPSTOCK AT 5,236'. 22:00 - 00:00 2.00 STWHIP P WEXIT DISPLACE WELL -OFFLOAD REMAINING SEAWATER FROM PITS. -PUMP 30 BBL HI-VIS SPACER. -DISPLACE WELL TO 9.5 PPG LSND MILLING FLUID. -500 GPM,1300 PSI. 2/21/2015 00:00 - 02:30 2.50 STWHIP P WEXIT DISPLACE WELL -CONTINUE TO DISPLACE WELL. -PUMP 30 BBL HI-VIS SPACER. -DISPLACE WELL TO 9.5 PPG LSND MILLING FLUID. -500 GPM,1300 PSI,400 BBLS TOTAL PUMPED. -CLEAN UNDERNEATH SHAKERS,CLEAN PITS 1,2,AND 3. MOVE MILLING FLUID TO ACTIVE SYSTEM. OBTAIN SPR'S AT 5,235'MD Printed 3/24/2015 2:36:1QPM • North America-ALASKA-BP • Page 29 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:OOAM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:30 - 07:30 5.00 STWHIP P WEXIT MILL WINDOW • -MILL F/5,236'T/5,250'. -PU 165K,SO 163K,60 RPM,WOB 1-2K,TQ OFF 2K,TQ ON 7-12K. 1-DRILL FORMATION F/5,250'T/5,263'. -PU 165K,SO 163K,60 RPM,WOB 2-6K,TQ OFF 2K,TQ ON 2-7K.. -WORK MILL THROUGH WINDOW WITH ROTATION AND PUMPS 2X'S TOW 5236',BOW 5250'. 07:30 - 09:30 2.00 STWHIP P WEXIT CBU PRIOR TO POOH -CBU 1.5 TIMES -CIRCULATE SUPER SWEEP SURFACE TO SURFACE. -450 GPM,1300 PSI. -OBSERVE 15%INCREASE IN CUTTINGS WHEN SWEEP AT SURFACE. 09:30 - 12:00 2.50 STWHIP P WEXIT POOH ON ELEVATORS F/5,211'T/1,888'MD PJSM FOR POOH ON ELEVATORS MONITOR WELLBORE FOR 10 MIN PRIOR TO POOH-STATIC -PUMP 15 BBL 10.6 PPG DRY JOB RACK BACK 1 STAND 4"DP I- BLOW DOWN TOP DRIVE AND LINE UP TO TT POOH ON ELEVATORS F/5,211'T/1,888'MD 'RACKING BACK 4"DP STANDS MONITOR TRIP VIA TT -MW=9.5 PPG IN/OUT 0 BBLS FLUID LOST DURING TOUR 12:00 - 12:30 0.50 STWHIP P WEXIT RIG SERVICE ,-LUBRICATE RIG 12:30 - 13:00 0.50 STWHIP P WEXIT POOH ON ELEVATORS F/1,888'T/1,033'MD 120K PUW,120K SOWAT 1,888' 13:00 - 16:00 3.00 STWHIP P WEXIT LD 8-1/2"WHIPSTOCK MILL BHA -PJSM FOR LD BHA.DISCUSSED PLAN FOR NON-SHEARABLES ACROSS STACK AND HANDLING LARGE TOOLS -MONITOR WELLBORE FOR 10 MINUTES PRIOR TO PULLING NON-SHEARABLES ACROSS STACK RACK BACK 6 STANDS 5"HWDP l '-LD BHA PER SLB REP 16:00 - 17:30 1.50 STWHIP P WEXIT FLUSH BOP STACK AFTER MILLING OPERATIONS -PU STACK WASHER AND FLUSH STACK SIM-OPS-CLEAN AND CLEAR RIG FLOOR, MOBILIZE DRILLING BHA TOOLS TO RIG FLOOR,BLOW DOWN TOP DRIVE,BLOW DOWN CHOKE AND KILL LINES 17:30 - 18:30 1.00 STWHIP P WEXIT I SERVICE AND INSPECT TOP DRIVE Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP • Page 30 of 70 Operation Summary Report ._.____............... Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) L (usft) 18:30 - 22:30 4.00 STWHIP P WEXIT MU 8-1/2"DRILLING BHA -PJSM FOR MU 8-1/2"DRILLING BHA -PU 6-3/4"MUD MOTOR -WHILE PU MOTOR AND DOING CHECKS,DD NOTICED ABNORMAL MOVEMENT IN THE ROTOR. -LD MOTOR PER SLB DD AND PU SPARE MU BHA AND RIH T/744'MD 22:30 - 23:00 0.50 STWHIP P WEXIT RIH ON ELEVATORS W/4"DP STANDS I3IH W/8-1/2"DRILLING BHA F/744'T/1,503' MD 23:00 - 23:30 0.50 STWHIP P WEXIT SHALLOW TEST MWD AT 1,503'MD -500 GPM W/1,050 PSI-GOOD TEST -BLOW DOWN TOP DRIVE 23:30 - 00:00 0.50 STWHIP P WEXIT RIH ON ELEVATORS W/4"DP STANDS -RIH W/8-1/2"DRILLING BHA F/1,503'T/1,883' MD FILL PIPE EVERY 20 STANDS 2/22/2015 00:00 - 01:00 1.00 STWHIP P WEXIT RIG SERVICE PJSM FOR MAN RIDER AND WORKING AT HEIGHTS. -LUBRICATE RIG AND SERVICE TOP DRIVE, BLOCKS,AND DRAWWORKS. 01:00 - 02:30 1.50 STWHIP P WEXIT RIH W/8-1/2"DRILLING BHA ON ELEVATORS RIH F/1,883'T/5,206'MD. -MONITOR HOLE FILL ON TRIP TANK. -FILL PIPE EVERY 2000',126 GPM,270 PSI. 02:30 - 12:00 9.50 DRILL P INTI DRILL 8-1/2"INTERMEDIATE HOLE F/5,263'T/ 5,586'MD(5,553'TVD) -PJSM FOR DRILLING AHEAD. -ORIENT MOTOR 45 RIGHT,SHUT DOWN PUMPS AND PROCEED THROUGH WINDOW. -OBTAIN BASE LINE ECD,10.01 PPG -DRILL AHEAD AT 550 GPM,1,810 PSI ON, 1,770 PSI OFF -40 RPM,3-6K TQ ON,2-4 TQ OFF -PU 158K,SO 150K,ROT 158K,5-12K WOB -ECD:ACTUAL=10.05 PPG,CALC=9.99 PPG -SURVEY EVERY-30' -ART=0.89 HRS -AST=4.06 HRS -JAR HRS=4.95 -MW=9.5 PPG IN/OUT -OBTAIN SPRS AT 5,586'MD(5,553'TVD) 5 BBLS OF 9.5 PPG LSND LOST DURING TOUR 12:00 - 19:00 7.00 DRILL P INTI DRILL 8-1/2"INTERMEDIATE HOLE F/5,586'T/ 6,124'MD(5,995'TVD) -600 GPM,2,390 PSI ON,2,280 PSI OFF -80 RPM,3-4K TQ ON,1-2 TQ OFF -PU 170K,SO 165K,ROT 162K,6-10K WOB -ECD:ACTUAL=10.11 PPG,CALC=9.98 PPG -SURVEY EVERY-30' -MW=9.5 PPG IN/OUT -OBTAIN SPRS AT 6,058'MD(5,993'ND) Printed 3/24/2015 2:36:10PM ;r ' ,Operation Summary Report rO Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 ....__._..-.... Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 21:00 2.00 DRILL N RREP 6,124.00 INTI TROUBLESHOOT TOP DRIVE -INTERMITTENT LOSS OF ROTARY ON TOP DRIVE CIRCULATE BUS 1X BREAK OUT OF STAND -POOH F/6,124'T/6,061'MD -TROUBLESHOOT TOP DRIVE DUE TO NO 'ROTATION 21:00 - 23:00 2.00 DRILL INTI DRILL 8-1/2"INTERMEDIATE HOLE F/6,124'T/ 6,291'MD(6,206'TVD) -600 GPM,2,430 PSI ON,2,240 PSI OFF 1-80 RPM,3-5K TQ ON,2-5K TQ OFF -PU 175K,SO 166K,ROT 163K,5-10K WOB -ECD:ACTUAL=10.15 PPG,CALC=10.0 PPG SURVEY EVERY-90' I-ART=3.15 HRS -AST=1.88 HRS JAR HRS=9.98 HRS -MW=9.5 PPG IN/OUT *0 BBLS OF 9.5 PPG LSND LOST DURING 'TOUR 23:00 - 00:00 1.00 DRILL N RREP ' 6,291.00 ! INTI ,TROUBLESHOOT TOP DRIVE -EXPERIENCE INTERMITTENT LOSS OF ROTARY ON TOP DRIVE. CIRCULATE BUS 1X. -ABLE TO GET TOP DRIVE TO ROTATE, BREAK OUT SINGLE AND BRING TOP DRIVE TO FLOOR. ATTEMPT TO DIAGNOSE PROBLEM ON TOP DRIVE,UNSUCCESSFUL. -WSL CONTACT DRLG.SUPT AND ODE AND INFORM DESIRE TO PULL TO WINDOW. -POOH F/6,291'T/6,219'MD. -BLOW DOWN TOP DRIVE AND TROUBLESHOOT. 2/23/2015 00:00 - 01.00 1.00 DRILL N RREP 6,291.00 INTI POOH ON ELEVATORS -PJSM FOR POOH ON ELEVATORS. -MONITOR WELLBORE FOR 10 MIN PRIOR TO 'POOH,STATIC. MW 9.5 PPG IN/OUT -BLOW DOWN TOP DRIVE AND LINE UP TO TRIP TANK. -POOH ON ELEVATORS F/6,219'T/5,171' -PU 155K,SO 153K AT 5,171'MD. -MONITOR TRIP VIA TRIP TANK. *HELD D1 KICK WHILE TRIPPING DRILL. *AAR REVIEWED CONTINGENCY FAILURE 9.5 FAILED ELECTRIC PUMP ON KOOMEY. *AAR CORRECTED DEFICIENCY WITH THIRD PARTY CONTRACTOR RESPONSE DURING DRILL. Printed 3/24/2015 2:36:10PM II North America-ALASKA-BP 4110. Page 32 of 70 ,..., `. „'sus r ,. ..> Operation Summary Report Common Well Name 09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date. X3-0161V-C-(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:00 - 10:30 9.50 DRILL N RREP 6,291.00 INTI DIAGNOSE TOP DRIVE INTERMITTENT ROTARY FAILURE -CLEAN AND CLEAR RIG FLOOR. -STAGE TOP DRIVE AT DIFFERENT HEIGHTS WHILE ROTATING AT 80 RPM TO SEE IF THE ROTARY FAILURE WAS DUE TO AN ISSUE WITH THE ELECTRIC SERVICE LOOP. REPLACE LUBE OIL PRESSURE SWITCH. -DRAIN EXTRA OIL FROM GEAR BOX TO GET IT BACK TO PROPER LEVEL(EXTRA OIL WAS ADDED TO THE GEAR BOX WHEN THE LUBE PRESSURE FAULT FIRST APPEARED). -WASH AND ROTATE DOWN 4700'-5171' AT 40 RPM TO TEST FUNCTIONALITY OF TOP DRIVE AFTER REPAIR.NO ISSUES OBSERVED. -100 GPM,250 PSI,40 RPM. -PU 155K,SO 153K,ROT WT 153K. 10:30 - 11:30 1.00 DRILL P INTI FUNCTION TEST BOPE -PJSM. SUCK OUT BOPE STACK. -CONDUCT WEEKLY BOPE FUNCTION TEST -WITH THE EXCEPTION OF THE BLIND RAMS. 11:30 - 12:00 0.50 DRILL P INTI RIH ON ELEVATORS -PJSM FOR RUNNING IN HOLE. ORIENT MOTOR TO 45 DEGREES RIGHT,450 GPM,1250 PSI. -SHUT PUMPS DOWN. -RIH ON ELEVATORS F/5,269'T/5,364'. *5 BBLS 9.5 PPG LSND FOR TOUR. 12:00 - 14:00 2.00 DRILL P INTI MAKE CHECK SHOT -PJSM FOR RUNNING IN HOLE,HELD DURING PRE-TOUR. -RIH ON ELEVATORS F/5,364'T/5,425'. -MU TOP DRIVE,600 GPM,2200 PSI. -RE-SURVEY AT 5,425'AND 5,457',SURVEYS STILL SUSPECT,USE INTERPOLATED VALUES AT THOSE TWO DEPTHS. -RIH ON ELEVATORS F/5,457'T/6,251'. 14:00 - 00.00 10.00 DRILL P INTI WASH TO BOTTOM AND DRILL -WASH DOWN F/6,251'T/6,291'. -450 GPM,1440 PSI,STAGE UP TO 500 GPM, 1720 PSI. -80 RPM,TQ OFF 2-3K DRILL 8-1/2"INTERMEDIATE HOLE F/6,291'T/ 7,105'MD(6,950'TVD) -600 GPM,2,620 PSI ON,2,380 PSI OFF. -80 RPM,3-5K TQ ON,2-3K TQ OFF. -PU 185K,SO 175K,ROT 175K,5-18K WOB. -ECD:ACTUAL=10.15 PPG,CALC=9.98 PPG. -SURVEY EVERY-90'. -ART=3.5 HRS. -AST=1.39 HRS. -JAR HRS=14.88 HRS. -MW=9.5 PPG IN/OUT. * BBLS OF 9.5 PPG LSND LOST DURING TOUR. Printed 3/24/2015 2:36'10PM • North America-ALASKA-BP • Page 33 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:OOAM Rig Release: Rig Contractor DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/24/2015 00:00 - 06:30 6.50 DRILL P INTI DRILL 8-1/2"INTERMEDIATE HOLE F/7,105'T/ 7,489'MD(7,306'TVD) -595 GPM,3,000 PSI ON,2,800 PSI OFF. -100 RPM,4-6K TQ ON,3K TO OFF. PU 186K,SO 174K,ROT 178K,9-20K WOB. ECD:ACTUAL=10.1 PPG,CALC=10.1 PPG. -SURVEY EVERY-90'. ART=2.96 FIRS. -AST=0.78 HRS. -JAR HRS=18.62 HRS. MW IN 10.2 PPG,MW OUT 10.2 PPG. *USE 12.7 PPG SPIKE FLUID TO BRING MUD SYSTEM FROM 9.5 PPG TO 10.2 PPG IN TWO SURFACE TO SURFACE CIRCULATIONS. 06:30 - 07:00 0.50 DRILL P INTI RIG SERVICE -HOLD SPILL DRILL. 07:00 09:30 2.50 DRILL N RREP 7,489.00 INTI TROUBLE SHOOT TOP DRIVE,INTERMITTENT • LOSS OF ROTATION 09:30 - 11:00 1.50 DRILL N RREP 7,489.00 INTI POOH -MONITOR WELL FOR 10 MINUTES,STATIC. j-MUD WEIGHT:10.2 PPG IN,10.2 PPG OUT POOH ON ELEVATORS FROM 7,489'MD TO .4,636'MD -PU 155K,SO 153K AT 4,636'MD *D1 DRILL,CRT 2 MIN,20 SEC. 11:00 - 12:00 1.00 DRILL N RREP 7,489.00 INTI 1 TROUBLE SHOOT TOP DRIVE,INTERMITTENT LOSS OF ROTATION -MONITOR WELL ON TRIP TANK. *16 BBLS OF 10.2 LSND LOSS FOR TOUR. 12:00 - 12:30 0.50 DRILL P - INTI RIG SERVICE 12:30 - 18:00 5.50 DRILL N RREP 7,489.00 INTI TROUBLE SHOOT TOP DRIVE,INTERMITTENT LOSS OF ROTATION '-REPLACE HYDRAULIC SYSTEM ACCUMULATOR. -INCREASE SPAN ON ALARM PRESSURE FOR LUBE OIL PRESSURE SWITCH. -RING OUT SPARE CONDUCTORS IN SERVICE LOOP TO VERIFY CONDUCTIVITY. -WIRE ALARM SWITCH TO SPARE CONDUCTORS. -FUNCTION TEST TOP DRIVE,GOOD TEST. i*CLEAN SUCTION POTS ON MUD PUMPS 18:00 - 21:30 3.50 DRILL N RREP 7,489.00 INTI j RIH -RIH WITH 8-1/2"DRILLING BHA F/4,636'T/ 7,295'. -PROCEED SLOWLY THROUGH WINDOW WITH BHA F/5,326'T/5,301'. 21:30 - 23:00 1.50 DRILL N RREP 7,489.00 • INT1 CIRCULATE BUS 1.5X'S • -MU TOP DRIVE,WASH DOWN F/7,295'T/ • 7,485' -450 GPM,1900 PSI -100 RPM,3K TQ CONDITION MUD AND VERIFY 10.2 PPG IN AND OUT. Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP • Page 34 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:00 - 00:00 1.00 DRILL P INTI DRILL 8-1/2"INTERMEDIATE HOLE F/7,489'T/ 7,518'MD(7,322'TVD) -600 GPM,2,960 PSI ON,2,920 PSI OFF. -100 RPM,4-6K TQ ON,3K TQ OFF. -PU 193K,SO 175K,ROT 175K,8-10K WOB. -ECD:ACTUAL=10.7 PPG,CALC=10.1 PPG. -SURVEY EVERY-90'. ART=0.43 HRS. AST=0.12 HRS. JAR HRS=19.17 HRS. -MW IN 10.2 PPG,MW OUT 10.2 PPG. *7 BBLS OF 10.2 LSND LOSS FOR TOUR. 2/25/2015 00:00 - 03:30 3.50 DRILL N RREP 7,518.00 INTI OBSERVE VALVE NOISE IN MUD PUMP#1 -SHUT DOWN AND LOCK OUT MP#1. -LINE UP TO CIRCULATE ON MP#2. -REMOVE VALVE CAPS FROM SUSPECT FLUID END,TROUBLE SHOOT. NUMBER 2 FLUID END ON MP#1 PRESSURE CUT BEHIND VALVE SEAT. -UNABLE TO REPAIR PUMP WITHOUT REPLACING FLUID END. -CBU 3X'S,ADD 2 EACH 5 GALLON PALES OF -BIO-CIDE TO TREAT MUD. -300 GPM,995 PSI. -PU 193K,SO 175K,ROT 175K. *CONTACT DRLG.SUPT.AND ADVISE WSL WOULD LIKE TO PULL TO VNNDOW. *ESTIMATED TIME FOR REPAIR 24 HOURS. *HOLD PJSM AND COMPLETE HAZARD RECOGNITION WORKSHEET. 03:30 - 05:00 1.50 DRILL N RREP 7,518.00 INTI POOH -MONITOR WELL FOR 10 MINUTES,STATIC. -MUD WEIGHT 10.2 PPG IN,10.2 PPG OUT. -PUMP DRY JOB. -POOH ON ELEVATORS FROM 7,518'MD TO 5,203"MD. -PU 170K,SO 155KAT 6,065'MD. 05:00 - 10:30 5.50 DRILL N RREP 7,518.00 INTI DISASSEMBLE MUD PUMP#1 -DEVELOP HAZARD WORKSHEET,DISCUSS ALL HAZARDS INVOLVED,AND INSTALL LOCKS PER LOTO SOP. -CONFIRM THAT THE MUD PUMP WAS PROPERLY LOTO BY ATTEMPTING TO FUNCTION. -START TO DISASSEMBLE#2 FLUID END MODULE ON#1 MUD PUMP. -MONITOR WELL ON TRIP TANK. 10:30 - 11:00 0.50 DRILL P INTI RIG SERVICE 11:00 - 12:00 1.00 DRILL N RREP 7,518.00 INTI DISASSEMBLE MUD PUMP#1 -CONTINUE TO DISASSEMBLE#2 FLUID END MODULE ON#1 MUD PUMP. -MONITOR WELL ON TRIP TANK. *5 BBLS OF 10.2 LSND LOSS FOR TOUR. 12:00 - 12:30 0.50 DRILL P INTI RIG SERVICE Printed 3/24/2015 2:36:10PM North America-ALASKA-BP • Page 35 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: 1X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:30 - 14:00 1.50 DRILL N RREP 7,518.00 INTI DISASSEMBLE MUD PUMP#1 •-COMPLETE DISASSEMBLE#2 FLUID END MODULE ON#1 MUD PUMP. REMOVE#2 FLUID END MODULE FROM PUMP ROOM. -PLACE NEW FLUID END MODULE FOR#1 MUD PUMP IN PUMP ROOM. INSTALL LIGHT IN DERRICK WHILE j PERFORMING MUD PUMP REPAIRS. MONITOR WELL ON TRIP TANK. 14:00 16:00 2.00 DRILL N RREP 7,518.00 INTI INSTALL NEW#2 FLUID END MODULE ON#1 MUD PUMP -CLEAN NEW#2 FLUID END MODULE. -DRESS STUDS AND BOLTS. MONITOR WELL ON TRIP TANK. 16:00 - 18:00 2.00 DRILL N RREP 7,518.00 INTI INSTALL NEW#2 FLUID END MODULE ON#1 MUD PUMP -INSTALL WEAR PLATE. -LIFT FLUID ENO INTO POSITION. -MONITOR WELL ON TRIP TANK. 18:00 20:00 2.00 DRILL N RREP 7,518.00 INTI INSTALL NEW#2 FLUID END MODULE ON#1 MUD PUMP -REPOSITION FLUID END. MONITOR WELL ON TRIP TANK. 20:00 - 00:00 4.00 DRILL N RREP 7,518.00 INTI INSTALL NEW#2 FLUID END MODULE ON#1 MUD PUMP -REPOSITION FLUID END DUE TO WEAR PLATE COUNTER BORE BEING 1/8 INCH HIGH RESULTING IN INTERFERENCE BETWEEN WEAR PLATE AND PUMP FRAME. -MONITOR WELL ON TRIP TANK. '5.5 BBLS OF 10.2 LSND LOSS FOR TOUR. 2/26/2015 00:00 - 00:30 0.50 DRILL •P INTI SERVICE AND INSPECT TOP DRIVE,BLOCKS, AND DRAWWORKS. 00:30 - 12:00 11.50 DRILL N RREP 7,518.00 INTI INSTALL NEW#2 FLUID END MODULE ON#1 MUD PUMP -COMPLETE INSTALLING NEW#2 FLUID END MODULE ON#1 MUD PUMP. -INSTALL AND BOLT UP MUD PUMP DISCHARGE MANIFOLD. -MONITOR WELL ON TRIP TANK. MISC OPERATIONS WHILE COMPLETING MUD PUMP FLUID END CHANGE OUT -CLEAR MISC TOOLS FROM RIG FLOOR AREA NOT NEEDED FOR UPCOMING OPERATIONS. -HELD SPILL DRILL. CRT 1:50. -REMOVE 4"FOSV FROM DRILL PIPE AND M/U TOP DRIVE. -BREAK CIRCULATION AND TEST RUN#1 MUD PUMP AT 320 GPM,980 PSI FOR 5 MIN. GOOD TEST. 4 BBLS OF 10.2 LSND LOSS FOR TOUR. Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP • Page 36 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: 'X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 13:00 1.00 DRILL N RREP 7,518.00 INTI PRESURE TEST#1 MUD PUMP AFTER FLUID I END CHANGE OUT -PJSM -PRESSURE TEST#1 MUD PUMP TO 3600 PSI AND CHECK FOR LEAKS. NO LEAKS. -BLEED OFF PRESSURE AND LINE UP MUD PUMP FOR NORMAL DRILLING OPERATIONS. 13:00 - 13:30 0.50 DRILL P 7,518.00 INTI RIG SERVICE. 13:30 - 16:00 2.50 DRILL N RREP 7,518.00• INTI 'TOP DRIVE REPAIRS -PJSM -DOYON MECHANIC AND NOV TECHNICIAN INSPECT TOP DRIVE. -NOV TECHNICIAN CHANGE OUT PLC HYDRAULIC CARTRIDGE AND REPLACE DIGITAL OUTPUT MODULE. 16:00 - 18:00 2.00 DRILL N RREP 7,518.00 INTI RtH WITH 8 1/2"DRILLING BHAAFTER#1 MUD PUMP REPAIRS -RIH ON THE ELEVATORS WITH THE 8 1/2" DRILLING BHA FROM 5206'TO 7390'. -HOLE SLICK WITH NO TIGHT SPOTS. P/U 190K,S/0 140K. 18:00 - 19:30 1.50 DRILL P INTI BREAK CIRCULATION AND STAGE UP PUMP RATE. WASH/REAM FROM 7390'MD TO 7485' -MD -BREAK CIRCULATION AND STAGE PUMP RATE UP AS PER THE FOLLOWING. -200 GPM,1080 PSI AT 40 RPM ROTARY WITH 3-4K TORQUE. -400 GPM,1640 PSI AT 40 RPM ROTARY WITH 3-4K TORQUE. -450 GPM,1990 PSI AT 40 RPM ROTARY WITH 3-4K TORQUE. -WASH/REAM FROM 7390'MD TO 7485'MD. -HOLE SLICK WITH NO TIGHT SPOTS. -INCREASE PUMP RATE TO 600 GPM,3000 PSI ON THE UP STROKE WHILE RECIPROCATING DRILL STRING. -DECREASE PUMP RATE TO 450 GPM,1990 PSI ON THE DOWN STROKE WHILE RECIPROCATING DRILL STRING. -FINSH CIRCULATING 1.5 BOTTOMS UP WHILE RECIPROCATING THE DRILL STRING 90'. I-BASE LINE ECD=10.66. -MW IN/OUT 10.2-10.2 WITH CORRECT PROPERTIES. Printed 3/24/2015 2.36:10PM North America-ALASKA-BP S Page 37 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:OOAM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.7Ousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:30 00:00 4.50 DRILL P INTI DRILL 8 1/2"INTERMEDIATE SECTION -FINISH WASH/REAM FROM 7485 TO 7518' MD AT 450 GPM,1990 PSI,AT 40 RPM,WITH 3-4K TORQUE. 1-DRILLING 8 1/2"INTERMEDIATE SECTION FROM 7518'MD TO 7674'MD/7474'TVD WITH FOLLOWING PARAMETERS. -600 GPM,3210 PSI ON BOTTOM/3090 PSI OFF BOTTOM. -100 RPM,5-6K TORQUE ON BOTTOM/3-4K OFF BOTTOM. -P/U 195K,S/O 175K,ROT 175K,WOB 10-15K. -ECD:ACTUAL 10.7,CALCULATED 10.66. -SURVEY EVERY 90'. -ACTUAL ROTATE TIME=1 HR. -ACTUAL SLIDE TIME=2.02 HRS. -JARS TIME=22.2 HRS. -TOTAL DRILL HRS=3.02 HRS. -MUD WEIGHT 10.2 IN/OUT. -PUMP HIGH VIS SWEEP AT 7576'MD - 35% INCREASE IN CUTTINGS. -PENETRATE CM2 ZONE AT 7621'MD. *5 BBLS OF 10.2 LSND LOSS FOR TOUR. *TAKE SLOW PUMP RATES. 2/27/2015 00:00 - 12:00 12.00 DRILL P INTI DRILL 8 1/2"INTERMEDIATE SECTION -DRILLING 8 1/2"INTERMEDIATE SECTION FROM 7674'MD TO 8149'MD/7918'TVD WITH FOLLOWING PARAMETERS. -598 GPM,3350 PSI ON BOTTOM/3160 PSI OFF BOTTOM. -40 RPM,5-6K TORQUE ON BOTTOM/4-5K OFF BOTTOM. -P/U 205K,S/O 181K,ROT 185K,WOB 10-15K. -ECD:ACTUAL 10.7,CALCULATED 10.68. -SURVEY EVERY 90'. -ACTUAL ROTATE TIME=3.40 HRS. -ACTUAL SLIDE TIME=3.22 HRS. -JARS TIME=28.82 HRS. -MUD WEIGHT 10.2 IN/OUT. *TAKE SLOW PUMP RATES. *12 BBLS OF 10.2 LSND LOSS FOR TOUR. *WSL PERFORM SPCC WALK THROUGH WITH SPILL CHAMPION. Printed 3/24/2015 2:36:10PM S North America-ALASKA-BP • • Page 38 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UW:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date i From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 00:00 12.00 DRILL P INTI DRILL 8 1/2"INTERMEDIATE SECTION DRILLING 8 1/2"INTERMEDIATE SECTION FROM 8149'MD TO 8494'MD/8167'TVD WITH FOLLOWING PARAMETERS. -600 GPM,3450 PSI ON BOTTOM/3270 PSI OFF BOTTOM. -40 RPM,5-6K TORQUE ON BOTTOM/2-3K OFF BOTTOM. -P/U 210K,S/O 183K,ROT 190K,WOB 5K -ECD:ACTUAL 10.50,CALCULATED 10.67. -SURVEY EVERY 90'. -ACTUAL ROTATE TIME=3.75 HRS. -ACTUAL SLIDE TIME=3.77 HRS. -JARS TIME=37.30 HRS. -MUD WEIGHT 10.2 IN/OUT. *TAKE SLOW PUMP RATES. *0 BBLS OF 10.2 LSND LOSS FOR TOUR. *PENETRATE CM1 ZONE AT 8360'MD/8107' TVD. 2/28/2015 00:00 - 06:00 6.00 DRILL P INTI DRILL 8 1/2"INTERMEDIATE SECTION. DRILLING 8 1/2"INTERMEDIATE SECTION FROM 8449'MD TO 8600'MD/8329'TVD WITH THE FOLLOWING PARAMETERS. -550 GPM 3100 PSI ON BOTTOM/2990 PSI OFF BOTTOM. -65 RPM,4K TORQUE ON BOTTOM,10K OFF BOTTOM. -P/U 212K,S/O 185K,ROT 192K,WOB 7K -ECD:ACTUAL 10.54,CALCULATED 10.65. -SURVEY EVERY 90'. -MUD WEIGHT 10.2 IN/OUT. -HELD KICK DRLL WHILE DRILLING DRILL WITH CRT OF 02:35. 06:00 12:00 6.00 DRILL P INTI DRILL 8 1/2"INTERMEDIATE SECTION. -DRILLING 8 1/2"INTERMEDIATE SECTION FROM 8600'MD TO 8749'MD/8463'TVD WITH THE FOLLOWING PARAMETERS. -550 GPM 3200 PSI ON BOTTOM/2900 PSI OFF BOTTOM. -40 RPM,6-8K TORQUE ON BOTTOM,4K OFF BOTTOM. -P/U 216K,5/0 188K,ROT 198K,WOB 7K -ECD:ACTUAL 10.54,CALCULATED 10.65. -SURVEY EVERY 90'. -ACTUAL ROTATE TIME=1.41 HRS. -ACTUAL SLIDE TIME=5.41 HRS. -JAR TIME=44.32. -MUD WEIGHT 10.2 IN/OUT. *24 HOUR NOTIFICATION MADE TO AOGCC OF INTENT TO TEST BOPE @ 09:26. *OBTAIN SPR'S @ 8525'MD,8260 TVD WITH 10.2 PPG MW. *5 BBLS OF 10.2 LSND LOSS FOR TOUR. Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP S page 39 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-O:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:OOAM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 18:00 6.00 DRILL P INTI DRILL 8 1/2"INTERMEDIATE SECTION. DRILLING 8 1/2"INTERMEDIATE SECTION FROM 8749'MD TO 8877'MD/8574'TVD WITH THE FOLLOWING PARAMETERS. -550 GPM 3200 PSI ON BOTTOM/2900 PSI OFF BOTTOM. -40 RPM,6-8K TORQUE ON BOTTOM,4K OFF BOTTOM. -P/U 216K,S/O 188K,ROT 198K,WOB 7K. -ECD:ACTUAL 10.54,CALCULATED 10.65. -SURVEY EVERY 95'. -ACTUAL ROTATE TIME=.22 HRS. -ACTUAL SLIDE TIME=3.52 HRS. -JAR TIME=48.06. -MUD WEIGHT:10.2 PPG IN/OUT. *OBTAIN SPR'S @ 8,814'MD,8,521 TVD WITH 10.2 PPG MW. *0 BBLS OF 10.2 LSND LOSS FOR TOUR. 18:00 - 19:30 1.50 DRILL N WAIT 8,876.98 INTI 'PHASE 3 CONDITION ANNOUNCED. CIRCULATE CBU @ 8,877'@ 600 GPM @ 2980 PSI ROTATING AND RECIPROCATING PIPE. PU=210K,SOW=185K. 19:30 - 20:30 1.00 DRILL N WAIT 8,876.98 INTI 'PJSM ON PHASE 3 CONDITION AND POSITION THE PIPE TO WAIT IT OUT. LAY DOWN 15 JOINTS OF DRILL PIPE TO POSITION DRILL STRING OUT OF HRZAND TO KEEP FROM DROPPING INCLINATION AND AZMUTH WHILE CIRCULATING. 20:30 - 00:00 3.50 DRILL N WAIT 8,876.98 INTI PHASE 3 CONDITIONS:ORIENTATE BIT HIGH SIDE ON MOTOR.CIRCULATE 420 GPM CBU 3 X HOLE CLEAN. ADJUST PUMP RATE TO 400 GPM TO KEEP BATTERY LIFE AVAILABLE ON MWD. 3/1/2015 00:00 - 16:30 16.50 DRILL N WAIT 8,876.98 INTI RECIPROCATE DRILL STRING IN THE CM1 WHILE WAITING ON WEATHER. -PHASE 3 CONDITIONS,RECIPROCATE DRILL STRING F/8,433'T/8,339'WITH BIT ORIENTATED HIGH SIDE OF MUD MOTOR PUMPING @ 420 GPM WITH 2120 PSI. PERFORM SPCC WALKAROUNDS UTILIZING THE BUDDY SYSTEM TO ENSURE THAT ALL EQUIPMENT IS IN GOOD RUNNING CONDITION AND NO PROBLEMS OCCUR. -PERFORM CREW CHANGE WITH IMT APPROVAL WITH ALL PERSONNEL ON LOCATION AT 14:00 HOURS WITH ESCORT 'FROM RIG CAMP LOADER. *OA PRESSURE REMAINS AT ZERO. *ZERO LOSSES FROM MIDNIGHT TO NOON TO WELL. *PHASE 3 CONDITIONS LIFTED AT 16:30 HOURS TO PHASE 1. Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP • page 40 at 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16.30 - 19:30 3.00 DRILL P INTI POOH INTO 9-5/8"CASING THROUGH WINDOW TO CONDUCT BOPE TEST. -PJSM,SHUT DOWN PUMPS AND MONITOR WELL,WELL STATIC. -BREAK OUT TOP DRIVE AND STAND BACK ONE STAND OF 4"DRILL PIPE. -BLOW DOWN TOP DRIVE. POOH ON ELEVATORS F/8,339'T/5,016' MONITORING HOLE FILL ON TRIP TANK, CORRECT DISPLACEMENT AND CAPACITY OBTAINED WITH VOLUMES ACCOUNTED FOR 1 IN TRIP TANK AND ROCK WASHER WITH PIPE PULLING WET. PUW 150K,SOW 150K. *TRIP OUT OF HOLE LOOKED GOOD WITH NO SIGNIFICANT OVERPULLS OBSERVED. 19:30 20:00 0.50 DRILL P INTI CLEAN RIG FLOOR AREA -M/U TOP DRIVE. -REMOVE WIPER RUBBER OFF DRILL PIPE. -CLEAN AND CLEAR RIG FLOOR. *HELD FIRE DRILL. CRT 1:20. 20:00 - 22:00 2.00 DRILL P INTI SLIP/CUT DRILL LINE PJSM. SLP/CUT 59 1/2'DRILL LINE. SERVICE AND INSPECT TOP DRIVE, BLOCKS,DRAWWORKS,AND CALIBRATE BLOCK HEIGHT. -RE-SET COM,FUNCTION AND CONFIRM SET PROPERLY. 22.00 - 23:00 1.00 BOPSUR P INTI M/U WEAR RING TOOL ASSEMBLY -BRING FMC 13"SPRING LOAD WEAR RING ASSEMBLY UP THE BEAVER SLIDE TO THE RIG FLOOR. M/U FMC 13"SPRING LOADED WEAR RING PULLING TOOL ASSEMBLY TO SINGLE JOINT OF 4"DRILL PIPE. 23:00 - 00:00 1.00 BOPSUR P INTI PULL FMC WEAR RING PJSM. -M/U FMC 13"SPRING LOADED WEAR RING PULLING TOOL ASSEMBLY TO THE DRILL STRING. -DRAIN DRILLING FLUID OUT OF BOPE. -RINSE BOPE WITH WATER. ATTEMPT#1 RIH AND ENGAGE WEAR RING FMC 13" SPRING LOADED WEAR RING PULLING TOOL. -POOH WITH THE FMC WEAR RING. NO SUCCESS. WEAR RING WAS NOT ON THE WEAR RING PULLING TOOL. -3 OF 4 OF THE SPRING LOADED DOGS ON THE WEAR RING PULLING TOOL HAD WEAR MARKS INDICATING THE PULLING TOOL HAD ENGAGED THE WEAR RING. *8 BBLS OF 10.2 LSND LOSS FOR TOUR. Printed 3/24/2015 2:36:10PM 4,0„114t; '"glAfAiAle451443AfferP.'",%/C"-"NiA«,%'44eifinKEizt,v4,M.,40,0,,,e,ttxR30.(ow/seffrge, .f Operation Summary Report'fes Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C•(9,794,732.00) Project.Prudhoe Bay Site:PB DS 09 Rig Name/No..DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor.DOYON DRILLING INC. UWI.500292020900 Active datum.09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/2/2015 00:00 - 01:30 1.50 BOPSUR P INTI PULLING WEAR RING ATTEMPT#2 RIH WITH FMC 13"SPRING LOADED WEAR RING PULING TOOL. -POOH WITH THE FMC WEAR RING. NO SUCCESS. -4 OF 4 OF THE SPRING LOADED DOGS ON THE WEAR RING PULLING TOOL HAD WEAR MARKS INDICATING THE PULLING TOOL HAD ,ENGAGED THE WEAR RING. ATTEMPT#3 RIH WITH FMC 13"SPRING LOADED WEAR 1 RING PULING TOOL AND STOP 1 FOOT ABOVE WEAR RING. -TURN WEAR RING PULLING TOOL ASSEMBLY 1/4 TURN RIGHT. f-ENGAGE WEAR RING. -POOH WITH THE FMC WEAR RING. NO SUCCESS. -THE SPRING LOADED DOGS ON THE WEAR RING PULLING TOOL HAD SLIGHTLY LARGER WEAR MARKS INDICATING THE PULLING TOOL HAD ENGAGED THE WEAR RING. ATTEMPT#4 -RIH WITH FMC 13"SPRING LOADED WEAR RING PULING TOOL. ENGAGE WEAR RING. -POOH WITH THE FMC WEAR RING. NO SUCCESS. -THE SPRING LOADED DOGS ON THE WEAR RING PULLING TOOL HAD SLIGHTLY LARGER WEAR MARKS INDICATING THE PULLING TOOL HAD ENGAGED THE WEAR RING. ATTEMPT#5 -RIH WITH FMC 13"SPRING LOADED WEAR RING PULING TOOL AND STOP 1 FOOT ABOVE WEAR RING. -TURN WEAR RING PULLING TOOL ASSEMBLY 1/2 TURN RIGHT. -ENGAGE WEAR RING. -POOH WITH THE FMC WEAR RING. WEAR RING WAS ON THE WEAR RING PULLING TOOL. -L/D WEAR RING AND WEAR RING PULLING TOOL ASSEMBLY. -PJSM,STRIP IN TEST PLUG. 01:30 - 03:30 2.00 BOPSUR P INTI RIG UP TEST EQUIPMENT FOR TESTING BOPE AND PERFORM SHELL TEST. -PJSM AND REVIEW DDI SOP. -INSTALL 4"TEST JOINT INTO TEST PLUG AND FILL MUD LEG WITH 6 BBLS. -PERFORM SHELL TEST OF BOPE STACK Printed 3/24/2015 2:36:10PM Operation Summary Reports Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C•(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:OOAM Rig Release: Rig Contractor DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:30 - 10:30 7.00 BOPSUR P INTI TEST BOPE - PJSM,TESTING BOPE. -REVIEW PRESSURE CROSS CHECK LIST. TEST PRESSURES 250/3500 PSI FOR 5 MIN EACH TEST CHARTED FOR ALL EQUIPMENT. -TEST 7"FIXED RAMS WITH 7"TEST JOINT, TEST 3-1/2"X 6"VBRs WITH 4"AND 4-1/2" TEST JOINTS,TEST ANNULAR PREVENTER WITH 4"TEST JOINT.TEST 2 XT39 FOSV'S AND 1 XT39 DART VALVE,TEST 4-1/2"IF FOSV,UPPER IBOP AND LOWER!BOP ON TOP DRIVE AND ALL VALVES ON CHOKE MANIFOLD AND MUD CROSS ALONG WITH KILL VALVE IN PITS. -PERFORM SUCCESSFUL DRAW DOWN TEST OF THE ACCUMULATOR SYSTEM. *PERFORM TRIP DRILL. CRT 1:35. *AOGCC JEFF JONES WAIVED RIGHT TO WITNESS. '*TEST ALL RIG GAS ALARMS. 10:30 - 12:00 1.50 BOPSUR P INTI RIG DOWN TEST EQUIPMENT. -PJSM AND BLOW DOWN CHOKE AND KILL LINES ALONG WITH CHOKE MANIFOLD. COMPLETE DERRICK INSPECTION WITH WSL CONFIRMATION OF DOCUMENTATION. *RE-TORQUE ALL BOLTS FOR PREVIOUS FLUID END INSTALLED ON MUD PUMP#1. ALL BOLTS GOOD. *ZERO LOSSES TO WELL FROM MIDNIGHT TO NOON. 12:00 13:30 1.50 BOPSUR P INTI REMOVE TEST PLUG AND INSTALL WEAR RING. -PJSM WITH FMC ON STRIPPING OUT TEST PLUG AND STRIPPING IN WEAR RING AND REVIEW FMC SOP. PICK UP JOINT OF XT39 AND MAKE UP TO TEST PLUG. -PULL TEST PLUG FREE FROM TUBING SPOOL WITH 150K UP WEIGHT AND BRING TO FLOOR. -REMOVE TEST PLUG AND MAKE UP SPRING LOADED WEAR RING PULLING TOOL TO STRING WITH WEAR RING AND LAND IN TUBING SPOOL. -FMC RILDS AND TORQUE GLAND NUTS TO 450 FT/LBS. -RELEASE FROM WEAR RING AS DIRECTED FROM FMC AND PULL RETRIEVING TOOL TO RIG FLOOR. -BREAK OUT AND LAY DOWN RETRIEVING TOOL AND MAKE UP SAFETY JOINT WITH XT39 FOSV. *WEAR RING ID IS 9". Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP r Page 43 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161 V-C:(9.794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:30 - 14:00 0.50 BOPSUR P INTI INSPECT TOP DRIVE SAVER SUB. -PJSM AND REVIEW SABER SUB INSPECTION CRITERIA. -OPEN GRABBER BOX ON TOP DRIVE AND SECURE OUT OF WAY. I-CLEAN THREADS AND SEALING SHOULDER AND CONFIRM SAVER SUB GOOD. CONFIRM GRABBER DIES GOOD WITH ALL SECURING DEVICES INTACT. 14:00 - 15:00 1.00 BOPSUR P INTI NOV TECHNICIAN AND DDI MECHANIC PERFORM SURFACE CHECK ON TOP DRIVE. -PJSM AND ADJUST PRESSURE SWITCH FOR LUBE OIL TO 10 PSI. -NOV TECHNICIAN SET COUNTERBALANCE AND STAND JUMP ON TOP DRIVE. *SIMOPS FLOOR HANDS HOLD PJSM AND REVIEW BEAVER SLIDE OPERATIONS. REMOVE SPECIALTY WELLHEAD TOOLS FROM RIG FLOOR VIA THE BEAVER SLIDE. 15:00 - 17:00 2.00 DRILL P INTI RIH WITH 8-1/2"INTERMEDIATE DRILLING ASSEMBLY. PJSM,RIH FROM 5,016'TO 8,460'. -PUW 205K,SOW 180K. 17:00 - 17:30 ! 0.50 DRILL P INTI P/U SINGLES AND CONTINUE TO RIH WITH DRILL PIPE THAT WAS LAYED DOWN DURING RECENT BLOW. -P/U SINGLES FROM PIPE SHED FROM 8,460' TO 8,814'. -PUW 210K,SOW 185K. 17:30 - 20:30 3.00 DRILL P INTI DRILL 8 1/2"INTERMEDIATE HOLE LOOKING FOR 7"CASING POINT FROM 8,877'MD TO !8,954'MD(8,638'ND) -MAKE UP TOP DRIVE AND OBTAIN PARAMETERS. -PUW 210K,SOW 185K,RTW 195K. !-WASH DOWN F/8,814'T/8,877'AND TAG BOTTOM AT 8,877'. -DRILL AHEAD AS PER DIRECTIONAL PLAN F/ 8,877'T/8,954'. 550 GPM, 3340 PSI ON. -WOB8-11K. -40 RPM,5K TORQUE ON -PU 210K,SO 185K,ROT 195K -ACTUAL ROTATE TIME=1 HRS -ACTUAL SLIDE TIME=0 HRS -MUD WEIGHT:10.2 PPG IN,10.2 PPG OUT -INCREASE ROP FROM 77 FPH TO 180 FPH 8,950'. 20:30 - 21:30 1.00 DRILL P INTI CIRCULATE BOTTOMS-UP AT 8,954'MD FOR BU SAMPLE. -550 GPM,3110 PSI -40 RPM,5-8K TORQUE -RECIPROCATE-60'. -NO TSAD SAND IN SAMPLE. Printed 3/24/2015 2.36:10PM North America-ALASKA-BP 110 Page 44 of 70 • Operation Summary Report Common Well Name 09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161 V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:30 - 22:00 0.50 DRILL P INTI DRILL 8 1/2"INTERMEDIATE HOLE LOOKING FOR 7"CASING POINT FROM 8,954'MD TO 8,975'MD(8,655'TVD) -550 GPM, 3250 PSI ON. WOB 8-11K. -40 RPM,5K TORQUE ON -PU 210K,SO 185K,ROT 195K -ACTUAL ROTATE TIME=0.5 HRS -ACTUAL SLIDE TIME=0 HRS MUD WEIGHT:10.2 PPG IN,10.2 PPG OUT -INCREASE ROP FROM 180 FPH TO 200 FPH. *RIG GEOLOGIST DISCUSS DRILLING ROP PARAMETERS WITH ANCHORAGE GEOLOGIST. DECISION MADE TO DRILL AHEAD LOOKING FOR CASING IN SMALLER FOOTAGE INCREMENTS. *WSL DISCUSS FORWARD PLAN WITH OPERATIONS DRILLING ENGINEER. DRILLING ENGINEER OK WITH FORWARD PLAN. 22:00 - 22:30 0.50 DRILL P INTI CIRCULATE BOTTOMS-UP AT 8,975'MD FOR -SAMPLE. -550 GPM,3110 PSI -40 RPM,5-8K TORQUE ;-RECIPROCATE—60'. -NO TSAD SAND IN SAMPLE. 22:30 - 23:00 0.50 DRILL P INTI DRILL 8 1/2"INTERMEDIATE HOLE LOOKING FOR 7"CASING POINT FROM 8,975'MD TO 8,985'MD(8,664'TVD) -550 GPM, 3250 PSI ON. WOB 8-11K. -40 RPM,5-6K TORQUE ON -PU 210K,SO 185K,ROT 195K -ACTUAL ROTATE TIME=0.5 HRS -ACTUAL SLIDE TIME=0 HRS -MUD WEIGHT:10.2 PPG IN,10.2 PPG OUT -ROP STEADY AT 200 FPH. 23:00 - 23.30 0.50 DRILL P INTI CIRCULATE BOTTOMS-UP AT 8,985'MD FOR SAMPLES -550 GPM,3110 PSI -40 RPM,5-8K TORQUE -RECIPROCATE-60'. -NO TSAD SAND IN SAMPLE. Printed 3/24/2015 2.36:10PM • North America-ALASKA-BP • Page 45 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 - —' Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UW:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:30 - 00:00 0.50 DRILL P INTI DRILL 8 1/2"INTERMEDIATE HOLE LOOKING FOR 7"CASING POINT FROM 8,985'MD TO 8,995'MD(8672'TVD) -550 GPM, 3200 PSI ON. -WOB8-11K. -40 RPM,5-6K TORQUE ON PU 210K,SO 185K,ROT 195K ACTUAL ROTATE TIME=0.5 HRS -ACTUAL SLIDE TIME=0 HRS MUD WEIGHT:10.2 PPG IN,10.2 PPG OUT ROP 200 FPH TO 250 FPH. CIRCULATE BOTTOMS-UP AT 8,995'MD FOR SAMPLE. -550 GPM,3110 PSI -40 RPM,5-8K TORQUE -RECIPROCATE-60'. NO TSAD SAND IN SAMPLE. 3/3/2015 00:00 - 01:00 1.00 DRILL P INTI DRILL 8 1/2"INTERMEDIATE HOLE LOOKING FOR 7"CASING POINT FROM 8,995'MD TO 9,000'MD(8,677'TVD) -550 GPM. 3200 PSI ON. -WOB 8-11K. -40 RPM,5-6K TORQUE ON. PUW 210K,SOW 185K,ROT 195K. -ACTUAL ROTATE TIME=0.5 HRS. -ACTUAL SLIDE TIME=0 HRS. MUD WEIGHT:10.2 PPG IN,10.2 PPG OUT. -ROP 200 FPH TO 125 FPH. CIRCULATE BOTTOMS-UP AT 9,000'MD FOR SAMPLE. -550 GPM,3110 PSI. 40 RPM,5-8K TORQUE. RECIPROCATE-60'. -NO TSAD SAND IN SAMPLE. 01:00 - 02:00 1.00 DRILL P INTI DRILL 8 1/2"INTERMEDIATE HOLE LOOKING FOR 7"CASING POINT FROM 9,000'MD TO 9,005'MD(8,681'TVD) 550 GPM, 3200 PSI ON. -WOB 8-11K. -40 RPM,5-6K TORQUE ON PUW 210K,SOW 185K,ROT 195K -ACTUAL ROTATE TIME=0.5 HRS 1-ACTUAL SLIDE TIME=0 HRS -MUD WEIGHT:10.2 PPG IN,10.2 PPG OUT -ROP 125 FPH. CIRCULATE BOTTOMS-UP AT 9,005'MD FOR SAMPLE. -550 GPM,3110 PSI. -40 RPM,5-8K TORQUE. I-RECIPROCATE-60'. -NO TSAD SAND IN SAMPLE. Printed 3/24/2015 2:36:10PM • S Page America-ALASKA-BP age 46 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 -._.._..__ Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:00 - 03:00 1.00 DRILL P INTI DRILL 8 1/2"INTERMEDIATE HOLE LOOKING FOR 7"CASING POINT FROM 9,005'MD TO 9,010'MD(8,686'TVD) -550 GPM, 3200 PSI ON. -WOB 8-11K. -40 RPM,5-6K TORQUE ON. -PUW 210K,SOW 185K,ROT 195K. -ACTUAL ROTATE TIME=0.5 HRS. -ACTUAL SLIDE TIME=0 HRS. MUD WEIGHT:10.2 PPG IN,10.2 PPG OUT. -ROP 125 FPH. CIRCULATE BOTTOMS-UP AT 9,010'MD FOR SAMPLE. 550 GPM,3110 PSI. -40 RPM,5-8K TORQUE. -RECIPROCATE-60'. 1-NO TSAD SAND IN SAMPLE. 03:00 - 04:00 1.00 DRILL P INTI DRILL 8 1/2"INTERMEDIATE HOLE LOOKING FOR 7"CASING POINT FROM 9005'MD TO 9015'MD(8689'TVD) 550 GPM, 3200 PSI ON. -WOB 8-11K. -40 RPM,5-6K TORQUE ON. PUW 210K,SOW 185K,ROT 195K. -ACTUAL ROTATE TIME=0.5 HRS. I-ACTUAL SLIDE TIME=0 HRS. { -MUD WEIGHT:10.2 PPG IN,10.2 PPG OUT. ,-ROP DECREASED F/125 FPH T/120 FPH @ 9,012'MD,8,687.31'TVD. CIRCULATE BOTTOMS-UP AT 9015'MD FOR SAMPLES. -550 GPM,3110 PSI. 40 RPM,5-8K TORQUE. RECIPROCATE-60'. -TSAD SAND IN SAMPLE,TOP OF TSAD @ 9,012'MD,8,687.31'TVD. 04:00 - 05:00 ' 1.00 DRILL P INTI DRILL 8 1/2"INTERMEDIATE HOLE TO 7" CASING POINT FROM 9,015'MD TO 9,017'MD (8,691.49'TVD) ,-550 GPM, 3,200 PSI ON. WOB 8-11K. -40 RPM,5-6K TORQUE ON. -PUW 210K,SOW 185K,ROT 195K. ACTUAL ROTATE TIME=0.5 HRS. ACTUAL SLIDE TIME=0 HRS. -MUD WEIGHT:10.2 PPG IN,10.2 PPG OUT. -ROP DECREASED F/125 FPH T/120 FPH @ 9,012'MD,8,687.31'TVD. CIRCULATE BOTTOMS-UP AT 9,015'MD FOR SAMPLES. 550 GPM,3110 PSI. -40 RPM,5-8K TORQUE. -RECIPROCATE-60'. TSAD SAND IN SAMPLE. '*GEOLOGY CALLED 7"CASING POINT AT 9,017'WITH 5'INTO TSAD FORMATION. Printed 3/24/2015 2:36:10PM North America-ALASKA-BP S Page 47 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Firs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:00 - 06:30 1.50 DRILL P INTI CIRCULATE AND CONDITION MUD FOR UPCOMING CASING RUN. -545 GPM,2,850 PSI. -40 RPM,4K TORQUE. -HOLE CLEANED UP WITH NO LOSSES OBSERVED WITH MUD PROPERTIES IN SHAPE TO RUN CASING. PUMP HIGH VIS SWEEP-NO NOTICEABLE INCREASE IN CUTTINGS AT BOTTOMS UP. OBTAIN SPR'S AT 9,000'8,677'TVD. -10.2 PPG MW IN/OUT. -NO LOSSES OBSERVED. -MONITOR WELL 10 MIN PRIOR TO PULLING OFF BOTTOM-WELLSTATIC. PJSM FOR PULLING OUT OF THE HOLE. 06:30 - 10:00 3.50 DRILL P INTI PUMP OUT OF THE HOLE TO ABOVE THE HRZ FROM 9,017'MD TO 8,655'MD. •-97 GPM,280 PSI,-NO TIGHT SPOTS OBSERVED. -RUW-152K SOW--150K. -PULL OUT OF THE HOLE ON ELEVATORS FROM 8,655'MD TO 5,141'MD. HOLE IS SLICK,DID NOT SEE ANYTHING WHEN PULLED THROUGH THE WINDOW. -MONITOR WELL ON TRIP TANK-CORRECT HOLE FILL OBSERVED. -NO LOSSES. "KICK WHILE TRIPPING DRILL WITH SCENARIO OF ACCUMULATOR AIR PUMP FAILURE CONTINGENCY. 10:00 - 10:30 0.50 DRILL P INTI RIG SERVICE. -SERVICE AND INSPECT TOP DRIVE,BLOCKS AND DRAW WORKS. 10:30 - 13:00 2.50 DRILL P INTI RIH ON ELEVATORS FROM 5,141'MD TO 8,944' MD. -FILLING PIPE EVERY 2,000'. -DID NOT SEE ANY TIGHT SPOTS WHILE RUNNING IN THE HOLE.. -MONITORING TRIP FOR DISPLACEMENT- CORRECT DISPLACEMENT OBSERVED. 13:00 - 16:00 3.00 DRILL P INTI WASH DOWN F/8,944'TO 9,017'MD ,NO FILL OBSERVED. -CIRCULATE BOTTOMS UP STAGING PUMPS UP TO 550 GPM WITH 2,980 PSI. -RECIPROCATE PIPE 70'W/100 RPM AND 5K TO. • -PUMP 32 BBL HIGH VIS SWEEP-NO INCREASE IN CUTTINGS AT BOTTOMS UP. -TOTAL OF TWO BOTTOMS UP. -MW 10.2 PPG IN/OUT. "FLOW CHECK WELL 10 MIN-WELL STATIC. Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP • Page 48 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:OOAM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:00 - 20:00 4.00 DRILL P INTI PUMP OUT OF THE HOLE FROM 9,017'MD TO 8,719'MD. -85 GPM,260 PSI-NO TIGHT SPOTS OBSERVED. BLOW DOWN TOP DRIVE AND INSTALL STRIPPING RUBBER. POOH ON ELEVATORS FROM 8,719'MD TO 5,776'DROPPED 2.45" DRIFT ON STAND#53. -DRIFT GOT HUNG UP IN STAND#51,MADE SEVERAL ATTEMPTS TO PASS DRIFT THROUGH PIPE. -PULLED DRIFT OUT FLAGGED THE STAND AND STOOD IT BACK IN DERRICK. -RE-DROPPED DRIFT FOR REMAINDER OF STANDS WITH NO ISSUES. PULL OUT ON ELEVATORS FROM 5,776'TO 5,301'MD. '*SPR'S TAKEN AT 9,017'MD. 20:00 - 21:30 1.50 DRILL P INTI CIRCULATE BOTTOMS UP AT THE 9-5/8" WINDOW. WITH THE BIT OUTSIDE THE WINDOW. CBU X2 W/515 GPM,1980 PSI. -MW-10.2 PPG IN/OUT. I PULLED INTO THE 9-5/8"CASING WINDOW AT 5,206'. -MONITOR WELL 10 MIN-WELL STATIC. PUMP 28 BBLS DRY JOB,INSTALL STRIPPING RUBBER,AIR SLIPS. 21:30 - 00:00 2.50 DRILL r P INTI POOH ON ELEVATORS FROM 5,206'MD TO 850'MD. -MONITOR WELL 10 MIN PRIOR TO PULLING BHA THROUGH THE STACK-WELL STATIC. PJSM FOR LAYING DOWN BHA. LAY DOWN INTERMEDIATE DRILLING BHA. -MONITOR WELL ON TRIP TANK. **PHASE 2 WEATHER CALLED AT 23:00. -TOUR PUSHER NOTIFIED ONCOMING CREW AND ESTABLISHED A JOURNEY MANAGEMENT PLAN, REVIEWED PLAN WITH OUTGOING CREW AND VERIFIED COMMUNICATION WITH SITE CONTROL. 3/4/2015 00:00 - 02:00 2.00 DRILL P INTI POOH ON ELEVATORS LAYING DOWN INTERMEDIATE BHA FROM 850'MD. -MONITOR WELL ON TRIP TANK-HOLE TAKING CORRECT HOLE FILL. -MONITOR WELL 10 MIN PRIOR TO PULLING NON SHEARABLES ACROSS THE STACK- WELL STATIC. -PJSM FOR LAYING DOWN BHA. LAY DOWN ENTIRE BHA AS DIRECTED BY SLB DD. -BIT GRADE-1-2-WT-G-X-1/16-NO-TD-1/16 UNDER GUAGE-NO BALLING OBSERVED. -ALL STABS IN GUAGE. 02:00 - 04:00 2.00 DRILL P INTI CLEAN AND CLEAR RIG FLOOR. -CLEAR PIPE SHED OF DRILLING TOOLS. -PJSM FOR BEAVERSLIDE OPERATIONS- DISCUSS EXCLUSION ZONES AROUND LIFTING OPERATIONS. -PREP FOR 7"CASING RUN. Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP • Page 49 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:00 - 06:30 2.50 DRILL P INTI RIGGING UP TO RUN 7",26#,L-80, INTERMEDIATE CASING. -PJSM FOR RUNNING 7"INTERMEDIATE CASING LINER. -REVIEW DDI PROCEDURE AND PLAN j FORWARD WITH DDI CREW BAKER REP. DISCUSS HAZARDS ASSOCIATED WITH PICKING UP THE CASING TONGS-ENSURE FOSV W/7"VT XO IS MADE UP AND AVAIL. VERIFY CORRECT MAKE UP OF NON-SHEARABLE SAFETY JOINT. -MAKE UP FILL UP HOSE -PU AND MU CASING TONGS. -RU CASING ELEVATORS,DRILLER AND LEAD FLOOR HAND TO VERIFY CORRECT SIZE AND LIFTING CAPACITY 06:30 - 12:00 5.50 DRILL P INTI RUN 7",26#,L-80,INTERMEDIATE CASING. FROM SURFACE TO 3,002'MD -MAKE UP&BAKERLOK SHOE TRACK AS DIRECTED IN WELL PROGRAM I-BTC MADE UP TO POSITION ON SHOE TRACK. -CHECK FLOATS-OK. JET LUBE SEAL GUARD THREAD COMPOUND EACH CONNECTION. MU TQ=11950 FTLBS W/TORQUE TURN. -CENTRALIZER S INSTALLED IN THE PIPE SHED ACCORDING TO THE WELL PLAN -RIH W/7"CASING FILLING EACH JT ON THE FLY&TOPPING OFF EVERY 10 JTS. -MONITOR HOLE FILL VIA TRIP TANK. -MW:10.2 PPG IN/OUT. 12.00 - 12:30 0.50 DRILL P INTI RIG SERVICE -LUBRICATE RIG,GREASE AND INSPECT TOP DRIVE. 12:30 - 14:30 2.00 DRILL P INTI RUN 7",26#,L-80,INTERMEDIATE CASING. FROM 3,002'MD TO 3,780'MD -JET LUBE SEAL GUARD THREAD COMPOUND EACH CONNECTION. -MU TQ=11950 FTLBS W/TORQUE TURN. CENTRALIZER S INSTALLED IN THE PIPE SHED ACCORDING TO THE WELL PLAN -RIH W/7"CASING FILLING EACH JT ON THE FLY&TOPPING OFF EVERY 10 JTS. -MONITOR HOLE FILL VIA TRIP TANK. MW:10.2 PPG IN/OUT. -RUN 40 FLOATING CENTEK BOW SPRING CENTRALIZER JOINTS 1-34 AND THE SHOE TRACK JOINTS A,B,C 1-RIH AT 47 FT/MIN FROM SURFACE TO 3,780' MD -OBTAIN PU/SO WEIGHTS EVERY 10 JNTS -NO LOSSES WHILE RUNNING IN THE HOLE VERIFY CORRECT NUMBER OF 7"CASING REMAINING IN THE PIPE SHED AND ON LOCATION PRIOR TO RIH WITH LINER ON 4" DP. • Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP • Page 50 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:30 - 16:30 2.00 DRILL P INTI PU&MU BAKER LINER HANGER AND ZXP LINER TOP PACKER PUMP THROUGH THE LINER TO ENSURE CAPABILITY -210 GPM,WITH 186 PSI RIH WITH 7",26#,L-80,INTERMEDIATE CASING ON 4"DP STANDS FROM THE DERRICK FROM 3,780'TO 5,175'MD -RIH FILLING EVERY 5 STANDS WITH 3 BPM FOR 5 MIN WITH 350-370 PSI. MONITOR HOLE FILL VIA TRIP TANK. MW:10.2 PPG IN/OUT. -RIH ON 4"DP AT 47 FT/MIN FROM 3,780'TO 5,175' 16:30 - 18:00 1.50 DRILL P INTI CIRCULATE BOTTOMS UP ABOVE THE 9-5/8" WINDOW -CIRC 1.5XBUAT4BPM -PRESSURE=300 PSI PUW=165K,SOW=160K -MW=10.2 PPG IN/OUT 18:00 - 20:00 2.00 DRILL P INTI RIH WITH 7",26#,L-80,VTHC INTERMEDIATE CASING ON 4"DP STANDS FROM THE DERRICK F/5,175'MD TO 5,758'MD RIH FILLING EVERY 5 STANDS WITH 3 BPM FOR 5 MIN WITH 350-370 PSI. 1 STAGING PUMP UP IN 1/2 BBL INCREMENTS 'AS TO NOT SURGE THE WELLBORE -MONITOR HOLE FILL VIA TRIP TANK. -MW:10.2 PPG IN/OUT. TAGGED UP AT 5,208'MD-28'SHY OF THE WINDOW.SET DOWN 5K TO GET PAST. **OBSERVED THE CASING COLLARS HANGING UP EVERY-40'GOING THROUGH THE WINDOW. -WAS HAVING TO SET DOWN 2-3 K DOWN WEIGHT AND ROTATE PIPE FROM 3/4 TO 2 TURNS TO GET THE COLLAR PAST THE WINDOW. WITH SHOE-500'OUTSIDE THE WINDOW CALL WAS MADE TO ODE TO DISCUSS COLLARS HANGING UP AND POSSIBLE ISSUES WITH HANGER AND LINER TOP PACKER **HELD PLANNING MEETING FOR UPCOMING 7"INT CEMENT JOB.-REVIEWED PUMPING PLAN AND VERIFIED VOLUMES -BP WSL'S,SLB CEMENTERS,MI-MUD MAN, DDI TOOL PUSHER. Printed 3/24/2015 2:36:10PM North America-ALASKA-BP S Page 51 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:00 - 21:30 1.50 DRILL N DFAL 5,785.00 INTI INSTRUCTED THE DRILLER TO STOP RUNNING IN THE HOLE -WORK THE STRING AND CIRCULATE AT 3 BPM WITH 286 PSI -CONDUCTED CONFERENCE CALL WITH ANCHORAGE FOR PLAN FORWARD -CONF CALL INCLUDED BP RIG WSL'S, TOWN ODE,ETL,WELLS TEAM LEAD, ROTARY SUPT AND BAKER ENGINEERING AND FIELD REP. -DECISION WAS MADE TO CONTINUE THE CASING RUN.WITH DIRECTION TO PULL UP ON STAND TO SEE OF THE COLLAR WOULD HANG UP. -PULLED ONE STAND-NO OVER-PULL OBSERVED COMING BACK UP THROUGH THE WINDOW WITH A COLLAR AND CENTRALIZER. 21:30 - 00:00 2.50 DRILL P INTI RIH WITH 7",26#,L-80,VTHC INTERMEDIATE CASING ON 4"DP STANDS FROM THE DERRICK F/ 5,758'MD TO 6,504'MD -RIH FILLING EVERY 5TH STAND WASHING DOWN THE LAST 40'WITH 3 BPM FOR 5 MIN WITH 350-370 PSI. STAGING PUMP UP IN 1/2 BBL INCREMENTS ALLOWING FOR AS TO NOT SURGE THE WELLBORE MONITOR HOLE FILL VIA TRIP TANK. MW:10.2 PPG IN/OUT. -COLLARS STILL HANGING UP,DRILLER IS ABLE TO RUN SLOW ENOUGH TO SEE THE STRING START TAKING WEIGHT AND PUTA 1/4 TURN IN THE STRING AND WORK THE COLLAR PAST THE WINDOW. -DID NOT SEE COLLARS HANGING UP AT ALL PAST 6,409 -NO TIGHT SPOTS OR EXCESSIVE DRAG OBSERVED FROM THE FORMATION. -NO LOSSES TO THE HOLE. -OBTAIN PU SO WEIGHTS EVERY 500'TO THE TOP OF THE HRZ -RIH ON 4"DP AT 34 FT/MIN FROM 5,758'MD TO 6,504' MD Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP • Page 52 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) - Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:OOAM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/5/2015 00:00 - 07:30 7.50 CASING P INTI RIH WITH 7",26#,L-80,VTHC INTERMEDIATE CASING ON 4"DP STANDS FROM THE DERRICK F/6,504'MD TO 8,410' -RIH FILLING EVERY 5TH STAND WASHING DOWN THE LAST 40'WITH 3 BPM FOR 5 MIN WITH 350-390 PSI. STAGING PUMP UP IN 1/2 BBL INCREMENTS 'AS TO NOT SURGE THE WELLBORE. MONITOR HOLE FILL VIA TRIP TANK. MW:10.2 PPG IN/OUT. -NO TIGHT SPOTS OR EXCESSIVE DRAG OBSERVED FROM THE FORMATION. NO LOSSES TO THE HOLE. -OBTAIN PU SO WEIGHTS EVERY 500'TO THE TOP OF THE HRZ. -RIH ON 4"DP AT 34 FT/MIN FROM 6,504' MD 8,410'MD. WASH DOWN FROM 8,410'MD TO 8,688'MD (-64')ABOVE THE HRZ 1-WASH DOWN AT 20 MIN A STAND WITH 3 BPM,350 TO 380 PSI -STAGING PUMP UP IN 1/2 BBL INCREMENTS TO 3 BPM AS TO NOT SURGE THE WELLBORE. -CIRCULATE ONE FULL BOTTOMS UP PRIOR TO REACHING THE HRZ. RIH ON ELEVATORS FROM 8,688'MD TO 8,973' MD -MAKE UP SINGLE AND 15'PUP AND ROTATING CEMENT HEAD,MAKE UP CEMENT LINE. -WASH DOWN THE LAST 45'TO BOTTOM AND TAG AT 9,017'MD WITH 10K DOWN WEIGHT, P/U TO BREAK OVER WEIGHT OF 255K AND PLACE 7"CASING SHOE AT 9,015'MD. 07:30 - 11:00 3.50 CASING P INTI CIRCULATE AND CONDITION MUD FOR CEMENT OPERATIONS AS PER GP 10-60. STAGE PUMPS UP SLOWLY IN 1/4 BBL INCREMENTS TO 2 BPM,ALLOWING PRESSURE TO STABILIZE AT EACH INCREMENT FOR 10 MIN,AND MONITORING FOR LOSSES. -STAGE PUMPS UP IN 1/2 BBLS INCREMENTS FROM 2 BPM TO 5 BPM W/670 PSI ICP AND 590 PSI FCP WHILE WORKING PIPE STRETCH AND NOT MOVING SHOE OUT OF TSAD. -MW:10.2 IN/10.2+OUT WITH MUD PROPERTIES IN ADHERANCE WITH GP 10-60STANDARDS. *CIRCULATE 3 BOTTOMS UP TOTAL. Printed 3/24/2015 2:36:10PM North America-ALA ;51- Operation Summary Report ', Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 11:30 0.50 CASING P INTI PJSM WITH ALL PERSONNEL FOR CEMENTING 7"INTERMEDIATE LINER. DISCUSS JOB PLANS IN DETAIL AND EXPECTATIONS. -ASIGN ROLES AND RESPONSIBILITIES AND VERIFY SINGLE POINT OF CONTACTS FOR EACH GROUP ALONG WITH MEANS OF COMMUNICATION. DISCUSS STOPPING POINTS OF TASK AND WHAT WILL BE THE REACTION IF SCENARIO OBSERVED. REVIEW PRESSURE CROSSCHECK LIST AND IDENTIFY CHALLENGE QUESTIONS WITH CORRECT RESPONSES. *CONTINUE CIRCULATING WITH RIG PUMPS WHILE CONDUCTING PJSM. 11:30 - 12:00 0.50 CASING P 1 INTI PRESSURE TEST CEMENT LINES TO 250/ 14750 PSI. -NOTIFY DSO OF PRESSURE TEST AND MAKE HUB ANNOUNCEMENT OF EXCLUSION ZONES WHILE PRESSURE TESTING. OPEN BLEEDER AT MUD MANIFOLD AND PURGE SLB HARDLINE WITH 10 BBLS FRESH WATER BACK TO MUD PITS. -CLOSE LOWER TIW VALVE ON ROTATING CEMENT HEAD. -CONFIRM STALL OF PUMPING UNIT IN FIFTH GEAR WITH WSL WITNESS OF STALL AT 700 PSI. -PRESSURE UP TO 305 PSI AND HOLD FOR FIVE MINUTES.GOOD LEAK TIGHT TEST WITH ENDING PRESSURE OF 300 PSI. SET TRIP SETS AT 1000 PSI.AND WSL WITNESS TRIP SET FUNCTION PROPERLY AT 1000 PSI. -PRESSURE UP TO 4700 PSI WHEN LEAK ON TREATING IRON OBSERVED WITH SMALL DRIP INTO DRIP PAN OF HARDLINE CONNECTION. BLEED PRESSURE AND BLOW DOWN LINE, BREAK APART TREATING LINE AND CHANGE OUT BAD RUBBER GASKET ON 1502 CONNECTION. -OPEN BLEEDER ON MUD MANIFOLD AND PURGE TREATING IRON WITH 5 BBLS OF FRESH WATER. -PRESSURE UP TREATING IRON FROM SLB PUMP TO ROTATING CEMENT HEAD TO 4675 PSI.GOOD LEAK TIGHT TEST WITH ENDING PRESSURE OF 4552 PSI. -RESET TRIP SET AT 1500 AND FUNCTION, WSL WITNESS TRIP SET FUNCTION PROPERLY AT 1500 PSI. -BLEED OFF ALL PRESSURE AND BLOWAIR THROUGH TREATING IRON. Printed 3/24/2015 2:36:10PM Operation Sui'z'attovl '04 mmary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161 V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 13:00 1.00 CASING P INTI CONTINUE CIRCULATING WITH RIG PUMPS WHILE SLB BATCH MIX 15.8 PPG CEMENT. -OPEN LOWER TIW VALVE ON ROTATING CEMENT HEAD AND LINE UP MUD MANIFOLD TO PUMP THROUGH ROTATING CEMENT HEAD VIA CEMENT STAND PIPE HOSE. STAGE PUMPS UP SLOWLY IN 1/4 BBL INCREMENTS TO 2 BPM,ALLOWING PRESSURE TO STABILIZE AT EACH INCREMENT FOR 10 MIN,AND MONITORING FOR LOSSES. STAGE PUMPS UP IN 1/2 BBLS INCREMENTS FROM 2 BPM TO 5 BPM W/670 PSI ICP AND 590 PSI FCP WHILE WORKING PIPE STRETCH AND NOT MOVING SHOE OUT OF TSAD. -MW:10.2 IN/10.2+OUT WITH MUD PROPERTIES IN ADHERANCE WITH GP 10-60 STANDARDS. SLB FINISH BATCH MIXING CEMENT AND CONFIRM WITH SCALES CEMENT WEIGHT OF 15.8 PPG. Printed 3/24/2015 2:36:10PM North America-ALA iE Operation Summary Report Common Well Name 09-03 AFE No Event Type.RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time.3/22/1976 12:00:00AM Rig Release. Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 14:00 1.00 CEMT P INTI CEMENT 7"INTERMEDIATE CASING AS FOLLOWS -SHUT DOWN RIG PUMPS AND LINE UP MUD MANIFOLD FOR CEMENTERS TO PUMP THROUGH ROTATING CEMENT HEAD. -SLB,DDI AND WSL CONFIRM VALVING ON MUD MANIFOLD. PUMP 30 BBLS OF 11 PPG MUDPUSH II SPACER @ 5 BPM,490 PSI. -PUMP 47.8 BBLS OF 15.8 PPG CLASS G TAIL @ 5 BPM,EXCESS VOLUME 30% (YIELD 1.16 C U.FT/SK) -DROP DP WIPER DART. -PUMP 10 BBLS OF FRESH WATER TO CLEAN TREATING IRON ON TOP OF WIPER DART WITH 80 PSI. PERFORM DISPLACEMENT WITH SLB PUMPING UNIT AND 10.2 PPG LSND MUD PER SLB CADE. -CATCH DP WIPER DART WITH 34 BBLS TOTAL DISPLACED AT 7 BPM,SLOW PUMP RATE BACK TO 5 BPM. -50 BBLS DISPLACED AT 5 TO 7 BPM:ICP 100 PSI 24%RETURN FLOW,FCP 300 PSI 24% RETURN FLOW REDUCE RATE TO 3 BPM PRIOR TO DP WIPER DART LATCHING LINER WIPER DART. OBSERVE DART LATCH WITH 51 BBLS DISPLACED WITH 1300 PSI.PRESSURE SPIKE FROM 300 PSI. -145 BBLS TOTAL DISPLACED AT 5 BPM.ICP 300 PSI 24%RETURN FLOW,FCP 400 PSI 24% RETURN FLOW. -WITH 145 BBLS TOTAL DISPLACED REDUCE RATE TO 3 BPM WHEN CEMENT AT SHOE WITH PRESSURE AT 200 PSI. -WITH 152 BBLS TOTAL DISPLACED INCREASE RATE TO 5 BPM WITH 470 PSI.ICP AND 960 PSI.FCP WITH 24%RETURN FLOW. -WITH 193 BBLS TOTAL DISPLACED REDUCE RATE TO 2 BPM PRIOR TO PLUG BUMP:FINAL CIRCULATING PRESSURE 1000 PSI. BUMP PLUG AND INCREASE PRESSURE TO 1300 PSI,HELD FOR 5 MIN. -BLEED PSI BACK TO SLB UNIT TO CHECK FLOATS-GOOD -TOTAL DISPLACEMENT VOLUME 199.7 BBLS -TOTAL LOSSES FROM CEMENT EXIT SHOE TO CEMENT IN PLACE:0 BBLS. CEMENT IN PLACE AT 13:50 PM. Printed 3/24/2015 2:36:10PM SNorth America-ALASKA-BP S Page 56 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 14:30 0.50 CASING P INTI SET LINER HANGER AND LINER TOP PACKER. -SET HANGER AND LTP PER BAKER PROCEDURE USE SCHLUMBERGER PUMP TRUCK TO PRESURE UP AND SET HANGER WITH 3800 PSI. -S/O TO SET HANGER WITH 65K DOWN. P/U TO EXPOSE DOG SUB -TURN ROTARY ON AT 20 RPM WITH 3K FREE TQ -S/O TO ZXP PACKER WITH 50K DOWN.AND 8K TQ TO CONFIRM SET. 14:30 - 15:30 1.00 CASING P INTI CIRCULATE BOTTOMS UP CIRCULATE BOTTOMS UP AT 12 BPM AT 980 i PSI. -MUD WEIGHT 10.2 IN/OUT. NO CEMENT RETURNS SEEN AT SURFACE 15:30 - 16:00 0.50 CASING P INTI R/D CEMENT HEAD -R/D CEMENT HEAD AND BREAK DOWN SAFETY JOINT. 16:00 - 21:00 5.00 CASING P INTI POOH WITH LINER RUNNING TOOL FROM 5127'TO SURFACE. MONITOR WELL FOR 10 MIN PRIOR TO PULLING OFF BOTTOM:STATIC. -B/D TOP DRIVE. -POOH STANDING BACK 4"DP IN DERRICK. L/D RUNNING TOOL. MONITOR WELL 10 MIN PRIOR TO PULLING RUNNING TOOL THROUGH THE STACK- WELL STATIC -MONITOR WELL VIA TRIP TANK.-WELL TAKING CORRECT HOLE FILL SERVICE BREAK LINER RUNNING TOOL. -POSITIVE INDICATOR ON DOG SUB OF SHEAR. NO UNUSUAL OF WEAR DETECTED. -CLEAN AND CLEAR RIG FLOOR. REMOVE WEAR RING AND INSTALL TEST PLUG. 21:00 - 23:00 2.00 BOPSUR P INTI CHANGE BOPE RAMS -PJSM.-REVIEW DDI PROCEDURE FOR C/O RAMS-DISCUSS HAZARDS,HAND SAFETY, WORKING AT HEIGHTS -DISCUSS WELL CONTROL -MONITORED WELL PRIOR TO CHANGING OUT THE RAMS-WELL STATIC -SHUT BLIND RAMS - CHANGE UPPER RAMS FROM 7"CASING RAMS TO 2 7/8"X 5"VBRS. -BARRIERS IN PLACE FOR BREAKING CONTAINMENT: TESTED BLIND SHEAR RAMS,KWF WITH STATIC FLUID COLUMN 23:00 - 00:00 1.00 BOPSUR P INTI R/U BOPE TEST EQUIPMENT -PJSM -R/U BOPE TEST EQUIPMENT TO TEST UPPER RAMS AFTER CHANGING FROM 7" CASING RAMS TO 2 7/8"X 5"VBRS. -PRESSURE TEST 2 7/8"X 5"VBRS ON 2 7/8" AND 4 1/2"TEST JOINTS. -PRESSURE TEST THE ANNULAR ON 2 7/8" TEST JOINT ONLY. Printed 3/24/2015 2:36:10PM III North America-ALASKA-BP Page 57 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:OOAM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 .____.-._-. Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/6/2015 00:00 - 03:30 3.50 BOPSUR P INTI PRESSURE TEST BOPE -PJSM-REVIEW PRESSURE CROSS CHECK LIST FOR PROPER LINE UP FOR TESTING. DISCUSS EXCLUSION ZONE MANAGEMENT FOR HIGH PRESSURE TESTING. -PRESSURE TEST 2 7/8"X 5"VBRS ON 2 7/8" AND 4 1/2"TEST JOINTS. '-PRESSURE TEST THE ANNULAR PREVENTER ON 2 7/8"TEST JOINT. -PULL TEST PLUG AND INSTALL WEAR RING W/8-15/16"ID VERIFIED BY DRILLER 03:30 06:00 2.50 CASING P INTI PRESSURE TEST 7"X 9-5/8"LTP AND 7" CASING. -CEMENT HAS REACHED 500 PSI COMPRESSIVE STRENGTH AT 2300 HRS ON 3/6/2015. PJSM FOR TESTING THE LTP AND 7"LINER. REVIEW THE PRESSURE CROSS CHECK CHECKLIST,DISCUSS PROPER LINE UP FOR PRESSURE FLOW&VERIFIED. PT 7"LINER AND LINER LAP TO 250 PSI LOW FOR 5 MINS-GOOD. -PT 7"LINER AND LINER LAP TO 3500 PSI HIGH FOR 30 MINS-GOOD. PUMPED 6.9 BBLS TO REACH PRESSURE AND BLED BACK 6.5 BBLS. -BLOW DOWN CHOKE AND KILL LINES. `CONTACT WTLAND RECEIVE AUTHORIZATION TO PROCEED AFTER SUCCESSFUL MIT TEST. 06:00 - 10:00 4.00 CASING P INTI M/U 6 1/8"MOTOR BHA#3 FOR PRODUCTION SECTION PJSM FOR M/U 6 1/8"DRILLING BHA. -M/U 4 3/4"MUD MOTOR WITH IMPULSE MWD. -RUN 18 JTS 4"DRILL PIPE BELOW 4"HWDP AND 4 3/4"JARS TO 1193'. 10:00 - 15:30 5.50 CASING P INTI RIH PICKING UP 4"DRILL PIPE SINGLES FROM PIPE SHED -RIH PICKING UP 4"DRILL PIPE SINGLES OUT OF PIPE SHED TO 2100'. -SHALLOW TEST MWD AT 2100'. GOOD TEST. -220 GPM WITH 1300 PSI WITH 10.2 PPG MUD WEIGHT. -CONTINUE RIH PICKING UP 4"DRILL PIPE SINGLES OUT OF THE PIPE SHED TO 3662'. *TOTAL 4"DRILL PIPE SINGLES PICKED UP= 78 SINGLES(2468.68') CONTINUE RIH WITH STDS OUT OF DERRICK TO 8789'. -M/U TOP DRIVE AND WASH DOWN FROM 8789'TO 8882'. DID NOT SEE ANY CEMENT. Printed 3/24/2015 2:36:10PM S - - North AmericaALASKABP 1110 Page 58 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:OOAM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 ._.__.._.... Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:30 - 18:00 2.50 CEMT P INTI DISPLACE WELL TO 8.5 PPG POWER-PRO. -PJSM AND REVIEW DDI FLUID MANAGEMENT POLICY WITH PERSONNEL INVOLVED IN DISPLACEMENT. PUMP 38 BBLS WEIGHTED SWEEP. -INITIAL PRESSURE 2289 PSI. -FINAL PRESSURE 1263 PSI. WORK STRING 95'WITH 40 RPM ROTARY AT 2-3K TORQUE. 1*TAKE SLOW PUMP RATES. 18:00 - 19.00 1.00 CEMT P INTI FLOW CHECK WELL AFTER DISPLACEMENT -PERFORM 10 MINUTE FLOW CHECK,NO FLOW. -CLEAN OUT TRIP TANK OF RESIDUAL 10.2 FLUID. -LINE UP TRIP TANK AND FILL WITH CLEAN 8.5 PPG POWER-PRO FLUID. 19:00 - 21:30 2.50 CEMT P INTI PERFORM NEGATIVE TEST ON 7"LINER LAP -MONITOR WELL FOR 30 MINUTES ON TRIP TANK,NO FLOW. SIMOPS OPERATIONS WHILE PERFORMING 30 MINUTES FLOW CHECK PJSM-REVIEW PROCEDURE FOR SLIP AND CUT OPERATIONS-DISCUSS EMPHASIS ON HAND SAFETY -SLIP/CUT 59'DRILL LINE. -SERVICE TOP DRIVE,CROWN,OPEN TOP DRIVE JAWS AND INSPECT THREADS ON XT39 SAVER SUB, VERIFIED BY WSLAND TOOLPUSHER USING MANUFACTURE SUGGESTED INSPECTION PROCEDURE. 21:30 - 00:00 2.50 CEMT P INTI WASH AND REAM LANDING COLLAR/SHOE TRACK -TAG CEMENT AT 8917'MD(-13')OF CEMENT ON TOP OF PLUG,WASH AND REAM DOWN BY DRILLING TALLY DEPTHS: -TAG INSERT COLLAR ON DEPTH AT 8930' MD. -TAG FLOAT COLLAR ON DEPTH 8965'MD. -220 GPM,1160 PSI ON / 1060 PSI OFF. -20-50 RPM,2-3K TORQUE ON,1K TORQUE OFF. -PU=190K,SO=180K,ROT WT=185K,WOB= 5-10K. -MUD WEIGHT 8.5 PPG IN,8.5 PPG OUT. -NO LOSSES. Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP • Page 59 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. _ UWI:500292020900 Active datum:09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/7/2015 00:00 - 02:00 2.00 CEMT P INTI WASH AND REAM LANDING COLLAR/SHOE TRACK -TAG CEMENT AT 8917'MD WASH AND REAM DOWN -BY DRILLING TALLY DEPTHS: -TAG INSERT COLLAR ON DEPTH AT 8930' MD. TAG FLOAT COLLAR ON DEPTH 8965'MD. -TAG FLOAT SHOE&DRILL REMAINDER OF SHOE TRACKAND 20'OF NEW HOLE F/9017' MD T/9037/8708'ND. -220 GPM,1160 PSI ON / 1060 PSI OFF. -20-50 RPM,2-3K TORQUE ON,1K TORQUE OFF. PU=190K,SO=180K,ROT WT=185K,WOB= 15-10K. -MUD WEIGHT 8.5 PPG IN,8.5 PPG OUT. 02:00 - 03:30 1.50 CEMT P INTI CIRCULATE BOTTOMS UP PRIOR TO FIT. 220 GPM,1100 PSI,50 RPM, - RECIPROCATE FULL STAND. -SHUT DOWN WITH 8.5 PPG IN/OUT -NO LOSSES -8.5 PPG MW,IN/OUT MONITOR WELL FOR 10 MIN-WELL STATIC 03:30 - 06:00 2.50 CEMT P INTI PERFORM FORMATION INTEGRITY TEST. -PULL UP INTO THE 7"CASING SHOE -PJSM FOR FIT TEST-REVIEW DDI SOP- , DISCUSS AND VERIFY LINE UP,VERIFY PRESSURE CROSS CHECK -R/U EQUIPMENT TO PERFORM FIT TEST -R/U CHART RECORDER,SWING,TEE, SENSATOR -FLUID PACK SENSATOR LINE -CHECK CHART RECORDER AND ENSURE i WORKING PROPERLY -FLUID PACK TUBING AND KILL LINE PERFORM FIT TEST TO 10.5 EMW. -8.5 PPG MUD,8,690'TVD,9,015'MD -PUMP 1.8 BBLS&PRESSURE UP TO 910 PSI, SHUT IN AND MONITOR -OBSERVE A 10 PSI BLEED OFF IN 10 MIN -SHUT DOWN TEST&BLEED BACK-1.8 BBL -SEND RESULTS OF FIT TO THE ODE. ZERO BBL LOSSES FOR TOUR. 06:00 - 12:00 6.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE F/9037'MD TO 9167'MD(8813'ND) 250 GPM,1390 PSI ON 1090 PSI OFF. 40 RPM,3K TORQUE ON,5K TORQUE OFF. -PU=190K,SO=182K,ROT WT=187,WOB= 10K. -SURVEY EVERY-30'. -ACTUAL ROTATE TIME=3.53 HOURS. -ACTUAL SLIDE TIME=2.26 HOURS. JAR TIME=5.79 HOURS. -MUD WEIGHT 8.5 PPG IN,8.5 PPG OUT. -TAKE SLOW PUMP RATES AT 8979'MD/ 8660'TVD. _ *ZERO BBL LOSSES FOR TOUR. Printed 3/24/2015 2:36:10PM 110 North America-ALASKA-BP S Page 60 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12'00.00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 00:00 12.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE F/9167'MD TO 9549'MD(9014'TVD) -250 GPM,1500 PSI ON 1400 PSI OFF. -40 RPM,BK TORQUE ON,5K TORQUE OFF. -PU=225K,S0=176K,ROT WT=190,WOB= 12K. -SURVEY EVERY-30'. ACTUAL ROTATE TIME=3.45 HOURS. -ACTUAL SLIDE TIME=4.91 HOURS. -JAR TIME=8.36 HOURS. -MUD WEIGHT 8.6 PPG IN,8.6 PPG OUT. -TAKE SLOW PUMP RATES AT 9549'MD/ 9014'TVD. j*ZERO BBL LOSSES FOR TOUR. 3/8/2015 00:00 - 12:00 ' 11.00 DRILL P PROD1 I DRILL 6-1/8"PRODUCTION HOLE FROM 9549' MD TO 9650'MD/9029'TVD. 250 GPM,1450 PSI ON 1370 PSI OFF. -40 RPM,6-7K TORQUE ON,5K TORQUE OFF. -PU=220K,S0=170K,ROT Wr=193,WOB= 25K. -SURVEY EVERY-30'. -ACTUAL ROTATE TIME=1.26 HOURS. ACTUAL SLIDE TIME=6.38 HOURS. -JARS HOURS=21.79 -MUD WEIGHT 8.6 PPG IN,8.6+PPG OUT. EXPERIENCED LOSSES BETWEEN 9600'TO 9645'AT 18 BPH. -108 BBLS LOSSES FOR THIS TOUR. *OBTAIN SPR'S AT 9640'MD/9031'TVD. *SPILL DRILL/TABLE TOP 12:00 - 21:00 9.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE FROM 9650' MD TO 9800'MD/9018'TVD. -250 GPM,1550 PSI ON 1370 PSI OFF. -40 RPM,7-8K TORQUE ON,6K TORQUE OFF. -PU=226K,S0=165K,ROT Wr=185,WOB= 23K. -SURVEY EVERY-30'. -ACTUAL ROTATE TIME=3.26 HOURS. -ACTUAL SLIDE TIME=2.82 HOURS. -JARS HOURS=27.87 -MUD WEIGHT 8.6+PPG IN,8.6 PPG OUT. 21 00 - 23:00 2.00 DRILL P PROD1 PUMP HIGH VIS SWEEP -PUMP 30 BBLS HI-VIS SWEEP. -CBU X 1 1/2. -250 GPM,1500 PSI. -40 RPM,3K TORQUE. -MAINTAIN FULL RETURNS. -DID NOT OBSERVE ANY INCREASE IN CUTTINGS FROM SWEEP. -MUD WEIGHT 8.6 PPG IN AND 8.6 PPG OUT. *OBTAIN SPR'S AT 9800'/9018'TVD. Printed 3/24/2015 2.36'10PM • North America-ALASKA-BP • Page 61 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:00 - 00:00 1.00 DRILL P PROD1 POOH WITH 6-1/8"DRILLING ASSEMBLY ON ELEVATORS FROM 9800'TO 8979'. -STAND BACK 1 STAND OF DRILL PIPE. -PULL 5 STANDS MONITORING FOR SWABBING-NONE OBSERVED -BLOW DOWN TOP DRIVE. -LINE UP TRIP TANK. PU=228K,SO=165K. -OBTAIN SPR'S AT 9330'MD/8927'TVD. MONITOR HOLE FILL FOR TRIP ON TRIP TANK-OBSERVE CORRECT HOLE FILL. *ZERO BBL LOSSES FOR THIS TOUR. TOTAL REPORT TIME=23 HOURS DUE TO DAYLIGHT SAVINGS TIME. 3/9/2015 00:00 - 00:30 0.50 DRILL P PROD1 POOH ON ELEVATORS TO P/U RSS BHA WITH PDC BIT. -MONITOR WELL FOR 10 MINUTES-STATIC. -POOH ON ELEVATORS FROM 8979'TO 8509'. -P/U 215K,S/O 170KAT 8979'MD. -MW8.6PPG IN/OUT. 00:30 - 01.00 0.50 DRILL P PROD1 PUMP DRY JOB -26 BBL,9,5 PPG. -210 GPM, 680 PSI. -MUD WEIGHT 8.6 PPG IN AND 8.6 PPG OUT. 01:00 - 05:30 4.50 DRILL P PROD1 POOH ON ELEVATORS TO P/U RSS BHA WITH PDC BIT. -MONITOR WELL FOR 10 MINUTES-STATIC. -POOH ON ELEVATORS FROM 8509'TO 1200'. P/U 215K,S/O 170KAT 8509'MD. *(D1)KICK WHILE TRIPPING DRILL: -PLANNED DRILL TO INCLUDE THE TP LIFTING THE FLOW PADDLE TO TEST REACTION TIME OF THE DRILLER&CREW. CREW RESPONDED ACCORDINGLY WITH STANDING ORDERS TO SHUT IN A WELL. AAR:DISCUSSED WHAT WENT WELL:CREW RESPONDED AND SECURED WELL IN A TIMELY MANNER WITH CORRECT RESPONSES AND REACTIONS. -WHAT WENT WRONG:IT WAS DISCOVERED THAT THERE WERE TWO DIFFERENT KEYS FOR THE TIW AT THE DRILLERS STATION. WAS DISCUSSED AND AGREED TO KEEP ONLY THE ONE FOR THE TIW BEING USED AT THE DRILLERS STATION. 05:30 - 07:30 2.00 DRILL P PROD1 L/D MOTOR BHA PJSM FOR BHA HANDLE:DISCUSS HAND SAFETY&PROPER LIFTING OF TOOLS -MONITOR WELL FOR 10 MINUTES BEFORE PULLING BHA THROUGH BOPE-STATIC. -STAND BACK 2 STANDS 4"HWDP WHICH INCLUDES JARS. L/D REMAINING 5 JTS 4"HWDP,FLEX COLLARS,AND DIRECTIONAL TOOLS. Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP S Page 62 pf 70 Operation Summary Repor4•Stav Am,t Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12.00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:30 - 08:30 1.00 DRILL P PROD1 FUNCTION TEST BOPE -FUNCTION TEST BSRS AND CHOKE AND KILL LINES HCR VALVES AS PER WEEKLY FUNCTION TEST. -WHILE PERFORMING FUNCTION TESTS, REMOVE BHA#3 COMPONENTS FROM RIG FLOOR,AND BRING BHA#4 COMPONENTS TO RIG FLOOR. 08:30 11:30 3.00 DRILL P PROD1 M/U BHA#4 WITH RSS AS DIRECTED BY THE SLB DD. MAKE UP IMPULSE AND ADN. PJSM FOR INSTALLING SOURCE,REVIEW HAZARDS AND MITIGATIONS-MAKE ANNOUNCEMENTS. -INSTALL SOURCE PER SLB PROCEDURE. 11:30 12:00 0.50 DRILL P PROD1 RIH WITH 6 1/8"RSS-PDC BIT DRILLING BHA -RIH WITH 6 1/8"DRILLING BHA FROM 177'TO 1601'ON ELEVATORS. -BREAK CIRCULATION AND FILL DRILL PIPE 'EVERY 20 STANDS AT 250 GPM. -P/U 75K,5/0 75K AT 1601'. -12 BBLS LOSSES FOR THIS TOUR. 12:00 - 13:00 1.00 DRILL P PROD1 RIH WITH 6 1/8"RSS-PDC BIT DRILLING BHA -RIH WITH 6 1/8"DRILLING BHA FROM 1601' TO 2076'ON ELEVATORS. -BREAK CIRCULATION AND FILL DRILL PIPE EVERY 20 STANDS AT 250 GPM. SHALLOW TEST MWD-GOOD TEST. _ 13:00 - 13:30 0.50 DRILL P PROD1 FUNCTION TEST BOPE -PJSM FOR FUNCTION TESTING:REVIEW DDI PROCEDURE -FUNCTION TEST 2 7/8"X 5"VBRS,3 1/2"X 6" VBRS,AND ANNULAR PREVENTER ON 4" DRILL PIPE AS PER WEEKLY FUNCTION TEST. 13:30 - 17:00 3.50 DRILL P PROD1 RIH WITH 6 1/8"RSS-PDC BIT DRILLING BHA RIH WITH 6 1/8"DRILLING BHA FROM 2076' TO 3979'ON ELEVATORS. P/U 12 EACH 4"DRILL PIPE SINGLES FROM THE PIPE SHED. -CONTINUE RIH 4"RILL PIPE OUT OF THE DERRICK TO 9753'. -BREAK CIRCULATION AND FILL DRILL PIPE 'EVERY 20 STANDS AT 250 GPM. 17:00 - 17:30 0.50 DRILL P PROD1 WASH DOWN -250 GPM,1550 PSI -OBTAIN SPRS AT 9753'. -WASH/REAM FROM 9753'TO 9800'TDMD. *HOLE SLICK,NO FILL ON BOTTOM. Printed 3/24/2015 2:36:10PM • North America-ALASKA-,BP • Page 63 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 00:00 6.50 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE WITH RSS PDC BHA FROM 9800 MD TO 9930 MD/9012' TVD. 250 GPM,1600 PSI ON BTM,1490 PSI OFF BTM. -120 RPM,7-9K TORQUE ON,6K TORQUE OFF. -P/U=220,S/O=180K,ROT=188K, WOB= 12K. MW 8.6 PPG IN/OUT. -SURVEY EVERY-95'. ACTUAL ROTATE TIME=6 HOURS. -JARS TIME=33.9. -MW 8.6 PPG IN / 8.7 PPG OUT OBTAIN SPRS AT 9800'MD,9021'TVD. - SPR'S TAKEN *ZERO BBL LOSSES FOR THIS TOUR. 3/10/2015 00:00 - 12:00 12.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE WITH RSS- PDC BHA FROM 9,930'MD TO 10,286'MD/ ,-8900'TVD. -250 GPM,1,540 PSI ON BTM,1,450 PSI OFF BTM. -80 RPM,8K TORQUE ON,6K TORQUE OFF. -P/U=200K,S/O=173K,ROT=185K, WOB=8K. MW 8.6 PPG IN/OUT. SURVEY EVERY-95'. -ART=10.58 HRS -OBTAIN SPR'S AT 9,939'MD/9,010'TVD. -BACKREAM 94'PRIOR TO CONNECTION, WITH PUMP OUTPUT REDUCED TO 75%ON DOWN STROKE. *ZERO BBL LOSSES FROM 0000 HRS TO 1200 HRS. 12:00 00:00 12.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE WITH RSS- PDC BHA FROM 10,286'MD TO 10,575'MD/, 8,928'TVD. -260 GPM,1,640 PSI ON BTM,1,580 PSI OFF BTM. -80 RPM,6K TORQUE ON,5K TORQUE OFF. -P/U=220K,S/O=170K,ROT=187K, WOB=7K. -MW 8.6 PPG IN/8.7 PPG OUT. -SURVEY EVERY-95'. -ART=10.67 HRS -OBTAIN SPR'S AT 10,418'MD/8,957'TVD. BACKREAM 94'PRIOR TO CONNECTION, WITH PUMP OUTPUT REDUCED TO 75%ON DOWN STROKE. *ZERO BBL LOSSES FROM 1200 HRS TO 2400 HRS. Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP • Page 64 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/11/2015 00:00 - 12:00 12.00 DRILL P PROD1 DRILL6-1/8"PRODUCTION HOLE WITH RSS- PDC BHA FROM 10,575'MD TO 10,948'MD/ 8,883'TVD -260 GPM,1,620 PSI ON BTM,1,600 PSI OFF BTM. -80 RPM,7K TORQUE ON,5K TORQUE OFF. -P/U=200K,S/0=168K,ROT=183K, WOB= 7K. MW 8.6 PPG IN/8.7 PPG OUT. I-SURVEY EVERY-95'. ART=9.79 HRS. -OBTAIN SPR'S AT 10,604'MD/8,928'TVD. -PUMPED HIGH VIS SWEEP AT 10,837'MD. SAW 5-10%INCREASE IN CUTTINGS WHEN SWEEP BACK AT SURFACE. *ZERO BBL LOSSES FROM 0000 HRS TO 1200 HRS. 12:00 - 00:00 12.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE WITH RSS- PDC BHA FROM 10,948'MD TO 11,260'MD/ 8,843'TVD 260 GPM,1,560 PSI ON BTM,1,500 PSI OFF BTM. 80 RPM,5-6K TORQUE ON,5K TORQUE OFF. P/U=200K,S/O=160K,ROT=180K, WOB= 5K. -MW 8.6 PPG IN/8.7 PPG OUT. SURVEY EVERY-95'. -ART=10.41 HRS. ,-OBTAIN SPR'S AT 10,986'MD/8,877'TVD. 150 BBL WHOLE MUD TREATMENT THROUGHT THE DAY DUE TO HIGH MBT'S *ZERO BBL LOSSES FROM 1200 HRS TO 2400 HRS. 3/12/2015 00:00 - 12:00 12.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE WITH RSS- PDC BHA FROM 11,260'MD TO 11,523'MD/ 8,814'TVD -260 GPM,1,750 PSI ON BTM,1,640 PSI OFF BTM. -140 RPM,10K TORQUE ON,6K TORQUE OFF. -P/U=210K,S/O=160K,ROT=180K, WOB= 12K. -MW 8.6 PPG IN/8.7 PPG OUT. -SURVEY EVERY-95'. -ART=10.32 HRS -OBTAIN SPR'S AT 11,268'MD/8,847'TVD. PUMPED HIGH VIS SWEEP AT 11,338'MD. 15%INCREASE IN CUTTINGS OBSERVED AT BOTTOMS UP *ZERO BBL LOSSES FROM 00:00 HRS TO 1200 HRS. Printed 3/24/2015 2:36:10PM North America-ALASKA-BP • Page 65 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 00:00 12.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE WITH RSS- PDC BHA FROM 11,523'MD TO 12,185 MD/ 8,748'TVD -260 GPM,1,630 PSI ON BTM,1,630 PSI OFF BTM. -150 RPM,9K TORQUE ON,8K TORQUE OFF. -P/U=200K,S/O=165K,ROT=180K, WOB= 10K. -MW 8.6 PPG IN/8.7 PPG OUT. -SURVEY EVERY-95'. ART=9.33 HRS -OBTAIN SPR'S AT 12,029'MD/8,771'TVD. BACK REAM PRIOR TO CONNECTION FOR LAST THREE STANDS. PUMPED HIGH VIS SWEEP AT 11,338'MD. 15%INCREASE IN CUTTINGS OBSERVED AT BOTTOMS UP *ZERO BBL LOSSES FROM 1200 HRS TO 2400 HRS. 3/13/2015 00:00 - 06:00 6.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE FROM 12,185'MD TO 12,600' -260 GPM,1,630 PSI ON BTM,1,630 PSI OFF BTM. -150 RPM,9K TORQUE ON,8K TORQUE OFF. -P/U=200K,S/O=165K,ROT=177K, WOB= 10K. -MW 8.7 PPG IN/8.7 PPG OUT. -SURVEY EVERY-95'. -ART=8.96 HRS -OBTAIN SPR'S AT 12,596'MD/8,776'TVD. -BACK REAM PRIOR TO CONNECTION 94' PUMPED HIGH VIS SWEEP AT 11,338'MD. 15%INCREASE IN CUTTINGS OBSERVED AT BOTTOMS UP *ZERO BBL LOSSES FROM 00::00 HRS TO 12:00 HRS. 06:00 - 13:00 7.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE FROM 12,185'MD TO 12,600' -260 GPM,1,630 PSI ON BTM,1,630 PSI OFF BTM. -150 RPM,9K TORQUE ON,8K TORQUE OFF. -P/U=200K,S/O=155K,ROT=178K, WOB= 10K. -MW 8.7 PPG IN/8.7 PPG OUT. -SURVEY EVERY-95'. -ART=8.96 HRS -BACK REAM PRIOR TO CONNECTION 94' *ZERO BBL LOSSES FROM 00::00 HRS TO 12:00 HRS. Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP • Page 66 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 17:30 4.50 DRILL P PROD1 CONDITION HOLE AFTER TD -CIRCULATE 2X BOTTOMS UP -260 GPM,1700 PSI. 120 RPM,6-7K TORQUE RECIPROCATE ONE FULL STAND WHILE CIRCULATING,RETURNING TO BOTTOM EACH TIME PUMP HIGH VIS SWEEP SURFACE TO SURFACE -132 GPM,WITH 570 PSI,CHASED BY 8.6 PPG MUD AT 260 GPM,1700 PSI -MW=8.6 PPG IN AND 8.7 PPG OUT. TOTAL OF 3 BOTTOMS UP NO NOTICABLE INCREASE IN CUTTINGS RETURNS AT BOTTOMS UP OR AFTER SWEEP AT SURFACE NO LOSSES WHILE CIRCULATING. TAKE SPR'S @ 12,944'MD,8,685'TVD-8.6 PPG MW 17:30 - 20:00 2.50 DRILL P PROD1 POOH ON ELEVATORS WITH 6-1/8"DRILLING •I BHA F/12,958'T/9,848'MD MONITOR WELL PRIOR TO PULLING OFF BOTTOM.-WELL STABLE -PU W-205K,SOW-156K MW=8.6 PPG IN/OUT POOH MONITORING FOR SWABBING-NO SWABBING OBSERVED -NO TIGHT SPOTS ENCOUNTERED TRIP MONITORED ON TRIP SHEET BY DRILLER&PIT WATCHER WITH CORRECT HOLE FILL OBSERVED -AVG-100 FT/MIN PULL SPEED 20:00 - 00:00 4.00 DRILL ! P PROD1 MAD PASS OPERATIONS -DISCUSS AND VERIFY CORRECT MAD PASS DEPTHS&PARAMETERS. -MAD PASS FROM 9,848'MD TO 9,395'MD -200 GPM AT 80-100 RPM -MAX PULLING SPEED 300 FPH -PULL TO MAX BLOCK HEIGHT FOR 30 SECONDS -LOWER BACK DOWN TO BREAK CONNECTION -SET DEPTH WITH MWD AT EACH CONNECTION BREAK Printed 3/24/2015 2:36:10PM North America-ALASKA-BP • Page 67 Of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/14/2015 00:00 - 03:30 3.50 DRILL P PROD1 MAD PASS OPERATIONS -DISCUSS AND VERIFY CORRECT MAD PASS DEPTHS&PARAMETERS. MAD PASS FROM 9,395'MD TO 9,030'MD -200 GPM AT 80-100 RPM -MAX PULLING SPEED 300 FPH -PULL TO MAX BLOCK HEIGHT FOR 30 SECONDS -LOWER BACK DOWN TO BREAK CONNECTION -SET DEPTH WITH MWD AT EACH CONNECTION BREAK **DURING MAD PASS AT 9,355'MD, WELLBORE BEGAN TAKING FLUID AT 8 BPH MONITOR WELLBORE PRIOR TO PULLING INTO 7"CASING-OBSERVE 12 BPH STATIC LOSS RATE -PULL UP INTO 7"CASING IN PREPARATION FOR BOPE TEST 03:30 - 08:30 5.00 DRILL P PROD1 RIG UP FOR BOPE TEST -PJSM FOR PULLING WEAR RING WITH INLINE WEAR RING PULLING TOOL. MU AND RIH WITH FMC WEAR RING PULLING TOOL. ENGAGE WEAR RING W/2-3 K DOWN WEIGHT,ATTEMPT TO PULL -WEAR RING CAME OFF THE PULLING TOOL ON THE FIRST ATTEMPT -RE-ENGAGED AND PULLED WEAR RING TO SURFACE AND LAYDOWN. MAKE UP FMC INLINE TEST PLUG,RIH&SET IN WELL HEAD PROFILE WITH DRILL STRING HUNG OFF BELOW. -RIGGED UP BELOW THE TEST PLUG ON THE IA TO ENSURE WELLBORE IS FILLED AND MONITORED WHILE TESTING BOPE.* FMC REP TO RILDS,WSL VERIFY CORRECT MEASUREMENTS FOR THE LOCK DOWN SCREWS. RIG UP BOPE TESTING EQUIPMENT Printed 3/24/2015 2:36:10PM • North Arnenca ALASKA BP • Page 68 of 70 mss" M Operation Summary Report Common Well Name:09-03AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:30 - 20:00 11.50 BOPSUR P PROD1 PRESSURE TEST BOPE -PJSM FOR PRESSURE TESTING.DISCUSS PRESSURE CROSS CHECK AND DISCUSS HAZARDS AND MITIGATIONS FOR WORKING WITH PRESSURE. -FILL CHOKE MANIFOLD AND MGS,6 BBLS TO FILL. TEST BOPE WITH 2-7/8"4",4-1/2",AND TEST JOINTS. PRESSURE TEST TO 250/3500 PSI FOR 5 MIN EACH, NO FAILURES. -ALL TESTS CHARTED SEE ATTACHED TEST CHART -24 HR NOTICE GIVEN TO AOGCC AT 03:00, 3/13 -TEST WITNESS WAIVED BY STATE INSPECTOR-JOHNNY HILL WELL CONTROL DRILL PERFORMED PRIOR TO TESTING-DRILL CALLED WITH WELL SECURE AND TEST JOINT& PLUG IN THE HOLE.CREW RESPONDED TO ASSIGNED POSITIONS AND DRILLER CLOSED THE ANNULAR. MONITOR AND FILL THE HOLE THROUGH THE IAAT AVG 8 BPH 20:00 - 21:00 1.00 BOPSUR P PROO1 RIG DOWN TEST EQUIPMENT -SUCK OUT STACK&BLOW DOWN THE CHOKE AND KILL LINES 21:00 - 00:00 3.00 WHSUR P PROD1 PULL TEST PLUG AND INSTALL WEAR RING. -PJSM FOR PULLING TEST PLUG AND RUNNING OF FMC WEAR RING RUNNING TOOL. -MAKE UP RIH AND ENGAGE TEST PLUG, PULL TO RIG FLOOR AND LAYDOWN -MAKE UP WEAR RING ON RUNNING TOOL, RIH AND SET IN TUBING PROFILE -FMC TO RILDS.-VERIFIED CORRECT MEASUREMENT FOR LDS. -POOH WITH RUNNING TOOL AND LAYDOWN. WEAR RING-8-3/4"ID,13-3/8"OD LINE UP THE HOLE FILL TO THE TRIP TANK AND START FILLING THROUGH THE HOLE FILL LINE. -AVG STATIC LOSS RATE AT-5 BPH. 3/15/2015 00:00 - 01:00 1.00 WHSUR P PROD1 INSTALL WEAR RING -COMPLETE INSTALL OF WEAR RING WITH 8- 3/4"ID LD LANDING JOINT -PREP FOR SLIP&CUT OPERATIONS LINE UP THE HOLE FILL TO THE TRIP TANK AND START FILLING THROUGH THE HOLE FILL LINE. -AVG STATIC LOSS RATE AT-5 BPH. Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP • Page 69 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:00 - 04:00 3.00 DRILL P PROD1 SLIP AND CUT DRILLING LINE PJSM FOR SLIP AND CUT OPERATIONS -REVIEW DDI PROCEDURE,DISCUSS HAND SAFETY AND PPE FOR HANDLING WIRE MONITOR AND FILL HOLE ON TRIP TANK- STATIC LOSS RATE AT-4 BPH WHILE SLIP AND CUT DRILL LINE INSPECT THE SAVER SUB USING DDI PROCEDURE FOR INSPECTION PER THE MANUFACTURER RECOMMENDATIONS FOR INSPECTION.-MET MANUFACTURER CRITERIA FOR PASSING 04:00 - 04:30 0.50 DRILL P PROD1 1RIG SERVICE -SERVICE AND INSPECT TOP DRIVE AND BLOCKS. -CALIBRATE BLOCK HEIGHT WITH MWD -TEST CROWN SAVER. 04:30 - 09:00 4.50 DRILL P PROD1 I RIH WITH 6-1/8"DRILLING BHA FROM 8,898' TO 12,958'MD -RIH ON ELEVATORS -FILL AND BREAK CIRCULATION EVERY20 'STANDS MONITOR FOR CHANGE IN LOSSES AND ADJUST TRIP SPEEDS ACCORDINGLY -PUW=190K,SOW=175KAT 8,990'MD '-TIGHT HOLE OBSERVED(15K) FROM 9,285'- 9,758',9,810'-9,820',9,970'-10,050',AND 10,160'-10,600'MD.WORKED PIPE TWICE THROUGH EACH INTERVAL ABLE TO CLEAN UP EACH SPOT WITH NO ISSUE 09:00 - 13:30 4.50 DRILL P PROD1 CIRCULATE WELLBORE PRIOR TO POOH -STAGE PUMPS UP TO FULL RATE IN 5 GPM INCREMENTS -260 GPM,1940 PSI -PUW=205K,SOW=150K,120 RPM,TQ=6K CIRCULATE 2X BOTTOMS UP -OBSERVE 80%CUTTINGS INCREASE AND PRESSURE DROP TO 1800 PSI AT BOTTOMS UP PUMP 35 BBL,10 PPB NUT PLUG SWEEP AT 260 GPM,1840 PSI,160 RPM,7-8K TO -ROTATE AND RECIPROCATE 1 STAND WHILE PUMPING SWEEP AROUND -NO SIGNIFAGANT INCREASE IN CUTTINGS RETURNS AT BOTTOMS UP WITH THE SWEEP -POOH F/12,958'T/12,885'MD AND RACK BACK 1 STAND -BLOW DOWN TOP DRIVE -MW=8.6 PPG IN/OUT *54 BBL LOSSES FROM 00:00-12:00 HRS Printed 3/24/2015 2:36:10PM • North America-ALASKA-BP • Page 70 of 70 Operation Summary Report Common Well Name:09-03 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/5/2015 End Date: ,X3-0161V-C:(9,794,732.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:30 - 19:00 5.50 DRILL P PROD1 POOH WITH 6-1/8"DRILLING BHA FROM 12,885'TO 4,277'MD -MONITOR WELLBORE PRIOR TO PULLING OFF BOTTOM-6 BPH STATIC LOSSES OBSERVED -POOH ON ELEVATORS FROM 12,885'TO 11,936'MD RACKING BACK 4"DP STANDS PUW=204K,SOW=161 K AT 12,885'MD -PUMP 30 BBL 9.7 PPG DRY JOB FOLLOWED BY 12 BBL 8.6 PPG FLO PRO -POOH ON ELEVATORS FROM 11,936'TO 4,277'MD -DROP 2"STEEL RABBIT WITH 100'TAIL DOWN DRILLPIPE AT 9,468'MD(STAND 95)IN PREPARATION FOR LINER RUN 19:00 - 21:00 2.00 DRILL P PROD1 POOH WITH 6-1/8"DRILLING BHA FROM 4,277' TO 367'MD -LD JARS -PUW=115K,SOW=115K AT 4,277'MD -PU 4"HWDP SINGLE AND RACK BACK 3 STANDS HWDP TO 3,974'MD -POOH ON ELEVATORS FROM 3.974'TO 367' MD MONITORING DISPLACEMENT ON TRIP TANK, HOLE TAKING A BBL MORE PER 5 STANDS ON DISPLACEMENT 21:00 - 00:00 3.00 DRILL P PROD1 LAY DOWN 6-1/8"DRILLING BHA -PJSM FOR LD BHA,HANDLING SOURCE, AND NON-SHEARABLES ACROSS STACK -LD BHA PER SLB DD AND MWD -CLEAN AND CLEAR RIG FLOOR FOR UPCOMING LINER RUN - ENSURE EXCLUSION ZONES ARE MONITORED FOR SOURCE REMOVAL -RECOVER RABBIT *26 BBL LOSSES FROM 12:00-00:00 HRS -SWITCH TO COMPLETION EVENT Printed 3/24/2015 2:36:10PM • • North Amen., Operation Su Common Well Name:09-03 I AFE No Event Type:COM-ONSHORE(CON) Start Date:3/16/2015 End Date: X3-0161V-C.(4,008,268.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:OOAM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/16/2015 00:00 - 02:30 2.50 CASING P RUNPRD RIG UP FOR 4-1/2"PRODUCTION LINER RUN -0/0 ELEVATORS.DRILLER VERIFIED CORRECT SIZE&CAPACITY -R/U POWER TONGS.DRILLER AND LEAD FLOOR HAND VERIFY CORRECT TONG HEAD SIZE. RU TORQUE TURN -RU FILL UP HOSE -VERIFY PIPE COUNT IN CASING SHED-WSL VERIFIED HOLD PJSM FOR RUNNING 4-1/2"LINER -RIG CREW,DOYON CASING,BP WSL, BAKER REPS PRESENT REVIEW DDI PROCEDURE FOR RUNNING LINER. -DISCUSS PLAN FOR NON-SHEARABLES ACROSS STACK,HAND SAFETY AND PROPER TONG OPERATION,AND PROPER FLUID TRACKING DURING LINER RUN. -ENSURE 4.5"VT XO IS AVAIL ON THE FLOOR AND MADE UP TO THE FOSV ENSURE SHEAR JOINT IS MADE UP AND AVAILABLE. *CONTINUE TO MONITOR WELL ON TRIP TANK WHEN RIGGING UP-STATIC 3BPH LOSS RATE OBSERVED. 02.30 - 09:30 7.00 CASING P RUNPRD RUN 4-1/2",12.6#,13CR VAM TOP LINER TO 4,068'MD MAKE UP SHOE TRACK AND BAKER LOCK CONNECTIONS -PUMP 2-3 BBLS THROUGH SHOE TRACK, PICK UP&CHECK FLOATS-FLOATS GOOD WSL VERIFIED. -USE JET LUBE SEAL GUARD ON ALL CONNECTIONS -TORQUE TURN ALL CONNECTIONS TO 4,400 FT/LBS -RUN 2-6-1/8"CENTEK CENTRALIZERS PER JOINT INSTALLED IN CASING SHED PRIOR TO JOB. -RUN 3 6-1/6"CENTEK CENTRALIZERS PER JOINT ON JTS#50-85 -NO CENTRALIZERS 50'EITHER SIDE OF THE 7"SHOE -FILLING PIPE ON THE FLY W/FILL UP HOSE- TOPPING OFF EVERY 10 -TAKE PU&SO WEIGHTS EVERY 10 JOINTS. -MONITOR TRIP ON TRIP TANK -96 FT/MIN RUN SPEED,WATCHING FOR CHANGE IN LOSSES VOLUMES. -MONITOR TRIP ON TRIP TANK WELL TAKING FLUID, AVG 5 BPH -MW 8.6 PPG IN/OUT Printed 3/24/2015 2:36:48PM • North America-ALASKA-BP S Page 2 of 11 Operation Summary Report Common Well Name:09-03 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/16/2015 End Date: X3-0161V-C:(4,008,268.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:30 - 11:00 1.50 P RUNPRD PU BAKER LINER HANGER AND ZXP LINER TOP PACKER ASSEMBLY WITH HRD-E RUNNING TOOL -PU HANGER WITH 3-1/2"LIFT SUB WITH 4.5" (NECK PUW-98K,SOW-98K VERIFY PROPER PIPE COUNT IN CASING SHED AFTER LAST JOINT LINER PICKED UP. BAKER REP MIX AND INSTALL PAL MIX MU BUMPER SUB -MU 4"HWDP STAND TO HANGER ASSEMBLY KELLY UP AND CIRCULATE THROUGH LINER RUNNING TOOL PER BAKER REP X BBLS TOTAL LOSSES FOR 00:00-12:00 HRS 11:00 - 17:00 6.00 CASING P RUNPRD RIH W/4-1/2"12.6#,VT 13CR85 L-80 SOLID 1 LINER ON 4"XT39 DP STANDS FROM DERRICK TIH F/4,068'MD TO 8,954'MD. -OBTAINING PU&SO WEIGHTS AND FILLING EVERY 10 STANDS. PUW=202K,SOW=165K AT 8,954'MD TIH AT 90-100 FT/MIN MONITORING DISPLACEMENT ON THE TRIP TANK -3-5 BPH LOSSES OBSERVED WHILE RIH -MW-8.6 PPG+IN/OUT 17:00 - 18:00 1.00 CASING P 1 RUNPRD CIRCULATE 1.5 X LINER AND DP VOLUME AT 8,954'MD(49')ABOVE THE SHOE. -STAGE UP PUMP IN HALF BARREL INCREMENTS TO FINAL PUMP RATE OF 253 GPM AT 560 PSI. ,*DYNAMIC LOSS RATE AT FULL RATE 3-5 BPH 18:00 - 21:30 3.50 CASING P RUNPRD RIH W/4-1/2"12.6#,VT 13CR85 L-80 SOLID LINER ON 4"XT39 DP STANDS FROM DERRICK TIH F/8,954"MD TO 12,958'MD -RUN IN TO 12,928'MD OBTAINING PU&SO WEIGHTS AND FILLING EVERY 10 STANDS. -PUW=202K,SOW=165KAT 12,958'MD -TIH AT 90-100 FT/MIN -MONITORING DISPLACEMENT ON THE TRIP TANK -3-5 BPH LOSSES OBSERVED WHILE RIH -MW=8.7 PPG IN/OUT 21:30 - 22:00 0.50 CASING P RUNPRD RIG UP CEMENT HEAD AND CEMENT LINES RIH WITH 31.69'SINGLE AND CEMENT HEAD. -WASH DOWN AT 0.5 BPM TO TD -TAG ON DEPTH AT 12,958'MD WITH 15K DOWN -PU TO BREAK OVER+2 FEET AND MARK PIPE FOR RECIPROCATION Printed 3/24/2015 2:36:48PM • Page 3 of 11 North America-ALASKA-BP rr Operation Summary Report Common Well Name:09-03 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/16/2015 End Date 1X3-0161V-C:(4,008,268.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:00 - 00:00 2.00 CASING P RUNPRD CIRCULATE AND CONDITION MUD FOR CEMENT OPERATIONS. -STAGE PUMPS UP TO CEMENTING RATE IN 0.5 BBL INCREMENTS TO FINAL CIRCULATING RATE OF 6 BPM.ALLOW PRESSURE TO STABILIZE AT EACH INCREMENT -@ 0.5 BPM,300 PSI @ 1.0 BPM,410 PSI -@ 1.5 BPM,470 PSI -@ 2.0 BPM,546 PSI -@ 3.0 BPM,660 PSI -@ 4.0 BPM,790 PSI -@ 5.0 BPM,900 PSI -@6.OBPM,127GPSI -RECIPROCATE PIPE 20'WHILE CIRCULATING -MW=8.6+PPG IN/OUT 3/17/2015 00:00 - 04:00 4.00 CASING P RUNPRD CIRCULATE AND CONDITION MUD FOR CEMENT OPERATIONS -CIRCULATE AT FINAL CEMENTING RATE OF 6 BPM WITH FCP OF 1,270 PSI CIRCULATE 3X BOTTOMS UP -NO LOSSES OBSERVED WHILE CIRCULATING AT 6 BPM -AT 01:30,HOLE CONDITIONS DICTATED TO STOP RECIPROCATION AND PLACE LINER AT FINAL SET DEPTH OF 12,956'MD SIM-OPS-LOADING TRUCKS FOR CEMENT DISPLACEMENT 04 00 - 04:30 0.50 CASING P 1 RUNPRD PRE JOB SAFETY MEETING REVIEW HAZARDS FOR HIGH PRESSURE TESTING AND PUMPING -REVIEW SLB PLAN FORWARD DISCUSS LINE UP FOR PRESSURE CROSS CHECK-CHECK LIST -DISCUSS EXCLUSION ZONES AND APPROPRIATE SIGNAGE -ENSURE PUMP TRIPS ARE SET CORRECTLY -WSL AND CEMENTER AGREE ON THE USE OF RECENT CADE 04:30 - 05:00 0.50 CASING P RUNPRD PRESSURE TEST LINES -PRESSURE TEST 250 LOW/4500 PSI HIGH- GOOD TEST -WSL VERIFIED SLB OVERPRESSURE SHUT DOWN EQUIPMENT-AT 1,850 PSI -LINE UP AND PREPARE TO BATCH MIX CEMENT. -START BATCH MIXING MUD PUSH&CEMENT Printed 3/24/2015 2:36:48PM • North America-ALASKA-BP Page 4 of 11 Operation Summary Report Common Well Name:09-03 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/16/2015 End Date: X3-0161V-C:(4,008,268.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:OOAM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:00 - 09:30 4.50 CASING P RUNPRD CEMENT 4.5"PRODUCTION LINER AS FOLLOWS: -PUMP 50.0 BBLS OF 10.0 PPG MUDPUSH II SPACER @ 5.2 BPM,1,050 PSI PUMP 95.1 BBLS OF 15.8 PPG CLASS G TAIL @ 4.7 BPM,EXCESS VOLUME 30%+200' ABOVE LINER. (YIELD 1.16 CU.FT/SK) DROP DRILL PIPE WIPER DART. PERFORM DISPLACEMENT WITH SLB PUMPS -150.9 BBLS DISPLACED AT 2-6 BPM:ICP 206 PSI WITH FULL RETURNS,FCP 1,030 PSI WITH FULL RETURNS.DISPLACEMENT SLOWED TO 4 BPM AT 125 BBL AWAY DUE TO PRESSURE COMING UP TO 1,900 PSI MAX PER WELL PLAN I-DISPLACEMENT FLUID:68 BBLS OF 8.6 PPG PERF PILL FOLLOWED BY 82.9 BBL OF 8.7 PPG POWER PRO -LATCH UP CONFIRMED AT 89.8 BBLS DISPLACED,OBSERVE PRESSURE INCREASE 'TO 1,900 PSI REDUCE RATE TO 2 BPM PRIOR TO PLUG BUMP:FINAL CIRCULATING PRESSURE 1,030 PSI -TOTAL DISPLACEMENT VOLUME 150.9 BBLS. (MEASURED BY SLB MICRO MOTION) INCREASE PRESSURE TO 2,800 PSI TO SET HANGER AFTER PLUG BUMP -SET DOWN 65K PER BAKER REP TO CONFIRM HANGER SET -CHECK FLOATS-GOOD INCREASE PRESSURE TO 4,200 PSI TO RELEASE RUNNING TOOL PU 5'TO EXPOSE DOG SUB AND SET DOWN ON LINER TOP 55K.SEE SHEAR AT 25K DOWN WITH 20 RPM PU 23'TO EXPOSE RS PACK-OFF AND CIRCULATE EXCESS CEMENT OFF LINER TOP FOR 45 BBLS AT 12 BPM WITH 830 PSI. PU RUNNING TOOL ABOVE LINER TOP AND MARK NO-GO.CIRCULATE 2X BU AT 14 BPM, 1,750 PSI -—20 BBLS OF CEMENT CONTAMINATED MUDPUSH OBSERVED ON SURFACE AT BOTTOMS UP -0 BBLS TOTAL LOSS DURING CEMENT JOB *CEMENT IN PLACE AT 06:45 AM *TOTAL WASHUP TIME 7 MIN 43 SEC *SINGLE HOSE FROM CEMENT MANIFOLD TO TON RIG FLOOR WITH VALVING AND SINGLE HOSES TO CEMENT HEAD OR MUD BUCKET LINE 09:30 - 12:00 2.50 CASING P RUNPRD RIG DOWN CEMENT EQUIPMENT -LAY DOWN 2 JOINTS OF 4"DP -LAY DOWN CEMENT HEAD AND 4"DP SINGLE -MONITOR WELL FOR 10 MINUTES-STATIC -CLEAN AND CLEAR RIG FLOOR -EMPTY PITS 1,2,3 -CLEAN PIT 4 AND BRING ON SEAWATER FOR UPCOMING DISPLACEMENT Printed 3/24/2015 2:36:48PM • North America-ALASKA-BP Pages of 11 Operation Summary Report Common Well Name:09-03 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/16/2015 End Date: X3-0161V-C:(4,008,268.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:OOAM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth 1 Phase Description of Operations (hr) (usft) 12:00 - 12:30 0.50 CASING P RUNPRD SERVICE RIG -LUBRICATE TOP DRIVE INSPECT DRAWWORKS,BLOCKS,TOP DRIVE,ST-80 12:30 - 15:00 2.50 CASING P RUNPRD 1DISPLACE WELLBORE WITH 8.5 PPG SEAWATER -DISPLACE 8.6 PPG FLO PRO WITH 8.5 PPG SEAWATER ,-430 GPM,1,500 PSI -RECIPROCATE PIPE 30 FT -PUMP 38 BBL 8.5 PPG HIGH VIS SPACER FOLLOWED BY 8.5 PPG SEAWATER FLUSH FLO PRO FROM BOTH MUD PUMPS -TAKE SPR'S AT 8,775'MD FLOW CHECK WELL-STATIC !-BLOW DOWN TOP DRIVE SIM-OPS-CLEAN PITS,FLUSH FLO PRO 'FROM SURFACE EQUIPMENT 15:00 - 17:00 2.00 CASING P RUNPRD POOH WITH HRD-E LINER RUNNING TOOL FROM 8,775'TO 4,228'MD -PUW=188K,SOW=173K AT 8,775'MD MW=8.5 PPG IN/OUT 17:00 - 22:00 5.00 CASING P RUNPRD POOH FROM 4,228'TO 270'MD LAYING DOWN 4"DP SINGLES AND BHA -PJSM FOR LAYING DOWN DP AND NON-SHEARABLES ACROSS STACK REVIEW DDI PROCEDURE -LD 4"DP SINGLES,HWDP,AND HRD-E RUNNING TOOL MW=8.5 PPG IN/OUT 22:00 00:00 2.00 CASING P RUNPRD 1PRESSURE TEST 4-1/2"PRODUCTION LINER -PJSM FOR PRESSURE TESTING LINER. REVIEW DDI PROCEDURE,DISCUSS PRESSURE CROSS-CHECK,EXCLUSION ZONES,AND PROPER SIGNAGE -PRESSURE TEST 4-1/2"PRODUCTION LINER TO 250 PSI LOW FOR 5 MIN/3,500 PSI HIGH FOR 30 MIN-GOOD TEST -TOOK 7.8 BBL TO PRESSURE UP TO 3,500 PSI.BLED BACK 7.8 BBLS -OBTAIN WTL APPROVAL PRIOR TO PROCEEDING 3/18/2015 100:00 - 02:30 2.50 PERFOB P OTHCMP RU FOR PERFORATION RUN RIG UP SLB TOOLS AND CROSSOVERS FOR PICKING UP PERF GUNS -C/O ELEVATORS -DRILLER VERIFIED PROPER ELEVATOR SIZE AND CAPACITY -BRING DOUBLE STACK TONGS UP TO RIG FLOOR -WSL VERIFIED CORRECT GUN AND PIPE COUNT IN CASING SHED -PJSM WITH SLB AND DD PERSONNEL REVIEW SLB SOP ON PICKING UP AND MAKING UP GUNS -ENSURE SAFETY JT IS MADE UP IN THE SHED WITH PROPER CROSSOVER Printed 3/24/2015 2:36:48PM North America-ALASKA-BP I Page 6 of 11 Operation Summary Report • 1 Common Well Name:09-03 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/16/2015 End Date: X3-0161V-C:(4,008,268.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:30 - 11:00 8.50 PERFOB P OTHCMP RIH W/SLB PERF GUN ASSEMBLY T/4,244' MD -P/U AND M/U PERFORATING ASSEMBLY PER SLB REP AND RUNNING ORDER -PUW=110K,SOW=107K AT 4,244'MD 11:00 - 13:30 2.50 PERFOB P OTHCMP RIH WITH PERF GUN ASSEMBLY FROM 4,244' TO 8,137'MD RIH ON 4"DP STANDS FROM DERRICK 13:30 - 14:00 0.50 PERFOB P OTHCMP TROUBLESHOOT DRAW WORKS TRACTION BLOWER MOTOR A.SERVICE TOP DRIVE AND DRAW WORKS 14:00 - 17:00 3.00 PERFOB P OTHCMP RIH WITH PERF GUN ASSEMBLY FROM 8,137' TO 12,313'MD -RIH ON 4"DP STANDS FROM DERRICK 17:00 - 19:00 2.00 PERFOB P OTHCMP SLIP AND CUT DRILLING LINE 19:00 - 20:00 1.00 PERFOB P OTHCMP INSPECT SAVER SUB 20:00 - 21:00 1.00 PERFOB P OTHCMP RIH WITH PERF GUN ASSEMBLY FROM 12,313'TO 12,869.88'MD -TAG LANDING COLLAR ON DEPTH AT 12,869.88'MD WITH 5K DOWN -POOH TO SHOT DEPTH GET ON DEPTH AND PLACE BOTTOM SHOT AT 12,770.65'MD -PUW=190K,SOW=165K AT 12,869.88'M_D 21:00 - 22:30 1.50 PERFOB P OTHCMP PERFORATE WELLBORE PER SLB REP -PJSM FOR SHOOTING GUNS WITH RIG CREW,WSL,AND SLP TCP REPS.REVIEW DDI PROCEDURE.DISCUSS EXCLUSION ZONES,PRESSURE SEQUENCE FOR ARMING AND ABORTING GUNS. -ENSURE ALL LINES PURGED FREE OF AIR -SHUT TOP RAMS ON 4"DP -PUMP DOWN ANNULUS AND DP TO PRESSURE UP TO 1000 PSI -MAKE PRACTICE PRESSURE AND ABORT SEQUENCE-GOOD -PRESSURE UP TO 1000 PSI AND INITIATE PRESSURE SEQUENCE -FIRST FIRING HEAD FIRED 7 MINUTES AFTER PRESSURE SEQUENCE -SECOND FIRING HEAD FIRED 12 MINUTES AFTER PRESSURE SEQUENCE -WELL TOOK INITIAL 2.5 BBLS FLUID AFTER GUNS FIRED -POOH FROM 12,770.65'TO 12,693'MD AND BLOW DOWN TOP DRIVE 22 30 - 00:00 1.50 PERFOB P OTHCMP POOH ON ELEVATORS FROM 12,693'TO 9,751' MD. -PUW=190K,SOW=165KAT 12,693'MD MW=8.5 PPG IN/OUT 3/19/2015 00:00 - 00:30 0.50 PERFOB P OTHCMP POOH ON ELEVATORS FROM 9,751'TO 8,820' MD. -PUW=160K,SOW=155K AT 8,820'MD -MW=8.5 PPG IN/OUT -FLOW CHECK WELL AFTER PULLING TO LINER TOP-STATIC 00:30 - 02:00 1.50 PERFOB P OTHCMP CIRCULATE BOTTOMS UP -410 GPM,1,840 PSI Printed 3/24/2015 2:36.48PM North America-ALASKA-BP • Page 7 of 11 Operation Summary Report Common Well Name:09-03 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/16/2015 End Date: X3-0161V-C:(4,008,268.00) Project:Prudhoe Bay i Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:00 - 06:00 4.00 PERFOB P OTHCMP POOH ON ELEVATORS FROM 8,820'TO 4,244' MD -POOH LAYING DOWN 4"DP SINGLES -MW=8.5 PPG IN/OUT 06:00 - 14:00 8.00 PERFOB P OTHCMP POOH ON ELEVATORS FROM 4,244'MD TO SURFACE -PJSM FOR LD PERF GUN ASSEMBLY. REVIEW DDI PROCEDURE FOR HANDLING PERF GUNS.DISCUSS PLAN FOR NON-SHEARABLES ACROSS THE STACK, PROPER GLOVES WHILE HANDLING GUNS, I DOUBLE STACK TONG OPERATION,AND EXCLUSION ZONES WHILE LAYING GUNS DOWN C/O ELEVATORS -POOH LD PAC HT PIPE-AND PERF GUNS 14:00 - 15:00 1.00 PERFOB P OTHCMP CLEAN AND CLEAR RIG FLOOR -R/D PERF RUN EQUIPMENT -BEAVER SLIDE OPS-MOB PERF HANDLING EQUIP OFF DRILL FLOOR -R/D DOUBLE STACK TONGS C/O ELEVATORS 15:00 - 17:30 2.50 j PERFOB P OTHCMP RIH WITH 4"DP STANDS FROM DERRICK TO 4,270'MD 17:30 - 21:30 4.00 PERFOB P OTHCMP POOH LAYING DOWN 4"DP SINGLES FROM 4,270'MD -KICK WHILE TRIPPING DRILL.CRT=1 MIN 52 SEC 21:30 - 22:30 1.00 WHSUR P OTHCMP PULL WEAR RING -MU WEAR RING PULLER TO 4"DP SINGLE I-ENGAGE WEAR RING AND PULL LD SINGLE AND WEAR RING PULLER -FLUSH BOPE STACK AT 335 GPM,30 PSI,100 RPM 22:30 - 00:00 1.50 RUNCOM P RUNCMP RIG UP FOR 4-1/2"COMPLETION RUN -C/O ELEVATORS.DRILLER VERIFIED CORRECT SIZE&CAPACITY -R/U POWER TONGS.DRILLER AND CASING HAND VERIFY CORRECT TONG HEAD SIZE. -RU TORQUE TURN VERIFY PIPE COUNT AND JEWELRY COUNT IN CASING SHED-WSL,DRILLER,HES REP VERIFIED HOLD PJSM FOR RUNNING 4-1/2" COMPLETION -RIG CREW,DOYON CASING,BP WSL, HALLIBURTON REP PRESENT.REVIEW DDI PROCEDURE FOR RUNNING COMPLETION. -DISCUSS PLAN FOR NON-SHEARABLES ACROSS STACK HAND SAFETY AND PROPER TONG OPERATION,AND PROPER FLUID TRACKING DURING COMPLETION RUN -ENSURE 4.5"VT XO IS AVAILABLE ON THE FLOOR AND MADE UP TO THE FOSV ENSURE SHEAR JOINT IS MADE UP AND AVAILABLE. I*CONTINUE TO MONITOR WELL ON TRIP TANK WHEN RIGGING UP-STATIC Printed 3/24/2015 2:36:48PM North America-ALASKA-BP Page 8 of 11 Operation Summary Report Common Well Name:09-03 AFE No Event Type:COM-ONSHORE(CON) Start Date 3/16/2015 End Date: X3-0161V-C:(4,008,268.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/20/2015 00:00 - 08:00 8.00 RUNCOM P RUNCMP RIH W/4-1/2"12.6#13CR VAM TOP COMPLETION TO 5,431'MD -TORQUE TURN 4-1/2"VAM TOP CONNECTIONS TO 4,400 FT-LBS -BAKER-LOCK ALL CONNECTIONS BELOW HES TNT COMPLETION PACKER -USE JET LUBE SEAL GUARD ON ALL CONNECTIONS ABOVE PACKER -MW=8.5 PPG IN/OUT -NO LOSSES WHILE RUNNING COMPLETION 08:00 - 12:00 4.00 RUNCOM N HMAN RUNCMP TROUBLESHOOT GLM STUCK IN AIR SLIPS -GLM#7 HUNG UP IN AIR SLIPS WHEN RUNNING THROUGH FLOOR -REMOVE GLM FROM AIR SLIPS SEND GLM TO SLB FOR EVALUATION. REPLACED DCR-1 VALVE WITH NEW TESTED VALVE. *SEE IR#2015IR4956469 -MONITOR WELLBORE ON TRIP TANK WHILE STOPPED -SIM-OPS- -PREP CELLAR AND CHOKE SKID FOR REVERSE CIRCULATION AND FREEZE ;PROTECT OPS -GREASE DRAWWORKS -CLEAN RIG FLOOR -BOILER#2 FIRE DRILL-CRT=1 MIN 30 SEC 12:00 - 17:00 5.00 RUNCOM P RUNCMP RIH W/4-1/2"12.6#13CR VAM TOP COMPLETION FROM 5,431'TO 8,757'MD -TORQUE TURN 4-1/2"VAM TOP CONNECTIONS TO 4,400 FT-LBS -USE JET LUBE SEAL GUARD ON ALL CONNECTIONS -NO LOSSES WHILE RUNNING COMPLETION -KICK WHILE TRIPPING DRILL-CRT=1 MIN 54 SEC 17:00 - 20:00 3.00 RUNCOM P RUNCMP j LOCATE TIEBACK RECEPTACLE ON 4-1/2" PRODUCTION LINER -OBTAIN PARAMETERS.PUW=141K,SOW= 136K -SLOWLY RIH AND TAG UP ON BOTTOM OF TBR WITH 4K DOWN -CONFIRM BOTTOM OF TBR AT 8863' -MAKE FINAL SPACE OUT CALCULATIONS AND POOH,LD ADDITIONAL JTS USED TO TAG UP 20:00 - 20:30 0.50 RUNCOM P RUNCMP SPACE OUT AND LAND 4-1/2"COMPLETION -MU SPACEOUT PUPS,JT#202,TUBING HANGER,AND LANDING JT -RIH AND LAND HANGER -FMC REP CONFIRMED HANGER LANDED AND RILDS TO 450 FT-LBS -WLEG AT 8857.7'(5.5'INTO TBR) Printed 3/24/2015 2:36.48PM • North America-ALASKA-BP • Page 9 of 11 Operation Summary Report Common Well Name:09-03 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/16/2015 End Date: X3-0161V-C:(4,008,268.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 00:00 3.50 RUNCOM P RUNCMP REVERSE CIRCULATE CORROSION INHIBITED SEAWATER PJSM WITH BP,MI,CH2,HES AND RIG !CREW.REVIEW DDI PROCEDURE FOR REVERSE CIRCULATION. -REVERSE CIRCULATE 140 BBLS 8.5 PPG 1 120°SEAWATER AT 162 GPM W/500 PSI. REVERSE CIRCULATE 156 BBLS OF 8.5 PPG 120°SEAWATER WITH 0.5%KI-3869 CORROSION INHIBITOR AT 165 GPM W/500 PSI. 3/21/2015 00:00 - 01:30 1.50 ' RUNCOM P ' RUNCMP REVERSE CIRCULATE CORROSION INHIBITED SEAWATER -REVERSE CIRCULATE 189 BBLS 8.5 PPG 120°SEAWATER AT 162 GPM W/500 PSI. -CIRCULATE 5 BBLS DOWN TBG TO CLEAN BALL SEAT ON RHC.- 01:30 - 04:30 3.00 RUNCOM P RUNCMP ,SET 4-1/2"X 7"HES TBT PACKER PER HES REP -PJSM WITH RIG CREW,WSL,AND HES REP FOR SETTING PACKER. CONFIRM NO PRESSURE ON TUBING AND ANNULUS AND REMOVE HEAD PIN FROM •TUBING. -DROP BALL AND ROD FOR SETTING PACKER DOWN TUBING. -ALLOW 11 MINUTES FOR BALL TO ARRIVE ON SEAT AT RHC. i ;-TEST TBG TO 250 PSI LOW WITH 3 I STROKES FOR 5 MINUTES. -PRESSURED UP ON TUBING AND SET PACKER '-CONTINUE PRESSURING UP ON TUBING T/ 3,500 PSI.WITH 24 STROKES AND HOLD FOR 30 MINUTES. -BLEED OFF TBG PSI TO 2,000 AND SHUT IN. LINE UP TO PUMP DOWN IA. -SWAP VALVES AND TEST 250 LOW FOR 5 MINUTES WITH 9 STROKES AND 3,500 PSI FOR 30 MINUTES WITH 30 STROKES. 1-CONFIRM MIT RESULTS WITH WTL AND RECIEVE APPROVAL TO PROCEED. -BLEED TBG SIDE OFF. SHEAR OUT DCK VALVE-SHEAR CONFIRMED AT 1,600 PSI DIFFERENTIAL AND 5.5 BBLS RETURNED TO TRIP TANK. CIRCULATE 5 BBL SEAWATER BOTH DIRECTIONS THROUGH DRC VALVE TO CONFIRM SHEAR. -84 GPM,150 PSI DOWN IA -84 GPM,90 PSI DOWN TUBING 04:30 - 09:30 5.00 RUNCOM P RUNCMP FREEZE PROTECT WELLBORE -SUCK OUT STACK -BLOW DOWN CHOKE AND KILL LINES -PU LANDING JOINT AND RIG UP HEAD PIN I FOR U-TUBE -ENSURE PROPER LINE UP ON CHOKE SKID -RIG UP LITTLE RED AND PT LINES TO 250 PSI LOW/2,500 PSI HIGH -LITTLE RED PUMP 153 BBL HEATED DIESEL DOWN IAAT 1.7 BPM WITH 300 PSI Printed 3/24/2015 2:36:48PM • North America-ALASKA-BP • Page 10 of 11 Operation Summary Report Common Well Name:09-03 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/16/2015 End Date: 1X3-0161V-C:(4,008,268.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud Date/Time:3/22/1976 12:00:OOAM Rig Release: Rig Contractor:DOYON DRILLING INC. 1 UWI:500292020900 Active datum:09-03A actual @53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:30 - 10:30 1.00 RUNCOM P RUNCMP U-TUBE FREEZE PROTECT INTO TUBING -LINE UP AND ALLOW FREEZE PROTECT TO U-TUBE FOR 1 HR BETWEEN IAAND TUBING SIM-OPS-CLEAN MUD PITS IN PREPARATION FOR RIG MOVE 10:30 - 11:30 1.00 RUNCOM P RUNCMP RIG DOWN FREEZE PROTECT EQUIPMENT -VAC OUT LINES TO LRS AND RIG DOWN SAME RIG DOWN HEAD PIN,LANDING JOINT,AND LINES ON RIG FLOOR 11:30 - 12:00 0.50 WHSUR P RUNCMP INSTALL TWC HOLD PJSM WITH RIG CREWAND WELLS SUPPORT -DRY ROD IN TWC 12:00 - 14:00 2.00 WHSUR P RUNCMP PRESSURE TEST TWC. -HOLD PJSM WITH LRS AND RIG CREW FOR PRESSURE TESTING TWC. DISCUSS EXCLUSION ZONES,PRESSURE TEST LIMITS, SAND PROPER VALVE LINEUP. -TEST TWC FROM ABOVE WITH RIG TEST PUMP TO 250/3,500 PSI-GOOD TEST 1-TEST TWC FROM BELOW WITH DIESEL TO `250/3,500 PSI-GOOD TEST -BOTH TESTS CHARTED SIM-OPS-CONTINUE CLEANING PITS 14:00 - 15:30 1.50 WHSUR P RUNCMP BLOW DOWN CHOKE AND KILL LINES,CHOKE SKID,AND LINES IN CELLAR.RIG DOWN LINES TO FLOW BACK TANK AND LINES TO CHOKE SKID 15:30 - 19:00 3.50 WHSUR P RUNCMP INSTALL PROPER RAM CONFIGURATION FOR NEXT WELL -PJSM THEN INSTALL 9-5/8"FIXED BORE RAMS IN TOP RAM CAVITY OF BOPE. -MOVE 2-7/8"X 5"VBR FROM UPPER RAM CAVITY TO LOWER RAM CAVITY -CHANGE OUT TOP DRIVE SAVER SUB 19:00 - 22:30 3.50 WHSUR P RUNCMP N/D BOPE AND SET BACK ON STUMP. -PJSM AND REVIEW DDI SOP FOR N/D BOPE STACK. -ATTACH BRIDGE CRANE AND REMOVE ;TURNBUCKLES. '-BREAK OUT AND REMOVE FLANGE BOLTS FROM BOPE STACK -LIFT BOPE FROM TUBING SPOOL AND SET ON TRAVELING STUMP IN CELLAR AND SECURE. SIM-OPS-RIG DOWN TRAILERS AND ENSURE EQUIPMENT READY TO MOBILIZE TO DS-3.WORK ON MUD PUMP SUCTION/ DISCHARGE SCREENS 22:30 - 00:00 1.50 WHSUR P RUNCMP INSTALL NEW ADAPER FLANGE AND DRY HOLE TREE. -PJSM FOR INSTALLING DRY HOLE TREE. REVIEW DDI SOP. -INSTALL ADAPTER FLANGE AND TORQUE. Printed 3/24/2015 2:36:48PM • North America-ALASKA-BP • Page 11 of 11 Operation Summary Report Common Well Name:09-03 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/16/2015 End Date: X3-0161V-C:(4,008,268.00) Project:Prudhoe Bay Site:PB DS 09 Rig Name/No.:DOYON 14 Spud DaterTime:3/22/1976 12:00:00AM Rig Release: Rig Contractor:DOYON DRILLING INC. UWI:500292020900 Active datum:09-03A actual©53.70usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/22/2015 00:00 - 01:30 1.50 WHSUR P WHDTRE INSTALL DRY HOLE TREE -ORIENT DRY HOLE TREE PER WELLHEAD TECH AND INSTALL ON TOP OF ADAPTER FLANGE 01:30 - 02:30 1.00 WHSUR P WHDTRE PRESSURE TEST ADAPTER FLANGE -WELLHEAD TECHNICIAN FILL TUBING HANGER VOID AND PRESSURE TEST ADAPTER FLANGE TO 250 PSI FOR 5 MINS, 5,000 PSI FOR 30 MINUTES-GOOD TEST 02:30 - 03:30 1.00 WHSUR P WHDTRE I PET MOANSTV -ADDRESSURE 3 BOTTLESTSOFDOUBLE HEFT TOPER OF TWALVESC -RU AND TEST DOUBLE MASTER VALVES TO 250 PSI/5,000 PSI FOR 5 MINS EACH-GOOD TEST *RELEASE FROM WELL 09-03 AT 03:30* -SEE 03-15B REPORT FOR REMAINDER OF [ _ DAY- . Printed 3/24/2015 2:36:48PM III 411 0 d,^NNN N.- 4r Var Mr NM,- v 0 6 0 v NON-,. !!!!! WVmNmONmaM0)O4MO0 (p Nvvv0 d4ov.a1nv',v.,. aN NNNNN,0000dr rnrnrV —W O W.. W WWMCa0 CMDMC0Dmr ...WO W mmrm .V V V, V MMMN NN v 61010M. 61 =p ..... ..... ..... .0... 0.... ...., ..... . 0 o vaaaa vaaaa vaaaa vaaaa vaaaa vvaaq aaaaa as J N N N N N N N N N N N N N N N N N N N N N N N NNN N NN N aaaaaaaa aaaaa aavva aaaaaaa aaaaa Mai aa as C-a v 0 m! m.-M 0 0 V 0 0 O r 0 M 0 a 0WWW,. O r O M n N W r M O M a 3 7 m r 0 r a N r mama.- 61 0 7 0 0.-0 0 0 61 7 0 r ON M,a 0000 010000 ,00.-<- NO)c.iM 17 1•)NNN N a,c)660) O0i 10r rr 661 - 0mmmm 100mmmm .mmmm .mmmm .mmmm mM1OmpWOW.. 0000 0 W r n r n r r n r n r r r n n r r n r n r r r n n r r n r r^ r N m to m N N r r n n r r r r r r r r n n r r r n n r r r r r n r r r r n r r n n r r r 0 0 0 0 0 a v 0 0 0 N N v 0 0 N N W M O M '4 N v 0 W a 0 v M rN M 6 6C0000v tNO NN6NN � Nar m00M 0ar00aN0m 00L244440 aaNNM NN. .- 00660rr6mi Nr0NN a 00r—MMMMM GMMMM nMMMM MMMNN NNNNN NNNr6NN 2 rrrrr rnrnr rrrr rnrnr rrr rrrr rrr vvvv aaaaa aaaaa aaaaa aaaaa aa44Q aaaaa 44 0000 mm.M. 601m.YO. mmhmN .mmmm 601.401.60) mm.N40I mm J.0000.. MOOON yMjNNnO 0 v 6)O N My 0 O v100p 0 v0 v M 41 N N 0 0 MV... M 0 4 0 0 a.0 0 0 O r O O O 10 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6666.- 0 0 0 0 0 0 0 0 0 cid T;;000.0 M 61 0 4 0 f p r v 0 N N r a n 0 M v 0 6) V v N M 0 W O.W M V. O O O N r 0 r N 0 00 a M 0 00O N 0 N 0 O N 0 6)O v a a s 0 0 0 0 0 ,M 00000 0000C? 0 .N.., N.-. 64444 4614)06) 00 .00000. O N 0 M N a a 0.0 m a 0 v M m N r r 0 m M 0 r 0 N00) M. C G z a a0 0 N M M r r N r O N v 0 v 4 0 N v N 4 r 0 N N N 6f - 00000 00.-.- NN NNN M V'1 00 0rr00 n 1-0 W 0) O.-N v6) 4)4) O OJ00 2 - 0 O .0 m = J 0 00 M O 0)N 4 O .-4 z_ a pa 0 V! 2 2 O > 0 C 0 .. 000 Nr (6.-. 0N.m0 NNM N COD Nr UO m O 011 0 N O'mN ON 0NM 4M)0 v O E M F ° Fr, T° O N G° 00000 0��.-� NNP)1�)M a 4 N0 t0 h 1�nCD lO 00010, ...0m -- 0 .mc N O 0000 N N L Z am r= 09 0 0O r 0 m x m 0 8 d 0 0= 0 NO00�MONr1O6.,%Gmm...T. (n O 00000 0.-N0a ,-...--em a Ona O a vnOO O M0(41, 4)0610 ON t O O O N 0 N O N N N 0 0 7 0 0 0,07o, M 0 0 0 n M r M M a ,OV., VW a -00000 NN.- MM 644)610 rr06 6 00.-0 N 4MMrA 00.-NC) 44 Q ZN N N N NN W 0 .. C. 0.E = e 2'- W 21.1!2 ! .. 5',i; 24i p 7 f @ N V E.cOOW c'�a m .q u0` m = 0 0 0 d m C lL_ d Q& C o A& W=000 NC09 r.-m 0m mamma 00.,-V N a N1�0, 0MN v, m 4�NO Or 0 el el N : N 0 0 >0 z.y C 0 0 0 E eg.= CO 00000 0�.,.-.- 'NNNN �. .-N N NN0 a s N NN M1.) 644.6 00 0 J d C1 d t 0 0 N 0"W d dr,f 0..2 .13808.. 0 -O � '.v . . .rex C aCl�'gC.c 2=0_- CD . V m Z Z C C 0 0 0 cp 3 m n p p a 2 10 >, N>d>4. 12co~mg2zc�,23 1pp1pp el t >000 0000 Ommmm mm..1M6 100100..(O 1r0016W 106 tax 1M0m NM 00m 00 61 100000 00 0 0 0 0 0 0 0 66666 m m 0100) M 0 0 0 0 m m 0 0 0 0 0 0 0 2 0 0 0 0 0 mm .-N M400r O vN M V^tor WM N14V N 41n ,...0v 0�//, v . N N N N N N N N M M M t h W 7714 M 71 Ot�ii N=,M00oammmMM... W M OO ,WWW. OM MT Oq .mmmm mm0 0OMMMrn a jONa0V N XVa14r p0O'N 0VN0A aWOWMVa" ra4 � MO LLa • NNNNNNryNNNMM MA Y o 0041 IM05 N 7 m Z 0 0 N V 0 0 0 0 0 0 00000 00000 00000 000000000, 00 3" O 0 a aD 3,-.00000 00000 00000 00000 00000 0000, 0 0 0 0 0 !"'^9 oa C m r—O 000 'V Q Mr V.V... 0m 000 COD00 N r CO, 0N0n 0 0 C�' E ON NM N N v r N,-N N N N .- , ..t.0(0, 0M a n a m,>w c.' N M N CI g11 m ° ,^0 0 0 2 0 O O N n r M M r 61 0'0 61 0 28',',32 0 r n N r 0 0 M M 0 M 0 n a7 M 0 0 M a 0 C X000 MN 004 aM 000 000 N 004)0 ON 04) r 61n 6)0 MN N ,.A O N W*W M O O O G O O O O G 0 0 0 0 0 0.6666 00000 .0 0 0 0 00000 cid O h aa cei .0 G ° Q..f7 M O 0\ ggli M,0 m Z M N° 44 h m r U V O' R R O 0 2 N)0,0 0 0 0 ma2m2 6]a 00000 2 N Z Z Z-O N 0=00 0000 O 0000 000 n 0 00000 OOOOO 0000, OOOO0 n 0 CE e Ochi666 amaioia 66666 6i of666 66666 hof ofam 0161666 6161 $ P 0 0 0) 00)0)00) 0)0000) 00)0)00) 00)0)0)0) 0))F)0)0. 00000) mm 4 6 t a r m O•-N MV.., W M N N N MV..,N r W N O N o a N Q v v . N N N N N N N M M M M N d N. K W E C W Wy .. f0 S O�r@d.J2 >$t N N q0 0_.00 da $ ''C al01 O i 28250 =77.- g O 2 g 0 c .- c 0 .. c aa.¢ EaGVJ O m ocg is —2t7, my c @4212�i oy_ . . og3oacm ow � S U LL N S m Q W m F 0JJ0c7> 0 K 0 flI yDeVV<oaan 1p rrl0 avOD 411 aN NVvrN NONM0, MMNmO«MW MOMdOmOrNrrQ,ONMOO N lO Ar MNwa Wandw,-tow wfnWa vvv aaaaa14,-,.‘414 N NNNN NNNNN 0 'oo00 6.666 r nrr,r vv,,O W W w,W ,MO W fl NOw rW ooN wmNMM ONO WHHb N MWO a0W OM MwWQW ANWO ppWO on, WWNNWam.° n.rOM M. ar onoW,MM,, NMM M VaaOW rO Q a aaa a V v a a Q a a a Q a a a a Q V d a a Q V a d d a a Q a d aaa a NN N N NNN N N NNN N N NNN N N NNN N N NNN N va avvv< a66WW ... 66... adfo... ao occur mmmWro .6...aaa da aaa W^W O N Nm w W a N W W M N a W N W V43,43. W W W W W a O N O N 00,M0 N a a N w a N,W N W M W W C W O n M a 0 W NMN O 0,4000 ,p h W r M W Paw O M M V a 0C4,00 O O w W M W O M W W A N'- M M W w N O N O7�t4rr W W!D .6.6, 66 ' ^A A r .64.. WA n4..r .n.rWr,n N W MrDMA 464n. 644W AMANn,W ra 46,, •06,,,,Aowww Oowww wwWww w0000 <17oG1 WWrr, wWMv,ra0 ,MOnM OOMWW MMONM WNWWM 810, WWW WWNWn NnArr WWWWW WWW�O MMMNN N nWWWW ,WW r WWWW WOWWO OW 1,-, n,,,n A r„A r r r,n ,r A,, „A n r r,n n n r n A n r ,nnr r „n A, r„A A r„A, ,r, w^A N O w r M W Ww d O w O O N.O,0NMN.-10 M M M W.- W W W a w W ONO N 100,1414 W O A,w O M,O r M N w C_4 w O 0 O A V N O h O O W 0 rm.,.mO o O O A .M a M w N M W W W W,arrmnm W O W M W N W O W a N O n W N L ,6666 NNwAAWOAWn0 .4.n. 4v6.4 pw�O OWldO asW WW,W wW 64.n. CN,lm Op 666,6 tarNN OOsWW OwwW HWWdM ONOM, WaN,w MWaM, WWaM ,NWA. 4 nW'Wa A a,OOOWas aaaaM MMMM NNNNN OOw2 a a a PW aaa a m Q a a a W aaa a .d.a s a aaa d n ol wa wa m m m m m d a s a p a a d a a s p a a a O W w w W w w w M w w w O W W W w w w w M M w Ol Ol M �01 w w M n �w M M��w O O..w W.. O�OW OW OOO O W W W W WOH Oyl yl WO WOO OW W WO WOO W W HO W ,OO W J O W O M AMO N W w ww W W0.00 ‘-11,-00Q, M,-W w N O M N W O N M a W ,W,M O W ONN 0MNO U)pp0W ....a WWOWO W m0aO .-WOOw WWO0O000 00000 06,,N NNNNN NOO,O 6,060 60000 0000 ,GMM M nn, • ,1=10'1.03 w,W N w W M a a Q M d O n ,,,WO N War W N O,O A N W M M W W O M O W O W W a M w W W a a N 0 N O ,VO w W W N, M W O W w O N W N M 11.01,‘- 0wWOW n w a a w M w W M a M 0 W W O M,W O a O N W O W ....4 4644O f"O0r ...4n OOW6 6,6 rN W,,MM to 6,66 4000r Mro'm NM m M(4 W, O W N W w N W w N W w M,O d A d O , 014.7 7 7 7 N N N fh f? v V9 9 T 4 f4 r r r CO CDN WOI OI OI 0 0 0 WZ m W W a W W W a M M M O a e w W N a MN W w O W W.M W O M,W O W NOM, O rMl M N W,-1-M d W W W w0a N M W W.-N M O M Q'O0M aVNNM NnwWw WWMWP WOA WNO6444444r WrWwW 6OnO M '.66 OO6rO CN . N0Mwa DOONW NMN644wN OnrOW 00,w6 NMWWW YN )) WWW,-M WWN. ,NN '1"1"1"?'? h MfeI' '4,99fn W m O_ N O m N M N n W d er r 0 n WON W f0 O M W d a W M a n W N W M M a O n W W M O w O N W f0 m O O N T fah N W n n N T m ONi m, O W M 04143s-, d M W O r Yf W O N W O r T N W r m N W r N a r W M W W, w . 6.. rmrr rN W O W „ On. 6 -.66 666.. M,M W, 66.6n AM W,W M W Mwr NO W .W OO rNN WW^ M MMa W W r A W wO M O O c,I V r O a A a ur O w N W 0 M r.-a ur N W w M O 0100 V N NNN N M M a, V. .O W W„W COMM,” 000, N N N 6 =. 0.012:1•- A w a 0 W W w M W A W M M A W M W N r ‘--VN WV W W P W W a,d w a M w 0i menu). I��Owa OIM W nM ,Nw W O blow W M O�M�W MOn W W GIN.-O W ONa.-W V MMM W ,MQ W w W O Waw a0O Q .6. W r r r Cf) .6666 OI OMWa 4.64. W 1 f I W 66... W H f h O lt)1 h y j C W t G N t h CMf C Y,O w f O, N Mein Q N N N N NNN N N N M M a W O W O r a'^O W W w N NM W0,01 M 0 V O N W w M r 0 n WNW O ,. --.M N ON M r 0,W N N NNN M a a a. W WOO A ,O W N w WOO O N N M M M C W .vm MO,NWamvOr O V r4NdMd OVMmM 4Nh IWrm WmO W4WOwV MeN V V NtMtOp.,, 'COMW WC, oWW YfO M0 WMW mW WWW ,,c666 6TNOh .WOMN 6660MM... NM A M O 6..6 6 N O O N 1- N W M r V 'N W O f p N.N c N V W r 0 O to W O N r O W 0,0 N 0 W O d A V W_ W w N W w moor', O a .-4 W,O L N N N M M a, V.W O W OW,r, W W W w w 000 ,NN to p 1pp YI S IO OIO WOO W,.O,O W N ,W MN M Orem .1.,‘-NO eaOmO Mr m V N ,OOM M 0.0,0 ‘-121,,0 ONA rO 006 H G6 6 6 fD OI6 W W w w0 O,OM 6 mmm dvVMpj ri0 C 00 ,-0 W pp O M OO W M N 'M 66 OO W 6 ,MOO , 06WMWOW WWWWw WwwwW NNMOW erOM WWO,W dMN WWW WMN W M,WQM 01,-0 HNOhNa " MOM oaWWOWWO, rArnnr0WmMM MMMVa .. MY . . HOoWW WWoO0 p WWW W W^O W W W r r„ W O ,N N w O w O V W O W V.-W W W N,0 0 W W O N a W O VON,. wd M a w (0.101010 W W W W W O W W W W O 02 N O W .-a O a ,O a W M ,,0301/4 W WO.-,. O w M 1410 M WWW M a N O O W M.000 N w M D OMN V ewO 0O �TNOmdnOM ,-OAmh40mwO MNo6.6o66aaaaaveva VaV aMMA NC,1,-011,00 VDaMM � M VaVYp , VMONNMMM ONMWWOMMVa a ..NOM ...OW OOW0 °WOW, nmNrOOWri OMAO ,WW d Cl^0 0 0 00000 0OOOO 00000 ,w r O O n W A M M ,W M W 00,001 M.-W,W n Waw W W O , O W W.-w M A N 2.-0 0 0 0 0 0 0 0 00000 0000 W W 0 0 v>Cp a N M N O O ONO M .-W w w W O« N N NNO ,MOO N W N W F 4.6 6N NOi O rn 4066,n m r6 Nr n W M.n h ' '.0 Y b 66h 0 aft0 ON NO O ff1 MN W M .WWW, ww W w NNMaa fray frdV aPa NCrdfeda NNNNa dvvaa OaMN �O aE M .-NNN N N NNN N N NNN N N N N N N N N N NNN N N NNN N N N N jC rN N N ...00 WWOO 4m0,.. W O,M O vv,.. O-PaW NwMW W A a a 0 W O M w N w s- ,M0 NNNM NNNOO OWWnM WVOMW wOWM MOMOO ANnnN COO 00000 OO.-NN ...MO aMMaQ MMMM MMN M6664 Mnn,n MNN . . .. ,,,,n N NNN N N NNN N N NNN N N NNN N N NNN N N N N S000 00000 00000 00000 LoppMO lrOMO,f0 Olvmc4wO COMMON WMMMW NmM00 0I,WIreW N'ONM OO www W W W OM MMwwM 66666 OO V O MMa 'r MON W MOMCO Mn W 'N W Mr Ot�N W m W W w o m m W w n w W W W w w W W W mn.W w NOM,. CC«0 0 w w W W n ,WW WW d e a M M N M��0 0 01.71113W., O O W V O W M M w 0 M a O W ,W w 0.- N NNN N M MMa V a W O A W ..WWW O.-N M P W W, 40010,N a W O n ,W050.- M M M M a st V a d a a V d d O O .mm.. W O W W W O O O W O W W W W W WW,,, A,r r, ,,,WW W O W (V 06 >. U O fA � 0 4 Om 0 411 0"N. Wmba. waWm ^6062 OW6AW N.rM6 : ::: M O rrrrn 4N.-w.r6 6Wa NMMMN NNNNOO OOOObA IN6COOAOOO 0 0 0 000NNWWbNNNNNNNNN NN 6666m 266aaaaa 44NmwMN.-mm NOWrO 66 mN666 Nm 66 Am.mb OA2Nl m , MWWWr b666.001.1.Q 0000 aaaaa aaaa 1.0002 282222222222 '2222''' 22II w awrnrn agaa41.1112 2228 • • WWW 2w rnW22W wwww 2222 ttVTp • 6 Z.W CON 6 0 a M W 4 4 A. comm.. 6 N M 6 .0 0 6 r W O N w M N M O r b M w.N 6 M 4W ©M O O R n 1.W 6 m O.-N W O 6,666 6 t6V N.-6 N W av-03‘-VV 0.-4 4 ,..ON )-O W W W 2 0 6 6-2 6 m W to N ,WW. 0.,-01 N 4660 6,:666 .-4666 66666 6^2106 66666 00,,NM 64464 64646 66rA6 66666 61646 3 W N. WON.).W n b .-6646 O 6 a 6 M N m m N mar M 7 M m V W m w b O 6 W N 6 n N 6 M r N O m m M A 6 W W Mm ,WN.m 6 6 6WAMnp MONO, MaMN OwwNW WW 6.4 ,MW., 6 .m6 MOMMa 466M 0.. 60 M ( 6:, 416 66AN6 a661 666.-6 666064666 .V6h.- 46666 1 .-666 mWh0000.. 6`66 m 0nnmm WWwNN Ma.Am NMa M04w abmOb 666OO V. .... NNNNN aa4 rrrmm MMMO N 6 0 NVMOW, 4..6 2 M 6 W 6 r 6 6 6 0 0fp N 0 N W O+I O OWN N b 4 W�A m N n N M N N.- WM.,. M A 6 w.- 0.r 6 z . ,WM.. a N r 6 m 6.1. 0,.)-V. a W 4 b 03,-0M0 b O VOP. N O . M m..O w.-6646 66466 tp th hA mmmCcl m, 02)0000 Om''N NNNNM C496A'11.Va 6,60,(')mr 6200 NM649MP VVN°O, rCOMW4 M000,- C1"1".' 0000 N'•INW , , , , , , , , • , , , , , ,N N N NNN N N N N N N tV N M M rl .C"'M M (`7 NM MmOON W 0pM6 mNN�r 0OOONOON0m V202, M"`NONMAMV00EF20 0W6 06N.W O00Mr 02 . WN 66666 N6r6 66.-6 . 6466 66060 406.-6 rG666 mm0WN 6,OC6 66 O 244' 002'2 2662422222 20222 mt '2 200,2 ^N W023220,2 60 NNNNN NNNNN 6666M MMMMM MMMMM MM m O M0 a W N a M m r M.W.6 n6,66 M m 6 6 W a W 4 N ..COMM O a 6 2 2 2 6 m..- W 6 6 m2M 6G6 .-NOnb Ma6rr mON6 4N. 0.6.6 NMN. • 6NmVW 66 66666 66666 66,-66 O 66666666 6646 66666 b666 .6606 66tV n ‘, 66460 lhn O M rn 6 .A w N 4 0 6 6 6 .m 4 O M O W m 6 r 6 b w N.m N.a a M4 N A O w W m vv. 4...6 mm.,, nnrmm m W W w w 0 0 0 N N M 6 a.b n 6 W W O O O N 6 a M 0 0 b n 0 m 6 6 M W O 0 O O.- W N.G.'. N NNN N N NNN N N N M M M M MMM M M M M MMM M a a a a C T N yVj Smm 0N,V 0,G2)t,M W W(00202 Tmata W I�Om),,W 2mmhaOD CO<f4DOM me-OMiMCN9 NtGN1aNYI ,COMMO NO)-mm mvn2 N N 6 yyh 666r.:6 66666 .-6466 Nagaa 66r0iN 606667 06660 006 �.- Or6 N 6 n66N 6466 NtM•1 ['+1629 V 4; a.... ...M. WW,,,Or NMm m 04720 aNN M< ...W. N0,W 0 00mN N.M V. aaatp�W�pp -O N N NNN N N NNN N N N N N M M M M M M M 6 6 M M • N N 666.-6 f 220 , 6666, r 6604006 • 06666 0'a.- 6.-' N M CM M ' N� 6M6[ 60666 60co.-644- C60MMOe NNm1. WCON mmaV66O mr6 666bp64660 66600 mN66m 64646 <Nn.- 1.6666 60466 r04N 0660nmr 4.M. abAmw O2mr6 a N W6.a OOOWCOM 0000 00000000 WWWW WWWWW 20000 000 0000620 00000mmmmm00W00220000 COMM, W^ N m m 0 m N.N M r M O.n 6 .6 6 6 0 P O n O W 6 m m'b 6 M 6 m M 2 N 2 a V M m c-0 CC.-NOV b N N p n N w"-NV 6 6 0 O O W m m rn to.. m m m N 6 4 N r r r w w n a 4 w 6. M r 4 n 6 rn to b 6 m M W r a 6 W m w G 4.- 664166 6.-6•-to 64666 t' 4666 46664 66.4 Mo6ON 6666,: 66646 6 V 64066. 6. 606. rotop0 66666 O66mM bWv-4b WONM4 MNO WWW,, 66NMN 6to rrrM bA.r .aO1 4tG MWWmmm rm40m 20000 0000 00000 OOm00 WWWWWWWWO WWWMWW WW000 mmmm2W M r mmmmm 2222 M W.4 6924 4 6 6 W 0 m A-m M N b r 6 6 M A ,CONN, 2 M M W w r M M M W P M.. CO'6 6 N 1.6 t' w 6 6 N O 6 r a 0 6 6 2 .- M W c-m 4 N .6. N .- +f 0 V m ~ 4666 66666 p.:,-:666 OOm66666 0 0 66 m m 66 66666 6466 6664r: N a r.:6666 w 66mmm mm6 mm 26666 m66 WWw0 O N ME 6' N NNNNN NN N N 4 a 4 ^r N • P b .M W b M N O. M N n m O O O 4 N 6 b 6 n 0 64 4N. 6O6N. COO NM ON4. ,COCOON 27bAw 4,0NM NN..O WWm NN r..:.-666 66666 VVV .00rnWWW 4 0OW222 2220 NMm .. 0nAWMMCDMOMMmmmmm m242m mmmmm p=ro W M O n m p .r a 4. w V N N .0.V. M .-6 6 W a a O 6 6 6 4 'CO 2.-M a W m a O 4,-m m 2 0 a W M m a a 6 2=.6 ..M o p r a 6 6 a 4 6 ..f0 m m b 4 M 6 N.r W N M m N .6 6 r N w b N N 6 .O N 6 W W 0 a W w 00 66666 6. 666 .6.m 46r-:.-6 N46.-666646 41-.:666 46666 46666 6.-666 tp6h6040E4, 04^WM {pwVas . 00Wmm Oam6 'h0WOOmmNMMV0' om2p t4 0t . 0 0,,62 0 M .0m m6W WWWWW wwWW MWW2 2222 WWWWW 00O O O O O O O O O O 0 06 N N 2 0 U r i 0 iNonni vMm^mM oamo U rnd N ' Nts 'm'NNN OCG OCG O G O a N I�r n r n n n n n r n r r n o 0 O i m i m'(0m R ) 0) 00 `r°cmoo 0 1 j ENNN NNNNN NmNNN NN N • 44444 4 0 44444 0 C(0C f,)N M C a t ,N O O N V r N E m 2 g. g 22 22- NahV NC 'V(0'oiroo moo gyri V w i iii Ali N 2222 4404 N • 7:-_,r r r r i,7,77znn i r n 17,E rig !,:,H,-_,;ovmi_�es Elm ',rL-: !!m C sG 42 rotr A2 +fd e2NN NN 2 1 Hili m2 n n mamm mm mo�v m m�n C ori o�v m m(0m�G Gni o.-o No F. T Q Q `.V QQ Q N 822 Orn28 0 0 0 0 0 W ZN Vmg 24 2 V lC '42 L pQ6<4Q - oo,o,N, mNOOg mom Ch OQOm00 N FHW1 N r'2 ECM N, m 0 0 0 m mN oo Q Q ,Ig-, � � o (0Ro� 22228 mN 4p� M • "I"" .1:;%`”, n E R E ,:,Fr O�O� O g Rfz4 O 8 � IL II.LLZ p 0} F { O ;EV 00iN1E2 ,TR VgO OSumN'E0 gr; T 1 O?�>2OOm l") G Wil NON O N M O 0 N N O Z U?`f l i 6 U th 0)0)000 (0(0(0(0(0 (0(0(0(0(0 T..; e j0 UO O_ Z' O7 O O 0 N ti 0 Qpm "'.7.' 2� m (0222, om NN yam HE t ` Im mN o R(022 _noocg voi p�� of o Q 'm 23232 4 4 N m 2 0)N-N- 0(0 C -�N N D O (0'v'(0'(0c (0<ecv 42,22 m1 o — c n,N . o+ w e c = �n 2 2 Sq?ro o ,� c V . O 0 U Cr n nnn mm cl0 N OOOm z ` S w OI m0 (0 N� mm m N V m ,y�222NNN T i ` l` O W O f ONi m O N O t-2 O n m I O ro G m m dCo m - O \ -0' E mc>mmm (0(0(0(0(0 a (0(0 (0a r = N .2 ❑ a 0 #n 2 N t m a m 4 k • N d >- o mp> a'o Eoomt e e o '8,94;7- N V N :“.-7,-,22 V,"! m,�,,.C C C C C= cg L O 9 y�U U T,'0 o g 3..;15 m 00000 �mmmm 000 nm m2 o (0(0¢(0(0(0 0 m c ,o0 o ZF w 't m r3 Or LI-.> . y .O,t o K 2 aa/0 Wm y i'N .' ,2R'.:,; N (0 On O O c N 0 % Y m P EN NOmmm 00000 0)0 .2.4.1g O m00(V040 12 2 ~ m 0 0 m m m r 0 DO 0 2 0 0 0 i s,a 2 m N N E0CIU CIEEIS D 0) R S D 5 CW Mg'-'.; r otV(0 N r0'1a00<N mcm, U E oOOoOo �N ~ um N C NC nN N NtO °- 2Oi .4-z p Z N N N N N N N N N ry N N N O R 228222 ' Z F w G m 0 c O' m > ti ~' N A w N w J N c 0 LL N44A 2 22224-A o n :',w;=.. _ p Nt�o v m 2222, mmmrnm .4.4.447, 'm(0(00 mm c>m n�4 n J n J q 2J o< Lib N 4 o r 0 n c U W N C N N U O .. .. Ix� n�N m�0� ���N p � m yy m 0 O m m�N N N N N m 0 m 0 N m^ 0 0)~ N O a 0 a J N ii 5 N U W t C w p 0 E T C c o >> 0 .. 0 0 0 cv 03 a. ! \ — . / LU C/ ii re c0 2 t co \ \ ( \ \ CC ® CO a — { co ) ) / 2 § » { * 6 E. » \ \ \ \ j \ f0 CD c0 ID w o j \ _ _ _ }k~ / } _§ o al t f ‘n} - \ k us O. \ a'2 z \ .. / ( a a / \ ( ) ' \ - ) I ) \ ( 7 ! f 2 — a » 7 Co \ >- ‹7 / § i 7 } § } ® co m 2 ( § CO ] J } e ® } 2 ( , ce \ / \ \ k \ ;:-.. / \ j e § / CO• I = D 2 \ E E N. 5 E 0 LL < ■ 7 A - ) f < \ § ) ~ cc 2 ( ') \ § \ / .. \ co 7 \ 13) o 0 o / ® ) / N. \ _ E \ \ / E } > >/ 3 3 m co = < } (a TD / e / { > > / 2". 0 0 0 z / 3 i ) H o o < ) o ± 2 LU 2 j ± $ u z ± < o < o o < 7 iii N ce zH j RI N < & ce \ \ \ z LU LB < / \ ( o f _i < 9 ) 2 ( \ 5 Q c / o \ o w w CO ! } m z z ° o . R co ] 2 Lu a § / § t Co / 4 k ) [ f g.in° .. \ C ( / / •.. 6 .. , ! E k / •\ I _ k \ / „..0 a. { E \ \ / a \ } G a. z 0 = j o o / } ) } / ) ƒ ai 2 \ } o % 2 / j • 0 ) « Q ) / cm c0 4: on La o cv / } \ r\ 4 ) / ~ 777 / 0 0 z z / F z ) CID 0 ] 4 \ E _ � � e _ z to) _ — | ac L AI Fei o) .- e \ CL Z © .. & 12 'cOz0 -o Iii 0 Zi a) / f U- _ � � ` ) E Z• � La , : e | 3 z z : } » /) 2 i } § i ) / \ - as A ƒ / - / _ - / 7 J § \ \ ) \ \ a ) \ \ \ ■ Z. 2 / * « « , a % a { ! « \ 0 0 2 7 ± 2 * -E a § ' } { ' \ w 1 ; \ co \ / » E \ j } / j ) \ \ j / \ \ E E # 0 f . 3 2 2 2 3 « e ; _ 0 , E } o § -co 4 o 1 \ / e E ® G ° R \ _ « ) § \ o ) = 2 ui , G . g \ T /1- / & O a aj 5 , # f - 03 « E -0 § A a z a f 0 i 7). E \ @ F- a ^ Vi 0 .0 .0 a « « m% \ m -- E ¥! & « [ - �a � a " 7 12 ~- — w CII _0 } F- \ ) o \ �)CV Fco /\ z L ) 0 2E, - ( 0 ¥ 2 0 > z - z z In \ 0 / & J } \ / / o ƒ § § { ° 2 Lo E / § § ) cn / E . \ } \ / \ � } 2 6 ` § = 0 § \ f ) ~ / a a ® § •# » * - a) / - § / § } y & ± ) \ / ) \ \ \ co / / h / / f a. • • ' •Y c rp W O N H � ' 0 W m co C d O C I QQco L m0 c Zm o Ln Q W U`n m D C) U Ua a > ro ao, 0 N CC Y N O > J Ln W N V _ m m COm Q 0 0 >, o y y. o o e U' N o -0 LL O Z o a -o v o 0 0 0 N O OLID N 1 O^ t") 7 S O N 5 N co fh O r..... O X u/ N O O O O W N 2 N 6 N ryl V L Z 0 C6 N ^ o C c N E 0 O 0 W F- U o F� 6 > rn o F c W o - n r ❑ z Lo 1 E o °a 3 W o E ❑ H N d W Col 0)2 Jam, ,. CC U) Q X .. ~ 9 a `m ) o a a C 0 c[ cn 1 C a) 0) D ^ E C J a o U CO O -- a d J O m O V H co i N ^ n O )) > N N J a) M E a) 3 a.co N C d Y O a O ❑ Ic2 O C a co -iii co C Ol O C 2 U) O (n d w cK > C c a rn w O C c rn rn Q W .E N O E O 15 N X X C N = O L. `n 0 0 0 O O W W CO a. > Cm a) m a '° N 0 / vMi d a m Q < -'. n LL E CC CCC> 1a Z v) Y of a; () N /. � Z E U o • O {. ❑ 0 0 ai) Cl)) C7 Lc) co 0) ti❑ E m o a Z > v n w 1c o o a. o >, i E c E H o N rn ca ,_ w Z cn rx m x_ ra J. 0 2 H 0 o Q cQ 0O W W W 0 a H F D Z U) J W Q O W CC d coZ0 Co OO W iy H Zw Z _ 0 u) aWLL) LU O z W Z F H fx rn jH O (:� O J < W Q 00 00 '� CO O c to O O J U) O CC W W M 7 M W C) d ,- N co N o W 0 Z' c m` E r EILu a co m z z p w Z coN OO W O Oo d G al E c� Z f W O N N O) .. V �,`" T v O N E .ii eii ami m o) ai /.. 4$';‘/;•"; / o a o O d > H m E a aai a O U N 4 U) N E a� c ami ami 2 0 ° co H� > > >� o c 0 0 > o > a E E o s .0 0 2 a o Y a n o a 0 a W 0 > > v 0 a ce c[ LL 0 's > cn 0 2 0 0 0 0 0 !U i 3' 3 '6 -6 a err o cLi. a m N aS J a2 a -0 U E H o Z f N 2 m • C) YO a) U - m Z z m - aco 0 0 a co o r- a) L a a` -- >. U w o p asH rn nj 0 ~ N N H N N H N EL > > r) 0) Ca0 .O Z in a m rn a F o aa) N 1,---- E a a Z .% U Li 0. S m oz a r Z OCCO c 0 O Li., p I- C J a �.a W (0 a) a r a u)'¢ X W LL O o d c a) E m S Z Z fi« w a a E 1....i. m } E O Z N NN 0) LL = a C O %/ N N 7, o I Q a w a = o 2 m CO �i a) a.,%) C E a U L a N a 3 a O C 0 O) d U) E ) ~ C W O °' .a Y6 a m a N N O O U 3 0- _ a ; � o � � � U +' Ic, m E CO E F o a� E E ° N o E C y p } 'a X a Z H U U rn m 0 c C U E E U m a a' 2 E o O a CO E o `1 G1 m m E 3 U E 3 t c m o 0 0 o p V Z N O ›- U = H- , 4 CC 2 H ao Z Lo O} el a) o O o IDLc)r/ j o O _ � N 0 1 ?, WO EUN � %• 1 INz a a = w d w7 m O m ml as E -c 2 a z r • a 0 2 - a o d 0 • `` .0.. - O) .0 _ FO- O N U) co ce < v a E �2 ' M is a � F _. ^ _c 144, g U ° P2 a) O J EE O N a) C O a) O F - o c• E O =m 00 m N Cl. x a J .. C 2 OL I O 00_ J O W a H O S 0 O C lf) O a) a maw. E p >F 00 y N ;'% ~ . M Q o ee - Z ' N • 1 W co a el % i O E an o • f6 i I E L 10 0 w > a o 1 .;7).- ^ ce w z z z L O ? 0 - o w 0 a) a) m a co ' Z Z >a, H H w C a) 2 '..O 1 O J H Z 0- O Ja) W C Ln u N • cc x COU) O W O . L�i.I a) m c p O a/ W H O U) U a U a) J _N as 0° 'w O rn >- n 3 } c 2:w p- o I NO a a a D w Z' a)›.. JO-. 'o O U.,H a 2 113- C • m C 3 O c EE <1-1. c C .. Ol J a a) a a d Q (n a C p '',,�i O as a) 'O "O a s a ,.' C U a W U ',7 u) c H 2 E aa)) m a o w o 0 ul H H U 0 7 m 0 col- S • • LII D W p nL' m w m 0 Jpri cO_C O Q LO CV o !. rn O O O X a) _o Y Z a) •-• O CO CO m J f- ! N. U o -0 LL p — o -o v o 0 0 0 !�)O o c� w 2 N N 5 N CO v o n a F ie as a a o 0 0 0 en N N 3 L N UD N- ▪ N Z• w V m N N V i O C C D1 C N - N J N e (7; N D W N G a) 3 , —c ; cr Z U) " N O 0 D W O E 0 ~ "Q cn Q X H a) .. -p a) a) o a CC C Q) 0, ^ E . D )" o U iJ O coO N Y? Q O co CO N 0) N O N RI N > E N N J i.--,- r) E I N a a) c _ N a) M QO > CO5, d N O , . Y a) Q) i+ N N c. Y i- Oo N O C O) O C � (n g 'W � I0 ° o ';--- COaN $ I id R N O N N U U Q O E O a) X X 3 > et 0 7 C O m w V 0la +a O � - Co"; E 0. m _ E E , �' U" E a LL Q •C U K W V 0 cx,"� u-, z Q -O N O Oa. 9 Z N N I O • u) NOI C) E c U6 JO ton O) coQ I a) aN cn a)a1m E E an ai m 0, - U fn fn d' Q O a) a F, o_ E F I- N E x a o co a) v r o C7 0 o LL W Q < z - -J w z o LL ce W d 0Z _)c N Z J j Z N o .Y 0,z Cm - Lt -n LU• WH z mHU w ? Q zQ o 0z M . Z C6 °J 2' CC W W 2' O W O J U) d «, U d V [n E y N Z O o O E W n Z N Z O N j B U a N E a) N p) a) > 1 2 a) N O U E E E m -o E U • C a O O .. U N > ~ a) E a N p a) N O U N N N C a) a) n r • o ° i o 2 E E a m 'a v Z a o a) w n a 8 a w 0 = ' U cJ a CC LL in a > CO 0 2 0 o _ 41, i N U a5 8 al N C 1 Q L co asato ul3:"§ c0`1 H a S d 2 OD M O O 3 N U E U) Z Z n U 0 0 a) _ —/14444 1 ° o " a) 0 L a ;444-4 • HU m H i....co. O m0 y. 0 Ff 'W a0 /' a N C., 80 z fi 0 - H E " 12 O .."/ N 0 Oa a Z N O Z o D c 0 m /'' I O U w O H J Q 3 W a) co a LL O U) Q X U) D " W i y2 f d E 0 E N a c - co Z Z to O 'o a co Q Oa. .L.., 7 tQYLl ' .. a .. O ON ry o NJ 0NCO o uN C 6 E p 1-0 15 CD Z -a a) c v C ix m ❑ 0 Q TA H Q. CO a E C t)> r a ca,'> a) H O C U) ET cnNa sy 0 01 CA U C 1 n N Eo o) a U H d Z F U oa E .v m U E N d jp� o > x i- a`) E c co) E E V m a t.- 00 LO E Oo O cC 0 ss E = d C0 coE o U _o 0 aa)) o t V,`r Z cn W H d } U U O Z a' )n O o >- 0 o o O icn o m co r//f� � so O o m O w rn 0) ui 2'H v o — a2 -. U .N H co ai a U ; a m d F n Z V L r Z > a oo H ous O (0 o j' n n o Q UE-E- Z_ ~ 0 _c O 2 U O m CO J N E o Q C V a) O i/ c O d � U) H = m m N m x CC d Q c N ozi O a) m 2 O Cl O .,,,;,-',,O.,04. w O O S O o E N Oa) V H , N � ° E vi oD -0Z n 3 ro a LL, _ a N U) C N E n— c,, 0 E o O O 0 r ) O mZ a Z> a Z ZZ U W' Oz Ti w C a00w 0 , Na) `nZ OHH m g L 70 0oO z .c U m Nw NS 0 c oo u) CC cn g a 0 o JZ 0 n w 0a_ 0 cum O Z o0U N rn Os ',�Z 02 Y o a N N O J U1 '6 ❑ N O " N CP ? a' N C O ii'-;., c a a 0O O as LL ❑ O 0_ N N o "C o .. V O a J N a) Ti ai /) a U (a Lo Cl) O C c > > _ O C E o N C > O) O J a 0 a) 'O r 6, a s a O > O a) c Q .. E J E F2 U Ia w U E 0 m c o w o f U 0 > m o m H S 25 6974' SchlumbergerTransmittal if: 16APR15-SPO1 Drilling&Measurements DATA LOGGED iS MWD/LWD LogProduct Delivery5 i►ZE2 DE M.K.BENDER Customer: BP Exploration Alaska Inc Dispatched To: Makana Bender Well No: 09-03A Date Dispatched: 16-Apr-15 APIN: 50-029-20209-01-00 Dispatched By: Stephanie Pacillo Well/ Product Hardcopy Digital Copy E-Delivery Date Delivered To: 16APH i 5-SPO1 AOGCC Makana Bender 10 Contents on CD N/A Color Log Prints: VISION*Services 2"MD MAD Pass x x VISION*Services 2"MD x x VISION*Services _ 2"TVDSS MAD Pass x x VISION*Services 2'TVDSS VISION*Services 5"MD MAD Pass Quadrant Density_ x x VISION*Services 5"MD MAD Pass x x VISION*Services 5'MD Quadrant Density x x VISION*Services 5"MD x x VISION*Services 5'TVDSS MAD Pass x x VISION*Services 5'TVDSS x x Digital Data N/A Contents on CD x Survey 2 Contents on CD ASP Final Survey x x EOW CD 1 Contents on CD Graphics: PDF x Data:DLIS/ASCII RECEIVED x Survey:PDF,XLS x _ APR 16 2015 AOGCC Please sign and email a copy to: Please sign and email a copy to: AlaskaPTSPrintCenter(a�slb.com gancpdc(a�bp.com Alaska PTS Pri t Center ATTN:Merion Kendall Received By: II/ • ao 0 0 u - art-c,, N r w o m .-.coo.- n O-r mNV... OW N W 9-�VVV� 0,-VV,- mmNM- .000‘-V m poo o�mM� a mm . A 2•7422. a m N N -o m r N M M- o.0 0 0 0 aaa vaaaa aammm N a N v 3 aaa as as a as aaa as as aaa ' NNNNN NNNNN NNNNN NNNNNNNNNN NNNNN NNNNN N N Q UpIMM Q` 66666 OOOO OOOOO 66 OOO nOO 66666 OOOO OOOOp .6666 nO O O O O O rr rr LEI /,- odm NmM v 9 rO- Mmm iii IIj mm mIi IiI M ma aaw- uoaY . N . nNNwWum 0.00 . u . N N W /// J ryryryryry ! !! XN ;:;!; N NnrynN NryNrN ryaNaavv vvvvv vvvvv vvva aCI N^m 2 r m m N^N NnNuiNn mmmmmm nrgrg nrrrmmwww mow rrrrr rrrrr rrrrr nrrrn nnrrr rrrrr rrrrr rr m^N N 6a- ...r.“., -O N N m p m .-bN mOm arm 0 .v.-mos- N M C(06m6.- -m N Ama ▪_NMa NNN NN- OnN r fl NM c' , nnnnnnnnn " N 0.0N orrNN rNN , r Z XXIIA m a m a mII .....N N N NNN ..... ..... NNNNN h N h N XIII; . . ..mIII .. ..00000 ..000.- MoN,til. 0.4.0..Nn M.-n.-0 ea0umi0 0,-0- 00 Oo 06G 66666 66666 00000 0000 0-006 00 00 '000mp m^mao 0.-00. r-m Nmaor N -Ow a-N m VW W,tr. N N-a -0 N - - 0.0.-V --a O m M N a ,m O O 66666 ..N-N N N---- .h Y<a.j 4.66.'6 w 00..... ON mMm a0 m MV..-. N M r0- v0Nr N --O N0 0 Q F N ;::::: warywmrrwNmo -NaON00- ri .C1ina6 CD ' ' ' '777 c. 'TO n 'Nr.w NNrrr0 ^NNmNwmaMNr0ccom .0 .00m _tttt0-- NNMmm vamuiri rnao m "oioor.vi.o a o . -- - -- OEo�Frr° O ° mN„ Z,000m .= zom mE NCKNN-.eSNwmm,6. 0 Q^o O 0w 0-N a ..-..-VM N- M a O'a 0V•-,.. -n O m O .MO m w b V_„0p0N ...NW -n- OmO 00040 mrO Oar W a 4 66666 -NNMm MONNIO nr666 66-NN 466,-:K 66.-0c4Nri NN W O 0 .. 0 y , O q« o y w f o f u co g D n NE O1▪ S gm yv_Y 5 D..E m V ESO o^jjj E o 10-T1 - 114 0.. u4 m U wwC C A LL O Q r l , A m DWx000NM n V m-Mb w0mma. 0 0 W 0.N2T,',2:!7: iV0N W Or 0 01.11 Qw CC 0s Y" 600mW oN 00000 0- -- -NNN --- 0thaaa NNNI17 .iaaNN m.n �HHm4.mw Woo _ OLv` =1E 0• . oKKccO2^. cc U O E zEt.. 35,7";35 : . .;; aa,2agfaf20,22 a T co '(? h N n n n n.m0.m0 .mp 22222 22,';V,; ,';2222 Iap IMO i0.mp m w b N h m 0 x OF 6e5666 N Omm m 0 m .mm6mmmm mMmmoM 66666 OMNbo�om. O0O0000wmOOp O 11111111111 = 74 - irwmo ` 'm. pNMammon . MM-.-- . -NNN NNNNyNHN N 4 \ / 0 N E o 0 0 0 am... m m m m m m w w O000OA m 0 m 0 m o m M 00 0 0 • .75 0_,.000 66666 mm6m N mm mm0W0 D O 60401.5 (Cvi.nNN N N Nh!N N.I)n ANNui!ic uitti m -N mONm! w .- ^'.m^ .-NN NNN . W 4 -.- N NNN NNm MM W 11001N=.m0 Z Il'-, m O N 00000 OO f® ^0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a00.00 0 0 G 2-..... 0 0 0 0 0 0000C! 605664 00000 OOOOO O O O O w - O COO N 4.6e46.- 6 0-a- w m.n 0 a O w w-w w .0 G I V 10 r M G N O-0 ~ N N N MVV., V.V.. m-.00.- w NNN N 1�M^N N N m m m r a -N r E M N N - N-N - - M N• 0 =a3 o W :'(N�(w ' C511 17:0000. 0004 r r 0400)r m 0,.... ON n r N ,0000 r M n r w M NN 7 NM 40 00000 Ia-- aMM-N N-NNN n -mom N.m wN M 0 onN05m 66000 66.666 66666 66666 60000 -0006 00000 OO O m 0 C , 7-';r,1 n° M 0 • ¢mQ-Oro 060 O O O N O e M 2 r N m 7.a 2DSd,0No, NQ "06. a 0 a O p o o Z 2 2—6 N O 000000 00 0 0 0 0 0 0 0 0 0 00000,NN0 0 0 0 0 00000 00000 00000 0 0 OS w Mmmr mmmmm mmmm Nmmmm MMMMM MMMM0 MMMMM mom 'yQ, C Ma N w r CO...-.- -..m r -m NN N 0V.., N NN.ry NNN.. 0M N A - l 6 = 65", g u K C N 00 r C EiJ (V Q. a q p -p o w u U_ .u. N E« C U LL A A • Li A G .o a s YS C C Qq1 t43 .. 2 t >yw OT$� 9 F FON E C O.0 9 - C C C `o N 9 C E W M ' l:› u. u u o o. > > o 0 0 o K c o o '- A ltr5E Vl3mQNmHUJJUC9> 0 K 0 • • • 0 N N^W W U) V«Mo WmW NO W r N M m O''0 .M 0)m W M N W W NO N 0 n A T W N[ M T Na OAT oMMWM MOVWN ,QNm OnWM O«NW MNWnO DVOOA ON«N2 'M MMNOV NVNNM WWNN MM'OW WAAW V Q W 2 N N N «« �6A6 : MV MM«WTN MOOOO M2 2 62 OWMrm AWNUa Hh«WV NNNrN 8 3 22 2 WNrA« 71.4 MM 24aV N22gA MMMN NNNN NNNNN NNNN 42442 NNNNVV ;VVVV VVVNAA NNNNN NNNN NNNNN N N NNNNN NNNNN NVVNN NNNNN NNNNN NNNNN NNNNN NNNOOO nOOOO CGC00 �0000 0000 OGOOO �OOCO 00000 CGCOOn"� OOCCOnnnOOCCrnr rrAr Ana r cici dQ(a O O d e O M n W O 6 O W O O T W m WOW� A W N W T A W T W O W W W T W N O O W O W V O N M O O N L c V M W WW N W 6 NW l'O W M fmO V)N0� r W NQ�M O W O N E M E N «V O O M O W T M M W T W M V T T )O N O V m O)N n « N W« .-V O W U1 A M W W A O N W A O W W W W N �O W N M W T W O S W N r pN2 M 22221 NNA m A WNn23232 NN 022hN 22222 M2NW22222 m W A A« nTAWV7,2282 «O T 8 N WTTAW 2222:1 r VW«W WO ,75018 Oi N C N NNNNN MMMM 6vNW NNNNNNvv.*.NNNNN NNNNN NNNNNNNNNNNNN NNNN N 060363avavvvvOvvvv aavav vvvvv vvvvv vev4,44Wm vvW6v0 (0v( 0( vv(0vv (0(006 N W�oW"^WAWrOTWAOWnN) N«M 0 V W V N 2 N M 2A,822 aONW 22222 WWWW N M N WN T O A M O 23322 66NT «N N nM W N W�)AW W« MM 0«W0AT0NN 60.- W? rm 6666Oi Ooir: W« NMnMV rW 4 «WOUG o> WWW RAoM000W0 2WWW0W W0W rrA rnrrr rnrrr rnrrr ArArr rnrrr rnrrr ArrAr ArnAr rnrrr rrAnr ArArr Arr LWW^IAT NON O 82228 nMNW T TAO O 2022,78 tNW«W 28222 hWr0 mMN«W 22222 MTW O W A V T 22222 rN6N WW6Mm� N O r 22222 MnWA OOOC OiOWit)T WVNNN aahrT W VWNN ONWoOmmo rWWAMONO., WaNT NWWaM a «TA VAM' N W 0 nAA WWWWW A66vM NNNN OoTTO Z mmw vvvvv mrnmmm "Iv" "'XI IIIA' vvavv I"I"" I"I" 'I"' """AI vvavv IIIv 202 NNhNh HN(l Y1N NNNNN NhhM W ...22 O000h .2.22 hNNNN 20222 222.. NNUTiN. N ON ng-82.g, NM 6 T 287:382 000O m W N M 0 22282 'O N N W 22242 NMAW W a«r M 222',32 07 W r m W 228 WO 00000 00000 GC««N mbUNh 0«000 00000 00000 «OthMM thN« E-24°,3 6W Wui 82222 AWNT McmiAA vAAin :2127,0 n--2- QnWW NT6r W 62207- 22222 WMMW 22;22 VaO W2,2W A:2228 Mn V NO rt-moor WfpUj6N 7ci1',tNM �WNm6AN . 3aovMeNNW WOO 0,0WN««O 00.60, o N6 7 77'. •Mge1- v W m t4(4 ip r:r;r;aQ OpT T 00 2E:222 0MWWA 22228 mMOA V0NNA 2',2282 22222 WNNW WM«Wm 8:2224 TAM0N _«M A 2222:2 22272 M0«N 0 6 0 Q NaV 46476 WoW WO N OOlN* ON0� 00v60 N 0N • 0 • • • OrOOONVN NM AWmmo 0W W 7 ?"'")4 YYYYY Y"l 7 . 9 v"4W '4'4'; Q 0 O 0 0 NNTrNONN- 3,7„1::::?, VWWNW N«OOW6 1226r MWWN 2622N �mVMm 20ON2 INT o66NUm 66666 M.-ONO 0000W0 0C NiATWO )OWW "0N O---( ( N 6^^A0W NNNMMaV Vm0W iNWW 0Wr^rnm OWOMWM 0 M 0 p O) 0 N 00M0I M 0600- 0 T00 «W W 0)N T W A M r ON W NA .- ^M ON•O( W 60 W Or AT OMT 0M.- 7U) MOr W W (-U)W V W AMMM W 6 W T NOT V T 606 a N N N N r r r a g N N N NN N 0N 0 N mW-A U AA r al co m U N W M 7 O NNM 1O66 U N o W 6. O W N 00M NNNNMOAWN AWNWO 'WOMN MMM^^" 4 NN N 6aVN WWWr AAWWT T0000 C T <0 m U s o r 2 227'22 QWa0A 84'472 rWAW 4'8224 0WMOMA.2222 aWr MO WN O( o N O iO VO 2:2227-'A«6 W« W0WT 0 N DT 42228 N2W0 0)6NON 222 cCM 0W NN mNWWW rrOgo tgg0MO NaWO ;1, 000•-‘- ..... NW O,O -0. .'. NMM66 V0000 WWrrr 0WTTT 0O ' '^ ^ g V N W W22222 M mHN r N N N W N 22222 2222" TWTW 7AWOO 4;228 22,722 6«00 «WWWW 82328 NVNW 'WNrW O NM A T x)00 m O om T M O m W a«OgO0 W W M M0 h iO W W OimTT mmT MMN 2202W NNwN0 «VrOM WTWrW 6MNOM WWmMN 0,W0 VO MMM MWTOV vvVvW ,WTmW NNNNN hHNaV NNWWr 220WW WWVWW ,1-2222 r22n^ rnrW T p«O 222 W E m m m 20P;222 r 22,';22 mmT W TTWN 78222 A«T m m 22722 N«OO O T WOO WWtO WW)D 22822 N6W2 42282 WNrW M vT M 6 TM NcAmrNW Oa . . 66 6u36 3,14vvuaiNoN 66r6 rvNNoi 66eim6433 A0161 36 AaVMMA2W«6OMN«Om)hWM2 a2 682224 23222 ,0000cVa NNNN UNmN rV sEoo0 00000 �0000 2228S 7-2t3:22 22222 .7.,3n22 omon ton mm 2387:2 N6NNo 2222nNmrym 27-6H 66O OONTO VNOiN 5MaiN iI:OgN 66666 r`0 W aO Oi OON W m r-CO yE 222 7-NNNN 22'" r r r W W W W W T T 227,7,2 N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N N N 6 : 0N :'12,222 Nh N M NNNN0 2,43222 A0rM O OOW M V 22222 WNM« MO.-MW 01,10';28 v r W T O«VA0 2822:: TTWA A 6 O nm 84'222 TNN« r 7.22 M 00 OOOOC CO.-Nm N)po66NMMM N6 NNNN NNNNN NNNNN NNNN NNNNN N N N 00000 0 0 0 0 00 0 0 0 00000 «0 O T 0 A O W.-0 M W n r m W W A T N000,- W00,0 TAA W N«O O A r W _.xr rnrrr � rnrrr 00000) W T0AO .00N0 (0MMON W W MMU) «MOO M«W 7-T «OU)M 000 Dvi OmTTTaTMMOi OooioiooOg.-oicge Drci Ogci Ogeiw - r.:•-6.-6 ommm ) TT TTmmm NMU)WT N0ON0 cdTWWA ,00UV aaMMN 6«. 00 rWA 0ai 0ui0 0A2MMMO« 4"4422 aAAO« NNNNN NNMmV 0mmmm 2 2 2 02 tVWWAW lirrN r6222 ^O« 228 n co N T W 0 F Som o • • 0 oro., 2 W M e N W Q 2 W ,W O M e Q N W 7,O M E MW r IX/COMM. W M 7,2 2 m 7,2 W M W e M N07,WWN QE7, 2WMOW aW7,Q0 7, WN2QW QWW .-OM2 EO r27,W2 NONWO WNnOM 7227,2 2 g2842 20224 12221 NQNmM 7,222e 22224 r4 e4 0 7,222 0 J 00W Q0MMN I E E E WmmE EN7,0r MMQNO NWa NMM7,m NN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN !!!!! mNNNN N N N N N N N N N O rG C O 2C 2O 2A 0,6000 22222 O O O O rO C 2GO2O 2O rrnrrG C rC O rG 00,600 O GCC C 000,60 �n�O O p JCCC^O n M M U e M 2 W N !!U)!!! WOMNW7, 2OMNOOOOO NNNNN NN N WWWWNNN WWWWW NNNNNNNN NNNNNN N N NNNNNFt0ew aMMMM VVVaV VVNMW WQVMQ 82422 e.1 2 2 182342 22422 MQ«NN23222 O N M Q7,W 8234 h�gM rr O 2N 2W M g OE WM 2Q NM O e O W 7,r e2 02 W2 O2 Oi O NO n N N O r M O N WWN mN MWN O W`W2 22WW1 WWW2W WWWWW OWNpW pWpO2 WWWW72 NW<V4 WWWWW NWWW7, 07,EWH 22 , rrnnnr ,2222 , rnn ,22 rnr nnn2 ,222, IN rrnn 212132 88122 ECD7,17, 84232 nW2NW 22222 WMNW EOeWr 2.7-'422 NWW2 N r 2 N r 223.82 nQ22« 27,222 mNrr 'W W r W M 72 Q.-N N e N �M M O O m W M N W Q O)W M O 2 nN W W 6t-:06,4 O r N W 7,N 0 rNnW 28 2 2 WNrNN 44442 WMM2WM WMrr WW207, QWMNm WMNWW 22222 El2rN072 NN0Q0Voooo000 00000 00000 000 v0000 0000m mOimm2 22222 mmMEEEm MWWWW mom.,eeQep em-wee MMMM mC MMMMM mmmm N E 2222°8 22222 22222 222N 22222 22NEE 2 22N2N 2 22222NNE HEN0)N 2 EEE E �0 y^WN 2 0287. 4222 2227.2 2ee8 2 222 2E WnNmQ 22247 )hNON 07,8 7,m VOMOr 2 222 8 2 0MuiW0i 2 O0 OrWMM NNNMO NtU0 00M CQQOQ 0 M Q M'Q N M N n n M M N M iD M M N e M W ONO t' W IT W n M r 0 7,0 N Q W M W N W W MMEQ 2 W O W O W VV-WNW r N W M r M O W W V O O m M ,WNW O W N W WOW, QMN ONrQQ OmmNm mmMNQ rmWWr WWW OMM nQWWM ONW 22 28 0' 47.7..82 N8O M m 2.^ 42283 2 M . 22232 O 2 2 2 7, 2487.2 <n N N 7,V N m 21:243 a o O 7, V N m w o 23242 m o A M 00 _. 7,7,^ ... . NN MMMMae 72N rrrW 20 2 r Z IN m 2 ON 42282 CO O O Nm Vr 22224 N�E'NO W4 M 42242 OONN W127,0 2222 24243 QNN7, MNNrN 24223 r N o 7,0 2224 SNW NN WQ pMWeO Wm NN 2002E 02N NMMW O nr 22228 8218 07,227, 7, MMQeQ MWN 7, !N7,QnO eONNr 7, WM7,MN NNNNN MmM O 1 ' ' ' , ' ' ' . , ' . m m QM M O o^`m N N m N W M W m W.-WWW WN nNW M N OWN,. O O^N 2 V mo N7,2� OUvi00 O � MW � NNOWeM'1 enm OroM7, mO4 � m<o� aoNM22 .-064m6 o 'G o 4o .-MraoGoiN N2opNM MQQQ4 4 m2NN WWpmQ W22n 22 22E 31ON7, 7,22 N 3220 � <rVM 44232 2272 NN NNNNN NNNNNNNNMMMMMM MMMMM MMM 9MO p O 00rN222322 2g222 22248 27-724 42882 2482.1 7-2242 21272 24422 '2222 82E22 8222 WM NtONh(C 66.-66 WMMVM MENW2 .,NMe2 0Fe202 2 82 7,2 rnrNQ rOMWW 2087,0 4 2 2 02 NN2nW W2NNWNQQMN2N7, 7,2rOmOW2W NNNN NNNN NNMMM MMMMM MMMMM MMMM LQ e v Q Q 0 W 28g48- m N Q W n mNWMO22222 Wm7,24 22274 2Wrm 2NW2ro 34382 4.1828 'N O M N 2 8 W N n W 2 8 1 NOoi O N 2482 VSM 0 .c4O M N MW W O=Wm NMMVn O0N NON WMONV ONmMO VNmE< V O WnWN VrOMM NWW N MQeQ QNNN WWWW WW,,, ,,WWW22 N NNN N N NNN N N NNN N 22,77,,% MMM M M MMM M M M M M 0 jF m 44232 NNWNr 42282 3'274 mNMmM W Q.-O«n O2WWM O M M W W 22224 NNW«O 23223 OONNN 2823 NMN O j M O i G C N I�O D u� f G V 6 i V t 0 N V N n« Y I�W W M O I� M c N M{p Q W 2 N O W W 7,M W n W 2 O«7,N N N N N«« O m W n W Q Q M M N N 7,0 2 W EE W O N 2 �M N N 7, O m N M 2 m W W W W W ro oED E m m 0 0 0 0 m m O o 0 E E E EEE E E 2 m W W EEEEE E E E E E O WW WW WEWWW EEEEE 22222 mm2 EEEEE EEEEW W v..-. .W W W N O rN^N N 1 07,2 NNNMn MmNNmWMONO 7,QNrOmWr4 8E2 4 2 2 27,2n NQro 27,7,WW mWnQ Om m 2 0d7, WSi0NN E e W W O e W M N e G o G N O 7, O Oi OWWWM 227g2 23222 208 2 e 22 2 2 8 WW2 228 2 NE22282 0 WErfE0 rE 22222 WNMN O 33222 3 0O>0 2 28822 rnWN nN Q Qri M mW WWmW WWWEEEEEEEEEEEEEEEEWEEE EEEEE comm.). d^i 7, 22212 272Q2 2QQW2 22434 M m M^N 22223 ONn7, M2NNr 22244 2MMMM 21.242 eM4N Q7,WWN 7.227.2 2842 f nm 0 0 0 22222 0222 rrMW2 22222 WWEEE 22222 a2222 22222 NWm2 m N N r Oi-N W O N Q r E gg ONNN NNNNN NNNNN 2W N N7,ee V N 8222') M2WM rQONM 38281 72WnQ 0NNVH 23282 7,NW2 m7,2Wr m 2 E e 2g2'22 7, MNnW0 32124 mQNW 4WM7,e 2 e 2 M NN 83222 22224 44422 222222 28E1E 71122 272280 82222 22228 82222 082228 2222 4 44 i x22 22848 243.34 2OrN V 22212 32342 mWeM 22g3 2 282E2 712232 NEENN A7222 2g22224120 E N 4222'i 2 7,2 4 2247-82 O N 7,N N Wm NNg287.2 Q N r 7,N 2`822 7,N M O7, N p WW E7, mmmm7, erOMN MN7,, WWE°, Mmmm. mmmmm mmmmm mmOm2Om 00000 00000 20000 co (V 0 8 E E U 0 410 S 0 m^0 mN N ee'm rOm N `N MO MrMNeoaC0 COjmOmma ms q"21,24 2T l6 = m mm.-.-T V e M M M N N NN a A AA AAAA AAAAA AA 2 r 00000 OOa J01 O0 00000 r Or a 0 0 ✓` 2 2 20mN AN m2N remN2 '4.. ;-r2 � v0e W r J � Wp0ae NmOoON LO O) m 2227, OOM 2e" a. 00 O . 22,';22 Nama 22 0 NJ NNNN NNNNN NN h aZitttt «<a< as ev N M 2 a2 mNOm :1'022g roan mA Mmarvm N O N? N'' VMom2O7,' a WN m mm e7,v4 as r rrrrr rrrrr nrrrr rr C m O N 2E224' l':::W r A m O`a aM aO nn `40 MCM'JM Omi Nh <ON 2 2 222m2 22222 22222 22 '3E7 m Nmro 0e 22220 co m. 00 0 O cc O e ram m M c M.-0 O ON OO c...0 T Q Q Q Q Q J 0 0 0 0 0 0 0 0 0 0 NOm mj m M¢QQQQ r N Wm m Oe O a M e m v O NI- e,corn 7,m 000,5r Mvr ao t99999 N e o m m r m O 20222 I • • • • • • • • • i i • i • • • • m CI Z e r 0 0 f m O m m Or W. ,x 0 0.0 g�ao NorN pm a moo p F. 2'60 222 W nnn raj o Ow¢ww0 0 m«N m e m m W No0 e ON m WA- F' >-1-TTI--11 •-�O NmNmahOOa m0 ›, 060000 9 mom NM�N� <m as 50-333 p u M MMeee vvv« WM Are g U-g�� Q m t O O p u N 4 ❑ Q`,4 •Naim mmmme 7,4 oa7, ;."..?0,28888 onoo Y 222 mom m W a M�mAm NN ��airra 'a � •� am a O v f'-2;r-4-'42, m W e ee ee eee can n-0 mm L nma° 'y` to S. At - iei•n a0 3 c m aO D C c O .2 _ m • z Sart 2[,';'4 ro annioT 222 . 2,... ago Nm w ....00NNN A >N0 0 O O j a0 mON mNoar`o 2'2'432 mnaae r`'ni N`r aCmma0 a0 61 rA £ m L M M M M M M a vvv a a a a« a s o y C j N Q7 m ❑ o,c d A L,30 O > O m • p« '82,`4) :: N a 0 N 0 ';2 2 `.2,7 'E'2""" c C £ �815y, m N v v mm c c c c c oi Nra0Omm tOON0 M N6OOmi moo IL (aJ mfO:I Uj W ttt0 N O a W 00 W WWWWW WWWmm WarWWW mm a <<<<<< p m n acis2r _ _ W io7- 3 •• tZ0 g sw W vcicv ccirvmiom am oa2o2Nmo to ¢ m O cNe o; ac 'a ccr rneivim aiN N roe 0 'Y N 04,--,-,-0 0 0 i7,m a r eo;46.6405 r m C% WWWWW mWWmm WWWWW N ~ "N2/42 m t v 0 2 t Eaa W ft `m;m o 2N am,7 Mro2212m �5 ro o.7o ' ,� hK N t 22 0mO 0 n-[ j. N NNNNN NNNN NNNNN NN 0OW0 OZ N NOO Oi mi N FSO W ,Z0- ❑ 0..- ❑ . u W N J m N _ LL W % ❑mNU r'7, a u-x ▪ e mm � mmmmmo.-rr, VNN F 0 om o N .wr - A-1-,-,-N NNNN NNNNN N 0w N OT. N O.. n J co O "C N £ 2L° m U to` 0 c 0,4: m A T Oa E 52 0 Nw • I Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Friday, April 03, 2015 3:50 PM To: AK, OPS FS2 OSM; AK, OPS FS2 DS Ops Lead; AK, OPS FS2 Facility OTL; AK, OPS FS2 Field OTL; AK, OPS PCC EOC TL; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; Cismoski, Doug A; AK, RES GPB East Wells Opt Engr;AK, OPS EOC Specialists; Daniel, Ryan; AK, RES GPB West Wells Opt Engr; G GPB FS2 Drillsites; Drotar, Mark; Wallace, Chris D (DOA) Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Well Integrity Coordinator; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Regg, James B (DOA) Subject: OPERABLE: Producer 09-03A (PTD #2141780) MIT-IA Passed Post Sidetrack Attachments: image001.png All, Producer 09-03A (PTD#2141780) underwent a rig sidetrack completed on 03/22/2015. The tubing was replaced and a MIT-T and MIT-IA passed on 03/21/2015. The passing tests confirms two competent barriers in the wellbore. The well is reclassified as Operable. • Well status is Operable • Annuli are fluid packed • A SSSV is not required Please use caution while placing the well on production due to fluid packed annuli. Thank you, Kevin Parks (Alternate: Laurie Climer) BP Alaska-Well Integrity Coordinator GVV Global Welis Organization Office: 907.659.5102 WIC Email:AKDCWelllntegrityCoordinator@bp.com From: AK, D&C Well Integrity Coordinator Sent: Monday, July 08, 2013 1:51 PM To: AK, OPS FS2 OSM; AK, OPS FS2 DS Ops Lead; AK, OPS FS2 Facility OTL; AK, OPS FS2 DS Operators; AK, OPS PCC EOC TL; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; Cismoski, Doug A; AK, RES GPB East Wells Opt Engr; Igbokwe, Chidiebere; AK, OPS EOC Specialists; Daniel, Ryan; AK, RES GPB West Wells Opt Engr; 'jim.regg@alaska.gov'; 'Schwartz, Guy L (DOA)' Cc: AK, D&C DHD Well Integrity Engineer; Holt, Ryan P; AK, D&C Well Integrity Coordinator Subject: NOT OPERABLE: Producer 09-03 (PTD #1760350) Failed Outer Annulus Repressurization Test All, s . • • Producer 09-03 (PTD#1760350) has an outer annulus buildup rate of 180 psi per day confirmed by an outer annulus repressurization test ending on 07/07/2013. The well has been considered to be manageable by bleeds, but recently the outer annulus was allowed to break MOASP. The well is reclassified as Not Operable until the pressure buildup can be managed. Plan forward: 1. DHD: Bleed inner annulus pressure below 1000 psi 2. Slickline: Dummy gas lift valves and MITIA to 2500 psi A copy of the TIO plot is included for reference. Please call with any questions. Thank you, Jack Disbrow (Alternate: Laurie Climerl BP Alaska-Well Integrity Coordinator Glogbal Wells '' Organization Office: 907.659.5102 WIC Email:AKDCWellIntegrityCoordinator@bp.com From: AK, D&C Well Integrity Coordinator Sent: Wednesday, July 03, 2013 7:47 PM To: 'jim.regg@alaska.gov'; 'Schwartz, Guy L (DOA)' Cc: AK, D&C Well Integrity Coordinator Subject: Producer 09-03 (PTD #1760350) Sustained Outer Annulus Casing Pressure Above MOASP All, Producer 09-03 (PTD#1760350) was reported to have sustained outer annulus casing pressure above MOASP on 07/01/2013. The well has known inner annulus by outer annulus communication that is manageable by bleeds. Recently, the outer annulus build up rate was reported to have increased to approximately 300 psi per day. The well is reclassified as Under Evaluation and placed on a 28 day clock to facilitate evaluation. Plan forward: 1. DHD: Perform outer annulus repressurization test to quantify outer annulus build up rate A copy of the TIO plot is included for reference. Please call with any questions. Thank you, Jack Disbrow (Alternate Laurie Climer) BP Alaska-Well Integrity Coordinator GVVGlobal Wells Organization Office: 907.659.5102 WIC Email:AKDCWeIIIntegrityCoordinator@bp.com 2 • • PT 21 -/ Loepp, Victoria T (DOA) From: Loepp, Victoria T (DOA) Sent: Thursday, January 22, 2015 3:18 PM To: 'Tempel, Joshua' Cc: Lastufka,Joseph N; Endacott, Mary S Subject: RE: Permit No. 214-178 (09-03A): Change_No Intermediate LOT Follow Up Flag: Follow up Flag Status: Flagged Josh, Approval is granted to delete the LOT at the 9-5/8" intermediate kick off point. Please include this approval with the approved PTD. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave,Ste 100 Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loeno alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victorialoem@alaska.gov From: Tempel, Joshua [mailto:Joshua.Tempel@bp.com] Sent: Friday, January 16, 2015 2:17 PM To: Loepp, Victoria T(DOA) Cc: Lastufka, Joseph N; Endacott, Mary S Subject: Permit No. 214-178 (09-03A): Change_No Intermediate LOT Hello Victoria, It was good to talk to you on the phone. I am the BP Drilling engineer working on the sidetrack 09-03A.The permit for well 09-03A was approved on 16 December 2014. I am writing to request a change to our permit so that we can abstain from performing a Leak Off Test(LOT)at the 9-5/8" intermediate kick off point(KOP). In the permit on line 21 of the operational summary we state that a leak off test will be performed after the 9-5/8" window is milled; however, after reviewing both the State regulation and BP's procedures, it appears that I do not need to perform an LOT unless we drill out of a shoe. 20 MC 25.030(f) 1. 0 • Instead of performing a LOT at the window I plan to drill the intermediate section using the original surface casing shoe Formation Integrity Test(FIT)of 12.5ppg. My engineering justification for not performing a new LOT is as follows: 1) Using the surface casing shoe FIT in a sidetrack correlates to the grassroots standard/regulation of drilling a well and using the surface shoe FIT/LOT.This is further correlated because there is no cement behind casing from the KOP to the surface casing shoe which would likely result in testing the integrity of over 4000' of formation. Performing a LOT at the KOP would be similar to performing a LOT part way through drilling the intermediate section of a grassroots well which is not the goal of a LOT. 2) The original surface casing FIT for 09-03 of 12.5ppg is greater than what is needed to drill the intermediate section of this well. Thank you for your consideration. Sincerely, Josh Tempel GWO I BP Alaska I Drilling Engineer— IPA Rotary I Mobile: +1 (907)891 5930 I Office : +1 (907)564 4578 I Office 7556 2 ti OF ew, //%i,_TFJ�s� THE STATE• • Alaska Oil and Gas mw 9A LASKA Conservation Commission owl 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 ALAS Fax: 907.276.7542 www.aogcc.alaska.gov Mary Endacott Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 09-03A BP Exploration(Alaska), Inc. Permit No: 214-178 Surface Location: 287' FSL, 722' FEL, SEC. 02, T1ON, R15E, UM Bottomhole Location: 3128' FNL, 4184' FEL, SEC. 11, T1ON, R15E, UM Dear Ms. Endacott: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, David J. Mayberry Commissioner DATED this (lo"day of December, 2014. RECEIVED STATE OF ALASKA ALA OIL AND GAS CONSERVATION COMFON OCT 2 9 20 'A. PERMIT TO DRILL 20 AAC 25.005 1 a.Type of work: 1 b.Proposed Well Class: ®Development Oil 0 Service-Winj ®Single Zone • 1 c.Specify if well is proposed or: 0 Drill ❑Lateral ❑Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 Coalbed Gas 0 Gas Hydrates ®Redrill 0 Reentry 0 Exploratory 0 Service-WAG 0 Service-Disp 0 Geothermal 0 Shale Gas 2.Operator Name: 5.Bond • ®Blanket 0 Single Well 11.Well Name and Number: BP Exploration(Alaska) Inc. Bond No 6194193 • PBU 09-03A 3. Address 6.Proposed Depth: 12.Field/Pool(s) P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 13030' • TVD 8677' Prudhoe Bay/Prudhoe Bay„ 4a.Location of Well(Governmental Section): 7.Property Designation(Lease Number): Surface: ADL 028327 • 287' FSL,722'FEL, Sec.02,T1ON, R15E, UM • 8.Land Use Permit: 13.Approximate Spud Date: Top of Productive Horizon: 685'FNL, 1814' FEL, Sec. 11,T1ON, R15E, UM February 10,2015 • Total Depth 9.Acres in Property: 14.Distance to Nearest Property: 3128'FNL,4184'FEL, Sec. 11,T1ON, R15E, UM 2560 16380' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 67.45' feet 15.Distance to Nearest Well Open Surface: x 717691 • y-5941735 - Zone- ASP4 GL Elevation above MSL: 20.5' feet to Same Pool: 69' 16.Deviated Wells: Kickoff Depth: 5200' feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 100 degrees Downhole: 3266 Surface: 2497 18. Casing Program Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 8-1/2" 7" 26# L-80 VT HC 3791' 5200' 5191' 8991' 8662' 220 sx Class'G' 6-1/8" 4-1/2" 12.6# 13Cr85 Hyd521 4330' 8700' 8410' 13030' 8677' 458 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth TVD(ft): Junk(measured) , 9500' 9180' 9169' 9381' 9070' 9071' Casing Length Size Cement Volume MD TVD Conductor/Structural 80' 20" 300 sx Arctic Set 32'- 112' 32'- 112' Surface 2676' 13-3/8" 5700 sx Arctic Set 30'-2706' 30'-2706' Intermediate Production 9444' 9-5/8" 1000 sx Class'G', 100 sx Arctic Set 29'-9473' 29'-9155' Liner Scab Liner 2355' 7-5/8" 250 sx Class'G' 7026'-9381' 6863'-9070' Perforation Depth MD(ft): 8974'-9171' Perforation Depth TVD(ft): 8690'-8874' 20.Attachments: 0 Property Plat ®BOP Sketch ®Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis 0 Diverter Sketch 0 Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date 22. I hereby certify that the foregoing is true and correct: Contact Joshua Tempel,564-4578 Printed Name y Mary Enndacott Title Engineering Team Leader { Email Joshua.Tempel@bp.com Signature 71 �" I i 1 Phone 564-4388 Date /(7/A)/4 Commission Use Only Permit To Drill API Number: --e>/--C/9 /`,• Permit Approval Date: See cover letter for Number: Z��/7 50-029-20209�A�Q ,�°!j `'i' W./V-42..QVcCc. other requirements: Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas [E contained shales: ` Other: QO1 f 5 f-p rt55v rc h'' 3 5 C 0 p 5 i , Samples Req'd: 0/Yes 'No Mud Log Req'd: 0,Yes L No 4 fr-t.--)v l a r -71-057"--pre-55 t".1-t- �5a o p5 i H2S Measures: i Yes 0/610 Directional Survey Req'd: [El Yes ❑ Jo Spacing exception req'd: 0 Yes le No inclination-only svy Req'd: 0 YesNo ' APPROVED BY APPROVED BY � � ��� COMMISSIONER THE COMMISSION Date iA/1Lr I I q Form 10-401 Revised 10/2 2 This Ir loN rrsn s from the date of approval(20 AAC 25.00 ( )) Submit Form and Attachments In Duplicate J ven /z//01I+ � ! t JIi//�i �� C/-/z • ! To: Alaska Oil & Gas Conservation Commission From: Josh Tempel, ODE Date: October 29, 2014 Re: 09-03A Permit to Drill Well Name: 09-03A Well Type: Producer Current Status: Shut-In MIT— IA Failed to 3500 (07/30/14) MIT—IA Passed to 2500 psi (07/30/14) MIT—OA Passed to 2000 psi (07/30/14) PPPOT-T—Pass (08/02/14) PPPOT-IC— Pass (08/02/14) Well History: 09-03 was completed in 1976. 09-03 has an allocated cumulative production of over 31 MMBO to date; however, the well has 0% ontime in the past 365 days due to consistently high watercut. The well also has an apparent slow IAxOA communication which is manageable with bleeds. The best utility for this wellbore is to sidetrack to a new location and simultaneously attempt to fix the IAxOA communication. Reason for RST: The current well is of little value as it is producing little oil and significant water(last well test: 13 bopd, 13,881 bwpd). Sidetracking this well will allow development of an oil lens that was not swept when the targeted zone was water flooded. This sidetrack will improve overall oil recovery from the field. 09-03A 1 27 October 2014 • S Planned Well Summary Well 09-03A • Well Producer TarrecObjt iIvishak 09-03A API Number: 50-029-20209-01 • Current Status Shut-In Estimated Start Date: February 10th, 2015 Time to Complete: 40 Days Surface Northing Easting Offsets TRS Location 5941734.95 . 717690.84 • 287' FSL/722' FEL - 10N 15E sec 2 Tie in Northing Easting TVDss Offsets TRS (Sidetrack 5941619.05 717701.70 -5123 5109' FNL/715' FEL 10N 15E sec 2 point) Northing Easting TVDss Offsets TRS Ivishak 5940732.00 716628.00 -8590 685' FNL/ 1814' FEL 10N 15E sec 11 BHL 5938222.44 714331.71 -8609 3128' FNL/4184' FEL 10N 15E sec 11 Planned KOP: 5200' MD/-5123' TVDss Planned TD: 13030' MD/-8609' TVDss Rig: Doyon 14 BF-RT: 46.95' RTE (ref MSL): 67.45' - Directional — Schlumberger P5b KOP: 5200' MD Maximum Hole Angle: —30° in the 8-1/2" intermediate section —100° in the 6-1/8" production section Close Approach Wells: 03-33A Survey Program: 113'-5113'—CB-Gyro-MS 5113'-5200'—CB-Gyro-MS 5200'-5525'—INC+TREND 5525'-13130' - MWD + IFR + MS-WOCA Nearest Property Line: 16380' Nearest Well within Pool: 69' 09-03A 2 27 October 2014 ,. , • • Formation Tops & Pore Pressure Estimate (SOR) Estimated Most Likely Depth Fluid Formation Formation Top Pore Pressure Uncertainty Type (TVDss) (EMW ppg) (+/-TVD ft) (for sands) SV4 -3,139 8.40 20.00 SV3 -3,696 8.40 20.00 SV2 -3,885 8.40 20.00 SV1 -4,307 8.40 20.00 UG4 -4,935 9.30 20.00 Water UG4A -4,975 9.30 20.00 Water UG3 -5,135 9.30 40.00 Water UG1 -5,870 9.30 40.00 Water WS2 -6,424 9.00 20.00 WS1 -6,627 9.00 20.00 CM3 -6,904 9.30 20.00 CM2 -7,375 9.80 40.00 CM1 -8,026 10.00 20.00 THRZ -8,383 10.00 30.00 oil/water LCU/TSAD/Z4B -8,603 7.30 20.00 oil/water 42N -8,670 7.30 20.00 oil/water 42P -8,700 7.30 20.00 oil/water TCGL -8,738 7.30 20.00 oil/water BCGL -8,780 7.30 20.00 oil/water 24N -8,858 7.30 30.00 oil/water 24P -8,881 7.30 30.00 oil/water 22N -8,922 7.30 30.00 oil/water 22N -8,931 7.30 30.00 oil/water 24P -8,901 7.30 30.00 oil/water 24N -8,883 7.30 30.00 oil/water BCGL -8,816 7.30 30.00 oil/water TCGL -8,779 7.30 30.00 oil/water 42P -8,748 7.30 30.00 oil/water 42N -8,729 7.30 30.00 oil/water TSAD -8,625 7.30 30.00 oil/water Casing/Tubing Program Hole Liner/ Wt/Ft Grade Conn Length Top Bottom Size Tbg O.D. MD/TVDss MD/TVDss 8-1/2" 7" LNR 26# L-80 VT HC 3791' 5200'/5123' 8991'/8594' 6-1/8" 4 '/"TBG 12.6# 13CR-85 VamTop 8700' Surface 8700'/8342' 6-1/8" 4 '/" LNR 12.6# 13CR-85 Hyd 521 4330' 8700'/8342' 13030'/8609' 09-03A 3 27 October 2014 • • Mud Program Intermediate Mud Properties: LSND 8-1/2" hole section Depth Interval Density(ppg) PV YP API FL HTHP FL MBT PH Window Milling 9.5 • 8-18 26-30 <8 NA <18 9-10 KOP—7600' 9.5-10.0 10-15 18-25 <8 NA <20 9-10 7600'—8200' 10.0-10.4 • 10-15 18-25 <8 <10 <20 9-10 8200'—TD 10.2-10.4 , 10-15 18-25 <8 <10 <20 9-10 Production Mud Properties: Water Based Polymer Fluid 6-1/8" hole section Density PV YP Low Shear Depth Interval API FL Rate MBT pH (ppg) (cp) (Ib/100ft2) Viscosity 8603' -TD 8.5-8.8 <8 12- 18 <12 15000-30000 <4 8.5-9.5 Logging Program 8-1/2" Intermediate: Drilling: GR, Res • Open Hole: None Cased Hole: None Sampling: Per wellsite geo 6-1/8" Production: Drilling: Res, Neu, Dens, Gamma at Bit, Sonic • Open Hole: None Cased Hole: None Sampling: Per wellsite geo Cement Program Casing Size 7" 26#, L-80 Intermediate Liner Lead: N/A Basis: Lead TOC: N/A Tail: Open hole volume+ 30% excess + 80 ft shoe track Tail TOC: 1,500' MD above liner shoe Total Cement Lead N/A Volume: Tail 45.9 bbls, 257.4 cuft, 220 sks of 15.8 ppg Class G, Yield: 1.16 ft3/sk 09-03A 4 27 October 2014 ! • Casing Size 4.5" 12.6#, 13Cr-80 Production Liner Basis: Tail: Open hole volume + 30% excess Tail TOC: TOL Total Cement Tail 94.72 bbls, 531.80 cuft, 458.45 sks of 15.8 ppg Class G, Yield: 1.16 ft3/sk Volume: Surface and Anti-Collision Issues Surface Shut-in Wells: No wells are in the shadow of the rig and need to be shut in. - Close Approach Shut-in Wells: 03-33A fails major risk. A TCR will be completed for 03-33A. The 03-33A wellbore has already been P&A'd, • and therefore no further action is required. Hydrogen Sulfide DS 09 is considered an H2S site. Recent H2S data from the site, and near the site, is as follows: Well Name H2S Level Reading Date Comments Parent Well(if sidetrack) 09-03 650 ppm 6/25/2013 #1 Closest SHL Well H2S Level 09-04A 550 ppm 1/11/2014 #2 Closest SHL Well H2S Level 09-02 130 ppm 1/7/2013 #1 Closest BHL Well H2S Level 03-03 225 ppm 1/12/2014 #2 Closest BHL Well H2S Level 03-31 160 ppm 2/1/2014 #3 Closest BHL Well H2S Level 09-27 140 ppm 2/9/2013 #4 Closest BHL Well H2S Level 09-01 200 ppm 2/4/2014 Max.Recorded H2S on 09-29 1200 ppm 7/31/2008 Pad/Facility Faults Formation Where Encounter Fault MD Intersect TVDss Intersect Est.Throw Throw Direction Uncertainty v No anticipated faults DRILLING WASTE DISPOSAL • There is no annular injection in this well. • • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II waste to DS-04 for injection. Haul Class I waste to DS-04 and/or Pad 3 for disposal / Contact the GPB Environmental Advisors (659-5893) for guidance. 09-03A 5 27 October 2014 S WELL CONTROL Well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and an annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3500 psi. BOP regular test frequency will be 14 days during drilling phase and 7 days during sundry operations. Intermediate Interval Maximum anticipated BHP 3226 psi in TSAD at-8603' TVDss (7.30 ppg EMW) Maximum surface pressure 2405psi (based upon pressure at TD - 0.10 psi/ft gas gradient to surface) Planned BOP test pressure Rams test to 3,500 psi/250 psi. Annular test to 3,500 psi/250 psi Production Interval Maximum anticipated BHP 3266 psi in TSAD at 8931' TVDss(7.30 ppg EMW) 7 Maximum surface pressure 2497 psi (based upon pressure at TD-0.10 psi/ft gas gradient to surface) - Kick tolerance Infinite with a 8.8 ppg mud and assuming a max PP of 7.3 ppg and a minimum Frac Gradient of 9.1 ppg in the Ivishak. Planned BOP test pressure Rams test to 3,500 psi/250 psi. Annular test to 3,500 psi/250 psi Integrity Test-6-1/8" hole FIT after drilling 20'of new hole Planned completion fluids 8.5 ppg Seawater/6.8 ppg Diesel Proposed Pre-rig prep work: (11/8/14) 1. Fullbore P&A. Planned TOC at 8664' MD. 2. D&T TOC. MIT-T 2500 psi. Pull GLV at Sta 7 3 Circulate Cement Plug into TBG & IA -42 bbls of 15.8 Class G. TOC -7500' (length-1000' MD) 4. CMIT-IAxT to 3500psi. 5. MTT log from-5400'to-5000'. TBG Cut-5200'. Planned KOP is-5200'. 7. MIT-OA to 1200psi. CMIT-IAxT to 3500psi. 8. Bleed T/I/O to 0 psi 9. Install Dry Hole Tree. Install Annulus Valves. Set TWC. Planned Rig Work: (2/10/15) 1. MIRU Rig D14 2. Test TWC from above to 3500psi for 5 minutes, and from below to 3000 for 5 minutes. 3. Nipple down tree. Nipple up BOPE (Configured from top to bottom: annular preventor, 7" fixed rams, blind/shear, mud cross, 2-7/8"x 5-1/2"VBR). Test BOPE to 250 psi low/3500 psi high. 4. Pull TWC, circulate out freeze protection, and displace well to clean seawater. 5. RU and pull the 7"26#tubing and the 5-1/2" 17#tubing from the pre-rig cut made at-5300' MD. 6. PU 4" drill pipe and 8-1/2" clean-out assembly and RIH to clean-out 9-5/8" casing to the top of the tubing stub at-5300' MD. 7. RIH with 9-5/8" cutting tool to-2350' MD and cut the 9-5/8" casing. POOH 8. Combo pressure test the IA and OA to 2000psi for 30 minutes and chart. 09-03A 6 27 October 2014 • ! 9. Circulate fluid through the cut to clean ArcticPak from the OA. 10. Change out to 9-5/8" rams and test rams to 250 psi low/3500 psi high. 11. MU casing spear assembly and unseat the 9-5/8". Pull the 9-5/8" casing from the cut at-2350' MD. 12. RIH with casing scraper and clean-out the 13-3/8"casing and dress off the 9-5/8"casing stub. 13. MU and RIH with 9-5/8"tie back assembly to just above the 9-5/8" casing stub. 14. Pump cement job. 15. Land the 9-5/8"tieback assembly. 16. Pressure test the IA to 3500psi for 30 minutes and chart. 17. Change out to 2-7/8"x 5-1/2"VBR Rams. Test to 250 psi low/3500 psi high. 18. PU and RIH with 9-5/8" whipstock assembly, spacer tubulars, 8.5" window milling assembly, and MWD tool for orienting. RIH and tag the tubing stub. Orient and set the whipstock. Shear off the whipstock. 19. Displace the well to 9.50ppg milling fluid prior to the 9-5/8" casing milling operations and other path forward 8-1/2" drilling operations. 20. Mill a window in the 9-5/8" casing at-5200' MD plus drill 20' of new formation from mid-window. 21. PU into 9-5/8" casing and perform a LOT. --- 22. POOH for drilling BHA. 23. MU the 8.5" intermediate hole drilling BHA and RIH. �- fes'' r ,,o " 4 24. Drill 8.5" intermediate hole to TD at TSAD. 25. Circulate hole clean. POOH for 7" liner. 26. RIH with 7" liner to TSAD. Attain a minimum of 150' of liner lap. 27. Pump cement job.15.8ppg class G cement, to 1500' MD above the shoe and a minimum of 650' TVD above DPZ 3. 28. Set liner hanger and liner top packer. 29. After the cement reaches 500 psi compressive strength, pressure test the 7" liner to 3500psi for 30 minutes and record the test. 30. POOH 31. Change out 7" BOP rams to 2-7/8" x 5-1/2"VBR and test to 250 psi/3500 psi. 32. PU 6-1/8" Drilling BHA (RSS) including MWD/GR/Res/ Neut/Den/Sonicscope and RIH to the landing collar. 33. Displace the well to 8.5ppg drilling fluid and drill out the 7"shoe track plus 20' of new formation. 34. Pull into the shoe and perform an FIT. 35. Drill the 6-1/8" production hole as per the directional plan and rig site geologist. Drill TD with a 120' rat hole past TSAD for logging and cementing. 36. MU and RIH to bottom with 4.5" production liner. 37. Rotate the liner, and pump the liner cement job. Cement will be brought over TOL. 38. Set liner hanger 39. Set liner top packer at 8690' MD 40. Release from liner. 41. Circulate out excess cement. 42. POOH, LD drillpipe and the liner running tool 43. Once cement reaches 500psi compressive strength then pressure test the liner top packer to 3500psi. 44. PU and RIH with 2-7/8" perforation guns. Guns are 6 shots per foot, 60 degree phasing, and random orientation. Perforate the production zone. 45. PU and RIH with a 4-1/2"tubing completion. Sting into the 4-1/2" liner tie back sleeve. 46. Make up tubing hanger per FMC rep. Land the tubing hanger and run in the lock down screws. 47. Drop ball and rod. Pressure test the tubing and IA to 250 psi low/3500 psi high for 5 minutes low/30 minutes high. 48. Hold pressure on the IA and bleed tubing pressure to zero thereby shearing the DCK shear valve. Pump both ways to confirm circulation ability. 49. With landing joint still rigged up, reverse circulate diesel freeze protect using rig injection pump. 09-03A 7 27 October 2014 4111 S 50. Allow the diesel to U-tube, drain the stack, and rig down the landing joint. Monitor the well for 1 hour to confirm the well is dead. 51. Install a TWC with a dry rod. Test from below at 250 psi low/3500 psi high. Test from above at 250 psi low/3500 psi high. 52. Nipple down BOPE. Nipple up the adaptor flange and master valves and test to 250 psi low/5000 psi high for 5 minutes low/5 minutes high. Test with diesel. a. Ensure Heet is left on the TWC and only diesel (no water) is left in the tree. 53. Install all annulus valves and secure the well. Ensure T/IA/OA all have two barriers in place. 54. Secure the well. RDMO Post-Rig Work: 1. Pull TWC 2. Install generic GLV design 3. Install memory BHP gauge(-1 month) 4. Pull memory gauge 5. Install deep GLD 6. SIT planned 7. Anticipated cement evaluation 8. Flowback through portable test separator(if required) 9. Add perf contingent plug set within —2 months of POP 10. PPROF and/or acidize contingent upon performance within 6 months of POP 09-03A 8 27 October 2014 • 0 09-03A DRILLING CRITICAL ISSUES POST THIS NOTICE IN THE DOGHOUSE I. Well Control / Reservoir Pressures/ Lost Circulation / Breathing © Expect Ugnu overpressure to 9.3ppg Kick Off p Maintain 9.5ppg minimum mud weight Point © Low chance of lost circulation © Minimum mud weight of 9.5 ppg through the Ugnu. © Weight up to 10.0 ppg by 7600'MD,and 10.2 ppg by 8200'MD. Intermediate Hole IA Maintain a mud weight of 10.2 ppg—10.4 pgg through the HRZ. © No mapped faults,low chance of lost circulation. © Expect underpressure to 7.30ppg © Maintain 8.5 ppg minimum mud weight Production Hole El No mapped faults,low chance of lost circulation. © Utilize good hole cleaning practices to avoid high ECD and prevent pack-off potential which could induce losses/ breathing. II. Integrity Testing Test Point Test Depth Test type EMW(lb/gal) 7"shoe 20'-50'from the 7"shoe FIT 9.1 ppg minimum(infinite) Ill. Faults rFormation Where Encounter Fault MD Intersect TVDss Intersect Est.Throw Throw Direction Uncertainty No anticipated faults 09-03A 9 27 October 2014 S IV. H2S Well Name H2S Level Reading Date Comments Parent Well(if sidetrack) 09-03 650 ppm 6/25/2013 #1 Closest SHL Well H2S Level 09-04A 550 ppm 1/11/2014 #2 Closest SHL Well H2S Level 09-02 130 ppm 1/7/2013 #1 Closest BHL Well H2S Level 03-03 225 ppm 1/12/2014 #2 Closest BHL Well H2S Level 03-31 160 ppm 2/1/2014 #3 Closest BHL Well H2S Level 09-27 140 ppm 2/9/2013 #4 Closest BHL Well H2S Level 09-01 200 ppm 2/4/2014 Max.Recorded H2S on Pad/Facility 09-29 1200 ppm 7/31/2008 Other Relevant H2S Data (H2S alarms from rigs,etc.) V. Anti-Collision Issues Close Approach Shut-in Wells: 03-33A fails major risk. A TCR will be completed for 03-33A. The 03-33A wellbore has already been P&A'd and therefore no further action is required. CONSULT THE DS-09 PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. 09-03A 10 27 October 2014 S 0 1 I 41.1_ Von, FAD= FKCI 0 9-03 SAFETY NOTE1."•CINQUE MCI'''''' ACTIA.TOR= A XELSON NDAL KB Bi 51 f 2204" !-.r FS'4J sssv nr.,D-5.985 I ((OP„, 4464. _,, CONDUCTOR. , i .....-2 , May A/gin= 75'g 564(r _- • , ' 2419' __1 Hm-tol ...% Datum li)= 9150 _1995 .I Ceioni TVD- 8800 SS -,/ i- 2884' --1 7'X.1,,1(2'YO,11=4847 j 11 wc.::,,z, 2,[----,, 80.3, - ,:3,, --i=fc;6. _r _ 111/24 It I MANDRILS H 11-1.(1.,:,150,13CIIR...:..({, 1)(1. Op' I.r o,,.(I,' 2884' I----- Sr MD TV D GEV i TY PE VI V LA rcri R)R1l BA If- 1 1477 3477 0 LB MY T-2 0 '09/12/13 5 1/2-TBG,UM,13CR NSCC, -1 593C 2 5245 5232 18 LB [MY T-2 0 09V12113 02375p1 I)..419T M-1 3 6059 59/8 75 US CAM T-2 0 03/29/97 riot7 4 691/ 6767 23 18 MY 12 0 04.39(01 -Eaita Wir 5 7419 7227 21 1/31/0 P.m BK 0 01'2991 I 9-5fr X 7-5/6'sc.*,6 Lta I 7021' : 6 79)3 7765 zo mac CI& BK 0 0:1120,97 V '`...'..., mu 7 8523 8264 19 KBMG OMY BK 0 03/29/97 ,, 9 V 1901 ) {A.UV X IC V7 80,II, 1 4•41 Minimum/0--3.813"@ 87116' s•s• VI ti 4-1/2"HES X NIPPLE so"o 14 09 %.... __ '•.• 11171i 11111=MI 7 518'X 4 V2'OAR S.3 ROL E.,3.835'1 •s,,i e', 0 r WU' -14-1/7 Ht5 X NIP 0=3 813" I e e e• So"o 'o,0• i-itr MG,1260,13CR FOX,i- 5807' :Z.'', ?V 9807' -14•112.ALE"--t•3-958.1 J.. L3157474.V-3 II414N,;,‘"kl("I'IINI) I I 9048;---i64-871-----.5$ 9053. -Ran,?Air x 4-1/2"BKR FBI 1i1r•oRIA1-1(I wat97) H 905T-9060'j—xs.% . N imil 1 071 271:MD ii_waili DI,F4'31:1,4::.111:or_is!ixt,7940v,4,613.47:e.ii; 1 e,c, 4-172'MG,12158,11C IL 4151 bpi/11 'I 1118_111' -.111_1........17110 ,''illo LAX _A V 1 ....1 V .143801M111161511.11MARY r 6 9057' -A 4-1/2••MJLESHOE,D=3.1)56. j e r. 181-1 CKi 61-05 08104/11/76 " A i m 1 9070' 7 In mulootalmfaver 1, ANGLE AT TOP FIRE:20*4])8914' ' 14;4,e %for to Roducaon DB for hkaorical pelf data %Oaf SIZE SPF I 141ERVAL CprOSNz SI-VT I SCIZ Iracutpc%DIE FRAN SHDE 3-308' 4 '8974 9030 0 12i14/90 IILOST 08/2619Y) 3-3/Er 4 9076-9069 0 05,118!9 3 e9. 3-343' 4 '9/..1f 7-9061 5 05103.," 12431190 • I 3.343r 2 9105 9134 0 03105!91 53, ' 4 9105 9136 0 04(18.92 g 19105 9145 5 05821,130 12131790 '4.4 9134-9145 5 05121/90 12101190 '1" 3-3111r 2 ,9141-9171 0 11/09/91 3-33' 4 9150-91/0 S 10/0387 214 3 3113' 4 91% 9246 5 05113177 12181190 4'4 9169'EL11611-18,-'(5E1 0901/005,1-Bic mcii-Ev:>-(u2.7.-/,9, 13' 4 9272 9284 5 osio3rr7 12101/90 .til 4 P WEN MAIL 80L CTU MAY I AVE BURNED 3 31 33/8' 4 9292 9297 5 05/03(77 12101/90 4' g OYFfi 8-•1704 B01.71(0971319f) 3-341- 4 9305-9310 S 05703177 1201/90 i, 1 N tii / I Fern() 93ra ' i I 7 .,11-S'CAY1144R,29 74 L SO, 045960,ID-6 875' H 93,31. ie.iago:in ,10 , K .Xi* • 9-518"csG /i ,4 ,SOUG5 J& r L,13 8 68'• --L.... 9473' ' [/4Th 14 v 1 l'/'I X AAA N IS DATE REV BY COMMiNTS j 1 KUCK*BAY 1.147 0.418(76 RAN 34 1MTIAL COMPLETION 09103714 IOC RITORIAN T-F43-Fix; WELL. 09-03 12,04490 P MVO 09108/14 Al PJC lafT IA AND 7-5/8_MR P4(X3/ F*34.1T No.1760350 0312297- 018 MVO MI No: 50-029-20209-00 J484/10 IN/IV EtYPIC.DFIRTCTIDIC t SEC 2,MN R15E,248 FSL&723'FE. I 99i13/13 ZAN 1.JC 5551/ra.colirthc FUN •- ----. 99(13/.13 CJM PJC.GLV CIO(09/12.113) _ OP Exple r a oo n(Alas ka) 09-03A 11 27 October 2014 • . II III TREE- C1W AD. PRE RIG 09-03 1 SAFETY NOTES:"'CFROME TBG'" V11.1:1C- F141C I ACTUATOR= AXELSON P&A KRAL KR ELE 54 __--- __4 2204' 1-17"I-8 RPF1 9SSV M'II=S 903' .1 LW.ELLV- ") -cxvwcrort I ? I -- - KOP- 4939' • , W--7A ..,...--. 2411' --145/5-1-0I Mix Angle- 75'I§5640 D,, . V Ai— -I 2665' -19 sir ro i Ritmo II.10= 915(1 -roc(A(Go 3(10) I 248W-241W / Oat Lan IVO= 8800'SS --1 new I irx6 to•mio-4 992- I 13-343'CSG.72N.k4N-80 FWD,D'12 lir H 2704W FIRAT4341-5 ST MI IVO DEV Fr'i F.;MG,24-$.13CR NSOC,a38360,D-6276' 2/1 1 3477 3477 0 . ..' 2 5745 5732 18 ..II ' LAT' 1-c U Minimum ID ;•-•3.958" @ 6936' 3 6059 5978 25 LB OW T-7 ! 0 korner 5-1/2"X 4-1/2"X0 .... Mil 4 6917 6(9223 LB CM( 1-2 0 94/3001 ---. 5 7419 7227 71 KB1/G 110 Ba 0 ,032997 16-12-TBG OJT(X00C/14) - 6 7993 77E5 20 KOS/G WV ' BK 0 032997 -51112'IBC,17t,13CR NSCC, H OWN 0272 8411,111=4.892' I TOP Of CEMEN1 11 t /$is 7 8523 8264 19 KBMG '010( EiK 0 -03126897 * ,9-1-:a..'t-is'::--eir=Biriihiiveiale418)0Cqx)014) '0,' ----- .,.:'0. WNW 1-11-172;X 4 1r? 0:6;iiiii1 69 56' ii i I .;i ..,.. ..... la arr x T519 SCAB seas r4H 7026' —1 • , .., ?i nur _194ix.x,-,lm_Lir&„pit Ei„eni5.] ETOP OF(78MEN1 RIO 8 APICLAS(X00(14) "---- -4500 I," .i?"1! 4, . ,K I 1 19164' ) 17 5/6"X 4,ia•BKR 8 3 RR, r'' 41sel,41 K '.,• "40 A f 1 1 8768' 1-14-10-1-65 x No.0=3.11F1. ,•,..4,4, .4 4.,0,,,4„;" y. 4-1.7 19G,12,6*,12CR FOX, &tor „ ,,,X , , -I Boor I-+-iv%AA ra,n=3 968'1 ii.....,. 0 "se i...,r _ -012b4.12=3.968' •i)0410/AN .kr..,0-ne,orvriers: 111.19940 PUNCH(003147)..I 1104W-1110411' ...CC e;'45e,;411454':6 f. 1053' —(ELmol t-tws•oc4-4/2-SKR FBI / ——''--—----'-- "1 r----—--- '10 1e. "Nr"%rre-tr' 11U91163 RICH(11123/97) 1-1 WIT-NW I 4-1/2-113G.12.06,11c J-1 mar1 V e 6:.‘144111,41.1 1 , '.# illiLA11314 IV' m.,U ..,1113' ...__-_ • . ..,...•••••".• • 1416-0144110NSUIANRY ‘..'./.A 7;1'11;4,:"ii ir REP LOG BHCS°Novi tris 1 %`.''`e ‘2.,A•k• % k I.••• 1g v.,c.... 9057" —4-1/2^IAJLESHOE,D=3 9513' I ANGIF AT TOPPI:RE 70'0 8974' 'le i(4111140"11 I- 9070' I--I_HP•11)/(XX11011(736), '4, I.P.?", : P4xLc.Refer to Rod VC ill2n CO la nistoricar pertilato pl! ....... ' '10 ...rar. 1 9071ELMD I--;RSI i-ram T OF MASI-Cali Fit SIZE SPF 1013NAL OpruSor S(-12T1. 502 _....,„.. — 3-SF 4 5974-9030 S 12)1490 )0004114 3-3/0 4 9076-9089 S 05/18/53 )000514 3-Ir 4 90??-9087 S 05003077 1201/93 3-308- 7 9105-9134 5 03/05191 X.XIX2914 3-3/8' 4 9105-9136 5 04/1692 XX1XX/14 9105_9145 S 0582 V91 1b01/90 *, g '9134 9145 5 0521090 12/01/90 3-3173- 7 i 9141-9111 8 11/11M91 XX/XXJ14 3-3,9' 4 9150-91/0 5 10103/117 12001.90 3 319- 4 9196 9246 5 050377 12431/99, 9169'ELM I—DP f5E1 39111195)-AIGASHEDC1-1(02/22(911 3-3X 4 9772-9784 S 05003/77! 1301/90 ?* 43/77 12 1 ,01/90 : il 1 Mien WELL 001 CTU MAY HAVE BI.NMED 3-3Ar 4 9292-929? S 06 OVER T•IT OF BOO!(09113191) 3-3r9' 4 9305-9310 5 0503/f/j 1201.% RITE) 9363' .11 Er we-SCAB r kit 211/4,t eo,0459 bpi.0-*6 line i--I 9381' I- ir,' ,..0•yip, ,. ,, ir 404 /0 • 11..-, !4'PA.eett,VOiti 1 0-5.s.csc.479,50005 Mt,13-8.681' 9479' • 611`• . _ OATE REV BY COMitlf 5 04,18176 FM 34 111T1AL COMPLETION 1218 IMES MVO 03/28197 016 to 3 DAM 1 t0ee BY 09/1114 JUNG PROPOSED P&A 185-03) 10/2414 J1/PJC FEV 3 PROtasEDP6A 10/25/14 .117PJC REV 4 PROFOSAL GMT UF114,1E T _ COMENTS ----- PRLCHOE BAY UNIT WE._ 09-03 FIERMT It:'1/60350 AN N) 50-029-20209-00 SEC 2,TON,R15E,246 FSL&723'FE_ ElP Exploration gAllaaka) 09-03A 12 27 October 2014 • .... S III WEILICAD,, mai 09-03ASAFETY NOTES:WELL ANGLE.70 0 """"MAX ACTUATOR= PROPOSAL 0103 a pi= 54' _r f 1 I BP 11.EV- .1 -(X44188;1,044, H ,It ,,,,...P#Ux AN.41t;,-n '4, ' . 1i A --;? 1-{CIEMENT'TOP IA [Alum MD. Pi 11 24191 -1 s sra•ra DANA%TVE1- WOO'SS • 1 / "9-5-41;TT 1i 1A0.t t,t,*es I 1433%mu ToP 434 3 say 4. / GAS Lk I MNPCIRELS 197MT ESG SIM i X81XX/141 1-4Z/Aid 4/ ST MD TVD CEV TYPE VLV LATCH PORT LATE 13 31 4.44-30 BUTT,93-1234r 1- 2706" 7 -3455-3450 6 -4902,-4950 487-5/r'317-14VftLrPtlAk'-o-= 1--1-41iiir 1. 5 -5845-5600 lir 4 -86634-6550 r0:5-i-Ti-W(48 44-1-1, =-.--9-4--—-1-- 1 -7265-710:11 WIIPST004{ / 4 )j--r-ZII424Xl / -7545-7450 __. .._,,,,,,..........„.., _ 1 44-8/8-(-SG,.4744 80095 AL,rt.8884'7-1 .8200 4 -KM-79W 1 Minimum 10 MI " OUT WINDOW f90 93A1 1 IIIIP 01.41844811 H -7491 a a N 1-14 rxi-4-.1.2.X N*-1 IE=3 843- ,8 a 1 -6360 HT X 4 1e2"PCS TNT PKR,ID-1 P175" 1 I . L 1-44 yr tiEs X NP Al 1-{4,br ip"A xi." oil.] II •4 % IMP OF 4-1/2-4h1P4.1 .,- - I-I r sr 8-44844,w848r104 ci v, 8 . 4 ter TB,G,1280,1$64-8----"8-81-8746-P:. q 0162 bpf,WO mr .k. el ---- --p, 1,2'4,44.1C,, 4.1 .051 TT NOT,..OGGED I 1 7.LNEL Ma,L-60 VAM TOP, -6091 -, * i 03.13 bpr,ID*6276' g4 r 6 -1+-1..2"X 4-112"X0,13.3 960;1 PERFORAMIN SUMMARY ? 6-1/8" REF LOG. LOG ON XXIXX/XX ft. .1" f :I66a ]-f I12 RA kip Jcial Kai Rater to Production($3 for halorical pee data SIZE SPE etTERVAL CoolSig SRN SQZ -1 1 200 j-ei_i a-Fok PUP Jaw 1 I L P511) H -12941 4-Tri.1-tft,12",19°9'--- - --i -1 3°31 oi s7 hpf,10.3 05/r DATE REV BY' CONSENTS DATE REV BY CONSENTS FRLETHOE BAY GPM 04110/76 1010134iitanAL COM PLERON 09118114 JT/RIG REV 2 PROPOSA,.. VAIL 09 03A 121041130 N2E:3 tREVO 1024/14 Jr/RIG REV 3 PROP ....NR UPEAIL.5 PERMIT No 03120197 DIA RIVO API No 50 029 20249 01 XX1f.111 PADEPRA- CK(09-03A) t SEC 7,T1ON,R1 5P,248PSI a 773'FA , 17133$141 J7/RC,BUI11)PROPOSAL 09/0614 117 PJC LREV I PROPOSAL Be aploration(Alaskal 09-03A 13 27 October 2014 • Doyon 14 BOP Stack __________ 13 5/8�. 5000 PSI, WOK- ANNULAR BOP, STJDDED TDP/FLANGED BOTTOM STUDDED 10P 13 5/8". 5000 PSI, '0' MPL OPERATORS. HYDRIL PPE RAM 3r 3'CHOKE UNE ..' I T 13 5/8 5000 PSI. '0"MP;. OPERATORS, H ` _ �—� HYDRIC BEING RAM STUDDED BOTTOM BX 160 46, L__ ! 3 1/8'5000 PSI 'CR VALVE 3'CHOKE UNE no. 41k i1 9 ---_ �' 3 1/8` 502"KILL 00 PSI GATE VALYL 4'5-3/4' 3 1/8" 5000 PSI HCR VALVE / 3 1/8"5000 PSI GATE VALVE JJ SINGLE '3 5/8". 5000 PSI, 10"MPL OPEAR'ORS, r-- HYDRIC PIPE RAM ---------------------=..._. FLANGE BOTTOM/ILANGED TOP 9X 160 ADAPTER SPOOL Bial' SLACK � — FLANGE/FLANGE LHEAD -AFF-•:+G-11 •uI I ' II ' 09-03A 14 27 October 2014 • • RECEIVED Tempel, Joshua kine n 2D11 From: Davies, Stephen F (DOA) <steve.davies@alaska.gov> AOC:ICC Sent: Thursday, October 30, 2014 5:58 PM V-+'V To: Lastufka, Joseph N; Tempel, Joshua Subject: PBU 09-03A (PTD #214-178): Directional Survey/Anti-Collision Data Needed Categories: CAUTION: External email —increased risk of phishing Joe,Joshua: All directional survey and anti-collision data were missing from the application submitted to AOGCC for PBU 09-03A. Could BP please provide printed copies of the planned directional survey, the directional survey plat(map)views, the directional survey vertical section diagram, and the anti-collision report? Thanks, Steve Davies Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission (AOGCC) Phone: 907-793-1224 AOGCC: 907-279-1433 Fax: 907-276-7542 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it,and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov. Original Message From: Lastufka,Joseph N [mailto:Joseph.Lastufka@bp.com] Sent: Wednesday, October 29, 2014 1:27 PM To: Davies, Stephen F (DOA); Bettis, Patricia K(DOA) Subject: Emailing: 09-03A MD INC AZ.xlsx Steve, This Permit to Drill will be delivered this afternoon. Please let me know if you have any questions. Thanks! Joe 1 • IP le Schlumberger0{`' 09-O3A(P5)Proposal Geodetic Report (Def Plan) Report Date: August 13,2014-0205 PM Survey/DLS Computation: Minimum Curvature/Lubinski Client: BP Vertical Section Azimuth: 225.456°(True North) Field: Prudhoe Bay Unit-EOA ,,�� Vertical Section Origin: 0.000 fL 0.000 ft Structure/Slot: 00-09/09-03 (', g l 1 TVD Reference Datum: Rotary Table Well: 09-03 ®®®® �°,r�j[J I,, ND Reference Elevation: 67450 ft above MSL Borehole: Plan 09-03A Ife4 w Ground Elevation: 20.500 tt above MSL API#: 500292020901 Magnetic Declination: 19 872° Survey Name: 09-036(P5) Total Gravity Field Strength: 1001.9972mgn(9 80665 Based) Survey Date: August 13,2014 Gravity Model: DOX Tort/AHD 1 001/ERD Ratio: 224 157°/5532.831 ft 16 25410.614 Total Magnetic Field Strength: 57597.766 nT Coordinate Reference System: NAD27 Alaska State Plane,Zone 04,US Feet Magnetic Dip Angle: 81.013° Location Lat I Long: N 70°14'36.42873",W 148°14'29 69084" Declination Date: December 31,2014 Location Grid N/E 710: N 5941734 950 ftUS,E 717690 840 ftUS Magnetic Declination Model: BGGM 2014 CRS Grid Convergence Angle: 1 6550° North Reference: True North God Scale Factor: 0 99995383 God Convergence Used: 0.0000° Version/Patch: 27 1043.0 Total Corr Mag North->True North: 19.6716° Local Coord Referenced To: Well Head Comments MD Incl Asim True TVDSS ND VSEC NS EW TF DLS Directional Northing Eaeting (et) (°) (*) (n) (n) (n) (ft) (rt) (1 (°/1OOft) Difficulty Index (8155) (SUS) 0.00 0.00 0.00 -67 45 0.00 0.00 0.00 0.00 OM N/A 0.00 5941734 95 717690.84 48 95 000 000 -2050 46 95 0.00 0.00 0.00 270M 0.00 0.00 5941734 95 717690.84 113.45 0.00 270.00 48.00 113.45 0.00 0.00 0.00 270M 0.00 000 5941734.95 717690.84 213.45 0.33 270 00 146.00 213.45 0.21 000 -0.29 325M 0.33 0.00 5941734.94 717690.55 313 45 0.25 325.00 24600 313.45 0.37 0.18 -0.70 194M 0.28 0.00 5941735.11 717690.13 413.45 0.50 194.00 346 00 413.45 0.71 -0.07 -0 93 140M 0.69 0.19 5941734 86 717689.91 513 45 0.50 140.00 445.99 513 44 1.12 -0.82 -0.76 142M 0.45 0.55 5941734 10 717690.11 613.45 0.42 142.00 545.99 613.44 1.19 -1 45 -0.25 230M 0.08 0 71 5941733.50 717890.63 713.45 0.17 230.00 64599 713.44 138 -183 -0.14 271M 0.45 0.87 5941733.12 717690.75 813 45 0.17 271.00 745.99 813 44 1 63 -1.92 -0.40 149M 012 0.93 5941733.02 717690.50 913.45 0.42 149.00 845.99 913.44 1.82 -2.24 -0.36 160M 0.53 1.08 5941732.71 717690.54 1013.45 0.33 180.00 945.99 1013.44 2.11 -2.84 -0.17 141M 0.22 1 16 5941732.11 717690 75 1113.45 0.33 141 00 1045 98 1113.43 234 3.35 0.01 154M 0.22 1 24 5941731 60 717690.95 1213.45 0.17 154.00 1145.98 1213.43 2.42 -3,71 0.26 81M 0.17 1.29 594173125 71769120 1313.45 0.58 8100 1245.98 1313.43 2.05 -3.76 0.82 118M 0.55 1.40 5941731.22 71769177 1413.45 0.50 118.00 134598 1413.43 1.51 -3.89 1.71 168M 0.35 150 5941731.12 717692.86 1513.45 0.17 188.00 1445.98 1513.43 1 48 -4 24 2.12 205M 0 41 1.57 5941730 78 717693.08 1613.45 0.50 205.00 1545.97 1813.42 1.95 -4.78 1.97 150M 0.38 1 63 5941730 23 717692 95 1713.45 0.58 150 00 1645 97 1713.42 2.48 -5.61 2.04 214M 0.50 1.71 5941729.40 717693.04 1813.45 0.25 214 00 1745.97 1813.42 2 82 -6.23 2.17 180M 0.52 1.78 5941728 79 717693.19 1913.45 0.50 180.00 1845 97 1813.42 3.34 -685 2.05 258M 032 1.83 5941728.17 717693.08 2013 45 0.25 258.00 1945 96 2013.41 3.83 -7.33 1.83 228M 0.51 1 89 5941727 68 717692.88 211345 0.17 228.00 2045.96 2113.41 417 -7.47 1.51 211M 0.13 191 5941727.52 717692.56 2213.45 0.67 211 00 2145.98 2213.41 4 88 8.07 1.10 58M 0 51 1 97 5941726.91 717692.17 2313.45 0.92 58 00 2245 96 2313.41 4.66 -8.15 1.48 75M 1 55 2.07 5941728.85 717692.55 2413.45 1 17 75.00 2345 94 2413.39 2.99 -7.46 3.14 183M 0.40 2.15 5941727.58 717694.20 2513.45 0.50 183.00 2445.93 2513.38 242 -7.83 4.11 170M 1.41 2.24 594172744 717695.17 2813 45 0.25 170.00 2545 93 2613.38 2.87 -8 28 4 12 158M 026 227 5941728.79 717695.20 2713.45 0.83 158.00 2645.93 2713.38 327 -9.17 4.43 155M 0.59 2.32 5941725.91 717695.53 2813.45 0.75 155.00 2745 92 2813.37 3 77 -10.43 4.98 160M 0.09 2.35 5941724.67 717696 12 2913.45 0.83- 160.00 2845.91 291336 4 29 -11.71 5.50 162M 0.11 2 39 5941723 41 717696.68 3013.45 0.75 162.00 2945 90 3013.35 4.88 -13.01 5.95 168M 0.08 2.42 594172212 717697.17 3113.45 0.67 168.00 3045.89 3113.34 5 49 -14.20 6.28 177M 0.11 2.45 5941720.93 717697.53 3213.45 0.58 177.00 3145.88 321333 6.14 -1528 6 43 90M 0.13 2 47 5941719.86 717697.70 3313.45 0.33 90.00 3245 88 3313.33 6.27 -15.79 6.74 340M 0.65 2.51 5941719.37 717698.03 3413 45 0 25 340 00 3345.88 3413.33 5 97 -15.58 8.95 334M 0.48 253 5941719.58 717698.24 3513.45 0.25 334.00 3445.88 3513.33 5 81 -15.18 8.78 325M 0.03 2.54 5941719.97 717898 06 3613.45 0.50 325.00 3545 88 3613.33 567 -14.63 8.44 329M 0.26 2.56 5941720.52 717697 70 3713 45 0.25 328.00 3645.88 3713.33 5.55 -14.08 6.08 170M 0.25 2 57 5941721.05 717697.32 3813.45 0 17 170.00 3745 88 3813.33 5.58 -14.04 5,99 220M 0.41 2.59 5941721 09 717697.23 3913.45 0.25 220.00 3845.87 3913 32 588 -14.35 5.87 222M 0.19 2 60 5941720 77 717687.13 4013.45 0.25 222.00 3945 87 4013.32 6.32 -14 68 5.59 269M 0.01 2.61 5941720.43 717696.85 4113.45 0.25 269.00 4045.87 4113.32 6.69 -14.85 522 230M 0.20 2.62 5941720.26 717696.49 421145 0.33 230.00 4145.87 4213.32 7.14 -15.04 4 79 251M 021 2.63 5941720.06 717696 06 4313.45 0.25 251.00 4245.87 4313.32 762 -15.30 4.38 267M 0.13 2.65 5941719 79 717695.64 4413.45 0.25 26700 4345.87 4413.32 7.98 -15.38 3.93 163M 0.07 2.65 5941719.69 717895.22 4513 45 1 25 183.00 4445.86 4513.31 8.65 -18.43 4.04 167M 1.33 271 5941718.64 717695 35 4613.45 2.50 167 00 4545.81 4613.26 10.30 -19.60 4.84 172M 1.26 2.78 5941715.50 717696 25 4713.45 5.00 172.00 4645.58 4713 03 14.03 -26 04 5.94 174.5M 2.52 2.92 5941709.09 717697.53 4813.45 7.00 174.50 4745 03 4812.48 2047 -36 42 7 13 178.5M 202 3.06 5941698 75 717699.02 4913.45 9.67 178 50 4843.97 4911 42 30.04 -50.89 794 5.438 2.73 3.22 5941684 32 717700.24 5013.45 11.83 179.50 494221 5009 66 42.90 -69 54 8.25 7 47R 2.17 3.38 5941665.68 717701 09 UG3 5047.02 12.81 180.08 497500 5042.45 4791 -76.70 8.27 6.9R 2.94 341 5941658.53 717701.32 Tie-in Survey 5113.45 14.75 181 00 5039.52 5106.97 59.12 -92.52 8.11 6.6R 2.94 3 51 5941642.71 717701 62 Top Whipstock 5200.00 1698 181.88 5122.77 519022 76.14 -118.17 7.51 45R 2.59 3.63 5941619.05 717701.70 Base Whipstock 5216.00 18.45 186.36 5138.01 5205.46 79.80 -121 02 7.15 HS 12.50 3.67 5941614.19 717701.48 Cry 3.5/100 5238.00 18.45 188.36 5158.98 5224.43 84.71 -127.31 645 10761R 0.00 3 69 5941607 88 717700.96 5300.00 17.90 193 32 5217 79 5285.24 100.90 -148.95 306 100.99R 3.50 3.78 5941588.16 717698.14 5400.00 1756 204.78 5313.08 5380 53 128.03 -175.60 -680 90.07R 3.50 3.89 5941559.23 717689 11 5500 00 17.89 216 24 5408.36 5475.81 157.30 -201 69 -22.21 79.156 3 50 3.99 5941532.71 717674.47 5600.00 1885 22694 5503.29 5570 74 188.82 -225.12 -43.10 69R 3.50 4 08 5941508 69 717654.27 5700.00 20 36 236 36 5597 51 5664.96 221.87 -245.79 89.39 60.11R 3.50 4.17 5941487.27 717628 58 5800.00 2230 244 38 5690.68 5758.13 256 91 -263.63 -10099 52.64R 3.50 4.25 5941468.52 717597 51 End Cry 5855 32 23.53 248 24 5741.64 5809 09 277 02 -272.27 -12072 HS 3.50 4.29 5941459.32 717578.04 5900.00 23.53 248.24 5782.60 5850.05 293.46 -278.88 -137.28 HS 0.00 4 31 5941452 24 717561 88 1./01 5995.32 2353 248.24 5870.00 593745 328.54 -292.98 -172.81 HS 0.00 436 594143712 717526.77 6000.00 23 53 248.24 5874.29 5941 74 330.26 -293.67 -174.35 HS 0.00 4 38 5941436 38 717525 05 6100 00 23.53 248.24 5965.98 8033.43 367 06 -308.47 -211.42 HS 0.00 4.40 5941420.52 717488.43 6200.00 23.53 248.24 8057 67 8125.12 403.86 -323.27 -248.49 HS 0.00 4.44 5941404.66 717451.80 6300.00 23.53 248.24 6149.36 6218.81 440 66 -338.07 -285.56 HS 0.00 4 47 5941388.79 717415.17 6400 00 23.53 248.24 6241.04 8308.49 477 46 -352.86 -322.63 HS 0.00 4 51 5941372.93 717378.55 6500.00 23.53 248.24 8332.73 6400 18 514.26 -367 68 -359 71 HS 0.00 4 54 5941357.07 717341 92 WS2 659954 2353 24624 6424.00 6491 45 550.90 -382.39 -39661 HS 0.00 4 56 5941341.28 717305.46 6600 00 23.53 248.24 8424.42 6491 87 551 06 382.46 -396.78 HS 0.00 456 5941341 21 717305 29 6700.00 23.53 248.24 6516.11 8583.56 587.87 -397.25 -433.85 HS 0.00 4.59 5941325.35 717268.87 6800 00 23.53 248 24 8607.80 6675.25 624.87 -412.05 -470 92 HS 0.00 4 62 5941309 49 717232.04 WS 1 6820.94 2353 248.24 662700 6694 45 632.37 -41015 -478.68 HS 0.00 4 62 5941308.17 717224.37 6900.00 23.53 248 24 6699 49 6766.94 681.47 -426.85 -507 99 HS 0.00 4 64 5941293.63 717195.41 7000 00 23.53 248 24 6791 17 8858 62 698.27 -441 65 -545.06 HS 0.00 4 66 5941277 77 717158 79 7100.00 23.53 248 24 6882 86 6950.31 735.07 -456 44 -582 13 HS 0.00 4.68 5941261 91 717122.16 CM3 712305 23.53 248.24 6904.00 6971 45 743.55 -459.85 -59068 HS 0.00 4.69 5941256 25 717113 72 7200.00 23.53 248 24 6974 55 7042.00 771.87 -471.24 -619.20 HS 0.00 4.71 5941246.05 717085 53 7300 00 23.53 248.24 7066.24 7133.69 808.67 -486.04 -656.28 HS 0.00 4 72 5941230 19 717048.91 7400 00 23.53 248.24 7157 93 7225.38 845.47 -500.83 -693.35 HS 0.00 4 74 5941214 33 717012.28 7500 00 23 53 248.24 7249 62 7317 07 88227 -515.63 -730.42 HS 0 00 4 76 5941198.48 716975.65 7800.00 23.53 248.24 7341 30 7408.75 919.07 -530.43 -787 49 HS 0.00 4.78 5941182 60 716939 03 CM2 7638.75 23.53 248.24 7375.00 744245 932.60 -535.87 -781.11 HS 0.00 4 78 5941176 77 718925 57 7700 00 23.53 248.24 743299 7500.44 955.87 -545.23 -804.56 HS 0.00 4 80 5941168.74 716902 40 Drilling Office 2.7.1043.0 Prudhoe Bay Unit-EOA\DS-09\09-03\Plan 09-03A\09-03A(P4) 11/3/2014 9:33 AM Page 1 of 2 • S Comments MD Incl Azim True TVDSS TVD VSEC NS EW TF DLS Directional Northing Easting (R) (°) (°) (ft) (ft) (R) (ft) (R) (°) (°1100rt) Difficulty Index (ftUS) (SUS) ' 7800.00 23.53 248.24 752468 7592.13 992.87 -560.02 -841.63 HS 0.00 481 5941150.88 716865.77 7900.00 23.53 248.24 7818.37 7683.82 1029.47 -574.82 -878.70 HS 0.00 4.83 5941135.02 716829.15 Cry 3.5/100 7940.80 23.53 248.24 7853.78 7721.23 1044.49 -580.86 -893.83 104.05L 0.00 4.83 5941128.55 716814.20 8000.00 23.11 243.11 7708.15 7775.60 1066.45 -590.49 -915.18 99.34L 3.50 4.86 5941118.30 716793.15 8100.00 22.79 234.16 7800.27 7867.72 1104.30 -610.71 -948.37 91.09L 3.50 4.90 5941097.14 716760.55 8200.00 22.97 225.17 7892.43 795988 1142.97 -635.81 -977.92 82.8L 3.50 4.93 5941071.19 716731.74 8300.00 23.65 216.48 7984.29 8051.74 1182.31 -665.71 -1003.70 74.82L 3.50 4.97 5941040.56 718706.84 CM/ 8345.62 24.12 212.71 8026.00 8093.45 1200.44 -680.91 -1014.17 71.37L 3.50 4.99 594102507 716696.80 8400.00 24.79 208.41 8075.51 8142.96 1222.18 -700.29 -1025.60 67.46L 3.50 5.01 5941005.37 716685.94 8500.00 28.32 201.10 8165.75 8233.20 1262.43 -739.42 -1043.56 60.881_ 3.50 5.04 5940985.74 716669.12 8600.00 28.18 194.61 8254.67 8322.12 1302.90 -782.96 -1057.50 55.091_ 3.50 5.07 5940921.82 716656.44 End Cry 8686.41 30.00 189.65 8330.19 8397.64 1337.95 -824.01 -1068.27 HS 3.50 5.10 594088053 716648.88 8700.00 30.00 189.65 8341.96 8409.41 1343.46 -830.70 -1067.41 HS 0.00 5.11 5940873.81 716647.92 THRZ 874739 30.00 189.55 8383.00 845045 1362.67 -854.06 -1071.38 HS 0.00 5.11 5840850.34 716844.62 8800.00 30.00 189.65 8428.56 8496.01 1384.01 -880.00 -1075.79 HS 0.00 5.12 5940824.30 716640.96 8900.00 30.00 189.65 8515.16 858261 1424.56 -929.29 -108417 HS 0.00 5.13 5940774.78 718634.01 Tot 1 Z4 8986.41 30.00 189.85 8590.00 8657.45 1459.60 -971.88 -1091.42 HS 0.00 5.15 5940732.00 71662800 7"Cso 8991.41 30.00 189.65 8594.33 8861.78 1461.63 -974.35 -1091.83 HS 0.00 5.15 5940729.52 716627.65 9000.00 3000 189.65 8601.77 8669.22 1465.11 -978.58 -1092.55 HS 0.00 5.15 5940725.27 716627.06 LCIUTSAO Z4B 9001.42 30.00 189.65 6603.00 8870.45 1485.69 -979.28 -1092.67 HS 0.00 5.15 5940724.57 716626.96 Cry 10.5/100 900641 30.00 189.65 8607.32 8674.77 1467.71 -981.74 -1093.09 HS 0.00 5.15 5940722.10 716626.61 42N 9082.05 37.94 189.65 8670.00 873745 1501.96 -1023.38 -1100.17 HS 10.50 5.20 5940880.28 716620.74 9100.00 39.83 189.65 8683.97 8751.42 1511.10 -1034.48 -1102.06 HS 10.50 5.21 5940669.12 716619.17 42P 9121.22 42.06 189.65 8700.00 8767.45 1522.37 -1048.19 -1104.39 HS 10.50 5.23 5940855.35 71661723 End Cry 9163.12 48.45 189.85 8730.00 8797.45 1546.08 -1077.01 -1109.29 HS 10.50 5.25 5940626.41 718813.17 TCGL 9174.73 46.45 189.65 8738.00 8805.45 1552.90 -1085.30 -1110.70 HS 0.00 5.26 594061807 716612.00 8200.00 48.45 189.65 8755.41 8822.86 1567.76 -1103.36 -1113.77 HS 0.00 5.26 5940599.94 716609.45 BCGL 9235.89 46,45 189.65 8780.00 8847.45 198874 -112887 -1118.11 HS 0.00 5.27 5940574.32 716605.85 Cry 10.5/100 9250.21 46.45 189.65 8790.00 885745 1597.27 -1139.24 -1119.87 HS 0.00 5.27 5940583.90 716604.39 9300.00 51.68 189.65 8822.81 8890.06 1827.77 -1178.31 -1126.18 HS 10.50 5.30 5940526.66 716599.16 25N 9315.42 53.30 189.65 8832.00 8899.45 1637.69 -818837 -112823 HS 10.50 5.31 5940514.55 718597.46 25P 9322.17 54.01 189.65 883600 8903.45 1642.10 -1193.73 -1129.14 HS 10.50 5.32 5940509.17 718596.70 9400.00 62.18 189.65 8877.10 894455 1895.64 -1258.81 -1140.20 HS 10.50 5.37 5940443.79 716587.52 9500.00 72.68 189.65 8915.42 8982.87 1770.42 -1349.72 -1155.68 HS 10.50 5.43 594035248 716574.70 22N 9523.77 75.18 189.65 8922.00 8989.45 1788.95 -1372.24 -1159.49 HS 10.50 5.44 5940329.87 718571.52 22P 8564.82 79.49 189.65 8931.00 899845 1821.42 -1411.71 -1186.20 HS 10.50 5.47 5940290.21 716565.95 9600.00 83.18 189.65 8936.30 9003.75 1849.82 -1445.99 -117203 HS 10.50 5.49 5940255.78 718561.11 9664.93 90.00 189.65 8940.16 9007.61 1902.16 -1509.85 -1182.89 12.55R 10.50 5.52 5940191.64 716552.10 End Cry 9681.13 91.66 190.02 8939.92 9007.37 1915.32 -1525.81 -1185.66 HS 10.50 5.53 5940175.61 716549.80 970000 91.66 190.02 8939.38 9006.83 1930.69 -154439 -1188.94 HS 0.00 5.54 5940156.95 716547.06 8800.00 91.86 19002 8936.48 9003.93 2012.13 -1642.82 -1206.33 HS 0.00 5.56 5940058.06 716532.52 9900.00 91.66 190.02 8933.58 9001.03 2093.57 -1741.25 -1223.72 HS 0.00 5.58 5939959.17 716517.98 10000.00 91.68 190.02 893069 8998.14 2175.02 -1839.69 -1241.11 HS 0.00 5.61 5939860.28 716503.43 Cry 8/100 10018.15 91.86 190.02 8930.16 8997.81 2189.80 -1857.55 -1244.27 20.82L 0.00 5.61 5939842.33 71650080 10100.00 96.25 18827 8924.52 8991.97 2255.58 -1938.15 -1257.24 20.941_ 6.00 5.84 5939761.40 716490.15 Tot 3 10149.11 9900 18720 8918.00 8985.45 2294.08 -1986.38 -1263.79 28.591_ 6.00 5.66 5939713.00 718485.00 End Cry 10163.12 99.74 188.79 8915.72 8983.17 2304.90 -2000.09 -1265.48 HS 6.00 5.86 593969924 718483.71 10200.00 99.74 186.79 8909.48 8978.93 2333.28 -2036.19 -1289.78 HS 0.00 5.67 5939663.04 718480.46 Cry 6/100 10248.45 99.74 188.79 8901.29 8968.74 2370.57 -2083.60 -1275.42 101.42R 000 5.68 593961548 718476:18 10300.00 99.11 189.86 8892.84 896029 2411.11 -2133.91 -1282.79 101.93R 6.00 5.70 5939564.98 716470.27 10400.00 97.83 195.79 8878.11 8945.56 2494.37 -2230.31 -130474 102.8R 6.00 5.74 5939468.00 716451.12 Tot 4/Cry 4/100 1049700 96.50 201.50 8866.00 8933.45 258023 -2321.46 -1335.50 88.11R 6.00 5.77 5939376.00 716423.00 10500.00 96.50 201.82 8865.66 8933.11 2582.95 -2324.23 -1336.60 88.136 4.00 5.77 5939373.20 716421.99 10600.00 96.82 205.65 8854.23 8921.68 2675.18 -2415.22 -1376.41 88.59R 4.00 5.80 5939281.10 71638482 10700.00 96.70 209.87 8842.63 8910.08 2769.71 -2503.18 -1422.51 89.05R 4.00 5.83 5939191.85 718341.28 10800.00 96.75 213.70 8830.91 8898.36 2866.15 -2587.87 -147466 89.53R 4.00 5.85 5939105.89 716291.59 10900.00 96.77 217.73 8819.14 8888.59 2964.00 -2668.29 -1532.62 906 4.00 5.88 5939023.64 716235.99 11000.00 96.75 221.75 8807.36 8874.81 3062.79 -2744.63 -1596.09 90.47R 4.00 5.91 5938945.50 716174.75 11100.00 96.70 225.78 8795.65 8863.10 316204 -2816.33 -1664.78 90959 4.00 5.93 5938871.85 716108.17 11200.00 96.02 229.81 8784.04 8851.49 3261.26 -2883.04 -1738.34 91.41R 4.00 5.96 5938803.05 716038.57 1130000 96.50 233.83 8772.61 8840.06 3358.97 -2944.43 -1816.41 91.876 4.00 5.98 593873943 715960.31 11400.00 96.36 237.88 8761.41 8828.86 345769 -3000.21 -1898.63 92.328 400 600 5938681.30 71587974 11500.00 96.18 241.88 8750.48 8817.93 3553.95 -3050.10 -1984.58 92.768 4.00 6.03 5938628.95 715795.27 11600.00 95.97 245.89 8739.90 8807.35 3648.27 -3093.87 -2073.85 93.19R 4.00 6.05 5938582.63 715707.31 11700.00 95.74 249.91 8729.89 8797.14 3740.19 -3131.28 -2186.00 93.66 4.00 6.07 5938542.57 715616.28 11800.00 95.47 253.92 8719.93 8787.38 3829.27 -3162.17 -2280.58 93.99R 400 6.09 5938508.96 715522.63 11800.00 95.18 257.92 8710.64 8778.09 3915.07 3186.39 -2357.14 94.3612 4.00 6.11 5938481.97 715426.82 End Cry 11909.99 95.15 258.32 8709.74 8777.19 3923.45 -3188.44 -2366.87 HS 4.00 6.12 5938479.64 715417.15 1200000 95.15 258.32 8701.87 8789.12 3998.75 3206.58 -2454.67 HS 0.00 6.13 5938458.97 715329.92 12100.00 95.15 258.32 8892.69 8780.14 4082.40 -3226.73 -2552.20 HS 0.00 6.14 5938436.01 715233.01 12200.00 95.15 258.32 8683.72 8751.17 4186.05 -3246.89 -2649.74 HS 0.00 6.15 5938413.05 715136.10 1230000 95.15 258.32 8674.74 8742.19 4249.71 -3267.04 -2747.28 HS 0.00 6.17 5938390.09 715039.19 12400.00 95.15 258.32 8665.77 8733.22 4333.36 -3287.20 -2844.81 HS 0.00 6.18 5938387.12 714942.28 12500.00 95.15 258.32 8656.80 8724.25 4417.01 3307.36 -2942.35 HS 0.00 6.19 5938344.16 714845.38 12600.00 95.15 258.32 8647.82 8715.27 4500.87 -3327.51 3039.88 HS 0.00 6.20 5938321.20 714748.47 12700.00 95.15 258.32 8638.85 8706.30 4584.32 -3347.67 3137.42 HS 0.00 6.22 5938298.23 714851.56 12800.00 95.15 258.32 8629.88 8697.33 4667.97 3367.82 -3234.95 HS 0.00 8.23 5938275.27 714554.65 12900.00 95.15 256.32 8620.90 8688.35 4751.63 3387.98 -333249 HS 0.00 6.24 5938252.31 714457.74 12910.05 95.15 258.32 8620.00 8687.45 4760.04 -3390.00 3342.30 HS 0.00 6.24 5938250.00 71444800 13000.00 95.15 258.32 8611.93 887938 4835.28 -3408.13 -3430.03 HS 0.00 6.25 5938229.35 71436083 TO 13030.05 95.15 258.32 660923 8676.68 4860.42 -3414.19 -3459.34 0.00 6.25 5938222.44 714331.71 Survey Type: Oct Plan Drilling Office 2.7.1043.0 Prudhoe Bay Unit-EOA\DS-09\09-03\Plan 09-03A\09-03A(P4) 11/3/2014 9:33 AM Page 2 of 2 • 0 a •2. 22.2 22222!.2222 aooaa :oa000 aa: E o n� Ma.. Milt8oaa8 %% ' s° ., ssmm ;3A4 Ii g 0 I 'e N o!;si gra^ 06 a t ao_ a 8 9 ga-aa 4614Vas 3 pa E 8 a" ' 5.M:. SfA6 811 E(�&o c5 § Y tEEl:2w : Ma 8 1$7,.:2;:41$7,.:2;:4 88 8 ill' 1 3 W sZ0AA RRlf 9�aa_ mF ct c 8 88 8 8.88.8.8. 8888 d a s2 i Niki - I§ § IIII§ g,1aA m i C .. '' A i �y a 6 ad N w..., e,d. ac k b ut z z 2 8 to & Ra858 88°'8 zg a1pt P s,. 6 SB ee§ & 0 0 £"g5 a€ y3 7 a A}> 88! 5 J takigVF ao $ s= ^6an' 1"AX'' ^aag s°mnag tEA:E =1”t 2Es iitt8 EESiEEE _i'tst Y Ig; 882113« 2 8888888 80.033888,A�AA gt;tp,� i8 mtEESEEEEE=EEEEEEE .888EEEEEEEEEE1 .n 0sk o Qo 6 : ttsi 3 :' o vs 2 EE n E 44228 s ' e 8&5a3ag '', as ' $ °8E ' 0ega1 CAF 21 EE4 ^ - (�pypj , a=wOo A 5 '' g ill no '' t Pa ; tt�3333 1 k ?2 2 2 2 8 e01;.igg zgZ 8-igilli 8 a ! 08 1 ° $ bEEEEiE !. 3 ai£5£5£ a o a! a E assss¢ ; G F U a a a a a s a sssess i aa'11 a E NEEEEEF 5 w ;1 1 &Ifi9 . a $ LLss $ssssss '' 1 8o% %�E ps i 9888888 , MN:l 6 66' , 41 �s$''b,g§a ' no o$s I e 888.88.8 : x s iE 1 ff "A• MA : gg Ut ',„ 0,,, v., hill 5 3 3 021Por 10 EiSV • • 4 rewpcem Cads 1 22&-bS bb 2222, bbbbb bbbb �r.22'2'rr tee .22..!'!22222'! ez ezz zeee szzzseezzzz- II os`o avaeoo as ae f,% 88 8 88866 83V, 66 51E1 — ea e a V,', d 1 8 six 2 SR:--ata $8'8 E a E lis 8 YY $ c,__ . YV*F 211 8w:e '5- 5g$aigwo ia_ ?.,'S 8 a7,—.2;:: 5828iiif g &I a ! 8mm naa& e 8 88 8 88888 8888 0. 52 s 5 s xte 8 !A ! X82 m s a o a mm a m8m� w� z 2 a -e x aaa ante :all"; s'et - ss . � �V E a "s I gr g,7, Q2! t 1 m v 2oo$$ oa$ $**2281 S 22 5 888882882 0 ', s ' 882c^mn55 5558888558888828522 1 2� 3 3o a 666i8t2:222A226 ;;“tt AEltgigg 1 s=iwiw e Z 5$ 212:252 22588888 -558882222881 t;Tg; 1 la ms's"s tat..-otosset msssssgg`sse2sg i sz A K ii G b ', i a sF 5 5 '' nr _ `eo 6 8 .r5 4 112 9 g 88 °o 84 a g '', 00 8 ' 4 88" u G E E �n Ep 84-8 1,1g.gg ' � gitt2?8- 851 2 8 pp pp g ppb 4' rc SA �S da 1 uu�z�H b'. O �as!srts m 8 c 1 -888888 wo4m 1 o 011111 8° ° LLsn. ie. 8888888 1288 80$ i o- M Itoisann 2 .2;i € 886 _ ii i B 8488888 ' i 3 IT 1 '''Fig!! m g; II! e dgdg 1 @=SwaCB C pal sd�a 51,1. s 4 • • North America - ALASKA - BP Prudhoe Bay PB DS 09 09-03 Plan 09-03A Plan#5b 09-03A Anticollision Report 15 September, 2014 le • BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 09-03 Project: Prudhoe Bay TVD Reference: 09-03A plan P237 @ 67.45usft(P273 plan) Reference Site: PB DS 09 MD Reference: 09-03A plan P237 @ 67.45usft(P273 plan) Site Error: 0.00usft North Reference: True Reference Well: 09-03 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore Plan 09-03A Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan#5b 09-03A Offset TVD Reference: Offset Datum Reference Plan#5b 09-03A Filter type: NO GLOBAL FILTER:Using user defined selection&filtering criteria Interpolation Method: MD Interval 50.00usft Error Model: ISCWSA Depth Range: 5,113.45 to 13,130.05usft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,470.85usft Error Surface: Elliptical Conic Survey Tool Program Date 9/9/2014 From To (usft) (usft) Survey(Wellbore) Tool Name Description 113.45 5,113.45 09-03 Srvy 1 CB-GYRO-MS(09-03) CB-GYRO-MS Camera based gyro multishot 5,113.45 5,200.00 Pian#Sb 09-03A(Plan 09-03A) CB-GYRO-M5 Camera based gyro multishot 5,200.00 5,525.00 Plan#5b 09-03A(Plan 09-03A) INC+TREND Inclinometer+known azi trend 5,525.00 7,025.00 Plan#5b 09-03A(Plan 09-03A) MWD MWD-Standard 5,525.00 8,980.00 Plan#5b 09-03A(Plan 09-03A) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 8,980.00 10,500.00 Plan#5b 09-03A(Plan 09-03A) MWD MWD-Standard . I 8,980.00 13,130.05 Plan#5b 09-03A(Plan 09-03A) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB DS 03 03-33-03-33-03-33 Out of range 03-33-03-33A-03-33A 10,370.37 12,450.00 73.48 657.34 -558.02 FAIL-Major Risk 03-33-03-33B-03-33B Out of range 03-33-03-33C-03-33C Out of range 9/15/2014 12.50:49PM Page 2 of 4 COMPASS 5000.1 Build 61 0 0 BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 09-03 Project: Prudhoe Bay TVD Reference: 09-03A plan P237 @ 67.45usft(P273 plan) Reference Site: PB DS 09 MD Reference: 09-03A plan P237 @ 67.45usft(P273 plan) Site Error: 0.00usft North Reference: True Reference Well: 09-03 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore Plan 09-03A Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan#5b 09-03A Offset TVD Reference: Offset Datum Offset Design PB DS 03- 03-33-03-33A-03-33A offset site Error: 0.00 usft Survey Program: 100-BOSS-GYRO,10406-MVVD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/.g +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (soft) (usft) (usft) (1 (usft) (usft) (usft) loss) (usft) (usft) 10,081.58 8,993.81 13,150.00 8,902.41 44.93 237.21 -88.46 -1,808.28 -1,935.86 5.812 695.74 602.56 97.60 Pass-Major Risk 10,107.36 8,991.14 13,100.00 8,898.36 45.07 237.20 -89.59 -1,843.58 -1900.69 5.812 656.26 598.49 61.62 Pass-Major Risk 10,133.74 8,987.74 13,050.00 8,896.81 45.22 237.18 -90.48 -1,879.16 -1,865.61 5.812 616.71 595.03 25.12 Pass-Major Risk 10,158.84 8,983.89 13,000.00 8,897.48 45.37 237.15 -91.22 -1,913.60 -1,829.38 5.812 576.09 591.30 -11.84 FAIL-Major Risk 10,186.25 8,979.26 12,950.00 8,899.09 45.53 237.13 -91.35 -1,947.36 -1,792.53 5.812 534.99 590.06 -51.82 FAIL-Major Risk 10,213.45 8,974.66 12,900.00 8,900.75 45.69 237.11 -91.26 -1,981.47 -1,756.02 5.812 494.17 590.18 -92.96 FAIL-Major Risk 10,244.71 8,969.37 12,850.00 8,902.87 45.86 237.09 -91.19 -2,014.66 -1,718.68 5.812 452.62 589.70 -134.20 FAIL-Major Risk 10,282.73 8,963.06 12,800.00 8,904.25 46.04 237.07 -88.75 -2,046.08 -1,679.82 5.812 409.55 609.92 -198.05 FAIL-Major Risk 10,317.44 8,957.57 12,750.00 8,904.50 46.20 237.04 -86.70 -2,075.24 -1,639.22 5.812 364.45 629.21 -262.90 FAIL-Major Risk 10,343.11 8,953.67 12,700.00 8,903.17 46.31 237.01 -85.82 -2,101.44 -1,596.66 5.812 317.75 643.13 -323.72 FAIL-Major Risk 10,359.51 8,951.25 12,650.00 8,902.21 46.39 236.98 -86.01 -2,123.67 -1,551.91 5.812 269.61 651.83 -380.27 FAIL-Major Risk 10,368.09 8,950.02 12,400.00 8,918.59 46.43 236.79 -132.09 -2,191.86 -1,312.93 5.812 31.66 656.09 -413.90 FAIL-Major Risk,CC 10,369.45 8,949.82 12,600.00 8,902.73 46.43 236.94 -87.01 -2,142.88 -1,505.76 5.812 220.71 657.01 -433.37 FAIL-Major Risk 10,369.49 8,949.82 12,350.00 8,919.75 46.43 236.76 141.64 -2,205.45 -1,264.84 5.812 40.72 656.78 -443.03 FAIL-Major Risk 10,370.37 8,949.69 12,450.00 8,915.71 46.44 236.83 -99.06 -2,181.57 -1,361.77 5.812 73.48 657.34 -558.02 FAIL-Major Risk,ES,SF 10,374.05 8,949.17 12,500.00 8,910.59 46.46 236.87 -91.68 -2,172.01 -1410.57 5.812 121.95 659.33 -528.23 FAIL-Major Risk 10,374.40 8,949.12 12,550.00 8,905.48 46.46 236.90 -88.73 -2,159.34 -1,458.65 5.812 171.39 659.56 -483.21 FAIL-Major Risk 10,375.52 8,948.96 12,300.00 8,919.67 46.46 236.73 120.75 -2,223.84 -1,218.39 5.812 65.22 659.89 -526.46 FAIL-Major Risk 10,383.87 8,947.78 12,250.00 8,920.65 46.50 236.71 114.34 -2,245.43 -1,173.31 5.812 132.61 664.19 -508.38 FAIL-Major Risk 10,392.73 8,946.55 12,200.00 8,921.76 46.55 236.69 111.56 -2,268.35 -1,128.89 5.812 180.68 668.71 -473.87 FAIL-Major Risk 10,402.43 8,945.22 12,150.00 8,922.47 46.59 236.67 110.31 -2,292.97 -1,085.38 5.812 228.80 673.61 -434.90 FAIL-Major Risk 10,413.45 8,943.74 12,100.00 8,923.47 46.65 236.65 109.70 -2,319.42 -1,042.97 5.812 276.64 679.12 -395.22 FAIL-Major Risk 10,424.48 8,942.29 12,050.00 8,924.51 46.70 236.64 109.43 -2,347.94 -1,001.92 5.812 324.01 684.59 -355.07 FAIL-Major Risk 10,437.13 8,940.66 12,000.00 8,925.89 46.76 236.62 109.43 -2,378.77 -962.59 5.812 370.69 690.80 -315.94 FAIL-Major Risk 10,450.48 8,938.98 11,950.00 8,927.16 46.83 236.61 109.65 -2,411.41 -924.74 5.812 416.81 697.24 -277.24 FAIL-Major Risk 10,463.45 8,937.38 11,900.00 8,929.23 46.90 236.60 109.84 -2446.10 -888.80 5.812 462.10 703.63 -238.93 FAIL-Major Risk 10,479.54 8,935.48 11,850.00 8,930.87 45.54 236.60 110.50 -2,482.62 -854.70 5.812 506.66 707.80 -199.44 FAIL-Major Risk 10,495.97 8,933.57 11,800.00 8,930.89 44.15 236.59 111.17 -2,521.07 -822.76 5.812 550.24 710.60 -158.97 FAIL-Major Risk 10,513.45 8,931.59 11,750.00 8,930.54 42.68 236.59 111.72 -2,561.56 -793.44 5.812 592.51 711.99 -118.24 FAIL-Major Risk 10,534.13 8,929.23 11,700.00 8,930.77 42.70 236.58 112.36 -2,603.78 -766.67 5.812 633.48 718.21 -83.69 FAIL-Major Risk 10,555.04 8,926.84 11,650.00 8,929.84 42.72 236.58 113.11 -2,647.53 -742.50 5.812 673.07 724.36 -50.37 FAIL-Major Risk 10,576.26 8,924.41 11,600.00 8,928.75 42.74 236.58 113.90 -2,692.23 -720.13 5.812 711.86 730.48 -17.80 FAIL-Major Risk 10,596.62 8,922.07 11,550.00 8,927.88 42.76 236.59 114.64 -2.736.86 -697.60 5.812 751.24 736.37 15.75 Pass-Major Risk 10,613.45 8,920.13 11,500.00 8,927.53 42.77 236.59 115.22 -2,781.31 -674.71 5.812 791.29 741.31 50.95 Pass-Major Risk 10,634.60 8,917.68 11,450.00 8,927.88 42.79 236.59 115.95 -2,825.71 -651.73 5.812 831.81 747.32 85.49 Pass-Major Risk 10,652.73 8,915.58 11,400.00 8,929.54 42.81 236.59 116.48 -2,870.35 -629.27 5.812 872.39 752.38 121.01 Pass-Major Risk 10,663.45 8,914.33 10,800.00 8,986.24 42.82 236.48 115.01 -3,169.15 -156.88 5.812 1,431.95 755.97 677.23 Pass-Major Risk 10,663.45 8,914.33 11,350.00 8,932.72 42.82 236.59 116.62 -2.914.52 -606.07 5.812 913.85 755.40 159.46 Pass-Major Risk 10,682.85 8,912.08 10,850.00 8,983.53 42.84 236.49 115.78 -3,167.40 -206.77 5.812 1,387.39 761.05 627.59 Pass-Major Risk 10,684.25 8,911.91 11,300.00 8,937.40 42.84 236.59 117.17 -2,957.05 -580.21 5.812 957.14 760.97 197.18 Pass-Major Risk 10,694.33 8,910.74 10,900.00 8,977.23 42.85 236.50 116.35 -3,164.71 -256.29 5.812 1,342.73 764.03 579.98 Pass-Major Risk 10,695.92 8,910.55 11,250.00 8,941.01 42.85 236.58 117.44 -2,996.96 -550.36 5.812 1,002.88 764.09 239.86 Pass-Major Risk 10,713.45 8,908.51 10,950.00 8,969.82 42.87 236.51 117.34 -3,156.92 -305.07 5.812 1,296.32 768.82 528.79 Pass-Major Risk 10,713.45 8,908.51 11,000.00 8,961.25 42.87 236.53 117.56 -3,142.67 -352.18 5.812 1,248.03 768.85 480.50 Pass-Major Risk 10,713.45 8,908.51 11,050.00 8,953.75 42.87 236.54 117.77 -3,122.61 -397.33 5.812 1,198.65 768.84 431.14 Pass-Major Risk 10,713.45 8,908.51 11,100.00 8,949.50 42.87 236.56 117.87 -3,098.01 -440.62 5.812 1,148.73 768.79 381.24 Pass-Major Risk 10,713.45 8,908.51 11,150.00 8,945.25 42.87 236.57 118.02 -3,068.21 -480.49 5.812 1,099.14 768.70 331.68 Pass-Major Risk 10,713.45 8,908.51 11,200.00 8,942.55 42.87 236.58 118.14 -3,033.83 -516.66 5.812 1,050.56 768.58 283.13 Pass-Major Risk 9/15/2014 12:50'49PM Page 3 of 4 COMPASS 5000.1 Build 61 I 0 BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 09-03 Project: Prudhoe Bay TVD Reference: 09-03A plan P237 @ 67.45usft(P273 plan) Reference Site: PB DS 09 MD Reference: 09-03A plan P237 @ 67.45usft(P273 plan) Site Error: 0.00usft North Reference: True Reference Well: 09-03 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore Plan 09-03A Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan#5b 09-03A Offset TVD Reference: Offset Datum I Reference Depths are relative to 09-03A plan P237 @ 67.45usft Coordinates are relative to:09-03 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927(Exact solution),Alaska Zone 04 Central Meridian is 150°0'0.00 W° Grid Convergence at Surface is:1.66° Ladder Plot 1400 -- — I ' , i u . —I n I S'1050r_. — —_ o fi I in M 4 C 4 1 I O. 1 co eL cn 700 i — , — a i— { c E 350 s 0 " — . ! : d 0 0 2000 4000 6000 8000 10000 12000 Measured Depth(2000 usft/in) LEGEND -*- 03-33,03-33,03-33 V2 03-33,03338,03-338 V3 Plan#5b 09-03A 03-33,03-33A,03-33A V1 ^ 03-33,03-33C,03-33C V0 9/15/2014 12:50:49PM Page 4 of 4 COMPASS 5000.1 Build 61 • 0 P rortcet ::,)rEr DS 43ay Well 09-03 Wellbore Plan 09-03A Design: Plan#5 09-03A From 4900md (300'md above planned KOP)to TD From Colour To MD Scan interal 25 ft Scale 1 inch :50ft 0 4900 03-31A fails the major risk well passes a risk 1:50 rule 4900 5200 See AC summary report for detailes 5200 5500 5500 6000 0 6000 6500 151 6500 11900 -':,. ..-------------------------.-----i 30 , -— 12200 12910 .----;/:::--...:-•••.:::-....<- 300 44.1101.1P- 11----- ------------------ 75 60 . . . , • . .- , .- ., .-• -. •-• -:. -,-- ..... . . . . . . . . . . . . . „ , . • . . . . . . . 4 ' i , i ! f i ,: : F i 5 ; i / / .1 .-.' ,--- --:., ,. '.. 't ': ,. • .: 1 ,i,-.4 : : : : „,-,. 4i 0 75i :i :--- :-:.:-..-.. :, ! ;;. 90 ''' -177. ci.;L''%1INI 4.03:V2 ' , \ , ,...-- -.;41"-7 -1 fr<TO ‘ ''. '', \ '', '-.. -:,.,-- - .../ x' ";ili „,'” , j I ; I I j ,,IJ 106k, \ ''.. ''.... ...-- -.. ..-/ ' .446 1 i ; I '... •.• , '-. '1"-': --- -: s /5599 •--1.:".--t,--T-. - \ \ \ \ \ \ \ \ '''... \:':,:•:`:-:- ".\-:\--.."--••••:::-.- -- 13,-/210 -.,-/ .•• / / 1 /I I ! : i / ; I / 60 0316 75 . . 210 C----i*; UR'--- :-.-\.1-\;.,,----. --1,----- ---' '150 ..-----. ...! (-1: :::''-"`:-' • ----------- --7,-"'--- ------ .=.';',"--"." .1--i-- —.-..-::;-- ' ------ aiiireall 180 Azimuth from North[1 vs Centre to Centre Separation[41 usft/in] • • N N - N - N -- 0 . ', _ N __- _-. -.... _N -. _ .n irS . _ O I. I _ N • .. -. - N ' _-.-- L_ -N to _O ' _ N N , . j. _ N W 7 : : , _ CD . : . _ Q - 0 ._.. _ N ID - N 7 _ (SS N - o ----- — — 0 I - - . - N N- .._._._-- ------ 'N---- - --------. -_._--- + ----- - --- ----- _. ---------.4 ------'-------4- -----, ---___. to co '., N N -.-- _.__ --____. -_-__-_- .. _.._.._ • - _-____-• - . o>, () a) < j _ 1 NCD OW 1 a.)O O I Q'oOOn -' N ECOC6 lS 1.0 O 9 N _..- __._.... .._____. ._..._.__._ _______ ._--___ ._.__._ ...._ ._..._.._... .._ _.._._._._ '-_. N o_ Q � : (toN - 0 11 I I I I 1 I I I I I I I I I I I I I I I I I I I I I I I I 1 I I I I I I I I I I I I I I i I I I I j I I I I 1 I I I I 1 i I I I N 0 N 0 N 0 N O N O N O N O N O N- co co co N 7 7 M M N N (ui sn pi.)uogquJpdas ai uao of ailueo • • 25 i 0 W (n 88 / S , 0 c, r (V M 0 H. DON 40 Hinos • — - — - - CI t - — —— C.) 0 tf (1) kr. tu c 4:1 c) E e ) J t i]AI. 0 • C) U 1 L _ J U) 0 (I) C I cel ("".•1 t (1) Cs/ C ...... ....... 0 I 0 8 ki) c tIJ 1 CL 0 0 8 CA, co LA 2 t J)am_ • • OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. • 111 TRANSMITTAL LETTER CHECKLIST WELL NAME: /LC 1-29' —0 PTD: / Development Service Exploratory Stratigraphic Test Non-Conventional FIELD: (--/reA-44 POOL: 7`(-4. - 4).6' Check Box for Appropriate Letter/ Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI LATERAL The permit is for a new wellbore segment of existing well Permit (If last two digits No. , API No. 50- - - . in API number are Production should continue to be reported as a function of the original between 60-69) API number stated above. In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name Pilot Hole ( PH) and API number (50- - - - ) from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce / inject is contingent upon issuance of a Spacing Exception conservation order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: Production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application,the following well logs are Well Lo ,n also required for this well: gg g Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 4/2014 a • 0 co D a) Q N cn E N y, N, L. ay W > N, m CES Q`o. o. O' w fP .cay E, D a> mi 3 c E O aj ! : oo U y° a, O' a f6; N. C � °. o C' a> o , '5. co' m w' o. > Q ° E a>, a 6 ° O, 'O' CO' To Q• j CO, a � , a 0 O O co •E' 0 >o O) CL O ; 3 < • Cu Cu; o; ov , ocyo ai, O• o, .., CO M� O. C°, � m M C= >. U. °. `a '6 M Ca a> O C, = O a). co �, E .CO CO •C a L DD. Ce. H, g N. m• c CO. •, -p u> N. 3. , '5, u. t. a' ° a V/ 0 Cuq N a. , C�. }. C' 0. V�. C�. Cl) v°> Z� C, C. C D. .a �� �, E , L. a>. CD. N. o) 0) o. :a w. , 3. , a) O , 3, m a. CO Q O. y, .— . C. a M. d �. _. 0,, _, a) — w' N O O o O N N. O E.E 0 a) , O' d o o' U. c. >' W (6 •=. , €, aoi� 3 0 Z m a' 0. a, yccci yccyi c, , m 8 , o, a, E ay ,, z -C c 0 a o, 0, j j o, ai � c Cu, a, N 0 Cu, w w a, U• 0 , U, CO (. a, , M.. a a. , g, I D. 0 a, ] , w Cl> Cu Cl) U> Ti C, Cu 8 Cl) Cl) U) Cu, 1 Cu Cu Cu Cu Cu Cu Cu 1)'', u Cu' Cu Cu , Cu a' a) a), a). a>, aa). a>. a). a), a>. a). a) a, a. a. a. a. a; a, a, a), a>. a>, a). a>. a, a), a). a). a). a>, a), a; 0, o. Q a. a. .� p z; >- >-, >- >, >, >, >, >- >- >- > >, z, z, z, z, z z, z, z, }, > } } } Z >-, >- >, >, > > z, z >, z z z, •-, >, • N. U ° .Y , . , , ows t . , o a o Oc U S � N co .y O. , �, U� C , o Jco E O OL �, a) .J a). E. � U co s Oa 1a ' y ' ' � �� D L°. ItIll , C$' hI N .0, ado, C-, N. C, a >. ; N' E' OO C, N$, U , a �. g, a•. -p `>o uDY . ea' w°r � '� o' M a �' vi' ayi' m `ai CO V L' ` y' O, _, 3• a). Cci, c, _CD L. M. W — 4, p. c. �. o; a)0. C in. m, S `a. D. a ;. m. 00 ), w a N, C Cr a ° ° 2, a> O E'. E o v. 5, c. E. m, 3; co •N. -�, ... �. a , c. o a). o )-. y T o a ai ,. o C' S v. a c. m, w o o ¢ °' c' -=0; 0 'o a. c a0 . o. a . . c0 3 >, �, Y 0 0 D 0• C. C, 0. :_+ o, C. O' O a> (0. ° C, •ca. C. Q. N. L. C/> V, Q rn O a) a) W < ' L' 0' a)' O 0 0 C a) _. N. O. E, T a> c. o, U U m. , �. o 0 0. c °, m Z. o E. E. 3. °' o. y, r m, 3, E a a ' .O.a j' a N N .0. oa. CO' O. L• L• a. CO' O, c' -O, �. `. C. 0- a) N. N. �. 09 p tl)• a O: 3' O' •C o' T . C E a). G 'O, CO. 4 a -O. O• m, co . 0. 0 a. M. f0• N. 0 it. a> 0' ,� O. C, O, 0 w ° IT) z a c, w, y. �; -5, o. -Q. c' 3. 3. �. o. �, .., o, �. a. =, o = �. a4i o' rn. a 'a 5. Cu o. 3. o L• . w, U O_ o -. v. > o a), a v. v. o o. 'E, a c o' o' o' o' c Q o. U) 'o. m, coo, o c. v. a u) = a> a -a> m, d m a) CD �, Y, o, o' E' a> E' « o, a) c ~ a) a O. -0 co. o N 32 N n v=)� uai. a c' d' N a, a o' d'. 0. — - a) �' 2 -O O E cf a. ' ea y. C ° C O -O a' U. O. E. Cu. O, o, m a) ..- g, w, N, O. ..L.,, '-, 'C, N. °' 0- W m O' O' t0' O '-' o o, 3 = C D' ° N O. a Ty s, as, m C. a a 0, 3' ' `°' a> a> a). 3, C. • 00) C C 0. a 0. c. c, a, t •5. o a) @. 0, = a' a> N. >. 5 a> GL J Cu co)-, C V• 0 V U N C a, L, L. -C. -Q. w' N. y. -7) a). N, >. .� m L, a°>. a w Cu. U. O' L. C. O. C, E, a a) a> m m, Q. c' v v o „, _ 3' v' o. ° C o, a> C m. c. X ._, E a> �p d ° L' o m; w '3' = a>' $, Li, , m' 0 0' y y v o' E °' �p rn m c°.>', c, Ir. w a). _. 3• U f0, f0 C. tU U- Y -, O, O. >. —. O• w 0. �. E - C. U O. C U U O O U C' U. N, O, O, CO, V. O a a) C 0 a> O' O' O' 5, 5. a> Q o. C, = U > > 3' c, = _ �. O) , 3 _co' co w d N' U -� Co E w Q �. 'a, ,. ,D E E a a). a $ v' m H. c. o Q �. c a' a' Y' E m; vE>; 0 �? �o y aal - , Y m m v a a m' ai (Ti d' 3. a> o o 2' 2' 2' m. Sr ud -o. = 0; 0; r; °' a a) m as 'a>, a1),); o; p i' a: _, n �' �' �' c, 4; O O a; a, U �' ¢' a z; v; c, U, U', U; c.., a, a. -. o' m. m. c.�. . N' a, D; CO, 0). U. Cu N n' - N CO 10 CO I- CO 0) '� E 0 N M V l0 CO 1� COW 0) 0 e- N CO(M CV C0 COCV n COC-I (A 0 N M V co co h co 0) r' N N N N N N N N N N CO CO CO CO CO M CO CO CO CO U v . v 0 o a) CD C N N w Fs.,,, O N U o CO O CCS N N O.N n_ rn •rn ca v C o m E C� c y 0 E 43) • C ° D U 0 a c Q cc Q U) CL a a