To: Well File: Pmdhoe Bay Unit 5-21 Permit # 89-0090
Re:
Administrative Abandonment Action
Pmdhoe Bay Unit 5-21 Permit # 89-0090
State of Alaska
Oil and Gas Conservation Commission
January 12, 1999
This memo will remain at the front of the subject well file.
Well 5-21 was replaced by 5-21A (permit # 98-0118, APl # 50-029-21969~6i) ¢/h~'the permit was
approved 7/10/98. The replacement well incorporates a deepening operation of the existing well
bore. This extension, along with the original hole, will be used for production of hydrocarbons. A
review of both well files indicates administrative abandonment of the originating well bore is
appropriate according to current AOGCC procedures for wells where additional permitted extension is
drilled from an existing well bore. ': ·
20 AAC 25.005(e) requires a Permit to Drill for each hole drilled below the conductor unless drilled
to straighten the original hole, sidetrack junk, or correct mechanical difficulties. In addition, AOGCC
data bases require each conductor has only one permit number and APl number. Administrative
abandonment of the original permit only eliminates duplication in the databases. Information for the
original well and its replacement will be maintained in their respective files.
The operator has been notified of this action. All furore correspondence with the AOGCC should
reflect the new permit number, API number and well data.
Statistical Technici~,~.~¢~.v. t,-,, [wv~4,,~eservoir Engineer
Petroleum Geologis~~~o~issione~'~
TONY KNOWLE$, GOVERNOR
ALASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
January 12, 1999
Mr. Bruce Smith
Arco Alaska Inc.
P O Box 100360
Anchorage, AK 99510-0360
Re:
Administrative Abandonment Action
Prudhoe Bay Unit 5-21 Permit # 89-0090
Dear Mr. Smith,
Well 5-21 was replaced by 5-21A (permit # 98-0118, APl # 50-029-21969-01) when the permit was
approved 7/10/98. The replacement well incorporates a deepening with the existing well bore. The
extension, along with the original hole, will be used for production of hydrocarbons. A review of both
well files indicates administrative abandonment of the originating well bore is appropriate according to
current AOGCC procedures for wells where additional permitted extension are drilled from an existing
well bore.
20 AAC 25.005(e) requires a Permit to Drill for each hole drilled below the conductor unless drilled to
straighten the original hole, sidetrack junk, or correct mechanical difficulties. In addition, AOGCC data
bases require each conductor has only one permit number and APl number. Administrative abandonment
of the original permit only eliminates duplication in the databases. Information for the original well and
its replacement will be maintained in their respective files.
Please notify other cognizant personnel in your organization so that the well will be correctly identified
on subsequent reports and applications submitted to the Commission.
Sincerely,
Steve McMains
Statistical Technician
AOGCC
cc: Bob Wilkes
I. Status of Well
' ~ """~ STATE Of ALASKA ~' ~
ALASKA OIL AND GAS CONSERVATION coMMIsSION ~ ~t t ~ ~ i'~ ~
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Classification of Service Well
OIL ~ GAS ~ SUSPENDED i~ ABANDONED ~-] SERVICE []
2 Name of Operator
ARCO Alaska, Inc.
3. Address
P. 0. Box 100360, Anchorage, AK 99510
4. Location of well at surface
1968' FSL, '1243' FWL, Sec.32, TI'IN, R'ISE, UH
At Top Producing Interval
'1357' FSL, '1683' FWL, Sec.32, TllN, R'ISE, UN
At Total Depth
724' FNL, 2319' FEL, Sec. 5, T'ION, R'ISE, UM
5. Elevation in feet (indicate KB, DF, etc,) [ 6, Lease Designation and Serial No.
RKB 67' J ADL 28329
12. Date Spudded I13. DateT.D. Reached 14. Date Comp.,Susp. or Aband. 115. Water Depth, if offshore 116, No. of Completions
I
I
08/23/89
J 09/25/89 ~ /O/'-("/~"? I N/A ,eetMSL } .,
where
17. Total Depth (MD+TVD) lis.mug Back Depth (MD+q'VD) 19. Directional Survey I 20. Depth SSSV set I 21. Thickness of Permafrost
'I 'I 300 'MD/9044 'TVD'l Open Hole YES [] NO [] [ 2040' feet MD 'I 1900' (anorox)
22. Type Electric or Other Logs Run
D IFL/Temp/Z-Den/GR; CHT/Temp/0R/RFT: CBT/CET/CR: MWD: CCL/GR; CAI
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP I BOTTOM
20" 9~ _S# H-~0 Surf } '!'! 0'
'13-3/8" 72_O,~ . K-55/I-~0 Surf 3000'
9-5/8" /-I- 7. C)~ 1-80 Surf ! 867~'
7" 29.0# L-R0 8_'353' [ 10200'-.
24. Perforations open to Production (MD+TVD of Top and Bottom and
interval, size and number)
HOLE SIZE CEMENTING RECORD
30" 2150 ~ Pclc;¢t
!7-!/2" !600 ~,, CS !!I & 500 ~ ¢'i
25. TUBING RECORD
Slotted Liner Completion
7. Permit Number
89-90
8. APl Number
50- 029-21969
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
5-2'1
11. Field and Pool
Prudhoe Bay Field
Prudhoe Bay 0ii Pool
AMOUNT PULLED
SIZE DEPTH SET (MD) PACKER SET (MD)
4½"/3½" 9719' 9720'
26. ACID, FRACTURE, CEMENT SOUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
Plug (~ 3186'
Plug @ 7541'
P1 ucj (~ 6950 '
940 sx cmt
775 sx cmt
1800 sx ~m~
27J',1/A
PRODUCTION TEST
Date First Production
Date of Test
Hours Tested
F Iow Tubing Casing Pressure
Press.
28.
J Method of Operation (Flowing, gas lift, etc.)
tPRODUCTION FOR IOIL-BBL GAS-MCF
TEST PERIOD ~ J
CALCULATED i~ J OIL-BBL GAS-MCF
24.-HOUR RATE '-~,l
CORE DATA
WATER-BBL
WATER-BBL
CHOKE SIZE JGAS-OILRATIO
OIL GRAVITy-APl (corr}
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chil3s.
None
.(Dani) WC6/073
Form 10-407
Rev. 7-1-80
CONTINUED ON REVERSE SIDE
Submit in duplica'
29'i , 30.
NAME
Top Sadlerochit
Base 5adlerochi
GEOLOGIC MARKERS
MEAS. DEPTH
8704'
9980'
TRUE VERT. DEPTH
8494 '
903 9 '
FORMATION TESTS
Include interval tested, I~ressure data, all fluids recovered and gravity,
GOR, and time of each phase.
See attached for RFT Data
31, LIST OF ATTACHMENTS
MWD (2 copies), Wel~ History
32. t hereby certify that the foregoing is true and correct to the best of my knowledge
! NST R UCT IONS
Dri~ing Analyst
Date
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1: Classification of Service Wells:' Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is' used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: if this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21: Indicate whether from. ground level (G L) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: if no cores taken, indicate "none".
Form 10-407
RFT DATA for 5-21
Depth
3635
3860
4276
4543
4522
4651
4650
4734
4946
5015
5045
5245
5380
5482
5680
5770
5892
6050
6072
6105
6211
6288
6428
6510
6620
4540
Hydro-
Pressure
(psi)
1834
1942
2151
2281
2272
2334
2333
2375
2480
2513
2526
2627
2693
2742
2838
2883
2942
3019
3030
3047
3101
3139
3208
3249
3304
2295
Shut-In
Pressure
,(.ps i )
1655
1721
1897
2197
2093
2269
2065
2091
2213
2256
2260
2419
2429
2497
2674
2718
2841
2944
2952
2951
2885
2875
2960
3011
3043
2167
ARCO Oil and Gas Company
Well History - Initial Report - Daily
Instructions: Prepare and submit the "Initial Report" on the first Wednesday after a well ~s spudded pont ~orKover operations are started.
~Daiiy wOrl( prior to spuctdmg should be summ.arized on the form giving reclusive dates I .
Oistr~ct ARCO ALASKA INC. ICounty par,snNORTHOr oorougnSLOPE Ii State
Fieid Lease or Unit
PBU ADL: 28329 DS5-21
Auth. or W.O. no. /TM
AS3102 DRILL & COMPLETE
API: 50-029-21969
well no.
Operator ARCO W I
A~CO 22. 0000
Spudded or W.O. begunsPUD 1Date 08/23/89 [Hour 0930 ['iRS IP ............ W.O
Date and depth Complete record for each day reported
as of 8:00 a.m. NABORS 28E
08/23/89 (
TD: 110'(
SUPV:RWO
08/24/89 (
TD: 1067'(
SUPV:TBJ
08/25/89 (
TD: 2875' ( 1
SUPV:TBJ
.) MIX SPUD MUD, RU MW: 8.6 VIS:200
.10) MIRU. MIX SPUD MUD.
~)
;57)
I)
t08)
DAILY:S66,150 CUM:$66,150 ETD:S66,150 EFC:$3,300,000
UNPLUGGING FLOW LINE MW: 9.3 VIS:236
SPUDDED 17.5" HOLE @ 0930 HRS 8-23-89. DRILLED TO 534' &
TRIPPED FOR BIT ~2. TIH. DRILLED TO 1067'.
DAILY:S69,617 CUM:$135,767 ETD:S135,767 EFC:$3,300,000
DRILLING MW: 9.2 VIS: 86
REPAIR FLOWLINE JETS. DRLD TO 1159' MD. UNPLUG FLOWLINE
JETS. DRLD AND SURV TO 2875' MD. SURV: 1/2 DEG @ 2485'.
DAILY:S39,666 CUM:$175,433 ETD:Si75,433 EFC:$3,300,000
08/26/89 (
TD: 3010'(
SUPV:TBJ
08/27/89 (
TD: 3010'(
SUPV:TBJ
08/28/89 (
TD: 3345'(
SUPV:TBJ
08/29/89 (
TD: 3148'(
SUPV:TBJ
08/30/89 (
TD: 4688' ( 1
SUPV:TBJ
,)
o)
;)
~35)
~)
0)
)
40)
WELDING ON CSG HEAD 13-3/8"@ 3000' MW: 9.4 VIS: 50
DRILLED TO 3010'. TOM. RAN 13-3/8" CASING TO 3000' AND
CMTD W/1600 SX CS III & 600 SX CLASS G. ND DIVERTER.
PERFORMED TOP JOB W/200 SX CS II. NU WH.
DAILY:S188,742 CUM:$364,175 ETD:SI75,433 EFC:$3,488,742
DRILLING FLOAT COLLAR 13-3/8"@ 3000' MW: 8.5 VIS: 0
NU WH & BOPE. TSTD BOP£ TO 500 & 5000 PSI, OK. TIH.
DRILLED OUT CMT F/ 2893' - 2906'.
DAILY:S150,029 CUM:$514,204 ETD:S514,204 EFC:$3,300,000
WOC 13-3/8"@ 3000' MW: 8.5 VIS: 28
DRLD CMT & 10' OF NEW HOLE. PERFORMED LOT TO 11.4 PPG EMW.
DRILLED TO 3156''. PERFORMED LOT TO 10.6 PPG EMW. DRILLED
TO 3345'. LOST 70 BBLS OF MUD. TOH W/BIT & PU MULE SHOE.
SPOTTED 550 SX CMT. TOH. TIH W/BIT TO 2825'. WOC.
DAILY:S65,337 CUM:$579,541 ETD:S579,541 EFC:$3,300,000
FILLING HOLE, LOSING MUD 13-3/8"@ 3000' MW: 8.8 VIS: 28
WASHED F/2825' - 3095'. TAGGED MED HARD CMT. TESTED FORM
TO 9.7 PPG EMW. TOH. TIH W/5" MULE SHOE TO 3093'. SPOTTED
390 SX CMT. TOH. WOC. TIH W/ BIT. TAGGED CMT @ 2759'.
DOC TO 3148'. LOSING 20 BPH.
DAILY:S74,725 CUM:$654,266 ETD:S654,266 EFC:$3,300,000
DRILLING 13-3/8"@ 3000' MW: 9.0 VIS: 33
CIRC LOSING 13 BPH. DRILLED TO 3248'. PERFORMED LOT TO
11.8 PPG EMW. DRILLED TO 4688'.
DAILY:S42,531 CUM:$696,797 ETD:S696,797 EFC:$3,300,000
Date T;tle
For form pre0aration and distrib __t.~
see Procei]ures Manual, Section 10,
Drilling, Pages 86 anO 87.
AR3B-459-1-D
Number all daily wall history forma consecutively
aa tt~ey are prepared for each wall.
iPage no.
ARCO Oil and Gas Company {~,
Daily Well History--Interim
· nstructions: Th~s form s .~sed during .~rdling Dr workover opera OhS If ~esdng cor:ng or Der~o,ahng show 'ormahcn name ,n ~e~c,,e~ng ~ork 3e,~ormed
Numoer a dr s~em :ests sequen a v A ach desc D on Of aH cores Work performed by Producing Section wd[ be 'eported on "Interim' s~ee's .,nh', ':r*a[
como e on Report o f c a or resrese& a ye es on "Final" Form !) Submit "Interim" shee~s when fll}ed out Dui not less frequently ~han every 30 ~ays 3¢ ,2)
on Wednesday of the week m ~ich od s(rmg is set Submit weekly 'or wor~overs an~ fo~lo~,ng se[t,~g of Oll string unhl lomp~ehon
County or Parish ] Sf.][~?
Oisfnct NORTH SLOPE I AK
ARCO ALASKA INC,
Lease or Unit ,~e~1 ~'o
FieldPBU DS5-21
Pate and depm
as of 8:00 a.m.
08/31/89 (
TD: 6194'(
SV-'TBJ
09/01/89 (
TD: 7100'(
SUPV:RWO
09/02/89 (
TD: 7198'(
SUPV:RWO
09/03/89 (
TD: 7541'(
SUPV:RWO
09/04/89 (
TD: 7952' (!
SUPV:RWO
09/05/89 (
TD: 8154'(
SUPV:RWO
09/06/89
TD: 8288'
SUPV:RWO
09/07/89
TD: 7250'
SUPV:TBJ
Complete record for each day while drilling or workover m progress
NABORS 28E
9)
1506)
10)
906)
11)
98)
12)
343)
13)
411)
14)
202)
15)
134)
16)
0)
POOH F/NEW BIT 13-3/8"@ 3000' MW: 9.2 VIS: 32
DRLD & SURV TO 6194'. POOH F/NEW BIT NO. 5.
DAILY:S41,449 CUM:$738,246 ETD:S738,246 EFC:$3,300,000
CBU AT 7100' 13-3/8"@ 3000' MW: 9.4 VIS: 33
MU BIT & BHA AND RIH. REAM TO BTM. DRLD TO 6600', PERFORMED
OPEN HOLE LOT TO 10.4 PPG EMW. DRLD TO 7100', CBU, SHORT
TRIP. CBU.
DAILY:S52,797 CUM:$791,043 ETD:S791,043 EFC:$3,300,000
DRILLING AT 7198 13-3/8"@ 3000' MW: 9.8 VIS: 35
DROPPED SS. POH. RAN GR-DIFL-Z-DEN-CAL-TEMP. 2ND RUN
~H~-TEMP~R-RFT F/ 7100- 3000'. R/D WL. M/U BHA. RIH TO
7100'. CIRC AND WT UP TO 9.8 PPG. DRILLED F/ 7100-7198'.
DAILY:S121,324 CUM:$912,367 ETD:S912,367 EFC:$3,300,000
TIH W/LWD TOOL 13-3/8"@ 3000' MW: 9.8 VIS: 36
DRLD TO 7541'. DROP SURVEY, POOH. ?U MWD TOOL, TIH.
LOGGED W/MWD F/7089' - 7460'.
DAILY:S50,816 CUM:$963,183 ETD:S963,183 EFC:$3,300,000
DRILLING AT 7952 13-3/8"@ 3000' MW: 9.8 VIS: 39
LOGGED W/ MWD TO 7541'. DRILLED TO 7796'. TRIP FOR BHA.
REAMED F/ 6011-6097' & 7711'-7796' DRILLED F/ 7796-7952'.
DAILY:S45,955 CUM:$1,009,138 ETD:S1,009,138 EFC:$3,300,000
POH TO CHG MUD MOTOR 13-3/8"@ 3000' MW:10.1 VIS: 38
DRILLED TO 8113'. POH TO 7627'. HOLE TIGHT. C & C MUD. REAM
TO BTM. C & C MUD. RAISE MW TO 10.1 PPG. TRIP FOR BHA.
DRILLED TO 8154'. TRIP TO REPLACE MUD MOTOR.
DAILY:S43,523 CUM:$1,052,661 ETD:S1,052,661 EFC:$3,300,000
P/U DP TO SET CMT PLUG 13-3/8"@ 3000' MW:10.1 VIS: 36
POH. CHG'D OUT MUD MOTOR. WIH. MWD NOT WORKING. TRIP FOR
MWD. DRILLED F/ 8154- 8288'. ANGLE NOT BUILDING. TOH TO SET
CMT PLUG. TIH W/ DP TO SET CMT PLUG.
DAILY:S47,191 CUM:$1,099,852 ETD:S1,099,852 EFC:$3,300,000
RIH W/ KO ASSY 13-3/8"@ 3000' MW:10.1 VIS: 45
WIH W/ OE DP. SET 775 SX BALANCED PLUG F/ 8288-7252'. POH TO
7100'. CIRC DP CLEAN. POH TO 5468'. CIRC DP CLEAN. POH L/D
2-7/8" DP. P/U BHA. WIH TO 2697' SLIP & CUT DL. WOC 4 HRS. WIH TO
4450' CIRC. GIH W/ BHA.
DAILY:S83,014 CUM:$1,182,866 ETD:S1,182,866 EFC:$3,300,000
The aOove,r~O~rec[/ ~,
/
For form preparation and d,str~Ou[,on
see Procedures Manual Sect*on I0
Drilling, Pages 86 and 87
Drilling Supt.
AR3B-459-2~8
Number all daHv well h,story forms consecutively
as they are prepared for each well
Page
ARCO Oil and Gas Company
Daily Well History--Interim
· nstructions: Th,s 'o;m :s used dur,ng drl lng or workover oDerat OhS i~ es lng. :Or,rig. or...~erforatmg~ show ~or~at,oo
N~m~er ~ ~r s em es s se~uen a y A tach descrm ,on of aH corgs Wor~ ~erformed by ~roduc,ng ~ect~on ~1~
coma~et~on ReDort o f~c~a~ or represen ave est on l'FiRaJ" ~rm ~ Submit "Interim" s~eets when tH~ed ou~ Ou~ not less frequently ~han eve,y 30 days
on We~nescay of :he wee~ m ~mch od string is set Submit weekly for workovers and ~oHowmg sett,ng ol o,~ string
District ICounty or Par,sn
ARCO ALASKA INC. NORTH SLOPE ;:'~ AK
Field ILease or Unit
?BU DS5-2i
asDateof and8 00 depths.re. Corn p~ete record for eachNasORSday whHe28Edr, lhng or workover ,n progress
17) CIRC AND COND MUD 13-3/8"@ 3000' MW:10.1 VIS: 37
193) WIH TO 7200'. CIRC. TAG CMT AT 7321'. DRESS OFF CMT TO
7443'. CIRC. DROP SS. PULL WB. TESTED BOPE. WIH W/ ST ASSY
CBU AT 740
09/08/89 (
TD: 7443'(
SU?V:TBJ
09/09/89 (
TD: 7995'(
SUPV:LP
09/10/89 (
TD: 8398'(
SUPV:LP
09/11/89 (
TD: 8398'(
SUPV:LP
09/12/89
TD: 7443'
SUPV:LP
09/13/89
TD: 7380'
SUPV:LP
09/14/89
TD: 7744'
SUPV:RWO
09/15/89
TD: 8075'
SUPV:RWO
18)
552)
DAILY:S50,991 CUM:$1,233,857 ETD:S1,233,857 EFC:$3,300,000
19)
4O3)
RIH W/ BHA #12 13-3/8"@ 3000' MW:10.1 VIS: 43
DRILLED F/ 7443-7541'. CIRC MUD. DRILLED F/ 7541-7794'. DROP
SS. POH TO CHANGE BHA. WIH. DRILLED TO 7955'. CBU. TRIP FOR
BHA.
DAILY:S62,139 CUM:$1,295,996 ETD:S1,295,996 EFC:$3,300,000
20)
POH W/ BHA fl3 13-3/8"@ 3000' MW:10.1 VIS: 37
WIH W/ BHA. REAMED F/ 7743-7955'. DRILLED TO 8103'. POH TO
8076' HOLE TIGHT. CBU. POH HOLE TIGHT F/ 8103 TO 8071' .
CHANGED BKA. WIH. DRILLED TO 8398'. ANGLE NOT BUILDING. CBU.
POH.
DAILY:S53,548 CUM:$1,349,544 ETD:S1,349,544 EFC:$3,300,000
21)
RIH TO DRESS CMT PLUG 13-3/8"@ 3000' MW:10.1 VIS: 36
POH. L/D MWD. WIH W/ OE 5" DP. CBU. SPOTTED 1100 SX CL G AT
15.8 PPG F/ 8398- 7200'. POH 14 STDS. CBU. POH. M/U BHA. WOC
6 HRS. RIH W/ BHA TO DRESS OFF CMT.
DAILY:S98,939 CUM:$1,448,483 ETD:S1,448,483 EFC:$3,300,000
22)
RIH TO DRESS CMT PLUG 13-3/8"@ 3000' MW:10.1 VlS: 39
RIH W/ BHA. WASHED F/ 7180-7411'. DRILLED CMT TO 7443'. CIRC
HOLE CLEAN. POH. WIH W/ 5" OE DP. CIRC. SET 700SX CL G CMT
PLUG AT 16.2 PPG F/ 7443-6800'. DROP DP WIPER PLUG. POH. WOC
6.5 HRS. RIH W/ 12-1/4" BHA.
DAILY:S43,630 CUM:$1,492,113 ETD:S1,492,113 EFC:$3,300,000
23)
364)
DRILLING AT 7380 13-3/8"@ 3000' MW:10.1 VIS: 38
RIH TO 6793' (TOC). DRILLED CMT TO 6950'. CBU. TRIP FOR BHA.
RIH TO 2500'. TESTED MWD. WIH TO 6950'. DRILLED F/
6950-7380'.
DAILY:S47,956 CUM:$1,540,069 ETD:S1,540,069 EFC:$3,300,000
24)
331)
DRILLING AT 7744' 13-3/8"@ 3000' MW:10.1 VIS: 38
DRILLED F/ 7380-7483'. TRIP FOR BIT. CUT AND SLIP DL. WIH TO
7100'. LOGGED W/ MWD F/ 7100-7483'. DRILLED TO 7744'.
DAILY:S43,205 CUM:$1,583,274 ETD:S1,583,274 EFC:$3,300,000
The abov~,e~c~ o r rect
For form oreParat~on and distr~bu~,on
see Procedures Manual Section
Drilling, Pages 86 and 87
TIH W/MUD MOTOR ASSY 13-3/8"@ 3000' MW:10.1 VIS: 41
DRILLED F/7744-7797'. TRIP FOR BKA. DRILLED F/7797-7885' .
CIRC, SHALE BLINDING SHAKERS. DRILLED F/ 7885-8075'. DROP
SS. POH TO CHG BHA. TESTED BOPE. TIH W/ MOTOR ASSY.
DAILY:S56,934 CUM:$1,640,208 ETD:S1,640,208 EFC:$3,300,000
' AR3B-459-2-B
Number aH dSlt¥ well hl$1ory Forms cons*~cuhvely
as ll~ey are prepared for each well
ARCO Oil and Gas Company
Daily Well History--Interim
· Instructions: This form ~s used durmg drHiing or workover oper'at*ons :f testing, cor,ng or perforahng. Sh:,w formahor~ name ,n tescrtbing work performed
Numeer aH drill stem ~ests sequentially. Attacr, descriptldn of all Cores ,Nork o~rformed by Producmg Sec'.~on ,~1 be repoced on "Interim" sheets until hnal
completion Report official or representat*ve test on "Final" form I~ Submit "Interim" sheets when filJed out but not =ess f,equenHy than every 30 days. or f2}
on Wednesday of (he week ,n which oii strmg ;s set Submit wee.My ~or workover$ and following seHmg of o~ strmq tJntll complehon
Oistrict ICounty or Parish
ARCO ALASKA INC. I NORTH SLOPE
Field Lease or Umt
PBU DS5-21
asDateof ands:00 deptha.m. Complete record for eaCaNABoBSday while28Edrill~ng or workover in progress
09/16/89 (25) TIH
TD: 8529' (I 454)
[
SUPV: RWO
09/17/89
TD: 8690'
SUPV: RWO
Stale
AK
IweH no
09/18/89
TD: 8690'
SUPV:RWO
09/19/89
TD: 8700'
SUPV:RWO
09/20/89
TD: 9112'
SUPV:RWO
09/21/89
TD: 9445'
SUPV:RWO
09/22/89
TD:10010'
SUPV:RWO
(26)
( 161)
(27)
( 0)
28)
10)
29)
412)
30)
333)
31)
565)
The a b o ve~j,~'~,~we c t /,/
Signat
13-3/8"@ 3000' MW:10.1 ViS: 38
RIN. TAGGED UP AT 7754'. REAMED F/ 7754-8075'. DRILLED F/
8075-829'. DROP SS. POH TO CNG BHA. TIH.
DAILY:S52,211 CUM:$1,692,419 ETD:S1,692,419 EFC:$3,300,000
RUNNING 9-5/8" CSG 13-3/8"@ 3000' MW:10.1 VIS: 37
TIN, TIGNT AT 8229'. REAM F/ 8449-8529'. DRILLED F/
8529-8690'. CBU. SHORT TRIP. CPU. DROP SS. POH. L/D BNA. R/U
AND RUNNING 9-5/8" 479 L-80 BTC CSG. 140 JTS IN HOLE AT 0600
HRS.
DAILY:S43,057 CUM:$1,735,476 ETD:S1,735,476 EFC:$3,300,000
TESTING BOPE 9-5/8"@ 8674' MW:10.1 VIS: 40
RAN 105 JTS 9-5/8" 47~ L-80 BTC AND BTC MOD CSG TO 8674'.
CIRC HOLE CLEAN. R/U CMT'G CO. PUMPED 50 BBLS FW SPACER
FOLLOWED BY 375 SX CL G AT 15.8 PPG. BUMPED PLUG W/ 3000
PSI. CIP AT 1320 HRS 9/17/89. BACKED OUT LANDING JT. WEAR
BUSHING WOULD NOT LAND. N/D BOP STACK. REPLACED CSG HANGER
SEAL. N/U BOP. INSTALLED WB. INSTALLED TEST PLUG. TESTING
POPE.
DAILY:S300,182 CUM:$2,035,658 ETD:S1,735,476 EFC:$3,600,182
CLEANING MUD PITS 9-5/8"@ 8674' MW: 9.8 VIS: 38
P/U 8.5" BHA AND TIN TO 8591'. CUT PL. TESTED CSG TO 3000
PSI FOR 30 MIN. DRLD CMT AND FORM TO 8700'. CPU. RAN
FIT-12.5 PPG EiVS4. INJECTED WB MUD AND CLEANING MUD PITS FOR
OBM.
DAILY:S40,900 CUM:$2,076,558 ETD:S2,076,558 EFC:$3,300,000
PON & CHG BHA 9-5/8"@ 8674' MW: 8.9 ViS: 46
CLEAN PITS. REC'D 1130 BBLS 8.9 PPG OBM. DISPLACED 10.1 PPG
WBM W/ 8.9 PPG OBM CHANGED SS SCREENS. DRILLED F/
8700-9112'. TRIPPED FOR BHA CHANGE TO CORRECT DIRECTION.
DAILY:St57,575 CUM:$2,234,133 ETD:S2,234,133 EFC:$3,300,000
DRIILING 9-5/8"8 8674' MW: 8.9 VIS: 46
TIN W/ MUD MOTOR ASSY TO 9112'. DRILLED F/ 9112-9262'. MOTOR
FAILED. TOH. L/D MOTOR ASSY. WIH W/ ROTARY ASSY. DRILLED TO
PP.
DAILY:S51,310 CUM:$2,285,443 ETD:S2,285,443 EFC:$3,300,000
DRILLING AT 10010 9-5/8"8 8674' MW: 8.8 VIS: 44
DRILLED F/ 9445-9896'. PH. CHANGE BHA. TIH. CUT & SLIP DL.
DRILLED F/ 9896-10010'
DAILY:S51,995 CUM:$2,337,438 ETD:S2,337,438 EFC:$3,300,000
%/,,/~ , .... Drilling Supt.
For form preparation and distribution
see Procedures Manual Section tO.
Drilling, Pages 86 and 87
AR3B-459-2-8
INumber all dally well hlSlOry forms coesecullvely ~Page no
as they are prepared for each ~vell
ARCO Oil and Gas Company {~,
Daily Well History--Interim
Instructions: This form's used aurlng drHiing or workover operations If testing, coring, or cerforatmg, show ~ormat~on name ~n describing ,York oerformed
Nurnoer all drill stem tests sequentially Attacn description of al! cores Work performed by Producing Section wdi be reoor,ed on "lnlerim" sheets unh[ hnal
completion Reoort official or representative test on "Final." form. 1) Submit "Interim" sheets when tilled ou~ bul not less frequently than eve,y 30 ,"Jays. or (2)
on Wednesday of the week in which od string *s set. Submit weekly for workovers and following setting of oll strln~ unlll completion
0istrict JCounty or Parish ]SIale
~.gC'A:"-T.A~''a TNC' I N~H ~T,~PE AK
~n I DS5-21
Date and depth - --- Complete record for each day while drilling or workover in progress
as of 8.~ a.m.
09/23/89 (
TD:10210' (
SUPV:RWO
09/24/89 (
TD:10913'(
SUPV:RWO
09/25/89 (
TD:10913' (
SUPV:RWO
09/26/89 (
TD:ll300'(
SUPV:TJ
09/27/89 (
TO:il300' (
SUPV:TDJ
09/28/89 (
TD:ll300
PB:l1300
SUPV:RWO
09/29/89 (
TD:ll300
PB:11300
SUPV:RWO
3:)
.~00)
3))
703)
)
o)
)
87)
)
o)
For form preparation and distribulion
see Procedures Manual Section 10.
Drilling, Pages 86 and 87
DRILLING AT 10210 9-5/8"@ 8674' MW: 8.8 VIS: 48
DRILLED F/ 10010-10205'. POH TO CHG BHA. TESTED BOPE. TIH.
REAMED F/9950-10205 DRILLED TO 10210'.
DAILY:S52,792 CUM:$2,390,230 ETD:S2,390,230 EFC:$3,300,000
RELOGGING GOC 9-5/8"@ 8674' MW: 8.8 VIS: 45
DRILLED F/ 10210-10305'. CBU. DRILLED F/ 10305~10913'. TOH.
DAILY:S78,209 CUM:$2,468,439 ETD:S2,468,439 EFC:$3,300,000
RELOGGING W/ ANADRILL 9-5/8"@ 8674' MW: 8.8 VIS: 44
RELOG F/ 9264-9893'. POH. RECOVERED RLL LOGS. WIH TO 10046'
(HOLE TIGHT). REAM F/10046-10110' & 10300-10330'. FIH TO
10659'. RELOG F/ 10659-10913'.
DAILY:S51,283 CUM:$2,519,722 ETD:S2,519,722 EFC:$3,300,000
POH AND L/D BHA 9-5/8"@ 8674' MW: 8.8 VIS: 46
RELOG W/ ANADRILL F/10659-10913'. DRILLED F/ 10913-11300'.
C & C MUD. SHORT TRIP. REAM F/ 11220-11300'. CIRC. POH.
REMOVE LOG INFO F/ RLL TOOL. L/D BHA.
DAILY:S50,652 CUM:$2,570,374 ETD:S2,570,374 EFC:$3,300,000
DRLG FORM/L?LOG AT 10038 9-5/8"@ 8674' MW: 8.9 VIS: 57
CHANGED TOP RAMS TO 3.5X7" VARIABLE. P/U 3.5" BHA. WIH TO
11300'. SPOTTED 13 13 PPG MUD F/11300-10200'. SPOTTED
FO~LUG F/ 10200-9950'. POH. WIH W/ 8.5 DRILLING BHA.
TAGGED FORMA PLUG AT 9725' WASHED F/ 9725-9851'. DRLD
F/9851- 10038'. PLUG FIRM AT 10038'. DRILLING FORMAPLUG.
DAILY:S254,361 CUM:$2,824,735 ETD:S2,824,735 EFC:$3,300,000
CIRC AND COND MUD 9-5/8"@ 8674' MW: 8.90BM
DRILLED FO~ PLUG F/10038-10200'. CIRC HOLE CLEAN. POH TO
RUN 7" LINER. L/D BHA. RAN 46 JTS 7" 29# LB0 BTC LINER. WIH
TO 10200'. CIRC TO CLEAN HOLE.
DAILY:S42,007 CUM:$2,866,742 ETD:S2,866,742 EFC:$3,300,000
DRILLING CMT @ 8046 7"@10200' MW: 8.90BM
CMT'D 7" LINER W/ 500 SX CL G CMT @ 15.8 PPG. BUttED PLUG W/
2000 PSI. RELEASED F/ BAKER LINER HANGER. INFLATED ECP.
PRESSURE LE,a~(ED. POH AND L/D LINER RUNNING TOOL. RIH W/ BIT.
TAGGED CMT AT 7940'. CBU AT 7940'. P/U STORM PACKER AND SET
AT 100 FT. N/D BOP. CHG'D OUT DRILLING SPOOL TO TUBING
SPOOL. N/U AND TEST BOP TO 5000 PSI. RETRIEVE STORM PACKER.
CLEAN WIND WALLS. DRILLED CEMENT F/ 7940-8046'.
DAILY:S148,710 CUM:$3,015,452 ETD:S3,015,452 EFC:$3,300,000
· AR38-459-2-B
INumber all daily well history forms Consecuhvely
as they are prepared for each well.
IPage nO
ARCO Oil and Gas Company
Daily Well History--Interim
Instructione: This form s Jsed during drilling or workover operations ;f ~esting coring, or perforating, show lormation name in describing work performed
Number a~! drill stem tests secuentlaliy. Attach description Of all cores Work Performed by ProC~ucmg Section ~vHI oe reported on "Interim" sheets ;Jntll fmat
comDletlon. Report off~cla~ or representative test on "Final" Iorm ~ Submit "Interim" sheets when hlled out but not ,ess ~requenHy than every 30 days, or (2)
on Wednesday of the week m which oH string ~s set. Submit weexiy for workovers and following setting of o~1 stpmG unhl compleDon
District
Field
County or Parish lS,a,e
ARCO ALASKA INC. NORTH SLOPE AK
Leas~ or Unit
PBU DS5-21
WeH no
Date and depth
as of 8:00 a.m.
09/30/89 ( 3
TD:11300
PB:ll300
SUPV:RWO
10/01/89 ( 4
TD:ll300
PB:ll300
SUPV:RWO
10/02/89 ( 4
TD:ll300
PB:ll300
SUPV:RWO
10/03/89 ( 4
TD:11300
PB:ll300
SUPV:RWO
10/04/89 ( 4
TD:ll300
PB:11300
SUPV:RWO
Complete record for each day while drilling or workover in progress
NABORS 28E
POH FOR CBT LOG 7"@10200' MW: 8.90BM
DRILLED SOFT CMT F/ 8046-8353'. CBU. POH L/D 8.5" BHA. P/U
6" BHA AND WIH TO 8353'. CUT AND SLIP DL. DRILLED SOFT CMT
STRINGERS F/ 8353' 10117' (LANDING COLLAR). CBU. TESTED CSG
TO 3000 PSI FOR 30 MIN. DRILLED LC AND FIRM CMT TO 10157' .
TESTED LNR TO 3000 PSI FOR 10 MIN. DRLD FC AND HARD CMT TO
10177'. TESTED LNR TO 3000 PSI TO 3000 PSI FOR 10 MIN. POH
TO RUN CBT LOG.
DAILY:S70,004 CUM:$3,085,456 ETD:S3,085,456 EFC:$3,300,000
DRLG CMT AT 10200 7"@10200' MW: 8.90BM
POH. L/D BHA. P/U GR/CBT/CET DP LOGGING TOOLS. WIH TO 10070'
W/ DP. WIH W/ WIRELINE LATCHED ON TO LOGGING TOOLS. RAN
GR/CET/CBT F/ 10070-8290'. POH W/ WL POH W/ DP. P/U 6" BHA
AND WIH TO 10177'. DRLD CMT F/ 10177-10200'.
DAILY:S69,471 CUM:$3,154,927 ETD:S3,154,927 EFC:$3,300,000
RIH W/SLOTTED LINER D LINER 7"810200' MW: 8.90BM
DRILLED CMT TO 10200' AND FOR/~LUG TO 10400'. REAM F/
10400-11300'. CBU. ST. CBU. POH. L/D BHA. P/U 39 JTS (26
SLOTTED) 4.5" SLOTTED LINER. M/U TIW 7"X4.5" HYD SET MODEL
SS PACKER @ 9720'. RIH W/ SLOTTED LINER ASSY.
DAILY:S36,825 CUM:$3,191,752 ETD:S3,191,752 EFC:$3,300,000
POH L/D DP 7"@10200' MW: 8.9 OBM
RIH TO 10270'. BROKE CIRC. PUMPED DN DART. SET TIW PK RIH TO
11270 W/ 4.5" FL4S LINER. BROKE CIRC. SET 4.5"X7" PACKER AT
9720' W/ 2400 PSI. TESTED BACKSIDE TO 3000 PSI. POH. L/D
SETTING TOOL AND WASH PIPE. P/U SEAL ASSY ON DP. WASHED OVER
SLICK STICK AT 9710'. TESTED SEALS TO 3000 PSI. POH AND L/D
DP~
DAILY:S73,704 CUM:$3,265,456 ETD:S3,265,456 EFC:$3,300,000
RIH W/ COMPL ASSY 7"@10200' MW: 8.9 NaC1
POH & L/D DP. R/U AND RUNNING 3.5" 9.3tL80 RUE 8RD MOD X
4.5" 12.6~ L80 BTC MOD COMPLETION ASSY. AVA 'ACGA' SSSV @
9719'.
DAILY:S48,491 CUM:$3,313,947 ETD:S3,313,947 EFC:$3,300,000
For form preparation and dJstr~"butlon
see Procedures Manual Section 10.
Drilling, Pages 86 and 87
lC)ate . ITitle
x¢~.~¢,~ /~//,/~ Odlling Supt,
AR3B-459-2-B
INumber all dady well h~story ~orms consecullvely
as they are prepared for each well
IPage ~o
ARCO Oil and Gas Company
Daily Well History-Final Report
Instructions: g'ees,e amc suom~[ the "Final Report" an
"Final Report" s~ouJd be suDmt~ed Also when ogera~Jons ere suscen~ed 'o~ an m~eftnr~e or accrec~ame 'epgTh~* ~:me On w,g~overs when ,]n CH~c:aJ ~est s ~ot
require,3 eden comolePon repeal comoJetJon and representative :es; %a:3 ,n blocks provided T~e "Final Report" ¢o,m may ge used for -egort,ng '~e en'~re
o~er~[gn ~ space JS ava;:~D~e
Accobntmg :asr center ,.'ode
District ] /C .... y or P .... h
ARCO ALASKA INC. NORTH SLOPE AK
~eld Lease or Un,t ';,e
PBU ADL: 28329 DS5-2i
Auth, or Wa no T~t!e
AS3102 DRILL & COMPLETE
Operator
ARCO
Spudded or W O begun
SPUD
50-029-21969
i~rotal number o! wells lac:we or mactwe) on ~'s
cost center pr~or to pluggmg and
abandonment of th,s well J
Hour0930 HRS Prior status ff a vv.o.
ARCo WI
22.0000
08/23/89
Date and depth Compiete record for each day reported
as of 8:00 a.m
NABORS 28E
4)
10/05/89 (
TD:ll300
PB:11300
SUPV:TDJ
FINAL REPORT 7"@10200' MW: 8.9 NaCl
SPACE OUT, M/U TBG HGR, LAND TBG, TEST CONTROL LINES TO 5000
PSI. TEST ANNULUS TO 3000 PSI. L/D LND'G JT. SET BPV. N/D
BOPE. N/U TREE AND 5000 PSI. RESET BPV. R/D FLOOR. PREP TO
MOVE. RELEASE RIG AT 2200 HRS 10/4/89.
DAILY:S209,588 CUM:$3,523,535 ETD:S3,523,535 EFC:$3,300,000
Old TD New TD JoB Deeth
Pe~eased ng Pate I Kind of dg
Classifications (oil, gas, etc.;
Type completion (smg~e. dual, etd;
Producmg method Offic:al reservo,r ,-,amefs)
Potential test data
Well no. Date Reservoir Producing Interval Od or gas Tesl time Product,on
Oil"on te~t" Gas per day
Pump size, SPM X length Choke size TP. C.P. Water % GOR Gravity Allowable Effective daIe
corrected
,,--7
z~ _ ~/, ~w ¢o¢ /¢//~, Orilli~ Supt.
For form preparation and distribution,
see Procedures Manual, Section 10,
Drilling, Pages 86 and 87.
Number 81l daily well history forms consecutively I Page no
· as they are prepared for each well,
AR3B-459-3-C m,~,~o, of AtlentlcRIchfletdCompen'
ORIGINAL
MICROFILMED
W£LL NAME !)RILLSiT£ 5 W~L 21 S!D~RCK
L~ATI~ 2 ALASKA
MAGNET:C OECLb,:::~:ON 30~6
DATE ~
W:LL
WELL HEAD LOCATION: LA?(N/-S) 0.00 DEP(E/-W) 0,00
FROM ROTARY TABLE TO TAE~gT IS '~n ^~
TiE tN POINT(TIP)
MEASURED DEPTH 4?4.00
TRUE VERT DEPTH
INCLINATI~ 0.00
AZI~JJ~H:: f, 180,00
LATII1J])£(N/-S) 0.00
DEC'2 71989
0il & Gas Goos.
'Ao~horage
. F'~I~ NJ], 2 ,-~-~ DRILLSiTE 5 WE, LL
MEASUPd~I)
ft
494.00
14S3,0C
2485,0C
************* ANA~ILL ***.***********
SURV~ CALCb%A?iONS
RADIUS O? CURVATURE
!Nll~x~u VI~k~I~L ?A~G~ STATION AZIMUTH LATITUDE
~H SBC~!ON INCLN.
ft ft ft deg ~m~ ft
0.0 494,00 0,00 0,00 i~O,O0
496,0 %~----~0,000,00 O,O0 !~O.'i)()
493,0 !483,00 0,00 0,00 180.00
.,~H.,O t~,'~ 1,94 o,5o l?&oO
498,0 2484,?7 5,89 0,50 !72,00
DEPARTURE DISPLACEMENT ar AZIMUTH
3747.00
4192,00
46?0,00
..5,o~9 2979,93 !0,49 1,00 216,,:),0
369,0 3346.88 7.36 0,90 312,00
. , ~1
??8,0 374~,83 ~,78 !,00 ~,~.,0~
445,0 419!,79 1,86 0,50 310,00 -12,04
4?8.0 468%77 4,72 0,50 !50.00 -14.01
5188,0C
5717,00
6i76~0C
6646,00
6927.00
4?8,0 5!87.76 6,81 0.00 !80.00 -i6,09
529,0 b-;16,75 %0! 0.50 120.00 -18,00
459,0 6!~,65 12,82 !,80 $8.~0 -17,38
470.0 6645.52 16.19 0.~0 89.00 -!5.18
281,0 6926.48 !7.61 1,00 68.00 -!4.26
-14,73 21,81 222,47
-i3,63 22,58 217,13
-4.75 18.02 295.28 0.34
6,04 16.34 158,31 0,22
10,56 t7,~ i43,47
7121,00
7492,00
7686.00
789%00
' 194,0 7120,34 22.25 3,10 146,00 -16,14
187.0 7305,33 47.93 12,80 i43,00 -37.I7
184.0 7461,82 98.96 19,80 141o00 -77,M
194,0 7661,19 171,30 24.~ 138,00 -133.91
213.0 7850.23 267.84 2?,90 143,80 -209,92
16,70 23,22 134.02 1.57
31.70 48.65 139,54 5.19
6~
~,47 100.43 140,80 3.82
111.36 174,16 140.25 2.69
173,14 272.1t t40.49 2.66
8085.00 186.0 8005.88 368.98 36,40 146.00 -293.08 231.59 373.54 141.09
~274.00 18%0 8158.19 480,57 36,20 147,00 -386.39 293,34 485.12 142.79
8458,0C 184,0 ~306,86 588,76 36,00 147,0Q -477,31 352.39 593,30 t43.56
8608,00 150.0 8425,20 680,70 39,80 147,00 -554,~ 402,56 685.28 144,02
~834.00 226.0 8586,78 837.89 46.80 145.30 %85,52 490,39 842.87 144.42
0.33
O,ii
7',53
4,02.
892%00
9021.00
9119,00
9307,00
95,0 8446,88 911,05 52,70 144.10 -745,55
92,0 870,0,58 985,17 55,86 143,D -805,7i
98,0 8752,97 1067,33 59,50 i43,70 -872,24
89,0 8797,27 I144,36 60,80 t52.~ -937,54
79,0 8843,67 1~1,73 ' 63,30 154,00 -I015.45
532,89 9i6.42 144.44
577.14 991.09
626,44 1073,89 144.31
~7,48 1!50,87
707,1~ 1237.43 i45.15
4.22
:3,52
3,74
a,22
9495.00
9591
9776.00
96.0 ~:~92~ ~318,~;;;~ 65.80 154.00 -i093.36
~'.0 ~.~.64 t402.92: 68,50 153.20 -t169.27
96,0 '4i)9'J3~7~ 1492,'9!, :-71.10 153.40 -1249,77
~.0 ,l)~I:*~ l~l,v.$k.-~. 74.00 152,00 -1328,59
~,0 ~,.01' 1~0,52- 76,60 i5t,~ -1406.87
745.t7 1323.14 145.72
782.87 1407,16 146.20
823.34 1496.60 146.62
,
864,03 1584,84 146,96
?06,35 1673.54 147.21
2,60
.3,04
~,43
2,95
9873.00
~62,00
10062,00
10164,00
10259,00
97,0 ?025,18 1765,38 7%40 148,40 -1488.85
89.0 ~38,48 1853.26 83,40 147.60 -!563,46
i00,0 9046,24 i952,73 87,70 146,40 -1647.06
102,0 .~44,47 20D¢.46 91,80 !46,'~ -!732.24
95,0 9042,50 2149,19 93,00 147,20 -!M1,89
954,07 1768,31 147.35
1000,69 1856.29 147,38
1054,98 1~5,96 147,34.
.0~7,93 ~47,32
!111,04 ~ ~ '
1162,66 2152,84 147.3I
4,04
4,58
4,46
4,05
1,30
RECEIVED
DEC 2 z 1989
~,iaska Oil & &~s Cons. Commissiq~
Anchorage
· PA~E ~Q. it "-" DRiLLS!T~ 5 WELL 21
M~lT.J~i) INTEL UERT!CAL
DFJ:"TH DI~I'H
fr fi: fi:
t03S2,00 93,0
10445,0C 93,0 9034,87
I05~.),00 95.0 903!,~
~.36.v.,, 96,0 9029.21
I0730,00 94,0 90~.32
I!014,00
i1112,00
i1218,00
11300,00
11300,00
SURV£Y ~ULATiONS
TARG~ STATION AZiML~H
S~TION INCLN,
ft deg dR
2241.95 92.20 147.70
2z'f~4.77 92,00 147.70
2429.59 9t.70 147.70
925,41 91.40 i47,20
26!9,23 ~0,90 !47,%,
96,0 ~025,96 27!5.06 90,70 i47,20
~7,0 9026,47 28!!,94 89,70 146,40
91,0 9027.56 2902,85 88,90 i48,10
98,0 ~03!.()0 3000,69 87.10 i48,!0
106,0 9037,84 3106.36 85,~ 148,10
82,0
IS A PROJ£CTEI) S~V~
LATITUDE DEPART~:E DISF'LACE~ENT at ~Zi~UTH
N./-S
· ft ft ft
-1690,20 1212,65 224~,74 147,32
-1968,76 1262,31 2338,69 !47.33
-2049,02 1313,05 2433,63 !47.35
-2129,91 i~4,66 929,60 147,~
-2~:~.04 14!5,38 2623,57 !47,35
-2289,66 !467.17 27!9,57 147,35
-2371,94 1518,85 2816,56 147,37
-2449,3! 15~.73 2907,54 147,39
-2532,46 16!8~49 3005.47 147.42
-2622,26 16f4.38 311i.24
3168.03 85,50 146,10 -2691,66
AT 8,5 HO~TD
!OOft
i.01
0,2I
0,62
"
I
1717.58 3192,~6 147,46
RECEIVED
~Liaska Oil &
~:,~,:s Co.~s. Commissio:"
Anchorage
RECEIVED
/~Jaska Oil & C;~s Cona. Commissio:
Anchorage
PAG£ NO, '~ ' ~ ,~-~ DRILL$ITE 5 ~ELL ~
.,
SURVEY ANALYSIS
~ i~.C~
ft d~
GJ~INC_CH~ I_R~I~ ~Z~_CH~ deg deg/tooft ~eg
TURN
d~j/'lOOfs
CLO51JRE TOOL_?~E DL$ DLEiRT
ft deg deg/looft decj/tOOft**2
494.0
990,0
1483.0
i987.0
2485.0
4?4,00 O,(YJ
9~.® 0,00
1483.00 O.O0
198~.99 0,50
2484,97 0,~
0,00 0,00 0,~
0,00 0,00 0,00
0,00 O,OO 0,00
0.50 0,10 -2,00 -2,00
0,50 0.00 -6.::)0 -6,00
O,,M) 0,00 0,00 0,00 ).00
0,00 0,00 O,OO 0,00 0,00
0,00 O.O0 0.00 0,00 0.00
-0;40 -1,04 o.oo 0,10 0.02
-i .20 0,00 '3-.00 0,01 O,C:
2980,0
3349~0
3747,0
4192.0
4690,0
~79,93 0,50
33~,~8 -0,!0
~74~,83 0,I0
4191,79 -0,50
4689,77 0,00
1,00 0.10 44°00
0,90 -0,03 96,00 1~2,00
I.'~ 0.03 -91,00 4i,00
0,50 -0.11 89,0~) i30.00
0,50 O,OO -I~.OO
8.89 -7.18 72.34 0.15 0.03
26,02 -1!.59 !.40,69 :.}.38 ).0~
-22.B~ -16.9! 132.54 0.34 ~',91
20.~ -21.27 153.23 0.25 0.02
-32,13 -2.84 91,3! 0.20 0,01
5188.0 5i87.76 -0,50
57!7.0 5716.75 0,50
6176,0 ~!~,65 i,S~
&~46,0 ~45,52 -0,~0
69~,0 6926,48 0,!0
0.00 -0,10 30,00
0,50 0,0~ -60.00 -60,00
1.80 0.28 -52,00 -i12,00
0.~ -0,19 21,0~ -91,00
!.00 0,04 -2!,00 -112,00
6.02 -20.72 177.96 9.!0 0.02
-!1,34 -20.70 0,00 0,09 0,00
-i1,33 -12,66 66.7I 0.34 0.05
4,47 -2.18 161,39 0,22 0.03
-7.47 -20,19 169.54 0.13 0,03
7121.0
7308,0
7492.0
768~.0
78~.0
7120,34 2,10
7305.33 9,70
74~!,82 7,OO
7~1.19 5,10
7850.23 5.~
3.10 !,OB 78.00 -34.OO
12.80 5,19 -3.(X) -37.00
19.80 3.80 -2.OO -39.00
24,90 2.63 -3,00 -42,00
29,90 2,~ 5,80 -3~,20
40,21 6,65 96,65 1.57 0,75
-1,60 9,41 3.95 5,19 1,~
-1,0~ 17.17 5,54 3.82 0.75
-1.55 31.43 14,00 2,69 0.58
2,72 2,22 84,62 2,a6 0.02
,~)~5,0 8OO5,88 6,5O
02_74,0 8158,19 -0,~
B&OB,O 84~.,20 3.~
~34.0 85~.78 9.~
3~.40 3.49 2,20 -34,00
36.20 -0.11 1.00 -~.00
36,00 -0,1i 0,00 -33.00
39,aO 2.53 0.00 -33,00
4B.BO 3.98 -1.70 -34,70
1.18 58.21 11.41 3,55 0,48
0,53 66.30 109,10 0,32 !,71
0.~ 73.21 0.00 0.i1 0,!2
0.00 79.07 0,00 2.53 i,02
-0.75 48.02 30.70 4,02 0.6~
8929.0
9021,0
9t19,0
9208.0
9307.0
9403.0
9495.0
~91,0
9684.0
9776,0
8446.88 3,~
U00.58 3,I6
8752,97 3.64
8797,27 1.30
B&43.&7 2.50
52.70 4.11 -1,20 -~,~
55.86 3,43 -0.87 -36.77
59.50 3.71 0.47
60.80 1,46 8,30
6:3,30 .~;,, 2.53 2.00
8953,78 2~::::':"j:-71,1~::: ::: :: ::,: 2.71
~)5,01 2.~ '76.60:" ' 2,83
0,00 -26.00
-O.BO -26.80
0.20 -26.60
-1.40 -28,OO
-0.60 -28.60
-1,26 ~.07 13,78 4.22 0,21
-0,95 108,15 12,84 3.52 0.76
0,4~ 118.51 6.33 3.74 0,22
9.33 !22,27 81,85 8,22 5.03
2,02 91.44 8,13 3.09 5,18
0.00 !13,62 0,00 2,60 0.51
-0.87 107.26 15.41 3.04 0.48
0.21 105.10 4,05 2.71 0,34
-1,51 I01.~ 24.93 3,43 0,77
-0,87 !IBo69 35,71 2,~ 0.53
9873.0
~62.0
10062,0
10164,0
10259,0
~25.18 2.80 79.40 2.89 -2.80 -31.60
.r'4)38,484,00 83.40 4,49 '0,60 -32,40
?046.24 4.30 87,70 4,30 -1.20 -33.60
.~046,47 4,10 91,80 4,02 0.50 -33,10
9042.50 !.20 73.00 1.26 0.30 <32.00
-2.89 101.85 44.67 4.04 1,12
-0.90 I05.92 1i.25 4.56 0.61
-1,20 112.27 15.59 4.46 0,12
0,49 I19,3~ 6.92 4.05 0,41
0.32 100,45 16,67 1,30 2,89
RECEIVED
DEC 2 71989
Alaska Oil & Gas Cons. Gommb~,u~
Anchorage
PAGE ),FJ, 3 '--", DRIIJ,SIII~ 5 WELL 21
,mw********** ANAI)RILL **~::::::::::*
SURVEY ANALYSIS
MD ?VD INC_CHG CUMI~_CHG
ft ft ~ deg
I_RAT~ A~_CHG J~UMA~M_CHG
deg/1OOft ~eg deg
loRN RAT CLOSURE TOOL FACE BLS DI~SRT
Oeg/~OOft fr de~ deg/lOOft deg/iOOft**2
10352,0 9038,28 -0,~ ?2,20 -0,86 0.50 -32.30
10445,0 9034,87 -0.20 92.00 -0.22 O.',X) -32.30
105.40.0 9031,~ -0.30 7!.70 -0,32 0,00 -32.30
I0~36.0 7029.21 -0.30 91,40 -0.31 -0.50 -~.BO
10730,0 .90Z7,32 -0,50 70,90 -0,53 0,30 -32,50
0,54 !30,53 148.11 !,01 0,31
0,00 135,3i 0.00 0,21 0,~
0,00 i,;0,19 0.00 0,31 0,11
-0.52 145.55 1~i.03 0.61 O,~
0,32 1~,34 13,~0 0,62 0,0!
10826,0 90~.9B -0.~ 90,70 -0,21 -0,30 -32,B0
10923,0 9026.47 -1,00 89,70 -I,03 1,20 -31,60
11014,0 9027,58 -0,60 88.90 -0o88 -0,30 -31,~
11112,0 ~31,00 -i,80 87,10 -!,84 },~ -31,90
11218,0 ~037,84 -i,~ 85.50 -1.51 0,00 -31.90
-0,31 156,48 123,70 0.38 0.25
!,24 !6!,31 129,~I 1,~t !,27
-0.33 165.I2 159.66 0.94 0.74
0,00 169.47 O,JO !,84
0.00 150,76 149o07 1.5i 0,31
i1300.0 9044.27 0.00 85,50 0.00 0,00 -'31,90 0,00 177.82 90,00 0,00 1,64
11300.0 IS A ~OJECT~D SURVEY AT B,5 ~ TD,
A R C: 0'"' i "'~ /
s.-:-,.. ~.~,--. J... A, i N C: ~
F' ("~ I:.:...~A i (-) <.) '3 6 C,
ANCHOF,..'A(~E, AL. ASKA 9':?E.~i <b
t)ATE ' i 2-2i -89
F;,' Ii?. F' Iii] R' Ii?. N C: lei ' A F..' C 0 D I F,' E C T I O N A t... D A 'F A
A i'.! A I)I:;.: I I... I...
I::'t... E: A SEE S :[ (~ N h N D l:;.' E 'F U F;.'. N 'l" H FZ A 'r'¥' A c: lq E D C O F:' Y A S I:;.'.IE C: E :1: F:' 't" (] I::' D A'i" A.,
RECEIVED
$ r.".', L.. L. Y i-.t C) F' F:' Ii-: C: K Iii: R ' ' ~t"'(~::,~
nT,::~--i '.:~':._:-_'? DEO~ 7 ~ ,'.':',F'~::'~::i':~vr..i:~)
~:~asga Oil & Gas Cons. G -
Anclmraoe
I) I *' ..... ;' . .
~, ~ l.. I BI j T I 0 N
C:EN'f'I;,'At_ F:[LES
C: I..I E ¥ R F) N
I) & H
· I,': E: X T E: N S I C] N E: X F' L. [) F;'. A 'i" I (:] N
..'"'E X X O N
H A F;..' A ]" H [) N
HOBII_
F' I"1 :[ L L I F:'
· ,.'"' I::' B W E'I..... L. F' ]: L.. I!i: $ ('. 2 C (:)I::' :1: Iii: 5' )
F.: & D
· "' F.,' F:' :~'
,':;')"A'T'I:Z OF' ALASKA
l" E: X ,'.'.) C: CI
AIr(CO AI...ASKA, INC,
P, O, BOX t (')(')::~.6(:,~
ANI::::HOF;~AGE, ALASKA
995 ~ ~
DATE' t'2-'5-89
KEFERI::NL, E' AKCO CASED HOI_E FINALS
t-26 t t-t ':i-'E),9 PIT,S' ' I:;~I.JN
i-29 t t-t '7'"'89 I'-:'I T;:~ RI. JN
t .... 3;4 i ~""~ 7'-89 PII'£' RUN
D'-Pi t i -t 8-89 GR/CCL RUN
7-t 6 t t -t 6-89 INJEC;TICIN F:'RC:~FILE: F;.'UN
'7-34 ~ t--i 5'"'89 IN.JEC'¥ION F'F;:OFILE RUN
t i "":.~. ~ t'-~ 9-89 PF;.'ODUCTION F'RCIFI'LE RUN
ti-t0 ti .... t8-89 /"EHF' RUN
A;. #'* 'l "! '~ "' '
.t t - '~ 6 J I ~ 9-' 0 9' Z N J E C'T I 0 N F' F, C F Z L F R U N
i a 2 o I::: IJ N
~..'- .,.~ t i -i 6-~"? PF':ODUCI'ION F'~F"II_F_"
t2-3t ~t--.17-89 INJFCI'ION F'ROFrlLE/TEMF' RUN
~4-2 tt-t8-89 PRODUCI"ION PROFILE RUN
t 4-26 t t-1 8-89 F:'II'$ RUN
16'-~6 tt--'t9'-'89 IF. JECl:[ON F'ROFILF RUN
t '7-~ 4 t t -2~'-'89 F'RODUCI'ION PROFII..E RLIN
t 8-8 t t '"20-'-89 PITS RUN
PI_EASE: SIGN AND REr.'FURN I'HE AI'I'AC;FIE]D COPY AS RECEIF'I' OF' DA
RECEIVEED By~_.___.~_-
HAVE A NICE DAY','
I'~ I,,~ ~, !,,~ '-- --
/,,=,%
,~'~I...I..Y I"IOFF-"ECKE]F:~ ., ...'1~0~ ~F:'F:'ROVED
n'rO-t 529 DEC ].9 _ 89
011 & Gas I ons.
nchorage
DISTRIBUTION
CENTRAL FILES ~ PHIl_LIPS
CHEVRO~ . . PB WELL FILES
D & H"' - R & D
EXTENSION EXF'LORAT I ON ~ BPX
EXXON~
" ~ $['AI-E 0~' ALASKA
MARATHOn" "
.., TEXACO
MOBIL
,:>
t,
t,
t,
t,
t,
t,
t,
t,
t,
t,
t,
t,
i,
t,
'5'
5"
5"
5"
5"
5"
5"
5"
5"
5"
.5 ·
5"
5 ·
~:~..
C A H C 0
C A M C (].1
C A t.~ C 0
CAMCO
CAitCO
C A M C O
C A H C 0 .
C Art C 0
C A M i::: 0
CAMCO
CAHCO
C A M C 0
CAM(](]
C A M C 0
CAM(](]
ARCC~ ALA,?K A.,
P,. O~ BOX 1
ANC'.HORA(;E: ALA,'!';K A 995
R 1!:' F:' Iii: R Iii: N C E ' A R C 0 0 P E N H 0 L E F I N A L ..?
~" '"" ' 9/
_'.. .... ~.:. 1 ~ 8 .... 2 5 / 8 9 6 R & R E $15' T I V I "i'Y ,..."~" "l' 'v' D
I~:' ' ~ ~ .'.~, II
_,"-' 2 t 9 / ~ 8- 2 5 / 8 9 [~ R & R E 5' I :~: T I v :1_' T Y · '~ M D
F:' I... E A,.? E ,.? I 5 N A N D R E T LJ R N 'T' FI E: A'I" T A C H E D C: O P Y A ,x:: R IF:: C E I i::' T 0 F' D A 'f'A,
A N A
ANA
D I 5' T R I B U T I 0 N
~ CENTRAL FILE~'
f,.' C H E V R 0 N
'"' D & M
¢i: EXTEN3'I CiN EXPLCIF.:AT I ON
· .-'"' EXXON
~,~' MA F;.'.A TI-4 ON
~' MOBIl_
· .-'"' F:' H I L L I P 5'
PB WE:L..L.. F'I
~ R & D
~ BF:'X
... $'f'A'f'tE OF AL.A,.";'KA
,il.
.,. '¥EXACO
ARCO ALAYKA, INC.
F'.O. BOX i00560
ANCHORAGE, ALASKA
DATE' i0-9-89
REFERENCE' ARCO CASED HOLE FINAL~
t-7 9--27-89 F'ERF RECORD RUN i
i-2'2 9-2'7-89 F'ERF RECORD RUN
~. i 9-30-89 CBT RUN
7-25 9-20-89 PITS RUN
9-24 9-24-89 LEAK DETECI'ION RUN i
it-8 9/24-25/89 INJECTION PROFILE RUN
~ i -9 ~ ~,~-i -89 F'ERF' RECORD RUN
t4-'25 9-25-89 INJECTION PROFILE RUN
i4-27 9-25-89 INJECTION F'ROFILE RUN
~ 4-52 9-i 0-89 LEAK DE'I"ECTION--REV. RUN
~7-5 9-25-89 PRODUCTION F'ROFILE RUN
t8-24 9-28-89 COMPLETION RECORD RUN
NGI-~ 9-28-89 INJECTION F'ROFII_E RUN
NGI-8 9-29-89 INJECTION PROFILE RUN
PLEASE ,.~'IGN AND RETURN THE .ATTACHED COPY AS' RECEIF'T OF DATA
RECEIVED BY
HAVE A NICE DAY!
~AL_LY FiOFFECKER
AT0-t529
DISTRIBUTION
,$ CENTRAL FILES ~ PI'-t ILL I F'$
· ,,-CHEVRON PB WFLL F'ILES'
D & M R & D
~, EXTENSION EXPLORATION $ BPX
· ,,-"" EXXON $ ,S'I'ATE OF ALASKA
·
MARATHON ~ TEXACO
~ MOBIL
~'CFI
'<2 C, 1--t
~'CH
CAMCO
CAMCO
CAM(](]
~,.,' C FI
CAiqCO
(;AMC(]
CAMCO
CAMCO
CH
£'CH
&~CH
* THE CORRECTED AF'I$ FOR ti-9 I~' 5~2-029-2t4(92,
ARCO ALASKA, INC.
P,. O. BOX
ANCHORAGE, ALASKA 995
DATE' i 0-6-89
REFERENCE' ARCO OPEN HOLE FINAI_~'
5;-2 t 9/t 9-''~ '
~.5/89 EWR-DUAI_. GAMMA RUNS' t-6, '2 &5'
5-2t 9/t9-25/89 CNF'/~'FD-DUAL GAMMA RtJN,? i-6, '2'&5'
F'I..EA$'E SIGN AND REIlJRN THE AI'TACHED Ct A~' KEbEIF'T OF' DATA
RECEIVED BY
HAVE A NICE DA!
SALLY HOF'FECKER
AT0-t529
APF:'R!!VED ~..
TRAN -'. f-
DISTRIBUTION
$ CENTRAL FILES
J'.- CHEVRON
~~ D & M
...
· . EXTENSION EXF'LORATION
EXXON
~1.
~ MARATHON
~ MOBIL
F'HILLIF'$~
F'B WELL. FII. E,S'
R & D
BF'X
STATE OF ALASKA
I'EXACO
ARCO ALA~TKA, INC~
F'~O~ BCIX ~
ANCHORAGE~ ALASKA 995~'~
DATE:: 'i ~-6'"89
RFF:'E]I:(ENC'.E' ARCO HAGNETIC TAF'E(2) WII'FI
.:>-.,.,. t 9/'J 9"-2'5/89 MWD ,..10B:,8909':~0
I-LE.~.J,.~E. ~'IGN AND REI'URN I'HE ATJ~-'~.,HEI) COPY A~' RECEIPT OF' DATA
NL.. 2F:'E
RIECEIVED BY
I-lAVE A NICE DAY!
SAL. L.Y HOF:'F:'E]CK EiR
ATO- ~ .529
E
Anchorage
DISTRIBUTION
CENTRAL FILES (CH)
CHEVRON
D & M
TAMMA$ BROWN (OFI)
EXXON
MARATHON
MOBIL
· .. F'HILLIF'$
PB WEELL. FILE,S'
R & D
-..'"' BF'X
· ..'"' STATE OF ALASKA
TEXACO
DATE.'".: 9""8-89
REF:'ERENCE: ARCO MAGNETIC TAPFZ(~/) WITH LISTING(S)
5-2t 9 .... t-89 DIFL JOB:~3958
PL. EAS'E ,$;IGN AND RETURN THE ATTACFIED COPY A,S' RECEIPI' OF DA'I"A.
!,i'-' C,E I VIED BY
H A V E A N I C E D A Y !
SAI_I... Y FiOFFECKFR
ATO-i 529
CENTRAl_ FIL..E,~ (CH)
C$i.-IEi VRC)N
D & M
TAHMA$; BROWN (OH)
EXXON
MARATHON
MOBIL..
'"' P H I !_ L I !":',.~,'
PB WEL..L FIL. E,S
BF'X
.l~. ,,,! ......
-,- ,sTATP_ OF AL.A,'~'KA
T E X A C 0
ARCO AL. ASKA, IN(]~
F:'~O~ BOX iOOS6(~
ANCHORAG;E, At_ASKA 995t
DATE ~ 9-8-89
I'~t:I-EREN..,E ARCO OF'EN HOLE F"INAI_$
.5:-2 t 9-t "-89 D ]:FI...'"'GF;~ CAI... t PER
5'-2 t 9- t -89 F'MT
F;..'UNi , 2 "&I:S"
RUN t , "2 "&.~"
F' !... E A S E S I G N A N D R E:. f L. R N 1' i'-I r..!; A T "f A C H E D C 0 P Y A,%" R E C E I F' i' 0 F D A "f' A
A '¥' l.. A ,.S'
A"f'I...A S
RFCEIVE:D BY
1-tAVE A NICE DAY!
SALLY HOF:'FECKER
ATO'-t 529
AF'F'ROV['i:D
'TRANS.$ 8 9 ~:~r~'
D I $1'R I BUT ]: ON
-,-'"' CENTRAl._ FILES
'"'~-CI-IEVRON
* D & M
~1. ' · '1. "1 '
... EXTENSION EXFL. ORAIION
T~ EXXON
~~ MARATHON
-~.'~HOBIL
~ PHILLIPS
F:'B WEL. L. F:'IL. EES
'"' F: & D
~..'"' BF:'X
· "' ,,!A!E OF: AI..ASKA
· ,- TEXACO
MEMORANDUM State Alaska
ALASKA OIL A~ND GAS CONSERVATION COMMISSION
TO: Lonnie C. Smit~,?-~-J~''/~ DATE: September 6 1989
Commissioner ~ ~ v '
FILE NO: D. BDF. 091
THRU:
FROM:
TELEPHONE NO:
Michael T. Minder ~"~~' SUBJECT:
Sr. Petroleum Engineer
Bobby D. Foster
Petroleum Inspector
BOP Test
AAI PBU DS 5-21
Permit No. #89-90
Prudhoe Bay Field
Saturda~l, Augpst 26, 1989, The test began at 8:00 pm and was
~U-d-e-~-'A~'-'r~~~-~ the attached BOP test report shows there
was one failure which was repaired and tested.
In summary, I witnessed the BOP test on AAI's DS5-21.
Attachment
02-001A (Rev. 8/85)
General llousekeeping~Rig ,
Reserve Pit ,.-.-'/'
H.ud, Systems Visual Audio
Trip Tank
Pit Gauge
Flow Honitor
Cas Detectors
STATE OF ALASKA
ALASKA OIL & GAS CONSERVATION COMMISSION
B.O.P.E. Inspection Report
Location. General.._ ~ _Well Sign ~_ ACC~LATOR SYST~
. Full Charge Pressur~ ~~
Pressure After Closure
BOPE Stack Test Pressu. r[ ;.''Upper KellX /
, / ~'-O~O Lower Kelly._ / '
Annular Preventer ,,.~O/
Pipe Rams ~,,/ ~ _._. [":
~0¢o Ball Type
Pump incr. clos. pres. 200 psi~
· ~-
Full Charge Pressure Attained:.../ min~'~pec.
Controlsl,Haster
Remote t..x~glinds switch cover
Kelly and Floor Safety Valves .
psig .
psig
Blind Rams
_
Choke Line Valves
_ ,,
Test Pressure. ~Oq.,/~5-~'°0
Test Pressure ~o~/~-~oo
II.C.R. Valve
,
Kill Line Valves
Check Valve
Test Results: Failures /
Repair or. Replacement of failed equipment to be made within day~ and Inspector/
Commission. office notified. '
.......
+ . .,. · ,
Inside BOP [ , Test Pressure
.Choke Hanifold~Test' Pressure~,~,;o//,~,
No. Valves ) ~ '
· ~ - ~
uo. fhng.~.,, ~
Adjustable Chokes ~. ,
Hydrauically operat~' choke } '
Test T~e ~ hrs.
Distribution
orig. - AO&GCC
cc -Operator
·
cc Supervisor
August 16, 1989
Telecopy..
(907)276-7542
l~kr. R. B. Grem%ey
Regional Drilling Engineer
ARCO Alaska, Inc.
P. O. Box 100360
Anchorage, Alaska 99510-0360
P~dhoe Bay Unit DS 5-21
ARCO Alaska, Inc.
Permit No. 89-90
Sur. Loc. 1969'FSL, 1244'FWL, Sec. 32, TllN, R15E, UM.
Btmhole Loc. 530'FNL, 2725'FWL, Sec. 5, T10N, R15E, UM.
Dear Mr. Gremley:
F~uclosed is the approved application for permit to drill the
above referenced well.
The permit uo drill does not exempt you from obtaining additional
permits required by law from other governmental agencies, and
does not authorize conducting drilling operations until all other
required permitting dete~inations are made.
To aid us in scheduling field work, please notify this office 24
hours prior to commencing installation of the blowout prevention
equipment so ghat a representative of the Commission may be
present to witness testing of the equipment before the surface
casing shoe is drilled. Where a diverter system is required,
please also notify chis office 24 hours prior to co~encing
equipment installation so that the Commission may witness testing
before drilling below the shoe of the conductor pipe.
V~ tr .ly ~you~.s,
I' ",.,2
C. V. Chattert°n
Chair~n of
Alaska Oil and Gas Conservation Co~ission
BY O~ER OF THE COFR~IISSION
dlf
Fa%closure
cc: Department of Fish & Game, Habitat Section w/o encl.
Depart~nt of Environmental Conservation w/o encl.
STATE OF ALASKA
- ALASK~ ilL AND GAS CONSERVATION ( 'VIMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work Drill ~ Redrill []1 lb. Type of well. Exploratory [] Stratigraphic Test [] Development Oil
Re-Entry [] Deepen[]1 Service [] Developement Gas [] Single Zone [] Multiple Zone []
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
ARCO Alaska, Inc. RKB 68', PAD 36'GL feet Prudhoe Bay Field
3. Address 6. Property Designation Prudhoe Bay Oil Pool
P.O. Box 100360, Anchorage, AK 99510-0360 ADL @ TD
4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025)
1969'FSL, 1244'FWL, Sec.32, TllN, R15E, UM Prudhoe Bay Unit Statewide
At top of productive interval (@ 9048'TVD) 8. Well nurpber Number
320'FSL, 3030'FEL, Sec.32, T11N, R15E, UM DS 5-21 U-630610
At total depth 9. Approximate spud date Amount
530'FNL, 2725'FWL, Sec. 5, TION, R15E, UM 08/23/89 $200,000
12. Distance to nearest 13. Distance to nearest well 14. Number of acres in prOperty 15. Proposed depth(MD and TVD)
property line DS 5-6 60' 11157'MD
0 ~ 10518'MD feet surface feet 2560 9022'TVD feet
16. To be com~e,~.c~ .if.~_Ddeviated wells 91 5° 17. Anticipated pressure (see 20 AAC 25.03S(e)(2))
Kickoff depth'~- feet Maximum t~ole angle 0 Maximum surface 2800 psig At total depth (TVD) 3700 psig
18. Casing program Settin~l Depth
size Specifications Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
30" 20" 91.5# H-b.O Weld RO' _~0' 30' 110' 110' 2000# Poleset
17-1/2" 13-3/8" 68# K-55 BTC 20' 30 ' 30 ' 50 ' 50 ' 1600 ~,x CS I I I &
68# L-80 BTC ~-950' 50' 50' 3000' 3000' 600 sx CS G
12-1/4" 9-5/8" 47# -80 BTC/Mod ]596' 30' 30' 8626' 8488' 500 sx Class G
8-1/2" 7" 29# L-80 BTC 831' 8326' E250' 0157' 9048' 350 sx Class G
"-8-1/2" 4-1/2" 11.5#L-80 FL4S 1250' 9907' 9020' 11157' 9022' Slotted liner
~otal oeptn: measureo tee[ ~qugs Imeasureo~
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented Measured depth True Vertical depth
Structural
Surface
Intermediate
Production
Liner
Perforation depth: measured '
true vertical
20. Attachments Filing feelJ;~'" Property plat [] BOP Sketch [~Diverter Sketch 5~'Drilling program
Drilling fluid program [~"l'ime vs depth plot [] Refraction analysis [] Seabed report [] 20 AAC 25.050 requirements
21. I hereby certify that the foreg, eing i~ true and correct to the best of my knowledge
Signed~//~~,.,~ Title Rea ional Dr illi no_ Eno-ineer' Dater'S////~
Commission UseOnly (JLH) PD3/087 ~'
~'~'..- ~:~ 50--0,2.9- Z/?~' ~ 08/16/89 for other requirements
Conditions of approval Samples required [] Yes ~i["No Mud log required L--J Yes /~No
Hydrogen sulfide measures [] Yes '"~No Direction~' 'al survey required 'J~"Yes [] Nb
Required workin.q,.pj'essu.re for B_O, PE/' 1~2.M; [] 3M; I~ 5M; [] 10M; ~ 15M
Other: Y/"~///~/~'/Z
Approvedl~ .,;_f, (,. /"~~,~ Commissioner the commission Dat
Form 10-401 Rev. 12-1-85
~ / Sub~ icate
PBU DS 5-21
OPERATIONS SUMMARY
1. MIRU drilling rig. NU diverter and function test same.
2. Spud well and drill a vertical 17-1/2" hole to 3000'MD/TVD.
3. Set 13-3/8" casing and cement same. Test casing to 2500 psi for 30 minutes. Nipple
up BOPs and test to 5000 psi.
4. Pick up 12-1/4" bit and BHA. Drill 10' of new hole and perform leakoff test. Drill
vertical 12-1/4" to 7192' TVD / MD (KOP). Build angle at 3.09°/100' at S 30° 39'E
to 8488' TVD / 8626' MD (10' TVD above the top of the Sadlerochit). Angle at this
point should approximately 40°.
5. Set 9-5/8" casing and cement same. Test casing to 3000 psi for 30 minutes.
6. Drill 10' of new 8-1/2" hole and perform formation integrity test to 12.5 ppg EMW.
Switch to oil base mud, then drill 8-1/2" hole continuing to build at 3.09°/100', to
9048' TVD / 10157' MD (EOC). The angle should be 91.5° at the end of the curve.
Maintain angle and direction until TD at 9022' TVD, 11157' MD. Note: While
drilling, the Sadlerochit will be logged with MWD tools as per program.
7. RIH and spot polymer/salt pill at the 7" liner point at 9048' TVD / 10157' MD. Note:
7" liner point may change due to the depth of the GOC.
8. Run and set the 7" liner with an external casing packer above the 7" shoe.
9. Clean out the liner and pressure test to 3000 psi for 30 minutes. RIH with drill pipe
conveyed cement evaluation logs.
10. Clean out the open hole to TD.
11. Run and set the packer and 4-1/2" slotted liner across the open hole.
12. Run 3-1/2" x 4-1/2" tubing with 8 GLMs at appropriate depths. Pressure tubing to
3000 psi.
13. Nipple up tree. Displace the tubing with diesel and the tubing x 9-5/8" annulus with
9.0 ppg NaC1 brine down to the GLM at 9000' TVD.
14. Release drilling rig.
PBU DS 5-21
OPERATIONS SUMMARY CONT.
NOTE:
a.
Excess non-hazardous fluids developed from well operations and as necessary to
control fluid level in reserve pit will be pumped down the 9-5/8" x 13-3/8"
annulus. The annulus will be left with a non-freezing fluid during any extended
period. The annulus will be sealed with 300 sx of cement followed by Arctic Pack.
b. Wells within 200' of the proposed well are:
DS 5-6 60' @ Surface
DS 5-5 106' @ 3000' TVD / MD
DS 5-3 172' @ 4300' TVD / 1628' MD
Ce
The drilling fluid program and fluid surface system will conform to the regulations set
forth in 20AAC25.033.
d,
Maximum surface pressure is based upon BHP and a full column of gas to TD (0.10
psi / ft).
e.
Based upon previous logs on DS 5, no potential productive zones are anticipated
above 4000' TVD.
f. No potential hazardous levels of H2S are anticipated in this well.
..... TVD--
:~t3_.3ZS,___ CSG..PT TVD~,~--.-~IO0 , · ~
K-15 TV0=4783
MAXIMUM ANGLE'·
gl-~ DE(i--30 · MIN'
..... ?oo~., K-tO T_VQ~Zl,.18 ......
KOP TVD-7192 TMD=7192 DEP=O
K-5' TVD-?Z08 TMD=Z?15 DEP-Z3
LCU TVD-8328 THD-8414 DEP-388
SAG RIVER TVD-8393 THD=8498 DEP-441 .
BUILD..3.09
........................ SHUBL-[K ..... TVD-8429 THD-8546 DEP-4Z2.,
PER 100 FT- 9 5/8 i CSO PT TVD-8488 TMD-8626 DEP-52Z
................. ~/0 CONTACT. TVD 894:3 TMI] 9479 DEP-!1239
HOT / EOC ' TVD 9048 THI] 10157 DEP-1905
TARGET:CNTR TVD-9035 TMD-10657 DEP-2405
, ' ' ~ -' TD'/'-4~1/2 .......... '~ ................. ~, .....
Iooo 2000
VERTIOAL SECTION:
SLOTTE~ LINER TVD-9022 TMD-11157 DEP'-2905
HORIZOK ~L
SCALE 1 IN.
PROJECTION
= ! 000 FEET
ARCO ALASKA.
D.S, $. Well
Prudhoe Bay.
No' 21 Propoeed
North Slope, Alamke
1000
SURFACE LOCAT I ON ~
Igsg' FSL. 1244' FWL
SEC. 32. TllN. RISE
1000
2O00
3000
1 000
WEST-EAST
0
I
1 000
2OOO
I
TARGET
TVD=9035
TMD=I06$?
DEP-2405
SOUTH 2069
EAST 1226
TD LOCATION'
530' FNL' 2725' FWL
SEC. 5. TION. R15E
TARGET LOCAT I ON '
100' FNL. 2470' FWL
SEC- 5. T!ON. RISE
S JO
2405'
DEG 39 HI N E
(TO TARGET)
DS 5-21
MUD PROGRAM
DEPTH DENSITY FUNNEL YP INT. 10 min
(TVD) (PPG) VIS (#/100sqft) GEL GEL
FL OIL SOLIDS TYPE
(cc/30min) % %
Surf 8.8 100 40
to to to to
13-3/8" 9.2 250 70
Csg Pt.
30+ 50+
25 0 8
Gel - Benex
Spud Mud
DEPTH DENS1TY PV YP INT. 10 min
(TVD) (PPG) (CP) (#/100sqft) GEL GEL
FL OIL SOLIDS TYPE
(ce/30min) % %
13-3/8" 8.8 Minimum 2 2 4 25
to to Possible to to to to
K-10 9.6 4 4 10 10
K-10 9.6 10 6 2 4 8 2
to to to to to to to to
9-5/8" PT 10.4 20 10 4 10 6 5
2 Low Solids
to Non-Dispersed
6
4 Low Solids
to Non-Dispersed
15
DEPTH DENSITY PV YP INT. 10 min FL OIL
(TVD) (PPG) (CP) (#/100sqft) GEL GEL (cc/30min) %
SOLIDS TYPE
%
9-5/8" 8.7 10 15 8 8 7 85 10
to to to to to to to to to
TD 9.2 20 25 10 20 8 90 15
Oil Base
The above properties are to act as a basic guidline, actual fluid properties are to be adjusted to the hole conditions
encountered.
NABORS 28E
MUD SYSTEM
SAND TRAP
4 BBLS
PIT #1 TRIP TANK
130 BBLS 170 BBLS
PIT #2 PIT #3
81 BBLS 137 BBLS
PIT #5
117 BBLS PIT #4
179 BBLS
PILL PIT
20 BBLS
PIT #6
135 BBLS
EQUIPMENT - DRILLING FLUID SYSTEM
(3) DERRICK FLO LINE CLEANER PLUS SHAKERS
(1) DERRICK MUD CLEANER
(1) BRANDT CF-2 CENTRIFUGE
(1) PIONEER MARK 1 CENTRIFUGE
(1) DRILCO DEGASSER
(1) DACRO GAS BUSTER
ONE PVT SENSOR PER PIT (with both visual and audio warning devices)
ONE AGITATOR PER PIT
DRILLING FLOW SENSOR (with readout convenient to the driller's console)
GSW 4/7/89
13-5/8" 5,,00 PSI
BOP STACK. I AGRAM
ACCUMULATOR CAPACITY TEST
,, I I
REYENTER J
PI PE RAHS
,I
I
BLI ND RAHS
,!
DRILLING
SPOOL
PI PE RAHS
~ ~ ' 1~-:~/8"
I.,4
~ HEAD
ALL BOP EQUIPMENT
5000 PSI RATED
1. CHECK AND FILL ACCUMULATOR RESERYOIR TO PROPER LEYEL
WITH HYDRAULIC FLUID.
2. ASSURE THAT ACCUMULATOR PRESSURE IS $000 PSI WITH
1500 PSI DOWNSTREAM OF THE REGULATOR.
$. OBSERYE TI ME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND
RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS
ARE CLOSED WITH CHARGING PUMP OFF.
4. RECORD ON IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS
45 SECONDS CLOSING TI ME AND 1200 PSI REMAINING PRESSURE.
13-5/8" BOP STACK TEST
1. FILL BOP STACK AND MANIFOLD WITH A NON-FREEZING LIQUID.
2. CHECK THAT ALL HOLD DOWN SCREWS ARE FULLY RETRACTED.
MARK RUNNING JOINT WITH PREDETERMINED PLUG SEATING
DEPTH. RUN TEST PLUG ON DRILL PIPE AND SEAT IN WELLHEAD.
R U N I N LOC K DOW N SC R EWS.
$. CLOSE ANNULAR PREYENTER AND UPSTREAM YALYES.
4. FUNCTIONALLY TEST CHOKES.
5. IN EACH OF THE FOLLOWING TESTS, FIRST HOLD A 250 PSI LOW
PRESSURE TEST FOR A MINIMUM OF $ MINUTES, THEN TEST AT
THE HIGH PRESSURE.
6. INCREASE PRESSURE TO $000 PSI AND HOLD FOR A MINIMUM
OF $ MINUTES. BLEED PRESSURE TO ZERO.
7. OPEN ANNULAR PREYENTER AND CLOSE TOP SET OF PIPE RAMS.
INCREASE PRESSURE TO 5000 PSI AND HOLD FOR AT LEAST
$ MINUTES. BLEED PRESSURE TO ZERO.
8. CLOSE YALYES DIRECTLY UPSTREAM OF CHOKES AND OPEN
CHOKES. INCREASE PRESSURE TO 5000 PSI AND HOLD FOR AT
LEAST $ MINUTES. BLEED PRESSURE TO ZERO.
9. OPEN TOP SET OF PIPE RAMS THEN CLOSE BOTTOM SET OF
PIPE RAMS. INCREASE PRESSURE TO 5000 PSI BELOW THE
BOTTOM SET OF PIPE RAMS AND HOLD FOR AT LEAST $ MINUTES.
10. TEST REMAINING UNTESTED MANIFOLD YALYES (IF ANY) WITH
5000 PSI UPSTREAM OF YALYE AND ZERO PRESSURE DOWN-
STREAM.
11. BLEED PRESSURE TO ZERO. OPEN BOTTOM SET OF PIPE RAMS.
lZ. BACK OFF RUNNING JOINT AND PULL OUT OF HOLE. CLOSE BLIND
RAMS AND TEST TO 5000 PSI FOR AT LEAST $ MINUTES.
15. BLEED PRESSURE OFF ALL EQUIPMENT. OPEN BLIND RAMS.
MAKE SURE MANIFOLD AND LINES ARE FULL OF NON-FREEZING
LIQUID AND ALL YALYES ARE SET IN DRILLING POSITION.
14. TEST STANDPIPE YALYES TO 5000 PSI.
15. TEST KELLY COCKS AND INSIDE BOP TO 5000 PSI.
16. CHECK OPERATION OF DEGASSER.
17. RECORD TEST INFORMATION ON BLOWOUT PREYENTER TEST
FORM. SIGN AND SEND TO DRILLING SUPERYISOR.
18. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNC-
TIONALLY OPERATE BOPE DAILY.
NABORS 28E DIVERTER SYSTEM
ARCO ALASKA, INC.
SCHEMATIC
FILL-UP LINE
I
RISER
I FLOWLINE
20"
2000 PSI
DIVERTER
10.7 BALL VALVE
10.7 BALL VALVE
I
CONDUCTOR
NOTE'
ONLY ONE VALVE OPENS AUTOMATICALLY WHEN THE DIVERTER CLOSES.
THE SECOND VALVE WILL REMAIN CLOSED UNLESS CONDITIONS REQUIRE
THE USE OF THE SECOND VENT LINE. THE SECOND VENT LINE VALVE CAN
BE OPENED USING CONTROLS LOCATED AT THE ACCUMULATOR. THIS IS
A VARIANCE FROM 20AAC25.035
RESERVE PIT
lO" VENT LINE
WELL
10" VENT LINE
DIVERTER LINES DISCHARGE 100' FROM RIG IGNITION SOURCE.
ALL TURNS ARE 90° TARGET TEES.
CHECK LIST FOR NEW WELL PERMITS
ITEM APPROVE DATE
(2) Loc (~n'~ru
8)
(8)
(3) Admin ~f~ ~/~ 9.
'(9 thr'u~ 10.
(10 and 13) 12.
13.
(4) Casg ~,~,~,'
(14 thru 22)
(23 thru 28)
Company
Is the permit fee attached ..........................................
2. Is well to be located in a defined pool .............................
3. Is we,l] located proper distance from property line .................. ~
4. Is we~ located proper distance from other wells ....................
5. Is suziicient undedicated acreage available in this pool ............ ~
6. Is well to be deviated and is wellbore plat included ................
7. Is operator the only affected party .................................
8. Can permit be approved before fifteen-day wait ......................
Lease & Well No. ~
YES NO
REffAm~S
Does operator have a bond in force .................................. ~
Is a conservation order needed ......................................
Is administrative approval needed ...................................
Is the lease number appropriate ..................................... ~
Does the well have a'unique name and number .........................
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
Is conductor string provided ........................................
Will surface casing protect all zones reasonably expected to
serve as an underground source of drinking water .....................
Is enough cement used to circulate on conductor and surface .........
Will cement tie in surface and intermediate or production strings ...
Will cement cover all known productive horizons .....................
Will all casing give adequate safety in collapse, tension and burst..
Is this well to be kicked off from an existing wellbore .............
Is old wellbore abandonment procedure included on 10-403 ............
Is adequate wellbore separation proposed ............................
Is a diverter system required .......................................
Is the drilling fluid program schematic and list of equipment adequate~
Are necessary diagrams and descriptions of diverter and BOPE attached.~-~
Does BOPE have sufficient pressure rating - Test to ~~ psig .. ~
Does the choke manifold comply w/API RP-53 (May 84) ..................
Is the presence of H2S gas probable .................................
(6) OTHER ~p~ ~ir'/Gb//~
'(29 thru 31)-'
(6) Add: ~.~~ f~-)~'...f~
Geology: En~ineerin~:
DWJ-i~-t---- ~~BEW --
For
30.
31.
32.
rev: 01/30/89
6.011
exploratory and Stratigraphic wells:
Are data presented on potential overpressure zones? .................
Are seismic analysis data presented on shallow gas zones ............
If an offshore loc., are survey results of seabed conditions presented
Additional requirements .............................................
INITIAL GEO. UNIT ON/OFF
POOL CLASS STATUS AREA NO. SHORE
o
~z
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history, file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX. ,
No special effort has been made to chronologically
organize this category of information.
(NOTE:
** REEL HEADER **
**** LIS READ ****
MAXIMUM RECORD LENGTH - 8192 BYTES)~-
REEL SEQUENCE # 1 (~
SERVICE NAME: SPERRY
DATE: 89/10/04
ORIGIN OF DATA: MWD
REEL NAME: ARCO
CONTINUATION #: 01
PREVIOUS REEL NAME:
COMMENTS: PETROLEUM COMPUTING INC.- LIS FORMAT
** TAPE HEADER **
SERVICE NAME: RLL
DATE: 89/10/04
ORIGIN OF DATA: 5-21
TAPE NAME: PBU/EOA
CONTINUATION #: 01
PREVIOUS TAPE NAME:
COMMENTS:
PETROLEUM COMPUTING INC.- LIS FORMAT
********** END OF FILE **********
i ICI OFILHED
** FILE HEADER **
FILE SEQUENCE # 1
FILE NAME: D.S. 5-21
SERVICE NAME: RLL
VERSION #: V2.3D
DATE: 89/10/04
MAX. RECORD LENGTH:
FILE TYPE: EO
PREVIOUS FILE NAME:
1024
** DATA FORMAT SPECIFICATION **
ENTRY BLOCKS
TYPE SIZE REP CODE ENTRY
4 1 66 255
0 1 66
DESCRIPTION
LOG DIRECTION, DOWN
TERMINATOR (NO MORE ENTRIES)
DATUM SPECIFICATION BLOCKS
NAME SERVICE SERVICE UNIT API API API API
ID ORDER#
DEPT
GRC MWD
EWR MWD
FXE MWD
ROP MWD
NF0 MWD
NFl MWD
NN0 MWD
NN1 MWD
GRCR REPEAT
EWRR REPEAT
FXER REPEAT
RATE REPEAT
NFOR REPEAT
NF1R REPEAT
NNOR REPEAT
NN1R REPEAT
CALR REPEAT
NPSC MWD
CAL MWD
DRHO MWD
TVD CALC
NDIS ANADRL
EDIS ANADRL
DEVI ANADRL
DRHR REPEAT
DPSR REPEAT
DPSC MWD
NPSR REPEAT
FILE SZE PROC SPL REPR
LOG TYP CLS MOD NO.
FT 0 0 0 0 1
AAPI 0 0 0 0 1
OHMM 0 0 0 0 1
HOUR 0 0 0 0 1
FT/H 0 0 0 0 1
CTS 0 0 0 0 1
CTS 0 0 0 0 1
CTS 0 0 0 0 1
CTS 0 0 0 0 1
~_API 0 0 0 0 1
OHMM 0 0 0 0 1
HOUR 0 0 0 0 1
FT/H 0 0 0 0 1
CTS 0 0 0 0 1
CTS 0 0 0 0 1
CTS 0 0 0 0 1
CTS 0 0 0 0 1
INCH 0 0 0 0 1
P.U. 0 0 0 0 1
INCH 0 0 0 0 1
G/C3 0 0 0 0 1
FT 0 0 0 0 1
FT 0 0 0 0 1
FT 0 0 0 0 1
DEG 0 0 0 0 1
G/C3 0 0 0 0 1
P.U. 0 0 0 0 1
P.U. 0 0 0 0 1
P.U. 0 0 0 0 1
LVL CODE
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
4 0 1 68
** DATA FORMAT SPECIFICATION **
TYPE SIZE REP CODE
4 1 66
0 1 66
ENTRY BLOCKS
ENTRY DESCRIPTION
255 LOG DIRECTION, DOWN
TERMINATOR (NO MORE ENTRIES)
DATUM SPECIFICATION BLOCKS
NAME SERVICE SERVICE UNIT API API API API FILE SZE PROC SPL REPR
ID
DEPT
GRC MWD
EWR MWD
FXE MWD
ROP MWD
NFO MWD
NFl MWD
NN0 MWD
NN1 MWD
GRCR REPEAT
EWRR REPEAT
FXER REPEAT
RATE REPEAT
NFOR REPEAT
NF1R REPEAT
NNOR REPEAT
NN1R REPEAT
CALR REPEAT
NPSC MWD
CAL MWD
DRHO MWD
TVD CALC
NDIS ANADRL
EDIS ANADRL
DEVI ANADRL
DRHR REPEAT
DPSR REPEAT
DPSC MWD
NPSR REPEAT
ORDER#
L0G TYP CLS MOD NO. LVL CODE
FT 0 0 0 0 1 4 0 1 68
AAPI 0 0 0 0 1 4 0 1 68
OHMM 0 0 0 0 1 4 0 1 68
HOUR 0 0 0 0 1 4 0 1 68
FT/H 0 0 0 0 1 4 0 1 68
CTS 0 0 0 0 1 4 0 1 68
CTS 0 0 0 0 1 4 0 1 68
CTS 0 0 0 0 1 4 0 1 68
CTS 0 0 0 0 1 4 0 1 68
AAPI 0 0 0 0 1 4 0 1 68
OHMM 0 0 0 0 1 4 0 1 68
HOUR 0 0 0 0 1 4 0 1 68
FT/H 0 0 0 0 1 4 0 1 68
CTS 0 0 0 0 1 4 0 1 68
CTS 0 0 0 0 1 4 0 1 68
CTS 0 0 0 0 1 4 0 1 68
CTS 0 0 0 0 1 4 0 1 68
INCH 0 0 0 0 1 4 0 1 68
P.U. 0 0 0 0 1 4 0 1 68
INCH 0 0 0 0 1 4 0 1 68
G/C3 0 0 0 0 1 4 0 1 68
FT 0 0 0 0 1 4 0 1 68
FT 0 0 0 0 1 4 0 1 68
FT 0 0 0 0 1 4 0 1 68
DEG 0 0 0 0 1 4 0 1 68
G/C3 0 0 0 0 1 4 0 1 68
P.U. 0 0 0 0 1 4 0 1 68
P.U. 0 0 0 0 1 4 0 1 68
P.U. 0 0 0 0 1 4 0 1 68
** 651 DATA RECORDS **
FROM 8400.00 TO 11000.00 FT
** FILE TRAILER**
FILE NAME: D.S. 5-21
SERVICE NAME: RLL
VERSION #: V2.3D
DATE: 89/10/04
MAX. RECORD LENGTH:
FILE TYPE: EO
NEXT FILE NAME:
1024
** TAPE TRAILER**
SERVICE NAME: RLL
DATE: 89/10/04
ORIGIN OF DATA: 5-21
TAPE NAME: PBU/EOA
CONTINUATION #: 01
NEXT TAPE NAME:
COMMENTS: PETROLEUM COMPUTING INC.- LIS FORMAT
** REEL TRAILER **
SERVICE NAME: SPERRY
DATE: 89/10/04
ORIGIN OF DATA: MWD
REEL NAME: ARCO
CONTINUATION #: 01
NEXT REEL NAME:
COMMENTS: PETROLEUM COMPUTING INC.- LIS FORMAT
Start of execution: Tue 5 SE? ¢~ 7:450
2?-?°
LZS
8910110
ATLAS
01
'LIS CUSTOMER
LiS
01
'OPEN HOLE WITH DIF-L: M&ZN ~:, RE~5$,T'
FILE ~ 1
MAiN ,001
***~ mILE HEADER ****
1024
WN
FN
COUN
STAT
: &RCO ~,LASKA/ iNC
: D.S. 5-21
: mRUDHOE BAY
: NORTH SLOPE
: A' ~SKA
L~. ,
, FORM&T R~CORD (TYD~ 54)
ONE DEPTH DER FRAME
;B CURVES :
! SP'
2 GR
3 CAL
TTEN
CHT
R~tM
~ILD
6k.
1 MV
I Ami
I iN
1 L~
! L$
t OHMM
I O~MM
I OHMM
~YTES
DEPT~
71 29. 000
O. 0 ~O000O
7079,000
70~9,000
867, t 1 35
59'79, OOC
873.6277
5~29
864. ~ :~
882.4t99
8~8 · 4~63
6729.003
6~29.000
803. 3806
~579.000
8~1.4414
6529 · OOO
~¢2.953t
6479 0en
6429.00,3
925. 553S
6~79.00~
93,5.3457
~53.52~S
955.9941
~179.000
(Ty~=~
SP
u.~O000~
3.155922
-4 ,,.q 9a 066
3. 542247
-¢' ' .. .39
:~.7353.~
-t .1 '35805
3,!C7!50
-l. 3r* ?01 S
-2. 2309e-.7
.-: m . ; · ,
3,449564
-1 .344818
x 21 ~xaO
-1.05504z,
3.855830
-32.80824.
x A/-,.,:,.t 57
-S, 64'" ' 21,~¢ a.
-~* S970e
-!0.. t 8976
~44
-70..a7551
3.175~11
-23.!5~3'~
~'. 51
- ! 6.54 26;5
-xl )~07o
- ? 'S. 2 c ;~-< 45
- ~ .
O)
1014 BYTES
~ .'r LM
0.00.300.3.3
O. 200000C)
.,..~
u. o~non, OQ
2.~74457
140.8295
3.275930
04.21996
2.32~160
109.~907
,~.7~xO7x
95.73! 4~
2 5~7566
~c ~245
'5.1055;7
9~ 793'ot
~.~ ~ ~ ..,
5.131635
8~.6t443
2.7-~3635
77,o1622
3,54~314
2,~54457
~5 . 85237
~ ~'71 272
54.17972
;' ~54754
94.~7255
I .~005~8
¢9.11
7'~ 27~34
7~.5343C'
C2L
RiLO
10.00000
~O00OO0
11 · 2/-,,.1.57
2. 487231
1 2.61 667
3. 40395,7
12.62600
2. 2254:52
1 2,731 ~e
2. 629069
. '~4 563
2.514970
1!.75557
1Z,7312S
3, !~7.].~6
17,~15~7
2.750~43
12.47o9~
3.314283
12.61904
2.695052
1 2 ~3 ~9
i '~'
12
2.5024~3
7.914;33~
2 =1 046v
1 2 ~750
1.34~59P
13.ZZ634
3.323872
1 ~ 732=1
5.0 c, 344 $
1 ~ 54c, 5'~
i.410462
4. 000667
TT ~N
I 5 O0. CO0
3334.624
331 3. 300
3316.040
3280.65C
,'~1 .10~
~. ~.~ : i ~ ,'
3232.g~6
3214.705
324'~.1~1
3172.602
3160.917
3322.110
3153.7'J. 5
3157.163
313~.424
3134.996
31 ? c. 4 ,~
312_;..u, ~
~05f
914.0~3O
60?9.000
910,, 674 ~?~
60R9.0~-0
r~61 1 06~n
5979. 000
9~4.6106
59~9.000
'~33,6504
~37,6065
58Z9.000
9 ~3 · 3340
S779.000
9~Z.6907
940.7366
5679.uL~0
950. 8003
56 ~9. 000
9C5 .S73S
5S79,00rd
997.1365
9~t .0630
5479,008
9~5}.998~
5 379. 000
937.55~
5389.000
978.7114
5279,000
52 !9,0,,.30
'032.273~
5179.
945.30~6
938.772~
5079.000
-54 oa07
3, '~ :~ ;~ 563
- z n
~ ?.1 o~2S
~.I 27207
-tl.03355
3.215227
3.2123C0
-~ 7~3G~
3.232726
-74,~11
3.52~327
-1 o 1 67~1
3. 562213
4.785227
-~,6~1~04~
3,38541!
-lO,t~2~0
3.073711
3,1 75063
-29,!¢617
= ~1 ~64~
-1 .770~6~
5.665475
4,1~J64~
-~ 11249~
5,79868!
3,225756
3,78~74~
-g'~..
4, t I 0t 08
-7,0~{4421
S 6~1484
-5-~, ~23
~1,243~5
! ,776432
2,122716
62,0419~
2,770~49
=F,4738=
2.311311
58.17m0~
2.150360
44,25709
2,~54168
28,87967
! .0251~u~
60,64177
50. ~'~
~4. 23364
2,g40094
47,9t~11
~,47929
2,14~35.57
46 t
2,222795
6~,75374
34,89557
1
79,1~073
3,6~16.30
73,4 'Z097
i ,~3675C-
57,54573
2.334482
54.g~gg9
~,5301~
?.2,601 46
51
12.05067
1. z. 7 '228 'c
! .463~11
1 3. 00051
,- 0~3321
13.73027
? .~08389
1 Z. 1 31 09
? .05~945
13.22801
2. 045 ~ 97
14.d9905
2.2663~5
1 ? · ~ 551 5
0.8134942
12.~5516
2.775744
12.73125
2.260519
13.64~33
P 774~ 50
1 ~ 9505m
2.1273g~
I 7. B7375
I .723160
14.24031
1 .77420e
14.57940
3.2~0267
1 3. 07500
1 .172881
1 4. :~71 22
4 . 048611
14.272~0
2.961977
14.2158,0
1. 964812
13.48756
~.1~2546
1 3.7~25O
3 . 4E:6765
14.69 S B 3
3032.~72
29 o ~,
~,~. 444
30~4.751
2999.013
2962.795
296t .978
2901 .06g
2935.125
~8~6.'~70
2588. ,5~1
2~67.56~
2~11.542
? ~ 77.29
2775.519
2824.417
2777,952
2724.72~J
20!~6.461
~ :9. uOu~
939.37!3
4979,
U
4929,000
999,0'~45
4.879,000
953.
4779 n~
4729.000
~679.000
4~29,000
9~7,216~
4579,000
9~0,4~4J
4529.000
9 ~ 7.16
9~6
C4~9.00~
9~7.~m
4379.000
9C4.159~
C329
9Z7.515~
4~9.000
710.567~
948,4~07
4179.000
9F3
cZg ~804
4079,000
94~
3979.000
-28.50565
4,2~85t 3
-31, ~,2276
4 5,01 07~,-..'~
-15.00023
-66.62455
-2~.642~0
-19,36810
4 50777~
-30,17747
4,710455
-~ ~373Zg
3
-16,74!83
4, ~x99~
-J 2,6~ 907
~,2~045.6
-53,~9792
5.405642
-3~ ~1
5,64!10~
-23,11183
4,673770
-23,4148t
4,857642
- S 5. 63190
5 ~18~.Q7
-52,11413
-~ ~ 77~8'~
~,90g290
-!a,50533
-P S 60'ml 3
5.916793
-2! .336~~
5t, ~.z. 969
3. 056190
.... u .:.~ 572
3.1 4S$77
01 .03at8
3. '3m .~7~ 1
,.2 ~
.... u21954
55.32877
4.016453
A~ 07~Q9
4 o~ 5820
57, ~5580
4,0750B7
.-' i ~-~ ~ ',~'
6!. 7o01 5
3.6~7246
71.67627
4.199076
38 0~65
3.245426
a9.3~6~9.
4.31 3536
71 .~6~'
~ 63~071
~ 570'~1 ~
c~ ~6073
~ 3~4~7~
41 ,70003
3.66o45~,
64,35591
4,703906
~3,~9733
4 0'-~ .
~.~ 'x1555
5. 499977
6~ 7n~
5,5 ~ 6463-
67,~36514
13.43.~90
2.~32224
12,96237
2,676891
1/-.,,. 0'9 o ~ 5
3.317o53
15,252ZC
1,449~62
13.02972
3.62§393
14.95879
4.655099
! 3.07500
3.581569
13.79576
3. 59432~
14.07242
3.778441
1 3.60567
4.69661Z
t3.7436.7
2.~xqO~l
1~.845~3
~ 611P0~
13.97647
5.095517
14.19572
5,147443
12,84305
4,954661
!2.61~67
2 ,~46465
13.6C711
4 4202~7
1 4. 99340
q 01 0~99
13.315~7
.5.844419
t3.07500
5,412679
13.07503
~. 41 7~1 $
t 3. 071 3~
2a77.838
z62e,.22o
2674.17o
2~Ol 6c4
25..05 .,579
25~q4,417
~5.$! .471
p5o4 7=,,°
2527.~1
~4~0.05~
2495.~27
2471 .541
24~7.115
~454.135
2432
2444.~[{5
'~xg~ 543
2340,216
2354.416
2344,690
3929.000
3879.0~0
3T79 ·
947 R~79
3T 29.
3679.
~.,,
35 ~ 9.00 0
051.
9~0 7~76
34~9. 000
3379.
969.26~
970.4°55
3279 0~n
976.0215
901 .9P2~
31 79. OOJ
1003.0!1
31 29
996 ~0
3~7~.0~
101~.3~1
3~9
105t ,423
297g .000
0.3000000
2929.000
-36.21 266
-~! .63975
S.0! 5190
5 792~01
767:~
5.0~'~9¢~
-22. 377;'3
5.7047~3
-49.18062
5. 408552
-1!.95151
4.11 675S
5.373675
-! ~ ~7372
'z x511Sx
-2.7.1~g2~
~ 58775 ;~
-3~ 3~ '*09
3.719S7~
-Sa 7¢~A35
-30.95790
3.38880~
~.~3575~
-4~ .~V6~7
-62.53~N7
5. t 6 '9 ~ 6 ~
-38. '796 b c
O.lOOOO00
-~0 0'~
.. . uUOO
56.02 o74
4.67219(
SiI . 94626
6.872910
6! .70404
5. 2091 52
59.$3754
5.524579
65. ~7! 6z+
4. 5976~ ¢
~4.~742
4. 6671 74
52
3.5767~9
~.1165~
5. 756055
67. 27361
2.~521~t
54. 6004 0
58.58629
~ .76Z06C
~3.1963~
Z.60Og86
65. 3648~
2.587920
2 4=1 457
2.502252
25.37o28
50.21385
52 ~1 ~1 2
2 ~o~ 277
~4 16~6
O. OOO00JO
1 2.84.'524
4.104422
13.1595~
6. 864'7O4
!3.30570
~.~7182'~
13.7450~
5.632919
14.~9620
4.767595
1 3. 64833
4.171757
!5.52576
2.649487
13. ~].770B
3.969750
14.~6943
3.1,.302;57
t3.99320
2.767337
13.~9434
~ x? ;)015
1 5 · 28~51
2.2572~3
1 8 · 24595
I .937821
17.2785~
2.32 !336'6
20.4~024
1 .ot~036
2n 22475
2.164319
20,96443
5. 1309 5'39
17.32965
7.022235
I 7. 34732
2.471641
12.04584
C. 2000000
10.30000
0.2000,330
2351.1~0
2314.Zg,S
2317.705
331
2256.311
2263.093
21,S8.8~2
2199.564
2172.280
2151.744
2134.777
g117.775
2073.466
2089. ?74
2066
. ,,
2056.722
2980.S59
1 no,'",
10CO. 0i30
ST~RT!NG T~E DEPTH
FILE TR~!LER ****
_ _
= 71 ~c,. 0a ~ NOI N'"
DEPTH =
292. 9. O0
Fl' E ~ 2
REPT
***:* FiLr'': HEADER ****
1024
ONE DEPTH PER =q,~ME
T:~PE CEOTH UNiT : FT
(TYPE¢ O) 191C 5YTES *
DEPTd SP G~
CMT ~FOC RILM R!L3
71!9,0C0
0 000"' ~
· uO,., C
7060. 009
840.9!0~
- ¢.n OOaO0
0.2000300
0.00 C 30 O 0
O.?O00OO0
1 .675505
10.90000
0.2000000
12.35¢3~
1.5~9554
7010 O.FO -6 7711'::0 119 05t'~ 12 AOaO~
840 5654 '~ 19'~1 ~ 61~7~4 ~ 5'~5SCl
-~ · I ~1 6:~7
2,4230i30
3. ~'5~767
6960.000
$47.11q?
~ 9 1 0. OOO
91.29320
I 6'~, ~ 07'''
:~I
P.
6860.0C0
86~, 7~I ~
12.417'4~
I · 527395
12.76075
...,
.,:. 871 ~41
12'6r1667
2 149~'~P
7;2.34t ,50
'.' '4¢8~54
,:' · . . ~
.:, .385 ~! 3
6760.000
· ~ I
1 2.5020.;
$. !, $ ,=,'-, ¢
,,
T,-~,
·
1 ~:]a Or'~
,,,, L, m
3320.441
506
3302.54C
554
~- ~'~' 2~a~. 55 A065' 12 ~7~'r' ~25 ~ 541
! 0, OuE --~' .......... ' .......
':~7.74~ 5 ,~1 2272 a, ~1 2768 3.7621 54
'~ gO0
6O,O~n -~000000 $~ ~3267 lZ 1506~ 1
TOT,~L D,~TA ~ECORnS. .~,, :
ST.&RTZN' TAPc.. ~ C-¢-PTH,~ =
FTLE TRAiL=R
7!1~ O0
ENE~ ? N6
T~PE
DEPTH :
652~ .00
LiS
39/01/09
01
TmAILER ****
TOTAL RECORD(. ~ IN T~iS,, LOGiC&L TAPE
LiS
3'~/0110~
ATLAS
01
TOTAL RECORDS ZN THIS
TOT.&L RECORDS IN THiS
End o~ execution: Tus 5
Elapsed e~ecution time
SYSTEM RETURN CODE = 0
= I
LOGi~'~L~. REEL. :
PHYSICAL REEL;
SE P ~9
m±nute ,
7:A7o
29.0
seconds.