Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout183-136Originated: Schlumberger PTS - PRINT CENTER 6411 A Street Anchorage, AK 99518 (907)273-1700 main (907)273-4760fax Delivered to: AOGCC -. _. ATTN: Natural Resources Technician II Alaska Oil& Gas Conservation Commision 333 W. 7th Ave, Suite 100 ^Ay Anchorage, AK 99501 TRANSMITTAL DATE TRANSMITTAL # 183136 31478 Schlumberger -Private STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑ -. Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑. Plug for Redrill ❑ erforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: CEMENT SQUEEZED 2. Operator Name: ConocoPhillips Alaska, Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Development ❑ Exploratory ❑ Stratigraphic❑ Service ❑ 183-136 3. Address: P. O. BOX 100360, Anchorage, 6. API Number: Alaska 99510 50-029-21012-00 7. Property Designation (Lease Number): s. Well Name and Number: ADL 25652 K RU 1F-12 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s): N/A Kuparuk River Field / Kuparuk River Oil Pool 11. Present Well Condition Summary: Total Depth measured 6,840 feet Plugs measured None feet true vertical 6,288 feet Junk measured 6670, 6838 feet Effective Depth measured 6,738 feet Packer measured 5647, 6320, 6537 feet true vertical 6,194 feet true vertical 5235, 5815, 6010 feet Casing Length Size MD TVD Burst Collapse CONDUCTOR 76 feet 16 108' MD 108' TVD SURFACE 2,223 feet 9 5/8 " 2,254' MD 2243' TVD PRODUCTION 6,788 feet 7 6,819' MD 6269' TVD Perforation depth: Measured depth: 6568-6628 feet True vertical depth: 6037-6093 feet Tubing (size, grade, measured and true vertical depth) 3.5 " J-55 6,558' MD 6,029' TVD Packers and SSSV (type, measured and true vertical depth) PACKER - BAKER HS PACKER 5,647' MD 5,235' TVD PACKER - CAMCO HRP -1 -SP PACKEF 6,320' MD 5,815' TVD PACKER - BAKER FB -1 6,537' MD 6,010' TVD SSSV -NONE 12. Stimulation or cement squeeze summary: Intervals treated (measured): cement squeeze 6300.6515 MD Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: SHUT-IN Subsequent to operation: SHUT-IN 14. Attachments (required per 20 AAC 25.070, 25.071, a 25.283) 15. Well Class after work: Daily Report of Well Operations El Exploratory ❑ Development El Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil O Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP❑ SPLUG❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 319-326 Contact Name: John Peirce Authorized Name: John Peirce Contact Email: John.W.Peirce@cop.com Authorized Title: Sr. Wells Engineer � contact Phone: 907 265-6471 Authorized Signature: L✓ ' ' Z � '% ; Date: Form 10-404 Revised 4/2011 V/�w7 /��/,7 //� IB MSIYACT 0 9 2019 Submit Original Only C0nocaPUllIps Alaska, 11 c. KUP PROD WELLNAME 1F-12 UNIT WELLBORE 1F-12 - u-lg nrvwzgna nnpa3 PM _._ __..._ _..._..... .._..., .,,.,,,tea., Last Tag Velpa enema&Lmu.B Anwmmn Corn(XKEN IFna Oale Wenbore Iutmm as Last Tap ,634.0 1022019 F-1 rergUsp IMxGeR', ns- Last Rev Reason Annohrnn a. Date Wellborelastmm Rr Revlila))GLD& Show SQZD C Sand Peds MdMandrel SQZ 10131419 F -t Ienna0 CasingingSStrings Casing 0eaniplion GO nnl mDid i: P: IXKe) $el Depth lRlce CONDUCTOR 16 15.06 320 108.0 lI Ie nVDIL.. W .(I.. Grme Top TMW 1080 M.H-40 WELDED As. c0x0uc)OR;Sag-faaa Lxiiq Oeaniption OD (In) ID (in) Top(XKHI Set 0epM (IIKRI SURFACE 9518 863 30.9 2,254.0 SN OepM (NOI (... Wtllen ll.. Grme Tap TM1reaE 22633 4000 J-55 BTC Casing D..,.pL.n OO pn1 IO llnl Tap (XKej Sel Depth (Rno, PRODUCTION ) 628 369 61119.0 9N OepIh nV011... Wllten R... Gra]e Top TM1Rm 6,268.8 2640 J-55 BTC Tubing Strings SURFACE; b93354.0� Tubing pescnpllon SRI. a...1O pn) Top(XKB) 5e1 0epth M... Set Depth(ND) IX. SZSf 1 Gratle Top Con... 31/2-RW02019 31!2 2.99 21.3 6260.8 57)9.2 530 LBO TUE Completion Details GAS UFT; 2,AST5 Top OVD) uaminaI Top(XKB) IRKS) Top Incl(') Item Des Com 2).3 2).3 0,11 HANGER FMC 3117 Tubmp Hanger w/ pup 3.1/ 2' EUE larear, 2.592 56275 5218.5 33.32 SEALASSY Baku 1O'S.]ASSemNy 00-40 Spaced OM,'Oft No-go 3.000 GAS UFT; 0WS 5,629.8 5,2285 3330 PER Baker PB. -8_ 4.000 Stroll 6234] 33.1) PACKER Baker)' x 31/2' HIS Packer 2950 GAS HI'D SOU7 5,696.3 5.2762 32.80 NIPPLE HES 3112 x 2.813'X Dpple Prefile W1281 XX positive plug SUN ad 2.813 ISN2662-9) 6,273.3 5,773.1 274) OVERSHOT 9aker35'x T'Poorbgr Overshot 6.84'ofewa6ow. FULLY 3.630 LOCATED GAS OFT 56x3.1 Tubing Descrlplien n"Mae. lD (n) HUCfiMG LEFT IN JV2 2.99 Top(we 6,280,0 set p<pin (R._ 6,537.4 6e1DepM1ND)(X 50101 WfOWXI 930 One, J-55 Top Connectbn EUEBN SEAL ASSY; 5.837.5 PSR.Gspa Completion Details Top (WD) Nominal Top(XKB) INS) Topin[Il-) Item Opp Co. 10 (In) 62971 5,7942 27.14 SBR CAMCO OEJ SBR pg3) PALKER',sae6.a 6320.1 5.814) GRAF PACKER CAMCO HRP --SP PACKER 2.66 6,430.5 5,9136 25.87 BLAST RING QUADRA FAL BLASr RINGS(2) 2.Sfi) 6,5308 6,0042 2502 LOCATOR BAKER LOCATOR SUB y,ggp NIPPLE5.6W.3 6,5314 6004] 25.01 SEALASSY BAKER SEAL ASSEMBLY 3.000 6,536.9 QODE. 24.94 SHOE BAKER M LE SHOE GUIDE 2992 Tulin 0acr, pilon Shing Mei.. oPq Tap(XKB) 5el peplh (X.. &el0eptnlND)IX. WI(Iml[) Grme TOp Conrw.tnn PACKER ASSY 3112 2.99 6587.4 6.SS6.fi 6,0294 9.30 }55 EUEBN pVERSHOi; SP3.3 Completion Details Top RVER Nominal Top(XKR) (XKO) iopinc1 r) Ihm Des Com IOliin 6,5374 6,010.1 2493 PACKER AKER F&1 PACKER 3.000 6540.0 60125 24.90 MILL BAKER MILL OUT EXTENSION 2,992 SBR;6,a7,1 PACKER LFAK; 6.3300 - 4 5,5522 6,023.6 2434 NIPPLE CAMCO D NIPPLE 2150 655)7 6,028.6 2466 SOS BAKERSHEAR OUT SUB,ELMOTTL@6543' during PPROFon 3.000 519112!08 PACKERISa0n Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) -r Top (WON Top NO GASUPTSasi3 c[mam 34mezq k30]a S GUM LEAK S,DSA \,!' - Top(XKB) (XKDI (') Oea Co. Run Oele 10 (in) S,3Z9.0 58148 26.85 PACKER, SUSPECTCASINGLEAKATORNEAR PACKER, PUMPEDIBPM AT 2400 PBI THRU OPEN POCKET TO FORMATION, BASED ON IDL PERFORMED I/42019 1IW2019 fi.280 GAS LIFT:1.401O S;. 6 24.1 5.907.9 25.92 GLM LEAK Leek in lower GLM a 11412019 fi.280 cmT sgz flRING a,4lan� B.Z 6.4 1GS64305 6,670.0 6.1313 22.98 FISH MILLED CIDP@ 6515 AND PUSHED TO66)0' RKB - 9/29!019 0.000 6,836.0 6,26fiA 22.5) FISH KOT TRAYLOST HOT TRAYWRATHOLE )ly1998 Perforations & Slots Trip (NO) etm (NO) Dens Top (RNB) O[m (XKDI(XKB) 1XKB) Linketl IDna Oale (shats'll) Tyce Com GAS LIFT; 6,4S53 6434.0 6,470.0 5.916.8 5949.2 10/27/1983 12.0 CMTSQZ DA5`cagguns UPAI.RS5a09 6,568.0 6,5760 6,03).0 6,01521AA 112411984 1 4.0 IPERF DA 2116 BOWPDP 11 SEAL Assn 6,5314 SKOR;8.5389 PACKER; s,Hn.4 6,588.0 6,626.0 6,056.1 5D9271- 124/1984 4.0 IPERF DA2118BarKRnell 6,588.0 6,628.0 6, 56.1 6,092) Ate, I - 62911984 I 2.0 I PERF 12 IM Link Cane MILL SWA Cement Squeezes Ter(NO) ani(ND) NIPPLE; afifizz Top(XKB) Btm(XK0) (XK01 ("Sir DesSmn Dale Com 6,300.0 655.0 796.8 5, .B CementSgueeze 9/1&2019 Mbb 1. 6p11dSrlQlSmentfi1ueezadinta35"x7` pr0duCmn string l 5 bills lased In 3S tubing '^^" MILLED CMT IN TUBING--- 61290019 Mandrel Inserts se ani SO&: fi.55T.] iop(NO)W Wive laRh E'ree" TRO Run No Top IttKB) Etta) Make) &ery Type Type (In) (ps) RgnOah1 250).6 2!85.4 Cam. GASLIFT GLV RK 0.188 1244.0 10l&2019 2 3868.5 3794) Cam. GASLIFT GLV RK 6166 1,246.0 1022019 3 5,016.8 4R2i Camco GASLIFT OV RK 1.250 0.0 1022019 PERE SESSoISVID L5 4 5,6022 5,19)4 Camc-0 GASLIFT DMY RK &2112019 635/2 5,84)9 Cam.i PROD OPEN SEK )12912019 SQZD 6 8,4241 5,90).9 Cam.1 PROD CV Broke6,4952 59)19 Cam.1 PROD OPEN REK )1292019 SDID HaK; 66m.a Notes: General&Safety End Date Annotation &2) 019 NOTE View Schematic w! Alaska SCMmatK100 PROOUCHON: a0.a6,S19.0 FISH', 69x8.0 1F-12 CEMENT SQUEEZE DTTM JOBTYP SUMMARYOPS START 9/17/19 ANN TAG DB PLUG AT 6515' RKB, PUH 10' AND CIRCULATE A BOTTOMS UP WITH COMM DIESEL, WHP AT 1700 PSI, DISCUSS WELL CONDITIONS WITH TOWN ENGINEER, ORDER 100 BBLS OF 11.2 PPG SODIUM BROMINDE, RESTART IN AM, JOB IN PROGRESS. 9/18/19 ANN RIH WITH BDJSN, TAG CIBP AT 6515', LOAD WELL AND COIL UP WITH 11.3 COMM PPG BRINE TO TRY AND BALANCE THE WELL, CONFIRMED INJECTION INTO THE WELL AT 1 BPM 1400 PSI. BATCHED UP 34.5 BBLS OF 15.8 PPG CLASS G CEMENT. 33BBLS BEHIND PIPE 1.5 BBLS IN TUBING..DROPED .5" BALL TO CLEAN OUT DOWN TO 6300', BALL RECOVERED. TOC 6300' ISH. WAIT 72 HRS FOR DHD WORK. JOB IN PROGRESS. 9/22/19 ANN (AC EVAL) DDT -T TO 0 PSI (PASSED) COMM 9/26/19 ANN REMOVE AND REPLACE MAIN POWER CABLE TO COILED TUBING MAST. COMM FUNCTION TEST ALL SAFETY SYSTEMS AND CHECK FOR CABLE CONFLICTS WHILE TROLLEYING WINCH. RIH WITH 2.70" OD TWISTER MILL. TAG CEMENT AT 6,164' CTMD. MILL TO 6,247' CTMD WITH FREQUENT STALLS. POOH RDFN. 9/27/19 ANN MILL CEMENT FROM 6,192' CTMD TO 6,266' CTMD WITH 2.79" AR MILL. MILL COMM AND MOTOR WERE STALLING FREQUENTLY. ELECT TO POOH TO CHANGE TO HIGHER TORQUE MUD MOTOR AND LESS AGGRESSIVE MILL. RIH WITH 2.73" OD CONVEX AR MILL. TAG AT 6,274' CTMD. MILL TO 6,303' CTMD. MILLED 111' OF CEMENT. POOH. SWFN. 9/28/19 ANN MILL CEMENT FROM 6,305' CTMD TO 6,385' CTMD. POOH AND CHANGE BHA. COMM TO 2.73" OD PDC MILL. RIH MILL CEMENT FROM 6,387' CTMD TO 6,491' CTMD. SWAP TO DIESEL. PERFROM INJECTION TEST. PUMP UP TO 1,600 PSI AND OBSERVED BLEED DOWN 90 PSI IN 10 MINUTES. SWAP TO 10.6 */GAL BRINE. PROCEED TO MILL CIBP. MILL FROM 6,491' CTMD TO 6,508' CTMD. DID NOT OBSERVE MOTOR WORK. PICK UP CLEAN TO CHECK WEIGHT ON BIT. RIH AND STALLED, TAGGED 3' HIGH AT 6,505' CTMD. POOH OBSERVE OVER PULL AND INCREASE IN CIRCULATING PRESSURE, PICK UP TO 6,434' CTMD PULLING HEAVY. LOSE RETURNS. REPEATEDLY ATTEMPT TO COCK AND FIRE JARS DOWN AND THEN UP. NO INDICATION OF JARS FIRING. 9/29/19 ANN CONTINUE FROM MIDNIGHT REPORT, SURGE COILED TUBING X TUBING 12 COMM TIMES, STARTED TO SEE MOVEMENT WITH COIL, OOH WITH PDC BIT, MAKE UP VENUTRI, RIH TAG AT 6400', COULD NOT MAKE HOLE, VENTURI FOR 30 MIN, OOH CHECK VENTUI BASKET, HAD FEW SMALL CHUNKS OF CMT IN MULE SHOE, MAKE UP TWISTER MILL, RIH TAG AT 6505' MILL DOWN TO 6650' CTMD 6670' RKB, WELL FREEZE PROTECTED WITH 30 BBLS DIESEL. JOB COMPLETE. 10/2/19 DRILLING TAGGED TD @ 6634' RKB. SET BAITED HOLEFINDER @ 5204' RKB. PULLED SUPPORT - DMY, SET OV @ 5017' RKB. PULLED DMY, SET GLV @ 3869' RKB (TESTED TBG CAPITAL TO CONFIRM SET). IN PROGRESS. 10/3/19 DRILLING REPLACED DV W/ GLV @ 2508' RKB. TESTED TBG 2000 PSI. PULLED BAITED SUPPORT - HOLEFINDER @ 5204' RKB. JOB COMPLETE. CAPITAL 10/02/19 DRILLING TAGGED TO @ 6634' RKB. SET BAITED HOLEFINDER @ 5204' RKB. PULLED SUPPORT - DMY, SET OV @ 5017' RKB. PULLED DMY, SET GLV @ 3869' RKB (TESTED TBG CAPITAL TO CONFIRM SET). IN PROGRESS. 10/03/19 DRILLING REPLACED DV W/ GLV @ 2508' RKB. TESTED TBG 2000 PSI. PULLED BAITED SUPPORT - HOLEFINDER @ 5204' RKB. JOB COMPLETE. CAPITAL ORIGINATED ALASKA E -LINE SERVICES 42260 Kenai Spur Hwy PO BOX 1481 - Kenai, Alaska 99611 PH: (907) 283-7374 FAX: (907) 283-7378 DELIVERABLE DESCRIPTION TRANSMITTAL DATE: TRANSMITTAL #. 1. � Kuparuk 31168 BP North Slope 0 1 0 0 ECA, PBOC, PRB-20 (Office 109) D&C Wells Project Aids 900 E. Benson Blbd. - Anchorage, AK 99508 Conoco Phillips Alaska Inc. 1 0 0 Attn: NSK-69 RECEIVED 700 G street SEP 0 3 Anchorage, Alaska 99501 2019 0 1 0 TTN: Natural Resources Technician II laska Oil & Gas Conservation Commision 33 W. 7th Ave, Suite 100 - Anchorage, AK 99501-3539 1 DNR 0 0 1 1 Attn: Garrett Brown -Geologist I DNR, Division of Oil & Gas 550 West 7th Ave, Suite #1100 - Anchorage, AK 99501 return via e-mail a copy to both Alaska E -Line Services and Cc6&o Phillips Alaska: WELL LOG TRANSMITTAL 4905869479 To: Alaska Oil and Gas Conservation Comm. Attn.: Natural Resource Technician 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: Plug Setting Records: 1 F- 12 Run Date: 06/12/2019 and 07/29/2019 1 93 1 :3 31121 August 5, 2019 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 FRS—ANC@halliburton.com 1F-12 Digital Data in LAS format, Digital Log Image file 1 CD Rom 50-029-21012-00 RECEIVED AUG 272019 AOGCC PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-275-2605 FRS_ANC@halliburton.com Date: ( u / l Signed: WELL LOG TRANSMITTAL #905751664 To: Alaska Oil and Gas Conservation Comm. Attn.: Natural Resource Technician 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: Leak Detect Log with ACX: 1F-12 Run Date: 6/9/2019 183136 3 109 4 August 5, 2019 RECEIVED AUG 13 2019 AOGCC The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 FRS-ANC@halliburton.com 1F-12 Digital Data in LAS format, Digital Log file, and Interpretation Report 1 CD Rom 50-029-21012-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-275-2605 FRS_ANC@halliburton.com Date: 3/-/ �cp Signed: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS JUL 18 2G15 1. Operations Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑� Operations shutdown Performed. Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ erforate New Pool ❑ Repair Well El Reenter Susp Well ❑ Other. ❑ 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: ConocoPhillips Alaska, Inc. Development ❑p Exploratory ❑ Stratigraphic❑ Service ❑ 183-136 3. Address: P. 0. Box 100360, Anchorage, Alaska 6. API Number: 99510 50-029-21012-00-00 7. Property Designation (Lease Number): 8. Well Name and Number: )(RU 1F-12 ADL 25652 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s): Kuparuk River Field / Kuparuk River Oil Pool 11. Present Well Condition Summary: Total Depth measured 6,840 feet Plugs measured None feet true vertical 6,288 feet Junk measured 6838 feet Effective Depth measured 6,738 feet Packer measured 5647, 6320, 6537 feet true vertical 6,194 feet true vertical 5235, 5815, 6010 feet Casing Length Size MD TVD Burst Collapse CONDUCTOR 76 feet 16 " 108' MD 108' TVD SURFACE 2,223 feet 9 5/8 " 2,254' MD 2243' TVD PRODUCTION 6,788 feet 7 6,819' MD 6269' TVD Perforation depth: Measured depth: 6434-6470. 6568-6576. 6588-6628 feet True Vertical depth: 5917-5949, 6038-6045, 6056-6093 feet Tubing (size, grade, measured and true vertical depth) 3.5 " L -80/J-55 6,558' MD 6,029' TVD Packers and SSSV (type, measured and true vertical depth) PACKER - BAKER HS PACKER 5,647' MD 5,235' TVD PACKER - CAMCO HRP -1 -SP PKR 6,320' MD 5,815' TVD PACKER - BAKER FB -1 PACKER 6,537' MD 6,010' TVD SSSV -NONE 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: e e m 1300 60 Subsequent to operation: 150 750 1550 1200 1120 14. Attachments (require4 per 20 MC 25.070, 25.071, & 25.283) 15. Well Class after work: Daily Report of Well Operations 21 Exploratory ❑ Development 121 Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil p Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP❑ SPLUG❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or NIA if C.O. Exempt: 319-220 Contact Name: James Hayes Authorized Name: James Hayes Contact Email: james.c.hayes@cop.com Authorized Title: Sr. Wells Engineer CContact Phone (907) 265-6927 11r f Authorized : : i SignatureDate% C7 f Form 10-404 Revised 4/2017 V %L -1/-f//l �,/� Submit Original Only ///«"" rrj/T(/7�®MSLL�✓JUL 1 9 2015 �. KU P PROD NAME 1F-12 WELLBORE 1F-12 ConocoPh ��" Well !tributes ��^ �kNrt t����p$ WELL Mu Angle 8 MD TD NdEkB. UIC. IKI l000i iv o��.�o I_...'....:. P'""•" L�elloa.uuwa Ilncl fl IMD mKBI ....n -- CONDUCTOR: SORFg E: SO.94SSWO� OR6 OVERSKOT: MKER LEAK .I ER: IPERF', S,Aif.pBA]11,0 BUST SI :S,UJO OAS LIFT, S HX,2 LOCATOR: EMS SEAL ASSM 4591. A. SHOE: 8.5145. PAOMR: EWA. MILL: E.1. NIPPLE: BSS= 2. SOS: S. 551. 7 -PERF. BSSA OSSR.0- IPERF', S,W. ,M0 (PERF: S,SSSOS.SS OY IOCIION: MS'SAIBO FISH. 45U,0� Slots Com Cam L.h Operations Summary (with Timelog Depths) 1F-12 F6 Rig: NABORS 7ES Job: RECOMPLETION Time Log Start Time EnO Time Dur(m) Phase Op Code Activity Code Time P -T-% Operation Start Depth (ftKB) Ertl Depth(ftKB) 6/14/2019 6/1412019 8.00 MIRU MOVE DMOB P R/D berming around the rig. R/D tiger 00:00 08:00 tank and hardline, cuttings box. L/D derrick. 6/14/2019 6/15/2019 16.00 MIRU MOVE MOB P Move pits and shop from 1G-16 to 1F- 08:00 00:00 12. Stage up on pad. Move sub to 1 F. Lay mats around cellar. Pull sub over well and set down. Back pit up to sub and set down. 6/15/2019 6/15/2019 4.50 MIRU MOVE RURD P Spot flow back tanks. Raise derrick. 00:00 04:30 Accept rig at 04:30. 6/15/2019 6/15/2019 3.00 MIRU WELCTL RURD P Take on 11.6 mud. Prepare rig floor 04:30 07:30 and cellar for well kill ops, install secondary valve on IA. Begin to load and strap DP into shed. 6/15/2019 6/15/2019 3.00 MIRU WELCTL RURD T Lubricator would not function in the 07:30 1030 down stroke. FMC rep went to warehouse and retrieved alternate lubricator. 6/15/2019 6/15/2019 1.50 MIRU WELCTL MPSP P R/U lubricator. Test to 2000 PSI - 10:30 12:00 Good test. Pull IS -A BPV. Trouble getting down to BPV due to surface safety valve bleeding closed. R/D lubricator. Tubing PSI = 1500 IA PSI = 1350 OA PSI = 200 6/15/2019 6/15/2019 0.50 MIRU WELCTL RURD P R/U circulating equipment to kill well. 12:00 12:30 Pressure test hard line and circ equipment to 2000 PSI - Good test. 6/15/2019 6/15/2019 0.50 MIRU WELCTL SFTY P PJSM W/ rig crew on killing the well. 12:30 13:00 6/15/2019 6/15/2019 5.00 MIRU WELCTL KLWL P Pump 11.6 PPG NaCl Mud 380 Bbls 13:00 18:00 out to tiger tank before clean 11.6 PPG returns. B/D tiger tank. R/U to take returns through poor boy degasser. Pump additional STS volume taking returns to pits. 6/15/2019 6/15/2019 1.00 MIRU WELCTL OWFF P SD, open IA- no flow. Open tubing - 18:00 19:00 slight flow (pencil width or less). Flow tubing 1 hr. OA 800 psi 6/15/2019 6/15/2019 0.50 MIRU WELCTL CIRC P Circ 20 bbl 4bpm 400psi down tubing, 19:00 19:30 through poor boy degasser to pits. 6/15/2019 6/15/2019 2.00 MIRU WELCTL OWFF P SOtoobservewell. IA -no Flow, 19:30 21:30 tubing slight Flow (pencil width). Flow tubing one half hour. Shut in tubing 30min - pressure barely registered on pressure gauge. Leave IA open - no flow. 6/15/2019 6/15/2019 2.00 MIRU WELCTL OWFF P Open up tubing, slight flow, spurts of 21:30 2330 flow, gas reading on LEL detector at outlet. Leave tubing open - sporadic flow, LEL reading 0-40ppm. No flow on IA for four hours, break off opposite side plug in bull plug and observe VR plug. Call valve shop for removal of VR plug. Break off flange and install annulus valve on opposite side. Valve shop personnel removed VR plug through valve. MU to flange to be able to circulate across well. OA pressure 500psi Page 117 Report Printed: 7/8/2019 Operations Summary (with Timelog Depths) 1F-12 Rig: NABORS 7ES Job: RECOMPLETION Time Log Stan Time End Time Dur (hr) Phase Op Code Adivity Cotle Time P -T -X Operation Stan Depth (flKB) End Dept (flKB) 6/15/2019 6/16/2019 0.50 MIRU WELCTL CIRC P RU and reverse circulate tubing 23:30 00:00 volume, 64bbl 11.6ppg down IA up tubing, 3bpm, 500psi. Well fluid packed, no losses, taking samples the duration, 11.6ppg returns at every sample check, mud appears aerated. 6/16/2019 6/16/2019 1.50 MIRU WELCTL OWFF P Open tubing - no flow, open IA, slight 00:00 01:30 flow. Observe vacuum on tubing, flow rate 2gal per hour on IA. 6/16/2019 6/16/2019 0.50 MIRU WHDBOP MPSP P Set BPV with dry rod. Pressure test 01:30 02:00 down IA with 11.6ppg mud l0 1080psi, good test. Lost 50psi first 5min, 10psi second 5min. 6/16/2019 6/16/2019 2.50 MIRU WHDBOP NUND P With IA open, ND tree, tubing head 02:00 04:30 adapter, found seals in poor condition. Clean threads on and plug control line. Check LDS. RU hoses and pump with charge pump 11.6ppg mud into one side of IA, taking returns out other side of IA. Strapping tank on regular intervals, no losses. Clean and check threads in hanger, install test plug. Install plastic packing. 6/16/2019 6/16/2019 3.50 MIRU WHDBOP 'NU -NDP- NU 7 1/16" 3K x 7 1/16" 5K crossover 04:30 0800 spool, DSA. Lift and land BOP stack. MU bolts on stack. R/D circulating equipment. 6/16/2019 6/16/2019 1.50 MIRU WHDBOP RURD P R/U testing equipment. Grease choke 08:00 0930 manifold. Fill stack with fresh water. 6/16/2019 6/16/2019 4.00 MIRU WHDBOP BOPE P Test BOP'S with 3 1/2" test joint T/ 09:30 13:30 250/3000 PSI for 5 Min each. Test PVT and gas alarms. Witness waived by AOGCC rep Brian Bixby. 019 6/16/2019 1.00 MIRU WHDBOP RURD P R/D testing equipment and B/D lines. 13:30 13:30 1430 6/16/2019 6/16/2019 0.50 MIRU WHDBOP MPSP TT --Pull test plug and IS -A BPV W/tlry 14:30 1500 rod. 6/16/2019 6/16/2019 0.50 COMPZN RPCOMP RURD P R/U tubing tongs, rig tongs and 15:00 1530 elevators to pull completion. MU landing joint into hanger. 6/16/2019 6/16/2019 2.00 COMPZI RPCOMP PULL P BOLDS - siezed up, pull 100K, broke 15:30 1730 1 screw, then PU wt 85K. Pull hanger to rig floor, disconnect control line from hanger. UD hanger, landing jt and PUP. 6/16/2019 6/16/2019 2.00 COMPZN RPCOMP CIRC P Circulate down tubing 3bpm 275psi 17:30 19:30 bottoms up. SD. Observe well for flow 10min, no flow. Pump dry job, RU to POOH. 6116/2019 6/17/2019 4.50 COMPZN RPCOMP PULL P POOH LD 3 1/2" EUE completion, 19:30 00:00 spooling control line. POOH to 3960'. Bleed OA pressure off to zero, no measurable fluid. 6/17/2019 6/17/2019 5.00 COMPZN RPCOMP PULL P POOH LD 3 112" tubing, jewelry and 00:00 05:00 cut joint. Strap and tally, process pipe in shed. Recovered all 34 control line bands, 5GLMs and one TRSSSV 207 joints of 3 112" and one cut joint Page 2/7 Report Printed: 7/8/2019 Operations Summary (with Timelog Depths) 1F-12 Rig: NABORS 7ES Job: RECOMPLETION Time Log Sten Time End Tima Dur hr ( ) Phase op Code Activi Code ry Time P- - T X Operation Stan Depth (ft DO End Depth (WB) 6/17/2019 6/17/2019 1.50 COMPZN RPCOMP RURD P Clean and clear floor. LD control line 05:00 06:30 spooler. R/D tubing tongs. Change elevators. Strap and tally drill collars. Verify BHA running order. 6/17/2019 611712019 0.50 COMPZN RPCOMP SFTY P PJSM W/ rig crew on picking up BHA 06:30 07:00 and DP. 6/17/2019 6/17/2019 0.50 COMPZN RPCOMP BHAH P M/U bull nose, 7" casing scraper, 0.0 203.0 07:00 07:30 1 magnet and drill collars. 6/17/2019 6/17/2019 7.00 COMPZN RPCOMP PULD P Single in hole with DP T/ 6196' UWT 203.0 6,196.0 07:30 14:30 142K, DWT 100K 6/17/2019 6/17/2019 0.50 COMPZN RPCOMP WASH P Wash @ 5bpm 930psi and scrape F/ 6,196.0 6,272.0 14:30 15:00 6196'T/ 6272' - tag 5K on 3 1/2" tubing stub. No abnormal drag with scraper. 6/17/2019 6/17/2019 1.50 COMPZN RPCOMP CIRC P Pump 25 Bbls 200+ VIS sweep. Circ 6,272.0 6,272.0 15:00 1630 out of hole. 6/17/2019 6/17/2019 0.50 COMPZN RPCOMP OWFF P Observe well for flow - No flow. Pump 6,272.0 6,272.0 16:30 17:00 20 Bbls 12.7 PPG dry job. B/D top drive. 6117/2019 6/17/2019 3.50 COMPZN RPCOMP TRIP P POOH F/ 6272'T/ 203' monitor well 6,272.0 203.0 17:00 20:30 1 1 15min. 6/17/2019 6/1712019 2.00 COMPZN RPCOMP BHAH P Stand back one stand collars. LD one 203.0 112.0 20:30 22:30 1 stand DC, scraper and magnet. PU Baker set tool and retrievable bridge plug on 1 stand collars. 6/17/2019 611812019 1.50 COMPZN RPCOMP TRIP P Trip in hole with RBP on 3 1/2" HT38 112.0 6,250.0 22:30 00:00 DP t/2500' running speed as per Baker. 6118/2019 6/18/2019 2.00 COMPZN RPCOMP TRIP P TIH with RBP V set depth +/-6250' 6,250.0 6,250.0 00:00 02:00 6/18/2019 6/1812019 1.50 COMPZN RPCOMP MPSP P Set RBP as per Baker, mid element 6,250.0 6,250.0 02:00 03:30 6246' RKB (bottom at 6251'). Close pipe rams, attempt to pressure test casing, pumped 4.5bbi 11.6ppg mud; at approx. 1600psi appeared to be injecting, SD and isolate surface lines, pressure bled off to 800psi. No response on OA. 6/18/2019 6/18/2019 4.50 COMPZN RPCOMP MPSP P Latch onto RBP, release, allow 6,250.0 6,028.0 03:30 08:00 element to relax. POOH approx. 30ft. Attempt to set RBP at 6216', slipped down hole, reset tool, pull up above. Set RBP, mid element 6210' RKB. Close pipe rams, test casing, 1800 PSI broke over Open up and release, pull up hole. Set RBP 6146' Close pipe rams, test rasing pressure broke over at 1900 PSI. Open up and release, pull up hole attempt to set RBP at 6091', slipped down hole. Pull up hole attempt to set RBP at 6060', slipped on down stroke again. Pull up hole attempt to set RBP at 6028', slipped on down stroke again. 6/18/2019 6/1812019 0.50 COMPZN RPCOMP CIRC P Circulate down drill pipe to attempt to 6,028.0 6,028.0 08:00 08:30 wash any possible debris away from slips on RBP. 3 BPM 520 PSI. 6/18/2019 6/18/2019 0.50 COMPZN RPCOMP MPSP PAttempt to set RBP at 5996' slips did 6,028.0 5,996.0 08:30 09:00 not set in down stroke. 6/18/2019 6/18/2019 0.50 COMPZN RPCOMP SVRG P Service rig, greasse drawworks, top 5,996.0 5,996.0 09:00 09:30 drive, and remove light from derrick. Page 317 Report Printed: 718/2019 . Operations Summary (with Timelog Depths) 1F-12 Rig: NABORS 7ES Job: RECOMPLETION Time Log Start Time End Tune our (hr) Phase Op Cade Activity Code Time P -T -X Operation Stan Depth (ftKB) End Depth (MB) 6/18/2019 6/18/2019 0.50 COMPZN RPCOMP OWFF P Observe well for flow - No flow. Pump 5,996.0 5,996.0 09:30 10:00 25 Bbls 12.8 PPP dry job. B/D Top -3 drive 6/18/2019 6/18/2019 00 COMPZN RPCOMP TRIP P POOH F/ 5996 T/ 112' 5,996.0 112.0 10:00 13:00 6/18/2019 6/18/2019 1.00 COMPZN RPCOMP BHAH P Rack back drill collar, UD G plug from 112.0 112.0 13:00 14:00 retrieval tool. P/U new G plug and M/U to retrieval tool. RIH with drill collars. 6/18/2019 6/18/2019 1.00 COMPZN RPCOMP TRIP P RIH F/ 112' T/ 1981' 112.0 1,981.0 14:00 15:00 6/18/2019 6/18/2019 0.50 COMPZN RPCOMP MPSP P Shallow hole test of RPB. Set RBP @ 1,981.0 1,981.0 15:00 15:30 1981', Gose UVBR pressure test T/ 1000 PSI - Good test. Open up and release RBP. 6/18/2019 6/18/2019 2.25 COMPZN RPCOMP TRIP P RIH F/ 1981'T/ 6250' 1,981.0 6,250.0 15:30 17:45 6/18/2019 6/18/2019 0.75 COMPZN RPCOMP MPSP P Set "G" -plug at 6240' top of plug. 6,250.0 6,250.0 17:45 18:30 Tested to 1000 psi for 10 minutes. 6/18/2019 6/18/2019 1.50 COMPZN RPCOMP CIRC P Circulated BU with 11.6# brine based 6,250.0 6,250.0 18:30 21 mud. Pumped 23 BBL dry job. 6/18/2019 6/18/2019 3.75 COMPZN RPCOMP TRIP P TOH with drill pipe from 6250' MD to 6,250.0 0.0 20:00 23:45 surface. LD BHA 6/18/2019 6/19/2019 0.25 COMPZN RPCOMP BHAH P7- MU 2nd RBP to running tool and 0.0 23:45 00:00 cellars, 6/19/2019 6/19/2019 0.25 COMPZN RPCOMP TRIP P7- Trip in hole top of RBP at 564' MD 0.0 564.0 00:00 00:15 '951 -9/2019 6/19/2019 0.25 COMPZN RPCOMP MPSP P Set RBP with 10K down 4 rot release 564.0 564.0 00:15 00:30 1 from RBP 6/19/2019 6/19/2019 0.25 COMPZN RPCOMP TRIP P TOH with DP 564.0 0.0 00:30 00:45 6/19/2019 6/19/2019 1.25 COMPZN RPCOMP MPSP P RU and test upper RBP to 2500 psi for 0.0 0.0 00:45 02:00 10 minutes. 6/19/2019 6/19/2019 0.25 COMPZN RPCOMP SFTY P PJSM to ND/NU BOPE and tubing 0.0 0.0 02:00 02:15 head. 6/19/2019 6/19/2019 -7 75 COMPZN RPCOMP VU -N-0- P ND BOPE and tubing head. Replace 0.0 0.0 02:15 10:00 secondary packoff in tubing head and NU Tbg head and BOPE. 6/19/2019 6/19/2019 0.50 COMPZN RPCOMP BOPE P FMC test packoff T/ 3000 PSI for 10 0.0 0.0 10:00 10:30 Min - Good Test Test break on top of tubing head against lest plug 250/3000 for 5 Min each - Good Test 6/19/2019 6/19/2019 0.50 COMPZN RPCOMP RURD P RID testing equipment 0.0 10:30 11:00 6/19/2019 6/19/2019 0.50 COMPZN RPCOMP RURD P Install wear bushing in tubing head. 0.0 0.0 11:00 11:30 '6/ -0 6/19/2019 19/20-19 50 COMPZN RPCOMP TRIP P R/U retrieval tool RIH T/ 560'. Close 0.0 564.0 11:30 12:00 annular strip down and engage RBP 564' 6/19/2019 6/19/2019 1.00 COMPZN RPCOMP CIRC P Circulate 3BPM 11.7#/gal BU through 564.0 564.0 12:00 13:00 poor boy tlegasser. 6119/2019 6/19/2019 0.50 COMPZN RPCOMP PULL P Release G -plug and blow down top 564.0 564.0 13:00 13:30 drive. 6/19/2019 6/19/2019 0.50 COMPZN RPCOMP TRIP P TOH from 564' and lay down G -plug. 564.0 0.0 13:30 14:00 6/19/2019 6/19/2019 3.50 COMPZN RPCOMP TRIP P TIH from surface to 6249' KB. 0.0 14:00 17:30 I up/wt=139k DNNVT=94K Page 417 Report Printed: 71812019 Operations Summary (with Timelog Depths) 1F-12 Rig: NABORS 7ES Job: RECOMPLETION Time Log Btatl Time End Tma Dur (hr) Phase Op Cotle Activity Code Time P -T -X Operation Start Depth (ftKB) End Depth(XKB) 6/19/2019 6/19/2019 1.00 COMPZN RPCOMP MPSP P Attempt to pressure test G -plug at 17:30 18:30 6249.4 top to 2000psi againts closed pipe rams. unable to maitain pressure. presure bled back to 950 psi. in 3 minutes. made second attempt with inside kill closed with same results. 6/19/2019 6/19/2019 3.50 COMPZN RPC 0 MMP CIRC P Open pipe rams close annular 18:30 22:00 preventer and line up to circulate through choke via gas buster. Circulate 2.5 btms up ICP=560 psi DP psi=35 psi. 11.1 MD WT 1st btms up returns gas cul. 11.4 MD WT 2nd btms up returns gas cut. DP FCP=550 Csg=37 psi. 3 BBL pit gain. 6/19/2019 6/19/2019 0.50 COMPZN RPCOMP OWFF P OWFF SICP=108 psi, transfer and 22:00 2230 isolate light mud from weighted mud 6/19/2019 6/20/2019 1.50 COMPZN RPCOMP CIRC P Circulate 2 btms up till wd wt=11.6# 22:30 0000 around DP ICP=650 psi. Csg =160 psi. FCP= 0 psi/0 psi. 6/20/2019 6/20/2019 0.25 COMPZN RPCOMP CIRC P Complete circulating RBP with through 00:00 00:15 11.6# SXS. 019 6/20/2019 0.50 COMPZN RPCOMP OWFF P OWFF for 30 minutes. 00:15 00:15 00:45 6/20/2019 6/20/2019 1.00 COMPZN RPCOMP MPSP P Release RBP, PU and verify plug is 00:45 01:45 released run back to 6250' 6/20/2019 6/20/2019 0.75 COMPZN RPCOMP CIRC P Circulate SXS through plug at 3BPM. 01:45 02:30 6/20/2019 6/20/2019 0.50 COMPZN RPCOMP OWFF P OWFF no flow 02:30 03:00 6/2012019 6/20/2019 0.75 COMPZN RPC 0 MMP MPSP P Set RBP at 6190' mid -element top at 03:00 03:45 6186' KB work torque to bridge plug and release from plug attempt to pressure test to 2000 psi. pressure fell off to 1600 psi in less than 1 minute. hold PJSM for plan forward to TOH. 6/20/2019 6/20/2019 3.25 COMPZN RPCOMP ALFT P POOH F/ 6190' T/ 104' 03:45 07:00 6/20/2019 6/20/2019 0.50 COMPZN RPC 0 MMP BHAH P P/U EA Retrievamatic packer and M/U 07:00 0730 G plug retrieval tool below it. 6/20/2019 6/20/2019 3.00 COMPZN RPC 0 MMP TRIP P RIH F/ 120'T/ 3033.6' Center of 120.0 3,033.0 07:30 1030 element on Retrievamatic. Set test packer. 6/20/2019 6/20/2019 1.00 COMPZN RPCOMP MPSP P R/U and test down DP F/ 3033.6'T/ 3,033.0 3,033.0 10:30 11:30 6186'- Fail- Broke over at 1770 PSI leveled out at 1000 PSI Pressure test IA F/ Surface T/ 3033.6 to 2000 PSI- Good test. R/D testing equipment. Release packer. 019 6/20/2019 1.75 COMPZN RPCOMP TRIP P RIH F/ 3033' T/ 5493.6" COE. Set test 5,493.0 5,493.0 11:30 11:30 13:15 packer 6/20/2019 6/20/2019 0.50 COMPZN RPCOMP MPSP P R/U and test IA F/ Sudace T/ 5493.6 5,493.0 5,493.0 13:15 13:45 to 2000 PSI - Good test. R/D testing equipment. Release packer. 6/20/2019 612012 119 0.25 COMPZN RPCOMP TRIP P RIH F/ 5493' T/ 5650' COE. Set test 5,493.0 5,650.0 13:45 14:00 packer. Page 5/7 Report Printed: 7/8/2019 Operations Summary (with Timelog Depths) 1F-12 Rig: NABORS 7ES Job: RECOMPLETION Time Log Stan Time End Time Dur (M1) Phase Op Code Activity Cade Time P-T-X Operation Start Depth (ft<B) End Depth (8K13) 6/20/2019 6/20/2019 0.50 COMPZN RPCOMP MPSP P R/U and test IA F/ Surface T/ 5650' to 5,650.0 5,650.0 14:00 14:30 2000 PSI - Good test. RID testing equipment. Release packer. 6/20/2019 6/20/2019 0.25 COMPZN RPCOMP TRIP P RIH F/ 5650'T/ 5750' COE. Set test 5,650.0 5,750.0 14:30 14:45 packer. 6/20/2019 6/20/2019 1.50 COMPZN RPCOMP MPSP P R/U and lest IA F/ Surface T/ 5750'. - 5,750.0 6,180.0 14:45 16:15 Fail. Broke over at 1800 PSI leveled out at 1000 PSI Pressure test down DP F/ 5750'T/ 6186'- Good test. R/D testing equipment. Release packer. 6/20/2019 620/2019 0.25 COMPZN RPCOMP TRIP P RIH F/ 5750' T/ 6180' End of pipe. 6,180.0 6,180.0 16:15 16:30 6120/2019 6/20/2019 3.50 COMPZN RPCOMP CIRC P Circulate hole STS conditioning mud. 6,180.0 6,180.0 16:30 20:00 6/20/2019 6/21/2019 4.00 COMPZN RPCOMP TRIP P TOH with DP from 6180' EOP 6,180.0 3,760.0 20:00 00:00 PU/WT=140 pump dry job and continue POOH 6121/2019 6/21/2019 2.75 COMPZN RPCOMP TRIP P Continue to TOOH to collars. 3,670.0 104.0 00:00 02:45 6/21/2019 6/21/2019 1.00 COMPZN RPCOMP BHAH P LD BHA/Clear floor 104.0 0.0 02:45 03:45 6/21/2019 6/2112019 1.25 COMPZN RPCOMP RURD P RU to run TBG. 0.0 0.0 03:45 05:00 6/21/2019 6/21/2019 0.25 COMPZN RPCOMP SFTV P PJSM for running TBG 0.0 0.0 05:00 05:15 6/21/2019 6/21/2019 12.25 COMPZN RPCOMP RCST P RIH with 3-1/2", 9.3#, L-80, EUE Mod 0.0 05:15 17:30 8rd Tbg. Filling pipe with fill up line every 15 joints. UWT 83K DWT 67K BW 35K Fully located on tubing stump at 6274' ORKB. P/U String weight. Bottom of Obershot at 6280.84' 621/2019 6/21/2019 0.50 COMPZN RPCOMP PACK P Pressure up down tubing to 2000 PSI, 17:30 18:00 SO 20K string weight, pressure up to 3000 PSI and hold for 10 Min. Setting Pop of packer G 5646.83'. 6/21/2019 6/21/2019 0.25 COMPZN RPCOMP PRTS P Bleed tubing to 2000 PSI. Test IA to 18:00 18:15 2000 PSI for 10 Min, Bleed IA to 0 psi 6/21/2019 621/2019 0.25 COMPZN RPCOMP HOSO P Shear out or PBR at 98K UpWt. space 18:15 18:30 out tubing. 6/21/2019 6/21/2019 1.25 COMPZN RPCOMP CIRC P Circulate 30 BBL 250cp Vis corrosion 18:30 19:45 inhibited spacer at 4 BPM. Chase with 260 bbls Cl seawater. 6/21/2019 6/21/2019 1.50 COMPZN RPCOMP HOSO P Laydown 3joints PU pupjoint 10.25 19:45 21:15 and 6.33' install under joint 195 run Jt 195. 6/21/2019 6/21/2019 0.25 COMPZN RPCOMP THGR P PU and MU Tbg Hgr. Land hanger 21:15 21:30 RILDS. 6/2112019 6/21/2019 0.25 COMPZN RPCOMP RURD P RU to test Tbg and casing 21:30 21:45 6/21/2019 6/21/2019 0.25 COMPZN RPCOMP PRTS P Pressure test tubing to 3000 psi for 10 21:45 22:00 minutes. Hold Pre tour meeting make crew C/O 6/21/2019 6/21/2019 1.25 COMPZN RPCOMP PRTS P Pressure test rasing to 2000 psi for 30 22:00 23:15 min. Bleed tubing to 0 psi. Shear SOV. Line up and pump down IA to tubing to establish communication. Page 617 Report Printed: 718/2019 Operations Summary (with Timelog Depths) 1F-12 Rig: NABORS 7ES Job: RECOMPLETION Time Log Stan Time End Time Dur(m) Phase Do Code Activity Code Time P -T-% Operahen Start Depth (ftKB) End Depth(ftKB) 6/21/2019 6/22/2019 0.75 COMPZN RPCOMP RURD P RD testing equipment, wash and drain 23:15 00:00 stack in prep for between well maintenance. 6/22/2019 6/22/2019 0.50 COMPZN RPCOMP RURD P Wash Stack with stack washer, Prep 00:00 00:30 for BWM. 6/22/2019 6/22/2019 0.50 COMPZN RPCOMP MPSP P Set BEV for ND and test from below to 00:30 01:00 1000 psi 6/22/2019 6/22/2019 3.00 COMPZN WHDBOP SVRG P Perform BWM while cleaning pits, 01:00 04:00 6/22/2019 6/22/2019 3.00 COMPZN WHDBOP NUND P ND BOPE and NU adapter and tree. 04:00 0700 6/22/2019 6/22/2019 1.00 COMPZN WHDBOP PRTS P R/U testing equipment. Fill tree with 07:00 08:00 diesel. Pressure test tree 250/5000 PSI for 5 Min each - Good test. R/D testing equipment. 6/22/2019 6/22/2019 2.50 COMPZN WHDBOP FRZP P PJSM W/ LRS and rig crew. Freeze 08:00 10:30 protect well with 80 Bbls of diesel. Suck 2 Bbls back. Place IA and tubing in communication and allow well to U- I ube. 6/22/2019 6/22/2019 COMPZN WHDBOP MPSP P PJSM W/ FMC and rig crew. Set H 10:30 11:00 TU,50 BPV R/D circulating equipment. Secure cellar. Rig released at 11:00 Page 717 Report Printed: 7/8/2019 THE STATE °fALASKA GOVERNOR MIKE DUNLEAVY John Peirce Sr. Wells Engineer ConocoPhillips Alaska, Inc. PO Box 100360 Anchorage, AK 99510 Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 1F-12 Permit to Drill Number: 183-136 Sundry Number: 319-326 Dear Mr. Peirce: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.00gcc.aloska.gov Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Daniel T. Seamount, Jr. Commissioner DATED this 1 d of July, 2019. RBDMS'4S/ JUL 10 2019 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 JUL 0 8 9019 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ n utdown❑ Revised 4 z Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: CEMENT SOZE121 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: ConocoPhilli s Alaska Inc. Exploratory El 17 , Stratigraphic [I Service 016. 183-136 3. Address: API Number: P. O. Box 100360, Anchorage, Alaska 99510 50029210120000 , 7. If perforating: 8. Well Name and Number: 7 What Regulation or Conservation Order governs well spacing in this pool? N/A KRU 1F-12 Will planned perforations require a spacing exception? Yes ❑ No O 9. Property Designation (Lease Number): 10. Field/Pool(s): ADL 25652 ' Kuparuk River Field / Kuparuk River Oil Pool It. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 6,840' 6,288' ' 6738 6194 3200psi NONE NONE Casing Length Size MD TVD Buret Collapse Conductor 76' 16" 108' 108' Surface 2,223' 95/8 2,254' 2,243' Production 6,788' 7" 6,819' 6,268' Perforation Depth MD (ft) JPerforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 6434-6470, 65684628 5917.5949, 6037.6093 3.500" L -80/J-55 6,558' Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): PACKER - PACKER HS PACKER MD = 5647 TVD= 5235 PACKER - CAMCO HRP -1 -SP PACKER MD= 6320 TVD= 5815 PACKER - BAKER FB -1 PACKER MD= 6537 TVD= 6010 SSSV -NONE N/A 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development[Z ' Service ❑ 14. Estimated Date for 7117/2019 15. Well Status after proposed work: Commencing Operations: OIL O WINJ ❑ WDSPL ❑ Suspended ❑ GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ 16. Verbal Approval: Date: Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: John Peirce Contact Name: John Peirce Authorized Title: Sr. Wells Engineer Contact Email: John.W.Peirce@cop.com ,r Contact Phone: (907) 2656471 - Authorized Signature: / 6✓ — Date: %/ 1. COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 31� - 3210 Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: Post Initial Injection MIT Req'd? Yes ❑ No W/ RBDMSLfA' JUL 10 2019 Spacing Exception Required? Yes ❑ No Subsequent Form Required APPROVED BY 7p // 7y Approved by: COMMISSIONER THE COMMISSION Date: ` G 7/7//7- vi 11t� 1 VTL �/9rov`� ®RJG4F� m 10-aU3Approved application a o [ s to of approval. Submit Form and Attachments in Duplicate Proposed 1 F-12 Post-RWO C Sand Selective Cement Squeeze Procedure 1 F-12 is a selective producer was drilled and completed in 1983 and perforated in Kuparuk C4, A5, and A4 sands. A 1 F-12 RWO was completed 6/22/19 which stacked a new Packer above a leaking Packer and a production casing leak that was found during the RWO —700' up hole of the leaky Packer. 1F-12 now has a 'poor boy' overshot over a cut tubing stub at 6274' RKB. 3.5", 9.3#, L-80 tubing was installed surface to 6280' RKB, and 1983 vintage 3.5", 9.3#, J-55 tubing remains at 6280 - 6557' RKB extending through the C Sd selective. The C sand selective has 3 open production mandrels at 6357' (CV), 6424' (CV w/broken latch), and 6495' RKB (CV). Post-RWO work 6/28 & 6/28/19 swapped an SOV at 5015' RKB to DV, then a DDT -IA passed. SL pulled a Plug from 5696' RKB, and RBP from 6347' RKB, and Plug from 6552' RKB. Next, the C Sand will be Cement squeezed before installing a new GILD to return 1 F-12 to production. Surface facility work needs to be completed before 1 F-12 can be BOL in —2 months, so timing is good to do the squeeze as soon as possible. Due to high C Sd WC% and a failed CV with a broken latch that can't be pulled in the selective at 6424' RKB, the C Sd selective will be cement squeezed to convert 1F-12 to 'A Sand only' production. A Veparate wor procedure will be installing the gas lift design after the C Sand Cement squeeze is completed. Procedure: Slickline: 1) Brush & Flush 6501 - 6530' RKB where a millable Plug will be set for C Sd Cement squeeze. DSL: 2) Set millable Plug at 6515' RKB at middle of a full joint. 3) Set Catcher Sub at —6515' RKB above millable Plug. 4) Pull HFCV at 6495' RKB. Leave pocket'open' for C Sd Cement squeeze. Leave CV at 6424' RKB (with broken latch) set 'as -is' for squeeze. 5) Pull HFCV at 6357' RKB. Leave pocket 'open' for C Sd Cement squeeze. 6) Pull Catcher Sub at 6515' RKB. Coil Tubing: 7) MIRU CTU. Perform work steps: a) Hold PJSM. Establish site control and erect signs. Inspect work site and mitigate hazards. Note wind direction and establish muster points. PT equipment as required. b) RIH with CT with Cementing Nozzle. Tag Plug at 6515' RKB and 'flag' pipe. PUH with nozzle to 6415' RKB (100' above Plug), then circulate down CT to load well with Freshwater. c) Pump an injectivity test at 0.5 bpm, 1.0 bpm, and 1.5 bpm to C Sd. Record CT pressure, CT backside pressure, and choke pressure data at each flatlined rate. d) If injection test verifies ability to pump Cement to C Sd for squeeze, mix 27.3 bbls of 'pumpable' 15.8 Cl G Cement, while circulating another —100 bbls Freshwater. e) Pump 27.3 bbls Cement down CT to target squeezing —20 bbls of Cement to C sand perfs at 6434 - 6470' RKB through the open GLM pockets, and leave —7 bbls of Cement Plug in tubing and Tbg x Csg annulus across C sand selective. Squeeze cement to C Sand to target WHP of 1500 psi. f) Pump 5 bbls Freshwater Spacer behind Cement, followed by cement contaminant for jetting cement cleanout. g) RIH to jet out excess cement down to 6300' RKB max depth, and intentionally leave cement below 6300' RKB to leave Cement Plug across the C sand selective. h) Jet out contaminated cement from tubing and leave upper 2000' TVD of Tubing FP with 17.5 bbls Diesel. i) RD CTU. WOC 48 hrs. DHD: 8) Perform a baseline injection test for LLR by pumping Diesel to maximum of 1500 psi down tubing to determine if C Sd Cement Sqz appears to be holding or not. Coil Tubing: 9) MIRU CTU. RIH with Motor & Milling BHA. Mill Cement stringers and Cement Plug from tubing to 6505' RKB to —10' above the bottom Plug, then halt milling to perform a Post-Sqz C Sd injection test pumping Diesel FP down CT to 1500 psi max WHP. Compare test results from step 8 against new LLR results to determine if LLR's are the same or does LLR indicate need for a C Sand resqueeze. a) If LLR results indicate a leaky C sand squeeze, delay execution of remaining steps in this this procedure to leave the bottom Plug at 6515' RKB in place for another C sand squeeze, by repeating step 7 above. b) If LLR results show a good C Sd squeeze, proceed to step 10 to mill up the bottom Plug. Continue to step 10 or POOH with CT leaving Tubing Diesel FP (17.5 bbls) and RD CTU. Coil Tubing: 10) RIH with Motor & Milling BHA. Mill out the Plug from the tubing at 6515' RKB. POOH with BHA leaving 17.5 bbls of Diesel FP in tubing. RD CTU & MOL. Contact Prod Engr to progress gas lift design installation job to enable 1F-12 for return production. 2 KUP PROD WELLNAME 1F-12 WELLBORE 1F-12 / Well Attributes Max Angle & MD TD COIIOCOPFI(��)p5 Neme YeeIIM,eAPWW Wallporesommi el(°) MD Fort) AE rimemNB) Alaska, Inc. KUPARUK RIVER UNIT 5002921012M PROD R17 440000 684nn 'ealliMill ISSSV'NONE 1113, TR .10'. 31'1]AM Last Tag Valva' e[t/nlato amid AnnoYNon peproods) End Dale WNIMR Laat Mod By coxoumoR; 32 0 -ma aUflFALE: 90.S2a40� G=&uW: z.ATs GAl asses paSUFT:5.DI67 EPATIR's0i GEALASTY. EWS POL 5 ski PACKER; Enter9 NIPPLE: 3.63 WER6NOi; e,Zla9 sreeLoo1 PACKER LEAK 6JID.0 PACKER: BJ2..1 IPERF:84h06,4160 BIAST RING:6,1]0.5 pss uFr'. s.ee6z mCATOR'.6.5>le SEAL ASSY, a5al4 SROE: do"i PACKER: 6M.4 MILL postal xIPPleassz.z sos', Eaton TERI:ILMIIPET8.0- PERF;6589.OQaDO PERF,L.Oe,a li� PRODUCTION, aabtra1S0 "Wi arep LaM Tag: RKB(CF= 17) 6.619.0 128/2018 1F-12 Ipproved Last Rev Reason Annotate, End Daie wenlorefoal Mad By Rev Reason CHEMICAL CUT TBG &1412019 1F-12 icondilw Casing Strings c.alne Daaatplbn 100 (In) IDlin6) mpddese sM Depte Inns) 8080to mO)... WBlie ll_.Grede Top Tk,ead CONDUCTOR 16 150fi 320 1080 1080 6300 H40 WELDED Casi,q Promotion OOlin) IOlinl Top lflllBl SN DepN IXMD set robin mpl... W1IL¢n (1.. Grade Top Tnreed SURFACE 9518 8.83 30.9 2,254.0 2,243.3 40.00 J-55 BTC Cast, wunpeon I ca, (In, In. pq Toprou.) and..oil 0KES I sal Depth Doid .. 9._G,ade ToprINdoes PRODUCTION ] 628 30.9 6,819.0 6268.8 26.00 J-55 BTC Tubing Strings Top lkNBl Sel Depth de, I., real, INDI L -Jed( I .mme TOP Connection Tubing peacription 5'inp Me... JS 121' 3112'RW02019 31/2 2.99 213 6,2808 5,])9] 930 L80 EUE Completion Details Top mo) ropmd Nominal Tappos) Intl 19 nem ae Com ID om 213 2].3 0.11 HANGER FMC 3112"Tubing Hanger w/pup 3-112'SHE land the 2.992 5,62].5 5218.5 33.32 SEAL ABBY Bakerl0'Seal AssemMy80 0SNboE Out2'Oa Nog. 3.000 5,6298 5.220.5 M30 PBA Baker PBR 8040 4.OW 5646 8 5.234.7 33.17 PACKER Baker ]" x 312ITS Packer 2.950 5,6963 5,2762 32.80 NIPPLE RES 3 IZx 221Y" x nipple Profile Wu481 positive pug 2813 Installed (SN 2662-9) 6.2]3.3 5773.1 27.47 OVERSHOT Baker x -Pooboy vers6ol ,B4'ofsw8hrFULLY 3,630 LOCATED Tubing Leandro on s1.Ins Ma., TUBING LEFT IN 312 OLE IDdn1 2.99 Top(IIIfB) 6.2800 Set person To 6,53]4 set DepM INDI I._yR(am) 6,010.1 930 oade J-55 Top L'-ra bn EUE8r0 Completion Details Tors mol tors mEl Nominal TopotKD) rusid C lam, Dee Co. in (in) 6,297.1 5,794.2 27.14 SBR CAMCO OEJ SBR 2.93> 6,320.1 5,8147 2689 PACKER CAMCO HRP -1 -SP PACKER 2867 6,430.5 5,913.6 2587 BLAST RING OUADRASEAL BEAST RINGS (2) 2.86] 6,530.8 6,004.2 25.02 LOCATOR BAKER LOCATOR SUB 2SW 6,5314 6,004.] 2501 SEALASSY BAKER SEAL ASSEMBLY 3.000 6,5369 60.09] 24.94 SHOE BAKER MULE SHOE GUIDE 2.992 Tuq Oeiml Mon SVIn Ma.. ID int To n8 p 9 ( ppkKdb sd Dersm n.. set Depth mD l --wt Aunt Grade Top LonnaWn PACKER ASSY 3112 299 6,5324 6,5586 6029.4 930 J-55 EUE8rd Completion Details Tap modTep Mel NominaI Topp ) sedd 1.1 nem Deo Cpn IpgM 6,53].4,010.1 24.93 PACKER BAKER FB -1 PA KER 1000 8,510.0 ,012.5 24.90 MILL BAKER MILL CUT EXTENSION 2.992 6,552.2 8,023.6 I Is to NIPPLE CAMCO D NIPPLE 2750 6,5577 60266 I 24.66 SOS BA ERS EAR OUT SU ELMD TL 54 d;dmg PPROF on 3.000 510112008 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top (N(B) Top VD) /T (WB) Tap Incl I°I Deo Core Run Dale Ip9n) 6,3 5,8146 26.89 1 PACKER LEAK I USPECTMIFITCEM77MR1711PACKER,1/412TIEpensLIFT;rtabli PUMPED 1 BPM AT 2400 PSI THRU OPEN POCKET TO FORMATION, BASED ON LDL PERFORMED 1142019 6424.1 5,9079 2592 GLM LEAK Leakin lLM1141236028422FISHOT TRAY LOST KOT TRAY IN RAT HOLE 712 Perforations & Slots Shot pMa Top mD) Bgl(TVD) Iavedalk Top oboe Ban ME) INtB) Been LMMil.. Doh I Typo Cmm 8,434.0 6,470.0 5,9168 5,949.2 4,UNITBLIF 102)11983 120 IPERF DA 5'eng guns 12 6,588.0 8,96.0 6,037.9 6,045.2 A-5, 1F-12 124I198d 40 /PERF DA 2118 BarKone 11 6,588.0 66280 6,0561 6.092.7 A4, 1F-12 1124119M 40 IPERF OA 2116 Bartame 11 6,588 0 66280 6,0561 6,092.7 JA4. 1F-12 islunb84 20 IPERF 121116 Link Cone Mandrel Inserts Sf an H Top(TVvalve D1 Udelb rental. TRO . Top ME) (mr., Make Madel Do (in) Sed", Topa Time (in) (Pea, Run Date Com 1 2,5016 24954 Cameo MMG 1112 GAS LIFT MY RK 61212019 2 3,8685 3,7947 Cameo MMG 112 GAS LIFT DMY RK 61212019 3 5,0168 4]22.1 Cameo MMG 112 GAS LIFT DV RK 61272019 4 5,602.2 5,197.4 78nvo MMG 112 GAS LIFT DRAY RK 612112019 5 6,357,2 5,847.9 rare. MUG 1 PROD HFCV BEK 0.000 0.0 24/2018 6 6,424.1 5,90].9 Camc. FIR 1 PROD CV Broke 8000 00 1/12/2009 7 6495.2 5,971.9 Camc. KBUG 1 PROD HFCV BEK Ono 0.0 2312018 Notes: General & Safety End Done Annoreion fi12712.1 NOTE. Vier Schematic w/Alaska SCM1ematic100 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 RECEIVED MAY 3 1 2019 AOGCC 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ tions shutdown❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ dChpp ved Program[]Plug for Redrill ElPerforate New Pool ElRe-enter Susp Well ElAlterCasing ElCEMENT SQZEQ- 2. Operator Name: 4. Current Well Class: 5. Permit to N er ConocoPhilli s Alaska Inc. Exploratory ❑ Development ❑ Stratigraphic ❑ Service ❑ 183-136 r 3. Address: 6. API r: P. O. Box 100360, Anchorage, Alaska 99510 1500292101200 ' 7. If perforating: 8 Wel and Number: What Regulation or Conservation Order governs well spacing in this pool? N/A Will planned perforations require a spacing exception? Yes ❑ No El KRU 1F-12 9. Property Designation (Lease Number): 10. Field/Pool(s): ADL 25652 Kuparuk Rive ' uparuk River Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (Plugs %00psi (MD): Junk (MD): 6,640' 6,268' 6738 6194 6350 NONE Casing Length Size MD TVD Burst Collapse Conductor 76' 16" 108' 108' Surface 2,223' 95/8 2,2 2,243' Production 6,788' 7" 6,819' 6,266' Perforation Depth MD (ft) jPerforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 6434-6470, 6568-6628 5917-6949, 6037-6093 ,0" J-55 6,558' Packers and SSSV Type:' PackersSSSV MD (ft) and TVD (ft): PACKER - CAMCO HRP -1 -SP PACKER MD= = 15 PACKER - BAKER FB -1 PACKER - 37 TV D= 010 SAFETY VLV - CAMCO TRDP-1A SAFETY VALVE D= 1 0 TV 1831 12. Attachments: Proposal Summary Q Wellbor 1 I WZIIICI after proposed work: Detailed Operations Program El Sketch ploratory ElStratigmphic ElDevelopmentQ Service E] 14. Estimated Date for 6/ 01 5. Well Status after proposed work: Commencing Operations: OIL Q WINJ ❑ WDSPL ❑ Suspended ❑ GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ 16. Verbal Approval: Date Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is true and a procedure approved herein will not be deviated from without prior written approval. Authorized Name: John Peirce John Peirce Contact Name: Authorized Tide: Sr. Wells Engineer Contact Email: John.W.Pairce@cop.com Contact Phone: (907) 265-6471 Authorized Signature: �30 - Date: COMMISSION USE ONLY Conditions of approv/NotifyCommisn so that a representative may witness Sundry Number: �-7 Plug Integrity ❑st ❑ Mechanical Integrity Test ❑ Location Clearance ❑-LI- OtherPost Initial Injection No—/Spacing Exception R❑ No & Subsequent Form Required: APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: R 1OG • /,,,,� Submit Form and Form 10-903 Revised 4/2017 Approved application i5 V8 0 1 S r m III"'Bitttt ��� f approval. �` Attachments in Duplicate I KUP PROD WELLNAME 1F-12 WELLBORE 1F-12 ���M/�� pI'a Well Attributes Max Angle flMD TD ' "-(��(t-5 FnN Name WellGore APYUWI WeIIWre Stilus ncl l°) MO fli Am Him (I Aldskd. Inc KUPARUK RIVER UNIT 500292101200 PROD 8.1J 4400.00 68400 1F-f25IWdt19 a A: 42 AM Last Tag Vwti:A ndminnc Tacna) AnnoWbn DepIM1 IXRBI End Date WNlaxe Last Mao By Last Tag RKB(CF= 1T) 6.6180 12&2018 1F-12 ppmven ......._....___............... _____. ........ Last Rev Reason w.NGER: 9.3� Amin. End Date WellsoreLasI MW By Rev Reason. ridded AVA Cather SI112019 1F-12 iSn'.1, Casing Strings I csmo 0eacri;Dn OD(in) ID (in) topmi set Dean Vii Bet oepM �V01...WtlLen ll._Gnee Top mrcae CONDUCTOR 16 15.06 32.0 106.0 108.0 6300 H40 lVi Casim9 DescriptionOD lin( IDllnl Top It MB) ssommf(mi set MpNIND)... WYLen (I Tap TM1reeG 0SI James SURFACE 8.83 30.9 2,256.0 2.243.3 40.00 JSS BTC CONDUCTOR: W Aide I I Desoriptien Cohn ID lin) op HKID sM Drotn ItM81 Set DePB11ND)... WIILm(I .'a.Topr mad PRODUCTION ] 628 309 6819.0 6,268.8 26.00 JSS BTC 1 .E,,Y'.mE Tubing Strings Tuning Description mind Mn... ID (p Top (tine) gel OepN m- set oemh(Tion 1... WY 1'.) Grade Tup Connection TUBINC 31,2 2.99 27.3 6,53]4 6,D10.1 9.30 J-55 EUEBrd onsuFrl I'a a Completion Details Top CVDI Top lnm Nominal Tap mKB) (mall P) don Des cam IO OnI 27.0 27.3 0.11 HANGER FMC TUBING HANGER 3.50 1,8398 1,8316 TM SAFETYVLV CAMCO TRDP-tA FETY VALVE-NON-EOUALI NG 2.813 (DAMAGED) LOCKED OUT 12/102007 SURFACEI mc2aca- 6,297.1 5,]94.2 27.14 SBR CAMCO OEJ SBR 293] 6320.1 5,8143 26.89 PACKER CAMCO HRP-1-SPPACKER 2867 GAS uFT'. S3e23 6430.4 5,913.5 2588 BLAST RING OUADRASEAL BLAST RINGS (2) 286] 6,530.8 6,004.2 2502 LOCATOR BAKER LOCATOR SUB 2992 GAS UFT. asst_e 6,531.4 6,004] 25.01 SEALASSY BAKER SEAL ASSEMBLY 3000 6,536.9 0 J 24.84 SHOE BAKER MULE SHOE GUIDE 2.992 GAa LITT;;856] iudrp Description SitlnB Me..10 In Top0M81 SII Dinam N.�9ei Dean (Tion I. W[IINIp G2de TOPConnMbn PACKERASSY 3112 2.99 65374 6.558.6 6,0294 930 1-55 EUEBrd Completion Details WBUFT:ESS 4 no (TV.) Top Incl Nominal Top III mne) I-) 1bm Des Com mon) 65374 6010.1 24.93 PACKER BAKER FB -1 PACKER 3000 6,540.0 6,012.5 24M MILL BAKER MILL OUT EXTENSION 2.992 aeR:4m].t 6,552.2 6,023.6 24.74 D - NIPPLE CAMCO D NIPPLE 2350 6,5577 6,028.6 246fi SOS BAKER HEAR OUT SUB, LM TTL @6543' during PPROF an 3.000 PDssm..1. ir_A1c 5MI12008 SMS Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Wo....." ToanVm) TOP In I life ) Inrie) 11 Des cram Run Date 10 fn) 63200 5,814.6 2689 P IBLE SUSPECT CASING LEAK AT OR NEAR PACKER, 1/42019 6.280 CASING LEAK PUMPED 1 BPM AT 2400 PSI THRU OPEN POCKET PwG(I.Sid TO FORMATION, BASED ON LDL PERFORMED 1/42019 PRODUCTION: O.W ii 83500 5,8610 26.59 PLUG WEATHERFORD 3-1/1 STD WRP(CPSTD3506), 2]8' OD X 3.85' OAL 115MOl 8 0.000 6,8380 62864 22.5] FISH NOT TRAY LOST NOT TRAY IN RAT HOLE 71201998 PRODUCTDRO.,12i Perforations 6 Slots Sam Dane Top(TVIN SmrnVDl Hamonat IPEPF;60.14.09,4]6.0� Tol,lnne) Bmlmne) MKB) mon Unseal Deas 1 Type cam 6,434.0 6,4]00 5,9168 5.1)11 Od, UNIT B, IF 1012]/1983 120 IPERF CA5"cs9gun5 -12 6568.0 6,5]6.0 6037.9 6,045.2 A5, 1F-12 1124/1984 40 IPERF DA 2118 Ba1KOne 11 6,588.0 6,628.0 6,058.1 6,092) Ad, 1F-12 1I24I1986 40 IPERF DA 21/69SIKOne II PRODUCTION: III 2-j 6.5880 6,628.0 6,08.1 6,092]A-0, iF-1 612911984 20 WERE 21116 Link Cone Mandrel Inserts LCCPTOR:Bma.3 BI an SEALASSY;6,m10 H Tap (NDI Vid" lain PpRBke TRO Run Top NINE( NINE) i Motlel mi S- Typ Time fin) (Psi) Run Dab Cam SnOE: sesi 1,909.8 1,900.9 Camco KBUG 1 GAS LIFT GLV BK 0.156 1,2900 421/2016 li C.S:Enai 2 3,3623 3,3565 Camco KBUG 1 GAS LIFT GLV BK 0.156 1,276 0 401/2016 3 4,551.6 4,3516 Camco KBUG 1 GAS LIFT GLV BK 0.188 1310.0 40121 Mu:6.5W.t d 5,6597 5,245.5 Camco KBUG 1 GAS LIFT OV BK 0.188 00 b122019 5 6,258.4 5,759.9 Camco KBUG 1 GAS LIFT DMY BK 0.000 00 2A1 2019 6 6,3572 5,847.9 Camw I 1 PROD HFCV BEK 0.000 0.0 b412018 D - NIPPLE: 8452.2 ] 6,4241 5,9079 Camco KBUG 1 PROD CV Broke 0000 0.0 1/12/2009 8 6.4952 5,971.9 Camco KBUG 1 PROD HFCV BEK 0000 0.0 21312018 Notes: General & Safety End Date i Annmztiun 9/1312010 NOTE View Schematic w/ Alaska Sommaiic90 565:Ossr] 1PERF.Sams6s,"i IPERF', 6.ms.06.Gi IP ERF', B.SmO8,8°A.O� FROOUCTION', 30.88,8196 FISH: Sam 0� Proposed 1F-12 Pre-RWO C Sand Selective Cement Squeeze Procedure 1F-12 selective producer is perforated in Kuparuk C4, A5, and A4 sands. 1F-12 was completed in 1983 with 3.5", 9.3#, J-55 tubing from surface to tubing tail at 6537' RKB. The C4 selective has 3 production mandrels at 6357' (HFCV), 6424' (CV w/broken latch), and 6495' RKB (HFCV). A WRP is currently set at 6350' RKB with Junk Catcher above it at 6347' RKB. 1F-12 is SI due to failed MITT & CMIT Tbg x IA. An MITT on 2/12/19 above the WRP failed (LLR = 0.19 bpm at 2500 psi) after replacing an OV with failed check at 6528' RKB. An earlier 1/4/19 LDL showed a leak possibly exists at the packer at 6320' RKB per temperature inflections noted logging there. Per 4/27/19 & 4/30/19 CMIT T x IA failures (LLR = 0.32 - 0.58 gpm range at 2500 psi), it's likely that a packer leak or a casing leak exists. An ultrasonic logging procedure is pending to better determine where the leaks are in 1 F-12. i�- wtiy � -+ wet t--FvTV�Sc,4C30t37 Due to high C Sd WC% and a failed CV with broken latch that can't be pulled in the selective at 6424' RKB, it is proposed that the C Sd selective be cement squeezed before performing a July 2019 RWO to re air a 'presumed' packer leak with a stacker packer. The cement squeeze is requested ASAP to verity if a stacker packer RWO will still be needed after the cement squeeze. A successful squeeze of C sand may halt communication between C Sd and IA if a Packer leak exists. The squeeze will also convert -12 to 'A san only production. 'Atubing patch option to isolate the C sand was considered, but a C Sd squeeze is preferred because it could also eliminate communication between C Sd and a Packer leak that may to be present and avoid introducing new Min ID restrictions to the well. Procedure: Slickline or Digital Slickline 1) Pull the Junk Catcher at 6347' RKB. 2) Pull the WRP at 6350' RKB. 3) Brush & Flush the 6327 - 6357' RKB area for a millable Cement Retainer set, and B&F the 6501 - 6530' RKB area for a millable CIBP set for a C Sd Cement Sqz. Digital Slickline or Eline 4) RIH with a 2.75" OD millable CIBP and set it at 6515' RKB. Slickline or Digital Slickline 5) Set a Catcher Sub at 6515' RKB above the CIBP. 6) Pull the HFCV at 6495' RKB from GLM #8. Leave pocket 'open' for C Sd Cement squeeze. We leave the CV at 6424' RKB (with broken latch) set as -is in GLM #7 for the squeeze. 7) Pull the HFCV at 6357' RKB from GLM #6. Leave pocket 'open' for C Sd Cement squeeze. 8) Pull the Catcher Sub at 6515' RKB. Coil Tubing 9) MIRU CTU. RIH with CT to tag CIBP at 6515' RKB and 'flag' pipe. POOH with CT leaving tubing liquid packed to surface by circulating in some Diesel, if needed. PU & RIH with millable Cement Retainer and reference 'flag' on CT for depth control to set the Retainer at 6342' RKB. Pump a short Diesel SRIT (0.5, 1.0, 1.5 bpm rates) through Cement Retainer to open C sand formation to verify good injectivity thru Retainer, and to verify that no returns are seen from CT x Tbg annulus to return tanks to indicate good Retainer set integrity. Mix 27.3 bbis (pumpable volume) of 15.8 ppg Cl G Cement. When cement is ready to pump, execute the pump schedule below. We maybe fracturing C Sd due to high Pnyd while CT is full of 15.8 ppg cement for a brief period from surface to C Sd, but fracing will abate as Pnyd drops below Frac pressure while pumping the tail of the cement job from CT. Pump C Sand Cement Squeeze down CT: a) 1 CT volume (-50 bbls) Freshwater at 0.5 bpm to displace Diesel from CT to C Sd, then b) 27.3 bbis of 15.8 ppg Cl G Cement at 0.5 bpm (or chase cement with higher rate only as long as needed to keep CT at a fairly constant positive circ pressure). Follow cement stage with, c) 5 bbis Tail Freshwater Spacer at 0.5 bpm, if possible, or chase cement at higher rate only as long as needed to try to keep CT at fairly constant circ pressure, before working back down toward 0.5 bpm. Follow this stage with, d) XX bbls of Biozan Cement Contaminant (where XX is appropriate volume to contaminate 1 bbl of Cement that will be left above Cement Retainer), followed by e) XX bbis Diesel Displacement at 0.5 bpm, if possible, (where XX = Diesel volume needed to complete displacement for remaining job duration). f) After 26.3 bbls Cement has passed through the Cement Retainer, PU CT to disconnect from the Retainer to prevent over -displacing the cement job to the C Sd Selective. g) Spot the last 1 bbl of Cement on top of the Retainer while POOH with CT, followed by h) RBIH with CT jetting 5 bbls Tail Freshwater spacer and Cement Contaminant down through 1 bbl of Cement above Retainer while taking returns from CT x Tbg annulus and IA to tanks, followed by i) POOH with CT while replacing voidage with Diesel to surface, then j) SI CT x Tbg & IA. Record final Tbg, IA, and OA pressures. k) RD CTU & Cement Van. MOL. 1) WOC at least 48 hours before performing additional work steps (below). DHD: 10) Perform CMIT Tbg x IA, and Tbg x IA DDT to determine if there is any indication of the 'suspect' Packer leak that may have caused Ann Comm from the C Selective to IA that resulted in failed 4/29/19 CMIT Tbg x IA. The C Sd cement squeeze may have cured this issue. Also perform 'baseline' MITT to 2500 psi to determine LLR (if MITT still fails) before performing mill out the Cement Retainer and Cement Plug from C Sd selective (per step 11). We can compare post-millout MITT to 2500 psi (per step 11 below) with `baseline' MITT to help make initial determination regarding if C Sd Cement Sqz appears to be holding or not. Coil Tubing: 11) MIRU CTU. RIH with Motor & Milling BHA. Mill out any cement stringers in tubing and Cement Retainer at 6342' RKB, then continue milling cement from tubing down to 6505' RKB (-10' above CIBP), then halt milling for DHD to perform post-Sqz MIT's (per step 12). POOH with BHA. RD CTU. 12) Perform CMIT Tbg x IA, and Tbg x IA DDT, and MITT to 2500 psi to duplicate same MIT parameters as performed in step 10 (above). Compare test results from step 10 (above) against new MIT results to determine if they are essentially the same, or do we have indication of LLR suggesting that the C sand may need to be re -squeezed or patched in the C Sd selective. If there is a slow LLR, but the MIT results are still the same as the step 10 results, then that may indicate that the C sand squeeze is good, but we may still have an Ann Comm tubing leak, and Packer leak or casing leak for a planned RWO to repair. Decide if cement milling should continue, or do we halt milling to perform resqueeze procedure. a) If MITT results indicate a leaky C sand squeeze, we will terminate execution of the remaining steps in this this procedure to leave the remaining Cement Plug and sand plug in place for a re -squeeze (or LDL then resqueeze). b) If we MITT results look good and we continue work per this procedure, then CT milling work will resume on 1 F-12 per step 13 (below) to remove remaining cement down to the Plug at 6515' RKB. Coil Tubing: 13) Verify a decision was made per step 12 before milling cement in 1 F-12. Also verify if 1F-12 RWO Engr prefers to keep a Plug set for upcoming RWO, or should we remove it. If we decide to remove the CIBP: MIRU CTU. RIH with Motor & Milling BHA and mill out the Plug from the tubing at 6515' RKB. POOH with BHA. RD CTU & MOL. Loepp, Victoria T (CED) From: Peirce, John W <John.W.Peirce@conocophillips.com> Sent: Thursday, June 13, 2019 12:46 PM To: Loepp, Victoria T (CED) Subject: Request to Cancel 10-403 Application Sundry for KRU 1 F-12 Victoria, I request cancellation of the 10-403 Application Sundry for KRU 1F-12 (PTD 183-136, Sundry 319-277) for a C Sand Cement Squeeze. I will resubmit a 10-403 in the future if a C Sand Cement Squeeze is still needed after the pending 1F- 12 Rig Workover. Thanks, John Peirce Sr Wells Engr CPAI Drilling & Wells (907)-265-6471 office Loepp, Victoria T (CED) From: Loepp, Victoria T (CED) Sent: Thursday, June 13, 2019 10:39 AM To: Peirce, John W Subject: RE: [EXTERNAL]KRU 1 F-12(PTD 183-136, Sundry 319-277) Cement Packer Squeeze John, Please send an email request to withdraw the sundry for KRU 1F-12(PTD 183-136, Sundry 319-277). Please submit a new sundry in the future if a C Sd squeeze to shut off the C Sd selective. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria. Loeoo(Eba laska. cov CONFIDENDALRY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)7931247 or victoria.[ oeaa@alaskaaaov From: Peirce, John W <John.W.Pei rce@co nocophillips.com> Sent: Tuesday, June 11, 2019 2:29 PM To: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Subject: RE: [EXTERNAL]KRU 1F-12(PTD 183-136, Sundry 319-277) Cement Packer Squeeze Hi Victoria, The 6-9-19 Ultrasonic Log on 1F-12 showed a signature leak exists at the Packer at 6320' RKB, but we don't know for sure if the leak is due to a tubing leak near the Packer, or if it is due to a Packer leak. However we are assuming the leak is a Packer leak. I just learned today that on Friday there was a change made in our RWO schedule, that resulted in moving 1F-12 RWO upon the schedule. I am not 100% sure why the change was made, but it means that the C Sand Sqz proposed via the 10-403 that I sent over is not going to be performed pre-RWO. The current plan is that the RWO will start in about one week on 1F-12. Thus, the C Sand Cement Squeeze must be done post -Rig. I'm told that 1F-12 RWO scope will include installation of a Stacker Packer to address a Packer leak. Due to change in the RWO timing, it may be best if I cancel my request for the 1F-12 C Sand Squeeze 10-403 approval. In the future when we do 1F-12 C sand Squeeze, the objective will be squeeze off C sand selective to convert 1F-12 to an A sand only producer. The current post-RWO plan forward for 1F-12 is to put the well on production and see how it performs. We expect that we will still want to do a C Sand Squeeze but perhaps you would prefer that I resubmit an updated 10-403 to perform the C Sand Squeeze at a later date after it is confirmed that we want to still do a squeeze. Let me know if it would best for you to receive an updated 30-403 request in the future or would you prefer to approve the 1F-12 10-403 that I just submitted for the 1F-12 C Sand Squeeze. I'm fine with whatever works best for you. Thanks, John Peirce Sr Wells Engr CPAI Drilling & Wells (907)-265-6471 office From: Loepp, Victoria T (CED) <victona.loepp@alaska.gov> Sent: Wednesday, June 5, 2019 1:40 PM To: Peirce, John W <John.W.Peirce@conocophillips.com> Subject: [EXTERNAL]KRU 1F-12(PTD 183-136, Sundry 319-277) Cement Packer Squeeze John, When will the ultrasonic logging to determine where the leaks are in this well be conducted? The results of these diagnostics will be required before we consider approving a C sand packer cement squeeze. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria. Loeoo(a)alaskaeov CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria. LoeppCa-alaskaaov THE STATE °fALASKA GOVERNOR MIKE DUNLEAVY James Hayes Sr. Wells Engineer ConocoPhillips Alaska, Inc. PO Box 100360 Anchorage, AK 99510 Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 1F-12 Permit to Drill Number: 183-136 Sundry Number: 319-220 Dear Mr. Hayes: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.00gcc.olosko.gov Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Daniel T. Seamount, Jr. Commissioner DATED this Z day of May, 2019. RBDMSRE6" MAY 0 2 2019 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 RECEIVED APR 3 0 2019 ®GCC 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑✓ Operations shutdown❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing 0 • Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: ❑ 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Con000Phillips Alaska, Inc. Exploratory ❑ Development Ell Stratigraphic El Service ❑ 183-136 ' 3. Address: 6. API Number: P.O. Box 100360, Anchorage, Alaska 99510 50-029-21012-00- 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? N/A _ KRU 1F-12 Will planned perforations require a spacing exception? Yes ❑ No ❑� 9. Property Designation (Lease Number): 10. Field/Pool(s): ADL 0025652 Kuparuk River Field / Kuparuk River Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 6,840' • 6,288' • 6,738' 6,194' 2,645 6,350' WA Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 16" 108' 108' Surface 2,223' 9-5/8" 2,254' 2,243' Production 6,790' 7" 6,819' 6,268' Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 6,343' -6,470'C -Sand 5,917'-5,949' C -Sand 3-1/2" J-55 6,553' 6,568' -6,628'A -Sand 6,037' -6,093'A -Sand Packers and SSSV Type: Baker FB -1 Packer Packers and SSSV MD (ft) and TVD (ft): Baker FB -1- 6,547' MD / 6,019' TVD Camco HRP-1sp Packer Camoo HRP-1sp- 6,320' MD / 5,814' TVD Camoo TRP -1A SSSV Camoo TRP -1A- 1,830' MD / 1,822' TVD 12. Attachments: Proposal Summary r Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch Q Exploratory ❑ Stratigraphic ❑ Development g - Service ❑ 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 7/5/2019 OIL Q WINJ ❑ WDSPL ❑ Suspended F-1 GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ 16. Verbal Approval: Date: Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: James Hayes Contact Name: James Hayes Authorized Title: Sr. Wells Engineer Contact Email: 'ames.C.ha eS CO .Com /JU//G Contact Phone: 265-6927 Authorized Signature: L ^fid Date: / COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may vntness Sundry Number: ,r I rt O •/✓� UI Plug Integrity ❑ BOP Test Mechanical Integrity Test ❑ Location Clearance ❑ Other: BOP f�St to 3 OOo p 51 c. . 11-"v1 v/nr p rr v/rr J-�i Jfo ZSr�n psa rrt�e/ C7p •��+r1 Post Initial Injection MIT Req'd? Yes ❑ No LJ BDM-q— - / MAY 0 2 2019 Spacing Exception Required? Yes ❑ No ©' Subsequent Form Required: !Q_ -40-f APPROVED BY 4-(2-t / p. Approved by: COMMISSIONER THE COMMISSION Date:( / 15 Vr - Farm 1 Oa Revised 4/2017 Approved applic 0-RIG2 r m the date of approval. 141 P -T -L 511117 Submit Form and Anachments in Duplicate ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 29 April 2019 Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7" Avenue Suite 100 Anchorage, Alaska 99501 Dear Commissioner: ConocoPhillips Alaska, Inc. hereby submits an Application for Sundry Approval to work over Kuparuk Producer IF -12 (PTD# 183-136). 1F-12 was originally drilled in September 1983 as an A & C sand producer. The well has a broken latch in one of the production mandrels @ 6,424' MD. The well has developed a leak around the upper Cameo packer and was shut in and put on the workover candidate list. The current plan is to perform a pre -rig tubing cut in the 3 ''/2" completion string at –6,280' MD. The old string will be pulled out and laid down. A new 3 %" 9.34 L-80 completion string with a new packer will be run in hole, over shot on the existing tubing string and stack a new packer. The new packer will be set greater than 200' MD from the C -Sand perfs so and exemption will be requested. — Pim rid– -tht 3 13 Ira t ocn i nJ e- c i- rY If you have any questions or require any further information, please contact me at 265-6927. Sincerely, James Hayes Sr. Wells Engineer CPAI Drilling and Wells IF -12 RWO Procedure Kuparuk Producer PTD #183-136 Pre -Rig Work 1. MIT -OA to 1800 psi. 2. T -POT, T-PPPOT, & IC -POT. 3. Cut the tubing at —6,280' MD in the middle of the first joint above Camco HRP -ISP Packer 4. Install BPV. Rig Work MIRU 1. MIRU on 1F-12. (Nabors 7ES) 2. Remove BPV. Record shut-in pressures on the T & IA. Plug and packer should provide competent barrier. If there is pressure, bleed off IA and/or tubing pressure and confirm no flow. Verify well is dead. a. Primary barrier: Plug, packer and competent casing. KWF will be available as backup primary. b. Secondary barrier: Packoffs and Tree OR BOP. (BPV in place and confirmed in direction of flow while swapping tree to BOP and vice versa.) 3. Set BPV, ND Tree, NU BOPE and test to 250/3,000 psi. Test annular 250/2,500 psi. (5M BOP stack: Annular, 2- 7/8" x 5"VBR, Blind, Mud Cross, 2-7/8" x 5" VBR) Retrieve Tubing Section 4. Pull BPV, MU landing joint and BOLDS. 5. Pull 3 %::"" tubing down to pre -rig cut. Install 3-%" Tubing 6. MU 3 Y: completion with non -sealing overshot, GLM, nipples and packer. RIH and confirm overshot has engaged tubing stub. Space out and land tubing hanger. 7. Drop ball and rod and set packer top @ approximately 6,239' RKB (5,742' TVD) w/ completion. 8. PT tubing to 4200 psi for 5 minutes. 9. PT inner annulus to 2500 psi for 30 minutes on chart. ND BOP, NU Tree 10. Shear out SOV with pressure differential. 11. Install BPV. 12. NO BOPE. NU tree. PT tree. 13. Pull BPV. Freeze protect well. Install BPV. 14. RDMO. Page 1 of 1 I F-12 Proposed Schematic Possible Casing or packer leak Broken Prduction Mandrel Latch C -Sand Pelf 6,343'- 6,470'RK A -Sand Perf 6,568'- 6,628' RKB 26# J-55 shoe @ 6,819' RKB PROPOSED COMPLETION Shoe 108' R BO 3-1/2" 9.3# L-80 EUE Tubing to surface 3-1/2" X -Nipple 3.813" ID (EUE 8rd) 3-1/2" Carrico KBMG gas lift mandrels @ TBD 3-5/8" 40# J-55 shoe W_ 2,254' RKB 3-1/2" 80-40 PBR 3-1/2" x 7" FHL Packer @ —8,240' RKB 3-1/2" X -Nipple 2.813" ID (EUE 8rd) Overshot Possible Casing or packer leak Broken Prduction Mandrel Latch C -Sand Pelf 6,343'- 6,470'RK A -Sand Perf 6,568'- 6,628' RKB 26# J-55 shoe @ 6,819' RKB Vp Nabors I' Material List Item Description A 3.14' 5000# Rem Operated Choke 8 3-14'5000# Allor 1-14 3.14' 50000 Mam 15 2-1/16' 5000# Mar Legend JL WNte Handle Vale. IF NormallyOpen ®Red Hadle Valves Normally Closed Date: 12-3-02 Rev.4 VZ 18313€ 30334 WELL LOG TRANSMITTAL #905113357 To: Alaska Oil and Gas Conservation Comm. January 9, 2019 Atm.: Natural Resource Technician 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RECEIVED FEB 0 5 1019 RE: Leak Detect Log and Plug Setting Records: 117-12 AOGCC Run Date: 01/04/2019 and 11/29/2018 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 FRS_ANC@halliburton.com 1F-12 Digital Data in LAS format, Digital Log file 50-029-21012-00 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline & Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-275-2605 FRS_ANC@halliburton.com Date: �,1/` Signed: ,ge Project Well History File Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. RESCAN DIGITAL DATA OVERSIZED (Scannable) [] Color items: [] Diskettes, No. [] Maps: [] Grayscale items: [] Other, No/Type [] Other items scannable by large scanner [] Poor Quality Originals: ~ OVERSIZED (Non-Scannable) [] Other: · .~E] Logs of various kinds NOTES: [] Other BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: /S/ Project Proofing BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: /S/ Scanning Preparation BEVERLY BREN VINCENT Production Scanning Stage 1 SHERYL~OWELL . / PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: ~. YES NO ~.R~N V,NCE.~ S.ER~L .ARIA LOWELL DATE:It~I.O~/S' ~ IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: YES NO IIIIllllllllll'lllll BY; Stage 2 BY~ (SCANNING 18 COMPLETE AT THIS POINT UNLEE$ SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASLE DUE TO QUALITY. GRAYSCALE OR COLOR IMAGES) RESCANNEDBY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: Is/ General Notes or Comments about this file: Quality Checked • • ConocoPh i I I ~ ps ~~~ P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 March 18, 2008 Mr. Tom Maunder Alaska Oil & Gas Commission 333 West 7~' Avenue, Suite 100 ~ r ; Anchorage, AK 99501 ~~.`:~:i~i~r-~ ~~~` `' ,1,f~~~~-} Dear Mr. Maunder: C~ ~r~~~4 4~ E- ._ ~ R ` ~ 2009 1~~~ iii ~~S ~rvti. GQ j ..y n ~~C~QP~~~. ~IFr~?ya~~f~ .~ ~~ ~ ~' ~ , i Enclosed please find a spreadsheet with a list of wells from-the Kuparuk field (KRU). Each of these wells was found to have a void in the conductor. These voids were filled with cement if needed and corrosion inhibitor, engineered to prevent water from entering the annular space. As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and meets the requirements of form 10-404, Report of Sundry Operations. T'he cement was pumped February 13~', 2009. The corrosion inhibitor/sealant was pumped March 4~', 11~` & 16~', 2009. The attached spreadsheet presents the well name, top of cement depth prior to filling, and volumes used on each conductor. Please call MJ Loveland or Perry Klein at 907-659-7043, if you have any questions. Perl, ~,.,,..a ConocoPhillips Well Integrity Projects Supervisor • ConocoPhillips Alaska Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-ofF Report of Sundry Operations (10-404) Kuparuk Field Date 3/16/2009 Well Name PTD # Initial top of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft al 1F-01A 205-029 7" N/A 7" N/A 1.7 3/16/2009 1F-02 182-211 SF N/A SF N/A 2.90 3/4/2009 1F-03A 196-096 SF N/A SF N/A 2.20 3/4/2009 1 F-04 182-172 20" N/A 20" N/A 5.20 3/4/2009 1F-05 182-132 SF N/A SF N/A 1.60 3/4/2009 1 F-06 182-145 SF N/A SF N/A 2.10 3/4/2009 1 F-07 182-156 SF N/A SF N/A 2.40 3/4/2009 1 F-08 182-162 SF N/A SF N/A 2.20 3/4/2009 1F-10 183-105 20" NA 20" NA 1.70 3/11/2009 1F-12 183-136 54' 7.50 5'6" 2/13/2009 18.70 3/11/2009 1F-13 183-144 SF NA 6" NA 1.30 3/11/2009 1F-16A 201-209 SF NA 22" NA 1.70 3/11/2009 ~~tlum~e~~~ ~'b >~"i~9i1~~'~ ~~~4 ~' lv' ~UU(3 NO. 4707 Schlumberger -DCS 2525 Gambell Street, Suite 400 ~ ~ ~ , ~~ ;~ Anchorage, AK 99503-2838 ~ I i ~ . ? )1 f' ATTN: Beth Well Job # Log Description F! ii /i, i „ f,ti'' - Company: Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Kuparuk Date BL Color CD 05/15/08 ~ 1 F-12 11996623 PRODUCTION PROFILE _ / J 05/01/08 1 1 3J-11 11996624 PRODUCTION PROFILE - C/L( 05/02/08 1 1 3K-102 11963094 MEM PROD PROFILE a0'~ - ~ 05/09/08 1 1 iJ-152 11996632 GLS ( C 05/09/08 1 1 1E-166 11994665 GLS - 05/11/08 1 1 1 E-168 11994665 GLS - 05/10!08 1 1 1H-01 2X-15 11996626 11996634 PRODUCTION PROFILE W/FSI ~ - G, / PRODUCTION PROFILE W/FSI - '.} 05/10/08 05/12/08 1 1 1 1 Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you. • RECE\VED Scblullbepgep ~lp /1. r\ t.£":'> \ 06/13/06 dUN 1 4 ZOOti NO. 3850 ,'\Iasks ŒI Anchorage Schlumberger -DCS 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth ~¡" "i~'ii.Ü ,,_. . à~:·< <;-- ''3 t· "'\I...." Company: Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Kuparuk Well Job# Log Description Color CD Date BL 1-;- 3J-16 11249908 INJECTION PROFILE 06103106 1 1 R-08 11249909 INJECTION PROFILE 06104106 1 3H-11 . 11213760 PRODUCTION PROFILE WIDEFT 05131106 1 1 R-07 11249912 PRODUCTION PROFILE 06107106 'I 1 F-12 11320981 PRODUCTION PROFILE WIDEFT 06106106 1 3G-20 11249911 INJECTION PROFILE 06106106 1 2A-16 11213754 PRODUCTION PROFILE WIDEFT OS/25/06 1 2A-22 11213756 LDL 05127106 1 1Y-04 11320980 LDL 06103106 1 2Z-02 REDO) 11235362 INJECTION PROFILE 05128106 1 1 H-19 REDO) 11320975 INJECTION PROFILE 05129106 1 2A-13 REDO) 11320976 LDL 05130106 1 3J-09 11320977 INJECTION PROFILE 05131106 1 1F-17 11249913 PRODUCTION PROFILE WIDEFT 06108106 1 1J-170 11320983 USIT 06111106 1 I Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you. r ~' , (. ''/ ^ ¡:... / ,C >____.., ç~) /It!tß e e ARCO Alaska,. ~. Post Office Bux ~00360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 March 28, 1991 Mr. David W. Johnston, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Johnston: Attached in duplicate is a Report of Sundry Well Operations for the well listed below. WELL ACTION 1F-12 Stimulate If you have any questions, please call me at 263-4241. P. S. White Senior Operations Engineer J. R. Brandstetter ATO 1120 L. L. Perini ATO 1130 S. M. Renke ATO 1126 KOE1.4-9 w/o attachments RECEIVED Alaska .Oil .& Gas Cons. Coif~m[sSiO[~ ~ch0rag0 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B-6003-C STATE OF ALASKA ~ OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Operation Shutdown Pull tubing Alter casing Stimulate X Plugging Repair well Perforate Other 2. Name of Operator ARCO Alaska. Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development X Exploratory _ Stratigraphic _ Service 4. Location of well at surface 452' FNL, 514' FEL, Sec. 19, T11N, R10E, UM At top of productive interval 1036' FSL, 1317' FEL, Sec. 18, Tll At effective depth 1102' FSL, 1385' FEL, Sec. 18, Tll At total depth 1135' FSL, 1405' FEL, Sec. 18, Tll 12. Present well condition summary Total Depth: measured true vertical N, R10E, UM N, R10E, UM N, R10E, UM 6840 feet 6288' feet 6. Datum elevation (DF or KB) 109' RKB 7. Unit or Property name Kuparuk River Unit feet 8. Well number 1F-12 9. Permit number/approval number 85-136 10. APl number 50-029-21012 11. Field/Pool Kuparuk River Oil Pool Plugs (measured) None Effective depth: measured 6 73 8' true vertical 6194' feet feet Junk (measured) None Casing Structural Conductor Surface Intermediate 'Production Liner Perforation depth: Length Size 80' 16" 2223' 9-5/8" 6790' 7" measured 6434'-6470' MD, true vertical 5916'-5949' TVD, Tubing (size, grade, and measured depth) 3-1/2" J-55 W/Tail @ 6553' MD Packers and SSSV (type and measured depth) Cemented 175 Sx CS II 1000 Sx ASII 600 Sx Class G & 150 Sx AS I 6568'-6576' MD, 6038'-6045' TVD, Measured depth True vertical depth 108' MD 108' TVD 2254' MD 2243' TVD 6588'-6628' MD APE - 4 t99 6056'-6092' TVD Alaska Oil & Gas Cons, Anchorage Baker FB-1 pkr @ 6547'; Camco HRP-lsp pkr @ 6320'; Camco TRDP-1A SSSV @ 1830' MD 13. Stimulation or cement squeeze summary Refracture 'A' Sand Intervals treated (measured) 'A' Sand from 6568' to 6628' MD RKB Treatment description including volumes used and final pressure Refracture 'A' Sand with 95M lbs. 12/18 Carbolite proppant and gelled water. 988 14. Re_oresentative Daily Average Production or Injecti0n Dat.a OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Prior to well operation 8 0 0 /' 5 8 0 I 9 0 8 0 0 Subsequent to operation 2 3 0 0 I 7 8 0 6 3 0 1 4 0 0 2 2 5 Tubing Pressure 210 ssi0n 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations. X 16. Status of well classification as: Water Injector_ Oil X Gas Suspended Service hereb certify that the foregoing is true and correct to the best of my knowledge. Signed ' Title Sr. Operations Engineer Form 10-404 Rev 09/12/90 Date 3/28/91 SUBMIT IN DUPLICATE _ARCO Alaska, I ,..~ Subsidiary of Atlantic Ricl~field Company WELL SERVICE REPORT -, WELL IF-/~ CONTRACTOR REMARI~S' - IPB~T I FIELD- DISTRICT. STATE 75~' I K~.u, J OPERATION AT REPORT TIME I DAY~, DATE PP- K _,~ m T ~ /,v ~ _~_ ~ ,,:.,_ ~-z. /~/~ / 7,,rq CHECK THIS BLOCK IF SUMMARY CONTINUED ON BACK Weather Report J , - ¢ °1: mil. / REMARKS CONTINUED: _~_ DESCRIPTION DAILY ACCUM, TOTAL CAMCO I OTIS SCHLUMBERGER DRESSER-ATLAS ~/...~ ~/Z~ DOWELL ---'-'- HALLIBURTON ARCTIC COIL TUBING FRACMASTER Diesel i Methanol Supervision Pre-Job Safety Meeting AFE TOTAL FIELD ESTIMATE STATE OF ALASKA ALAS~.. OIL AND GAS CONSERVATION COMIv,._.SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend _ ' Operation Shutdown .. ] Re-enter suspended well T; Alter casing ['; T,me extension Change approved program Plugging "~. Stimulate .~ Pull tubing Amend order ,r Perforate ~' Other Name of Operator ARCO Alaska, Inc 3 Address PO Box 100360, Anchoraqe, AK 4. Location of well at surface 99510 452' FNL, 514' FEL, Sec.19 T11N RIOE UM At top of probluctive ~nterval ~ ' ' 1036' FSL, 1317' FEL, Sec.18, T11N, RIOE, UM At effective depth 1102' FSL, 1385' FEL, Sec.18, T11N, RiOE, UM At total depth 1135' FSL, 1405' FEL, Sec.18, T11N, RIOE, UM 11. Present well condition summary Total depth: measured 6840' ND feet true vertical6288, TVD feet RI~I~ D~bugm elevation (DF or KB) 6. Unit or Property name Kuparuk River Unit 7. Well number 1F-12 8. Permit number Permit #85-136 0~;z~8¥~ber 10. Pool Kuparuk River Oil Pool feet Plugs (measured~one Effective depth: measured 6 ' feet true vertical ~ 738 MD feet 194' TVD Casing Length Size Cemented Measured depth True Vertical depth x x x,~--'X~c,t~w~ k x x x x Conductor 80' 16" 175 SX CSII 108' 108' Surface 2223' 9-5/8" 1000 SX ASIII & 2254' 2243' XXX;t~t,~N'R~j~te 250 SX ASI Production 6790' 7" 600 SX Class G 6819' 6268' xxx~xxxx & 150 SX ASI Perforation depth: measured 6434' -6470' 6568' -6576' 6588' -6628' MD true vertical5916,_5949, 6308'-6045' 6056'-6092' TVD Junk (measured) None Tubing (size, grade and measured depth) 3~ J-55 tbg w/tail @ 6553' MD Packers and SSSV (type and measured depth) Bake~ FB-1 pkr ~ 6522'; CAMCO HRP-!SP pkr ~ 6310'; CA~CO TRDP-]~ SSSV ~ ]R~fl' MD 12.Attachments Description summary of proposal Perforate A5 Sands. 13. Estimated date for commencing operation July ~ 1988 ~,,~.,,~ W_-?_t: ~e~--e_.-~__ _-,,-_ 14. If proposal was verbally approved Name of approver /'-~e Date approved 15.1 here, b~cer~ that,,~h_e f~ and correct to the best of my knowledge Signed( ~/~"~,.J ~J/'J"q~'! J Title Sr. Operations Engineer / Commission Use Only Date 6/29/88 Conditions of approval Notify commission so representative may witness ~ Plug integrity [] BOP Test ~. Location clearance ~,pproved Copy Returned Commissioner ORIGINAL SlGNED 8Y LONNIE C. SMITH Approved by JApproval No. by order of the commission Date ~.-r ~' Form 10-403 Rev 12~-85 Submit in triplicate Well 1 F-12 General Description Well 1F-12 is currently a combined A and C Sand oil producer. Proposed perforations in the A5 Sands will open to production the reserves isolated behind pipe and commingle the production with the C Sands and A4 Sands. The proposed work will utilize an E-line unit and surface equipment to lower a perforating gun through tubing to expose the A5 Sands to the wellbore. The lubricator will be pressure tested to 4000 psi against the 5000 psi tree valves. Static bottomhole pressures from a wellhead pressure and fluid level are 2400 psi in the A Sands and 3200 psi in the C Sands. Procedure 1. MIRU E-line perforating unit. Pressure test lubricator. 2. RIH and tie in depths using Cement Bond Log dated November 14, 1983. 3. Open well to production to establish drawdown. 4. After verifying well is flowing, perforate from 7816'-7830' at 12 SPF. 5. Allow stabilization and obtain NC Sand test. ARCO Alaska Inc. is a subsidiary of Atlantic Richfield Company AR3B-6001-A ARCO Alaska, Inc. -- _ Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 July 7, 1988 Mr. C. V. Chatterton, Chairman Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton' Attached are two Applications for Sundry Approvals. One is a request to add additional perfs in the A Sand (A5 Sand) and the other is a request to convert a production well to a water injector. Well Action Anticipated Start Date ~.12~]~ Perf A5 Sand July, 1988 3K-18 Conversion July, 1988 If you have any questions, please call me at 265-6508. Sincerely, M. E1 dred Senior Operations Engineer JME:cp:O092 Attachments cc: File KOE1.4-9 ARCO Alaska, Inc. is a Subsidiary of AllanlicRichfieldCompany STATE OF ALASKA ' ALASK, _~IL AND GAS CONSERVATION COMM, .ION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing [] Alter Casing [] Other ~ 2. Name of Operator ARCO Alaska, Irc 3. Address PO Box 100360: Anchnrag¢.; AK 99510 4. Location of well at surface 452' FNL, 514' FEL, Sec.19, T11N, R10E, UM At top of productive interval 1036' FSL, 1317' FEL, Sec.18, T11N, RIOE, UM At effective depth 1102' FSL, 1385' FEL, Sec.18, T11N, RIOE, UM At total depth 1135' FSL, 1405' FEL, Sec. 18, T11N, RIOE, UM 5. Datum elevation (DF or KB) RKB 109' 6. Unit or Property name K;!par:!~ l~!ve_,- Unit 7. Well number 1F-12 8. Approval number #7-346 9. APl number 50-- 029-21012 10. Pool Kuparuk River Oil Pool 11. Present well condition summary Total depth: measured 6840' ND feet true vertical 6288' TVD feet Plugs (measured)NOne Effective depth: measured 6738' ND feet true vertical 6194' TVD feet Junk (measured) None Casing Structural Conductor Surface XXX~k'~~¢e Production xxxk~<xxxx Perforation depth: Length Size 80' 16" 2223' 9-5/8" 6790' 7" measured Cemented Measured depth True Vertical depth 175 SX CSII 108' MD 1000 SX ASII 2254' MD & 250 SX ASI 600 SX Class G 6819' MD & 150 SX ASI 6434'-6470' MD, 6568'-6576' MD, 6588'-6628' MD 108' TVD 2243' TVD 6268' TVD true vertical 5916'-5949' TVD, 6038'-6045' TVD, 6056'-6092' TVD Tubing (size, grade and measured depth) -'" J-55 tbg w/tail @ 6553' MD Packers and SSSV (type and measured depth) Baker FB-1 pkr @ 6522'; Camco HRP-lSP pkr @ 6310'; Camco TRDP~-I_A~SS_S.V.@ 1830' MD L, IvED 12. Stimulation or cement squeeze summary 13. Intervals treated (measured) Treatment description including volumes used and final pressure Alaska 0ii & Ga,, Cons. Representative Daily Average Production or Injection Data,u`'; Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 490 BOPD 290 MCFPD 0 BWPD 320 psig Feet 190 psig Date ¢ f-~ ~ Submit in Duplicate /"y/ Subsequent to operation 450 BOPD 260 MCFPD 0 BWPD ;)50 psig lC~fl .n~ig 14. Attachments Daily Report of Well Operations -I~ Copies of Logs and Surveys Run [] 15.1 hereby certify that the foregoing is true and correct to the best of my knowledge Signed Form 10-4~04 Rev. 12_¢/-85 Title Sr. Operations Engineer - A~CO Alaska, Inc..,~- --' Sul~idl~ry of Atlantic Richfield Company WELL SERVICE REPORT [-'] CHECK THIS BLOCK IF SUMMARY CONTINUED ON BACK -'~-" STATE OF ALASKA ~- ' ALA~ .)IL AND GAS CONSERVATION COIV,..~-51ON APPLICATION FOR SUNDRY APPROVALS' 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate [] Other 2. Name of Operator ARCO Alaska, Inc 3. Address PO Box 100360, Anchoraqe, AK 99510 4. Location of well at surface 452' FNL, 514' FEL Sec. 19 T11N R10E UM At top of productive interval' ' ' ' 1036' FSL, 1317' FEL, Sec.18, T11N, R10E, UM At efS~;iv~ depth 1I SL, 1385' FEL, Sec.18, TI-IN, RIOE, UM At total depth 1135' FSL, 1405' FEL, Sec. 18, T11N, RIOE, UM 11. Present well condition summary Total depth: 5. Datum elevation (DF or KB) RKB 109' 6. Unit or Property name Kuparuk Riv~.r Unit 7. Well number 1F-12 8. Permit number Permit #85-136 9. APl number 50-- 029-21012 10. Pool K~paruk Rivpr Oil Ponl measured 6840' MD feet Plugs (measured) None true vertical 6288' MD feet feet Effective depth: measured 6738' MD feet Junk (measured) None true vertical 6194' MD feet Casing Length Size Structural Conductor 80 ' 16" Surface 2223' 9-5/8" Production 6790 ' 7" xx _i'r xxxxx Perforation depth: measured Cemented Measured depth 175 SX CSII 108' MD 1000 SX ASII 2254' MD & 250 SX AS1 600 SX Class G 6819' MD & 150 SX AS1 6434'-6470' MD, 6568'-6576' MD, 6588'-6628' MD ~ue Vertical depth 108' TVD 2243' TVD 6268' TVD true vertical 5916'-5949' TVD, 6038'-6045' TVD, 6056'-6092' TVD Tubing (size, grade and measured depth) 3½" J-55 tbg w/tail @ 6553' MD Packers and SSSV (type and measured depth) Baker FB-1 pkr @ 6§22'; Camcn HRP-ISP .nl<r ra 12.Attachments Description summary of proposal [] Detailed operations program [] BOP sketch [] See Attached Information 13. Estimated date for commencing operation March 24, 1987, 1987 14. If proposal was verbally approved Name of approver M.L. Smith Date approved 3/23/87 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~,'¢~~~ ~'" Title Commission Use Only Conditions of approval Notify commission so representative may witness I Approval No. [] Plug integrity [] BOP Test [] Location clearance I Approved by Form 10-403 Rev 12-1-85 Commissioner Date5/19/87 by order of the commission Date~ Submit in triplicate KUPARUK WELL 1F-12 Well 1F-12 has a wash tool stuck in the SSSV at 1830' MD and currently requires a well watcher on site 24 hours a day. A K-valve storm choke will be set at 500' MD, above a tight spot at 519' MD, until a snubbing unit can be brought on site to remove the wash tool from the wellbore. ARCO AlasKa. lnc/ Post Office uox 100360 Anchorage. AlasKa 99510-0360 Telephone 907 276 1215 RETURN TO: ARCO ALAS~, LNC. ATTN: Kuparuk Records Clerk ATO 1119 P. O. Box 100360 DATE 01-28-86 TRANSMITTAL # 5533 ~nchorage A:< 99510-0360 Transmitted herewith are the followinc items Please acknowledge receipt and ?ran _ o return one signed cody of this transmittal. Final Prints/ S~ul/ Open Hole/ One * of each ./'-3F- 11 J'~ 3F-13 5" DiL/SFL 12-05-85 Run #1 0150-8588 2" DiL/SFL 12-05-85 Run #1 0150-8588 5" Den/Neu (poro) 12-05-85 Run #1 7750-8563 2" Den/Neu (port) 12-05-85 Run #1 7750-8563 5" Den/Neu (raw) 12-05-85 Run #1 7750-8563 2" L~_n/Neu (raw) 12-05-85 Run #1 7750-8563 Cyberiook 12-05-85 Run #1 7950-8300 5" DiL/SFL-GR 12-11-85 Run #1 2" DiL/SFL-GR 12-11-85 Run #1 5" Den/Neu (poro) 12-10-85 Run #1 2" Den/Neu (poro) 12-10-85 Run #1 5" Den/Neu (raw) 12-10-85 Run #1 2" Den/Neu (raw) 12-10-85 Run #1 Cyberlook 12-10-85 Run #1 5" DiL/SFL-GR 12-19-85 2" D!L/SFL-GR 12-19-85 5" Den/Neu-GR (poro} 12-19-85 2" Den/Neu-GR (poro) 12-19-85 5" Den/Neu-GR (raw) 12-19-85 2" Den/Neu-GR (raw) 12-19-85 C~oerloo~ 12-19-85 1650-7565 1650-7565 3800-7332 3800-7332 3800-7332 3800-7332 3800-7332 Run #1 1690-8089 Run #1 1690-8089 Run #1 4490-8064 Run #1 4490-8064 Run #1 3647-8064 Run #1 3647-8064 Run #1 7250-8089 Receipt Acknowledged: State of AK*bl/se NSK C!erk*b! Date: ....... Drilling*bi Ra~n~el!*bl D & M'b! Vault*films ARCO Aia$[a. inC. ,$ a Suo$~olary Of Atlant,cf;;~_-~tiel~Com~an¥ ARCO Alaska, Inc .... . Post'Offic~/- 360 Anchorage, Aiaska 99510 Telephone 907 277 5637 RE TIIR_N TO: ARCO ALASKA, INC. ATTN: Records Clerk ATO-1115B P~O. Box 100360 · ~Anchorage, AK 99510 £/ Transmitted herewith are the following items. g/ and return one signed copy of this transmittal. Date: 2/05/85 Transmittal No: 4824 Please acknowledge receipt PBU SURVEYS & SEQUENCE OF EVENTS --2X-7/ 8/16/84 ~ 2Z-6/ 9/03/84 2X-6~ 8/16/84 2X-4/ 8/16/84 ~-2X-1V 8/16,19/84 --2V-5~-/ 8/16,19/84 ~-2V-2~ 9/07/84 8/28/84 --2F-s-v). lO/O8/84 -- 2F-7v' 10/07/84 _2B-15/ 9/03/84 ~2C-5 / 8/17/84 ~-lY-t3/ 8/16/84 ~lY-9/ 9/07/84 ~lY-5~ 9/14/84 1Y-5~ 9/06/84 ~lG-6~' '8/25/84 ~lH-4v 9/04/84 --1F-12~ 9/09/84 ~-lF-9 ~' 8/17,18/84 <-lF-8~ 8/16 17/84 / --1E-8~/ 10/12/84 ~-lD-5/ 10/07/84 ~lA-4~ 9/02/84 -'-lA-3/ 9/02/84 Gearhart Otis Gearhart Camco Camco Dresser Otis Otis Camco Otis Otis Otis Dresser Camco Camco Otis Otis Otis Otis Camco Camco Otis Camco Otis Otis Receipt Acknowledged: B. Currier Drilling "HP 232" "PIP 233" 9/o /84 9/05/84 "Static BHP" 8/17/84 "PBU"" 8/16/84 "PBU" 10/13/84 "SBHP" "E Line" 10/07/84 "Pressure Falloff" DISTRIBUTION W. Pasher State of AK BPAE Geology G. Phillips Sohio Chevron Mobil Phillips Oil Union D&M NSK Ops. J. Rathmell Well Files ARCO Alaska, In¢ ;..r, cho;age. Alaska 99510 ~,~!e~hc, ne 907 277 5637 Date: 9/04/84 Transmit tal No: 4712 Return To: ARCO ALASKA, Inc. ATTN: Records Clerk ATO-1115B P.O. Box 100360 Anchorage, AK 99510 /a~ransmitted herewith are the following items. Please acknowledge receipt and return one signed copy of this transmittal. PRESSURE ANALYSIS/PBU SURVEYS & SEQUENCE OF EVENTS 1E-12 '~ PBU "BOMB"- 8/17/84 1E-15 '~-' S'~'i-C" ~HP 8/05/84 1F-2 u,o- SIBHP 6/04/84 iF- 3 '-' .~_P_B.U,~ 4 / 30 / 84 1F-4 / SIBHP 6/04/84 1F-6- SIBHP 6/05/84 1F-7 ~ SIB~ 12/19/83 1F-7 .... SlBHP 6/05/84 1F-7 -' SIB~ 4/30/84 1F-9--~ GAS LIFT SURVEY 4/29/84 1F-9~' ..... '~PBU/DRAWDOWN SAND' 12/26/83 1F-10 --i~0/DRAWD0~ 12/20/83 1F-10~ DRA~WDOWN 12/21/83 1F-11-. ~'B0? 12/23/83 1F-11-~~/-~~wN-~3/15/84 1F-11--' ~UTDRAWDOW~'~-- 12/24/83 1F-12 .... .~O/~RAWDO~A 3/09/84 1F-12-~ (~BU-"A" S~ND~? 7/03/84 1F-12 ~ ?BU/?DD 3/10/84 1F-12~ ?BU/PDD "A" 3/09/84 ZF-13~C~Rp "A" S,~VO~ 5/03/84 II II 1F-13-~× S ~H.~r~NE_W_I"_~ 1/26/84 1F-16~ C~u "A" SA~> 5/O4/84 Receipt Acknowledged: 1F-16~' 1F-16 ~ /cat DISTRIBUTION B. Adams F.G. Baker D&M Drilling P. Baxter Geology BPAE Mobil LOGS & PBU_"A" S~AND ~/04/84 ; , ?~u & L~,S~ ~/;'~/0~Z~ Date: .... '-' '.: : !!'~-~ -.,.: ~'~ f ,. ,~- W.V. Pasher C.R. Smith G. Phillips State'Of Alaska Phillips Oil Sohio J.J. Rathmell Union R & D Well Files Chevron ~SK Operations ARCO Alaska, Post Oftice Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 August 10, 1984 Mr. C. V. Chatterton State of Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Attached following in duplicate are subsequent wells at the Kuparuk River Well Action notices Field: on Date Performed .. ., the 1F-11 Fracture 6/25/84 1F-12 Per forate 6 / 29 / 84 1F-12 Fracture 7/08/84 1G-6 Re-perforate 8/01/84 1G-7 Fracture 7/29/84 1G-8 Fracture 7/23/84 2B-7 Perforate 7/24/84 2B-8 Perforate 7/25/84 2B-9 Perforate 7/27/84 If you have any questions, please call me at 263-4253. Mike L. Laue Kuparuk Operations Coordinator MLL/kmc Attachment (Duplicate) RECEIVED AUG ! l llt4 Oil & Gas Cons, Commission A:~chorag~ ARCO Alaska, Inc. is a Subsidiary of AtlanticRichlieldCompany STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator ARCO ALASKA, INC. 3. Address P. O. BOX 360, ANCHORAGE, ALASKA 4. Location of Well SURFACE LOCAT ! ON- 452 ' T11N, R10E, UM BOTTOMHOLE LOCAT I ON- T11N, R10E, UM 5. Elevation in feet (indicate KB, DF, etc.) 109 ' (RKB) 99510 12. FNL, 514' FEL, Sec. 19, 1200 FSL, 1300' FEL, Sec. 7. Permit No. 83-136 8. APl Number 50- 029-21 012 9. Unit or Lease Name KUPARUK RIVER UN IT 10. Well Number 1F-12 1 8 11. Field and Pool KUPARUK RIVER FIELD 6. Lease Designation and Serial No. KU PARUK R I VER O I L ADL 25652, ALK 2578 POOL Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation ~] Abandonment [] [] Change Plans [] Repairs Made [] Other [] [] Other [] Pulling Tubing [] Repair Well Pull Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). On July 8, 1984, the "A" sands of Kuparuk well hydraulically fraCtured and propped to improve treatment consisted of 240 BBLS of gelled water fluid and 13,100 LBS of 12/20 sand as proppant. 1F-12 were production. The as pad and carrying Prior to pumping, equipment and sand was tagged with R.A. tracer performance. lines were tested to 7100 psi. The to aid determination of job RECEIVED AUG ]984 Alaska Oil & Gas Cons. Commission Anchorage 14. I hereby certify that the foregoing is true and correct to the best of my k.np_wl.ed_g.e, o Signed Title OPERATI ONS COORD I NATOR Date The space below for Commission use Conditions of Approval, if any: Approved by By Order of COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 August 10, 1984 Mr. C. V. Chatterton State of Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton. Attached in duplicate are subsequent following wells at the Kuparuk River notices on the Field: Well Action Date Performed 1F-11 Fracture 6/25/84 1F-12 Perforate 6/29/84 1F-12 Fracture 7/08/84 1G-6 Re-perforate 8/01/84 1G-7 Fracture 7/29/84 1G-8 Fracture 7/23/84 2B-7 Perforate 7/24/84 2B-8 Perforate 7/25/84 2B-9 Perforate 7/27/84 If you have any questions, please call me at 263-4253. Mike L. Laue Kuparuk Operations Coordinator MLL/kmc Attachment (Duplicate) RECEIVED AUG ! 191 OJ] & Gas Cons. Commission A:~chera.q~ ARCO Alaska, Inc. is a Subsidiary of AllanlicRichfieldCompany ~-" ~'~' STATE OF ALASKA '-~ f-" ALASKA OIL AND GAS CONSERVATION L, OMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [~ 2. Name of Operator 7. Permit No. ARCO ALASKA, INC. 83-136 3. Address 8. APl Number P. O. BOX 360, ANCHORAGE, ALASKA 99510 50- 029-21012 OTHER [] 4. Location of Well SURFACE LOCAT ! ON- 452 ' T11N, R10E, UM FNL, 514' FEL, Sec. 19, BOTTOMHOLE LOCATION. 1200 FSL, 1300' FEL, Sec. 18 T11N, R10E, UM 5. Elevation in feet (indicate KB, DF, etc.) 109 ' (RKB) 12. I 6 . Lease Designation and Serial No. ADL 25652, ALK 2578 9. Unit or Lease Name KUPARUK RIVER UN I T 10. Well Number 1F-12 11. Field and Pool KUPAR~JK RIVER FI ELD KUPARUK RIVER OIL POOL Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF: (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on'Form 10-407 with a submitted Form 10-407 for each completion.) (Submit in Duplicate) ~ Altering Casing [] ~-_] Abandonment [] [] Other [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). On June 29, 1984, the "A" sands of Kuparuk well 1F-12 were perforated for production. After testing the lubricator to 2800 psi, the well was shot with a wireline conveyed gun. Interval (MD)- 6588'=6628' (2SPF) RECEIVED AUG ] ]984' Alaska 0il & Oas Cons. Corr~,missJ0n 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Si§ned Title OCF:RAT The space below for Commission use Conditions of Approval, if any: 8/9/84 By Order of Approved by COMMISSIONER the Commission Date __ Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, I, Post Office BOx 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 June 19, 1984 Mr. C. V. Chatterton Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Attached are notices of intention to stimulate Kuparuk wells 1F-11 and 1F-12. If you have any questions, please call me at 263-4253. Mike L. Laue Kuparuk Operations Coordinator MLL/kmc Attachment (In Triplicate) JUN 1 9 Oil & G~s Cons, CommiSsion Anchorage Alaska. Inc. is a Subsidiary ol AllanticRichfieldCompany ~------'- STATE OF ALASKA ~ ~-'- ALASK ...... AND GAS CONSERVATION ,_ _~...MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED W. ELL I}N[ OTHER [] 2. Name of Operator 7. Permit No. ARCO ALASKA, INC. 83-136 3. Address 8. APl Number P. O. BOX 360, ANCHORAGE, ALASKA 99510 50- 029-21012 9. Unit or Lease Name 514' Sec. KUPARUK RIVER UNIT 4. Location of Well SURFACE LOCAT ION- 452 ' T11N, R10E, UM FNL, FEL, 1 9, BOTTOMHOLE LOCATION. 1200 FSL, 1300' FEL, Sec. 18 T11N, R10E, UM 5. EleVation in feet (indicate KB, DF, etc.) 109' (RKB) 6. Lease Designation and Serial No. ADL 25652, ALK 2578 10. Well Number 1F-12 ,1 1. Field and Pool KUPARUK RIVER FIELD KUPARUK RIVER OIL POOL 12. Check ApprOpriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate ~ Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). It is proposed that the "A" sand in Kuparuk well 1F-12 be hydraulically fractured and propped to improve producti'on. The treatment uses gelled water as the pad and carrying fluid and 12/20 sand as the proppant. Lines and equipment will be pressure tested to 5000 psi prior t~ starting job. Radioactive tagging of the proppant and pre/post frac logs are included in the treatment program. Fluid- 390 BBLS water Proppant: 24,000 LBS 12/20 sand ANTICIPATED START DATE. June 25, 1984 · SuBsequent IVort~ 1RepSrte~ RECEIVED JUN ! 9 ]91M Alaska 011 & (~as Oons. Commlssloa Anchorage 14.1 hereby certify that the foregoing is true and correct to the best of m,y/~<p, qv~lF~g~lz ~Ur~U~ Signed _~///'~~,,~_...__ Title OPE RATIONS COO RD I NAT OR The space below for Commission use 6/19/84 Date Conditions of Approval, if any: Approved by. 6Rl itt,kl. SIGNED BY -[OHqtE C. SMITH Approved Co,- Returned By Order of COMMISSIONER the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ~-_. ~-- -STATE OF ALASKA .... ~'- ALASK¢ 'AND GAS CONSERVATION C , ./ilSSION SUNDRY NOTICES AND REPORTS ON WELLS 1. ~ DRILLING WELL [] COMPLETED WELL I~ OTHER [] 2. Name of Operator ARCO A~ASKA, INC. 3. Address P. O. BOX 360, ANCHORAGE, ALASKA 99510 4. Location of Well SURFACE LOCATION- 452' FNL, 51 4' FEL, Sec. 19, T11N, R10E, UM BOTTOMHOLE LOCATION- 1200 FSL, 1300' FEL, Sec. T11N, R10E, UM 5. Elevation in feet (indicate KB, DF, etc.) 109 ' (RKB) 12. 6. Lease Designation and Serial No. 7. Permit No. 83-136 8. APl Number 50- 029-21 012 9. Unit or Lease Name KUPARUK RIVER UN IT 10. Well Number 1F-12 1 8,11. Field and Pool KUPARUK RIVER F ! ELD KUPARUK RIVER OIL ADL 25652, ALK 2578 POOL Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data Perforate [] Stimulate [] Repair Well [] Pull Tubing NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) r~ Alter Casing [] Perforations [] Altering Casing [] Abandon [] Stimulation [] Abandonment [] Change Plans [] RePairs Made [] Other [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.} 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). It is proposed that the "A" sand in Kuparuk well 1F-12 be re-perforated to optimize upcoming stimulation. Procedures call for the well to be perforated with a wireline conveyed gun under a lubricator. PROPOSED INTERVAL (MD)- 6588'-6628' (2SPF) ANTICIPATED START DATE- June 19, 1984 Subsequent ~Vor]: l~eport~cl RECEIVED JUN 1 191 4 Oil & Gas Cons. Commission Anchorage KUPARUK Signed ~~~)~/-"/~ Title OPERATIONS COORDINATOR The space below for Commission use 6/15/84 Date Conditions of Approval, if any: Approved by. gRIGI. NAL SIGN[9 OT tl)HNlE C. SlIlTll Approved Copy Returned By Order of COMMISSIONER the Commission Date Form 1T403 Rev. 7-1i-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate KUPARUK ENGINEERING Date: ~~ Well Name: Transmittal Date Run # o/i-7 '°/, DISTRIBUTION NSK Operat ions Dr il 1 ing Geolbgy /Ken State of AK Blu clone Blu el ine Film Blueline & Sepia copy as receipt of" data.~,~;,-~_~.~,~-~ .!,~: ~' ::.- .',', c :: U','.9 ,.:, .... · !.~..'~,>.. ,_~ , .. ... ~ ' cr~r~!,e,.g/O~ .. Return to: ARCO ALASKA, INC. ATTN: P',quu,,I ~I.W&ITt~o ATO-1115B P.0. Box 100360 Anchorage, AK 99510 c~ 'F]N~ L -~" KUPARUK ENGINEERING These prints replace the previous ones sent in January, 1984, please destroy the .o.ld p~ints as the elevation numbers were in- ' correct. Date: Well Name: Transmittal ***_****************************** Log 2/~,~ Date DISTRIBUTION NSK Operation Blueline Dr ill ing Blueline Geology/L. J. Bi/Se R&D Blue!ine D&M ~e .~. Baker Blue. line D.B. Schaf er Blueltne G eology/Ken Film Run f/ / / ! / Sign & return the attached copy as reDeSpt of ,~aqt'~ i \/ ~ :.~!L '. ~7.¢~ '¥tska O I ?, Gas C~'.n~ Commission Re turn t o: ARCO-' ALAS~,.,;.0rI~C. ATTN: D. Fay ALLISON ATO-1115B P.0. Box 100360 Anchorage, AK 99510 OHFinal KUPARUK ENGINEERING · Date: ~,:~,/~/ Well Name: Transmittal Date Run ~L DISTRIBUTION NSK Operation Blueline Dr i~ling :- Blueline Geology/L. J. B1/Se ... R&D Blueline D&M Blueline State Bi/SE F.G. Baker Blueline D.B. Schafer Blueline Geology/Ken Film Sign & return the attached copy as receipt of data. Return to: ARCO ALASKA, INC. ATTN: D. Fay ALLISON ATO-1115B P.0. Box 100360 Anchorage, AK 99510 KUPARUK ENGINEERING TRA~SM!TTAL #~/~ TO' FROM: D. Fay Allison WELL NAME- Transmitted herewith are 'the following: see below PLEASE NOTE' BL - BLUELINE, S - SEPIA, F - FILM, T - TAPE, PC - PHOTOCOPY Well Description Date Run / ~PT ACKNOWLEDGED: L/ ~EASE RETURN RECEIPT TO- ARCO ALASKA, INC. ~--~'~ Oil & Gas Cons. ATTN D FAY ALLISON - ATO/1115-B~'"~'~" P. O. BOX 100360 ' ANCHORAGE, AK. 99510 ARCO Alaska, Inc.~ ~ Post Office r.,.,_ ,~60 Anchorage, Alaska 99510 Telephone 907 277 5637 January 30, 1984 Mr. C. V. Chatterton State of Alaska Oil and Gas Conservation 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton' Commission Attached in duplicate are subsequent notices on the following wells at the Kuparuk River Field: Well Action Date Performed 1F-12 Perforation 1/21/84 Stimulation 1/23/84 2C-2 Acid Wash 1/13/84 If you have any questions, please call me at 263-4527. Charles K. House Kuparuk Operations Coordinator C KH / kmc Attachment (Duplicate) JAN2 7 lgB~ A,~,~.~ 0~I & Gas Cons. Commis:i~,~ ARCO Alaska. Inc. is a subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA OiL AND GAS CONSERVATION COIVlMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] 2. Name of Operator ARCO ALASKA, INC. 3. Address P. O. BOX 360, ANCHORAGE, ALASKA 99510 COMPLETED WELL OTHER [] 4. Location of Well SURFACE LOCATION' 452' FNL, 514' T11N, R10E, UN BOTTOMHOLE LOCATION' T11N, R10E, UM 5. Elevation in feet (indicate KB, DF, etc.) 109 ' (RKB) 12. FEL, Sec. 19, 1200 FSL, 1300' FEL, Sec. 7. Permit No. 83-136 8. APl Number 50- 029-21012 9. Unit or Lease Name KUPARUK RIVER UNIT 10. Well Number 1F-12 1 8 11. Field and Pool KUPARUK RIVER FIELD 6. Lease Designation and Serial No. KUPARUK R I VER O I L ADL 25652, ALK 2578 POOL Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations )~ Altering Casing [] Stimulate [] Abandon [] Stimulation ~ Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). On 1-21-84 acidized "C" sand not successful in increasing were approximately 25_~B_QPD. 1803 GALS; Diesel 45 BBLS. with 12% HCL using a CTU. ~timulat~ rate. Both pre-acid and post acid rates Volumes used'~ 12% HCL 39 BBLS; Nitrogen On 1-23-84 perforated "A" 6568-6576' and 6588-6628'. 610 BOBD sand with 4 jet shots/ft, in intervals of Follwing "A" sand perforation well tested at RECEI'VE[.) ,JAN2 ? ].984 .Al~sk:~ Oil & G~s Co~s, Commission 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. The space below for Commission use O P E RAT I ON S COORDINATOR Conditions of Approval, if any: By Order of Approved by. COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc./'- Post Office ~.,,,, ,~60 Anchorage, Alaska 99510 Telephone 907 277 5637 January 9, 1984 Chat Chatterton State of Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Chat' Attached in duplicate are subsequent notices of acid stimulation on the following wells at the Kuparuk River Field' Wel 1 IF-10 Wel 1 iF-il :~:ell 1F-12 If you have any questions, please call me at 263-4527. Charles K. House Kuparuk Operations Coordinator CKH/kmc Attachment (Duplicate) ARCO Alaska. tnc, is a subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ALASKA u~L AND GAS CONSERVATION CL~MMISSION SUNDRY NOTICES AND REPORTS ON WELLS OTHER DRILLING WELL [] COMPLETED WELL 2. Name of Operator ARCO ALASKA., INC. 3. Address P. O. BOX 360, ANCHORAGE, ALASKA 99510 4. Location of Well SURFACE LOCATION' 452' T11N, R10E, UM FNL, 514' FEL, Sec. 19, BOTTOMHOLE LOCATION' 1200 FSL, 1300' FEL, Sec. 18 T11N, R10E, UM 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 7. Permit No. 83-136 8. APl Number 50- 029-21012 9. Unit or Lease Name KUPARUK RIVER UNIT 10. Well Number 1F-12 11. Field and Pool KUPARUK RIVER FIELD KUPARUK RIVER OIL 10q' 12. (_RKB) ADL 25652. Al K 2578 POOL Check Appropriate Box To Indicate Natur% of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF' (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) (Submit in Duplicate) [] Altering Casing [] ~] Abandonment [] [] Other [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). "C" sand was acidized 12-10-83 using 15% HC1. Well had not flowed it was perforated, acid treatment on 11-25-83 failed to stimulate because acid was left across perforations for an extended time. stimulation (12-10-83) resulted in post treatment rate of 101 Volumes used were: Acid 30 BBLS Nitrogen 240,000 SCF Diesel 38 BBLS since well This BOPD. RECEIVED ' ~ -.' '~ ~.~.~,~ .... 14. I hereby c_erti,~y that t.~e foregoi,~g is~true and correct to the best of my knowledge. Signed ~~~"~ ~I~''~-'~''~' Title KUPARUK The space below for Commission use OPERAT IONS COORDINATOR Conditions of Approval, if any: Date Approved by By Order of COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. ' Post Office B~,,. 360 Anchorage, Alaska 99510 Telephone 907 277 5637 January 9, 1984 Mr. C. V. Chatterton State of Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton' Attached are Sundry Notices of Intention following Kuparuk Wells' 2C-1 Mud Flush 2C-2 Acid Wash 1Y-2 Acid Stimulation 1Y-10 Acid Stimulation 1Y-15 Acid Stimulation 1F-10 Perforate "A" Sand 1F-11 Perforate "A" Sand 1F-12 Perforate "A" Sand for work on the If you have any questions, please call. me Charles K. House Kuparuk Operations Coordinator CKH/kmc Attachment (In Triplicate) at 263-4527. ARCO Alask,~. ii~::, is a subsi,~i~ry Of Atl3nticRichfieldCornpany STATE OF ALASKA ALASKA O~L AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator ARCO ALASKA, INC, 3. Address P. O. BOX 360, ANCHORAGE, ALASKA 99510 4. Location of Well SURFACE LOCATION' 452' FNL, 514' FEL, T11N, R10E, UM Sec. 19, BOTTOMHOLE LOCATION' T11N, R10E, UM 5. Elevation in feet (indicate KB, DF, etc.) 109 ' dRKB~ 12. 1200 FSL, 1300' FEL, Sec. 6. Lease Designation and Serial No. ADL 25652. ALK 7. Permit No. 83-136 8. APl Number 50- 029-2[012 9. Unit or Lease Name KUPARUK RIVER UNIT 10. Well Number 1F-12 1 8 11. Field and Pool KUPARUK RIVER. FIELD KUPARUK RIVER OIL 2S78 POO! Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate ~1~ Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska proposes to perforate the "A't sand with 4 SPF through-tubing guns at intervals of 6568' - 6576' and 6588' - 6628'. Expected Start Date' 1-14-84 Subsequent Work Repozted 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. -I-he space below, for Commission use OPERAT ION$ COORD I NATOR Date Conditions of Approval, if any: Approved by COMMISSIONER ,~,pproved Copy Returned By Order of the Commission Date Form 10403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate I~JPAF~.JK EI'E;I NEERI NG DATE: ~*,: D.W. Bose/Shelby J. ~&atthews ' Transmitted herewith are the fol lowing- PLEASE NOTE: BLUEL I NE SEPIA~I LM, T - TAPE, PC - PI-~PY ! ~ ALASKA, II,E;. AT'rN: SHELBY J. M~,'Fi'HB~,.~ - ATO/111 5-B P. O. BOX 100360 ~E, Al{.. 99510 ARCO Alaska, Inc. Post Office ~... 360 Anchorage, Alaska 99510 Telephone 907 277 5637 December 6, 1983 Mr. C. V. Chatterton State of Alaska Oil and Gas Conservation · 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton' Commission Attached is the notice of intention to stimulate well 1F-12. If you have any questions, please call me at 263-4527. Charles K. House Kuparuk Operations Coordinator C KH / kmc Attachment (In Triplicate) ARCO Alaska, Inc, is a subsidiary of .AilanticRichfieldCompany STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] 7. Permit No. 83-136 2. Name of Operator ARCO ALASKA, INC. 3. Address - 8. APl Number P. O. BOX 360, ANCHORAGE, ALASKA 99510 50-029-21012 4. Location of Well 9. Unit or Lease Name OTHER [] SURFACE LOCATION' 452' FNL, 514' FEL, Sec. 19, T11N, R10E, UM BOTTOMHOLE LOCATION' T11N, R10E, UM 5. Elevation in feet (indicate KB, DF, etc.) 109 ' (RKB) 12. KUPARUK RIVER UNIT 10. Well Number 1F-12 1200 FSL, 1300' FEL, Sec. 18 11. Field and Pool KUPARUK RIVER 6. Lease Designation and Serial No. KUPARUK R I VER ADL 25652; ALK 2578 POOL Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: FIELD OIL (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate ~] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) (Submit in Duplicate) [] Altering Casing [] [] Abandonment [] [] Other [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to acidize the "C" sand with a 12% HCL containing MSR-100 (mud and silt remover with iron sequestering agent) using a CTU. All lines and CTU will be pressure tested to 4000 psi. Fluid estimates are: 12% HCL; 32 bbls; nitrogen, 2000 gals.; diesel, 40 bbls. Well 1F-12 has not flowed since it was perforated, but was acidized on November 25, 1983. This stimulation was not successful due to leaving acid across the perforations for an extended period of time. Expected start date' 12/08/83 Subsequent Work RepoSed 14'1 hereb¥~Zx~~reg°~~correctt°thebest°f~[~e/~'_~.~..~ OPERATIONS COORDINATOR Signed ~/-, .... ,--/ ! ! ~(~-/~tL~ Title The space below for Commission use Date Conditions of Approval, if any: Approved by COMMISSIONER Approved Copy Returned ...... By Order of the Commission Form 10~,03 Rev.l~p~cted Start Date' Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate A~C~ Alaska, Inc. Post Office ~v^ 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 November 29, 1983 Mr. C. V. Chatterton Commi ssi oner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT- 1F-12 Dear Mr. Chatterton' Enclosed are the well completion report and gyroscopic survey for the subject well. If you have any questions, please call me at 263-4944. Sincerely, J. Gruber Associate Engineer JG: tw GRU5/L41 Enclosure ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ~ "-; ,-~-'. STATE OF ALASKA . ~'-"-- ~.~ ALASK/'. .._ANDGASCONSERVATIONC, .MISSION WELL COMPLETION OR RECOMPLETIONREPORT AND LOG 1. Status of Well Classification of Service Well OIL¥~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] · 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 83-136 / 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-21012 4. Location of well at surface 9. Unit or Lease Name 452' FNL, 514' FEL, Sec.19, T11N, R10E, UN Kuparuk River Unit At Top Producing Interval 10. Well Number 1036' FSL, 1317' FEL, Sec. 18, T11N, R10E, UM 1F-12 At'~otal Depth v/ 11. Field and Pool 1135' FSL, 1405' FEL, Sec. 18, TllN, R10E, UN ,~/'1 Kuparuk River Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Kuparuk River Oi 1 Pool 109' RKBJ ADL 25652 ALK 2578 12. Date Spudded 13. DateT.D. Reached 14. Date Comp.,Susp. orAband. I 15. Water Depth, if offshore 116. Nc. of Completions 09/19/83 09/24/83 10/29/83I N/A feet MSLI 1 17. Total Depth (MD+TVD) 18.PlugBackDepth(MD+TVD) 19. DirectionalSurvey I 20. Depth where SSSV set [ 21. Thickness of Permafrost 6840'MD,6288'TVD 6738'MD,6194'TVD YES [~ NO [] 1840 feet MD 1450' (Approx) 22. Type Electric or Other Logs Run D I L/SFL/SP/GR/Ca 1/FDC/CNL, GR/CBL/VDL/CCI, Gyro ~3. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 16" 62.5# H-40 Surf 108' 24" 175 sx CS il 9-5/8" 40.0#/36.C¢J-55 HF-EF ~/ Surf 2254' 12-1/4" 1000 sx AS ill & 250 sx AS I 7" 26.0# J-55 HF-ER; Surf '6819' 8-1/2" 600 sx Class G & 150 sx ~S I ,, 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 6434' - 6470' w/12 spf, 120° phasing 3-1/2" 6547' 6522' & 6320' (See Completioll Summary) 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. : DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/^ 27. N/A PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OILRATIO TEST PERIOD II~ Flow Tubing: casing Pressure CALCULATED ~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATEI~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. None ' . ',-; . --, 'L Form 10~407 Submit in duplicate Rev. 7-1-80 GRU5/WC06 CONTINUED ON REVERSE SIDE 29. 30.. · GEOILOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Upper Sand 6432' 5915' Base Upper Sand 6460' 5940' N/A Top Lower Sand 6555' 6026' Base Lower Sand 6678' 6138' · I I I I 1 3'1. lIST OF ATTACHMENTS Drill in§ Hi story~ Completion Summary, Gyroscopic Survey {2 copies} 32. I hereby certify that the foregoin§ is true and correct to the best of my knowled§e INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". 1F-12 DRILLING HISTORY NU 20" Hydril & diverter. Spudded well @ 1800 hrs, 09/19/83. Drld 12-1/4" hole to 2284'. Ran 57 jts 9-5/8" 40# & 36# J-55 HFERW BTC csg w/shoe @ 2254'. Cmtd 9-5/8" csg w/lO00 sx AS III & 250 sx AS I. Bumped plug w/2000 psi - fl oats held - ok. ND 20" Hydril & diverter. Performed top job. NU wellhead. NU BOPE & tstd to 3000 psi - ok. Tstd csg to 1500 psi - ok. Drld FC & cmt. Tstd csg to 1500 psi - ok. Drld FS & 10' new form. Tstd form to 12.2 ppg EMW - ok. Cont drlg 8-1/2" hole to 6840' TD as of 09/24/83. Ran logs DIL/SFL/SP/GR/Cal/FDC/CNL f/6796' to 2254'. Reamed hole to bottom. Ran 171 jts 7" 26# j-55 HFERW BTC csg w/shoe @ 6819'. Cmtd 7" csg w/600 sx class "G". Bumped plug w/2000 psi - floats held ok. ND BOPE. NU tbg spool & tstd to 3000 psi. Displ top 110' in 7" casing of brine and left hole void of fluid. NU tree. Secured well and released rig @ 0100 on 09/27/83. HILL/DH45 10/17/83 1F-12 COMPLETION SUMMARY RU Dresser-Atlas. Ran GR/CBL/VDL/CCL to 6733' - good bond. Ran Gyro. RD Dresser-Atlas. Reset master valve & tubing adapter Secured well. Accepted rig @ 1330 hrs, 10/26/83. ND tree. NU BOPE & tstd - ok. Perforated the following intervals w/12 spf, 120° phasing' 6470' - 6450' 6450' - 6434' Set FB-1 pkr @ 6522' (WLM). Ran 3-1/2" completion assembly w/tail @ 6547', pkr @ 6320', & SSSV @ 1840'. Installed BPV. ND BOPE. NU tree & tstd to 3000 psi - ok. Disp well to diesel. Set pkr. Closed SSSV. Set BPV. Secured well & released rig @ 0400 hrs, 10/29/83. GRU5/CS04' tw ' :5:h: C,".'? :' "::.,h :3 ii,:: ?i~~:!ji!',! !~ !'.::::x !? ..':.:., !,, < .:,: : '~..'/~ ~',:~ ~"+:: .... '?",' '"" ""?": ":.'~:Y~'¥. ':' "¥*:: .+~":~'",_)!!i:?~,:~:~':?,~>!i.':?',?T,?:.~?".H?: ~ ::! ,':: :'.~ ':!x',:, ~ ~':.~; ~?': :""'.'~' R I<UPARtJK '< L::: ' OCTOBER 3) 1983 JOB NUMBER AK-BO-30105 ALASKA ":~'. KELLY BUSHING ELEV. = 109.0(i) FT. ~ , ~ ...................... ~ .................... ~ .............. MEASURED VERTICAL VERTICAL INCLINATION DIRECTION SEVERITY RECTANGULAR ,COORDINATES VERTICAL DEPTH DEPTH DEPTH DEG MIN DEGREES DEG/1OO NORTH/SOUTH EAST/WEST SECTION ~~,~~R~ u?,:~? ~:~:~ :~':~:~:::9,~?~ ~¥:¥~: ~.i~¥?:~s~;~.~:~::~.~:h:::~y~:~.~:~m~.~F~¥~>:~¥:~:{~:~..::¥:~::~:m~:~i~m:~ ~:', ....... ~,, ;--: ,....,.,~,.:,,:~?>~:..>..>,,,- ....... .,,,.', ,>~<.~> m~:>~+.,~.-.,,.,. ....... .~ ....... >.~ ........................ xo:,~, .,x..,.-.> ........ ~c,.~,-,~,>,, :H,-.--~ ,~ ............ .-.-.-+..,-;., -~ ......... -~~~ ): , '.. ,, :: ':, · ', ~ , ?`~.:Dh~H~`~.~`?~?~?~:~?..~1B¥~HH~L~.i:h??H~:.:.~`:~F:F~.:..~.~?:. ",':?'~:?~': ',:~?m',?,~ :p'm~::':,~?~:m~::',:~:"~,'~?.',,:~'h'.~',m',':' ",~,::'~',~ '~:' .-- -- ...... i' '~j () 0 J i ~I~''' I ~i~':' :~:~:~ ::: I :'i:::' ~ h ~ ~ :"~:~: ~ ~' ~i':':~:~:~i~:' ::~::'::::~:::iJ~:: ::~I :: ~ :i::i:::!:~ :::! ~: ~ ~ ~ :'' It ::''~:~:~ '. 0:: l ;~ :~ ~i:l~i~:~ ~:i~: ::l~::~':i~::~i~ ~i~i~!~:~ ~ :~i~i~i~ ::~I:I: :,::I~7 , ~ ': 'i~ ~ :i:~ :~ :~ :~:~ ::2 ~,~: ~ :,: :: ~ ' ~ ' : ~'* ~ t~ : ~' ~: ~;~ii: ~ ~ i¢ ~ : ::~: ~ :~ :'~ :':~ ~{:~:~:~!~ ~':~il'~ ~;i:~i~ ~' :~" ~::~2: :: ~ ijll ~ ~ ~ II::~" ~ ::~ ':~i~:: ~::~::~ ~!~ ::~** ;~ ~: :]:'~::~*~i~!~**'l ~ :~*:i*:::' I II:~:~ :~: :i : I¢' ~ ::I; I : ~: :i~::~i~:~lJ ~::l:~i~ :':~ ::~:' ::~i~ :::'i:'~ :::'~i~:" ::;i~':~i:'~ ~: :i':~i~ :~ 3:: : : ~ ~:~ ;;:::ll~:::::~:l~:ii~,~ : i:: :':: : ~ ~::ii:: :: .:. : :~:: ~ I 3CmO 299.99 190.99 0 20 S 41.30 E O. 24 1.75 S O. 67 E -1.86 ~ 400 399.99 290 99 0 17 S ~2.19 E 0.13 2.10 S 1 09 E -2 36 j m m l I 900 899.42 790.42 S 28 N,62. 0 E 1.69 7.45 N 16.66 E -1.66 ~ 1000 ~8.84 88~.84 6 46 N 67.1~, E 1.41 11.~7 N 26.31 E -2'.44 :~i~:~::~ ~l~[~: ' : :~;~:[:'~]l L '~:'': :l ~ ::~ ~:. 'l 'l~ ':' ''' :' ':::~' ~ ~ ~ :: ~ ~[: : [ ~::l ~ l. : ~ ~ '~ '~'' '' l:' :~. '~ * , ] [ ~ ............ [::{::[::: ~:~*~ ~ :~'~:: :: '~ [~:' l'~ ~:.':'::: I '*; ;:]:: : ' ............. :::::::::::::::::::::::::::::::::: ........ ' : ] :::'~ '~: "~¢ [~ ~ ~: : ~:~:: :~' '7 ~' ~l ~ ~::' ~ [' [ ~: ~:[~[~ ~ ~ ~ ~ ~: ~:~ ': ~ ::::::~:::~]::::[' ~ [ ~ ~ ~ [:[:~*~::~ ~Ol ~ ' ::!. 7:[:1:;[[: H '~:::: :~:*~::[*~: ~::~:~:~::::~"~[::'[[[~':::~{~:~,[ ~ [ 0 : :': E 1.: :''' ::. :':':' '' '; : ~:::,'~:': ::~:~::l m ~' :, 1500 1494.83 1385.83 7 34 N 85.80 E O. 3~ 25.72 N 87.49 E -20 . 40 ~ , ~ 1600 1593.87 1484.87 8 16 S 89.89 E 0.92 26.19 N 101.27 E -26.73 ·. -~ ~ .':: . · ': · '::: :.:¥~,..: .:: .~ '.:: :::':',:u,:....,~':'.L:4 ;,: :. ~ · .: .:.: :~;.::. , . ,...,.::. :: .... .... ,.:.:::~:-::;.. :::;:~:: .:::.::....: .~.:.,::~ ,:, :., ===================================================== ...:. :., ...... (:: :.,.:,...:;.:.,;:.:x~:;:;:..~:::¥:;:;:k:,;:...,......,>.~ .:,, ~.::,. :..,.. x,..:..:..: :...: ,...:.. : . : ... .. . . ...... ~ > .... ~ ~ ........................... ~,., ................... , ........... >, ......... ~ ......... . .............. ~ '~ .... ................... ~ ~ .... :---,..-:- ~ =======================================., a ~ ~'::.:;:,,,'~ .,;.:'.,,,;:,.:::;;.'.;::;::%:. T ~':':~z;;;7 ~ :~..: ,;::~.:..:~::: "~ ~ ~ :~?~': ~.:`L)?~::.¥Z:~:~:~$~::~:~:~?:~`::~:~:L~::~:~?/;~:~::~:::.x~;?~.~` ~j::;:::'~ ~;'. '~ i~:::~::,:~:~:~;:~:~?E),:' ~::'~.~ .':'~ ... ~ .: ~ :,..~: ,::'.' ~ ~ :'... ~ ~..~.~ ~ 2100 2090.08 1981.08 5 45 N 7~. 89 E 0.87 26.19 N 161.63 I E -56.27 ~ 2200 '-~189 55 2080.55 6 7 N 74 39 E 0 4~ '~,~' ~ ..... ~o.7~ N 171.64 E -58.93 . ·' _. ..... ~:, ~:~'~'~., :~'~:,~b::' ~ ~ ~..,.., ~ w 7~', :~::~:::~.:~::,~,.c" :~. - :;~:~c ,-'-"~ ' ' ~ ~ ..... ~-,-. ~-.x~ .... ~,, ' - -. -.- -~.-~.~.--- --.-' ......... ' ........ ~-~'-'x'~'-' "-'~ ..................... · ..... u..~ ........ ~ -- - _ ~'- :.... ~:~ .~: ~ .:.. ~ ~ ?:..:.~:?~....~, ~ ... ~. ~. ~ ....... ?~ ,.:- .:.:.:..?:.::.. f;::: ~:;:~j:::~:.:.~:::::>~.~::,'~:.': .~ ~..~:::~:~.:.~..:~:~.f~:~:~:~:~`:::~:~:~:~:~:~~:~ ~:~.?:: ~.~::~:::~::~:~::~,~:~.~?~ ~.:..: ~:: .:.,. ?.:: ,:.,..-:f~::.:-::: .~.::..~ ~ ~ · ~ . .- · ~ ~ ~ · .,., . ....... ~ .,..,-...,.. · ·. .,., · ..B...-, ............................. ,m...-.~...~,,..~ ,.,+,~ ............... · .-,,.. ........ ..+,~.., .x, +...,..,... ,...., . ......... · .. .. ., ........ , .... 2700 268~. 99 2577.99 4 41 N 77.80 E O. 69 43.81 N 219.60 E -69.28 2800 2786. ~7 2677.67 ~ 2~ N 74, 39 E O. 37 45.72 N 227.32 E -71.40 ,. · ¥:, .-.. :.=.'...:. :- :~' '> . : ...... ' :'.:." :"~ ~¥~:.s~%~:~:~::~:4::?~r.:~::: ,~: ~,:~z:.~:r.?,';z..L. ':~?:z'~:~:'.;:':~::::'.'~ ~:~:~P:;:::~:~H~:~ :?.~,~j~>~: Y~::~ :~ :~:~;s~'. ~ ~,, '~:z':~ .:.~: ..~: ~:.~:~:~i:~:~i~:~:~:~:::~;~::'~'i,::::~...::~.~.:'~ :.:!'?,-~ ' .:~ 'J:.. ':5:: ' - .:~" :. 0 0 0 .~.. ....... ~ . : : ~':q.: '::..~'.~r ~ ........ ~..~' ~.u~' u:u.~..,.u~'~~'~.. :.r<U.N., ~.,.~ ~fi~!~. ~: ,~.~'.~'.~:~,'.~:~ ~.?.c:n~c~uu.:..~u~u:~:.~r~u~..u ~u :.~u~: u'~? ...... ~1~ m...~ . J KUPARUK OCTOBER 3, 1983 dOB NUMBER AK-BO-30105 J_. ALASKA , ' , KELLY BUSHING ELEV. = 109.00 FT. i ~ ~ ' 8~,~~ .......... ~~ ................8~B~8~ .............................. :'"'"G~:~ ....................... : ...................................................................... TOT'~'~' ~ MEASURED VERTICAL VERTICAL INCLINATION DIREGTION SEVERITY RECTANGULAR COORDINATES 'VERTICAL J DEPTH . DEPTH DEPTH DEG MIN DEGREES DEG/100 NORTH/SOUTH EAST/WEST SECTION ,T,,,_-9 . ..,~m ' ::! :":] '" ?~';.!i.'.:] :: :!"?r: '.: ..~ - ~... :::% ..... ~.~:!! :!~!i ::::?ili:i!':: 3050 3035.36 2926.36 8 7 N 21.80 W 3100 3084.69 2975.69 10 36 N 26·10' W -....__~ ._ ~.~ ...... .~:~:~,:.:>,.,..:::, ..... . .......... .<.:.~ ...... ~ ........ . ........::. ...... ........... .,. ...................................... ,..:. ............. ~ ........ . :,i:ii~j~i?:iM~:..':iiiii!l !:i ,::i.' . ':;~ :::::::~:i:i::::::: : :'&fl',;:::;" · ::;: '. ========================== .... ::;;;,:::' ¢,: ..... ;;::.,.: :.:';.:.::;;,:;:, ', ;~ ' ::::::: :::::::::::::::::::::: ,,:,:,:, ., :.:,:,:.:,:,;:...:+::.:,:.:,,,..,:,:,: ,, ~,,,,.., ,.. ,,, ..,::: ;,.,,,;.;...:+;:.,;..., ,,,,,,. ,,..ru;:,, ,' ":,, ";:,;,;:;, :.:; .,,'. :;,:':x ';; ....... ,., .,.~..,..t.,.: ....... :.::,, ,, ',:::;~.:~:;.;::::;::;::,: , 'r::::~ ;~.:, :;~;:,;:,r.:.:.:.:.::.:.:.:.:,::~:,, ...... ::,: ,:' :.:.,,: 'u:,: >':' .,.: , .~ i~ ~ :3600 355~, 83 3447.8~ 2~ 2 N 37.89 W 2.01 202.2:3 N 131 . 11 E 112.1~ ~ 3700 3~4~.~8 3~37.~8 27 0 N 37.~9 W 1.99 237.02 N 104.38 E 155.59 ..... ~ I i ~ ............. ~ .... ~ ~ i~ i ~ ~ ~ ...... ] :' :' :: :'400~:': ':'~ ~'~;~ ....... "~¢ ~ .... 7~~ ............ ~:;~!~ ~.:~x~'~ ~: .............. ~:?~':':..~:,~,?x.::,~ ~:.'... ............... ~:~:..:'.:~':.'.. ?~?'.;~:~;~?~,~?.~m,<.,.::*~-,~,~?~:~.,~, .............. ~:m?:....r:?~x~ ~:~?;~i~.~~:~.?*.~.~.;~.?x~?.~.~?~;~::~..~.~ ..:: -:, ....... =:. ,.:,:,,'.:.:.:.~',~ ~':.:?::,.:~.'.z.:,::,:.:~.:.'~:~.:::.~:.:~: ~'~:~:~;:~::~::::~:'~:~:::?~:::~ :~:::~:~:~:~:~:~:.~e~:~:~h~=~:;:~a:p~:?~; i.~:~.~:~a:~:~:~:~;~`~:~y~r~.~:R~i~J3:~.~:~.i~:~y~:~;~;~:~`.¢~:~~?~:~1~f~:~f:~y~: ....................... ~..:~.:.:.:.:.:;::::::::~:.:;~:~:N'?:':'::F'":' h~:?::~,>q?:'.~;:;?~:::::9:'?::: :.:::.:'~?,::::'''''~'' ' '~ :' ': .:~ :' 4200 4072.51 39~3.51 35 55 N'3~.~O W 2.00 446.57 N 51.31 W 414.54 4300 4152.~8 4043.~8 37 28 N 3~.~9 W 1.54 494.52 N 8~.98 W 473.80 . · , ..... .x ........ ::: :.:: ~ ¥ ::.':E:::~¢'3b:.::~ ': : ::::.' ..:. +'...' ',.: :: ¥-: :,,x,.:: :,:: :::::~':~ ~:':~:: ~:~%~?BL::: :.:..,., ~ :~:)::~:::~::: .,....r ~.::::.. ::: "::::'L '?. ~ ~.:.:~:: ~ [,. ~., ...:.-...,. ':?. ~:,:~:?~;~:~:~:~ ~,:~ ~ ~ ,~ ~.:~:~:~:~:~:~?:'~:~:?,~:.~:::~:~:~ ~' ~' ~ ~:, :. I~ ::~,~ ~?¢~[~.~:': x .~..~:~'.~'~. ~ ::~f, ~. ~':. ,: ~. ". <" .'F ": J: ~ ~ ~ n · ~ ~..,.~ = ~ ~ - ---' ~.~ ~;~ ; ~ ~.~' ~ ..... ' ....... ':u.~ ............ " ....... ~ ................ ::::'":"' 'i' ~""'~':":':':"~:~: ................. : ........................ ':' ............................. :::::::::::::::::::::::::::::::: .............................. : ............ :'.~:~:.?:::~L'?;~.~?.,::~?':::.:~:L~f:~?:.;~??::~:~::~.="~?:~:~. ~':::::':. ':;.5:.:...'.. ~ "~ ~ ~,,~ ~o. ~ ~o~. ~,' ..............o7 ............. 2~"' .......... ....... N"'~', :"'~G'~':':~'''''*~ .................................. 0'::::2'~ ................ ~ ................... ~:'B'8~': ~', 'z~;/:SW ................. /16 ~, 4800 4548.52 4439.52 ~7 5 N 37.50 ~ 0.30 737.94 N 271.47 ~ 77~.38 4900 4~28. ~4 4519. ~4 37 0 N 37.19 ~ O. 20 785.83 N $08.02 ~ 83~.. 03 ' . : · .,,,,, -, ,-..:: ::,x.:..+:..,.+:.:.... . , ::., .:... :.,....: .:. ::::::::::::::::::::::::::::::::::::::::: .::,:: :~::.,.,,>. ,.~, :.::~ .::: ~ · ,:,+ .~.::: :..,, ...... ~-:..:.,.,: .::.,..::.:~. : ~ :¢~:~y~:~?, '..r;~y:. ......... ~¢~::~::~¢~:~:~¥~. ~'.: ............... ::.f.{~. :'.,.?': ~ 5 oo : ............... :.. ...... <.:., .....o- .. ·. '~' . "':' ':..':,.'. ,'-: ....... .... . ........................................................ '. :":'::~*~:'*~::~:~:***~*'~ .............. :" .... ~:'~:~:"~::~ ...... ~'~' :':' L?~::>.~:,~x~;~:~?~.~:.~:.~::~.~:<:~.H...,:::<.:~ ::?::::%-!Ol~, 7~. ~,~,~,,,:,L: ..... ~,%.'L:: ~./.~:::L,~:::~:L;::~;~.~:..: ~ ~ `~`~.?%~`~:~:~:~:~:~B~:~`~.~:~:~:~:~:~.~.~:k:~:~i~:~:~`:`~L~.~:~L~:R~:~:i::':''~Z~..`.:.::::~.~ ~-:~:~:~.~X~::~::~ :~:~:~h:::~:]~:::~:~:~::~:~P?44~;~:~:;:~:~.~ ,~':~:::~::~. ~:.::; i:':;:::~:~:~:::~::b::~;::::;::::::~' ~':~::¢:::~::~__~: :.':i' ======================= :~ :..:: ::~ ' ~ ~ ~ ,' .' :.~ ~,: ' 5400 5031.00 4922.00 35 49 N 38. 0 W. 0.30 1020.42 N 489.19 W 1129.27 5500 5112.55 5003.55 34 53 , N 38,30 W 0.9~ 10~5.93 N 524.93 W 118~.45 ~ , :~:.,,,:: :....,. :: ~60~ .':::u:.~!'z~::~,:::~:,~::~ ...... ~,":~,:~::~' ~:~,: ~~X~T~::? '~:'"~ ' ~:~ :~i~~' :?~ ........ ~:,.~ ,: .--~ ..... ~ ~. ~a~ ~:~ .................. i-,-~ ..... ~-, ' ' '.'.';'. ?:: ?? ?.L:::}].}?i::??~a'::t.':P~:~ .... :::'. : ' '.. "': ..... , ..... , ........ , '"'"'"": ':':' ",'" ' ' "::" :'::'"" :.' ' "~ ,' ""':' ,'"" ,:"?,':: "':T¢~:ih.:~!F:'" ~:..: ' :'::. ":~'i~'u::';.~::!:::PE?!;F::.~::',:'~:?k>:?::'"::::¢~: .:.u.:~:; ! ',:': ':,:" :' ;::'":":'' '::: !.:',~ '"',:? ::' :'..' :::'" ': '."' , KUPARUK ALASKA MEASURED VERTICAL DEPTH DEPTH O. OCTOBER 3, 1983 !'; ':':" :':'.~ :c~:..:: , i:~::.::¥:.~:, ........ :~.ii ~::~:?~:.' ::':,~.: .: JOB NUMBER AK-BO-30 KELLY BLI~HING ELEV. VERTICAL INCLINATION DIRECTION SEVERITY RECTANGULAR COORDINATES DEPTH DEG MIN DEGREES DEG/IO0 NORTH/SOUTH EAST/WEST VERT I [:AL SEC:T I ON . ::: '-'~:~..: '.'~.::::..::.~?:::::: ~:::',~ ~ii.~! :iii:: '~.. i :~ .... :: .............. : ...... ' : ........ .,,' : '~: '' 6000 5533.91 5424.91 30 33 N 35.89 W O. 94 1279.77 N 688.08 W 1452.78 6100 5620.47 5511.47 29 31 N,34.50 W 1.24 1320.66 N 716.'~4 W 1502.57 ,~ · :: :. :'", ' :::::',::::~ :'.'~::, ~ ' : ; :,: ~ . : :: .~;. .x::: : 660,(i 6066.63 5~57.63 24 ~ N 32.19 W t 6663 6124.36 6015.36 23 5 . N 32.3.0 W : .::: '. '::~:~'::: :': : :,,::-:.:::?:,:" ..... :~': .:.' ':'": :x...:.~ ::::. ?-" "-," ,;, .'"',:~. :: :,.: . :::.:.:::~:: :'" ~:~:.::~'"'.:,:..:'~:,',.:x' : :, ;? "-':~" :" ::::::::::::::::::::::::::::::::::::::: :~'"J:? :~"?: f': ~' ' ' :.'::::?~:~.:.':!~ "t ~':'" 7'::.i~'":"""?:%;~::~::~::~?Y.~'.?::':':' ..'. ~::'~!::..: ..... .:'~:.(~::?::~gi~:.?~':?.i:~:'":':':::~i?~:~""' "~:::'::~??~:~::' ":'::'~'"':: '~: :':':" ....... ~':~::"" ::::,~::.~'~':::~::~'.~:: 1.3~ 1508.04 N 841.~7 W 1727.16 1.62 152~.37 N 855.42 W 1752.35 ' HORIZONTAL DISPLACEMENT = 1820.39 FEET AT NORTH 29 DEG. 18 MIN. WEST AT MD = 6840 © 0 , ,.,,.:,.,: .,.,,.,,:'...,. ,.,,, ,:, ,,,~, , ::,x, ...... ,., ....... x.::..~::;~x,:,.~,,,..: ,;,,. :, '.....;: .; ,,,;',:'...: ,, ,,., ~,, ' : ;,.',',' ',: ~.., ...... "'. .:,' ',~ ~' . :J, :,::::..,.:: ..:,.::,..,.; m'. ;:,::;::::::;'::::::,.,.:::,.;?: '.~, ',::., , '.;, ,; ::;:,~:,.::::~:.,.:.,'.~.:m:;,:;v',::; ~;.:, ::A : :::.. : ';, , . ,' :,, ~~ ~ ' - - ~ - .- , K-BU- -,010 ~ · :1' I.: OL:TuBER ~, 19~ JOB NUMBER A ~ · ~ ~_~ F ~Rb ~. FELLY BUSH [ NO ELEV. = t 09. O0 FT. ALASKA · ' ' ' ................. ~ .................. .~,~.,.~,~.~~~~~~?'?' ..... ~'~.:'~'~"'-~ ~?..,¥~,...,~...~??~...~:~ ? ...... :~ h'::,::'?.~.,?.:,:;,~.?.~..~.~.:~.: ,..,~..~?~";~";'..i..~..",~,~./,~,~..',~:~:~.,, ~.,~,.~,..~ ','?..,::'~ ::,.~.,~' ~i C~?..'~,'.....i~:'..',Ci~..~ ~ ~.',.i....~.,,?.'.~ ~:.....:~ .... "...../?.~.,,~ ',,., ~ .~=~,.,. ,. '~.;~'.'i.'.~.,, ,/,i~..??,.~.,"'~,. ~ ~ :~.~'.,.' .':...:.:' ~...,' .i~,~::~ .'~ ~ ,i'.i,,~'. ...~ .~i ."~,'.i:",:','~',..i .:.. ~ TRUE SUB-SEA TOTAL MEASUSED VE~T I CAL VERT I CAL ~ECTANGULAR COOED I NATE~ MD-TVD VE~T I CAL ' . ' ".. :'? :'~ ".':' .?. ~'.'.~':.??,?:~',?.".~.???;.~??.'il, ? ',?.?' ::?~?~i,~.;.i:.~:'.;~:~ ~'?"~'?'.i~?/.i~?~',~'~?.~.::~i~:~?'*~ ,~.~i ' :'~' .~i~'.~i ~'.' ?' ??'~.',??"~;?'. :'~?"'.~'"?? ~ ~'?''~,' ~!:'.~../.'?~i'..",:.~..:,,~?',?,?'..217. ?~'???.:'?~'"~'.'. :., ~:'' . .~ ~ . I 2000 1~0.55 1881.55 24.6S N 152. O~ E ~. 45 8.2~ 3000 2985.79 2876.79 61. O0 N 232.74 E ~'? ~:'~!d:i~!'.:.,'!!',;,,:.i';~:~:~:~ii~!!ii'.~:~?:?~;;~ ~',~:~:~".'~'~:~ ................................................................... 14.21 4.76 ,- -- ,a .~ _____ "11~ ~.~.'~.. ...;;,.=_ ~ ........... ,..~.!V..~.,,,,~.'~:~~~'~ ..... 33'2'~"2~ ....................................................... ~'~. · · I THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD. · ~ . ~ ~ - .... ~ ...... ~..~.-.o.,..~...:~.-.-.:~~.~:~'~~'~"~" . .:'.:?:: ...: :. : . . ' . :' :' '.~ ..... :.,:.',:.::.:,x::.:.:'~:':,,:: :.~ .... '.:.:..:.. :: ..:.,: ':: ,... .......... x,,.x::~:.:~::.:~,~.....:......::.:,:.:.:.,.:.:,::.~:.:;f,~:~,,~ ..,....,:..:.:.:.:.::.:+::..::::...:~........ :.:..:.:.x.:.:+:,:.:':::::.:.::'.~:.~, ~.,:.~..:.:+.,:.:,::~.. :'.,...,...~.:,:.:.'.:.x.:.'.:.:.::.:~.:.: ............. ::.:.,..:.:~.:.',~:::::: :,.. :..: :,...:.:.:.::m::'.::..:.....:~.....:..:,:.:,:.:.:,:.:::::::.'......,.. :.:..,.,:...'.:.: :: ::: . ...:.: :... : .... ::::::::::::::::::::::::::::::::::::::::: ?::.:. :::. :.::, ..:. ~:~.~.~:~:~:~:~:~:~:~.~:~:~::~::::~:~::~:~:~:~:~..:~.:::::~s:::::::~:~:::~:.~.~:~;~:~.~:~:~:~::..~:::~:::~:~..~:~:~:~:~:..:~:~:~..~:~:~:~:~:~:~:~:~:~::~:~:~:~:~:~.~.~:~:~:::~:~:~:~.~:~:~:~:~:~:~:~:~.~::~:: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: :::~:,.::::.:... :,:.:,,..:.: ................. :.:.:.:.:.:...?,. ................................................................................... - ~':~::..:,¥:.:.. ': .: ': ' '. : .' .' ::::::::::::::::::::::::::::::::::::: ¥~:?~::::~ :,.:::::.~.:.:.:... ::- .: · ::'-: ::".:.'~....:::m'::~' ::-:: ~:.'::::~:::::::::::.:..::~:~.:~:~:::~'~:::Y:~, :::':..~ :...::::: ::':;..."::. :::::.~:> :...... ::::::' :::.::..::~::.~..x~-:.::¥~::'::::.::~ ::::::::::::::::::::::::::::::::::::::::::.::::'.::.':.::,:: .:.-: :': ...?.::::',::::.. ~..~:: .::-::x::::.~::::::::.::..:.:::.:..::.:.:.:..::::. ::..::::..::::..: . ..: ...':.....'..' ,'::: .- ": .?' · ' .'. . :.:' :~.?,::~::.??:::?..~:~:,'.'::::::.::.:':::.' :..:~ ~:~.~:.: :?::,.. :....:..-.'. .,:. ·. ': :' '. :.:. :.::::::?:~:.?:~::::.~:~:::~:.~::~:~:::':::;:~ :?::.~:~:~.::::~:.~::: ';.:; :::::~:::.~:::..-' ,:.: :.:.'..:::~..:::.:...:.: :::::::.:::..::::.::::':~,.:~;::~:~:x~.::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::::::.:::::>(:~::':~.':-: :.'":~d': ::.':.: :::::':::..:.::::::.:::::::::.~::::~:::~:::::~:.:::::.'~:'~ :b::":::.:--?'~::.:: ::? :':'::::~x~ -:::'..: .'~ ...'.' . ~ : .:" :. '. ..... : ' . '.' ~:.~.~:~.?~:~::~::~:~;?:~::~:~::~.~:~:U~.~.: "::::~:':~::'?::~ ?~...>:~:~.~.:.:~.:::::::.~.:..::~:::.:.:.~.~.::~:::~:~:.:.:..~::~.?:..~``:.:.:...:.~.:.:~:.~.:.:.::::..~`.~.~:~:..:.. '" '""' '"' '" '"'": '""' :"': ': .......... '"" .................................. 0 0 0 KUPARUK OCTOBER 3. 1983 dOB NUMBER AK-Bt ,05 ALA~C:KA KELLY BU~HINO ELEV. = 1[)9.£)0 FT. :':~:~ :"':~ ':: ': ': :: ::'F :'.-':." L': .:~ hh ~ ~h~ ?L~H~'~L~i~J~i:H~?''u'x?''''''''x ..u ....... ~'.um?'..'. ''. ....... ~u:~ ~,'.'~' ~:.'~?~.. '~'""~H.:F"' · ...... ..r....:~:,,..:........, u ...?: .?.~,~.¥.:x'.::~:N: ........ ?"~'rrH~:?':'" ~ ~ HH?;":':'~' 'x"'~riqH.r' 'x'x'"~::':%~i?:':'~'- ': '"::?" {:H:h.!LhdF..rqi.:l~:~. ~ ~'. ::".u'. :.~ "r'~r::~m: .:r '~: ih:~ ":~r:..: ?m'. u. ' TRUE SUB-SEA ~ TOTAL. ~ MEASURED VERT I CAL VERT I CAL REL~TANGULAR COORD I NATES '~ ' .~ ~'' ~ ';::'~: ~: ';~ ~; ............ ~ '' '~; ' ~ '~?i:: ~'¢~:~'~ ;; ..... ~' ;~ ~ ........... :~'~ ......... ~ ~ : ~ ........ ~'~' :' ~ ' ' ~ ~:, ::: ;': ,, ~: ~' ''"'~': ~ ] ~:~ ............................................ ~0~ ~0~,00 100.00 1,1~ S 0.~ E 0.00 0.00 ~ :30~ ~0~. O0 200. O0 X, 79 ~ O, 71 ~ O. 01 O. O0 . . .~40~~~~ ' ' ~ ...... ' ~ '~ ~ ' ~ ~ "' ~' '" ~" :'.' .:~.:::.::..:r::?'::. . . '... :.'..J.;.'r;?;'..'::.::~::::r~.~:.:~¢::r~::.::: ;'.' ' :..r"~':' ..'.r?:.'::rjj.;..j:::::.~r:;:.r ..x; ';ri: .~r:r:;J~:?.:m.r;:::r.::;:;u::~;u:;' :;".:.'" ';' :;;:;r::mrr~::;'::r:'..': ;::r.r:.::'::rjm~;:;':: :'"' ." ':;1:.~::;;..'..'..':' ~:;~;';:; "".:."....':::...::: ... . .' ~ · ~ ' ~ : ~: ': ?F'~. '~' ~~:~"~':::::"'~" ?:~ :'!.~:.' ..::b".:.::::.::!:~::::~: ::x::~u:'..:'.:~:~ :~:~: :::']F, qc:'%~::':.. "~p..!~:{:'.:::.r:r::~'.:: ::'.::::M:::'.?.:'.r~H::'~j.:.~::r:~::.':... ~:::B~?~::.;B~::~H:h:~:~::~:~:~::{~:::~r~::::~?4~:?':~:'.::¥'p:F¥:j~:::::::::::~:~n::~:~'.'~ :..: ..'.!.:.~% ~:'.~!:~: .. H:".:':::"::::?.:;:?".~:?.~::~:'?~ :'??. ;r::?:+: '.]:j:?;¥ :: : .:.::.:.:] . .: ~i' ' ' :':: '~'' :'::q::~:~:"~?~::::~O~'i~::~??,..:~uu ~u~:~:~u~?'?..:','*.'..~?:,:d'..:',.,:u,,::,.~n,~n::uu:~n~u~uuq::~ ~:~ :::,.,~: ........... ~::~:~u.: ~:,:,::..~,~::.':u:?~n~:~:~ ~m::~:~:~:' ..:~ ~::i~:~ ~ ~?n ~ ;~j ...... ~ :,,, :~ i :~: ~ :~?.:: :' ~ ........... ~: : ~: i:: ,.~ ,. : : :: :u:'.: :~ :: : ..;: ,~::..,~,:~:..:...::~:.:,:~00, ~0.... ......... ~::..:~::.:..~::::~.:..~:~::~:::~.,.~6:::..~.~..:,~:.~:.? :.::...:::~ ........... ::::::::::::::::::::::::::::::::::::: ............. ~:,:~..::.:~:~:~.~ ............................ . .......... ~:::.: .............. ~:~.~ .......... ~.~ ............... .?.:..:~.:::::~:: :: ..~.. :? ..... . :. j~! .r ~ ~llr II ~!~! ~1 , VI ~IV ~11 ~ I~ ~1 ~ ~ ~tl ViF ~!1 V~ ' 80~ 80~. O0 700. O0 , 3.6,7 N 10. 19 E O. 26 O. 17 ~0~ ~0~, O0 800. O0 7.88 N ,17.47 E O. 63 O, c.~.~e .- , ., ~ , , , ... ~i[~:,:~E::~ ~. ~::: '.~: : ~: ~ ~ ~ :l 2.~27[~:[~ ~,~i': :":'¥:?~:[?.~:~i::~:::~:%~::~: ~ .~.;~ ~,:;.'~: ::.;~[;~ .... 2?::..j:j~.:~:?:::::.f~i[~[:i:~.[?.l~?~l[f:'?~ ~. l ~:i :'.:sz:~?~:x~:l!ifL~[:[~:f!~!~L~z~[~:~i::~.:i~::?:~l:;:f?-~ ~::::~:~::~:~1~[~:~::~;~:~::~::~::~:1~::~:~fff~:::~].~i:~..~:~;t:[~f:~::~i~::~i~i`z:.~.z:.::~L:::~:.~:::~:f~[.:~f~[~:~::[~;::~::ff~:-:[~f::~.~:2~f~.~:.::~:~f:~:-:~t::~i[.~:i~i~;~:;~:~j~:~:::f-.~.::.-~: 141:3 1409. O0 1 ~00. O0 24.66 N 76, O~ E 4.40 O. 89 1514 1509. O0 1400. O0 25.86 N 89.37 E . 5.29 O. 89 · ~~I~ ~,~ ~,~ ~ ~=n~c .... ~ ~ ~, . ~ ..... ~ . , :.':' . i 8 ! 7 .' '~80~; 0~':??'::":?~:::~:" :i 700; O0 '::?:: :"?':?::~"~;~:~?~;:'68 '"" N ..... :: ': ' ";~:'~ :' ' i ''':'~ ..... .:'? "~,:.::x:f.~?,~i~;~:~':.?:~:~:~?.~':~'~:.~::f' ':: F'ARUK'~'~-~~*"~ n,v~, OCTOBER 3, 1983 dOB NUMBER AK-BO-30105 .ASKA ' ~.~ ~.~~KELLY BUSHING ELEV. = 109.00 FT. , '""*~'~":'"'-' '.' ~:~:~:~:~;~:~;~:::~?:~:~::~:~:~:~``~::::~;~M:~`~::~?~::~:~: x,:; ,,:; ,;.7;,': ':,, '::..'? ':: :;::,;? :'?: :':'::~'.. . .L p:?q~,:;:;':: ::':'::::,' '::: ' ].'.: '. ,: /";':~:":,;: ,.,:':,:L:';:?::~:? ,,:. :~::;', : ,;,", :, .' ,:',.?' ~:,~' TRUE SUB-SEA TOTAL IEASURED VERT I CAL VERT I CAL RECTANGULAR COORD I NATES MD3TVD VERTICAL , ~, .... ~018 211 ~ 2109. O0 2000. O0 2&. &2 N 1 &3.48 E 10, 0 2219 ~'-'"nQ,. O0 21 O0 . O0 2~. 32 N 173. &5 E 10.57 0. : ~ ..:~.t;:,::~:,, : ~ .... :.:r~:fl;:~?~::<::::::* ?.:]~[,:..7, ;:~:: .... :~j~i h]~:~i':~:':~ ~t ::H,~ ~ , : :~ :[~,{:~:ih:{'t~::::::'!~i!~i]iji~[iid[~,>' ,~';?' ~H:~,i]?'H~;:::'::::,:::~:::!:j~:.'.~J';[;.[; ~:.:::::':.~ ~ii::!i::~'.H~:~,i;;::~7);~:J~:~H:~:[;' :'!H::!:;:::][2:~:;:~ ~':'' ;': · '. .: ....... ,:~' ~": ::'?;';::::~;::":~:~:::: ~, ~. .~,~.':' ~:'i,:,<,?::i?i:i~:k~¥:~:r~:~::::'~'~:::::<~:'.': '~ a:'-':':':e:':'x:~'..?.:---"-'~"-a ~"""~ ............... 2722 270~. O0 2&O0. O0 44.19 N 221,3& E 13.08 0 2~:22 280~. O0 2700. O0 46.23 N 228~ 96 E 13.39 O. 31 ~';".':'.-'"':-?'-~'~ ~'~: W'~.:¥~t;i(3~::~B;ff::;~'~ W:'~ : ::":: :":?$:;:i::::;:,7:':~.~: $~ ::~ ~ ".,:' ~ '( :.i.:t ':~.";~ ?: ";'i"::F~':~ :~;.,. :.::?'::"[:~:[:~:tii?::.~',u3::::~ ~?'~:~%1;~:'~:~:t:: :;h~:.:': :'t~'~:':~'i'::~'??¢cJ'}]~i?::~:!~l::i::'J;t;~:?":: ]}:b" :'' : =============================::::::::::::::::::::::::::::: :. :::~:.:.:., :::::?:.:::::::':;:,, . ..:::::::::,~ ================================================ :::::::'::.::,::..;:.: ..:,,:,:., ..::.::. :... :~,, :, :......_...,.::,..... .... , ::.:,, ;',' .: - ~-~.~ ....: ================================== .... "~':;::::':::: .... ':' ........................... ~'~';'57'-'" N .................. 2 i 2; 7~ ~ , o. ~ · ~. ~ v : 33:32 330~. O0 3200. O0 123.23 N 195.01 E 23. O0 4.53 34:38 3409.00 3300.00 1~1.~7 N 171.48 E 2~.__~ ~..70 6. ~&57 360~.00 -::. ::. 3500.00:' :,,: :.::.:::::~. ':: ~{ ,7~ N :...: '.:.'.:~::~ I~,.-~'?~.:~:~:~:::~t::.:::::~:~:::::' :~:~:;:':~ . 7::'::" :.~ ·' :',' '" .- :'.:' ' "::: ====?2=====:=====: ' ~' ': :'""" ,. ::.h':?':".:":::::'.:::::::' ~~" ." '-:" ...... ~ :7 :..:-.?::: :::.~a ~ ~1 1" ::: ,:' ..: :': ::::::::::::::::?:::?::::::::::::::? ":: .::':::::~: © 0 ~~~'.,'~... ~i.' .~.~.~:!:i::'~!:~i!i ~:::~:i:~:~.!~:~?i;!~i~:i:?,i:i:~'!a':~ :il. m:i ~.:~i:!i.~!;!:!:~:i.~:i::.`~.?:!:~:~i:~.i:!:!:!:!:i:!:~:~!:~:i~!:~:!:`.:~:D`.~!~!:!~!:!~.~:~!¥i;~.~i:~::~:`~:;!%.`:~:i:~.;~` .~. t~ - ~ . .... ' ~::~::'::~?~ ==================================================================================================================================================================================================== ?x'::': :¥:~: x:.~x::? ,~ KUPARLIK OCTOBERo,~' 1983 ALASKA ~~~,... >,.,,-:,: ..... ~.~,~...,~,%:%~-, ~.,.~,~L,-.. /,~q~:~,: ..... ~ ,:'~.~,:,~.,,~..-..,,,(~.,,..',,~.~.~6..~,..,~.~,, .~.~ .'~..(..,,..~.,,..~ ~. '...'.,s '.,..,~~?',:.:S,,:,.~ ;.~:~:,X,..~, ~,~-. , ',~,,-.~,,,.,~,:~....~-~,..(,:~.~..', TRUE SUB-SEA TOTAL- dOB NUMBER AK-BO-30105 KELLY BUSHING ELEV. = 109.00 FT. ?i:?!~i:::i.:;:.?:: .i.i,:::'~:: :"'.",', , :" ':;' ': ":''''~'''' '~"" ':J:' ' '" "" """'"'"' ........... MEASURED VERT I CAL VERT I CAL RECTANGULAR COORD I NATES MD-TVD VERT I CAL j 4122 4009.00 3900. O0 410. 63 N 24.51 W 113.25 19.~ 68 J 4245 4109.00 4000. O0 467.87 N 67.13 W 136.12 ~.'~' '87 ',' :. , , :., , ,:::..,~ ,.,~: ..';:, ,::: ,.;;:~;,.t:::~ :. ,. ~.:;.~m.,...;~ :,:.;:;~::;::~:.,.,.:,~:,. :~ . '::,,~ ,::~ ~ .:..::::,,~ ::..;:;:.: ,,. ,::,,,,.., · [ 4875 4609,00 4500,00 774,22 N 299,2~ N 26~,79 25,35 ~ 5000 4709, O0 4600, O0 8~3, 85 N 3.44 74 N 29~ 80 25, 02 ..: ,: . ~ _ ." : '. ,. ~, m.~:..::f~,. ~ '~ .., . ::::::::::::::::::::: :?, ..: .,.. ,....-.'.'.: ::.,,,. ,..~::: .... ..,t. :.~ ..,:::. , .,,. :. :.. .... ,,: ~ ,::.:: :: ,: .:;: . ::,,~ ,::.~ ,:.,.::.,:. ,. ?::~:.,. :.:: ..:..:,: :,.:, . :: :: ,,. ..... ::,:...~, ::.: .,: .: .,..::. · , .. ~ ., ....... . ...~ ~ ) ' . .: ,...,.., , , ,, ,.. ,...,...,... ., . .. ...... ....... ...... ~ , . . .,.,: . ,. . . . ~ · , .... : , , ,. . ':':":~:? :.-: :":~:'? ('::' ~ ,~ . ,~. ~/' T" ':~ .... '~" "'. '~;:.' ' :'"'".~?~..~?~T~:":' ::" : ~ "?'"'"':':" /:~]::~?~:~]~::~ ~::~.:'"::;::" ." ..... .:'.: ....... :':'"..:.;'"~ .':.~'..~'::~:? .".' "'" :~?.::.'"':"..' '~::"..:'~::~:<:::~:~:~. : ~ "':?"'.~':':;. :.~':'.'.'.'T:.".:?~4:.': ' ;'..: ::::.. '~' ': ;~:.'.'.'~ :. :.. '.: ': : ~ ~.q:; '..'?. . ' . . 56 ~ 6 5209, CIO 5 ~ 00, O0 ~ ~ ~ 7, 33 N 5~5, 28 N 407, 50 20.84 5735 5309. O0 5200. O0 1168.77 N 604.8~ W 426.7~ 19.22 ' ~ "" .... ., ....,.......,.,...... ....... .... ...,.,......,...,~ ........... ...~ ....... ., ..... , ......, . .,.. ,.... .... ..,...........,.,, ......~.~.: ............ ,,..,.,...,...,,.....,..,......,....... ,.....~,.:...,.,:.,....... ..... .,.,..._.....~...,.,~. ,.....,, ~...,...,....~,........ ,.,.., ...,.,...,...... ~.. . .. JF'~RUK DC:TOBER 3, l~83 dOB NUHBER ~K-BO-30 LASKA KELLY BI_oHING ELEV. = 109.00 FT. . . ,': ' ,: ~.,., /.::J J?:;;;;', iL ' .'~:;"~"~?,:,~ ~: ';';~',:h:",:?';' JF~:;k{.'?':',:i/?;;:]~]: ?~' ':~ i;:' '. :':' :, ':,. I'RU[ SUB-SEA TOTAL MEASURED VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL ' EP H' ... ......... 63t4 ........ { 6c, o6 6009. O0 5900 O0 1485.99 N 827.9& W 527.72 10. 87 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM RADIUS OF CURVATURE') POINTS ......................... ~ ~ ~ . · . :- : .. ..... vk ;~:-.~ ~ ~ ~: ..-i...~, k:_ ;.~ w: '~:':' :...':~ ' ..: , · ';~ .' ;. ~:':,": ~..": :.~.>'.}:?:':::?,:~:~:~:~':~;??.~{:?::?.?~::~?~?.~,~:~:~::: :.:'~ ,~ ~:~:~:.~:~?~?~:~?:;~:~?~??::~;:%;~:::~?~::::¥:?;~::?¥~¥~?~;:?~:x:¥~:~:~:n;~:::~:~`: ~: ¥ 4:':.:..'...~.':,.:::.', :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ~`~::~:~:~:~:~:~:~:~;:~:~:~:~:~:~:~:~:~:~:~:~t~::;:~:~;~:~:~::~::~:~:~;~:~:~:;~:]:i:~::~:~::~:~:::~:~:~:~::~:~:~:~:~::~:::::::::::?~:~;::~:~]`~::~:~:;::::~:~::::::::~]`~:~::~%~:~:~ ~ . . . . ... · · .' ~'..: /.-..,....,., ..,.,,..::,........~.,.,,.., ,....~ .., .........,..~..., ./, ..,,~,...:,...:..:..,x.:?,.? :',:.>::.:,:.Fx.:,:.:~,..:,:.:,>:::.:.~.',..x,.'., .,.' ...: .'.:.,.:',':.x.?;:¥:.,.~., ,.../:,:..:<cv:..:.;...,..,x,:.. x..., ...:.?..%:< ¥/..:,..?,..~.v,....x, .:.::.:,. ~,..,,.:,, ,,:<,-.c,, ,.., v..,...,...x.~.:.,,:.+:+.,:...:.;.:~.,..:.:.;,...:,,:+..,,:..,4.:,:,: .;.x:. o'" '.?.,'.' ?: >~:~::.:. ,~'.: ,.~.' ' :.¥.:,. ..:/. ,,:.,.t~,..:.x,.,'.. :'.L. :.. ~ · ~.~'.'~ .: · .' .% . .:..,. :.. ,:f:.~'.-', ,.:~p~:.:.¥..~::::~ ~,:¥:~: :~:~::,.: ..~ .~:~: . ~.~,. :,::,.~.:,.;~. ;: :...::? :~x.~:~:!~?~.,4:~::. :..?::::: :: .m.:...,, ',~x:~ ':~:::':..:.~-:::,:~ ~:~:~:.;: :~:. yx,~':~..:.~ '4::::,¥. ~ ',:'.,..,.'.,..::.: :~::~.~:::.::¥:;:::::,::~:::.:..:,¥:;.;~: :,,,,. ~.;,::~:,:~::,~.,::~,~:::;:,:,,,:.::~::::,:,.::.:s:,.:,..::,~,...:.:.,.:.., ~ KLIP~RUK OCTOBER'-' "~-~. 198.~ JOB NUMBER ~K-BO-30105 '  ALASKA, . KELLY BUSHING ELEV. = 109.00 FT. ..~ I'RUE SUB-E:EA TOTAL MEASURED VERTICAL VERTICAL RECTANGULAR COORDINATES ............... . ..",,' ,,:,-,,,:,:.,..',:x~.::,.,:,:,:+:,~,:,.:,,:,.,::,~,:. ,.:,:,::., ,:.,,, ~,',..r '.'r :,Y'x~,¥:'~,;.:;,~' :~: ],, ~" .'., ": '] 6555 6025.55 5916.55 1492.49 N 832.17 W TOP LOWER SAND 66,78 6138.16 6029.16 1534.34 N 858.57 W BASE LOWER SAND ..' ~ ...... '~.:' .... '.'".' ....... ' '~' :'".r'.~?..~ .......... '"'""~'": .......... ~"~' ""., :, ~'~.~'...'.~. '"./':?.". .......... ' ........ ~' ~ ~?;:.:'.'".~:h'::~,::..~;~ ~,~ ~:~ ~;;:~?;~:~:~:~,~:~ :'~:,'.'?~.~:'.'.'.~"~ ...... ......... '~ ....... ' ~:~}~ ~ ~.' ~'.'~. .....~ ~:. :,:..:' :::.'~, :::::: ~':i, ::,: ;:¥?:',.'.:;::.::::':.~;.;:.:¥~¥~J.:~ ::~:;~:%~:~:~:::~:~?:~ .::i::,','~.~,,:::: ,.:::~.~: ........ ~::.:?:::.:',.:' ............. ~.~.~::~:~:~:~:~..~:~:~.~?~?~;~??~?~:~]¥.~?:~????~.;~?~?.~?~:??:?:~.~?`~:~?~?.?]~.~;~?:~}~}~?:?~?.:?~:.~??~?~;???~?~?~?~???~.??~?:~;~:.~?~?~??~.7?:~.~?~??;~ ~,~:?.:':':: :/];~' '+" ~: =.:' '~.. ' ' ~ ' ~ ,.... 7'.: DERIVED USING DIL DEPTHS AND SPERRY SUN SURVEY DATA TO WEL!-HEA.D. TOP UPPER SAND ToP'LowE~ BASE LOWER' ......... SURVEY--DE~T~ PBTD TOTAL DEPTH DRILLER 6432 5914.52 5805.52 6738 6193.55 6Q84.55 6840 6287.74 6178.74 1554.01N E:70. 1587.43N 891. OOW C'. kRCO Alaska, Inc. Our Boss Gyroscopic Survey Job No. AK-BO-30105 Well: ~1 F-12 (SEC 19 TllN R10E) Kuparuk Field North Slope, Alaska Survey Date: October 2, 1983 Operator: Samec Scale: 1" = 500' C8~C T~UE NO~TH -1500.00 -t000.00 i00.00 -10~0.00 -50~3. O0 I iSurface Location 452 FNL 514 FEL -500. OO HORIZONTAL F' R 0 J E"-' T 'r 0 N C ARCO Alaska, Inc. Our Boss Gyroscopic Survey Job No. AK-BO-30105 Well: ~1 F-12 (SEC 19 TllN R10E) Kuparuk Field North Slope, Alaska Survey Date: October 2, 1983 Operator: Samec Scale: 1" = 1500' 0.00 1500.00 3000.00 4500.00 60OO, O0 7500.00 1820.39' @ N 29°18'W ~5bo. oo ~obo. oo VERT!CRL PROJECTION Suggested form to be inserted in each "Active" well folder to d~eck for tin~ly compliance wJ_~-~ our rc<julations. ' O~erator~ W~I Nan~' and' Number-". and Materials to be received by: .- --, /~-t~,..~'r~' F'~ Reports Date Required Date Received Remarks Completion Report Yes /.~ .... f'~ ~Aw~''- ~,3 ~-~. /~"<~-. _ Wel 1 History Yes I Samples ~"JK' ' . ,ua. ,-.o~ ,~.~ _~ ~ / ..... - , ,, \. · Core Chips -' C'~ ,. Core Description /Kd ~ .... ~- .... Registered Survey Plat y~.~d Inclination Survey · Prcddctidn Test Reports 7r.~ / ms,,=. ~es Digitized Data Ye¢ /0 -- t~ --:_~ D/d ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 November 29, 1983 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT: 1F-12 Dear Mr. Chatterton: Enclosed is a Subsequent Sundry Report for the subject well. you have any questions, please call me at 263-4944. Sincerely, Gruber Associate Engineer JG:tw GRU5/L43 Enclosure If ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany ~ STATE OF ALASKA ALASKA _. _ AND GAS CONSERVATION Ct .,vllSSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL[] COMPLETED WELL E~X OTHER [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 83-136 3. Address 8. APl Number P. 0. Box 100360 Anchorage, AK 99510 50- 029-21012 4. Location of Well Surface: 452' FNL, 514' FEL, Sec.19, TllN, RIOE, UN 5. Elevation in feet (indicate KB, DF, etc.) 109' RKB I 6. Lease Designation and Serial No. ADL 25652 ALK 2578 9. Unit or Lease Name Kuparuk River Unit 10. Well Number 1F-12 11. Field and Pool Kuparuk River Fi eld Kuparuk River Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report,.or.Other'D§ta ..... ~ 'c_,.. SUBsEQUENTR~F: NOTICE OF INTENTION TO' (Submit in Triplicate) .............. (Submit in'~ Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon [] Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonmentsee 20 AAC 25.105-170). RU Dresser - Atlas. Ran GR/CBL/VDL/CCL to 6733' - good bond. Ran Gyro. RD Dresser-Atlas. Reset master valve and tubing adapter. Secured well. Accepted rig @ 1330 hrs, 10/26/83. ND tree· NU BOPE & tstd - ok. Perforated the following intervals w/12 spf, 120° phasing: 6470' - 6450' 6450' - 6434' Set FB-1 pkr @ 6522' (WLM) Ran 3-1/2" completion assembly w/tail @ 6547' pkr ~ 6320' & SSSV ~ 1840' Installed BPV. ND BOPE. NU tree & tstd to 3000 psi - ok. Disp well to diesel. Set pkr. Closed SSSV. BPV. Secured well & released r!g ~ 0400 hrs, 10/29/83. Set 14. I hereby cer,t,~y ttT)at the foregoing is true and correct to the best of my knowledge. Signed Title Area Drilling Engineer Th esp ace b e/f ~¢/~o~m~-f'/n use Conditionpf Approval,~ny: · By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 6RUS/SN18 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Post Office L,=^ ,~60 Anchorage, Alaska 99510 Telephone 907 277 5637 November 17, 1983 Mr. C. V. Chatterton State of Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton' Attached are the notices of intention to 1F-11 and 1F-12 in the Kuparuk "C" sand. have not flowed since they were perforated. If you have any questions, please call me Charles K. House Kuparuk Operations Coordinator CKH/kmc Attachment (In Triplicate) stimulate wells These two wells at 263-4527. ARCO Alaska, Inc. is a subsidiary of AtlanticRichfieidCompany STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator ARCO ALASKA, INC, 3. Address P. O. BOX 360, ANCHORAGE, 4. Location of Well SURFACE LOCATION' 452' TllN, R10E, UM BOTTOMH T1 5. Elevation in feet 1(]9' 12. ALASKA 99510 FNL, 514' FEL, Sec. 19, 7. Permit No. 83-136 8. APl Number 50- 029-21012 9. Unit or Lease Name KUPARUK RIVER UNTT 10. Well Number 1F-12 OLE LOCATION' 1200 FSL, 1300' FEL, Sec. 18 11. Field and Pool 1N, R10E, UM KUPARUK RIVER FIELD (indicate KB, DF, etc.) I 6. Lease Designation and Ser!al No. KUPARUK RIVER OIL (RKR'~ I ADL ?Sgg?~ Al k'_ 9_978 POOL - ' Check Appropriate Box To Indicate ~t~re o~ N-otice, ~eport, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate ~] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. proposes to acidize the "C" sand with a 12% HCL containing MSR-100 (mud and silt remover with iron sequestering agent) using a CTU. The treatment is designed to surge the perforations several times with acid to open as many perforations as possible. All lines and CTU will be pressure tested to 4000 psi. Fluid estimates are: 12% HCL, 116 bbls; nitrogen, 2000 gals.; diesel, 40 bbls. Well 1F-12 has not flowed since it was perforated. A similar acid stimulation on well 1F-10 resulted in a flow rate of approximately 1500 BOPD. Expected start date' 11/23/83 Subsequent Work Reported Fo= 14. I hereby certif~ that the fore, going is true and correct to the best of my knowledge. The space below for Commission use OPERAT IONS COORD I NATOR Date Conditions of Approval, if any: Approved by COMMISSIONER Approved Copy Returned By Order of the Commission Form 10403 Rev.~->tC~cted Start Date' Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate .~RCO Alaska, In(~' Post Office ,.,uX 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 October 15, 1983 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton' Enclosed are the Monthly State Reports for the following wells' 1G-10 1F-10 1G-11 1F-11 1G-12 1F-12 1F-9 1F-13 Thank you. Sincerely, in 'A~~t ~ ~~c~ t Drilling Engineer JBK/SHIO' sm Enclosures ARCO Alaska. Inc. is a Subsidiary of AtlanlicRichfieldCompany " - STATE OF ALASKA - AIASKA ~' 'At'ID (~AS (~O~JSEF~VAT'Or~ (~k" °~/1'SS'O~J O~~ 'MONTHLY REPORT OF DRILLING AND WORKOVER OPERATI · Drilling well [~X Workover operation [] 2. Name of operator 7. Permit No. ARCO~Alaska, Inc. 83-136 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510 50- 029-21012 9. Unit or Lease Name 452' FNL, 514' FEL, Sec. 19, TllN, RIOE, UM Kuparuk River Unit 4. Location of Well at surface 5. Elevation in feet (indicate KB, DF, etc.) 109' RKB, Pad 80' 6. Lease Designation and Serial No. ADL 25652 ALK 2578 10. Well No. 1F-12 11. Field and Pool Kuparuk River Field Kuparuk 0il Pool For the Month of. September ,19 83 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Spudded well @ 1830 hfs, 09/19/83. Drld 12-1/4" hole to 2284'. Ran, csg. Performed top job. Contd drld 8-1/2" hole to 6840' TD. Ran logs. 7" csg. Displ top 110' of 7" csg is void. Secured well and released 09/27/83. cmtd & tstd 9-5/8" Ran, cmtd & tstd rig 8 0100 hrs on 13. Casing or liner run and quantities of cement, results of pressure tests 9-5/8" 40# & 36#, J-55 HFERW BTC csg w/shoe ~ 2254'. Cmtd w/1000 I. 7" 26#, J-55 HFERW BTC csg w/shoe @ 6819'. Cmtd w/600 sx Class "G". sx AS II I,+ 250 sx AS 14. Coring resume and brief description N/A 15. Logs run and depth where run DIL/SFL/SP/GR/Cal/FDC/CNL f/6796' to 2254' 6. DST data, perforating data, shows of H2S, miscellaneous data N/A 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. /--I/ f/ / ',,.,; //,- ..... / ;~/ -~ _ NOTE--Rep~C't od~this ~/Srm is required for each calendar month, reg~,rlal~ o~)~h~lslla~u~J~:~'li~e~altil~a~se pnd must be fded in duplicate with the Alaska Oil and Ga~l~onservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 Submit in duplicate 1F-12 DRILLING HISTORY NU 20" Hydril & diverter. Spudded well @ 1800 hrs, 09/19/83. Drld 12-1/4" hole to 2284'. Ran 57 jts 9-5/8" 40# & 36# J-55 HFERW BTC csg w/shoe @ 2254'. Cmtd 9-5/8" csg w/lO00 sx AS III & 250 sx AS I. Bumped plug w/2000 psi - floats held - ok. ND 20" Hydril & diverter. Performed top job. NU wellhead. NU BOPE & tstd to 3000 psi - ok. Tstd csg to 1500 psi - ok. Drld FC & cmt. Tstd csg to 1500 psi - ok. Drld FS & 10' new form. Tstd form to 12.2 ppg EMW - ok. Cont drlg 8-1/2" hole to 6840' TD as of 09/24/83. Ran logs DIL/SFL/SP/GR/Cal/FDC/CNL f/6796' to 2254'. Reamed hole to bottom. Ran 171 jts 7" 26# J-55 HFERW BTC csg w/shoe @ 6819'. Cmtd 7" csg w/600 sx class "G". Bumped plug w/2000 psi - floats held ok. ND BOPE. NU tbg spool & tstd to 3000 psi. Displ top 110' in 7" casing of brine and left hole void of fluid. NU tree. Secured well and released rig @ 0100 on 09/27/83. HILL/DH45 10/17/83 .. TO: - ¥/i I I i am VanA! en R'EA4: D. ¥"/. Bose/Shelby J. Matthews Transmitted herewith are the followincj- PLF_ASE KOTE- BL -. BLUEL! NE, S - SEP IA, F - F I Uk4,~FC - I:~D'FOCO~ /'CYd' :O)A_EI-PG F-/): . E P, EPJP~ RECEI FF- TO: AZ,OD ALASIO",,, I NC. A'FFH: SHELBY J. MA.'Frt-ILkq,~,G - ATO/1 1 1 5-B P. O. BOX 100360 ANC]4OP, AGE, ~(. 99510 PHASE II - AS .BUI LT, WELLS 9 thru 16, 18 PHASE I EXISTING WELLS I thru8 17 DRI["-~-~ITE I-F CONDUCTORS AS BUILT LOCATIONS 20. ' Y = 5,,q58,895.613 X= 539~491 4.97 6~0' FNL WELL 9 WELLIO Lat. 70° 17'55.1255" Long. 149°40'48.661" 484' FEL Y = 5,958, 95&679 x -- 559,48~S48 570' FNL WELLll Y = 5,959,013.76~?. X= '539, 470.2t4 511 'FNL Lat. 70e 17'55.7070" Long. 149°4d 4.8.962" 4 94' FEL WELL Y= 5~95'9,072. 920 = ,539~459. 5TT 52' FNL LO t. 70° 17~56~-8 8 7" Lm~ ~m,,4o'4e.2s4' 504' FEI_ WELLI3 Y=" 5, ~59~ 140,047 X= 539,853.596 387' FNL L~t 70417'56.8711" I.oe ~, 14~® 40' 5i4' FEI. WE;LL 14- Y= 5,$59,081.057 X= 539~844.251 · 446' FNI. LOt. 70 °I7' 57.5t20" Lom]. 14.9°40~ DB.GSO'' 139"FEL LOt.70° 17'56.93t2" Lon;.,t49040'3e~48" I29'FEL WELLI5 Y= 5,959~022. ooQ X= 539,854.796 ~ 505' FNL I.m .70o 17 56.3498 L omi. 14~=40~ 58.05. 119' FEL WELLI6 Y: :~? D58,9~:~?..891 Lat.70° 17' 55.767T" X 539,865.492 Lor~. 149 e40'$7.748" 564' FNL ICg'FEL NOTE BASIS OF ELEV. IS TBM -F MIDDLE- PER LHD & ASSOC. ' · LOCATED IN PROTRACTED SECTIONS 19 TOWNSHIP il N., RANGE I0 E., UMIAT MER. NOTE: BASIS OF BEARING IS MONUMENTATION i-F .MIDDLE AND I-F SOUTH $~ET BY LHD and ASSOCIATES 6 I HEREBY'CERTIFY THAT i AM PROPERLY REGISTERED AND-LICENSED TO PRACTICE --LAND SURVEYING IN THE STATE OF ALASKA~ AND THAT THIS PLAT REPRESENTS A SURVEY MADE UNDER MY DIRECT SUPERVISION AND THAT ALL 'DETAILS ARE CORRECT AS OF 'AUG 5,1g83 18 -- 19 THIS SURVEY [~..-. ~f.~ ARCO Alaska, Inc. 1115511& ""': "'"' drawn by'PJ~ . dwg. no. NSKg. I06.§ d4 ARCO Alaska, In~''''''' Post Office ~ox 100360 Anchorage, Alaska 99510 Telephone 907 276 1215 September 19, 1983 Mr. C. V. Chatterton Commi s s i oner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT- 1F-12 Dear Mr. Chatterton. Enclosed is a Sundry Notice for the subject well. We propose to complete this well with our workover rig. Since we expect to start this work on October 17, 1983, your earliest approval will be appreciated. If you have any questions, please call me at 263-4970. Sincerely, / ArM Drilling Engineer JBK/GRU4L55- tw Enclosures Aiask~l Oii & Gas Cu~,.~. Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCornpany STATE OF ALASKA ALASK.~ L~L AND GAS CONSERVATION UOMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 83-136 3. Address 8. APl Number P. O. Box 100360, Anchorage, AK 99510 50- 029-21012 4. Location of Well Surface: 452' FNL, 514' FEL, Sec.19, TllN, RIOE, UM 5. Elevationinfeet(indicate KB, DF, etc.) 109' RKB 12. I 6. Lease Designation and Serial No. ADL 25652 ALK 2578 9. Unit or Lease Name Kuparuk River Unit 10. Well Number 1F-12 OTHER [~X 11. Field and Pool Kuparuk River Field Kuparuk River 0il Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF~: (Submit in Triplicate) (Submit in Duplicate) Perforate E~x Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other E~X Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc., proposes to complete this well with the Westward Well Service Rig #1. The procedure will be as follows: 1) A mast truck will be utilized to run the CBL/VDL/GR and Gyro. 2) The rig will be moved on location; the BOPE will be nippled up and tested. Selected intervals will be perforated within the Kuparuk formation and reported on subsequent reports. 4) The well will be completed with 3-1/2", 9.2 #/ft, J-55, BTC tubing. A 13-5/8", 5000 psi, SRRA BOP stack will be used on well work. The BOP equipment will be pressure tested weekly and operationally tested each trip. A non-freezing fluid will be left in all uncemented annuli within the permafrost interval. A 5000 psi WP wireline lubricator will be used and tested on all wireline work. The subsurface safety valve will be installed and tested upon conclusion of the job. Estimated Start: October 17, 1983 ~% . :-~ ~, ._~ · :~ h ? o -,.- ,., ' Anchorage Work Beporterl Subsequent ~ated/-L[/~-~ o~ Form No. Date 14. I hereby ce?t'ffl¢ that the foregoing is true and correct to the best of my knowledge. /? Signed [ /f · ' Title Area Dri l 1 lng Engineer ' - The spac w~ 'nlsslon use Conditior~ of App~il, if any: Approved Copy P. eturned Date 9RIGIIt~t' SIGN£9 By Order of Approved by _~ ~_0~!~ _~. S~!T~ COMMISSIONER the Commission Form 10403 Rev. 7-1-80 GRU3/SN30 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate MEMORANDUM ALAS~.~ OIL AND ~z~S CO~SERVATIO~ T~RU: ~zie C. S~&th FILE NO: CO~D3i~ ~ione~ TELEPHONE NO: FROM: ~ar ~. ~i~le¢ ~etrole~ Ins~ctor ~ / SUBJECT: Alaska September 23, 1983 10SA:D2 Witness BOPL Test on ARCO's Kuparuk 1F-12, Sec. 19, Ti1N,R10E, U.~".'., PezT~-~t I%o. 83-136, Parker ~i9 141. Tuesday,_. Septem.ber 20, 1983: I traveled this date from Anchorage via Alaska Airlines, Flt. #61 to Prudhoe Bay to witness a ROPE. test on ARCO's Kuparuk 1F-12, Parker Drilling Rig 141. The drilling contractor was in the process of running casing. WednesdaY. _ Septe~b~_ r 2 t, 1983: The BO PA-'" test c omr~nc ed at 4: 35 pm and. was concluded at 6:00 pm. There were no failures. in summ. ary, I witnessed the ROPE test on AP-.CO's ~uparuk 1~'-12, Parker Rig 141. Attach~-~nt 02-00IA(Rev. 10/79) ~&G ~4 4/80 STATE OF AI,ASKA ALASKA OIL & GAS CONSERVATIO[~ COMMISSION B.O.P.E. Inspection Report Inspector well Operator ~. ~j ~ /~q/~/~ Well Location: Sec /~ T Drilling Contractor Rig Representativ Permit _~ ~/_~Casing Set @ ~./ ft. ~Representative ~~ /~ ~// Location, General Well Sign General HOusekeeping Reserve pit ' Rig BOPE Stack Annular Preventer Pipe Rams Blind Ra3ns ~.- C~o~e Line Valves H.C.R. Valve Kill ~ine-Valves Check Valve Test Pres .sure , ACCU~,1ULATO R S'YS T Et.1 Full Charge Pressure 3/~d) ps,ig Pressure After Closure ~ ~OO psig 200 psig Above Precharge Attained: l. min ~ sec _ _. ~min O~ sec Full~ Charge Pres_sure ~tained: Cqntrols: M~ster ~<. ~.~ ~,?~,-, Remote Ok Blinds switch cover ~$ _Kelly and Floor Safety Valves - Upper Kell~ ~.Test Pressure Lower Kelly, d~(Test Pressure Ball Type ~ Test Pressure Inside BOP ~"'O~Test Pressure choke Manifold No. Valves 9 No. 'flanges ~ -' Test Pressure Test Results: Adjustable Chokes t /t~ llydraUically operated choke t .... '~'fi,~.¢ ~/~.,. ~ Test Time .......... ~-hrs. Failures Inspector/Commission office notified. . ,~,- . Distribution orig.' - AO&GCC cc - Operator cc - Supervisor. Septmmber 13, .1983 Mr. Jeffrey B. Kewin Senior Drilling Engineer ARCO Alaska, Inc. P. O. Box 100360 Anchorage, Alaska 99510 Res Kuparuk River Unit 1F-12 ARC~ Alaska, Inc. Permit No. 83-136 Sur. Loc. 452'FNL, 514'FEL, Sec. 19, TllN, RIOE, UM. Btmhole Loc. 1200'FSL, I300'FEL, Sec. 18, TllN, R10E, UM. Dear Mr. Kewtn: Enclosed is the approved application for permit to drill the above referenced well. If coring is conducted, a one cubic inch chip from each foot of recovered core is required. Samples of well cuttings and a mud log are not required. A continuous directional survey is required as per 20 AAC 25.050(b)(5). If available, a tape containing the dt~it~zed log' information shall be submitted on all logs for copying except experimental logs, velocity surveys and dipm~ter surveys. Many rivers in Alaska and their drainage systems have been classified as important for the spawning or migration of anadromous fish. Operations in these areas are subject to AS 16.05,870 and the re~lations promulgated thereunder (Title 5, Alaska Administrative Code). Prior to commencing operations you may be contacted by the Habitat Coordinator's Office, Department of Fish and Gam~e. 'Pollution of any waters of the State is prohibited by AS 4.6, Chapter 3, Article 7 and the regulations promulgated thereunder (Title 18, Alaska Administrative Code, Chapter 70) and by the Federal I~ater Pollution Control Act, as amended. Prior to commencing operations you may be contacted by a representative of the Department of Environmental Conservation. To aid us in scheduling field work, please notify this office 24 hours prior to eo~m~encing installation of the blowout %-~r. Jeffrey B. Kewin Kuparuk River Unit !F-12 September 13, 1983 prevention equipment 8o that a r~prementative of the Commission may be present to witne~ss testing of the equipment before the surface casing shoe ia drilled. W%ere a diverter ~ystem is required, please also notify thi~ office 24 hours prior to co~mncin8 equipment installation so that the Commission r,~ay witnes~ te~ting before drilling below the shoe of the conductor pipe. In the event of suspension or abandon~nent, pI~ase give this office adequat~ advance notification so that we may have a witness present. Very truly ~yours, C. V. Chatterton ~'.~ Aiaaka Oil and ga~ Conservation be~6:H/A Department of Fish & Game, Habitat Section w/o encl. pepartment of Environmental Conservation w/o encl. ARCO Alaska, Inc .... -'-. Post Office B:.i7100360 Anchorage, Alaska 99510 Telephone 907 276 1215 September 7, 1983 Mr. C. V. Chatterton Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 SUBJECT' Kuparuk 1F-12 Dear Mr. Chatterton- Enclosed are- ° An application for Permit to Drill Kuparuk 1F-12, along with a $100 application fee. ° A diagram showing the proposed horizontal and vertical projections of the wellbore. o A proximity plat. . o A diagram and description of the surface hole diverter system. ° Diagrams and description of the BOP equipment. Since we estimate spudding this well on September 20, 1983, your earliest approval will be appreciated. If you have any questions, please call me at 263-4970. Si ncerely, J. B. Kew in Area Drilling Engineer JBK/JG3/L41-sm Attachments ARCO Alaska, Inc. is a Subsidiary of AllanticRichfieldCompany STATE OF ALASKA ALASKA O,L AND GAS CONSERVATION CO,v,MISSION I ERMIT TO DRILL 20 AAC 25.005 la. Type of work. DRILL REDRILL DEEPEN lb. Type of well EXPLORATORY [] DEVELOPMENT OIL DEVELOPMENT GAS [] SINGLE ZONE [~/? ;?~r% MULT,PLE ZONE%_. 2. Name of operator ARCO Alaska, Inc. 3. Address P. 0. Box 100360, Anchorage, Alaska 99510 4. Location of well at surface 452' FNL, 514' FEL, Sec.19, T11N, R10E, UN At top of proposed producing interval 1200' FSL, 1300' FEL, Sec. 18, T11N, R10E, UN 9. Unit or lease name '~.-.~ Kuparuk River Unit 10. Well number ,~ . 1F-12 ~¢- 11. Field and pool Kuparuk River Field Kuparuk River Oil Pool At total depth 1200' FSL, 1300' FEL, Sec. 18~ T11N, RIOE, UN 5. Elevation in feet (indicate KB, DF etc.) 6. Lease designation and serial no. RKB 109', PAD 80' ADL 25652 ALK 2578 12. Bond information (see 20 AAC 25.025) Federal Insurance Company Type Statewide Surety and/or number #8088-26-27 Amount $500,000 13. Distance and direction from nearest town 14. Distance to nearest property or lease line 15. Distance to nearest drilling or completed 32 mi. NW of Deadhorse miles 3980' (~ TD feet 1F-11well 60' (~ s'urface feet 16. Proposed depth (MD & TVD) 17. Number of acres in lease 18. Approximate spud date 6849' MD, 6399' TVD feet 2560 09/20/83 19. If deviated (see 20 AAC 25.050) 20. Anticipated pressures 2525 psig@ 80°F Surface KICK OFF POINT 500 feet. MAXIMUM HOLE ANGLE 33 o (see 20 AAC 25.035 (c) (2) 2836 psig@ 6199 ft. TD (TVD) 21 SIZE .Hole Casing ~4" 16" ~ 2-1/4" 9-5/8" 8-1/2" 7" I ARCO Ai.]ska, inc Proposed Casing, Liner and Cementing Program CASING AND LINER Weight Grade Couplingl Length I 65.5# H-40 -- 80 ' I IHF'ERW I I 26# IJ-~5 IBTC I 6821' IHF-E"w / I , proposes 'to drill a Ku)aruk Rive SETTING DEPTH MD TOP TVD MD BOTTOM TVD 29' I 29' 109' 109' 29' 29' 2389'12200' 28' i 28' 6849' 16399' · Field development well to approx~ QUANTITY OF CEMENT (include stage data) The space below for Commission use Samples required CONDITIONS OF APPROVAL ~NO ~LY E S E]NO 50-0 't, c~ _.%,/O I ~ SEE COVER LETTER FOR OTHER REQUIREMENTS ,COMMISSIONER DATE ~,-,~-~-nl~,-,~ 1 q 1 o.qq ~_ order of the Commission by TVD). A 20", 2000 psi annular diverter will be installed on the 16" conductor while drilling the surface hole. A 13-5/8", 5000 psi, RSRI{A BOPE stack will be installed on the 9-5/8" surface pipe. It will be tested upon installation and weekly thereafter. Test pressure will be 3000 psig (1800 psi for annular). Expected maximum surface pressure is 2525 psi. Pressure calculations are based on latest reservoir pressure. Surface pressure calculated with unexpanded gas bubble at surface including temperature effects. Selected intervals will be logged. The well will be completed with 3-1/2", 9.2#, J-55 8rd tbg. Non-freezing fluids will be left in uncemented annuli through the permafrost interval. Selected intervals will be perforated within the Kuparuk formation and reported on subsequent reports. A downhole safety valve will be installed and tested upon completion of the job. IF-II will be 60' away from 1F-12 ~ the surface. There are no closer wellbores anywhere downhole. Top of cement for the production string will be placed ~ 2856', approx 500' MD above the West Sak Sands. If the Ugnu is hydrocarbon bearing, cement will be brought 500' above it. Reserve pit fluids iwiii be disposed of down the 9-5/~" x 1" annulus. The 9~5/8"-x 7" annulus will be left with a non-freezing !fluid during any interruptions in the disposal process. t SIGNED~'~.~¢... t~"~.~%~ j~)~.. _'--~'7~_ ~ TITLE Area Drilling Engineer DATE []YES ~'NO []YES Permit number ~ I Approvagcl~te I ~ ' ~ ~// //~ APPROVEDBY ' /' ~ Submit in triplicate · 200 cf 1100 SX AS III & 250 sx AS I 225 sx Class G extended 300 sx Class G neat mately 6849' MD (6399' : .... ~ ..... ! - i .... i .... I - -- : ..... ~. - .~ ..... I - . i ..... I ....... t' ~--: ....... 1 ....... t ............. J :"- ~--: ..... ~ ..... : ....... ~ ............. : .... ~1 ' ' ' : ...... !" .- EAST~A~ ~HJPSTOCK._ I~C .................. ~ ................... , ............. ~ ............... ~ .... J ............ , ........ ......, ~ ~:' ' ' ~ .... ~ ..... ~ ........ : 1' ...... ~ ................ ~ -' ~-- ....... : J~~~~--~4-1 ~' .... : .... J .... : ........ ~ ...... ~ ~ - .... :~ .......... ~ ...... ~ ....... j, .......... ~ ~ .... :. ~, . . ....... ~..~' ..... ~, ....· '_.~~ ~-~ .... ~._~¢.._~:~._ ~_, ~=,~~iw .................. ~ I~ ...... ..... ~ .......... : ...... ~--~x--~ ..... , ......... ~ .... ~'-: ..... ---m---- .... v-~-~-~-------~----t-~--~ r"~-~u'~rx~u=.~-'-, .......... ~ ..... Y-' -L~-~ 7_i---: [//._~' f'~.~ ---lY.-~I~_iZ: .._--~Z_L~_~i __~U .... ~ .... ~i_~SL~S 4_~--2~ J 5'i~21SSi/i.:---L_i;i _L :~_ Z [Z-~i. ~L ~_f; ;. Z :S'j :i'__-~Ui~il L/Z_'__ :::::::::::::::::::::::::::: ......./:': ::: ::z_:iZ-_:::::: :]:z-_:)::_i::]::::~'~:::-: 27 :-::~yj/:-~:m~2Ks~y-~000_~ :'-4::m: :':~ 0001" [u_H: ':1'_' ~ '7::' .:_ ~_ix:::::'~-000 .............. ~ ....... : ..... J ........ ~ ..... ~ ...... ~ ............. [ - . : ... ~ I . 7000_ 0 ......... ~ .......... ~ ............. ~ .................... 1 ......... I .................. ~ .............. 4 ...... i ,Dg---DEP= t 829 .......... i:- ................ t :'-~ .......... ~ ..... ...... 5ooo :- ....... : ~ ...... I ........... ) : : · ' ~ ~ .... T~ : : ~-'-- : - ] : : .... :t:~-: .... ~ ..... . ...... : ......~ ..................................... - ~ .... ~ ..... T.~--~:--~ .......... ~ -=-: '-~'-~--~:~--:--": i~ ...... :: ......... : .... ~ ............................... ::::::: L::--:-:-: AVERAGE- N_GEE ' 2~~:--- .~l: .: ~ .'--:::_T-T::_T_2:'_::::::-: '::'-:'::::: ::::7:'-::_: .......... ~ .......... .... ,_..:':':1 ........ ..... : ..... ....... , .... <__l_u .... , ..... .... ......... ~-;-: j .... ~ : :I--~-TOP ~UPPER SANDS ........ 6000- _ . . .~ _ .. ",-~-.-~TTARG~-CENTE~VD~6086~HD-=6536--DEP-~1829.- . ...... ' [ BASE KUP JSANDS TVD=6199. THD=6649 DEP=1829 :. - -:-- - '-~ ....... -~-::~ .......... ' ....- ..... : ---LOGOING-PT -TVD=6399 THD=6849 DEP=1829. ..... . .............................................. 1 000 2000 vERTICAL SECTION ...... ~o ......... ~300 --~ -~ - oo -i oo-.',-;-:_-:--:;p ....... '~ ...... ~l.o0 ' ~00 ! ~--;-::,~00~ i ..... t,,.., i ....... J ........... ; ........... i .........~ ....... I ..... : ...... j .... : .......... i ...... ....... ! --. ~ ss3 I.e~- 4: ........ ~ ......... i ........ ~ ......... ! ......! .......... J ...... ~ .......... i ....... ! .......... J ....... ~9~o'::_':i ..... i L~-~":_] ;.: :_: :~ :__,:::j-::'.:'::::~_._::^RCO ;ALASKA..INC.:-:::i. :.._ : -. ;:-:;::i ;--:: ~ ~ ~- ~11799 : ~ i . AD 1F, :~ELL~O: I~R~POSE~ . ~. . :%.:. ::: { :_:- :_:. _:'~Z'__~'-:. :-i::.:~ '~; :_ :-;-:-:~KU~ARUK ~FI-ELD,-. :NORTH:SLOPE,- ~LASKA "- -' - - -~ ........ -1- ........ ~H'IS.--¥, I.EW I-N8- ~.I N DOW ............. : .... ~ ........... ..... L .__;_ -L ..... -1 ....... I ............ ~ .................. i ........... i ......... ..... --i---:-, 1- ......... -L__._:__ / ...... 4 ..... ~, .......... !..:---:---;1 ......... -:' ..... .... ...... ....... ..... .'...: i-----I ....... ._. : ......... ~ ................. ~ · ~ . _ . -2134. .... I ............. i ......... ~ ' ' ' : .... ', .... 7_:_[' ':::. - ' ~' ............................ ' ....... ; ......... " .... 2076' { ' ' ;':-;7--; :i:-;- :---- ': ........... 1'_: ................. : ..... 1 ........ i L i . 5. e Surface Oiverter S~'s~m !6" - 2000 psi Tankco starting Tankco quick connect assy, 16" x 20" 2000 psi douole stucce~ a~aocer. 20" 2000 psi drilling s~coi '~,/~O" site / outl ets. 10" ball valves, hydraulicaily actuated w/lO" lines to reserve piT. Valves to open automatical ly upon closure of annul ar preventer. 20" 2000 psi annular'preventer. 20" bell nipple. Maintenance & Operation 2~ Upon initial installation close annular preventer and verify that ball valves have opened properly. Close annular pre~enter and blow air through diverter lines 'every 12 hours. Close annular preventer in the event that gas or fluid flow to surface is detected. If necessary, manually override and close ball valve to upwind diverter line. Do not shut in well under any circumstances. 16" Conductor BLIND tLIMS ) zo (- PIPE ARMS ) 9 DRILLING SPO~L PIPE ARMS ~ I I . HD -> D IAGRA~4 ~2 13-5/8" 5000 PSI RSRRA BOP STACK 1. 16" - 2000 psi Tankco starting head 2. 11' - 3000 psi casing head 3. 11" - 3000 psi x 7-1/16" - 3000 psi tubing head 4. 7-1/16" - 3000 psi x 11" - 3000 psi double studded adapter 5. 11" - 3000 psi x 13-5/8" - 5000 psi spacer spool 6. 13-5/8" - 5000 psi x 13-5/8" - 5000 psi drilling spool 7. 13-5/8" - 5000 psi pipe rams 8. 13-5/8" - 5000 psi drilling spool w/choke and kill lines 9. 13-5/8" - 5000 psi pipe rams 10. 13-5/8" - 5000 psi blind rams 11. 13-5/8" - 5000 psi annular ACCIJMULATOR C, RPACITY TEST 1. CHECK ANO FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYORAULIC FLUIO. 2. ASSURE lliAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORO THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORO ON NAOC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND i200 PSI REJ4AINING PRESSURE. 13-5/8' BOP STACK TEST 1. FILL 80P STACK AND MANIFOLD WITH ARCTIC OIESEL. 3. CHECK THAT' ALL HOLD DOWN SCREWS ARE FULLY RE'FRACT- EO. PREOETEILMINE DEPTH THAT TEST PLUG WILL SEAT ANO SEAT IN WELLHEAO. RUN IN LOCX OOWN SCREWS IN HEAl). 3. CLOSE ANNULAR PREVENTER AND_CHOKES AND BYPASS VALVES ON MANIFOLD. 4. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES. ~ 5. INCREASE PRESSURE TO D HOLE FOR 10 MINUTES. BLEED TO ZERO PSI. 6. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS. 7. INCREASE PRESSURE TO~O HOLD' FOR I0 MINUTES. 8. CLOSE VALVES OIRECTLY UPSTREAM OF CHOKES. BLEEO OOWNSTREAM PRESSURE TO ZERO PSI TO TEST VALVES. TEST REMAINING UNTESTEO MANIFOLO VALVES, IF ANY, WITH 3000 PSI UPSTREAM OF VALVE AND ZERO PSI DOWNSTREAH. BLEED SYSTEM TO ZERO PSI. g. OPEN TOP SET OF PIPE RAMS AND CLOSE BOTTOM SET OF PIPE RAMS. 10. INCREASE PRESSURE TO 3000 PSI AND HOLD FOR 10 MINUTES BLEET) TO ZERO PSI. 11. OPEN BOTTOM SET OF PIPE fLAMS. BACK OFF RUNNING JOINT ANO PULL OUT OF HOLE. CLOSE BLINO RAMS ANO TEST TO 3000 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. 12. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLO ANO LINES ARE FULL OF ARCTIC OIESEL ANO ALL VALVES ARE SET IN DRILLING POSITION. 13. TEST STANOPIPE VALVES TO 3000 PSI. 14. TEST KELLY COCICS AND INSIOE 80P TO 3000 PSI WITH KOOMEY PUMP. 15. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM SIGN AND SEND TO DRILLING SUPERVISOR. 16. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNC- TIONALLY OPERATE BOPE DAILY. C ANNULAR PREVENTER m BLIND RAMS PIPE RAMS 7 I I PIPE ARMS I I I HD DiAGRAM .: 1 13-5/8" 5000 PSI RSRRA BOP STACK 1o 16" - 2000 psi Tankco starting head 2. 11" - 3000 psi casing head 3. 11' - 3000 psi x 13-5/8" - 5000 psi spacer spool 4. 13-5/8" - 5000 psi x 13-5/8' - 5000 psi drilling spool ~. 13-5/8" - 5000 psi pipe rams 6. 13-5/8" - 5000 psi drilling spool w/choke and kill lines 7. 13-5/8' - 5000 psi pipe rams 8. 13-5/8' - 5000 psi blind rams -g. 13-5/8' - 5000 psi annular ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCIJ/4ULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE RE'PAINING AFTER. ~U.L UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON NAOC REPORT. THE ACCEPTABLE LOWER LIMIT IS 4S SECONOS CLOSING TIME ANO 1200 PSI REMAINING PRESSURE. 13-5/8' BOP STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL. Z. ,CHECK THAT ALL HOLD OOWN SCREWS ARE FULLY RETRACT- lED.. PREI)ETERMINE DEPTH THAT TEST PLUG WILL SEAT ANO SEAT IN WELLHEAO. RUN IN LOCK OOWN SCREWS IN HEAD. 3. CLOSE ANNULAR PREVENTER AND CHOKES ANO BYPASS VALVES ON MANIFOLD. 4. TEST ALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES. '~ 5. INCREASE PRESSURE TO 1800 PSI ANO HOLE FOR I0 MINUTES. BLEED TO ZERO PSI. 6o OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS. 7. INCREASE PRESSURE TO 3000 PSI AND HOLD FOR 10 MINUTES. 8. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES. BLEED OOWNSTREAM PRESSURE TO ZERO PSI TO TEST VALVES. TEST REMAINING UNTESTED MANIFOLD VALVES, IF ANY, WITH 3000 PSI UPSTREAM OF VALVE ANO ZERO PSI OOWNSTREAM. BLEED SYSTEM TO ZERO PSI. g. OPEN TOP SET OF PIPE RAMS ANO CLOSE BOTTOM SET OF PIPE RAMS. 10. INCREASE PRESSURE TO 3000 PSI AND HOLD FOR 10 MINUTES BLEED TO ZERO PSI. 11. OPEN BOTTOM SET OF PiPE RAMS. BACK OFF RUNNING JOINT AND PULL OUT OF HOLE. CLOSE BLIND RAMS AND TEST TO 3000 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. 12. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD ANO LINES ARE FULL OF ARCTIC OIESEL AND ALL VALVES ARE SET IN ORILLING POSITION. 13. TEST STANOPIPE VALVES TO 3000 PSI. 14. TEST KELLY COCKS AND INSIDE BOP TO 3000 PSI WITH KOOMEY PUMP. IS. RECORD TEST INFORMATION ON BLOgOUT PREVENTER TEST FORM SIGN AND SEND TO DRILLING SUPERVISOR. 16. PERFOR~ COMPLETE BOPE TEST ONCE A WEEK AND FUNC- TIONALLY OPERATE BOPE DAILY. CHECK LIST FOR NEW WELL PERMITS ,ITEM APPROVE DATE (1) Fee ~/_~ ~/~//~ 1. -4, 5. 6. 7. (3) Admin (12-t~ru ~)' (5 > BOPE ~..~.~ (2 i ih~u/2 (6 > Add :_'~~,~ 0 '10. 11. lB. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. Company YES NO 'Is the permit fee:attached ... ....................... ~~_ . Does operator, have a bondein fo.rc.e, i:i ..... : ...... :':'':'': .... :'i'':/~~~~ Is a conservation order n eded ................ ...... s administrative approva neede ................................... . Is conductor string provided ......................................... ~f __ Is enough cement used to circulate on conductor .and surface ......... ~4~,, Will cement tie in surface and intermediate or production strings ... ~F Will cement cover all known productive horizons ..................... ~4~ . Will surface casing protect fresh water zones ...................... , ~ Will all casing give adequate safet, y in Collapse, tension and burst.. ~ Is this well to be kicked off from an existing wel'lbore ............. ~ Is °ld wellbore abandonment procedure included on 10-403 ............ Is adequate well bore separation proposed . /~ Is a diverter system required ................................... ;... ~ Are necessary diagrams of diverter and BOP equipment attached ....... ~ Does BOPE have sufficient pressure rating - Test to ~,~ psig ..~_ Does the choke manifold comply w/API RP-53 (Feb.78) .................. Additional requirements ' REMARKS Additional Remarks: Geology: Eng~e~ing: ~w~ N ncs~f~ ~EW _~ WVA ~~ HJHJAL rev: 12/06/82 INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE Well History File ' APPENDIX Information of detailed nature that is not padiculady germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effod has been made to chronologically organize this category of information. VERIFiCATiON L~STING ,VP 010.N02 VERIFICATION L~STIN~ PAGE 1 )ATE 183/]0/10 ~ONTINilATION # ~0! }REVIOU$ REEL l ~OMMENTS ~LIBRARY TAPE ~APE NAME {8590 3ONTINUATION # :01 ;REVIOUS TIP~ 30~MENTS :LTBRIRY TAPE ~* FILE HEADER ?ILE NAME IED'IT .001 9ATE : ~AXIM{.I~ LENGTH ~ 1024 ~I[,E TYPE . PREVIOUS FIL~ ** COMPENTS ** UNIT TYPE CATE SIZE CODE 000 000 016 O65 000 000 005 065 000 000 008 065 000 000 004 065 000 000 004 065 000 000 002 065 000 000 008 065 000 000 006 065 000 000 004 065 5VP 010.N09~ VERIFICATION LISTING PAGE 2 , ~ ALASKA COMPUTING CENTER ~OMPANY m ATLANTIC RICHFieLD ~IJ~ ~ KUPARUK 2OUNTY = NORTH SLOPE BOROUGH SOB NUMBER AT ACC,' 68590 ~UN.. #1, DATE [~DP I HGH ~YP£ FLUID ~TSCOS!T¥ ~H ~ATRTX SANDSTONE = XC. POLYMER = 10,0 LB/G = 3g,O -'95 = 7:4 C] 2254~ - BIT SIZE = 8.~" TO 6840' ~MC RM AT BHT 4,.~00 tm 68,00 DF 4. 70 (a 68, DF 2.30,~ (~ 68 0 DF 2.26 14'~,'0 DF LVP 010.H02 VERIFICATION LISTING PAGE ** DATA FORMAT ENTRY BLOCKS TYPE SIZE 9 4 ~N~M SERVICE SERVICE UNIT API API ID ORDER # LOG TYPE DEPT FT 0 0 SFLU DIL OHMM 7 0 ILM DIL OHMM 7 0 SP DIL WV 7 ], ~R DIL GAP! 7 3~ NPHi FDN PU 42 68 DgMO FD~ G/C] 49 44 NCNL FDN CPS 4~ 34 FCNL FDN CPS 42 34 CAL! FDN I~ 42 ~ NRAT FDN 4~ 4~ W~A FDN ~ 0 GR FD~ GAPI 4~ 3~ REPR CODE 66 73 65 66 API APl FILE CLASS ~OD NO, 0 0 0 0 0 0 0 o ~ 0 0 ~ 0 0 0 0 0 ! 0 0 92 0 0 93 0 1 0 0 0 0 0 32 0 0 ENTRY 6O ,lin 0 SIZE PROCESS SAMPLE [,EVE5 4 0 1 4 0 0 0 4 0 4 0 4 0 4 0 4 0 4 0 REPR 68 68 68 68 68 6~ 68 68 DEPT 6817. 5000 SFI, U 3.4 SP. -20:0625 GR 114,7 ~WO~ 2 ~012 NCNL 1q35.,0 NRAT 3~ 480 RNRA 4,1 · DEPT 6800 0000 SFLU 3.4 SP. -21~06~5 ~R 114 ? RHOB 2.2012 NCNL 1935~0 N~T ~.74~0 RN.A 4.1 DEPT 6?00.0000 SFLU ~ 8 SP- -34.5313 OR 114~3 ~0~ 2,4492 NCNL 1980.0 ~R~T 3,7637 ~NRA 4,1 199 500 000 083 766 500 000 083 359 125 000 159 NPH! FC~L GR NPHI FCNL FCNJj 49. 471, 114, 471, ~4. 47. 487. ~4, 9629 5605 0000 7500 1367 5605 0000 7500 1777 8027 2500 3125 DRHO CAbI IbD DRHO CALI DRHO CAbi 2'7207 0,1362 8,5000 2,7227 0,1362 7.2773 2.0684 0.1094 8.7734 ~VP 010,H02 VERiFICATIDN LISTING PAGE ~ · ,, 6600.0000 ~FbU -79,.3125 2,.46~9 NCNb 6~00,0000 SFLU 43.~31.3 2,3887 ~CNL 6400,0000 -44.81~5 ~,~4316 NCNL 3.4043 6~00,0000 ~., 2 ~CNL .7OSl 620o n0no srT.,u ~,3516 wCH[, 3.1035 6100, 0000 SFLU -42:91~5 ,.584o 6000,0000 -40,0313 ~i4109 3 2539 36 5313 3770 ~CNL ~ 7266 ~NRA 5800,0000 SFLH '3~.4688 ~CNL 3.4375 RN~A. 5700.0000 SFT, U -59~5938 3.9141 ~NPA 5600,0000 -33,n313 2.2734 3o1719 134.8750 I~M 40,4375 NPHI 2910.0000 5,.9~02 IBM 87,$ O0 NPMI 2560.0000 FCNL ].~867 GR · ~,8340 !00,7500 NPHI 1669,0000 rCNb 3.7639 2,.0332 128,6250 NPHI 191~.0000 ~CNL 3B~.7500 202 .0000 3,3735 6,4258 12~.~500 2056,0000 FCNL 3.3333 4.52~3 IbM 11~.5625 NPH! 1978 0000 FCNL 2 7402 IbM 144:8750 NPH! 2064,0000 FCNL 4.4000 4.4336 3.3301 118.1250 NPHI 1963.0000 FCNL 4,]744 ~.~734 137,7500 NP~I ~014,0000 ~CNL 3.5683 95.0313 21,.2891 1289,0000 40,4375 5.5781 32,4219 78 0000 . : ooo 1,740~ 37. 953 434.~500 100,7500 2 0176 44!5801 465 5000 i29.6~90 34,q121 49R.2500 388.7500 9 685 5000 122:75.00 3.0586 36,~652 650,0000 111,5625 ~,3574 46,0449 430.0000 144.8750 ~.7695 40.6250 554.5000 127,6250 3 lO34 47:4~09 46~.7~00 118.1250 1.5820 36,6699 583,5000 137.7500 IbD DRHO CALl DRHO CALI DRHO CAI,! ILD.. DRHO CALl ILD.. DRHO CALI DRHO CALI DRHO CALl CALI DR~O CALI DRHO CALl ILD.. DRHO CALl 52,4688 0.,0952 8,3984 5.~773 0, 078 8.9062 1,6699 1~"1313 '4609 10,2656 ,6846 -9,0132 .4609 2 8203 0~:0957 9,8516 3 0781 10 000 2.2910 -0.0029 9.5313 2 6680 0i0693 9 6875 3,22n7 0,0200 11.2187 1,4551 0,0254 9.1172 ,VP 010,M02 VE~TFICATION LISTING PAGE )EPT 5~00.,0000 8FLU {P.. 71,,31~5 ~HOB 2,3730 NCNL )TUT 5{00 0000 ;P. -16]:3750 GR ~HOB 2,44]4 NCNL )E~T 5300 0000 SFLU ~HOB 2.7965 ~)CNL ~R~T 3. 52,3 DNRA )EPT 510n,O000 SFLU ~HOB ~.3945 NCNL ~T ~,1.348 . )~PT 5000 0000 ~P~ -126i4375 m~O~ ? 34]8 NCNL ~RAT 3.0645 )EPT 4900,0000 SFLU {P,~ -'129.1250 ~HOB ~,.30~7 ~CNL ~.~T 3.3945 )~PT i~00,O000 SFLI.! ~P- .31,6250 ~OB 2,2910 ~R~T 2.9844 RN~A )EPT 4700.0000 SFLU ~P. -129.6250 ~AT 3.~1~5 5P.. -131.5000 ~HOB 2.2871 ~CNL U~aT 3.4473 9EDT ~500.0000 SP. 133,7500 1.7539 IbM 149.'8750 NPMI 183~.0000 FCNL 4.523B ,  35~6 IBM 18 ~0000 NPHI 1826.0000 FCNL 3.9396 ~ 1.699 84 6875 NPHI 2460 0000 FCNb 3 6433 13 1250 NPHI 2272.0000 FCNL 4,3434 91,5000 2080,0000 FCNL 3,4262 2,7109 ~LM 10~,0625 NPMI ~72,0000 ~C~L 3,1651 3,653~ ~o4961 104,3750 NPHI 2216,0000 FCNL 2,4063 7~,7500 NPM1 2506,0000 FCML 2'45?0 97.5000 26o.oooo 3,9273 GR ~ 5215 4 ,~9004 37~ 0000 14:8750 2.7383 46 500 188,0000 2 ~621 35~ 074 61.5,0000 84,6875 4 8262 53 0000 138,1~50 2,4785 34,7168 673,5000 91,5000 2,617~ 33,1543 738.0000 102,0625 39,5020 644.5000 95,56~5 2,5313 31,6406 599,0000 104,3750 2 5176 3717441. 656,~000 78,7500 2,3770 40,1367 535,0000 97.5000 3~,1_836 573,5000 DRMO CAb! TLD DRMO CALl ILD DRMO CA[,I DRHO CAL! DRHO CALl IUD., DRHO CILI DRHO CALl ILD DRHO CALl DRHO C~U! DR~O CALl DRHO CALl 1, 844 9,6094 2 7734 0~0747 10,3984 2 1387 0:0420 9,9609 2,6582 27 2,~313 0, 781 9.9844 2.6602 0.0~66 9.8906 2 5801 0i0220 10 1719 2,5723 0,0166 10,1172 2,4004 0 0303 10:1016 2.3867 -0,0093 10,0313 ,VP 010.H02 VE~IFTCAT[O~ bISTTNG PAGE 6 3~3301 RN~A 3,7883 GR 133.~7,0 GR i07,9375 ~ 23, .676 NCNb 195~,0000 rCNL .6699 ~NRA ,78~2 GR 4309 0000 8FL[! 2..S156 IbM -13~:2500 GR 95 8750 NPHI 2.2695 NCNb 1969:0000 FCNL 3.40~2 nNRA 3,65~3 -136~ 1.250 CR 87,1875 NPHI 2 2598 NCNb 1940.0000 FCN[, -136, 750 GR 7 i: 750 NPHI  2480 NCNb 1714,0000 FCNL · ~-..,3415 NCNb 2007.0000 FCNI, 3.6875 ~NRA 3.~754 ~900 0000 SFLU 212266 2 2754 NCNb 187~ 0000 FCNL 3800,0000 SFLU 2,6484 IbM -137,0000 gR 90.2500 NPHI 2,,~695 NCNb 1791,0000 3.4863 O~PA 3.6052 · 3700 0000 SFLU 2.79~0 -140:7500 ~R 9~,8750 2.3027 ~CNb 1862,0000 FCNL 3,6855 RN~A 4"1203 3600.0000 SFLU 9,27i5 -141.8750 Ga 81.0000 2.~i$7 ~CNL 181~.0000 rCNL 3,33~8 nNOA 3.8781 3500'0000 $rt,U 3.1035 -147.3750 gR 83.9000 ~ 2461 NCNL 2017,0000 FCNb 3:3!64 RNRA 3,6232 3400~0000 SrI.,U 3.38~7 -~46o3750 GR 78.5000 106.8125 ~.1543 44.1895 51~.2500 16 .937S 2,716~ 40.1367 60 0000 ~.5605 40.4785 507,~500 87.1875 ?5O 2,7617 43.3594 472.~500 107.5625 2 3867 37!9883 573 SO00 96 S000 2.3379 39.6484 537.0000 00.2500 · ~1~9 488,9000 95.8750 3.1484 36.9629 8!.0000 3.1953 36.4258 49~.5000 83.5000 3.9121 40.5273 ILD DRHO ILD CALI ILD DRHO CALI ILD.. DRHO CALI DRHD CALI DRMO CALI DRHO DRHO DRHO C~LI ILD DRHO DRHO 2.2090 0,0195 10.1172 , ~..8086 ,0576 9.6406 2,6445 ,o195 I ,0313 3 84 10,3516 2 8789 11. 125 2,4727 0,0259 lt.2ogl 2.4434 0.0186 11.4375 3.t328 0.0337 11,4375 3.6309 O.O464 11.5234 3,3825 0.0698 11.7734 4,2383 0.0503 ,VP 010.H02 VERIFICATION LISTING PAGK 7 ~HOB 2.1875 NCNI, ~T 3.537! RN~A )E T 3 0o 0000 ~P. -164113750 GR' ~RAT 3.6641 ~e,T 3200 0000 . ~P. -163.6250 ~OB 2.2578 ~CNL 3EPT 3~00.,0000 ~FLU SP. -{77~,2500 GR {ROB 2.1699 ~]CNL 9EPT 3000 ~000 ~FLU RHOB 2.~85~ ~CNL 9KPT 2900. 0000 ~P, -16&i5000 RHOB 2. 0371 ~CNL ~RRT 3.~996 OEPT 2~00,0000 SP. -156 9750 RHO~ 2!0742 NCNL ~RRT ~ 8906 DEPT ~700.0000 SFLU RHOB ~, 084:0 ~CNL ~P~T ~7427 RNRA $P. ' 177,0000 GR DEPT ~500, 00~0 SFLU SP. 160:5000 ~OR 2.1582 NCNL ~AT 3,9242 ~NRA ~EPT ~400.0000 $P. 158.1.250 RWOF 2.0098 NCNL ~R,~T 4.21~7 RNRA D~PT 2300.0000 10.5469 ILM 66,~0.00 NPHI 2022, O00 FC~L 4,~6i6 ~i:9375 NP,I 19 .0000 3,8186 GR 11,~906 7,5352 73,5625 NPH! 1628.0000 FCNL 4.2038 5 6250 NPHI 0000 FCN[, 1733.8564 6,9062 83,5625 ~PHI 1637.0000 FC~L 4,1922 GR 10'453i 45.6563 1567.0000 FCNL 4.]596 16'7188 40,3438 NPNI 2561 GR 74,1875 NPRI ~556,0000 FCNL 4,1068 6,04)0 61,0000 1709,0000 FCNL 4,5362 GR ~4,64~4 509.7500 7~.5000 457 481,2500 66,5000 8,,6875 39,9160 518'0000 73.9375 ,, I0,593~ 43,457 4442500 7 4805 44:8730 415.2500 73.56~5 1 ~R9 41: 436 7500 53:6250 7,425~ 46 5820 391~0000 83.56~5 13,6328 ,4570 45,6563 15,6406 4~.1914 40:5000 40,3439 8,2422 45.1172 38q.0000 74.1875 7.5781 52.6367 398.7500 61.0000 14.5000 CALl DRHO CALI ILO, DRHO CALI ~RH0 CALl T[~D DRHO CALI CASI DRHO C~5I DRHO CALX ILD, DRHO CALl ILD.. DRHO C~LI 11.5234 9.6094 10,5156 9,4766 0,0381 I0,9922 1A.5469 .01~! 12,8594 8 1797 0:0967 13,2'500 12,7500 0,080! 11,2422 8,'3984 12. 641, 15..,1719 0,0889 13.1641 17.8594 0.0684 13.8203 o 4219 0'0259 12:6953 8,828! 0.0005 11.8047 14.9219 ,VD OlO.M02 VERIFICATION LISTING PAGE 8 ~P.. -,177.8750 CR 43 1875 NPHI ~OB 9.~332 NCNL 1766:0000 FCNL $000 GR 29,4063 ~.~P~! 8408 ~("NB 1276.0000 FCNL 4."t461 ~N~A 5.1870 GR 'ILE NA~E :ED?T .001 ~ERVICE ~A~E ~ERSION ~ IA~I~U~ LENGTH ~ 10~4 , 'I[.,~ TYPE 46 5332 DRHO 4).1875 2000.0000 ILD~ 6~.136~ DRHO ~60.0000 CAL! 29.4063 ~,2813 .5308 9.0234 ;ERVICE N~ME :EDIT )ATE )RIGIN :0000 ~APE ~A~ ~, ~8590 ~ONTINUATI~N # :01 ~EWT T~PE,,Na~E ~O~E~TS :LIBRARY TAPE ~EEI., TRAILER ** ~ERVICE NAME :EDIT :83/10/10 J~IGIN : ~ONTIN{IATION # :01 ~fl~ME~TS :LIBRARY TAPE EOF EOF