HomeMy WebLinkAbout201-200MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Wednesday, July 23, 2025
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Bob Noble
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
Hilcorp North Slope, LLC
E-103
PRUDHOE BAY UN MDS E-103
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 07/23/2025
E-103
50-029-23045-00-00
201-200-0
W
SPT
7886
2012000 1972
1685 1686 1685 1685
19 163 171 179
4YRTST P
Bob Noble
5/17/2025
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:PRUDHOE BAY UN MDS E-103
Inspection Date:
Tubing
OA
Packer Depth
51 2256 2221 2215IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitRCN250518164130
BBL Pumped:3.2 BBL Returned:2.9
Wednesday, July 23, 2025 Page 1 of 1
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim DATE: Thursday, June 3, 2021
Regg
P.I. Supervisor q brlt(2dZ1 SUBJECT: Mechanical Integrity Tests
d Hilcorp NoNi Slope, LLC
E-103
FROM: Bob Noble PRUDHOE BAY UN MDS E-103
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I. Supry JW—
NON-CONFIDENTIAL Comm
Well Name PRUDHOE BAY UN MDSE -103 API Well Number 50-029-23045-00-00 Inspector Name: Bob Noble
Permit Number: 201-200-0 Inspection Date: 5/28/2021
Insp Num: mitRCN210531101047
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well E -l03 Type Inj w TVD sse 'Tubing 9n - Iv90 . zoo 19e2
PTD – 2012000 Type Test sPT"Test psi 1972 IA asa zess - zer/ - zao9 -
�_
BBL Pumped: 2s BBL Returned: zs OA tae a13 ao3 aoo
_
InterVaf 4YRTST P/F P
Notes: rZ4te �' w 19
Wei S nce 51 Z va
Thursday, June 3, 2021 Page I of I
Wallace, Chris D (CED)
From: Alaska NS - PB - Field Well Integrity <PBFieldWelllntegrity@hilcorp.com>
Sent: Saturday, May 22, 2021 3:14 PM
To: Wallace, Chris D (CED)
Cc: Regg, James B (CED); Stan Golis; Oliver Sternicki; Aras Worthington
Subject: OPERABLE: Injector E-103 (PTD #2012000) Ready for injection
Mr. Wallace,
Injector E-103 (PTD #2012000) is now operationally ready to be placed on water injection. The well is now classified as
OPERABLE and an AOGCC MIT -IA will be completed when the well is thermally stable.
Please call with any questions or concerns.
Ryan Holt
Hilcorp Alaska LLC
Field Well Integrity / Compliance
Ryan.Holt@Hilcorp.com
P:(907)659-5102
M: (907) 232-1005
From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com>
Sent: Wednesday, May 29, 2019 4:13 PM
To: 'ch ris.waIlace @alaska.gov' <chris.waIlace @alaska.gov>; AK, OPS EOC Specialists <AKOPSEOCSpecia lists@ bp.com>;
Ak, OPS GC1 Facility PTL <AkOPSGC1FacilityPTL@bp.com>; Ak, OPS GC1 Field PTL <AkOPSGC1FieldPTL@bp.com>; AK,
OPS GC1 OSM <AKOPSGCIOSM@bp:com>; AK, OPS GC1 Wellpad Lead <AKOPSGC1WeI[pad Lead@bp.com>; AK, OPS PCC
Ops Lead <AKOPSPCCOpsLead@bp.com>; AK, OPS Prod Controllers <akopsprodcontrollersl@bp.com>; AK, OPS Well
Pad DG <AKOPSWellPadDG@bp.com>; AK, OPS Well Pad EKG <AKOPSWeliPadEKG@bp.com>; AK, OPS Well Pad YP
<AKOPSWeI]PadYP@bp.com>; Ak, Ops West Area TL <AkOpsWestAreaTL@bp.com>; AK, RES GPB East Wells Opt Engr
<AKRESGPBEastWellsOptEngr@bp.com>; AK, RES GPB West Wells Opt Engr <AKRESGPBWestWellsOpt2@bp.com>;
AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>; Derrick, Laurie R < Laurie. Derrick@bp.com>; Haffener, Jordan
<Jordan.Haffener@bp.com>; Nottingham, Derek <Derek.Nottingham@bp.com>; Oshiro, Joleen
<JOLEEN.OSHIRO@bp.com>; Stone, Christopher <Christopher.Stone@bp.com>; Youngmun, Alex <younak@BP.com>
Cc: 'Regg, James B (DOA) (jim.regg@3laska.gov)' <jim.regg@alaska.gov>; AK, GWO Completions Well Integrity
<AKDCWLCompletionsSupt@bp.com>; AK, GWO DHD Well Integrity<AKD&CDHDWelllntegri@bp.com>; AK, GWO
Projects Well Integrity<AKDCProjectsWelllntegrityEngineer@bp.com>; AK, GWO SUPT Well Integrity
<AKDCWelllntegrityCoordinator@bp.com>; AK, GWO Well Integrity Well Information <akgwowellintegritywe@bp.com>;
AK, OPS FF Well Ops Comp Rep <AKOPSFFWellOpsCompRep@bp.com>; AKIMS App User <akimsuser.service@bp.com>;
Cismoski, Doug A <CismosDA@BP.com>; Daniel, Ryan <Ryan.Daniel@bp.com>; Dempsey, David G
<David.Dempseyl@bp.com>; Hibbert, Michael <Michael.Hibbert@BP.com>; Janowski, Carrie
<Carrie.Janowski@bp.com>; Montgomery, Travis <Travis.Montgomery@bp.com>; Obrigewitch, Beau
<BEAU.OBRIGEWITCH@bp.com>; O'connor, Katherine <Katherine.O'connor@bp.com>; Sternicki, Oliver R
<Oliver.Sternicki@bp.com>; Tempel, Joshua <Joshua.Tempel@bp.com>; Worthington, Aras J
<Aras. Worthington@bp.com>
Subject: NOT OPERABLE: Injector E-103 (PTD #2012000) will lapse on its AOGCC MIT -IA
All,
Wallace, Chris D (CED)
From:
AK, GWO Well Integrity Engineer <AKGWOWeliSiteEnginee@bp.com>
Sent:
Wednesday, May 29, 2019 4:13 PM
To:
Wallace, Chris D (CED); AK, OPS EOC Specialists; Ak, OPS GC1 Facility PTL; Ak, OPS GC1
Field PTL; AK, OPS GC1 OSM; AK, OPS GC7 Wellpad Lead; AK, OPS PCC Ops Lead; AK,
OPS Prod Controllers, AK, OPS Well Pad DG; AK, OPS Well Pad EKG; AK, OPS Well Pad
YP; Ak, Ops West Area TL; AK, RES GPB East Wells Opt Engr; AK, RES GPB West Wells
Opt Engr, AKOpsProdEOCTL,' Derrick, Laurie R, Haffener, Jordan; Nottingham, Derek,
Oshiro, Joleen; Stone, Christopher; Youngmun, Alex
Cc:
Regg, James B (CED); AK, GWO Completions Well Integrity, AK, GWO DHD Well
Integrity; AK, GWO Projects Well Integrity; AK, GWO SUPT Well Integrity, AK, GWO Well
Integrity Well Information; AK, OPS FF Well Ops Comp Rep; AKIMS App User; Cismoski,
Doug A; Daniel, Ryan; Dempsey, David G; Hibbert, Michael; Janowski, Carrie;
Montgomery, Travis J; Obrigewitch, Beau; O'connor, Katherine; Sternicki, Oliver R;
Tempel, Joshua; Worthington, Aras J
Subject:
NOT OPERABLE: Injector E-103 (PTD #2012000) will lapse on its AOGCC MIT -IA
Injector E-103 (PTD #2012000) is due for its AOGCC witnessed 4 -year MIT -IA by the end of the month. The well is
currently shut-in and will not be online before it lapses on the required MIT. It is now classified as NOT OPERABLE for
tracking purposes. An AOGCC witnessed MIT -IA will be scheduled when the well is ready for Injection.
Please respond with any questions.
Andrew Ogg
Well Integrity Engineer
BP Global Wells Organization -Alaska
Office: 907-659-8110
• •
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Wednesday, June 22, 2011
TO: Jim Regg e Z :3//
P.I. Supervisor ( SUBJECT: Mechanical Integrity Tests
BP EXPLORATION (ALASKA) INC
E -103
FROM: Bob Noble PRUDHOE BAY UN MDS E -103
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I. Supry 15
NON - CONFIDENTIAL Comm
Well Name: PRUDHOE BAY UN MDS E - 103 API Well Number: 50 Inspector Name: Bob Noble
Insp Num: mitRCN110621161043 Permit Number: 201 - 200 - Inspection Date: 6/20/2011
Rel Insp Num:
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well E -103 - Type Inj. 1 W , TVD 7886 IA 250 2500 2480 2470
P.T.D 2012000 • TypeTest 1 SPT Test psi 2500 ' OA 260 490 490 490
Interval 4YRTST p/F p ' Tubing I 1630 1640 1640 1640
Notes: A(A, Iet(cA .(csl+' lg71 p5;
F
'S , SUN 2:4- I All
!
Wednesday, June 22, 2011 Page 1 of 1
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
Ren
Monday,June 01,2015
f`
TO: Jim Regg en GI iS'ts
P.I.Supervisor SUBJECT: Mechanical Integrity Tests
BP EXPLORATION(ALASKA)INC
E-103
FROM: Johnnie Hill PRUDHOE BAY UN MDS E-103
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I.Supry —
NON-CONFIDENTIAL Comm
Well Name PRUDHOE BAY UN MDS E-103API Well Number 50-029-23045-00-00 Inspector Name: Johnnie Hill
Permit Number: 201-200-0 Inspection Date: 5/15/2015
Insp Num: mitJWH150516135640
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well] E-103 - Type Inj W TVD 7886 - j Tubing 1923 1925 1924- 1925 -
PTD 2012000 - Type Test SPT Test psi 1972 IA 211 ; 2718 - 2691 2686 •
Interval 4YRTST P/F P OA 169 456 , 448 448
Notes:
SL QED JUL
.L 31 J 1
Monday,June 01,2015 Page 1 of 1
.
MEMORANDUM
State of Alaska
.
Alaska Oil and Gas Conservation Commission
TO:
Jim Regg
P.I. Supervisor
Kí2(1' 11'7(07
DATE: Tuesday, July 03, 2007
SUBJECT: Mechanical Integrity Tests
BP EXPLORATION (ALASKA) INC
E-I03
PRUDHOE BAY UN MDS E-103
Src: Inspector
'J.,o\ ~ ~
FROM:
John Crisp
Petroleum Inspector
NON-CONFIDENTIAL
Reviewed By:
P.I. Suprv ,r-£e-
Comm
Well Name: PRUDHOE BAY UN MDS E-103 API Well Number: 50-029-23045-00-00 Inspector Name: John Crisp .~
Insp Num: mitJCr07070 1165437 Permit Number: 201-200-0 Inspection Date: 6/30/2007
Rei Insp Num:
Packer Depth // Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
I E-103 !Type Inj. ! w -7886 ,,/! IA- -~-~ I --~_.
Well TVD 680 i 2500 i 2470 I 2460 I
19715--toA _. .----
P.T.DI 2012000 !TypeTest I SPT Test psi 275 I 500 I 500 i 500 : I
~ I i , I .
/" _._-~- I .._-_._---------¡---~--
Interval 4YRTST P/F P Tubing 1950 1950 1950 I 1950 i .
i I I
Notes: 2.1 bbl's pumped for test No problems. /
sCANNED JUL 2 0 2007
Tuesday, July 03, 2007
Page 1 of 1
Seldlnbel'gel'
&o\-80Ü
06/21/06
t,-/·
, ,I......-"
L)·.:r
NO, 3862
,{" .. '''''.,.~¡ ì
"" ,"\'''';'',,-,''~'
'>!ì~}iJ 'Ç.. ,,-, "'--
"'¡
Company: Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
5chlumberger-DC5
2525 Gambell St, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Field:
Orion, Aurora,
Borealis, Polaris
Well
Job#
Log Description
Date
BL
Color
CD
5·111 11216189 MEMORY INJECTION PROFILE 04115/06 1
S-114A 10572082 R5T UPFLOW WFL 03101/03 1
V-105 10663005 INJECTION PROFILE 03/12/04 1
E·103 10560276 TEMPERATURE WARMBACK 06/22/03 1
V-214 11162720 UBI 11/24105 1
V·213 11076450 INJECTION PROFILE 07/01/05 1
V-216 11076451 INJECTION PROFILE 07/02/05 1
V-221 11058523 INJECTION PROFILE 07/03/05 1
L·103 N/A INJECTION PROFILE 07/18109 1
W·209 11076461 INJECTION PROFILE 08/20/05 1
W-207 10980589 INJECTION PROFILE 07/20/05 1
W·212 N/A INJECTION PROFILE 07/19/05 1
e
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
Date Delivered:
c"Pk
Schlumberger-DCS
2525 Gambel! St. Suite 400
Anchorage. AK 99503-2838
ATTN: Beth
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E Benson Blvd.
Anchorage AK 99508-4254
Received by:
e
RECEIVED
JUN 23 2006
';\J.ask.a C1I & Gas Cons. Commission
AnchOrage
Id-
e
e
.,. .,,-
~",..:,:~
······'":'···r······.·············"
,"-' ',' ..,
"', _'-t '. - ~
-;.,.;¡r¡¡;-
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFicl1e\CvrPgs _ Inserts\Microfilm _ Marlœr.doc
ALASKA OIL AND ~~ST~g~S~L::~ON COMMISSION R 1= CE IVED
REPORT OF SUNDRY WELL OPERATIONSorr 052004
2. Operator BP Exploration (Alaska), Inc.
Name:
3. Address: P.O. Box 196612
Anchorage, Ak 99519-6612
7. KB Elevation (ft):
1. Operations Performed:
Abandon 0
Alter Casing 0
Change Approved Program 0
63.68
8. Property Designation:
ADL-0028277
11. Present Well Condition Summary:
Total Depth
Repair Well 0 Pluq PerforationsD
Pull TubingO Perforate New Pool 0
Operation Shutdown 0 Perforate 0
lb. ..H3 Cons. Cqmmissio
Stimulate 0 OtherfX1' C. onvert to nJeclor i
~í1cnorage
WaiverD Time ExtensionO
Re-enter Suspended Well 0
5. Permit to Drill Number:
201-2000
6. API Number
50-029-23045-00-00
4. Current Well Class:
Development ŒJ
Exploratory 0
Service 0
StratigraphicD
9. Well Name and Number:
E-103
10. Field/Pool(s):
Prudhoe Bay Field / Midnight Sun Oil Pool
measured 12240 feet
Size
20" 91.5# H-40
5-1/2" 15.5# L-80
4-1/2" 12.6# L-80
3-1/2" 9.3# L-80
7-5/8" 29.7# L-80
10-3/4" 45.5# L-80
Plugs (measured) None
Junk (measured) None
MD TVD Burst Collapse
35 - 115 35.0 - 115.0 1490 470
10110 - 10131 7907.7 - 7919.7 7000 4990
10131 - 11654 7919.7 - 8127.1 8430 7500
10643 - 10663 8121.7 - 8122.9 10160 10530
31 - 10271 31.0 - 7992.7 6890 4790
34 - 4491 34.0 - 3784.0 5210 2480
Effective Depth
true vertical 8101.3 feet
measured 11677 feet
true vertical 8128.1 feet
Casing
Conductor
Liner
Liner
Liner
Production
Surface
Perforation depth:
Measured depth: 10729 -11653
True vertical depth: 8125.07 - 8127.03
Length
80
21
1523
20
10240
4457
Tubing ( size, grade, and measured depth):
5-1/2" 17# L-80
4-1/2" 12.6# L-80
@ 29
@ 4690
4690
10115
Packers & SSSV (type & measured depth):
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
Representative Daily Average Production or Injection Data
Gas-Mef Water-Bbl Casing Pressure
39.1 2
0 -5150
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Garry Catron
Printed Name Garry Catron
Jjh~ C~
Form 10-404 Re~ANNED OCT 0 9 2004
13
Prior to well operation:
Subsequent to operation:
14. Attachments:
Copies of Logs and Surveys run-
Daily Report of Well Operations. !
Signature
4-1/2" Baker S-3 Perm Packer
4-1/2" DWP Patch Packer
4-1/2" DWP Patch Packer
4-1/2" External Casing Packer
5-1/2" Baker ZXP Hydro Set Packer
@
@
@
@
@
10069
10643
10656
10662
10110
Oil-Bbl
648
0
Tubing Pressure
989
2100
15. Well Class after proposed work:
ExploratoryD
16. Well Status after proposed work:
OilD GasD
DevelopmentD
SeNiceŒ]
WAG D GINJD WINJŒ) WDSPL[
Prepared by Garry Catron (907) 564-4657
\Sundry Number or N/A if C.O. Exempt:
303-136
Title
Production Technical Assistant
Phone 564-4657
URIGINAL
Date
9/28/04
BfL
OCT 0 ö tUU\
E-103
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
06/13/03 First day of produced water injection
FLUIDS PUMPED
BBLS
No Fluids Pumped
0
ITOTAL
:)CANNED OCT 0 9 2004
Page 1
TREE = 5-1/8" FMC
WELLHEA D = FMC
ACTÙÃ. TOR-;----~"'~'h"'hh"NÃh'
~~^""""'~"~^~",,"~~~~-~,,~................~
KB. ELEV = 63.7'
"--~~--~--~._~~^~~"","""
BF. ELEV = 33.85'
~~~~~-"",^,,'-~~~--^~~~"~.~.~
KOP = 900'
'Mix" An gie ;';"""'''gs'' @ mf~h 1:f
D3.tuïï1"Mj = ..,... "'1 "ó57~:F
hÚuïTì'fVo';' "'''''sÚ5b'''ss.'
E-103
SAFETY NOTES: WELL ANGLE> 70° @ 10485'
& > 90° @ 10770'. DWP PATCH SET @
10643' (20' LONG- SEE DIAGRAM ON FILE).
CHROM E TUBING.
=-i 995' H1o-3/4" TAM PORT COLLAR 1
-
-
I
2174' H 5-1/2" HES X NIP, ID = 4.562" 1
110-3/4" CSG, 45.5#, L-80, 10 = 9.950" H 4491' ~
5-1/2"TBG,17#,13-CR-80,.0232bpf,ID=4.892" H 4730' 1
~
4731' H5-1/2" X 4-1/2" TBG XO, 10 = 3.958" 1
Minimum ID = 2.375" @ 10643'
4-1/2" DWP PATCH (20' LONG)
L
ST MD ND
4 4775 3919
3 71 96 571 9
2 9254 7242
1 9949 7745
GAS LIFT MANDRELS
DEV TY Æ VL V LA TOi PORT
44 KBG-2 DMY BK
44 KBG-2 DMY BK
42 KBG-2 DMY BK
49 KBG-2 DMY BK
OA. 1£
OS/21/03
05121/03
11/27/01
11/27/01
14-1/2"TBG, 12.6#, 13-CR-80, .0152 bpt, ID =3.958" H 10072' 1 Z
~
1 10051' H4-1/2"HffiXNIP, ID=3.813" I
1 10072' H7-5/8" x 4-112" BKRS-3 PKR, D = 3.875" 1
1 10105' H4-1/2" Hffi X NIP, ID = 3.813" 1
ITOPOFBKR C-21lEBAO< SLV, ID =5.750" H
4-1/2"TBG, 12.6#, 13-CR-80, .0152 bpf, D =3.958" H
17 -5/8" X 5-112" BKR ZXP PKR, ID = 4.982" H
17-5/8" X 5-1/2" BKR HMC HGR, ID = 4.982" H
10110' 1
1 0116' ~
1 011 T 1
10123' 1
~
t 10118'
1 10129'
1 10252'
H4-1/2"WLEG, ID= 3.958" 1
H 5-1/2" X 4-112" XO, 10 = 3.970" 1
H4-1/2" PLP JTW/RA TAG (20') 1
17-518" CSG, 29.7#, L-80, 10 =6.875" H 10270' ~
PERF ORA 1l0N SLJv1MA. RY
REF LOG: SÆRRY-SLN MND ON 11/17/01
ANGLE AT TOP PERF: 88 @ 10729'
I'bte: Refer to A-oduetbn DB for historical perf data
SIZE SPF INTERV AL Opn/Sqz DA 1£
4-1/2" SLTD 10729- 11655 0 11/27/01
10508' H4-1/2" PLPJTW/RA TAG (20') I
10643' H4-1/2" DWP PATOi, JD =2.375" X 20' LOf\G I
,~ 10662' HSKRB::PPAYZONEPKR.ID=3.930" I
~ 10729' HTOP OF 4-1/2" SL TD LNR, I
('" IID= 3.958"
, '
14-1/2" LNR,12.6#, L-80, .0152 bpf, ID = 3.958" H 10729' , "
, ,
, ,
" '
BTMOF 4-1/2" SLTDLNR H 11653' L',
14-112" SL TO LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" H 11655'
13-1/2" ABANDONtvENTSlRlf\G H 11894' 1
16-3/4" OÆN HOLE TO H 12240' I
1 11677' H FBTO I
11679' HBKRECP I
DATE
11/27/01
12/28101
02/20/02
04108103
OS/21/03
07111/03
COMtvENTS
ORIGINAL COMPLETION
CH/TP NEW WELL
SRBltlh DWP PA TCH
DRSlTP TVD/MJ CORRECTIONS
JCMffLP GLV C/O
CMOffLP KB ELEVATION / MAX ANGLE
8P Exploration (Alaska)
REV BY
DATE REV BY COMMENTS
09/17/03 CMO/TLP OA.1UM MD & ÆRF Af\GLE
MDNIGHf SlJ\J lJ\J1T
WELL: E-103
ÆRMT I'b: 2012000
API f\b: 50-029-23045-00
SEC 6, T11 N, R14E 1586' SNL & 501'WEL
&CANNED OCT 0 9 2004
Permit to Drill
2012000
MD
~b""""'"
~ Il).I.{t;¡ TVD
~ 0 D9-v
DATA SUBMITTAL COMPLIANCE REPORT
11/25/2003
fp~J Å 1tJ6ú ~J
API No. 50-029-23045-00-00
Well Name/No. PRUDHOE BAY UN MDS E-103
Operator BP EXPLORATION (ALASKA) INC
8101
Completion Date 11/27/2001
UIC N
/' Completion Status
1-01L
Current Status 1-01L
REQUIRED INFORMATION
Mud Log No
Directional Survey
No
Samples No
~- ~-- - --- ~- ~
DATA INFORMATION
~--
Types Electric or Other Logs Run:
Well Log Information:
Log/
Data
Type
t.rED
!
Electr
Digital Dataset
MedlFrmt Number
C -4-1570
L-(ED ~
~D
í
! Rpt
VoD
¡
~569
10963
10964
¡Log
i
~D
í
i Log
!
i Rpt
I
~ C
D
vt0666
10921
! Log
~
(data taken from Logs Portion of Master Well Data Maint)
~-
Name
Log Log Run
Scale Media No
1
Interval OH 1
Start Stop CH Received Comments
---------~- --- --- -
114 11342 Case 1/31/2003 Digital Well Logging Data
PB1
25
BS
1 114 12240 Case 1/31/2003 Digital Well Logging Data
1 70 12183 Open 7/10/2002
1 70 11286 Open 7/10/2002 PB1
1 70 11286 Open 7/10/2002 PB1
1 10150 11650 Case 4/19/2002
1 10068 11654 Case 4/1/2002
1 10150 11650 Case 4/19/2002
1 70 12183 Open 7/10/2002
1 10150 11650 Case 4/19/2002 ~".
1 10150 11650 Case 4/19/2002
1 10000 10643 Case 2/28/2003 Static BHP / T Survey
--~~-- - -~-- ~_u
25
BS
25
5
BS
Blu
Well Cores/Samples Information:
Name
ADDITIONAL INFORMATION
Well Cored? Y /~
Chips Received? Y ¡ f4 .
Analysis
Received?
Y IlL--
Interval
Start Stop
Sample
Set
Number Comments
Sent
Received
Daily History Received?
~N
&N
Formation Tops
Permit to Drill 2012000
DATA SUBMITTAL COMPLIANCE REPORT
11/25/2003
Operator BP EXPLORATION (ALASKA) INC
API No. 50-029-23045-00-00
Well Name/No. PRUDHOE BAY UN MDS E-103
MD
1240
TVD 8101
-- -- -. -
Comments:
~"" ç:"'1}~,\ ~ ft'l"-... t ß, v
1'1. c. /IIC- /1" MM ~U.. ~ ~ 11. t...
Completion Date 11/27/2001
1-01L
UIC N
Current Status 1-01 L
Completion Status
---- -----_.~
--
Compliance Reviewed By: IJ..-o
~---- ~ --
Date: 1(:) ~ ~)---
"""""-.
:(
MEMORANDUM
f
State of AI as ka
Alaska Oil and Gas Conservation Commission
TO: Randy RUedriCh'- ') ) DATE: June 24, 2003
Commissioner t 7 ¿ [)~
./""". . \ (\~l<~') SOBJECT: Mechanical Integrity Tests
THRU: Jim Regg \u?iiL( 1\ BPX
P.I. Supervisor .¡ S & E pad
S-112 & E-103
FROM: Lou Grimaldi Prudhoe Bay Unit
Petroleum Inspector Prudhoe Bay Field
NON. CONFIDENTIAL
Packer Depth Pretest Initial 15 Min. 30 Min.
Well 8-112 Type Inj. 8 T.V.D. 6551 Tubing 2000 2000 2000 2000 Interval I
P.TD. 2021350 Type test P Test psi 1638 Casing 200 1815 1795 1780 P/F P
Notes: Initial test after production flowback. Observed pretest conditions for thirty minutes.
Well E-103 Type Inj. F TV.D. 7885 Tubing 750 750 750 750 Interval I
P.TD. 2012000 Type test P Test psi 1971 Casing 1000 2120 2110 2105 P/F P
Notes: Initial test after workover
../
./
Type INJ. Fluid Codes
F = FRESH WATER INJ.
G = GAS INJ.
S = SALT WATER INJ.
N = NOT INJECTING
Type Test
M= Annulus Monitoring
P= Standard Pressure Test
R= Internal Radioactive Tracer Survey
A= Temperature Anomaly Survey
D= Differential Temperature Test
Interval
1= Initial Test
4= Four Year Cycle
V= Required by Variance
W= Test during Workover
0= Other (describe in notes)
Test's Details
I met Teresa Paterson and Troy 8now (BPX DHD) on 8 pad and witnssed the initial MIT on 8-112. The test went very
well with a negligable loss of pressure (35 psi non-linear).
We moved to E-I03 and after rigging up, perfonned an MIT on this recent conversion after Workover. This test also
went well with a 15 psi decline. Both wells were properly prepped and teresa provided the needed infonnation to make
these wells easy to perfonn the tests.
M.I.T.'s performed: Two
Attachments: None
Number of Failures: None
MIT report form
5/12/00 loG.
2003-0624_MIT _PBU_E-103_lg.xls
7/9/2003
(
'II'
\
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Mechanical Integrity Test
/ Email to: Tom_Maunder@admin.state.ak.us; Bob_Fleckenstein@admin.state.ak.us; Jim_Regg@admin.state.ak.us
r~. OPERATOR: BP Ex~loration (Alaska) Inc.
FIELD J UNIT J PAD: Prudhoe Bay I PBU I E
DATE: 06/24103
OPERATOR REP: Anna Dubel Teresa Patterson
AOGCC REP: Lou Grimaldi
Packer Depths (ft.) Pretest Initial 15 Min. 30 Min.
Well E-103 Type Inj. S MD/ìVD 10,072' 7,885' Tubing 740 750 750 750 Interva I
P.T.D. 2012000 Type test P Test psi 1971 Casing 1000 2120 2110 2105 P/F P
Notes: Post Inj. MITIA
Well Type Inj. MD/ìVD Tubing Interva
P.T.D. Type test Test psi Casing P/F
Notes:
Well Type Inj. MD/ìVD Tubing Interva
P.T.D. TvDe tes Test psi Casing P/F
Notes:
Well Type Inj. MD/ìVD Tubing Interva
P.T.D. Type tes Test psi Casino P/F
Notes:
Well Type Inj. MD/ìVD Tubing Interva
P.T.D. Tv De tes Test psi Casing P/F
Notes:
/
Test Details:
TYPE INJ Codes
F = Fresh Water Inj
G = Gas Inj
S = Salt Water Inj
N = Not Injecting
TYPE TEST Codes
M = Annulus Monitoring
P = Standard Pressure Test
R = Internal Radioactive Tracer Survey
A = Temperature Anomaly Survey
D = Differential Temperature Tes.t
INTERVAL Codes
I = Initial Test
4 = Four Year Cycle
V = Required by Variance
T = Test during Workover
a = Other (describe in notes)
MIT Report Form
Revised: 06/19/02
2003-0624_MIT _PBU_E-103.xls
~
(
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Mechanical Integrity Test.
Email to: Winton_Aubert@admin.state.ak.us; Bob_Fleckenstein@admin.state.ak.us; Jim_Regg@admin.state.ak.us
~PERATOR: BP Exploration (Alaska) Inc. ;
\ ,~J FIELD I UNIT I PAD: Prudhoe Bay I MID / E k( J,fJ
<R\ U DATE: OS/27 /03 '1~
OPERATOR REP: Mel Iveson
AOGCC REP:
¿!¿3( D3
Packer Depths (ft.) Pretest Initial 15 Min. 30 Min.
Well E-103 Type Inj. S MDI1VD 10,072' 7,885' Tubing 2150 2150 2150 2150 Interva I
P.T.D. 2012000 Tvpe test P Test psi 1971 CasinQ 0 3500 3440 3430 P/F P
Notes: Pre-Injection MITIA. AOGCC witnessed MITIA to follow once well is POI.
Well Type Inj. MD/ìVD Tubing Interva
P.T.D. Type test Test psi Casing P/F
Notes:
Well Type Inj. MD/ìVD Tubing Interva
P.T.D. Tvpetes Test psi Casing P/F
Notes:
Well Type Inj. MD/ìVD Tubing Interva
P.T.D. Tvpetes Test psi Casing P/F
Notes:
Well Type Inj. MD/ìVD Tubing Interva
P.T.D. Tvpetes Test psi CasinQ P/F
Notes:
Test Details:
TYPE INJ Codes
F = Fresh Water Inj
G = Gas Inj
S = Salt Water Inj
N = Not Injecting
TYPE TEST Codes
M = Annulus Monitoring
P = Standard Pressure Test
. R = Internal Radioactive Tracer Survey
A = Temperature Anomaly Survey
D = Differential Temperature Test
INTERVAL Codes
I = Initial Test
4 = Four Year Cycle
V = Required by Variance
T = Test during Workover
a = Other (describe in notes)
MIT Report Form
Revised: 06/19/02
MIT MID E-103 05-27-031.xls
E-I03 (PTD #2012000) Pre-injection MITIA
('
{
Subject: E-I03 (PTD #2012000) Pre-injection MITIA
Date: Wed, 28 May 2003 13:52:06 -0500
From: "NSU, ADW Well Integrity Engineer" <NSUADWWellIntegrityEngineer@BP.com>
To: "AOGCC Bob Fleckenstein (E-mail)" <Bob_Fleckenstein@admin.state.ak.us>
CC: "AOGCC Jim Regg (E-mail)" <Jim_Regg@admin.state.ak.us>, .jgß-
"AOGCC Winton Aubert (E-mail)" <Winton_Aubert@admin.state.ak.us>
Hi Bob,
Please see the attached pre-injection MITIA for E-103 (PTD #2012000). An
AOGCC witnessed MITIA will be conducted once the well in put on injection.
If you have any questions, please let me know.
Thanks,
John Cubbon
GPB Well Integrity Coordinator
1-907-659-5102
pgr. 659-5100, x. 1154
«MIT MID E-103 05-27-03.xls»
"."'"
."" "".'.'.""", "",' " "
"""""""",,,"'"
Name: MIT MID E-I03 05-27-03.xls
OMIT MID E-I03 05-27-03.xls Type: Microsoft Excel Worksheet (application/vnd.ms-excel)
, Encoding: base64
1 of 1
6/18/2003 9:34 AM
h
{
(
('
ilJ4A- 5/ 'I I ¿t"'o :5
tJ t7S QSIO'7/03
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
1. Type of request:
CONVERSION /
to H2O INJECTION
2. Name of Operator
BP Exploration (Alaska, Inc.
3. Address
P. O. Box 196612
Anchora e, AK 99519-6612
4. Location of well at surface
Abandon- Suspend-
Alter casing - Repair well -
Change approved program -
1586'FNL,5011 FEL, Sec. 06, T11N,R14E,UM
At top of productive interval
2000' FNL, 3939' FEL, SEC 31, T12N, R14E, UM
At effective depth
8941 FNL, 4729' FEL, Sec. 31, T12N, R14E, UM
At total depth
423' FNL, 2081 FEL, Sec 36 T12N, R13E, UM
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Conductor 104'
Surface 4462'
Production 1 0241'
Liner 1526'
Size
2011
10-3/411
7-5/811
4-1/211
Operational shutdown -
Plugging -
Pull tubing -
5. Type of Well:
Development _X
Exploratory -
Stratigraphic -
Service
(asp's 664480, 5975478)
(aspls 660918, 5980267)
(asp's 660100, 5981355)
(aspls 659746,5981819)
12240 feet
8101 feet
11655 feet
8127 feet
Plugs (measured)
Junk (measured)
Re-enter suspended well -
Time extension - Stimulate - CONVERT - H2O INJ
Variance - Perforate - Other _X
6. Datum elevation (DF or KB feet)
RKB 64.9 feet
7. Unit or Property name
Prudhoe Ba Unit
8. Well number
E-103 /'
9. Permit number / approval number
201-200 /'
10. API number
50-029-23045-00 ,/
11. Field / Pool
Prudhoe Ba Field I Midni ht Sun Pool
Measured Depth
1331
449f
True vertical Depth
1331
3784'
Cemented
260 sx AS (Approx)
930 sx AS Lite, 342 sx
'Gl 50S t...t 61/
3jñ sx Class lGI
3P sx Class lG'
~ 3 VJ6Æ-
102701 7992'
10129' -116551 79181 - 812T
RE CE IVED
measured Slotted LinerB 11655' MAY 05 2003
true vertical Slotted Liner 8125'- 8127' Ala8kaQj & Gas Cons. Commiteton
Anmomge
5-1/211 TBG to 47311; 5-1/211 X 4-1/211 TBG XO @ 4731 '; 4-1/211 TBG to 101181
Perforation depth:
Tubing {size, grade, and measured depth
Packers & SSSV (type & measured depth) 7-5/811 x 4-1/211 BKR S-3 PKR @ 100721 MD. 7-5/811 x 5-1/211 BKR ZXP PKR @ 101171 MD.
7-5/811 x 5-1/211 BKR HMC HGR @ 10123' MD. 5-1/211 x 4-1/211 XO @ 10129' MD.
Two BKR ECPs @ 10662' & 11679'. 5-1/211 HES 'X' Ni Ie @ 2174'.
13. Attachments Des ptjon summary of proposal _X Detailed operations program - BOP sketch -
14. Estimated date for co en ing operation 15. Status of well classification as:
MA , 2003
16. If proposal was verball proved
Name of approver Date approved Service WATER INJECTOR
17. I hereby certify that theÃ7g is true and correct to the best of my knowledge.
Signed ~ -n. 1t1I-~ Title: Midnight Sun Production Engineer
Alex Vance í
FOR COMMISSION USE ONLY
Conditions of approval: Notify Commission so representative may witness
Plug integrity - ê9P Test - Location clearance - LJ. 0 L I
.~ . tMeChanicallntegrity Test.z:. Subsequent form required 10-. -r ..
~Vt ) -ev w rv~ Ð-A-l;t. M.. r: r tl ÌICÅ-~t' '6 w.~ ~ l "', J ~D t,(..,Ä, ~ J .
Approved by order of the Commission Commissioner
M
Oil-
MOMS BF l
Form 10-403 Rev 06/15/88 .
Gas-
Suspended -
Questions? Call Alex Yancey @ 564-5092.
101- 1 r!Jl t¡
Date May 02. 2003
Pre ared b DeWa ne R. Schnorr 564.5174
Approval no'3o-S- )3/0
Date éJ S
ORIGINAL
SUBMIT IN TRIPLICATE
\.
\
(
bp
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage. Alaska 99519-6612
(907) 561-5111
May 2, 2003
Winton Aubert
Alaska Oil & Gas Conservation Commission
333 W. ih Avenue Suite 100
Anchorage, AK 99501
Re: Sundry Notice for E-103 Conversion from Producer to Inlector in Midnight Sun Oil
Pool. Prudhoe Bay Field
Dear Winton:
Attached is a Sundry Application for BP Exploration (Alaska), Inc. for well E-103. The
Sundry Application requests a classification change for well E-103 fronl a shut-in /"
producer to injector. The well will be used for water injection only. The 7-5/8" casing
will have a Mechanical Integrity Test prior to and during injection. Control and proper
monitoring of PWI injection will be maintained. Details of proposed monitoring and
testing routines to assure isolation are attached.
If you have any questions, please contact me at 564-5092 or alex.yancey@bp.com.
Sincerely,
4j(~~
Alex Yancey
Prudhoe Bay Gravity Drainage Team
Production Engineer
(
("
"
.
DS E-103
Sundry Notice 10-403 Application
May 2, 2003
Discussion
Well E-103 is currently a shut-in producer in the Midnight Sun Oil Pool.
Injection into well E-1 03 is necessary to provide pressure support to E-1 02 and replace
voidage from the Midnight Sun Oil Pool. A waterflood in the Midnight Sun Reservoir is
expected increase recovery by 15 to 25 percent and is detailed in the area injection order
application.
The well will only inject water in the Kuparuk Formation.
Action Plan
1. Perform MIT prior to injection start up. /'
2. Hook-up and pressure test injection flowline with fail-safe automatic surface
safety valve.
3. Establish stabilized injection at approximately 2000 psig injection pressure.
4. After 15 days of sustained injection a Water Flow Log will be run to prove zonal/'
injection isolation.
5. State witnessed MIT - IA after well temperature / pressure stabilized and every 4 /"
years to verify integrity thereafter.
6. Record wellhead pressures and rates daily and check annulus pressures weekly to
ensure there is no leakage.
7. Notify AOGCC on next business day if the monitoring in step 5 indicates any
problem.
I'
ij:
{
MECRANI CAL INTEGRITY REPORT' "-
~?UD DA-:::: IlJ¡/Ot-
:.~G RE~~;'_::~: 0)1/27/01
,
~"'ELL NUMEER
((.)
t..¡o~
OPER Ex FIELD
7 ~LL D ^ T '
,~ ,.,. 1:"... _:'.
TD: I 2 '}. Vo Jill.. ~ 10 / TVD; ? B TD :
Ii It? 'ZS HI? ~/ 2. '1 TVD
C ê. sir; g: "7 ~ '::.:/ E I ¡, S hoe: ¡ ()"'l 7 0 1{0 ~1 q i L TVD i D V :
.-..--, 111)
. Tv!)
::.ole Size
. J/" n
4" L Shoe: 11&5~ H:D
" '¡( /f,,11t. to
5 _I It P acke:r- 10 JI ,~~~ ill)
anå q :7/"'6 't
81 ¿ 7 TVD; :OP: I t.,? 12/( HD
'1 q I f ~"'¡D
:....:"':ìe~:
- . .
_~D~~g:
TVlJ it .....~ e t ê. i: I D 0 '11-
c:JoweJ
~:; 10lIC¡ to 1I1P5S
'5J II
t.Þ - 11../
.',
::-:EC?.ÞJ-1IC;'.L INTEGR TTY - ? ART i 1
¡ 15 mill
V~ O¡l" f~)
; 30 mill
I 1"""~
,.~~ e.t:::" '}...4 ,¿."~...._.
Annulus Press Test:
~p
C omm.e~ t s: t1 r: T' V",t?ti £(A~ ~"J J
/
.'
:-ŒCHÞ_1\1ICþ.~ INTEGRITY - PART /2
C em en L Volumes:' .Amt - Liner J 3 ~ It; Cs g "50 K ~ Ii; DV
C;:ui: 701 to cover Der::s -7~' ç ~ ~.(. -~IO4~~, e1(æ~ç~
Theoretical Toe ~ 0 l Ct'.'l '
ç laded 'l{~\itl (~). t l? 1 "'LC1, t .
Cement Bond Log (Yes or No)
M
; In AOGCC File o'~-""'~'"
CBL ~valuation, =one aDove perfs
/JIlt--
I
,
i
, i
¡
\
j
¡
Production Log: Type ~ F'L~ Evaluation
W ¡:: L V"'fl tM ¡.£ d P 'd 0:<. f¡, ¡'tv; .e»þ ¡.^":
0 ~:' 'Ü ' , ,.
CONC~LUSIONS : ' ..':
l) Ill/IlL Jt,.l J -
. '
? ar; n: fiIIcJ::T r'~ W' v(,fJ
? ar t: :z: IN Fe v'*"~ ~J d
-* E.'" 10'-1(' ¡' ~ A-o'l'£ jlJi"i M.,,~J ~.f~ ;#\-1 l!.{~t-:t ~.,',
, ~1R.1ri t:1 ~ .9,., /M..f d . "tJM
"
~ll I ' I yv..,Ju.,t,".átf.4,~,.t ("t... (
)
,I
E-I03 Sundry
Subject: E-IO3 Sundry
Date: Thu, 8 May 2003 14:17:26 -0500
From: "Yancey, Alex Nil <Alex.Yancey@BP.com>
To: "Winton Aubert (E-mail)" <winton- aubert@admin.state.akus>
(
(
Winton,
'"2.0 ( -108
Measuring toe-to-toe E-104 (also a water injector into Kuparuk) is -2130' away from E-103, but the wellbore comes much closer. This
is the only well that comes within the 1/4 mile radius. E-04A is the closest Ivishak well and is about 4200' away (map view, not 3D so
absolute distance is actually greater).
Please let me know if you need any information about E-104 or any other wells.
Thank you,
Alex Yancey
Pr'oduction Engineer'
Prudhoe Bay. Gravity Drainage
BP Exploration (Alaska) Inc.
alex.yancey@bp.com
(907) 564-5092
02/19/03
Schlumberger
Well
Job#
Log Description
NO. 2676
Company: Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Borealis
Midnight Sun
Date BL Sepia Color CD
Alaska Data and Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
V-113 ~f""I""\ -~J/,.. SBHP SURVEY 02104103 1
E-103 ~.....,- ~^^ SBHP SURVEY 01126103 1
a"'" W".....""
.~
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
Date Delivered:
Schlumberger DCS
3940 Arctic Blvd Suite 300
Anchorage AK 99503-5789
ATTN: Beth
--=:. .
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E Benson Blvd.
Anchorage AK 99508-4254
RECEIVED
fEB 28 2003
Alaaka Oii & Gas Cons. Comrniseion
Anchmge
,Æ
(
It
WELL LOG TRANSMl'lul'AL
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
To:
Janua¡y 24, 2003
aOl ~{;).[)ù
~115'10
RE:
MWD Fonnation Evaluation Logs: E-I03 PB 1 MIDNIGHT SUN, AK-MM-11180
E-tO3 PDt MIDNIGHT SUN:
Digital Log Images:
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Speny-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
Date:
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Signed: ~ ~
RECEIVED
JAN 3 1 2003
Ala8fra OH & Gas Con. Co '.
Anch~ mmiS8lOn
(
(
~O/-dOO
II 5to 9
WELL LOG TRANSMrl-l'AL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
January 24, 2003
RE:
MWD Formation Evaluation Logs: E-103 l\1IDNIGHT SUN,
AK-MM-11180
E-IO3 MIDNIGHT SUN:
Digital Log Images:
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Si~ ~ (h~
Date:
RECEIVED
JAN 3 1 2003
.Alaska Oii & Gas Cons. CommiS8km
Anchorage
"
,f
,
(
WELL LOG TRANSMITI AL
To:
State of Alaska
Alaska Oil and Gas ConselVation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
J\nchorage,Alaska
RE:
MWD Formation Evaluation Logs
E-I03 PBl,
AK-MM-11180
July 03, 2002
~O/-- dr)"O
IOO¡ø~
1 LDWG formatted Disc with verification listing.
API#: 50-029-23045-70
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Jim Galvin
6900 Arctic Blvd.
J\nchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Signed: d~ ~
Date:
RECEIVED
f II ~. 0 1')002
'-' 'v ~ ; 'L.
Alaska Oil & Gas Cons. Cornmiasfon
Anchorage
~
{
aO/-dOO
/ 09 10 3
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Corom.
Attn. : Lisa Weepie
333 West 7ili Avenue, Suite 100
~chorage,Alaska
July 03, 2002
RE:
MWD Formation Evaluation Logs
E-103,
AK-MM-11180
1 LDWG formatted Disc with verification listing.
API#: 50-029-23045-00
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Jim Galvin
6900 Arctic Blvd.
~chorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Signed:~(A. ~ )
Date:
RECEIVED
JUL 1 0 2002
Alaska Oil & Gas Cons. Commission
Anchorage
Scbl8bel'gBI'
Alaska Data and Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
~~
Well
Job#
Log Description
4/15/2002
NO. 1985
Company: Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field:
Midnight Sun
Date
CD
BL
Sepia
E-103 aD/-~f\a 22163 MCNL-BORAX 03/15/02 1 1 1
"-~#"""'
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E Benson Blvd.
Anchorage AK 99508-4254
RECEIVED
Date Delivered:
LPP 1 9 2002
. .. ., I
On
Anchorage
Schlumberger DCS
3940 Arctic Blvd Suite 300
Anchorage AK 99503-5789
ATTN: Sherrie
ReceiV~
( ,
Well LOG
TRANSMITTAL
(
ProActive Diagnostic Services, Inc.
To:
State of Alaska AOGCC
333 W. th Street
Suite # 700
Anchorage, Alaska 99501
RE:
Distribution - Final Print(s)
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed
copy of this transmittal letter to the attention of :
Joey Burton I Jeni Thompson
ProActive Diagnostic Services, Inc.
P. O. Box 1369
Stafford, TX 77497
BP Exploration (Alaska), Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, AK 99508
..._-._._~. .
-----~.
LOG DIGITAL MYLAR I BLUE REPORT
WELL DATE TYPE OR SEPIA LINE OR
CD-ROM FILM PRINT( S) COLOR
Open Hole 1 1 1
..--- -----
E-103 3/15/02 Res. Eva!. CH 1 1 1
. -- -----
dOl-aDO
Mech. CH 1
--- --
Caliper Survey
- --.
Signed:
~~
Date:
-0
Print Name:
t- c/) n 1 ') nO?
¡-\~ t \ L , l-.. -
Alaska Oil & Gas Cons. Commission
Anchorage
ProActive Diagnostic Services, Inc.,
310 K Street Suite 200, Anchorage, AK 99501
Phone:(907) 245-8951 Fax:(907) 245-8952
E-mail: pdsanchorage@memorylog.com
Web site: .w..w.:w...,.!JJ.~.IJJ.Qryl9,g&Q.m
(, STATE OF ALASKA (
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well
IBI Oil 0 Gas 0 Suspended 0 Abandoned 0 Service
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
~ '}. Location of well at surface ~,-". . , . "".
~ ",\~~NSL, 5011 WEL, SEC. 06, T11N, R14E, UM ,C-" - . .\ :
:~i~,P NO~tr~~~~i~~~,e;:L 31, T12N, R14E, UM: j.L.~-I~'7.??-L ':
At total depth : ~; ~ ':, '.' '
4855' NSL, 208' WEL, SEC. 36, T12N, R13E, UM .-.,ð--'
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No.
KBE = 63.68' ADL 028277
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband.
11/2/2001 11/20/2001 11/27/2001
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
12240 8101 FT 11677 8128 FT IBI Yes 0 No
22. Type Electric or Other Logs Run
MWD, GR, Gyro, 4-Phase RES, PWD,
23.
CASING
SIZE
2011
10-3/411
7-5/811
4-1/211
Classification of Service Well
.-"..
¡ :~IA ,x.~"!'
~"'" .,,:
-;'I
,;.,:; ~ ,,"'...,... ';' :
7. Permit Number
201-200
8. API Number
50- 029-23045-00
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
E-103
11. Field and Pool
Prudhoe Bay Field / Midnight Sun
15. Water depth, if offshore 16. No. of Completions
N/A MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
(Nipple) 2174' MD 1900' (Approx.)
WT. PER FT.
91.5#
45.5#
29.7#
12.6#
GRADE
H-40
L-80
L-80
L-80
NEU, DEN, Memory CCL, CNL
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH HOLE
Top BOTTOM SIZE CEMENTING RECORD
Surface 1101 3011 1260 sx Arctic SetlApprox}
35' 4491' 13-1 /211 ~66 sx Arctic Set Lite, 343 sx 'G'
31' 10271' 9-7/811 ß08sxClass'GI
101101 11655' 6-3/411 83 sx Class 'G'
AMOUNT PUllED
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
4-1/211 Slotted Liner
MD TVD
10729' - 11653' 8125' - 8127'
25.
MD
TVD
TUBING RECORD
SIZE DEPTH SET (MD)
5-1/211, 17#, 13Cr80 4731'
4-1/211, 12.6#, 13Cr80 4731' - 101181
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect with 95 Bbls of Diesel
PACKER SET (MD)
1 0072'
27.
Date First Production
February 19, 2002
Date of Test Hours Tested
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
Flowing
PRODUCTION FOR OIL-Bel
TEST PERIOD
GAs-McF
WATER-BBl
CHOKE SIZE
GAS-Oil RATIO
Flow Tubing Casing Pressure CALCULATED
Press. 24-HoUR RATE
28. CORE DATA (i';;"~;"""-;' {i"'\'. '(¡"" ~':~. t',,:""';,
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core cij¡p\.L;,<')~/' I:"".". ¡\i \~f' ¡~, ì~",i"
OIL-Bel
GAs-McF
WATER-BBl
Oil GRAVITY-API (CORR)
No core samples were taken.
'.. " .", ') ¡'"\ "") J'
:_,j ~ I:".,:. ,i ¡ 1\ , /
I'" ' "-" ,-.'-'U'I-
'.~\I.:¡d.,;)
... .h,.<iJlM;",
I"~ ,°, ~ ('on~~,r' í",c'¡""r'
1.,"1:).;3 \.,lmS.v "~"~~"~";"I'\~l:t
",,"
....'
Form 10-407 Rev. 07-01-80
RBDMS 8Ft
MAR 2 6 2002
Submit In Duplicate
~F
('
29.
Geologic Markers
Measured True Vertical
Depth Depth
5677' 46551
75451 60281
8134' 64631
10126' 79171
10247' 79811
10264' 79891
11710' 81301
12219' 8103'
Marker Name
Ugnu
West Sak
Colville Mudstone
HRl
Kalubik
Kuparuk
Miluveach
Miluveach
31. List of Attachments:
Summary of Daily Drilling Reports, SuNeys
('
30.
Formation Tests
Include inteNal tested, pressure data, all fluids recovered
and gravity, GOR, and time of each phase.
¡,;c,.,'
\
"
'.,'
- '"
":;,' .~ :' ."" :~ '. '~, ')
,. '.
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Terrie Hubble ~ . Title Technical Assistant
E-103
Well Number
201-200
Permit No. / A roval No.
INSTRUCTIONS
Prepared By Name/Number:
Terrie Hubble, 564-4628
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
(
~
('
Well:
Field:
API:
Permit:
E-103
Prudhoe Bay Unit
50-029-23045-00
201-200
Rig Accept:
Rig Spud:
Rig Release:
Drilling.B!g:
11/01/01
11 /02/01
11/27/01
Doyon 14
-- ------._------------- - -------.... -- ---------U_------------..---______m______-----------._------------------------------------------------------------------------------------.----_._----------------_. -----------------------------------------.-------- -------------_.._----..-- -..
POST - RIG WORK
12/30/01
PUMP 215 BBLS OF KCL WATER @ 2.5 BPM DOWN THE TUBING FOR INJECTIVITY TEST.
01/19/02
IA FL @ 5333' (95 BBLS) ACID STIM PREP. TBG STILL FROZE.
01/27/02
DRIFT W/ DMY DWP PATCH.
01128/02
ATTEMPT TO RUN DUMMY DRIFT FOR DWP PATCH. UNABLE TO GET PAST 1406' SLM HARD HYDRATES.
RAN 5' X 311 DRIVE DOWN BAILER TO CONFIRM FULL. AFTER PUMPING 5 BBLS METH TUBING PSI
HOLDING @ 2500#.
02/15/02
RIH W/ 3.011 DJ NOZZLE. ENCOUNTER HYDRATES AT 1800'. PUMPING 60/40 METHANOL, JET THROUGH
DOWN TO 2300', BREAK THROUGH HYDRATES. RIH TO 10,750' CTMD. POOH. RIG UP TO RUN 3.80511
X19.58' DMY TBG PATCH. BHA OAL=28.36', STAB ON & PUMP KILL VOL 2% KCL & FREEZE PROTECT TBG
TO 2000'. RIH WITH DRIFT. SAT DOWN AT 10,684' CTMD. COULD NOT GET DEEPER. POOH. FP FLOWLINE
WITH 50 BBLS - 60/40 METHANOL. LAY DOWN DUMMY TBG. PATCH. HOLD RISK ASSESSMENT MEETING.
WAIT ON HIGH WINDS.
02/16/02
ON WEATHER HOLD 00:01 TO 1200. RIG UP DS REAL TIME CCL, BOT #10 SETTING TOOL & 3.78511 X 19.80'
DWP TBG PATCH. RIH TO 6669', BEGIN PUMPING DOWN COIL, NO RESPONSE FROM CCL. COULD NOT
GET CCL TO 'WAKE UP'. POOH TO CHECK TOOLS. REPLACED CCL WITH NEW TOOL. REPLACED
SETTI NG TOOL.
02/17/02
RIH WITH PATCH. SAT DOWN AT 10634' CTMD. COULD NOT GET DEEPER. LOGGED UP TO 9900' AT 60
FPM. LOG WAS INCONCLUSIVE WHEN COMPARED TO LINER TALLY. RBIH AND SAT DOWN AT SAME,
10634'. LOGGED AT 15 FPM AND INCREASED TO 20 FPM UP TO 9900'. LOG SHOWED SOME
CORRELATABLE COLLARS. RBIH FOR THIRD PASS. TAGGED SAME. LOGGED UP AT 20 FPM TO 9900'.
3RD PASS HAD SOME REPEAT TO THE 2ND PASS BUT NOTHING CONCLUSIVE, POOH. BREAK OUT
PATCH, (TOOLS PACKED WITH DRY CHUNKY ASPHALTENES & METAL SHAVINGS). RIH WITH MEMORY
CCL GAMMA TO 10750' - 9899' CTMD, POOH. LOG INDICATES THAT THE PATCH HAD REACHED A
CORRECTED DEPTH OF 10612'. RU TO JET WASH LINER. RIH WITH 3.0011 JS NOZZLE.
02/18/02
RIH W/ 311 JS NOZZLE. JET WASH LINER TO 10750' CTMD WITH 15% XYLENE/DIESEL. CHASE OUT OF
HOLE WITH CRUDE. FP FLOWLINE WITH 50 BBLS OF 60/40 METHANOL. RIH DS REAL TIME CCL, BOT #10
SETTING TOOL & 3.78511 X 19.80' DWP TBG PATCH. LOG AND TIE INTO SWS MEMORY CCUGR (2/17/02).
POSITION AND SET PATCH ACROSS CEMENTER (CEMENTER @ 10656-58' CORRECTED), TOP OF PATCH
@ 10,643', TOP ELEMENT @10647.5', BOTTOM ELEMENT @ 10663'. POOH. TOOLS INDICATED GOOD SET.
( ~
E-103, Post Drill & Complete WorK
Page 2
("
02119/02
MU 2.2511 JET SWIRL NOZZLE. RIH. JET WASH LINER FROM 10750' TO 11630' WITH 50 BBLS OF 15%
XYLENE/DIESEL. LAY IN 40 BBL'S 7.5% HCL FROM 11630 TO 9000' CTMD', LET SOAK FOR 30 MINUTES
WHILE RIH TO TD. JET REMAINING 30 BBL'S HCL ACROSS SLOTTED LNR, FOLLOWED WITH 2% KCL
PULLED ABOVE LAYED IN ACID, RUN IN HOLE PUMPING OVER FLUSH. INJECTION PRESSURE BUILDING
STEADILY, REACHED 1500 PSI AT.7 BPM WHEN NOZZLE REACHED TD (54 BBL'S KCL BEHIND PIPE). I
THOUGHT THE FORMATION WAS STARTING TO PLUG OFF AND CHOSE TO START OUT OF THE HOLE
BEFORE PUMPING ALL OF THE OVER FLUSH, ONLY PUMPING APPROXIMENTL Y 70 BBLS BEHIND PIPE
TOTAL. ALSO I DID NOT ESTABLISH AN INJECTION RATE. BULLHEADED AN ADDITIONAL 30 BBLS 2% KCL
TO DETERMINE A INJECTION RATE AS WELL AS GET MORE WATER BEHIND PIPE. INJECTION RATE 1300
@ 1.5 BPM. POP WELL AND REQUESTED WELL TEST AFTER 4 HOURS FLOWING. ACID TITRATION OF
7.5 % IRON < 22 PPM.
03/15/02
MIRU DS CTU#3. KNOCK WHP DOWN TO RI WI PDS MEMORY STP TOOLS. OPEN WELL TO FLOW: LOG
FLOWING PASSES FROM 10,100' - 11,630' @ 100 & 60 FPM. OBTAIN STOP COUNTS ABOVE AND BELOW
CASING PATCH. CONFIRM GOOD TEMP AND PRESSURE DATA. ---SPINNER DAMAGED SETTING IN
GLM(S). MAKE UP SWS MEMORY CNL TOOL. LOAD AND KILL WELL. LOG 2 CNL PASSES: 10,050' - 11,630'
PUMP 120 BBLS BORAX, LOG 2 CNL BORAX PASSES: 10,050' - 11,630'. PUMP DIESEL POOH, FP FL WI 50
BBLS 60/40 MW. POP OFF & RIG DOWN.
Legal Name:
Common Name:
I
Test
E-103
E-103
11/7/2001
11/15/2001
LOT
LOT
4,526.0 (ft)
(ft)
3,783.0 (ft)
(ft)
9.50 (ppg)
(ppg)
Surface Pressure
1,220 (psi)
(psi)
Leak Off Pressure (BHP)
3,087 (psi)
(psi)
Page 1 of 1
EMW
15.71 (ppg)
15.71 (ppg)
~~
/~~
Printed: 11/27/2001 4:14:50 PM
{
(
BP EXPLORATION Page 1 of 9
Operations Summary Report
Legal Well Name: E-1 03
Common Well Name: E-1 03 Spud Date: 10/31/2001
Event Name: DRILL +COMPLETE Start: 10/31/2001 End: 11/27/2001
Contractor Name: DOYON Rig Release: 11/27/2001
Rig Name: DOYON 14 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
11/1/2001 00:00 - 15:00 15.00 MOB P PRE PJSM. Cantilever derrick into transport position. Move off of E
102i. Move in rig & spot same on E 103. Shim rig, cantilever
derrick into position and connect lines. Spot cuttings tank.
ACCEPT rig at 1500 hrs Nov 01, 2001.
15:00 -19:00 4.00 RIGU P PRE NU diverter bag and diverter line. Take on spud mud.
19:00 - 22:00 3.00 RIGU P PRE Function test diverter bag and knife valve. PU HWDP and
stand back in derrick.
22:00 - 23:30 1.50 DRILL P SURF Slip and cut drilling line. Service top drive and rig.
23:30 - 00:00 0.50 DRILL P SURF PU BHA components from outside.
11/2/2001 00:00 - 00:30 0.50 DRILL P SURF Continue to PU BHA compontents from outside.
00:30 - 01 :00 0.50 DRILL P SURF MU bit to a stand of HWDP. Fill conductor pipe with mud and
check diverter and flow line for leaks.
01 :00 - 02:00 1.00 DRILL P SURF Drill out ice bridge in conductor pipe. Break bit and stand back
HWDP.
02:00 - 05:30 3.50 DRILL. P SURF MU BHA. Stand back drill collars. Adjust mud motor bend to
1.83 deg. Orient motor and MWD (DIR AND GR).
05:30 - 06:00 0.50 DRILL P SURF Drill from 110' to 184'. ART=0.5hrs.
06:00 - 08:30 2.50 DRILL P SURF Rig up slickline and run single shot gyro.
08:30 - 12:30 4.00 DRILL N RREP SURF Work on cuttings conveyors and mixing pumps.
12:30 -17:30 5.00 DRILL N FLUD SURF Clean mud pump screens. Flush out mixing hopper. Condition
Mud.
17:30 - 00:00 6.50 DRILL P SURF Drill from 184' to 515'. Run Sperry photo gyro on slickline due
to magnetic interference.
11/3/2001 00:00 - 00:00 24.00 DRILL P SURF Drill 13 1/2" hole from 515' to 2,120' as per directional plan.
11/4/2001 00:00 - 03:30 3.50 DRILL P SURF Drill from 2,120' to 2,504' building angle. ART=1.73,
AST=O. 71.
03:30 - 05:00 1.50 DRILL P SURF Pump low viscosity sweep and circulate bottoms up. Pump dry
job.
05:00 - 06:00 1.00 DRILL P SURF Flow check. Well static. POH to change bit and motor bend.
No hole problems on trip out.
06:00 - 08:30 2.50 DRILL P SURF LD UBHO sub. Change out MWD pulser, directional and
gamma probes. Adjust motor bend to 1.5 deg. Orient motor.
Shallow test motor and MWD.
08:30 - 09:30 1.00 DRILL P SURF RIH to 2,504'. No hole problems.
09:30 - 00:00 14.50 DRILL P SURF Drill from 2,504' to 4,035'. ART=6.47, AST=2.34'.
11/5/2001 00:00 - 05:00 5.00 DRILL P SURF Drill from 4,035' to 103/4" casing point in the SV3 at 4,506'.
ART=3.66, AST=O. 75.
05:00 - 06:30 1.50 DRILL P SURF Pump low viscosity sweep and circulate bottoms up. PU
casing tools to rig floor. Flow check. Well static.
06:30 - 09:30 3.00 DRILL P SURF POH. 50 K Ib over pull at 3,320', top of the SV5, and one at
2,130'. Wiped both without pump and pulled back through w/o
problems.
09:30 - 11 :00 1.50 DRILL P SURF LD BHA.
11:00 -12:30 1.50 CASE P SURF Clear rig floor. Make dummy run with casing hanger on landing
joint.
12:30 - 14:30 2.00 CASE P SURF Rig up to run 10 3/4" casing.
14:30 -17:30 3.00 CASE N MISC SURF Make up float equipment. One connection cross treaded.
Replaced float collar and 2 joints.
17:30 -18:30 1.00 CASE P SURF Make up float collar. Test floats. Floats held.
18:30 - 20:00 1.50 CASE N SFAL SURF Thaw ice plug from surface circulating system
20:00 - 00:00 4.00 CASE P SURF Run in hole with 103/4",45.5#, L-80, BTC casing to 2,490'.
Work pipe through tight spots from 2,117' to 2,490' without
pumps.
Printed: 11/27/2001 4: 14:27 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
11/6/2001
11/7/2001
11/8/2001
11/9/2001
,/
(
('
BP EXPLORATION
Operations Summary Report
E-103
E-103
DRILL +COMPLETE
DOYON
DOYON 14
00:00 - 02:30
From - To Hours Activity Code NPT
SURF
02:30 - 06:00
06:00 - 07:30
07:30 - 12:00
12:00 - 13:00
13:00 -14:00
14:00 -15:00
15:00 -17:30
17:30 -18:00
18:00 - 21 :00
21 :00 - 22:00
22:00 - 00:00
00:00 - 03:00
03:00 - 03:30
03:30 - 04:30
04:30 - 08:00
08:00 - 10:00
10:00 -13:30
13:30 -14:00
14:00 - 15:00
15:00 - 16:30
16:30 - 17:30
17:30 - 00:00
00:00 - 12:00
12:00 - 12:30
12:30 -17:00
17:00 -17:30
17:30 - 20:00
20:00 - 21 :00
21:00 - 21:30
21 :30 - 00:00
00:00 - 01 :30
Phase
2.50 CASE
P
3.50 CASE
P
SURF
1.50 CASE
P
SURF
4.50 CASE
P
SURF
1.00 CASE
P
SURF
1.00 CASE
1.00 CASE
2.50 CASE
0.50 CASE
3.00 CASE
1.00 CASE
2.00 CASE
P
P
P
P
P
P
P
SURF
SURF
SURF
SURF
SURF
SURF
SURF
3.00 BOPSUF P
0.50 BOPSUF P
1.00 BOPSUF P
3.50 DRILL P
SURF
SURF
SURF
INT1
2.00 DRILL
3.50 DRILL
P
P
INT1
INT1
0.50 DRILL
1.00 DRILL
1.50 DRILL
1.00 DRILL
6.50 DRILL
12.00 DRILL
0.50 DRILL
P
P
P
P
P
P
P
INT1
INT1
INT1
INT1
INT1
INT1
INT1
4.50 DRILL
P
INT1
0.50 DRILL
P
INT1
2.50 DRILL
1.00 DRILL
0.50 DRILL
2.50 DRILL
P
P
P
P
INT1
INT1
INT1
INT1
1.50 DRILL
P
INT1
Page 2 of 9
Start: 10/31/2001
Rig Release: 11/27/2001
Rig Number:
Spud Date: 10/31/2001
End: 11/27/2001
Description of Operations
Continue to run 10 3/4", 45.5#, L-80, BTC casing to 4,491'. No
hole problems or tight spots.
MU landing joint and mandrel hanger. Break circulation. Land
casing. Stage up circulation rate and reciprocate casing.
Circulate 1.5 times annular volume. PU=265 K, SO=135 K.
LD Franks fill up tool and MU cement head. Circulate and
reciprocate casing.
Test cement lines to 3,500 psi. Pump 10 bbls CW-100, 75 bbls
10.2 ppg mud push spacer, ~91 bbls 10.7 ppg Arctic Set Lite
lead cement at 6 bpm, 71 bbl~ 15.8 class G tail cement at 5
bpm. Switch to rig pumps and displace cement at 7 bpm.
Bump plug on calculated strokes. Floats held. No losses
during cement job. 277 bbls of lead cement returned to
surface plus 46 bbls contaminated cement.
Back out cement head and landing joint. Flush out landing
joint and LD.
Clear rig floor.
Flush out stack with stack washer.
ND diverter.
Install tubing and casing spools and test to 1,000 psi.
NU BOP.
Rig up to test BOPE.
Test BOPE to 250 psi low, 3,500 psi as per BP policy and
AOGCC regulations. Witness of test waived by John Crisp of
AOGCC.
Continue testing BOPE.
Pull test plug and install wear bushing.
PU bails and elevators.
PU BHA, adjust motor to 1.15 deg. Orient. Load MWD. RIH
with HWDP. Flow test motor and MWD.
Slip and cut drilling line. Service top drive. Adjust kelly hose.
PU 5" drill pipe from pipe shed and RIH to the float collar at
4,404'.
Circulate bottoms up.
Pressure test casing to 3,500 psi for 30 minutes.
Drill float collar, cement, float shoe, and 20' of new formation.
Pull into casing and perform LOT. 15.7 ppg EMW.
Drill 97/8" hole to 5,4951.
Drill 9 7/8" hole from 5,595' to 6,736'. AST=1.36, ART=6.75.
CBU with sweep S-S. Got increase of cuttings seen with
sweep.
POH. Work first 5 stands off bottom with swabbing and
overpulls of 10-50k. Back ream and pump from 5,970' to casing
shoe at 4,491', as needed.
CBU. Lots of wall cake and cuttings coming over shakers while
circulating.
Continue to POH.
Stand back HWDP. Change bit.
Down load MWD.
LD MWD probes. LD hang off collar. PU SLD/ACL. Load
MWD. Load radio active sources. Adjust kelly hose.
Continue to load MWD / sources. RIH and flow test motor and
MWD.
Printed: 11/27/2001 4:14:27 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
11/9/2001
11/10/2001
11/11/2001
11/12/2001
11/13/2001
('
(
BP EXPLORATION
Operations Summary Report
E-103
E-103
DRILL +COMPLETE
DOYON
DOYON 14
01 :30 - 06:00
From - To Hours Activity Code NPT
INT1
06:00 - 07:00
07:00 - 00:00
00:00 - 06:30
06:30 - 07:30
07:30 - 10:30
10:30 - 12:00
12:00 - 12:30
12:30 - 14:00
14:00 - 14:30
14:30 - 00:00
00:00 - 07:30
07:30 - 09:00
09:00 - 13:30
13:30 - 14:30
14:30 -15:30
15:30 -16:30
16:30 - 17:30
17:30 - 18:30
18:30 - 19:30
19:30 - 20:30
20:30 - 22:30
22:30 - 23:00
23:00 - 00:00
00:00 - 10:30
10:30 - 12:00
12:00 - 12:30
12:30 - 14:30
14:30 - 15:00
15:00 - 21 :00
21 :00 - 22:30
22:30 - 23:30
23:30 - 00:00
00:00 - 01 :00
01 :00 - 01 :30
01 :30 - 02:00
02:00 - 02:30
02:30 - 03:30
03:30 - 04:00
04:00 - 05:00
4.50 DRILL
1.00 DRILL
17.00 DRILL
6.50 DRILL
1.00 DRILL
3.00 DRILL
1.50 DRILL
0.50 DRILL
1.50 DRILL
0.50 DRILL
9.50 DRILL
7.50 DRILL
1.50 DRILL
4.50 DRILL
1.00 DRILL
1.00 DRILL
1.00 DRILL
1.00 DRILL
1.00 DRILL
1.00 DRILL
1.00 DRILL
2.00 DRILL
0.50 DRILL
1.00 DRILL
10.50 DRILL
1.50 DRILL
0.50 DRILL
2.00 DRILL
0.50 DRILL
6.00 DRILL
1.50 DRILL
1.00 DRILL
0.50 DRILL
1.00 DRILL
0.50 DRILL
0.50 CASE
0.50 CASE
1.00 CASE
0.50 CASE
1.00 CASE
P
P
P
INT1
INT1
P
P
P
INT1
INT1
INT1
P
P
P
P
P
P
N
INT1
INT1
INT1
INT1
INT1
INT1
DFAL INT1
N
N
N
N
DFAL INT1
DFAL INT1
DFAL INT1
DFAL INT1
N
N
N
N
N
DFAL INT1
DFAL INT1
DFAL INT1
DFAL INT1
DFAL INT1
N
P
P
P
P
P
P
P
P
P
DFAL INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
P
P
P
P
P
P
INT1
INT1
INT1
INT1
INT1
INT1
P
INT1
P
INT1
Page 3 of 9
Start: 10/31/2001
Rig Release: 11/27/2001
Rig Number:
Spud Date: 10/31/2001
End: 11/27/2001
Phase
Description of Operations
PU 5" DP from pipe shed and RIH to 6,670'. No hole
problems.
Wash from 6,670' to 6,736'. Log from 6,700' to 6,736'.
Pump sweep. Establish clean hole ECD guide. Get slow pump
rates. ( Good show of cuttings on bottoms up.) Drill from
6,736' to 7,977'. AST=4.25, ART=7.20. Drill with 60 RPM
through hard stingers and increase RPM to 80. Pump high
viscosity weighted sweeps every 400'. Assembly is having a
building tendency, requiring lots of sliding to reduce angle.
Drilled from 7,977' to 8,582'.
Circulate hole clean. Flow check. Well static.
Short trip. POH to 7,150'. Tight spots at 7,900 and 7,420'.
Pump dry job. Continue POH to 4,466', inside to casing shoe.
Slip and cut drilling line.
Service top drive.
TIH to 8,486'. No hole problems.
Wash and ream last stand from 8,484' to 8,582'.
Drill from 8,582' to 9,5421.
Drill from 9,542' to 10,019'. ART=3.90 , AST=1.27.
MWD failure. Surge drill string and attempt to regain MWD
signal. Pump dry job. Flow check. Well static.
POH.
Stand back HWDP and 1 stand of drill collars.
Unload RA source. Down load from MWD tools.
Change out bit, MWD HOC, probes, and LWD, SLD, CNP,
ACAL.
Load RA source and upload to MWD.
RIH with HWDP and 1 stand of drill collars. Flow test MWD.
RIH to 103/4" casing shoe at 4,491'.
Circulate bottoms up while slipping and cutting drilling line.
Continue to RIH to 9,925'. Worked one tight spot at 7,230' and
hole conditions improved.
Breack circulation. Wash and ream from 9,925' to 10,019'.
Drill from 10,019' to 10,026'.
Drill from 10,026' to 10,281'. AST=3.32 ,ART=5.47
CBU. Flow check. Well static.
Short trip from 10,281' to 9,802'.
Pump sweep. Spot liner running pill on bottom.
Flow check. Well static. Pull 5 stands. Pump dry job.
POH and stand back 32 stands of 5" DP. LD remaining 5" DP.
LD HWDP and drill collars.
PJSM on RA sources. Remove RA sources and down load
MWD.
LD MWD, bit, and motor. Straighten motor.
LID DIRECTIONAL BHA
CLEAN AND CLEAR RIG FLOOR
PULL WEAR BUSHING
DUMMY RUN WITH LANDING JOINT AND HANGER
P/U AND RUN IN WITH TEST PLUG, CHANGE RAMS
TO 7 5/8"
PRESSURE TEST RAM BODY TO 3500 PSI FOR 10
MINUTES, OK
RIG UP TO RUN 7 5/8" CASING
Printed: 11/27/2001 4:14:27 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
11/13/2001
11/14/2001
11/15/2001
t
(,
BP EXPLORATION
Operations Summary Report
E-103
E-103
DRILL +COMPLETE
DOYON
DOYON 14
From - To Hours Activity Code NPT
05:00 - 10:00
10:00 - 11 :00
11 :00 - 19:00
19:00 - 20:30
20:30 - 21 :00
21 :00 - 22:00
22:00 - 23:00
23:00 - 00:00
00:00 - 02:00
02:00 - 03:00
03:00 - 04:00
04:00 - 06:30
06:30 - 07:30
07:30 - 14:00
14:00 - 14:30
14:30 - 17:30
17:30 - 18:00
18:00 - 18:30
18:30 - 20:30
20:30 - 21 :30
21 :30 - 23:30
23:30 - 00:00
00:00 - 02:00
02:00 - 06:00
06:00 - 07:00
07:00 - 10:00
10:00 - 12:00
12:00 - 13:00
13:00 - 14:30
5.00 CASE
1.00 CASE
P
P
INT1
INT1
8.00 CASE
p
INT1
1.50 CASE
P
INT1
0.50 CASE
P
INT1
1.00 CASE
P
INT1
1.00 CEMT
P
INT1
1.00 CEMT
P
INn
2.00 CEMT
P
INT1
1.00 BOPSUF P
INT1
1.00 BOPSUF P
2.50 DRILL P
INT1
INT1
1.00 BOPSUF P
6.50 BOPSUF P
INT1
INT1
0.50 DRILL
3.00 DRILL
0.50 DRILL
0.50 DRILL
2.00 DRILL
1.00 DRILL
2.00 DRILL
0.50 DRILL
2.00 DRILL
P
N
P
P
P
P
P
P
P
INT1
RREP INT1
INT1
INT1
INn
INT1
INT1
INT1
INT1
4.00 DRILL
P
INT1
1.00 DRILL
3.00 DRILL
P
P
INT1
INT1
2.00 DRILL
P
INT1
1.00 DRILL
P
INT1
1.50 DRILL
P
INn
Page 4 of 9
Start: 10/31/2001
Rig Release: 11/27/2001
Rig Number:
Spud Date: 10/31/2001
End: 11/27/2001
Phase
Description of Operations
PJSM, RUN CASING 29.7 #, BTC, L 80 TO 4449'
BREAK CIRCULATION AT 4449', CIRCULATE BOTTOMS
UP, 570 PSI @ 7.5 BPM
RUN CASING FROM 4,449' TO 10,270' SMALL LOSSES
NOTED WHILE RUNNING IN. SLOW SLACK OFF SPEED
SLIGHTLY.
CIRCULATE BOTTOMS UP, CONDITION MUD FOR
CEMENTING, STAGE PUMP UP FROM 30 SPM @ 890
PSI TO 90 SPM @ 1000 PSI. NO LOSSES WHILE
STAGING UP PUMPS.
PULL OUT SLIPS, LAND CASING, LD FRANKS
CIRCULATING TOOL, INSTALL CEMENT HEAD,
SUPERVISOR WITNESS LOADING OF CEMENT HEAD
PJSM WI CEMENTERS, CIRCULATE AND CONDITION
MUD FOR CEMENTING, 90 SPM @ 820 PSI
PRESSURE TEST LINES TO 3500 PSI, OK,
CEMENTERS DOWN FOR APP THEN 30 MINUTES DUE
TO MIXING EQUIPMENT FAILURE, CEMENT AS PER
PROGRAM,
DISPLACE WI RIG PUMPS AND 8 BPM 10.7 PPG MUD,
BUMP PLUG TO 1100 PSI, FLOATS DID NOT HOLD
UD CEMENT TOOLS, UD LANDING JT, CLEAR RIG
FLOOR
PIU RUNNING TOOL AND PACK-OFF, SET PACK-OFF,
RUN UP LOCK DOWN SCREWS, PRESSURE TEST TO
5000 PSI FOR 10 MINUTES, OK
CHANGE 75/8" PIPE RAMS TO 2 7/8" x 5" VARIABLES
CHANGE TOP DRIVE SAVER SUB, BACK UP CLAMP
AND JAWS, BELL GUIDE
RIG UP TO PRESSURE TEST BOPE
PRESSURE TEST BOPE AS PER AOGCC
REGULATIONS
RUN WEAR BUSHING
RIG REPAIR, REPLACE IBOP VALVE ON TOP DRIVE
PRESSURE TEST IBOP, OK
PIU, INSTALL BAILS AND ELEVATORS
PIU, MIU, 4" DRILLPIPE FROM PIPE SHED, 60 JTS
RACK 20 STANDS OF 4" DRILLPIPE INTO DERRICK
PIU, MIU DIRECTIONAL BHA
UPLOAD MWD
UPLOAD MWD, INSTALL NUCLEAR SOURCES, PIU,
MIU, BHA, SURFACE TEST MWD, CHANGE
ELEVATORS
PIU, MIU, 4" DRILLPIPE FROM PIPE SHED, FILL
EVERY 3000', 6002' STOP
SLIP AND CUT DRILLING LINE
PIU, MIU, 4" DRILLPIPE FROM PIPE SHED, WASH
DOWN LAST 2 STANDS, TAG CEMENT AT 10,164'
DISPLACE TO WATERED BACK MUD, 9.0 PPG, 1550 PSI
AT 5.5 BPM
PRESSURE TEST CASING TO 3500 PSI FOR 30
MINUTES, OK
DRILL CEMENT FROM 10,164', FC 10,188', FS 10,270',
Printed: 11/27/2001 4:14:27 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
11/15/2001
11/16/2001
11/17/2001
11/18/2001
~,
(
BP EXPLORATION
Operations Summary Report
E-103
E-103
DRILL +COMPLETE
DOYON
DOYON 14
From - To Hours Activity Code NPT
13:00 -14:30
14:30 - 15:30
15:30 - 16:30
16:30 - 17:30
17:30 - 00:00
00:00 - 12:00
12:00 - 00:00
00:00 - 06:30
06:30 - 07:15
07:15-11:30
11 :30 - 12:00
12:00 -13:00
13:00 -15:00
15:00 -18:00
18:00 -18:30
18:30 -19:00
19:00 - 20:30
20:30 - 21 :00
21 :00 - 23:00
23:00 - 00:00
00:00 - 03:30
03:30 - 07:30
07:30 - 11 :00
11 :00 - 12:00
12:00 - 15:00
15:00 - 17:30
17:30 - 18:30
1.50 DRILL
1.00 DRILL
1.00 DRILL
1.00 DRILL
6.50 DRILL
12.00 DRILL
12.00 DRILL
6.50 DRILL
0.75 DRILL
4.25 DRILL
0.50 DRILL
1.00 DRILL
2.00 DRILL
3.00 DRILL
0.50 DRILL
0.50 DRILL
1.50 DRILL
0.50 DRILL
2.00 DRILL
1.00 DRILL
3.50 DRILL
4.00 DRILL
3.50 DRILL
1.00 DRILL
3.00 DRILL
2.50 DRILL
1.00 DRILL
Phase
P
P
P
INT1
INT1
INT1
P
INT1
P
PROD1
P
PROD1
P
PROD1
P
PROD1
P
PROD1
P
P
P
P
P
PROD1
PROD1
PROD1
PROD1
PROD1
P
P'
P
PROD1
PROD1
PROD1
P
PROD1
P
P
PROD1
PROD1
P
P
PROD1
PROD2
P
PROD2
P
P
PROD2
PROD2
P
PROD2
P
PROD2
Page 5 of 9
Start: 10/31/2001
Rig Release: 11/27/2001
Rig Number:
Spud Date: 10/31/2001
End: 11/27/2001
Description of Operations
TO 10,281'
DIRECTIONAL DRILL FROM 10,281' TO 10,320'
CIRCULATE BOTTOMS UP, MUD WT 9.0 PPG IN AND
OUT
LOT, MUD WT 9.0 PPG, APPLIED PRESSURE 1900
PSI, LOT = 13.56 PPG
DIRECTIONAL DRILL FROM 10,320' TO 10,497' MD,
8,079' TVD
AST 2.88, ART 2.32, ADT 5.20 DRILLING WITH 72 SPM
@ 2,550 10-20 WOB
DIRECTIONAL DRILL 63/4" PILOT WELLBORE FROM
10,497' MD, 8,079' TVD TO 10,806' MD, 8,108' TVD
AST 2.54, ART 6.14, ADT 8.7
DIRECTIONAL DRILL 6 3/4" PILOT WELLBORE FROM
10,806' MD, 8,108' TVD TO 11,255' MD, 8,147' TVD
AST 1.91, ART 8.04, ADT 9.95
DIRECTIONAL DRILL 6 3/4" PILOT WELLBORE FROM
11,255 MD, 8,147' TVD, TO
11,342' MD, 8,143' TVD, TD FOR PILOT HOLE
AST 1.33, ART 4.34, ADT 5.67
CIRCULATE BOTTOMS UP, FLOW CHECK, PUMP DRY
JOB, 2470 PSI AT 7 BPM
TRIP OUT, FLOW CHECK AT 9933'
FLUSH BHA, STAND BACK JARS, DRILL COLLARS
PJSM, REMOVE NUCLEAR SOURCES
DOWNLOAD MWD, UD BHA, FUNCTION BLIND RAMS
CIO ELEVATORS, MIU MULE SHOE, TRIP IN TO
10,260'
BREAK CIRCULATION, 500 GPM AT 800 PSI
TRIP IN TO 11,272',
BREAK CIRCULATION, 670 PSI AT 250 GPM, PJSM WI
CEMENTERS, RECIPROCATE PIPE AND CIRCULATE
WHILE CEMENTERS BATCH CEMENT
CEMENT PLUG AS PER PROGRAM, FROM 11,272' TO
10,025'
TRIP OUT 14 STANDS SLOWLY
BREAK CIRCULATION AT 9938', 880 PSI AT 500 GPM,
DROP DRILL PIPE WIPER, CIRCULATION PRESSURE
NOW 2400 PSI AT 500 GPM, CIRCULATE BOTTOMS
UP, TRACE OF CEMENT, CIRCULATING PRESSURE
SAME AT 2400 PSI
TRIP OUT, UD MULE SHOE BHA
P/U, MIU BIT WI DIRECTIONAL BHA, PJSM, INSTALL
NUCLEAR SOURCES, UPLOAD MWD
TRIP IN, DRIFT STANDS, FILL PIPE AT 3125', 1020 PSI
AT 5 BPM
SLIP AND CUT DRILLING LINE
TRIP IN DRIFTING STANDS, BREAK CIRCULATION AT
9933', WASH DOWN, TAG CEMENT AT 10,061'
DRILL CEMENT FROM 10,061' TO 10.312', KICK OFF
POINT
DISPLACE WELL TO 8.7 LSND MUD, 50 BBL SPACER
TO DRILL-IN MUD, 2 % KCL. DISPLACE @ 330 GPM WI
Printed: 11/27/2001 4:14:27 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
11/18/2001
11/19/2001
11/20/2001
11/21/2001
(
"
t
BP EXPLORATION
Operations Summary Report
E-103
E-103
DRILL +COMPLETE
DOYON
DOYON 14
From - To Hours Activity Code NPT
17:30 - 18:30
18:30 -19:00
19:00 -19:30
19:30 - 21:00
21 :00 - 00:00
00:00 - 16:30
16:30 -17:00
17:00 -18:00
18:00 - 00:00
00:00 - 10:00
10:00 - 11 :30
11:30 -14:00
14:00 - 15:00
15:00 - 16:00
16:00 - 21 :00
21 :00 - 22:00
22:00 - 00:00
00:00 - 01 :30
01 :30 - 02:00
02:00 - 02:30
02:30 - 07:00
07:00 - 07:30
07:30 - 08:00
08:00 - 08:30
08:30 - 09:30
09:30 - 15:30
1.00 DRILL
0.50 DRILL
0.50 DRILL
1.50 DRILL
3.00 DRILL
16.50 DRILL
0.50 DRILL
1.00 DRILL
6.00 DRILL
10.00 DRILL
1.50 DRILL
2.50 DRILL
1.00 DRILL
1.00 DRILL
5.00 DRILL
1.00 DRILL
2.00 DRILL
1.50 DRILL
0.50 DRILL
0.50 DRILL
4.50 DRILL
0.50 DRILL
0.50 DRILL
0.50 CASE
1.00 CASE
6.00 CASE
Phase
P
P
PROD2
PROD2
P
PROD2
P
PROD2
P
PROD2
P
PROD2
P
P
PROD2
PROD2
P
PROD2
P
PROD2
P
PROD2
P
PROD2
P
PROD2
P
P
PROD2
PROD2
P
PROD2
P
PROD2
P
PROD2
P
P
P
PROD2
PROD2
PROD2
P
P
P
P
PROD2
PROD2
PROD2
PROD2
P
PROD2
Page 6 of 9
Start: 10/31/2001
Rig Release: 11/27/2001
Rig Number:
Spud Date: 10/31/2001
End: 11/27/2001
Description of Operations
45 RPM
CLEAN SHAKER TANK, SHAKERS, TROUGH, DITCHES
FOR NEW MUD
CIRCULATE, ESTABLISH PWD BASELINE, SLOW PUMP
RATES EACH PUMP, ORIENT, SURVEY
DIRECTIONAL DRILL, TIME DRILL OFF CEMENT PLUG
FROM 10,312' to 10,358'
DIRECTIONAL DRILL 63/4" PRODUCTION WELLBORE
FROM 10,358' TO 10,482'
8.80891 TVD, AST 3.10, ART 0.29, ADT 3.39
DIRECTIONAL DRILL 63/4" PRODUCTION WELLBORE
FROM 10,482' MD, 8,8089' TVD, TO 11,468' MD, 8,8091'
TVD
AST 3.80, ART 3.67, ADT 7.47
CIRCULATE, SURVEY, FLOW CHECK
WIPER TRIP FROM 11,468' TO 10,250' NO ADVERSE
HOLE CONDITIONS OR FILL.
DIRECTIONAL DRILL 6 3/4" PRODUCTION WELLBORE
FROM 11,468' MD, 8,8091' TVD TO 11,800' MD, 8,131'
TVD
AST 1.75, ART 5, ADT 6.75
DIRECTIONAL DRILL 6 3/4" PRODUCTION WELLBORE
FROM 11,800' TO
TD OF 12,240' MD, 8,101' TVD,
AST 0, ART 7.98, ADT 7.98
CIRCULATE BOTTOMS UP AND CIRCULATE SWEEP,
FLOW CHECK
TRIP OUT, FROM 12,240' TO 11,655' PUMP OUT,
WORK DRILL STRING
OUT OF MILUVEACH
CIRCULATE BOTTOMS UP, 7 BPM AT 2680 PSI, FLOW
CHECK
TRIP OUT TO 11,250', INSIDE CASING SHOE
FLOW CHECK, PUMP DRY JOB, PULL PIPE STILL
WET, PUMP DRY JOB, PIPE STILL WET, POOH, FLOW
CHECK AT BHA
CIO ELEVATORS, LID JARS, PBL SUB, FLEX DC,
RETRIEVE DRIFT
PJSM, REMOVE NUCLEAR SOURCES, DOWN LOAD
MWD
DOWNLOAD MWD, FLUSH TOOLS, LID MWD, MOTOR,
BIT
PULL WEAR BUSHING
RIU TO PRESSURE TEST BOPE
PRESSURE TEST BOPE AS PER AOGCC
REGULATIONS
RID PRESSURE TEST EQUIPMENT
RUN WEAR BUSHING
RIU TO RUN 31/2" TUBING
PJSM, PIU, MIU, 6 JTS TUBING, MIU FLOAT SHOE,
FLOAT COLLAR, ECP, P & A KIT, LID TUBING TOOLS
CHANGE ELEVATORS, RIH WI 4" DP, FILL EVERY 10
STDS, STOP AT 10,270'
Printed: 11/27/2001 4:14:27 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
11/21/2001
11/22/2001
11/23/2001
(
(
BP EXPLORATION
Operations Summary Report
E-103
E-103
DRILL +COMPLETE
DOYON
DOYON 14
15:30 -16:30
From - To Hours Activity Code NPT
PROD2
16:30-17:30
17:30 - 18:00
18:00 - 19:00
19:00 - 21 :00
21 :00 - 22:00
22:00 - 23:00
23:00 - 00:00
00:00 - 02:30
02:30 - 03:00
03:00 - 06:00
06:00 - 06:30
06:30 - 11 :30
11 :30 - 12:00
12:00 - 12:30
12:30 - 14:00
14:00 -15:00
15:00 -17:30
17:30 - 19:30
19:30 - 20:00
20:00 - 21 :30
21 :30 - 00:00
00:00 - 02:00
02:00 - 02:30
02:30 - 03:00
03:00 - 03:30
03:30 - 06:00
Phase
1.00 CASE
P
1.00 CASE
0.50 CASE
P
P
PROD2
PROD2
1.00 CASE
2.00 CASE
P
P
PROD2
PROD2
1.00 CASE
1.00 CASE
P
P
PROD2
PROD2
1.00 CASE
2.50 CASE
P
P
PROD2
PROD2
0.50 CASE
3.00 CASE
P
P
PROD2
PROD2
0.50 CASE
p
PROD2
5.00 CASE
P
PROD2
0.50 CASE
0.50 CASE
P
P
PROD2
PROD2
1.50 CASE
P
PROD2
1.00 CASE
P
PROD2
2.50 CASE
P
PROD2
2.00 CASE
N
CEMT PROD2
0.50 CASE
P
PROD2
1.50 CASE
P
PROD2
2.50 CASE P
2.00 CLEAN P
PROD2
COMP
0.50 CLEAN P
COMP
0.50 CLEAN P
0.50 CLEAN P
2.50 CLEAN P
COMP
COMP
COMP
Page 7 of 9
Start: 10/31/2001
Rig Release: 11/27/2001
Rig Number:
Spud Date: 10/31/2001
End: 11/27/2001
Description of Operations
CIRCULATE 1 DP VOLUME, 30 SPM AT 650 PSI, PIU,
MIU CEMENT HEAD
RIH TO 11,894', BREAK CIRCULATION
CIRCULATE, RECIPROCATE DRILLPIPE, PJSM WI
CEMENTERS, BATCH CEMENT
CEMENT AS PER PROGRAM, SHEAR AT 2700 PSI
CIRCULATE SWEEP, SPOT LINER PILL, 65 SPM AT
1400 PSI
FLOW CHECK, TRIP OUT TO 10,270'
RID CEMENT HEAD,' CIO ELEVATORS, PUMP DRY
JOB, FLOW CHECK
TRIP OUT TO 5,750'
TRIP OUT 4" DRILLPIPE AFTER RUNNING SACRIFICIAL
STRING
R/U TO RUN 41/2" LINER
PIU, MIU 41/2" LINER, SLOTTED, ECP, SOLID, ZXP,
LINER HANGER
RID LINER RUNNING TOOLS, PIU DRILLPIPE RUNNING
TOOLS
TRIP IN 4" DRILLPIPE WI LINER ASSEMBLY, FILL
EVERY 10 STANDS
MIU SINGLE WI XlO, CEMENT HEAD, LAY ON SKATE
10,2501, BREAK CIRCULATION, 3 BPM 580 PSI, CIRC
VOLUME OF DRILLPIPE
TRIP IN TO 11,655', PIU CEMENT HEAD, BREAK
CIRCULATION 4 BPM
DROP 1 ST PLUG, SET LINER HANGER, 1500 PSI,
SLACK OFF, 10,000 LBS, CONFIRM SET, INFLATE ECP,
1730 PSI, 0.3 BBL, SET ECP, 2300 PSI, OPEN ES
CEMENTER, 3100 PSI
CIRCULATE AT 4 BPM 920 PSI, PJSM, DOWELL
REPAIR EQUIPMENT, CEMENT AS PER PROGRAM,
DROP 2 ND PLUG, DID NOT LAND
CIRCULATE CEMENT TO SURFACE AT 5 BPM, AFTER
CEMENT TO SURFACE, AT 5252 STROKES PRESSURE
UP TO 2460 PSI, HELD 2 MINUTES, NO BLEED BACK
BREAK DOWN CEMENT HEAD, LID ON SKATE, P/U 1
STD FROM DERRICK, SET 40,000 LBS DOWN TO
CONFIRM LINER SET
RlU TO REVERSE CIRCULATE, PRESSURE UP TO
1140 PSI, BLEED OFF, RIU TO CIRCULATE DOWN
DRILLPIPE PRESSURE UP TO 600 PSI IN 3 STROKES,
BLEED DOWN, CHECK ALL SURFACE EQUIPMENT,
PROBLEM DOWN HOLE
TRIP OUT, WET
TRIP OUT WI 4" DRILLPIPE WI LINER RUNNING
TOOLS, WET
MAKE SERVICE BREAKS, BREAK OUT TAILPIPE WI
DART JAMMED INSIDE, LID RUNNING TOOLS
CLEAN RIG FLOOR, CHANGE HANDLING TOOLS
RIU TO RUN 2 7/8" DRILLPIPE
PJSM, PIU, MIU, TRIP IN, BIT, BHA, 2 7/8" DP, XlO,
SCRAPPER, XlO
Printed: 11/27/2001 4: 14:27 PM
(
(
BP EXPLORATION Page 8 of 9
Operations Summary Report
Legal Well Name: E-1 03
Common Well Name: E-103 Spud Date: 10/31/2001
Event Name: DRILL +COMPLETE Start: 10/31/2001 End: 11/27/2001
Contractor Name: DOYON Rig Release: 11/27/2001
Rig Name: DOYON 14 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
11/23/2001 06:00 - 06:30 0.50 CLEAN P COMP CHANGE OUT 27/811 RUNNING TOOLS FOR 411 TOOLS
06:30 - 09:00 2.50 CLEAN P COMP TRIP IN TO 7353'
09:00 - 10:00 1.00 CLEAN P COMP SLIP AND CUT DRILLING LINE
10:00 - 11 :00 1.00 CLEAN P COMP TRIP IN TO 10,109', BREAK CIRCULATION, RECORD
DRILLING PARAMETERS
11 :00 - 11 :30 0.50 CLEAN P COMP TRIP IN TO ES CEMENT TOOL AT 10,650'. MANUALLY
CLOSE CEMENTER VALVE
11 :30 - 12:30 1.00 CLEAN P COMP ROTARY DRILL ES CEMENT TOOL, 10,650' TO 10,652'
12:30 -13:30 1.00 CLEAN P COMP CLEAN OUT TO HALIBURTON LANDING COLLAR AT
10,687'
13:30 -14:30 1.00 CLEAN P COMP DROP BALL, CIRCULATE TO BOTTOM, OPEN PBL
SUB, CIRCULATE, ATTEMPT TO PRESSURE TEST
WELLBORE TO 1700 PSI, NO SUCCESS
14:30 - 16:00 1.50 CLEAN P COMP DISPLACE WELLBORE, PUMP 20 BBL HI-VIS SPACER
FOLLOWED BY NEW 8.5 PPG, 2 % KCL WATER, 600
BBLS
16:00 - 19:30 3.50 CLEAN N DFAL COMP TRIP OUT DRILLING BHA
19:30 - 20:00 0.50 CLEAN N DFAL COMP UD SCRAPPER, XIOs, CHANGE OUT HANDLING
TOOLS
20:00 - 21 :30 1.50 CLEAN N DFAL COMP TRIP OUT 2 7/811 DRILLPIPE
21 :30 - 22:00 0.50 CLEAN N DFAL COMP UD DRILLING BHA
22:00 - 22:30 0.50 CLEAN N DFAL COMP PJSM, MIU RTTS WI HALIBURTON SUPERVISOR
22:30 - 00:00 1.50 CLEAN N DFAL COMP TRIP IN WI RTTS TO 4100'
11/24/2001 00:00 - 02:30 2.50 CLEAN N DFAL COMP TRIP IN WI RTTS BHA
02:30 - 03:30 1.00 CLEAN N DFAL COMP SET RTTS AT 10,145', PRESSURE TEST DOWN
DRILLPIPE, EST FEED RATE .25 BBL @ 1700 PSI,
PRESSURE TEST ANNULUS TO 2000 PSI FOR 10
MINUTES, OK, UNSEAT RTTS
03:30 - 07:00 3.50 CLEAN N DFAL COMP TRIP OUT RTTS BHA
07:00 - 09:00 2.00 CLEAN N DFAL COMP UD RTTS, MIU DRILLING BHA, RUN 2 7811 DP, XIOs,
SCRAPPER
09:00 - 12:00 3.00 CLEAN N DFAL COMP TRIP IN WI DRILLING BHA TO 10,600'
12:00 - 14:00 2.00 CLEAN P COMP DRILL LANDING COLLAR AT 10,687' TO 10,6881, WASH
DOWN TO TAG FLOAT
COLLAR AT 10,727', WASH TO 10,751' LOCATED
FLOAT COLLAR, 24' DEEPER, DRILL FLOAT COLLAR
FROM 10,751' TO 10,753', WASH TO TOP OF GUIDE
SHOE AT 11,677', 24' DEEPER
14:00 - 16:30 2.50 CLEAN P COMP PJSM, DISPLACE WELLBORE TO 2 % KCL WATER, 8.4
PPG, SPM 2 x 30, PUMP PRESSURE 3300 PSI
16:30 - 00:00 7.50 CLEAN P COMP FLOW CHECK, TRIP OUT LAYING DOWN 411
DRILLPIPE, STRAP PIPE AS LAYED DOWN IN PIPE
SHED, DRILLSTRING STICKY WHILE TRIPPING OUT
11/25/2001 00:00 - 04:00 4.00 CLEAN P COMP UD DRILLPIPE, 411, 2 7/811, NOTICE DRILLPIPE
COVERED IN NON-HYDROCARBON BLACK
SUBSTANCE, FOUND JT OF 27/811 PIPE THAT A OVER
TORQUED BOX WAS FLARED OUT, COULD HAVE
CAUSED OVERPULL CATCHING ON CASING MAKE-UP
JOINTS
04:00 - 05:00 1.00 CLEAN P COMP SERVICE TOP DRIVE, MOBILIZE HALLIBURTON SLICK
LINE UNIT
05:00 - 06:00 1.00 CLEAN N FLUD COMP RIU SLICK LINE UNIT
06:00 - 12:00 6.00 CLEAN N FLUD COMP RUN GUAGE RING AND JUNK BASKET TO 10,080',
Printed: 11/27/2001 4:14:27 PM
l
,
t
BP EXPLORATION Page 9 of 9
Operations Summary Report
Legal Well Name: E-1 03
Common Well Name: E-103 Spud Date: 10/31/2001
Event Name: DRILL +COMPLETE Start: 10/31/2001 End: 11/27/2001
Contractor Name: DOYON Rig Release: 11/27/2001
Rig Name: DOYON 14 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
11/25/2001 06:00 - 12:00 6.00 CLEAN N FLUD COMP JUNK BASKET 3/4 FULL OF NON-HYDROCARBON
BLACK SUBSTANCE
12:00 - 12:30 0.50 CLEAN N FLUD COMP RID SLICK LINE UNIT
12:30 - 13:00 0.50 CLEAN P COMP UD 2 7/8" BHA
13:00 -13:30 0.50 CLEAN P COMP CLEAR AND CLEAN RIG FLOOR
13:30 -14:30 1.00 CLEAN P COMP RUN 4" DRILLPIPE FROM DERRICK
14:30 -15:30 1.00 CLEAN P COMP SLIP AND CUT DRILLING LINE. PU TUBING RUNNING
EQUIPMENT TO FLOOR.
15:30 -17:30 2.00 CLEAN P COMP UD 4" DRILLPIPE
17:30 -18:00 0.50 RUNCO~ /P COMP PULL WEAR BUSHING
18:00 -19:00 1.00 RUNCO~ /P COMP CHANGE TOP RAMS TO 41/2" x 7", BODY PRESSURE
TEST TO 1000 PSI FOR 10 MINUTES, OK
19:00 - 20:30 1.50 RUNCO~ /P COMP PIU, RlU, PRODUCTION TUBING HANDLING TOOLS
20:30 - 00:00 3.50 RUNCO~ /P COMP RUN PRODUCTION TUBING
11/26/2001 00:00 - 15:00 15.00 RUNCO~ /P COMP RUN COMPLETION TUBING AS PER PROGRAM
15:00 -16:00 1.00 RUNCO~ /P COMP SPACE OUT AS PER BAKER SUPERVISOR
16:00 -17:30 1.50 RUNCO~ /P COMP PUMP 219 BBLs OF INHIBITED KCL WATER DOWN
ANNULUS
17:30 -19:00 1.50 RUNCO~ P COMP LAND TUBING HANGER AND RILDS
19:00 - 20:30 1.50 RUNCO~ P COMP PRESSURE UP AND SET PACKER, TEST TUBING TO
3500 PSI FOR 30 MINUTES, OK, BLEED PRESSURE
ON TUBING TO 2000 PSI, PRESSURE UP ANNULUS
TO 3500 PSI FOR 30 MINUTES, OK, BLEED DOWN
PRESSURE TO SHEAR RP
20:30 - 21 :00 0.50 RUNCO~ P COMP INSTALL TWC, TEST FROM BELOW TO 1000 PSI FOR
10 MINUTES, OK
21 :00 - 22:30 1.50 RUNCO~ P COMP NIPPLE DOWN BOPE
22:30 - 23:30 1.00 RUNcor p COMP NIPPLE UP TREE
23:30 - 00:00 0.50 RUNcor p COMP PRESSURE TEST ADAPTER FLANGE AND TREE TO
250 PSI AND 5000 PSI FOR 15 MINUTES, OK,
11/27/2001 00:00 - 01 :30 1.50 RUNcor p COMP RU HOT OIL, TEST LINES. DSM PULL TWC WI
LUBRICATOR
01 :30 - 05:00 3.50 RUNcor p COMP FREEZE PROTECT IA WI 95 BBLS OF 110 DEGREE DIESEL
WI MAX 1300 PSI. U TUBE SAME. RD HOT OIL UNIT. DSM
INSTALL BPV TEST SAME.
05:00 - 06:00 1.00 RUNcor p COMP CLEAR FLOOR. COMPLETE CLEAN MUD TANKS.
RELEASE RIG FROM E 1030600 HRS 11/27/01
Printed: 11/27/2001 4:14:27 PM
~.
i'
~
05-Dec-01
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Definitive Surveys
Re: Distribution of Survey Data for Well E-103PB1 Gyro
c)lo/-dóO
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
0.00' MD
'MD
'MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECE~\/ED
DEC -11 2001
,Ajaska Oi! 8. Gas Cons. Commission
A~ct(ìr(]ge
DEFINITIVE
.
\"'.
'..- .b
'~j\
North Slope Alaska
Alaska Drilling & Wells
PBU_WOA E Pad, Slot E-103
E-103PB1 Gyro
Job No. AKZZ11180, Surveyed: 17 November, 2001
~----
SURVEY REPORT
4 December, 2001
~ "'t~'~
( .,-
. '
~ .
~.-
Your Ref: API 500292304970
Surface Coordinates: 5975476.91 N, 664480.22 E (70° 20' 21.4917" N, 148039' 54.8954" W)
Kelly Bushing: 63. 68ft above Mean Sea Level
~.
'"-
spe'-""'y-sUfl
DRILLING SERVICES
A Halliburton Company
Survey Ref: 5vy10990
Sperry-Sun Drilling Services
Survey Report for E-103PB1 Gyro
Your Ref: API 500292304970
Job No. AKZZ11180, Surveyed: 17 November, 2001
.
Alaska Drilling & Wells
North Slope Alaska PBU WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth' Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
L. 0.00 0.000 0.000 -63.68 0.00 O.OON 0.00 E 5975476.91 N 664480.22 E 0.00 Tolerable Gyro /--
c
115.00 0.200 18.000 51.32 115.00 0.19 N 0.06 E 5975477.10 N 664480.28 E 0.174 0.12
206.15 0.210 337.470 142.47 206.15 0.50N 0.05 E 5975477.41 N 664480.26 E 0.156 0.38
297.37 0.340 32.600 233.69 297.37 0.88N 0.13 E 5975477.79 N 664480.33 E 0.306 0.64
355.00 0.450 308.000 291.32 355.00 1.16 N 0.04 E 5975478.07 N 664480.24 E 0.933 0.92
450.00 1.350 284.000 386.30 449.98 1.66 N 1.34W 5975478.54 N 664478.85 E 1.007 2.13
533.00 1.750 292.000 469.27 532.95 2.37 N 3.46 W 5975479.21 N 664476.71 E 0.547 3.94
621.00 2.850 280.000 557.20 620.88 3.26N 6.86W 5975480.02 N 664473.29 E 1.358 6.64
711.00 3.200 281.000 647.08 710.76 4.13 N 11.53 W 5975480.78 N 664468.60 E 0.393 10.06
805.00 6.630 276.000 740.72 804.40 5.19 N 19.51 W 5975481.67 N 664460.61 E 3.674 15.57
901.00 11.250 283.000 835.53 899.21 7.88 N 34.15 W 5975484.04 N 664445.91 E 4.935 26.27
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Magnetic Declination at Surface is 26.556° (30-0ct-01)
L The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 324.450° (True).
~
Based upon Minimum Curvature type calculations, at a Measured Depth of 901.000.,
The Bottom Hole Displacement is 35.05ft., in the Direction of 282.995° (True).
~---~.
4 December, 2001 - 11 :03
Page 2 of 3
DrillQuest 2.00.08.005
North Slope Alaska
-,,--
Sperry-Sun Drilling Services
Survey Report for E-103PB1 Gyro
Your Ref: API 500292304970
Job No. AKZZ11180, Surveyed: 1.7 November, 2001
Survey tool program for E-103PB1 Gyro
l---
From
Measured Vertical
Depth Depth
(ft) (ft)
0.00
~_/
___H_- -- ------ ~
4 December, 2001 - 11:03
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
899.21
Tolerable Gyro
901.00
- ~-- - __n_-
-n-_n____-
Page 3 of 3
.
Alaska Drilling & Wells
PBU WOA E Pad
-/"--.
~---
__--_n- w
DrlllQuest 2.00.08.005
J
\
I~
05-Dec-01
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Definitive Surveys
Re: Distribution of Survey Data for Well E-103PB1
;;< 0 f - 01 Of..)
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 901.00' MD
Window / Kickoff Survey , MD
Projected Survey: 11,342.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
Carl Ulrich
Survey Manager
RE(~EIVED
Attachment(s)
DEC '11 2001
Ai~ì~¡{d ,.Iii i,J;: ~~$ i.;Qi1$, (:ürmr¡!ssiön
,d~w':i,~'Þr$l,gE
DEFINITIVE
'--
North Slope Alaska
Alaska Drilling & Wells
PBU_WOA E Pad, Slot E-103
E-103PB 1
Job No. AKZZ11180, Surveyed: 20 November, 2001
/--,
SURVEY REPORT
4 December, 2001
Your Ref: API 500292304570
Surface Coordinates: 5975476.91 H, 664480.22 E (700 20' 21.4917" H, 148039' 54.8954" W)
Kelly Bushing: 63. 68ft above Mean Sea Level
,
~-'
-,
sparry-suI!
DRILLING seRVices
A Halliburton Company
Survey Ref: 5vy11028
Sperry-Sun Drilling Services
Survey Report for E-103PB1
Your Ref: API 500292304570
Job No. AKZZ11180, Surveyed: 20 November, 2001
.
Alaska Drilling & Wells
North Slope Alaska PBU WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Inel. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
i 901.00 11.250 283.000 835.53 7.88 N 34.15 W 5975484.04 N AK-6 BP IFR-AK
\...../ 899.21 664445.91 E 26.27 /--
1027.07 10.690 290.270 959.30 1022.98 14.70 N 57.10 W 5975490.35 N 664422.81 E 1.183 45.16
1123.00 11.080 302.740 1053.52 1117.20 22.77 N 73.20 W 5975498.07 N 664406.53 E 2.483 61.09
1217.45 13.310 321,080 1145.86 1209.54 36.14 N 87.68 W 5975511.12 N 664391.77 E 4.704 80.38
1313.93 16.210 326.920 1239.16 1302.84 56.07 N 102.01 W 5975530.73 N 664377.01 E 3.375 104.93
1410.17 19.500 325.290 1330.75 1394.43 80.54 N 118.49 W 5975554.83 N 664359.99 E 3.457 134.42
1504.04 20.710 327.500 1418.90 1482.58 107.42 N 136.33 W 5975581.31 N 664341.57 E 1.522 166.66
1603.06 22.010 328.090 1511.12 1574.80 137.94 N 155.55 W 5975611.40 N 664321.69 E 1.331 202.66
1698.89 24.500 331.000 1599.16 1662.84 170.56 N 174.67 W 5975643.60 N 664301.85 E 2.861 240.33
1794.17 24.340 330.120 1685.91 1749.59 204.87 N 194.03 W 5975677.47 N 664281.74 E 0.417 279.50
1889.52 25.370 328.730 1772.43 1836.11 239.37 N 214.43 W 5975711.51 N 664260.59 E 1.242 319.42
1985.19 27.300 327.270 1858.17 1921.85 275.34 N 236.93 W 5975746.99 N 664237.31 E 2.128 361.78
2074.94 32,860 326.410 1935.80 1999.48 312.97 N 261.55 W 5975784.07 N 664211.87 E 6.213 406.70
2172.78 38.990 325.240 2014.99 2078.67 360.41 N 293.81 W 5975830.79 N 664178.57 E 6.304 464.06
2270.74 40.440 327.700 2090.35 2154.03 412.59 N 328.36 W 5975882.20 N 664142.88 E 2.183 526.60
2366.58 40.220 329.190 2163.41 2227.09 465.44 N 360.82 W 5975934.33 N 664109.27 E 1.032 588.48
2463.11 42.180 325.250 2236.05 2299.73 518.85 N 395.27 W 5975986.97 N 664073.66 E 3.368 651,96
2558.09 42.690 325.490 2306.15 2369.83 571.59 N 431.69 W 5976038.89 N 664036.10 E 0.563 716.04
. .0.- 2653.08 43.220 325.930 2375.67 -"
2439.35 625.07 N 468.15 W 5976091.56 N 663998.4 7 E 0.641 780.75
2749.57 43.320 325.910 2445.93 2509.61 679.85 N 505.21 W 5976145.51 N 663960.21 E 0.105 846.87
2844.01 43.330 329.890 2514.65 2578.33 734.72 N 539.63 W 5976199.61 N 663924.60 E 2.891 911.52
2940.38 42.390 326.440 2585.30 2648.98 790.40 N 574.18 W 5976254.52 N 663888.84 E 2.623 976.91
3036.64 43.180 322.870 2655.95 2719.63 843.70 N 612.01 W 5976306.99 N 663849.85 E 2.649 1042.27
3132.34 41.610 326.750 2726.64 2790.32 896.39 N 649.20 W 5976358.85 N 663811.51 E 3.188 1106.77
3226.62 41.720 328.220 2797.07 2860.75 949.24 N 682.89 W 5976410.94 N 663776.67 E 1.043 1169.35
3324.06 43.580 322.550 2868.76 2932.44 1003.49 N 720.41 W 5976464.36 N 663737.97 E 4.379 1235.30
3419.91 41.850 321.990 2939.19 3002.87 1054.92 N 760.19 W 5976514.90 N 663697.07 E 1.848 1300.27
3515.76 42.870 319.590 3010.02 3073.70 1104.94 N 801.02 W 5976564.01 N 663655.16 E 1.995 1364.71
3612.11 42.640 321.420 3080.76 3144.44 1155.41 N 842.62 W 5976613.56 N 663612.46 E 1.311 1429.96
3708.25 42.370 320.940 3151.64 3215.32 1206.02 N 883.34 W 5976663.26 N 663570.64 E 0.439 1494.81
4 December, 2001 - 11 :08
Page 2 of 6
DrillQucst 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for E-103PB1
Your Ref: API 500292304570
Job No. AKZZ111801 Surveyed: 20 Novemberl 2001
.
Alaska Drilling & Wells
North Slope Alaska PBU WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth - Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
\---- 3802.99 43.490 322.070 3221.01 3284.69 1256.53 N 923.49 W 5976712.88 N 663529.38 E 1.434 1559.25 -
3898.65 42.000 324.670 3291.26 3354.94 1308.61 N 962.24 W 5976764.09 N 663489.50 E 2.414 1624.15
3994.24 42.640 324.800 3361.94 3425.62 1361.16 N 999.40 W 5976815.81 N 663451.20 E 0.676 1688.51
4092.30 43.290 325.560 3433.70 3497.38 1416.02 N 1037.56 W 5976869.83 N 663411.85 E 0.848 1755.34
4186.86 43.830 326.310 3502.22 3565.90 1470.00 N 1074.05 W 5976923.00 N 663374.18 E 0.790 1820.48
4282.56 42.690 326.040 3571.91 3635.59 1524.49 N 1110.56 W 5976976.67 N 663336.49 E 1.207 1886.03
4378.81 44.470 325.910 3641.64 3705.32 1579.48N 1147.69W 5977030.83N 663298.16E 1.852 1952.36
4466.87 46.130 325.880 3703.58 3767.26 1631.30 N 1182.78 W 5977081.87 N 663261.94 E 1.885 2014.93
4561.69 45.750 325.710 3769.51 3833.19 1687.65 N 1221.09 W 5977137.37 N 663222.41 E 0.421 2083.05
4658.60 45.210 325.470 3837.46 3901.14 1744.66 N 1260.13 W 5977193.51 N 663182.12 E 0.585 2152.13
4754.27 45.180 325.770 3904.88 3968.56 1800.68 N 1298.46 W 5977248.67 N 663142.57 E 0.225 2219.99
4850.33 42.830 324.000 3973.97 4037.65 1855.27 N 1336.83 W 5977302.41 N 663103.02 E 2.761 2286.72
4946.6742.690 324.200 4044.71 4108.39 1908.26N 1375.18W 5977354.54N 663063.51E 0.202 2352.12
5042.20 42.290 324.120 4115.15 4178.83 1960.57 N 1412.96 W 5977406.01 N 663024.59 E 0.423 2416.65
5138.46 42.160 323.790 4186.43 4250.11 2012.87N 1451.03W 5977457.47N 662985.39E 0.267 2481.34
5233.37 41.880 323.840 4256.94 4320.62 2064.15 N 1488.54 W 5977507.91 N 662946.76 E 0.297 2544.87
5328.68 41.360 323.790 4328.19 4391.87 2115.24 N 1525.91 W 5977558.17 N 662908.28 E 0.547 2608.16
5423.98 40.910 323.480 4399.97 4463.65 2165.73 N 1563.08 W 5977607.83 N 662870.01 E 0.518 2670.85
5519.56 40.740 324.170 4472.29 4535.97 2216.17 N 1599.96 W 5977657.44 N 662832.03 E 0.504 2733.33 -',
5614.75 41.060 325.270 4544.24 4607.92 2267.04 N 1635.96 W 5977707.52 N 662794.93 E 0.828 2795.65
5706.45 40.500 325.920 4613.68 4677.36 2316.46 N 1669.80 W 5977756.18 N 662760.01 E 0.766 2855.53
5802.33 39.910 325.150 4686.91 4750.59 2367.49N 1704.82W 5977806.43N 662723.87E 0.805 2917.41
5902.43 40.360 324.950 4763.44 4827.12 2420.37 N 1741.79 W 5977858.49 N 662685.76 E 0.468 2981.93
5998,36 40.030 325.200 4836.71 4900.39 2471.13 N 1777.23 W 5977908.46 N 662649.21 E 0.383 3043.84
6094.87 39.650 325.490 4910.82 4974.50 2521.99 N 1812.39 W 5977958.54 N 662612.94 E 0.438 3105.66
6180.07 39.120 325.070 4976.67 5040.35 2566.43 N 1843.18 W 5978002.29 N 662581.18 E 0.696 3159.72
6278,21 40.630 324.820 5051.98 5115.66 2617.93 N 1879.32 W 5978052.99 N 662543.92 E 1.547 3222.63
6370.17 43,320 326.330 5120.35 5184.03 2668.67N 1914.07W 5978102.95N 662508.07E 3.124 3284.12
6462.23 43.780 326.530 5187.07 5250.75 2721.52 N 1949.14 W 5978155.02 N 662471.85 E 0.522 3347.51
6558.53 43.050 326.890 5257.02 5320.70 2776.84 N 1985.47 W 5978209.53 N 662434.32 E 0.800 3413.64
.---- --- -~
4 December, 2001 - 11 :08
Page 3 of 6
DriflQuf'.st 2.00.08.005
-,
Sperry-Sun Drilling Services
Survey Report for E-103PB1
Your Ref: API 500292304570
Job No. AKZZ11180, Surveyed: 20 November, 2001
.
Alaska Drilling & Wells
North Slope Alaska PBU WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth locI. Azim. Depth Depth - Northings Eastings Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
'- 6666.09 42.050 326.420 5336.26 5399.94 2837.60 N 2025.45 W 5978269.40 N 662393.01 E 0.976 3486.32 -~
6700.10 42.000 327.960 5361.52 5425.20 2856.74 N 2037.78 W 5978288.26 N 662380.26 E 3.035 3509.06
6795.31 42.440 326.920 5432.03 5495.71 2910.66 N 2072.22 W 5978341.41 N 662344.65 E 0.867 3572.95
6892.12 43.280 326.090 5503.00 5566.68 2965.57 N 2108.56 W 5978395.51 N 662307.11 E 1.045 3638.76
6988.32 44.200 326.370 5572.50 5636.18 3020.86 N 2145.53 W 5978449.98 N 662268.94 E 0.977 3705.24
7084.65 44.790 324.880 5641.21 5704.89 3076.58 N 2183.65 W 5978504.84 N 662229.61 E 1.245 3772.73
7180.94 44.670 325.290 5709.62 5773.30 3132.14N 2222.43 W 5978559.55 N 662189.61 E 0.325 3840.49
7272.50 45.330 324.460 5774.36 5838.04 3185.09 N 2259.69 W 5978611.67 N 662151.21 E 0.965 3905.23
7369.40 46.680 324.380 5841.67 5905.35 3241.79 N 2300.25 W 5978667.46 N 662109.41 E 1.394 3974.94
7465.69 45.520 324.530 5908.44 5972.12 3298.24 N 2340.58 W 5978723.01 N 662067.85 E 1.210 4044.32
7560.36 45.780 324.240 5974.61 6038.29 3353.27 N 2380.00 W 5978777.17 N 662027.23 E 0.351 4112.02
7655.85 43.920 324.040 6042.31 6105.99 3407.85 N 2419.45 W 5978830.87 N 661986.60 E 1.953 4179.36
7750.85 43.020 324.150 6111.25 6174.93 3460.79 N 2457.78 W 5978882.95 N 661947.12 E 0.951 4244.71
7846.73 41.270 326.060 6182.34 6246.02 3513.54 N 2494.59 W 5978934.88 N 661909.15 E 2.262 4309.04
7942.75 40.400 327.640 6254.99 6318.67 3566.10 N 2528.93 W 5978986.68 N 661873.67 E 1.407 4371.76
8037.53 40.890 326.500 6326.91 6390.59 3617.91 N 2562.49 W 5979037.74 N 661838.98 E 0.939 4433.43
8133.62 41 .230 326.610 6399.36 6463.04 3670.58 N 2597.28 W 5979089.63 N 661803.05 E 0.362 4496.51
8228.62 39.540 326.910 6471.72 6535.40 3722.06 N 2631.02 W 5979140.36 N 661768.18 E 1.791 4558.01
8324.72 39.470 326.800 6545.87 6609.55 3773.24 N 2664.45 W 5979190.80 N 661733.64 E 0.103 4619.09 -,
8420.07 39.050 325.930 6619.70 6683.38 3823.48 N 2697.87 W 5979240.29 N 661699.13 E 0.726 4679.39
8515.73 38.510 325.870 6694.27 6757.95 3873.10 N 2731.46 W 5979289.16 N 661664.46 E 0.566 4739.29
8612.83 38.450 325.910 6770.28 6833.96 3923.12 N 2765.34 W 5979338.42 N 661629.49 E 0.067 4799.69
8708.08 40.920 324.740 6843.58 6907.26 3973.13 N 2799.95 W 5979387.66 N 661593.79 E 2.709 4860.50
8803.72 43.420 323.040 6914.46 6978.14 4024.98 N 2837.80 W 5979438.67 N 661554.81 E 2.873 4924.69
8899,30 43.600 323.460 6983.78 7047.46 4077.70 N 2877.18 W 5979490.52 N 661514.29 E 0.356 4990.48
8996.27 43.140 321.590 7054.27 7117.95 4130.55 N 2917.68 W 5979542.46 N 661472.63 E 1 .407 5057.03
9091.97 42.860 322.270 7124.26 7187.94 4181.93 N 2957.93 W 5979592.95 N 661431.27 E 0.566 5122.23
9187.53 42.220 321.190 7194.67 7258.35 4232.65 N 2997.94 W 5979642.78 N 661390.15 E 1.016 5186.76
9282.86 41.750 321.030 7265.54 7329.22 4282.29 N 3037.98 W 5979691.53 N 661349.04 E 0.506 5250.43
9378.46 41.980 322.700 7336.73 7400.41 4332.47 N 3077.37 W 5979740.83 N 661308.55 E 1.190 5314. 16
_n_-
-------
4 December, 2001 - 11:08
Page 4 of 6
DrillQucst 2.00.08.005
. J
Sperry-Sun Drilling Services
Survey Report for E-103PB1
Your Ref: API 500292304570
Job No. AKZZ11180, Surveyed: 20 November, 2001
.
Alaska Drilling & Wells
North Slope Alaska PBU WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
'-- 9473.83 41.390 322.4 70 7407.96 7471.64 4382.84 N 3115.90 W 5979790.35 N 661268.92 E 0.639 5377.55 .-.
9569.66 42.320 324.200 7479.33 7543.01 4434.14 N 3154.08 W 5979840.79 N 661229.63 E 1.547 5441.47
9664.94 42.180 324.250 7549.86 7613.54 4486.11 N 3191.53 W 5979891.93 N 661191.05 E 0.151 5505.53
9760.92 44.410 324.630 7619.72 7683.40 4539.65 N 3229.80 W 5979944.62 N 661151.61 E 2.339 5571.35
9856.88 47.060 323.650 7686.69 7750.37 4595.33 N 3270.06 W 5979999.40 N 661110.14 E 2.857 5640.06
9952.69 51.390 323.880 7749.25 7812.93 4653.85 N 3312.93 W 5980056.96 N 661065.99 E 4.523 5712.59
10049.21 53.160 324.460 7808.30 7871.98 4715.74 N 3357.62 W 5980117.86 N 661019.96 E 1.894 5788.93
10144.19 55.800 325.760 7863.48 7927.16 4779.15 N 3401.82 W 5980180.29 N 660974.38 E 2.994 5866.22
10212.36 59.500 328.010 7899.96 7963.64 4827.39 N 3433.25 W 5980227.82 N 660941.90 E 6.101 5923.74
10279.08 61.330 329.830 7932.90 7996.58 4877.08 N 3463.20 W 5980276.84 N 660910.87 E 3.626 5981.58
10310.44 61.640 329.950 7947.87 8011.55 4900.92 N 3477.02 W 5980300.37 N 660896.53 E 1.044 6009.01
10343.00 60.910 332.310 7963.52 8027.20 4925.92 N 3490.81 W 5980325.06 N 660882.20 E 6.740 6037.37
10373.94 65.220 333.810 7977.53 8041.21 4950.50 N 3503.29 W 5980349.37 N 660869.17 E 14.585 6064.63
10406.60 69.750 335.130 7990.03 8053.71 4977.72 N 3516.29 W 5980376.30 N 660855.58 E 14.364 6094.33
10437.72 72.410 334.400 8000.12 8063.80 5004.35 N 3528.84 W 5980402.64 N 660842.45 E 8.831 6123.29
10471.04 75.310 333.320 8009.39 8073.07 5033.08 N 3542.94 W 5980431.06 N 660827.73 E 9.243 6154.87
10501.96 78.470 332.840 8016.40 8080.08 5059.92 N 3556.57 W 5980457.60 N 660813.51 E 10.331 6184.63
10533.16 81.480 331.960 8021.83 8085.51 5087.15 N 3570.81 W 5980484.50 N 660798.68 E 10.039 6215.06
10565.73 85.380 331.420 8025.55 8089.23 5115.63 N 3586.15 W 5980512.64 N 660782.72 E 12.087 6247.15 .---
10598.12 86.550 331.520 8027.83 8091.51 5144.01 N 3601.58 W 5980540.68 N 660766.67 E 3.625 6279.22
10630.18 87.780 329.910 8029.42 8093.10 5171.94 N 3617.24 W 5980568.26 N 660750.39 E 6.315 6311.05
10725.30 84.150 326.240 8036.11 8099.79 5252.45 N 3667.40 W 5980647.64 N 660698.49 E 5.420 6405.71
10814.30 83.830 324.980 8045.43 8109.11 5325.49 N 3717.39 W 5980719.57 N 660646.91 E 1.453 6494.20
10917.20 85.870 324.780 8054.67 8118.35 5409.31 N 3776.34 W 5980802.08 N 660586.13 E 1.992 6596.68
11013.65 86.000 323.670 8061.51 8125.19 5487.36 N 3832.58 W 5980878.88 N 660528.18 E 1.156 6692.88
11110.03 85.070 324.390 8069.01 8132.69 5565.13 N 3889.02 W 5980955.39 N 660470.05 E 1.219 6788.96
11205,50 87.290 323.310 8075.37 8139.05 5642.04 N 3945.21 W 5981031.05 N 660412.19 E 2.585 6884.21
11269.14 85.930 322.860 8079.13 8142.81 5692.83 N 3983.37 W 5981080.99 N 660372.93 E 2.251 6947.72
11342.00 85.930 322.860 8084.30 8147.98 5750.77 N 4027.25 W 5981137.95 N 660327.79 E 0.000 7020.37 Projected Survey
._-_.---_.~-------_.-
4 December, 2001 - 11 :08
Page 5 of 6
DriflQuest 2.00.08.005
. ..-
Sperry-Sun Drilling Services
Survey Report for E-103PB1
Your Ref: API 500292304570
Job No. AKZZ11180, Surveyed: 20 November, 2001
8'
~
.,..
Alaska Drilling & Wells
PBU WOA E Pad
North Slope Alaska
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
~
"'-..--' Magnetic Declination at Surface is 26.557° (30-0ct-01)
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 324.450° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 11342.00ft.,
The Bottom Hole Displacement is 7020.69ft., in the Direction of 324.997° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
11342.00
8147.98
5750.77 N
4027.25 W
Projected Survey
..r-~
"---.
Survey tool program for E-103PB1
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth
(ft) (ft)
Survey Tool Description
0.00
901.00
0.00
899.21
901.00
11342.00
899.21
8147.98
Tolerable Gyro (E-103PB1 Gyro)
AK-6 BP _IFR-AK (E-103PB1)
-- ~-- -~---
._~- - ---------~----
4 December, 2001 - 11 :08
Page 6 of 6
DriflQuest 2.00.08.005
(
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well E-103 MWD
~O 1-'c9. cro
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 10,310.44' MD
Window / Kickoff Survey 10,312.00' MD
Projected Survey: 12,240.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
Carl Ulrich
Survey Manager
Attachment(s)
"I"
~l
05-Dec-01
RECEIVED
DEC î 'l 2001
.. h,3':"c"" ~'. > ~'\.' ,)¡~ ¡ ;~.'~(';; ;GOtìi$, Commission
""'~~'",)"w ,,'~',,~ ."",l1<li--
"~".,~"",,~,.'èI,,..¡,;,
}o>;,~".;", ,"~~I>;¡
"'--,
North Slope Alaska
Alaska Drilling & Wells
PBU_WOA E Pad, Slot E-103
E-103PB1 MWD
Job No. AKMM11180, Surveyed: 4 December, 2001
...-c~.-
SURVEY REPORT
4 December, 2001
Your Ref: API 500292304570
Surface Coordinates: 5975476.91 N, 664480.22 E (700 20' 21.4917" N, 148039' 54.8954" W)
Kelly Bushing: 63. 68ft above Mean Sea Level
'-
-
spe""""'y-suf!
DRILLING SERVICES
A Halliburton Company
Survey Ref: 5vy11029
Sperry-Sun Drilling Services
Survey Report for E-103PB1 MWD
Your Ref: API 500292304570
Job No. AKMM11180, Surveyed:.4 December, 2001
.
Alaska Drilling & Wells
North Slope Alaska PBU WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth - Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
'--....- 901.00 11.250 283.000 835.53 899.21 7.88 N 34.15 W 5975484.04 N 664445.91 E 26.27 MWD Magnetic ~'.
1027.07 10.690 290.580 959.30 1022.98 14.76 N 57.08 W 5975490.41 N 664422.83 E 1.226 45.19
1123.00 11.080 303.060 1053.52 1117.20 22.91 N 73.14 W 5975498.21 N 664406.60 E 2.485 61.17
1217.45 13.310 321.480 1145.87 1209.55 36.38 N 87.52 W 5975511.36 N 664391.92 E 4.719 80.48
1313.93 16.210 327.360 1239.16 1302.84 56.41 N 101.71 W 5975531.08 N 664377.30 E 3.380 105.03
1410.17 19.500 325.760 1330.75 1394.43 81.01 N 117.99W 5975555.31 N 664360.48 E 3.456 134.51
1504.04 20.710 327.990 1418.90 1482.58 108.04 N 135.61 W 5975581.95 N 664342.28 E 1.526 166.74
1603.06 22.010 328.540 1511.12 1574.80 138.71 N 154.57 W 5975612.20 N 664322.64 E 1.328 202.73
1698.89 24.500 331.420 1599.16 1662.84 171.49 N 173.45 W 5975644.55 N 664303.05 E 2.856 240.37
1794.17 24.340 330.620 1685.91 1749.59 205.94 N 192.54 W 5975678.58 N 664283.21 E 0.386 279.50
1889.52 25.370 329.300 1772.43 1836.11 240.63 N 212.61 W 5975712.82 N 664262.39 E 1.227 319.39
1985.19 27.300 328.190 1858.17 1921.85 276.90 N 234.64 W 5975748.60 N 664239.56 E 2.082 361.71
2074.94 32.860 327.040 1935.80 1999.48 314.85 N 258.75 W 5975786.01 N 664214.62 E 6.228 406.61
2172.78 38.990 326.360 2014.99 2078.67 362.80 N 290.27 W 5975833.25 N 664182.06 E 6.279 463.94
2270.74 40.440 328.500 2090.35 2154.03 415.55 N 323.95 W 5975885.25 N 664147.23 E 2.034 526.44
2366.58 40.220 330.110 2163.41 2227.09 468.88 N 355.61 W 5975937.87 N 664114.41 E 1.111 588.24
2463.11 42.180 326.180 2236.05 2299.73 522.84 N 389.19 W 5975991.08 N 664079.65 E 3.363 651.67
2558.09 42.690 326.100 2306.15 2369.83 576.06 N 424.90 W 5976043.51 N 664042.79 E 0.540 715.73 ~~-
2653.08 43.220 326.530 2375.67 2439.35 629.92 N 460.80 W 5976096.57 N 664005.72 E 0.638 780.42
2749.57 43.320 326.490 2445.93 2509.61 685.07 N 497.29 W 5976150.91 N 663968.02 E 0.107 846.51
2844.01 43.330 330.490 2514.65 2578.33 740.30 N 531.14 W 5976205.38 N 663932.96 E 2.906 911.12
2940.38 42.390 327.110 2585.30 2648.98 796.36 N 565.08 W 5976260.68 N 663897.81 E 2.577 976.4 7
3036.64 43.180 323.490 2655.95 2719.63 850.09 N 602.30 W 5976313.58 N 663859.42 E 2.683 1041.82
3132.34 41.610 327.300 2726.64 2790.32 903.15 N 638.95 W 5976365.83 N 663821.61 E 3.145 1106.31
3226.62 41.720 328.810 2797.07 2860.75 956.33 N 672.11 W 5976418.27 N 663787.29 E 1.071 1168.86
3324.06 43.580 323.120 2868.76 2932.44 1010.96 N 709.08 W 5976472.07 N 663749.14 E 4.391 1234.79
3419.91 41.850 322.570 2939.18 3002.86 1062.78 N 748.34 W 5976523.02 N 663708.75 E 1.846 1299.78
3515.76 42.870 319.220 3010.02 3073.70 1112.87 N 789.08 W 5976572.20 N 663666.92 E 2.584 1364.22
3612.11 42.640 322.690 3080.77 3144.45 1163.65 N 830.27 W 5976622.07 N 663624,62 E 2.456 1429.49
3708.25 42.370 319.560 3151.66 3215.34 1214.21 N 871.03 W 5976671.72 N 663582.77 E 2.217 1494.32
---~-
-- -----....--
4 December, 2001 - 11:15
Page 2 of 6
DrillQlIC!st 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for E-103PB1 MWD
Your Ref: API 500292304570
Job No. AKMM11180, Surveyed:.4 December, 2001
.
Alaska Drilling & Wells
North Slope Alaska PBU WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth. Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 oott)
3802.99 43.490 320.740 3221.03 3284.71 1263.75 N 912.37 W 5976720.35 N 663540.35 E 1.455 1558.66 ~"'~
"-
3898.65 42.000 324.850 3291.29 3354.97 1315.42 N 951.63 W 5976771.14 N 663499.96 E 3.305 1623.53
3994.24 42.640 325.590 3361.97 3425.65 1368.28 N 988.34 W 5976823.18 N 663462.10 E 0.848 1687.88
4092.30 43.290 324.380 3433.73 3497.41 1423.02 N 1026.69 W 5976877.06 N 663422.56 E 1.071 1754.71
4186.86 43.830 328.240 3502.26 3565.94 1477.22 N 1062.81 W 5976930.46 N 663385.26 E 2.870 1819.81
4282.56 42.690 327.670 3571.95 3635.63 1532.81 N 1097.61 W 5976985.27 N 663349.25 E 1.259 1885.27
4378.81 44.470 327.880 3641.68 3705.36 1588.94 N 1132.99W 5977040.61 N 663312.65 E 1.855 1951.51
4466.87 46.130 325.860 3703.62 3767.30 1641.34 N 1167.21 W 5977092.25 N 663277.29 E 2.492 2014.04
4561.69 45.750 326.380 3769.56 3833.24 1697.91 N 1205.19 W 5977147.97 N 663238.07 E 0.562 2082.15
4658.60 45.210 325.900 3837.51 3901.19 1755.29 N 1243.69 W 5977204.49 N 663198.33 E 0.660 2151.21
4754.27 45.180 326.230 3904.92 3968.60 1811.61 N 1281.58 W 5977259.97 N 663159.21 E 0.247 2219.07
4850.33 42.830 324.530 3974.02 4037.70 1866.53 N 1319.47 W 5977314.04 N 663120.12 E 2.738 2285.78
4946.67 42.690 324.830 4044.75 4108.43 1919.90 N 1357.29 W 5977366.57 N 663081.14 E 0.257 2351.19
5042.20 42.290 324.850 4115.19 4178.87 1972.65 N 1394.45 W 5977418.50 N 663042.84 E 0.419 2415.71
5138.46 42.160 324.600 4186.47 4250.15 2025.46 N 1431.80 W 5977470.48 N 663004.33 E 0.221 2480.40
5233.37 41.880 324.940 4256.98 4320.66 2077.36 N 1468.45 W 5977521.56 N 662966.55 E 0.380 2543.93
5328.68 41.360 324.550 4328.23 4391.91 2129.05 N 1504.99 W 5977572.44 N 662928.89 E 0.610 2607.24
5423.98 40.910 326.600 4400.01 4463.69 2180.76 N 1540.43 W 5977623.35 N 662892.32 E 1.492 2669.91 ----
5519.56 40.740 325.270 4472.34 4536.02 2232.52 N 1575.43 W 5977674.33 N 662856.19 E 0.927 2732.37
5614.75 41.060 325.760 4544.29 4607.97 2283.89 N 1610.72 W 5977724.92 N 662819.79 E 0.476 2794.68
5706.45 40.500 326.300 4613.73 4677.41 2333.56 N 1644.19W 5977773.84 N 662785.24 E 0.722 2854.56
5802.33 39.910 325.730 4686.96 4750.64 2384.88 N 1678.78 W 5977824.39 N 662749.53 E 0.725 2916.42
5902.43 40.360 325.430 4763.49 4827.17 2438.11 N 1715.25 W 5977876.80 N 662711.90 E 0.489 2980.94
5998.36 40.030 325.450 4836.76 4900.44 2489.09 N 1750.37 W 5977927.01 N 662675.67 E 0.344 3042.84
6094.87 39.650 325.910 4910.87 4974.55 2540.16 N 1785.23 W 5977977.29 N 662639.69 E 0.498 3104.65
6180.07 39.120 325.500 4976.72 5040.40 2584.82 N 1815.69 W 5978021.28 N 662608.26 E 0.693 3158.70
6278.21 40.630 325.370 5052.03 5115.71 2636.63 N 1851.39 W 5978072.29 N 662571.44 E 1.541 3221.61
6370.17 43.320 326.780 5120.39 5184.07 2687.67 N 1885.70 W 5978122.57 N 662536.02 E 3.100 3283.08
6462.23 43.780 327.040 5187.12 5250.80 2740.81 N 1920.32 W 5978174.93 N 662500.23 E 0.536 3346.45
6558.53 43.050 327.480 5257.07 5320.75 2796.48 N 1956.12 W 5978229.80 N 662463.23 E 0.821 3412.55
---~~-~---~--~~
4 December, 2001 - 11:15
Page 3 of 6
DrillQuest 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for E-103PB1 MWD
Your Ref: API 500292304570
Job No. AKMM11180, Surveyed:.4 December, 2001
.
Alaska Drilling & Wells
North Slope Alaska PBU WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
.
Depth Incl. Azim. Depth Depth Northings Eastlngs Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
6666.09 42.050 326,950 5336.30 5399.98 2857.63 N 1995.50 W 5978290.08 N 662422.51 E 0.988 3485.20 .---.
;
~
6700.10 42.000 328.370 5361.57 5425.25 2876.86 N 2007.68 W 5978309.04 N 662409.91 E 2.799 3507.93
6795.31 42.440 327.360 5432.08 5495.76 2931.04 N 2041.71 W 5978362.45 N 662374.70 E 0.850 3571.80
6892.12 43.280 326.430 5503.04 5566.72 2986.20 N 2077.68 W 5978416.81 N 662337.53 E 1.086 3637.59
6988.32 44.200 326.910 5572.55 5636.23 3041.77 N 2114.22 W 5978471.57 N 662299.78 E 1.017 3704.05
7084.65 44.790 325.420 5641 .26 5704.94 3097.84 N 2151.82 W 5978526.80 N 662260.97 E 1.245 3771.52
7180.94 44.670 326.080 5709.67 5773.35 3153.85 N 2189.96 W 5978581.97 N 662221.61 E 0.498 3839.27
7272.50 45.330 325.370 5774.41 5838.09 3207.35 N 2226.42 W 5978634.65 N 662183.98 E 0.906 3904.00
7369.40 46.680 325.100 5841.72 5905.40 3264.62 N 2266.17 W 5978691.03 N 662142.98 E 1.408 3973.70
7465.69 45.520 325.140 5908.48 5972.16 3321.53 N 2305.84 W 5978747.06 N 662102.07 E 1.205 4043.07
7560.36 45.780 324.810 5974.66 6038.34 3376.97 N 2344.70 W 5978801.63 N 662062.01 E 0.371 4110.77
7655.85 43.920 324.560 6042.36 6106.04 3431.92 N 2383.62 W 5978855.72 N 662021.89 E 1.957 4178.11
7750.85 43.020 324.850 6111.30 6174,98 3485.26 N 2421.39 W 5978908.22 N 661982.96 E 0.970 4243.4 7
7846.73 41.270 326.640 6182,39 6246.07 3538.42 N 2457.61 W 5978960.57 N 661945.58 E 2.214 4307.78
7942.75 40.400 328.230 6255.04 6318.72 3591.33 N 2491.41 W 5979012.72 N 661910.63 E 1.412 4370.47
8037.53 40.890 327.050 6326.96 6390.64 3643.47 N 2524.45 W 5979064.13 N 661876.45 E 0.962 4432.11
8133.62 41.230 327.340 6399.41 6463.09 3696.53 N 2558.65 W 5979116.42 N 661841.10 E 0.406 4495.16
8228.62 39.540 327.070 6471,77 6535.45 3748.27 N 2591.98 W 5979167.42 N 661806.64 E 1.788 4556.64 ~"'~-
-- -- 8324.72 39.470 327.230 6545.92 6609.60 3799.62 N 2625.15 W 5979218.03 N 661772.36 E 0.129 4617.70
8420.07 39.050 326.440 6619.75 6683.43 3850.14 N 2658.15 W 5979267.81 N 661738.25 E 0.685 4677.99
8515.73 38.510 326.410 6694.32 6758.00 3900.05 N 2691.29 W 5979316.99 N 661704.03 E 0.565 4737.87
8612.83 38.450 326.370 6770.33 6834.01 3950.37 N 2724.73 W 5979366.56 N 661669.49 E 0.067 4798.25
8708,08 40.920 325.340 6843.63 6907.31 4000.70 N 2758.88 W 5979416.13 N 661634.24 E 2.683 4859.05
8803.72 43.420 323.4 70 6914.51 6978.19 4052.88 N 2796.27 W 5979467.48 N 661595.72 E 2.925 4923.25
8899.30 43.600 323.990 6983.83 7047.51 4105.94 N 2835.19 W 5979519.67 N 661555.64 E 0.419 4989.05
8996.27 43.140 322.280 7054.32 7118.00 4159.21 N 2875.14 W 5979572.05 N 661514.54 E 1.301 5055.61
9091.97 42.860 322.820 7124.31 7187.99 4211.03 N 2914.83 W 5979622.98 N 661473.72 E 0.483 5120.84
9187.53 42.220 321.800 7194.72 7258.40 4262.15 N 2954.32 W 5979673.23 N 661433.11 E 0.985 5185.41
9282.86 41.750 321.440 7265.58 7329.26 4312.14 N 2993.91 W 5979722.34 N 661392.43 E 0.554 5249.10
9378.46 41.980 323.620 7336.78 7400.46 4362.78 N 3032.72 W 5979772.11 N 661352.53 E 1_541 5312.86
~-_u --..
4 December, 2001 - 11: 15
Page 4 of 6
DrillQllest 2.00.08.005
. ,
Sperry-Sun Drilling Services
Survey Report for E-103PB1 MWD
Your Ref: API 500292304570
Job No. AKMM11180, Surveyed:.4 December, 2001
.
Alaska Drilling & Wells
North Slope Alaska PBU WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth' Northings Eastlngs Northings Eastlngs Rate Section Comment
(ft) (11) (ft) (ft) (ft) (ft) (ft) (0/100ft)
\ 9473.83 41.390 323.080 7408.00 7471.68 4413.66 N 3070.58 W 5979822.15 N 661313.56 E 0.724 5376.27 -~
"--/
9569.68 42.320 324.820 7479.40 7543.08 4465.37 N 3108.20 W 5979873.02 N 661274.81 E 1.552 5440.21
9664.94 42.180 324.670 7549.91 7613.59 4517.67 N 3145.18 W 5979924.50 N 661236.70 E 0.181 5504.26
9760.92 44.410 325.210 7619.76 7683.44 4571.55 N 3182.98 W 5979977.54 N 661197.73 E 2.355 5570.07
9856.88 47.060 324.350 7686.74 7750.42 4627.68 N 3222.61 W 5980032.78 N 661156.87 E 2.835 5638.79
9952.69 51.390 324.430 7749.29 7812.97 4686.65 N 3264.85 W 5980090.81 N 661113.35 E 4.520 5711.32
10049.21 53.160 325.080 7808.35 7872.03 4749.00 N 3308.90 W 5980152.18 N 661067.94 E 1.910 5787.66
10144.19 55.800 326.450 7863.53 7927.21 4812.91 N 3352.37 W 5980215.12 N 661023.08 E 3.017 5864.94
10212.36 59.500 328.580 7900.00 7963.68 4861.49 N 3383.27 W 5980263.01 N 660991.12 E 6.035 5922.43
10279.08 61.330 329.830 7932.94 7996.62 4911.33 N 3412.97 W 5980312.19 N 660960.33 E 3.190 5980.24
10310.44 61.640 329.460 7947.91 8011.59 4935.11 N 3426.90 W 5980335.65 N 660945.89 E 1.432 6007.69
10343.00 60.910 333.370 7963.57 8027.25 4960.17 N 3440.56 W 5980360.41 N 660931.68 E 10.766 6036.02
10373.94 65.220 336.280 7977.58 8041.26 4985.13 N 3452.27 W 5980385.11 N 660919.42 E 16.257 6063.14
10406.60 69.750 337.260 7990.09 8053.77 5012.85 N 3464.17 W 5980412.56 N 660906.92 E 14.144 6092.61
10437.72 72.410 335.300 8000.18 8063.86 5039.79 N 3476.01 W 5980439.24 N 660894.49 E 10.419 6121.42
10471.04 75.310 333.510 8009.44 8073.12 5068.65 N 3489.84 W 5980467.79 N 660880.03 E 10.118 6152.94
10501.96 78.470 333.410 8016.45 8080.13 5095.59 N 3503.29 W 5980494.43 N 660865.99 E 10.225 6182.68
10533.16 81.480 332.600 8021.88 8085.56 5122.96 N 3517.24 W 5980521.49 N 660851.45 E 9.980 6213.05 -.;e-.
~- 10565.73 85.380 332.360 8025.61 8089.29 5151.65 N 3532.19 W 5980549.84 N 660835.88 E 11.997 6245.09
10598.12 86.550 332.030 8027.89 8091.57 5180.23 N 3547.26 W 5980578.08 N 660820.18 E 3.752 6277.10
10630.18 87.780 330.310 8029.4 7 8093.15 5208.28 N 3562.70 W 5980605.79 N 660804.13 E 6.590 6308.90
10725.30 84.150 326.180 8036.17 8099.85 5288.94 N 3612.61 W 5980685.32 N 660752.46 E 5.772 6403.54
10814.30 83.830 324.500 8045.49 8109.17 5361.74 N 3662.94 W 5980757.00 N 660700.54 E 1.911 6492.04
10917.20 85.870 325.480 8054.72 8118.40 5445.67 N 3721.73 W 5980839.63 N 660639.92 E 2.198 6594.51
11013.65 86.000 324.560 8061.56 8125.24 5524.50 N 3776.89 W ' 5980917.23 N 660583.05 E 0.961 6690.71
11110.03 85.070 323.690 8069.06 8132.74 5602.36 N 3833.20 W 5980993.83 N 660525.05 E 1.319 6786.80
11205.50 87.290 324.180 8075.42 8139.10 5679.35 N 3889.27 W 5981069.58 N 660467.30 E 2.381 6882.04
11269.14 85.930 324.370 8079,19 8142.87 5730.93 N 3926.36 W 5981120.33 N 660429.08 E 2.158 6945.57
11342.00 85.930 324.370 8084.36 8148.04 5790.00 N 3968.70 W 5981178.46 N 660385.46 E 0.000 7018.25 Projected Survey
-- ------------
-----,---
4 December, 2001 - 11:15
Page 5 of 6
DrillQlIest 2.00.08.005
North Slope Alaska
Sperry-Sun Drilling Services
Survey Report for E-103PB1 MWD
Your Ref: API 500292304570
Job No. AKMM11180, Surveyed:.4 December, 2001
All data is in Feet (US) unless otherwise stated. Direc"tions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
'- Magnetic Declination at Surface is 26.557° (30-0ct-O1)
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 324.450° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 11342.00ft.,
The Bottom Hole Displacement is 7019.59ft., in the Direction of 325.572° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
11342.00
8148.04
5790.00 N
-'-.......-
Survey tool program for E-103PB1 MWD
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth
(ft) (ft)
0.00
901.00
0.00
899.21
901.00
11342.00
899.21
8148.04
--~-------- ----------
-----~-~--~-----
4 December, 2001 -11:15
3968.70 W
Projected Survey
Survey Tool Description
Tolerable Gyro (E-1 03PB 1 Gyro)
MWD Magnetic (E-103PB1 MWD)
Page 6 of 6
e'
Alaska Drilling & Wells
PBU_WOA E Pad
-"
--
------
Dri/lQlIüst 2.00.08.005
(
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Definative Surveys
Re: Distribution of Survey Data for Well E-103
à 0 )-.d) ð7...J
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 10,310.44' MD
Window / Kickoff Survey 10,312.00' MD
Projected Survey: 12,240.00' MD
(
05-Dec-01
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
Carl Ulrich
Survey Manager
Attachment(s)
RECEIVED
DEC 11 2001
AïaSk~ \)11 f~ ÙB~ Cons, ûmmissicm
,~m::f.()fgge
DEFINITIVE
--
North Slope Alaska
Alaska Drilling & Wells
PBU_WOA E Pad, Slot E-103
E-103
Job No. AKZZ11180, Surveyed: 20 November, 2001
---~
SURVEY REPORT
4 December, 2001
Your Ref: API 500292304500
Surface Coordinates: 5975476.91 N, 664480.22 E (70020' 21.4917" N, 148039' 54.8954" W)
Kelly Bushing: 63.68ft above Mean Sea Level
'-
spel'r1y-sul1
DRILLING seRVices
A Halliburton Company
Survey Ref: svy11030
Sperry-Sun Drilling Services
Survey Report for E-103
Your Ref: API 500292304500
Job No. AKZZ11180, Surveyed: 20 November, 2001
.
Alaska Drilling & Wells
North Slope Alaska PBU WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
.
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
,--. 10310.44 61.640 329.950 7947.87 8011.55 4900.92 N 3477.02 W 5980300.37 N 660896.53 E 6009.01 Tie On Point -~.~
10312.00 61.600 330.060 7948.61 8012.29 4902.10 N 3477.71 W 5980301.55 N 660895.82 E 6.713 6010.38 Window Point
10341.60 60.080 327.070 7963.03 8026.71 4924.16 N 3491.18 W 5980323.30 N 660881.86 E 10.206 6036.15
10373.85 60.220 326.390 7979.09 8042.77 4947.54 N 3506.52 W 5980346.34 N 660866.01 E 1.880 6064.10
10405.34 61.900 324.170 7994.32 8058.00 4970.19 N 3522.22 W 5980368.64 N 660849.82 E 8.156 6091.65
10438.11 64.590 323.990 8009.08 8072.76 4993.88 N 3539.39 W 5980391.95 N 660832.14 E 8.223 6120.91
10468.12 67.830 324.010 8021.18 8084.86 5016.10N 3555.53 W 5980413.80 N 660815.51 E 10.797 6148.37
10500.46 71.660 325.450 8032.37 8096.05 5040.86 N 3573.04 W 5980438.18 N 660797.46 E 12.558 6178.70
10533.11 76.080 325.530 8041.44 8105.12 5066.70 N 3590.80 W 5980463.63 N 660779.14 E 13.540 6210.05
10564.70 79.670 326.350 8048.08 8111.76 5092.29 N 3608.10 W 5980488.82 N 660761.29 E 11.644 6240.92
10597.14 82.290 326.400 8053.16 8116.84 5118.96 N 3625.84 W 5980515.10 N 660742.96 E 8.078 6272.94
10629.74 84.580 325.670 8056.89 8120.57 5145.82 N 3643.93 W 5980541.56 N 660724.29 E 7.368 6305.31
10661.54 87.350 323.740 8059.13 8122.81 5171.71 N 3662.26 W 5980567.04 N 660705.40 E 10.608 6337.03
10693.62 88.830 322.710 8060.20 8123.88 5197.39 N 3681.45 W 5980592.29 N 660685.64 E 5.620 6369.08
10726.30 87.410 321.070 8061.27 8124.95 5223.09 N 3701.61 W 5980617.54 N 660664.93 E 6.636 6401.71
10757.02 89.390 320.850 8062.13 8125.81 5246.94 N 3720.95 W 5980640.96 N 660645.07 E 6.485 6432.36
10789.13 91.660 319.730 8061.83 8125.51 5271.63 N 3741.46 W 5980665.20 N 660624.02 E 7.883 6464.38
10821.69 93.510 320.930 8060.36 8124.04 5296.67 N 3762.22 W 5980689.78 N 660602.71 E 6.770 6496.82 -~-
10853.35 94.190 321.140 8058.24 8121.92 5321.23 N 3782.09 W 5980713.90 N 660582.31 E 2.247 6528.35
10887.16 92.280 323.080 8056.33 8120.01 5347.87 N 3802.82 W 5980740.07 N 660561.01 E 8.045 6562.08
10918.63 91.540 323.640 8055.28 8118.96 5373.11 N 3821.59 W 5980764.89 N 660541.69 E 2.948 6593.52
10949.77 91.230 324.040 8054.53 8118.21 5398.24 N 3839.95 W 5980789.62 N 660522.77 E 1.625 6624.65
10981.84 89.750 323.830 8054.25 8117.93 5424.16 N 3858.83 W 5980815.12 N 660503.33 E 4.661 6656.72
11014.47 89.260 324.240 8054.54 8118.22 5450.57 N 3878.00 W 5980841.10 N 660483.59 E 1.958 6689.35
11078.71 90.250 324.910 8054.81 8118.49 5502.92 N 3915.23 W 5980892.62 N 660445.22 E 1.861 6753.59
11110.35 88.280 324.770 8055.22 8118.90 5528.78 N 3933.45 W 5980918.07 N 660426.44 E 6.242 6785.22
11141.70 88.520 324.760 8056.09 8119.77 5554.38 N 3951.53 W 5980943.27 N 660407.80 E 0.766 6816.56
11205.73 88.150 324.640 8057.95 8121.63 5606.61 N 3988.51 W 5980994.68 N 660369.68 E 0.607 6880.56
11270.10 89.080 324.200 8059.51 8123.19 5658.95 N 4025.95 W 5981046.18 N 660331.10 E 1.598 69411.91
11302.23 89.510 324.280 8059.90 8123.58 5685.02 N 4044.73 W 5981071.83 N 660311.76 E 1.361 6977 .04
_--om
--- -~--
4 December, 2001 - 11:13
Page 2 of 4
DrillQllest 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for E-103
Your Ref: API 500292304500
Job No. AKZZ11180, Surveyed: 20 November, 2001
.~
~
Alaska Drilling & Wells
North Slope Alaska PBU WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth' Northings Eastlngs Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
. 11364.59 90.250 324.260 8060.03 8123.71 5735.64 N 4081.14W 5981121.65 N 660274.24 E 1.187 7039.40 ~--=--
.............
11397.77 90.800 324.090 8059.73 8123.41 5762.54 N 4100.56 W 5981148.11 N 660254.23 E 1.735 7072.58
11444.56 90.610 324.760 8059.15 8122.83 5800.60 N 4127.78 W 5981185.56 N 660226.19 E 1.488 7119.36
11492.79 90.430 323.850 8058.72 8122.40 5839.76 N 4155.92 W 5981224.10 N 660197.19 E 1.923 7167.59
11542.82 88.220 324.440 8059.31 8122.99 5880.31 N 4185.22 W 5981263.99 N 660167.01 E 4.572 7217.61
11587.96 87.600 325.060 8060.95 8124,63 5917.15N 4211.26 W 5981300.25 N 660140.17 E 1.942 7262.72
11639.90 88.150 324.800 8062.88 8126.56 5959.63 N 4241.08 W 5981342.07 N 660109.43 E 1.171 7314.62
11683.05 86.800 325.320 8064.78 8128.46 5994.96 N 4265.77 W 5981376.86 N 660083.97 E 3.352 7357.73
11742.46 87.970 325.050 8067.49 8131.17 6043.69 N 4299.65 W 5981424.82 N 660049.03 E 2.021 7417.07
11780.42 91.110 324.800 8067.79 8131.47 6074.75 N 4321.46 W 5981455.40 N 660026.54 E 8.298 7455.02
11826.31 91.660 324.080 8066.68 8130.36 6112.07 N 4348.14 W 5981492.13 N 659999.05 E 1.974 7500.90
11876.50 93.080 323.250 8064.61 8128.29 6152.47 N 4377.85 W 5981531.86 N 659968.46 E 3.276 7551.04
11924.04 93.510 323.080 8061.88 8125.56 6190.45 N 4406.31 W 5981569.21 N 659939.18 E 0.972 7598.49
11973.09 93.820 323.150 8058.74 8122.42 6229.60 N 4435.69 W 5981607.71 N 659908.95 E 0.648 7647.42
12016.63 94.000 323.090 8055.77 8119.45 6264.35 N 4461.76 W 5981641.88 N 659882.12 E 0.436 7690.85
12070.08 94.560 324.160 8051.78 8115.46 6307.26 N 4493.37 W 5981684.09 N 659849.58 E 2.255 7744.15
12112.90 94.800 323.790 8048.29 8111.97 6341.78 N 4518.47 W 5981718.05 N 659823.73 E 1.028 7786.82
12166.05 94.800 323.130 8043.84 8107.52 6384.33 N 4550.00 W 5981759.90 N 659791.27 E 1.237 7839.78 .~~
12240.00 94.800 323.130 8037.65 8101.33 6443.29 N 4594.21 W 5981817.86 N 659745.77 E 0.000 7913.45 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Magnetic Declination at Surface is 26.55r (30-0ct-01)
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 324.450° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 12240.00ft.,
The Bottom Hole Displacement is 7913.45ft., in the Direction of 324.510° (True).
- ---... .
----.--
4 December, 2001- 11:13
Page 3 of 4
DríllQlIest 2.00.08.005
North Slope Alaska
Comments
"--
Measured
Depth
(ft)
10310.44
10312.00
12240.00
Sperry-Sun Drilling Services
Survey Report for E-103
Your Ref: API 500292304500
Job No. AKZZ11180, Surveyed: 20 November, 2001
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
8011.55
8012.29
8101.33
4900.92 N
4902.10 N
6443.29 N
Survey tool program for E-103
From
Measured Vertical
Depth Depth
(ft) (ft)
0.00
901.00
.~
4 December, 2001- 11:13
0.00
899.21
To
Measured Vertical
Depth Depth
(ft) (ft)
901.00
12240.00
899.21
8101.33
Comment
3477.02 W
3477.71 W
4594.21 W
Tie On Point
Window Point
Projected Survey
,
Survey Tool Description
Tolerable Gyro (E-103PB1 Gyro)
AK-6 BP _IFR-AK (E-103PB1)
~--~~-
Page 4 of 4
.-.".
~
Alaska Drilling & Wells
PBU WOA E Pad
-
-"'-.-
----~- ---
DrillQu(Jst 2.00.08.005
i
~
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
".1
,"I'
~,
Re: Distribution of Survey Data for Well E-103PB1 MWD
c9 0 I ~.' ~, ðL)
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 901.00' MD
Window / Kickoff Survey , MD
Projected Survey: 11 ,342.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
Carl Ulrich
Su rvey Manager
Attachment(s)
05-Dec-01
CE"/ED
E ,.1
DEC 'í 1 2001
'.' I' I . ' ',I" ¡'I,I;; (~r'1r\nrYI¡""!i")n
'\,'¡'~bi"""'" ': ,~¡¡ ,,~, 1¡,,¡ø¡~1 'vQ,Mo,l" "J'I.,¡ftIØ!l¡'" 11.,
1"'\ (l",I\"" ,'>1, ,,<, ",
il'I'I";;'.."j. "'r~n":
¡,¡~'..., .. .a".$~'
-~
North Slope Alaska
Alaska Drilling & Wells
PBU_WOA E Pad, Slot E-103
E-103 MWD
Job No. AKMM11180, Surveyed: 20 November, 2001
-
SURVEY REPORT
4 December, 2001
Your Ref: API 500292304500
Surface Coordinates: 5975476.91 N, 664480.22 E (70020' 21.4917" N, 148039' 54.8954" W)
Kelly Bushing: 63. 68ft above Mean Sea Level
"--
-~-
5par""'y-5UI!
DRILLING SERVIC:ES
A Halliburton Company
Survey Ref: 5vy11031
".
Sperry-Sun Drilling Services
Survey Report for E-103 MWD
Your Ref: API 500292304500
Job No. AKMM11180, Surveyed: 20 November, 2001
.
Alaska Drilling & Wells
North Slope Alaska PBU WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
,~
'. 10310.44 61.640 329.460 7947.91 8011.59 4935.11 N 3426.90 W 5980335.65 N 660945.89 E 6007.69 Tie On Point
--.
10312.00 61.600 330.060 7948.66 8012.34 4936.29 N 3427.59 W 5980336.82 N 660945.17 E 33.936 6009.05 Window Point
10341.60 60.080 328.440 7963.08 8026.76 4958.51 N 3440.80 W 5980358.74 N 660931.48 E 7.015 6034.81
10373.85 60.220 327.430 7979.13 8042.81 4982.21 N 3455.65 W 5980382.12 N 660916.11 E 2.751 6062.73
10405.34 61.900 325.320 7994.37 8058.05 5005.15 N 3470.91 W 5980404.72 N 660900.35 E 7.927 6090.27
10438.11 64.590 325.250 8009.12 8072.80 5029.20 N 3487.57 W 5980428.40 N 660883.16 E 8.211 6119.52
10468.12 67.830 324.740 8021 .22 8084.90 5051.69 N 3503.33 W 5980450.53 N 660866.92 E 10.908 6146.98
10500.46 71.660 326.120 8032.42 8096.10 5076.67 N 3520.53 W 5980475.13 N 660849.17 E 12.501 6177.31
10533.11 76.080 325.840 8041.49 8105.17 5102.66 N 3538.08 W 5980500.73 N 660831.06 E 13.563 6208.65
10564.70 79.670 326.660 8048.12 8111.80 5128.34 N 3555.23 W 5980526.02 N 660813.35 E 11.644 6239.52
10597.14 82.290 329.710 8053.21 8116.89 5155.56 N 3572.12 W 5980552.87 N 660795.87 E 12.306 6271.48
10629.74 84.580 328.410 8056.94 8120.62 5183.33 N 3588.77 W 5980580.27 N 660778.61 E 8.064 6303.76
10661.54 87.350 324.280 8059.17 8122.85 5209.73 N 3606.34 W 5980606.27 N 660760.46 E 15.610 6335.45
10693.62 88.830 323.370 8060.24 8123.92 5235.61 N 3625.27 W 5980631.73 N 660740.97 E 5.415 6367.51
10726.30 87.410 324.600 8061.32 8125.00 5262.03 N 3644.47 W 5980657.72 N 660721.20 E 5.747 6400.17
10757.02 89.390 324.440 8062.17 8125.85 5287.03 N 3662.29 W 5980682.33 N 660702.83 E 6.466 6430.88
10789.13 91.660 321.120 8061.88 8125.56 5312.59 N 3681.71 W 5980707.46 N 660682.85 E 12.524 6462.97
10821.69 93.510 325.030 8060.41 8124.09 5338.59 N 3701.25 W 5980733.02 N 660662.75 E 13.273 6495.48 _.
~-' 10853.35 94.190 323.620 8058.28 8121.96 5364.25 N 3719.67 W 5980758.27 N 660643.77 E 4.935 6527.06
10887.16 92.280 325.670 8056.38 8120.06 5391.78 N 3739.20 W 5980785.37 N 660623.64 E 8.280 6560.82
10918.63 91.540 325.600 8055.33 8119.01 5417.74 N 3756.95 W 5980810.93 N 660605.32 E 2.362 6592.26
10949.77 91.230 322.600 8054.57 8118.25 5442.96 N 3775.21 W 5980835.74 N 660586.52 E 9.682 6623.39
10981.84 89.750 321.770 8054.30 8117.98 5468.29 N 3794.87 W 5980860.64 N 660566.31 E 5.291 6655.43
11014.47 89.260 325.800 8054.58 8118.26 5494.61 N 3814.14 W 5980886.53 N 660546.46 E 12.441 6688.05
11078,71 90.250 327.690 8054.86 8118.54 5548.32 N 3849.37 W 5980939.46 N 660510.07 E 3.321 6752.24
11110.35 88.280 326.450 8055.26 8118.94 5574.88 N 3866.56 W 5980965.63 N 660492.29 E 7.357 6783.84
11141.70 88.520 326.310 8056.14 8119.82 5600.97 N 3883.91 W 5980991.34 N 660474.37 E 0.886 6815.16
11205.73 88.150 326.180 8058.00 8121.68 5654.19 N 3919.48 W 5981043.76 N 660437.65 E 0.612 6879.13
11270.10 89.080 324.410 8059.55 8123.23 5707.09 N 3956.11 W 5981095.84 N 660399.87 E 3.105 6943.47
11302.23 89.510 323.4 70 8059.95 8123.63 5733.06 N 3975.03 W 5981121.39 N 660380.39 E 3.217 6975.60
>_n_-
--- --- --~-----
---.---.--
4 December, 2001 - 11:18
Page 2 of 4
DrillQuest 2.00.08.005
~
Sperry-Sun Drilling Services
Survey Report for E-103 MWD
Your Ref: API 500292304500
Job No. AKMM11180, Surveyed: 20 November, 2001
.
Alaska Drilling & Wells
North Slope Alaska PBU WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth . Northlngs Eastlngs Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
~~~~-
\...-' 11364.59 90.250 322.780 8060.08 8123.76 5782.94 N 4012.45 W 5981170.44 N 660341.88 E 1.622 7037.94
11397.77 90.800 322.600 8059.78 8123.46 5809.33 N 4032.56 W 5981196.38 N 660321.20 E 1.744 7071.10
11444.56 90.610 324.790 8059.20 8122.88 5847.03 N 4060.26 W 5981233.47 N 660292.68 E 4.698 7117.88
11492.79 90.430 321.180 8058.76 8122.44 5885.54 N 4089.28 W 5981271.32 N 660262.81 E 7.494 7166.09
11542.82 88.220 324.530 8059.35 8123.03 5925.40 N 4119.49 W 5981310.52 N 660231.74 E 8.021 7216.08
11587.96 87.600 326.280 8061.00 8124.68 5962.54 N 4145.10 W 5981347.08 N 660205.32 E 4.110 7261 . 18
11639.90 88.150 325.640 8062.92 8126.60 6005.55 N 4174.15 W 5981389.44 N 660175.33 E 1.624 7313.07
11683.05 86.800 325.150 8064.83 8128.51 6041.03 N 4198.63 W 5981424.38 N 660150.08 E 3.328 7356.17
11742.46 87.970 327.030 8067.54 8131.22 6090.28 N 4231.74 W 5981472.89 N 660115.90 E 3.724 7415.49
11780.42 91.110 326.800 8067.84 8131.52 6122.08 N 4252.46 W 5981504.23 N 660094.49 E 8.294 7453.41
11826.31 91.660 325.4 70 8066.73 8130.41 6160.17 N 4278.02 W 5981541.75 N 660068.10 E 3.135 7499.27
11876.50 93.080 324.790 8064.66 8128.34 6201.31 N 4306.69 W 5981582.26 N 660038.53 E 3.136 7549.41
11924.04 93.510 324.370 8061.92 8125.60 6239.99 N 4334.20 W 5981620.32 N 660010.18E 1.263 7596.87
11973.09 93.820 324.980 8058.79 8122.47 6279.93 N 4362.50 W 5981659.63 N 659981.01 E 1.393 7645.82
12016.63 94.000 323.050 8055.82 8119.50 6315.07 N 4388.02 W 5981694.21 N 659954.72 E 4.442 7689.25
12070.08 94.560 326.000 8051.83 8115.51 6358.48 N 4418.95 W 5981736.92 N 659922.85 E 5.603 7742.55
12112.90 94.800 325.330 8048.34 8112.02 6393.72 N 4443.02 W 5981771.62 N 659898.01 E 1.657 7785.21
12166.05 94.800 322.870 8043.89 8107.57 6436.62 N 4474.08 W 5981813.83 N 659866.02 E 4.612 7838.17 ~,.~
'-- 12240.00 94.800 322.870 8037.70 8101.38 6495.37 N 4518.56 W 5981871.59 N 659820.26 E 0.000 7911.84 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Magnetic Declination at Surface is 26.557° (30-0ct-01)
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 324.450° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 12240.00ft.,
The Bottom Hole Displacement is 7912.47ft., in the Direction of 325.175° (True).
------
---_.--
4 December, 2001 - 11:18
Page 3 of 4
DrillQfJest 2.00.08.005
..-
North Slope Alaska
Comments
I.
---
Measured
Depth
(ft)
10310.44
10312.00
12240.00
Sperry-Sun Drilling Services
Survey Report for E-103 MWD
Your Ref: API 500292304500
Job No. AKMM11180, Surveyed: 20 November, 2001
.
4935.11 N
4936.29 N
6495.37 N
Survey tool program for E-103 MWD
Alaska Drilling & Wells
PBU WOA E Pad
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
8011.59
8012.34
8101.38
From
Measured Vertical
Depth Depth
(ft) (ft)
0.00
901.00
-'--'-
4 December, 2001 - 11: 18
0.00
899.21
To
Measured Vertical
Depth Depth
(ft) (ft)
901.00
12240.00
899.21
8101.38
.--
Comment
3426.90 W
3427.59 W
4518.56 W
Tie On Point
Window Point
Projected Survey
Survey Tool Description
Tolerable Gyro (E-1 03PB 1 Gyro)
MWD Magnetic (E-103PB1 MWD)
,..---
Page 4 of 4
DrillQuest 2.00.08.005
~
(
(
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed:
Liner Patch! Acid
2. Name of Operator
BP Exploration (Alaska), Inc.
3. Address
P. O. Box 196612
Anchorage, AK 99519-6612
4. Location of well at surface
Operation shutdown-
Pull tubing
1586' FNL, 501' FEL, Sec. 06, T11N, R14E, UM
At top of productive interval
20001 FNL,39391 FEL,Sec. 31, T12N, R14E, UM
At effective depth
8941 FNL, 47291 FEL, Sec. 31, T12N, R14E, UM
At total depth
4231 FNL, 208'FEL, Sec. 36, T12N, R13E,UM
12. Present well condition summary
Total depth: measured
true vertical
Effective depth:
measured
true vertical
Casing
Conductor
Length
104'
4462'
Size
2011
10-3/411
7-5/811
4-1/211
Surface
Production
Liner
102411
15261
Stimulate _X
Alter casing
5. Type of Well:
Development _X
Exploratory-
Stratigraphic-
SeNice
(asp's 664480, 5975478)
(asp's 660918, 5980267)
(asp's 660100, 5981355)
(asp's 659746,5981819)
12240 feet
8101 feet
Plugs (measured)
11655 feet
8127 feet
Junk (measured)
Cemented
260 sx AS (Approx)
930 sx AS Lite, 342 sx
lGI
307 sx Class 'Gl
342 sx Class lGI
Perforation depth:
measured Slotted Liner 107291 - 116551
true vertical Slotted Liner 8125' - 8127'
Tubing (size, grade, and measured depth) 5-1/211,17#, 13-CR-80, TBG to 47301; 5-1/211 X 4-1/211 TBG XO @ 4731'; 4-1/211,
12.6# 13-CR-80 TBG to 10118'.
Packers & SSSV (type & measured depth) 7-5/811 x 4-1/211 BKR S-3 PKR @ 10072'MD. 7-5/811 x 5-1/211 BKR ZXP PKR @ 1011T MD.
7-5/811 x 5-1/211 BKR HMC HGR @ 101231 md. 5-1/211 x 4-1/211 XO @ 10129' MD.
4-1/211 DWP Patch @ 10643'. Two BKR ECPs @ 106621 & 11679'. 5-1/211 HES IX' NIP @ 2174'.
13. Stimulation or cement squeeze summary
Intervals treated (measured) (see attached)
Treatment description including volumes used and final pressure
14. Representative Dailv Averaae Production or Injection Data
Oil-Bbl Gas-Met Water-Bbl
Shut-In
Prior to well operation
02/14/2002
Subsequent to operation 02/21/2002
15. Attachments
Copies of Logs and Surveys run -
Daily Report of Well Operations Oil X Gas
17. I hereby certify that the foregoing ~ tñe and correct to the best of my knowledge.
4~~~ TItle: Techical Assistant
DeWayne R. Schnorr
970
Form 1 0-404 Rev 06/15/88 .
Plugging - Perforate -
Repair well X Other -
6. Datum elevation (DF or KB feet)
RKB 65 feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
E-103
9. Permit number I approval number
201-2000 I 302-036
10. API number
50-029-23045-00
11. Field I Pool
Prudhoe Bay Field I Midnight Sun Pool
Measured Depth
1331
4491'
True Vertical Depth
1331
37841
10270'
7992'
7918' - 812T
REŒIVED
MAR 0 7 2002
Alaska Oil & Gas Cons. Commission
Anchorage
Casinç¡ Pressure
Tubinç¡ Pressure
31592
16. Status of well classification as:
ORIGINAL
6
1599
Suspended
Service
Date Februarv 28. 2002
Prepared by DeWayne R. Schnorr 564.5174
~
SUBMIT IN DUPL~
(
(
E-103
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
02/15/2002 DRILL-POST WORK: PATCH TUBING / CASING
02/17/2002 DRILL-POST WORK: PATCH TUBING / CASING
02/18/2002 DRILL-POST WORK: PATCH TUBING / CASING
02/19/2002 DRILL-POST WORK: PATCH TUBING / CASING
02/15/02
02/17/02
02/18/02
02/19/02
EVENT SUMMARY
RIH W/3.011 OJ NOZZLE. ENCOUNTER HYDATES AT 1800'. PUMPING 60/40
METHANOL, JET THROUGH DOWN TO 2300', BREAK THROUGH HYDRATES.
RIH TO 10,750' CTMD. POOH. RIG UP TO RUN 3.80511 x19.58' DMY TBG PATCH.
BHA OAL=28.36', STAB ON & PUMP KILL VOL 2% KCL & FREEZE PROTECT
TBG TO 20001. RIH WITH DRIFT. SAT DOWN AT 10,684' CTMD. COULD NOT
GET DEEPER. POOH. FP FLOWLINE WITH 50 BBLS - 60/40 METHANOL. LAY
DOWN DUMMY TBG PATCH. HOLD RISK ASSESSMENT MEETING. WAIT ON
HIGH WINDS.
RIH WITH PATCH. SAT DOWN AT 106341 CTMD. COULD NOT GET DEEPER.
LOGGED UP TO 9900' AT 60 FPM. LOG WAS INCONCLUSIVE WHEN
COMPARED TO LINER TALLY. RBIH AND SAT DOWN AT SAME, 106341.
LOGGED AT 15 FPM AND INCREASED TO 20 FPM UP TO 9900'. LOG SHOWED
SOME CORRELATABLE COLLARS. RBIH FOR THIRD PASS. TAGGED SAME.
LOGGED UP AT 20 FPM TO 99001. 3RD PASS HAD SOME REPEAT TO THE 2ND
PASS BUT NOTHING CONCLUSIVE, POOH. BREAK OUT PATCH, (TOOL
PACKED WITH DRY CHUNKY ASPHAL TENES & METAL SHAVINGS). RIH WITH
MEMORY CCL GAMMA TO 107501 - 98991 CTMD, POOH. LOG INDICATES THAT
THE PATCH HAD REACHED A CORRECTED DEPTH OF 106121. RU TO JET
WASH LINER. RIH WITH 3.0011 JS NOZZLE.
RIH W/ 311 JS NOZZLE. JET WASH LINER TO 107501 CTMD WITH 150/0
XYLENE/DIESEL. CHASE OUT OF HOLE WITH CRUDE. FP FLOWLINE WITH
50 BBLS OF 60/40 METHANOL. RIH DS REAL TIME CCL, BOT #10 SETTING
TOOL & 3.78511 X 19.801 DWP TBG PATCH. LOG AND TIE INTO SWS MEMORY
CCUGR (02/17/2002). POSITION AND SET PATCH ACROSS CEMENTER
(CEMENTER @ 10656 - 581 CORRECTED), TOP OF PATCH @ 10643', TOP
ELEMENT @ 10647.5" BOTTOM ELEMENT @ 10663'. POOH. TOOLS
INDICATED GOOD SET.
MU 2.2511 JET SWIRL NOZZLE. RIH. JET WASH LINER FROM 107501 TO 11630'
WITH 50 BBLS OF 15%XYLENE/DIESEL. LAY IN 40 BBLS 7.50/0 HCL ACID FROM
116301 TO 9000' CTMD, LET SOAK FOR 30 MINUTES WHILE RIH TO TD. JET
REMAINING 30 BBLS OF HCL ACID ACROSS SLOTTED LINER, FOLLOWED
WITH 2% KCL PULLED ABOVE LAYED IN ACID, RUN IN HOLE PUMPING OVER
FLUSH. INJECTION PRESSURE BUILDING STEADILY, REACHED 1500 PSI AT
0.7 BPM WHEN NOZZLE REACHED TO (54 BBLS KCL BEHIND PIPE). I
Page 1
(
f
E-103
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
02/19/02
(CONTINUED)
THOUGHT THE FORMATION WAS STARTING TO PLUG OFF AND CHOSE TO START
OUT OF THE HOLE BEFORE PUMPING ALL OF THE OVER FLUSH, ONLY PUMPING
APPROXIMENTL Y 70 BBLS BEHIND PIPE TOTAL. ALSO, I DID NOT ESTABLISH AN
INJECTION RATE. BULLHEADED AN ADDITIONAL 30 BBLS 2% KCL TO DETERMINE AN
INJECTION RATE AS WELL AS GET MORE WATER BEHIND PIPE. INJECTION RATE
1300 @ 1.5 BPM. «< POP WELL AND REQUESTED WELL TEST AFTER 4 HOURS
FLOWING »>
FLUIDS PUMPED
BBLS
621 60/40 METHANOL WATER
555 2% KCL WATER
288 CRUDE
152 15% XYLENE/DIESEL
75 7.5% HCL ACID (ACID TITRATION OF 7.5% IRON < 22 PPM.)
1691 TOTAL
Page 2
.
(
TREE =
5-1/8" Ftv'C
WB...LH6t\ D = Ftv'C
ACTtJI\ TOR = Nð.
KB. 8..EV = 64.90'
BF. 8..EV = 33.85'
KOP= 900'
M3x Angle = 94 @ 10853'
Q:¡tum M) =
Q:¡tum TVD = 8800' 55
10-3/4" CSG, 45.5#, L-80, ID = 9.950"
5-1/2"TBG, 17#, 13-CR-80, .0232 bpf,lD =4.892"
4491'
4730'
Min imum ID = 2.375" @ 10643'
4.112" DWP P ATC H (20' LONG)
14-1/2" TBG, 12.6#, 13-CR-80, .0152 bpf, ID = 3.958" (
10072'
10110'
1 011 T
TOP OF BKR C-2 TIEBACK SLV, D = 5.750"
17-5/8" X 5-1(2" BKRZXP PKR, ID = 4.982" I
(7 -5/8" X 5-1/2" BKR H"v1C HGR, ID = 4.982" I
10123'
7 -518" CSG, 29.7#, L-80, ID = 6.875"
10270'
ÆRFORA TlON SlJv1MARY
REF LOG: SÆRRY-SlJ'J MNOON 11/17101
ANGLE AT TOP PERF: 87 @ 10729'
Note: Refer !o Production 00 for historical perf data
SIZE SA= INTERVAL Opn/Sqz DATE
4-1/2" SLTD 10729-11655 0 11/27/01
E-103
-i
2174'
4731'
L
ST MD 1VD
4 4775 3919
3 7196 5719
2 9254 7242
1 9949 7745
10051'
10072'
10105'
10116'
10118'
('
SAFETY NOTES: WB..L A!«;LE> 700@ 10485'
& >90o@ 10770'. DNPPATCHSET@ 10643.
(20' LONG - SEE [JAGRAM ON FILE).
995"
H1O-3/4" TAM PORT COLLAR I
5-1/2" HES X NIP, ID = 4.562"
5-1/2" X 4-1/2" TBG XO, ID = 3.958"
GAS LFT MANDRELS
DEV 1Y Æ VL V LATCH
44 KBG-2 LV BK
44 KBG-2 SO BK
42 KBG-2 rN BK
49 KBG-2 rN BK
PO Rf Dð. TE
0 11/27,u 1
0 11/27,u1
0 11/27101
SHEAR 11/27,u1
4-1/2" HES X NIP, 10= 3.813"
7-5/8" X 4-1(2" BKRS-3 PKR, D =3.875"
-14-1/2" HES X NIP, 10 = 3.813" I
4-1/2" TBG, 12.6#, 13-CR-80,
.0152 bpf, 10 = 3.958"
-i4-1/2"WLEG, ID= 3.958" I
10129' 5-1/2" X 4-1 f2" XO, ID = 3.970"
10252' -i 4-1/2" PLP JT W/RA TAG (201) I
14-1/2" LNR, 12.6#, L-80, .0152 bpf, ID = 3.958" 1-1 10729'
IBTM OF 4-1/2" SLTD LNR I
4-1(2" SL TD LNR, 12.6#, L-80, .0152 bpf, ID = 3.958"
3-1(2" ABANDONIVENT STRNG
(6-314" OP8\J H:>LE TD
DATE REV BY CO Mv18\JTS Dð.TE REV BY COMIVENTS
11/27/01 ORIGINAL CO rvPLETION
12/28/01 CI-VTP NEW WELL
02/20/02 S RB/th DNP PA TŒi
4-112" DWP PA TCH, ID = 2.375" x 20' LONG
BKR EŒ> PAYZONE A<R,ID = 3.930"
1 0729'
TOPOF 4-1/2" SLTD LNR,
ID = 3.958"
"
"
,
,
,
,
,
,
,
1 11677' H PBTD
~ 11679' HBKREŒ> I
11653'
11655'
LISBURNE lJ'J1T
W8..L: 6-103
PERMIT No: 201-2000
API No: 50-029-23045-00
SEC 6, T11N, R14E 1586' SN... & 501' WEL
BP Exploration (Alaska)
E-103 CT Set Patch
;~
(
.
Subject: E.103 CT Set Patch
Date: Tue, 29 Jan 2002 15:20: 13 -0600
From: "Young, Jim" <YoungJ3@BP.com>
To: "Tom Maunder (E-mail)" <tom_maunder@admin.state.ak.us>
Hi Tom,
If you have excel97 or newer you should be able to read E-103 DWP .xls which
contains a drawing on the DWP. This patch will only be in the well long
enough to isolate the leak/stimulate the horizontal and then determine if we
have productivity which will justify a cement squeeze or if we need to
sidetrack.
Let me know if you can't open & i'll be glad to send a fax.
Jim Young
, PE, GPB New Developments
youngj3@bp.com
(907) 564-5754 fax 5016
> -----Original Message-----
> From: Young, Jim
> Sent: Wednesday, January 16, 2002 2:02 PM
> To: G ANC Wellwork Program
> Cc: Deckert, Steven L
> Subject: E-103 CT Program addendum
>
> Here is the FINAL CT program for E-103, including tbg/liner tally & specs
> on the HES(A VA) tubing patch.
>
> Thanks
> Jim Young
> PE, GPB New Developments
> youngj3@bp.com
> (907) 564-5754 fax 5016
>
>
>
> «E-103 4.5 slotted Liner .ZIP» «E-103 DWP.ZIP»
1:::::::::::===:""""",:".,"""""","","""""""""""""",,,",,,""","',"'"""""""""""',"'"",'^""'".",.",,,,.,::::::::.::::::::=:::::::::::':.==.=:::.::::::::::-M::=-'=::::::::::::.:==:'=:::==:::'::::=:=::::::"""""'""",'.'"."',""'::::,:,====
r""",-"""""""""."""."""""""""""".,,""""""""'."'M~'"""""""""""""""'.""""""""""."'T"""-"""""""""""""""""...""...".,.....""...."",.".......""""",...".."......................,.....",."....."........-..."..",.............."".......".""".""...."...",..."".."............",....",..",..."....."......""."....".."..................."... ¡
¡ . Name: E-103 4.5 slotted Liner .ZIP
: ~ E-1 03 4.5 slotted Liner .ZIP; T~pe: Zip Compressed Data (application/x-zip-compressed) ,
'Encoding: base64 !
Name: E-103 DWP.ZIP
~E-103 DWP.ZIP T~pe: Zip Compressed Data (application/x-zip-compressed) ,
, Encoding: base64 :
",--->".." , ""'.'-".."',."'.."'."""""T".""'."""""""""""-"-,.. ",'".. ,.......,........".... ."",'w'"',,,'>"-""
1 of 1
1 /29/02 12:41 PM
(
. 82JTS',ON:RACK
2593~Q9 FT ON RACK
Guide shoe from Baker
Joints #1 - #31 4 1/2" 12.6# L-80 BTCM slotted liner
HES Float Collar
One Joint 4 1/2" 12.6# L-80 BTCM
Halliburton Landin collar
Pu Joint 4 1/2" 12.6# L-80 BTCM
Baker ECP a zone acker
Pu Joint 4 1/2" 12.6# L-80 BTCM
Halliburton ES T e H cementer
Jt # 4 - #6 Solid liner Jts
Pu Jt. 4 1/2 12.6# L-80 BTCM casin
Jt # 7 - #12 Solid liner Jts
Pu Jt. 4 1/2 12.6# L-80 BTCM casin
Jt # 13 - 15 Solid liner Jts
Pu Jt. 4 1/2 12.6# L-80 BTCM casin
Cross over 5.5 BTC to 4.5 1ST
Liner han er 5.5 x 7.625
ZXP Packer wI C2 Profile 5.5 x 7.625
{
4112""'~isÙlg])ëtaU
" 'RIG Ðoyon.14
weLL # ' E103
'CS~~4.5BTCL~O
CSG. WT. 12.6#
OD
5.240
5.250
5.250
5.250
5.250
5.250
5.630
5.250
5.625
5.250
5.250
5.25
5.25
5.25
5.25
6.020
6.520
6.55
JTS RAN
FT. RAN .
LENGTH
1.88
923.94
1.50
39.03
1.27
2.50
23.11
9.40
2.30
122.44
19.81
235.80
19.81
117.25
3.78
1.76
6.05
13.43
Date
11/21101
31.05 . RT -SF
TOP
11653.12
10729.18
10727.68
10688.65
10687.38
10684,88
10661.77
10652.37
10650.07
10527.63
10507.82
10272.02
10252.21
10134.96
10131.18
10129.42
10123.37
10109.94
BOTTOM
11655.00
11653.12
10729.18
10727.68
10688.65
10687.38
10684.88
10661.77
10652.37
10650.07
10527.63
10507.82
10272.02
10252.21
10134.96
10131.18
10129.42
10123.37
Attach 3 turbulators er 2 ts. On the last 14 'ts. On 'ts. That have 2 turbulators each---secure 7' from each end. On 'ts.
that have one each----secure in middle of 't.
Rabbit all i e oin into hole.
\"-'~A. 'll ~ 10<-
STATE OF ALASKA ( k:t \ , I í IÄ
ALASKA OIL AND GAS CONSERVATION COMMISSION J)~ ¿. 1¡w ¿
APPLICATION FOR SUNDRY APPROVALS J{\ÎH J-f(;/o:J-
7992'
,!~~j\I~8' - 812T
J~I"',~' ~.' "'CI"II>,
~ ~\.~~' I!\th
. 0, '~-" '::.
~~ "I' """'.".' ,".', ..,.'."",'.'1'...'-
'., " "'.. ,/ \,i.'::';',./¿" .'.'" ¡..'.~""~
.". I'. :", 'if ~'" 1;:1 ¡',\
'.",.,.", ,.:i A'
¡ .'~"'"
fUr if ;1, II ....
II i?" "J:
¡,¡ ¡ ..., 11]1 .,. 8i'
, ¡aSk? ():/. '~tI'Rt3
!I;i" I' fI rl V'Wt
I Ü~ t:J'aS C
AI" R. OnS e
!lCnD "~" . ",,'Oflif/ :""cI'!II
5-1/211 TBG to 4731'; 5-1/211 x 4-1/211 TBG XO @ 4731'; 4-1/211 TBG to 1 0118' r~~lf)1 1I'~'ìïOr¡
(
Abandon- Suspend-
Alter casing - Repair well _X
LINER PATCH Change approved program-
2. Name of Operator
BP Exploration (Alaska), Inc.
3. Address
P. O. Box 196612
Anchora e, AK 99519-6612
4. Location of well at surface
1. Type of request:
1586' FNL, 501' FEL, Sec. 06, T11N, R14E, UM
At top of productive interval
2000' FNL, 3939' FEL, SEC 31, T12N, R14E, UM
At effective depth
894'FNL,4729'FEL,Sec.31, T12N, R14E,UM
At total depth
423' FNL, 208' FEL, Sec 36 T12N, R13E, UM
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing Length
Conductor 104'
Surface 4462'
Production 1 024 l'
Liner 1526'
Size
2011
10-3/411
7-5/8"
4-1/2"
Perforation depth:
Operational shutdown -
Plugging -
Pull tubing -
5. Type of Well:
Development _X
Exploratory -
Stratigraphic -
Service-
(asp's 664480, 5975478)
(asp's 660918, 5980267)
(asp's 660100,5981355)
(asp's 659746, 5981819)
12240 feet
8101 feet
11655 feet
8127 feet
Plugs (measured)
Junk (measured)
Cemented
260 sx AS (Approx)
930 sx AS Lite, 342 sx
'Gl
307 sx Class 'Gl
342 sx Class 'G'
measured Slotted Liner 10729' - 116551
true vertical Slotted Liner 8125' - 812T
Tubing (size, grade, and measured depth
Re-enter suspended well -
Time extension - Stimulate -
Variance - Perforate -
6. Datum elevation (DF or KB feet)
RKB 64.9 feet
7. Unit or Property name
Other -
Prudhoe Ba Unit
8. Well number
E-103
9. Permit number / approval number
201-2000
10. API number
50-029-23045-00
11. Field / Pool
Prudhoe Ba Field I Midni ht Sun Pool
Measured Depth
133'
4491'
True vertical Depth
133'
3784'
10270'
10129' - 11655'
Packers & SSSV (type & measured depth) 7-5/8" x 4-1/2" BKR S-3 PKR @ 10072' MD. 7-5/8" x 5-1/2" BKR ZXP PKR @ 1011T MD.
7-5/811 x 5-1/2" BKR HMC HGR @ 10123' MD. 5-1/2" x 4-1/2" XO @ 10129' MD.
Two BKR ECPs @ 10662' & 116791. 5-1/2" HES 'Xl Ni Ie @ 2174'.
13. Attachments Description summary of proposal _X Detailed operations program - BOP sketch -
14. Estimated date for commencing operation 15. Status of well classification as:
Janua 27,2002
16. If proposal was verbally approved
Oil_X
Name of approver Date approved Service
17. I hereby certify that the foregoing is t' e and correct to the best of my knowledge.
Signed
Jim Youn
Title: Midnight Sun Surveillance Engineer
Gas-
Suspended -
Questions? Call Jim Young @ 564-5754.
FOR COMMISSION USE ONLY
Conditions of approval: Notif Commission so representative may witness
Plug integrity - BOP Test - Location clearance - t../ 0 '-I
Mechanical Integrity Test - Subsequent form required 10- " .
Original Sìgned By
am
""') ~' W (~."" fi ~\ '. ~ 1\ ~
l .J' I' .
, ¡,..," \ Î """' " i,\, ì P ,
I. i \.. Ii t. J1 . ti \1: l""'1. I;
.....~"r\:".,..".,!I~I_~\¡¡-.,
Approved by order of the Commission
Form 1 0-403 Rev 06/15/88 .
Commissioner
Date
SUBMIT IN TRIPLICATE
Re: E-1P3 completion
(:
('
Subject: Re: E-103 completion
Date: Fri, 23 Nov 2001 08:56:56 -0900
From: Tom Maunder <tom_maunder@admin.state.ak.us>
To: "Smith, Phil G (FAIR)" <SmithPG1 @BP.com>
CC: "Wesley, Dave E" <WesleyDE@BP.com>
~Ð \ - ~
Phil and DAve,
Sorry I wasn't able to get back sooner.
the job.
Tom Maunder, PE
Sr. Petroleum Engineer
AOGCC
This proposal looks reasonable. Good luck with
"Smith, Phil G (FAIR)" wrote:
> Tom
,
> We've drilled down into the Miluveach on E-103 with Doyon 16, then 500' more
> until we came back up into the Kuparuk. We're about to plug off the
> non-productive last 500', then run a bonzai completion. 1'1/ fax you a
> diagram and enclose the procedure. 1'1/ be out of the office in about an
> hour, returning Dec 4th. Until then, Dave Wesley is the man.
>
> Happy Thanksgiving,
> Phil
>
> «E-103 Bonzai Liner.ZIP»
>
> ------------------------------------------------------------------------
>
>
>
Name: E-103 Bonzai Liner.ZIP
E-103 Bonzai Liner.ZIP Type: Zip Compressed Data (application/x-zip-compressed)
Encoding: base64
'---
Tom Maunder <tom maunder@admin.state.ak.us>
Sr. Petroleum Engineer
Alaska Oil and Gas Conservation Commission
--
1 of 1
11/23/01 8:57 AM
,'
~
{'
\
E-103
Drilling Program Revision
Plugback and Bonzai Liner
Job 9: Case J Cement Production Liner
The end of the horizontal section dips up near the gas-oil contact with no productive interval in the last 500'
of well bore. A plugback will be necessary prior to running the solid x slotted liner to keep gas from
encroaching from the end of the section. A sacrificial string of 3 %" tubing with an ECP packer with be left
in the end 500' to ensure the best possible plug placement. The revised slotted x solid liner program will
simplify the overall completion, improve productivity, and save money on E-103.
Hazards and Contingencies
)0> 2-7/8" PAC specified for post-bonzai cleanout: 8-135 wI 3.125" TJ OD, 1.50" TJ ID, 2.151" tube ID,
MU torque: 3400-3800 ft-Ibs /216K Ibs tensile. Modeling at the high end friction factor suggests
9000 ft-Ibs surface torque and 500 ft-Ibs at the 2-7/8" x 4 %" crossover when at PBTD. Check
torque prior to entering the liner with the mill. If torque is significantly higher, evaluate the
application of lubricant additions.
)0> 2-7/8" 8rd is the weak point of the abandonment string: 80% of max tensile is 116,000 Ibf.
)0> IMPORTANT: ELIMINATE THE XN NIPPLE from the completion. This well is a candidate for a
CT drillout and 3.813" minimum ID is required.
Reference RPs
.:. Combination Solid-Slotted Production Liners
Operational Specifics:
. POH, LD 6 %" drilling assembly.
. Perform weekly BO P test.
Abandon ment
. Make up the following 3 %" sacrificial string:
0 3 %" Guide shoe (round nose, no fins)
0 3 %" 9.2# L-80 18T (185'). 6 %" straight-blade centralizers place one every joint for the first
three joints in hole. Final three joints nearest ECP with 2 centralizers each joint.
0 4 %" Float collar
0 ECP abandonment assembly (::1:35' overall) 5 5/8" maximum OD, 2 7/8" 8rd Box up
0 XO to HT-38 4" DP
RIH such that the center of the ECP is located at 11,690' MD.
.
.
Circulate a minimum of 3 OH annulus volumes, RU cementing equipment and chart recorder.
Pump 5-bbls 2% KCL, test lines to 3500 psi.
Pump 10 bbls 15.8 ppg cement as per original production liner specifications.
Drop wiper plug, displace with 5 bbls 2% KCI, followed by drilling mud at maximum rate up to 1500
psi. Displace with rig pumps until plug bumps. If plug does not bump, continue circulation until all
cement returns, POH with liner.
.
.
.
E-103 Plugback and Bonzai Liner
Page 1 of2
('
.'1""
'I
~
.
Inflate ECP as per Baker representative's instructions. ECP begins inflation at 2000 psi. Hydraulic
release set for 3000 psi.
Release from abandonment string, CBU, note any cement returns, Spot a standard liner running pill
across the open hole section prior to POH.
.
Bonzai Liner
.
Refer to the RP for all operation and equipment specs not listed below.
Add 4 V2" landing collar one joint below the FC listed in the RP.
Spot a standard liner running pill across the open hole section prior to POH.
ECP setting depth at 10,650' MD (::!:20') with float shoe positioned :t10' from abandonment
string/plug.
Cement volume :t16-bbls (calculate based on open hole volume above the ECP +30% + liner lap).
Run 2 RH turbolators per 3 joints (non-slotted joints only) as specified in the original drilling
program. '
The liner cleanout previously detailed in another program addendum should be performed as per
the procedure listed in the Combination Solid-Slotted Production Liners RP.
.
.
.
.
.
.
; ~~
Approved By:
Drilling Engineer
Date
Senior Drilling Engineer
Date Drilling Superintendent
Date
E-103 Plugback and Bonzai Liner
Page 2 of2
11/21/2001 14:54 FAX 907 564 4040
TREE: 5-1/8" - SM CarDOn
WELLHEAD: 13 5/8' - SM mc SH
10-3/4", 45.5 #/ft, L-BO, BTC
I 4491" I
bp EXPLORATION
@OOI
\
I
E-103 Proposectl Completion
i
!
I
5-112" tubin~ hanger
Cellar Elevation ::: 30.4'
Doyor 14 RKB ::;; 64.9'
I 2200' I 5-1/2" 'X' Landing Nipple with 4.562" seal bore.
5-1/2" 17# 13Cr-BO VamTop Tubing
5-1/2" x 4-1/2" crossover spaced out one full joint above top GLM
4-1/2" Cameo Gas LIft Mandrels with handling pups Installed.
GAS LIFT MANDRELS
-
; # TVD I MD Size Valve
..--..---.--
1 4000' / ...4800' 1" RP ~:i
2 5800' /-7300' 1'1 D
3 I 7300' /-92501 1" 0
4 Two full joints 111 [)
above packer
\
Type
----_....._-_.~ - - ._m
hear
V
V
V
.J
4.1/211 12.6/l 13Cr-60 Vam Ace Tubing
4.1/2" 'X' Landing Nipple with 3.61311 seal bore.
7-5/8" x 4-1/2" Baker 'S-3' Production Packer
4-1/2" 'X' Landing Nipple with 3.613" seal bare.
4-1/2" WlreLine Entry Guide spaced-out into 4.1/211 liner tie-back sleev,e:.
110,079' I BAKER 5")( 7" Liner Tie Back Sleeve
ZXP Liner Top Packer
'HMC' Hydraulic LIner Hanger
7-5/B", 29.7 #Ift, LBO, BTC-Mod
Date
06/28/01
11/21/01
110,270'1
4-1/2/1 x 6-3/4" ECP I 10,650' I
4-1/2" Slotted LIner I 11.6551 I 6-3/4/1 OpEmhole l ::12~.1.QJ
-~~~~~~~-~~] ~L ~
3-1/2" Abandonment String I 11,894' l
Rev By
WSI
PGS
Comments
MIDNIGHT SUN
WELL: E..,103
API NO: 50..0:~9-23045
Proposed Completion
Proposed Completion with Bonzai Liner
.------.
Prudhoe Bay Unit
RECE
NOV 2 1 2001
Ä'aska OU & Ga.~ Coos' ~ommi~$Ot.
Anchoraf)€
f
~.
t(
~V&\VŒ (ffi~ &\~&\~[K\!A\ /
ALAS KA. 0 IL .AM) GAS /
CONSERVATION COMMISSION /
Brian Robertson
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage AK 99519-6612
TONY KNOWLES, GOVERNOR
333 W. 7TH AVENUE. SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Re:
Prudhoe Bay Unit E-1 03
BP Exploration (Alaska), Inc.
Permit No: 201-200
Sur Loc: 1586' SNL, 501' WEL, Sec. 06, T11N, R14E, UM
Btmho1e Loc. 291' SNL, 385' WEL, Sec. 36, T12N, R13E, UM
Dear Mr. Roberterson:
Enclosed is the approved application for permit to drill the above referenced well.
The permit to drill does not exempt you from obtaining additional pennits required by law from other
governmental agencies, and does not authorize conducting drilling operations until all other required
permitting detenninations are made.
In accordance with 20 AAC 25.005(t), all records, data and logs acquired for the pilot hole must be
clearly differentiated in both name (name on permit plus PH) and API number (50- - -70) from records,
data and logs acquired for well (name on pennit).
Annular disposal has not been requested as part of the Pennit to Drill application for Prudhoe Bay Unit E-
103. .
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient
notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a
test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission
petroleum field inspector on the North Slope pager at 659-3607.
Sincerely,
(~,~~/()4kL' ~
¿~;-~chsli Taylor
Chair
. BY ORDER OF THE COMMISSION
DATED thisJk1h day of October, 2001
jj clEnclosures
cc:
Department of Fish & Game, Habitat Section wlo encl.
Department of Environmental Conservation wlo encl.
" STATE OF ALASKA (
ALASKÁ -JL AND GAS CONSERVATION COM~".JSION
PERMIT TO DRILL
20 AAC 25.005
kLb ¡,
{þ
Hole
3011
13-1/211
9-7/811
6-3/411
1 b. Type of well 0 Exploratory ~Stratigraphic Test II Development Oil
0 Service 0 Development Gas ~ Si ¡ale Zone 0 Multiple Zone
5. Datum Elevation (DF or KB)' 10. Field and Pool
Planned RKB = 61.4' Prudhoe Bay Field / Midnight
6. ~rop,erty Designation Sun
() z.e~::>oq. I
óz..øz't'7 &. ADL 028277 j;iJ
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
E-103
9. Approximate spud date
10/25/01 Amount $200,000.00
14. Number of acres in property 15. Proposed depth (MD and TVD)
2560 12455' MD 18116' TVD
17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
0
90 Maximum surface 2400 psig, At total depth (TVD) 80211/ 3200 psig
Setting Depth
Ton Bottom
Lenath MD TVD MD TVD
80' Surface Surface 133' 133'
44561 Surface Surface 4485' 3780'
10315' Surface Surface 10344' 8031'
~ -.¡~ 8011' 12455' 8116'
';>ëHo \ ,'() \co. '-\
11. Type Bond (See 20 AAC 25.025)
1 a. Type of work II Drill 0 Redrill
0 Re-Entry 0 Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1586' SNL, 5011 WEL, SEC. 06, T11N, R14E, UM
At top of productive interval
17061 SNL, 4151' WEL, SEC. 31, T12N, R14E, UM
At total depth
2911 SNL, 3851 WEL, SEC. 36, T12N, R13E, UM
12. Distance to nearest property line 13. Distance to nearest well
ADL 028299, 3851 MD E-02A 321 away at 871' MD
16. To be completed for deviated wells
Kick Off Depth 300' MD Maximum Hole Angle
18. Casin9 Program Specifications
Size
Casino Weicht Grade Counlina
2011 91.5# H-40 WLD
10-3/411 45.5# L-80 BTCM
7-5/811 29.7# L-80 BTCM
4-1/211 12.6# L-80 BTCM
Number 2S100302630-277
Quantitv of Cement
(include staae data)
260 sx Arctic Set (Approx.
930 sx Arctic Set Lite. 342 sx lG'
307 sx Class lG'
342 sx Class lG'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
feet
feet
feet
feet
Junk (measured)
Plugs (measured)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
Size
Cemented
MD
TVD
RECEIVED
OCT 0 2 2001
Perforation depth: measured
true vertical
Alaska Oil & Gas Cons. Commission
Anchorage
II Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch II Drilling Program
II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Phil Smith, 564-4897 Prepared By Name/Number: Sandra Stewman, 564-4750
21. I hereby certify that the foregzil.f~reg 'fig is true aj)ð s.ç>rrect to the best of my ~nOwl~~ge .
Signed Brian Robertson IM--~A Ue.-- -' Title Senior Drilling Engineer Date Iö c- Q;) -' () l
, :,., , :"":: :::,,: "::',,:,:;'\':':::~::' :::",:",;',,/¡::",!:,::< :<:",:,Jç~:m~~s~i:Ørl::g$~:Ø¡"IY:::\::"::¡':.':/:i::,:'.::://':,:¡:;::::::::,::!,'::::"":":: :::':,.', :::..:;>:,', '
Permit Number, " API Nu.mber " t//-'"-' . ~prTova' Qate '\ See cover lett.er
20 t- 2öO 50- 029- 230 :::> - OC> 1('), (J) 10 I for other reQUIrements
Conditions of Approval: Samples Required 0 Yes t8I No Mud Log Required 0 Yes 1&1 No
Hydrogen Sulfide Measures 0 Yes ~ No Directional Survey Required iii ~, 0 No
Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K ,,3.5K psi~
OthE{Jriginal Signed By by order of
CammyJJe J1sli. Commissioner the commission
L' K j b I i\J A L
20. Attachments
Approved Bv
Form 10-401 Rev. 12-01-85
Date J ê) (I /) /rJl
Submit I rripliéate'
('
,(
IWell Name:
I E -1 03
Drill and Complete Plan Summary
l!ïPe of Well (service I producer I injectorLj HbttiOì1ta,"PtddÜcer
Surface Location: X = 664,480.00 Y = 5,975,477.00
Estimated 15861 FNL, 501' FEL Sec. 6, T11 N, R14E Umiat
Target Location: X = 660,698.64 Y = 5,980,556.00 TVDss 8055
Kuparuk "C" sands 1706'FNL,4151'FEL Sec. 31, T12N, R14E Umiat
Bottom Hole Location: X = 659,566.27 Y = 5,981,947.70 TVDss 8055
2911 FNL , 385' FEL Sec. 36, T12N, R13E Umiat
I AFE Number: 15M0509
I Estimated Start Date: 110/25/2001 I
1 MD: 112,455' 1 I TVD: 18116' I
~I Doyon 14
l.Qperatin~s to complete: 131.9
I BF/MS: 132.9' I
1 RKB: 161.4'
1 Well Desig~Jconventional, slim hole, etc.).J Slimhole Horizontal
~ective: I
Kuparuk Formation (LB - Sand, just overlying base Kuparuk)
Mud Program:
13 1/2" Surface Hole 0-4485' :
Initial
below -2000' MO
interval TO
Fresh Water Surface Hole Mud
API FL PH
mls/30min
15 - 20
<10
<10
8.5- 9.5
8.5- 9.5
8.5- 9.5
9 7/8" Intermediate I Pilot Hole (4485' - 11,104'): Fresh Water LSND
Interval Density Viscosity PV YP pH API HTHP
(ppg) (seconds) Fi Itrate Fi Itrate
Sutiace <10 by
shoe to 9.5 40 - 60 8 - 12 20 - 25 8 . 5-9 . 5 4-6 HRZ
HAZ
H RZ to 10.7 40 - 60 10 - 16 20 - 25 8.5 -9.5 3-5 <10
9- 7/8" TD
(10,344' MO)
6 3A" Pilot 9.0 40 - 60 5-8 20 - 25 8.5 -9.0 <6.0 NA
Hole
E-103
Page 1
f
(
6 3A" Production Hole 1 0,344' - 12,455'): 3% KCI Poh mer
Interval Density Viscosity PV YP pH API HTHP
'¡JIll I) (seconds) Fi Itrate Filtrate
\r .. ~
75/8" 8.6 50 - 60 8 - 12 20 - 25 8.5 -9.5 <10 NA
shoe to TD
(6 3A"
Horizontal)
Di rectional:
Ver. S er -Sun WP-05
KOP: 300'
Maximum Hole Angle:
Close Approach Wells:
I ntermed iate/Prod u ction
Hole
Pilot/Production Hole
90° from 10,662' MD - 12,455' MD
All wells pass major risk criteria. However, E-103 will pass
within less than 100' from three wells: E-02A = 31.7'center-
to-center at 871' MD; E-16 = 71.7' at 500' MD; and E-26A
at 61.5' at 1147'MD. A surlace gyro will be required to
a roximatel 1000' .
Drilling: MWD I GR
Open Hole: Gyro (SSDS Photo) (-1000' MD)
Cased Hole: None
Drilling: MWD/GR/P4Res/PWD/(Recorded
Neu/Den.)
Open Hole: None
Cased Hole: None
Drilling: MWD/GR/P4Res/PWDI (Recorded
Neu/Den.) + MAD Pass + cuttings sampling
Open Hole: Contingent CMR
Cased Hole: None
Formation M Dbkb TVDbkb Estimated pore pressure, PPG
Tops
Base Gubik 544 544
Base Permafrost 1942 1886
SV6 1997 1936
Mid-Eocene Unconf. 3142 2816
SV5 3320 2946
SV4 3647 3186
SV3 4308 3671 ... c.:. C'\
SV2 4567 3861 ,. """""',"-"'..:t. -- J ~
SV1 5091 4246
UG4 5671 4671
Top UGNU (UG4A) 5725 4711
E-103
Page 2
f
('
UG3 6073 4966
UG1 6713 5436
WS2J Schrader N 7538 6041
WS11 Schrader 0 7810 6241
Top Colville (CM3) 8001 6381
CM2 9746 7661
CM1ITHRZ 10157 7936
BHRZI Top Kalubik 10312 8016
Kuparuk UB 10322 8021 3200 psi (7.7 ppg) JI//l.- ~ .- \....... "'--
Kuparuk UA 10365 8041 - t" '0..;»
OGOC 10443 8071
Kuparuk LB 10508 8086
BKUPITMLV 10954 8126
TD Criteria 150' below Miluveach toD
Casin ITubin
Hole Casing! Conn Length Top Btm
Size Tb D.D. MD/TVD MD/TVD bkb
30" 20" 91.5# H-40 WLD 80' GL 133'/133'
13 Y2" 1 0 3/4" 45.5# L-80 BTCM 4456' GL 4485'/3780'
97/8" 7 5/811 29.7# L-80 BTCM 1 031 5' GL 10,344'/8031'
6 3,4" 4 Y2" 12.6# L-80 BTCM 2155' 1 0300'/8011 ',~ 'I,'. ,'/8116'
Tubin 5 Y2" 17.0# 13-Cr VamACE ....4700' GL 4700'/3959' .
Tubin 4 Y211 12.6# 13-C r VamACE ....5600' 4700' /3959' 10,300'/8011 '
Cement Calculations:
The following surface cement calculations are based upon a single stage job using a port collar as
contingency if cement is not circulated to surface.
Casin Size 10 3/4" Surface
Basis: Lead: Based on 1942' of annulus in the permafrost @ 350% excess and 1858' of open
hole from top of tail slurry to base permafrost @ 40% excess.
Lead TOC: To surface
Tail: Based on 500' TVD open hole volume + 40% excess + 80' shoe track volume.
Tail TOC: At -3800' MD 3300' TVDbkb .
Total Cement Volume: Lead 735 bbl 14127ft I 930 sks of Dowell ARTICSET Lite 3 at
10.7 and 4.44 cf/sk.
Tail 70 bbl I 393 ft / 342 sks of Dowell Premium 'G' at 15.8
and 1 .15 cf/sk.
Casin Size 7 5/8" Intermediate Casing
Basis: 500' MD above uppermost hydrocarbon interval (CM2, top 7600' TVDss)
Tail: TOC 9246' MD and 40% excess + 80' shoe volume
Total Cement Volume: Tail 63 bbls I 354 ft I 307 sks of Dowell Premium 'G' at 15.8
and 1 .15 cf/sk.
Casin Size 6 3,4" Pilot Hole
Basis: Full hole volume TD to 7-5/8" casing shoe (1 0,34~(\¡:,', .~.
E-103
Page 3
(
-(
Tail: Based on TOC at 7-5/8" shoe at 10,344' + 10% excess
Total Cement Volume: Tail 37 bbls I 208 ft I 181 sks of Dowell Premium 'G' at 15.8
and 1.15 cf/sk.
Casin Size 4 Y2" Production Liner
Basis: Tail: Fully cemented OH x casing annulus from 12,455 - 10,344' + 10% excess + 150'
liner la + 200 + DP x casin annulus + 80' shoe
Total Cement Volume: Tail 70 bbls I 393 ft I 342 sks of Dowell Premium 'G' at 15.8
and 1.15 cf/sk.
Well Control:
Surface hole will be drilled with diverter. The intermediate hole, well control equipment
consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer
will be installed and is capable of handling maximum potential surface pressures. Based upon
calculations below BOP equipment will be tested to 4000 psi
Diverter, BOPE and drilling fluid system schematics on file with the AOGCC.
Production Interval-
. Maximum anticipated BHP:
. Maximum surface pressure:
3200 psi @ 8021' TVDbkb - Kuparuk UB
2400 psi @ su rface
(based on BHP and a full column of gas from TO @ 0.10 psi/ft)
. Planned BOP test pressure:
. Planned completion fluid:
3500 psi
8.6 ppg filtered seawater I 7.0 ppg Diesel
Disposal:
. No annular injection in this well.
. Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind
and inject at DS-04.
. Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-
04 for injection. Haul all Class I wastes to Pad 3 for disposal.
E-103
Page 4
(
(
DRILL AND COMPLETE PROCEDURE SUMMARY
Pre-Rig Work:
The 20" conductor needs to be set.
1. Weld an FMC landing ring for the FMC Slimhole wellhead on the conductor.
2. If necessary, level the pad and prepare location for rig move.
3. Ensure any required plugs and I or well shut-ins have been accomplished in nearby wells for rig move
and close approach concerns.
Rig Operations:
1. MIRU Doyon 14.
2. Nipple up and function test diverter. PU 5" DP as required and stand back in derrick.
3. MU 13 1/2" drilling assembly with MWD/GR and directionally drill surface hole to approximately 4485'
MD I 3801' TVD. The actual surface hole TD will be +1-50' TVD below the top of the SV3 sands.
4. J\~¡ti:~~m8añÖ'~'cäm:Eb,t~:fhê;':':~(},.34f~~ì!i~~3i5iI;¡'ft)t1f;~:~::':$'~~ÇØ'i";~J$i'ng~';:~CkltQ!,:'Sl)~'rf~Ç~,.:'A,T AM Port collar or stage
tool will be run in the casing string to allow secondary cementing, in the event cement is not circulated
to surface during primary cementing operations.
5. ND diverter spool and NU casing I tubing head. NU BOPE and test to 3500 psi.
6. MU 9 7/8" drilling assembly with MWD/GR/Res/Neu/Den/PWD and RIH to float collar. Test the 10
,,;,:~tff'l'::x'~~ig~:,~l(¡>"R.R0P,~~i' fQr-~p 'l1;lir¡1u!es .
7. "Drillf1ew for'màtioh to 20' below 103/4" shoe and pa;tfófm::RørQ:1-e¡~j'O:I1,I~J~gri.~y Test.
8. Drill ahead to a depth of -25' md into the top of the Kuparuk.. ConditiOri hole" for casing run, as
needed, and POOH, laying down 5" drill pipe.
9. Run and cement the 7 5/8" production casing as required to cover all significant hydrocarbon intervals.
10. Freeze protect the 7 5/8" x 10 3/4" annulus as required.
11. PU sufficient 4" drill pipe and stand back.
12. MU 6 3,4" drilling assembly with MWD/GR/Res/Neu/Den/PWD and RIH to float collar. Tê~1¡tfîg¡!.7ili518":'~
Cas. im, g" '.,.t. cOla..5. ,1:\.,.". a." ,"$'i.s,i....',:~.r.,.,'.:a.. .¡¡..".'TA..'.. ¡i. f1b&,tes,.. ..¡I,i
!¡",c"..'L:"\'>i.,¡,;."""",.~I,_I,:'..""".":""':":\i,!,:":I...'"""",....",. .,
13. Drill neVI/fOrmation to 20' below 7 5/8" shoe and perform Formation Integr_l¡;[.§.§ti\1it~Q¡¡~"h~Ji""\!(ìiQ~liM,~"~.i~:'¡::;':;:~,,,,,~1,;.
Perform a 50% mud dilution to 9.1 ppg.
14. Drill ahead, following directional proposal, ~:I~\¡¡¡ij!Ð\j~t~'J~fØilillJllø~~"imately 11,105' MD, 8155'
TVD. Ensure adequate log coverage, and POOH for plug back.
15. There exists a contingency to run CMR log across Kuparuk, if heavy oil is identified.
16. RU Dowell and RIH with cementing stinger. Plug back pilot hole to 7 5/8" shoe.
17. RIH with 63,4" assembly. Dress cement, to s,hqe_,..drUI.out, and change over mud system to 8.6 ppg 3%
KCI Polymer drill-in fluid. !~!i,II"'horizontaf.produttion hole 'to TÐ'~:I:ÒP\]$:pp\~<;>~in.t~t~ly:;:~2';J4S5t\"Mi[);";;'fU1'6'
TVD, following rig site Geologists recommendation.
18. Condition hole for liner run, as needed, and POOH.
19. Run 4 Y2" liner to TD and cement, per program, back to the 7 5/8" shoe.
20. Perforate production interval via drill pipe conveyance
21. Run the 5 1/2" X 4 Y2", 13Cr-80 wI premium connections, gas lift completion assembly to the liner tie
back sleeve. Test the tubinglcasing annulus to 3500 psi and the tubing to 3500 psi.
22. Nipple down the BOPE. Nipple up and test the tree to 5000 psi.
23. Freeze protect the well to -2200' and secure the well.
24. Rig down and move off.
E-103
Page 5
('
(
E-103
Job 1: MIRU
Hazards and Contingencies
~ Standard Operating Procedures for H2S precautions should be followed at all times.
The highest level of H2S recently measured on E-pad was <50 ppm, (1999). The closest
wells to the surface hole location are E-02A and E-16, each measuring <10 ppm at last
testing, (2000). The closest wells to the bottom hole location are E-100 and E-1 01, each
measuring <10 ppm.
~ The closest surface locations are E-02A and E-16, 34' north and 66' south of well E-103,
respectively. Each are flowing with high gas-oil-ratio but are far enough away and pass risk
criteria such that no surface shut-in's will be required.
Job 2: Drilling Surface Hole
Hazards and Contingencies
~ No faults crossings are expected in the surface interval of E-103.
~ All wells pass major risk criteria. However, E-103 will pass within less than 100' from three wells:
E-02A = 31.7' center-to-center at 871' MD; E-16 = 71.7' at 500' MD; and E-26A at 61.5' at
1147' MD. Ar-'S9I!:faee:2§~fiG\:lwitbbe:reqiWir-ed,tßt,a¡!P-ÆP~im~t.~l~::l:Q,g:9::,~;¡i:::!bI~Y\e:,the"I;Photo~G¥r.G>i.o.r:;l:;,hand..,:s.:~.i".l'
~Si!a,;~ting:e~:{íii~tæ~vent~Jmäg:rteti~,;iQ~§J1:~~£~QPê.~ff~R~ê,-.Myxq;9i,reçt~p.1J.91~..".... . .
. '-".--.'.1.0..,.,.,.......,. ,."....,...,...."",.I,....,....,......,...I.".,........J.....",.....,,_.1.'-_...-..... "
~ The SV4 sand may contain gas hydrates, though little or none are expected. Hydrates will be
treated at surface with appropriate mud products.
Job 3: Install Surface Casina
Hazards and Contingencies
~ It is critical that cement is circulated to surface for well integrity. 350% excess cement through the
permafrost zone (and 40% excess below the permafrost) is planned. As a contingency, a 10 3/4"
TAM port collar will be positioned at :t1 OOO'MD to allow a secondary cement placement as
required.
,"",.. ""'0;" ".
,.....,.."..-....,. ,.. ,
.", "'"..,. '" ~" . , ,
; """',,~"n "
......""...""'~ """"""" ,n,. ;; , """"-" n. ",
Job 4: Drill Intermediate Hole
Hazards and Contingencies
~ The surface casing point is chosen just below the SV3 sands, leaving the SV1 exposed for the 9
7/8" hole. Differential sticking across the SV-1 sands has not been identified as a major issue,
though the potential exists.
~ See the pad data sheet for Ugnu coal seams. Coal seams have been problematic in this area
with respect to torque and connection gas.
~ KICK TOLERANCE: Tolerance is 212 BBLS at top of Kuparuk with a 12.0 ppg frac gradient at
the surface shoe, 10.7 ppg mud and reservoir pressure at 8.2 ppg (0.5 ppg more than anticipated)
and 100 psi surface safety factor.
~ E-103 will not cross any significant faults. The interval from CM2 to CM1 is also known as
Seabee (ARCO legacy) and Sierra Nevada (BP). This is a sandy shale and silty shale interval
which can develop stray, low porosity sandstones which may contain hydrocarbons or water. The
thick Colville shale section which is commonly developed between CM1 and BHRZ is mostly
truncated in this area, ranging from 35 to 110' thick.
~ The interval will TD just into the Kuparuk reservoir. The reservoir is expected to have been
depleted to 7.7 ppg EMW. The exposed section will be too short to pose a significant risk to
differential sticking, however, lost circulation should be anticipated. Follow the lost circulation
decision tree as required and double check LCM inventory prior to drilling into the Kuparuk
formation.
E-103
Page 6
{'
(
>- A contingent wireline I DP-conveyed CMR will be run only if heavy oil in cuttings samples is
detected, however this is unlikely.
Job 6: Case/Cement Intermediate Hole
Hazards and Contingencies
>- The two most significant offset wells, E-100 and E-1 01, experienced losses only while running and
cementing the longstring. It is quite possible that the loss zone is in the Ugnu I Schrader area
such as determined at S-pad. A casing running and cementing simulation will be performed
based on the results of 8-102 and design parameters will be provided afterwards to avoid lost
circulation.
>- The Ugnu and Schrader are expected to be wet. The lowermost hydrocarbon-bearing formation is
the CM2 overlying the HRl. This interval has a slim chance of containing significant
hydrocarbons, but is relatively close to top Kuparuk. For this reason the 7 5/8" casing is planned
to b9iGØ.i~~~~t:)V'eI!tR~~ß~2. The top of the hydrocarbon interval should be
verified with LWD resis ivity log. ~'~ ~~i\
Job 7: Drilling Production and Pilot Hole
Hazards and Contingencies
>- After drilling pilot hole, if the base Kuparuk is found shallower or if the GOC is found deeper than
expected, the horizontal section may be shortened andlor the target may be adjusted to a deeper
structural point -500' - 1000' east of the current target. Only a horizontal hole will provide the
production anticipated from this drainage, therefore there is no chance of completing the pilot
hole.
>- KICK TOLERANCE: after cementing the 7-5/8" casing in place, the kick tolerance becomes
infinite for the remainder of the well.
>- Due to an expected Kuparuk pressure of 3200 psi (7.7 ppg). Attention to possible lost circulation
and differential sticking is essential.
, .... ..,."""
". \
Job 9: Case & Cement Production Hole
Hazards and Contingencies
>- This is the first horizontal well in the Midnight Sun E-Pad development. Follow established
procedures for a standard fully-cemented liner. Success will be driven by proper pre-job planning
meetings and communication throughout the job.
~..~..'n"""""""""'.'.._n"""'~"""""""""'n"" "' ,.
'un. . '" ",""....."'" , ""
"""..,. \
""" ",."'"""'",,. I ,. \ """",m
".. ,,"". " .. ,.,."
Job 1 0: DPC Perforate
Hazards and Contingencies
>- The operation is planned with approximately 1500' of perforation at 500 psi underbalance which
may induce stuck pipe (guns). Upon running in hole with perf guns, observe the running
parameters to detect higher drag that may indicate cement stringers or debris left in the
production liner. POH with perf guns prior to perforating and make a clean out run if excessive
drag is evident.
>- Follow all service company rules and regulations while handling perf guns and ensure only the
necessary people are on the rig floor during make up and RIH.
>- Lost circulation after firing the guns and lor circulating to seawater is likely. If losses are
manageable, keep the hole full until the production packer is set. If losses are unacceptably high,
light grade LCM may be pumped.
,,; .. II",). .. ,.". "
;",.
.;.!
.AI. .L.."" . .!.J< ...u. .)\..\
E-103
Page 7
<'
('
Job 12: Run Completion
Hazards and Contingencies
~ The well will be completed with open perforations in the Kuparuk sand. Ensure proper hole fill at
all times.
Job 13: ND/NU/Release RiQ
Hazards and Contingencies
~ No hazards specific to this well have been identified for this phase of the well construction.
E-103
Page 8
TREE: 5-118" - 5M Carbon
WELLHEAD: 13 518" - 5M FMC SH
10-3/411,45.5 lIft, L-80, BTC
I 4485' I
7-5/811,29.7 lIft, L80, BTC-Mod
Date
06/28/01
Rev By
WSI
DEW
08/17/01
('
E-103 Proposed Completion
5-1/2" tubing hanger
Cellar Elevation = 30.4'
Doyon 14 RKB = 64.9'
I 2200' I 5-1/2" 'X' Landing Nipple with 4.562" seal bore.
5-1/2" 17# 13Cr-80 VamTop Tubing
5-1/2" X 4-1/2" crossover spaced out one full joint above top GLM
4-1/2" Cameo Gas Lift Mandrels with handling pups installed.
--------- -- -------------------------- ------ ---------------- ----------------- -
#
GAS LIFT MANDRELS
------------------------------------------------ ---- ------------- ----~-----------
TVD I MD Size Valve Type
----------------------------~----~--- -------------.-.-------.-------------- - ----------------------------------
1
2
3
4
4000' 1-4800'
5800' 1....7300'
7300' I ....9250'
Two full joints
above packer
1"
111
111
111
RP Shear
DV
DV
DV
----------- -----~----------------- -------------------~~ -----------------------------------
4-1/2" 12.6# 13Cr-80 Vam Ace Tubing
4-1/2" 'X' Landing Nipple with 3.813" seal bore.
7-5/8" x 4-1/2" Baker "S-3' Production Packer
4-1/2" "X' Landing Nipple with 3.813" seal bore.
4-1/2" 'XN' Landing Nipple with 3.813" seal bore and 3.725" No-Go 10.
4-1/2" WireLine Entry Guide spaced-out into 4-1/2" liner tie-back sleeve.
110,194' 1 BAKER 5" x 7" Liner Tie Back Sleeve
ZXP Liner Top Packer
'HMC' Hydraulic Liner Hanger
110,344'1
4-1/2" 12.6 lIft, L-80, BTC-Mod I
Plug Back Depth I
12,455' I
12,375' I
Comments
MIDNIGHT SUN
WELL: E-103
API NO: 50-029-?????
Proposed Completion
Proposed Completion based on Wp#5
BP Alaska Drilling & Wells
MW TVD Comments Midn ht Sun Wells
8.8 34 12-1/4" x 9-5/8" surface hole TO at 6370' MD. cemented
92 171 with 575 sacks Coidset lead / 585 sacks G tail. 315 bbls
92 319 first stage cement for surface, calculated 355 bbls. I 0
9.4 392 Opened DV at 2090' and had contaminated cement at
9.6 456 surface Immediately upon circulating.
9.6 456
9.6 456;¿¡cimpnt J.t:tllrnPfi for l1f)-hhl OëlllOP holp = 7S0% FXŒ';S I 1000
9.6 :;~~ 13.7 ppg lO~-----1
9.5 2000 ~ \11
9.5 5141 ¡-E-101 Mud Weight
9.5 5647 E-100 Mud Weight
9.5 5713 Pore
9.5 6180 MW TVD 319~1 I \ II
9.5 6429 Lost bottom section of FMI tool @ +/-6970' tvd. 8.3 Pore
9.6 7063 9 3000
9.6 7625 9.4 7925
10.0 7844 Ran 7230' of 7" casing in 8-3/4" hole in 6 hours with 7.7 7926
10.0 7844 some losses (2 min/it). Cemented with 49 bbls class G 7.7 10000
10.0 8183 with a total loss of 200 BBLs while RIH & cement'g. I 4000
10-0 8224
10.2 8215
102 8366 C
102 8366 Frac > 5000
I-
102 8366 MW TVD
10.4 8366 12.5 4000
10.4 8366 13 100001 6000
MW Comments
8.7 0 I I 7000
9.3 1530 Recip and circulated 9-5/8" surface casing in 12-1/4"
9.3 2733 hole. Cemented with 128 bbls lead, 68 bbls tail. Open
9.5 3688 stage collar at 2277' circ'd out contaminated mud.
9.8 Pumped 720 bbls cement to see returns at surface,
3688 followed by 166 to bump plug (720-166 bbls in annulus = I 8000
9.8 368 336% excess)
9.8 3688 12.5 ppglOT
9.4 4016;. Trip gas
9.5 4991 9000
9.7 5381 Wllogs hanging up at
9.8 6057 6150' tvd. Run DPC
9.9 6725
10.1 7530 10000
10.4 8152 lost 15 bph mud RIH first 34 joints (3 hrs '" 5.3 7.0 8.0 9.0 10.0 11.0 12.0 13.0
10.4 8401 min/jt). Continue losing RIH and cementing.
10.3 8414 290 bbls lost while RIH total. Continued losses
10.3 8887 while cementing. I Pressure (EMW ppg)
10.3 9098 14.8 ppg lOT after drill! out
10.5 9098
COMPANY DETAILS
BP Amoco
Calculalioo Method: Minimum Curvaturo
Error System: ISCWSA
&an Method: Tray Cylinder North
Error Sur/àœ: Ellipli<:al + C&ing
WamiDl Method: Ruks Based
A
REFERENCE INFORt..lATlON
C<HXdinate (N!£¡ Ref=nœ: Well CenIre: E-I03, Tm> Nonh
Verti<:al (TVD) Ref"""",,: Plan E-JO3 61.38' 6138
Se<:tioo (VS¡ Rel<:renœ: 5101 - (O-OON,O,OOE)
Measured Depth Ref"",nœ: Plan E-JO3 61.38' 61.38
Calculation Melbod: Minimum Curyature
SURVEY PROGRAM
Depth Fm Depth To SUlyeyPlan
61.38 1000,00 Planœd: E-JO3pb wp05 VI
1000,00 11I1J.I38 Planned: E-JO3pb wp05 VI
Plan: E-IfIJph wpO5 (E-IOJiPlan E-IOJ pilol hole)
Tool
Dale: 7/2M2001
Croaled By: Kal Allal
Checked:
Dale:
CB-GYRO-SS
MWD
Re\icwcd:
Dale:
WElL DETAILS
Name
-E/-W
laht",\:
5101
-N'-S
Eastiog
l.ffi8iludc
Nonhìog
597i>477.00
664480,00 7W2lT21.493N 148"39'i>4,902W
N'A
E-JO3 2273,67 1!I9O,90
TARGET DETAILS
Narœ TVD -N'-S 'E/.W No.>rthing 10000iog Shop"
E.1O3 pol¡-gon 812638 i>421.63 .3875,70 5980811.94 66048658 Pol)'soo
E-IOJ Pilot T::f,'" 812638 i>421.63 .3875.70 5980811.94 660186_<8 PoOOl
E.JO3 pol¡'gOD H 812638 i>421.63 -3875,70 5980811.94 66018658 PolyS""
E-IOJ Tla 811638 i>421.63 -3875,70 5980811.94 66048658 P"OOt
E.JO312 811638 657739 -4770,93 5981947,70 659"6627 (\'001
E.JO311 811638 5161.08 .366928 5980556,00 660698,64 P"lnl
SECTION DETAILS
ee MD Ine Azi TVD +N/-S +E/-W DLeg TFace VSec Target
~
61.38 0.00 0.00 61.38 0,00 0.00 0.00 0.00 0.00
300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00
700.00 4.00 270.00 699.68 0.00 -13.96 1.00 270.00 8.07
1117.94 10.00 324.88 1114.66 29.73 -49.47 2.00 77.70 52.86
1757.94 26.00 324.88 1721.36 190.97 -162.88 2.50 0.00 249.99
2012.32 26.00 324.88 1950,00 282.19 -227.03 0.00 0.00 361.50
2432.32 42.80 324.88 2295.31 475.58 -363.05 4.00 0.00 597.94
9832.44 42.80 324.88 7725.00 4588. 19 -3255.59 0.00 0.00 5625.86
10312.18 61.99 324.88 8016.38 4897.61 -3473.21 4.00 0.00 6004.15
10363.18 61.99 324.88 8040.33 4934.44 -3499.12 0.00 0.00 6049.18
10540.19 85.00 324.88 8090.28 5072.32 -3596.09 13.00 0.00 6217.75
10954.38 85.00 324.88 8126.38 5409.82 -3833.47 0.00 0.00 6630.36 E-1O3 Pilot Target Ii
3 111O4.38 73.00 324.88 8154.95 5530.04 -3918.02 8.00 180.00 6777.33
Start Dir 1°1100': 300' MD, 300'TVD
Base Gubik
Start Dir 2°11 00' : 700' MD, 699.68'TVD
150
300
:s
;:::
0
0
.,.,
~
..c
"E.
..
0
-a
u
'f
..
>
..
::J
....
E-
450
600
750
Start Dif 4°/100' : 2012.32' MD, 1950'TVD
End Dir : 2432.32' MD, 2295.31' TVD
ocene Uneonfonnity
FORMATION TOP DETAILS
No. TVDPath MDPath Formation
1 544.38 544.45 Base Gubik
2 1886.38 1941.53 Base Permafrost
3 1936.38 1997.16 SV6
4 2816.38 3142.49 Mid-Eocene Unconformity
5 2946.38 3319.66 SV5
6 3186.38 3646.76 SV4
7 3671.38 4307.77 SV3
8 3861.38 4566.72 SV2
9 4246.38 5091.43 SVI
10 4671.38 5670.66 UG4
II 4711.38 5725.18 UG4a
12 4966.38 6072.72 UGJ
13 5436.38 6713.28 UGI
14 6041.38 7537.84 WS2/Schrader N Sands
15 6241.38 7810.42 WSl/Schrader 0 Sands
16 6381.38 800 1.22 CM3
17 7661.38 9745.73 CM2
18 7936.38 10157.27 CMlrrHRZ
19 8016.38 10312.18 Base HRZ
20 8021.38 10322.83 Kuparuk UB
21 8041.38 10365.43 Kuparuk UA
22 8071.38 10443.44 GOC (original)
23 8086.38 10508.45 Kuparuk LB
24 8126.38 10954.38 BKUprrML V
CASING DETAILS
~o TVD MD Name-- ~Í2e-c---
-
I 3801.38 4484.94 103/4" 10.750
2 8031.38 10344.12 75/8" 7.625
3 8154.95 11104.38 Cemented 6 3/4" hole6.750
All TVD depths are
ssTVD plus 61.38' for RKBE.
~,---------,
CM2
// CMlrrHRZ
/' /- Base HRZ
/'/' /</ Kuparuk UB
/' / //,' Kuparuk UA
;/ // /./< OOC (original)
- _/ ",.','" /,-, /;'////", Kuparuk LB
. / ~<~/ BKUPrrML V
//~~p,/ Cemented 6 3/4" hole
L /
EndDir: 10312.18'MD,8016.38'TVD ~ I '\11000\------ TotalDepth: 1I104.38'MD,8154.95'TVD
- ------ ------- n__- -"Start DiflJhIlOor;-ru:f63:18'"MD;-SU2ffi:J3' I v U - - -7518-;;+- -"""'\,--- - Start Dir gollOO' : 10954.38' MD, 8126.38'TVD
__n______n______----------- _n_____- --. --~----_~_--__End Dir-=J0540.19' MD. 8090.28' TVD
900
0
, ,
Start Dir 4°11 00' : 9832.44' Ma, 7725'TVD
7500
1500
6000
3000
4500
Vertical Section at 324.68° [1500ft/in]
9000
12000
13500
10500
900
750
600
E
<:::
0
0
OJ) 450
~
+'
:;::
1::
0
~
:;::
'S
0
rn
300
150
COMPANY DETAILS
REFERENCE INFORMA nON
SURVEY PROGRAM
IRptb Fm Deplh To Sun'e)'iPIan
6138 1000,00 PIanœd E-IO3pb "-1'05 VI
1000-00 1110438 PIanœd E-IO3pb "]>05 VI
Plan: E-1O3ph wp05 (E.IOVl'lan 1:-103 pilol hole)
Crcaled By: Ken AlIl"" Dale: 7/26/2001
Tool
Bp Amoco
CakuJatioo Method: Minimum Cun~1Ure
Etror System: ISCWSA
S<:an Melbod: Tray C)1indor Nonh
Etror SurJãœ: EUipli<a1 ~ C3>-mg
Warni"" Method: Ru1es Based
C<HJn!inate (NIE) Reference: Well Centre: E.1O3, T"", Nonh
Vertical (TVD) Referenœ: Plan E-IO3 6138' 6138
Sectioo ('is) Relèrence: SIo< - (OJJON,O,OOE)
Measured Depth Reference: Plan E.1O3 6138' 613g
Calculation Method: Minimum Cun'3ture
Reviewed:
Dale: -
CB-GYRO-SS
MWD
Checked:
Dale:
"'Tn DETAII.S
Name -N'-S
Nonhi,,!!
5975477,00
Eo"",!!
1"'IUd:
'-"'gil"'" Sk.
-~'.W
E.1O3 2273,67 1990,90
664480.00 7if2/Y21.493N 148'39'~902W
NA
E.tsIin8 Shape
WJ.I8658 Poml
6GO48658 Polygon
TARGETDETAI'-S
Name
lVD
.E'.W
N."¡'¡ng
598œ11.94
598œll.94
-N'-S
E-1O3 Plio< Tatg"
E-1O3 polygon PH
812638 '-421.63 .3875,70
812638 '-421.63 .3875.70
------------
.---;;;--- '\
" ' '
'e;- 85~'~onf.
\, \<
SECTION DETAILS
ec MD Inc Azi TVD +N/-S +E/-W DLeg TFace VSec Targct
61.38 0.00 0.00 61.38 0.00 0,00 0,00 0,00 0.00
300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00
700.00 4.00 270.00 699.68 0.00 -13,96 1.00 270.00 8.07
I I 17.94 10.00 324.88 1114.66 29,73 -49.47 2.00 77.70 52,86
1757.94 26.00 324.88 1721.36 190,97 -162,88 2.50 0,00 249.99
2012.32 26.00 324.88 1950.00 282.19 -227.03 0.00 0,00 361.50
2432.32 42.80 324.88 2295.31 475.58 -363,05 4.00 0,00 597.94
9832,44 42,80 324.88 7725.00 4588.19 -3255,59 0.00 0.00 5625,86
10312.18 61.99 324.88 8016.38 4897,61 -3473.21 4.00 0.00 6004.15
10363.18 61.99 324.88 8040.33 4934.44 -3499,12 0.00 0.00 6049. I 8
10540.19 85.00 324.88 8090,28 5072.32 -3596.09 13.00 0.00 6217.75
10954.38 85.00 324.88 8126,38 5409.82 -3833.47 0.00 0,00 6630.36 E-I03 Pí1otTarget
3 11104.38 73.00 324.88 8154,95 5530,04 -3918.02 8.00 180.00 6777,33
-
CASING DETAILS
\ '- Total Depth: 11104.38' MD, 8154.95' TVD
"'-" \'/\ Start Dir 8°11 00' : 10954.38' MD, 8126.38'TVD
.,._,~, l\\'<
. - - ---E-JO3P.i1ot'fMget---,~, -",;',\ End Dir : 10540.19' MD, 8090.28' TVD
Cemented 6 3/4" hole'-" "" 'V Start Dir 13°1100': 10363.18' MD, 8O40.33'TVD
End Dir : 10312.18' MD, 8016.38' TVD
Start Dir 4°/100' : 9832,44' MD, 7725'TVD
All TVD depths are
ssTVD plus 61.38' for RKBE.
No. TVD MD Name Size
I 3801.38 4484.94 10314" 10,750
2 8031.38 10344.12 75/8" 7.625
3 8154.95 11104.38 Cemented 6 3/4" hole6.750
FORMATION TOP DETAILS
No. TVDPath MDPath Formation
I 544,38 544.45 Base Gubik
2 1886.38 1941.53 Base Permafrost
3 1936.38 1997.16 SV6
4 2816,38 3142.49 Mid-Eocene Unconformity
5 2946,38 3319.66 SV5
6 3186,38 3646.76 SV4
7 3671.38 4307.77 SV3
8 3861.38 4566,72 SV2
9 4246,38 5091.43 SVI
10 4671.38 5670,66 UG4
II 4711.38 5725.18 UG4a
12 4966,38 6072.72 um
13 5436.38 6713.28 UGI
14 6041.38 7537.84 WS2/Schrader N Sands
15 6241.38 7810.42 WSI/Schrader 0 Sands
16 6381.38 8001,22 CM3
17 7661.38 9745.73 CM2
18 7936.38 10157.27 CMlrrHRZ
19 8016.38 10312,18 Base HRZ
20 8021.38 10322.83 Kuparuk UB
21 8041.38 10365.43 Kuparuk UA
22 8071,38 10443.44 GOC (onginal)
23 8086.38 10508.45 Kuparuk LB
24 8126.38 10954.38 BKUprrMLV
-------- -
10 3/4"
End Dir : 2432.32' MD, 2295.31' TVD
/ Start Dir 4°1100' : 2012.32' MD, 1950'TVD
. End Dir : 1757,94' MD, 1721.36' TVD
~Start Dir 2.5°/100': 1117.94' MD, 1114.66'TVD
"" Start Dir 2°/100' : 700' MD, 699.68'TVD
Start Dir 1°/100' : 300' MD, 300'TVD
._-~- -----
------- _u_---
---.-------
-1500
West(-)fEast(+) [1500ftlinJ
0
1500
3000
__~___n
nn.u___-
-4500
-3000
~,'i
<:
BP Amoco
SSDS Surveys
,------ -----~---- ----~--- ------
-----------
-----------,
Company: BP Amoco Date: 7/26/2001 Time: 16:09:16
~ Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: E-103, True North
Site: PB E Pad Vertical (TVD) Reference: Plan E-103 61.38' 61.4
Well: E-103 Section (VS) Reference: Well (O.OON,0.OOE,324.68Azi)
, WeUpatb: Plan E-103 pilot hole Survey Calculation Method: Minimum Curvature Db: Oracle!
-- --~- ----~_.-.__.._--------------_. -------------- ---- - --.----- -----~---------------'------~--------------~-------'-'-'-----'--~-------- --------- --------------------------.._----_.J
- ---~----------_._.~-_._- -_._------_.._._------------------~.._---_._----_._-----------_._------------~--- ----------------.--- -.u..------ ------.
Survey: Start Date: '
Page:
1
Company:
I Tool:
Engineer:
Tied-to:
------ --,,-- H______~-- -. -
~----_u_--- _.._---~------------- -----__-_._m__~_~_._- ----~--- ..-.---._u.-..----
---------~ ---- -.
------~-- ------.-.----.--
I ----~--- ---_..---_._------------------
I Field: Prudhoe Bay
North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927
Goo Datum: NAD27 (Clarke 1866)
Sys Datum: Mean Sea Level
- -~ -_._--------~ -------~----.-------------- ----- --- ----.._..---_..._-------------------_._~ ___~n--_____--- - -.. --------- --..---- --
--- - -_._----~-------------- ---._------ .---- ---------_.~---_._----------_.._.._---- ----- --_n.--._.._---_..__._-----_._-----~---..---------~-------------------.------,,- ------- "-'_____n____U_- - - --- - -- -. -- -
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
BGGM2001
.------ .-.-----~-- - '.-----~----____-.n_-._._-------------------_._----_.- "-------"-----------~_. ___~_n_________n~..____---~_.__._---------_.._---- -..-..-----------------..----------
Well:
E-103
Slot Name:
Well Position: +N/-S 2273.67 ft Northing:
+E/-W 1990.90 ft Easting :
Position Uncertainty: 0.00 ft
5975477.00 ft
664480.00 ft
Latitude:
Longitude:
70 20 21.493 N
148 39 54.902 W
--..- ------'-".------ --..-...-- ----....__.._._~._--_._- -----------_...----_._....._---------.._--_.__..~-----~---_._----------_...-._----~.-_._~----------_._---------------------'-'-------""---______n__.._-
----__--"'_h ~_.----_..._------- -_. --- -_..
----.......--- ----------- ..~-_.._-- ----------.-..------.----....-----.--.----.------.------------------- -- ."--------""-___.__n___.__-------------..- -------_.._---_._---~_.._--_.._----~----._---. -. -.----.~---..-_. --.-- .---n_~._- -..--- .---------..----
Wellpath:
Plan E-103 pilot hole
Current Datum:
Magnetic Data:
Field Strength:
Vertical Section:
Drilled From: Well Ref. Point
Tie-on Depth: 0.00 ft
Plan E-103 61.38' Height 61.38 ft Above System Datum: Mean Sea Level
6/6/2001 Declination: 26.69 deg
57495 nT Mag Dip Angle: 80.82 deg
Depth From (TVD) +N/-S +E/-W Direction
ft ft ft deg
- - --..-- -_.-. - -.....- ---~~.....__.__._--- .-------.........-.--..-------..---- ----. -. --~--- --.- _..__.._----~-.------- .-. .-.--..-------.----..----.------.--.--.-----.--------------------------~------~~----_._- -.--.--.---.-------. ---..---
0.00 0.00 0.00 324.68
.- ---..---.----------.--.--.-.---..-....--------.----..-....- .
"----"'.'----"---.----------_u_...--.,-..--.-.-------...---- -.... ..-------------. - .._-----..-.-,,~-..-_.-..-.._--_.-.._-_.._---,,_..._----_._._.._. ....-_..-..-_. -_"_n"_____--,--------- - - ....
-.-___..__m_"_._.. -
Survey Program for Definitive Wellpath
Date: 6/6/2001 Validated: No
Actual From To Survey
ft ft
Version:
Toolcode
11
Tool Name
-- "-'-'--'---"- -----.----. ...._-_...__.._.__.~-- _..__._-----_..-.-..-..-._.---_.--.._-_._-_._-~_..._......_._---- ""--------"---"-'---------------"--------'---'_---__.m__..-~--------~------~--_._-..--_.__....----
--_..-._----- .--"--.-'------'----'-----'------',."_"__n___.__--.--..","_____n_._._....---.-.--- -"---"--"'."--------..----.-.-............-- --.---...-.----.-..-- -'-'-----"""--------_._---_.._.._~-_..._-_.._--.-..~..-.----_.__.._.._..--_.._.--..._.._-------_..._....._~.._---..-..._-------... "--m' -..--..-.-....-.--.-..-.. -..
Plan Section Information
..-' '~'è M1)\"'---~ 'i~ t f~~""".'" ~i~". . '--'-~~i\7Ji 7C"C""'-"'-~NI ~ S 7'~~7;E¡;W -'.~":~ "7-- ij ~~ ':~~~é'ij~ ûti }~-Pi~~--'~- ~-'- '1 Fe)"" -. -- '1 ~tg~ ~:~- ~~..~.... ,.. .~'"ëo~c-~"--; .':--....
.."..ft .deg'.." .dElg'. ..,' ..ft..., ",.."....ft.,. ,.' .""....,,"ft' ..,.~~gI10Pftg~gltOoftde~#1'O9ft:deg.."'", ", .:. ."..".." .",.'...".
,__0. -c.... .. --"C, c. .,.;.., .. c._......_.c;_.C_,~."'--c-_.c.. ---_.._.;..."-'-~---.. -,---"_c----,--,--~.-----,...;...;;..":"';:;.,c~". ...",,-~.-"-'.c, -... ~ -'-..-- '---"'C.......c.,,:,,-.c. ",-,-c_- ;-'-c..~.,-,_..-. _...C:-'_-..C~-,",;,.,,""-_.: -,,-,-,-,-,--c.c ""'L,----,c- C....-co_--..,....;..c.-.,..--.... .---"-,-"_""",,,,,;,_--
61.38 0.00 0.00 61.38 0.00 0,00 0.00 0.00 0.00 0.00
300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00
700.00 4.00 270,00 699.68 0.00 -13.96 1.00 1.00 0.00 270.00
1117.94 10.00 324.88 1114.66 29.73 -49.47 2.00 1.44 13.13 77.70
1757.94 26.00 324.88 1721.36 190.97 -162.88 2.50 2.50 0.00 0.00
2012.32 26.00 324.88 1950.00 282.19 -227.03 0.00 0.00 0.00 0.00
2432.32 42.80 324.88 2295.31 475.58 -363.05 4.00 4.00 0.00 0.00
9832.44 42.80 324.88 7725.00 4588.19 -3255.59 0.00 0.00 0.00 0.00
10312.18 61,99 324.88 8016.38 4897.61 -3473.21 4.00 4.00 0.00 0.00
10363.18 61.99 324.88 8040.33 4934.44 -3499.12 0.00 0.00 0.00 0.00
10540.19 85.00 324.88 8090.28 5072.32 -3596.09 13.00 13.00 0.00 0.00
10954.38 85.00 324.88 8126.38 5409.82 -3833.47 0.00 0.00 0.00 0.00 E-103 Pilot Target
11104.38 73.00 324.88 8154.95 5530.04 -3918.02 8.00 -8.00 0.00 180.00
----..-- .-. -'-..-'------.'-"-,, -----.--.... -_....~-.- -.---.-.-.... '---'--".---0-_-_._-...--..---..-----..--- ..._-_....~ -----....---..--.----.----.--------..- ------'-'.-------------'-.-----0'..---_--0-___",,--,--,,------------ ._..__._._--_...._--------_._~_..._---------~----------- .
Annotation
MD .TVD
ft ft ",. ..
-.- ..- -.-......--.--. --~-~.__._-,..~._--- --.-. .--...---.'-'-__....L ~_.._-,,-.:_~---':..-':':_-_._.._...... ...-.--......:.... ~._._-,-o_-,-.,-~,._,,---, ~_':'~.._--~--_.__._.c.._...__. -...-- ""'_0_"'--'__":"'---'. - .-....---..-...:-:-:- -- ..-_0__- ---
300.00 300.00 Start Dir 1°/100' : 300' MD, 300'TVD
700.00 699.68 Start Dir 2°/100' : 700' MD, 699.68'TVD
1117.94 1114.66 Start Dir2.5°/100': 1117.94' MD, 1114.66'TVD
1757.94 1721.36 End Dir : 1757.94' MD, 1721.36' TVD
2012.32 1950.00 Start Dir 4°/100' : 2012.32' MD, 1950'TVD
2432.32 2295.31 End Dir : 2432.32' MD, 2295.31' TVD
9832.44 7725.00 Start Dir 4°/100' : 9832.44' MD, 7725'TVD
10312.18 8016.38 End Dir : 10312.18' MD, 8016.38' TVD
10363.18 8040.33 Start Dir 13°/100': 10363.18' MD, 8040.33'TVD
10540.19 8090.28 End Dir : 10540.19' MD, 8090.28' TVD
10954.38 8126.38 Start Dir 8°/100' : 10954.38' MD, 8126.38'TVD
11104.37 8154.95 Total Depth: 11104.38' MD, 8154.95'TVD
'------ ----.-----.----...--------..-.----- -----..---.---...-- ---.- ..- ...--.-.-.-.---. ..- --.-.... -- - ---.- -...--... -.---' --.--_..-..
. .,. '"
..-----_...... .-.-..--.._-.. "---"---"'------.---- '~--"-""-'--'---"-'-'------'---'-------"-,-----,---,---.----..-----... ------'-"'.'--'---_._"--'-'---'-----~------'--"--'-----_.._-_.~---_._-_...-...._..._-_..... -.---------- n_-.... -- -... .._--..--_. -~._._~ '--'--____'_m'_'- --m-m' -----..--.-..,,- -...
,
~,
~..
BP Amoco
SSDS Surveys
{"
(,
- - -.- -- .. - 1
Company: BP Amoco Date: 7/26/2001 Time: 16:09:16 Page: 2 i
Field: Prudhoe Bay Co-ordiDate(NE) Reference: Well: E-103, True North I
! Site: PB E Pad Vertical (fVD) Reference: Plan E-103 61.38' 61.4 I
",
:- ._;;;~a~~__~i~~-1~~~~!_'?t h_~I~_____---_._~---------------;;;-[~~:;;::;~~~=---;~~~~~~~;r~;~~~~~b: ----~~~:_- .------_!
Survey
--~----
.-------------.
MD locI Azim TVD Sys TVD NIS E/W
ft deg deg ft ft ft ft
. .-.--.--.-. ----~--~-------------.------..- ----.--'----------'---- -----
, 61.38 0.00 0.00 61.38 0.00 0.00 0.00
100.00 0.00 0.00 100.00 38.62 0.00 0.00
200.00 0.00 0.00 200.00 138.62 0.00 0.00
300.00 0.00 0.00 300.00 238.62 0.00 0.00
400.00 1.00 270.00 399.99 338.61 0.00 -0.87
---------- -------------~-----------l
MapN MapE DLS VS I
ft ft deg/1 00ft ft ¡
I
5975477.00 . 66¡¡80.0Õ---Õ~Õo-------õ.OÕ-----'---1
5975477.00 664480.00 0.00 0.00 I
5975477.00 664480.00 0.00 0.00 I
5975477.00 664480.00 0.00 0.00
5975476.98 664479.13 1.00 0.50
500.00
600.00
700.00
800.00
900.00
1000.00
1100.00
1117.94
1200.00
1300.00
1400.00
1500.00
1600.00
1700.00
1757.94
1800.00
1900.00
2000.00
2012.32
2100.00
2200.00
2300.00
2400.00
2432.32
2500.00
2600.00
2700.00
2800.00
2900.00
3000.00
3100.00
3200.00
3300.00
3400.00
3500.00
3600.00
3700.00
3800.00
3900.00
4000.00
4100.00
4200.00
4300.00
4400.00
4500,00
4600.00
4700.00
4800.00
2.00 270.00
3.00 270.00
4.00 270.00
4.84 293.85
6.23 308.92
7.88 318.11
9.67 324.04
10.00 324.88
12.05 324.88
14.55 324.88
17.05 324.88
19.55 324.88
22.05 324.88
24.55 324.88
26.00 324.88
26.00 324.88
26.00 324.88
26.00 324.88
26.00 324.88
29.51 324.88
33.51 324.88
37.51 324.88
41.51 324.88
42.80 324.88
42.80 324.88
42.80 324.88
42.80 324.88
42.80 324.88
42.80 324.88
42.80 324.88
42.80 324.88
42.80 324.88
42.80 324.88
42.80 324.88
42.80 324.88
42.80 324.88
42.80 324.88
42.80 324.88
42.80 324.88
42.80 324.88
42.80 324.88
42.80 324.88
42.80 324.88
42.80 324.88
42.80 324.88
42.80 324.88
42.80 324.88
42.80 324.88
499.96
599.86
699.68
799.39
898.93
998.17
1097.00
1114.66
1195.20
1292.51
1388.72
1483.66
1577.13
1668.97
1721.36
1759.16
1849.04
1938.92
1950.00
2027.58
2112.82
2194.21
2271.35
2295.31
2344.97
2418.34
2491.71
2565,09
2638.46
2711.83
2785.21
2858.58
2931.95
3005.33
3078.70
3152.07
3225.44
3298.82
3372.19
3445.56
3518.94
3592.31
3665.68
3739.06
3812.43
3885.80
3959.17
4032.55
438.58
538.48
638.30
738.01
837.55
936.79
1035.62
1053.28
1133.82
1231.13
1327.34
1422.28
1515.75
1607.59
1659.98
1697.78
1787.66
1877.54
1888.62
1966.20
2051.44
2132.83
2209.97
2233.93
2283.59
2356.96
2430.33
2503.71
2577.08
2650.45
2723.83
2797.20
2870.57
2943,95
3017.32
3090.69
3164.06
3237.44
3310.81
3384.18
3457.56
3530.93
3604.30
3677.68
3751.05
3824.42
3897.79
3971.17
0.00
0.00
0.00
1.71
6.82
15.33
27.24
29.73
42.57
61.38
83.66
109.34
138.38
170.74
190.97
206.05
241.91
277.76
282.19
315.58
358.32
405.82
457.84
475.58
513.19
568.77
624.34
679.92
735.49
791.07
846.64
902.22
957.79
1013.37
1068.94
1124.52
1180.09
1235.67
1291.24
1346.82
1402.39
1457.97
1513.54
1569.11
1624.69
1680.26
1735.84
1791.41
-3.49
-7.85
-13.96
-21.31
-29.38
-38.18
-47.70
-49.47
-58.50
-71.73
-87.40
-105.46
-125.89
-148.64
-162.88
-173.49
-198.71
-223.93
-227.03
-250.52
-280.57
-313.98
-350.57
-363.05
-389.50
-428.59
-467.68
-506.77
-545.86
-584.94
-624.03
-663.12
-702.21
-741.29
-780.38
-819.47
-858.56
-897.64
-936.73
-975.82
-1014.91
-1053.99
-1093.08
-1132.17
-1171.26
-1210.34
-1249.43
-1288.52
5975476.92
5975476.83
5975476,69
5975478.24
5975483.17
5975491.49
5975503.19
5975505.64
5975518.27
5975536.79
5975558.71
5975583.99
5975612.58
5975644.42
5975664.34
5975679.18
5975714.47
5975749.77
5975754.12
5975786.99
5975829.05
5975875.80
5975927.01
5975944.47
5975981.49
5976036.19
5976090.89
5976145.59
5976200.29
5976254.99
5976309.69
5976364.39
5976419.09
5976473.79
5976528.49
5976583.19
5976637.89
5976692.59
5976747.29
5976801.99
5976856.69
5976911.39
5976966.09
5977020.79
5977075.49
5977130.19
5977184.89
5977239.59
664476.51
664472.15
664466.04
664458.66
664450.48
664441.49
664431.72
664429.89
664420.59
664406.94
664390.79
664372.17
664351.11
664327.66
664312.98
664302.05
664276.05
664250.05
664246.85
664222.64
664191.65
664157.21
664119.49
664106.63
664079.36
664039.06
663998.77
663958.48
663918.18
663877 .89
663837.59
663797.30
663757.00
663716.71
663676.41
663636.12
663595.82
663555.53
663515.24
663474.94
663434.65
663394.35
663354.06
663313.76
663273.47
663233.17
663192.88
663152.58
1.00
1.00
1.00
2.00
2.00
2.02
4.54
8.07
13.71
22.55
34.59
49.80
52.86
68.55
91.56
2.00
2.00
2.00
2.50
2.50
2.50
2.50
2.50
2.50
2.50
118.78
150.18
185.69
225.25
249.99
268.42
312.26
356.10
361.50
402.33
0.00
0.00
0.00
0.00
4.00
4.00
4.00
4.00
4.00
0.00
454.58
512.65
576.25
597.94
643.92
0.00
0.00
0.00
0.00
0.00
711.86
779.81
847.75
915.70
983.64
1051.58
1119.53
1187.47
1255.41
1323.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1391.30
1459.25
1527.19
1595.13
1663.08
1731.02
1798.96
1866.91
1934.85
2002.80
0.00
0.00
0.00
2070.74
2138.68
2206.63
1_-- .. ---.- ---...--..-----...-... .-....-.--- --.- .----..- --...-.- ----- - - .._.~--_._._- .-..-- -....-------.-... -_._-- -'--'--'---"--'---."'-'-- -----~-- ------.-.-..-...-..-.----.--- ----~.-----._~------ ..--..---.-... -- ---~--_. ----_.~--_._._-_._-----
(; ~'
BP Amoco
SSDS Surveys
------._------~--- --,
Company: BP Amoco Date: 7/2612001 Time: 16:09:16 Page: 3 !
~ Field: Pl'\Jdhoe Bay Co-ørdlnate(NE) Reference: Well: E-103, Tl'\Je North
Site: PB E Pad Vertical (fVD) Reference: Plan E-103 61.38' 61.4
, Well: E-103 Section (VS) Reference: Well (O.ooN,O.00E.324.68Azi)
: - ~~~~a~~ -- ~~~~~:~-~~-~-~()-~ h~~__~_--------------_._----_._---- ------~_~~~_~al~ull!.~!.~_~~~_od: -----~~~~':'1uf'!1.5~u~a~~! ------- -~~.=.___~~~I=-__. ----- i
Survey
c- --- .------ ------- ---,- ------ ---- --------~---- - -------- ------- - -----_._-~------------- -----¡
, MD Incl Azim TVD Sys TVD NIS EIW MapN MapE DLS VS I
...- -----~-------______deg --- d~~____-_._-~---------_..._------~_._-----_!t__._--~ ft ~--~-----_!!.._-____~eg/~ OOft__...!!_--------_J
4900.00 42.80 324.88 4105.92 4044.54 1846.99 -1327.61 5977294.30 663112.29 0.00 2274.57 I
~
5000.00 42.80 324.88 4179.29 4117.91 1902.56 -1366.70 5977349.00 663071.99 0.00 2342.51
5100.00 42.80 324.88 4252.67 4191.29 1958.14 -1405.78 5977403.70 663031.70 0.00 2410.46
5200.00 42.80 324.88 4326.04 4264.66 2013.71 -1444.87 5977458.40 662991.41 0.00 2478.40
5300.00 42.80 324.88 4399.41 4338.03 2069.29 -1483.96 5977513.10 662951.11 0.00 2546.35
5400.00 42.80 324.88 4472.79 4411.41 2124.86 -1523.05 5977567.80 662910.82 0.00 2614.29
5500.00 42.80 324.88 4546.16 4484.78 2180.44 -1562.13 5977622.50 662870.52 0.00 2682.23
5600.00 42.80 324.88 4619.53 4558.15 2236.01 -1601.22 5977677 .20 662830.23 0.00 2750.18
5700.00 42.80 324.88 4692.90 4631.52 2291.59 -1640.31 5977731.90 662789.93 0.00 2818.12
5800.00 42.80 324.88 4766.28 4704.90 2347.16 -1679.40 5977786.60 662749.64 0.00 2886.06
5900.00 42.80 324.88 4839.65 4778.27 2402.74 -1718.48 5977841.30 662709.34 0.00 2954.01
6000.00 42.80 324.88 4913.02 4851.64 2458.31 -1757.57 5977896.00 662669.05 0.00 3021.95
6100.00 42.80 324.88 4986.40 4925.02 2513.89 -1796.66 5977950.70 662628.75 0.00 3089.89
6200.00 42.80 324.88 5059.77 4998.39 2569.46 -1835.75 5978005.40 662588.46 0.00 3157.84
6300.00 42.80 324.88 5133.14 5071.76 2625.04 -1874.83 5978060.1 0 662548.17 0.00 3225.78
6400.00 42.80 324.88 5206.52 5145.14 2680.61 -1913.92 5978114.80 662507.87 0.00 3293.73
6500.00 42.80 324.88 5279.89 5218.51 2736.19 -1953.01 5978169.50 662467.58 0.00 3361.67
6600.00 42.80 324.88 5353.26 5291.88 2791.76 -1992.10 5978224.20 662427.28 0.00 3429.61
6700.00 42.80 324.88 5426.63 5365.25 2847.34 -2031.19 5978278.90 662386.99 0.00 3497.56
6800.00 42.80 324.88 5500.01 5438.63 2902.91 -2070.27 5978333.60 662346.69 0.00 3565.50
6900.00 42.80 324.88 5573.38 5512.00 2958.49 -2109.36 5978388.30 662306.40 0.00 3633.44
7000.00 42.80 324.88 5646.75 5585.37 3014.06 -2148.45 5978443.00 662266.10 0.00 3701.39
7100.00 42.80 324.88 5720.13 5658.75 3069.64 -2187.54 5978497.70 662225.81 0.00 3769.33
7200.00 42.80 324.88 5793.50 5732.12 3125.21 -2226.62 5978552.40 662185.51 0.00 3837.28
7300.00 42.80 324.88 5866.87 5805.49 3180.78 -2265.71 5978607.10 662145.22 0.00 3905.22
7400.00 42.80 324.88 5940.25 5878.87 3236.36 -2304.80 5978661.80 662104.93 0.00 3973.16
7500.00 42.80 324.88 6013.62 5952.24 3291.93 -2343.89 5978716.50 662064.63 0.00 4041.11
7600.00 42.80 324.88 6086.99 6025.61 3347.51 -2382.97 5978771.20 662024.34 0.00 4109.05
7700.00 42.80 324.88 6160.36 6098.98 3403.08 -2422.06 5978825.90 661984.04 0.00 4176.99
7800.00 42.80 324.88 6233.74 6172.36 3458.66 -2461.15 5978880.60 661943.75 0.00 4244.94
7900.00 42.80 324.88 6307.11 6245.73 3514.23 -2500.24 5978935.30 661903.45 0.00 4312.88
8000.00 42.80 324.88 6380.48 6319.10 3569.81 -2539.32 5978990.00 661863.16 0.00 4380.83
8100.00 42.80 324.88 6453.86 6392.48 3625.38 -2578.41 5979044.70 661822.86 0.00 4448.77
8200.00 42.80 324.88 6527.23 6465.85 3680.96 -2617.50 5979099.40 661782.57 0.00 4516.71
8300.00 42.80 324.88 6600.60 6539.22 3736.53 -2656.59 5979154.10 661742.27 0.00 4584.66
8400.00 42.80 324.88 6673.98 6612.60 3792.11 -2695.68 5979208.80 661701.98 0.00 4652.60
8500.00 42.80 324.88 6747.35 6685.97 3847.68 -2734.76 5979263.50 661661.69 0.00 4720.54
8600.00 42.80 324.88 6820.72 6759.34 3903.26 -2773.85 5979318.20 661621.39 0.00 4788.49
8700.00 42.80 324.88 6894.09 6832.71 3958.83 -2812.94 5979372.90 661581.10 0.00 4856.43
8800.00 42.80 324.88 6967.47 6906.09 4014.41 -2852.03 5979427.60 661540.80 0.00 4924.38
8900.00 42.80 324.88 7040.84 6979.46 4069.98 -2891.11 5979482.30 661500.51 0.00 4992.32
9000.00 42.80 324.88 7114.21 7052.83 4125.56 -2930.20 5979537.00 661460.21 0.00 5060.26
9100.00 42.80 324.88 7187.59 7126.21 4181.13 -2969.29 5979591.70 661419.92 0.00 5128.21
9200.00 42.80 324.88 7260.96 7199.58 4236.71 -3008.38 5979646.40 661379.62 0.00 5196.15
9300.00 42.80 324.88 7334.33 7272.95 4292.28 -3047.46 5979701.10 661339.33 0.00 5264.09
9400.00 42.80 324.88 7407.70 7346.32 4347.86 -3086.55 5979755.80 661299.03 0.00 5332.04
9500.00 42.80 324.88 7481.08 7419.70 4403.43 -3125.64 5979810.50 661258.74 0.00 5399.98
9600.00 42.80 324.88 7554.45 7493.07 4459.01 -3164.73 5979865.20 661218.44 0.00 5467.93
9700.00 42.80 324.88 7627.82 7566.44 4514.58 -3203.81 5979919.91 661178.15 0.00 5535.87
9800.00 42.80 324.88 7701.20 7639.82 4570.16 -3242.90 5979974.61 661137.86 0.00 5603.81
9832.44 42.80 324.88 7725.00 7663.62 4588.19 -3255.59 5979992.36 661124.78 0.00 5625.86
9900.00 45.50 324.88 7773.4 7 7712.09 4626.68 -3282.66 5980030.24 661096.87 4.00 5672.92
-. ,.. _n'___~_,-,,-.,---,,- ---.-..----,,-. '-----'.----.----. ------...-.---.------....-... --.----------------.- -'------~-'-~----~_.___.n..- ._----~--------_._------
(
BP Amoco
SSDS Surveys
('
- - - -
-..- - ---
Company: BP Amoco Date: 7126/2001 Time: 16:09:16 Page: 4
I Field: Prudhoe Bay Co-orclinate(NE) Reference: Well: E-103, True North
Site: PB E Pad Vertical (TVD) Reference: Plan E-1O3 61.38' 61.4
Well: E-103 Section (VS) Reference: Well (O.ooN,O.00E.324.68Azi)
~. WeU~a~~ Pla~_~-=-~~~-~~~_~~~I_~____-----------------------------_.._-______2urv..!~ C~lcu~~!~- Me~~~____~ini_,!,um g-~~~_t~'!_------ ---- J?~~- _C?~~~I!_____--- .
Survey
------------------------ ---- ----------,
MD loci Azim TVD Sys TVD NIS E/W MapN MapE DLS VS i
ft deg deg ft ft ft ft ft ft deg/1 000 ft
- ------ --~-------------- - -------..--- -- - --- ------ -------- - --- ------ -------- ---~----------------- ---------~-----~ -------- ._-,
10000.00 49.50 324.88 7841.01 7779.63 4686.97 -3325.07 5980089.59 661053.15 4.00 5746.63 I
10100.00 53.50 324.88 7903.25 7841.87 4750.98 -3370.08 5980152.58 661006.75 4.00 5824.88
10200.00 57.50 324.88 7959.87 7898.49 4818.37 -3417.49 5980218.92 660957.88 4.00 5907.28
10300.00 61.50 324.88 8010.61 7949.23 4888.84 -3467.05 5980288.27 660906.79 4.00 5993.42
10312.18 61.99 324.88 8016.38 7955.00 4897.61 -3473.21 5980296.91 660900.44 4.00 6004.15
10363.18 61.99 324.88 8040.33 7978.95 4934.44 -3499.12 5980333.16 660873.73 0.00 6049.18
10375.00 63.53 324.88 8045.74 7984.36 4943.04 -3505.17 5980341.62 660867.49 13,00 6059.68
10400.00 66.78 324.88 8056.24 7994.86 4961.59 -3518.21 5980359.88 660854.04 13.00 6082.37
10425.00 70.03 324.88 8065.45 8004.07 4980.60 -3531.59 5980378.59 660840.26 13.00 6105.61
10450.00 73.28 324.88 8073.31 8011.93 5000.01 -3545.23 5980397.69 660826.19 13.00 6129.33
10475.00 76.53 324.88 8079.83 8018.45 5019.75 -3559.12 5980417.12 660811.88 13.00 6153.47
10500.00 79.78 324.88 8084.96 8023.58 5039.76 -3573.19 5980436.82 660797.37 13.00 6177.93
10525.00 83.03 324.88 8088.70 8027.32 5059.97 -3587.41 5980456.71 660782.71 13.00 6202.65
10540.19 85.00 324.88 8090.28 8028.90 5072.32 -3596.09 5980468.87 660773.76 12.99 6217.74
10600.00 85.00 324.88 8095.49 8034.11 5121.06 -3630.37 5980516.84 660738.43 0.00 6277.32
10700.00 85.00 324.88 8104.21 8042.83 5202.54 -3687.68 5980597.04 660679.35 0.00 6376.94
10800.00 85.00 324.88 8112.92 8051.54 5284.02 -3744.99 5980677.24 660620.27 0.00 6476.56
10900.00 85.00 324.88 8121.64 8060.26 5365.51 -3802.30 5980757.44 660561.19 0.00 6576.18
10954.38 85.00 324.88 8126.38 8065.00 5409.82 -3833.47 5980801.06 660529.05 0.00 6630.36
11000.00 81.35 324.88 8131.80 8070.42 5446.86 -3859.52 5980837.52 660502.19 8.00 6675.65
11050.00 77.35 324.88 8141.04 8079.66 5487.05 -3887.79 5980877.07 660473.06 8.00 6724.78
11104.38 73.00 324.88 8154.95 8093.57 5530.04 -3918.02 5980919.38 660441.89 8.00 6777.33
--_P--_.._-----_..~---_._._-_..._-_._------_._._._.~ . ~--_._~-_.- ...---------.-. --------------------------~--------------------_... --- ---------.- --"----- -_.__._-----.._-------~--~-----------_._-------_._---- ----~._-~-_._-- ---.--.--.-.-.--------- ---.-.. _._.._...-~~--_..
6000
6500-
7000~
:s
4è
'"
~
.c
15-
8
7500-
~
;;
v
~
i:
8000--
8500--
9000
No. TVDPalÍ1
MDPath
FORMATION TOP DETAiLS
Formation
8041.38 10365.42
8071.38 10433.72
8086.38 10476.08
Dir: 10662..JI'MD,81 16.38' TVD
SlarlDir3i100': 10862.31'MD.8116.38'TVD
11500
E-I03 (Plan E-I03 pilot hole)
Sta¡i Dir 10/100': 10382.21' MD. 8049.27'TVD
AllTVD
ssTVD plus
5000
5500
6000
6500
7000
N"",
See MD Ine Azi
I 10363.18 61.99
2 10382.21 61.99
3 10662.31 90.00 324.88
4 10862.3 I 90.00 32488
5 10980.85 90.00 321.32
6 12454.86 90.00 321.32
12000
Verlical Section at 324.68' ¡500n!in]
J'1"n¡'~¡UJwJ'u\n:.¡oJ!P¡,m
By K".Alb.
CU,"',d
,lnD
D",'
¡("¡",,d
D,H"
NoHUm,
I,,"ook
",,'
1990.90
","'000
¡O"202149JN
i A"GET DETAILS
Noobmg
Simp"
SECTION DETAILS
TVD +N/-S iE/-W DLeg TFace VSec Target
8040.33 -3499.12 0.00 0.00 6049.17
8049.27 -3508.78 0.00 0.00 6065.97
8116.38 5168.27 -3663.58 10.00 0.00 6335.05
8116.38 5331.86 -3778.64 0.00 0.00 6535.05
8116.38 5426.64 -3849.79 3.00 -90.00 6653.52
81 16.38 6577.39 -4770.93 0.00 0.00 8125.00 E-I03 t2
ANNOTATIONS
No.
Annotation
TVD
MD
8049.27
8116.38
81 16.38
8116.38 10980.85
8116.38 12454.85
Start Dir 10/100': 10382.21' MD, 8049.27'TVD
EndDir: 10662.31'MD,8116.38'TVD
Start Dir 3/100': 10862.31' MD, 8116.38'TVD
End Dir : 10980.85' MD, 8116.38' TVD
Total Depth: 12454.86' MD, 8116.38' TVD
CASING DETAILS
No. TVD
Size
MD
Name
8031.32
8116.38
10344.00 7
12454.85 4
7.625
4.500
4 il2"
E-IO3 wp05
Total DcplÍ1: 12454.86' MD, 8116.38' TVD
8500
9000
j
9500
§ ~ g ~ !
¿ '" '" '"
:;-
, !2
-. :;;0
" -
~ 0
~ "
~ õ
~ {j ~
~ ~ £
3
-
0 x
~ "
~
;.
f
~ it ¡;
'" .5 ~
2
:;:
"?
--
/
r-:
Õ
v
9
<é
¿
Ô
é <
"' z
~ ~
0 N
C, ,
> ~
.:: ~
"
~ z
~ ¡;
- ;;
~
c~
" ~
^ "
ž ~
~
"
z
¡
ë
~
~
¿
'>
ž
it
'l'
c
-.
ž
<'
is "
'"
<
- v.
z
-
1
~
~
Ó
""
~,
.6
ß
0
0
f:'
-_.__.~--~~-
~
@
~
<;;
8
R
(íj
,".0
NO
'Ú '"
w
u
çji
>
~
ço
~
~
-;-
C--C--V,VNO
-",Oov,O
~~~~¡;;~
OO",v,'Ú-
'Ú'Ú'Ú'Ú'ÚOO
~
:;;:
"-
15
0
z
ëï3
-<
V
0
0
-0
~
Z
C--"
u
~
000000
000000
0600q:o
ov,
000
""
"V,
~,"
0,"
~
~
¡..,-
roOO
oo~
..J:::.....
+-'\0
0..
~ 00
""d;:::J
-
00..
>0
t->
:::::t-
<r:~
-~
-;-
Q
¿
ç;¡ 000000
" 000000
15 oooocio
~~
"':.6
~;;;
vo
~
Q
>
NOOOO"",~,
-c--,n'Úc--",
"06ci06,,o
"'0'Úc--"c--
"v'Úc--ooc--
~' 'é 'é ~' ~' '1
:;;:
r-:
CO
9
¿
Z
'1
Z
"00 C--'Ú " "'
"-NOO'Ú~,
,,0606"':.6":
C",".",,~,NC--
'" "' - ~, " v,
" " V v, v, '.0
V
'"
VO
Q
>
C",C--
C",N
0'"
"..,.
00----
000000000000
~
~
u
~
","'0000
"""0000
"':"':0000
'.0"""'"",,",
0
~
~
s:
Q
>
~
~
d
..,.
55
OO---V""
- c, C", ~, 00 00
,". ci ci ci 0 "
.£000"" "'00 V
,~ ~, '.0 00 '" ..,.
OOOOON
------
u
~
ó
¿
N~,""'n""
"
:;
Q
?
~
~
::..
~
N
¡;j
8
~
.6
g
~
Q
>
~
~
.6
c
>
l-
0
0
0
'1
ç:i
¿
~-
0
0
-
::..
::..
v
:g
.§
is.
ó
¿
~,
ci
55
0
ci
'"
¿;
u
3
0
0
8
~
CD
C",
-;-
~
~
.6
ó
¿
~
:j.
"T
N
"-
~ ~
~ ~
8 ~
<;;
8
-
'="
b
0
:;::
~
Õ
'.0
0
~
6
0
~
0
~
[UIíUOOÇ] (+)~\lONí(-)~)nos
(
f
BP Amoco
SSDS Surveys
i Company: BP Amoco Date: 7/26/2001 Time: 16:40:07
¡ Field: Prudhoe Bay CO-Ordinate(NE) Reference: Well: E-103, True North
. Site: PB E Pad Vertical (I'VD) Reference: Plan E-103 61.38' 61.4
: Well: E-103 Section (VS) Reference: Well (O.ooN,0.00E,324.04Azi)
¡ WeDpath: Plan E-103 Survey Calculation Method: Minimum Curvature Db: Oracle
-- ._~ '-:-:=----=---':-.":':'-:==-=_: -===..:.:::::::- ~==-=-=--==--:::.::.-==c==-=--~-- ---- ---- ---- ------------ ------ --- - ----- - ----===---===-=:==_.- -.. ._--'_--:-':-'l.l
Survey: Start Date:
Page:
1
l
I
; Company:
'. Tool:
Engineer:
Tied-to:
--.------.----------...---- ----'-------'----'-----'_h'--_'_h_h_-__-_--~._-------~-'-"'~---~-----------'--""-------------'-'- ------~_.~-~_u__. .._~ .'----' _._--~----
U_-'-'--'~ .._- ~------------_._._-~-------- - ---_.-_._-----------~---------.--~------------------~----.--.------------- --- ---~--_.__._--- _._---_._~----. ----,
i Field: Prudhoe Bay !
I
I North Slope
UNITED STATES
Map System:US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 4
Goo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre
Sys Datum: Mean Sea Level Geomagnetic Model: BGGM2001
-- - . .--. ------- -- ---.----------- --. ~.._..- h. ._--~_._-- _h____n --. -...-- ----~-.__.._~----~---_.~---_._-~---------_._--_.__.-.~-----.-- ------. ___h____'_'- ._~----- -..-.--.- .-
I We"~-'----' E-1-03~ -------______hh____m_____-_____h______'-~---'--------SI~t-N;me:-~--------~--------------_._---_m ------------- ---
I
I
.___~_I
Well Position: +N/-S 2273.67 ft Northing:
+E/-W 1990.90 ft Easting :
Position Uncertainty: 0.00 ft
5975477.00 ft
664480.00 ft
Latitude:
Longitude:
70 20 21.493 N
148 39 54.902 W
. ~-------- ----- '_'_hh-__'__--'- '.m. -. ---- .-.. --'----'___-_h__'___'-. '---"~~-'-'-----'--------'----------"-' -------"------~----------'---'.-_'__h__".~---'--'-'------------~_h_'-______h'_____'- --. -------- .---.-------.- _.~-
..--. ----.-- --'--'---'- -_"__-h_. ~----.-.- _h_- -'-_'-~h__-_' _h'_'___'-'___-_h__'_._'._-------------------_._~------.- ---~----'-'-'--------- h- -.--.-- -.---..--.... --------- ----.-.---
Well path:
Plan E-103
Current Datum:
Magnetic Data:
Field Strength:
Vertical Section:
Plan E-103 61.38'
6/6/2001
57495 nT
Depth From (TVD) +N/-S
ft ft
..' -.-.-.. -.-----....- -"_'_'-h__'___"-----'-------~ --.._--~_. -- ---...-- h______'-"-'------.'--------'-------'_'__'_h""'- .
0.00 0.00
Height
Drilled From: Plan E-103 pilot hole
Tie-onDepth: 10363.18 ft
61.38 ft Above System Datum: Mean Sea Level
Declination: 26.69deg
Mag Dip Angle: 80.82 deg
+E/-W Direction
ft deg
. h -.-----.-.-.-...----..------..-.--.-.----.--..--..--...,---,,---,--'---"-----"'--"----------'h'_'_h__~__'.h" --.-..- --.-.-.. .--------.--.--.----- ---.---.---
0.00 324.04
- -. . -----.-..- h_"_,_, . - --. -----.- '-....- -.- - . "_'h____- ___h____." .-..-..- _"..n'__'__----__..__n.'____,---- ---- '_'_h'___'_'------ ___'_h____"'--' - -------- .---. .. -.-.--.-----.--.----.---.-.-------.,,--..---.-- -....-.-----. --. -_. -.--... .-.--.. -.- -----..- ...--- 'h_"-m-_--_--.-"-
_....._~- ._- -.'-'--'-'----"---'-----"'----.-'.--'----'.--'----"--'-------------._____h'.- ------'-------'-----'-______h______----'----'..-....--...____h_____~-'---"------------'-"---__'_"'h___"_---'.-.--.-- ...---.--..----....--.. --.- -..-..----. -.------.-.--..-- .-..-
Survey Program for Definitive Wellpath
Date: 7/26/2001 Validated: No
Actual From To Survey
ft ft
Version:
Toolcode
6
Tool Name
.-. . ----.------......-... -....- .--..-.-....-..------ ...-..----..-----.---.....---...--- .... '--_"__"h._-__._.__.__..._._--_._-----~-----_.__.._--_..--------h---'----'----'_____h__-hh"_'_.-"_-_h_"_'_-----__m_.. h'.__'_--------'-"--"'--'--------_---"_h--__'-.'--"-"---_._---_.__...-.-..._--~._-_.-
.-.....-...- .-..- .. .-.-.----. 'h"____"----"-------'-______h_._h___"__--'-_.._._-_._~--'--"--------'--'--""'--------'--'-'---h"------____'_h'-"----'-""'---'-'--______h_.m______-------..----.------,,--,---,,-,,------,.,----.-,---,----'-'---".--___h"h' -.----.-----------...-._____h____-
Plan Section Information
,.. _...c"",.,--.,. ..-----.- .-------- -- -- ---'- ---'-----------'--- ..----- --- -----'------___~_'h__- ---------..
~IMD Incl Aziril TVD +N/-S +E/-W DLS Build Turn TFO Target
¡ ft deg deg ft ft ft deg/10OO deg/100ft deg/100ft deg
.-.-.-..----..- -..-.-..-.--.-.. ...---..------- .-....- ----..-... -.-.--....-......---.--..----."..." -.--.----------. ---......----___"'__h'_'_'_'-'.""-'--.-'__.__h______.-.---- - -----.-..--...------.-.....".-.--..---...-...-,,--....- ----'-"----'-"-".'-----"""-'---"'--'- ----.--...-. - '-----'.".
10363.18 61.99 324.88 8040.33 4934.44 -3499.12 0.00 0.00 0.00 0.00
10382.21 61.99 324.88 8049.27 4948.18 -3508.78 0.00 0.00 0.00 0.00
10662.31 90.00 324.88 8116.38 5168.27 -3663.58 10.00 10.00 0.00 0.00
10862.31 90.00 324.88 8116.38 5331.86 -3778.64 0.00 0.00 0.00 0.00
10980.85 90.00 321.32 8116.38 5426.64 -3849.79 3.00 0.00 -3.00 -90.00
12454.86 90.00 321.32 8116.38 6577.39 -4770.93 0.00 0.00 0.00 0.00 E-103 t2
. _....m ..-------- -----~---- -- ....-.---- ----.. .-- ----....--..-- - - .. h.. ..--..-..-.----..-..---...-.---.------.--------...-- --.. ----"-----------'--------------_____'h__"__-----'-'------------'---'---'-"--'..- -. --.-'_'._"_h__'_"_--- -.-----.----.---.-- ..--..-...------'-"'---"-
Annotation
10382.21
10662.31
10862.31
10980.85
12454.85
8049.27
8116.38
8116.38
8116.38
8116.38
Start Dir 10?/100' : 10382.21' MD, 8049.27'TVD
End Dir : 10662.31' MD, 8116.38' TVD
Start Dir 3?/100': 10862.31' MD, 8116.38'TVD
End Dir : 10980.85' MD, 8116.38' TVD
Total Depth: 12454.86' MD, 8116.38'TVD
.~ '---'------"-"-_"'_h" -'---"""---""----""--'--"-"-"-.'---..------____.-m__....._----------------------_...-.~.-~._-._--_._-_._-------,-,--,-,_'__._m-_____"-'--'--"-----______h__. ~-_._._---_. ,-,-,"'.'-'..'...-_m'_"-_'-"--- .~_.......-- --..---- ----.-.-..
( ('
BP Amoco
SSDS Surveys
, Company: BP Amoco Date: 7/2612001 Time: 16:40:07 Page: 2
! Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: E-103. True North
: Site: PB E Pad Vertical (fVD) Reference: Plan E-103 61.38' 61.4
WeD: E-103 Section (VS) Reference: Well (0.OON,O.OOE.324.04Azi)
: WeDpath: Plan E-103 Survey Calculation Method: Minimum Curvature Db: Oracle
._~----
Survey
- -----'---'--~------'-- ----------'--'-'-----' -'----'----'-'--"---'-----'--1
MD Incl ADm TVD Sys TVD NIS EIW MapN MapE DLS VS \
:
ft deg deg ft ft ft ft ft ft deg/100ft ft I
I
----.------------- --------¡
10363.18 61.99 324.88 8040.33 7978.95 4934.44 -3499.12 5980333.16 660873.73 0.00 6048.83 I
10382.21 61.99 324.88 8049.27 7987.89 4948.18 -3508.78 5980346.68 660863.77 0.00 6065.62 I
I
10400.00 63.77 324.88 8057.38 7996.00 4961.13 -3517.89 5980359.43 660854.38 10.00 6081.45
10450.00 68.77 324.88 8077.50 8016.12 4998.56 -3544.21 5980396.27 660827.24 10.00 6127.21
I
10500.00 73.77 324.88 8093.55 8032.17 5037.28 -3571.45 5980434.38 660799.17 10.00 6174.54
10550.00 78.77 324.88 8105.41 8044.03 5076.99 -3599.38 5980473.47 660770.37 10.00 6223.09
10600.00 83.77 324.88 8113.00 8051.62 5117.40 -3627.80 5980513.24 660741.07 10.00 6272.49
10650.00 88.77 324.88 8116.25 8054.87 5158.20 -3656.50 5980553.40 660711.49 10.00 6322.36
10662.31 90.00 324.88 8116.38 8055.00 5168.27 -3663.58 5980563.31 660704.19 10.00 6334.67
10700.00 90.00 324.88 8116.38 8055.00 5199.10 -3685.26 5980593.65 660681.84 0.00 6372.36
10800.00 90.00 324.88 8116.38 8055.00 5280.89 -3742.79 5980674.16 660622.53 0.00 6472.35
10862.31 90.00 324.88 8116.38 8055.00 5331.86 -3778.64 5980724.32 660585.58 0.00 6534.65
10900.00 90.00 323.75 8116.38 8055.00 5362.47 -3800.63 5980754.44 660562.93 3.00 6572.34
10980.85 90.00 321.32 8116.38 8055.00 5426.64 -3849.79 5980817.51 660512.37 3.00 6653.15
11000.00 90.00 321.32 8116.38 8055.00 5441.59 -3861.76 5980832.19 660500.08 0.00 6672.28
11100.00 90.00 321.32 8116.38 8055.00 5519.65 -3924.26 5980908.86 660435.89 0.00 6772.16
11200.00 90.00 321.32 8116.38 8055.00 5597.72 -3986.75 5980985.53 660371.70 0.00 6872.05
11300.00 90.00 321.32 8116.38 8055.00 5675.78 -4049.25 5981062.20 660307.51 0.00 6971.94
11400.00 90.00 321.32 8116.38 8055.00 5753.85 -4111.75 5981138.87 660243.32 0.00 7071.83
11500.00 90.00 321.32 8116.38 8055.00 5831.91 -4174.24 5981215.54 660179.13 0.00 7171.71
11600.00 90.00 321.32 8116.38 8055.00 5909.98 -4236.74 5981292.21 660114.94 0.00 7271.60
11700.00 90.00 321.32 8116.38 8055.00 5988.04 -4299.24 5981368.88 660050.75 0.00 7371.49
11800,00 90.00 321.32 8116.38 8055.00 6066.11 -4361.73 5981445.55 659986.56 0.00 7471.37
11900.00 90.00 321.32 8116.38 8055.00 6144.17 -4424.23 5981522.22 659922.37 0.00 7571.26
12000.00 90.00 321.32 8116.38 8055.00 6222.24 -4486.73 5981598.89 659858.18 0.00 7671.15
12100.00 90.00 321.32 8116.38 8055.00 6300.30 -4549.23 5981675.56 659793.99 0.00 7771.03
12200.00 90.00 321.32 8116.38 8055.00 6378.37 -4611.72 5981752.23 659729.80 0.00 7870.92
12300.00 90.00 321.32 8116.38 8055.00 6456.43 -4674.22 5981828.90 659665.61 0.00 7970.81
12400.00 90.00 321.32 8116.38 8055.00 6534.50 -4736.72 5981905.57 659601.42 0.00 8070.70
12454.86 90.00 321.32 8116.38 8055.00 6577.39 -4770.93 5981947.70 659566.27 0.00 8125.51
.-,,-..- - -.....-..-- ..-. .....---.,-----.-.-----.----.-,,-..-.-.-.....--..-...- .~._.__...._._--..__.._- '.._.._-_.._-------_..._.._-_..~--_..._.._._._........._----_....._-_._------..__._---_._---~.- -'-----'~-'-'------"---'-----"-'----"- -.-.-.....---.-..--.---.-.-------....--.-..-....--......-...--..."-"....-,,.-.--. -- - .-.
( POST THIS NOTICE IN THE DOGHOUS(
E-103 Rig site
Summary of Drilling Hazards
./ Standard Operating Procedures for H2S precautions should be followed at
all times. The highest level of H2S recently measured on E-pad, in the last 12
months, was on E-02A, E-05A, E-08, and E-28A @ 10 ppm, (September 2000).
./ All wells pass major risk criteria. However, E-103 will pass within less than 100'
from three wells: E-02A = 31.7' center-to-center at 871' MD; E-16 = 71.7' at 500'
MD; and E-26A at 61.5' at 1147'MD. A surface gyro will be required to
approximately 1000'.
./ The SV4 sand may contain gas hydrates, though little or none are expected.
Hydrates will be treated at surface with appropriate mud products.
./ Be prepared for possible coal seams at the top of the UGNU. Indications will be
erratic torque and possibly connection gas.
./ Continue best practices for well control during drilling the UGNU. Monitor for
signs of a kick.
./ The pressure in the Kuparuk is expected to be 3200 psi. Initially, it was -4100psi.
The HAl will require a mud weight of about 10.7 ppg. The Kuparuk will be
equivalent to -7.8 ppg. Be prepared for possible lost circulation and differential
sticking.
./ Lost circulation may also be experienced while running 7 5/8" casing. The SSD
lost circulation tree should be followed if lost fluid returns are encountered.
./ This is the first horizontal well in the Midnight Sun E-Pad development. Follow
established procedures for a standard fully-cemented liner. Success will be
driven by proper pre-job planning meetings and communication throughout the
job.
./ The operation is planned with approximately 1500' of perforation at 500 psi
underbalance which may induce stuck pipe (guns). Upon running in hole with
perf guns, observe the running parameters to detect higher drag that may
indicate cement stringers or debris left in the production liner. POH with perf
guns prior to perforating and make a clean out run if excessive drag is evident.
./ Follow all service company rules and regulations while handling perf guns and
ensure only the necessary people are on the rig floor during make up and AIH.
CONSULT THE PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL
INFORMATION.
E-I03
E-103 permit correction
{
Subject: E-103 permit correction
Date: Fri, 12 Oct 2001 13:47:25 -0500
From: "Smith, Phil G (FAIR)" <SmithPG1@BP.com>
To: "Tom Maunder (E-mail)" <tom_maunder@admin.state.ak.us>
Tom
Please note the correction to the E-103 permit application: Page 7 in the
hazards and contingencies section should read, "top of cement to 500' MD
above the CM2, or +/- 1000' MD above the top Kuparuk."
Thanks,
Phil
1 of 1
Ii"
'~
10/12/0111:04AM
i
"
/
('
i~
r I
~
1/
~O7
DATE
07/31/01
CHECK NO.
00194723
H 194723
DATE
INVOICE / CREDIT MEMO
DESCRIPTION
GROSS
VENDOR
DISCOUNT
ALASKAOILA
NET
00
072701 CK072701N
P YMT OMMENTS:
HANDL NG INST:
100.00
100.00
Per it To Drill ee
S/H - Terrie Hub Ie
X4628
TOTAL ~
IE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
100.00
100.00
BP EXPLORATION, (ALASKA) INC.
P.O. BOX 196612
ANCHORAGE, ALASKA 99519-6612
FIRST NATIONAL BANK OF ASHLAND
AN AFFILIATE OF
NATIONAL CITY BANK
CLEVELAND, OHIO
No.H
19472d
CONSOLIDATED COMMERCIAL ACCOUNT
,
56.389
412
00194723
PAY
ONE HUNDRED & DOl 1 OO***************~J:i-********************* US DOLLAR
DATE
07/31/01
II
'., AMOUNT
. $1 00. 00 I
To The
ORDER
Of
ALASKA OIL AN~ QAS
CONSERVATIONêOMMISSION
. '
333 WEST 7TH AVENUE
SUITE 100
ANCHORAGE
NOTVALID AFTER 120 DAYS'
AK 99501
\( .. ..
, .~~ .. ~" ..(1,
, l 1'I4,'
. G. . ß ~!l~,::"~
III ¡. q ... 7 2 ~ III I: 0 ... ¡. 2 0 ~ 8 q 5 I: 0 0 8 ...... ¡. q III
bp
('
January 23,2001
('
,\t~~~.
..~~~ ,.~~.
~- ~4'3
..~ ~~..
.'J'~\"
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P. O. Box 196612
Anchorage. Alaska 99519-6612
(907) 561-5111
Tom Maunder
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, AK 99501
Dear Tom:
Ae: Sundry Notice for E-1 03 to run Liner Patch across an ECP
-:.~
New well E-103 was POP'd through a portable flow-back separator on 12/28/01 with
production of - 8 mmcfd and no liquids or solids; two subsequent attempts to flow to
facilities have resulted in gas-production & hydrates even with aggressive methanol
usage.
Damage in the horizontal sectigr:1 is suspected as well as gas leakage into the 4-1/2"
liner above the ECP at 10650' through an unclosed ES cementer port that has
approximately 111 ID. The extremely low temps & hydrates are likely caused by Jt ./
cooling across this lIorificell which must be isolated with a AVA DWP (HES) tubing
patch in order to produce the well & cleanup the horizontal section.
BP Exploration Alaska, Inc. proposes to set the 4 %11 DWP coil with Baker Model J
Hydraulic setting tool using the Schlumberger DepthLog for real-time CCL}tie-in.
The procedure includes the following major steps:
-IYpe N Description
0 1 TI FL
C 2 CT Tb9" Patch w/Depthlog. Acid wash, POP
Current Status:
Last Test:
Max Deviation:
Pay Deviation:
Minimum ID:
Last Tag TD:
Last Downhole Op:
Latest H2S Value:
Reservoir P & T:
Contact Name
Jim Young
Steve Deckert
SI, pending diagnostic & remedial work.
8 MMSCFGPD & 0 BPD on 12/28/01.
94° at 10850' MD.
Horizontal (88° to 94°).
3.813" X »}ipples at 1 0051' & 1 01 05' MD.
> 10565' MD on 12/19/01 SIBHP.
Injectivity test 0.5 BPM at 1500 psi on 12/30/01.
< 10 ppm /'
3360 psig & 160°F at 10565' MD (8100' TVD). Note 8.0 ppg emw
slightly underbalanced.
Work
564-5754
564-4128
Home
248-0133
338-1476
,m
Cell
440-8007
240-8046
('
Preprrubing Patch Procedure:
,'.
(,"
.,
1. Perform tubing integrity test (TIFl).
a. If TIFl fails: fluid pack the IA and freeze protect. Be prepared to pump
more freeze protect fluid down IA to maintain pressure at or slightly
abo)'e tubing while pumping acid.
2. MIRUþTU, FCO/jet hydrates to PBTD (possible hydrates at 10650'). Drift to
3.80" ID (3.78" required for tubing patch).
3. RIH with 4-1/2" DWP Tubing Patch and Schlumberger Depthlog for real-time
CCl correlation to liner tally.
a. Use CCl to verify Elements acro~ ES cementer (2.3' length) at 1 0650' ,~
b. Se~ I~~er DWP in 9.~ pup joint below ES ce~enter & upper DWP In J ,'; ,,/ "~
solid JOint above ES cementer (See attached liner tally). Mff'..-t?-.r (i /..t- 1
Please call (Jim Young 564-5754, hm: 248-0133, cell: 440-8007) if there are
any questions.
Sincerely,
~~/o~
Ji Young .J
Greater Prudhoe Bay
Midnight Sun Development Engineer
(
TRANSMIT AL LETTER CHECK LIST
CIR CLE APPRO PRIA TE LETTER/P ARA GRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELLNAMŒ ß5¿¿ E-/D-3
CHECK 1
STANDARD LETTER
DEVELOPMENT
CHECK WHAT APPLIES
ADD-ONS (OPTIONS)
MULTI LA TERAL
/
(If api number last two (2)
digits are between 60-69)
DEVELOPMENT
REDRILL
PILOT HOLE (PH)
v
EXPLORATION
,-
ANNULAR I)1SPOSAL
( /) NO
"V
INJECTION WELL
ANNULAR DISPOSAL
L-) YES
INJECTION WELL
RED RILL
ANNULAR DISPOSAL
THIS WELL
"CLUE"
The permit is for a new well bore segment of existing well
. Permit No, API No. .
Production should continue to be reported as a function of
the original API number stated above.
In accordance with 20 AAC 25.005(1), all records, data and
logs acquired for the pilot hole must be clearly
differentiated in both name (name on permit plus PH)
and API number (50 -70/80) from
records, data and logs acquired for well (name on permit).
Annular disposal has not been requested. . .
Annular Disposal of drilling wastes will not be approved. . .
Annular Disposal of drilling wastes will not be approved. . .
I
DISPOSAL INTO OTHER Please note that an disposal of fluids generated. . .
ANNULUS
L-) YES +
SP ACING EXCEPTION
Templates are located m drive\jody\templates
Enclosed is the approved application for permit to drill the
above referenced well. The permit is approved. sùbject to
full compliance with 20 AAC 25.055. Approval to perforate
and produce is contingent upon issuance of a conservation
order approving a spacing exception.
(Companv Name) will assume the liability of any protest to
the spacing exception that may occur.
COMPANY WELL NAME E - /ð3 PROGRAM: exp - dev - redrll
INITCLASS ~El/ !CJ/L GEOLAREA f?9'{J
1.Permitfeeattached..........,./..,.......... (Ÿ N
2. Lease number appropriate.~.~.j-=t<~èIJ~). /P.-?it? ~ . Y N SurfA-ú-- 'Ó£'. -'-l2>L ozgæ '.
3. Uniquewellnameandnumber............. -..,. . N -í,Þ, ¡;1~ /!p¿ O?-8"2-77.
4. Well located in a defined pool.. . . . . . . . . . . . . . . . .
5. Well located proper distance from drilling unit boundary. . . .
6. Well located proper distance from other wells. . . . . . . . . .
7. Sufficient acreage available' in drilling unit.. . . . . . . . . . .
8. If deviated, is well bore plat included.. . . . . . . . . . . . . .
9. Operator only affected party.. . . . . . . . . . . . . . . . . .
10. Operator has appropriate bond in force. . . . . . . . . . . . .
11. Permit can be issued without com-.ervation order. . . . . . . .
12. Permit can.be issued without administrative approval.. . . . .
13. Can permit be approved before 15-day wait.. . . . . . . . . . Y
14. Conductor string provided. . . . . . . . . . . . . . . . . . . ~ N
15. Surface casing protects all known USDWs. . . . . . . . . . . Y' N
16. CMT vol adequate to circulate on conductor & surf csg. . . . . Y) -~.
17. CMT vol adequate to tie-in long string to surf csg. . . . . . . . Y \t:!J
18. CMT will cover alt known productive horizons. . . . . '. . . . . ~ N
19. Casing designs adequate for C, T, B & permafrost. . . . . . . N
20. Adequatetankageorreservepit.. . . .. .. . . ., . . . . . y N~\~~,- (,~~~.~'- ~\~ .
21. If a re-drill, has a 10-403 for abandonment been approved. . . y t~ ~ ~.,) t - \"\ \ .... î... ~ I ~ ..1 "
22. Ad~quate wellt:><>re sepa~tion propose~.. . . . . . . . . . . . N C'\~~~~'Y'-~~~ "=> ,tK:"'-..~\~\Cl.~J f~~ X'\c\\.~N:."-C-)
23. If dlverter required, does It meet regulations. . . . . . . . . . N '
24. Drilling .fluid program schematic & equip list adequate. . . . . N
25. BOPEs, do they meet regulation. . . . . . . . . .r.'"'.,:v. . . . N \t.. 4; . t:'\ n\t~~ '
. 26. BOPE press rating appropriate; test to ') ~ psig. N\--\~ ~\' ~~\- ~ ~ ~ \\.. ,,) ,,~ \
27. Choke manifold complies w/API RP-53 (May 84). . . . . . . . N .
28. Work wilt occur without operation shutdown. . . . . . . . . . . Ak ~ ~ :D . ~ ~ 4..J ' . è; ~ ~
29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . Y ~ ~ ...;""O~ ~~~~'~, o.~'( :-> \\~ "> E¿V~'\~<Y~ ( 5<l.('\~ ~. \~~\)(,/
30. Permit can be issued w/o hydrogen sulfide measures. . . .. éf) N '
31. Data presented on potential overpressure zones. . . . . . . ~
32. Seismic anal~~is of shallo~ gas zones. . . . . . . . . . . . . ,J fl: Y N
APPR DATE; 33. Seabed condition survey (if off-shore). . . . . . . . . . ~ Y N
J.D /0. y, D/ 34. Contact name/phone for weekly progress reports [expJ.øfatory only] Y N
l'
ANNULAR DISPOSAL35. With proper cementing records, this plan.
(A) will contain waste in a suitable receiving zone; . . . . . . .
(B) wilt not contaminate frèshwater; or cause drilling waste. ..
to surface; .
(C) will not impair mechanical integrity of the well used for disposal; Y N
(D) will not damage producing formation or impair recovery from a Y N
pool; and
E will not circumvent 20 MC 25.252 or 20 MC 25.412. Y N
GE~ ENGINEERING: UICI nula, COMMISSION:
R~ WM 8~
S .' 0 . ¿-- JMrfJ ð J B: /f1'I ~
WELL PERMIT CHECKLIST
FIELD & POOL
ADMINISTRA TION
A:~ DATE; I
ID.\f.b
ENGINEERING
~ ~¡ff-
GEOLOGY
APPR
DATE
c:\msoffice\wordian\diana\checklist (rev. 11/01//00)
serv
wellbore seg _ann. disposal para req-
O//'-r:;O ON/OFF SHORE 0)1
UNIT#
þ,- D2bCfl.
/
c
0
Z
0
~
~
;0
f
~'
m
-
Z
-t
,J:
-
en
:Þ
;0
m
:Þ
-(
Y N
Y N
r\\^, " ~ '-'I;:~ ~,
~~,\"'- 'I.....} ",,-,.~,
Com m e nts/I nstructions:
¡
1,.
(
Well H ¡story File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file. .
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special' effort has been made to chronologically
, .
organize this category of information.
(
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Mon Jun 24 13:24:06 2002
Reel Header
Service name. ........ ....LISTPE
Date.....................02/06/24
Origin...................STS
Reel Name........... .... . UNKNOWN
Continuation Number..... .01
Previous Reel Name. ..... . UNKNOWN
Comments................ .STS LIS
Tape Header
Service name............ .LISTPE
Date.....................02/06/24
Origin...................STS
Tape Name... ........ .... . UNKNOWN
Continuation Number. .... .01
Previous Tape Name...... . UNKNOWN
Comments.................STS LIS
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
#
WELL CASING RECORD
1ST STRING
MWD RUN 1
AK-MM-1l180
J. MARTIN
L. VAUGHAN
MWD RUN 4
AK-MM-1l180
H. COOMANSIN
A. MADSEN
MWD RUN 7
AK-MM-11180
B. HENNINGSE
A. MADSEN
MSL 0)
Writing Library.
Writing Library.
E-103
500292304500
BP Exploration
Sperry Sun
24-JUN-02
MWD RUN 2
AK-MM-11180
J. MARTIN
L. VAUGHAN
MWD RUN 5
AK-MM-11180
R. MCNEILL
A. MADSEN
6
llN
14E
4889
501
.00
63.68
29.20
'II'
'~,
Scientific Technical Services
Scientific Technical Services
(Alaska), Inc.
MWD RUN 3
AK-MM-11180
J. MARTIN
A. MADSEN
MWD RUN 6
AK-MM-11180
R. MCNEILL
A. MADSEN
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
13.500 20.000 4506.0
aO)VdÒ(J
( 09103
(
~,
;(
2ND STRING
3RD STRING
PRODUCTION STRING
9.875
6.750
10.750
7.625
10281.0
12240.0
#
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2.
ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTHS (TVD).
3. MWD RUNS 1-2 ARE DIRECTIONAL WITH NATURAL GAMMA
PROBE (NGP)
UTILIZING SCINTILLATION DETECTORS.
4.
MWD RUN 3 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR)
UTILIZING GEIGER-MULLER TUBE DETECTORS.
5. MWD RUNS 4-5 ARE DIRECTIONAL WITH DGR,
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR-4) , STABILIZED
LITHO-DENSITY (SLD),
COMPENSATED NEUTRON POROSITY (CNP) AND ACOUSTIC
CALIPER (ACAL).
6.
MWD RUNS 6-7 ARE DIRECTIONAL WITH DGR, EWR-4, SLD,
AND COMPENSATED THERMAL NEUTRON POROSITY (CTN).
7. MWD RUN 6 IS A PILOT HOLE, WITH WELLBORE DESIGNATED
PBl.
DURING MWD RUN 7, E-103 KICKS OFF FROM E-103 PB1 AT
CEMENT PLUG WITH TOP SET AT 10312' MD, 8012' TVD.
8.
DEPTH-SHIFTING IS WAIVED PER THE E-MAIL OF 12/5/2001
OF D. SCHNORR OF BP EXPLORATION (ALASKA) INC.
9. MWD RUNS 1-7 REPRESENT THE MWD DATA FOR WELL E-103
WITH
API# 50-029-23045-00. THIS WELL REACHED A TOTAL
DEPTH
(TD) OF 12240' MD, 8101' TVD.
SROP = SMOOTHED RATE OF PENETRATION
SGRD = SMOOTHED GAMMA RAY - SCINTILLATION DETECTORS
SGRC = SMOOTHED GAMMA RAY - GEIGER-MULLER TUBE DETECTORS
SEXP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( EXTRA
SHALLOW SPACING)
SESP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
SHALLOW SPACING)
SEMP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( MEDIUM
SPACING)
SEDP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( DEEP
SPACING)
SFXE = SMOOTHED FORMATION EXPOSURE TIME
SBD2 = SMOOTHED BULK DENSITY (LOW-COUNT BIN)
SCO2 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN)
SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR
(LOW-COUNT BIN)
TNPS = SMOOTHED THERMAL NEUTRON POROSITY
(SANDSTONE MATRIX, FIXED HOLE SIZE)
SPSF = SMOOTHED COMPENSATED NEUTRON POROSITY
(SANDSTONE MATRIX, HOLE SIZE MEASURED BY ACOUSTIC
CALIPER)
PARAMETERS USED IN NEUTRON / POROSITY LOG CALCULATIONS:
HOLE SIZE: 9.875 (MEASURED) AND 6.75" (FIXED)
MUD WEIGHT: 8.8 - 10.7 PPG
MUD FILTRATE SALINITY: 150 - 800 PPM CHLORIDE
FORMATION WATER SALINITY: 50,000 PPM CHLORIDE
FLUID DENSITY: 1.0 G/CC
MATRIX DENSITY: 2.65 G/CC
('
LITHOLOGY:
SANDSTONE
$
File Header
Service name........... ..STSLIB.OOl
Service Sub Level Name...
Version Number.... ..... ..1.0.0
Date of Generation...... .02/06/24
Maximum Physical Record..65535
File Type............. ...LO
Previous File Name..... ..STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
SGRD
SROP
SEXP
SESP
SEMP
SEDP
SFXE
ACAL
SNNA
SNFA
SPSF
SBD2
SCO2
SNP2
$
1
~i
clipped curves; all bit runs merged.
.5000
START DEPTH
70.0
114.0
4459.0
4459.0
4459.0
4459.0
4459.0
6579.0
6586.0
6586.0
6586.0
6596.5
6596.5
6596.5
STOP DEPTH
12183.5
12240.0
12190.5
12190.5
12190.5
12190.5
12190.5
10188.5
12147.0
12146.5
12146.5
11504.0
11504.0
11531.5
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE
MWD 1 70.0 2504.0
MWD 2 2504.5 4506.0
MWD 3 4506.5 6737.0
MWD 4 6737.5 10017.0
MWD 5 10017 . 5 10281. 0
MWD 6 10281. 5 11293.5
MWD 7 11294.0 12240.0
$
#
REMARKS: MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type.... ...... ...... ..0
Data Specification Block Type.....O
Logging Direction.... ....... ..... . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing................. ... .60 .1IN
Max frames per record..... ...... ..Undefined
Absent value...... ....,. ........ ..-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service
DEPT
ROP
GR
RPX
Units
FT
FPH
API
OHMM
Order
Size Nsam
4 1
4 1
4 1
4 1
MWD
MWD
MWD
Rep Code
68
68
68
68
Offset
0
4
8
12
Channel
1
2
3
4
I'
(
~,
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HRS 4 1 68 28 8
RHOB MWD G/CC 4 1 68 32 9
DRHO MWD G/CC 4 1 68 36 10
PEF MWD B/E 4 1 68 40 11
NPHI MWD PU 4 1 68 44 12
FCNT MWD CP30 4 1 68 48 13
NCNT MWD CP30 4 1 68 52 14
CALA MWD IN 4 1 68 56 15
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 70 12240 6155 24341 70 12240
ROP MWD FPH 0 1026.31 185.651 24253 114 12240
GR MWD API 8.24 325.8 76.0206 24228 70 12183.5
RPX MWD OHMM 0.29 2000 31. 8328 15464 4459 12190.5
RPS MWD OHMM 0.51 1735.16 44.4935 15464 4459 12190.5
RPM MWD OHMM 0.68 2000 40.9554 15464 4459 12190.5
RPD MWD OHMM 0.71 2000 73.8115 15464 4459 12190.5
FET MWD HRS 0.09 79.7 1. 74603 15464 4459 12190.5
RHOB MWD G/CC 1. 68 3.731 2.42654 9741 6596.5 11504
DRHO MWD G/CC -0.747 1. 373 0.0846017 9741 6596.5 11504
PEF MWD B/E 1. 07 16.85 3.67378 9871 6596.5 11531. 5
NPHI MWD PU 2.6 51.47 26.8401 11122 6586 12146.5
FCNT MWD CP30 111. 3 1147 512.471 11122 6586 12146.5
NCNT MWD CP30 2128 30523.7 8978.46 11123 6586 12147
CALA MWD IN 9.3 12.18 10.3913 7220 6579 10188.5
First Reading For Entire File........ ..70
Last Reading For Entire File.......... .12240
File Trailer
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/06/24
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/06/24
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.001
Conunent Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
header data for each bit run in separate files.
1
.5000
START DEPTH
70.0
114.0
STOP DEPTH
2460.0
2504.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
04-NOV-01
;1
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.... """ .Feet
Data Reference Point......... .... .Undefined
Frame Spacing............... ......60 .1IN
Max frames per record... "". .....Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type. ..0
Name Service Order
DEPT
ROP MWD010
GR MWD010
Insite
66.16
Memory
2504.0
114.0
2504.0
.0
42.2
TOOL NUMBER
13.500
Spud Mud
9.30
360.0
9.0
250
10.2
.000
.000
.000
.000
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FPH 4 1 68 4 2
API 4 1 68 8 3
Name Service Unit
DEPT FT
ROP MWD010 FPH
GR MWD010 API
Min
70
0
18.53
Max
2504
1026.31
116.18
First Reading For Entire File.. ....... .70
Last Reading For Entire File.......... .2504
File Trailer
Service name........... ..STSLIB.002
Mean Nsam
1287 4869
188.792 4781
59.5569 4781
i
1,
.0
70.0
.0
.0
First
Reading
70
114
70
Last
Reading
2504
2504
2460
(
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation... ... .02/06/24
Maximum Physical Record. .65535
File Type............... .LO
Next File Name. ......... .STSLIB.003
Physical EOF
File Header
Service name... ........ ..STSLIB.003
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation..... ..02/06/24
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name..... ..STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
3
~:(
header data for each bit run in separate files.
2
.5000
START DEPTH
2460.5
2504.5
STOP DEPTH
4462.0
4506.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
05-NOV-Ol
Insite
66.16
Memory
4506.0
2504.0
4506.0
41. 6
46.1
TOOL NUMBER
13.500
Spud Mud
9.40
315.0
9.1
250
7.0
.000
.000
.000
.000
.0
82.6
.0
.0
If
"
í
'i
'I:,
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type...... ............0
Data Specification Block Type.....O
Logging Direction..... """"'" . Down
Optical log depth units.......... .Feet
Data Reference Point.. ........... .Undefined
Frame Spacing......... """"'" .60 .1IN
Max frames per record............ . Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD020
GR MWD020
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FPH 4 1 68 4 2
API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 2460.5 4506 3483.25 4092 2460.5 4506
ROP MWD020 FPH 11.78 906.52 216.907 4004 2504.5 4506
GR MWD020 API 22.79 148.16 85.6051 4004 2460.5 4462
First Reading For Entire File......... .2460.5
Last Reading For Entire File.......... .4506
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/06/24
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation.... ...02/06/24
Maximum Physical Record..65535
File Type................LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPX
RPS
RPD
FET
RPM
GR
ROP
$
4
header data for each bit run in separate files.
3
.5000
START DEPTH
4459.0
4459.0
4459.0
4459.0
4459.0
4462.5
4506.5
STOP DEPTH
6689.0
6689.0
6689.0
6689.0
6689.0
6697.0
6737.0
#
(
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
EWR4
DGR
$
BOTTOM)
TOOL TYPE
ELECTROMAG. RESIS. 4
DUAL GAMMA RAY
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..... .............0
Data Specification Block Type.....O
Logging Direction......... ....... . Down
Optical log depth units.... ...... .Feet
Data Reference Point....... ...... .Undefined
Frame Spacing......... .... ....... .60 .1IN
Max frames per record. ..... ...... .Undefined
Absent value...... ............... .-999
Depth Units.......................
Datum Specification Block sub-type...O
08-NOV-01
Insite
66.16
Memory
6737.0
4506.0
6737.0
39.1
45.8
TOOL NUMBER
13.500
LSND
9.50
52.0
9.0
300
6.2
2.600
1.630
5.000
8.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FPH 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HRS 4 1 68 28 8
Name Service Unit
DEPT FT
ROP MWD030 FPH
Min
4459
9.13
Max
6737
991.51
Mean Nsam
5598 4557
274.729 4462
"I:
,I
I~I,
65.0
107.6
65.0
65.0
First
Reading
4459
4506.5
Last
Reading
6737
6737
(
~.
GR MWD030 API 8.24 124.48 64.136 4470 4462.5 6697
RPX MWDO 3 0 OHMM 0.76 61. 23 3.41969 4461 4459 6689
RPS MWD030 OHMM 0.81 1162.71 5.13798 4461 4459 6689
RPM MWD030 OHMM 0.69 2000 14.5705 4461 4459 6689
RPD MWD030 OHMM 0.71 2000 21.7008 4461 4459 6689
FET MWD030 HRS 0.09 60.63 1.71075 4461 4459 6689
First Reading For Entire File......... .4459
Last Reading For Entire File.......... .6737
File Trailer
Service name.... ...... ...STSLIB.004
Service Sub Level Name...
Version Number..... ... ...1.0.0
Date of Generation...... .02/06/24
Maximum Physical Record..65535
File Type............. ...LO
Next File Name..... ... ...STSLIB.005
Physical EOF
File Header
Service name............ .STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/06/24
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
CALA
NPHI
FCNT
NCNT
RHOB
DRHO
PEF
FET
RPX
RPS
RPD
RPM
GR
ROP
$
5
header data for each bit run in separate files.
4
.5000
START DEPTH
6579.0
6586.0
6586.0
6586.0
6596.5
6596.5
6596.5
6689.5
6689.5
6689.5
6689.5
6689.5
6697.5
6737.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
STOP DEPTH
9926.0
9933.0
9933.0
9933.0
9944.0
9944.0
9944.0
9976.5
9976.5
9976.5
9976.5
9976.5
9984.0
10017.0
11-NOV-01
Insite
66.16
Memory
10018.0
6737.0
10018.0
38.5
47.1
TOOL NUMBER
..1,
'II
'-
~.'
CNP COMPENSATED NEUTRON
SLD STABILIZED LITHO DEN
EWR4 ELECTROMAG. RESIS. 4
DGR DUAL GAMMA RAY
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN): 13 . 500
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
LSND
9.70
50.0
9.0
150
5.0
1.200
.670
1.400
1.800
68.0
127.0
68.0
68.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point.......... ... .Undefined
Frame Spacing................. ... .60 .1IN
Max frames per record.......... ...Undefined
Absent value.......... ......... ...-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FPH 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
RPX MWD040 OHMM 4 1 68 12 4
RPS MWD040 OHMM 4 1 68 16 5
RPM MWD040 OHMM 4 1 68 20 6
RPD MWD040 OHMM 4 1 68 24 7
FET MWD040 HRS 4 1 68 28 8
RHOB MWD040 GICC 4 1 68 32 9
DRHO MWD040 GICC 4 1 68 36 10
PEF MWD040 BIE 4 1 68 40 11
NPHI MWD040 PU 4 1 68 44 12
FCNT MWD040 CP30 4 1 68 48 13
NCNT MWD040 CP30 4 1 68 52 14
CALA MWD040 IN 4 1 68 56 15
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 6579 10017 8298 6877 6579 10017
ROP MWD040 FPH 0 1720.83 170.558 6560 6737.5 10017
GR MWD040 API 23.63 256.33 87.6267 6574 6697.5 9984
RPX MWD040 OHMM 0.65 12.43 3.17953 6575 6689.5 9976.5
RPS MWD040 OHMM 0.67 12.97 3.18395 6575 6689.5 9976.5
RPM MWD040 OHMM 0.68 11.22 3.22314 6575 6689.5 9976.5
RPD MWD040 OHMM 0.71 10.82 3.23601 6575 6689.5 9976.5
FET MWD040 HRS 0.13 19.55 0.906029 6575 6689.5 9976.5
RHOB MWD040 GICC 1. 889 3.731 2.35533 6696 6596.5 9944
~'
"
~
DRHO MWD040 G/CC -0.153 1.373 0.0735694 6696 6596.5 9944
PEF MWD040 B/E 1.18 9.41 2.68683 6696 6596.5 9944
NPHI MWD040 PU 2.6 48.99 20.8933 6695 6586 9933
FCNT MWD040 CP30 426 1147 646.93 6695 6586 9933
NCNT MWD040 CP30 2128 3697 2732.42 6695 6586 9933
CALA MWD040 IN 9.3 12.18 10.3894 6695 6579 9926
First Reading For Entire File......... .6579
Last Reading For Entire File.......... .10017
File Trailer
Service name............ .STSLIB.005
Service Sub Level Name...
Version Number.. ...... ...1.0.0
Date of Generation.... ...02/06/24
Maximum Physical Record..65535
File Type.............. ..LO
Next File Name......... ..STSLIB.006
Physical EOF
File Header
Service name............ .STSLIB.006
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/06/24
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
FCNT
CALA
NPHI
NCNT
RHOB
DRHO
PEF
RPX
RPS
RPM
RPD
FET
GR
ROP
$
6
header data for each bit run in separate files.
5
.5000
START DEPTH
9922.5
9926.5
9933.5
9933.5
9944.5
9944.5
9944.5
9977.0
9977.0
9977.0
9977.0
9977.0
9984.5
10017.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
STOP DEPTH
10195.5
10188.5
10195.5
10195.5
10206.0
10206.0
10206.0
10239.0
10239.0
10239.0
10239.0
10239.0
10246.5
10281. 0
12-NOV-01
Insite
66.16
Memory
10281. 0
10018.0
10281.0
51. 4
59.5
TOOL NUMBER
(
l
CNP COMPENSATED NEUTRON
SLD STABILIZED LITHO DEN
EWR4 ELECTROMAG. RESIS. 4
DGR DUAL GAMMA RAY
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN): 13.500
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
LSND
10.70
53.0
9.2
200
4.0
1. 300
.720
1. 400
1. 900
65.0
122.0
65.0
65.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.... ..............0
Data Specification Block Type.....O
Logging Direction.... ."'.'."'" . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value..................... .-999
Depth Units.......................
Datum Specification Block sub-type. ..0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD050 FPH 4 1 68 4 2
GR MWD050 API 4 1 68 8 3
RPX MWD050 OHMM 4 1 68 12 4
RPS MWD050 OHMM 4 1 68 16 5
RPM MWD050 OHMM 4 1 68 20 6
RPD MWD050 OHMM 4 1 68 24 7
FET MWD050 HRS 4 1 68 28 8
RHOB MWD050 GICC 4 1 68 32 9
DRHO MWD050 GICC 4 1 68 36 10
PEF MWD050 BIE 4 1 68 40 11
NPHI MWD050 PU 4 1 68 44 12
FCNT MWD050 CP30 4 1 68 48 13
NCNT MWD050 CP30 4 1 68 52 14
CALA MWD050 IN 4 1 68 56 15
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9922.5 10281 10101.8 718 9922.5 10281
ROP MWD050 FPH 0.84 412.81 34.9898 528 10017.5 10281
GR MWD050 API 44.59 325.8 153.797 525 9984.5 10246.5
RPX MWD050 OHMM 2.25 7.03 3.86032 525 9977 10239
RPS MWD050 OHMM 2.08 6.87 3.94731 525 9977 10239
RPM MWD050 OHMM 1. 98 6.89 4.16099 525 9977 10239
RPD MWD050 OHMM 2.14 6.94 4.1301 525 9977 10239
FET MWD050 HRS 1. 08 18.36 4.22394 525 9977 10239
RHOB MWD050 GICC 1.988 2.719 2.38943 524 9944.5 10206
t
.(
i{
DRHO MWD050 G/CC -0.072 0.535 0.134983 524 9944.5 10206
PEF MWD050 B/E 2.86 9.39 5.06328 524 9944.5 10206
NPHI MWD050 PU 15.36 51.47 27.3062 525 9933.5 10195.5
FCNT MWD050 CP30 573 891.12 720.908 547 9922.5 10195.5
NCNT MWD050 CP30 2370.49 3225.66 2708.8 525 9933.5 10195.5
CALA MWD050 IN 9.42 11.13 10.416 525 9926.5 10188.5
First Reading For Entire File. ........ .9922.5
Last Reading For Entire File.. "'" ... .10281
File Trailer
Service name...... .,. ... .STSLIB.006
Service Sub Level Name...
Version Number.... ... ... .1.0.0
Date of Generation... ... .02/06/24
Maximum Physical Record..65535
File Type.... ......,... ..LO
Next File Name........ ...STSLIB.007
Physical EOF
File Header
Service name......... ... .STSLIB.007
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/06/24
Maximum Physical Record..65535
File Type..... .....,.... .LO
Previous File Name...... .STSLIB.006
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
FCNT
NCNT
NPHI
PEF
FET
RPX
RPS
RPM
RPD
RHOB
DRHO
GR
ROP
$
7
header data for each bit run in separate files.
6
.5000
START DEPTH
10190.0
10196.0
10196.0
10206.5
10239.5
10239.5
10239.5
10239.5
10239.5
10244.0
10244.0
10247.0
10281. 5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
11250.0
11250.0
11249.5
10312.0
11293.5
11293.5
11293.5
11293.5
11293.5
10312.0
10312.0
11286.5
10312.0
17-NOV-01
Insite
66.16
Memory
10312.0
10281. 0
10312.0
60.9
87.8
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CTN COMP THERMAL NEUTRON
TOOL NUMBER
Ii
'I(
.(
SLD STABILIZED LITHO DEN
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RES IS. 4
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SI ZE (IN): 13.500
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
LSND
8.90
49.0
9.7
300
5.7
1.900
1.060
2.600
1.420
65.0
122.0
65.0
65.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record............ .Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD060 FPH 4 1 68 4 2
GR MWD060 API 4 1 68 8 3
RPX MWD060 OHMM 4 1 68 12 4
RPS MWD060 OHMM 4 1 68 16 5
RPM MWD060 OHMM 4 1 68 20 6
RPD MWD060 OHMM 4 1 68 24 7
FET MWD060 HRS 4 1 68 28 8
RHOB MWD060 G/CC 4 1 68 32 9
DRHO MWD060 GICC 4 1 68 36 10
PEF MWD060 BIE 4 1 68 40 11
NPHI MWD060 PU 4 1 68 44 12
FCNT MWD060 CP30 4 1 68 48 13
NCNT MWD060 CP30 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10190 11293.5 10741. 8 2208 10190 11293.5
ROP MWD060 FPH 4.87 74.27 49.6984 62 10281. 5 10312
GR MWD060 API 39.23 149.08 78.5627 314 10247 11286.5
RPX MWD060 OHMM 1. 91 343.3 24.4724 342 10239.5 11293.5
RPS MWD060 OHMM 0.99 88.02 26.616 342 10239.5 11293.5
RPM MWD060 OHMM 2.45 2000 226.173 342 10239.5 11293.5
RPD MWD060 OHMM 2.76 2000 280.866 342 10239.5 11293.5
FET MWD060 HRS 2.02 79.7 22.0979 342 10239.5 11293.5
RHOB MWD060 GICC 1. 68 3.65 2.49328 137 10244 10312
DRHO MWD060 G/CC -0.75 0.99 0.0467883 137 10244 10312
PEF MWD060 BIE 3.24 13.82 8.96646 212 10206.5 10312
:1,
NPHI MWD060 PU
FCNT MWD060 CP30
NCNT MWD060 CP30
16.14
111.3
14038.8
:1,
50.6
676.5
29420.6
36.6347
313.765
21940.7
11249.5
11250
11250
341
2114
2103
10196
10190
10196
First Reading For Entire File....... ...10190
Last Reading For Entire File........ ...11293.5
File Trailer
Service name.. ...., ..... .STSLIB.007
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation..... ..02/06/24
Maximum Physical Record..65535
File Type.............. ..LO
Next File Name.. ....... ..STSLIB.008
Physical EOF
File Header
Service name............ .STSLIB.008
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/06/24
Maximum Physical Record..65535
File Type............... .LO
Previous File Name...... .STSLIB.007
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
FCNT
RHOB
DRHO
RPM
NCNT
ROP
RPS
RPD
FET
PEF
NPHI
RPX
GR
$
8
header data for each bit run in separate files.
7
.5000
START DEPTH
10250.0
10267.0
10267.0
10312.5
10312.5
10312.5
10312.5
10312.5
10312.5
10312.5
10312.5
10312.5
10313.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
CTN
SLD
DGR
EWR4
STOP DEPTH
12146.5
11504.0
11504.0
12190.5
12147.0
12240.0
12190.5
12190.5
12190.5
11531.5
12146.5
12190.5
12183.5
20-NOV-01
Insite
66.16
Memory
12240.0
10312.0
12240.0
60.1
94.8
BOTTOM)
TOOL TYPE
COMP THERMAL NEUTRON
STABILIZED LITHO DEN
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
TOOL NUMBER
~,
It
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
13.500
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
Baradriln
8.80
49.0
9.8
800
5.1
.150
.083
.510
.400
69.0
130.0
69.0
69.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type................ ..0
Data Specification Block Type.....O
Logging Direction............ .... . Down
Optical log depth units...... .... .Feet
Data Reference Point..... ...... ...Undefined
Frame Spacing............. ...... ..60 .1IN
Max frames per record............ .Undefined
Absent value..................... .-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD070 FPH 4 1 68 4 2
GR MWD070 API 4 1 68 8 3
RPX MWD070 OHMM 4 1 68 12 4
RPS MWD070 OHMM 4 1 68 16 5
RPM MWD070 OHMM 4 1 68 20 6
RPD MWD070 OHMM 4 1 68 24 7
FET MWD070 HRS 4 1 68 28 8
RHOB MWD070 GICC 4 1 68 32 9
DRHO MWD070 GICC 4 1 68 36 10
PEF MWD070 B/E 4 1 68 40 11
NPHI MWD070 PU 4 1 68 44 12
FCNT MWD070 CP30 4 1 68 48 13
NCNT MWD070 CP30 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10250 12240 11245 3981 10250 12240
ROP MWD070 FPH 3.65 494.29 96 .1197 3856 10312.5 12240
GR MWD070 API 39.11 127.21 69.8668 3742 10313 12183.5
RPX MWD070 OHMM 0.29 2000 119.587 3757 10312.5 12190.5
RPS MWD070 OHMM 0.51 1735.16 169.478 3757 10312.5 12190.5
RPM MWD070 OHMM 1. 24 1324.64 125.74 3757 10312.5 12190.5
RPD MWD070 OHMM 1. 05 2000 251.59 3757 10312.5 12190.5
FET MWD070 HRS 0.3 77.06 1.13355 3757 10312.5 12190.5
RHOB MWD070 G/CC 1.942 3.261 2.62741 2475 10267 11504
DRHO MWD070 G/CC -0.554 1.013 0.108629 2475 10267 11504
PEF MWD070 BIE 1. 07 16.85 5.62476 2439 10312.5 11531.5
NPHI MWD070 PU 20.29 45.18 37.052 3669 10312.5 12146.5
FCNT MWD070 CP30 122.4 635.5 254.322 3794 10250 12146.5
NCNT MWD070 CP30 18097.4 30523.7 20677.2 3670 10312.5 12147
~
First Reading For Entire File......... .10250
Last Reading For Entire File......... ..12240
File Trailer
Service name.. ... ...... ..STSLIB.008
Service Sub Level Name...
Version Number..... .... ..1.0.0
Date of Generation..... ..02/06/24
Maximum Physical Record..65535
File Type............... .LO
Next File Name.... ..... ..STSLIB.009
Physical EOF
Tape Trailer
Service name. ........... .LISTPE
Date.....................02/06/24
Origin...................STS
Tape Name.............. ..UNKNOWN
Continuation Number... ...01
Next Tape Name........ ...UNKNOWN
Comments.................STS LIS
Writing Library.
Reel Trailer
Service name...... ...... .LISTPE
Date.....................02/06/24
Origin...................STS
Reel Name.. ............. . UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS
Writing Library.
Physical EOF
Physical EOF
End Of LIS File
.,
II
"
Scientific Technical Services
Scientific Technical Services
," ,
(
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Mon Jun 2416:11:37 2002
Reel Header
Service name........... ..LISTPE
Date.....................02/06/24
Origin...................STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Previous Reel Name.. .... . UNKNOWN
Comments..... .......... ..STS LIS
Tape Header
Service name........ .... .LISTPE
Date.....................02/06/24
Origin...................STS
Tape Name... ............ . UNKNOWN
Continuation Number..... .01
Previous Tape Name.. ..,. . UNKNOWN
Comments................ .STS LIS
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
,.:'1.,:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
#
REMARKS:
MWD RUN 1
AK-MM-11180
J. MARTIN
L. VAUGHAN
MWD RUN 4
AK-MM-11180
H. COOMANSIN
A. MADSEN
MSL 0)
OPEN HOLE
BIT SIZE (IN)
13.500
9.875
6.750
Writing Library.
Writing Library.
E-103 PB1
500292304570
BP Exploration
Sperry Sun
24-JUN-02
MWD RUN 2
AK-MM-11180
J. MARTIN
L. VAUGHAN
MWD RUN 5
AK-MM-11180
R. MCNEILL
A. MADSEN
6
11N
14E
4889
501
.00
63.68
29.20
CASING
SIZE (IN)
20.000
10.750
7.625
DRILLERS
DEPTH (FT)
4506.0
10281. 0
11342.0
,
~.
a O)~d. ðO
I Og(o~
Scientific Technical Services
Scientific Technical Services
(Alaska) I Inc.
MWD RUN 3
AK-MM-11180
J. MARTIN
A. MADSEN
MWD RUN 6
AK-MM-11180
R. MCNEILL
A. MADSEN
1.
ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
File Header
It
l
NOTED.
2.
ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTHS (TVD).
3. MWD RUNS 1-2 ARE DIRECTIONAL WITH NATURAL GAMMA
PROBE (NGP)
UTILIZING SCINTILLATION DETECTORS.
4.
MWD RUN 3 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR)
UTILIZING GEIGER-MULLER TUBE DETECTORS.
5. MWD RUNS 4-5 ARE DIRECTIONAL WITH DGR,
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR-4), STABILIZED
LITHO-DENSITY (SLD),
COMPENSATED NEUTRON POROSITY (CNP) AND ACOUSTIC
CALIPER (ACAL).
6.
MWD RUNS 6-7 ARE DIRECTIONAL WITH DGR, EWR-4, SLD,
AND COMPENSATED THERMAL NEUTRON POROSITY (CTN).
7. MWD RUN 6 IS A PILOT HOLE, WITH WELLBORE DESIGNATED
PBl.
DURING MWD RUN 7, E-103 KICKS OFF FROM E-103 PB1 AT
CEMENT PLUG WITH TOP SET AT 10312' MD, 8012' TVD.
8.
DEPTH-SHIFTING IS WAIVED PER THE E-MAIL OF 12/5/2001
OF D. SCHNORR OF BP EXPLORATION (ALASKA) INC.
9. MWD RUNS 1-6 REPRESENT THE MWD DATA FOR WELL E-103
PB1 WITH
API# 50-029-23045-70. THIS WELL REACHED A TOTAL
DEPTH
(TD) OF 11342' MD, 8147' TVD.
SROP = SMOOTHED RATE OF PENETRATION
SGRD = SMOOTHED GAMMA RAY - SCINTILLATION DETECTORS
SGRC = SMOOTHED GAMMA RAY - GEIGER-MULLER TUBE DETECTORS
SEXP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( EXTRA
SHALLOW SPACING)
SESP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
SHALLOW SPACING)
SEMP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( MEDIUM
SPACING)
SEDP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( DEEP
SPACING)
SFXE = SMOOTHED FORMATION EXPOSURE TIME
SBD2 = SMOOTHED BULK DENSITY (LOW-COUNT BIN)
SCO2 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN)
SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR
(LOW-COUNT BIN)
TNPS = SMOOTHED THERMAL NEUTRON POROSITY
(SANDSTONE MATRIX, FIXED HOLE SIZE)
SPSF = SMOOTHED COMPENSATED NEUTRON POROSITY
(SANDSTONE MATRIX, HOLE SIZE MEASURED BY ACOUSTIC
CALIPER)
PARAMETERS USED IN NEUTRON / POROSITY LOG CALCULATIONS:
HOLE SIZE: 9.875 (MEASURED) AND 6.75" (FIXED)
MUD WEIGHT: 8.8 - 10.7 PPG
MUD FILTRATE SALINITY: 150 - 800 PPM CHLORIDE
FORMATION WATER SALINITY: 50,000 PPM CHLORIDE
FLUID DENSITY: 1.0 G/CC
MATRIX DENSITY: 2.65 G/CC
LITHOLOGY: SANDSTONE
$
('
i(
Service name........... ..STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/06/24
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name..... ..STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
SGRD
SROP
SEXP
SESP
SEMP
SEDP
SFXE
ACAL
SPSF
SNFA
SNNA
SNP2
SC02
SBD2
$
1
clipped curves; all bit runs merged.
.5000
START DEPTH
70.0
114.0
4459.0
4459.0
4459.0
4459.0
4459.0
6579.0
6586.0
6586.0
6586.0
6596.5
6596.5
6596.5
STOP DEPTH
11286.5
11342.0
11293.5
11293.5
11293.5
11293.5
11293.5
10188.5
11249.5
11250.0
11250.0
11265.0
11265.0
11265.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED
PBU
MWD
MWD
MWD
MWD
MWD
MWD
$
DATA SOURCE
TOOL CODE
#
REMARKS:
BIT RUN NO
1
2
3
4
5
6
MERGED MAIN PASS.
$
MERGE TOP
70.0
2504.0
4506.0
6737.0
10017.0
10281. 0
MERGE BASE
2504.0
4506.0
6737.0
10017.0
10281. 0
11342.0
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type. ....0
Logging Direction............ ... ..Down
Optical log depth units..... ..... .Feet
Data Reference Point............. .Undefined
Frame Spacing.....................60 .lIN
Max frames per record............ .Undefined
Absent value............ ........ ..-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FPH 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HRS 4 1 68 28 8
RHOB MWD G/CC 4 1 68 32 9
DRHO MWD G/CC 4 1 68 36 10
PEF MWD BIE 4 1 68 40 11
~
~:
NPHI MWD
FCNT MWD
NCNT MWD
CALA MWD
PU
CP30
CP30
IN
4
4
4
4
1
1
1
1
68
68
68
68
44
48
52
56
12
13
14
15
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 70 11342 5706 22545 70 11342
ROP MWD FPH 0 1026.31 188.181 22457 114 11342
GR MWD API 8.24 325.8 75.1434 22434 70 11286.5
RPX MWD OHMM 0.65 1949.43 44.139 13 670 4459 11293.5
RPS MWD OHMM 0.67 1936.89 35.6573 13670 4459 11293.5
RPM MWD OHMM 0.68 2000 35.5598 13 67 0 4459 11293.5
RPD MWD OHMM 0.71 2000 53.528 13670 4459 11293.5
FET MWD HRS 0.09 79.7 1.9072 13 670 4459 11293.5
RHOB MWD G/CC 1. 68 3.731 2.40487 9263 6596.5 11265
DRHO MWD G/CC -0.75 1.373 0.0828934 9263 6596.5 11265
PEF MWD B/E 1.18 13.82 3.36657 9338 6596.5 11265
NPHI MWD PU 2.6 51. 47 24.0244 9328 6586 11249.5
FCNT MWD CP30 111.3 1147 576.7 9324 6586 11250
NCNT MWD CP30 2128 29420.6 7063.94 9323 6586 11250
CALA MWD IN 9.3 12.18 10.3913 7220 6579 10188.5
First Reading For Entire File......... .70
Last Reading For Entire File... ....... .11342
File Trailer
Service name.... ........ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/06/24
Maximum Physical Record. .65535
File Type. .............. .LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/06/24
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
header data for each bit run in separate files.
1
.5000
START DEPTH
70.0
114.0
STOP DEPTH
2460.0
2504.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
04-NOV-01
Insite
66.16
Memory
2504.0
114.0
2504.0
I~
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction........ ........ . Down
Optical log depth units.......... .Feet
Data Reference Point......... .... .Undefined
Frame Spacing.. ........... ....... .60 .1IN
Max frames per record.... ........ .Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD010
GR MWD010
.0
42.2
TOOL NUMBER
PB02100HWRG6
13.500
Spud Mud
9.30
360.0
9.0
250
10.2
.000
.000
.000
.000
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FPH 4 1 68 4 2
API 4 1 68 8 3
Name Service Unit
DEPT FT
ROP MWD010 FPH
GR MWD010 API
Min
70
0
18.53
Max
2504
1026.31
116.18
First Reading For Entire File......... .70
Last Reading For Entire File.......... .2504
File Trailer
Service name...... ... ... .STSLIB.002
Service Sub Level Name...
Version Number..... ..... .1.0.0
Date of Generation.... ...02/06/24
Maximum Physical Record. .65535
File Type........... .... .LO
Next File Name.......... .STSLIB.003
Mean Nsam
1287 4869
188.792 4781
59.5569 4781
i(
.0
70.0
.0
.0
First
Reading
70
114
70
Last
Reading
2504
2504
2460
~
Physical EOF
File Header
Service name.. """,.. ..STSLIB.003
Service Sub Level Name...
Version Number... ..... ...1.0.0
Date of Generation...... .02/06/24
Maximum Physical Record..65535
File Type............... .LO
Previous File Name...... .STSLIB.002
Comment Record
FI LE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
3
l
header data for each bit run in separate files.
2
.5000
START DEPTH
2460.5
2504.5
STOP DEPTH
4462.0
4506.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
05-NOV-01
Insite
66.16
Memory
4506.0
2504.0
4506.0
41. 6
46.1
TOOL NUMBER
PB02100HWRG6
13.500
Spud Mud
9.40
315.0
9.1
250
7.0
.000
.000
.000
.000
.0
82.6
.0
.0
(
'\'"
'~
Data Specification Block Type.....O
Logging Direction.... ...... ...... . Down
Optical log depth units... ....... .Feet
Data Reference Point....... ..... ..Undefined
Frame Spacing.....................60 .lIN
Max frames per record...... ....,. .Undefined
Absent value............... ..... ..-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD020
GR MWD020
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FPH 4 1 68 4 2
API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 2460.5 4506 3483.25 4092 2460.5 4506
ROP MWD020 FPH 11.78 906.52 216.907 4004 2504.5 4506
GR MWD020 API 22.79 148.16 85.6051 4004 2460.5 4462
First Reading For Entire File......... .2460.5
Last Reading For Entire File.......... .4506
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation.. .... .02/06/24
Maximum Physical Record. .65535
File Type............... .LO
Next File Name....... ... .STSLIB.004
Physical EOF
File Header
Service name........ .... .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/06/24
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPX
RPS
RPM
FET
RPD
GR
ROP
$
4
header data for each bit run in separate files.
3
.5000
START DEPTH
4459.0
4459.0
4459.0
4459.0
4459.0
4462.5
4506.5
STOP DEPTH
6689.0
6689.0
6689.0
6689.0
6689.0
6697.0
6737.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
08-NOV-01
Insite
66.16
Memory
6737.0
:1
\
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
EWR4
DGR
$
BOTTOM)
TOOL TYPE
ELECTROMAG. RESIS. 4
DUAL GAMMA RAY
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF ,( IN) :
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction........ ........ . Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record. ,.",.".. ..Undefined
Absent value.................... ..-999
Depth Units.......................
Datum Specification Block sub-type...O
~:'
4506.0
6737.0
39.1
45.8
TOOL NUMBER
PB02100HWRG6
PB02100HWRG6
13.500
LSND
9.50
52.0
9.0
300
6.2
2.600
1.630
5.000
8.000
65.0
107.6
65.0
65.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FPH 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HRS 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 4459 6737 5598 4557 4459 6737
ROP MWD030 FPH 9.13 991.51 274.729 4462 4506.5 6737
GR MWD030 API 8.24 124.48 64.13 6 4470 4462.5 6697
RPX MWD030 OHMM 0.76 61. 23 3.41969 4461 4459 6689
RPS MWD030 OHMM 0.81 1162.71 5.13798 4461 4459 6689
RPM MWD030 OHMM 0.69 2000 14.5705 4461 4459 6689
RPD MWD030 OHMM 0.71 2000 14.5783 4461 4459 6689
FET MWD030 HRS 0.09 60.63 1.71075 4461 4459 6689
'I'
~t
First Reading For Entire File.... ......4459
Last Reading For Entire File......... ..6737
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/06/24
Maximum Physical Record. .65535
File Type......... ...... .LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Service name........... ..STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/06/24
Maximum Physical Record. .65535
File Type.. ............. .LO
Previous File Name...... .STSLIB.004
Comment Record
FI LE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
CALA
NCNT
FCNT
NPHI
PEF
DRHO
RHOB
FET
RPD
RPM
RPS
RPX
GR
ROP
$
5
~,
header data for each bit run in separate files.
4
.5000
START DEPTH
6579.0
6586.0
6586.0
6586.0
6596.5
6596.5
6596.5
6689.5
6689.5
6689.5
6689.5
6689.5
6697.5
6737.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
CNP
SLD
EWR4
DGR
$
#
STOP DEPTH
9926.0
9933.0
9933.0
9933.0
9944.0
9944.0
9944.0
9976.5
9976.5
9976.5
9976.5
9976.5
9984.0
10017 . 0
BOTTOM)
TOOL TYPE
COMPENSATED NEUTRON
STABILIZED LITHO DEN
ELECTROMAG. RESIS. 4
DUAL GAMMA RAY
BOREHOLE AND CASING DATA
ll-NOV-01
Insite
66.16
Memory
10018.0
6737.0
10018.0
38.5
47.1
TOOL NUMBER
PB02100HWRG6
PB02100HWRG6
PBO2100HWRG6
PB02100HWRG6
i'
1\
{'
OPEN HOLE BIT SIZE (IN):
DRILLER1S CASING DEPTH (FT):
13.500
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
LSND
9.70
50.0
9.0
150
5.0
1. 200
.670
1.400
1. 800
68.0
127.0
68.0
68.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction............... ..Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing. ................... .60 .1IN
Max frames per record............ .Undefined
Absent value..................... .-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FPH 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
RPX MWD040 OHMM 4 1 68 12 4
RPS MWD040 OHMM 4 1 68 16 5
RPM MWD040 OHMM 4 1 68 20 6
RPD MWD040 OHMM 4 1 68 24 7
FET MWD040 HRS 4 1 68 28 8
RHOB MWD040 G/CC 4 1 68 32 9
DRHO MWD040 G/CC 4 1 68 36 10
PEF MWD040 BIE 4 1 68 40 11
NPHI MWD040 PU 4 1 68 44 12
FCNT MWD040 CP30 4 1 68 48 13
NCNT MWD040 CP30 4 1 68 52 14
CALA MWD040 IN 4 1 68 56 15
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 6579 10017 8298 6877 6579 10017
ROP MWD040 FPH 0 1720.83 170.558 6560 6737.5 10017
GR MWD040 API 23.63 256.33 87.6267 6574 6697.5 9984
RPX MWD040 OHMM 0.65 12.43 3.17953 6575 6689.5 9976.5
RPS MWD040 OHMM 0.67 12.97 3.18395 6575 6689.5 9976.5
RPM MWD040 OHMM 0.68 11.22 3.22314 6575 6689.5 9976.5
RPD MWD040 OHMM 0.71 10.82 3.23601 6575 6689.5 9976.5
FET MWD040 HRS 0.13 19.55 0.906029 6575 6689.5 9976.5
RHOB MWD040 G/CC 1.889 3.731 2.35533 6696 6596.5 9944
DRHO MWD040 G/CC -0.153 1. 373 0.0735694 6696 6596.5 9944
PEF MWD040 BIE 1.18 9.41 2.68683 6696 6596.5 9944
NPHI MWD040 PU 2.6 48.99 20.8933 6695 6586 9933
FCNT MWD040 CP30 426 1147 647.372 6695 6586 9933
NCNT MWD040 CP30 2128 3705.93 2732.44 6695 6586 9933
CALA MWD040 IN 9.3 12.18 10.3894 6695 6579 9926
,I
\
First Reading For Entire File......... .6579
Last Reading For Entire File.......... .10017
File Trailer
Service name. ........ ... .STSLIB.005
Service Sub Level Name...
Version Number..... ..... .1.0.0
Date of Generation...... .02/06/24
Maximum Physical Record. .65535
File Type.... ........ ....LO
Next File Name...... .... .STSLIB.006
Physical EOF
File Header
Service name............ .STSLIB.006
Service Sub Level Name...
Version Number........ ...1.0.0
Date of Generation...... .02/06/24
Maximum Physical Record. .65535
File Type........... .... .LO
Previous File Name...... .STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
FCNT
CALA
NPHI
NCNT
RHOB
DRHO
PEF
FET
RPX
RPS
RPM
RPD
GR
ROP
$
6
'I
~
header data for each bit run in separate files.
5
.5000
START DEPTH
9922.5
9926.5
9933.5
9933.5
9944.5
9944.5
9944.5
9977.0
9977.0
9977.0
9977.0
9977.0
9984.5
10017.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
CNP
SLD
EWR4
DGR
$
#
STOP DEPTH
10195.5
10188.5
10195.5
10195.5
10206.0
10206.0
10206.0
10239.0
10239.0
10239.0
10239.0
10239.0
10246.5
10281.0
BOTTOM)
TOOL TYPE
COMPENSATED NEUTRON
STABILIZED LITHO DEN
ELECTROMAG. RESIS. 4
DUAL GAMMA RAY
BOREHOLE AND CASING DATA
12-NOV-01
Insite
66.16
Memory
10281.0
10018.0
10281. 0
51. 4
59.5
TOOL NUMBER
PB02100HWRG6
PB02100HWRG6
PB02100HWRG6
PB02100HWRG6
\(
{
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
13 . 500
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
LSND
10.70
53.0
9.2
200
4.0
1.300
.725
1.400
1.900
65.0
122.0
65.0
65.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction...... ......... ..Down
Optical log depth units......... ..Feet
Data Reference Point.. ........... .Undefined
Frame Spacing................ .... .60 .1IN
Max frames per record............ .Undefined
Absent value.................... ..-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD050 FPH 4 1 68 4 2
GR MWD050 API 4 1 68 8 3
RPX MWD050 OHMM 4 1 68 12 4
RPS MWD050 OHMM 4 1 68 16 5
RPM MWD050 OHMM 4 1 68 20 6
RPD MWD050 OHMM 4 1 68 24 7
FET MWD050 HRS 4 1 68 28 8
RHOB MWD050 G/CC 4 1 68 32 9
DRHO MWD050 G/CC 4 1 68 36 10
PEF MWD050 BIE 4 1 68 40 11
NPHI MWD050 PU 4 1 68 44 12
FCNT MWD050 CP30 4 1 68 48 13
NCNT MWD050 CP30 4 1 68 52 14
CALA MWD050 IN 4 1 68 56 15
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9922.5 10281 10101. 8 718 9922.5 10281
ROP MWD050 FPH 0.84 412.81 34.9898 528 10017.5 10281
GR MWD050 API 44.59 325.8 153.797 525 9984.5 10246.5
RPX MWD050 OHMM 2.25 7.03 3.86032 525 9977 10239
RPS MWD050 OHMM 2.08 6.87 3.94731 525 9977 10239
RPM MWD050 OHMM 1. 98 6.89 4.16099 525 9977 10239
RPD MWD050 OHMM 2.14 6.94 4.1301 525 9977 10239
FET MWD050 HRS 1. 08 18.36 4.22394 525 9977 10239
RHOB MWD050 G/CC 1. 988 2.719 2.38943 524 9944.5 10206
DRHO MWD050 G/CC -0.072 0.535 0.134983 524 9944.5 10206
PEF MWD050 BIE 2.86 9.39 5.06328 524 9944.5 10206
NPHI MWD050 PU 15.36 51.47 27.3062 525 9933.5 10195.5
FCNT MWD050 CP30 573 891.12 720.908 547 9922.5 10195.5
NCNT MWD050 CP30 2370.49 3225.66 2708.8 525 9933.5 10195.5
CALA MWD050 IN 9.42 11.13 10.416 525 9926.5 10188.5
First Reading For Entire File......... .9922.5
Last Reading For Entire File.......... .10281
File Trailer
Service name....... ..... .STSLIB.006
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation... ... .02/06/24
Maximum Physical Record..65535
File Type. .... .......... .LO
Next File Name.......... .STSLIB.007
Physical EOF
File Header
Service name............ .STSLIB.007
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/06/24
Maximum Physical Record..65535
File Type..... .......... .LO
Previous File Name...... .STSLIB.006
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
FCNT
NCNT
NPHI
PEF
RPS
RPX
RPM
RPD
FET
RHOB
DRHO
GR
ROP
$
7
it
header data for each bit run in separate files.
6
.5000
START DEPTH
10190.0
10196.0
10196.0
10206.5
10239.5
10239.5
10239.5
10239.5
10239.5
10244.0
10244.0
10247.0
10281. 5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
CTN
SLD
DGR
EWR4
$
#
STOP DEPTH
11250.0
11250.0
11249.5
11265.0
11293.5
11293.5
11293.5
11293.5
11293.5
11265.0
11265.0
11286.5
11342.0
BOTTOM)
TOOL TYPE
COMP THERMAL NEUTRON
STABILIZED LITHO DEN
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
17-NOV-01
Insite
66.16
Memory
11342.0
10281.0
11342.0
60.9
87.8
TOOL NUMBER
PB02100HWRG6
PB02100HWRG6
PB02100HWRG6
PB02100HWRG6
13 . 500
(
;'~
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
LSND
8.90
49.0
9.7
300
5.7
1.900
1.060
2.600
1. 420
65.0
122.0
65.0
65.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..... ......... ....0
Data Specification Block Type.....O
Logging Direction.......... ...... . Down
Optical log depth units... ...... ..Feet
Data Reference Point............ ..Undefined
Frame Spacing............... ..... .60 .1IN
Max frames per record............ .Undefined
Absent value.......... .... ....... .-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 a 1
ROP MWD060 FPH 4 1 68 4 2
GR MWD060 API 4 1 68 8 3
RPX MWD060 OHMM 4 1 68 12 4
RPS MWD060 OHMM 4 1 68 16 5
RPM MWD060 OHMM 4 1 68 20 6
RPD MWD060 OHMM 4 1 68 24 7
FET MWD060 HRS 4 1 68 28 8
RHOB MWD060 G/CC 4 1 68 32 9
DRHO MWD060 G/CC 4 1 68 36 10
PEF MWD060 BIE 4 1 68 40 11
NPHI MWD060 PU 4 1 68 44 12
FCNT MWD060 CP30 4 1 68 48 13
NCNT MWD060 CP30 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10190 11342 10766 2305 10190 11342
ROP MWD060 FPH 4.08 236.15 45.754 2122 10281. 5 11342
GR MWD060 API 29.02 149.08 55.1796 2080 10247 11286.5
RPX MWD060 OHMM 1. 91 1949.43 267.991 2109 10239.5 11293.5
RPS MWD060 OHMM 0.99 1936.89 209.344 2109 10239.5 11293.5
RPM MWD060 OHMM 2.45 2000 188.585 2109 10239.5 11293.5
RPD MWD060 OHMM 2.76 2000 305.002 2109 10239.5 11293.5
FET MWD060 HRS 0.79 79.7 4.8673 2109 10239.5 11293.5
RHOB MWD060 GICC 1. 68 3.65 2.5712 2043 10244 11265
DRHO MWD060 G/CC -0.75 0.99 0.100093 2043 10244 11265
PEF MWD060 B/E 1. 77 13.82 5.09577 2118 10206.5 11265
NPHI MWD060 PU 16.14 50.6 33.1514 2108 10196 11249.5
FCNT MWD060 CP30 111.3 676.5 313.765 2114 10190 11250
NCNT MWD060 CP30 14038.8 29420.6 21940.7 2103 10196 11250
First Reading For Entire File........ ..10190
Last Reading For Entire File......... ..11342
it
File Trailer
Service name... ........ ..STSLIB.007
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation... ... .02/06/24
Maximum Physical Record. .65535
File Type................LO
Next File Name......... ..STSLIB.008
Physical EOF
Tape Trailer
Service name............ .LISTPE
Date.....................02/06/24
Origin...................STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Next Tape Name......... ..UNKNOWN
Comments................ .STS LIS
Writing Library.
Reel Trailer
Service name............ .LISTPE
Date.....................02/06/24
Origin...................STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Next Reel Name......... ..UNKNOWN
Comments................ .STS LIS
Writing Library.
Physical EOF
Physical EOF
End Of LIS File
{
Scientific Technical Services
Scientific Technical Services