Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout215-012CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Regg, James B (OGC) To:AOGCC Records (CED sponsored) Subject:FW: OPERABLE: Producer G-16 (PTD# 2150120) MIT-T Passed Date:Monday, November 7, 2022 11:39:40 AM Attachments:image001.png image002.png PBU G-16B (PTD 2150120) Jim Regg Supervisor, Inspections AOGCC 333 W. 7th Ave, Suite 100 Anchorage, AK 99501 907-793-1236 From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Sent: Sunday, November 6, 2022 7:10 AM To: Regg, James B (OGC) <jim.regg@alaska.gov> Cc: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Stan Golis <sgolis@hilcorp.com>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com> Subject: OPERABLE: Producer G-16 (PTD# 2150120) MIT-T Passed Mr. Regg, Producer G-16 (PTD# 2150120) passed an MIT-T post GLV change out on 11/05/22 which verifies tubing integrity. At this time, the well is classified as OPERABLE. Please call with any questions or concerns. Ryan Holt Hilcorp Alaska LLC Field Well Integrity / Compliance Ryan.Holt@Hilcorp.com P: (907) 659-5102 M: (907) 232-1005 From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Tuesday, September 5, 2017 6:12 PM To: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com>; AK, OPS EOC Specialists <AKOPSEOCSpecialists@bp.com>; AK, OPS GC1 Facility OTL <AKOPSGC1FacilityOTL@bp.com>; AK, OPS GC1 Field O&M TL <AKOPSGC1FieldOMTL2@bp.com>; AK, OPS GC1 OSM <AKOPSGC1OSM@bp.com>; AK, OPS GC1 Wellpad Lead <AKOPSGC1WellpadLead@bp.com>; AK, OPS PCC Ops Lead <AKOPSPCCOpsLead@bp.com>; AK, OPS Prod Controllers <akopsprodcontrollers1@bp.com>; AK, OPS Well Pad EKG <AKOPSWellPadEKG@bp.com>; Ak, Ops West Area TL <AkOpsWestAreaTL@bp.com>; AK, RES GPB East Wells Opt Engr <AKRESGPBEastWellsOptEngr@bp.com>; AK, RES GPB West Wells Opt Engr <AKRESGPBWestWellsOpt@BP.com>; Oshiro, Joleen <JOLEEN.OSHIRO@bp.com>; 'Regg, James B (DOA) (jim.regg@alaska.gov)' <jim.regg@alaska.gov> Cc: AK, GWO DHD Well Integrity <AKD&CDHDWellIntegri@bp.com>; AK, GWO SUPT Well Integrity <AKDCWellIntegrityCoordinator@bp.com>; AK, OPS FF Well Ops Comp Rep <AKOPSFFWellOpsCompRep@bp.com>; AKIMS App User <akimsuser.service@bp.com>; Cismoski, Doug A <CismosDA@BP.com>; Daniel, Ryan <Ryan.Daniel@bp.com>; Dempsey, David G <David.Dempsey1@bp.com>; Hibbert, Michael <Michael.Hibbert@BP.com>; Janowski, Carrie <Carrie.Janowski@bp.com>; Montgomery, Travis J <Travis.Montgomery@bp.com>; Munk, Corey <Corey.Munk@bp.com>; Obrigewitch, Beau <BEAU.OBRIGEWITCH@bp.com>; O'connor, Katherine <Katherine.O'connor@bp.com>; Sternicki, Oliver R <Oliver.Sternicki@bp.com>; Tempel, Joshua <Joshua.Tempel@bp.com>; Worthington, Aras J <Aras.Worthington@bp.com>; 'chris.wallace@alaska.gov' <chris.wallace@alaska.gov> Subject: NOT OPERABLE: Producer G-16 (PTD# 2150120) Failed primary barrier, well secured with downhole plug All, Producer G-16 (PTD# 2150120) was made under evaluation on 8/31/17 for having sustained inner annulus casing pressure above NOL. On 9/5/17 slickline set a tubing tail plug and performed a failing MIT-T, and passing CMIT-IA to 2,500psi.. The failed MIT-T confirms integrity loss of the primary well barrier. At this time the well is reclassified as Not Operable and will remain shut in and secured with a down hole tubing plug. The production engineer will evaluate the well for future utility. Please respond with any questions, Joshua Stephens Well Integrity Engineer Office: 907-659-8110 Cell: 907-341-9068 From: AK, GWO Well Integrity Engineer Sent: Thursday, August 31, 2017 8:58 AM To: AK, OPS EOC Specialists; AK, OPS GC1 Facility OTL; AK, OPS GC1 Field O&M TL; AK, OPS GC1 OSM; AK, OPS GC1 Wellpad Lead; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; AK, OPS Well Pad EKG; Ak, Ops West Area TL; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr;Oshiro, Joleen; 'Regg, James B (DOA) (jim.regg@alaska.gov)'Cc: AK, GWO DHD Well Integrity; AK, GWO SUPT Well Integrity; AK, GWO Well Integrity Well Information; AK, OPS FF Well Ops Comp Rep; AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael; Janowski, Carrie; Montgomery, Travis J; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Sternicki, Oliver R; Tempel, Joshua; Worthington, Aras J; 'chris.wallace@alaska.gov'Subject: UNDER EVALUATION: Producer G-16 (PTD# 2150120) Sustained Inner Annulus Casing Pressure Above NOL All, Producer G-16 (PTD# 2150120) was reported to have sustained inner annulus casing pressure above NOL on 8/30/17. The pressures were confirmed to be tubing/inner/outer = 2470/2460/130psi. DHD performed a subsequent failing TIFL on 8/31/17 indicating a lack of two competent well barriers. At this time the well is reclassified as Under Evaluation and is on the 28 day clock for diagnostics and repairs. Plan Forward: 1. Slickline: Set Tubing tail plug 2. Fullbore: Assist SL, MIT-T, CMIT-TxIA 3. Production Engineer: Additional diagnostics as needed Please respond with any questions, Joshua Stephens Well Integrity Engineer Office: 907-659-8110 Cell: 907-341-9068 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considersappropriate. STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMMIS ON REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations ® Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown 0 Suspend 0 Perforate ® Other Stimulate 0 Alter Casing ❑ Change Approved Program ❑ Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: $et C/5P l 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number 215-012 3. Address: P.O.Box 196612 Anchorage, Development Gd Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20643-02-00 7. Property Designation(Lease Number): ADL 0028285 8. Well Name and Number: PBU G-16B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIVED Total Depth: measured 12502 feet Plugs measured See Attachment feet C true vertical 9013 feet Junk measured feet SEP „ i�il & 7 2017 Effective Depth: measured 8669 feet Packer measured 8570 feet r4�*v. true vertical 7803 feet Packer true vertical 7713.68 feet ii Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"Conductor 39-119 39-119 Surface 2646 13-3/8"72#L-80 38-2683 38-2683 4930 2670 Intermediate 9311 9-5/8"47#L-80 36-9347 36-8423 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 9388-9408 feet feet 11275-11305 feet 11305-11335 feet 11335-11365 feet 12040-12130 feet 12282-12462 feet True vertical depth: 8461-8480 feet feet 9035-9035 feet 9035-9035 feet 9035-9035 feet 9019-9022 feet 9019-9015 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 34-8714 34-7843 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): NOVQ ) Treatment descriptions including volumes used and final pressure: SCAN��� NO 0 8 "0 1 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 76 4855 2 1700 186 Subsequent to operation: 234 45992 5 2400 1078 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations H Exploratory 0 Development LZI Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil IBJ Gas 0 WDSPL ❑ Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG ❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Oshiro,Joleen Contact Name: Oshiro,Joleen Authorized Title: G Pad Engineer/New Wells Delivery PE(GC1/FS3 Contact Email: JOLEEN.OSHIRO©bp.com Authorized Signature: 0��--- ... Date: 1/2 1 1,--) Contact Phone: +1 907 564 4606 Form 10-404 Revised 04/2017 r de�O /6 1 1' RBDM3 L (0 ry r[^.n 7 SG�i ,�V l'��3 •' 3 �`�;I? Submit Original Only • • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RECEIVED SEP 272017 RE: BP Exploration (Alaska), Inc. Report of Sundry Well Operations Summary AOGCC September 26, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for Setting of Plugs and Addition of Perforations for Well G-16B, PTD # 215-012. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage,AK 99519-6612 • • Plugs Attachment PBU G-16B SW Name Date MD Description G-16B 09/06/2017 8669 4-1/2" PX Plug G-16B 08/30/2017 9789 2-3/8"WFT CIBP G-16B 10/09/2016 11975 2-3/8" Baker CIBP G-16B 02/25/2016 12210 2-3/8"WFD CIBP • • CD Q, 00000000 CD ao o „ °0 0 cDN NLC) vLO C N LC) CO f- Ln I� C) 0 0 0 0 0 0 0 0 N O C Cr) CO LO O 03 CO M 00 N N t` N CD Nr CO CO 00 O CO N CO N- t\ 00 CA I- I CI N- M Lf) 0) CO CDCOCDONNJ' CDO � co co M O co co C) CO N r- N- r- CO OMr- Ncov4NO � co CA N- d N- N- CO CO CD f- I• M N- CV C) CO 00 CO C3) CO o M I 4-1 W Q r CO CA 03C0000)) � C) N • 1 M M M O O N- CO M CO C N CO 00 00 CA ._• M I- W EL 0O O co 0 C1- O 00000 i Oco0 C> U -� J co J J O J M N � *kN � CD C N U -00 N N N U pe) L) F-- J - N "' (V 4 — lt') 0 O t? •- CO 1- CO CO = 00 CO CO CO N N J NCACD HMCo UJ C en=Q - U ww Z U-1 LLI LU LU LU LLI Q j I— Z Z Z Z Z D U fn Z J J J J J I- • • Packers and SSV's Attachment PBU G-16B SW Name Type MD TVD Depscription G-16B PACKER 2018.79 2018.69 7" Liner Top Packer G-16B TBG PACKER 8570.49 7713.68 4-1/2" Baker S-3 Perm Packer • II • N 0 O N .0 W Z c`l Q k .- p 0 o co a._c o Z rn32 rn CIO _ Ii F- L QO U Y (/) = c Q p O m 00 m !A O Z J N a el.7, p J >, c 0 W o LL 0 0 o c cc) p p N LL QN N C. a = - 0) u) -* • E � Z = 0 c �) o m ' El co --I o 1.7-(- I- a o 73 m I- ce oa ac) 0_ -3 < U aa)) = o wH a °- Z Q 5 2 w ` N � F- a m ' a. -02 cc W QN o = < 0) Q 01,..„ o_Qm a aO O _c c § ZW co a ` O w a rn N W al o z o 0 z s O >- 00 > 1_ ct N t _o a) J � it0 mU * Z OIL U Q c < F- v) ° 0 < I c -0a W ;; • 0p a>> ._ 7 WO W 2W < -16 co a) mQ000_ a 0 °- '' I- Ow O. a) J N W O a a($ O Q 0_ O_ N J \ a C D W I I ~ LL O .a m , I * JTr p LI 0 mm ? m p ¢ rte _ *w WLL. v o m w2NP J1- Wu• W a ,r (5 * aaowCC r- <C -o _cp - 00 ` r W a 2 CL Q N M a a J ° o �. OCO ~ Z S � Op oa � rn (n N 3 � C7 _Ir.:- \ F- H � o N � II Qw LL13 O %� O0co 44- M -a a O a N ° ' H cco O 0- J ct O D ~ co M II c m o w �I' 0 * p N ppQO p _ O � Q ' E) a) 0 F- O t p, Q W Xaw- p H O ? * oQ') c"wc 0 p II 'cN <-(7) (1) Uii D *' maUa > E 0Q a V J � NXI- aQ O Q0_ 0 - � * ** m0_ ,, LLI re Ro = F5aM m 11- --- = ? w M CD * * ma i. zD < m F- mQMO (7pm0 H a � OJ aNX (/) �- >+ coQOwLLjOZ O - p � - w I- 0 c II < co z (q0_ .� zd. - 2F- O o ats cLL. wi_ coF- 0o m u > > � = - QQ CI 0aWopw H owCCwZ 0 � aa)) � 2OmCC cv - OaW Zvw � � p O - c 3 0) c-, F- O m= LQ � 1- > D ° p N W 0) J Z ( m ami c z w = O W J L > 0) m z a 1 2 Q a 2 Z O Q rn c pWpawD_ U m II OU O0XO_ O _ Q Q ~ a z o 23 - rn o Z a a - U w 2 o c c > a Z W W a 0 JJ JOO � ao c � O = 6 ° 01- ONHa uJu) OHQ � = -J WQ 0_ 0m II op m w 2! ..,E II Jazz0 7t. ELL! � = 1- 0q O - mo � aJaoo , U0w = OO -j - W * Z w0 * o i_ : * = = WOW * ` .c m > zz * ODU0CUJ * - a' (/ J * F- tnt * * CCO- 5F- p * H E �-. (/) H * � * * J (nJ * w F- Q ti N- N- N- N- N- r- a 0 0 >- 00 0 0 F N N N N N N N W O O > N co co M , V up 0 co op op a5 O O co Q . e • Q aQ rn " ui a) < 0 co O J17) * _ - * • L a) •N O W a-0 vi m -) oQTaH o tai Lo v ami • N coo C) ami 2 LL � Q =-m 05 46 Q In N Oa c OO - „„= '- (0 as Cfl («0 ,n v N o a) a) s- N10 I- N ._ L u) -1-• H (j N N I. a) o - O. a) E '4e= HO +-' O -0 o E a) o (A to d Q (/) >' Q Opp OL a)01 0 U) I- 70 Om CNor, 0 �5 O a 3 LL o m , O o Cr O a � Omo CD (7) U ~ 0 a) U •N E JD ° cn CU Q Q 3 T- C) U) 2-0 a) ON C Q o 73 E - o ✓ a) o N Y d M W N - c O O co - w ._ N M CV m E 73 H CD a p E _ H 0_ co 73 4i (NI 00 r- O co , N N- In ij CO V' ) TREE= 4-1/16"CATVIII YELLlfAD= CIVV (_1 6 B SA NOTES: WELL ANGLE>70°@ 10050'"" MAX ACTUATOR= BAKER C DOGLEG:34.6°@ 9390'`"" 4-1/2"CHROME TBG*** OKB.BEV= 77.08' 1 1 BF.a.EV= 41.53' / 2215' -H4-112"IES X MP,D=3.813" KOP 3500' 20"CONDUCTOR, H 118' Max Angle= 95°@ 10350' Datum MD= 9829' Datum ND= 8800'SS ID= A 1 A — GAS LET MANDRELS i %"' ST ItD ND DEV TYPE VLV LATCH PORT DATE 7"BKR LNC TE BACK,D=7.50" --I 1993' ►0 *, *e , 3 3286 3285 5 KBG-2 DOME BK 16 05106/15 In 9-5/8"X 7'ZXP LTP w/HGR,D=6.276" - 2004' ►'1 '+ 2 7179 6503 35 KBG-2 SO BK 20 05/06/15 Affl40; 1 8467 7620 25 KBG-2 MY BK 0 10/05/03 9-5/8"DV PACKER --I 2585' X ,I� 8636' -4-1/2"LES X NP,D=3.813"j 13-318'(*PG,72#,N-80,ID=12.347" -I 2684. 6 --- Minimum ID = 1.781" @ 9313' rl+o et,' 8667' 7"X 4-1/7 BKR S-3 PKR,D=3.875' BKR 35KB LTP w/QCLUPTSA will NIP ��� R,.r, 6669• -ja 1/r HES NIP,D=3.813" �� 8669' ,i-4-1/2"PX PLUG(09/05/17)i 7"INR 26#,L-80 BTC,.038.3 bpf, D=6276" -{ 8678' CVk Ilk Id ,l 8678' 7"X 5-1/2'XO,D=4.892" 5-1/2"TBG,17#,1-80 BTC,.0232 bpf,D=4-892" 8700' `�j' ri•' ���� tee* 8700' H4-1/2"HALF IIESHOE,D=3.958" 4-1/2"TBG, 12.6#,13CR-80 VAM TOP, -{ 8700' 100 IIS' 0152 bpi,ID=3.958" 100 N` 8700' -5-112'X 4-1/2"XO,D=3.958' 4-1/2"SCAB LNR 12.6#,13CR-80 VAM TOP, H 8723' , 't�I ka. v♦+ 8712' J--{4-1/2"ISS X NP,ID=3.813" .0152 bpf,D=3.958' 6:t l��� 4-1/2"TBG CUT(07/10/03) -1 8735' � c`:I1 II * ���+ 8730' 1--19-5/8"X 7"UN Q E MAC3-11.+E OVERSHOT t1 8761' 4-1/2'X 7"TBG XO,D=3.958" ►Zt ►tet 8761' H9-518'X 5-1/7 SBR,D= " 4-1/2"TBG,12.6#,L-80,.0152 bpf,D=3.958' --j 8795' - ."ter y��►,1 .%%1% 8789' -19-5/8"X 4-1/2'OTIS RH PKR,0=3.93' IId I 4+►♦ �!_'� ►&% 4 $ 8795' H4-1/2"X 3-1/2"XO,D=2-992" TOP OF 7"LNR -1 8853' -40:16., Nr,,... #.4 8853' --9--5/8"X r'iiiif LNR PKR,D=_" 1 01 VI I TOP OF 2-318"LNR(CEMENTED) 9326' ���N N,#,I 9313' -BKR 35KB LTPw/QCLUPTSA w FR NP, ,j1'' "f'1' D=1.781"(10/21/15) *; 601 I % IA 'I'd If 4A, 9326' -2.70"BKR DEPLOY SLV,D=2.25" %9-5/8'CSG,47#,L-80 BUTT,ID=8.681" 9347' t,1 IAA INFER PLUG BUSLING @ 9337',0=1.78' re t� MILLOUT VVf�OW(G-16B) 9374'-9379' 3-1/7 TBG,9.2#,L-80 8RD,.0087 bpf,D=2.992" H -9372' ',4 ie*, 3-1/2'BKR M(NNOBOE WHIPSTOCK(01/29/15) -9372' �..,„ ..` 9789' H2-318"WFT CEP(08/29/17) w/2 RA PIP TAGS @-9377' IP.`'. °' 11243' ---I 2-3/8"PUP JONT w/RA TAG 7"LNR,26#,L-80 BUTT,.0383 bpf,D=6.276' --I -9372' �,i i�'J�' //°!. 4.1. ,i,44 . 11975' 2-3/8'BKR CBP PERFORATION SUMMARY RY `°Ak. ``` (10/07116) REF LOG:BKR ATLAS RFMGR/CC L ON 03/25/15 +, .• '' ,° 12210' -2-3/8'WFD CBP ANGLE AT TOP PERF:15'@9388' �a A ti, (02/25/16) Note:Refer to Ftoduction OB for historical perf data �•:/ .V II 12464' - PBTD SIZE SPF INTERVAL ORMSQZ SHOT SQZ `'� /K''t. 1.56" 6 9388-9408 0 08/30117 � .�. 1.56" 6 11275-11365 C 10/08/164. li%. 0 1.56" 6 1204 -12130 C 02/26/16 'N 4:"2�_ 1.56" 6 12282-12462 C 03/25/15 �'�•, ..r 1 2-318" LW&4.7#,L-80 TH511, 12502' Vrilb- .0039 bpf,D=1.995" DATE REV BY COMMEWS DATE REV BY COMMENTS PRUDHOE BAY INT 10/14/81 ORIGINAL COMPLETION 03/08/16 RRW/JMD SET Cl3P/ADFERFS(02/25-26/16) WELL: G-16B 02/13/88 NI ES RWO 10/12/16 MZ/JMD SET CERA DPERFS(10/07-08/16) FERMI No."2150120 10/05/03 N3ES RWO 08/31/17 KFS/JMD SET CERA (08/29-30/17) API No: 50-029-20643-02 06/18/09 NORDIC1 CTD SIDETRACK(G-16A) 09/06/17 JGUJMO SET PX PLUG(09/05/17) SEC 12,T11 N,R13E, 1865'FSL&2276'FWL 03/26/15 NORDIC CTD SIDETRACK(G-16B) 04/02/15 PJC CONDUCTOR DEPTH ADDED BP Exploration(Alaska) • S Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Tuesday, September 5, 2017 6:12 PM To: AK, GWO Well Integrity Engineer;AK, OPS EOC Specialists;AK, OPS GC1 Facility OTL;AK, OPS GC1 Field O&M TL;AK, OPS GC1 OSM;AK, OPS GC1 Wellpad Lead;AK, OPS PCC Ops Lead;AK, OPS Prod Controllers;AK, OPS Well Pad EKG;Ak, Ops West Area TL;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr;Oshiro,Joleen; Regg, James B (DOA) Cc: AK, GWO DHD Well Integrity;AK, GWO SUPT Well Integrity;AK, OPS FF Well Ops Comp Rep;AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Sternicki, Oliver R;Tempel,Joshua;Worthington, Aras J;Wallace, Chris D (DOA) Subject: NOT OPERABLE: Producer G-16 (PTD#2150120) Failed primary barrier,well secured with downhole plug All, Producer G-16(PTD#2150120)was made under evaluation on 8/31/17 for having sustained inner annulus casing pressure above NOL. On 9/5/17 slickline set a tubing tail plug and performed a failing MIT-T, and passing MIT-IA to 2,500psi.. The failed MIT-T confirms integrity loss of the primary well barrier. At this time the well is reclassified as Not Operable and will remain shut in and secured with a down hole tubing plug. The production engineer will evaluate the well for future utility. Please respond with any questions, Joshua Stephens Well Integrity Engineer Office: 907-659-8110 Cell: 907-341-9068 SCANNED SEP 1 2 201? WO 11644.10 yordils eoloma*We From: AK, GWO Well Inte• Engineer Sent: Thursday, August 31, 201 : AM To: AK, OPS EOC Specialists; AK, OPS G - 'i OTL; AK, OPS GC1 Field O&M TL; AK, OPS GC1 OSM; AK, OPS GC1 Wellpad Lead; AK, OPS PCC Ops Lead; AK, OPS Pro• oilers; AK, OPS Well Pad EKG; Ak, Ops West Area TL; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells Opt Engr; • • Joleen; 'Regg, James B (DOA) (jim.regg@alaska.gov)' Cc: AK, GWO DHD Well Integrity; AK, GWO SUPT Well Integrity; AK, GWO Well In . '. Well Information; AK, OPS FF Well Ops Comp Rep; AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; ',seri, Michael; Janowski, Carrie; Montgomery,Travis J; Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Sternicki, Oliv- •_• Tempel, Joshua; 1 • • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Thursday, August 31, 2017 8:58 AM To: AK, OPS EOC Specialists;AK, OPS GC1 Facility OTL;AK, OPS GC1 Field O&M IL;AK, OPS GC1 OSM;AK, OPS GC1 Wellpad Lead;AK, OPS PCC Ops Lead;AK, OPS Prod Controllers;AK, OPS Well Pad EKG;Ak, Ops West Area TL;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr;Oshiro,Joleen; Regg,James B (DOA) Cc: AK, GWO DHD Well Integrity;AK, GWO SUPT Well Integrity;AK, GWO Well Integrity Well Information;AK, OPS FF Well Ops Comp Rep;AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey;Obrigewitch, Beau; O'connor, Katherine; Sternicki, Oliver R;Tempel, Joshua;Worthington,Aras J;Wallace, Chris D (DOA) Subject: UNDER EVALUATION: Producer G-16 (PTD#2150120) Sustained Inner Annulus Casing Pressure Above NOL Attachments: G-16B.pdf All, Producer G-16(PTD#2150120)was reported to have sustained inner annulus casing pressure above NOL on 8/30/17. The pressures were confirmed to be tubing/inner/outer= 2470/2460/130psi. DHD performed a subsequent failing TIFL on 8/31/17 indicating a lack of two competent well barriers. At this time the well is reclassified as Under Evaluation and is on the 28 day clock for diagnostics and repairs. Plan Forward: 1. Slickline: Set Tubing tail plug 2. Fullbore:Assist SL, MIT-T,CMIT-TxIA 3. Production Engineer:Additional diagnostics as needed Please respond with any questions, Joshua Stephens Well Integrity Engineer Office: 907-659-8110 Cell: 907-341-9068 SCpNt F ` Ft 1 3 U1' wo roes1 41 I ILSTATE OF ALASKA ASKA OIL AND GAS CONSERVATION COMMIS - REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations f3 Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown 0 Suspend 0 Perforate (3 Other Stimulate ❑ Alter Casing 0 Change Approved Program ❑ Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: C 1 6 2 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 215-012 3. Address: P.O.Box 196612 Anchorage, Development RI Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20643-02-00 7. Property Designation(Lease Number): ADL 0028285 8. Well Name and Number: PBU G-16B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: 12502 RECEIVED Total Depth: measured feet Plugs measured 11975/12210 feet true vertical 9013 feet Junk measured feet NOV 14 2016 Effective Depth: measured 11975 feet Packer measured 8570 feet it true vertical 9018 feet Packer true vertical 7713.68 feet AOGC Casing: Length: Size: MD: ND: Burst: Collapse: Structural Conductor 80 20"Conductor 39-119 39-119 Surface 2646 13-3/8"72#L-80 38-2683 38-2683 4930 2670 Intermediate 9311 9-5/8"47#L-80 36-9347 36-8423 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 11275-11305 feet 11305-11335 feet 11335-11365 feet 12040-12130 feet 12282-12462 feet True vertical depth: 9035-9035 feet feet 9035-9035 feet 9035-9035 feet 9019-9022 feet 9019-9015 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 34-8714 34-7843 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): r 7 SCANNED Treatment descriptions including volumes used and final pressure: MA C 2v 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 226 19029 2 600 710 Subsequent to operation: 101 5797 4 740 182 14.Attachments:(required per 20 AAC 25.070.25.071,a 25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory 0 Development 171 Service ❑ Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil R1 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data ❑ GSTOR 0 WINJ 0 WAG ❑ GINJ ❑ SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N?A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature 14lir Phone +1 907 564 4424 Date 11/11/16 Form 10-404 Revised 5/2015 V-T-L Z{/L` ` ` r RBD uS 1 ' 1 6 2015 Submit Original Only 2—// /47� � V NOVOV LU • • C, Q.• C) CO CO CO CO CO 00 CO • CO r 00 53 r 53 O N V Cn (O N- CC) , N- U - o 0 0 0 0 0 0 0 i 01 I— Cr Cr CO v' co cv 3C)) CO N I- ' N m cr CO f— f— 00 r- 00 01 Ch M 1() O 00 CO CO CD 00 N N Cr I- Cr CO 00 00 00 Nr O CO N 00 f— f— N- 00 CA N- i . F-- r- co 141 C)) M CA CO (O O N V CO O NI- Ch co co 0 CO 00 CD M N I— N- ti 00 Q) CA 00 I- N CO V NO CO M CO N- N- C`') N N- • N CA 00 CO CO 6) N CO ✓ 0 Ca 111111111 0.1 . QCO N CO 01 CO r CA CO CO CO O) — CO N V co co co 0 CO I� 00 M 01 _• '^ N CO CO CO 0) O CD CD CJ 0O0 CD Cb p J CO Cp 00 (X)J Ch CD � 5 J oo J 00 J 73 Cq ap -Jr U) 5 oO *k cam- *k Nr CO CO RS � U0OaONN _ Nc- U ED tr) r N- 'Jr) N U 41 N V 4▪ (0 — Cn (D O 0 CO V 00 co N N- co • 00 CO M co N N 4i ,- (O d N C)) C9 CO CO -J W � Q _0 U W Lj ' W ZcWWWWWWm ODF- Z2!12! ZZD U U) z J J J J J F- • • Packers and SSV's Attachment PBU G-16B SW Name Type MD TVD Depscription G-16B PACKER 2018.79 2018.69 7" Liner Top Packer G-16B TBG PACKER 8570.49 7713.68 4-1/2" Baker S-3 Perm Packer G-16B PACKER 9313 8390.8 3.7 Baker KB Liner Top Packer S • E \ G� G � 0)\ / 2 \ e � \c) •- 0u_ E \k E Irmc _ o ) $ Q z0 / 2 a 75_ a) a e @ e e m b co 3 \ t o ° 12 a o etR N7 / _ � E& Ek � � � -) LU„ © uui i I m c / m I « O 5 = 0 x 2 f E \ co \ 0 \ \ t LL u Q Z 9 � . 0 0 2\ $ \ g $ \ 7 / = R e E e C < / O \ / 0-1 / . 0 0 o ® o % E RI \ \ o k co0) a / _o m « 2 % O E o to 2 U _Z / D / k 0 0_ - t e / % CL co R 0 / a 0 a" = 0 o \ E / cn ® Oco $ ® a / „ 2L- oaL- o ± 7 a) a o \ $ \ \ 0 � � 0 � \ ƒ _ ± « 0 ' = CO ,_ _ © I I t p / I I Cl: ƒ / Ct (") E o « / 2-\ o 0 - 000 S t 0 . . . e at - a= m o m o k f 5® 0 ° 0)°O : _ 0. ¥ 0 R _» G .E + co 0- e n co G 0 � ¥ m \ ® � J O \ m / / / 0) ow1ba % _/ /d 0 c -o10 co c c) Co � � 0 ▪613 f 2 m 2 % / g n § - / / E \ 2 O = § = 7 o x E 2 c = e / 't,,, o O : ® / \ k E / a_ 2 � \ 5 O _ .§ t = U / oma = 2 = U _ $ _ \ � 0- � ? � CU o Ct ® 2 2 E f - o o / / : k 0_I t o_ / / / o 0 $ * / \ I = # 2 \ $ \ E $ = k _ca / D 0 0 = g e o o o = ± o f R 2 O Q R a o E D \ E B Q R 2 7 o U 0 2 2 I t 0 x- 0 = 2 _ _ ± t O I i r Y •2 < CO CO 0 I- \ \ / / G \ w co a 1A © R \ \ / 0 < 1 TREE= 4-1/16"aW WELLFEAD= CM/ + 1 DOGLEG:346E@ 9 90'L ANG/2"CHROME TBG"-- MAX ACTUATOR= BAKER C OKB.ELEV= 77.08' I BF.ELEV= 41.53' / 2215' -14-1/2"FES X NP,D=3.813- KOP= 3500' 20"CONDUCTOR, - 118' Max Angle= 95°@ 10350' -#, # ,` ��' Datum MD= 9829' ' Datum N D= 8800'SS ID= " /- - GAS UFT MANDRELS ! }// MD TVD DEV TYPE VLV LATCH PORT DATE 7"BKR LNR TE BACK,D=7.50" -{ 1993' 3 3286 3285 5 KBG-2 DOME BK 16 05/06/15 9-5/8"X 7"ZXP LTP w 1HGR D=627fi" -, 2004' rill 2 7179 6503 35 KBG-2 SO BK 20 05/06/15 1 8467 7620 25 KBG-2 DMY BK 0 10/05/03 9-5/8"DV PACKER -r 2585' - 13-3/8"CSG,72#,N-80,D=12.347" H 26$4• 8536' H4-1/2"FES X NP,D=3.813" Minimum ID = 1.781" 9313 $557• --17"x 4-1/2"BKR S-3 PKR D=3.875"- BKR 35KB LTP w/QCLL/PTSAw/R NIP �3 8669• H4-1/2"HES xNP,D=3.813 7"LNR,264,L-80 BTC,.038.3 bpf, D=6.276" - 8678r- 5-1/2"TBG,17#,L-80 BTC,.0232 bpf,D=4.892" 8700' 70. 8678' -17"X 5-1/2"XO,D=4.892" 4-1/2"TBG, 12.6#,13CR-80 VAM TOP, -� 8700' '+' w. 8700' -14-1/2"HALF MULESHOE,D=3.958" .0152 b f, =3.958" i,y. D P8700' --�5-1/2"X 4-112"XO,D=3.958" 4-1/2"SCAB LNR 12.6#,13CR-80 VAM TOP, 8723' +~' yy. 8712' -14-112"FSS X NP,D=3.813" .0152 bpf,D=3.958" 4-1/2"TBG CUT(07/10/03) -{ 8735' 8730' -19-5/8"X 7"UNIQUE MACHINE OVERSHOT +, 8761' H4-1/2"X 7"TBG XO,D=3.958" E: OM 8761' H9-5/8"X 5-1/2"SBR D= " 4-1/2"TBG,12.6#,L-80,.0152 bpf,D=3.958" -{ 8795' 4 • i, 8789' -19-5/8"X 4-1/2'OTIS RH PKR,D=3.93" 4.* .4.4. w~i.. �v.w. 8795' H4-1/2"X 3-1/2"XO,D=2.992" TOP OF 7"LNR 8853' `► y .} .M 8853' 9-5/8"X 7"BOT LNR PKR ID= TOP OF 2-3/8"LNR(CEMENTED) H 9326' Ih •s , 9313' -BKR 35KB LTP w/QCLUPTSA w/R NP, '�� D=1.781"(10/21/15) 9326' -2.70"BKR DEPLOY SLV,D=2.25" 9-5/8"CSG,47#,L-80 BUTT,ID=8.681" 9347' WFE2 F1-UG BUSHNG @ 9337',D=1_78" I I 3-1/2"TBG,9.2#,L-80 8RD,.0087 bpf,D=2.992" -j 9372' 1MLLOUT WINDOW(G-16B) 9374'-9379' o 3-1/2'BKR MONOBOE WHPSTOCK(01/29/15) -1 -9372' 1;1 „ r .� w/2 RA PIP TAGS @-9371' `� .. 11243' H 2-3/8"PUP JOINT w/RA TAG 7"LNR 264,L-80 BUTT,.0383 bpf,D=6.276" -{ -9372' 1§1 _ ` 11975' 2-3/8"BKR CBP (10/07/16) PERFORATION SUMMARY `.., REF LOG:BKR ATLAS RPRNGR/CCL ON 03/25/15 12210` -2-318"WED CEP ANGLE AT TOP PERE:900 @ 11275' �"'6e (02/25/16) Note:Refer to Production DB for historical pert data �/ 4k4 12464' H PBTD SIZE SPF NTERVAL OFWSOZ SHOT SOZ 1.56" 6 11275-11365 0 10/08/16 ii,or ` 1.56" 6 12040-12130 C 02/26/16 1.56" 6 12282-12462 C 03/25/15 *11 2-3/8" LNR 4.7#,L-80 TH511, H 12502' .0039 bpf,V=1.995" DATE REV BY OM/ANTS DATE REV BY COMMENTS PRUDHOE BAY INT 10/14/81 ORIGINAL COMPLETION 03/08/16 RRWIJMD SET CL3F ADFIFFS(02125-26/16) WELL: G-168 02/13/88 NIES RWO 10/12/16 MZ/JMD SET CBPYADFERFS(10/07-08/16) PERMIT No:'12150120 10/05/03 N3ES RWO API No: 50-029-20643-02 06/18/09 NORDIC1 CTD SIDETRACK(G-16A) SEC 12,T11N,R13E, 1865'FSL&2276'FWL 03/26/15 NORDIC CTD SIDETRACK(G-16B) 04/02/15 PJC CONDUCTOR DEPTH ADDED BP Exploration(Alaska) STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMMI•N REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations RI Fracture Stimulate ❑ Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate Er Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 5 C!gP h 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 215-012 3. Address: P.O.Box 196612 Anchorage, Development D Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20643-02-00 7. Property Designation(Lease Number): ADL 0028285 8. Well Name and Number: PBU G-16B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 12502 feet Plugs measured 12210 feet RECEIVED true vertical 9013 feet Junk measured feet Effective Depth: measured 12210 feet PackerMAR 2 9 2016 measured 8571 feet true vertical 9022 feet Packer true vertical 7713.93 feet r AOGCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"Conductor 39-119 39-119 Surface 2645 13-3/8"72#L-80 39-2684 39-2684 4930 2670 Intermediate 9311 9-5/8"47#L-80 36-9347 36-8423 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 12040-12130 feet 12282-12462 feet True vertical depth: 9019-9022 feet feet 9019-9015 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 34-8714 34-7843 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): D Treatment descriptions including volumes used and final pressure: 5CANNES Ar R 2 1 2016 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 236 20914 3 340 690 Subsequent to operation: 1003 10375 67 560 294 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations Q Exploratory 0 Development p Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature L neyk- Phone +1 907 564 4424 Date 3/28/16 Form 10-404 Revised 5/2015 d"7' `t L 8 ti, RBDMS 1, MAR 31 2016 /'v � Submit Original Only ,!'y/ice • . ooOo00o ca N. CON- COo7 °° o — cO � vNLO � � I) C N Cf) CO U N o o O o 0 0 0 0 i MN- V c7 •:1' O CO O) CO N N NCN O) co V Lc) co co co 00 N N I- V .- d' CO V CO CO CO O 00 N CO CO O) H f- Cn W CO O) O) CO O N CO O M co ch O O 0o O) CO N I- N- 00 C r- N Cfl � '4' N 0) O � 0) 00 V O) (.O CO O ti CO L N O) CO 00 CO O) C\ICO v a y W Q CO N CO co CO r O) O) (. O O) LO N1:3 CO CO CO O CO f— co co co = r^ (NI 00 co co O) M=V W O I— L O O 00 O C2 , co co � O CO U QI U J J co J co J O ti N N *k CO 'N O " U 00 CO - CO _ N N - N O Ci C0 N N a- O Cn V N c- O CO CO ,,, N.- C0 C 00 (0 CO (0 N N (c) J N O) CO Cr) 00 W f C 0 W W cNaD < 2 (� Z w W W W w W m 0 j F. z z z z z D U Cn Z J J J J J • 0 Packers and SSV's Attachment PBU G-16B SW Name Type MD TVD Depscription G-16B PACKER 2018.79 2018.69 7" Liner Top Packer G-16B TBG PACKER 8570.77 7713.93 4-1/2" Baker S-3 Perm Packer G-16B PACKER 9313 8390.8 3.7 Baker KB Liner Top Packer • • a) a) -0 b a) O O p 0 = co D H CD N N 0 C- oM C o t, a a 2 E 0) OO c m o mea (0 N ° Q CL co N O T )( U .O CV O �' O _O — ._ Y �` O) 0 a) - 6 cc) " 0 E .EI a) c I- O O .0 'C O) C 0 0 C 0- O LO •c W -O D o E -0 5 8 0 N V o_bpo cuJ � o co pap U QLc a a) a) r- a) f m a) a) ' Q— a) ui o a) a) •. CL � � co �' C n3 cyanno oU CQc' Cl_ (Y5 o E L a L o -0 O p L L 0-L - L X * N L o co `t rn 0 2 O o a) * t 't co M `C L m 0 .2 . 't E aH2 a = Lo M • m0 u) a 0_ ID ON a) o -3. u) (� O O O CO -Ea CO RC mm m � w _m D >,u) p m Q U , 0 U ° ° p o U O L J o 0 r� o U .U) p_ o _c U 2 U 2 U a) 5 '-- L ii O D 0 N .0 con uNi 0- � •'= a) � � o a N Q p coO 2 0 -0 E co rn d ) -r C 0 0 0 0 '- m .L- 0 0 0 a ' I 0 o U O > J - E '-r O a' g i J J E J p '� a) ~ J V t, a' -c 'C L - 2 0 * L L D p L N -C Q d L N C i Q -aaa)i -6 a aa)) coo1d * aa)) a) � Co m Noo aa)) a a o d .s0 � 0 � � � 0 0 0 o t5 3: 0 �1Qin L 0 U Q- 00 0 O 1 16 J a) * V CO O M * ' C O C E L .Q L a) ' tz a) C ri 2 u) U * 0 'L_ o — to 0 0 0 J E o m 0 0 Q- L 0 0 a m 00 a o 0 0 0 N Ta§ 3 0 o o eL a QO 0 `oN Q U cnoN rnN a) N -0 0 0 O D 0 O 0_ 0 0 ° m + oN 0 b t o Cl 0 Cl tm 0 (n2 O o0- p O• O -0 gO _r) co O « _m - maOM o * m L O. 0. r:,.: a 0 : r` * . fl o c _Q • * Q r:...: i • • N C � O_ L. o- a) (q Q. u0H O m a) %- 6 6 m O °- 0- a)Q.a) ca L a] R J 32 'c^ VJ a)• 5 2 J O ✓ Y � o O o w N N 00 CO CO TREE= 4-1/16"C1W • WELLHEAD= SA NOTES: WELL ANGLE>70°@ 10050''""' MAX ACTUATOR= BAKER C CNV G-1 6B DOGLEG:346°@ 9390'*** 4-1/2"CHROME TBG*** OKB.E3_EV= 77.08' I I BE.ELEV= 41.53' 2215' —4-1/2"fiSS X r4P,ID=3.813" KOP= 3500' 20"CONDUCTOR --{ 118' / L Max Angle= 95'@ 10350' Datum WO= 9829' — ' Datum TVD= 8800,ss ID= " GAS LIFT MANDRELS 7"BKR LNR TE BACK,10=7,50" — 1993' - ST 3286. 32775 DEV5 TY VLV B VLV LATCH BK 16 05106/15 9-5/8"X 7"ZXP LTP w MGR,ID=6.276" — 2004' Ae l NI ,4 2 7179 6503 35 KBG-2 SO BK 20 05/06/15 1 8467 7620 25 KBG-2 DMY BK 0 10/05/03 9-5/8'DV PACKER —1 2585' 8536' —4-1/2-HES X NIR ID=3,813" 13-3/8"CSG,72#,N-80,U"12.34r — 2684' ll Minimum ID = 1.781" @ 9313' e eNg EN 8557' H7"X 4-1/2"BKR S-3 PKR,ID=3.875" BKR 35KB LTP w/QCLUPTSA w/R NIP tol 8669' —14-1/2"I II:S X NP,ID=3 813" 7"LNR,26#,L-80 BTC,.038.3 bpf, ID=6.276" —1 8678' 5-1/2"TBG,17#,L-80 EITC, .0232 bpf,D=4.892" 8700' or, -.14, 8678* —17"X 5-1/2"X0,U"4.892" ssite'e 4-1/2"113G, 12.6#,13CR-80 VAM TOP, H 8700' 8700' —4-1/2"HALF MULESHOE,ID=3.958" )..ci.: .0152 bpf,D=3.958" 8700' H5-1/2"X 4-1/2"XO,D=3.958" 4-1/2"SCAB LM 12,6#,13CR-80 VA M TOP, 8723' *.' 8712' H4-1/2"EES X NIP,U"3.813" .0152 bpf,0=3.958" I — lai 4-1/2"TBG CUT(07/10/03) H 8735' 8730' H9-5/8"X 7"UNIQUE MACHNE OVERSHOT 8761' H4-1/2"X 7"TBG XO,ID=3.958" kali OM 8761' H9-5/8"X 5-1/2"SBR,ID= " 4-1/2"1BG,12.6#,L-80,.0152 bpf,D=3.958" H 8795' 8789' —9-5/8"X 4-1/2"OTIS RH PKR,ID=3.93" 8795' H4-1/2"X 3-1/2"XO,U"2.992" TOP OF 7"LNR —1 8853' '' .:•4,t: , i''' 8853' —19-5/8"X 7"BOT LNR PKR,ID= '1 iy.,ki TOP OF 2-3/8"LNR(CEMENiTED) H 9326' '' . M 9313' —BKR 35KB LTPw/0CLUPTSA w/R NP, U"zi ;"Firo 1.781'(10/21115) ! 9326' —2.70"BKR DEPLOY SLV,D=2.25' 9-5/8"CSG,47#,L-80 BUTT,ID=8.681" — 9347' WIPER PLUG BUSHING @ 9337',V=1.78" , 10 3-1/2"TBG,9.2#,L-80 8RD,.0087 bpf,ID=2.992" —1 —9372' 1 ' MILLOUT Vv1NDOW(G-16B) 9374'-9379' I 3-1/2"BKR MONOBOE WHIPSTOCK(01/29/15) — —9372' . w/2 RA PIP TAGS @—9377' 1',',/ ,.. '''N 11243' ]H 2-3/8"PUP JOINT WI RA TAG 7"LNR,26#,L-80 BUTT,.0383 bpf,ID=6,276" —I —9372' 1** %, . ' . PERFORATION SUMMARY 12210' —2-3/8"WED CIBP REF LOG:BKR ATLAS RPIWGR/CCL ON 03/25/15 ' «, (02/25/16) ANGLE AT TOP FERE 89'@ 12040' ."\." 4.4k4cifr 12464' H FI3TD Note:Refer to Production DB for historical pert data SIZE SPF INTERVAL OPKVSQZ SHOT SQZ 1.56" 6 12040-12130 0 02/26/16 4.14Nr. .Nit. 1.56" 6 12282-12462 C 03/25/15 2-3/8" LNR,4.7#,L-80 TH511, 12502' .0039 bpf,D=1.995" DATE REV BY CONVENTS DATE REV BY COIMIENTS PRWHOE BAY MIT 10/14/81 ORIGINAL COMPLETION 04/02/15 PJC CONDUCTOR DEPTH ADDED WELL: G-16B 02/13/88 NIES RWO 05/05/15 GJB/PJC SET LTP PERMIT No: 2150120 10/05/03 N36 RWO 05/06115 GJB/PJC GLV C/0 AR No: 50-029-20643-02 06/18/09 NORDIC1 CTD SIDETRACK(G-16A) 01/26/16 JMG/JMD RESET LTP(10/21/15) SEC 12,T11N,R13E,1865'FSL&2276'WA_ 03/26/15 NORDIC CTD SIDETRACK(G-16B) 03/08/16RRW/JIVC SET CI3FIADPERFS(02/25-26/16) 04/01/15 KR/JMD FINAL ODE AFFROVAL BP Exploration(Alaska) STATE OF ALASKA . •ALASKA OIL AND GAS CONSERVATION COMM N REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:Pull/Set LTP EZI 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 215-012 3. Address: P.O.Box 196612 Anchorage, Development 0 Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20643-02-00 7. Property Designation(Lease Number): ADL 0028285 8. Well Name and Number: PBU G-16B 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 12502 feet Plugs NOVPmeasured feet 'Vl l+ 4 !1 true vertical 9013 feet Junk measured feet 2015 Effective Depth: measured 12464 feet Packer measured 8571 feet AOGCCtrue vertical 9015 feet Packer true vertical 7713.93 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"Conductor 39-119 39-119 0 0 Surface 2645 13-3/8"72#L-80 39-2684 39-2684 4930 2670 Intermediate 9311 9-5/8"47#L-80 36-9347 36-8423 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 12282-12462 feet True vertical depth: 9019-9015 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr8 34-8714 34-7843 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: SCANNED jAN `' 9 20.6 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 312 20882 8 1000 674 Subsequent to operation: 292 20786 7 750 804 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations IZI Exploratory ❑ Development Q Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil I2I Gas ❑ WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG ❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature{ ' ��'7( J Phone +1 907 564 4424 Date 11/23/15 Form 10-404 Revised 5/2015 1f VT-1.-- A (0/17/„.R13 ,/' sDMSS/�/U(;,c 0 1 2015 Submit Original Only / 72-1/.5- `( • I Q. OOoo 000 co N. cool-V (()0.° 0 C N NI- 13 CO � Ln r- U N o 0 0 0 0 0 0 0 i CO F"-- Nr CO O CO • O CO N 'Cr N C\ 'Cr Ca • CO ti N- CO f— CO Cn ct cM CO M CON N I� V �t = CO no CO CO v o CO N CO N- N- r CO O N- H •cY In O CO O O CO O N cr CO O CO CO CO O CO CO O CO N I— ti G.) O tiN CO NO v Co V O) r- CO CO CO f� M ti N 0) 00 CO CO O) . CO C.) 0 4-, co < CO N (.OMCO () 6) CO O O r- Ln N "Cr 0) I CO CO CO O CO N- 00 CO CO C 'n N CO CO CO 0) • co a C 0 O COO CO O 00 co U L5) U J J (b J M J M G1 '(3 N Z *k co --I ti O 0O OO N CV _ N U O "\' C j CV N (� In •:r N t CO O O M V COI— 00 C 00 CO CO CO N N N ' CO J N 0) CO CO CO LU C 0 — W o U W U 0 CCi2Cr Z Z W W W W W W cp Q j ' Z Z Z Z Z j U cnZJJJJJ � • • Packers and SSV's Attachment PBU G-16B SW Name Type MD TVD Depscription G-16B PACKER 2018.79 2018.69 7" Liner Top Packer G-16B TBG PACKER 8570.77 7713.93 4-1/2" Baker S-3 Perm Packer G-16B PACKER 9313 8390.8 3.7 Baker KB Liner Top Packer ! • a) H E O o� 0 > 0 2 - o �_ o O J N f c p • O U) N a) J U) O * Q d a7 O E o U) M .6 O C M M O C) N (/) D J I- D N J a) (` CO ,-(:) CD o Cr) d ,_ c a) O D ~= N .0 II ��O © O _a * a) .c g d O a) 0 a) co © Ln c=- -O Q-0 > = - a 0) O- _ ' a) 0 = C � _ a) O . a) 4– CO Qa) NLL :C.-' W J E O * 3 U a) ,_ 10 a) O N 0 _ II c Q II - a n- c0 U 1 *O 2 - ca (2 uO II ca .7 U) O c Q� c a y Q– Q c N co c a) o a) '_, a) c p 0 a) 0 U c Q o _, `o - N a) 2 * x Q H 2 cr a) .- N Y a) (a u J 0 a) N > o- U) O c O "V w co 0 CO W E N 3 W �i O O Et ' U H U) `J I I cU1 O - �it 0 Lu C co 0� * a) is .( CoN QHS° c L`onia 0 L'' CO O >- U) II a) u7) Q 2 c) a) a g o , •O LL E coIP w Q -o Q o 0 0 c m E v) 0 (, ao'� c�a ° E a) D CL 2 E W d ° Y o I) N 0LI_ o o O N OZ U I- 0- cn D ti) 0 _u) a) 0.- a . •Q N- H > LO 0 E@ o�) 0- 0 m U) = _Z O 2U) N O H -C30 N= O 0 a d r � H - v : w a) o ( _I U) u) < o = � CP- E � - _I , [E Q co CO U U O O * CCS Q H j C U) o ) co O N ( d 4.1 J J co o Q N 0 0 d J OM U) H e Q pL U) 0 O co O W Q U) (I) O a) CD � a � a) d O : N- Q-U) � H ``) w ' d ct OQ Q -0CL > w _ L0 « Er U) o5 * -0 Q i -0as * QIx HOD a CCNw L > ' �o � � Y 0000 bp Off * U) 13o 0Q LWce Y 00Q G) Q °50u) W � > � n.� Nrn0 rn W (�jio '- -o � moOU U � Z IL a- Ce ZCLZ7 QO ,- cain � O = Q Q '- in c � NZQ Lu O WHO Eos a)� Q� Oa Eg Ow .- ,- 41-,L ca 0 -col- a (nO0 D 0 U) O H p , c N E O a To J W N O .— - a_co U) W Q J Z N Q _ Y O N _ o- is 0 COa_ coZ ,- � � Y oa a�iOO � - xQZ � o `n Q� O � OH QXO ZY0Ooo Eo o a cu_ W rn0_ cC - O ET no 0LLd W � � � OMZZ .- <- -a 3 `2 O OZJ QJ c) YZ `- Ln ,_ , � ZZ : Dao W O 023 > a) (1) (-) c00 L0ODo O c0 - fp O_ ' J a3 J Y N () co p 0* O coY N N M U N '� a) O 0 Y C W N J al J CO W N N 0 U w Q_ (a CC L) C 2 0 Q' a) Q-0 CD W' c' O co LIJ W 2 W J co U) II > O * _ U) co a) M J J U) C a CO f— U) co d J a) O O JHO 603 -0 a) EF- Et-- itJJ � o E -0 .-- 1.__L) F— U) J > v) � � * W * * FI- 3 ,- * W a) W DD * U Din a) •— * W W JEtD : a) p * 0_ U) * H ,O * o M 4O * co a) co J d d. * * O O m U) * U) U) U) J 0_ * O Ca O W QLo Ln Ln Ln 1n Ln 0 0 0 0 0 0 0 >- N N N N N N c H a) a) O O v- m ,_ M 5 v- v- N NN N F= O O O co O O 0 Q IFS= 41!16"CNV • SA NOTES: WILL ANGLE>700 @ 10050'*"" MAX WELLHEAD= CNV G-1 6 B ° •ACTUATOR= BAKER C DOGLEG:34.6 9390'*`" 4-112"CHROME TBG"' OKB.EIEV= 77.08' I BF.ELEV= 41.53 / 2215' H4-1/2"FES X NP,E)=3.813" 5 KOP 3500' 20"CONDUCTOR, --{ 118' L Max Angle= 95°@ 10350' # A►-4 g Datum MD= 9829' GAS LFT MALLS Datum TVD= 8800'SS ID= 11 ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 7"BKR LNR TE BACK,D=7.50" - 1993' 3 3286 3285 5 KBG-2 DOME BK 16 05/06115 9-5/8"X 7"ZXP LTP w/HGR,D=6.276" - 2004' lb iiim i 2 7179 6503 35 KBG-2 SO BK 20 05/06115 1 8467 7620 25 KBG-2 DMY BK 0 10/05/03 9-5/8"DV PACKER -1 2585' 13-3/8"CSG,72#,N-80,D=12.347" 2684' 11 ' 8536' H4-1/2"HES X NP,ID=3.813" Minimum ID =1"7$ @ 9337' ' ': 8557' H7"X 4-1/2"BKR S-3 FKR,D=3.875" WIPER PLUG BUSHING IN DEPLOY SLV 8669' H4.1/2"IESXNIP,D=3.813" 7"LNR,26#,L-80 BTC,.038.3 bpf, 0=6.276" - 8678' Ars 5-1/2"TBG,17#,L-80 BTC,.0232 bpf,D=4.892" 8700' 867$' -�X 5-1/2"XO,D=4.892" 4-t/2"TBG,12.6#,13CR-80 VAM TOP, - 8700' y 8700' -14-1/2"HALF MULESHOE,D=3.958" 0152 bpf,D=3.958" y*w 8700' 5-1/2"X 4-1/2"XO,D=3.958" 4-1/2"SCAB LNR 12.6#,13CR-80 VAM TOP, -i 8723' * 8712' -14-1/2"HES X NP,D=3.813" .0152 bpf,D=3.958" tit 4-1/2"TBG CUT(07/10/03) H 8735' �. 4�. 8730' H9-5/8"X 7"UNIQUE MACI*E OVERSHOT , 8761' H4-1/2"X 7"TBG XO,D=3.958" •�� 0m 8761' H9-5/8"X 5-1/2'SBR,D= " 4-1/2"TBG,12.6#,L-80,.0152 bpf,D=3.958" H 8795' � rZie ;v AN 8789' -19-5/8"X 4-112"OTIS RH PKR,D=3.93" t4 TOP OF 7"LNR 8853' . 8795' -14-1/2"X 3-1/2"XO,D=2.992" ; 8853' HS-5/8"X 7"BOT LNR PKR,D= '.w• E 9319' _H3-1/2"BKR LIPID=1.63"(05/05/15) TOP OF 2-318"LNR(CEMENTED) 9326' II I I , I 9326' -2.70"BKR DEPLOY SLV,D=2.25" I WIPER PLUG BUSHING @ 9337',D=1.78" I 9-5/8"CSG,47#,L-80 BUTT,ID=8.681" 9347' 3-1/2"TBG,9.2#,L-80 8RD,.0087 bpf,D=2.992" H -9372' MELOUT WINDOW(G-16B) 9374'-9379' 3-1/2"BKR MONOBOE WHIPSTOCK(01/29/15) -9372' SY%Si 1 w/2 RA PIP TAGS @--9377' :Vt '�,, N. 7"LNR,26#,L-80 BUTT,.0383 bpf,D=6.276" - -9372' Oilk N... 11243' -12-3/8"PUP JOINT w/RA TAG PERFORATION SUMMARY r ^, REF LOG:BKR ATLAS RPR/CCL ON 03/25/15 RPM/GR/CCL ANGLE AT TOP PERF:92°@ 12282' 12464' H PBTD Nate:Refer to Production DB for historical perf data ` SIZE SPF INTERVAL OPNYSQZ SHOT SQZ 1.56" 6 12282-12462 0 03125/15 ‘44,624, 2-3/8" INR,4.7#,L-80 TH511, - 12502' 4121 .0039 bpf,D=1.995" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/14/81 ORIGINAL COMPLETION 04/02/15 PJC CONDUCTOR DEPTH ADDED WELL: G-16B 02/13/88 N1 ES RWO 05/05/15 GJB/PJC SET LTP PERMIT No:"2150120 10/05/03 N3ES RWO 05/06/15 GJB/PJC GLV GO API Na: 50-029-20643-02 06118/09 NORDICI CTD SIDETRACK(G 16A) - SEC 12,T11 N,R13E,1865'FSL&2276'FWL 03/26/15 NORDIC CTD SIDETRACK(G-16B) 04/01/15 KR/JIM FINAL ODEAPFf2OVAL BP Exploration(Alaska) • STATE OF ALASKA .SKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1 Operations Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubin❑ Operations shutdown ❑ Performed Suspend ❑ Perforate Other Stimulate ❑ Alter Casing I 1 Change Approved Program ❑ Plug for Redrill n>erforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other _Set LTP n 2 Operator 4 Well Class Before Work 5 Permit to Drill Number Name BP Exploration(Alaska),Inc Development Q Exploratory ❑ 215-012-0 3 Address P O.Box 196612 Stratigraphic ❑ Service ❑ 6.API Number Anchorage,AK 99519-6612 50-029-20643-02-00 7 Property Designation(Lease Number) 8.Well Name and Number ADL0028285 PBU G-16B 9 Logs(List logs and submit electronic and pnnted data per 20AAC25 071) 10 Field/Pool(s) PRUDHOE BAY, PRUDHOE OIL 11 Present Well Condition Summary RECEIVED Total Depth measured 12502 feet Plugs measured None fee 1� true vertical 9013 feet Junk measured None feet J[f N 0 3 2 015 Effective Depth measured 12464 feet Packer measured See Attachment feet ���� true vertical 9014 53 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"x 30" 38-118 38-118 0 0 Surface 2646 46 13-3/8"72#L-80 37 5-2683 96 37 5-2683 84 4930 2670 Intermediate None None None None None None Production 9311 67 9-5/8"47#L-80 35 55-9347 22 35 55-8422 69 6870 4760 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 12282-12462 feet `I( F True Vertical depth 9018.95-9014 61 feet ��A`1IA VE J U L (� R 1 I Tubing(size,grade,measured and true vertical depth) 4-1/2"12 6#13Cr80 30 26-8710.88 30 26-7840 48 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12 Stimulation or cement squeeze summary Intervals treated(measured) Treatment descnptions including volumes used and final pressure 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 0 0 0 0 0 Subsequent to operation 1163 28533 20 0 257 14 Attachments(required per 20 MC 25 070 25 071,8 25 283) 15 Well Class after work. Daily Report of Well Operations ❑ Exploratory❑ Development Q Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16 Well Status after work Oil U Gas U WDSPL U Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17 I hereby certify that the foregoing is true and correct to the best of my knowledge Sundry Number or N/A if C 0 Exempt. N/A Contact Nita Summerhays Email Nita.Sumerhayst bp.com Pnnted Name Nita Summerh-} / _ Title Data Manager / / Signa / A+•/,2.._ / / Phone 564-4035 Date 6/3/2015 s�L� i V11— 6/i 9/�j RBDMS JUN - 5 2015 Xe- 7/s7 Form 10-404 Revised 10/2012 Submit Original Only Daily Report of Well Operations ADL0028285 4711,714170 , .„ ,, , -,/, ,, -:44,11,2,1. 7''. ,.v; , '" , T/I/O = TWC/0/0. Removed CTD test spool#05 Installed tree cap. Torqued all tree flanges to API specs. PT'd tree to API specs. (PASSED). Pulled TWC#293 @130" Through tree. Installed tree cap and PT'd to API specs. (PASSED). 4/27/2015 RDMO. ***Job Complete*** Final WHP's 450/0/0. ****WELL S/I UPON ARRIVAL**** (Post CTD) R/U SLICKLINE UNIT SWCP#4517 TO SET LTP 5/4/2015 ****CONT. JOB ON 5/5/15**** ****CONT. JOB FROM 5/4/15****(Post CTD) DRIFTED W/35 KB DMY PACKER &STINGER ASSEMBLY TO TOL @ 9,299' SLM (TT pins sheared) SET BKR 2.70" LTP STINGER SEAL ASSY. W/SNAP LATCH RECEPTACLE @ 9,299' SLM SET BKR 35 KB PACKER W/SNAP LATCH INTO SEAL ASSY. @ 9,298' SLM (TOP @ 9,319' MD) SET 3-1/2" LTTP @ 9,287' SLM - LRS PERFORMED PASSING TBG PT TO 2400 psi (see Irs log) PULLED STA#2 BK-DGLV FROM 7,160' SLM /7,179' MD &STA#3 BK-DGLV FROM 3,270' SLM/3,286' MD SET STA#3 BK-LGLV @ 3,286' MD 5/5/2015 ****CONT. JOB ON 5/6/15**** T/I/O - 700/15/0 Assist Slickline set LTP. LTP Passed pressure test at 2400 psi. Pumped 23 bbls of crude to insure tubing is fluid packed . Pump 7 bbls of crude to pre test plug set to 1500 psi. Pumped 4 bbls of crude to reach test pressure. See pressure test results in log. Bled Back 8 bbls to Final WHP - 5/5/2015 1000/20/0 SL on well at departure. ****CONT. JOB FROM 5/4/15**** (Post CTD) SET STA#2 BK-OGLV @ 7,179' MD PULLED 3-1/2" LTTP FROM 9,287' SLM 5/6/2015 ****WELL LEFT S/I & PAD-OP NOTIFIED OF STATUS UPON DEPARTURE**** FLUIDS PUMPED BBLS I DIESEL 34 CRUDE 35 TOTAL y N OO a O co (g)- O cc I\ O O „in Oa O 1 10 (O I- N 0 N O c, O O O O o o O i O co co O M co 7 N CO N r` O) m f-- O r` r` 00 0o V' co O) N N co V 'Cr O) CO CO co CO 07 CO (O 00 CO 'Cr `Zr CO • L N O O N- (O to M 4 • V O N co to — V co O V O V CO CO CO O) V co r co e0 a0 I-- N r` CO N ti N- CI I II i i i i t i I i H O) N N CO — M CO O to C)) O) co I-- ao a0 M N (O • N co co O (C) d7 CO to M O O) V co O) co co 00 O N- co N- co N N- N-co N- N f— 00 O O LO N V O 1— MM CO r-- co co LO 07 6) CO CO CO CO O) N CO CO CI i i i i i i i Q NM O CO CO O O LO CO LO N CO O) N- O CO O) 00 to C) N CO CO CO 00 0) CO Cr) a0 00 00 00 CO CO CO C p O U • L Q O O O O 00 co O Q w (0 (00000OD EU _ 00 J co co J J N co = y M J 4t *k *k *k N N X *k N- (O (O C • Ch CO •N f/) - (fl co -N nj O) (n N C r �'') � � ; N M Y N N O M com V �t V t +' M N LO CO N- O) _ LC) •cr CO C CO M (0 N CO O ~ (fl CO 0) to co O) (fl N CO J Z En 0 0If2CEw C H W W W W W N 0 U Z Z Z Z Z W U m D J J J J J Q Q UDCCD1p00mm00u QQZ Z W W O Q Q Q Q < a ( 0] OZZ100000DooD U J J 0_ (/) U) W C/) (/) Cn H H Packers and SSV's Attachment ADL0028285 SW Name Type MD TVD Depscription G-16B PACKER 2004.62 2004.52 9-5/8" Baker ZXP Packer G-16B PACKER 8556.6 7701.13 4-1/2" Baker S-3 Perm Packer TREE 4-1/16'CM/ ._ 0 WELLHEAD= CM/ G -16E3 SAFETY NOTES: WELL ANGLE>70°@ 10050'- MAX ACTUATOR= BAKEC 1 DOGLEG:34.6°( 9390'- 4-1/2"CHROME TBG- R 0103.ELEV= 77.08' I I BF.a.EV= 41,53' 2215' -14-1/2-1-ES X NP,D=3.813" KOP= 3500' 20"CONDUCTOR, --I 11&;---,/ d, Max Angle= 95°©10350' #, 0 i Datum MD= 9829' ' ID- " Datum TVD= 8800'SS . !ST MD TVD CEVGA5 TYPE V LV LATCH FORT DATE5 7"BKR LNR TE BACK,ID=7.50' H 1993' /4 9-5/8"X 7"ZXP LTPw/HGR,ID=6.276" H 2004' MID 2 7179 6503 35 KBG-2 SO BK 20 05/06/15 1 1 8467 7620 25 KBG-2 DMY BK 0 10/05/03 9-5/8'DV PAaciER I- 2585' 8"CSG,7Zet,r4-8o,ID=12.347" -1 2684' 111 8536' -4-1/2"FES X 1113,D=3.813 13-3/ - Minimum ID = 1.78" @ 9337' 0 cl 855T I-7"X 4-1/2-BKR S-3 PKR,D=3.875" O a WIPER PLUG BUSHING IN DEPLOY SLV 01• IC ! 8669' --4-1/7'HES X MP,D=3.813' D 7'LNR,26#,L-80 BTC,.038.3 bpf, =6.276' - 8678' 5-1/2-TBG, 17#,L-80 BTC,.0232 bpf,D=4.892" - 8700' 74\ 4-1/2"TBG, 12.6#,13CR-80 VAM TOP, -I 8700' sr NI 8790• I-I4-1/2"HALF MULESHOE,D=3.958' .,_,4 .0152 bpf,D=3.958' io1/4-. 8700' -15-1/2"X 4-1/2"X0, 3=3.958' 4-1/2"SCAB LM 12.6#,13CR-80 VAM TOP, - 8723' 04 8712' H4-1/2"FIES X NP,ID=3.813' .0152 bpf,ID=3.958' 12k A 4-1/2"TBG CUT(07/10/03) -I 8735' r ' 8730• 9-5/8"X 7"UNIQUE MACI-INE OVERSHOT AI Ng 8761' -14-1/2"X 7''TE3G XO,ID=3.958" 0331 ICA 8761' -9-5/8"X 5-1/2"SBR,D= ' 4-1/2"TBG,12.6#,L-80,.0152 bpf,0=3.958' -4 8795' * ;fr' . A .... . k' ' 8789' --I9-5/8"X 4-1/T OTIS RH FKR,D=3.93" •4. k ' 4 ' '.' -' * 8795' H4-1/2"X 3-1/2'XO,ID=2.992" TOP OF r LNR 8863' , ..47. k.* A i. ''''IN 8853• H 9-5/8'X 7"BOT LNR PKR,D= • I:::* **:I TOP OF 2-3/8"LNR(CEMENTE)) - 9326' 1 • 4 • •iNog 9319. H3-1/2"BKR LTP,D=1.63"(05/05/15) I I: 9326 -2.70'BKR DEPLOY SLV,D=2.25' I VVFER PLUG BUSHING©9337',0=1.78' I 11 9-5/8'CSG,47#,L-80 Burr,ID=8.681" 934T , s. is A , I 1 I 1 ' 3-1/2"TBG,9.2#,L-80 8RD,.0087 bpf,0=2.992" H -9372' e= MLLOUT WNDOW(G-16B) 9374 -9379' 1, ; 3-1/2'BKR MONOBCE WMPSTOCK(01/29/15) - -9372' 4 ,,, ..' ,.. WI 2 RA PIP TAGS Q-9377' 1 r LNR,26#,L-80 BUTT,.0383 bpf,D=6.276' - -9377 it. -....... 11243' - 2-3/8"PUP JOINT w/RA TAG '' •4 ..41. 4..,,,k% PERFORATION SUIWARY REF N....Nit. ,....... LOG:BKR ATLAS RFMGR/CCL ON 03/25/15 ANGLE AT TOP PERF:92'©12282' 1441,... ; 12464' H PBTD 14Dte:Refer to R-ocluctio* n DB for historical perf data SIZE SPF NTERVAL OPMSQZ SHOT SQZ 1.56" 6 12282-12462 0 03125/15 2-3/8' LW,4.7#,L-80 TH511, - 12502' Nt, .0039 bpf,D=17,.995" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHCE f3AY UINFT 10/14/81 ORIGINAL COMPLETION 04/02/15 PJC CONDUCTOR DEPTH ADDED WBJ_: G-16B 02/13/88 N1 RWO 05/05/15 GJI3/PJC SET LTP PERMT No:ti150120 10/05/03 N3ES RWO 05/06/15 GJEd PJC GLV C/0 AR ME 50-029-20643-02 06/18/09 NORDIC1 CTD SIDETRACK(G-16A) SEC 12,T11N,R13E 1865'FSL&2276'FWL 03/26/15 NORDIC CTD SIDETRACK(G-1613) 04/01/15 KR/JMD FNAL ODE APPROVAL BP Exploration (Alaska) • I itv 11 Hunt, Jennifer L (DOA) From: Lastufka,Joseph N <Joseph.Lastufka@bp.com> Sent: Tuesday, May 26, 2015 2:10 PM To: Hunt,Jennifer L(DOA) Subject: PBU G-16B/ PTD # 215-012 Hi Jennifer, Please reference the following well: Well Name: PBU G-16B Permit#: 215-012 API #: 50-029-20643-02-00 Date of Test: 5/23/15 Type of Test: IPT (Initial Production Test) SCANNED l �, r Choke Size: 96 Choke Unit: Deg Production Method: Flowing Duration (Hours Tested): 6 Top Reference (Top Perf MD): 12282' Bottom Reference (Bottom Perf MD): 12462' Tubing Flowing (Pressure): 300 Casing Pressure: 1500 Total Test(Rate f/0, W, G): 375/8/4724 24-Hour Rate (0, W, G): 1501 /31 / 18895 Gravity (Oil, API): 26 GOR (Gas-Oil Ratio): 12592 This well began Production on: May 22, 2015 Method of Operations on this date: Flowing 1 RBDMO JUN - 3 2015 Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable '1 by direct inspection of the file. 1 41 ,g- Oj Well History File Identifier Organizing (done) ❑ Two-sided ❑ Rescan Needed RESCAN: OVERSIZED: NOTES: //Color Items: ❑ Map . Grayscale Items: ogs: ❑ Poor Quality Originals: ❑ Other: ❑ Other: BY: CEP Date: / „ a I S /s/ 4- Project Proofing BY: Maria Date: 62f I S /s/ MP ..) Scanning Preparation Cg-.. x 30 = (i2 0 + ! 0 = TOTAL PAGES 7O (Count does not include cover sheet) BY: Maria Date: O��-'[-is- /s/ Production Scanning Stage 1 Page Count from Scanned File: 7 1 (Count does include coy sheet) Page Count Matches Number in Scanni Prepar tion: YES NO BY: 41W Date: (p a. 3- 'S isi im .) Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: /s/ Stage 2 Additional Well Reports: YES_010 TOTAL PAGES: Digital version appended by: Meredith Michal Date: /s/ Final Page Count: Stage 1 + Stage 2: TOTAL PAGES: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: /s/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc o c I u) 2 Ce 2 oN 0 o ml o ml < co z C1 N (n N Ln • p — CO et 0 '� Q O Q o , LL O N w = O Z c I N 2 N a) 0 J I rn U g(11 \ ii5 N Q ce N Q E a m LT- 1 T CV �I @ ZI ZI 2 2 m a a a Q o c co N N ml ml 0 0fa- co Z T p 00 C70_ 0 XI F g co v LLI F- C a) a) ui 0 aim 0 D o o Z ai O rn c00o v 0 Z Z EO EO O CV CV o Q' M EU co co co Q co ?? �� �u) (I(1) U) < Q r cpl o O tI To m iiQ LLQ Q Q < � w a a a x iIiI Mo_J I I I I I0 (0JI m 0 i 0) (i) O p o C �I �I ai�I ai�I ai�I ui�I @?F ai ui ai ai NI Z 4- r 0 0 2 0 2 it g it 2 it g it g 0 WIU it w w w °) N d c)a oa c)EL N oa c)d oa a� c)p=1 o o cv oWlo, N E 'c X N 'c d' •c CC_ 'c IX 'c CC 'c CC o 'c 'E 'c 'E 'c CC () N co o) o 2 m 2 2M-q 2 2 2 ,-Nop o-1ml 2 2 2 20Y Jin 0 J _N ml2 _N ml N ml2 N ml N _N ml N ml W N ml� _N N _N N mIU A/ c0°31 f0— CO cal c0'O CO CO r- CO O c0 L X a W W - W I W _ W W N 2 W N W W W W — 0 Z0 7 c In It) l[) to In to to (n in in in 1 CLU Y j 0 O O O O O O o o O o WN N N N N N N N N N N CO 0 0 0 0 0 O m IX J f0 i7 R V R V V V V V V V a w W = _ °'' J U m o 00 Z 8 Q o a o v v o 0 d N N J 0 �° a) Om �� Z Ery coao h. :: rn (NJ o v O N N co rn rn O ss p c ap E a V M 0 E w 0 Q m Wiz° t up m c- thcoHzin m p 0o J 2 N J o W Q N U oo M co J fn m 111 o ca 0 p vi Q wa. o .iiQ a of o z E Z C? o m U o 0 c E - CO CO g Z 7 cn co co (5 co CO CO N a) CO CO CO CO N ca co (o co (o (o co D a) (o (0 a) co co c E ° 0 0 0 0 0 (CO 1) 0 0 0 0 0 rn Z a o m m m To 2 To o m m m in cm 9) 9) 2 o) o) g .cm 9 .rn .rn .rn a) oocowoccrnrnrnrnrnw aa UU•) < z t c d co E i° to co) co co (inn to to co co in co co N rere O 0 2 w 0 Z N N N N N N N (N N N N N O Q ` CO o E w V O CG ` 5— 42 0 `N 0 O 5 "o v Z W c G 2 U 0 0 0 0 0 0 0 0 0 0 0 v J y 0 =U' -- p. , rn« o. p 0 0 0 0 0 o 0 0 0 0 0 a. CC 0 I 3 30I w w w w w w w LULLILLILLI o -- -- N 0 I 0 E I ,I No 9 w DI w -p Y DI w 1 °O LT_ Li a o Z JI w JI p UI w JI a > J `' N 0 Z JI Z a) U V , CO JI Z 0 o 5 wl Q wI >. > > I Q w ct C I Z a> N N Z o co LL 0 i' 2 Z V N LL CO F F C >o DI o co v) a) T Y a 0I 0 Z Z H H o �o CO 2 U co ' 2 I-- D d �I `O .Lot- it it it u) QI `a co SAI `nl Q Q E E ce m m m m = co m 2 2 2 m m m ,— COI co n 2 2 w U J U N O N 62 U U U U U [ U O U N U N V O a) �I E a) w1 N NI-o a) a) a) a) m w a) a) a) yl a) yl 0 Z LL a) U li a) a) •d ll IL Il IL lL O LL LL w O Il N cf "N'' N 0 IYIY 0�Iv 0 DIY cv cv .0 .-1 v 0�I 0 DIY d U (I) _ 'c ceH 'c 2 a 'c CLH 'c 'c 'c 'c 'c 1 'c c 'c ct 'c CeH o Lu E {. N i0 O O V1 2 O Y 2 0 UI o O O O O N 2 2 2 O Y O 0 U1 N WD E N N col-± ID', SIU d elm N N N N 2,1 N _N 1-5,0,1,5 SIU N�Im ,_Q O 1�{� a ;12 w - I w .--1 w I w w w w w.- w w w� _I w. 1 N i 0t 0.. r= V o 0 1.0 in 0 0 5 0 0 0 0 0 0O EN E WN N N N N N N N N NNN N (a 3 _O _O O_ O_ O O O O O O O_ _O N z Zi a LU UJ ( e. a- V 0. J Z CO a) o CL Q to CO o m = o. co CL O u) c a m O2N OD E U ZU w LO o COcu Q COo t a c7 a o ZinH m o T. N )- CV COCD Q N C CO CO CO • N a) V� I O 0 id o r 4 a) Q z Eo I' 0 a) 0 co E cco DS 0 Z V) = CO CO CO CO CO CO CO CO co CO CO CO N CD CO CO CO CO CO CO CO CO CO CO CO CO V CO 0 0 0 0 0 0 0 0 0 0 0 0 ami c rno co CO CO cocococo o m m CO I c 5) .5) 'o) o) 'o) '5) 'rn 'o) cm an on o) rn is N > 0 0 0 0 0 0 0 0 0 0 0 0 0 w w H 0) 0) 0) 0) 0) 0) O) O) O) 0) 0) 0) c > o co co co cfl c0 c0 (O 0 co aJ CO CO CO — w If) (t) LO LO cO LID LO in up in al cO co U) r N N N N N N N N NNN N N d W N I N C a) a. E E z E o N co O D Z 2 m Q U ,, U U 0 U U U U U U U U 0 0 C 2 E 0 O 0 a`) 0 O 0 0 O 0 0 0 0 0 0 0 0 p m Z II 2 w w w w w w w w w w w w J o I -n o N //�� N o CCI AQ, 00 N 0 Z >- >.- >- ti N N co 0 a) o D r >, o o E. m v> N O Q ;,�/�� F- o n o JiJ Z L s o F. U a m Q a) a) 2 V U U ro J V z .) , y ;0• r > R ce5 m N 0 O Z • `� o • w 0. w ui f135, oe ° 0. ii E X a) co W w ui a) V pap O E E 1 1 Z m co N Q w co N O Of 16 co J 0. c J °' _ D E " CL oa co 2 0 0 c 2 z; o I O N03 nI E Q.) « , M cD m o J m } E Q co o o i U Zin 8 0 , G = N 5 (0 ca7 Q N a) E CO co 0 m izi o 1- E • cu I m N CO CO • v ._ a c v/ p 0 c c O p Q 6 ce = m a a> c - n Q a ° m O Z E > O 2 to Z m • M 0 m Z N CO (S ›- p M 0 CIc O co re o I-in E n O a) O O t- 3 N a1 N c CL N x 6 m CD N W CO a' 0 Noce F co C) 0 c a> Z c co O Na) o ca o o Q O 0 c U +_ N U m J .� a) •Q' Ali N c6 0 n = o a n as V E a O 0 E o 0 E o aNi ' E E O a 2 O a U' C.)) O C p 0 0 RECEIVED STATE OF ALASKA APR 2 4 2015 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG OGCC la. Well Status: • ®Oil 0 Gas 0 SPLUG 0 Other ❑Abandoned ❑Suspended 1b. Well Class 20AAC 25105 20AAC 25110 0 Exploratory 0 Stratigraphic ❑ GINJ ❑WINJ 0 WAG 0 WDSPL ❑ Other No.of Completions One • ® Development ❑ Service 2. Operator Name: 5. Da Comp.,,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration (Alaska) Inc. •3/26/2015 . 215-012 • 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 •3/15/2015 50-029-20643-02-00 4a. Location of Well(Governmental Section): 7. Date T.D. Reached: 14. Well Name and Number: Surface: • . 3/22/2015 PBU G-16B - 3414' FNL, 3003' FEL, Sec. 12,T11N, R13E, UM Top of Productive Horizon: 8. KB(ft above MSL): 77.08' 15. Field/Pool(s) 5038' FNL, 578' FEL, Sec. 11,T11N, R13E, UM GL(ft above MSL): 40.08' Prudhoe Bay/Prudhoe Bay Total Depth: 9. Plug Back Depth(MD+TVD) 1659' FNL, 547' FWL, Sec. 13,T11N, R13E, UM 12464' • 9015' ' 4b. Location of Well(State Base Plane Coordinates, NAD 10.Total Depth(MD+TVD) 16. Property Designation. Surface: x- 657241 - y- 5968213 - Zone- ASP4 .12502' - 9013' . ADL 028280&028285• TPI: x- 654423 y- 5966531 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 655588 y- 5964654 Zone- ASP4 None 18 Directional SurveY: ®Yes ❑ No 19.Water depth, if offshore: 20. Thickness of Permafrost(TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 2098' (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD/GR/RES, GR/CCL/RPM -9374' • 8448' - 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT. PER FT. GRADE - TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20"x 30" Insulated Conductor 38' 118' 38' 118' 36" 8 cu yds Concrete 13-3/8" 72# L-80 37' 2684' 37' 2684' 17-1/2" 3621 cu ft Permafrost II 9-5/8" 47# L-80 36' 9347' 36' 8422' 12-1/4" 1277 cu ft Class'G', 130 cu ft PF'C' 7" _ 26# L-80 8853' 9374' 7969' 8448' 8-1/2" 372 cu ft Class'G' 7"x5-1/2"x4-1/2"x3-1/2" 26#/17#/12.6#/9.2# L-80/13Cr80/L-80 1993' 9374' 1993' 8448' Scab Liner 1207 cu ft Class'G' 2-3/8" 4.7# L-80 9326' 12502' 8403' 9013' 3-1/4" 87 sx Class'G' 24. Open to production or injection? ®Yes D No 25. TUBING RECORD If Yes, lttost each interval open SIZE DEPTH SET(MD) . PACKER SET(MD/TVD) (MD+TVD of Top&Bottom; Perforation Size and Number): 1.56"Gun Diameter 4-1/2", 12.6#, 13Cr80 8700' 8557'/7701' 26. ACID, FRACTURE,CEMENT SQUEEZE, ETC. 12282'-12462' 9019'-9015' WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ® No 1 }{ v DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 2600' Freeze Protect w/40 Bbls Diesel 27. PRODUCTION TEST Date First Production Method of Operation(Flowing, Gas Lift,etc Not on Production _ N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period • Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ® No , Sidewall Core(s)Acquired? 0 Yes ® No If Yes to either question, list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions,core chips, photographs and laboratory analytical results per 20 AAC 250.071. None Form 10-407 Revised 10/2012 y- L CONTINUED ON REVERSE RBDMS Submit Original Only. �A �//a//.� 'Z'/6 APR t 9 201,E C' (2-/1 29 GEOLOGIC MARKERS(List all formations and m--'ers encounter 30. FORMATION TESTS NAME TVD Well Tested? es ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Shublik 9406' 8779' None Sadlerochit-Zone 4 9484' 8555' CGL-Zone 3 9652' 8715' Base of CGL-Zone 2C 9735' 8795' 23SB-Zone 2B 9789' 8843' 22TS 9871' 8910' 21TS-Zone 2A 9938' 8956' Zone 1B 10037' 9006' Formation at Total Depth: Zone 1B 10037' • 9006' 31.List of Attachment: Summary of Daily Drilling Reports,Well Schematic Diagram, Surveys, Cement Report 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact' J Kyle Raese,564-4629 Email: John.Raese@bp.com Printed Name: p Title' Drilling Technologist Joe Lastufka 1 Signature: Phone 564-4091 Date: 410415 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la' Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex 50-029-20123-00-00) Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift, Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only TREE= 4-1/16"CNV —_ --I 6B SAFET TES: WEIL ACTUATOR= BAKER C DOGLBI,...4.60 @ 9390' A MAX 4-1/2"CHROME TBG*'* OKB.ELEV= 77.08' BF.ELEV= 41.53' KOP= 3500' / 2215' H4-1/2"HES X NP,D=3.813" ? Max Angle= 95°@ 10350' # T ,` I Datum MD= 9829' — Datum TVD= 8800'SS ID= GAS UFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 7"BKR LNR TE BACK,D=7.50" — 1993' 3 3286 3285 5 KBG-2 DMY BK 0 05/26/11 on . - 9-5/8"X 7"ZXP LW w/HGR,D=6.276" 2004' 2 7179 6503 35 KBG-2 DMY BK 0 05/26/11 1/4 1 8467 7620 25 KBG-2 DMY BK 0 10/05/03 9-5/8•DV PACKER — 2585' 8536' ,H4-1/2"1-E5 X NP,D=3.813" 13-3/8'CSG,72#,N-80,D=12.347' --i 2684' I :t— Minimum ID =1.78" @ 9337' icio 8557' —7'X 4-112"BKR S-3 PKR D=3.875" WIPER PLUG BUSHING IN DEPLOY SLV 8669' H4-1/2"HESX MP,D=3.813" 7'LNR,26#,L-80 BTC,.038.3 bpf, D=6.276" —{ 8678' il 5-1/2"TBG,174,L-80 BTC,.0232 bpf,13=4.892" 8700' r y 8678' —r7'X 5-1/2"XO,D=4.892' 4-112'TBG,12.6#,13CR 80 VAM TOP, 8700' +'t ! 8700' —14-1/2'HALF MULESHOE,D=3.958" .0152 bpf,D=3.958" ► .*? 8700' --15-1/2'X 4-1/2"XO,D=3.958" ..1 0, 4-1/2"SCAB LNR 12.6#,13CR-80 VAM TOP, H 8723' 0152 bpf,D=3.958' . 8712' —I4-1/2"HES X NP,D=3.813" SRI 4-1/2'TBG CUT(07/10/03) 8735' II:Yr it. 1 8730' H 9-5/8'X 7'UNIQUE MACHINE OVERSHOT 4,® he a 8761' —14-1/2'X 7'TBG XO,D=3.958" 131 ��� 8761' —i 95/8"X 5-1/2'SBR D= 4-1/2"TBG,12.64,L-80,.0152 bpf,D=3.958' --I 8795' 8789' H9-5/8"X 4-1/2.OTIS RH PKR,D=3.93" — TOP OF 7'LNRj 8853' 111D 8795' —14-1/2"X 3-1/2"XO,D=2.992" 8853' —19-5/8"X 7"BOT LNR PKR, =_' TOP OF 2-3/8"LNR(CEMENTED) 9326' ' I 9326'i 2.70'BKR DEPLOY SLV,D=2.25" �VVPER PLUG BUSHING @ 9337',D=1.78" 9-5/8"CSG,474,L-80 BUTT,D=8.681" 9347' I 1 3-1/2'TBG,9.2#,L-80 8RD,.0087 bpf,D=2.992" — --9372' I MLLOUT WINDOW(G-16B) 9374'-9379' 3-1/2"BKR MONOBOE WI-IPSTOCK(01/29/15) —9372' w/2 RA PIP TAGS @—9377' `• 7"LNR,26#,L-80 BUTT,.0383 bpf,D=6.276" —{ —9372' • 11243' —{2-3/8'PUP JOT w/RA TAG JOINT PERFORATION SUMMARY REF LOG:BKR ATLAS RPMGR/CCL ON 03/25/15 �. ANGLE AT TOP PERF:92"@ 12282' •. ` 12464' —I PBTD Note:Refer to Production DB for historical perf data . SIZE SPF _ INTERVAL OPPYS07 SHOT SQZ 1.56" 6 12282- 12462 0 03/25/15 -•-A 2-3/8" LNR,4.7#,L-80 TH511, H 12502' .0039 bpf,D=1.995' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 10/14/81 ORIGINAL COMPLETION 04/01/15 KR/JMD FINAL ODEAPFROVAL WELL: G-16B 02/13/88 N1 ES RWO PERMT No:'`2150120 10/05/03 N3ES RWO API ND: 50-029-20643-02 06/18/09 NORDIC1 CTD SIDETRACK(G-16A) SEC 12,T11N,R13E, 1865'FSL&2276'FWL 03/26/15 NORDIC CTD SIDETRACK(G-16B) 03/31/15 JMD DRLG HO CORRECTIONS BP Exploration(Alaska) North America-ALASKA-BP Page 1 of 17 Operation Summary Report Common Well Name:G-16 i AFE No Event Type:RE-ENTER-ONSHORE(RON) I Start Date:3/11/2015 End Date:3/23/2015 X3 016MH-C:(4,253,243.53) Project:Prudhoe Bay ' Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM Rig Release:3/26/2015 Rig Contractor.NORDIC CALISTA 1 UWI:500292064300 Active datum:ORKB @77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/11/2015 13:00 - 14:30 1.50 MOB N RREP PRE i CONDUCT FUNCTION CHECK OF MOVING ;SYSTEM WHILE WARMING UP. FOUND ONE DRIVE MOTOR HAS ISSUES. REPLACEMENT • MOTOR ON SITE,CHANGE OUT DRIVE MOTOR PER PLANNED MAINTENANCE. FUNCTION TEST,ALL GOOD. 14:30 - 16:00 1.50 MOB P PRE INSPECT AROUND RIG IN PREPARATION FOR RIG MOVE,CLEAN LAST AREA OF PACKED SNOW TO OPEN CELLAR DOORS. PJSM ON ' PULLING OFF OF WELL. MOVE OFF OF D-18 WITH NO ISSUES. ,16:00 - 22:00 6.00 MOB N WAIT PRE STAGE RIG TO SIDE OF D-PAD. CONDUCT ROUTE DRIVE TO END OF PAD ENTRANCE. MOVE MAT BOARDS,CLEAN UP AROUND ' WELL D-18 WHILE WAITING ON SECURITY. 22:00 - 00:00 2.00 MOB P PRE MOVE RIG FROM D PAD&HEAD TO G PAD. r-- 3/12/2015 00:00 04:00 4.00 MOB P PRE CONTINUE TO MOVE RIG FROM D PAD.SET RIG DOWN AT PAD ENTRANCE. 04:00 - 06:00 2.00 MOB N WAIT PRE WAIT ON WEATHER. 06:00 - 08:30 2.50 MOB -N WAIT PRE CONDUCT CREW CHANGE OUT AND WALKAROUNDS. CONTINUE TO WAIT ON WEATHER;TEMP-39 AMBIENT,TRUCKING SUPPORT NOT ALLOWED TO MOVE YET. 08:30 - 13:15 4.75 MOB N WAIT PRE TRUCKING SUPPORT AT D-PAD,MOVING PARTS TRAILER TO LOCATION. CREW OVER TO D-PAD TO RETRIEVE CRIBBING FOR PLACING RIG ON. ' I 13:15 - 18:30 5.25 MOB P " PRE WEATHER NOT BREAKING. DE-RATE LOADER EQUIPMENT PER BP POLICY IN AGREEMENT WITH NORDIC SUPERVISOR AND SAFETY REP. COMPLETE HACL AND CONDUCT SAFETY MEETING ON MOVING MAT BOARDS. MOVE MAT BOARDS INTO POSITION ON WELL FOR SETTING RIG DOWN.BACK OVER WELL.ACCEPT RIG AT 16:00. 18:30 - 19:00 0.50 MOB P PRE PJSM REGARDING LEAK TITE TEST&ND TREE CAP. ' 19:00 - 00:00 5.00 MOB P PRE LEAK TITE TEST TREE CAP.ND TREE CAP. i NU BOP'S.SECURE WITH 4-WAY CHAINS.RU 7-5/8"LUBRICTOR.CONCURRENTLY,HOIST REEL&DROP INTO INTO REEL HOUSE.RU 1 i INNER REEL IRON.SPOT&RU TIGER TANK& HARDLINE.TEST TIGER TANK HARDLINE TO 250PSI/4000PSI. 3/13/2015 00:00 - 01:30 1.50 BOPSUR P PRE CONTINUE TO NU BOPE.FILL STACK WITH WATER.FLUSH MGS.GET STACK MEASUREMENTS. Printed 4/6/2015 10:34:39AM North America-ALASKA-BP Page 2 of 17 Operation Summary Report Common Well Name:G-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/11/2015 End Date:3/23/2015 X3-016MH-C:(4,253,243.53) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM Rig Release:3/26/2015 Rig Contractor:NORDIC CALISTA UWI:500292064300 Active datum:ORKB©77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 05:45 4.25 BOPSUR P PRE SHELL TEST BOPE-PASS. START BOP TEST. STATE GIVEN NOTIFICATION OF BOPE TEST 03/10/2015 12:55 STATE INSPECTOR BOB NOBLE WAIVED WITNESS 03/12/2015 PRESSURE TEST ALL BOP EQUIPMENT AS PER AOGCC REGS,PTD#215012,AND CRT-AK-10-45 TEST BOPE TO 250/3500 PSI FOR 5/5 CHARTED MIN -TEST BOPE TO 250/3500 PSI FOR 5/5 CHARTED MIN TEST CHOKE VALVES,CHOKE AND KILL HCR VALVES,INSIDE MANUAL VALVES ON CHOKE AND KILL LINES,BOP RAMS AND ANNULAR PREVENTER -ALL 2"PIPE RAMS TESTED WITH 2"TEST JOINT I-2-3/8"PIPE RAMS TESTED WITH 2-3/8"TEST JOINT -ANNULAR TESTED WITH BOTH 2-3/8"AND 2" TEST JOINT '-TEST FULL OPENING SAFETY VALVE -FUNCTION BOPE FROM BOTH REMOTE PANELS PERFORM DRAW DOWN TEST OF ACCUMULATOR -ALL TESTS WITNESSED BY WSL OR TOUR PUSHER -BLIND RAMS PASSED LOW PRESSURE TEST BUT FAILED INITIAL HIGH PRESSURE TEST 05:45 06:15 0.50 BOPSUR ' N RREP PRE OPEN UP DOORS,INSPECT BLADE SEALS- IN GOOD CONDITION;SWAP OUT BLADE SEALS. INSPECT RAM BLOCKS AND THEY ARE INSTALLED CORRECTLY,REPLACE AND RETEST. GOOD LOW PRESSURE TEST AGAIN BUT FAILED HIGH PRESSURE TEST. 06:15 - 11:00 4.75 BOPSUR P PRE CONTINUE WITH BOP TESTING OF OTHER COMPONENTS WHILE INVESTIGATING FAILURE CAUSE. TEST ALL AUDIBLE AND VISUAL ALARMS, PASS -CONTINUE WITH TESTING BOP COMPONENTS,ALL TESTS GOOD 11:00 - 12:00 1.00 BOPSUR N RREP PRE RE-TEST BLIND RAMS. LOW PRESSURE TEST TO 250 PSI GOOD. CONDUCT HIGH PRESSURE TEST TO 3500 PSI,ALL GOOD. SEE TRACTION REPORT 4952165 FOR DRILLING TROUBLE TIME REPORT DUE TO RE-TEST OF BLIND RAM DURING BOP TEST. 12:00 - 14:45 2.75 BOPSUR P PRE PREP COIL FOR PRESSURE TEST,INSTALL E-LINE BOOT. STAB ON,PT QTS,PUMP METHANOL SPEAR,FILL COIL WITH WARM WATER. CIRCULATE TO ENSURE COIL IS FREE AND TO WARM IT UP. PRESSURE TEST INNER REEL IRON AND HARD IRON IN REELHOUSE. TESTS GOOD. 14:45 - 15:30 0.75 RIGU P PRE REVERSE CIRCULATE TO PUMP SLACK BACK. Printed 4/6/2015 10:34:39AM North America-ALASKA-BP Page 3 of 17 Operation Summary Report Common Well Name:G-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/11/2015 End Date:3/23/2015 X3-016MH-C:(4,253,243.53) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM Rig Release:3/26/2015 Rig Contractor:NORDIC CALISTA UWI:500292064300 Active datum:ORKB t 77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:30 - 16:45 1.25 RIGU P PRE POP OFF,INSTALL COIL CUTTER. CUT 250' OF COIL. 16:45 - 17:15 0.50 RIGU P PRE CONDUCT RIG EVACUATION DRILL HOLD AAR,DISCUSSED COMMUNICATION AND MUSTER POINTS,IDENTIFIED PERSONNEL WHO CAN GIVE COMMAND TO CONTROL RIG ESD TO SHUT IT DOWN. GIVE ALL CLEAR, PERSONNEL BACK TO RIG. - 17:15 - 21:35 4.33 RIGU P PRE PREP END OF COIL FOR RE-HEADING. RE-HEAD WITH CONNECTOR AND BAKER INTEQ TOOLS,DUAL BACK PRESSURE VALVES.PULL TEST TO 32K.PUMP SLACK FORWARD.HEAD UP BHI UQC. CONCURRENTLY,TORQUE TREE BOLTS, VERY MINOR ADJUSTMENT. 21:35 - 22:00 0.42 RIGU P PRE PRESSURE TEST UQC 250PSI/4000PSI- PASS. 22:00 - 23:30 1.50 RIGU P PRE RU TO PULL TWC.PRESSURE TEST 250PSI/4000PSI-PASS.PULL TWC.2472PS1 BELOW TWC.LD DSM LUBRICATOR. 23:30 - 00:00 0.50 RIGU N SFAL PRE TEST FLOATS-FAILED THREE TIMES,FAST BLEED OFF.BREAK OFF UQC.REMOVE CHECKS-PACKED WITH CEMENT CHUNKS. 3/14/2015 00:00 - 02:30 2.50 RIGU N SFAL PRE PUMP 1%8.6PPG KCL THRU COIL AT 1.5BPM/1000PSI TO REMOVE ANY REMAINING CEMENT CHUNKS FROM COIL.INSTALL FLOATS.TORQUE UP UQC.TEST FLOATS 250PSI/3500PSI-PASS. _ 02:30 - 02:40 0.17 RIGU P - PRE PJSM REGARDING KILL WELL. 02:40 - 04:37 1.95 RIGU P PRE KILL WELL WITH 5BBLS OF METHANOL FOLLOWED BY 220BBLS OF 1%KCL.STOP AT 22OBBLS&FLOW CHECK PER OCN-OK. PUMP REMAINING 70BBLS OF KCL FOLLOWED BYATUBING VOLUME OF i 138BBLS OF 9.5PPG POWER PRO MUD. INITIAL WHP 2400PSI.USE PUMP#1 DOWN KILL LINE AT 3.3BPM&PUMP#2 DOWN COIL AT 2.25BPM.BLEED DOWN IA&OA TO SLOP TRAILER FROM 500PSI TO OPSI-LIQUID. 04:37 - 05:20 0.72 RIGU NHMAN PRE .FLOW CHECK-FAIL.SHUT IN WELL- OPSI. MAKE NOTIFICATIONS.RIH 150'TO PREVENT COIL FREEZE UP,-7PSI.AGREE TO VERIFY WHP.VAC.FILL HOLE,0.5BPM IN&0.4BPM OUT.ISSUE SOLVED-THE VAC TRUCK WITH 10PSI LINED UP ON PUMP#1 FED THRU THE PUMP INTO THE WELL VIA THE KILL LINE- GOOD RESPONSE&PROBLEM SOLVING BY CREW. 05:20 - 06:30 1.17 RIGU P PRE ;FLOW CHECK-PASS.0.7BBLS TO FILL. 0.68BPM IN/0.56BPM OUT.POH.FLOW CHECK -PASS.CIRC TO KEEP HOLE FULL WHILE CHANGE OUT WITH DAY CREW. 06:30 - 07:15 0.75 STMILL P WEXIT 1 MU MILLING BHA PER PROGRAM WITH 1 WEATHERFORD 1.25°FIXED BEND MOTOR AND 2.80"MILL. MILL 2.80"NO-GO. STRING MILL GO AT 2.80",NO-GO AT 2.79". STAB ON, I PRESSURE TEST QTS. LOSSES WHILE AT SURFACE AVERAGING 6 BPH. Printed 4/6/2015 10.34.39AM North America-ALASKA-BP Page 4 of 17 Operation Summary Report Common Well Name:G-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/11/2015 End Date:3/23/2015 X3-016MH-C:(4,253,243.53) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 , Spud Date/Time:9/24/1981 12:00:00AM Rig Release:3/26/2015 Rig Contractor.NORDIC CALISTA UVN:500292064300 Active datum:ORKB @77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT I NPT Depth Phase Description of Operations (hr) (usft) 07:15 - 09:30 2.25 STMILL P WEXIT RIH WITH MILLING ASSEMBLY. NO ISSUES WHILE RIH. LOSS RATE OF-7 BPH INITIAL SLOWED TO 0 BPH AT 4000'MD WHILE RIH. 09:30 - 10:30 1.00 STMILL P WEXIT LOG TIE-IN FOR DEPTH CONTROL WITH-2' CORRECTION. PICK BACK UP AND LOG CCL 'FOR LINER TOP PLACEMENT LATER IN WELL. 10:30 - 13:00 2.50 STMILL P WEXIT MOVE DOWN TO TAG WHIPSTOCK TAG WHIPSTOCK AT 9373'. PICKUP,RECORD SLOW PUMP RATES AND PARAMETERS;SOW 16.2K,PUW 31K. MOVE DOWN AND ENGAGE WHIPSTOCK AT 1.73 BPM,3360 PSI FREE SPIN. -ENGAGE WHIPSTOCK AT 9373'. ATTEMPT TO MILL,ORIENTATION JUMPED TO 0°WITH LESS THAN 120 LBS WOB. PICK UP, ATTEMPT TO ENGAGE AGAIN,ORIENT MILL AROUND AND RE-SET AT 180°. -ENGAGE TRAY,INCREASE WOB UP TO 400 LBS,ALLOW TO DROP OFF AND ORIENTATION WHIPPED AROUND AGAIN WITH 160 LBS WOB. DROP FLOW RATE TO 1.5 BPM,STILL HAVING ERRATIC READINGS. -PICK UP TO MIDPOINT OF JOINT TO ENSURE HOT IS BETWEEN COLLARS,STILL GETTING ERRATIC READINGS. DD AND WSL AGREE THAT THIS IS NOT GOING AS PLANNED,DISCUSS WITH BP SUPERINTENDENT. DECIDE TO POH FOR BHA INSPECTION. -MW IN 9.5 PPG,MW OUT 9.45 PPG. LOSSES AVERAGING 6-7 BPH WHILE ON BOTTOM CONDUCTING PUMPING OPERATIONS 13:00 - 14:30 1.50 STMILL N •DPRB 9,373.00 WEXIT FLOW CHECK,NO FLOW.POH WITH BHA. FLOW CHECK AT SURFACE,ALL GOOD. LOSSES OVER FULL TRIP WERE 6 BBLS. 14:30 - 16:00 1.50 STMILL N DPRB 9,373.00 WEXIT TAG UP,POP OFF AND BREAK OFF FROM i BHA. STAND INJECTOR BACK STAND BACK 1 UPPER PORTION OF BHA,BREAK OFF MOTOR FROM LOWER PORTION. RE-SCRIBE MOTOR TO HIGH SIDE FOR DIRECTIONAL CONTROL. WINDOW MILL GAUGE 2.80"NO-GO. -MAKE UP NEW BHA WITH CHANGE OUT OF LOWER PORTION TO INCLUDE GAMMA AND ORIENTING SUBS. STAB ON,PRESSURE TEST QTS. -NO LOSSES WHILE AT SURFACE 16:00 - 17:35 1.58 STMILL N DPRB 9,373.00 WEXIT RIH WITH BHA. 17:35 - 18:00 0.42 STMILL N DPRB 9,373.00 WEXIT LOG DOWN FOR TIE-IN FROM 9170',MINUS 2' CORRECTION. 18:00 - 19:00 1.00 STMILL N DPRB 9,373.00 WEXIT CONTINUE TO RIH.GET SPR'S.DRY TAG AT 9372.72'.BLEED DOWN IA&OA TO SLOP TRAILER FROM 500PSI TO OPSI-LIQUID. Printed 4/6/2015 10:34:39AM North America-ALASKA-BP Page 5 of 17 Operation Summary Report Common Well Name:G-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/11/2015 End Date:3/23/2015 X3-016MH-C:(4,253,243.53) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:OOAM Rig Release:3/26/2015 Rig Contractor:NORDIC CALISTA UWI:500292064300 Active datum:ORKB©77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) x19:00 - 00:00 I 5.00 STMILL P WEXIT MILL DUAL STRING WINDOW FROM 9372.00' • USING 9.5PPG POWER PRO -PUMPS AT 1.78 BPM,FREESPIN AT 3400 PSI -MW IN/OUT 9.55/9.48 PPG -MM IN/OUT 1.78/1.78 BPM -START OFF TRYING TO GET 300 PSI MOTORWORK&MAINTAIN 1'/HR PER WELL PLAN. 19:30 PARAMETERS,9372.5' PUMPS MM IN/OUT 1.78/1.76 BPM,WOB 0.96K, MOTOR WORK 223 PSI,ECD 10.26 PPG 20:00 PARAMETERS,9372.9' PUMPS MM IN/OUT 1.78/1.76 BPM,WOB 1.96K, MOTOR WORK 284 PSI,ECD 10.26 PPG 20:30 PARAMETERS.9373.4' STALL AT 9373.4'WITH-2.8KWOB.PUH& START OVER.PUMPS MM IN/OUT 1.73/1.71 BPM,WOB 1.23K,MOTOR WORK 100 PSI,ECD 10.25 P PG 21:00 PARAMETERS,9373.6' PUMPS MM IN/OUT 1.72/1.70 BPM,WOB 1.6K, MOTOR WORK 253 PSI,ECD 10.26 PPG 21:30 PARAMETERS,9374.2' PUMPS MM IN/OUT 1.72/1.70 BPM,WOB 1.43K, MOTOR WORK 253 PSI,ECD 10.26 PPG 22:00 PARAMETERS,9374.2' PUMPS MM IN/OUT 1.72/1.70 BPM,WOB 1.43K, MOTOR WORK 253 PSI,ECD 10.26 PPG 22:30 PARAMETERS,9375.0' PUMPS MM IN/OUT 1.72/1.71 BPM,WOB 1.77K, MOTOR WORK 239 PSI,ECD 10.26 PPG 23:00 PARAMETERS,937.5' PUMPS MM IN/OUT 1.72/1.70 BPM,WOB 1.98K, MOTOR WORK 245 PSI,ECD 10.25 PPG 23:30 PARAMETERS,9375.8' PUMPS MM IN/OUT 1.72/1.70 BPM,WOB 2.21K, MOTOR WORK 242 PSI,ECD 10.25 PPG 24:00 PARAMETERS,9374.2' PUMPS MM IN/OUT 1.72/1.70 BPM,WOB 1.43K, MOTOR WORK 253 PSI,ECD 10.26 PPG Printed 4/6/2015 10:34:39AM North America-ALASKA-BP Page 6 of 17 Operation Summary Report Common Well Name:G-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/11/2015 End Date:3/23/2015 X3-016MH-C:(4,253,243.53) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM Rig Release:3/26/2015 Rig Contractor:NORDIC CALISTA UW:500292064300 Active datum:ORKB©77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/15/2015 00:00 - 04:35 4.58 STMILL P WEXIT CONTINUE TO MILL DUAL STRING EXIT FROM 9374.2'AT 1'/HR OR 300PSI MW USING 9.5PPG POWER PRO. 00:00 PARAMETERS,9374.2' PUMPS MM IN/OUT 1.72/1.70 BPM,WOB 1.43K, MOTOR WORK 253 PSI,ECD 10.26 PPG 00:30 PARAMETERS,9376.6' PUMPS MM IN/OUT 1.72/1.71 BPM,WOB 3.6K, MOTOR WORK 253 PSI,ECD 10.26 PPG 01:00 PARAMETERS,9376.6'SLOW DOWN TO .5'/HR&LET MILL OFF DUE TO 375+PSI MW. PUMPS MM IN/OUT 1.72/1.71 BPM,WOB 3.2K, MOTOR WORK 375 PSI,ECD 10.25 PPG 01:30 PARAMETERS,9377.0'BLEED DOWN IA &OA TO SLOP TRAILER FROM 500PSI TO OPSI-LIQUID. PUMPS MM IN/OUT 1.72/1.71 BPM,WOB 3.7K, MOTOR WORK 362 PSI,ECD 10.25 PPG 02:00 PARAMETERS,9377.4' PUMPS MM IN/OUT 1.73/1.71 BPM,WOB 4.1K, MOTOR WORK 378 PSI,ECD 10.25 PPG.MAX WOB-4.69K FOR 10 MIN. '02:15 PARAMETERS,9377.6'LOSING WOB- MILLING BREAK(PLANNED)DONE MILLING •3-1/2"&NOW LEAD MILL IS MILLING REST OF 7„ PUMPS MM IN/OUT 1.73/1.71 BPM,WOB 3.1K, MOTOR WORK 315 PSI,ECD 10.25 PPG 02:30 PARAMETERS,9377.7' PUMPS MM IN/OUT 1.73/1.72 BPM,WOB 2.6K, MOTOR WORK 322 PSI,ECD 10.25 PPG 03:00 PARAMETERS,9378.2' PUMPS MM IN/OUT 1.73/1.71 BPM,WOB 1.4K, MOTOR WORK 150 PSI,ECD 10.25 PPG 03:30 PARAMETERS,9378.2' PUMPS MM IN/OUT 1.73/1.71 BPM,WOB 0.93K, MOTOR WORK 175 PSI,ECD 10.25 PPG 04:00 PARAMETERS,9379.0'LEAD MILL SHOULD BE FULLY OUT.1.1'TO GO FOR S.R. TO EXIT. PUMPS MM IN/OUT 1.73/1.71 BPM,WOB 0.98K, MOTOR WORK 120 PSI,ECD 10.25 PPG 04:30 PARAMETERS,9379.5' PUMPS MM IN/OUT 1.72/1.71 BPM,WOB 0.84K, MOTOR WORK 65 PSI,ECD 10.25 PPG 04:35 - 06:30 1.92 STMILL P WEXIT MILL RAT HOLE USING 9.5PPG POWER PRO MUD AT-10'/HR WITH TARGET OF 300PSI MW&5.5K WOB 1.73BPM IN/1.72BPM OUT,MTR WRK:200-400 PSI WOB:2.0-4.5K# PVT:307 BBLS,MW IN/OUT:9.54/9.45 PPG ECD/IA/OA:10.24 PPG/179 PSI/128 PSI MILL TO 9389'. 06:30 - 09:00 2.50 STMILL P WEXIT CONDUCT REAM PASSES PER WELL PLAN. AFTER THREE COMPLETE PASSES, CONDUCT A LEFT AND RIGHT SIDE REAM AT 15°OUT FROM WINDOW IN ATTEMPT TO SMOOTH TRANSITION. DRY DRIFT GOOD. PUMP SAMPLE UP FOR GEO. FLOW CHECK OFF BOTTOM,ALL GOOD. Printed 4/6/2015 10:34:39AM North America-ALASKA-BP Page 7 of 17 Operation Summary Report Common Well Name:G-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/11/2015 End Date:3/23/2015 X3-016MH-C:(4.253,243.53) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM Rig Release:3/26/2015 Rig Contractor:NORDIC CALISTA UWI:500292064300 Active datum:ORKB®77.08usft(above Mean Sea Level) Date From-To 1 Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 11:00 2.00 STMILL P WEXIT POH WHILE CHASING HI-VIS SWEEP OUT OF HOLE WITH EDC OPEN. PULL TO SURFACE .WITH NO ISSUES. CONDUCT PJSM FOR BHA CHANGEOUT,FLOW CHECK. FLOW CHECK ALL GOOD. -2 BBLS LOSSES TO FORMATION ON TRIP OUT. 11:00 - 13:00 2.00 DRILL P PROM POP OFF AND BREAKDOWN BHA !COMPONENTS LOOK GOOD. WINDOW MILL GAUGE AT 2.80"NO-GO,STRING MILL AT 2.79" NO-GO. MAKE UP BUILD BHA WITH 2.70"X3.25"BI-CENTER BIT ON 1.35°BEND 1 MOTOR AND BHI TOOLS. STAB ON, PRESSURE TEST QTS. 13:00 - 15:30 2.50 DRILL P PROD1 RIH WITH BUILD ASSEMBLY. LOG TIE-IN WITH-2'. 1-FLUID LEVELS GOOD ON TRIP IN,NO I i LOSSES TO FORMATION. RECORD SLOW PUMP RATES. MW IN AND OUT 9.45 PPG. 15:30 - 00:00 8.50 DRILL P PROD1 GET SPR'S TAG AT 9393'MD CORRECTED DEPTH. FREE SPIN OF 2890 PSI AT 1.6 BPM. DRILL 3.25"BUILD SECTION FROM 9393' -NBI 13° -ROP 8-30'/HR(INITAL) -BPM IN/OUT:1.85/1.85 CIRC PSI:3475 FREE SPIN (50-75PSI MW) -ECD:10.25 PPG(OBD) -MW IN/OUT:9.55 PPG/9.45 PPG !-IA/0A/PVT:215 PSI/189 PSI/302 DHWOB:0.70K LBS-3.6K LBS -85°F IN/85°F OUT PUMP 75BBLS NEW MUD FROM 9464'TO PREP PITS FOR TURNING ON CENTRIFUGES. TURN ON CENTRIFUGE'A'. -DRILL TO MIDNITE DEPTH OF 9483'MD 3/16/2015 00:00 - 04:20 4.33 DRILL P PROD1 CONTINUE TO DRILL 3.25"BUILD SECTION FROM 9483' NBI 11° -ROP 8-30'/HR(INITAL) -BPM IN/OUT:1.85/1.85 CIRC PSI:3252 FREE SPIN (50-75PSI MW) ECD:10.25 PPG(OBD) -MW IN/OUT:9.55 PPG/9.45 PPG -IA/OA/PVT:215 PSI/189 PSI/357 -DHWOB:0.70K LBS-3.6K LBS -85°F IN/85°F OUT -CENTRIFUGE'A'IS ON. 1-BLEED DOWN IA&OA FROM 450PSI TO SLOP TRAILER. -DRILL TO 9587'MD -ISSUES SURVEYING:OBTAINED 3 GOOD SURVEYS ONCE BUILD SECTION WAS INITIATED BUT FOURTH SURVEY WAS NOT "GOOD". INTERPOLATION OF SURVEYS REVEAL DIRECTIONAL PATH APPROXIMATELY 26'BELOW PARENT WELLBORE. TEAM FEELS DIRECTIONAL PATH IS GOOD BUT NOT MEETING BP/BHI SURVEY REQUIREMENTS. Printed 4/6/2015 10:34.39AM North America-ALASKA-BP Page 8 of 17 Operation Summary Report Common Well Name:G-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/11/2015 End Date:3/23/2015 X3-016MH-C:(4,253,243.53) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM Rig Release:3/26/2015 Rig Contractor:NORDIC CALISTA UWI:500292064300 Active datum:ORKB @77.08usft(above Mean Sea Level) Date From-To I Hrs Task Code NPT I NPT Depth Phase Description of Operations (hr) (usft) 04:20 - 08:45 4.42 DRILL N WAIT I 9,587.00 PROD1 SLOWLY WIPER TO THE WINDOW WHILE MAKING NOTIFICATIONS AND VERIFYING SURVEY DATA WITH CHECKSHOTS. 1.7BPM/3094PSI. -TEAM IS IN AGREEMENT THAT NO SURVEY OR DIRECTIONAL VIOLATIONS HAVE TAKEN PLACE,MOVE FORWARD WITH DRILLING 08:45 - 10:45 2.00 DRILL P PROD1 CONDUCT LONG TIE-IN FOR GEO PDC AND RESISTIVITY LOGS. +2'CORRECTION ON LOGGING RUN. -MW IN AND OUT 9.45 PPG WITH NO LOSSES TO FORMATION 10:45 - 15:00 4.25 DRILL P PROD1 RECORD SLOW PUMP RATES. TAG AT 9587'. FREE SPIN OF 2945 PSI AT 1.65 BPM. -1.66 BPM,3043 PSI,WOB 1.3 K,ECD AT 10.2 PPG MW IN 9.49 PPG,MW OUT 9.43 PPG,VERY LITTLE LOSSES TO FORMATION DURING DRILLING -AT 9628'MD THE DD NOTICED A BAD SURVEY. THE TOWN TEAM WAS CONSULTED AND DRILLING CONTINUED. -THE DECISION WAS MADE TO DRILL AHEAD TO 9750'MD TO SEE IF THE SURVEYS WOULD CLEAN UP 15:00 - 19:35 4.58 DRILL P PROD1 DRILL AHEAD TAKING SURVEYS EVERY 10' AND MORE FREQUENTLY AS NECESSARY. -1.66 BPM,3043 PSI,WOB 1.3 K,ECD AT 10.2 PPG -MW IN 9.49 PPG,MW OUT 9.43 PPG,VERY LITTLE LOSSES TO FORMATION DURING DRILLING FIRST GOOD SURVEY AT 9664'MD -GOOD SURVEY AT 9674'MD. -GET SPR'S. -POOR ROP.DRILL TO 9689'. 19:35 - 19:55 0.33 DRILL P PROD1 WIPER TO WINDOW.PUMP 9.5PPG POWER PRO MUD AT 1.9BPM/3400PSI-CLEAN. ,19:55 - 20:00 0.08 DRILL P PROD1 FLOW CHECK AT TOP OF WINDOW-NO FLOW.OPEN EDC. 20:00 - 21:40 1.67 DRILL P PROD1 POH.PUMP THRU EDC AT 2.5BPM/3800PSI. DECENT CUTTINGS GOING OVER SHAKER. PJSM WHILE POH.DIAL UP&SCRIBE 2-3/8" EXTREME MUD MOTOR. 21:40 - 21:50 0.17 DRILL P PROD1 FLOW CHECK-NO FLOW. 21:50 - 22:30 0.67 DRILL P PROD1 POP OFF WELL.PLACE INJECTOR OVER BUNG HOLE&CIRCULATE.BLOW DOWN& PURGE TOOLS.LD TOOLS IN SECTIONS.LD MOTOR.BIT WAS 3-1 WITH 1 PLUGGED NOSE NOZZLE. 22:30 - 23:45 1.25 DRILL P PROD1 ASSEMBLE NEW TOOL&TEST ON CATWALK. 23:45 - 00:00 0.25 DRILL P PROD1 PJSM REGARDING MU TOOL STRING. 3/17/2015 00:00 - 00:45 0.75 DRILL P PROD1 MU BHA FROM SECTIONS.MU INJECTOR TO BHA.STAB ONTO WELL.POWER UP&TEST TOOLS. 00:45 - 01:00 0.25 DRILL P PROD1 TEST QTS 350PSI/4000PSI.OPEN UP&CIRC THRU EDC AT 0.5B_PM/840PSI. 01:00 - 02:45 1.75 DRILL P PROD1 RIH WITH BHA#4.CIRC THRU EDC AT 0.5BPM/85OPSI. Printed 4/6/2015 10 34:39AM North America-ALASKA-BP Page 9 of 17 Operation Summary Report Common Well Name:G-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/11/2015 End Date 3/23/2015 X3-016MH-C:(4,253,243.53) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM Rig Release:3/26/2015 Rig Contractor:NORDIC CALISTA UWI:500292064300 Active datum:ORKB @77.08usft(above Mean Sea Level) Date From-To Hrs I Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:45 - 03:30 0.75 DRILL P PROD1 LOG DOWN FOR TIE-IN FROM 9170'.MINUS 2' CORRECTION. 03:30 - 04:00 0.50 DRILL P PROD1 WIPER TO TD 1.5/2500PSI-CLEAN.PERFORM JORPS. 04:00 - 12:00 8.00 DRILL P PROD1 CONTINUE TO DRILL 3.25"BUILD SECTION I FROM 9683' -NBI 15° -ROP 8-30'/HR(INITAL) -BPM IN/OUT:1.81/1.80 -CIRC PSI:3365 FREE SPIN (50-75PSI MW) -ECD:10.19 PPG(OBD) -MW IN/OUT:9.49 PPG/9.43 PPG -1A/OA/PVT:46 PSI/9 PSI/361 -DHWOB:0.70K LBS-3.6K LBS '-90°F IN/85°F OUT -CENTRIFUGE'A'IS ON. -0.25-0.1 SPURT LOSSES FROM 9695' -DRILL TO 9870'MD CONDUCT KICK WHILE DRILLING DRILL. SIMULATED PIT GAIN. CREW SHUT DOWN DRILLING,CONDUCTED FLOW CHECK WITH NO FLOW. DRILLER QUESTIONED HOW WE !COULD HAVE PIT GAIN,FLOORHAND CHECKED AND SIMULATED WATER HAD BEEN LEFT ON. GOOD AAR THAT GOT THE CREW THINKING OF MAKING PERIPHERAL CHECKS AND NOT FOCUSING ON JUST WELL RELATED ISSUES. 12:00 - 17:30 5.50 DRILL P PROD1 SHORT WIPER WITH NO ISSUES. FREE SPIN OF 3610 PSI AT 1.90 BPM. DRILL AHEAD FROM 9870'. -CONSISTENT RETURNS ACROSS SHAKER. CHERT PERCENTAGE DROPPED FROM EARLIER SAMPLES. DRILLING ROP PICKED UP THROUGHOUT DAY. DRILL TO 10,070'. -1.90 BPM,3610-3740 PSI,1.4-2.6K WOB,ECD CONSISTENT AT 10.25 PPG,ROP INCREASED FROM 24 FPH TO AS MUCH AS 80 FPH -NO LOSSES TO FORMATION THROUGHOUT DRILLING,MW IN 9.52 PPG,MW OUT 9.46 PPG 17:30 - 20 00 2.50 DRILL P PROD1 i CONDUCT LONG WIPER TO WINDOW WHILE BHI/BP DISCUSS SURVEY REQUIREMENTS. PULL INTO WINDOW,OPEN EDC AND CIRCULATE BOTTOMS UP X 2. RECIEVED APPROVAL FROM TOWN TO USE IIFR CORRECTION ON OUR SURVEYS. SENT PREVIOUS SURVEYS TO SPERRY FOR CORRECTION.ALL SURVEYS ARE GOOD TO 9930.8'.SURVEYS DEEPER THAN THAT HAVE FAILED. 20:00 - 21:00 1.00 DRILL P PROD1 -TIE IN AT 9,390'WITH+3'CORRECTION. -RIH AND TAKE SURVEYS AT 9,990',10,020', AND 10,050'.SURVEYS GOOD. -25'/MIN WITH 1.25/1.35 BPM IN/OUT 21:00 - 00:00 3.00 DRILL P PROD1 DRILL AHEAD F/10,070'T/10,114'MD -FS:3330 PSI MTR WRK:200-400 PSI WOB: 2.0-4.0K# -BPM IN/OUT:1.82/1.81 PVT:355 BBLS -MW IN/OUT:9.53/9.44 PPG -ECD/IA/OA:10.26 PPG/510 PSI/411 PSI ROP:20-30 FPH Printed 4/6/2015 10:34:39AM North America-ALASKA-BP Page 10 of 17 Operation Summary Report Common Well Name:G-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/11/2015 End Date:3/23/2015 X3-016MH-C:(4,253,243.53) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM Rig Release:3/26/2015 Rig Contractor:NORDIC CALISTA UWI:500292064300 Active datum:ORKB©77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/18/2015 00:00 - 02:00 2.00 DRILL P PROD1 DRILL AHEAD Fl 10,114'T/10,176'MD -FS:3330 PSI MTR WRK:200-400 PSI WOB: 2.0-4.0K# BPM IN/OUT:1.82/1.81 PVT:352 BBLS MW IN/OUT:9.51/9.44 PPG -ECD/IA/OA:10.27 PPG/550 PSI/430 PSI -ROP:20-30 FPH -DRILL AHEAD TO 10,176'MD(8961'TVD)TO PROGNOSED TOP OF HOT 02:00 - 03:30 1.50 DRILL P PROD1 CIRC UP SAMPLE TO VERIFY HOT PULL UP HOLE WHILE CIRC 10,176'SAMPLE TO SURFACE 5'/MIN WITH 1.82/1.72 BPM IN/OUT -SAMPLES INDICATE TRANSITION ZONE ABOVE HOT RIH TO BOTTOM 03:30 - 10:00 6.50 DRILL P PROD1 DRILL AHEAD F/10,176'T/10,383'MD -FS:3450 PSI MTR WRK:150-300 PSI WOB: 1.5-3.OK# -BPM IN/OUT:1.87/1.85 PVT:350 BBLS -MW IN/OUT:9.51/9.47 PPG -ECD/IA/OA:10.35 PPG/110 PSI/135 PSI -ROP:30-50 FPH -BLEED IA FROM 600 TO 100 PSI,-5 GAL FREEZE PROTECT -BLEED OA FROM 460 TO 100 PSI,-5 GAL FREEZE PROTECT DRILL AHEAD WITH SURVEY VERIFICATION BY SPERRY. GEO HAS CONFIRMED TVD TARGET,DRILL TO 10,383'MD TO REACH TARGET TVD OF 8958'. 10:00 - 12:30 2.50 DRILL P PROD1 FLOW CHECK OFF BOTTOM,ALL GOOD. PICK UP CLEAN,POH TO WINDOW WITH NO ISSUES IN OPEN HOLE. FLOW CHECK AGAIN IN WINDOW,ALL GOOD. OPEN EDC,PUMP AT 2.3 BPM,3530 PSI WHILE PULLING OUT OF HOLE. -MW IN 9.53 PPG,MW OUT 9.48 PPG, RETURNS GOOD WITH SLIGHT(-1 BPH) LOSSES. 12:30 - 14:30 2.00 DRILL P PROD1 POP OFF,LD BHA. BIT GRADE 4-2-BT. OTHER COMPONENTS LOOK GOOD. -CLEAR RIG FLOOR,CONDUCT BOP FUNCTION TEST FROM DRILLER'S CONSOLE, ALL GOOD. -MU LATERAL BHA WITH 3.25"HCC BI-CENTER BIT ON LOW SPEED MOTOR WITH 1.01°AKO BEND AND NEW DIRECTIONAL GAMMA SUB. -STAB ON,PRESSURE TEST QTS. 14:30 - 17:30 3.00 DRILL P PROD1 RIH WITH LATERAL BHA. LOG TIE-IN AT RA TAG WITH+3'CORRECTION. CONTINUE TO RIH AND VERIFY SURVEYS ON TRIP IN. ABLE TO GET GOOD SURVEY DATA WITHOUT USING THE BHI MAGCORR SOFTWARE. VERIFIED 7 SURVEY POINTS ON TRIP IN. -RECORD SLOW PUMP RATES. MW IN 9.51 PPG,MW OUT 9.46 PPG,-1.5 BPH LOSSES TO FORMATION ON TRIP IN. Printed 4/6/2015 10:34:39AM North America-ALASKA-BP -`Page 11 of 17 Operation Summary Report Common Well Name:G-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/11/2015 End Date:3/23/2015 X3-016MH-C:(4,253,243.53) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:OOAM Rig Release:3/26/2015 Rig Contractor:NORDIC CALISTA UWI:500292064300 Active datum:ORKB @77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 00:00 6.50 DRILL P PROD1 DRILL AHEAD F/10,383'T/10,629'MD -FS:3500 PSI MTR WRK:100-400 PSI WOB: 1.0-3.OK# -BPM IN/OUT:1.83/1.82 PVT:334 BBLS -MW IN/OUT:9.55/9.47 PPG -ECD/IA/OA:10.50 PPG/175 PSI/137 PSI -ROP:20-40 FPH THRU SANDY SILT STONE PUMP 20 BBL HI-VIS SWEEP WITH-10% INCREASE IN CUTTINGS -PERFORM 200'WIPERS EVERY 150' DRILLED 3/19/2015 00:00 - 05:00 5.00 DRILL P PROD1 DRILL AHEAD F/10,629'T/10,850'MD -FS:3240 PSI MTR WRK:200-400 PSI WOB: 1.0-2.OK# -BPM IN/OUT:1.68/1.65 PVT:329 BBLS -MW IN/OUT:9.55/9.53 PPG -ECD/IA/OA:10.49 PPG/198 PSI/170 PSI -ROP:20-40 FPH THRU SANDY SILT STONE -PERFORM 200'WIPERS EVERY 150' DRILLED 05:00 - 07:15 2.25 DRILL P PROD1 WIPER UP TO WINDOW 25'/MIN WITH 1.78/1.67 BPM IN/OUT -TIE-IN TO RA-TAG WITH+5'CORRECTION RUN IN HOLE BACK DOWN WITH NO ISSUES;RECORD SLOW PUMP RATES 07:15 - 18:00 10.75 DRILL P PROD1 ON BOTTOM,DRILL AHEAD FROM 10,850'. FREE SPIN OF 3560 AT 1.81 BPM. -1.81-1.85 BPM,3720-4140 PSI,ECD OF 10.5-10.6 PPG,WOB 1.7-3.5K,ROP AS LOW AS 10 FPH BUT AVERAGED 35-45 FPH THROUGHOUT DAY -AVERAGED-1 BPH LOSSES TO FORMATION,MW IN 9.55 PPG,MW OUT 9.50 PPG,DIFFICULTY SLIDING AT TIMES BUT WIPERS HELPED WITH TRANSITION. NEW MUD IS READY BUT WAITING ON TRUCKING TO CONDUCT MUD SWAP. -SLOW ROP THROUGHOUT DAY ATTRIBUTED TO SHALE 18:00 - 21:00 3.00 DRILL P PROD1 DRILL AHEAD F/11,175'T/11,300'MD -FS:3400 PSI MTR WRK:300-400 PSI WOB: 1.0-2.5K# -BPM IN/OUT:1.72/1.70 PVT:304 BBLS -MW IN/OUT:9.57/9.53 PPG -ECD/IA/OA:10.55 PPG/396 PSI/358 PSI -ROP:50-75 FPH THRU SAND -PERFORM 200'WIPERS EVERY 150' DRILLED 21:00 - 23:30 2.50 DRILL P PROD1 WIPER UP TO WINDOW -25'/MIN WITH 1.71/1.58 BPM IN/OUT -TIE-IN TO RA-TAG WITH+5'CORRECTION WIPER BACK TO BOTTOM -35'/MIN WITH 1.75/1.87 BPM IN/OUT -NO PROBLEMS GETTING TO BOTTOM -CUT PUMPS TO 0.75 BPM THRU SHALES UP AND DOWN Printed 4/6/2015 10:34:39AM North America-ALASKA-BP Page 12 of 17 Operation Summary Report Common Well Name:G-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/11/2015 End Date:3/23/2015 X3-016MH-C:(4,253,243.53) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM Rig Release:3/26/2015 Rig Contractor:NORDIC CALISTA UWI:500292064300 Active datum:ORKB @77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:30 - 00:00 0.50 DRILL P PROD1 DRILL AHEAD F/11,300'T/11,325 MD FS:3400 PSI MTR WRK:300-400 PSI WOB: 1.0-2.5K# -BPM IN/OUT:1.73/1.71 PVT:299 BBLS MW IN/OUT:9.56/9.50 PPG -ECD/IA/OA:10.55 PPG/370 PSI/353 PSI -ROP:50-75 FPH THRU SAND -PERFORM 200'WIPERS EVERY 150' DRILLED 3/20/2015 00:00 - 06:15 6.25 DRILL P PROD1 DRILL AHEAD F/11,325 T/11,407'MD -FS:3100 PSI MTR WRK:100-200 PSI WOB: 1.0-2.0K# -BPM IN/OUT:1.69/1.67 PVT:371 BBLS -MW IN/OUT:9.59/9.53 PPG -ECD/IA/OA:10.42 PPG/165 PSI/176 PSI -PERFORM 200'WIPERS EVERY 150' DRILLED -PERFORM MUD SWAP WHILE DRILLING AHEAD SLOW ROP THRU SHALE STARTING AT 11,380'MD 06:15 - 07:00 0.75 DRILL P PROD1 PERFORM WIPER TRIP FROM 11,407'TO 11,000' PUW=38.4K/SOW=16.0K 1.9 BPM IN/1.80 BPM OUT(UP),1.9 BPM IN/ 2.08 BPM OUT(DOWN) CIRCULATING PRESSURE=3,320 PSI(UP), 3540 PSI(DOWN) 20 FPM UP,45 FPM DOWN NO EXCESS PUW OR SOW SEEN. 07:00 - 09:00 2.00 DRILL P PROD1 DRILL AHEAD F/11,40711'T/11,458'MD -FS:3400 PSI MTR WRK:100-200 PSI WOB: 1.0-2.0K# -BPM IN/OUT:1.91/1.90 PVT:369 BBLS -MW IN/OUT:9.58/9.52 PPG ECD/IA/OA:10.51 PPG/245 PSI/225 PSI -ROP PICKED UP WHEN BACK ON BOTTOM TO 25-30 FPH. SAMPLE AT 11,400'SHOWED HARD SILTSTONE AND STICKY CLAY. 09:00 - 09:45 0.75 DRILL P PROD1 PERFORM WIPER TRIP FROM 11,458'TO 10,982' PUW=38.6K/SOW=16.1K 1.9 BPM IN/1.82 BPM OUT(UP),1.9 BPM IN/ 2.05 BPM OUT(DOWN) CIRCULATING PRESSURE=3,350 PSI(UP), 3515 PSI(DOWN) 20 FPM UP,45 FPM DOWN NO EXCESS PUW OR SOW SEEN. 09:45 11:15 1.50 DRILL P PROD1 DRILL AHEAD F/11,458'T/11,506'MD -FS:3400 PSI MTR WRK:100-200 PSI WOB: 1.0-2.2K# -BPM IN/OUT:1.87/1.85 PVT:376 BBLS -MW IN/OUT:9.59/9.55 PPG -ECD/IA/OA:10.55 PPG/309 PSI/284 PSI Printed 4/6/2015 10:34:39AM North America-ALASKA-BP Page 13 of 17 Operation Summary Report Common Well Name:G-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/11/2015 End Date:3/23/2015 X3-016MH-C:(4,253,243.53) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM Rig Release:3/26/2015 Rig Contractor:NORDIC CALISTA UWI:500292064300 Active datum:ORKB @77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:15 - 11:30 0.25 DRILL P PROD1 PERFORM WIPER TRIP FROM 11,506'TO 11,000' PUW=38.6K/SOW=15.6K 1.9 BPM IN/1.82 BPM OUT(UP),1.9 BPM IN/ 2.05 BPM OUT(DOWN) CIRCULATING PRESSURE=2,625 PSI(UP), 3320 PSI(DOWN) 50 FPM UP,75 FPM DOWN NO EXCESS PUW OR SOW SEEN. PUMP 20 BBLS LO-VIS SWEEP TO ARRIVE ON BOTTOM WHEN WE GET BACK TO BOTTOM. 11:30 - 13:50 2.33 DRILL P PROD1 DRILL AHEAD F/11,506'T/11,602'MD -FS:3500 PSI MTR WRK:100-200 PSI WOB: 1.0-3.0K# BPM IN/OUT:1.88/1.87 PVT:398 BBLS MW IN/OUT:9.61/9.51 PPG -ECD/IA/OA:10.55 PPG/292 PSI/284 PSI -LO-VIS SWEEP BROUGHT BACK NO EXTRA CUTTINGS 13:50 - 14:25 0.58 DRILL P PROD1 PERFORM WIPER TRIP FROM 11,602'TO 10,988' PUW=38.0K/SOW=16.5K 1.89 BPM IN/1.92 BPM OUT(UP),1.65 BPM IN /2.06 BPM OUT(DOWN) CIRCULATING PRESSURE=2,845 PSI(UP), 3,450PSI(DOWN) 35 FPM UP,43 FPM DOWN NO EXCESS PUW OR SOW SEEN. PUMP 20 BBLS LO-VIS SWEEP TO ARRIVE ON BOTTOM WHEN WE GET BACK TO BOTTOM. -SAMPLE AT 11,550'SHOWED 15%SHALE WITH 85%SANDSTONE WITH CLAY MATRIX. 14:25 - 15:45 1.33 DRILL P PROD1 DRILL AHEAD F/11,602'T/11,621'MD -FS:3500 PSI MTR WRK:100-200 PSI WOB: 1.0-3.0K# -BPM IN/OUT:1.88/1.87 PVT:401 BBLS -MW IN/OUT:9.61/9.51 PPG -ECD/IA/OA:10.55 PPG/292 PSI/284 PSI -LO-VIS SWEEP BROUGHT BACK NO EXTRA CUTTINGS -ROP AVERAGED 5-7 FPH DURING THE LAST HOUR.DECISION TO POOH FOR BIT.WILL PICK UP AGITATOR ON THIS RUN AS WELL. 15:45 - 19:00 3.25 DRILL P PROD1 FLOWCHECK OFF BOTTOM-WELL STATIC. -POOH AT 26 FPM TO WINDOW -MM IN/OUT=1.84/1.70 BPM,MW IN/OUT= 9.61/9.53 PPG,PUMP PRESSURE=3,375 PSI, PUW=36.8K -FLOW CHECK AT TOP OF WINDOW-WELL STATIC. -OPEN EDC AND POOH AT 100 FPH -MM IN/OUT=2.02/1.61 BPM,MW IN/OUT= 9.59/9.55 PPG,PUMP PRESSURE=2920 PSI, PUW=26.0K -FLOW CHECK AT SURFACE-WELL STATIC 19:00 - 20:00 1.00 DRILL P PROD1 PJSM AND LD DRILLING ASSEMBLY -POP OFF,STAND BACK INJECTOR -BLOW DOWN AND LD 2-3/8"COILTRAK -LD MOTOR AND MILL -MOTOR MISSING PIECE OF HARD BANDING -BIT GRADE:1-2-CT-G-X-I-BT-ROP -BREAK OFF UQC Printed 4/6/2015 10:34:39AM North America-ALASKA-BP Page 14 of 17 Operation Summary Report Common Well Name:G-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/11/2015 End Date:3/23/2015 'X3-016MH-C:(4,253,243.53) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM Rig Release:3/26/2015 Rig Contractor.NORDIC CALISTA UWI:500292064300 Active datum:ORKB®77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:00 - 21:30 1.50 DRILL P PROD1 PJSM AND PERFORM CHROME MGMT -CUT OFF CTC,RU HYDRAULIC CUTTER -CUT 100'OF COIL AND E-LINE,RD CUTTER -TEST E-LINE CONNECTION,GOOD TEST -INSTALL CTC,PULL TEST 35K#,PRESS TEST 250/3500 PSI 21:30 - 23:30 2.00 DRILL P PROD1 PJSM AND HEAD UP BHI -MAKE UP UQC WITH DART FLOATS -TEST E-LINE CONNECTION,GOOD TEST -PRESS TEST TO 250/3500 PSI 23:30 - 00:00 0.50 DRILL P PROD1 PJSM AND PU DRILLING ASSEMBLY PU NEW MOTOR AND AGITATOR -PU REBUILD HUGHES 3.25"BI-CENTER BIT -PU 2-3/8"COILTRAK WITH RESISTIVITY -PU'INJECTOR ***HOLD COMPLEX KICK WHILE MU BHA DRILL*** -ADD COMPLEXITY AS RED WINCH IN USE WHILE MOVING INJECTOR -ADD HYDRAULIC FAILURE,UNABLE TO USE BLUE WINCH -ADD PIPE LIGHT SCENARIO WITH ONLY BHA IN THE HOLE -GOOD CREW RESPONSE,ABLE TO QUICKLY _ FIND MEANS TO SHUT-IN WELL 3/21/2015 00:00 - 00:30 0.50 DRILL P PROM CONTINUE AND PU DRILLING ASSEMBLY -CONTINUE PU INJECTOR,GET ON WELL -PRESS TEST QTS TO 250/3500 PSI 00:30 - 01:00 0.50 DRILL P PROD1 HOLD AAR FOR COMPLEX KICK WHILE MU BHA DRILL -DISCUSS HOW TO RESPOND TO HYDRAULIC FAILURE I-DISCUSS BHA SPACEOUT AND LOCATION 1 OF UPSETS/NECKS ACROSS BOP STACK 01:00 - 04:00 3.00 DRILL P PROD1 RIH WITH DRILLING ASSEMBLY -100'/MIN WITH 0.45/0.81 BPM IN/OUT TIE-IN WITH+4'CORRECTION WIPER TO BOTTOM -35'/MIN WITH 1.57/1.70 BPM IN/OUT PUMP MIN RATE THRU SHALE 10,550- •10,650'MD •-TAG BOTTOM AT 11,620'MD -TRIP TO BOTTOM SMOOTH 04:00 - 06:00 2.00 DRILL P PROD1 DRILL AHEAD F/11,621'T/11,658'MD -FS:3350 PSI MTR WRK:100-200 PSI WOB: 1.0-3.0K# -BPM IN/OUT:1.71/1.68 PVT:386 BBLS -MW IN/OUT:9.61/9.55 PPG -ECD/IA/OA:10.50 PPG/134 PSI/63 PSI PERFORM FREQUENT WIPERS AS NEEDED FOR WT TRANSFER Printed 4/6/2015 10:34:39AM North America-ALASKA-BP Page 15 of 17 Operation Summary Report Common Well Name:G-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/11/2015 End Date:3/23/2015 X3-016MH-C:(4,253,243.53) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM Rig Release:3/26/2015 Rig Contractor:NORDIC CALISTA UWI:500292064300 Active datum:ORKB @77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 18:00 12.00 DRILL P PROD1 DRILL AHEAD FROM 11,658'WITH VERY SLOW ROP THROUGHOUT DAY UP TO 11,725'. CHANGED INCLINATION AND ABLE TO BREAK THROUGH SHALE AND GAIN ROP. -CONDUCTED FREQUENT SHORT WIPERS AND ONE EXTENDED WIPER WHILE BATTLING ROP. WIPERS HELPED WITH WEIGHT TRANSITION TO BIT BUT STILL HAD SLOW ROP. -VARIED FLOW FROM 1.60-1.85 BPM, 3230-3860 PSI CIRCULATION PRESSURE, 30-230 PSI IN MOTORWORK THROUGHOUT DAY,1.35-3.0K WOB,ECD RANGE 10.4-10.6 PPG -SLIGHT LOSSES TO WELL THROUGHOUT DRILLING,LESS THAN 1 BPH LOSSES. MW IN 9.6 PPG,MW OUT 9.55 PPG. 18:00 - 19:30 1.50 DRILL P PROD1 DRILL AHEAD F/11,943'T/12,005'MD -FS:3800 PSI MTR WRK:100-200 PSI WOB: 1.0-1.5K# BPM IN/OUT:1.81/1.79 PVT:382 BBLS -MW IN/OUT:9.64/9.57 PPG -ECD/IA/OA:10.55 PPG/355 PSI/299 PSI DRILL AHEAD TO 12,005'MD.LOSE MTR WRK AND ATTEMPT TO PICK UP,CANNOT MOVE UP. 19:30 - 21:00 1.50 DRILL N STUC 12,005.00 PROD1 WORK TO FREE STUCK COIL -PU TO 70K#AND SO TO-10K#5 TIMES,NO MOVEMENT -DROP BACK TO NEUTRAL WEIGHT -CIRC BU AT 1.77/1.74 BPM IN/OUT WITH 3700 PSI -NOTIFY SUPERINTENDENT -DOWN ON PUMP,RELAX HOLE 5 MIN -PU TO 70K#AND SO TO-10K#3 TIMES,NO MOVEMENT -BREAK CIRC TO PREVENT FREEZING -DOWN ON PUMP,RELAX HOLE 20 MIN -PU TO 70K#AND SO TO-10K#3 TIMES,NO MOVEMENT 21:00 - 23:00 2.00 DRILL N STUC 12,005.00 PROD1 SPOT MINERAL OIL TO FREE STUCK COIL -PUMP 20 BBLS MINERAL OIL PER WELLPLAN -CIRC TO BIT AT 1.65/1.64 BPM IN/OUT -SPOT 10 BBLS OUT BIT AND ALLOW TO SOAK 20 MIN -PU AND COME FREE AT 42K#UP WT -WIPER UP HOLE SLOWLY WHILE CIRC OUT REMAINING MINERAL OIL -WIPER BACK TO BOTTOM TO DISPLACE HOLE BACK TO CLEAN MUD 23:00 - 00:00 1.00 DRILL N STUC 12,005.00 PROD1 WIPER TO WINDOW TO TIE-IN -CHASE MINERAL OIL OUT OF HOLE -25'/MIN WITH 1.60/1.50 BPM IN/OUT -WIPER TO 9750'MD(MIDNIGHT DEPTH) Printed 4/6/2015 10:34:39AM North America-ALASKA-BP Page 16 of 17 Operation Summary Report Common Well Name:G-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:3/11/2015 End Date:3/23/2015 X3-016MH-C:(4,253,243.53) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM Rig Release:3/26/2015 Rig Contractor:NORDIC CALISTA UWI:500292064300 Active datum:ORKB @77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/22/2015 00:00 - 02:00 2.00 DRILL N STUC 12,005.00 PROD1 CONTINUE WIPER TO WINDOW FROM 9750' MD -CHASE MINERAL OIL OUT OF HOLE,TAKE MINERAL OIL RETURNS TO CUTTINGS BOX. -29'/MIN WITH 1.76/1.65 BPM IN/OUT TIE-IN WITH+12.5'CORRECTION WIPER DOWN TO BOTTOM 35'/MIN WITH 1.70/1.80 BPM IN/OUT -REDUCE PUMPS TO 0.75 BPM THRU SHALE -STACK WT AT 11,720'MD.REDUCE PUMPS AND GET PAST. 02:00 - 06:00 4.00 DRILL P PROD1 DRILL AHEAD F/12,005'T/12,143'MD -FS:3450 PSI MTR WRK:100-200 PSI WOB: 1.0-1.5K# -BPM IN/OUT:1.65/1.63 PVT:320 BBLS -MW IN/OUT:9.61/9.55 PPG -ECD/IA/OA:10.56 PPG/271 PSI/243 PSI -FREQUENT BHA WIPERS FOR HOLE CLEANING AND WT TRANSFER '06:00 - 14:00 8.00 DRILL ' P PROD1 DRILL AHEAD FROM 12,143'. CONDUCT FREQUENT SHORT WIPERS TO HELP WITH DRILLING. ADJUST INCLINATION IN ATTEMPT TO GET ABOVE SHALE CAP. ROP PICKED UP AT THIS POINT. -PUMPED A 20 BBL LO-VIS PILL TO BOTTOM, CHASE UP HOLE IN ATTEMPT TO MAKE PROGRESS. NO REAL CHANGE IN TRANSFER OF COIL WEIGHT,SHAKER RETURNS INCREASED—10%WITH RETURN OF PILL. DRILLING DID PICK UP BUT CANNOT ATTRIBUTE IT TO PILL OR TO CHANGE IN FORMATION OR TO COMBINATION OF BOTH AT THIS POINT. -DRILLED WITH RANGE OF-11.6 TO-16.9K COIL WEIGHT DURING THIS DRILLING PERIOD,ADD 1%LUBRICANT TO SYSTEM WHILE DRILLING AHEAD IN ATTEMPT TO HELP SLIDING -1.78-1.80 BPM,3750-4010 PSI,1.4-2.35K WOB,ECD STEADY AT 10.5 PPG,ROP FROM 25-52 FPH 14:00 - 14:15 0.25 DRILL P PROD1 CONDUCT KICK WHILE TRIPPING DRILL, CONDUCT FLOW CHECK WITH SIMULATION OF FLOWAT PITS. FOLLOW STANDING ORDERS BUT SIMULATE FAILURE OF HCR AND MANUAL CHOKE VALVE FOR COMPLEXITY. CLOSED NEXT VALVE PER COMPLEX DRILL HANDBOOK. CONDUCT AAR,DISCUSS STANDING ORDERS AND SEQUENCE OF VALVE/RAM CLOSURES. ALSO DISCUSSED MONITORING OF PRESSURES IF THE WELL WERE SHUT-IN. 14:15 - 18:00 3.75 DRILL P PROD1 FREE SPIN AT 1.80 BPM IS 3950 PSI. DRILL AHEAD FROM 12,325'WITH SHORT WIPERS EVERY 50'DRILLED. -1.78-1.80 BPM,3750-4010 PSI,1.4-2.35K WOB,ECD STEADY AT 10.5 PPG,ROP FROM 25-52 FPH DRILL AHEAD TO 12,500'MD.CALL TD AT END OF POLYGON. Printed 4/6/2015 10:34:39AM North America-ALASKA-BP Page 17 of 17 Operation Summary Report Common Well Name:G-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) • Start Date:3/11/2015 End Date:3/23/2015 X3-016MH-C:(4,253,243.53) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM Rig Release:3/26/2015 Rig Contractor:NORDIC CALISTA UWI:500292064300 Active datum:ORKB @77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 20:00 2.00 DRILL P PROD1 WIPER UP TO WINDOW -29'/MIN WITH 1.78/1.63 BPM IN/OUT -TIE-IN WITH+10'CORRECTION 20:00 - 21:00 1.00 DRILL P PROD1 CIRC BU WHILE PERFORM CCL FOR TOL PLACEMENT CCL FROM 9040'TO 9370'MD -CIRC BU AT 2.10 BPM AND 3500 PSI 21:00 - 22:30 1.50 DRILL P PROD. WIPER DOWN TO CONFIRM TD -37'/MIN WITH 1.70/1.82 BPM -REDUCE PUMP TO 0.5 BPM THRU SHALE. STACK WT AT 10,592'MD WITH PUMP AT 0.5 • BPM.PU AND GET PAST WITHOUT REDUCING PUMP FURTHER. -TAG BOTTOM AT 12,502'MD 22:30 - 00:00 1.50 DRILL P • PROD1 POOH LAYING IN LINER RUNNING PILL -FLOWCHECK OFF BOTTOM,NO FLOW -25'/MIN PUMP MIN RATE 0.5 BPM -POOH TO 10,500'MD(MIDNIGHT DEPTH) 3/23/2015 00:00 - 00:45 0.75 DRILL P PROD1 POOH LAYING IN LINER RUNNING PILL FROM 10,500'MD -25'/MIN PUMP MIN RATE 0.5 BPM -PULL INTO WINDOW,OPEN EDC FLOWCHECK IN WINDOW,NO FLOW 00:45 - 02:30 1.75 DRILL P PROD1 POOH WITH DRILLING ASSEMBLY -85'/MIN WITH 2.10/1.75 BPM IN/OUT • -PAINT TD FLAG AT 9100'EOP -PAINT WINDOW FLAG AT 5950'EOP -FLOW CHECK ON SURFACE,NO FLOW 02:30 - 03:30 1.00 DRILL P PROD1 PJSM AND LD DRILLING ASSEMBLY -POP OFF,STAND BACK INJECTOR -BLOW DOWN TOOL -LD 2-3/8"COILTRAK -LD AGITATOR,MOTOR,AND BIT -BIT GRADE:3-1-RO-N-X-I-BT-TD -BREAK OFF UQC,CUT OFF SLB CTC END RON EVENT AND BEGIN CON EVENT j FOR G-16B ON 03/23/2015 03:30. Printed 4/6/2015 10:34 39AM North America-ALASKA-BP Page 1 of 10 Operation Summary Report Common Well Name:G-16 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/23/2015 End Date:3/26/2015 X3-016MH-C:(1.049,559.00) Project:Prudhoe Bay • Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:OOAM Rig Release:3/26/2015 Rig Contractor:NORDIC CALISTA UWI:500292064300 Active datum:ORKB©77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 3/23/2015 03:30 - 04:00 0.50 CASING RUNPRD PJSM AND PUMP OUT SLACK -MOVE INJECTOR OVER BUNGHOLE -PUMP OUT SLACK,CUT 195'E-LINE(250' SLACK CALCULATED) 04:00 - 04:30 0.50 CASING P RUNPRD PJSM AND INSTALL BOT EXTERNAL CTC -BOOT E-LINE,DRESS COIL END -INSTALL BOT EXTERNAL CTC PULL TEST TO 35K# -PRESS TEST TO 250/3500 PSI 04:30 - 05:30 1.00 CASING P • RUNPRD PJSM AND PUMP 3/4"DRIFT BALL -MAKE UP STINGER AND NOZZLE -LAUNCH 3/4"DRIFT BALL,CIRC REEL VOL AT 2.35 BPM BALL RECOVERED 0530 - 07:00 1.50 CASING P RUNPRD RIG UP TO RUN 2-3/8"LINER -CLEAR FLOOR,STAND INJECTOR ON LEGS • -RU ELEVATORS,FLOOR VALVE AND XO -RU LINER DRIFT,FILL UP HOSE -DRESS AND RU POWER TONGS -WSL,NORDIC TOURPUSHER,DRILLER,AND BTT REP COUNT AND VERIFY PIPE COUNT IN SHED.FLAG EXTRA JOINTS NOT TO BE RUN. VERIFY SAFETY JOINT MAKE-UP AND FLOOR VALVE POSITION. 07:00 - 12:15 5.25 CASING P RUNPRD I CONDUCT PJSM ON RUNNING LINER, DISCUSS EXCLUSION ZONES,WORKING WITH TONGS,OVERHEAD WORK,STOPPING THE JOB. MU 2-3/8"LINER ASSEMBLY PER WELL •PLAN. CONDUCT KICK WHILE MAKING UP LINER DRILL AT JOINT 30. CREW RESPONDED IMMEDIATELY FOLLOWIG STANDING ORDERS BY STABBING IN FLOOR SAFETY VALVE,CLOSING IT IN,AND SHUTTING IN ANNULAR COMPONENT. VERY • GOOD RESPONSE. -COMPLETE MAKING UP LINER PER PROGRAM WITH NO ISSUES:SHOE TRACK WITH 1 JT 2-3/8"L-80 STL,105 JTS L-80 TH511 WITH A 10'RA TAGGED MARKER JOINT SET BETWEEN JOINTS 42 AND 43. MAKE UP PUP JT AND DEPLOYMENT SLEEVE ASSEMBLY WITH PUP AT TOP OF STRING TO RUNNING BHA. MAKE UP TO COIL. PRESSURE TEST QTS. Printed 4/6/2015 10:35:05AM North America-ALASKA-BP Page 2 of 10 Operation Summary Report Common Well Name:G-16 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/23/2015 End Date:3/26/2015 X3-016MH-C:(1,049,559.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM Rig Release:3/26/2015 Rig Contractor NORDIC CALISTA UWI:500292064300 Active datum:ORKB @77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:15 - 15:45 3.50 CASING P RUNPRD RIH WITH LINER ASSEMBLY. FLAG AT WINDOW ON DEPTH. PUW AT WINDOW 35K. MOVE INTO OPEN HOLE,INITIAL SOW 17.2K. RUN IN WENT WELL,SOW WEIGHT DROPPED TO AS LOW AS 13K,AVERAGE SOW WHILE RIH-14K. -TAG AT 12,298'. PICK UP CLEAN AT 42-43K. ADJUST PUMP RATE AND MOVE BACK DOWN IN ATTEMPT TO MOVE PAST. MAKE TWO ATTEMPTS,NOT SUCCESSFUL. PICKUP FROM 12,300'HEAVY ON THIRD ATTEMPT AT 50-51K WHILE PULLING THROUGH 12,290'UP TO 12,200'. (ONLY SHALE NOTED IN THIS AREA IS 12,220-12,240'). MOVE BACK DOWN WITH HALF THE SOW AT 5-7K WITH INCREASE IN CIRCULATION PRESSURE FROM-800 PSI TO 1100-1300 PSI. KEEP PUMPS OFF AND SET DOWN 6K. POP THROUGH AT 12,300'AND KEEP MOVING DOWN WITH NO PUMPS. GOOD MOVEMENT DOWN UNTIL 12,450'. TAG AT 12,450',WORK THROUGH WITH NO PUMPS. MOVE TO BOTTOM,TAG AT 12,505' UNCORRECTED DEPTH;SET DOWN WEIGHT 'AT 10K. PICK UP WITH PUW OF 42K. MOVE BACK DOWN AND TAG AT 12,507'WITH 13K SET DOWN WEIGHT. PICK UP AGAIN, RECORD 45K BREAKOVER AT 12,493',42K PUW. -MOVE BACK DOWN TO 12,507'WITH 10K DOWN WEIGHT 15:45 - 18:00 2.25 CASING N SFAL 12,502.00 RUNPRD PJSM AND LAUNCH 5/8"BALL -POSITION KCL FOR BALL DROP.VERIFY 5/8" BALL,PLACE BALL INTO DROPPER,LAUNCH BALL. -CIRCULATE DOWN AT 0.75 BPM AND 1800 PSI.CIRC 80 BBLS,BALL DID NOT LAND. -POSITION CLEAN WATER AT BALL DROP. 18:00 - 20:00 2.00 CASING P RUNPRD LAUNCH 2ND ALUMINUM 5/8"BALL. -CIRCULATE DOWN AT 0.80 BPM AND AND 1800 PSI. -WITH 168 BBLS AWAY(87 BBSL ON 2ND BALL),SHUT DOWN AND SURGE PUMPS TO 3200 PSI.LAND BALL ON SEAT. -PRESS UP,POSITIVE INDICATION OF SHEAR AT 2600 PSI. -PU TO BREAKOVER OF 32K AT 12,498'MD, VERIFY RELEASED FROM LINER.SET BACK DOWN WITH 5K AT 12,506'. -PU TO BREAKOVER OF 34K AT 12,497'MD, SET BACK DOWN WITH 10K AT 12,507'MD. 20:00 - 21:30 1.50 CEMT P RUNPRD DISPLACE WELL TO KCL -INITIAL 1.95/1.94 BPM IN/OUT WITH 3970 PSI -FINAL 2.10/2.03 BPM IN/OUT WITH 2950 PSI -SIMOPS:RIG UP CEMENTERS 21:30 - 22:30 1.00 CEMT P RUNPRD PJSM AND PRESS TEST CEMENTERS -VERIFY LINE UP AND PUSH KCL TO CEMENTERS -WSL PERFORM PRESSURE CROSSCHECK CHECKLIST WITH PUMP TRUCK OPERATOR -PRESS TEST TO 250/5000 PSI FOR 5/5 MIN Printed 4/6/2015 10:35:05AM North America-ALASKA-BP Page 3 of 10 Operation Summary Report Common Well Name:G-16 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/23/2015 End Date:3/26/2015 X3-016MH-C:(1,049,559.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM Rig Release:3/26/2015 Rig Contractor:NORDIC CALISTA UWI:500292064300 Active datum:ORKB @77.08usft(above Mean Sea Level) Date From-To Hrs Task Code I NPT NPT Depth Phase Description of Operations (hr) (usft) _ 22:30 - 00:00 1.50 CEMT N DPRB 12,502.00 RUNPRD CIRC BU THRU MUD GAS SEPERATOR -LINE BACK UP TO PUMP DOWN COIL -RETURNS GAS CUT,SEE 5-8%LEL READING OVER SHAKERS -FLOW CHECK,NO FLOW -CALL SUPERINTENDENT AND GET APPROVAL TO CIRC BU THRU MGS -SEE GAS CUT RETURNS FOR—100 BBLS PUMPED -ALL FLOW CHECKS SHOW NO FLOW -INITIAL 2.21 BPM WITH 3450 PSI -FINAL 2.10/1.97 BPM IN/OUT WITH 4000 PSI 3/24/2015 00:00 - 01:00 1.00 CEMT N DPRB 12,502.00 RUNPRD CONTINUE CIRC BU THRU MUD GAS SEPERATOR -SEE GAS CUT RETURNS FOR 100 BBLS PUMPED -CLEAN KCL UP TO WEIGHT AFTER 100 BBLS -ALL FLOW CHECKS SHOW NO FLOW -INITIAL 2.21 BPM WITH 3450 PSI -FINAL 2.10/1.97 BPM IN/OUT WITH 4000 PSI -PUMP TOTAL 200 BBLS THRU MGS Printed 4/6/2015 10:35.05AM North America-ALASKA-BP Page 4 of 10 Operation Summary Report Common Well Name:G-16 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/23/2015 End Date:3/26/2015 X3-016MH-C:(1,049,559.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM Rig Release:3/26/2015 Rig Contractor:NORDIC CALISTA UW:500292064300 Active datum:ORKB @77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:00 - 03:15 2.25 CEMT P RUNPRD PJSM AND PUMP 20.3 BBL 15.3 PPG CEMENT -01:00 HOLD PJSM WITH NORDIC CREW,SLB CEMENTERS,&CH2M TRUCKING. -01:20 BATCH UP CEMENT,CONDUCT LAST WALK THROUGH OF LINES. -01:54 CEMENT AT DENSITY AT 15.3 PPG. -02:04 PUMP 20.3 BBLS OF 15.3 PPG CEMENT. -INITIAL CIRC PRESSURE AT 1187 PSI AT 1.0 BPM. -FINAL CIRC PRESSURE 2450 PSI AT 1.26 BPM. -02:22 SWAP OVER TO RIG PUMPS AND PUSH CEMENTERS EXAUST PILL TO CLEAR LINE. -02:25 RIG PUMPS DOWN COIL AND DISPLACE WITH 8.5 PPG EXHAUST PILL(KCL BASE POWERVIS). -INITIAL DISPLACEMENT 1.0 BPM, INCREASE TO 1.6 BPM,CAUGHT CEMENT AT 24.5 BBLS AWAY. -MAINTAIN RATE OF 1.6 BPM,3250 PSI FOR 33.4 BBLS,FINAL DISPLACEMENT RATE OF 1.6 BPM AT 2500 PSI. -02:33 SLOW PUMPS TO 0.75 BPM WITH CEMENT AT RUNNING TOOLS.STAGE BACK UP TO 1.6 BPM AT 2700 PSI. -02:43 CEMENT AT SHOE.ZERO OUT MM. TAKE RETURNS TO PIT 4.INITIAL STRAP=0.0 BBLS. -3.6 BBL LOSSES WHILE DISPLACING CEMENT TO SHOE. -WITH CEMENT AROUND THE CORNER, PRESSURE INCREASE TO 3400 PSI AT 1.5 BPM. -02:46 SHUT DOWN WITH 2 BBLS CEMENT ABOVE LINER WIPER PLUG. -02:46 PICK UP TO BREAKOVER PLUS 12 FEET TO 12,486'MD. 02:49 SIDE EXHAUST 2 BBLS CEMENT AND 3 BBLS EXHAUST PILL.OPEN BAKER CHOKE. -02:55 SET BACK DOWN TO 12,507'WITH 10K#COMPRESSION.CLOSE BAKER CHOKE. -02:57 BRING UP PUMPS AND SHEAR LINER WIPER PLUG AT 0.3 BBLS,3500 PSI. 02:58 CONTINUE WITH DISPLACING LINER WIPER PLUG. -INITIAL DISPLACEMENT AT 1.5 BPM AND 3400 PSI. -FINAL DISPLACEMENT AT 1.5 BPM AND 4250 PSI. -03:05 LAND PLUG AT 12.7 BBLS,4250 PSI. (CALC DISPLACEMENT TO BUMP 12.2 BBLS.) -BRING PRESSURE UP TO 4500 PSI AND PUMP PAST PLUG.IMMEDIATELY DOWN ON PUMPS. -HOLD 3500 PSI TO VERIFY PLUG ON SEAT. -MM OUT TOTAL=20.2 BBLS.PIT 4 STRAP= 20 BBLS. -03:08 OPEN BAKER CHOKE,BLEED PRESSURE. CHECK FLOATS,FLOATS HOLD. -03:10 PRESSURE UP TO 2000 PSI AND Printed 4/6/2015 10:35:05AM North America-ALASKA-BP Page 5 of 10 Operation Summary Report Common Well Name:G-16 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/23/2015 End Date:3/26/2015 X3-016MH-C:(1,049,559.00) Project Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM Rig Release:3/26/2015 Rig Contractor:NORDIC CALISTA UWI:500292064300 Active datum:ORKB i 77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) SLOWLY PICK UP UNTIL PRESSURE DROP TO 1200 PSI. -03:12 BEGIN DISPLACEMENT WITH 5 BBLS OF CONTAMINATION FLUID ABOVE DEPLOYMENT SLEEVE. 03:15 - 05:00 1.75 CEMT P RUNPRD POOH WITH LINER RUNNING TOOLS -FLOW CHECK ABOVE LINER,NO FLOW -851MIN WITH 2.79/2.42 BPM IN/OUT -TAKE CEMENT CONTAMINATED RETURNS TO CUTTINGS BOX -FLOW CHECK ON SURFACE,NO FLOW 05:00 - 06:00 1.00 CEMT P RUNPRD PJSM AND LD LINER RUNNING TOOLS -POP OFF,STAND BACK INJECTOR -LD 4 JTS 2-1/16"CSN AND SELBRT • -TOOL FUNCTIONED AS DESIGNED -RECOVER ALUMINUM 5/8"BALL -DID NOT RECOVER 5/8"STEEL BALL 06:00 - 07:00 1.00 CEMT N SFAL RUNPRD MAKE UP NOZZLE ON END OF COIL TO 'ATTEMPT TO CIRCULATE OUT 5/8"BALL. -SET INJECTOR OVER BUNG HOLE. -CIRCULATE AT.5 BPM. -NO BALL RECOVERED. 07:00 - 09:00 2.00 CEMT N SFAL RUNPRD SNAKE THE HARD LINE UPSTREAM OF THE REEL TO LOOK FOR 5/8 STEEL BALL-NOTHING FOUND. -SHUT IN WELL ON SWAB VALVE. -STAB INJECTOR ONTO WELL. -COIL HAS NOZZLE MADE UP ON END FOR BALL RECOVERY. -LINE UP AND PUMP 3/4"STEEL BALL TO ATTEMPT TO RECOVER 5/8"STEEL BALL. -PUMP AT 2.68 BPM AT 2970 PSI. -PUMP 70 BBLS. -BREAK OFF INJECTOR FROM WELL. -RECOVERED 3/4"STEEL BALL BUT NO 5/8" BALL 0900 - 09'30 0.50 CEMT N SFAL RUNPRD LINE UP AND PUMP 7/8"STEEL BALLAROUND TO ATTEMPT RECOVERY OF 5/8"STEEL BALL. -STAB INJECTOR ONTO WELL. -COIL HAS NOZZLE MADE UP ON END FOR BALL RECOVERY. ,-PUMP AT 2.6 BPM AT 2750 PSI. -PUMP 36 BBLS. -BREAK OFF INJECTOR FROM WELL. -NO BALL RECOVERED. • 09:30 - 10:00 0.50 CEMT N SFAL RUNPRD BLOW BACK FLUID INTO COIL FOR FREEZE PROTECT. -PJSM. -BLOW BACK COIL TUBING WITH AIR. -STAB COIL INTO BUNGHOLE. -LOCKOUT AND TAG OUT PUMP AND COIL CONTROLS FOR BREAKING APART HARD LINE. Printed 4/6/2015 10:35:05AM North America-ALASKA-BP Page 6 of 10 Operation Summary Report Common Well Name:G-16 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/23/2015 End Date:3/26/2015 X3-016MH-C:(1,049,559.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM Rig Release:3/26/2015 Rig Contractor:NORDIC CALISTA UWI:500292064300 Active datum:ORKB @77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 15:30 5.50 BOPSUR P OTHCMP SECURE TREE AND LEAK TIGHT TEST. -SENSOR ON WING VALVE FOR MONITORING BELOW SWAB VALVE. -SWAP OUT 2-3/8"COMBI RAMS TO 1"COMBI RAMS. • -TEST 1"COMBIS AND ANNULAR TO 250/3500 PSI AS PER NORDIC AND AOGCC REGULATIONS. -FUNCTION TEST ALL RAMS. • *SIM-OPS:BREAK APART HARD LINE BEFORE • COIL REEL FOR 5/8"STEEL BALL RECOVERY. -NO BALL FOUND. -RE-ASSEMBLE HARD LINE. •-LINE UP TO PUMP DOWN COIL INTO •BUNGHOLE. -WARM UP LINES AND ESTABLISH CIRCULATION THROUGH COIL. -DROP AND PUMP 7/8"STEEL BALL • THROUGH COIL AT 1.5 BPM. AT 14 BBLS AWAY,HEARD A SECOND BALL RATTLING THRU COIL. -PUMP TOTAL OF 36 BBLS. SHUT DOWN PUMPS,PICK UP INJECTOR 'AND BREAK OFF NOZZLE. RECOVERED 7/8"AND 5/8"BALLS. 15:30 - 21:00 5.50 EVAL P OTHCMP PICKUP BAKER-ATLAS MEMORY LOGGING TOOLS FROM GROUND. -VERIFY TIMING SEQUENCE WITH BAKER-ATLAS AND WELL SITE LEADER. • '-ENGAGE TOOL AT 16:00 HRS.TOOL SET TO TURN ON AT 22:00 HRS. -MAKE UP LOGGING TOOLS PER BAKER ATLAS. -MAKE UP 104 JTS WITH MARKER JOINT OF •1"CS HYDRIL PIPE AND RUN IN HOLE. • ***DAY CREW WELL CONTROL DRILL:KICK WHILE TRIPPING WITH 1"CSH DRILL.GOOD RESPONSE TIME BY ALL CREWS FOLLOWED BY GOOD AAR. -BREAK CIRCULATION AT 30,60,AND 90 JTS RUN ***NIGHT CREW WELL CONTROL DRILL:KICK WHILE TRIPPING WITH 1"CSH DRILL.GOOD RESPONSE TIME BY ALL CREWS FOLLOWED BY GOOD AAR. -MU RUNNING TOOLS AND 4 JTS 2-1/16"CSH -PU INJECTOR,GET ON WELL -PRESS TEST QTS TO 250/3500 PSI 21:00 - 22:30 1.50 EVAL P OTHCMP RIH WITH LOGGING ASSEMBLY TO 9000'MD -95'/MIN WITH 0.54/0.88 BPM IN/OUT -TOOL TURN ON AT 22:00 • 22:30 - 00:00 1.50 EVAL P OTHCMP LOG DOWN FROM 9000'MD -27'/MIN WITH 0.54/0.61 BPM IN/OUT -LOG DOWN TO 11,700'MD(MIDNIGHT) 3/25/2015 00:00 - 00:30 0.50 EVAL P OTHCMP CONTINUE LOG DOWN FROM 11,700'MD -27'/MIN WITH 0.54/0.61 BPM IN/OUT -TAG PBTD AT 12,463'UNCORRECTED Printed 4/6/2015 10:35:05AM North America-ALASKA-BP Page 7 of 10 Operation Summary Report Common Well Name:G-16 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/23/2015 End Date:3/26/2015 X3-016MH-C:(1,049,559.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM Rig Release:3/26/2015 Rig Contractor:NORDIC CALISTA UWI:500292064300 Active datum:ORKB©77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 00:30 - 03:30 3.00 EVAL P OTHCMP LOG UP FROM PBTD -19'/MIN WITH 0.53/0.42 BPM IN/OUT -LAY IN 100K LSRV PERF PILL INSIDE LINER -PAINT FLAGS FOR PBTD AND TOL -LOG UP TO 9050'MD 03:30 - 05:00 1.50 EVAL P OTHCMP POOH WITH LOGGING ASSEMLBY -FLOW CHECK ABOVE TOL,NO FLOW SWAP WELL TO CLEAN KCL ABOVE TOL -100'/MIN WITH 0.82/0.44 BPM -FLOW CHECK AT SURFACE,NO FLOW 05:00 - 08:00 3.00 EVAL P OTHCMP PJSM AND LD LOGGING ASSEMBLY -POP OFF,SET INJECTOR ON LEGS -LD RUNNING TOOLS AND 4 JTS 2-1/16"CSH -LD 6 JTS 1"CSH(#99-104) STAND BACK REMAINING 98 JTS 1"CSH -FILL HOLE EVERY 30 JTS -BREAK OUT AND LAY DOWN MEMORY LOGGING TOOLS 08:00 - 09:30 1.50 PERF I P OTHCMP PERFORM LINER LAP TEST. -INSTALL NIGHT CAP AND TEST. -PRESSURE UP WELL THRU KILL LINE WITH 8.4 SLICK 1%KCL. PRESSURED UP TO 1130 PSI THEN WELL STARTED TAKING FLUID. -ESTABLISHED INJECTIVITY AT.73 BBLS/MIN AT 1130 PSI. -HELD FOR 5 MINUTES.TOTAL OF 4 BBLS PUMPED IN. -RELEASE PRESSURE FROM WELL-2 BBLS BLED BACK. -LINER LAP TEST FAILED. 09:30 - 12:30 3.00 PERF P OTHCMP MAKE UP AND RIH WITH PERF GUNS. -VERIFIED PERF GUN LAY OUT WITH TCP AND WSL. -PJSM WITH TCP,NORDIC AND SLB CT PERSONNEL. -MAKE UP AND RUN IN HOLE WITH PERF GUNS AS PER PER GUN MEMO. -RUN IN HOLE WITH 1"CSH PIPE FROM DERRICK. -MAKE UP AND RUN IN HOLE WITH REMAINING BHA. -MAKE UP CTC AND STAB ON INJECTOR. -PT QTS. 12:30 - 15:15 2.75 PERF P OTHCMP RUN IN HOLE ON COIL WITH PERF GUNS. -RUN IN HOLE AT 40 FPM. -VERIFY DEPTH AT WINDOW FLAG-+4' DIFFERENCE -STOP AT PBTD FLAG.MADE-2' CORRECTION. *FIRE DRILL WITH DAYLIGHT CREW-ALL HANDS RESPONDED-GOOD AAR. 15:15 - 16:00 0.75 PERF P OTHCMP PERFORATE ON DEPTH -TAGGED PBTD AT 12,463.8'WITH 2K WOB. -PICK UP AND GOT BREAKOVE AND PUWAT 35.5K. -RIH AND TAGGED AGAIN WITH 3K WOB. -PICK UP TO BREAK OVER WEIGHT+1'. PERFORMED FIRING SEQUENCE-GOOD INCIDATION ON PUMP RATE AND FIRING SENSOR OF GOOD FIRING. Printed 4/6/2015 10:35:05AM North America-ALASKA-BP Page 8 of 10 Operation Summary Report Common Well Name:G-16 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/23/2015 End Date:3/26/2015 X3-016MH-C:(1,049,559.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:OOAM Rig Release:3/26/2015 Rig Contractor:NORDIC CALISTA UW:500292064300 Active datum:ORKB @77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:00 - 19:30 3.50 PERF P OTHCMP APPLY 250 PSI OF PRESSURE ON WELLHEAD. POOH AT 22 FPM WHILE MONITORING WELLHEAD PRESSURE. -SLIGHT LOSSES WHILE POOH(ABOUT 3.5 BPH LOSSES WHILE POOH AND WITH 'WELLHEAD PRESSURE) -POOH TO 9268'.OPEN BAKER CHOKE AND BLEED WELLHEAD PRESSURE OFF. PERFORM 10 MINUTE FLOW CHECK-WELL STATIC POOH FROM 9268'TO SURFACE FLOWCHECK ON SURFACE,NO FLOW 19:30 - 23:00 3.50 PERF P OTHCMP PJSM AND LD PERFORATING BHA -POP OFF,SET INJECTOR ON LEGS LD 4 JTS 2-1/16"CSH -LD 98 JTS 1"CSH FILL HOLE EVERY 30 JTS 23:00 - 00:00 1.00 PERF P OTHCMP PJSM AND LD PERF GUNS LD E-FIRE HEAD AND 9 GUNS ALL SHOTS FIRED 3/26/2015 00:00 - 00:30 0.50 PERF P OTHCMP CLEAN AND CLEAR RIG FLOOR RD POWER TONGS,LITTLE JERKS SPINNERS,1"CSH ELEVATOR -CLEAR RIG FLOOR AND PERFORATOR EQUIPMENT 00:30 - 01:00 0.50 WHSUR N SFAL POST RE-MAKE UP BTT EXTERNAL SLIP CTC -ATTEMPT TO MU NOZZLE FOR FREEZE PROTECT,FIND BAKER CTC LOOSE. -CALL BTT FOR RECOMENDATION. -RE-TIGHTEN BTT CTC. -PULL TEST TO 35K#,GOOD TEST -PRESS TEST TO 250/3500 PSI,GOOD TEST 01:00 - 02:00 1.00 WHSUR P POST PJSM AND MAKE UP NOZZLE MU NOZZLE WITH DUAL BPVAND STINGER -GET ON WELL,PRESS TEST OTS 02:00 - 03:00 1.00 WHSUR P POST PJSM AND FREEZE PROTECT WELL TO 2600' MD -RIH CIRC DIESEL TO NOZZLE -RIH 100'/MIN WITH 1.80/2.20 BPM IN/OUT —POOH LAYING IN 40 BBLS 90F DIESEL -POOH 100'/MIN WITH 1.61/1.22 BPM IN/OUT -TAKE KCL RETURNS TO TIGER TANK -TAG UP ON SURFACE,CLOSE SWAB 03:00 - 03:30 0.50 WHSUR P POST RIG UP TO BLOW DOWN REEL -SPOT N2 UNIT AND RU HARDLINE. -BLOW DOWN TIGER TANK LINE AND SUCK OUT TIGER TANK. -LOAD FRESH WATER INTO PITS. 03:30 - 05:30 2.00 WHSUR N SFAL POST PJSM AND BLOW DOWN REEL -RIG UP AND COOL DOWN N2 UNIT. PRESS TEST TO 500/4000 PSI FOR 5/5 MIN. -WSL PERFORM PRESSURE CROSSCHECK CHECKLIST. WSL WITNESS TRIPS FUNTION DURING PRESS TEST. -DIFFICULTY IN GETTING FLATLINED PRESSURE TESTS DUE TO THERMAL EXPANSION. Printed 4/6/2015 10:35:05AM North America-ALASKA-BP Page 9 of 10 Operation Summary Report Common Well Name:G-16 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/23/2015 End Date:3/26/2015 X3-016MH-C:(1,049,559.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM Rig Release:3/26/2015 Rig Contractor:NORDIC CALISTA I UWI:500292064300 Active datum:ORKB @77.08usft(above Mean Sea Level) Date From-To Hrs , Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:30 - 07:00 1.50 WHSUR P POST PUMP 35 BBLS WATER,15 BBLS WATER WITH CORROSION INHIBITOR,10 BBLS NEAT MEOH. -BLOW DOWN REEL WITH N2,1800 SCF. -TAKE ALL RETURNS TO TIGER TANK 07:00 - 07:45 0.75 WHSUR P POST RIG DOWN NITROGEN UNIT. -POP OFF INJECTOR INSTALL NIGHT CAP TEST NIGHT CAP -OPEN WELL UP TO NIGHT CAP-WELL ON SLIGHT VACUUM. '07:45 - 09:00 1.25 WHSUR P . POST -GREASE TREE VALVES. -INSTALL TWC. -FILL TREE WITH METHANOL. -LEAK TITE TEST TREE-GOOD TEST. 09:00 - 11:30 2.50 WHSUR P POST PULL COIL BACK INTO REEL HOUSE. -RIG UP AND INSTALL GRAPPLE ON END OF COIL -PULL TEST GRAPPLE -PULL COIL BACK INTO REEL HOUSE. SECURE COIL TO REEL WITH CLAMPS AND SHIPPING BAR. 11:30 - 12:00 0.50 WHSUR P - POST MEETING WITH BP MANAGEMENT 12:00 - 13:30 1.50 WHSUR P POST REMOVE PACKOFF FROM INJECTOR. SET BACK ON DRILLER'S SIDE OF RIG FLOOR AND SECURE PACKOFF TO INJECTOR. 13:30 - 16:30 3.00 BOPSUR P POST CHANGE OUT RAMS IN BOP STACK FOR NEXT WELL. -CHANGE OUT RAMS IN BOPE. I-SIMOPS:BREAK OUT HARD LINE FROM COIL REEL IN PREPARATION FOR SHIPPING. -REMOVE COIL REEL FROM HUBS. -LOWER COIL REEL TO TRUCK AND SECURE TO TRAILER FOR TRANSPORT 16:30 - 18:00 1.50 BOPSUR P POST NIPPLE DOWN BOP STACK SECURE STACK IN CELLAR FOR RIG MOVE SIMOPS: -RIG DOWN AND PREP FOR RIG MOVE. -LOAD TRAILERS FOR TRANSPORT TO t — D-PAD. 18:00 - 19:00 1.00 BOPSUR P POST NIPPLE UP TREE CAP SIMOPS: -MOVE WELDING SHOP AND PARTS TRAILER TO D-PAD -MOVE MINERAL OIL PUP,SCS TRAILER TO D-PAD - Printed 4/6/2015 10:35:05AM North America-ALASKA-BP Page 10 of 10 Operation Summary Report Common Well Name:G-16 AFE No Event Type:COM-ONSHORE(CON) Start Date:3/23/2015 End Date:3/26/2015 X3-016MH-C:(1,049,559.00) Project:Prudhoe Bay Site:PB G Pad Rig Name/No.:NORDIC 2 Spud Date/Time:9/24/1981 12:00:00AM Rig Release:3/26/2015 Rig Contractor NORDIC CALISTA UW:500292064300 Active datum:ORKB @77.08usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 21:00 2.00 BOPSUR P POST PRESS TEST TREE CAP TO 250/3500 PSI -WAIT 15 MIN FOR LOW PT TO STABILIZE, GOOD TEST -WAIT 60 MIN FOR HIGH PT TO STABILIZE, GOOD MIN '-BUMP UP HIGH PT 4 TIMES,NO VISIBLE LEAK PAST TREE CAP SIMOPS: -RD TIGER TANK HARDLINE MOVE TIGER TANK AND CUTTINGS BOX TO D-PAD RELEASE NORDIC 2 CTD RIG AND END COMPLETION EVENT AT 21:00 ON 03/26/2015. PREP RIG TO MOVE TO D-24A. ALL TREE AND WELLHEAD VALVE LEFT CLOSED WITH PRESSURE GAUGES. FINAL OA/IA PRESS=0/0 PSI. • TREE,WELLHEAD,AND CELLAR CLEAN. WELLWORK TRANSFER PERMIT CLOSED 'WITH PAD OPERATOR. WELL HANDOVER COMPLETED WITH WELLS •GROUP. Printed 4/6/2015 10:35:05AM by North America - ALASKA - BP Prudhoe Bay PB G Pad G-16 500292064300 G-16B Design: G-16B Survey Report - Geographic 26 March, 2015 BAKER HUGHES „' 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-16 Project: Prudhoe Bay TVD Reference: ORKB @ 77.08usft Site: PB G Pad MD Reference: ORKB @ 77.08usft • Well: G-16 North Reference: True Wellbore: G-16B Survey Calculation Method: Minimum Curvature • Design: G-16B Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) • System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB G Pad,TR-11-13 Site Position: Northing: 5,966,832.870 usft Latitude: 70°18'58.211 N From: Map Easting: 656,301.390 usft Longitude: 148°43'59.013 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.19 ° Well G-16 API No. 500292064300 Well Position +NI-S 0.00 usft Northing: 5,968,213.625 usft . Latitude: 70°19'11.596 N +EI-W 0.00 usft Easting: 657,241.328 usft . Longitude: 148°43'30.749 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: , 40.08 usft Wellbore G-16B API no. 500292064302 Magnetics Model Name Sample Date Declination Dip Angle Field Strength 1°1 (°) (nT) BGGM2014 3/16/2015 19.37 81.02 57,587 Design G-16B Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,300.00 Vertical Section: Depth From(ND) +NI-S +E/-W Direction (usft) (usft) (usft) (°) 37.00 0.00 0.00 222.24 Survey Program Date: 3/26/2015 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 9,300.00 1 :Sperry-Sun BOSS gyro multi(G-16) BOSS-GYRO Sperry-Sun BOSS gyro multishot 9,372.00 10,020.54 CoilTrak MWD(G-16B) MWD MWD-Standard 10,050.11 12,450.27 CoilTrak MWD+IFR(G-16B) MWD+IFR MWD+IFR correction 3/26/2015 1:25:10PM Page 2 COMPASS 5000.1 Build 61 Fr 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-16 Project: Prudhoe Bay TVD Reference: ORKB @ 77.08usft Site: PB G Pad MD Reference: ORKB @ 77.08usft Well: G-16 North Reference: True Wellbore: G-16B Survey Calculation Method: Minimum Curvature Design: G-16B Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 37.00 0.00 0.00 37.00 0.00 0.00 5,968,213.625 657,241.328 70°19'11.596 N 148°43'30.749 W 100.00 0.33 247.85 100.00 -0.07 -0.17 5,968,213.553 657,241.161 70°19'11.595 N 148°43'30.754 W 200.00 0.42 241.47 200.00 -0.35 -0.76 5,968,213.258 657,240.579 70°19'11.593 N 148°43'30.771 W 300.00 0.50 210.13 299.99 -0.90 -1.30 5,968,212.694 657,240.049 70°19'11.587 N 148°43'30.787 W 400.00 0.83 218.69 399.99 -1.85 -1.97 5,968,211.737 657,239.398 70°19'11.578 N 148°43'30.806 W 500.00 0.83 223.23 499.98 -2.94 -2.92 5,968,210.625 657,238.472 70°19'11.567 N 148°43'30.834 W 600.00 1.00 226.74 599.96 -4.07 -4.05 5,968,209.476 657,237.364 70°19'11.556 N 148°43'30.867 W 700.00 1.00 232.14 699.95 -5.20 -5.37 5,968,208.315 657,236.064 70°19'11.545 N 148°43'30.906 W 800.00 0.92 238.50 799.94 -6.15 -6.75 5,968,207.331 657,234.711 70°19'11.535 N 148°43'30.946 W 900.00 0.50 249.95 899.93 -6.72 -7.84 5,968,206.739 657,233.629 70°19'11.530 N 148°43'30.978 W 1,000.00 0.33 19.63 999.93 -6.60 -8.16 5,968,206.854 657,233.313 70°19'11.531 N 148°43'30.987 W 1,100.00 0.50 66.23 1,099.92 -6.15 -7.66 5,968,207.312 657,233.800 70°19'11.535 N 148°43'30.973 W 1,200.00 0.50 72.87 1,199.92 -5.85 -6.84 5,968,207.633 657,234.609 70°19'11.538 N 148°43'30.949 W 1,300.00 0.50 80.60 1,299.92 -5.65 -6.00 5,968,207.851 657,235.452 70°19'11.540 N 148°43'30.924 W 1,400.00 0.42 122.31 1,399.91 -5.78 -5.26 5,968,207.742 657,236.195 70°19'11.539 N 148°43'30.902 W 1,500.00 0.50 114.75 1,499.91 -6.15 -4.55 5,968,207.378 657,236.909 70°19'11.535 N 148°43'30.882 W 1,600.00 0.33 20.30 1,599.91 -6.07 -4.05 5,968,207.476 657,237.403 70°19'11.536 N 148°43'30.867 W 1,700.00 0.42 353.36 1,699.91 -5.43 -4.00 5,968,208.111 657,237.447 70°19'11.543 N 148°43'30.866 W 1,800.00 0.42 277.62 1,799.90 -5.02 -4.40 5,968,208.515 657,237.033 70°19'11.547 N 148°43'30.877 W 1,900.00 0.42 329.52 1,899.90 -4.66 -4.95 5,968,208.868 657,236.476 70°19'11.550 N 148°43'30.893 W 2,000.00 0.42 312.20 1,999.90 -4.09 -5.41 5,968,209.420 657,236.007 70°19'11.556 N 148°43'30.907 W 2,100.00 0.42 209.32 2,099.90 -4.17 -5.86 5,968,209.337 657,235.558 70°19'11.555 N 148°43'30.920 W 2,200.00 0.42 212.71 2,199.89 -4.79 -6.24 5,968,208.702 657,235.194 70°19'11.549 N 148°43'30.931 W 2,300.00 0.58 250.30 2,299.89 -5.27 -6.91 5,968,208.209 657,234.529 70°19'11.544 N 148°43'30.951 W 2,400.00 0.50 354.30 2,399.89 -5.01 -7.43 5,968,208.461 657,234.004 70°19'11.547 N 148°43'30.966 W 2,500.00 0.42 341.22 2,499.89 -4.23 -7.59 5,968,209.239 657,233.826 70°19'11.554 N 148°43'30.971 W 2,600.00 0.50 27.57 2,599.88 -3.49 -7.51 5,968,209.974 657,233.895 70°19'11.562 N 148°43'30.968 W 2,700.00 0.50 353.50 2,699.88 -2.67 -7.36 5,968,210.797 657,234.030 70°19'11.570 N 148°43'30.964 W 2,800.00 1.25 95.33 2,799.87 -2.34 -6.32 5,968,211.151 657,235.060 70°19'11.573 N 148°43'30.933 W 2,900.00 1.83 31.84 2,899.84 -1.09 -4.39 5,968,212.446 657,236.961 70°19'11.585 N 148°43'30.877 W 3,000.00 3.67 318.12 2,999.75 2.65 -5.69 5,968,216.159 657,235.589 70°19'11.622 N 148°43'30.915 W 3,100.00 4.42 316.41 3,099.50 7.83 -10.48 5,968,221.231 657,230.688 70°19'11.673 N 148°43'31.055 W 3,200.00 3.42 246.12 3,199.31 9.41 -15.87 5,968,222.702 657,225.270 70°19'11.689 N 148°43'31.212 W 3,300.00 5.00 201.72 3,299.06 4.15 -20.21 5,968,217.355 657,221.039 70°19'11.637 N 148°43'31.339 W 3,400.00 7.00 212.36 3,398.51 -5.04 -25.08 5,968,208.059 657,216.359 70°19'11.546 N 148°43'31.481 W 3,500.00 9.00 228.82 3,497.55 -15.34 -34.23 5,968,197.570 657,207.427 70°19'11.445 N 148°43'31.748 W 3,600.00 11.00 236.27 3,596.03 -25.79 -48.06 5,968,186.835 657,193.826 70°19'11.342 N 148°43'32.151 W 3,700.00 14.33 239.14 3,693.58 -37.44 -66.62 5,968,174.800 657,175.512 70°19'11.228 N 148°43'32.693 W 3,800.00 17.00 240.10 3,789.86 -51.08 -89.92 5,968,160.679 657,152.505 70°19'11.094 N 148°43'33.373 W 3,900.00 18.92 241.78 3,884.98 -66.03 -116.88 5,968,145.164 657,125.865 70°19'10.947 N 148°43'34.160 W 4,000.00 21.50 243.71 3,978.82 -81.82 -147.60 5,968,128.739 657,095.484 70°19'10.791 N 148°43'35.056 W 4,100.00 23.50 243.50 4,071.20 -98.83 -181.88 5,968,111.012 657,061.575 70°19'10.624 N 148°43'36.056 W 4,200.00 25.00 243.17 4,162.38 -117.27 -218.58 5,968,091.814 657,025.270 70°19'10.443 N 148°43'37.127 W 4,300.00 27.33 242.84 4,252.12 -137.29 -257.86 5,968,070.978 656,986.415 70°19'10.246 N 148°43'38.274 W 4,400.00 29.67 243.64 4,340.00 -158.76 -300.47 5,968,048.621 656,944.270 70°19'10.035 N 148°43'39.517 W 4,500.00 33.50 241.34 4,425.17 -182.99 -346.88 5,968,023.421 656,898.380 70°19'9.796 N 148°43'40.871 W 4,600.00 37.42 244.88 4,506.62 -209.14 -398.63 5,967,996.198 656,847.192 70°19'9.539 N 148°43'42.381 W 4,700.00 39.67 249.53 4,584.84 -233.21 -456.06 5,967,970.933 656,790.281 70°19'9.302 N 148°43'44.057 W 4,800.00 40.50 252.42 4,661.36 -254.18 -516.93 5,967,948.692 656,729.873 70°19'9.096 N 148°43'45.833 W 4,900.00 41.50 254.38 4,736.83 -272.91 -579.80 5,967,928.650 656,667.417 70°19'8.912 N 148°43'47.668 W 5,000.00 42.83 257.97 4,810.96 -288.92 -644.96 5,967,911.282 656,602.606 70°19'8.754 N 148°43'49.569 W 5,100.00 43.75 258.24 4,883.75 -303.05 -712.06 5,967,895.748 656,535.826 70°19'8.615 N 148°43'51.527 W 5,200.00 41.50 258.40 4,957.32 -316.76 -778.37 5,967,880.653 656,469.819 70°19'8.480 N 148°43'53.462 W 5,300.00 41.00 259.40 5,032.51 -329.46 -843.07 5,967,866.605 656,405.406 70°19'8.355 N 148°43'55.350 W 5,400.00 40.25 260.48 5,108.41 -340.83 -907.18 5,967,853.888 656,341.556 70°19'8.243 N 148°43'57.220 W 3/26/2015 1:25:10PM Page 3 COMPASS 5000.1 Build 61 Ira- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-16 Project: Prudhoe Bay TVD Reference: ORKB @ 77.08usft Site: PB G Pad MD Reference: ORKB @ 77.08usft Well: G-16 North Reference: True Wellbore: G-16B Survey Calculation Method: Minimum Curvature Design: G-16B Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 5,500.00 40.33 262.60 5,184.69 -350.35 -971.13 5,967,843.039 656,277.820 70°19'8.150 N 148°43'59.086 W 5,600.00 39.83 263.46 5,261.20 -358.16 -1,035.04 5,967,833.887 656,214.094 70°19'8.073 N 148°44'0.951 W 5,700.00 41.00 260.45 5,337.35 -367.25 -1,099.21 5,967,823.455 656,150.129 70°19'7.983 N 148°44'2.824 W 5,800.00 40.83 249.94 5,413.01 -383.93 -1,162.34 5,967,805.462 656,087.365 70°19'7.819 N 148°44'4.666 W 5,900.00 39.25 240.47 5,489.63 -410.76 -1,220.64 5,967,777.416 656,029.652 70°19'7.555 N 148°44'6.367 W 6,000.00 38.42 231.10 5,567.60 -445.89 -1,272.39 5,967,741.207 655,978.651 70°19'7.210 N 148°44'7.877 W 6,100.00 39.17 229.52 5,645.54 -485.91 -1,320.59 5,967,700.194 655,931.299 70°19'6.816 N 148°44'9.283 W 6,200.00 39.25 228.90 5,723.02 -527.21 -1,368.45 5,967,657.905 655,884.317 70°19'6.410 N 148°44'10.679 W 6,300.00 39.00 230.57 5,800.60 -567.99 -1,416.60 5,967,616.126 655,837.040 70°19'6.009 N 148°44'12.084 W 6,400.00 38.83 230.95 5,878.41 -607.73 -1,465.25 5,967,575.382 655,789.235 70°19'5.618 N 148°44'13.503 W 6,500.00 38.83 230.25 5,956.31 -647.52 -1,513.70 5,967,534.581 655,741.632 70°19'5.226 N 148°44'14.917 W 6,600.00 38.92 230.99 6,034.16 -687.34 -1,562.21 5,967,493.757 655,693.969 70°19'4.834 N 148°44'16.332 W 6,700.00 38.50 231.58 6,112.19 -726.46 -1,611.01 5,967,453.632 655,646.007 70°19'4.450 N 148°44'17.756 W 6,800.00 30.00 230.99 6,194.78 -761.60 -1,654.90 5,967,417.579 655,602.864 70°19'4.104 N 148°44'19.036 W 6,900.00 37.50 231.34 6,277.87 -796.40 -1,698.16 5,967,381.883 655,560.349 70°19'3.762 N 148°44'20.298 W 7,000.00 36.92 231.27 6,357.51 -834.21 -1,745.35 5,967,343.099 655,513.956 70°19'3.390 N 148°44'21.675 W 7,100.00 35.67 235.26 6,438.12 -869.62 -1,792.75 5,967,306.704 655,467.314 70°19'3.041 N 148°44'23.058 W 7,200.00 34.92 235.60 6,519.73 -902.41 -1,840.33 5,967,272.931 655,420.439 70°19'2.719 N 148°44'24.446 W 7,300.00 34.00 234.14 6,602.19 -934.96 -1,886.61 5,967,239.421 655,374.857 70°19'2.398 N 148°44'25.796 W 7,400.00 33.17 235.72 6,685.49 -966.75 -1,931.87 5,967,206.694 655,330.270 70°19'2.086 N 148°44'27.116 W 7,500.00 32.42 236.32 6,769.56 -997.02 -1,976.78 5,967,175.488 655,286.006 70°19'1.788 N 148°44'28.426 W 7,600.00 31.67 237.67 6,854.32 -1,025.92 -2,021.27 5,967,145.659 655,242.134 70°19'1.503 N 148°44'29.724 W 7,700.00 30.83 232.26 6,939.83 -1,055.65 -2,063.73 5,967,115.049 655,200.314 70°19'1.211 N 148°44'30.963 W 7,800.00 29.75 232.16 7,026.17 -1,086.56 -2,103.59 5,967,083.317 655,161.115 70°19'0.907 N 148°44'32.125 W 7,900.00 28.75 233.20 7,113.42 -1,116.19 -2,142.44 5,967,052.884 655,122.894 70°19'0.615 N 148°44'33.259 W 8,000.00 27.75 232.63 7,201.51 -1,144.73 -2,180.20 5,967,023.564 655,085.743 70°19'0.335 N 148°44'34.360 W 8,100.00 27.00 231.84 7,290.31 -1,172.88 -2,216.55 5,966,994.655 655,049.992 70°19'0.058 N 148°44'35.421 W 1 8,200.00 26.58 233.10 7,379.58 -1,200.34 -2,252.29 5,966,966.456 655,014.838 70°18'59.787 N 148°44'36.463 W 8,300.00 25.75 233.79 7,469.33 -1,226.61 -2,287.71 5,966,939.456 654,979.981 70°18'59.529 N 148°44'37.496 W 8,400.00 25.42 236.35 7,559.53 -1,251.33 -2,323.10 5,966,913.996 654,945.115 70°18'59.286 N 148°44'38.529 W 8,500.00 25.17 237.22 7,649.94 -1,274.74 -2,358.85 5,966,889.848 654,909.870 70°18'59.055 N 148°44'39.571 W 8,600.00 25.50 240.45 7,740.33 -1,296.87 -2,395.45 5,966,866.957 654,873.738 70°18'58.838 N 148°44'40.639 W 8,700.00 25.33 241.72 7,830.65 -1,317.62 -2,433.02 5,966,845.425 654,836.619 70°18'58.633 N 148°44'41.735 W 8,800.00 25.33 242.72 7,921.04 -1,337.56 -2,470.87 5,966,824.698 654,799.197 70°18'58.437 N 148°44'42.839 W 8,900.00 25.00 245.63 8,011.55 -1,356.08 -2,509.13 5,966,805.377 654,761.334 70°18'58.255 N 148°44'43.955 W 9,000.00 24.33 251.80 8,102.44 -1,371.24 -2,547.96 5,966,789.413 654,722.839 70°18'58.106 N 148°44'45.088 W 9,100.00 23.33 255.57 8,193.92 -1,382.61 -2,586.70 5,966,777.235 654,684.340 70°18'57.994 N 148°44'46.218 W 9,200.00 22.42 257.68 8,286.05 -1,391.61 -2,624.51 5,966,767.442 654,646.731 70°18'57.905 N 148°44'47.321 W 9,300.00 21.75 261.72 8,378.72 -1,398.35 -2,661.48 5,966,759.932 654,609.915 70°18'57.839 N 148°44'48.400 W TIP 9,372.00 20.67 263.54 8,445.84 -1,401.70 -2,687.31 5,966,756.041 654,584.164 70°18'57.806 N 148°44'49.153 W KOP 9,390.04 14.42 263.54 8,463.04 -1,402.31 -2,692.71 5,966,755.316 654,578.777 70°18'57.800 N 148°44'49.311 W Interpolated Azimuth 9,420.07 13.99 278.00 8,492.16 -1,402.23 -2,700.02 5,966,755.248 654,571.465 70°18'57.800 N 148°44'49.524 W Interpolated Azimuth 9,450.07 12.38 287.69 8,521.37 -1,400.75 -2,706.68 5,966,756.590 654,564.780 70°18'57.815 N 148°44'49.719 W 9,480.06 11.57 263.97 8,550.72 -1,400.08 -2,712.74 5,966,757.124 654,558.710 70°18'57.821 N 148°44'49.895 W 9,510.08 12.11 255.30 8,580.11 -1,401.20 -2,718.78 5,966,755.883 654,552.695 70°18'57.810 N 148°44'50.072 W 9,540.08 16.53 248.74 8,609.17 -1,403.55 -2,725.80 5,966,753.389 654,545.721 70°18'57.787 N 148°44'50.276 W 9,569.97 21.21 256.47 8,637.45 -1,406.36 -2,735.03 5,966,750.388 654,536.557 70°18'57.760 N 148°44'50.546 W 9,636.66 16.53 241.07 8,700.58 -1,413.78 -2,755.08 5,966,742.549 654,516.662 70°18'57.687 N 148°44'51.131 W 9,660.03 15.04 229.17 8,723.07 -1,417.37 -2,760.29 5,966,738.849 654,511.533 70°18'57.651 N 148°44'51.283 W 9,690.21 15.88 216.79 8,752.17 -1,423.24 -2,765.73 5,966,732.869 654,506.220 70°18'57.594 N 148°44'51.441 W 9,720.20 19.95 215.19 8,780.70 -1,430.71 -2,771.13 5,966,725.287 654,500.970 70°18'57.520 N 148°44'51.599 W 3/26/2015 1:25:10PM Page 4 COMPASS 5000.1 Build 61 VC- 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-16 Project: Prudhoe Bay TVD Reference: ORKB @ 77.08usft Site: PB G Pad MD Reference: ORKB @ 77.08usft Well: G-16 North Reference: True Wellbore: G-16B Survey Calculation Method: Minimum Curvature Design: G-16B Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +El-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,752.06 24.03 210.23 8,810.24 -1,440.76 -2,777.54 5,966,715.104 654,494.781 70°18'57.421 N 148°44'51.785 W 9,781.89 28.43 208.21 8,836.99 -1,452.27 -2,783.95 5,966,703.462 654,488.606 70°18'57.308 N 148°44'51.973 W 9,810.53 32.85 207.32 8,861.62 -1,465.19 -2,790.75 5,966,690.408 654,482.088 70°18'57.181 N 148°44'52.171 W 9,845.60 37.34 204.18 8,890.31 -1,483.35 -2,799.47 5,966,672.066 654,473.744 70°18'57.002 N 148°44'52.425 W 9,872.00 41.54 202.80 8,910.70 -1,498.73 -2,806.15 5,966,656.551 654,467.393 70°18'56.851 N 148°44'52.620 W 9,900.60 45.92 201.55 8,931.36 -1,517.04 -2,813.60 5,966,638.094 654,460.327 70°18'56.671 N 148°44'52.837 W 9,930.48 50.38 201.11 8,951.29 -1,537.76 -2,821.69 5,966,617.202 654,452.672 70°18'56.467 N 148°44'53.073 W 9,962.80 55.39 200.16 8,970.79 -1,561.88 -2,830.76 5,966,592.905 654,444.107 70°18'56.230 N 148°44'53.337 W 9,990.60 60.05 200.17 8,985.63 -1,583.93 -2,838.86 5,966,570.685 654,436.472 70°18'56.013 N 148°44'53.573 W 10,020.54 64.88 199.13 8,999.47 -1,608.93 -2,847.78 5,966,545.509 654,428.078 70°18'55.767 N 148°44'53.833 W 10,050.11 69.61 197.25 9,010.90 -1,634.83 -2,856.28 5,966,519.439 654,420.121 70°18'55.512 N 148°44'54.081 W 10,082.79 74.50 193.18 9,020.97 -1,664.82 -2,864.42 5,966,489.290 654,412.611 70°18'55.217 N 148°44'54.318 W 10,110.27 77.16 187.80 9,027.70 -1,691.01 -2,869.27 5,966,463.009 654,408.320 70°18'54.960 N 148°44'54.459 W 10,140.33 79.88 182.32 9,033.69 -1,720.33 -2,871.86 5,966,433.634 654,406.345 70°18'54.671 N 148°44'54.534 W 10,170.32 84.46 177.47 9,037.78 -1,750.03 -2,871.79 5,966,403.951 654,407.028 70°18'54.379 N 148°44'54.532 W 10,200.30 86.31 181.11 9,040.19 -1,779.90 -2,871.43 5,966,374.093 654,408.023 70°18'54.085 N 148°44'54.521 W 10,231.59 89.94 185.64 9,041.21 -1,811.11 -2,873.27 5,966,342.858' 654,406.836 70°18'53.778 N 148°44'54.574 W 10,260.26 91.32 189.45 9,040.90 -1,839.52 -2,877.03 5,966,314.373 654,403.669 70°18'53.499 N 148°44'54.684 W 10,290.49 91.44 194.30 9,040.17 -1,869.09 -2,883.25 5,966,284.686 654,398.073 70°18'53.208 N 148°44'54.865 W 10,320.45 91.84 188.95 9,039.31 -1,898.41 -2,889.28 5,966,255.245 654,392.656 70°18'52.920 N 148°44'55.041 W 10,350.27 94.67 184.19 9,037.62 -1,927.97 -2,892.69 5,966,225.618 654,389.870 70°18'52.629 N 148°44'55.140 W 10,380.72 89.82 178.13 9,036.42 -1,958.37 -2,893.30 5,966,195.217 654,389.894 70°18'52.330 N 148°44'55.157 W 10,410.69 88.07 172.39 9,036.98 -1,988.22 -2,890.83 5,966,165.429 654,392.993 70°18'52.036 N 148°44'55.085 W 10,431.03 88.31 168.23 9,037.62 -2,008.26 -2,887.40 5,966,145.471 654,396.833 70°18'51.839 N 148°44'54.985 W 10,460.91 91.38 166.73 9,037.70 -2,037.42 -2,880.93 5,966,116.450 654,403.918 70°18'51.553 N 148°44'54.795 W 10,490.77 94.89 166.06 9,036.07 -2,066.40 -2,873.92 5,966,087.631 654,411.535 70°18'51.268 N 148°44'54.590 W 10,520.79 94.49 170.27 9,033.61 -2,095.67 -2,867.78 5,966,058.491 654,418.281 70°18'50.980 N 148°44'54.411 W 10,551.26 94.64 173.11 9,031.19 -2,125.72 -2,863.39 5,966,028.541 654,423.299 70°18'50.684 N 148°44'54.283 W 10,587.81 90.74 169.16 9,029.47 -2,161.78 -2,857.77 5,965,992.610 654,429.679 70°18'50.330 N 148°44'54.118 W 10,611.12 92.73 165.49 9,028.76 -2,184.51 -2,852.65 5,965,969.997 654,435.264 70°18'50.106 N 148°44'53.969 W 10,640.61 93.97 159.82 9,027.04 -2,212.60 -2,843.88 5,965,942.100 654,444.622 70°18'49.830 N 148°44'53.713 W 10,670.88 90.28 157.31 9,025.92 -2,240.75 -2,832.83 5,965,914.190 654,456.261 70°18'49.553 N 148°44'53.390 W 10,700.93 90.74 156.60 9,025.65 -2,268.40 -2,821.07 5,965,886.794 654,468.599 70°18'49.281 N 148°44'53.046 W 10,731.07 90.83 151.38 9,025.24 -2,295.47 -2,807.86 5,965,860.003 654,482.374 70°18'49.015 N 148°44'52.661 W 10,760.85 91.35 153.39 9,024.67 -2,321.85 -2,794.06 5,965,833.919 654,496.723 70°18'48.756 N 148°44'52.258 W 10,791.01 94.05 158.50 9,023.25 -2,349.35 -2,781.78 5,965,806.686 654,509.572 70°18'48.485 N 148°44'51.899 W 10,820.79 92.12 162.68 9,021.64 -2,377.39 -2,771.90 5,965,778.862 654,520.035 70°18'48.209 N 148°44'51.611 W 10,850.87 93.13 168.46 9,020.27 -2,406.48 -2,764.42 5,965,749.939 654,528.127 70°18'47.923 N 148°44'51.392 W 10,880.81 90.80 172.85 9,019.24 -2,436.00 -2,759.56 5,965,720.533 654,533.601 70°18'47.633 N 148°44'51.250 W 10,911.10 90.34 178.32 9,018.94 -2,466.18 -2,757.23 5,965,690.404 654,536.563 70°18'47.336 N 148°44'51.182 W 10,941.11 89.75 179.03 9,018.91 -2,496.18 -2,756.53 5,965,660.426 654,537.885 70°18'47.041 N 148°44'51.161 W 10,970.70 88.25 175.08 9,019.43 -2,525.72 -2,755.02 5,965,630.926 654,540.023 70°18'46.751 N 148°44'51.117 W 11,000.71 88.92 170.30 9,020.17 -2,555.47 -2,751.20 5,965,601.267 654,544.461 70°18'46.458 N 148°44'51.005 W 11,029.37 87.58 166.53 9,021.05 -2,583.53 -2,745.45 5,965,573.338 654,550.799 70°18'46.182 N 148°44'50.837 W 11,060.64 84.80 163.54 9,023.13 -2,613.67 -2,737.39 5,965,543.379 654,559.481 70°18'45.886 N 148°44'50.602 W 11,090.64 83.35 159.09 9,026.22 -2,641.93 -2,727.84 5,965,515.328 654,569.626 70°18'45.608 N 148°44'50.323 W 11,120.88 88.99 154.18 9,028.24 -2,669.60 -2,715.88 5,965,487.910 654,582.164 70°18'45.336 N 148°44'49.973 W 11,150.63 85.85 151.41 9,029.58 -2,696.03 -2,702.29 5,965,461.775 654,596.297 70°18'45.076 N 148°44'49.577 W 11,181.03 84.28 147.04 9,032.20 -2,722.05 -2,686.80 5,965,436.091 654,612.329 70°18'44.820 N 148°44'49.125 W 11,210.85 86.62 142.45 9,034.57 -2,746.31 -2,669.65 5,965,412.193 654,629.986 70°18'44.582 N 148°44'48.624 W 11,250.89 90.92 136.29 9,035.43 -2,776.67 -2,643.60 5,965,382.390 654,656.664 70°18'44.283 N 148°44'47.864 W 11,281.46 90.37 132.75 9,035.08 -2,798.10 -2,621.81 5,965,361.423 654,678.898 70°18'44.072 N 148°44'47.228 W 11,310.85 88.83 129.37 9,035.29 -2,817.40 -2,599.65 5,965,342.592 654,701.452 70°18'43.883 N 148°44'46.582 W 11,341.63 91.53 126.20 9,035.19 -2,836.25 -2,575.33 5,965,324.252 654,726.161 70°18'43.697 N 148°44'45.872 W 11,370.57 90.86 129.70 9,034.59 -2,854.04 -2,552.52 5,965,306.945 654,749.339 70°18'43.522 N 148°44'45.206 W 3/26/2015 1:25:10PM Page 5 COMPASS 5000.1 Build 61 Fr 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-16 Project: Prudhoe Bay TVD Reference: ORKB @ 77.08usft Site: PB G Pad MD Reference: ORKB @ 77.08usft Well: G-16 North Reference: True Wellbore: G-16B Survey Calculation Method: Minimum Curvature Design: G-16B Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E1-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 11,400.68 89.23 133.28 9,034.56 -2,873.99 -2,529.97 5,965,287.479 654,772.300 70°18'43.326 N 148°44'44.548 W 11,431.14 91.05 140.14 9,034.49 -2,896.14 -2,509.09 5,965,265.766 654,793.631 70°18'43.108 N 148°44'43.939 W 11,460.79 89.08 144.32 9,034.45 -2,919.58 -2,490.94 5,965,242.721 654,812.272 70°18'42.878 N 148°44'43.409 W 11,490.37 89.97 148.99 9,034.70 -2,944.28 -2,474.69 5,965,218.367 654,829.039 70°18'42.635 N 148°44'42.935 W 11,520.33 90.80 153.28 9,034.50 -2,970.51 -2,460.23 5,965,192.446 654,844.043 70°18'42.377 N 148°44'42.513 W 11,550.94 91.56 157.13 9,033.87 -2,998.29 -2,447.39 5,965,164.946 654,857.453 70°18'42.104 N 148°44'42.138 W 11,580.37 91.47 161.06 9,033.09 -3,025.76 -2,436.90 5,965,137.697 654,868.521 70°18'41.834 N 148°44'41.832 W 11,609.75 92.21 161.97 9,032.15 -3,053.61 -2,427.59 5,965,110.050 654,878.412 70°18'41.560 N 148°44'41.560 W 11,640.05 91.47 160.71 9,031.17 -3,082.30 -2,417.90 5,965,081.570 654,888.700 70°18'41.278 N 148°44'41.277 W 11,670.21 93.53 156.01 9,029.86 -3,110.30 -2,406.79 5,965,053.812 654,900.390 70°18'41.003 N 148°44'40.953 W 11,700.33 95.29 153.43 9,027.54 -3,137.45 -2,393.97 5,965,026.937 654,913.777 70°18'40.736 N 148°44'40.579 W 11,730.53 95.10 149.48 9,024.81 -3,163.87 -2,379.60 5,965,000.831 654,928.695 70°18'40.476 N 148°44'40.159 W 11,760.44 94.27 145.92 9,022.36 -3,189.06 -2,363.67 5,964,975.979 654,945.145 70°18'40.228 N 148°44'39.695 W 11,790.26 92.67 142.61 9,020.56 -3,213.22 -2,346.29 5,964,952.194 654,963.028 70°18'39.991 N 148°44'39.187 W 11,820.45 91.87 138.36 9,019.36 -3,236.49 -2,327.10 5,964,929.336 654,982.699 70°18'39.762 N 148°44'38.627 W 11,850.45 92.24 135.03 9,018.28 -3,258.30 -2,306.54 5,964,907.959 655,003.710 70°18'39.547 N 148°44'38.028 W 11,880.35 91.07 131.52 9,017.42 -3,278.78 -2,284.79 5,964,887.937 655,025.890 70°18'39.346 N 148°44'37.393 W 11,910.30 89.94 128.79 9,017.16 -3,298.09 -2,261.90 5,964,869.111 655,049.175 70°18'39.156 N 148°44'36.725 W 11,941.54 89.20 124.64 9,017.39 -3,316.77 -2,238.86 5,964,850.969 655,074.595 70°18'38.973 N 148°44'35.995 W 11,970.41 89.88 120.57 9,017.62 -3,332.32 -2,212.55 5,964,835.931 655,099.228 70°18'38.820 N 148°44'35.285 W 12,000.21 88.86 117.54 9,017.95 -3,346.79 -2,186.50 5,964,822.011 655,125.568 70°18'38.677 N 148°44'34.525 W 12,030.81 88.68 114.45 9,018.61 -3,360.20 -2,159.01 5,964,809.183 655,153.336 70°18'38.546 N 148°44'33.723 W 12,060.47 88.83 111.16 9,019.25 -3,371.69 -2,131.68 5,964,798.268 655,180.900 70°18'38.433 N 148°44'32.926 W 12,090.32 88.13 107.79 9,020.04 -3,381.63 -2,103.55 5,964,788.913 655,209.228 70°18'38.335 N 148°44'32.105 W 12,120.41 87.21 104.54 9,021.27 -3,390.00 -2,074.68 5,964,781.151 655,238.267 70°18'38.253 N 148°44'31.263 W 12,150.32 88.80 102.66 9,022.31 -3,397.03 -2,045.63 5,964,774.733 655,267.457 70°18'38.184 N 148°44'30.416 W 12,180.33 91.10 98.86 9,022.34 -3,402.63 -2,016.15 5,964,769.751 655,297.041 70°18'38.129 N 148°44'29.556 W 12,210.36 90.28 93.65 9,021.97 -3,405.90 -1,986.31 5,964,767.107 655,326.940 70°18'38.097 N 148°44'28.686 W 12,240.47 93.04 97.56 9,021.10 -3,408.84 -1,956.37 5,964,764.797 655,356.937 70°18'38.068 N 148°44'27.812 W 12,270.42 93.10 102.10 9,019.50 -3,413.95 -1,926.91 5,964,760.311 655,386.496 70°18'38.018 N 148°44'26.953 W 12,300.57 91.11 106.36 9,018.39 -3,421.35 -1,897.71 5,964,753.520 655,415.839 70°18'37.945 N 148°44'26.101 W 12,330.39 91.38 111.21 9,017.74 -3,430.95 -1,869.49 5,964,744.516 655,444.248 70°18'37.851 N 148°44'25.278 W 12,361.09 91.47 116.72 9,016.98 -3,443.41 -1,841.46 5,964,732.646 655,472.535 70°18'37.728 N 148°44'24.460 W 12,390.36 91.01 120.68 9,016.34 -3,457.46 -1,815.80 5,964,719.137 655,498.485 70°18'37.590 N 148°44'23.712 W 12,420.61 90.77 125.89 9,015.87 -3,474.05 -1,790.52 5,964,703.078 655,524.101 70°18'37.427 N 148°44'22.974 W 12,450.27 92.30 128.76 9,015.08 -3,492.03 -1,766.95 5,964,685.602 655,548.045 70°18'37.250 N 148°44'22.287 W 12,502.00 , 92.30 128.76 9,013.00 • -3,524.39 -1,726.64 5,964,654.096 655,589.016 70°18'36.932 N 148°44'21.111 W Projection to TD 3/26/2015 1:25:10PM Page 6 COMPASS 5000.1 Build 61 N p O L N r) m a) CO C O) N co a J C - f0 a Lo U C a) CC I c E n E oN W W O O N _ H U N O) WD f` M C d i O co a) O -o a• N O) CO w u) O O r ri C , <ma ❑ W U 0 U U d (i u x ox O Ox m N O J . Y N S 3 Y2 N N ?-2 a 0 J M "w N uo N J N 0 o 0 o o 0 n R JJ a 0a 2 NN 0 0 0 0 0 0 NOoOO O cn > lig CO � O U D O O O N O OX N N 2 m • Ln a1 N U N W L 0 W C p N .N 2 .y N E a) ai .— N .1- C x c u n E o o o w ELN c d �_ U o a) E o d = ( U c o c m o 2 0- c r ❑ Z m ai o N a j W O E a) a s X d• 2 m — o Ice U) a as }g g } d G`i 8 i 0 a a .c O a0 c U a u) CC cE ` ic o) J a o 2 a) e�E en a U n o o a a in o E ▪ U U) J O t7 } H H N V N l[) O 1.11 OO N co) _c N O N N 6 .c- CD W N r) E O a) N a a c� d . 2 O Um m (.n y a7 ¢O n > a L 0 N J O yE . — CA (n C i a 2 fn O L r- U) O I W 2 c O E iii co > n a ce y ..i.-.. s N u� d 3 w 15 2 ca) a) z' o d E E w @ C o c co o 0 w w in a -??o U ~ , m rn I v o m a) _= 0 LL o iii d v c a iu a ❑ a E- _ oo v'i ' Q E m7 Eo goO < n LV r@ -O n C U G v o Q D ) L_ Z � cc of N Z Ce o u) 76 f 1] d O0 r) O .o �" U N ' a) r) .2 N O d f7 p E O^ (n U M T co V O O.a OD Z O iv: a) ' a) 0 V Gu N Go a E 6 a) co al E d ❑ of d a) c LL m ' c Z > U in A rn - in u) x Q o _ ,n C N u .O a) o E a) N > T _O o Et Eco C C H F 3 U a) > > . o 5 W0 I- a m x a' o a) a) g < 0 m 1 le 0 O U 5 H ❑ 0 8 ceu) O Z JO oL LI o W ❑ a m n co a a CO a 3 E a a 0 0 0 LJL a a) L.L. a w a Et Z co W J Z Y ao M(7 Z Lu (N Luce O NO ZOm 17- 2 7 WO .0 Z r -Tr co 0 JWCC a) N ❑ a O a O o uu) x) U a z w w a c? row CJ) i = to a F U a s- CO Y a) o C7 u) U Z' m Z E Y o. o Zca ui m co m O O O E w 2 Z : E "- a N E m p 2 >-• .. m a) w H m rn m y'th a v a crn E U d Z L O U o a TD a U Z N E o o m ai a T 0 No 0 7, i E a _ii 2 a) o E• avi c n d aci Z �� w = > T o n r� U >> D n •• m F n O m O 0 > O 9 O. YO U L Z`" e. -0 U a) h o 0 0 CO a0 0 F a U a w U ❑ ▪ 0 0 a o a) LL u) a } w 0 m C7 ❑ a ❑ ❑ o 0 NU o 3 d To E a) c u_ Q L O) Q m a) co a N up {p J _ N F j O 2.2 N co N MO O O .J• U ..-=, o j13 _o > a) U 0 E m M z z °o_ 0 0 0 C a) o m `O ui 3 a) L 0. o 0 u) °) CO to co co O 0 H w m F 1 v Ln H N '45 > o a) L _ O a] O z > a) - 1.1 H ii)0 a) v E o c a a° o2 m a H c cu o 2 = u) m t ❑ Z O ❑ c O -oW O - N J a 0 0 a u- co ca CC u) a x CO o0 0 a` rn `"' co '-- Z Z i c ,E rn rn ' Loa a m 3 ova. a -c E _ N '° m > E a O t Z tq o co ��i = d N c N N o V O t0 M o N N ti 07 d 0 QI '0 n -" W CO r .6 Nfl; a) N g d V .. a. 'O 0 ❑ 2 'c O a V 12 c c -O W 2' C •0 7 0 ca d N a y d c0 11 0- O o • i co C w a •to at «a l6 N 0 ca fL) a a) N CL 0 Y L U3 ;1) H CD a) a) j W a' Qt co a) d m N 2 0 > > L a a) 'o (0 m E E F 2 F. m E c N c U O m C m N o 3 CO•a 0 a z 0 o E v o) a) 0 E N G7 oa c m = .S m 412 aa) E m a o ❑ cn . V8 C N O @ a) o O L -, a) o '� V 0 1`-: a 3 cI) 0 2 H -, w 2 2 0 5 g H a >_ o Z `n CO a) CO N O a' O O C7 Z O O CO 0 = u] N N .. O u) r. rn Z H 7 a th z E 0 N 2 R0) a= .-. siii m a N • O- M (0E 2 ) Ldz oa o > ) ,a) o a 0 0) 0• )) 2 < C• ..) @ E m a•2 z-- oo 01 cn o E CO o c n o N ❑ 43') E H = m m tom/) CD X Et 0 .. W > .N- 2 H o d 00 to V u_ H 0 2 W CO CO E Ln O a) a c° o) u) ca E F. u) el CV Q 0 -.7) z 1 1) 0) 2 W a M (o a) , o c N E a g N O N c) 2 E a ry > = m �7 Z 0 a -,-2 10 > 0 a W Z z Z t0 ',0 H Z 0) 0- c O 7 I J O W y c -C (0 v) aot O 0 to W aai a re A c o O ai ,..E m 0 0 'O 0 0 o.E 0 0 a) J rn Z 00 oO a DI a' O_ a) J a a)CD O C1 z N Q a O C T o a H a) m .. m Z m O U H ` N z N c a O 0 > > `p C E _ C Q O (n ._ E .O y C 0 O W a .. a) a a) a a a a s a O > O ' c 2 N E J -o c H c E t`) 0 a W U 0 CO W N E E CO c O W O y 0 H H 0 0 D M 0 M H 1 RECEIVE 2 1 50 12 /' APR 152015 25690 BAKER PRINT DISTRIBUTION LIST HUGHES AOGCC Please sign and return one copy of this transmittal form to: COMPANY BP Exploration Alaska Inc BP Exploration(Alaska) Inc. (mandatory) Petrotechnical Data Center, LR2-1 DATA LOGGED /u WELL NAME G-16B 900 E. Benson Blvd. 5 /2015M. K BENDER (mandatory) Anchorage,Alaska 99508 FIELD Prudhoe Bay to acknowledge receipt of this data. (mandatory) COUNTY North Slope Borough LOG TYPE LWD-Coil (mandatory) (mandatory) STATE Alaska BH DISTRICT Alaska (mandatory) (mandatory) LOG DATE: March 23,2015 TODAYS DATI 13-Apr-15 DISTRIBUTION LIST AUTHORIZED BY: Paula Lacey EMAIL: paula.laceyCa)bakerhuohes.com (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? No COMPANY FIELD FINAL CD Survey CD ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) LOGS LOGS (digital/image) S (Final Surveys) PERSON ATTENTION #OF PRINTS #Ur NKIN I S #OF COPIES #OF COP#OF COPIES V V V V v V 1 I3P North Slope 1 1 EOA,PBOC,PRB-20(Office 109) Attn:D&C Wells Project Aids Agatha Rutka&Barbara Glassmaker 900 East Benson Boulevard Anchorage,AK,99519 2 ConocoPhillips Alaska Inc. 1 1 Attn:Ricky Elgaricio ATO 3-344 700 G Street Anchorage,AK 99510 3 ExxonMobil,Alaska 1 1 1 1 Attn:Lynda M.Yaskell and/or Leonardo Elias 13201 C Street,Suite 505 Anchorage,AK 99503 4 State of Alaska -AOGCC I 1 2 1 Attn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 5 DNR-Division of Oil&Gas *** 1 1 1 Attn:Sean Clifton 550 West 7th Avenue,Suite 802 Anchorage,Alaska 99501 ***Stamp"confidential"on all material deliver to DNR 6 BP Exploration(Alaska)Inc. 2 1 1 1 Petrotechnical Data Center,LR2-1 900 E.Benson Blvd. 1Anchorage,Alaska 99508 kttn:Dodie Stinson TOTALS FOR THIS PAGE: 0 - 5 TOTALS FOR ALL PAGES: 0 5 5 5 4 0 t1 5012 25 690 RECEIVED APR 15 2015 0 bp AOGCC North America - ALASKA - BP Prudhoe Bay PB G Pad G-16 500292064300 G-16B 500292064302 Design: G-16B Survey Report - Geographic 26 March, 2015 ml BAKER HUGHES 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-16 Project: Prudhoe Bay TVD Reference: ORKB @ 77.08usft Site: PB G Pad MD Reference: ORKB @ 77.08usft Well: G-16 North Reference: True Wellbore: G-16B Survey Calculation Method: Minimum Curvature Design: G-16B Database: EDM R5K-Alaska PROD-ANCP1 Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB G Pad,TR-11-13 Site Position: Northing: 5,966,832.870 usft Latitude: 70°18'58.211 N From: Map Easting: 656,301.390 usft Longitude: 148°43'59.013 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.19 ° Well G-16 API No. 500292064300 Well Position +N/-S 0.00 usft Northing: 5,968,213.625 usft Latitude: 70°19'11.596 N +E/-W 0.00 usft Easting: 657,241.328 usft Longitude: 148°43'30.749 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 40.08 usft Wellbore G-16B API no. 500292064302 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2014 3/16/2015 19.37 81.02 57,587 Design G-16B Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,300.00 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (°) 37.00 0.00 0.00 222.24 Survey Program Date: 3/26/2015 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 9,300.00 1 :Sperry-Sun BOSS gyro multi(G-16) BOSS-GYRO Sperry-Sun BOSS gyro multishot 9,372.00 10,020.54 CoilTrak MWD(G-16B) MWD MWD-Standard 10,050.11 12,450.27 CoilTrak MWD+IFR(G-16B) MWD+IFR MWD+IFR correction 3/26/2015 1:25:10PM Page 2 COMPASS 5000.1 Build 61 VA I- Si) bp Survey Report-Geographic BAKER ES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-16 Project: Prudhoe Bay TVD Reference: ORKB©77.08usft Site: PB G Pad MD Reference: ORKB @ 77.08usft Well: G-16 North Reference: True Wellbore: G-16B Survey Calculation Method: Minimum Curvature Design: G-16B Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-S +E/-W Northing Easting (usft) (0) (0) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 37.00 0.00 0.00 37.00 0.00 0.00 5,968,213.625 657,241.328 70°19'11.596 N 148°43'30.749 W 100.00 0.33 247.85 100.00 -0.07 -0.17 5,968,213.553 657,241.161 70°19'11.595 N 148°43'30.754 W 200.00 0.42 241.47 200.00 -0.35 -0.76 5,968,213.258 657,240.579 70°19'11.593 N 148°43'30.771 W 300.00 0.50 210.13 299.99 -0.90 -1.30 5,968,212.694 657,240.049 70°19'11.587 N 148°43'30.787 W 400.00 0.83 218.69 399.99 -1.85 -1.97 5,968,211.737 657,239.398 70°19'11.578 N 148°43'30.806 W 500.00 0.83 223.23 499.98 -2.94 -2.92 5,968,210.625 657,238.472 70°19'11.567 N 148°43'30.834 W 600.00 1.00 226.74 599.96 -4.07 -4.05 5,968,209.476 657,237.364 70°19'11.556 N 148°43'30.867 W 700.00 1.00 232.14 699.95 -5.20 -5.37 5,968,208.315 657,236.064 70°19'11.545 N 148°43'30.906 W 800.00 0.92 238.50 799.94 -6.15 -6.75 5,968,207.331 657,234.711 70°19'11.535 N 148°43'30.946 W 900.00 0.50 249.95 899.93 -6.72 -7.84 5,968,206.739 657,233.629 70°19'11.530 N 1480 43'30.978 W 1,000.00 0.33 19.63 999.93 -6.60 -8.16 5,968,206.854 657,233.313 70°19'11.531 N 148°43'30.987 W 1,100.00 0.50 66.23 1,099.92 -6.15 -7.66 5,968,207.312 657,233.800 70°19'11.535 N 148°43'30.973 W 1,200.00 0.50 72.87 1,199.92 -5.85 -6.84 5,968,207.633 657,234.609 70°19'11.538 N 148°43'30.949 W 1,300.00 0.50 80.60 1,299.92 -5.65 -6.00 5,968,207.851 657,235.452 70°19'11.540 N 148°43'30.924 W 1,400.00 0.42 122.31 1,399.91 -5.78 -5.26 5,968,207.742 657,236.195 70°19'11.539 N 148°43'30.902 W 1,500.00 0.50 114.75 1,499.91 -6.15 -4.55 5,968,207.378 657,236.909 70°19'11.535 N 148°43'30.882 W 1,600.00 0.33 20.30 1,599.91 -6.07 -4.05 5,968,207.476 657,237.403 70°19'11.536 N 148°43'30.867 W 1,700.00 0.42 353.36 1,699.91 -5.43 -4.00 5,968,208.111 657,237.447 70°19'11.543 N 148°43'30.866 W 1,800.00 0.42 277.62 1,799.90 -5.02 -4.40 5,968,208.515 657,237.033 700 19'11.547 N 148°43'30.877 W 1,900.00 0.42 329.52 1,899.90 -4.66 -4.95 5,968,208.868 657,236.476 70°19'11.550 N 148°43'30.893 W 2,000.00 0.42 312.20 1,999.90 -4.09 -5.41 5,968,209.420 657,236.007 70°19'11.556 N 148°43'30.907 W 2,100.00 0.42 209.32 2,099.90 -4.17 -5.86 5,968,209.337 657,235.558 700 19'11.555 N 148°43'30.920 W 2,200.00 0.42 212.71 2,199.89 -4.79 -6.24 5,968,208.702 657,235.194 70°19'11.549 N 148°43'30.931 W 2,300.00 0.58 250.30 2,299.89 -5.27 -6.91 5,968,208.209 657,234.529 70°19'11.544 N 148°43'30.951 W 2,400.00 0.50 354.30 2,399.89 -5.01 -7.43 5,968,208.461 657,234.004 70°19'11.547 N 148°43'30.966 W 2,500.00 0.42 341.22 2,499.89 -4.23 -7.59 5,968,209.239 657,233.826 70°19'11.554 N 148°43'30.971 W 2,600.00 0.50 27.57 2,599.88 -3.49 -7.51 5,968,209.974 657,233.895 70°19'11.562 N 148°43'30.968 W 2,700.00 0.50 353.50 2,699.88 -2.67 -7.36 5,968,210.797 657,234.030 70°19'11.570 N 148°43'30.964 W 2,800.00 1.25 95.33 2,799.87 -2.34 -6.32 5,968,211.151 657,235.060 70°19'11.573 N 148°43'30.933 W 2,900.00 1.83 31.84 2,899.84 -1.09 -4.39 5,968,212.446 657,236.961 70°19'11.585 N 148°43'30.877 W 3,000.00 3.67 318.12 2,999.75 2.65 -5.69 5,968,216.159 657,235.589 70°19'11.622 N 148°43'30.915 W 3,100.00 4.42 316.41 3,099.50 7.83 -10.48 5,968,221.231 657,230.688 70°19'11.673 N 148°43'31.055 W 3,200.00 3.42 246.12 3,199.31 9.41 -15.87 5,968,222.702 657,225.270 70°19'11.689 N 148°43'31.212 W 3,300.00 5.00 201.72 3,299.06 4.15 -20.21 5,968,217.355 657,221.039 70°19'11.637 N 148°43'31.339 W 3,400.00 7.00 212.36 3,398.51 -5.04 -25.08 5,968,208.059 657,216.359 70°19'11.546 N 148°43'31.481 W 3,500.00 9.00 228.82 3,497.55 -15.34 -34.23 5,968,197.570 657,207.427 70°19'11.445 N 148°43'31.748 W 3,600.00 11.00 236.27 3,596.03 -25.79 -48.06 5,968,186.835 657,193.826 70°19'11.342 N 148°43'32.151 W 3,700.00 14.33 239.14 3,693.58 -37.44 -66.62 5,968,174.800 657 175.512 70°19'11.228 N 148°43'32.693 W 3,800.00 17.00 240.10 3,789.86 -51.08 -89.92 5,968,160.679 657,152.505 70°19'11.094 N 148°43'33.373 W 3,900.00 18.92 241.78 3,884.98 -66.03 -116.88 5,968,145.164 657,125.865 70°19'10.947 N 148°43'34.160 W 4,000.00 21.50 243.71 3,978.82 -81.82 -147.60 5,968,128.739 657,095.484 70°19'10.791 N 148°43'35.056 W 4,100.00 23.50 243.50 4,071.20 -98.83 -181.88 5,968,111.012 657,061.575 70°19'10.624 N 148°43'36.056 W 4,200.00 25.00 243.17 4,162.38 -117.27 -218.58 5,968,091.814 657,025.270 70°19'10.443 N 148°43'37.127 W 4,300.00 27.33 242.84 4,252.12 -137.29 -257.86 5,968,070.978 656,986.415 700 19'10.246 N 148°43'38.274 W 4,400.00 29.67 243.64 4,340.00 -158.76 -300.47 5,968,048.621 656,944.270 70°19'10.035 N 148°43'39.517 W 4,500.00 33.50 241.34 4,425.17 -182.99 -346.88 5,968,023.421 656,898.380 70°19'9.796 N 148°43'40.871 W 4,600.00 37.42 244.88 4,506.62 -209.14 -398.63 5,967,996.198 656,847.192 70°19'9.539 N 148°43'42.381 W 4,700.00 39.67 249.53 4,584.84 -233.21 -456.06 5,967,970.933 656,790.281 700 19'9.302 N 148°43'44.057 W 4,800.00 40.50 252.42 4,661.36 -254.18 -516.93 5,967,948.692 656,729.873 70°19'9.096 N 148°43'45.833 W 4,900.00 41.50 254.38 4,736.83 -272.91 -579.80 5,967,928.650 656,667.417 70°19'8.912 N 148°43'47.668 W 5,000.00 42.83 257.97 4,810.96 -288.92 -644.96 5,967,911.282 656,602.606 70°19'8.754 N 148°43'49.569 W 5,100.00 43.75 258.24 4,883.75 -303.05 -712.06 5,967,895.748 656,535.826 70°19'8.615 N 1480 43'51.527 W 5,200.00 41.50 258.40 4,957.32 -316.76 -778.37 5,967,880.653 656,469.819 70°19'8.480 N 148°43'53.462 W 5,300.00 41.00 259.40 5,032.51 -329.46 -843.07 5,967,866.605 656,405.406 70°19'8.355 N 148°43'55.350 W 5,400.00 40.25 260.48 5,108.41 -340.83 -907.18 5,967,853.888 656,341.556 70°19'8.243 N 148°43'57.220 W 3/26/2015 1:25.:10PM Page 3 COMPASS 5000.1 Build 61 rr 0 bp Survey Report-Geographic BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-16 Project: Prudhoe Bay TVD Reference: ORKB @ 77.08usft Site: PB G Pad MD Reference: ORKB @ 77.08usft Well: G-16 North Reference: True Wellbore: G-16B Survey Calculation Method: Minimum Curvature Design: G-16B Database: EDM RSK-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +EI-W Northing Easting (usft) (e) (e) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 5,500.00 40.33 262.60 5,184.69 -350.35 -971.13 5,967,843.039 656,277.820 70°19'8.150 N 1480 43'59.086 W 5,600.00 39.83 263.46 5,261.20 -358.16 -1,035.04 5,967,833.887 656,214.094 70°19'8.073 N 148°44'0.951 W 5,700.00 41.00 260.45 5,337.35 -367.25 -1,099.21 5,967,823.455 656,150.129 70°19'7.983 N 148°44'2.824 W 5,800.00 40.83 249.94 5,413.01 -383.93 -1,162.34 5,967,805.462 656,087.365 70°19'7.819 N 148°44'4.666 W 5,900.00 39.25 240.47 5,489.63 -410.76 -1,220.64 5,967,777.416 656,029.652 70°19'7.555 N 1480 44'6.367 W 6,000.00 38.42 231.10 5,567.60 -445.89 -1,272.39 5,967,741.207 655,978.651 70°19'7.210 N 1480 44'7.877 W 6,100.00 39.17 229.52 5,645.54 -485.91 -1,320.59 5,967,700.194 655,931.299 70°19'6.816 N 148°44'9.283 W 6,200.00 39.25 228.90 5,723.02 -527.21 -1,368.45 5,967,657.905 655,884.317 70°19'6.410 N 148°44'10.679 W 6,300.00 39.00 230.57 5,800.60 -567.99 -1,416.60 5,967,616.126 655,837.040 70°19'6.009 N 148°44'12.084 W 6,400.00 38.83 230.95 5,878.41 -607.73 -1,465.25 5,967,575.382 655,789.235 70°19'5.618 N 148°44'13.503 W 6,500.00 38.83 230.25 5,956.31 -647.52 -1,513.70 5,967,534.581 655,741.632 70°19'5.226 N 148°44'14.917 W 6,600.00 38.92 230.99 6,034.16 -687.34 -1,562.21 5,967,493.757 655,693.969 70°19'4.834 N 148°44'16.332 W 6,700.00 38.50 231.58 6,112.19 -726.46 -1,611.01 5,967,453.632 655,646.007 70°19'4.450 N 148°44'17.756 W 6,800.00 30.00 230.99 6,194.78 -761.60 -1,654.90 5,967,417.579 655,602.864 70°19'4.104 N 148°44'19.036 W 6,900.00 37.50 231.34 6,277.87 -796.40 -1,698.16 5,967,381.883 655,560.349 70°19'3.762 N 148°44'20.298 W 7,000.00 36.92 231.27 8,357.51 -834.21 -1,745.35 5,967,343.099 655,513.956 70°19'3.390 N 148°44'21.675 W 7,100.00 35.67 235.26 6,438.12 -869.62 -1,792.75 5,967,306.704 655,467.314 70°19'3.041 N 148°44'23.058 W 7,200.00 34.92 235.60 6,519.73 -902.41 -1,840.33 5,967,272.931 655,420.439 70°19'2.719 N 148°44'24.446 W 7,300.00 34.00 234.14 6,602.19 -934.96 -1,886.61 5,967,239.421 655,374.857 70°19'2.398 N 148°44'25.796 W 7,400.00 33.17 235.72 6,685.49 -966.75 -1,931.87 5,967,206.694 655,330.270 70°19'2.086 N 148°44'27.116 W 7,500.00 32.42 236.32 6,769.56 -997.02 -1,976.78 5,967,175.488 655,286.006 70°19'1.788 N 148°44'28.426 W 7,600.00 31.67 237.67 6,854.32 -1,025.92 -2,021.27 5,967,145.659 655,242.134 70°19'1.503 N 148°44'29.724 W 7,700.00 30.83 232.26 6,939.83 -1,055.65 -2,063.73 5,967,115.049 655,200.314 70°19'1.211 N 148°44'30.963 W 7,800.00 29.75 232.16 7,026.17 -1,086.56 -2,103.59 5,967,083.317 655,161.115 70°19'0.907 N 148°44'32.125 W 7,900.00 28.75 233.20 7,113.42 -1,116.19 -2,142.44 5,967,052.884 655,122.894 70°19'0.615 N 148°44'33.259 W 8,000.00 27.75 232.63 7,201.51 -1,144.73 -2,180.20 5,967,023.564 655,085.743 70°19'0.335 N 148°44'34.360 W 8,100.00 27.00 231.84 7,290.31 -1,172.88 -2,216.55 5,966,994.655 655,049.992 70°19'0.058 N 148°44'35.421 W 8,200.00 26.58 233.10 7,379.58 -1,200.34 -2,252.29 5,966,966.456 655,014.838 70°18'59.787 N 148°44'36.463 W 8,300.00 25.75 233.79 7,469.33 -1,226.61 -2,287.71 5,966,939.456 654,979.981 70°18'59.529 N 148°44'37.496 W 8,400.00 25.42 236.35 7,559.53 -1,251.33 -2,323.10 5,966,913.996 654,945.115 70°18'59.286 N 148°44'38.529 W 8,500.00 25.17 237.22 7,649.94 -1,274.74 -2,358.85 5,966,889.848 654,909.870 70°18'59.055 N 148°44'39.571 W 8,600.00 25.50 240.45 7,740.33 -1,296.87 -2,395.45 5,966,866.957 654,873.738 70°18'58.838 N 148°44'40.639 W 8,700.00 25.33 241.72 7,830.65 -1,317.62 -2,433.02 5,966,845.425 654,836.619 70°18'58.633 N 148°44'41.735 W 8,800.00 25.33 242.72 7,921.04 -1,337.56 -2,470.87 5,966,824.698 654,799.197 70°18'58.437 N 148°44'42.839 W 8,900.00 25.00 245.63 8,011.55 -1,356.08 -2,509.13 5,966,805.377 654,761.334 70°18'58.255 N 148°44'43.955 W 9,000.00 24.33 251.80 8,102.44 -1,371.24 -2,547.96 5,966,789.413 654,722.839 70°18'58.106 N 148°44'45.088 W 9,100.00 23.33 255.57 8,193.92 -1,382.61 -2,586.70 5,966,777.235 654,684.340 70°18'57.994 N 148°44'46.218 W 9,200.00 22.42 257.68 8,286.05 -1,391.61 -2,624.51 5,966,767.442 654,646.731 70°18'57.905 N 148°44'47.321 W 9,300.00 21.75 261.72 8,378.72 -1,398.35 -2,661.48 5,966,759.932 654,609.915 70°18'57.839 N 148°44'48.400 W TIP 9,372.00 20.67 263.54 8,445.84 -1,401.70 -2,687.31 5,966,756.041 654,584.164 70°18'57.806 N 148°44'49.153 W KOP 9,390.04 14.42 263.54 8,463.04 -1,402.31 -2,692.71 5,966,755.316 654,578.777 70°18'57.800 N 148°44'49.311 W Interpolated Azimuth 9,420.07 13.99 278.00 8,492.16 -1,402.23 -2,700.02 5,966,755.248 654,571.465 70°18'57.800 N 148°44'49.524 W Interpolated Azimuth 9,450.07 12.38 287.69 8,521.37 -1,400.75 -2,706.68 5,966,756.590 654,564.780 70°18'57.815 N 148°44'49.719 W 9,480.06 11.57 263.97 8,550.72 -1,400.08 -2,712.74 5,966,757.124 654,558.710 70°18'57.821 N 148°44'49.895 W 9,510.08 12.11 255.30 8,580.11 -1,401.20 -2,718.78 5,966,755.883 654,552.695 70°18'57.810 N 148°44'50.072 W 9,540.08 16.53 248.74 8,609.17 -1,403.55 -2,725.80 5,966,753.389 654,545.721 70°18'57.787 N 148°44'50.276 W 9,569.97 21.21 256.47 8,637.45 -1,406.36 -2,735.03 5,966,750.388 654,536.557 70°18'57.760 N 148°44'50.546 W 9,636.66 16.53 241.07 8,700.58 -1,413.78 -2,755.08 5,966,742.549 654,516.662 70°18'57.687 N 148°44'51.131 W 9,660.03 15.04 229.17 8,723.07 -1,417.37 -2,760.29 5,966,738.849 654,511.533 70°18'57.651 N 148°44'51.283 W 9,690.21 15.88 216.79 8,752.17 -1,423.24 -2,765.73 5,966,732.869 654,506.220 70°18'57.594 N 148°44'51.441 W 9,720.20 19.95 215.19 8,780.70 -1,430.71 -2,771.13 5,966,725.287 654,500.970 70°18'57.520 N 148°44'51.599 W 3/26/2015 1:25:10PM Page 4 COMPASS 5000.1 Build 61 4 • 0 by Survey Report-Geographic BAHUKER HES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-16 Project: Prudhoe Bay TVD Reference: ORKB @ 77.08usft Site: PB G Pad MD Reference: ORKB @ 77.08usft Well: G-16 North Reference: True Wellbore: G-16B Survey Calculation Method: Minimum Curvature Design: G-16B Database: EDM R5K-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 9,752.06 24.03 210.23 8,810.24 -1,440.76 -2,777.54 5,966,715.104 654,494.781 70°18'57.421 N 148°44'51.785 W 9,781.89 28.43 208.21 8,836.99 -1,452.27 -2,783.95 5,966,703.462 654,488.606 70°18'57.308 N 148°44'51.973 W 9,810.53 32.85 207.32 8,861.62 -1,465.19 -2,790.75 5,966,690.408 654,482.088 70°18'57.181 N 148°44'52.171 W 9,845.60 37.34 204.18 8,890.31 -1,483.35 -2,799.47 5,966,672.066 654,473.744 70°18'57.002 N 148°44'52.425 W 9,872.00 41.54 202.80 8,910.70 -1,498.73 -2,806.15 5,966,656.551 654,467.393 70°18'56.851 N 148°44'52.620 W 9,900.60 45.92 201.55 8,931.36 -1,517.04 -2,813.60 5,966,638.094 654,460.327 70°18'56.671 N 148°44'52.837 W 9,930.48 50.38 201.11 8,951.29 -1,537.76 -2,821.69 5,966,617.202 654,452.672 70°18'56.467 N 148°44'53.073 W 9,962.80 55.39 200.16 8,970.79 -1,561.88 -2,830.76 5,966,592.905 654,444.107 70°18'56.230 N 148°44'53.337 W 9,990.60 60.05 200.17 8,985.63 -1,583.93 -2,838.86 5,966,570.685 654,436.472 70°18'56.013 N 148°44'53.573 W 10,020.54 64.88 199.13 8,999.47 -1,608.93 -2,847.78 5,966,545.509 654,428.078 70°18'55.767 N 148°44'53.833 W 10,050.11 69.61 197.25 9,010.90 -1,634.83 -2,856.28 5,966,519.439 654,420.121 70°18'55.512 N 148°44'54.081 W 10,082.79 74.50 193.18 9,020.97 -1,664.82 -2,864.42 5,966,489.290 654,412.611 70°18'55.217 N 148°44'54.318 W 10,110.27 77.16 187.80 9,027.70 -1,691.01 -2,869.27 5,966,463.009 654,408.320 70°18'54.960 N 148°44'54.459 W 10,140.33 79.88 182.32 9,033.69 -1,720.33 -2,871.86 5,966,433.634 654,406.345 70°18'54.671 N 148°44'54.534 W 10,170.32 84.46 177.47 9,037.78 -1,750.03 -2,871.79 5,966,403.951 654,407.028 70°18'54.379 N 148°44'54.532 W 10,200.30 86.31 181.11 9,040.19 -1,779.90 -2,871.43 5,966,374.093 654,408.023 70°18'54.085 N 148°44'54.521 W 10,231.59 89.94 185.64 9,041.21 -1,811.11 -2,873.27 5,966,342.858 654,406.836 70°18'53.778 N 148°44'54.574 W 10,260.26 91.32 189.45 9,040.90 -1,839.52 -2,877.03 5,966,314.373 654,403.669 70°18'53.499 N 148°44'54.684 W 10,290.49 91.44 194.30 9,040.17 -1,869.09 -2,883.25 5,966,284.686 654,398.073 70°18'53.208 N 148°44'54.865 W 10,320.45 91.84 188.95 9,039.31 -1,898.41 -2,889.28 5,966,255.245 654,392.656 70°18'52.920 N 148°44'55.041 W 10,350.27 94.67 184.19 9,037.62 -1,927.97 -2,892.69 5,966,225.618 654,389.870 70°18'52.629 N 148°44'55.140 W 10,380.72 89.82 178.13 9,036.42 -1,958.37 -2,893.30 5,966,195.217 654,389.894 70°18'52.330 N 148°44'55.157 W 10,410.69 88.07 172.39 9,036.98 -1,988.22 -2,890.83 5,966,165.429 654,392.993 70°18'52.036 N 148°44'55.085 W 10,431.03 88.31 168.23 9,037.62 -2,008.26 -2,887.40 5,966,145.471 654,396.833 70°18'51.839 N 148°44'54.985 W 10,460.91 91.38 166.73 9,037.70 -2,037.42 -2,880.93 5,966,116.450 654,403.918 70°18'51.553 N 148°44'54.795 W 10,490.77 94.89 166.06 9,036.07 -2,066.40 -2,873.92 5,966,087.631 654,411.535 70°18'51.268 N 148°44'54.590 W 10,520.79 94.49 170.27 9,033.61 -2,095.67 -2,867.78 5,966,058.491 654,418.281 70°18'50.980 N 148°44'54.411 W 10,551.26 94.64 173.11 9,031.19 -2,125.72 -2,863.39 5,966,028.541 654,423.299 70°18'50.684 N 148°44'54.283 W 10,587.81 90.74 169.16 9,029.47 -2,161.78 -2,857.77 5,965,992.610 654,429.679 70°18'50.330 N 148°44'54.118 W 10,611.12 92.73 165.49 9,028.76 -2,184.51 -2,852.65 5,965,969.997 654,435.264 70°18'50.106 N 148°44'53.969 W 10,640.61 93.97 159.82 9,027.04 -2,212.60 -2,843.88 5,965,942.100 654,444.622 70°18'49.830 N 148°44'53.713 W 10,670.88 90.28 157.31 9,025.92 -2,240.75 -2,832.83 5,965,914.190 654,456.261 70°18'49.553 N 148°44'53.390 W 10,700.93 90.74 156.60 9,025.65 -2,268.40 -2,821.07 5,965,886.794 654,468.599 70°18'49.281 N 148°44'53.046 W 10,731.07 90.83 151.38 9,025.24 -2,295.47 -2,807.86 5,965,860.003 654,482.374 70°18'49.015 N 148°44'52.661 W 10,760.85 91.35 153.39 9,024.67 -2,321.85 -2,794.06 5,965,833.919 654,496.723 70°18'48.756 N 148°44'52.258 W ill 10,791.01 94.05 158.50 9,023.25 -2,349.35 -2,781.78 5,965,806.686 654,509.572 70°18'48.485 N 148°44'51.899 W 10,820.79 92.12 162.68 9,021.64 -2,377.39 -2,771.90 5,965,778.862 654,520.035 70°18'48.209 N 148°44'51.611 W 10,850.87 93.13 168.46 9,020.27 -2,406.48 -2,764.42 5,965,749.939 654,528.127 70°18'47.923 N 148°44'51.392 W 10,880.81 90.80 172.85 9,019.24 -2,436.00 -2,759.56 5,965,720.533 654,533.601 70°18'47.633 N 148°44'51.250 W 10,911.10 90.34 178.32 9,018.94 -2,466.18 -2,757.23 5,965,690.404 654,536.563 70°18'47.336 N 148°44'51.182 W 10,941.11 89.75 179.03 9,018.91 -2,496.18 -2,756.53 5,965,660.426 654,537.885 70°18'47.041 N 148°44'51.161 W 10,970.70 88.25 175.08 9,019.43 -2,525.72 -2,755.02 5,965,630.926 654,540.023 70°18'46.751 N 148°44'51.117 W 11,000.71 88.92 170.30 9,020.17 -2,555.47 -2,751.20 5,965,601.267 654,544.461 70°18'46.458 N 148°44'51.005 W 11,029.37 87.58 166.53 9,021.05 -2,583.53 -2,745.45 5,965,573.338 654,550.799 70°18'46.182 N 148°44'50.837 W 11,060.64 84.80 163.54 9,023.13 -2,613.67 -2,737.39 5,965,543.379 654,559.481 70°18'45.886 N 148°44'50.602 W 11,090.64 83.35 159.09 9,026.22 -2,641.93 -2,727.84 5,965,515.328 654,569.626 70°18'45.608 N 148°44'50.323 W 11,120.88 88.99 154.18 9,028.24 -2,669.60 -2,715.88 5,965,487.910 654,582.164 70°18'45.336 N 148°44'49.973 W 11,150.63 85.85 151.41 9,029.58 -2,696.03 -2,702.29 5,965,461.775 654,596.297 70°18'45.076 N 148°44'49.577 W 11,181.03 84.28 147.04 9,032.20 -2,722.05 -2,686.80 5,965,436.091 654,612.329 70°18'44.820 N 148°44'49.125 W 11,210.85 86.62 142.45 9,034.57 -2,746.31 -2,669.65 5,965,412.193 654,629.986 70°18'44.582 N 148°44'48.624 W 11,250.89 90.92 136.29 9,035.43 -2,776.67 -2,643.60 5,965,382.390 654,656.664 70°18'44.283 N 148°44'47.864 W 11,281.46 90.37 132.75 9,035.08 -2,798.10 -2,621.81 5,965,361.423 654,678.898 70°18'44.072 N 148°44'47.228 W 11,310.85 88.83 129.37 9,035.29 -2,817.40 -2,599.65 5,965,342.592 654,701.452 70°18'43.883 N 148°44'46.582 W 11,341.63 91.53 126.20 9,035.19 -2,836.25 -2,575.33 5,965,324.252 654,726.161 70°18'43.697 N 148°44'45.872 W 11,370.57 90.86 129.70 9,034.59 -2,854.04 -2,552.52 5,965,306.945 654,749.339 70°18'43.522 N 148°44'45.206 W 3/26/2015 1:25:10PM Page 5 COMPASS 5000.1 Build 61 FA- 0 bp Survey Report-Geographic HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-16 Project: Prudhoe Bay TVD Reference: ORKB @ 77.08usft Site: PB G Pad MD Reference: ORKB @ 77.08usft Well: G-16 North Reference: True Wellbore: G-16B Survey Calculation Method: Minimum Curvature Design: G-16B Database: EDM RSK-Alaska PROD-ANCP1 Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +NI-S +E/-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 11,400.68 89.23 133.28 9,034.56 -2,873.99 -2,529.97 5,965,287.479 654,772.300 70°18'43.326 N 148°44'44.548 W 11,431.14 91.05 140.14 9,034.49 -2,896.14 -2,509.09 5,965,265.766 654,793.631 70°18'43.108 N 148°44'43.939 W 11,460.79 89.08 144.32 9,034.45 -2,919.58 -2,490.94 5,965,242.721 654,812.272 70°18'42.878 N 148°44'43.409 W 11,490.37 89.97 148.99 9,034.70 -2,944.28 -2,474.69 5,965,218.367 654,829.039 70°18'42.635 N 148°44'42.935 W 11,520.33 90.80 153.28 9,034.50 -2,970.51 -2,460.23 5,965,192.446 654,844.043 70°18'42.377 N 148°44'42.513 W 11,550.94 91.56 157.13 9,033.87 -2,998.29 -2,447.39 5,965,164.946 654,857.453 70°18'42.104 N 148°44'42.138 W 11,580.37 91.47 161.06 9,033.09 -3,025.76 -2,436.90 5,965,137.697 654,868.521 70°18'41.834 N 148°44'41.832 W 11,609.75 92.21 161.97 9,032.15 -3,053.61 -2,427.59 5,965,110.050 654,878.412 70°18'41.560 N 148°44'41.560 W 11,640.05 91.47 160.71 9,031.17 -3,082.30 -2,417.90 5,965,081.570 654,888.700 70°18'41.278 N 148°44'41.277 W 11,670.21 93.53 156.01 9,029.86 -3,110.30 -2,406.79 5,965,053.812 654,900.390 70°18'41.003 N 148°44'40.953 W 11,700.33 95.29 153.43 9,027.54 -3,137.45 -2,393.97 5,965,026.937 654,913.777 70°18'40.736 N 148°44'40.579 W 11,730.53 95.10 149.48 9,024.81 -3,163.87 -2,379.60 5,965,000.831 654,928.695 70°18'40.476 N 148°44'40.159 W 11,760.44 94.27 145.92 9,022.36 -3,189.06 -2,363.67 5,964,975.979 654,945.145 70°18'40.228 N 148°44'39.695 W 11,790.26 92.67 142.61 9,020.56 -3,213.22 -2,346.29 5,964,952.194 654,963.028 70°18'39.991 N 148°44'39.187 W 11,820.45 91.87 138.36 9,019.36 -3,236.49 -2,327.10 5,964,929.336 654,982.699 70°18'39.762 N 148°44'38.627 W 11,850.45 92.24 135.03 9,018.28 -3,258.30 -2,306.54 5,964,907.959 655,003.710 70°18'39.547 N 148°44'38.028 W 11,880.35 91.07 131.52 9,017.42 -3,278.78 -2,284.79 5,964,887.937 655,025.890 70°18'39.346 N 148°44'37.393 W 11,910.30 89.94 128.79 9,017.16 -3,298.09 -2,261.90 5,964,869.111 655,049.175 70°18'39.156 N 148°44'36.725 W 11,941.54 89.20 124.64 9,017.39 -3,316.77 -2,236.86 5,964,850.969 655,074.595 70°18'38.973 N 148°44'35.995 W 11,970.41 89.88 120.57 9,017.62 -3,332.32 -2,212.55 5,964,835.931 655,099.228 70°18'38.820 N 148°44'35.285 W 12,000.21 88.86 117.54 9,017.95 -3,346.79 -2,186.50 5,964,822.011 655,125.568 70°18'38.677 N 148°44'34.525 W 12,030.81 88.68 114.45 9,018.61 -3,360.20 -2,159.01 5;964,809.183 655,153.336 70°18'38.546 N 148°44'33.723 W 12,060.47 88.83 111.16 9,019.25 -3,371.69 -2,131.68 5,964,798.268 655,180.900 70°18'38.433 N 148°44'32.926 W 12,090.32 88.13 107.79 9,020.04 -3,381.63 -2,103.55 5,964,788.913 655,209.228 70°18'38.335 N 148°44'32.105 W 12,120.41 87.21 104.54 9,021.27 -3,390.00 -2,074.68 5,964,781.151 655,238.267 70°18'38.253 N 148°44'31.263 W 12,150.32 88.80 102.66 9,022.31 -3,397.03 -2,045.63 5,964,774.733 655,267.457 70°18'38.184 N 148°44'30.416 W 12,180.33 91.10 98.86 9,022.34 -3,402.63 -2,016.15 5,964,769.751 655,297.041 70°18'38.129 N 148°44'29.556 W 12,210.36 90.28 93.65 9,021.97 -3,405.90 -1,986.31 5,964,767.107 655,326.940 70°18'38.097 N 148°44'28.686 W 12,240.47 93.04 97.56 9,021.10 -3,408.84 -1,956.37 5,964,764.797 655,356.937 70°18'38.068 N 148°44'27.812 W 12,270.42 93.10 102.10 9,019.50 -3,413.95 -1,926.91 5,964,760.311 655,386.496 70°18'38.018 N 148°44'26.953 W 12,300.57 91.11 106.36 9,018.39 -3,421.35 -1,897.71 5,964,753.520 655,415.839 70°18'37.945 N 148°44'26.101 W 12,330.39 91.38 111.21 9,017.74 -3,430.95 -1,869.49 5,964,744.516 655,444.248 70°18'37.851 N 148°44'25.278 W 12,361.09 91.47 116.72 9,016.98 -3,443.41 -1,841.46 5,964,732.646 655,472.535 70°18'37.728 N 148°44'24.460 W 12,390.36 91.01 120.68 9,016.34 -3,457.46 -1,815.80 5,964,719.137 655,498.485 70°18'37.590 N 148°44'23.712 W 12,420.61 90.77 125.89 9,015.87 -3,474.05 -1,790.52 5,964,703.078 655,524.101 70°18'37.427 N 148°44'22.974 W 12,450.27 92.30 128.76 9,015.08 -3,492.03 -1,766.95 5,964,685.602 655,548.045 70°18'37.250 N 148°44'22.287 W 12,502.00 92.30 128.76 9,013.00 -3,524.39 -1,726.64 5,964,654.096 655,589.016 70°18'36.932 N 148°44'21.111 W Projection to TD 3/26/2015 1:25.10PM Page 6 COMPASS 5000.1 Build 61 1 1 50 12 J 6 8 1 RECEIVED Ireig` PRINT DISTRIBUTION LIST APR 14 2015 BAKER ES AOGCC COMPANY BP Exploration Alaska,Inc. INTERMEDIATE FINAL Yes (mandatory) LOGGED DATA WELL NAME G-16B RUN NUMBER 1 5 5 (mandatory) M.K.BENDER FIELD Prudhoe Bay Unit BH SALESMAN Henry Giordanelli (mandatory) (mandatory) COUNTY North Slope BH DISTRICT Prudhoe Bay,AK (mandatory) (mandatory) STATE Alaska PAGE 1 OF 1 (mandatory) LOG DATE: March 25,2015 TODAYS DATE: 4/11/2015 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: Henry Giordanelli (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANY A B C D ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) L.I.S. FILM PERSON ATTENTION #OF PRINTS#OF COPIES#OF COPIES#OF COPIES#OF COPIES#OF COPIES ' U U U U 1 ConocoPhillips Alaska Inc. 2 1 1 1 Attn:Ricky Elgaricio A= G-16B_MRPM_RAW_25MAR2015_BHI.meta ATO 3-344 700 G Street _ Anchorage,AK 99510 B= "(Folder 1 on cd/dvd) G-16B_MRPM_RAW_25MAR2015_BHI.meta C= "(Folder 2 on cd/dvd) G-16B_MRPM_RAW_25MAR2015_BHI.PDF D= ***(Folder 3 on cd/dvd) G-16B_MRPM_RAW_PASSO2UP_25MAR2015_BHI.dlis G-16B MRPM RAW PASSO1DOWN 25MAR2015 BHI.dlis ""'(Folder 4 on cd/dvd G-16B_MRPM_RAW_PASSO1DOWN_25MAR2015_BH1.1as G-16B MRPM RAW PASSO2UP 25MAR2015 BHI.las Folder 1 on cd/dvd needs to be named "META" ** Folder 2 on cd/dvd needs to be named"PDF" yr** Folder 3 on cd/dvd needs to be named"DLIS" 'r*'r* Folder 4 on cd/dvd needs to be named"LAS" 2 ExxonMobil,Alaska 1 1 1 1 Attn:Lynda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr.Suite 600 Anchorage,AK 99503 3 State of Alaska-AOGCC I 1 1 I 1 I 1 Attn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 4 DNR-Division of Oil&Gas 0 0 1 1 I Attn:Sean Clifton 550 West 7th Avenue,Suite 802 Anchorage,Alaska 99501 TOTALS FOR THIS PAGE: 4 3 4 4 #REF! #REF! TOTALS FOR ALL PAGES: 4 3 4 4 #REF! #REF! OF T� ,w\AI//7„'s THE STATE Alaska Oil and Gas of Conservation Commission ALASKA 333 West Seventh Avenue de GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Th Main: 907.279.1433 ALAS*".. Fax: 907.276 7542 www.aogcc.alaska.gov John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. Post Office Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU G-16B BP Exploration (Alaska), Inc. Permit No: 215-012 Surface Location: 3414' FNL, 3003' FEL, Sec. 12, T11N, R13E, UM Bottomhole Location: 1546' FNL, 4985' FEL, Sec. 13, T11N, R13E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, P Cathy P. F erster Chair DATED this 23 day of January, 2015. STATE OF ALASKA RECEIVED ALA OIL AND GAS CONSERVATION COMIVON JAN 2 0 2015 PERMIT TO DRILL 20 AAC 25.005 AOGCC 1 a.Type of work: 1 b.Proposed Well Class: ®Development Oil 0 Service-Winj ®Single Zone - 1 c.Specify if well is proposed for: ❑Drill 0 Lateral 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 Coalbed Gas 0 Gas Hydrates •®Redrill 0 Reentry 0 Exploratory Cl Service-WAG 0 Service-Disp 0 Geothermal 0 Shale Gas 2 Operator Name. 5.Bond ®Blanket 0 Single Well '11.Well Name and Number: BP Exploration (Alaska) Inc. Bond No 6194193 • PBU G-16B 3. Address 6. Proposed Depth: X12 Field/Pool(s) P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 12225' ' TVD 8963'ss • Prudhoe Bay/Prudhoe Bay 4a.Location of Well(Governmental Section). 7.Property Designation(Lease Number): Surface: ADL 028280&028285 3414' FNL, 3003'FEL, Sec. 12,T11N, R13E, UM Top of Productive Horizon. 8.Land Use Permit: 13 Approximate Spud Date: 4772' FNL,490' FEL, Sec. 11,T11N, R13E, UM March 1,2015 Total Depth 9.Acres in Property: 14 Distance to Nearest Property: 1546' FNL,4985'FEL, Sec. 13,T11N, R13E, UM 2560 20075' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10 KB Elevation above MSL• 77.08'• feet 15.Distance to Nearest Well Open Surface: x 657241 . y-5968213 • Zone- ASP4 GL Elevation above MSL: 40.08'• feet to Same Pool: 460' 16.Deviated Wells. Kickoff Depth: 9375' feet . 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 96 degrees Downhole: • 374'(J D5 i Surface: 2 • -2,3V) P 5 I 18. Casing Program Specifications Top-Setting Depth-Bottbm Quantity 6f Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 3-1/4" 2-3/8" 4.7# L-80 TH511 2900' 9325' 8325'ss 12225' 8963'ss81 sxClass'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth TVD(ft): Junk(measured) 11463' 9048' 10120' 11462' 9048' None Casing Length Size Cement Volume MD TVD Conductor/Structural 80' 20" 8 cu yds Concrete 38'- 118' 38'- 118' Surface 2647' 13-3/8" 3621 cu ft Permafrost II 37'-2684' 37'-2684' Intermediate 9311' 9-5/8" 1277 cu ft Class'G', 130 cu ft PF'C' 36'-9347' 36'-8422' Production Liner 1343' 7" 372 cu ft Class'G' 8852'- 10195' 7968'-9045' Scab Liner 7603' 7"x 5-1/2"x 4-1/2"x 3-1/2•' 1207 cu ft Class'G' 1993'-9596' 1993'-8656' Liner 2079' 2-3/8" 28 cu ft Class'G', Uncemented Slotted Liner 9391'- 11463' 8464'-9048' Perforation Depth MD(ft): 10000'-10040',Slotted Liner 10329'-11462' Perforation Depth TVD(ft): 9018'-9037',Slotted Liner 9036'-9048' 20.Attachments: 0 Property Plat ®BOP Sketch 0 Drilling Program ❑Time vs Depth Plot 0 Shallow Hazard Analysis 0 Diverter Sketch 0 Seabed Report 0 Drilling Fluid Program 0 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative. Date 22. I hereby certify that the foregoing is true and correct: Contact J Kyle Raese,564-4629 Printed Name Jo , 1r :n Title Engineering Team Leader / Email John Raese@bp con, Signatu ' Phone 564-4711 Date �/ t7ASr Commission Use Only Permit To Drill. API Number: Permit Approval DaSee cover letter for Number 2- _`D -0(Z-- 50-029-20643-02-00 I-23-(5e: other requirements: Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas ®` contained shales: _/ Other: 8 D 9 --7--.5i- to 3C C ,,i5-4 Samples Req'd 0 Yes (eNo Mud Log Req'd: 0 Yes Q No ,-1 `l '-v I a d p rC Kt,vi.;4--/-7,- /-i- y - to .2 5 -'1 c H2S Measures. IB/Yes 0 No Directional Survey Req'd: Yes 0 No Spacing exception req'd: 0 Yes ('No inclination-only svy Req'd: 0 Yes I3'No APPROVED BY APPROVED BY )5/- -r - OMMISSIO�NER THE COMMISSION Date /23 -1_5- Form f -5 Form 10-401 Revised 10/2 12 ThOeRt is it f 4�i oaths fro tip date of approval(20 AAC 25.005(g)) Submit Form and Attach ants in Duplicate vri /a z,// 5- v ' ` 1 �J /'� . C� /-a-3-� .€ 13�� w.js To: Alaska Oil &Gas Conservation Commission From: J. Kyle Raese bp CTD Engineer t0,1 Date: January 15, 2015 Re: G-16B Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack lateral from well G-16A by the Nordic 2 Coiled Tubing Drilling rig on or around March 1, 2015. The G-16B sidetrack will perform a dual-string exit through the existing 3-1/2" tubing and 7" liner. Kick-off will occur in the Sag River formation and target Zone 1B reserves. The proposed sidetrack is a —2,850' horizontal Ivishak Zone 1B producer which will access a —35 acre reserves target southwest of G-Pad. The lateral will be completed with a 2-3/8" L-80 liner which will be cemented and perforated. Rig Work(scheduled to begin March 1, 2015) 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2,337 psi). 2. Pull TWC and kill well. 3. Mill 2.80"window and 10' of rathole. - 4. Drill build: 3.25" OH, 950' (16 deg DLS planned). 5. Drill lateral: 3.25" OH, 1900' (12 deg DLS planned). 6. Run 2-3/8" L-80 liner leaving TOL at—9325' MD. 7. Pump primary cement job: 16.7 bbls, 15.3 ppg, TOC at—9,325' MD.* 8. Perform liner cleanout(if necessary) and RPM/GR/CCL log. 9. Perform liner lap test. 10. Perforate —500' liner based on log interpretation. • 11. Freeze protect well to 2,500' TVDss. 12. Set TWC; RDMO. Post-Rig Work 1. V Pull TWC. 2. S Set 35 KB liner top packer.*Set generic GLVs. 3. T Test separator. *Approved alternate plug placement per 20 AAC 25.112(i) Mud Program: • Well kill: 8.4 ppg brine (627 psi over-balance) • Milling/drilling: 9.5 ppg PowerPro(1130 psi over-balance) Disposal: • All Class I & II non-hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or ' Pad 3 at DS 6. • Fluids >1% hydrocarbons or flammables must go to Pad 3. • Fluids >15%solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >11 must go to GNI. Hole Size: • 3.25" from 9,375' MD to 12,225' MD - Liner Program: • • 2-3/8", 4.7 lb/ft, L-80, TH 511 liner with cementralizers 9,325' MD - 12,225' MD • A minimum of 16.7 bbls of 15.3 ppg cement will be used for liner cementing (TOC 9,325' MD). • The primary barrier for this operation is a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional: • See attached directional plan. Maximum planned hole angle is 97°. Inclination at kick off point is 21°. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property—20,075'. • Distance to nearest well within pool—460'. Logging: • MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section. • Cased hole GR/CCL/RPM logs will be run. Perforating: • 1.56" HSD 1606 PJ HMX, 6 spf perf guns, 1" CSH work string &2-1/16" CSH. • The primary barrier for this operation is a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti-Collision Failures: • D-07 Center to center: 1,168'—Abandoned leg • G-15C Center to center: 627' — Producer to be shut-in • G-16 Center to center: 0' — Parent wellbore at KOP • G-16A Center to center: 0' — Parent wellbore at KOP • G-21 Center to center: 24' — Producer(A/C failure occurs in abandoned section) • G-21 PB1 Center to center: 12' —Abandoned plugback Hazards: • G-Pad is not an H2S pad. • G-16A had 20 ppm H2S on 3/17/2014. • The lost circulation risk for G-16B is considered to be medium with two planned fault crossings. Reservoir Pressure: • The reservoir pressure on G-16B is expected to be 3,217 psi at 8,800' TVDss (7.03 ppg equivalent). • Maximum expected surface pressure with gas (0.10'psi/ft) to surface is 2,337 psi. • An EMW of 8.4 ppg for this well will provide 7 psi over-balance to the reservoir. I • rvQ Kyle Raese '—oho- L 3 j CC: Well File CTD Engineer eqb 3 a Q. t'OG'' r'- Joseph 7.*3 ()P9s , rs 6364 e4.0 sP 3.33 “ ELLHEAD= CM �TIaATOR BAKEtZ C PROPOS _, G �1 6 B I SAFETY :fes WELL ANG "CHROMETBG^-MAX 3. LEV= 77.08' I III =.REV= 41.53' j 2215' H4-1/2"HES X NP,D=3.813" 3500' _"COnDUCTOR, H ? L ix Angle= _"@ - itum M3= 9831' -, itum TVD= 8800'SS ID= A GAS LFT MANDRELS 7"BKR LNR TE BACK,D=7.50" -{ 1993' ST MD TVD DEV TYPE VLV LATCH PORT DATE 3 3286 3285 5 KBG-2 MY BK 0 05/26/11 9-5/8"X 7"ZXP LIP W/HGR,D=6.276" 2004' 2 7179 6503 35 KBG-2 OMY BK 0 05/26/11 •./, 1 8467 7620 25 KBG-2 DMY BK 0 10/05/02 9-5/8"DV PACKER -1 2585' ; - \------{ 8536' H4-1/2"HES X NP,D=3.813" 13-3/8"CSG,72#,N-80,D=12.347" -1_ 2684' 10.14,1 it II 11. Minimum ID = 1.78" cl : 8557' HT X 4-112"BKR S-3PKR,D=3.875" WIPER PLUG BUSHING IN DEPLOY SLV ill 8669' H4-1/2"I-ESXNP,D=3.813" 7"LNR,26#,L-80 BTC,.038.3 bpf, D=6.276' -1 8678' 74 5-1/2"TBG,17#,L-80 BTC,.0232 bpf,D=4.892" -1 8700' i, al 8678' 1-17;-'X 5-1/2"XO,D=4.892" 4-1/2"TBG,12.6#,13CR-80 VAM TOP, -1 8700' ►Y i 8700' -14-1/2"HALF MULESHOE,D=3.958" .0152 bpf,D=3.958" ,IK♦ < 8700' -15-1/2"X 4-1/2"XO,D=3.958" 4-1/2"SCAB LNC 12.6#,13CR-80 VAM TOP, - 8723' 0152bpf,D=3.958' • 8712' H4-1/2'HES XNP,D=3.813' • 4-1/2"TBG CUT(07/10/03) -1 8735' .I.4f ,; 8730' H 9-5M"X 7"UNIQUE MACHINE OVERSHOT 1 M M 8761' H4-1/2"X 7"TBG XO,D=3.958" ��� ��� 8761' _-19-5/8"X 5-1/2"SBR D= 4-1/2"TBG,12.6#,L-80,.0152 bpf,D=3.958" H 8795' 7' I7• ,♦ 0, 8789' 9-5/8"X 4-1/2"OTIS RH PKR,D=3.93" I II TOP OF 7"LNR 8853' �'♦' 8795' -14 112"X 3-1/T XO,D=2.992" V 8853' H 9-5/8"X 7"BOT LNR PKR,D= %TOP OF 2-318"LNR(CEMENTS)) 9325 1i �►! L 9325 -12.70"BKR DEPLOY SLV,D=2.25" %, ; I r„ WF E R PLUG BUSTING @_',D=1.78" STN 9-5/8"CSG,47#,L-80 BUTT,D=8.681' -1 9347' :r♦' 3-1/2"TBG,9.2#,L-80 8RD,.0087 bpf,D=2.992" -1 -9375I��� MilOUT WINDOW(x'166) -9375'--9385' • 3-1/2"MDNOBORE WHPSTOCK(0X/XX/15) -9375 I►-':0 N. ' . 7"LNR 26#,L-80 BUTT,.0383 bpf,D=6.276" -{ -9375 . t,� i�`.1 �♦+. H 2-318"PUP JONTw/RA TAl :IU I ` �. PERFORATION SUMMARY I LOG: ON XX/)OV15 `•♦♦! w'•�' ANGLE AT TOP PERF: @ '�� H PBTD Mite:ReferR-oduction DB for historical perf data �'•� Nob ., '♦4, SIZE SPF NTERVAL OPN/SQZ SHOT SQZ ♦.•` ��.`. 2-3/8" LIR, #,L-80 TH511, -12225 ♦*C�s .0039 bpf,0=1.995" DATE REV BY COM E NITS GATE REV BY COMMENTS FRUDHOE BAY UNT 10/14/81 ORIGINAL COMPLETION 12/17/14 PJC FINALIZE PROPOSAL WELL: G-16B 02/13/88 NI ES RWO PERMIT No: 10/05/03 N3ES RWO API Pb: 50-029-20643-02 06/18/09 NORDIC1 CTD SIDETRACK(G-16A) SEC 12,T11 N,R13E, 1865'FSL&2277'FW XXIXXII5 NORDIC CTD SIDETRACK(G-16B) 112/10/14 PJC PROPOSAL BULT BP Exploration(Alaska) • W_ mu, #.,,W az m W z a m t 0 J 0. Q � I ce co BMW ._ n. e3 a `� Q m = N CO 41 CO 0 .W ig oar t7 0 Si r ' co O O (1' w r r Z & thth a CO 1111 N '_ co 02011 I 'o `Wn Z >go O > u) m co P ICZ m (� N p 0co O O O cci W ,_ co O 0 Z coCo r Co h - 0 V f/) Z p on a 0 t 0 0 • . O rx a vw a (D _( 0, 7 Y N O 7 03 U N O j 0 j N V O it Y O© Eit 6 co N O N Ili d > 2 O I- W MD D 123 7 61C p d '00 C CO03 J-1 -1 C o 7 p(-) 0 2 o J J 0o) .a. Q a) C 3 O) C R E N E C 7 7 'a.. 'O O C ._ C) j0 0 p Q d w 16 ci === IL O V y T R 7 7 C o C 0ce 0 L Ts c a T W M 00 ,, O) `° O J Z O M O O 7 c c .... CO co co O O N O t CO 0 O O _0 O 00) CCD CO N N a) U) 6 '.. N W Ce U I00) t0 C.•. CL c _a .E • C = a) H I 0 c 0 0 0 o0 0) N a 7�'i d I- `- O N CO C a R a 0)), 0 c a`0i co Q. 0 z° w ml c m 0 c" Z w 3 8 9 F o . O Z , z 5 a so a0 ) N w W O O O g a) u) p 0. 0 a N0 E I a £ g 0 a a0 m Z cM = = U. m a �x O - C. > > > w r-Z co 0 0 0 m ( m NO p o00l c as (� O O O N O Q L cT- C Q O d O m CO m -0 CO Z 0) �'. 0 CO CO Z 0 ' CO co I"- 7 a- C m 0 c� m d �N N d n C7 U a m 10 NCO .d O Oma) O co 0 E m m aY 2 I 9 3 f oC9mmm CO zu7 � E c u 10 Q E .-c°. c o c w C N c in C c O co0 •;-; _ O C v T N O O O _ O r O .d 0 Z C �0 n O. d .a 6) y N O N a = a a C 01 _O p E O` w 0) 0) a) `O 10 d l0 0. r r O 5 O) O) N O) A N L t' 0 a. co 0 a 2 0 2 in Fs u. a. 3 3 a. 3 2 0 < > > ( ® h O 0 O O 0 0 CO 0 0 0 0 0 Co O co iii cc co o O O 0 0 O '- 0 0 o O O O a `W= 0 0) 0 0 0 o c0 o O O O o 0 0 0 v o co co CO anomo d 03 F `* o Z co co a co 0 sr N O n 0 co n n v n N- 0) CO Cr) a Z n N 00 In CO CO 0) c[) 40 CO (O LO 0 Q M n (O In N o N V c0 M O) 0) N Z O D) 0) 0) 0) 0) co co 0) O N CO CO 0) M O U CO CO CO CO co CO CO CO CO st NT st st O 0 R N 3 2a > -- N 7 co OiR co c) f0 v) Cu 0 Z Q 0 CO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N 0 O O O O O O O O O O O O n (-) O '- O O 0) coc0 cc0 co c0 (D (D c0 c0 (46 f0 co a) © E iY m E 0 3 (h 1) — mY 0) -- 2 _.jc m m0 2 C 0 CI,S) 52OF- mow G) 0) 0) o sr co c0 n O N st 0 LO U) U 'C 4) N LO O CO CD V CO N CO N N CO 0) N co V o O 1() n '- O O M Si M cO ` .0 O W n n U) U) CO N O 0) W n U) 00)_ cD c1) to LO 1n U) co (O 1C) LO V v' V st d 0 C =' V . ,. NF V V V sr- - st s s NI: Cv 0 N co co cn O LO LO 10 u) O O U) In la c() U) C t O O f0 CO O CO CD CO O CO CO CD CO O CO c) p W co 6 C d • U.O w U d C 3 j 8 C C C.) E co 0) co N 00 CO M N N CO n 1() U) o d ` co o Cl N co '— '— ' 8) 0) Co n CD CO N O O 2 d co O 0 >, O O 4 Ni N (O M O c0 c)) cO 0) .— 'C (.) 0) — Et T c6 0 p) in co co co co c17 NI- st CO N O) n M CO �' d t 0) .0 C n n n n n n n n n n CD CD CO CO LC) i 1 C.) 0 ' :° co) t N (O c0 COoCO0CO co' cUo CD COD COD (OD (OD COO cUD cUD 0 - 2 2(! O m O1 a) m co a) 03 m 0) CD CD 0) 0) 0) 0) a) C m C 2 O c(') 10 1.6 U) c!i La. cC) O tri 1. 1. It) 1. U) o S co `o 'a in O' ▪ c CO (D (D M CO (0 0at V- 0) N f0 CO c0 U CI > M O (O O CO 0) N CO e- O) M 0) 0) Ct d d> 0 to CD N O O M 0 O N o 0 c0 aI O co 2 (O co 0) O) co sr co co n N- 0) O CO co co co n N n n n n n n n CO CO QeN N N N N ( ci N• N N11 N N N N N W 7 3 I— v O 0 CL 0 COOcoN LI) v 0 cCMi• OO) COnn ((n° n (MD a co m d Q' o N N � O O) N V cd 0) 0) 10 M O y E > 0) 0 O O co 0 0 NN In n sr 0) tn to 0 M `7 sr srs! st sr V 'LT 141- st u) u) 10 CO ZU) To Z y H m 2 sr n O stn N0) st O to n N0 10 0 O c0 in V M _ 0 U) 0 (O O _ CO N _ O LL) co M O W IC) In 0) M 0) O O (' O n 0) 0) co 0) CD CO N CO n _ LC, CO N (/) M M M co 1l7 c0 OD CD n co co co O) coO W W c0 W o W W o 0 0 W O 0 O c C E j � D >>. 0) cn CO CD O O CO CO CO CO CO CO CO N 0) 0) 0) 0) 0) 0) O) 0) e 0M M M M 0) CD O Cn c0 o c0 o c0 c0 p co O co (O CO CD O Y) V• O) 0) 0) 0) 0) 0) 0) .c cn N N N N N N N N a- a- '— a- a- a- 1- o a,R...3 CO Ni- m nC 5 - z (� Q w � C7 � CONCON0 o CO rn � co 4co r 0 0 N N O o O 0) N O O N O V sr O O co n CO co O N CO LO CO >` O to ▪ c0 O N U.-. co m -0 03 0 y Cr) N C 9.,. Q O Cl.co 0 ~r3.. 0 a- • CO CO O m 0 1- ua O O CO CU 0 0 Z Z a a 0 0 0 a 0 0 0 O o 0 0 0 0 o 0 0 0 O o O O O T O 0 O 0 O O O O O 0 O O 0 0 O 1 in 0. cc cc tO c0 cO O O O ccO O O O O O O O O a• on 0) O n O N- 0 0) 0 0 V 0 a O 1 0 0. O — M 3 co C7 a CO v_ v_ cO LO CO CD N- CO CO 0) 0) O (V _0 c ` 0 3 °) D y Di a Di O ai (/�0 0 of of 0) rn of 0) 0) of of o •- 0.2 ii _ O c o, 1.1- .. �- c 13 2: H Y a N co N. ao 0 0 m a p) CO d d .3 3 03 Ui Udti) 0 Cl) 0. VN- O n v o 0 1, CO v 0 0) 1- v o a) co UI 0 0 0 0 N. u) O CO a) a) o) o o) O CO O 0) O CO 0 a) D i��= 0 0 0 0 cci v o ai ai O ai o of of ai o m of ai o ai `Wb rn ao co ao co co co ao rn m co co rn ao m m�2 '.;1' 0 _ r' Iv- 0 F o Z `) O O N a) CO u) M CO V 7 M CD 0 N 0 0 CO co n Q Z co ,- N CO O V co V M ,- a) Nr t` .- M N. N O 4- CO V a Q CO M O a7 N 44 M cc; M N- N M V' 1` co u) u) CO N S2 O O W O CO co Cn to N co CO in CO 1--.. V '7 V CO V' V to CD CD CO N. 1. CO O O O O _ N N M M V CO CO CO OU lUE. CD = N co N O y O j ca R co (n c7 0 Z Q O 0 0 0 O O O O O O O O O O O O O O O O O 7 O O O O O O O O O O O O O O O O O O O O O co R r 0 Y ' CD CD CD CD (O CO N N N N N N N N N N N N N N N m E in 7 r r r r r r r r r r r r r r ch - co Y a) 2 J 0 ) CC ` c p 0 o >a) a2 O i- w ... y co co N N N. CO M CD 47 N 0 M) N N. h CO V a) u) - C.) .a co O 1. .- M ‘-- a) u) O 0) CD CO N N. CO co 4 co . M O 0 N a) O N CO 4 CO CD u) CO 4 N N CN.a) O CO co 0 .- N. 0) L co N a) CO 1. 1- N- a) N CO V CO 0 CO 1. 0 N M a) a) co_ t1 a co co co co co co 4 V V u) CO CO u) to u) CO CD CD ttco N CO CO in CO u) V) Cr) )r) CO CO CO CO CO u) CO CO CC) CC) Cf) CO CO C ezi 7.. CO CO CD CD CD CO CD CO CO CD CD CD CD CO CO CO CO CO CO CO (O « O W la d«. C• V 0f C R 10 C p C 0 0 CO 0 CD CO CO O ' u) O (D N. N CO N C11 CO CO CO N Q CY w R O 1-• CO CO CO CO r s- co CO O O CO 4- N co CO CO CO )O u) p .� Cy d V C!) • u) r O v n )17 N N. O_ CD CD .- co N CO O O d .c R 01^ V M CO N N in co in 4- O O 01 co 0)) CO co r 1- CD N V Nr *0 D ce 00 CD :Tr r - m co co co CO co co o co ui u) ui ui in U) u) cn In cn po > G O 7 R L+ Cl) CO CO CO CO CD CD co O co co co CD CD CO CO CO O CD O co CO J ~ Z fn D O O a) co 0) O) a) O) O) a) O) a) a) a) CO O) CO CO O) O) O) O) Z u) u) CC) Cn Cn Cn CI) 1 in u) u) u) CC) ui Cn Cn in u) u) CO 1.6 t 0 a) CO CO N CD CO CO Q) CO a) 0 N. N Cl CO O CO O 0 N CO CO CO O co )n co co CO CO N. 1 4- CO 4- 4- co Cr c6 n O 1. • 1- 1- co O N ai O C0 1- ✓ N. CO O O 0 CO CD u) 0 CO 1- N. CO M 0N- u) O N- O a) c0 CO CO CO 0) O) a) co co co co CO N. N. N N. N. N. CD co CO QCO N N N N N N N N N N N N N N ciN ciN ciN ciN 7 - O V 1- CO N_ N. 0) W V CO N O u) N. CO u) u) O u) CO a C) 0 a? -- ,- 0) co a) co O in M CO N CO V co CO Nr CO O W u) OO N N. u) u) CO N. V a) O4 N4 Ca h O 0 CO 1- n 0) CO 0) CO CD CO CO N. _ 4 CO O Tr 1- co CO a) 71 CD CO n N. co co a) O N co co V - u) CO CO CD N. R Cl)N , N N N N Ni. N N N N N N N N N O Z 0 O a) a) CO V) CO CO N CD CO N CO N- CD CD CO 0 4:1- CO CO 1- in CO ' co co co CO O V" u) CO COO N N O O V O O O O O O O O O O O O O CO u) CD CO Cn u) Li) CO CO CO CO CO CO CO CD CD CO CO CO CO CD Na) a) 0 a) O O co a) a) O) CO CO 0) O) O) O) O) a) a) a) a) ',.. 0 N c0 CA O O c0 00 cO c0 cO cO 00 c0 05 CO c0 cD c0 CO c0 c0 00 "' co co co CO CD N N N N N NNNN N N N N N N N O O O CO O CO CO CO Cl CO u) 1` 1\ r- in M M C? CO M CO CO CO O cO 1D U) u) M O O N. O CO CO O Si O O co) O O O CO 1-- CO U)u) u) 'V CO 1- 1� 1-- O O V' a M ,- 0- CO U) CO ; V ON CO u) CO CO CD r r N. CO CO 0) 0) 0 0 Q co co co O O co co O co co CO W CO co O O c.6D O O O O O O O O O O O O O O O O co N N- O O CO CO CO CO OD OD c0 c0 O 00 Ca CO CO CO CO W CJ N 2_ # V N co -0 co C o < 0co 0_-c com m r• Jco CO CD CO III Z d n. 0 C7 0 o o o o 0 o J o o o 0 o 0 o o 0 0 0 o 0 0 o m O o 0 o 0 o p 0 !n 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o ui o ui w o o ori o cri 0 o ui cri 6 0 0 o 1.6o v O O O N O N 0 0 0 N. 0 0 0 N CO 0 0 0 N. 0 !O O. 7 O ' N N CO CO .OV- CC) u) CD CO N- c0 co co O O N ' T 0i to O ' O O O O O O O C O O O N O O O O O C,.)O O a N in 0 R .1; - O c d O) r W r r O O a O) c O • o c u�7) d o Ua V) � � 0 a 11 III N O 0 CO CD CD 0 0) 0 CD DO 0 O N- CD 0 0 CO NCO W CO O O) O) O) O 0) Q) O O O O) Q) C) 0 0 O) O) W b of o of O) of o 0i ai of ai o of ai ai o o ai ai a ' CD O co co o rn m aD oD aD rn oD aD coO O co co d m ci Z U co O N. CO N O co N- N LO r N U) CD `- N N Z 0 0) O c0 N co C') N OD st co O co N .- co O c Q CD Ln 0 Ln U) LO CO 0 a0 N O N N O h C co co M CD 0 CO M O M LO N CO M LO CD N 0 N V CON- CO CO O O O N N M CO M V U) in Q NN e- _ ,_ N N c4 N N N N N N N N N a -- co = N CO _ CO 7 Y O C0 co N CO 1 - )O • Z Q 0 0 0 0 0 0 0 0 O 0 0 0 0 co O co co O 1 3 0 0 0 O O O O O co O O O O co co O O co N C••) N N N N N N N N N N N N N N N N N N — C — CY N .c J 50 2 O 1 w o 0 hi O O O O OO CD V CO O O M N O CD L.) i O co N N- CO •c- CD a) e- r sr O st M LO N. N O O O [7D • O O N O) N M O CO ai V 05 M M _ in O st LO (--- CO N CO N. Cr) In CO CO N M N M d' 41 0) CD N r N- r N- Co co co co a) O O .- N M M d o C•�' V V' •1 V 4. V V V LO LO In CO Ln In i 0 in in U) CO U) U7 U) Ln in In U7 LO LO U) In Ln In LO a' ` CD CO O CD CD CO CD O CD CD CD CD CD CD CD CD CO CD .dO W . 6 :+ C C O 16 :a C V d 3 C 0 Nr CO CO CD St N In 0 N. CO Cr) CO 0 O) st C) w ld ••• O N CD CO C+) Ln N 44 W 4 co co V co N 4 n O •,- a) d O CD Lci N- 4 .- N O O in M M U) M N O C) G) w LL T ma1 N CO r U) O O N O st O (. CD CD N N CO ix O = 0 a 0Nt M N N N O O 0 O O co W a0 a0 O n ti OGC o = CcS � SSSS � S J y CD O Co CDO V O co co O CD CD CDCD O O O O CD CD CDCD a? O O O O D D D O O) co O O) O 2 CO O U) n UULn U) ULn n Ln Ln Ln L) Ln in Ln 6 idZ L 0 a) O CO N N- st NI- N st 'd' O4 V' CO NO CD O a st CO O O NI- CD N O U) O O N re N CO N M • M Ln s}' W In CO O CO M C) O a1 st O LnM N W st N If) N N N W Cl) N O U) 11) Ln CO Ln •V NI- 4 co N N 7 •- 0 OO a. 15 O N N N N N N N N N N N 0. N N ciN CO n 7 I — 0 0 N NI- O CO N CD CO CD st CO N 0 CD NI- N 117 00 V O V. a Ln N CD Ln 0 O CO O O N h Lo in st N O O co O MN N- co V CO 4O a) _ co O co O '1' ti N M LO CO N N O 0 0 - O) f� f� co O O co O N N N cocoM M st r r r CO (q y N N N N N N C•7 C7 Ch Com) C7 c' M M M M C? M Z p N N 0 st co N CO 0 O N a0 V V CD CD O N V• CD CO N- (-- a? O O O — co co 4 St U) CD CD N N N N N N N N N N N CD CD CD CD CD co CO CD CD CO CO CD O CO CD CO CO CO U) 0 0 0 0 0 0) 0 0 O 0 0 0 0 CO 0 0 0 0 CO y c O CC CA CID OO CD O a0 aD O O CD (ID aD 00 Cb O N N N N N N N N N N N N N N N N N N O Ln LO Ln O MM M CO O M M M O In U) LO Ln O M CO CO M N O (D N I1) O M V CD CO M sf U) CO CD CD U) St M M N 0 O O N CO Y CO 0 0 0 N N N N CO CO CO CO V V Q O O O O O O O O O O O O O O O CO O O O O O O O O O O O O O O O O O O O O co CO co CO O W W Cp co co m W Cb CID CD O W CC U N->. C 03 Nm -O C Co E O CO a -O a3 03 1 C7 CD CD Cfl O 2 mV7 Z a_ a 0• 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o N O O O O O O co O O O O co O O O O O O N t O O O LO O O O 11) O O O O O In O O O In Q N O O N N co O N co N O O U) O O O co NU) Q 3 N M ..:I• st NI- U) CD CD N N CD O O O 0 •- N N RI �0 a ° aCC odOC i ` .+ N w CO v oN ain33o a 47 W13 W a �; 3 CO aZ ..... o CO o0 Z La a 0) U ¢ Z 4 Q Z 0 O U 0 cc a co = °' N - N 7 Y oa) m m - > o Z • JU a N co ca © jct � 0 a) f6 0) ._E 0 2OH W 0 U v c o of t a) m et c a) o o� 0000 {a a) .. N N O CD Cua) c = 4.) d M CD a^- C V y 7 S N 0 C M d C 5 o w 0 a) U N ❑ U a) w re >, N CI N O N- I- 2 z 0 c a N CO O CO c E C " N m . N o V v inN cC 0) a mTm I— oo to U J N m CL 0 0 N (0 co E E -000 t0 O CIS o a 0 O C N CO •Ct in CD N O 0 Q 0_ U H Y > V 0 CD r co co W I- Q 0 Q O E co cocoM U) V COV' N CON V coN V t0 Z V CO O r- CD N CO C CO CO "7 N — — co V Is — N u) N Cal 0 Cn O MN I: .— CD W N M V4 6 , = 000 N n co N c0 00 00 6) CD N I` CD U .7N0) y l] v N N N N N N N N N N N N N N N N N N • 0 t c •0 0 0 Q' 0 CD N N- LU M CD CD M )- c0 I� V N L0 Cn c0 O CK) c0 Z Nco co C[) V CD O in to co V c) co co V' ,— .— N 6) N J _ Cj W N V m V Q) M N CD m V' I� O M O _ 00 m O 0 o O N I-- - Oc0 u)O 6) M CD M CO O CO 0) co 0 . r M V V V' V V 4 CD CD r co co CD co O N 01* c-;') O CO Z v N N N N N O) 0? 0 N N + CL CO 0) N O CD 0) CD Q N = N N tD Y U Q.= M M 0 V' I,- O N 6) o N )D O 6) M CD a0 o O V' N CD W O (D (D CD V co. O co <-- N CO. Cf) co V O N CD O co. Co oN- co N tN.7 L O co Cf) 0 CO CD V' V 0) 0) o N N N Q > ❑ t 0 N• N C)) V COD N ao COO0) rn 0) rn rn 0) rn rn rn rn DC0) a) 0 0 co- cd cd cd cc; 0o co- eo eo co ao co- co- cd m cd co- ao co U > O co O co O O E co N ci ca � t N -a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 < o d 7 0. N ,— O co O O O O O O O O O O O O O O O o 0 0 0 L -C C7 CO CmO 000 R 0 2 N N t • O Ct) Cn Cn CD O O O O CC) CD CD CD O CD Lt) CD O In L 0 7 a O (` 6) N N O V' V CO N N N N O N N LO N O E co 7 N a) y co M M V in co co 6) o N CO L) co V Co 6) N Z d d C7 C7 co c y p �. m m m m m rn rn rn o 0 0 0 0 N o N V c N CO Ct) CVT 0 0 "1:3a c U) .+rov ca o c ca c Y `n %r o 2 N N N a) 5 N L U a o o 0 a 0 W T lii °A ,s-1 g 111111 _ d1! ® § s 5 H N G i s z �+ 8 �1.;P 8 �We�� � * �s.aos $� ! 3 r.aa�� � � m BA m 1 i MI 8 8 6 gm S I a � m g 4 o O aa c5 g ea g o au .8 g 8 g 8 8 g Ili s g 8 g g g o S ~ (u%8 00Z)(+)iNoN%(-)IPOS� �Ju a R C O tk ,I,P;t- i -, : ,8 6) 1- wJ ca N gr ,mmommmommommomoosoo ^m �IIIHN6EFF'0e�M § :#).2m ...mom s F F 2; $ go 0 9 am mem e -gr g tfle3.ne m.P 'ogee rn IL a �n g' 'S12MAv.nmgm m.nm = IIMPIPV. low.o ................... mo888 m888 9m8888g8 -a---„�- ��� ---__� _ . m ' : o 80�40008oSeS88S$8888 e\ $ - lz no-mmmm.m.om.orr �rrr u 3 �. I 6 w d a `mR�.mm .'Si Mm" I ` ' w s ommnmmmmMmrmNN -mm mmEEssEEEMEmmmm s FR EV .2P-'222NMER2M22EAL%22 .T, 22 G. 2M.S mmmmmLT.TWAmrio.; s CI n ,� � _ _—mmmmmmmmmOE T' - - y o.0 0 o 8 o s 8 8 o 8 8 8�8c'o ZIM MPImENv. mmmmmmmmo000o -wnmmm.-cgm,.+m,mmNg Q W Q Q S = a 0 0 (u/gsn 000 ydoG Iea! A ankL mVJN0 h W ,NIOp0 G II z' 285 z a 0 ��pO- ■ ---Li\ .O a —f o d€ �^� Col 1 o / I I I i 1 IN . 0-d, — crcecccri Kr ofN N 9] m IIE N 7.a rs;. o g g� a 8 . g;co °_, 7x 1 110°P Ali , , , ,w „s, 0 3F � � o m c 7.1 O fiNgi _ -9q� ,` JAI 956 a „,„ il QSZIA III r , ,,,,. N o ill A 1 )k1 �6111 ■■_\ i dad ,8 4,. 8 i li ,....„ . 4., N v • �r 4.': 4 8 748 6\ :442 i — —Pi § s § __14r7 b s a g s - - 8 - s s § 874 Flm . PT a s m 1(:› (u!/$sn 00 I)(+) oJ(-)43nosm m i tit 42 * 2 0 _ S 8_ Q m 5 N N Qmgn ,0CIA 4.WF OHH ; > 6 S . > m6J > .N1H `s ° m . . . . .a. c _ 6N m 4 $ h6t-- 6hm5 � _ 63m, _ ,_e __ hmTf: nm * OmOiOW NZ g £ N N gg rvrn 66666666666666677th f iSo�mmeene�6mHNrNnN �. � U Yw 3 aBwz 5b56 ucb55e5ue 5V56ehhhwg^m'8em�nu:emry 2 m • • • + • • i . ii 4m � Na mg g g9 w z ' "mtie"'88 m 8x� sal J 1 Li i--' Messsee6.'17.al,''''mbbl�1a 1113 9 > 3 5 5 > S 3 5 S 3 9 3 � ch $ dd2 gh ��, eTi' hcc � cc � cc c$ 4 � $....--......w., foo 60 d_ d ao a ® cc2ddd66666666666eA2 , gg �s g$ Egg • ; ; 22ddc5chchc5chchc5ch6 6chchch x in€li ngumoglm m`gm o_n $ i • / , 1 4 $ 4 4 1 $ 4 • t 1 0 lii ii NH rvminrtactmmmmmmmm 'Zi m 5 R8,888N88888888888888 g �_ mvwtormWo.-rm<ulm,mm 8 9. is 0 0 .00 8 8 o cgz;r- LL _ 69,.a E =_=�\ \\ g!`47:61 W m Ir- u0'l Ori R \ \ \ E ”;T; ,„7/, . „o\\c)\, =-..r.-.....-"•.•..-`4.......,._•••.•...,_ . o ' ' 4 -- ,., \ _ :=-......-.. 4: . (2 2 L.,i§ 4044".- _ , =_,......,......... ......._,........ .„‘ .\ O mEm � = \ * / :„: _,.,.:." ,_ : \ ..§ .'c'e' 40 / *A.& '' • . , - . � i a) O O O O - O O O O `/O .p O O c� m r 0 0 0 0 d 0 0 0 in u, r- /m co 0 0 O N N •- ,- , m r h co OSB to r m .-j / N N m ��\ 6: 8 / i/ / � N m y m S N � -to `S 'Z L 2m 6. aa= ._. 2C� r 0 O Z 7--. o (5 y\ �`- ID P1\\ `0 - - ------"4••••--•....' "•-•-•..-I--- NN _,___ m N N N gi O N N N t*'4fr North America - ALASKA - BP Prudhoe Bay PB G Pad G-16 500292064300 G-16B G-16B Plan#7 Travelling Cylinder Report 15 January, 2015 BAKER HUGHES INTEQ BP NM 0R by Travelling Cylinder Report HUGIHES INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-16-Slot 16 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB G Pad MD Reference: ORKB @ 77.08usft Site Error: 0.00 usft North Reference: True Reference Well: G-16 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore G-16B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: G-16B Plan#7 Offset TVD Reference: Offset Datum Reference G-16B Plan#7 Filter type: GLOBAL FILTER APPLIED:All weilpaths within 200'+100/1000 of refen Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 9,300.00 to 12,225.00usft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,418.80 us Error Surface: Elliptical Conic Survey Tool Program Date 1/14/2015 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 9,300.00 1 :Sperry-Sun BOSS gyro multi(G-16) BOSS-GYRO Sperry-Sun BOSS gyro multishot 9,300.00 12,225.00 G-16B Plan#7(G-16B) MWD MWD-Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 110.00 32.92 20" 20.000 36.000 2,684.00 2,606.80 13 3/8" 13.375 17.500 12,225.00 8,962.69 2-3/8"LNR 2.375 3.250 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB D Pad D-07-D-07-D-07 11,000.00 12,445.00 1,168.71 13.37 1,161.60 Pass-Minor 1/10 ---- D-25 '-`D-25-D-25-D-25 11,975.00 10,970.00 472.66 418.62 58.41 Pass-Major Risk D-25-D-25A-D-25A 11,914.52 10,900.00 491.87 388.08 107.35 Pass-Major Risk D-28-D-28B-D-28B 11,720.00 12,775.00 925.02 259.24 665.88 Pass-Major Risk PB G Pad G-10-G-10-G-10 9,750.00 10,100.00 966.25 904.93 377.24 Pass-Major Risk G-10-G-10A-G-10A Out of range G-10-G-10B-G-10B 9,694.55 11,241.00 1,388.30 801.47 733.43 Pass-Major Risk G-11-G-11-G-11 Out of range G-11-G-11A-G-11A Out of range G-11-G-11 B-G-11 B 9,806.36 10,925.00 1,383.90 1,020.75 533.88 Pass-Major Risk G-14-G-14-G-14 Out of range G-14-G-14A-G-14A Out of range G-14-G-14B-G-14B Out of range G-14-G-14C-G-14C Out of range G-14-G-14CPB1 -G-14CPB1 Out of range G-15-G-15-G-15 9,305.22 9,225.00 1,197.44 887.39 325.22 Pass-Major Risk G-15-G-15A-G-15A 9,305.22 9,225.00 1,197.44 887.39 325.22 Pass-Major Risk G-15-G-15B-G-15B 9,305.22 9,225.00 1,197.44 887.39 325.22 Pass-Major Risk G-15-G-15C-G-15C 9,760.04 11,025.00 627.36 3.07 624.36 Pass-Minor 1/10 G-16-G-16-G-16 9,399.99 9,400.00 0.43 1.02 -0.56 FAIL-NOERRORS G-16-G-16A-G-16A 9,399.99 9,400.00 0.43 1.02 -0.56 FAIL-NOERRORS _, G-18-G-18B-G-18B Out of range G-19-G-19-G-19 Out of range G-19-G-19A-G-19A Out of range G-19-G-19B-G-19B 9,867.96 13,692.00 687.25 552.01 179.93 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/15/2015 1:24:00PM Page 2 COMPASS 5000.1 Build 61 •10 BP rG.11III 0 by Travelling Cylinder Report BAR HUGHES INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well G-16-Slot 16 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB G Pad MD Reference: ORKB @ 77.08usft Site Error: 0.00 usft North Reference: True Reference Well: G-16 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore G-16B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: G-16B Plan#7 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name• Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB G Pad G-21 -G-21 -G-21 10,648.76 11,425.00 24.28 1.62 23.85 Pass-Minor 1/10 "- G-21 -G-21 PB1 -G-21 PB1 10,617.12 11,425.00 12.84 2.15 12.61 Pass-NOERRORS G-27-G-27A-G-27A 11,450.00 12,700.00 464.11 227.18 249.02 Pass-Major Risk Offset Design PB D Pad- D-07-D-07-D-07 Offset Site Error: 0.00 usft Survey Program: 100-CB-GYRO-MS Rule Assigned:Minor 1/10 Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NI-S +EI-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (in) (usft) (usft) (usft) 11,000.00 8,960.86 12,300.00 8,872.08 142.01 473.46 -110.74 -2,932.23 -3,947.99 5.125 1,256.68 13.37 1,250.49 Pass-Minor 1/10 11,000.00 8,960.86 12,325.00 8,889.35 142.01 474.49 -109.99 -2,918.03 -3,936.82 5.125 1,240.60 13.37 1,234.27 Pass-Minor 1/10 11,000.00 8,960.86 12,350.00 8,906.74 142.01 475.53 -109.22 -2,903.90 -3,925.73 5.125 1,224.92 13.37 1,218.43 Pass-Minor l/10 11,000.00 8,960.86 12,375.00 8,924.24 142.01 476.56 -108.42 -2,889.85 -3,914.71 5.125 1,209.64 13.37 1,203.00 Pass-Minor 1/10 11,000.00 8,960.86 12,400.00 8,941.76 142.01 477.59 -107.60 -2,875.81 -3,903.70 5.125 1,194.71 13.37 1,187.91 Pass-Minor 1/10 11,000.00 8,960.86 12,425.00 8,959.28 142.01 478.62 -106.76 -2,861.78 -3,892.70 5.125 1,180.13 13.37 1,173.15 Pass-Minor 1/10 11,000.00 8,960.86 12,445.00 8,973.30 142.01 479.45 -106.07 -2,850.56 -3,883.90 5.125 1,168.71 13.37 1,161.60 Pass-Minor 1/10,CC,ES,. 11,011.39 8,960.88 12,275.00 8,854.89 142.01 472.41 -112.83 -2,946.48 -3,959.23 5.125 1,272.92 13.40 1,266.83 Pass-Minor l/10 11,014.11 8,960.89 12,250.00 8,837.73 142.01 471.36 -113.86 -2,960.74 -3,970.53 5.125 1,289.58 13.41 1,283.61 Pass-Minor 1/10 11,025.00 8,960.91 12,075.00 8,718.97 142.02 464.03 -119.54 -3,060.60 -4,051.43 5.125 1,414.15 13.43 1,409.05 Pass-Minor l/10 11,025.00 8,960.91 12,100.00 8,735.78 142.02 465.08 -118.97 -3,046.34 -4,039.64 5.125 1,395.53 13.43 1,390.31 Pass-Minor 1/10 11,025.00 8,960.91 12,125.00 8,752.64 142.02 466.12 -118.38 -3,032.07 -4,027.93 5.125 1,377.17 13.43 1,371.82 Pass-Minor 1/10 11,025.00 8,960.91 12,150.00 8,769.56 142.02 467.16 -117.78 -3,017.81 -4,016.30 5.125 1,359.09 13.43 1,353.61 Pass-Minor 1/10 11,025.00 8,960.91 12,175.00 8,786.53 142.02 468.21 -117.15 -3,003.54 -4,004.74 5.125 1,341.30 13.43 1,335.69 Pass-Minor 1/10 11,025.00 8,960.91 12,200.00 8,803.55 142.02 469.26 -116.51 -2,989.27 -3,993.28 5.125 1,323.81 13.43 1,318.07 Pass-Minor 1/10 11,025.00 8,960.91 12,225.00 8,820.62 142.02 470.31 -115.85 -2,975.00 -3,981.87 5.125 1,306.63 13.43 1,300.75 Pass-Minor 1/10 CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 1/15/2015 1:24:00PM Page 3 COMPASS 5000.1 Build 61 I4 341 I ciiir 14, 1 I 1 It 1 1 0 I h' _ - I U . I i.., is °x _ I Uf U���' 1 ...JUL_ .n I Jt( 174 i I ♦ YI ui } ♦1 1 ♦ R¢ r::• ' i . : . : \: • �� `I I 1 ,17. Lr• i:_ ♦ • air 1 I 1 I a �wf, la ' 1 x • .4111111111111. I f q 2 I Y I I 1 I ! � .. 1 D U MitI II . I 1 LL -.w 1 f Q I o .. IfP. , i o 1.! I H �n I o,,,as.sse I U Q' . + I I \ vII x 'li UI I \ ` J ' I _ I \ 111: I ...... ;oh W \ 1 1111 W'11.1 S .4o. �•VII 1, x cry , f � op: II- w Alin I :.: O f li 8 �. W \ I f Y \ u n c' 1 ot s MI 1 ra Z—rl I I. : - t, & 't 1.4, 1 in mu 4v g Ce o _ _ _ -n. I " U [ I _ I Z ; 1 z ry in, 11 I `+ z m I s '' �7 8 f U 11 '- I - 1 v a I op:, =m E LL il o ce 1 I. 1 I,— _ . n W. S x 1 t 1 OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME: PTD: Development _Service _Exploratory Stratigraphic Test _Non-Conventional FIELD: Z e� � POOL: /1"-?-.71.A.6.<7. OOL: —tA.. �v.2 C�� C--)11 Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI LATERAL The permit is for a new wellbore segment of existing well Permit (If last two digits No. , API No. 50- - - - . in API number are Production should continue to be reported as a function of the original between 60-69) API number stated above. In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name Pilot Hole ( PH) and API number (50- - - - ) from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce / inject is contingent upon issuance of a Spacing Exception conservation order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: Production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application,the following well logs are Well Lo ,n also required for this well: gg g Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 4/2014 co o : : : a) 0_ : fn 0 El? 0 , , : • Q , c a) m' co j' .c a' E' (� ao, `o, a co . ; m. E Oo. c •c. O as v x CO COU o 0 : c : : -a I s: c(y a y mi, , , : c • , as . i N. m W .t-, 0 fa• �' N: E. 3. w. $ �' o a co , : m: O 7 co c7i SII p J UJ e' t. m. `� �� O' as. Z : co N d C dy g; a : O ,y 0 (/3 a : w : m ' 0' cd c�i : , �. : E a) 0 • 0 W Q' O, ' c' m: ca C'� •> 8 a a a rNY m' O' O t 2. m. L m, 3, �. o N w �: o a d a, iii, a' voi TO c. = o .N I' �: c • co , o Q al a) 3 OU. . . . . �, c CO . w ,mr, co, m a a ami m a). , OotS. p' . m' ,- co co > o y0 N � m O• O � V0.. • . • o . oZ _ -0o , � � � � oa3. . _. A' � . . N. . � N • • Z ' CO 0 O O v ' , ' ' ' ' ' ' 'O V) co . a`. . ix a. Q' g 2 I 0 d a , w > • ,, , w : 0 'Cr a a o co aai, aa)), N, CO). a), aUi, co aNi, Q, Q Q: Q, Q Q Q Q, 0, a), G 0`)), N Q a aai a aai aai N Q o a Q Q Q a z >- >- >- >- >- } } } } } } �- Z Z, z z 'z z z z, } }, } } } z >- >- >- >- >- >- z z >- z z z >, v' T a nriS : , : : : : : : E. : ay , . . . . . : : . . . . . . . , . M O U: Pi : c a m t, y. .3 1 c E � . L, o aCD0 `71- 0 3 : : : : c: . 0' a �, a o. . �. �. >: �. H 0 O r � y co, y y ° m, a a (n o- D �: N a d d Q: V) Id ! Of �: ajF. Ccop: d : r cr C y 0 O 'O U i ! 0I uy. a 43. 3• c2V9 m: ' o ry �' O �, y 0 °. CO •C .C' O) ° Z. a) a) 0' g O Cl)' C' O) L' c' Cl)' 7' Q '-' (' 0' Q' C°' v)' m' O) W Z •O' O' C' a' ' O' as c �� (a `a �. d C. m. m. p. O. Of a• L. c: G �. c p O ca M' •e N ' L' a) a • Q E: E' v: S c E @ �, o c w a H .. c ots' C: 4): w N t a = Y O O •O 0z. O' •d' c 0. 3 p CY la' a U p O N' co' ,,, >; c 0 0. D Q �' p O .O Y p' OO' �' m p E a) �: �: Q m m T O: rn d m UI a •c. 0 :d0. o, m. 0' �. O. : . as 3. , . 0 , a V, ._ ° O tiO , , O z' .a •O. C, 0, 76, y. 2. 3, 3: 0, N: �: .� t, 5, p p. 0. 0 V). ,«,• a s j 0, o: 3. .c' �: w U a° O v ° o ='; �: • , m O' ° .o �. avi: ° m: E' o c' 2' a ' o c' ai $' d 0' v. E ami' @. E 2 rn o a• a �. N. CD, c2) ~ m' a m: 9 d a d - a N v') 0a. C �, N �, a ° ai G3, CD -0.-p', f5' E: C cd):' '3 N' :�: CA c' o c O -O Q' 0. m, E: 0 O: °, 0, 3' ''C p, 2, N. co ,, •G a. E a 5 aS a), coO 0 ca' O N, 2 >r - -c, 2 u) -0 .N O c.a a) O a '65 c a a ami. co x vi a) e m 3 c, -d, o) c: C Q a a) c. ., ca a 3: a « - e o o ' m a) >, v a) LL J. ca JD _ "O v •d U c 0 �. ..: -, •O• •.L..' mvY Ty m m: >. .0 0 L. �. a v) U. . C CO c E' O. ay E' a) a) N .0 0' O L. c. c • a) U. ..: ,: D V. N 3. ti O. (n c O. coU. c c. m. C. X �. 0. 8: E 0 3 0 j o c, 0' 0' __ m' m �, N' a, 'p, N' ar _ U a), a, m U c w c, 3' 8' 8 c� �; co o; o o v m o c v m. o, o. 0) c"a v, m. r. v% a E a c, U 0 o �, a m o o' _o' —° 'b '> �° �° '1 a o y a coi o' m > > 3 g Cr > _C w. w. Y 3' �, CO. ' a E, -0, =a. a„i • m €: ami, .E m m' m, a; v a a 0, a`) co, m 3: ay 0, o, =, 2, 2'. 2. m. •a 0 v, v, O, O .°c; a ° a a`) ccoo, m. a) o,o, 0 a, -, D. 3, �, co o. O: a, a, 0, �, Q; a; z, oco, 0000Qw Q, w o`, mm: 05, 2, 2, a' 0rn, CO3 LX cuk a 0 — N Co (O CO r- co O) O N Co V M CO n co O) O N Co c c0 CO I. CO 0) ' E ��g p � N Co � (p t0 1� co O) � � N N N N N N N N N N M M M M M Co M M M M V I N �d .O-, O .m. O 0) O c W. O C a3 N O N O N U O s N O 0 O O O N D O OO N 111 O CD CN C a a CN 0 E Q. N N o • co 0 o J ° J O v Q a co w Q j Q CO U) a Q i