Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
215-112
7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in thes pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU J-10B Tubing Swap Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 215-112 50-029-20444-02-00 341J ADL 0028281 11462 Conductor Surface Intermediate Liner Liner 8902 80 2652 8787 668 3189 8254 20" 13-3/8" 9-5/8" 7" 3-1/2" x 3-1/4" x 2-7/8" 7769 30 - 110 30 - 2682 27 - 8814 8286 - 8954 8273 - 11462 2520 30 - 110 30 - 2682 27 - 8315 8285 - 8927 8272 - 9054 None 2670 4760 7020 10530 8254 5380 6870 8160 10160 9904 - 11290 7" 26# x 4-1/2" 12.6# L80 25 - 83169051 - 9047 Structural 4-1/2" Guiberson Polar Packer No SSSV Installed 8212, 7728 Date: Torin Roschinger Operations Manager Brenden Swensen brenden.swensen@hilcorp.com 907-748-8581 PRUDHOE BAY 6/15/2025 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2025.05.19 11:17:23 - 08'00' Torin Roschinger (4662) 325-312 By Grace Christianson at 1:19 pm, May 19, 2025 DSR-6/3/25A.Dewhurst 10JUN25 AOGCC witnessed BOP test to 3500 psi and annular to 2500 psi. 10-404 JJL 6/10/25 X JLC 6/11/2025 Gregory C. Wilson Digitally signed by Gregory C. Wilson Date: 2025.06.11 10:41:48 -08'00'06/11/25 RBDMS JSB 061225 Page 1 of 11 Tubing Swap RWO Well: J-10B PTD: 215-112 Well Name: J-10B API Number: 50-029-2044-02 Current Status: Non-Operable Producer PTD # 215-112 Estimated Start Date: 6/15/2025 Rig: Innovation Reg.Approval Req’std? 10-403, 10-404 Estimated Duration: 8 days Regulatory Contact: Abbie Barker 907-564-4915 (O) First Call Engineer: Brenden Swensen 907-748-8581 (M) Second Call Engineer: Finn Oestgaard 907-350-8420 (M) Current Bottom Hole Pressure: 3,200 psi @ 8,800’ TVD (7.0 ppge, based on offsets) Maximum Expected BHP: 3,400 psi @ 8,800’ TVD (est.) 7.5ppg EMW Max. Anticipated Surface Pressure: 2,520 psi Gas Column Gradient (0.1 psi/ft) Last SI WHP: 0 psi (3/31/2025) H2S Level (Most Recent / Highest): 14ppm 01/27/2023, 20ppm 02/04/2021 History J-10B is an Ivishak producer completed in 2015 via CTD. It has been an online competitive well ~90% of the time for the last decade. The well is not operable as of May 2024 due to tubing x IA communication. An LDL on 5/4/24 indicated a tubing leak @ 4,939’ MD with a LLR of 0.3 bpm @ 2,500 psi. A caliper of the 7” tubing showed up to 80% pitting @ ~7,000’ MD on 6/19/24. A CMIT to 2678 psi passed on 6/4/24 verifying that the packer and production casing have integrity. A tubing replacement is ideal for returning this well to production. The collapsed 7” tubing will be left in place and reamed out to allow 4.5” tubing to pass through. Objective Pull the existing 7” tubing and run new 4.5” completion to return well to production. Well Condition Date Pressure Pass? Event Type 4/23/2025 3169psi Y CMIT-IA 4/10/2025 5000psi Y PPPOT-T 4/10/2025 3500psi Y PPPOT-IC Page 2 of 11 Tubing Swap RWO Well: J-10B PTD: 215-112 Procedure (Page 1 of 3) Pre Rig Steps Slickline 1. Drift to plug for junk catcher. 2. If drift goes smooth, set junk catcher on top of plug at 8,254’ MD. a. SL drifted with a 20’ x 3.70” dummy whipstock to PX plug on 4/15/2025. b. 2024 caliper shows min ID of collapsed tubing is 3.86” (see WBS). Eline, Fullbore Assist 3. Punch 10’ of tubing just above tubing damage from ±7,765 – 7,775’ MD. a. CBL on 4/15/2025 shows top of cement at 7,884’ MD. 4. Confirm circulation between tubing and IA. a. If circulation is not established, contact OE and prepare to perform additional tbg punch. 5. Circulate ±500bbls or ±2.5 IA volumes of 1% KCL down the tubing and up the IA to fluid pack well with 8.5ppg KWF. a. Tubing volume to 7800’ MD 299 bbls, IA volume 200 bbls. b. Large circ volume intended to loosen any debris settling in IA to increase odds of tubing retrieval. c. U-Tube in freeze protect to 2,100’ MD after circulation is complete. 6. Perform tubing cut of the 7” tubing in the first joint above collapse at ±7,780’ MD. DHD 7. Bleed WHP to 0psi. Confirm well is dead. Valve Shop 8. Set and test two way check (TWC). Page 3 of 11 Tubing Swap RWO Well: J-10B PTD: 215-112 Procedure (Page 2 of 3) Proposed Rig Work Over Procedure (Page 1 of 2) 9. MIRU Innovation Rig. 10. Nipple down tree and tubing head adaptor. a. The current tubing hanger and THA are obsolete and will need to be replaced. b. A new THA and tubing hanger will be used so that the tree can be reused. 11. Nipple up BOPE. a. configuration top down: i. Annular BOP ii. 3.5” x 6” VBRs iii. Blind rams iv. Integral flow cross v. 7” fixed rams 12. Test BOPE to 250psi Low/3,500psi High, annular to 250psi Low/2,500psi High (hold each ram/valve and test for 5-min). a. Record accumulator pre-charge pressures and chart tests. b. Notify AOGCC 24 hrs in advance of BOP test. c. Confirm test pressures per the Sundry Conditions of approval. d. Test the 7” fixed rams with a 7” test joint. e. Test the 3.5” x 6” VBRs with 4” work string test joint. f. Test the annular with 4” work string test joint. g. Submit a completed 10-424 form to the AOGCC within 5 days of BOPE test. 13. RU hydraulic lubricator and pull TWC. 14. Rock out diesel freeze protect with 8.5ppg KCL or seawater. 15. MU landing joint or spear, BOLDS and pull hanger to the floor. a. Expected PU weight in 8.5ppg = ±180k #. 16. RU control line spooler for SSSV control line. a. Original tubing tally does not document number of clamps/bands. Expect 1 per joint. a. 51 joints. Record band count in preparation for fishing any missing bands if necessary. 17. Pull and laydown 7” tubing. Tubing will not be salvaged. 18. Make up string reamer BHA to open up collapsed tubing. a. Collapsed pipe at ±7,800’ MD. b. Target min ID = 5.5” to allow 4.5” tubing to reliably re-enter 7” tubing. c. See Halliburton Caliper dated 6/19/2024 for geometry of collapse. 19. Make clean out run with work string to top of plug at 8254’ MD prior to running new completion. Page 4 of 11 Tubing Swap RWO Well: J-10B PTD: 215-112 Procedure (Page 3 of 3) Proposed Rig Work Over Procedure (Page 2 of 2) 20. Run 4-1/2” gas lifted tubing string with packer completion. a. Torque turn connections. b. Target packer set depth ±7,700’ MD. 21. Land hanger and reverse in corrosion inhibited 8.5 ppg KCl or seawater. 22. Drop ball and rod and set packer. Target packer set depth ±7,700’ MD. 23. Perform MIT-T to 3,000 psi and MIT-IA to 2,600 psi for 30 charted minutes. 24. Shear the shear out valve in the top GLM. a. Freeze protect well to 2,100’ with diesel. 25. Set TWC. 26. ND BOPE. 27. NU tree and tubing head adapter. 28. Test both tree and tubing hanger void to 500psi low/5,000psi high. 29. Rig down Innovation Rig. Post rig valve shop work 30. Pull TWC. Post rig Slickline Work 31. Pull shear valve and run generic gas lift design. 32. Pull Ball and rod and RHC profile. 33. Pull junk catcher if it was set pre-rig. 34. Pull PX plug from 8,254’ MD. Attachments x Current Wellbore Schematic x Proposed Wellbore Schematic x Proposed BOP Stack x Original Tubing Tally x Caliper from 6/19/2024 x CBL from 4/15/2025 x Sundry Change Form Page 5 of 11 Tubing Swap RWO Well: J-10B PTD: 215-112 Page 6 of 11 Tubing Swap RWO Well: J-10B PTD: 215-112 TOC 7884' MD Page 7 of 11 Tubing Swap RWO Well: J-10B PTD: 215-112 Innovation Rig BOP Schematic Innovation Rig Choke Manifold Page 8 of 11 Tubing Swap RWO Well: J-10B PTD: 215-112 Original 7” Tubing Tally Page 9 of 11 Tubing Swap RWO Well: J-10B PTD: 215-112 Halliburton Caliper 6/19/2024 Page 10 of 11 Tubing Swap RWO Well: J-10B PTD: 215-112 Halliburton CBL 4/15/2025 TOC ~7884' MD Page 11 of 11 Tubing Swap RWO Well: J-10B PTD: 215-112 Changes to Approved Sundry Procedure Date: Subject: Sundry #: Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to the AOGCC by the “first call” engineer. AOGCC written approval of the change is required before implementing the change. Step Page Date Procedure Change HNS Prepared By (Initials) HNS Approved By (Initials) AOGCC Written Approval Received (Person and Date) Approval: Operations Manager Date Prepared: Operations Engineer Date Nolan Vlahovich Hilcorp Alaska, LLC Geotech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 5/08/2025 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20250508 Well API #PTD #Log Date Log Company Log Type AOGCC E-Set# BRU 241-26 50283201970000 224068 4/15/2025 AK E-LINE Perf BRU 244-27 50283201850000 222038 4/19/2025 AK E-LINE Perf IRU 11-06 50283201300000 208184 4/14/2025 AK E-LINE CIBP PBU S-22B 50029221190200 197051 4/15/2025 AK E-LINE IPROF SRU 231-33 50133101630100 223008 4/13/2025 AK E-LINE CIBP PBU 14-33B 50029210020200 223067 1/22/2025 BAKER MRPM END 1-65A 50029226270100 203312 4/15/2025 HALLIBURTON COILFLAG END 2-72 50029237810000 224016 4/11/2025 HALLIBURTON LDL END 2-72 50029237810000 224016 4/11/2025 HALLIBURTON MFC40 MPU R-105 50029238150000 225017 4/20/2025 HALLIBURTON CAST-CBL NS-19 50029231220000 202207 4/12/2025 HALLIBURTON RBT PBU 06-12B 50029204560200 211115 3/22/2025 HALLIBURTON RBT PBU 07-22A 50029209250200 212085 3/31/2025 HALLIBURTON RBT PBU B-30B 50029215420100 201105 4/9/2025 HALLIBURTON RBT-COILFLAG PBU H-17A 50029208620100 197152 4/10/2025 HALLIBURTON RBT-COILFLAG PBU H-29B 50029218130200 225005 5/1/2025 HALLIBURTON RBT PBU J-10B 50029204440200 215112 4/15/2025 HALLIBURTON RBT PBU M-207 50029238070000 224141 4/21/2025 HALLIBURTON IPROF PBU Z-25 50029219020000 188159 4/23/2025 HALLIBURTON IPROF PBU Z-31 50029218710000 188112 4/25/2025 HALLIBURTON IPROF Please include current contact information if different from above. T40372 T40373 T40374 T40375 T40376 T40377 T40378 T40379 T40379 T40380 T40381 T40382 T40383 T40384 T40385 T40386 T40387 T40388 T40389 T40390 PBU J-10B 50029204440200 215112 4/15/2025 HALLIBURTON RBT Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2025.05.08 12:42:44 -08'00' 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU J-10B Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 215-112 50-029-20444-02-00 11462 Conductor Surface Intermediate Production Liner 8902 80 2652 8787 668 3189 11423 20" 13-3/8" 9-5/8" 7" 3-1/2" x 3-1/4" x 2-7/8" 8929 30 - 110 30 - 2682 27 - 8814 8286 - 8954 8273 - 11462 30 - 110 30 - 2682 27 - 8315 8285 - 8927 8272 - 9054 None 2670 4760 7020 10530 None 5380 6870 8160 10160 9904 - 11290 7" 26# x 4-1/2" 12.6# L80 25 - 8316 9051 - 9047 Structural 4-1/2" Guiberson Packer 8212, 7727 8212 7727 Stan Golis Sr. Area Operations Manager Josh Stephens Josh.Stephens@hilcorp.com 970.779.1200 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028281 25 - 8315 N/A N/A 160 338 16403 13900 60 62 150 150 863 892 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV Installed STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations the best of my knowled February 2, 2023 By Meredith Guhl at 9:25 am, Feb 02, 2023 DSR-2/2/23 RBDMS JSB 020723 Perforate Sundry Number There is a typo below, but the WBS is correct. -WCB 215-112 PBU J-10B N/A WCB 11-8-2023 PRUDHOE BAY, PRUDHOE OIL ACTIVITYDATE SUMMARY 10/4/2022 ***WELL S/I ON ARRIVAL***(perforating) DRIFT TO DEVIATION @ 9,697' SLM W/ 30' x 2.29" DUMMY GUNS - NO ISSUES ***WELL S/I ON DEPARTURE*** 1/22/2023 CTU#9 1.75" Coiled Tubig (0.156 wall) Job Scope: Log/Drift, Add Perfs MIRU CTU9. MU BOT MHA & HES Mem Tools. WHP = 2190 psi. RIH w/ HES Mem Tools & 2.5" OD DJN drift. Btm 10,200' CTM / 10301' Mech. Log Up 50 fpm Red Flag 9879.9' CTM / 10,019' Mech. Log Up 50 fpm to 8849.6' CTM / 8995' Mech. POOH. BD HES Mem Tools (+144' Corr). MU HES FH & 40' Guns. RIH ***Continune on WSR 1/23/23*** 1/23/2023 CTU#9 1.75" Coiled Tubig (0.156 wall) Job Scope: Log/Drift, Add Perfs RIH w/ HES 40' of 2" Millennium Guns. At RED Flag - 9983' CTM / 10,049' Mech. Corr Depth to 10,021.82'. PUH Top Shot Depth @ 10,017'. (perf 10,014'-10,054' per Reference Log). Load 1/2" Ball & Circ w/ Diesel. At 28.7 bbls ball on seat and fired @ 2800 psi. POOH. BD Spent guns. MU HES 40' 2" Millennium Guns. RIH. Correct at red flag / Drop ball / Launch ball with diesel / Guns fire at 29.5 bbls. (perf 9974'-10,014' per Reference Log). POOH. BD guns. Stack down change pack-offs. MU BOT ctc & MHA. MU HES Mem Tools. Pop on WH. Open try RIH and Inj controls NOT performing right. Mechanics & ET on loc to trouble shoot. Ice on Inj Brake. Test Good. RU LUB/QTS. ***Continue on WSR 1/24/23*** 1/24/2023 CTU#9 1.75" Coiled Tubig (0.156 wall) Job Scope: Log/Drift, Add Perfs MU HES Mem Tools (GR/CCL) 2.4" Carrier w/ 2.5" DJN. RIH. Btm 10,102.5' E/ 10,135' M / 10,102.55' HES. Log Up 50 fpm WHITE Flag @ 9900' E/ 9933' M / 9900.04' HES. Log Up 50 fpm to 8800.2 E / 8833' M / 8800.22' HES. POOH. HES Mem Tools (GR/CCL). MU HES TCP 40' guns. RIH to White flag. Correct to flag @ top shot = 9929.75' MD. RIH. PUH Top Shot Depth @ 9937' MD. (Perf 9934'-9974' per Reference Log). POOH. BD guns - Confirmed guns fired. MU HES TCP 30' guns. RIH to White flag. Correct to flag @ top shot = 9929.75' MD. PUH Top Shot Depth @ 9907' MD. (perf 9904'-9374' per Reference Log). POOH. BD guns - Confirmed guns fired. BD scaffolding. RDMO. ***Continue on WSR 1/25/23*** 1/25/2023 CTU#9 1.75" Coiled Tubig (0.156 wall) Job Scope: Log/Drift, Add Perfs Continue to BD scaffolding. ND BOPs. Perform BOP Test. RDMO ***Job Complete*** Daily Report of Well Operations PBU J-10B MU HES 40' 2" Millennium Guns. RIH. g Correct at red flag / Drop ball / Launch ball with diesel / Guns fire at 29.5 bbls. (perfg 9974'-10,014' per Reference Log). POOH MU HES TCP 30' g g guns. RIH to White flag. Correct to flag @ top shot = 9929.75' MD. PUH Top Shotggg@ Depth @ 9907' MD. (perf 9904'-9374' per Reference Log). POOH RDMO. MU HES TCP 40' guns. RIH to White flag. Correct to flag @() g g g@ top shot = 9929.75' MD. RIH. PUH Top Shot Depth @ 9937' MD. (Perf 9934'-9974' ( per Reference Log). POOH.g) (g) DRIFT TO DEVIATION @ 9,697' SLM W / 30' x 2.29" DUMMY GUNS - NO ISSUES g( ) MIRU CTU9. MU BOT MHA & HES Mem Tools Btm 10,200'CTM / 10301' Mech. Log Up 50 fpm Redg Flag 9879.9' CTM / 10,019'Mech. Log Up 50 fpm to 8849.6' CTM / 8995' Mech. g POOH This is a typo, apparently. They RIH w/30' guns, with the top shot depth @9907'MD, aiming to re-perf the upper 30' of the 9904' - 10054' interval. The typo should say "9934," not "9374". The new WBS, below, shows the correct depths for the new adperfs. -WCB g( ) g RIH w/ HES 40' of 2" Millennium Guns. At RED Flag - 9983' CTM / 10,049' Mech. g Corr Depth to 10,021.82'. PUH Top Shot Depth @ 10,017'. (perf 10,014'-10,054' per @( Reference Log). Load 1/2" Ball & Circ w/ Diesel. At 28.7 bbls ball on seat and fired g) @ 2800 psi. POOH@ • • `_._._.. . + In • o • O 0 N I N M0 ,- 0 a 0 N ZI CQi ZI c) p=p m Q w w a• O I I I 0 n -0. a Z c ((11 '� 0 a 0 a 6- OJ W 1 0> o) o E o) 0 N g 0 D 0 D o o CO H c c a > o 5 >- I'I ca o 0 0 o 00' 0 o _ = NI Z co u) u) to O o IA T o iil < '< < <CO CO M M I- �� N t` 0)) -a o a� aia 'a a- a a Z o0 0 LU CO Z3 Eco 1 co�I �1 �I �1 �1 = m U1 M o F a) 1 LLa01 l �I �I �I a1 aI < it LJLI O N mi o m t O 0 0 0 0 Ow uj JI @ ct CL I2 In In In � i) O u)0 u) u)o U m U U 0 0 c « Z m Z -)Z - 'Z Z 'Z 0 I)Q Y D D D O D o c,@ a1_ aco 1 rn ui a1_ ai a1 w ai a1 ui a1 m LL H ai ui 6-0 Z o w 02i 02 m it it it it aIn o-1- itii it ii ,ri CO a c.)a_ I tea = c.)CL tea = oa ga a v0>= o rn E 'c� � cam 'cern cam 'ca 'Ea N W Cm c C c N m rn O 22 5 22 1 221, 2 1 2 2 Np o � 1 2 2 oQ J V',v mlN mlcn v mlN v ml(n i�ml i�ml 0 Q ml'n t v Wo N <▪ 'ElX00 (DOE, .00 -o0 00 f0 °� 0LL 'w wOo °) o I Li Q 2 '0 ,- 0 MHN W D W N M‘- (1) M ,-0 NM W N W W M .1- 0 N O V Co in Lo Lo up io to LO LO LO Om - Y !' O O O O O O O O O Wo ,- N r r r NJ NJ r N N N N IX 0 CD V CO CO CO W J CO W r a- a m lisli a) a) W a a, W X W J = _ V m O ', 00 Z 8 a m \ o c,-, v 0 v 7 To N J Q t 0 of N 0. COc Z �1 c v 0 M_ C O O c .�. W(fp N O O ON y N W co co ~ J V E a M 0 r U co c o J N rc Z c4 v I- o CV co a 1— H n rn 000 2 = 0 \J J 2 N or CO m• CoW \/� J ) V/ Q @ m I Z1a o o �, a N E J U CO Z a7 C N ,. 0 @ co co co co co v co CO (0 CO I' 0 E E O 0 0 0 0 0 CO 0 0 0 0 i a a, Z m m m m m _m 2 m m m m 0 z p �, 0 0 0 0 0 0 _1 0 0 0 0 N > 0 JL y 0 N.. r- F- r--- r- F- r- - a a v ✓ w M CO CO CO W CO W CO CO CO CO CO 11) QZ t C •Or 16 Eco ',(0 (O (O CO (O W CO CO(0N N N CD C.0 N 0 Q Q W O Z N . N N N N N N N N N N 0 Q `o O _ 0 r _� 1' O Z W c � 2 U 0 0 0 0 0 0 0 0 0 0 v h n Q y J O N 0 U01E CD0p 0 0 0 0 0 p 0 0 0 0 ¢ 0. I ' w-Iol- w LU LU w w _I w w w w S • 0 N ❑I W_ ❑I W• ' ❑ co I N J LT_I W `_ Y J d c W I W I '0 V H Y w J a 0 C ` c _ J _ J a , • U H tL < 0 b coTi• z 2 m 2 LLI Z WI Z o o > w I 0I JI z 0 E o) _0 a a a Q W Q LL I aa) aai 6 U) co m Z 0I o N• ❑ Not �I �I tZ-i Z ce 0 ani aTi cl LLI (0 ,- Z o r co co I ❑ I ❑ N CD 2 Z 0 Co O. 0 ❑ H >; U7 co 7 7 0 > 0 > Z Z o o u)) vim) co > H 'o Zco N N LoI �I ,ol Li-0 N Cl)I �I Co a •7 u)I (01 ❑ �I �I �I 0 0 0 o c c c Co iI «al 3 0 0 > F Q M .05I .073I 0 0 0N 0 W W WI WI NI UI of U` 0 00 �I �I � O CO 0 0 CO CO O Q Q W L7I0 (n Q Q c Q < O CV O ai a ui a ui a ai rnl ai w1 Y gi v,1 ai w1 Y ai ai ai ai ui ai ai ui co ui 0 Y ❑ - IL �i it Cn LL in it Et VI U ce H IL a I1 H it it it it it it it it L LL I-2 d in Y 0 0-6 0 0 I o I U 0 I 0 I U 0 0 0 0 0 0 0 0 I U IU 'c "c "c O_ H c ECC- "c ECCF.. "c 0_ c-1 "c "c "c "c "c "c 'c O_ H "c CC - N W I N m �� 2Q 2Q 2Q 200 202 200 202 0 0 0 0 0 0 0 000 202 ,_ ❑ ' r J N O _Ln N N O _N m1=1 N COIm1 N m1=1 a 031 031 N N 0 0 0 0 0 0 o' Tc.) 001 03❑I ,_W ceQ ,,,°'IL- 0 W71 W (01 W (n1 W -CO W�❑J W —in W - J W W W LU W W W W e- CO W N-_J N2 Oa 0 0LU LU LU in in LU U) LULULULULUU) LULU W O O o o O 0 0 0 0 0 0 O 0 O 0 0 W N N N N N N N NNNNNNNN N 0 CO CO W W CO O O W W CO W CO CO CO W CO A/ J co co O) 0) O) O) O) 0) a) m 01 0) co O) co a W W J a- 0 m o Z ao N o J 0 0 co Cl. in2 r 0 0 O ') O N a V ~ 0 0 o J r N N a ez ct c. r -1) ZO = N 2 W m 00 �'M^ O a) V/ p as 0 a CL • a) ao 0 z ° co E U c U R ( Z N 03 CO CO CO CO Co CO Co Co Co Co Co CO CO CO N co (0 co (0 Co CO co (0 co Co co as Co (0 CO CO (0 "O • No 0 0 0 0 0 0 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 N 1 co m CO (0 �o co m Co CO co CO CO CO m CO m Co 2 00 Dorn .a 'rn .a 'rn _rn rn _rn rn _rn orn •a) •rn _° _a 0 C7 ❑ ❑ ❑ 0 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ o N > 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 CO CO CO (0 CO CO CO CO Co CO CO CO CO CO (0 co (0 • H N N N N N N N N N N N N N N N N N In O O CO O CO (0 O CO CO CO CO CO CO CO O CO CO ✓ N N N N N N N N N N N N N N N N N N F. N 0 ° Tr .2U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U w 0 0 `) ❑ ❑ ' ❑ 0 0 0 0 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 0 0. W W W W W W LU W W LU LU W LU LU LU W J • 0 kn 0 0 0 N N o Z Tcg >- I1\7}—1 II' E O o L >, Z Q Tu to c p) 'd C co $1,:. ., 6 Z L L O li �, Fr E 0 a V. U U co 1 J I � ^ �� 0_ C 1 Co1z/ hi N fi�// < V ;3 co G Li1 0 it Z m a)Tx ti J2 m a. Ueri= ElacoE 0 cl /LU WN Z a; li OJ CoN a. Coil: E Ill w • N CD I J a) co O) p V 0. m o - J E 12 z 2 `� ICCasfn --I Q c li J a) _ D E .- O 'a 2 U U au" c T p N ON Q Co) E Q M r U c w J T m 0 } O E M a) eh Q O O III o 0. V 1 ~ ( - /� E O 2D• N 0 6 C • 10 CI in' CD W m ao c o E ICLLI ca 46 w 3 ili V♦ p 0 N cN c — C p la l ' a ° @ ° °' Z. o Q o g 0 1 Q z o12 8 > CI £ V 6 2 Co fa Z d LO LO a C Z I N N I'I I LO E 03 \J ao O p D cp I� •>. T 1- W E o. 0 d N Cl) 0 �O N d E E Z 8 W to CO 01 O caV O :: C iii vd O zF= Z c CO o Q o o Qoo Uw m J a) aa a) I , U Fe a)' 5 t E c oE — Q o u. E o QyE : E d o 00Ca 3 0 a U C.) 0 PBU J-10B /PTD # 215-112110 410- Page I of I PBU J-10B / PTD # 215-112 Lastufka, Joseph N [Josephiastufka@bp.com] Sent:Friday, October 09, 2015 9:27 AM To: AOGCC Reporting (DOA sponsored) Hello, RECEIVED Please reference the following well: OCT 9 2015 Well Name: PBU J-10B AOGCC Permit#: 215-112 l� API #: 50-029-20444-02-00 Date of Test: 9/28/2015 Type of Test: IPT (Initial Production Test) Choke Size: 128 Choke Unit: 64ths Production Method: Flowing Duration (Hours Tested): 8 Top Reference (Top Perf MD): 10180' Bottom Reference (Bottom Perf MD): 11290' Tubing Flowing (Pressure): 820 Casing Pressure: 900 Total Test (Rate f/O, W, G): 1177/5 /6119 24-Hour Rate (0, W, G): 3532 / 15 / 18358 Gravity (Oil, API): 25 GOR (Gas-Oil Ratio): 5197 This well began Production on Method of Operations on this date: 9/28/2015 https://webmaila.alaska.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAABKLne2zgP4SoM... 10/9/2015 STATE OF ALASKA SEP 1 0 2015 SKA OIL AND GAS CONSERVATION COMMISSI WELL PLETION OR RECOMPLETION REPOR D LOG A®G CC la. Well Status: Oil R• Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended 0 lb.Well Class: 20AAC 25.105 20AAC 25.110 Development p Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 No.of Completions: One • Service 0 Stratigraphic Test 0 2. Operator Name: 6. Date Comp. Susp.,or Aband.: MG 14.Permit to Drill Number/Sundry BP Exploration(Alaska),Inc 8/ •j 2015 • 215-112 3. Address: 7. Date Spudded: 15. API Number P.O.Box 196612 Anchorage,AK 99519-6612 •8/6/2015 50-029-20444-02-00- 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number: • 8/11/2015 PBU J-10B - Surface: 550'FNL,804'FEL,Sec.09,T11N,R13E,UM • 17. Field/Pool(s): 9. KB(ft above MSL): 69.2' • Top of Productive Interval: 583'FNL,1487'FWL,Sec.10,T11N,R13E,UM GL(ft above MSL): 40.07' • PRUDHOE BAY,PRUDHOE OIL • Total Depth: 187'FNL,304'FEL,Sec.09,T11N,R13E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: 11423'/8929' • ADL 028281 • 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/TVD): 19. Land Use Permit: Surface:x- 643543 • y- 5970804. Zone - ASP 4 •11462'/8902' . TPI: x- 645835 y- 5970815 Zone - ASP 4 12. SSSV Depth(MD/TVD): 20 Thickness of Permafrost MD/TVD: Total Depth:x- 644036- y- 5971176 • Zone - ASP 4 None 1900'(Approx.) 5. Directional Survey Yes 1I (attached) No 0 13. Water Deoth.if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) •8954'/8452' • 22 Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary MWD/GR/RES,GR/CCL/RPM 23. CASING,LINER AND CEMENTING RECORD CASING Wr.PER GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT FT. PULLED TOP BOTTOM TOP BOTTOM 20" • Insulate Conductor 30' 110' 30' 110' 36" 8 cu yds Concrete 13-3/8" 72# L-80 30' 2682' 30' 2682' 17-1/2" 3720 cu ft Arctic Set II 9-5/8" 47# L-80 27' 8814' 27' 8315' 12-1/4" 1192 cu ft Class'G',130 cu ft Arctic Set I 7" 29" L-80 8286' B954' 7800' 8452' 8-1/2" 429 cu ft Class'G' 3-1/2"x3-1/4" 9.3#/6.6# L-80 8273' 11462' 7787' 8902' 4-1/4" 204 sx Class'G' x 2-7/8" /6.4# 24. Open to production or injection? Yes RI No 0 25. TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): 7",26#x 4-112",12.6#,L-80 8316' 8212'/7728' 2"Gun Diameter,6 spf 10180'-10640' 9040'-9040'• 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 10780'-11160' 9040'-9037' i, 11270'-11290' 9017'-9009' • Was hydraulic fracturing used during completion? Yes 0 No I✓7 • $ .� ,� .41 "I,r Per 20 AAC 25.283(i)(2)attach electronic and printed ,[ .► -,.f•,,,j,.74.. information i/ct 17�+', 1./4•, ; DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED ,.., 2500' Freeze Protect w/93 Bbls Diesel 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation(Flowing,gas lift,etc.):N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period ...► Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press 24 Hour Rate �► • Form 10-407 Revised 5/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only !/'TG 9/i5 ei't 41115-- RBDMaAEP 1 1 2015 Al-' g,/G.,is'" 28. CORE DATA • Conventional Core(s) Yes ❑ No El ' Sidewall Cores Yes ❑ No EI If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost-Top Well Tested? Yes ❑ No 21 Permafrost-Base If yes,list intervals and formations tested,briefly summarizing test results.Attach separate sheets to this form,if needed,and submit detailed test information per 20 Shublik 8965' 8463' AAC 25.071. Sadlerochit-Zone 4 9048' 8545' CGL-Zone 3 9225' 8716' BASE OF CGL-ZONE 2 9290' 8776' Zone 1B 9655' 9024' Zone 2(Invert) 11268' 9018' Formation at total depth: • Zone 2(From Base) 11268' 9018' 31. List of Attachments: Summary of Daily Drilling Reports,Well Schematic Diagram,Survey,Cement Report Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis,paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Ciolkosz,Ryan R Email: Ryan.Ciolkosz@bp.com Printed Name: Joe Lastu n Title: Drilling Technologist Signature: �/Jyl� hone: +1 907 564 4091 Date: If 0 !/ I INSTRUCTIONS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item la. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item lb.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and TVD for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31.Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 5/2015 Submit ORIGINAL Only litLE= 6-3/8"CIW LI-LAO= FIVC • J -1 0 B MAX WELL ANGLE>70*@ 9672' MAX COW 28 @ 11285. ACTUATOR= onsBB OKB.ELEV= 69.2' I BF.11EV= 4008' KOP= 3200' — I 2035' —7"OT1S RPB SSSV NIP WI INSERT,1)=3.813" 20" , ? .. Max Angle= 135°@ 11403' [ tumM1)= 8563' it, , Datum TVD= 8800SS 0 r — cIL--I 2607' —19-5/8'DV COLLAR 13-3/8"CSG,724,L-80 BTRS,D=12347' — 2687 Minimum ID =2.377" @ 11424' 3-3/16" X 2-7/8" XO if, Ir `.." e , k 1 %; !Ik 8188' —19-518-X r GuIBERSON PBR 13=? I 7'TBG,26#,L-80,.0383 bpf,1)=6176' J Kiln. 7•11 1, • ti, t 8212' —7"X 4-1/2"GUSERSON POLAR ,.IIC FKR,ID=?(SQUEEZE)05/26/94) 4Ie4s %ow-4 8264' —14-112"OTE X NIP,ID=1813' IA...., CV 1 . ' ',,0 TOP OF 3-1/2'X 3-3/4"LNR/CMTD — 8273' ;,—":v K 1 8273' —I3.70' BKR DEPLOY SLV,13=3.00" * 40 004° : 0 04/40 '01•41; 8285' —4-1/2'ons XN!AP,IVILLED TO ID=3.80" i*a. i,,,4 1 TOP OF r LNR H 8286' ' --7;-41 0;--- 82 ' —19-5/8"X r BOT LM R HGR ID= " 1'A 0 -: E4 0,,. 1 :: , 8316' —4-1/2 GUI:3E1250N SFEAROUT SUB CTLII 4-1/7 TBG, 12.64,L-80,.0152 bpf,C=3.958' '— 8316' Is PP tom ;4,';44 (BEillkD CT LW) N k 5 . ' 8316-8335]—CMT SHEATH F/'94 FKR CMT JOB, 9-5(8"CSG,47*,L-80 BTRS,D=8.681' — 8814. 4 - ' & PALLED TO 3.80"(B133-IND CT LNR) 3-1/2'TBG,9.34,L-80 SIL,.0087 bpf,1)=2.992" — 893T 17'X4-1/2"BKR VVI-IPSTOCK(013/05/15) —I 6949. il i Al „a.. " , 8937' H3-1/7 X 3-3/16"X0,ID=2.766' yr,. r LNR,294,L-60 BTRS, 0371 bpf,ID=6.184" — —8949. PALL OUT WINJOVV(J-10B) 8954'-8962' PERFORATION SUPWARY • , ptii „do. .,..... 10026' —PUP.111 w/RA TAG' REF LOG:BKR PAW GR ON 08/11/15 64 _ ANGLE AT TOP FERE:91 .0 1018(7 tip J Note:Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE SHOT ri.. Ill 2” 6 10180- 10640 0 08/14/15 • ,nr• 2" 6 10780-11160 0 08/14/15 ir 2" 6 11270-11290 0 08/14/15 * • 'A 0 . - - • If: to 10,44 3-114"LNR,6.6#,L-80 TCA,.0079 bpi,0=2.850' —I 11424* 11424' 3-3/16"X 2-7/8'XO,ID=2.377"ei _-1 **,44 11423' Ii L_ OW..d0,04111. Li/8-Liqz 6.4#,L-80 STL,.0058 bpf,ID=2441" I— 11462' a`• DATE REV BY CO -MENTS DA1E REV BY COMMENTS FRUDHOE BAY UNT 04/13/81 P4-18E ORIGINAL COMPLETION %NELL: J-10B 09/16/02 NORDIC 1 CTD SIDETRACK(J-10A) PERIAT No: 2151120 08/15/15 NORDIC 2 CTD SIDETRACK(J-106) AR No: 50-029-20444-02 08/26/15 .M) DRUG I-10 CORRECTIONS SEC 9,T11N,R13E,550'FfsL 8 804'FEL 08/27/15 RCJJM) MNDR WBS EDITS 08/27/15 RC/JI4D FINAL ODE AMROVAL BP Exploration(Alaska) • 0 North America-ALASKA-BP Page 1 of 14 Operation Summary Report Common Well Name:J-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/2/2015 End Date:8/11/2015 X3-0176G-C:(4,143,618.52) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/17/1980 12:00:00AM Rig Release:8/15/2015 Rig Contractor:NORDIC CALISTA 1 UWI:500292044400 Active datum:Kelly Bushing/Rotary Table @69.20usft(above Mean Sea Level) Date I From-To I Hrs I Task I Code 1 NPT NPT Depth Phase Description of Operations (hr) I (usft) 8/2/2015 06:00 - 07:30 1.50 1 MOB P PRE RIG OFF OF MAINTENANCE AFE AS OF 06:00 HRS. -CONTINUE WITH CLEANING AROUND LOCATION AND STAGING MATTING BOARDS WHILE DRILLER AND TOOLPUSHER CONDUCT ROUTE DRIVE ,-_,CONDUCT PJSM ON RIG MOVE 07:30 - 10:30 3.00 MOB P PRE BEGIN RIG MOVE FROM PRICE PAD TO J-PAD. RIG ON LOCATION AT 09:00 HRS. STAGE MATS,PREP AROUND WELL. 10:30 11:30 1 1.00 MOB P PRE 'MOVE RIG OVER J-10B -PJSM FOR MOVING OVER WELL. ' -MOVE RIG OVER WELL. __ -RIG ACCEPT 11:30 HRS. 11:30 - 12:15 0.75 BOPSUR P PRE PJSM FOR CONDUCTING LEAK TIGHT TEST i .ONTREE CAP FOR NIPPLING UP BOP. ;CONDUCTTEST,PASS. 12:15 - 18:00 5.75 BOPSUR • P + PRE STAGE SUPPORT EQUIPMENT,PREP AREA i FOR OPERATIONS. INSTALL REEL INTO REELHOUSE,INSTALL INNER REEL IRON - }-NU BOP STACK -INSTALL STUFFING BOX AND RU INJECTOR TO LUBRICATOR -INSTALL GOOSENECK 18:00 - 22:30 4.50 BOPSUR P • PRE RIG UP INJECTOR AND COIL -LIFT INJECTOR OVER WELL. j-PULL COIL ACROSS AND STAB INTO i INJECTOR. CALIBRATE LOAD CELL. -FLOOD STACK,PREP FOR BOP TEST. 22:30 - 00:00 1.50 BOPSUR ' P I PRE BEGIN PRESSURE TEST BOPE -PJSM WITH RIG CREW FOR TESTING BOPS. -GOOD SHELL TEST. -AOGCC WITNESSED BY INSPECTOR CHUCK SCHEVE. 8/3/2015 00:00 06:00 6.00 BOPSUR P I PRE PRESSURE TEST BOPE. -TEST ANNULAR,BLIND/SHEAR RAMS, UPPER AND LOWER 2-3/8"PIPE/SLIP RAMS, 12-3/8"X 3-1/2"VBR'S,KILL LINE AND CHOKE VALVES. I I I-WHILE TESTING BOPE FILL REEL WITH KCL WATER. CONDUCT DRAWDOWN TEST. I l TEST WITNESSED BYAOGCC INSPECTOR CHUCK SCHEVE. 06:00 - 08:30 2.50 BOPSUR P j PRE COMPLETE TESTING OF BOP EQUIPMENT. I STAB ON WITH INJECTOR AND TEST i I PACKOFFS AND INNER REEL IRON. Printed 8/24/2015 10:16:46AM II) North America-ALASKA BP . Page 2 of 14 Operation Summary Report Common Well Name:J-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/2/2015 End Date:8/11/2015 X3-0176G-C:(4,143,618.52) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/17/1980 12:00:00AM I Rig Release:8/15/2015 Rig Contractor NORDIC CALISTA UWI:500292044400 Active datum:Kelly Bushing/Rotary Table @69.20usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT )Depth Phase Description of Operations (hr) .... _ 08:30 - 10:15 1.75 BOPSUR P PRE DRILL SITE MAINTENANCE CHECKED TORQUE ON TREE, ALL GOOD. INCURRING BLEED OFF ON ATTEMPT TO TEST. TROUBLESHOOT BAKER MANIFOLD,CLOSE IN AGAINST KILL LINE. STILL BLEEDING. INDEPENDENTLY TEST VALVES,GOOD. -LINE UP TO CLOSED INNER REEL VALVE AND CLOSED KILL SIDE,PRESSURE UP AND PRESSURE HOLDING SOLID YET STILL OBSERVING FLUID AT SHAKER FROM RETURN LINE. ISSUE IS ISOLATED AT ONE OR BOTH OF THE PUMPS. 10:15 - 13:15 3.00 BOPSUR P PRE CONDUCT LOW AND HIGH PRESSURE TEST OF PACKOFF AND INNER REEL IRON. LOW TEST PASSED. HIGH TEST BLED BY SWAB VALVE. ENSURE PROPER VALVE LINE-UP, GREASE AND CYCLE VALVE. ATTEMPT HIGH PRESSURE TEST AND IT BLED BY AGAIN. -BLEED DOWN PRESSURE. REMOVE INJECTOR AND SET ASIDE. DRAIN STACK, INSTALL TEST PLUG INTO SPOOL. FILL STACK, 13:15 - 14:00 0.75 BOPSUR P PRE CONDUCT RIG EVACUATION DRILL. "SIMULATED H2S HIGH GAS ALARM IN PITS AT SHAKER. COMMUNICATE GAS IN PITS, (SOUND ALARM. DRILLER COMMANDS TO SHUT IN WELL,CTS OPERATOR USES REMOTE PANEL TO SHUT IN WELL. PERSONNEL EVACUATE RIG IN ACCORDANCE TO EVAC PROCEDURE. MUSTER CREWAND TRUCKING PERSONNEL I IN PRIMARY MUSTER AREA. CONDUCT AAR. DISCUSSED WHEN NOT TO CROSS RIG DUE TO WIND AND FLAMMABILITY OF H2S AND HOW IT PERTAINS TO TRUCKING NEXT TO RIG. CREW REACTED VERY WELL OVERALL. 14:00 - 14:30 0.50 BOPSUR P PRE CREW CHANGE OUT. CONDUCT H2S EVAC DRILL WITH INCOMING DRILLING CREW WITH SAME CONDITIONS. CONDUCT AAR WITH CREWAND DISCUSS WHAT WAS DISCUSSED WITH EARLIER CREWAND ANY IDEAS FROM THEIR CURRENT DRILL. NOTHING MORE DEVELOPED FROM SECOND DRILL. GOOD CREW RESPONSE. 14 30 - 16 00 1.50 BOPSUR P PRE !PULL TEST PLUG FROM STACKAND LAY DOWN TEST JOINT. INSTALL RISER CAP AND CONDUCT LEAK TIGHT PRESSURE TEST TO 250/3500 PSI AGAINST CLOSED TREE VALVES. GOOD TEST. OPEN TREE VALVES, NO PRESSURE FROM WELL. MONITOR WELL THROUGH SENSOR ON WING VALVE WHILE CONTINUING WITH OPERATIONS. -SIMOPS:LOAD FLUID INTO PITS,MOBILIZE GS SPEAR BHA TO RIG FLOOR 16:00 - 16:45 0.75 CASING P DECOMP CLEAR AND CLEAN RIG FLOOR. PJSM ON MAKING UP BHA. INSPECT LIFT EQUIPMENT. 'OPEN UP TO WELL TO TESTED RISER CAP AND CLOSED CHOKE,NO PRESSURE. OPEN CHOKE,NO FLOW. 16:45 - 18:00 1.25 CASING P DECOMP MU SEALABLE GS SPEAR BHA WITH JARS AND DUAL BACK PRESSURE VALVE -STAB INJECTOR ON WELL,TEST QTS. Printed 8/24/2015 10:16:46AM • 0 North America-ALASKA-BP "' ,APIr Page 3 of 14 r y Operation Summary Report Common Well Name:J-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/2/2015 End Date:8/11/2015 X3-0176G-C:(4,143,618.52) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:NORDIC 2 I Spud Date/Time:7/17/1980 12:00:00AM 1Rig Release:8/15/2015 Rig Contractor:NORDIC CALISTA I UWI:500292044400 Active datum:Kelly Bushing/Rotary Table(069.20usft(above Mean Sea Level) Date I From-To I Hrs I Task I Code NPT NPT Depth Phase Description of Operations (hr)— (usft) 18:00 - 21:00 I 3.00 CASING P DECOMP I RIH WITH LINER FISHING BHA FROM I SURFACE TO 8270'MD. '-RIHAT75-80 FPM -0.5 BPM,8.4 PPG KCL -PUW 44K AT 8,000'MD j 1 -ENGAGE LINER FISH WITH GS SPEAR AT 8,270'MD - CONFIRM LINER LATCH UP WITH PUW 54K 21:00 - 00:00 3.00 CASING P I DECOMP CIRCULATE 2X BOTTOMS UP I -1.5 BPM,8.4 PPG IN AND OUT 0 03:30 3.50 CASING P - PPG KCLAT 11 DEG F TAKE RETURNS OUT TO FLOW BACK TANK 8/4/2015 00:00 I DECOMP CIRCULATE 2X BOTTOMS UP 1-3.0 BPM,8.4 PPG IN AND OUT -8.4 PPG KCL AT 110 DEG F j i -TAKE RETURNS OUT TO FLOW BACK TANK -FIRST BU TO SURFACE HAD EXPECTED SLIGHT AMOUNT OF GAS FROM BEHIND 13-1/2"LINER.SHUT DOWN AND MONITORED, I I ,WELL STATIC. I-SECOND BU PROVIDED NO MORE GAS. -TAKE RETURNS INTO MUD GAS SEPARATOR AFTER RETURNS CLEAN UP. FLOW CHECK FOR 10 MIN-WELL STATIC 03:30 - 06:00 2.50 CASING P DECOMP I POOH WITH 3-1/2"LINER FROM 8,270 PSI -HOLD 200 PSI BACKPRESSURE ON WELL TO AVOID SWABBING. -40 FPM PULLING THROUGH 4-1/2" PRODUCTION TUBING. j -60 FPM PULLING THROUGH 7"PRODUCTION TUBING. 'CONDUCT H2S RIG EVACUATION DRILL WITH CREW. 106:00 - 08:30 2.50 CASING P I DECOMP PULL TO SURFACE WITH 3-1/2"TUBING I STRING ON GS SPEAR ASSEMBLY. FLOW I CHECK AT SURFACE,WELL STATIC. i -8.4 PPG KCL IN AND OUT -TAG UP WITH BHA 08:30 - 09:00 0.50 CASING ! P , DECOMP POP OFF,BREAK OFF FROM COIL. LAY DOWN GS SPEAR ASSEMBLY. BEGIN LAYING 'DOWN 3-1/2"TUBING. BREAKING OUT FAIRLY EASY. 09:00 - 09:15 0.25 CASING ' P 1 f DECOMP CONDUCT KICK WHILE HANDLING BHA DRILL WITH 3-1/2"TUBING ACROSS STACK. CREW RESPONDS WELL,FOLLOWED STANDING ORDERS AND HAD WELL SECURE IN 90 SECONDS. CONDUCT AAR,DISCUSS THE :GOOD COMMUNICATION OF TORQUE VALUES IAND BEING PREPARED. 09:15 - 10:15 1.00 CASING P I DECOMP COMPLETE LAYING DOWN TUBING. TOTAL OF 24 FULL 3-1/2"JOINTS,ONE 4'PUP JT, AND ONE CUT JOINT 20.63'LONG. 10.15 - 12:00 1.75 CASING P I DECOMP MOBILIZE TUBING OFF OF RIG FOR NORM I ANALYSIS. CLEAR AND CLEAN RIG FLOOR. PREP FOR PUMPING SLACK. CONDUCT i PJSM ON PUMPING OPERATION,DISCUSS PRESSURES AND WEAK POINTS OF OPERATION. -BEGIN PUMPING OPERATION,MOTORMAN STOPS OPERATION Printed 8/24/2015 10.16:46AM INorth America-ALASKA BP • Page 4 of 14 ,. 70,","„ , *,:. , its-*OW Operation Summary Report Common Well Name:J-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/2/2015 End Date:8/11/2015 X3-0176G-C:(4,143,618.52) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/17/1980 12:00:00AM Rig Release:8/15/2015 Rig Contractor:NORDIC CALISTA I(JIM:500292044400 Active datum:Kelly Bushing/Rotary Table i 69.20usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 12:15 0.25 CASING N SFAL DECOMP CREW RESPONDS TO SMOKE IN PUMP ROOM#1. BRING ON PUMPS,ISOLATED TO BELT HOUSING OR TRACTION MOTOR. SWAP TO PUMP 2. 12:15 - 12:45 0.50 CASING P DECOMP CONTINUE WITH SLACK MANAGEMENT. PUMP E-LINE BACK AT 3.65 BPM,3000 PSI. 12:45 - 13:30 0.75 CASING P DECOMP RIG UP COIL CUTTER.CUT 275'OF COIL FOR 1.75%OF SLACK. RIG DOWN COIL CUTTER. -DETERMINE THAT TRACTION MOTOR ON PUMP 1 HAS SHORTED OUT-REPLACING TRACTION MOTOR OFF OF CRITICAL PATH 13:30 - 17:15 3.75 CASING P I. DECOMP INSTALL COIL CONNECTOR. PULL TO 35K. PRESSURE TEST 250 LOW/4000 HIGH, I GOOD TESTS. STAB ON,PUMP SLACK FORWARD. TEST I E-LINE. MAKE UP BHI UPPER QUICK CONNECTOR,RE-TEST LINE. -PRESSURE TEST BHI CONNECTIONS TO 250 LOW/3500 HIGH,GOOD TESTS. TEST CHECKS WITH TEST PUMP TO 250 LOW/3500 HIGH, 17:15 - 18:00 0.75 CASING P DECOMP I PJSM FOR MAKING UP CALIPER-DRIFT BHA. MU 24-ARM CALIPER TO 3.625”DRIFT BARS -AND BHI SMART TOOLS. 18:00 - 21:50 3.83 CASING P DECOMP STAB ON. PRESSURE TEST QUICK TEST SUB AS BHA IS RUN IN HOLE. RIH WITH CALIPER AND DRIFT BHA. MW IN 8.44 PPG,MW OUT 8.42 PPG. 21:50 - 22:20 0.50 CASING P DECOMP PERFORM TIE IN+2 TAG TUBING STUB WITH WEIGHT BARS PUTTING CALIPER 17'IN. WAIT FOR ARMS TO OPEN I START LOGGING OUT OF HOLE 22:20 - 00:00 ' 1.67 CASING P DECOMP POOH WITH CALIPER _ PJSM/10 MINUTE FLOW CHECK AT 200' 8/5/2015 00:00 - 01:00 1.00 CASING P DECOMP TAG UP, LAY DOWN PDS CALIPER. DOWNLOAD DATA. VERIFY WE HAVE DATA. PDS HEADING TO DEADHORSE TO UPLOAD AND SEND DATA TO HOUSTON FOR PROCESSING. 01:00 - 03:00 2.00 CASING P DECOMP PREPARE TO PICK UP BAKER WHIPSTOCK BHA SLB REPLACING COUNTER BALANCE VALVE !ON INJECTOR GET DRAWINGS FROM BAKER OIL TOOLS 03:00 - 06:00 3.00 WHIP P WEXIT MAKE UP AND WHIPSTOCK BHA RUN IN HOLE WITH WHIPSTOCK 06:00 - 08:00 2.00 WHIP P WEXIT RESULTS BACK FROM CALIPER RUN. ID RESTRICTION AT PROPOSED WHIPSTOCK SET POINT. CONSULT WITH ODE, DETERMINE NEW SET POINT. -LOG TIE-IN TO FORMATION MARKER WITH -1'CORRECTION.PICKUP,LOG CCL TO I CORRELATE CASING COLLARS. ALL GOOD. 08:00 - 08:15 0.25 WHIP P WEXIT j PLACE WHIPSTOCK ON DEPTH AT SET POINT I OF 8966',TOP OF WHIPSTOCK AT 8949'. PRESSURE UP AND SET WHIPSTOCK CONFIRMATION OF SET. PICK UP FROM WHIPSTOCK Printed 8/24/2015 10:16.46AM North America-ALASKA-BP Page 5 of 14 Operation Summary Report Common Well Name:J-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/2/2015 End Date:8/11/2015 1X3-0176G-C:(4,143,618.52) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/17/1980 12:00:00AM Rig Release:8/15/2015 Rig Contractor:NORDIC CALISTA 1 UWI:50029204.4400 Active datum:Kelly Bushing/Rotary Table @69.20usft(above Mean Sea Level) Date From-To Firs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:15 - 10:00 1.75 WHIP P WEXIT DISPLACE FROM 8.4 PPG SEAWATER TO 9.5 1 PPG MUD SYSTEM AT 2.85 BPM,2390 PSI. FLOW CHECK OFF BOTTOM,WELL STATIC. 10:00 - 12:45 2.75 WHIP P WEXIT POH TO SURFACE WITH BHA. -CONCURRENT OPS:SAFETY DISCUSSION AROUND CONTROL OF WORK AND EXCLUSION ZONES WITH WELLS OPERATIONS MANAGER AND WELLS TEAM LEAD. FLOW CHECK AT SURFACE,WELL STATIC. PJSMFOR LAYING DOWN BHA. 12:45 - 13:45 1.00 STMILL P WEXIT POP OFF AND LAY DOWN BHA. CLEAR AND CLEAN RIG FLOOR,MU AND CONFIRM I TORQUE ON SAFETY JOINT. MU 3.80" MILLING BHAAND STRING REAMER ON BHI SMART TOOLS. 13:45 - 16:30 2.75 STMILL P WEXIT MAKE UP TO COIL AND STAB ON WITH INJECTOR. RIH WITH MILLING BHA;SLACK 'OFF WEIGHT RUNNING IN HOLE 22-25K. -MW IN AND OUT 9.42 PPG -PICKUP WEIGHT AT BOTTOM 45K. RECORD SLOW PUMP RATES. 16:30 - 16:45 0.25 STMILL P WEXIT MOVE DOWN AND DRY TAG TOP OF _WHIPSTOCK AT UNCORRECTED DEPTH OF 8957.5'. PICK UP AND COME ON WITH PUMPS TO 2.85 BPM. SEE INITIAL PRESURE INCREASE AGAIN AT 8957.5'. 16:45 - 18:00 1.25 STMILL P WEXIT ;BEGIN MILLING OPS AT 2.85 BPM,2560 PSI. MW IN AND OUT 9.42 PPG,IA AT 670 PSI,OA AT 400 PSI. -MILL AT 2.85 BPM,2560-2630 PSI,WOB.8K AND ROP OF 1 FPH DURING FIRST FOOT 18:00 - 00:00 6.00 STMILL P- WEXIT CONTINUE MILLING WINDOW. BLED IA/OA DOWN 2.84 IN/OUT MW IN/OUT 9.45/9.38 8/6/2015 00:00 - 01-40 1.67 STMILL P WEXIT STRING REAMER EXIT ZERO OUT FOR BOTTOMS UP START DRILLING RATHOLE 01'40 - 06:00 4.33 STMILL P WEXIT I FINISHED MILLING RATHOLE. BEGIN BACK REAMING BLED OA 630-280 SAMPLE FROM 8972' SHOWED 2%SHUBLIK 06:00 - 07:30 1.50 STMILL P WEXIT CONDUCT REAM PASSES WHILE PUMPING UP SECOND SAMPLE AND PUMPING DOWN HI-VIS PILL. SECOND SAMPLE WAS ENTIRELY SHUBLIK. HI-VIS PILL AT BIT. DRY DRIFT,ALL GOOD. PULL INTO WINDOW, FLOW CHECK. WELL STATIC. 07 30 - 09 15 1.75 STMILL P WEXIT POH WITH BHA. PUMP AT MAX OF 4.78 BPM DUE TO PRESSURE LIMITATIONS OF 4100 PSI. OBTAINING VERY GOOD RETURNS AT THAT RATE. RETURN OF HI-VIS PILL WAS EVIDENT ACROSS SHAKER BUT DIDN'T INCREASE ANY AMOUNT OF METAL OR FORMATION RETURNS. -FLOW CHECK AT SURFACE,WELL STATIC Printed 8/24/2015 10.16:46AM • North America-ALASKA-BP • Page 6 of 14 Operation Summary Report Common Well Name:J-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/2/2015 I End Date:8/11/2015 X3-0176G-C:(4,143,618.52) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/17/1980 12:00:00AM I Rig Release:8/15/2015 Rig Contractor:NORDIC CALISTA UWI:500292044400 Active datum:Kelly Bushing/Rotary Table©69.20usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:15 - 11:00 1.75 STMILL P WEXIT POP OFF WITH INJECTOR. LD MILLING BHA. j DIAMOND WINDOW MILL GAUGE AT 3.80"GO, 13.79"NO-GO. MU 3.75"X 4.25"HYCALOG BIT TO 2-7/8"LOW SPEED MOTOR WITH 1.22° BEND AND BHI SMART TOOLS WITH RESISTIVITY TOOL. 11:00 - 13:30 2.50 DRILL P PROD1 ISTAB ON WITH INJECTOR,PRESSURE TEST DURING RUN IN. I-RIH SLACK OFF WEIGHT AT WINDOW 22K 1-LOG TIE-IN WITH-3'CORRECTION 13:30 - 18:00 4.50 DRILL P PROD1 'RIH WITH BHA THROUGH WINDOW AND INTO !OPEN HOLE. j-VERIFY ALARM SET POINTS,RECORD SLOW PUMP RATES MW IN 9.45 PPG,MW OUT 9.4 PPG -FREE SPIN OF 2780 PSI AT 2.85 BPM -INITIAL ATTEMPTS TO ENGAGE RESULT IN STALLING;ATTEMPTING TO ENGAGE WITH LIGHT WOB AT.75-.9K. BACK OFF WOB TO .6K AND ABLE TO INITIATE DRILLING. -DRILLAT.2.85 BPM,2865-2970 PSI,.5-2.1K WOB,ECD OF 9.85 PPG -IA 360 PSI,OA430 PSI 18:00 - 23:00 5.00 DRILL P PROD1 t DRILL BUILD SECTION FREE SPIN=3097 PSI AT 3.1 BPM RATE IN=2.95 BPM RATE OUT=2.95 BPM MW IN=9.47 PPG MW OUT=9.40 PPG ECD 9.87 PPG ROP=6-50'FPH WOB=1.3 K CIRC PSI= 2946 PSI IAP=441 PSI OAP=541 PSI PVT=362 BBLS 'PUMP 15 BBL Hl-VIS PILL 23:00 - 23:30 0.50 DRILL WIWI PROD1 WIPER UP OUT OF OPEN HOLE. 23:30 - 00:00 0.50 DRILL P PROD1 OPEN EDC, INCREASE RATE TO GET HI VIS SWEEP OUT 8/7/2015 00:00 - 01:00 1.00 DRILL P PROD1 1CONTINUE TO CIRCULATE HI VIS SWEEP OUT OF HOLE AT 4.7 BPM WHILE TYING IN WITH +1'CORR HI VIS ARRIVED ON TIME AND RETURNED 130-40%INCREASE IN CUTTINGS. ( CLOSE EDC, HEAD TO BOTTOM 01:00 - 07:15 6.25 DRILL P PROD1 DRILL BUILD SECTION FROM 9150'TO 9282' i FREE SPIN=3097PSI AT 3.1 BPM IRATE IN=3.12BPM RATE OUT=3.14BPM MW IN=9.48 PPG MW OUT=9.38 PPG ECD =9.91 PPG ROP=60 FPH WOB=2.0 K CIRC PSI= .3300 PSI IAP=509 PSI OAP=630 PSI PVT=363 BBLS 07:15 - 07:45 0.50 EVAL P PROD1 I CANNOT GET GOOD SURVEY DATA AT 9276'. 1 PICK UP TO LAST KNOW GOOD SURVEY 'POINT,CANNOT GET GOOD SURVEY. TROUBLESHOOT TOOL,NO APPARENT ISSUES WITH TOOL. INQUIRE WITH USGS WEBSITE,SOLAR STORM IS INTERFERING WITH SURVEY QUALITY. Printed 8/24/2015 10:16:46AM North America-ALASKA-BP 111110 Page 7 of 14 Operation Summary Report Common Well Name J-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/2/2015 End Date.8/11/2015 X3-0176G-C:(4,143.618.52) Project:Prudhoe Bay Site.PB J Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/17/1980 12:00:00AM Rig Release:8/15/2015 Rig Contractor:NORDIC CALISTA UWI:500292044400 Active datum:Kelly Bushing/Rotary Table©69 20usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:45 - 09:15 1.50 DRILL P PROD1 TIME HI-VIS PILL TO EXIT BIT OFF BOTTOM. CHASE PILL TO WMNDOW,CONTINUE TO PUMP BOTTOMS UP WITH EDC OPEN. RETURN HAD 10%INCREASE IN CUTTINGS. CHECK WITH USGS SITE,STORM SEEMS TO HAVE SETTLED DOWN. 09:15 - 13:15 4.00 DRILL P PROD1 RIH,OBTAIN TWO GOOD QUALITY SURVEYS. DRILL AHEAD AT 2.85 BPM,2650 PSI FREE SPIN INCREASE RATE TO 3.1 BPM,PRESSURE RANGE 2850 TO 3200 PSI,WOB OVER TIME INCREASED FROM 2.8K TO 4.6K,ECD OF 9.85 1 PPG,VERY SLOW ROP -MW IN 9.45 PPG,MW OUT 9.38 PPG,NO LOSSES TO FORMATION LAST HOUR OF DRILLING LESS THAN 10 FPH,MORE DIFFICULTY IN GETTING MOTOR TO STALL,PULL FOR BHA CHECK. CONFIRM ALARM SETTINGS,DYNAMIC FLOW CHECK OFF BOTTOM PER ALASKA CTD FLOW CHECK RP,FLOW CHECK GOOD. 13:15 - 16:00 2.75 DRILL P PROD1 I PULL INTO WINDOW,FLOW CHECK WHILE OPENING EDC. WELL STATIC. BRING PUMPS UP TO 5.6 BPM,4000 PSI WHILE POH TO SURFACE. NO REMARKABLE INCREASE IN CUTTINGS WITH RETURN OF LO-VIS/HI-VIS SWEEP COMBO. CONTINUE POH AT MAX RATE. FLOW CHECK AT SURFACE,WELL STATIC. PULL BHA TO TAG UP AT SURFACE. -4 BBLS LOST TO FORMATION WHEN PUMPING AT HIGH PUMP RATES 16:00 - 17:30 1.50 DRILL P PROD1 POP OFF WITH INJECTOR. LD DRILLING BHA. BIT GRADE I-DIAL UP MOTOR BEND FROM 1.22°TO 1.30° IN ATTEMPT TO TRACK DRILLING OF PLANNED DIRECTIONAL PATH -MU 3.75"X 4.25"HYC BIT TO LO-SPEED MOTOR AND BHI SMART TOOLS — _ -STAB ON WITH INJECTOR 17 30 - 20:00 2.50 DRILL P PROD1 RIH WITH DRILLING BHA TIE IN WITH-4'CORRECTION RIH TO BOTTOM. PERFORM SPR'S. 20:00 - 00:00 4.00 DRILL P PROD1 i DRILL BUILD SECTION FROM 9301 TO 9436 FREE SPIN=3018 PSI AT 3.04 BPM RATE IN=3.04 BPM RATE OUT=3.04 BPM MW IN=9.48 PPG MW OUT=9.38 PPG ECD =9.89 PPG ROP=26 FPH WOB=1.7 K CIRC PSI= 3069 PSI IAP=80 PSI OAP=300 PSI PVT=288 BBLS 8/8/2015 00:00 - 02:30 2.50 DRILL P PROD1 DRILLED TO 9500' -PUMPED 15 BBL HIVIS SWEEP, WIPER INTO CASED HOLE. OPEN EDC. INCREASE RATE TO 4.5 BPM PER SCHLUMBERGER. -PUMP BOTTOMS UP.WHEN HI VIS HIT, CUTTINGS INCREASED BY 10-20%. -TIE IN WITH+1'CORRECTION, DUMPED I PILL TO CUTTINGS BOX 20 BBL BLEDIA/OA Printed 8/24/2015 10:16:46AM • North America-ALASKA-BP • Page 8 of 14 Operation Summary Report Common Well Name:J-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/2/2015 End Date:8/11/2015 X3-0176G-C:(4,143,618.52) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/17/1980 12:00:00AM Rig Release:8/15/2015 Rig Contractor:NORDIC CALISTA UWI:500292044400 Active datum:Kelly Bushing/Rotary Table @69.20usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:30 - 06:00 3.50 DRILL P PROD1 DRILL BUILD SECTION TO 9650' FREE SPIN=2977 PSI AT 3.00 BPM RATE IN=3.07 BPM RATE OUT=3.06 BPM !MW IN=9.48 PPG MW OUT=9.43 PPG ECD =9.94PPG ROP=40-80 FPH WOB=1.8K CIRC PSI= 3193 PSI IAP=156 PSI OAP=424 PSI PVT=250 BBLS PUMP DOWN 15-BBL HI-VIS PILL FOR WIPER (TRIP 06:00 - 07:30 1.50 DRILL P PROD1 PILL OUT OF BIT. CONDUCT WIPER TRIP TO WINDOW FROM 9650'. PICK UP WEIGHT IN OPEN HOLE 40-42K,SMOOTH TRIP UP. PULL INTO WINDOWAND OPEN EDC TO CIRCULATE BOTTOMS UP IN CASED HOLE. -SWEEP RETURN WITH 30%INCREASE IN CUTTINGS,SEEING SHALE IN RETURNS I-RUN BACK DOWN CLEAN WITH 24K SLACK OFF WEIGHT -RECORD SLOW PUMP RATES 07'30 - 12:30 5.00 DRILL P PROD1 ,FREE SPIN OF 2910 PSI AT 3.0 BPM. DRILL AHEAD FROM 9650'. -TOUGH DRILLING THROUGH SECTION I FROM MD OF 9661'TO 9710';MOST LIKELY TRANSITION FROM 14N TO THE HOT -DRILLING PICKED UP TO HIGH ROP AT 9710' -3.0 BPM,3000-4000 PSI,1.35-6K WOB,ECD OF 9.95 PPG -MW IN 9.5 PPG,MW OUT 9.42 PPG,NO LOSSES TO FORMATION 12:30 - 13:30 1.00 DRILL P PROD1 WIPER TRIP TO WINDOW WHILE CIRCULATING SEVERAL SAMPLES UP FOR GEO. PICK UP HOLE CLEAN. LOG TIE-IN TO RA TAG WITH+3.5'CORRECTION. EXIT WINDOW,MOVE DOWN HOLE WITH NO ISSUES._ 13:30 - 16:15 2.75 DRILL P PROD1 ON BOTTOM AT 9800'. FREE SPIN OF 2975 PSI AT 3.0 BPM. -DRILL AHEAD RELATIVELY WELL FROM 9800' TO 9830'. ROP SLOWED AT 9840'BUT STILL DRILLING CONSISTENTLY WITH QUITE A FEW SHORT WIPERS. CONDUCT KICK WHILE DRILLING DRILL. SIMULATE INCREASE IN PITS. DRILLER PICKED UP OFF BOTTOM AND SLOWLY MOVED COIL DURING FLOW CHECK. CREW VERIFIED NO GAS AT PITS BUT GAIN IN PIT STRAP AS WELL AS SLOW FLOW AT SHAKER. SHUT IN WELL USING INJECTOR PACKOFFS AND CLOSURE OF HCR. CREW RESPONDED TO STATIONS. CONDUCT AAR. -3.0 BPM,3170-2400 PSI,1.15-4.6K WOB,ECD OF 10.0 PPG -MW IN 9.51 PPG,MW OUT 9.45 PPG,SLIGHT LOSSES ATTRIBUTED TO SHAKER AND FOOTAGE DRILLED -DIFFICULTY IN SLIDING AND IN GETTING WOB,STEADY COARSE CUTTINGS COMING ACROSS SHAKER. SEND LO-VIS FOLLOWED BY HI-VIS PILL DOWN COIL FOR WIPER TRIP TO WINDOW. Printed 8/24/2015 10:16:46AM North America-ALASKA-BP • Page 9 of 14 Operation Summary Report Common Well Name:J-10 AFE No Event Type.RE-ENTER-ONSHORE(RON) Start Date:8/2/2015 End Date:8/11/2015 X3-0176G-C:(4,143,618.52) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/17/1980 12:00:00AM Rig Release:8/15/2015 Rig Contractor:NORDIC CALISTA I UWI:500292044400 Active datum:Kelly Bushing/Rotary Table©69.20usft(above Mean Sea Level) Date From-To Hrs j Task 1 Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:15 - 18:00 1.75 1 DRILL P PROD1 CHASE PILL UP HOLE TO WINDOW PICKUP CLEAN,PUW ON TRIP 40-42K. CIRCULATING PRESSURE OF 2910 PSI AT 3.0 BPM ON TRIP UP. PULL INTO WINDOW,OPEN EDC AND PUMP BOTTOMS UP AT 4.65 BPM,4140 PSI. -NO INCREASE IN RETURNS VOLUME ACROSS SHAKER WITH SWEEP COMING ACROSS BUT LARGE AMOUNTS OF"SAND BALLS"THE SIZE OF A DIME TO HALF DOLLAR COMING ACROSS. 18:00 - 19:18 1.30 DRILL P PROD1 TIE IN WITH+2 CORRECTION RUN TO BOTTOM. PERFORM SPR'S. GET DRILLING PARAMETERS i FREE SPIN 3007 PSI @ 3.06 BPM MWIN/OUT=9.47/9.44 PPG 19:18 - 21:00 1.70 -1- DRILL P PROD1 I DRILL LATERAL FROM 9900 TO 10000' FREE SPIN a 3007 PSI AT 3.08 BPM RATE IN=3.04 BPM RATE OUT=3.04 BPM MW IN=9.48 PPG MW OUT=9.43 PPG ECD =9.99 PPG MW TEMP IN=108 DEG MW TEMP OUT= '106.7 DEG BHT=144 DEG ROP=85 FPH WOB=2.0 K CIRC PSI=3112 PSI IAP=337 PSI OAP=580 PSI PVT=261 BBLS 21 00 - 22:30 1.50 DRILL P PROD1 DRILL LATERAL FROM 10000'TO 10100' FREE SPIN=3007 PSI AT 3.08 BPM RATE IN=3.04 BPM RATE OUT=3.04 BPM MW IN=9.50 PPG MW OUT=9.43 PPG ECD =9.99 PPG MW TEMP IN=108.3 DEG MW TEMP OUT= 1107.2 DEG BHT=146 DEG ROP=85 FPH WOB=2.0 K CIRC PSI= 3600 PSI IAP=382 PSI OAP=603 PSI PVT=258 BBLS 22:30 - 00:00 1.50 DRILL PROD1 DRILL LATERAL FROM 10100'TO 10200' ,FREE SPIN=3007 PSI AT 3.08 BPM RATE IN=3.04 BPM RATE OUT=3.04 BPM MW IN=9.50 PPG MW OUT=9.45 PPG ECD =10.02 PPG MW TEMP IN=108.3 DEG MW TEMP OUT= 106.5 DEG BHT=146 DEG ROP=85 FPH WOB=2.0 K CIRC PSI= 3600 PSI IAP=416 PSI OAP=620 PSI PVT=340 BBLS bROUGHT PIT#1 INTO ACTIVE PUMPED 10 BBL LO VIS /FOLLOWED BY 20 BBL HI VIS. WIPER UP TO WHIPSTOCK 8/9/2015 100:00 - 01:00 1.00 DRILL P PROD1 FINISH WIPER UP TO WINDOW OPEN EDC. BRING RATE UP TO PUMP A BOTTOMS UP 01:00 - 02:00 1.00 DRILL P PROD1 CIRCULATE SWEEPS OUT. 50%+INCREASE IN CUTTINGS, CONTINUE TO CIRCULATE ANOTHER 80 BBLS UNTIL SHAKER CLEANED UP 02:00 03:00 1.00 DRILL P PROD1 CLOSE EDC LOG TIE IN WITH+2 RIH TO BOTTOM Printed 8/24/2015 10:16:46AM • North America-ALASKA-BP • Page 10 of 14 Operation Summary Report Common Well Name:J-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/2/2015 End Date:8/11/2015 X3-0176G-C:(4,143,618.52) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/17/1980 12:00:00AM Rig Release:8/15/2015 Rig Contractor:NORDIC CALISTA I UWI:500292044400 Active datum:Kelly Bushing/Rotary Table i 69.20usft(above Mean Sea Level) Date 1 From-To Hrs Task Code NPT NPT Depth Phase 1 Description of Operations (hr) (usft) j 03:00 - 04:30 1.50 DRILL P PROD1 FREE 3040 PSI(413.06 BPM 9.52 PPG IN /9.45 PPG OUT 3.05 BPM IN /3.05 BPM OUT PVT 332 04:30 - 07:00 2.50 DRILL P PROD1 DRILL LATERAL FROM i FREE SPIN=3040 PSI AT 3.08 BPM RATE IN=3.02 BPM RATE OUT=2.98 BPM MW IN=9.49 PPG MW OUT=9.45 PPG ECD =10.02 PPG ROP=53 FPH WOB=2.0 K CIRC PSI= 3263 PSI IAP=443 PSI OAP=671 PSI PVT=328 BBL STARTING TO HAVE ISSUES WITH SLIDE, PERFORMING A LOT OF SHORT WIPERS CONDUCTED SAFETY STANDDOWN DISCUSSION WITH DAY TEAM UTILIZING SLIDE PACKET FROM BP LEADERSHIP 07:00 - 10:15 3.25 DRILL P PROD1 CREW SWAP OUT,PREP FOR MUD SWAP ;WHILE DRILLING AHEAD. DISCUSSION AROUND LINE-UPS,FLUID MANAGEMENT AND PERMITS,HOW TO CONDUCT MONITORING. -TRUCKS LINED UP,PERMITS COMPLETE. -PUMP LO-VIS FOLLOWED BY HI-VIS PILL I FOLLOWED BY CLEAN MUD ;-MW BEFORE SWAP 9.48 PPG,CIRC j PRESSURE OF 3670 PSI AT 3.145 BPM I-PILL OUT OF BIT,MUD COMING AROUND. CONDUCT WIPER TO GET CLEAN MUD AROUND BHA IN OPEN HOLE. MOVE BACK DOWN AND DRILL AHEAD WHILE DISPLACING TO NEW SYSTEM. 10:15 - 13:00 2.75 DRILL P PROD1 MW IN 9.50 PPG,MW OUT 9.45 PPG,CIRC PRESSURE OF 3380 PSI AT 3.05 BPM WHILE DRILLING AHEAD TO GET NEW MUD AROUND. ;-PICK UP AND RECORD SLOW PUMP RATES 1-FREE SPIN OF 3000 PSI AT 3.05 BPM;IAAND 1 i OA PRESSURES DROPPED-100 PSI WITH NEW MUD -3.05-3.15 BPM,3220-3495 PSI,2.2-3.3K WOB, ;10.0PPG ECD 13:00 - 16:30 3.50 DRILL P PROD1 1CONDUCT WIPER TO WINDOW AT 3.05 BPM, 2960 PSI. PICK UP WEIGHT ON TRIP 44-46K. PULL INTO WINDOW,OPEN EDC AND PUMP AT 4.5 BPM,4000 PSI. NO CHANGE IN CUTTINGS WITH BOTTOMS UP. LOG TIE-IN WITH RA TAG WITH+3'CORRECTION. -RIH WITH NO ISSUES,SLACK OFF WEIGHT OF 27-29K. CIRCULATE AT 3.06 BPM,2950 PSI. 16:30 - 18:00 1.50 DRILL P PROD1 FREE SPIN OF 2930 PSI AT 3.05 BPM ON BOTTOM. DRILL AHEAD FROM 10,650'. NO INDICATION OF EXPECTED FAULT FROM PREVIOUS DRILLING NOR DURING TRIP. -DRILLAT 3.05 BPM,3250-3390 PSI,3.45-4.0K 1 WOB,ECD OF 10.07 PPG -MW IN 9.53 PPG,MW OUT 9.45 PPG,NO LOSSES TO FORMATION,ROP STAYING HIGH AT AVERAGE OF 60-80 FPH Printed 8/24/2015 10:16.46AM • North America-ALASKA-BP • Page 11 of 14 Operation Summary Report firfr ; *, Common Well Name J-10 AFE No Event Type.RE-ENTER-ONSHORE(RON) Start Date:8/2/2015 End Date:8/11/2015 X3-0176G-C:(4,143,618.52) Project.Prudhoe Bay Site:PB J Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/17/1980 12:00:00AM Rig Release:8/15/2015 Rig Contractor:NORDIC CALISTA UWI.500292044400 Active datum:Kelly Bushing/Rotary Table©69.20usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 18:00 - 19:00 I 1.00 DRILL P PROD1 NIGHT TEAM CONDUCTED SAFETY STANDDOWN DISCUSSION UTILIZING THE SLIDE PACKET FROM BP LEADERSHIP. DAY TEAM CONTINUED DRILLING AHEAD 19:00 - 22:30 3.50 DRILL P PROD1 CONTINUED TO DRILLAHEAD. STARTED GETTING DIFFERENTIALLY STUCK. GET FREE. PERFORM LONG WIPER. PUMP 10 LO VIS/20 HIGH VIS. CHASE OUT OF LINER. I OPEN EDC. MAX RATE TILL SWEEPS AT ,SURFACE. SMALL INCREASE IN CUTTINGS 22:30 - 23:30 1.00 DRILL P PROD1 LOG+3'TIE IN RUN TO BOTTOM 23:30 - 00:00 0.50 DRILL P PROD1 DRILL LATERAL SECTION FREE SPIN=2950 PSI AT 3.10 BPM RATE IN=3.10 BPM RATE OUT=3.10 BPM MW IN=9.53 PPG MW OUT=9.45 PPG ECD =10.04 PPG MW TEMP IN=111.3 DEG MW TEMP OUT= 108.8 DEG BHT=156 DEG ROP=20 FPH WOB=3.0 K CIRC PSI= 3400 PSI IAP=515 PSI OAP=718 PSI PVT=384 BBLS 8/10/2015 00:00 - 03:30 3.50 DRILL P PROD1 DRILLING AHEAD 03:30 - 05:00 1.50 DRILL P PROEM -PERFORM WIPER TO WINDOW PUMPED 10 LO VIS/20 HIVIS 05:00 - 06:00 t 1.00 DRILL P PROD1 OPEN EDC PUMPING AT 4.7 BPM FOR A BOTTOMS UP SMALL INCREASE IN CUTTINGS PERFORM TIE IN. WELL STATIC WITH PUMPS OFF 06:00 - 06:45 0.75 DRILL P PROD1 !RUN BACK IN HOLE WITH NO ISSUES. ENCOUNTERING MORE RESISTANCE ON 1 TRIP IN WITH SLACK OFF WEIGHT LOWER TO 22-24K. 06.45 - 12:00 5.25 ( DRILL P PROD1 I ON BOTTOM,RECORD SLOW PUMP RATES. j WSL DISCUSSING OPTIONS FOR DRILLING !AHEAD WITH TOWN. 1-DRILL AHEAD AT 3.05-3.15 BPM,3060-3260 PSI,1.7-2.25K WOB,ECD 9.9 PPG MW IN 9.54 PPG,MW OUT 9.47 PPG,SLIGHT LOSSES TO FORMATION DURING DRILLING AHEAD -HIT ROADBLOCK,CANNOT MAKE ANY MORE PROGRESS WITH SEVERAL ATTEMPTS TO DRILL AHEAD. MOST LIKELY CAP TO THE 14N FORMATION. PUMP DOWN 15 BBL LO-VIS FOLLOWED BY 10 BBL HI-VIS PILL. PILL OUT OF BIT,BEGIN TRIP OUT OF HOLE. -RETURN OF SWEEP DID NOT MAKE A NOTICEABLE DIFFERENCE IN RETURNS Printed 8/24/2015 10:16 46AM North America-ALASKA-BP • Page 12 of 14 Operation Summary Report Common Well Name:J-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/2/2015 End Date:8/11/2015 X3-0176G-C:(4,143,618.52) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/17/1980 12:00:00AM Rig Release:8/15/2015 Rig Contractor:NORDIC CALISTA UWI:500292044400 Active datum:Kelly Bushing/Rotary Table(g69.20usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 16:15 4.25 DRILL P PROD1 PULL UP HOLE CHASING SWEEP UP HOLE. INITIAL PICK UP CLEAN. PUW ON TRIP UP 42-44K. CIRC PRESSURE OF 3000 PSI AT 3.1 BPM. I-PULL INTO WINDOW,FLOW CHECK WHILE OPENING EDC. NO FLOW,WELL STATIC. BRING ON PUMPS TO 4.5 BPM,3830 PSI. TRIP TO SURFACE WITH GOOD RETURNS THE ENTIRE TIME,NO SLUGS OR LOAD-UP ACROSS SHAKER. SLIGHT LOSSES TO FORMATION AT HIGH PUMP RATES. -PJSM ON LAYING DOWN BHA. PULL TO SURFACE WITH BHA BELOW STACK FLOW CHECK. WELL STATIC. 16:15 - 17:30 1.25 DRILL P PROD1 PULL TO SURFACE,TAG UP. POP OFF WITH •INJECTOR,LAY DOWN BHA. BIT GRADE 2-3-CT. -FUNCTION TEST BOP AGAINST 2-3/8"TEST JOINT FROM CTS CONSOLE -MAKE UP HUGHES 3.75"X 4.25"BIT TO LO-SPEED MOTOR WITH 1.6°BEND AND NOV AGITATOR TO BHI SMART TOOLS. 17:30 - 21:00 3.50 DRILL P PROD1 'RIK WITH NEW BHA. 21:00 - 00:00 3.00 DRILL P PROD1 PERFORM TIE IN+3 PERFORM SPR'S ' FREE SPIN 3464#@ 2.81 BPM 9.57 PPG IN /9.45 PPG OUT DRILLING AHEAD. PERFORMING WIPERS AS NEEDED 8/11/2015 00:00 - 01:00 1.00 DRILL P I PROD1 GETTING MOTOR WORK BECOMING ISSUE. SUSPECT POSSIBLE BALLING OF BIT. WEIGHT TRANSFER NOT AN ISSUE. 01:00 - 01:30 0.50 DRILL P PROD1 CONDUCT HIGH LEL GAS ALARM DRILLAT SHAKERS. 1-DISCUSS EACH STEP THROUGH THE 1 PROCEDURE WITH CREWS. -EVERYONE WAS AWARE OF THEIR ROLE AND ANSWERED VERY WELL. -DISCUSSED ESD LOCATIONS AND RUNNING EQUIPMENT AROUND RIG 01:30 - 01:45 0.25 DRILL P PROD1 GETTING GOOD WEIGHT TRANSFER. BUT NO MOTOR WORK. PUMPED 20 BBLS OF HI VIS WHILE PULLING WIPER CLEARED UP BIT. 01:45 - 06:00 4.25 DRILL P PROD1 DRILL LATERAL SECTION FROM 11341'TO 11400' FREE SPIN=3465 PSI AT 2.81 BPM I RATE IN=2.45-2.78 BPM RATE OUT= 2.42-2.76 BPM MW IN=9.58 PPG MW OUT=9.46 PPG ECD =10.10 PPG MW TEMP IN=108.2 DEG MW TEMP OUT= 106.7 DEG BHT=168 DEG ROP=VARIABLE FROM 8-60 FPH WOB=3-6 K CIRC PSI=3100-3900 PSI IAP=514 PSI OAP=347 PSI PVT=315 BBLS DISCUSSIONS WITH GEO REGARDING SAMPLES SHOWING 20%CHERT/AND COULD GET AS BAD AS 40%CHERT. Printed 8/24/2015 10:16:46AM • North America-ALASKA-BP • Page 13 of 14 Operation Summary Report Common Well Name:J-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/2/2015 End Date:8/11/2015 X3-0176G-C:(4,143,618.52) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/17/1980 12:00:OOAM Rig Release:8/15/2015 Rig Contractor:NORDIC CALISTA UWI:500292044400 Active datum:Kelly Bushing/Rotary Table©69.20usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 08:30 2.50 DRILL P PROD1 DRILL AHEAD IN LATERAL SECTION WITH FREQUENT WIPERS. VIBRATORY TOOL WORKING QUITE WELL BUT ENCOUNTERING A LOT OF PUMP PRESSURE FLUCTUATIONS. DIFFERENTIAL PRESSURES BETWEEN BORE 1ANDANNULUS WERE IN 1200 PSI RANGE WITHOUT VIBRATORY TOOL;OPERATING WITH 1800-2100 PSI DIFFERENTIAL DURING THIS DRILLING PERIOD. HAD TO USE LOWER FLOW RATE TO DRILL IAHEAD WITH PRESSURE LIMITATIONS. FLOW RATE DURING DRILLING 2.37-2.45 BPM, ( 3960-4100 PSI(FREE SPIN OF 2600 PSI AT 2.45 BPM),3.36-6.0K WOB,ECD OF 10.0 PPG. -ATTAINED TARGET TVDSS OF 8910'AT 11,366'MD. -CALL TD AT 11,463'MD UNCORRECTED• DEPTH MW IN 9.58 PPG,MW OUT 9.48 PPG,SLIGHT I LOSSES TO FORMATION DURING DRILLING 08:30 - 11:15 2.75 DRILL P PROD1 RECIPROCATE WHILE PUMPING DOWN LO-VIS AND HI-VIS COMBINATION PILL. PILL 'OUT,BEGIN CHASING UP HOLE AT 2.35 BPM, «3100 PSI. -BEGIN TO HAVE ERRATIC PUMP PRESSURE SPIKES AT 10,750'ON TRIP UP. PRESSURE DROPPED OFF-600 PSI,THEN SHOT BACK UP-1200 PSI. AVERAGING CIRC PRESSURE OF 2820 PSI AT 2.35 BPM. -PULL INTO WINDOW AND OPEN EDC. LOG TIE-IN WITH+3.5'CORRECTION. PICK UP HOLE TO CLEAN WELLBORE WITH BPM, XXXX PSI. PICK UP TO ABOVE 4-1/2"TUBING TOP AT 8212'TO LOG CCL. 11:15 - 11:30 0.25 DRILL P PROD1 LOG DOWN FOR CCL FROM 8175'. 11:30 - 14:10 2.67 DRILL P PROD1 RIH TO TAG CORRECTED TD OF 11461.6' DROP BACK RATE FOR DYNAMIC FLOW CHECK/START LINER RUNNING PILL WHILE MOVING PIPE. .68 BPM IN/.41 BPM OUT (.225 BPM OF PIPE DISPLACEMENT)DYNAMIC I FLOW CHECK GOOD. SLIGHT LOSSES. CONTINUE LAYING IN LINER RUNNING PILL 14:10 - 14:35 0.42 DRILL P PROD1 FINISHED LAYING IN LINER RUNNING PILL. AT WINDOW PERFORM FLOW CHECK I WHILE OPENING EDC WELL IS STATIC COME ONLINE AT 4.6 BPM i 4000#. _ 14:35 16:30 1.92 ' DRILL P PROD1 PAINT WHITE FLAG AT 8085.20'BIT DEPTH -85.33'=EOP OF 7999.87' PAINT YELLOW FLAG AT 5585.3'BIT DEPTH-85.33=EOP OF 5499.97' CONTINUE OUT OF HOLE PULLING AT 60% 9.59 PPG IN/9.46 PPG OUT 4.55 BPM IN/4.21 --- - 'BPM OUT 16:30 - 17:30 1.00 DRILL P PROD1 FLOW CHECK AT 200 FT IS DRY. CONTINUE POOH AND TAG STRIPPER. UD BHA,BIT IS 6-2 VERY WORN ON THE NOSE. PURGE BHA WITH AIR AND WATER. 17:30 - 17:50 0.33 DRILL P PROD1 CUT OFF CT CONNECTOR. PREP TO PUMP SLACK OUT OF CT. 17:50 - 18:10 0.33 DRILL P PROD1 CREW CHANGE AND RIG CHECKS. Printed 8/24/2015 10:16:46AM • North America-ALAI„. „,-,,E3,1.3SA • Page 14 of 14 Operation Summary Report Common Well Name:J-10 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/2/2015 End Date:8/11/2015 X3-0176G-C:(4,143,618.52) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/17/1980 12:00:00AM Rig Release:8/15/2015 Rig Contractor:NORDIC CALISTA UWI:500292044400 Active datum:Kelly Bushing/Rotary Table©69.20usft(above Mean Sea Level) Date From-To Hrs Task Code NPT II NPT Depth I Phase Description of Operations (hr) 1 (usft) 18:10 - 18:30 0.33 DRILL P PROD1 PJSM FOR PUMPING SLACK. CUT OFF ABOUT 10 FT OF CT TO ELIMINATE A j FLAT SPOT. I I LINE UP INJECTOR OVER CIRC HOLE AND PUMP SLACK FORWARD. i PUMP OUT 234 FT OF CABLE SLACK,ALL THERE IS ACCORDING TO SLB SPREADSHEET. 18:30 - 21:00 2.50 DRILL P PROD1 INSTALL CABLE BOOT. � INSTALL BAKER CT CONNECTOR,PULL TEST TO 35K,GOOD. PRESSURE TEST CT CONNECTOR TO 250/ 3500 PSI,GOOD I PUMPEDAND RECOVERED 3/4"DRIFT BALL. SET INJECTOR ON LEGS. RIG UP FLOOR FOR LINER Printed 8/24/2015 10.16.46AM • S North America-ALASKA-BP Page 1 of 6 e Operation Summary Report Common Well Name:J-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/11/2015 End Date:8/15/2015 X3-0176G-C:(1,237,059.80) , Project:Prudhoe Bay Site:PB J Pad I Rig Name/No.:NORDIC 2 Spud Date/Time:7/17/1980 12:00:00AM Rig Release:8/15/2015 Rig Contractor:NORDIC CALISTA I UWI:500292044400 Active datum:Kelly Bushing/Rotary Table @69.2ousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) — (usft) 8/11/2015 121:00 - 00:00 � 3.00 CASING 4 P ; RUNPRD PJSM, MAKE UP LINER PER APPROVED i TALLY' 8/12/2015 !00:00 - 05:00 5.00 CASING 1 P RUNPRD MAKING UP LINER STABBED ON WITH INJECTOR. PT QTS, LOW AND HIGH 05:00 - 07:30 2.50 CASING P RUNPRD RIH WITH LINER FIRST FLAG IS-9.3 FT OFF,NO CORRECTION MADE. !STACK WT AT 10240 FT,PICK UP IS 65K AND WORK THROUGH. WORK DOWN TO 10429 FT,DIFFICULT TO PASS THIS SPOT. CONTINUE WORKING PIPE AT VARIOUS 'RUNNING SPEEDS AND PUMP RATES,ABLE TO WORK PAST. STACKING WT EVERY 10-20 FT,NOT CORRELATED TO ANY SHALE ZONES. LIKELY PUSHING CUTTINGS,KEEP PUMP RATE AS HIGH POSSIBLE IN THIS SECTION. 07:30 - 08:30 1.00 CASING P RUNPRD WORK LINER DOWN TO 10523 FT,STILL WORKING PIPE. i , [PICKUPS IS CLEAN AROUND 65K. ' BUILD 50 BBLS 5%LUBE PILL IN PITS,MUD LUBES AT 2%NOW. WORK LINER DOWN TO 10996 FT. 08:30 - 09:00 0.50 CASING P RUNPRD CONTINUE WORKING LINER DOWN. I ,DIFFICULT TO PASS 10996 FT. I PICK UP AND START LOSING GROUND, STACKING WEIGHT HIGHER UP. , PICKUPS STILL CLEAN AROUND 60-65K. WORK PIPE DOWN TO 11120 FT. 09:00 - 11:00 2.00 1 CASING P RUNPRD I CONTINUE WORKING LINER DOWN. I PUMP 10 BBLS HI-VIS SWEEP AROUND. !WORK PIPE DOWN TO 11267 FT,NO FURTHER PROGRESS. PUMP 50 BBLS 5%LUBE PILL DOWN. 11:00 - 11:30 0.50 CASING P RUNPRD WORK PIPE AFTER LUBE PILL COMES AROUND,ABLE TO GET TO 11300 FT. SHALES IN THIS SECTION,DROP PUMPS TO ZERO TO PUSH THROUGH. CONTINUE WORKING PIPE,PUMPS ON, PUMPS OFF,VARIOUS RUNNING SPEEDS. !GET MINERAL OIL TRAILER SPOTTED AND KCL TRUCK HOOKED UP. 1 GO PAST 2ND FLAG AT 11354 FT(11344 FT CALCULATED). WORK LINER DOWN TO 11469 FT,HAVE FOUND TD. ' UP WEIGHT HERE IS 55K. 11:30 - 12:00 0.50 CEMT P RUNPRD REVIEW BALL DROP PROCEDURE WITH SLB CREW. DROP 5/8"STEEL BALL TO RELEASE FROM LINER. LAUNCH BALL WITH 2500 PSI,BALL IS HEARD I ROLLING AND LEAVING REEL HOUSE. 1 BALL ON SEAT AT 45 BBLS,SHEARS AT 4000 PSI. Printed 8/24/2015 10:17:19AM • North America-ALASKA-BP • Page 2 of 6 Operation Summary Report Common Well Name:J-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/11/2015 End Date:8/15/2015 X3-0176G-C:(1,237,059.80) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/17/1980 12:00:00AM Rig Release:8/15/2015 Rig Contractor:NORDIC CALISTA UWI:500292044400 Active datum:Kelly Bushing/Rotary Table @69.20usft(above Mean Sea Level) Date From-To 1 Hrs Task 1 Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 17:00 5.00 CEMT P fi RUNPRD PICK UP TO BREAKOVER+2 FT TO CONFIRM OFF LINER. NEW UP INT IS 34K. SWAP WELL OVER TO KCL. SEND KCL TO CEMENT UNIT FOR PT OF THEIR LINES WHILE SWAPPING WELL OVER. WITH KCL AROUND 1.5 BPM=490 PSI. 17:00 - 17:40 0.67 CEMT P RUNPRD PERFORM PRESSURE XCHECK VERIFICATION WITH SLB CEMENT SUPERVISOR AND WSL. PT CEMENT LINES TO 250/5000 PSI,GOOD. SAFETY MEETING WITH NORDIC AND SLB 1 CREWS FOR PUMPING CEMENT. DISCUSS EXCLUSION ZONES AND SHIFT HANDOVER DURING PUMPING OPERATIONS. 17:40 - 18:30 0.83 CEMT P - RUNPRD BATCH UP 42.4 BBLS OF CEMENT. 18:30 - 22:00 3.50 CEMT P RUNPRD PUMP 5 BELS EXHAUST PILL THEN SHUT DOWN RIG PUMP. LINE UP TO PUMP FROM CEMENT VAN INTO CT. - -LOAD 42.4 BBLS CEMENT INTO REEL. -COME ONLINE BEHIND CEMENT WITH RIG .PUMPS. --AT 84.2 BBLS AWAY, ZERO OUT MM. (CEMENT AT SHOE) -AT 99 BBLS AWAY ON IN, (9.6 OUT) PU 13'PAST BREAKOVER AND SET BACK 1 DOWN TO LAUNCH PEE WEE DART. PRESSURE UP TO 1000#TO VERY PEE WEE DART LAUNCHED. PICKED UP TILL PRESSURE PORTS OPENED FOR SIDE I EXHAUST. EXHAUSTED 2 BBLS CEMENT AND 13.8 BBLS OF EXHAUST. OPENED BAKER CHOKE AND STACK BACK DOWN. -PRESSURED UP TO 1000#, ZERO IN MM. LINER WIPER PLUG LAUNCHED AT 3000# -DISPLACED LWP AT 2.0 BPM AT 3000# I CALCULATED BUMP VOLUME 25.4 BBLS. PUMPED 25.9 BBLS. DID NOT SEE A BUMP. WHEN-WE SHUT PUMPS DOWN. IT HELD THE 3000#. BLED BACK THRU BAKER CHOKE. FLOATS ARE GOOD. -OFF BOTH MM AND GAUGE PIT. CALCULATED CEMENT BEHIND PIPE IS 35 BBLS. -CLOSED BAKER CHOKE.PRESSURE UP TO 1000# PU TILL PRESSURE FELL OFF. CIRCULATED ANOTHER 5 BBLS OF EXHAUST ABOVE LINER. 1-POOH WHILE MAINTAINING.5 BPM RETURNS 22:00 - 22:10 0.17 CEMT P RUNPRD 'AT SURFACE. PERFORM 10 MIN FLOW CHECK. WELL IS STATIC. PJSM. LAY DOWN BHA AND REHEAD. 22:10 - 00:00 1.83 CEMT N CEMT RUNPRD INSTALLED CTC. PULL TEST TO 30K. PT TO 3500# Printed 8/24/2015 10:17:19AM • North America-ALASKA-BP III Page 3 of 6 Operation Summary Report Common Well Name:J-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/11/2015 End Date:8/15/2015 X3-0176G-C:(1,237,059.80) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/17/1980 12:00:00AM Rig Release:8/15/2015 Rig Contractor:NORDIC CALISTA UWI:500292044400 Active datum:Kelly Bushing/Rotary Table @69.20usft(above Mean Sea Level) Date From-To Hrs Task I Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 8/13/2015 00:00 - 04:00 4.00 CEMT N CEMT RUNPRD RIH WITH 2.74"MILLING BHA ENTER LINER. 1.81 BPM AT 2100# RIH TO A I I TAG DEPTH OF 11425.8' IMMEDIATE MOTOR I WORK SEEN. 3-1/4"X 2-7/8"X-OVER SHOULD I BE AT 11424. PERFORM DYNAMIC FLOW CHECK. 1:1. PULL OUT OF HOLE 04:00 - 06:00 2.00 CEMT N CEMT I RUNPRD I CONTINUE PULLING OUT OF HOLE STOP PULLING OUT WHEN WE GOT ABOVE LINER. 'NEEDED TO VAC OUT CUTTINGS BOX. RETURNS SHOWED CEMENT. 06:00 - 06:40 0.67 CEMT N CEMT RUNPRD I CONTINUE POOH,RETURNS CLEANING UP SLOWLY. i 06:40 - 08:20 1.67 CEMT N FLUD RUNPRD STOP POOH,WAIT FOR 1 TRUCK OF KCL AND 1 EMPTY VAC TO ARRIVE TO CONTINUE I I I FLUID TRANSFERS. STILL GETTING CEMENT CONTAMINATED RETURNS BACK. LEAK ON SLB POWER PACK IS FOUND. I CONDUCT PJSM AND REVIEW SLB PROCEDURE FOR SHUTTING DOWN POWER PACK WITH CT IN THE WELL. ' REVIEW NORDICS LO/TO PROCEDURE FOR THIS OPERATION. CLOSE BOP RAMS AND LO/'TO. CHANGE OUT JIC FITTING ON POWER PACK ' REMOVE LO/TO AND TEST NEW FITTING, GOOD. I I OPEN BOPS AND PULL BACK TO INSPECT 1 PIPE,GOOD. 08:20 - 10:00 I 1.67 CEMT N CEMT RUNPRD CONTINUE POOH. CONDUCT PJSM FOR CHANGE OUT BHA WHILE POOH. 10:00 - 10:45 1 0.75 CEMT N CEMT RUNPRD TAG STRIPPER,10 MIN FLOWCHECK IS GOOD. 'UD BHA#9,CLEANOUT ASSEMBLY. MILL IS _ 1 2.73"NO-GO. 10:45 - 1 0.75 EVAL P OTHCMP M/U BHA#10,RPM LOGGING TOOLS+2 JTS CSH. BHA OAL=113.70 FT MAX OD=2.50" 11:30 - 13:15 1.75 EVAL P OTHCMP RIH BHA#10. RIH TO 8900 FT AND START LOGGING DOWN FROM THERE,30 FT/MIN. WT CHECK AT 8900 FT IS 45K. __ 13:15 - 14:45 1.50 EVAL P OTHCMP LOG DOWN FROM 8900 FT AT 30 FT/MIN. LIGHT TAG AT 11,429 FT. 14:45 - 17:05 2.33 EVAL P OTHCMP I LOG UP AT 20 FT/MIN FROM 11,429 FT .UNCORRECTED. FLAG PIPE AT 10,100 FT EOP. LOG TO 8900 FT THEN INCREASE SPEED TO 60 FT/MIN. LOG UP TO 8150 FT. 17:05 - 19:00 1.92 EVAL P OTHCMP STOP AT 8150 FT FOR 1 MIN,FINISHED , I ,LOGGING. TOOL IS SCHEDULED TO SHUT OFF AT 17:09. CONTINUE POOH. Printed 8/24/2015 10:17:19AM 110 North America-ALASKA-BP Page 4 of 6 Operation Summary Report Common Well Name:J-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/11/2015 End Date:8/15/2015 X3-0176G-C:(1,237,059.80) 1 Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/17/1980 12:00:00AM Rig Release:8/15/2015 Rig Contractor:NORDIC CALISTA UWI:500292044400 Active datum:Kelly Bushing/Rotary Table©69.20usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) 19:00 21:10 2.17 EVAL P OTHCMP PERFORMED 10 MINUTE FLOW CHECK AT 200' WELL STATIC. 1 LAY DOWN BAKER ATLAS RPM TOOL AND 1 DOWNLOAD. GOOD DATA. SEND TO TOWN FOR EVALUATION. PJSM. PREP FLOOR FOR I PERF GUNS. -PREPARE FOR A LINER LAP TEST WHILE WAITING ON DATA. CEMENT WAS AT A FINAL COMPRESSIVE STRENGTH OF 2097PSI 'AS OF-14:00 (08-13-15)PERFORMED A PASSING LINER LAP TEST TO 2400#. LOST 36#FIRST 15 MIN/11#SECOND 15 MIN FOR TOTAL LOSS OF 51# BLEED DOWN. 21:10 - 00:00 2.83 PERF P OTHCMP BRING PERF GUNS IN. NEW UPDATED PERF MEMO ARRIVED. PJSM. WALK DOWN GUN LAY OUT WITH TCP. MAKE ANNOUNCEMENTS AND MAKE CELLAR AND RIG FLOOR EXCLUSION ZONES TILL PERF GUNS 300'IN HOLE CONTINUE MAKING UP GUNS. 8/14/2015 00:00 - 02:00 2.00 PERF P OTHCMP FIN{SHED MAKING UP GUNS/MAKE UP FIRING HEAD AND REMAINDER OF BHA STAB INJECTOR, PT QTS. 02:00 - 04:30 2.50 PERFP OTHCMP RIH �, STOP AT FLAG 11313.28'. CORRECT DEPTH I TO 10095'CORRECTED EOP+ 11206.16'=11301.16'EOT. RIH AND LIGHTLY 1 TAG PBTD. 11418' PU TO 11292.77. TRYING 1 TO GET SATELLITE TO PICK UP FOR SHOT DETECTION. 04:30 - 07:00 2.50 PERF P OTHCMP PERFORMING FIRING SEQUENCE FIRED GUNS WHILE SLOWLY MOVING. GUNS FIRED ON DEPTH. INTERVALS SHOT 10180'TO 10640' 10780'TO 11160' 11270'TO 11290' LOST 5 BBLS TO FORMATION. SHOT DETECTION PICKED GUNS FIRING. POOH WHILE MAINTAINING 200 PSI BACK PRESSURE. 07:00 - 09:00 2.00 PERF P OTHCMP PULL TO 8200 FT AND FLOW CHECK WELL FOR 10 MIN. TRIP SHEET IS-13 BBLS TO THIS POINT. FLOW CHECK IS DRY. CONTINUE POOH. STOP 500 FT FROM SURFACE,FLOW CHECK AND PJSM WITH SLB LOGGING CREW. 1 FLOWCHECK IS DRY,TRIP SHEET IS-38 BBLS TO THIS POINT. Printed 8/24/2015 10:17:19AM • North America-ALASKA-BP • Page 5 of 6 Operation Summary Report Common Well Name:J-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/11/2015 End Date:8/15/2015 X3-0176G-C:(1,237,059.80) Project:Prudhoe Bay Site:PB J Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/17/1980 12:00:00AM Rig Release:8/15/2015 Rig Contractor:NORDIC CALISTA UWI:500292044400 Active datum:Kelly Bushing/Rotary Table©69.20usft(above Mean Sea Level) Date From-To Hrs Task Code I NPT j NPT Depth ' Phase Description of Operations (hr) (usft) 09:00 - 12:30 3.50 PERF P 1 OTHCMP TAG STRIPPER AND OPEN RISER. 'L/D 2 JTS OF CSH. LID 53 PERF GUNS AND FIRING HEAD. ALL SHOTS FIRED. I WHILE L/D GUNS CONDUCT KICK WHILE !TRIPPING DRILL WHILE MOTORMAN IS I iRUNNING RIG. l '1CORRECT RESPONSE FROM NORDIC CREW I AND SLB TCP CREW,PICK UP A SAFETY JT AND MAKE UP WITH XO TO SLB GUNS. DISCUSS WITH MOTORMAN AND CREW NEXT 1,STEPS FOR SHUTTING WELL IN,AND CONDUCTAAR. CONTINUE LID GUNS. 12:30 - 14:00 1.50 PERF P OTHCMP ALL GUNS L/D,ALL SHOTS FIRED. OFFLOAD PERF GUNS,RIG DOWN SLB TCP EQUIPMENT. 14:00 - 15:00 1.00 BOPSUR P 1 POST PJSM THEN M/U SWIZZLE NOZZLE TO CLEAN ' BOP STACKOUT. A LOT OF CEMENT RETURNS WERE SEEN DURING THE 1 I CLEANOUT RUN AND AFTERWARDS. 15:00 - 16:30 1 1.50 WHSUR I P l POST I TAKE OFF SWIZZLE AND PUT ON DOWNHOLE ' NOZZLE. M/U INJECTOR,CONDUCT PJSM WITH LRS CREW. RIH TO 2500 FT AND FREEZE PROTECT. I :LAY IN DIESELAND POOH 3.0 BPM/78 IFT/MIN. , WHILE LAYING IN DIESEL N2 UNIT GETS I COOLED DOWN AND PT. WSL AND N2 SUPERVISOR PERFORM PRESSURE XCHECK VERIFICATION PRIOR TO - PT. 16:30 - 18:30 I 2.00 WHSUR P POST PULL UP AND CLOSE SWAB. ' PURGE REEL WITH N2,ALLOW IT TO BLEED OFF. 18:30 - 21:00 2.50 WHSUR P POST PREP FOR REEL PULL BACK I-DISCUSS WITH CREW OCN#4 NOT SETTING j BPV PRIOR TO RIG MOVE. DISCUSS WITH SUPERINTENDENT/ODE ABOUT NOT PUMPING METHANOL INTO ' TREE. WITH WARM WEATHER AND GREASE ' 'CREW COMING IN POST RIG MOVING OFF. I � WILL PUT IN HANDOVER TO WELLS GROUP 21:00 - 00:00 3.00 WHSUR P � I POST PULL TESTED GRAPPLE, PULL PIPE ACROSSED AND SECURE TO REEL. HAVING TO DRILL NEW HOLES FOR SHIPPING BAR 1 I I PERFORMED LO/TO HAVE ISSUES GETTING PINS OUT OF REEL. I I I OPEN UP BOTTOM SETS OF RAMS. NO ,PROBLEMS. CONTINUE TO NIPPLE DOWN BOPE Printed 8/24/2015 10:17:19AM • North America-ALASKA-BP IIII Page 6 of 6 Operation Summary Report Common Well Name:J-10 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/11/2015 End Date:8/15/2015 X3-0176G-C:(1,237,059.80) Project:Prudhoe Bay I Site:PB J Pad Rig Name/No.:NORDIC 2 Spud Date/Time:7/17/1980 12:00:00AM I Rig Release:8/15/2015 Rig Contractor:NORDIC CALISTA j UWI:500292044400 Active datum:Kelly Bushing/Rotary Table @69.20usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) i— _ (usft) 8/15/2015 I 00:00 - 03:00 3.00 WHSUR � POST RELEASE RIG AT 03:00 I I i DISCUSSED PRIOR TO MOVE WITH ALL INVOLVED THE CRITERIA OF OCN#4 I -PHYSICAL BARRIERS IN PLACE(12 X 12 CHOCKS)TO KEEP FROM ROLLING INTO I WELL I I -ESD IN CELLAR MANNED BY NORDIC -SUPERINTENDENT AND WAS TESTED PRIOR I TO MOVING OFF , i -RADIO COMMUNICATION WAS VERIFIED I f PRIOR TO MOVING I I-AGREED UPON COMMAND"STOP" IUNDERSTOOD. -ALL INVOLVED WERE AWARE OF THE BPV NOT BEING INSTALLED -DISCUSSED ROLES AND RESPONSIBILITIES WITH CREWAND ASSIGNED LOCATIONS , AROUND RIG FOR SPOTTING -SITE CONTROL TASKED WITH KEEPING AREA CLEAR--OF NON ESSENTIAL I IPERSONNEL i Printed 8/24/2015 10:17:19AM • ! II W MI i LI Me `g_ m 0- 03 I Q Cl) Q J � Q 0- cu I cu cc ct•v i >+ cu a) E m = ul Q ccn m N t ° -0 -7 — v • ° E (C ' a a O a o o 0) = Q Z a: a. .2) o LL M • •_ _ - , (7, W �': , .s iii Wa a �.� � � vim ° coAna co r` o a= O O a' o o oo) o 0 0 coco co rn n n N •o m • Q 0 0 o m r-- c a_ N N _ t O O CO co U U d Q a n Q H O aC ZS 0 um zm m O a U N O O O Y C 8 O a L a' N N _ N N U C L• C 0 _, Et .. Tu_ 00 m 0 Et (? 0) 03 N . • N .� 2 C 03 0) 6 7 J N , )2 C 0 ami C C v a+ C Y Y H W `� w « rn o D D C 0 c o " N J J 0 d > 0i C V O V 7 • gU 73 M C 0 o ii J J U ' L w N c-, N ) o m c K 2 H C N .. o I N c c o m c Er_-O o • u m ° m co O N d w co 0 N O o 2 `,6 0 0 5,'N 0 0 .0 N O U N d a' T A r O O O a) V 0 a• r Z a N I-• O v v N N :" 0 > _ 0 T D N N 5 co _1 1- 2 Z fn 0 N N N O O O O N CO 0 0 0CD N N co NI- LOt d d ,:0 c7 ate) CO� CD Q Y... N a CL s I o t CO r o = o C — o c o 0 O W c o IL ici as cv as co co ai : co us t a' p) a E c •t c m N O N 2 I .0 L , ,,i Z W N C y — A Z W C -' N _ '' O a, a O 1 0 J Z = O 1I Q F Q 1 I N 1 ' } O N m Q us O ° m S c a m D o ce I I,. N a g y a .) cn I ' r ISI a (V m t D ' CO o N N I L X z 0 3 DI trl. m a X 0 O O 01 d 0 W U 3 O O O I 0 N z 1- O O O O N m N 0 O N N (� V O Oas o d Q L C Q co a 7 m co 0 m 3 'O N N —s O O Z m O `mm o R. m v) 2 Y Q L d DQ N 14 Z W r -0 —) C300 D Z < o 2 in z a a - - cZ . a r' r E N , m mII 2 o o c 2 c ' iri .v d « = +' m �I, cNi « to 0, _ _ C .. E .. N C N C H C ,,i d ._ 0 .. N 06 U O C U >""N O Y O a0+ O c C Z c0 m ty� O- y .. d of y fq D N a a C 0 O O "�N*" o « m m y Q m a0i m • « o m m .y m m d c ` NI U a m3 0 a c� 2 m inu a° 3 3 o. z' 2 o a > > rAlt_ O () CO N O N CO 0) O n N O V N n CO M CO (O . y O 0 s- N a- a- N N 0) 0 a- CO 0 M 0 0 U) Cr 0 COlo W O O O O O O O O O N N M M M M M M M N N ' 111 Isi — `W y 0 O O • 7 Z Z (00 CO N N UJ O 0 Q N N O CMO CO O CO] N- 0) 0) CO N 0) CO CO CO N 0 N no CO co N N m O a r r r 0 (D (D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 Z Ta T3 J 0 1212 0 - (0• Z` 0 . m y n- O O 2 Y a a (0 N (O 0) 0) � � 0 N V_ (D n CO CO n n CO 0) CO CO N N- 0) Cr 0 CO CO M NNO N V CO O (O0 V O (O 4 O (0 0 M M O Nn N L L 0 . MM M MM C) () V 6 O n n O O co O O on O n n o j j E co 1 V V V V V Cr V V V V4 V V V VV V V V V Cr 12 00000 N N N (0 0 V) O O .0 In 00000 O m m E 2 g u) CO- v CO- v V v v co- co- c v co- co- co- co- v co- v co- co- co- - ` C IY (O (0 (O CO (D (O (O (O (O (O CO (O (O (0 (O CO CO CO (O (O CO Y Y F i W I; I O N (O n M n CO (0 N N v M N N (O 0) CO V n V N (O V n N (0 N_ n O (0 M (0 n M n O (0 (0 co co V n 0) O) 0) 0 CO CO CO O (O d CO V V V V M N .- O O 0) 0) O) O O O O O O O 0) U ii 0) O O O O O O co O co O 0) 0) O) co O O O O O O 0) c c co m co m co CO ao co co co N- n N- CO CO CO CO CO CO CO n t t c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c, 0 n n N- N- N- N- N- N- n mn N- N- n n n 0 N- ) N- n n m C w o rn rn rn rn rn rn rn rn rn rn rn rn rn rn rn rn rn rn rn rn rn Z - Z `• o 0 o U) (n U) vi U) o N o 0 0 N (ri ui 0 0 0 (n 0- c 0 C 6u m f. C 0 y I 0 0) N- 0) N- CO (0 (0 0 N- CO CO CO CO CO Cr CO (0 V 0 V O O .- O O OCO N a- 0) V CO O a- O O 0) (O CO 0 4f V C N w N o O O O O O O O N M M V V 6 co (0 (0 V V V V O m Z U ydj E LI o > 0 O 7 o U "O W 7 J 2 Z W 0 .: m C -0 G U m !I t. 2 V) O co O (0 Q'f O n O (O c0 (0 O V O (0 n (0 N (0 CL .J U a O M W (D V (132 ,1:18 (O 2 8 aO (O N O D) O N n 4) en 0 > O O O O O O N M M c' (h M (7 M M N N M P) v t 0 C� 5 CL o co y CCI Z 7 (0 C LL n O 0 0 0 0) 0) CO n CO CD (D (O CD CD CO CO CO CO 0 (0 co O m c0 co co n n n n n n N- n n n n n N N n n M g 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 M M M M M M M PM` M 0)M O M M M M M M Mn M M) 40£ U D C } g H 0 M0)0 0 0 0 0) CO(D N- CO CO(O CO ,CO CO(O (O COCD COCD COCD CO(O 10 - 0 O O O 0) 0) CO 0) 0 CO a) 0) o) CO 0) 0) 0) 0) 0) 0 0 0 0 Oi 0) Oi '0i Q) of of 0) d Di Di of of of of Di N 0 O O V V (0) 0)O n 0)) OO 0) 0) OV) (O0) 0) 0n) OO) F• N O N N- N CO CO CO 0 CO CO N- CO CO N CO N CO Cr (0 CO CO Oa m O (0 M (0 O n n N N Cr U) a- V V 0) CO 0 V 10 0 V ,- O O (0 0) N M (D O O O N O O V m O O oi 0) (O M (O N ' , .c V co co co O N M a- 0 CO CO CO V N N N N 0 CO - M .- M N N N N N Y N g m 4 ,I O (n 7 )^ 'O O 0) co V N- 0 V 0 n 0 N- N- CO CO V O Cr N (0 0 CO J O N 0 U O (0 O O CO (O (O CO (0 (O N CO O N CO a- N N V N O O O O O O O O O O O O O O O O O O O O O Q 0 M UO V 1 V .Cm oN �, � E m 1_ au Q O a O ] m 0 0 0 Z a a O O 0 0 O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 OOO a_ OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO OO £ O (n p - ) a 6 £ o: .- N CO v 0 (O n O O) O ,- N CO V 0 (O n CO 0) 0 0 4 0 . 0. t7 0C co O) o £ • d m 01 Z Z ZSN O O. CO0 Cl) U) o co N- N M V M N co n V C) co O O) n M n V O) CD C) 0 0 n CO CO 0 . y l... O) (O CDCD a— O) CO C) n CO l0 W 0 M O C)N CCO 0 CO V M V N M N ''.. 1. O O n co N C) M C) M C) M 6 V O C) M O or CD V N O 0 U C)M V N CD CD n n co O) 0) 0 NV I m ` Z 2 w ? e- 11I 0 O O co N u) V) O 0 Q N N 0 CD N- C) CD CD CD O) co .- CD N N N 0 O) CO C) N C) N- 0 O) O) N 0 0 0 0 a- 0 M — 0 V N 0 C) M N C) C) C) C) C) n V 0 n CO — O CD CO O O O O O O O —0 N — N — — ,- N .- .- N N M N N M N N V 0 I' m Q m C H H J O 0 g CO .m m a O O - ' I w y 2 (D M N N V N O C) O) M C) O) C) C) V 0 O C) C) M 0 C) N N n 0)- 0) Q N W COV V N O N n CN N C)) N CO 0 CO 0 N- N- O O COC) N O C C 3 N a- a- a- s- O Cr)) O M V V C) N O) n n O Cr) O CO O C) V V CO C) LO 0 e n n n n n n co C) M c1 U) N n C) .- n N C) M O C) M O n C) M 0 ? j Y V V V V V V V V C) C) N- O) C) 0 0 N N M V V C) CD CO n CO E C) Ol C) C) C) C) 66666 C) C) C) C) C) C) C) C) C) C) caw C) caw C) C) C) m mm . ct E 0 u) v v v v v v v v v v v v v v v v v v v v v v v v v c v C O Im, co C) C) to co C) co co co co co C) to (1 co C) co co co co C) to C) CO co to co Y Y 2 i M ONN CD N a O CD NONM V NO) 0 0DNNOCD a- 0 OM O OO COCD CD C) V s- CD M N V 0 CO O) CO CO 0) 0 N V CD 0) CD n N N- N N- N 01 C) 0) C) co CD n n n n 0 V C) N M V C) n C) O) O N M C) C) C) O) • N 1 0 .0 co 0) C) 0 C) O) O) C) C) 0 0 0 N N N N N N N CD M C c c n N- N- N- N- n n N- CO CO CO CO CO CO CO CO CD CD CO CO CO CO CO CO eD CO CO E iC o 0 0 o o o 0 0 d o o 0 o 0 0 0 o o o 0 0 0 0 0 0 d o �) m t CO rn m 0) 0 0 0) 0) 0 0) C) m 0) 0) 0) 0) 0) 0) 0 C) 0 0 0) 0 0) 0) 0 0) ixc Z S C• CO O (0 V V 112f, C) C) CDM O N C) M V N N N O N C) CDC) C) V O N M C) N M CO n n n N- CO C) CD 0) .- N 0 .- CO CD n O) M 0 0) a- n C) CD 0 n n C t d wM M M M M M M V O) O M O) V C) M co M O) N O n M O n N N O V () N M V C) C) C) C) n N CO O) O) O - — N M V ((�� m L m a p• 0 0 0 7 N �'' J F- 2 Z (n 0 CON CD C) o. N V CO N CD 0 V C)C) CO ) O) C) 0 N CO N- C) N_ 0 N V O) C) CO 0 CD 0 N- N CD CD O) M CO C) C) COM CD C) Q) u;) t[) (� CO (O 47; M O V 0D O) O N C'7 V C) C) C) O) 0 N (") V C) I — — — NN NNNI CO Z 1 Z N C_ LE 4 U) N N- a-N M CD —CD N V M C) O) n CO C) CD N- n N- n N- N- n yC) C) CD CD 0 V n a-0 N N N 0 V O O O O O O O O O 0) 'C) n CON co C) O V 6 M n C) 0) M C) O 7m co co co co CDM M M M DC NOLLON- O N C) N C) N V n C) V COO co M V CO ,-- CD s- N ) coC) C) 0) a- N N N N N M M CD M V V V V N N N c. N N c. c. N N N CD M Ci (!J M M M co- co- M co- co- M co- M co- co- SII 111 C)) CCC) OC)) 2 V Cn) N N nn 2 .8 D V .C) C) n C) CI C) (L01. NMVV VNO C) I 0) O) O) O) O) O) O) C) 0) O) C) C) C) 9.>.V 0) M 1,... N CD 0 V C) N CD O) 0 0 N 0) 0) 0) 0) 0) 0) O) O) ) 0) O) V O)-"0` V CD 0) V co C) M C) O N M V C) CD C. co 0) O N N N N%x) M CD ' 0 C)V V V V C) C) O E N N N N N N N N N N M M M M M Cif M M M 'M M M M M M M 01- 2 N CD0 0) V C) O C) N O C) N C) C) C) C) O) C) 0 OI N C) C) C) M O N 0 O N V N C) O) CD N- CD CD — C) CD M N- — — M CO 0) CD M O) 0 0 CD 0) 1V V O C) O) C) V N O) C) C) C) C) r: C) co C) n n n C) C) 0) O O — co o C) — co N 0) n co co n n n n n n n n n n n n n n co CO C) ... CD C) CC .- C E NO.3... 'I. a1 CO N a CD N CD M N CD N CD 0 N 0 N- NN N- C) 0 V N n CD n M O J N N N N N 0 M V M C) CD O) C7 C) .- C) O CD M N CO V N CO V V Qp O O O O O O O r C) N- C) OO .--, N01 M M ? C) C) C) )- h co O) U >. V .CO CO c ; E m -0 1 o a 1 r 0 -) o o o 1 1 o 2 m — — — z a_ a - - 0 0 0 0 o O o o O o 0 o O o 0 0 0 0 o O o o O O o 0 o I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 a O O O O O O O O O O O O u) O N O C) o C) O C) O N O N O 6 ', (n OO O O O O O O O O O O N C) n O N C1 N 0 N C) N 0 N C) n a — N M V C) CO n CO 0) 0 a- N N N N M CD M M V V V V C) C) C) C) o 0 C R 5. 0 . C7 C T rn m E °= d - - "m 2 • a. co c O o CO V 0) U) CO CO U1 U1 0 V CO 0) 0 0) U) N 0 I` M U) CO CO CO V CO N- CO . et CO V CO V N- M N 0 O l U) U) M N .- O CO N- U) CO O N- U) N O) N U CO Co U) '- co N N N N M M ? U) CO r` co 0) O) O N M M4 U) U) O I. 0 0 a U) CO N- CO 0) 0 N CO R U1 CO r CO 0) 0 M et U) CO N- CO 0) 0 5 01 N N N N N N N N N N M M M CO CO CO CO CO CO et V m 11111 RI NI E 0 m la 0 E.gZ 00 z z > 2' CO N , CO = = I Q NN r) a OCO rV ` NN OO) NOO NnOMV M M O R n Mt0 M CM Yr2 CD CDof of U N N N N N CO N CO CON O O O O O 00000 O C7 O O O 8 Q = I C) C) g p 1 r r O 0 p m ro rt — a 0 0 m K a7 Y _ _ {� N l0 U) CD CD N U) N U) U) N N n CO CO O N OO U) CO CO CO 0 CD U) N Q CO CO O N 0) O CO 0) 0) N- N 0) N CO O O) 0) N V' CO O 0)0) V) N O CO et co No) co O 0) O N- 0) N CO .- V 0) CO N- .- O 0) M n .- 4 V co OD M 'Tr 0 ' .- O 0) CD n r N N- O 0) O N M U) CO N- O) O N M V CO t` 0) O M O On OD Y 0) O O N CO V U) CO r` 0) 0 N M V U) N. CD 0) 0 N M U) CO m m E o C �• co n r N- n N- N- n n N- N- CO co CO co co co CO co CO 0) 0) 0) 0) O) 0) 0) E y � v v v v v v v a a v v v v v v v v v v v v v v v v v v 71) C W CO CO CO CO CO CO CD O CO CO O CO OO CO CO CO CO CO CO CO CO CO CO CO CO CO O Ti) Y F- aW CO N- n 0) 0) 0 0 U1 N CO U) 0) N- 0) N- CO U1 O) U) 0) C C U) 0 N- 0 CO 0) U1 N. N. N CO 0) N U) 0) 0 0) CO V N M co co co N 0 O CD .- N CO R V C U) U) U) CO CD CO N- O CO CO U) ? N O r V CO U) CI M U) CO n CO 0) O N M ? U) c0 r CD 0) O N M V 4 U) CO CO r co '', C) .a- cs, co CO M CO co co V Cr V C V ct V' U) U) U) U) U) U) U) U) U) U) U) Cp o C co co a) co co co co co co co co co CD co co co co co CO CO co co CO co co CO co t d-'' G1....O 00000 00000 O O O O O 00000 00000 a D ttOr �`t– N- r N- r n N- r n N- n N- n N- N- N- N. re- I- n N- r` I- n n r` Z 14? co a) a) a) a) 0) 0) 0) 0) 0) coo) 01 01 a) 0) 0) 0) 0) 0)a) a) 0) 0) 0) 0) 0) 0) re U) U) CO U) U) U) U) U) N U) U) U) CO U) U) U) U) U) U) U) U) U) U) U) U) U) U) m C m O C d C) A p C V m 7 O R CO 7 CO N V' CO 0 V N- V N- V N- N N. 0) O U) M V O C ` w • N. CO CO N O O C') ,- ,- CO n .- C0 O ? CO CO N. N CO O) M N. .- U) 0 O) r` c, U) U) U) U) U) co r- CD O) N 7 U) CO CO 0) N M U) CO CO 0) V ,, C) U m a U) r` CO 0) 0 N CO Cr U) N- CO 0) 0 N CO N CO N. CO 0) 0 M N ' a' T W .- . +C- s- N N N N N N N N N M M M co co co M M CO et ? V 7ire ,2 = OM pII p > 0 O 7 W w j J I- 2 Z co 0 t O N 0) 0) M CV UD) O 8- M n O 0'; O nM M O r) M CN M 00) M CUO) N CnD N CL N r CO M O ,,- N N .:co) v U) CO m N- CD 0) O O N N M M V R U) U) CO Ce N N N CO 0 CO 01 CO M CO M M CO CO CO V eh et 7 V V V V et 7 V 7 CL a') I rng m ? zz C6 1 C 1 LL O) N CO 0) N CO N r` CO U) N. N C CD 0) CO U) CO CO N CO ? 0) V CD 0 I 0) V n 0) e- 0 N- M N P. M U) n CO N V CO CO O CO U) CO 0 CO U) CO U) M n O CO n O M co m O a U) N 0) V CO m O M U) N.: 0) N V CO co • co co a) O co U) N- 01 tet V CO'.,, CO 0 :M U) h 0) N R CO CO 0 CO U) O- 0) CD U) U) U) U) CO O CO CD CO N- N N I. CQ CO CO CO CO 0) 0) 0) 0) 0 O 0 0 0 O N CO- M M M M M M M Ch co M co- co- :a co M M M C) C') C') C'i V V V V 0) N O 0 N M N n M) U)) Nr UN in Q0Q* M ACD O N N r 8 N C ` O '.. M CO 0) M OO O) N n 0) N R co C(i e` M ., N- .p N_ V CO O) CO U) CD ; CO O N U) N- 0) N V CO CO CO U) N E'1 N `4 CO 0) CO U) I� 0 NVCO '.. U) CO CO CO CO CO N- N- N. r- CO CO CO CO 0) 0).'e0) 0) 0) O O _ _ _O 0 I 0 , COM M M M M COM M M COCOM M M C? M M C) "V V cr cr et er er et N- CO 0) CO CO re- U) N. CO CO NM n M r M N CO U) r CO N CO V 0) CO co co OO co co O) CO _ M M U) 0) N O U) U) OD n CO L NCO M V V U) U) U) )6 U) )6 U) U) CO CO CO O CO CO r` r` n n n n N.: N S CO CO CO CD CO CD CD CO CO CO CO CO CO CD CD CD U) CD CD CD CD CO CD CO CO CO CO 7 1 E74 _ a, °- I a U) N N- O 0 M 0 CO CO CO M CD N O N- N N M CO ct 0 0) 0) N O N- M O) O et O O 0) U) CO N M N N M N CO CO N <- O 7. .- O N M Q O O N M 4 U) U) CD CD n N- n n n r r r r r r` N- n n n n NN NCNNNN NVINNN NNNNN NNNNN NNNNN g >. V E m c — < O d t L in m t12, O O O O i CO ZZ 0 a - - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O in O U) O U) O U) O U) O U) O U) O U) O U) O U) O U) O U) O U) O 1 h O N U) N O N U) re- O N U) N- O N U) N 0 N U1 N ON U) N- ONO CO O CO fO r r N CO CO CO CO 0) 0) 0) O) O O O O s- .- .- s- N N N ' Q ', o .0 0 �,i V 0 c .. a CO la p C T E °o. 1 hi - a Z N o m m o a• ` m33m v') • • N N- 0 CO N CO o (D (O (o co o U V IN N 0) 0 7 0 IN CO V 0) IN V LO N 0) N N 0 0 0 7 N CO CO V V UO CO CO O N V 0 CO IN N- CO 0 V a N O OO O O .- N CO V 6 c0 n c0 O) O N co U[) co I` O O) O N CO N CO V c0 N- CO 0) 0 N Co V N CO CO 0) 0 N co V u) CO CO 0) 0 J W 0 0 u 'Cr V V v V V v (n (n U) u) u) U) N an N CO CCD CD Co 0 CO CD (D CD N N 0) ,40.mi 0O y ' o Z Z 0 0 Co > > Q N N U) CO CO 0) 7 CO co .- O) N V 0) n N C0 N 0 V CO CO V CO CO c'7 V V Cl. V C() O) V V CO •"CO N CO 7 IN CO CO V N- 7 CO c0 CO CO N O CO CO N CO COO (00 U o o O O ,- ,- O O O O O O O O O O O O O o 0 0 .- o O 0 d d O) C 2 2 0 J O H H 0 G O N a d 0 O O 3 Y a N co O (0 O N c0 V V V N N O O Ni N CO O O N O N O 0) N r--- CO • Z Q V V N N O C0 N CO IN CO 0 CO C0 IN V CO N O) O CO N O CO N V n C 3 N N CO CO CO N CO N CD CO N- N- IN CO CO 0) 0 0 0 0) I- t0 L t 0 ' V 6 N O o M N n O N V CO DD 0 N V O O) 6 )O n CO O N Y CO 0) 0 CO V CO CO N- CO 0 7 N co V CD IN CO O) O N CO V c0 CO CO CO O.— j j E cc) OI... 01 0) 0 0 0 0 0 0 0 0 .- e .- .- .- .- ,- .- N N N N N N N N E 0tovvvvvvvvvv vvvvvvvvva v v v v c c Q d OO co OD OOOO (D OO woo OOOOO 06666 OO YYCo WF- W co ON ,-- CO CO c0 0) N c0 V c0 c0 CO N 0) 0) 0) V c0 c0 C0 U N CD N 0 r V 0 V 0 _ CO V c0 CO Cn N 0 N r 0) c0 0) V N- 0 CO V 0 c0 0) V 0) CO n V N 0 N V CD CO 0 N V CD CO 0 0 d O O O O O N N M fh C) V V V V V 6 6 N 6 N O O O (D co c) 4:i 0) c0 N CO CD (0 CO CD CD CD CO c0 c0 O CO (0 (0 CO (O (0 O CO (O CO cO CO CO CO C O C CO CO CO cO CO CO cO CO CO CO CO CO CO CD CO CO CO CO CO CO cO CO CO CO CO CO CO :EV O O O O O O O O O O O O O O O O O O o O O O O O O do- t co N- N r I` N r h N- r IN N N r N- r N- r N N n N- n n n N N N a . Z 7 O) 0) O) O) O O) O) O) 0) O) 0) 0) O 0) O) O) O) O) O) O) O O) O) 0) O) 0) 0) c0 cn c0 c0 N N K) N c0 c0 c0 c0 6 N 6 N N U) 6 6 6 N 6 c0 6 c0 6 «d C O c dO 'O u V i0 V2 0 i0 CD V 0 V 0 0 V V CO CO n V CO CO CO N 0) 0) CO N CO 0 c0 CO c0 co C C f.1 V CD N CO o CO CO 7 0 O) CO N. CO N c0 c0 c0 CO IN CO 0) 0) O) CO N- c0 CO Q0) d 0 w co N C') C0 CO CO 0) *- C7 O O COO N4 7 O N4 CD NO 0) 04 CD CO O O d (,) N V c0 W I` CO 0) N CC7 V LO co CO O 0 O CO V c0 O co 0) 0 N CO N U d w 0! T d V V V V V V co N N an an co C0 c0 co co co co O co co co r N n n n 0 >> 0 0 7 N W 0 co co N O 0) CO V CO CD LO CO IN CO CO N IN N 7 N 7 N- N N V V 0 CL CO 0 V CD 0 7 V CO CO 0) O O O O O 0 O) CO IN 0 0 CL C V V V V V V V V V V V V V V V V V V V V V V V V V V V O. a N cg mz z _ c m c �..L N CO O CCO O Wr N NcO IN N N N N O) Vr- O 0 V N O ,1--; V C(0 c(0 V I—CO CO N N r O N V O m O N V (O O p N O N n 0) O Cn r O) CO co N V CO CO COc0 N- O NCO., V C CO 0 ;C') c0 IN 0) V N- d CO CO CO 0 NO) _ N N N N N CO CO CO '0 V ."! V 4 a N 6 6 N co co (O co co O) co V ? a V V V 7 a V a 4 V 4 V V V V V V V V V V a a V a 7 03 `0) V U) N 0 CO 0 V N- O �I N V N- 00)) N CO V CO V V V V V UCO N < Q) c0 N- CD c0 c0 t0 c0 t0 Ci N V cO O N u7 r O _ C) N N- N Co c0 O N V (O CO O N I O O c0 N O N V CO CO CO c0 N- c N 4r (O CO 0 co c0 N- 0) V CO • N N N N CO CI 0 ch C V V V V V 0: 0c0 LO CO CD CO CO IN IN N I 0 • v v v v v v v v v v v v v v v v=,...:v v v :t V V V v V v v N V CO 0 0) 0) 0 V h CO N CO CO IN CO CO IN V CO c0 CO CO 0 CO an N- 0 N CO CD N O 0 7 N 0 N CO 0 N CO N. 0) 0) N CO CO 0) 0 CO n a0 O O c0 c0 a0 O O O O O O o O o 0 o O O o O O O O L O a0 O O [O [O O a0 O go' O aD a0 O O O O O a0 CD O O O O O O O 7 E a co 4 1 c0 c0 V O N CO 0 V 0 CO 0) CO IN CO c0 0 N- CO 0 7 CO 0 N V CO Q N 7 O O (0 N- 7 V V 0 V (0 (0 c0 co co CO O O CO N- IN 0 N N N N Q I IN: N- c. IN n n O CO CO Co OO CD CD 0) CD CO CD OO 00 U) O CD CO CO W CO U) N N N N N N N N N N N N N N N N N N N N N N N N N N N I 8 > u °_ N 03 C E m < O a r V O O O O 2 m 7 Z a a - - - 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 a c0 O N O Lei O N O N O cO o c0 o c0 o N O c0 O c0 O N O 6 0 cO cn I--- 0 N 0 N- 0 N 0 N- 0 N N N. 0 N CO r 0 N CO n 0 N 0 N- 0 N a N C7 CO CO CO V_ V_ V V 0 0 LO N CO CO CD CO N r IN N- CO CO CO CO O O Q F V V V V V V V V V V V V V V V V V V V V V , V V V V V C .. — m .NO.. 6d V O C T a . d O) d N E •O d 0 0 0N. 0 a 0 0 Cl) ___- 0 ✓ 0) 0) V 0 _ 0) p) CO 0 0 V CO O N. 0 0) N. CO CO 0 N CI l!) N 0 . N O) (D M O) CO N CO V O) Cn 0 CO N CO CO N 0 CO 0 N M a- 0) CO N. (D V V U) 0 0 n 0 0 0 0 O N N p) V N u) 0 I- 0 0) 0) O N7 13 N Ch V U) 0 N- CO 0) 0 CO V N CO IN CD 0) 0 N CO V U) 0 CD 0) 0 'Mil U U n r r n N- N IN n CO OO CO CO CO CO 0 CO CO 0) rn 0) 0) 0) CD CT) 0) 0 CO O O d cc ccy o Z 00 0 z z > ` (C) O)CO (n 7 7 a N N V r N 0) N- O r 0) V C7 N V 0) CO 0) CO V CD O C7 V CO CO N . O O1 d 0) O 0 V M O CO 0 D) O 0 N V V CO CO 0 CO a- CO M V N CD 0 0 0 CD CO 0 (J O C7 6 6 O O O O O O O — O O 6 0 6 0 0 O 6 6 6 6 0 0 Q a d d 7 I16 I O o g CO (C ,a2 d ,cc cc l6 W 0) 0 0 (D N (O CO CO 0 O CO N M O CO (O V 0 CO N O) N- O N O) CO C0 l0 N 0) O N. O CO O) C7 0 N (D V V 0 N V N 0 0) V 0 CO V N N 0 3 Q O 0 CO V CO N CO O CD N O) CD V N O 0 O O N N p) V CD CO C• C � � � .E t 0 ' V 0 n 0 N V 0 Co O) N V CO 0 O N V 0 0 O N V CO CO O N 0Y 0 N M N CO IN CO 0) 0 N CO V CO CO CO 0 0 .- N V V) 0 n CO 0 .- j j E CC) CO O CO O C) O CO Ch CO V V V V V V V V CO N CO CO 4) U) U) N CO CO ' CO CO E c N v 'Cr- v v v v v v v v v v v C V v v V V V V V V V v a a — �`T d .0 rG H 7 CO CO CO CO CO CO CO CO CO CO CO CO CO CO 0 CO CO CO 0 CO CO CO 0 CO (O (O CO Y Y H W W co co V N co O O co co N CO CO 0 (.1 V CO U) IN V 0 N- C) 0 .- r ISI N. CO 0) 0) CO IN V (O N CO CO CO V CO CO 0 0) CD 0) N V CO C) N N 0 0) I- CO co O I` co 0) V O) V o) V co N CO 0 V n .- V n O M co 0) G) 0 CO CO CO CO CO V V O O N N O O 0) 0) 0 N n 0 CO CO V O N O 0) 0 0 0 0 CO (O (O CO CO (O 0 CO U) CO CO (O CO O CO CO CCO CO CO CO CO (O V C 0C CO 0 0 0 0 0 CD 0 CO CO CO CD CO CO CO CO CO 0 CO 0 CO CO 0 CD 0 CO CO L .E �-' O o O O O O O O 666. 66 66666 66666 6666 d Z 7 to 0) 0) 0) N. 0) O) O) 0 0) 0 0) 0 O) O W 0 0 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) co CO CO CC) CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO co- CO d C d C d▪ d Q R c 'p C V m 7 0 0 O N. N CO O) CO CO 0 (O CO V 0 0 CO 0) CO O V 0 0 N C ` d w r- 0 co N 0) 0 CO O N. CO O 0 CO 4 O) CO 6 0 CO I` I` CO CO 0 O 6 N C) CO Io 0 O N V CO o 0) O N V CO N- O O CO o) 0) C) co 0 O p L..) N (O no) 0) O N O V CO CO 0) 0 •- N 0) V 0) 0) 0 0) 0 N 0 V N C o- t N a N. N I� 0 CO 0 CO CO CO CO0 CO O) 0) 0) 0) 0) 0) 0) 0) 0) 0 0 0 0 O O J F- 2 Z CO C 0 N V 0 CO at COes (^D N CO CO O V N. 0) CCN V 0 CU1 U1 OO 0 V N M V CCI OO U) CO (r0 N- a Ce IN N: CO CO Cn Cn M 6 N6 O O CO CO II CO CC) V C) N C7 CIO Ce V V V V V V V V VV V VV Cr (") CO CO O O O O O CO CO O N N N O. N W +K CO Z Z 3 C C it V 0 N N. V V IN 0) CD CO N V O 0 CO V V O a- 0 CO V CO 0) ✓ N CO IN CO 0) 0) 0 N O V CO CD CO CO CO CO V CO N 0 CO N- CO CO CC) N- 0) O CO N- O N V 0 0 O N V 0 0 O N V 0 0 O O CO N O CO 0 O N V n co r O CO 0 0 (N V 0 o) O CO N- O N V 0 0 a I- N I- N 0 0 CO 0 CO 0) 0) 0) (P 0 0 0 0 O a- a- s- a- N NNNN CO N V V V V V V V V V V V V V (O CO CO u- u- CO CO CO CO CO u- u- CO CO a O 3 2. ✓ 0 N r V V IN 0) CO CO N V O 0 O V V CO 0 CO V CD 0) CO N. _OD o) 0 N CO V CO (D N- CO CO '0 CO Imo. CO CO V CO N O o) N- CO ✓ (O CO O O CO r OIO CO r 0) O CO N. O) O CO I- o) N4 0 0 0 N CO h. 0) OCD 0 0 N V n 0) 0) CO CO N V 0 0) CO U) h 0 CO 0 0 0 0) 0) 0) 0) 0 0 0 00a- e- N N N N N O O O C V V V V V V V V V V (O CD CO (D (f) (O lD lD (r) (D (D co- co- co- co- co- In N • CO 0 IN 0 CO O 0) V O IN 0 CO O) N V 0 CO V CO CO 0 O) CO V O IN 0 a- O U) CO 0 O CO V CO 0 0 CO 0) 0) 0) N CO N O V V V CO N N N N N N M C) Ch C) C) U) C) C) C) O O V V V V V V V V V .0 0) O) O) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) O) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 7 a co 7.- a a Co O 0) IN 0 0 CO 0 V Cr CO 0 0 0 CO CO 0 n CO V O (O N CO N CO V J0 0) CO 0 CO 0 .- 0) IN N- CO CO 0) N CO V CO N. 0 0 0) 0 0) 0) a- N .- Q CIO IN ri N.: Na Co Co IN n N r N- C` Co a0 Co CU Co Co Co CO CD Co (0 0) o) O) NNN NNOIN N N N N N N N N CNINN NNNNN NNNN 8 U _ d• m C E 10 • o 0_ s t -0 ) 0 0 0 o 2 m s- g z a = o_ - , j) 0 0 0 O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 , 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a. o v) o U) 0 u) o u) o (n o v) o v) o (n o U) o u) o u) o cr) o ui o .13 CO IN 0 N CO N. 0 N CO n 0 N CO r 0 N U) IN 0 N CO N- 0 N (O n 0 Q 0) O) 0 O 0 O .- .- .- .- N N N N O O O O V V cr V (O 0 (O (O CO IN CJ C V V V u) (ri U1 ui LO- LC LO (n (n (n (n (n (n U (n (n (n U) (n 41 ui (n (n (ri N c CaC ..0d U O C T E _d d d ry 7 N U• D. (i) 0 (i) O) N n r N cos_ CD N 0 0 M u) 0) N- CO u) CO CO 0 V CO 0 n CO . u) CO n 0 O N 0 0) M 0 O u) 0 CD N 0) CO ? CO V •- N- CO co M M V u) 0 0 O O N V u) r 0 O M V (O 0 O M u) co pD O) i■� ,- N M V v) f0 0 O 0 N M V cD n 0 O M u) t0 r 0 O O U U O O O O O O O O CCD, N N N N N N N N M 0) ES 2 0 0 N w zz > " co 0 co 0 0 sK N Nu7 N- Cr u) CO N 0) M 0) CO U) 0 V V n CO u) O O CO 0) M N u) N co V n O h CD O N CO u) CD 0) CO V CO u) .- V CD u) N Cr CO u) (D CO (0co U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U 0 m m CU H H 0 0 m m m a £° c° ' N (0 (p 0 O N 0 0 M u) N O O O 0 0 O C'424 u) 0 t0 n V 7 M Z OO v) O O N cc's; V M v) O N N- r` M O 0 O 0 CD V 0 A (O O) O) Q co N COM V 0 N r- N OD V a- 0 CO Cr CO M M M N N 0 0) 0 CD V c- L L 0 ' V n O V 0 O V CD O N V rO M (O O N ui 0 [h 0 O N vi O 0 7 N M V CD N 00 O N M V 0 N- 0 0 N M u) 0 N- 0) 0 N V u) E u) CD CO CD CD CO CD CO N- n r- r` n r` r` 0 oo co co co Uo co co 0) 0) 0) 0) 0) - m m v v v v c c Cr- v v v v v v v v v v v v Cr- Cr- Cr- Sr- Cr- Cr- Cr- v • a. >. m E 2 y 0 v 44444 v v v v v 44444 44444 v v v v v v C W co 0 0 co CD CO CO 0 0 CD CD 0 c0 0 0 0 CO 0 0 0 0 CO CO 0 0 0 0 Y Y H Lu co CO 0 OO V co n M 0 0 co M O 0 c0 0 OO 0 V 0 u) V cO N M O Cr (D CO CO 0) CO 0_ CO VN _ CO V CD N- CO CD u) V N _ N _ 0) N CD O M r N 0 u) 0) CO u) 0) CO n N CD 0 CO 0 u) m N O O O O cO 0 N- CO CO 0 u) v M M N N O O O O 0 Op N- 0• '7 co u) u) u) u) V V V V V V 4 v v 4- 4 U) 4D Tr 4 co mos pep 0 co ,M C o C OD 0 co co co co co co co 0 co 0 m L t cg O O O O O O O O O O O O o O O O O O c0O O O O o O O O 2 Z U) r• N- r- r- n r- r- n n r- n r- N- N- n n n r- n r- r- n n N- r- N- N 1.1 rn 0) 0) co o) co o) 0) o) rn rn O co co rn rn 0 rn 0 0 0 0) 0) co rn 0 0) U) 6 6 6 6 6 N U) U) U) U) vi 6 U) 6 6 6 6 U) U) 6 6 ui U) ui U) m C y c C Gi V is 'O C Vy O CD u) OD 0 N. CO M vCON- COCON- COc ) N COCO 0 0) 0 COOO v) CO 0 CO0 Ef: O7 V n 0 0 N CO a- WNW V a- 0) 0 CD CO CD U) c0 V NINO 0 0 M Ow d 0 ONO O0) 0 m M Zr, v0) (00 0 0) O O M V U) n Oeo 00) O N (e+) V (-0- n 000 00) N O m• Q' O O _ N N N N N N N N CO CO CO M CO M M M V u O G O o (a 0- .- 2 Z 0 U O u) N- a V' N 7 CO 0) c0 0 C co V N U) 0 'Cr CO N OD V1"... CO 0 N N St CO CO O N M c0 (O CO O CO r0 h O Cr (O CO CO CO CO Cl) N N N N N. N N N N N 0 0 r r` 0 u) V M N N O O O 0 N- 0 CC a- CL a rn5 m Z z s z m C_ N pr� LL 00) n v O m v V � •0() O) ; a O CO 00)rn 8 (nD O r0) n V 3 00) a Op 3 000 O O N V c0 r O N v N r- O O M V 0 rco O N V u) r` 0 0 O M M ` O To: VM COV 0St 0 N 0 0) CO" M 0 (r`O 0O N- V r're. P. O ONO OV 09 0 N - tri uv6 n n n vn ui u) U) 00 ui ui co rn nN- ui u) ui ri ori U 4:3 40 V ' 0 CO N OO) CO OV') 0)) 3 r' CO N 3 0 3 CO N'X -";3- ) ' CO O (7, O 0 O M v0 0 O M u0 0 O N av ' N O 0 N M N 0 0 n ONVa00 322n0) c0MU) UN N-NN-Vn 40OO MuON- OOO) M 0E vvuu ) v) vi v1 vi vi vi vi u) vi u) u) 6Y u) u) va 47) vi u1 ui vi vi vi u) m N- OO M N V r c0 0 CO N v) u) V O M N N 0 u) u) O 0 u) r 0 O 0 OO CD CD N- N CO 0) 0 N N CO N- CDWNICOCO CO V M N V Cr ' L V V M M OM M M M M M M M M M Si M M M M M M M M M M M M 0) 7 • _ I a 2 '- O .N Y Q 40 O O N- u) CO 0 N. O CO n u) N CO V CO 0) 0 O Cr I,- 0 0) CO CO 0 CO LOW 0 0 N- COO a- M M u) N 0) 0 COCOCONO 0 0 0) 0 CD CD Q O o O1 0 0 0 0 O O O O O O O O O O O <Q N NNNNN N M M M M M M M M M M M M M M M M M M M M • N O 4D 0 c Q 0 N d t 0 0 CO O i m Z O d =3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Ci- 6 u) O u) O v) O u) 0 u) O u) 0 u) 0 u) 0 u) 0 u) 0 u) 0 u) O u) O u) Cn N u) N- 0 N u) N- 0 N u) N- 0 N u) N- 0 N u) N- 0 N u) N- 0 N u) N... CI co co co r r N- n CO CO CO CO 0) 0) 0 O 0 0 0 0 .- .- a- .- N N N N ID 0 cgn ui ui ui vi ui ui ui vi ui ui ui ui ui ui (o (o (o (o (o ro co ro (o (o CO (o c c ., m c u) C4IE a m aaa) . a) E •o : m .NZm o IN O O. O33 o u) 15 • • U) 0) N h CD 0) 0) N- N N 0 N a N CD a CO CO CO a a N U) CO M 0 CO CO . ^^ co N 0- a- 0 CO .- a N. Cr) a- N N N a- 0 CO CO a a- CO LO .- N. CI CO N D `.ami� N a N N- UO O N C') a O n UO 0) 0 N C) a s N (O CO N- C` a0 E U U N C) a CO CD n 0) 0 N CO a CO CO CO 0) 0 N C) a CO CO N. CO 0) 0 C) CO C) C) C0 CI C) a a a a at a a a a CO N N CO CO CO LO CO 0 U CO m = 0 0 rn a 00 Z Z U) co ) N 6 7 7 Q O N CO CO CO 01 a0 0 0) UD CO C) CO CO LO N 0 a UO 0 0) C) CO CO a CO CO a N N C) co co N N a CO .- a CD a CO n UO a CO a UO Cf) a CO CO CO CO CO O 0 m 0.. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W- 0 Q • do H H O 0 o m• m a O O as a' y . co CO O n 0 CI N co N N CO CO N CO N 0 a CO C. 0 r CO N OD CD) CD) Q O N r C) a 0) N. CO 0 0 O a N N CO a N- a CO 0 CO CO N a n C C 3 CO 0 a- CO a 0) a CD a CD a- a CO h U` n CO 0 C) UD CO N CO a 0) 01 L 0 ' C- O C) CO CD O C) V) OD O C) u C- O) C) CC) N- 0) ` N a CO N- O) O Ni O 7 7 Y O CO O) 0 C') a CO CO UD 0) 0 ! N a CO CD N- CD 0 N C') a CO n CO E U) Cn 0 0) O 0 0 0 0 0 0 0 0 a- .- .- a- 1- a- N N N N N N N N - CO CO E C a a V to- CO Lo- Cn Cn to- N N ui C(i CCi CCS C(i U) U) U) Cn CO U) CO U) U) CO U) >, �., N ,E •. 7 a a a a a a a a a a a a a a a a a a s a a a a a a a s C lL co CO co co O CO CO O CO O CO CD CO CD O O CD CO CD CO CO CD CD CD CD CO CD 5 Y Y H 2 LI CO CO N- a CO 0 N N_ _ _ a0) a a 0) _ NCO a C') N- N N N. N N- N- CO N CO N C. UO CO N- UO 0) 0) 0 0 N- COUD C) 0 0 0 COUDN N O CO O CO 0 CO CO CO N- N CO CO N CD CD N 0) N- CO C) 0) CD CO U) r CO CO CO N a a C') C) N N O O O 0) 0) 0) c0 W CD O 00 n n a .0 C) CO C') C) CO C) C') CO CO C') C) CO C') C') C') C') CO N N N N N N N N N N N CD C UO CD UD UD CD CD CD UO CD O UD UO UO OD CD CD UO m UD CD CD CD CD CD UO UO CO a C�" O O O O O O O 6 O 66666 66666 66666 666 N 0, N- m CD N. 03 N- N- 00)) CD N. ) 00)) O^) 0)) Ori 0)) 0)) 0)) O0) CD N. CD 0)) 0)) 0)) 0) ✓ Z CO '° CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO Lc; CO CO CO CO IO CO CO U) 0 R N V C U' c N UCU C 7 CO 0) co CO N- O) 0) CO 0 CO C) 0 N. CO CO CO CO CO a CO 0) C') M 0 a O C U U 0 O C' O) O_ 0 CO 0 CO CO N O CD N- CO N CO O CO CO O N OD a m C) N r-- O N O D 0 CCO O N N O D O N a O D O 0) 0 O N O)O w wN U U N h n CO ` CD 0 N CO CO CO N- CO 0) oN C) CD D CO CO 0) 0 rN U w CD a a a a aaD CD CD CD CD CD n CD LO cCO CO CD CD CO CO CO n N. r- el - CeNa CO F• rL 2 N ❑ W �' J o N- N 0) CD N 0) CO N N 0 CO CO n N CO UO N a N CO CO CO CD CO CO CL ,- C) CD CD a CD 0) N CO N O) 0 a- N- C) CO C') 0) a 0) CO N. a- CO O) C') m CO CO a M M N 7 O O O N C') ``,5 CO O r N- UO CD CD 0) rt CL N os m Z 2 2 7 cn c6 C it CO C') 0) a N CO 0) CO N N CO N CO N N CD a C) N N- CO UD N CO N. 0 CO 0) a 0 CD N CO U) N 0) CD a N s- 0 0) 0) 0) 0) 0 0 a- N a CO r 0 O .- C) CO O O 0) C) 4 CD CO O N a CO N- O) a CO W O Ni a O O) cnO 0) '- CO CO n 0) a CO 00 0 N CO n 0) CI N CO 0 N a n 0) M CO co CO O) co 0) O) O O O 0 .- a- a- a- a- N N N N M M C) CO C) a a a CAN to CO CO CO CO N CO CO CO CD CD O CO CO CO- CO CO CO CO CO CO CO CO CD CO CO CD CO ❑ N UD M 0) a N CO 0) CO N N N N N 01 NCO r(0 a p') N r CO CO N CO N 0 N s- CO N CO a 0 n aa- CO CD a el N ,- ,'rt^ '.^ N N C) a CD 0- 0) N O) N CO a N- 0) N 4 CO N-O 0) O CO ( 0) e+ C) O) C) CO UD CO CD 0 N a CD UD C) CO n O) a C{CUC)p) UD 03 N CO r 0) C) CD CO 0 N 0) 0) 0 0 0 0 0 N N CV Cab -C•1 C) 01 (') C) V a N N ❑G - vI Cn m CD m m m CD CD CD CD CD Co co CD co, m CO CD ,CO m CD Co CO CO CO CO- F W V' a CO N 0 CO N CO Sr 0 ea CD CO 0 0) CO CO C) CO 0 a 0) N- 01 C) a C) N a C) C) a a C) N 0 CO n CO a CO N _7 a N 0 CO 0) 0) N M CO C) C) C) C) C) C) C) C) C) C) C) N N N N N N N N N N N .0 0) 0) 0) co O) 0) O) co O) O) 0) 0) 0) O) 0) 0) 0) 0) O) 0) co 0) O) 0) 0) 0) O) 7 E N ° a m .N 1 a m CO a O) CO CO N. 0 CO a N- a CO N- 0) CO N 0 CD N. C) N N. 0 C) CD 0 J CO C) a aa- O 0 0) CO CO CD N 0 CO r CO a01 <- 0 0 CO n CD CO C) a- Q O O O O O O O O) 0) O) O) O) O) UD UD 6 UD UD UD UD CD C- C-Cn C- C- n C) C) C) C) C) C) C) N N NNNNN NNNNN NNNNN N N N ' CU CO C N a O a t L CO CO "CV -' O O O O E m z a a - - - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q_ O CO 0 CO O CO O CO O CO O CO O CO O N O CO O CO O U) O CC) O N O CINUIN O N N N O N CO C- O N U3N- ONO N O N CO N O N UI Q C) C) el CO V V V V 0 CO CO U) CO CO CD CO N C� N- N CO CO CO UO 0) 0) 0) O .0 ❑ C CD CO CO O CO CO CO CO CD CO CO co Co CO CO CO CD CO CO Co CO CO CO CO CO CO CD V Ul 0 C O.U d .. CD O 0 E o :3 m m 'y D. a CO 0 Cl) CO 0 0) 0) V N- N CO N a CO U) CO N 0 N 0 0) 0 n N 0) 0 (0 ® m CO O L- N L- 0) M V N m N m L- V V ,- V U V V M N O) n CO CO U '_'�lie m m O) 0) D) 0) m m i,;--, m V N O m U) N O) l() n M O) (A O m N n W U U O C 0 X, CO CO m 0 m O N N. N N. N N. N N IN N N N N O O CO C O co N co co co co co co N.0 n n N. n n n n n r- r- CO_0 0 m m CO 1 5 d a a N 00 > co " (p0 Cl) = = h _ N O a CO m O m N CO m CO 0 CO m (() N- CO N O CO .- CO U) CO 0) U) CO N N N N O) CO m 0) O 0 N 0 N e- 0 m R 03 O) m CO V. N m n n m m 0) CO O O a O O O O O r N M4 M M M M N N N M M .- O O O O O O O O 0 CD CO 0 z U @) a) a g,� I 0 7 Q J O I I- r 0 0 _g Z Z a _ I 0 0 3 co a a (6 M V M m N V IN m CO n NN n O CO (n N CO O O) CO CO O. 0 m 0 O m 01 M CO N CO n O m m N N 0 O m Cn N O 0 0 M CO n O) m 7 CO CM Q N- 0 N a a M L- 0 CO M m n CO n CO CO L- L- O CO M 0) a CO N 0 m .E t U ' (i (n6 n 6 0) O O O O O m n U) M 0) m (-Ni O) m N O N N m4 Y 0) O N M C m n CO 0) O) 0 N M a a U) m m N CO CO 0) 0 0 OL- j j E In C N CO CO M CO M M M M M M O. O' V O- N N 0 m m 0vvvvvvvvvvvvvvvvvvavvaav= o .E2 v v v Wm (O m m m m m m m m m m m m m m m m m m m m m m CO CO m TU 13 Y F- 2 W N O m m CO Lr:' M n M m M CO M N O 2 0 m CO) O) O )n 0 n CN nO M O n M 0 n V 0 CO N CO .1. 0 m N n M 0) R 0 m CO 0 (n O m Y) n N m m m (C (C U) V 4 M M C) N N O O O O O) DD co m n n V V C) N N N N N N N N N N N N N N N N N N N N C 0 C GD co co co co co co CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO m CO CO y t =' O O O O O O O 66660 66666 66666 66666 Z 7 CO N N CO On) CO N N W W COnN W COnCOnN. W CO CO N N W N CO 01 CO CO Ce N to Uf) to to U) N N N L V) )[) N )0 )O )0 to N ( N N iC N N N l() V) C d S.C 26 U _W y C 0 7O W0 V C) N 0 CO N CO 0 N U 0 CO CO m m U) 0 CO 0 l0 CO cr 0 0 C) n CO N CO CO M 0 V N N )C LO N CO n a 0) O n V L- CO N m 0 M m 9 i m (0 d s m 0 g .,;,3 m n n n r,,,,-: m U •,._iN O m U N 0 O M O) m N O) U N O CO N M to m m O) O) O N M 1,34 V lO 0) m n d a' T R z n n n CO CO CO CO CO CO CO CO CO CO CO O) 0) 0) 0) m 0) 0) 0) 0) 0) 0) 8R0 ogi oIIU) co Y.. 0) N m M 0) `p 0) v O p Z...4- N O (O0 (n 0 m (n m O N O OM N M n m m 0 u) O) O O *r' N M l'') v v N 0 m N IN m m 0) CO O N N M M v % i 1 141 / 1 i i i i N N N N N N N N C111 L (n m Z z o z To c it m m O m 0) n (A k 3 m Y! n m m N O_ m_ V M n N C) n n N �f) O N m n M M fit) m M m U) N N M N n m O N p (o u) Uo o M u) ao �r o v n Le, 0) m 6 u) 0) r) nzirCO o I m O N V n 0) M CO o O M' ii N 0 N V n 0) N V m O) o m o 4) v 0 0 n u) (O m co (0 N n n ti m m m m m 0) 0) 0) rn o 0 0 o p co ig 0 Z — 1 m m O m O) n (n U) M m m n N m a V N M V 1::: N O) n n 7 n V m M 0) m (O N n O U) '}J n; M CO n 0) O N O N iC n O) N C n O M m O M n V NJ O Tim N m _ u7 O) 0 n 0) M CO a0 O M N N O N O) ? (0 O) M m m M lO N N N CO m CO CO N N NN m CO mm 00li:0) 0) a,—al O 0 0 O E co- CO CO m CO m m CO CO CO CO CO (0 m CO CO CO CO (0 n n n n N N: N O O O) n CO IN m t0 CO CO U) a M 0 CO V a N- CO O 0 N 0 N M m .0 NO)u) N)m Ndm) Nm NO Nm ONO MM OMm M0U) M(0 M VO M0) r 10 V 143. Vm Vm gel VN n Vm yn U)M um 0) O) E a g E . co •N Q 0 N 0) n m 0 0 N m (n m 0 O N ? N N 0 ? M 0) N m m 0 I.. 0 N U) CO N N N N CO N CO O N (n m CO 0) m (C V' N 0 O n 0 LO Q nN m m m m (fN) ((N) N U) N N O OOm n m UVUO Uui V V ? V U T U CD m C V O Q o a s o0 2 m O o 0 2 m z a a - - - 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O o 0 0 0 o O O O O O O O O O O O O O O O O O o 0 0 0 o O O O O O 0 0 0 0 0 a N- 0 O N. 0 N O N 0 N O 0 (n O N 0 N O u-i 0 N O N 0 N (q N- 0 N 0 N. 0 N i0 N N0 N N N 0 N N N 0 N N N 0 N N N 0 N n Q O O O O O N N N N CO M M M R V N N N CO CO 0 m n NNNn n n N-7 n Nn n n n n n N n N N n n n n n n NC .. 6 2 LO 0 a V _ ' O) d N E •o d 0 0 0 c •n (0) aco330 co Z. CD O co r 0) M CO CO cr n M 0) CD N CO 0) O Cr M M co CO . Cr O v) O v) O )- V CO N v) O M CO O V' N- CO N CO V N) N CO a- CO D M O V Qui O N r- N UD M CO a O .0 O_ v) O NO O O O O All W U U '6 6 ', v m ao co rn 0 0 ._ co co co co co co co co co co co oo co co CO 0 0 — 0 0 CO 0 0 0 0 0 0 m = O O m 0 z z > N V 0 0 0 0 N N N O O N M cc) 00 O CO0CO N CO V CO sr co .- co O COMco N n M CO N CD O COO COD V O O O O O O O O O O O O O O O O O s- O O O N N .- O 0 V d d p r r 0 o 0 2 m a d a O O J co W a m c6 O r LO 01 N O v) N O CO CO O r M O N O O CO O O O CO CO 01Q O M O O O Cr O U) O N Cl N. CD OD O O N. O n CO M O CO Cr O CO C C 3 CO v) r- O N V' o CO O 0 O N CO 0 N O N CO V' v) v) 0 0 v) CO O UD L L 0 . n6 O) 6N O V' O UD C) O u) n a O O N Uo a O o N Uo V' O 0 u) 3 Y N N CO CO V N v) CO N. N CO CO O O O N N CO M a v) u) CO O N- n E v) 01^ v) v) v) v) v) v) v) v) v) N v) co N c0 c0 v) c0 c0 c0 c0 c0 cD c0 c0 c0 cow co a) D ac IK co- )6 co- co- )6 vi vi ui vi vi co- co- co ID v) ID co co co- ID u) ID co- co u) u) U) �, �, d E •y 7 d' a a a V' V' v V' V' V' V• V' v v v v v v v v v v v v v v v C Lu O O O N f0 c0 O O o O COCCI CO O (O O O UD O O CO cD O f0 t0 O O gY Y H i W V O N O N. 7 CO 0) C. Cr O CO O v) CO CO CO O CO O M C- V' o O N. N-- CO r' CO cr CO 0) O) V' O N- co a co CO O N 10 0) M C) 0) a V' O n N N- N CO O V' n O M 10 N. CO O N N N CO M 0) O CO O d O O v) If) a 4 co M N O O O r` N- c0 v) V M N D r O Uco V 0 .� OI 000 00000 00 O O O MO c o C OD UD UD UD m m UD Uo Uo UO OD O c0 O UO CO UO O UO UD UO O UO N- N- NI`, t L C 6 O O O O 66666 666. 66 O O O O O 66666 66 N n r n r` n N- r r r` r N- r r` N- n n r r` r` r` r` r r n n n n ix Z =, O 0) O O O O O O O O O O O O O O O O ma) O O O O O O O 1f) u1 IO co v) v) 1[1 ui U) 01 10 N U) co- co co- t0 lO lD N co N IO IO If) Si C O C d N° U) o d C V u) N 0) O N CD CO Cl- v) N- O v) CO CO CO N N. CO V' CO N. M O N CO 'O 2 V _V O 0 N V' CD 0) CO V 10 CO CO 0) M v) r` CO O O O O O O CO of d w R N V O c0 N OO V) N- M O u) CO7 O O N O u) c0 N O4 O ca o . 0 d 0 N N. COCOO O O N N CO CO Cr N v) CO r n UD OD O O O a- a- N co co 0 � d Et >. d a) am 0) 0 O O O 0 o 0 0 0 0 O o 0 O O O O t d d70 re v- N N N N N N N N N N N N N N N N N N N N N N N 8 i0 O 7 R f,J 12 Z 0) O 0 � UD CO CO N. OO N, N- ON. N N O CO CO N cO CO O CO N u) CO O N- 0. 0. CO V' 0 CO 'Of CO LO c*) O ' coc0 COo 0 COCOM COCOCrv) 0 O CO N- CO Q) v v) co O rn. f` co O N M v cc) co r OD O6 N M v) co co a) CC N N N N N N c'' P)N c?..q M M M M M M M M M vt 'T "f 'T 'T O. a me CO Z z g C Ts c �..L N UD UD O O O N 0 CO 'C) V 0 0 U) v) c0 UD 0 U) O) O N U V c0 UD O M v) r O .- co fp UD O N V' cO UD O N In r` O N V' N- O co 4 O N n vi O M O N co O c0 co M I,: . to O V m M r O cc) O V d a- M O UD Mc0 Uo O M v) Uo O N U) n O N cO O V N- N r` NV. N N N N M CO M CO . Cr V' V v) v) v) v) v) CO cD CO CO N- N O) 0.3 0 W n r` r` n N- N N P n A:; ¢w.^"n r: n r` n r: n f` r- n N- n a r-O D O O O O ON 1,0 CO O O) A ,.: O 4 :JU}' n O N V) O O N- v M n N 0 O V UD M N- cO O V m "'co -. 1c) d)`,C) r� N c0 O V O co UD O CO v) CO O N LO N- O N v) N- O N V' O ' 'SF CD O VCO UD N N N N M CO CO M V: V: Cr Cr Cr 1.173.0v) O Q CD CO r r r r UO jl . E. r r r` rr N r rrr` r` n n r` n n r` r J. r` n r- rn n r 2 O O 0 V O O V CO CO Cr CO CO O O_ N- CO N- M v) O a- N O CO 0 V cr N CO N O V' V' CO N a N. N O CO O N N CO CO UD N N vi v) ui ui vi ui co ro r- r- n cd Ud m o) o) o) o) o ai oCi Ci v ui Z o) O o) O o) a) O o) o) o) 0 0 0 0 0 0) O O o a) o 0 0 0 0 0 0 E a .a, _ m •N a O v) O V Cr N- N- N N CO N LO cO O J V Cr e} 7 Vv) C M N N M CO R vv3 vvM M Mc" M O VO N N N-) 8 � d m C Em Q o a r D 0 0 0 0 2 D a — z a -) pop 0 o O o 0 0 0 O o 0 0 0 0 0 0 0 0 0 0 0 0 0 o0, Z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a O v) O co O v) O co O ui O vi O vi O v) O v) O u) O vi O u) O vi O cn N n O N v) N- O N v) r O N v) N. O N v) r O N cO N- O N v) N- O a 0 CO N N. N n CO CO CO CO 0) 0) 0) O 0 0 0 0 .- a- .- a- N N N N M CD G n N- N- N- r` N- N- N N- N- r- N r N CO- UO OD CO- CO- CO- OD CO- CO- OD O CO- CO- Cr 5. 4:":41 c a Vo C d Jo m 5E0 -17) .11 2 O 0 . (0 3 3a M V N V 0 V U) N 0 n 0 0 N- 0 n O) n U) 0 0 V N- 0 U) IPM L0 O cr 0) M n 0 CO N 0 n O N CO M N s- 0) m M CO x- r O '.. 13 W u) 0 R m C) n N6 O 47 0) C) m N6 O ? m 6O) N6 0) N �. U U Q)m n n n CO CO 0) 0) 0 0 0 N N C) C) C) V V V U) U) U) m j 5 CO 0) 0) CO 0) 0) 0) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CO ‘11 0 5 U O /= 00Ce CL U)> en 7 z z UC) 0 0 CC N N n 0 CO M CO VN 0 N CO 0 Cr CO CO V N m V0 m 0) Cl. x- N Z U) 0) M N 0) x- C) Cl. M Cl. V CO CO CO N .- m 0 CO 0 n 0 NJ N- CO O COO (00 U N ,- O O O O O O O O O O O r O O NON C) N6 0 0) 0) Q a J 0 12 r 0 0 O Ig m a O O co a' rx 3 (p CO U) 0) n 0 m V CO N CO n tO 0) U) n m CO N U) V01 m O) O) Q 0 V 0) CO 0) CO V CO 0 0) U) 0) m U) V 0) N N V C) 0 IN M C C 7 m U) .- CO .- CO U) 0 CO n 0 M 0 m CD n CO V n x- N CO L L 0 U) CO N N C') m V O) N O U) m m m m U) O V co 0 N W m 0) O) O O N N CO V V U) U) m m n n m CO 0) 0) 0 0 0 m m °f— CO co co n n n n n n n n N- n n n n n n n n n n m m m _ �, �, o f co 0 v v v v v v v v a a a v v v v v v v v v v v v v v 71) � 1C co co co co m m m m co co co CO m m CO m CO m CO m m CO CO CO m .7l) Y H W U) m m n C) 3 V m 0 CO N n CO m CO m n n V V CO N U0 N 0) N7 C) N U) �0 0) CO m _ V U0 U0 CO n U0 CO m CO C) m C) CO CO N- 0 CO N- 0 V n Cr n 0 C) m 0) C) V CO CO 0 0) 7) C) 0 m n N C) N O m nU) M N O m m U) C) O n m V V C) 0) 0) 0) CO CO m CO CO m n n N- n N- n m m m m m U) U) U) U) 0 C 0I- n n n n n n n n N- n N- N. n N. r N- n n n n n n IN N. m r k cg 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O p- c! m y o ff n n n n N- n n n n n N- n n n N- n n n n n n n n n N 0) 0) 0 rn 0 0 O) O) 0) 0) 0) a) a) m rn rn rn rn rn rn rn rn rn m) rn K Z 6 vi m u) u) u) m v) m 6- ori in Ui Ui m U) Ui 6- U) U) U) U) U) 6 6- C O C C V0 N 'p d 7 nm CO C) Cm O Nn m6 U0V n n) N Cr.; V V CV O) O n CO nn O C i; mw 'es IN: N m C 0) V O UO m 7i m N n N n N n N m uU) OCO w 0 ( m V Cr CO U) CO m n CO m 0) 0) 0 0 N N C) V V UUm U 04: aW c- ,- NN NNNNN '.. NINNININ NN M p Z m N N N N N N N N N Ni- N N N N N N N N N N N N N N N T.O . 0 O 7 �00 W 7 J I S Z N O O 0 L n m m M n m O O m (g.? n Cv m N 0 O N U) m C) 0. O N N 1m 00) CU0 co O N CUn 0) M Un m O N U N (O T (O m m r ); n r r n m 00 OD m 00 9' 9' CL N N CO ? Z 2. m co f0 On) NQQ C_ If it C) CO Om) N (UO 0-) C) (O 6 M r N N 0)) 2 N- (4 COO m (003 N 000 C') N m N IN. U) O V m C) N N m O U) O) C) m N nm O U) O) V ^ m O) V m m) C) co C1 co co-;-0 C) U) m 0 (') U) m 0 N N n n m m m m 0) 0) O) 0) 009 O N N N N C) M CO C) 0) CO40 n n N-- n- n n co- co- Ear f co- co- co co- m m m CO- m m CO- a 3. II rr'. ✓ n N V m O) C) n co n V 'N N 40 0 gQ C) 0) m 0) V 0 N- OD s- U) m x- V co .- U) co N U) m) tC) N- U)),..o, %,.,V m C) co V O U) n N6 O U) 0) C) m N m U) W Q6 C') c0 U) O) V 0 C) a co co a U) co O co U) COON LO =N O U) NONV n 0) N CO m m 0) 0) COO) 0) 0 0 0 0 N'N N N `C') CO CO CO CO V • En n n n n n n ) co- 00 00 co co co co C m m CD co m m m m co 0 U) U) n CO 0) CO V U) V CO 0) n 0 V V n n U) CO N C) CO V CO n 0) N CO 0 0 NU) CO m 0 CO N U) n N U) CO CO n CO U L 222 n nO n n m 20A m 0 0 m O O O O N N O N U) m a r 7 r r r .- r r E a - co •N G co U) C) U) C) O co 0) m m 0) n IN N 0 CO V m 0) N C) V n U) 0) J co 0) N V V I- x- N 0 0) 0) 0) n VVI C) N CO CO V n m 0 JC) N C) C) C) C) C) C) C) C) N N N N N N N N .- .- .- r- O O O 3 m u N m c Y... E ig Q o a r a 0 0 0 O 2 co z a a - > 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0- ..0 O U) O U) O U) O U) O U) O U) O U) O U) O U) O U) O U) O U) h N U) n O N U) IN 0 N U) n 0 N U) n 0 N U) N- 0 N U) IN 0 N Q CO CO CO Cl. Cr V V U) U) U) U) CD CD CD m n n n IN CO CO m CO 0) 0) 0 0 ao ao co ao ao ao ao ao ao ao m m m m m m m m ao ao co ao m m a et c .. — FII co 0 S. E m o E ^ m — — 'w LN. O O.• o0 3 o co M 6 • 0 _ _ co M co co V N N- CO N OD U) (O 0) N V 0) N V N M CO N. OD co O 0) v v N N s- O CO n CO n N 0) O OD s- 0) M U I.� — O CO n n n(D O O N 6M n 0) O O 0) n O 7 U) (O M O '] co CO 0) 0) 0 0 0 .- ,- 0 0 0 0 co CO n CO U) 0 0 O 0 0 O O O O O .- e- e. O O O O O c0 Lii U U N c N N N N N N N N N N N N N N N N N N N N N N N 0 0 1 0 0 Z Z co 0 N N V) 3 3 ¢ N N M N V V V M K 0 V N N- u) N U) 0 0 MCO N- n 0) 0) a O MO n CO 0 O MCI N OO O N U) N N V .- M ON- v O (p co U ,_ O) O) O 0) N N 4 N O 6 n M N 4 O N N M U 0 Q d d a a 0 Vo H H 0 O o Z Z W OO i d a O ? W - l0 co O 0) O O 6i0 M O N 01 0 0 CCD 0 M N n OO 0) CO OD Z M CO M O O V co N U) M N OO M cO O n O .- N 0 Q 0) N O O .- M N V' cO OD s- U) N N s- n N n OO N L L 0 . N u) O V OD M N- O N N O (O N U) n O 0 On O) M V 4 Y N N N M M R V V V M M N 0) cO t0 U) M o• = m E u) c eo m CO 00 00 CO CO CO CO OD 03 m CO OD CO CO n n n n n n - m[T d . •y in v v v c v a v v v v v v c v c v v V a a a v C IL a O co co co co OO coo OD o (O OO OO OO O CO CO O OD OD OD CO Y Y i- W I co co OD N 0 N N OD LO N CO CO 0) 0 OD U) M 0) CO R OO 0 co O 0) _ N M6 Of CO 0) n O) NMN CO M CO N 0) O n 0) 0) V CO 0) O 0 0) 0 MUD O M N 0 ' C) 0) 6 n 0) 6 0) n O O O O N n n N n M O O N O .0 0) V 7 V V .) O co co N- CO 0) 0 N M a U) N- O 0 N v Cd o c n r r` n n n n N- n CO O O CO CO CO CO 0) 0) 0) 0) L { C O O O O O O 66 O6- 6- 6- 6- 000000000 K m Zo = N n n n n n N- N- N- N- N- N- N- N- N- n N- n n n N- n 0) 0) 0) 0) 0) 0) 0) 0 D) o) o) o) o) 0) 0) 0) 0) 0) 0) 0) U) U) U) U) U[) OO U) N U) U) U) U) U) U) U) u) U) u) co- co- U) U) 2 C 0 G)0to 1 C d 2 t 9 V U y 7 D n N M sr 0) N- OD CO N n M 0) u) CO M v N- ,- ,- in .- .- Cr) u) ul 0 CO CO OD M u) MdC wR u)n M 0)O O a co N O O 0) n M 0 N v O0 O M n N M M li Vw fJ^ N CON nN nN CON CON CO N 0) O) 0) 0) 0) 0) O n O O N 0) n NN NNNNN NNNNN NN ,- .- I d d .0 N N N N N N N N N N N N N N N N N N N N N N Z ▪ 0> 0 0 7 N W W pp J F 2 Z y 0 t O n co n M N CO V N- CO N OD U) 0 V- M M VN O_ N 0) co M N- u) OO U) N CO n OD 7 M 0 0 v 0) n M _ N- 0) n Co o) 0 U) iri ao 0 0 o n n v o o ui o 0) ci 6Ce 0) 0) 0) 0) 0) 0) OO N- t; (O U) M N ' r- N V iO OO m 0) Ca z 0 COTa c I.L i cD n co 7 0 0) 01 OO CO a v v M v N n 0) 0) 0) V )- O co CO N N N- 0 OO 0) s- R ata CO N 0 M 0) 0 co n M M N O6 n V O O OO n O M CO 4 M N n O M co O N U) ,c3 0 U')) OD 0) N V N OO — M OO n 0) N N M a 7 V C On OO :4C) co, !D OD OD n n n n DD O co O O o) .- On0 co N COOO V' 'V CA, N W 3G OMD CCO N V N K .- N n N M NO 0) N M 0) O O O'coNcsi u) M M ✓ n O M (O O) NV n M .U)) CO V O fO 0 N a OD O ✓ U co L cocoN, n QD u) O0 OO N- 9- CO CO CO O) 0) 0) 0) 0) O E m m cD 0c6 cD co- m cD co- 0,co coco- to co co co co- co- co' co' N n n O co N 0 N CO 0 0 U 0 CO 0 v 0 0) v O v N a0 a0 n 0) N CO OO _sr V c0 U) cO OO U N OO 0 0 m N N O r- O) - O) O n n O) N N O u) N n n U) 0) O OO OD U) M M s- N V M M M N N N 0 0 0 M M M M 0101010101 010101011 a co •N a co 0 0 N V co V co co U) N N M 0) 0 u) 0) 0D J N R 00 Ob co n n CO U) M < N n O N- N- CO OO 0 M ON Q 6 co O O O N4 OO n O) V OD OO) n O 6 O O u) .- N N N M M M V V - N N O • o a E E E E E Q r o 0 o a a" a a" a" O d DO ' Z a a -i OM N co s co 0 co . m co O O n m V cO 0) coOO co O n 2 O cD2 cocD OO 2 O) N O n M O O Of _N O M sr OO M a ai V 4 0 0 R 6 0 OD R M A V R On N U) V a O) N U) to V U) u) n C OO N Ucci op 0 0) 0 N co co V n 0 M OO CO a n 0 M OD Q 0) 0) p.0 o. O p.O p.O 0.1- s- U N N N M M M M V U) L O u) n 0 co- O co- i a7 y co- y co- m DN co- 0DoooW oW W W m dco- P O 7 c c c c c co 0 c .. co o C >, d p0 E Q 1 N 7 ON O a u) 0 to i 6 a O) (0 O) U) 0 co U) CO N M O a a s O O Co (0 co O N o co (0 . co co co .-- 0) a a co CO N. CD N CO a CO CO CO 4- 0) a a N CO a 0 CO 1 U ,■ e- an 0) N N N 0) t0 CO ao O O) (O a N 0) N O N a O) Co CD N O Co O co N a co N O dD N O a N O a0 (O a N 0) a N a0 ,`am _0 0 O O O 0) 0) 0) 0) 0) 0) 0) O) 0) co CO CO CO CO CO N N N C` c0 co co co U) m 111111 gi 0 0 y 7 O Z Z Lc, CO N N C,) O 0 41.Q N N I` N O N CD CDCOCONLO Co CO N 0 N N N N Co CO 0 O N CO O) O) 0 CD C0 0 N O) N CO CO CO a CO 0 0) 0 O 0) N O N O Co a (0 0) 4- N 0) O O CD CD -Cr a4 O) C` 0 n N- N N- c- Co O a .- .- m N N a Co co O) a U) U m u JO H H 0 c C C a) a O O a Q' 0 N I . N O) CO CO CO 0 10 U) Co a CD CO O O) N Cr Na C0 CO CO a N CO CO 01 Q C c CO co co .- co Co CO O N 0) N (N 0 CO 0) 14.- a t0 M N O (O Co I"- CD CO Co 0 N CD 0) a 0 i0 N 4- N 0 0 CO N N 0 W CO CO Co n (N I L L 0 N O) a W O a M O 0 (O 0 N cd ch N N CO O O or O 7 7 Y O) CO a N 0) N N CO 0) C.-- M Co CO CO CO CO (0 N 0 1-4- Co 4- CO a 4- E O oil co CO CO CO (0 0 (0 0 O 47 a a a a Co Co CO CO N N N N 4- 4- s- 0 0 m m 3 IX C g N U) c0 N) c0 U) (0 Cn l0 M 10 l0 t0 0 (0 (0u)- C0 l0 N co- N N l() 0 E ' n a a a a a a a a a a a a a a a a a a a a a a a a a4 a 'C 0 N 3 m com coc0 cocom o coco (O (0 cocococ0 coc0 co co m m co co co (0 5▪ Y Y H 2 lL W O N 0 N 0 0) a a CO O a CA m 0 N CO CO CO Co 0 0) CO C. N a O 0 CO 0 a CO 0 0 Co N Co a 0 N N CD 0) 0 CO 0) CO CO a 0) Sr N O) CO N 0 a N N n O a (O N O N N a s 0 Co CO 0) CO 1\ N. 6 a n M CO a M M O co O) a (() O (c) M O N O N CO O a O N 0) Ni a ' O D O) m CO CO 0) Co (0 N 0) a co CO 0 N a 0 N m O) 0 N N N CO Co C O C 0) 0) 0) 0) O O O O 0 N N N N N N N CO CO CO Co Co Co CO In ca m N N N N N N N N N N N N N N N N N N N N N N N 4 Z 0) C7) a) rn 0) rn 0) co co Cr, CD a) a) co rn (n (n a) 0 0) co co m co a) a) rn co0) N N (n (n (D u) u) 0 h C0 0 (n N u) N N (n 0 N (Li U) c0 c0 O m -9- 2 c ii V R 'p C V d a 1` 0 0) CO Le (0 N Co Co a Co a N g',' a a N 0) O) Co ` C V d U)or 4 �) (0 r CD (O (0 (0 (f) N 0) v (0 0) (0 C� a 0) O a N Co c0 O) O w Zi d 0 N (0 N 0 CO 0 N 4- 0) N 0 COO cci O 0)cO N 0 N 0 N a N 00) cri) CD M 0 (� a 0 () N IZ' — — O O 0 o 0) 0) 0) 0) 0) CO CO CO CO CO C- N N- co CD CO CO (0 (0 v) Q' d L N d N N Di N N N N ' 11 la Ce J o z 2 Z M 0 W Q_ 0)a a N N N a CO CO 0 O 0 a 0) N N CO Cr)N CO CO O CO 0 sr CO 0 N a M N CD CO CO a CO 0 0) 0) CO CO LO CO 4) 0) Co 0) U) O . a CD CO Co (C) (O O a N Ni 6 0) O CO 6 6 0) N CC O N M c0 O) NmaOOV 0NN N CO CO Co CO a a s a s a a a a a 0 CL N (n ✓r CO Z Z O C it CO O M c0 a CD N N N 0 Co CO N M CO O_ N N O CCI (O N O) CO O 0) N Co a _ CD N CO Co c0 O C0 Co N aN Co 0 0) 0) N R N N cn N M 0) a n r N O CO c0 a M Ni Ni .— O O .- O N a an co N N CO co co CD c0 co N N. N N. N 1` N N N I N N N N I,- I 0 N 0) 0) 0) O) O) O) 0) 0) 0) W 0) 0) O) O) O) O) O) O) 0) 0) 0) 0) 0) 0) 0) 0) 0) I p) CO- CO CO CO CO CO co. 0 co- CO W co- co- co. co- co- CO co- CO CO aD co- ao co- co- co- CO a 0 0 2 co O Co 6 a co N N N 0 CO CO cu Co e" CO p© N N CO CO CO N 0) CD 0 • Co a N M CD Co M CO N U) N N N N U) N C')..., O M 0) 10 N 4- 1- Co O) , ' N a s N O Co co O a 0) N (rV0VCC 0M ' 0) N Co a s 0 N N 0 0 a s a @p V .)7 aa , CO a a 0) 0 0 0 0 0 0 0 0 O 0 0 0 0 O 0 O 0 .;7 O O O O O O O : O C co a) O) m O) a) O) O) 0 O) O) O W co- O) co: 0) 0) 0) -0) O) O) O) W co- co- 0) S N N CO. CO CMO CO. (GO 4- O) 0 Cr. N CN) a s 00 0 CVO 0 0 0 0) O a N. ro 4- 0 CO N Oa) O Co a 0 N a CO o am Co 0 0 N N O) i,,...; 0) U N N O O L O O O O O CoN N O O O O 0) W CO CO CO r r r C � Co Co Co Co Co Co Co Co M Co Co Co Co CO CO CO Co N N N N N N N N N N .i E 1 a Qm •I Y Q co V N. CO a CO a O) 0 Co O N 0) N CO O) N 0 0) O) N CO N 0 0) 4- N Co CO N 0) N 4- N a N 0 0) 0 CO CO N. m 0 4- N Q O) a n N O 0) N (D (O a M M a M O D) O) N- CO Ni 0) (p N co co 1` N N. CO CO 0) 0) 0) 0) 0) 0) 0) O) 0) O) 0) CO O) co CO CO 0) 0) CC U T U m 0) C D < O d r -) O mo mo O2 m Z d 0_ CO c0 0) CO Co Co CO N Co a CO 0) Co CO CO 0) Co 0) CO CO CO CO N 0) 0) N CO CO N a CO CO 0) N 0 O O a N Co CO CO Co N N 0 a I--- 4 a a N- O N V) c0 n h a CO O N N c0 c0 (C) N CO N N N ui CO (0 N ui Cn 0) N 10 CO 4- a N O CO CO O) N 0 CO V N 0 Co CO 0) N 0 CO Cr CO Q 0 CD (D (O N- N N CO CO CO CO 0) 0) 0) 0 O 0 '- 4- 4- 4- N N N Co CO Co I (- G c O 0) co- O) 0) 0 0 0) 0 0) 0) 0) 0) O O O O 0 0 0 0 6 6 6 6 O O W 0 c .. o Z' O Vo. g O C T E •o ii — a 'w 0,„ N m m t°) ain33a Cl)' Ei i O) M 0 O N Cr) V) CO V) I,- N 0 CO CO V 0) CO 7 m N 0 a CO , t U) CO O) CD O a CO 0 CO CO OD N. CO x- U) m CD s- 0) N CID N CO (O a (D 0) 13 al ,- co CO O N M M M M M M M4 (O O O) N N (O N N CO CO N 0) CO .3 co O V (O N N m (O M O N N m N m (D M O O CO U 0 (n U) (O R V V CO CO CO N N N N O O O O O) O) O) m CO CO CO C) = 0 0 h 0 Z Z > u0) J J ¢ N N CO N CO V CO O) N O) m CO CO Tr CO 1c) V CO CO CO 7 � CO N O) N O co N CD CO a N N V CD O O) i0 CO O CO i0 CO N c0 m (n )0 CO ( ( O O O N O O O 6 N NN NOO t` m C) N v N N N O rN r r r r r r r rs- N 0 ZQ '- CD CD N r 7 J0 H H 0 0 (0 2` cc i m a 0cc w ' , l0 N M CO CO N CO CO V V CD V N CO Tr 0 N )0 V N N N CO (O CO N 0 N. V CO CD N (D N LL) 0 V CO 0 (O (O CO CD CO (n N CD Cr) m m Q O N — CO — er CO N CO CO 0 (O M (O (O N N n CO N (O 0 0 v CO v CO L L 0 . •- N N M C CD OD M (O (O U) c0 O (O (O (D (O r- m m O co 4 co 2Y co co N 0) co co O CD co N m (D CO 0 N R CO (O N Cr) (D CO N (O O m mE co C •,c)- m O O) CO CD CD CD N N N (O (O (O (O c0 c0 c0 sr sr co co co M N N -; v v v V V' a s v v v v v c V c V V' 7 a v a v v v v Tr — . ?` N E 2 N 7 O (th Tr (O (C Tr(O coc (O (O (O c0 co ((D (o (o (m (O (Cr Tr Tr 4 Tr Tr Th Th Tr Tr (O ((O 0 ((O m (D (O coca (m Tr Tr Tr Tr Tr Tr o (m To Y Y H z Lic W O) N N m N O) 4- co O) NV 0 N N N CO c0 0 CO 10 0 0 CO c0 N O O) N OM (O O N COLO a CON M O cO (O m N N O CD v NON m 0) CO COCD CO CO CD O CO a CO 7 n CD O N. N O O V N N CO C) CO CO CO N m (O N N N V CA N CD N 6 V 6 4 N 6 N N O) O 0 .a C) CO CO N N 0 O CO N CO N Tr ? V c0 c0 CO CO CO CD CD 10 10 Tr M C O 0 CO CO CO CO CO CONNN NNNNN NNNNN NNNNN NNN E.' .0 L e w N t+ 0 N n n n n n n n n n n n n n n n n n n n n n n n n n n m co m m m Z )O ) O) D) m m D) m m D) D) m 0) 0 0) 0) m m m m m D) co-Ce UUri Uri U) L U) U) U) 0 U) U) Uri Uri Uri Uri U) co- co- co- co- U) U) Uri Uri U) '.. d C it; c6 C) N C U N C 'O C () 2 3 N r co N (O co a co O co M co N (O (O (O O N. c0 0) O N CO O N C y N CO CO CO c0 m CO N CO N N CO (0 CO N V N .- O )- m CO N V CO O N m m CO CD m O N4 N m O O O O co (O N N N6 V an M co O w"2442, 336 1 V m CO M O N V .- m (D M O (O a O CD M N m (O M O N a U N m ). V V V' M M CO CO N N N O O O m m m CO CO CO CO N N N iiO o ii r R - J I Z (0 0 W C o coNW- N cN N CSD (MO (00 ,- 00)) (CD (Tr n V )- COM (m0 V (n m 00)) Vim) Tr O CO V I CL NO O m N O CO MN N m r N c0 N N N N co CO C) M M r N V' M W m (0 N co co V co N N N N N CO V Nr V V co M N O CO c0 (O V V V V V V V Tr Tr R Tr Tr ? V V V C V' V 7 Tr V Tr CO m z I z 3 7 co co c it 0 m CO N CO m CO N 0 R CO CO V V N CO N (O CD N CO m 0 V V - CO CO N CO CO CO CO (n CO CO N (O N N O m r` N V CO CO N m m (O 1 (C) N N N N O O O O N N m m m m CD O O N O ^ n N n n N N N n N N N n n N N n (D (D (O CD CD (O CD (D (D (D I C) m m co m m m m m m m m Om m D) 0) m co m m DO) O) Dm m m O (o co- co- co- co- co- ao ao ao ca 0o co- co- C m co- co ao op- m co- on- co- co- co- ao co- a i N ,O (? m m N CD (m (00 NO n ON V vM r M N fi3M N N M m 0 R Tt^ V (D COON .-- .- N V V V V Cr V C 7 V CO CO V ? V , : V 11r CO CO CO co co co co co co co O O O O O O O O O O O O O O co0.;!! - O O O O O O O • 0 C F m "-- R R N N (D m CO 0 CO (O N N CO N _ N CO CO CO N CO 0 (0 CO N N CO CD CO N O O CO N N r m CO N CO O , W m V O N N N O M m O M O m (0 m a O . C) O CO M .0 (D m m (D Un UD v v v (D (n m N N c.7) m N N n (D ro m (D (O U) v co .. NNNN NNNNN NNNNN NNNNN NNNNN NNN C N °_. a m 73 Q (0m O M co co coN CO R COC(O CO OD 0 N CO m N N 7 CO0 N CD 0 CO CO - m V N . Tr NN m"-CO 0 s- N (O Tr CO N N Q ,• m m . CD O O) O O m CD O m m O MN N 0) 0) 0) 0) ' O N N- (p m CD m co m CD m m m m m CD ma) CO m m m m m CD CD m m m m m U >+ V C c I O d 1 LL co m 0 U M O O O ,. O 2 m EL a -) =3Z co co co co v co co O co N O (O CD N N N (O CO N M N.. ‘- 0) ' V M CO CO N CO CO CO cr. N CO CO N N CO N Tr CO CO V' CO N Tr CO • a LC) c0 N u) N CO c0 CO N N (O CO (0 (0 m (C) O 6 (O 6 N 6 c() U) U) O co (O NO COCIDCONLO CO Tr NO M (O O N (0 CO .- V N. O co N m a v v v (O c0 M N CO CO CO N N N CO CO CO m 0) m m O O O .0 0a 0 0 0 0 0 0 0 0 0 0 06 0 0 0 0 0 0 0 0 CO U 0 0 >. CI C CL st m C) N C •O d y y N U d M 0 U) CO VI LOO 0) CO N co M I� 0) (0 1 •1 -0 W 0 ‘- 0 co V ai N O N- i) co csi N 0)0 W= U U O N- N- r N- (D CO (D (D LO CO I21- E 4Z O O CI) = o m z z — (C) 0) 0 0 Q N N CO 0 0) (0 0 LO N O O CO CO 0 CO 00 0 U N 0 N O O O O N 0 O a\a` Z NNNNN U N N Q O) 2 • 3 JO • 12 12 o O ❑ O a, a- a I N N O O n Y to - ct N 0 0) 0) 0 ¢ O Ln N 0 N. N (O V N L L VY N OD I- V N 0) N- (O CO I O_ o o E LO (T N .- .- .- a- 00 00 CO CO O Ct = - 7VVVV4CVV>-]. OE •,:-.7, o 7M0 CO (O (O (.0 (O CO (0 Y Y H 2 ❑W W IIi • N. N 0) CO CO V CO (f) M M N M CO I- CO CO 0) V 0) O 0 N (O CO M , 0) NN N N CO LO M M M 0 'C C) O 0) CO CO N- N- r N- r I COC _ _ _ _ _ _ _ r L N I- N- N- r r N- N- N- N- w co 70 0 0) 0 0) 0) 0 0) 0 iZ tO lO LO LO to LO (O N M O (OO d C (O N y N- N C N U i0 U ( y 0 0 ) 0) N- LO O O N CO O p co C j U N tO 0) LO O M O O C ,D276 M M (O (0 LO M (O O O wtr, 0) U N 0) (O CO O CO (0 V N O 0 L r m a O T R LO(0 CO CO CO (O (O LO LO U ❑o ❑ O 0 )0 ISG co 6 I') N CO J I- E Z U) ❑ W — M 0 Qco 0) co 00)) CO CO O N CO Q) (O (O N (O M O 0) O N W M N- N- (0 CO CO LO CO CO co co co co co co co co co d Q) N H m ? Z O L L L L L EEEEEo m Q 0 0 co M N "7OO 0) (0 (0 -O -O -O O T N M N 0 r-- r N 0) CO C O O 'Dal a) C m co O 0) N O N V V 6 N N CD (4 N N N O 'O c0V •V N 0) N- LO M E o O O O 0 Q) N 0 0 0 CO CO CO CO CO CO a s a a a N CO- CO- CO- CO- 0 ao U 0_ WO d il d o a`) N a p7 c c c c c0_ , CO0 (OO C`.)) 0) N V CO O M N- '- (O O V 6 O (0 (O r r O O CO O 0) (O M N `4T CO 0 N N N N N N N (O V U) V N 0) 0 O - N- - N N N N N N N N I 0 Lb N- M M (0 0 W N •- '- 0) CO CO V N O y O O O 0 0 0 0) 0) CO U ❑> F 0) 0) 0) W 00 co- co- 00 cci C 7 • 0 0 0 (0 M I- M N- co 4- N CO U .- N 0) M M I� (O O) LO V N LO CO N.- C0 CO J LO 1n O 0 0 LO N V c0 N V CO CO N N N _ 0 0 0 0 0 0 ' CO co N M L LO (MO (( O O CO CONCO N. n r M O Z 2 �'. N N N N N N +..... N N N M a- 0 E _ N °_ a • ,„ 0 (O m 'N ,a- <Q M r CO N. (0 V0 0) CO , I h°2 N CO- LO (O CO N CO 0 N To .c M I- N M N a) r- O V co co co (- N. a U = N .1. 1`... O M (O COO Q CO 0) .- N LO Cl. .- .- r' ..E N V 7 V LO co co N 0) .- cri d❑ _ N DD 00 CO CO CO co- co- Q J O O ,- N N M M CO N > CD TO O N U � 0 0 C ° ECO coN7 O O M co co co LO O I N N (O CO •O 0 0 0 0 0 0 0 co Q L d N CO- d L N 0) V N Ln L/i 7 , 1 co co 0 1 N C f� O M (0 0 (0 0 0 0 F N 6 y 0 0 0 0 0 0 0 V I O m ,- 0 ( N d 7 co- O co-- 0 0) 0 0 z d 0_ co N- (0 .- LO — N- 0) O �iI c m ❑ — O V CO CC) 0 0 CO M CO CO O E U. M LO V (O V M N V - co N CO CO V I� O N (0 V • a N N N M M M 7 7 V m O C to cl cU m ° mmacaoO �� « CD N y co 7 0 co U a y ❑ (I) co • • II N V' W V' Northing(150 usft/in) off Y= 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 41 N 0) 0 t0 N 0 8 n CO 8 CO .- 8 O N N u,Ql N m rn m rn m rn rn m 8 m gi 2 u'1rn to m N N 63 to 2 8, 8, u') u'1 u7 N � 647400- I--647400 I co 647250 1 ! 7-2 m t----647250 u u W : - { { --t ---� - ---- -- -- 647100 R 646950I --t- --646950 646800-- ...:... _:._.... ---�- } '- _._ -_-. i __--646800 Y i e 2 o e € 646650- - _.._+ ._--- _- .7 __- - --- ---646650 a .e d 1 646500 --- T,_.a 2. - :'-OBD; --. ..646500 g 1P51,1 646350 -._ - - 646350 ( Ey cccc Zs�'cc; 646200 --- - 1- -- f -- I .646200 /i_ 0 646050 (9m N„ 646050 I I - $6 ,-T - r-- , --- ' 645900. j._ OB'6' ..-- -- - j--- 645900 0 o; 645750. N 1 °046,Op.'8. _ _... ! - -- 645750 \l mo 645600 m N --F- - -- --- 645600 O 0 0 ? pOb o ¢ 000L .R 646450 0 LI < 645450 to J m m 645300 p o ,m wc o -o d o _.. .:.. .._ -t--_ 645300 a am C '� . C O 3 F y 645150 .- I... -----1 — 645150 w 0I col m J w 0009 a O 645000 , m m i-- { ! _ 645000 04644850 -e in r '�� 644850 oft I]n p $b1mR C I 'H-- O •,...C4�L,IJ 4 a a '� 0 0 1 s! 1:61g2c0 644700? • • 50.00 z bp North America - ALASKA - BP Prudhoe Bay PB J Pad J-10 J-10B J-10B Anticollision Summary Report 01 September, 2015 OFFSET REPORT for AO2CC BAKER HUGHES • BP • //MI bp Anticollision Report BAKER 0 HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-10 Project: Prudhoe Bay TVD Reference: Kelly Bushing/Rotary Table @ 69.20usft(NORDIC 1) Reference Site: PB J Pad MD Reference: Kelly Bushing/Rotary Table @ 69.20usft(NORDIC 1) Site Error: 0.00usft North Reference: True Reference Well: J-10 Survey Calculation Method: Minimum Curvature Well Error: O.00usft Output errors are at 1.00 sigma Reference Wellbore J-1 OB Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: J-1 OB Offset TVD Reference: Offset Datum Reference J-108 Filter type: NO GLOBAL FILTER:Using user defined selection&filtering criteria Interpolation Method: MD Interval 25.O0usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 500.00usft Error Surface: Elliptical Conic Survey Program Date 9/1/2015 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 8,925.00 GyroData Gyro(J-10) GYD-CT-CMS Gyrodata cont.casing m/s 8,949.00 11,424.39 CoilTrakMWD(J-1OB) MWD MWD-Standard Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB J Pad J-01-J-01-J-01 2,756.34 2,750.00 483.60 37.75 445.85 Pass-Major Risk J-01-J-01A-J-01A 2,738.04 2,750.00 483.40 37.56 445.84 Pass-Major Risk J-01-J-01 B-J-01 B 2,738.04 2,750.00 483.40 37.56 445.84 Pass-Major Risk J-01-J-018-Plan#7 2,738.04 2,750.00 483.40 37.56 445.84 Pass-Major Risk J-05-J-05-J-05 3,333.98 3,425.00 438.46 41.95 397.24 Pass-Major Risk J-05-J-05A-J-05A 3,333.98 3,425.00 438.46 41.95 397.24 Pass-Major Risk J-05-J-05APB1-J-05APB1 3,333.98 3,425.00 438.46 41.95 397.24 Pass-Major Risk J-05-J-05B-J-05B 3,327.30 3,425.00 438.47 41.86 397.30 Pass-Major Risk J-05-J-05C-J-05C 3,327.59 3,425.00 438.35 41.81 397.24 Pass-Major Risk J-05-J-05CL1-J-05CL1 3,327.59 3,425.00 438.35 41.81 397.24 Pass-Major Risk J-06-J-06-J-06 3,299.27 3,325.00 218.68 54.72 163.96 Pass-Major Risk J-07-J-07-J-07 3,575.00 3,650.00 239.39 59.71 181.53 Pass-Major Risk J-07-J-07A-J-07A 3,575.00 3,650.00 239.39 59.71 181.53 Pass-Major Risk J-08-J-08A-J-08A 4,486.92 4,775.00 452.60 59.90 399.40 Pass-Major Risk J-10-J-10-J-10 8,950.00 8,950.00 0.11 2.67 -1.86 FAIL-Major Risk J-10-J-10A-J-10A 8,950.00 8,950.00 0.11 2.67 -1.86 FAIL-Major Risk J-11-J-11-J-11 2,224.97 2,225.00 87.47 32.10 55.38 Pass-Major Risk J-11-J-11A-J-11A 2,220.80 2,225.00 87.45 32.07 55.39 Pass-Major Risk J-11-J-11APB1-J-11APB1 2,220.80 2,225.00 87.45 32.07 55.39 Pass-Major Risk J-12-J-12-J-12 2,797.40 2,800.00 406.56 38.24 368.39 Pass-Major Risk J-13-J-13-J-13 3,442.26 3,525.00 184.20 49.93 134.99 Pass-Major Risk J-13-J-13A-J-13A 3,443.81 3,525.00 184.22 49.85 135.11 Pass-Major Risk J-18-J-18-J-18 2,485.76 2,725.00 459.70 105.05 355.10 Pass-Major Risk J-18-J-18A-J-18A 2,485.76 2,725.00 459.70 105.05 355.10 Pass-Major Risk J-19-J-19-J-19 2,113.80 2,125.00 58.37 31.71 26.67 Pass-Major Risk J-21-J-21-J-21 2,931.57 2,950.00 152.50 41.95 110.57 Pass-Major Risk J-22-J-22-J-22 3,100.00 3,125.00 107.24 43.94 63.31 Pass-Major Risk J-22-J-24 2A 63.31 Pass-Major Risk J-24-J-24-J-24OFFSET _•PC0hrfOf. 0GC 5.11 Pass-Major Risk J-24-J-24A-J-24A 2,014.71 2,025.00 31.09 25.98 5.11 Pass-Major Risk J-24-J-24APB1-J-24APB1 2,014.71 2,025.00 31.09 25.98 5.11 Pass-Major Risk J-24-J-24APB2-J-24APB2 2,014.71 2,025.00 31.09 25.98 5.11 Pass-Major Risk J-25-J-25-J-25 11,350.00 10,200.00 32.82 185.08 -151.89 FAIL-Major Risk J-25-J-25A-J-25A Out of range J-30-J-30-J-30 855.21 875.00 496.88 13.19 483.70 Pass-Major Risk 9/1/2015 11:49:37AM Page 2 of 3 COMPASS 5000.1 Build 61 0 BP 11110 0 bp Anticollision Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-10 Project: Prudhoe Bay TVD Reference: Kelly Bushing/Rotary Table @ 69.20usft(NORDIC 1) Reference Site: PB J Pad MD Reference: Kelly Bushing/Rotary Table @ 69 20usft(NORDIC 1) Site Error: 0.00usft North Reference: True Reference Well: J-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore J-1 OB Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: J-10B Offset ND Reference: Offset Datum Reference Depths are relative to Kelly Bushing/Rotary Table @ Coordinates are relative to:J-10 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927(Exact solution),Alaska Zone 04 Central Meridian is 150°0'0.000 W° Grid Convergence at Surface is:1.10° Ladder Plot 600- 1 1 I 1 I 1 1 1 -II A S3 450 " a�. :`4, , airz.,:o r - . 0 1o in CJ J J J cal.)as m1 ,. 11! Hik� 300 'CIIMUNIC' atl- >v 1 1 I 1 "0.i,p O I x a.,▪150 A • 0 ,M . eer en. ■ IAl ' I F/( 0 1 L 0 2000 4000 6000 8000 10000 12000 Measured Depth(2000 usft/in) LEGEND J-24,J-24APB2,J-24APB2 V5 -e- J-05,J-05CL1,J-05CL1 V2 -e- J-11,J-11A,J-11AV1 J-24,J-24APB1,J-24APB1V7 J-05,J-05,J-05 V16 -4- J-12,J-12,J-12V1 J-24,J-24,J-24 V3 J-05,J-05APB1,J-05APB1V11 -X- J-18,J-18,J-18 V1 -4- J-24,J-24A,J-24A V9 -fir- J-05,J-05B,J-05B V14 -4- J-18,J-18A,J-18A VO -4- J-22,J-22,J-22 V3 ---/--- J-06,J-06,J-06 V1 -4- J-19,J-19,J-19 V1 J-22,J-22A,J-22A V1 ' J-07,J-07A,J-07A V1 J-21,J-21,J-21 V1 $ J-01,J-01B,J-01BV7 -0- J-07,J-07,J-07 V1 J-25,J-25,J-25 V3 J-01,J-01 B,Plan#7 V4 J-08,J-08A,J-08A V8 -0- J-25,J-25A,J-25A V2 " J-01,J-01A,J-01AV1 J-10,J-10,J-10 V1 -44- J-30,J-30,J-30V0 J-01,J-01,J-01 V2 J-10,J-10A,J-10AV3 J-13,J-13,J-13 V3 9/1/2015 11 49 37AM Page 3 of 3 COMPASS 5000,1 Build 61 I 0 • u' U7 0) W .J CL Jo j ed Cr 2 N W W O WH N F d co c n I O 0 o a Y N ti). CO H Z 0 0 U C ,- m 0 W 0 aOi o = J U U YU) O Q CI)W 0 J m CO J N E ¢ f c9 ccei5 co >, ° ) O e o C7 0N Oc < N w = O a aV O O O C) O OD U I O N In — O O CO W O O O N O/ 1 N i (0 N 0 E L 2 2I C7 O j y` N z. Nf` N CO N U) 2 m/ al E O U -4- --.7. 0 2 0 W d) c ,ca1 o o I 0- r O Z n 0 H • O ',a o E 0 • o W _ 0/ 0H 0 2 r a a� m o a cc c co n' co a' O 0, J f N E ` J 2 2 O_ N to Si - U W J " (n >- d O H O V Un C O W N_ a w N N JC N u) m O %/ E d 0-3 O m 2o m N o a > 1 ` U) wO: -O N C 0 0 ii' C OI CA o a-) 0 N N > co W 2' O OC ... N 41 +' C C Q C d2 E LO o E o e x X 3 > a �,: �n w ry m 0 0 W W in a > N G> o 0 o. m ' a o E E cf E U a o E Q d < o 0 Eg .a ¢ 'D V N L l N O_' Ct V 0 U m m i • O O T/ @ u) NO1 . /. NZ N / U1 (n co .o d a - .. Y o ui 5 rn a D d m Z E / _ U co ch o 0 Lri L° +0+ / C 0 N .- co oD co co E v E m - r z > i U co rn v f Co U O_ :¢ I / / ' 0 n 73 N T E C C H H Z > 0y o w C7 o x P�iaa y° 2 . ¢ H U 5 F° o O Q w O O W O ce J J U_ W 0 m CL 0 H Z 0 J ¢ W ¢ 0 w 0 CC Ce Ill a 0 Z H Y M /' Z 71Z W ao Z O _ Z co Z W H w I0 W o O H rn m /i.�� N W ¢ U O2 w ¢ � o0 w f%'o cr m O aC CL w — P- vo Q Z W W WoQ � = • U) O_ " «. f U d � N > N to a -j ¢ 4 Z' C „, Q E O O m U U o r E CO w a Z CV gigO ! ` W N RI y g - v s ' a c m m E H co z o O v ' N O c `p m la U Z IN £ N N 01 W /` a a o c U a cr) aEi 'ci °i ui j aoi a �,. o - o A ui a. > O E a N ai U d E OS H m -In ' o. c C 20 m o Z H� o > T O C7 C OS c a� O f o f i o , N N o. . .0 .4 2• o_ 'O V L -0 w o co _ Cs /..,_ 0- 0 0 o w U ' 8 8 a w x u. in a } in 0 2 0 o 0 0 0 0 N • U (0 .ci d O 7, E N t Q L 2 CO N Q 00 p J n n z' O O- 'D D U E N H . S P. 2 co m7. O O a) azi a, > M 4 O -a C` -O E n N z z a U o i o . a) 7 n O 1- m I- NN 0) 0) H0 Ha) I,- O >>' c6 Z a al � nN o LL ONH E a a z1= U 0 p U m n H C ❑ Z co w c ❑ c d 7 W O Y J LILL Y6 Q X Un N J -J a C N d = E 3) '/-') E E ;; ° o w o m E Z Z n n E N m a a3 a - Z ' N N LL = } "6 N O - a c a. I> s m d N m m ; " G "6 ! 'e 1 a� a a m' ? o 6) c .. YYl 0 ❑ IO cx.E H c 2 O o)I0) m Un E N C o CO W R 1`° m O m a n 2 , p J t0 - U ZT ce Z N N H H O C d m y a m y O > o o N 1 c H wa rn E y "m O1 E E c c N c 03 C',', a. y o o, } a X 1- a z � U 0 ,_ o U U N Gi" ,o o d E p Q m a 2 a s m y a o a �''' N m Y° aa) o 0 o aE) o 0 yon on >- U U I H - CC I Zr. "� 1.0 ❑ m H a - O 1 N ❑ ® N Z Y m N gi 7 m ro ,4 l . U N �H a a Z E -o °) a o) ai m o a s W H a`n' z N3 m E a 0 a) ° o r z > o 0 j o Co m .co o _ H ❑ y y i5 in Q U m E ) N m o) H co t r 3 2 'E)). co a) o O J a OO O. C)p = cam O _,mNv x � a O 3 FL. O N w H O S W o O C_ r O o ,- % n r) Vai @ F w N Q ❑ Z N m — a. w a v o a) 3 N c CO E a c o CO Ja E m ori > a o n z U > Z Z Z U v W N W m y C l0 w O r cm z C en a E o I W a c N v) f z 0 W N J ty0 c p N • T U a) Jco r E m U a Zit U U E U 3) N UU ~ N 5CU O-0 -of fiD U ZN W N T N -lo a -0,,,</%0If, , Y O .. cdId O w C C 3 dO H I- a. dl UN N_ Q E1ECC a c H c E am `U = co UH I a W O 7 • c H H U ,/ ! 215112 26231 NMI BAKER PRINT DISTRIBUTION LIST HUGHES Please sign and return one copy of this transmittal form to: COMPANY BP Exploration Alaska Inc Baker Hughes INTEQ (mandatory) 795 East 94th Avenue DATA LOGGED 41,/9/2075 WELL NAME J-10B Anchorage,Alaska 99515 M.K.BENDER (mandatory) FIELD Prudhoe Bay to acknowledge receipt of this data. (mandatory) COUNTY North Slope Borough LOG TYPE LWD-Coil (mandatory) (mandatory) STATE Alaska BH DISTRICT Alaska (mandatory) (mandatory) LOG DATE: August 11,2015 TODAYS DATE: 3-Sep-15 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: Patrick Rider EMAIL: Patrick.Rider(@,bakerhughes.com bakerhughes.com (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? No COMPANY FIELD FINAL CD Final ADDRESS(FEDEXWILL NOT DELIVER TO P.O.BOX) LOGS LOGS (digital/image) Surveys PERSON ATTENTION #OF PRINTS #OF I'KIN I S #OF COPIES #OF PRINTS 4 4 L 4 4 4 1 BP North Slope 1 '1 - • ° y , EOA,PBOC,PRB-20(Office 109) Attn:D&C Wells Project Aids Agatha Rutka&Barbara Glassmaker c 8 900 East Benson Boulevard SEP 0 2 U 1 i Anchorage,AK,99519 ApaCii 2 ConocoPhillips Alaska Inc. I 0 I 1 I 1 Attn:Ricky Elgaricio ATO 3-344 700 G Street Anchorage,AK 99510 3 ExxonMobil,Alaska I 1 I 1 I 1 I Attn:Lynda M.Yaskell and/or Lisa Boggs 3201 C Street,Suite 505 Anchorage,AK 99503 4 State of Alaska -AOGCC 1 1 2 I I Attn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 5 DNR-Division of Oil&Gas *** 0 1 011eF.I? I Attn:James HyunG +,,\� 550 West 7th Avenue,Suite 802filk % �V Anchorage,Alaska 99501 k*Stamp"confidential"on all material deliver to DNR S� CFI 6 BP Exploration(Alaska)Inc. I Petrotechnical Data Center,LR2-1 900 E.Benson Blvd. Anchorage,Alaska 99508 TOTALS FOR THIS PAGE: 0 3 4 6 0 0 TOTALS FOR ALL PAGES: 0 3 4 6 0 0 • • a D co1 71 c " W 2 cr 11 1/ Z Cr CO ` S 0 c CD p N pp. r. L Q toW N = W N 3CD XCD C I 0 P r D tn 0o r /„. „ X pi0 o o lari co O 0 i. , in iXo cx colgin m 01 H 1111 N N' oa to ti N 0 0 % £ £ » e £ £ 71 CO CO . 00 o e ¥ f@ � 0 tv A. / \ _ _ ©00 7 } ® N0C - _ / C co ims \ § z � ) o 0 - o oo � 7 0 - PO CD CD•• ' =co ; = / P \ Cr Co \ } 2320 S. z = o a + + ( / / % G = } } & f N § / ` Co CD 0 } 03 \ A0 � 0 \ < . E o — e a 9 § 2 o ° _ - Ox \ CO 03 7' CA CO O w \ \ . 3 co 3 ( 0 ) � \IN m \ DC CD 7 cn\ \ o a o * m z ; = a 0 m z m " / 73 3. k rb m - '51 © _ + -I CO 0 .. -n k k 0 .. \ C CO co C -o CCI -5' ..< 0 m » - cn CID M co E -cm - - 0 O 9 ° § / ° C0 0 ® z § ) E & & to CO No § k } 222 ° o DCC 0 CD2 ( � � 0 ! 7 - .. —• - 0 ° { xi _ 0 � 0 . 0. 0C 0. Z ; CD 0 r E a 2 tt a m _ c E 2 X X * _ a , ) 7a $} E CD .. 7 \ / $ ; Co CO cr \ 2 » CP CO CD { / C0 CC) - - 276 % [ QQ R \ 00 \\ § 17 CT 0 // k \ \» % _ & \ 0 \\ ■a ° -4 (00 ° c� § * z ° \ \ § § §■ \ .-t I" • • c (0 Co O * * CO, v 0 W C CD N (D N p 0 co. - ? 3 va In w 3 c T v :1- < co x 0 H ° 0 6 Cn O (O OD V 0) CT A W N - O co co .) 0) 0 A CO N - co 3 on W O O O O O O O O O O O O O O O O O co O O N O ' N N 0 0 0 0 O co O co O O O O co O O O O O O O CD 4, 00 3 0 0 0 0 0 0 0 0 0 0 o O o 0 0 0 0 0 0 0 o 0 O o O O O O O O co O O co O O co O O O O O W co O L L -0 -oZ 0 0 o W a 3- °3 CO p D m N 0 7 - coCD 0 N 133 N N O 0 A O 0)y 90999909990 0999900099 co O N DDr W A -s W N O N O N N O) in 0) 0 J W W A W -, O 0 CO co co (T O J CO (T 0 (T J 0 V CO 0 W 0 W 0 N (T O 0 ' CO (n c 7 C D N N 4' K.)- 1 Ncn co 7r d -<C o N <• C_ _ _ _ _ _ N _ _ _ _ _, _, _, C L W O V 0) CD W (T CT N CT A CO N N W A A f 0) V J v ..SV CT N O) N W N O co O W A 0) V Co A Oi (T 00 0 0 0) O Co N J N A O J 0 OD -3 0) � 4) -. O) Nb co OO CCDD O 0 0 0 C 0 O -‘0 O -• 0 0 CCD O 3 C L W W J 0) N A W N - O co CD V 0) N A W W N - O CD CD CD CD CD CD CD CD CO CD CD CO (D IO CO O CD 0 0 0 N (D O CD (O (O CD CD CO CD CO CD CO CO CO CO CD CD 0 0 0 CO (D O O O CO CD O (D (D CD CD is, cD CO (o CD (O O O O A Cn CT (T CT CT Cn CT Cn 01 (T O) O) V CO CD CO 0 0 0 C,) K W 1 O O C (n O (O CD W V O) VI A 1.3 N O co co V 01 (I1 A W N ... N .Z{1 CD co W W W W W W W W W W W W W W CO CO W W Co W A W 0 0 0 0 0 0 99990 00000 0 0 O O O O J V V J V J V J V J V J V J J J V 00 O O O T A (T N Cn (T (T N N (T (T N 0) 0) J CO O O 0 0 0 V 0 v C m Z 2 Ca N `(D D V V 0) 0) N (T (T (T N m m Ut (T A W N Is L O O O • N a CO O) N Co V O) O) V O N) coC.) in A W 0) - N O O O --s N CO CD - O A CT A N A N CO A CO V G) CO 0 Cn .� 0 p) S O co.• co m 0 C m a (n c c o 0 0 xcn O m w f0 a m S m 0 `c 0 `G .Z] It CD 0 3 A DC N COCOCOO O 2.. N N O J 0) 0) 0) 0) 0) O) 0) O) N A W N 0 O 0 0 0 3 CY CO O 'CO W 0) A N W in A O W A N m CO A O O O C N n 1; 0. 0 (D 0 0 0) CD Cn A C,) .§ -, CD A 0 0 C n co N O co 7 '! N Ow O co''' (T CT N N N Cn CT (T Cn Cn CT CT 0 N 0 N (T 01 N CT 01 0 O O O c0 O O (D O O O O CD -co O O CD co CD co co (O ---0N V V V J J V V V J V V V V J V V V V V V V P. 7 co O o O O O o o o O O O o o O O O o o o o O V J J V J V J V V V J J V V 00 O W W 00 OD O "' 7 0 7 CD CD O CD CD CO O CD CD CO CO O CD CO 0 0 0 0 0 0 0 CO O. n 0) O V J V 00 00 00 00 ') J V CO CO O N N W CO CO CD O J N in W -, - O V 0) CO A N N W O is -, 0) V A W N A A --. W CD CO CO O J A A 0) 00 CO A CO A J J CD CO V CD CD N) W CO CO CD N Cn CO A W W V 0 m K -I 7 m 0 5 2 ci. m m W 0) 0 CT 0) 0) 0) 01 0 W 0) 0) 0 0 0) 0) 0) 0) 0) 0) 0) S » 3 N ,�•.7A A A A A A A A A A A A A A A A A A A A A W W co W W co W W W W W co W W W W W W co CJ fJ m ,-• A C Co W j N CT N Cn CT (T N CT 01 N In CT In CT N Cn CT 01 N In (T (0 CT 3 C C 0 (T n A A A (T Cn CT CA A A A A A A A A A A A A CD (0 0 O O O CO CD CO O CD CO W J 01 0) (T A G) W CO W W 1 0 A W N Co Co v O OD A CO CO CO O ? Co A W > C (o co co (.J 01 O A CD 0 N CO V CO W CD (1) W V G1 CT W CD CO CO (T 0) W N CO 0 0 CD CO 0 CO CT V N A 0 N O) m O O c m N d d 0 Z oOO m Dd) O N 0 6 0- C CO (p N CD x z @ @ 0O 0 0 0 0 0 0 0 0 0 0 O 0 o O O O o 0 0 o O 0 D) 0 O W N O N W N N O A W O N - O in W O N N O co O A J CO Co Co Cr, Co co N 0) N 0) J 0) N CO O 0 O O n C C ti co 437 E.0 01 Z z Z P x . oo \ � ° � � ENE J J V 0) CO 0) 0) 0) 0) O) 0 A W N 0 O O co O III ■1 R N -, O Co (T A 0 V D) N O) O) V V (O - 0 � O O O 1 il C) 0) W 0 CD O N J CO 0 V 0 01 0) (D W CO Cr. CO N 0 • • c CD co o, m • -u o C CD CC c CD va 0 m 3 !? co A A A A A A W W W W W W W W W W N N N N N N N N N N N . ( ci S moo N A W N > O CD CD V O (T A W N > O CO O CD CD V 0) C) A CO N > N 000 00000 00000 00000 00000 0000 000 00000 00000 00000 00000 0000 n bob O O O O O O O O O O O O O O O O O O O O O O O O t O O O O O co co O O O O O O O O O O O O O O O O coo O O C L C 71 1:1Z > W G O O O O (_ a s m 0 10 o > E. CD o CT 0) CD 0 a) NJ NJ N N N NJ NJ NJ N > > > > > D CO V a) C 0) V CO 0 N CO m A > O Co V O () W O O O O O O O O N (O Co W O CO N 0 CO V O O) N W A C) > N CD W O A W > W V V N NJNOV NJ N CD CD 0 Oo O V O O N V CP V O W V CD CP V co N. W e N. _, C CD Cb OD CD CD CD CD CD CD Co V V V V V C) O O) C1 c0 A V 0 O O C) > v CO Co V V V O) O) A A CO O) Co O A Co a) NJ O O) NJ N a) V CO N NJ N CD in (O (n N in CD (O O O CD CO CO CD W N (O in O CO C) N W CD O) CO O O O O CO CO O 00000 00000 CO O CO 0 -e -3 -3 C A A A A A W W W W W W W W W W N N N N N N N N N N N N 0 0) CJ N > O (O CD J C) in A W N > O O CO Cb CD V O) in A W N > O CO O > NJ W A (C) C) V CO CO CO CD 0 0 O A CO A CO CO O O CO CO CO CO N W A Cn CO V Co Co V W CD N O 0) CO O CO CO CO CO CO CO co CO CO (O CO C) O CO V C) 40 W A O CD co N O CD > A V CD CO CO CO CO CO CO O CO O Co CT CO co O CO a) W N A 0) V > O) A Co N W W A A A A A C CO CI NA A A A W W CO co W CO co W Ca W C,p N N N N N N N N N N N N C6 CQ W N > O c0 W V a) a) in A W N > O O CD OD V V a) (P A W N > O CD N W A N co V co CO O > N NJ N N N Co CO CO W CO W CO W CO W Co A W A C) O V CD CO CO V A C W N V CD CO O O 00000 0000 W V V N W iv > N 'co D O) W CC Co C) CD N in O) V V V V V V V V m O W C) CO Co O O a) W N A C) V CD A CO N W W A A A A A 7 Cy C C Z Ca y ,. A A A W W W CO NJ N N > - 7 W WNJ N _ N V CO COCD 0CO C) C) O I. CC O CC CO CP QD Co CD N V C > V O) O W N W O CD O) CO N A > CO in V CO N CD 0 > -O N 0 W > O V V O a) V A Ca (1) A O) O CD 0 O) O 0 W Co A O 0 C m d C Q 0 c. O CD m ? - a CD) A A A W CO N NJ > -+ > Co K CD 0 A c0 0 O O V NJ CD N > CO V NJ W > > C) m CD N O W O W O C) O O a) O co W N V coA Co W O CO V V V V V V V 1 N V N O CD O) A in N W W N in Co > (T O O 'co 'co j V 'co in is > (�F) m 7 A b CO Co CO NJ O) V O V V N O V C) N > NJ A 0 V A CO CD a) (n C (� co n O. CD C co CDD g O A () (D) (n C) C) Cn C) C) C) C) N (P co (n N N C) N C) O) C) Cn N C) Cn N Cn • OZ EN CO CO CO CO CO CO CO cO c0 co CO CO CO (O CO O co CO CO (O CD O CO (D CC CO O 4 4 V V V V V V V V V V V V V V V V V V V V V V V V V co ..i N 000 00000 00000 00000 00000 O O O O a 7 S N Co 0 CD CD CD CD CD CD CD N W CD Co CC W V V V V -C V V V V V V V • • S O 0 Cn N C1 j A A A W W NJ N > O O CO O O CD O CO CO CO CO CO (O c0 (D C. C) V O) A CD N > V N V N W > V W O Q) A NJ N W CO A A N (n N CO A O W V N C) O D) Oo W (n W 'Cr, V N CO N V <0 W O N O) CO 0 O) W O W N NJ W COO CoCD O O A Aa) (j Co W C) O V O CO CC CP O A N N C) V C) > C) N A CD O CC O NJ Co NJ W V 0 Cr) N O CO m m K -I 5 CCC) O) CA C) C) a) CC a) a) C) m a) CD O C) C) CA co C) O O) CD co C) CD a) c N D C CD A A A A A A A A A A A A A A A A A A A A A A A A A A A y cA . CD 'Z`. A A W W W W W W W W W W W W W W W W W W CO W W Co W W W it r' .'0 C CO CO O O c0 CO CO CD Co V V C) O C) O cn C) N (n at n N N Cn n C) C) () in 10 Cn 3 C C > CD W 0 A O Cl O N CO C) W > CO CO co C) Cn N N 0 Cn 0 Co � N CP CO CA O C) CO CO CO W COCD CC W N O CO A CO O V V A N O 0 0 0- 0 ' a > OA W O N O iv W O) > A in O A > A A N N N O CD a) D Z �(W N O (n i W A O) A Co O co C) N > 0 CO N V c0 O co M.V a) co O N A C) co Co N A N W > CD CO CO Co O O A CO O Cn V x C a a D) N O O d N _ u 2 2 C� 0 N N C W U CS CT C m D m m c) x Z @ @ O 000 O O O > N N W N N > N > > N W 00000 0000 0 CO O (O D) > N A A V V CD > W A A O W (D Co > Co O) W N W Co N W V1 0V (O > (P N Co O N O) N NJ coc0 O N N a) NJ (n C) (n N W CD A N N )3. O O C c CO co x o C O O m oo, lim DJ N A A A W CO N NJ > > D C) n V A O N C CO CC NJ COCD A > c0 N W N > > Q A (n cO A CO A (O Cn C) CO W N N V A CO A O O Co CO Co CO V V V ...... A O (n A W N A W in "co CD N V > NJ V N CO N W O > *co O A IA ■ O) 03 N Co W O V W CP 0 A Co A O A N V C) 0 V V CO V > N CO 0 03 • • 00 y v * * CO v A W 0 w = m `" o' 3 No ,c 0 0 rt rt% 0 cn `" v V V J 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) (n CT (n (n (T 01 01 0 (n 07 A A A A x •• Cr cr. N O O OO J 0) (n A W N j 000) J 0) in A W C') - 0 (O 00 J 0) W o 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N 0 0 0 0 0 0 0 0 0 0 O O o op 0 0 0 0 0 0 0 0 0 0 O O it 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 bb o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 <7 <7 -0 -0 Z W c 0 0 0 0 o. a. co as o > am 3 o F, m m F, •< 2 N N N N N N N N N W W W Co) W N N N N N N N N N N N N N D N 0) 0) J V CO CO O CO O 0 —' O O (O O CO CO 0 0 V V V CO 0 co 0) N 0) in A 0) -- V 0) CD N V o V -, V W CO 0) V 0 N 0) O) O N N N N co 0 CO V N O) 0 J N 0 0 N -4 N 0) N N N CO N 03 CO N CO -4 O (n D N co o 12. c CO CO CO CO (0 CO CD CO (O (0 (0 (0 CO CO CO CO CO CO CO CO CO CO co CO CO CD co 7 A W W N N W W W W W W W A W A W A W A A N N O (O O . A N 0 CO O) O) V 00 W (4 in N - in N O -- -. O CO -' - O --' O 0 0 0 0 0 0 0 0 — 0 0 C 0) 0) 0) 0) 0) 0) 0) 0) 0) (T (n 0 0 (T (n N (T CZ C. N N A A A A A A a v V m N A A N O (O W V J 0) N A W N — O O (O OD V O in A 0) V 03 COO N A (n 0) CO CO 0 N W A 0) J O) CO -, N3 W A (n 0)N3 CA W N A 0) V O co J 0) !,0 W CO CO N A co co O co A 0) CO 0 O� N -, N 0) -, CO In V CO V CO 00)) V O -+ (D CO A W 0) J W 0) N — () W 0) N A S CO -. 0) 0) 0) O) 0) W 0) 0) (n 0 (n (n N U1 0) (n 01 (n in CO A A A A A A A y CO 0:00) 0) In A 0) N — O (D OD OO J 0) In A W N N - O CO O V 0) (T . (O CO 0 N W A N V W CO N A N0) CO CO 0 N A CO 0) J OO CD co N N W A Q) CO A CO -, O) o W V O N N J CO j N W N -4 CO COCZ 0 V O) CO 0) O) W N 0 O O CO W co (0 N In in (n CO (n W A A T - N N CO CO -4 O) 0) J CO CO A W 01 J W 0) N -+ N co 0) N A 5. CO (I)C C 2 CO N CD 13 �G N 1, 1. - -, j N N W W W A A A A A A p V oilW N <O J A O N V) O N co 0) (O N N W O W W W W (D 0) CO A 0) O Co — O CO W 0) V 07 ivW co O) A -, co N -, N (0 N CO CO CO .0 OO 0) 0) A N O 4) CO 0 CO V 0) COCD ( (.4 CD CD CO (D 0) A J J 0 c m d c 0 00 < 0 O)- J V V W 0) (n (n . (.) 03 _N N -� - O Oco co co co V V W 0) (T ro 7, -c W 0 CA CO A 0 0 0 0) - 0) CO 0) 0 (n -, O) 0) V N -4 W CO W (0 (O C) N; (O b O J N N CO N CO W N -� O c0 CO O N A O) CO NCO (O N N 0) p N W (O N W O V CO A J N - N W - NV 0 -' - W OO N CO N 0D 0) c0 01 O N 0 (2 d CO CO 03 0 A CD N J 0 0) J CO 0) CO V CD 0 0) 0 W 0) (T W A 0) N C F.. n N N N O (p 7 Ut N V) N to cr. N (n V) cr. N V) cr. N co Ut N N N cr. (n cn (n co N U) (n C 3 A "co -co cO c0 (0 (O c0 (O (O c0 (O (O -co "co c0 -co "co c0 c0 (O c0 -co c0 O (O O (D (O C ..9 CD N J V V -4 J V J J V V V -4 V V J V V O O O J J J V J V J O O O O O O V V J 0 S N o O O O O O O O O O O O O O O O O O co -co O W OO OD O7 OD W 00 m OO OO -co M OD O O 00 OO W O OD Co 00 O as " 7 O 7 - N N3 N N N N N W W W W W A A A A (n (n (T 0) 0 0) CO CO () CO O Ct. n CO O N W A 0) CO 0 W Cr, J CO N A C CO N A O) CO CO 0 0 0 CO CO 0 O o 0) 0) W 0) A In OD -, A N 0) O N 0) A N A in 0) V Co c0 O) in c0 co N co co V CO N CO 0 CA A (n N 0 CO 0 (n CO CO J V CO O J CO V 0) 0) CO (T -, 0 0 CO () N J C) 0) W 0 A W CO W A CO -4 CD 0) N J m 3 T T 0) m 0) 0) 41 0) CD W 0) 0) O 0) 0) 0 01 0) W 01 0) 0) 0 0) 0 0) 01 ) CO W c a '-' N ,�,� A A A A A A A A A A A A A A A A A A A A A A A A A A A N cm 0) (n (n N (n N CZ (n A A A A A A A A A A A A A A A A A A g M C CO W W W N N -, a O O (O CO CO CD J V 0) 0) 01 N A W W N N -, CO 01 3 C C -4 W CO A CO (n 0 V) 0 CO 0 CO 0 CO 0 01 0 N 0 0) 0) N -4 N CO W X N N 0 N A 0 N OD N A 0 0) 0) (n A N N N W A 0) CO A 03 N V O N ) 0 j A (n -, CO O A V O . -, (O N A -, 0) O) J N 0) N O -, CO co OD > V W N A 01 0) 0) A CO N CO m N CO A 0 W N V W N (T 0) W D O co N (n N CO CO W A W V 0 CO CD J 0) N 0) A J 0 -, CO J CO (n N CO 0 c) v. v M .Z7 D) C O O O d d p 0 N N O 40 Q (O N (D C z @Cel o0 W 0 — 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0) m 40 N N A V 0 W N A W N 0) V V N N 0 V 0) A O 0) <J W W N N N A N A CD CO N J 0) (D A V CO CD 0 W CO A 0) co O N CO CO CO N-13 O O CO0.1 (C/) 01 Z Z 0 c 5 0 0 O 0 P Ilkli _. _ _ _ _ _ _ _ _ _ x 0 0 0_ CO W V J J 0) 0) N A A W N N - -, O O CO O CO W V J 0) 0) N 0 C) X'1 CO A 0 0) 0 0) 0) 0) (T 0 N 0 0) O) V N J W CD W CD v - 0 0) -. N CO 0 N N N 0 CO co co (D 0 N A v) 0 A J O C. 0) CO 0. N 00)) COCW CD OWO 00)) W OD 0) COCW W 00)) v -, N CO A 0 (An -, (On CO J 0 0 O • co o 0 0 00 S S S T 1 •a °' '•< U0 O N o N co Po 0 13 W CO CO W CO CO 00 CO CO CO J J J V V V J J "... D CS P.) -o 0 moO 'O (O (D (O O J 0) Ut A W N O (0 0) J O) (n cn A -co N 0 W OO 0 V A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N 0 0 0 y V) y N d A CD 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 n N 0 •D 00 N 00 O 000 0 0 O O 0 00000 00000 G W O. O) O. W O O O O O O O O O O O O O O O O O O O L L L -o -0 Z NN N O O O coa 3 3 3 m w s n- c c C a op 3 . S 7W 0 7 CD 0) 00 co co O- O — N N N W W A A A A A A A A N W (D 00 00 A N CO W -. 0) CO -. 00 — O W O O — W V -, -+ A N O 0 CP N CO 00 0 W 0 CO 03 0 0 V 0 N N 0 03 N D N m N e N 3 C 0) au 0 - � -. 0 0 o 0 0 OD CO (O 0 0 0 OD (D CD �5. 0) (n (T co 00 co _ O co co A N 0 CO J CO 0) 0) N (n U 0 J 00 CO N � — N 0) N 00 Ca N ix,J 6) Co in O 0) 0D 0) V J O O O O O O O O O F) 00 0 00 CO CO 00 00 00 O J J V -1 V V V V J V J O) O) a D N (n A A A j N 0 0 00 J a) -co A W N O O -co CO A co O) O N N N N W W CJ AA 0 A co con N co co V co co (11 CO 0 W 0) C N co co A a) co a1 V 00 • 6) A W 0) 00 j CO W in O) a) 6 0 0) J 4) O V A N A (n 0) V p) O A V N CO 0) CO CO 0 (n 0) A (n 0) -E. D CU 00 00 00 co 0o 03 CO CO V V J J V J J J J J V 0) a) 0) . Cn CO (p -4). A W W N p (p CD V O) N A W N N) O O OJ 00 V CD V A OJ A A A A CP (n N 0) 0) 0) 0) J J N) J 00 CO W A W 00 O N A 0) (D A V - 0 CO W 07 N N V 00 N V N in (D A N — W in 0) A 0) j A A A A in -, 0 N N T N A (n 0) J N O A -. V N) CO 0) CD CO (D (n O) A co O) 0) CO C C Z 03 0 - O COO .OP 00) CO 03 -a W 0 O A CD A v A *. 0 (ND 00)) W a N) W 00 N (O A D) J 0) O A A (O 0 6) a) 00 A -+ A a) 0 J N J No CD 0 -. V J 0) N A V A 0 W O) 0) 00 C m m c o p c o N N N N N N N N N N N N N N N -, — -+ -, -, - Q A = A D N N N N N N N — — -.) O 0 O O 0 0 'co 0 -Co 0o 00 r, .< x eD (AD 0 co (n (n A W N3 O CO 0) A -‘ (O V A N CD V A W N 0 0) (D () N O co N O 0) co N N O V A O 0 N CO A 0 V A J V 11 W O O) V 0a (n 4) (n N 0) A (n A N N •— v N A N A n N N 7 N v J V N N cm co (D N N 0 0 0 0 J V N) 0 N 0 CO 0 C (D a 0. Y) O •N N z O N a) N O) at co a) 0) N p) co co N 6) co (n 0) U) p) 0 N N 0) O 3 W21 OJ (p (D 0 0 0 0 0 UO (D 0 0 0 0 0 0 0 CD (D (0 (0 (DZ. J V J J V J J V V V J V V V J V V J J V V J 0e0i (D 0 O O O 000 00000 0 0 0 0 0 O O O O O ? S W W W W A A (Jn 0) V J CO CO (CD CD 0 0 0 0 - -03 _ W OO CO O C) O () O 0 V) V -+ co J A � CO A 0 W V � A a) 0 O W (n (p 0) 0) (D A 0) V — W Ca 0 -) W 'co a W W a — ( W a) OO 0o O) (D 0) A J J 0 0) V CD CD 0) A V CO V 4, W CO CD W 0)CD J (n W 0 V 0) N 0) CO V CO V A N m m K 0) a) a) 0) 0) 0) Oa) a) O 0) a) a) a) 0) 0) a) 0) 0) 0) 0) a) C 0) 0 ] C W (D (D A A A A • A A A A A A A A A A A A A A A A A A 0 O `< `< — N N V1 N 0 N 6) U a) N N p) N N V) N N 6) O) CD N (n eVY' A C CO CO Cr J V J V J 0) 0) W 0) (n (n (n � A A A A O N 3 0 c O co (D coJ00 0) A N O 00 a) 0) co 0) A CO (T -+ co p) O) O) U A -. 0 A O a) J W O 0) O 0 1 0 S S 0 N 0 W in -3 (O O) J N 00 N N) O 0D J (n -. 6) V (D a) D C CO N 0 a) ca 0 0) CO 0 A 0 0 W A J J 0 V 0 V on V V a) o W V CO V V (D CO W CO 0) A O) N W 0 N N A- C X X D) N Na O D) O D 0 N N 0 v CT w (pD (D (T. o - z @ @O (0 CO — O 0 O O -, O 0 0 0 0 0 0 0 0 N W 0 0) 0) OD V O W J in 'CO N 0 V N A N N N 00 J O (0 A 0 0 A A N A 0D A A CO 0 A 0 0 V J (n A W OD N — N N - o 0 (6 x x ( o c z z o co T] A -, N N N N N N N N N N N N N N N —. -. —, -. —3 -• n 0 0 co N N N N N N N — — -, O O 0 O Co 0 (O Co Co w 00 0 0 lin ®1 C m U o A A N 0 O 0) A 0 V A N CO V A W N) CD 0) V N (0 W A CO N -+ CO N O O) N CO A [D V A J V N Q U 0 N O) N 00 0D N J O OJ :-.> p) W — 0) — N W v 0) O) N a) CD (J 0 V O) (n N A 03 A 0 (D 6) 0) W CO CO N IS • • • 0 O * * a 71 o N Z N W u3 cr N W 3 co 5 mi 0 > > 3 N . cr (0 (O (O (O (0 0 t0 (O (0 (0 0 0 (O CO (O (0 (0 (O O (O (0 (0 (O cD 0 W 0 "¢ C cO Co N N V O) Co 0) N N N CD A A A W W W W N N IN -, -, -.D O'O O N A -, 03 0 N) (0 0) W 0 V A CO O) W 0 J A CO Cr. N) 0 (O0 0) N N 0 U) O) V A A N U) A V Cr. N A co N N 0 A A co co U) y A y Ut A V W CO N (O (0 W O Co A C.) -, (O O O Co C.) N N O N -, c0 cP O co co co O V7 A V Co N 0) Co Co A CO N O O O a 0a 0) L L ,-- 17 -0 Z N N O O O W O. c 3 m co "j3) 0 m D 3 S 7 c F co (0 13)"' () 0) 0o N V N W 0) N U) 0) A A A A W W N N NJ -' -, -, -, -, D N IO O) N V A (O 0 W co W O v N 0) A (O N N A N 0 C) V O O N N Cr. W O 0) O) N J O N U) A co U) Co N N W 0) A - 0) V A Co (O U) 0 (0 A W N N 0) CO Cu A U) (n W ICI .." 3 _W Ca W W W W W W W W � W W W W W W W W W 0 0 0 0 O 0 0 0 - N N N W W W A U) - � W U) = A N co A co co co co V V N V) W N Cr. O v V CO co V] O) O) Co 0) O) N U) O O Cr) ' Co A O 0o co Co A A -, A 0) OO N Co Co W Ut N A V N A CO A (0 0 A 0 CO 0 U) 0 0 CO N 0 N) U) C (0 co OJ (O (0 o 0 CO CO Co CO CO CO CO 0o CO CO CO CO CO CO Co Co CO Co 3 0 O O O O O O O (0 Co (O Co (O W 00 CD 0o J N N --4 -c) O) O) O) U) 0) co U) A W IV 0 CO V U)WCO O) U) N CO V A CO U) W ON W (0 N (P A N W A 0 N O v O) co 0) A O) Co c0 O _ Ni N -+ W O (O N Co N 0) O 0) CO Cn -' CO O) W co A 00 CO U) N (O O) N W - V A N J A Co 00 0 N - N N CO CO A (D V Co C X m Co Co Co Co Co CO CO Co Co CO CO CO CO CO Co CO CO CO CO CO Co Co CO m N C1O (0 (O (O CO (0 (0 (0 c0 0o 0) N CO N N V N N 0) W 0) U) (T Co co y co co a) W V 0) U) W N 0 Co 0) A N CO CO (n W 0 V A (0 co co O N A (O W ( N N CO N A A 03 W V 0) O V j V 0 O N W N (O 0) Co N (n A U) A co A O) 41 (O (0 (O O) j A N O) N W O T (O 0) N W N A J N A CD A OD 0 N N N O) ao A O N Co 7 Co (n C c CO 0V N A N _ c0 co N co A N -. 1) N (.J 4 W V Co (13 (O O O X (O Cu (0 W J V A N A 03 W N O) CO CO N N N O N W V CD O A O A U) (0 Co -+ W V Co A (O O •W W co O) 0D -, A 0) ? O) N 0) (O (0 N A A N (O 0) CO CO (O U) 0 W N A CO N (O (O W V (O - 0 c m co c a p G o (n c z A O 0 N N N N N N N N N N N N N N N N N N N N N N N N x O' W CD O O O O -' -' -, -' -' N N N N N N N N N N N N N N N p r7) W ED C) co W CO Co 0 W U) V (O ON W A U) 0) 0) V V V V V N 0) 0) N C) CD W 8$ co co co O CO 00 -' N.) N O) co O) J W -' Co N m V V U) v W DI cp ON N D) N co W A A *CO 0)0) 0 O O N O Co W N W W (O Co U) ('f 3 U) 0) La 0 CO 0 V V J 0 0 W N V O) CO A N A co W U) O c0 C �; d C)) 1D N e+ RO (p coo co N co U) U) N Ut U) U) U) U) U) U) N N U) co N Cr. U) U) U) U) N Z N ( O(0 (O (O (D (D (0 (O (O 0 U1 (O (O O (O (O (O (O (O (O O (O (O 10 -0 '''''CCD N V N N V V V V V N V V V V V V V V N V V N V V V V S N O O O O O O O O O O O O O O O O O O O O O O O O O (O (O (O c0 (0 (O (O 00 CD 00 0o 03 CO O) N N N V N N V V '"' 7 0 7 A NJ 0 00 N U) A N O (O V U) A co N) 0 (O CO V Q) N A A W c0 a n O N 0) O co N co O N O (n (0 A A O J N A A N 0) 0 W (O !D (O O -' - (O U) Co 0) A (0 O) N (O N 0o D) N U) N A N U) 0) W A (O U) CO 0) O) (O CO A CO (0 0 N U) N U) A (T 0) W V 0) A U) N 0) 0) CO co U) 0) A 0 A Co N W A W W CO V - N 03 00 0) M K -I T 0) 0 coo moo 0) 0 0) W 0) 0) 0 0) 0) W 0 0) 01 W 0 0) o) O) C N c m m m A A A A A A A A A A A A A A A A A A A A A A A A A co ••• K 3 m '< '< N co N co co co N Ut U) V) U) U) U) N N N U) U) N 0 U) 0 N U) N x 7 A C CO 0 f N U N O) m W O) O) N V J N N N N do 0) CD 00 OD W CO (0 OD CO c0 U) 3 N C 0 W U) V 0 N) A V (O CO A O) N CO CO 0 N N N -. O X (0 � A W CO O A 43 N W A W CO N W CO O) A a) O -• <O m N W . 0 O 0) ? NO NO)-, O) 0 -+ A (O O) (0 U) O N 'co 0) N U) U) co D C (0 0 f W N 0) W O co O U) - 0o N (O 03 N Co O) 0 W 0 V A O V N V W A W 01 A N W CO 4) A (0 O V W 0) 0) U) A V co N V N �_ J 7J X Dom) E O N O 0) 0) O 0 0 N N O m 0 Cr Cr co Z C ) (0 C1 W _, _, _, _, _, _, _, _s x @@ OO N (O A A A 0) W N N 0) A N co N co co N) A N N - co - O0 ivCO 0) 00 ( O N O U) O) A -' N coO coW -, A N N U) N O 0) N W W O O O) 0D co Co co N c0 CO V V CO CD O O U) N U) V N A O A W A O O a C C La U4 x o Z Z O S5 00 ZE P 0 70 70 -, a N N N) N N N N N N N N N N N N N N N N N N N N N A' n 0 0 I. Co (O O O O O -, -' -, -, -' N N N N N N N N N N N N N N N 0 (7 C Co 0 W U) J 0 N A 0) CO 0 N W A N 0) 0) V V V V V V N 0) v v 'r V co N A CO W CO CO OD Co A O A Cr. N N Co0o CO Co N W O co fl- -. O -' 0) - co N Co co N O N N c0 J W -, N -' (O OD O to O <0 N is 0) N W N CO 0) W A (O Cr. O N V 0) CO A N 43 0 0 (0 0) U) • • co WCD O * * CA 'O n ..... C co N N p 0 '< m _ m . 3 o ,c 3 3 o 00 a0 co 3 �? cno o O O OQCDQQ O o o O O P0009 O (O CD CD CO CO CO O Co (T in N N A A N W W N Ni Ni — — — -. O O O (O (o CD W OD Co CO CV CO 0) CO O V A CD A OD CD Ni CD O) CO CD V A -. CO CD Ni CD 0) W CD 0) N co N so co N Cn CD co 0) co N N N co co co N N co co 0) 0) A N V it .C.3 Ni W G) -4 W A V - A 0) Ni — Ni W A (.) 4) Ni co A co O O Cn V (O A Co O) coOD coW 0) 0) A COW COW CD G) CD 0 A W CO 0) -, A CO -4 CD L L- C_. -0 -0 Z W C O 0 0 0 , D. co co 0 13 0 > m e F a co 0 " p D. '< 0 0) CD CO CD CO CD CO CO CO CD Co CD CD CO CD CO CD CD CDD CO CD CD CO OD CO OD m CO O CD O CO CD CO CO N -, W V CD -s. O DO -. W A W CO A O 0) D W O O) N b N -, O (A V 0) Co in CO -, N Ni V -, V CD Ni CO 0) CO CO CD CD W Ni CD CD CD -4 CO W V CO -, Ni O W CD CD A 0) N co `o Si 3CY N N N Ni N Ni Ni Ni Ni Ni Ni N Ni Ni Ni Ni Ni CO CO CO CO j W CO CO CO CO w A CD CO Cn 0) 0) 0) V V V V 0) OD CO CO CO CD O CD CD CD — N3 N) v -I N V CO A 4) Co O 0) V O N co V CD N N 0) CO W O) A CO W CO Co W V Ni CW CD V W -, V A O iD O O O N A A W V A in CO co O) V V A A -s A CO -, CO CA O OD — V V O N CD Ni CD Ni -, 0) V N CD CO Co CO CD CD CD CD CD CO CO m CD CD CO CD CD CD CD CO (o CD CD CD CO CD (D a O 0 o O o 0 0 o O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CT Cn co v. CD Cn CD 0) 01 CO Cn CT CO CO CD_ 01 Cn N CO Cn CO 0) 0) 0) 0) 0) Ni ) - - — O O O O O O N N A 0) co O so V 0) O O OD in CD V O W Co Co 0) V O A OD -. V Ni O Ni Ni N O cD — W CO V co CD 0) V CO CO CO CD V CT A. CD A CD CD CD A OD -+ 0 N CO CD CD CO S 0 .. CO CO CO CO CO CO CO O CO OCOCOCOCOCOCOCOCD COCD COCD COOD CO COCD COCD CO COCD CO COCD C .. Cn CQ CO Co (D cO -co cO c0 O (D Co CD CD CO CO CD 'CD CD CD W -co (D o c0 CO CD CD CO fA CD CD CD m CD CD CD CD CD CD OD CD CD Cu CD CD OD CD 0D CD CD CD CD CO CD CD CD CO N N N N N N N N O N CO W N V CD O N CO co V Coco CD CD W W in Co - O) A A in O Ni CD CO 0) O V O O O Co V CD -, CD T V CA CD CD V CD CO CO CD V CT A CO A CD CT CO A CO 0 C CD CO CD CO _ 7 0) C C z Z CO x O CD 13 A A A A A A A A A A A A A A A A A A CO W CO CO CO Ni Ni Ni Ni CT 0) V CO CO CD 0 CO CD CO V -4 0) CO A CO Ni O CO V Cn CO CD CD A Ni V V CO -, 0) CO O 0 V CO CD A O) N V O) O Cn co N A A CO O) W N CD -I CO U :-.4 Ni 01 -, (.J CD CO V O CO -, O) in cD a) CD V — W N in CD W A Ni A V V CO V Ni V CD W W W CO O 0) Ni CO CD CO 0) CO N C,) O V V 0 'c m m Co o 0 -1 o x < c m S A D xp m Ni CO 0) W W A A A CD CD Cn 0) 0) 0) V V V V W CD CD W CD CD m cO CD 1:D n 7 OMC p CD COD CD CD J V V CO Ni V (Cn CD CAD A CD Ni 0N) CO 0 CO N COV CO V C CO -4 1 A OD C) O OD N A O in O N A O) N -, O) Qu V O V Cn O Co 0) J .) OD (i N 7 A b cD V W Cn W C) CO CO CO N i CD CD CD W V CD CD CD CD CO V CD A C (� n d DC C) N N O N 7 cn co (n co co N Cn 0) N co N N (n 0) N co N N Cn Cn co co N N cn N co Z73 o co o Co CO co c0 CD O Co co O co cO c0 Co CO (O c0 -co CD CD CO CD CD CO (D C p CD co S S N N co W W W W W W W CO N N N N N N j � � ---s s - 0 0 3 0 7 O) co O Ni Ni -sO O W CO V Cn A Ni CD V CT NiW CD 0 0) CO O. 0 -.Cn O) A 0) CO N O V W CO N CO CO W CO 04 V — W W CO N V A CO Cp CO A V N Cn U) (n C..) A (.J O) .CO O V QD — -+ G.) CD A Ni CO A -, Ni ACD Ni co O) Ni co co CD CD CO CD A W A Ni A CO V Ni —' V CD CO W CO CD CO CD A V CO A V Ni A A CD CD Ni A CO V V CD CO CD CO O) W V CD O _ m m _K r O) CO m O) 01 0) 0) 0) 0) O 0) 0 0) C) 0) W CO ] C N N co A A CD A A A A A 0) A A A A A A A A A A A A A A A A O C 0 . O `<'< — A A A A A A A CD co N Cn Cn CD N Cn Cn Cn Cn N co co Cn Cn Cn N N U 't xi C co co D OD OD co co CO O O O O -, — Ni N Ni Ni CO _CO W CO AA A A A 3 (n C G A V CD � CD CD Ni CD CD --s CO O CO 0) CO A CD CD CO CO V CD O A co Cr) CD CD CO N -s O O O CO O CO CO 0) O 0) N V ..... A co A A N -, 0 ? D- CD Cn V N CD O) - O) Ni Ni in A in V A A 0) CD O) Co A. CD (J D C COc. AN CO CD CD N O CO O CO V W A CT A V CO V CD A (O N) C) CO Z O V CD CD O O A O CD C.) CO CD Ni A CD CD V CO CD CO —' O W 0) 0) N .11 Zl COerCO O O 0) 0) 0 Z O e 0 N N 0 0 v CT 00 m D (0 m _ _ Ni - - z nF, (7 O O 0) V O 0) O CO A Co co co A N CO -, A O CO --� V -+ V V 0 0) 0) CD N CO O V (O Ni (o V O N A W O N O CD O O 'co O 'co A W 1.3 CO CO A CO V OD CO Ni 0) 0 C) CO CO V V Ni CD V CO CO Cn V W CJ N N A. 0 0 CO C C Cl) 0 C Z Z o 0 O O0 Nito Ni W W W A A (D N Cn O CD 0) V V V QD (D DD CD W 0 (p 0 30 PM C co co Ni CT co co co co CD CD Ni Cn CO A CD CD A CD CO CD Ni A CD 11111 CJ (n 2 V V) co — o O O CO CD O co CD CD CD V CO O CD CD Ni V Ni CO V CD CO CD A y CO CD O CO in -, 01 W .-.4 m V CO ill .03 V O A O)CO) -4 0) CO 43 Ni CO CD CO — 01 CD CD CO o CD 43 CO 43 V CD CD V CO CD CO Ni CD CO • • • 0 0co * • * 0 c o N co co. _ N 3 O m ma a0 c 0 o m j j -. -. -. -. 00 0 0 0 0 0 0 0 0 0 0 0 So A- W W CJ N N N O O O CO CO CD CD -CO OD 0) J J J O) O) 0) N N W A N A N W W O (J) N N N N (CC O) N O (n (D N 0) (n 0) N Ut (C Co O O OD W A O - co A N W A O) co A N 0) N in W -. N A co a) C V 0) (n V W CD V W N 0) (n N) V V Co (n O J W 0 co L L L -0 -0 Z O O O W 0. 0- W W 0 D afD 3 ^< n� 03 0) fll M. CD W- N N -, 0 0 CD CD CO CD CO CO 0) CO CD CD CO CO CO 0) CD CO co CD CD (D D (n (n O A CO O J N O c0 c0 CD CD N N W O CO Co O Co co O - A (n N CD W J Co - CD A J O) N -, O co A A A CD -. N W co co W A -, 0 J N CO V CO N 0 Cu A W A 0) 0) (a N 0) A D co N. co d o !I. N N N N N N N N N N N N N N N N N N N N N N N N N) N N C J 0) 0) O) (n (n P Cr, A (n (n (n 0) 0) 0) V V V Co CO V n A J a) (n ( A V O W N O co 0) A W CO O W A O A Co (n CO O 7. N O A CD co 0 N N 0) Co A N CD A 0 Co N 0) co - V 7, N N3 -, -, Wb -. -. OV V 03 (n N A 0) W (n 0 co N W CO 0) Cr, V W V N Cr, W 0 co C co co co CD CO CD O CD CO CD CC CO CO CO CC CO CO (O CO CO CO CD CO CO CD CO O co is CO Co (D O O O bb 0p O O O O O O O 0 O O 0 O O 0 O O O O (C V CD 0 N_ N W A A A A A A A A A A (P � (n N (C (n (n W A N J Co (O A O) -I 0 03 co CO J 0 CD O O O O O O CO A A J CD CO OD N) 0 W N A co O A Co V (O cC . CO 0) -+ - (n (W N 0 -+ A 0) CD CO N J V 7, CO A co (n O O N CO -+ O co (n (n C Co 11 Co m co Co Co Co CO Co Co CD Co CO CO CO CO Co CO CO CO CO Co Co Co Co Co Co Coy N0D CD CO CO CO W CD Co O (o (O CD Co (O (o CO (o CO O O O O Co O (o (O (o fn CD OD 0 N) W (n Cr, J V J V V J V V V J Co 06 00 (D 03 co co co Co 03 OD O A 0) Ea W N $D 0 0) V Co cD O <o co W co 0 N N O O -. N J N N3 (n J J 0) O co A 0 N -, CO V N A in J V O V A CO CO GJ -, T N O A 0) O CO N V V CD A W O 0 0 N CO CD O (n N 7 0) C _ C• Z CO Y fn ,.G (J W W CO W W W W W A A 4, A A A A A A A AA A A A A A A A A � (n 0) 0) J03 co 0 N N Ea W N N N) W A 73 V CoD A 0 W A D N CCD 0) CD -' CO O 7, W 7, O -, 0) W W (n CD O) Co (n O (O - in Co -, N in 0 co (n A V W N A N - 0) 0 N N 0) 1D a) N - J -, 0) N) N A CO 0 O A J 0) CO W Co W 0) J 0) (0 A N (n Co 0 cc m mo c o 3p o N (C (I) N 0) 0) a) a) J V -4 CO CO O CD 00 CO CD O O O - -. N N a < CD 0) N A 0) co W -4 CD N) (n Co A. 0 tW CO CO N A J 0 W 0) CD N Cr, N n CD CD N O O N A co CC N N J N A W N O Cr, O Cr, c0 (0 CO CD aD 0) W CD A CD i b A - 0) W V A 0D N 0D (n W (n � N W V CO CO J V 03 A W in -4 n N C) C - 0) 0) 0) � A O) 0) 03 W A Co 0) N O W W Co W -` N CO G) 0 C IO (C ID !D d CD CD O) (n (n (n Cr, Cr, (n 03 (n N (n (n (n (n Cr, (n 0) N N CT (n (n (n (n (n CA CA o 3 N CD CO CD CO CO CO O 00 CC CO CO (O 0D CD CO CO CC (O c0 CD CO (O CO O CO CD O - V - - V - - - - V - - - V - - - - - V J_ J - - - - - g P. CD f N N N N N N N N N N N N N N N N N N N - 3 0 0) 0) 0-) 0) V V (.0 CD O N W W A Cr, 01 (n 03 A A A CO CO W A A 0) J CO O. n - N N(n co cD O CO J O O co N O N N c0 A O N A V N Co O co CD N Co 0 Co A O) (n A 4J - O V J N A Co VW W O OD CO O 0 J 0) N A A W W co V cD CO 0) J O W A N 0 (n W (n Co N (D CO A -, 0) N 0 A CO (n CD W A 0) O) J CD 0) - CC V W Co CO 0 0) W N A O M _3 -I X 0) 0) DC 0) O a) a) 01 0) a) 0) 0) 0) 0)A A A O CO 0) W A A A 0) 0) 0) 0) 0) a) CO 0) W C '� CCC ,�`G A A A A A A A A A A A A A A A A A A A A A en A A A A A A A A A A A A A A A A A A A A A A A A A A A g _,-• X c CO CO O O -• N N N N W W W A A A A Ot N (n 0) 0) m V V V V (D 6i 3 CC 0 0) J 0 N (n 0) 0 W (P 03 -. A V 0 CO 0) CC N Cr, Co A J 0 co 0) co X co co -4 co A co co W --4O co V a) (n 0) N co O N O A A A A W -. co c C) O 0) - CD in O A CD N Co A A (D -, 0 - 6 0) CO CD CO O A N N - > O (n 0 03 co W W CO a) A a) 0) W A A 0 m A 0 (n O 0) N) (n co CO co N a) N 0 (D Co A W 0 A CO co N) -, N CO V N N 0 W O co W co DC N 77 73 O) CO O - a ;u O 0 d N O 0 0 Q U C CO N <D 72 Z n N N N N N N _, N N -O O O O J W N N O -, 0 V CI) A -, N p Co -I CD CD O V O (n co(o W A VVWJA -, in m NWAOWWcc co co C 0 CC CD l .4. W -, Co 0) A co co Co N N O O n C C Ca x to Z Z O O C ( O 0 Z O W7:1 7J CO N (C (n (n 0) 0) C) 0) J V V V 03 Co co 00 CO CO O O O O -5 --. -iv -No n n lin ., 0 N 0) V 0 N) A N (n(n 0D 0 0) CO co A -4 O W O N CoW CD (n .4 v OD O N N N O c0 A CD O c0 V a) (n co N P O N N N N A W �I III Q W CO W V J O W in 0) V -+ O (n co O - W V - -` - -, (n N) O Co N il 0) 0 co co O co A 0 A N W 03 A J 7, N W N 0 03 a) W A co V a) -4 • • p _.. n N v rL r2 V) '0 0 Co 0 c co y yN O 3 `G 3 tfl w a 7 0 0 v 6 7 W CO O 7 0 A A N `G y cA .0i 0) NA M O a O W 7 O O Z c0 co CO CO CO CO 00 c 00 m 0 O i W O m u ` O_ O -s CO N CO N A co O --'' S O d O W CO O y N 0O N y 0 0 O 3 000 '06660 6 0O co .'O C a cD 3 0- O N O co 0) W O O 0D S o ? co 3 Cl.) A Nco T O O a 0 `0G N O O N Q) 0 co au co co m m co au O m CM co N rrD 0- "..c.' m 0) -CA -CD CM A A A CO a '_�. • N N N W W v (OO x >• 9Oi N V V C 0A. �' D) V) N �I 00 � W ? W Q7 y � c0 V 07 N A N CO V N co x 5-- ,_. y D _0- CO ' ti..O 0 CO O W u N + co W N Ni v 3.C O y Z OJ W V V �.' W i ? _ CD A A N 0 0 — 0 0 N N O W V O — O CO A r O O _ O COCD V CO0V N V N O N (0 O O O m o x O CO aD co7CD w CO C m y 0) 00 CD CDN N N N N N N y 0) 0) -t A N N N N N N N *' * O 0) ZT V 0) 0) 03 01 01 A W Z CO V CO CD O) O 0) CO y c ut aD Co W O Co V co 3 CO co O co V V N N CO 0 O 13 7 7 7 77 T -1 C) 0 0 d co �. co fD co cD co 3 co T y ID O S d N N 0) N Co c0 e7i Er a a a a a CO m m H > > > > > N N N N N N C C C C 3 CO C CZ 03 x N CD 13 CO LO O m (p co co Q O n M 0 y m w 'et: "2 c m 0) c Z 0 < o n) coJx d < 4 0 m m 7 9 o m n m m 0 o v CO CM d m D m b E = m N C N d 5. 3 0 CD o m n) v m e 0> m m Z 0 3 CD N O N N OZ AI K 0 O O D D LcD N _ V y 0) 0) co a c7) N -s 0 O o) V cn N m m 3 - T T m m c °1 I m m o A A y 4. 3 - 0 ..,< L A A m j PJ c CO W co O f0 N 3 y C C O -` A V CD m i n 7 7 FI0O) Co > z O O c0 0O N N co C O O d co d d N c 0 0O Q CO 0 m D m m 0 CII x Z 0 o 0 com m 0 0 o O W N N n 0 0 CO C O (I) 7•' o 0 O O ZE Oco 0 A A (7 5 .1 0. m c0 Q v CO CO Z 51 12 • • 26187 gr/ate PRINT DISTRIBUTION LIST BAKER Please sign and return one copy of this transmittal form to: HUGHES (mandatory) Petrotechnical Data Center, LR2-1 DATA LOGGED WELL NAME J-10I3 Q/1/2oiS 900 E. Benson Blvd. int. K.BENDER (mandatory) Anchorage,Alaska 99508 FIELD Prudhoe Bay Unit to acknowledge receipt of this data. (mandatory) COUNTY North Slope Borough LOG TYPE RPM-Wireline (mandatory) (mandatory) STATE Alaska BH DISTRICT Alaska (mandatory) (mandatory) LOG DATE: August 13,2015 TODAYS DATE: 29-Aug-15 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: CANIZARES EMAIL: t , (mandatory) '1 HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? No HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? ` COMPANY ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) A B C D L.I.S. FILM PERSON ATTENTION #OF PRINTS #OF PRIN I S#OF COPIES#OF COPIES#OF COPIES#OF COPIES 4 U U U 1 ConocoPhillips Alaska Inc. 1 1 1 1 Attn:Ricky Elgaricio A= J-10B_MRPM_PNC3D_RAW_13AUG2015_BHI.meta ATO 3-344 700 G Street B= *(Folder 1 on cd/dvd) J-IUB_MRPM_PNC3D_RAW_I3AUG2UI5_13H.meta Anchorage,AK 99510 C= **(Folder 2 on cd/dvd) J-IUB_MRPM_PNC3D_RAW_I3AUG2UI5_BH.PDF D= "**(Folder 3 on cd/dvd) J-IUB MRPM PNC3D_RAW_PASSUIDUWN_I3AUG2DI5_BHl.dlis J-IUB MRPM PNC3D RAW PASSU2UP I3AUG2UI5 BHI.dlis ****(Folder 4 on cd/dvd J-IDB_MRPM_PNC3D_RAW_PASSDIDDWN_I3AUG2DI5_BHl.las J-IDB MRPM PNC3D RAW PASSD2LIP_I3AUG2DI5_BHI.Its * Folder 1 on cd/dvd needs to be named"META" ** Folder 2 on cd/dvd needs to be named"PDF" *** Folder 3 on cd/dvd needs to be named "DLIS" **** Folder 4 on cd/dvd needs to be named "LAS" 2 ExxonMobil,Alaska 1 1 1 1 Attn:Lynda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr.Suite 600 Anchorage,AK 99503 3 State of Alaska-AOGCC 1 1 1 1 Attn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 4 DNR-Division of Oil&Gas 0 0 1 1 Attn:Sean Clifton 550 West 7th Avenue,Suite 802 Anchorage,Alaska 99501 TOTALS FOR THIS PAGE: #REF! #REF! #REF! #REF! #REF! #REF! TOTALS FOR ALL PAGES: #REF! #REF! #REF! #REF! #REF! #REF! P� OF//r,� THE • Al andGas �w \\\�/%sA STATE Alaska oft\LAsKA Conservation Commission t. = 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Nr-44.716,- Main: 907.279.1433 ALAS5 Fax: 907.276.7542 www.aogcc.alaska.gov John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU J-10B BP Exploration (Alaska), Inc. Permit No: 215-112 Surface Location: 550' FNL, 804' FEL, SEC. 09, T11N, R13E, UM Bottomhole Location: 138' FNL, 156' FEL, SEC. 09, T11N, R13E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, alb./ Cathy . Foerster � -- Chair DATED this I day of July, 2015. STATE OF ALASKA ALA OIL AND GAS CONSERVATION COMNvON R EGIV ED PERMIT TO DRILL MA ?(W:20 AAC 25.005 1a.Type of work: 1b.Proposed Well Class:•® Development Oil 0 Service-Wini - ®Single Zone 1c. Specify if well is proposed for: 0 Drill ❑ Lateral 0 Stratigraphic Test 0 Development Gas 0 Service-Supply ❑Multiple Zone 0 Coalbed Gas 0 Gas Hydrates ® Redrill 0 Reentry 0 Exploratory 0 Service-WAG 0 Service-Disp 0 Geothermal 0 Shale Gas 2.Operator Name: 5. Bond -®Blanket 0 Single Well 11.Well Name and Number BP Exploration (Alaska) Inc. Bond No - 6194193 PBU J-10B 3. Address 6. Proposed Depth: _ 12. Field/Pool(s) P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 11215' ' TVD 8900'ss Prudhoe Bay/Prudhoe Bay . 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): Surface: ADL 028281 • 550' FNL, 804' FEL, Sec. 09,T11N, R13E, UM • Top of Productive Horizon: 8. Land Use Permit: 13.Approximate Spud Date: 693' FNL, 1498' FWL, Sec. 10,T11N, R13E, UM August 15,2015 Total Depth 9.Acres in Property: 14.Distance to Nearest Property: 138' FNL, 156' FEL, Sec. 09, T11N, R13E, UM 2560 14900' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 69.2' - feet 15.Distance to Nearest Well Open Surface: x 643543- y-5970804 - Zone- ASP4 GL Elevation above MSL: 40.07' - feet to Same Pool: 600' 16.Deviated Wells: Kickoff Depth: 8975' feet . 17. Maximum Anticipated Pressures in psig(see 20 AAC 25.035) _ Maximum Hole Angle: 123 degrees - Downhole: 3300 • Surface: 2460 - 18. Casing Program Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 4-1/4" 3-1/2"x 3-1/4" 9.3#/6.6# L-80 STL/ 2914' 8301' 7755'ss 11215' 8900'ss 203 sx Class'G' TCII 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth TVD(ft): Junk(measured) 10665' 9033' 10250' 10250' 9020' None Casing Length Size Cement Volume MD TVD Conductor/Structural 80' 20" 8 cu yds Concrete 30'- 110' 30'- 110' Surface 2652' 13-3/8" 3720 cu ft Arctic Set II 30'-2682' 30'-2682' Intermediate 8787' 9-5/8" 1192 cu ft Class'G', 130 cu ft Arctic Set I 27'-8814' 27'-8325' Production Liner 1045' 7" 429 cu ft Class'G' _ 8286'-9331' 7810'-8835' Liner 2395' 3-1/2"x 3-3/16"x 2-7/8".95 cu ft Class'G' 8270'- 10665' 7794'-9033' Perforation Depth MD(ft): 9654'- 10585' Perforation Depth TVD(ft): 9025'-9027' 20.Attachments: El Property Plat ® BOP Sketch ® Drilling Program ❑Time vs Depth Plot ❑Shallow Hazard Analysis 0 Diverter Sketch 0 Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date 22. I hereby certify that the foregoing is true and correct: Contact Ryan Ciolkosz, 564-5977 Printed Name Joh Al 1Title Engineering Team Leader Email Ryan.Ciolkosz@bp.com '/ Signatur= NV - Phone 564-4711 Date 4/205---- Commission Use Only Permit Ti Drill , / API Number: Permit Approval t See cover letter for Number: ,,C ��7/G 50-029-20444-02-00 1 �� other requirements: Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas D contained shales: Other: 30 P fC54 fp 35-60 P 51' ,Samples Req'd ❑ E Yes 'No Mud Log Req'd: ❑Yes 1:21 No .f}--71-t�lar prove, '3 ' ftSf -Ft) ZSUtD51 12 HZS Measures: EQ Yes ❑ No Directional Survey Req'd: Er Yes ❑ No Spacing exception req'd: El Yes ❑ No inclination-only svy Req'd: ❑Yes © No APPROVED BY( ,-)0.4...-,,01-1,----- APPROVED BY 7 /3 !/. ----- Form COMMISSIONER oA ,A C DateForm 10-401 Revised 10/ 012 This ermit is valid for 24 monthsOniia o TAT AAC 25.005(g)) Submit Form and Atta �ems In Duplicate V`7"'L q//o// ���,�- 6`.3`t / w • • To: Alaska Oil &Gas Conservation Commission From: Ryan Ciolkosz Rig: Nordic 2 0 bp CTD Engineer Target Reservoir: Ivishak Zone 2/1 Date: June 25, 2015 Re: J-10B Permit to Drill Request History and current status: J-10A, was completed in 11/02 as a HAW with perfs in lower Z2A. In 9/05 the deepest set of perforations (240')was isolated with a CIBP. The remaining Z2A perfs (90') did not cycle well, resulting in minimal on-time. In May 2013, end of life heel perfs were added in Z2B. Although oil production increased, the gas rate made the well uncompetitive. The well has had less than 10% on time in the last 12 months. The last two POP attempts, resulted in the well coming online above marginals. No remaining value was debited from the new sidetrack value. Proposed plan: Drill a through tubing sidetrack with the Nordic 2 Coiled Tubing Drilling rig on or around August 15, 2015. E-line will cut the 3-1/2" liner above the TOC and Nordic 2 will lay down the cut liner. The J-10B sidetrack will exit through the existing 7" liner. Kick-off will occur in the Shublik and target Zone 1 B/2A reserves. The proposed sidetrack is a -2,240 horizontal Ivishak Zone 1 B/2A producer which will access targets North west of G-Pad. The lateral will be completed with a 3-1/2" x 3-1/4" L-80 liner which will be cemented and perforated. CTD Drill and Complete J-10B program: Rig Start Date: August 15st, 2015 Pre-Rig Work(scheduled to begin June 17th, 2015) 1. E Seta 3-3/16" CIBP at 9,396' MD. 2. F Pressure test CIBP to 2500 psi for 30 min 3. E Run Gyro w/GR from top of CIBP to surface 3. E Chem cut 3-1/2" Liner at 8,997' MD 4. C Latch into 3-1/2" Liner deployment sleeve & confirm liner pulls free 2. V PT MV, SV, WV. 3. V Set TWC pre rig. Only Required if CIBP does not pass to 2500 psi Remove wellhouse and level pad. Bleed wellhead, production, flow, and GL 4. 0 lines down to zero and blind flange Rig Work: 1. MIRU and test BOPE to 250 psi low and 3,500 psi high. 2. RU 4" GS Spear and Retrieve 725' of 3-1/2" liner 3. RIH with clean out BHA and cleanout wellbore from WLEG to liner cut 4. RIH and set 4-1/2" x 7' whipstock Top at 8,975' MD 5. Mill 3.80"window plus 10' of rathole. Swap the well to 8.5-9.5 ppg PowerPro. 6. PU drilling BHA with GR/Resistivity 7. Drill 4.25" hole to TD at-11,215' MD 8. Run 3-1/2" x 3-1/4" L-80 liner leaving TOL at-8,301' MD. 9. Pump primary cement bringing TOC to TOL, 42 bbls of 15.8 ppg liner cmt planned* 10. Cleanout liner and run RPM/GR/CCL log. 11. Test liner lap to 2,400 psi. 12. Perforate liner per asset instructions (-700') 13. Freeze protect well, set TWC, RDMO Post Rig: 1. V: Pull TWC, tree work as necessary. 2. S: LTP if necessary.* 3. C: CTU N2 lift to KO well. (Contingent RPM log and perforating if Zone 2 option is drilled). 4. T: ASRC NWKO if perforate >500'. *Approved alternate plug placement per 20 AAC 25.112(i) Mud Program: • • • Well kill: 8.4-8.6 ppg brine. • Milling/drilling: 8.6-9.5 ppg Power Pro for milling window and drilling (457-846 psi over-balance ).--.- Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • • All Class I wastes will go to Pad 3 for disposal. Hole size: 4.25" Liner Program: • 3-1/2", 9.3#, L-80, STL Solid Liner 8,301' MD— 8,945' MD • 3-1/4", 6.6#, L-80, TCII Solid Liner 8,945 MD— 11,215' MD • • A minimum of 42 bbls of 15.8 ppg cement will be used for liner cementing. (TOC 8,301' MD) • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional • See attached directional plan. Maximum planned hole angle is 123°. • Magnetic and inclination surveys will be taken every 30 ft. • Distance to nearest property— 14,900 to the North. • Distance to nearest well within pool —600' Logging • MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section. • Cased hole GR/CCL/RPM logs will be run. Perforating: • SWS 2", 6 spf, perf guns, 1-1/4" CSH work string, & 2-1/16" CSH • The primary barrier for this operation: a minimum EMW of 8.4 ppg. An EMW of 8.4 ppg for this well will provide 372 psi over-balance to the reservoir. - • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Anti-Collision Failures • J-25 fails Anti-Collison with J-10B's wellpath from: • 10,125' — 11,215' MD on J-10B's Wellpath • 10,275' -11,525' MD on J-25's Wellpath. • J-25 was abandoned below 8,960' MD with a CIBP(08/06/04), a 71' 3-1/2" liner lap was run above the CIBP and cemented to the top of liner and a Liner top packer was installed on top of the 3-1/2" liner. Hazards • J-pad is not an H2S pad • Medium Risk of lost circulation with one planned fault crossing - Reservoir Pressure f • The reservoir pressure on J-10B is expected to be 3,300 psi at 8407' TVD. (7.55 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft)to surface is 2,460 psi. • An EMW of 8.4 ppg for this well will provide 372 psi over-balance to the reservoir. Ryan Ciolkosz CC: Well File CTD Engineer Joseph Lastufka TREE= 6"CAMERON ACTUATOR FTfi OTIS - O Proposed SAF TOTES.WELL ANGLE>—70'@ 9564'. MAX DLS:36.5°@ 9627'. OKB.ELEV= 69.2' BF.ELEV= 41.8' , , KOP= 3200' 2035' —I 7"ons RPB SSSV NIP WI INSERT,D=3.813" Max Angle= 96°@ 9659' Datum M30= 9366' — — 2607' H9-5/8"DV Datum TVD= 8800'SS 13-3/8"CSG,72#,L-80 BTRS,D=12.347" —I 2682' ,• 1•1 14 f' 1A 1 8188' —TOP OF FBR 1 /1 7'TBG,26#,1-80,.0383 bpf,D=6.276" — 8212' 1 rA/ 0 ►.t 8212' —r X 4-1/2°GUBERSON POLAR i PKR SQUEEZED 05/26/94 Minimum ID =2.372" @ 9401' �� TOP OF 2-7/8" LINER -' 8254' —4-1/2"HES X NP,D=3.813" i►% ���e__ 8285' —4-1/2'XN NIP,MILLED TO ID=3.80" 041 ;A (BEHIND CT LNR) TOP OF 7"LNR 8286' k 40P laPal t, 8316' 4-1/2 GUBERSON SI-EAROUT SW 3.70"BKR DEPLOY SLV,ID = 3.00"@ 8301'MDR* �(BEfHINDCTLNR) 31/2"XN]P,ID=2.813"@ 8301'MD ; .I + 8316-8335 —CMT SHEATH F!'94 PKR CMT JOB, til ;/ MLLE)TO 3.80"(BB-WD CT LNR) 4-1/2"TBG,12.6#,L-80,.0152 bpf,D 3.958- H 8316' •` iii ��•�1O 3-1/293If STL L-80" 9-518"CSG,47#,L-80 BTRS,D=8.681" —{ 8814' 3-1/2'5[3-1/4"X0 @ 8945 RA TAG @ 9840' 4-1/2"x 7"Bakerwhiostock @ 8975'MD 4e1 7"LNR 29#@ 9326'M D 3-1/l"Tubing Cut@ 8,995' / iii. —, 3-3/16"CIBP @ 9396' 3-1/4"6.6#STL L-80 @ 11,215' MLL OUT WINDOW 9330'-9338' ,,,,it. NONN 9244' —3-1/2'X3-3/16-)6),ID=2.800" I IIMONAM 3-3/16"TBG,6.2#,L-80 MIL —{ 9401' OO , I 3-1/2"TBG,8.81#,L-80 STL,.0087 bpf,D=2.992" H 9244* .0076 bpf,D=2.80" I PERFORATION SUMMARY REF LOG:MWD ON 09/15/02 ANGLE AT TOP PERF:95°@ 9925' 9401' —I3-3116"X 2-7/8"XO,D=2.380" Note:Refer to Production DB for historical pert data SIZE SPF" INTERVAL Opn/Sgz i DATE SHOT 2- 6 9654-9684 0 05/24/13I 10250'cm --IBKR CIBP(09/27/05)J 2" 6 9925-9985 0 1 09/30/05 2" 6 10020-10050 0 09/30/05 2' 4 10345-10585 C 09/15/02 10629' — PBTDJ 2-7/8"LNR,6.16"L-80 STL,.0058 bpf,D=2.441" --I 10665' DATE REV BY COMMENTS DATE REV BY COMMENTS IPRUDHOE BAY UNIT 04/13/81 ORIGINAL COMPLETION 05/25/13 JRP/PJC ADPERFS(05/24/13) WELL:J-10B 09/16/02 JDM/KK CTD SIDETRACK 05/28/15 RRC J-10B Sidetrack PERMIT No: `2021760 ('07/15/03 CMO/TLP MAX ANGLE CORRECTION API No:50-029-20444-01 110/08/05 JLG/TLH CIBP SET;ADPERF(09/30/05) SEC.9,T11N,R13E,550'FNL 8 804'FEL 5/1/29/06 CO/DTM TREE CORRECTIONS(6/13/04) 04/19/12 PJC MISC CORRECTIONS T j BP Exploration(Alaska) TREE= 6"CAMERON `�L'�D= FM - J 'I OA SA OTES:WELL ANGLE>—70° 9564'. ACTUATOR= 6"OTIS MAX DLS:36.5 @ 9627'. OKB.ELEV= 692 BF.ELEV= 41.8' 1 KOP=---- 3200' • O 2035' H7"OTIS RPB SSSV NP W/fVSERT,D=3-813" Max Angle= 96°@ 9659' Datum ND= 9366' — 2607' H9-5/8"DV Datum TVD= —88017 SS 13-3/8"CSG,72#,L-80 BTRS,D=12-347" H 2682' ,^1 )� 8188' —I TOP OF PBR IA •t / 7"TBG,26#,L-80,.0383 bpf,D=6.276" --I 8212' i41 •' * C8212' —7"X 4-1l2"GUBERSON POLAR Minimum ID =2.372" @ 9401' PKR SQUI--/BJ 05/26/94 TOP OF 2-7/8" LINER '` 8254' —+4-1/2"HES X NP,D=3.813" rig *t, •A 8270' H4"BKR DEPLOY SLV,D=3-00" 0 • 8280' —13-1/2"HES XN NP,ID=2.750" . + 8285' H4-1/2"XN NIP,MILLED TO D=3.80" 4,4 ow TOP OF 7"LNR --1 8286' tbh (BEHIND CT LNR) 1f I 8316' 4-1/2 GUIBERSON SI-EA ROUT SUB 4-112"TBG,12.6#,L-80,.0152 bpf,ID=3.958" —1 8316' 1(BEHIND CT LNR) 1.11 ���� 8316-8335CMT SHEATH F/'94 FKR CMT JOB, 9-5/8"CSG,47#,L-80 BTRS,ID=8.681" —1 8814' 1 1 MILLED TO 3.80"(BBHIVD CT LNR) 3-1/2"TBG,8.81#,L-80 STL,.0087 bpf,D=2.992" — 9244' 9244' H3-1/2"X 3-3/16"XO,D=2.800" WI-IPSTOCK w/RA TAG @ 9336' —j 9326' / 7"LNR,29#,L-80 BTRS,.0371 bpf,ID=6.184" H —9326' MLL OUT WNDOW 9330'-9338' r .— 94.01' —13-3/16"X 2-7/8"XO,D=2-380" OW 011/11./1 .•.•/•1•0•1•�� 10250'CTM —i BKR COP(09/27/05) 3-3/16"TBG,6.2#,L-80 TCI, —1 9401' .0076 bpf,13=2.80" 10629' —i PBTD — PERFORATION SUMMARY ` REF LOG:MND ON 09/15/02 i4 ANGLE AT TOP PERE:95°@ 9925' Ilk ° Note:Refer to Production DB for historical perf data SIZE SEF IVB JAL Opn/Sqz DATE SHOT 2" 6 9654-9684 0 05!24113 2-7/8"LNR 6.16"L-80 STL,.0058 bpf,D=2.441" —1 10665' 2" 6 9925-9985 0 09/30/05 2" 6 10020-10050 0 09/30/05 2" 4 10345-10585 C 09/15/02 DATE REV BY COM/vE TS DATE REV BY COMMENTS PRUDHOE BAY MUT 04/13/81 ORIGINAL COMPLETION 05/25/13 JRP/PJC ADPERFS(05/24/13) WELL: J-10A 09/16/02 JDM/KK CTD SIDETRACK PERMIT-143:'2021760 07/15/03 CMD/TLP MAX ANGLE CORRECTION API No: 50-029-20444-01 10/08/05 JLG/TLH CDP SET;ADFERF(09/30/05) SEC.9,T11 N,R13E,550'FNL&804'FEL 5/1/29/06 CO/DTM TREE CORRECTIONS(6/13/04) 04/19/12 PJC MSC CORRECTIONS BP Exploration(Alaska) • • ,�mim ._ gwo w2 a= m 0 m Q Ct Q 0 J . Q �a/i 1 I.L (Is a) .v •c E a Z a I— << r. m m •— in 0 'C aO ON a d Q m .0 0 -g � oo = a Z as ; � am co all G A-- U Z CO t0 3 m `WII ern ° m CO o 00 O co O 03 W m O Z 0 0 co h N LL7 CO 3 O O CoQ O r N O^ a • O co U U Z Q N c `o t10 . O 5ce o_ m l0 N a U N a 7 f, a U > Z @ > U N J c 3 Q J 2 N CO .2 . U Y m _ a O CO 3 M C)) 3. O) N d 3C0 NC NN V ' C 52YI- 2w 2D D m ,U Of 3 F. O o J J C Gi > a3 O 3U N iiii .. CD D- 0 O .m C :2 to d J J 0 t u W N C a g 2.) F N m o in S. C CD n io E io - V U C = 3 i o d N o N E > j E ' LL O O O U N m tz T .dr O O O • m ��y..!! — O O > 0 C 7 R In U) C to O 7 3 j O ` N JI- 2 Z 0 0 N 0 O O O pp 0 I` N) Q0 W m a O M 0) CL D- CO 0) tri Q a d o r m - a o 0O E O 0 CL O F W - O CO N >co N 3 y . N Ei W co m CC co t E K ii) L C 0. C 't C O) R y C N O Z coo V) L .�. N Z co ..) ? E o 0 Z m o O Z 5 a U rO Q y N m co w • 0 a 0 a m O m E a E g oo a 75 _ to O m O a m coLL a st N) rn m N Z CO T) 7 3 Ca C7 )y U - N 0 O O O N 5 I` Z Q O O Oo N 0 Q a) ,-co Na,Ocv U m O E 2 Q L C Q O a m Z 0 00 3 (O Z N ' O O ` m O0 m o >, a N N O a a .- '00 =) afn 0 Z W r o O o D Z Q+ + O 2 m Z a a =) =) c c co t tt C O CL W C 4. O ai m O E Y j j m B a 0 C .. i N 3 Cm C C dr i7 Z C T A O a o 0 o co co 00. IA550 0.` 202 v) St i_ a° 3 3 a° 3 CO 0 Q3 > > co O r co O O O O f- r- O f� O U) o D AN N• - N O O CO N: M 0 M !` M .- O O O U coco co N O 0 M N m d `W ("a o 0 ~ 0 0 N N CO co W V' V' co N CO (O CO (0 0- O cocri .- co - co V' I,- CO CO N CO CO CD O O g co 0 V' M O N O O U) V' O N I� CO O ^, O N co M co V' V' V N CO CO CO co C) CO O U LOJ Z v N N N N N N N N N a- a- O O) CO CO_ CO d d i N N N N N N N N N N N N cc N to a 12 0 > 3 A d a_ as O g. f, d co N 0 CO U) 0 0 0 0 0 0 0 0 0 0 0 0 0 Q 0 CO O) O O O O O O O O O O O O O • J C) O ,- O) N N N N N N N N N N N N co t U d c E Yn y 7 _ m J O N 0 3 c 0 O o 2 Y H W C) .--_ N- (A U) CO O V- CO U) CO N N N- O CO N- V' 0 O co M N- 0- N M O N- co co M r N M CO N CO 0 U) N !U (D C) U) N- K) CC) @ O) C) O N N 7 N7 O .E mO co O) C) O) O O O co co co c0 0 n N O C 0-- r N- r r O CO CO N- r N- CO U) U) 7 `V L - a-' U) Ui (() co- U) Ui co- co- U) co- co- co- co- co Ui N d A O CO (D O O CD CO CO CO (D CO CO CO CO (O CO Q W d 0 O p O V q N- fs.C V fd1 0 7 M n co co N 0 CO CO 0 n W <I" N 0 0 C C d U 3 d' co V' W Ln 0 CO CO (n N V• O) N N .- CO Q 2 w A E r CD V' O co N- co (O N V- O) CA N V O w d d () d Oof U) V- M o O V n N V M M N- N L.) 11) T CO V' V' co co co co co co O) co co V O co CO N Ir C3 G m C r N- N- N- N- N- Ns n N CO CO CA CO O 0 ( +K o 0 0 0 0 0 0 0 0 0 0 0 - > n CON- r C) r N- r n n � 0 > 0 Z U) CO u �y7, m m rn rn CO CD 0) rn ') CD 0 rn CA rn CD rn 0 -coo Z xi Ui (D (n Ui (D LO LO LO LO (n (n LO (n 01 ui 0 -C _ C C O C0 u) Q a O M V' U) C) N- CO O) N- CO O) CO V- U) CO Q) f.1 Z' (O O) N co V- 0 U) V' d• V' N CO Cr) U) V' (O N d co O N M V V U1 Cn N- O U) M U) d C2 > N M U) U) U) (D (O (O V' ,- r V' O M CO 0) 0 CO N N N N N N N N N N '- O CD Cr) CO /a la !C �,5- CVN N N N N N N N N N N N .- s W 7 I- 0 0 C C) O V' V' O U) co co N N C) C� CO N CO O 7 CD M N. O O) a- N @ U) 0 V O 0 N- CV(D V' N N) N- r U) N N O N I•` N y d O) O O O co 7 V O CO N 7 O a) E } i i N N N 0 A CD u) y a Z ch 0 O Z i- m 2 U) n CO_ 0- N 0 CO CA O CO U) CD N 0 CO N C) CO CD CO N CD C) 0 CD N- N C) N O V N7 CO N C` U) r ---:Mai N- co N d• V' V' co co M co CO N . CO CO I- CD CA CA 0^ N _ N co V' V V- 0 U) CO I- CO CO CD CA C) C) C) N o co- co- m co co- co co co- co- co- co- ro 3 O w E 0 >, 0) o N N- CO O 0) d• CO CO V' N 0 (0 V' U) N U) U) t V I` 0 M N- U) CA I� CO CO CO COMc6 N O M CO V' N N U) N 0 0 co O d 0 0 O r , -— M co M co M co co co M O m _ a c 3 N ... d Cn p a co Q CV O O Y COO Z CO O CO 7 -. ' N U) n CO co co N- CO 0 CO CO 0 V- 0 O < O () .- -) CO (0 N N- V' U) U) N- c- d• N V' CA CO • O a O CA n N- O O CO N- O C) M U) O N- Q d O (`O') •- N CO V- (O N- CO CD CD CC A O U) C) co o O O $ c0 N C V E m -0, co a_ 1- 7 O T a O ( d CO 0:1t 000O 0 g Z d a E o o o o o 0 v- 0 0 0 00 0 0 0 0 0 0 m 0 Q 0 (7 0 O 7 0 O O O O 0 0 0 0 0 0 0 0 M 0 CO O o a OO Ui U) d O U) O O O 0 0 0 C7 C7 O 0 0 d co d Q CD 0 0 CD 0 0 0 0 0 0 0 0 0 V- CV ed O Zco O) O O N CO d• U) CD N. CO O CT 0 CD O O N 7 co O co- - co- 1 co- co- (A 6i (A Oi Oi Oi O Oi O (D ,-- 5+ .. ~ u. 9 13 2 2 ) F Y W N CO LII 0 CV!E CIN Z in C N O (i O. o33 a U) a -• ® O O O O 00000 0 0 O O O 0 O O O O CO o O 0 O O 0 O o O O O O O O O O O O o -0 1®� 0 00 0 ° 0000 0000 0 0 0000 m m (u `W E ICI - o 4= zCO LCD = ¢ N N CO N V V N CO M CO N CO N C) CO M V C) CLg CO M W N N V N CO N V CO CO V CO QD O O O (OD 0 N M M O) N N V N CO N N N N V CO N (O O �1 f- N N M M M V C) ,0 (O CO N (O N (O CO N- CO 0 G Z I� N- c0 CO (0 V M_ N N _ O O) CO OO N I- (O C0 U) m ¢ a e A as 04I h cc a) N d O N NZ Y N - ¢ O O O O O O O O O O O O O O O O O O O ) 0 O C) O O O O O O O O O O O O O O O O co CN N N N N N N N N N N N N N N N N N Nco E U ' or r - rrr rr rrrr r - - O t N N ) 2) ? S 0 O 2 Y I- W • M O CA N CO CO N V CO O_ O a) co N_ V- 01 M N M N O CO O M CO V O CO O) N O N CO 0) O M CO N CO CO N N i0 CO CO O) CD CO N O CO CO ry O M O O) N CA O N 6 CD N N M CO CO N U O) V a- In CO CO CO N M N OD CO V CO V CO CD O) CD C C C Mel M N a- O CD CO CO N CO CO CO V V M N a a Cd, y- - N t0 6CO CO CO CO V V V V V V V V V V V V V V V V V V V V V V V V <I' V V V V- * V V d W 7 O CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO (O CD CO a) 2 w to O ui 0 c m U A • 'O C V N co co O O V O) N M CO M N V O O 2 Oaw R NO CO O O O O 0) CO N N V M CO CO M r r N O N V O CO M CO N CO N N ca O O CO V O l0 O 41.) Zr, o 0 N O O M O M A O O O N D N CO 0 N N N . NC- QOV C E — coO co N M N- 0) CO CO O N N01010101 MN N Ni N N N N N N N NN 0 N N N N (` N N N N N N N N ..1• > C Z N C O 3 O CO M 0) 0) CD W CA O M Cn W CA CD 0) O O) W W Z ,r; ..6- L6 c6 (n LO- LO- Cri c in LO c0 LO Cri Cri Cri ui v) t O Q N N CA V CO V M O CO N N CD O M V O CO ca O) N V CD N V N .-• V N m N CO CO V CO N V M ee Cc) CO V V M CO Cn 6 O V CO (O CO N N N O O N CO O N N M M M M O V V V O V O V CO CO V O NN N- CD CO V M M N O O CO O) CO N CD CD Ct. a Ca = w I- 0 0 Cl- CDCO V O CO N a- N N CO CO O CO V N (O V N O CO CO CO O N N W M O) CO (O N N CD CO (O CO O M CO R CO O CO CO 00 CD (O N N CO a0 i0 CO N CD O_ �_ r_ N O V tO C) M CO CO M N O N OD C) O O O M M M M V V V V V V co M M V V V V V V N N y 4 Z g O V co co co co co M M M M M M M M 0) CO O V N O O O O O O O O O O O O 0 CO CO O N CO N N N N N N N N N N N N N M O W O co N N N- N N- N N- N N N N N N N N CO O o Ca O) CO Co 0) M 0) 0) W O)00- 0 O CO M O) C) CO O) 0) W 0) Qa CO ao co c0- c0- m ao aCO CO- CO c0 O. CO CO Co ao CO 7 (O CO CA CO CO CO CDD CO CO ON) N. N- CO O CD CO CO CO 07. CO CO CO O) N CO M CD M CO N N CO O O O O O co O co C) CO N O CO V CO CO N CO N- N N N- N N- M M M co N N N N N N N N N N N N N N N N Q CL CO CO OV O O O O 0 O O O C) O O O O CO CO (D O g o CD O O 00000 O C) O O O O .- a O N V O O O O O O O O O O 0 0 0 N CA M C: O CO C) W O) CA O CA CD CO 0) Cn CA O 0) CO O N N O N U — r r r r m O C f o a ¢ o a LL m m t -0 –, 0 0 .0 CO Z d 4. O O N ¢ M O M O O O O O M O O O CO 0 M O O O M d OC f T OV O O O V O O O O O O O O O O O V O O O O O O O V O O O V O O O O co O O a- co a OOO — N M V O CO CO N OD CO CO co O N N .0 7o O O O O O O O O a) O � �7 nco� 0 03 ..) Q U O Ery CA OC JNN 0• O. O 30 . co a cO `W o Co m W CO r O N ^ coco O W V 0 illi M 0 7 CO 0 CO CO O g2 Z _ co C V V VCo 4 Co ✓ V CO CD V V V ,- 4 Co co O co U 0 Z Co Q Z Z Z Z Z Z CO 0 N N N co v. N 0 co 01 N. v CO v CO▪ 4 ~• a Co v w O) O) O O (D O) Ce fi UY T.) _ JO O O O O O Jm O Q r r r r L 0 0 CO 7E co r N m C ct C >, a) .E 2 o o O o 0 0 o O o 0 o 0 0 0 0 0 0 0 0 0 0 > �_ 0 0 0 o O o 0 0 0 0 0 0 0 0 o O o 0 0 0 0 � CO O N- CO 0O0ui Ns ai > 2 Y I-- 2 O CO O O N c7ODN00 O COM N CO n CO CO r- N CO 00 r CO CO CO xx x- CO CO CO N N O) 0I N N N O) V CD 1- N- co- 6 to V V V v 6 to CO O V V Cn 1n co v V V Co CO V V V V V V V V 0 CO V V V V V V C c " V V V Co co CO CO CO CD CD CO CD CD CO V CD CD CD CD CD CD N H Co (O co N CO co CO - h.; 12 u ti c O `1 L w d oi O' 2 Co C 0 0 0 O O O 0 0 O O O O O O O O O 0 O 0 O O O O O O o O O O O O O O O O O o O O O 0 O C V R O O CD O p O O O CD CJ O O (7 O O c0 O N O c0 O O O O N M CO T CO n 0 N 0) C0 N CO a U V c C O) co co N co co co 7 CO 0 W O CO N N O CO N 4 C V C) O N N O - C1 M - O O O E. R c N- ' n N- r- N. N- n r N. N N N- Ns N O yCo w Co U N- n r O) 0) C) CD O) 0) 0) O) O) r- n CD 0) W 0) O) W U W CoTo px r' Co .0 ? CO CO CO CO co- co- Cri vi ui co- Cn 6 c Cn iri Iri (n Cn O V) O 0 0 2 Co z J 2 2 t 0 0.. a) CO CO CO 0) O CO co V CO CD CO (N CO CD CO 0 CO CO 0 V CO CC D) co r CO 0 0 CD V n 0 0 V co O) CO 0 CO V CO V CO . 0) O V O O V M N N W N CO W O V M N. M V C CO COV V N O O CO C)O co O co co co co co e- a E. O) M co N N V O CO N CO •V CO N. M CO N CO m .D W 7 (V - r I— + 0 0 co o CO N _ o N.. CO n N N. 0 0) CO CO 0 _ 0 0 CO CO CD 0 CL M co O V O co .- co C0 Cn N r- N N CO O CO 0 CO CC) M CO W O CO CO W O V CD N. O r CD CO N N LLI O CO Co CO co NV c0 W N CO 0 0 n CD CO O) CO W CO CD O) x- CD N WV � V w x- CD V. O N V co N.- N rOV N - ) M N CO^V e. W x- N Z z Z - Z Z 0 coZ V V O oco O `C? o co O 0 0 0 0 0 0 0 0 0 o '''' O m O O O o 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 o cD o 0 0 0 0 0 0 rn ca n co Oo v o - 6. 0 0 0 0 0 0 0 0 ^ A 0 0 0 0 0 0 0 0 >0 D) N co co - > a) > 1- 3 N > co-N co-> c co-> c 0 0 0 co 0 4 N V r- r O W N W rn m co 0 co 0 co o ❑ 2 0 2 o O ❑ 2 O O 0 2 O ) 2 O CD O O 3 O cCD O 3 N 3 CO O3 0 3 Nco G CV CO M O 0 CO CO co ` N CO CO co N CO d cco CO No O CO co Cr CD CD 0 CO 0 CO 0 CO O 3 0 CO O 7 (0 cv O (n o W O CO 0 CO O N 0 CO J CA O CO co V CO0 O Q CCV Q r CO CO CO CO N 000 CO a a .0 a a a a 0 a r-- -c- G CO o Co d CD CD 0) Co >a L t V o o 0 4) Co Co N N N O 2 m 0) 2' 2' 2' 2' m za a -» ) `m m 1a V. 1 2' ani ani ani (1., N CO V C0 N n CO O) CD nCO Co 0) Co Co 0) Co N CO V Cn CO O Q _ _ V. C N C C C C C C C C C C C)) CO C C C C C C C CO0 E y m E E E E m a° a° a° a° 0 0 n° 0 0 E E 0i CL 0- 0 CL 0 0 _ C c C >. C 0 C .. Z E R CO-O M CO.O N CO O O CO p N N p N cQ p C0 O. U C Co ? t ~ a a ~ a a ~ a a d a a ~a a CD a 0- o) rn'� v1 CO co co co 0 o . . N C.• Os co 3 6. I- co -) - ro s • o CV 03 ce an N cr, ,o ct cocico Z V CO S Vco O 0 Nsr sr g ai O o tO 0 0 Ua z as Q Z Z 'Q 0 m ,r,O IT 0 N- co Z• cc NO v O N cK w N b) ,- a) m 3m Q o b CO -CO y o v to Eu 7 co m = f (O ?` N O O O O O O O O C_ 2 Y I-- 2 IllO o O O O 0) N CO O O O O N O N O V CO VN u-• n N V V co- V to CO co- V V V CVO CVO CVO COVCVO CVO CO CO CV u a c O 2 L Z o 0 0 N C 0 0 0 0 0 0 0 0 N CO N CO dj C o O O O O O O O C A 0 CD Ccti LriCD E v o v hi c -° o CO o CO 0 COm c _ o, 7 C) o CO V 07 CO CO V 2 W u o c m m d (U N CO N- 17 ; n t- N O O m c w Zr, y O % ' I co co co 01 m 0 O U Z N m s CO CO ..6 ai vi L.6C m K L o CO CO 0 0 JO O 7 CO LO N CND CO 0 0 > O 1- 2 Z N CI s, on O Q- o o '.. O E c to O O O. ti co t.0 O O CO co 00 r- 0) N C 0) O CO O co a^- rca ,- CO O. C O' r C) N CO V- ...... M la N M N py. Y1 F O O O L U O o CD V CO CO CO J 0_ o CO O V t•- VI. CO O O (D r N- N- CO tp O O CO lL V CO CO CO V V W0 CO C) V CO V c') G) to O N a O N 0) Z z v m E A o o °ol o 0 0 0 0 0 _ Oi v o x0 0 0 0 0 O a F F CO N N N o v E N. v _ Z O .. m 0 O O C) o 2 o x _ O K O 7 CD O O N OO M 7 O CO ,- CO J J CO o C)) O 0 0 V co 0 O co co m 1 m O N N CO N- m — U CO L O ,0 N O O ¢ O CO 0 7 u C.C: O N CO O N C7 N m LI)Q 7 CO- CO- N V +LQ+ ' N co_LO CO C')) m N 7o .a CD CO _1 N Q CO CO > N >. .0 O O o T N- O O O N m a as N y t0 V CO O N- Q O N > 0 0 � m 0 N CO CO ` L _ • O d. m m W O a- CO N 7 t' 4= N N o 3 m 0 0 0 m Of 2 COO 0 7, O O zo_ o_ , , m V.co m N N. - N CO V CO CO co N N C C C C C C C 49 Q Q E ,N.. E O O O O O O O c a T C C C T 0_ 0_ 0_ 0_ 0_ 0_ 2 C .,- 0 C .. V NO CO N p CO Co. O C H a a. CL fl.0_ m A y .. d 0 m CO C £ N 0a.0330 0 0 h a 11Aig0 m WI UM 6 WI Igo 0 cn JQ 0 0. N 0) a O CO U U Z m Q 0 0 Z Cr ci '2a- O « N -- co "W J m j Q d W L 0 Y co O a) E a, 0 ' (/) m = a _ c E a) 4) T) 2 . p >> 2 Y t- •a w 4) o a 0 d e w CD O 2 0 ci o 0 C▪ a) U G7 _R '8 C t)V E a C N 0 4 t0 w y O m w X U • q) 1 N p o 7 w J P- 2 2 y o t O 0_ a) CC O) m 13 i— o z v coU U) Oo co T COCOCL C CS 3 N N -O n Q rn > a O o a 0 o p O a 0 - F- Y W Lc) co N- co o) - H Q Q Q CO C) d' 0) '!) N- O) O N O N O a1 N a0 O 7 O 7 V V (`� c— N O N V C) C) V O O i,„,.: N. N C) to N CD C) N- O O 7 N N N N N CO CO00 f- CO O 0) (O W 7 N N N N N c- r r r 4) + .... R "El 0 0 U CAO V V U) co CO d' N- CO N O To' V 0) C) N. 0) O CO O CO 0) CO In 0 03 47 J N rn O 7 N O N CO CO V M 0 ,o- 2 2 N 0 m In Ns CO CO 0 CO CO C) CO C) O N r- 0) co O C O O O O O WL (Ni O c{ C) N N.: r N N r N- O U) 2 7 47 CO CO 0) CO N- N- r r 0 JN co co co W co CO co- coco cococo - ¢ j E CO a 0 0 0 0 0 o m co �o co 0 0 N ?) 'a O O O O O M C) M C) CO CO CO Q D a N L O O N. )O 0) O O O O O O In .c - co CO e O O n 0) 0) V V V V V V O O O W O. N 00 CD CD O) O CO 0) O 7) CO O N Z d d y p co- co- m m m of o o O o c c 0 C 0 T m O . d7 C N C �C 0 c a ,1-3• , d O) N N E • Q m N d Nod O av) 33o a 0 to III III go iA - .ti 17---- IQ — i T 1 f �s - w _ - I- —gz —T — k� 1— I • 1 SI — 4 , --- _ --- 1 --------- T F t i f e --- 01 it -4-kg c=, - -I-, joo - I mi= iiirm izrt 3 >0 i m F^ m !fill"?' -__ - - i I I ' -_ I n " _ LT = - - >- ! i I T I �g c • • S t 1 I P 1c m = 91 o �o i o 0 o W &a g o g o ^ 80 I,n O 00 cv $ 3 d - = = (u►/8sn ocz)(+AoN/(-)�11noS j I I 1 F`• i Y � c a +, o I I ?,,: 1,7,;g1 m 3: c6. I —i o = v� x, a d ! i I o • v iso, 1 - 4. j v - 8i _o 0,88885AARAAR i I 28,.., '='...“=”,-, __-- ¢ omgo0N 1 -+-----:----4-----' —g j _ , l • , OQ>—„,-.,---.• o � , , g ' • 'y - ` - 71 p a IN aO to I � I ti -i� �m�S�3� o v<amoo ` [,, o1 5q I I L3 '� g8M288$8.24,E; 1- 1 .2.iii 32a3 AR.A mi rP12 ,^<o ¢ ^ r " mos,r,n$$ -- - ------ — SI N rS Ili "'v$,�S'�rno23.'�om�$ 1 o N ! o �Q�,$$<000� k z'A" 4 smm�mmm Wo ���� mmmmmm I ■ Qo €m ''§88el co,N0oN — F _ .„—„,...„...8. I I m 04$66 m An N 0 . 30 "o,<v,.o lam 2 (uygsn S6)yu.I 1dau 1eo!3 A ac • • 111 V! OIL oliolZ Lila ria 0 I 17 Q Ca IN ■■■ , . Pi— I ■ I ._ � 08 o2Jo� i i =s E ■ 1 � — �. — ■ 00,7E ■ s ILIx ■ ■ j oozy ■ g3I m 0000 �s ` El 1- wsti�m — I 3��� I I ! I ' —.' 0089 = w ir __ i g> mII '� __ _ ■ 1m [1. .. _ _ .1 ' 1 11 _ OOb9 .� -, . , ,0„,„ i_ i ' S 0 .., w ,, 80 0 4 i- .ICr"pr— 1- „ ce 0 3~ -VT ! ■', 000 r-' VD CO - 4 9al v 9 \ "8` oEE _ x y ssovH ; MEI 'g y \0�0\ -r ii oeg _ 3 I III I �^ • III S` o 1 , �,` a OOZS S Phi"' '-�. IF , ,,-,-, _Pilln. \\ S ,cKY EA � t o o \ ,4 J— — _i �m �� . OOSb e3 V a{65 v+ 9 i ,L\O a 3 I: Q } \ \ ilkO09b4 m I 1 Nti 1 bat , 4. 6b OObb i IS• , h •` - -ER V� ► 200 ii `< �� N N 0- 1 //�\\ ortjamm r 1 ti k I a ii::::)1E (ui sn 09)(+)tplo /(-)gnus — — s • W n� L4<mo N illi °,18.`-"A888888888 ci ci Ilhoga §3 Vona -130 > lig Z 9m 3 > > m� AM o ^om o^ m > c F min CO30 a d z .`o- -2, CCI CO F n v n« sp co co &n 'cc' E r Nm > 0 z ,' Y' ] m; w n L+ gq Q Q 00m0 WN Z >a vN 8 14°,4 5 8 9 o m p a _ �o nnn���� 128N a — ? �pp sg m CO m o 0 2 O mm.- Q Q Q t U g@ m N rn rn O M - - p p ENS m " oog Q 4 4 Q = 10.4,1;j 3$ ❑00000mmMmnnm p LL?E n gEgda mmmm8,m 8 mmrn mommmcv � oo m0000.- ' �oWO N2N. ? m .- Z cWNo - _-_.- 0,I U U O 00� _ p r r O O E 0 0 0 z TI5218 ///8 /// / //// \, .\ \ o \ as P 1, & 1�1 it 1 4,1 i // �/i } ..\.\ \. \ rr V4' � \\\\t ` \` \ as Q 28. o O g ,o N O s W . M� I �:Q (OOory r:1 OD. 8 O_. Nr O g ", N. .c.:‘1, 8 N am C N �\ / ! U 13,4 r- 3m . CD 03 / / a \\ ,yam — \ N — r i Qbp North America - ALASKA - BP Prudhoe Bay PB J Pad J-10 500292044400 J-10B J-10B WP07 Travelling Cylinder Report 18 June, 2015 BAKER HUGHES • BP • V I ()bp Travelling Cylinder Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-10 Project: Prudhoe Bay ND Reference: Mean Sea Level Reference Site: PB J Pad MD Reference: Kelly Bushing/Rotary Table @ 69.20usft (NORDIC 1) Site Error: 0.00 usft North Reference: True Reference Well: J-10 Survey Calculation Method: Minimum Curvature Well Error. 0.00 usft Output errors are at 1.00 sigma Reference Wellbore J-10B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: J-10B WP07 Offset ND Reference: Offset Datum Reference J-10B WP07 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200+100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 8,800.00 to 11,215.36usft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,318.62 usft Error Surface: Elliptical Conic Survey Tool Program Date 6/18/2015 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 8,800.00 1 :Sperry-Sun BOSS gyro multi(J-10) BOSS-GYRO Sperry-Sun BOSS gyro multishot 8,800.00 11,215.36 J-10B WP07(J-10B) MWD MWD-Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 2,682.00 2,612.73 13 3/8" 13.375 17.500 8,814.00 8,255.86 9 5/8" 9.625 12.250 11,215.00 8,900.20 3-1/2"X 3-1/4" 3.250 4.500 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB F Pad F-09-F-09C-F-09C 9,485.48 13,250.00 773.59 361.65 512.08 Pass-Major Risk PB J Pad J-01-J-01-J-01 Out of range J-01-J-01 B-J-01 B 11,214.35 10,100.00 988.22 378.99 608.76 Pass-Major Risk J-01-J-018-Plan#7 11,198.07 10,100.00 952.10 379.57 572.13 Pass-Major Risk J-05-J-05-J-05 Out of range J-05-J-05A-J-05A Out of range J-05-J-05APB1-J-05APB1 Out of range J-05-J-05B-J-05B Out of range J-05-J-05C-J-05C Out of range J-05-J-05CL1-J-05CL1 Out of range J-07-J-07-J-07 Out of range J-08-J-08A-J-08A Out of range J-10-J-10-J-10 8,925.00 8,925.00 0.05 0.67 -0.60 FAIL-NOERRORS J-10-J-10A-J-10A 8,925.00 8,925.00 0.05 0.50 -0.43 FAIL-NOERRORS J-13-J-13-J-13 Out of range J-13-J-13A-J-13A Out of range J-16-J-16-J-16 Out of range J-16-J-16A-J-16A Out of range J-16-J-16B-J-16B 9,948.44 11,900.00 586.54 346.13 250.08 Pass-Major Risk J-16-J-16BPB1-J-16BPB1 9,416.15 11,397.00 742.08 336.98 423.77 Pass-Major Risk J-17-J-17-J-17 Out of range J-17-J-17A-J-17A Out of range J-17-J-17B-J-17B Out of range J-17-J-17BPB1-J-17BPB1 Out of range CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 6/18/2015 12:35:34PM Page 2 COMPASS 5000.1 Build 61 • BP • IMMO 0 bp Travelling Cylinder Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Wet J-10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB J Pad MD Reference: Kelly Bushing/Rotary Table @ 69.20usft (NORDIC 1) Site Error: 0.00 usft North Reference: True Reference Well: J-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore J-10B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: J-1 OB WP07 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB J Pad J-17-J-17C-J-17C Out of range J-17-J-17D-J-17D Out of range J-18-J-18-J-18 Out of range J-18-J-18A-J-18A Out of range J-19-J-19-J-19 Out of range J-20-J-20-J-20 Out of range J-20-J-20A-J-20A Out of range J-20-J-20B-J-20B Out of range J-20-J-20C-J-20C Out of range J-20-J-20C-J-20C WP6.0 Out of range J-24-J-24-J-24 Out of range J-24-J-24A-J-24A Out of range J-24-J-24APB1-J-24APB1 Out of range J-24-J-24APB2-J-24APB2 Out of range J-25-J-25-J-25 11,161.25 10,325.00 53.33 14.14 48.34 Pass-Minor 1/10 J-25-J-25A-Plan#6 11,210.03 10,225.00 846.33 374.69 743.23 Pass-Major Risk Offset Design PB F Pad- F-09-F-09C-F-09C Offset Site Error: 0.00 usft Survey Program: 98-GYD-CT-CMS.9498-MWD*IFR*MS-WOCA,10846-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toofface* Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth *WS .EJ-IN Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) n (usft) (usft) (in) (usft) (usft) (usft) 9,375.00 8,792.01 13,550.00 8,981.55 91.80 40.92 74.37 24867 2,967.81 3.875 81064 38160 613.72 Pass-Major Risk 9,375.00 8,792.01 13,575.00 8,981.43 91.80 40.95 75.49 232.97 2,9E7.26 3.875 823.47 377.67 625.17 Pass-Major Risk 9,375.00 8,792.01 13,588.00 8,981.37 91.80 40.97 76.09 224.81 2;997.38 3.875 830.36 375.62 631.21 Pass-Major Risk 9,387.23 8,801.87 13,525.00 8,981.66 91.80 40.93 73.08 264.48 2,948.44 3.875 798.31 380.68 598.59 Pass-Major Risk 9,400.00 8,811.98 13,475.00 8,982.32 91.81 41.01 70.47 298.63 2,911.97 3.875 778.25 37774 569.98 Pass-Major Risk 9,400.00 8,811.98 13,500.00 8,981.79 91.81 40.97 71.72 281.01 2,929.69 3.875 787.35 377.74 582.59 Pass-Major Risk 9,410.75 8,820.33 13,450.00 8,982.97 91.81 41.05 69.04 317.15 2,895.20 3.875 770.96 375.16 557.39 Pass-Major Risk 9,425.00 8,831.18 13,400.00 8,984.25 91.81 41.10 66.18 356.59 2,864.51 3.875 76168 372.40 537.74 Pass-Major Risk 9,425.00 8,831.18 13,425.00 8,983.66 91.81 41.08 67.53 336.50 2,879.38 3.875 765.49 372.37 545.75 Pass-Major Risk 9,43727 8,840.30 13,375.00 8,984.31 91.81 41.12 64.63 377.28 2,850.50 3.875 759.41 370.42 529.06 Pass-Major Risk 9,450.00 8,849.54 13,350.00 8,984.19 91.81 41.13 63.07 398.57 2,837.39 3.875 758.81 368.24 521.73 Pass-Major Risk,CC 9,455.98 8,853.81 13,325.00 8,98422 91.81 41.14 61.62 420.45 2,825.30 3.875 759.99 367.21 51726 Pass-Major Risk 9,465.71 8,860.63 13,300.00 8,984.27 91.81 41.15 60.14 442.91 2,814.32 3.875 763.00 365.44 513.98 Pass-Major Risk 9,475.00 8,867.02 13,275.00 8,984.04 91.81 41.14 58.69 465.76 2,804.19 3.875 767.48 363.70 512.24 Pass-Major Risk 9,485.48 8,874.08 13,25010 8,983.71 91.81 41.14 57.26 489.05 2,795.12 3.875 773.59 36165 512.08 Pass-Major Risk,ES,SF 9,500.00 8,883.58 13,225.00 8,983.39 91.82 41.12 55.83 512.79 2,787.29 3.875 781.51 358.66 51324 Pass-Major Risk 9,505.49 8,687.09 13,200.00 8,982.97 91.82 41.09 54.58 536.90 2,780.72 3.875 791.07 357.56 517.82 Pass-Major Risk 9,515.35 8,893.26 13,175.00 8,982.19 91.82 41.06 53.32 561.28 2,775.22 3.875 802.06 355.88 523.33 Pass-Major Risk 9,525.00 8,899.16 13,150.00 8,981.35 91.82 41.02 52.12 585.88 2,770.87 3.875 81449 35477 53064 Pass-Major Risk 9,534.78 8,904.99 13,125.00 8,980.52 91.82 40.97 51.00 610.66 2,767.67 3.875 828.26 353.59 539.62 Pass-Major Risk 9,544.42 8.910.57 13,100.00 8,980.07 91.82 40.91 49.98 635.56 2,765.62 3.875 843.33 352.38 550.33 Pass-Major Risk 9,550.00 8,913.73 13,075.00 8,980.17 91.83 40.84 49.12 660.55 2,765.01 3.875 859.84 351.72 563.51 Pass-Major Risk 9,563.18 8,920.98 13,050.00 8,980.48 91.83 40.77 48.24 685.54 2,765.54 3.875 877.41 349.90 577.02 Pass-Major Risk 9,575.00 8,92724 13,025.00 8,980.52 91.83 40.68 47.42 710.51 2,766.76 3.875 895.66 348.22 591.63 Pass-Major Risk 9,580.82 8,930.23 13,000.00 8,980.73 91.83 40.59 46.77 735.39 2,769.15 3.875 914.86 347.44 60829 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 6/18/2015 12:35:34PM Page 3 COMPASS 5000.1 Build 61 I BP • Min 0 bp Travelling Cylinder Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB J Pad MD Reference: Kelly Bushing/Rotary Table @ 69.20usft (NORDIC 1) Site Error: 0.00 usft North Reference: True Reference Well: J-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore J-10B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: J-10B WP07 Offset TVD Reference: Offset Datum Offset Design PB F Pad- F-09-F-09C-F-09C Offset Site Error: 0.00 usft Survey Program: 98-GYD-CT-CMS,9498-MWD+IFR+MS-WOCA,10848-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth NNIS •EI-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (ush) 1°) (usft) (usft) (in) lust) (usft) (usft) 9,588.96 8,934.31 12,975.00 8,981.05 91.84 40.48 46.15 760.11 2,772.86 3.875 935.02 346.26 625.87 Pass-Major Risk 9,600.00 8,93965 12,925.00 8,982.53 91.84 40.23 45.23 808.61 2,784.83 3.875 978.20 344.84 665.34 Pass-Major Risk 9,600.00 8,939.65 12,950.00 8,981.63 91.84 40.36 45.57 784.53 2,778.16 3.875 956.21 344.69 644.41 Pass-Major Risk 9,609.60 8,944.12 12,900.00 8,98342 91.84 40.09 44.80 83236 2,792.56 3.875 1,000.75 344.32 685.83 Pass-Major Risk 9,615.09 8,946.61 12,875.00 8,983.82 91.85 39.93 44.45 855.74 2,801.40 3.875 1,023.82 344.04 707.43 Pass-Major Risk 9,619.73 8,948.66 12,850.00 8,983.95 91.85 3977 44.14 878.61 2,811.50 3.875 1,047.42 343.78 729.78 Pass-Major Risk 9,625.00 8,950.94 12,600.00 8,985.21 91.85 37.51 43.55 1,067.77 2,971.07 3.875 1,294.56 341.87 975.32 Pass-Major Risk 9,625,00 8,950.94 12,625.00 8,984.59 91.85 37.77 43.45 1,053.20 2,950.77 3875 1,270.10 342.23 950.44 Pass-Major Risk 9,625.00 8,950.94 12,650.00 8,983.75 91.85 38.03 43.38 1,037.04 2,931.71 3.875 1,245.31 342.54 925.36 Pass-Major Risk 9,625.00 8,950.94 12,775.00 8,983.28 91.85 39.19 43.56 94321 2,849.40 3.875 1,120.55 343.38 800.87 Pass-Major Risk 9,625.00 8,950.94 12,800.00 8,983.53 91.85 39.40 43.69 922.43 2,835.50 3.875 1,095.86 343.43 776.53 Pass-Major Risk 9,625.00 8,950.94 12,825.00 8,983.80 91.85 39.59 43.86 900.86 2,82288 3.875 1,071.46 343.44 752.61 Pass-Major Risk 9,629.45 8,952.83 12,750.00 8,983.09 91.85 38.97 43.40 963.14 2,864.49 3.875 1,145.41 342.95 825.03 Pass-Major Risk 9,629.92 8,953.03 12,725.00 8,982.97 91.85 38.75 43.34 982.36 2,880.47 3.875 1,170.37 342.78 849.81 Pass-Major Risk 9,629.94 8,953.04 12,675.00 8,98325 91.85 38.28 43.28 1,019.60 2,913.82 3.875 1,220.35 342.43 899.73 Pass-Major Risk 9,630.18 8,953.14 12,700.00 8,983.03 91.85 38.52 43.29 1,001.30 2,896.79 3.875 1,195.36 342.60 874.70 Pass-Major Risk ficrav Ina ! CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 6/18/2015 12:35:34PM Page 4 COMPASS 5000.1 Build 61 .*'40 • BP • 11111W741149tivA;saw* .OP Travelling Cylinder Report BAKER f`��rns�** HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB J Pad MD Reference: Kelly Bushing/Rotary Table @ 69.20usft (NORDIC 1) Site Error: 0.00 usft North Reference: True Reference Well: J-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore J-1OB Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: J-10B WP07 Offset ND Reference: Offset Datum Offset Design PB J Pad- J-01-J-01 B-J-01 B Offset Site Error 0.00 usft Survey Program: 120-CB-GYRO-MS,8563-MWD,8707-MWD Rule Assigned:Major Risk Offset Well Error 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Monaca-i. Offset WeBhore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth .NIS , J-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) i°) (usft) (usft) (in) (usft) (usft) (usft) 10,725.00 8,977.03 10,725.00 8,947.09 93.70 29.53 -179.71 -910.48 1,118.20 3.687 1,295.00 398.37 900.57 Pass-Major Risk 10,725.00 8,977.03 10,750.00 8,948.11 93.70 29.88 -179.77 -929.65 1,134.22 3.687 1,314.20 399.23 919.01 Pass-Major Risk 10,736.60 8,977.03 10,700.00 8,946.03 93.74 29.16 -178.25 -892.04 1,101.37 3.687 1,278.54 398.80 881.52 Pass-Major Risk 10,750.00 8,977.03 10,600.00 8,943.83 93.79 27.64 -178.46 -824.91 1,027.37 3.687 1,211.69 395.90 819.02 Pass-Major Risk 10,750.00 8,977.03 10,625.00 8,943.99 93.79 28.01 -176.49 -842.27 1,045.35 3.687 1,228.14 396.92 834.58 Pass-Major Risk 10,750.00 8,977.03 10850.00 8,944.39 93.79 28.40 -176.53 -858.51 1,064.35 3.887 1,243.72 397.98 84921 Pass-Major Risk 10,750.00 8,977.03 10,675.00 8,945.08 93.79 28.78 -176.58 -874.70 1,083.38 3.687 1,259.55 399.03 864.11 Pass-Major Risk 10,782.69 8,977.03 10,575.00 8,943.55 93.83 27.28 -174.90 -806.32 1810.67 3.687 1,193.98 395.79 801.24 Pass-Major Risk 10,775.00 8,977.03 10,475.00 8,943.97 93.87 25.93 -173.34 -728.43 948.07 3.687 1,121.57 392.86 731.44 Pass-Major Risk 10,775.00 8977.03 10,500.00 8843.91 93.87 26.28 -173.37 -747.03 964.76 3.687 1,138.37 393.63 747.39 Pass-Major Risk 10,775.00 6977.03 10,525.00 8,943.61 93.87 26.61 -173.38 -766.93 979.89 3.687 1,156.90 394.55 765.10 Pass-Major Risk 10,775.00 8,977.03 10,550.00 8,943.43 93.87 26.94 -173.39 -786.86 994.98 3.687 1,175.69 395,45 783.10 Pass-Major Risk 10,788.67 8,977.03 10,450.00 8,944.04 93.92 25.57 -171.68 -710.94 930.21 3.687 1,106.05 391.85 716.50 Pass-Major Risk 10,800.00 8,977.03 10,375.00 8,943.44 93.96 24.42 -170.23 -664.99 871.09 3.687 1,068.67 38827 682.23 Pass-Major Risk 10,800.00 8,977.03 10,400.00 8,943.98 93.96 24.81 -170.28 -678.99 891.79 3.687 1879.31 389.51 891.76 Pass-Major Risk 10,800.00 8,977.03 10,425.00 8,944.19 93.96 25.19 -170.31 -694.37 911.49 3.687 1,091.92 390.70 703.31 Pass-Major Risk 10,815.70 8,977.03 10,350.00 8,942.72 94.02 24.02 -168.29 -652.44 849.49 3.687 1,059.75 386.57 674.74 Pass-Major Risk 11,010.55 8,971.88 10,325.00 8941.92 94.78 23.61 -177.54 -641.47 827.04 3.687 1,050.76 385.48 665.93 Pass-Major Risk 11,035.26 8,967.63 10,300.00 8,941.07 94.88 23.20 -177.70 -632.48 803.74 3.687 1,042.02 384.37 658.02 Pass-Major Risk 11,060.01 8,962.12 10,275.00 8,940.19 94.98 22.80 -177.93 -624.74 779.99 3.887 1834.51 383.63 651.17 Pass-Major Risk 11,084.31 8,955.50 10,250.00 8,939.31 95.08 22.39 -178.24 -817.31 756.13 3.687 1,027.30 383.02 844.51 Pass-Major Risk 11,107.84 8,947.96 10,225.00 8,938.48 95.17 21.98 -178.62 -609.53 732.39 3.687 1,019.78 382.41 637.51 Pass-Major Risk 11,130.26 8,939.77 10,200.00 8,937.78 95.26 21.57 -179.07 -600.71 709.01 3.687 1,01124 381.78 629.49 Pass-Major Risk 11,151.98 8,930.90 10,175.00 8,937.08 95.34 21.17 -179. 4-592.16 6 .54 3.687 1,003.04 381.12 621.83 Pass-Major Risk 11,173.31 8,921.33 10,150.00 8,936.28 95.42 20.76 179. 5 6 .57 3.687 996.44 380.43 615.78 Pass-Major Risk 11,194.04 8,911.21 10,125.00 8,935.39 95.50 20.38 179.1' 5 .27 '6 .28 3.687 991.21 379.72 611.14 Pass-Major Risk 11,214.35 8,900.55 10,100.00 8,934.04 95.58 19.97 178.50 -575.52 612.61 3.687 988.22 378.99 608.76 Pass-Major Risk,CC,ES,SF CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 6/18/2015 12::35:34PM Page 5 COMPASS 5000.1 Build 61 • BP 0 bp Travelling Cylinder Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB J Pad MD Reference: Kelly Bushing/Rotary Table @ 69.20usft (NORDIC 1) Site Error: 0.00 usft North Reference: True Reference Well: J-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore J-10B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: J-10B WP07 Offset ND Reference: Offset Datum Offset Design PB J Pad- J-01-J-01 B-Plan#7 Offset Site Error: 0.00 usft Survey Program: 120-CB-GYRO-MS,8563-MVVD.8662-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolace e Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth .NtS +EI-W Mole Size Centre Distance Deviation (usft) (usft) (usft) )usft) {usft) (usft) (*) (usft) (usft) (In) (usft) (usft) (usft) 10,725.00 8,977.03 10,700.00 8,949.66 93.70 28.94 -179.76 -845.61 1,113.66 3.687 1,230.10 397.84 836.01 Pass-Major Risk 10,725.00 8377.03 10,725.00 8,950.44 93.70 29.31 -179.81 -863.48 1,131.11 3.687 1,247.98 398.78 853.05 Pass-Major Risk 10,725.00 3977.03 10,734.00 3950.73 93.70 29.44 -179.83 -869.69 1,137.62 3.687 1,254.24 399.13 859.01 Pass-Major Risk 10,737.91 8,977.03 10,675.00 8,948.89 93.75 28.59 -178.15 -826.84 1,097.16 3.687 1,211.33 398.32 816.58 Pass-Major Risk 10,750.00 8,977.03 10,575.00 8,946.01 93.79 27.32 -176.46 -745.13 1,039.71 3.687 1,131.34 396.15 738.31 Pass-Major Risk 10,750.00 8,977.03 10,800.00 8,946.70 93.79 27.63 -176.52 -785.80 1,053.75 3.687 1,151.35 396.93 757.63 Pass-Major Risk 10,750.00 8,977.03 10,625.00 8,947.41 93.79 27.93 -176.58 -786.85 1,067.22 3.687 1,171.96 397.68 777.57 Pass-Major Risk 10,750.00 8,977.03 10,650.00 8,948.14 93.79 28.25 -176.84 -807.24 1,081.67 3.687 1,192.05 398.48 796.95 Pass-Major Risk 10,759.99 8,977.03 10,550.00 8,945.36 93.82 27.00 -175.20 -725.23 1,024.61 3.687 1,112.20 395.90 719.26 Pass-Major Risk 10,765.20 8,977.03 10,525.00 8,944.74 93.84 26.67 -174.52 -706.14 1,008.48 3.687 1,094.15 395.21 701.75 Pass-Major Risk 10,775.00 8,977.03 10,450.00 8,943.07 93.87 25.60 -173.17 -854.28 954.43 3.687 1,047.24 392.35 657.28 Pass-Major Risk 10,775.00 8,977.03 10,475.00 8,943.59 93.87 25.97 -173.23 -670.62 973.34 3.687 1,061.54 393.47 670.59 Pass-Major Risk 10,775.00 8,977.03 10,500.00 8,944.15 93.87 26.32 -173.28 -687.92 991.38 3.687 1,077.26 394.53 685.36 Pass-Major Risk 10,789.89 8,977.03 10,425.00 8,942.59 93.93 25.22 -171.34 -638.96 934.68 3.687 1,034.12 391.32 644.94 Pass-Major Risk 10,800.00 8,977.03 10,375.00 8,941.74 93.96 24.44 -170.03 -611.52 892.92 3.687 1,012.52 388.71 625.59 Pass-Major Risk 10,800.00 8,977.03 10,400.00 8,942.15 93.96 24.84 -170.08 -624.69 914.16 3.687 1,022.56 389.98 634.50 Pass-Major Risk 10,811.78 8,977.03 10,350.00 8,941.38 94.01 24.05 -168.58 -599.47 871.02 3.687 1,004.00 387.06 618.48 Pass-Major Risk 10,825.00 8,977.03 10,325.00 8,941.06 94.06 23.64 -166.96 -588.59 848.52 3.887 997.19 385.08 613.39 Pass-Major Risk 11,013.32 8,971.47 10,300.00 8,940.78 94.79 23.24 -177.39 -578.90 825.48 3.687 988.26 385.09 603.65 Pass-Major Risk 11,038.13 8,967.06 10,275.00 8,940.55 94.89 22.83 -177.61 -570.42 801.96 3.687 980.01 384.20 596.15 Pass-Major Risk 11,062.83 8,961.41 10,250.00 8,940.36 94.99 22.42 -177.91 -563.19 778.04 3.687 972.99 383.60 589.68 Pass-Major Risk 11,087.21 8,954.63 10,225.00 8,940.21 95.09 22.02 -178.29 -557.22 753.76 3.687 967.23 382.97 584.47 Pass-Major Risk 11,111.07 8,946.84 10,200.00 8,940.11 95.18 21.61 -178.76 -552.52 729.21 3.687 962.80 382.32 580.57 Pass-Major Risk 11,134.24 8,938.21 10,175.00 8,940.06 95.27 21.21 -179.31 549.12 704.45 3.687 959.72 381.65 578.04 Pass-Major Risk 11,156.57 8,928.91 10,150.00 8,940.05 95.36 20.82 -179.93 -546.89 679.55 3.687 957.92 380.97 576.79 Pass-Major Risk 11,177.88 8,919.16 10,125.00 8,940.05 95.44 20.44 179.39 -543.98 654.72 3.687 955.57 380.28 575.00 Pass-Major Risk 11,198.07 8,909.16 10,100.00 8,940.05 95.52 20.04 178.64 -539.76 630.08 3.687 952.10 379.57 572.13 Pass-Major Risk,CC,ES,SF CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 6/18/2015 12::35:34PM Page 6 COMPASS 5000.1 Build 61 • BP • ram rft bp Travelling Cylinder Report SNEER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB J Pad MD Reference: Kelly Bushing/Rotary Table @ 69.20usft (NORDIC 1) Site Error: 0.00 usft North Reference: True Reference Well: J-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore J-1OB Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: J-10B WP07 Offset TVD Reference: Offset Datum Offset Design PB J Pad- J-10-J-10-J-10 Offset Site Error: 0.00 usft Survey Program: 100-BOSS-GYRO Rule Assigned:NOERRORS Offset Well Error: 0.00 usfl Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth a44fS CEI-W Hole Size Centre Distance Deviation (usft) Mitt) (usft) (usft) (usft) (usft) (9 Wet) lush) (in) (usft) (usft) (usft) 8,825.00 8,266.65 8,825.00 8,266.65 0.14 0.29 114.60 -98.52 2,226.16 5.750 0.00 0.50 -0.48 FAIL-NOERRORS 8,850.00 6291.17 8,850.00 8,291.17 0.29 0.58 115.85 -100.60 2,230.57 5.750 0.00 0.48 -0.48 FAIL-NOERRORS 8,875.00 8,315.71 8,875.00 8,315.71 0.43 0.86 117.14 -102.72 2,234.85 5.750 0.00 0.52 -0.51 FAIL-NOERRORS 8,900.00 8,340.27 8,900.00 8,340.27 0.58 1.15 118.50 -104.90 2,238.98 5.750 0.00 0.59 -0.56 FAIL-NOERRORS,CC 8,925.00 8,364.85 8,925.00 8,364.84 0.58 1.43 111.36 -107.11 2,242.98 5.750 0.05 0.67 -0.60 FAIL-NOERRORS,ES,SF 8,950.00 8,389.48 8,950.00 8,389.44 0.58 1.70 111.38 -109.31 2,246.87 5.750 0.20 0.75 -0.53 FAIL-NOERRORS 8,975.00 8,414.13 8,975.00 8,414.06 0.58 1.98 111.39 -111.51 2,250.65 5.750 0.46 0.83 -0.36 FAIL-NOERRORS 8,999.96 8,438.83 9,000.00 8,438.69 0.58 2.26 128.95 -113.70 2,254.32 5.750 1.13 1.14 -0.01 FAIL-NOERRORS 9,024.81 8,463.50 9,025.00 8,463.34 0.58 2.51 148.04 -115.88 2,257.89 5.750 2.81 1.58 1.23 Pass-NOERRORS 9,049.43 8,487.94 9,050.00 8,488.00 0.58 2.77 157.75 -118.01 2,261.40 5.750 5.72 2.07 3.65 Pass-NOERRORS 9,073.69 8,511.97 9,075.00 8,512.67 0.58 3.02 162.75 -120.09 2,264.84 5.750 9.86 2.57 7.29 Pass-NOERRORS 9,097.51 8,535.45 9,100.00 8,537.36 0.58 3.28 165.62 -122.13 2,268.20 5.750 15.19 3.06 12.14 Pass-NOERRORS 9,121.00 8,558.52 9,125.00 8,562.06 0.58 3.51 165.84 -124.14 2,271.52 5.750 21.54 3.47 18.10 Pass-NOERRORS 9,143.98 8,581.03 9,150.00 8,586.76 0.58 3.75 164.41 -126.12 2,274.82 5.750 28.76 3.89 24.94 Pass-NOERRORS 9,166.39 8,602.86 9,175.00 8,611.47 0.58 3.98 162.42 -128.08 2,278.08 5.750 36.87 4.31 32.65 Pass-NOERRORS 9,188.14 8,623.89 9,200.00 8,836.18 0.58 4.21 160.30 -130.02 2,281.32 5.750 45.85 4.73 41.25 Pass-NOERRORS 9,20920 8,644.07 9,225.00 8,660.90 0.58 4.43 158.24 -131,92 2,284.52 5.750 55.70 5.13 50.71 Pass-NOERRORS 9,229.52 8,663.32 9,250.00 8,685.63 0.58 4.65 156.30 -133.78 2,287.70 5.750 66.39 5.49 61.02 Pass-NOERRORS 9,250.00 8,682.48 9,275.00 8,710.36 0.58 4.87 154.50 -135.61 2,290.84 5.750 77.90 5.89 72.15 Pass-NOERRORS 9,267.86 8,698.96 9,300.00 8,735.10 0.58 5.09 152.88 -137.39 2,293.96 5.750 90.17 6.22 84.08 Pass-NOERRORS 9,285.87 8,715.32 9,325.00 8,759.85 0.58 5.30 151.40 -139.15 2,297.02 5.750 103.19 6.55 96.77 Pass-NOERRORS 9,303.09 8,730.74 9,350.00 8,784.61 0.58 5.51 150.07 -140.90 2,300.03 5.750 116.91 6.85 110.18 Pass-NOERRORS 9,319.55 8,745.22 9,375.00 8,809.38 0.58 5.71 148.88 -142.64 2,302.97 5.750 13129 7.14 124.27 Pass-NOERRORS 9,335.27 8,758.81 9,400.00 8,834.15 0.58 5.92 147 #-144.36 2, .85 5.750 14629 7.40 139.00 Pass-NOERRORS a3 .69 5.750 1.87 7.65 154.32 Pass-NOERRORS 9,364.55 8,783.44 9,450.00 8,883.71 0.58 6.31 145. 1$..7� 7 3 .511 5.750 178.00 7.88 170.20 Pass-NOERRORS 9,375.00 8,792.01 9,475.00 8,908.50 0.59 6.51 145.11 -149.37 2,314.31 5.750 194.66 8.05 186.68 Pass-NOERRORS 9,391.13 8,804.98 9,500.00 8,933.30 0.59 6.70 144.29 -150.96 2,317.09 5.750 211.72 8.29 203.48 Pass-NOERRORS 9,400.00 8,811.98 9,525.00 8,958.10 0.59 6.88 143.62 -152.53 2,319.82 5.750 229.28 8.43 220.90 Pass-NOERRORS 9,415.27 8,823.80 9,550.00 8,982.91 - 0.60 7.06 142.92 -154.08 2,322.48 5.750 247.18 8.66 238.54 Pass-NOERRORS 9,425.00 8,831.18 9,575.00 9,007.73 0.60 7.24 142.34 -155.60 2,325.06 5.750 265.44 8.81 256.68 Pass-NOERRORS 9,437.25 8,840.28 9,600.00 9,032.56 0.61 7.42 141.77 -157.09 2,327.57 5.750 284.05 8.99 275.11 Pass-NOERRORS 9,450,00 8,849.54 9,625.00 9,057.39 0.62 7.60 141.23 -158.58 2,330.02 5.750 303.01 9.17 293.89 Pass-NOERRORS 9,457.25 8,854.70 9,650.00 9,082.23 0.62 7.78 140.79 -160.07 2,332.45 5.750 322.26 9.27 313.03 Pass-NOERRORS 9,48.55 8,861.21 9,675.00 9,107.07 0.63 7.95 140.34 -161.56 2,334.85 5.750 341.83 9.40 332.47 Pass-NOERRORS 9,475.00 8,867.02 9,700.00 9,131.91 0.63 8.12 139.93 -163.05 2,337.26 5.750 361.68 9.51 352.21 Pass-NOERRORS 9,483.86 8,873.00 9,725.00 9,156.75 0.64 8.30 139.53 -164.54 2,339.66 5.750 381.80 9.63 372.21 Pass-NOERRORS 9,487.13 8,875.17 9,735.00 9,18.68 0.64 8.37 139.38 -165.14 2,340.62 5.750 389.92 9.67 380.28 Pass-NOERRORS CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 6/18/2015 12.35::34PM Page 7 COMPASS 5000.1 Build 61 • BP • ` 0 bp Travelling Cylinder Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-10 Project: Prudhoe Bay ND Reference: Mean Sea Level Reference Site: PB J Pad MD Reference: Kelly Bushing/Rotary Table @ 69.20usft (NORDIC 1) Site Error: 0.00 usft North Reference: True Reference Well: J-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore J-1 OB Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: J-1 0B WP07 Offset ND Reference: Offset Datum Offset Design PB J Pad- J-10-J-10A-J-10A Offset Site Error: 0.00 usfl Survey Program: 100-BOSS-GYRO,9355-MWD Rule Assigned:NOERRORS Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface t Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth i-Ni-S *E/-W Hole Size Centre Distance Deviation (usft) lusft) lush) (usft) (usft) (usfl) (1 (ustt) (ustt) lint (usfl) (usfl) (ustt) 6825.00 8266.65 8,825.00 8,266.65 0.14 029 114.60 -98.52 2,226.16 3.687 0.00 0.32 -0.31 FAIL-NOERRORS 8,850.00 8,291.17 8,850.00 8,291.17 029 0.58 115.85 -100.60 2,230.57 3.687 0.00 0.31 -0.31 FAIL-NOERRORS 8,875.00 8,315.71 8,875.00 8,315.71 0.43 0.86 117.14 -102.72 2,234.85 3.687 0.00 0.35 -0.34 FAIL-NOERRORS 8,900.00 8,34027 8,900.00 8,340.27 0.58 1.15 118.50 -104.90 2,238.98 3.687 0.00 0.42 -0.39 FAIL-NOERRORS,CC 8,925.00 8,364.85 8,925.00 8164.84 0.58 1.43 111.36 -107.11 2242.98 3.687 0.05 0.50 -0.43 FAIL-NOERRORS,ES,SF 8,950.00 8,389.48 8,950.00 8,389.44 0.58 1.70 111.38 -109.31 2,246.87 3.687 0.20 0.58 -0.36 FAIL-NOERRORS 8,975.00 8,414.13 8,975.00 8,414.06 0.58 1.98 111.39 -111.51 2250.65 3.687 0.46 0.66 -0.19 FAIL-NOERRORS 8,999.96 8438.83 9,000.00 8,438.69 0.58 2.26 128.95 -113.70 2,254.32 3.687 1.13 0.97 0.16 Pass-NOERRORS 9,024.81 8,463.50 9,025.00 8,463.34 0.58 2.51 148.04 -115.88 2,257.89 3.687 2.81 1.41 1.41 Pass-NOERRORS 9,049.43 8,487.94 9,050.00 8,488.00 0.58 2.77 157.75 -118.01 2,261.40 3.687 5.72 1.90 3.82 Pass-NOERRORS 9,073.69 8,511.97 9,075.00 8,512.67 0.58 3.02 162.75 -120.09 2,264.84 3.687 9.86 2.39 7.46 Pass-NOERRORS 9,097.51 8,535.45 9,100.00 8,537.36 0.58 3.28 165.62 -122.13 2,288.20 3.687 15.19 2.88 12.31 Pass-NOERRORS 9,121.00 8,558.52 9,125.00 8,562.06 0.58 3.51 165.84 -124.14 2,271.52 3.687 21.54 3.30 18.27 Pass-NOERRORS 9,143.98 6581.03 9,150.00 8,586.76 0.58 3.75 164.41 -126.12 2,274.82 3.687 28.76 3.72 25.11 Pass-NOERRORS 9,166.39 8,602.86 9,175.00 8,611.47 0.58 3.98 162.42 -128.08 2,278.08 3.667 36.87 4.14 32.82 Pass-NOERRORS 9,188.14 8,623.89 9,200.00 8,836.18 0.58 4.21 160.30 -130.02 2,281.32 3.687 45.85 4.56 41.42 Pass-NOERRORS 9,200.00 8,835.28 10,450.00 8,961.00 0.58 8.65 146.79 -967.04 2,861.38 3.687 1,112.99 5.52 1,112.68 Pass-NOERRORS 9,200.00 8,63528 10,475.00 8,961.14 0.58 8.83 146.59 -985.87 2,878.04 3.687 1,136.74 5.65 1,136.44 Pass-NOERRORS 9,200.00 8,635.28 10,500.00 8,960.53 0.58 9.01 146.42 -1,004.66 2,894.29 3.887 1,160.39 5.78 1,160.08 Pass-NOERRORS 9,200.00 8,635.28 10,525.00 8,959.39 0.58 9.20 146.28 -1,023.93 2,910.17 3.687 1,183.98 5.91 1,183.67 Pass-NOERRORS 9,200.00 8,635.28 10,550.00 8,958.46 0.58 9.40 146.19 -1,043.88 2,925.24 3.887 1,207.75 6.04 1,207.44 Pass-NOERRORS 9,200.00 8,635.28 10,575.00 8,957.86 0.58 9.60 146.14 -1,064.24 2,939.69 3.687 1,231.69 6.17 1,231.38 Pass-NOERRORS 9,200.00 8,635.28 10,600.00 8,958.13 058 9.80 146.12 -1,084.88 2,953.81 3.687 1,255.90 6.30 1,255.59 Pass-NOERRORS 9,200.00 8,635.28 10,625.00 8,959.54 0.58 10.01 1461 °ea.m -1,10573 2,9 .51 3.687 1,280.38 6.42 1,280.08 Pass-NOERRORS 6200.00 8635.28 10650.00 8,962.33 0.58 1023 1461 ,1 1-' 9 .45 3.687 1,305.09 8.54 1,304.78 Pass-NOERRORS 9208.65 8643.55 10425.00 8,960.59 0.58 8.47 146. 9 271 a", 8 .80 3.687 1689.30 5.39 1,089.00 Pass-NOERRORS 9,209.20 8,644.07 9,225.00 8,660.90 0.58 4.43 158.24 -131.92 2,284.52 3.687 55.70 4.95 50.88 Pass-NOERRORS 9,210.61 8,645.41 10,400.00 8,959.98 0.58 8.30 147.28 -932.15 2,825.60 3.687 1,065.86 5.26 1,065.55 Pass-NOERRORS 9,212.50 8,647.21 10,375.00 8,959.08 0.58 8.14 147.63 -915.52 2,806.95 3.687 1,042.55 5.12 1,042.25 Pass-NOERRORS 9,214.20 8,648.82 10,350.00 8,957.45 0.58 7.98 148.03 -899.25 2,788.05 3.687 1,019.24 4.99 1,018.94 Pass-NOERRORS 9,215.78 8,650.32 10,325.00 8,955.26 0.58 7.82 148.44 -882.95 2,769.21 3.687 995.86 4.85 995.55 Pass-NOERRORS 9,225.00 8,659.06 10,175.00 8,950.20 0.58 6.97 150.18 -771.49 2,669.62 3.687 855.03 4.04 854.72 Pass-NOERRORS 9,225.00 8,659.06 10,200.00 8,950.70 0.58 7.10 150.01 -791.87 2,684.09 3.687 878.65 4.17 878.34 Pass-NOERRORS 9,225.00 8,659.06 10,225.00 8,950.82 0.58 723 149.75 -81128 2,699.84 3.887 902.05 4.30 901.74 Pass-NOERRORS 9,225.00 8,659.06 10,250.00 8,950.61 0.58 7.37 149.42 -829.85 2,716.56 3.687 92523 4.44 924.92 Pass-NOERRORS 9,225.00 8,659.06 10,275.00 8,951.22 0.58 7.52 149.08 -848.15 2,733.59 3.687 948.68 4.57 948.37 Pass-NOERRORS 9,225.00 8,659.06 10,300.00 8,952.93 0.58 7.67 148.74 -866.08 2,750.91 3.687 972.39 4.71 972.08 Pass-NOERRORS 9,229.52 8,663.32 9,250.00 8,685.63 0.58 4.65 156.30 -133.78 2,287.70 3.687 66.39 5.32 61.19 Pass-NOERRORS 9,233.55 8,667.11 10,150.00 8,949.96 0.58 6.85 150.17 -750.41 2,656.19 3.687 831.39 3.91 831.08 Pass-NOERRORS 9,237.20 8,670.53 10,125.00 8,950.76 0.58 6.74 150.17 -728.94 2,643.41 3.687 808.20 3.79 807.89 Pass-NOERRORS 9,241.23 8,874.31 10,100.00 8,952.23 0.58 6.63 150.10 -707.00 2,631.53 3.687 785.36 3.67 785.05 Pass-NOERRORS 9,250.00 8,682.48 9,275.00 8,710.36 0.58 4.87 154.50 -135.81 2,290.84 3.887 77.90 5.71 72.32 Pass-NOERRORS 9,250.00 8,682.48 10,025.00 8,954.81 0.58 6.35 149.52 -639.05 2,599.96 3.687 716.89 3.32 716.58 Pass-NOERRORS 9,250.00 8,682.48 10,050.00 8,954.67 0.58 6.44 149.70 -681.78 2,610.36 3.887 739.89 3.43 739.58 Pass-NOERRORS 9,250.00 8,682.48 10,075.00 8,953.86 0.58 6.53 149.88 -684.55 2,620.65 3.687 762.75 3.55 762.44 Pass-NOERRORS 9,257.54 8,689.46 10,000.00 8,954.75 0.58 6.27 149.35 -617.01 2,588.18 3.687 693.74 3.20 693.43 Pass-NOERRORS 9,261.67 8,693.27 9,975.00 8,954.61 0.58 6.19 149.35 -595.70 2,575.11 3.687 670.63 3.08 670.32 Pass-NOERRORS CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 6/18/2015 12:35:34PM Page 8 COMPASS 5000.1 Build 61 • BP • Valli 0 bp Travelling Cylinder Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-10 Project: Prudhoe Bay ND Reference: Mean Sea Level Reference Site: PB J Pad MD Reference: Kelly Bushing/Rotary Table @ 69.20usft (NORDIC 1) Site Error: 0.00 usft North Reference: True Reference Well: J-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore J-10B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: J-10B WP07 Offset ND Reference: Offset Datum Offset Design PB J Pad- J-10-J-1 OA-J-10A Offset Site Error: 0.00 usft Survey Program: 100-BOSS-GYRO.9355-MWD Rule Assigned:NOERRORS Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Tooltace+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth .K1/-S +E!-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) tusft) (°1 (usft) (usft) GN (usft) (usft) (usft) 9,265.94 8,697.20 9,950.00 8,954.44 0.58 6.11 149.43 -574.94 2,561.18 3.687 647.61 2.95 647.30 Pass-NOERRORS 9,267.86 8,698.96 9,300.00 8,735.10 0.58 5.09 152.88 -137.39 2,293.96 3.687 90.17 6.05 84.26 Pass-NOERRORS 9,275.00 8,705.48 9,875.00 8,952.28 0.58 5.91 149.51 -511.29 2,521.59 3.687 578.36 2.57 578.05 Pass-NOERRORS 9,275.00 8,705.48 9,900.00 8,953.01 0.58 5.97 149.50 -532.79 2,534.33 3.687 601.35 2.70 601.05 Pass-NOERRORS 9,275.00 8,705 48 9,925.00 8,953.79 0.58 6.04 149.44 -554.00 2,547.54 3.687 624.51 2.82 624.21 Pass-NOERRORS 9,283.93 8,713.57 9,850.00 8,951.51 0.58 5.86 149.32 -489.37 2,509.60 3.687 555.39 2.45 555.08 Pass-NOERRORS 9,285.87 8,715.32 9,325.00 8,759.85 0.58 5.30 151.40 -139.15 2,297.02 3.687 103.19 6.38 96.94 Pass-NOERRORS 9,288.93 8,718.08 9,825.00 8,950.85 0.58 5.81 149.03 -466.86 2,498.76 3.687 532.67 2.34 532.36 Pass-NOERRORS 9,300.00 8,727.99 9,750.00 8,949.47 0.58 5.69 147.22 -396.68 2,472.40 3.687 466.49 2.03 466.18 Pass-NOERRORS 9,300.00 8,727.99 9,775.00 8,949.83 0.58 5.72 147.91 -420.31 2,480.57 3.687 488.19 2.12 487.88 Pass-NOERRORS 9,300.00 8,727.99 9,800.00 8,950.37 0.58 5.76 148.48 -443.74 2,489.26 3.687 510.37 2.22 510.06 Pass-NOERRORS 9,302.92 8,730.59 9,350.00 8,784.56 0.58 5.44 150.04 -141.17 2,300.26 3.687 117.19 1.44 115.84 Pass-NOERRORS 9,311.64 8,73829 9,725.00 8,950.19 0.58 5.66 146.32 -373.07 2,464.22 3.687 445.39 1.92 445.09 Pass-NOERRORS 9,318.27 8,744.10 9,375.00 8,808.93 0.58 5.46 148.75 -144.58 2,304.56 3.687 133.25 0.65 132.94 Pass-NOERRORS 9,318.76 8,744.53 9,700.00 8,951.82 0.58 5.63 145.51 -349.81 2,455.22 3.687 424.88 1.82 424.57 Pass-NOERRORS 9,325.00 8,749.96 9,675.00 8,954.03 0.58 560 144.85 -32724 2,444.73 3.687 404.67 1.71 404.36 Pass-NOERRORS 9,331.12 8,755.24 9,400.00 8,832.48 0.58 5.46 147.55 -150.30 2,310.65 3.687 151.95 0.69 151.65 Pass-NOERRORS 9,334.79 8,758.40 9,650.00 8,956.47 0.58 5.57 14428 -305.30 2,433.00 3.687 384.65 1.60 384.34 Pass-NOERRORS 9,341.36 8,764.01 9,425.00 8,854.83 0.58 5.46 146.39 -158.04 2,318.71 3.687 172.80 0.73 172.49 Pass-NOERRORS 9,342.56 8,765.03 9,625.00 8,957.07 0.58 5.55 143.84 -283.79 2,420.29 3.687 36374 1.49 363.43 Pass-NOERRORS 9,350.00 8,771.32 9,450.00 8,875.72 0.58 5.46 145.34 -167.63 2,328.50 3.687 195.28 0.80 194.98 Pass-NOERRORS 9,350.00 8,771.32 9,575.00 8,948.24 0.58 5.51 143.42 -243.18 2,392.83 3.687 317.72 1.26 317.42 Pass-NOERRORS 9,350.00 8,771.32 9,600.00 8,954.43 0.58 5.52 143.51 -262.92 2,406.83 3.687 341.37 1.37 341.06 Pass-NOERRORS 9,354.43 8,775.04 9,475.00 8,894.92 0.58 5.46 144.59. '-179.05 2,339.69 3.687 218.94 0.87 218.64 Pass-NOERRORS 9,357.02 8,777.20 9,550.00 8,939.04 0.58 5.49 143.42 _ 224.83 2378.59 3.687 29323 1.15 292.92 Pass-NOERRORS 9,357.49 8,777.59 9,500.00 8,912.12 0.58 5.47 143.93 -192.44 2,351.90 3.687 243.43 0.95 243.13 Pass-NOERRORS 9,358.30 8,778.26 9,525.00 8,926.93 0.58 5.48 143.60 -207.80 2,364.89 3.687 268.34 1.05 268.03 Pass-NOERRORS CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 6/18/2015 12:35:34PM Page 9 COMPASS 5000.1 Build 61 • BP • 0 bp Travelling Cylinder Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB J Pad MD Reference: Kelly Bushing/Rotary Table @ 69.20usft (NORDIC 1) Site Error: 0.00 usft North Reference: True Reference Well: J-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore J-10B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: J-10B WP07 Offset TVD Reference: Offset Datum Offset Design PB J Pad- J-16-J-16B-J-16B Offset Site Error 0 00 usft Survey Program: 100-GYD-CT-CMS.9444-MWD.9600-MWD Rule Assigned:Major Risk Onset Well Error. 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +NIS +E/-W Hole Size Centre Distance Deviation Wet) (usft) (usft) (usft) (usft) (usft) P) (usft) (usft) lin) iusft) (usft) (usk) 9215.29 8,649.86 10,725.00 8,973.49 91.80 20.43 -160.86 -1273.82 1,816.10 3.875 1,314.72 358.57 967.32 Pass-Major Risk 9,225.00 8,659.06 10,750.00 8,974.35 91.80 20.41 -160.63 -1,248.84 1,815.89 3.875 1,292.46 358.22 946.01 Pass-Major Risk 9,225.00 8,659.06 10,775.00 8,974.75 91.80 20.39 -160.33 -1,223.86 1,816.42 3.875 1,269.71 358.18 923.62 Pass-Major Risk 9,225.00 8,659,06 10,800.00 8,974.68 91.80 20.37 -160.01 -1,198.87 1,817.08 3.875 1,246.95 358.12 901.27 Pass-Major Risk 9.233.40 8,666.97 10,825.00 8,974.05 91.80 20.35 -159.70 -1,173.90 1,816.25 3.875 1,224.64 357.40 879.92 Pass-Major Risk 9,237.70 8,671.00 10,850.00 8,972.82 91.80 20.32 -159.28 -1,149.02 1,814.10 3.875 1,202.86 356.88 858.96 Pass-Major Risk 9,242.27 8,675.28 10,875.00 8,971.66 91.80 20.30 -158.81 -1,12423 1,811.08 3.875 1,181.59 356.25 838.58 Pass-Major Risk 9,250.00 8,682.48 10,900.00 8,970.77 91.80 20.29 -158.32 -1,099.57 1,807.14 3.875 1,160.98 355.08 819.08 Pass-Major Risk 9,250.00 8,682.48 10,925.00 8,970.10 91.80 20.27 -157.68 -1,075.14 1,801.89 3.875 1,141.30 355.01 800.21 Pass-Major Risk 9,258.52 8,690.37 10,950.00 8,969.55 91.80 20.27 -157.06 -1,050.99 1,795.44 3.875 1,122.55 353.52 782.74 Pass-Major Risk 9,265.12 8,696.45 10,975.00 8,969.63 91.80 20.27 -156.37 -1,027.22 1,787.72 3.875 1,105.03 352.96 766.48 Pass-Major Risk 9,275.00 8,705.48 11,000.00 8,969.89 91.80 20.28 -155.66 -1,003.83 1,778.89 3.875 1,088.81 352.36 751.51 Pass-Major Risk 9,279.67 8,709.72 11,025.00 8,969.97 91.80 20.30 -154.87 -980.38 1,770.25 3.875 1,07225 351.97 736.41 Pass-Major Risk 9,287.40 8,716.71 11,050.00 8,970.06 91.80 20.31 -154.16 -956.46 1,762.99 3.875 1,055.12 351.24 720.61 Pass-Major Risk 9,295.82 8,724.09 11,075.00 8,970.39 91.80 20.33 -153.49 -932.21 1,756.93 3.875 1,037.44 350.32 704.21 Pass-Major Risk 9,303.62 8,731.21 11,100.00 8,969.99 91.80 20.35 -152.83 -907.70 1,752.05 3.875 1,019.00 349.30 687.02 Pass-Major Risk 9,311.86 8,738.48 11,125.00 8,969.62 91.80 20.37 -152.23 -88295 1,748.54 3.875 999.90 348.14 669.10 Pass-Major Risk 9,320.23 8,745.81 11,150.00 8,969.25 91.80 20.40 -151.67 -858.04 1,746.47 3.875 980.10 346.87 650.40 Pass-Major Risk 9,328.95 8,753.37 11,175.00 8,969.11 91.80 20.42 -151.16 -833.07 1,745.41 3.875 959.92 345.95 631.27 Pass-Major Risk 9,338.34 8,761.43 11,200.00 8,969.39 91.80 20.45 -150.65 -808.09 1,744.40 3.875 939.95 345.32 612.32 Pass-Major Risk 9,34826 8,769.85 11,225.00 8,969.39 91.80 20.50 -150.07 -783.20 1,742.12 3.875 920.79 344.52 59428 Pass-Major Risk 9,358.81 8,778.69 11,250.00 8,969.15 91.80 20.56 -149.41 -758.46 1,738.50 3.875 902.59 343.56 577.27 Pass-Major Risk 9,370.12 8,788.03 11,275.00 8,968.84 91.80 20.65 -148.71 -733.90 1,733.88 3.875 885.27 342.41 561.16 Pass-Major Risk 9,382.56 8,798.13 11,300.00 8,968.77 91.80 20.76 -147 *" L709.59 1,7 .05 3.875 869.09 341.03 546.21 Pass-Major Risk 9,396.18 8,808.98 11,325.00 8,968.83 91.81 20.90 -147.1 7 .77 3.875 854.32 339.39 532.67 Pass-Major Risk 9,410.88 8,820.43 11,350.00 8,968.72 91.81 21.07 -146. B .25 7,.08 3.875 840.99 337.98 520.57 Pass-Major Risk 9,426.67 8,832.43 11,375.00 8,968.42 91.81 21.25 -145.43 -639.28 1,702.21 3.875 828.95 33724 509.70 Pass-Major Risk 9,443.36 8,844.75 11,400.00 8,967.60 91.81 21.45 -144.52 -616.71 1,691.49 3.875 817.96 336.30 499.81 Pass-Major Risk 9,462.12 8,858.13 11,425.00 8,967.50 91.81 21.67 -143.85 -594.69 1,679.86 3.875 808.47 335.07 491.23 Pass-Major Risk 9,482.82 8,872.17 11,450.00 8,967.62 91.81 21.89 -142.82 -573.12 1,667.03 3.875 800.11 333.55 483.53 Pass-Major Risk 9,504.54 8,886.48 11,475.00 8,967.52 91.82 22.13 -142.02 -551.81 1,653.95 3.875 792.43 332.03 476.28 Pass-Major Risk 9,527.69 8,900.78 11,500.00 8,967.08 91.82 22.36 -141.28 -530.31 1,641.21 3.875 784.53 331.74 468.58 Pass-Major Risk 9,551.72 8,914.89 11,525.00 8,966.37 91.83 22.58 -140.63 -507.97 1,630.02 3.875 775.09 33123 459.05 Pass-Major Risk 9,577.53 8,928.54 11,550.00 8,966.57 91.83 22.79 -140.13 -485.20 1,619.72 3.875 764.88 330.48 448.34 Pass-Major Risk 9,603.83 8,941.46 11,575.00 8,986.69 91.84 23.01 -139.74 -461.80 1,810,93 3.875 753.18 329.56 435.85 Pass-Major Risk 9,629.75 8,952.96 11,600.00 8,966.38 91.85 23.22 -139.42 -437.76 1,604.12 3.875 739.63 329.42 421.30 Pass-Major Risk 9,655.65 8,963.20 11,625.00 8,966.24 91.86 23.43 -139.20 -413.35 1,598.70 3.875 724.80 330.00 405.25 Pass-Major Risk 9,682.17 8,972.36 11,850.00 8,966.87 91.87 23.65 -139.13 -388.85 1,593.79 3.875 709.44 330.51 388.38 Pass-Major Risk 9,709.18 8,980.29 11,675.00 8,967.97 91.89 23.89 -139.19 -364.34 1,588.98 3.875 693.85 330.97 371.03 Pass-Major Risk 9,737.33 8,987.01 11,700.00 8,969.00 91.91 24.15 -139.35 -340.08 1,583.05 3.875 678.96 331.43 354.15 Pass-Major Risk 9,766.48 8,992.29 11,725.00 8,969.45 91.92 24.44 -139.57 -316.13 1,575.92 3.875 664.86 332.40 337.87 Pass-Major Risk 9,796.32 8,995.90 11,750.00 8,969.61 91.95 24.73 -139.90 -292.44 1,567.92 3.875 651.26 334.50 321.93 Pass-Major Risk 9,826.67 8,997.71 11,775.00 8,969.75 91.97 25.02 -140.38 -269.04 1,559.14 3.875 638.07 336.61 306.29 Pass-Major Risk 9,853.16 8,997.73 11,800.00 8,969.89 91.99 25.32 -140.64 -246.03 1,549.35 3.875 625.55 337.87 292.14 Pass-Major Risk 9,876.76 8,996.51 11,825.00 8,970.00 92.01 25.63 -140.71 -223.62 1,538.29 3.875 614.19 338.48 279.83 Pass-Major Risk 9,900.86 8,994.07 11,850.00 8,970.12 92.03 25.93 -140.90 -201.94 1,525.85 3.875 604.20 339.56 268.87 Pass-Major Risk 9,925.14 8,990.39 11,875.00 8,970.25 92.05 26.13 -141.22 -180.93 1,512.31 3.875 595.35 342.70 259.32 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 6/18/2015 12:35:34PM Page 10 COMPASS 5000.1 Build 61 • BP i Irak' 0 bp Travelling Cylinder Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Wet J-10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB J Pad MD Reference: Kelly Bushing/Rotary Table @ 69.20usft (NORDIC 1) Site Error: 0.00 usft North Reference: True Reference Well: J-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore J-10B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: J-108 WP07 Offset TVD Reference: Offset Datum Offset Design PB J Pad- J-16-J-16B-J-16B Offset Site Error. 0.00 usft Survey Program: 100-GYD-CT-CMS,9444-MIND,9600-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Tootface v Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth .NIS aE/-W Hole Size Centre Distance Deviation (usft) (use) iusft) iusft) iusft) iusft) Ft (usC) (usft) (in) (usft) Omit) (usft) 9,948.44 8,985.85 11,900.00 8,970.37 92.07 26.29 -141.65 -159.93 1,498.74 3.875 586.54 346.13 250.08 Pass-Major Risk,CC,ES,SF CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 6/18/2015 12:35:34PM Page 11 COMPASS 5000.1 Build 61 • BP • Travelling Cylinder Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB J Pad MO Reference: Kelly Bushing/Rotary Table @ 69.20usft (NORDIC 1) Site Error: 0.00 usft North Reference: True Reference Well: J-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore J-10B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: J-10B WP07 Offset ND Reference: Offset Datum Offset Design PB J Pad- J-16-J-16BPB1-J-16BPB1 Offset Site Error. 0.00 usft Survey Program: 100-GY0-CT-CMS.9444-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface* Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth *NI-S *EI-W Hole Size Centre Distance Deviation tusit) (usft) (usft) (usft) (usft) (usft) ll (usft) iustt) (in) ()sft) lusft) iusft) 9,211.18 6645.96 10,675.00 8,970.27 91.80 20.47 -162.04 -1,278.81 1,845.23 4.125 1,308.84 358.76 959.82 Pass-Major Risk 9,214.85 8,649.44 10,700.00 8,970.20 91.80 20.46 -161.98 -1,254.28 1,850.05 4.125 1,284.86 358.33 936.19 Pass-Major Risk 9,218.92 8,653.30 10,725.00 8,970.53 91.80 20.44 -161.87 -1,229.54 1,853.63 4.125 1,261.21 358.25 912.98 Pass-Major Risk 9,225.00 8,659.06 10,750.00 8,970.84 91.80 20.42 -161.73 -1,204.69 1,856.30 4.125 1,237.78 357.98 890.15 Pass-Major Risk 9,225.00 8,659.06 10,775.00 8,971.11 91.80 20.40 -161.48 -1,179.75 1,858.06 4.125 1,214.61 357.93 867.28 Pass-Major Risk 9,231.96 8,665.62 10,800.00 8,970.95 91.80 20.37 -161.25 -1,154.76 1,858.73 4.125 1,191.69 357.38 845.14 Pass-Major Risk 9,236.06 8,669.47 10,825.00 8,969.83 91.80 20.34 -160.91 -1,129.80 1,858.07 4.125 1,169.06 356.92 823.22 Pass-Major Risk 9,240.07 8,673.23 10,850.00 8,968.10 91.80 20.32 -160.47 -1,104.97 1,855.78 4.125 1,147.04 356.40 801.99 Pass-Major Risk 9,244.59 8,877.45 10,875.00 8,966.78 91.80 20.30 -159.96 -1,080.30 1,851.98 4.125 1,125.92 355.75 781.78 Pass-Major Risk 9,250.00 8,68248 10,900.00 8,965.83 91.80 20.28 -159.38 -1,055.90 1,846.68 4.125 1,105.81 354.90 762.72 Pass-Major Risk 9,255.00 8,887.11 10,925.00 8,964.94 91.80 20.28 -158.72 -1,031.77 1,840.19 4.125 1,086.60 354.03 744.60 Pass-Major Risk 9,260.75 8,692.42 10,950.00 8,964.21 91.80 20.25 -158.05 -1,007.71 1,833.44 4.125 1,067.78 352.97 726.96 Pass-Major Risk 9,267.07 8,698.23 10,975.00 8,964.08 91.80 20.24 -157.43 -983.30 1,828.07 4.125 1,048.45 352.49 70878 Pass-Major Risk 9,275.00 8,705.48 11,000.00 8,963.69 91.80 20.23 -156.87 -958.60 1,824.24 4.125 1,028.34 351.97 689.85 Pass-Major Risk 9.279.34 6,709.42 11,025.00 8,962.56 91.80 20.21 -156.33 -933.73 1,822.04 4.125 1,007.35 351.59 669.82 Pass-Major Risk 9,284.84 8,714.40 11,050.00 8,960.85 91.80 20.20 -155.82 -908.82 1,821.13 4.125 985.71 351.06 649.15 Pass-Major Risk 9,289.80 8,718.87 11,075.00 8,957.91 91.80 20.19 -155.33 -883.98 1,821.42 4.125 963.49 350.53 627.86 Pass-Major Risk 9,294.41 8,723.00 11,100.00 8,954.67 91.80 20.19 -154.87 -859.23 1,822.82 4.125 940.83 349.99 606.07 Pass-Major Risk 9,300.00 8,727.99 11,125.00 8,952.47 91.80 20.18 -154.44 -834.40 1,824.60 4.125 918.27 349.30 584.37 Pass-Major Risk 9,306.70 8,733.94 11,15000 8,951.64 91.80 20.19 -153.98 -809.43 1,825.47 4.125 89644 348.40 563.47 Pass-Major Risk 9,314.62 8,740.90 11,175.00 8,951.42 91.80 20.20 -153.44 -784.46 1,824.55 4.125 875.71 347.25 543.82 Pass-Major Risk 9,325.00 8,749.96 11,200.00 8,951.00 91.80 20.22 -152.83 -759.58 1,822.12 4.125 855.89 345.63 525.27 Pass-Major Risk 9,331.60 8,755.66 11,225.00 8,949.90 91.80 20.26 -152.06 -734.88 1,818.44 4.125 836.85 344.87 507.52 Pass-Major Risk 9,340.52 8,763.30 11,250.00 8,948.28 91.80 20.32 -15120 -710.48 1,813.30 4.125 818.91 34427 491.04 Pass-Major Risk 9,350.00 8,771.32 11,275.00 8,947.01 91.80 20.41 -150.24 -686.50 1,806.35 4.125 802.61 343.53 476.30 Pass-Major Risk 9,362.13 8,781.44 11,300.00 8,946.60 91.80 20.53 -149.27 -682.86 1,798.23 4.125 787.73 342.46 463.03 Pass-Major Risk 9,375.00 8,792.01 11,325.00 8,946.27 91.80 20.68 -148.24 -639.89 1,788.86 4.125 774.25 341.16 451.19 Pass-Major Risk 9,388.18 8,802.63 11,350.00 8,945.67 91.80 20.88 -147.13 -617.10 1,778.17 4.125 762.30 339.70 440.93 Pass-Major Risk 9,402.58 8,814.00 11,375.00 8,944.88 91.81 21.05 -146.00 -594.85 1,766.80 4.125 751.37 337.95 431.67 Pass-Major Risk 9,416.15 8,824.48 11,397.00 8,944.18 91.81 21.22 -145.01 -575.27 1,756.79 4.125 742.08 336.98 423.77 Pass-Major Risk,CC,ES,SF CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 6/18/2015 12:35:34PM Page 12 COMPASS 5000.1 Build 61 • BP • Irak.;= Travelling Cylinder Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-10 Project: Prudhoe Bay ND Reference: Mean Sea Level Reference Site: PB J Pad MD Reference: Kelly Bushing/Rotary Table @ 69.20usft (NORDIC 1) Site Error: 0.00 usft North Reference: True Reference Well: J-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore J-10B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: J-106 WP07 Offset ND Reference: Offset Datum I, Offset Design PB J Pad- J-25-J-25-J-25 Offset Site Error: 000 usft Survey Program: 38-GCT-MS Rule Assigned:Minor 1/10 Offset Well Error: 0.00 usft Reference Offset Semi Major Axis il Measured Vertical Measured Vertical Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N1-5 +EI-W Mob Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (% Nat) (usft) OW (unit) (usft) (usft) 10,075.00 8,977.03 11,659.00 8,909.44 92.22 27.34 23.78 753.67 1,973.83 5.000 437.97 11.91 437.55 Pass-Minor 1/10 10,081.58 8,977.03 11,650.00 8910.07 92.23 27.30 22.93 750.95 1,965.28 5.000 431.08 11.92 430.66 Pass-Minor 1/10 10,090.32 8,977.03 11,625.00 8,911.81 92.24 27.20 21.71 743.37 1,941.52 5.000 412.20 11.93 411.79 Pass-Minor 1/10 10,100.00 8,977.03 11,600.00 8,913.55 92.25 27.02 20.38 735.77 1,917.77 5.000 393.63 11.94 39321 Pass-Minor 1/10 10,108.89 8,977.03 11,575.00 8,915.30 92.26 28.82 19.12 728.10 1,894.04 5.000 375.33 11.95 374.91 Pass-Minor 1/10 10,118.73 8,977.03 11,550.00 8,917.04 9228 26.61 17.74 720.35 1,870.33 5.000 357.32 11.96 356.90 Pass-Minor 1/10 10,125.00 8,977.03 11,525.00 8,918.79 92.29 26.41 16.78 712.53 1,846.65 5.000 339.66 11.97 339.24 Pass-Minor 1/10 10,139.64 8,977.03 11,500.00 8,920.54 92.31 26.19 14.80 704.64 1,822.99 5.000 322.26 12.00 321.84 Pass-Minor 1/10 10,150.00 8,977.03 11,475.00 8,922.31 92.33 25.98 13.33 696.71 1,799.35 5.000 305.28 12.02 304.86 Pass-Minor 1/10 10,162.34 8,977.03 11,450.00 8,924.11 92.35 25.76 11.61 688.74 1,775.72 5.000 288.69 12.04 288.28 Pass-Minor 1/10 10,175.00 8,977.03 11,425.00 8,925.92 92.37 25.54 9.85 680.72 1,752.11 5.000 272.54 12.07 272.13 Pass-Minor 1/10 10,187.03 8,977.03 11,400.00 8,927.58 92.39 25.31 8.11 672.75 1,728.48 5.000 256.94 12.09 256.52 Pass-Minor 1/10 10,200.00 8,977.03 11,375.00 8,928.99 92.42 25.08 6.20 664.87 1,704.79 5.000 242.00 12.11 241.58 Pass-Minor 1/10 10,214.10 8,977.03 11,350.00 8,930.00 92.45 24.85 4.05 657.18 1,681.03 5.000 227.86 12.13 227.44 Pass-Minor 1/10 10,225.00 8,977.03 11,325.00 8,930.57 92.47 24.62 2.15 649.73 1,657.17 5.000 214.67 12.15 214.25 Pass-Minor 1/10 10,243.78 8,977.03 11,300.00 8,930.71 92.50 24.40 -0.83 642.48 1,633.25 5.000 202.35 12.17 201.93 Pass-Minor 1/10 10,259.50 8,977.03 11,275.00 8,930.55 92.54 24.19 -3.58 635.21 1,609.33 5.000 190.85 12.19 190.43 Pass-Minor 1/10 10,275.00 8,977.03 11,250.00 8,930.14 92.57 23.98 -6.44 627.84 1,585.44 5.000 18008 1221 179.67 Pass-Minor 1/10 10,292.47 8,977.03 11,225.00 8,929.48 92.61 23.78 -9.68 620.36 1,561.60 5.000 170.09 12.23 169.68 Pass-Minor 1/10 10,309.71 8,977.03 11,200.00 8,928.61 92.64 23.58 -13.02 612.77 1,537.79 5.000 160.93 12.24 160.51 Pass-Minor l/10 10,325.00 8,977.03 11,175.00 8,927.87 92.68 23.38 -16.14 805.15 1,513.99 5.000 152.60 12.25 152.18 Pass-Minor 1/10 10,345.75 8,977.03 11,150.00 8,927.22 92.72 23.17 -19.90 597.59 1,490.17 5.000 145.16 12.27 144.74 Pass-Minor 1/10 10,364.51 8,977.03 11,125.00 8,926.62 92.77 22.97 -23.39 590.12 1,466.32 5.000 138.76 12.27 138.35 Pass-Minor 1/10 10,383.70 8,977.03 11,100.00 8,925.90 92.81 22.77 -26 '582.781. .43 5.000 133,48 12.28 133.07 Pass-Minor 1/10 10,40325 8,977.03 11,075.00 8,925.03 92.86 22.56 -30. - 5 4 .51 5.000 129.36 12.28 128.94 Pass-Minor 1/10 10425.00 8,977.03 11,050.00 892402 9291 22.36 -34.1, 513.50` _ 3 .56 5.000 126.42 12.28 126.00 Pass-Minor 1/10 10,443.19 8,977.03 11,025.00 8,922.96 92.95 22.17 -37.27 561.49 1,370.58 5.000 124.50 12.28 124.08 Pass-Minor 1/10 10,483.40 8,977.03 11,000.00 8,921.99 93.00 21.99 -40.41 554.48 1,346.60 5.000 123.54 12.27 123.12 Pass-Minor 1/10 10,483.70 8,977.03 10,975.00 8,921.10 93.05 21.80 -43.32 547.48 1,322.62 5.000 123.50 12.26 123.08 Pass-Minor l/10 10,503.99 8,977.03 10,950.00 8,920.29 93.09 21.62 -45.97 540.46 1,298.64 5.000 124.37 12.24 123.96 Pass-Minor l/10 10,525.00 8,977.03 10,925.00 8,919.54 93.14 21.43 -48.49 533.29 1,274.70 5.000 126.02 12.23 125.60 Pass-Minor 1/10 10,546.83 8,977.03 10,900.00 8,918.85 93.19 21.24 -49.37 525.91 1,250.83 5.000 128.33 12.23 127.91 Pass-Minor 1/10 10,579.72 8,977.03 10,875.00 8,918.23 93.27 21.04 -45.43 518.32 1,227.01 5.000 129.69 12.37 12927 Pass-Minor 1/10 10,612.66 8,977.03 10,850.00 8,917.86 93.36 20.86 -41.84 510.58 1,203.25 5.000 129.35 12.50 128.94 Pass-Minor 1/10 10,645.33 8,977.03 10,825.00 8,917.13 93.45 20.68 -38.60 502.91 1,179.46 5.000 127.54 12.65 127.12 Pass-Minor 1/10 10,677.47 8,977.03 10,800.00 8,916.68 93.55 20.50 -35.79 495.31 1,155.65 5.000 124.32 12.79 123.90 Pass-Minor 1/10 10,708.82 8,977.03 10,775.00 8,916.22 93.65 20.32 -33.48 487.79 1,131,81 5.000 119.77 12.93 119.36 Pass-Minor 1/10 10,739.16 8,977.03 10,750.00 8,915.85 93.75 20.16 -31.79 480.33 1,107.95 5.000 114.02 13.07 113.60 Pass-Minor 1/10 10,768.32 8,977.03 10,725.00 8,915.55 93.85 19.99 -30.84 472.91 1,084.08 5.000 107.18 13.19 106.76 Pass-Minor 1/10 10,796.18 8,977.03 10,700.00 8,915.34 93.95 19.83 -30.83 465.54 1,060.19 5.000 99.47 13.31 99.05 Pass-Minor 1/10 10,822.64 8,977.03 10,675.00 8,915.21 94.05 19.66 -32.01 45821 1,036.29 5.000 91.17 13.41 90.75 Pass-Minor 1/10 10,846.16 8,977.03 10,650.00 8,915.12 94.13 19.47 -36.32 450.91 1,012.38 5.000 82.74 13.49 82.33 Pass-Minor 1/10 10,866.19 8,977.03 10,625.00 8,915.05 94.21 1928 -45.42 443.60 988.47 5.000 75.55 13.53 75.13 Pass-Minor 1/10 10,887.11 8,977.03 10,600.00 8,914.98 94.29 19.09 -55.19 436.29 964.57 5.000 70.02 13.57 69.61 Pass-Minor 1/10 10,908.89 8,977.03 10,575.00 8,914.92 94.37 18.89 -65.31 428.99 940.86 5.000 86.14 13.59 65.72 Pass-Minor 1/10 10,931.48 8,977.03 10,550.00 8,914.87 94.46 18.70 -75.36 421.68 916.75 5.000 83.74 13.61 83.32 Pass-Minor 1/10 10,957.21 8,976.73 10,525.00 8,914.81 94.56 18.50 -83.33 414.38 892.84 5.000 62.29 13.73 61.87 Pass-Minor 1/10 CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 6/18/2015 12:35:34PM Page 13 COMPASS 5000.1 Build 61 • • BP Waal bPTravelling Cylinder Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB J Pad MD Reference: Kelly Bushing/Rotary Table @ 69.20usft (NORDIC 1) Site Error: 0.00 usft North Reference: True Reference Well: J-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore J-10B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: J-10B WP07 Offset TVD Reference: Offset Datum Offset Design PB J Pad- J-25-J-25-J-25 Offset Site Error 0-00 usft 1 Survey Program: 38-GCT-MS Rule Assigned:Minor 110 Offset Well Error 0.00 usft Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toolface* Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth *NI-S *E/-W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) lusff) (usft) (°) (usft) (usft) (in) (usft) (usft) (usft) 10,984.49 8,974.99 10,500.00 8,914.63 94.67 18.30 -90.37 407.11 868.92 5.000 60.63 13.88 60.21 Pass-Minor 1/10 11,011.54 8,971.74 10,475.00 8,914.35 94.78 18.10 -97.83 399.88 844.99 5.000 58.70 14.00 58.28 Pass-Minor 1/10 11,038.21 8,967.04 10,450.00 8,913.94 94.89 17.90 -105.98 392.68 821.05 5.000 56.65 14.10 56.23 Pass-Minor 1/10 11,064.37 8,961.02 10,425.00 8,913.51 94.99 17.73 -115.02 385.58 797.09 5.000 54.62 14.16 54.20 Pass-Minor 1/10 11,089.88 8,953.81 10,400.00 8,913.19 95.10 17.57 -125.18 378.73 773.05 5.000 52.76 14.19 52.34 Pass-Minor 1/10 11,114.61 8,945.59 10,375.00 8,912.99 95.20 17.40 -136.58 372.12 748.94 5.000 51.54 14.20 51.13 Pass-Minor 1/10,CC 11,138.43 8,936.54 10,350.00 8,912.92 95.29 17.24 -149.16 365.76 724.78 5.000 51.56 14.18 49.79 Pass-Minor 1/10 11,161.25 8,926.84 10,325.00 8,913.03 95.38 17.09 -162.36 359.70 700.51 5.000 53.33 14.14 48.34 Pass-Minor 1/10,ES,SF 11,182.97 8,916.71 10,300.00 8,913.34 95.46 18.92 -175.33 353.89 678.19 5.000 57.33 14.09 49.44 Pass-Minor 1/10 11,203.53 8,906.33 10,275.00 8,913.88 95.54 16.76 172.83 348.21 651.85 5.000 63.84 14.02 53.71 Pass-Minor 1/10 w Fna CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 6/18/2015 12:35:34PM Page 14 COMPASS 5000.1 Build 61 • BP • rs,u 0 bp Travelling Cylinder Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-10 Project: Prudhoe Bay ND Reference: Mean Sea Level Reference Site: PB J Pad MD Reference: Kelly Bushing/Rotary Table @ 69.20usft (NORDIC 1) Site Error: 0.00 usft North Reference: True Reference Well: J-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore J-108 Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: J-10B WP07 Offset ND Reference: Offset Datum Offset Design PB J Pad- J-25-J-25A-Plan#6 Offset Site Error: 0 00 u55 Survey Program: 38-OCT-MS,8912-MWD,8950-MWD Rule Assigned:Major Risk Offset Well Error: 0.00 vet Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Toofface+ Offset Waltham Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth 411114 +W-yy Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (•) (usft) (usft) (in) (usft) (usft) (usft) 11,000.00 8,973.31 11,025.00 10,174.08 94.73 24.38 74.36 769.64 673.33 7.062 1,265.95 390.87 1,123.71 Pass-Major Risk 11,000.00 8,973.31 11,050.00 10,191.36 94.73 24.65 74.10 779.91 688.19 7.062 1,283.35 391.51 1,139.52 Pass-Major Risk 11,000.00 8,973.31 11,075.00 10,208.64 94.73 24.91 73.85 790.19 703.06 7.062 1,301.00 392.15 1,155.61 Pass-Major Risk 11,012.95 8,971.53 11,000.00 10,156.79 94.79 24.11 74.83 759.37 658.48 7.062 1,248,57 390.45 1,107.04 Pass-Major Risk 11,025.00 8,969.55 10,900.00 10,087.56 94.84 23.04 75.79 718.39 599.09 7.062 1,181.48 388.11 1,045.49 Pass-Major Risk 11,025.00 8,969.55 10,925.00 10,104.88 94.84 23.31 75.48 728.62 613.93 7.062 1,197.88 388.75 1,060.17 Pass-Major Risk 11,025.00 8,969.55 10,950.00 10,122.19 94.84 23.58 75.19 738.87 628.78 7.082 1,214.57 389.38 1,075.17 Pass-Major Risk 11,025.00 8,969.55 10,975.00 10,139.49 94.84 23.84 74.90 749.12 643.63 7.062 1,231.54 390.02 1,090.48 Pass-Major Risk 11,038.48 8,966.99 10,875.00 10,070.24 94.89 22.78 76.11 708.16 58425 7.062 1,165.12 387.71 1,029.69 Pass-Major Risk 11,050.00 8,964.50 10,800.00 10,018.22 94.94 21.98 77.12 677.51 539.75 7.062 1,117.73 386.02 986.87 Pass-Major Risk 11,050.00 8,964.50 10,825.00 10,035.57 94.94 22.25 76.77 887.72 554.58 7.062 1,133.26 386.85 1,000.49 Pass-Major Risk 11,050.00 8,964.50 10,850.00 10,052.91 94.94 22.51 76.43 697.93 569.41 7.062 1,149.13 387.28 1,014.48 Pass-Major Risk 11,060,58 8,961.98 10,775.00 10,000.87 94.98 21.72 77.49 667.31 524.92 7.062 1,102.37 385.57 972.53 Pass-Major Risk 11,066.32 8,960.51 10,750.00 9,983.51 95.00 21.48 77.86 657.11 510.10 7.082 1,087.30 385.04 958.95 Pass-Major Risk 11,075.00 8,958.17 10,700.00 9,948.78 95.04 20.93 78.85 636.74 480.46 7.062 1,057.99 383.94 932.99 Pass-Major Risk 11,075.00 8,958.17 10,725,00 9,966.15 95.04 21.19 78.25 646.92 495.28 7.062 1,072.51 384.57 945.43 Pass-Major Risk 11,084.18 8,955.53 10,675.00 9,931.40 95.07 20.67 79.07 626.57 465.64 7.062 1,043.72 383.48 920.03 Pass-Major Risk 11,090.33 8,953.67 10,650.00 9,914.01 95.10 20.41 79.49 816.40 450.83 7.062 1,029.77 382.96 907.68 Pass-Major Risk 11,100.00 8,950.59 10,800.00 9,87922 95.14 19.89 80.39 598.09 42122 7.062 1,002.77 381.89 884.23 Pass-Major Risk 11,100.00 8,950.59 10,625.00 9,896.62 95.14 20.15 79.93 606.24 436.02 7.062 1,016.12 382.51 895.37 Pass-Major Risk 11,109.39 8,947.42 10,575.00 9,861.81 95.18 19.63 80.86 585.94 406.42 7.062 989.73 381.44 872.58 Pass-Major Risk 11,115.95 8,945.11 10,550.00 9,844.40 9520 19.37 81.35 575.80 391.62 7.062 977.02 380.94 861.52 Pass-Major Risk 11,125.00 8,941.77 10,500.00 9,809.56 95.24 18.85 82.36 555.54 362.03 7.062 952.67 379,87 840.82 Pass-Major Risk 11,125.00 8,941.77 10,525.00 9,826.98 95.24 19.11 81.85 565.67 376.83 7.062 964.67 380.48 850.58 Pass-Major Risk 11,136.21 8,937.43 10,475.00 9,792.12 95.28 18.60 82.89 545.42 347.24 7.062 940.98 379.45 830.30 Pass-Major Risk 11,150.00 8,931.74 10,400.00 9,739.78 95.33 17.83 84.57 515.11 302.90 7.062 908.34 377.87 802.80 Pass-Major Risk 11,150.00 8,931.74 10,425.00 9,757.24 95.33 18.09 84.00 525.21 317.68 7.062 918.78 378.47 811.04 Pass-Major Risk 11,150.00 8,931.74 10,450.00 9,774.68 95.33 18.34 83.44 535.31 332.46 7.062 929.76 379.07 819.93 Pass-Major Risk 11,164.61 8,925.33 10,375.00 9,722.32 95.39 17.58 85.16 505.02 288.12 7.062 898.13 377.51 792.84 Pass-Major Risk 11,175.00 8,920.53 10,325.00 9,687.38 95.43 17.08 86.39 484.86 258.58 7.062 879.15 376.49 776.09 Pass-Major Risk 11,175.00 8,920.53 10,350.00 9,704.86 95.43 17.33 85.77 494.93 273.35 7.062 888.43 377.08 783.83 Pass-Major Risk 11,186.92 8,914.78 10,300,00 9,669.90 95.47 16.83 87.02 474.79 243.81 7.062 87025 378.08 767.29 Pass-Major Risk 11,200.00 8,908.16 10,250.00 9,634.92 95.52 16.33 88.33 454.67 214.29 7.062 853.86 375.12 751.35 Pass-Major Risk 11200.00 8,908.16 10,275.00 9,652.42 95.52 16.58 87.67 464.72 229.05 7.062 861.88 375.70 758.60 Pass-Major Risk 11,210.03 8,902.88 10,225.00 9,617.42 95.56 16.08 89.00 444.62 199.53 7.062 846.33 374.89 743.23 Pass-Major Risk,CC,ES,SF CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 6/18/2015 12:35:34PM Page 15 COMPASS 5000.1 Build 61 • BP • Pik® 0 bp Travelling Cylinder Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-10 Project: Prudhoe Bay ND Reference: Mean Sea Level Reference Site: PB J Pad MD Reference: Kelly Bushing/Rotary Table @ 69.20usft (NORDIC 1) Site Error: 0.00 usft North Reference: True Reference Well: J-10 Survey Calculation Method: Minimum Curvature Welt Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore J-106 Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: J-1 OB WP07 Offset TVD Reference: Offset Datum Reference Depths are relative to Kelly Bushing/Rotary Table @ 69.20 Coordinates are relative to:J-10 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927(Exact solution),Alaska Zone 04 Central Meridian is 150°0'0.000 W Grid Convergence at Surface is:1.10° Ladder Plot I I 1400 1 j I I I ) 1050 i �� c 1 I I I o I I IL: m a. J J i J J J J ___ –_ I 1 1 1 I �\ U) 1 1 2 r i I i '� 1 I a) 700` I 1 a) 1 I I I 1 U I iO 1 ! 2J J I J I J____.� ' J J J - - a) I 0 I i i 350— - III ,I I f_ 1 _J- -_-1 1\ __J____ 0 2000 4000 6000 8000 10000 12000 Measured Depth LEGEND —X- J-10,J-10,J-10 V1 -e- J-01,J-01B,J-01BV7 -9- J-16,J-16BPB1,J-16BPB1 VO -str- J-10,J-1OA,J-10AV3 —0- J-01,J-01B,Plan#7 V4 $ J-25,J-25,J-25 V3 F-09,F-09C,F-09C VO -&-ii J-16,J-16B,J-16B VO J-25,J-25A,Plan#6 V3 CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 6/18/2015 12:35:34PM Page 16 COMPASS 5000.1 Build 61 • BP • ri�r 0 bp Travelling Cylinder Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-10 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB J Pad MD Reference: Kelly Bushing/Rotary Table @ 69.20usft (NORDIC 1) Site Error: 0.00 usft North Reference: True Reference Well: J-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore J-10B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: J-10B WP07 Offset TVD Reference: Offset Datum Reference Depths are relative to Kelly Bushing/Rotary Table @ 69.20 Coordinates are relative to:J-10 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927(Exact solution),Alaska Zone 04 Central Meridian is 150°0'0.000 W Grid Convergence at Surface is:1.10° Separation Factor Plot I I 9.00— I _ - 1 I i O 6.00— i- LL. c i I i 0 O I i i Q a) I I I 1 ? I !) i a00— J. • 1 1 I • 1 I i 0.00 I I I I 0 2000 4000 6000 8000 10000 Meowed Depth LEGEND -j- J-10,J-10,J-10V1 -e- J-01,J-01B,J-01BV7 -8- J-16,J-16BPB1,J-16BPB1 VO -fi- J-10,J-10A,J-10AV3 -4-- J-01,JO1B,Plan#7 V4 -9- J-25,J-25,J-25 V3 F-09,F-09C,F-09C VO J-16,J-16B,J-16BVO J-25,J-25A,Plan#6 V3 CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 6/18/2015 12:35:34PM Page 17 COMPASS 5000.1 Build 61 • BP • IN11111 0 bp Travelling Cylinder Report BAKER HUGHES Company: North America-ALASKA-BP Local Co-ordinate Reference: Well J-10 Project Prudhoe Bay ND Reference: Mean Sea Level Reference Site: PB J Pad MD Reference: Kelly Bushing/Rotary Table @ 69.20usft (NORDIC 1) Site Error: 0.00 usft North Reference: True Reference Well: J-10 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore J-10B Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: J-10B WP07 Offset ND Reference: Offset Datum Reference Depths are relative to Kelly Bushing/Rotary Table©69.20 Coordinates are relative to:J-10 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927(Exact solution),Alaska Zone 04 Central Meridian is 150°0'0.000 W Grid Convergence at Surface is:1.10° Travelling Cylinder Plot 0 153 3319_,---------- 0 1350 112 9625 300 / 900 60 / .675 \ 954 4 9375 11075 0709 270 -- it ----- - -- -- _ � _ _ 11210 - -----_ 90 X45 gxx 67 240 9225 ' 120 !2:7 NN'-,,..„_ 11214 ______7 , i 50 107 210-'-� 150 1575 180 Azimuth from North[O]vs Centre to Centre Separation[750 usft/in] LEGEND -94- J-10,J-10,J-10 V1 -G- J-01,,101B,J-01BV7 $ J-16,J-16BPB1,J-16BPB1 VO -itt- J-10,J-10A,J-10A V3 -4- J-01,J-01 B,Plan#7 V4 -8- J-25,J-25,J-25 V3 F-09,F-09C,F-09C VO -A- J-16,J-16B,J-16B VO J-25,J-25A,Plan#6 V3 CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 6/18/2015 12:35:34PM Page 18 COMPASS 5000.1 Build 61 0 * - i r1 I I tor \ I 1 I i 1 O 1 > i U 1 OQ .11,101 ' I Uf U �e I mn r rm as 1 ,R�b/ 1 0:41 ElOt § ., . r o °. IC* \ I M ;C. .�.4_ • • 1 11_,4 .1 1 om ry hos 01 3.13.131131316.14s I w '';1 1 2 1 1 6 Y 12 `%` 44.424 - f Gwg'rp 4 I 1 Y O 1 I . ,. .1 O I a a I O III . I., J V v I II ,. I I.O • Z '` I I _ M.. 1 Z = I 4 V .. 1 O I i 19 F, I- x o I 1 U LI! 1 I I al5nese� I U • Jw m1 1_ _ , I,\ I re C,) 1 I 1 I 1 \ o 1 m * A II ! 1 \ w.1 lr1oLII S f z 1 W' _ ; i; I�Y Z1, \ . ce CO In o I f F Z � a� 2• • �. o, ■— 0 1 w -2 f gg I •• 511 v .:, g 11 g 0 ICI :I c4 m s _ _ S • * •..• •. , I Ha s r s r•• g�a0 i\ 1 ..5' g\ 1 rorli 1 = .., \ .,„ 1 i— 1 / v 1 g ne,' r 1 U '_ € I ,1 a 1� u 0 00 \I —_% 1 U I PI at 1ira: ..":" .1 U Ualk I -4'Z 0 m s 1 ; �g s , C 0 M II r- o I 2� Ia 22 U I of ce 1 r Y E v ICRI mi ,.... u I ..I .N 1 .. .. u• i 1 1 a • OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. • TRANSMITTAL LETTER CHECKLIST WELL NAME: T4 1 J /06 PTD: l /2— /Development Service _Exploratory Stratigraphic Test Non-Conventional FIELD: rt(J t L. POOL: (�. r ^( Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- - - - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - ) from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10'sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a)authorizes the AOGCC to specify types of well logs to be run. hi addition to the well logging program proposed by (Company Name) in the attached application,the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion,suspension or abandonment of this well. Revised 2/2015 • • ❑❑ , , , N , , , , a) a , � , , . , , , a) E , ' . , , , a) c , O , T 3' o o c' c @ 0 WfL 03 O a) , o O' E O X �: m. o , (0 M' aY C.) Oa. C• o . aY . . a. � O, co ami' , 3. C, a �' 7• (n c' on o N (U m. g -' Y, P2 Li? C u, NC N; y, 7. a). 4 coa) ' a H2. 0' : 4 tn: M a). M, N m W, 0 u1 N , , , O 0 o, d (0 0 co m� ) E. co, W O. u> N• p, T 0 N CO Q M N c 2 7h, ,, = = a) 0310 E N .0 0) O S y. Y' 3' ao o, D Ca., H, o o. m as. 3. m in N 3 •9; co "0 c. T N. co f0 a Q , m'. 3. OU, a), c c. c, co; ' a m EW' a, O, co, co co a) 4- .d (U N� V co C t7/1 CO O O' o • co O' 0. 0' > V)' as �, a� co. Z 2 -0 V' ay a) •V N' NO' 'O t N a) 3 1g N. .zr a) o �� M. C. 0� C ,co, ,a -70. , .c o' V, X' co,ac) CO• C• 4)' Z CC O' 0- O' 0' 7 7' O. , O 1- C, o a. N, a. (0. 0' a. 0 0 0 Ucnco a i as < I - a a a , , w , 0 Q UN,, N)' N N N), N, aN)' N UUN, Q Q Q Q Q Q Q Q N), N, U) N, N), Q a)N, U) U) 8 it)' UQ o N Q Q a z >- >- >- >- >- >- >- >- >- >- >- >- z Zz z zz zZ >- >- >- >- >- z >- >- >- >- >- >- zz } ZZz a) mow..' T : a as C. a), E. 3 E. y o. V, Z. m E o, c c r, . p. a o co 1w U Z` C *-7. ; E. y / O ...-= (0 co' < 0) > E a V1 W co. a). N• N. N, 0 0 ( a 7 3, '"' c as N N 0 �, N U co' N, a) C O. N' 7 ' > -p' a). va 1 >- < C9 •� Q N L. V. a o ' 7 0; 'c a 0' •O: .- 4 a -00 a w 7 co m z = w, rn ` Z, y co 7 3, m o < �' 0) r, °,' C, N 0' 0. o. 'n' 7 ' Q' cu co co a0i' a) LLl - a 0 C: a' 0 N' •C. '0. a). N, a D O. C. 0, m, 0. 0 0) a)' a . , C' c N c V o L- 0 1 Y _ n, .J > C7 c, U i- C O co w a N , w N t a C E; E •-' o, c; c, E o, o c, N, �, c c a), a, co 0 D .0 , N' 0 O 3 7 •,- V N, YO' 0 0 a)• O E f0 •@, .4,1,.._' Q. 2 .0' 0) >: 0 0) 0 N' 0• to o, 0 0 o - .0 0 O' o, C N m, ' o, Z' o' E. 7 ' o' o' O _c m, 3 N E a Q 1. D' .g. m c .o m. o, N' w' w' a, CO o N •o a 5 o a) 2 ) 0) o N' ci °a 3' o' c 0 - ' c E �, 0, 03 is 3'. 3. a). 1, v N' '�, . 3. m' a co as co 0 4 N coi 4 ' N O' 3; m' c.Ta. °) o' W U 0' Z •� 'o ' ' a)' -0, > N, ., p. .) U' O T �' a) O' 0 D- 0 0' O L' 0 0 O• c� �, °0 -0, > 0, 4 a� •o� 0 N. O. CO c '0. N. a), Ci_ c a a, - a`) a`) CO ao, o o. a' a' a c �' c' 5 O o. aa) aa) _ v' a, o U' m' E rn o' .' cn ° a' c 0 w. o US < .0 a a). a a o) N' „' a co co a L' N' co; of 0- N co N CO. co CU 0' N, `g E' C, 0 3' N. :D N o. N' c •p U. l0. E. 2: 2: f6• 3' 0: N (0. .G O C, 7' 7' N• (0. �: 0, •p. S. C .0. •N. O. a W O :° N C C a a a) N T ' a) a) a) 3. r.0 .0 p) c C cr 0r N C C• a) 7 a «L.' 2 p 7 d o 0 a)� >, "• a). it -) t6 .0 - V p -0 0 • C 0,, .0 a a V a) V) 'N• 0. a) > .0? c0 L, a). N N )= 0 U O, C, co C, E a .a) a) a) N o L C c • .a) U' c co "O •O o N = 3. :0, O. N c o. N 03. C a). c. 0, a) X aY E N •0 t0 3 7 a)' O U t6 (0' V' a)' may,' = y 7 '0 N (0 C U (0 N (6 V c F- w w c cosi 'ELL') 0 @ o o o v' co a c, a) o 'o. CO $, m r ua a E •3 a E , _0 •o; .5 UI a •• o' o o •6 •0 E m ..g.: E E 0' �'' -0: a• $. v' m H- I- F-, c o 2 7 >' c wa' d 'o`' co t' .E m L 2' -' 0 A Jam E o• - - a) a) a) c 3 c, c. `t m a) o. a v. as c. m :"1. 0 c a)' m a) 7 v 4 O. a) m CO a) - `Y o, o. 7 2, 2; 2 as v. o v ''0 '�; O O. .c o a) m co m a) o, 1 0 - >` a _1 D �; � � cn .. O o a a U �; ¢' fa_ z U co 0 c..) U U Q �; ¢ . o m co o 5 � 2; a o co co O LU O. O ,- N M C 10 O CO c,2 O N M a an O N- M O O N M v )n (0 )'- M 0) E ,- N M M (p h M O N N N N N N_N N N N M M M_.M M M M M M M in 2 O c a) O a) 0 a) O0 ° 0 C 0 O a) 0 CO 0 M O o) (• ' W c (fl ao)•E (_`_ J N •N a) O O o J . �* EE -1 o a 0 W o E a a) o. o au_ a Q < ( w a > O Q