Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout215-0047. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU X-10A OA Downsqueeze Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 215-004 50-029-20467-01-00 13032 Conductor Surface Intermediate Liner Production Tieback Liner 8984 81 2641 8731 10601 3075 12700 20" x 30" 13-3/8" 9-5/8" 7" 3-1/2" x 3-1/4" x 2-7/8" 8985 37 - 118 36 - 2677 1702 - 10433 34 - 10635 9957 - 13032 37 - 118 36 - 2677 1702 - 8756 34 - 8910 8386 - 8984 12690, 12864 2670 4760 5410 10530 12700 5380 6870 7240 10160 10720 - 12870 4-1/2" 12.6# 13cr85 33 - 10006 8974 - 8984 Structural 4-1/2" HES TNT Packer 9794 8526 Torin Roschinger Operations Manager Finn Oestgaard finn.oestgaard@hilcorp.com 907-564-5026 PRUDHOE BAY, Prudhoe Oil Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028313, 0047475 33 - 8425 OA at Surface Pump 1-gallon of Welllock. Final squeeze pressure = 1960-psi. 240 394 332 947 6165 5823 1700 1680 256 287 325-250 13b. Pools active after work:Prudhoe Oil No SSSV Installed 9794, 8526 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 9:29 am, Aug 15, 2025 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2025.08.15 04:26:43 - 08'00' Torin Roschinger (4662) RBDMS JSB 081925 J.Lau 11/4/25 DSR-9/11/25 ACTIVITY DATE SUMMARY 6/4/2025 T/I/O = SSV/800/300. Temp = SI. Bleed IAP/OAP to 0 psi (pre well lock). ALP = 1940 psi, SI @ CV & LV. OA cemented to surface. IA FL @ 3227' (sta # 5, Dome). Bled AL spool to LV to 0 psi, LV appears to be leaking by, starting to see pressure regain on AL spool. Bled IAP to OT to 0+ psi in 4 hrs, during first 45 min of bleed IA FL appeared to in flow (foam) 430' to 2790''. Choke back bleed rate and monitor FL through out bleed. IA FL @ 3227'. Bled left & right side OAP to 0 psi in < 1 min (gas). Monitored for 30 min. IAP increased 0+ & IA FL unchanged.. OAP increased 60 psi on left side & 0+ psi on right side. Final WHPs = SSV/0+/0+ SV, WV, SSV = C. MV = C. IA, OA = OTG. 02:30 6/5/2025 T/I/O = SSV/0/0+. Temp = SI. OA Wellock Re-treat prep. ALP = 1860 psi, SI @ CV. Bled OAP to 0 psi. Removed OA risers and began drilling out old wellock from risers. Will take an extended amount of time to complete, taking risers to shop and will return when complete. Installed Needle valves with gauges installed on 1" OA ports. Final WHPs = SSV/0/0. SV, WV, SSV = C. MV = O. IA, OA = OTG. 11:00 6/7/2025 T/I/O = SSV/60/0+. Temp = SI. Bleed IAP, install OA riser. ALP = 2000, SI @ CV & LV. Grease crew serviced AL CV & LV. IA FL @ 3227' (sta # 5 dome). Bled IAP to BT to 0 psi in 1 hr. Installed 1" riser on modified OA @ 11:00 & 01:00, PT'd to 2000 psi w/ N2 (PASSED). Bled OAP to 0 psi. Final WHPs = SSV/60/0+. SV, WV, SSV = C. MV = O. IA, OA = OTG. 17:30 6/8/2025 T/I/O = SSV/20/0. Temp = SI. Wellock OA. ALP = 1960 psi, SI @ CV. IA FL @ 3727' (sta # 5 dome). Bled IAP to 0 psi in 2 hrs. Held open bleed for 4 hrs. Pressured OAP to 2500 psi w/ Wellock squeezing for 5 hrs. Pumped a total of 1 gallon of Well Lock. CNG rigged up to AL to hold 1960 psi on OA while Wellock cures. Final WHPs = SSV/0/0. SV, WV, SSV = C. MV = O. IA, OA = OTG. 16:00 6/9/2025 T/I/O = SSV/0+/1960. Temp = SI. Eval well lock, hold open bleed on IA. ALP = 1960 psi, SI @ CV. Heater installed in well house. IA FL @ 3727' ( sta # 5 Dome). Bled IAP to 0 psi in 10 min, hold open bleed on IAP for 1.5 hrs. CNG rigged up from AL to OA holding 1960 psi squeeze on Well Lock. Check well lock & IAP after 14 hrs. IAP increased 20 psi. Bled IAP to 0 psi in 20 min, held open bleed on IA for 1 hr. 1960 psi squeeze on OA Well lock. Heater installed in well house, working properly & well house doors left open. Well Lock sample is thick but still liquid. Final WHPs = SSV/0/1960. SV, WV, SSV = C. MV = O. IA,OA = OTG. 22:00 6/10/2025 T/I/O = SSV/20/1960. Temp = SI. Eval Well Lock/open bleed IAP. ALP = 1960 psi, SI @ CV. Heater installed in well house and working. 6" deep ground water in cellar, ~ 1' from OA riser. measured @ 11:00. IA FL @ 3727' (sta # 5 Dome). Bled IAP to BT to 0 psi in 20 min, held open bleed on IAP for 1 hr. CNG hose rigged up from AL to OA squeezing 1960 psi on Well Lock. Well house doors left open, Well Lock sample has started to set. Final WHPs = SSV/0/1960. SV, WV, SSV = C. MV = O. IA,OA = OTG. 22:00 Daily Report of Well Operations PBU X-10A Daily Report of Well Operations PBU X-10A 6/11/2025 T/I/O = SSV/20/1960. Temp = SI. Eval Well Lock/open bleed IAP. ALP = 1960 psi, SI @ CV. Heater installed in well house and working. 14" deep ground water in cellar, ~'4 " from OA riser. measured @ 11:00. IA FL @ 3727' (sta # 5 Dome). Bled IAP to BT to 0 psi in 20 min, held open bleed on IAP for 1 hr. CNG hose rigged up from AL to OA squeezing 1960 psi on Well Lock. Well house doors left open, Well Lock sample has started to set, thick and tacky. Left jewelry for OA risers next to SSV panel. Final WHPs = SSV/0/1960. SV, WV, SSV = C. MV = O. IA,OA = OTG. 15:30 6/12/2025 T/I/O = SSV/10/1960. Temp = SI. Eval Well Lock/open bleed IAP. ALP = 1960 psi, SI @ CV. Heater installed in well house and working properly. Vac truck removed water from cellar. 1/2" deep ground water remained in cellar ~ 15" from OA riser. Measured @ 11:00. IA FL @ 3727' (sta # 5 Dome). Bled IAP to BT to 0 psi in 10 min, held open bleed on IAP for 30 min. CNG hose rigged up from AL to OA squeezing 1960 psi on Well Lock. Well house doors left open, Well Lock sample has started to set. Final WHPs = SSV/0/1960. SV, WV, SSV = C. MV = O. IA,OA = OTG. 01:00 6/12/2025 T/I/O = SSV/20/1960. Temp = SI. Eval Well Lock/ Bleed IAP. ALP = 1960 psi, SI @ CV. Heater installed in well house and working properly, well house doors left open. CNG hose rigged up from AL to OA applying 1960 psi on Well Lock. Well Lock sample is still somewhat soft. Called de-watering Vac truck (H# 4874) to have water removed from the cellar, they put it on their list. Water is ~31" deep at 6:00 position (~29" from top of floor kit). Measured @ 22:00 hrs. IA FL @ 3227' (sta # 5 Dome). Bled IAP to BT from 20 psi to 0 psi in 15 min, held open bleed on IA for additional 30 min. Final WHPs = SSV/0/1960. SV, WV, SSV = C. MV = O. IA,OA = OTG. 23:00 6/13/2025 T/I/O = SSV/20/1960. Temp = SI. Eval Well Lock/ Bleed IAP. ALP = 1960 psi, SI @ CV. Heater installed in well house and working properly, well house doors left open. CNG hose rigged up from AL to OA applying 1960 psi on Well Lock. Well Lock sample is still somewhat soft. Water is ~24" deep at 6:00 position Measured @ 07:40 hrs. IA FL @ 3227' (sta # 5 Dome). Bled IAP to BT from 20 psi to 0 psi in 25 min, (gas) Final WHPs = SSV/0/1960. SV, WV, SSV = C. MV = O. IA,OA = OTG. 08:30 6/13/2025 T/I/O = SSV/15/1930. Temp = SI. Eval Well Lock/ Bleed IAP. ALP = 1930 psi, SI @ CV. Heater installed in well house and working properly, well house doors left open. CNG hose rigged up from AL to OA applying 1930 psi on Well Lock (gauge on left side was reading 1150 psi, swapped out gauge). Well Lock sample is solid. Called de-watering Vac truck (H# 4874), it is on their list to remove the water. Water is ~36" deep at 6:00 position. Measured @ 21:30 hrs. IA FL @ 3227' (sta # 5 Dome). Bled IAP to BT from 15 psi to 0 psi in 15 min, held open bleed on IA for additional 30 min. Final WHPs = SSV/0/1930. SV, WV, SSV = C. MV = O. IA,OA = OTG. 22:30 Daily Report of Well Operations PBU X-10A 6/14/2025 T/I/O = SSV/10/1960. Temp = SI. Eval Well Lock/ Bleed IAP. ALP = 1960 psi, SI @ CV. Heater installed in well house and working properly, well house doors left open. CNG hose rigged up from AL to OA applying 1960 psi on Well Lock. Well Lock sample is hard. Water is ~24" deep at 6:00 position Measured @ 07:45 hrs. IA FL @ 3227' (sta # 5 Dome). Bled IAP to BT from 20 psi to 0 psi in 23 min, (gas) Final WHPs = SSV/0/1960. SV, WV, SSV = C. MV = O. IA,OA = OTG. 08:30 6/14/2025 T/I/O = SSV/10/1950. Temp = SI. Eval Well Lock/ Bleed IAP. ALP = 1950 psi, SI @ CV. Heater installed in well house and working properly, well house doors left open. CNG hose rigged up from AL to OA applying 1950 psi on Well Lock. Well Lock sample is solid.. Water is ~28" deep at 12:00 position. Measured @ 20:30 hrs. IA FL @ 1365' (1862' above sta # 5 Dome, 25 bbls). Bled IAP to BT from 10 psi to 0 psi in 5 min, held open bleed on IA for additional 30 min. Final WHPs = SSV/0/1950. SV, WV, SSV = C. MV = O. IA,OA = OTG. 21:30 6/15/2025 T/I/O = SSV/10/1960. Temp = SI. Eval Well Lock/ Bleed IAP. ALP = 1960 psi, SI @ CV. Heater installed in well house and working properly, well house doors left open. CNG hose rigged up from AL to OA applying 1960 psi on Well Lock. Well Lock sample is hard. Water is ~24" deep at 6:00 position Measured @ 08:00 hrs. IA FL @ ( 1862 above' sta # 5 Dome). Bled IAP to BT from 10 psi to 0 psi in 21 min, (gas) Final WHPs = SSV/0/1960. SV, WV, SSV = C. MV = O. IA, OA = OTG. 09:00 6/16/2025 T/I/O = SSV/20/1960. Temp = SI. Bleed IAP (Wellock). ALP = 1960 psi, SI @ CV. CNG accumulator rigged up from the AL to OA risers. Heater working properly. Wellock sample set up, removed from wellhouse. IA FL @ 1360' (8250' above sta # 1 SO). Bled IAP to BT to 0 psi in 1.25 hrs. No monitor. Final WHPs = SSV/0/1960. SV, WV, SSV = C. MV = O. IA, OA = OTG. 13:00 6/17/2025 T/I/O = SSV/20/1960. Temp = SI. Bleed IAP (Wellock). ALP = 1960 psi, SI @ CV. CNG accumulator rigged up from the AL to OA risers. Heater working properly. Wellock sample set up, IA FL @ 1360' (8250' above sta # 1 SO). Bled IAP to BT to 0 psi in 40 min No monitor. Final WHPs = SSV/0/1960. SV, WV, SSV = C. MV = O. IA, OA = OTG. 17:00 6/18/2025 T/I/O = SSV/20/1960. Temp = SI. Bleed IAP (Wellock). ALP = 1960 psi, SI @ CV. Swapped CNG accumulator from AL to two separate hoses pressured up to 1740 psi o each OA riser. Heater working properly. IA FL @ 1360' (8250' above sta # 1 SO). Bled IAP to BT to 0 psi in 35 min. No monitor. Final WHPs = SSV/0/1740. SV, WV, SSV = C. MV = O. IA, OA = OTG. 12:00 6/19/2025 T/I/O = SSV/20/1500. Temp = SI. Bleed OAP (Wellock). ALP = 1960 psi, SI @ CV. Swapped CNG accumulator from AL to two separate hoses pressured up to 1500 psi @ 11 oclock 1000 psi @ 1 oclock on each OA riser. Heater working properly. IA FL @ 1360' (8250' above sta # 1 SO). Bled IAP to BT to 0 psi in 50 min. Final WHPs = SSV/0/1500. SV, WV, SSV = C. MV = O. IA, OA = OTG. 16:00 Daily Report of Well Operations PBU X-10A 6/20/2025 T/I/O = SSV/10/1340. Temp = SI. Eval Wellock/ Bleed IAP (post Wellock). ALP = 1730 psi, SI @ CV. CNG accumulator on each OA riser (L= 500 psi, R = 1360 psi upon arrival), pressured L OA riser to 1520 psi, R OA riser remains 1360 psi. IA FL @ 1340' (8270' above sta # 1 SO). Bled IAP to BT to 0 psi in 30 min. No monitor. Final WHPs = SSV/0/1520. SV, WV, SSV = C. MV = O. IA, OA = OTG. 05:00 6/21/2025 T/I/O = SSV/20/400. Temp = SI. Bleed OAP (Post well lock). RD CNG accumulator hoses from OA. Gauges were reading inaccurate pressures due to being wellocked (gauges stuck @ 400 psi). Replaced wellocked jewelry and installed Ops gauges. Final WHPs = SSV/20/0 SV = C. WV, SSV, MV = O. IA, OA = OTG. 14:00 7/4/2025 T/I/O = 280/1670/0. Temp = 151°. Eval Well Lock. ALP = 1660 psi, online. Both OA risers read 0 psi. Dark water in cellar, ~ 33' deep. SV = C. WV, SSV, MV = O. IA, OA = OTG. 05:15 7/12/2025 Well Shut In 7/14/2025 T/I/O = SSV/1850/0+. Temp = SI. WHP's (post Wellock). ALP = 10 psi, SI @ CV. OA riser @ 11:00 = 0+ psi. OA riser @ 01:00 = 1500 psi, Bled OAP to 0 psi in < 5 sec. Held open bleed for 10 min. Monitored for 30 min. OA riser @ 01:00 increased 1200 psi. Final WHP's = SSV/1850/0+. SV, WV, SSV = C. MV = O. IA, OA = OTG. 16:30 7/26/2025 Well Pop'd 7/26/2025 T/I/O = 300/1680/0+. Temp = 136°. Bleed OAP (Eval IAxOA). ALP = 1680 psi. OA riser (L = 0+ psi R = 570 psi). IA FL @ 9610', (Sta # 1 SO). Bled OAP to 0 psi no gas & no fluid. FWHP's = 300/1680/0. SV = C. WV, SSV, MV = O. IA, OA = OTG. 11:00 7/28/2025 T/I/O = 260/1650/0. Temp = 148°. WHPs Check OA riser pressure. ALP = 1650, online. Left OA riser, 0 psi & right OA riser 0+ psi. 6" of ground water in cellar, measured @ 12:00. SV = C. WV, SSV, MV = O. IA, OA = OTG. 22:30 7/31/2025 T/I/O = 300/1650/0. Temp = 150°. WHPs Check OA riser pressure. ALP = 1650 psi, online. Left OA riser, 0 psi. Right OA riser 0+ psi. SV = C. WV, SSV, MV = O. IA, OA = OTG. 21:15 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in this pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU X-10A OA Downsqueeze Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 215-004 50-029-20467-01-00 341J ADL 0028313, 0047475 13032 Conductor Surface Intermediate Liner Production Tieback Liner 8984 81 2641 8731 10601 3075 12700 20" x 30" 13-3/8" 9-5/8" 7" 3-1/2" x 3-1/4" x 2-7/8" 8985 37 - 118 36 - 2677 1702 - 10433 34 - 10635 9957 - 13032 2500 37 - 118 36 - 2677 1702 - 8756 34 - 8910 8386 - 8984 12690, 12864 2670 4760 5410 10530 12700 5380 6870 7240 10160 10720 - 12870 4-1/2" 12.6# 13cr85 33 - 100068974 - 8984 Structural 4-1/2" HES TNT Packer No SSSV Installed 9794, 8526 Date: Torin Roschinger Operations Manager Finn Oestgaard finn.oestgaard@hilcorp.com 907-564-5026 PRUDHOE BAY 5/7/2025 Current Pools: Prudhoe Oil Proposed Pools: Prudhoe Oil Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 12:09 pm, Apr 23, 2025 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2025.04.23 11:51:25 - 08'00' Torin Roschinger (4662) 325-250 JJL 4/23/25 A.Dewhurst 24APR25 10-404 DSR-4/25/25*&: Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2025.04.25 16:51:56 -08'00'04/25/25 RBDMS JSB 042825 Page 1 of 2 WWell:XX--110A WWellLock Retreat Well Name:X-10A API Number::50--029--20467--01 Current Status::Offline Not Operable Pad::X PAD Regulatory Contact:Abbie Barker Job Type:Wellhead Repair First Call Engineer:Finn Oestgaard Phone:(907) 350-8420 Second Call EEngineer:Leif Knatterud Phone:(432) 227-4342 Current Bottom Hole Pressure:3,300 psi (Estimated based on average Ivishak BHP) MPSP:2,500 psi (Estimated from BHP- .1psi/ft gas gradient+ safety factor) Max Dev:106 deg @ 11,062’ MD Min ID:2.37” @ 9,950’ MD Expected POP Rates 150 BOPD, 4,000 BWPD, 2.5 MMSCFD Background: X-10A is a gas lifted well currently SI due to OA re-pressurization. May 2013 a RWO was executed to cut and pull the 9-5/8” casing from 1,702’. A 7” tieback was installed and the 7” x 9-5/8” x 13-3/8” was cemented to surface. The 7” has a slip-lock wellhead at surface. LEL’s were detected above the conductor in 2023 and the well was SI and made not operable. October 2024 a wellhead repair was executed where essentially the 13-3/8” was cut away 20” below the bottom flange of the wellhead and a cap was welded containing the cemented OA. The well was POP’d post repair and showed signs of re- pressurzation. A WellLock treatment was pumped 12/20, 7 gallons total to a max treatment pressure of 1400 psi before locking up. A follow up retreat was pumped 1/24/25, ¼ gallon was pumped @ a treatment pressure of 2500 psi for 30 minutes followed by sustained cure pressure of 1500 psi. Upon POP’ing the OA pressure was stable until the heater was removed from the wellhouse, OA pressure would then increase. After the UE flowback period it was decided to shut the well in due to pressure still building up. Objective: Retreat OA with WellLock Procedure: DHD – Heater required in wellhouse multiple days in advance of treatment to get everything to a warm constant temperature. 1. Blead pressure off OA gauge risers if > 0 psi. 2. Remove pressure gauge risers @ from OA cap. 3. Remove as much WellLock as possible accessing from the pressure riser bung 4. Re-install OA gauge risers & PT to 1,000 psi with Nitrogen. - Monitor for external leaks. - Previous PT post top hat installation to 1,000 psi saw pressure decrease to 540 psi in 15 minutes with no external leaks detected. 5. Pump WellLock retreatment to a treatment pressure of a minimum of 1000 psi – Discuss with OE prior to determine treatment pressure and duration along with cure pressure. - UT data from 11/25/24 of 7” showed lowest wall thickness reading to be 0.349” v 0.408” nominal (115% wall loss, derated collapse = 4774 psi) & 13-3/8” to be 0.478” v 0.514” nominal (77% wall loss, derated burst = 4,003 psi) 6. After Sample has set up, POP U/E & Monitor & bleed as necessary for 28 days. 7. Retreat with WellLock if necessary. Attachments: x Wellbore Schematic x Sundry Change Form Page 2 of 2 WWell:XX--110A WWellLock Retreat Hilcorp North Slope, LLCHilcorp North Slope, LLCChanges to Approved Work Over Sundry ProcedureDate: April 23,2025Subject: Changes to Approved Sundry Procedure for Well X-10ASundry #:Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to theAOGCC by the workover (WO) “first call” engineer. AOGCC written approval of the change is required before implementing the change.StepPageDate Procedure ChangeHNSPreparedBy (Initials)HNSApprovedBy (Initials)AOGCC WrittenApproval Received(Person and Date)Approval:Asset Team Operations Manager DatePrepared:First Call Operations Engineer Date 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU X-10A Surface Csg Weld, OA Downsqueeze Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 215-004 50-029-20467-01-00 13032 Conductor Surface Intermediate Liner Production Tieback Liner 8984 81 2641 8731 10601 3075 12700 20" x 30" 13-3/8" 9-5/8" 7" 3-1/2" x 3-1/4" x 2-7/8" 8985 37 - 118 36 - 2677 1702 - 10433 34 - 10635 9957 - 13032 37 - 118 36 - 2677 1702 - 8756 34 - 8910 8386 - 8984 12690, 12864 2670 4760 5410 10530 12700 5380 6870 7240 10160 10720 - 12870 4-1/2" 12.6# 13cr85 33 - 10006 8974 - 8984 Structural 4-1/2" HES TNT Packer 9794 8526 Torin Roschinger Operations Manager Finn Oestgaard finn.oestgaard@hilcorp.com 907.564.5026 PRUDHOE BAY, Prudhoe Oil Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028313, 0047475 33 - 8425 OA at surface 7-gallons of Welllock; 3/4-gallon of Wellock. Final pressure = 0-psi 151 240 439 332 5934 6165 1687 1700 269 256 324-504, 324-693 13b. Pools active after work:Prudhoe Oil No SSSV Installed 9794, 8526 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 8:22 am, Mar 12, 2025 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2025.03.11 21:51:13 - 08'00' Torin Roschinger (4662) JJL 4/9/25 DSR-3/24/25 RBDMS JSB 060325 ACTIVITY DATE SUMMARY 9/23/2024 ***WELL S/I ON ARRIVAL*** RAN 2' x1-7/8'' STEM, 4-1/2'' BLB, 3805' G-RING, TAG LTP @ 9950' MD, MADE MULTI BRUSH PASSES ACROSS X-NIPS @ 9917' MD & 9770' MD STBY FOR PUMP TRUCK & FLUIDS ***WSR CONT ON 9-24-24*** 9/23/2024 MI SU PJSM, RU ***Job Continued 9-24-24*** 9/24/2024 ***Job Continued from 9-23-24*** T/I=375/0 ( WELLHEAD REPAIR ) Assist Slickline. Speared in w/ 5 bbls 60/40 dowin IA. Pumped 254 bbls SW down IA. FP IA 49 bbls crude. Pumped 5bbls 60/40 down TBG. Pumped 250 bbls SW down TBG. Pumped 28 bbls Crude followed by 10 bbls 60/40 down TBG for FP. Pump 19 bbls Diesel for MIT-TxIA Pressure up to 2753/2760 psi. First 15 min loss of 28/28 psi. Second 15 min loss of 22/22 psi. Third 15 min loss 21/20 psi. Fourth 15 min loss 17/18 psi. Bled back 3.2 bbls **PASSED** Slickline in control of well upon departure. 9/24/2024 ***WSR CONT FROM 9-23-24*** LRS PUMPED 250 BBLS SEA WATER DOWN IA w/ 49 BBLS CRUDE FP LRS PUMPED 250 BBLS SEA WATER DOWN TBG w/ 38 BBLS CRUDE FP SET 4-1/2" PX PLUG BODY IN X-NIP @ 9917' MD RAN 4-1/2" CHECK SET TO PX PLUG BODY @ 9917' MD (sheared) SET P-PRONG IN PX PLUG BODY @ 9917' MD (96" oal, 1.75" FN) LRS PERFORMED PASSING C-MIT TxIA *(see LRS log)* ***WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED OF WELL STATUS*** 10/14/2024 SSV/60. Temp = SI. Bleed IAP (pre SC weld). Flowline, AL, wellhouse, and grating removed. Plywood installed over cellar. IA FL @ surface. Bled IAP to BT to 0 psi in 40 min (0.25 bbls). Monitored for 30 min. IAP unchanged. Final WHPs = SSV/0. SV, WV, SSV = C. MV = O. IA = OTG. 16:30 10/22/2024 T/I= SSV/0+. Temp=SI. WellHead Repair. Excavate cellar down to 47" below grade. Place wellhouse back over the well to shelter against winter weather. Cellar inflowed 10" of water after excavation. Evacuated water from cellar before leaving location. SV, WV, SSV=c. MV=O. IA=OTG. Job In prrogress. 10/23/2024 T/I = SSV/0+. Temp = SI. Evacuate IA fluid down ~4'. Flowline and AL disconnected. Well house floor removed, barriers around wellhouse.. Cellar has ice/water 10" deep. Installed integral flange on CV on 9 o'clock side. Evacueted IA fluid with N2, using hose trick (8' hose length). Strapped IA FL @ ~5' Sv, WV, SSV = C. MV = O. IA = OTG. 10/26/2024 T/I = SSV/ 10. Temp = SI. WHPs (WS request). Non Op well. Flowline and AL disconnected. Floor removed and barriers around wellhouse. IAP increased 10 psi. Cellar ice is getting thicker but not soild (11" deep). SV, WV, SSV = C. MV = O. IA = OTG. 16:30 Daily Report of Well Operations PBU X-10A Daily Report of Well Operations PBU X-10A 10/27/2024 T/I = SSV/ 10. Temp = SI. WHPs (WS request). Non Op well. Flowline and AL disconnected. Floor removed and barriers around wellhouse. Cellar ice is getting thicker but not soild (11" deep). Bled IAP to BT to 0 psi in <1 min (gas). Held open bleed for 2 hrs. Monitored for build up for 30 min. IAP unchanged. Final WHPs = SSV/0. SV, WV, SSV = C. MV = O. IA = OTG. 17:30 10/30/2024 T/I/O = SSV/4. Temp = SI. WHPs/Bleed IAP to 0 psi (pre hot work). Non Op. Flowline & AL disconnected. Floor removed and barriers placed around outside of wellhouse. Cellar ice is frozen solid (4" slab with ~8" water underneath). Bled IAP to BT to 0 psi in <1 min (gas). Held open bleed for 2.75 hrs. No monitor. Final WHPs = SSV/0. SV, WV, SSV = C. MV = O. IA, OA = OTG. 17:00 11/16/2024 T/I = SSV/4. Temp = SI. Bleed IAP to 0 psi (WS request). Flowline, AL disconnected, scaffold and grating removed. Integral installed on IA. Cellar floor is frozen solid. IA FL near surface. Bled IAP to BT to 0 psi in <1 min (gas). Held open bleed for 2 hrs. Monitored for build up for 30 min. IAP unchanged. Final WHPs = SSV/0. SV, WV, SSV = C. MV = O. IA = OTG. 05:00 11/25/2024 T/I= SSV/0+. TEMP=SI.Surface casing patch. Cut and remove insulated conductor with landing ring 34" below the bottom flange on the wellhead. Chipped and removed cement from around the 13-3/8" casing. Cut and remove the 13-3/8" casing with fluted centralizer 20" below the bottom flange of the wellhead. Chipped and removed cement from around the 7" casing. Dug out ~6" of cement down below the top of the 13-3/8" and 7" casings, cements was starting to look contaminated with a diesel smell. The elevation of the 13-3/8" casing will have 12" of space for the pre heat machine on either side of the weld areas. Had a UT pre weld inspection done on the weld areas of the 13-3/8" and 7' casing. The lowest reading on the 7" casing was .349" and the lowest reading on the 13-3/8" was.478" of wall thickness. UT reports and pictures to document are located in the Surface Casing Excavation & Weld Jobs folder. The fab shop made a stencil for the plate that will be welld from the 13-3/8 to the 7" casings. Job In progress. 11/26/2024 T/I = SSV/3. Temp + SI. Bleed IAP to 0 psi/ strap IA FL. Flowline, AL disconnected, scaffold and grating removed. Integral installed on IA. Bled IAP to BT to 0 psi in <1 min (gas). Held open bleed for 30 min. Monitored for build up for 30 min, IAP remained @ 0 psi. WS remove intragral flange. IA FL strapped @ ~66". 42" from center of IA CV to center of welders "wedding band". WS installed 2" flanged w/ jewelry. Final WHPs = SSV/0. SV, WV, SSV = C. MV = O. IA = OTG. 10:00 11/28/2024 T/I = SSV/3. Temp = SI. N2 purge (CSG weld). RU N2 purge to IA. Install N2 cap in IA (250 psi, purge N2/ gas to BT to 3 psi. No LEL @ BT. Welders fitted wedding rings and got QC's approval for location. Welded seems and got them UTed. Fitted up top plate and welded none online Welds. 11/29/2024 T/I = SSV/10. Temp = SI. N2 purge (CSG weld). Set up N2 purge for welding operations, maintain purge to BT keeping LEL below 20%. Initial LEL reading = 5.5%, mainained LEL's between 3.5% and 5.5% throughout the day. Welders wraped heater cords around well CSG for heating in the AM. SV, WV, SSV = C. MV = O. IA = OTG. 17:00. Daily Report of Well Operations PBU X-10A 11/30/2024 T/IA = SSV/10. Temp = SI. N2 purge (CSG weld). Set up N2 pruge for pre heat and welding operations. Initial LEL reading = 2.8%. Start heating surface CSG. After 1.5 hrs of heating the conductor started to off gas CO/H2S = Over Limit on 4 gas meter. Shut down heat/ clear personal. RU jewelry to cap fittings to vent gas-off fumes out side the well house, re-start heat. LEL's remain >3.4%. Welders welded first pass on top and bottom of cap, adjusted heat for cooling. Rigged back N2 purge. FWHP's = SSV/11. SV, WV, SSV = C. MV = O. IA = OTG. 18:30. 12/1/2024 T/I = SSV/8. Temp = SI. Hold N2 purge for welding (Assist SC repair). Set up N2 purge for pre heat and welding operations. Initial LEL reading = 3.0%. Weldwes started heating surface CSG, and proceded with welding. LEL's did not excede 3.5%. Welded top and bottom of the Wedding bands. Baked it for 2 hours, got the welds UTed and MTed. Welding complete, RD N2 purge, left 12 psi N2 cap on IA. Dry fitted Risers off of welded plate. 12/3/2024 T/I = SSV/10. Temp = SI. OA Integrity test (Post CSG weld). No AL. Slowly pressured conductor patch to 1000 psi w/ N2. No external leaks detected on 4 gas meter or using snoop. Pressure decreased 540 psi in 15 min, no external leaks detected. Bled conductor cap to 0 psi. SV, WV, SSV = C. MV = O. IA = OTG. 12:00. 12/6/2024 ***WELL S/I ON ARRIVAL*** R/U POL 61 RUNNING KJ, 3.50'' BELL GUIDE, 2-1/2'' JD (cont on next day) ***WSR CONT ON 12-7-24*** 12/7/2024 ***WSR CONT FROM 12-6-24*** PULLED P-PRONG FROM 9917' MD PULLED 3.81'' PX PLUG BODY FROM 9917' MD ***JOB COMPLETE, WELL LEFT S/I*** 12/8/2024 T/I/O = 280/1730/50. Temp = 148*. Eval IA xOA Com (OP's request). AL online @ 1760 psi. New OAP is climbing after well POP. OP's holding open bleed to BT upon arrival. SI OA bleed to obtain a BUR, 750 psi in 15 min. Opened OAP bleed, left open. OP's notified. SV = C. WV, SSV, MV = O. IA = O, OA = Open bleed to BT. 12:45. 12/20/2024 T/I/O = SSV/0/0. Temp = SI. Wellock OA. AL SI @ CV, 1760 psi. RD OA risers and RU jewlry to threadolet. Pumped 3 gallons of Wellock into OA to fill. Squeeze another 4 gallons of Wellock into OA to a max pressure of 1400 psi until OAP locked up. Jewelry left conected to threadolets with gauge to monitor pressure, OA risers left in WH. Heater in WH. SV = C. WV, SSV, MV = O. IA, OA = OTG. 17:30 12/21/2024 T/I/O = SSV/0/240. Temp = SI. Increase OAP to 1400 psi (Eval Wellock). ALP SI @ CV, 1900 psi. Heater not working, Non Mobile notified. Wellock setting up but not cured. Increased OAP to 1400 psi with ALP. Final WHPs = SSV/0/1400. SV, WV, SSV = C. MV = O. IA, OA = OTG. 15:30 Daily Report of Well Operations PBU X-10A 12/27/2024 T/I/O = SSV/0. Temp = SI. Wellock (Eval wellock). ALP = 1940 psi, SI @ CV. 740 psi on conductor cap. Wellock sample on well head appears to be cured. Heater in wellhouse and working propperly. SV, WV, SSV = C. MV = O. IA = OTG. 14:00. 12/28/2024 T/O = SSV/0, Temp = SI. Re-install jewelry on welded conductor cap. AL SI @ CV = 1940 psi. Removed Wellock jewelry from the conductor cap and installed risers. Wellock appears to be set-up inside cap. SV, WV, SSV = C MV = C. OA = OTG. 13:00. 1/4/2025 T/I/O = 320/1700/900. Temp = 136°. Bleed OA to 0 (OPS). ALP = 1720 psi online. Bled OAP from 900 psi to 0 psi < 1 min (gas). Monitor for 30 min. OAP increased 100 psi. final WHPs = 320/1700/100 SV = C. WV, SSV, MV = O. IA, OA = OTG 11:30 1/22/2025 T/I/O = 260/1710/0. Temp = 142°. Bleed IAP & OAP to 0 psi (pre-Well lock). ALP = 1800 psi, online. Ops SI well shortly after arrival. WHPs stacked out to 1650/1740 psi in 30 min. AL SI @ CV, ALP = 1940 psi. IA FL @ 9610' (sta #1, SO). AL CV leaking by. SI AL @ LV & flagged, bled ALP to 0 psi to LV. Bled IAP to OT from 1740 psi to 50 psi in 7 hrs. Monitored for 30 min. IAP & IA FL unchanged. Final WHPs = SSV/50/0. SV, WV, SSV = C. MV = O. IA = OTG. 18:00 1/23/2025 T/I/O = SSV/130/10. Temp = SI. Bleed IAP & OAP to 0 psi (pre-Well lock). AL SI @ CV & LV, ALP = 90 psi. Bled ALP to 0 psi to LV. Bled OAP to 0 psi in <1 min. Bled IAP to OT from 130 psi to 0 psi in 2 hrs. Maintained open bleed for 1 hr. SI & monitored for 30 min. IAP & OAP unchanged. Final WHPs = SSV/0/0. SV, WV, SSV = C. MV = O. IA, OA = OTG. 13:00 1/24/2025 T/I/O = SSV/0/250. Temp = SI. Wellock OA (re-treatment). ALP = 70 psi. AL SI @ CV & Lateral Valve. Bled OA to 0 psi. RD risers, installed Wellock jewelry. Pumped 1/4 gallon of Wellock into both sides of OA, held 2500 psi for 30 min on each side. Installed bottom portion of risers, pour another 1/2 gallon of Wellock and put together the rest of the OA risers, Jumper accumulator hose from AL on X-35 and pressure up OA to1500 psi with AL gas. Accumulator from X-35 in place. Heater in WH. Final WHPs SI/0/1500 SV, WV, SSV = C. MV = O. IA, OA = OTG. 13:30 1/25/2025 T/I/O = SI/0/350. Temp = SI. WHPs (post Wellock). ALP = 150 psi, SI @ CV & LV. Increase OAP to 1500 psi and re-charge accumulator. Heater in WH. Final WHPs = SI/0/1500. SV, WV, SSV = C. MV = O. IA, OA = OTG. 8:30 2/1/2025 T/I/O = SSV/0/1200. Temp = SI. WHPs (Post Wellock). ALP = 330 psi, SI @ CV. Heater in well house working properly. Sample in well house is firm. Increase OAP to 1500 psi from X-35 AL. Final WHPs = SSV/0/1500 SV, WV, SSV = C. MV = O. IA, OA = OTG. 14:00 2/2/2025 T/I/O = SSV/0/1000. Temp = SI. WHP's (Post Wellock). ALP = 370 psi, SI @ CV. Heater in Wellhouse. OAP was 1000 psi on the right riser and 0 psi on the left. Installed CNG hose jumper between sides and re-pressured both to 1500 psi from AL on X-35. Final WHP's SSV/0/1500 SV, WV, SSV = C. MVC = O. IA, OA = OTG. 17:30 Daily Report of Well Operations PBU X-10A 2/8/2025 T/I/O = SSV/0/250. Temp = SI. WHPs (Post Wellock). ALP = 380 psi, SI @ CV. Heater in well house working properly. Sample in well house appears to be fully cured. Rig down jumper hose. Close well house door and leave heater installed in well house. Final WHPs = SSV/0/250 SV, WV, SSV = C. MV = O. IA, OA = OTG. 14:00 " 2/17/2025 T/I/O = 280/1720/0. Temp = 140°. WHPs (Post Wellock). ALP online @ 1730 psi. OA riser @ 11:00 at 0 psi. OA riser @ 1:00 at 560 psi. Monitor for 30 min. OAP @ 11:00 unchanged. OAP @ 1:00 increased 90 psi. Notify WIC. Bled OAP @ 1:00 to 0 psi in < 10 sec. (all gas). Monitor for 30 min. OAP @ 1:00 increased 120 psi. DSO on lacation @ departure. Heater in well house working properly. Well house doors closed SV = C. WV, SSV,MV = O. IA, OA = OTG. 16:00 2/18/2025 T/I/O = 290/1720/60. Temp = SI. Eval Wellock. ALP = 1720 psi, online. Heater removed from WH and released. Sample on WH cured. SV = C. WV, SSV, MV = O. IA, OA = OTG. 15:30 2/28/2025 T/I/O = 280/1720/50. Temp = 148°. Eval Well Lock. ALP = 1720 psi, online. Heater in well house and working properly. SV = C. WV, SSV, MV = O. IA, OA = OTG. 22:00 3/5/2025 T/I/O = 280/1710/20. Temp = 148°. Eval Well Lock. ALP = 1710 psi, online. right side riser OAP 20 psi, left side riser OAP 10 psi. Heater in well house and working properly. SV = C. WV, SSV, MV = O. IA, OA = OTG. 04:00 November 25, 2025 Cut off fluted centralizer Cut and removed 13 3/8” to 12” from ground. Dug down ~6” inside 13-3/8” casing to remove contaminated cement UT-ed wall thickness of 13-3/8” and 7” casing weld areas November 26, 2024 Wrapped to keep water out for the night. November 28, 2024 Fit and welded wedding bands. Completed QC and UT welded seams. . Fitted up top plate. Welded online welds and got inspected November 29, 2024 Wrapped tree with heating machine. November 30, 2024 Heated well. Made first pass on top and bottom of cap. December 1, 2024 Heated and completed welding. Final risers installed 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in this pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU X-10A OA Downsqueeze Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 215-004 50-029-20467-01-00 341J ADL 0028313, 0047475 13032 Conductor Surface Intermediate Liner Production Tieback Liner 8984 81 2641 8731 10601 3075 12700 20" x 30" 13-3/8" 9-5/8" 7" 3-1/2" x 3-1/4" x 2-7/8" 8985 37 - 118 36 - 2677 1702 - 10433 34 - 10635 9957 - 13032 2370 37 - 118 36 - 2677 1702 - 8756 34 - 8910 8386 - 8984 12690, 12864 2670 4760 5410 10530 12700 5380 6870 7240 10160 10720 - 12870 4-1/2" 12.6# 13cr85 33 - 100068974 - 8984 Structural 4-1/2" HES TNT Packer No SSSV Installed 9794, 8526 Date: Torin Roschinger Operations Manager Michael Hibbert michael.hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY 12/23/2024 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 8:37 am, Dec 10, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2024.12.10 06:32:23 - 09'00' Torin Roschinger (4662) 324-693 JJL 12/10/24 10-404 SFD 12/11/2024 DSR-12/16//24*&: Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2024.12.17 09:57:18 -09'00'12/17/24 RBDMS JSB 121824 OA WellLock Squeeze Well:X-10A PTD:215-004 Well Name:X-10A API Number:50-029-20467-01 Current Status:Under-Eval PAL Rig:N/A Estimated Start Date:January 1, 2025 Estimated Duration:2days Reg.Approval Req’std?Yes - 10-403 Date Approval Rec’vd: Regulatory Contact:Abbie Barker Permit to Drill Number:215004 First Call Engineer:Michael Hibbert 907-903-5990 Second Call Engineer:Aras Worthington 907-440-7692 Current Bottom Hole Pressure: Max Bottom Hole Pressure: Max. Proposed Surface Pressure: Recent SI Tubing Pressure: Min ID: 3250 psi@ 8800’ TVD 3350 psi @ 8800’ TVD 2370 psi 988 psi on 5/28/24 2.37” LTP @ 9950’ Estimated Brief Well Summary: X-10A was CTD sidetracked in March 2015 in the southern part of X-ray pad in the Ivishak water flood area. Well is gas lifted and produces ~6000 bwpd, 150 bopd, and ~40 IOR. In May 2013 a RWO was completed to cut and pull the 9-5/8” casing from 1702’. A 7” tieback was installed and the 7” x 9-5/8” and 13-3/8” was cemented to surface and the 7” has slip-lock wellhead at surface. A casing excavation repair was completed to seal the fully cemented 7” x 13-3/8” casing annulus. The well was excavated less than two feet and plate patch welded between the competent 7” and 13-3/8” casings. Two 1” weldolet were placed in the plate repair to allow for monitoring and treating if needed. The well was POP’d post surface casing repair and the OA repressurization was not manageable by bleeds. Current Status: X-10A is currently under evaluation starting 12/9/2024. Objective: Squeeze OA with Well Lock (or similar) to repair OA repressurization. Procedure: 1 Valve Shop NU OA integral valve 2 DHD Squeeze OA with Well Lock 3 DHD POP U/E and monitor OA repressurization 4 Valve Shop ND integral valve 5 DHD Re-squeeze OA with Well Lock if necessary Attachments: x Current Wellbore Schematic x Sundry Change Form OA WellLock Squeeze Well:X-10A PTD:215-004 Hilcorp North Slope, LLCHilcorp North Slope, LLCChanges to Approved Work Over Sundry ProcedureDate: December 9, 2024Subject: Changes to Approved Sundry Procedure for Well X-10ASundry #:Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to theAOGCC by the workover (WO) “first call” engineer. AOGCC written approval of the change is required before implementing the change.StepPageDate Procedure ChangeHNSPreparedBy (Initials)HNSApprovedBy (Initials)AOGCC WrittenApproval Received(Person and Date)Approval:Asset Team Operations Manager DatePrepared:First Call Operations Engineer Date 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in this pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU X-10A Surface Casing Weld Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 215-004 50-029-20467-01-00 341J ADL 0028313, 0047475 13032 Conductor Surface Intermediate Liner Production Tieback Liner 8984 81 2641 8731 10601 3075 12700 20" x 30" 13-3/8" 9-5/8" 7" 3-1/2" x 3-1/4" x 2-7/8" 8985 37 - 118 36 - 2677 1702 - 10433 34 - 10635 9957 - 13032 2370 37 - 118 36 - 2677 1702 - 8756 34 - 8910 8386 - 8984 12690, 12864 2670 4760 5410 10530 12700 5380 6870 7240 10160 10720 - 12870 4-1/2" 12.6# 13cr85 33 - 100068974 - 8984 Structural 4-1/2" HES TNT Packer No SSSV Installed 9794, 8526 Date: Aras Worthington for Torin Roschinger Operations Manager Michael Hibbert michael.hibbert@hilcorp.com 907-903-5990 PRUDHOE BAY 9/19/2024 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 2:13 pm, Sep 05, 2024 Digitally signed by Aras Worthington (4643) DN: cn=Aras Worthington (4643) Date: 2024.09.05 10:28:49 - 08'00' Aras Worthington (4643) 324-504 Functioning pressure gage on OA top operate well. A.Dewhurst 11SEP24 10-404 MGR10SEP24 DSR-9/5/24*&: Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2024.09.13 21:04:56 -04'00'09/13/24 RBDMS JSB 091624 Excavation Weld Repair Well:X-10A PTD:215-004 Well Name:X-10A API Number:50-029-20467-01 Current Status:Not Operable PAL Rig:N/A Estimated Start Date:September 19, 2024 Estimated Duration:28 days Reg.Approval Req’std?Yes - 10-403 Date Approval Rec’vd: Regulatory Contact:Abbie Barker Permit to Drill Number:215004 First Call Engineer:Michael Hibbert 907-903-5990 Second Call Engineer:Jess Worthington (907) 564-4626 (O)907-602-8715 (M) Current Bottom Hole Pressure: Max Expected Surface Pressure: Recent SI Tubing Pressure: Min ID: 3250 psi@ 8800’ TVD 2370 psi 988 psi on 5/28/24 2.37” LTP @ 9950’ Estimated Brief Well Summary: X-10A was CTD sidetracked in March 2015 in the southern part of X-ray pad in the Ivishak water flood area. Well is gas lifted and produces ~6000 bwpd, 150 bopd, and ~40 IOR. In May 2013 a RWO was completed to cut and pull the 9-5/8” casing from 1702’. A 7” tieback was installed and the 7” x 9-5/8” and 13-3/8” was cemented to surface and the 7” has slip-lock wellhead at surface. A casing excavation repair is being planned to seal the fully cemented 7” x 13-3/8” casing annulus. The well will be excavated less than two feet and plate patch welded between the competent 7” and 13-3/8” casings. Objective:Excavate and weld external surface casing patch to mitigate LELs when well is on-line Notes On Wellbore Condition: x Well made Not Operable on 2/4/23 after LEL were detected 1” and 1’ above conductor – leaking from the 7” x 13-3/8” cement Procedure: Pre-Sundry Work Prep Work – Slickline and Fullbore 1. Sweep gas, Load IA and tbg, bullhead to perfs a. 475 bbl crude 2. Set TTP 9917’ MD and CMIT-TxIA to 2500 psi 3. Bleed tubing and IA pressures to 0 psi, rig up IA companion valve 4. Evacuate crude in IA below the conductor cut area (~47” below grade) 5. Rig up fittings for N2 purge across IA and companion IA valve 6. Disconnect well 7. Pull well shelter and floor kit 8. Complete ACWR Well Repair Procedure: 1. Excavate 17” which equates to 47” below grade, avoid confined space Sundry Work (Approval required to proceed) Surface Casing Repair 2. Cutconductor as close to cellar floor as possible (assumption is 6” from cellar floor), remove cement 3. Cut 13-3/8” casing 12” above conductor cut, remove cement a. See diagram below Passing CMIT- TxIA required to proceed. - mgr Excavation Weld RepairWell:X-10APTD:215-004 Excavation Weld Repair Well:X-10A PTD:215-004 4. Remove additional cement between the 13-3/8” and 7” casing, to furthest extent possible, ideally 12” (this is to avoid heat sink issues when preheating the weld areas for the 13-3/8” wedding bands) 5. Rig up N2 purge, monitoring purge return for LELs 6. Weld 13-3/8” casing band a. Fit up of band will be determined by welder input on plate fit up between bands b. L-80 to X65 API 5L 7. Fit up 7” casing band and adjust so that a ½” pl ate can be welded between the rings while ensuring there is at least 12” between the lower casing spool and 7” band (to allow sufficient room for pre- heating, 12” is needed) a. L-80 to X65 API 5L 8. Stencil template for ½” plate and fab plate with CNC 9. Weld 2, ½” thredolets onto top of plate for future pressure gauge and plug 10. Fit up plate and weld a. X65 API 5L to A572 11. NDE Welds a. UT wedding bands b. MT Plate 12. Install Well shelter and floor 13. Reconnect Well Post Welding – DHD 1. Low pressure test with nitrogen to 150 psi. Use 4-way meter to confirm competent OA at surface. 2. OA integrity test with diesel to 1200 psi. Slickline 1. Pull TTP 2. Turn well over to Operations to bring online under evaluation. Consider placing a nitrogen cap on OA before POP’ing or POP’ing with an open bleed to mitigate the liquid packed annulus concern. Operations 1. Set MOASP to 1000 psi and install wireless gauges for monitoring 2. Check pressures regularly as the well comes online and bleed accordingly to determine behavior of newly re-established OA. 3. Well Integrity coordinator to track OA behavior and make ‘Operable’ if the well stays online within acceptable criteria. If well does not behave within acceptable criteria, then a well-lock squeeze will be planned and pumped at a future time. Excavation Weld Repair Well:X-10A PTD:215-004 Hilcorp North Slope, LLCHilcorp North Slope, LLCChanges to Approved Work Over Sundry ProcedureDate: September 5, 2024Subject: Changes to Approved Sundry Procedure for Well X-10ASundry #:Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to theAOGCC by the workover (WO) “first call” engineer. AOGCC written approval of the change is required before implementing the change.StepPageDate Procedure ChangeHNSPreparedBy (Initials)HNSApprovedBy (Initials)AOGCC WrittenApproval Received(Person and Date)Approval:Asset Team Operations Manager DatePrepared:First Call Operations Engineer Date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y Samantha Carlisle at 1:00 pm, May 11, 2022  'LJLWDOO\VLJQHGE\6WDQ*ROLV  '1FQ 6WDQ*ROLV   RX 8VHUV 'DWH  6WDQ*ROLV  '650*50$<'/% ; 3DVVLQJ&0,77[,$WRSVLSULRUWR323 PLQXWHFKDUWHG   JLC 5/17/2022 Jeremy Price Digitally signed by Jeremy Price Date: 2022.05.18 10:52:54 -08'00' RBDMS SJC 052322 ĞŵĞŶƚͬ^ĞĂůĂŶƚ dŽƉ:Žď tĞůů͗ yͲϭϬ Wd͗ ϮϭϱͲϬϬϰ W/͗ϱϬͲϬϮϵͲϮϬϰϲϳͲϬϭ tĞůůEĂŵĞ͗yͲϭϬWĞƌŵŝƚƚŽƌŝůůEƵŵďĞƌ͗ϮϭϱϬϬϰ tĞůůdLJƉĞ W>W/EƵŵďĞƌ͗ϱϬͲϬϮϵͲϮϬϰϲϳͲϬϭ :Žď^ĐŽƉĞ͗dŽƉũŽď ZĞŐ͘ƉƉƌŽǀĂůZĞƋ͛Ě͍zĞƐ ƵƌƌĞŶƚ^ƚĂƚƵƐ͗hŶĚĞƌǀĂů͕ KŶůŝŶĞ ĂƚĞZĞŐ͘ƉƉƌŽǀĂůZĞĐ͛ǀĚ͍͗ ƐƚŝŵĂƚĞĚ^ƚĂƌƚĂƚĞ͗ϱͬϭϴͬϮϬϮϮ ƐƚŝŵĂƚĞĚƵƌĂƚŝŽŶ͗ϯĚĂLJ ZĞŐƵůĂƚŽƌLJŽŶƚĂĐƚ͗ďďŝĞĂƌŬĞƌ &ŝƌƐƚĂůůŶŐŝŶĞĞƌ͗KůŝǀĞƌ^ƚĞƌŶŝĐŬŝ ^ĞĐŽŶĚĂůůŶŐŝŶĞĞƌ͗ůĂŝƌĞDĂLJĨŝĞůĚ ƌŝĞĨtĞůů ^ƵŵŵĂƌLJ͗ yͲϭϬ ŝƐĂŐĂƐůŝĨƚĞĚƉƌŽĚƵĐĞƌ ǁŝƚŚ ĂƐůŝƉůŽĐŬǁĞůůŚĞĂĚƐĞƚŽŶƚŚĞϳ͟ ƉƌŽĚƵĐƚŝŽŶĐĂƐŝŶŐĂƐƉĂƌƚŽĨƚŚĞ ϮϬϭϯZtK ƚŽ ŝŶƐƚĂůů Ă ĐĞŵĞŶƚĞĚ ƐĐĂďůŝŶĞƌ ŽǀĞƌĂ ůĞĂŬŝŶƚŚĞϵͲϱͬϴ͟ ĐĂƐŝŶŐĂƚϰϰϯϵ͛ D͘ KƉƚŝĐĂůŐĂƐ ŝŵĂŐŝŶŐ ƐĐĂŶƐ ŽĨƚŚĞĞdžƉŽƐĞĚ ƐƵƌĨĂĐĞ ĐĞŵĞŶƚƚŽƉŽƵƚƐŝĚĞŽĨƚŚĞϳ͟ ƉƌŽĚƵĐƚŝŽŶĐĂƐŝŶŐ ŚĂǀĞƐŚŽǁŶ Ă ƐŵĂůůĂŵŽƵŶƚŽĨĨƵŐŝƚŝǀĞŐĂƐ ĞŵŝƐƐŝŽŶƐ ǁŚĞŶƚŚĞǁĞůůŝƐŽŶůŝŶĞǁŝƚŚŐĂƐůŝĨƚĂƉƉůŝĞĚƚŽƚŚĞϰͲϭͬϮ͟ džϳ͟ ĂŶŶƵůƵƐ͘ dŚĞϳ͟džϭϯͲϯͬϴ͟ ĐĞŵĞŶƚƚŽƉŝƐΕϭϴ͟ ďĞůŽǁƚŚĞ ƚŽƉŽĨƚŚĞ ĐƵƚ ϭϯͲϯͬϴ͟ ĂƚƐƵƌĨĂĐĞ͘ ƵƌƌĞŶƚ ^ƚĂƚƵƐ͗ yͲϭϬ ŝƐĐƵƌƌĞŶƚůLJƵŶĚĞƌĞǀĂůƵĂƚŝŽŶƐƚĂƌƚŝŶŐ ϬϱͬϭϭͬϮϬϮϮ͘ ^ĐŽƉĞŽĨtŽƌŬ͗ ƵŵƉĐĞŵĞŶƚ ĂŶĚͬŽƌƐĞĂůĂŶƚŵĂƚĞƌŝĂůŝŶƚŽ ƚŚĞ ϳ͟džϭϯͲϯͬϴ͟ ǀŽŝĚƚŽƐĞĂůŽĨĨƚŚĞĨƵŐŝƚŝǀĞŐĂƐ ĞŵŝƐƐŝŽŶƐ͘ WƌŽĐĞĚƵƌĞ͗ ϭ ^>ͬ&^ĞƚƉůƵŐ͕D/dͲddž/ƚŽϮϱϬϬŵĂdž ĂƉƉůŝĞĚƉƌĞƐƐƵƌĞ͘ ϭ ,ůĞĂŶ ϳ͟džϭϯͲϯͬϴ͟ ǀŽŝĚ ĞŐŝŶ^ƵŶĚƌLJtŽƌŬ ϭ ,ƵŵƉĐĞŵĞŶƚĂŶĚͬŽƌƐĞĂůĂŶƚŵĂƚĞƌŝĂůŝŶƚŽ ϳ͟džϭϯͲϯͬϴ͟ ǀŽŝĚ͘ Ϯ ,WKWƚŽĞǀĂůƵĂƚĞŝĨĨƵŐŝƚŝǀĞĞŵŝƐƐŝŽŶƐĐŽŶƚŝŶƵĞĂĨƚĞƌŝŶŝƚŝĂůƚƌĞĂƚŵĞŶƚ͘ ϯ ,ZĞƚƌĞĂƚ ǁŝƚŚĐĞŵĞŶƚŽƌƐĞĂůĂŶƚŝĨŶĞĐĞƐƐĂƌLJ  '/% ƵŵƉĐĞŵĞŶƚ ĂŶĚͬŽƌƐĞĂůĂŶƚŵĂƚĞƌŝĂůŝŶƚŽ ƚŚĞ ϳ͟džϭϯͲϯͬϴ͟ ǀŽŝĚƚŽƐĞĂůŽĨĨƚŚĞĨƵŐŝƚŝǀĞŐĂƐ ĞŵŝƐƐŝŽŶƐ͘ ĞŵĞŶƚͬ^ĞĂůĂŶƚ dŽƉ:Žď tĞůů͗ yͲϭϬ Wd͗ ϮϭϱͲϬϬϰ W/͗ϱϬͲϬϮϵͲϮϬϰϲϳͲϬϭ +LOFRUS 1RUWK6ORSH//&+LOFRUS 1RUWK6ORSH//&Changes to Approved Work Over Sundry Procedure'DWH 0D\ 6XEMHFW &KDQJHVWR$SSURYHG 6XQGU\3URFHGXUHIRU :HOO ;$6XQGU\ $Q\PRGLILFDWLRQVWR DQ DSSURYHGVXQGU\ ZLOOEHGRFXPHQWHGDQGDSSURYHGEHORZ &KDQJHVWRDQDSSURYHG VXQGU\ ZLOOEHFRPPXQLFDWHGWRWKH$2*&& E\WKH ZRUNRYHU :2 ³ILUVWFDOO´HQJLQHHU $2*&&ZULWWHQDSSURYDORIWKHFKDQJHLVUHTXLUHGEHIRUHLPSOHPHQWLQJWKHFKDQJH6WHS3DJH'DWH 3URFHGXUH&KDQJH+163UHSDUHG%\ ,QLWLDOV +16$SSURYHG%\ ,QLWLDOV $2*&&:ULWWHQ$SSURYDO5HFHLYHG 3HUVRQDQG'DWH $SSURYDO$VVHW7HDP2SHUDWLRQV0DQDJHU 'DWH3UHSDUHG)LUVW&DOO 2SHUDWLRQV (QJLQHHU 'DWH STATE OF ALASKA LASKA OIL AND GAS CONSERVATION COMMA" REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing ❑ Operations shutdown 0 Suspend 0 Perforate Q Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill ❑ Perforate New Pool 0 Repair Well ❑ Re-enter Susp Well 0 Other: 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 215-004 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20467-01-00 7. Property Designation(Lease Number): ADL 0047475 8. Well Name and Number: PBU X-10A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL ■/�_ 11.Present Well Condition Summary: RECEIVED Total Depth: measured 13032 feet Plugs measured 12700 feet MAR 2 2 2016 true vertical 8984 feet Junk measured 12690/12864 feet Effective Depth: measured 12700 feet Packer measured 9794 feet ®(G�� true vertical 8985 feet Packer true vertical 8255.74 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"x 30" 37-118 37-118 Surface 2643 13-3/8"72#L-80 36-2679 36-2679 4930 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 10720-10750 feet 11507-11537 feet 11700-11725 feet 12120-12220 feet 12425-12675 feet 12750-12775 feet 12830-12870 feet True vertical depth: 8974-8994 feet feet 8993-8993 feet 8994-8994 feet 8989-8994 feet 8993-8985 feet 8983-8983 feet 8983-8984 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr85 36-10006 36-8425 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): %WED APR 2 12016 Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 79 732 1828 1602 240 Subsequent to operation: 323 1071 2468 1611 251 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations Q Exploratory ❑ Development Q Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR 0 WINJ 0 WAG 0 GINJ ❑ SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature A ! r Phone +1 907 564 4424 Date 3/22/16 Form 10-404 Revised 5/2015 VL 4/ vl• RBDMS -'- MAR Z 3 2016 Submit Original Only Y/,y/.6 a) a 0 0 0 0 0 0 0 t0 r CO M N y- V _ Ln p N (S\:1)- O U N 0 0 0 0 s c) 0 i M r- 6 N N M CA N 00 c- CO O Do V' r— 6 CO 0 O OP CD O CA CO Ln 00 00 LO V Ln N- Ln LO O CA O CO N CO 00 t` O CD CA cr N CO 00 CO CO CO CO CO O 1 1 1 1 1 1 1 1 1 H Ln CO CO LO CO N- O LO CO O) C1) CO CO CO CO M co N- O) co CO 00 00 00 wOOMNO NCO ao N M M O O CO O 0 0 V CO M O O N 0 0 0 0 c- M O t rai Q Q O craCD _oCD r CO• M CO O O) M M CY) L r O O OP v— cX /�/� W LC) a00 CD 0 0 0 CO 00 a0 00 CO U JCOD J J J d 7._ M N _1 *k J () O LO Cl) N X *k *k O CO CO O O Exp N CO N N CO UN L? r- c\- r- 00 O M M N v— t ✓ 01 01 Cn c) CO _� M O C o0 CQO o0 oo r- M N- O CD a) N O) co r- L1) ao O J LU r:7)O Q Q N U U 0 0 U a c a Z Z wwwwwm 0Dzzzz � (n Z Z J J J J H • • Packers and SSV's Attachment PBU X-10A SW Name Type MD TVD Depscription X-10A TBG PACKER 9793.96 8255.74 4-1/2" HES TNT Perm Packer X-10A PACKER 9949.05 8379.43 45 KB Liner Top Packer • S • _ c C e \ / k t e § = EG \% \ ® x0 \ c) \ * 3 2 k ik ,- q / mow a2 ® c c D o ƒ c C / m o cfi2 & _ ry » o * \ O o %± co E E W t / \ / / / / / a_ 2 0 I - f I n ¥ O < / 5/ 2220 ƒ \ � � _J � / / a- / U- k a + m CO e E o & 0 'UJ a o 0_ - � I- a E 6 o • . 0- 0 o \® / Co O o g o 2$ h- r _o / \ / p7 / / mea / / O - a p0 D- / o a 'Cr) o & \ 2 G .@.g : / / 7 I : 7 N 0 e a % _ 1 E \ I \ W\ ( a c $ / •5 @ \ 7 /f / E / \ / 4-6 � �e � � �\ � � / ® 2 # 7 / c o o o / / — / / 0 / / \ 2 / y O 2 : O O a k et e w- L < e (0 » / / 7 c o 5 \ CV 3 % / / m A < Its=" 4-1/16"CMV • X_ I p A SO :30 6"@ 12854".4 NOTES: 0*@ 1 CHROME TBG IVAILHEAD=CMV 7"SLPLOCK A ACTUATOR= BAKER C —� r'7 OKB.E.EV= 74.94' i,'r 4. , BF.E-EV= 40.79' KOP= 3100' —"CONDUCTOR --i + 2120' }--4-1/2"HES X NP,D=3.813" Max Angle= 106°@ 11062' —a,—' ;;. Datum MD= 10591' D= k .'' ::: Datum TVD= 8800'SS ;. r 2589 }—r9 5/8'Dv RCR l 9-5/8"CSG STUB(04130113) —{ 1702' _ t� GAS UFT MANDRELS 13-3/8"CSG,72#,L-80,D=12.347" — 2677' HA cio * ST MD TVD DEV TY FE VLV LATCH PORT DATE ri * 5 3227 3221 15 KBG2 DOME BK 16 04/23/15 r 4 5458 5010 42 KBG2 SO BK 20 04/23/15 Minimum ID =2.37" @9950* r{ 3 7219 6249 46 KBG2 *CMY BK 0 01/30/15 3-1/2" BKR KB LTP y 2 8581 7254 38 KBG2 DMY BK 0 01/30/15 i 4 0,1 1 9610 8107 34 KBG2 DMY BK 0 01/30/15 t.t:# 4 *STA#3=DMY HAS BtTE'1®PACKING 4 9770' }—4-1/2"HES X NP,D=3.813" 4 r. r� 9794' I—7"X 4-1/2"HES TNT PKR,D=3.856" VII * 7"SCAB LNR,26#,L-80 VAM TOP HC, H 9918' y 9917' j--4-1/2"HES X NP,D=3.813" .0383 bpf,D=6.276" �? TOP OF 7"LNR —I 9918' v 9950' H 45 KB BKR LIP,D=2.37"(03/08/15) TOP OF 3-112"LNIR H 9957' " �, 9957' --I 3.70"BKR DEPLOY SLV,D=3.00" .. 9978' H3-1/2"OTIS X NPD, =2.812" 4-1/2"TBG, 12.6#,13CR-85 VAM TOP, —1 10006' I .0152 bpf,ID=3.958" 9993' 1--4-1/2"HES XN NIP, ESTMA It3.)TOP OF 3-1/2"CMT — —10024' MLLED TO 3.80"(02101/15) BEHIND 9-5/8"CSG,47#,L-80 BTRS,D=8.681" —{ 10433' � , 10006' I—4-1/2"WLEG,D=4.00" CT LNR xx:• 3-1/2"LNR,9.3#,L-80 STL, 10489' 10024'-10029' —13-1/2"TBG PINCH(09/07/15) .0087 bpf,D=2.992 4 10489' —{3-1/2 X 3-3/16"XO,D=2.786" 7"X 4-1/2"DELTA WI-RESTOCK-2ND(02/24/15) —{ 10632' X (W/RA TAG @ 10641') 7"LNR,29#,L-80 BTRS,.0371 bpf,D=6.184" —10632 4 41 MLLOUT WNDOW(X-10A) 10635''-10644' 3.625"BKR GEN II WHIPSTOCK w/2 RA TAGS —{ 10688'? 10'FROM THE TOP(02/01/15) -;=? 11361' —I3-3/16 X 2-7/8"XO,ID=2.377" 1 PERFORATION SUMMARY „,,,,,, 014 RE'LOG:SLB ON 03/07/15 +.. ; 12700' ELM —2-718”BKR ANGLE AT TOP PERE:46° 10720' k*.*,***,*.#'*'' .w @ , 'K,.•• ® . CBP(7/18/15) Note:Refer to Production DB for historical perf data r}�: {x�ti 12989' H PBTD SIZE SPF MBRVAL Opn/Sgz SHOT SQZ +' 2" 6 10720-10750 O 09/20/15 3-1/4"LNR 6.6#L-80 TC11, —L 11361' . 2" 6 11508-11538 O 02/21/16 +. 2" 6 11701-11726 0 02/21/16 .0079 bpf,D=2.85" '4iNtftititik� 2" 6 12120- 12220 0 03/09/15 FISH REMNANTS OF CBP(09/12/15) 12690'CTM 2" 6 12425-12675 0 03/09/15 2" 6 12750- 12775 C 03/09/15 FISH MLLED&PUSHED CDP(07/16/15) H 12864'CTM 2" 6 12830- 12870 C 03/09/15 4 2-7/8"LNR,6.5#,L-80 STL, 0058 bpf,ID=2.44" —I 13032' DATE REV BY COMMINTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 07/28/80 INITIAL COMPLETION 10/12/15 ALMIJMDITBG PUNCH(9/7)&RSH(9/12) WELL: X-10A 12/15/90 MES RWO 10/12/15 JA/JMD EST TOP OF 3-1/2"CMT(09112/15) FERMTNo:"L150040 05/09/13 D-14 RWO 10/12/15 DHS/JMD ADPERFS(09/20/15) AR No: 50-029-20467-01 03/10/15 NORDIC 1 CTD SIDETRACK(X-10A) 02/22/16 JLS/JMD ADPERFS(02/21/16) SEC 7,T1ON,R14E 476'FNL&479'FEL 05/04/15 TJHJMD GLV C/O(04/23/15) 08/12/15 JLS/JMD SET CIBP/FISH(07/16-18/15) BP Exploration(Alaska) STATE OF ALASKA 41PLASKA OIL AND GAS CONSERVATION COMM! ' REPORT OF SUNDRY WELL OPERATIO 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate ® Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 215-004 3. Address: P.O.Box 196612 Anchorage, Development p Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20467-01-00 7. Property Designation(Lease Number): ADL 0047475 8. Well Name and Number: PBU X-10A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 13032 feet Plugs measured 12700 feet true vertical 8984 feet Junk measured 12864 feet OCT 13 2015 Effective Depth: measured 12700 feet Packer measured 9794 feet iJ true vertical 8985 feet Packer true vertical 8255.74 feet pfltO3 CC Casing: Length: Size: MD: TVD: Burst: ' Collapse: \,/ Structural Conductor 80 20"x 30" 37-118 37-118 Surface 2643 13-3/8"72#L-80 36-2679 36-2679 4930 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 10720-10750 feet 12120-12220 feet 12425-12675 feet 12750-12775 feet 12830-12870 feet True vertical depth: 8974-8994 feet 8989-8994 feet 8993-8985 feet 8983-8983 feet 8983-8984 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr8 36-10006 36-8425 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): at Treatment descriptions including volumes used and final pressure: atitt" 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 49 367 1888 906 219 Subsequent to operation: Shut-In 20 14.Attachments:(required per 20 AAC 25.070.25.071,a 25.283) 15.Well Class after work: Daily Report of Well Operations Ed Exploratory 0 Development m Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Il Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature ,14r4.✓l. Phone +1 907 564 4424 Date 10/13/15 _ _ o Form 10-404 Revised 5/2015 0 /0//f/K � RBDMS (1 t. 2015 Submit Original Only • • a) a O O o O c9o g o co O N L N O O ,c\...1 C) co"" C N Ln �t I - N U y 0 0 0 0 0 0 0 0 i CO •cr N- O N N O N CO CO 0 m V (fl co O) CO OD O Co O CO LO co Co to v tf) I- LO LO O O O CO N CO CO N- O N- O O N CO CO CO CO CO CO CO H LO N- C CO LC) CO IC) OO O O CO M CO M I-- CO CO I- O CO N- CO 00 CC) CO (1) CD O CO N O N CO CO N CO CO O CO CO O O O ti CO d- CO O O 0 0 0 0 N M O v o 1 1 1 1 I I I 1 � a o � a I"- CO IS O CO to O O CO co co CO 1"-- O O b M CO O O Ca CD LO a CO O 0 0 0 p0 CO CO CO C) CS) ' 00 2 J J J •y U) - - (0 O O (0 (5 CV O CO N - N - - U _ _ CV v bo _ N r ti O M M N CO CO CO r C CO (0 CO N- C) N O CO to CO J W W Q CP 0 • UUWN W U 0 u_ cc cc cc cc c Z Z W W W W W W cp Q D z z Z_ _Z Z_ Z_ D 0 Cn Z Z J J J J H • w Packers and SSV's Attachment PBU X-10A SW Name Type MD TVD Depscription X-10A TBG PACKER 9793.96 8255.74 4-1/2" HES TNT Perm Packer X-10A PACKER 9949.05 8379.43 45 KB Liner Top Packer 0 • ± / / / = o & e _ ± / r c a) .E. b 2 / / - / _ / 0 \ \ § % . 2 $ ) 2 ® � \ uJ c ee $ w o = E e cl 4_, / E � C . 00• _J -0 e22a = 2 $ 7/ / / k \ / � � m $ _ .- E = o0 0 - - r - § d = ecCE•G6 / / \ ....71 ..„C a) Cl, < » g @ = g n ? ("73U ¢ y - -0 0 \ ƒ 0 F- 0 / c ?6 ° ° ° < p 2 a + C , _ E c / / \ n < o O I co 2 / / / f k & / a \ O © 0 E ■ < = c U 2 = f o % G 0 < E \ © 7 2 / -I 2 \ \ k 2 � / 6 H 0 2 0 R a a_ m e cp R E E 0 = O < m / E � / IG = \\ / \ 2 $ aid R $ gcp 0- S _D '- / ) % 09E = f I \ / k E E © ° Q- 19 Rk o ) E / / k � �/ � - o"x Lii / ± / 0 O k \ U k E 0@ b - \ 0 b \ a $ ko / \ -- / / (N_ $ / EES ƒ \ 0. / / k \ IS \ / E § Et \ � H r0 = 2 S f o 5 2 ± f z ® 0 1 \ ƒ a) ° ® 2 '- v- - e q ƒ E m f ƒ / o w 2 \ '- \ = 2 E E _ - / 0- m . O 0 R -J Ci � '5 2 0, 2 2 / � R o TD- *a3 - 2 w \ ± / 0 - ® 3 t R ° 0, / 2 ® / -- c) / / f -- co 2 I7 / � § \ � / � � ~ � � I + �� IRp26 � 22 COW e ± a x »\ a $ q S/ / \ / < / " I J 0 / 3 \ \ /\ * c 1`-• 4 O = E m ~ I m _ / 0 » \ E. = o ° ° 2 ® ' k o m o ° _ R R I U o c = 2 e 7) 2 e dE \ -0 CI g C) -I — W m ® 2 .2 0 to c I k n # E $ R & 2 ± < % O 2 _ © 0 5 / k/ / 7 / / 2 / \ / 0 \ / / z I / w - / / / / y \ .$ 0 m t 0 5 t U 2 * _ $ m 2 t t � E R 0 $ 3 : r- r- r- r c 2 < r r r o / d / / / ? r 5 a R \ I '- & A « / \ \ / a < MEE.= 4-1/16"CNV • X-1 OAK)TES:WELL ANGLE>70*@ 10850". WELLHEAD=cm 7"SIFLOCK MAX DOGLEG:30.6*@ 12854".4-112"CI-ROME TI3G 0ACTUATR BAKER C OKB. LE = 74.94 1 Of LV= 40.79" .401"1.1«04,e r4'14i°„:i"k'ggi'4 I 2120' 4-1/2"I ES X NE,0=3.813KOP= 3100 :cctDucT°R, — ? * Mix Angle= 106'./(11062' GAS LET MA. VIVI tumMD 10591' D tle. Cattim IVO= 8800'SS ov e, to, 4 _ 2589' 1—9-5/8"EN FKR 4 :01 ,„, 9-5/8"CSG STUB(04/30/13) H 1702' 4 Lri _ 4,i 4 NCFELS 13-3/8"CSG,72#,L-80,ID=11347" 2677' to ST MD TVD DEV TYPE VLV LATCH FORT DATE b4 5 3227 3221 15 KBG2 COME BK 16 '04123115 IllgVI 4 5458 5010 42 KBG2 SO BK 20 04/23/15 Minimum ID = 237" @ 9950' ie. z 3 7219 6249 46 KBG2 'OWBK 0 01/30/15 4 :01 3-1/2" BKR KB LIPv V vo 2 8581 7254 38 KBG2 OWBK 0 01/30/15 ,_. 0,1 1 9610 8107 34 KBG2 DAY BK 0 01/30/15 40 4 tto' 10 *STA 113=MAY I-UtS EXT: a PACKING .1 4 ;ii- 9770' —14-1/2"HES X MP,0=3.813" I te' to' 0. r or ,o. 6 9794' ,—7"X 4-1/2"FES TNT PKR,ID=3.856' 0.1 0 iri 4, IP 7"SCAB LI42,264,L-80 VAM TOP HC, 9918' !V 0.* E! 9917' —14-1iT i VIM X NP,13=3813* F.0383 bpf,ID=6.276" 4, 4 44 1.4 TOP OF 7*LNR —I 9918' —,; 8850' —45 KB BKR LTP,ID=2.37'(03/08/15) 9ssr —3.70"BKR DEFLOY SLV,ID=3.00"TOP OF 3-1/2"LNIR 1— 9957' 9978" -1 3-1/2"OTE X NP,ID=2.812' 4-1/2"TBG,12.64,13CR-85 VAM TOP, H 10006' 9993* —4-1/2"FES XN NE', .0152 bpf,0=3.958' IJ 1 11 I IIII NILLED TO 3.80'(02/01/15) ESTIMA ill)TOP OF 3-1/2"CMT "10024' BEHIND `..' ''' 111Vg 10008* —14-1/2"WLEG,0=4.00" 1 CT ENR P pl, 9-518"CSG,474,L-80 BTRS,ID=8.681" H 10433' 1-41 4 . 10024.-10029' 3-1/2"TBG PUNCH(09/07/15) 3-1/2"LM,9.3#,L-80 STL, —I 10489` 4 io,,,46, 10489' —3-1/2 X 3-3/16'XO,0=2.786* :40' , , .0087 bpf,I)=2.992 TX 4-1/2"DELTA 1AHESTOCK-2M3(02/24/15) — 10632' itv. 4 .4. (Wl RA TAG @ 10641') Ilk. MLLOUT WINDOW(X-10A) 10635"-10644' 7"LNR„294,L-80 B iHS, 0371 bpf,13=6.184" — "10632 ' 11361' —,3-3/16 X 2-7/8'XO,ID=2.377" -k?..k4410., Skil, 3E25"BKR GEN 11 W-iPSTOCK w/2 RA TAGS — 10688'? 0:,:V,,,,,4140 12690'CTM —FISH:RENWANTS OF 10'FROM'WE TOP(02/01/15) .y,,,ai,.--,/;- -cs• 404 CX3P(09/12/15) ejAk:_AAAr.t 4, 11., „ Itik„, 12700'ELM —2-7/8"BKR PBWORATEN SUMAARY 0* toilbAN•71:111;11k,' VICIOlo lik.' 4":10. *1r* *.: LOG.SLB ON 03/07/15 eiew 11/ 11 441t1k „,, it* CEP(7/18/15) or, 0%,..40 ANGLE AT TOP FT3W-46'0 10720' s-1e.S.oluouIt, 4t. , Alp, " kite:Refer to Production DB for hstori12989 —1. PBTD cal perf data 4 ""le. 044 40, SE SPF INTERVAL Opn/Sqz SHOT SQZ , 3-1/4"LW,6.6#L-80 TC11, Nip,.111, Abh... 2" 6 10720-10750 0 09/20/15 2" 6 12120-12220 0 03/09/15 .0079 bpf,0=2.85" 2" 6 12425-12675 0 03/09/15 11,• %.* 2" 6 12750-12775 C 03/09/15 FISH!MULLED&REFED CIBP(07/16/15) ,---I 12864"CTM 2" 6 12830-12870 C 03/09/15 2-7/8"LNR,6.5#,L-80 STL,.0058 bpf,0=2.44" — 13032' DATE REV BY COMMENTS DA I E REV BY COMMENTS FRUCHOE BAY UNT 07/28,80 INITIAL COMPLETION 10/12/15 ALMUM0113G PINCH(9/7)&FISH(9/12) WELL: X-10A 12115190 N1 RWO 10/12/15 JALM) EST TOP OF 31/2"GMT(09112/15) FITMx 2150040 05/09113 014 RWO ' 10/12/15 HNAS(09/20/15) APNM: 50-029-20467-01-01 03110/15* iDC 1 CT°SIDETRACK(X-10A) , SC 7,T1ON,R14E476'FM &479' FEL 05/04/15 TIVRADGLV C/O(04/23115) 08112/15 JLS1ESETCEPFISH(07/16-18/15) - Elplorion(Alaska) ! 4110oir-- c a, U Cj Ili C76Z Y N > cy v O o <0Y cc 0 � v L C a �:`� 0 - 0I- Z cc 1- >. `� O K CO CO M. u L4 a E o ro Q c O 8 C ,a La o C co °4-, n3 > n Q Q 3t +.. C CO v, o f "�to � "' TTr � (o o E m w Q 0 ms s., u *' Y N O. a a) a a) o .� 2 OJ H• w o V1 Q �% p Es }o w 2 Z F N t0 r o) �y w -0 > 0 r M c a Q a) Z F 0 Ou -O s- O ? F— o O 0 -I 0 0 O N co O u _c s WW a L y W W W W aOtuii I— LL LL LL LL LL LL O o o O •vi a) a -a v, aJ J J J J J Q _c O c cu a a a a a a O o z z z z z z - c a ^ u 0 LL LL LL LL LL LL Cl t a) U a) CC - O a) GJ O 0 y a; a o o N 0 ID) E U H O c o. 0 c a, LLD "" z O a > > c 4 tai '... ,�, a m '0 tri v Q v _C Ou > 0.. NO 1 Q 0 m m 0 LJ� b4) 0 U U J Jal Cl H O cc U . UJ 0 to U � ? Rs .cn - a, W `P () > o Al co it a a 1ed 0 "v z .54 rc 'Is ,,, o >- r r 1 al as u j O: a: x 04 _co 5a O O -� O —1 _1 0 w V W W W .44,.....ir,0Th....."prf v) on 2 2 2 w a a a a a) 2 m m m d CO d E E .0 z 0 0 0 = 0 III = E -a c 0 0 0 (n 0 N a) _ w 2 O: �' - J 1ce J O u 4 ' O. Cl. O_ O. �.- O C CC OD Cy. y^4%r.' w r N- M N (0 :.: cc 0 co co O) C) 0 0 U ,q CO '4_ si 0 0 0 0 0 0 � � 0 0 0 0 0 •0 'CO k— v 2 U N = oo U y U > > >< 03 > u. 0 e O w U U U U 0 0 QJ .. (n = x co rO o 0 O Cau um! 0 0 0 0 0 0 vt r CO N CO N 0 N - N- O M 1- CNS) � U :_. nry 2 N N N N N N L Q O) O) O O an T Cp N N N N N Ni-Q1 0 0 0 0 0 0 N O O O O O O a) N CO N N 1.7 to 7 a) CID C' A Q O E °; > 1 a a;t1,0 m z N O N N N N Y E N N NN J r. a•- Z i Z' N n3 i N w - X J J EZ aJ co a. L L C Y (13 0 C/a (n d �: A it a a Q � � • • CD C m N c O r a) o b.oV Y U > e. 01 - N w L `v l n L L 1-5 C OA I-E- T fa �O N i Y o � > c o O. C O O '- "a w Q Zr OC "O N fl. m -a , u7 u7 N In In N r' Oa) Q F. W UJW 0 C = j • •7 j j V) L C C ro FF� O N p2 W ? Q -O - O_ N t!) Q W I- N N Tr co w C N T > ,,) z -arm Q, c ns a) a — Q0_v I`Y O N a) Ou Ce F Q�S a) •> L -O '@ ~ wi O p O p 0 0 0 m 0_U C L 6 y0_, W W W W W W W 00 c CO . O F- LL U. LL LL LL LL LL of N E 'O . .-ti Q J J J J J J J • in o 0_ O C aJ C Cr F- Q Q Q Q Q Q Q 0_ Y co c = C a z z z z z z z - "a `^ u C LL LL LL LL LL LL LL . -C 0 d TO y j 4-. OV a) w i C C O O ) . O w a Q = Ti a) °) ti-- .-. H C 'a) 0 z = c mO a) s u > (/)_ o LL pmwO 7.. .g 0 m gcc O ! mUUUW0_ eV fF-LU � $2 =cc „,co U w w MMfa 01 UJ Ce ` O \ kJ ' N' w2 . > > > � c+ 0 0 0 J O J J 8 Z a M W U W W W W I w E 2 2 2 �' 0 2 m 0 0 0_ m m m m m to a Z 0 0 LU W 0 0 0 0 0 E p 2 2 2 2 2 2 2 s w LL .. LLI ^y ' 0_ 0. 0_ 0- 0- 0- a1 ° _ ✓ CV Ca W CO O O N M M xL; a 0 O O O 0 O M 00 td mos jr, cc 0 0 0 0 O O f6 0 0 0 0 0 0 0 O 10 0 0 0 0 0 O Co 0 W �Oth � wOO v LLL ' , y,,, U p U U p p U CC x p O N 0 0 C. C. coroV Lp O O O O O CO O o NC I N 00 M in N v 1.0 o0_ E M N N 0 01 CO 0 0 0 N N 0 7, O N N N N N N N N y- V F.-. 8 0 0 8 0 0 0 O O N N N N N N N L Q1 0 0 0 0 0 0 O •d v 0 6 6 0 0 0 O L in U) U) U) in I)) )C) 0 0_ Y) _� C O_ U C =SIal U 0_1 Z w, CU IX C C a* u a 8 2? W Z °. amo v o q c 0_Y.. E 0_'r) ~ 0_ Q N -, ,DOLL 0_ X E z v0) Y '1 C C N 03 rz v. 8 CA e1aE F. a 0_ Q °11V STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMMIJ REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations ® Fracture Stimulate ❑ Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 , Plug for Redrill 0 Perforate New Pool 0 Repair Well ❑ Re-enter Susp Well 0 Other:S C/8p 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 215-004 3. Address: P.O.Box 196612 Anchorage, Development El Exploratory ❑ AK 99519-6612 Stratigraphic 0 Service 0 6. API Number: 50-029-20467-01-00 7. Property Designation(Lease Number): ADL 0047475 8. Well Name and Number: PBU X-10A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 13032 feet Plugs measured 12700 feet 12 2 01 C true vertical 8984 feet Junk measured 12864 feet AUGuJ Effective Depth: measured 12700 feet Packer measured 9792.14,9949.05 feetAOGCC true vertical 8985 feet Packer true vertical 8254.31.8379.43 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"x 30" 34-114 34-114 0 0 Surface 2643 13-3/8"72#L-80 34-2677 34-2677 4930 2670 Intermediate 8731 9-5/8"47#L-80 1702-10433 1702-8756 6870 4760 Production 9883 7"26#L-80 33-9916 33-8353 7240 5410 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 12120-12220 feet 12425-12675 feet 12750-12775 feet 12830-12870 feet True vertical depth: 8989-8994 feet 8993-8985 feet 8983-8983 feet 8983-8984 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr8 32-10004 32-8423 Packers and SSSV(type,measured and 4-1/2"HES TNT Perm Packer 9792.14 8254.31 true vertical depth) 45 KB Liner Top Packer 9949.05 8379.43 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: caktME ty(1V 1 $ 2015 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 45 706 3220 1289 219 Subsequent to operation: 68 331 P268 877 220 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations I3 Exploratory ❑ Development IJ Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil I1 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP ❑ SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Summerhays,Nita M(WI;`O Technologies) Email Nita.Summerhays@bp.com Printed Name Summ-rhays 'it- M IPRO Technologies) Title Petrotechnical Data Manager i Signat - �i//J���.. Phone +1 907 564-4035 Date 08/12/2015 Form 10-404 Revised 5/2015 T L g�7i ✓• 5It( /),,, RBDMO- t"!" 1 4 2015 ubmitOriginalOnly • • Daily Report of Well Operations PBU X-10A ACTIVITYDATE SUMMARY CTU#3 1.75"coil Objective:Attempt to pull LTP, Set CIBP Latched up @ 9950' Unable to get LPT to release POOH. MU PDS memory string RIH. Tag 12876 CTMD, log up at 50fpm, flag at 12550', log up to 11700'. POOH. Re-PT ctc/mha. MU BOT 2-7/8" CIBP (2.22" running OD). While RIH w/CIBP wt indicator tripped indicating sitting down at 12121' (1'into top perf). Trips were set so light that CCAT showed no graphical change in run in weight. Picked up, pulled 10k over normal up wt, rih tagged at same spot, BOL pumps down CTBS in attempt to rih, well pressured up after 7bbls, offline w/pump and well continue to build WHP while rih, tag same spot at 12121'. Attempted to MIT-T as per APE request to prove LTP integrity. Unable to get MIT-T and had LLR or 0.4bpm at 1135psi. A total of 45bbl of 50/50 in well= FP to 2960' Potentially pre-set CIBP. Plan forward to pu motor/mill/push to bottom then set another CIBP. POOH w/BOT plug run#1 bha. Lay down tools, confirmed 2.875" CIBP was preset/left in hole. MU 7/15/2015 2.34" reverse clutch milling bha, RIH. CTU#3 1.75"coil Objective:Attempt to pull LTP, Set CIBP Mill CIBP @ 12119' CTM/Getting very little motor work after stacking 10 K down POOH P/U a new motor&mill RBIH with new motor&2.33" mill milled thru plug and pushed it to bottom POOH 7/16/2015 to pick up a venturi having over pulls at starting @ 11690' CTU#3 1.75"coil Objective:Attempt to pull LTP, Set CIBP ***Job Continued from WSR 7/15/15*** Mill CIBP @ 12119' CTM/Getting very little motor work after stacking 10 K down POOH P/U a new motor& mill RBIH with new motor&2.33" mill milled thru plug and pushed it to bottom POOH to pick up a venturi having over pulls at starting @ 11690'. POOH and MU 2"Venturi, RIH to 10,230'and venturi down to 12,800'while pumping 1.5BPM. POOH to surface, break down Venturi basket and found it was packed off with metal debris from the CIBP. Clean venturi and re run. 7/16/2015 ***Job Continued on WSR 7/17/15*** CTU#3 w/1.75" CT Objective: Venturi CIBP debris, Log, set CIBP ***Job Continued from WSR 7/16/15***Stab on well with venturi BHA. RIH to 9,900 and come online down CT at 1.5 BPM, venturi down to 12,820'then POOH. At surface w/venturi found another slip segment and more big chunks of metal. Third run came back with metal shavings no 7/17/2015 big chunks of metal. RIH w/PDS/GR/CCL in 2.20" carrier&2.30" nz ***Job in progress*** CTU #3 w/1.75" CT Objective: Venturi CIBP debris, Log, set CIBP ***Job Continued from WSR 7/16/15***Stab on well with venturi BHA. RIH to 9,900 and come online down CT at 1.5 BPM, venturi down to 12,820'then POOH. At surface w/venturi found another slip segment and more big chunks of metal. Third run came back with metal shavings no big chunks of metal. RIH w/PDS/GR/CCL in 2.20"carrier&2.30" nozzle. RIH to 12,800 and perform 5 min stop, start logging up at 50 FPM, Flag pipe with yellow/blue paint at 12,650'E CTMD and stop for 5 min. PUH @ 50 FPM to 11,700, 5 min stop then POOH at 80 FPM. Pop off well 7/17/2015 and break down tools standby for PDS to download data. ***Job continued on WSR 7/18/15*** CTU#3 w/1.75" CT Objective: Venturi CIBP debris, Log, set CIBP ***Job Continued from WSR 7/16/15***Stab on well with venturi BHA. RIH to 9,900 and come 7/17/2015 online down CT at 1.5 BPM, venturi down to 12,820'then POOH. CTU#3 w/1.75" CT 5 Objective: Lo Set CIBP 9, ***Job Continued form WSR 7/17/15***Continue to standby for PDS to download data. MU BOT 2- 7/8" CIBP and RIH. PDS log complete, -2'correction. RIH to flag, correct depth to ME at 12,653.1', RIH to 12,720 and then PUH to plug setting depth of 12,700. Load and launch 1/2" ball, plug sheared at 25bbls away. RIH and tag plug with 2k down. POOH. Top of plug at 12,699.6. 7/18/2015 ***Job in Progress*** • S Daily Report of Well Operations PBU X-10A CTU#3 w/1.75" CT Objective: Log, Set CIBP ***Job Continued form WSR 7/17/15*** Continue to standby for PDS to download data. MU BOT 2- 7/8" CIBP and RIH. PDS log complete, -2'correction. RIH to flag, correct depth to ME at 12,653.1', RIH to 12,720 and then PUH to plug setting depth of 12,700. Load and launch 1/2" ball, plug sheared at 25bbls away. RIH and tag plug with 2k down. POOH. Top of plug at 12,699.6. Freeze protect well w/38 bbls of 50/50 Methanol. RDMO 7/18/2015 ***Job complete*** Fluids Summary BBLS Type 762 1% KCL W/SAFE LUBE 90 50/50 METH 852 Total • • m a 0 0 0 0 0 0 4 6 O N N CO CV 'Cr LO O 00 L() U CO O 0 0 0 0 0 0 0 0 i co N- 'Cr N N 3 (A O CO N r CO O m co r co cp 00 O CA I� CO CO CO CO Ln V co O O O (T CS) CO N CO I- CO O 0") CA moi' N CO CO 00 CO CO CO CO I I I I I I I I I H N 10 C0 CO LO O CO 10 CO C)) 0) N CO CO I,- CO CO CO ti O co CO CO CO CO N- MO N O — N 'Cr M co (s.) CO CO O O 'Cr O CO CO coCD 0 O O C.) 111111111 < 0 N CO 'C' O co — L0 N coCD co M o o co X r r L a_ I— LC) aO O OCO CO 000 COCO0 O 0 I O O C3) - J J 00 00 J J J _ N � *kJJ *k *k *k M O L!) N Cl) x � (0 60) C)) O O co O 00 a0 N N N = CO LnF-- el o t +-' co M D O V CO CO M r-- 00 00 CO ti COCr) CO 6) N co (A O J w Z Ct Q O c w -6 ° 0 co D 00u_ CtO CCCCCCW Z Z w O w w w w m O D H a Z Z Z Z J UCnZ0 JJJJH IHEE=• 4-1/16"CM/ III 1,M.ELLI-EAD-=CNV 7'SLFLOCK -X 1 OA s --Afil NOTES:""WELL ANGLE>70-@ 10a50 """ MAX DOGLEG:30.6-@ 12854""" 4-1/2"CHROME TBG ACTUATOR= BAKER C I• V B.EI_EV= 74.94' %dip . II % 44! BF.ELEV= 40.79' 0 KOP= 3100. "CONDUCTOR, II . 'I. • tA R IP 2120' -4-1/2'HES X NP,D=3.813" Max Angle= 106'..• 11067 ---0, ' P . , 411' be Datum MD= 10591' 13' • . CabJmTVD= 8800'SS , . .4 Ii, V 4 2699' _19-5/8"IN PKR 9-5/8'CSG STUB(04/30/13) - 1702' i V GAS LIFT MAM:RELS 13-3/8"CSG,72#,L-80,13=12.347" - 2677' -41 .! A ST MD TVD DEV TYPE VLV LATCH PORT IIA IE r; 5 3227 3221 15 KEIG.2.DOW BK 16 '04/23/15' r•I: 4 5458 5010 42 K8G2 SO BK 20 04/23/15 Minimum ID = 2.37" @ 9950' L°fl 3 7219 6249 46 103(32 'MY BK 0 01/30/15 3-1/2" BKR KB LTP 14 2 8581 7254 38 1(13(32 DAV BK 0 01/30/15 Lo: 1 9610 8107 34 K8G2 DMY BK 0 01/30/15 A . s,r4 *STA 113=OMY HAS EXT: : PACKING _A 9770' -14-1/2"HES X NP,ID=3.813' ' A 0- 9794' -TX 4-1/7 HES TNT PKR,ID=3.856' .: *,_•: 1 Itl .1- 991T -I4-1/2"I IM X NP 0=3.813' T SCAB LNR 264,L-80 VAM TOP HC. - 9918' .0383 bpf,0=6.276" 1:11 .1. TOP OF T LNR - 9918' - " 9960' -i45 KB BKR LTP,13=2.3T(03/08/15)I •1 ii111.• 995T H3.70"BKR DEPLOY SLV,D=locr TOP OF 3-1/7 LNR/CEMENTH) 9957' ...I;III 9979• H3-1/2"011S X NP,D=2,812 1 " 1 I 4 ,.ii 4-1/2"TBG, 12.6#,13CR-85 VAM TOP, - 10006' ()it' ;%-,;11 Sle ;„Iro 9993' -4-1/7 FES XN MP, .0152 bpf,ID=3,958MLLED TO 180'(02J01/15) BEHIND " itftld rx; L 9-5/8"CSG,47#,L-80 BTRS,ID=8.681" - 10433' 1-4 - 4 5 4-4 i 0 10006' -4-1/2'WEG,ID=4.00" CT LNR ‘ 1 eV V * 4 V 3-1/7 LM ,9.3#,L-so s-n__, H 10489' Ad ‘0, 141. ow 10489' -3-1/2 X 3-3/16'XO,ID=2,7;;" 1 .0087 bpf,ID=2.992 I I 1. ‘0. IN .,• Pj TX 4-1/7 DELTA W-f:STOCK-2143(02/24/15) 10632' ivtip$ 4 (W/RA TAG ., 10641) ,f.! Keg IVILLOUT VVIIDOW(X-10A) 10635'- 10644' 434 . „ T LNR,29#,L-80 BTRS,.0371 bpf,13=6.184" - -10632 j .-21.c, ,-l )._ 3.625"BKR GEN II W-IFSTOCK w/2 RA TAGS 10688'? ?',41t1,.No.., --AN ';i: •4:11ZN,. 11361 -3-3/16 X 2-7/8"XO,0=2.377" 0,...4,;?„•4t.„ 10'FROM TF-E TOP(02/01/15) - • •;',.:•"`' 1;ei -"b... N % ,,, '4-4, R3RFORA TUN SUMMARY % W .4 1‘;.% N•• 12700' ELM -2-7/8'BKR "I LOG:SLB ON 03/07/15 ilYel i fli l& -*,Or CEP(7/18/15) rie- t,., rZ. ANGLE AT TOP PERF:88'g 12120' 606.%.41e. 4 #%# %'••••., Note:Refer to Production DB for historical perf data %,_ 129:i.:• - PBTD .,,,,, %..... SIZE SF. INTERVAL Opn/Sqz SHOT SQZ 2' ' 6 12120- 122200 03/09/15 3-1/4"LNR,6.6#L-80 TC11, 11361' -N----dolb,#1 4111111111) ., 2" 6 12425- 12675 0 03/09/15 .0079 bpf,ID=2,85' '‘.1.4, ••.• 2" 6 12750-12775 C 03/09/15 • 4 ,...,...• cs.• 2" 6 12830- 12870 C 03/09/15 • FSI-t PALLED&RSI-ED CP(07/16/15) H 12864"CUM .41 2-7/8'LNR,6.54,L-80 STL,.0058 bpf,ID=2.44" -f 13032' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUCHOE BAY UNIT 07/28/80' IMTIAL COMPLETION 03/28/15 T13/PJC R3TD CEPTH CORRECTION WELL: X-10A 12/15/90 N1 RWO 04/15/15 DJ/PJC FINAL ODE A FFROVAL PE3R4T No:"2150040 05109/13 0-14 MO 05/04/15 TJHJI.43 GLV CIO(04/23/15) AR No: 50-029-20467-01 03/10/15)4oRac i CTD SICETRACK4X-10A) 08/12/15 JLS/J1‘83 SET CSRFISH(07/16-18/15) SEC 7,T1ON R14E, 476'FNL&479'FEL 03/16/15 PJC 'DFLG HO COFRECTIONS 03/26/15. PJC LTC FIFE SPECEIGATIONS BP Exploration(Alaska) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. c S - 0 0 ti- Well History File Identifier Organizing(done) Two-sided ❑ Rescan Needed RESCAN: OVERSIZED: NOTES: Color Items: E Maps: Grayscale Items: s: ❑ Poor Quality Originals: ❑ Other: ❑ Other: aft BY: Date: qi ) // 5 /s/ rYi Project Proofing BY: C. Maria Date: (a/f& 5 /s/ I Scanning Preparation 3 x 30 = qo + lira' =TOTAL PAGES { 0 Y BY: Maria Date: (p k I ^ /5. IV r(1(Count does not include cover sheet) i /s/ Production Scanning Stage 1 Page Count from Scanned File: I O7 (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: YES NO BY: < Maria Date: Io f I!2J/5' Is/ Illf Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Stage 2 Additional Well Reports: YES NO TOTAL PAGES: Digital version appended by: Meredith Michal Date: /s/ Final Page Count: Stage 1 + Stage 2: TOTAL PAGES: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: /s/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc 1 • - O • . • 9 Ce O I W O I W • cv O -- CO O d 0 a W J W J H H O. O z \ c o o > x O OI JI Z JI z _UI UI Y H QLI Q = 2 >; N 0 NI CL CL ui vi 0 co Z u)I Z (I)I mI m b o _ I 0 I O @ a) a) X a U o I cX 0 H > aNH>• > j 7 7 M I- d N -Z ai0 M I I I a o UI Z Z ' m m O E U v Lo Ln Ln m N To c c c c OI 0 0 0 0 �I ..I 2 Qco N LL LL WI LLl < W N 04 NI LO 03 ml o 2 o 0 0 o W LL-LL d Q Q Q Q Q Q Q p a) IU) a) v v o 0 0 J ` O X X X X = 'Q N D X O X O O) X O X 0-o X X X C) 0 g c' CD a) m o p (p Z Y U I a _i- N )(n E N(n Y i(n 4- N f.9. N N li Z , fO E U LL it L= O LLIUI it it WW' m W I- W d W H LL it it Q (0 d E o c.) o g ao� 00= o o 1 Y• o 1UI a 1 Y o 1UI o o v w N E c c c 'c c c 'c c2 H c c CC H 'c r c c 'c ` Y m , o O O O O o w ojm o OOo oO2 oOU oO2 2 2 2 •N < J V N _N N aa)i ,_w N o1 X01 N N o1=I N o101 N o1=1 N of pl N _N _N LL Q W W W W NI W N W W -m W J W 00 W J W W W O z0 U a Ln LO LO Ln a . Y ; 0000 0 00 0 0 0 000 Ww O N N N N N N N N N N N N N t7 Ln to t!7 LO LO In O (0 y N N N N N N N N N N N N N Ce CO M CO M M CO M M M CO M M M a Q W W J 2 2 V m o 00 Z o 8 a N ICC m _ 0 0 co Co y 3 (6 M J O. OO a) C ZI c r a rco in oIP COO co G ca 0 N N -8_ a) O O E a V M O E w CO CO c a J ' ° Q a m co 7 en I— K (a a H u-, 0 m Z o J2 2 > N J N CO Q 0 CO m M U J N O a) C4 o O (n Q aocc Q a 1 cr o Z E O Z U Q 0 m0 O to E -J CO Z j U) N a) CO c) CO CO -0 CO (0 (0 CO CO CO (0 CO (0 v c E p O 0 O m0 O O 0 0 0 O O O co co reZ To o m m 2 To o m m co o To o' m O O O 0 O _1 0 O O O O O O O O O 0 z o w ,- 0 0 M CO CO CO CO V V V . V -' V V V O H Ira l0 Q W co a0 a0 co co co co co W W co co co In Q z • c ' W 3 LO LU) L LO LO ID LL) LO Lf) CO LO U) LU) LLf� 2O Wm z N N N N N N N N N N N N N N N re 5 L_ 10 Q O V .�, Q r) Z13 w .: .9. .�LL w co o w Z W 0 0 2 U U U U U U U U U U U U U U v E J � 0 rn °o. 3 : o. O O O O °) 0 O O 0 0 0 O O O Q acc 01- -1e � wLu W LU w w LU w w w rq o QI W ii) C %/ o I _ J a z LLI z O • co O >- >- > C11 _I N U Z �I Qo cI Q O o rn >; o Q LL N d r a >, 6 � To 44) I > ~ X o O z ~ I c a _ m Q i Z �I E 8I 8I WI o o Z 3 N 0 } c� LO } U d 0 Q 1 a' a' Q N N N Q 0) 0) O 1 mLL co J a a O m 2 2 al 2 111 1 OW 0 0 J V O 1' N�I ..�I Y Q m 0 .0 . 0 Q 1 Zitw U Q Q C Ncs IY o V f0ln 00 00 00 a� a) 1 7 ECLF.. ECC — .?Lu L CCoLu E --C U) 8<I_II y <1 I i0nw aa))Q1 m<I y¢I inw E CO r ce Q N W O m W �� N 2 W� W� W� N 2 co Q N O ` W ZO • 11 u� �n �n �n a a TOO CO O m F U 'o 0 0 0 o E X E .' p W a N N N N CV I0 7 Q in in V) Z a) IX O N N N N N J CO CO V 7 fl ii E W wrn vi V m Q 1 E E z . 0) 0) Q o v fx cm 'w u) VI O — O J �. co C J m v E 7 O 2 0 U ato o 0 0 0 N COp E r 0 ,..- o r. cc © } ^ E 0NQc E r 0 0V a I— x o E co ~ "' o I— = 0 co) N c N 0) Q d Q N E CO CO c g 1' E W �_ O m c 0) w p ici Q c cO p co 41:1C n rt o r O. m c E Ts n • a .o 03 O O• E > £ U c Q 2 Q co coA 0 U Z u) co f6 0) N 07 l0 0) N In d Q Q co aa) Q Q Q N C N ch m ca 2 m m m 2 O ( ^ o a0 .5 .� O) .5 .5 .o) O) ''O O } Q Q J Q Q Q J E 0 C M o Q LIJ O 0 F co co co o o o o ,C > f0 f)C N I(N (N (N (N u> to u� W € n O N N N N N N N N d W p \ N C G N OQ Z 6 � M 10 O Cr 1' V a O CyZ H 0) Q O QrO M d 1 Q O 5 L.)U 0 0 0 0 0 0 g ai) m Iv .o E ' at E -o o g 0 y O Q1 LL a 2 w 0 ° 0 0 0 JO 3 Z 0 a` 0 V 0 c p O I V 9 O T N O O r. I T O z -'� N CVo U I v O us vl '8 c `� Z '.4,...... F. I J '1/4...4k - VPi z N 7 y 6 a+ N co N u) N Z 7 0 W o 1 Ce J a W w J V m o I Z Q d co I I J a. co aUl 5 TO a) N p UE I o CD JM Q 0.aco z o 2N CO CO M Cl)p ° N 1 ) x 1 • O Qiiiii a a> Q C a 1 Z 0 E ea 1 z m 3 T c o) c 1 o >m c F13 in d d N 11 > N a' G M o H v 0+ M C 10 C..) E a v E o E E o F , Zl 5 Hunt, Jennifer L (DOA) From: Lastufka,Joseph N <Joseph.Lastufka@bp.com> Sent: Friday, May 08, 2015 2:09 PM To: Hunt, Jennifer L (DOA) Subject: PBU X-10A/ PTD#215-004 Hi Jennifer, Please reference the following well: Well Name: PBU X-10A Permit#: 215-004 API #: 50-029-20467-01-00 Date of Test: 4/28/2015 Type of Test: IPT (Initial Production Test) Choke Size: 176 Choke Unit: Deg Production Method: Gas Lif Duration (Hours Tested): 6 Top Reference (Top Perf MD): 12120' Bottom Reference (Bottom Perf MD): 12870' Tubing Flowing (Pressure): 235 Casing Pressure: 1320 Total Test(Rate f/O, W, G): 26/979/ 192 24-Hour Rate (0, W, G): 105/ 3916/769 Gravity (Oil, API): 23.8 Deg GOR (Gas-Oil Ratio): 7322 This well began Production on: 4/27/2015 Method of Operations on this date: Gas Lift 1 RBDMS \\ MAY 1 2 2015 O WSW CVF C9o0 a Q o p N z aID m U o r- a X a) Q o�2 O 0 0 y a a OL L C iro y I— T X Y O y U N ; O O O O O wa _o O D H _ co 4+ CO T Q a 0 J N M in N to t (1') N ccoo O a E L m L U J r r y CD 0 a 1... • W W < t4 CV t98. C , c2 2 2 2 E 2 E 2 a LL E -o `° a s 1� rd, N O M L— to M L C > z N N N N N Nen O co a) Q a Q4 . O 0 a OU y OC ~ a > L 'D 9 ~ 7a1 }' fD 3 0 0 0 0 0 0 0 0 0 O3v 5 L c J J J J J J J J J W W W W W W W W W pOp , co 0 O _ •°, LL LL LL LL LL LL LL LL LL N a1 E -o v) 'sJ J J J J J J J J a_ 0 C C a a a a a a a a a Z • Z Z Z z z Z ZZZ 'LJ 0 O] LL LL LL LL LL LL LL LL LL a1 L U LJ K - a O y j N U E ., a _ O O E ai a O Z vi 0- a1 -p O m • c O O a a) C O V -- J O az F a a L > it coa ; o ; LLLL1- ° - mom J 0 0 E X 0 w - 0 o LL 3 cc re 0 a F a a V w , ct LL a Q f/) CC W N cn = Ems• O J s Fw- O d O 0 -+ a a m j a 1- .... PI 0 ell LU Q) S °' y eo ;.•. r r r r cc ct cc re cc ,i M W ✓ > • J O O O J O O J J CO�!S11. w EEE 2 m m m m m Z m Z a w w w w w ix w E Zi O O O Q Y O O 0 O 3 oaaOao ov) C) -, a L Q' w' d' Q' Q' Q' W en ` n. aa a s a c ° Ln Oa T CL • G U COCD 0 to to to N- COa0 Co M v CV N N O in 0 in t0 co O O O O 0 0 0 N f0 T� '0 0 0 0 0 0 0 0 0 0 — _ W OOOOoO 000nh " 6-- � cr, -, aco oa) comm E W Q w * 40 C)ci 0 0 0 0 0 CO x ea Cr a p O O O M N 0 tp O 0 0 0 0 0 0 0 0en N N12— 6) N V 1- r t() - O O 1- CO M cthth :., M c0 (0 M N CO 'et IO 0 N. O M M N O O M M, to N _ N N N N N N N N N 1Z O) OT Q 0)) ) 0) O T O 0 N N N N N N NNN Q1 0 0 0 0 0 0 0 0 0 aJ OO O O O O O O O 0 to to to to 1f) to LO 15) 4, 0 v L c Q u C z • u > c �i `: a E �Z• w Y 8 s n U m a ii a ' � aaob � m ooa r E LA00 M M N r r t,!) O ns• C aN LL J J Z K J J £ Z j Ifi ^ C C% ea H a RECEIVED STATE OF ALASKA APR 0 2 2015 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LO cPGCC la. Well Status: - E Oil El Gas 0 SPLUG 0 Other ❑Abandoned ❑Suspended 1b. Well Class 20AAC 25.105 20AAC 25.110 0 Exploratory 0 Stratigraphic El GINJ El WINJ ❑WAG 0 WDSPL El Other No. of Completions One E Development 0 Service ~ 2. Operator Name: 5. to Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. . 3/10/2015 . 215-004 - 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 • 2/25/2015 50-029-20467-01-00 ' 4a. Location of Well(Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number Surface: .3/4/2015 PBU X-10A • 475' FNL,479' FEL, Sec. 07, T1ON, R14E, UM • 8. KB(ft above MSL): 74.94 15. Field/Pool(s) Top of Productive Horizon: 635' FNL, 1590' FWL, Sec. 17,T1ON, R14E, UM GL(ft above MSL): 38.87' - Prudhoe Bay/Prudhoe Bay - Total Depth: 9. Plug Back Depth(MD+TVD) 9' FNL, 2191' FWL, Sec. 17,T1ON, R14E, UM 12995' ' 8984' • 4b. Location of Well(State Base Plane Coordinates, NAD: 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 665417 • y- 5939643 - Zone- ASP4 13032' ' 8984' ' ADL 028313&047475 - TPI: x- 667624 y- 5934252 Zone- ASP4 11. SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 668209 Y- 5934891 Zone- ASP4 None 18. Directional Surve y: E Yes ❑ No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1950' 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD/GR/RES, GR/CCL . 10635' . 8910' • 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20"x 30" Insulated Conductor 34' 114' 34' 114' 36" 8.6 cu yds Arcticset 13-3/8" 72# L-80 34' 2677' 34' 2677' 17-1/2" 3813 cu ft Permafrost II 9-5/8" 47# L-80 1702' 10433' 1702' 8755' 12-1/4" 1521 cu ft Class'G', 130 cu ft Permafrost C 7" 29# L-80 9918' 10635' 8355' 8910' 8-1/2" 480 cu ft Class'G' 7" 26# L-80 Surface 9918' Surface 8355' Tieback 1929 sx Class'G' 3-1/2"x3-1/4"x2-7/8" 9.3#/6.6#/6.5# L-80 9950' 13032' 8380' 8984' 4-1/4" 211 sx Class'G' 24. Open to production or injection? E Yes 0 No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/TVD) (MD+TVD of Top&Bottom; Perforation Size and Number): 2"Gun Diameter,6 spf 4-1/2", 12.6#, 13Cr85 10006' 9794'/8256' ;*,:....---,,.ri......:.... 26. ACID, FRACTURE,CEMENT SQUEEZE,ETC. 12120'-12220' 8989'-8994' 12425'-12675' 8993'-8985' DAJ WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes E No 12750'-12775' 8983'-8983' .31 l t 5 .,� DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 12830'-12870' 8983'-8984' VEt�t!F 2500' Freeze Protect w/40 Bbls Diesel v{J 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 4 1 28. CORE DATA Conventional Core(s)Acquired? ❑Yes Z No Sidewall Core(s)Acquired? 0 Yes E No • If Yes to either question, list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions,core chips, photographs and laboratory analytical results per 20 AAC 250.071. None Form 10-407 Revised 10/2012 CONTINUED N REVERSE Submit Original Only V._ 5 f 805 „ex- '�� RBDMS. - APR - 9 2015 s-y 29. GEOLOGIC MARKERS(List all formations and r kers encounter 30. FORMATION TESTS NAME TVD Well Tested? es ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Ivishak-Zone 4B 10720' 8974' None • Shublik(Invert) 12037' 8991' Ivishak-Zone 4B(Revert) 12123' 8989' Formation at Total Depth: Zone 4B 12123' 8989' 31.List of Attachment Summary of Daily Drilling Reports,Well Schematic Diagram, Surveys,Cement Report 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Travis Boltz,564-5750 Email: Travis.Boltz@bp.com Printed Name: Title Drilling Technologist Joe Lastufka Signature: Phone 5644091 Date: q4/15 INSTRUCTIONS General. This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13. The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval) Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump, Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only TREE= 4-1/16"CAN X-1 OA SAFE ITES:"'WELL ANGLE>70"@ 10850"•-" WB.LHEAD=CM/T SL�OCX PJC D R - 1T MAX L_-LEG:30.6"@ 12854"""4-1/2"CHROME TBG ACTUATOR z BAKER C ' --- OKB.ELEV= 74.94' �yi 1 BF.ELEV= 40.79' * . ; KOP= 3100' — TOR ? I + y i' 2120' I.-14-1/2"HES X NP,D=3.813" Max Angle= 106'@ 11062' _#,_' I I �. Datum ND= 10591' D= *. s Datum TVD= 8800 SS w . * __._.... v _ 2589' I-I9-5/8'DV PKR i 9-5/8"CSG STUB(04/30/13) 1702' r, ND GAS LFT MAREL S • 13-3/8"CSG,72#,L-80,D=12.347' '•«2677' + ST MD TVD DEV TYPE VLV LATCH PORT DATE f 5 3227 3221 15 KBG2 DMY BK 0 01/30/15 4 5458 5010 42 KBG2 DMY BK 0 01/30/15 Minimum ID = 2.37" @ 9950' �: 3 7219 6249 46 KBG2 ' Y BK 0 01/30/15 3-I/2" BKR KB LTP 1 *MY 8581 7254 38 KBG2 DMY BK 0 01/30/15 1 9610 8107 34 KBG2 DMY BK 0 01/30/15 • *STA#3=DMY HAS EXTENDED PACKING r. I i 9770' H4-1/2'HES X NP,D=3.813" r7 4 .%' 9794' HT'X 4-1/2"HES TNT PKR D=3.856" \s•i 406 7"SCAB LNR 26#,L-80 VAM TOP HC, - 9918' III , 9917' N4 1/2•HES X ,D=3.813' .0383 bpf,D=6.276" TOP OF 7"LNR 9918' 9950' -145 KB BKR LTP,D=2.37'(03/08/15) TOP OF 3-1/2"LNR/CEMENTED -{ 9957' I - Pod 9967' -13.70"BKR DEPLOY SLV,D=3.00" 1 o• 9978' -1 3-1/2'OTIS X NP,D=2.812" 11 4 .Al 4-1/2"TBG,12.6#,13CR-85 VAM TOP, 10006' •4e N., .40 V, 9993 0006' 9993 }--4-1/2"HES XN NP, .0152 bpf,D=3.958" Ia PALLED TO 3.80"(02/01/15)- BEHIND 9-5/8"CSG,47#,L-80 BTRS,D=8.681" -I 10433' }--4 44:4r ,XIP 1 — 1/2"wLEG,D=4.00" CT LNR • 3-1/2"LNR 9.3#,L-80 STL, - 10489' Imo# I_, 10489' -13-1/2 X 3-3/16'XO,D=2.786" .0087 bpf,D=2.992 % i 4j, i 7 X 4-1/2"DELTA W-IPSTOCK-2ND(02/24/15) 10632' Fit j (W/RA TAG@ 10641') A MLLOUT WINDOW(X-10A) 10635"-10644' T LNR,29#,L-80 BTRS,.0371 bpf,D=6.184" -I -10632 3.625'BKR GEN II HPSTOCK w/2 RA TAGS 10688'? . 1,WNitpiiiik. +N 10'FROM THE TOP(02/01/15) �� 11361' -13-3/16 X 2-7/8"XO,D=2.377" PERFORATION SUMMARY f 'k REF LOG:SLB ON 03/07/15 .Y.i.t...+ #`#� ANGLE AT TOP FERE:88°@ 12120' •~ — •�• +a `�. 12989' H PBTD Note:Refer to Production 1:8 for historical perf data _ .` SIZE SPF INTERVAL Opn/Sqz SHOT SOZ NY., � � 2' 6 12120-12220 O 03/09/15 3-1/4"LNR 6.6#L-80 TC11, 11361' 2" 6 12425-12675 0 03/09/15 .0079 bpf,ID=2.85" 2" 6 12750-12775 0 03/09/15 2" 6 12830-12870 0 03/09/15 it 2-7/8"LNR,6.58,L-80 STL,.0058 bpf,C=2.44" H 13032' [ATE REV BY COMMENTS DATE REV BY COM UITS PRUIDHOEBAY tNT 07/28/80 INITIAL COMPLETION 03/28/15 TB/PJC FBTD DEPTH CORRECTION WELL: X-10A 12/15/90 M E5 RWO FERMI No: `2150040 05/09113 D-14 RWO API No: 50-029-20467-01 03/10/15NORDIC 1 CTDSIDETRACK(X-10A) SEC 7,T1ON,R14E, 476'FNL&479'FE_ 03/16/15 PJC DRG HO CORRECTIONS 03/26/15 PJC LNR PPE SPECIFICATIONS BP Exploration(Alaska) North America-ALASKA-BP Page 1 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00 @74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/20/2015 09:30 - 18:30 9.00 MOB P PRE BACK RIG OFF F-39L1 -STAGE ON PAD HUDDLE UP WITH SECURITY -MOVE SATELITTE OFFICE TO X PAD -TOOLPUSHER AND DRILLER CONDUCT ROUTE DRIVE -BEGIN RIG MOVE TO X-10A -ACCEPT RIG AT 18:30 18:30 - 00:00 5.50 BOPSUR P PRE -PERFORM BARRIER TEST. -NIPPLE DOWN TREE CAP. NIPPLE UP BOPE. -FINISH RU OF AUXILLARY EQUIPMENT 2/21/2015 00:00 - 02:30 2.50 BOPSUR P PRE FINISH NIPPLING UP BOPE PERFORM RIG EVACUATION DRILL PERFORM PRE SPUD WITH NIGHT CREW 02:30 - 10:00 7.50 BOPSUR P PRE PERFORMED PASSING SHELL TEST. CALLED AOGCC REP BOB NOBLE. HE WAIVED WITNESS AT 02:30 AM PERFORM BOPE TEST STATE GIVEN NOTIFICATION OF BOPE TEST 02/19/2015 17:26 STATE INSPECTOR BOB NOBLE WAIVED WITNESS 02/21/2015 PRESSURE TEST ALL BOP EQUIPMENT AS PER AOGCC REGS,PTD#215-004,AND CRT-AK-10-45 -TEST BOPE TO 250/3500 PSI FOR 5/5 CHARTED MIN -TEST CHOKE VALVES,CHOKE AND KILL HCR VALVES,INSIDE MANUAL VALVES ON CHOKE AND KILL LINES,BOP RAMS AND ANNULAR PREVENTER -ALL 2"PIPE RAMS TESTED WITH 2"TEST JOINT -2-3/8"PIPE RAMS TESTED WITH 2-3/8"TEST JOINT -BLIND RAMS TESTED ON OPEN HOLE -ANNULAR TESTED WITH BOTH 2-3/8"AND 2" TEST JOINT -TEST FULL OPENING SAFETY VALVE -FUNCTION BOPE FROM BOTH REMOTE PANELS -TEST GAS ALARMS -PERFORM DRAW DOWN TEST OF ACCUMULATOR -ALL TESTS WITNESSED BY WSL OR TOUR PUSHER 10:00 - 11:15 1.25 BOPSUR P PRE PRESSURE TEST PACK-OFF/INNER REEL VALVES -BOOT E-LINE WITH RUBBER GROMMET -PUMP 8 BBLS MEOH AHEAD OF WATER -PRESSURE TEST 250/3500 FOR 5/5 CHARTED MIN Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 2 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM i Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA ,UWI:500292046700 Active datum:12:10 7/6/1980 00:00 @74.94usft(above Mean Sea Level) Date From-To Hrs Task I Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 11:15 - 14:00 2.75 BOPSUR P PRE PERFORM SLACK MANAGEMENT -PUMP SLACK BACK INTO REEL -CUT OFF SLB COIL CONNECTOR -CUT 50'(DID NOT FIND E-LINE) I-PUMP SLACK FORWARD OUT OF REEL -INSTALL SLB COIL CONNECTOR -HEAD UP WITH BHI(UQC/LQC) PULL TEST/PRESSURE TEST CONNECTION 14:00 - 15:45 1.75 BOPSUR P PRE INSTALL BHI CHECKS PRESSURE TEST 250/3500(FAIL) -CHANGE OUT CHECK AND RE-TEST(FAIL) • -CHANGE OUT CHECK AND RE-TEST(PASS) 15:45 - 16:15 0.50 BOPSUR P PRE PERFORM H2S/RIG EVAC DRILLS 16:15 - 19:30 3.25 BOPSUR P PRE PULL TWC -HELD PJSM FOR PULLING TWC -LOAD LUBRICATOR ONTO THE RIG FLOOR -INSTALL&TEST LUBRICATOR ON WELL • -PULL TWC WITH 0#PSI PRESSURE ON WELLBORE. RECOVERED TWC WITH RUBBER SEAL INTACT. -CLEAN AND CLEAR RIG FLOOR OF VALVE CREW EQUIPMENT - 19:30 - 20:00 0.50 BOPSUR P PRE INSTALL NIGHT CAP. PT QTS. GOOD TEST -PERFORM 30 MINUTE FLOW CHECK. PJSM • FOR BHA MAKE UP 20:00 - 21:00 1.00 DRILL P WEXIT MAKE UP BHA#1 WINDOW MILL AND STRING REAMER BOTH 3.81"GO/3.80"NO GO -PT QTS 21:00 - 00:00 3.00 DRILL P WEXIT RIH. TAKING 60/40 METHANOL FREEZE PROTECT TO TIGER TANK CONTINUE TO CIRCULATE. PERFORM 1 FORMATION TIE TO PDC LOG. -5' CORRECTION. RIH FOR DRY TAG AT 10689'DOWN. 2/22/2015 00:00 04:45 4.75 DRILL P WEXIT CIRCULATING 8.6 PPG POWERPRO SURFACE TO SURFACE. • i GET SPR'S FREE SPIN 2150#@ 2.69 BPM 8.67 PPG IN/8.62 PPG OUT MINIMAL MOTOR WORK. 3-4K WOB. MILLING CEMENT 04.45 - 06:00 1.25 STMILL N DFAL 10,710.00 WEXIT ,NOT FINDING PINCH POINT. PICK UP TO TIE IN AGAIN. 10710' 'CALL ODE 06:00 - 08:30 2.50 STMILL N DFAL 10,710.00 WEXIT DID NOT TAG WHIPSTOCK AT PROPOSED SETTING DEPTH: RE-LOG TIE IN WITH(-1')DEPTH CORRECTION -TAG BOTTOM AFTER DRILLING CEMENT @ 10,711'MD -LOG CCL UP INTO TUBING TAIL 08:30 - 10:00 1.50 STMILL N DFAL 10.710.00 WEXIT DISCUSS OPTIONS WITH TOWN TEAM -REVIEW ORIGINAL LOGS OF WELLBORE -CORRELATE AWGRS DATA VS ORIGINAL DATA -DEVELOP PLAN FORWARD DECISION MADE TO MILL AHEAD TO 10,745' 1-DECISION Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 3 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM Rig Release:3/10/2015 Rig Contractor NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00 @74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 13:00 3.00 STMILL N DFAL 10,710.00 WEXIT MILL 3.80"CEMENT F/10,710'-10,745'MD -BPM IN/OUT:2.57/2.55 CIRC PSI:2000 -MW IN/OUT:8.65 PPG/8.63 PPG -ECD/ANN/PVT-9.37/4295/339 -WOB:1-2K "`MILL CEMENT AT A HIGH RATE.CEMENT DRILLS LIKE CONTAMINATED CEMENT*** -START SEEING MOTOR WORK-10,726'MD. -WOB INCREASE F/0.5-2.64K -SLIGHT LOSSES SEEN Q-10,725'MD(-8 BPH) 13:00 - 15:00 2.00 STMILL N DFAL 10,710.00 WEXIT POOH WITH MILLING ASSEMBLY -BPM IN/OUT:3.17/2.37 CIRC PSI:1831 -MW IN/OUT:8.65 PPG/8.63 PPG -FLOW CHECK 15:00 - 15:30 0.50 STMILL N DFAL 10,710.00 WEXIT LD MILLING ASSEMBLY -STAND INJECTOR BACK -LD MILLING BHA/INSPECT MILLS -GAUGE MILLS-3.80"GO 3.79"NO GO 15:30 - 17:45 2.25 STMILL N DFAL 10,710.00 WEXIT PROGRAM PDS LOGGING TOOLS -LOAD PDS CALIPER TOOLS ONTO RIG -SURFACE TEST CALIPER TOOL(FAIL) LOWER TOOL/TROUBLESHOOT -MU CALIPER TOOLS(GOOD TEST) 17:45 22:00 ' 4.25 • STMILL N DFAL - 10,710.00 WEXIT RIH WITH PDS ASSEMBLY -BPM IN/OUT:1.46/1.88 CIRC PSI:1011 -MW IN/OUT:8.65 PPG/8.63 PPG -LOGGED FORMATION TIE IN. -10' CORRECTION. -RIH, SAT DOWN EARLY AT 10717'. PUH ABOVE CEMENT. 22:00 - 00:00 2.00 STMILL N DFAL 10,710.00 WEXIT -PDS ARMS OPENED AT 22:11. LOG 50'/MIN FROM 10717'TO 10500'. WAIT FOR ARMS TO CLOSE. PERFORM FLOW CHECK. GOOD FLOW CHECK. -POOH 2/23/2015 00:00 - 01:30 1.50 STMILL N DFAL 10,710.00 WEXIT -POOH WITH CALIPER -FLOW CHECK, BREAK DOWN BHA. -PDS DOWNLOADED TOOL. GOOD DATA. HEAD TO SHOP TO UPLOAD 01:30 - 04:30 3.00 STMILL N DFAL 10,710.00 WEXIT STAND-BY FOR TOWN -PDS DATA PARTIAL. HALF THE FINGER, NO DATA AFTER WE PULLED OUT OF CEMENT SHEATH -CALL PDS OUT FORA RERUN. 04:30 - 07:30 3.00 STMILL N DFAL 10,710.00 WEXIT -STAND-BY FOR PDS TO ARRIVE. HAVING TO REBUILD ATOOL 07:30 - 08:30 1.00 STMILL N DFAL 10,710.00 WEXIT PROGRAM PDS LOGGING TOOLS LOAD PDS CALIPER TOOLS ONTO RIG -SURFACE TEST CALIPER TOOL -MU CALIPER TOOLS(GOOD TEST) 08:30 - 11:00 2.50 STMILL N DFAL 10,710.00 WEXIT RIH WITH PDS ASSEMBLY -BPM IN/OUT:t64/1.98 CIRC PSI:1205 -MW IN/OUT:8.65 PPG/8.63 PPG -LOGGED FORMATION TIE IN. -9' CORRECTION. 11:00 - 11:30 0.50 STMILL N DFAL 10,710.00 WEXIT RIH TO LOGGING DEPTH OF 10,686'MD -WAIT FOR CALIPER TO OPEN -BPM IN/OUT:1.64/1.58 CIRC PSI:1168 I i -MW IN/OUT:8.62 PPG/8.62 PPG Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 4 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3-016NN-C:(4,037,839.00) --I Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12.00.00AM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00 @74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:30 - 12:00 0.50 STMILL N DFAL 10,710.00 WEXIT LOG 7"CASING WITH PDS CALIPER -LOG F/10,686'-10,400'MD -WAIT ON TOOL TO POWER OFF 12:00 - 13:45 1.75 STMILL N DFAL 10,710.00 WEXIT POOH WITH PDS TOOL -BPM IN/OUT:1.55/1.36 CIRC PSI:1172 -MW IN/OUT:8.65 PPG/8.63 PPG i-PVT:281-228 FLOW CHECK 13:45 - 14:15 0.50 STMILL N DFAL 10,710.00 WEXIT DOWNLOAD PDS CALIPER TOOL DATA -VERIFY DATA FROM TOOL -SEND DATA TO TOWN FOR PROCESSING 14:15 - 21:30 7.25 STMILL N DFAL 10,710.00 WEXIT WAIT ON LOGGING DATA -LOAD&INSPECT WHIPSTOCK -MU WHIPSTOCK AND GET ON WELL -19:00 PDS EMAILED DATA -21:00 OCN#4 RIH SET WHIPSTOCK 21:30 - 23:30 2.00 STMILL N DFAL 10,710.00 WEXIT RIH WITH WHIPSTOCK PER OCN#4 23:30 - 00:00 0.50 STMILL N DFAL 10,710.00 WEXIT PERFORM TIE IN-6 CORRECTION. RIH. VERIFY ON DEPTH AT TSGR. 2/24/2015 00:00 - 01:30 1.50 WHIP N DFAL 10,710.00 'WEXIT -PUH TO NEUTRAL WEIGHT AT 10650' 0 DEG ORIENTATION. -CLOSE EDC. PRESSURE UP TO 3200#. SHEARED RUNNING TOOL. WHIPSTOCK SET. -STACK 4K ON WHIPSTOCK. GOOD SET -TOWS AT 10632' -BOWS AT 10650' -RA TAG AT 10641' 01:30 - 03:00 1.50 WHIP N DFAL 10,710.00 ' WEXIT POOH WITH RUNNING ASSEMBLY BREAK DOWN BHA. EVERYTHING RECOVERED 03:00 - 04:00 1.00 WHIP N DFAL 10,710.00 WEXIT MAKEUP BHA#5 GAUGE MILL AND STRING REAMER 3.80"GO/3.79"NO GO -STAB INJECTOR 04:00 - 07:00 3.00 WHIP N DFAL 10,710.00 WEXIT RIH WITH MILLING BHA -BPM IN/OUT:1.42/1.92 CIRC PSI:875 -MW IN/OUT:8.59 PPG/8.63 PPG -LOG TIE-IN(-5.5')DEPTH CORRECTION -RECORD SLOW PUMP RATES 07:00 - 09:00 2.00 STMILL P WEXIT MILL 3.8"WINDOW F/10639'-10,640'MD• -BPM IN/OUT:2.80/2.48 CIRC PSI:2040 -MW IN/OUT:8.64 PPG/8.63 PPG -WOB/IA/PVT:0.5-1 K/-9/252 -LOSS RATE AT START OF MILLING:-12 BPH 09:00 - 11:00 2.00 STMILL P WEXIT MILL 3.8"WINDOW F/10640'-10,642'MD -BPM IN/OUT:2.76/2.63 CIRC PSI:2123 -MW IN/OUT:8.63 PPG/8.61 PPG -WOB/IA/PVT:2K/-9/202 -LOSS RATE 13 BPH 11:00 - 13:00 2.00 STMILL P WEXIT MILL 3.8"WINDOW F/10642-10,644'MD -BPM IN/OUT:2.78/2.67 CIRC PSI:2172 -MW IN/OUT:8.64 PPG/8.62 PPG -WOB/IA/PVT:3K/-9/299 -LOSS RATE 4-7 BPH Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 5 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date.3/4/2015 X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00 i74.94usft(above Mean Sea Level) Date From-To Hrs I Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 15:00 2.00 STMILL P WEXIT MILL 3.8"WINDOW F/10644'-10,645.5'MD -BPM IN/OUT:2.76/2.66 CIRC PSI:2219 -MW IN/OUT:8.64 PPG/8.61 PPG -WOB/IA/PVT:1-2K/-9/284 -LOSS RATE 7 BPH 15:00 - 16:20 1.33 STMILL P WEXIT MILL 3.8"WINDOW F/10644'-10,645.5'MD BPM IN/OUT:2.76/2.66 CIRC PSI:2208 MW IN/OUT:8.64 PPG/8.61 PPG I-WOB/IA/PVT:1-2K/-9/276 -LOSS RATE 7 BPH 16:20 - 17:30 1.17 STMILL P WEXIT WINDOW MILL EXITED THE BOTTOM OF THE WINDOW AT 10647.5',8.5'WINDOW CONTINUE MILLING AT 1 FPH TO GET THE STRING MILL ACROSS THE BOTTOM OF THE WINDOW THEN START MILLING THE RAT HOLE -BPM IN/OUT:2.76/2.68 CIRC PSI:2153 -MW IN/OUT:8.63 PPG/8.61 PPG -WOB/IA/PVT:0.69 K/-9/275 -LOSS RATE 7 BPH 17:30 - 18:45 1.25 STMILL P WEXIT START MILLING 10'OF RAT HOLE 18:45 - 19:35 0.83 STMILL P WEXIT MILLING RAT HOLE -BPM IN/OUT:2.79/2.72 CIRC PSI:2373 -MW IN/OUT:8.64 PPG/8.61 PPG -WOB/IA/PVT:4.53 K/-9/265 19:35 - 21:30 1.92 STMILL P WEXIT MILLED 15'OF RAT HOLE,PU AN START REAM PASSES FINISHED REAMING PASSES. NO ISSUES COME OFFLINE. DRY DRIFT. NO ISSUES I OPEN EDC POOH BPM IN/OUT:3.39/2.81 CIRC PSI:2241 -MW IN/OUT:8.64 PPG/8.62 PPG -WOB/IA/PVT:0 K/-9/211 21:30 - 00:00 2.50 STMILL P WEXIT OUT OF HOLE. BREAK DOWN BHA 3.78" NOGO/3.79 GO 2/25/2015 00:00 - 04:00 4.00 DRILL P PROD1 PERFORM CHROME MANAGEMENT -CUT 110'COIL/CABLE -INSTALL CTC, PULL TEST TO 35K -MAKE UP BHI. -PT/CHART CHECK VALVE TEST. MAKE UP BHA#6 04 00 - 06:00 2.00 DRILL P PROD1 -RIH WITH BUILD BHA 06 00 - 06:30 0.50 DRILL P PROD1 -AT TIE IN DEPTH. SHUT PUMPS DOWN. CLOSE EDC -TIE IN-9'CORRECTION 06:30 - 06:45 0.25 DRILL P PROD1 OBTAIN SPR'S Printed 3/18/2015 1:28:22PM North America-ALASKA-BP Page 6 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA I UW:500292046700 Active datum:12:10 7/6/1980 00:00 @74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) 06:45 - 07:40 0.92 DRILL P us PROD1 ON BOTTOM DRILLING FREE SPIN=2265 PSI AT 2.87 BPM RATE IN=2.88 BPM RATE OUT=2.80 BPM LOOSING 0.08 BPM OR-5 BPH MW IN=8.67 PPG MW OUT=8.65 PPG ECD =9.48 PPG ROP=60 FPH WOB=2.70 K CIRC PSI= 2611 PSI IAP=0 PSI OAP=0 PSI PVT=316 BBLS CHECK CASING VALVES TO ENSURE THE IA& OH ARE OPEN TO THE SENSORS,AND THEY ARE 07:40 - 08:35 0.92 DRILL P PROD1 DRILLING AHEAD THEN STALLED,PU AND STARTED LOSING A LITTLE MORE FLUID LOSING-0.4 BPM BUT SLOWLY COMING BACK,ZERO OUT MM TO CHECK BOTTOMS UP WE ARE GOOD ON FLUIDS 312 BBLS IN THE PITS AND 325 BBLS ON TRUCKS CALL DRLG SUPT CALL FOR ANOTHER CLEAN TRUCK TO PU MORE MUD BOTTOMS UP WAS CLEAN,NO CHANGE IN DENSITY EMPTY 35 BBLS OFF VAC TRUCK AND SEND OFF FOR MORE MUD 08:35 - 09:05 0.50 DRILL P PROD1 CONTINUE DRILLING AHEAD FREE SPIN=2265 PSI AT 2.87 BPM RATE IN=2.88 BPM RATE OUT=2.80 BPM MW IN=8.67 PPG MW OUT=8.65 PPG ECD =9.48 PPG ROP=60 FPH WOB=2.70 K CIRC PSI= 2611 PSI IAP=0 PSI OAP=0 PSI PVT=328 BBLS 09:05 - 09:20 0.25 DRILL P PROD1 STOP DRILLING,FIRST SURVEY SHOWS WE ARE BEHIND-5°ON OUR BUILD BUT THE SURVEY QUALITY IS NOT 100% ROP IS INCREASING TO 100+FPH,ENTERING Z4.FASTER ROP WILL MAKE IT HARDER TO GET THE BUILD WE NEED IN A SOFT FORMATION ASKED DD TO CHECK WITH GEO TO SEE IF WE CAN AFFORD TO LAND A LITTLE LOW BUT I THINK WE STILL NEED TO SEE A CLEAN SURVEY BEFORE MAKING A DECISION TO PULL OUT AND ADJUST THE MOTOR 09:20 09:30 0.17 DRILL P PROD1 I CONTINUE DRILLING WITH REDUCED RATE TO TRY AND GET MORE BUILD OUT OF THE MOTOR 09:30 - 10:00 0.50 DRILL P PROD1 CONTINUE DRILLING AHEAD FREE SPIN=2265 PSI AT 2.87 BPM RATE IN=2.70 BPM RATE OUT=2.48 BPM 'LOSS RATE_-13 BPH MW IN=8.68 PPG MW OUT=8.65 PPG ECD =9.48 PPG ROP=130 FPH WOB=2.70 K CIRC PSI= 2611 PSI IAP=0 PSI OAP=0 PSI PVT=326 BBLS Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 7 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00 t 74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 10:35 0.58 DRILL P PROD1 DD NEEDS TIME TO CHECK SURVEYS BUT WE HAVE MADE UP 2°IN THE BUILD WITH THE LOWER PUMP RATE GEO WANTS TO PU AND LOG TIE INTO THE SAG THEN LOG THE RA MARKER ON THE WS 10:35 - 10:45 0.17 DRILL P PROD1 CORRECT DEPTH+1'AND RIH TO CONTINUE DRILLING 10:45 - 11:50 1.08 DRILL P PROD1 BACK ON BOTTOM DRILLING LOOSING A LITTLE MORE FLUID FREE SPIN=2265 PSI AT 2.87 BPM RATE IN=2.70 BPM RATE OUT=2.36 BPM LOSS RATE=-20 BPH MW IN=8.67 PPG MW OUT=8.70 PPG ECD =9.50 PPG ROP=150 FPH WOB=3.70 K CIRC PSI= 2936 PSI IAP=0 PSI OAP=0 PSI PVT=316 BBLS 11.50 - 12:55 1.08 DRILL P PROD1 CONTINUE DRILLING AHEAD BACK ON THE PLAN,INCREASE RATE FREE SPIN=2265 PSI AT 2.87 BPM RATE IN=2.81 BPM RATE OUT=2.25 BPM LOSS RATE=-33 BPH MW IN=8.68 PPG MW OUT=8.65 PPG ECD =9.48 PPG ROP=113 FPH WOB=2.44 K CIRC PSI= 2490 PSI IAP=0 PSI OAP=0 PSI PVT=2.89 BBLS IN RATE=2.80 BPM 10,965'OUT RATE=2.20 LOSS RATE AT-36 BPH 11,020'OUT RATE=2.04 LOSS RATE AT-46 BPH DD SAYS WE WILL BE LANDED AT 11,060'AND WILL NEED TO TRIP TO ADJUST THE MOTOR, PREP TO FILL PITS FOR TOOH 12:55 - 13:05 ] 0.17 DRILL P PROD1 BUILD LANDED,PUH TO CLEAR THE OH VOLUME THEN RIH TO TD LOSS RATE=48 BPH,FLOW CHECK WELL 13:05 - 13:10 0.08 DRILL P PROD1 FLOW CHECK WELL 13:10 - 13:30 0.33 DRILL P PROD1 GOOD NO FLOW,POOH TO THE WINDOW 13:30 - 13:35 0.08 DRILL P PROD1 ABOVE THE WINDOW,SHUT DOWN THE PUMP TO FLOW CHECK THE WELL AND OPEN THE EDC 13:35 - 15:30 1.92 DRILL P PROD1 GOOD NO FLOW,JET ACROSS THE WS TRAY THEN POOH 15:30 - 15:40 0.17 DRILL P PROD1 HOLD PJSM WHILE POOH TO LD&PU THE BHA'S FLOW CHECK WELL 15:40 - 16:00 0.33 DRILL P PROD1 GOOD NO FLOW,TAG UP,REMOVE THE INJECTOR AND LD THE BHA BIT GRADE=1-1 16:00 - 16:15 0.25 DRILL P PROD1 BHA OOH,ADJUST MOTOR FOR LATERAL SECTION 16:15 - 16:45 0.50 DRILL P PROD1 MU LATERAL BHA Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 8 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:OOAM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00 @74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:45 - 17:00 0.25 DRILL P PROD1 PU THE INJECTOR,MU TO THE BHA AND STAB ON 17:00 - 17:15 0.25 DRILL P PROD1 PT THE QTS 17:15 - 19:00 1.75 DRILL P PROD1 GOOD PT,RIH 19:00 - 21:00 2.00 DRILL P PROD1 GEO CALLED WANTED LONG TIE IN FROM RA MARKER LOG FROM 10620'TO 10800' -10 CORRECTION. 21:00 - 22:00 1.00 DRILL P PROD1 DRILL LATERAL SECTION 11060'TO 11176' FREE SPIN=2311 PSI AT 2.81 BPM RATE IN=2.81 BPM RATE OUT=1.83 BPM MW IN=8.74 PPG MW OUT=8.70 PPG ECD =9.49 PPG ANNULAR BHP=4400# MW TEMP IN=91 DEG MW TEMP OUT=97.3 DEG BHCT=154 DEG ROP=116 FPH WOB=2.9 K CIRC PSI= 3347 PSI IAP=0 PSI OAP=CEMENTED PVT=215 BBLS LOSS RATE AT-60 BPH 22:00 - 23:00 1.00 DRILL P PROD1 DRILL LATERAL SECTION 11176'TO 11268' FREE SPIN=2311 PSI AT 2.81 BPM RATE IN=2.98 BPM RATE OUT=1.92 BPM MW IN=8.72 PPG MW OUT=8.75 PPG ECD =9.51 PPG ANNULAR BHP=4416 MW TEMP IN=90.8 DEG MW TEMP OUT=95.7 DEG BHCT=152 DEG ROP=92 FPH WOB=2.9 K CIRC PSI= 3347 PSI IAP=0 PSI OAP=CEMENTED PVT=215 BBLS LOSS RATE AT-60 BPH 23:00 - 00:00 1.00 DRILL P PROD1 DRILL LATERAL SECTION 11268'TO 11395' FREE SPIN=2311 PSI AT 2.81 BPM RATE IN=2.85 BPM RATE OUT=1.94 BPM MW IN=8.71 PPG MW OUT=8.73 PPG ECD =9.51 PPG ANNULAR BHP=4385# MW TEMP IN=94.9 DEG MW TEMP OUT=97.3 DEG BHCT=156 DEG ROP=127 FPH WOB=2.9 K CIRC PSI= 3347 PSI IAP=0 PSI OAP=CEMENTED PVT=215 BBLS LOSS RATE AT-60 BPH Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 9 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3 016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 1 Spud Date/Time:7/6/1980 12:00:00AM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00 @74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/26/2015 00:00 - 01:00 1.00 DRILL P PROD1 DRILL LATERAL SECTION 11395'TO 11500' FREE SPIN=2311 PSI AT 2.81 BPM RATE IN=2.85 BPM RATE OUT=1.94 BPM MW IN=8.71 PPG MW OUT=8.73 PPG ECD =9.51 PPG ANNULAR BHP=4412# MW TEMP IN=94.9 DEG MW TEMP OUT=97.3 DEG BHCT=156 DEG ROP=127 FPH WOB=2.9 K CIRC PSI= 13347 PSI IAP=0 PSI OAP=CEMENTED DRILLED 450. PERFORM LONG WIPER TO WINDOW LOSS RATE AT-60 BPH 01-00 - 03:00 2.00 DRILL P PROD1 -PERFORM LONG WIPER/TIE IN. -SLB FOUND RETAINING PIN ON CHAINS BROKE. PULL INTO TUBING TAIL. PUMP BOTTOMS UP. -PJSM WITH NORDIC, SCHLUMBERGER, WSL. GO OVER PROCEDURE WHILE WAITING TO GET BOTTOMS UP 1 -LO/TO POWER PACK. CLOSE UPPER PIPE/SLIPS. PUSH PULL PER PROCEDURE. SHUT DOWN POWER PACK. REPLACE PIN 03:00 - 04:00 ' 1.00 DRILL P - PROD1 I RIH TO 10600'. CLOSE EDC. 1-PERFORM TIE IN AT RA MARKER +3' CORRECTION 11684.70' CORRECTED DEPTH. 04:00 - 06:00 2.00 DRILL P PROD1 DRILL LATERAL SECTION 11500 TO 11700' FREE SPIN=2140 PSI AT 2.70 BPM RATE IN=2.92 BPM RATE OUT=1.70 BPM MW IN=8.64 PPG MW OUT=8.77 PPG ECD =9.46 PPG ANNULAR BHP=4385# MW TEMP IN=97.7 DEG MW TEMP OUT=97.9 DEG BHCT=154 DEG ROP=150 FPH WOB=2.9 K CIRC PSI= 3347 PSI IAP=0 PSI OAP=CEMENTED UNABLE TO MAKE TURN, DUE TO VERY i LOW WOB. POOH TO INCREASE MOTOR BEND LOSS RATE AT-60-70 BPH 06:00 - 06:10 0.17 DRILL P PROD1 FLOW CHECK WELL ABOVE WINDOW 06:10 - 07:55 1.75 DRILL P PROD1 GOOD NO FLOW POOH 07:55 - 08:00 0.08 DRILL P PROD1 FLOW CHECK WELL 08:00 - 08:30 0.50 DRILL P PROD1 GOOD NO FLOW,PU THE INJECTOR AND LD THE BHA 08:30 - 08:45 0.25 DRILL P PROD1 BHA OOH,FUNCTION TEST BOPE FROM RIG FLOOR CONTROLS 08:45 - 08:55 0.17 DRILL P PROD1 HOLD PJSM TO PU THE BHA 08:55 - 09:15 0.33 DRILL P PROD1 MU THE BHA,PU THE INJECTOR AND MU TO THE BHA THEN STAB ON 09:15 - 09:30 0.25 DRILL P PROD1 PTTHEQTS 09:30 - 11:15 1.75 DRILL P PROD1 GOOD PT RIH 11:15 - 11:30 0.25 DRILL P PROD1 LOG TIE IN 111:30 - 12:10 0.67 DRILL P PROD1 CORRECT DEPTH-10.5'AND RIH Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 10 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA ••UWI:500292046700 Active datum:12:10 7/6/1980 00:00 @74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) I (usft) 12:10 - 12:25 0.25 DRILL P PROD1 TAG BOTTOM,PU AND OBTAIN SPR'S 12:25 - 13:05 0.67 DRILL P PROD1 BACK ON BOTTOM DRILLING FREE SPIN=2161 PSI AT 2.88 BPM RATE IN=2.79 BPM RATE OUT=2.06 BPM LOSS RATE=-44 BPH MW IN=8.54 PPG MW OUT=8.58 PPG ECD _,=9.34 PPG ROP=150 FPH WOB=2.98 K CIRC PSI= 2490 PSI IAP=0 PSI OAP=CEMENTED 13:05 - 13:25 0.33 DRILL P PROD1 CONTINUE DRILLING FREE SPIN=2161 PSI AT 2.88 BPM RATE IN=2.70 BPM RATE OUT=1.64 BPM LOSS RATE=-65 BPH MW IN=8.53 PPG MW OUT=8.58 PPG ECD =9.33 PPG ROP=150 FPH.WOB=2.00 K CIRC PSI= 2362 PSI IAP=0 PSI .OAP=CEMENTED 13:25 - 13:35 0.17 DRILL P PROD1 CONTINUE DRILLING FREE SPIN=2161 PSI AT 2.88 BPM RATE IN=2.60 BPM RATE OUT=1.43 BPM 4 LOSS RATE=-70 BPH MW IN=8.53 PPG MW OUT=8.58 PPG ECD =9.33 PPG ROP=150 FPH WOB=2.00 K CIRC PSI= 2362 PSI IAP=0 PSI OAP=CEMENTED 1335 - 14:20 0.75 DRILL N DPRB 11,823.00 PROD1 11823 STACKED Wr THEN OUT RATE WENT FROM 1.4 BPM TO 0.30 BPM PU AND TRY TO DRILLA COUPLE FT TO ENSURE THE THEIF ZONE IS OPEN RETURNS TRYING TO HEAL UP BUT COULD JUST BE PACKING OFF 'TAG BOTTOM LOSSES INCREASING DRILLED 2'PU AND NO RETURNS,POOH TO THE WINDOW LINE UP ACROSS THE TOP TO KEEP THE HOLE FULL AND PULL TO THE WINDOW CURRENTLY WE HAVE 200 BBLS IN THE PITS, ,580 BBLS ON 2 TRUCKS,290 BBLS IN TRANSIT AND 290 BBLS AT THE PLANT LOOKING FOR ANOTHER EMPTY TO PICK IT UP AND BRING TO LOCATION 14:20 - 14:35 0.25 DRILL N DPRB 11,823.00 PROD1 ABOVE THE WINDOW,SHUT DOWN PUMP 2 MGOING DOWNB THE COIL WHILE FILLING THE HOLE ACROSS THE TOP TO ESTABLISH A STATIC&DYNAMIC LOSS RATES STATIC =96 BPH DYNAMIC=180 BPH 14:35 - 15:40 1.08 DRILL N DPRB 11,823.00 PROD1 CALL ODE WITH LOSS RATES START MIXING HIGH VIS KCL AND SECURE ENOUGH TRUCKS TO CONTINUE DRILLING OPERATIONS AND WO L2 OCN 15:40 - 21:00 5.33 DRILL N DPRB 11,823.00 PROD1 WE HAVE TH L2 OCN TO CONTINUE OPS ONCE WE HAVE ENOUGH FLUID ON LOCATION AND A VERBAL APPROVAL FROM THE DRLG SUPT WO FLUIDS 21:00 - 22:00 1.00 DRILL N DPRB 11,823.00 PROD1 FLUIDS ARRIVE. START TIE IN+2. RUN TO BOTTOM. Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 11 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM 'Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00 @74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) _ 22:00 - 23:00 1.00 DRILL P PROD1 GET SPR'S. START DRILLING -CURRENT LOSS RATE 2.9 BPM DOWN COIL. .1 DOWN BACKSIDE -DRILLED TO 11834'. ENCOUNTERED FULL LOSSES. INCREASE PUMP RATE ACROSSED THE TOP TO 3.5 BPM. WHILE PUMPING 2.8 BPM DOWN THE COIL. PULL TO WINDOW. 23:00 - 00:00 1.00 DRILL N DPRB 11,823.00 PROD1 CALL SUPERINTENDENT AND ODE. 2/27/2015 00:00 - 01:30 1.50 DRILL P PROD1 -DISCUSS WITH ODE OPTIONS. DECISION I MADE TO RIH AND DRILL AHEAD TO SEE IF LOSSES HEAL. -11834' 2.70 BPM DOWN COIL, 1.32 BPM ACROSS TOP. RETURN RATE OF.36 BPM. LOSS RATE 3.66 BPM -11855 2.70 BPM DOWN COIL, 1.32 BPM ACROSS TOP. RETURN RATE OF.34 BPM. LOSS RATE 3.68 BPM -11864' 2.68 BPM DOWN COIL, 1.33 BPM ACROSS TOP. RETURN RATE OF.24 BPM. LOSS RATE 3.77 BPM -11869' 2.64 BPM DOWN COIL, 1.33 BPM !ACROSS TOP. RETURN RATE OF.10 BPM. LOSSRATE 3.87 BPM -11883' 2.76 BPM DOWN COIL, 3.03 BPM ACROSS TOP. RETURN RATE OF.40 BPM. LOSS RATE 5.39 BPM -11884' 2.80 BPM DOWN COIL, 2.89 BPM ACROSS TOP. RETURN RATE OF 0 BPM LOSS RATE 5.69 BPM -11886' 2.81 BPM DOWN COIL, 2.89 BPM ACROSS TOP. RETURN RATE OF 0 BPM LOSS RATE 5.70 BPM INCREASE RATE ACROSS TOP. :-11889' 2.76 BPM DOWN COIL, 2.91 BPM ACROSS TOP. RETURN RATE OF 0 BPM LOSS RATE 5.70 BPM PULL TO WINDOW -11750' 2.78 BPM DOWN COIL, 3.57 BPM ACROSS TOP. RETURN RATE OF 0 BPM LOSS RATE 6.35 BPM DISCUSSION WITH ODE. START PREPPING FORA LCM PILL CALL MUD ENGINEER Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 12 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00©74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) _ 01:30 - 06:00 , 4.50 DRILL N DPRB 11,834.00 PROD1 -AT WINDOW 10598'OPEN EDC. START BACKING PUMPS TO MINIMUM TO KEEP HOLE FULL -01:40: 1.80 BPM DOWN COIL, 3.2 BPM ACROSS TOP. RETURN RATE OF.27 BPM. LOSS RATE OF 4.73 BPM -01:50: 1.25 BPM DOWN COIL, 3.2 BPM ACROSS TOP. RETURN RATE OF.30 BPM. LOSS RATE OF 4.10 BPM -01:55: 1.25 BPM DOWN COIL, 3.2 BPM ACROSS TOP. RETURN RATE OF.45 BPM. LOSS RATE OF 3.99 BPM -02:00: 1.00 BPM DOWN COIL, 3.2 BPM ACROSS TOP. RETURN RATE OF.45 BPM. LOSS RATE OF 3.75 BPM -02:05: 0.75 BPM DOWN COIL, 3.2 BPM ACROSS TOP. RETURN RATE OF.60 BPM. LOSS RATE OF 3.35 BPM -02:20: 0.66 BPM DOWN COIL, 2.8 BPM ACROSS TOP. RETURN RATE OF.35 BPM. LOSS RATE OF 3.14 BPM -03:05: 0.68 BPM DOWN COIL, 2.8 BPM ACROSS TOP. RETURN RATE OF.44 BPM. LOSS RATE OF 3.04 BPM -03:40: 0.67 BPM DOWN COIL, 2.8 BPM ACROSS TOP. RETURN RATE OF.50 BPM. LOSS RATE OF 3.02 BPM -04:15: 0.66 BPM DOWN COIL, 2.66 BPM ACROSS TOP.RETURN RATE OF.34 BPM. LOSS RATE OF 2.98 BPM -05:00: 0.66 BPM DOWN COIL, 2.71 BPM ACROSS TOP, RETURN RATE OF.34 BPM LOSS RATE OF 3.03 BPM MI DRAFTING POLYSWELL PROCEDURE. 06:00 - 13:00 7.00 DRILL N DPRB 11,834.00 PROD1 WAIT ON APPROVAL TO PUMP POLYSWELL LCM STILL LOSING 3.0 BPM 2.64 BPM DOWN THE BACKSIDE AND 0.70 BPM DOWN THE COIL WITH 0.34 BPM RETURN RATE 13:00 - 16:15 3.25 DRILL N DPRB 11,834.00 PROD1 PREP PITS FOR POLYSWELL 16:15 - 16:35 0.33 DRILL N DPRB 11,834.00 PROD1 HOLD PJSM TO PUMP POLYSWELL PILL 16:35 - 17:10 0.58 DRILL N DPRB 11,834.00 PROD1 CHECK STATIC&DYNAMIC LOSS RATES STATIC LOSS RATE=2.45 OR 147 BPH DYNAMIC LOSS RATE=5.5 BPM OR 330 BPH 17 10 - 18:00 0.83 DRILL N DPRB 11,834.00 PROD1 READY TO PUMP PILL SHUT DOWN PUMP#1 ;CLOSE THE CHOKE AND KILL LINE VALVE 17:12 ON LINE WITH 20 BBL MUD SPACER 17:15 MIX POLYSWELL IN MUD 17:17 SWAP TO 33 BBLS POLYSWELL 17:28 SWAP TO 10 BBL MUD SPACER,GOT 30 BBLS OF POLYSWELL '17:32 SWAP TO KCL FOR DISPLACEMENT AND OPEN THE KILL LINE VALVE 17:35 CAUGHT FLUID IN 6.5 BBLS 17.44 PS ATTHETZ 18:00 - 18:30 0.50 DRILL N DPRB 11,834.00 PROD1 i 140 BBLS KCL IS AT THE THIEF ZONE NO PRESSURE SEEN ON WH OPEN CHOKE AND INCREASE RATE ACROSS THE TOP TO KEEP THE HOLE FULL Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 13 of 28 Operation Summary Report Common Wet Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 1X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA I UWI:500292046700 Active datum:12:10 7/6/1980 00:00©74.94usft(above Mean Sea Level) Date From-To Hrs 1 Task 1 Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:30 - 18:50 0.33 DRILL N DPRB 11,834.00 PROD1 STILL TAKING 3.6 BPM TO KEEP THE HOLE FULL ACROSS THE TOP COME ONLINE WITH PUMP DOWN TEH COIL TO CHECK DYNAMIC LOSS RATE DYNAMIC LOSS RATE=5.6 BPM OR 336 BPH CALL ODE 18:50 - 21:00 2.17 DRILL N DPRB 11,834.00 PROD1 POOH TO LD THE BHA AND PREP TO PUMP ANOTHER PLOYSWELL PILL FROM SURFACE 21:00 - 00:00 3.00 DRILL N DPRB 11,834.00 PROD1 PJSM. DISCUSS KEEPING HOLE FULL WHILE PULLING BHA. -PULLED BHA OUT, STAND-BACK. INSTALL NIGHT CAP. CONTINUE TO PUMP ACROSS TOP. -GETTING FLUIDS ROUNDED UP. TAKING-5 BPM TO MAINTAIN RETURNS. 2/28/2015 00:00 - 01:40 1.67 ( DRILL N DPRB PROD1 -TRUCKS BACKED UP AT MI, WAIT ON FLUID SUPPORT. 01:40 - 02:30 0.83 DRILL N DPRB PROD1 -FLUIDS ARRIVED. MUD PUMP#1 HAVING ISSUES. BRING PUMP 1 DOWN. AND INCREASE RATE ON PUMP 2 TO MAINTAIN HOLE FILL. CURRENT LOSS RATE AT • SURFACE 4.5 BPM PJSM. GO OVER PROCEDURE FOR BULLHEADING POLYSWELL. 02:30 - 06:00 3.50 DRILL N DPRB PROD1 -02:34 CLOSE CHOKE. 4.25 BPM LOSS WHILE PUMPING ACROSS TOP. -ON 8.6PPG POWERPRO SPACER(20 BBLS) PUMPING 4.8 BPM ZERO IN RATE. -ON 20 PPB POLYSWELL PILL(30 BBLS) -ON 8.6 PPG POWERPRO SPACER(10 BBLS) -ON 1%KCL -SWAP TO BOTH PUMPS. INCREASE RATE TO 6 BPM WELLHEAD 40 PSI POLYSWELLAT THIEF WELLHEAD PRESSURE UP TO 150 PSI/4BPM (205 BBLS AWAY) 1-221 BBLS AWAY LOSING WELLHEAD ;PRESSURE -241 BBLS AWAY LOST WELLHEAD • PRESSURE(1%KCL AT THIEF) OPEN CHOKE -ESTABLISH A RATE AT WHICH WE CAN KEEP HOLE FULL. 5.0 BPM AT 03:45 POLYSWELL IN PLACE -04:15 LOSS RATE 4.36 BPM -04:30 VISCOSIFIED 1%KCL AT THIEF. 4.25 BPM LOSS RATE. -05:00 CALL ODE. ROUND UP EVERYTHING _ TO PUMP MORE POLYSWELL 06:00 - 08:35 2.58 DRILL N DPRB PROD1 WAITING FOR KCL,VAC TRUCK IS AT THE HOT WATER PLANT FILLING NOW 08:35 - 09:00 0.42 DRILL N DPRB PROD1 1 RECEIVED OCN#8 WITH CORRECTED VOLUME WAIT ON APPROVALS FROM WTL&ETL 09:00 - 09:20 0.33 DRILL N DPRB PROD1 HOLD PJSM TO BULL HEAD POLYSWELL LCM PILL Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 14 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:OOAM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00 @74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:20 - 1025 1.08 DRILL N DPRB PROD1 HOLE FILL RATE=4.0 BPM WITH 0.35 RETURN RATE,LOSS RATE=3.65 BPM OR 219 BPH CLOSE CHOKE AND LINE UP TO PUMP AT 5 BPM DOWN THE KILL LINE 09:25 ONLINE WITH 20 BBL NEAT MUD SPACER,WHP=16 PSI 09:27 POLYSWELL IS WET 09:29 SWAP TO 55 BBL POLYSWELL PILL 09:40 REDUCE RATE TO GET AS MUCH LCM OUT OF PIT 3 09:41 SWAP TO 10 BBL NEAT MUD SPACER ANDINCREASE RATE BACK TO 5 BPM,WHP= 44 PSI 09:54 WHP HAS INCREASED TO 157 PSI 09:57 WHP=201 PSI 10:00 176 BBLS AWAY,LEAD OF 20 BBL MUD SPACER AT THE WINDOW,WHP=242 PSI 10:04 197 BBLS AWAY,20 BBL MUD SPACER AT THE THIEF ZONE,WHP=234 PSI AND DROPPING 10:08 217 BBLS AWAY,55 BBL POLYSWELL PILL AT THE THIEF ZONE,WHP=184 PSI AND STARTING TO RISE •10:09 228 BBLS AWAY,11 BBLS PS IN THE TZ, WHP=300 PSI AND SLOWLY RISING 10:11 234 BBLS AWAY,17 BBLS PS IN THE TZ, WHP=400 PSI AND RISING 10:12 239 BBLS AWAY,22 BBLS PS IN THE TZ, WHP=487 PSI REDUCE RATE TO 4.4 BPM 10:15 250 BBLS AWAY,33 BBLS PS IN THE TZ, WHP=447 PSI RATE=4.4 BPM 10:18 265 BBLS WHP DROPPING 10:23 282 BBLS AWAY SHUT DOWN THE PUMPS,WHP=324 PSI THEN DROPPED TO 0 ,PSI 10:25 - 10:55 0.50 DRILL N DPRB PROD1 CRACK THE CHOKE OPEN AND MAINTAIN HOLE FILL 10:28 PVT ON VAC TRUCK=90 BBLS PVT IN PIT#1 =28 BBLS MONITOR FLUID LOSS FOR 30-45 MIN AS PER OCN 10:32 NO RETURNS USING CHARGE PUMP, ONLINE WITH PUMP TO FILL HOLE 10:38 PUMPING AT 3.2 BPM GETTING 0.15 RETURNS LOOKS LIKE THE 10 BBL MUD SPACER HAS PUSHED AWAY AND THE KCL IS ABLE TO FLOW BETTER THROUGH THE LOSS ZONE 10:41 OUT RATE STARTING TO INCREASE A LITTLE,UP TO 0.46 BPM STILL PUMPING AT 3.2 BPM ACROSS THE TOP,0 PSI WHP 10:46 IN CREASE RATE TO 3.5 BPM TO MAINTAIN RETURNS,OUT RATE=0.21 BPM 10:50 LOST 90 BBLS IN 25 MIN OR 216 BPH 10:55 - 11:25 0.50 DRILL N DPRB PROD1 LOSSES AARE STEADY AT 207 BPH,DOWN FROM 219 BPH CALL ODE AND DISCUSS CALL DRLG SUPT AND WE WOULD LIKE TO DISCUSS THE NEXT POLYSWELL ATTEMPT Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 15 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00 @74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase ! Description of Operations (hr) (usft) 11:25 - 12:40 1.25 DRILL N DPRB PROD1 1-HR SINCE POLYSWELL WAS ADDED TO THE FLUID IN RATE=4.13 BPM AND LOSS RATE= 3.27 BPM OR 196 BPH I OUT RATE HAS STABILIZED AT 1.32 BPM WITH I4.1 BPM IN RATE LOSSES=2.78 BPM OR 167 BPH, BEFORE TREATMENT LOSSES WERE 3.65 'BPM AND 219 BPH 12:40 - 13:10 0.50 DRILL N DPRB PROD1 CLOSE CHOKE AND CHECK INJECTIVITY FOR NEXT POLYSWELL PILL CHOKE CLOSED IN RATE=4.1 BPM WHP=68 PSI IN RATE=5.1 BPM WHP=132 PSI I LOSS RATE HAS SLOWED A LITTLE 4.1 BPM IN AND 1.32 BPM OUT,LOSS RATE = 2.8 BPM OR 168 BPH_ 13:10 - 16:20 3.17 DRILL N DPRB PROD1 PERFORM FLUID LEVEL TESTS WITH THE WELL SHUT IN.AT THE CHOKE&KILL LINE AND WITH THE CHOKE&KILL LINE OPEN TO SEE HOW FAR THE FLUID IS FALLING SHUT IN CHECKS WERE INCONCLUSIVE, -FLUID LEVEL DIDN'T DROP VERY FAR AS IT WAS BEING PULLED INTO A VACUUM,FLUID LEVEL STAYED AROUND 48'FOR 4 MINUTES PERFORM THE SAME TEST WITH THE CHOKE AND KILL LINES OPEN,TOO MUCH NOISE FROM AIR GOING IN FROM THE CHOKE. LOOKS LIKE WEA RE GOING TO HAVE TO SHUT THE WELL IN,ALLOW THE FLUID TO STOP MOVING TO GET A GOOD FLUID LEVEL, DISCUSS WITH DRLG SUPT&ODE Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 16 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM Rig Release:3/10/2015 Rig Contractor NORDIC CALISTA UWI:500292046700 Active datum:12 10 7/6/1980 00:00 @74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:20 - 18:20 2.00 DRILL N DPRB PROD1 RECEIVED OCN#9 TO PUMP 2ND POLYSWELL CLOSE THE CHOKE,ONLINE AT 5 BPM,WHP= 103 PSI CIRC PSI=282 PSI 16:21 ONLINE WITH 20 BBL MUD SPACER 16:23 POLYSWELL IS WET 16:25 SWAP TO 55 BBLS POLYSWELL PILL 16:35 REDUCE RATE TO GET AS MUCH POLYSWELL OUT OF PIT 3 16:38 SWAP TO 20 BBL TAIL SPACER 16:42 SWAP TO 1%KCL 17:01 197 BBLS AWAY,20 BBL MUD SPACER AT THE THIEF ZONE,WHP=282 PSI AND IS DROPPING 17:05 217 BBLS AWAY,55 BBL POLYSWELL PILLAT THE THIEF ZONE,WHP=256 PSI AND STARTING TO RISE 17:11 247 BBLS AWAY,30 BBLS OF POLYSWELL IN THE THIEF ZONE,SHUT DOWN THE PUMP,OPEN THE CHOKE AND 'ALLOW GRAVITY TO PUSH POLYSWELL IN WHP=446 PSI LINE UP TO PUMP TO AND FROM PIT 1 FOR VOLUME CONTROL PVT=95 BBLS 17:13 START FLUID LEVEL SHOTS 17:16 FLUID LEVELAT-80',1.22 BBLS 17:21 CANT GET A CLEAN READING,SHUT IN THE KILL&CHOKE LINES 17:22 FLUID LEVELAT-100',1.52 BBLS,OPEN LINES 17:29 FLUID LEVEL AT-150',2.28 BBLS,OPEN LINES 17:37 FLUID LEVELAT-210',3.20 BBLS,OPEN LINES CONSULT WITH DRLG SUPT IF FLUID SLOWS DOWN TO START PUMPING TO PUSH A LITTLE MORE INTO THE 17:45 FLUID LEVELAT-240',3.65 BBLS,OPEN LINES 17:50 FLUID LEVEL AT-252',3.84 BBLS,OPEN LINES 17:52 FLUID LEVEL AT-258',3.65 BBLS,OPEN LINES NO MOVEMENT FLUID HAS STOPPED,LINE UP TO PUMP ACROSS THE 18:00 WELL TOOK 5 BBLS TO FILL 18:02 7 BBLS PUMPED PINCH IN THE CHOKE 18:03 WHP STARTING TO CLIMB,IN RATE AT 0.74 BPM OUT RATE=0.52 BPM 18:05 8 BBLS AWAY WHP STEADY AT 88 PSI 18:08 CLOSE CHOKE AND BUILDA LITTLE 'WHP 18:10 SHUT DOWN PUMP AT 300 PSI WHP 18:12 PRESSURE BLED OFF,ONLINE WITH THE PUMP AT 18:17 12 BBLS AWAY AT 366 PSI WHP,SHUT DOWN PUMP AND LINE UP TO FLOW ACROSS THE TOP Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 17 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00 @74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:20 - 18:30 0.17 DRILL N DPRB PROD1 FLOWING ACROSS THE TOP MONITORING THE WELL PIT#1 PVT=83 BBLS 18:26 PIT#1 PVT=83 BBLS 18:30 00:00 5.50 DRILL N WAIT PROD1 'PHASE 3 CALLED FIELD WIDE CONTINUE CIRCULATING ACROSS THE TOP MONITORING THE WELL 18:35 PIT#1 PVT=82 BBLS 18:44 PIT#1 PVT=82 BBLS 19:00 PIT#1 PVT=81 BBLS LOST 1 BBL IN 30 I MIN 19:40 PIT#1 PVT=80 BBLS LOST 1 BBL IN 40 MIN 21:14 PIT#1 PVT=63 BBLS LOST 17 BBLS IN 1 HR 34 MIN 22:14 PIT#1 PVT=51 BBLS LOST 12 BBLS/HR 23:14 PIT#1 PVT=41 BBLS LOST 10 BBLS/HR 3/1/2015 00:00 - 03:00 3.00 DRILL N WAIT PROD1 -CONTINUE PHASE 3 WEATHER -01:14 PVT#1 28 BBLS LOST 13 BBLS/HR -00:45 LOST PRIME ON C-PUMP. SWAP TO BOTH PIT 1 AND 2 IN PVT -01:00 PVT OF 81 BBLS LOSS RATE PICKING UP TO AROUND 90 BPH -01:15 LOSS RATE UP TO 120 BPH. BRING PUMP 1 UP TO MAINTAIN HOLE FILL. -CALL SUPERINTENDENT ABOUT UTILIZING FLUIDS ON LOCATION IN PHASE 3. DECISION WAS TO SHUT WELL IN AND MONITOR PRESSURE. 03:00 - 06:00 3.00 DRILL N WAIT PROD1 -LOSS RATE PRIOR TO SHUT IN WAS 120 BPH -SHUT SWAB VALVE,CHOKE,KILL LINE IN. OPEN WING VALVE TO A TRANSDUCER TO MONITOR WELL PRESSURE. -04:00 WELL PRESSURE 0# -05:00 WELL PRESSURE 0# -05:30 WELL PRESSURE 0# CONTINUE MONITORING WELL PRESSURE Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 18 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00 @74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase i Description of Operations (hr) (usft) 06:00 - 16:30 10.50 DRILL N WAIT PROD1 CONTINUE WOWAND MONITORING THE WELL,WHP=0 PSI FILL OUT RISK ASSESSMENT FOR LOADER OPERRATIONS DURING PHASE 3 CONDITIONS TO CHECK THE PATH FROM THE ENTRANCE OF THE PAD TO THE RIG.HEAVY EQUIPMENT IS COMING TO X-PAD TO CLEAR THE ACCESS ROAD AND ASSIST US IN CLEARING AROUND THE RIG AND WELL HOUSES FOR THE PAD OP. CH2 FILLED OUTA RISK ASSESSMENT FOR HIS TRUCK DRIVERS TO PERFORM WALKAROUND INSPECTIONS ON THEIR TRUCKS AND PREP TO CLEAR SNOW AROUND THE TRUCKS ONCE THE LOADER HAS CLEARED AS MUCH SNOW AS IT CAN FOR THEM.SOME TRUCKS ARE GOING TO REQUIRE VEHICLE EXTRACTION AND THE PROPER NOTIFICATIONS AND PAPERWORK WILL BE FILLED OUT AND DISCUSSED BEFORE ANY WORK STARTS 3 OF THE RUNNING CH2 VAC TRUCKS DEVELOPED GLYCOL LEAKS LAST NIGHT DURING THE BLOW AND ABOUT 1 CUP OF GLYCOL LEAKED ON TO THE GROUND FROM ONE AND ABOUT QT FROM THE OTHER.THE LEAKS ARE CONTAINED AND WILL BE CALLED INTO 5700 BY CH2 MANAGEMENT AND REPORTED 1630 - 18:00 1.50 DRILL N WAIT PROD1 WE ARE NOW IN PHASE 1 LEVEL III BUT WE ARE STILL TRYING TO GET 5 OF 8 VAC TRUCKS FIXED AND OR UP AND RUNNING. WELL PRESSURE IS STILL AT 0 PSI ON THE WING VALVE WITH THE SWAB CLOSE& NIGHT CAP ON. 18:00 - 23:00 5.00 DRILL N WAIT PROD1 LOST ANOTHER CH2 TRUCK. HAS TO GO TO SHOP. DISCUSS WITH PUSHER ABOUT I GETTING MORE TRUCKS OUT HERE. TRUCKING STARTING TO GET EVERYTHING GOING. CHANGE OUT PACKOFFS(100K) WHILE GETTING TRUCKS TAKEN CARE OF. I PERFORM LEAK TIGHT TEST ON MASTER AND SSV. FILL STACK, STAB INJECTOR. PRESSURE TEST PACKOFF. POP OFF. RE INSTALL NIGHT CAP FOR BULLHEAD KILL. 23:00 - 00:00 1.00 DRILL N WAIT PROD1 PJSM, DISCUSS FLUID MANAGEMENT WHILE PERFORMING OCN#10 LINE WELL UP TO CLOSED CHOKE. 0#. OPEN NEEDLE VALVE. WELL ON VACUUM. -PERFORM 30 MIN FLOW CHECK -COME ONLINE WITH 1%KCL. CAUGHT FLUID AT 49 BBLS -ESTABLISH STATIC LOSS PUMPING 4.14 BPM IN GETTING.53 BPM BACK GIVING A STATIC LOSS RATE OF 3.61 BPM(216 BPH) -SHUT CHOKE IN Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 19 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:OOAM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00 @74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/2/2015 00:00 - 02:30 2.50 DRILL N DPRB PROD1 !-BULLHEAD WELL KILL -INCREASE RATE TO 4.45 BPM @ 17 PSI WELLHEAD -170 BBLS AWAY 4.45 BPM @ 88 PSI WELLHEAD -191 BBLS AWAY 4.45 BPM @ 103 PSI WELLHEAD -211 BBLS AWAY 4.45 BPM @ 114 PSI WELLHEAD -228 BBLS AWAY 4.45 BPM @ 100 PSI • WELLHEAD •-STATIC LOSS RATE AT 3.32 BPM WITH 1% CLEAR KCL AT THIEF 02:30 - 03:00 0.50 DRILL N DPRB PROD1 PJSM. CALL ODE MAKE UP DRILLING BHA #10 PT QTS LOW/HIGH STATIC LOSS AFTER 1%VISCOSIFIED IN OPEN HOLE 2.0 BPM 03:00 - 04:45 1.75 DRILL N DPRB PROD1 RIH WITH BHA#10 04:45 - 06:00 1.25 • DRILL N DPRB PROD1 BHA ABOVE WINDOW AT 10600' CLOSE EDC -STATIC LOSS RATE=1.47 BPM •-DYNAMIC LOSS RATE=2.90 BPM PUMPING AT 2.87 BPM. JUST BARELY OVER 100%. •-LOG TIE IN+1.5 -BRING UP TO DRILLING RATE WITH PUMP 2. USING C-PUMP ON BACKSIDE. -RIH TO BOTTOM 06:00 - 06:30 0.50 DRILL P PROD1 DRILL LATERAL SECTION GET SPR'S FREE SPIN=2100 PSI AT 2.84 BPM ANNULAR BHP=3940# • RATE IN=2.85 BPM RATE OUT=0 BPM PUMPING ACROSS TOP MW IN=8.41 PPG MW OUT=8.40 PPG ECD •=8.66 PPG 100%+LOSSES MW TEMP IN=86.6 DEG MW TEMP OUT=85.5 DEG BHT=106 DEG ROP= FPH WOB= 2K CIRC PSI= 2322PSI IAP=0 PSI OAP=CEMENTED Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 200f 28 Operation Summary Report • Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:OOAM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00 @74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:30 - 09:00 2.50 DRILL P PROD1 CONTINUE DRILLING AHEAD FREE SPIN=2190 PSI AT 2.86 BPM RATE IN=2.83 BPM RATE OUT=1.29 BPM (HOLE FILL ACROSS THE TOP) 1 MW IN=8.44 PPG MW OUT=8.40 PPG ECD I=8.62 PPG ROP=100 FPH WOB=2.96 K CIRC PSI= 2227 PSI IAP=0 PSI OAP=CEMENTED PSI PVT= . i 180 BBLS HAVING Wt TRANSFER ISSUES,BACK IN THE MUD TRUCK TO PUMP SWEEPS AND ORDER OUT 4 DRUMS OF LOTORQ FOR LUBE PILLS 07:22 STOP FILLING PITS AND GET ANOTHER FLUID LOSS RATE IN RATE=2.85 BPM OUT RATE=1.26 BPM (CHARGE PUMP FLOWING ACROSS THE TOP) TOTCO PVT=192 BBLS CTDS PVT=191 BBLS 07:32 TOTCO PVT=163 BBLS CTDS PVT=163 BBLS ' LOSS RATE TOTCO PVT=174 BPH 2.90 BPM CTDS PVT=168 BPH OR 2.8 BPM T09:00 - 09:40 1 0.67 DRILL P PROD1 CONTINUE DRILLING AHEAD PUMP ANOTHER 10 BBL MUD PILL FREE SPIN=2190 PSI AT 2.86 BPM RATE IN=2.81 BPM RATE OUT=1.23 BPM (HOLE FILL ACROSS THE TOP) MW IN=8.43 PPG MW OUT=8.40 PPG ECD =8.61 PPG ROP=85 FPH WOB=1.5 K CIRC PSI= 2320 PSI IAP=0 PSI OAP=CEMENTED PSI PVT=178 BBLS MAKING SEVERAL BHA WIPERS 09:40 - 10:00 0.33 DRILL P PROD1 NOT MAKING ANY PROGRESS STACKING WEIGHT,PU TO 11715 110'ABOVE THE LOSS ZONE TO SEE IF WE HAVE A CUTTINGS BED NOTALLOWING US TO SLIDE I 10:00 - 10:35 0.58 DRILL P PROD1 BACK ON BOTTOM 10:35 - 11:30 0.92 DRILL P PROD1 NOT MAKING MUCH PROGRESS,TRY PUMPING A 20 BBL MUD PILL TO SEE IF IT HELPS GAMMA CHANGE AT 12,020'THEN WENT BACK TO A SAND,RES TOOL CHANGE AT 12,037'AND HASN'T COME BACK DOWN Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 21 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM [Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00 i74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:30 - 12:30 1.00 DRILL P PROD1 CONTINUE DRILLING AHEAD PUMP ANOTHER 10 BBL MUD PILL FREE SPIN=2190 PSI AT 2.86 BPM RATE IN=2.81 BPM RATE OUT=1.23 BPM (HOLE FILL ACROSS THE TOP) MW IN=8.43 PPG MW OUT=8.40 PPG ECD =8.61 PPG ROP=32 FPH WOB=2.78 K CIRC PSI= i 2084 PSI IAP=0 PSI OAP=CEMENTED PSI PVT=272 BBLS STILL MAKING SEVERAL BHA WIPERS 12:30 - 13:05 0.58 DRILL P PROD1 CONTINUE DRILLING AHEAD FREE SPIN=2190 PSI AT 2.86 BPM RATE IN=2.79 BPM RATE OUT=1.15 BPM (HOLE FILL ACROSS THE TOP) MW IN=8.40 PPG MW OUT=8.38 PPG ECD =8.61 PPG ROP=141 FPH WOB=1.48 K CIRC PSI= 2260 PSI IAP=0 PSI OAP=CEMENTED PSI PVT=260 BBLS 1305 - 14:20 1.25 DRILL P PROD1 STACKING WT,PU FOR 130'FORA BHA WIPER THEN CONTINUE DRILLING 14:20 - 15:35 1.25 DRILL P PROD1 CONTINUE DRILLING AHEAD FREE SPIN=2190 PSI AT 2.86 BPM RATE IN=2.74 BPM RATE OUT=1.31 BPM (HOLE FILL ACROSS THE TOP) MW IN=8.40 PPG MW OUT=8.37 PPG ECD I=8.58 PPG ROP=93 FPH WOB=2.17 K CIRC PSI= 2131 PSI IAP=0 PSI OAP=CEMENTED PSI PVT=276 BBLS 15:35 - 16:10 0.58 DRILL P PROD1 CONTINUE DRILLING AHEAD FREE SPIN=2190 PSI AT 2.86 BPM RATE IN=2.99 BPM RATE OUT=1.15 BPM (HOLE FILL ACROSS THE TOP) MW IN=8.42 PPG MW OUT=8.39 PPG ECD =8.65PPG •ROP=150 FPH WOB=3.19 K CIRC PSI= 2465 PSI IAP=0 PSI OAP=CEMENTED PSI PVT=281 BBLS 16:10 - 17:35 1.42 DRILL P PROD1 WIPER TO THE WINDOW MAD PASS LOG 11,750 TO 11,665 17:35 - 18:00 0.42 DRILL P PROD1 LOG TIE IN GAMMA VALUE IS LOW,POOH TO CHECK THE TOOLS 18:00 - 21:00 3.00 DRILL N DFAL PROD1 POOH. WEIGHTS HIGHER THAN NORMAL. OPEN EDC. CIRCULATE WHILE POOH _ AT SURFACE. SWAP TOOLS 21:00 - 22:00 1.00 DRILL N DFAL PROD1 PULLED BHA#9/PU BHA#10 22:00 - 00:00 2.00 DRILL N DFAL PROD1 RIH -TIE IN TO RA TAG-9 CORRECTION. 3/3/2015 00:00 - 03:00 3.00 DRILL N DFAL ! 12,350.00 PROD1 CONTINUE IN HOLE -PERFORM MAD PASS 12,000'-12350' Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 22 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:OOAM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00 @74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 04:00 1.00 DRILL P PROD1 CONTINUE DRILLING AHEAD FROM 12350-12400 FREE SPIN=2029 PSI AT 2.86 BPM IRATE IN=2.78 BPM RATE OUT=1.03 BPM (HOLE FILL ACROSS THE TOP) MW IN=8.40 PPG MW OUT=8.39 PPG ECD =8.66 PPG ROP= FPH WOB=1.3 K CIRC PSI=2172 PSI IAP=0 PSI OAP=CEMENTED PSI 04:00 - 06:00 2.00 DRILL P PROD1 CONTINUE DRILLING AHEAD FROM 12400' FREE SPIN=1956 PSI AT 2.74 BPM RATE IN=2.74 BPM RATE OUT=0.76 BPM (HOLE FILL ACROSS THE TOP) MW IN=8.40 PPG MW OUT=8.40 PPG ECD =8.78 PPG HAVING WEIGHT TRANSFER ISSUES CALL FOR SAFELUBE PULL TO WINDOW 06:00 - 06:45 0.75 DRILL P PROD1 AT WINDOW. SAFELUBE ARRIVE. CLOSED CHOKE. BULLHEAD VISCOSIFIED 1% KCL WITH SAFELUBE 12.63 BPM @ 293# ANNULAR 3843# 2.40 BPM @ 275# ANNULAR 3843# 06:45 - 06:55 0.17 DRILL P PROD1 HIGH VIS KCI W/SAFELUBE DISPLACED TO THE TT,RIH TO LOG TIE IN 06:55 - 07:45 0.83 DRILL P• PROD1 CORRECT DEPTH 6'AND RIH 07:45 - 09:00 1.25 DRILL P PROD1 BACK ON BOTTOM DRILLING FREE SPIN=2260 PSI AT 2.88 BPM RATE IN=2.88 BPM RATE OUT=1.32 BPM (HOLE FILL ACROSS THE TOP) MW IN=8.40 PPG MW OUT=8.39 PPG ECD =8.86 PPG 1 ROP=30 FPH WOB=2.32 K CIRC PSI= 2468 PSI IAP=0 PSI OAP=CEMENTED PSI PVT= 180 BBLS LOSS RATE=180 BPH OR 3.0 BPM 09:00 - 09:30 0.50 DRILL P PROD1 STACKING WT,TRY PUMPING ANOTHER MUD PILL 09:30 - 10:15 0.75 DRILL P PROD1 MUD PILL IS WORKING,LOOKS LIKE WE NEED MORE LUBES FOR FORMATION FRICTION FREE SPIN=2260 PSI AT 2.88 BPM RATE IN=2.88 BPM RATE OUT=1.32 BPM (HOLE FILL ACROSS THE TOP) MW IN=8.40 PPG MW OUT=8.39 PPG ECD =8.86 PPG ROP=90 FPH WOB=1.51 K CIRC PSI= 2359 PSI IAP=0 PSI OAP=CEMENTED PSI PVT= 196 BBLS LOSS RATE=180 BPH OR 3.0 BPM Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 23 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00 @74.94usft(above Mean Sea Level) -- Date I From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:15 - 10:45 0.50 DRILL P PROD1 MUD PILL IS WORKING FREE SPIN=2260 PSI AT 2.88 BPM RATE IN=2.97 BPM RATE OUT=1.35 BPM (HOLE FILL ACROSS THE TOP) MW IN=8.40 PPG MW OUT=8.39 PPG ECD =8.86 PPG ROP=136 FPH WOB=1.07 K CIRC PSI= 2417 PSI IAP=0 PSI OAP=CEMENTED PSI PVT= 187 BBLS LOSS RATE=180 BPH OR 3.0 BPM 10:45 - 11:10 0.42 DRILL P PROD1 CONTINUE DRILLING AHEAD FREE SPIN=2260 PSI AT 2.88 BPM RATE IN=2.95 BPM RATE OUT=1.35 BPM (HOLE FILL ACROSS THE TOP) MW IN=8.40 PPG MW OUT=8.37 PPG ECD =8.75 PPG ROP=112 FPH WOB=1.07 K CIRC PSI= 2260 PSI IAP=0 PSI OAP=CEMENTED PSI PVT= 184 BBLS LOSS RATE=180 BPH OR 3.0 BPM 11:10 - 12:00 0.83 DRILL P PROD1 LOOSING TRACTION AGAIN,PUMP A 75 BBL LOTORQ PILL DOWN TO SEE IF IT HELPS OR GO BACK TO MUD PILLS SEVERAL BHA i WIPERS HAVE NOT HELPED 12:00 - 13:00 1.00 DRILL P PROD1 CONTINUE DRILLING AHEAD,LOTORQ PILL DID NOT HAVE MUCH AFFECT ON WEIGHT TRANSFER.PUMPA MUD PILL FREE SPIN=2260 PSI AT 2.88 BPM RATE IN=2.83 BPM RATE OUT=1.35 BPM (HOLE FILL ACROSS THE TOP) MW IN=8.51 PPG MW OUT=8.42 PPG ECD =8.76 PPG ROP=75 FPH WOB=1.21 K CIRC PSI= 1996 PSI IAP=0 PSI OAP=CEMENTED PSI PVT= 218 BBLS LOSS RATE=180 BPH OR 3.0 BPM DRILLING MUD IS WORKING 13:00 - 13:50 0.83 DRILL P PROD1 CONTINUE DRILLING AHEAD FREE SPIN=2260 PSI AT 2.88 BPM RATE IN=2.90 BPM RATE OUT=1.36 BPM (HOLE FILL ACROSS THE TOP) MW IN=8.40 PPG MW OUT=8.37 PPG ECD =8.76 PPG ROP=75 FPH WOB=2.10 K CIRC PSI= 2292 PSI IAP=0 PSI OAP=CEMENTED PSI PVT= 223 BBLS LOSS RATE=180 BPH OR 3.0 BPM HAVING TO DO FREQUENT PU'S,PUMP ANOTTHER 30 BBL MUD PILL Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 24 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00 @74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:50 - 14:35 0.75 DRILL P PROD1 CONTINUE DRILLING AHEAD FREE SPIN=2260 PSI AT 2.88 BPM RATE IN=2.92 BPM RATE OUT=1.35 BPM (HOLE FILL ACROSS THE TOP) MW IN=8.54 PPG MW OUT=8.40 PPG ECD =8.76 PPG ROP=150FPH WOB=0.84K CIRC PSI= i2197PSI IAP=0 PSI OAP=CEMENTED PSI PVT= 204 BBLS LOSS RATE=180 BPH OR 3.0 BPM 14:35 - 15:30 0.92 DRILL P PROD1 CONTINUE DRILLING AHEAD FREE SPIN=2260 PSI AT 2.88 BPM RATE IN=2.89 BPM RATE OUT=1.37 BPM (HOLE FILL ACROSS THE TOP) MW IN=8.39 PPG MW OUT=8.37 PPG ECD =8.77 PPG ROP=30 FPH WOB=1.2 K CIRC PSI= 2389 PSI IAP=0 PSI OAP=CEMENTED PSI PVT= 207 BBLS LOSS RATE=180 BPH OR 3.0 BPM NO CHANGE IN LOSSES SINCE WE STARTED DRILLING 15:30 - 16:10 0.67 DRILL P PROD1 SLOW PROGRESS PUMP A 60 BBL MUD PILL ABLE TO GET WOB WITH MUD BUT NOT MAKING MUCH PROGRESS 16:10 - 17:10 1.00 DRILL P PROD1 ABLE TO GET SOME WOB BUT NOT MAKING MUCH HOLE LIKE ITS BALLED UP DRILLED 423'WIPE TO THE WINDOW TIE IN THEN TRY DRILLING AGAIN BHCT ON BOTTOM=126° CHECK THE BHCT ABOVE THE THIEF ZONE 11750 BHCT=118°(75'ABOVE THE THIEF ZONE) Prnted 3/16/2015 1:28:22PM North America-ALASKA-BP Page 25 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date 3/4/2015 X3-016NN-C•(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12.00.00AM Rig Release:3/10/2015 Rig Contractor NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00(i74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) 17:10 - 17:50 0.67 DRILL N MISC PROD1 PULL INTO THE CASING,CTS NEEDS TO REPLACE A RETAINER PIN ON THE CHAINS WHICH WILL REQUIRE A LOTO AND EMRC HOLD PJSM TO PERFORM THE WORK SET THE INJECTOR&REEL BRAKES,SHUT DOWN AND LOTO THE POWER PACK CLOSE THE UPPER SET OF COMBI RAMS THE BRING THE KOOMEY TO HIGHSIDE t RUN IN THE MANUAL LOCKS AND PERFORM A PUSH PULL TEST 5K OVER UP WT(50K)AND , 5K PAST NEUTRAL REMOVE THE CHAIN GAURD AND INSTALL THE NEW PIN PAINT A MARK ON THE PIPE FOR DEPTH REFERENCE TO INSPECT WHERE RAMS CLOSED PIN REPLACED,INSTALL THE CHAIN GAURD REMOVE THE LOTO AND STARTUP THE POWER PACK RELEASE THE BRAKES AND PU TO HANG WT (50K) BACK OUT THE MANUAL LOCKS AND OPEN -THE UPPER SET OF COMBI'S POOH TO INSPECT THE COIL IN THE REEL HOUSE SLIP MARKS LOOK GOOD RIH TO CONTINUE OPS TO TIE IN 17:50 - 18:00 0.17 DRILL P PROD1 LOG TIE IN 18:00 - 20:45 2.75 DRILL P PROD1 CORRECT DEPTH+8',RIH AND CONTINUE DRILLING 20:45 - 23:45 3.00 DRILL P PROD1 DECREASING ROP AND LITTLE TO NO WEIGHT TRANSFER AFTER SEVERAL WIPER ATTEMPTS;HOLD PJSM AND POH FOR AGITATOR 23:45 - 00:00 0.25 DRILL P PROD1 HOLD PJSM FOR HANDLING BHA 3/4/2015 00:00 - 00:30 0.50 DRILL P PROD1 INSPECT FINAL-50'COIL(5TH RUN IN CHROME AND SHOWING SIGNS OF WEAR) LAY DOWN BHA;GRADE BIT 1-1 00:30 - 00:45 0.25 DRILL P I PROD1 t FUNCTION TEST BOP FROM RIG FLOOR 00:45 - 01:30 0.75 DRILL P PROD1 RIG UP HYDRAULIC CUTTER AND CUT 100' COIL AND E-LINE 01:30 - 03:00 1.50 DRILL P PROD1 HAND-CUT AND GRIND FINAL CUT MAKE UP COIL CONNECTOR AND PULL TEST TO 35K HEAD UP BAKER UPPER QUICK CONNECT TO COIL CONNECTOR TEST E-LINE AND PRESSURE TEST COIL CONNECTOR/UPPER QUICK TO 3500 PSI 03:00 - 03:30 0.50 DRILL P PROD1 HOLD PJSM AND MAKE UP LATERAL BHA i WITH DRILLING AGITATOR(BHA#11) 03:30 - 03:45 0.25 DRILL P PROD1 STAB ON INJECTOR AND PRESSURE TEST QTS TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES 03:45 - 06:00 2.25 DRILL P PROD1 FILL PITS AND RIH WITH LATERAL BHAAND AGITATOR STOP AT 500'AND TEST AGITATOR CONTINUE RIH AT 100 FPM WITH LATERAL BHA Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 26 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:OOAM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UW:500292046700 Active datum:12:10 7/6/1980 00:00©74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 06:20 ' 0.33 DRILL P PROD1 CLOSE EDC AND TIE-IN 06:20 - 07:25 1.08 DRILL P PROD1 CORRECT DEPTH-9.5'AND RIH 07:25 - 08:30 1.08 DRILL P PROD1 BACK ON BOTTOM DRILLING WITH GOOD WT TRANSFER FREE SPIN=3274 PSI AT 2.78 BPM RATE IN=2.79 BPM RATE OUT=1.30 BPM (HOLE FILL ACROSS THE TOP) MW IN=8.41 PPG MW OUT=8.37 PPG ECD =8.91 PPG ROP=30 FPH WOB=4.99 K CIRC PSI= 3508 PSI IAP=0 PSI OAP=CEMENTED PSI PVT= 233 BBLS LOSS RATE=180 BPH OR 3.0 BPM AGITATOR IS WORKING STRONG VERY HARD DRILLING SLOW ROP,ABLE TO GET GOOD WT TRANSFER&WOB AND MOTOR WORK 08:30 - 09:30 1.00 DRILL P PROD1 STALL PU AND PULLING HEAVY-70 THEN PULLED TO 90K TRY WORKING UP AND DOWN AND WE ARE SHOWING-10k LESS RIH WT FROM 18-19K DOWN TO 7-8K RIH AND TAG AT 12795,NO WOB SOMETHING IS ABOVE THE WOB SUB,PU AND PULLED HEAVY THEN CLEANED UP A LITTLE RIH AND TAGGED AGAIN,PULL HEAVY-75K PU TO TRY AND CLEAN UP WHAT MIGHT BE ABOVE OR BESIDE US 09:30 - 09:45 0.25 DRILL P PROD1 PULLING HEAVY AT 11900'NO WOB,WE ARE DRAGGING SOMETHING UP HOLE OR WHAT WE DRILLED THROUGH AT 12800 MIGHT BE FALLING APART AND LARGE CHUNKS OF FORMATION ARE PACKING OFF AT THE THIEF ZONE ABOVE WORKED UP TO 11885 AND CLEANED UP WATCH FOR IT AT 11800 WHEN THE BIT PASSES BY REDUCE POOH SPEED AS TO NOT PULL THE BIT INTO IT AND GET BIT STUCK LOOKS CLEAN MIGHT HAVE DROPPED IT OF AT THE THIEF ZONE AT 11825,PU TO 11700 THEN RIH TO TRY DRILLING AGAIN 109:45 - 10:20 0.58 DRILL P PROD1 RIH CLEAN PASSING BY 11825 12060'RIH Wr IS GETTING A LITTLE RATTY SHALE AT 12040 MIGHT BE TALIKING TO US, RIH WT CLEANED UP AT 12120'WHICH IS THE BHA LENGTH TO GET PAST THE 12040 SHALE RIH WT IF FAIRLY CLEAN AT 17-18K REDUCTION IN RIH WT AT 12795'SHALE KEEP AN EYE ON ECD FOR PACKING OFF,IF SHALE AT 12795 ISA RUBBLE ZONE THE AGITATOR COULD ALLOW CHUCKS OF FORAMTION TO FALL ON TOP OF US Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 27 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00 @74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:20 - 10:45 0.42 DRILL P PROD1 BACK ON BOTTOM DRILLING WITH GOOD WT TRANSFER FREE SPIN=3274 PSI AT 2.78 BPM RATE IN=2.80 BPM RATE OUT=1.24 BPM (HOLE FILL ACROSS THE TOP) MW IN=8.43 PPG MW OUT=8.36 PPG ECD =8.88 PPG ROP=90 FPH WOB=2.95 K CIRC PSI= 3446 PSI IAP=0 PSI OAP=CEMENTED PSI PVT= 285 BBLS LOSS RATE=180 BPH OR 3.0 BPM 110:45 - 12:00 1.25 DRILL P PROD1 I BACK ON BOTTOM DRILLING WITH GOOD WT TRANSFER 'FREE SPIN=3274 PSI AT 2.78 BPM RATE IN=2.91 BPM RATE OUT=1.25 BPM (HOLE FILL ACROSS THE TOP) MW IN=8.44 PPG MW OUT=8.36 PPG ECD =8.87 PPG ROP=132 FPH WOB=3.32 K CIRC PSI= 3534 PSI IAP=0 PSI OAP=CEMENTED PSI PVT= 288 BBLS LOSS RATE=180 BPH OR 3.0 BPM 12:00 - 12:15 0.25 DRILL P PROD1 BACK ON BOTTOM DRILLING WITH GOOD WT TRANSFER FREE SPIN=3274 PSI AT 2.78 BPM RATE IN=2.82 BPM RATE OUT=1.19 BPM (HOLE FILL ACROSS THE TOP) MW IN=8.43 PPG MW OUT=8.35 PPG ECD =8.86 PPG 'ROP=133 FPH WOB=2.37 K CIRC PSI= 3527 PSI IAP=0 PSI OAP=CEMENTED PSI PVT= 286 BBLS LOSS RATE=180 BPH OR 3.0 BPM 12:15 - 13:00 0.75 DRILL P PROD1 STACKING WT,PU AND RIH AND STACKING OUT ABOVE TD,PUH 200'AND RIH AND STACKED OUT,CONTINUE POOH TO 11750 THEN TRY TO RIH RIH FROM 12750 AND TAGGED AT 12795', MADE A FEW ATTEMPTS TO GO DOWN AND KEEP TAGGING WITH SLIGHT OVER PULLS. PULL TO 11700' 13:00 13:30 0.50 DRILL P PROD1 PULLED UP TO 11700 WITH A COUPLE OVER PULLS AT 11900,RIH AND NOT SEEING ANY DRAG,RIH CLEAN.LOOKS LIKE WHATEVER WE ARE DRAGGING UP WE ARE ABLE TO DROP IT OFF AT THE THIEF ZONE AT 11825 AND RIH CLEAN Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 28 of 28 Operation Summary Report Common Well Name:X-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:2/20/2015 End Date:3/4/2015 X3-016NN-C:(4,037,839.00) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM I Rig Release:3/10/2015 Rig Contractor NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00©74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:30 - 14:30 1.00 DRILL P PROD1 12750 REDUCE RATE TO RUN THOUGH SHALE AT 12795 TAG AT 12795 WITH MINIMAL WOB,PU TAG AGAIN BRING THE PUMP UP 2.0 BPM AND MADE IT THROUGH MADE IT DOWN TO 12854 THEN STACKED OUT AND CAN'T GO DOWN PU WITH A 5 K OVER PULL,KEEP COMING UP TO 12750 REDUCE THE RATE TO 1.20 BPM AND TRY RUNNING DOWN AGAIN NO GO,PU TO 12550'AND RIH STACK OUT AGAIN,BRING PUMP UP TO RATE AND WERE ABLE TO GET DOWN AGAIN BUT STACKING OUT WITH NO WOB STOP AT 12860 AND PULL BACK THROUGH ,SHALE RIH AND TRY AGAIN,TAG AT 12795,WE ARE ABLE TO FORCE ARE WAY DOWN BUT ITS TAKING ALL OUR SURFACE WT TO DO IT MADE IT DOWN TO 12896 14:30 - 16:001.50 DRILL P PROD1 CALL TON AND DISCUSS WELL I W CONDITIONS 16:00 - 16:20 0.33 DRILL P PROD1 'TD CALLED,WIPE TO THE WINDOW AND TIE • IN 16:20 - 16:40 0.33 DRILL P PROD1 LOG TIE IN 16:40 - 18:30 1.83 DRILL P PROD1 PUH AND RELOG THE CCL HIGH AT 9400'FOR POSSIBLE HIGHER LINER TOP PLACEMENT 18:30 - 19:45 1.25 DRILL P PROD1 RIH TO 12795'AND PUMP LINER RUNNING PILL - 23:00 19:45 _ I 3.25 DRILL P PROD1 !POH,LAYING IN 35 BBLS LINER RUNNING PILL WITH 1.5 PPB ALPINE BEADS STOP AND PAINT END OF PIPE FLAGS AT 9400'AND 7200' I WELL TOOK-200 BBLS OVER TRIP DECISION MADE NOT TO RUN CHROME LINER(SEE OCN#11) -LAY DOWN AND LOAD OUT 2-7/8",3-1/4", 3-1/2"13CR-85 LINER FROM PIPE SHED TO GROUND WHILE TRIPPING 23:00 - 00:00 1.00 DRILL P PROD1 LAY DOWN LATERAL BHA -HOLD PJSM WITH NORDIC, SCHLUMBERGER AND BAKER -TAG UP,POP OFF INJECTOR -LAY DOWN BHA,BLOW DOWN MOTOR AND INSPECT BIT(1-1)AND SLIGHTLY BALLED Printed 3/16/2015 1:28:22PM North America-ALASKA-BP Page 1 of 11 Operation Summary Report Common Well Name:X-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/5/2015 End Date:3/10/2015 X3-016NN-C:(1,196,448.03) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:OOAM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00 @74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/5/2015 00:00 - 01:30 1.50 CASING P RUNPRD MANAGE E-LINE SLACK -BOOT E-LINE AND PUMP SLACK FORWARD; RECOVER AND CUT 205 E-LINE DECISION MADE NOT TO RUN CHROME LINER(SEE OCN#11) -LOAD 2-7/8",3-1/4",3-1/2"L-80 LINER INTO PIPE SHED WHILE MANAGING E-LINE SLACK 01:30 - 02:30 1.00 CASING P RUNPRD HEAD UP BAKER THROUGH TUBING 1-CUT DIMPLE CONNECTOR,RE-BOOT ELINE, GRIND COIL AND MAKE UP BAKER EXTERNAL SLIP CONNECTOR -PULL TEST TO 35K AND PRESSURE TEST TO 3500 PSI DECISION MADE NOT TO RUN CHROME LINER(SEE OCN#11) CONTINUE LOADING 2-7/8",3-1/4",3-1/2"L-80 LINER INTO PIPE SHED WHILE HEADING UP BAKER THROUGH TUBING 02:30 - 11:00 8.50 CASING N WAIT 13,032.00 RUNPRD DECISION MADE NOT TO RUN CHROME LINER(SEE OCN#11) 1-CONTINUE LOADING 2-7/8",3-1/4",3-1/2"L-80 LINER INTO PIPE SHED -THAWAND REMOVE THREAD PROTECTORS -DRIFT,STRAP AND TALLY L-80 TUBULARS -ENTER TALLIES IN OPEN WELLS AND EXEL SPREAD SHEET -ORDERS RECEIVED TO CHANGE THE GUIDE SHOE TO A 2-2/8"POWER SHOE -MEASURE AND CALIPER NEW SHOE. ADJUST TALLY IN OPEN WELLS AND EXEL -CONFIRM TOOLS AND LINER COUNT IN PIPE SHED -STATIC LOSSES TO THE WELL 74 BPH 11:00 - 11:30 0.50 CASING P RUNPRD PJSM WITH CREWAND THIRD PARTY CONTRACTORS -CONFIRM HOLE FILL METHOD -VERIFY SAFETY JOINTS AND CROSS OVERS 11:30 - 18:15 6.75 CASING P RUNPRD RUN PRODUCTION LINER -MAKE UP POWER SHOE AND CROSS OVER -MAKE UP 2-7/8"LINER.DRIFT FIRST 5 JOINTS RAN -RUN 53 JOINTS 2-7/8"6.5#L-80 STL -RUN 29 JOINTS 3-1/4"6.6#L-80 STL -RUN 10 JOINTS 3-1/2"9.3#L-80 STL 18:15 - 19:00 0.75 CASING P RUNPRD KICK WHILE TRIPPING DRILL AND CREW CHANGE -GOOD CREW RESPONSE;OFF-GOING CREW REPORTED TO STATIONS DURING HANDOVER -CREW CHANGE;DISCUSSED FLUID MANAGEMENT DUE TO HIGH LOSSES -CONDUCT WALK AROUND Printed 3/16/2015 1:28:54PM North America-ALASKA-BP Page 2 of 11 Operation Summary Report Common Wet Name:X-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/5/2015 End Date:3/10/2015 X3-016NN-C:(1,196.448.03) Project:Prudhoe Bay j Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA WWI:500292046700 Active datum:12:10 7/8/1980 00:00©74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT % NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 20:45 1.75 I CASING P RUNPRD j RUN PRODUCTION LINER ;-RUN 6 JOINTS 3-1/2"9.3#L-80 STL LINER -CONFIRM HOLE AND LINER FULL -PICK UP LINER RUNNING TOOL AND X NIPPLE -PICK UP 6 JOINTS OF 2-3/8"PH6 DRILL PIPE 20:45 - 21:30 0.75 CASING P RUNPRD i STAB ON INJECTOR AND PRESSURE TEST QTS TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES FILL PITS AND FINALIZE FLUID SUPPORT OPTIONS FOR UPCOMING TRIP AND CEMENT JOB 21:30 - 00:00 2.50 CASING P RUNPRD RIH WITH PRODUCTION LINER -RIH AT 100 FPM,CIRCULATING MINIMUM RATE THROUGH COIL,MAINTAINING HOLE FILL ACROSS THE TOP -LOSS RATE—120 BPH WHILE TRIPPING j-TIE-INTO EOP WINDOW FLAG AND CORRECT(-20) -CONTINUE RIH AT 40 FPM(OH)AND TAG TD AT 13030';PU,CONFIRM TD AND STACK 13K DOWN 3/6/2015 00:00 - 02:00 2.00 CASING P RUNPRD RELEASE FROM LINER -PICK UP WEIGHT 68K OFF BOTTOM -PERFORM SCHLUMBERGER BALL DROP PROCEDURE AND RELEASE FROM LINER;45 BBLS DISPLACED,SHEAR AT 2740 PSI -CONFIRM WITH 46K PICK UP WEIGHT -FILL PITS WITH SLICK 1%KCL AND DISPLACE WELL WHILE RIGGING UP SCHLUMBERGER CEMENTERS 02:00 - 02:30 0.50 CEMT P RUNPRD RIG UP CEMENTERS -CONTINUE RIGGING UP CEMENTERS WHILE _ DISPLACING WITH SLICK 1%KCL 02:30 - 03:45 1.25 CEMT P RUNPRD PRESSURE TEST CEMENT LINES TO NORDIC STANDPIPE -HOLD PJSM WITH NORDIC,CTD AND SCHLUMBERGER AND DISCUSS PRESSURE CROSSCHECK CARD • -PRESSURE TEST HARDLINES TO 5000 PSI 03:45 - 05:30 1.75 CEMT N WAIT 13,032.00 RUNPRD I WAIT ON CH2M HILL TO RETURN WITH CONTAM PILL PRIOR TO BEGGINING CEMENT JOB 05:30 - 06:00 0.50 CEMT P RUNPRD SPOT,RIG UP CONTAM TRUCK AND WAIT ON CREW CHANGE PRIOR TO BEGINNING •CEMENT JOB 06:00 - 07:00 1.00 CEMT P RUNPRD ALLOWALL CREWS TO CHANGE OUT 07:00 - 07:30 0.50 CEMT • P RUNPRD HOLD PJSM TO PUMP CMT Printed 3/16/2015 1:28:54PM North America-ALASKA-BP Page 3 of 11 Operation Summary Report Common Well Name:X-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/5/2015 End Date:3/10/2015 X3-016NN-C:(1,196,448.03) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM Rig Release:3/10/2015 Rig Contractor.NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00©74.94usft(above Mean Sea Level) Date From-To Hrs Task Code I NPT NPT Depth Phase Description of Operations (hr) (usft) 07:30 - 10:20 2.83 CEMT N MISC RUNPRD VAC TRUCK IS SEND 5 BBLS OF EXHAUST PILL TO THE CMT VAN THEN FILL PITS 2&3 THEN WE WILL BE READY TO BATCH CMT VAC TRUCK HAVING PROBLEMS BUILDING PRESSURE TO MOVE FLUIDS TO THE CMT VAN AND PITS CALL CH2 DISPATCH TO SEE IF WE CAN GET ANOTHER TRUCK NO TRUCKS AVAILABLE LOAD PITS WITH KCL TO EMPTY A TRUCK THEN USE THAT TRUCK TO SUCK OUT THE EXHAUST PILL FROM THE DEAD TRUCK SHUT DOWN PUMP TO LOAD KCL INTO OUR ACTIVE PIT,PIT 1. 10:20 - 10:35 0.25 CEMT P RUNPRD HOLD PJSM TO GO OVER THE JOB STEPS AGAIN JUST TO MAKE SURE WERE ALL ON THE SAME PAGE BEFORE WE GET STARTED AGAIN Printed 3/16/2015 1:28:54PM North America-ALASKA-BP Page 4 of 11 Operation Summary Report Common Well Name:X-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/5/2015 End Date:3/10/2015 X3-016NN-C:(1,196,448.03) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12.00:OOAM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00 @74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft)__ 10:35 - 12:50 2.25 CEMT P RUNPRD START CMT JOB 10:41 BATCH UP CMT 11:05 421 PSI @ 1.5 BPM 11:12 CMT TO WEIGHT 5:30 MIN THICKENING TIME(16:42) 11:22 SWAP COIL PUMP TO EXHAUST PILL 11:18 SHUT DOWN RIG PUMP AND LINE UP CMT PUMP DOWN THE COIL WITH THE CMT PUMP,RIG PUMP CIRCULATING ACROSS THE TOP TO KEEP THE HOLE FULL STILL LOOSING-100 BPH 11:20 ON LINE WITH CMT PUMP WITH 5 BBLS OF KCL AHEAD 11:25 ON LINE WITH CMT,ZERO IN MM AT 13.5 PPG DENSITY IN RATE=2.45 BPM OUT RATE =1.51 BPM 0.94 BPM OR 57 BPH 11:45 44.5 BBLS CMT AWAY+5 BBLS BBLS EXHAUST PILL,SHUT DOWN CMT PUMP 111:46 ONLINE WITH RIG PUMP TO DISPLACE CMT WITH EXHAUST PILL 11:48 56.2 BBLS AWAY REDUCE RATE TO 1.5 BPM AS TO NOT SLAM SELRT WITH CMT 11:50 INCREASE RATE TO 2.0 BPM TO KEEP UP WITH CMT 11:59 79.2 BBLS AWAY CMT AT THE SHOE, ZERO OUT MM AND TAKE RETURNS TO PIT#2 12:02 OUT RATE INCREASED FROM 1.40 TO 1.60 THEN STABILIZED 12:03 90.69 BBLS THE CMT IS AT THE TZ,OUT RATE INCREASED TO 1.75 AND CLIMBING BUT LEVELED OFF AT 1.79 12:06 SHUT IN KILL LINE VALVE TO CHECK FOR LOSSES,RETURN RATE =0.82 BPM SOWLY DROPPING OFF 12:07 100.2 BBLS AWAY,SHUT DOWN THE PUMP TO LAUNCH PEE WEE DART AND SIDE EXHAUST 12:08 PU TO UP WT+13' 12:10 STOP AT 13011',RIH SET BACK DOWN PUMP PEE WEE DART ON SEAT 12:12 PEE WEE DART ON SEAT (IN MM AT 100.2 BBLS OUT MM AT 101.5 BBLS) 12:13 PU TO PRESSURE DROP ON COIL AND SIDE EXHAUST 2.5 BBLS OF CMT AND 3 BBLS OF EXHAUST PILL 1.5 BPM=996 PSI 12:16 5.5 BBLS PUMPED,OPEN BAKER CHOKE AND SET WT BACK DOWN 12:18 ZERO IN MM AND PRESSURE UP TO SHEAR LWP 12:19 LWP SHEARED AT 3750 PSI,DISPLACE LWP AT 2.5 BPM IN RATE =2.37 BPM OUT RATE=1.77 12:28 PLUG BUMPED AT RATE AT 21.2 BBLS, PRESSURE UP FROM 2200 PSI TO 3200 PSI THEN SHUT DOWN THE PUMP 12:30 PRESSURE HOLDING,BLEED OFF COIL PRESSURE TO CHECK FLOATS 12:35 GOOD NO FLOW ON THE FLOATS, Printed 3/16/2015 1:28:54PM North America-ALASKA-BP Page 5 of 11 Operation Summary Report Common Well Name X-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/5/2015 End Date:3/10/2015 X3-016NN-C:(1,196,448.03) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM J Rig Release:3/10/2015 Rig Contractor.NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00©74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) CLOSE THE BAKER CHOKE AND PRESSURE UP TO 1500 PSI 12:36 PU TO PRESSURE DROP AND PUMP 5 BBLS OF EXHAUST PILL AT 0.5 BPM I ON LINE AT 0.46 BPM DOWN THE COIL, RETURN RATE=0.20 12:50 - 14:40 1.83 CEMT P RUNPRD PUMPED 5 BBLS ON TOP OF THE DEPLOYMENT SLEEVE AT 0.5 BPM,POOH AT 1.1 BPM WHILE FILLING THE HOLE ACROSS THE TOP 14:40 - 14:50 0.17 CEMT P RUNPRD OOH,SHUT DOWN THE PUMP TO ESTABLISH A STATIC LOSS RATE 14:50 - 15:00 0.17 CEMT P RUNPRD LOOSING 24 BPH 'HOLD PJSM TO LD THE LINER RUNNING BHA 15:00 - 16:00 1.00 CEMT P RUNPRD TAG UP,REMOVE THE INJECTOR AND PULL THE BHA WHILE KEEPING THE HOLE FULL ACROSS THE TOP 16:00 - 16:15 0.25 CEMT P JRUNPRD j BHA OOH AND LOADED OUT TOOL SHIFTED PROPERLY AND 5/8"BALL RECOVERED HOLD PJSM TO LOTO THE KOOMEY,LTT THE MASTER&SWAB AND OPEN THE BOPS TO -SWAP RAMS 16:15 - 16:45 0.50 BOPSUR P RUNPRD SHUT IN THE WELL AND LTT THE MASTER& SWAB 16:45 - 19:15 2.50 BOPSUR P RUNPRD CHANGE OUT 2-3/8"X 3-1/2"VBR RAMS FOR j 1.25"CSH RAMS GREASE MUD CROSS,BOP AND CHOKE VALVES PICK UP 2-3/8"TEST JOINT AND FLUID PACK BOP CREW CHANGE AND WALKAROUNDS;PJSM/ PRESSURE CROSSCHECK FOR HIGH-PRESSURE TESTING AOGCC REPRESENTATIVE MATT HERRERA REQUESTS NOTIFICATION ONCE SHELL TEST I COMPLETE 19:15 - 19:45 0.50 BOPSUR P j RUNPRD SHELL TEST BOP TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES NOTIFICY AOGCC OF GOOD SHELL TEST; MATT HERRERAALLOWS TESTING TO PROCEED WHILE HE MOBILIZES TO _ LOCATION FOR WITNESS 19:45 - 00:00 4.25 BOPSUR P RUNPRD PRESSURE TEST BOP TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES AOGCC REPRESENTATIVE MATT HERRERA WITNESSING TEST TEST H2S AND METHANE ALARMS 3/7/2015 00:00 - 01:30 1.50 BOPSUR P RUNPRD I PRESSURE TEST BOP TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES i AOGCC REPRESENTATIVE MATT HERRERA WITNESSING TEST 01:30 - 02:00 0.50 BOPSUR P ' RUNPRD PICKUP AND STAB ON INJECTOR;TEST I INNER REEL VALVE AND PACK-OFF TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES Printed 3/16/2015 1:28.54PM North America-ALASKA-BP Page 6 of 11 Operation Summary Report Common Well Name:X-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/5/2015 End Date:3/10/2015 X3-016NN-C:(1,196.448.03) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/me:7/6/1980 12:00:00AM Rig Release:3/10/2015 Rig Contractor.NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00 @74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:00 - 03:00 1.00 BOPSUR P RUNPRD OPEN WELL -INSTALL NIGHT CAP AND PRESSURE TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES -OPEN WELL;NO PRESSURE,NO FLOW -FILL WELL;WELL TOOK 16 BBLS -LOSS RATE 30 BPH 03:00 - 03:45 0.75 EVAL P RUNPRD HOLD PJSM WITH NORDIC,CTD AND SCHLUMBERGER LOGGER MOBILIZE LOGGING TOOLS TO RIG FLOOR 03:45 - 06:00 ' 2.25 I EVAL P RUNPRD 1MU CLEANOUT/LOGGING BHA -VERIFY 1.25"CSH TALLY IN PIPE SHED WITH NORDIC DRILLER AND SCHLUMBERGER LOGGER -MU LOGGING TOOLS AND 51 STANDS 1.25" CSH 06:00 - 06:40 0.67 EVAL P RUNPRD CREW CHANGE 06:40 - 07:00 0.33 EVAL P RUNPRD PJSM TO CONTINUE RUNNING CSH - 07:00 - 08:40 1.67 EVAL P RUNPRD VERIFY PIPE COUNT,THREAD PROTECTORS AND VERIFY TOTAL JT COUNT,THEN COMPARE WITH WHAT IS SUPPOSED TO BE INSIDE AND OUTSIDE tRU THE HEAD PIN AND CIRCULATE THE 33 JOINTS IN THE HOLE TO ENSURE ITS CLEAR OF SCALE 08:40 - 10:20 1.67 EVAL P RUNPRD CONTINUE RUNNING PIPE THEN CIRCULATE AGAIN AT JT 66 10:20 - 10:40 0.33 EVAL P RUNPRD 66 JTS RAN,RU THE HEAD PIN AND CIRCULATE 10:40 - 12:15 1.58 EVAL P RUNPRD CONTINUE RUNNING CSH 12:15 - 12:45 0.50 EVAL P RUNPRD ;BHA RAN,PU THE INJJECTOR,MU TO THE BHA AND PT THE QTS 12:45 - 13:55 1.17 EVAL P RUNPRD GOOD PT,RIH WITH LOGGING CLEAN OUT BHAAT MIN RATE 13:55 - 15:05 1.17 EVAL P RUNPRD 9400'INCREASE RATE TO MAX RATE 15:05 - 15:50 0.75 EVAL P RUNPRD TAG AT 13007 UNCORRECTED START PERF PILL DOWN HOLE 15:50 - 17:00 1.17 EVAL P RUNPRD 2 BBLS OF PERF PILL OUT,TAG AND POOH LOGGING UP AT 60 FPM 17:00 - 18:30 1.50 EVAL P RUNPRD STOP AT 9109.23'AND PAINTAFLAGFOR 5800'EOP THEN POOH 18:30 - 19:00 0.50 EVAL P RUNPRD HOLD PJSM FOR RACKING BACK 1.25"CSH AND LAYING DOWN REMAINING BHA 19:00 - 21:45 2.75 EVAL P RUNPRD LAY DOWN LOGGING/CLEANOUT BHA -POP OFF AND PULL BACK INJECTOR;LAY DOWN UPPER BHA -RACK BACK 51 STANDS 1.25"CSH -LAY DOWN LOGGING TOOLS;DOWNLOAD AND INTERPRET DATA;PBTD=12,995' 21:45 - 22:45 1.00 DHB P RUNPRD HOLD PJSM FOR SLACK MANAGEMENT, CUTTING COIL,AND REHEADING LINE PRIOR TO RUNNING LINER TOP PACKER RIG DOWN ELEVATORS AND RIG UP SLING; PICK UP INJECTOR CUT COIL TUBING CONNECTOR,CUT AND BOOT E-LINE _ 22:45 - 23:15 0.50 DHB P RUNPRD STAB ON INJECTOR AND PUMP SLACK BACK Printed 3/16/2015 1:28:54PM North America-ALASKA-BP Page 7 of 11 Operation Summary Report Common Well Name:X-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/5/2015 End Date 3/10/2015 ,X3-016NN-C:(1,196,448.03) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00©74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT l NPT Depth Phase Description of Operations (hr) (usft) 23:15 - 00:00 0.75 DHB P RUNPRD COIL MANAGEMENT -POP OFF INJECTOR AND RIG UP HYDRAULIC CUTTER -CUT 300'COIL AND RIG DOWN CUTTER;NO VISIBLE E-LINE -HAND-CUT FINAL 3/8/2015 00:00 - 00:45 0.75 DHB P RUNPRD COIL MANAGEMENT -GRIND FINAL CUT -MAKE UP COIL TUBING CONNECTOR -PULL TEST TO 35K 00:45 - 01:00 0.25 DHB P RUNPRD MAKE UP SWIZZLE STICK,STAB ON INJECTOR AND PUMP SLACK FORWARD IN ORDER TO LOCATE E-LINE;POP OFF,BREAK SVNZZLE AND LOCATE E-LINE 01:00 - 03:15 1.25 DHB P RUNPRD TEST E-LINE,MAKE UP UPPER QUICK,HEAD UP BHI AND MAKE UP LOWER QUICK CONNECT i PRESSURE TEST COIL CONNECTOR TO 3500 PSI HIGH MOBILIZE PACKER TOOLS TO RIG FLOOR "'DAYLIGHT SAVINGS;PUSH TIME AHEAD 1 HOUR... 03:15 - 03:45 0.50 DHB- P RUNPRD PRESSURE TEST BHI DFCV TO 250 PSI LOW/ 3500 PSI HIGH FOR R 5 MINUTES 03:45 - 04:30 0.75 DHB P RUNPRD HOLD PJSM AND MAKE UP 4.5"KB LINER TOP PACKER WL BHA 04:30 - 05:00 0.50 DHB P RUNPRD STAB ON INJECTOR AND PRESSURE TEST QTS TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES 05:00 - 05:30 0.50 DHB N HMAN 12,995.00 RUNPRD CTD PROCEDURE CALLS FOR MINIMUM PUMP RATE OF 1.5 BPM WHILE TRIPPING AFTER PUMPING SLACK BACK,IN ORDER TO ENSURE THE MAJORITY OF THE SLACK IS IN THE DOWN-HOLE END OF THE COIL. BAKER SUPERVISOR RECOMMENDS MINIMUM I CIRCULATING RATE WHILE TRIPPING WITH I LINER TOP PACKER IN ORDER TO AVOID UNINTENTIONALLY SETTING THE PACKER WHILE TRIPPING. STOP AND DISCUSS PLAN FORWARD WITH CTD AND BAKER;DECIDE TO POP OFF AND MANAGE SLACK AT SURFACE. HOLD PJSM WITH NORDIC,CTD AND BAKER. 05:30 - 05:45 0.25 DHB N HMAN 12,995.00 RUNPRD POP OFF INJECTOR,BREAK UQC,PICK UP AND PULL BACK BHA 05:45 - 06:15 0.50 DHB N HMAN 12,995.00 RUNPRD MAKE UP NOZZLE,STAB ON INJECTOR AND CIRCULATE 1.5X COIL VOLUME AT 3 BPM 06:15 - 06:30 0.25 DHB N HMAN 12,995.00 RUNPRD l POP OFF INJECTOR,BREAK NOZZLE,STAB _ BHA,TORQUE UCQ AND STAB INJECTOR 06:30 - 08:45 2.25 LCR P OTHCMP RIH WITH LINER TOP PACKER ASSEMBLY -TEST QTS TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES 08:45 - 09:15 0.50 LCR P OTHCMP LOG CCL FROM 9450 TO 9930'TO GET ON DEPTH WITH THE CCL LOG THAT WAS RAN FOR LINER TOP PLACEMENT.THIS LOG IS TIED INTO THE PDC LOG 09 15 09:35 0.33 LCR P OTHCMP STOP AND WAIT FOR LOG CORRECT DEPTH Printed 3/16/2015 1:28:54PM North America-ALASKA-BP Page 8 of 11 Operation Summary Report Common Well Name:X-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/5/2015 End Date:3/10/2015 X3-016NN-C:(1,196,448.03) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00©74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) 09:35 - 09:40 0.08 LCR P OTHCMP CORRECT DEPTH -12' PU WT=46K RIH WT=20K RIH TO TOL I TOL=9963'BASED ON SLB GAMMA CCL LOG SEAL ASSEMBLY=6.52'SO WE SHOULD NO GO AT 9969.5' FOLLOW OCN#13 TO SET LTP 09:40 - 10:30 0.83 LCR P OTHCMP TAG DOWN AT 9970'SET DOWN 5K TO 9970.46 ANN PSI=3659 PSI BORE PSI=3660 PSI PU AND REPEAT TO CONFIRM TAG 0.1'HIGHER WE ARE ON DEPTH,4.82K WOB ESTABLISH LOSS RATE,LOSS RATE=0.7 BPM,WE ARE RIGHT AT THE MAX LOSS RATE CALL ODE AND DISCUSS WITH BTT HAND ON LOCATION WE ARE OK TO PROCEED 10:30 - 10:40 0.17 LCR P OTHCMP 10:30:00 CLOSE THE EDC,ANN PSI=3660 BORE PSI=3662 10:21:54 EDC CLOSED ANN PSI =3631 PSI SET LTP DO NOT LET ANN PRESSURE DROP BELOW 3490 PSI ANN PSI =3647 PSI LTP SET AT 1800 PSI COIL PRESSURE,ANN 'PSI=3641 PSI TOP OF LINER =9963' LTP LENGTH =7.59' TOP OF LTP=9955.41' 1040 - 11:20 0.67 LCR P OTHCMP OPEN UP TO TAKE RETURNS THROUGH THE MGS&CHOKE,RETURNS ARE 1:1 CIRCULATE 1.5 VOLUMES AS PER OCN FOLLOWING THE MGS USEAGE POLICY LOOKING FOR POTENTIAL GAS PU OFF THE LTP BOTTOMS UP=97 BBLS,CIRC 150 BBLS,IF RETURNS ARE CLEAN SHUT DOWN AND PERFORM 30 MIN FLOW CHECK AS PER THE 'OCN 11:20 - 11:40 0.33 LCR P j OTHCMP BOTTOMS UP IS CLEAN,CIRC 1/2 VOLUME MORE THEN SHUT DOWN TO FLOW CHECK 11:40 - 12:15 0.58 LCR P OTHCMP CIRCULALATED 1.5 VOLUMES NO GAS OR OIL SHOW,LINE UP TO TAKE RETURNS THROUGH THE NORMAL FLOW PATH SHUT DOWN AND FLOW CHECK WELL FOR 30 MINS AS PER THE OCN WELL IS CONTINUING A SMALL PECIL SIZE STREAM PUMP 5 BBLS TO WARM COIL,FOUND A VALVE OPEN FROM THE MGS IN THE SHAKER ROOM,CLOSE VALVE _ 12:15 - 12:50 0.58 LCR P OTHCMP 1218 SHUT DOWN TO FLOW CHECK AGAIN 12:50 - 14:20 1.50 LCR P OTHCMP GOOD NO FLOW,ON LINE WITH INSTANT 1:1 RETURNS POOH 14:20 - 14:40 0.33 LCR P OTHCMP HOLD PJSM TO LD TOOLS AS WERE POOH 14'40 - 14:45 0.08 LCR P OTHCMP 'STOP AT 200'AND FLOW CHECK THE WELL 14:45 - 15:45 1.00 LCR P OTHCMP GOOD NO FLOW,TAG UP,REMOVE THE INJECTOR AND LAY DOWN LTP SETTING BHA. Printed 3/16/2015 1:28:54PM North America-ALASKA-BP Page 9 of 11 Operation Summary Report Common Well Name,X-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/5/2015 End Date:3/10/2015 X3-016NN-C.(1,196,448.03) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM 'Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00©74.94usft(above Mean Sea Level) Date From-To Hrs i Task Code NPT NPT Depth Phase Description of Operations (hr) i (usft) 15:45 - 16:00 0.25 LCR P I OTHCMP GOOD LOW PT INCREASE TO HIGH 16:00 - 16:15 0.25 LCR P i OTHCMP LOST 85 PSI IN THE FIRST 15 MIN 2530 PSI DOWN TO 2445 16:15 - 16:30 0.25 LCR P OTHCMP LAST 5 MIN OF THE TEST PRESSURE STARTING TO CLIMB A LITTLE PRESSURE WAS ROCK SOLID AT 2445 THEN 1 CLIMED UP TO 2457 PSI,I WOULD ATTRIBUTE THIS TO THERMOL EXPANSION CALL ODE,WTL,SUPT ALL AGREE WE HAVE A PASSING TEST RD EQUIPMENT 16:30 - 19.00 2.50 PERF P OTHCMP PREP TO PUMP SLACK OUT FILL COIL PUMPED OUT 285'OF SLACK MU THE CTC AND PULL TEST TO TO 39K STAB ON AND PUMP SLACK PER CTD 19:00 - 19:30 0.50 PERF P OTHCMP LOAD AND LAUNCH 3/4"DRIFT BALL PER SCHLUMBERGER 19:30 - 19:45 0.25 PERF P OTHCMP POP OFF INJECTOR AND RECOVER 3/4" _ DRIFT BALL 19:45 - 20:15 0.50 PERF P OTHCMP HOLD PJSM FOR MAKING UP PERFORATING ASSEMBLY AND 1.25"CSH 20:15 - 23:30 3.25 PERF P OTHCMP MAKE UP PERFORATING ASSEMBLY -PICK UP 36 JOINTS OF GUNS -PICK UP 39 STANDS OF 1.25"CSH _ 23:30 - 00:00 0.50 PERF P OTHCMP RIG DOWN ELEVATORS AND RIG UP INJECTOR SLING;MAKE UP LOCKABLE SWIVELAND STAB ON INJECTOR 3/9/2015 00:00 - 00:15 0.25 PERF P OTHCMP PRESSURE TEST QTS TO 250 PSI LOW/3500 PSI HIGH FOR 5 MINUTES 00:15 - 03:00 2.75 PERF P OTHCMP RIH WITH PERF ASSEMBLY -RIH AT 100 FPM -TIE-IN TO EOP FLAG AND CORRECT DEPTH !(-12') -TAG PBTD AT 12,993',PICK UP AND CONFIRM TAG WITH 4K DOWN 03:00 - 04:00 1.00 PERF P OTHCMP PERFORATE PER SCHLUMBERGER PICK UP TO UP WEIGHT(45K)AND CORRECT TO PBTD OF 12,995' PICK UP TO 5'BELOW BOTTOM SHOT DEPTH AND INITIATE E-FIRE COMMAND -COMPLETE PRESSURE SEQUENCE AND PICK UP TO SHOT DEPTH;40 BBLS HI-VIS PILL SPOTTED OUTSIDE COIL-5 BBLS AFTER SHOTS FIRE -SHOTS FIRE AT BULLNOSE DEPTH OF 112,871';BOTTOM SHOT 12,870.3';LOSE RETURNS -OPEN TO KILL LINE AND FILL ACROSS THE TOP 04 00 - 06 15 2.25 PERF P OTHCMP POH WITH PERF ASSEMBLY -POH AT 60 FPM THROUGH LINER TOP PACKER,HOLDING 250 PSI BACKPRESSURE; RETURNS HEALING UPAS HI-VIS PILL HITS PERFS -POH AT 100 FPM ONCE THROUGH LINER, MAINTAINING HOLE FILL -LOSS RATE DECREASES AND WELL I RETURNS INCREASE TO SLIGHTLY UNDER -1:1 Printed 3/16/2015 1:28 54PM North America-ALASKA-BP Page 10 of 11 Operation Summary Report Common Well Name:X-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/5/2015 End Date:3/10/2015 X3-016NN-C:(1,196,448.03) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/Time:7/6/1980 12:00:00AM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00 t 74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr)_.._-- (usft) 06:15 - 06:45 0.50 PERF P OTHCMP AT SURFACE CIRCULATING FRESH WATER TO LD THE CSH WORK STRING SIDEWAYS WHILE THE CREWS FINISH CHANGE AND AND WALKAROUNDS. 06:45 - 07:00 0.25 PERF P OTHCMP HOLD PJSM TO LD PERF BHA 07:00 07:05 0.08 PERF P OTHCMP INCREASE RATE TO CIRC THE FRESH WATER AROUND THEN SHUT DOWN TO FLOW CHECK WELL 07:05 - 07:15 0.17 PERF P OTHCMP FLOW CHECK WELL LOST 15 BBLS TO THE FORMATION ON THE TOOH 07:15 - 08:30 ' 1.25 PERF P OTHCMP GOOD NO FLOW TAG UP,REMOVE THE INJECTOR,LD THE UPPER BHA,FILL THE HOLE,NO LOSSES TEST THE CROWN-O-MATIC THEN MU THE 12 STANDS IN THE DERRICK TO LD ALL THE CSH SIDEWAYS 08:30 - 08:50 0.33 PERF P OTHCMP ALL HYDRIL RAN,LD SIDEWAYS BLOCKS ARE FROZE UP,BRING TO RIG FLOOR AND PUT HEATER TRUNKS ON THEM TO THAW MONMITOR WELL FLUID IS STATIC IN THE STACK,NO LOSSES 08:50 - 12:00 3.17 PERF P OTHCMP BLOCKS ARE THAWED,PULL&LD CSH SIDEWAYS AND FILL THE WELL EVERY 10 JOINTS 12:00 - 12:30 0.50 PERF P OTHCMP AT THE MARKER JOINT,SLB TCP HAND IS ON THE FLOOR PULLED TO LAST JOINT AND HELD PJSM TO LD SPENT GUNS 12:30 - 15:00 2.50 PERF P OTHCMP PULL GUNS 15:00 - 16:00 1.00 PERF P i OTHCMP ,GUNS OOH,LOAD OUT TCP EQUIPMENT PUT FARR TONGS IN THE STABBING BOX LOAD OUT PERF GUNS AND CSH 16:00 - 18:30 2.50 CONDHL P POST SHUT DOWN TO ALLOW CTS TO CHANGE OUT THE BRUSHES ON THEIR POWER PACK I TRACTION MOTOR 18:30 - 18:45 0.25 CONDHL P POST HOLD PJSM VNTH CTD AND LITTLE RED FOR DIESEL FREEZE PROTECT 18:45 - 20:30 1.75 CONDHL P POST MAKE UP NOZZLE BHA,RIH TO 2500'AND DISPLACE 2500'TO SURFACE WITH DIESEL; POH AT 100 FPM,DISPLACING AT 1.7 BPM WITH 1:1 RETURNS 20:30 - 21:45 1.25 DHB P POST N2 CREW CHANGE,FILL PILL PIT WITH ,CORROSION INHIBITOR,COOL DOWN AND PRESSURE TEST PUMP TRUCK AND HARD LINE NORDIC CREW CHANGE DUE TO FLIGHT CANCELLATIONS;SLOW CIRCULATION TO MINIMUM RATE DURING CHANGE-OUT 21:45 - 22:00 0.25 DHB P POST !DISPLACE COIL WITH WATER,15 BBLS CORROSION INHIBITOR 22:00 - 22:30 0.50 DHB P POST NORDIC CREW CHANGE DUE TO FLIGHT CANCELLATIONS;DECREASE CIRCULATION TO MINIMUM RATE DURING HANDOVER AND I TALK TO CREW ABOUT TAKING IT SLOW 'TONIGHT AFTER A NON-STANDARD CHANGEOVER - Printed 3/16/2015 1:28:54PM North America-ALASKA-BP Page 11 of 11 Operation Summary Report Common Well Name:X-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/5/2015 End Date:3/10/2015 X3-016NN-C:(1,196.448.03) Project:Prudhoe Bay Site:PB X Pad Rig Name/No.:NORDIC 1 Spud Date/me:7/6/1980 12:00:00AM Rig Release:3/10/2015 Rig Contractor:NORDIC CALISTA UWI:500292046700 Active datum:12:10 7/6/1980 00:00©74.94usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 22:30 - 00:00 1.50 DHB P POST CHASE CORROSION INHIBITOR WITH 10 BBLS METHANOL AND PERFORM N2 BLOWDOWN BLEED N2,OPEN WELL TO CLOSED CHOKE AND CONFIRM NO PRESSURE,NO FLOW 3/10/2015 00:00 - 01:00 1.00 DHB P POST HOLD PJSM WITH DSM AND NORDIC;INSTALL TWC AND FILL TREE WITH METHANOL 01:00 - 01:30 0.50 BOPSUR P POST CLOSE TREE VALVES,RIG UP AND LEAK TIGHT TEST THROUGH WING 01:30 - 02:15 0.75 BOPSUR P POST NORDIC CREW PREP FOR SLIP AND CUT 02:15 - 04:30 2.25 BOPSUR P POST HOLD PJSM,RIG DOWN INJECTOR SLING AND SLIP AND CUT 42'OF DRILL LINE 04:30 - 05:30 1.00 BOPSUR P POST BLOW DOWN CHOKE&KILL LINES 05:30 - 08:00 2.50 BOPSUR P POST ND CHOKE&KILL LINES FOR BOP REPLACEMENT(PLANNED MAINTENANCE TIME) 08:00 - 09:00 1.00 BOPSUR P POST CREW CHANGE 09:00 - 10:10 1.17 BOPSUR P POST ND RISER 10:10 - 11:00 0.83 BOPSUR P POST PT NIGHT CAP A ***RELEASE RIG TO 17-04*** Printed 3/16/2015 1:28:54PM Qbp North America - ALASKA - BP Prudhoe Bay PB X Pad X-10 - Slot 10 500292046700 X-10A Design: X-10A Survey Report - Geographic 06 March, 2015 \\ BAKER HUGHES ra" 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay ND Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site: PBX Pad MD Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Well: X-10 North Reference: True Wellbore: X-10A Survey Calculation Method: Minimum Curvature - Design: X-10A Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) • System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) • Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB X Pad,TR-10-14 —!i Site Position: Northing: 5,937,417.970 usft Latitude: 70°14'7.207 N From: Map Easting: 664,667.650 usft Longitude: 148°40'13.706 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.25 ° Well X-10 API No. 500292046700 Well Position +N/-S 0.00 usft Northing: 5,939,642.993 usft • Latitude: 70°14'28.925 N +E/-W 0.00 usft Easting: 665,417.001 usft . Longitude: 148°39'50.513 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 38.87 usft . Wellbore X-10A API no. 500292046701 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2014 3/1/2015 19.40 80.97 57,582 Design X-10A Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,600.00 Vertical Section: Depth From(ND) +N/-S +E/-W Direction (usft) (usft) (usft) (°) 36.94 0.00 0.00 150.84 Survey Program Date: 3/6/2015 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 10,600.00 1 :Sperry-Sun BOSS gyro multi(X-10) BOSS-GYRO Sperry-Sun BOSS gyro multishot 10,631.00 12,945.03 CoilTrak MWD(X-10A) MWD MWD-Standard 3/6/2015 12:33:13PM Page 2 COMPASS 5000.1 Budd 61 0 by Survey Report r� Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site: PB X Pad MD Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Well: X-10 North Reference: True Wellbore: X-10A Survey Calculation Method: Minimum Curvature Design: X-10A Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 36.94 0.00 0.00 36.94 0.00 0.00 5,939,642.993 665,417.001 70°14'28.925 N 148°39'50.513 W 100.00 0.33 158.61 100.00 -0.17 0.07 5,939,642.825 665,417.071 70°14'28.923 N 148°39'50.512 W 200.00 0.42 172.61 200.00 -0.80 0.22 5,939,642.197 665,417.237 70°14'28.917 N 148°39'50.507 W 300.00 0.37 171.11 300.00 -1.48 0.32 5,939,641.517 665,417.349 70°14'28.911 N 148°39'50.504 W 1 400.00 0.35 192.69 399.99 -2.10 0.30 5,939,640.900 665,417.345 70°14'28.904 N 148°39'50.505 W 500.00 0.43 158.70 499.99 -2.75 0.37 5,939,640.254 665,417.428 70°14'28.898 N 148°39'50.503 W 600.00 0.32 173.11 599.99 -3.37 0.54 5,939,639.631 665,417.612 70°14'28.892 N 148°39'50.498 W 700.00 0.42 179.81 699.99 -4.02 0.57 5,939,638.988 665,417.661 70°14'28.886 N 148°39'50.497 W 800.00 0.52 175.61 799.98 -4.84 0.61 5,939,638.170 665,417.714 70°14'28.878 N 148°39'50.496 W 900.00 0.50 153.90 899.98 -5.68 0.83 5,939,637.331 665,417.960 70°14'28.869 N 148°39'50.489 W 1,000.00 0.33 206.29 999.98 -6.33 0.90 5,939,636.683 665,418.038 70°14'28.863 N 148°39'50.487 W 1,100.00 0.47 211.29 1,099.97 -6.94 0.56 5,939,636.067 665,417.711 70°14'28.857 N 148°39'50.497 W 1,200.00 0.55 213.10 1,199.97 -7.69 0.08 5,939,635.304 665,417.253 70°14'28.849 N 148°39'50.511 W 1,300.00 0.35 168.61 1,299.97 -8.39 -0.12 5,939,634.599 665,417.066 70°14'28.843 N 148°39'50.517 W 1,400.00 0.35 201.60 1,399.97 -8.98 -0.17 5,939,634.014 665,417.027 70°14'28.837 N 148°39'50.518 W 1,500.00 0.22 172.31 1,499.96 -9.45 -0.26 5,939,633.538 665,416.951 70°14'28.832 N 148°39'50.521 W 1,600.00 0.53 88.19 1,599.96 -9.63 0.23 5,939,633.373 665,417.442 70°14'28.830 N 148°39'50.507 W 1,700.00 0.33 83.90 1,699.96 -9.58 0.98 5,939,633.435 665,418.190 70°14'28.831 N 148°39'50.485 W 1,800.00 0.45 95.20 1,799.96 -9.59 1.66 5,939,633.445 665,418.867 70°14'28.831 N 148°39'50.465 W 1,900.00 0.35 114.41 1,899.96 -9.75 2.33 5,939,633.298 665,419.540 70°14'28.829 N 148°39'50.446 W 2,000.00 0.78 113.50 1,999.95 -10.15 3.23 5,939,632.920 665,420.451 70°14'28.825 N 148°39'50.420 W 2,100.00 0.70 114.61 2,099.94 -10.67 4.41 5,939,632.420 665,421.641 70°14'28.820 N 148°39'50.385 W 2,200.00 0.42 140.00 2,199.94 -11.21 5.20 5,939,631.903 665,422.444 70°14'28.815 N 148°39'50.362 W 2,300.00 0.47 167.61 2,299.93 -11.89 5.52 5,939,631.229 665,422.782 70°14'28.808 N 148°39'50.353 W 2,400.00 0.73 143.50 2,399.93 -12.80 5.99 5,939,630.326 665,423.269 70°14'28.799 N 148°39'50.339 W 2,500.00 0.97 133.40 2,499.92 -13.90 6.98 5,939,629.255 665,424.287 70°14'28.788 N 148°39'50.310 W 2,600.00 0.62 150.40 2,599.91 -14.95 7.87 5,939,628.223 665,425.192 70°14'28.778 N 148°39'50.285 W 2,700.00 1.53 226.79 2,699.89 -16.33 7.16 5,939,626.823 665,424.516 70°14'28.764 N 148°39'50.305 W 2,800.00 2.58 170.70 2,799.84 -19.47 6.55 5,939,623.675 665,423.976 70°14'28.734 N 148°39'50.323 W 2,850.00 3.92 152.40 2,849.76 -22.09 7.52 5,939,621.072 665,425.007 70°14'28.708 N 148°39'50.295 W 2,900.00 6.47 136.70 2,899.55 -25.66 10.25 5,939,617.567 665,427.809 70°14'28.673 N 148°39'50.216 W 2,950.00 7.02 137.20 2,949.20 -29.95 14.26 5,939,613.364 665,431.910 70°14'28.631 N 148°39'50.099 W'' 3,000.00 7.42 137.11 2,998.81 -34.56 18.53 5,939,608.852 665,436.283 70°14'28.585 N 148°39'49.975 W 3,050.00 8.78 143.31 3,048.31 -39.98 23.01 5,939,603.526 665,440.878 70°14'28.532 N 148°39'49.845 W 3,100.00 10.83 150.11 3,097.58 -47.12 27.63 5,939,596.496 665,445.655 70°14'28.462 N 148°39'49.710 W 3,200.00 14.90 148.31 3,195.05 -66.21 39.07 5,939,577.660 665,457.511 70°14'28.274 N 148°39'49.378 W 3,300.00 16.77 147.61 3,291.25 -89.33 53.55 5,939,554.861 665,472.497 70°14'28.046 N 148°39'48.957 W 3,400.00 19.38 149.40 3,386.30 -115.80 69.73 5,939,528.757 665,489.249 70°14'27.786 N 148°39'48.486 W 3,500.00 22.20 149.70 3,479.78 -146.40 87.71 5,939,498.562 665,507.896 70°14'27.485 N 148°39'47.964 W 3,600.00 25.00 149.50 3,571.41 -180.93 107.97 5,939,464.492 665,528.908 70°14'27.146 N 148°39'47.375 W 3,700.00 26.68 150.31 3,661.41 -218.64 129.82 5,939,427.270 665,551.575 70°14'26.775 N 148°39'46.740 W 3,800.00 29.07 150.90 3,749.80 -259.37 152.76 5,939,387.050 665,575.399 70°14'26.374 N 148°39'46.073 W 3,900.00 32.43 150.50 3,835.73 -303.95 177.78 5,939,343.035 665,601.396 70°14'25.936 N 148°39'45.346 W 4,000.00 35.02 150.81 3,918.89 -352.35 204.98 5,939,295.252 665,629.651 70°14'25.460 N 148°39'44.555 W 4,100.00 38.87 150.90 3,998.80 -404.83 234.25 5,939,243.425 665,660.059 70°14'24.944 N 148°39'43.704 W 4,200.00 41.72 151.61 4,075.06 -461.53 265.34 5,939,187.423 665,692.381 70°14'24.386 N 148°39'42.801 W 4,300.00 42.10 151.81 4,149.48 -520.35 296.99 5,939,129.317 665,725.318 70°14'23.807 N 148°39'41.880 W 4,400.00 42.33 151.90 4,223.55 -579.60 328.69 5,939,070.785 665,758.303 70°14'23.225 N 148°39'40.959 W 4,500.00 41.72 152.50 4,297.83 -638.82 359.91 5,939,012.271 665,790.816 70°14'22.642 N 148°39'40.052 W 4,600.00 41.33 152.70 4,372.70 -697.67 390.42 5,938,954.102 665,822.607 70°14'22.063 N 148°39'39.165 W 4,700.00 41.65 152.90 4,447.61 -756.60 420.70 5,938,895.862 665,854.173 70°14'21.484 N 148°39'38.285 W 4,800.00 41.83 153.70 4,522.22 -816.07 450.61 5,938,837.061 665,885.381 70°14'20.899 N 148°39'37.416 W 4,900.00 42.18 154.31 4,596.53 -876.22 479.94 5,938,777.574 665,916.020 70°14'20.307 N 148°39'36.563 W 5,000.00 42.42 154.70 4,670.49 -936.97 508.91 5,938,717.480 665,946.312 70°14'19.710 N 148°39'35.721 W 5,100.00 42.35 155.20 4,744.36 -998.04 537.45 5,938,657.056 665,976.186 70°14'19.109 N 148°39'34.892 W 3/6/2015 12:33.13PM Page 3 COMPASS 5000.1 Build 61 rr,P- O bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site: PB X Pad MD Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Well: X-10 North Reference: True Wellbore: X-10A Survey Calculation Method: Minimum Curvature Design: X-10A Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (0) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 5,200.00 42.32 156.00 4,818.28 -1,059.37 565.27 5,938,596.355 666,005.344 70°14'18.506 N 148°39'34.083 W 5,300.00 42.08 156.50 4,892.36 -1,120.85 592.33 5,938,535.485 666,033.738 70°14'17.901 N 148°39'33.297 W 5,400.00 42.18 157.11 4,966.52 -1,182.51 618.75 5,938,474.425 666,061.503 70°14'17.295 N 148°39'32.529 W 5,500.00 42.25 157.40 5,040.59 -1,244.48 644.73 5,938,413.048 666,088.833 70°14'16.685 N 148°39'31.774 W 5,600.00 42.65 157.50 5,114.37 -1,306.81 670.61 5,938,351.301 666,116.076 70°14'16.072 N 148°39'31.022 W 5,700.00 43.00 157.50 5,187.72 -1,369.61 696.62 5,938,289.090 666,143.459 70°14'15.455 N 148°39'30.266 W 5,800.00 43.15 157.61 5,260.76 -1,432.73 722.70 5,938,226.560 666,170.911 70°14'14.834 N 148°39'29.509 W 5,900.00 44.15 157.50 5,333.12 -1,496.53 749.05 5,938,163.362 666,198.656 70°14'14.206 N 148°39'28.743 W 6,000.00 44.75 157.61 5,404.50 -1,561.25 775.79 5,938,099.246 666,226.804 70°14'13.570 N 148°39'27.966 W 6,100.00 45.03 157.40 5,475.35 -1,626.46 802.79 5,938,034.653 666,255.229 70°14'12.928 N 148°39'27.181 W 6,200.00 45.45 157.11 5,545.76 -1,691.94 830.24 5,937,969.792 666,284.111 70°14'12.284 N 1460 39'26.384 W 6,300.00 45.87 156.70 5,615.66 -1,757.73 858.30 5,937,904.640 666,313.601 70°14'11.637 N 148°39'25.568 W 6,400.00 45.83 156.50 5,685.31 -1,823.58 886.79 5,937,839.436 666,343.533 70°14'10.990 N 148°39'24.741 W 6,500.00 46.58 156.40 5,754.52 -1,889.75 915.63 5,937,773.919 666,373.816 70°14'10.339 N 148°39'23.903 W 6,600.00 47.08 156.50 5,822.93 -1,956.61 944.77 5,937,707.721 666,404.414 70°14'9.681 N 148°39'23.056 W 6,700.00 46.65 156.31 5,891.31 -2,023.48 973.98 5,937,641.509 666,435.081 70°14'9.024 N 148°39'22.207 W 6,800.00 47.05 156.50 5,959.70 -2,090.34 1,003.19 5,937,575.314 666,465.741 70°14'8.366 N 148°39'21.359 W 6,900.00 46.40 156.20 6,028.25 -2,157.03 1,032.39 5,937,509.283 666,496.401 70°14'7.710 N 148°39'20.510 W 7,000.00 46.28 156.31 6,097.28 -2,223.25 1,061.52 5,937,443.722 666,526.976 70°14'7.059 N 148°39'19.664 W 7,100.00 45.95 156.20 6,166.61 -2,289.22 1,090.54 5,937,378.407 666,557.436 70°14'6.410 N 148°39'18.821 W 7,200.00 45.77 155.81 6,236.25 -2,354.79 1,119.73 5,937,313.506 666,588.048 70°14'5.765 N 148°39'17.973 W 7,300.00 46.50 156.31 6,305.54 -2,420.68 1,148.98 5,937,248.273 666,618.738 70°14'5.117 N 148°39'17.123 W 7,400.00 45.12 155.81 6,375.25 -2,486.21 1,178.07 5,937,183.397 666,649.259 70°14'4.472 N 148°39'16.278 W 7,500.00 44.52 155.61 6,446.18 -2,550.46 1,207.07 5,937,119.805 666,679.654 70°14'3.840 N 148°39'15.436 W 7,600.00 44.33 155.40 6,517.59 -2,614.16 1,236.09 5,937,056.764 666,710.065 70°14'3.214 N 148°39'14.593 W 7,700.00 44.00 154.90 6,589.33 -2,677.38 1,265.37 5,936,994.205 666,740.721 70°14'2.592 N 148°39'13.742 W 7,800.00 43.45 154.40 6,661.59 -2,739.85 1,294.96 5,936,932.409 666,771.674 70°14'1.978 N 148°39'12.883 W 7,900.00 42.90 154.20 6,734.52 -2,801.50 1,324.63 5,936,871.425 666,802.690 70°14'1.371 N 148°39'12.021 W 8,000.00 41.95 153.70 6,808.34 -2,862.11 1,354.25 5,936,811.485 666,833.634 70°14'0.775 N 148°39'11.160 W 8,100.00 41.42 153.40 6,883.02 -2,921.65 1,383.87 5,936,752.611 666,864.552 70°14'0.189 N 148°39'10.300 W 8,200.00 40.55 153.70 6,958.51 -2,980.37 1,413.09 5,936,694.551 666,895.045 70°13'59.612 N 148°39'9.451 W 8,300.00 39.70 153.11 7,034.97 -3,038.00 1,441.94 5,936,637.574 666,925.149 70°13'59.045 N 148°39'8.613 W 8,400.00 39.00 153.20 7,112.30 -3,094.57 1,470.57 5,936,581.648 666,955.014 70°13'58.489 N 148°39'7.781 W 8,500.00 38.63 152.61 7,190.21 -3,150.37 1,499.12 5,936,526.490 666,984.777 70°13'57.940 N 148°39'6.952 W 8,600.00 37.55 152.61 7,268.92 -3,205.14 1,527.50 5,936,472.356 667,014.350 70°13'57.401 N 148°39'6.128 W 8,700.00 36.58 155.81 7,348.72 -3,259.39 1,553.73 5,936,418.705 667,041.764 70°13'56.867 N 148°39'5.366 W i 8,800.00 34.75 161.90 7,429.99 -3,313.68 1,574.80 5,936,364.892 667,064.021 70°13'56.333 N 148°39'4.754 W 8,900.00 34.45 163.31 7,512.30 -3,367.86 1,591.78 5,936,311.098 667,082.182 70°13'55.800 N 148°39'4.261 W 9,000.00 33.68 164.50 7,595.14 -3,421.68 1,607.31 5,936,257.642 667,098.892 70°13'55.271 N 148°39'3.810 W 9,100.00 33.45 165.50 7,678.47 -3,475.08 1,621.62 5,936,204.570 667,114.370 70°13'54.746 N 148°39'3.395 W 9,200.00 32.28 167.81 7,762.47 -3,527.87 1,634.16 5,936,152.074 667,128.064 70°13'54.227 N 148°39'3.031 W 9,300.00 32.65 166.90 7,846.84 -3,580.24 1,645.91 5,936,099.974 667,140.962 70°13'53.712 N 148°39'2.689 W 9,400.00 32.62 167.20 7,931.05 -3,632.80 1,658.00 5,936,047.699 667,154.197 70°13'53.195 N 148°39'2.339 W 9,500.00 32.93 168.11 8,015.13 -3,685.68 1,669.57 5,935,995.087 667,166.925 70°13'52.675 N 148°39'2.003 W 9,600.00 34.22 169.70 8,098.45 -3,739.95 1,680.20 5,935,941.071 667,178.741 70°13'52.141 N 148°39'1.694 W 9,700.00 35.52 171.31 8,180.49 -3,796.33 1,689.62 5,935,884.910 667,189.393 70°13'51.586 N 148°39'1.421 W 9,800.00 38.20 173.11 8,260.50 -3,855.76 1,697.72 5,935,825.681 667,198.794 70°13'51.002 N 148°39'1.186 W 9,900.00 36.37 175.11 8,340.06 -3,916.00 1,703.95 5,935,765.590 667,206.352 70°13'50.409 N 148°39'1.005 W 10,000.00 37.40 177.90 8,420.05 -3,975.90 1,707.60 5,935,705.792 667,211.305 70°13'49.820 N 148°39'0.900 W 10,100.00 38.05 180.39 8,499.15 -4,037.07 1,708.50 5,935,644.661 667,213.550 70°13'49.219 N 148°39'0.874 W 10,200.00 38.95 182.39 8,577.41 -4,099.29 1,706.98 5,935,582.422 667,213.396 70°13'48.607 N 148°39'0.918 W 10,300.00 40.08 184.79 8,654.56 -4,162.79 1,702.98 5,935,518.863 667,210.791 70°13'47.982 N 148°39'1.035 W 10,400.00 40.90 186.89 8,730.62 -4,227.37 1,696.36 5,935,454.153 667,205.594 70°13'47.347 N 148°39'1.228 W 10,500.00 42.13 190.69 8,805.50 -4,292.84 1,686.21 5,935,388.478 667,196.883 70°13'46.703 N 148°39'1.523 W 10,550.00 39.72 195.29 8,843.29 -4,324.74 1,678.88 5,935,356.425 667,190.258 70°13'46.389 N 148°39'1.736 W 3/6/2015 12.33:13PM Page 4 COMPASS 5000.1 Build 61 1114- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay ND Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site: PB X Pad MD Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Well: X-10 North Reference: True Wellbore: X-10A Survey Calculation Method: Minimum Curvature Design: X-10A Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 10,600.00 37.77 199.50 8,882.29 -4,354.60 1,669.56 5,935,326.377 667,181.590 70°13'46.096 N 148°39'2.007 W TIP 10,631.00 37.16 199.53 8,906.90 -4,372.37 1,663.26 5,935,308.471 667,175.682 70°13'45.921 N 148°39'2.190 W KOP 10,660.36 38.63 198.32 8,930.07 -4,389.43 1,657.41 5,935,291.290 667,170.213 70°13'45.753 N 148°39'2.360 W Interpolated Azimuth 10,693.68 42.26 197.16 8,955.42 -4,410.01 1,650.84 5,935,270.566 667,164.090 70°13'45.551 N 148°39'2.552 W Interpolated Azimuth 10,723.80 46.12 196.27 8,977.01 -4,430.12 1,644.80 5,935,250.335 667,158.501 70°13'45.353 N 148°39'2.727 W Interpolated Azimuth 10,754.12 51.49 195.47 8,996.97 -4,452.06 1,638.57 5,935,228.266 667,152.754 70°13'45.137 N 148°39'2.908 W Interpolated Azimuth 10,784.05 56.90 194.76 9,014.48 -4,475.48 1,632.25 5,935,204.709 667,146.948 70°13'44.907 N 148°39'3.092 W Interpolated Azimuth 10,813.74 62.94 194.12 9,029.35 -4,500.35 1,625.85 5,935,179.707 667,141.096 70°13'44.662 N 148°39'3.278 W 10,813.75 62.94 194.12 9,029.36 -4,500.36 1,625.85 5,935,179.698 667,141.094 70°13'44.662 N 148°39'3.278 W 10,846.50 69.99 194.95 9,042.43 -4,529.41 1,618.31 5,935,150.497 667,134.198 70°13'44.377 N 148°39'3.497 W 10,873.72 75.14 194.19 9,050.58 -4,554.53 1,611.79 5,935,125.235 667,128.223 70°13'44.130 N 148°39'3.687 W 10,904.92 80.34 192.61 9,057.20 -4,584.18 1,604.73 5,935,095.441 667,121.816 70°13'43.838 N 148°39'3.892 W 10,936.12 85.61 194.58 9,061.02 -4,614.27 1,597.45 5,935,065.206 667,115.200 70°13'43.542 N 148°39'4.104 W 10,963.66 91.17 196.67 9,061.79 -4,640.77 1,590.04 5,935,038.552 667,108.372 70°13'43.281 N 148°39'4.319 W 10,993.58 96.33 196.22 9,059.83 -4,669.39 1,581.59 5,935,009.750 667,100.553 70°13'43.000 N 148°39'4.565 W 11,023.64 102.49 195.55 9,054.92 -4,697.90 1,573.47 5,934,981.072 667,093.067 70°13'42.720 N 148°39'4.801 W 11,061.73 106.34 192.65 9,045.44 -4,733.67 1,564.48 5,934,945.120 667,084.862 70°13'42.368 N 148°39'5.062 W' 11,090.67 106.28 188.68 9,037.31 -4,760.96 1,559.34 5,934,917.726 667,080.323 70°13'42.099 N 148°39'5.212 W 11,120.67 106.03 186.23 9,028.96 -4,789.53 1,555.60 5,934,889.084 667,077.213 70°13'41.818 N 148°39'5.321 W 11,150.88 105.00 183.31 9,020.88 -4,818.53 1,553.19 5,934,860.035 667,075.432 70°13'41.533 N 148°39'5.391 W 11,180.63 102.49 180.31 9,013.81 -4,847.41 1,552.28 5,934,831.146 667,075.157 70°13'41.249 N 148°39'5.418 W 11,210.83 100.03 179.14 9,007.91 -4,877.02 1,552.42 5,934,801.543 667,075.951 70°13'40.958 N 148°39'5.414 W 11,240.81 97.54 179.22 9,003.33 -4,906.65 1,552.84 5,934,771.939 667,077.024 70°13'40.667 N 148°39'5.401 W 11,270.83 95.01 180.81 9,000.05 -4,936.48 1,552.84 5,934,742.111 667,077.670 70°13'40.373 N 148°39'5.402 W 11,301.23 92.80 178.66 8,997.98 -4,966.81 1,552.98 5,934,711.798 667,078.477 70°13'40.075 N 148°39'5.398 W 11,331.22 92.80 175.02 8,996.52 -4,996.71 1,554.63 5,934,681.940 667,080.783 70°13'39.781 N 148°39'5.350 W 11,361.25 92.70 171.80 8,995.08 -5,026.51 1,558.07 5,934,652.231 667,084.878 70°13'39.488 N 148°39'5.250 W 11,391.22 91.26 170.88 8,994.04 -5,056.11 1,562.58 5,934,622.730 667,090.036 70°13'39.197 N 148°39'5.120 W 11,421.33 89.69 167.10 8,993.79 -5,085.66 1,568.33 5,934,593.317 667,096.432 70°13'38.906 N 148°39'4.953 W 11,451.20 90.18 163.48 8,993.82 -5,114.55 1,575.91 5,934,564.606 667,104.647 70°13'38.622 N 148°39'4.733 W 11,480.94 90.43 160.25 8,993.67 -5,142.81 1,585.17 5,934,536.559 667,114.519 70°13'38.344 N 148°39'4.464 W 11,510.79 90.46 157.23 8,993.43 -5,170.62 1,595.99 5,934,508.991 667,125.948 70°13'38.070 N 148°39'4.150 W 11,541.23 90.52 154.14 8,993.17 -5,198.36 1,608.52 5,934,481.539 667,139.085 70°13'37.798 N 148°39'3.786 W 11,570.92 89.45 151.31 8,993.18 -5,224.74 1,622.12 5,934,455.460 667,153.264 70°13'37.538 N 148°39'3.391 W' 11,601.17 88.89 148.00 8,993.62 -5,250.84 1,637.40 5,934,429.704 667,169.110 70°13'37.281 N 148°39'2.947 W 11,630.55 89.85 144.48 8,993.94 -5,275.26 1,653.73 5,934,405.649 667,185.964 70°13'37.041 N 148°39'2.473 W 11,661.42 89.85 140.48 8,994.02 -5,299.74 1,672.52 5,934,381.590 667,205.293 70°13'36.800 N 148°39'1.927 W 11,690.95 90.74 138.09 8,993.87 -5,322.12 1,691.78 5,934,359.639 667,225.038 70°13'36.580 N 148°39'1.368 W 11,720.86 89.26 133.53 8,993.87 -5,343.56 1,712.63 5,934,338.663 667,246.345 70°13'36.369 N 148°39'0.762 W 11,750.92 89.29 129.26 8,994.25 -5,363.43 1,735.17 5,934,319.293 667,269.317 70°13'36.174 N 148°39'0.108 W 11,777.19 89.17 124.63 8,994.61 -5,379.22 1,756.16 5,934,303.975 667,290.644 70°13'36.018 N 148°38'59.498 W 11,810.37 90.18 120.23 8,994.79 -5,397.01 1,784.16 5,934,286.806 667,319.024 70°13'35.843 N 148°38'58.685 W 11,840.15 90.06 115.34 8,994.73 -5,410.88 1,810.49 5,934,273.510 667,345.658 70°13'35.707 N 148°38'57.920 W 11,871.32 89.32 109.88 8,994.90 -5,422.86 1,839.26 5,934,262.166 667,374.675 70°13'35.589 N 148°38'57.084 W 11,906.02 89.75 105.54 8,995.18 -5,433.42 1,872.30 5,934,252.342 667,407.943 70°13'35.485 N 148°38'56.125 W ' 11,933.50 91.04 102.06 8,994.99 -5,439.97 1,898.98 5,934,246.376 667,434.760 70°13'35.421 N 148°38'55.350 W 11,961.32 92.15 98.78 8,994.22 -5,445.00 1,926.33 5,934,241.948 667,462.208 70°13'35.371 N 148°38'54.555 W 3/6/2015 12:33:13PM Page 5 COMPASS 5000.1 Build 61 0 by Survey Report Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site: PB X Pad MD Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Well: X-10 North Reference: True Wellbore: X-10A Survey Calculation Method: Minimum Curvature Design: X-10A Database: EDM R5K-Alaska PROD-ANCP1 1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/_S +El-W Northing Easting (usft) (0) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 11,992.14 92.12 94.92 8,993.07 -5,448.67 1,956.90 5,934,238.948 667,492.852 70°13'35.335 N 148°38'53.667 W', 12,020.08 93.53 91.06 8,991.69 -5,450.13 1,984.77 5,934,238.104 667,520.738 70°13'35.320 N 148°38'52.858 W 12,052.22 93.02 85.82 8,989.85 -5,449.25 2,016.83 5,934,239.680 667,552.773 70°13'35.329 N 148°38'51.926 W 12,080.24 90.58 81.83 8,988.97 -5,446.24 2,044.67 5,934,243.303 667,580.534 70°13'35.359 N 148°38'51.118 W 12,110.69 88.80 78.41 8,989.14 -5,441.02 2,074.66 5,934,249.183 667,610.402 70°13'35.410 N 148°38'50.246 W 12,140.38 86.83 74.36 8,990.27 -5,434.04 2,103.49 5,934,256.794 667,639.068 70°13'35.478 N 148°38'49.409 W 12,170.38 88.56 69.14 8,991.48 -5,424.65 2,131.94 5,934,266.800 667,667.310 70°13'35.571 N 148°38'48.582 W' 12,200.33 86.74 65.79 8,992.71 -5,413.19 2,159.58 5,934,278.869 667,694.685 70°13'35.683 N 148°38'47.779 W 12,230.58 87.94 61.38 8,994.11 -5,399.75 2,186.63 5,934,292.898 667,721.436 70°13'35.815 N 148°38'46.993 W 12,260.72 87.88 56.13 8,995.21 -5,384.13 2,212.37 5,934,309.076 667,746.828 70°13'35.969 N 148°38'46.245 W 12,290.74 88.68 53.34 8,996.11 -5,366.80 2,236.87 5,934,326.931 667,770.938 70°13'36.139 N 148°38'45.534 W 12,315.63 90.06 51.43 8,996.39 -5,351.62 2,256.59 5,934,342.549 667,790.312 70°13'36.289 N 148°38'44.961 W 12,347.48 89.94 47.45 8,996.39 -5,330.91 2,280.78 5,934,363.779 667,814.042 70°13'36.492 N 148°38'44.258 W 12,378.12 92.67 42.89 8,995.69 -5,309.32 2,302.49 5,934,385.836 667,835.279 70°13'36.704 N 148°38'43.627 W 12,404.89 93.13 39.46 8,994.33 -5,289.20 2,320.09 5,934,406.337 667,852.431 70°13'36.902 N 148°38'43.115 W 12,436.51 92.95 34.92 8,992.66 -5,264.05 2,339.18 5,934,431.896 667,870.954 70°13'37.150 N 148°38'42.561 W 12,465.66 90.98 29.73 8,991.66 -5,239.44 2,354.75 5,934,456.839 667,885.981 70°13'37.392 N 148°38'42.108 W 12,495.63 92.30 25.62 8,990.80 -5,212.92 2,368.66 5,934,483.660 667,899.306 70°13'37.652 N 148°38'41.704 W 12,526.49 92.42 20.60 8,989.53 -5,184.57 2,380.76 5,934,512.267 667,910.778 70°13'37.931 N 148°38'41.352 W 12,558.46 92.33 16.08 8,988.20 -5,154.26 2,390.80 5,934,542.790 667,920.158 70°13'38.229 N 148°38'41.060 W 12,586.98 90.67 11.61 8,987.45 -5,126.58 2,397.62 5,934,570.605 667,926.369 70°13'38.501 N 148°38'40.862 W 12,618.00 91.72 16.54 8,986.81 -5,096.51 2,405.16 5,934,600.834 667,933.246 70°13'38.797 N 148°38'40.642 W 12,648.70 91.04 20.41 8,986.07 -5,067.41 2,414.89 5,934,630.142 667,942.328 70°13'39.083 N 148°38'40.360 W 12,682.31 91.62 25.12 8,985.29 -5,036.43 2,427.89 5,934,661.392 667,954.643 70°13'39.388 N 148°38'39.982 W 12,705.79 91.47 28.54 8,984.65 -5,015.49 2,438.48 5,934,682.559 667,964.772 70°13'39.594 N 148°38'39.674 W 12,735.71 91.63 33.14 8,983.84 -4,989.82 2,453.81 5,934,708.561 667,979.533 70°13'39.846 N 148°38'39.228 W 12,764.23 90.98 36.90 8,983.19 -4,966.47 2,470.17 5,934,732.259 667,995.375 70°13'40.076 N 148°38'38.753 W 12,801.75 89.82 43.43 8,982.93 -4,937.82 2,494.35 5,934,761.436 668,018.925 70°13'40.358 N 148°38'38.050 W 12,825.25 88.80 42.25 8,983.21 -4,920.59 2,510.33 5,934,779.011 668,034.519 70°13'40.527 N 148°38'37.586 W 12,854.05 88.99 51.06 8,983.77 -4,900.84 2,531.25 5,934,799.209 668,054.999 70°13'40.721 N 148°38'36.978 W 12,887.45 89.45 55.38 8,984.23 -4,880.85 2,557.99 5,934,819.781 668,081.295 70°13'40.918 N 148°38'36.201 W 12,915.03 91.54 59.73 8,983.99 -4,866.06 2,581.26 5,934,835.078 668,104.230 70°13'41.063 N 148°38'35.525 W 12,945.03 90.03 63.60 8,983.58 -4,851.82 2,607.66 5,934,849.887 668,130.307 70°13'41.203 N 148°38'34.758 W 13,032.00 90.03 63.60 8,983.53 . -4,813.16 2,685.56 5,934,890.254 668,207.334 70°13'41.583 N 148°38'32.494 W Projection to TD 3/6/2015 12:33:13PM Page 6 COMPASS 5000.1 Build 61 N O L N O) a) C m N • co W . Co W d J C N O = E O_ E o F W0 U c aW a7 C ) r) c a S O 0 ac)) o L m O Z F c 21 d U u! n < 1-0 CO O O C 0 5 4 a) m O W0 0 J o)N a) - Q y (n > V) 03 U) 2 N _ 0-' N O O] m J = .Co E. 0 in - o 0 o 0 o0 0. m W Co w 0 0 0 0 0 0 Eo a cc?) 0 0 0 0 N CI (O -, = Co N y N v 0 .- 0 0 m X co N O O N O O Co CO M E O L CO CD > CoW L' a) �` ho CO Co Co N I - N Nx U O_I— co N O O W EO NFU r' O U c o c ja10 Z Er O Z ro Co o N o a' O E O g.:13!Lu a) O. w co .Y 2 C) cc u) Q X H '� Et d o a - 0 1 c N IY u) CC EE 2 2 LL C C) J O N NE 0 o_aa.0m CJ) Cl w E > ' U J 0 • 0 } H a) H O• C J COLO O a) N u) N t 0 N O C 'ai C E co j co O (h E (p N N d d `� Q Q O a CO d Cr) p 6 Cc _c n N Co > E �41 c m � c v m m Z mEa) . o d Q re 0 o 0 v E --__No E o c m x X ? > m uU iQ p O O W W CO F_ c M >o = O O Co 'o BU + 'o 3 • 0 O a Q = a 0N 0 0m p, Co ci E a0o a) E a a LL E Co• N Co o Q W CA t7 -. 2 .5 Q a 0 Co t 0 I a a) 9 0 o 0 r CoEt ce Y u_ Z o r O .. U m o N Z 01 w CO co 75 O V Co CO O a E N 0 N Co• O_ Z • fn O E LL X I a) Co m a) 0) 0 )n N a v 00 a o m vE Co E L c Z > 0 v) aii m Com c o 7) 6 Cl)- -2 a cr E C E I- H z ,L > > w _ 0 N• - (p c �) a Z Y fn O U 5 H O C7 5 Q U c 0 Q u) 0 ce 0 0 N ci a W m CO Q 3 cL ai Z▪ _ < J W a) a) O 0 0 W X a) W 2 ccW a Z m O (74W Y o 0 Z W N Co O N •0w 0 w wZ CO U a Co p - cc so- m y LL W Q 0 J O 2 n W O 0 o Ce 1- U 0 0 C cn Lu o 0 J u) a z .. w U a iN Cl) 0 u) 7C Q Z. Co Z E Y O o Z O W W CO p n ti O1 N E m 0 O 0 E Co W Z 1E , " co _co po I�O 2' ? 4. m m .. 0 co 3 3 U z N o m a) m o E6 co ") d E E 0 a) C a I T O '0 0 N > H C) E Co a) O a) "' N O U N a) (n E )I~ 2 i)n d C C O C) O Z �>. m T O Y ,C E 0 c c 3. Co Co n o .. w I- n )n o N � v a O 0) C O S 17 E E Co Co .0 9 ,' O' U Co -o N O 0 CO 0 CD CD ^ ♦- U a`1.w 0 ' U 0 d c 'X ti a } U) O 2 0 0 0 0 0 0 k ® ®� tE E CA \ _ as a in \ � � � I � co 4 $ / 42 & CO \ 2 - on - zz a) 3 ± ] - ' - / ® � - 12 §� - � ° \ ) 2 E _ F ° E )\ \ • % .. a12 caz § \ rs CC• \ \ \ k —LO -J : ƒ { CO � E e co z z > /t \ j oo2 = = z _ o_ } & c \ } \ ca } ° k ct \ ' % ) , / & .. f \ 49' 7 •2 \ / / $ / / k k k ) / \ c \ ( # § 3 * ƒ I ) k ® } ) k q ' s § E = f \ _ ) / / \ E 2 $ 2 o f \ c _ a 7 0 \ § 7 f 0 _ § £ 3 \ = 3 ■ § \ E « u \ ) E ! 0 — — = e m o f p _ _ } / r- a2 ( z '-- as a co • E 2 - 3q = 2'� / -! � ) \ ® ` ) E _ ) ) / \ ® \ f # z \ f . mfJ # � eon cn / 3f -2.F- ] � � ¥ / k E ± s { / 3 « f \ ¥ I al X � §, aS ca s— ( e & f o /w < oQt 10 ] J J z — 7 2• Ei CV es- y $ 2 - 4 — \ - . .. . \ 3 L z - z z \ § / H ®s. E \ \ ..7.. & § CO f « z 0 e 3 0 J CCIrI22 ( & a 2 CV A — o g g y $ .. / ) k 2 } § > > ( 0 F. tn u_ _ % a R E .. j § k ) -o Cr_ k , ( u = 2 e c E § 0 2 ± 3 = « ° k / 0 3 § 3 M a a + RECEIVED 21 5 C 0 4 '.' MAR 2 4 2015 2 5 5 8 3 SI PRINT DISTRIBUTION LIST 2 5 5 8 4 B HUGHES AOGCC Please sign and return one copy of this transmittal form to: COMPANY BP Exploration Alaska Inc BP Exploration (Alaska) Inc. (mandatory, Petrotechnical Data Center, LR2-1 DATA LOGGED WELL NAME X-10A 900 E. Benson Blvd. 3t26/2o1S M.K.BENDER (mandatory) Anchorage, Alaska 99508 FIELD Prudhoe Bay to acknowledge receipt of this data. (mandatory) COUNTY North Slope Borough LOG TYPE LWD-Coil (mandatory) (mandatory) STATE Alaska BH DISTRICT Alaska (mandatory) (mandatory) LOG DATE: March 6,2015 TO DAYS DATE: 19-Mar-15 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: Paula Lacey EMAIL: paula.lacev@bakerhughes.com (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? No COMPANY FIELD FINAL CD Final CD ADDRESS(FEDEX WILL NOTOELIVER TO P.O.Box) LOGS LOGS (digitalfimage) Surveys (Final Surveys) PERSON ATTENTION #OF PRINTS #OF PRINTS #OF COPIES #OF COPIES#OF COPIES 4 4 4 4 4 4 1 BP North SlopeI I 1 0 1 I EOA,PBOC,PRB-20(Office 109) 11 Attn:D&C Wells Project Aids Agatha Rutka&Barbara Glassmaker i 900 East Benson Boulevard Anchorage,AK,99519 2 ConocoPhillips Alaska Inc. I 0 1 1 1 I 1 I Attn:Ricky Elgaricio ATO 3-344 700 G Street Anchorage,AK 99510 3 ExxonMobil,Alaska 1 1 I 1 I 1 1 Attn:Lynda M.Yaskell and/or Leonardo Elias 3201 C Street,Suite 505 Anchorage,AK 99503 4 State of Alaska -AOGCC I 4 I 1 I 2 I 1 I Attn:Makana Bender 333 W.7th Ave.Suite 100 Anchorage,Alaska 99501 5 DNR-Division of Oil&Gas '** I 0 I 1 I 1 I 1 I Attn:Sean Clifton 550 West 7th Avenue,Suite 802 Anchorage,Alaska 99501 6 BP Exploration(Alaska)Inc. I I I 1 I 1 I I Petrotechnical Data Center,LR2-1 900 E.Benson Blvd. Anchorage,Alaska 99508 TOTALS FOR THIS PAGE: 0 3 4 6 4 0 TOTALS FOR ALL PAGES: 0 3 4 6 4 0 . 215004 25583 RECEIVED MAR 2 4 2015 bp AOGCC North America - ALASKA - BP Prudhoe Bay PB X Pad X-10 - Slot 10 500292046700 X-10A Design: X-10A Survey Report - Geographic 06 March, 2015 BAKER HUGHES 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: 12:10 7/6/1980 00:00©74.94usft(generic drilling rig) Site: PB X Pad MD Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) ' Well: X-10 North Reference: True Wellbore: X-10A Survey Calculation Method: Minimum Curvature Design: X-10A Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB X Pad,TR-10-14 Site Position: Northing: 5,937,417.970 usft Latitude: 70°14'7.207 N From: Map Easting: 664,667.650 usft Longitude: 148°40'13.706 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.25 ° Well X-10 API No. 500292046700 Well Position +N/-S 0.00 usft Northing: 5,939,642.993 usft Latitude: 70°14'28.925 N +E/-W 0.00 usft Easting: 665,417.001 usft Longitude: 148°39'50.513 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 38.87 usft Wellbore X-10A API no. 500292046701 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (0) (°) (nT) BGGM2014 3/1/2015 19.40 80.97 57,582 Design X-10A Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,600.00 Vertical Section: Depth From(TVD) +N/-S +El-W Direction (usft) (usft) (usft) (0) 36.94 0.00 0.00 150.84 Survey Program Date: 3/6/2015 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 10,600.00 1 :Sperry-Sun BOSS gyro multi(X-10) BOSS-GYRO Sperry-Sun BOSS gyro multishot 10,631.00 12,945.03 CoilTrak MWD(X-10A) MWD MWD-Standard 3/6/2015 12:33:13PM Page 2 COMPASS 5000.1 Build 61 ri 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site: PB X Pad MD Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Well: X-10 North Reference: True Wellbore: X-10A Survey Calculation Method: Minimum Curvature Design: X-10A Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-5 +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 36.94 0.00 0.00 36.94 0.00 0.00 5,939,642.993 665,417.001 70°14'28.925 N 148°39'50.513 W 100.00 0.33 158.61 100.00 -0.17 0.07 5,939,642.825 665,417.071 70°14'28.923 N 148°39'50.512 W 200.00 0.42 172.61 200.00 -0.80 0.22 5,939,642.197 665,417.237 70°14'28.917 N 148°39'50.507 W 300.00 0.37 171.11 300.00 -1.48 0.32 5,939,641.517 665,417.349 70°14'28.911 N 148°39'50.504 W 400.00 0.35 192.69 399.99 -2.10 0.30 5,939,640.900 665,417.345 70°14'28.904 N 148°39'50.505 W 500.00 0.43 158.70 499.99 -2.75 0.37 5,939,640.254 665,417.428 70°14'28.898 N 148°39'50.503 W 600.00 0.32 173.11 599.99 -3.37 0.54 5,939,639.631 665,417.612 70°14'28.892 N 148°39'50.498 W 700.00 0.42 179.81 699.99 -4.02 0.57 5,939,638.988 665,417.661 70°14'28.886 N 148°39'50.497 W 800.00 0.52 175.61 799.98 -4.84 0.61 5,939,638.170 665,417.714 70°14'28.878 N 148°39'50.496 W 900.00 0.50 153.90 899.98 -5.68 0.83 5,939,637.331 665,417.960 70°14'28.869 N 148°39'50.489 W 1,000.00 0.33 206.29 999.98 -6.33 0.90 5,939,636.683 665,418.038 70°14'28.863 N 148°39'50.487 W 1,100.00 0.47 211.29 1,099.97 -6.94 0.56 5,939,636.067 665,417.711 70°14'28.857 N 148°39'50.497 W 1,200.00 0.55 213.10 1,199.97 -7.69 0.08 5,939,635.304 665,417.253 70°14'28.849 N 148°39'50.511 W 1,300.00 0.35 168.61 1,299.97 -8.39 -0.12 5,939,634.599 665,417.066 70°14'28.843 N 148°39'50.517 W 1,400.00 0.35 201.60 1,399.97 -8.98 -0.17 5,939,634.014 665,417.027 70°14'28.837 N 148°39'50.518 W 1,500.00 0.22 172.31 1,499.96 -9.45 -0.26 5,939,633.538 665,416.951 70°14'28.832 N 148°39'50.521 W 1,600.00 0.53 88.19 1,599.96 -9.63 0.23 5,939,633.373 665,417.442 70°14'28.830 N 148°39'50.507 W 1,700.00 0.33 83.90 1,699.96 -9.58 0.98 5,939,633.435 665,418.190 70°14'28.831 N 148°39'50.485 W 1,800.00 0.45 95.20 1,799.96 -9.59 1.66 5,939,633.445 665,418.867 70°14'28.831 N 148°39'50.465 W 1,900.00 0.35 114.41 1,899.96 -9.75 2.33 5,939,633.298 665,419.540 70°14'28.829 N 148°39'50.446 W 2,000.00 0.78 113.50 1,999.95 -10.15 3.23 5,939,632.920 665,420.451 70°14'28.825 N 148°39'50.420 W 2,100.00 0.70 114.61 2,099.94 -10.67 4.41 5,939,632.420 665,421.641 70°14'28.820 N 148°39'50.385 W 2,200.00 0.42 140.00 2,199.94 -11.21 5.20 5,939,631.903 665,422.444 70°14'28.815 N 148°39'50.362 W 2,300.00 0.47 167.61 2,299.93 -11.89 5.52 5,939,631.229 665,422.782 70°14'28.808 N 148°39'50.353 W 2,400.00 0.73 143.50 2,399.93 -12.80 5.99 5,939,630.326 665,423.269 70°14'28.799 N 148°39'50.339 W 2,500.00 0.97 133.40 2,499.92 -13.90 6.98 5,939,629.255 665,424.287 70°14'28.788 N 148°39'50.310 W 2,600.00 0.62 150.40 2,599.91 -14.95 7.87 5,939,628.223 665,425.192 70°14'28.778 N 148°39'50.285 W 2,700.00 1.53 226.79 2,699.89 -16.33 7.16 5,939,626.823 665,424.516 70°14'28.764 N 148°39'50.305 W 2,800.00 2.58 170.70 2,799.84 -19.47 6.55 5,939,623.675 665,423.976 70°14'28.734 N 148°39'50.323 W 2,850.00 3.92 152.40 2,849.76 -22.09 7.52 5,939,621.072 665,425.007 70°14'28.708 N 148°39'50.295 W 2,900.00 6.47 136.70 2,899.55 -25.66 10.25 5,939,617.567 665,427.809 70°14'28.673 N 148°39'50.216 W 2,950.00 7.02 137.20 2,949.20 -29.95 14.26 5,939,613.364 665,431.910 70°14'28.631 N 148°39'50.099 W 3,000.00 7.42 137.11 2,998.81 -34.56 18.53 5,939,608.852 665,436.283 70°14'28.585 N 148°39'49.975 W 3,050.00 8.78 143.31 3,048.31 -39.98 23.01 5,939,603.526 665,440.878 70°14'28.532 N 148°39'49.845 W 3,100.00 10.83 150.11 3,097.58 -47.12 27.63 5,939,596.496 665,445.655 70°14'28.462 N 148°39'49.710 W 3,200.00 14.90 148.31 3,195.05 -66.21 39.07 5,939,577.660 665,457.511 70°14'28.274 N 148°39'49.378 W 3,300.00 16.77 147.61 3,291.25 -89.33 53.55 5,939,554.861 665,472.497 70°14'28.046 N 148°39'48.957 W 3,400.00 19.38 149.40 3,386.30 -115.80 69.73 5,939,528.757 665,489.249 70°14'27.786 N 148°39'48.486 W 3,500.00 22.20 149.70 3,479.78 -146.40 87.71 5,939,498.562 665,507.896 70°14'27.485 N 148°39'47.964 W 3,600.00 25.00 149.50 3,571.41 -180.93 107.97 5,939,464.492 665,528.908 70°14'27.146 N 148°39'47.375 W 3,700.00 26.68 150.31 3,661.41 -218.64 129.82 5,939,427.270 665,551.575 70°14'26.775 N 148°39'46.740 W 3,800.00 29.07 150.90 3,749.80 -259.37 152.76 5,939,387.050 665,575.399 70°14'26.374 N 148°39'46.073 W 3,900.00 32.43 150.50 3,835.73 -303.95 177.78 5,939,343.035 665,601.396 70°14'25.936 N 148°39'45.346 W 4,000.00 35.02 150.81 3,918.89 -352.35 204.98 5,939,295.252 665,629.651 70°14'25.460 N 148°39'44.555 W 4,100.00 38.87 150.90 3,998.80 -404.83 234.25 5,939,243.425 665,660.059 70°14'24.944 N 148°39'43.704 W 4,200.00 41.72 151.61 4,075.06 -461.53 265.34 5,939,187.423 665,692.381 70°14'24.386 N 148°39'42.801 W 4,300.00 42.10 151.81 4,149.48 -520.35 296.99 5,939,129.317 665,725.318 70°14'23.807 N 148°39'41.880 W 4,400.00 42.33 151.90 4,223.55 -579.60 328.69 5,939,070.785 665,758.303 70°14'23.225 N 148°39'40.959 W 4,500.00 41.72 152.50 4,297.83 -638.82 359.91 5,939,012.271 665,790.816 70°14'22.642 N 148°39'40.052 W 4,600.00 41.33 152.70 4,372.70 -697.67 390.42 5,938,954.102 665,822.607 70°14'22.063 N 148°39'39.165 W 4,700.00 41.65 152.90 4,447.61 -756.60 420.70 5,938,895.862 665,854.173 70°14'21.484 N 148°39'38.285 W 4,800.00 41.83 153.70 4,522.22 -816.07 450.61 5,938,837.061 665,885.381 70°14'20.899 N 148°39'37.416 W 4,900.00 42.18 154.31 4,596.53 -876.22 479.94 5,938,777.574 665,916.020 70°14'20.307 N 148°39'36.563 W 5,000.00 42.42 154.70 4,670.49 -936.97 508.91 5,938,717.480 665,946.312 70°14'19.710 N 148°39'35.721 W 5,100.00 42.35 155.20 4,744.36 -998.04 537.45 5,938,657.056 665,976.186 70°14'19.109 N 148°39'34.892 W 3/6/2015 12:33:13PM Page 3 COMPASS 5000.1 Build 61 0 by Survey Report-Geographic FA" BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site: PB X Pad MD Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Well: X-10 North Reference: True Wellbore: X-10A Survey Calculation Method: Minimum Curvature Design: X-10A Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical • Map Map Depth Inclination Azimuth Depth +NIS +E/-IN Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 5,200.00 42.32 156.00 4,818.28 -1,059.37 565.27 5,938,596.355 666,005.344 70°14'18.506 N 148°39'34.083 W 5,300.00 42.08 156.50 4,892.36 -1,120.85 592.33 5,938,535.485 666,033.738 70°14'17.901 N 148°39'33.297 W 5,400.00 42.18 157.11 4,966.52 -1,182.51 618.75 5,938,474.425 666,061.503 70°14'17.295 N 148°39'32.529 W 5,500.00 42.25 157.40 5,040.59 -1,244.48 644.73 5,938,413.048 666,088.833 70°14'16.685 N 148°39'31.774 W 5,600.00 42.65 157.50 5,114.37 -1,306.81 670.61 5,938,351.301 666,116.076 70°14'16.072 N 148°39'31.022 W 5,700.00 43.00 157.50 5,187.72 -1,369.61 696.62 5,938,289.090 666,143.459 70°14'15.455 N 148°39'30.266 W 5,800.00 43.15 157.61 5,260.76 -1,432.73 722.70 5,938,226.560 666,170.911 70°14'14.834 N 148°39'29.509 W 5,900.00 44.15 157.50 5,333.12 -1,496.53 749.05 5,938,163.362 666,198.656 70°14'14.206 N 148°39'28.743 W 6,000.00 44.75 157.61 5,404.50 -1,561.25 775.79 5,938,099.246 666,226.804 70°14'13.570 N 148°39'27.966 W 6,100.00 45.03 157.40 5,475.35 -1,626.46 802.79 5,938,034.653 666,255.229 70°14'12.928 N 148°39'27.181 W 6,200.00 45.45 157.11 5,545.76 -1,691.94 830.24 5,937,969.792 666,284.111 70°14'12.284 N 148°39'26.384 W 6,300.00 45.87 156.70 5,615.66 -1,757.73 858.30 5,937,904.640 666,313.601 70°14'11.637 N 148°39'25.568 W 6,400.00 45.83 156.50 5,685.31 -1,823.58 886.79 5,937,839.436 666,343.533 70°14'10.990 N 148°39'24.741 W 6,500.00 46.58 156.40 5,754.52 -1,889.75 915.63 5,937,773.919 666,373.816 70°14'10.339 N 148°39'23.903 W 6,600.00 47.08 156.50 5,822.93 -1,956.61 944.77 5,937,707.721 666,404.414 70°14'9.681 N 148°39'23.056 W 6,700.00 46.65 156.31 5,891.31 -2,023.48 973.98 5,937,641.509 666,435.081 70°14'9.024 N 148°39'22.207 W 6,800.00 47.05 156.50 5,959.70 -2,090.34 1,003.19 5,937,575.314 666,465.741 70°14'8.366 N 148°39'21.359 W 6,900.00 46.40 156.20 6,028.25 -2,157.03 1,032.39 5,937,509.283 666,496.401 70°14'7.710 N 148°39'20.510 W 7,000.00 46.28 156.31 6,097.28 -2,223.25 1,061.52 5,937,443.722 666,526.976 70°14'7.059 N 148°39'19.664 W 7,100.00 45.95 156.20 6,166.61 -2,289.22 1,090.54 5,937,378.407 666,557.436 70°14'6.410 N 148°39'18.821 W ' 7,200.00 45.77 155.81 6,236.25 -2,354.79 1,119.73 5,937,313.506 666,588.048 70°14'5.765 N 148°39'17.973 W 7,300.00 46.50 156.31 6,305.54 -2,420.68 1,148.98 5,937,248.273 666,618.738 70°14'5.117 N 148°39'17.123 W 7,400.00 45.12 155.81 6,375.25 -2,486.21 1,178.07 5,937,183.397 666,649.259 70°14'4.472 N 148°39'16.278 W 7,500.00 44.52 155.61 6,446.18 -2,550.46 1,207.07 5,937,119.805 666,679.654 70°14'3.840 N 148°39'15.436 W 7,600.00 44.33 155.40 6,517.59 -2,614.16 1,236.09 5,937,056.764 666,710.065 70°14'3.214 N 148°39'14.593 W 7,700.00 44.00 154.90 6,589.33 -2,677.38 1,265.37 5,936,994.205 666,740.721 70°14'2.592 N 148°39'13.742 W 7,800.00 43.45 154.40 6,661.59 -2,739.85 1,294.96 5,936,932.409 666,771.674 70°14'1.978 N 148°39'12.883 W 7,900.00 42.90 154.20 6,734.52 -2,801.50 1,324.63 5,936,871.425 666,802.690 70°14'1.371 N 148°39'12.021 W 8,000.00 41.95 153.70 6,808.34 -2,862.11 1,354.25 5,936,811.485 666,833.634 70°14'0.775 N 148°39'11.160 W 8,100.00 41.42 153.40 6,883.02 -2,921.65 1,383.87 5,936,752.611 666,864.552 70°14'0.189 N 148°39'10.300 W 8,200.00 40.55 153.70 6,958.51 -2,980.37 1,413.09 5,936,694.551 666,895.045 70°13'59.612 N 148°39'9.451 W 8,300.00 39.70 153.11 7,034.97 -3,038.00 1,441.94 5,936,637.574 666,925.149 70°13'59.045 N 148°39'8.613 W 8,400.00 39.00 153.20 7,112.30 -3,094.57 1,470.57 5,936,581.648 666,955.014 70°13'58.489 N 148°39'7.781 W 8,500.00 38.63 152.61 7,190.21 -3,150.37 1,499.12 5,936,526.490 666,984.777 70°13'57.940 N 148°39'6.952 W 8,600.00 37.55 152.61 7,268.92 -3,205.14 1,527.50 5,936,472.356 667,014.350 70°13'57.401 N 148°39'6.128 W 8,700.00 36.58 155.81 7,348.72 -3,259.39 1,553.73 5,936,418.705 667,041.764 70°13'56.867 N 148°39'5.366 W 8,800.00 34.75 161.90 7,429.99 -3,313.68 1,574.80 5,936,364.892 667,064.021 70°13'56.333 N 148°39'4.754 W 8,900.00 34.45 163.31 7,512.30 -3,367.86 1,591.78 5,936,311.098 667,082.182 70°13'55.800 N 148°39'4.261 W 9,000.00 33.68 164.50 7,595.14 -3,421.68 1,607.31 5,936,257.642 667,098.892 70°13'55.271 N 148°39'3.810 W 9,100.00 33.45 165.50 7,678.47 -3,475.08 1,621.62 5,936,204.570 667,114.370 70°13'54.746 N 148°39'3.395 W 9,200.00 32.28 167.81 7,762.47 -3,527.87 1,634.16 5,936,152.074 667,128.064 70°13'54.227 N 148°39'3.031 W 9,300.00 32.65 166.90 7,846.84 -3,580.24 1,645.91 5,936,099.974 667,140.962 70°13'53.712 N 148°39'2.689 W 9,400.00 32.62 167.20 7,931.05 -3,632.80 1,658.00 5,936,047.699 667,154.197 70°13'53.195 N 148°39'2.339 W 9,500.00 32.93 168.11 8,015.13 -3,685.68 1,669.57 5,935,995.087 667,166.925 70°13'52.675 N 148°39'2.003 W 9,600.00 34.22 169.70 8,098.45 -3,739.95 1,680.20 5,935,941.071 667,178.741 70°13'52.141 N 148°39'1.694 W 9,700.00 35.52 171.31 8,180.49 -3,796.33 1,689.62 5,935,884.910 667,189.393 70°13'51.586 N 148°39'1.421 W 9,800.00 38.20 173.11 8,260.50 -3,855.76 1,697.72 5,935,825.681 667,198.794 70°13'51.002 N 148°39'1.186 W 9,900.00 36.37 175.11 8,340.06 -3,916.00 1,703.95 5,935,765.590 667,206.352 70°13'50.409 N 148°39'1.005 W 10,000.00 37.40 177.90 8,420.05 -3,975.90 1,707.60 5,935,705.792 667,211.305 70°13'49.820 N 148°39'0.900 W 10,100.00 38.05 180.39 8,499.15 -4,037.07 1,708.50 5,935,644.661 667,213.550 70°13'49.219 N 148°39'0.874 W 10,200.00 38.95 182.39 8,577.41 -4,099.29 1,706.98 5,935,582.422 667,213.396 70°13'48.607 N 148°39'0.918 W 10,300.00 40.08 184.79 8,654.56 -4,162.79 1,702.98 5,935,518.863 667,210.791 70°13'47.982 N 148°39'1.035 W 10,400.00 40.90 186.89 8,730.62 -4,227.37 1,696.36 5,935,454.153 667,205.594 70°13'47.347 N 148°39'1.228 W 10,500.00 42.13 190.69 8,805.50 -4,292.84 1,686.21 5,935,388.478 667,196.883 70°13'46.703 N 148°39'1.523 W 10,550.00 39.72 195.29 8,843.29 -4,324.74 1,678.88 5,835,356.425 667,190.258 70°13'46.389 N 148°39'1.736 W 3/6/2015 12.33.13PM Page 4 COMPASS 5000.1 Build 61 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site: PB X Pad MD Reference: 12:10 7/6/1980 00:00©74.94usft(generic drilling rig) Well: X-10 North Reference: True Wellbore: X-10A Survey Calculation Method: Minimum Curvature Design: X-10A Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-S +EI-W Northing Easting (usft) (°) (<) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 10,600.00 37.77 199.50 8,882.29 -4,354.60 1,669.56 5,935,326.377 667,181.590 70°13'46.096 N 148°39'2.007 W TIP 10,631.00 37.16 199.53 8,906.90 -4,372.37 1,663.26 5,935,308.471 667,175.682 70°13'45.921 N 148°39'2.190 W KOP 10,660.36 38.63 198.32 8,930.07 -4,389.43 1,657.41 5,935,291.290 667,170.213 70°13'45.753 N 148°39'2.360 W Interpolated Azimuth 10,693.68 42.26 197.16 8,955.42 -4,410.01 1,650.84 5,935,270.566 667,164.090 70°13'45.551 N 148°39'2.552 W Interpolated Azimuth 10,723.80 46.12 196.27 8,977.01 -4,430.12 1,644.80 5,935,250.335 667,158.501 70°13'45.353 N 148°39'2.727 W Interpolated Azimuth 10,754.12 51.49 195.47 8,996.97 -4,452.06 1,638.57 5,935,228.266 667,152.754 70°13'45.137 N 148°39'2.908 W Interpolated Azimuth 10,784.05 56.90 194.76 9,014.48 -4,475.48 1,632.25 5,935,204.709 667,146.948 70°13'44.907 N 148°39'3.092 W Interpolated Azimuth 10,813.74 62.94 194.12 9,029.35 -4,500.35 1,625.85 5,935,179.707 667,141.096 70°13'44.662 N 148°39'3.278 W 10,813.75 62.94 194.12 9,029.36 -4,500.36 1,625.85 5,935,179.698 667,141.094 70°13'44.662 N 148°39'3.278 W 10,846.50 69.99 194.95 9,042.43 -4,529.41 1,618.31 5,935,150.497 667,134.198 70°13'44.377 N 148°39'3.497 W 1 10,873.72 75.14 194.19 9,050.58 -4,554.53 1,611.79 5,935,125.235 667,128.223 70°13'44.130 N 148°39'3.687 W 10,904.92 80.34 192.61 9,057.20 -4,584.18 1,604.73 5,935,095.441 667,121.816 70°13'43.838 N 148°39'3.892 W 10,936.12 85.61 194.58 9,061.02 -4,614.27 1,597.45 5,935,065.206 667,115.200 70°13'43.542 N 148°39'4.104 W 10,963.66 91.17 196.67 9,061.79 -4,640.77 1,590.04 5,935,038.552 667,108.372 70°13'43.281 N 148°39'4.319 W 10,993.58 96.33 196.22 9,059.83 -4,669.39 1,581.59 5,935,009.750 667,100.553 70°13'43.000 N 148°39'4.565 W 11,023.64 102.49 195.55 9,054.92 -4,697.90 1,573.47 5,934,981.072 667,093.067 70°13'42.720 N 148°39'4.801 W 11,061.73 106.34 192.65 9,045.44 -4,733.67 1,564.48 5,934,945.120 667,084.862 70°13'42.368 N 148°39'5.062 W 11,090.67 106.28 188.68 9,037.31 -4,760.98 1,559.34 5,934,917.726 667,080.323 70°13'42.099 N 148°39'5.212 W 11,120.67 106.03 186.23 9,028.96 -4,789.53 1,555.60 5,934,889.084 667,077.213 70°13'41.818 N 148°39'5.321 W 11,150.88 105.00 183.31 9,020.88 -4,818.53 1,553.19 5,934,860.035 667,075.432 70°13'41.533 N 148°39'5.391 W 11,180.63 102.49 180.31 9,013.81 -4,847.41 1,552.28 5,934,831.146 667,075.157 70°13'41.249 N 148°39'5.418 W 11,210.83 100.03 179.14 9,007.91 -4,877.02 1,552.42 5,934,801.543 667,075.951 70°13'40.958 N 148°39'5.414 W 11,240.81 97.54 179.22 9,003.33 -4,906.65 1,552.84 5,934,771.939 667,077.024 70°13'40.667 N 148°39'5.401 W 11,270.83 95.01 180.81 9,000.05 -4,936.48 1,552.84 5,934,742.111 667,077.670 70°13'40.373 N 148°39'5.402 W 11,301.23 92.80 178.66 8,997.98 -4,966.81 1,552.98 5,934,711.798 667,078.477 70°13'40.075 N 148°39'5.398 W 11,331.22 92.80 175.02 8,996.52 -4,996.71 1,554.63 5,934,681.940 667,080.783 70°13'39.781 N 148°39'5.350 W 11,361.25 92.70 171.80 8,995.08 -5,026.51 1,558.07 5,934,652.231 667,084.878 70°13'39.488 N 148°39'5.250 W 11,391.22 91.26 170.88 8,994.04 -5,056.11 1,562.58 5,934,622.730 667,090.036 70°13'39.197 N 148°39'5.120 W 11,421.33 89.69 167.10 8,993.79 -5,085.66 1,568.33 5,934,593.317 667,096.432 70°13'38.906 N 148°39'4.953 W 11,451.20 90.18 163.48 8,993.82 -5,114.55 1,575.91 5,934,564.606 667,104.647 70°13'38.622 N 148°39'4.733 W 11,480.94 90.43 160.25 8,993.67 -5,142.81 1,585.17 5,934,536.559 667,114.519 70°13'38.344 N 148°39'4.464 W 11,510.79 90.46 157.23 8,993.43 -5,170.62 1,595.99 5,934,508.991 667,125.948 70°13'38.070 N 148°39'4.150 W 11,541.23 90.52 154.14 8,993.17 -5,198.36 1,608.52 5,934,481.539 667,139.085 70°13'37.798 N 148°39'3.786 W 11,570.92 89.45 151.31 8,993.18 -5,224.74 1,622.12 5,934,455.460 667,153.264 70°13'37.538 N 148°39'3.391 W 11,601.17 88.89 148.00 8,993.62 -5,250.84 1,637.40 5,934,429.704 667,169.110 70°13'37.281 N 148°39'2.947 W 11,630.55 89.85 144.48 8,993.94 -5,275.26 1,653.73 5,934,405.649 667,185.964 70°13'37.041 N 148°39'2.473 W 11,661.42 89.85 140.48 8,994.02 -5,299.74 1,672.52 5,934,381.590 667,205.293 70°13'36.800 N 148°39'1.927 W 11,690.95 90.74 138.09 8,993.87 -5,322.12 1,691.78 5,934,359.639 667,225.038 70°13'36.580 N 148°39'1.368 W 11,720.86 89.26 133.53 8,993.87 -5,343.56 1,712.63 5,934,338.663 667,246.345 70°13'36.369 N 148°39'0.762 W 11,750.92 89.29 129.26 8,994.25 -5,363.43 1,735.17 5,934,319.293 667,269.317 70°13'36.174 N 148°39'0.108 W 11,777.19 89.17 124.63 8,994.61 -5,379.22 1,756.16 5,934,303.975 667,290.644 70°13'36.018 N 148°38'59.498 W 11,810.37 90.18 120.23 8,994.79 -5,397.01 1,784.16 5,934,286.806 667,319.024 70°13'35.843 N 148°38'58.685 W 11,840.15 90.06 115.34 8,994.73 -5,410.88 1,810.49 5,934,273.510 667,345.658 70°13'35.707 N 148°38'57.920 W 11,871.32 89.32 109.88 8,994.90 -5,422.86 1,839.26 5,934,262.166 667,374.675 70°13'35.589 N 148°38'57.084 W 11,906.02 89.75 105.54 8,995.18 -5,433.42 1,872.30 5,934,252.342 667,407.943 70°13'35.485 N 148°38'56.125 W 11,933.50 91.04 102.06 8,994.99 -5,439.97 1,898.98 5,934,246.376 667,434.760 70°13'35.421 N 148°38'55.350 W 11,961.32 92.15 98.78 8,994.22 -5,445.00 1,926.33 5,934,241.948 667,462.208 70°13'35.371 N 148°38'54.555 W 3/6/2015 12:33:13PM Page 5 COMPASS 5000.1 Build 61 � 4 FA/ 0 bp Survey Report-Geographic RAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site: PB X Pad MD Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Well: X-10 North Reference: True Wellbore: X-10A Survey Calculation Method: Minimum Curvature Design: X-10A Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +Nf-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 11,992.14 92.12 94.92 8,993.07 -5,448.67 1,956.90 5,934,238.948 667,492.852 70°13'35.335 N 148°38'53.667 W 12,020.08 93.53 91.06 8,991.69 -5,450.13 1,984.77 5,934,238.104 667,520.738 70°13'35.320 N 148°38'52.858 W 12,052.22 93.02 85.82 8,989.85 -5,449.25 2,016.83 5,934,239.680 667,552.773 70°13'35.329 N 148°38'51.926 W 12,080.24 90.58 81.83 8,988.97 -5,446.24 2,044.67 5,934,243.303 667,580.534 70°13'35.359 N 148°38'51.118 W 12,110.69 88.80 78.41 8,989.14 -5,441.02 2,074.66 5,934,249.183 667,610.402 70°13'35.410 N 148°38'50.246 W 12,140.38 86.83 74.36 8,990.27 -5,434.04 2,103.49 5,934,256.794 667,639.068 70°13'35.478 N 148°38'49.409 W 12,170.38 88.56 69.14 8,991.48 -5,424.65 2,131.94 5,934,266.800 667,667.310 70°13'35.571 N 148°38'48.582 W 12,200.33 86.74 65.79 8,992.71 -5,413.19 2,159.58 5,934,278.869 667,694.685 70°13'35.683 N 148°38'47.779 W 12,230.58 87.94 61.38 8,994.11 -5,399.75 2,186.63 5,934,292.898 667,721.436 70°13'35.815 N 148°38'46.993 W 12,260.72 87.88 56.13 8,995.21 -5,384.13 2,212.37 5,934,309.076 667,746.828 70°13'35.969 N 148°38'46.245 W 12,290.74 88.68 53.34 8,996.11 -5,366.80 2,236.87 5,934,326.931 667,770.938 70°13'36.139 N 148°38'45.534 W 12,315.63 90.06 51.43 8,996.39 -5,351.62 2,256.59 5,934,342.549 667,790.312 70°13'36.289 N 148°38'44.961 W 12,347.48 89.94 47.45 8,996.39 -5,330.91 2,280.78 5,934,363.779 667,814.042 70°13'36.492 N 148°38'44.258 W 12,378.12 92.67 42.89 8,995.69 -5,309.32 2,302.49 5,934,385.836 667,835.279 70°13'36.704 N 148°38'43.627 W 12,404.89 93.13 39.46 8,994.33 -5,289.20 2,320.09 5,934,406.337 667,852.431 70°13'36.902 N 148°38'43.115 W 12,436.51 92.95 34.92 8,992.66 -5,264.05 2,339.18 5,934,431.896 667,870.954 70°13'37.150 N 148°38'42.561 W 12,465.66 90.98 29.73 8,991.66 -5,239.44 2,354.75 5,934,456.839 667,885.981 70°13'37.392 N 148°38'42.108 W 12,495.63 92.30 25.62 8,990.80 -5,212.92 2,368.66 5,934,483.660 667,899.306 70°13'37.652 N 148°38'41.704 W 12,526.49 92.42 20.60 8,989.53 -5,184.57 2,380.76 5,934,512.267 667,910.778 70°13'37.931 N 148°38'41.352 W 12,558.46 92.33 16.08 8,988.20 -5,154.26 2,390.80 5,934,542.790 667,920.158 70°13'38.229 N 148°38'41.060 W 12,586.98 90.67 11.61 8,987.45 -5,126.58 2,397.62 5,934,570.605 667,926.369 70°13'38.501 N 148°38'40.862 W 12,618.00 91.72 16.54 8,986.81 -5,096.51 2,405.16 5,934,600.834 667,933.246 70°13'38.797 N 148°38'40.642 W 12,648.70 91.04 20.41 8,986.07 -5,067.41 2,414.89 5,934,630.142 667,942.328 70°13'39.083 N 148°38'40.360 W 12,682.31 91.62 25.12 8,985.29 -5,036.43 2,427.89 5,934,661.392 667,954.643 70°13'39.388 N 148°38'39.982 W 12,705.79 91.47 28.54 8,984.65 -5,015.49 2,438.48 5,934,682.559 667,964.772 70°13'39.594 N 148°38'39.674 W 12,735.71 91.63 33.14 8,983.84 -4,989.82 2,453.81 5,934,708.561 667,979.533 70°13'39.846 N 148°38'39.228 W 12,764.23 90.98 36.90 8,983.19 -4,966.47 2,470.17 5,934,732.259 667,995.375 70°13'40.076 N 148°38'38.753 W 12,801.75 89.82 43.43 8,982.93 -4,937.82 2,494.35 5,934,761.436 668,018.925 70°13'40.358 N 148°38'38.050 W 12,825.25 88.80 42.25 8,983.21 -4,920.5#1; 2,510.33 5,934,779.011 668,034.519 70°13'40.527 N 148°38'37.586 W 12,854.05 88.99 51.06 8,983.77 -4,900.84 2,531.25 5,934,799.209 668,054.999 70°13'40.721 N 148°38'36.978 W 12,887.45 89.45 55.38 8,984.23 -4,880.85 2,557.99 5,934,819.781 668,081.295 70°13'40.918 N 148°38'36.201 W 12,915.03 91.54 59.73 8,983.99 -4,866.06 2,581.26 5,934,835.078 668,104.230 70°13'41.063 N 148°38'35.525 W 12,945.03 90.03 63.60 8,983.58 -4,851.82 2,607.66 5,934,849.887 668,130.307 70°13'41.203 N 148°38'34.758 W 13,032.00 90.03 63.60 8,983.53 -4,813.16 2,685.56 5,934,890.254 668,207.334 70°13'41.583 N 148°38'32.494 W Projection to TD 3/6/2015 12:33:13PM Page 6 COMPASS 5000.1 Build 61 V OF Tk4, \��X��jy s� THE STATE Alaska Oil and Gas �•-s 0., of I( /� Conservation Commission - == ALAS .n 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 *;. 907 279.1433 OA, ALASY+P Main:Fax. 907.276 7542 www.aogcc.alaska.gov John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. Post Office Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU X-10A BP Exploration (Alaska), Inc. Permit No: 215-004 Surface Location: 475' FNL, 479' FEL, Sec. 07, T1ON, R14E, UM Bottomhole Location: 5009' FNL, 2484' FWL, Sec. 08, T1ON, R14E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy '. Foerster Chair DATED this day of January , 2015. RECEDED STATE OF ALASKA ALA OIL AND GAS CONSERVATION COMA ON JAN 0 7 2015 PERMIT TO DRILL AOGCC { 20 AAC 25.005 la Type of work. 1 b.Proposed Well Class: 0 Development Oil 0 Service-Winj ®Single Zone • 1c.Specify if well is proposed for: 0 Drill 0 Lateral 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 Coalbed Gas 0 Gas Hydrates • 0 Redrill 0 Reentry 0 Exploratory 0 Service-WAG 0 Service-Disp 0 Geothermal 0 Shale Gas 2.Operator Name: 5. Bond 0 Blanket 0 Single Well 11.Well Name and Number: BP Exploration(Alaska) Inc. Bond No 6194193 - PBU X-10A • 3 Address 6.Proposed Depth: 12.Field/Pool(s) P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 13490' • TVD 8997'ss ' Prudhoe Bay/Prudhoe Bay 4a Location of Well(Governmental Section). 7.Property Designation(Lease Number): Surface. ADL 028313 /-3.1>i_ yW7( 475'FNL,479' FEL, Sec.07,T1ON, R14E, UM • Top of Productive Horizon 8.Land Use Permit: i 13.Approximate Spud Date. `' February FNL, 1153'FWL, Sec.08,T1ON, R14E, UM Fery 1,2015 Total Depth 9.Acres in Property. 14.Distance to Nearest Property: 5009'FNL,2484'FWL, Sec. 08,T1ON, R14E, UM 2501 10000' 4b Location of Well(State Base Plane Coordinates-NAD 27)• 10.KB Elevation above MSL: 74.94' • feet 15 Distance to Nearest Well Open Surface: x 665417 ' y-5939643 • Zone- ASP4 GL Elevation above MSL: 38.87' , feet to Same Pool: 750' 16.Deviated Wells: Kickoff Depth: 10716' feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 104 degrees Downhole: 24-1'73 4 GS Surface: 348-11 2535 , L L- 18. Casing Program Specifications Top-Sng Depth-Bottom Quantity of Cement,c.f.or sac s Hole Casing Weight Grade Coupling Length MD ` ND MD ND (including stage data) 4-1/4" 3-1/2"x 2-7/8" 6.6#/6.5# 13Cr85 STL 3524' 9945' 8301'ss 13469' 8997'ss 247 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth ND(ft): Plugs(measured). Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured) 11555' 9668' None 11497' 9619' 10808' Casing Length Size Cement Volume MD ND Conductor/Structural , 80' 20"x 30" 8.6 cu yds Arcticset - 34'- 114' 34'- 114' Surface 2643' 13-3/8" 3813 cu ft Permafrost II - 34'-2677' 34'-2677' Intermediate 8731' 9-5/8" 1521 cu ft Class'G', 130 cu ft Permafrost C 1702'-10433' 1702'-8755' Production Liner 1637' 7" 480 cu ft Class'G' _ 9918'-11555' 8355'-9668' Scab Liner 9883' 7" 1929 sx Class'G' 35'-9918' 35'-8355' Perforation Depth MD(ft): 10714'- 10740' Perforation Depth ND(ft): 8974'-8995' 20.Attachments: ❑Property Plat ®BOP Sketch 0 Drilling Program 0 Time vs Depth Plot ❑Shallow Hazard Analysis 0 Diverter Sketch 0 Seabed Report 0 Drilling Fluid Program 0 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date 22.I hereby certify that the foregoing is true and correct: Contact Travis Boltz,564-5750 Printed Name , r Title Engineering Team Leader Email Travis.Boltr@bp.com J �:d►' Signatu Lir , Phone 564-4711 Date /� Commission Use Only //7 Permit To D rill �; 1_ /API Number: Permit Approval Date: See cover letter for Number. C 50-029-20467-01-00 f —2?j --/ 5 , other requirements: Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas 1117 contained shales: L,,,,:ltC•5 t 'tG 3 5 OL' p 5 � Samples Req'd• ❑Yes 12/No Mud Log Req'd: ❑Yes [ Other: No ,,-// ,7L-/C r r�I-C L ri 7 h-i - -' I i o —2 G C1.25/ H2S Measures: [ 'Yes 0/N o Directional Survey Req'd: [' Yes 0 No Spacing exception req'd: 0 Yes ®No inclination-only svy Req'd: 0 Yes [(No V . - APPROVED BY / 2-3 /-5 APPROVED BY /� I SI NER THE COMMISSION Date ( — Form 10-401 Revised 10/2 12 TF�s� • ii l J(d42 nths from the date of approval(20 AAC 25.005 )) Submit Form and Attephments In Duplicate VTI— //7 01/5— NA/-,2,3-/3 1r .._1L AS, To: Alaska Oil & Gas Conservation Commission From: Travis Boltz bID CTD Engineer Date: January 5, 2015 Re: X-10A Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack from well X-10A using Nordic 1 to a target in lvishak Zone 4B. Rig Work (scheduled to begin February 1st, 2015) 1. MIRU and test BOPE 250 psi low and 3,500 psi high. (2461 psi MASP). 4. Mill 3.80" window and 10' of rathole. 5. Drill Build section: 4.25" OH, -240' (30° deg/100 planned) Drill Lateral section: 4.25" OH, 2438' (12° deg/100 planned) 6. Run 3-1/2" x 2-7/8" 13Cr-85 liner leaving TOL at -9,945' MD. Pump primary cement leaving TOC at TOL, -9,945' MD, 51 bbls of 15.8 ppg liner 7. cement planned. * 8. Perform liner cleanout with mill, motor and GR/CCL log. 9. Perform liner lap test to 2,400 psi 10. Perforate liner based on log interpretation 11. Contingent setting LTP (if liner lap test fails) * 12. Freeze protect well to 2500' MD 13. Set TWC, RDMO *Approved alternate plug placement per 20 AAC 25.112(i) Post-Rig Work: 1. Re-install wellhouse, flowline and pull BPV. 2. Set GLV's 3. Set liner top packer with slickline* if liner lap test fails. Mud Program: • Milling/drilling: 8.6 ppg PowerVis for milling window and drilling (594 psi over-balance). Disposal: • All Class I & II non-hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >11 must go to GNI. Hole Size: 5.1c • 4.25" From 10,716' MD to 13 9 MD Liner Program: • 3-1/2", 6.6 lb/ft, 13Cr-85, STL Solid liner 9,945' MD-10,716' MD • 2-7/8", 6.5 lb/ft, 13Cr-85, STL Solid liner 10,716' MD — 13,469' MD. • A minimum of 51 bbls of 15.8 ppg cement will be used for liner cementing. (TOC 9945' MD). • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional: • See attached directional plan. Maximum planned hole angle is 103°, inclination at kick off point is 36° • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property — 10,000'. • Distance to nearest well within pool — 750'. Logging: • MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section. • Cased hole GR/CCL logs will be run. Perforating: • PJ HMX 1.56", 4 spf, perf guns, 1" CSH work string, & 2-1/16" PH6 • The primary barrier for this operation: a minimum EMW of 8.6 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti-Collision Failures: • X-09B w,'Il be 51 avid /oc% � ! 1-`1 `-./-1"' z"" `'1, dvillrn'2 Hazards: / • X pad is considered a H2S pad. Well X-02 had 124 ppm H2S on 9/11/2014. • Most recent H2S level on X-02 is 124 ppm recorded on 9/11/2014. • The lost circulation risk in X-10A is considered to be medium, with 1 fault crossing - Reservoir Pressure: • The reservoir pressure on X-10A expected to be 3341 psi at 8800' TVDSS. (7.3 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,461 psi. • An EMW of 8.6 ppg for this well will provide 594 psi over-balance to the reservoir. Travis Boltz CC: Well File CTD Engineer Joseph Lastufka Loepp, Victoria T (DOA) From: Loepp,Victoria T(DOA) Sent: Tuesday,January 20, 2015 9:46 AM To: 'Boltz,Travis' Cc: Lastufka,Joseph N Subject: RE: PBU X-10A(PTD 215-004) Max Reservoir Pressure This email will suffice. However, the maximum reservoir pressure and datum needs to be reported in the future on the CTD 401s as well as the MPSP calculated. Please communicate this within your organization. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W 7th Ave, Ste 100 Anchorage,AK 99501 Work (907)793-1247 Victoria Loeppalaska qov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.Loepp©alaska.gov From: Boltz,Travis [mailto:Travis.Boltz(abp.com] Sent:Thursday,January 15, 2015 3:46 PM To: Loepp, Victoria T(DOA) Cc: Lastufka, Joseph N Subject: RE: PBU X-10A(PTD 215-004) Max Reservoir Pressure Victoria, You are correct. My TD of 8,997'TVDss would result in a different MASP. 8,997'*(0.052)*7.3ppg= 3415 psi 3415-(0.1psi/ft*8997')=2535psi In my calculations for permits, I used a base reference datum of 8800'TVDss. Will this email suffice for documentation or do you require additional documentation? Thank you. Respectfully, Travis Boltz Coiled Tubing Drilling Engineer Cell:502-640-1645 Office:907-564-5750 1 • W alljegZW w `tgo a= W m E1 z 0- CO CO t a 0 J O. Q W I W 0 _ .— L W MO O m E a Qa+ O> .- �a .—OO „Ti _ i = aN4 x V 2 c c� Z a` a >t >C a CO o ,-- 1111 'Aco = a `Wb z3 ,z u m �i"J - 1's n N R7 n d= a m Nr� �, °' 0co 0 m E. N f� N N u7 CO � co Z co 4O '- -,9), 3 a o) 4 Q v O o 0 o a a w O a a) O O 7 Y N U )o a)6 co Z Q >N U al O a) C17 cu se ca N o > Xao 3a rn5 rn ci J — m a) •� c aa) 0) C.) ei 3 a C) 3 N C .0 C a r C 2 V- - uW N.N c7) a O X01 m 0> >J J 0 3 O0 0 a • ' V c = O1 V c '2 t CO w d ti N Lo c m o �p _C 'a cmi.a i to- a c a °' « a o ` 4) 075 , 0 c cv 15 m o O 0 w76- IX dm U mmN Nc 0 0 m IX >, E > > c otm .o « 1-- 00 0 • r. V O � p r O NNN aV J I- o N 0 ° rZU) 0 a' CO 0, 0 1-- o � v rn4 °) p Cc) CD COO 1? ari O Cr m a) m O COCY O C CO COco tri Q:.. m d Ho c 5 'c >o 0 3 E o A N O U N F `} O Cl_ =I m NCV 7 m c O 10 .O a co C C •0 O .- C L Iii C Z W N C m -z LaC o a) Z N o z I g a QLo m m 0 W tO O= o• o o 41 N N o =3 a 10 a' y� E a o N am N Z O 4= b= N LL ? C`7 o WU X > I Z a' j �O o 0 o r d m NO H 0 0 0 0 1 o 0 gm °�U o 0 o m o a Q r cQ o a c i 1a CO Q -o a. c X o o Z C09 0 m m `-- co O a O N N 1 a 0 X X a X m a a Ta rn ° 1a 3 0 Q o d �o w i m Z1i _c -c DZ Q + + z.' o 2 m c c 1 ZaaXXX 't c co m c m Q • c c ° c if; m N m •E m ° m D N m C N m O 0 A .. — O C +" T 10 O O O O r O y c ? O a) an a 6 . a o m Cr) O N a « a a c as 0 a «d il a) .O 0 0 0 « .° O o d . NO d 100 d 7 d d N c.) arn33o a 2CD2 N fALLa 3 3 a 3 2 o a > > . IA - --� 0 0 0 0 0 0 0 CO 0 CO CO 0 N CO W •_ 0 N 0 O O 0 0 O N 0 V 0) Oa ` MedZ = 0 0 0 0 0 0 0 C 4 Ln of o) o) \a o $ v 0) CIrn COa0 w ro 41 111111bg 0 � o mo m Ew- aa) H V o Z °' cp CO Q 0 ) a) 0 N N- u co co CO auo, CO aoo, (o coo CD rn a c r` Di m y CO Ln v 0) Ni 7) r) 0 () N COM sr co N (O 0) () O) N CO M L) O O O O N N N M M' Nr Ln cn CO 0 ON ' N• N N N N N N N ( N N N c N ci U O a' 7 O O O a) CO ▪ O O T.) O cp ti Cn J 0 7 Q O up O O O O O O O O O O O O O O' O CO U . O O O M co6 M N N N N N N N N a) E Ln E ‘-.- 7 u) 0 o W y 3 � c cio 322 � t- gw d co V O a0 O CO co U) co a) s- r U ii N- co h n N co Ln � CO LO Oi O CD I- 4 (6 VaCO O 0 _L o cn ,- ,- ,- ,- O O O O O O O O O a) C .' o r r r` r` N- n r` ti C` n r--- Ti n N- CDN: re f — N co CO CO CO CO CO CO CO CO O CO CO CO CO CO C ro p CO CO CO CO CO CO CO CO CO O CO CO CO CO CO i a) $ L W V ,• V cO C .O C O 7 �' C .- v E co co co V Ln N r` 0) O h CO 0) N cc 4 E �m ism O v In N CO CO CO CI) v, a) r r` r� CO cq O .e . 0 a) O a) 4 Ln Ln N N 7 O) M 0) O CO U d OTi CO CO co nr O s- O CO N 0) M CO N- CO V To ^�ce Z d C N 1.6 N 10. N 1.7 N O O O O co r r CO Ln v C 0t u)1 (1) 'O t N M co co co co M coocc co1.6 amC'▪) M M M M M J F'� 2 f3 O o. a) 0) a) a) CD 0) o) o) 0) o o) o) a) o) o) C m C 2 U) U) Lri Lc Lo Ln Lri U) Lri Ln in Ln Ln tri Ln i p C m a a _ '� O N. co 0) in O Ln O 0 M CO CO N N ✓ r O co cocon O) O n CO N N CO W co >> COn O N-LO V O) O 0) a) O CD oO CO N.> sr sr sr N 0) a) N- CO CO CD r CO N 0) O C.0M CO CO CO : : : cnLnLn : ; : : : : Or L17 VO OO O n co M M £ O co (O n O in cocci • Cr) 0 co _co a1 co O sr sr Ln U) Co CO CO CO O) Q) C6 G O co 0 v 'T v f v v v v v v v v v Lc Ln a Ho m m a) ca o co CO CO 0 N- CO O 10 CO v N- 0 M M mr CO Ln CO Ln r` CO 0) In N: O co 0) O O Ln Ln co M O O Ln co X co O Ln a) a) co n CO U 1- M co CO N (q_ CO a) a) 0) 0) O) a) a) a) 0 a) a) 0) 0) a) In.4" co- co- Lb CO a0 aO 00 00 00 CD a0 a0 cc U) o 3 0 w E T O) co " O O) O) O) O O) O) N M CO M N N co (D V V V V O) M ▪ N 0 0 0 e O — ai ai O a) ai ci ai O) N 4 O co o o m X a) a) a) a) a) a) a) O O O a) co co co Lo d C N N N a =m (9 o 7 L� '- co to 3 Z a o T > co N t CA o 7 0 O 0 0 0 0 U O CO CO Ln 0) 0) Q N X COCOCO0 COo m o v, c) co h CO rn Ln 10 N- c0 c0 O c) a) co 0 L[) (C R 0 0 co co CO Ln CO 0) 0 0 0 O 0) Q) 0) a) O U T N 0 O O ,- s- .- ,- ▪ c6 O O O C,).-. � m p N h C°„ Q o a ~ o co a X 0 0 0 co J ZadXXX ea 000 O O O T O O O O O (0 0 p 0 O O 0 0 0 0 0 O 0 0 O O CO O Ly O O O O O O O O Cp 1 0 0 0 O (O O O O O O w O c0 O O c0 O O O co 0 0 O co O O co O O CO 0 0 CD 0 0 0 VQ OOc) Oc N7 N- N- d co O) O) O) OO N CO V ) N y � I O N O d 6 O O 6 6 O O C.- ifC i ` r �l • W co A� r r 0 16 O C a a a) TLLQ poa) I.. 0d d I c co to t.) ain330 v) a c� yO O M O (O 0 CO 0 cO O co N O CO M O CO •= (n o (n y r O o 0 0 r o r o CO m y o 0) M o 1' W = of N O O O of v c7 ri v a j b O Oi QO (n v 6 of a KING 0 Co 999o � 9o rnbbCNr` r, Co ca 1114g0 4Z `7.4' ^ o Hv Z m _ to 0_ 0 N CO at N- 0 CO r O O r o) N- N N Cfl (0 n Q N Z r �? V O r CO r N- N r n 00 CO r r O O 00 OD (- M N O 4 r (f) r` CO 6 4 O O r O O N CC) ',', V U) CO N. 0 M N r` O N h co CA co co C'7 n V (0 (0 U) _ co CO (O CO O CO 0 (f) (0 M CO N N r s--, CT) O oo r r` 0 N ' N CV N N N N N N N N N N N N N Ci. _ _ - 0 O Q to 3 1 O O O d) co O 3 Y O N Co N O (T) a) <—o) 7 O O O co O O O O O co O 0 0 O O O 0 0 O O O 0 O 0 0 0 0 0 0 0 0 0 0 0 0 O O 0 0 0 0 O o 0 N N N N N N N N N N N N N N N N N N N N •N O W R. E 6 U r r r r r r r r r ,— r r r r r r r r r r r fnO 3 d os N X m cE .. a) 2 —1o 6 O O h CD CO V N 0 V V Tr V 0 N Q) O O r O r-- 0 0 'Q (D (D V to N. r r CO CO r r N Cr) CO O V O r N CO O C O (O cO O r` 6 Ni O N- N- Cn r CO CO n 6) N N CO O t rA O O O C- N CONC')) Th (0 CO CO TY C.I CO CI c0 N N- 00 OD O o) C O O CO 0o r r m 5= r-- r r� r- n r� n r- r- r- N- r� r; r`; n 05 m ao N co CO (0 CO O CD CO CO CD (0 CO CO o o CO (0 CO CO (0 CO CO O c - CO CO CO (D CO CO CO CO CO CO CD CD CD CO CO CO to CD CO o CD a) o w c ui u io n c o d 2 _ _ _ O - 0 , to M r• N- O CO co r CO CO CO OD U0 CD NM 01 a- r N- N CO O CV W CO U) a O yd. y d U N '.. N M O N- W V b c0 m O O O O n O O r O b M CO (0 CO C 00 UD re ix L/ c (0 V co NNNN CO CO C) COM V (0 CO CD r CO OD (� O :° tv v v v v v v v v v v v v v v v v ('') M C`) (') M Tr- Co co M CO CO CO CO co co co co M co co M J Z Cl) ❑ 0 C) O O C) O O O co O O O O O O 0) 0) 0) 0) 0) 0) O Z Cn U) (n 6' U) U) 1.6 M) (C) CC) (n (f) M) Cf) (0 (f) C!') (() 6 (C7 (C) L O O CO N O (0 O (O O N M W CO (0 CO (0 O M l0 O r co O N- N (0 CO N N- N CO r CD r r O O O V cc r6 O 6 V N 6 Ni N O Ni Ni CO 6 V tb M V r Ni U) CD N V CO M CO O O O O (0 O N r CO N M W TrTY (0 (17 (0 (O t` h 00 O O r r r N N M CO (0 (0 '.. Q. y r r r r r r r r N N N N N N N N N N N N N m = W 3 F 0 0 CO CO O CD CO Tr CO CO n CO O V 0 (D N- (O M M CO V N 0 V O 0 0) n OD 0 M N O M co O O O co 6 .o- CO (() 66 M M6 6 N- O O Ni V (O U O O6 O O CO CO V co r O (n O O O CO CO V O co in co (0 N. 0) O 0) N N M M Cl TN V• V CO CO M CO N 0 0 0) 00 CO CO (/)N (n Cn (n U U U) U) (0 (0 U) (C) (0 U) U) (0 U) (n (n I V� V Q. Z 3. N N- O (C) O M O CO CO M 0 O CO O N 140 Tr OD N- V O CO Y O Tr O r N N 0 CO CO CO V V CO 0 (O N 00 N- O O N 4 V 4 M O CO V V 6 r` O O O r O O N N N M M M CO Cl Cl N N N N N N N M Cl N (q o) CO O CO o) 0) O O O O O CO 0) 0) 0) 0) 0 O O rn rn CO= C C 06 6 ao ao (D c6 c6 ao ao o6 U) a() (, ao (b co co c6 06 c ❑ CO O N V M M V N- N_ N CD (0 r r r` (0 O O C) 00 O CO CO O CO N O CO O at r` CO N N N M N CO (0 4 O 4 N O W N- 6 M CO N- O W CO 6 N M M 6 6 V• V M N r O O CO r- (D CD C00 M N r N M ' TN CO Q "" r r r r r r (I) Q O CO O CO (0 O N- N M TN M (D (0 N O C.1 Tr O O O CO CO OD O CO CO CO 'I" O CO O O 0 N O 00 CO 00 00 O O N co O W O OD O O O r) Cfl (6 co O co co co co co CD O O O O O co W co CO CO 0) O O O 0 w 0 0_ III V c o a) (_ L L d < < = "o X O 0 0 O 2 m r Z 0 0_ X X X o 0 0 0 0 0 0 0 0 0 0 C) 0 0 0 O O 0 0 0 0 4 CD O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O CO (O - C� Ci O CD 6O C) 6[7 (O f7 O 6 (D O (j (O C7 (f) CO O O .O a0 O 0 0 O (1) C) M O O O (D O O Cr) O Ti a 3 (0 (i) O r M O O O r N N Cl CO TI- (0 CO CO h W W O N .0 C .. d CO ❑N r r r •r O' N N N N N N NN N N N MN N N a N V l0 C C as v ,— co C) r r r r •r r r r r r r r r r r O 0 d c .o d d d c (.) am ❑ a . ■ IA U) U) O 0 0 0 O b W o r) o co 0 o O o a LAIN_ = ai o 0 0 0 0 0 0 `Wo -o co a) co co co co m m u.as 0 = W c a " o F F' o Z 0 3 cn 0 CO oa) a Z ino ) 0) v V Q Env" ai r c0 ao ai U) 0 Z �nl 01 U) f0 c0 4 -c0 10 c CO Q) O o N c• r o d js- o O 2 a) O O y p N W O N CD 0 CD CD J a) 7 Q co O co O O O O 0 CO U r Csi NY Csi NY O )i E u co y X o d 2 ,- F2w 0 1 O v o 10 v s- v 0 v d O srN cO 0 a t co n a 0) a) N CVc co V a 6 05 a) 2 `r N co c0 CO c0 CO CO CO O W C (a v (0 CO CO co CO CO CO O U) a) O W d CV C cOj d c- d y C 4 ▪ c 0 ` c O E r.' °_' ` a) co m ,-- co0n CO co 2 a) w A O 0) 41 a)0 N 0 00 of a) ai 6 V r o ✓ CL d >^ m c m m a) co 0) o ra re .c a) a 0• > G o = co r 2 rn cc?) o 0 rn rn rn VI i SII a)y co J rd Z N D Z U) U) U) O U) U) U) U) c d C N o co!a N NOD CO c+) U? ) N Uco O) G X CO y CO M v 6 4 a) 10 0 CO a0 cNO O N- co0m an) aM ! N CV- u) N N N N N N W - c I— U C') co co v u) ` a a? a) co O do r) U) co ,� CO M fh co M 0 v ccoo co a) 0 0o � n n Co co LO a) m y q v q ir v v 1 Q. z , a) E . m _ z CO CD 10 sr U) N N- co O cco 0 0) V a) c0 r C') co r W (1) a) a) co co co a) rn a) Cl)V coO O co. O 0) co au O N m CD COnCO Cr) N- CO CD vvvv co CO v r N CO Q *.' O r` C) O= a) U) aco O O O coO 0) m 0) o o > Q N s- v v 0) rn 0) 6 6 M O 6 V N N CO 0) O) 0) 0) CO r` CO U) U o • 0) O G 'a O md cco co a t O d .c -c Q Q o v) d 7 co 13 X 0 0 0 O CO Q O 2 m — .— O 2 Z d d X X X co > O O o O O O O O M O O o O O O O — .4 0 0. = o co O1 N- N co co sr R 'Sr CIE C 'p ,N .- ai O e e0- .- .- s- d R O. y a as c 5ta vs 10 0 0 a- co 0 a. 0 S a SNA � m m= W c o o) 6 Z co a Co 4 Q O @ ❑ c.) 0 to a i 0 0 o m @ li o 5 co m N (n J O Q (O O 0 CO O I- E co 0 7 co cu a) (c13 �_ 2i 2 H W ci c p .c O m w I m c c ci u is 'Es a c' (.) d R c c c' 9 d woo oo d • Ce Tm To t O Jo JI- 2ZW 0 L b- 0.. Na) LL r 0) CL CO M Y 0 O _i 0 >, o ❑ a) CO mcoi Ma co m E O cn E a 0 c m 0 H Y co 4 W co I- co cn O N coM Ln O 0 a Q Q (On CO CO a) O r- 4^ co R N CO (O N CO LCO LO LO 0 CO LC) ---a) (O N CO 4 O N- 6 r N (+) CO N4 Ma; V V 4 a) N a' co N 4 co to (NI N V N O N- S-' O O O U)6 ' to R U) in N ,- N V' co N- a) y 3 N N N N N N N 10 + c_ 'O O O V co N- N U) CO CO O (0 N- a) Ln CO CO co 10 co a) ,- W co (N1 co V 0 (O N co co a) co O () --- _O M (O (O M Ln 6 0 V a) (O M (f) N o � CO L CO O Nr cO c0 CO V CO W CO CO J `f = 4 4 4 Ln co co co co co co co co op r in ?v 1 -f - -I -I -1 In Ln Ln 47 Ln - -I v 1 a co a) (D O (O O CO LO N )- a) CO O LO N- CO (n (I) CO CO 4 co IO N- ,- O co O N O V co 6 N- 0 -4 = r O (O O Ln (O (O a0 N- V (O V O a) V O N V `- CO O CO CO (O CO N N CO N N CO O a) a) d H w rn a) a) a) a) a) a) a) a) co a) a) a) a) co 0 Q p oo co ao ao co ao co- ao ao op- 6 ao no cd ao co 05 co O• a N I O ma E 0 m a 000N- 0000000000000 0 0 0 (D 0 0 0 0 0 0 0 0 0 0 0 0 0 _c -c X o 0 0 3 a o ui O o co (o co (o (o (fl co (o (o 0 co CO Ln CO 0 (O CO Ln CO (O O CO N- a) O 2 m — e- — (a O N h n c) a) co N LO LO co N CO (O CO O c- V Z a a X X X c yO O O O O O N N N N M M M O 2 T O) m V C y c A) V' Lo 0 a8Q Ua )pmr_ yIR N O GG1 s I • • I 1111W F h M _�'8 I IR is 8 � �o o - td . 4,„i ! ..,.., ea a7, Vg1 iiiil eV 1) i 1 n a&&e o - $ x o WI f:‘, ■■M r o 0 43 a IIIIIIMMI o A ci o� 8 e, un c x 8� �� T o �_ . o _ _ _ " 8 y I ■■■■ 8 0 v ow e 7 '4' 9 / 11 'n �sn OSI)v(+)quoN%(-)q noSN �■■. r v mi LI ; j am = o a U ...111ed _ I a '''F'' re F oo ■ p000,0000000000000 - - ll' 00000 000.0,o, o,,, 'moi i- 1 e toO', ,, co , -11 S y�^r709mffi �1cw4a m c a o an ea xoy00000000S$$8o80 10377.-•'<'i F re a A — ( - e �z er��rrrr 1 w1Ig o m n ooB88888S8o o ix .gs,.m rrrrrrrr E ti n 3m rt R'''�gi8 r cm m " k fficr,molmmmmoaoso,o,mm mm mmmmmmmmmmmmmmmmm roi � � • � ..o ---m i § Q 2m6oam« <m I -0 66n.:Oeiriadr.i6cri666ni mmmm� a o ` 0 a No � � oS28888,7-8, oo.So_.__mrrE..� s—r7Vhml—mmo—rfVv'(N g E1a Es s ' m 38 m m ' In (u/gsn OS)(Nola poplaik an.q, m VI W Oil `a0 a -- - - - - - m T- i-, r 1 ,„ . y e,g1. `'� — --- s OW I - 0,,_,_ ,,., 0 0,,,, , 8' 1 EMIIIIIIIIIME xo X ::11u o— a Qo X X e X! I■■■ g ! WI Mil m >'< SMINIE -- s ,- ?i it ■■■ it II$ ■■■ - g I O g 8 -...01111■1111.11.11111. a g s . PIIM11111.111111110r `—+ � a , a � g ao s oll A aaXX ■■■■ xQ T fT 8occ ' E Elio. Q $_ca ■ 4iI WS a ' o _ 1, g _ $ — N mm _ _ — g $ c (uwusn OOZ)(+) oN/()y;nos z 1 CC �_ 151.'11 m V, .4, Wd V Nm42,92��m � o 3 N >'Memmm 2 e 2 mS W '03 SSS S�Z fi u R rfJ P �i2nFl a `oma m m 'm 3 S a a I > ' g 5> CO 3 0 0 NNNNNNN N4 x x S a it >S ,7 '> > `> '> , s X X X > S X y > 8 et oe R -F4 ,'J -rNR2 ' N sx s" �x 'E m x Qm x x F"i ".“% m a z r. r. z a x n r x ao208soNNNNNNNNNNN �_ R R R � "8,7 '7 11 ,7 1r'7 5 x 5 5 5 5 5 5 m N o 0 0 x 't x x x x Ax x x x x x x x x x x x x x x 3Nn 2 m S D No Z 555115555R555551r2r5§ 55355 'z511 - x x x x x x x x x x x x x x x x x x x x x x x x x x Pa Omnem,nm�avn`"i�m HCr(HCN rr my w 4 4 4 4 + . * , + , . . + , * * ► 1 4 1 1 1 1 • / 1 P a 3' mWb' m�Wmr 5 $ sz w >Ovi > $ m1R ` ',7) “TqWqqrpr9TWOrVil . 1-8gg 4 .-x _ _ a > > > s > > .. xx g8 Fmmmmmmmsmmmmmmmmm > > > > m > W m o > 'I r n '>+,$r e X a ' m x x • e u�3 oii - neoq x o x x x x x x x c x'� x '� a x x ,i Z; 7 7 1+ dg -a2mmo .-<ci nrigv$em W mmmmm g $ ��222 `" a 22 a "- x $ xxxxxxxxxx "xxxxxxxmxxxxxm § ih m88 Egg - �; a o;m m m o Elige et N` -o X xX x xx x xx xx xx xx x x x x x x x x x x x x x x x x x x €2. nim �0e 4 4 4 1 = 1 + 4 4 - 4 4 4 4 4 4 4 4 4 4 4 4 4 * 2 7z giai g n 8 n 8 o om m2 m a g 288222 R0oeooaee0o88o0880000008'0 2 4 o8,ma8NNNNN27.2 ;:: w' 2ammnm2o�rv2ammr 38 4.0 • CT) 8i 8 _ \ EN2,7k ........„...„......: 74 ,;, ocli ..... _._... ......„, .......,,,.., „.....„ , .0 O _ _ n.,,, ..„_...__......,.. ____,.....„.....__,.. \ . 0 is ...o /�s) 13§Ers 8 n / / /- \\\ \\ `; a /ice_ \� \ o udl um p o C- N 4b0 0 0 0 0 0 0 0 0 0 p p o 0 0 0 0 0 0 v N 0 CO CO VT N O m t0 _ n, QQ o Q 7 c, . I� m N N 0 O ^ 1. - r r r r m Q� Imp i ��� ��/ ��ii0QO/�U�������� LXX X x 00\gt Ww\ �� \ O =- j CO � /iii/ s\ � _moi r 0 z t,, 3' -4-z \\ '.......:::„aa.TA-mimag000k E *in i g -.-.•—,..,.. ...-.".."'-'--g------------__.—.-----•"-.."....--....Pr%,-"...%-...... ,, / / h 2 ic A 7 %.4 sil I . ,_,\,.,...„-„,....„..."...z......, .........._____e.: %'.-----..._----...____---.-:-- ----------'----'.--_..---___.--_..--//, o 0 ' .-.••••. „.-..-•-- 1 I I I€II I 0___-----•--- -----_..---______ _,-// 1 Øbp North America - ALASKA - BP Prudhoe Bay PB X Pad X-10 500292046700 X-10A* X-10A WP07 Travelling Cylinder Report 06 January, 2015 BAKER HUGHES INTEQ ER 4 0 by Travelling CylinderBP Report HUGHES INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB X Pad MD Reference: 12:10 7/6/1980 00:00©74.94usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: X-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore X-10A* Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: X-10A WP07 Offset TVD Reference: Offset Datum Reference X-10A WP07 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of refer Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 10,700.00 to 13,490.00usft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,545.31 us Error Surface: Elliptical Conic Survey Tool Program Date 1/6/2015 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 10,700.00 1 :Sperry-Sun BOSS gyro multi(X-10) BOSS-GYRO Sperry-Sun BOSS gyro multishot 10,700.00 13,490.00 X-10A WP07(X-10A*) MWD MWD-Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 13,490.00 8,997.01 2 7/8" 2.875 4.125 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB X Pad X-09-X-09-X-09 13,490.00 10,875.00 1,262.94 1,228.91 47.40 Pass-Major Risk X-09-X-09A-X-09A 13,490.00 10,875.00 1,262.94 1,228.91 47.40 Pass-Major Risk X-09-X-09B-X-09B 13,382.11 11,600.00 650.95 4.91 650.66 Pass-Minor 1/10 X-09-X-09B-X-09B wp04 13,394.12 11,575.00 673.28 5.41 672.81 Pass-NOERRORS r' X-10-X-10-X-10 10,725.00 10,725.00 0.07 0.46 -0.40 FAIL-NOERRORS X-19-X-19B-X-19B Out of range X-19-X-19BL1-X-19BL1 Out of range X-19-X-19BL2-X-19BL2 Out of range X-19-X-19BL2-01 -X-19BL2-01 Out of range X-19-X-19BL2-01*-X-19BL2-01 Out of range X-19-X-19BPB1 -X-19BPB1 Out of range X-20-X-20-X-20 Out of range X-20-X-20A-X-20A Out of range X-20-X-20PB1 -X-2OPB1 Out of range 11 X-22-X-22-X-22 Out of range X-22-X-22A-X-22A Out of range X-30-X-30-X-30 11,575.00 10,700.00 1,476.85 986.85 572.74 Pass-Major Risk X-30-X-30A-Plan#13 11,575.00 10,700.00 1,476.85 986.66 572.86 Pass-Major Risk X-30-X-30A-X-30A 11,575.00 10,700.00 1,476.85 986.66 572.86 Pass-Major Risk X-30-X-30APB1 -Plan#11 11,575.00 10,700.00 1,476.85 986.62 572.91 Pass-Major Risk X-30-X-30APB1-X-30APB1 11,575.00 10,700.00 1,476.85 986.72 572.82 Pass-Major Risk X-30-X-30APB2-X-30APB2 11,575.00 10,700.00 1,476.85 986.66 572.85 Pass-Major Risk X-30-X-30PB1 -X-30PB1 11,575.00 10,700.00 1,476.85 989.69 571.07 Pass-Major Risk X-31-X-31-X-31 Out of range X-31 -X-31 L1-Plan#4x Out of range X-31 -X-31 L1-X-31 L1 Out of range X-33-X-33-X-33 11,925.00 11,425.00 1,247.83 603.67 745.09 Pass-Major Risk X-33-X-33PB1-X-33PB1 11,925.00 11,425.00 1,247.83 603.50 745.27 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/6/2015 3:37:48PM Page 2 COMPASS 5000.1 Build 61 • BP Rae • 0 by Travelling Cylinder Report HUGHES INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB X Pad MD Reference: 12:10 7/6/1980 00:00©74.94usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: X-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore X-10A* Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: X-10A WP07 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB X Pad X-35-X-35-X-35 Out of range X-35-X-35L1 -Plan#5 Out of range X-35-X-35L1 -X-35L1 Out of range X-36-X-36-X-36 Out of range Offset Design PB X Pad- X-09-X-09-X-09 Offset She Error: 0.00 usft Survey Program: 100-BOSS-GYRO Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +141-S +El-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (') (usft) (usft) (in) (usft) (usft) (usft) 13,450.00 8,973.84 10,275.00 7,671.81 249.66 347.73 48.09 -4,022.66 3,573.13 3.500 1,536.11 1,055.31 549.70 Pass-Major Risk 13,450.00 8,973.84 10,300.01 7,688.49 249.66 349.11 48.80 -4,037.37 3,584.58 3.500 1,521.61 1,057.57 528.82 Pass-Major Risk 13,450.00 8,973.84 10,325.00 7,705.19 249.66 350.48 49.52 -4,052.09 3,595.93 3.500 1,507.33 1,059.82 508.25 Pass-Major Risk 13,450.00 8,973.84 10,350.00 7,721.89 249.66 351.85 50.26 -4,066.88 3,607.21 3.500 1,493.27 1,062.07 487.97 Pass-Major Risk 13,450.00 8,973.84 10,375.00 7,738.60 249.66 353.22 51.01 -4,081.74 3,618.39 3.500 1,479.43 1,064.33 468.00 Pass-Major Risk 13,450.00 8,973.84 10,400.01 7,755.32 249.66 354.59 51.77 -4,096.66 3,629.50 3.500 1,465.82 1,066.58 448.35 Pass-Major Risk 13,450.00 8,973.84 10,425.00 7,772.01 249.66 355.98 52.55 -4,111.65 3,640.51 3.500 1,452.47 1,068.89 429.02 Pass-Major Risk 13,450.00 8,973.84 10,450.00 7,788.68 249.66 357.36 53.34 -4,126.75 3,651.42 3.500 1,439.37 1,071.21 410.06 Pass-Major Risk 13,450.00 8,973.84 10,475.00 7,805.31 249.66 358.74 54.15 -4,141.95 3,662.24 3.500 1,426.54 1,073.52 391.47 Pass-Major Risk 13,459.91 8,979.32 10,500.01 7,821.93 249.66 360.13 54.97 -4,157.26 3,672.97 3.500 1,413.84 1,104.20 343.24 Pass-Major Risk 13,461.71 8,980.34 10,525.00 7,838.50 249.66 361.53 55.81 -4,172.64 3,683.62 3.500 1,401.53 1,111.80 320.01 Pass-Major Risk 13,463.52 8,981.36 10,550.00 7,855.03 249.66 362.94 56.66 -4,188.09 3,694.25 3.500 1,389.55 1,119.47 297.25 Pass-Major Risk 13,465.35 8,982.40 10,575.00 7,871.53 249.66 364.35 57.53 -4,203.59 3,704.85 3.500 1,377.91 1,127.17 274.98 Pass-Major Risk 13,475.00 8,988.00 10,600.01 7,888.00 249.65 365.76 58.42 -4,219.16 3,715.43 3.500 1,366.70 1,157.14 230.30 Pass-Major Risk 13,475.00 8,988.00 10,625.00 7,904.45 249.65 367.17 59.32 -4,234.77 3,725.93 3.500 1,355.70 1,159.73 214.53 Pass-Major Risk 13,475.00 8,988.00 10,650.00 7,920.92 249.65 368.59 60.23 -4,250.43 3,736.35 3.500 1,344.99 1,162.32 199.28 Pass-Major Risk 13,475.00 8,988.00 10,675.00 7,937.41 249.65 370.01 61.15 -4,266.14 3,746.66 3.500 1,334.57 1,164.91 184.58 Pass-Major Risk 13,475.00 8,988.00 10,700.01 7,953.92 249.65 371.43 62.09 -4,281.90 3,756.88 3.500 1,324.47 1,167.50 170.46 Pass-Major Risk 13,475.00 8,988.00 10,725.00 7,970.44 249.65 372.84 63.04 -4,297.69 3,767.00 3.500 1,314.69 1,170.11 156.94 Pass-Major Risk 13,475.00 8,988.00 10,750.00 7,986.98 249.65 374.25 64.01 -4,313.52 3,777.04 3.500 1,305.25 1,172.71 144.05 Pass-Major Risk 13,480.41 8,991.21 10,775.00 8,003.52 249.65 375.66 64.99 -4,329.40 3,787.00 3.500 1,296.12 1,190.84 116.22 Pass-Major Risk 13,482.37 8,992.38 10,800.01 8,020.09 249.65 377.07 65.98 -4,345.31 3,796.89 3.500 1,287.34 1,199.09 99.12 Pass-Major Risk 13,484.34 8,993.56 10,825.00 8,036.67 249.65 378.46 66.98 -4,361.25 3,806.66 3.500 1,278.89 1,207.39 82.71 Pass-Major Risk 13,490.00 8,997.01 10,850.00 8,053.31 249.65 379.86 68.00 -4,377.21 3,816.33 3.500 1,270.77 1,226.21 56.77 Pass-Major Risk 13,490.00 8,997.01 10,875.00 8,070.00 249.65 381.25 69.02 -4,393.18 3,825.88 3.500 1,262.94 1,228.91 47.40 Pass-Major Risk,CC,ES, CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/6/2015 3:37:48PM Page 3 COMPASS 5000.1 Build 61 • eP Mill • 0bp Travelling Cylinder Report HUGHES INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB X Pad MD Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: X-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore X-10A` Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: X-10A WP07 Offset TVD Reference: Offset Datum Offset Design PB X Pad- X-09-X-09A-X-09A Offset Site Error: 0.00 usft Survey Program: 100-BOSS-GYRO,12025-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Tooiface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/-S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (In) (usft) (usft) (usft) 13,450.00 8,973.84 10,275.00 7,671.81 249.66 347.73 48.09 -4,022.66 3,573.13 3.500 1,536.11 1,055.31 549.70 Pass-Major Risk 13,450.00 8,973.84 10,300.01 7,688.49 249.66 349.11 48.80 -4,037.37 3,584.58 3.500 1,521.61 1,057.57 528.82 Pass-MajorRisk 13,450.00 8,973.84 10,325.00 7,705.19 249.66 350.48 49.52 -4,052.09 3,595.93 3.500 1,507.33 1,059.82 508.25 Pass-MajorRisk 13,450.00 8,973.84 10,350.00 7,721.89 249.66 351.85 50.26 -4,066.88 3,607.21 3.500 1,493.27 1,062.07 487.97 Pass-Major Risk 13,450.00 8,973.84 10,375.00 7,738.60 249.66 353.22 51.01 -4,081.74 3,618.39 3.500 1,479.43 1,064.33 468.00 Pass-Major Risk 13,450.00 8,973.84 10,400.01 7,755.32 249.66 354.59 51.77 -4,096.66 3,629.50 3.500 1,465.82 1,066.58 448.35 Pass-Major Risk 13,450.00 8,973.84 10,425.00 7,772.01 249.66 355.98 52.55 -4,111.65 3,640.51 3.500 1,452.47 1,068.89 429.02 Pass-Major Risk 13,450.00 8,973.84 10,450.00 7,788.68 249.66 357.36 53.34 -4,126.75 3,651.42 3.500 1,439.37 1,071.21 410.06 Pass-Major Risk 13,450.00 8,973.84 10,475.00 7,805.31 249.66 358.74 54.15 -4,141.95 3,662.24 3.500 1,426.54 1,073.52 391.47 Pass-Major Risk 13,459.91 8,979.32 10,500.01 7,821.93 249.66 360.13 54.97 -4,157.26 3,672.97 3.500 1,413.84 1,104.20 343.24 Pass-Major Risk 13,461.71 8,980.34 10,525.00 7,838.50 249.66 361.53 55.81 -4,172.64 3,683.62 3.500 1,401.53 1,111.80 320.01 Pass-Major Risk 13,463.52 8,981.36 10,550.00 7,855.03 249.66 362.94 56.66 -4,188.09 3,694.25 3.500 1,389.55 1,119.47 297.25 Pass-MajorRisk 13,465.35 8,982.40 10,575.00 7,871.53 249.66 364.35 57.53 -4,203.59 3,704.85 3.500 1,377.91 1,127.17 274.98 Pass-Major Risk 13,475.00 8,988.00 10,600.01 7,888.00 249.65 365.76 58.42 -4,219.16 3,715.43 3.500 1,366.70 1,157.14 230.30 Pass-Major Risk 13,475.00 8,988.00 10,625.00 7,904.45 249.65 367.17 59.32 -4,234.77 3,725.93 3.500 1,355.70 1,159.73 214.53 Pass-Major Risk 13,475.00 8,988.00 10,650.00 7,920.92 249.65 368.59 60.23 -4,250.43 3,736.35 3.500 1,344.99 1,162.32 199.28 Pass-Major Risk 13,475.00 8,988.00 10,675.00 7,937.41 249.65 370.01 61.15 -4,266.14 3,746.66 3.500 1,334.57 1,164.91 184.58 Pass-Major Risk 13,475.00 8,988.00 10,700.01 7,953.92 249.65 371.43 62.09 -4,281.90 3,756.88 3.500 1,324.47 1,167.50 170.46 Pass-Major Risk 13,475.00 8,988.00 10,725.00 7,970.44 249.65 372.84 63.04 -4,297.69 3,767.00 3.500 1,314.69 1,170.11 156.94 Pass-Major Risk 13,475.00 8,988.00 10,750.00 7,986.98 249.65 374.25 64.01 -4,313.52 3,777.04 3.500 1,305.25 1,172.71 144.05 Pass-Major Risk 13,480.41 8,991.21 10,775.00 8,003.52 249.65 375.66 64.99 -4,329.40 3,787.00 3.500 1,296.12 1,190.84 116.22 Pass-Major Risk 13,482.37 8,992.38 10,800.01 8,020.09 249.65 377.07 65.98 -4,345.31 3,796.89 3.500 1,287.34 1,199.09 99.12 Pass-Major Risk 13,484.34 8,993.56 10,825.00 8,036.67 249.65 378.46 66.98 -4,361.25 3,806.66 3.500 1,278.89 1,207.39 82.71 Pass-Major Risk 13,490.00 8,997.01 10,850.00 8,053.31 249.65 379.86 68.00 -4,377.21 3,816.33 3.500 1,270.77 1,226.21 56.77 Pass-MajorRisk 13,490.00 8,997.01 10,875.00 8,070.00 249.65 381.25 69.02 -4,393.18 3,825.88 3.500 1,262.94 1,228.91 47.40 Pass-Major Risk,CC,ES, CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/6/2015 3:37:48PM Page 4 COMPASS 5000.1 Build 61 • BP Mai • 0 by Travelling Cylinder Report HUGHES INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB X Pad MD Reference: 12: 10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: X-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore X-10A* Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: X-10A WP07 Offset TVD Reference: Offset Datum Offset Design PB X Pad- X-09-X-09B-X-098 Offset Site Error: 0.00 usft Survey Program: 96-BOSS-GYRO,9991-MWD+IFR+MS-WOCA Rule Assigned:Minor 1/10 Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/-S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (in) (usft) (usft) (usft) 12,438.28 8,926.55 13,125.00 8,926.75 249.91 329.60 135.68 -6,380.09 3,376.90 3.500 1,536.08 4.89 1,535.79 Pass-Minor 1/10 12,450.00 8,926.77 13,000.00 8,926.00 249.91 329.59 134.21 -6,255.41 3,367.94 3.500 1,442.42 4.93 1,442.13 Pass-Minor 1/10 12,450.00 8,926.77 13,025.00 8,926.21 249.91 329.59 134.23 -6,280.34 3,369.75 3.500 1,460.83 4.95 1,460.54 Pass-Minor 1/10 12,450.00 8,926.77 13,050.00 8,926.39 249.91 329.59 134.25 -6,305.28 3,371.51 3.500 1,479.40 4.97 1,479.10 Pass-Minor 1/10 12,450.00 8,926.77 13,075.00 8,926.56 249.91 329.59 134.27 -6,330.22 3,373.23 3.500 1,498.12 4.99 1,497.83 Pass-Minor 1/10 12,450.00 8,926.77 13,100.00 8,926.68 249.91 329.60 134.29 -6,355.16 3,375.01 3.500 1,517.08 5.02 1,516.78 Pass-Minor 1/10 12,462.59 8,927.01 12,975.00 8,925.78 249.90 329.58 132.71 -6,230.48 3,366.07 3.500 1,423.95 5.06 1,423.66 Pass-Minor 1/10 12,475.00 8,927.24 12,875.00 8,924.55 249.90 329.57 131.14 -6,130.71 3,359.41 3.500 1,352.66 5.13 1,352.37 Pass-Minor 1/10 12,475.00 8,927.24 12,900.00 8,924.92 . 249.90 329.58 131.17 -6,155.66 3,360.91 3.500 1,370.09 5.15 1,369.80 Pass-Minor 1/10 12,475.00 8,927.24 12,925.00 8,925.25 249.90 329.58 131.20 -6,180.61 3,362.52 3.500 1,387.82 5.17 1,387.53 Pass-Minor 1/10 12,475.00 8,927.24 12,950.00 8,925.53 249.90 329.58 131.22 -6,205.55 3,364.25 3.500 1,405.85 5.20 1,405.56 Pass-Minor 1/10 12,485.26 8,927.43 12,850.00 8,924.16 249.90 329.57 129.90 -6,105.76 3,357.98 3.500 1,335.38 5.24 1,335.09 Pass-Minor 1/10 12,490.10 8,927.51 12,825.00 8,923.74 249.89 329.57 129.29 -6,080.80 3,356.63 3.500 1,318.38 5.28 1,318.09 Pass-Minor l/10 12,500.00 8,927.69 12,750.00 8,922.26 249.89 329.56 128.01 -6,005.90 3,353.05 3.500 1,268.96 5.34 1,268.67 Pass-Minor 1/10 12,500.00 8,927.69 12,775.00 8,922.82 249.89 329.56 128.05 -6,030.87 3,354.14 3.500 1,285.13 5.36 1,284.83 Pass-Minor 1/10 12,500.00 8,927.69 12,800.00 8,923.29 249.89 329.57 128.09 -6,055.83 3,355.34 3.500 1,301.66 5.38 1,301.37 Pass-Minor 1/10 12,510.58 8,927.88 12,725.00 8,921.61 249.89 329.56 126.71 -5,980.92 3,352.09 3.500 1,253.02 5.46 1,252.73 Pass-Minor l/10 12,525.00 8,928.14 12,625.00 8,917.64 249.88 329.55 124.74 -5,881.06 3,348.95 3.500 1,192.36 5.56 1,192.07 Pass-Minor 1/10 12,525.00 8,928.14 12,650.00 8,918.94 249.88 329.55 124.82 -5,906.01 3,349.74 3.500 1,207.11 5.58 1,206.81 Pass-Minor 1/10 12,525.00 8,928.14 12,675.00 8,920.02 249.88 329.55 124.90 -5,930.98 3,350.51 3.500 1,222.18 5.59 1,221.88 Pass-Minor 1/10 12,525.00 8,928.14 12,700.00 8,920.88 249.88 329.56 124.96 -5,955.95 3,351.26 3.500 1,237.56 5.61 1,237.27 Pass-Minor 1/10 12,538.64 8,928.38 12,600.00 8,916.12 249.88 329.55 123.03 -5,856.12 3,348.15 3.500 1,177.69 5.71 1,177.39 Pass-Minor 1/10 12,550.00 8,928.58. 12,525.00 8,910.96 249.88 329.54 121.36 -5,781.32 3,346.03 3.500 1,135.80 5.79 1,135.51 Pass-Minor 1/10 12,550.00 8,928.58 12,550.00 8,912.74 249.88 329.54 121.48 -5,806.25 3,346.67 3.500 1,149.39 5.81 1,149.10 Pass-Minor 1/10 12,550.00 8,928.58 12,575.00 8,914.46 249.88 329.54 121.59 -5,831.18 3,347.38 3.500 1,163.43 5.83 1,163.13 Pass-Minor 1/10 12,562.94 8,928.80 12,500.00 8,909.12 249.87 329.54 119.71 -5,756.40 3,345.45 3.500 1,122.40 5.93 1,122.11 Pass-Minor 1/10 12,575.00 8,929.01 12,425.00 8,903.40 249.87 329.53 117.89 -5,681.63 '3,343.98 3.500 1,084.48 6.03 1,084.19 Pass-Minor 1/10 12,575.00 6929.01 12,450.00 8,905.34 249.87 329.53 118.03 -5,706.55 3,344.43 3.500 1,096.73 6.05 1,096.44 Pass-Minor 1/10 12,575.00 8,929.01 12,475.00 8,907.25 249.87 329.54 118.16 -5,731.47 3,344.92 3.500 1,109.45 6.06 1,109.16 Pass-Minor 1/10 12,589.03 8,929.24 12,400.00 8,901.42 249.86 329.53 116.10 -5,656.71 3,343.58 3.500 1,072.41 6.19 1,072.12 Pass-Minor 1/10 12,600.00 8,929.42 12,375.00 8,899.35 249.86 329.53 114.65 -5,631.80 3,343.24 3.500 1,060.83 6.30 1,060.53 Pass-Minor 1/10 13,113.65 8,898.44 12,350.00 8,897.20 249.72 329.53 143.16 -5,606.90 3,342.95 3.500 1,041.60 2.10 1,041.31 Pass-Minor 1/10 13,125.00 8,897.91 12,275.00 8,890.14 249.71 329.52 141.53 -5,532.23 3,342.57 3.500 982.27 2.17 981.98 Pass-Minor 1/10 13,125.00 8,897.91 12,300.00 8,892.59 249.71 329.52 141.64 -5,557.11 3,342.57 3.500 1,001.80 2.19 1,001.50 Pass-Minor 1/10 13,125.00 8,897.91 12,325.00 8,894.95 249.71 329.53 141.74 -5,582.00 3,342.72 3.500 1,021.65 2.22 1,021.36 Pass-Minor 1/10 13,134.30 8,897.55 12,250.00 8,887.91 249.71 329.52 140.34 -5,507.33 3,342.59 3.500 962.87 2.27 962.58 Pass-Minor 1/10 13,139.88 8,897.36 12,225.00 8,886.31 249.71 329.52 139.61 -5,482.38 3,342.77 3.500 943.72 2.31 943.43 Pass-Minor 1/10 13,150.00 8,897.08 12,175.00 8,884.15 249.71 329.52 138.34 -5,432.43 3,343.15 3.500 905.93 2.40 905.64 Pass-Minor 1/10 13,150.00 8,897.08 12,200.00 8,885.13 249.71 329.52 138.39 -5,457.41 3,342.99 3.500 924.78 2.42 924.49 Pass-Minor 1/10 13,157.48 8,896.92 12,150.00 8,883.36 249.71 329.52 137.43 -5,407.45 3,343.25 3.500 887.24 2.48 886.95 Pass-Minor 1/10 13,163.63 8,896.83 12,125.00 8,882.75 249.71 329.52 136.69 -5,382.45 3,343.33 3.500 868.74 2.54 868.45 Pass-Minor 1/10 13,171.00 8,896.75 12,100.00 8,882.08 249.71 329.52 135.80 -5,357.47 3,343.77 3.500 850.70 2.62 850.40 Pass-Minor 1/10 13,186.24 8,896.87 12,075.00 8,880.90 249.70 329.51 135.70 -5,332.55 3,345.42 3.500 833.70 2.65 833.40 Pass-Minor 1/10 13,204.46 8,897.65 12,050.00 8,878.82 249.70 329.51 135.47 -5,307.80 3,348.23 3.500 817.64 2.73 817.35 Pass-Minor 1/10 13,222.45 8,899.10 12,025.00 8,875.58 249.70 329.51 135.11 -5,283.21 3,351.37 3.500 802.00 2.84 801.70 Pass-Minor 1/10 13,239.75 8,901.13 12,000.00 8,871.12 249.69 329.51 134.59 -5,258.81 3,354.40 3.500 786.52 2.97 786.23 Pass-Minor 1/10 13,256.26 8,903.65 11,975.00 8,865.23 249.69 329.51 133.90 -5,234.73 3,357.63 3.500 771.58 3.12 771.29 Pass-Minor 1/10 CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/6/2015 3.'37:48PM Page 5 COMPASS 5000.1 Build 61 BP NM , 0 by Travelling Cylinder Report BAR HUGHES INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB X Pad MD Reference: 12: 10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: X-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore X-10A* Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: X-10A WP07 Offset TVD Reference: Offset Datum Offset Design PB X Pad- X-09-X-09B-X-09B Offset Site Error: 0.00 usft Survey Program: 96-BOSS-GYRO,9991-MWD+IFR+MS-WOCA Rule Assigned:Minor 1/10 Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NI-S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (1 (usft) (usft) (In) (usft) (usft) (usft) 13,271.91 8,906.56 11,950.00 8,858.17 249.69 329.51 133.05 -5,210.99 3,361.03 3.500 757.23 3.27 756.94 Pass-Minor 1110 13,286.55 8,909.74 11,925.00 8,850.02 249.68 329.51 132.06 -5,187.62 3,364.53 3.500 743.52 3.43 743.22 Pass-Minor 1/10 13,300.00 8,913.04 11,900.00 8,840.57 249.68 329.51 130.90 -5,164.75 3,368.02 3.500 730.56 3.59 730.27 Pass-Minor 1/10 13,312.27 8,916.37 11,875.00 8,830.08 249.68 329.51 129.60 -5,142.34 3,371.60 3.500 718.47 3.74 718.18 Pass-Minor 1/10 13,325.00 8,920.14 11,850.00 8,818.67 249.68 329.51 128.17 -5,120.35 3,374.97 3.500 707.10 3.90 706.80 Pass-Minor 1/10 13,333.16 8,922.73 11,825.00 8,806.21 249.68 329.50 126.60 -5,098.91 3,378.09 3.500 696.59 4.02 696.29 Pass-Minor 1/10 13,341.65 8,925.57 11,800.00 8,792.55 249.67 329.50 124.91 -5,078.18 3,381.04 3.500 687.25 4.15 686.96 Pass-Minor 1/10 13,350.00 8,928.49 11,775.00 8,778.27 249.67 329.50 123.12 -5,057.86 3,383.88 3.500 678.90 4.28 678.60 Pass-Minor 1/10 13,356.05 8,930.70 11,750.00 8,763.53 249.67 329.50 121.25 -5,037.86 3,386.63 3.500 671.51 4.39 671.22 Pass-Minor 1110 13,362.07 8,932.96 11,725.00 8,748.19 249.67 329.50 119.30 -5,018.29 3,389.26 3.500 665.25 4.49 664.96 Pass-Minor 1/10 13,367.31 8,934.99 11,700.00 8,732.23 249.67 329.50 117.29 .4,999.22 3,391.76 3.500 660.19 4.59 659.89 Pass-Minor 1/10 13,375.00 8,938.07 11,625.00 8,681.45 249.67 329.50 110.97 -4,944.39 3,397.93 3.500 651.65 4.79 651.35 Pass-Minor 1/10 13,375.00 8,938.07 11,650.00 8,698.79 249.67 329.50 113.11 -4,962.31 3,396.07 3.500 653.37 4.75 653.08 Pass-Minor 1/10 13,375.00 8,938.07 11,675.00 8,715.75 249.67 329.50 115.22 -4,980.56 3,394.04 3.500 656.24 4.72 655.95 Pass-Minor 1/10 13,382.11 8,941.01 11,600.00 8,663.93 249.67 329.50 108.81 -4,926.65 3,399.73 3.500 650.95 4.91 650.66 Pass-Minor 1/10,CC,ES,5 13,384.84 8,942.17 11,575.00 8,646.21 249.67 329.50 106.65 -4,909.10 3,401.49 3.500 651.35 4.99 651.06 Pass-Minor 1/10 13,387.31 8,943.22 11,550.00 8,628.31 249.67 329.50 104.49 -4,891.73 3,403.21 3.500 652.83 5.07 652.54 Pass-Minor 1/10 13,389.53 8,944.18 11,525.00 8,610.26 249.67 329.50 102.34 -4,874.51 3,404.83 3.500 655.32 5.14 655.03 Pass-Minor 1/10 13,391.52 8,945.05 11,500.00 8,592.08 249.67 329.50 100.20 -4,857.42 3,406.35 3.500 658.78 5.21 658.49 Pass-Minor 1/10 13,393.31 8,945.84 11,475.00 8,573.77 249.67 329.50 98.09 -4,840.46 3,407.76 3.500 663.20 5.28 662.91 Pass-Minor 1/10 13,400.00 8,948.83 11,250.00 8,409.81 249.66 329.49 80.88 -4,686.94 3,420.94 3.500 740.07 5.76 739.77 Pass-Minor 1/10 13,400.00 8,948.83 11,275.00 8,427.82 249.66 329.49 82.60 -4,704.22 3,419.36 3.500 728.62 5.72 728.32 Pass-Minor 1/10 13,400.00 8,948.83 11,300.00 8,445.88 249.66 329.49 84.36 -4,721.43 3,417.80 3.500 717.82 5.68 717.53 Pass-Minor 1/10 13,400.00 8,948.83 11,325.00 8,463.99 249.66 329.49 86.19 -4,738.60 3,416.26 3.500 707.71 5.63 707.42 Pass-Minor 1/10 13,400.00 8,948.83 11,350.00 8,482.15 249.66 329.49 88.06 -4,755.72 3,414.75 3.500 698.32 5.59 698.03 Pass-Minor 1/10 13,400.00 8,948.83 11,375.00 8,500.36 249.66 329.49 89.98 -4,772.78 3,413.26 3.500 689.68 5.54 689.39 Pass-Minor 1/10 13,400.00 8,948.83 11,400.00 8,518.63 249.66 329.49 91.94 -4,789.78 3,411.82 3.500 681.83 5.50 681.54 Pass-Minor 1/10 13,400.00 8,948.83 11,425.00 8,536.96 249.66 329.49 93.95 -4,806.73 3,410.42 3.500 674.79 5.45 674.50 Pass-Minor 1/10 13,400.00 8,948.83 11,450.00 8,555.35 249.66 329.49 96.01 -4,823.61 3,409.08 3.500 668.59 5.41 668.30 Pass-Minor 1/10 13,408.00 8,952.53 11,225.00 8,391.86 249.66 329.49 79.21 -4,669.62 3,422.51 3.500 752.02 5.91 751.73 Pass-Minor 1/10 13,409.31 8,953.15 11,200.00 8,373.96 249.66 329.49 77.59 -4,652.23 3,424.07 3.500 764.62 5.97 764.32 Pass-Minor 1/10 13,410.60 8,953.75 11,175.00 8,356.12 249.66 329.49 76.03 -4,634.79 3,425.62 3.500 777.76 6.03 777.47 Pass-Minor 1/10 13,411.86 8,954.35 11,150.00 8,338.31 249.66 329.49 74.52 -4,617.32 3,427.21 3.500 791.46 6.09 791.16 Pass-Minor 1/10 13,413.10 8,954.94 11,125.00 8,320.52 249.66 329.49 73.06 -4,599.83 3,428.85 3.500 805.71 6.14 805.42 Pass-Minor 1/10 13,414.31 8,955.53 11,100.00 8,302.75 249.66 329.49 71.66 -4,582.33 3,430.55 3.500 820.49 6.20 820.20 Pass-Minor 1/10 13,415.50 8,956.10 11,075.00 8,285.00 249.66 329.49 70.30 -4,564.80 3,432.30 3.500 835.77 6.26 835.48 Pass-Minor 1/10 13,416.69 8,956.67 11,050.00 8,267.31 249.66 329.49 69.00 -4,547.24 3,434.10 3.500 851.49 6.32 851.20 Pass-Minor 1/10 13,425.00 8,960.77 10,625.00 7,969.55 249.66 329.48 53.05 -4,246.38 3,470.42 3.500 1,169.60 7.21 1,169.31 Pass-Minor 1/10 13,425.00 8,960.77 10,650.00 7,987.54 249.66 329.48 53.66 -4,263.34 3,466.79 3.500 1,148.09 7.16 1,147.79 Pass-Minor 1/10 13,425.00 8,960.77 10,675.00 8,005.45 249.66 329.48 54.32 -4,280.49 3,463.59 3.500 1,126.94 7.12 1,126.65 Pass-Minor 1/10 13,425.00 8,960.77 10,700.00 8,023.27 249.66 329.48 55.02 -4,297.81 3,460.84 3.500 1,106.21 7.07 1,105.91 Pass-Minor 1/10 13,425.00 8,960.77 10,725.00 8,040.98 249.66 329.48 55.77 -4,315.30 3,458.43 3.500 1,085.87 7.02 1,085.58 Pass-Minor 1/10 13,425.00 8,960.77 10,750.00 8,058.55 249.66 329.49 56.56 -4,332.94 3,456.17 3.500 1,065.88 6.97 1,065.59 Pass-Minor 1/10 13,425.00 8,960.77 10,775.00 8,075.98 249.66 329.49 57.38 -4,350.73 3,454.07 3.500 1,046.27 6.93 1,045.98 Pass-Minor 1/10 13,425.00 8,960.77 10,800.00 8,093.28 249.66 329.49 58.25 -4,368.68 3,452.13 3.500 1,027.06 6.88 1,026.77 Pass-Minor 1/10 13,425.00 8,960.77 10,825.00 8,110.51 249.66 329.49 59.16 -4,386.69 3,450.29 3.500 1,008.20 6.84 1,007.90 Pass-Minor 1/10 13,425.00 8,960.77 10,850.00 8,127.77 249.66 329.49 60.10 -4,404.69 3,448.50 3.500 989.61 6.79 989.32 Pass-Minor 1/10 CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/6/2015 3:37:48PM Page 6 COMPASS 5000.1 Build 61 • gp Nig , 0 by Travelling Cylinder Report HUGHES INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB X Pad MD Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: X-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore X-10A* Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: X-10A WP07 Offset TVD Reference: Offset Datum Offset Design PB X Pad- X-09-X-09B-X-09B Offset Site Error: 0.00 usft Survey Program: 96-BOSS-GYRO,9991-MWD+IFR+MS-WOCA Rule Assigned:Minor 1/10 Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +El-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) ('I (usft) (usft) (in) (usft) (usft) (usft) 13,425.00 8,960.77 10,875.00 8,145.06 249.66 329.49 61.08 -4,422.66 3,446.76 3.500 971.31 6.75 971.02 Pass-Minor 1/10 13,425.00 8,960.77 10,900.00 8,162.39 249.66 329.49 62.10 4,440.60 3,445.07 3.500 953.33 6.70 953.04 Pass-Minor 1/10 13,425.00 8,960.77 10,925.00 8,179.75 249.66 329.49 63.15 -4,458.51 3,443.36 3.500 935.62 6.65 935.33 Pass-Minor 1/10 13,425.00 8,960.77 10,950.00 8,197.16 249.66 329.49 64.24 -4,476.36 3,441.58 3.500 918.18 6.61 917.89 Pass-Minor 1/10 13,425.00 8,960.77 10,975.00 8,214.62 249.66 329.49 65.37 -4,494.16 3,439.73 3.500 901.03 6.56 900.74 Pass-Minor 1/10 13,425.00 8,960.77 11,000.00 8,232.12 249.66 329.49 66.54 -4,511.91 3,437.83 3.500 884.19 6.51 883.90 Pass-Minor 1/10 13,425.00 8,960.77 11,025.00 8,249.68 249.66 329.49 67.75 -4,529.60 3,435.94 3.500 867.70 6.46 867.41 Pass-Minor 1/10 13,434.68 8,965.70 10,600.00 7,951.45 249.66 329.48 52.48 -4,229.61 3,474.45 3.500 1,191.33 7.38 1,191.04 Pass-Minor 1/10 13,435.47 8,966.10 10,575.00 7,933.12 249.66 329.48 51.94 -4,213.13 3,478.64 3.500 1,213.47 7.44 1,213.17 Pass-Minor 1/10 13,435.72 8,966.23 10,225.00 7,659.16 249.66 329.48 45.81 -3,999.97 3,508.40 3.500 1,529.98 8.13 1,529.68 Pass-Minor 1/10 13,436.16 8,966.46 10,550.00 7,914.54 249.66 329.48 51.43 -4,196.97 3,482.93 3.500 1,235.88 7.50 1,235.59 Pass-Minor 1/10 13,436.51 8,966.64 10,250.00 7,679.21 249.66 329.48 46.27 -4,014.71 3,510.80 3.500 1,508.35 8.10 1,508.06 Pass-Minor 1/10 13,436.77 8,966.78 10,525.00 7,895.70 249.66 329.48 50.96 -4,181.13 3,487.33 3.500 1,258.55 7.56 1,258.26 Pass-Minor 1/10 13,437.15 8,966.98 10,275.00 7,699.24 249.66 329.48 46.72 -4,029.60 3,512.28 3.500 1,486.45 8.06 1,486.16 Pass-Minor 1/10 13,437.28 8,967.05 10,500.00 7,876.64 249.66 329.48 50.51 -4,165.57 3,491.75 3.500 1,281.43 7.61 1,281.14 Pass-Minor 1/10 13,437.67 8,967.25 10,300.00 7,719.21 249.66 329.48 47.16 -4,044.62 3,512.96 3.500 1,464.34 8.02 1,464.04 Pass-Minor 1/10 13,437.69 8,967.26 10,475.00 7,857.37 249.66 329.48 50.08 -4,150.22 3,495.99 3.500 1,304.41 7.67 1,304.12 Pass-Minor 1/10 13,438.01 8,967.43 10,450.00 7,837.91 249.66 329.48 49.67 -4,135.05 3,500.03 3.500 1,327.49 7.72 1,327.20 Pass-Minor 1/10 13,438.05 8,967.45 10,325.00 7,739.12 249.66 329.48 47.61 -4,059.74 3,512.87 3.500 1,442.04 7.97 1,441.74 Pass-Minor 1/10 13,438.22 8,967.54 10,425.00 7,818.26 249.66 329.48 49.27 -4,120.08 3,503.88 3.500 1,350.65 7.78 1,350.36 Pass-Minor 1/10 13,438.28 8,967.57 10,350.00 7,758.96 249.66 329.48 48.04 -4,074.91 3,511.89 3.500 1,419.51 7.93 1,419.21 Pass-Minor 1/10 13,438.34 8,967.60 10,400.00 7,798.50 249.66 329.48 48.87 -4,105.15 3,507.27 3.500 1,373.78 7.83 1,373.49 Pass-Minor 1/10 13,438.36 8,967.61 10,375.00 7,778.73 249.66 329.48 48.46 -4,090.08 3,509.94 3.500 1,396.73 7.88 1,396.44 Pass-Minor 1/10 CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/6/2015 3:37:48PM Page 7 COMPASS 5000.1 Build 61 BP KIM ` 0by Travelling Cylinder Report HUGHES INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB X Pad MD Reference: 12:10 7/6/1980 00:00©74.94usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: X-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore X-10A* Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: X-10A WP07 Offset TVD Reference: Offset Datum Offset Design PB X Pad- X-09-X-09B-X-09B wp04 Offset Site Error: 0.00 usft Survey Program: 96-BOSS-GYRO,9991-MWD+IFR+MS-WOCA,9994-MWD+IFR+MS-WOCA Rule Assigned:NOERRORS Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/-S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (1 (usft) (usft) (in) (usft) (usft) (usft) 12,410.54 8,926.03 13,200.00 8,942.21 249.92 329.65 139.61 -6,462.76 3,293.44 4.312 1,540.41 4.52 1,540.06 Pass-NOERRORS 12,414.37 8,926.10 13,175.00 8,940.17 249.92 329.65 139.07 -6,437.85 3,293.08 4.312 1,521.42 4.55 1,521.06 Pass-NOERRORS 12,425.00 8,926.30 13,075.00 8,931.70 249.91 329.64 137.46 -6,338.38 3,298.16 4.312 1,451.49 4.59 1,451.13 Pass-NOERRORS 12,425.00 8,926.30 13,100.00 8,933.82 249.91 329.64 137.56 -6,363.19 3,295.91 4.312 1,467.97 4.61 1,467.61 Pass-NOERRORS 12,425.00 8,926.30 13,125.00 8,935.93 249.91 329.65 137.65 -6,388.05 3,294.32 4.312 1,485.17 4.63 1,484.81 Pass-NOERRORS 12,425.00 8,926.30 13,150.00 8,938.05 249.91 329.65 137.74 -6,412.94 3,293.37 4.312 1,503.05 4.66 1,502.69 Pass-NOERRORS 12,436.31 8,926.52 13,050.00 8,929.59 249.91 329.64 136.03 -6,313.62 3,300.88 4.312 1,435.43 4.71 1,435.07 Pass-NOERRORS 12,450.00 8,926.77 12,950.00 8,921.13 249.91 329.63 134.02 -6,214.58 3,311.83 4.312 1,373.57 4.80 1,373.21 Pass-NOERRORS 12,450.00 8,926.77 12,975.00 8,923.25 249.91 329.63 134.12 -6,239.34 3,309.09 4.312 1,388.68 4.82 1,388.32 Pass-NOERRORS 12,450.00 8,926.77 13,000.00 8,925.36 249.91 329.63 134.22 -6,264.10 3,306.36 4.312 1,404.08 4.84 1,403.72 Pass-NOERRORS 12,450.00 8,926.77 13,025.00 8,927.47 249.91 329.64 134.32 -6,288.86 3,303.62 4.312 1,419.76 4.86 1,419.40 Pass-NOERRORS 12,461.22 8,926.98 12,925.00 8,919.06 249.90 329.63 132.59 -6,189.81 3,314.50 4.312 1,358.51 4.93 1,358.15 Pass-NOERRORS 12,475.00 8,927.24 12,825.00 8,913.48 249.90 329.62 130.64 -6,090.23 3,321.53 4.312 1,297.67 5.02 1,297.31 Pass-NOERRORS 12,475.00 8,927.24 12,850.00 8,914.72 249.90 329.62 130.72 -6,115.15 3,319.98 4.312 1,312.67 5.04 1,312.31 Pass-NOERRORS 12,475.00 8,927.24 12,875.00 8,915.97 249.90 329.62 130.79 -6,140.07 3,318.42 4.312 1,327.97 5.06 1,327.61 Pass-NOERRORS 12,475.00 8,927.24 12,900.00 8,917.33 249.90 329.63 130.87 -6,164.97 3,316.72 4.312 1,343.44 5.08 1,343.08 Pass-NOERRORS 12,487.51 8,927.47 12,800.00 8,912.23 249.90 329.61 129.09 -6,065.31 3,323.09 4.312 1,282.75 5.16 1,282.39 Pass-NOERRORS 12,500.00 8,927.69 12,725.00 8,908.49 249.89 329.60 127.37 -5,990.54 3,327.75 4.312 1,239.68 5.27 1,239.32 Pass-NOERRORS 12,500.00 8,927.69 12,750.00 8,909.74 249.89 329.61 127.45 -6,015.46 3,326.20 4.312 1,253.78 5.28 1,253.42 Pass-NOERRORS 12,500.00 8,927.69 12,775.00 8,910.98 249.89 329.61 127.53 -6,040.39 3,324.64 4.312 1,268.22 5.30 1,267.86 Pass-NOERRORS 12,510.09 8,927.88 12,700.00 8,907.24 249.89 329.60 126.09 -5,965.62 3,329.30 4.312 1,225.77 5.38 1,225.42 Pass-NOERRORS 12,515.97 8,927.98 12,675.00 8,905.99 249.89 329.60 125.31 -5,940.70 3,330.86 4.312 1,212.16 5.43 1,211.80 Pass-NOERRORS 12,525.00 8,928.14 12,625.00 8,903.50 249.88 329.59 124.07 -5,890.86 3,333.97 4.312 1,185.73 5.51 1,185.37 Pass-NOERRORS 12,525.00 8,928.14 12,650.00 8,904.75 249.88 329.60 124.16 -5,91,5.78 3,332.41 4.312 1,198.81 5.53 1,198.46 Pass-NOERRORS 12,534.17 8,928.30 12,600.00 8,902.25 249.88 329.59 122.89 -5,865.94 3,335.52 4.312 1,172.91 5.61 1,172.55 Pass-NOERRORS 12,540.44 8,928.41 12,575.00 8,901.00 249.88 329.59 122.06 -5,841.02 3,337.08 4.312 1,160.38 5.68 1,160.02 Pass-NOERRORS 12,550.00 8,928.58 12,525.00 8,898.51 249.88 329.58 120.74 -5,791.18 3,340.19 4.312 1,136.21 5.76 1,135.85 Pass-NOERRORS 12,550.00 8,928.58 12,550.00 8,899.76 249.88 329.58 120.84 -5,816.10 3,338.63 4.312 1,148.15 5.78 1,147.79 Pass-NOERRORS 12,559.79 8,928.75 12,500.00 8,897.26 249.87 329.58 119.49 -5,766.26 3,341.74 4.312 1,124.55 5.87 1,124.19 Pass-NOERRORS 12,575.00 8,929.01 12,425.00 8,893.52 249.87 329.57 117.39 -5,691.50 3,346.40 4.312 1,091.55 6.02 1,091.19 Pass-NOERRORS 12,575.00 8,929.01 12,450.00 8,894.77 249.87 329.57 117.49 -5,716.42 3,344.85 4.312 1,102.21 6.03 1,101.85 Pass-NOERRORS 12,575.00 8,929.01 12,475.00 8,896.01 249.87 329.58 117.59 -5,741.34 3,343.29 4.312 1,113.33 6.04 1,112.97 Pass-NOERRORS 12,586.93 8,929.21 12,400.00 8,892.27 249.86 329.57 115.88 -5,666.58 3,347.96 4.312 1,081.14 6.15 1,080.78 Pass-NOERRORS 12,600.00 8,929.42 12,375.00 8,891.02 249.86 329.57 114.23 -5,641.66 3,349.51 4.312 1,071.17 6.29 1,070.81 Pass-NOERRORS 13,113.97 8,898.42 12,350.00 8,889.78 249.72 329.56 142.72 -5,616.74 3,351.07 4.312 1,054.38 2.11 1,054.02 Pass-NOERRORS 13,125.00 8,897.91 12,275.00 8,886.03 249.71 329.56 141.31 -5,541.98 3,355.73 4.312 998.16 2.18 997.80 Pass-NOERRORS 13,125.00 8,897.91 12,300.00 8,887.28 249.71 329.56 141.35 -5,566.90 3,354.17 4.312 1,016.69 2.20 1,016.33 Pass-NOERRORS 13,125.00 8,897.91 12,325.00 8,888.53 249.71 329.56 141.39 -5,591.82 3,352.62 4.312 1,035.49 2.23 1,035.13 Pass-NOERRORS 13,136.14 8,897.48 12,250.00 8,884.79 249.71 329.56 139.96 -5,517.06 3,357.28 4.312 979.72 2.31 979.37 Pass-NOERRORS 13,150.00 8,897.08 12,175.00 8,881.16 249.71 329.55 138.18 -5,442.32 3,362.35 4.312 926.08 2.42 925.72 Pass-NOERRORS 13,150.00 8,897.08 12,200.00 8,882.29 249.71 329.55 138.24 -5,467.22 3,360.40 4.312 943.55 2.45 943.19 Pass-NOERRORS 13,150.00 8,897.08 12,225.00 8,883.54 249.71 329.55 138.31 -5,492.14 3,358.84 4.312 961.63 2.47 961.27 Pass-NOERRORS 13,160.91 8,896.87 12,150.00 8,880.19 249.71 329.55 136.87 -5,417.47 3,364.94 4.312 909.23 2.55 908.87 Pass-NOERRORS 13,171.00 8,896.75 12,125.00 8,879.35 249.71 329.55 135.67 -5,392.67 3,367.95 4.312 892.99 2.66 892.64 Pass-NOERRORS 13,180.80 8,896.77 12,100.00 8,877.89 249.70 329.55 135.56 -5,367.90 3,370.97 4.312 876.99 2.70 876.63 Pass-NOERRORS 13,199.04 8,897.34 12,075.00 8,875.34 249.70 329.55 135.33 -5,343.21 3,373.99 4.312 861.15 2.78 860.79 Pass-NOERRORS 13,216.83 8,898.57 12,050.00 8,871.71 249.70 329.54 134.97 -5,318.66 3,377.00 4.312 845.47 2.91 845.11 Pass-NOERRORS CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/6/2015 3:37:48PM Page 8 COMPASS 5000.1 Build 61 BP Travelling Cylinder Report HUGHES INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB X Pad MD Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: X-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore X-10A* Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: X-10A WP07 Offset TVD Reference: Offset Datum Offset Design PB X Pad- X-09-X-09B-X-09B wp04 Offset Site Error: 0.00 usft Survey Program: 96-BOSS-GYRO,9991-MWD+IFR+MS-WOCA,9994-MWD+IFR+MS-WOCA Rule Assigned:NOERRORS Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/-S +El-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) r) (usft) (usft) (in) (usft) (usft) (usft) 13,234.01 8,900.39 12,025.00 8,867.01 249.69 329.54 134.47 -5,294.30 3,380.01 4.312 830.02 3.04 829.66 Pass-NOERRORS 13,250.00 8,902.63 12,000.00 8,861.24 249.69 329.54 133.84 -5,270.16 3,383.00 4.312 814.87 3.20 814.51 Pass-NOERRORS 13,265.93 8,905.39 11,975.00 8,854.42 249.69 329.54 133.07 -5,246.29 3,385.96 4.312 800.11 3.35 799.75 Pass-NOERRORS 13,280.44 8,908.36 11,950.00 8,846.55 249.68 329.54 132.17 -5,222.75 3,388.90 4.312 785.83 3.52 785.47 Pass-NOERRORS 13,293.90 8,911.49 11,925.00 8,837.65 249.68 329.53 131.13 -5,199.57 3,391.80 4.312 772.13 3.69 771.77 Pass-NOERRORS 13,306.25 8,914.69 11,900.00 8,827.75 249.68 329.53 129.96 -5,176.80 3,394.67 4.312 759.12 3.84 758.76 Pass-NOERRORS 13,317.48 8,917.87 11,875.00 8,816.85 249.68 329.53 128.66 -5,154.48 3,397.49 4.312 746.90 3.98 746.54 Pass-NOERRORS 13,327.61 8,920.96 11,850.00 8,804.98 249.68 329.53 127.23 -5,132.65 3,400.25 4.312 735.59 4.13 735.23 Pass-NOERRORS 13,336.71 8,923.90 11,825.00 8,792.27 249.67 329.53 125.70 -5,111.30 3,402.97 4.312 725.23 4.27 724.87 Pass-NOERRORS 13,345.07 8,926.75 11,800.00 8,779.14 249.67 329.53 124.08 -5,090.19 3,405.66 5.562 715.67 4.50 715.21 Pass-NOERRORS 13,350.00 8,928.49 11,775.00 8,765.64 249.67 329.52 122.39 -5,069.32 3,408.32 5.562 706.97 4.59 706.51 Pass-NOERRORS 13,359.77 8,932.09 11,750.00 8,751.78 249.67 329.52 120.62 -5,048.68 3,410.95 5.562 699.15 4.73 698.69 Pass-NOERRORS 13,366.20 8,934.56 11,725.00 8,737.56 249.67 329.52 118.79 -5,028.28 3,413.55 5.562 692.29 4.84 691.83 Pass-NOERRORS 13,375.00 8,938.07 11,675.00 8,708.05 249.67 329.52 114.96 -4,988.25 3,418.65 5.562 681.60 5.00 681.13 Pass-NOERRORS 13,375.00 8,938.07 11,700.00 8,722.98 249.67 329.52 116.90 -5,008.14 3,416.11 5.562 686.43 4.97 685.97 Pass-NOERRORS 13,382.25 8,941.07 11,650.00 8,692.77 249.67 329.52 112.98 -4,968.62 3,421.15 5.562 677.83 5.14 677.37 Pass-NOERRORS 13,386.63 8,942.93 11,625.00 8,677.15 249.67 329.52 110.96 -4,949.26 3,423.61 5.562 675.18 5.23 674.72 Pass-NOERRORS 13,390.58 8,944.64 11,600.00 8,661.19 249.67 329.52 108.91 -4,930.17 3,426.05 5.562 673.66 5.32 673.19 Pass-NOERRORS 13,394.12 8,946.20 11,575.00 8,644.90 249.67 329.51 106.84 -4,911.36 3,428.44 5.562 673.28 5.41 672.81 Pass-NOERRORS,CC,ES 13,400.00 8,948.83 11,475.00 8,576.49 249.66 329.51 98.59 -4,839.03 3,437.65 5.562 683.34 5.65 682.88 Pass-NOERRORS 13,400.00 8,948.83 11,500.00 8,594.06 249.66. 329.51 100.64 -4,856.67 3,435.41 5.562 679.09 5.60 678.62 Pass-NOERRORS 13,400.00 8,948.83 11,525.00 8,611.33 249.66 329.51 102.70 -4,874.60 3,433.12 5.562 675.99 5.56 675.53 Pass-NOERRORS 13,400.00 8,948.83 11,550.00 8,628.27 249.66 329.51 104.77 -4,892.84 3,430.80 5.562 674.06 5.52 673.60 Pass-NOERRORS 13,406.68 8,951.91 11,450.00 8,558.60 249.66 329.51 96.57 -4,821.70 3,439.86 5.562 688.66 5.78 688.20 Pass-NOERRORS 13,408.30 8,952.67 11,425.00 8,540.42 249.66 329.51 94.59 -4,804.68 3,442.03 5.562 695.12 5.84 694.65 Pass-NOERRORS 13,409.68 8,953.32 11,400.00 8,521.94 249.66 329.51 92.65 -4,787.98 3,444.16 5.562 702.64 5.90 702.18 Pass-NOERRORS 13,410.93 8,953.91 11,375.00 8,503.36 249.66 329.51 90.75 -4,771.39 3,446.27 5.562 711.04 5.97 710.58 Pass-NOERRORS 13,412.13 8,954.48 11,350.00 8,484.78 249.66 329.50 88.90 -4,754.79 3,448.38 5.562 720.21 6.03 719.74 Pass-NOERRORS 13,413.28 8,955.03 11,325.00 8,466.21 249.66 329.50 87.10 -4,738.20 3,450.50 5.562 730.11 6.09 729.65 Pass-NOERRORS 13,414.37 8,955.56 11,300.00 8,447.63 249.66 329.50 85.34 -4,721.60 3,452.61 5.562 740.72 6.15 740.26 Pass-NOERRORS 13,415.43 8,956.06 11,275.00 8,429.05 249.66 329.50 83.64 -4,705.01 3,454.73 5.562 752.01 6.20 751.55 Pass-NOERRORS 13,416.44 8,956.55 11,250.00 8,410.47 249.66 329.50 81.99 -4,688.42 3,456.84 5.562 763.95 6.26 763.49 Pass-NOERRORS 13,417.41 8,957.02 11,225.00 8,391.89 249.66 329.50 80.39 -4,671.82 3,458.95 5.562 776.51 6.32 776.04 Pass-NOERRORS 13,425.00 8,960.77 10,550.00 7,890.27 249.66 329.49 53.26 -4,223.78 3,516.02 5.562 1,263.71 7.71 1,263.25 Pass-NOERRORS 13,425.00 8,960.77 10,575.00 7,908.85 249.66 329.49 53.86 -4,240.37 3,513.91 5.562 1,242.54 7.67 1,242.08 Pass-NOERRORS 13,425.00 8,960.77 10,600.00 7,927.43 249.66 329.49 54.49 -4,256.97 3,511.80 5.562 1,221.52 7.62 1,221.05 Pass-NOERRORS 13,425.00 8,960.77 10,625.00 7,946.00 249.66 329.49 55.13 -4,273.56 3,509.68 5.562 1,200.64 7.57 1,200.18 Pass-NOERRORS 13,425.00 8,960.77 10,650.00 7,964.58 249.66 329.49 55.80 -4,290.16 3,507.57 5.562 1,179.93 7.52 1,179.46 Pass-NOERRORS 13,425.00 8,960.77 10,675.00 7,983.16 249.66 329.49 56.50 -4,306.75 3,505.46 5.562 1,159.38 7.47 1,158.92 Pass-NOERRORS 13,425.00 8,960.77 10,700.00 8,001.74 249.66 329.49 57.22 -4,323.34 3,503.34 5.562 1,139.02 7.43 1,138.55 Pass-NOERRORS 13,425.00 8,960.77 10,725.00 8,020.32 249.66 329.49 57.96 -4,339.94 3,501.23 5.562 1,118.84 7.38 1,118.38 Pass-NOERRORS 13,425.00 8,960.77 10,750.00 8,038.90 249.66 329.49 58.74 -4,356.53 3,499.11 5.562 1,098.86 7.33 1,098.39 Pass-NOERRORS 13,425.00 8,960.77 10,775.00 8,057.48 249.66 329.49 59.54 -4,373.13 3,497.00 5.562 1,079.09 7.28 1,078.62 Pass-NOERRORS 13,425.00 8,960.77 10,800.00 8,076.05 249.66 329.49 60.37 -4,389.72 3,494.89 5.562 1,059.54 7.23 1,059.07 Pass-NOERRORS 13,425.00 8,960.77 10,825.00 8,094.63 249.66 329.49 61.23 -4,406.31 3,492.77 5.562 1,040.22 7.18 1,039.76 Pass-NOERRORS 13,425.00 8,960.77 10,850.00 8,113.21 249.66 329.49 62.12 -4,422.91 3,490.66 5.562 1,021.15 7.14 1,020.69 Pass-NOERRORS 13,425.00 8,960.77 10,875.00 8,131.79 249.66 329.49 63.05 -4,439.50 3,488.55 5.562 1,002.34 7.09 1,001.88 Pass-NOERRORS CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/6/2015 3:37:48PM Page 9 COMPASS 5000.1 Build 61 • BP BAKER NM ... 0by Travelling Cylinder Report HUGHES INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB X Pad MD Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: X-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore X-10A* Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: X-10A WP07 Offset TVD Reference: Offset Datum Offset Design PB X Pad- X-09-X-09B-X-09B wp04 Offset Site Error: 0.00 usft Survey Program: 96-BOSS-GYRO,9991-MWD+IFR+MS-WOCA,9994-MWD+IFR+MS-WOCA Rule Assigned:NOERRORS Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/-S +EI-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) t°) (usft) (usft) (In) (usft) (usft) (usft) 13,425.00 8,960.77 10,900.00 8,150.37 249.66 329.49 64.01 -4,456.10 3,486.43 5.562 983.81 7.04 983.35 Pass-NOERRORS 13,425.00 8,960.77 10,925.00 8,168.95 249.66 329.49 65.01 -4,472.69 3,484.32 5.562 965.57 6.99 965.10 Pass-NOERRORS 13,425.00 8,960.77 10,950.00 8,187.53 249.66 329.49 66.05 -4,489.29 3,482.20 5.562 947.63 6.94 947.17 Pass-NOERRORS 13,425.00 8,960.77 10,975.00 8,206.10 249.66 329.49 67.13 -4,505.88 3,480.09 5.562 930.03 6.89 929.56 Pass-NOERRORS 13,425.00 8,960.77 11,000.00 8,224.68 249.66 329.49 68.25 -4,522.47 3,477.98 5.562 912.76 6.84 912.30 Pass-NOERRORS 13,425.00 8,960.77 11,025.00 8,243.26 249.66 329.49 69.41 -4,539.07 3,475.86 5.562 895.87 6.79 895.40 Pass-NOERRORS 13,425.00 8,960.77 11,050.00 8,261.84 249.66 329.50 70.61 -4,555.66 3,473.75 5.562 879.36 6.74 878.89 Pass-NOERRORS 13,425.00 8,960.77 11,075.00 8,280.42 249.66 329.50 71.86 -4,572.26 3,471.64 5.562 863.25 6.69 862.79 Pass-NOERRORS 13,425.00 8,960.77 11,100.00 8,299.00 249.66 329.50 73.16 -4,588.85 3,469.52 5.562 847.58 6.64 847.12 Pass-NOERRORS 13,425.00 8,960.77 11,125.00 8,317.58 249.66 329.50 74.51 -4,605.44 3,467.41 5.562 832.37 6.59 831.91 Pass-NOERRORS 13,425.00 8,960.77 11,150.00 8,336.15 249.66 329.50 75.90 -4,622.04 3,465.29 5.562 817.64 6.55 817.17 Pass-NOERRORS 13,425.00 8,960.77 11,175.00 8,354.73 249.66 329.50 77.35 -4,638.63 3,463.18 5.562 803.41 6.50 802.95 Pass-NOERRORS 13,425.00 8,960.77 11,200.00 8,373.31 249.66 329.50 78.85 -4,655.23 3,461.07 5.562 789.72 6.46 789.26 Pass-NOERRORS 13,434.43 8,965.57 10,525.00 7,871.69 249.66 329.49 52.67 -4,207.18 3,518.14 5.562 1,284.89 7.88 1,284.43 Pass-NOERRORS 13,434.82 8,965.77 10,500.00 7,853.11 249.66 329.48 52.10 -4,190.59 3,520.25 5.562 1,306.32 7.93 1,305.86 Pass-NOERRORS 13,434.92 8,965.82 10,225.00 7,649.32 249.66 329.48 46.28 -4,007.56 3,518.31 5.562 1,539.28 8.42 1,538.81 Pass-NOERRORS 13,435.19 8,965.96 10,475.00 7,834.53 249.66 329.48 51.55 -4,174.00 3,522.37 5.562 1,327.88 7.98 1,327.41 Pass-NOERRORS 13,435.47 8,966.10 10,250.00 7,667.59 249.66 329.48 46.83 -4,024.13 3,522.38 5.562 1,519.25 8.39 1,518.78 Pass-NOERRORS 13,435.56 8,966.15 10,450.00 7,815.95 249.66 329.48 51.02 -4,157.40 3,524.48 5.562 1,349.55 8.03 1,349.09 Pass-NOERRORS 13,435.90 8,966.33 10,275.00 7,685.98 249.66 329.48 47.38 -4,040.76 3,525.58 5.562 1,498.91 8.35 1,498.45 Pass-NOERRORS 13,435.91 8,966.33 10,425.00 7,797.37 249.66 329.48 50.51 -4,140.81 3,526.59 5.562 1,371.34 8.09 1,370.87 Pass-NOERRORS 13,436.22 8,966.50 10,300.00 7,704.45 249.66 329.48 47.92 -4,057.44 3,527.91 5.562 1,478.29 8.32 1,477.82 Pass-NOERRORS 13,436.24 8,966.50 10,400.00 7,778.79 249.66 329.48 50.01 4,124.20 3,528.55 5.562 1,393.17 8.14 1,392.71 Pass-NOERRORS 13,436.42 8,966.60 10,325.00 7,722.99 249.66 329.48 48.45 -4,074.14 3,529.38 5.562 1,457.39 8.27 1,456.92 Pass-NOERRORS 13,436.43 8,966.60 10,375.00 7,760.18 249.66 329.48 49.50 -4,107.54 3,529.70 5.562 1,414.81 8.18 1,414.35 Pass-NOERRORS 13,436.49 8,966.64 10,350.00 7,741.58 249.66 329.48 48.98 -4,090.85 3,529.97 5.562 1,436.22 8.23 1,435.76 Pass-NOERRORS CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/6/2015 3:37:48PM Page 10 COMPASS 5000.1 Build 61 i BP Mill • 0 by Travelling Cylinder Report HUGHES INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB X Pad MD Reference: 12: 10 7/6/1980 00:00 Q 74.94usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: X-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore X-10A* Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: X-10A WP07 Offset TVD Reference: Offset Datum Offset Design PB X Pad- X-10-X-10-X-10 Offset Site Error: 0.00 usft Survey Program: 100-BOSS-GYRO Rule Assigned:NOERRORS Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NI-5 +EI-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (in) (usft) (usft) (usft) 10,725.00 8,907.63 10,725.00 8,907.67 0.28 0.85 22.30 -4,424.87 1,644.62 3.500 0.07 0.46 -0.40 FAIL-NOERRORS,CC,ES 10,749.90 8,927.10 10,750.00 8,927.97 0.28 1.69 21.34 -4,438.63 1,639.79 3.500 1.32 1.62 -0.30 FAIL-NOERRORS 10,774.11 8,944.08 10,775.00 8,948.31 0.28 2.54 20.79 -4,452.36 1,635.02 3.500 5.60 3.23 2.37 Pass-NOERRORS 10,796.92 8,957.98 10,800.00 8,968.68 0.28 3.38 20.62 -4,466.07 1,630.30 3.500 12.93 4.71 8.22 Pass-NOERRORS 10,817.86 8,968.75 10,825.00 8,989.08 0.29 4.22 20.56 -4,479.75 1,625.64 3.500 23.00 6.02 16.98 Pass-NOERRORS 10,836.69 8,976.71 10,850.00 9,009.50 0.29 5.06 20.53 -4,493.41 1,621.04 3.500 35.42 7.14 28.28 Pass-NOERRORS 10,853.40 8,982.33 10,875.00 9,029.95 0.29 5.90 20.53 -4,507.06 1,616.48 3.500 49.85 8.09 41.76 Pass-NOERRORS 10,868.10 8,986.13 10,900.00 9,050.42 0.29 6.74 20.54 -4,520.68 1,611.98 3.500 65.93 8.87 57.06 Pass-NOERRORS 10,880.00 8,988.40 10,925.00 9,070.91 0.29 7.58 20.56 -4,534.29 1,607.53 3.500 83.39 9.47 73.92 Pass-NOERRORS 10,892.26 8,989.97 10,950.00 9,091.42 0.29 8.42 20.58 -4,547.89 1,603.12 3.500 101.94 10.05 91.89 Pass-NOERRORS 10,902.15 8,990.67 10,975.00 9,111.95 0.29 9.26 20.60 -4,561.48 1,598.75 3.500 121.43 10.49 110.94 Pass-NOERRORS 'I 10,910.67 8,990.86 11,000.00 9,132.49 0.29 10.09 20.62 -4,575.05 1,594.43 3.500 141.67 10.85 130.82 Pass-NOERRORS ! 10,920.00 8,990.63 11,025.00 9,153.06 0.30 10.93 20.65 -4,588.61 1,590.16 3.500 162.55 11.22 151.33 Pass-NOERRORS 10,925.30 8,990.30 11,050.00 9,173.64 0.30 11.76 20.70 -4,602.17 1,585.97 3.500 183.93 11.41 172.52 Pass-NOERRORS 10,930.00 8,989.88 11,075.00 9,194.25 0.30 12.60 20.75 -4,615.71 1,581.85 3.500 205.77 11.58 194.19 Pass-NOERRORS 10,936.72 8,989.08 11,100.00 9,214.87 0.30 13.44 20.80 -4,629.25 1,577.80 3.500 227.96 11.81 216.16 Pass-NOERRORS 10,940.00 8,988.61 11,125.00 9,235.50 0.30 14.27 20.86 -4,642.79 1,573.82 3.500 250.49 11.92 238.57 Pass-NOERRORS 10,945.89 8,987.62 11,150.00 9,256.15 0.30 15.11 20.92 -4,656.34 1,569.91 3.500 273.25 12.10 261.15 Pass-NOERRORS 10,950.00 8,986.82 11,175.00 9,276.80 0.30 15.95 20.98 -4,669.89 1,566.05 3.500 296.25 12.22 284.03 Pass-NOERRORS 10,953.40 8,986.09 11,200.00 9,297.45 0.30 16.79 21.04 -4,683.45 1,562.26 3.500 319.44 12.32 307.13 Pass-NOERRORS 10,957.81 8,985.08 11,225.00 9,318.12 0.30 17.63 21.38 -4,697.02 1,558.52 3.500 342.80 12.39 330.41 Pass-NOERRORS 10,966.37 8,983.06 11,250.00 9,338.80 0.30 18.47 22.76 -4,710.57 1,554.83 3.500 366.21 12.39 353.83 Pass-NOERRORS 10,975.00 8,981.04 11,275.00 9,359.49 0.30 19.31 24.17 -4,724.13 1,551.18 3.500 389.64 12.39 377.25 Pass-NOERRORS 10,983.29 8,979.09 11,300.00 9,380.19 0.31 20.15 25.55 4,737.67 1,547.58 3.500 413.08 12.38 400.69 Pass-NOERRORS 10,991.60 8,977.14 11,325.00 9,400.91 0.31 20.99 26.94 -4,751.19 1,544.04 3.500 436.55 12.38 424.16 Pass-NOERRORS 11,000.00 8,975.17 11,350.00 9,421.69 0.31 21.82 28.36 -4,764.66 1,540.54 3.500 460.05 12.38 447.66 Pass-NOERRORS 11,007.82 8,973.34 11,375.00 9,442.50 0.31 22.65 29.69 -4,778.08 1,537.11 3.500 483.59 12.37 471.19 Pass-NOERRORS 11,015.71 8,971.50 11,400.00 9,463.35 0.31 23.49 31.04 4,791.45 1,533.73 3.500 507.16 12.36 494.76 Pass-NOERRORS 11,023.50 8,969.68 11,425.00 9,484.22 0.31 24.32 32.38 4,804.81 1,530.42 3.500 530.75 12.37 518.34 Pass-NOERRORS 11,031.20 8,967.89 11,450.00 9,505.08 0.31 25.15 33.71 -4,818.21 1,527.21 3.500 554.34 12.38 541.93 Pass-NOERRORS 11,043.03 8,965.17 11,475.00 9,525.92 0.31 25.99 33.63 -4,831.64 1,524.04 3.500 577.93 12.35 565.55 Pass-NOERRORS 11,063.59 8,960.69 11,500.00 9,546.77 0.32 26.83 30.94 -4,845.07 1,520.86 3.500 601.40 12.24 589.13 Pass-NOERRORS 11,086.94 8,956.02 11,525.00 9,567.62 0.32 27.67 27.89 -4,858.50 1,517.69 3.500 624.67 12.13 612.53 Pass-NOERRORS 11,113.54 8,951.27 11,550.00 9,588.47 0.32 28.51 24.46 4,871.93 1,514.52 3.500 647.72 12.00 635.73 Pass-NOERRORS 11,119.30 8,950.32 11,555.00 9,592.63 0.33 28.67 23.72 -4,874.62 1,513.88 3.500 652.29 11.97 640.35 Pass-NOERRORS CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/6/2015 3:37:48PM Page 11 COMPASS 5000.1 Build 61 • Egg KR • 0by Travelling CylinderBP Report HUGHIES INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB X Pad MD Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: X-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore X-10A* Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: X-10A WP07 Offset TVD Reference: Offset Datum Offset Design PB X Pad- X-30-X-30-X-30 Offset Site Error: 0.00 usft Survey Program: 200-MWD,11627-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toofface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NiS +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (in) (usft) (usft) (usft) 11,500.00 8,928.57 10,175.00 7,970.88 249.62 73.93 -152.49 -5,579.71 400.81 4.812 1,540.05 999.63 749.65 Pass-MajorRisk 11,500.00 8,928.57 10,200.00 7,989.98 249.62 74.14 -151.81 -5,595.66 403.20 4.812 1,531.27 1,000.27 733.54 Pass-MajorRisk 11,500.00 8,928.57 10,225.00 8,009.09 249.62 74.35 -151.13 -5,611.61 405.55 4.812 1,522.86 1,000.91 717.80 Pass-Major Risk 11,508.97 8,928.26 10,250.00 8,028.19 249.62 74.56 -151.54 -5,627.58 407.82 4.812 1,514.79 999.10 704.13 Pass-Major Risk 11,516.00 8,928.02 10,275.00 8,047.18 249.63 74.77 -151.71 -5,643.71 409.81 4.812 1,507.42 997.59 690.99 Pass-Major Risk 11,516.00 8,928.02 10,300.00 8,066.05 249.63 74.98 -150.98 -5,660.03 411.48 4.812 1,500.73 998.22 676.93 Pass-Major Risk 11,520.67 8,927.88 10,325.00 8,084.79 249.63 75.18 -150.72 -5,676.52 412.85 4.812 1,494.76 997.56 665.04 Pass-Major Risk 11,525.00 8,927.76 10,350.00 8,103.38 249.63 75.41 -150.42 -5,693.19 414.03 4.812 1,489.45 996.97 653.80 Pass-MajorRisk 11,525.00 8,927.76 10,375.00 8,121.81 249.63 75.64 -149.68 -5,710.05 415.19 4.812 1,484.69 997.64 641.83 Pass-MajorRisk 11,525.00 8,927.76 10,400.00 8,140.06 249.63 75.86 -148.93 -5,727.09 416.34 4.812 1,480.51 998.31 630.57 Pass-Major Risk 11,535.51 8,927.58 10,425.00 8,158.13 249.64 76.09 -149.25 -5,744.33 417.46 4.812 1,476.78 995.72 623.53 Pass-Major Risk 11,539.35 8,927.55 10,450.00 8,176.04 249.64 76.32 -148.89 -5,761.74 418.47 4.812 1,473.72 995.14 615.05 Pass-Major Risk 11,550.00 8,927.54 10,475.00 8,193.80 249.64 76.56 -149.20 -5,779.32 419.31 4.812 1,471.38 992.07 610.21 Pass-Major Risk 11,550.00 8,927.54 10,500.00 8,211.40 249.64 76.80 -148.45 -5,797.06 419.98 4.812 1,469.57 992.75 601.80 Pass-Major Risk 11,550.00 8,927.54 10,525.00 8,228.84 249.64 77.03 -147.70 -5,814.97 420.51 4.812 1,468.45 993.44 594.20 Pass-Major Risk 11,555.01 8,927.58 10,550.00 8,246.13 249.65 77.28 -147.45 -5,833.01 421.01 4.812 1,467.87 992.25 589.43 Pass-Major Risk 11,561.00 8,927.67 10,575.00 8,263.27 249.65 77.52 -147.30 -5,851.20 421.52 4.812 1,467.81 990.60 585.87 Pass-Major Risk,CC 11,561.00 8,927.67 10,600.00 8,280.27 249.65 77.76 -146.56 -5,869.53 422.03 4.812 1,468.25 991.29 580.33 Pass-Major Risk '. 11,567.55 8,927.80 10,625.00 8,297.10 249.65 78.01 -146.60 -5,888.01 422.46 4.812 1,469.27 988.72 578.31 Pass-Major Risk 11,575.00 8,927.94 10,650.00 8,313.74 249.66 78.26 -146.74 -5,906.66 422.62 4.812 1,471.05 985.47 577.83 Pass-Major Risk 11,575.00 8,927.94 10,675.00 8,330.19 249.66 78.51 -146.00 -5,925.49 422.50 4.812 1,473.56 986.16 574.81 Pass-Major Risk 11,575.00 8,927.94 10,700.00 8,346.45 249.66 78.76 -145.27 -5,944.48 422.12 4.812 1,476.85 986.85 572.74 Pass-Major Risk,ES,SF 11,584.44 8,928.11 10,725.00 8,362.51 249.66 79.00 -145.66 -5,963.63 421.52 4.812 1,480.76 982.19 576.18 Pass-Major Risk 11,588.55 8,928.19 10,750.00 8,378.39 249.67 79.25 -145.42 5,982.92 420.75 4.812 1,485.35 980.42 577.96 Pass-Major Risk 11,600.00 8,928.41 10,775.00 8,394.07 249.67 79.50 -146.06 -6,002.37 419.82 4.812 1,490.65 973.91 584.92 Pass-Major Risk 11,600.00 8,928.41 10,800.00 8,409.57 249.67 79.76 -145.35 -6,021.96 418.72 4.812 1,496.44 974.57 586.10 Pass-Major Risk 11,600.00 8,928.41 10,825.00 8,424.86 249.67 80.01 -144.65 -6,041.69 417.51 4.812 1,502.87 975.24 588.08 Pass-Major Risk 11,600.00 8,928.41 10,850.00 8,439.96 249.67 80.27 -143.96 -6,061.58 416.19 4.812 1,509.90 975.90 590.86 Pass-Major Risk 11,600.00 8,928.41 10,875.00 8,454.85 249.67 80.53 -143.28 -6,081.60 414.77 4.812 1,517.54 976.57 594.42 Pass-Major Risk 11,612.36 8,928.65 10,900.00 8,469.55 249.68 80.79 -144.07 -6,101.77 413.25 4.812 1,525.57 968.84 606.28 Pass-Major Risk 11,625.00 8,928.90 10,925.00 8,484.04 249.69 81.06 -144.90 -6,122.08 411.62 4.812 1,534.34 960.26 619.96 Pass-Major Risk 11,625.00 8,928.90 10,950.00 8,498.33 249.69 81.32 -144.25 -6,142.52 409.89 4.812 1,543.47 960.92 625.57 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/6/2015 3:37:48PM Page 12 COMPASS 5000.1 Build 61 z BP 11E1111 N 0 by Travelling Cylinder Report R HUGIHES I NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB X Pad MD Reference: 12: 10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: X-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore X-10A* Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: X-10A WP07 Offset TVD Reference: Offset Datum Offset Design PB X Pad- X-30-X-30A-Plan#13 Offset Site Error: 0.00 usft Survey Program: 200-MWD,11627-MWD,12880-MWD,12946-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/-S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (1 (usft) (usft) (in) (usft) (usft) (usft) 11,500.00 8,928.57 10,175.00 7,970.88 249.62 73.89 -152.49 -5,579.71 400.81 4.812 1,540.05 999.44 749.75 Pass-Major Risk 11,500.00 8,928.57 10,200.00 7,989.98 249.62 74.09 -151.81 -5,595.66 403.20 4.812 1,531.27 1,000.08 733.64 Pass-Major Risk 11,500.00 8,928.57 10,225.00 8,009.09 249.62 74.30 -151.13 -5,611.61 405.55 4.812 1,522.86 1,000.71 717.91 Pass-Major Risk 11,508.97 8,928.26 10,250.00 8,028.19 249.62 74.51 -151.54 -5,627.58 407.82 4.812 1,514.79 998.91 704.23 Pass-Major Risk 11,516.00 8,928.02 10,275.00 8,047.18 249.63 74.72 -151.71 -5,643.71 409.81 4.812 1,507.42 997.39 691.09 Pass-Major Risk 11,516.00 8,928.02 10,300.00 8,066.05 249.63 74.93 -150.98 -5,660.03 411.48 4.812 1,500.73 998.03 677.03 Pass-Major Risk 11,520.67 8,927.88 10,325.00 8,084.79 249.63 75.14 -150.72 -5,676.52 412.85 4.812 1,494.76 997.37 665.14 Pass-Major Risk 11,525.00 8,927.76 10,350.00 8,103.38 249.63 75.36 -150.42 -5,693.19 414.03 4.812 1,489.45 996.78 653.90 Pass-Major Risk 11,525.00 8,927.76 10,375.00 8,121.81 249.63 75.59 -149.68 -5,710.05 415.19 4.812 1,484.69 997.45 641.94 Pass-Major Risk 11,525.00 8,927.76 10,400.00 8,140.06 249.63 75.81 -148.93 -5,727.09 416.34 4.812 1,480.51 998.12 630.68 Pass-Major Risk 11,535.51 8,927.58 10,425.00 8,158.13 249.64 76.04 -149.25 -5,744.33 417.46 4.812 1,476.78 995.53 623.64 Pass-Major Risk 11,539.35 8,927.55 10,450.00 8,176.04 249.64 76.28 -148.89 -5,761.74 418.47 4.812 1,473.72 994.94 615.16 Pass-Major Risk 11,550.00 8,927.54 10,475.00 8,193.80 249.64 76.51 -149.20 -5,779.32 419.31 4.812 1,471.38 991.88 610.32 Pass-MajorRisk 11,550.00 8,927.54 10,500.00 8,211.40 249.64 76.75 -148.45 -5,797.06 419.98 4.812 1,469.57 992.56 601.91 Pass-Major Risk 11,550.00 8,927.54 10,525.00 8,228.84 249.64 76.99 -147.70 -5,814.97 420.51 4.812 1,468.45 993.25 594.31 Pass-Major Risk 11,555.01 8,927.58 10,550.00 8,246.13 249.65 77.23 -147.45 -5,833.01 421.01 4.812 1,467.87 992.06 589.55 Pass-Major Risk 11,561.00 8,927.67 10,575.00 8,263.27 249.65 77.47 -147.30 -5,851.20 421.52 4.812 1,467.81 990.40 585.99 Pass-Major Risk,CC 11,561.00 8,927.67 10,600.00 8,280.27 249.65 77.72 -146.56 -5,869.53 422.03 4.812 1,468.25 991.10 580.44 Pass-Major Risk 11,567.55 8,927.80 10,625.00 8,297.10 249.65 77.96 -146.60 -5,888.01 422.46 4.812 1,469.27 988.52 578.43 Pass-Major Risk 11,575.00 8,927.94 10,650.00 8,313.74 249.66 78.21 -146.74 -5,906.66 422.62 4.812 1,471.05 985.28 577.94 Pass-Major Risk 11,575.00 8,927.94 10,675.00 8,330.19 249.66 78.46 -146.00 -5,925.49 422.50 4.812 1,473.56 985.97 574.92 Pass-Major Risk 11,575.00 8,927.94 10,700.00 8,346.45 249.66 78.71 -145.27 -5,944.48 422.12 4.812 1,476.85 986.66 572.86 Pass-Major Risk,ES,SF 11,584.44 8,928.11 10,725.00 8,362.51 249.66 78.96 -145.66 -5,963.63 421.52 4.812 1,480.76 982.00 576.30 Pass-Major Risk 11,588.55 8,928.19 10,750.00 8,378.39 249.67 79.21 -145.42 -5,982.92 420.75 4.812 1,485.35 980.22 578.07 Pass-Major Risk 11,600.00 8,928.41 10,775.00 8,394.07 249.67 79.45 -146.06 -6,002.37 419.82 4.812 1,490.65 973.72 585.04 Pass-Major Risk 11,600.00 8,928.41 10,800.00 8,409.57 249.67 79.71 -145.35 -6,021.96 418.72 4.812 1,496.44 974.38 586.22 Pass-Major Risk 11,600.00 8,928.41 10,825.00 8,424.86 249.67 79.96 -144.65 -6,041.69 417.51 4.812 1,502.87 975.04 588.20 Pass-Major Risk 11,600.00 8,928.41 10,850.00 8,439.96 249.67 80.22 -143.96 -6,061.58 416.19 4.812 1,509.90 975.71 590.98 Pass-Major Risk 11,600.00 8,928.41 10,875.00 8,454.85 249.67 80.48 -143.28 -6,081.60 414.77 4.812 1,517.54 976.38 594.54 Pass-MajorRisk 11,612.36 8,928.65 10,900.00 8,469.55 249.68 80.74 -144.07 -6,101.77 413.25 4.812 1,525.57 968.66 606.40 Pass-Major Risk 11,625.00 8,928.90 10,925.00 8,484.04 249.69 81.01 -144.90 -6,122.08 411.62 4.812 1,534.34 960.08 620.07 Pass-Major Risk 11,625.00 8,928.90 10,950.00 8,498.33 249.69 81.27 -144.25 -6,142.52 409.89 4.812 1,543.47 960.73 625.69 Pass-MajorRisk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/6/2015 3:37:48PM Page 13 COMPASS 5000.1 Build 61 BP EMI , 0 bp Travelling Cylinder Report s 11KGHES INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB X Pad MD Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: X-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore X-10A* Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: X-10A WP07 Offset TVD Reference: Offset Datum Offset Design PB X Pad- X-30-X-30A-X-30A Offset Site Error: 0.00 usft Survey Program: 200-MWD,11627-MWD,12880-MWD,12973-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NI-S +EI-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (1 (usft) (usft) (in) (usft) (usft) (usft) 11,500.00 8,928.57 10,175.00 7,970.88 249.62 73.89 -152.49 -5,579.71 400.81 4.812 1,540.05 999.44 749.75 Pass-Major Risk 11,500.00 8,928.57 10,200.00 7,989.98 249.62 74.09 -151.81 -5,595.66 403.20 4.812 1,531.27 1,000.08 733.64 Pass-Major Risk 11,500.00 8,928.57 10,225.00 8,009.09 249.62 74.30 -151.13 -5,611.61 405.55 4.812 1,522.86 1,000.71 717.91 Pass-Major Risk 11,508.97 8,928.26 10,250.00 8,028.19 249.62 74.51 -151.54 -5,627.58 407.82 4.812 1,514.79 998.91 704.23 Pass-Major Risk 11,516.00 8,928.02 10,275.00 8,047.18 249.63 74.72 -151.71 -5,643.71 409.81 4.812 1,507.42 997.39 691.09 Pass-Major Risk 11,516.00 8,928.02 10,300.00 8,066.05 249.63 74.93 -150.98 -5,660.03 411.48 4.812 1,500.73 998.03 677.03 Pass-Major Risk 11,520.67 8,927.88 10,325.00 8,084.79 249.63 75.14 -150.72 -5,676.52 412.85 4.812 1,494.76 997.37 665.14 Pass-Major Risk 11,525.00 8,927.76 10,350.00 8,103.38 249.63 75.36 -150.42 -5,693.19 414.03 4.812 1,489.45 996.78 653.90 Pass-Major Risk 11,525.00 8,927.76 10,375.00 8,121.81 249.63 75.59 -149.68 -5,710.05 415.19 4.812 1,484.69 997.45 641.94 Pass-Major Risk 11,525.00 8,927.76 10,400.00 8,140.06 249.63 75.81 -148.93 -5,727.09 416.34 4.812 1,480.51 998.12 630.68 Pass-Major Risk 11,535.51 8,927.58 10,425.00 8,158.13 249.64 76.04 -149.25 -5,744.33 417.46 4.812 1,476.78 995.53 623.64 Pass-Major Risk 11,539.35 8,927.55 10,450.00 8,176.04 249.64 76.28 -148.89 -5,761.74 418.47' 4.812 1,473.72 994.94 615.16 Pass-Major Risk 11,550.00 8,927.54 10,475.00 8,193.80 249.64 76.51 -149.20 -5,779.32 419.31 4.812 1,471.38 991.88 610.32 Pass-Major Risk 11,550.00 8,927.54 10,500.00 8,211.40 249.64 76.75 -148.45 -5,797.06 419.98 4.812 1,469.57 992.56 601.91 Pass-Major Risk 11,550.00 8,927.54 10,525.00 8,228.84 249.64 76.99 -147.70 -5,814.97 420.51 4.812 1,468.45 993.25 594.31 Pass-Major Risk 11,555.01 8,927.58 10,550.00 8,246.13 249.65 77.23 -147.45 -5,833.01 421.01 4.812 1,467.87 992.06 589.55 Pass-Major Risk 11,561.00 8,927.67 10,575.00 8,263.27 249.65 77.47 -147.30 -5,851.20 421.52 4.812 1,467.81 990.40 585.99 Pass-Major Risk,CC 11,561.00 8,927.67 10,600.00 8,280.27 249.65 77.72 -146.56 -5,869.53 422.03 4.812 1,468.25 991.10 580.44 Pass-Major Risk 11,567.55 8,927.80 10,625.00 8,297.10 249.65 77.96 -146.60 -5,888.01 422.46 4.812 1,469.27 988.52 578.43 Pass-Major Risk 11,575.00 8,927.94 10,650.00 8,313.74 249.66 78.21 -146.74 -5,906.66 422.62 4.812 1,471.05 985.28 577.94 Pass-Major Risk 11,575.00 8,927.94 10,675.00 8,330.19 249.66 78.46 -146.00 -5,925.49 422.50 4.812 1,473.56 985.97 574.92 Pass-Major Risk 11,575.00 8,927.94 10,700.00 8,346.45 249.66 78.71 -145.27 -5,944.48 422.12 4.812 1,476.85 986.66 572.86 Pass-Major Risk,ES,SF 11,584.44 8,928.11 10,725.00 8,362.51 249.66 78.96 -145.66 -5,963.63 421.52 4.812 1,480.76 982.00 576.30 Pass-Major Risk 11,588.55 8,928.19 10,750.00 8,378.39 249.67 79.21 -145.42 -5,982.92 420.75 4.812 1,485.35 980.22 578.07 Pass-Major Risk 11,600.00 8,928.41 10,775.00 8,394.07 249.67 79.45 -146.06 -6,002.37 419.82 4.812 1,490.65 973.72 585.04 Pass-Major Risk 11,600.00 8,928.41 10,800.00 8,409.57 249.67 79.71 -145.35 -6,021.96 418.72 4.812 1,496.44 974.38 586.22 Pass-Major Risk 11,600.00 8,928.41 10,825.00 8,424.86 249.67 79.96 -144.65 -6,041.69 417.51 4.812 1,502.87 975.04 588.20 Pass-Major Risk 11,600.00 8,928.41 10,850.00 8,439.96 249.67 80.22 -143.96 -6,061.58 416.19 4.812 1,509.90 975.71 590.98 Pass-Major Risk 11,600.00 8,928.41 10,875.00 8,454.85 249.67 80.48 -143.28 -6,081.60 414.77 4.812 1,517.54 976.38 594.54 Pass-Major Risk 11,612.36 8,928.65 10,900.00 8,469.55 249.68 80.74 -144.07 -6,101.77 413.25 4.812 1,525.57 968.66 606.40 Pass-Major Risk 11,625.00 8,928.90 10,925.00 8,484.04 249.69 81.01 -144.90 -6,122.08 411.62 4.812 1,534.34 960.08 620.07 Pass-Major Risk 11,625.00 8,928.90 10,950.00 8,498.33 249.69 81.27 -144.25 -6,142.52 409.89 4.812 1,543.47 960.73 625.69 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/6/2015 3:37:48PM Page 14 COMPASS 5000.1 Build 61 BP Mill . (>()bp Travelling Cylinder Report BAKER INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB X Pad MD Reference: 12: 10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: X-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore X-10A* Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: X-10A WP07 Offset TVD Reference: Offset Datum Offset Design PB X Pad- X-30-X-30APB1-Plan#11 Offset Site Error: 0.00 usft Survey Program: 200-MWD,11627-MWD,12861-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NI-S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (1 (usft) (usft) (in) (usft) (usft) (usft) 11,500.00 8,928.57 10,175.00 7,970.88 249.62 73.90 -152.49 -5,579.71 400.81 3.656 1,540.05 999.40 749.82 Pass-Major Risk 11,500.00 8,928.57 10,200.00 7,989.98 249.62 74.11 -151.81 -5,595.66 403.20 3.656 1,531.27 1,000.04 733.70 Pass-Major Risk 11,500.00 8,928.57 10,225.00 8,009.09 249.62 74.32 -151.13 -5,611.61 405.55 3.656 1,522.86 1,000.68 717.97 Pass-Major Risk ., 11,508.97 8,928.26 10,250.00 8,028.19 249.62 74.53 -151.54 -5,627.58 407.82 3.656 1,514.79 998.87 704.29 Pass-Major Risk 11,516.00 8,928.02 10,275.00 8,047.18 249.63 74.73 -151.71 -5,643.71 409.81 3.656 1,507.42 997.36 691.15 Pass-MajorRisk 11,516.00 8,928.02 10,300.00 8,066.05 249.63 74.94 -150.98 -5,660.03 411.48 3.656 1,500.73 997.99 677.10 Pass-Major Risk 11,520.67 8,927.88 10,325.00 8,084.79 249.63 75.15 -150.72 -5,676.52 412.85 3.656 1,494.76 997.33 665.20 Pass-Major Risk 11,525.00 8,927.76 10,350.00 8,103.38 249.63 75.38 -150.42 -5,693.19 414.03 3.656 1,489.45 996.75 653.96 Pass-Major Risk 11,525.00 8,927.76 10,375.00 8,121.81 249.63 75.60 -149.68 -5,710.05 415.19 3.656 1,484.69 997.41 642.00 Pass-MajorRisk 11,525.00 8,927.76 10,400.00 8,140.06 249.63 75.83 -148.93- -5,727.09 416.34 3.656 1,480.51 998.08 630.74 Pass-Major Risk 11,535.51 8,927.58 10,425.00 8,158.13 249.64 76.06 -149.25 -5,744.33 417.46 3.656 1,476.78 995.49 623.70 Pass-MajorRisk 11,539.35 8,927.55 10,450.00 8,176.04 249.64 76.29 -148.89 -5,761.74 418.47 3.656 1,473.72 994.91 615.22 Pass-Major Risk 11,550.00 8,927.54 10,475.00 8,193.80 249.64 76.53 -149.20 -5,779.32 419.31 3.656 1,471.38 991.84 610.38 Pass-Major Risk 11,550.00 8,927.54 10,500.00 8,211.40 249.64 76.76 -148.45 -5,797.06 419.98 3.656 1,469.57 992.52 601.97 Pass-Major Risk 11,550.00 8,927.54 10,525.00 8,228.84 249.64 77.00 -147.70 -5,814.97 420.51 3.656 1,468.45 993.21 594.37 Pass-Major Risk 11,555.01 8,927.58 10,550.00 8,246.13 249.65 77.25 -147.45 -5,833.01 421.01 3.656 1,467.87 992.02 589.61 Pass-MajorRisk 11,561.00 8,927.67 10,575.00 8,263.27 249.65 77.49 -147.30 -5,851.20 421.52 3.656 1,467.81 990.37 586.05 Pass-Major Risk,CC 11,561.00 8,927.67 10,600.00 8,280.27 249.65 77.73 -146.56 -5,869.53 422.03 3.656 1,468.25 991.06 580.50 Pass-Major Risk 11,567.55 8,927.80 10,625.00 8,297.10 249.65 77.98 -146.60 -5,888.01 422.46 3.656 1,469.27 988.49 578.48 Pass-Major Risk 11,575.00 8,927.94 10,650.00 8,313.74 249.66 78.23 -146.74 -5,906.66 422.62 3.656 1,471.05 985.25 578.00 Pass-Major Risk 11,575.00 8,927.94 10,675.00 8,330.19 249.66 78.48 -146.00 -5,925.49 422.50 3.656 1,473.56 985.94 574.98 Pass-Major Risk 11,575.00 8,927.94 10,700.00 8,346.45 249.66 78.72 -145.27 -5,944.48 422.12 3.656 1,476.85 986.62 572.91 Pass-Major Risk,ES,SF 11,584.44 8,928.11 10,725.00 8,362.51 249.66 78.97 -145.66 -5,963.63 421.52 3.656 1,480.76 981.96 576.36 Pass-Major Risk 11,588.55 8,928.19 10,750.00 8,378.39 249.67 79.22 -145.42 -5,982.92 420.75 3.656 1,485.35 980.19 578.13 Pass-Major Risk 11,600.00 8,928.41 10,775.00 8,394.07 249.67 79.47 -146.06 -6,002.37 419.82 3.656 1,490.65 973.68 585.10 Pass-Major Risk 11,600.00 8,928.41 10,800.00 8,409.57 249.67 79.72 -145.35 -6,021.96 418.72 3.656 1,496.44 974.34 586.27 Pass-Major Risk 11,600.00 8,928.41 10,825.00 8,424.86 249.67 79.98 -144.65 -6,041.69 417.51 3.656 1,502.87 975.01 588.26 Pass-Major Risk 11,600.00 8,928.41 10,850.00 8,439.96 249.67 80.24 -143.96 -6,061.58 416.19 3.656 1,509.90 975.68 591.04 Pass-MajorRisk 11,600.00 8,928.41 10,875.00 8,454.85 249.67 80.50 -143.28 -6,081.60 414.77 3.656 1,517.54 976.35 594.60 Pass-MajorRisk 11,612.36 8,928.65 10,900.00 8,469.55 249.68 80.76 -144.07 -6,101.77 413.25 3.656 1,525.57 968.62 606.46 Pass-MajorRisk 11,625.00 8,928.90 10,925.00 8,484.04 249.69 81.02 -144.90 -6,122.08 411.62 3.656 1,534.34 960.04 620.13 Pass-Major Risk 11,625.00 8,928.90 10,950.00 8,498.33 249.69 81.29 -144.25 -6,142.52 409.89 3.656 1,543.47 960.69 625.75 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/6/2015 3:37:48PM Page 15 COMPASS 5000.1 Build 61 • • BP Mill • 0 by Travelling Cylinder Report BAKER INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB X Pad MD Reference: 12: 10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: X-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore X-10A* Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: X-10A WP07 Offset TVD Reference: Offset Datum Offset Design PB X Pad- X-30-X-30APB1-X-30APB1 Offset Site Error: 0.00 usft Survey Program: 200-MWD,11627-MWD,12880-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/-S +EI-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (1 (usft) (usft) (in) (usft) (usft) (usft) 11,500.00 8,928.57 10,175.00 7,970.88 249.62 73.90 -152.49 -5,579.71 400.81 4.812 1,540.05 999.50 749.72 Pass-MajorRisk 11,500.00 8,928.57 10,200.00 7,989.98 249.62 74.11 -151.81 -5,595.66 403.20 4.812 1,531.27 1,000.14 733.61 Pass-Major Risk 11,500.00 8,928.57 10,225.00 8,009.09 249.62 74.32 -151.13 -5,611.61 405.55 4.812 1,522.86 1,000.78 717.87 Pass-Major Risk 11,508.97 8,928.26 10,250.00 8,028.19 249.62 74.53 -151.54 -5,627.58 407.82 4.812 1,514.79 998.97 704.20 Pass-Major Risk 11,516.00 8,928.02 10,275.00 8,047.18 249.63 74.73 -151.71 -5,643.71 409.81 4.812 1,507.42 997.46 691.06 Pass-Major Risk 11,516.00 8,928.02 10,300.00 8,066.05 249.63 74.94 -150.98 -5,660.03 411.48 4.812 1,500.73 998.09 677.00 Pass-Major Risk 11,520.67 8,927.88 10,325.00 8,084.79 249.63 75.15 -150.72 -5,676.52 412.85 4.812 1,494.76 997.43 665.11 Pass-Major Risk 11,525.00 8,927.76 10,350.00 8,103.38 249.63 75.38 -150.42 -5,693.19 414.03 4.812 1,489.45 996.84 653.87 Pass-Major Risk 11,525.00 8,927.76 10,375.00 8,121.81 249.63 75.60 -149.68 -5,710.05 415.19 4.812 1,484.69 997.51 641.90 Pass-MajorRisk 11,525.00 8,927.76 10,400.00 8,140.06 249.63 75.83 -148.93 -5,727.09 416.34 4.812 1,480.51 998.18 630.64 Pass-Major Risk 11,535.51 8,927.58 10,425.00 8,158.13 249.64 76.06 -149.25 -5,744.33 417.46 4.812 1,476.78 995.59 623.60 Pass-Major Risk 11,539.35 8,927.55 10,450.00 8,176.04 249.64 76.29 -148.89 -5,761.74 418.47 4.812 1,473.72 995.01 615.12 Pass-Major Risk 11,550.00 8,927.54 10,475.00 8,193.80 249.64 76.53 -149.20 -5,779.32 419.31 4.812 1,471.38 991.94 610.28 Pass-MajorRisk 11,550.00 8,927.54 10,500.00 8,211.40 249.64 76.76 -148.45 -5,797.06 419.98 4.812 1,469.57 992.62 601.87 Pass-Major Risk 11,550.00 8,927.54 10,525.00 8,228.84 249.64 77.00 -147.70 -5,814.97 420.51 4.812 1,468.45 993.31 594.28 Pass-Major Risk 11,555.01 8,927.58 10,550.00 8,246.13 249.65 77.25 -147.45 -5,833.01 421.01 4.812 1,467.87 992.12 589.51 Pass-MajorRisk 11,561.00 8,927.67 10,575.00 8,263.27 249.65 77.49 -147.30 -5,851.20 421.52 4.812 1,467.81 990.47 585.95 Pass-Major Risk,CC 11,561.00 8,927.67 10,600.00 8,280.27 249.65 77.73 -146.56 -5,869.53 422.03 4.812 1,468.25 991.16 580.40 Pass-Major Risk 11,567.55 8,927.80 10,625.00 8,297.10 249.65 77.98 -146.60 -5,888.01 422.46 4.812 1,469.27 988.59 578.39 Pass-Major Risk 11,575.00 8,927.94 10,650.00 8,313.74 249.66 78.23 -146.74 -5,906.66 422.62 4.812 1,471.05 985.35 577.91 Pass-Major Risk 11,575.00 8,927.94 10,675.00 8,330.19 249.66 78.48 -146.00 -5,925.49 422.50 4.812 1,473.56 986.03 574.88 Pass-Major Risk 11,575.00 8,927.94 10,700.00 8,346.45 249.66 78.72 -145.27 -5,944.48 422.12 4.812 1,476.85 986.72 572.82 Pass-Major Risk,ES,SF 11,584.44 8,928.11 10,725.00 8,362.51 249.66 78.97 -145.66 -5,963.63 421.52 4.812 1,480.76 982.06 576.26 Pass-Major Risk 11,588.55 8,928.19 10,750.00 8,378.39 249.67 79.22 -145.42 -5,982.92 420.75 4.812 1,485.35 980.29 578.03 Pass-Major Risk 11,600.00 8,928.41 10,775.00 8,394.07 249.67 79.47 -146.06 -6,002.37 419.82 4.812 1,490.65 973.78 585.00 Pass-Major Risk 11,600.00 8,928.41 10,800.00 8,409.57 249.67 79.72 -145.35 -6,021.96 418.72 4.812 1,496.44 974.44 586.18 Pass-Major Risk 11,600.00 8,928.41 10,825.00 8,424.86 249.67 79.98 -144.65 -6,041.69 417.51 4.812 1,502.87 975.11 588.16 Pass-Major Risk 11,600.00 8,928.41 10,850.00 8,439.96 249.67 80.24 -143.96 -6,061.58 416.19 4.812 1,509.90 975.78 590.94 Pass-Major Risk 11,600.00 8,928.41 10,875.00 8,454.85 249.67 80.50 -143.28 -6,081.60 414.77 4.812 1,517.54 976.44 594.50 Pass-Major Risk 11,612.36 8,928.65 10,900.00 8,469.55 249.68 80.76 -144.07 -6,101.77 413.25 4.812 1,525.57 968.72 606.36 Pass-Major Risk 11,625.00 8,928.90 10,925.00 8,484.04 249.69 81.02 -144.90 -6,122.08 411.62 4.812 1,534.34 960.14 620.04 Pass-Major Risk 11,625.00 8,928.90 10,950.00 8,498.33 249.69 81.29 -144.25 -6,142.52 409.89 4.812 1,543.47 960.79 625.65 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/6/2015 3:37:48PM Page 16 COMPASS 5000.1 Build 61 • BP Mill CI by Travelling Cylinder Report HUGHES INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB X Pad MD Reference: 12:10 7/6/1980 00:00©74.94usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: X-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore X-10A* Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: X-10A WP07 Offset TVD Reference: Offset Datum Offset Design PB X Pad- X-30-X-30APB2-X-30APB2 Offset Site Error: 0.00 usft Survey Program: 200-MWD,11627-MWD,12880-MWD,13448-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NI-S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (1 (usft) (usft) (in) (usft) (usft) (usft) 11,500.00 8,928.57 10,175.00 7,970.88 249.62 73.89 -152.49 -5,579.71 400.81 4.812 1,540.05 999.44 749.75 Pass-Major Risk 11,500.00 8,928.57 10,200.00 7,989.98 249.62 74.10 -151.81 -5,595.66 403.20 4.812 1,531.27 1,000.08 733.64 Pass-Major Risk 11,500.00 8,928.57 10,225.00 8,009.09 249.62 74.30 -151.13 -5,611.61 405.55 4.812 1,522.86 1,000.72 717.90 Pass-Major Risk 11,508.97 8,928.26 10,250.00 8,028.19 249.62 74.51 -151.54 -5,627.58 407.82 4.812 1,514.79 998.91 704.23 Pass-Major Risk 11,516.00 8,928.02 10,275.00 8,047.18 249.63 74.72 -151.71 -5,643.71 409.81 4.812 1,507.42 997.40 691.09 Pass-Major Risk 11,516.00 8,928.02 10,300.00 8,066.05 249.63 74.93 -150.98 -5,660.03 411.48 4.812 1,500.73 998.03 677.03 Pass-Major Risk 11,520.67 8,927.88 10,325.00 8,084.79 249.63 75.14 -150.72 -5,676.52 412.85 4.812 1,494.76 997.37 665.14 Pass-Major Risk 11,525.00 8,927.76 10,350.00 8,103.38 249.63 75.36 -150.42 -5,693.19 414.03 4.812 1,489.45 996.78 653.90 Pass-Major Risk 11,525.00 8,927.76 10,375.00 8,121.81 249.63 75.59 -149.68 -5,710.05 415.19 4.812 1,484.69 997.45 641.94 Pass-Major Risk 11,525.00 8,927.76 10,400.00 8,140.06 249.63 75.81 -148.93 -5,727.09 416.34 4.812 1,480.51 998.12 630.68 Pass-Major Risk 11,535.51 8,927.58 10,425.00 8,158.13 249.64 76.04 -149.25 -5,744.33 417.46 4.812 1,476.78 995.53 623.64 Pass-Major Risk 11,539.35 8,927.55 10,450.00 8,176.04 249.64 76.28 -148.89 -5,761.74 418.47 4.812 1,473.72 994.95 615.16 Pass-Major Risk 11,550.00 8,927.54 10,475.00 8,193.80 249.64 76.51 -149.20 -5,779.32 419.31 4.812 1,471.38 991.88 610.31 Pass-Major Risk 11,550.00 8,927.54 10,500.00 8,211.40 249.64 76.75 -148.45 -5,797.06 419.98 4.812 1,469.57 992.56 601.91 Pass-Major Risk 11,550.00 8,927.54 10,525.00 8,228.84 249.64 76.99 -147.70 -5,814.97 420.51 4.812 1,468.45 993.25 594.31 Pass-Major Risk 11,555.01 8,927.58 10,550.00 8,246.13 249.65 77.23 -147.45 -5,833.01 421.01 4.812 1,467.87 992.06 589.54 Pass-Major Risk 11,561.00 8,927.67 10,575.00 8,263.27 249.65 77.47 -147.30 -5,851.20 421.52 4.812 1,467.81 990.41 585.99 Pass-Major Risk,CC 11,561.00 8,927.67 10,600.00 8,280.27 249.65 77.72 -146.56 -5,869.53 422.03 4.812 1,468.25 991.10 580.44 Pass-Major Risk 11,567.55 8,927.80 10,625.00 8,297.10 249.65 77.96 -146.60 -5,888.01 422.46 4.812 1,469.27 988.53 578.42 Pass-Major Risk 11,575.00 8,927.94 10,650.00 8,313.74 249.66 78.21 -146.74 -5,906.66 422.62 4.812 1,471.05 985.29 577.94 Pass-Major Risk 11,575.00 8,927.94 10,675.00 8,330.19 249.66 78.46 -146.00 -5,925.49 422.50 4.812 1,473.56 985.97 574.92 Pass-Major Risk 11,575.00 8,927.94 10,700.00 8,346.45 249.66 78.71 -145.27 -5,944.48 422.12 4.812 1,476.85 986.66 572.85 Pass-Major Risk,ES,SF 11,584.44 8,928.11 10,725.00 8,362.51 249.66 78.96 -145.66 -5,963.63 421.52 4.812 1,480.76 982.00 576.30 Pass-Major Risk 11,588.55 8,928.19 10,750.00 8,378.39 249.67 79.21 -145.42 -5,982.92 420.75 4.812 1,485.35 980.23 578.07 Pass-Major Risk 11,600.00 8,928.41 10,775.00 8,394.07 249.67 79.46 -146.06 -6,002.37 419.82 4.812 1,490.65 973.72 585.04 Pass-Major Risk 11,600.00 8,928.41 10,800.00 8,409.57 249.67 79.71 -145.35 -6,021.96 418.72 4.812 1,496.44 974.38 586.21 Pass-Major Risk 11,600.00 8,928.41 10,825.00 8,424.86 249.67 79.97 -144.65 -6,041.69 417.51 4.812 1,502.87 975.05 588.20 Pass-Major Risk 11,600.00 8,928.41 10,850.00 8,439.96 249.67 80.22 -143.96 -6,061.58 416.19 4.812 1,509.90 975.72 590.98 Pass-Major Risk 11,600.00 8,928.41 10,875.00 8,454.85 249.67 80.48 -143.28 -6,081.60 414.77 4.812 1,517.54 976.38 594.54 Pass-Major Risk 11,612.36 8,928.65 10,900.00 8,469.55 249.68 80.74 -144.07 -6,101.77 413.25 4.812 1,525.57 968.66 606.40 Pass-Major Risk 11,625.00 8,928.90 10,925.00 8,484.04 249.69 81.01 -144.90 -6,122.08 411.62 4.812 1,534.34 960.08 620.07 Pass-Major Risk 11,625.00 8,928.90 10,950.00 8,498.33 249.69 81.27 -144.25 -6,142.52 409.89 4.812 1,543.47 960.73 625.69 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/6/2015 3:37:48PM Page 17 COMPASS 5000.1 Build 61 BP ERE - 0 by Travelling Cylinder Report BAKER HUGHES INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB X Pad MD Reference: 12: 10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: X-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore X-10A* Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: X-10A WP07 Offset TVD Reference: Offset Datum Offset Design PB X Pad- X-30-X-30PB1 -X-30PB1 Offset Site Error: 0.00 usft Survey Program: 200-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Tooiface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +Nl-S +El-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (1 (usft) (usft) (In) (usft) (usft) (usft) 11,500.00 8,928.57 10,175.00 7,970.88 249.62 74.55 -152.49 -5,579.71 400.81 5.875 1,540.05 1,002.44 748.23 Pass-MajorRisk 11,500.00 8,928.57 10,200.00 7,989.98 249.62 74.76 -151.81 -5,595.66 403.20 5.875 1,531.27 1,003.09 732.09 Pass-MajorRisk 11,500.00 8,928.57 10,225.00 8,009.09 249.62 74.97 -151.13 -5,611.61 405.55 5.875 1,522.86 1,003.74 716.34 Pass-MajorRisk 11,508.97 8,928.26 10,250.00 8,028.19 249.62 75.18 -151.54 -5,627.58 407.82 5.875 1,514.79 1,001.93 702.66 Pass-Major Risk 11,516.00 8,928.02 10,275.00 8,047.18 249.63 75.39 -151.71 -5,643.71 409.81 5.875 1,507.42 1,000.41 689.51 Pass-Major Risk 11,516.00 8,928.02 10,300.00 8,066.05 249.63 75.60 -150.98 -5,660.03 411.48 5.875 1,500.73 1,001.05 675.43 Pass-Major Risk 11,520.67 8,927.88 10,325.00 8,084.79 249.63 75.81 -150.72 -5,676.52 412.85 5.875 1,494.76 1,000.39 663.52 Pass-Major Risk 11,525.00 8,927.76 10,350.00 8,103.38 249.63 76.04 -150.42 -5,693.19 414.03 5.875 1,489.45 999.80 652.27 Pass-Major Risk 11,525.00 8,927.76 10,375.00 8,121.81 249.63 76.27 -149.68 -5,710.05 415.19 5.875 1,484.69 1,000.48 640.29 Pass-Major Risk 11,525.00 8,927.76 10,400.00 8,140.06 249.63 76.49 -148.93 -5,727.09 416.34 5.875 1,480.51 1,001.16 629.01 Pass-Major Risk 11,535.51 8,927.58 10,425.00 8,158.13 249.64 76.72 -149.25 -5,744.33 417.46 5.875 1,476.78 998.56 621.97 Pass-Major Risk 11,539.35 8,927.55 10,450.00 8,176.04 249.64 76.96 -148.89 -5,761.74 418.47 5.875 1,473.72 997.98 613.48 Pass-Major Risk 11,550.00 8,927.54 10,475.00 8,193.80 249.64 77.20 -149.20 -5,779.32 419.31 5.875 1,471.38 994.89 608.64 Pass-Major Risk 11,550.00 8,927.54 10,500.00 8,211.40 249.64 77.44 -148.45 -5,797.06 419.98 5.875 1,469.57 995.58 600.21 Pass-MajorRisk 11,550.00 8,927.54 10,525.00 8,228.84 249.64 77.68 -147.70 -5,814.97 420.51 5.875 1,468.45 996.28 592.60 Pass-Major Risk 11,555.01 8,927.58 10,550.00 8,246.13 249.65 77.92 -147.45 -5,833.01 421.01 5.875 1,467.87 995.09 587.82 Pass-Major Risk 11,561.00 8,927.67 10,575.00 8,263.27 249.65 78.17 -147.30 -5,851.20 421.52 5.875 1,467.81 993.43 584.26 Pass-Major Risk,CC 11,561.00 8,927.67 10,600.00 8,280.27 249.65 78.41 -146.56 -5,869.53 422.03 5.875 1,468.25 994.13 578.69 Pass-Major Risk 11,567.55 8,927.80 10,625.00 8,297.10 249.65 78.66 -146.60 -5,888.01 422.46 5.875 1,469.27 991.55 576.67 Pass-Major Risk 11,575.00 8,927.94 10,650.00 8,313.74 249.66 78.91 -146.74 -5,906.66 422.62 5.875 1,471.05 988.30 576.19 Pass-Major Risk 11,575.00 8,927.94 10,675.00 8,330.19 249.66 79.16 -146.00 -5,925.49 422.50 5.875 1,473.56 989.00 573.15 Pass-Major Risk 11,575.00 8,927.94 10,700.00 8,346.45 249.66 79.41 -145.27 -5,944.48 422.12 5.875 1,476.85 989.69 571.07 Pass-Major Risk,ES,SF 11,584.44 8,928.11 10,725.00 8,362.51 249.66 79.66 -145.66 -5,963.63 421.52 5.875 1,480.76 985.01 574.51 Pass-Major Risk 11,588.55 8,928.19 10,750.00 8,378.39 249.67 79.91 -145.42 -5,982.92 420.75 5.875 1,485.35 983.24 576.28 Pass-Major Risk 11,600.00 8,928.41 10,775.00 8,394.07 249.67 80.17 -146.06 -6,002.37 419.82 5.875 1,490.65 976.70 583.25 Pass-Major Risk 11,600.00 8,928.41 10,800.00 8,409.57 249.67 80.42 -145.35 -6,021.96 418.72 5.875 1,496.44 977.37 584.42 Pass-Major Risk 11,600.00 8,928.41 10,825.00 8,424.86 249.67 80.68 -144.65 -6,041.69 • 417.51 5.875 1,502.87 978.05 586.39 Pass-MajorRisk 11,600.00 8,928.41 10,850.00 8,439.96 249.67 80.94 -143.96 -6,061.58 416.19 5.875 1,509.90 978.73 589.15 Pass-MajorRisk 11,600.00 8,928.41 10,875.00 8,454.85 249.67 81.20 -143.28 -6,081.60 414.77 5.875 1,517.54 979.40 592.70 Pass-Major Risk 11,612.36 8,928.65 10,900.00 8,469.55 249.68 81.46 -144.07 -6,101.77 413.25 5.875 1,525.57 971.64 604.58 Pass-Major Risk 11,625.00 8,928.90 10,925.00 8,484.04 249.69 81.73 -144.90 -6,122.08 411.62 5.875 1,534.34 963.03 618.27 Pass-Major Risk 11,625.00 8,928.90 10,950.00 8,498.33 249.69 82.00 -144.25 -6,142.52 409.89 5.875 1,543.47 963.69 623.87 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/6/2015 3:37.:48PM Page 18 COMPASS 5000.1 Build 61 RIM . 0 by Travelling CylBPinder Report HUGHES INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB X Pad MD Reference: 12: 10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: X-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore X-10A* Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: X-10A WP07 Offset TVD Reference: Offset Datum Offset Design PB X Pad- X-33-X-33-X-33 Offset Site Error: 0.00 usft Survey Program: 123-MWD,12420-MWD Rule Assigned:Major Risk • Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +Ni-S +E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (in) (usft) (usft) (usft) 11,657.78 8,929.55 10,225.00 7,412.53 249.71 85.63 148.74 -5,478.51 1,411.83 5.562 1,544.37 946.90 1,313.53 Pass-Major Risk 11,667.52 8,929.74 10,250.00 7,428.78 249.71 85.88 148.11 -5,497.34 1,414.32 5.562 1,530.81 938.58 1,294.16 Pass-Major Risk 11,675.00 8,929.89 10,275.00 7,445.11 249.72 86.14 147.76 -5,516.12 1,416.74 5.562 1,517.37 932.08 1,274.46 Pass-MajorRisk 11,686.07 8,930.12 10,300.00 7,461.52 249.72 86.39 147.01 -5,534.82 1,419.16 5.562 1,504.02 921.72 1,255.29 Pass-MajorRisk 11,700.00 8,930.40 10,325.00 7,478.04 249.73 86.64 145.94 -5,553.42 1,421.66 5.562 1,490.78 907.81 1,236.79 Pass-Major Risk 11,700.00 8,930.40 10,350.00 7,494.66 249.73 86.89 146.53 -5,571.92 1,424.22 5.562 1,477.60 908.45 1,215.74 Pass-Major Risk 11,711.88 8,930.64 10,375.00 7,511.38 249.74 87.14 145.74 -5,590.31 1,426.85 5.562 1,464.51 896.08 1,196.97 Pass-Major Risk 11,725.00 8,930.91 10,400.00 7,528.15 249.75 87.39 144.82 -5,608.66 1,429.57 5.562 1,451.60 881.73 1,178.84 Pass-MajorRisk 11,725.00 8,930.91 10,425.00 7,544.94 249.75 87.65 145.46 -5,626.97 1,432.39 5.562 1,438.88 882.36 1,157.75 Pass-MajorRisk 11,735.69 8,931.13 10,450.00 7,561.74 249.75 87.90 144.86 -5,645.25 1,435.29 5.562 1,426.36 870.30 1,139.45 Pass-MajorRisk 11,743.25 8,931.28 10,475.00 7,578.54 249.76 88.15 144.64 -5,663.52 1,438.29 5.562 1,414.09 861.70 1,120.62 Pass-Major Risk 11,750.00 8,931.42 10,500.00 7,595.21 249.76 88.41 144.54 -5,681.89 1,441.38 5.562 1,402.22 853.92 1,101.93 Pass-Major Risk 11,757.96 8,931.58 10,525.00 7,611.70 249.77 88.67 144.32 -5,700.41 1,444.56 5.562 1,390.82 844.41 1,084.08 Pass-MajorRisk 11,765.12 8,931.73 10,550.00 7,628.02 249.77 88.93 144.21 -5,719.07 1,447.82 5.562 1,379.90 835.72 1,066.48 Pass-MajorRisk 11,775.00 8,931.93 10,575.00 7,644.15 249.78 89.20 143.80 -5,737.87 1,451.18 5.562 1,369.48 823.20 1,050.44 Pass-MajorRisk 11,775.00 8,931.93 10,600.00 7,660.06 249.78 89.47 144.57 -5,756.82 1,454.70 5.562 1,359.58 823.85 1,031.21 Pass-MajorRisk 11,785.96 8,932.16 10,625.00 7,675.76 249.79 89.74 144.07 -5,775.92 1,458.41 5.562 1,350.20 809.51 1,016.83 Pass-Major Risk 11,792.73 8,932.30 10,650.00 7,691.25 249.79 90.01 144.08 -5,795.16 1,462.30 5.562 1,341.39 800.68 1,001.49 Pass-MajorRisk 11,800.00 8,932.45 10,675.00 7,706.58 249.79 90.28 144.04 -5,814.49 1,466.31 5.562 1,333.05 790.97 986.99 Pass-MajorRisk 11,800.00 8,932.45 10,700.00 7,721.97 249.79 90.56 144.87 -5,833.79 1,470.27 5.562 1,325.05 791.59 969.39 Pass-Major Risk 11,812.02 8,932.69 10,725.00 7,737.42 249.80 90.83 144.32 -5,853.05 1,474.18 5.562 1,317.29 774.74 958.03 Pass-MajorRisk 11,818.03 8,932.82 10,750.00 7,752.94 249.81 91.10 144.48 -5,872.27 1,478.04 5.562 1,309.86 766.44 944.18 Pass-Major Risk 11,825.00 8,932.96 10,775.00 7,768.52 249.81 91.37 144.55 -5,891.45 1,481.85 5.562 1,302.75 756.54 931.36 Pass-MajorRisk 11,825.00 8,932.96 10,800.00 7,784.17 249.81 91.63 145.46 -5,910.58 1,485.62 5.562 1,295.96 757.11 914.88 Pass-Major Risk 11,834.89 8,933.16 10,825.00 7,799.90 249.82 91.90 145.22 -5,929.65 1,489.33 5.562 1,289.46 742.54 904.77 Pass-Major Risk 11,840.15 8,933.27 10,850.00 7,815.70 249.82 92.16 145.53 -5,948.67 1,493.00 5.562 1,283.30 734.93 892.38 Pass-Major Risk 11,850.00 8,933.47 10,875.00 7,831.56 249.82 92.43 145.32 -5,967.64 1,496.69 5.562 1,277.49 719.96 883.76 Pass-MajorRisk 11,850.00 8,933.47 10,900.00 7,847.47 249.82 92.69 146.28 -5,986.56 1,500.44 5.562 1,271.98 720.50 868.76 Pass-MajorRisk 11,850.00 8,933.47 10,925.00 7,863.42 249.82 92.96 147.25 -6,005.43 1,504.24 5.562 1,266.87 721.04 854.16 Pass-Major Risk 11,859.84 8,933.67 10,950.00 7,879.43 249.83 93.22 147.08 -6,024.24 1,508.11 5.562 1,262.05 705.77 847.42 Pass-Major Risk 11,864.49 8,933.76 10,975.00 7,895.48 249.83 93.48 147.52 -6,042.98 1,512.09 5.562 1,257.59 698.75 837.41 Pass-Major Risk 11,875.00 8,933.97 11,000.00 7,911.60 249.84 93.75 147.28 -6,061.65 1,516.19 5.562 1,253.49 681.95 833.01 Pass-Major Risk 11,875.00 8,933.97 11,025.00 7,927.78 249.84 94.01 148.29 -6,080.23 1,520.42 5.562 1,249.64 682.47 820.24 Pass-Major Risk 11,877.91 8,934.03 11,050.00 7,944.02 249.84 94.28 148.96 -6,098.75 1,524.74 5.562 1,246.18 678.13 810.53 Pass-Major Risk 11,881.00 8,934.09 11,075.00 7,960.29 249.84 94.54 149.62 -6,117.26 1,528.91 5.562 1,243.17 673.47 801.58 Pass-MajorRisk 11,886.62 8,934.20 11,100.00 7,976.61 249.84 94.80 150.00 -6,135.78 1,532.87 5.562 1,240.63 664.55 795.03 Pass-MajorRisk 11,890.80 8,934.28 11,125.00 7,992.96 249.85 95.06 150.56 -6,154.31 1,536.63 5.562 1,238.58 657.98 788.05 Pass-Major Risk 11,900.00 8,934.43 11,150.00 8,009.35 249.85 95.31 150.54 -6,172.85 1,540.22 5.562 1,237.03 642.69 786.42 Pass-Major Risk 11,900.00 8,934.43 11,175.00 8,025.79 249.85 95.57 151.61 -6,191.35 1,543.75 5.562 1,235.87 643.15 777.16 Pass-Major Risk 11,900.00 8,934.43 11,200.00 8,042.26 249.85 95.82 152.68 -6,209.83 1,547.23 5.562 1,235.17 643.60 768.47 Pass-Major Risk 11,900.00 8,934.43 11,225.00 8,058.78 249.85 96.08 153.75 -6,228.28 1,550.66 5.562 1,234.93 644.05 760.36 Pass-Major Risk,CC 11,909.44 8,934.57 11,250.00 8,075.35 249.86 96.33 153.73 -6,246.69 1,554.07 5.562 1,235.06 628.14 762.29 Pass-Major Risk 11,912.82 8,934.62 11,275.00 8,091.95 249.86 96.59 154.41 -6,265.06 1,557.52 5.562 1,235.64 622.65 759.02 Pass-Major Risk 11,916.12 8,934.66 11,300.00 8,108.59 249.86 96.84 155.10 -6,283.39 1,561.01 5.562 1,236.64 617.29 756.40 Pass-MajorRisk 11,925.00 8,934.76 11,325.00 8,125.27 249.86 97.10 155.13 -6,301.67 1,564.53 5.562 1,238.08 602.00 760.81 Pass-Major Risk 11,925.00 8,934.76 11,350.00 8,142.00 249.86 97.35 156.21 -6,319.91 1,568.06 5.562 1,239.88 602.42 756.00 Pass-Major Risk 11,925.00 8,934.76 11,375.00 8,158.79 249.86 97.61 157.29 -6,338.10 1,571.57 5.562 1,242.10 602.84 751.77 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/6/2015 3:37:48PM Page 19 COMPASS 5000.1 Build 61 Fai BP BAKER• . 0 by Travelling Cylinder Report HUGHES INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB X Pad MD Reference: 12: 10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: X-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore X-10A* Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: X-10A WP07 Offset TVD Reference: Offset Datum Offset Design PB X Pad- X-33-X-33-X-33 Offset Site Error: 0.00 usft Survey Program: 123-MWD,12420-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/-S +EI-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (1 (usft) (usft) (in) (usft) (usft) (usft) 11,925.00 8,934.76 11,400.00 8,175.64 249.86 97.86 158.37 -6,356.23 1,575.07 5.562 1,244.75 603.26 748.14 Pass-MajorRisk 11,925.00 8,934.76 11,425.00 8,192.55 249.86 98.12 159.44 -6,374.32 1,578.54 5.562 1,247.83 603.67 745.09 Pass-Major Risk,ES,SF 11,934.06 8,934.84 11,450.00 8,209.47 249.87 98.37 159.45 -6,392.41 1,581.90 5.562 1,251.32 587.82 753.94 Pass-Major Risk 11,936.68 8,934.86 11,475.00 8,226.39 249.87 98.62 160.21 -6,410.54 1,585.09 5.562 1,255.39 583.47 755.81 Pass-MajorRisk 11,939.19 8,934.88 11,500.00 8,243.30 249.87 98.87 160.97 -6,428.70 1,588.11 5.562 1,260.00 579.31 758.35 Pass-MajorRisk 11,950.00 8,934.95 11,525.00 8,260.19 249.88 99.12 160.74 -6,446.91 1,590.98 5.562 1,265.23 559.98 772.96 Pass-Major Risk 11,950.00 8,934.95 11,550.00 8,277.02 249.88 99.37 161.80 -6,465.16 1,593.87 5.562 1,270.87 560.34 773.91 Pass-MajorRisk 11,950.00 8,934.95 11,575.00 8,293.78 249.88 99.62 162.84 -6,483.48 1,596.82 5.562 1,277.04 560.70 775.59 Pass-Major Risk 11,950.00 8,934.95 11,600.00 8,310.45 249.88 99.87 163.87 -6,501.87 1,599.85 5.562 1,283.75 561.06 777.99 Pass-Major Risk 11,950.00 8,934.95 11,625.00 8,327.05 249.88 100.12 164.88 -6,520.30 1,602.91 5.562 1,290.98 561.42 781.10 Pass-Major Risk 11,950.00 8,934.95 11,650.00 8,343.66 249.88 100.38 165.89 -6,538.76 1,605.79 5.562 1,298.71 561.78 784.88 Pass-Major Risk 11,950.00 8,934.95 11,675.00 8,360.28 249.88 100.63 166.88 -6,557.25 1,608.48 5.562 1,306.92 562.13 789.32 Pass-Major Risk 11,950.00 8,934.95 11,700.00 8,376.91 249.88 100.88 167.87 -6,575.75 1,610.96 5.562 1,315.61 562.49 794.40 Pass-Major Risk 11,950.00 8,934.95 11,725.00 8,393.56 249.88 101.13 168.84 -6,594.26 1,613.27 5.562 1,324.74 562.82 800.11 Pass-Major Risk 11,960.46 8,934.98 11,750.00 8,410.24 249.88 101.38 168.56 -6,612.74 1,615.51 5.562 1,334.11 543.79 822.28 Pass-Major Risk 11,962.16 8,934.99 11,775.00 8,426.96 249.88 101.63 169.31 -6,631.20 1,617.67 5.562 1,343.94 540.94 831.86 Pass-Major Risk 11,963.80 8,934.99 11,800.00 8,443.72 249.88 101.88 170.06 -6,649.63 1,619.76 5.562 1,354.14 538.21 841.93 Pass-MajorRisk 11,965.39 8,934.99 11,825.00 8,460.50 249.88 102.13 170.79 -6,668.05 1,621.81 5.562 1,364.70 535.55 852.49 Pass-Major Risk 11,975.00 8,934.99 11,850.00 8,477.27 249.89 102.38 170.55 -6,686.48 1,623.88 5.562 1,375.71 517.83 876.70 Pass-Major Risk 11,975.00 8,934.99 11,875.00 8,494.03 249.89 102.63 171.45 -6,704.90 1,625.96 5.562 1,386.97 518.12 885.89 Pass-Major Risk 11,975.00 8,934.99 11,900.00 8,510.79 249.89 102.88 172.33 -6,723.34 1,628.05 5.562 1,398.59 518.42 895.59 Pass-Major Risk 11,975.00 8,934.99 11,925.00 8,527.45 249.89 103.13 173.20 -6,741.86 1,630.13 5.562 1,410.68 518.72 905.88 Pass-Major Risk 11,975.00 8,934.99 11,950.00 8,543.95 249.89 103.39 174.04 -6,760.53 1,632.18 5.562 1,423.28 519.01 916.82 Pass-Major Risk 11,975.00 8,934.99 11,975.00 8,560.30 249.89 103.64 174.87 -6,779.34 1,634.21 5.562 1,436.40 519.31 928.40 Pass-Major Risk 11,975.00 8,934.99 12,000.00 8,576.49 249.89 103.90 175.68 -6,798.28 1,636.22 5.562 1,449.98 519.61 940.57 Pass-Major Risk 11,975.00 8,934.99 12,025.00 8,592.69 249.89 104.15 176.47 -6,817.20 1,638.34 5.562 1,463.83 519.92 953.11 Pass-Major Risk 11,975.00 8,934.99 12,050.00 8,608.95 249.89 104.41 177.25 -6,836.06 1,640.62 5.562 1,477.88 520.23 965.94 Pass-Major Risk 11,975.00 8,934.99 12,075.00 8,625.26 249.89 104.66 178.01 -6,854.84 1,643.04 5.562 1,492.11 520.54 979.05 Pass-MajorRisk 11,975.00 8,934.99 12,100.00 8,641.63 249.89 104.92 178.76 -6,873.57 1,645.57 5.562 1,506.53 520.84 992.45 Pass-MajorRisk 11,975.00 8,934.99 12,125.00 8,658.08 249.89 105.17 179.50 -6,892.24 1,647.95 5.562 1,521.19 521.15 1,006.18 Pass-MajorRisk 11,975.00 8,934.99 12,150.00 8,674.60 249.89 105.42 -179.77 -6,910.87 1,650.15 5.562 1,536.08 521.45 1,020.23 Pass-MajorRisk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/6/2015 3:37:48PM Page 20 COMPASS 5000.1 Build 61 BP Mill - 0 by Travelling Cylinder Report R HUGHES INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB X Pad MD Reference: 12:10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: X-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore X-10A` Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: X-10A WP07 Offset TVD Reference: Offset Datum Offset Design PB X Pad- X-33-X-33PB1-X-33PB1 Offset Site Error: 0.00 usft Survey Program: 123-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NI-S +EI-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) C) (usft) (usft) (in) (usft) (usft) (usft) 11,657.78 8,929.55 10,225.00 7,412.53 249.71 85.63 148.74 -5,478.51 1,411.83 3.500 1,544.37 946.73 1,313.70 Pass-Major Risk 11,667.52 8,929.74 10,250.00 7,428.78 249.71 85.88 148.11 -5,497.34 1,414.32 3.500 1,530.81 938.41 1,294.33 Pass-Major Risk 11,675.00 8,929.89 10,275.00 7,445.11 249.72 86.14 147.76 -5,516.12 1,416.74 3.500 1,517.37 931.91 1,274.63 Pass-Major Risk 11,686.07 8,930.12 10,300.00 7,461.52 249.72 86.39 147.01 -5,534.82 1,419.16 3.500 1,504.02 921.54 1,255.47 Pass-Major Risk 11,700.00 8,930.40 10,325.00 7,478.04 249.73 86.64 145.94 -5,553.42 1,421.66 3.500 1,490.78 907.63 1,236.96 Pass-Major Risk 11,700.00 8,930.40 10,350.00 7,494.66 249.73 86.89 146.53 -5,571.92 1,424.22 3.500 1,477.60 908.28 1,215.91 Pass-MajorRisk 11,711.88 8,930.64 10,375.00 7,511.38 249.74 87.14 145.74 -5,590.31 1,426.85 3.500 1,464.51 895.91 1,197.15 Pass-MajorRisk 11,725.00 8,930.91 10,400.00 7,528.15 249.75 87.39 144.82 -5,608.66 1,429.57 3.500 1,451.60 881.56 1,179.01 Pass-MajorRisk 11,725.00 8,930.91 10,425.00 7,544.94 249.75 87.65 145.46 -5,626.97 1,432.39 3.500 1,438.88 882.19 1,157.93 Pass-Major Risk 11,735.69 8,931.13 10,450.00 7,561.74 249.75 87.90 144.86 -5,645.25 1,435.29 3.500 1,426.36 870.13 1,139.62 Pass-Major Risk 11,743.25 8,931.28 10,475.00 7,578.54 249.76 88.15 144.64 -5,663.52 1,438.29 3.500 1,414.09 861.53 1,120.79 Pass-MajorRisk 11,750.00 8,931.42 10,500.00 7,595.21 249.76 88.41 144.54 -5,681.89 1,441.38 3.500 1,402.22 853.74 1,102.11 Pass-Major Risk 11,757.96 8,931.58 10,525.00 7,611.70 249.77 88.67 144.32 -5,700.41 1,444.56 3.500 1,390.82 844.24 1,084.26 Pass-Major Risk 11,765.12 8,931.73 10,550.00 7,628.02 249.77 88.93 144.21 -5,719.07 1,447.82 3.500 1,379.90 835.55 1,066.66 Pass-Major Risk 11,775.00 8,931.93 10,575.00 7,644.15 249.78 89.20 143.80 -5,737.87 1,451.18 3.500 1,369.48 823.03 1,050.62 Pass-Major Risk 11,775.00 8,931.93 10,600.00 7,660.06 249.78 89.47 144.57 -5,756.82 1,454.70 3.500 1,359.58 823.67 1,031.38 Pass-Major Risk 11,785.96 8,932.16 10,625.00 7,675.76 249.79 89.74 144.07 -5,775.92 1,458.41 3.500 1,350.20 809.33 1,017.00 Pass-Major Risk 11,792.73 8,932.30 10,650.00 7,691.25 249.79 90.01 144.08 -5,795.16 1,462.30 3.500 1,341.39 800.50 1,001.66 Pass-Major Risk 11,800.00 8,932.45 10,675.00 7,706.58 249.79 90.28 144.04 -5,814.49 1,466.31 3.500 1,333.05 790.79 987.16 Pass-Major Risk 11,800.00 8,932.45 10,700.00 7,721.97 249.79 90.56 144.87 -5,833.79 1,470.27 3.500 1,325.05 791.42 969.56 Pass-Major Risk 11,812.02 8,932.69 10,725.00 7,737.42 249.80 90.83 144.32 -5,853.05 1,474.18 3.500 1,317.29 774.57 958.20 Pass-Major Risk 11,818.03 8,932.82 10,750.00 7,752.94 249.81 91.10 144.48 -5,872.27 1,478.04 3.500 1,309.86 766.26 944.36 Pass-Major Risk 11,825.00 8,932.96 10,775.00 7,768.52 249.81 91.37 144.55 -5,891.45 1,481.85 3.500 1,302.75 756.37 931.54 Pass-Major Risk 11,825.00 8,932.96 10,800.00 7,784.17 249.81 91.63 145.46 -5,910.58 1,485.62 3.500 1,295.96 756.94 915.06 Pass-Major Risk 11,834.89 8,933.16 10,825.00 7,799.90 249.82 91.90 145.22 -5,929.65 1,489.33 3.500 1,289.46 742.37 904.94 Pass-Major Risk 11,840.15 8,933.27 10,850.00 7,815.70 249.82 92.16 145.53 -5,948.67 1,493.00 3.500 1,283.30 734.76 892.55 Pass-Major Risk 11,850.00 8,933.47 10,875.00 7,831.56 249.82 92.43 145.32 -5,967.64 1,496.69 3.500 1,277.49 719.79 883.94 Pass-Major Risk 11,850.00 8,933.47 10,900.00 7,847.47 249.82 92.69 146.28 -5,986.56 1,500.44 3.500 1,271.98 720.33 868.94 Pass-Major Risk 11,850.00 8,933.47 10,925.00 7,863.42 249.82 92.96 147.25 -6,005.43 1,504.24 3.500 1,266.87 720.87 854.33 Pass-Major Risk 11,859.84 8,933.67 10,950.00 7,879.43 249.83 93.22 147.08 -6,024.24 1,508.11 3.500 1,262.05 705.60 847.59 Pass-Major Risk 11,864.49 8,933.76 10,975.00 7,895.48 249.83 93.48 147.52 -6,042.98 1,512.09 3.500 1,257.59 698.57 837.58 Pass-Major Risk 11,875.00 8,933.97 11,000.00 7,911.60 249.84 93.75 147.28 -6,061.65 1,516.19 3.500 1,253.49 681.78 833.18 Pass-Major Risk 11,875.00 8,933.97 11,025.00 7,927.78 249.84 94.01 148.29 -6,080.23 1,520.42 3.500 1,249.64 682.30 820.41 Pass-Major Risk 11,877.91 8,934.03 11,050.00 7,944.02 249.84 94.28 148.96 -6,098.75 1,524.74 3.500 1,246.18 677.96 810.70 Pass-Major Risk 11,881.00 8,934.09 11,075.00 7,960.29 249.84 94.54 149.62 -6,117.26 1,528.91 3.500 1,243.17 673.30 801.75 Pass-MajorRisk 11,886.62 8,934.20 11,100.00 7,976.61 249.84 94.80 150.00 -6,135.78 1,532.87 3.500 1,240.63 664.38 795.20 Pass-Major Risk 11,890.80 8,934.28 11,125.00 7,992.96 249.85 95.06 150.56 -6,154.31 1,536.63 3.500 1,238.58 657.81 788.22 Pass-MajorRisk 11,900.00 8,934.43 11,150.00 8,009.35 249.85 95.31 150.54 -6,172.85 1,540.22 3.500 1,237.03 642.52 786.59 Pass-MajorRisk 11,900.00 8,934.43 11,175.00 8,025.79 249.85 95.57 151.61 -6,191.35 1,543.75 3.500 1,235.87 642.97 777.34 Pass-Major Risk 11,900.00 8,934.43 11,200.00 8,042.26 249.85 95.82 152.68 -6,209.83 1,547.23 3.500 1,235.17 643.43 768.65 Pass-Major Risk 11,900.00 8,934.43 11,225.00 8,058.78 249.85 96.08 153.75 -6,228.28 1,550.66 3.500 1,234.93 643.88 760.53 Pass-Major Risk,CC 11,909.44 8,934.57 11,250.00 8,075.35 249.86 96.33 153.73 -6,246.69 1,554.07 3.500 1,235.06 627.97 762.46 Pass-Major Risk 11,912.82 8,934.62 11,275.00 8,091.95 249.86 96.59 154.41 -6,265.06 1,557.52 3.500 1,235.64 622.48 759.20 Pass-MajorRisk 11,916.12 8,934.66 11,300.00 8,108.59 249.86 96.84 155.10 -6,283.39 1,561.01 3.500 1,236.64 617.11 756.58 Pass-MajorRisk 11,925.00 8,934.76 11,325.00 8,125.27 249.86 97.10 155.13 -6,301.67 1,564.53 3.500 1,238.08 601.82 760.98 Pass-Major Risk 11,925.00 8,934.76 11,350.00 8,142.00 249.86 97.35 156.21 -6,319.91 1,568.06 3.500 1,239.88 602.24 756.17 Pass-Major Risk 11,925.00 8,934.76 11,375.00 8,158.79 249.86 97.61 157.29 -6,338.10 1,571.57 3.500 1,242.10 602.66 751.95 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/6/2015 3:37:48PM Page 21 COMPASS 5000.1 Build 61 BP RIM 1,. 0 bP Travelling Cylinder Report HUGHES INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well X-10-Slot 10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB X Pad MD Reference: 12: 10 7/6/1980 00:00 @ 74.94usft(generic drilling rig) Site Error: 0.00 usft North Reference: True Reference Well: X-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore X-10A* Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: X-10A WP07 Offset TVD Reference: Offset Datum Offset Design PB X Pad- X-33-X-33PB1-X-33PB1 Offset Site Error: 0.0o usft Survey Program: 123-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NI-S +EI-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (") (usft) (usft) (in) (usft) (usft) (usft) 11,925.00 8,934.76 11,400.00 8,175.64 249.86 97.86 158.37 -6,356.23 1,575.07 3.500 1,244.75 603.08 748.31 Pass-MajorRisk 11,925.00 8,934.76 11,425.00 8,192.55 249.86 98.12 159.44 -6,374.32 1,578.54 3.500 1,247.83 603.50 745.27 Pass-Major Risk,ES,SF 11,934.06 8,934.84 11,450.00 8,209.47 249.87 98.37 159.45 -6,392.41 1,581.90 3.500 1,251.32 587.65 754.11 Pass-Major Risk 11,936.68 8,934.86 11,475.00 8,226.39 249.87 98.62 160.21 -6,410.54 1,585.09 3.500 1,255.39 583.30 755.98 Pass-Major Risk 11,939.19 8,934.88 11,500.00 8,243.30 249.87 98.87 160.97 -6,428.70 1,588.11 3.500 1,260.00 579.14 758.53 Pass-Major Risk 11,950.00 8,934.95 11,525.00 8,260.19 249.88 99.12 160.74 -6,446.91 1,590.98 3.500 1,265.23 559.81 773.14 Pass-Major Risk 11,950.00 8,934.95 11,550.00 8,277.02 249.88 99.37 161.80 -6,465.16 1,593.87 3.500 1,270.87 560.17 774.08 Pass-MajorRisk 11,950.00 8,934.95 11,575.00 8,293.78 249.88 99.62 162.84 -6,483.48 1,596.82 3.500 1,277.04 560.53 775.76 Pass-Major Risk 11,950.00 8,934.95 11,600.00 8,310.45 249.88 99.87 163.87 -6,501.87 1,599.85 3.500 1,283.75 560.89 778.16 Pass-Major Risk 11,950.00 8,934.95 11,625.00 8,327.05 249.88 100.12 164.88 -6,520.30 1,602.91 3.500 1,290.98 561.25 781.27 Pass-Major Risk 11,950.00 8,934.95 11,650.00 8,343.66 249.88 100.38 165.89 -6,538.76 1,605.79 3.500 1,298.71 561.61 785.05 Pass-Major Risk 11,950.00 8,934.95 11,675.00 8,360.28 249.88 100.63 166.88 -6,557.25 1,608.48 3.500 1,306.92 561.96 789.49 Pass-Major Risk 11,950.00 8,934.95 11,700.00 8,376.91 249.88 100.88 167.87 -6,575.75 1,610.96 3.500 1,315.61 562.31 794.57 Pass-Major Risk 11,950.00 8,934.95 11,725.00 8,393.56 249.88 101.13 168.84 -6,594.26 1,613.27 3.500 1,324.74 562.65 800.28 Pass-MajorRisk 11,960.46 8,934.98 11,750.00 8,410.24 249.88 101.38 168.56 -6,612.74 1,615.51 3.500 1,334.11 543.62 822.45 Pass-Major Risk 11,962.16 8,934.99 11,775.00 8,426.96 249.88 101.63 169.31 -6,631.20 1,617.67 3.500 1,343.94 540.77 832.04 Pass-Major Risk 11,963.80 8,934.99 11,800.00 8,443.72 249.88 101.88 170.06 -6,649.63 1,619.76 3.500 1,354.14 538.03 842.10 Pass-Major Risk 11,965.39 8,934.99 11,825.00 8,460.50 249.88 102.13 170.79 -6,668.05 1,621.81 3.500 1,364.70 535.38 852.67 Pass-MajorRisk 11,975.00 8,934.99 11,850.00 8,477.27 249.89 102.38 170.55 -6,686.48 1,623.88 3.500 1,375.71 517.66 876.87 Pass-Major Risk 11,975.00 8,934.99 11,875.00 8,494.03 249.89 102.63 171.45 -6,704.90 1,625.96 3.500 1,386.97 517.95 886.07 Pass-Major Risk 11,975.00 8,934.99 11,900.00 8,510.79 249.89 102.88 172.33 -6,723.34 1,628.05 3.500 1,398.59 518.25 895.76 Pass-Major Risk 11,975.00 8,934.99 11,925.00 8,527.45 249.89 103.13 173.20 -6,741.86 1,630.13 3.500 1,410.68 518.55 906.05 Pass-Major Risk 11,975.00 8,934.99 11,950.00 8,543.95 249.89 103.39 174.04 -6,760.53 1,632.18 3.500 1,423.28 518.84 917.00 Pass-Major Risk 11,975.00 8,934.99 11,975.00 8,560.30 249.89 103.64 174.87 -6,779.34 1,634.21 3.500 1,436.40 519.14 928.57 Pass-MajorRisk 11,975.00 8,934.99 12,000.00 8,576.49 249.89 103.90 175.68 -6,798.28 1,636.22 3.500 1,449.98 519.44 940.74 Pass-Major Risk 11,975.00 8,934.99 12,025.00 8,592.69 249.89 104.15 176.47 -6,817.20 1,638.34 3.500 1,463.83 519.75 953.28 Pass-Major Risk 11,975.00 8,934.99 12,050.00 8,608.95 249.89 104.41 177.25 -6,836.06 1,640.62 3.500 1,477.88 520.06 966.11 Pass-MajorRisk 11,975.00 8,934.99 12,075.00 8,625.26 249.89 104.66 178.01 -6,854.84 1,643.04 3.500 1,492.11 520.37 979.23 Pass-Major Risk 11,975.00 8,934.99 12,100.00 8,641.63 249.89 104.92 178.76 -6,873.57 1,645.57 3.500 1,506.53 520.67 992.63 Pass-Major Risk 11,975.00 8,934.99 12,125.00 8,658.08 249.89 105.17 179.50 -6,892.24 1,647.95 3.500 1,521.19 520.98 1,006.35 Pass-Major Risk 11,975.00 8,934.99 12,150.00 8,674.60 249.89 105.42 -179.77 -6,910.87 1,650.15 3.500 1,536.08 521.28 1,020.40 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/6/2015 3:37:48PM Page 22 COMPASS 5000.1 Build 61 • 11. ~—I, . — 8 LL M I a N K i "• C! O 6 U S sa $ C. 11S 2 s" mIy e ♦ f, O r m 223 11 i 111 a m ..." i . Ilil Elk q 17 MI 31 li 03 r4 ■ I aIa ■ ' � o ' u 2 � I ' i ; U Ui ce m 6 3 G A n .2 N f 0 0 e. 0 C3 m 2 Q m I 4 s 1 C s i m �/'�.. II1-2 1 O 1111 0 4) ' - III ... u. Y 1 — 111 2 I = — \ n 0 _ 0 N ' T ■■LL����II m Q c ( LL =12 F - - Ili 2 III 2 2 A � I U Cl II II :ii l. I11 v I g c ill z Q P > > WU ° 1 111 III J °m I II (9 ilk hi RI OJ E A/ r • 111 U I111 o n ' W '� 4 a' 1 u v a a 8 W g 0 I 11 N , _ rc V y/ f S J e: Q I CN - ti i ' o O m Z o I a a m 11 e cm I o + c wigwam. ra . I y a I : I' 1 • I : Ill yq e i. " ¢ C iR >. o s- ,,, .. I I.I m m Y .2 III " mi i • f CO)' M k1=1�I : Illi ^ > - i TREE= 4-1/16'CNV I SA TOTES:*"4-11r CHROME TBG•" Wall*"''' CNV7*SUFWCK PROP .iAL X-1 O ACTUATOR= BAKER C N11AL •KB.ELE 74.94' •I ♦♦ BF.ELEV= 40.79' `I� tit KOP= 3100' 20'C)N OUCTOR ? At4,k �r L_ 2120' -141/2"HES XMP,D=3.813' Max Angle= — P��.• , Datum MD= Datum ND= 8800'SS : TREE= 4-1/16"CNV WELLtEAD= CNV7"SLFLOCK II 0 SA, IOTES:"'4-1/2"CHROME TBG'" A(XUATOR= BAKER C INT1AL KB.ELE 74.94' '.1 .4, g I . BF.ELEV= 40.79' --._ KOP= 3100' [20-CONDUCTOR 1—{ ? I Max Angle= 47"@ 6600' -:',...'-i: i I 1 ;'y' 2120' —4-1/2"HES X NP,13=3.813" Cetum MD= 10591' w Datum TV D= 8800'SS 't. v* 2589' 9-5/8"DV PKR .; _ 9-5/8"CAC STUB(04/30/13) H 1702' * !� ✓ w , GAS LFT MANDRELS 13 3/8'CSG,72#,L-80,13=12.347" H 2677' ST MD TVD DEV TYPE VLV LATCH FORT DATE • s 5 3227 3221 15 KBG2 DOME BK 12 11/29/14 �+ II . 4 5458 5010 42 KBG2 DOME BK 16 11/29/14 Minimum ID = 3.725" @ 9993' . y * 3 7219 6249 46 KBG2 DOME BK 16 11/29/14 ,+ + 2 8581 7254 38 KBG2 DOME BK 16 11/29/14 4-1/2" HES XN NIPPLE t . 1 9610 8107 34 KBG2 SO BK 28 11/29/14 r f k; ' �-- � 9770' (—4-1/2"HES X NP,D=3.813" v r r 0----1-1_ T 9794' —7'X 4-1/2"HES TNT PKR,D=3.856" 7"SCAB LW,26#,L-80 VAM TOP HC, H 9918' r+ ' �- 1 9917 4-1/2"HES Xtom,D=3.813' .0383 bpf,D=6.276" sss ■ i :., TOP OF 7"LNR -1 9918' 9993' I—4-1/2"FES XN NP,ID=3.725' 4-1/2'TBG, 12.6#,13C R-85 VAM TOP, —I 10004' / 10006' 4-1/2"WLEG,D=4.00' .0152 bpf,D=3.958" - 1 H H-MD TT NOT LOGGED 9-5/8"CSG,474,L-80 BTRS,D=8.681' —I 10433' ' PERFORATION SUMMARY I RE=LOG:BHCS ON 07/25/80/CBL ON 07/27/80 111-1 ANGLE AT TOP PERF:36"@ 10714' 10669' 1-17-MARKER JONT — Note:Refer to Production DB for historical perf data_ SIZE SPF INTERVALOpn/Sgz SHOT SQZ _ 2-7/8" 4 10598-10618 S 01/08/89 11/17/90 3-3/8" 6 10714-10740 0 12/24/90 I 2-7/8" 4 10742-10752 S 01/24/81 11/17/90 2-7/8" 4 10760-10767 S 01/24/81 11/17/90 I 3-1/8" 4 10767-10784 S 06/19/88 11/17/90 3-1/8" 4 10794-10818 S 06/19/88 11/17/90 10808' I FISH-CEP(PUSFD DH BY RIG 05/07/13) PBTD —I 11497' 11111111 111111111111111 7"LNR,29#,L-80 BTRS,.0371 bpf,D=6.184" --I 11555' 1.1.1.1.E0.41 DATE REV BY COMMENTS DATE REV BY COMMENTS FRUDHOE BAY UNIT 07/28/80 INITIAL COMPLETION 09/11/13 TBLYJMD GLV C/O(08/29/13) WELL: X-10 12/15/90 NI B5 RING 12/11/14 WRP/JMD GLV C/O(11/29/13) PERMIT No: 1800430 05/09113 D-14 F VO API N43: 50-029-20467-00 05/16/13 PJC DRLG DRAFT CORRECTIONS SEC 7,T1ON,R14E, 476'FNL&479'FEL 05/19/13 SF/PJC GLV C/O 05/21/13 SW/PJC FNAL DRLG CORRECTIONS BP Exploration(Alaska) Loepp, Victoria T (DOA) From: Boltz,Travis <Travis.Boltz@bp.com> Sent: Thursday,January 22, 2015 11:44 AM To: Loepp,Victoria T(DOA) Cc: Lastufka,Joseph N Subject: RE: PBU X-10A(PTD 215-004) Max Reservoir Pressure Victoria, You are correct our TD is deeper than the 8800'TVDss datum and that increases the MASP and max reservoir pressure. I have sent an email to the CTD group to ensure that we report our reservoir pressure in our permits from the deepest planned TVDss along the well path and not the 8,800 TVDss datum. Thank you. For X-09B failing anti-collision our risk mitigation will be to shut-in and lock out/tag out for drilling operations. Respectfully, Travis Boltz Coiled Tubing Drilling Engineer Cell:502-640-1645 Office:907-564-5750 From: Loepp, Victoria T(DOA) [mailto:victoria.Ioepp@alaska.gov] Sent:Thursday, January 22, 2015 9:43 AM To: Boltz,Travis Subject: RE: PBU X-10A(PTD 215-004) Max Reservoir Pressure Travis, The reference depth at sea level vs RKB or GL is a minor issue. But reporting the maximum reservoir pressure at 8800' ss versus at TD is significant with reservoir pressure and MPSP at TD being the worst case scenario. In the case of X-10,the MPSP and max res pressure are 74 psi higher at TD versus ss. What do you think? Victoria From: Boltz,Travis [ma ilto:Travis.Boltz@)bp.com] Sent: Wednesday, January 21, 2015 7:01 AM To: Loepp,Victoria T(DOA) Subject: RE: PBU X-10A(PTD 215-004) Max Reservoir Pressure Victoria, The RKB your referring to is not the RKB of the Nordic Rigs in CTD. In CTD, we tie into the parent surveys. So the RKB we report is the RKB of the parent, not the rig. We decided as a group to use TVD at sea level to calculate MASP in order to simplify calculations and report the worst case scenario with gas to surface. Respectfully, Travis Boltz Coiled Tubing Drilling Engineer Cell:502-640-1645 Office:907-564-5750 1 From: Loepp, Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent:Tuesday, January 20, 2015 10:39 AM To: Boltz,Travis Cc: Lastufka,Joseph N Subject: RE: PBU X-10A(PTD 215-004) Max Reservoir Pressure Could you provide at ref RKB instead of 55- Thanx- From: Loepp, Victoria T(DOA) Sent: Tuesday,January 20, 2015 9:46 AM To: 'Boltz,Travis' Cc: Lastufka, Joseph N Subject: RE: PBU X-10A(PTD 215-004) Max Reservoir Pressure This email will suffice. However,the maximum reservoir pressure and datum needs to be reported in the future on the CTD 401s as well as the MPSP calculated. Please communicate this within your organization. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W 7th Ave,Ste 100 Anchorage,AK 99501 Work (907)793-1247 Victoria Loepp(a)alaska.Qov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.Loedd@alaska.aov From: Boltz,Travis [mailto:Travis.Boltz@bp.com] Sent: Thursday, January 15, 2015 3:46 PM To: Loepp, Victoria T(DOA) Cc: Lastufka, Joseph N Subject: RE: PBU X-10A(PTD 215-004) Max Reservoir Pressure Victoria, You are correct. My TD of 8,997'TVDss would result in a different MASP. 8,997'*(0.052)*7.3ppg= 3415 psi 3415-(0.1psi/ft*8997')=2535psi In my calculations for permits, I used a base reference datum of 8800'TVDss. Will this email suffice for documentation or do you require additional documentation? Thank you. 2 Respectfully, Travis Boltz Coiled Tubing Drilling Engineer Cell:502-640-1645 Office:907-564-5750 From: Loepp, Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent: Thursday, January 15, 2015 3:02 PM To: Boltz,Travis Subject: PBU X-10A(PTD 215-004) Max Reservoir Pressure Travis, The reservoir pressure of 3341 psi is provided at 8800'TVDss however wouldn't the maximum reservoir pressure be at the TD(TVD)?The calculated MPSP would also be different. Please provide calculations. Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W 7th Ave,Ste 100 Anchorage,AK 99501 Work- (907)793-1247 Victoria LoeppCcilalaska qov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Ferguson at(907)793-1247 or Victoria.Ferguson@alaska.gov 3 OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST ., WELL NAME: PTD: Development Service Exploratory Stratigrapluc Test Non-Conventional FIELD: `� �+� POOL: ! .ae�-e- (-0/ Check Box for Appropriate Letter/ Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI LATERAL The permit is for a new wellbore segment of existing well Permit (If last two digits No. , API No. 50- - - - in API number are Production should continue to be reported as a function of the original between 60-69) API number stated above. In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name Pilot Hole ( PH) and API number (50- - - - ) from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce / inject is contingent upon issuance of a Spacing Exception conservation order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: Production or production testing of coal bed methane is not allowed for Non-Conventional (name of well). until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application,the following well logs are Well Lo ,n also required for this well: gg g Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 4/2014 13 O o 0 0 (- -0 -• - a -I r O 1 7 3 0CI CD N ; 3 no 0 _ CD = m o fl1 O N r�i N .„i N D) O 0 3 7 C) Oo (D o N O0 A CD CI1 01 CO CO CO CO w CO CO CO CO CO N.) N N.) N) NJ N N N N.) N.) — — CO CO V 0) 01 A CO N -, 3 co (>o V D) 01 A CO N) -, 0 CO 0) V 0) 01 A CO N -, 0 CD 03 -1 D) C)) A CO N -, 0 ° O cn C/ o � v � n WW0 , D . DC � � CcnCZ � D � n '0 'DOO � � � � CNm � 0 0 CD CD N CD D 0 C- O O = o n pn CKKKc o o 3 = DN coCD 'O O n C CD CD D B. D ° o -0 co r IT? 133 n n 3 C) 7 0 -0 0 P- N C1 N 0 O O N 0 7 0 C- 00 CD 0 0 0 0 N 5 00 0 00 (D 7 m �. ✓ o Cl) (n CO v 0 a, m 0- c m o -' 0 CD (n a, 0 0 m a *. ) 3 7 7 T o a m n) vCI L< c m Ix -'1 N 7 I. ?. Cn 0 E N N V) 8 n n y .N•. 7 C) CL CD + N 7 CD CD (D N = 3 (3D ° < CD N 00 o N 5 'O a 0 n) = (7 N 7 -, co• a > CS tS Q N .. 0 N O ° n N - 0 TI -o (3- T. n m n 3 ,� o Q (n n) CO c c m 3. m m (D ° 3' v O n o N ° S m m o 0 (o m (n (n -O (O 0 2. a) rn rn '0 m (0 0 0 0 3 Cy () Zl a 0 y 0 7 C 7' O (Q 3 3 9- CD _, CD a -, CD N p -0 00 0 A 7 -o c c n Q o CD CD 0- (D a CD ',H pe (D c (n 1° a 7 (o 0 3 v 3 0- (n o 2, 7 0 o CD o 7 0 3 d o a a p 0 0 % 0. m Co 0 ° m 2 s o a, , pro �, o 0 a c o o <_. o :. - < n m 0 -. -. o n 'a O o m o (D v m f o (n m 0 (D v o 3 o F - (n n m v a *. *• m -a a . rn y a 7 z CO4 a N c tU Q SS (� Cy (S 77 C SU Dilifli 3 a w n CD cc o 0 00 03 m r m a ° 3 =• ° a ° 7 0 0 > > (�, (D o — Dc0 _. =. O v m 7 0 ° v a • 0 0 u 0) >ci o w `� o- o °' c a o o m o -a m 0 m 0 X 0 Q, a ° _. ( 7 7 j 0 m' 3 > > a - 3 3 D CD(0 -° p p 7 Cn N 'O n CD () < N Cn . Cn CD — 0 o ° S m 0 0 o pC) (D o C -O m' ° (i 5. (D 0 n 5 o o m co al ai co c O a w ° �' °a 3 Ro 0 n 0 ! !JZI 0D < 7 N "' (7) N7 c N (� C m3�; Cb n �, n CS C N N CD A CO CD 7 0 (D to D O n CS 'O O O �J citi °" 7 C Nom.. a. C O m 0 7 2 _S-' O X Voi O O N 'O n N• N O� N N a O 3 m o co D Cn (n m m0 r'\ 0 C7D n 0 7 O. 7 F Cj 71; w CD Oca (D d A 7 * O CD CCD O O N O» 0 01 S 7 • � � 7 o.O O 7 II (1 0 • cn v\ Z Z Z -< z z -< -< -< -< -( -< Z -< -< -< -< -< Z Z Z Z Z Z Z Z -< -< -< -< -< -< -< -< -< -< -< -< Z N D D D (CIA 0 > 0D n n n nD n > n n n n n D D D D D D D D n n m n n n n n n m n W > 0 m m < CD c 20 X N N 7 -1 0 a CO Cn C 0 0 O -O OO xi O Z < CO cn x 0 7' c o0) o0) a o C CO C m O (D a * CD 1:1 O a o u01) m m 3 ° 2 CL Z (0 n (D a) N w o c) m <m v w o `n 7 o m 7 m 3 A CO. 0 O N x O CD FL; 3 co N • 7 W co_fD 7 7 7 .o. O * c W D o Cn m m (o o D m m n m 7 O y CO C 7 Z co Cn O O = •N ;< CD CO C N I. -. cn N d N CO CD C'D W CO Q • O (b X GV) W c. W (n *. v 7 (n Il (fl C O c (n z m m C 0 0 3 C o O 0 .O p N a CD 00 w 6 W X A 2 (o Vj o c 7' 2 o 0 (° 3 �. w (" N c 0 CD 7 0 m 3 (� = A m - m 3 0 x n) 01 d m o co co t CD (n m D) 0 _° 3 0 00 = 0 D< d) N 'O x N ET) CD CD r "O y (�. O '"6d CD' 7 CD 7 - () C -o co n CD (CD o O c Z (O 3 a W coo * n CO 0 < s m O 0 X .0 0 p Fo a 3 (n r CD (D (wl) y O_ coO (D .(�.. A Po O n) (n o 3 .D 3 0 0 o -i > CO m ° m 7 7 N ul n CO 0 0» n • n- 0 C C _ ,� 0 '0 0 < 0 - CO N a o 3 0 0 I o a CO - C 3 = CD N O O O o- 8 0 co n CO co 0 co D CS 7 co — = CCD C). 0 W j n O~ 7 (D a O CO Er (O a m O * Cl) Cl) X '0 Cl) o 0 a o 0° a 0 a O 3 0 co5 O O 0 O c C, -0 7• m a; c o m v cn < °) 7 D 0 o (o m 7 ° 0 0 m O CDCO (D CL ° r v cn o o — N V 0 O. - 7 A N CC)) 7 CS (O CD D CCD - ) o O O (n a co 0 Cn Cl) ❑ 0