Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout201-208CAUTION: This email originated from outside the State of Alaska mail system. Do not
click links or open attachments unless you recognize the sender and know the content
is safe.
From:Wallace, Chris D (OGC)
To:AOGCC Records (CED sponsored)
Subject:FW: NOT OPERABLE: Injector E-104 (PTD #2012080) will lapse on AOGCC MIT-IA
Date:Thursday, July 3, 2025 10:15:43 AM
From: PB Wells Integrity <PBWellsIntegrity@hilcorp.com>
Sent: Thursday, July 3, 2025 8:48 AM
To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>
Cc: Regg, James B (OGC) <jim.regg@alaska.gov>; Oliver Sternicki <Oliver.Sternicki@hilcorp.com>;
Torin Roschinger <Torin.Roschinger@hilcorp.com>; PB Wells Integrity
<PBWellsIntegrity@hilcorp.com>
Subject: NOT OPERABLE: Injector E-104 (PTD #2012080) will lapse on AOGCC MIT-IA
Mr. Wallace,
Injector E-104 (PTD # 2012080) is due for its 4-year AOGCC witnessed MIT-IA in July 2025. The are
no plans to have the well on injection and it will lapse on the MIT-IA. It is now classified as NOT
OPERABLE for tracking purposes.
Please respond with any questions.
Andy Ogg
Hilcorp Alaska LLC
Field Well Integrity
andrew.ogg@hilcorp.com
P: (907) 659-5102
M: (307) 399-3816
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility
is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
MEMORANDUM
TO: Jim Regg
P.I. Supervisor Ill -7�l Le(zez'l
FROM: Matt Herrera
Petroleum Inspector
NON -CONFIDENTIAL
State of Alaska
Alaska Oil and Cas Conservation Commission
DATE: Tuesday, July 13, 2021
SUBJECT: Mechanical Integrity Tests
Hilcorp North Slope, LLC
E-104
PRUDHOE BAY UN MDS E-104
Src: Inspector
Reviewed By:
P.I. Supry Ilj
Comm
Well Name PRUDHOE BAY UN MDS E-104 API Well Number 50-029-23049-00-00 Inspector Name: Matt Herrera
Permit Number: 201-208-0 Inspection Date: 7/4/2021 -
Insp Num: mitMFH210704150203
Rel Insp Num:
Packer Depth Pretest Initial
15 Min 30 Min 45 Min 60 Min
Well E 1�
Type Inj
�'
TVD
7826 -
Tubing
2101
2077
2077 _
2099
2100 -
—
pTI) 2012080
Type Test
SPT
Test psi
1956
IA
510
2900 -
2863 _
2862 _
2860
BBL Pumped:
2 9
BBL Returned:
2.7
OA
161
163
163
163
163
Intervals 4YRTST p/F P
Notes: MIT -IA performed to 2900PS1 Per operator Test time ran out additional 15 minutes to verify IA pressure loss with unstable FTP
1� I1i�,t `i 1- S ! •1,CZ SC Q�`'•c{-yC.' �J � �
Tuesday, July 13, 2021 Page I of 1
Wallace, Chris D (CED)
From: Alaska NS - PB - Field Well Integrity <PBFieldWelllntegrity@hilcorp.com>
Sent: Saturday, May 22, 2021 3:18 PM
To: Wallace, Chris D (CED)
Cc: Regg, James B (CED); Stan Golis; Aras Worthington; Oliver Sternicki
Subject: OPERABLE: Injector E-104 (PTD #2012080) Ready for injection
Mr Wallace,
Injector E-104 (PTD #2012080) is now operationally ready to be placed on water injection. The well is now classified as
OPERABLE and an AOGCC MIT -IA will be completed when the well is thermally stable.
Please call with any questions or concerns.
Ryan Holt
Hilcorp Alaska LLC
Field Well Integrity / Compliance
RVan.Holt@Hilcorp.com
P: (907) 659-5102
M:(907)232-1005
From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com>
Sent: Monday, June 25, 2018 2:18 PM
To: 'ch ris.wa I lace @a laska.gov' <chris.waIlace@alaska.gov>; AK, OPS EOC Specialists <AKOPSEOCSpecialists@bp.com>;
AK, OPS GC1 Facility OTL <AKOPSGC1FacilityOTL@bp.com>; AK, OPS GCl Field O&M TL
<AKOPSGC1FieldOMTL2@bp.com>; AK, OPS GCl OSM <AKOPSGC10SM@bp.com>; AK, OPS GCl Wellpad Lead
<AKOPSGC1WellpadLead@bp.com>; AK, OPS PCC Ops Lead <AKOPSPCCOpsLead@bp.com>; AK, OPS Prod Controllers
<akopsprodcontrollersl@bp.com>; AK, OPS Well Pad DG <AKOPSWellPadDG@bp.com>; AK, OPS Well Pad EKG
<AKOPSWellPad EKG @bp.com>; AK, OPS Well Pad YP <AKOPSWellPadYP@bp.com>; Ak, Ops West Area TL
<AkOpsWestAreaTL@bp.com>; AK, RES GPB East Wells Opt Engr<AKRESGPBEastWellsOptEngr@bp.com>; AK, RES GPB
West Wells Opt Engr <AKRESGPBWestWellsOpt2@bp.com>; AKOpsProdEOCTL <AKOPSPCCEOCTL@bp.com>; Alatalo,
Travis <Travis.Alatalo@bp.com>; Cerveny, Philip F <Philip.Cerveny@bp.com>; Derrick, Laurie R
<Laurie.Derrick@bp.com>; Haffener, Jordan <Jordan.Haffener@bp.com>; Oshiro, Joleen <JOLEEN.OSHIRO@bp.com>
Cc: 'Regg, James B (DOA) (jim.regg@alaska.gov)' <jim.regg@alaska.gov>; AK, GWO Completions Well Integrity
<AKDCWLCompletionsSupt@bp.com>; AK, GWO DHD Well Integrity <AKD&CDHDWelllntegri@bp.com>; AK, GWO
Projects Well Integrity<AKDCProjectsWelllntegrityEngineer@bp.com>; AK, GWO SUPT Well Integrity
<AKDCWellintegrityCoordinator@bp.com>; AK, GWO Well Integrity Well Information <akgwowellintegritywe@bp.com>;
AK, OPS FF Well Ops Comp Rep <AKOPSFFWellOpsCompRep@bp.com>; AKIMS App User <akimsuser.service@bp.com>;
Cismoski, Doug A <CismosDA@BP.com>; Daniel, Ryan <Ryan.Daniel@bp.com>; Dempsey, David G
<David.Dempseyl@bp.com>; Dickerman, Eric <Eric.Dickerman@bp.com>; Hibbert, Michael
<Michael.Hibbert@BP.com>; Janowski, Carrie <Carrie.Janowski@bp.com>; Montgomery, Travis J
<Travis.Montgomery@bp.com>; Munk, Corey <Corey.Munk@bp.com>; Obrigewitch, Beau
<BEAU.OBRIGEWITCH@bp.com>; O'connor, Katherine <Katherine.O'connor@bp.com>; Romo, Louis A
<Louis.Romo@bp.com>; Sternicki, Oliver R <Oliver.Sternicki@bp.com>; Tempel, Joshua <Joshua.Tempel@bp.com>;
Worthington, Aras 1 <Aras.Worthington@bp.com>
Subject: NOT OPERABLE: Injector E-104 (PTD #2012080) Will lapse on AOGCC MIT -IA
0
WELL HISTORY FILE COVER PAGE
XHVZS
This page identifies oversize material and digital information available for this individual
Well History file and weather or not it is available in the LaserFiche file.
Please insure that it remains as the first page in this file.
~IJ/
é)-tl ~ Well History File #
Digital Data
0 CD's - #
0 DVD's - #
0 Diskettes - #
Added to LaserFiche File
0 Yes 0 No
0 Yes 0 No
0 Yes 0 No
Oversized Material
Added to LaserFiche File
0 Maps #
0 Mud Logs # -
0 Other #
0 Yes 0 No
0 Yes 0 No
0 Yes 0 No
General Notes or Comments about this file.
If any of the information listed above is not available in the LaserFiche file you may
contact the Alaska Oil & Gas Conservation Commission to request copies.
Please call Robin Deason at (907) 793-1225 if you have any questions or information
requests regarding this file.
• •
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Wednesday, July 14, 2010
TO: PtmS pgg isor ~~~~ ~(z(/'Cl0 SUBJECT: Mechanical Integrity Tests
BP EXPLORATION(ALASKA)INC
E-104
Fltoivt: Chuck Scheve PRUDHOE BAY UN NIDS E-104
Petroleum Inspector
Src: Inspector
ATn1V_(`nNRi71F.NTi A i .
Reviewed l
P.I. SuprvwF--
Comm
We11 Name: PRUDHOE BAY UN MDS E-t04 API Well Number: 50-029-23049-00-00
mitCS100714070033 Permit Number: 201-208-0
Insp Num:
Rel Insp Num: Inspector Name: Chuck Scheve
Inspection Date: 7/13/2010
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well
P.T.D E-104 'Type Inj.
2012080 TypeTCSt ~'
SPT TVD
Test psi 7826 '
1956 ~ IA
QA ~ 500
100 2190.
100 2160
100 2160
100
Interval 4YRTST _ p~ P - Tubing 1780 1780 1780 1780
Notes: pre-test pressures were observed for 30+ minutes and found stable. ~
Wednesday, July 14, 2010 Page 1 of 1
a~~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Mechanical Integrity Test
Email to:jim.regg~alaska.gov; phcebe.brooks~aYaska.gov; tom.maur>der~a~ska.gov; doa.aogcc.prudhce.bay~alaska.gov
OPERATOR:
FIELD /UNIT /PAD:
DATE:
OPERATOR REP:
AOGCC REP:
BP Exploration (Alaska), Inc.
Prudhoe Bay !PBU ! E-Pad
07/13710
Tiffany Quy
Chuck Scheve
Packer Pretest Initial 15 Min. 30 Min.
Well E-104 T In'. W TVD 7,826' Tu ' 1,780 1,780 1,784 1,780 Interval 4
P.T.D. 2012080 T test P Test 1956.5 . 500 2,190 2,160 2,160 P1F P
Notes: MIT-IA to 2100 for 4 year tJIC OA 100 100 100 100
Well T In'. TVD Tut>i Interval
P.T.D. T test Test P/F
Notes: OA
Well T In'. TVD Tu ' Interval
P.T.D. T test Test P/F
Notes: OA
Well T In'. TVD T Interval
P.T.D. T test Test C PIF
Notes: OA
Well T In . TVD T Irrterral
P.T.D. T test Test Cali PiF
Notes: OA
~~
TYPE INJ Codes TYPE TEST Codes -~, y~,~~i ~ ~~ ~ ~ R f } {~ ~ q INTERVAL Codes
~ ~~1;s;
D =Drilling Waste M =Annulus Moni~rmg ~ I =Initial Test
G =Gas P =Standard Pressure Test 4 =Four Year Cycle
I =Industrial Wastewater R = Intemal Radioactive Traces Survey V =Required by Variance
N =Not Injecting A =Temperature Aramaly Survey T =Test during Workover
W =Water D = DilFerential Temper~re Test O = Other (describe in notes)
MIT Report Form
BFL 11/27!07 MIT PBU E-104 07-13-t0.xls
MEMORANDUM
e
State of Alaska e
Alaska Oil and Gas Conservation Commission
TO:
J" R ,~ ¡,
lill egg hc?óû 7(ZSíD0
P.I. Supervisor '!!,
DATE: Wednesday, July 12, 2006
SUBJECT: Mechanical Integrity Tests
BP EXPLORATION (ALASKA) lNC
E-104
PRUDHOE BA Y UN MDS E-104
~OJ -;)J)g
FROM:
Jeff Jones
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I. Suprv,-Y;3i2--
Comm
NON-CONFIDENTIAL
Well Name: PRUDHOE BAY UN MDS E-104 API Well Number 50-029-23049-00-00 Inspector Name: Jeff Jones
Insp Num: mitlJ060711204738 Permit Number: 201-208-0 Inspection Date: 7/8/2006
ReI Insp Num
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well i E-I04 IType Inj. ¡ w i TVD 7826 i IA 450 2090 2065 2060 I ¡
, i
P.T. i 2012080 ITypeTest i SPT ¡ T~st psi 19565 I OA 200 200 200 200 i
I i
Interval 4YRTST P/F P v Tubing 2350 2350 2350 2350 i I
Notes 1 well house inspected; no exceptions noted. /'
iJ :)
Wednesday, July 12,2006 Page 1 of I
TREE"
Wa.LHEAD "
ACTUATOR"
KB. ELEV "
BF. ELEV =
KOP"
Max Ange "
Datum MD =
Datum TVO =
4-1/16" FMC
FM
NA
64.38'
25.11'
72fi
61 @ 5637'
N/A
8050' 55
E-104
SAFETY NOTES:
---i
985' H 9-5/8" TAM PORr COLLA R I
2190' 4-112" HES XNP, 10"3.813"
9-5/8" COO, 40#, L-80-MOD BTC, 10 = 8.835"
Minimum ID = 3,725" @ 12358'
4-1/2" H ES XN NIPPLE
4-112"1BG, 12.6#, L-80, .0152 bpf, 10 "3.958"
12369'
12292'
7" X 4-112" BKRS-3 PKR, ID = 3.875"
4-1/2" HES X NP, 10 = 3.813"
12313'
12337'
4-1/2" HES X NP, 10 = 3.813"
12358'
4-1/2" HES XN NIP, to = 3.725"
4-1/2" TIP, 12.6#, L-80, .0152 bpf, ID = 3.958"
12369'
12370' 4-1/2" WLEG, ID= 3.958"
12368' H8..MDTTLOGGED 12/11/01
ÆRFORA 1l0N SLMMð.RY
REF LOG: sws-usrr ON 12/11/01
ANGLEATTOPÆRF:50@12466'
Note: Refer to Production œ for historical erf data
SIZE SPF IN1ERVAL OpnlSqz DATE
3-318" 6 12500 -12520 0 02/11/02
3-318" 6 12466 - 12486 0 02/11/02
I 12439' H2O' RJP JT w/ RA RAG I
12581 '
12664'
12684'
DATE
12/14/01
12/28,101
02114/02
04126/02
04108103
09/17/03
REV BY COMIliENTS
ORIGINAL COMPLETION
CH/TP NBN WB.L
JRO'tlh AID ÆRF
JLA/tlh COO CORRB:;TION
CRSlTP TVD/W CORRæTIONS
CfvOffLP PffiFANGLECORREC1lON
DATE
REV BY
COMlAENTS
MDNlGHf SUN UNrr
Wa.L: E-104
ÆRMrr f\b: 201-2080
API f\b: 50-029-23049-00
SEC 6, T11 N. R14E4889' NSL & 501'WB..
BP EXploration (Alaska)
.
.
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marker.doc
f u( IV¡ffl~ ~ð 6 ~-(
DATA SUBMITTAL COMPLIANCE REPORT
2/26/2004
Permit to Drill 2012080
Well Name/No. PRUDHOE BAY UN MDS E-104
Operator BP EXPLORATION (ALASKA) INC
~ ,{ÒAJ\U~l
API No. 50-029-23049-00-00
-~~___~2~~~_--=--_-~~_--~_~~5_,__~_-__~~~Pletion Date 2/12/2002 r- Completi~n Status 1WINJ Current Status 1WINJ - ~ y --)~---
------ .--..- ---"------- ---- -._--- ---- ------------ - --------------- -- ----------------------------------------..--- ----------- ---- - --- --- .--- ----..------,----...,
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey
~/~
-------....------.-,-----
--'--
----.-
-------
DATA INFORMATION
Types Electric or Other Logs Run:
Well Log Information:
Logl Electr
Data Digital Dataset
Type Med/Frmt Number
:ro- --:C=--------11553
vU ~850
(data taken from Logs Portion of Master Well Data Maint)
(
Name
See Notes' ,
LIS Verification~,.'
Log Log Run Interval OHI
Scale Media No Start Stop CH Received Comments
----'-----"-'"
1 115 12684 Case 2/28/2003 Digital Well logging data
1 70 12647 Open 6/5/2002
1 70 12647 Open 6/5/2002
1 12300 12572 Case 3/15/2002
c""
,.. ,..
'" .., ' .
USVerifiëatlon '. . "
tíó 7 03 ReservolrSatûration
-.._--- -..---------------------
-- --------------
-----'-----------
------------.....-..----------.-.-..- --------,- ---'-"--'--"--"".----'
Well Cores/Samples Information:
Name
Interval
Start Stop
Sent
Received
Sample
Set
Number Comments
ADDITIONAL INFORMI}Q°N
Well Cored? Y ~
Daily History Received?
ØN
~N
(
.'
Chips Received?
-y I ~
Formation Tops
Analysis
Received?
--Y/N--
.. ---------,----------------..-----------..-
-------------------
Comments:
~=;:~:~='-.:;:~:=-~=-7f;:.. --' ==--=--=---'-----==----:;:= Tt-~~~~-===
(
.'
(
a D/-:;;6~
1/ 55 ~
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
February 27, 2003
RE:
MWD Fonnation Evaluation Logs: E-1O4 MIDNIGHT SUN,
AK-M:M:-11195
E-I04 .MIDNIGHT SUN:
Digital Log Images:
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Sign~~
Date:
RECEIVED
FEB 28 2003
Alaaka 0;': & Gas C{)fì$. û.1fiK¡~.Qì1
Anc:hOfJljt
..
(, STATE OF ALASKA (
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Revised: Began Injecting
1. Status of Well Classification of Service Well
DOH 0 Gas 0 Suspended 0 Abandoned IBI Service Water Injection
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 201-208
3. Address 8. API Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-23049-00
4. Location of well at surface 9. Unit or Lease Name
48891 NSL, 501' WEL, SEC. 06, T11N, R14E, UM Prudhoe Bay Unit
At top of productive interval
1361' NSL, 1121' WEL, SEC. 25, T12N, R13E, UM 10. Well Number
At total depth E-104i
14921 NSL, 1221' WEL, SEC. 25, T12N, R13E, UM
11. Field and Pool
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field / Midnight Sun
KBE = 64.38' ADL 028277
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 15. Water depth, if offshore 16. No. of Completions
11/28/2001 12/7/2001 2/11/2002 N/A MSL One
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+ TVO) 19. Directional Survey 20. Depth where SSSV set 21. Thickness of Permafrost
12684 8065 FT 12581 7997 FT IBI Yes DNo (Nipple) 2190' MD 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD, GR, Gyro, 4 Phase RES, PWD, NEU, DEN, US IT
23. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE Top BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.5# H-40 Surface 110' 30" 260 sx Arctic Set (ADDrox.)
9-5/8" 40# L-80 35' 5013' 12-1/4" 725 sx Articset Lite 3,322 sx 'G1
7" 26# L-80 32' 12664' 8-3/4" 134 sx Class 'GI
24. Perforations open to Production (MD+ TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
3-3/8" Gun Diameter, 6 spf 4-1/2", 12.6#, L-80 12370' 12313'
MD TVD MD TVD
12466' - 12486' 7922' - 79351 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
12500' - 12520' 7944' - 7957'
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect with 85 Bbls of Diesel
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
February 25, 2002 Water Injection
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAs-McF WATER-BBL CHOKE SIZE GAS-OIL RATIO
TEST PERIOD
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAs-McF WATER-BBL OIL GRAVITY-API (CORR)
Press. 24-HoUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
No core samples were taken. RECEIVED
r~1AR 2 6 2002
Alaska Oil & Gas ..... ' .
I
Form 10-407 Rev. 07-01-80 OR G NAL Anchorage to ~ Submit In Duplicate
.
..
(
29.
Geologic Markers
Measured True Vertical
Depth Depth
6744' 4671'
9263' 6036'
10104' 6479
12366' 7858'
12463' 7920'
12466' 7922'
12528' 7962'
Marker Name
Ugnu
West Sak
Colville Mudstone
HRl
Kalubik
Kuparuk
Miluveach
31. List of Attachments:
('
30.
Formation Tests
Include interval tested, pressure data, all fluids recovered
and gravity, GOR, and time of each phase.
Submitted with 10-407 dated 03-06-02: Summary of Daily Drilling Reports, Surveys
32. I hereby certify that the fore oing is true and correct to the best of my knowledge
Signed Terrie Hubble Title Technical Assistant
E-104i
Well Number
201-208
Permit No. / A roval No.
INSTRUCTIONS
Date D 3.. ~ -0 ól....
Prepared By Name/Number:
Terrie Hubble, 564-4628
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 28: If no cores taken, indicate 'none'.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
Form 10-407 Rev. 07-01-80
3/11/2002
ScblUlllbepger
NO. 1890
Alaska Data and Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
Company: Alaska Oil & Gas Cons Comm
Aftn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field:
Midnight Sun
-
Well
Job #
Log Description
Date
BL
Sepia
CD
--.-
E-104 ~o/---aOY 22084 RST-SIGMA 02/12/02 1 1 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E Benson Blvd.
Anchorage AK 99508-4254
RECE\VED
M .~p ,¡ ~ I)OQ?
;.1'" ,J,-",-
Schlumberger DCS
3940 Arctic Blvd Suite 300
Anchorage AK 99503-5789
ATTN: Sherrie
Date Delivered:
'\ & Gas ConS. Comß1iSSkm
- . e
Receive~ ~
..
( STATE OF ALASKA (
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well
0 Oil 0 Gas 0 Suspended 0 Abandoned IBI Service
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface- . ..' .. ., - ..
4889' NSL, 501' WEL, SEC. 06, T11N, R14E, UM . .".':';-:-:': :~
I ;.',;-è
At top of productive interval .
1361' NSL, 1121' WEL, SEC. 25, T12N, R13E, UM . jL~~~'~-'~~'
At total depth ;'~' ;';;'i_: \
1492' NSL, 1221' WEL, SEC. 25, T12N, R13E, UM ~,.:'-'-:-~ ::~ ¡
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No.
KBE = 64.38' ADL 028277
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband.
11/28/2001 12/7/2001 2/11/2002
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
12684 8065 FT 12581 7997 FT IBI Yes 0 No
22. Type Electric or Other Logs Run
MWD, GR, Gyro, 4 Phase RES, PWD, NEU, DEN, USIT
23. CASING LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE Top BOTTOM SIZE CEMENTING RECORD
20" 91.5# H-40 Surface 110' 30" 60 sx Arctic Set A rox.
9-5/8" 40# L-80 35' 5013' 12-1/4" 25 sx Articset Lite 3 322 sx 'G'
7" 26# L-80 32' 12664' 8-3/4" 134 sx Class 'G'
Classification of Service Well
Water Injection
7. Permit Number
201-208
8. API Number
50- 029-23049-00
9. Unit or Lease Name
Prudhoe Bay Unit
'S~ .
10. Well Number
E-104i
11. Field and Pool
Prudhoe Bay Field 1 Midnight Sun
15. Water depth, if offshore 16. No. of Completions
NI A MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
(Nipple) 2190' MD 1900' (Approx.)
AMOUNT PUllED
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
3-3/8" Gun Diameter, 6 spf
MD TVD
12466' - 12486' 7922' - 7935'
12500' - 12520' 7944' - 7957'
25.
SIZE
4-1/2", 12.6#, L-80
TUBING RECORD
DEPTH SET (MD)
12370'
PACKER SET (MD)
12313'
MD
TVD
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL MD AMOUNT & KIND OF MATERIAL USED
Freeze Protect with 85 Bbls of Diesel
27.
Date First Production
Not on Production
Date of Test Hours Tested
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
NIA
PRODUCTION FOR
TEST PERIOD
Flow Tubing Casing Pressure CALCULATED
Press. 24-HoUR RATE
OIL-Bel
GAs-McF
WATER-BBl
CHOKE SIZE
GAS-Oil RATIO
OIL-Bel
GAs-McF
WATER-BBl
Oil GRAVITY-API (CORR)
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core
No core samples were taken.
MAR 0 '7 20n~
Alaska Oil & Gas Cons. Commission
Ancr'lOrage
Form 10-407 Rev. 07-01-80
MA 4 Submit In Duplicate
i R I 2002
(
(
29.
Geologic Markers
30.
Formation Tests
Marker Name
Measured
Depth
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered
and gravity, GOR, and time of each phase.
Ugnu
6744'
4671'
West Sak
9263'
6036'
Colville Mudstone
10104'
6479
HRl
12366'
7858'
Kalubik
12463'
7920'
Kuparuk
12466'
7922'
Miluveach
12528'
79621
[~'¡r,~:':.;r'~~:;~\"v. ~'E.' ..~., 0,""" I
r'!I'""",',~:~~i '"
MAR 0 7 2002
i:~\laska Oi! & Gas Cons. Commission
II ",(,hiW"""o
/1"\\¡~.I.")~CI!~Jr¡;,
31. List of Attachments:
Summary of Daily Drilling Reports, Surveys
32. I ~erebY certify that the~ore Oín~ is true and correct to the best of my knowledge
Signed Terrie Hubble A A ; "" I.. 'tfJ.Prf.J Title Technical Assistant
'V\(JéJ {}' J IV ~
E-104i 201-208
Well Number Permit No. I Approval No.
Date 03.Dt.o .Ód
"
Prepared By Name/Number:
Terrie Hubble, 564.4628
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply tor injection, obseNation,
injection for ìn~situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'nonel.
Form 10-407 Rev. 07-01-80
Legal Name: E-104
Common Name: E-104
T~~[)áW
12/3/2001
J~titype
FIT
,',
....
" 'T~ujäpth (TMe) "
5,047.0 (ft)
, Leð:~:;~::::I:: ary
" .teSt Depth (TVP) "
3,777.0 (ft)
AMW
9.55 (ppg)
SuñacePteSsure
580 (psi)
leak Off Pressure (BHP)
2,454 (psi)
Page 1 of 1
EMW
12.51 (ppg)
~
'-c
Printed: 12/26/2001 9:12:14 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
11/27/2001
11/28/2001
11/29/2001
11/30/2001
12/112001
('
(
Page 1 of 5
BP EXPLORATION
Operations Summary Report
E-104
E-104
DRILL +COMPLETE
DOYON
DOYON 14
06:00 - 13:00
From - To Hours Activity Code NPT
P
PRE
13:00 - 16:30
16:30 - 18:00
18:00 -18:30
18:30 - 21:30
21 :30 - 23:00
23:00 - 23:30
23:30 - 00:00
00:00 - 01 :00
01 :00 - 02:30
02:30 - 04:00
04:00 - 00:00
00:00 - 13:00
13:00 - 13:30
13:30 - 16:30
16:30 -17:30
17:30 -18:00
18:00 -19:00
19:00 - 19:30
19:30 - 00:00
00:00 - 04:30
04:30 - 05:30
05:30 - 18:00
18:00 - 19:30
19:30 - 00:00
00:00 - 02:30
02:30 - 03:30
03:30 - 05:30
05:30 - 16:30
16:30 -17:00
17:00 -17:30
17:30 - 18:00
18:00 - 18:30
7.00 MOB
3.50 RIGU
1.50 RIGU
0.50 RIGU
3.00 RIGU
1.50 DRILL
0.50 DRILL
0.50 DRILL
1.00 DRILL
1.50 DRILL
1.50 DRILL
20.00 DRILL
13.00 DRILL
0.50 DRILL
3.00 DRILL
1.00 DRILL
0.50 DRILL
1.00 DRILL
0.50 DRILL
4.50 DRILL
4.50 DRILL
1.00 DRILL
12.50 DRILL
1.50 DRILL
4.50 DRILL
2.50 DRILL
1.00 DRILL
2.00 CASE
11.00 CASE
0.50 CASE
0.50 CEMT
0.50 CEMT
0.50 CEMT
Phase
P
P
PRE
PRE
P
P
P
P
P
PRE
PRE
SURF
SURF
SURF
P
SURF
P
P
SURF
SURF
P
P
P
P
SURF
SURF
SURF
SURF
P
P
P
P
P
SURF
SURF
SURF
SURF
SURF
P
P
P
P
P
SURF
SURF
SURF
SURF
SURF
P
SURF
P
P
P
SURF
SURF
SURF
P
P
SURF
SURF
P
P
SURF
SURF
Start: 11/27/2001
Rig Release: 12/14/2001
Rig Number:
Spud Date: 11/26/2001
End: 12/14/2001
Description of Operations
PJSM. Cantilever derrick into transport position. Move off of E
103. Move in rig & spot same on E 104. Shim rig, cantilever
derrick into position and connect lines. Spot cuttings tank.
ACCEPT rig at 1300 hrs Nov27, 2001.
NU Diverter bag and diverter line. Take on spud mud.
Load pipe shed wI 5" DP, 5" HWDP, Directional BHA. SLM
same.
Pre spud meeting wI rig crew and service personel
PU and rack in derrick, 5" DP, 5" HWDP and BHA.
MU 12 1/4" BHA.
Orient motor and install probe and pulser.
Function test diverter bag and knife valve. Fill stack and check
for leaks. Diverter function test witness waived by John
Spaulding of AOGCC.
Pre spud meeting. Pre job safety meeting. Review crew
positions I spud procedures.
Drill 12 1/4" hole from 110' to 182'.
Rig up slickline for photo gyro while adjusting cuttings
conveyor.
Drill from 182' to 1,455'. AST=6.6, ART=5.0.
Drill 12 1/4" hole from 1,455' to end of build section at 2,985'.
CBU.
Flow check. Well static. POH. Work through tight hole at
2,140'. Work and pump through tight spots at 2,105' and
2,005'. Pump out to 1,930'.
Stand back BHA.
Change MWD probes.
Change bit, adjust motor bend to 1.15 deg, orient motor.
RIH. Test MWD.
TIH to 1,909'. Wash and ream tight hole from 1,909' to 2,313'.
Ran 1 stand without pump or rotation. Became necessary to
resume pumping and rotation from 2,439' to 2,600'. RIH from
2,600' to 2,889'. Wash last stand to bottom. No fill.
Drill from 2,985' to 3,450'. Packed off while drilling at 3,450'.
Work pipe out of hole to estabilsh circulation. Clean hole.
Drill from 3,450' to TD at 5,027'. AST=2.5, ART=7.25.
Circulate low viscosity sweep. Circulate 1.75 x annular volume.
Flow check. Well static. POH to 2,412'. Work up through tight
spots and back down through. Wash through tight spots at
4,435', 3,156', 2,730', and 2,696' to 2,412'. No problem going
down or pulling past tight spots without pump after washing.
Continue POH. Work tight spots from 2,412' to 1,900'. No
hole problems from 1,900' to surface.
LD BHA.
PJSM. RU to run 95/8" casing.
MU float equipment. Bakerlok first three connections. Check
floats. Run 9 5/8", 40#, L-80, BTC casing. Wash through tight
spots at base of permafrost and Eocene unconformity.
MU landing joint and land casing.
Establish circulation. Stage up circulating rate to 10 bpm, 625
psi. Reciprocate casing. PU=250,OOO, SO=125,OOO.
LD Franks fill up tool and install cement head.
Pump 5 bbls CW-100. Pressure test cement lines to 4,000 psi.
..,.
Printed: 12/26/2001 9:12:27 AM
(
('
BP EXPLORATION Page 2 of 5
Operations Summary Report
Legal Well Name: E-1 04
Common Well Name: E-104 Spud Date: 11/26/2001
Event Name: DRILL +COMPLETE Start: 11/27/2001 End: 12/14/2001
Contractor Name: DOYON Rig Release: 12/14/2001
Rig Name: DOYON 14 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
12/112001 18:30 - 21 :00 2.50 CEMT P SURF Pump 5 bbls CW-100, 75 bbls 10.2 ppg Mud Push spacer, 573
bbls 10.7 ppg Arctic Set Lite lead cement, and 67 bbls 15.8
ppg class G tail cement. Reciprocate casing until 30 bbls of
lead cement around casing.
21 :00 - 22:30 1.50 CEMT P SURF Displace cement with rig pumps at 5 to 7 bpm, 700 to 1300 psi.
Bump plug on calculate strokes. Cement in place 22: 15 hrs.
Check floats.
22:30 - 23:30 1.00 CEMT P SURF LD cement head. Back out and LD landing joint. Remove
elevators and bails from top drive.
23:30 - 00:00 0.50 CEMT P SURF Flush stack with stack washer.
12/2/2001 00:00 - 01 :00 1.00 CEMT P SURF Clean up casing tools and LD. Clear rig floor.
01 :00 - 03:00 2.00 CEMT P SURF ND diverter.
03:00 - 03:30 0.50 CEMT P SURF Install FMC split speed head. Test same.
03:30 - 05:30 2.00 CEMT P SURF NU BOPE.
05:30 - 12:00 6.50 CEMT P SURF Test BOPE to 250 psi 14,000 psi as per BP policy and AOGCC
regulations. Witness of BOP test waived by John Spaulding of
AOGCC.
12:00 - 12:30 0.50 CEMT P SURF Pull test plug. LD test joint. Blow down kill and choke lines.
12:30 - 13:00 0.50 CEMT P SURF Install wear ring. Close blind rams and test casing to 3,000 psi
for 5 minutes to check integrity of the TAM port collar. Good
test.
13:00 - 14:30 1.50 DRILL P PROD1 MU BHA.
14:30 - 15:30 1.00 DRILL P PROD1 Upload to MWD. Install RA sources.
15:30 - 16:30 1.00 DRILL P PROD1 MU BHA. Surface test MWD. No MWD signal.
16:30 - 17:30 1.00 DRILL P PROD1 Slip and cut drilling line.
17:30 - 18:30 1.00 DRILL N DFAL PROD1 Stand back BHA.
18:30 -19:30 1.00 DRILL N DFAL PROD1 Trouble shoot MWD. Debris (rocks and rust) under pulser.
Change out pulser.
19:30 - 20:00 0.50 DRILL N DFAL PROD1 Flush mud line from pump with new mud. Test MWD.
20:00 - 20:30 0.50 DRILL N DFAL PROD1 MU BHA.
20:30 - 00:00 3.50 DRILL P PROD1 TIH picking up DP from pipe shed.
12/3/2001 00:00 - 00:30 0.50 DRILL P PROD1 RIH picking up 5" DP. Tag cement above float collar at 4,917'.
00:30 - 02:30 2.00 DRILL P PROD1 Attempt to pressure test 9 5/8" casing. Pressured up to 480
psi and pumped away. Checked surface equipment. No leaks
found at surface. Retest with same results. Suspect Tam port
collar is open.
02:30 - 03:30 1.00 DRILL P PROD1 Displace well bore to new drilling mud. Attempt to test casing,
failed test.
03:30 - 06:00 2.50 DRILL N DFAL PROD1 POH.
06:00 - 07:30 1.50 DRILL N DFAL PROD1 Down load MWD. Remove RA sources and stand back MWD.
07:30 - 08:30 1.00 DRILL N DFAL PROD1 MU TAM shifting tool and RIH to 985'. Close TAM port collar
and test to 1,500 psi.
08:30 - 09:30 1.00 DRILL N DFAL PROD1 POH and LD Tam shifting tool. Test casing to 3,000 psi.
09:30 - 11 :30 2.00 DRILL N DFAL PROD1 MU BHA. Load MWD. Load sources. Pulse test MWD.
11 :30 - 12:30 1.00 DRILL P PROD1 PU drill pipe from shed. Rotate through Tam port collar at 10
rpm.
12:30 -13:30 1.00 DRILL N DFAL PROD1 Test 9 5/8" casing to 3,500 psi for 30 minutes.
13:30 - 17:30 4.00 DRILL P PROD1 Continue PU DP from shed.
17:30 -19:00 1.50 DRILL P PROD1 Drill float collar at 4,926', float shoe at 5,011', and 20' of new
formation to 5,047'.
19:00 -19:30 0.50 DRILL P PROD1 Perform FIT test to 12.5 ppg EMW.
19:30 - 00:00 4.50 DRILL P PROD1 Obtain baseline ECD and SPR. 10.9 ppg wlo rotation and 11.1
ppg wI rotation. Drill from 5,047' to 5,896'.
Printed: 12/26/2001 9: 12:27 AM
(
(
BP EXPLORATION Page 3 of 5
Operations Summary Report
Legal Well Name: E-1 04
Common Well Name: E-104 Spud Date: 11/26/2001
Event Name: DRILL +COMPLETE Start: 11/27/2001 End: 12/14/2001
Contractor Name: DOYON Rig Release: 12/14/2001
Rig Name: DOYON 14 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
12/412001 00:00 - 06:00 6.00 DRILL P PROD1 Drill from 5,896' to 7,045'. AST=O, ART=3.6
06:00 - 07:00 1.00 DRILL P PROD1 CBU. Flow check. Well static.
07:00 - 13:30 6.50 DRILL P PROD1 POH. Pump and back ream from 7,000' to 5,600'. POH to
casing shoe at 5,013'.
13:30 - 14:30 1.00 DRILL P PROD1 Slip and cut drilling line.
14:30 - 15:30 1.00 DRILL P PROD1 TIH to 6,700'.
15:30 -16:30 1.00 DRILL P PROD1 Ream from 6,700' to 7,045'. Coal stringer in the Ugnu from
6,700' to 6,758'.
16:30 - 00:00 7.50 DRILL P PROD1 Drill from 7,045' to 8,037'. AST=O, ART=4.62
12/5/2001 00:00 - 07:00 7.00 DRILL P PROD1 Drill from 8,037' to 8,659'. AST=O, ART=4.2.
07:00 - 10:00 3.00 DRILL N RREP PROD1 Repair top drive.
10:00 -15:00 5.00 DRILL P PROD1 Flow check. Well static. Pump dry job. POH. Pump and back
ream from 7,626' to 6,566' at 50 spm, 60 rpm. POH to 6,375'.
15:00 -16:00 1.00 DRILL P PROD1 TIH from 6,375' to 8,659'. No hole problems.
16:00 - 00:00 8.00 DRILL P PROD1 Drill from 8,659' to 9,633'. AST=0.58, ART=4.38.
12/6/2001 00:00 - 04:00 4.00 DRILL P PROD1 Drill 8 3/4" hole from 9,633' to 10,112'. AST=O, ART=3.01.
04:00 - 05:00 1.00 DRILL P PROD1 CBU. Flow check. Well static.
05:00 - 10:30 5.50 DRILL P PROD1 POH. Tight hole and swabbing. Pump and back ream out
from 9,840' to 8,389' 120 spm, 2800 psi, 80 rpm. Pulled from
8,389' to 8,199' no problems with out pump.
10:30 - 11 :00 0.50 DRILL P PROD1 RIH from 8,199' to 10,112'. Ream last 10' to bottom.
11:00-00:00 13.00 DRILL P PROD1 Drilled from 10,112'to 11,261'. AST=1.48,ART=6.19.
12/7/2001 00:00 - 02:00 2.00 DRILL P PROD1 Drill from 11,261' to 11,453'. AST=O, ART=1.18.
02:00 - 03:00 1.00 DRILL P PROD1 Pump sweep. Circulate bottoms up. Flow check. Well static.
03:00 - 05:30 2.50 DRILL P PROD1 Pull 2 stands. Hole tight and swabbing. Pump out of hole to
9,912' at 100 spm, 2,100 psi. RIH no problems.
05:30 - 20:30 15.00 DRILL P PROD1 Drill from 11,453' to TD at 12,684'. Circulate and change out
swab and liner on pump at +1- 12,300'. AST=1.07, ART=7.39.
20:30 - 22:00 1.50 DRILL P PROD1 Pump sweep. Circulate sweep surface to surface.
22:00 - 00:00 2.00 DRILL P PROD1 Flow check. Well static. POH for short trip to casing shoe.
Pull to 10,584'.
12/8/2001 00:00 - 04:00 4.00 DRILL P PROD1 POH from 10,584' to 8,866'. 20K over pull and swabbing from
9,716' to 9,750' and from 9,560' to 9,516'. Pump dry job.
Continue to POH to 4,940', inside the casing shoe.
04:00 - 05:30 1.50 DRILL P PROD1 Slip and cut drilling line. Service top drive.
05:30 - 09:00 3.50 DRILL P PROD1 RIH. Wash and ream last stand to bottom. No fill.
09:00 - 12:30 3.50 DRILL P PROD1 Losing mud while circulating. Stopped pump. Well gave back
some mud. Brought pump back up slowly and staged up
circulation rate with no further losses. Lots of cuttings and
viscous mud on bottoms up. Pumped sweep at 14 bpm, 3,450
psi. Sweep brought back additional cuttings. Spotted 60 bbl
liner running pill.
12:30 -18:30 6.00 DRILL P PROD1 Flow check. Well static. POH to 11,259'. Pump dry job.
Continue to POH to 3,122'.
18:30 - 20:00 1.50 DRILL P PROD1 LD 57 joints of 5" DP.
20:00 - 20:30 0.50 DRILL P PROD1 LD HWDP.
20:30 - 21 :00 0.50 DRILL P PROD1 LD BHA.
21 :00 - 22:00 1.00 DRILL P PROD1 Unload RA sources. Down load MWD tools.
22:00 - 23:00 1.00 DRILL P PROD1 Continue to LD BHA. Flush motor. Break bit.
23:00 - 23:30 0.50 DRILL P PROD1 Pull wear ring.
23:30 - 00:00 0.50 CASE P COMP Make dummy run with landing joint.
12/9/2001 00:00 - 00:30 0.50 CASE P COMP Make dummy run with landing joint and casing hanger. Align
stack.
Printed: 12/26/2001 9:12:27 AM
('
('
BP EXPLORATION Page 4 of 5
Operations Summary Report
Legal Well Name: E-104
Common Well Name: E-104 Spud Date: 11/26/2001
Event Name: DRILL +COMPLETE Start: 11/27/2001 End: 12/14/2001
Contractor Name: DOYON Rig Release: 12/14/2001
Rig Name: DOYON 14 Rig Number:
Date From - To Hours Activity Code NPT Phase Description of Operations
12/912001 00:30 - 02:00 1.50 CASE P COMP RU to run 7" casing.
02:00 - 08:00 6.00 CASE P COMP Run 7", 26#, L-80, BTC-M casing to 4,675'. Started losing
returns at +1-3,700'.
08:00 - 09:30 1.50 CASE P COMP Circulate and condition mud at 7 bpm, 670 psi.
09:30 - 17:00 7.50 CASE P COMP Continue to run casing to 8,201'. Circulate every 10th joint
down to 6,145'. Got minimal returns from casing displacement
starting at 6,500'.
17:00 - 18:00 1.00 CASE P COMP Circulate 8 spm at 750 psi and reciprocate casing. Getting
back 1/2 or less of volume pumped.
18:00 - 00:00 6.00 CASE P COMP Continue to run casing to 12,100'. Circulate every 15 joints and
attempt to gain circulation and put good mud in annulus. No
returns from casing displacement or circulation.
12/10/2001 00:00 - 01 :30 1.50 CASE P COMP Continue running 7" casing from 12,100' to 12,664'. Increased
drag going through the HRZ. Land casing. PU=340K.
01 :30 - 02:30 1.00 CASE P COMP Reciprocate casing and attempt to gain circulation. Pumping at
4 bpm, 1,100 psi. Getting small amount of returns on the
upstroke, and very minimal returns on the down stroke.
02:30 - 04:00 1.50 CASE P COMP MU cement head. Attempt to reciprocate casing. Unable to
move casing. Circulate and attempt to gain circulation. No
returns.
04:00 - 06:00 2.00 CASE P COMP PJSM. Pump 5 bbls CW-100. Pressure test cement lines to
3,500 psi. Pump additional 15 bbls CW-100, 20 bbls mud push
spacer weighted to 11.5 ppg, 28 bbls 15.8 ppg class G cement,
displace with seawater through Dowell pumps. Pump
calculated displacement to bump plug. Did not bump plug.
Continue to pump 1/2 the shoe track volume. Shut down. Did
not bump plug.
06:00 - 07:30 1.50 CASE P COMP LD cement head, landing joint, and casing tools.
07:30 - 09:00 1.50 CASE P COMP PU test joint and running tool. Install packoff. RILDS. Test to
5,000 psi for 10 minutes.
09:00 - 22:00 13.00 CASE P COMP LD 5" DP in the mouse hole. Freeze protect the 7" x 9 5/8"
annulus with 70 bbls of dead crude while LD DP.
22:00 - 22:30 0.50 CASE P COMP Install wear bushing.
22:30 - 00:00 1.50 CASE P COMP RU eline to run gage ring I JB and USIT log.
12/11/2001 00:00 - 05:00 5.00 CLEAN P COMP Run 6.05" OD guage ring with junk basket, tag up at
12,435' WLM
05:00 - 08:30 3.50 CLEAN P COMP Run 4.81" OD guage ring with junk basket, tag up at
12,450' WLM
08:30 - 15:30 7.00 CLEAN P COMP Run US IT, tag up at 12,450' WLM,
15:30 - 16:30 1.00 CLEAN P COMP PJSM, rig down wireline, Schlumberger
16:30 - 18:00 1.50 CLEAN P COMP PJSM, Slip and cut drilling line
18:00 - 20:00 2.00 CLEAN N CEMT COMP PJSM, Change out saver sub from 41/2" IF to 4" HT 38
20:00 - 20:30 0.50 CLEAN N CEMT COMP PJSM, MU BHA, 6" bit wI no jets, bit sub w/ no float, 2
x 4 3/4" DCs, jars, XIO
20:30 - 00:00 3.50 CLEAN N CEMT COMP PJSM, PU, MU 4" HT 38, DP from pipe shed, RIH
12/12/2001 00:00 - 00:30 0.50 CLEAN N CEMT COMP Rig service
00:30 - 07:00 6.50 CLEAN N CEMT COMP PJSM, PU, MU, rabbit 4" HT 38 DP from pipe shed, run
in
07:00 - 07:30 0.50 CLEAN N CEMT COMP Wash from 12,432' to 12,458' top of cement plug
07:30 - 10:30 3.00 CLEAN N CEMT COMP Rotary drill cement plug and cement from 12,458' to
12,581' top of float collar
10:30 - 11 :30 1.00 CLEAN N CEMT COMP Circulate hi-vis sweep, 2200 psi at 11 bpm. Rotate and
reciprocate pipe at 90 RPM.
Printed: 12/26/2001 9:12:27 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
12/12/2001
12/13/2001
12/14/2001
(
"
('
Page 5 of 5
BP EXPLORATION
Operations Summary Report
E-104
E-104
DRILL +COMPLETE
DOYON
DOYON 14
11 :30 - 12:30
From - To Hours Activity Code NPT
COMP
12:30 - 14:30
14:30 - 23:00
23:00 - 23:30
23:30 - 00:00
00:00 - 00:30
00:30 - 11 :30
11 :30 - 13:00
13:00 - 14:00
14:00 - 16:00
16:00 - 17:30
17:30 -19:30
19:30 - 21:00
21 :00- 21 :30
21 :30 - 22:30
22:30 - 23:30
23:30 - 00:00
00:00 - 01 :00
01 :00 - 02:00
02:00 - 03:00
Phase
1.00 CLEAN P
2.00 CLEAN N
8.50 CLEAN N
0.50 CLEAN N
0.50 CLEAN N
0.50 RUNCO~rP
11.00 RUNCO~rP
1.50 RUNCO~rP
1.00 RUNCO~rP
2.00 RUNCO~rP
CEMT COMP
CEMT COMP
CEMT COMP
CEMT COMP
COMP
COMP
COMP
COMP
COMP
1.50 RUNCO~ P
2.00 RUNCO~P
1.50 RUNCO~P
0.50 RUNCO~P
COMP
COMP
COMP
COMP
1.00 RUNCO~P
COMP
1.00 RUNCO~P
0.50 RUNCO~P
1.00 RUNCO~P
COMP
COMP
COMP
1.00 RUNCO~P
1.00 WHSUR P
COMP
COMP
Start: 11/27/2001
Rig Release: 12/14/2001
Rig Number:
Spud Date: 11/26/2001
End: 12/14/2001
Description of Operations
PJSM, Pressure test casing to 4000 psi for 30 minutes,
OK
Reverse circulate hi-vis sweep, 3000 psi at 98 spm
PJSM, POOH laying down DP to pipe shed
Lay down BHA
Pull wear bushing
Rig up to run 4 1/2" completion assembly
Run 4 1/2" completion string as per program
Reverse circulate inhibited brine 220 psi at 3 bpm
MU landing joint, land tubing hanger and RILD
PJSM, Pressure test tubing, set Baker packer, pressure
test to 4000 psi for 30 minutes, OK, bleed down tubing
pressure to 2000 psi, pressure up annulus to 4000 psi
for 30 minutes, OK, bleed down pressure to shear RP
valve
Change top rams from 4 1/2" x 7" to 3 1/2" x 5"
variables
Nipple down BOPE
Nipple up adapter flange and tree
Pressure test wellhead, adapter flange to 250 psi, 5000
psi for 10 minutes each, OK
Replace shear pin on wing valve stem, sheared when
over torqued trying to shut valve, pressure test tree to
5000 psi for 10 minutes, OK
PJSM, Pull TWC with Drill Site Maintenance
PJSM, rig up HB & R to freeze protect, pressure test
lines to 2500 psi, OK
Pump 85 bbls to freeze protect wellbore, down annulus,
HB & R unit, pump at 2050 psi, 2.6 bpm
U tube freeze protect
Set BPV, test down annulus at 1000 psi for 10 minutes,
OK, rig down HB & R unit, remove rigs double valves
and secure wellhead
Printed: 12/26/2001 9:12:27 AM
(
(
Well:
Field:
API:
Permit:
E-104
Prudhoe Bay Unit
50-029-23049-00
201-208
Rig Accept:
Rig Spud:
Rig Release:
DrillingJ:!!.g:
11/27/01
11/28/01
12/14/01
Doyon 14
POST - RIG WORK
------.-.--...---- ...-..-.--- ., .-.... ---'----'--"--'------"---...---.- --.--' -"'-- --...-- ---- ----------___n----__--.----.------.-.---...----. --.----..-----,-..---.., "..--..--.------. --"-'--"'---""-- -,... -"""- -- -.. -'--" ---..-
01130/02
PULLED RHC PLUG AND BALL & ROD FROM XN NIPPLE @ 12359' MD, DRIFTED TUBING AND TAGGED
PBTD AT 12,560' SLM WITH A 3 3/8" DUMMY GUN.
02/11/02
LOG JEWELRY AND PERFORATE 12500'-12520' & 12466'-12486' WITH 3-3/8" PJ HSD GUNS - 6SPF / 60 DEG
RANDOM.
02/12/02
PERFORM SBHPS LOG AT 7960',7915', AND 7786' SSTVDs - 3380 PSI, 3363 PSI, 3304 PSI RESPECTIVELY.
LITTLE RED PUMPERS ON LOCATION INJECTING FOR WFL, PSP IPROF, AND RST SIGMA LOGGING.
FIELD INTERPRETATION OF WFL - NO DEFINITIVE INDICATION UF UPFLOW. DATA WILL BE DEFFERED
TO TOWN FOR FURTHER ANALYSIS. FIELD SPLITS FROM 3-1/2" FBS - 78% INTO BOTTOM PERFS AND
22% INTO TOP SET OF PERFS. NO FIELD PICK OF GOC FROM RST SIGMA. WELL LEFT "SHUT IN".
02/14/02
SBHPS ( PET RED AT ). JOB IN PROGRESS.
02/15/02
STATIC WAS COMPLETED ON 2/14, PULL RP - SET DGLV BK LATCH @ STA #1 PULL SS CS.
~'
,
I(
C", ':r1"".,:",~511":¡'::i""":"::'
"~~W~~,i.'.':iJ.\' ~.,~l. f..:...~~~. "".:"~'~"..,:,,,,"',::I.:.:I. II:, :.'::~JCJ;....,
C7':~~¡'i""';I'!\ :ri~....... C,..
18-Dec-0 1
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well E-104
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 384.05' MD
Window / Kickoff Survey , MD
Projected Survey: 12,684.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
RECEIVED
Attachment(s)
DEC 2 8 2001
Àíaska Oil & Gas Cons, Corm'lU$$IQr
Anc~orage
D EFI N IrlVE
-"'-.-
North Slope Alaska
Alaska Drilling & Wells
PBU_WOA E Pad, Slot E-104
E-104
,r-=--,-
Job No. AKZZ11195, Surveyed: 7 December, 2001
SURVEY REPORT
17 December, 2001
Your Ref: AP/500292304900
Surface Coordinates: 5976672.84 N, 664449.52 E (70020' 33.2582" N, 148039' 55.0257" W)
Surface Coordinates relative to Project H Reference: 976672.84 N, 164449.52 E (Grid)
Surface Coordinates relative to Structure Reference: 3468.06 N, 1987.11 E (True)
Kelly Bushing: 64.38ft above Mean Sea Level
.---
spa"""""y-sUfl
DRILLING seRVIc:es
A Halliburton Company
Survey Ref: 5vy11048
Sperry-Sun Drilling Services .
Survey Report for E-104 D EFI N IrlVE
Your Ref: API 500292304900
Job No. AKZZ11195, Surveyed: 7 December, 2001
Alaska Drilling & Wells
North Slope Alaska PBU- WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azlm. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
E-1 04 Gyro
I
0.00 0.000 0.000 -64.38 0.00 O.OON 0.00 E 5976672.84 N 664449.52 E 0.00 Tolerable Gyro , ---
'-- 175.00 0.200 215.000 110.62 175.00 0.25S 0.18W 5976672.59 N 664449.35 E 0.114 -0.09
264.00 0.250 210.000 199.62 264.00 0.55S 0.36W 5976672.29 N 664449.17 E 0.060 -0.20 AK-6 BP.WR-AK
E-104
384.05 1.890 258.660 319.64 384.02 1.16 S 2.43W 5976671.63 N 664447.11 E 1 .445 0.61
472.63 3.360 270.120 408.13 472.51 1.44 S 6.46W 5976671.26 N 664443.09 E 1.754 2.89
534.00 4.650 258.000 469.35 533.73 1.96 S 10.69 W 5976670.65 N 664438.87 E 2.503 5.13
623.00 6.500 256.000 557.93 622.31 3.93S 19.11 W 5976668.50 N 664430.50 E 2.090 8.83
713.00 9.000 267.000 647.10 711.48 5.53S 31.09 W 5976666.63 N 664418.56 E 3.218 15.04
775.19 11.560 282.740 708.30 772.68 4.41S 42.03 W 5976667.51 N 664407.60 E 6.075 22.73
839.00 13.730 286.110 770.56 834.94 O.90S 55.54 W 5976670.73 N 664394.01 E 3.590 33.89
934.24 16.800 287.290 862.43 926.81 6.33N 79.55 W 5976677.43 N 664369.86 E 3.240 54.49
1029.86 17.460 288.760 953.81 1018.19 15.05 N 106.32 W 5976685.56 N 664342.89 E 0.825 77.99
1125.04 19.620 294.060 1044.05 1108.43 26.16 N 134.44 W 5976696.05 N 664314.54 E 2.876 104.20
1220.99 20.560 295.450 1134.16 1198.54 39.97 N 164.36 W 5976709.20 N 664284.32 E 1.099 133.64
1316.65 24.360 296.340 1222.55 1286.93 55.95 N 197.22 W 5976724.45 N 664251.12 E 3.988 166.60
1413.02 27.640 296.770 1309.15 1373.53 74.84 N 235.00 W 5976742.51 N 664212.93 E 3.409 204.91 --,
1509.22 29.140 297.030 1393.78 1458.16 95.54 N 275.79 W 5976762.30 N 664171.70 E 1.565 246.51
1604.63 28.400 295.640 1477.41 1541.79 115.91 N 316.94 W 5976781 .77 N 664130.11 E 1.046 288.07
1700.65 29.980 298.700 1561.24 1625.62 137.32 N 358.57 W 5976802.26 N 664088.02 E 2.263 330.75
1797.21 31.710 297.960 1644.14 1708.52 160.80 N 402.15 W 5976824.78 N 664043.94 E 1.834 376.27
1892.70 31.660 298. 750 1725.40 1789.78 184.62 N 446.29 W 5976847.63 N 663999.29 E 0.438 422.39
1987.77 30.760 298.180 1806.71 1871.09 208.10 N 489.60 W . 5976870.15 N 663955.48 E 0.996 467.73
2083.82 32.510 298.820 1888.48 1952.86 232.15 N 533.86 W 5976893.22 N 663910.69 E 1.855 514.11
2178.52 35.580 299.140 1966.94 2031.32 257.84 N 580.24 W 5976917.89 N 663863.77 E 3.247 563.09
2273.72 36.350 298.660 2043.99 2108.37 284.85 N 629.18 W 5976943.82 N 663814.24 E 0.861 614.72
2369.45 39.590 303.450 2119.47 2183.85 315.29 N 679.55 W 5976973.15 N 663763.21 E 4.573 669.90
2464.95 42.400 306.580 2191.55 2255.93 351.26 N 730.82 W 5977007.99 N 663711.18 E 3.643 729.97
2560.44 44.410 309.730 2260.93 2325.31 391.81 N 782.38 W 5977047.40 N 663658.74 E 3.093 793.81
-.-.
-. - .-. ..
14 December, 2001 - 15:18
Page 2 of 7
DrlllQuest 2.00.09.003
Sperry-Sun Drilling Services .
Survey Report for E-104
Your Ref: API 500292304900
Job No. AKZZ11195, Surveyed: 7 December, 2001
Alaska Drilling & Wells
North Slope Alaska PBU_WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azfm. Depth Depth Northfngs Eastfngs Northfngs Eastfngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
2657.43 47.660 312.900 2328.26 2392.64 437.92 N 834.75 W 5977092.35 N 663605.36 E 4.093 862.50
2753.74 50.520 319.480 2391 .36 2455.74 490.45 N 885.02 W 5977143.76 N 663553.96 E 5.954 934.90
2850.18 52.040 321.850 2451.69 2516.07 548.65 N 932.69 W 5977200.90 N 663505.02 E 2.482 1010.13
2945.04 52.770 320.720 2509.56 2573.94 607.29 N 979.70W 5977258.50 N 663456.73 E 1.218 1085.29 ~'
3032.98 52.870 318.810 2562.71 2627.09 660.78 N 1024.96 W 5977310.97 N 663410.32 E 1.734 1155.32
3129.49 52.660 323.920 2621.13 2685.51 720.76 N 1072.91 W 5977369.89 N 663361.06 E 4.221 1232.11
3226.06 52.650 326.030 2679.72 2744.10 783.62 N 1116.97 W 5977431.77 N 663315.63 E 1.737 1308.73
3320.99 51.850 326.740 2737.84 2802.22 846.13 N 1158.52 W 5977493.35 N 663272.72 E 1.030 1383.52
3417.29 52.890 326.790 2796.63 2861.01 909.92 N 1200.32 W 5977556.21 N 663229.53 E 1.081 1459.46
3513.11 52.560 328.010 2854.67 2919.05 974.15N 1241.40 W 5977619.53 N 663187.05 E 1.070 1535.30
3607.51 53.480 327.420 2911 .45 2975.83 1037.90 N 1281.68 W 5977682.38 N 663145.38 E 1.095 1610.26
3703.49 55.600 326.390 2967.13 3031.51 1103.39 N 1324.37 W 5977746.91 N 663101.26 E 2.375 1688.08
3799.24 57.930 324.340 3019.61 3083.99 1169.26 N 1369.90 W 5977811.77 N 663054.30 E 3.021 1767.97
3894.31 57.460 323.750 3070.42 3134.80 1234.31 N 1417.08 W 5977875.76 N 663005.71 E 0.721 1848.25
3991.45 56.610 324.140 3123.27 3187.65 1300.19 N 1465.05 W 5977940.58 N 662956.31 E 0.938 1929.67
4086.87 56.320 326.340 3175.99 3240.37 1365.53 N 1510.39 W 5978004.91 N 662909.54 E 1.946 2009.03
4182.56 55.450 324.560 3229.66 3294.04 1430.78 N 1555.31 W 5978069.16 N 662863.20 E 1.788 2088.06
4279.02 55.170 325.720 3284.56 3348.94 1495.86 N 1600.64 W 5978133.22 N 662816.45 E 1.031 2167.21
4374.75 55.210 325.780 3339.21 3403.59 1560.83 N 1644.88 W 5978197.21 N 662770.80 E 0.066 2245.59
4470.78 54.370 326.780 3394.58 3458.96 1626.08 N 1688.44 W 5978261.49 N 662725.82 E 1.220 2323.77
_c~
4566.80 53.540 327.500 3451.08 3515.46 1691.30 N 1730.57 W 5978325.77 N 662682.27 E 1.056 2401.03
4662.57 55.220 326.050 3506.86 3571.24 1756.41 N 1773.23 W 5978389.93 N 662638.19 E 2.143 2478.54
4758.35 54.690 326.080 3561.85 3626.23 1821.47N 1817.00 W 5978454.01 N 662593.00 E 0.554 2556.71
4853.45 54.330 326.440 3617.07 3681.45 1885.86 N 1860.01 W 5978517.44 N 662548.59 E 0.488 2633.87
4948.43 57.230 325.530 3670.47 3734.85 1950.94 N 1903.95 W 5978581.55 N 662503.23 E 3.154 2712.15
4979.90 57.580 324.960 3687.43 3751.81 1972.72 N 1919.06 W 5978602.99 N 662487.64 E 1.888 2738.61
5063.19 58.120 324.690 3731.75 3796.13 2030.37 N 1959.69 W 5978659.73 N 662445.77 E 0.704 2809.01
5158.79 58.650 325.780 3781.86 3846.24 2097.24 N 2006.11 W 5978725.57 N 662397.89 E 1.118 2890.24
5253.99 59.260 324.580 3830.96 3895.34 2164.20 N 2052.68 W 5978791.49 N 662349.86 E 1.256 2971.63
5349.47 59.900 324.510 3879.31 3943.69 2231.27 N 2100.44 W 5978857.50 N 662300.64 E 0.673 3053.85
~-~ --- -
- - ----
14 December, 2001 - 15:18
Page 3 of 7
DrlllQuest 2.00.09.003
Sperry-Sun Drill i ng Services .
Survey Report for E-1 04
Your Ref: API 500292304900
Job No. AKZZ11195, Surveyed: 7 December, 2001
Alaska Drilling & Wells
North Slope Alaska PBU- WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azlm. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
5446.67 60.200 324.950 3927.83 3992.21 2300.03 N 2149.07 W 5978925.17 N 662250.51 E 0.499 3137.94
5542.18 60.460 324.370 3975.11 4039.49 2367.72 N 2197.07 W 5978991.80 N 662201.04 E 0.594 3220.80
5637.47 60.760 324.540 4021.87 4086.25 2435.28 N 2245.34 W 5979058.28 N 662151.30 E 0.351 3303.71
5733.87 58.520 324.550 4070.59 4134.97 2503.03 N 2293.59 W 5979124.96 N 662101.58 E 2.324 3386.77 /-"_.>-,
5829.08 58.050 324.770 4120.65 4185.03 2569.10 N 2340.43 W 5979189.98 N 662053.29 E 0.531 3467.63
5924.53 57.860 323.670 4171.29 4235.67 2634.74 N 2387.74 W 5979254.56 N 662004.56 E 0.997 3548.45
6020.55 58.550 323.360 4221.88 4286.26 2700.35 N 2436.26 W 5979319.10 N 661954.61 E 0.769 3630.00
6116.60 58.760 324.210 4271.85 4336.23 2766.53 N 2484.73 W 5979384.20 N 661904.70 E 0.787 3711.97
6212.07 58.380 324.120 4321.63 4386.01 2832.58 N 2532.42 W 5979449.18 N 661855.57 E 0.406 3793.34
6307.84 57.940 323.510 4372.15 4436.53 2898.24 N 2580.45 W 5979513.78 N 661806.11 E 0.710 3874.63
6403.05 57.660 323.280 4422.89 4487.27 2962.92 N 2628.49 W 5979577.38 N 661756.66 E 0.358 3955.15
6498.71 57.780 323.580 4473.98 4538.36 3027.87 N 2676.68 W 5979641.27 N 661707.06 E 0.293 4035.98
6594.38 57.370 323.430 4525.28 4589.66 3092.79 N 2724.71 W 5979705.12 N 661657.62 E 0.449 4116.69
6689.95 57.180 323.830 4576.94 4641.32 3157.53 N 2772.39 W 5979768.79 N 661608.54 E 0.404 4197.03
6786.53 56.940 323.950 4629.46 4693.84 3223.01 N 2820.15 W 5979833.21 N 661559.34 E 0.269 4278.01
6882.22 56.930 323.850 4681.67 4746.05 3287.81 N 2867.40 W 5979896.95 N 661510.68 E 0.088 4358.13
6977.01 57.040 323.500 4733.31 4797.69 3351.84N 2914.49 W 5979959.94 N 661462.21 E 0.331 4437.56
7074.53 56.910 324.320 4786.46 4850.84 3417.92 N 2962.65 W 5980024.94 N 661412.61 E 0.717 4519.25
7170.23 56.880 323.720 4838.73 4903.11 3482.79 N 3009.75 W 5980088.77 N 661364.10 E 0.526 4599.33
7265.52 56.870 324.050 4890.80 4955.18 3547.25 N 3056.78 W 5980152.19 N 661315.66 E 0.290 4679.07
.----
7360.88 56.790 325.000 4942.98 5007.36 3612.26 N 3103.11 W 5980216.16 N 661267.92 E 0.838 4758.77
7456.82 56.550 325.060 4995.69 5060.07 3677.94 N 3149.05 W 5980280.82 N 661220.55 E 0.256 4838.78
7551.91 56.450 325.760 5048.18 5112.56 3743.22 N 3194.07 W 5980345.09 N 661174.11 E 0.623 4917.89
7648.15 56.470 325.390 5101.35 5165.73 3809.39 N 3239.41 W 5980410.25 N 661127.32 E 0.321 4997.90
7744.11 56.450 325.380 5154.37 5218.75 3875.21 N 3284.85 W 5980475.06 N 661080.45 E 0.023 5077.69
7839.30 56.070 325.690 5207.24 5271.62 3940.47 N 3329.64 W 5980539.33 N 661034.24 E 0.482 5156.65
7935.75 56.360 326.470 5260.88 5325.26 4006.99 N 3374.38 W 5980604.85 N 660988.06 E 0.736 5236.56
8031.74 56.490 326.450 5313.96 5378.34 4073.65 N 3418.56 W 5980670.52 N 660942.42 E 0.137 5316.23
8127.92 56.660 325.980 5366.94 5431 .32 4140.37 N 3463.20 W 5980736.24 N 660896.33 E 0.444 5396.23
8224.17 56.950 326.300 5419.64 5484.02 4207.25 N 3508.08 W 5980802.13 N 660850.00 E 0.410 5476.50
- ---- ------
14 December, 2001 - 15:18
Page 4 of 7
DrlllQuest 2.00.09.003
Sperry-Sun Drilling Services .
Survey Report for E-104
Your Ref: API 500292304900
Job No. AKZZ11195, Surveyed: 7 December, 2001
Alaska Drilling & Wells
North Slope Alaska PBU__WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 oott)
8320.30 57.600 327.050 5471.61 5535.99 4274.83 N 3552.50 W 5980868.71 N 660804.10 E 0.942 5557.04
8416.13 57.580 326.600 5522.97 5587.35 4342.54 N 3596.77 W 5980935.44 N 660758.35 E 0.397 5637.59
8512.45 57.790 326.310 5574.46 5638.84 4410.39 N 3641.76 W 5981002.28 N 660711.89 E 0.335 5718.69
8606.27 57.810 326.530 5624.46 5688.84 4476.53 N 3685.67 W 5981067.44 N 660666.54 E 0.200 5797.78 , ~--
8704.79 58.150 325.940 5676.69 5741.07 4545.97 N 3732.09 W 5981135.85 N 660618.60 E 0.614 5881.03
8800.00 58.170 325.120 5726.92 5791.30 4612.65 N 3777.87 W 5981201.51 N 660571.37 E 0.732 5961.71
8895.34 58.430 325.500 5777.02 5841.40 4679.35 N 3824.04 W 5981267.18 N 660523.76 E 0.435 6042.64
8992.11 58.790 324.980 5827.42 5891.80 4747.21 N 3871.13 W 5981333.99 N 660475.18 E 0.591 6125.07
9087.87 57.350 324.960 5878.07 5942.45 4813.76 N 3917.78 W 5981399.50 N 660427.08 E 1.504 6206.19
9183.62 57.680 325.260 5929.49 5993.87 4880.01 N 3963.98 W 5981464.72 N 660379.44 E 0.434 6286.79
9278.98 58.300 324.120 5980.04 6044.42 4945.99 N 4010.72 W 5981529.66 N 660331.27 E 1.204 6367.53
9374.98 58.900 323.900 6030.06 6094.44 5012.29 N 4058.87 W 5981594.89 N 660281.67 E 0.655 6449.39
9471.36 57.590 324.230 6080.78 6145.16 5078.64 N 4106.97 W 5981660.17 N 660232.13 E 1.390 6531.25
9567.00 57.800 323.840 6131.89 6196.27 5144.07 N 4154.44 W 5981724.54 N 660183.24 E 0.409 6612.01
9662.10 58.110 323.850 6182.35 6246.73 5209.16 N 4202.00 W 5981788.57 N 660134.26 E 0.326 6692.55
9757.65 58.170 323.740 6232.79 6297.17 5274.64 N 4249.94 W 5981852.98 N 660084.90 E 0.116 6773.64
9853.68 58.580 323.740 6283.14 6347.52 5340.57 N 4298.30 W 5981917.84 N 660035.10 E 0.427 6855.34
9948.53 58.560 323.920 6332.60 6396.98 5405.91 N 4346.06 W 5981982.11 N 659985.92 E 0.163 6936.21
10041.93 58.210 322.760 6381.56 6445.94 5469.71 N 4393.55 W 5982044.86 N 659937.04 E 1.122 7015.70
10138.58 58.180 323.240 6432.50 6496.88 5535.31 N 4442.98 W 5982109.36 N 659886.18 E 0.423 7097.81
-~
10234.47 57.730 321.940 6483.38 6547.76 5599.87 N 4492.36 W 5982172.82 N 659835.40 E 1.241 7179.07
10331.19 57.650 322.580 6535.08 6599.46 5664.51 N 4542.39 W 5982236.35 N 659783.96 E 0.565 7260.81
10426.79 56.990 325.780 6586.71 6651.09 5729.74 N 4589.48 W 5982300.53 N 659735.45 E 2.901 7341.17
10522.71 56.120 326.810 6639.57 6703.95 5796.32 N 4633.90 W 5982366.12 N 659689.59 E 1.275 7420.92
10618.15 56.310 326.120 6692.64 6757.02 5862.44 N 4677.72 W 5982431.26 N 659644.33 E 0.633 7499.95
10714.34 53.550 327.200 6747.91 6812.29 5928.20 N 4720.99 W 5982496.05 N 659599.62 E 3.013 7578.34
10810.42 53.420 327.300 6805.08 6869.46 5993.14 N 4762.77 W 5982560.06 N 659556.43 E 0.159 7655.17
10906.50 50.540 327.130 6864.25 6928.63 6056.77 N 4803.75 W 5982622.78 N 659514.07 E 3.001 7730.48
11002.23 49.100 325.690 6926.02 6990.40 6117.70 N 4844.20 W 5982682.80 N 659472.29 E 1.893 7803.34
11097.74 49.150 326.570 6988.52 7052.90 6177.66 N 4884.45 W 5982741.87 N 659430.73 E 0.699 7875.32
__n_--
14 December, 2001 - 15:18
Page 5 of 7
DrlllQuest 2.00.09.003
Sperry-Sun Drilling Services
Survey Report for E-104
Your Ref: API 500292304900
Job No. AKZZ11195, Surveyed: 7 December, 2001
.
Alaska Drilling & Wells
North Slope Alaska PBU_WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
11193.84 48.930 325.970 7051.52 7115.90 6238.01 N 4924.74 W 5982801.32 N 659389.12 E 0.524 7947.64
11289.54 47.930 325.490 7115.02 7179.40 6297.18N 4965.06 W 5982859.59 N 659347.52 E 1.110 8019.03
11385.47 47.400 324.970 7179.62 7244.00 6355.43 N 5005.50 W 5982916.94 N 659305.81 E 0.682 8089.80
11482.75 47.230 325.210 7245.57 7309.95 6414.08 N 5046.42 W 5982974.67 N 659263.61 E 0.252 8161.16 -~,
11578.64 50.110 323.190 7308.90 7373.28 6472.45 N 5088.55 W 5983032.11 N 659220.21 E 3.394 8233.07
11673.67 51 .780 324.110 7368.77 7433.15 6531.89 N 5132.29 W 5983090.57 N 659175.18 E 1.911 8306.81
11769.52 52.000 324.010 7427.93 7492.31 6592.95 N 5176.55 W 5983150.64 N 659129.59 E 0.244 8382.15
11864.94 52.330 324.240 7486.46 7550.84 6654.01 N 5220.71 W 5983210.73 N 659084.10 E 0.395 8457.43
11961.10 52.110 323.930 7545.37 7609.75 6715.56 N 5265.29 W 5983271.29 N 659038.18 E 0.342 8533.36
12056.52 51.960 323.710 7604.07 7668.45 6776.28 N 5309.70 W 5983331.02 N 658992.45 E 0.240 8608.52
12152.52 52.170 323.590 7663.09 7727.47 6837.27 N 5354.58 W 5983391.00 N 658946.24 E 0.240 8684.18
12247.95 52.230 322.940 7721.58 7785.96 6897.70 N 5399.68 W 5983450.43 N 658899.83 E 0.542 8759.55
12344.58 52.300 323.570 7780.71 7845.09 6958.93 N 5445.40 W 5983510.65 N 658852.78 E 0.521 8835.93
12439.91 50.040 323.200 7840.48 7904.86 7018.54 N 5489.69 W 5983569.27 N 658807.19 E 2.390 8910.15
12534.35 48.950 322.200 7901.82 7966.20 7075.66 N 5533.20 W 5983625.42 N 658762.44 E 1 .407 8981.94
12614.47 48.790 322.820 7954.52 8018.90 7123.54 N 5569.92 W 5983672.49 N 658724.67 E 0.616 9042.28
12684.00 48.790 322.820 8000.33 8064.71 7165.22 N 5601.53 W 5983713.46 N 658692.16 E 0.000 9094.57 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
-.
Magnetic Declination at Surface is 26.532° (27 -Nov-01 )
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 321.480° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 12684.00ft.,
The Bottom Hole Displacement is 9094.92ft., in the Direction of 321.983° (True).
--'-'.--.-----
14 December, 2001 - 15:18
Page 6 of 7
DrillQuest 2.00.09.003
North Slope Alaska
Comments
Measured
Depth
(ft)
12684.00
Sperry-Sun Drilling Services
Survey Report for E-104
Your Ref: API 500292304900
Job No. AKZZ11195, Surveyed: 7 December, 2001
Station Coordinates
TVD Northings Eastlngs
(ft) (ft) (ft)
8064.71
7165.22 N
Survey tool program for E-104
From
Measured Vertical
Depth Depth
(ft) (ft)
0.00
264.00
14 December, 2001 - 15:18
0.00
264.00
To
Measured Vertical
Depth Depth
(ft) (ft)
264.00
12684.00
264.00
8064.71
~~--
Comment
5601.53 W
Projected Survey
Survey Tool Description
Tolerable Gyro (E-104 Gyro)
AK-6 BP _IFR-AK (E-104)
Page 7 of 7
.
Alaska Drilling & Wells
PBU.- WOA E Pad
.-~
.-~
-.----.-.
DrlllQuest 2.00.09.003
-(
~',' -
(
p- ."r":"::'~:""\"~/':::""'::~:':':':¡t.:":::'.~,
~n".'¡'il~:t,:~~ ~ L ,J S
~¡;'~ "I ~y ,
18-Dec-01
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well E-104 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 384.05' MD
Window / Kickoff Survey , MD
Projected Survey: 12,684.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Su rvey Manager
RECEIVED
Attachment(s)
DEC 2 8 2001
Alaska Oil & (~as GOO$, Commlssior!
An(~~t)rag$
North Slope Alaska
Alaska Drilling & Wells
PBU_WOA E Pad, Slot E-104
E-104 MWD
Job No. AKMM11195, Surveyed: 7 December, 2001
--
SURVEY REPORT
17 December, 2001
Your Ref: AP/500292304900
Surface Coordinates: 5976672.84 N, 664449.52 E (70020' 33.2582" N, 148039' 55.0257" W)
Surface Coordinates relative to Project H Reference: 976672.84 N, 164449.52 E (Grid)
Surface Coordinates relative to Structure Reference: 3468.06 N, 1987.11 E (True)
Kelly Bushing: 64.38ft above Mean Sea Level
-~
spe....,....,y-su'l
DRILLING seAVIc:es
A Halliburton Company
Survey Ref: 5vy11049
Sperry-Sun Drilling Services .
Survey Report for E-1 04
Your Ref: API 500292304900
Job No. AKMM11195, Surveyed: 7 December, 2001
Alaska Drilling & Wells
North Slope Alaska PBU_WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
E-104 Gyro -
0.00 0.000 0.000 -64.38 0.00 O.OON 0.00 E 5976672.84 N 664449.52 E 0.00 Tolerable Gyro --
175.00 0.200 215.000 110.62 175.00 0.258 0.18W 5976672.59 N 664449.35 E 0.114 -0.09
' ~-- 264.00 0.250 210.000 199.62 264.00 0.558 0.36W 5976672.29 N 664449.17 E 0.060 -0.20 MWD Magnetic
E-104 MWD
384.05 1.890 258.920 319.64 384.02 1.158 2.44W 5976671.63 N 664447.11 E 1 .446 0.61
472.63 3.360 270.320 408.13 472.51 1.42 8 6.46W 5976671.28 N 664443.09 E 1.753 2.92
534.00 4.650 258.000 469.35 533.73 1.938 10.70 W 5976670.68 N 664438.87 E 2.515 5.15
623.00 6.500 256.000 557.93 622.31 3.908 19.11 W 5976668.53 N 664430.50 E 2.090 8.86
713.00 9.000 267.000 647.10 711.48 5.508 31.09 W 5976666.66 N 664418.56 E 3.218 15.06
775.19 11 .560 283.230 708.30 772.68 4.32 S 42.02 W 5976667.59 N 664407.61 E 6.178 22.78
839.00 13.730 286.560 770.56 834.94 0.70S 55.50 W 5976670.92 N 664394.05 E 3.586 34.02
934.24 16.800 287.720 862.43 926.81 6.71 N 79.45 W 5976677.81 N 664369.94 E 3.239 54.73
1029.86 17.460 289.150 953.81 1018.19 15.62 N 106.17 W 5976686.13 N 664343.04 E 0.819 78.34
1125.04 19.620 294.460 1044.05 1108.43 26.92 N 134.21 W 5976696.81 N 664314.76 E 2.878 104.65
1220.99 20.560 295.900 1134.16 1198.54 40.95 N 164.03 W 5976710.19 N 664284.64 E 1.107 134.20
1316.65 24.360 296.620 1222.55 1286.93 57.14 N 196.78 W 5976725.65 N 664251.53 E 3.983 167.26
1413.02 27.640 297.370 1309.15 1373.53 76.32 N 234.41 W 5976744.00 N 664213.49 E 3.421 205.71 ~.
1509.22 29.140 297.590 1393.78 1458.16 97.43 N 274.99 W 5976764.22 N 664172.46 E 1.563 247.49
1604.63 28.400 296.050 1477.41 1541.79 118.16 N 315.97 W 5976784.04 N 664131.04E 1.098 289.22
1700.65 29.980 299.110 1561.24 1625.62 139.86 N 357.45 W 5976804.82 N 664089.09 E 2.263 332.04
1797.21 31.710 298.430 1644.14 1708.52 163.68 N 400.84 W 5976827.69 N 664045.18 E 1.828 377.70
1892.70 31.660 299.090 1725.40 1789.78 187.81 N 444.81 W 5976850.85 N 664000.69 E 0.367 423.96
1987.77 30.760 298.440 1806.71 1871.09 211 .52 N 487.99 W 5976873.60 N 663957.00 E 1.011 469.41
2083.82 32.510 299.170 1888.48 1952.86 235.80 N 532.13 W 5976896.91 N 663912.34 E 1.865 515.89
2178.52 35.580 299.550 1966.94 2031.32 261.79 N 578.33 W 5976921.89 N 663865.59 E 3.250 565.00
2273.72 36.350 299.100 2043.99 2108.37 289.18 N 627.08 W 5976948.19 N 663816.25 E 0.855 616.78
2369.45 39.590 303.920 2119.47 2183.85 320.01 N 677.20 W 5976977.92 N 663765.46 E 4.586 672.13
2464.95 42.400 307.060 2191.55 2255.93 356.41 N 728.16 W 5977013.19 N 663713.71 E 3.648 732.34
2560.44 44.410 310.250 2260.93 2325.31 397.41 N 779.37 W 5977053.05 N 663661.62 E 3.114 796.31
--- ------nm._.___--
17 December, 2001 - 10:15
Page 2 of 7
Dr/llQuest 2.00.09.003
Sperry-Sun Drilling Services .
Survey Report for E-1 04
Your Ref: AP/500292304900
Job No. AKMM11195, Surveyed: 7 December, 2001
Alaska Drilling & Wells
North Slope Alaska PBU_WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
2657.43 47.660 313.480 2328.26 2392.64 444.02 N 831.30 W 5977098.51 N 663608.68 E 4.119 865.12
2753.74 50.520 320.020 2391.36 2455.74 497.03 N 881.05 W 5977150.43 N 663557.78 E 5.927 937.58
2850.18 52.040 322.490 2451.69 2516.07 555.72 N 928.12 W 5977208.07 N 663509.43 E 2.545 1012.81
2945.04 52.770 321.370 2509.57 2573.95 614.89 N 974.47 W 5977266.20 N 663461.80 E 1.211 1087.97 _.
3032.98 52.870 319.500 2562.71 2627.09 668.90 N 1019.09 W 5977319.22 N 663416.00 E 1.698 1158.02
3129.49 52.660 324.490 2621.13 2685.51 729.41 N 1066.38 W 5977378.68 N 663367.39 E 4.122 1234.81
3226.06 52.650 326.940 2679.72 2744.10 792.83 N 1109.62 W 5977441.14 N 663322.77 E 2.017 1311.36
3320.99 51.850 327.490 2737.84 2802.22 855.93 N 1150.27 W 5977503.33 N 663280.75 E 0.959 1386.05
3417.29 52.890 327.360 2796.63 2861.01 920.20 N 1191.33 W 5977566.69 N 663238.29 E 1.085 1461.90
3513.11 52.560 328.600 2854.67 2919.05 984.84 N 1231.76 W 5977630.43 N 663196.45 E 1.086 1537.66
3607.51 53.480 328.050 2911.45 2975.83 1049.02 N 1271.36 W 5977693.72 N 663155.46 E 1.080 1612.53
3703.49 55.600 327.000 2967.13 3031.51 1114.96 N 1313.34 W 5977758.72 N 663112.04 E 2.382 1690.27
3799.24 57.930 325.020 3019.61 3083.99 1181.35 N 1358.12W 5977824.11 N 663065.81 E 2.985 1770.10
3894.31 57.460 324.420 3070.42 3134.80 1246.94 N 1404.53 W 5977888.67 N 663017.97 E 0.727 1850.32
3991.45 56.610 324.820 3123.27 3187.65 1313.39 N 1451.72 W 5977954.07 N 662969.34 E 0.941 1931 .70
4086.87 56.320 326.950 3175.99 3240.37 1379.23 N 1496.33 W 5978018.92 N 662923.30 E 1.885 2010.99
4182.56 55.450 325.240 3229.66 3294.04 1444.98 N 1540.51 W 5978083.68 N 662877.68 E 1.736 2089.95
4279.02 55.170 326.370 3284.56 3348.94 1510.58 N 1585.09 W 5978148.29 N 662831.68 E 1.006 2169.04
4374.75 55.210 326.490 3339.21 3403.59 1576.07 N 1628.55 W 5978212.81 N 662786.79 E 0.111 2247.35
4470.78 54.370 327.440 3394.58 3458.96 1641.85 N 1671.32 W 5978277.63 N 662742.58 E 1.191 2325.44
~
4566.80 53.540 328.290 3451.08 3515.46 1707.59 N 1712.62 W 5978342.45 N 662699.85 E 1.122 2402.60
4662.57 55.220 326.600 3506.86 3571.24 1773.19 N 1754.52 W 5978407.12 N 662656.53 E 2.266 2480.02
4758.35 54.690 326.850 3561.86 3626.24 1838.75 N 1797.54 W 5978471.72 N 662612.08 E 0.593 2558.11
4853.45 54.330 327.040 3617.07 3681.45 1903.65 N 1839.78 W 5978535.67 N 662568.43 E 0.412 2635.19
4948.43 57.230 326.390 3670.48 3734.86 1969.29 N 1882.88 W 5978600.35 N 662523.89 E 3.105 2713.39
4979.90 57.580 325.650 3687.43 3751.81 1991.28 N 1897.70 W 5978622.01 N 662508.60 E 2.272 2739.82
5063.19 58.120 325.470 3731.75 3796.13 2049.43 N 1937.58 W 5978679.28 N 662467.45 E 0.674 2810.16
5158.79 58.650 326.510 3781.87 3846.25 2116.92N 1983.11 W 5978745.75 N 662420.45 E 1.080 2891 .32
5253.99 59.260 325.360 3830.96 3895.34 2184.48 N 2028.80 W 5978812.29 N 662373.29 E 1.217 2972.63
5349.4 7 59.900 325.310 3879.31 3943.69 2252.20 N 2075.63 W 5978878.97 N 662324.98 E 0.672 3054.78
.----. --_uu-u,,---_-nu-
17 December, 2001 - 10:15
Page 3 of 7
DrillOuest 2.00.09.003
Sperry-Sun Drilling Services .
Survey Report for E-104
Your Ref: API 500292304900
Job No. AKMM11195, Surveyed: 7 December, 2001
Alaska Drilling & Wells
North Slope Alaska PBU_WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
5446.67 60.200 325.810 3927.83 3992.21 2321.66 N 2123.26 W 5978947.37 N 662275.84 E 0.542 3138.79
5542.18 60.460 325.300 3975.11 4039.49 2390.10 N 2170.20 W 5979014.76 N 662227.41 E 0.538 3221.57
5637.47 60.760 325.490 4021.88 4086.26 2458.44 N 2217.35 W 5979082.04 N 662178.77 E 0.360 3304.40
5733.87 58.520 325.370 4070.60 4134.98 2526.93 N 2264.55 W 5979149.48 N 662130.09 E 2.326 3387.38 _-°.
5829.08 58.050 325- 790 4120.65 4185.03 2593.74 N 2310.33 W 5979215.27 N 662082.85 E 0.620 3468.16
5924.53 57.860 324.500 4171.29 4235.67 2660.13 N 2356.56 W 5979280.63 N 662035.17 E 1.163 3548.90
6020.55 58.550 324.190 4221.88 4286.26 2726.44 N 2404.14 W 5979345.89 N 661986.16E 0.769 3630.41
6116.60 58.760 324.890 4271.85 4336.23 2793.25 N 2451.72 W 5979411.64 N 661937.11E 0.660 3712.32
6212.07 58.380 324.690 4321.63 4386.01 2859.81 N 2498.69 W 5979477.15 N 661888.70 E 0.436 3793.65
6307.84 57.940 324.500 4372.16 4436.54 2926.13 N 2545.83 W 5979542.42 N 661840.12E 0.489 3874.89
6403.05 57.660 324.420 4422.89 4487.27 2991.68 N 2592.66 W 5979606.93 N 661791.86 E 0.303 3955.34
6498.71 57.780 324.660 4473.98 4538.36 3057.56 N 2639.58 W 5979671.76 N 661743.51 E 0.246 4036.10
6594.38 57.370 323.920 4525.28 4589.66 3123.13 N 2686.71 W 5979736.28 N 661694.95 E 0.781 4116.76
6689.95 57.180 324.300 4576.94 4641.32 3188.27 N 2733.84 W 5979800.37 N 661646.40 E 0.389 4197.07
6786.53 56.940 324.390 4629.46 4693.84 3254.13 N 2781.09 W 5979865.18 N 661597.72 E 0.261 4278.03
6882.22 56.930 324.680 4681.67 4746.05 3319.44 N 2827.62 W 5979929.45 N 661549.77 E 0.254 4358.11
6977.01 57.040 323.980 4733.31 4797.69 3384.01 N 2873.97 W 5979992.99 N 661502.01 E 0.630 4437.49
7074.53 56.910 325.540 4786.47 4850.85 3450.79 N 2921.14 W 5980058.72 N 661453.38 E 1.348 4519.12
7170.23 56.880 324.680 4838.74 4903.12 3516.54 N 2967.00 W 5980123.45 N 661406.10 E 0.753 4599.12
7265.52 56.870 324.450 4890.81 4955.19 3581.56 N 3013.27 W 5980187.44 N 661358.41 E 0.202 4678.81
--
7360.88 56.790 325.450 4942.98 5007.36 3646.91 N 3059.11 W 5980251.77 N 661311.15 E 0.882 4758.48
7456.82 56.550 325.710 4995.70 5060.08 3713.03 N 3104.42 W 5980316.88 N 661264.40 E 0.337 4838.44
7551.91 56.450 327.040 5048.18 5112.56 3779.06 N 3148.32 W 5980381.93 N 661219.05 E 1.171 4917.44
7648.15 56.470 326.210 5101.36 5165.74 3846.04 N 3192.45 W 5980447.93 N 661173.47 E 0.719 4997.33
7744.11 56.450 325.980 5154.38 5218.76 3912.43 N 3237.07 W 5980513.32 N 661127.41 E 0.201 5077.05
7839.30 56.070 326.190 5207.25 5271.63 3978.12 N 3281.23 W 5980578.02 N 661081.81 E 0.439 5155.95
7935.75 56.360 327.980 5260.89 5325.27 4045.41 N 3324.79 W 5980644.34 N 661036.79 E 1.571 5235.73
8031.74 56.490 327.880 5313.97 5378.35 4113.18 N 3367.25 W 5980711.16 N 660992.85 E 0.161 5315.20
8127.92 56.660 327.070 5366.95 5431 .33 4180.86 N 3410.41 W 5980777.88 N 660948.22 E 0.725 5395.03
8224.17 56.950 327.270 5419.65 5484.03 4248.54 N 3454.08 W 5980844.59 N 660903.08 E 0.348 5475.18
--- - -- -- .
._~-------_.
17 December, 2001 - 10: 15
Page 4 of 7
DrlllQuest 2.00.09.003
Sperry-Sun Drilling Services .
Survey Report for E-104
Your Ref: API 500292304900
Job No. AKMM11195, Surveyed: 7 December, 2001
Alaska Drilling & Wells
North Slope Alaska PBU_WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastings Rate Sect/on Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
8320.30 57.600 327.540 5471.62 5536.00 4316.67 N 3497.64 W 5980911.75 N 660858.03 E 0.716 5555.61
8416.13 57.580 327.040 5522.98 5587.36 4384.75 N 3541.36 W 5980978.85 N 660812.83 E 0.441 5636.10
8512.45 57.790 326.720 5574.47 5638.85 4452.92 N 3585.84 W 5981046.03 N 660766.86 E 0.355 5717.14
8606.27 57.810 327.780 5624.46 5688.84 4519.69 N 3628.79 W 5981111.84 N 660722.46 E 0.956 5796.13 -~
8704.79 58.150 326.520 5676.70 5741.08 4589.86 N 3674.10 W 5981181.00 N 660675.62 E 1.138 5879.25
8800.00 58.170 325.900 5726.93 5791.31 4657.08 N 3719.08 W 5981247.22 N 660629.18 E 0.554 5959.86
8895.34 58.430 325.950 5777.03 5841.41 4724.27 N 3764.53 W 5981313.39 N 660582.27 E 0.276 6040.73
8992.11 58.790 325.640 5827.43 5891.81 4792.59 N 3810.97 W 5981380.68 N 660534.34 E 0.462 6123.10
9087.87 57.350 325.540 5878.08 5942.46 4859.64 N 3856.89 W 5981446.70 N 660486.95 E 1.506 6204.16
9183.62 57.680 325.830 5929.50 5993.88 4926.35 N 3902.42 W 5981512.40 N 660439.97 E 0.429 6284.71
9278.98 58.300 324.670 5980.05 6044.43 4992.78 N 3948.51 W 5981577.81 N 660392.43 E 1.219 6365.39
9374.98 58.900 324.450 6030.07 6094.45 5059.54 N 3996.03 W 5981643.51 N 660343.47 E 0.655 6447.22
9471.36 57.590 325.490 6080.79 6145.17 5126.64 N 4043.07 W 5981709.56 N 660294.96 E 1.640 6529.01
9567.00 57.800 325.800 6131.90 6196.28 5193.38 N 4088.69 W 5981775.28 N 660247.89 E 0.351 6609.64
9662.10 58.110 324.910 6182.36 6246.74 5259.69 N 4134.52 W 5981840.57 N 660200.62 E 0.858 6690.06
9757.65 58.170 324.710 6232.80 6297.18 5326.02 N 4181.28 W 5981905.85 N 660152.41 E 0.189 6771.08
9853.68 58.580 323.580 6283.15 6347.53 5392.29 N 4229.18 W 5981971.06 N 660103.07 E 1.089 6852.76
9948.53 58.560 325.490 6332.62 6397.00 5458.20 N 4276.13 W 5982035.92 N 660054.68 E 1.718 6933.57
10041.93 58.210 322.920 6381.58 6445.96 5522.71 N 4322.65 W 5982099.40 N 660006.77 E 2.373 7013.01
10138.58 58.180 324.010 6432.52 6496.90 5588.70 N 4371 .54 W 5982164.30 N 659956.43 E 0.959 7095.09
--~~
10234.47 57.730 322.980 6483.40 6547.78 5654.04 N 4419.89 W 5982228.56 N 659906.66 E 1.024 7176.32
10331.19 57.650 323.350 6535.10 6599.48 5719.46 N 4468.90 W 5982292.89 N 659856.23 E 0.334 7258.03
10426.79 56.990 326.200 6586.73 6651.11 5785.18 N 4515.31 W 5982357.58 N 659808.39 E 2.602 7338.35
10522.71 56.120 327.370 6639.59 6703.97 5852.13 N 4559.15 W 5982423.56 N 659763.09 E 1.363 7418.04
10618.15 56.310 326.540 6692.66 6757.04 5918.62 N 4602.41 W 5982489.08 N 659718.39 E 0.750 7497.00
10714.34 53.550 327.380 6747.93 6812.31 5984.61 N 4645.34 W 5982554.11 N 659674.02 E 2.957 7575.36
10810.42 53.420 327.730 6805.10 6869.48 6049.77 N 4686.76 W 5982618.35 N 659631.17 E 0.323 7652.15
10906.50 50.540 327.540 6864.27 6928.65 6113.70 N 4727.28 W 5982681.37 N 659589.27 E 3.002 7727.39
11002.23 49.100 325.960 6926.04 6990.42 6174.87 N 4767.37 W 5982741.64 N 659547.85 E 1.963 7800.22
11097.74 49.150 326.880 6988.54 7052.92 6235.03 N 4807.31 W 5982800.92 N 659506.59 E 0.730 7872.17
--- ------~~--- -~ ~----------~----------~
17 December, 2001 - 10:15
Page 5 of 7
DrlllQuest 2.00.09.003
"
Sperry-Sun Drilling Services
Survey Report for E-104
Your Ref: API 500292304900
Job No. AKMM11195~ Surveyed: 7 December, 2001
.
Alaska Drilling & Wells
North Slope Alaska PBU_WOA E Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
11193.84 48.930 326.540 7051.54 7115.92 6295.70 N 4847.14 W 5982860.69 N 659465.44 E 0.352 7944.44
11289.54 47.930 326.350 7115.04 7179.42 6355.36 N 4886.71 W 5982919.48 N 659424.57 E 1.055 8015.76
11385.47 47.400 325.720 7179.64 7244.02 6414.18 N 4926.33 W 5982977.41 N 659383.67 E 0.735 8086.45
11482.75 47.230 324.320 7245.60 7309.98 6472.77 N 4967.32 W 5983035.08 N 659341.40 E 1.072 8157.82 ".........-
11578.64 50.110 323.360 7308.92 7373.30 6530.89 N 5009.82 W 5983092.26 N 659297.65 E 3.096 8229.76
11673.67 51.780 324.300 7368.79 7433.17 6590.46 N 5053.36 W 5983150.86 N 659252.81 E 1.918 8303.49
11769.52 52.000 324.410 7427.95 7492.33 6651.75 N 5097.31 W 5983211.17 N 659207.52 E 0.247 8378.81
11864.94 52.330 324.970 7486.47 7550.85 6713.24 N 5140.87 W 5983271.70 N 659162.63 E 0.578 8454.05
11961.10 52.110 324.920 7545.39 7609.77 6775.46 N 5184.52 W 5983332.94 N 659117.62 E 0.232 8529.91
12056.52 51.960 324.590 7604.09 7668.47 6836.90 N 5227.93 W 5983393.41 N 659072.87 E 0.315 8605.02
12152.52 52.170 324.260 7663.1 0 7727.48 6898.48 N 5271.98 W 5983454.01 N 659027.48 E 0.348 8680.63
12247.95 52.230 323.680 7721.59 7785.97 6959.46 N 5316.33 W 5983514.01 N 658981.80 E 0.484 8755.97
12344.58 52.300 323.900 7780.73 7845.11 7021.12 N 5361.48 W 5983574.66 N 658935.31 E 0.194 8832.32
12439.91 50.040 323.720 7840.50 7904.88 7081.05 N 5405.32 W 5983633.62 N 658890.16 E 2.375 8906.52
12534.35 48.950 322.650 7901.84 7966.22 7138.54 N 5448.35 W 5983690.15 N 658845.89 E 1 .440 8978.29
12614.47 48.790 323.010 7954.54 8018.92 7186.63 N 5484.81 W 5983737.42 N 658808.38 E 0.393 9038.62
12684.00 48.790 323.010 8000.35 8064.73 7228.41 N 5516.28 W 5983778.50 N 658776.00 E 0.000 9090.91 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
~
Magnetic Declination at Surface is 26.532° (27-Nov-01)
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 321.4800 (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 12684.00ft.,
The Bottom Hole Displacement is 9092.81ft, in the Direction of 322.6510 (True).
17 December, 2001 - 10:15
Page 6 of 7
DrlllQuest 2.00.09.003
Sperry-Sun Drilling Services
Survey Report for E-104
Your Ref: API 500292304900
Job No. AKMM11195, Surveyed: 7 December, 2001
.
North Slope Alaska
Alaska Drilling & Wells
PBU_WOA E Pad
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northlngs Eastlngs
(ft) (ft) (ft)
Comment
12684.00
8064.73
7228.41 N
5516.28 W
Projected Survey
~-,
-----
Survey tool program for E-104 MWD
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth
(ft) (ft)
Survey Tool Description
0.00
264.00
0.00
264.00
264.00
12684.00
264.00
8064.73
Tolerable Gyro (E-104 Gyro)
MWD Magnetic (E-104 MWD)
~~-
-- -----------
17 December, 2001 - 10: 15
Page 7 of 7
DrillQuest 2.00.09.003
2/20/2002
Scbl.bepger
NO. 1832
Alaska Data and Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
Company: Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field:
Midnight Sun
"'-'
~
CO
--{
~
LJ
Well
Job#
Log Description
Date
BL
Sepia
CD
-~
E-104 PSP INJECTION PROFILE 02/12/02 1 1
E-104 STATIC PRESSURE SURVEY 02/12/02 1 1
E-104 RST-C/WATER FLOW LOG 02/12/02 1 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
Date Delivered:
r~~ I~ P n .J- 1)002
.1""\.\ U L
Schlumberger DCS
3940 Arctic Blvd Suite 300
Anchorage AK 99503-5789
ATTN: Sherrie
Receive~ Ú- ~
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E Benson Blvd.
Anchorage AK 99508-4254
RECEIVED
Alaska Oil & Gas Cons. Commission
AndJorage
01/14/02
sc___erger
NO. 1720
Alaska Data and Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrle
Company: Alaska Oil & Gas Cons Comm
Aftn: Lisa Weepie
333 West 7th Ave, Suite. 100
Anchorage, AK 99501
Field:
Polaris,Borealis, Midnight Sun
--
Well
Job#
Log Description
Date
Color
Sepia
BL
CD
"-
W-201 aO/-os I LEAK DETECTION LOG 12/17/01 . 1 1
Z-101 doo -/lrJ~ PRODUCTION PROFILE 12/23/01 1 1
E-104 ~()I-~O sr 21524 USIT 12/11/01 2
.
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
Date Delivered:
RECEIVED
J/\N 1 5 2002
Alaska aJ & ~ßIImÏ88iÐA
Anchorage
Schlumberger DCS
3940 Arctic Blvd Suite 300
Anchorage AK 99503-5789
ATTN: Sherrie
Receive~ ~Cf1'~
BP Exploration (Alaska) Inc.
Petrotectnlcal Data Center LR2-1
900 E Benson Blvd.
Anchorage AK 99508-4254
[Fwd: E-l 04 Contingency]
.':'
t
"
,
~,
Subject: [Fwd: E-IO4 Contingency]
Date: Man, 10 Dec 2001 11: 10: 18 -0900
From: Winton Aubert <winton - aubert@admin.state.ak. us>
Organization: AOGCC
To: Jody J Colombie <jody_colombie@admin.state.ak.us>
L""".,.""""".""."""".."""""".".""""",."-""""""""",..".,,""","""""""""""""'-"""'_"""H"""""""""H"""""""_""'H""""m' """',,"",,H"""'H"". "'-"'m"m."m.",m..",.."m""""""'_"H""'H""_"""""'H""""""""-"'"""'HH"'" "H"H"""""""HH""""""".,",.""HH"."""'H".H""'H..,
Subject: RE: E-IO4 Contingency
Date: Sat, 8 Dec 2001 10:29:04 -0600
From: "Wesley, Dave E" <WesleyDE@BP.com>
To: "'Winton Aubert'" <winton - aubert@admin.state.ak.us>
Thank you Winton. I received a call from the rig last night; we have
sufficient Kuparuk to complete this well bore. Many thanks for your help and
fore thought in preparing for the contingency.
Regards,
Dave Wesley, Jr.
Operations Drilling Engineer
GPB Rotary Drilling
907 564 5773 Office
907 440 8631 Cell
907 564 4040 Fax
wesleyde@bp.com
-----Original Message-----
From: Winton Aubert [mailto:winton aubert@admin.state.ak.us]
Sent: Friday, December 07, 2001 5:02 PM
To: Wesley, Dave E
Cc: Thomas E Maunder
Subject: Re: E-104 Contingency
Dave,
AOGCC hereby acknowledges receipt of your procedure to plug for sidetrack
PBU Well E-104i, and
grants verbal approval for this operation. Please be reminded that a
completed Form 10-403
describing this plugging procedure is due in this office within three days.
We understand that
approval for this procedure is requested on an as-needed basis, dependent
upon results of work in
progress. Please keep this office apprised of actual well operations by
calling 793-1231. We
anticipate that approval of Form 10-401 for Well E-104ai will be obtained by
12/10/01 (Monday).
Thank you,
Winton Aubert
AOGCC
1 of 1
12/1 010 1 11 :06 AM
RE: E-104A Sidetrack
{
,
Subject: RE: E-IO4A Sidetrack
Date: Mon, 10 Dec 2001 14:02:15 -0600
From: "Hubble, Terrie L" <HubbleTL@BP.com>
To: "'lody Colombie'" <jody - colombie@admin.state.ak.us>
CC: "Wesley, Dave E" <WesleyDE@BP.com>
Thanks so much!
Terrie
-----Original Message-----
From: Jody Colombie [mailto:jody colombie@admin.state.ak.us]
Sent: Monday, December 10, 2001 11:03 AM
To: Hubble, Terrie L
Subject: Re: E-104A Sidetrack
Terrie:
The permit has been canceled.
your
name on it for pick up.
I have put the $100 check in a envelope with
Jody
"Hubble, Terrie L" wrote:
> Hi Jody,
>
> I was out on Friday, but I guess there was some 'jumping through hoops'..
> Apparently Tom or Winton told Dave Wesley that they needed a copy of a
> potential Sidetrack permit for E-l04A submitted. Dave did what he could
by
> handwriting a 10-401, and had a check cut and the package was taken over
to
> you folks.
not
> required after all.
was
> being held in case it was needed. As I
> after all, to use this Permit I need to
> send it back to me with the check or if
> cancellation. Thanks!
>
>
>
>
Anyway, this was just a contingency Permit to Drill that was
I need to know if this Permit was approved or if it
said, since it was not necessary
know whether or not you can just
I need to write a letter of
Terrie Hubble
GPB Drilling & Wells
564-4628, MB8-1, Cube 830
1 of!
12/10/0111:05 AM
12/07/2001 12:42 FAX 907 564 4040
bp EXPLORATION
~ 002
(i STATE OF ALASKA {'
ALASKA ¿.... AND GAS CONSERVATrON Cvlv1MISSION
PERMIT TO DRILL
20 AAC 25.005
1 a. Type of work
~
Drill: x
Re-Entry:
2. Name of Operator
BP Exploration (Alaska), Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519.6612
4. Location of well at surface
4889' NSL, 501' WEL, SEe 06, T11 N, R14E, UM
At top of productive intervaJ ~
X=660,OOO Y-S,983,690 Z=7991 ssTVD
At total depth
X=660,O14 Y=>5,983,804 Z=8087 ssTVD
12. Distance to nearest 13. Distance to nearest well
property line ~'
ADL 0282g.... ---\ fe~ E-10A Is 35' -pway @ 601' md, feet
16. To beØnpleted for d~ate<)~~J'
Kickoff é'eptlÍ::¡:O 0 /feet "\ \J -rt'aXTmum hole angle: 560
18. caSI~s' pr~ram/
~ Specifications
Hole Casing Weight Grade Coupling Length
~
Redrlll: x
Deepen:
1 b. Type of well
Service: X
to: .'
rf r-
...
- --
---- 14- "4"'-- a S/ð 4
f =V+" 7"
I-n#
~ 1- "bl
~ - ,., = . Z. I
Ig"
I-- JQ
ß1C--M rZ$Z-'
19. To be completed for Redrlll, Re-entry, and Deepen Operations,
Present well condition summary
Total depth: measured feet
true vertical feet
Effective depth:
measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
liner
Perforation depth:
Length
(3 ~I r
~,'Z-
Size
2..0 II cr/'-:5#-
q ~'~l 40.#
measured
.
Stratigraphic Test DE!Velopment 011:
Single Zone: x " Multiple Zone:
10. Field Bl1d Pool
Prudhoe Bay Fie'd I Midnight Sun
Exploratory:
Developement Gas:
5. Datum Elevation (DF or K8)
Plan RKBE=64.3' teet
6. Property Designation
«91.i' ~ 4-'
7. Unit or property Name
Prudhoe Bay Uni!
8, Well nu~sr/ 1:: t "
/ E - 10 4i 1:;; -"\. ö-\o:
9. APpr~f[) ~
14. Number of acres In property
~
11. Type Bond (see 2(; MC 25.025)
Number
2S 1 003(12630-277
Amount
15. Proposed depth (i.1D and lVD)
Z-Sh 0 12,527' md I 8,1 !i,2' tvd
17. Anticipated pressure (3ee 20 MC 25.035 (e)(2» .
Maxlmurn surface Zk,O'3 pslg At total depth (lVD) 7964 13'¡OO
.
Settln~ Depth
feet
þsig
Top
MD
Bottom
TVD MD TVD
IA r1l:£ e., ,/:' ::l
~ '/...,-./¿.,,'" . --'f V...-:.
'{, ,.,.,ü. c.e- I z.s Z,' I I :,z..
-'
QuanVty 01 cement
.
(Inolude stafle data)
.. ,. ..r ----...
.It
,#.".""7 of
,
'44- :5)( rlq'f~ '£1
'VIII ".. ~
L-N"V"' ,... C. ~
,¿
----
.
,. -
.
--..
Plugs (measured)
feet
feet
Junk (measured)
Cemented
Measured depth
'"rue vertical depth
f
I~?
3'117 '
zJgO~
57' bb I ,tS
(þ'1 /glgl I 67 1
1~3
~/z,'
true vertical
20. Attaohments: Filing fee: X Property Plat: BOP Sketch:
Drilling fluid program: Time vs. depth plot: Refraction analysis:
21. I herby cer~fy that the foregoing is true and correct to the best of my knowledge:
Title:
Commission Use Only
Permit Number, ", 0 """"¡ API number JAPprovaJ date
'i,n \ "" 'I . \, 50
[,'1.." ¡ ..,' \- .
CondItions of approval Samples requIred: (] Yes [] No Mud log required: [] Yes
Hydrogen sulfide measures [J Yes [] No Directional survey required [] Yes [J No
RequIred working pressure for BOPE [J 2M; [] 3M; [] 5M; [] 10M; [] 15M
Other:
Signed:
~,"'"
...'"".,..."..."'.".\\....".",.,~.,'"..-,.., "'"
Approved by
Form 10.401 Rev. 12.1.85
Dlverter Sketch:
Seabed report;
.
Drlllinu program: X
20 AAC 125;050 requirem~~ts:
,-
Date:
.
.
.-.
See cover letter
tor other requirements
[ ] No .. ....
. . - '-'-"--'~
Commissioner
by order of
the Commission
Date:
-
R £SfnE1u'fP f)
¡¡,., d".J
DEe 0 7 2001
AlasJ<a Oii &.C. (- if'." '. ,
. 1{1,:> \.;OH5, Lnmln¡ss/O,¡
4nChoraoe
bp
(
,j'
~
To:
Winton Aubert - AOGCC
Date:
December 10, 2001
From:
Dave Wesley - BPXA GPB Rotary Drilling
Subject:
Reference:
E-104 Application for Sundry Approval - Plugging for Sidetrack Operations
API # 50-029-23049
Approval is requested for the proposed plugging, with intent to sidetrack, of Midnight Sun well E-104. The
original hole, which reached TD at 12863' md, 8140' tvd, was determined to have insufficient vertical pay
in the Kuparuk formation. It is proposed to plug back the original hole and sidetrack at approximately
10,000' md to an alternate bottom hole location 1400' East of the current bottom hole location.
As outlined in the scope of operations below, the sidetrack kick-off point is in the 8 %" open hole section at
approximately 10,000' md.
~
Pre-Sidetrack Work:
* Notify the field AOGCC representative with intent to plug and sidetrack *
1. Circulate 2 complete hole volumes in preparation for setting a cement kickoff plug/plugs.
2. Determine from log data, interval/intervals which must be isolated with cement per State
Regulation 20 AAC 25.112. Cement must be placed from total depth to 100 feet above the top of
the uppermost significant hydrocarbon-bearing zone.
3. R/U and run in hole with 5" drill pipe and -500' of 3 %" open-ended stinger.
4. Set a balanced 15.8# cement plug to a top of x,xxxx'.
5. POOH to approximately 300' above the cement top. Circulate clean.
6. Pump a High Vis pill spacer to a top of - 10,300' md.
7. Pump a -500' balanced plug of 17.0# kickoff plug cement, with top at 9,800', minimally.
8. POOH to - 300' above cement top and circulate clean.
9. POOH. Wait on cement minimally 12 hours.
.~,' /'\ ¡ j f "c' '(
I L,'. ,'"
Ria Operations:
1. RIH with 8 %" LWD/MWD assembly.
2. Wash down to cement top and dress off to -10,000' md.
3. Sidetrack at a toolface of - 100° right of highside.
4. Drill ahead to a depth of -150' md below base Kuparuk, -12,527' md. Condition hole for casing
run, as needed. Minimally, circulate two full hole volumes. POOH laying down all 5" drill pipe.
5. Run and cement the 7" production casing as required to cover all significant hydrocarbon-bearing
intervals. Displace the casing with seawater during cementing operations and freeze protect the
7" x 9 5/8" annulus as required.
6. R/U Schlumberger e-line and make a Gauge ring / Junk basket run to TD.
7. Test the 7" casing to 4000 psi for 30 min.
8. Run a USIT log, as required for an Injector well.
E-104 Contingency Sidetrack Application for Sundry
f
9. Run the 4 1/2", L-80, NSCT connections, completion assembly. Test the production casing/tubing
annulus to 4000 psi and the tubing to 4000 psi.
10. Nipple down the BOPE. Nipple up and test the tree to 5000 psi.
11. Freeze protect the well to -3000' TVD (3700' MD) and secure; set BPV and test to 500 psi.
12. Rig down and move off.
Post-Ria Work:
1. MIRU slickline. Pull the ball and rod / RHC plug from 'X' nipple below the production packer and
install gas lift valves.
Dave Wesley
Operations Drilling Engineer
564-5773
E-104 Contingency Sidetrack Application for Sundry
DrillOuest' I
-
PBU- WOA E Pad
E-I04 Contingency WP02
~V-!iI.Jr11 North Slope Alaska
E:U~ULL.lriri~S&~':::~,=,,: BPXA
...~_.-_.._..
Proposal Data for E-104 Contingency WPO2
Well
Well
ft
True North
r Casing
12527.16ft MD
8151.98ftTVD
Total Depth: 12527.1611 MD. 8151.98ft TVD
i Vertical Origin:
i Horizontal Origin:
¡ Measurement Units:
! North Reference:
E-JO4A T/ C()nt;lIgell(1'
"'-----'----8055.30' TVD
711.'1.08 N. 4294.52 W
;
! Dogleg severity: Degrees per 100 feet (US)
i Vertical Section Azimuth: 2.4900
i Vertical Section Description: Well
¡ Vertical Section Origin: 0.00 N,D.DD E
7000
C\l
Q
7800.001 ~
~
c:
OJ
0)
c:
:0:
c:
8
..,.
Q
"""
Ûl
Dogleg
Rate
Vertical
Section
Eastings
Measured Inct. Azim. Vertical Northings
i Depth Depth
10000.00 56.000 324.005 6538.25 5324.09 N
10030.00 55.706 326.151 6555.09 5344.44 N
10590.56 49.868 8.147 6903.73 5760.90 N
12377.16 49.868 8.147 8055.30 7113.08 N
12527.16 49.868 8.147 8151.98 7226.60 N
5129.10
5148.82
5560.48
6919.79
7033.91
4372.35 W
4386.56 W
4488.1 0 W
4294.52 W
4278.27 W
6.000
6.000
0.000
0.000
6600
-~,
-..
Q)
$
-
en
0)
c:
€ 6200
0
Z
r
""""-
5800
~
/q,.
.... ...'f-Þi>~oo' ..... ..... .... """""""""" """"'" ..~~~.(~?~~,,!i.I':':~~:"'...v:'~~~~!.. ~?~...3?ft.~!>..
'TIe-on : Start Dir@6.0000/100ft : 10000.00ftMD.6538.25f1TVD
End Dir, Start Sail @ 49.868° : 10590.56ftMD,6903.73ftlVD
it:
0
0
><::t
II
..c:
u
c:
:;: 5400
~
ro
u
Cf)
Change Dir @ 6.0000/100ft: 10030.00ft MD, 6555.000 TVD
i .TI~ , Stort D;, @ 6.000"'00II , 10000.OOIIMD,653B.25ftTVD
Change Dir @6.0000/10OO : 10030.000 MD, 6555.09f1 TVD
6800
nd Dir, Start Sail @49.868" : 10590.56f1MD,6903.73f1lVD
'--"
-..
Q)
$
-
11000.00
~
~7.
Ocr (\o~ C"2 7654.~ .1Y.1? . .
-'6. ..'1'.1.....
~^ 1900(0) . .. . .. . .. . .. . .. ..
""11. ... ................... D ..... """'J'wb"",
.. .. . . .. .. . .. . ... ~ ¿;, ~ 12000 00 ,.,""~ """".1'i"'....""",., """" ""lib too"", ,
........... .... ... -I>. "'. . . .. ... . .. .'. . .. . . ""_>IT" n ,
..... ... .. .... "~ro.. .. ....... .. .. .,.. 'KOParuk Lower UI ,
.... K -.... ....... ...., "
. .. .... .... Ii" ." "" ." :: : ::: . . :",,;; ;; .. "Bil!j"'l'¡!¡)'t ",...,om'
;;;:;;;;;;;;;;;;;;.;;;;;;;;;;;;;;:;;;;;;;:;;;;¡¡¡;;~¡;;;;¡;¡;¡;;;;;;:";~~~~Ó!¿¿::::;:;:::::::::..... Dngma,
..r:
ë.
Q)
0 7600
- it:
COo
00
.- CO
'ä511
>£
.5
-4600 -4200 -3800 -3400
Scale: 1 inch = 400ft Reference is True North
Eastings (Well)
Current Well Properties
----..----.-----....-....---......... ..._..h..._.......-...."...-....--.....-....-...--""-"
¡Well:
i Horizontal Coordinates:
! Ref. Global Coordinates:
i Ref. Structure Reference :
! Ref. Geographical Coordinates :
I RKB Elevation:
I
¡
!
! North Reference:
! Units:
E-104 Contingency WP02
5976672.84 N. 664449.52 E
3468.06 N, 1987.11 E
70020' 33.2582" N, 148039' 55.0257" W
.....
:rotal Depth: 12527.100 MD, 8151.900 TVD
Ecl04A Tl Co1l1ingel/è)!
8055.30' TrD /'"
7113.1)8 iV, 4294.52 IV
Q)
~ 8400
Cf)
64.30ft above Mean Sea level
54.30ft above Structure Reference
6400 7200 8000
Section Azimuth: 2.4900 (True North)
Vertical Section (Well)
4800 5600
Scale: 1 inch = 800ft
True North
Feet (US)
~~"~.._..' ^ ^^ ^^ ^^^
Sperry- un rill; g erv;
Proposal Data - E-104 WPS - E-104 Contingency WPO2
Draft Copy
MD I Delta Inclin. Azimuth TVD Delta Northings Eastings Dogleg A. Build I A. Turn Toolface
(ft) M D (ft) (O) (O) (ft) TVD (ft) (ft) (ft) (O /1 Daft) 010aft) (O /1 OOft) C)
, I
---="1---'10ÖOÖ:OO ~--'--56~ÓQ-324.01- 6538.25-~---'-5324.09-N4372.35W ------------------ .,..--- --:
2 10030.001 30.00 55.71 326.15 6555.09 16.84: 5344.44N' 4386.56W 6.00 -0.98: 7.15 100.00'
3 1.0590.56 560.56 49,87 8.156903.73 348.64 5760.90N 4488.10W 6.00 -1.04 7.49 112.54
4T 12377.16 1786.61 49.87 8;15 8055.30 1151.57 7113.08N 4294.52W 0.00 0.00 0.00 0.00
I 5 12527.16: 150.00 49.87 8.15 8151.98 96.68 7226.60N 4278.27W 0.00 0.00' 0.00 0.00
6 December, 2001 - 7:24
- 1 -
VS (2")
(ft)
- --- --
5129.1
5148.8
5560.5
6919.8
7033.9
DrillQuest
~~~
PROPOSAL REPORT
6 December, 2001
-°,
Surface Coordinates: 5976672.84 N, 664449.52 E (70020' 33.2582" N, 148039' 55.0257" W)
Surface Coordinates relative to Project H Reference: 976672.84 N, 164449.52 E (Grid)
Surface Coordinates relative to Structure Reference: 3468.06 N, 1987.11 E (True)
Kelly Bushing: 64.30ft above Mean Sea Level
sp E!r'T1\f-ElUl'l
!!:J..~.itl,..,..~ "rt~,.._...$..1ì;E, F!lV ~I!i;;,..$
ï:.'iiõfitE.81u CI:np;¡;f'!;'
Proposal Ref: pro11033
Sperry-Sun Drilling Services
Proposal Report for E-104 WPS - E-104 Contingency WP02
Revised: 6 December, 2001
Alaska Drilling & Wells
North Slope Alaska PBU_WOAE Pad
Measured Sub-Sea Vertical Local Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft). (ft) (o/100ft)
10000.00 56.000 324.005 6473.95 6538.25 5324.09 N 4372.35 W 5129.10 Tie-on: Start Dir @ 6.000o/100ft :
1 0000.00ftMD.6538.25ftTVD
10030.00 55.706 326.151 6490.79 6555.09 5344.44 N 4386.56 W 6.000 5148.82 Change Dir @ 6.000o/1O0ft: ---'-
10030.00ft MD, 6555.09ft TVD
10100.00 54.188 330.936 6531.01 6595.31 659915.80 E 6.000 5196.32
10200.00 52.365 338.070 6590.85 6655.15 659879.71 E 6.000 5266.99
10300.00 50.991 345.517 6652.91 6717.21 659853.56 E 6.000 5340.27
10400.00 50.107 353.205 6716.51 6780.81 5982188.72 N 659837.63 E 6.000 5415.36
10500.00 49.741 1.034 6780.94 6845.24 5982264.93 N 659832.10 E 6.000 5491.44
10590.56 49.868 8.147 6839.43 6903.73 5982333.90 N 659836.13 E 6.000 5560.48 End Dir, Start Sail @ 49.868" :
1 0590.56f1MD.6903. 73ftTVD
10600.00 49.868 8.147 4487.08 W 5982341.07 N 659836.99 E 0.000 5567.66
10700.00 49.868 8.147 4476.24 W 5982416.98 N 659846.16 E 0.000 5643.75
10800.00 49.868 8.147 6974.43 5919.42 N 4465.41 W 5982492.88 N 659855.34 E 0.000 5719.83
10900.00 49.868 8.147 7038.89 5995.10 N 4454.57 W 5982568.78 N 659864.51 E 0.000 5795.91
11000.00 49.868 8.147 7103.34 6070.79 N 4443.74 W 5982644.69 N 659873.68 E 0.000 5872.00
11100.00 49.868 8.147 7167.80 6146.47 N 4432.90 W 5982720.59 N 659882.85 E 0.000 5948.08
11200.00 49.868 8.147 7232.25 6222.15 N 4422.07 W 5982796.49 N 659892.03 E 0.000 6024.16
11300.00 49.868 8.147 7296.71 7361.01 6297.84 N 4411.23 W 5982872.40 N 659901.20 E 0.000 6100.25
11400.00 49.868 8.147 7361.16 7425.46 6373.52 N 4400.40 W 5982948.30 N 659910.37 E 0.000 6176.33
11500.00 49.868 8.147 7425.62 7489.92 6449.21 N 4389.56 W 5983024.20 N 659919.54 E 0.000 6252.41
11600.00 49.868 8.147 7490.08 7554.38 6524.89 N 4378.73 W 5983100.11 N 659928.72 E 0.000 6328.50 -~
11700.00 49.868 8.147 7554.53 7618.83 6600.57 N 4367.89 W 5983176.01 N 659937.89 E 0.000 6404.58
11770.54 49.868 8.147 7600.00 7664.30 6653.96 N 4360.25 W 5983229.55 N 659944.36 E 0.000 6458.25 CM2
1 1800.00 49.868 8.147 7618.99 7683.29 6676.26 N 4357.06 W 5983251.91 N 659947.06 E 0.000 6480.66
11900.00 49.868 8.147 7683.44 7747.74 6751.94 N 4346.22 W 5983327.82 N 659956.23 E 0.000 6556.75
12000.00 49.868 8.147 7747.90 7812.20 6827.63 N 4335.39 W 5983403.72 N 659965.41 E 0.000 6632.83
12100.00 49.868 8.147 7812.35 7876.65 6903.31 N 4324.55 W 5983479.63 N 659974.58 E 0.000 6708.91
12111.87 49.868 8.147 7820.00 7884.30 6912.29 N 4323.26 W 5983488.63 N 659975.67 E 0.000 6717.94 CM1fTHRZ
12200.00 49.868 8.147 7876.81 7941.11 6978.99 N 4313.72 W 5983555.53 N 659983.75 E 0.000 6785.00
12276.32 49.868 8.147 7926.00 7990.30 7036.75 N 4305.45 W 5983613.46 N 659990.75 E 0.000 6843.06 Base HRZfTop Kalubik (pebbly shale)
12284.07 49.868 8.147 7931.00 7995.30 7042.62 N 4304.61 W 5983619.34 N 659991.46 E 0.000 6848.96 Top KuparukfTop Kup. Upper Unit
12300.00 49.868 8.147 7941.27 8005.57 7054.68 N 4302.88 W 5983631.43 N 659992.92 E 0.000 6861.08
6 December. 2001 - 8:38
Page 2 of 5
DrillQuest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for E-104 WPS - E-104 Contingency WPO2
Revised: 6 December, 2001
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates
Depth locI. Azim. Depth Depth Northings Eastings
(ft) (ft) (rt) (ft) (ft)
12335.27 49.868 8.147 7964.00 8028.30 7081.37 N 4299.06 W
12377.16 49.868 8.147 7991.00 8055.30 7113.08 N 4294.52 W
12400.00 49.868 8.147 8005.72 8070.02 7130.36 N
12406.64 49.868 8.147 8010.00 8074.30 7135.39 N
12500.00 49.868 8.147 8070.18 8134.48 7206.05 N
~ ~
12527.16 49.868 8.147 8087.68 8151.98
Global Coordinates
Northings Eastings
(ft) ~ (ft)
660002.09 E
660002.70 E
660011.27 E
5983803.85 N
660013.76 E
All data is in Feet (US) unless otherwise stated. Directi
Vertical depths are relative to Well. Northings and
Magnetic Declination at Surface is 26.532° (O6-Dec-
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 2.490c (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 12527.16ft.,
The Bottom Hole Displacement is 8398.06ft, in the Direction of 329.374° (True).
Alaska Drilling & Wells
PBU_WOAE Pad
Dogleg Vertical
Rate Section Comment
(O/100ft)
0.000 6887.91 Kuparuk Lower Unit
0.000 6919.79 BKUPfTML V
Target - E-104A T1 Contingency, ,~
Drillers
0.000 6937.16
0.000 6942.21 Original GOC
0.000 7013.25
0.000 7033.91 Total Depth: 12527.16ft MD, 8151.98'
TVD
7" Casing
-'-
6 December. 2001 - 8:38
Page 3 of 5
Dri//Quest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for 1:-104 WPS - E-104 Contingency WP02
Revised: 6 December, 2001
North Slope Alaska
Alaska Drilling & Wells
PBU_WOAE Pad
Comments
Measured
Depth
eft)
Station Coordinates
TVD Northings Eastings
(ft) . (ft) (ft)
10000.00
10030.00
10590.56
12527.16
6538.25
6555.09
6903.73
8151.98
5324.09 N
5344.44 N
5760.90 N
7226.60 N
Comment
.-"
4372.35 W
4386.56 W
4488.10 W
4278.27 W
Tie-on : Start D'
Change Dir
End Dir, Start
,th : 1
Formation Tops
Formati on Plane
(Below Well Origin)
Sub-Sea Dip Dip Dir. Northings Eastings Formation Name
(ft) Deg. Deg. (ft) (ft)
6415.00 0.000 1.257 5253.38 N 4320.99 W CM3 (top Colville, base West Sak)
7600.00 0.000 1.257 6653.96 N 4360.25 W CM2
7820.00 0.000 1.257 6912.29 N 4323.26 W CM1/THRZ
7926.00 0.000 1.257 7036.75 N 4305.45 W Base HRZ/Top Kalubik (pebbly shale)
7931.00 0.000 1.257 7042.62 N 4304.61 W Top Kuparuk/Top Kup. Upper Unit
7964.00 0.000 1.257 12335.27 8028.30 7964.00 7081.37 N 4299.06 W Kuparuk Lower Unit
7991.00 0.000 1.257 12377.16 8055.30 7991.00 7113.08 N 4294.52 W BKUP/TMLV
8010.00 0.000 1.257 12406.64 8074.30 8010.00 7135.39 N 4291.33 W Original GOC
~.,
6 December. 2001 - 8:38
Page 4 of 5
DrillQuest 2.00.09.006
North Slope Alaska
Casing details
From
Measured Vertical
Depth Depth
(ft) (ft)
<Surface>
10000.00
<Surface>
6538.25
Targets associated with this weJ/path
Target
Name
E-104A T1 Contingency
Sperry-Sun Drilling Services
Proposal Report for E-104 WPS - E-104 Contingency WP02
Revised: 6 December, 2001
To
Measured Vertical
Depth Depth
{ft} (ft)
5101.96
12527.16
Casing Detail
3799.30
8151.98
9 5/8" Casing
7" Casing
Target
Shape
Point
Alaska Drilling & Wells
PBU- WOA E Pad
-'--'-
Target
Type
Drillers
'----,
6 December, 2001- 8:38
DrillQuest 2.00.09.006
Target Entry Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
ean Sea LeveVGlobal Coordinates:
Geographical Coordinates:
8055.30
7991.00
7113.08 N 4294.52 W
5983690.00 N 660000.00 E
70° 21' 43.2073" N 148042' 00.6116" W
Page 5 of 5
~
('
Sperry-Sun
Anticollision Report
, .. .. ,
C()I11P~ny: . BPAmCJCo ,,12/06/2001 ',.
Fjeld: ." .1' '. "PrudhoeBay , ' ,
Referen~eSite:RB'EPad ,I ' Well: ,E-1 04; True North
Refereòè~Wdl: ,,: E..l04. ,,' ' ",' <" 22:124/19/1982 OO:ÙO 64;3 .', "" ,
Refer,~.u:eW~llpath:R~~:E-1Q4.AJjontingerip~r , ," ", ' , , " ,",,' ," ""'", , Db: ' Oracle
GLOBAL SCAN APPLIED: All weUpaths within 200'+ 100/1000 of reference - There are ~, -. in this _cipal Plan & PLANNED PROGRAM I
Interpolation Method: MD Interval: 25.00 ft Error Model: ISCWSA Ellipse
Depth Range: 10000.00 to 12527.16 ft Scan Method: Trav Cylinder North
Maximum Radius: 1446.29 ft Error Surface: Ellipse + Casing
- -.- ----
Survey Program for Definitive Wellpath
Date: 11/27/2001 Validated: No
Planned From To Survey
ft ft
64.30 1002.30
1002.30 10000.00
10000.00 12527.16
Version:
Toolcode
2
Tool Name
.----------------------.--.-------------. ---------------- -----.-- --.-..-------
Planned: E-104A Contingenncy w CB-GYRO-SS Camera based gyro single shots
Planned: E-104A Contingenncyw MWD+IFR+MS MWD + IFR + Multi Station
Planned: E-104A Contingenncy w MWD+IFR+MS MWD + IFR + Multi Station
E-08
E-09A
E-09APB 1
E-09
E-100
E-102
E-102
E-103
E-104
E-10A
E-10
E-110
E-111
E-11APB1
E-11
E-11
E-11
E-12
E-31
E-31
E-34
Casing Points
Summary
----
."..j1~r...~j¡ .'I~~... .~iI,.:~~C'
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Pass: Major Risk
FAIL: Major Risk
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
..'..,;~#;.,.' " "~t]~?~~':?~~~,~~'I~~~~~ITj:e;+~~~~,j'!).'
'","",..,'," " ",'c"
,.,c',"'"","" '..'," ' ""
,,"""""" " ,",c"" ,', ","" " '.. ",',""',"" , ,
E-08 V1
E-09A V1
E-09APB1 V1
E-09 V1
E-100 V3
E-102 V14
Sidetrack VO Plan: E-1
E-103 V7 Plan: E-103 w
Plan E-104 V8 Plan: E-
E-10A V3
E-10 V1
E-110 V3 Plan: Definit
E-111 V2 Plan: Definit
E-11APB1 V3
E-11 V4
E-11A V4
Plan E-11B V17 Plan: E
E-12 V1
E-31 V2
Plan E-31A V25 Plan: E
E-34 V1
10962.95 12240.62 1253.72 283.27 1060.89
10024.99 10025.00 0.33 332.17 -325.18
PB E Pad
PB E Pad
PB E Pad
PB E Pad
PB E Pad
PB E Pad
PB E Pad
PB E Pad
PB E Pad
PB E Pad
PB E Pad
PB E Pad
PB E Pad
PB E Pad
PB E Pad
PB E Pad
PB E Pad
PB E Pad
PB E Pad
PB E Pad
PB E Pad
Site: PB E Pad
Well: E-103
Wellpath: E-103 V7 Plan: E-103 wp05 V1
Rule Assigned:
Inter-Site Error:
Major Risk
0.00 ft
10795.21 7035.49 11900.00 8127.64 42.59 38.44 179.70 171.55 4.500 1444.09 277.30 1282.72 Pass
10807.74 7043.57 11925.00 8126.16 42.61 38.57 180.33 172.18 4.500 1429.22 277.72 1265.81 Pass
10820.21 7051.60 11950.00 8124.59 42.62 38.69 180.97 172.82 4.500 1414.46 278.13 1248.97 Pass
10832.64 7059.61 11975.00 8122.96 42.64 38.81 181.62 173.47 4.500 1399.83 278.54 1232.21 Pass
10845.03 7067.60 12000.00 8121.27 42.65 38.93 182.29 174.14 4.500 1385.34 278.95 1215.55 Pass
10857.38 7075.56 12025.00 8119.53 42.66 39.05 182.96 174.81 4.500 1371.01 279.35 1199.00 Pass
10869.76 7083.54 12050.00 8117.69 42.68 39.17 183.65 175.50 4.500 1356.74 279.76 1182.48 Pass
10882.17 7091.54 12075.00 8115.74 42.69 39.29 184.35 176.20 4.500 1342.50 280.16 1165.97 Pass
10894.54 7099.51 12100.00 8113.71 42.71 39.41 185.06 176.91 4.500 1328.41 280.57 1149.55 Pass
10906.82 7107.42 12125.00 8111.63 42.72 39.53 185.78 177.63 4.500 1314.52 280.97 1133.29 Pass
10919.02 7115.29 12150.00 8109.54 42.74 39.66 186.53 178.38 4.500 1300.90 281.38 1117.23 Pass
.... ..._..........-. _... "-".-........... .................. .......... ........-....-......................-..... """"-"-"""""'-"".................-..""- """-""-"" ...............-............... ..... ..-... -"""""""""-""""'-........."""""""--"------""---"-""'-"-'-"-.m__--- '-""---""'-""""-"""-""-""""""""" ....... -..-.....--...............-..-...............-...-.....---..
(
Company: BP Amoco
: Fjeld: ..... . Prudh~Bay
RêfêrenceSite:. . . PBEPad.
Referent~W~D:J;-104 . . ....
Re(erenc«!Wellpatb: ..Plan:E-1 04A Contingency
Site: PB E Pad
Well: E-103
Wellpatb: E-103 V7 Plan: E-103 wp05 V1
Sperry-Sun
Anticollision Report
Date: 12/0612001
':1
\(
Time: 08:13:16
Page:
2
. .
Well:E-104¡ True North .
.22:124/19/198200:0064.3 ..
. Db: Oracle
Rule Assigned:
Inter-Site Error:
Major Risk
0.00 ft
I . Reference . Offset Semi-Major Axis Ctr-Ctr No-Go Allowable
MD TVD MD. TVD Ref Offset TFO+AZI TFO-HS Casing Distance Ar~a Deviation Warning
í ft ft ft ft ft ft deg deg in ft ft ft
10931.15 7123.11 12175.00 8107.45 42.75 39.75 187.30 179.15 4.500 1287.56 281.42 1101.41 Pass
10943.26 7130.92 12200.00 8105.35 42.77 39.81 188.08 179.93 4.500 1274.47 280.71 1085.80 Pass
10955.38 7138.72 12225.00 8103.26 42.78 39.86 188.88 180.73 4.500 1261.62 282.17 1070.40 Pass
10962.95 7143.60 12240.62 8101.95 42.79 39.89 189.39 181.24 4.500 1253.72 283.27 1060.89 Pass
Site:
Well:
Wellpath:
PB E Pad
E-104
Plan E-104 V8 Plan: E-104 wp02 V1
, .:~.¡¡~I.rl!i¡~~!~~;.
6538.14 49.78 50.02 144.00 0.00 8.500
6552.12 49.74 50.11 244.64 278.85 8.500
6566.10 49.68 50.17 247.59 280.09 8.500
6580.08 49.58 50.20 251.08 281.89 8.500
6594.06 49.49 50.21 253.61 282.70 8.500
10000.00
10024.99
10049.95
10074.85
10099.64
10124.30
10148.80
10173.10
10197.18
10221.00
10244.56
10267.81
10290.74
10313.33
10335.57
10357.43
10378.91
10400.00
10420.66
10440.93
10460.77
10480.19
10500.00
10517.77
10535.92
10553.64
10570.94
10590.56
10607.60
10627.98
10648.36
10668.74
10689.12
10709.50
10729.88
10750.26
10770.64
10791.02
10811.40
10831.78
10852.16
6538.14 10000.00
6552.16 10025.00
6566.29 10050.00
6580.57 10075.00
6594.98 10100.00
6609.49 10125.00
6624.07 10150.00
6638.69 10175.00
6653.31 10200.00
6667.90 10225.00
6682.44 10250.00
6696.91 10275.00
6711.26 10300.00
6725.49 10325.00
6739.56 10350.00
6753.46 10375.00
6767.17 10400.00
6780.67 10425.00
6793.94 10450.00
6806.98 10475.00
6819.77 10500.00
6832.31 10525.00
6845.10 10550.00
6856.59 10575.00
6868.32 10600.00
6879.77 10625.00
6890.94 10650.00
6903.59 10675.00
6914.57 10700.00
6927.71 10725.00
6940.84 10750.00
6953.98 10775.00
6967.11 10800.00
6980.25 10825.00
6993.38 10850.00
7006.52 10875.00
7019.66 10900.00
7032.79 10925.00
7045.93 10950.00
7059.06 10975.00
7072.20 11000.00
6608.04 49.34
6622.02 49.19
6636.00 49.00
6649.98 48.80
6663.96 48.57
6677.94 48.33
6691.92 48.06
6705.90 47.78
6719.88 47.48
6733.86 47.16
6747.84 46.84
6761.82 46.50
6775.80 46.16
6789.78 45.80
6803.76 45.44
6817.74 45.07
6831.72 44.70
6845.70 44.31
6859.68 43.94
6873.65 43.56
6887.63 43.19
6901.61 42.80
6915.59 42.37
6929.57 42.38
6943.55 42.41
6957.53 42.43
6971.51 42.45
6985.49 42.47
6999.47 42.50
7013.45 42.52
7027.43 42.54
7041.41 42.56
7055.39 42.59
7069.37 42.61
7083.35 42.63
7097.33 42.66
50.20 255.54 282.90
50.15 257.10 282.73
50.09 258.44 282.33
49.99 259.62 281.76
49.88 260.69 281.08
49.75 261.68 280.33
49.59 262.60 279.51
49.42 263.46 278.65
49.23 264.29 277.76
49.02 265.07 276.84
48.80 265.82 275.92
48.56 266.55 274.98
48.31 267.24 274.04
48.06 267.92 273.10
47.79 268.57 272.17
47.52 269.20 271.25
47.24 269.81 270.33
46.93 270.42 269.39
46.66 270.97 268.54
46.37 271.53 267.67
46.08 272.07 266.82
45.78 272.60 265.99
45.42 273.19 265.04
45.55 273.22 265.07
45.68 273.26 265.11
45.81 273.29 265.14
45.94 273.31 265.16
46.07 273.34 265.19
46.20 273.36 265.21
46.33 273.38 265.23
46.46 273.39 265.24
46.60 273.41 265.26
46.73 273.42 265.27
46.86 273.44 265.29
46.99 273.45 265.30
47.12 273.46 265.31
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
Rule Assigned:
Inter-Site Error:
Major Risk
0.00 ft
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
FAIL
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
.... .... """"""""""-"""""'" ..-..... """""",-""""",,"""""""'-""-'-'-"""""""""'"......... """'-""..-.. ...... ................... ................................................................. .... ... .-............. ....................... .... ... ... ........ .......-..... ............... ......... ................ """""""""""""""'" .................................. ... -""""""" ......-....... ....... ... """""""""","""-""""""""
Pass
0.00 332.37 -117.02
0.33 332.17 -325.18
1.30 332.22 -321.52
2.92 332.39 -315.71
5.19 332.39 -310.20
8.09 332.07 -304.56
11.64 331.56 -298.75
15.81 330.73 -292.39
20.61 329.70 -285.60
26.02 328.36 -278.14
32.03 326.81 -270.13
38.64 325.90 -261.44
45.83 324.89 -252.16
53.58 323.64 -242.23
61.90 322.15 -231.69
70.75 320.45 -220.57
80.13 318.51 -208.82
90.03 316.42 -196.57
100.42 314.40 -183.69
111.30 312.95 -170.33
122.66 311.30 -156.44
134.46 309.48 -142.05
146.71 307.42 -127.13
159.38 305.38 -111.92
172.47 303.12 -96.20
185.95 300.77
199.82 298.92
214.08 296.90
228.53 297.36
243.01 297.84
257.49 298.31
271.97 298.79
286.44 299.26
300.92 299.74
315.40 300.22
-80.10
-63.55
-46.18
-32.06
-17.94
-3.83
10.28
24.38
38.47
52.56
66.64
80.72
94.80
108.87
122.94
329.88 300.70
344.36 301.18
358.83 301.66
373.31 302.14
387.79 302.62
402.27 303.09
137.01
f
I,
Sperry-Sun
Anticollision Report
i(
. " .' "
COD1þany: . BP:Amoçb ". .
Field: . . . .PrûdhœB~y
. Reference$ite: ' PB'EPàd ':, '.
RderenceWèU: .' . E~104::~~.
Reference WeUpath: Plan: E-104A Contingency
Site: PB E Pad
Well: E-104
Wellpath: Plan E-104 V8 Plan: E-104 wp02 V1
Reference' , Offset '. SeltÛ.;MajOrAXis ..
MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing
ft ft ft ft ft ft deg deg in
10872.54 7085.33 11025.00 7111.31 42.68 47.25 273.47 265.32 8.500
10892.92 7098.47 11050.00 7125.29 42.71 47.38 273.48 265.33 8.500
10913.30 7111.61 11075.00 7139.27 42.73 47.51 273.49 265.34 8.500
10933.69 7124.74 11100.00 7153.25 42.75 47.64 273.50 265.35 8.500
10954.07
10974.45
10994.83
11015.21
11035.59
11055.97
11076.35
11096.73
11117.11
11137.49
11157.87
11178.25
11198.63
11219.01
11239.40
11259.78
11280.16
11300.54
11320.92
11341.30
11361.68
11382.06
11402.44
11422.82
11443.20
11463.58
11483.96
11504.34
11524.72
11545.10
11565.49
11585.87
11606.25
11626.63
11647.01
11667.39
11687.77
11708.15
11728.53
11748.91
11769.29
11789.67
11810.05
11830.43
11850.81
11871.20
11891.58
7137.88 11125.00
7151.01 11150.00
7164.15 11175.00
7177.29 11200.00
7190.42 11225.00
7203.56 11250.00
7216.69 11275.00
7229.83 11300.00
7242.96 11325.00
7256.10 11350.00
7269.24 11375.00
7282.37 11400.00
7295.51 11425.00
7308.64 11450.00
7321.78 11475.00
7334.92 11500.00
7348.05 11525.00
7361.19 11550.00
7374.32 11575.00
7387.46 11600.00
7400.59 11625.00
7413.73 11650.00
7426.87 11675.00
7440.00 11700.00
7453.14 11725.00
7466.27 11750.00
7479.41 11775.00
7492.55 11800.00
7505.68 11825.00
7518.82 11850.00
7531.95 11875.00
7545.09 11900.00
7558.22 11925.00
7571.36 11950.00
7584.50 11975.00
7597.63 12000.00
7610.77 12025.00
7623.90 12050.00
7637.04 12075.00
7650.18 12100.00
7663.31 12125.00
7676.45 12150.00
7689.58 12175.00
7702.72 12200.00
7715.85 12225.00
7728.99 12250.00
7742.13 12275.00
7167.23 42.78
7181.21 42.80
7195.19 42.83
7209.17 42.85
7223.15 42.88
7237.13 42.90
7251.11 42.93
7265.09 42.95
7279.07 42.98
7293.05 43.00
7307.03 43.03
7321.01 43.06
7334.99 43.08
7348.97 43.11
7362.95 43.13
7376.93 43.16
7390.91 43.19
7404.89 43.21
7418.87 43.24
7432.85 43.27
7446.83 43.30
7460.81 43.32
7474.79 43.35
7488.77 43.38
7502.75 43.41
7516.73 43.43
7530.71 43.46
7544.69 43.49
7558.67 43.52
7572.65 43.55
7586.63 43.58
7600.61 43.61
7614.59 43.64
7628.57 43.66
7642.55 43.69
7656.52 43.72
7670.50 43.75
7684.48 43.78
7698.46 43.81
7712.44 43.84
7726.42 43.87
7740.40 43.90
7754.38 43.93
7768.36 43.96
7782.34 44.00
7796.32 44.03
7810.30 44.06
. ..
.. .. . . . .
,. .., .... "
,Co~rdJnate(NE)Reference: Well:E-104.TrueNorth' .
Vertital (TVD)Reference:. . 22 : 12 4/19/1982 00:0064.3
Db: Oracle
47.77 273.51 265.36
47.91 273.52 265.37
48.04 273.53 265.38
48.17 273.53 265.38
48.30 273.54 265.39
48.43 273.55 265.40
48.56 273.55 265.40
48.69 273.56 265.41
48.82 273.56 265.41
48.95 273.57 265.42
49.08 273.57 265.42
49.21 273.58 265.43
49.35 273.58 265.43
49.48 273.59 265.44
49.61 273.59 265.44
49.74 273.59 265.44
49.87 273.60 265.45
50.00 273.60 265.45
50.13 273.61 265.46
50.26 273.61 265.46
50.39 273.61 265.46
50.53 273.61 265.46
50.66 273.62 265.47
50.79 273.62 265.47
50.92 273.62 265.47
51.05 273.63 265.48
51.18 273.63 265.48
51.31 273.63 265.48
51.44 273.63 265.48
51.57 273.64 265.49
51.70 273.64 265.49
51.83 273.64 265.49
51.97 273.64 265.49
52.10 273.64 265.49
52.23 273.65 265.50
52.36 273.65 265.50
52.49 273.65 265.50
52.62 273.65 265.50
52.75 273.65 265.50
52.88 273.66 265.51
53.01 273.66 265.51
53.15 273.66 265.51
53.28 273.66 265.51
53.41 273.66 265.51
53.54 273.66 265.51
53.67 273.67 265.52
53.80 273.67 265.52
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
Rule Assigned:
Tnter-Site Error:
Ctr;:;CtrNo~Go .
Distance Area
ft ft
416.75 303.58
431.23 304.06
445.70 304.54
460.18 305.02
474.66 305.50
489.14 305.99
503.62 306.47
518.10 306.95
532.58 307.44
547.05 307.92
561.53 308.41
576.01 308.89
590.49 309.38
604.97 309.86
619.45 310.35
633.92 310.84
648.40 311.32
662.88 311.81
677.36 312.30
691.84 312.79
706.32 313.28
720.80 313.77
735.27 314.26
749.75 314.75
764.23 315.24
778.71 315.73
793.19 316.22
807.67 316.71
822.14 317.21
836.62 317.70
851.10 318.19
865.58 318.68
880.06 319.18
894.54 319.68
909.02 320.17
923.49 320.66
937.97 321.16
952.45 321.66
966.93 322.15
981.41 322.65
995.89 323.15
1010.37 323.65
1024.84 324.14
1039.32 324.64
1053.80 325.14
1068.28 325.64
1082.76 326.14
1097.24 326.64
1111.72 327.14
1126.19 327.64
1140.67 328.14
Major Risk
0.00 ft
AlloWable
Deviation
ft
151.08
165.14
179.21
193.27
207.32
221.38
235.43
249.49
263.54
277.59
291.64
305.69
319.73
333.78
347.82
361.87
375.91
389.95
403.99
418.03
432.06
446.10
460.14
474.17
488.20
502.24
516.27
530.30
544.33
558.36
572.39
586.42
600.45
614.47
628.50
642.52
656.55
670.57
684.59
698.62
712.64
726.66
740.68
754.70
768.71
782.73
796.75
810.77
824.78
838.80
852.81
Warning
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
---"-",.-,.,,,"""""""'.""""'."""."'--""'.".""""-- ..-......-..- ............... ...-.-.... ",."-""-"'."""""'" ",."".,-"""""""",,"'-'-'.""'-""""'-""-"""""""""'" "-""'-".....""""""" ...........-.-...................,......-....""""""""."-".,."""-"""""",,,,,...-.-.. ....-. ...........-..............-.-....,.. "-""""." .................. ..... ............. ....- ..............
Pass
Pass
It
~:
l(
8 perry -8 un
Anticollision Report
. . ..
. . .
.Cò-:orlÌinat~E)Re fe rence:
. Veiðc~l (TVD)Reference: .
. . .. .
Well;E~104,TrueNorth . .
22:124/19/198200:0064.3 . ..
Db: Oracle
. . . . .. ...
COl1aÞíÖ~: .... . . :ßPA!t1oco ... . ..
Field: ... ¡... .... ... Pr:ucihoéSay
Rëfèrence.Site: ..... . PBEPact. ..
Reference Well: . . E;.104 ' .
Reference WeUpatb: Plan: E-104A Contingency
Site: PB E Pad
Well: E-104
Wellpatb: Plan E-104 V8 Plan: E-104 wp02 V1
. .. .
... Dåte::t2l06l2()01 .
Rule Assigned:
Inter-Site Error:
Major Risk
0.00 ft
c. Refèrence '.. Offset ...', , ',,' '.. . . Seoñ-Major AxiŠ' ..... ,..,. .. .,', "Cti':CtrNo':GO ".Allowable ,... ,'c.:
i
MD TVD MD TVD Ref Offset TFO+AZI TFO~BS Casing Distance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
11911.96 7755.26 12300.00 7824.28 44.09 53.93 273.67 265.52 8.500 1155.15 328.65 866.83 Pass
11932.34 7768.40 12325.00 7838.26 44.12 54.06 273.67 265.52 8.500 1169.63 329.15 880.84 Pass
11952.72 7781.53 12350.00 7852.24 44.15 54.19 273.67 265.52 8.500 1184.11 329.65 894.85 Pass
11973.10 7794.67 12375.00 7866.22 44.18 54.32 273.67 265.52 8.500 1198.59 330.16 908.86 Pass
11993.48 7807.81 12400.00 7880.20 44.22 54.45 273.67 265.52 8.500 1213.07 330.66 922.88 Pass
12013.86 7820.94 12425.00 7894.18 44.25 54.59 273.67 265.52 8.500 1227.54 331.16 936.88 Pass
12034.24 7834.08 12450.00 7908.16 44.28 54.72 273.68 265.53 8.500 1242.02 331.67 950.89 Pass
12054.62 7847.21 12475.00 7922.14 44.31 54.85 273.68 265.53 8.500 1256.50 332.17 964.90 Pass
12075.00 7860.35 12500.00 7936.12 44.34 54.98 273.68 265.53 8.500 1270.98 332.68 978.91 Pass
12095.38 7873.48 12525.00 7950.10 44.38 55.11 273.68 265.53 8.500 1285.46 333.18 992.92 Pass
12115.76 7886.62 12550.00 7964.08 44.41 55.24 273.68 265.53 8.500 1299.94 333.69 1006.93 Pass
12136.14 7899.76 12575.00 7978.06 44.44 55.37 273.68 265.53 8.500 1314.42 334.19 1020.93 Pass
12156.52 7912.89 12600.00 7992.04 44.48 55.50 273.68 265.53 8.500 1328.89 334.70 1034.94 Pass
12176.91 7926.03 12625.00 8006.02 44.51 55.63 273.68 265.53 8.500 1343.37 335.21 1048.94 Pass
12197.29 7939.16 12650.00 8020.00 44.54 55.77 273.68 265.53 8.500 1357.85 335.71 1062.95 Pass
12217.67 7952.30 12675.00 8033.98 44.58 55.90 273.69 265.54 8.500 1372.33 336.22 1076.95 Pass
12238.05 7965.43 12700.00 8047.96 44.61 56.03 273.69 265.54 8.500 1386.81 336.73 1090.96 Pass
12258.43 7978.57 12725.00 8061.94 44.64 56.16 273.69 265.54 8.500 1401.29 337.24 1104.96 Pass
12278.81 7991.71 12750.00 8075.92 44.68 56.29 273.69 265.54 8.500 1415.77 337.75 1118.96 Pass
12299.19 8004.84 12775.00 8089.90 44.71 56.42 273.69 265.54 8.500 1430.24 338.26 1132.97 Pass
12319.57 8017.98 12800.00 8103.88 44.75 56.55 273.69 265.54 8.500 1444.72 338.77 1146.97 Pass
Drill: x
Re-Entry:
2. Name of Operator
BP Exploration (Alaska), Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
4889' NSL, 501' WEL, SEC 06, T11N, R14E, UM
At top of productive interval
1471' FSL, 84' FWL, SEC 30, T12N, R14E
At total depth
1585' FSL, 98' FWL, SEC 30, T12N, R14E
12. Distance to nearest 13. Distance to nearest well
property line
ADL0282991389' feet E-10A is 35' away @ 601' mdfeet
16. To be completed for deviated wells
Kickoff depth!OCJOO feet
18. Casing prográm
size
Casing
ZOil
c.t 'J1ð 1\
'7 "
1 a. Type of work
Hole
&>"
/'Z.{¡4il
~ 3/4-'1
STATE OF ALASKA
J D GAS CONSERVATION cd,
PERMIT TO DRILL
20 AAC 25.005
,~'
ALASKA OIL I
Redrill: x
Deepen:
1 b. Type of well
Service: x
Maximum hole angle: 560
Weight
Cf.5r1
¿"(-o t.1-
2(pf
Specifications
Grade Coupling
ft-«J ttf/e/cI
I- -ð'O i3TC -;11
L-8-0 ~-W1
Top
Length MD TVD
~ ' .$t.Æy:fqe¿ <'ur (..¿
5Jl Z ¡ :;, I~,ce... ~'IlT ee..
tZSZ7 ~lUymce.. ç;.,(yktœ
Quantity of cement
(include stage data)
ZfcO ç~
ltn sx
144- SX C/C¡S"S r 67 '
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet
true vertical feet
true vertical
20. Attachments: Filing fee: X Property Plat: BOP Sketch:
Drilling fluid program: Time vs. depth plot: Refraction analysis:
21. I herby certify that the foregoing is true and correct to the best of my knowledge:
Signed Á /.1£ L-' CJ-- Title: f)/kA a~ /1 LL~ ¡;-. "."'lI.~
/ {/ Commission Use Only (j a
API5nOu_mb,Oer7 Cl - "7~r, 4Q - AA Approval date See cover letter
c.- I (..;-;:TW f tf~ for other requirements
Conditions of approval Samples required: [] Yes [] No Mud log required: [] Yes [] No
Hydrogen sulfide measures [] Yes [] No Directional survey required [] Yes [] No
Required working pressure for BOPE [] 2M; [] 3M; [] 5M; [] 10M; [] 15M
Other:
Effective depth:
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
Permit Number
Approved by
measured
true vertical
feet
feet
Length
Size
/3Si
51) ( Z-
i(, LI
Zc (11; '5;pr,
r fi' 'IV #,
measured
Form 10-401 Rev. 12-1-85
~L6f\"
(t /1 !'Ï.) l
¡MISSION
Exploratory:
Developement Gas:
5. Datum Elevation (DF or KB)
Plan RKBE=64.3' feet
6. Property Designation
~ z.&~o4-
7. U nit or property Name
Prudhoe Bay Unit
8. Well number
.
E-104A I
9. Approximat~ spuF date
I~I /O/ D¡
14. Number of acres in property
Stratigraphic Test: Development Oil:
Single Zone: x Multiple Zone:
10. Field and Pool
Prudhoe Bay Field / Midnight Sun
11. Type Bond (see 20 AAC 25.025)
Number
2S 1 00302630-277
Amount
15. Proposed depth (MO and NO)
z. ScQ 0 12,527' md 18,152' tvd
17. Anticipated pressure (see 20 AAC 25.035 (e)(2»
Maximum surface Z Co.() 3 psig At total depth (NO) 7964 / 3400
Setting Depth
feet
psig
Bottom
MD TVD
l.s~ 133
5<J I 'Z- :. ?7 (0 1"
lZ'SZ7 fl¡'5'Z-
Plugs (measured)
r'j\ ìi, (' JI"" ~, V E"" [: '\
""J! rr ~.., ,~
~ '\ kL. \..", IL. ¡ ,,~ ",i
I' '""" n '" ".)0.101"1.1
" ~'" " _.I'! C, U ~
Junk (measured)
Cemented
:J~kmk¡l Oil ,R Gas CÜT:S.. CommI:;;s!on
Jtnehora.:ge
Measured depth True vertical depth
z. f$:J s t:-
'573 b flrhc gel-
(p'1 b.. (& I '7ëiì I
13;;
50 I 7-"
133
i57~1.,-
Diverter Sketch:
Seabed report:
Drilling program: X
20 AAC 25.050 requirements:
Date: /~!O 7 )/
Commissioner
by order of
the Commission
Date:
ORIGINAL,"
Submit in triplicate
l
(
(
E-104i
(Contingency
Sidetrack)
Drill and Complete Plan Summary
Well Name:
L!lPe of Well (service I producer I injector)-=--I Water Injector
Suñace Location: X = 664,449.52 Y = 5,976,672.84
Esti mated 4889' FSL , 501 FEL Sec. 6, T11 N, R14E Umiat
Target Location: X = 660,000.00 Y = 5,983,690.00 TVOss 7991
Kuparuk "C" sands FSL, FEL Sec. 25, T12N, R13E Umiat
Bottom Hole Location: X = 660,014.00 Y = 5,983,804.00 TVOss 8087
FSL, FEL Sec. 25, T12N, R13E Um
I AFE Number: 15M0512
1 Estimated Start Date: 112/09/2001 1
~on 14
l.Qperatin~s to complete: 15.3
1 MD: 112,527' 1
1 TVD: 18152.' 1
1 BF/MS: 129.8' I
1 RKB: 164.3'
I Well Desi~(conventional, slimhole, etc.)..J 9 5/8" X 7" USH-LS (4 %" tubing)
~ective: 1
Kuparuk Formation (C - Sand)
Mud Program:
12 1/4" Suñace Hole 0-5012' :
Initial
below -2000' MO
interval TO
8.5 - 8.6
9.0 - 9.5
9.6 max
9 5/8" casin in lace
APIFL
mls/30min
15 - 20
<10
<10
fJj
8.5-9.5
8.5- 9.5
8.5-9.5
8 3/4" Intermediate I Production Hole (10000' - 12527'): Fresh Water LSND
Interval Density Viscosity PV YP pH API HTHP
(ppg) (seconds) Filtrate Filtrate
KOP to < 1 0 by
HRZ 10.9 40 - 60 12 - 18 20 - 25 8.5-9.5 3-5 HRZ
HRZ to TO 10.9 40 - 60 12 - 18 20 - 25 8.5-9.5 3-5 <10
E-104i
Page 1
Directional:
Ver. S er -Sun WP-O2
KOP: 300'
Maximum Hole Angle:
Close Approach Wells:
Lo in
Su rface
9 5/8" surface casing in
place @ 5,012' md.
Intermed iate/Prod uction
Hole
I~l
(
56.00° from 2825' MO - 12887' MO TO
All wells pass major risk criteria. However E-1 OA is close in
the surface hole section. E-10A is 34.95' ctr-ctr @ 601'. A
surface ro will be re uired to a roximatel 1000'.
Drilling: MWD / GR
Open Hole: Gyro (SSDS Photo) (-1000' MD)
Contingency.
Cased Hole: None
Drilling: MWD/GRlP4Res/PWD/(Recorded
Neu/Den.)
Open Hole: None
Cased Hole: USIT
Formation TVDss TVDrkb Estimated pore pressure, PPG
Tops
Base Gubik 483 547.3
Base Permafrost 1825 1889.3
SV6 1875 1939.3
Mid-Eocene Unconf. 2755 2819.3
SV5 2885 2949.3
SV4 3125 3189.3
SV3 3615 3679.3
SV2 3795 3859.3
SV1 4170 4234.3
Top UGNU (UG4A) 4680 4744.3
UG3 4915 4979.3
UG1 5410 5474.3 2105 8.7ppg
WS21 Schrader N 6010 6074.3 2180 8.6
WS11 Schrader 0 6240 6304.3 2215 8.5
Top Colville (CM3) 6415 6479.3 2280 8.2 (Continaency SIT KOP at 6474' ss)
CM2 7600 7664.3
CM1/THRZ 7820 7884.3
BHRZI Top Kalubik 7926 7990.3
Kuparuk Upper 7931 7995.3 3400 8.0
Kuparuk Lower 7964 8028.3 3400 8.0
BKUP/TMLV 7991 8055.3
OGOC 8010 8074.3
TD 8075 8139.3
TD Criteria 150' below Miluveach top
E-1 04i
Page 2
('
f
C
8
IT b8
p
aslnt~ u Ing rog ram:
Hole Casingl Wt/Ft Grade Conn Length Top Btm
Size Tbg O.D. MD/TVD MD/TVD bkb
30" 20" 91.5# H-40 WLD 80' GL 133'/133'
12~" 9 5/8" 40.0# L-80 BTCM 5012' GL 5012'/3762'
83/4" 7" 26.0# L-80 BTCM 12527' GL 12527'/8152'
Tubing 4 %" 12.6# L-80 NSCT 12530' GL 12530'/7935'
Cement Calculations:
The following surface cement calculations are based upon a single stage job using a port collar as
contingency if cement is not circulated to surface.
Casing Size 19 5/8" Suñace in place I
Bas is: N/A
N/A
Total Cement Volume: Lead N/A
Tail N/A
Casin
Basis:
Tail: Based on TOe 500' MD above top of Kuparuk target and 30% excess + 80' shoe
volume
Tail TOe: 11785' MD, 7675' TVDbkb
Total Cement Volume:
Tail
30 bbls / 168 ft / 144 sks of Dowell Premium 'G' at 15.8
and 1.17 cf/sk.
E-104i
Page 3
~
f
Well Control:
Surface hole will be drilled with diverter. The intermediate hole, well control equipment consisting
of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be
installed and is capable of handling maximum potential surface pressures. Based upon
calculations below BOP equipment will be tested to 4000 psi
Diverter, BOPE and drilling fluid system schematics on file with the AOGCC.
Production Interval-
. Maximum anticipated BHP:
. Maximum surface pressure:
3400 psi @ 7964' TVDss - Kuparuk UB
2603 psi @ surface
(based on BHP and a full column of gas from TO @ 0.10 psilft)
. Planned BOP test pressure:
. Planned completion fluid:
4000 psi
8.6 ppg filtered seawater / 6.8 ppg Diesel
Disposal:
. No annular injection in this well.
. Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind
and inject at DS-04.
. Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-
04 for injection. Haul all Class I wastes to Pad 3 for disposal.
E -1 04 i
Page 4
('
(
SIDETRACK
SUMMARY
AND
COM P LETE
PROCEDURE
Pre-Sidetrack Work:
1. Circulate 2 complete hole volumes in preparation for setting a cement abandonment and
kickoff plugs.
2. Determine from log data, interval/intervals which must be isolated with cement per State
Regulation 20 AAC 25.112. Cement must be placed from total depth to 100 feet above the
top of the uppermost significant hydrocarbon-bearing zone.
3. R/U and run in hole to TD with 5" drill pipe and -500' of 3 %" open-ended stinger.
4. Set a balanced 15.8# cement plug to a depth sufficient to cover all significant hydrocarbon
bearing zones, based upon log data.
5. POOH to approximately 1 00' above the cement top. Circulate clean, displacing as much
lighter weight mud as possible, leaving a heavier weighted mud spacer above the P&A plug.
6. Pump the heavy weight mud spacer from top of cement to - 10,300' md.
7. Pump a -500' balanced plug of 17.0# kickoff plug cement, with top at 9,800', minimally.
8. POOH to - 300' above cement top and circulate clean.
9. POOH. Wait on cement minimally 12 hours.
Rig Operations:
1. RIH with 8 %" LWD/MWD assembly.
2. Wash down to cement top and dress off to -10,000' md.
3. Sidetrack at a toolface of - 100° right of highside.
4. Drill ahead to a depth of -150' md below base Kuparuk, -12,527' md. Condition hole for casing
run, as needed. Minimally, circulate two full hole volumes. POOH laying down all 5" drill pipe.
5. Run and cement the 7" production casing as required to cover all significant hydrocarbon-
bearing intervals. Displace the casing with seawater during cementing operations and freeze
protect the 7" x 9 5/8" annulus as required.
6. R/U Schlumberger e-line and make a Gauge ring / Junk basket run to TD.
7. Test the 7" casing to 4000 psi for 30 min.
8. Run a USIT log, as required for an Injector well.
9. Run the 4 1/2", L-80, NSCT connections, completion assembly. Test the production
casing/tubing annulus to 4000 psi and the tubing to 4000 psi.
10. Nipple down the BOPE. Nipple up and test the tree to 5000 psi.
11. Freeze protect the well to -3000' TVD (3700' MD) and secure; set BPV and test to 500 psi.
12. Rig down and move off.
Estimated Sidetrack Date:
12/10/2001
E-104i
Page 5
(
~
E-1 04i
Setting the e.!!!9 I abandonment and kickoff cement ~
Operational Specifics
. Initially, a 15.8# class 'G' cement plug will be required to isolate any Kuparuk formation that is
present. By State AOGCC regulation, minimally 100' of cement above the uppermost significant
hydrocarbon-bearing zone is required. The depth for top oc cement will be determined via
MWO/LWO log data, once TO has been reached.
. A heavy weight mud spacer will be spotted on top of the P&A cement plug, to a depth of
approximately 10,300' md.
. A 17# kickoff plug will be spotted on top of the heavy weight mud spacer. The Kickoff plug will
be minimally 500' of open hole footage. This will allow for contamination and dress-off prior to
kickoff at -10,000' md.
Job 7: Drillina Intermediate I Production Hole
Hazards and Contingencies
> No fault crossings are expected in the Intermediate I Production interval of E-1 04.
> KICK TOLERANCE: In the worst case scenario of 8.0 ppg pore pressure at the Kuparuk target
depth, a fracture gradient of 12.5 ppg at the surface casing shoe, and 10.3 ppg mud in the hole,
the kick tolerance is 131.7 bbls.
> The mud weight will 1 0.9 ppg to drill the HRZ and maintained to TO. Due to an expected
Kuparuk pressure of.... 3400 psi (8.0 ppg), attention to possible lost circulation and differential
sticking is essential.
Reference RPs
Operational Specifics
.
......--.,---..-.........-..-"'..--"".."....,--,......--,..........-. "",-.."",-".""""-.,-,,,-',....-,....-....--..ø_'
Job 8: Loa Production Hole
Hazards and Contingencies
> No production hole logging program is planned for this well.
).
_.._,.._........"--..,-",......._....-""...,_...._"..~"".,.""--_._---"",,,,--,,,-..--...--..-......-."-,-....-""'-.-----
E-1 04i
Page 6
(
('
Job 9: Case & Cement Production Hole
Hazards and Contingencies
» It is expected that the Ugnu and Schrader will be wet. For this reason, the plan is to cement the
7" casing to, minimally, 500' md above the Kuparuk reservoir (the uppermost significant
hydrocarbon). The top of the hydrocarbon interval should be verified with LWD resistivity log.
The "Top of Cement" depth should be confirmed.
» The well will be underbalanced after displacing the cement with Sea Water. Verify that the
Floats are holding before continuing operations and hold pressure on the well if they are not
holding.
» E-104 is planned as a water injection well. As such, a cement bond log will be required. A USIT
log will be run from the 7" float collar to above the calculated top of cement to verify adequate
cement bond.
Reference RPs
.:.
Operational Specifics:
.
.._...-......._~.._,......_""~..._,.,....__._--,.,..,-_.~,,,-,~.,--~,.,",--""",-",~",-"""-",-,~"",~,-""",._"""""-"""""",--,,,,..._.~,_.".",._,..
Job 12: Run Completion
Hazards and Contingencies
» No hazards specific to this well have been identified for this phase of the well construction.
Reference RPs
.:.
Operational Specifies:
.,.--....-.."'.""...-.,--.-,-.-.........----.....-....---"....---....,...-'-"_""."."""_""_--'---"'W"-~'-'.""'---""""'-"'-"--'
Job 13: ND/NU/Release Ria
Hazards and Contingencies
» No hazards specific to this well have been identified for this phase of the well construction.
Operational Specifics:
E -1 04 i
Page 7
Alaska
Data for E~ 104
WPO2
Azim.
Eastings
Northings
10000,00
tO030,OO
10590,56
5560.48
7033,9 ¡
324,005
8147
5324,09 N
W
438656
4488,10
6555J)9
6903,73
6800
7600
(ij'::::
Qg
'-e co
(IJ
>{5
,£;
(¡j
~ 8400
(/)
Di, @ 6.000"i10Oft 10000.00ftMD,6638.26ftTVD
10030.00ft MD, 6666.09ft TVD
: 10690.66ftMD,600373ftTVD
4800
5600
6,000
6,000
0,000
0,000
-
õ
0
'<t
II
s:::
(,)
c
- 5400
(¡j
-¡¡¡
(,)
(/)
7000
@ 6.000'i1O0ft 10000.00ltMD,6638.26ftTVD
Depth 12627.16ftMD,8161,98ftTVD
6600
6200
5800
Sail @ 1O690.66ftMD,6903.73ftTVD
@ 6,OOO'iiOOft: 10030.00ft MD,
-4600 -4200
1 inch", 400ft
-3800
Reference True
Current Well Properties
Sper,J,-Sun Drilling Ser~ ices
Proposal Data - E-104 WPS - E-104 Contingency WP02
Draft Copy
I. -------.--".---'-, .,~--,-,' " .-..'-.".. ,'.-"---.-::--,". ,.',-----'---,' "-, --', -,',-:----.,-. --~.' -., ,. '----,----------.,"----, -----:-:--'-,' ---." ---,",---:---.-,,-.'-.--.--------,'-"'.'",.-. .--'
I . MD, Deltalnclin. Azimuth rvp Delta' Northings Eastings Dogleg A. Build. A.Turn 'Toolface VS (2°)
I '(ft) Mq(ft) , (OJ"~ e) ", (ft) TVO (ft) '(ft). , (ft) '.e1100ftl (0110Oftre/tOOft) (O) ,(ft).'
---....., - ,-,--,-"..,.,.--,'.,----.-: --""'---"'--"""'-'-""""'-"'---"""--,""'---,'-,-,-'J'.--...........- .-...-.....-.-..,-.,---....-.......-, "'----.""'"
-1 ~.1O0q~:~01 _._,:_...:..;~-~~,~~i-,'~~~~~L-~~~!...._... .,..__:¡.:~~~:,~-~L ~?2~~_~.:.. . ----- ;.~..._._-,:,';,_.- ...:""--",~,,,--,,-'-~-'...,~1~~:t
. 2 ',10030.00, 30.00! -55.71; ,,'326.15!6555.09: 16.841 5344.44 Nì 4386.56 Wi 6.00 -o.98¡' - '7.15; 100.00, '5148:8
-----..J~---~--.-';"";--------_--:~--....--....J----------"';""¿"':'--'--'--"-~--'-,.-r-~L-- - - - - - - - -.....;- --'------------- ---~- - :--~.;.--
3 10590.56'.' :'560~5ij 4á87 , ::>. :'8~156903:73 348.64:-'5760~9O-N 4488.tOW 6.00 -1.04' 7.49' 112¡54. .5,560;5
I ., ;" '." ,. , .
4T>123,&~16' ~786.6t '~.87','", 8~'1-5 8055.30',115,ÙS7 7113.08N 4294.52W, 0.00 0.00,0,00, 0.00 Ø.1~9.8
- - - --,.------r-----.-r--"--"'7"---'-~--' :--~-~---~- ---'-r----:--"-~---~"-~-~-~"-'.~" - -~-~-
, 5 i 12527;11>; 150.00; .49~87:. 8.15]'8151.98: 96.6ð~ 7226.60.NI4278.21Wi 0.00; 0.00; ,0.00: , , 0.001 7003.9
6 December, 2001 - 7:24
- 1 -
DrillQuest
-.
PROPOSAL REPORT
6 December, 2001
-..,
Surface Coordinates: 5976672.84 H, 664449.52 E (70° 20' 33.2582" H, 148° 39' 55.0257" W)
Surface Coordinates relative fO project H Reference: 976672.84 H, 164449.52 E (Grid)
Surface Coordinates relative fo Structure Reference: 3468.06 H, 1987.11 E (True)
Kelly Bushing: 64.30ff above Mean Sea Level
~V-SLJI!
DRILLING $~ces
A Halliburton Company
proposal Ref: pro11033
North Slope Alaska
Measured
Depth
(ft)
10000.00
10030.00
10100.00
10200.00
10300.00
10400.00
10500.00
10590.56
10600.00
10700.00
10800.00
10900.00
11000.00
11100.00
11200.00
11300.00
11400.00
11500.00
11600.00
11700.00
11770.54
11800.00
11900.00
12000.00
12100.00
12111.87
12200.00
12276.32
12284.07
12300.00
Incl.
56.000
55.706
54.188
52.365
50.991
50.107
49.741
49.868
49.868
49.868
49.868
49.868
49.868
49 .868
49 .868
49.868
49.868
49 .868
49.868
49.868
49 .868
49.868
49.868
49.868
49.868
49.868
49.868
49.868
49.868
49.868
Azim.
324.005
326.151
330.936
338.070
345.517
353.205
1.034
8.147
8.147
8.147
8.147
8.147
8.147
8.147
8.147
8.147
8.147
8.147
8.147
8.147
8.147
8.147
8.147
8.147
8.147
8.147
8.147
8.147
8.147
8.147
Sub-Sea
Depth
(ft)
6473.95
6490.79
6531.01
6590.85
6652.91
6716.51
6780.94
6839.43
6845.52
6909.9
6974.43
7038.89
7103.34
7167.80
7232.25
7296.71
7361.16
7425.62
7490.08
7554.53
7600.00
7618.99
7683.44
7747.90
7812.35
7820.00
7876.81
7926.00
7931.00
7941.27
Vertical
Depth
(ft)
653825
6555.09
6595.31
6655.15
6717.21
6780.81
6845.24
6903.73
7361.01
7425.46
7489.92
7554.38
7618.83
7664.30
7683.29
7747.74
7812.20
7876.65
7884.30
7941.11
7990.30
7995.30
8005.57
Sperry-Sun Drilling Services
Proposal Report for E-104 WPS - E-104 Contingency WP02
Revised: 6 December. 2001
Local Coordinates
Northings Eastings
(ft) (ft)
5324.09 N
5344.44 N
5393.29 N
5465.53 N
5539.94 N
5919.42 N
5995.10 N
6070.79 N
6146.47 N
6222.15 N
6297.84 N
6373.52 N
6449.21 N
6524.89 N
6600.57 N
6653.96 N
6676.26 N
6751.94 N
6827.63 N
6903.31 N
6912.29 N
6978.99 N
7036.75 N
7042.62 N
7054.68 N
4372.35 W
4386.56 W
4493.64 W
4488.10 W
4487.08 W
4476.24 W
4465.41 W
4454.57 W
4443.74 W
4432.90 W
4422.07 W
4411.23 W
4400.40 W
4389.56 W
4378.73 W
4367.89 W
4360.25 W
4357.06 W
4346.22 W
4335.39 W
4324.55 W
4323.26 W
4313.72 W
4305.45 W
4304.61 W
4302.88 W
Global Coordinates
Northings Eastings
(ft) (ft)
5982188.72 N
5982264.93 N
5982333.90 N
5982341.07 N
5982416.98 N
5982492.88 N
5982568.78 N
5982644.69 N
5982720.59 N
5982796.49 N
5982872.40 N
5982948.30 N
598302420 N
5983100.11 N
5983176.01 N
5983229.55 N
5983251.91 N
5983327.82 N
5983403.72 N
5983479.63 N
5983488.63 N
5983555.53 N
5983613.46 N
5983619.34 N
5983631.43 N
" 659961.43 E
~6~46.78 E
l'
659915.80 E
659879.71 E
659853.56 E
659837.63 E
659832.10 E
659836.13 E
659836.99 E
659846.16 E
659855.34 E
659864.51 E
659873.68 E
659882.85 E
659892.03 E
659901.20 E
659910.37 E
659919.54 E
659928.72 E
659937.89 E
659944.36 E
659947.06 E
659956.23 E
659965.41 E
659974.58 E
659975.67 E
659983.75 E
659990.75 E
659991.46 E
659992.92 E
Dogleg
Rate
(°/1 0 Oft)
6.000
6.000
6.000
6.000
6.000
6.000
6.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Vertical
Section
5129.10
5148.82
5196.32
5266.99
5340.27
5415.36
5491.44
5560.48
5567.66
5643.75
5719.83
5795.91
5872.00
5948.08
6024.16
6100.25
6176.33
6252.41
6328.50
6404.58
6458.25
6480.66
6556.75
6632.83
6708.91
6717.94
6785.00
6843.06
6848.96
6861.08
.
Alaska Drilling & Wells
PBU_WOAE Pad
Comment
Tie-on: Start Dir @ 6.0000/100ft :
1 OOOO.OOftMD ,6538.25ftTVD
Change Dir @ 6.0000/1DOft :
1 0030.00ft M D, 6555.09ft ìVD
--
End Dir, Start Sail @ 49.868° :
1 0590.56ftMD ,6903.73ftTVD
-~~
CM2
CM 1 fTH RZ
Base HRZlTop Kalubik (pebbly shale)
Top Kuparuk/Top Kup. Upper Unit
6 Decembers2001-8:38
Page 2 of 5
DrillQuest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for E-104 WPS - E-104 Contingency WPO2
Revised: 6 December~ 2001
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings
(ft) (ft) (ft) (ft) (ft)
1233527 49.868 8.147 7964.00 8028.30 7081.37 N 4299.06 W
12377.16 49.868 8.147 7991.00 8055.30 7113.08 N 4294.52 W
12400.00 49.868 8.147 8005.72 8070.02 7130.36 N
12406.64 49.868 8.147 8010.00 8074.30 7135.39 N
12500.00 49.868 8.147 8070.18 8134.48 7206.05 N
12527.16 49.868 8.147 8087.68 8151.98
Global Coordinates
Northings Eastings
(ft) (ft)
"-"-.'"
All data is in Feet (US) unless otherwise stated. Directio
Vertical depths are relative to Well. Northings and ,.
Magnetic Declination at Surface is 26.532° (06-Dec-
The Dogleg Severity is in Degrees per 100 feet (US). .
Vertical Section is from Well and calculated along an Azimuth of 2.490° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 12527.16ft.,
The Bottom Hole Displacement is 8398.06ft, in the Direction of 329.374° (True).
Dogleg
Rate
(°/1000)
0.000
0.000
Vertical
Section
6887.91
6919.79
660002.09 E 0.000 6937.16
660002.70 E 0.000 6942.21
660011.27 E 0.000 7013.25
660013.76 E 0.000 7033.91
5983803.85 N
.
Alaska Drilling & Wells
PBU_WOAE Pad
Comment
Kuparuk Lower Unit
BKU PfTM LV
Target - E-104A T1 Contingency,
Drillers
,----~,
Original GOC
Total Depth: 12527.16ft MD, 8151.98'
TVD
7" Casing
'-"',
6 December~ 2001 - 8:38
Dril/Quest 2.00.09.006
Page 3 of5
Sperry-Sun Drilling Services
Proposal Report for E-1O4 WPS - E-1O4 Contingency WP02
Revised: 6 December, 2001
North Slope Alaska
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
10000.00
10030.00
10590.56
12527.16
6538.25
6555.09
6903.73
8151.98
4372.35 W
4386.56 W
4488.10 W
4278.27 W
Tie-on: Start D
Change Dir I
End Dir, Start
,th : 1
5324.09 N
5344.44 N
5760.90 N
7226.60 N
Formation Tops
Formati on Plane t ion Poi n t
(Below Well Origin)
Sub-Sea Dip Dip Dir. Northings Eastings Formation Name
(ft) Deg. Deg. (ft) (ft)
6415.00 0.000 1.257 5253.38 N 4320.99 W CM3 (top Colville, base West Sak)
7600.00 0.000 1.257 6653.96 N 4360.25 W CM2
7820.00 0.000 1257 6912.29 N 4323.26 W CM1ITHRZ
7926.00 0.000 1.257 7036.75 N 4305.45 W Base HRZlTop Kalubik (pebbly shale)
7931.00 0.000 1.257 7042.62 N 4304.61 W Top KuparukITop Kup. Upper Unit
7964.00 0.000 1.257 12335.27 8028.30 7964.00 7081.37 N 4299.06 W Kuparuk Lower Unit
7991 .00 0.000 1.257 12377.16 8055.30 7991.00 7113.08 N 4294.52 W BKUPfTMLV
8010.00 0.000 1.257 12406.64 8074.30 8010.00 7135.39 N 4291.33 W Original GOC
6 December. 2001 - 8:38
Page 4 of 5
.
Alaska Drilling & Wells
PBU_WOAE Pad
-..
.--.
Dril/Quest 2.00.09.006
North Slope Alaska
Casing details
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
<Surface>
10000.00
<Surface>
6538.25
Targets associated with this wellpath
Target
Name
E-104A T1 Contingency
Sperry-Sun Drilling Services
Proposal Report for E-104 WPS - E-104 Contingency WPO2
Revised: 6 December. 2001
To
Measured Vertical
Depth Depth
(ft) (ft)
5101.96
12527.16
Casing Detail
3799.30
8151.98
9 5/8" Casing
7" Casing
Target
Shape
Point
.
Alaska Drilling & Wells
PBU_WOAE Pad
-.
Target
Type
Drillers
-~
6 December~ 2001 - 8:38
Dril/Quest 2.00.09.006
Target Entry Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
ean Sea LeveVGlobal Coordinates:
Geographical Coordinates:
8055.30
7991.00
7113.08 N 4294.52 W
5983690.00 N 660000.00 E
70° 21' 43.2073" N 148° 42' 00.6116" W
Page 5 of 5
(
8 perry -8 un
Anticollision Report
(
íë~mpany: - 'BP ~o - -- -- - D~e: 12/06/2001 - 'Time: 08:13:16 ' -Page: - - t-.-.-;
l FJeld: Prudhoe Bay :
Reference Site: PB E Pad Co-ordinate(NE) Reference: Well: E-1O4, True North :
ReferenceWeU:, E-,104 '-- - " ., Vertical (TVD) Reference,: '22: 124, /19/198200:0064.3 , ' -- :
_o~e~~~~_~~~~th:___~Ian.:.....E-1 04A- Con!lnge~y ------_.. - D~: Oracle______.J
r GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of referenc~ - There are ~lIIIdls in this f12tð1cipal PI~ & PLANNED PROGRAM-.-¡
Interpolation Method: MD Interval: 25.00 ft Error Model: ISCWSA Ellipse :
Depth Range: 10000.00 to 12527.16 ft Scan Method: Trav Cylinder North !
Maximum Radius: 1446.29 ft Error Suñace: Ellipse + Casing
L______------------ ..----- --------------------------------.---------- ---- --- ----,.-.-------- -- ------- --
- -- - --- -- ---- -------- --- - ------- -- ---- --- - --- - ---,. -- ---- - -- - ---- -
-------,-----------
Survey Program for Definitive Wellpath
Date: 11/27/2001 Validated: No
Planned From To Survey
ft ft
----. - -------------------- -----
64.30 1002.30 Planned: E-104A Contingenncy w
1002.30 10000.00 Planned: E-104A Contingenncy w
10000.00 12527.16 Planned: E-104AContingenncyw
Version:
Toolcode
2
Tool Name
------------------------------ .-------------------------- --,----
CB-GYRO-SS
MW D+I FR+MS
MWD+IFR+MS
Camera based gyro single shots
MWD + IFR + Multi Station
MWD + IFR + Multi Station
- - ------ --- ----------------------------------------- -.------------ --------_.-- --0 --_-__0'_- --- ------..----------------..--------------.- ----- ------- ,-- --..-- - -
Casing Points
]¡~~~!i:i~~~~:::::==~=-~~
Summary
Ft{~lf1ill.liJD~lliliJJ llir~dHI_~;:§~_~~I[1EtillC1
PB E Pad E-08 E-08 V1 Out of range
PB E Pad E-09A E-09A V1 Out of range
PB E Pad E-09APB1 E-09APB1 V1 Out of range
PB E Pad E-09 E-09 V1 Out of range
PB E Pad E-100 E-100 V3 Out of range
PB E Pad E-102 E-102 V14 Out of range
PB E Pad E-102 Sidetrack VO Plan: E-1 Out of range
PB E Pad E-103 E-103 V7 Plan: E-103 w 10962.95 12240.62 1253.72 283.27 1060.89 Pass: Major Risk --
PB E Pad E-104 Plan E-104 V8 Plan: E- 10024.99 10025.00 0.33 332.17 -325.18 FAIL: Major Risk ..../
PB E Pad E-10A E-10A V3 Out of range
PB E Pad E-10 E-10 V1 Out of range
PBEPad E-110 E-110V3Plan:Definit Out of range
PB E Pad E-111 E-111 V2 Plan: Def/nit Out of range
PB E Pad E-11APB1 E-11APB1 V3 Out of range
PB E Pad E-11 E-11 V4 Out ofrange
PB E Pad E-11 E-11A V4 Out of range
PBEPad E-11 Plan E-11BV17 Plan: E Outofrange
PB E Pad E-12 E-12 V1 Out ofrange
PB E Pad E-31 E-31 V2 Out of range
PB E Pad E-31 Plan E-31 A V25 Plan: E Out of range
PB E Pad E-34 E-34 V1 Out of range
-------'.-.--'.--"-..--------------.-------._-._0-._---..-.....----...--------.-------...--.---.--.-.---.--.------------------------------,.---.--..--.--..------..--------------.---. -.------..--------.-------------------------------..-------------.----. ----------------.-- ---.------ . -____--_0___-__-'-----.-----------,--,---,-------.----...------_.'_'0__.._.-..---'-----'---------------'---------. --.------....-.
Site: PB E Pad
Well: E-103 Rule Assigned: Major Risk
Well path: E-103 V7 Plan: E-103 wp05 V1 Inter-Site Error: 0.00 ft
~ J ~. if_..r ~ y ~ ~ I; it.- ~. Ji ~ i W] ~ J
10795.21 7035.49 11900.00 8127.64 42.59 38.44 179.70 171.55 4.500 1444.09 277.30 1282.72 Pass
10807.74 7043.57 11925.00 8126.16 42.61 38.57 180.33 172.18 4.500 1429.22 277.72 1265.81 Pass
10820.21 7051.60 11950.00 8124.59 42.62 38.69 180.97 172.82 4.500 1414.46 278.13 1248.97 Pass
10832.64 7059.61 11975.00 8122.96 42.64 38.81 181.62 173.47 4.500 1399.83 278.54 1232.21 Pass
10845.03 7067.60 12000.00 8121.27 42.65 38.93 182.29 174.14 4.500 1385.34 278.95 1215.55 Pass
10857.38 7075.56 12025.00 8119.53 42.66 39.05 182.96 174.81 4.500 1371.01 279.35 1199.00 Pass
10869.76 7083.54 12050.00 8117.69 42.68 39.17 183.65 175.50 4.500 1356.74 279.76 1182.48 Pass
10882.17 7091.54 12075.00 8115.74 42.69 39.29 184.35 176.20 4.500 1342.50 280.16 1165.97 Pass
10894.54 7099.51 12100.00 8113.71 42.71 39.41 185.06 176.91 4.500 1328.41 280.57 1149.55 Pass
10906.82 7107.42 12125.00 8111.63 42.72 39.53 185.78 177.63 4.500 1314.52 280.97 1133.29 Pass
10919.02 7115.29 12150.00 8109.54 42.74 39.66 186.53 178.38 4.500 1300.90 281.38 1117.23 Pass
--..-- -------__-".-0._..___-. "-"""'---"-""'---""__'0_....___-------....-- ---....-------..-...--..---------....---------.-..--. .-"-------""'."-------'---""-.-----'_.___"0______--...-,-..--..-----_....-.._---..._--- - .-.....,.,---..---------..-.- -..-----,.---.....-..-----....--- ---------".--"--_-.'--0_.__.._------ -..---------- --.......-.----..,,--. -.-..
(
8 perry -8 un
Anticollision Report
(
ic;~pan ;--- ---c---BP A~;---c--------- --------, Da;~; '1&;O6/20Õ1- -------Tim~'--Õ8; 3;16-----P;;~~--~ ,,--, --" ]
I Field: Prudh~Bay .
I Reference Site: PB E Pad Co-ordinate(NE) Reference: Well: E-1 04, True North
I Reference Well: E-l04 Vertical (TVD) Reference: 22 :124/19/198200:00 64.3
l~!!~~~~e We..Upath~_~lan: _E-l 04A ~ontingen9_~___,-------------- ----------,,----------- Db:"__C?.~~le__,_".---
Site: PB E Pad
WeD: E-103 Rule Assigned: Major Risk
Wellpath: E-103 V7 Plan: E-l03 wp05 V1 Inter-Site Error: 0.00 ft
Reference Offset '-""'-- Se~i-MajÒ~Axi;-c----""--~c----'-----"'--- Ct~Ch--""N~-:G~--AJï~~1~-c---'-'-"-"'---'------"---1
MD - TVD MD TVD Ref Offset' TFO+AZI TFO-HS Casing DistanceArea Deviation Warning !
ft ft - oft oft ft it deg -~eg ------~--~---~---,-~-_._--~_!~-,----,~-----"-~-----------"- i
10931.15 7123.11 12175.00 8107.45 42.75 39.75 187.30 179.15 4.500 1287.56 281.42 1101.41 Pass
10943.26 7130.92 12200.00 8105.35 42.77 39.81 188.08 179.93 4.500 1274.47 280.71 1085.80 Pass
10955.38 7138.72 12225.00 8103.26 42.78 39.86 188.88 180.73 4.500 1261.62 282.17 1070.40 Pass
10962.95 7143.60 12240.62 8101.95 42.79 39.89 189.39 181.24 4.500 1253.72 283.27 1060.89 Pass
'---'-"---'-'-- -------------------'----------'-------'---'----------- --,-,- ,----,-_....---------- ----------,--------,- -,------,------,----,----------,,------, -----"-,---------,, ,--- ------ "----' -0
Site: PB E Pad
Well: E-104 Rule Assigned: Major Risk
Wellpath: Plan E-104 V8 Plan: E-104 wp02 V1 Inter-Site I~rror: 0.00 ft
1 J i: 1!¥ ~ ~ 1 ill ~; ~ m i ~ - f~!:i1 ~ ~ 1F 1 á ~ § = i}]
10000.00 6538.14 10000.00 6538.14 49.78 50.02 144.00 0.00 8.500 0.00 332.37 -117.02 FAIL
10024.99 6552.16 10025.00 6552.12 49.74 50.11244.64 278.85 8.500 0.33 332.17 -325.18 FAIL
10049.95 6566.29 10050.00 6566.10 49.68 50.17 247.59 280.09 8.500 1.30 332.22 -321.52 FAIL
10074.85 6580.57 10075.00 6580.08 49.58 50.20 251.08 281.89 8.500 2.92 332.39 -315.71 FAIL
10099.64 6594.98 10100.00 6594.06 49.49 50.21 253.61 282.70 8.500 5.19 332.39 -310.20 FAIL
10124.30 6609.49 10125.00 6608.04 49.34 50.20 255.54 282.90 8.500 8.09 332.07 -304.56 FAIL
10148.80 6624.07 10150.00 6622.02 49.19 50.15 257.1 0 282.73 8.500 11.64 331.56 -298.75 FAIL
10173.10 6638.69 10175.00 6636.00 49.00 50.09 258.44 282.33 8.500 15.81 330.73 -292.39 FAIL
10197.18 6653.31 10200.00 6649.98 48.80 49.99 259.62 281.76 8.500 20.61 329.70 -285.60 FAIL
10221.00 6667.90 10225.00 6663.96 48.57 49.88 260.69 281.08 8.500 26.02 328.36 -278.14 FAIL
10244.56 6682.44 10250.00 6677.94 48.33 49.75 261.68 280.33 8.500 32.03 326.81 -270.13 FAIL
10267.81 6696.91 10275.00 6691.92 48.06 49.59 262.60 279.51 8.500 38.64 325.90 -261.44 FAIL
10290.74 6711.26 10300.00 6705.90 47.78 49.42 263.46 278.65 8.500 45.83 324.89 -252.16 FAIL
10313.33 6725.49 10325.00 6719.88 47.48 49.23 264.29 277 . 76 8.500 53.58 323.64 -242.23 FAIL
10335.57 6739.56 10350.00 6733.86 47.16 49.02 265.07 276.84 8.500 61.90 322.15 -231.69 FAIL
10357.43 6753.46 10375.00 6747.84 46.84 48.80 265.82 275.92 8.500 70.75 320.45 -220.57 FAIL
10378.91 6767.17 10400.00 6761.82 46.50 48.56 266.55 274.98 8.500 80.13 318.51 -208.82 FAIL
10400.00 6780.67 10425.00 6775.80 46.16 48.31 267.24 274.04 8.500 90.03 316.42 -196.57 FAIL
10420.66 6793.94 10450.00 6789.78 45.80 48.06 267.92 273.10 8.500 100.42 314.40 -183.69 FAIL
10440.93 6806.98 10475.00 6803.76 45.44 47.79 268.57 272.17 8.500 111.30 312.95 -170.33 FAIL
10460.77 6819.77 10500.00 6817.74 45.07 47.52 269.20 271.25 8.500 122.66 311.30 -156.44 FAIL
10480.19 6832.31 10525.00 6831.72 44.70 47.24 269.81 270.33 8.500 134.46 309.48 -142.05 FAIL
10500.00 6845.10 10550.00 6845.70 44.31 46.93 270.42 269.39 8.500 146.71 307.42 -127.13 FAIL
10517.77 6856.59 10575.00 6859.68 43.94 46.66 270.97 268.54 8.500 159.38 305.38 -111.92 FAIL
10535.92 6868.32 10600.00 6873.65 43.56 46.37 271.53 267.67 8.500 172.47 303.12 -96.20 FAIL
10553.64 6879.77 10625.00 6887.63 43.19 46.08 272.07 266.82 8.500 185.95 300.77 -80.10 FAIL
10570.94 6890.94 10650.00 6901.61 42.80 45.78 272.60 265.99 8.500 199.82 298.92 -63.55 FAIL
10590.56 6903.59 10675.00 6915.59 42.37 45.42 273.19 265.04 8.500 214.08 296.90 -46.18 FAIL
10607.60 6914.57 10700.00 6929.57 42.38 45.55 273.22 265.07 8.500 228.53 297.36 -32.06 FAIL
10627.98 6927.71 10725.00 6943.55 42.41 45.68 273.26 265.11 8.500 243.01 297.84 -17.94 FAIL
10648.36 6940.84 10750.00 6957.53 42.43 45.81 273.29 265.14 8.500 257.49 298.31 -3.83 FAIL
10668.74 6953.98 10775.00 6971.51 42.45 45.94 273.31 265.16 8.500 271.97 298.79 10.28 Pass
10689.12 6967.11 10800.00 6985.49 42.47 46.07 273.34 265.19 8.500 286.44 299.26 24.38 Pass
10709.50 6980.25 10825.00 6999.47 42.50 46.20 273.36 265.21 8.500 300.92 299.74 38.47 Pass
10729.88 6993.38 10850.00 7013.45 42.52 46.33 273.38 265.23 8.500 315.40 300.22 52.56 Pass
10750.26 7006.52 10875.00 7027.43 42.54 46.46 273.39 265.24 8.500 329.88 300.70 66.64 Pass
10770.64 7019.66 10900.00 7041.41 42.56 46.60 273.41 265.26 8.500 344.36 301.18 80.72 Pass
10791.02 7032.79 10925.00 7055.39 42.59 46.73 273.42 265.27 8.500 358.83 301.66 94.80 Pass
10811.40 7045.93 10950.00 7069.37 42.61 46.86 273.44 265.29 8.500 373.31 302.14 108.87 Pass
10831.78 7059.06 10975.00 7083.35 42.63 46.99 273.45 265.30 8.500 387.79 302.62 122.94 Pass
10852.16 7072.20 11000.00 7097.33 42.66 47.12 273.46 265.31 8.500 402.27 303.09 137.01 Pass
-------,..._-,-"",----,-_._,--, ,-- ."---_.,-------,,---,-------.,,... - """,---.---. -- -",-"-------"...",--,,,-----------, ."" .._-----,-----,-"------------",-,,,...._-._----,--- ,----,,-- ---,----"-,, ----, .---- -,.,- -, ------" -----,,--- -------, --."'------..--------, '_,m______--,,--, --" -,--------- - ,,-,... --------. ---" ----",--------______n'.,___----..-,. - _'_n",___----------,"",,----_.. -"" - ,,-- - --, -- ,-, --"..
10954.07
10974.45
10994.83
11015.21
11035.59
11055.97
11076.35
11096.73
11117.11
11137.49
11157.87
11178.25
11198.63
11219.01
11239.40
11259.78
11280.16
11300.54
11320.92
11341.30
11361.68
11382.06
11402.44
11422.82
11443.20
11463.58
11483.96
11504.34
11524.72
11545.10
11565.49
11585.87
11606.25
11626.63
11647.01
11667.39
11687.77
11708.15
11728.53
11748.91
11769.29
11789.67
11810.05
11830.43
11850.81
11871.20
11891.58
7137.88 11125.00
7151.01 11150.00
7164.15 11175.00
7177.29 11200.00
7190.42 11225.00
7203.56 11250.00
7216.69 11275.00
7229.83 11300.00
7242.96 11325.00
7256.10 11350.00
7269.24 11375.00
7282.37 11400.00
7295.51 11425.00
7308.64 11450.00
7321.78 11475.00
7334.92 11500.00
7348.05 11525.00
7361.19 11550.00
7374.32 11575.00
7387.46 11600.00
7400.59 11625.00
7413.73 11650.00
7426.87 11675.00
7440.00 11700.00
7453.14 11725.00
7466.27 11750.00
7479.41 11775.00
7492.55 11800.00
7505.68 11825.00
7518.82 11850.00
7531.95 11875.00
7545.09 11900.00
7558.22 11925.00
7571.36 11950.00
7584.50 11975.00
7597.63 12000.00
7610.77 12025.00
7623.90 12050.00
7637.04 12075.00
7650.18 12100.00
7663.31 12125.00
7676.45 12150.00
7689.58 12175.00
7702.72 12200.00
7715.85 12225.00
7728.99 12250.00
7742.13 12275.00
~'
7167.23 42.78
7181.21 42.80
7195.19 42.83
7209.17 42.85
7223.15 42.88
7237.13 42.90
7251.11 42.93
7265.09 42.95
7279.07 42.98
7293.05 43.00
7307.03 43.03
7321.01 43.06
7334.99 43.08
7348.97 43.11
7362.95 43.13
7376.93 43.16
7390.91 43.19
7404.89 43.21
7418.87 43.24
7432.85 43.27
7446.83 43.30
7460.81 43.32
7474.79 43.35
7488.77 43.38
7502.75 43.41
7516.73 43.43
7530.71 43.46
7544.69 43.49
7558.67 43.52
7572.65 43.55
7586.63 43.58
7600.61 43.61
7614.59 43.64
7628.57 43.66
7642.55 43.69
7656.52 43.72
7670.50 43.75
7684.48 43.78
7698.46 43.81
7712.44 43.84
7726.42 43.87
7740.40 43.90
7754.38 43.93
7768.36 43.96
7782.34 44.00
7796.32 44.03
7810.30 44.06
Sperry-Sun
Anticollision Report
Date: 12/06/2001
47.77 273.51 265.36
47.91 273.52 265.37
48.04 273.53 265.38
48.17 273.53 265.38
48.30 273.54 265.39
48.43 273.55 265.40
48.56 273.55 265.40
48.69 273.56 265.41
48.82 273.56 265.41
48.95 273.57 265.42
49.08 273.57 265.42
49.21 273.58 265.43
49.35 273.58 265.43
49.48 273.59 265.44
49.61 273.59 265.44
49.74 273.59 265.44
49.87 273.60 265.45
50.00 273.60 265.45
50.13 273.61 265.46
50.26 273.61 265.46
50.39 273.61 265.46
50.53 273.61 265.46
50.66 273.62 265.47
50.79 273.62 265.47
50.92 273.62 265.47
51.05 273.63 265.48
51.18 273.63 265.48
51.31 273.63 265.48
51.44 273.63 265.48
51.57 273.64 265.49
51.70 273.64 265.49
51.83 273.64 265.49
51.97 273.64 265.49
52.10 273.64 265.49
52.23 273.65 265.50
52.36 273.65 265.50
52.49 273.65 265.50
52.62 273.65 265.50
52.75 273.65 265.50
52.88 273.66 265.51
53.01 273.66 265.51
53.15 273.66 265.51
53.28 273.66 265.51
53.41 273.66 265.51
53.54 273.66 265.51
53.67 273.67 265.52
53.80 273.67 265.52
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
8.500
('
Time: 08:13:16
Rule Assigned:
Inter-Site Error:
474.66 305.50
489.14 305.99
503.62 306.47
518.10 306.95
532.58 307.44
547.05 307.92
561.53 308.41
576.01 308.89
590.49 309.38
604.97 309.86
619.45 310.35
633.92 310.84
648.40 311.32
662.88 311.81
677.36 312.30
691.84 312.79
706.32 313.28
720.80 313.77
735.27 314.26
749.75 314.75
764.23 315.24
778.71 315.73
793.19 316.22
807.67 316.71
822.14 317.21
836.62 317.70
851.10 318.19
865.58 318.68
880.06 319.18
894.54 319.68
909.02 320.17
923.49 320.66
937.97 321.16
952.45 321.66
966.93 322.15
981.41 322.65
995.89 323.15
1010.37 323.65
1024.84 324.14
1039.32 324.64
1053.80 325.14
1068.28 325.64
1082.76 326.14
1097.24 326.64
1111.72 327.14
1126.19 327.64
1140.67 328.14
Major Risk
0.00 ft
207.32
221.38
235.43
249.49
263.54
277.59
291.64
305.69
319.73
333.78
347.82
361.87
375.91
389.95
403.99
418.03
432.06
446.10
460.14
474.17
488.20
502.24
516.27
530.30
544.33
558.36
572.39
586.42
600.45
614.47
628.50
642.52
656.55
670.57
684.59
698.62
712.64
726.66
740.68
754.70
768.71
782.73
796.75
810.77
824.78
838.80
852.81
. ----,
Page:
3
rl,'compan~: BP Amoco
, Field: Prudhoe Bay
I Reference Site: PB E Pad Co-ordinate(NE) Reference: Well: E-1 04, True North ¡
l.. ;;;.;: ~~;~!b: -- ~~ E -1 O~~-~~~-genc X----. ----- "- .-...- ----_~_~~cal .~~~ -~~~~:::~-- - ---~~- ~~~- ~~-~.~~:~-~~ -~ ~~~~.. ~~~~~:- ..__9!-~!~_..- _._,_J
Site: PB E Pad
WeD: E-1O4
Wellpath: Plan E-1O4 V8 Plan: E-104 wp02 V1
.--------.-------- ---.---.-.-- -------- --- .-------..
Reference . Offset .' Semi-Major Axis . Ctr-Ctr No-Go AUowable
MDTVD MD TVD Ref Offset TFO+AZI TFO-HS Casing DistanceArea Deviation Warning
, ft . ft. ft ft., ft ft deg.' deg in ft. . ft ft
- ----- .------- -_.~---_.._.- --- - --...--'-.- --.--.---. .------------. - --'---.----.. .-..---c_-.- ...-- ---""- -- -- .----....---.---.. ..-.,
10872.54 7085.33 11025.00 7111.31 42.68 47.25 273.47 265.32 8.500 416.75 303.58 151.08 Pass
10892.92 7098.47 11050.00 7125.29 42.71 47.38 273.48 265.33 8.500 431.23 304.06 165.14 Pass
10913.30 7111.61 11075.00 7139.27 42.73 47.51 273.49 265.34 8.500 445.70 304.54 179.21 Pass
10933.69 7124.74 11100.00 7153.25 42.75 47.64 273.50 265.35 8.500 460.18 305.02 193.27 Pass
'--0"'1
J
!
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
-.....-.---.-...-...... -...-.---.......--.-.----..-... -"'----'-'---'--'-"'--""'---"""--"'---".-"""-""-"-- -"-'" .-'" ..-.---..- .....-.. "",'----"'-"""'---""""'--'-."'-"-'.' ..... ..,...,._.._,......_.,.,,--....... .-..,...... ---......... """----"""'-""""----"""""'-"-" ..'. .........-,..-,---,. ..-.- ..,".".._,........_."..,..__...... nO""-"'. .0. ,......
Pass
Pass
(
8 perry -8 un
Anticollision Report
{
[""Company:' BP Amoco
¡Field: Prudhoe Bay
I Reference Site: PB E Pad Co-ordinate(NE) Reference: Well: E-104, True North :
¡Reference WeD:E-1 04 , . Vertical (TVD) Reference: 22: 12 4/19/1982 00:00 64.3 , :
l_~efe~~~ ~eDpath: -. Plan.:....~- ~~~ C~!~~..~n9X____.~---._---_.__.._-_.__.__.__._-_.--._..-..-------,---..-.,--.-.",------.--.--.---.---------..,,--..--....__._-~~-_!?~~~~.._,.._.....!
Site: PB E Pad
WeD: E-1O4 Rule Assigned: Major Risk
Wellpath: Plan E-1O4 V8 Plan: E-104 wp02 V1 Inter-Site Error: 0.00 ft
I~-------Réfu;~~c~-'----~~t --'--'--~~i-M~~r A-;¡;-'-----c-----,----c---' Ctr-Ctr No-Go Allowable '---'------'-1
MD TVD MD . TVD Ref OffsetTFO+AZI TFO-HSCasing Distance Area Deviation Warning !
ftft .ft. tt ftft deg .deg in ft ft ft.. :
----"'- -- --. --------- ---..-- --- ~-- --- - .--------.- - ------ -_.--_. - -.---------.-.- -_.- - -- ----..----.- - ---~-_. - --- -- ._------ -- -.--. - '--'-- _._- --" .,_... I
11911.96 7755.26 12300.00 7824.28 44.09 53.93 273.67 265.52 8.500 1155.15 328.65 866.83 Pass
11932.34 7768.40 12325.00 7838.26 44.12 54.06 273.67 265.52 8.500 1169.63 329.15 880.84 Pass
11952.72 7781.53 12350.00 7852.24 44.15 54.19273.67 265.52 8.500 1184.11329.65 894.85 Pass
----. -----
.._,._--- ,
Date: 12/0612001
Time: 08:13:16
Page:
4
11973.10 7794.67 12375.00 7866.22 44.18 54.32 273.67 265.52 8.500 1198.59 330.16 908.86 Pass
11993.48 7807.81 12400.00 7880.20 44.22 54.45 273.67 265.52 8.500 1213.07 330.66 922.88 Pass
12013.86 7820.94 12425.00 7894.18 44.25 54.59 273.67 265.52 8.500 1227.54 331.16 936.88 Pass
12034.24 7834.08 12450.00 7908.16 44.28 54.72 273.68 265.53 8.500 1242.02 331.67 950.89 Pass
12054.62 7847.21 12475.00 7922.14 44.31 54.85 273.68 265.53 8.500 1256.50 332.17 964.90 Pass
12075.00 7860.35 12500.00 7936.12 44.34 54.98 273.68 265.53 8.500 1270.98 332.68 978.91 Pass
12095.38 7873.48 12525.00 7950.10 44.38 55.11 273.68 265.53 8.500 1285.46 333.18 992.92 Pass
12115.76 7886.62 12550.00 7964.08 44.41 55.24 273.68 265.53 8.500 1299.94 333.69 1006.93 Pass
12136.14 7899.76 12575.00 7978.06 44.44 55.37 273.68 265.53 8.500 1314.42 334.19 1020.93 Pass
12156.52 7912.89 12600.00 7992.04 44.48 55.50 273.68 265.53 8.500 1328.89 334.70 1034.94 Pass
12176.91 7926.03 12625.00 8006.02 44.51 55.63 273.68 265.53 8.500 1343.37 335.21 1048.94 Pass
12197.29 7939.16 12650.00 8020.00 44.54 55.77 273.68 265.53 8.500 1357.85 335.71 1062.95 Pass
12217.67 7952.30 12675.00 8033.98 44.58 55.90 273.69 265.54 8.500 1372.33 336.22 1076.95 Pass
12238.05 7965.43 12700.00 8047.96 44.61 56.03 273.69 265.54 8.500 1386.81 336.73 1090.96 Pass
12258.43 7978.57 12725.00 8061.94 44.64 56.16 273.69 265.54 8.500 1401.29 337.24 1104.96 Pass
12278.81 7991.71 12750.00 8075.92 44.68 56.29 273.69 265.54 8.500 1415.77 337.75 1118.96 Pass
12299.19 8004.84 12775.00 8089.90 44.71 56.42 273.69 265.54 8.500 1430.24 338.26 1132.97 Pass
12319.57 8017.98 12800.00 8103.88 44.75 56.55 273.69 265.54 8.500 1444.72 338.77 1146.97 Pass
. -- ...,._,....- '-'-..'-........_n. -.-,-........---...--.... ....---.---......---......-,.....-. -,--......----,....-,.....--- ...--,-.-- .-.-..-,.-,.--- .--.--.....-------.....--....-.......---.-...-,.-...---'-.... -.. -".--""..-..' .,.. .---.- .,_. .., -.---- .--,......--...,.. - -..,..---..,,-... -...-.-,--.- '--'-"--'-'.."-'." ..--
<
-
~
~
ç
:;:
83
17
;oj
'-
:¡:
'"
'"
Re: E -104 Surface Cement
('
Subject: Re: E -104 Suñace Cement
Date: Mon, 26 Nov 2001 09:41 :52 -0900
From: Tom Maunder <tom_maunder@admin.state.ak.us>
To: "Wesley, Dave E" <WesleyDE@BP .com>
Dave,
The holidays were great. This note does document our discussion.
Tom
"Wesley, Dave E" wrote:
> Tom
,
> Good morning. Hope you had a peaceful and safe Thanksgiving! We
> discussed last week the possibility of changing the plan for cement excess
> volume on the surface hole for the E-104. I'm writing this note, as
> requested, to confirm that we did reduce our planned excess volume from 350%
> to 300% in the permafrost. I believe we'll still have some excess, but just
> not as much to contend with at surface return. We maintained the 40% excess
> in the surface hole below permafrost.
> Thanks
>
> Dave Wesley, Jr.
> Operations Drilling Engineer
> GPB Rotary Drilling
> 9075645773 Office
> 907 440 8631 Cell
> 9075644040 Fax
> wesleyde@bp.com
(
da\-~Or
--..
r-
Tom Maunder <tom maunder@admin.state.ak.us>
Sr. Petroleum Engineer
Alaska Oil and Gas Conservation Commission
1 of 1
11/26/01 10:00 AM
l
(
~~~iŒ (ffi~ ~~~~[\!A\
ALAS IiA. 0 IL AND GAS
CONSERVATION COMMISSION
TONY KNOWLES, GOVERNOR
333 W. ?T" AVENUE. SUITE 100
ANCHORAGE. ALASKA 99501 -3539
PHONE (907) 279-1433
FAX (907) 276-7542
Lowell Crane
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage AK 99519
Re:
Prudhoe Bay Unit E-l 04i
BP Exploration (Alaska), Inc.
Pennit No: 201-208
Sur. Loc. 4889' NSL, 501' WEL, Sec. 06, TI1N, R14E, UM
Btmhole Loc. 1569' NSL, 1389' WEL, Sec. 25, T12N, RI3E, UM
Dear Mr. Crane:
Enclosed is the approved application for pennit to drill the above referenced well.
The pennit to drill does not exempt you from obtaining additional pennits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required pennitting determinations are made.
Annular disposal has not been requested as part of the Pern1it to Drill application for Prudhoe
Bay Unit E-I04i.
The blowout prevention equipment (BOPE) must be tested in 'accordance with 20 AAC 25.035;
and the mechanical integrity (MI) of the injection wells must be demonstrated under 20 AAC
25.412 and 20 AAC 25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test
before operation, and of the BOPE test performed before drilling below the surface casing shoe,
must be given so that a representative of the Commission may witness the tests. Notice may be
given by contacting the Commission petroleum field inspector on the North Slope pager at
659-3607.
Sincerely,
Gú. fÀ¿~' U~
Cam~echsli Taylo/J--
Chair
BY ORDER OF THE COMMISSION
DATED this 26th day of October, 2001
jjclEnclosures
cc:
Department of Fish & Game, Habitat Section wlo encl.
Department of Environmental Conservation wlo encl.
ALASKA ("
STATE OF ALASKA
AND GAS CONSERVATION COMM(" 'ION
PERMIT TO DRILL
20 MC 25.005
ð(V\ it
to ';;)-5/61
t\OI
Idr:;
1 a. Type of work II Drill 0 Redrill 1b. Type of well 0 Exploratory ~ratigraPhiC Test 0 Development Oil
0 Re-Entry 0 Deepen II Service 0 Development Gas 'Singl~Zone 0 Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. Plan RKB = 64.3' Prudhoe Bay Field / Midnight
3. Address 6. Property Designation Sun
P.O. Box 196612, Anchorage, Alaska 99519-6612 t.~Zi;:Ðlfzs< A9!:- 028277
4. Location of well at surface 7. Unit or Próperty Name 11. Type Bond (See 20 AAC 25.025)
4889' NSL, 501' WEL, SEC. 06, T11 N, R14E, UM . Prudhoe Bay Unit
At top of productive interval 8. Well Number
1469' NSL, 1316' WEL, SEC. 25, T12N, R13E, UM E-104i Number 2S100302630-277
At total depth 9. Approximate spud date
1569' NSL, 1389' WEL, SEC. 25, T12N, R13E, UM 11/15/01 Amount $200,000.00
12. Distance to nearest property line 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 028299, 1389' MD E-10A is 35' away at 601' MD 2560 12887' MD / 8137' TVD
16. To be completed for deviated wells 0 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 300' MD Maximum Hole Angle 56 Maximum surface 2603 psig, At total depth (TVO) 7964' / 3400 psig
18. Casing Program Specifications Setting Depth Quantitv of Cement
~ ize TCD Bottom
Hole Casino Weiaht Grade Couolina Lenath MD TVD MD ND (include staae data)
30" 20" 91.5# H-40 Weld 801 Surface Surface 133' 133' 260 sx Arctic Set (Approx.)
12-1/4" 9-5/8" 40# L-80 BTC-M 5133' Surface Surface 5133' 3797' 837 sx Articset Lite 3 336 sx 'GI
8-3/4" 7" 26# L-80 BTC-M 12887' Surfacd Surface 128871 81371 144 sx Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented MD TVD
Structural
Conductor
Surface
Intermediate
Production RECEIVED
Liner
OCT 1 6 2001
Perforation depth: measured Alaska Oil & Gas Cons. Commission
true vertical Anchorage
20. Attachments 181 Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch II Drilling Program
II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Dave We§ley, 564-5773 Prepared By Name/Number: Terrie Hubble, 564-4628
21. I hereby certify that the ~iS true and u. to the best of my knowledge. Date Ie ---!b-- å'
Signed Lowell Crane 'A -' , . j..-. Title Semor Drilling Engineer
,I --", ~
,i"'.'-""..'",.."""""",.,!:,,,,::,.',,':' ~i:,,:,I,,:~ ~!;I:"'; 11"'I"iI ,,':, ','I,':.' :"")'!": 'I,: "1"'11;1; l'I:I)i'I"":' 1II'Øipli'm:~:"¡I~qt:liillþiji,:!:III:nl"" , 'I::I;::!:I,I.,,}~~!' III' .,,:':,,' ."",:l,'l: "'III':,:
".;".""..,::.:,':'.',1,.,"-'".'. ::::'-' ' :::::;:"':1".:::1,':.,:,','1,1",::.'::.':::.::1.:1;,1'11:!l::"I,:II,';II::")f::,:,~,'I,':':::',;::,:,::"::;::I::I:I!::':I!'::,.I":":."",',..,',.:..:.,;I':\".',.,.",::"':'"',,
Perm~t Numrer 2{)ß API Number ~tf.1 Approval Date See cover letter
~._. . 50- 0 i2f - 2-~3() 9- 00 for other requirements
Conditions of Approval: Samples Required DYes Ji No Mud Log Required DYes ~No
Hydrogen Sulfide Measures DYes 1&1 No Directional Survey Required ŒI Yes DNo
Required Working Pressure for BOPE D2K D3K D4K D5K D10K D15K 0 3.5K psi for CTU
Other: <..Ct.tll'Qt\.-\- ~~\~-'-tLö~ t '"'\"" \4.t>OC~~'t ~C,)~ ~'>-\ /ð jJ.J~pjy-l
Approved By Original Signed By by order of Date
.... ^ .L.. Commissioner the commission
Form 1 0-401 Rev. 12-01-55 " Submit In -rfiplicate
ORtGi[~AL
Re:
(
('
Subject: Re:
Date: Thu, 25 Oct 2001 12:39:12 -0800
From: Tom Maunder <tom_maunder@admin.state.ak.us>
To: "Wesley, Dave E" <WesleyDE@BP.com>
CC: Lowell Crane <cranelr@bp.com>
dO \ -d.a'ó
Dave and Lowell,
No need to re-write or update unless you are planning to change from the 350
which is in the document I have. The question was prompted by my looking at
L-02 and E-104i at the same time. Robert specifies 250% and I noted the
difference. I know from years ago in Kuparuk, that different rigs and portions
of the field have different requirements. This surface cementing has always
been a tough one to fine line. You don't want to pump too much, but the money
you spend to do a top or port collar job if you don't get to surface the first
time buys a lot of cement.
Thanks for the note.
Tom
"Wesley, Dave E" wrote:
> Hey Tom,
> Sorry I missed your call this morning. I was here somewhere running
> around. Probably the coffee pot. In answer to your questions.
>
> 1.) I understand from our SDE, Lowell Crane, that we'll start to freeze
> protect down to the depth of our first GLM. Granted, we only have one in
> this well at -4000' tvd. The norm is 3000' - 3500' tvd. I stated 3500' tvd
> in this proposal, figuring to circulate in a sufficient volume of diesel to
> settle at 3500', rather than attempt to V-tube.
>
> 2.) 350% is a bit heavy. When I generated this program, we had not yet
> cemented the surface pipe on the E-102. In looking back at the most recent
> wells drilled from E-pad, we discovered that one required - 330% excess in
> the permafrost. I wrote it in as 350% to cover the possible need. Having
> just cemented the surface casing on the E-102, I calculated an actual usage
> of -260% excess in the permafrost. If need be, 1'1/ re-write the procedure
> to reflect that and send it to you. Please advise.
>
> Thanks
>
> Dave Wesley, Jr.
> Operations Drilling Engineer
> GPB Rotary Drilling
> 907 564 5773 Office
> 907 440 8631 Cell
> 907 564 4040 Fax
> wesleyde@bp.com
r
0_____-
Tom Maunder <tom maunder@admin.state.ak.us>
Sr. Petroleum Engineer
Alaska Oil and Gas Conservation Commission
1 of 2
11/26/0110:01 AM
Re: FW: E 102i
(
if
>
>
>
>
>
Encoding: base64
Name: E-102i Acal recorded. ZIP
E-102i Acal recorded. ZIP Type: Zip Compressed Data (application/x-zip-compressed)
Encoding: base64
r Tom Maunder <tom maunder@admin.state.ak.us> I
Sr. Petroleum Engineer I
Alaska Oil and Gas Conservation Commission I
I
2 of2
11/26/01 10:00 AM
('"
("'
¡Well Name:
I E-1 04i
Drill and Complete Plan Summary
l.!ïPe of Well (service 1 producer 1 injector)~ Water Injector
Surface Location: X = 664,449.52 Y = 5,976,672.84
Estimated 48891 FSL,501' FEL Sec. 6, T11 N, R14E Umiat
Target Location: X = 658,598.00 Y = 5,983,688.0 TVDss 7991
Kuparuk "C" sands 1469' FSL, 1316'FEL Sec. 25, T12N, R13E Umiat
Bottom Hole Location: X = 658,523.00 Y = 5,983,787.00 TVDss 8075
15691 FSL , 1389' FEL Sec. 25, T12N, R13E Urn
I AFE Number: 15M0512
I Estimated Start Date: 111/15/2001 1
~ Doyon 14
lQperatin~s to complete: 122.03
1 MD: 112,887' 1
1 TVD: 18137.' 1
I BF/MS: 129.8' 1
I AKB: 164.3'
I Well Desig~{conventional, slimhole, etc.).J 9 5/8" X 7" USH-LS (4 Y2" tubing)
~ective: 1
Kuparuk Formation (C - Sand)
Mud Program:
12 1/4" Surface Hole (0-5133' ): Fresh Water Surface Hole Mud
Densitv Viscosity Yield Point API FL PH
I. . \ (seconds) (lb/1 OOft~) (mls/30min)
Initial 8.5 - 8.6 300 50 - 70 15 - 20 8.5 - 9.5
below -2000' MO 9.0 - 9.5 200 minimum 40 - 60 <10 8.5 - 9.5
interval TO 9.6 max 200 minimum 45 - 60 <10 8.5 - 9.5
8 3/4" Intermediate 1 Production Hole (5133' - 12887'): Fresh Water LSND
Interval Density Viscosity PV VP pH API HTHP
',11111) (seconds) Fi Itrate Fi Itrate
,rr ~
Surface <10 by
shoe to 9.5 40 - 60 8 - 12 20 - 25 8.5-9.5 4-6 HRZ
HRZ
HRZ to TD 10.9 40 - 60 12 - 18 20 - 25 8.5-9.5 3-5 <10
E-104i
Page 1
('
Di rectional:
Ver. S er -Sun WP-01
KOP: 300'
Maximum Hole Angle:
Close Approach Wells:
I ntermed iate/Prod uction
Hole
(
56.000 from 2825' MD -12887' MD TD
All wells pass major risk criteria. However E-1 OA is close in
the surface hole section. E-10A is 34.95' ctr-ctr @ 601'. A
surface ro will be re uired to a roximatel 1000'.
Drilling: MWD / GR
Open Hole: Gyro (SSDS Photo) (-1000' MD)
Contingency.
Cased Hole: None
Drilling: MWD/G R/P4Res/PWD/(Recorded
Neu/Den.)
Open Hole: None
Cased Hole: USIT
Formation TVDss TVDrkb Estimated pore pressure, PPG
Tops
Base Gubik 483 547.3
Base Permafrost 1825 1889.3
SV6 1875 1939.3
Mid-Eocene Unconf. 2755 2819.3
SV5 2885 2949.3
SV4 3125 3189.3
SV3 3615 3679.3 ..A .. .. £ ...,. -
SV2 3795 3859.3 " '" -~~
SV1 4170 4234.3
Top UGNU (UG4A) 4680 4744.3
UG3 4915 4979.3
UG1 5410 5474.3 2105 psi 8.7ppQ
WS2I Schrader N 6010 6074.3 2180 8.6
WS11 Schrader 0 6240 6304.3 2215 8.5
Top Colville (CM3) 6415 6479.3 2280 8.2
CM2 7600 7664.3
CM1ITHRZ 7820 7884.3
BHRZI Top Kalubik 7926 7990.3
Kuparuk Upper 7931 7995.3 3400 8.0
Kuparuk Lower 7964 8028.3 3400 8.0
BKUPITMLV 7991 8055.3
OGOC 8010 8074.3
TD 8075 8139.3
TO Criteria 150' below Mi/uveach top
E-104i
Page 2
('
(
C
8
IT b8
p
aSln~lj u Ing rogram:
Hole Casing! WtlFt Grade Conn Length Top Btm
Size Tbg O.D. MDfTVD MDrrVD bkb
30" 20" 91.5# H-40 WLD 80' GL 133'/133'
12 %" 9 5/8" 40.0# L-80 BTCM 5133' GL 5133'/3797'
83/4" 711 26.0# L-80 BTCM 12887' GL 12887'/8137'
Tubing 4 Y2" 12.6# L-80 NSCT 12530' GL 12530'/7935'
Cement Calculations:
The following surface cement calculations are based upon a single stage job using a port collar as
contingency if cement is not circulated to surface.
Casin Size 9 5/8" Surface
Basis: Lead: Based on 1981' of annulus in the permafrost @ 350% excess and 2269' of open
hole from top of tail slurry to base permafrost @ 30% excess.
Lead TOC: To surface
Tail: Based on 500' TVD open hole volume + 30% excess + 80' shoe track volume.
Tail TOC: At -4250' MD 3297' TVDbkb .
Total Cement Volume: Lead 662 bbl I 3717 ft I 837 sks of Dowell ARTICSET Lite 3 at
10.7 and 4.44 cf/sk.
Tail 70 bbl I 393 ft I 336 sks of Dowell Premium 'G' at 15.8
and 1 .17 cf/sk.
Casin
Basis:
Tail: Based on TOC 500' MD above top of Kuparuk target and 30% excess + 80' shoe
volume
Tail TOC: 12130' MD, 7716' TVDbkb
Total Cement Volume:
Tail
30 bbls I 168 ft I 144 sks of Dowell Premium 'G' at 15.8
and 1 .17 cf/sk.
E-104i
Page 3
(
(
Well Control:
Surface hole will be drilled with diverter. The intermediate hole, well control equipment
consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer
will be installed and is capable of handling maximum potential surface pressures. Based upon
calculations below BOP equipment will be tested to 4000 psi
Diverter, BOPE and drilling fluid system schematics on file with the AOGCC.
Production Interval-
. Maximum anticipated BHP:
. Maximum surface pressure:
3400 psi @ 7964' TVDss - Kuparuk UB
2603 psi @ su rface
(based on BHP and a full column of gas from TO @ 0.10 psi/ft)
. Planned BOP test pressure:
. Planned completion fluid:
4000 psi
8.6 ppg filtered seawater / 6.8 ppg Diesel
Disposal:
. No annular injection in this well.
. Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind
and inject at DS-04.
. Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-
04 for injection. Haul all Class I wastes to Pad 3 for disposal.
E-104i
Page 4
(
(
DRILL AND COMPLETE PROCEDURE SUMMARY
Pre-Rig Work:
The 20" conductor has been set.
1. Weld an FMC landing ring for the FMC Gen 5 (Split Uni-Head) wellhead on the conductor.
2. If necessary, level the pad and prepare location for rig move.
3. Ensure any required plugs and I or well shut-ins have been accomplished in nearby wells for rig move
and close approach concerns.
Rig Operations:
1. MIRU Doyon 14.
2. Nipple up diverter spool, and function test the diverter. PU 5" DP as required and stand back in
derrick.
3. MU 12 1/4" drilling assembly with MWD/GR and directionally drill surface hole to approximately 5133'
MD I 3797' TVD. The actual surface hole TD will be +1-100' TVD below the top of the SV3 sands.
4. Run and cement the 9 5/8",40.0 Iblft. surface casing back to surface. A TAM Port collar or stage tool
will be run in the casing string to allow secondary cementing, in the event cement is not circulated to
surface during primary cementing operations.
5. ND diverter spool and NU casing I tubing head. NU BOPE and test to 4000 psi.
6. MU 8 3/4" drilling assembly with MWD/GR/P4Res/PWD and RIH to float collar. Test the 9 5/8" casing
to 3500 psi for 30 minutes.
7. Drill new formation to 20' below 9 5/8" shoe and perform Formation Integrity Test.
8. Drill ahead through Ugnu and Schrader intervals. Trip for bit and DenlNeu sensors.
9. Drill ahead to a depth of -150' md below base Kuparuk. Condition hole for casing run, as needed.
Minimally, circulate two full hole volumes. POOH laying down all 5" drill pipe.
10. Run and cement the 7" production casing as required to cover all significant hydrocarbon intervals.
Displace the casing with seawater during cementing operations and freeze protect the 7" x 9 5/8"
annulus as required.
11. R/U slick-line and make a Gauge ring I Junk basket run to TD.
12. Test the casing to 4000 psi for 30 min.
13. R/U Schlumberger; Run a USIT log, as required for an Injector well.
14. Run the 4 1/2", L-80, NSCT connections, completion assembly. Test the production casingltubing
annulus to 4000 psi and the tubing to 4000 psi.
15. Nipple down the BOPE. Nipple up and test the tree to 5000 psi.
16. Freeze protect the well to -3500' TVD (4600' MD) and secure; set BPV and test to 500 psi.
17. Rig down and move off.
Estimated Spud Date:
11/15/2001
E-104i
Page 5
(
(
E-104i
Job 1: MIRU
Hazards and Contingencies
~ Standard Operating Procedures for H2S precautions should be followed at all times.
The highest level of H2S recently measured on E-pad was <50 ppm, (1999). The closest
wells, regarding SHL, are E-10 and E-11, each measuring <10 ppm at last testing, (2000).
The closest wells, regarding BHL are E-100 and E-101, each measuring <10 ppm.
~ The closest surface locations are E-10 and E-11. E-10 is 37' North of well E-104i. E-11 is 72'
South of well E-104i. No surface shut-in's will be required.
~
Reference RPs
.:.
Operational Specifics:
. Notify AOGCC 24 hours advance for BOP test witness.
. Post drilling permit with summary of drilling hazards in doghouse prior to spud.
. Review the E-Pad data sheet & post in doghouse & field office.
Job 2: Drillina Surface Hole
Hazards and Contingencies
~ No faults crossings are expected in the surface interval of E-104i.
~ There is one "close approach" issue in the surface hole. All wells pass major risk criteria. The
closest well is E-10A at approximately 35' center-to-center at 601' MD. Have the SSDS Photo
Gyro on hand as a contingency, in the event magnetic interference affects MWD directional.
~ The SV4 sand may contain gas hydrates, though little or none are expected. Hydrates will be
treated at surface with appropriate mud products.
Reference RPs
.:.
OperaüonalSpecifics:
.:.
",.-......"....;,. "." ."'.,.".."..",.,,"',,.,,-~...._...... .OM"""_""",""""'"," "'". '" .""'",,, ".. " , "..~..,-""""-~.."....,.",.--.",.,..~.."'"., .,"'....."'"',"' """" .."""..,..,,"""......,., ,.., """,.,,'~=..
Job 3: Install Surface CasinQ
Hazards and Contingencies
~ It is critical that cement is circulated to surface for well integrity. 350% excess cement through the
permafrost zone (and 30% excess below the permafrost) is planned. As a contingency, a 95/8"
TAM port collar will be positioned at:l:1 OOO'MD to allow a secondary circulation as required.
Reference RPs
.:.
Operational Specifics:
.
E-104i
Page 6
("
(
Job 7: Drillina Intermediate I Production Hole
Hazards and Contingencies
Þ> No fault crossings are expected in the Intermediate / Production interval of E-104.
Þ> The surface casing point is chosen just below the SV3 sands, leaving the SV1 exposed for the 8
3/4" hole. Differential sticking across the SV-1 sands has not been identified as a major issue,
though the potential exists.
Þ> KICK TOLERANCE: In the worst case scenario of 8.0 ppg pore pressure at the Kuparuk target
depth, a fracture gradient of 12.5 ppg at the surface casing shoe, and 10.3 ppg mud in the hole,
the kick tolerance is 131.7 bbls.
Þ> The mud program states that the mud weight will be 9.5 ppg from drill out of the surface shoe to
above the HRZ. The mud weight will be increased to 10.3 ppg to drill the HRZ and maintained to
TD. Due to an expected Kuparuk pressure of - 3400 psi (8.0 ppg), attention to possible lost
circulation and differential sticking is essential.
Reference RPs
Operational Specifics
.
- ,*--"'", "'"""
,,- "
"'" '" "" """"""""'"
Job 8: Log Production Hole
Hazards and Contingencies
~ No production hole logging program is planned for this well.
~
Job 9: Case & Cement Production Hole
Hazards and Contingencies
Þ> It is expected that the Ugnu and Schrader will be wet. For this reason, the plan is to cement the
7" casing to, minimally, 500' md above the Kuparuk reservoir (the uppermost significant
hydrocarbon). The top of the hydrocarbon interval should be verified with LWD resistivity log. The
"Top of Cement" depth should be confirmed.
~ The well will be underbalanced after displacing the cement with Sea Water. Verify that the Floats
are holding before continuing operations and hold pressure on the well if they are not holding.
~ E-104 is planned as a water injection well. As such, a cement bond log will be required. A USIT
log will be run from the 7" float collar to above the calculated top of cement to verify adequate
cement bond.
E-104i
Page 7
~"
,(
Reference RPs
.:.
OperailonalSpecifics:
.
Job 12: Run Completion
Hazards and Contingencies
~ No hazards specific to this well have been identified for this phase of the well construction.
Reference RPs
.:.
Operational Specifics:
.",."""""" ."""",."".,,'u
,,~"
,...n,,_.. ",.".. "'" ,.,"'~" ,..",,"'.
,."."""""",." "" "" """'" ..",........,.........""",........".... '" ".... "n'""..
..,....... ..
Job 13: ND/NU/Release Ria
Hazards and Contingencies
~ No hazards specific to this well have been identified for this phase of the well construction.
Operational Specifics:
E-104i
Page 8
{' )ST THIS NOTICE IN THE DOGHOUSE("
E-104i Rig site
Summary of Drilling Hazards
./ Standard Operating Procedures for H2S precautions should be followed at all
times. The highest level of H2S recently measured on E-pad, in the last 12 months, was
on E-02A, E-05A, E-OB, and E-2BA @ 10 ppm, (September 2000).
./ Well E-10 is located -37' North and E-11 is located 72' South of planned well center.
./ E-10A presents a close approach issue in the suriace hole. All wells pass major risk
criteria. Nearby well E-10 will be as close as 35' center-center @ 601' MD.
./ Be prepared for possible coal seams at the top of the UGNU.
./ Continue best practices for well control during drilling the UGNU. Monitor for signs of a
kick.
./ The pressure in the Kuparuk is expected to be in the range of 3400 psi. Initially, it was
-4100psi. The HRZ will require a mud weight of about 10.3 ppg. The Kuparuk will be
equivalent to -B.O ppg. Be prepared for possible lost circulation and differential sticking.
./ Lost circulation may also be experienced while running 7" casing. The SSD lost
circulation tree should be followed if lost fluid returns are encountered.
CONSULT THE PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL
INFOR.MATION.
E-102i
KB. B...EV =
BF. .B...EV =
KOP=
Max Angle =
Datum MD =
Datum TVD=
est. @ 64.8
est. @ 30.2
300
560 @ 2825'
12737' bkb
8053' SS
~'
E-104i
11000'
12200'
15500'
112460'
112629'
DATE REV BY COMMENTS
08/02/01 DWesley Original Proposed Completion
5133' I
9 5/8" 40# L-80
BTCM
4-1/2" 12.6# L-80
NSCT Prem. Conn.
I Minimum 10 = 3.725"
PER FOR AT 10 N SUM MAR Y
REFLOG:
ANGLC'"ÃT TOP PERF: I
Noto:RofortoProductloo DB tor historical porfdo,a
SIZE S P F INTERVAL OpO/Sql D A 'E
I PBTD
7" 26# L-80 BTG-M I
I 12806' I
I 12886' I
112480'
112500'
112515'
112530'
I(
SAFETY NOTES
9 5/8" TAM Port
collar
'X' Nipple, 3.813"ID I
4 1/2" X 1" KBG-2
GLM
I X' Nipple, 3.813" ID I
7" X 4 1/2" Baker S-
3 Prod. Packer
X Nipple, 3.813" I.D.
XN'Nipple, 3.725"10
I 41/2' WLEG
Short Joint & RA tag
@ TKUP
PRUDHOE BAY UNIT / Midnight Sun
WB...L: E-104i
ÆRMrr No: 200-71?
API No: 50-029-*****
Sec. 6, T11 N, R14E, 500' FB..., 353' FNL
BP Exploration (Alaska)
aN!Æl.J[AlE
1JfJŒ
COMPANY DETAILS
BPAmoco
Calculation Melhod: Minil]Rnn Cur"'ture
Error S)""m: ISCWSA
Scan Method: TrayCylinœrNorth
Error Surlåœ: ElliptioåJ + C",,;og
Warni"" Method: Ru\e$ Based
- ---------
r,
--i+tc
_n - -----
Start Dir 1.57/1 00' : 300' MD, 300'TVD
Base Gubik
Start Dir 2?1100' : 633.33' MD, 632.91'TVD
- -Start Dir 2.57/100' : 883.33' MD, 880.69'TVD
150
. EndDir : 1816.27'MD, 1747.2'TVD
Start Dir 47/1 00' : 2055.41' MD, 1950'TVD
___-n'-
ne Unconfonnity
300
E
~
C>
C>
.,...
~
..c
E..
...
0
-a
.~
t
>
450
...
:>
....
E-
600
750
900
0
1500
Plan: E-1O4 wpOI (E. (l4Il'lan E. 104)
.11
REFERENCE INFORMATION
SURVEY PROGRAM
Depth Em Depth To Sur."'Y¡PIan
Dale:
Co-<>rdiæ\e (NiE) Reference: Well Centre: E-IO4, True North
Vertical nVD) Referenœ: 62' 62.00
Section (VSj Reference: Slot. (O.oo.',O.ooE)
M<aSUred Depth Reference: 62' 62.00
Calculation Method: Miuinnnn Curvature
Tool
Dale: ~1112U\)1
l'reatcd By: K<"I1 Allen
Checked: -
CB-GYRO-SS
MWD
62.00 1000.00 PIanœd: E-I().l wpOl VI
1000.00 12886.48 PIanœd: E.I().l wpOl VI
FORMATION TOP DETAILS
No- TVDPath MDPath Formation
I 545.00 545.17 Base Gubik
2 1887.00 Jr¡~1.13 Base Permaftost
3 1937.00 :lw).08 SV6
4 2817.00 '....1.25 Mid-Eocene Unconformity
5 2947.00 1,.1~.50 SV5
6 3187.00 m~ 1.26 SV4
7 3677_00 ~'n;¡.66 SV3
8 3857.00 ',:~1).23 SV2
9 4232.00 "JII1.18 SVI
10 4742.00 ,,~: 1.30 UG4a
II 4977.00 )..~ 1.14 um
12 5472.00 1\1" ;.46 UGl
13 6072.00 "I '! 7.38 WS2!Schrader N Sands
14 6302.00 .".11)\.28 WSI/Schrader 0 Sands
15 6477.00 "":'1.92 CM3
16 7662.00 1.'-'1.7.95 CM2
17 7882.00 L'~ 111.98 CMlrrHRZ
18 7988.00 l:r.:11.35 BaseHRZ
19 7993.00 L'r.:'1.29 Top Kup. Upper Unit
20 8026.00 L".;..~.24 Kup. Lower Unit
21 8053.00 !.:'ï .'i.48 BKUPrrML V
22 8072.00 L: I il).42 GOC (original)
3000
4500
6000
Vertical Section at 321.45° [I 500ft/in]
Rniewed: ---
Date:
Nalœ
-Fl.W
1986.83
WELL DETAILS
Northing FAsting lalltud: 1."'8lt"""
5976673.00 664450.00 7lf20'3326ON 148".J9'~~.QI2W
NA
Sk"
"N'-S
E-l().l 3470.13
TARGET DETAilS
Na""
TVD
"N'-S
-El-W
Nor1hmg
~983688.4~
Fasting Shape
6~~~98.13 Cud: (RAINS: 200)
E-I().I Tl
8053-00 7142.62 -~6%.96
SECTION DETAILS
See MD mc Azi TVD +NI-S +EI-W DLeg TFace VSec Target
I 62.00 0.00 0.00 62.00 0.00 0.00 0.00 0.00 0.00 -l~
2 300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00
3 633.33 5.00 270.00 632.91 0.00 -14.54 1.50 270.00 9.06
4 883.33 10.00 270.00 880.69 0.00 -47.16 2.00 0.00 29.39
5 1100.55 15.00 280.00 1092.72 4.88 -93.73 2.50 28.35 62.23
6 1816.27 32.00 295.00 1747.20 101.90 -358.98 2.50 26.51 303.39
7 2055.41 32.00 295.00 1950.00 155.46 -473.83 0.00 0.00 416.85
8 2824.76 55.96 323.88 2504.95 507.62 -855.69 4.00 51.47 930.23
9 12736.48 55.96 323.88 8053.00 7142.62 -5696.96 0.00 0.00 9136.33 E-I04 Tl
10 12886.48 55.96 323.88 8136.96 7243.04 -5770.23 0.00 0.00 9260.51
CASING DETAILS
No. TVD MD Name Size
1 3797.00 5133.04 9518" 9.625
2 8136.96 12886.47 7" 7.000
All TVD depths are
ssTVD plus 62' for RKBE.
_.~.
CMlrrHRZ
, BaseHRZ
/ -/ . Top Kup. Upper Unit
I ./ Kup. Lower Unit
BKUPrrML V
== GOC (original)
Total Depth: 12886.48' MD, 8136.96' TVD
---.-- --- .
;
7500
9000
10500
12000
13500
COMPANY DETAILS
BP Amocû
Calculatioo Method; MinilIl\lID C""..lure
Enor Sy,oem: ISCWSA
Sc2nMetbOO; TravCvlinderNonh
Error Surfàœ: EUipticãl ~ C.,ing
Wamin« Method; Ruk:s Based
900
750
Total Depth: 12886.48' MD, 8136.96' TVD
~ Northern Fault
7" '~I
"! 75% conf.
REFERENCE INFOIL>,IATION
SURVEY PROGRAM
Wellpalh: (F-(J41Plan 1'.-1041
. ~
T()()I
Depth I'm D<pth T" SlIlv<)"iPlan
62.00 1000.00 PIanœd:E-H}4wpOIVI
1000.00 12886.48 PIanœd: E-I()' wpOI VI
Re\iewed:
Dale:
End Dir : 2824.76' MD, 2504.95' TVD
/
Dale: g'_10'2001
ere-dIed By: Ken Allen
Checked:
Dale: -
Co-ordinate (WE) Ref<renœ: Well Centre: E-I()'. True North
VerticaJ (TVD) Ref<renœ: 62' 62.00
Sectioo (VS) Rekren<:": Slot - (O.oo.',O.OOE¡
Mæsured Depth Ref<ren<:e: 62' 62-00
Cakulation Method; MinimDn Curvature
CB-GYRO-SS
MWD
Name
-E.'-W
YfELL DETAILS
Nor1hing Ea>ling Lautu<k I.oogllu<k
5976613.00 664450.00 7W20'33260N 148"39'55.012W
N'h
Siol
-N'-S
E-I()' 3470.13 1986.83
TARGET DETAILS
Name
TVD
,N'.S
E.,oll1g Shal"
6<8559.95 Pol)'8""
658598.13 ('ire'" (RadIUS: 200)
658598.13 Polyg<>n
~Fj-W
1'0'011111118
5984338.44
5983688.45
5983688.45
Nonœm Fauh
E-I()' 11
E-I()' PoIYg<>D
7972.00 77933~ -5720.87
8053.00 7142.62 ."696.96
8053.00 7142.62 ."696-96
SECTION DETAILS
See MD Inc Azi TVD +N/-S +EI-W DLeg TFace VSec Target
I 62.00 0.00 0.00 62.00 0.00 0.00 0.00 0.00 0.00
2 300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00
, 3 633.33 5.00 270.00 632.91 0.00 -14.54 1.50 270.00 9.06
6000 I I ' \j .,.x VV y /'-----.../~ /Z.--. ~ ~ I 4 883.33 10.00 270.00 880.69 0.00 -47.16 2.00 0.00 29.39
, I I
5 1100.55 15.00 280.00 1092.72 4.88 -93.73 2.50 28.35 62.23
6 1816.27 32.00 295.00 1747.20 101.90 -358.98 2.50 26.51 303.39
7 2055.41 32.00 295.00 1950.00 155.46 -473.83 0.00 0.00 416.85
8 2824.76 55.96 323.88 2504.95 507.62 -855.69 4.00 51.47 930.23
9 12736.48 55.96 323.88 8053.00 7142.62 -5696.96 0.00 0.00 9136.33 E-104 TI
10 12886.48 55.96 323.88 8136.96 7243.04 -5770.23 0.00 0.00 9260.51
c
~ 450
0
0
V)
~
+'
):'
t::
0
~
):'
:;
0
çn
300
150
All TVD depths are
ssTVD plus 50' for RKBE.
¡
-6000
-3000
-4500
CASING DETAILS
No. TVD MD Name Size
I 3797.00 5133.04 95/8" 9.625
2 8136.96 12886.4 7 7" 7.000
FORMATION TOP DETAILS
No. TVDPath MOPath Formation
I 545.00 545.17 Base Gubik
2 1887.00 1981.13 Base Pennafrost
3 1937.00 2040.08 SV6
4 2817.00 3382.25 Mid-Eocene Unconfonnity
5 2947.00 3614.50 SV5
6 3187.00 4043.26 SV4 -....
7 3677.00 4918.66 SV3
8 3857.00 5240.23 SV2
9 4232.00 5910.18 SVI
10 4742.00 6821.30 UG4a
II 4977.00 7241.14 UG3
12 5472.00 8125.46 UGI
13 6072.00 9197.38 WS2/Schrader N Sands
14 6302.00 9608.28 WSl/Schrader 0 Sands
15 6477.00 9920.92 CM3
16 7662.00 12037.95 CM2
17 7882.00 12430.98 CMlrrHRZ
18 7988.00 12620.35 Base HRZ
19 7993.00 12629.29 Top Kup. Upper Unit
20 8026.00 12688.24 Kup. Lower Unit
21 8053.00 12736.48 BKUprrMLV
22 8072.00 12770.42 GOC (original)
Start Dir 41100' : 2055.41' MD, 1950'TVD
/ EndDir: 1816.27'MD, 1747.2'TVD
j lL Start Dir 2.5/100' : 883.33' MD, 880.69'TVD
Start Dir 2/100' : 633.33' MD, 632.91'TVD
Start Dir 1.51100' : 300' MD, 300'TVD
-1500
West(-)Æast(+) [I 500ft/in]
0
1500
30
(' BP Amoco {
Planning Report - Geographic
~""-""~"----"...-- ..--
--------'--"----""'------,
Company: BP Amoco Date: 8/1/2001 Time: 09:41:58
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: E-104, True North
Site: PB E Pad Vertical (fVD) Reference: 62' 62.0
Well: E-104 Section (VS) Reference: Well (0.00N,O.00E.321.45Azi) .
"', ~~~~~-~~_.~ .~~~~__E~~~_. ---- ------------_n_._-_.__._------_...._._-_....._----___.!~an: .---------..-----------____':-1 ~_~?..92___----- ..... ~--_._------------ --------------..-------------.1
-----------------,..--,,--------- '--n--'.._--. -----"--"-- --""'-~-'--~-~-"--"-----------"--'----""--~""'------------'-----'-...---- -..- -- --- -..- --,,_..--~
Field: Prudhoe Bay
North Slope
UNITED STATES
, Map System:US State Plane Coordinate System 1927
: Geo Datum: NAD27 (Clarke 1866)
! Sys Datum: Mean Sea Level
Page:
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
BGGM2001
I
i
. u_- ------._.._-_..~.___nl
...,. -_..._.._.-------~_..---- ----.------- --..--.-----------..--.--------------- ....__--_----n_...._-----...~---- - --...-
...--..--------- --- -------..---- --..,,------
~ -- -----...--~ -- --.------ .. -------- - -----------_......_~
- . ---- - ... -,~----
I Site:
PB E Pad
TR-11-14
UNITED STATES: North Slope
Site Position: Northing:
From: Map Eastlng:
Position Uncertainty: 0.00 ft
Ground Level: 0.00 ft
5973160.88 ft
662538.97 ft
Latitude: 70 19 59.134 N
Longitude: 148 40 53.054 W
North Reference: True
Grid Convergence: 1.24 deg
- ----..----- -- ..--.m. - ----"......,--....-..---..-- ._-- -..--". -- --._.--.~.._--_._--------------...._..-._---_. ....----..... --.~.
. -- --.... _.,-..--......
_m..- ..----
....- -.___----_n..._......._-----------,...---..------..........,-..---....---.....---...----"'-"-.---.---...--------""""'-----'-----..-- ,.._~
Well:
E-104
Slot Name:
Latitude: 70 20 33.260 N
Longitude: 148 39 55.012 W
Latitude: 70 20 33.260 N
Longitude: 148 39 55.012 W
Inclination: 0.00 deg
Azimuth: 0.00 deg
Surface Position: +N/-S 3470.13 ft Northing: 5976673.00 ft
+E/-W 1986.83 ft Easting: 664450.00 ft
Position Uncertainty: 0.00 ft
Reference Point: +N/-S 3470.13 ft Northing: 5976673.00 ft
+E/-W 1986.83 ft Easting : 664450.00 ft
Measured Depth: 62.00 ft
Vertical Depth: 62.00 ft
.....---.,.-..-.. -'--..........,..-.........
. -"....__.....--._.._~- ... ""'-"".""'--"'--"---"--"'~"""_.. """"-"-"--""""'-----"""'-"'."--'-""""'-------""-""'--'----------.._---------------,--,_...- ...--.- .--.. ----- --00--'._"""'--""'-""-
..--"..----......... '-".-..----...'----..-...
. _,..m. '.....""" .. ----..----- ------'-"--.""'00--"---_""" . ~ .."'-"--"""'--"""-""---"."--"'----""'.'---""'------""'---"--'-""'- ..._m.' ....
......-- .. - ...... .
""""", ..----.
Wellpath:
Plan E-104
Current Datum:
Magnetic Data:
Field Strength:
Vertical Section:
62'
Height
Drilled From: Well Ref. Point
Tie-on Depth: 0.00 ft
62.00 ft Above System Datum: Mean Sea Level
Declination: 26.64 deg
Mag Dip Angle: 80.82 deg
+E/-W Direction
ft deg
,~.. "'" ""'-""""--"--"'-----,...._._._--.._,,-..,--.....,......,...~--._...-------..................._,--_..._....---........,......"~.._,,........_.--...--
0.00 321.45
. ----,--""""",,---
7/27/2001
57497 nT
Depth From (TVD)
ft
0.00
+N/-S
ft
""----""'-"-"-""-'" ...
0.00
.........-. ..." ...m..--,.......,...",----_....... "'-",-----""~-"',"'--"...m--- . --""'-'-""-"""-""----"""-'""'--""""--"'--'--""---'..."'-..--...---..--..----"'.'-'--""'--""-"""-'-"""------"'-'-'-""'-""---"'--"""""""...".,......
.-..--,....--.....-----..............--,--...-----"
Plan:
E-104 wp01
Date Composed:
Version:
Tied-to:
7/27/2001
1
From Well Ref. Point
Principal:
Yes
, ....-,....-- ...,.. "...' ...-.",.. --"""--"""-"""""""'-"'----"--"--"""""""--"'--"""'-~"'---------""'--"""---.....--..--...... "--"'-------'----"--'..-------------....--------...--.----.----------------~--"""----""----"----"----"'--~'--~~"-"'-----"'"
Plan Section Information
..... ,......._, ..."..,."'."""~.,- """"""""""."..,."""",-",...--.,--....., ".." .....".--:- """'----.','.""""""-'c""-' ""'" ..."",~,~,:,.~- ._-:".--",__",-""","-""-,_.,-,....,--,..._".,~-.,--...".-_.-""'-'-'"7.-""""""""'-':".',.,"'-'-:-",",."""-"""-"'-"'--,""'.-"'-:,-'-."".""'.-"""""', ~._-.."..,_.,--....". ....-'--..'.-:. ...,""""""...--.-. ..,..,-...",,-.....,
; MD loci, Azho "TVD. .fN/..S .,+E/~W . . DLS~,~uild ,.,:Furn , TFo. .,Target " .",'
. ft..'. ;,dØg,;,.,'. ", .degi:,:, ,..,:';.".:,ft.,...;,....";.....'.,."..".<#."...'..,,/'.'..'.A..i:.....,dê9/1Qøfta~9(1øqftCl~g/1PPft',..:;d(;}g.'.,.",' '.'.,' ..'.' , . ': .."',...',, ....,...'", :...' '.
,--..., . ...-- ...--~--._,....,............ "'.'."""""""---.-"'-'. .'--.--'--- "'."""""""".--""."""""'.""""""""'--' "---"""'-----"""'.".""""---'.'-"'--'.'--"""'-""'-'--""""-.'"".-"""".'--".-"."'.---'----"-""'--'-"'.--"'-"--.-"'-"'-"""'-"'-".---"'."...'."."""'.-"--'-.""".'.----"'.' .......-.",...0......,.........,.....,...".....- "-.....--,,..."'.,...,...
62.00 0.00 0.00 62.00 0.00 0.00 0.00 0.00 0.00 0.00
300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00
633.33 5.00 270.00 632.91 0.00 -14.54 1.50 1.50 0.00 270.00
883.33 10.00 270.00 880.69 0.00 -47.16 2.00 2.00 0.00 0.00
1100.55 15.00 280.00 1092.72 4.88 -93.73 2.50 2.30 4.60 28.35
1816.27 32.00 295.00 1747.20 101.90 -358.98 2.50 2.38 2.10 26.51
2055.41 32.00 295.00 1950.00 155.46 -473.83 0.00 0.00 0.00 0.00
2824.76 55.96 323.88 2504.95 507.62 -855.69 4.00 3.11 3.75 51.47
12736.48 55.96 323.88 8053.00 7142.62 -5696.96 0.00 0.00 0.00 0.00 E-104 T1
12886.48 55.96 323.88 8136.96 7243.04 -5770.23 0.00 0.00 0.00 0.00
""---'~"-~"','--"" """"--"---"""""-""""-"----"".,---.","__"00",,,,--_,,,,,,,--,,,,----.-..--_.__m-..........--..........,,--......-.......-..-....,-...- """",,"'-......'m_..-__.._.......--...."......,..................--_.....~--..._.........--..._m.._.....,....................--......,..--.....
Section 1: Start
"'" '."'-""."'--"'-..""""'."-""'~'--""" .......,. ---.."...,--..".----......-........----,.--.,-,-,..--......--.....-.,:-,..."""""::--""")c.-",,,,,------,--"':c-,-'c""""""'.-'-;:c,""""',:"".'..--,..-,'c,:,-'."c,"'--~"--""'-"_."":'-,'-"""'-'._",--",,---,"""---""',-""""""."""""".--""-"""""'c,'---"-:"'-:-.--"--....,.......- -...".",,---.- ........
MD locI Azim TVD+N/-S +E/..:W VS"DLS. Build .T..ro. TFO
ft deg . deg . ft . . ft . ft . .. ft. " cleS/tOOft deg/tOOftdeg/tQOft des .
.... . """"-".".""""""" ,.., "-'.-""""""'."""""'--"'--- ..,.........." "".'--'-.--""-..'-- .................".................--.-.."c..........----,..........,"................,-...~...,.",._.........,......--,c.,-,.__. ,.,."""",_"",.""",".,-,"-..--._.",._~.;-".'.....,....c....--.............._.....-._,-,.",----.,--""."",-"""---...,~._~",."~,-,,,._.,,--.. ,.........,... ,.....,..,.--"...."..,,'.., ""."""'"
62.00 0.00 0.00 62.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
100.00 0.00 0.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
200.00 0.00 0.00 200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- --.-.........
""""'~""'~'--'----_"_"m--....._--_...._.....-.--....._--_......,._",--,...,.mo. ""'----"----"""-"-."'....m-....-_.-""-,,-""-""-""""""""-,,-,,---_..-----...~---. --..~_..~"m....
f f
BP Amoco
Planning Report - Geographic
~
. Company: BP Amoco Date: 8/112001 Time: 09:41 :58 Page: 2
I Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: E-104, True North ..
: Site: PB E Pad Vertical (TVD) Reference: 62' 62.0 :
. WeD: E-1O4 Section (VS) Reference: Well (0.00N,0.00E,321.45Azi) !
1 WeDpath: Plan E-104 Plan: E-104 wp01 I
,. ..----...-..----.--.---..-.-.-,,-..-- ---..- --...---.-- --------, ,-...---.-..-----.-- - ------.-------.-.---.. ---------..--. -------.----.------------,----.-----.----. --.-----.---.---..----.. .---.-----------...-- ---,---_._,
Section 2: Start
c---'-MD---- Incl------'--Äzi~------'---TVli---- +N¡:S---- +Ê/-W----- VS . DLS - Build TU~-;;-----TFO---------'-"'----l
, ft deg deg ft ft ft ft deg/100ft deg/100ft deg/10OO deg I
r . ..- --- ----.-.----..------ -------------"-"'-------------""----------'--'----------------'----'-_-__'_h____'_--------"'-'-----------'---- ----,-,---..-..-.- ...--.....---- ---- -.. -- .._--,_._.. '----"
400.00 1.50 270.00 399.99 0.00 -1.31 0.82 1.50 1.50 0.00 0.00 i
500.00 3.00 270.00 499.91 0.00 -5.23 3.26 1.50 1.50 0.00 0.00 I
600.00 4.50 270.00 599.69 0.00 -11.77 7.34 1.50 1.50 0.00 0.00 I
~33-,-~~_- --- .---~:_~~-----~7-°'~~--------~~?:~~...------,~'0~----.._-~~-~"-~.____m-- - .?.E~__..~-~ ~~~____.1--'_~~_n_.__~~~~-----_._~:~~------ -------- -__n-I
Section 3: Start
-- .---... ----" -..-- ----m------" -- - -- ..-- -------....-- -.. - ---- -- --.-.- -- ----------------- '----------'----------' ----n.-------------- '-'-"-'-- -. -- _.-- -'. -."'--.-- -- -.---"---------- --.--- -.- ------.-. --_. ..-.- ..--
MD Incl Azim TVD +N/-S +E/-W VS DLS Build Turn TFO
ft deg deg ft ft ft ft deg/100ft deg/100ft deg/10OO deg
--"-- ..-.., .".... .-,,-.- .--- --..--..-.....---.-.-...--,..----..-. ........-----...-----...-------.-.-,---..,.----------."",,-, -""-------'---"'--"'-----""'----"'---"'---"-""--'-""'-- --.-......,.......--"-...---u..,....------,...-----....,..........-,.."',,,,-,,...--........-..,...."..--..,...-'.- ""'" "-"",,
700.00 6.33 270.00 699.25 0.00 -21.12 13.16 2.00 2.00 0.00 0.00
800.00 8.33 270.00 798.43 0.00 -33.89 21.12 2.00 2.00 0.00 0.00
883.33 10.00 270.00 880.69 0.00 -47.16 29.39 2.00 2.00 0.00 0.00
".. ..........-.....-..............-.--......--,,-.....,,- ---"..--...--........"""'.----...---....--,---........--.-.--,---."........._-----"......,..,-".._--...-'.
-- -............--....-.
.l
Section 4: Start
.. ...... ..".. ,,_._. ""-"-""'--"'-"""'--'-' "'-"---""-----"'.. """""...-.. '-u'-'-""'-C------'---"-'-'--"---"---"'--~-"'-"""-"""- ------"--"--'---"------"-""""-"'--;-----------"""', """"""',-"c--"---'c--"-""-.--""""" --..-..,..,.--...-,- ---'."'----""'-' ,.... ---.... -"-
MD loci
ft deg
"""'.""_.".""""'-,-"".......""._,---..._,.- ,
900.00 10.37
1000.00 12.64
1100.55 15.00
~im TVD +N/-S +E/-W VSDLS. Build Turn. TFO
..-- --",,~:~~....:,,--. -..-.. ..."._"....,,"_._~-" _...."_....c_-~~,,..:~-~",...,,_._... -----,-"'~-,--, _...._._,--,---!~..~..c._.,~-,:"","~~~~~R~~.,~:~~:~,~?~., d_~~,~~ ..~~9~_".,_.."". --~ ~~------.."... - """'--",,.
271.10 897.10 0.03 -50.11 31.25 2.50 2.21 6.60 28.35
276.34 995.08 1.41 -69.98 44.71 2.50 2.27 5.24 27.27
280.00 1092.72 4.88 -93.73 62.22 2.50 2.34 3.64 22.14
....-----..,....."""'-"--."'-.' _..
. "'-""--"""-----"..-----.------------.------....-.............- ". ...-_.. ",.--..---------------------.------------...-----------.----..----..--.-..---- --------...--..--"..."...--.--.. ...--.-.-.---.
Section 5: Start
- : """ ... ..- , -"'1'1D"-'-- .. -i~-;i- "'- -"'-'-""'¡;j~"-"""" ..-. -------TVDu---- "'-'-'+Ñ~S---"'" .-~:¡E/~W"'--;----:'-'-VS-- '-;-.. - -'~ -"'-õ"'LS'. ~ -~-~..ïíd"'---'T~;ri'----'-"-'_u -'TFO----:- """-c-'---'--:- "- -.....-......,.
ff .deg\ deg,. ft . '" . .ft",.ft .'. .. "ft .degltOOft,dêg/.100ft deg/,1QOff deg. ..
- :;'"._i""""-..'.,....,-.....-:.......,.........',,..i_..,...,";,....,_",~"""-"...-,..,',.."....."."..,,,..,.i ,..._.,..,."-_....._-"-",.._..._",,,-.....,;,c:;,,,_::,~"::--_C.'.,,:";",....""",_."",C_.....,C,.",_i......,_:":":.....,,....,..,.,,,;:.L_j-_c";.--,:_-_...".......C"..---",-,."....."':'..".._"_:",,;,,,..."..---'--..-,...."....'.":"",.::."-",,,,,"'- -,_.."..... '.,,-"_""_"" -",....._"..i.""-:..,..:,,,."",
1200.00 17.26 283.74 1188.25 10.62 -120.74 83.54 2.50 2.27 3.76 26.51
1300.00 19.59 286.65 1283.12 18.95 -151.21 109.05 2.50 2.33 2.90 22.91
1400.00 21.95 288.95 1376.62 29.82 -184.95 138.57 2.50 2.36 2.30 20.16
1500.00 24.34 290.83 1468.57 43.22 -221.90 172.07 2.50 2.39 1.87 18.00
1600.00 26.75 292.38 1558.79 59.11 -261,97 209.48 2.50 2.41 1.56 16.28
1700.00 29.17 293.70 1647.11 77.48 -305.10 250.72 2.50 2.42 1.32 14.87
1800.00 31.60 294.83 1733.37 98.28 -351.20 295.71 2.50 2.43 1.13 13.71
1816.27 32,00 295.00 1747.20 101.90 -358.98 303.39 2.50 2.44 1.05 12.87
..-.,........ ".......", ..,,- --'---""""-'--""'"-"-.---..."....._"-,,,..--,,"', """""""...".'.."....-....",....... --.....,..-..,..,--"--.--,,,-..,... ,.."...-......----"--"..-----.....-...--..".-...-..-.."...,,..-,,-..---."..-..""-_..."---~----_."--,_..."--,,.........--.,,...,,,,.. ..-"...---"'.-. ."""""""" "_m,__.,_,'-,',',-""",,,'" ..........
Section 6: Start
'" ,..,. 'c-""":' --"'c'. "'u_- "..." :".-"-'7"'-"" ~"---c' ,.. ".."'..'" ',---'"."..,..-..." ,;-----.._-,--.,-:,..,..."..,..,...,_.,~ ..'-""--...-"'7" ---"'u--",-,-" -:T'-~-" --,-",:-",c-"-,-""",,,"'-'-':-:-"_.""-"-""""CC"""'-'---"'u':"'- '"",,-"""-'-....,.-"" """"""""-'-'-' ,"" .--'c~ "'.-.'-"--""""-'."" ,,":""c'-:-c """-"--"-:'" ceO-:' -:'c-,-"" ..,-, -,-....,'--"""..
" ":..'MD:.':"::."""':..].llc~"::.:.. '.....iÃzi.Il" '..,.'(\11) ..'....'.....:'....+N/-8i..';¡"E/-WiY$i.J)LS<,<Build ...:......."..;."Tnrn.:.:. :'.'. . TFO..'.'.....':,.'.'. ...'" ..;..: .'
ft .;deg . ... d~g "~ii, It. " ,ff ....' ""ft. 'ff..dågI1,OOfttlëg/100ft"deg/1bOft .d~g' .' .
;',., ..",...",..,-,:;"..,:_--_..._"...."."",::",.".:.c..:.""",;,.:"..~-"-",.,...-',,-:.,.,:-.. :"":,-,..,:_.~,_.:,:,..-,-,_.c;.....:..........-.,:.::::,,-,,:,,:,,,..".::."..~","::':'.,.:",~..c"":",--,.._."..;,,::.,~,:",,,-::...,--,'--.c.Lc:.,"~,:""_.~"",:.::""'",..",...~:,::.::..::".c..:;::_,;~,:.:,c:...,,_...,,:::; ..:""",..,..._,~,:,;":..;""_,'.i,.,,,,.....,.....,.:;:._c".:,:,---"".."-"._"""..,...:.._-""..--,.."..":,,,.-i,,.....,
1900.00 32.00 295.00 1818.21 120.65 -399.19 343.12 0.00 0.00 0.00 180.00
2000.00 32.00 295.00 1903.01 143.05 -447.22 390.56 0.00 0.00 0.00 180.00
2055.41 32.00 295.00 1950.00 155.46 -473.83 416.85 0.00 0.00 0.00 180.00
. ,--."""---"-..."....--_..,,_..,..,,...,,-,,,_..,,- "".. -.....--.---"'..., ,.-....,,- -.......-.."-.--,-....."..".,..--.."-..."""...,----.,,,....,.....--...--,,"""-"'--""'---'-""'-.-""--"""'-"--"--""-'-"""""'-"'--"""-'"-"-------"--""--"'--"----""""'...."""'--"""""""""""---"'----........."..--.--------,,-......---"'-"" ..
Section 7: Start
.. -- ". ",,---""'.'.-,,- ,-,-.....,........" "-'c"-."-.""",""""'" ""--"""""'.c ,....."..-..,.....-.."....",..,., """""-'-""--':-' --c"." "-"-...".i':-"-"---"-'--' :--:'-""""""""""'-""--'--"'---.-' ,,-..-..,..--- -----"'~"-'-"._'-----""" --c-:-""""",,--',,-,'c-,-,.---..--"'.". -"-"--,"".c',"" -" ,,----,---"""""". ----,-"".....-...-.....-".-.. ._~.._,.......
'MD Inti.. AZim. . ¡VD. .+NI-S +E/.,W:. .VS .. ... ..,1)1.;8 .'Bllild ..TIJrn. .' TFO> , : " '. .
ft deg. . deg . ..ft "..fl "...'.';...ft"./'f(:degI100ff!degI100ftøëgl1.o0ffdeg
"......".....,.....,..",~.,....,.._....-'--c....:"...c...__,..L_~'..::~_:...~:_~";~:C'..-'--...."',_C,.....:...~--"':"_'_._..........,...c.,...,--'-'-'-,,,,'---'--.,,',:.:.'--"::"'_".."~,L..c,,..:'.....':':--_..::-..,Ci,"::'.,-..:__....:,.....:,c:...;,~_,:",...,-;--~...":"",::"":::_c_,-,,_:.."__,,~_':"',:,_......,.".._,:~,,,C_'_:,,:.._C-",_-~,'.".._".c.----c...- ,:.- "'--..,-,,'~:._" ...--_......, .---..-
2100.00 33.14 297.55 1987.58 166.09 -495.34 438.57 4.00 2.55 5.73 51.47
2200.00 35.86 302.73 2070.00 194.58 -544.23 491.32 4.00 2.72 5.18 49.32
2300.00 38.77 307.26 2149.54 229.39 -593.82 549.44 4.00 2.92 4.52 45.05
2400.00 41.84 311.22 2225.80 270.34 -643.85 612.65 4.00 3.07 3.97 41.45
2500.00 45.03 314.74 2298.42 317.24 -694.08 680.63 4.00 3.19 3.51 38.42
2600.00 48.32 317.87 2367.03 369.86 -744.28 753.06 4.00 3.29 3.14 35.87
2700.00 51.68 320.70 2431.31 427.94 -794.19 829.59 4.00 3.36 2.83 33.71
2800.00 55.11 323.28 2490.93 491.19 -843.58 909.84 4.00 3.42 2.58 31.90
2824.76 55.96 323.88 2504.95 507.62 -855.69 930.23 3.99 3.45 2.43 30.33
...- .........-........-......,-.,-....., ...."--"..,,,-_.., "'---""-"-'..-"-"-----"------,,-'_--_...m_...........--..---....._u_----.._--,,-------_..._---,,-_._.._-_._,------,,_..........,,--...._---_..,,-_.----..-.,,-.............,,--.--.-.........-........--........ .... ".. """-""- ...- ,..---..-.....,...-"-,, ,
Section 8: Start
.. ." """,,--..'--"" -" ,.....'....,_..,,' ",,-...,..... --""'-" ....---".,.....,.............-......-.,.-..----........----...",.....-...---,.. "'....--- "-" "'-..""""-"-"'- '..,-"-..."-"'."'--"""""'..-""""',,"""'-"""-""-'-"-""-:- ,-------,-,...,.."...,.-..-..,....""...---,-..-....-"....-.......-"-...--....,.---.. --,," """'-",,'."'-"'."".-""""" "",".""'."'-'-"-."'" ,..."."
MD Incl Azim TVD +NI-S +E/-W VS . DLS . Build. Turn TFO
ft deg. deg ft ft. ft. ftdegl100ftdegl100ftdeg/1OOO deg
....-........."--.""......-..,..,..-.......--......--..,,"...,,...--,....--....-,,_...._....'...--,-- ....""'-,--" ...,-,..-......------....-......-.,..,...-....--......,-..."............,.,..,..................,..-......"...-.--,--"..-....",.......-.....--..-..""..-.......-..",---....--,..,--........,......-.....,".....----.-......-.---..,...",...-. "'.'."""-"".""'"-'" ......--,,_.., ..-..............-".""-"""'" ...,
2900.00 55.96 323.88 2547.07 557.98 -892.44 992.52 0.00 0.00 0.00 0.00
3000.00 55.96 323.88 2603.04 624.92 -941.29 1075.31 0.00 0.00 0.00 0.00
3100.00 55.96 323.88 2659.02 691.86 -990.14 1158.10 0.00 0.00 0.00 0.00
3200.00 55.96 323.88 2715.00 758.79 -1038.98 1240.89 0.00 0.00 0.00 0.00
""".........--_n_._..__..-..--"...-...,--........,-........-...-..,..---...--.... --..,..... ""-"-".--,--.".,--"""".....-___.--.m.._.._.....-.", ".-"..--- ..,'. -.. -........."..,...----..--.".--..-......-,.."...."...-""""-,,-,,-,,, ,. "'-""""""""-'-""""""""-""-' ",,---'-----"--'-'-"",,""---'."--'-'.."'--""""'-""""'" .... -- .......-. ----"
( (
BP Amoco
Planning Report - Geographic
..-.. - - --- ---
------ -- -- - - -
- - -- - --------
Company: BP Amoco Date: 8/112001 Time: 09:41 :58 Page: 3
-- Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: E-104, True North
Site: PB E Pad Vertical (TVD) Reference: 62' 62.0
Well: E-1O4 Section (VS) Reference: Well (0.00N,O.00E,321.45Azi) .
. WeUpatb: Plan E-104 Plan: E-104 wpO1 .
,-- --_m--_- -------- ------------------- ---_U------"--___--__h ----- ---------------..---------------------....----------- -------------------- ----------------------------------- ----------;
Section 8: Start
--.----------- ---- --n__----__------------------------------ - ----- ---- -------------..--------------------------------------- ------------------------------------
I MD Incl Azim TVD +N/-S +E/-W VS DLS Build Turn TFO
I ft deg deg ft ft ft ft deg/10Oft deg/10Oft deg/10Oft deg
f . -- --- -.._--.....--------------- --- --------------------------------..--------------------------------------------- ----------- ----_.._- --- -..------ --------- ----- ---- ------- - ------------------ _. --------
i 3300.00 55.96 323.88 2770.98 825.73 -1087.83 1323.68 0.00 0.00 0.00 0.00
,3400.00 55.96 323.88 2826.95 892.67 -1136.68 1406.47 0.00 0.00 0.00 0.00
i 3500.00 55.96 323.88 2882.93 959.60 -1185.52 1489.27 0.00 0.00 0.00 0.00
3600.00 55.96 323.88 2938.91 1026.54 -1234.37 1572.06 0.00 0.00 0.00 0.00
3700.00 55.96 323.88 2994.88 1093.48 -1283.22 1654.85 0.00 0.00 0.00 0.00
3800.00 55.96 323.88 3050.86 1160.41 -1332.06 1737.64 0.00 0.00 0.00 0.00
3900.00 55.96 323.88 3106.84 1227.35 -1380.91 1820.43 0.00 0.00 0.00 0.00
4000.00 55.96 323.88 3162.82 1294.29 -1429.76 1903.22 0.00 0.00 0.00 0.00
4100.00 55.96 323.88 3218.79 1361.22 -1478.61 1986.01 0.00 0.00 0.00 0.00
4200.00 55.96 323.88 3274.77 1428.16 -1527.45 2068.80 0.00 0.00 0.00 0.00
4300.00 55.96 323.88 3330.75 1495.10 -1576.30 2151.59 0.00 0.00 0.00 0.00
4400.00 55.96 323.88 3386.72 1562.04 -1625.15 2234.38 0.00 0.00 0.00 0.00
4500.00 55.96 323.88 3442.70 1628.97 -1673.99 2317.17 0.00 0.00 0.00 0.00
4600.00 55.96 323.88 3498.68 1695.91 -1722.84 2399.96 0.00 0.00 0.00 0.00
4700.00 55.96 323.88 3554.66 1762.85 -1771.69 2482.75 0.00 0.00 0.00 0.00
4800.00 55.96 323.88 3610.63 1829.78 -1820.53 2565.54 0.00 0.00 0.00 0.00
4900.00 55.96 323.88 3666.61 1896.72 -1869.38 2648.33 0.00 0.00 0.00 0.00
5000.00 55.96 323.88 3722.59 1963.66 -1918.23 2731.12 0.00 0.00 0.00 0.00
5100.00 55.96 323.88 3778.56 2030.59 -1967.08 2813.91 0.00 0.00 0.00 0.00
5200.00 55.96 323.88 3834.54 2097.53 -2015.92 2896.70 0.00 0.00 0.00 0.00
5300.00 55.96 323.88 3890.52 2164.47 -2064.77 2979.49 0.00 0.00 0.00 0.00
5400.00 55.96 323.88 3946.50 2231.40 -2113.62 3062.28 0.00 0.00 0.00 0.00
5500.00 55.96 323.88 4002.47 2298.34 -2162.46 3145.07 0.00 0.00 0.00 0.00
5600.00 55.96 323.88 4058.45 2365.28 -2211.31 3227.86 0.00 0.00 0.00 0.00
5700.00 55.96 323.88 4114.43 2432.21 -2260.16 3310.65 0.00 0.00 0.00 0.00
5800.00 55.96 323.88 4170.40 2499.15 -2309.00 3393.45 0.00 0.00 0.00 0.00
5900.00 55.96 323.88 4226.38 2566.09 -2357.85 3476.24 0.00 0.00 0.00 0.00
6000.00 55.96 323.88 4282.36 2633.02 -2406.70 3559.03 0.00 0.00 0.00 0.00
6100.00 55.96 323.88 4338.34 2699.96 -2455.54 3641.82 0.00 0.00 0.00 0.00
6200.00 55.96 323.88 4394.31 2766.90 -2504.39 3724.61 0.00 0.00 0.00 0.00
6300.00 55.96 323.88 4450.29 2833.83 -2553.24 3807.40 0.00 0.00 0.00 0.00
6400.00 55.96 323.88 4506.27 2900.77 -2602.09 3890.19 0.00 0.00 0.00 0.00
6500.00 55.96 323.88 4562.24 2967.71 -2650.93 3972.98 0.00 0.00 0.00 0.00
6600.00 55.96 323.88 4618.22 3034.64 -2699.78 4055.77 0.00 0.00 0.00 0.00
6700.00 55.96 323.88 4674.20 3101.58 -2748.63 4138.56 0.00 0.00 0.00 0.00
6800.00 55.96 323.88 4730.18 3168.52 -2797.47 4221.35 0.00 0.00 0.00 0.00
6900.00 55.96 323.88 4786.15 3235.45 -2846.32 4304.14 0.00 0.00 0.00 0.00
7000.00 55.96 323.88 4842.13 3302.39 -2895.17 4386.93 0.00 0.00 0.00 0.00
7100.00 55.96 323.88 4898.11 3369.33 -2944.01 4469.72 0.00 0.00 0.00 0.00
7200.00 55.96 323.88 4954.08 3436.27 -2992.86 4552.51 0.00 0.00 0.00 0.00
7300.00 55.96 323.88 5010.06 3503.20 -3041.71 4635.30 0.00 0.00 0.00 0.00
7400.00 55.96 323.88 5066.04 3570.14 -3090.56 4718.09 0.00 0.00 0.00 0.00
7500.00 55.96 323.88 5122.02 3637.08 -3139.40 4800.88 0.00 0.00 0.00 0.00
7600.00 55.96 323.88 5177.99 3704.01 -3188.25 4883.67 0.00 0.00 0.00 0.00
7700.00 55.96 323.88 5233.97 3770.95 -3237.10 4966.46 0.00 0.00 0.00 0.00
7800.00 55.96 323.88 5289.95 3837.89 -3285.94 5049.25 0.00 0.00 0.00 0.00
7900.00 55.96 323.88 5345.92 3904.82 -3334.79 5132.04 0.00 0.00 0.00 0.00
8000.00 55.96 323.88 5401.90 3971.76 -3383.64 5214.83 0.00 0.00 0.00 0.00
8100.00 55.96 323.88 5457.88 4038.70 -3432.48 5297.62 0.00 0.00 0.00 0.00
8200.00 55.96 323.88 5513.86 4105.63 -3481.33 5380.42 0.00 0.00 0.00 0.00
8300.00 55.96 323.88 5569.83 4172.57 -3530.18 5463.21 0.00 0.00 0.00 0.00
8400.00 55.96 323.88 5625.81 4239.51 -3579.02 5546.00 0.00 0.00 0.00 0.00
8500.00 55.96 323.88 5681.79 4306.44 -3627.87 5628.79 0.00 0.00 0.00 0.00
8600.00 55.96 323.88 5737.77 4373.38 -3676.72 5711.58 0.00 0.00 0.00 0.00
8700.00 55.96 323.88 5793.74 4440.32 -3725.57 5794.37 0.00 0.00 0.00 0.00
8800.00 55.96 323.88 5849.72 4507.25 -3774.41 5877.16 0.00 0.00 0.00 0.00
8900.00 55.96 323.88 5905.70 4574.19 -3823.26 5959.95 0.00 0.00 0.00 0.00
9000.00 55.96 323.88 5961.67 4641.13 -3872.11 6042.74 0.00 0.00 0.00 0.00
9100.00 55.96 323.88 6017.65 4708.06 -3920.95 6125.53 0.00 0.00 0.00 0.00
9200.00 55.96 323.88 6073.63 4775.00 -3969.80 6208.32 0.00 0.00 0.00 0.00
9300.00 55.96 323.88 6129.61 4841.94 -4018.65 6291.11 0.00 0.00 0.00 0.00
9400.00 55.96 323.88 6185.58 4908.87 -4067.49 6373.90 0.00 0.00 0.00 0.00
9500.00 55.96 323.88 6241.56 4975.81 -4116.34 6456.69 0.00 0.00 0.00 0.00
9600.00 55.96 323.88 6297.54 5042.75 -4165.19 6539.48 0.00 0.00 0.00 0.00
____m_--...--..----
---------- _.---."----."..,-------------.------.------.---- -------------------------_--_--..--n_------.._---------..----------------..-..------- --
..--..----..-----..-.-----------------------.------------.---------------.--------- ------ --..---------------------------------.-------..---.... ----..--..--------.------ ----------..----
-----.----
( ('
BP Amoco
Planning Report - Geographic
. Company: BP Amoco Date: 8/1/2001 Time: 09:41 :58 Page: 4
I Field: Prudhoe Bay C€H>rdinate(NE) Reference: Well: E-104, True North
I Site: PB E Pad Vertical (fVD) Reference: 62' 62.0
" Well: E-104 Section (VS) Reference: Well (0.00N,O.00E.321.45Azi)
¡ Wellpath: Plan E-104 Plan: E-104 wp01 I
,-,.... -.. ---- "-u_,-...------,----,---.,.-----.. ,_,___n- --, -,...--- "'-.'--_____n...- _n__"._--,--------, , .'-n-____--' - --'.-'------'--""'-"-----'---------------------- ------------.--------.-----1
Section 8: Start
------'-MD--------i~~i--'.'---~i':';------'-TVD-"---+ÑI-Š---.--+E/-W ------ VS"'------ DLS.-Boild ---Tor~--.- TFO------------"--.--------¡
. ft deg deg ft ft ft ft deg/100ft deg/10Oft deg/10Oft deg i
c.',- ---- "----,._------,,- ','-'_.__._,_."--_.'----------- u.'-----...-----.--____n______----.______n_- -----------__._n-- ------,. --------.._---- -.--.¡
i ~~~~:~~ ~~:~~ ~~~:~~ ~~~~:~~ ~~ ~~:~~ ~~~~:~ ~~~;:~~ ~:~~ ~:~~ ~:~~ ~:~~ I
I 9900.00 55.96 323.88 6465.47 5243.56 -4311_73 6787.85 0_00 0_00 0_00 0_00
10000.00 55.96 323.88 6521.45 5310.50 -4360.58 6870.64 0.00 0.00 0.00 0.00
10100.00 55.96 323.88 6577.42 5377.43 -4409.42 6953.43 0.00 0.00 0.00 0.00
10200.00 55.96 323.88 6633.40 5444.37 -4458.27 7036.22 0.00 0.00 0.00 0.00
10300.00 55.96 323.88 6689.38 5511.31 -4507.12 7119.01 0.00 0.00 0.00 0.00
10400.00 55.96 323.88 6745.35 5578.24 -4555.96 7201.80 0.00 0.00 0.00 0.00
10500.00 55.96 323.88 6801.33 5645.18 -4604.81 7284.59 0.00 0.00 0.00 0.00
10600.00 55.96 323.88 6857.31 5712.12 -4653.66 7367.39 0.00 0.00 0.00 0.00
10700.00 55.96 323.88 6913.29 5779.05 -4702.50 7450.18 0.00 0.00 0.00 0.00
10800.00 55.96 323.88 6969.26 5845.99 -4751.35 7532.97 0.00 0.00 0.00 0.00
10900.00 55.96 323.88 7025.24 5912.93 -4800.20 7615.76 0.00 0.00 0.00 0.00
11000.00 55.96 323.88 7081.22 5979.86 -4849.05 7698.55 0.00 0.00 0.00 0.00
11100.00 55.96 323.88 7137.19 6046.80 -4897.89 7781.34 0.00 0.00 0.00 0.00
11200.00 55.96 323.88 7193.17 6113.74 -4946.74 7864.13 0.00 0.00 0.00 0.00
11300.00 55.96 323.88 7249.15 6180.67 -4995.59 7946.92 0.00 0.00 0.00 0.00
11400.00 55.96 323.88 7305.13 6247.61 -5044.43 8029.71 0.00 0.00 0.00 0.00
11500.00 55.96 323.88 7361.10 6314.55 -5093.28 8112.50 0.00 0.00 0.00 0.00
11600.00 55.96 323.88 7417.08 6381.48 -5142.13 8195.29 0.00 0.00 0.00 0.00
11700.00 55.96 323.88 7473.06 6448.42 -5190.97 8278.08 0.00 0.00 0.00 0.00
11800.00 55.96 323.88 7529.03 6515.36 -5239.82 8360.87 0.00 0.00 0.00 0.00
11900.00 55.96 323.88 7585.01 6582.29 -5288.67 8443.66 0.00 0.00 0.00 0.00
12000.00 55.96 323.88 7640.99 6649.23 -5337.51 8526.45 0.00 0.00 0.00 0.00
12100.00 55.96 323.88 7696.97 6716.17 -5386.36 8609.24 0.00 0.00 0_00 0.00
12200.00 55.96 323.88 7752.94 6783.10 -5435.21 8692.03 0.00 0.00 0.00 0.00
12300.00 55.96 323.88 7808.92 6850.04 -5484.06 8774.82 0.00 0.00 0.00 0.00
12400.00 55.96 323.88 7864.90 6916.98 -5532.90 8857.61 0.00 0.00 0.00 0.00
12500.00 55.96 323.88 7920.87 6983.91 -5581.75 8940.40 0.00 0.00 0.00 0.00
12600.00 55.96 323.88 7976.85 7050.85 -5630.60 9023.19 0.00 0.00 0.00 0.00
12700.00 55.96 323.88 8032.83 7117.79 -5679.44 9105.98 0.00 0.00 0.00 0.00
12736.48 55.96 323.88 8053.00 7142.62 -5696.96 9136.32 0.00 0.00 0.00 0.00
,. '---'.".'......-._--_.."._-'..-'-_.__.._,- ".,...-'.""'---,'- -....-..,...--,.....,-".-.-..,....."..-.-..,......--,,-,---..--.--,-----',._-,.-,,---,---------"_""""-,-n_-_..-"-"-'-'._--".' "..- ,---- .-._.,-,.,,-'-'-"-- .-......-.-..".-'-.- .,.
Section 9: Start
'. ..-."', ":-"'~_.'--"._'-,'7'-' '~"'--:"'7..."'~ ~ ...:- __n'..,...:._..,---,.--""..""--,,,"-"" c'-'.' ~..., .__._'n_.___,.,.-:""....--..,,-...- ,..,..- "~~"-'.'-'-"""':::-'~-¡-""'-_-:ï,:..n.: "'._""-",-:-:'.7~""'~"""-----'-'-.=---~-7-'-:-"'-'--"""":" ',,-- ;-"'c:-~'r:.."""". '-'. "'."'-"-:--",...""'."....' -"" .c' ',--
MB" .... Jnçl Azim TVD. +N/:-S',.. +E/..W) .."YS..... "DLS. "..¡Ouild..".Turo' .'TFO. . ,
ft." .. d~g .. deg" .. it, ..,' ft: ft .,.ft .âe9/100f(,d~gI100ftdegI1pOftdåg ..
.."..,.........,.._..--c_"".-,,---,..._-~,",~_.:-,..'....c:.,_.--~:,.-':":'--",'_.....,_..'-""."_.......,.c.,.."......" .,........-,...., ..,_.,......, _"""""':..."'."'--"'..,...",.~,~....,..._,..,.:..."..,...~--,-,-"""""" c.J_c":,.._,...,,......_-,~-,-,-,:~._,,_....,.,'..:--.."..:,c_.;,..,..._:,.."-,.":'.'.,,....,':"...:~-,........:_:..........,...,,-.,.,:..'",c....,:,...~,.."""..,..., "'.'-".""."""""'."'." ,......,.,..."...-.....
12800.00 55.96 323.88 8088.56 7185.14 -5727.99 9188.91 0.00 0.00 0.00 0.00
12886.48 55.96 323.88 8136.96 7243.04 -5770.23 9260.52 0.00 0.00 0.00 0.00
"---.'-""--."'.""--"."..."'."...-.--..,.............-.....'-...-.....".......-...,..-..,.....-...-..,.,..----,.-.......-...,........ .
. ".-"-"---."-.'.."""-"'."'-..""-..."--'.-."---""'-.....,..,-..-....-.---.......-..,......."----..".,-....,-.,......'--"""'.".-.-..,....,-.."--.""'." ,
Survey
~~~~~~~~~~~~~~~~~r~~~~~-~~~f~~~~~~-~i~~~~~'"
MD Ipcl .. Azi...TVD~N/-S.' .+E/~W' N(jrthing..~..~t~ng .. ... Deg MiD Sec . ..D~g,1\:1;~"~Sec'
:.., :,. .,:...~, '_C~_L--" ... -- ".- ,--~~,~-~~~--,--::...,~-~.~_.. ,.,........:::......,"-c:~~._,,-_. " ._...c, ..:. ._-~~:~,.,_.:.., "..._._n:~!::~,_~l_c _n'.. ,~;.--,~,~.~~_.cJ~_.~.:~~.~.L_~L,._~...J:~" .,:. :.., .~..:,..",....,.."::,,,.,._.., --~~:~-"..,_.,_":,i_,_,_:.',-",,-~-,,, ,-_...~
62.00 0.00 0.00 62.00 0.00 0.00 5976673.00 664450.00 70 20 33.260 N 148 39 55.012 W
100.00 0.00 0.00 100.00 0.00 0.00 5976673.00 664450.00 70 20 33.260 N 148 39 55.012 W
200.00 0.00 0.00 200.00 0.00 0.00 5976673.00 664450.00 70 20 33.260 N 148 39 55.012 W
300.00 0.00 0.00 300.00 0.00 0.00 5976673.00 664450.00 70 20 33.260 N 148 39 55.012 W
400.00 1.50 270.00 399.99 0.00 -1.31 5976672.97 664448.69 70 20 33.260 N 148 39 55.050 W
500.00 3.00 270.00 499.91 0.00 -5.23 5976672.89 664444.77 70 20 33.260 N 148 39 55.164 W
600.00 4.50 270.00 599.69 0.00 -11.77 5976672.74 664438.23 70 20 33.260 N 148 39 55.356 W
633.33 5.00 270.00 632.91 0.00 -14.54 5976672.68 664435.46 70 20 33.260 N 148 39 55.436 W
700.00 6.33 270.00 699.25 0.00 -21.12 5976672.54 664428.88 70 20 33.260 N 148 39 55.629 W
800.00 8.33 270.00 798.43 0.00 -33.89 5976672.26 664416.12 70 20 33.260 N 148 39 56.001 W
883.33 10.00 270.00 880.69 0.00 -47.16 5976671.97 664402.85 70 20 33.260 N 148 39 56.389 W
900.00 10.37 271.10 897.10 0.03 -50.11 5976671.93 664399.91 70 20 33.260 N 148 39 56.4 75 W
1000.00 12.64 276.34 995.08 1.41 -69.98 5976672.87 664380.01 70 20 33.273 N 148 39 57.056 W
1100.55 15.00 280.00 1092.72 4.88 -93.73 5976675.82 664356.19 70 20 33.308 N 148 39 57.750 W
1200.00 17.26 283.74 1188.25 10.62 -120.74 5976680.97 664329.06 70 20 33.364 N 148 39 58.539 W
1300.00 19.59 286.65 1283.12 18.95 -151.21 5976688.62 664298.42 70 20 33.446 N 148 39 59.429 W
.,........---....--...--..-.......-- "-'.-'..-.-.........--.' ........"..---"..--,-,.........,..- "."."'_._00_.._" "."-'.-"""-"--"...--"..'.".----'."----"'-""."""'--'----."'..__'00._.--__-,.........."-'.'.-"".."'."'.'.-.-. ..-.,.,...-.".,.........,...."-".'_.'00"'...-"." .-.".
____m____.-----...-..--'----------
( BP Amoco (
Planning Report - Geographic
.....----------------------------------- ---.., "-------------...-...- ---
Company: BP Amoco Date: 8/1/2001 Time: 09:41:58 Page: 5
Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: E-104, True North
, Site: PB E Pad Vertical (I'VD) Reference: 62' 62.0
, Well: E-1O4 Section (VS) Reference: Well (0.00N,O.00E,321.45Azi) I
- ~~~~~-~~_.~~an__~~ ~-~--_... -------...--- - --,-'- - __n ------ - ----- ---------""------ --_..!~~- -----------. -_--____E-1_~..!p-~!_--_.._- ------------..-....-..--- ---_..- -----------..._!
Survey
---------- M~-----~::-----'--~im ----~~-- +N/-S +E1-W N:~n~---E:::------;:: ~~~itu: ~ -~ ~~git~:~~-l
: ft deg deg ft ft ft ft ft I
~- -140Õ-~Õ-O'---21~95-----288.95-'-'--1376:62-------29.82----- ~1-ã4~95--'-5-9-7669â~7š-------664264~45----70. --iÕ---335S3"'Ñ----"148 --4Õ------O~41'5- \N--¡
1500.00 24.34 290.83 1468.57 43.22 -221.90 5976711.34 664227.23 70 20 33.685 N 148 40 1.494 W :
1600.00 26.75 292.38 1558.79 59.11 -261.97 5976726.35 664186.82 70 20 33.841 N 148 40 2.665 W
1700.00 29.17 293.70 1647.11 77.48 -305.10 5976743.76 664143.30 70 20 34.022 N 148 40 3.925 W
1800.00
1816.27
1900.00
2000.00
2055.41
2100.00
2200.00
2300.00
2400.00
2500.00
2600.00
2700.00
2800.00
2824.76
2900.00
3000.00
3100.00
3200.00
3300.00
3400.00
3500.00
3600.00
3700.00
3800.00
3900.00
4000.00
4100.00
4200.00
4300.00
4400.00
4500.00
4600.00
4700.00
4800.00
4900.00
5000.00
5100.00
5200.00
5300.00
5400.00
5500.00
5600.00
5700.00
5800.00
5900.00
6000.00
6100.00
6200.00
6300.00
31.60
32.00
32.00
32.00
32.00
33.14
35.86
38.77
41.84
45.03
48.32
51.68
55.11
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
294.83
295.00
295.00
295.00
295.00
297.55
302.73
307.26
311.22
314.74
317.87
320.70
323.28
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
1733.37
1747.20
1818.21
1903.01
1950.00
1987.58
2070.00
2149.54
2225.80
2298.42
2367.03
2431.31
2490.93
2504.95
2547.07
2603.04
2659.02
2715.00
2770.98
2826.95
2882.93
2938.91
2994.88
3050.86
3106.84
3162.82
3218.79
3274.77
3330.75
3386.72
3442.70
3498.68
3554.66
3610.63
3666.61
3722.59
3778.56
3834.54
3890.52
3946.50
4002.47
4058.45
4114.43
4170.40
4226.38
4282.36
4338.34
4394.31
4450.29
98.28
101.90
120.65
143.05
155.46
166.09
194.58
229.39
270.34
317.24
-351.20 5976763.55
-358.98 5976766.99
-399.19 5976784.86
-447.22 5976806.19
-473.83 5976818.02
-495.34 5976828.17
-544.23 5976855.59
-593.82 5976889.29
-643.85 5976929.14
-694.08 5976974.92
664096.75
664088.90
664048.28
663999.78
663972.91
663951.17
663901.67
663851.34
663800.42
663749.17
663697.84
663646.67
663595.91
663583.44
663545.59
663495.29
663444.99
663394.69
663344.39
663294.09
663243.79
663193.49
663143.19
663092.89
663042.59
662992.29
662941.99
662891.69
662841.39
662791.09
662740.79
662690.49
662640.19
662589.89
662539.59
662489.29
662438.99
662388.69
662338.39
662288.09
662237.79
662187.49
662137.19
662086.89
662036.59
661986.29
661935.99
661885.69
661835.39
70 20 34.226 N 148 40
70 20 34.262 N 148 40
70 20 34.446 N 148 40
70 20 34.666 N 148 40
70 20 34.788 N 148 40
5.271 W
5.499 W
6.674 W
8.077 W
8.854 W
369.86
427.94
491.19
507.62
557.98
-744.28 5977026.42
-794.19 5977083.38
-843.58 5977145.54
-855.69 5977161.69
-892.44 5977211.23
70 20 34.893 N 148 40 9.483 W
70 20 35.173 N 148 40 10.911 W
70 20 35.515 N 148 40 12.360 W
70 20 35.918 N 148 40 13.821 W
70 20 36.379 N 148 40 15.289 W
70 20 36.897 N 148 40 16.756 W
70 20 37.468 N 148 40 18.214 W
70 20 38.090 N 148 40 19.657 W
70 20 38.252 N 148 40 20.011 W
70 20 38.747 N 148 40 21.085 W
70 20 39.405 N 148 40 22.512 W
70 20 40.063 N 148 40 23.940 W
70 20 40.722 N 148 40 25.367 W
70 20 41.380 N 148 40 26.794 W
70 20 42.038 N 148 40 28.222 W
70 20 42.696 N 148 40 29.649 W
70 20 43.355 N 148 40 31.077 W
70 20 44.013 N 148 40 32.504 W
70 20 44.671 N 148 40 33.932 W
70 20 45.329 N 148 40 35.360 W
70 20 45.987 N 148 40 36.787 W
70 20 46.646 N 148 40 38.215 W
70 20 47.304 N 148 40 39.642 W
70 20 47.962 N 148 40 41.070 W
70 20 48.620 N 148 40 42.498 W
70 20 49.279 N 148 40 43.926 W
70 20 49.937 N 148 40 45.353 W
70 20 50.595 N 148 40 46.781 W
70 20 51.253 N 148 40 48.209 W
70 20 51.911 N 148 40 49.637 W
70 20 52.570 N 148 40 51.065 W
70 20 53.228 N 148 40 52.492 W
70 20 53.886 N 148 40 53.920 W
70 20 54.544 N 148 40 55.348 W
70 20 55.202 N 148 40 56.776 W
70 20 55.860 N 148 40 58.204 W
70 20 56.519 N 148 40 59.632 W
70 20 57.177 N 148 41 1.060 W
70 20 57.835 N 148 41 2.488 W
70 20 58.493 N 148 41 3.916 W
70 20 59.151 N 148 41
70 20 59.810 N 148 41
70 21 0.468 N 148 41
70 21 1.126 N 148 41
5.345 W
6.773 W
8.201 W
9.629 W
624.92 -941.29 5977277.08
691.86 -990.14 5977342.92
758.79 -1038.98 5977408.77
825.73 -1087.83 5977474.61
892.67 -1136.68 5977540.46
959.60 -1185.52 5977606.30
1026.54 -1234.37 5977672.15
1093.48 -1283.22 5977737.99
1160.41 -1332.06 5977803.84
1227.35 -1380.91 5977869.68
1294.29 -1429.76
1361.22 -1478.61
1428.16 -1527.45
1495.10 -1576.30
1562.04 -1625.15
5977935.52
5978001.37
5978067.21
5978133.06
5978198.90
. -- -- ----,-------"----------------",,,,----,-,"--"-'----'--"'--'--"- -__----_.n_------' ----------__._....m___----"'------------- - -..-------------,---,---.----------------..----..---..-------------,_._-- ,---,-'-- _____nn__---'--'---
1628.97 -1673.99 5978264.75
1695.91 -1722.84 5978330.59
1762.85 -1771.69 5978396.44
1829.78 -1820.53 5978462.28
1896.72 -1869.38 5978528.13
1963.66 -1918.23 5978593.97
2030.59 -1967.08 5978659.82
2097.53 -2015.92 5978725.66
2164.47 -2064.77 5978791.50
2231.40 -2113.62 5978857.35
2298.34 -2162.46 5978923.19
2365.28 -2211.31 5978989.04
2432.21 -2260.16 5979054.88
2499.15 -2309.00 5979120.73
2566.09 -2357.85 5979186.57
2633.02 -2406.70
2699.96 -2455.54
2766.90 -2504.39
2833.83 -2553.24
5979252.42
5979318.26
5979384.11
5979449.95
( BP Amoco (
Planning Report - Geographic
, ""--"""'."--"'---"--'--"--"----'-'-"- _... - ..-.-- --......--...... ...-..-- .-.......-.............-,
Company: BP Amoco Date: 8/1/2001 Time: 09:41 :58 Page: 6 I
: Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: E-1O4, True North i
Site: PB E Pad Vertical (fVD) Reference: 62' 62.0
, Well: E-1O4 Section (VS) Reference: Well (0.00N,O.00E.321.45Azi)
I WeUpatb: Plan E-1O4 Plan: E-1O4 wp01 !
.. -.. ..- -- -'-... '-"-'-.'- -------..---.--. --._u...--...- -".'.-..-.-....-.-.-..-------------.--.-........--...--.---.."-.'-------.-....---.-.'..'--'-.-.--'---------'----'-'-"'-""'."----.--.-.--.-.--.----...--.-..."-- -.... .-........!
Survey
~_.._-_._---------_._-_._._--.__.._.._--_._--------_._._- M~p---------Map--'-' ~-.::..- Latitud~---=:;- <--L~ngit;;d;-=;-'l
! MD Incl Azim TVD +N/-S +E/-W Northing Easting Deg Min See Deg Min See :
I
~..._--_......!!.... ...--..--...-- d~_._.- ---_'_'~~h_- ---_.._._-_!!_..__._---_._._._..~-_... ---. ._---~_._-_._....._-~._----_.--.-!!_--_._..__._.__.__._.._--'---"-""--"----.------"-'_'___h..._._.'-----... .... J
: 6400.00 55.96 323.88 4506.27 2900.77 -2602.09 5979515.79 661785.09 70 21 1.784 N 148 41 11.057 W ¡
i I
I
6500.00
6600.00
6700.00
6800.00
6900.00
7000.00
7100.00
7200.00
7300.00
7400.00
7500.00
7600.00
7700.00
7800.00
7900.00
8000.00
8100.00
8200.00
8300.00
8400.00
8500.00
8600.00
8700.00
8800.00
8900.00
9000.00
9100.00
9200.00
9300.00
9400.00
9500.00
9600.00
9700.00
9800.00
9900.00
10000.00
10100.00
10200.00
10300.00
10400.00
10500.00
10600.00
10700.00
10800.00
10900.00
11000.00
11100.00
11200.00
11300.00
11400.00
11500.00
....
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
55.96
'......
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
323.88
4562.24
4618.22
4674.20
4730.18
4786.15
4842.13
4898.11
4954.08
5010.06
5066.04
5122.02
5177.99
5233.97
5289.95
5345.92
5401.90
5457.88
5513.86
5569.83
5625.81
5681.79
5737.77
5793.74
5849.72
5905.70
5961.67
6017.65
6073.63
6129.61
6185.58
6241.56
6297.54
6353.51
6409.49
6465.47
6521.45
6577.42
6633.40
6689.38
6745.35
6801.33
6857.31
6913.29
6969.26
7025.24
7081.22
7137.19
7193.17
7249.15
7305.13
7361.10
2967.71 -2650.93 5979581.64
3034.64 -2699.78 5979647.48
3101.58 -2748.63 5979713.33
3168.52 -2797.47 5979779.17
3235.45 -2846.32 5979845.02
3302.39 -2895.17 5979910.86
3369.33 -2944.01 5979976.71
3436.27 -2992.86 5980042.55
3503.20 -3041.71 5980108.40
3570.14 -3090.56 5980174.24
3637.08 -3139.40
3704.01 -3188.25
3770.95 -3237.10
3837.89 -3285.94
3904.82 -3334.79
5980240.08
5980305.93
5980371.77
5980437.62
5980503.46
661734.79
661684.49
661634.19
661583.89
661533.59
661483.29
661432.99
661382.69
661332.39
661282.09
661231.79
661181.49
661131.19
661080.89
661030.59
660980.29
660929.99
660879.69
660829.39
660779.09
660728.79
660678.49
660628.19
660577.89
660527.59
660477.29
660426.99
660376.69
660326.39
660276.09
660225.79
660175.49
660125.19
660074.89
660024.59
659974.29
659923.99
659873.69
659823.39
659773.09
659722.79
659672.49
659622.19
659571.89
659521.59
659471.29
659420.99
659370.69
659320.39
659270.09
659219.79
70 21
70 21
70 21
70 21
70 21
70 21
70 21
70 21
70 21
70 21
2.442 N 148 41 12.485 W
3.100 N 148 41 13.914 W
3.758 N 148 41 15.342 W
4.417 N 148 41 16.770 W
5.075 N 148 41 18.199 W
5.733 N 148 41 19.627 W
6.391 N 148 41 21.055 W
7.049 N 148 41 22.484 W
7.707 N 148 41 23.912 W
8.365 N 148 41 25.341 W
3971.76 -3383.64 5980569.31
4038.70 -3432.48 5980635.15
4105.63 -3481.33 5980701.00
4172.57 -3530.18 5980766.84
4239.51 -3579.02 5980832.69
4306.44 -3627.87 5980898.53
4373.38 -3676.72 5980964.38
4440.32 -3725.57 5981030.22
4507.25 -3774.41 5981096.06
4574.19 -3823.26 5981161.91
4641.13 -3872.11 5981227.75
4708.06 -3920.95 5981293.60
4775.00 -3969.80 5981359.44
4841.94 -4018.65 5981425.29
4908.87 -4067.49 5981491.13
4975.81 -4116.34 5981556.98
5042.75 -4165.19 5981622.82
5109.68 -4214.04 5981688.67
5176.62 -4262.88 5981754.51
5243.56 -4311.73 5981820.35
5310.50 -4360.58 5981886.20
5377.43 -4409.42 5981952.04
5444.37 -4458.27 5982017.89
5511.31 -4507.12 5982083.73
5578.24 -4555.96 5982149.58
5645.18 -4604.81 5982215.42
5712.12 -4653.66 5982281.27
5779.05 -4702.50 5982347.11
5845.99 -4751.35 5982412.96
5912.93 -4800.20 5982478.80
5979.86 -4849.05 5982544.65
6046.80 -4897.89 5982610.49
6113.74 -4946.74 5982676.33
6180.67 -4995.59 5982742.18
6247.61 -5044.43 5982808.02
6314.55 -5093.28
5982873.87
70 21 9.023 N 148 41 26.769 W
70 21 9.682 N 148 41 28.198 W
70 21 10.340 N 148 41 29.626 W
70 21 10.998 N 148 41 31.055 W
70 21 11.656 N 148 41 32.483 W
70 21 12.314 N 148 41 33.912 W
70 21 12.972 N 148 41 35.341 W
70 21 13.630 N 148 41 36.769 W
70 21 14.288 N 148 41 38.198 W
70 21 14.946 N 148 41 39.627 W
70 21 15.604 N 148 41 41.056 W
70 21 16.263 N 148 41 42.484 W
70 21 16.921 N 148 41 43.913 W
70 21 17.579 N 148 41 45.342 W
70 21 18.237 N 148 41 46.771 W
70 21 18.895 N 148 41 48.200 W
70 21 19.553 N 148 41 49.629 W
70 21 20.211 N 148 41 51.058 W
70 21 20.869 N 148 41 52.486 W
7021 21.527N 14841 53.915W
70 21 22.185 N 148 41 55.344 W
70 21 22.843 N 148 41 56.773 W
70 21 23.501 N 148 41 58.203 W
70 21 24.159 N 148 41 59.632 W
70 21 24.817 N 148 42 1.061 W
70 21 25.475 N 148 42
70 21 26.133 N 148 42
70 21 26.791 N 148 42
70 21 27.449 N 148 42
70 21 28.107 N 148 42
2.490 W
3.919 W
5.348 W
6.777 W
8.207 W
70 21 28.765 N 148 42 9.636 W
70 21 29.424 N 148 42 11.065 W
70 21 30.082 N 148 42 12.494 W
70 21 30.740 N 148 42 13.924 W
70 21 31.398 N 148 42 15.353 W
70 21 32.056 N 148 42 16.783 W
70 21 32.714 N 148 42 18.212 W
70 21 33.372 N 148 42 19.641 W
70 21 34.030 N 148 42 21.071 W
70 21 34.688 N 148 42 22.500 W
70 21 35.346 N 148 42 23.930 W
.'--.. .........-.......-... .........'...........................................-...."'."".""""""'.""".""".'..-"...."'-"--".....-...""""""",-""""""--""..-.--.".-.-.,.,,-,,,..".'.."-.--'.'--'..'..-.. ".,-.-.,--",-,.,"--."'."'..-..-...
('
BP Amoco
Planning Report - Geographic
(
Company: BP Amoco
: Field: Prudhoe Bay
Site: PB E Pad
Well: E-104
WeUpatb: Plan E-104
'. -- _m..... -'""_._-~---------'--______n- -- ..----- ---'--------'-"----------------------------"------'.---------.----..-.---.-.-.--------------------.u..-----..---"--'-----"--------------'----------------."
Date: 8/1/2001 Time: 09:41 :58 Page:
Co-ordinate(NE) Reference: Well: E-104, True North
Vertical (fVD) Reference: 62' 62.0
Section (VS) Reference: Well (0.00N,0.00E,321.45Azi)
Plan: E-104 wp01
7
Survey
-. .------------- ---- -----.-------..- ------------------------'--------------- -- - -- - ------------..------------ ------------------- --------------.,
Map Map <- Latitude -> <- Longitude -> I
MD Incl Azim TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min Sec I
ft deg deg ft ft ft ft ft
~ -----'-------_u_' - --- --- --'-"-"-'------------...------.- -_.u....-- ""----. ------------------------'----------------------"'--'---'--..---------.--..------.- ------ -_..------------------ ---.-----------..----J
; 11600.00 55.96 323.88 7417.08 6381.48 -5142.13 5982939.71 659169.49 70 21 36.004 N 148 42 25.359 W I
11700.00 55.96 323.88 7473.06 6448.42 -5190.97 5983005.56 659119.19 7021 36.662N 14842 26.789W
11800.00 55.96 323.88 7529.03 6515.36 -5239.82 5983071.40 659068.89 70 21 37.320 N 148 42 28.219 W
11900.00 55.96 323.88 7585.01 6582.29 -5288.67 5983137.25 659018.59 70 21 37.977 N 148 42 29.648 W
12000.00 55.96 323.88 7640.99 6649.23 -5337.51 5983203.09 658968.29 70 21 38.635 N 148 42 31.078 W
12100.00 55.96 323.88 7696.97 6716.17 -5386.36 5983268.94 658917.99 70 21 39.293 N 148 42 32.507 W
12200.00 55.96 323.88 7752.94 6783.10 -5435.21 5983334.78 658867.69 70 21 39.951 N 148 42 33.937 W
12300.00 55.96 323.88 7808.92 6850.04 -5484.06 5983400.62 658817.39 70 21 40.609 N 148 42 35.367 W
12400.00 55.96 323.88 7864.90 6916.98 -5532.90 5983466.47 658767.09 70 21 41.267 N 148 42 36.797 W
12500.00 55.96 323.88 7920.87 6983.91 -5581.75 5983532.31 658716.79 70 21 41.925 N 148 42 38.226 W
12600.00 55.96 323.88 7976.85 7050.85 -5630.60 5983598.16 658666.49 70 21 42.583 N 148 42 39.656 W
12700.00 55.96 323.88 8032.83 7117.79 -5679.44 5983664.00 658616.19 70 21 43.241 N 148 42 41.086 W
12736.48 55.96 323.88 8053.00 7142.62 -5696.96 5983688.44 658598.13 70 21 43.485 N 148 42 41.599 W
12800.00 55.96 323.88 8088.56 7185.14 -5727.99 5983730.27 658566.18 70 21 43.903 N 148 42 42.507 W
12886.48 55.96 323.88 8136.96 7243.04 -5770.23 5983787.22 658522.68 70 21 44.472 N 148 42 43.744 W
I..... _d___--_".---. '----"'--'----- ...u....-----""-..... --. --"-"'--"--""'---"'---""--------' --.-----.-------------------------. -----"-"-----"'" -... '----'--""------'.--......"...""---""",-----""---,..""",--,-,,,.--..---.--.....-......--.....-.'.-... -- -.--..-.-... -.......--.... ....... ........."
-
E-104i Kick Tolerance KU PB
(
Page 1 of 2
(
10/12/2001 11 :20 AM
bp
KICK TOLERANCE CALCULATOR
For Vertical, Deviated or Horizontal Wells
E-104;
Version 6.0, December 2000
us
Well: I
Kick Zone Parameters:
Open hole Size?
Measured Depth?
Vertical Depth?
Horizontal Length (>87 deg) ?
Tangent Angle Above Horizontal?
Min Pore Pressure Gradient?
Max Pore Pressure Gradient?
Kick Zone Temperature?
Weak Point Parameters:
9 Measured Depth?
10 Vertical Depth?
11 Section Angle «87 deg) ?
12 Min Fracture Gradient 1 EMW ?
13 Max Fracture Gradient 1 EMW
14 Weak Point Temperature?
Other Parameters:
15 Drill Collar 00 ?
16 Drill Collar Length?
17 Drillpipe 00 ?
18 Surface Pressure Safety Factor?
19 Mud Weight in Hole?
1
2
3
4
5
6
7
8
Annular Capacity Around BHA:
Annular Capacity Around DP:
At Min Fracture Gradient:
Circulating MAASP
Gas Gradient at Weak Point
For Min Pore Pressure:
Max Allowable Gas Height:
Kick Tolerance:
For Max Pore Pressure:
Max Allowable Gas Height:
Kick Tolerance:
At Max Fracture Gradient:
Circulating MAASP
Gas Gradient at Weak Point
For Min Pore Pressure:
Max Allowable Gas Height:
Kick Tolerance:
For Max Pore Pressure:
Max Allowable Gas Height:
Kick Tolerance:
(inch)
(ft)
(ft)
(ft)
(deg)
(ppg)
(ppg)
(deg.F)
(ft)
(ft)
(deg)
(ppg)
(ppg)
(deg.F)
(inch)
(ft)
(inch)
(psi)
(ppg)
(bbl/ft)
(bbl/ft)
Units (UK/US): I
8.75
12630
7993
0
0
7.800
8.000
158
Input Error Messages:
Non-Horizontal
0.03011
0.05008
Comments:
(psi) 334
(psi/ft) 0.0594
(ft) 2884
(bbl) 140.5
(ft) 2710
(bbl) 131.7
(psi) 432
(psi/ft) 0.0617
(ft) 3107
(bbl) 151.6
(ft) 2931
(bbl) 142.8
E-104i Kick Tolerance KUPB
(
Page 2 of 2
(
10/12/2001 11 :20 AM
[-Ô-Min Fracture Grad -<>-Max Fracture Grad I
155
150
-
.c
.c
-
C1) 145
(.)
c
co
"-
C1)
t=. 140
~
(.)
~
135
130
7.75
7.80
7.85
7.90
Pore Pressure Gradient
8.05
APPENDIX:
7.95
8.00
Maximum Allowable Gas Influx Volume
Based on Casing Burst & Surface Equipment Rating
Max Allowable Surface Pressure? (psi)
Near Surface Casing 10 ? (inch)
Near Surface Annular Temperature? (deg.F)
Gas Gradient at Max Surface Pres: (psi/H)
Near Surface Annular Capacity: (bbl/H)
At Minimum Pore Pressure Gradient:
Max Allowable Gas Height at Surface: (H)
Max Allowable Gas Vol. on Shut-in: (bbl)
At Maximum Pore Pressure Gradient:
Max Allowable Gas Height at Surface: (ft)
Max Allowable Gas Vol. on Shut-in: (bbl)
1260
-
:ë
.c
-; 1250
E
:::::I
Õ 1240
>
U)
~ 1230
C1)
.c
; 1220
0
<ë 1210
><
co
:æ 1200
7.75
Comments:
12355 Extends to hole TO
infinite
12166 Extends to hole TO
infinite
7.80
7.85
7.90
Pore Pressure Gradient
7.95
8.00
8.05
f.
It)
CD
~
....
~
H
202400
I DATE I
VENDOR
I CHECK NO. I
DATE
NET
INVOICE I CREDIT MEMO
DESCRIPTION
GROSS
" ",,;<
DISCOUNT
....
t')
t')
co
C\I
12/7/01
INV# CK120701
Application fqr permit
Permit to Dri]l
THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
BP EXPLORATION, (ALASKA) INC.
P.o. BOX 196612
ANCHORAGE, ALASKA 99519-6612
TO THE
. ORDER
OF.
H
,-
TOTAL ~
..::
No. H2O 2 4 0 a
FIRST NATIONAL BANK OF ASHLAND
AN AFFlUATE OF
NATIONAL CITY BANK
CLEVELAND, OHIO
8 p, r.. '" IIUtt.. ...,' ".,.00,.'..'.",\ f, ,1I,.,Jt.,.....'.',.',..,., i' ,'" Inn. 1m. ."",- """, .rll,
.~, ¡,.,1 If' 1,1."""""
, ".".'. '. . !1~HI C!UI ~wr.... t,,1 Iffl1' .,:::" 41":,."",
CONSOLIDATED COMMERCIAL ACCOUNT
56-389
412
.--~è,
'.'DATE AMOUNT
I D~c.7th. 2001 I r****$100.00***** I
M',",.....O"",,...,.,",T. VAL","',.I"D"",.,.,',AFT"""""E",.R 12,.o".,.,,_,gAYS
\<- '.' . . LL...
."...'c,...'pt¿~-- .
'0
AOGÇC , . ' .',
333 West. 7th Ave .steJn100n
Ar}..çhô3;'i3;g~, àk .99501
,.'
III 2 0 2" 0 0 III I: 0 ~ "¡ 2 0 ~ 8 q 51: 0 0 8 ... ~ ¡ q II' ;
CHECK 1
STANDARD LETTER
DEVELOPMENT
DEVELOPMENT
RED RILL
EXPLORATION
INJECTION WELL
/
INJECTION WELL
RED RILL
It'"'
I
('
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERIP ARAGRAPHS TO
BE INCLUDED IN TRANSNUTTAL LETTER
WELL NAME ¡?&J.. E -I D Vt.
CHECK WHAT APPLIES
ADD-ONS (OPTIONS)
MULTI LATERAL
"CLUE"
The permit is for a new well bore segment of existing well
. Permit No, API No. . .
Production should continue to be reported as a function of
the original API number stated above.
(If api number last two (2)
digits are between 60-69)
PILOT HOLE (PH)
In accordance with 20 AAC 25.005(1), all records, data and
logs acquired for tbe pilot hole must be clearly
differentiated in both name (name on permit plus PH)
and API number (50 -70/80) from
records, data and logs acquired for well (name on permit).
(
ANNULAR D\SPOSAL
( i/\ NO
-
Annular disposal bas not been requested. . .
ANNULAR DISPOSAL
Annular Disposal of drilling wastes will not be approved. . .
<-) YES
ANNULAR DISPOSAL
THIS WELL
Annular Disposal of drilling wastes will not be approved. . .
DISPOSAL INTO OTHER
ANNULUS
Please note tbat an disposal of fluids generated. .. .
<-) YES +
SP ACING EXCEPTION
Enclosed is tbe approved application for permit to drill tile
above referenced well. The permit is approved. subject to
full compliance with 20 AAC 25.055. Approval to perforate
and produce is contingent upon issuance of a conservation
order approving a spacing exception.
(ComDanv Name) will assume the liability of any protest to
the spacing exception tbat may occur.
Templates are located m drive\jody\templates
H 194727
DATE
INVOICE / CREDIT MEMO
{
DESCRIPTION
GROSS
f
,
~
VENDOR
DISCOUNT
fOOïECK NO. I
94727
ALASKAOILA
NET
00
100.00
072701 CK072701R
PYMT OMMENTS:
HANDL NG INST:
Per it To Drill ee
5/H - Terrie Hub Ie
X4628
E ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
BP EXPLORATION, (ALASKA) INC.
P.o. BOX 196612
ANCHORAGE, ALASKA 99519-6612
PAY
To The
ORDER
Of
~,\D~
100.00
TOTAL ~
100.00
FIRST NATIONAL BANK OF ASHLAND
AN AFFILIATE OF
NATIONAL CITY BANK
CLEVELAND, OHIO
No.H
CONSOLIDATED COMMERCIAL ACCOUNT
194727
56-389
~
100.00
00194727 ,
ONE HUNDRED & 00/10°************************************* US DOLLAR
ALASKA OIL AND GAS
CONSERVATION COMMISSION
333 WEST 7TH AVENUE
SUITE 100
ANCHORAGE
AK 99501
DATE AMOUNT
Q7/31/01 l $10~'991
NOTVALID AFTER 120 DAYS
Ç(c-JtP."'~";;Y ('J~~: '..'
. . .' .' " .....'....¡.' ..,..'..'..,'....' , (, '.' ,'..".'
, /", .' t.~ ~
, :' t ¡o/' "... #I!;, ,
..'...'",....,... .
III ¡. q L. 7 2 7 III I: 0 L. . 20 :l B q 5 I: 00 B L. L. . q III
..
CHECK 1
STANDARD LETTER
DEVELOPMENT
DEVELOPMENT
RED RILL
"
EXPLORATION
INJECTION WELL
INJECTION WELL
REDRILL
v'
( \
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTER/P ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME £ -loti ~ L
CHECK WHAT APPLIES
ADD-ONS (OPTIONS)
MULTI LATERAL
(If api number last two (2)
digits are between 60-69)
PILOT HOLE (PH)
ANNULAR DSPOSAL
( I) NO
V
ANNULAR DISPOSAL
L-J YES
ANNULAR DISPOSAL
THIS WELL
"CLUE"
The permit is for a new wellbore segment of existing well
. Permit No, API No. .
Production should continue to be reported as a function of
the original API number stated above. .
In accordance with 20 AAC 25.005(t), all records, data and
logs acquired for the pilot hole must be clearly
differentiated in both name (name on permit plus PH)
and API number (50 -70/80) from
records, data and logs acquired for well (name on permit).
Annular disposal has not been requested. . .
Annular Disposal of drilling wastes will not be approved. . .
Annular Disposal of drilling wastes will not be approved. . .
DISPOSAL INTO OTHER Please note that an disposal of fluids generated. . .
ANNULUS
L-J YES +
SPACING EXCEPTION
Templates are located m drive\jody\templates
Enclosed is the approved application for permit to drill the
above referenced well. The permit is approved 'subject to
full compliance with 20 AAC 25.055. Approval to peñorate
and produce is contingent upon issuance of a conservation
order approving a spacing exception.
(Company Name) will assume the liability of any protest to
the spacing exception that may occur.
WELL PERMIT CHECKLIST
FIELD & POOL
ADMINISTRATION 1. Permit fee attached. . . ';t<. . . . . . . . . . . . . . . . . . ,.~N
2. Lease number appropriate. . . . . . . . . . . . . . . . . . . iN
3. Unique well name and number. .. . . . . . . . . . . . . . . . N
4. Well located in a defined pool.. . . . . . . . . . . . . . . . . N
5. Well located proper distance from drilling unit boundary. . . . '.J N
6. Well located proper distance from other wells.. . . . . . . . . N
ï. Sufficient acreage available' in drilling unit.. . . . . . . . N,
8. If deviated, is wellbóre plat included.. . . . . . . . . . . . . . N
9. Operator only affected party.. . . . . . . . . . . . . . . . . . 'N_-
10. Operator has appropriate bond in force. . . . . . . . . . . . . N
11. Permit can be issued without conservation order. . . . . . . . N
12. Permit can.be issued without administrative approval.. . . . . N
13. Can permit be approved before 15-day wait.. . . . . . . . . . N
14. Conductor string provided .. . . . . . . . . . . . . . . . . . @ N / ' r 'r I. 'ì A -t7 I~ ~...
15. Surface casing protects all known USDWs. . . . . . . . . . . Y.: N €PA A.~:s ~j(.e_Yhl~./ Ptj í:)'Vl~ ~~ c.vOn Zf' rh:2;:lAD<;.I'-:;:¡, ,~~
16. CMT vol adequate to circulate on conductor & surf csg. . . . . N
17. CMT vol adequate to tie-in long string to surf csg. . . . . . . . ~@
18. CMT will cover all known productive horizons. . . . . . . . . . 'N
19. Casing designs adequate for C, T, B & permafrost. . . . . . . ' N 't;-
~~: ~~e:~~~I~~~~a~~~~;~:~b:~d~n~~~t b~e~ ~pp~o~~d: : : ~~~~~ \'~~, f'\~ ~~~~~ ~~
22. Adequate well bore separation proposed.. . . . . . . . . . .. , N ~_\~~ o..~~c..:.~ ~~t".~~~
23. If diverter required, does it meet regulations. . . . . . . . . . N
24. Drilling ,fluid program schematic & equip list adequate. . . . . N
25. BOPEs, do they meet regulation. . . . . . . . \:'^,":"'~ . . . N ...
. 26. BOPE press rating appropriate; test to \~ psig. N \..Þ..t..~~ t:~~~ ;)..ro.C > ~~\
27. Choke manifold complies w/API RP-53 (May 84). . . . . . . . N
28. Work will occur without operation shutdbwn. . . . . . . . . . . ~.' , . \ ~
29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . Y~ \.\é)~ "\ "!:,. ~,,\\\c.J:: \'1. ~t.\\~~",,\.-=,. ~~t"'~"-. Q.~ "o.c.,~~ .¡:.a.~~
30. Permit can be issued w/o hydrogen sulfide measures. . . . .-rvN .' ,'. /Em K) . " .
31. Data presented on potential overpressure zones. . . . . . . WN ¿u;/ v:; ..~-'!:...c.þ...d -h> '-Let iH!- g.. ~fe(j,Á,p, " ~S':.JI-¡-c=... /çj..;¡-?~';-(...'<..L v-c..'!:;'é"~YtA:v,
32. Seismic analysis of shallow gas zones. . . . . . . . . . . . . Y N . ??St..L-y€. /5 ..e,.J(, ec/-ed {-c' be. '~D _&~ I
A~5{R OAT/I;. 0' I 33. Seabed condition survey (if off.shore). . . . - . . . . . . . . Y N ..:5V . ~'~I Car?1-h:L~ Ø{:5 ,~ .
.#-10.1 r/. 34. Contact name/phone for weekly progress reports [exploratory only] Y N V U .
ANNULAR DISPOSAL35. With proper cementing records, this plan.
(A) will contain waste in a suitable receiving zone; . . . . . . .
(B) will not contaminate freshwater; or cause drilling waste. ..
to surface;' .
(C) will not impair mechanical integrity of the well used for disposal; Y N
(D) will not damage producing fonnation or impair recovery from a Y N
pool; and
E will not circumvent 20 MC 25.252 or 20 MC 25.412. Y N
GEOL Y: ENGINEERING: ~ COMMISSION:
~þ WM~
A,P,ti) DATE
,- " j(."), (7 -0 I
ENGINEERING
DATE
Cé:( ~
GEOLOGY
APPR
DATE
PROGRAM: exp - dev - redrll serv
GEOL AREA UNIT#
WELL NAME
V' I c..e.
wellbore seg _ann. disposal para req-
() .I / h s.T) ON/OFF SHORE -I -
COMP ANY
INIT CLASS
~
c
0
Z
0
-t
:E
:xl
(.
-
-t
m
~()ctJ \ '> p~o.~,",~ ~~,~ ~t:.~~
-
Z
-t
:I:
-
en
»
:xJ
m
»
(
Y N
Y N
t
\....)0 ~i' ~ \;)
r ~ ~'î::.o..
Com me nts/I nstructi ons:
(01"2«$»/0 \
c:\msoffice\wordian\diana\checklist (rev. 11/01/100)
WELL PERMIT CHECKLIST COMPANY E f'" WELL NAME E -I Or.{t).I.' PROGRAM: exp dev redrll v'" serv v" wellbore seg ann. disposal para req
FIELD & POOL Pß\!Á M~'J (" INIT CLASS GEOLAREA UNIT# ON/OFF SHORE Ot..>"--
;....(..'~..l^--
(t)N
ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . .
2. Lease number appropriate. . . . . . . . . . . . . . . . . . . Y N
3. Unique well name and number. .. . . . . . . . . . . . . . . . y N
4. Well located in a defined pool.. . . . . . . . . . . . . . . . . y N
5. Well located proper distance from drilling unit boundary. . . . Y N
6. Well located proper distance from other wells.. . . . . . . . . Y N
7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N
8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . Y N
9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N
10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N
11. Permit can be issued without conservation order. . . . . . . . Y N
APPR DATE 12. Permit can be issued without administrative approval.. . . . . Y N
13. Can permit be approved before 15-day wait.. . . . . . . . . . Y N
foliA
ENGINEERING 14. Conductor string provided . . . . . . . . . . . . . . . . . . . Y N
15. Surface casing protects all known USDWs. Y N u
. . . . . . . . . .
16. CMT vol adequate to circulate on conductor & surf csg. . . . . y N It
17. CMT vol adequate to tie-in long string to surf csg. . . . . . .. Y N It
18. CMT will cover all known productive horizons. . . . . . . . . . . e.~N ...-".. -= n ~.¡.., tJdC .
19. Casing designs adequate for C, T, B & permafrost. . . . . .. ~ N
20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . / ~ N q~,?~
21. If a re-drill, has a 10-403 for abandonment been approved. . . . ~ N V.. b "'. ¡ I ;1;<: ~
). N ...J,¡;;..
22. Adequate wellbore separation proposed.. . . . . . . . . . . .
\
23. If diverter required, does it meet regulations. . . . . . . . . , Y N iliA
24. Drilling fluid program schematic & equip list adequate. . . .. 'WN
t
25. BOPEs, do they meet regulation. . . . . . " . . . . . . . .. ~ N
APPR DATE 26. BOPE press rating appropriate; test to 4001() psig. ;} ~ N
~, I '1 hI'"!, 27. Choke manifold complies w/API RP-53 (May 84). . . " . . " ~~ N
!"" t.v
28. Work will occur without operation shutdown. . . . . . . . . .. ~~ N
29. Is presence of H2S gas probable.. . . . . . . . . . . . . . .. y@J
GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures. '" y N
31. Data presented on potential overpressure zones. . . . . . . y N
32. Seismic analysis of shallow gas zones. . . . . . . . . . . . . y N
APPR DATE 33. Seabed condition survey (if off-shore). . . . . . . . . . . . . y N
34. Contact name/phone for weekly progress reports [exploratory only] Y N
ANNULAR DISPOSAL35. With proper cementing records, this plan
(A) will contain waste in a suitable receiving zone; . . . . . . . y N
APPR DATE (B) will not contaminate.freshwater; or cause drilling waste. .. Y N
to surface; .
(C) will not impair mechanical integrity of the well used for disposal; Y N
(D) will not damage producing formation or impair recovery from a Y N
pool; and
(E) will not circumvent 20 MC 25.252 or 20 MC 25.412. Y N
GEOLOGY: ENGINEERING: UIC/Annular COMMISSION: Commentsllnstructions:
~~8 '~_VV6Æ-- WM 8~s
EM JMH
c
0
Z
0 (
-I
:e
:;0
-
-I
m
"---'.""""'.
-
Z
-I
:I:
-
en
»
ÃJ ./
m \
»
c:\msoffice\wordian\diana\checklist (rev. 11/01/100)
e
e
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify ftnding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
~
~
Sperry-Sun Drilling Servlces
LIS Scan Utillty
$Revision: 3 $
LisLib $Revision: 4 $
Tue Jun 04 08:37:24 2002
Reel Header
Service name.............LISTPE
Date.....................02/06/04
Origin...................STS
Reel Name................UNKNOWN
Contlnuatlon Number......01
Previous Reel Name.......UNKNOWN
Comments.................STS LIS
Tape Header
Service name.............LISTPE
Date.....................02/06/04
Origln...................STS
Tape Name................UNKNOWN
Continuation Number......01
Previous Tape Name.......UNKNOWN
Comments.................STS LIS
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
AK-MM-11195
J. MARTIN
L. VAUGHAN
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
MSL 0)
#
WELL CASING RECORD
Writing Library.
Scientific Technical Services
Writing Library.
Scientific Technical Services
E-104
500292304900
BP Exploration (Alaska), Inc
Sperry-Sun Drilling Servlces
04-JUN-02
MWD RUN 2
AK-MM-11195
J. MARTIN
L. VAUGHAN
MWD RUN 4
AK-MM-11195
J. MARTIN
A. MADSEN
6
11
14
3693
501
64.38
29.80
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
12.250 20.000 115.0
8.750 9.625 5013.0
#
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE
NOTED.
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MWD RUNS 1 & 2 WERE DIRECTIONAL AND NATURAL GAMMA
~O/~dOð
I Dc 50
r----"
~
PROBE (NGP).
4. MWD RUN 3 WAS ABORTED DUE TO A FAILED CASING TEST -
NO DATA WERE
ACQUIRED.
5. MWD RUN 4 COMPRISED DIRECTIONAL, DUAL GAMMA RAY
(DGR,UTILIZING
GEIGER-MUELLER TUBE DETECTORS), ELECTROMAGNETIC WAVE
RESISTIVITY
PHASE 4 (EWR4), COMPENSATED NEUTRON POROSITY (CNP),
AND STABILIZED
LITHO-DENSITY (SLD).
6. THERE ARE TWO GAPS IN THE DENSITY DATA DUE TO
EXCESSIVE ROPS:
5144.5'MD - 5160.S'MD AND 5817'MD - 5826.5'MD.
7. MWD DATA ARE CONSIDERED PDC PER E-MAIL FROM DEWAYNE
SCHNORR/BOB
DAWSON (BP) TO RAY OAKLEY (SSDS), DATED 1/3/02.
8. MWD RUNS 1, 2, AND 4 REPRESENT WELL E-104 WITH API#
50-029-
23049-00. THIS WELL REACHED A TOTAL DEPTH OF
12684'MD/8065'TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
(EXTRA-SHALLOW SPACING).
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP ~ SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME - DEEP
RESISTIVITY.
SPSF = SMOOTHED NEUTRON POROSITY (SANDSTONE MATRIX,
FIXED HOLE SIZE).
SNFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE.
SNNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE.
SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT
BIN) .
SCO2 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN).
SNP2 = SMOOTHED NEAR-DETECTOR-ONLY PHOTOELECTRIC
ABSORPTION FACTOR (LOW-
COUNT BIN).
SLDSLIDE = SLIDE INTERVALS ACCOUNTING FOR BIT-TO-SENSOR
DISTANCE.
PARAMETERS USED IN POROSITY LOG PROCESSING:
HOLE SIZE: 8.75"
MUD WEIGHT: 9.5 - 10.9 PPG
MUD SALINITY: 100 - 900 PPM CHLORIDES
FORMATION WATER SALINITY: 18621 PPM CHLORIDES
FLUID DENSITY: 1.0 G/CM3
MATRIX DENSITY: 2.65 G/CM3
LITHOLOGY: SANDSTONE
$
File Header
SerVlce name.............STSLIB.OOl
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......O2/06/04
Maximum Physlcal Record..65535
File Type................LO
PrevlOus File Name.......STSLIB.OOO
Corrunent Record
FILE HEADER
FILE NUMBER:
1
~
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
NCNT
FCNT
NPHI
FET
PEF
RPD
RPM
RPS
RPX
DRHO
RHOB
$
.~
clipped curves; all bit runs merged.
.5000
START DEPTH
70.0
nO.5
4938.5
4938.5
4938.5
4983.5
5000.0
5000.5
5000.5
5000.5
5000.5
5015.5
5015.5
STOP DEPTH
12647.0
12684.0
12594.0
12594.0
12594.0
12639.5
12603.5
12639.5
12639.5
12639.5
12639.5
12603.5
12603.5
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED
PBU
MWD
MWD
MWD
$
DATA SOURCE
TOOL CODE
BIT RUN NO
1
2
4
#
REMARKS:
MERGED MAIN PASS.
$
MERGE TOP
70.0
2985.0
5027.0
MERGE BASE
2985.0
5027.0
12684.0
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.................Down
Optlcal log depth units...........Feet
Data Reference Polnt..............Undeflned
Frame Spacing.....................60 .1IN
Max frames per record.............Undeflned
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Unlts Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
NPHI MWD PU-S 4 1 68 32 9
FCNT MWD CNTS 4 1 68 36 10
NCNT MWD CNTS 4 1 68 40 11
RHOB MWD G/CM 4 1 68 44 12
DRHO MWD G/CM 4 1 68 48 13
PEF MWD BARN 4 1 68 52 14
First Last
Name SerVlce Unlt Min Max Mean Nsam Reading Readllìg
DEPT FT 70 12684 6377 25229 70 12684
Rap MWD FT/H l. 43 926.41 242.772 25148 110.5 12684
GR MWD API 12.06 334.01 77.6476 25155 70 12647
RPX MWD OHMM 0.42 44. 07 3.16626 15279 5000.5 12639.5
RPS MWD OHMM 0.32 36.37 3.21492 15279 5000.5 12639.5
RPM MWD OHMM 0.27 2000 4.32423 15279 5000.5 12639.5
~
~
RPD MWD OHMM 0.3 2000 6.74423 15279 5000.5 12639.5
FET MWD HOUR 0.06 74.42 1. 00124 15313 4983.5 12639.5
NPHI MWD PU-S 8.08 76.95 38.8889 15276 4938.5 12594
FCNT MWD CNTS 402 1491 567.47 15273 4938.5 12594
NCNT MWD CNTS 2016 4208 2781.45 15312 4938.5 12594
RHOB MWD G/CM 1. 267 3.546 2.3147 15127 5015.5 12603.5
DRHO MWD G/CM -0.257 1.366 0.0426658 15127 5015.5 12603.5
PEF MWD BARN 0.55 14.25 2.50287 15188 5000 12603.5
First Reading For Entlre Fi1e..........70
Last Reading For Entlre File...........12684
Flle Traller
Servlce name.............STSLIB.OOl
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......02/06/04
Maximum Physical Record..65535
Flle Type................LO
Next File Name...........STSLIB.002
Physlcal EOF
Tlle Header
Servlce name.............STSLIB.002
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......02/06/04
Maximum Physical Record..65535
File Type................LO
Previous File Name.......STSLIB.OOI
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
header data for each bit run in separate flIes.
1
.5000
START DEPTH
70.0
110.5
STOP DEPTH
2942.0
2985.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
29-NOV-Ol
Insite
66.16
Memory
2985.0
115.0
2985.0
.0
52.8
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
PB02310HWRG6
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
12.250
#
BOREHOLE CONDITIONS
MUD TYPE:
Spud
~
~
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
8.80
300.0
9.0
200
10.2
61.5
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Directlon............ .....Down
Optical log depth units...........Feet
Data Reference Polnt.. ............Undefined
Frame Spaclng......... """"'" .60 .1IN
Max frames per record.............Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
Name SerVlce Order
DEPT
ROP MWD010
GR MWD010
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
API 4 1 68 8 3
First Last
Name Service Unlt Min Max Mean Nsam Reading Readlng
DEPT FT 70 2985 1527.5 5831 70 2985
ROP MWD010 FT/H 1. 43 573.51 170.139 5750 110.5 2985
GR MWDOI0 API 19.43 128.24 57.7965 5745 70 2942
First Readlng For Entire File..........70
Last Reading For Entire File...........2985
File Trailer
Service name.............STSLIB.002
Service Sub Level Name...
Version Number...........1.0.0
Date of Generatlon.......02/06/04
Maxlmum Physical Record..65535
File Type................LO
Next File Name...........STSLIB.003
Physical EOF
File Header
Service name.............STSLIB.003
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......02/06/04
MaXlmum PhYSlCal Record..65535
Flle Type................LO
Previous File Name...... .STSLIB.002
Comment Record
~
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
3
r"'\.
header data for each bit run in separate files.
2
.5000
START DEPTH
2942.5
2985.5
STOP DEPTH
4979.0
S027.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.....O
Logging Directlon.................Down
Optical log depth units...........Feet
Data Reference Polnt..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent va1ue......................-999
Depth Units.......................
Datum Speclflcatlon Block sub-type...O
Name Service Order
DEPT
ROP MWD020
30-NOV-01
Insite
66.16
Memory
5027.0
2985.0
5027 .0
51. 8
57.9
TOOL NUMBER
PB02310HWRG6
12.250
Spud Mud
9.50
300.0
8.6
1000
6.0
74.2
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
GR
MWD020
,~
API
4
,-...."
1
68
8
3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 2942.5 5027 3984.75 4170 2942.5 5027
ROP MWD020 FT/H 4.71 628.17 265.565 4084 2985.5 5027
GR MWD020 API 33.03 155.84 87.427 4074 2942.5 4979
First Reading For Entire File..........2942.5
Last Reading For Entire File...........5027
File Trailer
Service name.............STSLIB.003
Service Sub Level Name...
Version Nurnber...........l.O.O
Date of Generation.......02/06/04
Maximum Physlcal Record..65535
'File Type................LO
Next File Name...........STSLIB.004
Physical EOF
File Header
Service name.............STSLIB.004
SerVlce Sub Level Name...
Verslon Number...........1.0.0
Date of Generation.......02/06/04
Maximum Physical Record..65535
File Type................LO
PreVlOUS Flle Name.......STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
NCNT
FCNT
NPHI
GR
FET
PEF
RPD
RPM
RPS
RPX
DRHO
RHOB
ROP
$
4
header data for each bit run in separate files.
4
.5000
START DEPTH
4938.5
4938.5
4938.5
4979.5
4983.5
5000.0
5000.5
5000.5
5000.5
5000.5
5015.5
5015.5
5027.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
12594.0
12594.0
12594.0
12647.0
12639.5
12603.5
12639.5
12639.5
12639.5
12639.5
12603.5
12603.5
12684.0
07-DEC-Ol
Insite
66.16
Memory
12684.0
5027.0
12684.0
47.2
60.8
A
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
GNP
SLD
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
COMPENSATED NEUTRON
STABILIZED LITHO DEN
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logglng Dlrection.................Down
Optical log depth units...........Feet
Data Reference Polnt..............Undefined
Frame Spaclng.....................60 .1IN
Max frames per record.............Undefined
Absent value......................-999
Depth Unlts.......................
Datum Specification Block sub-type...O
/~
~:
TOOL NUMBER
PB02310HWRG6
PB02310HWRG6
PB02310HWRG6
PB02310HWRG6
8.750
LSND
10.90
53.0
8.8
800
4.0
1. 050
.560
1.600
1. 450
70.0
138.2
70.0
70.0
Name Service Order Units Slze Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FT/H 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
RPX MWD040 OHMM 4 1 68 12 4
RPS MWD040 OHMM 4 1 68 16 5
RPM MWD040 OHMM 4 1 68 20 6
RPD MWD040 OHMM 4 1 68 24 7
FET HWD040 HOUR 4 1 68 28 8
NPHI MWD040 PU-S 4 1 68 32 9
FCNT MWD040 CNTS 4 1 68 36 10
NCNT MWD040 CNTS 4 1 68 40 11
RHOB MWD040 G/CM 4 1 68 44 12
DRHO MWD040 G/CM 4 1 68 48 13
PEF MWD040 BARN 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 4938.5 12684 8811.25 15492 4938.5 12684
ROP MWD040 FT/H 1.53 926.41 263.964 15314 5027 . 5 12684
GR MWD040 API 12.06 334.01 82.4862 15336 4979.5 12647
RPX MWD040 OHMM 0.42 44.07 3.16626 15279 5000.5 12639.5
RPS MWD040 OHMM 0.32 36.37 3.21492 15279 5000.5 12639.5
RPM MWD040 OHMM 0.27 2000 4.32423 15279 5000.5 12639.5
~
,r"'.,
RPD MWD040 OHMM 0.3 2000 6.74423 15279 5000.5 12639.5
FET MWD040 HOUR 0.06 74.42 1. 00124 15313 4983.5 12639.5
NPHI MWD040 PU-S 8.08 76.95 38.8889 15276 4938.5 12594
FCNT MWD040 CNTS 402 1491 567.47 15273 4938.5 12594
NCNT MWD040 CNTS 2016 4208 2781. 45 15312 4938.5 12594
RHOB MWD040 G/CM 1. 267 3.546 2.3147 15127 5015.5 12603.5
DRHO MWD040 G/CM -0.257 1.366 0.0426658 15127 5015.5 12603.5
PEF MWD040 BARN 0.55 14.25 2.50287 15188 5000 12603.5
First Readlng For Entire File..........4938.5
Last Reading For Entire File...........12684
Flle Trailer
Service name.............STSLIB.004
Service Sub Level Name...
Verslon Number...........1.0.0
Date of Generation.......02/06/04
Maximum Physlcal Record..65535
File Type................LO
Next File Name...........STSLIB.005
Physical EOF
Tape Trailer
Service name.............LISTPE
Date.....................02/06/04
Origln...................STS
Tape Name................UNKNOWN
Continuation Number......01
Next Tape Name...........UNKNOWN
Comments.................STS LIS
Writing Library.
Scientific Technical Services
Reel Trailer
Service name.............LISTPE
Date.....................02/06/04
Origin.... ....... ... .....STS
Reel Name................UNKNOWN
Continuation Number......01
Next Reel Name...........UNKNOWN
Comments.................STS LIS
Writing Library.
Scientific Technlcal SerVlces
Physical EOF
Physlcal EOF
End Of LIS File