Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout193-063Nolan Vlahovich Hilcorp Alaska, LLC Geotech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 4/10/2025 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#2025010 Well API #PTD #Log Date Log Company Log Type AOGCC E-Set# BRU 211-26 50283201280000 208112 1/27/2025 AK E-LINE PPROF T40287 END 1-41 50029217130000 187032 3/13/2025 HALLIBURTON MFC40 T40288 END 2-14 50029216390000 186149 3/12/2025 HALLIBURTON MFC40 T40289 END 3-33A 50029216680100 203215 3/23/2025 HALLIBURTON COILFLAG T40290 GP AN-17A 50733203110100 213049 12/29/2024 AK E-LINE Perf T40291 KALOTSA 3 50133206610000 217028 3/3/2025 AK E-LINE PPROF T40292 KU 12-17 50133205770000 208089 1/28/2025 AK E-LINE Perf T40293 MPI 2-14 50029216390000 186149 2/17/2025 AK E-LINE Plug/Cement T40294 NCIU A-21 50883201990000 224086 3/28/2025 AK E-LINE Plug-Perf T40295 ODSN-25 50703206560000 212030 3/7/2025 HALLIBURTON CORRELATION T40296 PBU 02-08B 50029201550200 198095 3/17/2025 HALLIBURTON RBT T40297 PBU D-08B 50029203720200 225007 3/22/2025 HALLIBURTON RBT T40298 PBU J-25B 50029217410200 224134 3/10/2025 HALLIBURTON RBT T40299 PBU K-12D 50029217590400 224099 3/18/2025 HALLIBURTON RBT T40300 PBU K-19B 50029225310200 215182 3/27/2025 HALLIBURTON RBT T40301 PBU L1-15A 50029219950100 203120 3/27/2025 HALLIBURTON PPROF T40302 PBU M-207 50029238070000 224141 3/18/2025 HALLIBURTON IPROF T40303 PBU P1-04 50029223660000 193063 3/28/2025 HALLIBURTON PPROF T40304 PBU W-220A 50029234320100 224161 3/11/2025 HALLIBURTON RBT T40305 Revision explanation: Fixed API# on log and .las files Please include current contact information if different from above. T40304PBU P1-04 50029223660000 193063 3/28/2025 HALLIBURTON PPROF Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2025.04.10 13:48:56 -08'00' Kaitlyn Barcelona Hilcorp North Slope, LLC GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 E-mail: kaitlyn.barcelona@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal Received By: Date: DATE: 10/20/2021 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL PBU P1-04 (PTD 193-063) Production Profile 10/06/2021 Report 10/11/2021 Please include current contact information if different from above. 37' (6HW eceived By: 10/20/2021 By Abby Bell at 2:36 pm, Oct 20, 2021 , • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMIIN APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well Q - Operations shutdown❑ Suspend 0 Perforate ❑ Other Stimulate LI Pull Tubing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Sus Well 0 p Alter Casing ❑ Other Cement IA Q . 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: Exploratory ❑ Development Q- 3. Address: P.O.Box 196612 Anchorage,AK 5. Permit to Drill Number 193-063 2g 99519-6612 Stratigraphic El 6. API Number: 50-0 22366-00-00 Service ❑ 7. If perforating: 7 What Regulation or Conservation Order governs well spacing in this pool? 8. Well Name and Numper: Will planned perforations require a spacing exception? Yes ❑ No Q PTM P1-04 9. Property Designation(Lease Number): 10. Field/Pools: ADL 0028297 • PRUDHOE BAY,PT MCINTY y4 OIL • O C T 1 9 2016 11. PRESENT WELL CONDITION SUMMARY NI P=C(n (/y, Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP �' _ 1J 11600 • 9215 p (Ps)' ' cgs(MD): 10495 8285 1 (' Casing Length Size 10495 11485 MD TVD Burst Collapse Structural Conductor 74 20"94#NT6OLE 41 -115 ?_9, 2300 520 Surface 3941 10-3/4"45.5#NT-80 39-398051 4560 Intermediate 1730 Production See Attachment See Attachment � See Attachment -e Attachment See Attachment Liner ' See Attachment la Perforation Depth MD(ft): Perforation Depth TVD(ft): TubingSize: I Tubing Grade: Tubing MD(ft) See Attachment See Attachment 4-1/2"12 I Packers and SSSV Type: 4-1/2"Baker SABL-3 Packer i 13Cr80 35-10517 �',•C -rs d SSSV MD(ft)and TVD(ft): 10447, 8247.40 4-1/2"Camco TRCF-4A SSSV 12.Attachments: Proposal Summary2322, 2242.40 Q Wellbore Schematic Q e Class after proposed work: Detailed Operations Program 0 BOP Sketch ❑ xpl• atory ❑ Stratigraphic ❑ Development Q Service ❑ 14.Estimated Date for Commencing Operations: 15. Well Status after proposed work: Oil Q WINJ ❑ WDSPL ❑ 16.Verbal Approval: Date: '[\ Suspended ❑ GAS ❑ WAG ❑ Commission Representative: GSTOR ❑ SPLUG ❑ GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17.I hereby certify that the foregoing is true and the prure approved herein will not Contact Worthington,Aras J be deviated from without prior written approval. Printed Name Worthington,Aras J Email Aras.Worthington@bp.com Title Interventions&Integrity Engineer Signature Phone +1 907 564 4102 Date /e COMMISSION USE ONLY Conditions of approval:Notify Commission so that a representative may witness I Sundry Num(be,,r: Plug Integrity ❑ B P Test ❑ Mechanical Integrity Test ❑ `+4 5-3 9 Y Location Clearance ❑ Other: SCANNED MAR 2 02013 Post Initial Injection MIT Req'd? Yes❑ No in Spacing Exception Required? Yes❑ No hof Subsequent Form Required: fU/ —4. 4_- Approved by: APPROVED BYTHE COMMISSIONER COMMISSION Date: ORIGINAL Form 10-403 Revised 11/2015 Approved application is valid for 12 months from the date of approval. Submit Form and Attachments in Duplicate •o k Well: P1-04 P1-04 IA Cement Job Intervention & Integrity Engineer Aras Worthington (907) 564-4102 Production Engineer Kaity Burton (907) 564-5554 History P1-04 is a GDWFI producer with on-time averaging 68% in the last 10 years, drilled in 1993. It has been flowed into HP service the majority of life being choked to manage GOR initially then water and GOR in later life. In 2015, P1-04 was SI for a tubing and PC leak at around 6050'. An IA squeeze is being proposed to return the well to full-time production at LPC. This repair will cement the bottom two GL mandrels leaving the top GL mandrel to be used for kick off. The depletion strategy for Pt McIntyre is to maintain fluid contacts and pressures in the field, so it is not expected that this well would need full time G/L. Job Economics P1-04 has 0.5 MMBO remaining oil to recover and an expected 12-mo IOR of 228 bopd. This integrity repair is proposed to maintain integrity/operability of the well long term. Objective The purpose of this program is to return P1-04 to operable status by cementing the IA to seal off the PC leak and the tubing leak. TOC in the IA would be at —5000' MD. A patch will be run across the tubing leak in addition to the cement job. Post-Job Evaluation This well is an producer so an AA will not be applied for. The following internal evaluation criteria will apply: MITIA and MITT to maximum anticipated SIWHP ➢ SCMT to confirm Top of Cement (TOC) Long-Term Integrity Monitoring ➢ Record WHPs and Injection rate daily (includes pressure-monitoring of the —5000' deep Inner annulus). ➢ 4-year (quadrennial) MITTs and MITIAs to maximum anticipated SIWHP. • • TRIS= 4-1/16"CE -- WELLHEAD= --CM SAFETY NOTES: ACTUATOR= OT1S P1-04 Current 1 OKB.ELEV= 50.4' BF.ELEV= I I KOP= 1152' / Max Angie= 46 @ 6453' "CONDUCTOR, — ? Datum MD= 11185' #, — — ® I 2321' —�4-t2'CAMCO TRCp SSSV, D=3.812" 'Datum 1VD= 8800'SS D. • 110-3/4"CSG,45.5#,NT-80 NSCC,D=9.953" 1—I 3982' GAS LFT MANDRELS Leak in 4-1/2"tubing ST NO TVD DEV TYPE VLV LATCH PORT DATE � 6050' � 112 8087 6488 42 KBMG MY BK 0 03/19/16 1 4783 4139 44 Kelm MY BK 0 03/19/16 PC Leak in 7-5/8"casing 6050' MD _ 3 10315 8147 40 KBMG MAY BK 0 0426/03 Minimum ID =3.725"c 10494' - 4-1/2" PARKER SWN NIPPLE ( 10377' —{4-12"BKR'Ctvk! SLD sLV,D=3.612' Cement Plug#1 pumped FB or laid in w/CT w 1 K ANCHOR,1.1 3.6 f- I II I 10477' I--{4-12'PARKER SWS NP,D=3.813" 1 II 10495' 1-14-1/2"PARKER SWN NP,D=3.725' I 10495' H4-1/2"PXN PLUG(03/21/16) I 4-12'TBG,126#,13CR-80 NSCT, H 10516' ' ` I 10517' H4-12 D"WLEG, =4.00" 0152 bpf,D=3.958' -- I 10500' H ELK)TT LOGGED 06/12/93 I 4---- 1 10117' —17'MARKER JO�trS(2 EACH) I FERE-ORATION SUMMARY REF LOG: ATLAS DLL/GR ON 05/22/93 ANGLE AT TOP R37/F: 33'@ 11024' Note:Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sgz SHOT SQZ 2-7/8' 6 11024-11044 0 0523/04 3-3/8" 6 11070-11090 0 08/19/93 3-3/8' 6 11120-11230 0 08/19/93 a 2-7/8' 6 11190-11210 0 05/23/04 3-318" 6 11250-11335 0 08/19/93 a 2-7/8' 6 11290-11330 0 05/22/04 a 2-7/8" 6 11355-11375 0 05/22/04 3.3/8' 6 11355-11460 0 08/19/93 0 lir 111486'CTM --JFlSFt 3-3/8'CROSS-FLOW FSP(03/16/16) I PBTD H 11511' 17-5/8'CSG,29.7#,13CR-95 NSCC, I, 11588' 1'4'�'�'�,�`�'1������, .0459 bpf,D=6.875' DATE REV BY COMMENTS DATE REV BY COQ PDMITMCMttYREUNIT 05/27/93 POO(-7 ORIGINAL COMPLETION 11/03/15 RCT/JIuD GLV C/O(11/01/15) 04/11/03 JJ/KAK GLV C/OWELL:: P1-04 03/21/16 TFA/JMD PULL®BASET FISH(03/16/16) PERMIT No:9930630 04/26/03 JMTP GLV C/O 03/22/16 JMG/JM)SET PXN PLUG(03/21/16) AR No: 50-029-22366-00 0523/04 MJA/KAK ADPERFS 03/25/16 SWGJMC GLV C/O(03/19/16) SEC 16,T12N,R14E,1463'FSL&681'FEL 03/18/09 RLW/SV PERF CORRECTIONS 08/15/14 PJC SET BP(08/05/14) ___ BP Exploration(Alaska) 2 • • TREE= 4-1/16'CE WELLHEAD= CNV 1 SAFETY NOTES: ACTUATOR= OTIS P1-04 Proposed OKB.HEV= 50.4' BF.ELEV= KOP= 1152' / 1443X Angle= 46 @ 6453' CONDUCTOR. H Dalian = 11185' #, © ( 2321' {4-1/2'CAMCO 7RCF SSSV, D=3.812' 1 Dalian TVD= 8800'SS D= 110-314'CSG,45.5#,NT-80 NSCC,D=9.953" J 3982' GAS LFT MANDRELS ST MD WO DEV TYPE VLV LATCH PORT []ATE TOC in the IA @—5000' MD 1 4783 4139 44 KBMG DMi BK 0 03/19/16- 2 8087 6488 42 KBM3 DMV BK 0 03/19/16 ' 3 10315 8147 40 KBMG DMY BK 0 04/26/03 Minimum ID =3.725"@ 10494' r 4-1/2" PARKER SWN NIPPLE 64 I I 10377' H4-1/2"BKR'GMT SLD SLV,D=3.812" I II 1!,M. 10446' 117-5/8'X 4-112'BKR SABL-3 PKR I w/K ANCHOR,1)3.87' 10477' H4-1/2'PARKER SWS NP,D=3.813' I 10495` iH4-1/2'PARKER SWN NP,D=3.725' J 10495' H4-1/2"PXN PLUG(03/21/16) , 4-1/2"TBG,12.6#,13CR-80 NSCT, IH 10516' j —I 1051T j-+t-1/Y WLEG,ID=4.00"I .0152 bpf,D=3.958" 10500' I J i E LMO TT LOGGED 06/12/93 I 10117' H7'MARKER JOINTS(2 EACH) I PERFORATION S&IJ4ARY REF LOG: ATLAS DLL/GR ON 05/22/93 ANGLE AT TOP PERF: 33"C 11024' Note:Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sgz SHOT SO2 bi 2-7/8" 6 11024-11044 0 05/23/04 3-3/8' 6 11070-11090 0 08/19/93 CI 3-3/8' 6 11120-11230 0 08/19/93 a 2-7/8' 6 11190-11210 0 05/23/04 3-3/8' 6 11250-11335 0 08/19/93 2-718" 6 11290-11330 0 05/22/04 2-7/8" 6 11355-11375 0 05/22/04 3-3/8' 6 11355-11460 0 08/19/93 a 11485'CTM1-FISH:3-3/8'CROSS-FLOW IBP(03/16/16) PBTD H 11511' 7-5/8'CSG,29.7#,13CR-95 NSCC, --I 11588' J 1�1���4�*�1�1�*�.... AAA 1.0459 bpf,D=6.875" DATE REV BY COM LENTS DATE REV BY COMMENTS PONT E MCN1- 4 UNIT'05/27/93 POOL 7 ORIGINAL COMPLETION 11/03/15 RCTlJM3 GLV GO(11!01/15) WELL: � � 04/11/03 JJ/KAK GLV GO 03/21/16 TFA/JM)PULLED BP/SET FISH(03/16/16) IeZMT No:'1930630 04/26/03 JM/TP GLV GO 03/22/16 JMG/JM?SET PXN PLUG(03/21/16) 05/23/04 MJA/KAK ADPERFS API N4: 50-029-22366-00 4 'FSL& 81' 03/25/16 SVVC1JtuC GLV GO(03/19/16) SEC 16,T12N R14E 1463'FSL&681'FE 03/18/09 RLW/SV PERE-CORRECTIONS 08/15/14 PJC SET BP(08/05/14) BP Exploration(Alaska) 3 EE 4-1,'16"CIE LI fif Al) CAN ,FE TY NOTES: .0tiAI«f.y DTRs P1-04 Proposed P&A 1 :8 ETV 50.4' ELEV= ' ' ix Angie= 46 @ 6453' CONDUCTOR, — ? Cement Plug#3 circulated down tubing, tum MD= 11185' —#' I © through tubing punches and up IA from tun TVD= 8800 SS p= " —1000' MD to surface 10-3/4"CSG,45.5#,NT-80 NSCC,D=9.953" H 3982' GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 4783 4139 44 KBMG DMY BK 0 03/19/16 2 8087 6488 42 KBMG DMY BK 0 03/19/16 3 10315 8147 40 KBMG DMY BK 0 04/26/03 Cement Plug#2 circulated down OA to surface I casing shoe I 10377' h4-1/2"BKR"CM/SLD SLV,D=3.812' Cement Plug#1 pumped FB or laid in w/CT I 10477' 1—4-1/2'PARKER SWS NP,D=3.813' f 10495' 1—4-1/2'PARKER SWN NP,D=3.725' 10495' I—4-1/2'PXN PLUG(03/21116) 4-112'TBG,12.6#,13CR-80 NSCT, —I 10516' 1—^ ---3 10517' H4-1/2"WLEC,,D=4.00'I .0152 bpf,D=3.958" J 10500' Hari LOGO 06/12/93 1 10117' (—r MARKER JOMS(2 EACH) PERFORATION SUMMARY REF LOG: ATLAS OLL/GR ON 05/22/93 ANGLE AT TOP FERE: 33"@ 11024' la Note:Refer to Roduction OB for historical perf data Jl SIZE SPF MITERVAL Opn/Sqz SHOT SQZ 2-7/8" 6 11024-11044 0 05/23/04 3-3/8" 6 11070-11090 0 08/19/93 3-3/8' 6 11120-11230 0 08/19/93 I, 2-7/8" 6 11190-11210 0 05/23/04 3-3/8' 6 11250-11335 0 08/19/93 2-7/8' 6 11290-11330 0 05/22/04 2-7/8" 6 11355-11375 0 05/22/04 3-3/8" 6 11355-11460 0 08/19/93 I 11485'CTM 1-1-FISI 3-318"CROSS-FLOW IBP(03/16/16) PBTD H 11511' .1•�.�••••�•�•1%. 7-5/8"CSG,29.7#,13CR-95 NSCC, — 11588' )'.'�,.`�'.'�'.t�'�� .0459 bpf,D=6.875' DATE REV BY CONVENTS DATE REV BY COMMENTS FTOINT MCNJIYRE UNIT 05/27/93 POOL 7 ORIGINAL COMPLETION 11/03/15 RCT/JMD GLV C/O(11/01/15) WB.L: P1-04 04/11/03 JJ/KAK GLV C/O 03/21/16 TFA/JM)FULLED BP/SET FISH(03/16/16) FERMT No:9930630 04/26/03 JMKTP GLV C/O 03/22/16 JMG/JMD SET PXN PLUG(03/21/16) AR No: 50-029-22366-00 05/23/04 MIA/KAK ADPEZFS 03/25/16 SWC/JMC GLV C/O(03/19/16) SIM 16,T12N,R14E,1463'FSL&681'FB_ 03/18/09 RLW/SV FERE CORRECTIONS 08/15/14 PJC SET BP(08/05/14) BP Exploration(Alaska) 4 • Job Notes: • ➢ The tubing leak and PC leak are both @ -6050' MD ➢ The PC leak rate is -1 bpm @ 400 psi Cement Calculations 7-5/8" x 4-1/2" volume from 10,400' MD to 5000' MD 142 bbls Total Cement to Pump(2 bbls excess) 144 bbls Cement Type/weight: Class G 15.8 ppg mixed on the fly. Field blend to be =lab ppg +/- 0.1 ppg Slurry Temperature: between 80° and 110°F Fluid Loss: 40-200cc Compressive Strength: 2000 psi in 48 hrs. Thickening Time: Minimum 6 hours Activity Time(hours) Shearing time,quality control, PJSM 0 Cement displacement 3 Cement contamination 2 Safety 1 Minimum required thickening time: 6 Cement Ramp for Blend Time Temp Pressure 0:00 90 0 1:00 130 2900 2:00 140 2400 3:00 140 1500 4:00 120 1500 7:00 100 1500 15:00 90 1500 Volumes: top volume MD bot MD Size ID bbls/ft. Ft. bbls 7-5/8"29.7# x 4-1/2" 6.875" 7-5/8" x 4-1/2" annulus 0 10400' 12.6# x 4.5" 0.0262 10400' 273 4-1/2" tubing 0 10400' 4-1/2" 12.6# 3.958 0.0152 10400' 158 5 Slickline • • 1. Pull PXN plug @ 10,450' MD. Eline WI Fulibore 1. Set 4-1/2" CBP @ -10,420' MD (in the middle of the first full joint of tubing above the packer). 2. MITT to 2500 psi to verify CBP is set and will hold cement hydrostatic pressure. 3. Punch tubing w/ 5' tubing puncher from -10,397' - 10,4002' MD (across the top collar of the first full joint above the packer). Note indication of TxIA communication in AWGRS. If no indication is seen, then pump down tubing and verify pressure communication to IA. 4. Set 4-1/2" HES Composite Fasdrill SVB Cement Retainer @ -10,395' MD (middle of the first 10' pup joint above the first full joint above packer). Note: All depths reference attached 4-1/2" tubing tally dated 5/24/1993. 6 S • Coiled Tubing 1. Rig up a micromotion to IA returns. 2. RIH with HES Fasdrill SVB cement retainer stinger. Displace CT x TBG backside to heated 160F diesel while RIH (-130 bbls of volume on backside). 3. Sting into retainer and establish diesel circulation down CT and take returns from the IA to tanks. Verify coil backside is SI. Pump the following fluid schedule. Note: Do not pump any freezable fluids other than cement and FW spacer through retainer into the IA as these fluids will remain in the IA after the cement job. ➢ *270 bbls of heated diesel (160F) ➢ Minimal FW spacer ➢ 144 bbls cement per design ➢ CT volume of FW (unsting from retainer w/ last 1-2 bbls of cement in CT) *Note: There are two reasons for the heating the diesel: A. The cement in the IA acts as an extended packer. Tubing movement models indicate that heating the entire wellbore to -140F before setting a packer on a rig is the optimum temperature for locking the tubing in place in PBU (prevents buckling when the tubing is heated up via producing or injecting). Heating the entire wellbore for this type of job to 160F will approximate this (wellbore fluids will cool before cement sets). B. Heating the entire wellbore helps the cement to cure. There have been a couple of IA cement jobs where fluids were not heated prior to cementing and the cement took much longer to cure. In one case it took about 2 weeks before the well would pass an MITIA. 4. This should put the TOC in the IA @ -5000' MD. As cement rises above the tubing leak @ -6050' MD, expect the CTxTBG backside pressure to rise to -350 psi. Do not bleed this pressure off as it will only allow cement to leak into the tubing. Maintain this pressure (-350 psi or whatever pressure the backside settles out at) for the remainder of the job to keep the IA cement in place. See Coil Contingency Procedure#1 below if cement locks up while pumping into the IA. 5. Unsting from the cement retainer and lay the last 1-2 bbls of cement in the TBG @ 1:1. Maintain backside pressure as described in the step#4 while POOH. 6. Freeze protect CT with MEOH/water as needed with the well SI. Coil Contingency Procedure Contingency #1: If at some point cement locks up and cannot be pumped into the IA then cut cement at surface, pull out of the retainer and lay cement in the tubing 1:1 maintaining whatever backside pressure has already been established. Consider reversing out the cement if the retainer appears to be holding. As long as the IA is shut-in the cement should stay in place as long as there is positive pressure on it at the leak (-350 psi or more at surface to be sure). POOH and FP tubing. 7 110 Fullbore • 1. Wait on Cement at least 5 days. 2. MIT-IA to 3000 psi. Coil 1. MU 3.80" OD junk mill. RIH and tag TOC/retainer (expected -10,400' MD). 2. Mill through retainer, cement, and the CBP. 3. Mill/Push CBP remnants through the tubing tail @ -10,520' MD & POOH. Slickline w/ Fullbore 1. Set 2-7/8" nipple reducer in SWN nipple @ 10,495' MD. 2. Load well with 5 bbl methanol spear, 200 bbls 1% KCL or seawater, and 38 bbls crude or diesel for FP. Max pressure 2500 psi. 3. Set TTP in nipple reducer. 4. Memory SCMT from T-tail to - 4000' MD find bottom and TOC in IA (expected TOC @ -5000' MD). Eline 1. Set 4-1/2" KB packer @ 6060' MD. Tie into SL memory caliper dated 03/20/2016. Slickline w/Fullbore 1. Sting into KB packer and set upper section of patch w/ ME @ -6035' MD (25' long patch). 2. MITT to 3000 psi. 3. Pull TTP. DHD 1. After Injection has stabilized, perform AOGCC witnessed MITIA to 2500 psi. Well Integrity Engineer 1. Add Quadrennial MITTs and MITIAs to AnnComm for additional monitoring of the well integrity. 8 TUBING SUMMARY -1 /k; POO1 #7 Date '5124193 WELL# P1-04 TUBING 4.5" 13CR80 NSCT i"I • r TUBING WT. 42.610 36.68'BKB TO BF ITEM ID , OD LENGTH TOP BOTTOM 4.112"WLEG, 9 Cr, NSCT 4.00 5.30) .98 10515.95 10516.93 _ PUP JT, 4-l.2",13 Cr, NSCT 3.96 5.00 20.05 10495.90 10515,95 4-112'SWN, NSCT,wi RHC Pt.UG, (3.8'3-):."'=3 75 5.23 1.27 10494.63 10495.90 A PUP JT,4-1;2",13 Cr, NSCT 3.96_ 5.00- 6.10 10488.53 10494.63 _ PUP JT,4-1;7,13 Cr, NSCT 3.96 5.00 10.20 10478.33 10488.53 Parker 4-112' SWS Nipple, NSCT, (3.813) 3.81 5.23 1.28 10477.05 10478.33 PUP JT,4-1!2",13 Cr, NSCT 3.96 5.00 20.03 10457.02 10477,05 ._ PUP JT,4-1,7,13 Cr, NSCT 3.96 5.00 6.10 10450.92 10457.02 Baker SABL 3 Packer. 7-5/8 x 4112 3.87 6.50 4.34 10446.58 10450.92 , Baker K-Anchor 3.87 5.50 .86 10445.72 10446.58 PUP JT, 4.1.7,13 Cr, NSCT 3.96 5-00 6.12 10439.60 10445.72 it 4-112" 12.64. 13Cr, NSCT Tbq (#1) 3.96 5.00, 39,47 10400.13 10439.60 PUP JT,4.1/7,13 Cr, NSCT 3.96 S.00 9.38 10390.75 10400.13 _ PUP JT,4-1!2",13 Cr, NSCT 3.96 5.0C' 9.35 10381.40 10390.75 Baker CMU Slkt rro Sleeve,4.112'NSCT 3.81 5.50 4.30 10377.10 10381.40 PUP JT, 4-1!2',13 Cr, NSCT 3.96 5 OC 6.10 10371.00 10377.10 jt 4.112" 12.60, 13Cr, NSCT Tbq (021 3.96 5.00 39.49 10331.51 10371.00 PUP JT, 4-1,7,13 Cr, NSCT 3.96 5.00 9.36 10322.15 10331.51 GLM, KBMG 4-112 x ',w;Dummy,BK latch 3.83 6.44 7.34 10314.81 10322,15 PUP JT,4-1,7.13 Cr, NSCT 3.96 5 OG 9.36 10305.45 10314.81 _ 56 its 4.112", 13Cr, Tub.ng (#3458) 3.96_ 5 OC 2201.36 8104.09 10305.45 PUP JT,4-112',13 Cr, NSCT 3.96 5-00 9.35 8094.74 8104.09 GLM, KBMG 4-112 x 1,w,'Dummy,BK latch 3.83 6.44_ 7.41 8087.33 8094.74 PUP JT, 4.1'2%13 Cr, NSCT 3-96 5.O0 9.35 8077.98 8087.33 83 its 4-112", 13Cr, Tbg (#59-4141) 3 96+ 5.00 3278.18 4799.80 8077.98 PUP JT, 4.1!2",13 Cr, NSCT 3.96 5.0C 9.36 4790.44 4799.80 GLM, KBMG 4-1/2 x 1.w1 Dummy,BK latch 3.83 6.44 7.35 4783.09 4790.44 PUP JT,4-112",13 Cr, NSCT 3.96 5.00 9.35 4773.74 4783.09 I 62 Its 4-1/2", 13Cr, Tbq (4142-0203} 3,96 5.00 2430.88 2342.86 4773.74 PUP JT,4-1/2'.13 Cr, NSCT 3.96" 5.00 9.36 2333.50 2342.86 FLOW COUPLING 4-112'NSCT an x FOX box, 3.83 5.25 r 5.62 2327.88 2333.50 CAMGO"1'RCF'SSSV-FOX 68P 3.81 6.38 6.68 2321.20 2327.88 FLOW COUPLING 4-1/2"FOX pin x NSCT box 3.83 5.25 5.27 2315.93 2321.20 PUP UT, 4-1/7,13 Cr, NSCT 3.96, 5.00 9.36 2306.57 2315.93 58 its 4-1/2". 13Cr, Tog (#204-#26'; 3.96 5 OC 2267.21 39.36 2306.57 X-O Pup,TDS Box x NSCT Pin 3.96 5.00 2.05 37.31 39.36 PUP JT, 4-1;2",13 Cr, TDS 3.96 5.00 2.33 34.98 37.31 FMC TUBING HANGER 3.96 10.86 .78 34.20 34.98 POOL 7 Rot.Tb)to Tbq Hqr LDS 34.20 34.20 .. 261 Its 4-1/2", 12.60, NT13CR-80, NSCT, R-3, Tubing 3 CAMCO 4-1/2" x 1" KBMG GLMs, w/Dummy, BK Latch I Up weight of tubing string 170,000# - Down weight of string 150,0004 ---- "" Control line Stainless Steel Bands 62 - PBTD _ 11511', TO 11600' i I i 9 • • CL) Qo O O O O CCN ) N 6) O I-- c- r--- 0 0 to V N. U N O O O O O co to r- co V m N V co CO 00 co co N toMOO LC) CO N CO CO CO C) CO Cl 1 1 1 1 1 I- LU O CO to CO CO CO CO CO O LO LO CO LU CO r' O t() LO LO COr IO r O C.) I I I 1 0/O 'Cr Ch CO � LO 0/ C CL o o 0 CL W co LU a) ' U U Z C'7 C co .N NLc5 co U OttNN _ O co CO co 10 T 'Cr CCNI D LC) p 0..) O O J r Z Z 0)O 00 ccaD < DD aC7 O O u_ pa Z zctOOm O D L Lt D U U) a. 0. I- • m N- LO 0) O CO Cr) tt N LO I- r N Ln N- CD CD CD Cr LU (p m COO CO LU N- COO `j O O LO O o I- N- CO C0 00 U) ) O) 0 0 00 00 CO CO CO CO C0 O O O) F a 0 CO CO r O 0) CO O tt N- LO t CO CO N- L() N- CO CD CD O) Ln a M N CO r -in U) L() N- O d' N- N- N- N- CO CO 0) O (p O O > CO CO CO CO O CO CO CO CO O 0 CUO 0 0 111 co j Z OJ 0_ 0 H Y U O m O O w Y Y tt a7 O) cmO N U S U U j W W y 0 0 r (V N (V M MCO Q Q W a a 0 Z CD 0 _U _U Z_U -1 W W O O Z Z O a1, Q Q Q = p Op o w U O O W Q O ~ 0 W W W D_ Q Q cof 2 2 2 0 (n co (n (n (n 4-0 I a-' a < o 2 y •:roCo00CD0LOLO CN N- N O r LC) O) CO LO O Q CD CD r r N N N CO CO CO . . . . . r r r- r03 r L LL _� U Y U O (n 2 2 2 O (~n (~n (a ai (an a 0 .2 U (/) ci) (/) ci) ci) ct) ci) roaa_ aaa_ aa. aa_ a Q mmmmmmmmmm 0 t a) a a; m co CO co CO co co co co CO O O O O O r r `- O O N N N N N N N N N N Z W Z W IQ a, CO CO CO CO CO CO CO CO CO CO Z ILI a U w W LL LLJ m 0 o D w -J Lu a J J 0 Q Q 0_ (n Li LL Lac. co a x a) E ns Z � tt � cl" ttvvv - 0 0 0 0O 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 LL 0_ (n O LL N Q' LL a_ a. aa_ a aa. a_ aa_ ¢ Q m m 0LL cocoa R • • Loepp, Victoria T (DOA) From: Loepp,Victoria T(DOA) Sent: Friday, March 09,2018 8:23 AM To: Carlisle, Samantha J (DOA) Subject: FW:Withdraw two additional sundries Sam, Please handle. I have placed the Sundries in your box. Thanx, Victoria From: Lastufka,Joseph N<Joseph.Lastufka@bp.com> Sent:Thursday, March 08,2018 4:02 PM To: Loepp,Victoria T(DOA)<victoria.loepp@alaska.gov> Cc:Worthington,Aras J<Aras.Worthington@bp.com> Subject: RE:Withdraw two additional sundries Victoria, Please also withdraw the following sundries: M-13A(PTD#201-165/Sundry#316-464) P1-04(PTD#193-063/Sundry#316-539) If you have any questions or need additional information, please let me know. Thank you, Joe Lastufka SIM Specialist Cell: (907) 227-8496 I Office: (907) 564-4091 Subsurface&Wens informaliort Maraver ent BP Exploration Alaska 1900 E. Benson Blvd. I Room: 778C I Anchorage, AK From: Loepp,Victoria T(DOA) (mailto:victoria.loepp@alaska.gov] Sent:Thursday, March 8,2018 2:20 PM To:Lastufka,Joseph N<Joseph.Lastufka()bp.com> Cc:Worthington,Aras J <Aras.Worthington@bp.com> Subject:Withdraw two additional sundries Please also withdraw: 1 P µ • • PBU M-13A(PTD 201-165,Sundry 316-464)Cement IA PBU P1-04(PTD 193-063,Sundry 316-539)Cement IA Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loepp(a�alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.Loeoo@alaska.gov From:Lastufka,Joseph N [mailto:Joseph.Lastufka@ bp.com] Sent:Thursday, March 08,2018 1:32 PM To: Loepp,Victoria T(DOA)<victoria.loepp@alaska.gov> Cc:Worthington,ArasJ<Aras.Worthington@bp.com> Subject: Please withdraw 3 sundries Victoria, Please withdraw the following unapproved IA Squeeze sundries: G-11B(PTD#208-027) 15-48C(PTD#211-030) Y-24(PTD#186-113) If you have any questions or need additional information please let me know. Thank you, Joe Lastufka SIM Specialist Cell: (907) 227-8496 I Office: (907) 564-4091 ,1 F '.;,4tip Subsurface&Wells infprmntton Man gerea nt BP Exploration Alaska I 900 E. Benson Blvd. I Room: 778C I Anchorage, AK 2 STATE OF ALASKA RECEIVED OLASKA OIL AND GAS CONSERVATION COMMI REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed OCT 1 1 2017 Abandon 0 Plug Perforations ❑ Fracture Stimulate 0 Pull Tubing ® pe do sh t'dow o 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing ® � i:J\JF'aram ❑ Plug for Redrill 0 Perforate New Pool 0 Repair Well M Re-enter Susp Well 0 Other:Scab Liner FZI 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number. 193-063 3. Address: P.O.Box 196612 Anchorage, Development ® Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-22366-00-00 7. Property Designation(Lease Number): ADL 028297 8. Well Name and Number: PBU P1-04 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY.PT MCINTYRE OIL 11.Present Well Condition Summary: Total Depth: measured 11600 feet Plugs measured None feet true vertical 9215 feet Junk measured 10567,11486 feet Effective Depth: measured 11511 feet Packer measured 10135,10447 feet true vertical 9136 feet Packer true vertical 8011,8248 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 74 20" 41-115 41-115 2300 520 Surface 3941 10-3/4" 39-3980 39-3551 4560 1730 Intermediate Production 11549 7-5/8" 37-11586 37-9202 8180/6890 5120/4790 Scab Liner 6409 5-1/2" 4001-10410 3566-8219 7740 6280 Perforation Depth: Measured depth: 11024-11460 feet True vertical depth: 8714-9091 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#x 3-1/2"9.2#13Cr85/13Cr80 34-10517 34-8302 Packers and SSSV(type,measured and 3-1/2"HES TNT Padcer 10135 8011 true vertical depth) 4-1/2"Baker SABL-3 Packer 10447 8248 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: SCANNED DEC 1 4 201 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 966 26800 2673 2428 2104 Subsequent to operation: 0 0 0 0 0 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations 0 Exploratory 0 Development Ea Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil ® Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 317-239 Authorized Name: Lastufka,Joseph N Contact Name: Leemhuis,Jacob Authorized Title: In rmatio %ta9roIle r Contact Email: Jacob.Leemhuis(8/bp.com Authorized Signature: Date: IQ/`'ill Contact Phone: +1 907 564 4989 Form 10-404 Revised 04/2017 VT!— 1& 1 / Submit Original Onty fo(`t�/(7� RBDrJ 3 \,'- CCI 1 L 2 i • Daily Report of Well Operations P1-04 ACTIVITYDATE SUMMARY T/I/O = SSV/500/0 TEMP = SI (PPPOT-T) PASS (PPPOT-IC) PASS (Pre RWO) PPPOT-T: Stung into test void 400 psi on void, bled void to 0 psi. Monitored for 10 min, no change in pressure. function all LDS, all moved freely. Pump through void, good returns. Pressure void to 5000 psi for 30 min test. Lost 100 psi in 15 min, lost 0 psi in second 15 min (PASS). bleed void to 0 psi. PPPOT-IC: Stung into test void 200 psi on void, bled void to 0 psi. Monitored for 10 min, no change in pressure. Function all LDS, 4 pins from front of well house going left where difficult to function, all other moved freely. Pump thorugh void, good returns. Pressure void 7/17/2017 to 3,500 for 30 min test. Lost 100 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled ****WELL S/I ON ARRIVAL****(RWO) TAG SSSV W/3.84" NO-GO CENTRALIZER @ 2,290' SLM, 2,321' MD. TAG SSSV& PICK OUT CLEAN W/2' 1-7/8" & 3.84" NO-GO CENT, 2' 1-7/8", 3.69" CENT, XO, 5' 1-1/2" & FLAPPER CHECKER (101" no-go to pins, pins= 3.50" long) @ 2,290' SLM, 2,321' MD. PULL PXN PRONG FROM 10,450' SLM. PULL 4-1/2" PXN PLUG BODY FROM 10,454' SLM, 10,495' MD. DRIFT W/KJ, XO, 2.50" CENT, XO, 4-1/2" TBG END LOCATOR, XO & 1-1/2" S.BAILER. LOC TT @ 10,473' SLM, 10,500' ELMD (+27' CORR). TAG STICKY BOTTOM @ 11,418' SLM, 11,445' ELMD (15' OF FILL). 7/22/2017 ****JOB CONTINUED ON 7/23/17**** ****JOB CONTINUED FROM 7/22/17****(RWO) RUN BP TANDEM SBHPS GAUGES ACCORDING TO PROGRAM (good data). DRIFT W/KJ, 2' 1-7/8" & 3.70" CENT, UNABLE TO MAKE IT PAST 5,171' SLM. DRIFT W/KJ, 4-1/2" BRUSH & 3.50" G. RING, UNABLE TO MAKE IT PAST 5,194' SLM. PERFORM B&F FROM SURFACE & OUT TT W/3.00" G. RING TO 10500' SLM (no issues) 7/23/2017 ***CONT. ON 07/24/17 WSR*** T/I/O= 2880/2880/28. (LRS Unit 76:Assist Slickline: Brush and Flush) Pumped 10 bbls of methanol followed by 90 bbls of 180* HOT crude down the tbg to assist SLB with B&F. 7/23/2017 ***WSR continued on 7-24-17*** **WSR continued from 7-23-17** (LRS Unit 76-Assist Slickline: Brush and Flush) Pumped 34 bbls of crude down the tbg to assist SLB. Slickline still on well upon departure. 7/24/2017 FWHP=1705/2908/4 T/I/0=1817/2800/27. Assist E line with load. Pumped 3 bbls of neat methanol, followed by 160 bbls of 9.8 brine down IA. MIT-OA**PHASED**to 1092 psi. Max applied pressure = 1203 psi. Target pressure = 1080 psi. Pumped 3.7 bbls diesel down OA to reach test pressure. 15 min OA lost 71 psi. 30 min OA lost 20 psi. Total loss of 91 psi in 30 mins. Bled 7/24/2017 OAP back to 36 psi. Bled back 2 bbls. T/I/0=1817/2800/27. (LRS Unit 76 -Assist Eline: Load TBG & IA, MIT-OA) Pumped 3 bbls of neat methanol, followed by 160 bbls of 9.8 brine down IA. MIT-OA**PASSED** to 1092 psi. Max applied pressure = 1203 psi. Target pressure = 1080 psi. Pumped 3.7 bbls diesel down OA to reach test pressure. 15 min OA lost 71 psi. 30 min OA lost 20 psi. Total loss of 91 psi in 30 mins. Bled OAP back to 36 psi. Bled back 2 bbls. Test pressure did not equal differential pressures at surface, but could not bleed IA due to TxIAxPC leak. 7/24/2017 **** Job continued on 07/25/17 **** • S Daily Report of Well Operations P1-04 ***JOB STARTED 25-JUL-2017***(SLB ELINE CBP/PUNCH/CUT) ARRIVE ON LOCATION. STAND BY FOR LRS. SPOT EQUIPMENT. LTI PASSED. T/I/O = 1900/2500/0. STAND BY FOR WIND. RIG UP. 7/24/2017 ***JOB CONTINUED 25-JUL-2017*** ***CONT. FROM 07/23/17 WSR*** (RWO) DRIFT W/4-1/2" BRUSH & 3.50" G. RING OUT TT, STOP @ 10500' SLM (no issues) DRIFT W/4-1/2" BRUSH & 3.805" G. RING, TAG XN @ 10470' SLM (no issues) LRS PUMP 34 BBLS ADDITONAL CRUDE DOWN TBG. 7/24/2017 ***WELL LEFT SHUT IN, DSO NOTIFIED*** *** Job continued from 07/24/17 *** Pumped 5 bbls of Meth down IA, followed by 160 bbls of 9.8 Brine, cap IA with 3 bbls of DSL. Pumped a total of 5 bbls Meth down the TBG, followed by 260 bbls 9.8 Brine, cap tbg with 2 bbls DSL. Pumped 10 bbls neat methanol. followed by 170 bbls of 180*crude down tbg. E line running in hole during hot. Pumped 285 bbls 9.8 brine down tbg to load. Cap tbg 7/25/2017 with 2 bbls of diesel. E line hanging below tbg tail ***JOB CONTINUED FROM 24-JUL-17***(SLB ELINE CBP/PUNCH/CUT) LRS PUMPS 160 BBL'S DOWN THE IA AND 260 BBL'S DOWN THE TBG OF 9.8 PPG BRINE. RUN1: RIH W/ HEAD/EQF-43/UPCT/BKR-10/4.5"WEATHERFORD CBP. SET DOWN AT 5144', UNABLE TO PICK UP. ABLE TO SLOWLY WORK BACK TO SURFACE BY PUMPING NEAT METHANOL AND OVERPULLING. INSPECT TOOLS AT SURFACE, SOME PARAFFIN ON THE PLUG. CLEAN OFF THE PARAFFIN AND STAB BACK ON. LRS PUMPS 10 BBL'S OF NEAT METH AND 50 BBL'S OF 180*F CRUDE AT 1 BBL/MIN. RUN2: RIH W/ HEAD/EQF-43/UPCT/BKR-10/4.5" WEATHERFORD CBP WHILE LRS CONTINUES TO PUMP CRUDE AT 1 BBL/MIN. NO ISSUES PASSING 5100'. DROP BELOW THE TBG TAIL AND LRS LOADS THE TBG W/290 BBL'S OF 9.8 PPG BRINE. PU TO CBP SETTING DEPTH = 10430' (MID-ELEMENT). PLUG APPEARS TO SET, BUT NOT SHEAR OFF. UNABLE TO PULL OFF. CONTACT BP/SLB MANAGEMENT. WORK TOOLS, PULL OFF OF WEAKPOINT AT 2600 LBS SURFACE TENSION. SEE FISHING REPORT AND LOG FOR TOOLSTRING DETAILS. ALL LOGS CORRELATED TO 4-1/2"TUBING TALLY DATED 5/24/93. 7/25/2017 POOH, RDMO. FINAL T/I/O = 30/1000/20. ***Job continued from 07/24/17 *** (LRS Unit 76 -Assist Eline: Load TBG) Pumped 5 bbls of Meth down IA, followed by 160 bbls of 9.8 Brine, cap IA with 3 bbls of DSL. Pumped 5 bbls Meth down the TBG, followed by 260 bbls 9.8 Brine, cap tbg with 2 bbls DSL. Eline ran into obstruction. Pumped 10 bbls neat methanol. followed by 170 bbls of 180* HOT crude down tbg while Eline ran in hole. Once Eline out of tubing tail, Pumped 285 bbls 9.8 brine down tbg to load. Cap tbg with 2 bbls of diesel. End job due to E.Line problems. SV/WV/SSV/MV= E.LINE. IA/OA= OPEN 7/25/2017 FWHP:20/1300/100 T/I/O = 150/1250NAC. Temp = SI. IA FL (E-line req). No AL. IA has an integral installed =inspection not current. IA FL @ 3200' (84 bbls). 7/26/2017 SV, WV, SSV = C. MV = O. IA, OA= OTG. 08:45 • • Daily Report of Well Operations P1-04 ***WELL S/I ON ARRIVAL*** (Fish) FISH COMPLETE E-LINE TOOLSTRING /SETTING TOOL OFF WFD CBP AT 10,430' ELM. SETTING TOOL SHEAR SCREWS SHEARED (Possible friction bite) &APPEARS CBP IS SET. CURRENTLY RIH W/3.65" CENT, 3.25" BLIND BOX TO TAG 4-1/2"WFD CBP. 7/28/2017 ***JOB IN PROGRESS, CONTINUED ON 7/29/17 WSR*** ***CONTINUED FROM 7/28/17 WSR*** (Fish) TAG 4-1/2"WFD CBP W/3.65" CENT, 3.25" BLIND BOX AT 10,399' SLM / 10,430' ELM. 7/29/2017 ***WELL S/I ON DEPARTURE, NOTIFIED DSO OF WELL STATUS*** ***JOB STARTED ON 06-AUGUST-2017***(SLB ELINE TUBING CUT/CIS: POLLARD RCT CUTTER) WELL SHUT IN UPON ARRIVAL. RU. PT. RUN 1: RIH W/5'x 1.56" PUNCHER/MPD AND ILE, SMALL, MEDIUM AND LARGE CHARGES, 4 SPF. PUNCH 4.5" TUBING FROM 10398' - 10403'. CCL TO TOP SHOT = 5.6", CCL STOP DEPTH = 10392.4". GOOD INDICATION OF SHOT. POOH. RIH W/2.5" POLLARD RCT CUTTER. CUT 4.5"TUBING AT 10405', CCL TO CUTTER = 13.5', CCL STOP DEPTH = 10391.5'. GOOD INDICATION OF CUT. POOH. LOGS CORRELATED 4.5" TUBING TALLY DATED 24-MAY-1993. RDMO. HAND OVER RAP. NOTIFY PAD OP ON DEPARTURE. WELL SHUT IN ON DEPARTURE. 8/6/2017 ***JOB COMPLETE ON 06-AUGUST-2017*** T/I/0=330/1270/10 Temp= S/I Load IA(Pre RWO) Pumped 9 bbls of 50/50 meth followed by 276 bbls of 9.8 ppg NaCI down IA to load. Pumped 3 bbls diesel down IA to cap. RDMO. Hung info tag on IA, AFE sign on MV. SWAB/SSV/WV= Closed MV=Open IA/OA= OTG. DSO notified of LRS departure. 8/10/2017 FW H P's=700/350/490 ***WELL S/I ON ARRIVAL***(rwo expense) RAN 3.84" NOGO TO TRSV AT 2298' SLM. SET 4 1/2" (108" OAL) NORTHERN SOLUTIONS HOLD OPEN SLV (2.834" Min ID) IN TRSV AT 2298' SLM (2321' MD) 8/14/2017 ***WELL LEFT S/I ON DEPARTURE, DSO NOTIFIED OF STATUS*** T/I/O= 400/200/0 PreParker 272 - Set BPV#152, ND 4" CIW Upper Tree, Installed 4" CIW HWO Temp #83 to MV for dry hole conversion, Torqued to API Specs, PT'd to 5000 psi, Removed drilling scaffold, Installed 2" CIW HWO PB on IA Temp#72 with intrgal flange and cap -Torqued to API Specs, PT'd to 3500 psi, Installed 2" CIW HWO PB on OA Temp #96 with intrgal flange and cap -Torqued to API Specs. Pt'd to 3500 psi. RDMO ***Job 8/14/2017 Complete*** FWP=BPV/10/0 T/I/O = BPV/220/0+. Temp = SI. TBG & IA FL's (Pre rig). No AL, wellhouse, flowline or scaffolding. Dry-hole tree and BPV installed. IA FL @ 850' (22 bbls). 8/31/2017 CV, MV = ?. IA, OA= OTG. 1220 hrs. T/I/O = 410/240/0+. Temp = SI. Bleed TP & IAP to 0 psi (pre RWO). Wellhouse, AL, flowline, scaffold removed. Dryhole tree & rig scaffold installed. T FL @ 1030' (16 bbls). IA FL @ 880' (24 bbls). Bled IAP to BT from 240 psi to 0 psi in 45 min (all gas). During bleed TP decreased 10 psi. Bled TP to BT from 400 psi to 140 psi in 15 min (FTS). No monitor after bleed. 9/7/2017 LRS in control of valves upon departure. 23:59 T/I/O= BPV/480/0. Barriers= MV x SV. Both 23.25 turns. Removed BPV#152 @80" . RDMO***Job Complete*** SEE LOG FOR DETAILS. Final T/I/O= 480/480/0. Note: Drilling 9/7/2017 scaffold is on well • • Daily Report of Well Operations P1-04 T/I/O= 150/110/11 Temp= NO FL. Load TBG and IA with 9.8 NaCl brine. Pre-Rig. ***job 9/7/2017 continued to 9/8/2017. T/I/O =Vac/150/30. Temp = SI. T & IA FL (Pre rig). No AL, wellhouse, or flowline. Dry hole tree & rig scaffold installed. T FL near surface. IA FL @ 840' (22 bbls). 9/8/2017 SV, MV= C. IA, OA= OTG. 1345 hrs. ***WSR continued from 9/7/2017 (Pre-Rig) Pumped 5 bbls of ambient 60/40 meth followed by 330 bbls of 90* 9.8 NaCI brine to load TBG. Pumped 5 bbls of ambient 60/40 meth followed by 200 bbls of 90* 9.8 NaCI brine to load IA. FWHP= 60/104/550 Pressures still falling as we rigged down. Valves, as found upon 9/8/2017 arrival: swab, master= closed IA, OA= open to gauge *NO SSV • • North America-ALASKA-BP Page 1 of 21 A Operation Summary Report Common Well Name:P1-04 AFE No Event Type:WORKOVER(WO) Start Date:9/9/2017 End Date: X4-014DC-E:(4,686,000.00) Project:Point McIntyre Site:Pt Mac 1 Rig Name/No.:PARKER 272 Spud Date/Time:5/11/1993 12:00:00AM Rig Release:9/23/2017 Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001752 Active datum:7:04 5/11/1993 00:00(r450.40usft(above Mean Sea Level) Date From-To I Hrs Task Code NPT Total Depth Phase Description of Operations (hr)— -l-- (usft) — I 9/9/2017 00:00 - 03:30 3.50 RIGD P r PRE GENERAL RIG DOWN I -SKID RIG FLOOR I I -LAY OVER DERRICK(430 KLBS) -SEPERATE MODULES AND STAGE IN '.PREPERATION FOR MOVE 03:30 - 09 001 5.50 INTMOB P PRE j MOVE RIG MODULES FROM B PAD ALONG i SPINE ROAD TO K PAD ACCESS ROAD 09:00 - 00.00 15.00 ; INTMOB N PRE I ROAD BEGINS TO DETERIORATE BETWEEN : • E-PAD AND K-PAD I UTILITY MODULE ABLE TO CONTINUE MOVING FORWARD TO WIDE SPOT IN ROAD I 1/2 MILE PAST K-PAD I DRILL MODULE BROKE THROUGH ROAD 1/4 I MILE PAST E-PAD JACK TIRES UP AND ADD WOOD CRIBBING I BELOWTIRES TO GET MODULE OFF GROUND -MOBILIZE ADDITIONAL RIG MATS IN FRONT AND BEHIND DRILL MODULE -ABLE TO GET DRILL MODULE FORWARD �ouTOFRUTS 1-HAUL IN GRAVEL TO FILL RUTS 1 -BEGIN LAYING MATS TO BACK DRILL MODULE BACK TO E-PAD I ? MUD MODULE TORE UP ROAD ATTEMPTING TO BACK UP TO E-PAD I-MOVE MUD MODULE FORWARD OUT OF ' 1 IRUTS '-FILL IN RUTS WITH GRAVEL AND LAY MATS BACK TO E-PAD I-BACK MUD MODULE BACK TO E PAD AND !STAGE OUT OF WAY WHILE FIXING ROAD I :AND LAYING MATS FOR DRILL MODULE TO 1 i BACK UP 9/10/2017 100:00 - 06:00 6.00 INTMOB N I PRE LAY MATS BETWEEN RIG AND E-PAD 06:00 - 08:00 2.00 INTMOB N PRE MOVE RIG BACK TO E-PAD FROM WHERE IT i BROKE THROUGH THE ROAD 08:00 - 23:00 15.00 INTMOB N I PRE LAY RIG MATS BETWEEN E-PAD AND 1 STAGING AREA(WIDE SPOT IN ROAD)PAST 1K-PAD 123:00 - 00:00 1.00 INTMOB N PRE I MOVE RIG FROM E-PAD TOWARDS STAGING f AREA PAST K-PAD 9/11/2017 00 00 - 02:00 2.00 INTMOB N ' PRE 'CONTINUE MOVING RIG FROM E-PAD TO 1 -4 _ STAGING AREA PAST K PAD 02:00 - 18:00 16.00 INTMOB N PRE I LAY RIG MATS BETWEEN STAGING AREA _ PAST K-PAD AND WEST DOCK ROAD • :18:00 - 20:00 2.00 INTMOB N PRE I MOVE DRILL MODULE AND MUD MODULE 1 FROM STAGING AREA PAST K-PAD TO WEST I __ �— + I DOCK STAGING AREA 20:00 - 00:00 4.00 INTMOB N PRE I PICK UP RIG MATS FROM K PADACCESS I .� I ROADAND LAY MATS ON PM1 ACCESS ROAD 9/12/2017 00:00 - 15:00 15.00 I INTMOB N 1 PRE 'CONTINUE TO PICK UP RIG MATS FROM 1K-PAD ACCESS ROAD AND LAY MATS ON PM1 1 1 1 I ACCESS ROAD Printed 10/2/2017 1.50:09PM *AII depths reported in Workover Depths* • North America-ALASKA-BP • Page 2 of 21 Operation Summary Report Common Well Name:P1-04 AFE No Event Type:WORKOVER(WO) Start Date:9/9/2017 End Date: X4-014DC-E:(4,686,000.00) Project:Point McIntyre Site:Pt Mac 1 Rig Name/No.:PARKER 272 Spud Date/Time:5/11/1993 12:00:O0AM Rig Release:9/23/2017 Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001752 Active datum:7:04 5/11/1993 00:00 @50.40usft(above Mean Sea Level) Date From-To Hrs Task Code I NPT Total Depth Phase I Description of Operations — (hr) (usft) 15:00 - 17:30 2.50 INTMOB N T PRE I MOVE RIG FROM WEST DOCK STAGING AREA TO PM1 17:30 - 21:00 3.50 INTMOB P PRE SPOT RIG OVER WELL P1-04,PLUG IN ELECTRICAL INTERCONNECTS BETWEEN 1,MODULES 21:00 - 00:00 3.00 RIGU P PRE GENERAL RIG UP OPERATIONS -RAISE DERRICK(530 KLBS) 1-SKID RIG FLOOR 1-INSTALL WALKWAYS AND HANDRAILS ON ROOF -RIG UP TONGS AND MANRIDERS 1-RIG UP INTERCONNECTS BRIDLE DOWN AND RIG UP TOP DRIVE TO BLOCKS 9/13/2017 100:00 - 04:00 4.00 RIGUPRE CONTINUE GENERAL RIG-UP OPERATIONS P -SPOT CUTTINGS BOX AND TIGER TANK I-RIG UP HARDLINE AND CHOKE MANIFOLD 1-RIG UP RIG FLOOR,CIRCULATING LINES AND EQUIPMENT -TAKE ON FLUID TO PITS AND CALIBRATE 1 TOTCO SYSTEM i ACCEPT RIG AT 04:00 AM ON 9/13/17 04:00 05:00 1.00 RIGU P PRE i HOLD H2S RIG EVACUATION DRILL WITH AFTER ACTION REVIEW.HOLD PRE-SPUD WITH CREW IN CONFERENCE ROOM. 05:00 06:00 1.00 DHB P PRE 1 RIG UP LUBRICATOR TO TREE AND PRESSURE TEST TO 3500 PSI HIGH FOR 5 • MIN -TEST PASSES ACCORDING TO ACCEPTANCE CRITERIA4A IN SECTION 6 OF WELL PROGRAM 06:00 - 07:00 1.00 DHB . P PRE PULL BPV PER DSM REP.RIG DOWN _ LUBRICATOR. 107:00 - 09:30 2.50 DHB P PRE i ROCK OUT DIESEL FREEZE PROTECT WITH II HEATED 9.8 PPG BRINE TO ESTABLISH KILL-WEIGHT FLUID AS BARRIER(KNOWN CRETACEOUS LEAK IN 7-5/8"CASING AT -6050'MD) 1-RIG UP CIRCULATING LINES TO TREE PRESSURE TEST SURFACE LINES AND HARDLINE TO TIGER TANK TO 3500 PSI (PASSING TEST ACCORDING TO ACCEPTANCE CRITERIA4A IN SECTION 6 OF I WELL PROGRAM) -REVERSE CIRCULATE DIESEL FROM TUBING UNTIL CLEAN BRINE IS OBSERVED AT TIGER TANK(6 BPM,900 PSI) -CIRCULATE DOWN TUBING TAKING RETURNS FROM IA UNTIL CLEAN BRINE IS OBSERVED AT TIGER TANK(6 BPM,1350 PSI) -FLOW CHECK WELL FOR 15 MIN TO I CONFIRM KILL-WEIGHT FLUID BARRIER (STATIC) - - 09:30 - 10:00 0.50 DHB P PRE 1RIG UP LUBRICATOR TO TREE AND I PRESSURE TEST TO 3500 PSI HIGH FOR 5 I MIN -TEST PASSES ACCORDING TO 1 ACCEPTANCE CRITERIA 4A IN SECTION 6 OF WELL PROGRAM Printed 10/2/2017 1:50:09PM *All depths reported in Workover Depths* North America-ALASKA-BP • Page 3 of 21 Operation Summary Report Common Well Name:P1-04 AFE No Event Type:WORKOVER(WO) Start Date:9/9/2017 End Date: X4-014DC-E:(4,686,000.00) Project:Point McIntyre Site:Pt Mac 1 Rig Name/No.:PARKER 272 Spud Date/Time:5/11/1993 12:00:00AM Rig Release:9/23/2017 Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001752 Active datum:7:04 5/11/1993 00:00 @50.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 10:00 - 11:00 1.00 DHB P ! PRE I SET BPV PER DSM REP.RIG DOWN LUBRICATOR. 11:00 12:00 1.00 DHB P PRE - ;PERFORM ROLLING TEST FROM BELOW ON BPV TO 500 PSI PER WELL PROGRAM(PASS) -FLOW CHECK WELL AFTER TEST,WELL ON 1A VAC 12:00 - 15:00 3.00 BOPSUR P PRE I NIPPLE DOWN TREE AND ADAPTER FLANGE. INSTALL BLANKING PLUG. BLEED HANGER VOID TO 0 PSI 1-INSTALL BULL PLUG IN CONTROL LINE PORT ON TUBING HANGER I-INSPECT WELLHEAD, FUNCTION 1 LOCKDOWN SCREWS AND GLAND NUTS -INSPECT HANGER THREADS,AND INSTALL CROSSOVER AND BLANKING PLUG(8 TURNS) !-MAKE UP BLANKING PLUG CROSSOVER(9 TURNS TO LEFT TO MAKE UP) !BARRIERS FOR BREAKING CONTAINMENT -TUBING SIDE:TESTED BPV AND 9.8 PPG KWF 1-IASIDE:TUBING HANGER SEALS(TESTED ITO 5000 PSI PRE-RIG)AND 9.8 PPG KWF t-CONTINUOUSLY FEED IA WITH 9.8 PPG 1 BRINE WITH CHARGE PUMP AFTER !COMPLETION OF ROLLING TEST;ENSURE IA IS FULL TO USE AS BARRIER.LOSS RATE_ 15-10 BPH. 15:00 - 17.00 2.00 BOPSUR P PRE INSTALL BOPE AND HIGH PRESSURE RISER WITH CONFIGURATION PER LEVEL 3 OCN#1: -ANNULAR PREVENTER -3-1/2"X 5-1/2"VBRS IN UPPER RAM CAVITY -BLIND/SHEAR RAMS -MUD CROSS 1-3-1/2"X 5-1/2"VBRS IN LOWER RAM CAVITY 17:00 - 18:00 1.00 BOPSUR P I i PRE I RIG UP FOR BOPE TEST I-MAKE UP 5-1/2"TEST JOINT AND INSTALL ON BLANKING PLUG -AIR OUT LINES FOR TESTING -REVIEW PRESSURE CROSS CHECK PRIOR TO PRESSURE TEST 18:00 - 00:00 8.00 BOPSUR li N PRE ATTEMPT TO PERFORM SHELL TEST TO 3500 PSI ON BOPE AND OBSERVE PRESSURE BLEEDING OFF.TROUBLESHOOT LEAK POINT. i-CHECKED SURFACE LINES AND VERIFIED 1 NO LEAKS 1-RE-TORQUED LOCK DOWN SCREWS I-OBSERVED BUBBLING AIR IN STACK THAT 1 CORRESPONDED WITH CHARGE PUMP 1 FILLING IA.BUBBLING SUBSIDED WHEN I CHARGE PUMP WAS SHUT OFF.(VERIFIED i BUBBLING WAS NOT GAS WITH GAS 1DETECTOR). -TROUBLESHOOT POTENTIAL LEAK POINTS: TUBING HANGER SEALS,BPV AND BLANKING PLUG,CONTROL LINE PORTS 1-DISCUSS PATH FORWARD WITH ODE, SENIOR COMPLETION ENGINEER AND WSUP: DECISION MADE TO PULL BLANKING PLUG, INSPECT AND RE-SET(BLANKING PLUGS HAVE LEAKED ON PAST WELLS) Printed 10/2/2017 1:50:09PM *All depths reported in Workover Depths" NorthAnietisa-ALASKA-SP Ne 4011 Common Well Name:P1-04 AFE No Event Type:WORKOVER(WO) Start Date:9/9/2017 End Date: X4-014DC-E:(4,686,000.00) Project:Point McIntyre Site:Pt Mac 1 Rig Name/No.:PARKER 272 Spud Date/Time:5/11/1993 12:00:00AM Rig Release.9/23/2017 Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001752 Active datum:7:04 5/11/1993 00:00 @50.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 9/14/2017 00:00 - 06:00 6.00 BOPSUR N PRE CONTINUE TROUBLESHOOTING LEAK PATH FOR BOPE TEST -PULL BLANKING PLUG,CHANGE OUT BALL I AND RE-GREASE I-RESET BLANKING PLUG AND ATTEMPT TO TEST BOPE,TEST DID NOT PASS(BLEED-OFF SLOWER THAN INITIAL TESTS;1000 PSI IN 5-10 MIN ON THESE TESTS VS.1000 PSI IN 3 MIN ON PRIOR TESTS) -CONFIRMED COMMUNICATION BETWEEN IA CHARGE PUMP(-100 PSI APPLIED PRESSURE)AND STACK -MAKE UP TEST JOINT TO BLANKING PLUG (NO PORTED SUB)AND PRESSURE TEST TO 3500 PSI(PASS).TEST CONFIRMS BLANKING PLUG IS NOT THE LEAK PATH. -CONTACT ODE AND WSUP TO DISCUSS PLAN FORWARD Printed 10/2/2017 1:50.09PM *AII depths reported in Workover Depths* eNorth America-ALASKA-BP • Page 5 or 21 Operation Summary Report Common Well Name:P1-04 AFE No Event Type:WORKOVER(WO) Start Date:9/9/2017 End Date: X4-014DC-E:(4,686,000.00) Project:Point McIntyre Site:Pt Mac 1 Rig Name/No.:PARKER 272 Spud Date/Time:5/11/1993 12:00:OOAM Rig Release:9/23/2017 Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001752 Active datum:7:04 5/11/1993 00:00 @50.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth ' Phase Description of Operations (hr) (usft) 06:00 - 00:00 18.00 BOPSUR N PRE FORMULATE PLAN FORWARD WITH ANCHORAGE ENGINEERING AND OPERATIONS TEAM PARTICIPATE IN PLANNING AND RISK ASSESMENT MEETING;IN ATTENDANCE: CARLOS SCHIAVENATO(WSUP),GREG SARBER(SWSL AND WEEKEND WSUP 'DELEGATE),LOUIS ROMO(WOM),BLAIR NEUFELD(SWSL),DAVID MINGE(RIG ENGR.), BILL ISAACSON(DEM),JOHN EGBEJIMBA (ETL),DAVE BJORK(SCE),DAN BLYDENBURGH(PARKER AREA SUP),JACOB j LEEMHUIS(ODE),OLIVER STERNICKI(WELL INTEGRITY ENGR.) -HIGH LEVEL PLAN FORWARD(KWF AS I SINGLE BARRIER):PERFORM ROLLING, LEAK-TIGHT TEST ON BOPE TO 3500 PSI, FUNCTION TEST RAMS,PULL BLANKING PLUG,PULL BPV WITH TESTED LUBRICATOR, ' PULL HANGER TO FLOOR AND CIRCULATE 'BOTTOMS UP THROUGH CHOKE MANIFOLD, LAY DOWN TUBING HANGER AND HANG OFF REMAINDER OF TUBING STRING ON TEST PLUG,PERFORM FULL BOPE TEST,PULL REMAINDER OF TUBING -APPLY FOR AOGCC APPROVAL TO PERFORM ROLLING TEST ON BOPE AND PULL TUBING WITH SINGLE BARRIER. APPROVAL GRANTED BY AOGCC SENIOR PETROLEUM ENGINEER AT 2:17 PM ON 9/14/17 -APPROVAL GRANTED FOR DEVIATION FROM BP PRACTICE 100222 CLAUSE 5.1.D (11:37 PM ON 9/14/17)WHICH STATES "ONSHORE WELLS SHALL HAVE A PRIMARY AND SECONDARY WELL BARRIER THROUGH ' EACH PHASE OF THE WELL LIFE CYCLE AFTER INSTALLING BOPS AND DRILLING OUT SURFACE CASING..."SEE EMOC#10357 FOR FURTHER DETAILS FULL,DETAILED PROCEDURE ' DOCUMENTED IN LEVEL 3 OCN#2,FINAL DECIDE AND APPROVAL TO PROCEED RECEIVED AT 2:27AM ON 9/15/17 SIMOPS: -BUILD 4"DRILL PIPE STANDS OFFLINE -LOAD PIPE SHED WITH 5-1/2"LINER -SWAP 5"JOINT IN STACK FOR 5-1/2"TEST JOINT PERFORM THE FOLLOWING PRESSURE TESTS OFFLINE:CHOKE MANIFOLD,UPPER AND LOWER IBOPS,HT-38 DART VALVE AND 2 X FOSV,NC50 DART VALVE AND 2 X FOSV -CLEAN AND PAINT AROUND RIG -GREASE AND OIL CHAIN ON PIPE CAT -GREASE WELL CENTER AND OFFLINE ST-80 LOSS RATE=2-4 BPH THROUGHOUT DAY Printed 10/2/2017 1.50:09PM *All depths reported in Workover Depths* ' e North cam 110, PiVetof 21 Own Summary Report Common Well Name:P1-04 AFE No Event Type:WORKOVER(WO) Start Date:9/9/2017 End Date: X4-014DC-E:(4,686,000.00) Project:Point McIntyre Site:Pt Mac 1 Rig Name/No.:PARKER 272 Spud Date/Time:5/11/1993 12:00:00AM Rig Release:9/23/2017 Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001752 Active datum:7:04 5/11/1993 00:00 @50.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 9/15/2017 00:00 - 01:30 1.50 BOPSUR N PRE FORMULATE PLAN FORWARD WITH ANCHORAGE ENGINEERING AND OPERATIONS TEAM -CONTINUE PERFORMING SIMOPS AROUND THE RIG,SEE DETAILS IN PREVIOUS TIME ENTRY -LOSS RATE=2 BPH -RECEIVE LEVEL 3 OCN WITH"AGREE" FROM DEM,ETLAND ACTING WSUP 01:30 - 02:30 1.00 BOPSUR r N PRE HOLD PRE-JOB SAFETY MEETING WITH CREW IN CONFERENCE ROOM DISCUSS RISK ASSESSMENT -WALK THROUGH PROCEDURE IN OCN STEP-BY-STEP '-DISCUSS WELL CONTROL RESPONSE, INDIVIDUAL ROLES AND RESPONSIBILITIES -RECEIVE LEVEL 3 OCN"DECIDE"FROM WOM AT 2:27 AM 02:30 - 03:30 1.00 BOPSUR I N PRE PERFORM ROLLING TEST ON BOP,HIGH PRESSURE RISER AND WELLHEAD TOP � I FLANGE TO 250 PSI LOW FOR 5 MIN/3500 PSI HIGH FOR 10 MIN -TEST WITH 5-1/2"TEST JOINT AND CLOSED IANNULAR PREVENTER 1-USE TEST PUMP REGULATOR TO MAINTAIN PRESSURE MONITOR IA PRESSURE(MAX ALLOWABLE IA PRESSURE PER OCN=700 PSI).IA PRESSURE NEVER INCREASED ABOVE 125 PSI -SHUT OFF TEST PUMP AND LEAVE PRESSURE ON BOPE TO CHECK PRESSURE FALLOFF:20 PSI IN 5 MIN -DUE TO IMPROVEMENT IN PRESSURE FALLOFF,PRESSURE UP AGAIN:FALLOFF OF 250 PSI IN 6 MINUTES -NOTIFY ODE OF RESULTS OF ROLLING TEST 03:30 - 04:30 1.00 BOPSUR N PRE FUNCTION TEST ALL BOP RAMS,LAY DOWN TEST JOINT 04:30 - 05:30 1.00 BOPSUR N PRE RIG UP DUTCH RISER AND LUBRICATOR AND PRESSURE TEST TO 250 PSI LOW FOR 5 MIN /3500 PSI HIGH FOR 10 MIN PRESSURE FALLOFF OF 30 PSI IN FIRST 5 MIN,20 PSI IN SECOND 5 MIN -ROLLING TEST NOT REQUIRED TO KEEP PRESSURE ABOVE 3500 PSI -CONTACT WSUP AND MAKE DECISION TO ATTEMPT CONVENTIONAL BOPE TO ESTABLISH SECOND BARRIER -RIG DOWN DUTCH RISER AND LUBRICATOR 05:30 - 06:00 0.50 BOPSUR N PRE ATTEMPT TO PRESSURE TEST BLIND RAMS AGAINST BLANKING PLUG TO 250 PSI LOW/ 3500 PSI HIGH FOR 5 MIN EACH -LOW TEST PASSES,HIGH TEST FAILS(200 PSI LOST IN 10 MIN,NO STABILIZATION) -RIG DOWN TESTING EQUIPMENT,PROCEED ACCORDING TO LEVEL 3 OCN#2 Printed 10/2/2017 1.50:09PM *AII depths reported in Workover Depths* 111 North America-ALASKA-BP Ilk Page,7 of 21 Operation Summary Report Common Well Name:P1-04 AFE No Event Type:WORKOVER(WO) Start Date:9/9/2017 ' End Date: 1X4-014DC-E:(4,686,000.00) Project:Point McIntyre ' Site:Pt Mac 1 Rig Name/No.:PARKER 272 , Spud Date/Time:5/11/1993 12:00:00AM Rig Release:9/23/2017 Rig Contractor.PARKER DRILLING CO. .BPUOI:USA00001752 Active datum:7:04 5/11/1993 00:00 6150.40usft(above Mean Sea Level) Date From-To Hrs i Task Code NPT Total Depth Phase I Description of Operations (hr) I (usft) I 06:00 - 09:00 3.00 - BOPSUR N PRE PULL BPV WITH LUBRICATOR AS FOLLOWS: I -RIG UP DUTCH RISER AND LUBRICATOR, PRESSURE TEST AGAINST BLANKING PLUG TO 3500 PSI FOR 10 MIN(ROLLING PUMPS j NOT REQUIRED).PASSING TEST. '-REMOVE LUBRICATOR AT QUICK-TEST SUB, ,STAND BACK -PULL BLANKING PLUG WITH PULLING TOOL -MAKE UP LUBRICATOR AND PRESSURE (TEST TO 3500 PSI FOR 5 MIN AT QUICK-TEST SUB -PULL BPV PER DSM -RIG DOWN LUBRICATOR --- — -RIG DOWN DUTCH RISER 09:00 - 10:30 1.50 PULL P -- DECOMP RIG UP TO PULL TUBING,MAKE UP 4-1/2" I SPEAR AND GRAPPLE ASSEMBLY,ENGAGE I SPEAR IN TUBING BELOW HANGER 10:30 - 12:00 1.50 PULL P DECOMP i BACK OUT LOCK DOWN SCREWS AND PULL HANGER TO FLOOR -WORK STRING WEIGHT UP IN 5 KLBS j I INCREMENTS FROM ORIGINAL TUBING PUW OF 170 KLBS TO LIMIT OF 200 KLBS PER OCN #2.HANGER FREE AT 100 KLBS,TUBING NOT FREE AT 200 KLBS LIMIT.WORK STRING AT 120 KLBS. 1-CONTACT ODE,ETL AND ACTING WSUP (ONSITE)AND RECEIVE APPROVAL TO i INCREASE PICKUP LIMIT IN 5 KLBS INCREMENTS TO 80%OF TUBING YIELD(230 KLBS) -TUBING COMES FREE AT 223 KLBS -PICKUP/SLACKOFF WEIGHTS WITH TUBING 115 KLBS/70 KLBS ALL WEIGHTS REPORTED ARE STRING WEIGHT(NOT INCLUDING BLOCKS) 112:00 - 12:30 0.50 PULL P DECOMP SPACE OUT HANGER AT RIG FLOOR AND I TERMINATE CONTROL LINE 40'BELOW ' I 'HANGER I 12:30 - 13:30 1.00 i DHB i P DECOMP CLOSE ANNULAR PREVENTERAND I CIRCULATE BOTTOMS UP THROUGH CHOKE AND MUD GAS SEPERATOR WITH HANGER AT FLOOR -7 BPM,1300 PSI(1500 PSI LIMIT ON SLB SPEAR PACKOFF) -FLOW CHECK WELL FOR 10 MIN,STATIC 13:30 - 15:00 1-50 PULL P DECOMP LAY DOWN SPEAR AND HANGER,TERMINATE CONTROL LINE 40'BELOW PREVIOUS ' i LOCATION IN PREPERATION TO HANG OFF 16:30 1.50 BOPSUR 4 15:00 ON TEST PLUG AND TEST BOPE P DECOMP MAKE UP TEST PLUG/TUBING HANG-OFF ASSEMBLY,SET IN TUBING SPOOL PROFILE. MAKE UP 5-1/2"TEST JOINT AND FILL LINES I FOR BOPE TEST. Printed 10/2/2017 1:50:09PM *AIL depths reported in Workover Depths* a - North America-ALASKA-BP • Page 8 of 21 7 Operation Summary Report r` Common Well Name:P1-04 AFE No Event Type:WORKOVER(WO) Start Date:9/9/2017 End Date: X4-014DC-E:(4,686,000 00) Project Point McIntyre Site:Pt Mac 1 Rig Name/No.:PARKER 272 Spud Date/Time.5/11/1993 12:00:00AM Rig Release:9/23/2017 Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001752 Active datum:7:04 5/11/1993 00:00 l50.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase , Description of Operations i (hr) (usft) i. ;16:30 - 20:00 I 3.50 BOPSUR P DECOMP PRESSURE TEST BOPE 250/3500 PSI FOR 5/5 CHARTED MIN EACH PER AOGCC AND BP 'REQUIREMENTS -TEST UPPER RAMS(3-1/2"X 5-1/2"VBR) 1 I WITH 4"AND 5-1/2"TEST JOINT I '-TEST LOWER PIPE RAMS(3-1/2"X 5-1/2" VBR)WITH 4"AND 5-1/2"TEST JOINT ,-TEST ANNULAR PREVENTER WITH 4"AND 15-1/2"TEST JOINT I TEST BLIND/SHEARS , 1-TEST RAM-LOCKS ON UPPER RAMS, I BLIND/SHEAR RAMS,AND LOWER PIPE RAMS 1-ALL CHOKE MANIFOLD VALVES, SUPER-CHOKE,MANUAL CHOKE AND APPLICABLE VALVES FROM BACK SIDE I I TESTED OFF CRITICAL PATH WHILE WAITING i I � ON PLAN FORWARD 1 I-ALL TESTS PASS TEST KILL AND CHOKE HCRS AND MANUAL VALVES -TEST NC50 AND HT-38 FOSV -PERFORM ACCUMULATOR DRAW-DOWN ' :TEST I i-=TEST ALARMS,PVT AND FLOW SHOW REVIEW PRESSURE CROSSCHECK BEFORE BEGINNING TESTS I � I I-SEE ATTACHED PRESSURE TEST CHARTS I -AOGCC REP GUY COOK WAIVED WITNESS 1 2:50 PM ON 9/13/17 20.00 - 21.00 1.00 BOPSUR ! P DECOMP I RIG DOWN FROM BOPE TEST AND PREPARE TO PULL 4-1/2",12.6#,13CR,NSCT TUBING I-PULL AND LAY DOWN TEST PLUG j-SECURE CONTROL LINE TO SPOOLER 21:00 - 00:00 3.00 PULL P ( DECOMP PULL AND LAY DOWN 4-1/2",12.6#,13CR, i I NSCT TUBING FROM CUT DEPTH AT 10406' MD TO 8080'MD(SSSV AT SURFACE) I I-FULL LIST OF TUBING AND JEWELRY RECOVERED FROM WELL DETAILED IN NEXT TIME ENTRY I -MUD WEIGHT 9.8 PPG IN/OUT LOSS RATE FOR 24 HOUR PERIOD=2 BPH 9/16/2017 00:00 - 01.00 1.00 PULL P � DECOMP CIRCULATE SOAP PILL SURFACE TO SURFACE AT 12 BPM TO CLEAN UP SCALE/ PARAFFIN ON SURFACE OF TUBING 01 00 - 09:00 8.00 PULL P DECOMP I PULL AND LAY DOWN 4-1/2",12.6#,13CR, NSCT TUBING FROM 8080'MD TO SURFACE 1 1-RECOVERED(62)STAINLESS STEEL BANDS, , 1(260)FULL JOINTS,(1)SSSV,(3)GLMS,AND (1)CUT JOINT,ALL TUBING AND JEWELRY !RECOVERED AS EXPECTED :-TUBING CUT:NO FLARE,INCOMPLETE CUT 1 1 WITH WITH TABS REMAINING ON APPROX. 130%OF CUT FACE I I :-MUD WEIGHT 9.8 PPG IN/OUT I LOSS RATE=2 BPH I 09:00 - 10:30 1.50 PULL P DECOMP 1 RIG DOWN 4-1/2"TUBING HANDLING j EQUIPMENT,CLEAN AND CLEAR RIG FLOOR, L 1 AND INSTALL 9-1/16"WEAR RING Printed 10/2/2017 1.50:09PM *AII depths reported in Workover Depths* 110 North America-ALASKA BP Page 9 Of 21 Operation Summa Report Common Well Name:P1-04 AFE No Event Type:WORKOVER(WO) Start Date:9/9/2017 End Date: X4-014DC-E:(4,686,000.00) Project:Point McIntyre Site:Pt Mac 1 Rig Name/No.:PARKER 272 Spud Date/Time:5/11/1993 12:00:OOAM Rig Release:9/23/2017 Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001752 Active datum:7:04 5/11/1993 00:00 @50.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 10:30 - 11:30 1.00 CLEAN P DECOMP PICKUP AND MAKE UP 4-1/2"DRESS-OFF ASSEMBLY FROM SURFACE TO 333'MD -WASH PIPE WITH DRESS-OFF PADS AND 6-BLADE CONCAVE MILL ON INSIDE TO DRESS 4-1/2"TUBING STUB -MONITOR WELL PRIOR TO RUNNING IN HOLE,SLIGHT LOSSES MUD WEIGHT 9.8 PPG IN/OUT -MONITOR DISPLACEMENT VIA TRIP TANK 11:30 - 17:30 6.00 CLEAN P DECOMP TRIP IN HOLE WITH 4-1/2"DRESS-OFF ASSEMBLY ON 4"DRILL PIPE FROM BHA AT 333'MD TO 4-1/2"TUBING STUB AT 10410'MD ON ELEVATORS -ON SINGLES FROM BHA AT 333'MD TO 2600' MD -ON STANDS FROM THE DERRICK FROM 2600'MD TO TUBING STUB AT 10410'MD -FILL PIPE EVERY 2000'MD -TRIPPING SPEED=200 FPM -NO ISSUES TRIPPING IN HOLE -WASH DOWN LAST STAND AT 2 BPM,TAG TUBING STUB AT 10410'MD I i j 1 SLOW PUMP RATES @ 10370'MD WITH 9.8 PPG BRINE: 1 MP#1:30 SPM=800 PSI,40 SPM=1310 PSI MP#2 30 SPM=800 PSI,40 SPM=1320 PSI 17:30 - 20:00 ' 2.50 CLEAN P i DECOMP DRESS OFF TUBING STUB -3 BPM,1000 PSI,20 RPM,5-6 KFT-LBS :TORQUE '-PICK UP WITHOUT PUMPS OR ROTATION AND OBSERVE 15 KLBS OVERPULL -DRESS STUMP WITH THREE MORE WASHOVER PASSES.PICK UP WITHOUT 1 PUMPS OR ROTATION AND OBSERVE 7 KLBS OVERPULL.ATTEMPT TO SWALLOW STUMP WITH NO PUMPS OR ROTATION,NO I I SUCCESS. I-DRESS STUMP WITH TWO MORE PASSES. PICK UP AND SWALLOW STUMP TWO TIMES, NO OVERPULL OR SET DOWN -SUSPECTED CAUSE OF OVERPULLS IS FILL AROUND TUBING STUB(FORMATION/SAND) 20:00 - 22:30 2.50 CLEAN j P DECOMP CIRCULATE HOLE CLEAN WITH TWO HI-VIS SWEEPS SURFACE TO SURFACE -8-11 BPM,2100-3800 PSI,20 RPM,4-5 KFT-LBS TORQUE -OBSERVE BLACK SAND OVER SHAKERS WHEN SWEEPS COME BACK SLOW PUMP RATES @ 10410'MD WITH 9.8 PPG BRINE: MP#1:30 SPM=250 PSI,40 SPM=440 PSI MP#2 30 SPM=250 PSI,40 SPM=440 PSI Printed 10/2/2017 1.50:09PM 'All depths reported in Workover Depths* • North America-ALASKA-BP S Page 10 of 21 Operation Summary Report Common Well Name:P1-04 AFE No Event Type:WORKOVER(WO) I Start Date:9/9/2017 End Date: X4-014DC-E:(4,686,000.00) Project:Point McIntyre Site:Pt Mac 1 Rig Name/No.:PARKER 272 Spud Date/Time:5/11/1993 12:00:00AM Rig Release:9/23/2017 Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001752 Active datum:7:04 5/11/1993 00:00 @50.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 22:30 - 00.00 1.50 CLEAN P DECOMP TRIP OUT OF HOLE WITH 4-1/2"DRESS-OFF ASSEMBLY FROM 4-1/2"TUBING STUB AT 10410'MD TO 8266'MD ON ELEVATORS • 1-MONITOR WELL FOR 10 MIN PRIOR TO • PULLING OFF BOTTOM,SLIGHT LOSSES DROP 2-3/8"DRILL PIPE DRIFT 1-RACK BACK STANDS IN DERRICK(BUILD CRADLE"TO RACK BACK 2-7/8"HT-PAC FOR CLEANOUT RUNS) -TRIPPING SPEED=200 FPM -NO ISSUES TRIPPING OUT OF HOLE 9/17/2017 00:00 03:00 3.00 CLEAN P DECOMP TRIP OUT OF HOLE WITH 4-1/2"DRESS-OFF ASSEMBLY FROM 8266'MD TO BHAAT 333' MD ON ELEVATORS -RACK BACK STANDS IN DERRICK(BUILD •"CRADLE"TO RACK BACK 2-7/8"HT-PAC FOR I CLEANOUT RUNS) -TRIPPING SPEED=200 FPM -NO ISSUES TRIPPING OUT OF HOLE LOSE HI-LINE POWER,START UP TWO GENERATORS.WILL FOLLOW UP WITH CPS IN THE MORNING. PERFORM KICK WHILE TRIPPING DRILL(D1) DURING BLACKOUT.CONDUCT AAR 03:00 - 04:00 1.00 CLEAN P DECOMP LAY DOWN 4-1/2"DRESS-OFF ASSEMBLY AND MAKE UP 7-5/8"RTTS -MONITOR WELL FOR 10 MIN PRIOR TO • PULLING NON-SHEARABLES THROUGH STACK,SLIGHT LOSSES 04:00 - 06:30 2.50 CLEAN P DECOMP TRIP IN HOLE WITH 7-5/8"RTTS ON 4"DRILL PIPE FROM SURFACE TO 4074'MD ON ELEVATORS 1-MONITOR WELL FOR 10 MIN PRIOR TO TRIPPING IN HOLE,SLIGHT LOSSES,1-2 BPH -FILL PIPE EVERY 2000'MD -TRIPPING SPEED=90 FPM I-NO ISSUES TRIPPING IN HOLE 06:30 - 08:30 2.00 CASREP P INTERV SET RTTS ON DEPTH AT 4074'MD CENTER OF ELEMENT -MAKE UP TOP DRIVE AND CIRCULATE ' THROUGH THE RTTS SET RTTS PER HALLIBURTON DIRECTION -PRESSURE TEST 7-5/8"CASING FROM 4074' MD TO SURFACE -MIT TO 3500 PSI FOR 30 MIN,PASS/FAIL CRITERIA 3B(100218)PRESSURE TESING- PASSING TEST -SEND TEST RESULTS TO WEEKEND WSUP FOR APPROVAL-APPROVAL TO PROCEED 08:30 - 10:00 1.50 CASREP P INTERV PULL OUT OF THE HOLE WITH RTTS ON 4"DP I-PULL ON ELEVATORS FROM 4078'MD TO SURFACE -BREAK AND LD RTTS -MONITOR DISPLACEMENT ON TRIP TANK.- SLIGHT LOSSES TO WELL 1-2 BPH -POOH AT 90 FPM Printed 10/2/2017 1:50:09PM *All depths reported in Workover Depths* • North America-ALASKA-BP 1111 Page 11 of 21 Operation Summary Report Common Well Name:P1-04 AFE No Event Type:WORKOVER(WO) Start Date:9/9/2017 I End Date: X4-014DC-E:(4,686,000.00) Point McIntyre — —' Project: ty Site Pt Mac 1 I Rig Name/No.:PARKER 272 I Spud Date/Time:5/11/1993 12:00:00AM Rig Release:9/23/2017 Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001752 Active datum:7:04 5/11/1993 00:00©50.40usft(above Mean Sea Level) Date 1 From-To Hrs Task Code NPT I Total Depth Phase Description of Operations (hr) (usft) 10:00 - 12:00 ' 2.00 CASING P TIEB1 ,RIG UP TO RUN 5.5"17#,13CR VAM TOP HC I SCAB LINER. I 1 -RIG UP TONGS AND TORQUE TURN EQUIPMENT j-VERIFY LINER,SHOE TRACK AND LINER HANGER/PACKER IN PIPE SHED I -VERIFY LIFTING TOOLS SIZE AND LIFTING CAPACITY. 12:00 - 23:00 11.00 CASING P TIEB1 I RIG UP TO RUN 5.5"17#,13CR VAM TOP HC ' !SCAB LINER TO 6376'MD -PU,MAKE UP&BAKER LOCK SHOE TRACK. -CHECK FLOATS,GOOD -USE JET LUBE SEAL GUARD PIPE DOPE (FF=1.0)ON ALL VAMTOP CONNECTIONS -TORQUE TURN ALL 5 112"12.6#VAM TOP HC CONNECTIONS TO 6580 FT-LBS -RUN LINER PER APPROVED TALLY,INSTALL I I CENTRALIZERS PER WELL PROGRAM I -FILL LINER EVERY ON THE FLY,TOP OFF EVERY 10 JTS RUN A TOTAL OF 152 JOINTS / 6376'OF LINER I I I-VERIFY PIPE COUNT IN PIPE SHED 123:00 23:30 0.50 CASING I P TIEB1 t PICKUP AND MAKE UP WEATHERFORD 7-5/8" X 5-1/2"LINER HANGER/PACKER ASSEMBLY { I -CHANGE ELEVATORS -VERIFY SHEAR SCREWS ON LINER HANGER !AND ON LINER TOP PACKER WITH I I WEATHERFORD REPRESENTATIVE I I-POUR HIGH-VIS MIX INTO PBR AND RE-INSTALL BONNET -PACK SBR WITH PAL MIX D1-KICK WHILE TRIPPING WITH NON I I SHEARABLE LINER HANGER/PACKER , !ASSEMBLY ACROSS THE STACK '-CONDUCTAAR. 23:30 - 00:00 0.50 CASING P TIEB1 ,RIG SERVICE — I I 1-GREASE WASH PIPE Printed 10/2/2017 1:50.00PM "All depths reported in Workover Depths* North America-ALASKA-BP S Page 12 of 21 Operation Summary Report Common Well Name:P1-04 AFE No Event Type:WORKOVER(WO) Start Date:9/9/2017 End Date: X4-014DC-E:(4,686,000.00) Project:Point McIntyre Site:Pt Mac 1 Rig Name/No.:PARKER 272I Spud Date/Time:5/11/1993 12:00:00AM Rig Release:9/23/2017 Rig Contractor PARKER DRILLING CO. BPUOI:USA00001752 Active datum:7:04 5/11/1993 00:00©50.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 9/18/2017 00:00 - 03:00 3.00 CASING P 10,400.00 TIEB1 RUN IN THE HOLE WITH 5 1/2"VAM TOP SCAB LINER ON 36 JNTS 4"HWDP AND 4'DRILL PIPE STANDS OUT OF THE DERRICK -WITH ONE JOINT OF 4"HWDP PICKED UP BREAK CIRCULATION-4 BPM,175 PSI -FROM 6376'MD TO 10410'MD -RUNNING SPEED 60-90 FPM PER WFD REP -FILL PIPE EVERY 10 STANDS -PU 192K,SO 172K -MW IN/OUT=9.8 PPG BRINE -MAKE UP CEMENT HEAD AND SINGLE -RIH WITH OVERSHOT START TAKING WEIGHT-4 IN ON SINGLE -ATTMEPT TO SLIDE OVERSHOT OVER 4-1/2" STUB PU SEVERAL TIMES.SET DOWN MAX 6-8 K. -ROLL PUMPS AT 84 GPM,145 PSI. -SET DOWN 10K,OBSERVE FIRST SET OF SHEAR PINS.CONTINUE RUNNING IN,NO OBSERVATION OF SECOND SET OF SHEAR PINS. -SET DOWN 25 K TO NO GO MATCHING CALCULATED NO GO,PICK UP OVER STRING 'WEIGHT PLUS TWO FEET. -PLACING UNIQUE OVERSHOT AT 10417'MD ROUGHLY 10'OVER THE TOP OF THE 4-1/2" TUBING STUB -TOP OF 5-1/2"SCAB LINER AT 4008'MD -TOTAL LOSSES WHILE RUNNING LINER IN THE HOLE=15 BBLS 03:00 - 07:00 4.00 CASING P 10,400.00 TIEB1 CIRCULATE PRIOR TO CEMENTING 5-1/2" SCAB LINER. ESTABLISH PRESSURES AT CEMENTING RATES OF 5 AND 7 BPM -2BPM-244 PSI -3 BPM-265 -4 BPM-470 PSI -5 BPM-711 PSI -6 BPM-994 PSI -7 BPM-1316 PSI -9.8 PPG BRINE IN/OUT. SIM-OPS CEMENTERS ON LOCATION AT 04:00,SPOTTING TRUCKS AND START RIGGING UP. -LINE UP AND PRESSURE TEST CEMENT LINES. REVIEW Printed 10/2/2017 1:50:09PM *All depths reported in Workover Depths* �► : North AmericaALASKA BP S 13021 Summary Report . Common Wet Name.P1-04 AFE No Event Type:WORKOVER(WO) Start Date:9/9/2017 End Date: X4-014DC-E:(4,686,000 00) Project:Point McIntyre Site:Pt Mac 1 Rig Name/No.:PARKER 272 Spud Date/Time:5/11/1993 12.00:00AM Rig Release:9/23/2017 Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001752 Active datum:7:04 5/11/1993 00:00 @50.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) . (usft) 07:00 - 09:00 2.00 CEMT P 10 400.00 TIEB1 CEMENT 5-1/2"SCAB LINER AS FOLLOWS -FILL LINES WITH WATER AND PRESSURE TEST TO 4500 PSI FOR 5 MINUTES -PUMP 10 BBLS OF 12 PPG MUDPUSH II SPACER AT 5 BPM,700 PSI -PUMP 128 BBLS OF 15.3 PPG CLASS G TAIL AT 5 BPM(YIELD 1.17 CU.FT/SK),ICP 700 PSI, FCP 160 PSI -RELEASE DART FROM WEATHERFORD CEMENT HEAD. SCHLUMBERGER CEMENTERS KICK OUT DART WITH 5 BBLS 12 PPG MUDPUSH II SPACER AT 5 BPM, 160 PSI -PERFORM DISPLACEMENT WITH RIG PUMPS AND 9.8 PPG BRINE MUD PER SLB CEMENTICS -DISPLACE 20 BBLS AT 5 BPM,115 PSI(DID NOT CATCH PRESSURE) -SLOW DOWN FOR FIRST DART LATCH AND DISPLACE 17 BBLS AT 3 BPM,40 PSI(DID NOT CATCH PRESSURE) -DID NOT OBSERVE LATCH;INCREASE RATE BACK TO 7 BPM AFTER CALCULATED LATCH +5 BBLS -DISPLACE 35 BBLS AT 7 BPM,115 PSI(DID NOT CATCH PRESSURE) -SLOW DOWN TO 6 BPM(SUSPECTED LOSSES) -DISPLACE 25 BBLS AT 6 BPM,ICP 400 PSI, FCP 1020 PSI -CATCH PRESSURE,AND OBSERVE GAIN/ LOSS LEVEL OUT.SUSPECTED LOSSES CONFIRMED TO BE ONLY DUE TO FILLING PIPE(CEMENT FALLING AWAY). -INCREASE RATE BACK TO 7 BPM AND DISPLACE 73 BBLS AT 7 BPM,ICP 1500 PSI, FCP 3000 PSI -REDUCE RATE TO 2 BPM PRIOR TO PLUG BUMP:FINAL CIRCULATING PRESSURE 1590 PSI -BUMP PLUG(27 STROKES EARLY)AND INCREASE PRESSURE TO 2150 PSI,CHECK FLOATS-GOOD -TOTAL DISPLACEMENT VOLUME 183.1 BBLS (MEASURED BY STROKES @ 97%PUMP EFFICIENCY) -NO RECIPROCATION THROUGHOUT JOB -TOTAL LOSSES FROM CEMENT EXIT SHOE TO CEMENT IN PLACE:5 BBLS -CEMENT IN PLACE AT 09:01 AM(500 PSI COMPRESSIVE STRENGTH AT 19:55 ON 9/18/17) -TOTAL LIFT PRESSURE=2155 PSI -ESTIMATED 12 BBLS CEMENT CIRCULATED OFF TOP OF LINER -FIELD PICK TOP OF CEMENT=4008'MD (BASED ON VOLUME PUMPED,LOSSES,LIFT PRESSURE,AND CEMENT CIRCULATED OFF TOP OF LINER) -FLUID LEVEL DROPPING SLIGHTLY IN STACK AFTER CEMENT IN PLACE -SEE ATTACHED CEMENTING DOCUMENTS Printed 10/2/2017 1.50:09PM *All depths reported in Workover Depths* 410 North America-ALASKA-BP S Page 14 of 21 Operation Summary Report Common Well Name:P1-04 AFE No Event Type:WORKOVER(WO) Start Date:9/9/2017 End Date: X4-014DC-E:(4,686,000.00) Project:Point McIntyre I Site:Pt Mac 1 Rig Name/No.:PARKER 272 I Spud Date/Time:5/11/1993 12:00:00AM I Rig Release:9/23/2017 Rig Contractor:PARKER DRILLING CO. I BPUOI:USA00001752 Active datum:7:04 5/11/1993 00:00©50.40usft(above Mean Sea Level) Date I From-To Hrs Task I Code I NPT Total Depth I Phase 1 Description of Operations - — fi (hr) — (usft) I 09:00 - 09:30 , 0.50 CEMT I P 10,400.00 TIEB1 I SET WEATHERFORD 5-1/2"X 7-5/8"LINER I HANGER,RELEASE RUNNING TOOLAND SET ;LINER TOP PACKER • I -PRESSURE UP TO 3500 PSI TO SET HANGER I-SET 60 KLBS DOWN TO CONFIRM HANGER jSET -RELEASE LINER RUNNING TOOL WITH 10 I TURNS TO THE RIGHT -PICK UP TO EXPOSE DOG SUB I-SLACK OFF AND ESTABLISH ROTATION AT 10 RPM,2 KFT-LBS TORQUE;CONTINUE SLACKING OFF TO SET LINER TOP PACKER. OBSERVE SHEAR AT 40 KLBS DOWN. 09:30 - 10:00 0.50 CEMT P 10,400.00 TIEB1 I PICK UP TO EXPOSE INTERNAL SEALS AND CIRCULATE EXCESS CEMENT OFF TOP OF • LINER I-PRESSURE UP TO 1500 PSI(PREVENT CEMENT FALLING INTO LINER TOP WHEN SEALS ARE EXPOSED) WITH SEALS ABOVE TOP OF LINER, INCREASE PUMP RATE TO 10 BPM,1600 PSI, WITH 9.8 PPG BRINE -ESTIMATED 12 BBLS CEMENT CIRCULATED OFF LINER TOP I-ZERO LOSSES 10:00 - 11:00 1.00 CEMT P 10,400.00 TIEB1 ,RIG DOWN CEMENT EQUIPMENT -PREVENTATIVE MEASURES FOR CEMENT IN THE STACK: ' -FILL STACK WITH CONTAM PILL AND FUNCTION RAMS. 11:00 - 14:00 3.00 CEMT P TIEB1 1 POOH WITH LINER RUNNING TOOL FROM -4000'TO 1130'STANDING BACK 4"DP I I-MONITOR WELL ON TRIP TANK-CORRECT j HOLE FILL OBSERVED. 1-MONITOR WELL PRIOR TO PULLING HWDP • .THROUGH THE STACK.-STATIC I-PULL AND LAY DOWN 36 JNTS 4"HWDP TO THE PIPE SHED FROM 1130'TO SURFACE -LAYDOWN BUMPER SUB& RUNNING TOOL. 1*SIM OPS-PRESSURE TEST CHOKE _ I MANIFOLD OFFLINE. 14:00 - 15:00 1.00 CEMT P I TIEB1 FLUSH STACK POST CEMENTING :OPERATIONS -PULL WEAR RING - MAKE UP STACK RINSING SUB,RINSE I BOPE STACK AND WELL HEAD WITH CEMENT I CONTAM PILL. -SUCK OUT STACK 15:00 - 16:30 1.50 BOPSUR P TIEB1 RUN TEST PLUG,RUN IN LOCK DOWN SCREWS. -SHUT THE BLIND SHEAR RAMS.PRESSURE TEST PLUG AGAINST THE BLINDS 250 PSI LOW,3500 PSI HIGH-5 MIN EACH- , I I GOOD TEST. Printed 10/2/2017 1:50:09PM *AII depths reported in Workover Depths* 4111 Nath Arnica-ALASKA-BP z Aloe 1$a 21 Common Well Name:P1-04 AFE No Event Type:WORKOVER(WO) Start Date:9/9/2017 End Date: X4-014DC-E:(4,686,000.00) Project:Point McIntyre Site:Pt Mac 1 Rig Name/No.:PARKER 272 Spud Date/Time:5/11/1993 12:00:OOAM I Rig Release:9/23/2017 Rig Contractor PARKER DRILLING CO. BPUOI.USA00001752 Active datum:7:04 5/11/1993 00:00 @50.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 16:30 - 19:30 3.00 BOPSUR P TIEB1 CHANGE RAMS IN BOP -CHANGE OUT LOWER RAMS PER THE WELL PROGRAM. -INSTALL 2-7/8"X 5"VARIABLE BORE RAMS I IN UPPER AND LOWER RAM CAVITIES I-BARRIERS FOR BREAKING CONTAINMENT- KWF,TEST PLUG WITH LOCK DOWN SCREWS IN. 19:30 - 20:00 0.50 BOPSUR P TIEB1 TRIG UP FOR BOP PRESSURE TEST I-MAKE UP TEST JOINT,PURGE LINES 20:00 - 22:30I 2.50 BOPSUR P TIEB1 I PRESSURE TEST BOPE 250/3500 PSI FOR 5/5 CHARTED MIN EACH PER AOGCC AND BP REQUIREMENTS Ii I-TEST UPPER RAMS(2-7/8"X 5"VBR)WITH it 12-7/8"AND 4-1/2"TEST JOINTS -TEST LOWER RAMS(2-7/8"X 5"VBR)WITH 2-7/8"AND 4-1/2"TEST JOINTS I-TEST ANNULAR PREVENTER WITH 2-7/8" TEST JOINT TEST BLIND/SHEARS I-CHOKE MANIFOLD TESTED OFFLINE I-ALL TESTS PASS -TEST KILL AND CHOKE HCRS AND MANUAL VALVES I 1-TEST 2-7/8 AND HT-38 FOSV 1-PERFORM ACCUMULATOR DRAW-DOWN TEST -REVIEW PRESSURE CROSSCHECK BEFORE BEGINNING TESTS -SEE ATTACHED PRESSURE TEST CHARTS -AOGCC REP LOU LAUBENSTEIN WAIVED I WITNESS ON 9/18/17 22.30 - 23:00 0.50 BOPSUR P TIEB1 I RIG DOWN BOPE TESTING EQUIPMENT -BOLDS AND PULL TEST PLUG. -INSTALL WEAR RING BOWL PROTECTOR- 9-1/16"ID 23:00 - 23:30 0.50 BOPSUR ; P TIEB1 RIG SERVICE. -SERVICE RIG FLOOR EQUIPMENT 23:30 - 00:00 0.50 CASING P TIEB1 PRESSURE TEST 5-1/2"VAM TOP HC SCAB LINER AND 7-5/8"X 5-1/2"LINER TOP PACKER -RIG UP TEST EQUIPMENT,PURGE LINES OF I AIR. -MIT TO 3500 PSI FOR 30 MIN,PASS/FAIL CRITERIA 3B(100218)PRESSURE TEASING- PASSING TEST -SEND TEST RESULTS TO WSUP FOR APPROVAL-APPROVAL TO PROCEED GRANTED -SEE ATTACHED PRESSURE TEST CHART AND CRITERIA CALCULATOR. -REVIEW PRESSURE CROSSCHECK BEFORE I j BEGINNING TESTS -PRESSURE TEST WITH 9.8 PPG BRINE Printed 10/2/2017 1:50.09PM *AII depths reported in Workover Depths* • North America-ALASKA-BP 410 Page 16 of 21 Operation Summary Report Common Well Name:P1-04 AFE No Event Type:WORKOVER(WO) Start Date:9/9/2017 End Date: X4-014DC-E:(4,686,000.00) Project:Point McIntyre I Site:Pt Mac 1 Rig Name/No.:PARKER 272 I Spud Date/Time:5/11/1993 12:00:00AM Rig Release:9/23/2017 Rig Contractor:PARKER DRILLING CO. I BPUOI:USA00001752 Active datum:7:04 5/11/1993 00:00©50.40usft(above Mean Sea Level) Date From-To Hrs 1 Task ! Code NPT Total Depth Phase Description of Operations _ (hr) __ (usft) • _ 9/19/2017 00:00 01:00 1.00 CASING P TIEB1 CONT: PRESSURE TEST 5-1/2"VAM TOP HC I i SCAB LINER AND 7-5/8"X 5-1/2"LINER TOP PACKER , -RIG UP TEST EQUIPMENT,PURGE LINES OF IAIR. '-MIT TO3500PSI FOR 30MIN,PASS/FAIL � I CRITERIA 3B(100218)PRESSURE TESTING- PASSING TEST -SEND TEST RESULTS TO WSUP FOR I I APPROVAL-APPROVAL TO PROCEED I GRANTED i-SEE ATTACHED PRESSURE TEST CHART AND CRITERIA CALCULATOR. 01:00 - 02:00 1.00 CLEAN P TIEB1 PICK UP AND MAKE UP 2-7/8"HANDLING I !EQUIPMENT -RIG UP DDI CASING EQUIPMENT 02:00 - 03:30 1.50 CLEAN P 195.00 TIEB1 I MAKEUP 5-112"CEMENT DRILL OUT BHA IASSEMBLY -MAKE UP BHA PER SLB FISHERMAN FROM j SURFACE TO-195'MD I-4-3/4"BIT,FLOAT SUB,STING MILL,6-3-1/4" I DRILL COLLARS,XO TO 2-7/8"HT PAC I-TOTAL BHA LENGTH:195' 03:30 - 13:30 10.00 CLEAN P i 6,975.00 TIEB1 RIH WITH 5-1/2"DRILL OUT ASSEMBLY ON 12-7/8"HT PAC PIPE SINGLES FROM THE PIPE 'SHED '-RIH FROM 195'TO 6975'MD -MONITOR TRIP ON TRIP TANK-CORRECT I DISPLACEMENT OBSERVED -20 RPM,2K TQ,PU-82K,SO-104K,ROT � WT-91K 13:30 - 16:30 3.00 CLEAN P 10,140.00 TIEB1 RIH WITH 5-1/2"DRILL OUT ASSEMBLY ON 4" DP FROM 6975'MD TO-10,140'MD -RIH ON ELEVATORS WITH 4"DP STANDS FROM DERRICK. j 1 1-FILL PIPE EVERY 1000' 1-PU-137K,SO-105K,ROT-120K -ENCOUNTER CEMENT STRINGER AT 10140' MD -MW=9.8 PPG BRINE,MONITOR WELL ON TRIP TANK-CORRECT DISPLACEMENT ,OBSERVED ---1-_ I-TAKE SPR'S AT 10000'MD 16:30 - 21:30 5.00 CLEAN P 10,309.00 TIEB1 I WASH AND REAM FROM 10,140'MD TO 10,309' !MD I-WASH AND REAM DOWN THROUGH CEMENT STRINGERS I-4 BPM,2800 PSI,20 RPM,3-4K TQ -NO SOLID CEMENT,ONLY CONTAMINATED CEMENT(MUD PUSH AND CEMENT MIX) i I-TAG LANDING COLLAR AT 10309'MD,ON DEPTH TO TALLY I I-SIGNIFICANT VOLUME OF CONTAMINATED !CEMENTAT BOTTOMS UP -DISPLACE WELL WITH NEW 9.8 PPG BRINE 1 WITH 0.5%BARA LUBE W540 I CONCENTRATION 21:30 22:00 0.50 CLEAN P 10,309.00 TIEB1 I CIRCULATE LINER VOLUME TO CLEAR 5-1/2" !LINER OF CEMENT AND MUD PUSH -160 GPM,2780 PSI. -40 RPM,4.5 K TQ,RECIPROCATE PIPE FULL STAND Printed 10/2/2017 1:50:09PM *All depths reported in Workover Depths* 110 North America-ALASKA-BP • Page 17 of 21 Operation Summary Report Common Well Name:P1-04 AFE No Event Type:WORKOVER(WO) I Start Date:9/9/2017 End Date: X4-014DC-E:(4,686,000.00) Project:Point McIntyre T Site:Pt Mac 1 1 Rig Name/No.:PARKER 272 Spud Date/Time:5/11/1993 12:00:00AM Rig Release:9/23/2017 Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001752 Active datum:7:04 5/11/1993 00:00 @50.40usft(above Mean Sea Level) Date From-To Hrs 1 Task Code NPT I Total Depth Phase ! Description of Operations 1 (hr) — I (usft) 22:00 - 00:00 2.00 CLEAN P 10,310.00 TIEB1 i DRILL CEMENT PLUG AND SHOE TRACK FROM 10,309'TO 10,310'MD 1 ' j 1-4 BPM,2800 OFF BOTTOM,2870 PSI ON BOTTOM,1-3 K WOB,30-60 RPM WITH 4- ji I4.5KTQ -PU-145,SO-110K,ROT-130K,20 RPM,4.5K FREE TQ 1-VARY PARAMETERS WHILE DRILLING PLUG 1-MW=9.8PPG BRINE 1-NO LOSSES WHILE DRILLING PLUG. 9/20/2017 00:00 - 07:00 7.00 CLEAN P 10,311.00 TIEB1 DRILLCEMENT PLUG AND SHOE TRACK FROM 10,310'TO 10,311'MD 1 1-1-4 BPM,800-2870 PSI,3-8 K WOB,30-60 RPM WITH 4 4.5 K TQ. -PU=145,SO=110K,ROT=130K,20 RPM IWITH4.5KTO I-VARYING PARAMETERS TO ATTEMPT TO MORE EFFECTIVELY DRILL PLUG I -ON BOTTOM TQ VALUE SAME AS OFF BOTTOM WHILE DRILLING WITH 3 BPM,1600 I PSI,30-60 RPM,4.5 TO 4.7 K TQ -ATTEMPT TO DRILL PLUG WITH 1 BPM W/ 1320 PSI WHILE INCREASING WOB FROM 1K TO 6K.OBSERVED TORQUE INCREASE TO 5K. !-INCREASE PUMP TO 3-4 BPM,2800-3500 { PSI -OBSERVE PIECES OF BLACK RUBBER AT SHAKERS AT BOTTOMS UP -CONTINUE DRILLING PLUG&LANDING 1 COLLAR AT 1-4.5 BPM,300- 3600 PSI,30- 50 RPM,1-6 K WOB 4 MW=9.8 PPG BRINE IN/OUT 07:00 - 14:00 7.00 CLEAN P 10,394.00 TIEB1 I CONTROL DRILL CEMENT SHOE TRACKAND I FLOAT SHOE FROM 10,311'TO 10,394'MD I-128 GPM:1520 PSI ON,1500 PSI OFF i-168 GPM:2870 PSI ON,2800 PSI OFF,20-60 RPM,4K TQ OFF,5K TQ ON,6-8 KLBS WOB ' I-PU=155K,SO=112K,ROT=128K II 1-PUMP 40 BBL EP MUD LUBE -TAGGED UP ON FLOAT COLLAR AT 10,349' ON DEPTH TO TALLY 14:00 - 15:00 1.00 CLEAN P 10,394.00 TIEB1 I CIRCULATE 40 BBL HIGH VIS SWEEP -190 GPM,2875 PSI,50 RPM,5K TO -MW=9.8 PPG BRINE IN/OUT.NO LOSSES. 15:00 - 17:30 2.50 CLEAN P 10,394.00 TIEB1 ,PULL OUT OF THE HOLE ON ELEVATORS WITH 5-1/2"DRILL OUT ASSEMBLY FROM 110,394'MD TO 6970'MD iRACK BACK STANDS OF 4"DP IN DERRICK j -MONITOR WELL 10 MIN PRIOR TO PULLING I I OFF BOTTOM:WELL STATIC !-MONITOR WELL ON TRIP TANK:CORRECT '_ 'HOLE FILL OBSERVED i 17:30 - 21:00 3.50 CLEAN P 10,394.00 TIEB1 I PULL OUT OF THE HOLE ON ELEVATORS W/ 5-1/2"DRILL OUT ASSEMBLY FROM 6970'MD 1195' I-RACK BACK 2-7/8"HT PAC PIPE IN THE 1 DERRICK -MONITOR WELL PRIOR TO PULLING BHA THROUGH STACK WELL STATIC Printed 10/2/2017 1:50:09PM `AII depths reported in Workover Depths` 410 7::,..,,,,,,,,,m,,,,,,,,,,..,,,,.,„,_,.„, North America-ALASKA-BP • Page 18 of 21 4f.811, " Operation Summary Report Common Well Name.P1-04 AFE No Event Type:WORKOVER(WO) Start Date:9/9/2017 I End Date: X4-014DC-E:(4,686,000.00) Project:Point McIntyre Site:Pt Mac 1 Rig Name/No.:PARKER 272 Spud Date/Time:5/11/1993 12:00:00AM Rig Release:9/23/2017 Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001752 Active datum:7:04 5/11/1993 00:00 @50 40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations hr usft 21:00 - 22:00 T. 1.00 CLEAN 1 P 10,394.00 TIEB1 1PULLAND LAY DOWN BHA -LAY DOWN 6-3-1/4"DRILL COLLARS,BREAK 1 1BIT I ,-INSPECT BIT FOR WEAR.FOUND LARGE PIECE OF ALUMINUM WEDGED IN THE I CONES PREVENTING ROTATION OF 2/3 1 CONES. 22:00 - 22:30 0.50 CLEAN P 10,394.00 TIEB1 CLEAN AND CLEAR RIG FLOOR I-PREPARE FOR MILLING BHA RUN 22:30 - 23:00 0.50 I CLEAN P 10,394.00. TIEB1 TRIG SERVICE __ SERVICE PIPE CAT RIG FLOOR EQUIPMENT. 23:00 - 00:00 1.00 CLEAN P I 10,394.00 TIE81 IMAKE UP AND RIH WITH 4-1/2"MILLING ,ASSEMBLY BHA FROM SURFACE TO 7.72'PER i SCHLUMBERGER REPRESENTATIVE -5 BLADE MILL,DOUBLE BOX SUB,STRING MILL ALL TOOLS GAUGED WITH 3.72'GAUGE RING.TOTAL BHA LENGTH=7.72' -RIH WITH 4-1/2"MILLING ASSEMBLY ON j 2-7/8"HT PAC STANDS FROM 7.72'TO 1894' MD !-MONITOR WELL ON TRIP TANK:CORRECT —1_ iDISPLACEMENT OBSERVED I 9/21/2017 00:00 - 04:30 4.50 CLEAN i P 10,394.00 TIEB1 1,RIH WITH 4-1/2"MILLING ASSEMBLY BHA i FROM 1894'TO 10394'MD -5 BLADE MILL,DOUBLE BOX SUB,STRING MILL ALL TOOLS GAUGED WITH 3.72'GAUGE RING.TOTAL BHA LENGTH=7.72' -RIH WITH 4-1/2"MILLING ASSEMBLY ON 2-7/8"HT PAC STANDS FROM 1894'-8792'MD j I I-CROSS OVER TO 4"DP AND CONTINUE i RUNNING IN THE HOLE FROM 6792'TO 10394' MD -MONITOR WELL ON TRIP TANK:CORRECT T I • !DISPLACEMENT OBSERVED ,04:30 07:00 t 2.50 CLEAN P 10,395.00 TIEB1 I WASH DOWN TO TOP OF COMPOSITE PLUG 1 AND DRILL UP PLUG FROM 10398'MD TO 110435'MD -TAG TOP OF CEMENT AT 10396'MD, I OBSERVE CONTAMINATED CEMENT I-OBSERVE TOP OF PLUG AT 10432'MD I-DRILL UP CEMENT AND COMPOSITE BRIDGE I PLUG -200 GPM,3600 PSI,50 RPM,4.5 KFT-LBS TORQUE,3 KLBS WOB I-PU=152 KLBS,SO=110 KLBS,ROT=125 ! KLBS 1-MUD WEIGHT=9.8 PPG IN/OUT Printed 10/2/2017 1.50:09PM •AII depths reported in Workover Depths* • North America-ALASKA-BP • Page 19 of 21 Operation Summary Report Common Wet Name:P1-04 AFE No Event Type:WORKOVER(WO) Start Date:9/9/2017 End Date: X4-014DC-E:(4,686,000.00) -I Project:Point McIntyre Site:Pt Mac 1 Rig Name/No.:PARKER 272 Spud Date/Time:5/11/1993 12:00:00AM Rig Release:9/23/2017 Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001752 Active datum.7:04 5/11/1993 00:00 @50.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT I Total Depth I Phase Description of Operations (hr) ! I (usft) 107:00 - 08:00 ' 1.00 CLEAN P 10,395.00 TIEB1 BULLHEAD 100 BBLS OF 9.8 BRINE I CONTAINING H2S SCAVENGER I-CLOSE ANNULAR PREVENTER TO I PERFORM BULLHEAD I -PUMP DOWN THE KILL LINE AND THE STANDPIPE AT 7 BPM,580 PSI SHUT DOWN PUMPS AND WATCH FOR --BUILDING PRESSURE,NO PRESSURE OBSERVED -OPEN ANNULAR PREVENTER AND : PERFORM 10 MINUTE FLOW CHECK INITIAL LOSS RATE WAS GREATER THAN 240 I BBLS/HR -FOLLOW WELL PROGRAM AND SOP TO FILL HOLE AT 100 BBLS/HR,ACCEPTABLE PER I j i DEVIATION 10155 TO MAINTAIN A STABLE FLUID COLUMN WITH CONTINUOUS HOLE I FILL WITH FLUID LEVEL BELOW THE ;SURFACE __ 08:00 - 11:00 3.00 CLEAN P 10,566.00 TIEB1 DRILL UP REMAINDER OF COMPOSITE PLUG !AND PUSH PLUG THROUGH THE TAILPIPE TO 110566'MD I-1.6 BPM(100 BPH LOSS RATE),211 PSI k 50 RPM,5 KFT-LBS TORQUE j-PUMP 80 BBL HIGH VIS SWEEP 1-FILL HOLE AT 100 BPH,WITH NO RETURNS 1:00 - 13:00 2.00 CLEAN P I 10,568.00 TIEB1 I PULL OUT OF THE HOLE WITH MILLING ASSEMBLY FROM 10566'MD TO 6700'MD ON IELEVATORS 1-RACK BACK STANDS OF 4"DRILL PIPE 1 PU=152 KLBS,SO=110 KLBS AT 10566'MD - MUD WEIGHT=9.8 PPG BRINE I 1 -FILL HOLE AT 100 BPH,WITH NO RETURNS 13:00 - 20:30 I 7.50 CLEAN P ' 10,566.00 TIEB1 PULL OUT OF THE HOLE WITH MILLING I I ASSEMBLY FROM 6700'MD TO SURFACE ON j ELEVATORS -LAY DOWN JOINTS OF 2-7/8"PAC PIPE 1-PU=95 KLBS,SO=93 KLBS AT 6700'MD I-FILL HOLE AT 100 BPH WITH NO RETURNS 20:30 - 21:30 1.00 CLEAN P I 10,568.00 TIEB1 I RIG UP CASING RUNNING EQUIPMENT -PULL WEAR RING -MONITOR WELL,FILL HOLE AT 100 BPH WITH NO RETURNS 21:30 - 22:00 0.50 CLEAN P 10,566.00 TIEB1 I SERVICE TOP DRIVE AND RIG FLOOR EQUIPMENT.GREASE BLOCKS AND CROWN. -FILL HOLE AT 100 BPH WITH NO RETURNS 22:00 - 00:00 2.00 ' CASING P 10,566.00 RUNCMP RUN 3-1/2",9.2#,13CR-85,VAMTOP COMPLETION TUBING TO 550'MD -USE JET LUBE SEAL GUARD PIPE DOPE -TORQUE CONNECTIONS TO 2900 FT-LBS I-RUN INHOLE AT90FT/MIN I-PU=40 KLBS,SO=40 KLBS AT 550'MD I I-MUD WEIGHT=9.8 PPG BRINE IN/OUT � II-FILL HOLE AT 100 BPH WITH NO RETURNS Printed 10/2/2017 1:50:09PM *AII depths reported in Workover Depths* ® North America-ALASKA-BP • Page 20 of 21 Operation Summary Report Common Well Name:P1-04 AFE No Event Type:WORKOVER(WO) Start Date:9/9/2017 End Date: X4-014DC-E:(4,686,000.00) Project Point McIntyre Site:Pt Mac 1 Rig Name/No.:PARKER 272 Spud Date/Time:5/11/1993 12:00:00AM Rig Release:9/23/2017 Rig Contractor:PARKER DRILLING CO. BPUOI:USA00001752 Active datum:7:04 5/11/1993 00:00 @50.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase Description of Operations (hr) (usft) 9/22/2017 00:00 - 14:00 14.00 CASING P 10,566.00 RUNCMP CONTINUE TO RUN 3-1/2"X 4-1/2",9.2#/12.6#, 13CR-85 VAMTOP COMPLETION TUBING FROM 550'MD-10300'MD 4-1/2"TUBING,X NIPPLE,XO TO 3-1/2" TUBING,(4) 3-1/2"X 1"GLM,X NIPPLE,TNT PACKER,X NIPPLE,XN NIPPLE,WLEG -3-1/2",9.2#TUBING FROM 10300'MD TO 3946'MD -4-1/2",12.6#TUBING FROM 3946'MD TO SURFACE -USE JET LUBE SEAL GUARD PIPE DOPE -TORQUE CONNECTIONS TO 2900 FT-LBS FOR 3-1/2"AND 4440 FT-LBS FOR 4-1/2" RUN IN HOLE AT90 FT/MIN -PU=40 KLBS,SO=40 KLBS AT 550'MD PU=126 KLBS,SO=101 KLBS AT 10300'MD -MUD WEIGHT=9.8 PPG BRINE IN/OUT -PUMPING CORROSION INHIBITED BRINE AT 1.5 BPM WHILE RUNNING IN THE HOLE -SHUT DOWN PUMPS AND LAND HANGER -RUN IN AND TORQUE LOCK DOWN SCREWS TO SPEC PER FMC -FILL HOLE AT 100 BPH WITH NO RETURNS SIMOPS:LAYING DOWN STANDS OF 4" DRILLPIPE OFFLINE 14:00 - 15:00 1.00 CASING P . 10,566.00 RUNCMP CIRCULATE REMAINING 150 BBLS OF CORROSION INHIBITED BRINE -2.5 BPM,550 PSI -CONTINUE TO OBSERVE 100 BBL/HR LOSSES SIMOPS:LAYING DOWN STANDS OF 4" DRILLPIPE OFFLINE 15:00 - 18:30 3.50 CASING P 10,566.00 RUNCMP DROP BALL AND ROD,SET PACKER, PRESSURE TEST TUBING AND IA TO 3500 PSI HIGH FOR 30 CHARTED MINUTES EACH(SEE ATTACHED PRESSURE TESTING DOCUMENTATION) -PRESSURE UP TO 2500 PSI ON THE TUBING AND 3500 PSI ON THE IA.OPEN BLEEDER TO IA AND SHEAR RHC-VALVE. -PUMP THROUGH SHEARED VALVE AT 2 BPM, 750 PSI TO CONFIRM POSITIVE SHEAR -PROVIDE PRESSURE TEST RESULTS TO SUPERINTENDENT AND RECIEVE AUTHORIZATION TO PROCEED SIMOPS:LAYING DOWN STANDS OF 4" DRILLPIPE OFFLINE 18:30 - 21:00 � 2.50 CASING P 10,566.00 RUNCMP REVERSE CIRCULATE 25 BBLS DIESEL FREEZE PROTECT DOWN THE IA -2.5 BPM,900 PSI -850'TBG AND IA -ALLOW DIESEL TO U-TUBE FOR 1 HOUR. LEAVING 7 BBLS DIESEL IN TUBING AND 18 BBLS DIESEL IN IA 21:00 - 21:30 0.50 CASING P 10,566.00 RUNCMP RIG SERVICE Printed 10/2/2017 1:50:09PM *All depths reported in Workover Depths" 0 North America-ALASKA-BP • Page 21 of 21 Operation Summary Report Common Well Name:P1-04 AFE No Event Type:WORKOVER(WO) Start Date:9/9/2017 End Date: IX4-014DC-E:(4,686,000.00) Project:Point McIntyre Site:Pt Mac 1 Rig Name/No.:PARKER 272 Spud Date/Time:5/11/1993 12:00:OOAM I Rig Release:9/23/2017 Rig Contractor PARKER DRILLING CO. I BPUOI:USA00001752 Active datum:7:04 5/11/1993 00:00©50.40usft(above Mean Sea Level) Date From-To Hrs Task Code NPT Total Depth Phase I Description of Operations (hr) (usft) — 21:30 - 22:30 1.00 CASING P 10,566.00 RUNCMP I INSTALL CIW 4"TYPE'H'TWC WITH DRY ROD I PER CAMERON REP I-PRESSURE TEST FROM ABOVE AND BELOW TO 3500 PSI HIGH FOR 5 CHARTED MINUTES I IEACH -TEST PASSES ACCORDING TO BP PRACTICE 100218,TABLE 2,ACCEPTANCE !I-CRITERIA 28 1-SEE ATTACHED CHART 22:30 - 00:00 1.50 CASING P I 10,566.00 RUNCMP I NIPPLE DOWN BOPE I -BLOW DOWN ALL LINES,BLOW OUT STACK I-REMOVE TURN BUCKLES I-PULL FLOW RISER I 1-RACK BACK BOP ON STUMP 9/23/2017 00:00 - 01:00 1.00 CASING j P 10,586,00 RUNCMP CONTINUE TO NIPPLE DOWN BOPE I I -CLEAN OUT TUBING HANGER '01:00 - 02:00 1.00 CASING P 10,566.00 RUNCMP IINIPPLE UPTREE AND ADAPTER FLANGE : � I-TORQUE BOLTS PER CAMERON REP 02:00 - 06:00 4.00 CASING P 10,566.00 I RUNCMP F TEST TUBING HANGER VOID AND SEAL TO I450G PSI FOR 15 MINUTES, '-RECIEVE SUPERINTENDENT APPROVAL TO PROCEED.PRESSURE TEST TREE TO 4500 ' I PSI FOR 5 MINUTES(LEAK TIGHT TEST). SECURE WELL -RDMO FROM P1-04 TO DS 14-16B !RELEASE RIG AT 06:00 HRS • Printed 10/2/2017 1:50:09PM *All depths reported in Workover Depths* c • r t UJ Q N -a o IW 0W W AO ?_-JjVco W O O "' Qc O. LLW = O = O O m Moo CO m~ CO I- t 0 0 N N CO Q W 6- W Z W !A 0 O ❑ p ai J O a Y cc O o W N v E Z E Z. i,%1 J 0 N Ja LL g n LL N 0 W O ro _ m 0 W 8en W co 2 .. > , o 7 7 7 7 co O E. N N tll W U m a Si I E _ m 0 § 0 lW m tlN S q v m c xc 8 cx c 8E ov c wo M o CD 2m ❑ ❑ w �wj or o0 o0 ° azo .-- ;.-_- aW c E O re cA Q X d c 0 0 iii " = O } 0 a y o a o ce o I a c m m co W CC d E c n ^ .0 a c D. in a •d m d 15 _) O !n 0 O O j- J m } 6 O F N r J ) as d E E 2 7 Co 1 p O. > U > a o re , E E o c E o 7 7 C a s u� 0 3 0 COCL w o c « a w > a (i N > 5 tE N Q qq N :9; Z N `65, N Z qQ O1 ❑ p ❑ W W CO d N ❑ W W Fin d t) rr J rn d o E ❑ IT < 0 n co 0 E CO N N a a o w �� m o rn o Z Y '� o w O o ¢ c. N R a co m ^ a a a m rn a a O n o N O O W r O O W W Z E E 0 dD O V O W co O 2 rte. ? W y O O O CJ O Co 0) O L ❑ N a E c. .. a Z > 0 m B 2' 1 w m a Q o m o m d• o m o 4 , > o iii > , > o iri co y (O 2 (4 N $2 N (/ u S O , ❑ C9 U o ❑ 0 2 a r y N MW (- UOWW V Z V 41 ? Woc) 2 .0o r i O Wm O Z J Qm S` U U O W M 0 r0 O z 'l J 0 W 2 w d d 0 W a' `r 0 1 to F cn ca o F 0 a co 0 ia 2 i> ❑ v(i {0 w U 0 z N E c Y w ^ E r CO m Y E in 0 o = 5 m 0 a c ac y W U o m c C d Q E .c N N co N N in c a U d > 8 a ai co a ? m a ig o •c m aci gy c-� �_a7 q F� Qm > FT Z o yc > c ja E GE) a Gj C D v 2 a a £1 -° 'cl a !n a 0 d W 0 m U U a c-jj� a' j.- al O M 0 v� a } CO O 2 0 M { U t L N j 3 g a N Q1 i n -a- 2 `1 E rE Q .c d C - Q m in§ 2LL o r ? a n' w o. <a J O C O N 11-5 U V E 0 ✓ O > �ta j S U x 8x8 x c N 0 m on 0 = - W Q m m S m Q> > ' u 6 * o o C7 a m tit a 0 0 0 0 0 0 o a e a 0 0 0 0 o N cn $ o m o o 0 U h O O N O co co O 0 O O ro as E Zli 0 E O ® a hC LL W U N E g• o •Z ° an o CO mwQ xi , m a rn V O `7 aLL ) .°� a o U 0 E . a c -o m = E c a1 CD a rn E ✓ IJ C (p N C C a cc al S } d Zn" 0 O o 2 fh a ti U m m v _ Y a am ❑ ,• 0 WotCa E (1> � aE , a &o v, 02EE a >> �Q C 1 @ yrty hE 0, E oo < o LL y o0 o a g x N m E o N :y o m e r Att Q1 r cm ¢ 73 m a as {.3 1 w �_ 9 a a s in ZW I� IT t° d Y `t1 N o o o A � .. o m ❑ H W• r y � cv p 01 Z E co a LL ui U as o '5- 1 1w v E " a cn { m E Iv J a o Z t LL a m WO m nig ¢ o i.).: u; � Z.Mci in co C V 13 Of 0) j ~ o. p of 2 V) .p M ' 2 LL E o oai 2 I w o p W E g Q CO 0 re o m o 2 a • O O o `s TA ,- Lu Z < LL d ❑ m W ¢ dLL 0 C m LU F- 0 m < LU LL � d E ¢ ❑ LL 0 O Ce LL ~ N 0 ¢ ❑ W Ja w2 v 2 W v Q 0 a1 a N M m o E as OU S I O Z lL O a 0 — J O F.. Z r o 0 N W O d 2 > ❑ iry co U E Iy 0 co W U N .E c Y w r F E. 0 E o m 5 CC Y o rc a z a '¢ 0 _ c CL `0 D E ad a LL F 1 0 W v C C U (0 oIQ > o a o m m n F t cc a ,U Ia w U CO ❑ ❑ 0 ❑ D O m o • • 150 i ; . co ifo ; z z at ) ) § / / | g k g / � zI .. §} fl / / ceco < x Et z 7.1 _ \ @ f, $ $ £ E - ) x z E. / a a z a a at ) I ' ® � k \ k ® o - \ g e A .2 5 2 5 s / ) ,42 k ) / ° { \ -6 .. y E 7 f C \ \ ¥ z ƒ — ® k k - 3 E 2 \ E � � 05 E \ � 00 � 41, _ © [ § | t o k / E ! 0 I _ .= o = e w .- X f k ! ( 'S G § / md z E a o # 7 ! 0- $ 1 E 0 z { a z a \ din £ f U a t ( f 0 co A ƒ Ci t - ` § § ) \ ) < z 5 Fc z 0 ( 2 § z LO es 0 k z k z z { o N. 3 X 4) 0 \ ` W n n \ •- in . | 2 3 > ° p z 1Y ) '0 k B k « 13 k 2 a .§ . § y y Uo § a , 2 -o k k ) § / ƒ ( ) ) § # $ 2 f e I �v ƒ 3 2 I � \ o k k ) § ) \ I § CE FEAD 4-1/16"CIW • P 1 p 4 SOY NOTES:***CHROME TBG&LNR*** ACTUATOR= CNV SH-3000 OKB.ELEV= 50' BF ELEV= 13.63' 20"GOND, -{ ? J KOP= 1152' # 2200' --14-1/2"HES X NP, D=3.813" Max Angie= 46°@ 6453' — Datum NO= 11185' D= " iDatum1VD= __-__.8800'SS i 3939' -I4-1/2"X 3-1/2'XO, D=2.992" 4-1/2"TBG,12.6#,13CR-85 VA TOP, - 3939' GAS LIFT MANDRELS .0152 bpf,ID=3.958" ST MD TVD DEV TYPE VLV LATCH FORT DATE 4 4302 3788 44 KGB-2-9 DOME NTG 16 10/05/17 10-314"CSG,45.5#,NT-80 NSCC,D=9.950" H 3982' IA :43 7139 5797 45 KGB-2-9 DONE INTG 20 10/05/17 7-5/8"X 5-1/2"INFO LTPw/HGR,D=4.810" --I 4001' 'I )r 2 8968 7138 43 KGB-2-9 DMY HVTG 0 10/05/17 1 9978 7893 41 KGB-2-9 DMY NTG 0 10/05/17 4 !■ 6060' HPC LEAK 4 4 , ' 10104' -13-1/2"HES X NP, D=2.813" Minimum ID = 2.75" @ 10234' 3-1/2" HES X NIPPLE c �_� 10135' H5-1/2"X3-1/2"HES TNT PKR,D=2.83" '4 I I 4 10171' -13-1/2"HES XNIP,13=2.813' ili : I I 10234' H 3-1/2"HES XN NP,D=2.75" 3-1/2"TBG,9.2#,13CR-85 VAM TOP, - 10293' .0087 bpf,ID=2.992" " 1 10293' H3-112"WLEG,13=2.992" 5-1/2"LNR,17#,L-80 VAM TOP, - 10392' ip .0232 P.ID=4.892" F 10392' _-15-1/2"X 4-1/2"XO,13=3.958" 4-1/2"TBG STUB(09/18/17) -I 10407' ` I Ili Oa Irle 10410' H7-5/8"X 4-1/2"UNIQUE OVERSHOT .4.040 a AI s 10446' -7-5/8"X 4-1/2"BKR SABL-3 PKR & w/K ANCHOR 0=3.87" I ' 10477' -14-1/2"PARKER SWS NP,D=3.813" 4-1/2"TBG, 12.6#,13CR-80 NSCT, - 10517' ' 10496' -I4-1/2"PARKER SWN NP,D=3.725" .0152 bpf,13=3.958" PERFORATION SUMMARY .—_1 10617' H4-1/2"WLEG,D=4.00" REF LOG: ATLAS DLUGR ON 05/22/93 10500' -)EMD TT LOGGED 06/12/93 ANGLE AT TOP PERF: 33°@ 11024' -10567' -I FISH:COMPOSITE PLUG(09/21/17) Nate:Refer to Production DB for historical pert data SIZE SPF NTERVAL Opn/Sqz SHOT SQZ 2-7/8" 6 11024-11044 0 05/23/04 g 11017' -17-5/8'MARKER JOINTS(2 EACH) 3-3/8" 6 11070-11090 0 08/19/93 - 6 11120-11230 0 08/19/93 1-1 2-7/8" 6 11190-11210 0 05/23/04 3-3/8" 6 11250-11335 0 08/19/93 2-7/8" 6 11290-11330 0 05/22/04 2-7/8" 6 11355-11375 0 05/22/04 3-3/8" 6 11355-11460 0 08/19/93 Ilk 11486'CTM -I FISH:3-3/8"CROSS-FLOW 13P(03/16/16) PBTD H 11611' 1111111111 11111111111111111111, 7-5/8"CSG,29.7#,13CR-95 NSCC, -I 11588' i1itt1a1a1s1s1a1a184, .0459 bpf,D=6.875' DATE REV BY COMMENTS DATE REV BY CONVENTS PONT MCNTYRE UNIT 05127/93 POOL 7 ORIGINAL COMPLETION WELL: PI-04 09/23/17 P-272 WO PERMIT MK 9930630 09/27/17 JND DRLG HO CORRECTIONS API No: 50-029-22366-00 09/28/17 JUJND FINAL ODEAFPROVAL SEC 16,T12N,R14E,1463'FSL&681'EEL 10/10/17 JNUJND ADDED FISH(09/21/17) 10/10/17 CJN/JMD GLV C/O(10/05/17) BP Exploration(Alaska) s • 0 STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report *AII BOPE reports are due to the agency within 5 days of testing* Submit to:jim.reggalaska.gov;AOGCC.Inspectorsa,alaska.gov; phoebe.brooks a(�.alaska.bov ..Contractor: Parker Rig No.: 272 DATE: 9/15/17 Rig Rep.: Devon Henson Rig Phone: 907-685-4801 Operator: B.P. Op. Phone: 907-685-4802 Rep.: Blair Neufeld E-Mail rig272srmgra@.parkerdriilinq.com Well Name: PBU P1-04 - PTD# 1930630 - Sundry# 317-239 - Operation: Drilling: Workover: x Explor.: Test: Initial: x Weekly: Bi-Weekly: Test Pressure(psi): Rams: 250/3500 - Annular: 250/3500 - Valves: 250/3500 ' MASP: 3178 MISC. INSPECTIONS: TEST DATA FLOOR SAFETY VALVES: Test Result Test Result Quantity Test Result Location Gen. P Well Sign P - Upper Kelly 1 • P Housekeeping P - Rig P - Lower Kelly 1 • P - PTD On Location P Hazard Sec. P - Ball Type 4 • P Standing Order Posted P Misc. NA Inside BOP 2 - P FSV Misc 0 NA BOP STACK: Quantity Size/Type Test Result MUD SYSTEM: Visual Alarm Stripper 0 NA Trip Tank P P - Annular Preventer 1 ` 13-5/8" - P - Pit Level Indicators P P - #1 Rams 1 3 1/2"x5 1/2" - P - Flow Indicator P • P - #2 Rams 1 - Blind/Shear . P , Meth Gas Detector P ' P #3 Rams 1 . 3 1/2"x 5 1/2" • P • H2S Gas Detector P - P #4 Rams 0 NA MS Misc 0 NA #5 Rams 0 NA #6 Rams 0 NA Quantity Test Result Choke Ln.Valves 1 3-1/8" - P • Inside Reel valves 0 NA HCR Valves 2 3-1/8" R P Kill Line Valves 2 3-1/8", 2-1/16" , P Check Valve 0 NA ACCUMULATOR SYSTEM: BOP Misc 0 NA Time/Pressure Test Result System Pressure(psi) 3050 - P CHOKE MANIFOLD: Pressure After Closure(psi) 2050 - P - Quantity Test Result 200 psi Attained(sec) 18 - P No.Valves 15 - P _ Full Pressure Attained(sec) 68 _ P . Manual Chokes 1 - P _ Blind Switch Covers: All stations Yes Hydraulic Chokes 1 - P • Nitgn. Bottles#&psi(Avg.): 14 @2078 P CH Misc 0 NA ACC Misc 0 NA Test Results Number of Failures: 0 ✓ Test Time: 3.5 Hours Repair or replacement of equipment will be made within NA days. Notify the AOGCC of repairs with written confirmation to:AOGCC.Inspectors@alaska.gov Remarks: The test was conducted with 4"and 5 1/2"test joints,All components were functioned from the Rig Managers Office,Accumulator Room, &LER/Drillers Room. Leak in tubing hanger�revented BOP test as originally planned; AOGCC approval granted 2:17 PM on 9/14/17 to perform rolling test to 3500 psi and pull hanger to floor.Test plug was then'installed in wellhead and used as hard bottom for full BOP test. AOGCC Inspection 24 hr Notice Yes Date/Time 9-12-17© 17:05 Waived By Guy Cook Test Start Date/Time: 9/15/2017 16:30 (date) (time) Witness Test Finish Date/Time: 9/15/2017 20:00 - SCANNED FEE 0 g '2i:1 Form 10-424(Revised 03/2017) BOP Parker272 9-15-17 • • Regg, James B (DOA) From: Rig 272 Senior Manager <rig272srmgr@parkerdrilling.com> `� Sent: Monday, September 18, 2017 7:51 AM '16f1 To: Regg, James B (DOA); DOA AOGCC Prudhoe Bay; Brooks, Phoebe L (DOA) Cc: akdcrig272wellsiteleader@bp.com Subject: 272 Rolling test chart 9-15-17 Attachments: Rolling Test Chart 9-15-17 .pdf Please see attached test chart, this was a rolling test as we could not get a test on the hanger. Regards Devon Henson Sr. Rig Manager Parker Drilling Rig 272 Office 907-685-4801 Cell 907-252-3707 rig272srmgr@parkerdrilling.com NOTICE BY Parker Drilling Company This message, as well as any attached document, contains information from Parker Drilling Company that is confidential and/or privileged.The information is intended only for the use of the addressee named above. If you are not the intended recipient,you are hereby notified that any use, disclosure, copying, distribution or the taking of any action in reliance on the contents of this message or its attachments is strictly prohibited, and may be unlawful. If you have received this message in error, please delete all electronic copies of this message and its attachments, if any, destroy any hard copies you may have created, without disclosing the contents, and notify the sender immediately. Unless expressly stated otherwise, nothing contained in this message should be construed as a digital or electronic signature, nor is it intended to reflect an intention to make an agreement by electronic means. 1 4 • • •••••°....°°.°'....'.......1 FR ./,/. .. .0°' wo .°a....°a w.'."n.° ■.° ..v2' ....°° n.° =v°1P. . '''', A' "'",.....Z......a.mA.. ..ftz. ,.-.*".°"'''``. .-' 7 g° 1/. .°° .....1 oa cz'"" ,°... 4 4*." `..' %*%" .. ., •.. 7 #7// i :#/ ;t°'1°.7' 4 .44* /tto/ y ,A s ---4,--- ...i............... /he ei ere A .'?... ---=........---.4= \ •J...1:. -. .'"."--- ----....„-"*.r.P. 4:07.,: . %Of"likke11111111141111114,3.0"w* 1110110144 0--.Z4 % - W \\\ tar% itillitelliiWilf,, o ♦ IV aVis11140$i , � • 41 Me �m tr 1 , \\AttiagrVIV14 *47 � � uil1t �11 � 41 d1fU1 � \\NCIaVete--1:: 0 :. ,•.,=*- ----z..;:-.4•_.- 444111/0/1 -kiit-,=. --.:-. ..=--. ..-t_ -‘ 000 •A.„:447.......-------4------...0„ q* ft* , 44-- --••••_;- o/ ff/ .A........ ......-=.........: , : . mo . / je N. , , 0. ,.. ..,,.4,- . ,....---___.:......... ........................................ ...... * 1 • PTO 193 -0' 3 Loepp, Victoria T (DOA) From: Regg,James B (DOA) Sent: Thursday, September 14, 2017 5:23 PM To: Leemhuis,Jacob (Jacob.Leemhuis@bp.com) Cc: DOA AOGCC Prudhoe Bay; Daniel, Ryan; Loepp,Victoria T(DOA) Subject: RE:APPROVAL REQUESTED: P1-04 RWO - Sundry#317-239 Follow Up Flag: Follow up Flag Status: Flagged Results of both rolling test and other associated BOPE testing is to be documented on a single BOPE test report.Also send copies of charts for both the rolling and normal pressure tests. Sent from my Samsung Galaxy smartphone. SCONE) -"° ` } Original message From: "Loepp,Victoria T(DOA)"<victoria.loepp@alaska.gov> Date:09/14/2017 2:16 PM(GMT-09:00) To: "Daniel, Ryan"<Ryan.Daniel@bp.com>, "Regg,James B(DOA)"<jim.regg@alaska.gov> Cc: "Leemhuis,Jacob(Jacob.Leemhuis@bp.com)"<Jacob.leemhuis@bp.com>, DOA AOGCC Prudhoe Bay <doa.aogcc.prudhoe.bay@alaska.gov> Subject: RE:APPROVAL REQUESTED: P1-04 RWO-Sundry#317-239 Jacob, Ryan, Approval is granted to proceed with a rolling leak tight test on the BOPE to 3500 psig and to pull the 4-1/2"tubing. Testing of the BOPE is expected in 4-6 hours of starting to unseat the tubing hanger. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loeori alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victorialoem@alaska.gov From: Daniel, Ryan [mailto:Ryan.Daniel@bp.com] Sent:Thursday,September 14,2017 2:01 PM 1 . To: Loepp,Victoria T(DOA)<victoria.oepp@alaska.gov>; Regg,James B(DOA)<jim.regg@alaska.gov> Subject:APPROVAL REQUESTED: P1-04 RWO-Sundry#317-239 Importance:High Good Afternoon Victoria,Jim, Please review Jacobs note below and request on the P1-04 Workover.We are currently at a hold point and will not proceed until we have AOGCC approval. Please call me on 907 7481140 if you have any questions. Thanks Ryan From: Leemhuis,Jacob September Sent:Thursday, 14,2017 1:53 PM To: Daniel, Ryan<Ryan.Daniel@bp.com> Cc:Schiavenato,Carlos F<schiavcc@BP.com>; Egbejimba, Uchenna 1<John.Egbejimba@uk.bp.com> Subject:P1-04 RWO-Sundry#317-239 Ryan, Current Status: There is a Production Casing Leak at 6050' MD and a hole in the tubing at 6048' MD. The BOPE are currently nippled up on the well with the following configuration: • Annular • 3-1/2"x 5-1/2"VBRs • Blind/Shear • 3-1/2"x 5-1/2"VBRs We currently cannot get a shell test on the BOP due to a leak somewhere in the tubing hanger. The most likely leak path is through the control line port on tubing hanger and won't be able to achieve a BOPE test until this is out of the ground. We have a BPV with a blanking plug in the wellhead and have tested the BPV with a rolling test to 500 psi and tested the blanking plug with a solid piece of pipe to 3500 psi—both good tests. We are currently filling across the top maintaining a hole fill volume with a loss rate of 4 bbls/hr. The fluid in the wellbore is 9.8 ppg brine with a 8.9 ppg pore pressure. This provides^'430 psi overbalance to the formation. Requesting Approval: We are requesting to pull 4-1/2"tubing after we get a rolling leak tight test to 3500 psi on our BOPE. We will test the BOPE at the earliest operational opportunity(within 4-6 hours of starting to unseat tubing hanger). The state inspectors will be continually updated on the progress leading up to the BOPE test. Thanks, Jacob C. Leemhuis GWO ( BP Alaska I Drilling Engineer Mobile:+1 (907)223-6792 I Office:+1 (907)564-4989 Lync:+1 (832)787-3231 I Office 7556 2 • Loepp, Victoria T (DOA) From: Daniel, Ryan <Ryan.Daniel@bp.com> Sent: Thursday, September 14, 2017 2:25 PM To: Loepp,Victoria T(DOA); Regg,James B (DOA) Cc: Leemhuis,Jacob; DOA AOGCC Prudhoe Bay Subject: RE:APPROVAL REQUESTED: P1-04 RWO - Sundry#317-239 Follow Up Flag: Follow up Flag Status: Flagged Thanks Victoria,Jim, Rgds Ryan From: Loepp,Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent:Thursday,September 14,2017 2:17 PM To: Daniel, Ryan<Ryan.Daniel@bp.com>; Regg,James B(DOA)<jim.regg@alaska.gov> Cc:Leemhuis,Jacob<Jacob.Leemhuis@bp.com>; DOA AOGCC Prudhoe Bay<doa.aogcc.prudhoe.bay@alaska.gov> Subject: RE:APPROVAL REQUESTED: P1-04 RWO-Sundry#317-239 Jacob, Ryan, Approval is granted to proceed with a rolling leak tight test on the BOPE to 3500 psig and to pull the 4-1/2"tubing. Testing of the BOPE is expected in 4-6 hours of starting to unseat the tubing hanger. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.LoeppCa�alaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.Loepp@alaska.gov From: Daniel, Ryan [mailto:Ryan.Daniel@bp.com] Sent:Thursday,September 14,2017 2:01 PM To: Loepp,Victoria T(DOA)<victoria.loepp@alaska.gov>; Regg,James B(DOA)<iim.regg@alaska.gov> Subject:APPROVAL REQUESTED: P1-04 RWO-Sundry#317-239 Importance: High Good Afternoon Victoria,Jim, 1 • Please review Jacobs note below and request on the P1-04 Workover.We are currently at a hold point and will not proceed until we have AOGCC approval. Please call me on 907 7481140 if you have any questions. Thanks Ryan From: Leemhuis,Jacob Sent:Thursday,September 14,2017 1:53 PM To: Daniel, Ryan<Ryan.Daniel@bp.com> Cc:Schiavenato,Carlos F<schiavcc@BP.com>; Egbejimba, Uchenna J<John.Egbeiimba@uk.bp.com> Subject:P1-04 RWO-Sundry#317-239 Ryan, Current Status: There is a Production Casing Leak at 6050' MD and a hole in the tubing at 6048' MD. The BOPE are currently nippled up on the well with the following configuration: • Annular • 3-1/2"x 5-1/2"VBRs • Blind/Shear • 3-1/2"x 5-1/2"VBRs We currently cannot get a shell test on the BOP due to a leak somewhere in the tubing hanger. The most likely leak path is through the control line port on tubing hanger and won't be able to achieve a BOPE test until this is out of the ground. We have a BPV with a blanking plug in the wellhead and have tested the BPV with a rolling test to 500 psi and tested the blanking plug with a solid piece of pipe to 3500 psi—both good tests. We are currently filling across the top maintaining a hole fill volume with a loss rate of 4 bbls/hr. The fluid in the wellbore is 9.8 ppg brine with a 8.9 ppg pore pressure. This provides^'430 psi overbalance to the formation. Requesting Approval: We are requesting to pull 4-1/2"tubing after we get a rolling leak tight test to 3500 psi on our BOPE. We will test the BOPE at the earliest operational opportunity(within 4-6 hours of starting to unseat tubing hanger). The state inspectors will be continually updated on the progress leading up to the BOPE test. Thanks, Jacob C. Leemhuis GWO I BP Alaska Drilling Engineer— I Mobile:+1 (907)223-6792 I Office:+1 (907)564-4989 Lync:+1 (832)787-3231 I Office 7556 2 • Loepp. Victoria T (DOA) From: Leemhuis,Jacob <Jacob.Leemhuis@bp.com> Sent: Wednesday, September 13,2017 9:44 AM To: Loepp,Victoria T(DOA) Subject: Sundry 317-239 - P1-04 RWO Ram Configuration Follow Up Flag: Follow up Flag Status: Flagged Victoria, The original sundry was submitted with the following BOPE ram configuration: • Annular • 3W x 5W VBRs • Blind/Shears • 2W x 5"VBR's To comply with AOGCC Regulation 20.AAC 25.285(B),we will be updating our initial BOPE configuration to: • Annular • 31A"x 5'/:"VBRs • Blind/Shears • 31A"x 51/2"VBR's The MASP on this well is 3103 psi. Please let me know if there is anything else required. Thanks, Jacob C. Leemhuis GWO I BP Alaska I Drilling Engineer— I Mobile:+1 (907)223-6792 I Office:+1 (907)564-4989 I Lync:+1 (832)787-3231 I Office 755B 1 p T-D o63 • Kt3 - o‘3 Loepp, Victoria T (DOA) From: Lastufka,Joseph N <Joseph.Lastufka@bp.com> Sent: Thursday,August 03,2017 1:26 PM To: Loepp,Victoria T(DOA) Cc: Leemhuis,Jacob Subject: FW: New Parker NOV 6012 BOP Stack Attachments: 6012 BOP STACK.PDF;Shear Chart-7.28.17 new.xlsx; NOV 6012 Ram Sizes 08-03-17.xlsx Follow Up Flag: Follow up Flag Status: Flagged Victoria, 1q3 063 Please update the sundry#317-239 for P1-04(PTD#19 and replace the previous BOP sketch to this one. The rams sizes are also different then what we had listed. • Annular • 3-1/2"x 5-1/2"VBRs • Blind/Shear • 2-7/8"x 5"VBRs I'll be sending you a list of approved sidetracks which will have a configuration change at some point as well. Thank you, Joe Lastufka Information and Data Controller ` OO* Cell: (907) 227-84961 Office: (907) 564-4091 vivo liegnilif BP Exploration AlaskaI900 E. Benson Blvd.IRoom: 788D1Anchorage, AK 1 • NOV 6012 Stack-13-5/8"x 5 K Ram Type Size Blind/Shear Upper Blind/Shear Lower VBR 2-7/8"x 5" VBR 3-1/2"x 5-1/2" Pipe 2-3/8" Pipe 5" Pipe 7" Pipe 7-5/8" Pipe 9-5/8" • • SHEAR CHART FOR NOV 6012 3-1/2" MANUAL LOCK W/ 11" BOOSTER Pipe Data Hydraulic Pressure Required for Shearing(psi) Pipe OD Weight ID Wellbore Pressure Grade Description in lb/ft in 0 psi 5000 psi Drill Pipe 2 7/8 10.4 S-135 2.151 1311 1592 Drill Pipe 4 14.0 S-135 3.34 1915 2196 Drill Pipe 5 19.5 S-135 4.276 2264 2545 Tubing 2 3/8 4.7 L80 1.995 367 648 Tubing 2 7/8 6.5 L80 2.441 510 791 Tubing 31/2 9.3 L80 2.992 729 1009 Tubing 41/2 12.6 L80 3.958 1013 1294 Tubing 51/2 17.0 L80 4.892 1396 1677 Casing 51/2 17.0 N-80 4.892 1469 1750 IN THE EVENT THAT YOU ARE SHEARING, MOVE THE HIGH LOW BY PASS INTO HIGH POSITION FOR ALL PIPE SIZES SHOWN. ALL OTHER PIPE NOT LISTED IS NON-SHEARABLE • • 0 x e 0 wg K W 1 3 '''ISS 3 id i ill :Ili _11! 1 I , • "s41; rE ; n:.#xa pitak l3aiM AiAgg tamp 11,1%. %__ %.tr$, LL,''=,7,, ::; 44 �.n.� W I a g si., , ,i, _________ 1 li 11 PI 5 r n , , _II gaa gagi ,: it E p! !! y! .;. �-. U ++-' ;I I) I- ()a 1 MN fi , �>, g « I L I 1m pis 0 II! W I $off li 6 CN .9-A XI m a (1 310 roe ■'J 501 t.9o .,—,LZ , 0 f' _, S-A .11-.0 d/l o1-.t2 - ^/� 2. g: .i/,9-.51_, ,. W Oa or zit 40"\\ 177,',& THE STATE Alaska Oil and Gas �, of LAsKA Conservation Commission _ Sff=== 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 (4 ,A SSP Fax: 907.276.7542 www.aogcc.alaska.gov Uchenna Egbejimba w JUL 2 72(117, Engineering Team Leader BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Pt. McIntyre Oil Pool, PBU P1-04 Permit to Drill Number: 193-063 Sundry Number: 317-239 Dear Mr. Egbejimba: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Hollis S. French Chair k� DATED this P -day of July, 2017. RBDMS V JUL 1 1 2017 STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMMI N • APPLICATION FOR SUNDRY APPROV S 20 AAC 25.280 1. Type of Request: Abandon 0 Plug Perforations ❑ Fracture Stimulate 0 Repair Well H- Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Pull Tubing p" Change Approved Program 0 Plug for Redrill ❑ Perforate New Pool 0 Re-enter Susp Well 0 Alter Casing I1 • Other Scab Liner 11 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number 193-063 • Exploratory 0 Development I . 3. Address: P.O.Box 196612 Anchorage,AK 6. API Number: 50-029-22366-00-00 99519-6612 Stratigraphic 0 Service ❑ • 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes 0 No I3- PBU P1-04 • IV 9. Property Designation(Lease Number): 10. Field/Pools: ADL 028297 PRUDHOE BAY,PT MCINTYRE OIL JUN 1 2 2017 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth ND: MPSP(psi): z Plugs(MD): AOGCC tlVitL',,, 11600 - 9215 • 10495 8285 3178 10495 114861 Casing Length Size MD TVD Burst Collapse Structural Conductor 74 20" 41-115 41-115 2300 520 Surface 3941 10-3/4" 39-3980 39-3551 4560 1730 Intermediate Production 11549 7-5/8" 37-11586 37-9202 8180/6890 5120/4790 Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 11024-11460 8714-9091 4-1/2"12.6# 13Cr80 35-10517 Packers and SSSV Type: 4-1/2"Baker SABL-3 Packer Packers and SSSV MD(ft)and TVD(ft): 10447/8248 4-1/2"Camco TRCF-4A SSSV 2321/2242 12.Attachments: Proposal Summary p Wellbore Schematic p 13.Well Class after proposed work: Detailed Operations Program 0 BOP Sketch p Exploratory 0 Stratigraphic 0 Development p • Service 0 14.Estimated Date for Commencing Operations: October 1,2017 15. Well Status after proposed work: , Oil ® • WINJ 0 WDSPL 0 Suspended 0 16.Verbal Approval: Date: GAS 0 WAG 0 GSTOR 0 SPLUG 0 Commission Representative: GINJ 0 Op Shutdown 0 Abandoned 0 17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Leemhuis,Jacob be deviated from without prior written approval. Contact Email: Jacob.Leemhuis@bp.com Authorized Name: Egbejimba,Uchenna J Contact Phone: +1 907 564 4989 Authorized Title: EngineeringinTeam Leader-CTD&RWO Authorized Signature: ..,i/. '!, •• .� Date: /8'�a 01 �J !/� COMMISSION USE ONLY / Conditions of approval:Notify Commission so that a representative may witness Sundry Number: .3 ti_ 23 Plug Integrity 0 BOP Test OK- Mechanical Integrity Test 0 Location Clearance 0 Other: gap t---,-„5 -/-- fo 3 Sci o p 5-L-2 1'1sr�R r p1—��t y,.IJ/Z ✓ 5-v 2,6---6 c., es I-)Post Initial Injection MIT Req'd? Yes 0 No Spacing Exception Required? Yes 0 No I3 Subsequent Form Required: /6' —401 by: APPROVED BYTHE " L's I`� Approved OMMISSIONER COMMISSION Date: vr` 71307 - ? _3_17 ORIGINAL RBDMS I-- J11 1 1 2017 Submit Form and Form 10-403 Revised 04/2017 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate bp . 0 Sundry Request for Casing Repair Well: P1-04 Date: 6/8/2017 Engineer: Jacob Leemhuis MASP: 3178 psi Well Type: Producer Estimated Start date: October 2017 History: P1-04 was drilled into the Kuparuk formation 05/1993 and produced as a GDWFI producer. It has been flowed into HP service the majority of life being choked to manage GOR initially then water and GOR in later life. In 2015 P1-04 was Sjjor a tubing and PC leak_at around 6.Q50'. A sundry for IA squeeze job to repair both holes was submitted to the AOGCC but denied. The depletion strategy for Pt McIntyre is to maintain lurid contacts and pressures in the field, so it is not expected that this well would need full time G/L but installation of GL mandrels is requested for kick-off and in the case that depletion strategy changes and the well requires full-time GL in the future. This well is SI non-operable waiting on RWO to repair both tubing and PC leak via scab liner and new tubing. Scope of Work: The primary objective of this RWO is to restore well integrity and return the well to V operable status. Pre Rig Prep Work: W 1 Check all LDS for movement; PPPOT-T to 5,000 psi and PPPOT-IC to 3,500 psi. S 2 Pull PXN plug, SBHPS, set composite plug at—10,454' MD F 3 MIT-OA to 1200 psi E 4 RCT cut the 4-1/2"tubing at— 10,405' MD F 5 Circulate well with 9.8 ppg brine and Diesel F/P to 500'. ✓ 6 Set a BPV. ND the tree, NU the dry hole tree, PB IA and upper OA valves O 7 Remove the well house &flow line. Level the pad as needed for the rig. Proposed RWO Procedure: • MIRU Parker 272. Pull BPV. Circulate KWF. Set TWC. • ND tree. NU and test BOPE with four preventers configured top down (annular, 2-7/8"x 5-1/2" VBR's, blind shears,mud cross and 2-7/8"x 5-1/2"VBR's). Test the blind and VBR's to 3500 psi ✓' and the annular to 3500 psi. Pull TWC. • Pull 4-1/2" L-80 tubing from jet cut—10,454' MD. • Perform a RTTS packer run. Set RTTS at—4500' MD and pressure test the backside to 3500 psi (this will pressure test the casing from 4500' to surface to ensure that casing is good) • RIH with dress off assembly, scrape casing and dress off tubing stub • Run a 5-1/2" 17#L-80 Scab liner from PBTD to 4000' MD. • Cement the scab liner with 116.7 bbls (106 bbls + 0.7 bbl shoe track+ 10 bbls excess) of 15.8 ppg class G cement • Replace IC packoff and test, if casing growth is not present • Pressure test scab liner to 3500 psi ` ' • Drill out shoe tract and composite plug • Run new 4-1/2"x 3-1/2" completion with 5-1/2"x 3-Y2" HES"TNT" packer. MIT-T& MIT-IA to V 3500 psi. • Set a TWC and RDMO. Post ri Work ✓ 1 Pull TWC S 2 Pull ball and Rod, Pull RHC seat, Set KO GL design 1I-fht= 4-1/16"CE VNELLFEAD=. CIW • S NOTES: ACTUATOR= OTIS P 1 -0 9' OKB ELEV= 50A' BF,H_EV= I I KOP= 1152' / Max Angle= 46 @ 6453' -"CONDUCTOR H ? 2321' H4-1/2"CAMOD TRCF sssv, D=3.812' Datum MD= 11185' _#, Datum ND= 8800'SS 0_ " T t„ 1' IVU 31 10-3/4"CSG,45.5#,NT-80 NSCC,D=9.953" H 3982' GAS LIFT MANDRELS ST MD ND DEV TY FE VLV LATCH PORT DATE i liti 1 4783 4139 44 KBMG DMY BK 0 03/19/16 'VP() 2 8087 6488 42 KBMG DMY BK 0 03/19/16 3 10315 8147 40 KBMG DMY BK 0 04/26/03 Minimum ID =3.725" @ 10494' �e4Ic-G-0.5-c? 4-1/2" PARKER SWN NIPPLE I I 10377' H4-1/2"BKR"CAR/SLD SLv,D=3.812" Velifik/45'c2. ---;'-'—vv: 10446' -7-5/8"X 4-1/2"BKR SABL-3 PKR w/KANCHOR,D=3.87" v."- v✓�' 69`�'A„ , ' 10477' -I4-1/2"PARKER SWS IMP,13 3.813" 11111\,.....1 10495' --14-112"PARKER SWN M',D=3.725" 10495' -4-1/2"PXN PLUG(03/21/16) 4-1/2"TBG, 12.64,13CR-80 NSCT, H 10516' / ‘-I 10517' H4-1/2"WLEG,D=4.00' .0152 bpf,ID=3.958' 10500' H EL MD TT LOGGED 06/12/93 • 10117' -17"MARKER JON-TS(2 EACH) • PERFORATION SUMMARY REF LOG: ATLAS DLUGR ON 05/22/93 ANGLE AT TOP FERE: 33'@ 11024' I Note:Refer to Production DB for historical perf data ' SIZE SPF INTERVAL Opn/Sgz SHOT SOZ 2-7/8' 6 11024-11044 0 05/23/04 ' 3-3/8" 6 11070-11090 0 08/19/93 3-3/8" 6 11120-11230 0 08/19/93 I 2-7/8" 6 11190- 11210 0 05/23/04 I 3-3/8" 6 11250-11335 0 08/19/93 2-7/8' 6 11290- 11330 0 05/22/04 I 2-7/8" 6 11355-11375 0 05/22/04 3-3/8" 6 11355-11460 0 08/19/93 ' I 11486'CTM FISH:3-3/8"CROSS-FLOW IBP(03/16/16) PBTD H 11511' 1111111111 111111111111111111111 7-5/8'CSG,29.7#,13CR-95 NSCC, -I 11588' 1.1.1.1.1.1.1.1.1.1.1: .0459 bpf,D=6.875" DATE REV BY COMvU'TTS DATE REV BY COMMENTS POINT MC fT Y RE UNIT 05/27/93 POOL 7 ORIGINAL COMPLETION 11/03/15 RCT/JMD GLV C/O(11/01/15) Vi/I31.: P1-04 04/11/03 JJ/KAK GLV CJO 03/21/16TFA/JM?PULEDBP1SETFISH(03/16/16) FERMI No:'1930630 04/26/03 JM9'P GLV CJO 03/22/16 JMG/JMD SET PXN FLUG(03/21/16) API No. 50-029-22366-00 05/23/04 MIAIKAK ADPERFS 03/25/16 SWC/JM:GLV CIO(03/19/16) SEC 16,T12N,R14E,1463'FSL&681'FEL 03/18/09 RLW/SV PERF CORRECMONS 08/15/14 PJC SET IBP(08/05/14) BP Bcpioration(Alaska) TREE= 4-1/16"CIE C WB LHEAD=. NV • S NOTES: A P1 -04 ACTUATOR= OTIS Proposed OKE.ELEV= 50.4' BF.B.EV= I —K-OP= _ 1152' Max Angle-- 46 @ 6453' "CONDUCTOR, H ? Datum MD= _11185' _#, 17:71) 4-1/2" TRSV HES WellStar-2200' Datum 1V D=_.. 8800'SS D= ^ 4-1/2",12.6#, 13Cr, VamTop 10-3/4"CSG,45.5#,NT-80 NSCC,D=9.953" — 3982' —, --�. 4-1/2" x 5-1/2" xover 3950' WFD 7-5/8" x 5-1/2" LTP and HGR 4,000 t1 Gas Lift Mandrels 3-1/2" X, ID=2.813" • —PC leak at 6050' 5-1/2" x 3-1/2" HES TNT 3-1/2" X, I D=2.813" PKR, I D=2.83" 10,150' 3-1/2" XN, ID=2.75" 5-1/2" 17#, L-80, VamTop, 5-1/2" x 4-1/2" xover 3-1/2" 9.2#, 13Cr,VamTop 10,300'/ ---7-5/8' x 4-1/2" t. due Overshot 4-1/2" TBG STUB 10,405' S` 10446' -j7-5/8"X4-1/2"BKRSABL-3 PKR w/KANCHOR,D=3.87" Om- 4-1/2" Composite Plug at -10,454' 10477' --14-1/2"PARKER SWS NP,D=3.813" 10495' H4-1/2"PARKER SWN NP,D=3.725" 4-112"TBG,12.6#,13CR-80 NSCT, —H 10516' ` 1051T H4-1/2"WLEG,ID=4.00" .0152 bpf,ID=3.958" 10500' E-MD TT LOGGED 06/12/93 • 10117' H7"MARKER JONTS(2 EACH) • PERFORATION SUMMARY REF LOG: ATLAS DLUGR ON 05/22/93 ANGLE AT TOP PERF: 33`@ 11024' ' Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 2-7/8" 6 11024-11044 0 05/23/04 3-3/8" 6 11070-11090 0 08/19/93 3-3/8" 6 11120-11230 0 08/19/93 ' 2-7/8" 6 11190-11210 0 05/23/04 3-3/8" 6 11250-11335 0 08/19/93 2-7/8" 6 11290-11330 0 05/22/04 2-7/8" 6 11355-11375 0 05/22/04 3-3/8" 6 11355-11460 0 08/19/93 1 11486'CTM H FISH:3-3/8'CROSS-FLOW IBP(03/16/16) PBTD —i 11511' 1111111111 111111111111111111/11$ 7-5/8"CSG,29.7#,13CR-95 NSCC, H 11588' _0459 bpf,D=6.875" DATE REV BY C OMvENTS DATE REV BY COMMENTS POINT MCINTY RE UNrT 05/27/93 POOL 7 ORIGINAL COMPLETION 11/03/15 RCT/JWD GLV C/O(11/01/15) WELL: P1-04 04/11/03 JJ/KAK GLV GO 03/21/16 TFA/JMD PILLED BASET FISH(03/16/16) PERMIT No:"1930630 04/26/03 JM'TP GLV C/O 03/22/16 JM3/J4,13 SET PXN RUG(03/21/16) AR No: 50-029-22366-00 05/23/04 M1A/KAK ADPERFS 03/25/16 SWGJMC GLV GO(03/19/16) SEC 16,T12N,R14E,1463'FSL&681'F8 03/18/09 RLW/SV PERF CORRECTIONS 08/15/14 PJC SET IBP(08/05/14) BP Exploration(Alaska) • • PARKER 272 BOP STACK RAM TYPE BOP: DUTCH LOCK DOWN FLANGE SHAFFER LXT DOUBLE BOP 13 5/8"-5M I 13 5/8"-5M STUDDED TOP _ 13 5/8"-5M FLANGED BOTTOM ANNULAR BOP: W/(2) 14" UL2 OPERATOR, UPPER CAVITY 0/ SHAFFER LXT 13 5/8"-5M AND (2) 14" PSLK W/BSTR OPERATOR, r1f"ltrrl"-"trrl 13-5/8" 5M STUDDED TOP LOWER CAVITY 0 13-5/8" 5M FLANGED BOTTOM 0 1 I DRILLING CROSS: 1 1 13 5/8"-5M FLANGED TOP • �II �-o- I 1] 13 5/8"-5M FLANGED BOTTOM IE' �. . °°°°"0 3 W (2) 3 1/8"-5M SIDE OUTLETS • ° ° . r - II ; e ,°G I L .. ..... • r I 1 KILL LINE: .r� � 1 �OAvelI,� :15 -43- � � 2-1/16" 5M FLEX HOSE Q� �1 �I �� 1a ;S 2-1/16" 5M X 3-1/8" 5M D.S.A. `I�� 3-1/8" 5M FLANGED MANUAL GATE VALVE • L,m 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE --) • E o • 3 E •- • o o • P 10 °° , I 1 CHOKE LINE: RAM TYPE BOP: 3-1/8" 5M FLANGED MANUAL GATE VALVE SHAFFER LXT SINGLE 13 5/8" 5M 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE 13 5/8"-5M STUDDED TOP 5M FLEX HOSE 13 5/8"- 5M FLANGED BOTTOM 3-1/8" W/(2) 14" UL2 OPERATOR • 0 21-b 2,1 c!---, ---- ,c- . 11-1 WELL LOG TRANSMITTAL PROACTIVE DIAGNOSTIC SERVICES, INC. To: AOGCC RECEIVED Makana Bender DATA LOGGEl, 333 W. 7th Ave APR 06 2016 H/` Suite 100 BENDER Anchorage, Alaska 99501 (907) 793-1225 AOGCC RE : Cased Hole/Open Hole/Mechanical Logs and /or Tubing Inspection(Caliper/MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of : BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Analisa Steger LR2— 1 900 Benson Blvd. Anchorage,AK 99508 oancodc@bo.com and ProActive Diagnostic Services, Inc. Attn: Diane F. Williams 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245-8952 1) Leak Detection - SRO 23-Mar-16 P1-04 BL/CD 50-029-22366-00 2) Signed : / 6_,„,feet Date : Print Name: PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-8952 E-MAIL: PDSANCHORAGE(p MEMORYLOG.COM WEBSITE:WWW.MEMORYLOG.COM D:\Achives\MasterTemplateFiles\Templates\Distribution\TransmittalSheets\BP Transmit.docx \C SCD. • . -2_--( a2�� ��LL L�� TRANSMITTAL PROACTIVE DIAGNOSTIC SERVICES, INC. To: AOGCC RECEIVED Makana Bender DATA LOGGED 333 W. 7th Ave6 ) �f2J2014 APR Q 6 LUiJ M. .BENDEH Suite 100 Anchorage, Alaska 99501 AOGCC (907) 793-1225 AOGCC RE : Cased Hole/Open Hole/Mechanical Logs and /or Tubing Inspection(Caliper/MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: BP Exploration (Alaska), Inc. Petrotechnical Data Center Attn: Analisa Steger LR2— 1 900 Benson Blvd. Anchorage,AK 99508 gancodc@bp.com and SCANNED APR 2 12016 ProActive Diagnostic Services, Inc. Attn: Diane F. Williams 130 West International Airport Road Suite C Anchorage, AK 99518 Fax: (907) 245-8952 1) Leak Detection - STP 20-Mar-16 P1-04 BL/ CD 50-029-22366-00 2) Signed : m,caasifk..,,i) 6....„„eeet Date : Print Name: PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-8952 E-MAIL: PDSANCHORAGE@MEMORYLOG.COM WEBSITE:WWW.MEMORYLOG.COM D:\Achives\MasterTemplateFiles\Templates\Distribution\TransmittalSheets\BP_Transmit.docx XHVZE . Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. /¢J"' (~U File Number of Well History File PAGES TO DELETE Complete RESCAN [] Color items - Pages: r~ Grayscale, halftones, pictures, graphs, charts- Pages: [] Poor Quality Original- Pages: [] Other- Pages: DIGITAL DATA OVERSIZED Diskettes, No. ~ Other, No/Type · n Logs of various kinds . · [] Other COMMENTS: Scanned by: Dianna Vincent Nathan Lowell TO RE-SCAN Notes' Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: ~si Producers with sustained casing pressuon IA during proration • Page 1 of 1 Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [ AKDCWeIllntegrityCoordinator ©bp.com] Sent: Monday, July 18, 2011 3:53 PM To: Regg, James B (DOA); Maunder, Thomas E (DOA); Schwartz, Guy L (DOA); Cismoski, Doug A; Daniel, Ryan; AK, D &C Well Services Operations Team Lead; AK, D &C Wireline Operations Team Lead; AK, OPS Prod Controllers; AK, OPS GC2 OSM; AK, OPS GC2 Ops Lead; AK, OPS GC2 Wellpad Lead; AK, OPS GC2 Field O &M TL; AK, OPS GC2 OSS; AK, OPS GC1 Wellpad Lead; AK, OPS GC1 OSM; AK, OPS GC1 Field O &M TL; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS FS1 DS Ops Lead; AK, OPS FS1 OSM; AK, OPS FS1 Ops Lead; AK, OPS GPMA Field O &M TL; AK, OPS GPMA OSM; AK, OPS GPMA OSS Cc: Walker, Greg (D &C); Grey, Leighton (CH2M Hill); Reynolds, Charles (ALASKA); Kaminski, Alice; Warner, Ross L; Oakley, Ray (PRA); Greaves, Damien C; Brown, Don L. Subject: Producers with sustained casing pressure on IA during proration All, The following producers were reported to have sustained casing pressure on the IA during the proration and shutdown activity July 15 -18. The immediate action is to perform a TIFL on each of the wells and evaluate for IA repressurization. If any of the wells fail the TIFL, a follow up email will be sent to the AOGCC for each individual well. 05-41A (PTD #2031700) P1 -04 (PTD #1930630) L -104 (PTD #2012380) V -04 (PTD #2061340) V -103 (PTD #2021860) , tti JUL 2*, 04 2 01► W -36 (PTD #1881060) Y -04 (PTD #1791050) Y -16 (PTD #1830490) All the wells listed above will be re- classified as Not Operable until start -up operations are complete and stable or the well passes a pressure test proving integrity. After start -up, the wells will then be reclassified as Under Evaluation with POP parameters to prevent any over - pressure incidents. Please call with any questions or concerns. Thank you, Mehreen Vazir (Alternate: Gerald Murphy) Well Integrity Coordinator BP Alaska Drilling & Wells Well Integrity Office: 907.659.5102 Email: AKDCWeIllntegrityCoordinator @BP.com 7/19/2011 BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 January 1, 2010 _~.~~~ J~-~? ~~ 201 Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPMA P1 Dear Mr. Maunder, ~a3_ ~~ p~-°'t Enclosed please find multiple copies of a spreadsheet with a list of wells from GPMA P1 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, Torin Roschinger BPXA, Well integrity Coordinator BP Exploration (Alaska) Inc. Surtace Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) r Date 8/13/2009 Well Name PTD # API # Initial to of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor! sealant date ft bbls ft na al P1-o1 1900270 50029220160000 NA 0.2 NA 1.70 7/6/2009 P1-02A 2020650 50029217790100 NA 0.1 NA 0.90 7/8/2009 P1-03 1890130 50029219120000 Cemented to flutes NA 0 NA 0.00 P1-04 1930630 50029223660000 NA 0.2 NA 1.70 7/8/2009 P1-05 1930870 50029223780000 NA 0.2 NA 1.70 7!18/2009 P1-O6 1961370 50029226950000 Sealed conductor NA NA NA NA P1-07A 2040370 50029219960100 SC Leak NA NA NA NA P1-08A 2021990 50029223840100 NA 1.2 NA 6.50 7/8/2009 P1-09 1961540 50029227040000 NA 14.5 NA 141.10 7/9/2009 P1-11 1920860 50029222840000 NA 0.2 NA 1.70 7/7/2009 P1-12 1910130 50029221340000 NA 0.6 NA 6.80 7/7/2009 P1-13 1930740 50029223720000 NA 1.5 NA 10.20 7/6/2009 P1-14 1930160 50029223380000 NA 1.5 NA 10.20 7/6/2009 P1-16 1930340 50029223490000 NA 0.7 NA s.so 7/6/2009 P1-17 1930510 50029223580000 NA 1.7 NA 11.90 7/7/2009 P1-18A 2020760 50029229530100 NA 1.8 NA 8.50 7/7/2009 P1-20 1920940 50029222880000 NA 0.6 NA 3.40 9/12/2009 P1-21 1930590 50029223630000 NA 0.6 NA 5.10 7/7/2009 P1-23 1961240 50029226900000 NA 1.6 NA 13.60 7/7/2009 P1-24 1961490 50029227030000 NA 10 NA 107.10 12/13/2009 P1-25 1890410 50029219370000 Sealed conductor NA NA NA NA P1-G1 1921130 50029222980000 NA 0.2 NA 1.70 7/6/2009 07/28/08 ~chlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Wall .Inh it N0.4799 Company: State of Alaska ~~~~ ~~ ~ ~ ~~~$ Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 1 nn rlacrrinfinn fl~fa RI r_nlnr rtt G-29A 12096905 MEM PROD PROFILE 07/18/08 1 P1-04 12017505 PROD PROFILE 07/17/08 1 L-219 11999028 FLUID DENSITY LOG 07/16/08 1 1 L-205 11999021 USIT 06/17b8 1 1 X-16A 11978465 RST 06/03/08 1 1 K-14A 11628804 MCNL 11/15/07 1 1 r~tNSt AGRrvvwLtuGt r+tt;tlr 1 CT ,ICiNINCi ANU lit 1 UFINING UNt GUPY EAGt1 TV: BP Exploration (Alaska) Ind: Petrotechnical Data Center LR2-1 - 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 9 503-28 8 ATTN: Beth j / Received by: /l/ ®-®/ • ~' STATE OF ALASKA ~' ALASKA Oil AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Abandon 0 Alter Casing D Change Approved Program D 2. Operator Repair Well 0 Pluq PerforationsD Pull Tubing 0 Perforate New Pool D Operation Shutdown 0 Perforate ŒJ 4. Current Well Class: Stimulate 0 OtherD WaiverD Time ExtensionO Re-enter Suspended WellO 5. Permit to Drill Number: 193-0630 Name: BP Exploration (Alaska), Inc. 50.40 8. Property Designation: ADL-028297 11. Present Well Condition Summary: Development Œ] Stratigraphic D 9. Well Name and Number: P1-04 10. Field/Pool(s): pt Mcintyre Oil Field I Pt Mcintyre Oil Pool ExploratoryD Service D 6. API Number 50-029-22366-00-00 3. Address: P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): Total Depth measured 11600 feet true vertical 9214.8 feet Plugs (measured) None Effective Depth measured 11514 feet true vertical 9138.6 feet Junk (measured) None Casing Length Size MD TVD Burst Collapse Conductor 70 20" 91.5# H-40 42 112 42.0 112.0 1490 470 Production 10523 7-5/8" 29.7# NT-95HS 37 - 10560 37.0 - 8335.4 8180 5120 Production 1040 7-5/8" 29.7# 13CR80 10560 - 11600 8335.4 - 9214.8 6890 4790 Surface 3941 10-314" 45.5# NT-80 41 - 3982 41.0 - 3552.4 5210 2480 Perforation depth: Measured depth: 11024 -11044,11070 -11090,11120 -11190,11190 -11210,11210 -11230,11250 -11290,11290 -11330 11330 - 11335, 11355 - 11375, 11375 - 11460 True vertical depth: 8713.68 - 8730.47, 8752.36 - 8769.25,8794.71 - 8854.59,8854.59 - 8871.79,8871.79 - 8889.03.8906.33 - 8941.09 8976.04 - 8980.42,8997.97 - 9015.55,9015.55 - 9090.67 Tubing ( size. grade. and measured depth): 4-112" 12.6# 13Cr80 @ 34 10517 Packers & SSSV (type & measured depth): 4-112" Baker SABL-3 Packer 4-112" Camco TRCF-4A SSV @ 10447 @ 2321 RECEIVED 12. Stimulation or cement squeeze summary: Intervals treated (measured): .~ ¡,.. " f) ('II'!, " . .":.4 ,ttlao4,.~ -"h . . ~~~ 1'..16,1 ~! Gas Coos' . !-Y1cho~ c..ommlNt,Q6t' 13 Treatment descriptions including volumes used and final pressure: Representative Daily Average Production or Injection Data Gas-Met Water-Bbl Casing Pressure 1.9 3821 2200 3.3 4135 2050 Qil-Bbl 355 781 Tubing Pressure 1523 1456 Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys run - Daily Report or Well Operations. ! 15. Well Class after proposed work: ExploratoryD 16. Well Status after proposed work: Oil[K Gas D Development ŒJ Service 0 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. WAG D GINJD WINJD WDSPLD Prepared by Garry Catron (907) 564-4657. Sundry Number or N/A ir C.O. Exempt: NIA Contact Printed Name Signature Garry Catron Garry Catron ,)ja1A/f' ~",~N1 Title Production Technical Assistant Phone 564-4657 Date 8/4/04 Form 10-404 Revised 4/2004 'ØliS Bf~ a.e ~tr: ,cfI 1 ~þl~~~ ~ ~ ~V'~~I :1 .~ " II' P1-04 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 03/11/04 --WELL FLOWING ON ARRIVAL-- (REPERF). DRIFT 12' X 2-7/811 DUMMY PERF GUN, TBG END LOC AND SAMPLE BAILER TO 11477' CORR TO ELM - DEEPEST REQUESTED RE-PERF SHOT @ 11375' ELM - DEEPEST OPEN PERFS ARE 11460' ELM (17' OF RA THOLE) OS/22/04 Perforate 11290'-11330' 6 SPF, 11355'-11375' 6 SPF OS/23/04 Perforate 11024'-11044' 6 SPF, 11190'-11210' 6 SPF FLUIDS PUMPED BBLS No Fluids Pumped 0 ITOTAL Page 1 TREE = WELLHEAD = ACTUA. TOR = KB. 8..EV = BF. B... EV = KOP= ~x Angle = Datum fv[) = DatumTVO = Cr.N 011S 50' 1152' 46 @ 6453' 11185' 8800' SS 110-3/4" CSG. 45.5#, NT-80. 10 = 9.953" H 3982' ~ Minimum ID = 3.725" @ 10494' 4-1/2" PARKER SWN NIPPLE 4-112" TBG. 12.6#, NT-13-CR-SO. -1 10516' 1 .0152 bpf.ID = 3.958" PERFORATION SUMrv1A RY RB= LOG: ATLAS DLLlGR ON OS/22/93 ANGLEA TTOP PERF: 41 @ 10290' Note: Refer to A'oduclion DB for histoncal perf data SIZE SPF INfER\! AL Opn/Sqz DA TE 2-7/8" 6 10290 - 10330 0 05/22/04 2-7/8" 6 1(1355 - 10375 0 OS/22/04 2-7/8" 6 11024 - 11044 0 05/23/04 3-3/8" 6 11070 - 11090 0 08/19193 3-3/8" 6 11120 - 11230 0 08/19193 2-7/8" 6 11190- 11210 0 05/23/04 3-3/8" 6 11250-11335 0 08/19/93 3-3/8" 6 11355 - 11460 0 08/19/93 P1-04 (i) L I I I SAFETY NOTES: 2321' H 4-1/2" CAMCO TRCF SSSV. ID = 3.812" 1 ~ ST fv[) 1VD 1 4783 4139 2 8087 6488 3 10314 8146 0 GAS LFT rv1ANORELS DEV lYPE VLV LATCH 44 KBMG S/O BK 42 KBMG DMY BK 40 KBMG DMY BK FORT DATE 20 04/26/03 04/26/03 04/26/03 1 10377' 1-1 BAKER crvu SLIDING SLV, D = 3.812" 1 z Z -----I 10446' 1-1 7-5/8" X 4-1/2" BA KER SABL-3 PKR 1 I f 1 PBm 1-1 11511' 1 ,~ 17-5/8" CSG. 29.7#. NT-13-CR-95,ID =6.875" 1-1 11588' ~ DA TE REV BY COMMENTS 05127/93 ORIGINAL COMPLEfION 07/16/01 RN/KAK CORREC1l0NS 04/11/03 JJ/KAK GLV 00 04/26/03 JM/lP GLV 00 5/22-23/0,( MJA/KAK ADPERFS I DATE REV BY 1 10477' 1-1 4-1/2" PARKERSWS NSCTNIP,ID= 3.813" 1 1 10494' 1-1 1 10516' 1-1 1 10500' 1-1 r: r: COMMENfS 4-1/2" PARKERSWN NSCf NIP, D =3.725" 1 4-1/2" TlJ3ING TAIL WLEG 1 ELMD TT LOGGED 06/12/93 PONT MCNTYRE UNIT WELL: P1-04 PERMT No: 1930630 API No: 50-029-22366-00 SEe 16. T12N. R14E 134.53' FEL & 906.25' FNL BP Exploration (Alaska) MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU: FROM: Julie Heusser, DATE: Commissioner Tom Maunder, ~q~°~SUBJECT P. I. Supervisor ~[~' ~ \ : John H Spaulding, Petroleum Inspector April 10, 2001 SVS Tests BPX PBU LGI & PM-O1 April 11, 2001: i traveled to BPX's Lisbume Gas Injection (LGI) and also on to the Point Mclntyre PM-01 location to witness Safety Valve Testing. The AOGCC SVS test reports are attached for reference. As noted 3 failures were observed on both pads; with 2 being repaired and retested immediately. The third failure asssv and will need further attention. Mark Wysocki, lead operator was training 2 new hires. The crew did an excellent job. Summary: I witnessed the SVS tests on LGI and PM-01 LGI, 3 wells, 9 components, 1 failure, 11% failure rate PM-01, 11 wells, 33 components, 2 failures, 6% failure rate Attachment; Svs bpx Igi 4-10-0 ljs Svs bpx prn-01 4-10-0 ljs Non Con.f, id,en.,ti,.al Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Mark Wysocki AOGCC Rep: John H: Spaulding Submitted By: ,John Spaulding Date: Field/Unit/Pad: ~ Mcln~, e/PBU/PM-01 Separator psi: LPS 460 HPS 4/9/01 i i .i . ' . i i i i iii i i I ii . i ~:S$~: i~[SSSV Well TyPe .. ~, . Weft Pemit Separ Set L~ T~t Test T~t Date Numbyr Number P~I ,,. PSI T~p Code Code Code Passed , G~ ~EC~CLE ~2 ~9~0370 ~-02 i~00~0 g~-o~ .... ~Sb0~3'o 460 '~0 " ~0 p p V' 'oiu ~~-~ i93063'0 '460 "700700 .... P' ' ~'~-0~ "~9~0~50 460~0 ~00P v ~ ..... oI~ P~-06 ~96~70 46o700 67~P P v 0~ g~-07 i~9~3~0 ............ 9~'0~ ' ~9~0980 '460 "'~00~200 "~ ~ '9 ....... oi~ g~-09 ~96~40 4~ ~0 ~00~ P P v oil ~f-~ ~' ~ 920s60460 3~0 2~0 p '~ P v ' 0i~' Pl-12 1910130 P~-i3'~9~0740 "460 .... is~ ~0 V 'P ' V .... 0~ P~-~7 ~9~0~0460 ~0 ~0 p p p oI~ P1-20 19209~0' ~60 " 350 ' 175 3 P '"P ..... 4/9)01 OIL P1-23 "1961240 ................. P1-24 1961490 P~-a~'~92~0~ ~6002906 '~8~6 P v' 'v ' a~j Wells: 11 Components: 22 Failures: 2 Failure Rate: 9.0I}% I"190 var Remarks: P 1-08 & P 1-3 were choked. ~ck,. hence t.he. higher pilot, settings ...... P::- ....... ~ 1L20 pilot re. set and..retested .................... RJF 1/16/01 Page 1 ofl 010409-SVS PM-01 PBU-js Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: ,, ,M, ,ark ',~'socl.~ AOOCC Rep: Jo .h3a' .,H,. spa,U!d',m,g Submitted By. .John Sp,auld'.mg Field/Unit/Pad: Lisburne/PBU/LGI Separator psi:~ LI~s ............. Date: 4/9/01 ~S Well Permit Separ Set LfP Test Test Test Date Oil, WAG, GIN& Number Number PSI PSI Trip Code Code Code Passed GAS or CYCLE LGI-02 1861400 3800 2900 2300 ~ P' P 4/9/01 G1NJ LGI-0n 1880130 LGI-0,6 1860670 3800 2900 2500 P P P GINJ LGI-08 1860550 ........ LGI-10 1860690 3800 2600 2300 , P P P' GINJ LGI-12 1860540 , , , , , , , , , . ,, ,, Wells: ~_ :. 3 Components: _. ,., 6.,_ Failures: 1 Failure Rate: 16.67oA[~] 90 Day Remarks: ~LGI-02 Pilot._ tripped to low and was reset-retested and passed RJF 1/16/01 Page 1 of 1 010409-SVS LGI Lisburne-js ON OR BEFORE 93 .... 06,'.3 93 083 93 '-'-063 93-'063 93 -06S 93 -'083 83---O63 93 ~' 0 6 3 93 -'- 063 {}3 063 93 --063 g 3 --063 93.,.06~ 9,~ '~ ..... 083 93-,083 93'- 06 ?.. 93---063 ,&F'e cJF'y Y./a s !: h e Ar'.e we-il C 0 H H E i',.! T S G e <::::, 'J c,,..Tj ? c ,!.z.: l H a t e r' 'i ,3 'i s I n v ,s n !: ,. ~ r" ',:,.. O A'ir' A "'F C, A'T ,a ....... F' !. U rE: !57 a. 6 4.07 · ~'" Y 0 F' D ,~ ,l, i..W E L L SURVEY S U R V E Y 8 L.I R V E Y S U ~ V E Y Bt'IF' ,SB'T' ~,x ,IWL...~ CE T C O H F' DL.L ,3R/S F; ,3 C ¥ Z~:,L/CN L/a F,'. 'i'- S U R V E Y · '- i 1533 0 H / D !iL';, I DATE; 08/i 9/93 2 7 / 9 3 i/93 05/ . D!REC'F~ONAL ZNTERPOLATION DXRECTXONAI,. :~ lOaSO ..... i i446 1.0'70 .... J 1!4.60 ~2&51:~8~a-O''''i 1560 2Ei ::~83~0'' '1 i580 2&5" ~ 8340"' i i 560 INAL H~/D ~.)8/23.,' i993 JO./'J 'J ./' 'l g !)3 JO/"l I/"'j993 (3 o t ....' 'l .9.93 . ~., 2J/, 1Il)/ i 1/''i993 i()/"i i,/'Jgg?, I i / 'J 9./" 'i r:~...':9 ,.~ 0 (~//' 23 ,,'" 'J 993 0.. 8 ,/ ,...° :) / I 9 g 3 () ?, / 2 ~),/ '1 g 93 '1 i/ i9/ I993 [18//23/ i 993 . o/'~:.:~/'i 993 0 [':',/23/' '1 E~ 9 '.'~ 08/' 23 / i 993 i i,/ i9/1993 .......... /' i 9 ...... , ~:n complS'ance I n 5 't ~' a 1 J'l C) Transmittal ¢359 (AOGCC) Page 2 P1-04 iPl-05 Pl-O5 P1-05 [Pl.-08 [Pl-13 ~P1-13 IPl_17 P2-O6 ?2-06 P2--06 Log Well Title Run # Run Date Company 1blue line P1-21 Integrated Formation Log ~ 4/30--5/5/93 Ex. log ~Tr_O- It ~%5'~ P1-21 Integrated Formation Log ~~" '- 4/3¢5/5/93 Exlog C-,sc>o- P1-21 Engineering Parameters ~ - 4/30-5/5/93 Exlog 2"~ e~--- P1-21 Pressure Data Log -MD"'" - 4/30-5/5/93 Exlog ~' ~¢co -- ? P2-06 Z-Densilog/Cmpnstd NEUTRON/GR/Caliper ~'~ ~-S"~ l~oo - 8/17/93 Atlas P2-06 Dual Laterolog/Gamma Ray/SP ' 1 8/17/93 Atlas 0,~5" P2-06 Sub-Sea Vertical Depth (Single Shot Data)-.N1 8/17/93 Atlas P2-06 Borehole Profile 1 8/17/93 Atlas ~5 ;~-l" % tq0o- P2-16 Z-Densilog/Cmpnstd NEUTRON / GR/ Cahper /? m~'°' P2-16 Dual Induction Focused Log/Gamma Ray 1 9/13/93 Atlas P2-16 Sub-Sea Vertical Depth (Multi Shot Data) 1 9/13/93 Atlas P2-16 Borehole Profile I 9/13/93 Atlas P2-46 Z-Oensilog/Cmpnsta NEUTRON/OR/Caliper ¢~'~i' '~t°972779~32"::1~5' Atlas P2-46 Dual Induction Focused Log/Gamma Ray 1 9/27/93 Atlas P2-46 Sub-Sea Vertical Depth (Directional Drlg Data) ~ 1 9/27/93 Atlas P2-46 Borehole Profile 1 9/27/93 Atlas ~>1+2"~ ~-~o-~.~ : Diskette/Tape (w/verificaHon listing) Well Title Run # Run Date Company GCT diskette-Complete Calc. v' I 7/28/93 Schlumberger GCT diskette-Complete Calc.v" 1 8/_12/.9_3 Schlumberger CDN/CDR MAD Data in 1 Bit Run (O_H Edit)~2/~l kk37~0~/~Schlumberger CDN/CDR in 3 Bit Runs (O__~H Edi0v' - CDR/GR'O~y ~ 5 Bit R~ (OH E~t)~613/~W'~° Du~ ~op Resis/DemiW/Neu~on/GR w/~s~g 5-7 F~ ~ w/Lis~ + ~ - F~ ~ w/LisHng~~ - Fin~ ~ w/~s~~ - F~ ~D w/Lis~g ~ ~ / - CDN/CDR m 3 Bit R~s (O~ E~t)~% DLL/~/ZDL/GR ~ LDWG Fomat w/~s~g 6/27/93 7/13/93 7/24/93 6/6/93 6/07/93 4/16/93 4/16/93 8/17/93 8/17/93 8/17/93 Schlumberger Schlumberger Schlumberger Baker Hughes Baker Hughes Baker Hughes Baker Hughes Baker Hughes Schlumberger Atlas PLEASE SIGN ONE COPY AND RETURN Transmittal #361 (AOGCC) ., Page 2 Log Well Title 1 sepia P1-21 -./Integrated Formation Log-MD P1-21 V' ~Integrated Formation Log-TVD P1-21 VEngineering Parameters -MD P1-21 ./Pressure Data Log-MD P2-06 v/Z-Densilog/Cmpnstd NEUTRON/GR/Catiper 1 P2-06 ,/'Dual Laterolog/Gamma Ray/SP 1 P2-06 ,/Sub-Sea Vertical Depth (Single Shot Data) 1 P2-06 v/t3orehole Profile I P2-16 P2-16 P2-16 P2-t6 '/Z-Densilog/Cmpnstd NEUTRON/GR/Ca~per 1 v?/~ual Induction Focused Log/Gamma Ray 1 ub-Sea Vertical Depth (Multi Shot Data) 1 ,/Borehole Profile 1 P2-46 P2-46 P2-46 P2-46 7'Z-Densilog/Cmpnstd NEUTRON/GR/Caliper 1 v/Dual Induction Focused Log/Gamma Ray 1 ,/Sub-Sea Vertical Depth (Directional Drlg Data) 1 d'Borehole Profile I Run # Run Date - 4/30-5/5/93 - 4/30-5/5/93 - 4/30-5/5/93 - 4/30-5/5/93 8/17/93 8/17/93 8/17/93 8/17/93 9/13/93 9/13/93 9/13/93 9/13/93 9/27/93 9/27/93 9/27/93 9/27/93 Company Exlog Exlog Exlog Exlog Arias Arias Atlas Arias Atlas Atlas Atlas Atlas Atlas Atlas Arias Atlas Please and return to: Laura S. Lahrson, ATO-409 ARCO Alaska, Inc. 'P.O. BOX 100360 Anchorage, Alaska 99510-0360 Transmittal #361 RECEIVED NOV ~ 9 1993 ~aska Oil & Oas Cons. Commission Anchorage PLEASE SIGN ONE COPY AND RETURN Date: Subject: Fr om: ARCO Alaska, Inc. _.sburne/Point McIntyre Engineering November 17, 1993 Transmittal #361 ARCO Alaska Inc. To: Bob Crandall AOC4ZC 3001 Porcupine Drive Anchorage, AK 99501 Enclosed are sepias for the following Point McIntyre logs. These sepias were erroneously omitted from Transmittal #359, sent 10/13/93. This information is confidential and your cooperation in maintaining confidentiality is appreciated. Log Well Title Run # Run Date Company 1 sepia ' P1-04 Completion Record, Perforation HSD 6 sfp 33/8" I 8/19/93 Schlumberger I F1-05 v/Perforating Record 3%$" HSD 41B HJ II RDX 1 8/23/93 Schlumberger P1-05 ~/Per£orating Record 33/0'' HSD 4lB HJ II RDX 1 8/30/93. Schlumberger P1-05 v'Perforating.Record 3%8"HSD 4lB HI II RDX 1 8/31/93 Schlumberger 1-05 vPerforating Record 33/8'' HSD 4lB HJ II RDX 1 9/01/93 Schlumberger 1-05 v, Perforating Record 33/8'' HSD 4lB HJ II RDX 1 9/02/93 Schlumberger · .. P1-08 ,./int~ated Formation Log-MD - 7/19-24/93 Exlog P1-08 v4ntegrated Formation Log-TVD - 7/19-24/93 Exlog P1-08 ,/Engineering Parameters-MD - 7/19-24/93 Exlog P1-08 ,,'Pressure Data Log-MD - 7/19-24/93 Exlog ',/P1-08STI' Integrated Formation Log -MD v'Plq38ST1 Integrated Formation Log-TVD v'PI-GSST1 Engineering Parameters -MD v'I'4-GSST1 Pressure Data Log-MD · - 7125-31193 Exlog - 7125-31/93 Exlog - 7125-31/93 Exlog - 7125-31/93 Exlog Pl-13 ,/'Integrated Formation Log-MD Pl-13 V' Integrated Formation Log-TVD P1-13 ,/Engineering Parameters -MD Pl-13 v'pressure Data Log-MD' - 6/1-11/93 Exlog - 6/1-11/93 Exlog - 6/1-11/93 Exlog - 6/1-11/93 Exlog Pl-17 v/Integrated Formation Log-MD' Pl-17 v/Integrated Formation Log-TVD P1-17 V' Engineering Parameters -MD P1-17 v/Pressure Data Log-MD - 4/12-16/93 Exlog - 4/12-16/93 Exlog - 4/12-16/93 Exlog - 4/12-16/93 Exlog PLEASE SIGN ONE COPY AND RETURN Date: Subject: From' October 13, 1993 Transmittal #359 ARCO Alaska Inc. ARCO Alaska, Inc. Lisburne/Point McIntyre En~. ,eering To' Bob Crandall AOC4ZC 3001 Porcupine Drive Anchorage, AK 99501 The following Point McIntyre data are enclosed. This information is confidential and your cooperation in maintaining confidentiality is appreciated. Log Well Title P1-04 Completion Recora, Perforation HSD 6 sfp 3 Pt-05 Perforating Record 3%" HSD 4lB HJ P1-05 Perforating Record 3%" HSD 41B HJ P1-05 Perforating Record 3%" HSD 41B HI 17 RDX- P1-05 Perforating .Record 3%".HSD P1-05 Perforating Record 3%8" HSD 41B HJ r[ RDX P1-08 Integrated Formation L'og P1-08 Integrated Formation Log..._~-D C0~%z.-~?TZ', :z" - P1-08 Engineering Parameters -~ 2."; b'~co-lOo~'o' - P1-08 Pressure Data Log-MD I") ~ - g? ~' - Run # 'Run Date Company 1 8/19/93 Schlumberger. t~ z~w-z~ 8/23/93 Schlumberger 1 ~ ',~ 8/30/93 Schlumberger le6,~',-~8/31/93 Schlumberger lm~¢ ,,~9/01/93 Schlumberger I 4---'"' 9/02/93 Schlumberger 7/1%24/93 7/1%24/93 7/t9-24/93 7/19-24/93 Exlog Exlog Exlog Integrated Formation Log 4g~-2'~, eq-lo-to~' - Integrated Formation Log ~)~"~ ~uO--%?(.o/ Engineering Parameters ~ ~"~ ~ 70-- l~co' Pressure DataLog-MD 1% ~lz~-'~7~' - 7/25-31/93 7/25-31/93 7/25-31/93 7/25-31/93 Ex3og Exlog Exlog Exlog P1-13 P1-13 P1-13 ~P1-13 Integrated Formation Log Integrated Formation Log Engineering Parameters Pressure Data Log -MD 6/1-11/93 6/1-11/93 6/1-11/93 6/1-11/93 Exlog Erdog Exlog Exlog I Pl-17 JPI-17 q¢9/6\ /P1-17 IP1-17 nLo 2" 7800 Integrated Formatio g ~ ;, Integrated Formation Log-W_Z).2~ 7~co- Engineering Parameters ~ 2", 7~:o-- Pressure Data Log-MD I"~ ob-vo- ~Z~c> 4/12-16/93 4/12-16/93 4/12-16/93 4/12-16/93 Exlog Ex. log Exlog Exlog PLEASE SIGN ONE COPY AND RETURN Transmittal #361 (AC)GCC) Page 2 Log Well TiQe 1 sepia P1-21 ~/Integrated Formation Log-MD P1-21 V' Integrated Formation Log-TVD P1-21 fEngineering Parameters-MD P1-21 dPressure Data Log-MD P2-06 V'Z-Densilog/Cmpnstd NEUTRON/GR/Caliper 1 P2-06 v/Dual Laterolog/Gamma Ray/SP 1 P2-06 ,/Sub-Sea Vertical Depth (Single Shot Data) 1 P2-06 ~/Borehole Profile 1 P2-16 v/Z-Densilog/Cmpnstd NEUTRON/GR/Caliper 1 P2-16 v"Dual Induction Focused Log/Gamma Ray 1 P2-16 x/Sub-Sea Vertical Depth (Multi Shot Data) 1 P2-16 ,/Borehole Profile 1 P2-46 P2-46 P2-46 P2-46 ,/Z-Densilog/Cmpnstd NEUTRON/GR/Caliper 1 v/Dual Induction Focused Log/Gamma Ray 1 ~/Sub-Sea Vertical Depth (Directional Drlg Data) 1 ,/Borehole Profile 1 Run # Run Date - 4/30-5/5/93 - 4/30-5/5/93 - 4/30-5/5/93 - 4/30-5/5/93 8/17/93 8/17/93 8/17/93 8/17/93 9/13/93 9/13/93 9/13/93 9/13/93 9/27/93 9/27/93 9/27/93 9/27/93 Company Exlog Exlog Exlog Exlog Atlas Atlas Atlas Atlas Atlas Atlas Atlas Atlas Atlas Atlas Atlas Atlas Please and return to: Laura S. Lahrson, ATO-409 ARCO Alaska, Inc. P.O. BOX 100360 Anchorage, Alaska 99510-0360 Transmittal 4/361 RECEIVED NOV 19 1995 · aska oil & Gas Cons. Commission Anchorage PLEASE SIGN ONE COPY AND RETURN Transm~al #359 (AOGCC) Page 3 Report Well P1-04 P1-05 P1-08 P1-13 Pl-17 P1-21 Title Sub-Surface Directional Survey (2 copies)v/ Sub-Surface Directional Survey (2 copies)v/ Final Well Report ~/ Final Well Report ~" Final Well Report~" Final Well Reportw Date 7/28/93 $/12/93 7/19-8/1193 6/1-11/93 4/12-16/93 4/30-5/5/93 Company Schlumberger Schlumberger Exlog Exlog Exlog Exlog Please and return to: Laura S. Lahrson, ATO-409 ARCO Alaska, Inc. P.O. BOX 100360 ' Anchorage, Alaska 99510-0360 Please note: The Exlog blueline logs are located within the Final Well Report binders. Transmittal #359 PLEASE SIGN ONE COPY AND RETURN INDIVIDUAL WELL GEOLOGICAL INVENTORY REPORT PERMIT DATA DETAIL 93-063 SURVEY 93-063 BHP 93-063 CBT & JWL 93-063 CET 93-063 DLL,GR/SP 93-063 GCT 93-063 SSTVD 93-063 ZDL/CNL/GR 93-063 407 93-063 DAILY WELL OP 93-063 SURVEY 93-063 SURVEY 93-063 SURVEY 93-063 5746 FINAL MWD R1,5",8340-11560 R1,5"~10480-11446 R1,5",10480-11484 RI,2&5",8340-11560 R1,35-11451 R1,2&l",8340-11560 RI,2&5",8340-11560 COMP DATE:08/19/93 05/11/93-05/27/93 MWD NO INTERPOLATION SS DIRECTIONAL OH-DLL,8285-11533 SUMMARY Are well tests required? Yes No Was well cored? Yes No If yes, was the core analysis & description received? Are dry ditch samples required? Yes No WELL IS IN COMPLIANCE. INITIAL 10/14/1993 PAGE · 1 Yes No COMMENTS: STATE OF ALASKA ALASKA uiL AND GAS CONSERVATION CO~v]MISSION WELL COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska,/nc. 93-63 3. Address B. APl Number ~,,'"'__ P. O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-22366 4. Location of well at surface 9. Unit or Lease Name 1463'NSL, 681' WEL, SEC. 16, T12N, R14E ;:-¥: ~ ........ Point Mclntyre ~ .......... :~,~ i 10. Well Number 1059' SNL, 390 WEL, SEC. 15, T12N, R14E - ~-~_'.~'/~_~ ;. At Total Depth ~ ~'~"'" ; i 'Point Mclntyre I !5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE =50.4' I ADL 28297 12. Date Spudded 113. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions 5/11/93 5/23/93 8/19/93I N/A feet MSL J One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVDI 19. Directional Survey 120. Depth where SSSV set ~21. Thickness of Permafrost 11600' MD/9215' TVD 11514' MD/9139' TVD YES [] NO []I 2321' feet MD ~ 1750' (Approx.) 22. Type Electric or Other Logs Run G R/C D L/ZD L/D L L/TE MP/ C H T 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surface Surface 26" 362 sx Arcticset 10-3/4" 45.5/t NT-80 41' 3982' 13-1/2" 12OO sx "G"/350 sx "G"/~25 sx"C" 7-5/8" 29. 7# N T95HS 3 7' 10560' 9- 7/8" 7-5/8" 29. 7# 13CR 10560' 11588' 9-7/8" 612 sx "G" 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD} Gun DiameterMD 3-3/8" T~pf 4-1/2", 13CR 10517' 1044 7' 11070; 11090' 8753;8770' 11120; 11230' 8795'-8890' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 11250'-11335' 8907'-8981' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 11355'- 11460' 8999 ;9113' 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) Not.yet on production I N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESlZE IGAS-OIL RATIO TEST PERIOD ~ I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE I~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. RECEIVED 0 OT 1 1 199~3 ,qlaska 0il & Gas Cons. C0mmissi0~ Anchorage Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MARKERS , ...,RMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, ME. AS. DEPTH TRUE VERT. DEPTH GaR, and time of each phase. Subsea K-lO 10613' 8319' HRZ 10856' 8516' Kuparuk 10982' 8620' Miluveach 11519' 9085' OOT 1 1 199 Alaska Oil & Gas Cons. C'omrnission Anchorago 31. LIST OF A'I-rACHMENTS 32. I hereby cedify that the foregoing is true and correct to the best of my knowledge Signed ¢' Title Drill~rTe EngfiToorSuporvisot' Date ((,j /'((,'"~ 7 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24 : If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: P1-04 BOROUGH: NORTH SLOPE UNIT: POINT MCINTYRE FIELD: POINT MCINTYRE LEASE: APl: 50- PERMIT: APPROVAL: ACCEPT: 05/10/93 05:00 SPUD: 05/11/93 05:00 RELEASE: OPERATION: DRLG RIG: POOL 7 WO/C RIG: POOL 7 05/11/93 (1) DRLG. MW: 8.5 VIS: 0 TD: 115'(115) MOVE RIG. RIG ACCEPTED @ 17:00 HRS, 5/10/93. N/U DIVERTER. MIX SPUD MUD. TEST DIVERTER. M/U BHA. SPUD WELL @ 05:00 HRS, 5/11/93. DRLG. 05/12/93 ( 2) SHORTTRIP. MW: 9.1 VIS:210 TD: 1821'(1706) DRLG F/120'-1821'. CIRC. SHORT TRIP. 05/13/93 (3) POOH. MW: 9.4 VIS: 79 TD: 4000'(2179) SHORT TRIP TO 1819'. DRLG F/1819'-4000'. CIRC. SHORT TRIP TO BHA. CIRC. POOH. 05/14/93 (4) TD: 4000'(0) TESTING BOP'S MW: 9.5 VIS: 64 FINISH POOH. LD MOTOR AND MWD. RU CASING TOOLS. SAFETY MEETING. RUN 10 3/4 45.5# NT80LHE NSCC CASING. CIRC AND CONDITION MUD. PUMP 75 BBL WATER SPACER. DROP BO'FI-OM PLUG. DISPLACE WITH MUD AND BUMP PLUG TO 2000 PSI. FLOATS HELD. RD CASING EQUIPMENT. LD LANDING JOINT. ND DIVERTER. PERFORM 125 SXS PERMAFROST C CEMENT TOP JOB W/ 80' 3/4 PIPE. MU 11" BP SLIMHOLE SPLIT SPEED HEAD. NU 13 5/8" BOPE. TEST BOPE. 05/15/93 ( TD: 5350'( 5) DRLG @ 5350' MW: 9.2 VIS: 55 1350) TEST BOPE. TEST 10 3/4" CASING/WELLHEAD. PU BHA FOR 9 7/8. LUBRICATE AND CLEAN RIG FLOOR. FUNCTION MWD TOOL. TIH TAG 3896'. DRILL PLUGS, FC, CEMENT, FS, AND 10' NEW HOLE TO 4010'. CIRC HOLE CLEAN. PERFORM L.O.T.. DISPLACE KCL MUD. DRILL 4010 TO 5000. CIRC LOW/HIGH SWEEPS. SHORT TRIP TO SHOE. DRILL 5000 TO 5350'. 05/16/93 (6) POOH MW: 9.4 VIS: 48 TD: 7082'(1732) DRILL 5350 - 6024. CIR SWEEP. SHORT TRIP TO 10 3/4" CASING SHOE. SERVICE RIG. C/O TOP DRIVE DIES. TIH. DRILL 6024 - 7082. ROP SLOWED DOWN. CIRC BO'I-I'OMS UP. POOH. 05/17/93 ( 7) DRILLING @ 8300' MW: 9.5 VIS: 47 TD:8300'(1218) POOH. SLIP & CUT DRILL LINE. POOH. CHANGE OUT BIT AND STABILIZER. TIH. WASH AND LIGHT REAMING 6300 - 7082'. DUE TO TIGHT HOLE. DRILL 7082 - 8300'. Aiaska 0ii & Gas Cons. Cornrnissio~ Anchorage WELL :P1-04 OPERATION: RIG : POOL 7 PAGE: 2 05/18/93 ( 8) DRILLING @ 8825' MW: 9.7 VIS: 48 TD: 8825'( 525) DRILL 8300 - 8732. CIRC SWEEP. POOH. SERVICE WEAR BUSHING. CHANGE BIT AND STABILIZER. TIH. REAM LAST STAND TO BOTTOM. ESTABLISH PDC PATTER. DRILL 8732 - 8825. 05/19/93 (9) DRILLING MW: 9.8 VIS: 49 TD:10060'(1235) DRILL F/8825' - 10075'. 05/20/93 ( 1 TD:10736'( 0) POOH FOR BHA MW:10.0 VIS: 52 676) CRILL F/10060 - 10446'. CIRC. SHORT TRIP 17 STDS. DRILL F/10046 - 10736. NOT ABLE TO SLIDE OR TO DROP ANGLE FAST ENOUGH. CIRC HOLE CLEAN. PUMP DRY JOB, POOH. 05/21/93 ( 1 TD:10955'( 1 ) DRILLING MW:10.0 VIS: 60 219) POOH, HOLE GOOD TO 8450'. C/O MUD MOTOR & BIT, ORIENT MOTOR W/MUD. SERVICE WEAR BUSHING. RIH TO SHOE, CK MWD, FILL PIPE. CUT DRILLING LINE, SET BRAKES, SERVICE RIG. RIH, SMALL TIGHT SPOT. DRILL F/10736 - 10955'. CBU, JUST ABOVE THE TOP OF THE KUPARUK, CIRC AND CONDITION MUD, EVEN OUT MUD WT & CLEAR HOLE BEFORE DRILLING AHEAD. 05/22/93 (12) POOH MW:I 0.0 VIS: 48 TD:11590'(635) DRILL F/10955-10990. LOST PRESS, CK SURFACE EQUIP FOR WASHOUT. POOH WET, FOUND WASHOUT IN DRILL STRING 8 STANDS OUT. DRILL F/10990-11590. CIRC AND COND THE MUD. SHORT TRIP 12 STDS, ROTATE AND BACK REAM ALL 12. CBU. 05/23/93 (13) CIRC & COND MUD MW:10.2 VIS: 80 TD:11600'( 10) CIRC & COND MUD. POOH, HOLE IN GOOD SHAPE. CLEAR FLOOR, R/U ATLAS W/L. SERVICE WEAR BUSHING. M/U BHA, RIH. FILL PIPE & REAM 30' TO BO'Ii'OM. DRILL 11590-11600. CIRC AND CONDITION MUD. O5/24/93 ( 1 TD:I 1600'( 4) RUN 7 5/8" CSG MW:10.2 VIS: 66 0) CIRC AND CONDITION MUD. SHORT TRIP 10 STDS. CIRC AND CONDITION MUDDD, SPOT WEIGHTED PILL ON BTM. PULL 15 STDS WETT, HOLE LOOKED GOOD. CHANGE RAMS TO 7 5/8. RIG UP TO RUN 7 5/8" CASINGG. HOLD SAFETY MEETING. RIH W/CSG, CIRC @ SURFACE CSG SHOE. 05/25/93 (15) W/L GR/JB. MW: 8.5 Seawater TD:11600 RIH W/7-5/8" CSG. CIRC. PUMP 20 BBLS PREFLUSH, 50 BBLS PB:11514 SPACER, 130 BBLS CMT. DISP W/SEAWATER. BUMP PLUG W/3000 PSI. N/D BOPE. SET EMERGENCY SLIPS. CUT CSG. SET & TEST PACKOFF. NAJ BOPE. R/U ATLAS. RIH W/~R/JB TO PBTD @ 11514' (WLM). OCT Anchorage WELL 'P1-04 OPERATION: RIG · POOL 7 PAGE: 3 O5/26/93 (16) TD:11600 PB:11514 N/D BOPE. MW: 8.5 Seawater POOH W/GR/JB. FUD ATLAS. RIH W/4-1/2" COMP ASS'Y. LAND TBG. N/D BOPE. 05/27/93 (17) RIG RELEASED. MW: 8.5 Seawater TD:11600 N/U TREE. TEST TREE. DISP TBG W/85 BBLS DIESEL. DROP PB:11514 DART. SET PKR W/4000 PSI. TEST PKR. OK. TESTTBG, ANNULUS. OK. F/P ANNULUS W/90 BBLS 50/50. SET BPV. RIG RELEASED @ 17:30 HRS, 5/26/93. SIGNATURE: (drilling superintendent) DATE: 0T t 'l & Gas Cons. Cornmissio~, Anchorage SUB - SURFA CE DIRECTIONAL SURVEY Company ARCO ALASKA, THC. Well Nam~ P1-04 (1463' FSL, 683' FEL, SEC 16, T12N, R14E) Field/Location POTNT NCINTYRE, NORTH SLOPE, ALASKA Job Reference No. 93345 LoclQed By: FORMICA Date Computed By: I'1 SCHLUMBERGER GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR ARCO ALASKA, INC. P1-04 POINT MCINTYRE NORTH SLOPE, ALASKA SURVEY DATE: 28-JUL-1993 ENGINEER- JEFF FORMICA METHODS OF COMPUTATION TOOL LOCATION- MINIk~J~ CURVATURE INTERPOLATION- LINEAR VERTICAL SECTION- HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF NORTH 63 DEG 29 MIN EAST ARCO ALASKA, INC. P1-04 POINT MCINTYRE NORTH SLOPE, ALASKA TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEQ MIN DEG MIN 0 O0 100 O0 200 O0 300 400 50O 600 700 800 900 0 O0 100 O0 200 O0 COMPUTATION DATE: 30-AUG-g3 PAGE 1 DATE OF SURVEY: 28-JUL-lgg3 KFI:I Y BUSHING ELEVATION: 50.00 FT ENGINEER: JEFF FORMICA INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH 0 O' N 0 0 E 0 13' S I 32W 0 23 S 12 29 E O0 300 O0 400 O0 499 O0 599 O0 699 O0 799 O0 899 -50 O0 50 O0 150 O0 O0 0 18 O0 0 20 99 0 24 99 0 40 95 2 27 81 3 31 57 4 20 O0 250 O0 350 99 449 99 549 95 649 81 749 57 849 FEET DEG/IO0 FEET " FEET FEET DEG MIN 0. O0 -0.07 -0.25 S 6 7 W ' -0.46 S 3 26 W -0 77 S 53 2 E -0 78 S 88 10 E -0 13 N 60 27 E 2 31 N 64 37 E 7 70 N 65 10 E 14 58 O. O0 0 O0 0 40 0 O0 0 15 0 29 0 64 2 O2 0 · 84 O. 87 0 O0 N 0 20 S 0 68 S 1 225 1 75 S 2 27 S 2 505 1 59 S 0 89 N 3 82 N 0.00 E 0 02 E 0 06 E 0 10 E 0 02 E 0 26 E I 10 E 337 E 8 15 E 14 38 E 0 O0 N 0 0 E 0 0 1 1 2 2 3 8 14 2O S 4 33 E 69 S 5 24 E 23 S 4 36 E 75 S 0 32 E 28 S 6 35 E 74 S 23 45 E 73 S 64 47 E 20 N 83 45 E 88 N 75 7 E 1000 O0 1100 1200 1300 1400 1500 1600 1700 1800 1900 ggg 20 O0 1098 O0 1196 O0 1294 O0 1391 O0 1487 O0 1582 O0 1677 O0 1771 O0 1864 949 2O 47 1048 99 1146 71 1244 66 1341 59 1437 84 1532 51 1627 5 36 N 65 48 E 47 8 23 N 63 32 E 99 11 20 N 60 24 E 71 13 5 N 59 8 E 66 15 21 N 60 2 E 59 17 15 N 61 20 E 84 18 7 N 62 47 E 51 19 39 N 65 7 E N 65 31E N 64 2 E 20 1721.20 20 55 53 1814.53 21 25 23 19 35 08 52 lg 73 34 97 75 125 93 156 38 188 59 223 50 259.40 1 56 3 69 2 46 2 18 2 35 1 31 0 95 2 10 0 41 2 32 7 4O N 12 20 31 43 57 71 85 100 115 47 N 32 52 N 48 30 N 66 72 N 87 51N 112 81N 138 gl N 167 43 N lgg 67 N 232 22 22 E 98 E og E 52 35 E 73 43 E 97 O3 E 125 93 E 156 go E 188 67 E 223 18 E 259 23.42 N 71 34 E 35 26 N 69 17 E 28 N 66 54 E 36 N 64 45 E 75 N 63 26 E 93 N 62 50 E 39 N 62 40 E 60 N 62 54 E 50 N 63 18 E 40 N 63 31E 2000 O0 1956 37 1906.37 25 4 2100 2200 2300 2400 2500 2600 2700 2800 2900 O0 2046 35 1996.35 26 35 O0 2135 28 2085.28 27 46 O0 2223 33 2173.33 28 55 O0 2310 31 2260.31 30 13 O0 2396 30 2346.30 31 12 O0 2481 32 2431.32 32 19 O0 2565.39 2515.39 33 15 O0 2648.34 2598.34 34 39 O0 2730.12 2680.12 35 30 3000.00 2811.16 2761 16 36 25 3100.00 2890.53 2840 53 38 15 3200.00 2968.28 2918 28 39 49 3300.00 3044.16 2994 3400.00 3118.92 3068 3500.00 3192.88 3142 3600.00 3267.60 3217 3700.00 3342.67 3292 3800.00 3417.95 3367 3900.00 3492.28 3442.28 42 48 16 41 13 92 42 3 88 42 8 60 41 25 67 41 14 95 41 19 N 62 39 E N 63 52 E N 65 19 E N 66 31 E N 64 47 E N 64 31 E N 65 33 E N 65 56 E N 63 56 E N 63 1 E 298 91 342 54 388 26 435 61 484 89 535 93 588 56 642 66 698 47 756 O2 N 62 56 E 814.61 N 62 47 E 875.42 N 64 9 E 938.3O N 64 49 E 1003 42 N 64 50 E 1069 81 N 64 47 E 1137 10 N 63 51 E 1203 55 N 64 6 E 1269 61 N 64 27 E 1335 42 N 63 21 E 1402 32 2 19 1 64 1 11 0 85 2 O4 1 32 1 20 1 09 1 75 0 58 I 97 1 21 2 38 1 O1 1 29 2 10 0 17 0 40 0 74 1 34 133 61 N 267 39 E 298 91 N 63 27 E 153 172 192 212 234 256 278 3O2 328 27 N 306 86 N 347 18 N 390 26 N 435 34 N 482 55 N 529 69 N 579 26 N 629 13 N 681 33 E 342 66 E 388 93 E 435 99 E 484 02 E 535 75 E 588 16 E 642 78 E 698 lg E 756 54 N 63 25 E 26 N 63 34 E 62 N 63 49 E 91 N 64 2 E 96 N 64 4 E 6O N 64 10 E 73 N 64 18 E 56 N 64 22 E 10 N 64 17 E 354 73 N 733 39 E 814 67 N 64 11 E 382 54 N 787 410 75 N 843 438 54 N 902 466 94 N 962 495 34 N 1023 524.34 N 1083 553.35 N 1142 581.87 N 1202 611.18 N 1262 47 E 875 67 E 938 58 E 1003 60 E 1069 63 E 1137 42 E 1203 78 E 1269 10 E 1335 23 E 1402 47 N 64 5 E 35 N 64 2 E 47 N 64 5 E 88 N 64 7 E 18 N 64 11E 64 N 64 10 E 70 N 64 10 E 52 N 64 10 E 42 N 64 10 E ARCO ALASKA, INC. P1-04 POINT MCINTYRE NORTH SLOPE, ALASKA COMPUTATION DATE: 30-AUG-g3 PAGE 2 DATE OF sg~vg: 28-JUL-lgg3 KELLY BUSHING ELEVATION: 50.00 ET ENGINEER: JEFF FORMICA' INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA .COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 4000 O0 3565 61 3515 61 42 23 4100 4200 4300 4400 4500 4600 4700 4800 4900 oo 3639 oo 3713 O0 3786 O0 3858 O0 3931 oo 4005 O0 4078 O0 4151 O0 4223 56 3589 28 3663 17 3736 69 3808 56 3881 03 3955 63 4028 51 4101 35 4173 56 42 20 28 42,48 17 43 30 69 43 28 56 42 56 03 42 35 63 42 41 51 43 49 35 44 14 N 63 2 E 1470.30 N 63 25 E 1537 61 N 64 3 E 1605 N 64 27 E 1673 N 64 33 E 1742 N 64 31E 1810 N 64 23 E 1878 N 64 16 E 1946 N 63 22 E 2014 N 62 58 E 2O84 18 63 48 95 78 47 93 50 1 42 0 65 1 03 0 41 0 O1 0 56 0 19 0 61 1 13 0 48 641.86 N 1322 91 E 1470 40 N 64 7 E 672.28 N 1382 702.16 N 1443 731.82 N 1505 761.44 N 1567 790.88 N 1629 820.14 N 1690 849.47 N 1751 879.54 N 1812 910.98 N 1875 95 E 1537 56 E 1605 25 E 1673 42 E 1742 25 E 1811 45 E 1878 46 E 1946 97 E 2015 03 E 2084 70 N 64 4 E 27 N 64 4 E 72 N 64 4 E 58 N 64 5 E 06 N 64 6 E 90 N 64 7 E 59 N 64 8 E 06 N 64 7 E 62 N 64 5 E 5000 O0 4294 72 4244 72 44 41 5100 5200 5300 5400 5500 5600 5700 5800 5900 O0 4365 75 4315 O0 4436 51 4386 O0 4507 04 4457 O0 4577 69 4527 O0 4648 30 4598 00 4718.70 4668 O0 4789.11 4739 O0 4859.71 4809 O0 4930.41 4880 75 44 50 51 45 6 04 45 4 69 45 30 45 14 70 45 14 11 45 12 71 45 3 41 44 57 N 62 44 E 2154.54 N 62 29 E 2224.92 N 62 16 E 2295.56 N 62 20 E 2366.44 N 62 23 E 2437.20 N 62 10 E 2507.99 N 62 3 E 2578.99 N 61 47 E 2649.98 N 61 29 E 2720.76 N 61 25 E 2791.44 0 32 0 36 0 27 0 35 0 46 0 23 0 29 0 46 0 12 0 16 942 98 N 1937 34 E 2154 64 N 64 3 E 975 1008 1041 1073 1106 1140 1173 1207 1241 34 N 1999 13 N 2062 12 N 2125 91N 2187 88 N 2250 07 N 2313 51N 2376 19 N 2438 O0 N 2500 85 E 2225 44 E 2295 18 E 2366 90 E 2437 57 E 2508 35 E 2579 O0 E 2650 30 E 2720 42 E 2791 O1 N 64 0 E 64 N 63 57 E 50 N 63 54 E 26 N 63 51E 04 N 63 49 E 02 N 63 46 E O0 N 63 43 E 78 N 63 40 E 45 N 63 36 E 6000 O0 SO01 20 4951 20 44 58 6100 6200 6300 6400 6500 6600 6700 6800 6900 oo 5071 oo 5142 oo 5212 O0 5282 O0 5351 oo 5421 O0 5490 O0 5560 O0 5629 57 5021 23 5092 75 5162 44 5232 56 5301 28 5371 79 5440 40 5510 65 5579 57 45 29 23 44 54 75 45 28 44 4'6 12 56 46 1 28 45 53 79 45 55 4O 46 65 46 18 N 61 19 E 2862 03 N 61 34 E 2933 N 62 18 E 3003 N 62 21E 3074 N 62 27 E 3146 N 62 57 E 3218 N 63 29 E 3290 N 64 9 E 3362 N 64 13 E 3433 N 64 33 E 3506 02 77 65 35 61 30 18 98 10 0 27 1 28 0 24 0 52 0 49 1 97 0 29 0 76 0 55 0 31 1274 81 N 2562 44 E 2862 03 N 63 33 1308 1342 1374 1408 1441 1473 1505 1536 1567 88 N 2624 O0 N 2687 95 N 2750 17 N 2813 43 N 2877 63 N 2941 41N 3006 68 N 3070 78 E 2933 31E 3003 08 E 3074 64 E 3146 80 E 3218 85 E 3290 34 E 3362 96 E 3433 02 N 63 30 77 N 63 28 65 N 63 26 35 N 63 25 61 N 63 24 30 N 63 24 19 N 63 24 98 N 63 25 -2 E -2 -2 -2 E -2 E -2 84 N 3136 02 E 3506 10 N 63 26 E 7000.00 5698 94 5648.94 45 39 7100.00 5769 7200.00 5840 7300,00 5912 7400.00 5984 7500.00 6056 7600.00 6128 7700.00 6201 7800.00 6274 7900.00 6349 52 5719.52 44 54 87 5790.87 44 14 65 5862.65 44 4 47 5934.47 44 12 34 6006.34 43 50 52 6078.52 43 44 21 6151.21 42 58 76 6224.76 42 18 15 6299.15 41 43 N 64 25 E 3578 20 N 63 51E 3649 N 64 9 E 3719 N 64 27 E 3788 N 64 42 E 3858 N 64 52 E 3927 N 64 49 E 3996 N 64 56 E 4065 N 65 10 E 4133 N 65 25 E 4200 03 09 72 29 80 99 64 37 17 2.74 1.22 0.31 0 16 0 37 0 41 0 79 0 42 0 28 0 17 1598.78 N 3201 16 E 3578 20 N 63 28 E 1629 88 N 3264 1660 1690 1720 1750 1779 1808 1837 1865 57 N 3327 78 N 3390 64 N 3453 24 N 3516 68 N 3578 85 N 3641 44 N 3702 38 N 3763 80 E 3649 79 E 3719 52 E 3788 37 E 3858 29 E 3927 92 E 3996 09 E 4065 52 E 4133 23 E 4200 03 N 63 28 E 09 N 63 29 E 72 N 63 30 E 29 N 63 31E 80 N 63 32 E 99 N 63 34 E 65 N 63 35 E 38 N 63 36 E 18 N 63 38 E ARCO ALASKA, INC. Pl-04 POINT MC]NTYRE NORTH SLOPE, ALASKA COMPUTATION DATE' 30-aUG-93 PAGE 3 DATE OF SURVEY- 28-JUL-1993 KFII Y BUSHING ELEVATION' 50.00 ET ENGINEER' JEFF FORMICA · INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED YERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH.EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN 8000 O0 6423 69 6373 69 41 56 8100 8200 8300 8400 8500 8600 8700 8800 8900 N 65 32 E 4266.78 O0 6497 O0 6571 O0 6645 O0 6719 O0 6793 O0 6867 O0 6940 O0 7014 O0 7087 86 6447 51 6521 19 6595 47 6669 92 6743 62 6817 83 6890 31 6964 78 7037 86 42 19 N 65 33 E 4333.81 51 42 39 N 65 42 E 4401.40 19 42 i7 N 65 58 E 4468.96 47 41 53 N 66 i3 E 4535 85 92 42 0 N 66 4 E 4602 53 62 43 4 'N 65 6 E 4670 07 83 42 44 N 64 51 E 4738 17 31 42 42 N 64 50 E 4805 98 78 42 46 N 64 45 E 4873 80 .45 54 68 99 8i 54 56 iS 27 09 1893 02 N 3823 88 E 4266 80 N 63 40 E 1920 1948 1976 2003 2030 2058 2087 2116 2145 79 N 3884 78 N 3946 51N 4008 63 N 4069 63 N 4130 54 N 4192 39 N 4253 21N 4315 10 N 4376 93 E 4333 51E 4401 18 E 4469 40 E 4535 44 E 4602 O0 E 4670 71E 4738 i2 E 4806 49 E 4873 84 N 63 41E 44 N 63 43 E 02 N 63 45 E 91 N 63 47 E 61 N 63 49 E 17 N 63 51E 28 N 63 52 E 10 N 63 53 E 93 N 63 53 E 9000 O0 7161 25 7111 25 42 31 9100 9200 9300 9400 9500 9600 9700 9800 9900 O0 7235 O0 7309 O0 7383 O0 7458 O0 7533 O0 7608 O0 7683 O0 7758 O0 7834 09 7185 24 7259 89 7333 76 7408 81 7483 90 7558 94 7633 91 7708 07 7784 09 42 18 24 41 50 89 41 38 76 41 26 81 41 21 90 41 24 94 41 29 91 41 24 07 41 25 N 64 36 E 4941 62 N 64 17 E 5009 N 63 49 E 5076 N 63 31E 5142 N 63 19 E 5208 N 63 iO E 5275 N 63 15 E 5341 N 63 14 E 5407 N 63 9 E 5473 N 63 9 E 5539 05 14 68 97 O6 10 19 37 33 0 37 0 59 0 68 0 43 0 21 0 47 1 21 0 71 1 22 1 05 2174 10 N 4437 82 E 4941 76 N 63 54 E 2203 2232 2262 2291 2321 2351 2380 2410 2440 15 N 4498 50 N 4559 oo N 4618 67 N 4677 41N 4736 23 N 4795 99 N 4854 84 N 4913 62 N 4972 68 E 5009 O1E 5076 66 E 5142 93 E 5209 96 E 5275 88 E 5341 90 E 5407 96 E 5473 82 E 5539 19 N 63 54 E 28 N 63 55 E 83 N 63 54 E 11 N 63 54 E 20 N 63 54 E 23 N 63 53 E 32 N 63 53 E 50 N 63 52 E 46 N 63 52 E 10000 O0 7909 29 7859 29 41 11 10100 10200 10300 10400 10500 10600 10700 10800 10900 00' 7984 O0 8060 O0 8135 O0 8211 O0 8288 O0 8367 O0 8447 O0 ,8528 O0 8610 58 7934 04 8010 85 8085 93 8161 86 8238 23 8317 44 8397 46 8478 53 8560 58 40 49 04 40 56 85 40 24 93 40 28 86 39 14 23 36 5O 44 36 34 46 35 16 53 34 17 11000 O0 8693.65 8643 65 33 16 11100 00' 8777.80 8727 80 32 1 11200 O0 8863.25 8813 25 30 42 11300 O0 8949.88 8899 88 29 14 11400 O0 9037.64 8987 64 28 6 11500 O0 9126.19 9076 19 27 32 11511.00 9135.94 9085 94 27 32 N 63 2 E 5605 22 N 63 0 E 5671 N 62 45 E 5736 N 62 19 E 5801 N 62 4 E 5866 N 62 23 E 5930 N 62 8 E 5992 N 62 6 E 6052 N 60 55 E 6110 N 60 10 E 6168 04 66 85 74 61 69 39 96 O0 N 59 4 E 6223 46 N 59 18 E 6277 33 N 59 8 E 6329 14 N 58 36 E 6378 93 N 57 31 E 6426 66 N 56 44 E 6472 80 N 56 44 E 6477 85 1 53 1 12 2 96 1 13 1 30 1 24 1 50 1.59 0.76 1.56 1.92 1.80 1.39 I .62 1.70 O. O0 O. O0 2470.42 N 5031 59 E 5605 34 N 63 51 E 2500 30 N 5090 253O 2560 2590 2620 2649 2677 2705 2733 18 N 5148 23 N 5206 48 N 5263 24 N 5320 14 N 5375 15 N 5428 O5 N 5479 41N 5529 23 E 5671 65 E 5736 52 E 5801 94 E 5866 47 E 5930 43 E 5992 18 E 6052 71E 6111 3i E 6168 15 N 63 50 E 76 N 63 5O E 95 N 63 49 E 83 N 63 48 E 69 N 63 47 E 76 N 63 46 E 46 N 63 45 E 02 N 63 44 E 05 N 63 42 E 2761 69 N 5577 18 E 6223.49 N 63 39 E 2789 24 N 5623 64 E 6277 35 N 63 37 E 2815 73 N 5668 31 E 6329 15 N 63 35 E 2841 54 N 5711 08 E 6378 94 N 63 33 E 2866 90 N 5751 77 E 6426 66 N 63 30 E 2892 25 N 5790 69 E 6472 80 N 63 28 E 2895 04 N 5794 94 E 6477 85 N 63 27 E COMPUTATION DATE: 30-AUG-g3 PAGE 4 ARCO ALASKA, INC. P1-04 POINT MCINTYRE NORTH SLOPE, ALASKA DATE OF SURVEY: 2B-JUL-1993 KF/LY BUSHING ELEVATION: 50.00 FT ENGINEER: JEFF FOR~ICA INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE ~EASURED VERTICAL VERTICAL DEVIATION AZIklUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZI~JTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0 O0 1000 2000 3OO0 4000 5000 6O00 7000 8000 9000 0.00 O0 999.20 949 O0 1956.37 1906 O0 2811.16 2761 O0 3565.61 3515 O0 4294.72 4244 O0 5001.20 4951 O0 5698.94 5648 O0 6423.69 6373 O0 7161.25 7111 -50 O0 0 0 20 5 36 37 25 4 16 36 25 61 42 23 72 44 41 20 44 58 94 45 39 69 41 56 25 42 31 10000.00 7909.29 7859.29 41 11 11000.00 8693.65 8643.65 33 16 11511.00 9135.94 9085.94 27 32 N 0 0 E N 65 48 E 23 N 62 39 E 298 N 62 56 E 814 N 63 2 E 1470 N 62 44 E 2154 N 61 19 E 28~2 N 64 25 E 3578 N 65 32 E 4266 N 64 36 E 4941 0 O0 19 91 61 30 54 O3 2O 78 62 N 63 2 E 5605.22 N 59 4 E 6223.46 N 56 44 E 6477.85 0 O0 1 56 2 19 1 97 1 42 0 32 0 27 2 74 0 45 0 37 I .53 1.92 0.00 0 O0 N 7 133 354 641 942 1274 1598 1893 2174 0 O0 E 40 N 22 61N 267 73 N 733 86 N 1322 98 N 1937 81N 2562 78 N 3201 02 N 3823 10 N 4437 0.00 N 0 0 E 22 E 23.42 N 71 34 E 39 E 298.91 N 63 27 E 39 E 814.67 N 64 11 E 91 E 1470.40 N 64 7 E 34 E 2154.64 N 64 3 E 44 E 2862.03 N 63 33 E 16 E 3578.20 N 63 28 E 88 E 4266.80 N 63 40 E 82 E 4941,76 N 63 54 E 2470.42 N 5031.59 E 5605.34 N 63 51 E 2761.69 N 5577.18 E 6223.49 N 63 39 E 2895.04 N 5794.94 E 6477.85 N 63 27 E ARCO ALASKA, INC. P1-04 POINT MCINTYRE NORTH SLOPE, ALASKA TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MTN 0 O0 50 O0 150 O0 250 O0 350 O0 450 O1 550 O1 650 02 750 11 850 30 0 O0 50 O0 150 O0 250 O0 350 O0 450 O0 550 O0 650 O0 750 O0 850 O0 COMPUTATION DATE: 30-AUG-g3 PAGE 5 ' DATE OF SURVEY: 28-JUL-1993 KF! I Y BUSHING ELEVATION: 50. O0 FT ENGINEER: JEFF FORMICA INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIb~JTH 0 0 N 0 0 E 0 9 S 21 50 E 0 15 S 1 12 E 0 18 S 3 33 E 0 18 S 10 23 W 0 20 S 24 48 E 0 30 S 73 58 E 1 18 N 69 36 E 3 9 N 62 23 E 3 58 N 64 40 E -50 O0 0 O0 100 O0 200 O0 300 O0 400 O0 500 O0 600 O0 700 O0 800 O0 FEET DEG/IO0 FEET FEET FEET DEG MIN 0 O0 0 O0 -0 16 -0 33 -0 61 -0 85 -0 54 0 63 4 79 10 98 0 O0 1 10 0 O1 0 10 0 O0 0 27 0 42 2 08 0 96 0 56 0 O0 N 0 O1 S 0 40 S 0 96 S 1 48 S 2 03 S 2 44 S 2 36 S 0 40 S 2 30 N 0 O0 E 0 01E 0 02 E 0 11 E 0 06 E 0 06 E 0 61 E I 88 E 5 56 E 11 13 E 0 O0 N 0 0 E 0 0 0 1 2 2 3 5 11 O1 S 42 47 E 40 S 2 46 E 97 S 6 34 E 48 S 2 13 E 03 S I 47 E 51 S 14 2 E 02 S 38 37 E 57 S 85 52 E 36 N 78 2O E 950 60 1051 1152 1254 1356 1460 1565 1670 1777 1884 950 O0 10 1050 19 1150 17 1250 90 1350 70 1450 47 1550 84 1650 31 1750 40 1850 900.00 4 58 O0 1000.00 6 46 O0 1100.00 9 53 O0 1200.00 12 19 O0 1300 O0 14 15 O0 1400 O0 16 38 O0 1500 O0 17 53 O0 1600 O0 19 6 O0 1700 O0 20 48 O0 1800 O0 21 11 N 65 22 E N 64 58 E N 62 5 E N 59 13 E N 59 26 E N 60 52 E N 62 13 E N 64 36 E N 65 32 E N 64 22 E 18 66 28 66 43 38 63 31 86 74 114 49 145 71 178 92 215 43 253 73 1 3O 3 03 2 81 1 43 2 30 1 86 0 79 1 94 0 57 1 45 5 53 N 9 16 26 38 51 66 81 97 113 18 09 E 68 N 27 26 N 40 14 N 57 16 N 77 98 N 102 88 N 129 80 N 159 08 N 192 21N 227 18 92 N 72 59 E 20 E 28 36 E 43 72 E 63 89 E 86 O1E 114 47 E 145 14 E 178 32 E 215 08 E 253 87 N 70 25 E 51 N 68 3 E 36 N 65 38 E 74 N 63 54 E 49 N 63 0 E 72 N 62 41E 93 N 62 48 E 44 N 63 13 E 73 N 63 30 E 1992 96 1950 O0 1900.00 24 55 2104 2216 2330 2446 2563 2681 2802 2924 3048 09 2050 65 2150 52 2250 03 2350 03 2450 62 2550 02 2650 45 2750 62 '2850 O0 2000.00 26 39 O0 2100.00 27 55 O0 2200.00 29 17 O0 2300.00 30 39 O0 2400.00 31 55 O0 2500.00 33 4 O0 2600.00 34 41 O0 2700.00 35 39 O0 2800.00 37 32 3176.29 2950.00 2900.00 39 23 3307 77 3050.00 3000.00 41 17 3441 3576 3709 3842 3978 4114 4250 4388 97 3150.00 3100.00 42 25 52 3250.00 3200.00 41 27 74 3350.00 3300.00 41 11 81 3450.00 3400.00 41 49 81 3550.00 3500.00 42 40 12 3650.00 3600.00 42 21 23 3750.00 3700.00 43 13 03 3850.00 3800.00 43 29 N 62 35 E N 63 56 E N 65 31 E N 66 26 E N 64 14 E N 65 11E N 66 0 E N 63 54 E N 63 1E N 62 45 E 295 91 344 37 396 03 450 42 508 21 568 92 632 62 699 62 770 25 843 84 N 63 42 E 923 20 N 64 46 E 1008 54 N 65 11E 1098 02 N 63 52 E 1188 O1 N 64 9 E 1276 02 N 64 13 E 1363 81 N 63 6 E 1455.97 N 63 33 E 1547.13 N 64 22 E 1639.45 N 64 33 E 1734.24 2 37 1 62 1 07 1 55 0 89 1 14 0 91 1 74 0 58 1 88 2 02 I oo 0 84 0 30 0 47 1 99 1 67 O. 72 0.81 0.09 132 24 N 264 72 E 295 91 N 63 27 E 154 176 198 222 248 274 3O2 334 368 07 N 307 10 N 354 10 N 404 33 N 457 35 N 60 N 569 77 N 630 58 N 693 08 N 759 98 E 344 72 E 396 53 E 450 02 E 508 89 E 568 99 E 632 81E 699 86 E 770 4O E 843 37 N 63 25 E 03 N 63 36 E 43 N 63 55 E 23 N 64 3 E 95 N 64 7 E 68 N 64 17 E 70 N 64 22 E 32 N 64 15 E 9O N 64 8 E 404 10 N 830 11 E 923.24 N 64 3 E 440 478 517 556 594 635 676 717 757 72 N 907 21 E 1008.60 N 64 5 E 86 N 988 18 E 1098.09 N 64 9 E 50 N 1069 47 E 1188.10 N 64 11 E 15 N 1148 55 E 1276.11 N 64 10 E 16 N 1227 69 E 1363.91 N 64 10 E 37 N 1310 13 E 1456.06 N 64 8 E 54 N 1391.46 E 1547.21 N 64 4 E 06 N 1474.42 E 1639.54 N 64 4 E 90 N 1559.97 E 1734.34 N 64 5 E ARCO ALASKA, INC. P1-04 POINT MC INTYRE NORTH SLOPE, ALASKA COMPUTATION DATE: 30-AUG-93 PAGE 6 DATE OF SURVEY: 28-JUL-1993 KELLY BUSHING ELEVATION: 50.00 ET ENGINEER: JEFF FORMICA INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH 3-RUE SUB-SEA COURSE ~EASURED VERTICAL VERTICAL DEVIATION AZI~JTH DEPTH DEP1-H DEPTH DEG ~IN DEG ~IN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTL~E SECTION SEVERITY NORTH/SOU-rH EAST/WEST DIST. AZIMLrrH FEET DEG/IOO FEET FEET FEET DEG MIN 4525 17 3950 O0 3900.00 42 49 N 64 30 E 1828 08 4661 4797 4937 5077 5219 5360 5502 5644 5786 09 4O5O 91 4150 25 4250 80 4350 12 4450 81 4550 41 4650 45 4750 26 485O O0 4000.00 42 35, O0 4100.00 43 48 O0 4200.00 44 24 O0 4300 O0 44 47 oo 4400 O0 45 9 O0 45OO O0 45 4 O0 4600 O0 45 14 O0 4700 O0 45 16 O0 48OO O0 45 2 N 64 18 E 1920 N 63 23 E 2013 N 62 49 E 2110 N 62 34 E 2209 N 62 15 E 2309 N 62 25 E 2409 N 62 10 E 2509 N 61 55 E 2610 N 61 3O E 2711 12 49 52 28 11 47 71 55 05 0.44 0 19 1 2O 0 53 0 33 0 24 0 12 0 20 0 26 0 798 26 N 1644 70 E 1828 19 N 64 7 E 838 878 922 968 1014 1061 1107 1154 09 1202 04 N 1727 90 N 1811 84 N 1898 13 N 1985 44 N 2074 07 N 2163 68 N 2252 90 N 2341 55 N 2429 72 E 1920 68 E 2013 20 E 2110 97 E 2209 43 E 2309 32 E 2409 09 E 25O9 22 E 2610 76 E 2711 24 N 64 7 E 61 N 64 7 E 64 N 64 4 E 38 N 64 I E 18 N 63 56 E 53 N 63 52 E 75 N 63 49 E 57 N 63 45 E 06 N 63 40 E 5927.68 4950 O0 4900 O0 44 56 6069.20 5050 O0 5000 6210.98 5150 O0 5100 6353.26 5250 O0 5200 6497.76 5350 O0 5300 6641.30 5450 O0 5400 6785.04 5550 O0 5500 6929.45 5650 O0 5600 7072.42 5750.00 5700 7212,74 5850,00 5800 O0 45 37 O0 44 56 O0 45 50 O0 46 3 O0 46 0 O0 45 58 O0 46 17 O0 44 58 O0 44 12 7351.97 5950.00 5900 O0 44 3 7491 21 6050.00 6000 7629 7766 7901 8035 8170 8306 8440 8575 68 6150.00 6100 47 6250.00 6200 14 6350.00 6300 40 6450.00 6400 74 6550.00 6500 49 6650.00 6600 99 6750.00 6700 91 6850.00 6800 O0 43 52 O0 43 32 O0 42 31 O0 41 43 O0 42 5 oo 42 43 O0 42 13 O0 41 50 O0 42 54 8712 48 6950 O0 6900.00 42 44 8848 8984 9120 9254 9388 9521 9654 9788 9921 57 7050 72 7150 15 7250 63 7350 31 7450 58 7550 77 7650 12 7750 20 7850 O0 7000.00 42 41 O0 7100.00 42 36 O0 7200.00 42 17 O0 7300.00 41 42 O0 7400.00 41 27 O0 7500.00 41 24 O0 7600.00 41 18 O0 7700.00 41 33 O0 7800.00 41 14 N 61 26 E 2810.98 N 61 19 E 2911.05 N 62 17 E 3011.51 N 62 25 E 3112.70 N 62 55 E 3217.00 N 63 39 E 3319,98 N 64 10 E 3423.22 N 64 37 E 3527.38 N 63 46 E 3629.55 N 64 10 E 3727.97 N 64 36 E 3824.85 N 64 52 E 3921.71 N 64 49 E 4017.46 N 65 6 E 4110.77 N 65 25 E 4200.93 N 65 31 E 4290.46 N 65 33 E 4381.58 N 66 0 E 4473.32 N 66 8 E 4563.16 N 65 17 E ,4553.65 N 64 52 E 4746 64 N 64 48 E 4838 N 64 38 E 4931 N 64 13 E 5022 N 63 41E 5112 N 63 20 E 5201 N 63 7 E 5289 N 63 14 E 5377 N 63 10 E 5465 N 63 8 E 5553 91 29 61 51 23 32 30 51 32 0 25 0 28 0 25 1 06 2 02 0 53 0 60 0 2o 0 82 0 29 0 39 0 38 0 73 1 27 0 17 0 38 0 35 1 54 0 39 1 64 0 09 0 25 0 0 0 0 0 1 0 1 79 50 40 18 79 48 78 06 1250 35 N 2517.59 E 2810 98 N 63 35 E 1298 37 N 2605.46 E 2911 1345 61 N 2694.17 E 3011 1392 60 N 2783.81 E 3112 1440 70 N 2876.37 E 3217 1486 85 N 2968.42 E 3319 1532 O0 N 3061.28 E 3423 1576 97 N 3155.25 E 3527 1621,28 N 3247.32 E 3629 1664.44 N 3335.78 E 3727 05 N 63 31E 51 N 63 28 E 70 N 63 25 E O0 N 63 24 E 98 N 63 24 E 22 N 63 25 E 38 N 63 27 E 55 N 63 28 E 97 N 63 29 E 1706.33 N 3423.14 E 3824 85 N 63 30 E 1747 66 N 3510.77 E 3921 1788 1827 1865 1902 1940 1978 2014 2051 40 N 3597.45 E 4017 93 N 3682.00 E 4110 69 N 3763.92 E 4200 84 N 3845,44 E 4290 59 N 3928,44 E 4381 28 N 4012.16 E 4473 67 N 4094.41 E 4563 64 N 4177.09 E 4653 71 N 63 32 E 46 N 63 34 E 77 N 63 36 E 94 N 63 38 E 48 N 63 40 E 62 N 63 43 E 37 N 63 45 E 23 N 63 48 E 74 N 63 50 E 2090 99 N 4261.38 E 4746 75 N 63 52 E 2130 2169 2209 2248 2288 2327 2367 2407 2446 23 N 4344 92 E 4839 67 N 4428 04 N 4510 58 N 4591 20 N 4671 85 N 4749 52 N 4828 29 N 4906 94 N 4985 48 E 4931 89 E .5.022 64 E 5112 02 E 5201 68 E 5289 21 E 5377 95 E 5465 30 E 5553 03 N 63 53 E 42 N 63 54 E 75 N 63 55 E 66 N 63 55 E 38 N 63 54 E 46 N 63 53 E 43 N 63 53 E 64 N 63 52 E 44 N 63 51E COMPUTATION DATE: 30-AUG-g3 PAGE 7 ARCO ALASKA, INC. Pl-04 POINT MCINTYRE NORTH SLOPE, ALASKA DATE OF SURVEY: 28-JUL-1993 KELLY BUSHING ELEVATION: 50.00 FT ENGINEER' JEFF FORMICA INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTIC^L DEVIATION AZI~JTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 10054.12 7950 O0 7900 O0 41 21 10186.69 8050 10318 58 8150 10449 77 8250 10578 35 8350 10703 19 8450 10826 36 8550 10947 62 8650 11067 12 8750 11184 57 8850 N 62 59 E 564O 89 O0 8000 O0 8100 O0 8200 O0 8300 O0 8400 O0 8500 O0 8600 O0 8700 O0 8800 O0 41 6 N 62 49 E 5727 O0 40 18 .'.'N 62 15 E 5813 O0 39 37 N 62 15 E 5898 O0 37 29 N 62 12 E 5979 O0 36 33 N 62 6 E 6054 O0 35 9 N 60 24 E 6126 O0 33 47 N 59 23 E 6194 O0 32 31 N 59 20 E 6259 O0 30 53 N 59 16 E 6321 92 90 79 58 29 14 60 82 26 1 02 2 47 0 36 3 51 3 76 1 69 1 74 2 27 1 36 1 19 2486 61 N 5063 36 E 5641 O0 N 63 51 E 2526 2565 2605 2643 2678 2712 2746 2780 2811 19 N 5140 83 N 5217 47 N 5292 02 N 5363 O4 N 5429 5O N 5492 78 N 5552 28 N 5608 69 N 5661 88 E 5728 19 E 5814 29 E 5898 83 E 5979 86 E 6054 95 E 6126 36 E 6194 54 E 6259 53 E 6321 02 N 63 50 E O0 N 63 49 E 88 N 63 47 E 65 N 63 46 E 36 N 63 45 E 19 N 63 43 E 64 N 63 41E 84 N 63 38 E 27 N 63 35 E 11300.14 8950.00 8900.00 .29 14 11414. O1 9050.00 9000.00 27 52 11511 . O0 9135 · 94 9085 . 94 27 32 II ¢oo N 58 35 E 6379.00 N 57 20 E 6433.22 N 56 44 E 6477.85 1.62_,...2841.S8 N 5711.14 E 6379.01 N 63 33 E 2 07~J<2870 45 N 5757 33 E 6433 22 N 63 30 E 0 O0 "2895 04 N "5794 94 E 6477 85 N 63 27 E 22, ~ ~ 7 ARCO ALASKA, INC. P1-04 POINT MCINTYRE NORTH SLOPE, ALASKA MARKER GCT ~T READING 'iD COMPUTATION DATE: 30-AUG-g3 PAGE 8 DATE OF SURVEY: 28-JUL-1993 KELLY BUSHING ELEVATION: 50.00 FT ENGINEER: JEFF FORMICA INTERPOLATED VALUES FOR CHOSEN HORIZONS SURFACE LOCATION = 1463' FSL & 683' FEE, SEC16 T12N RI4E MEASURED DEPTH TVD RECTANGULAR COORDINATES BELOW KB FROM KB SUB-SEA NORTH/SOUTH EAST/WEST Z1451.O0 9082.73 9032.73 2879.80 N 5771.78 E 11511.00 9135.94 9085.94 2895.04 N 5794.94 E TRUE SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH 11511 . O0 913~. 94 9085.94 HORIZONTAL DEPARTURE DISTANCE AZIMUTH FEET DEG MIN 6477.85 N 63 27 E DIRECTIONAL SURVEY COMPANY ARCO ALASKA, INC. FIELD POINT MClNTYRE WELL P1-04 COUNTRY USA RUN ONE DATE LOGGED 28 " JUL - 93 DEPTH UNIT FEET REFERENCE 93345 guarantee the acc~uracy or ~l~en~ on our p~. a~ ~ub~ to our G~ T~ ~ Co~on~ ~ ~ ~ in ~r cu~ ~ ~u~. ~!i:LL' P1-04 ~ , " (1463' FSL, 683' FEL, SEC lb, T12N, R14E) HORIZOIITAL PROdECTION 4OOO 3OOO 1000 -2OOO SOUTH -3000 -1000 9<::,,~_~ - I / 1000 IN/FT : : . .~ ::.: :.:: .... :::: :.:. ::;:1:::. :;:: ;:.. :;;; :::: .::. : -:'' '::: '::'~ :. /iij'~/:: :::: :::: ::~: :: : :::: ii.. :~: ' !iii ....... i .... i..-i--.i-.i,=4 ................................................ i-..i.-i...i ...... i...i.-.i..i .... ;-..i--.i---i ...... i...i ....... i ..... i..-i..-i.-.i ............................................... i: -::; :.-: ::. :: : :::~ ::::'::': i:~: ii~i :::: :::: iii: :'' · · ~ i~:i--:--~: ,'-' :--; ...... ;;-:: -:-:;.-: .......................... i--.i...?-.i ..... i---i-..i--.~ ~-.-:..:..: ::. .::: ::: ~:~ :i~i iii;~iii? :!ii i!if .::: :::; :.: .... i... i.i;..}~.~: .i.. .i-~ -::: !:i! ii:! :::: :iii i:i~ :::: ii:: ,..... ,~ ~-~.-, ..... ~-~-~.-~ --~--~--, ...... ~-.~--~---: .... :---r-.~--~...~-.?..~ .............. ~..-~...~ .... ,-.-;.. ; .... :-. ~.i: ii!!· i'i'"~',~i:TM i-!,'i ?-'i!'!--'!?"?"~ i'!"!--~'"?"!'"~"i .... ?"!'"!'"i ..... ?'?'T-'! ...... !'"?"?"! ...... r"!'"P'~ ...... i:': ......... ii: ~i;.i -i.ii..~ .... ;iii. i -;ii~..ii.i..i.;.i..i..i.,.;.i...i.;.i..i..i ..... ;-.i..i.-.i ...... i...i..i-..i ..... i...;..i..i .... ;;;. ~.., .... i!'!":' !'!~"! ..... !"~ ...... ~' :'i~'i !-i':"~'";'-!'!--'?'l'!'"?'?"i"!"'i'-'i'"i ...... !"'!'"i'"! ..... i'"!'"!"'i ...... i'"i'"i'"! ..... !'"i'"i'"i";~l!lO;:)O!"! ...... , i --. i-ii:: :. i! -i i :! i"-i .... i:'i:' :i::· i : : i : !' : : :":, i i : i ! i ;'!'!':i i"i:'i.'== =============================== ==================================== ........ --=- '- :' -[ ........ ::: .' : ' .' : - ' ............. i -'-~':'"::'-i'-:-'-!!'"!''-:'"i ........ :'":'1 ......................... !'"!'"! ................... I .... ' !'''':~'!~ ! .- ~.,..:!..'~(X~i! !!'!!- ,-,!!-!.,!! !!!---!- .!-! .... :..!...!...!.!-.!..?!.. !.!!: !::' !... :-~. :ii: ~.~:.li.ii'~,~'.,':.i,i iii--i i.i-i-i .... ~-~'--i--i-.-i--i--.i .... i-..~ ...... ~-.,i.--i-.i ..... i.-.i.--i..-i ...... i-i...i.; 1. i:.. : .:~:. :: . ..M,.~:: : :! !!.: :':: 71:! ! ~!:: ~:,! :' .- : : .... : ~L~. i: ...,4'~.~ i. = ~.i.~ ~...~ i.; !i..i ;..i.i...; i.;. . . :.i ..... i...i.i .i..i.i..i. ;.i.: : , : ..... ~ i ~ : i ! ~: 00~., ..i-+-! i .... ~ ~ i-- -! ~ !.~ i.i i.~. i ! ! ! !.! ! ! : i ! i i i -! ~ !'i'l : ~ ! , ! · .i · ; ;.: i ..;., i...i .... ; ; : · . ~ ..i . .;.L-;..i ...i..~ ;..i-.-L.i...i.~ .... i...i.i--.i ...... i...i..i...i ...... i...i..i...i ....... ~...;..i...i ...... i...;...i..; ...... i...i...;..i .... i...i.i.;. ; ....... .... ~-: .............. ~.:.:. .:.~:,.:.~...~.~ ..... ~..-~...~..,~ ...... h.i..i.-i~ .... ....... ~..-~,..I..-~..~..,~ ......... ~...~..~...~ ....... :...:...~...~ ...... z...~...~...~ ...... ~...:...~...~.: ..... ....... ..... :.~ ....... - - :' ;;;;.~,~ ;,;; ~,;~1;;;, ;iii ;)}: ...... - : ........... .:::~:::: :::: iii: ii;: .:.. ..... ;-.!;---!--,i--i-~-i}--}-:--!---!.-5--: .... i--}-i-.i ...... ?-.-i---! ...... ~-.~.-?-!--:---~--i---!.-~--:--!--.i ...... ~ ..... ~'"i ...... i'"i'"r'i ...... h':'"~"! '"!"i'; ............. :;'~ ii!; !~'! ~-;i-.i ~-~!i !ii---! ;--ii!' !-ii-'i --i-!-i-i'--i-!-?'!-'i ;:'! !'"i"i'i ..... !'"!"i'i' !'!it t :': .... ;!;: .,~ ;.i.;.: ii;.;.~..i.i~; Jii~ ii.;; -.;.;,.~ .4;-..i..i -ii.i-; ..... ;.,..;.,...i-i..i...;...;..; .... ;..;..;; ..... :.. .... !'!'! -!';-i-i ..... J"i"}'i- !'i!! !!'i}' i!!i' !'!'i}' !}ii ,;ii,,;..,; .;.:ii .... ;...i...;..;.ii.,, .:.., ; ! ........ :..:~..;..:~...g...i..;.:...,...~.: ....... ~..!..~ ........ ~..+..i ...... i..+..i...; - . . - - ; ~ ~ · : ~ ~ , : i : . : ~ ~ ; , : ! : : ~ ; :' ; , ' ' : : ...:...r..:...: ..... ~...~...~...r...~...:...:...:.., ........... : ...... r...: ........ r...r...~ ......... ,.; .............. : .... · ..:: :.: ....... :.. iii:i~: .: : - :: 5;. . :: .::: .::! i i , , ~ ................................... ; ................................. ;.i L..i.i...i. .i..i.{.; .,.i ...... : . . . .: ..:; ::: .. : : ~: :: ..: :;.: .:.- ...... . ; ..... i .... i.i..i ...... ;...i .... i ...... i, ,. .... i,i.i-lli; ..... -.ii .... i-i ...:...i. ;...;...ii..i.i;;. ,.i., .... ............. : ~ . . . · : : .........:: ~ ' : - ,.: ; ~ i : ~ i ~ i i : ! ; '; ~"! ! · ! i.,-~...i..~ ; .... !...f..;.! ..... i ; . , ~ i: - : I ,,!?. ,!,; !,,-, ,,,,'!-ii,.,',, ','",',, '~'!,!' .... , 0 1000 ~>000 3O00 4OOO 5O00 6OOO 7OOO WF~T ~ WELL' P1--04 (1463' FSL, 683' FEL, SEC 16, T12N, R14E) VERTICAL PROOECTIO~ -4000 -2000 0 0 2000 4000 6000 8(XX) 10000 12000 ; . . ; .... i..~ ...i .... :..;. ;.i., ~ ~.;.i :. i...i..!.i ! !.!.i. !.i.l.i ~..~., ~ .... !..~.!..! .... !...~..i...i i..i...i...! .!...i...~...i ,..i.r!..! ::!i :Z~ : :: !!!- ::: :':: :i: ri ' : .. .;.; . ; i i i..i ..... i..i...i i.!...i.:.; .... i..~\i.. !.-;.-.i-.!. i--i--i-; ; :.i..! .... i-i .-i .... ;...i...!-i ..... i"-;--i--'i ..... i"'!"-i-"i ...... i-..i.--i--.i ;..;.i..: ...... ;..;..;..;..;.., ; ..... ..................................... !...!...:...!...~...!..-!..! ..... ~.~...~.~ ...... ....................................... ~.~ ...... ;..i.i. ,:...; :.-.; ..... L..i...i.i ..... L..i..i.i ..... i..h..i...; ~.:.: ;.. i.. i . . . :'" . ii' iii .... i::~ :~ii'~isoo~!i!i !i:~ .... i'!"!'i" i"i";"'i .... !'"i'"!'"¢'""i'"!"?! .... i'!'"i; !'!;'~ ', ' ;,,.; ~i.~; ~"':"'!'".~'! :'":'! '!'i .... ! .... !'"!'"!'"! .... f"l'"!"'! ...... !'"!'"!'"! ...... !"!'"!'"! ..... !'"!"~"! .... '"'!''!'! '!'!:": i .... ~ ~ :- - ::-}:: f ;;i. i:-. :: .......... .... i-..~,.! ....... *~ -.~.; ....... * ......... ~ ..... ;..;.; .... ~ .... ~ ..... i.--~ ............ ;..., ......... ~...i...i-..!...i.--~---i--.i .... i,-,i ....... i ...... , ...... ~-.i-~. .... :':']' :: ' ~ 6~i" '; ' :"' :':.' .... ; ''': ..... ~'"i'!"; ..... i"i ....... : !' i~ i , · ~ - . - t :'':!: :!"!'"!"':'''!"'!''!"! .......... ..... :"!":''! - -- .... ~':':~''~ :'~" ::":'':'~('";"!' ':"F"F"~ ..... F'~i'F''~'~!:"'!'"F"!TM ~:"F'~ ~ ~ ;e0oO ........ . . , ..... ' ' ' : .... ~ ~ ! ..... :-: : ~ ' ~ : ~ :'~'~"!' × 11C(10"'!'": ..... ~--!--r.! ...... !--r-! . ' ' - . ~ ' : :;~! :: : ' :~'; X :: :::: ::: : " ~ ~ :.;..: : : : ;: :: : : : :: :: · ': ~ ": : ; :': ; :';" ;:';'; i;:' 'i"!";"i":'":i' ";'"!'"!";'"/'!"!"T"i .... ?':'"!'"! .... :': : ..... . , ...... I ....... ; ..... , ......... :.; : i ......... !...i...i...i.i.i..i...i...i .i ~ i ! , r , : : .... :;.. ::: -.: !: i.~. : il:.: ' :': ...... . !!Zl :::'~':!i!'~: .... ...... ~ .... i : : ~. i ; : ;-;- i :.- : - .-: -!-:.i-! 'i : · ..... ;-..!...!--.i .... ~...i...;.; .... :..; ;.:.I. : ..:.. : . . . ~:.i :;;i .;~; .... :.,: .... ,.,: ,::i . . . : : ; i ; ..... i...:..: : ........ , ............ ~...~ ......... ! ..... ~ ....... ,...~ ..... ,.,., ..................... ,..~ .... ?.., .......... ?.?-..?..~ ...... ?--!...!...~ ........................................... -: ;, ;':i , I ill. ::i~ ii~ i~:: i:: ill! ; .......... : . .... . .~ ~ : : ...... i .... ~ : ~ ' i..i..i..i.:..~.i .: iX.i...i . ~ ! . . .... ;L~ .: ~.: : i i I , ; i i .~.: ~ ~...i.:..:i ...... i ....... ;~ .................................. i ; ..... ~ ''! .......... !"! ....... ~: .... !'!"! ........ t''!"'!'~"':!"!'! ...... "'t ...... , .... , ! i ::..ii i..i ...... i...!..i..i...: :.i-.i.-.i..il .... :.iXl ..... ;.;;.; ..~:x. :i.;; .... !...! ....... i..i..! ............... i ......... :-!-.~;-. i- PIgOJEO'13ON ON VERTICAL PLANE 24-3.0,0 e3.0~ ~CALED IN "¢1~.~1.. DEPT'H~ 14OI::HZ ~c,z.~ .. 1 2000 IN/FT ORIGINAL .. 6324/6116 Nielson Way Anchorage, AK 99518 907-563-3269 Fax: 907-563-5865 907-562-2646 Fax: 907-561-1358 BAKER HUGHES INTEQ MWD SURVEY PT. McINTYRE P1-04 WELL Eastman Teleco now Baker Hughes INTEQ appreciates the opportunity to provide our services. Please find attached a copy of the directional surveys in each of the following formats: · No Interpolation · 100' MD Interpolated · 100' TVD Interpolated RECEIVED AUG 2 5 199D Oil & ORIGINAL Baker'Hughes INTEQ Anchorage, Alaska Arco Alaska, Inc. Well Name Location Date Surveyed Job No. Survey Performed By : P1-04 : Pt. McIntyre : : : 24 May 1993 : 1219 : R. St. Pierre This survey is correct to the best of my knowledge and is supported by actual field data. ........................... COMPANY REPRESENTATIVE MEASURED DEPTH NO INTERPOLATION Client : Ar~o Alaska, Inc. Well Name : P1-04 Location : Pt. McIntyre : : No Interpolation Baker Hughes INTEQ Date 24 May 1993 Filename : 1219 Plane of Vertical Section : 64.4x Latitude & Departure relate to : WELLSITE CENTER Vertical Section Originates at : WELLSITE CENTER Slot Coordinates : Lat 0.000ft : Dep 0.000ft Directions Referenced To : TRUE NORTH Depth at Drill Floor : 0.00 ft Calculation Method : MINIMUM CURVATURE Casing Points NO DATA Points of Interest NO DATA Tool Type NO DATA Magnetic Declination : +6.00xWELLSITE North Grid convergence · -3.0000x -3x 0' 0' ' (T) Client : Ar~o Alaska, Well Name : P1-04 Location : Pt. McIntyre : : No Interpolation Inc. MD INC DIR TVD LAT ft deg deg ft ft 0 0.0 0.0 0 0 199 0.3 155.6 199 -0 308 0.3 184.4 308 -1 398 0.7 210.1 398 -2 489 0.8 203.4 489 -3 Baker Hughes DEP ft 0 0 0 0 -1 INTEQ Page 1 of 4 Date 24 May 1993 Filename : 1219 VS D'LEG BUILD TURN ft x/100 x/100 x/100 0 0o0 0.0 0.0 0 0.2 0.2 78.2 -0 0.1 0.0 26.4 -1 0.5 0.4 28.6 -2 0.1 0.1 -7.4 TOOL CASE 0 0 0 0 0 0 0 0 0 0 577 0.7 99.7 577 663 1.8 54.0 663 751 3.0 66.6 751 837 4.0 65.9 837 926 4.8 64.5 925 -3 -3 -1 1 4 -0 1 5 9 16 -2 1.3 -0.1 -99.0 0 0 0 1.6 1.3 -53.1 0 0 4 1.5 1.4 14.3 0 0 9 1.2 1.2 -0.8 0 0 16 0.9 0.9 -1.6 0 0 1020 6.1 57.5 1019 1113 9.0 64.5 1111 1208 11.6 60.7 1205 1300 13.2 60.3 1295 1392 14.9 62.4 1384 8 14 22 32 42 23 34 49 66 86 25 1.6 1.4 -7.4 37 3.3 3.1 7.5 54 2 . 8 2 . 7 -4 . 0 74 1.7 1.7 -0.4 96 1.9 1.8 2.3 1485 17.1 63.1 1473 1578 17.9 61.7 1562 1670 18.5 65.9 1649 1763 21.1 67.0 1737 1856 21.1 65.6 1824 54 67 8O 92 106 109 134 159 188 219 121 2.4 2.4 0.8 149 1.0 0.9 -1.5 178 1.6 0.7 4.6 210 2.8 2.8 1.2 243 0.5 0.0 -1.5 1949 22.7 64.2 1910 2040 25.6 63.8 1993 2131 27.0 63.5 2074 2224 27.9 65.9 2157 2317 29.0 67.0 2239 121 137 155 173 191 250 284 320 359 399 278 1.8 1.7 -1.5 315 3.2 3.2 -0.4 355 1.5 1.5 -0.3 398 1.5 1.0 2.6 442 1.3 1.2 1.2 2410 30.4 63.5 2320 2502 31.1 64.9 2399 2595 32.2 64.2 2478 2688 33.0 66.3 2556 2783 34.5 64.9 2635 210 231 252 272 294 441 483 527 573 621 488 2.4 1.5 -3.8 536 1.1 0.8 1.5 584 1.2 1.2 -0.8 634 1.5 0.9 2.3 687 1.8 1.6 -1.5 2876 35.3 63.8 2711 2969 35.8 63.8 2787 3063 37.8 63.1 2862 3157 38.9 64.5 2936 3251 40.8 66.3 3008 317 341 366 392 417 669 717 768 820 875 740 1.1 0.9 -1.2 794 0.5 0.5 0.0 851 2.2 2.1 -0.7 909 1.5 1.2 1.5 969 2.4 2.0 1.9 3345 41.3 63.5 3079 3440 42.5 66.3 3150 3531 41.6 64.5 3217 3622 41.5 64.5 3285 3717 41.2 63.8 3357 443 470 496 522 549 931 988 1044 1098 1155 1031 2.0 0.5 -3.0 1094 2.3 1.3 3.0 1155 1.6 -1.0 -2.0 1216 0.1 -0.1 0.0 1278 0.6 -0.3 -0.7 Baker Hughes INTEQ Client : Arco Alaska, Well Name : P1-04 Location ' Pt. McIntyre : : No Interpolation MD INC DIR TVD ft deg deg ft 3811 41.1 65.9 3428 3901 43.2 64.5 3494 3945 43.4 62.4 3526 4190 42.5 64.9 3706 4283 43.5 65.6 3774 Inc. LAT ft 575 601 614 688 715 DEP ft 1211 1265 1292 1442 1500 Page 2 of 4 Date 24 May 1993 Filename : 1219 VS D'LEG BUILD ft x/100 x/100 1340 1.5 -0.1 1401 2.6 2.3 1431 3.3 0.5 1598 0.8 -0.4 1661 1.2 1.1 TURN TOOL CASE x/lOO 2.2 0 0 -1.6 0 0 -4.8 0 0 1.0 0 0 0.8 0 0 4377 43.6 65.9 3842 741 1559 4472 43.2 65.9 3911 768 1618 4566 42.7 66.3 3980 794 1677 4658 42.6 65.9 4047 819 1734 4752 42.6 66.3 4116 845 1792 1726 0.2 0.1 1791 0.4 -0.4 1855 0.6 -0.5 1917 0.3 -0.1 1981 0.3 0.0 0.3 0 0 0.0 0 0 0.4 0 0 -0.4 0 0 0.4 0 0 4844 44.0 64.5 4183 871 1849 4938 44.3 63.8 4251 900 1908 5031 44.7 63.8 4317 929 1967 5125 44.8 63.5 4384 958 2026 5219 45.1 63.1 4450 988 2085 2044 2.0 1.5 2110 0.6 0.3 2175 0.4 0.4 2241 0.2 0.1 2307 0.4 0.3 -2.0 0 0 -0.7 0 0 0.0 0 0 -0.3 0 0 -0.4 0 0 5313 45.4 64.2 4517 1017 2145 5404 44.9 63.8 4581 1046 2203 5498 45.2 63.1 4647 1075 2263 5591 45.4 62.8 4713 1105 2321 5682 45.4 62.4 4777 1135 2379 2374 0.9 0.3 2439 0.6 -0.5 2505 0.6 0.3 2571 0.3 0.2 2636 0.3 0.0 1.2 0 0 -0.4 0 0 -0.7 0 0 -0.3 0 0 -0.4 0 0 5774 45.0 62.1 4841 1166 2437 5866 45.1 62.4 4906 1196 2494 5959 45.0 61.7 4972 1227 2553 6053 45.2 62.4 5038 1258 2611 6146 45.0 63.5 5104 1288 2670 2701 0.5 -0.4 2766 0.3 0.1 2832 0.5 -0.1 2899 0.6 0.2 2964 0.9 -0.2 -0.3 0 0 0.3 0 0 -0.8 0 0 0.7 0 0 1.2 0 0 6238 44.8 63.5 5169 1317 2728 6333 45.5 63.8 5236 1347 2788 6424 46.3 63.5 5300 1376 2847 6518 45.7 64.2 5365 1406 2908 6611 45.9 64.5 5430 1435 2968 3029 0.2 -0.2 3097 0.8 0.7 3162 0.9 0.9 3230 0.8 -0.6 3296 0.3 0.2 0.0 0 0 0.3 0 0 -0.3 0 0 0.7 0 0 0.3 0 0 6705 46.1 65.9 5495 1463 3029 6799 46.1 65.6 5560 1491 3091 6892 46.2 65.9 5625 1518 3152 6986 46.1 65.9 5690 1546 3214 7017 45.4 65.6 5711 1555 3234 3364 1.1 0.2 3432 0.2 0.0 3499 0.3 0.1 3566 0.1 -0.1 3589 2.4 -2.3 1.5 0 0 -0.3 0 0 0.3 0 0 0.0 0 0 -1.0 0 0 7080 45.2 64.9 5756 1574 3275 7174 44.5 65.6 5822 1602 3335 7267 44.0 65.2 5889 1629 3394 7360 44.0 65.9 5956 1655 3453 7454 44.0 65.9 6023 1682 3513 3633 0.9 -0.3 3700 0.9 -0.7 3765 0.6 -0.5 3829 0.5 0.0 3895 0.0 0.0 -1.1 0 0 0.7 0 0 -0.4 0 0 0.8 0 0 0.0 0 0 Baker Hughes INTEQ Client : Ar~o Alaska, Well Name : P1-04 Location : Pt. McIntyre : : No Interpolation MD INC DIR TVD ft deg deg ft 7546 43.8 65.6 6090 7636 43.6 66.3 6155 7730 42.8 65.9 6223 7825 42.2 66.3 6293 7918 41.7 66.3 6363 Inc. LAT ft 1708 1734 1760 1786 1811 DEP ft 3571 3627 3686 3745 3802 Page 3 of 4 Date 24 May 1993 Filename : 1219 VS D' LEG BUILD TURN ft x/100 x/100 x/100 3958 0.3 -0.2 -0.3 4020 0.6 -0.2 0.8 4085 0.9 -0.9 -0.4 4149 0.7 -0.6 0.4 4211 0.5 -0.5 0.0 TOOL CASE 0 0 0 0 0 0 0 0 0 0 8011 42.0 67.0 6432 1835 3859 8104 42.3 66.6 6501 1860 3916 8199 42.7 67.0 6571 1885 3975 8293 42.4 66.6 6640 1910 4034 8387 41.9 67.0 6710 1935 4092 4273 0.6 0.3 0.8 4335 0.4 0.3 -0.4 4400 0.5 0.4 0.4 4463 0.4 -0.3 -0.4 4526 0.6 -0.5 0.4 8481 42.0 67.3 6780 1959 4150 8574 43.0 66.3 6848 1984 4207 8667 43.0 65.9 6916 2010 4265 8758 42.6 65.9 6983 2035 4322 8852 42.7 65.9 7052 2061 4380 4589 0.2 0.1 0.3 4652 1.3 1.1 -1.1 4715 0.3 0.0 -0.4 4777 0.4 -0.4 0.0 4840 0.1 0.1 -0.0 8944 42.8 65.6 7120 2087 4437 9038 42.5 65.6 7189 2113 4495 9132 42.2 65.2 7258 2139 4552 9224 41.8 65.6 7327 2165 4608 9318 41.6 64.9 7397 2191 4665 4903 0.2 0.1 -0.3 4967 0.3 -0.3 0.0 5030 0.4 -0.3 -0.4 5091 0.5 -0.4 0.4 5154 0.5 -0.2 -0.7 9412 41.5 64.5 7467 2218 4722 9505 41.3 64.2 7537 2244 4777 9598 41.3 64.5 7607 2271 4832 9693 41.3 64.9 7678 2298 4889 9787 41.4 64.9 7749 2324 4945 5216 0.3 -0.1 -0.4 5278 0.3 -0.2 -0.3 5339 0.2 0.0 0.3 5402 0.3 0.0 0.4 5464 0.1 0.1 0.0 9880 41.3 64.9 7819 2350 5001 9974 41.1 63.8 7889 2377 5057 10068 41.0 64.2 7960 2404 5112 10162 41.0 63.8 8031 2431 5168 10255 40.6 63.5 8102 2458 5222 5525 0.1 -0.1 0.0 5587 0.8 -0.2 -1.2 5649 0.3 -0.1 0.4 5711 0.3 0.0 -0.4 5772 0.5 -0.4 -0.3 10349 40.4 63.1 8173 2486 5277 10443 39.7 63.5 8245 2513 5331 10536 39.1 64.2 8317 2539 5384 10631 36.7 63.8 8392 2564 5436 10725 36.3 63.1 8467 2589 5486 5833 0.3 -0.2 -0.4 5893 0.8 -0.7 0.4 5952 0.8 -0.6 0.8 6010 2.5 -2.5 -0.4 6066 0.6 -0.4 -0.7 10818 35.2 61.4 8543 2615 5534 10912 34.0 61.0 8620 2640 5581 11005 33.3 60.3 8698 2666 5626 11098 32.0 60.0 8776 2691 5669 11193 30.8 60.0 8857 2715 5712 6121 1.6 -1.2 -1.8 6174 1.3 -1.3 -0.4 6225 0.9 -0.8 -0.8 6275 1.4 -1.4 -0.3 6325 1.3 -1.3 0.0 Client : A~co Alaska, Well Name : P1-04 Location : Pt. McIntyre : : No Interpolation Inc. Baker Hughes INTEQ MD INC DIR TVD LAT DEP ft deg deg ft ft ft 11287 29.4 59.6 8938 2739 5753 11380 28.4 58.9 9020 2762 5792 11472 27.3 57.5 9101 2785 5828 11535 26.5 57.9 9157 2800 5852 VS D'LEG BUILD ft X/100 X/100 6372 1.5 -1.5 6416 1.1 -1.1 6459 1.4 -1.2 6487 1.3 -1.3 Page 4 of 4 Date 24 May 1993 Filename : 1219 TURN TOOL CASE x/loo -0.4 0 0 -0.8 0 0 -1.5 0 0 0.6 0 0 Origin of Bottom Hole Closure WELLSITE CENTRE Bottom Hole Closure 6487 ft 64.4x MEASURED DEPTH 100' INTERPOLATED Client Well Name Location Ar~co Alaska, P1-04 Pt. Mclntyre Inc. Baker Hughes INTEQ Page 1 of 4 Date 24 May 1993 Filename : 1219 Interpolated 100 ft of MD MD INC ft deg 0 0.0 100 0.2 200 0.3 300 0.3 400 0.7 DIR TVD LAT deg ft ft 0.0 0 0 78.2 100 -0 155.9 200 -0 182.3 300 -1 210.0 400 -2 500 0.8 190.4 500 600 1.0 87.5 600 700 2.3 59.3 700 800 3.6 66.2 800 900 4.6 64.9 900 1000 5.8 59.0 999 1100 8.6 63.5 1098 1200 11.4 61.0 1197 1300 13.2 60.3 1295 1400 15.1 62.5 1391 1500 17.2 62.9 1487 1600 18.0 62.7 1583 1700 19.3 66.3 1677 1800 21.1 66.4 1771 1900 21.9 64.9 1864 -3 -3 -2 0 3 7 13 21 32 43 DEP VS D'LEG BUILD ft £t x/100 x/100 x/100 0 0 0.0 0.0 0.0 0 0 0.2 0.2 78.2 0 0 0.3 0.1 77.7 0 -0 0.1 0.0 26.4 0 -1 0.5 0.4 27.7 -0 -2 0.3 0 -1 1.4 3 2 1.5 7 7 1.3 14 14 1.0 0.1 -19.5 0.2 -99.0 1.3 -28.2 1.3 6.9 1.0 -1.3 TURN TOOL CASE 0 0 0 0 0 0 0 0 0 0 22 23 1.4 1.3 -5.9 33 35 2.8 2.8 4.5 48 52 2.8 2.8 -2.5 66 74 1.8 1.8 -0.7 88 98 2.0 1.9 2.2 56 113 126 2.1 2.1 0.4 0 0 70 140 156 0.8 0.8 -0.2 0 0 84 169 188 1.7 1.3 3.6 0 0 98 200 223 1.8 1.8 0.2 0 0 113 234 259 0.9 0.8 -1.5 0 0 2000 24.3 64.0 1956 130 269 299 2.5 2100 26.5 63.6 2047 149 308 342 2.2 2200 27.7 65.3 2136 168 349 387 1.4 2300 28.8 66.8 2224 188 392 434 1.3 2400 30.2 63.9 2311 208 437 484 2.0 2500 31.1 64.9 2397 230 482 534 1.0 2600 32.2 64.3 2482 253 530 587 1.2 2700 33.2 66.1 2566 275 579 641 1.4 2800 34.6 64.7 2649 298 630 697 1.7 2900 35.4 63.8 2731 323 681 754 0.9 734 813 1.0 788 874 1.8 845 937 1.9 904 1001 1.3 964 1068 1.0 3000 36.5 63.6 2812 349 3100 38.2 63.7 2891 376 3200 39.8 65.3 2969 404 3300 41.1 64.8 3045 431 3400 42.0 65.1 3120 459 3500 41.9 65.1 3194 487 3600 41.5 64.5 3269 515 3700 41.3 63.9 3344 544 3800 41.1 65.6 3419 572 3900 43.2 64.5 3494 600 1025 1135 0.1 1085 1201 0.6 1145 1267 0.5 1204 1333 1.1 1265 1400 2.2 2.5 -1.0 2.2 -0.4 1.1 1.7 1.1 1.5 1.5 -2.9 0.8 1.0 0 0 1.2 -0.6 0 0 0.9 1.8 0 0 1.5 -1.4 0 0 0.8 -0.9 0 0 1.0 -0.2 1.8 0.1 1.5 1.7 1.3 -0.5 0.9 0.3 0.1 -0.0 0.4 -0.6 0.3 -0.6 0.1 1.7 2.1 -1.1 Client Well Name Location Ar. co Alaska, P1-04 Pt. McIntyre Inc. Baker Hughes INTEQ Page 2 of 4 Date 24 May 1993 Filename : 1219 Interpolated 100 ft of MD MD INC DIR ft deg deg 4000 43.2 63.0 4100 42.8 64.0 4200 42.6 65.0 4300 43.5 65.7 4400 43.5 65.9 4500 43.1 66.0 4600 42.7 66.2 4700 42.6 66.1 4800 43.3 65.4 4900 44.2 64.1 5000 44.6 63.8 5100 44.8 63.6 5200 45.0 63.2 5300 45.4 64.0 5400 44.9 63.8 5500 45.2 63.1 5600 45.4 62.8 5700 45.3 62.3 5800 45.0 62.2 5900 45.1 62.1 6000 45.1 62.0 6100 45.1 63.0 6200 44.9 63.5 6300 45.3 63.7 6400 46.1 63.6 6500 45.8 64.1 6600 45.9 64.5 6700 46.1 65.8 6800 46.1 65.6 6900 46.2 65.9 7000 45.8 65.8 7100 45.1 65.0 7200 44.4 65.5 7300 44.0 65.4 7400 44.0 65.9 7500 43.9 65.8 7600 43.7 66.0 7700 43.1 66.0 7800 42.4 66.2 7900 41.8 66.3 TVD ft 3567 3640 3713 3786 3858 3931 4005 4078 4151 4224 4295 4366 4437 4508 4578 4649 4719 4789 4860 4930 5001 5072 5142 5213 5283 5352 5422 5492 5561 5630 5700 5770 5841 5913 5985 6057 6129 6201 6275 6349 LAT ft 631 661 691 720 748 776 8O3 831 859 888 919 950 982 1013 1044 1076 1108 1141 1174 1207 1240 1273 1305 1337 1368 1400 1431 1461 1491 1521 1550 1580 1609 1638 1667 1695 1723 1751 1779 1806 DEP ft 1326 1387 1448 1510 1573 VS D'LEG BUILD ft x/100 x/100 1468 1.1 0.0 1536 0.8 -0.4 1605 0.7 -0.2 1673 1.0 0.9 1742 0.2 -0.0 1636 1810 0.5 -0.5 1698 1878 0.4 -0.4 1760 1946 0.1 -0.1 1822 2014 0.9 0.7 1884 2083 1.2 0.8 1947 2153 0.4 0.4 2010 2223 0.3 0.2 2073 2294 0.4 0.3 2137 2365 0.7 0.3 2201 2436 0.5 -0.4 2264 2507 0.6 0.3 2327 2578 0.3 0.2 2390 2649 0.3 -0.1 2453 2720 0.3 -0.3 2516 2790 0.0 0.0 2578 2861 0.1 0.0 2641 2932 0.7 0.0 2704 3003 0.4 -0.2 2768 3073 0.4 0.4 2832 3145 0.8 0.8 2896 3217 0.4 -0.3 2961 3288 0.3 0.1 3026 3360 1.0 0.2 3092 3432 0.2 0.0 3157 3504 0.2 0.1 3223 3577 0.4 -0.4 3288 3648 0.9 -0.7 3352 3718 0.8 -0.7 3415 3788 0.4 -0.4 3478 3857 0.3 0.0 3542 3926 0.1 -0.1 3605 3996 0.3 -0.2 3668 4064 0.6 -0.6 3730 4132 0.7 -0.7 3791 4199 0.6 -0.6 TURN TOOL CASE x/loo -1.6 0 0 1.0 0 0 1.0 0 0 0.7 0 0 0.2 0 0 0.1 0 0 0.1 0 0 -0.1 0 0 -0.7 0 0 -1.3 0 0 -0.3 0 0 -0.2 0 0 -0.4 0 0 0.9 0 0 -0.2 0 0 -0.7 0 0 -0.3 0 0 -0.4 0 0 -0.2 0 0 -0.0 0 0 -0.1 0 0 1.0 0 0 0.5 0 0 0.2 0 0 -0.1 0 0 0.5 0 0 0.4 0 0 1.4 0 0 -0.2 0 0 0.3 0 0 -0.1 0 0 -0.7 0 0 0.4 0 0 -0.0 0 0 0.5 0 0 -0.2 0 0 0.3 0 0 0.0 0 0 0.2 0 0 0.1 0 0 Client Well Name Location ALco Alaska, Pl-04 Pt. McIntyre Inc. Baker Hughes INTEQ Page 3 of 4 Date 24 May 1993 Filename : 1219 Interpolated 100 ft of MD MD INC DIR TVD LAT DEP ft deg deg ft ft ft 8000 42.0 66.9 6424 1832 3852 8100 42.3 66.6 6498 1859 3914 8200 42.7 67.0 6572 1885 3976 8300 42.4 66.6 6645 1912 4038 8400 41.9 67.0 6719 1938 4100 8500 42.2 67.1 6794 1964 4161 8600 43.0 66.2 6867 1991 4224 8700 42.9 65.9 6940 2019 4286 8800 42.6 65.9 7014 2047 4348 8900 42.8 65.7 7087 2074 4410 9000 42.6 65.6 7161 2102 4471 9100 42.3 65.3 7235 2130 4533 9200 41.9 65.5 7309 2158 4594 9300 41.6 65.0 7383 2186 4654 9400 41.5 64.6 7458 2214 4714 9500 41.3 64.2 7533 2243 4774 9600 41.3 64.5 7608 2272 4833 9700 41.3 64.9 7683 2300 4893 9800 41.4 64.9 7759 2328 4953 9900 41.3 64.7 7834 2356 5013 10000 41.1 63.9 7909 2385 5072 10100 41.0 64.1 7984 2413 5131 10200 40.8 63.7 8060 2442 5190 10300 40.5 63.3 8136 2471 5248 10400 40.0 63.3 8212 2500 5306 10500 39.3 63.9 8289 2529 5363 10600 37.5 63.9 8367 2556 5419 10700 36.4 63.3 8447 2583 5473 10800 35.4 61.7 8528 2610 5525 10900 34.2 61.1 8610 2637 5575 11000 33.3 60.3 8693 2664 5623 11100 32.0 60.0 8778 2691 5670 11200 30.7 60.0 8863 2717 5715 11300 29.3 59.5 8950 2742 5758 11400 28.2 58.6 9037 2767 5800 11500 26.9 57.7 9126 2791 5839 11535 26.5 57.9 9157 2800 5852 VS D'LEG BUILD ft x/100 x/100 4266 0.4 0.2 4333 0.4 0.3 4400 0.5 0.4 4468 0.4 -0.3 4535 0.5 -0.4 4602 0.3 0.3 4669 1.0 0.8 4737 0.2 -0.1 4805 0.2 -0.2 4873 0.2 0.1 4941 0.2 -0.1 5008 0.4 -0.3 5075 0.4 -0.4 5142 0.4 -0.3 5208 0.3 -0.1 5275 0.3 -0.2 5341 0.2 -0.0 5407 0.3 0.0 5473 0.1 0.1 5539 0.2 -0.1 5604 0.5 -0.2 5670 0.1 -0.1 5736 0.3 -0.2 5801 0.4 -0.3 5865 0.5 -0.5 5929 0.8 -0.7 5991 1.8 -1.8 6051 1.1 -1.1 6110 1.3 -1.0 6167 1.3 -1.3 6223 0.9 -0.8 6276 1.4 -1.4 6328 1.3 -1.3 6378 1.5 -1.4 6426 1.2 -1.1 6472 1.3 -1.2 6487 1.7 -1.7 TURN TOOL CASE x/loo 0.6 0 0 -0.3 0 0 O.4 0 0 -O.4 0 0 0.4 0 0 0.1 0 0 -0.9 0 0 -0.3 0 0 -0.0 0 0 -0.2 0 0 -0.1 0 0 -0.3 0 0 0.2 0 0 -0.5 0 0 -0.5 0 0 -0.3 0 0 0.3 0 0 0.4 0 0 0.0 0 0 -0.2 0 0 -0.8 0 0 0.2 0 0 -0.4 0 0 -0.4 0 0 0.0 0 0 0.6 0 0 0.0 0 0 -0.6 0 0 -1.6 0 0 -0.7 0 0 -0.7 0 0 -0.3 0 0 -0.0 0 0 -0.5 0 0 -0.9 0 0 -0.9 0 0 -0.7 0 0 Client : Ar~o Alaska, Inc. Well Name : P1-04 Location : Pt. McIntyre : : Baker Hughes INTEQ Origin of Bottom Hole Closure WELLSITE CENTRE Bottom Hole Closure 6487 ft 64.4x Page 4 of 4 Date 24 May 1993 Filename : 1219 Interpolated 100 ft of MD TRUE VERTICAL DEPTH 100' INTERPOLATED Client Well Name Location A~co Alaska, P1-04 Pt. McIntyre Inc. Baker Hughes INTEQ Page 1 of 3 Date 24 May 1993 Filename : 1219 Interpolated 100 ft of TVD MD INC ft deg 0 0.0 100 0.2 200 0.3 300 0.3 400 0.7 DIR TVD LAT DEP VS D' deg ft ft ft ft x/ 0.0 0 0 0 0 78.2 100 -0 0 0 155.9 200 -0 0 0 182.3 300 -1 0 -0 210.0 400 -2 0 -1 500 0.8 190.4 500 600 1.0 87.5 600 700 2.3 59.3 700 800 3.6 66.2 800 900 4.6 64.9 900 1001 5.8 1102 8.6 1203 11.5 1306 13.3 1409 15.3 58.9 1000 63.6 1100 60.9 1200 60.4 1300 62.5 1400 -3 -0 -2 -3 0 -1 -2 3 2 0 7 7 3 14 14 7 22 23 13 33 35 22 48 53 32 68 75 45 90 100 1513 17.3 62.7 1500 58 116 130 1618 18.2 63.5 1600 73 145 162 1724 20.0 66.5 1700 87 176 196 1831 21.1 66.0 1800 102 211 234 1938 22.5 64.4 1900 119 247 274 2048 25.7 63.8 2000 138 287 319 2160 27.3 64.2 2100 160 332 369 2273 28.5 66.5 2200 182 380 421 2388 30.1 64.3 2300 205 431 477 2504 31.1 64.9 2400 231 484 536 2621 32.4 64.8 2500 257 540 599 2741 33.8 65.5 2600 285 600 664 2862 35.2 64.0 2700 314 662 732 2985 36.1 63.7 2800 346 726 804 3111 38.4 63.8 2900 380 795 881 3240 40.6 66.1 3000 414 869 962 3373 41.7 64.3 3100 451 948 1050 3508 41.8 65.0 3200 489 1029 1140 3641 41.4 64.4 3300 527 1110 1229 3774 41.1 65.1 3400 565 1189 1316 3909 43.2 64.1 3500 603 1270 1406 4046 43.0 63.4 3600 645 1354 1499 4182 42.5 64.8 3700 686 1437 1593 4319 43.5 65.7 3800 725 1522 1686 4457 43.3 65.9 3900 764 1609 1781 LEG BUILD TURN TOOL CASE lOO x/loo x/loo 0.0 0.0 0.0 0 0 0.2 0.2 78.2 0 0 0.3 0.1 77.7 0 0 0.1 0.0 26.4 0 0 0.5 0.4 27.7 0 0 0.3 0.1 -19.5 0 0 1.4 0.2 -99.0 0 0 1.5 1.3 -28.1 0 0 1.3 1.3 6.9 0 0 1.0 1.0 -1.3 0 0 1.4 1.3 -6.0 0 0 2.8 2 .8 4.7 0 0 2.8 2 .8 -2.7 0 0 1.8 1.8 -0.5 0 0 2.0 1.9 2.0 0 0 2.0 2.0 0.1 0 0 0.8 0.8 0.8 0 0 2.0 1.7 2.8 0 0 1.0 1.0 -0.5 0 0 1.4 1.3 -1.5 0 0 2.9 2.9 -0.5 0 0 1.4 1.4 0.4 0 0 1.4 1.1 2.0 0 0 1.7 1.4 -1.9 0 0 0.9 0.9 0.5 0 0 1.1 1.1 -0.1 0 0 1.2 1.2 0.6 0 0 1.3 1.1 -1.3 0 0 0.8 0.8 -0.2 0 0 1.8 1.8 0.1 0 0 2.1 1.7 1.8 0 0 1.2 0.8 -1.3 0 0 0.3 0.1 0.5 0 0 0.4 -0. 3 -0.5 0 0 0.4 -0.2 0.5 0 0 1.6 1.6 -0.7 0 0 0.4 -0.2 -0.5 0 0 0.8 -0.4 1.0 0 0 0.9 0.7 0.7 0 0 0.2 -0.2 0.1 0 0 Client Well Name Location ArEo Alaska, P1-04 Pt. Mclntyre Inc. Baker Hughes INTEQ Page 2 of 3 Date 24 May 1993 Filename : 1219 Interpolated 100 ft of TVD MD ft 4594 4730 4867 5007 5148 5289 5431 5573 5715 5857 5999 6140 6282 6425 6568 6712 6856 7001 7142 7282 7421 7560 7698 7834 7968 8103 8239 8374 8509 8645 8781 8917 9053 9188 9322 9456 9589 9722 9855 9988 INC deg 42.7 42.6 44.1 44.6 44.9 45.3 45.0 45.4 45.3 45.1 45.1 45.0 45.1 46.3 45.8 46.1 46.2 45.8 44.7 44.0 44.0 43.8 43.1 42.2 41.9 42.3 42.6 42.0 42.3 43.0 42.6 42.8 42.5 42.0 41.6 41.4 41.3 41.3 41.3 41.1 DIR TVD LAT DEP deg ft ft ft 66.2 4000 802 1694 66.2 4100 839 1778 64.3 4200 878 1864 63.8 4300 921 1951 63.4 4400 965 2040 63.9 4500 1010 2130 63.6 4600 1054 2220 62.9 4700 1100 2310 62.3 4800 1146 2400 62.4 4900 1193 2489 62.0 5000 1240 2577 63.4 5100 1286 2666 63.6 5200 1331 2756 63.5 5300 1376 2847 64.4 5400 1421 2940 65.9 5500 1465 3034 65.8 5600 1508 3129 65.8 5700 1550 3224 65.4 5800 1592 3315 65.3 5900 1633 3404 65.9 6000 1673 3492 65.7 6100 1712 3580 66.0 6200 1751 3666 66.3 6300 1788 3750 66.7 6400 1824 3833 66.6 6500 1860 3916 66.8 6600 1896 4000 66.9 6700 1931 4084 67.0 6800 1967 4167 66.0 6900 2004 4251 65.9 7000 2041 4336 65.7 7100 2079 4420 65.5 7200 2117 4504 65.4 7300 2155 4586 64.9 7400 2192 4668 64.4 7500 2230 4748 64.5 7600 2268 4827 64.9 7700 2306 4906 64.9 7800 2343 4986 63.9 7900 2381 5065 VS D'LEG BUILD ft x/loo x/lOO x/1 TURN TOOL CASE 1874 0.5 -0.4 0 1966 0.1 -0.1 0 2060 1.4 1.1 -1 2158 0.5 0.4 -0 2257 0.3 0.2 -0 00 .2 0 0 .0 0 0 .4 0 0 .4 0 0 .3 0 0 2357 0.4 0.3 0 2458 0.3 -0.2 -0 2558 0.5 0.3 -0 2660 0.3 -0.1 -0 2760 0.1 -0.1 0 .4 0 0 .2 0 0 .5 0 0 .4 0 0 .1 0 0 2860 0.2 -0.0 -0 2960 0.7 -0.1 1 3060 0.1 0.1 0 3162 0.8 0.8 -0 3266 0.5 -0.3 0 .3 0 0 .0 0 0 .1 0 0 .1 0 0 .6 0 0 3369 0.8 0.2 1.1 3473 0.1 0.0 -0.1 3577 0.3 -0.3 -0.0 3678 0.8 -0.7 -0.3 3775 0.5 -0.5 -0.0 0 0 0 0 0 0 0 0 0 0 3872 0.3 0.0 0.4 0 0 3968 0.2 -0.2 -0.1 0 0 4063 0.5 -0.5 0.2 0 0 4155 0.7 -0.7 0.2 0 0 4245 0.3 -0.2 0.3 0 0 4335 0.3 0.3 -0.1 4426 0.2 0.2 0.2 4517 0.4 -0.4 0.1 4607 0.2 0.2 0.0 4700 0.7 0.5 -0.7 4792 0.3 -0.3 -0.1 4885 0.2 0.1 -0.2 4977 0.2 -0.2 -0.1 5067 0.4 -0.4 -0.1 5157 0.4 -0.3 -0.4 5245 0.3 -0.1 -0.4 5333 0.1 -0.1 0.1 5421 0.2 0.0 0.3 5509 0.0 -0.0 0.0 5597 0.5 -0.2 -0.8 Client : Ar~o Alaska, Well Name : P1-04 Location : Pt. McIntyre : : Inc. Baker Hughes INTEQ Page 3 of 3 Date 24 May 1993 Filename : 1219 Interpolated 100 ft of TVD MD INC DIR TVD LAT DEP ft deg deg ft ft ft 10121 41.0 64.0 8000 2419 5143 10253 40.6 63.5 8100 2457 5221 10384 40.1 63.2 8200 2496 5297 10514 39.2 64.0 8300 2533 5371 10641 36.7 63.7 8400 2567 5441 10765 35.8 62.4 8500 2600 5507 10887 34.3 61.1 8600 2634 5569 11008 33.3 60.3 8700 2666 5627 11126 31.6 60.0 8800 2698 5682 11243 30.1 59.8 8900 2728 5734 11357 28.6 59.1 9000 2756 5782 11471 27.3 57.5 9100 2784 5828 11535 26.5 57.9 9157 2800 5852 VS D'LEG BUILD ft x/lO0 x/lO0 5684 0.1 -0.1 5770 0.4 -0.3 5855 0.4 -0.4 5938 0.8 -0.7 6016 2.0 -2.0 6090 0.9 -0.7 6160 1.4 -1.2 6227 1.0 -0.9 6290 1.4 -1.4 6350 1.4 -1.4 6406 1.3 -1.2 6459 1.3 -1.2 6487 2.0 -1.9 TURN TOOL CASE x/loo 0.1 0 0 -0.4 0 0 -0.2 0 0 0.6 0 0 -0.2 0 0 -1.1 0 0 -1.0 0 0 -0.7 0 0 -0.2 0 0 -0.2 0 0 -0.6 0 0 -1.4 0 0 -1.0 0 0 Origin of Bottom Hole Closure WELLSITE CENTRE Bottom Hole Closure 6487 ft 64.4x ARCO Alaska, Inc. _.tsburne/Point McIntyre Engineet..~_, Date: Subject: From: To: August 19, 1993 Transmittal #350 ARCO Alaska Inc. Bob Crandall AOGCC 3001 Porcupine Drive Anchorage, AK 99501 The following Point McIntyre data are enclosed. This information is confidential and your cooperation in maintaining confidentiality is appreciated. Log Well Title 1blue line, 1 sepia P1-Gl-'Perforating Record Run # 1 Run Date 7/4/93 Company Schlumberger P1-04-'Z-Densilog Compensated Neutron -GR Pl-04-Dual Laterolog, GR / SP ,z.'r~~' P1-04- Borehole Profile P1-04- Sub-Sea Vertical Depth (Single Shot Data) Pl-04.,-Cement Bond Log -~ '~m P1-04"Cement Evaluation Log (CET) P1-04.-Gyro Continuous Survey (GCT) I 5/22/93 Altas '- 9 1 ~/22/93 Atlas I 5/22/93 Atlas I 5/22/93 Atlas 1 6/12/93 Schlumberger 1 6/12/93 Schlumberger I 7/28/93 Schlumberger P1-05- Segmented Bond Log, Gamma Ray -CCL P1-05-, Cement Bond Log-CBT w/Jewelry P1-05-' Cement Evaluation Log-CET w/Jewelry P1-05- Gyro Continuous Survey -GCT 1 7/11/93 1 8/12/93 I 8/12/93 1 8/12/93 Atlas Schlumberger Schlumberger Schlumberger Pl-13-'Neutron Poro, Density Poro, GR -MD Pl-13-Neutron Poro, Density Poro, GR -TVD Pl-13 -- Dual Prop Resis, GR -MD Pl-13 ~'Dual Prop Resis, GR -TVD Pl-13- Dens Poro, Neu Poro, Dual Prop Resis, GR-MD P1-13 ~Dens Poro, Neu Poro, Dual Prop Resis, GR-TVD ~P1-13 wBulk Density, Gamma Ray -MD ~" 5-7 6/2-6/93 BakerHughes 5-7 6/2-6/93 BakerHughes 5-7 6/2-6/93 BakerHughes 5-7 6/2-6/93 BakerHughes 5-72e~ 6/2-6/93 BakerHughes 5-7 2-.~ 6/2-6/93 BakerHughes 5-7 6/2-6/93 BakerHughes Pl-14-Engineering Parameters MD 2-'~ ~ Pl-14-Pressure Data Log Pl-14--Formation Evaluation MD r' ~1oo-~m~t~ P1-14-Formation Evaluation TVD ~-~--~8 - 2/26-3/6/93 - 2/26-3/6/93 - 2/26-3/6/93 - 2/26-3/6/93 Exlog Exlog BakerHughes BakerHughes PLEASE SIGN ONE COPY AND RETURN Transmittal ¢350 (AOGCC) Log (contd.) Well Title 1blue line, 1 sepia Pl-16 -' Engineering Parameters MD /Pl_16.~Pressure Data Log ~P!-16.~Formation Evaluation MD ~Pl-16,.-Formation Evaluation TVD Run .# Pl-17- Bulk Density -Gamma Ray -MD 5 Pl -17 -- Dual Prop Resis -GR-MD ~t'5" P1-17 .-'Dual Prop Resis -GR ~TVD 14-5 * Pl-17,-'Dens Poro, Neutron Poro -GR-MD P1-17- Dens Poro, Neutron Poro -GR -TVD 5,SRR 5,SRR 5,SRR 5,SRR 5,SRR Pl-17-"~sPoro, NeuPoro, DualProp, ResisKlR-M-D :~" 5,SRR Fl-17- EensPoro, Neu Foro, Duall'~op, Re~sKiR-TVD i+~" 5,5NI% Run Date - 3/19-28/93 - 3/1%28/93 - 3/1%28/93 - 3/1%28/93 4/14-16/93 4/14-t6/93 4/14-16/93 4/14-!6/93 4/14-t6/93 4/14-16/93 4/14--16/93 Page 2 Company E.'dog E.-dog BakerHughes BakerHughes Baker Hughes Baker Hughes Baker Hughes Baker Hughes Baker Hughes Baker Hughes Baker Hughes Diskette/Tape (w/verification) Well Title Run # ct%-L~/P1-04 \P1-04 crb-'~ P1-I3 q 1~'%% PI-16 Final MWD Survey b\6~- DLL / CN / ZDL / GR in LDWG Format Final MWD Survey b~2~, Dual Prop Resis, Neutron, Density, GR'~ q%-qk P!-I7 Dual Prop Resis, Neu, Dens, GR-Depth Shifted 5,SRR Run Date 5/24/93 5/~/93 6/11/93 3/29/93 4/16/93 Company BakerHughes Atlas Sperry Sun BakerHughes BakerHughes Please sign ___ and return to: Transmittal #350 Laura S. Lahrson, ATO-409 ARCO Alaska, Inc. P.O. BOX 100360 Anchorage, Alaska 99510-0360 PLEASE SIGN ONE COPY AND RETURN WALTER J. HICKEL, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION April 26, 1993 R. M. Lemon Drilling Engineer Supervisor ARCO Alaska, Inc. P O Box 196612 Anchorag,e AK 99519-6612 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 Re: . Point McIntyre P1-04 ~RCO Alaska, Inc. Permit No: 93-63 Sur. Loc. 1463'NSL, 683'WEL, Sec. 16, T12N, R14E, UM Btmhole Loc. 1011'SNL, 13'WEL, Sec. 15, T12N, R14E, UM Dear Mr. Lemon: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. David ~Johnsto~ Chairman BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA ~IL AND GAS CONSERVATION COIvIMISSION PERMIT TO DRILL 2O AAC 25.OO5 la. Type of work Drill [] Redrilll-lllb. Type of well. Exploratoryl-1 Stratigraphic Test C1 Development oilr~l Re-Entry [] DeepenCII Service [] Development Gas [] Single Zone [] Multiple Zone [] 12. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, inc. KBE -= 50'feet Point Mclntyre !3. Address 6. Property Designation P. O. Box 196612. Anchoraoe. Alaska 99519-6612 ADL 28297 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025) 1463' NSL, 683' WEL, SEC. 16. T12N, R14E ~--¢-+~b~it f? ?t,., , ~ At top of productive interval 8. Well number Number 1142' SNL, 291' WEL, SEC. 15, T12N, R14E P1-04 U-630610 At total depth 9. Approximate spud date Amount 1011' SNL, 13' WEL, SEC. 15, T12N, R14E 5/10/93 $200,000.00 12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth(uoandTVD) property line ADL 34624-13' feet P1-3-15' @50' MD feet 2560 11637' MD/9207' TVD[eet 16. To be completed for deviated wells 17. Anticipated pressure (s~ 20 ,~c 25.035 (e)(2)) Kickoff depth 5oofeet Maximum hole an~ile ,~,~ o Maximum surface 3330psig At total depth (TVD) 8800'/4390psig 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 26" 20" 91.5~ H-40 Weld 80' Surface Surface 80' 80' 281 cu ft Arcticset 13-1/2" 10-3/4" 45.5~ NT8OLHE B TC 3875' 41' 41' 3986' 3550' 253e cu ft PF "E'/406 cu ft "G"/235 cu ft PF 'C' 9- 7/8" 7-5/8" 29. 7# ¥ T95H~ NSCC 10 780' 41' 41' 10821' 8503' 9-7/8" 7-5/8" 29. 7# 13CR NSCC 816' 10821' 8503' 11637' 9207' 710 cu fl Class "G" 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural sCu°rlda Or R EE E IV E D Intermediate Production2 0 199:;;5 Liner Alaska 0ii & Gas Cons. Commission Perforation depth: measured true vertical Anchorage 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program l~l Drilling fluid program [] Time vs depth pict [] Refraction analysis F-I Seabed report[] 20 AAC 25.050 requirements[] 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed"~:' ~ "'~~,~'~'L~ Title Drilling EngineerSupervisor Date Commission Use Only Permit Number IAPI number IAppro~v? date JSee cover letter ~'Z--'~',.~ 150- oz?,- .z.2.~¢~ I -~-.:,¢,&--~z; ~ Ifor other requirements Conditions of approval Samples required [] Yes ~ No Mud log required []Yes ~ No Hydrogen sulfide measures [] Yes [] No Directional survey required .1~ Yes [] No Required working pressure for BOPE 1-12M; F13M; I~SM; r-IloM; I-I15M; "" by order of Other: Origina! o~gned By Commissioner me commission Date~,-?c,~ '-/ Approved by David W. John.qtnn Form 10-401 Rev. 12-1-85 Submit in triplicate WELL PLAN SUMMAi WELL NAME' P1-04 / H7 WELL TYPE' Slimhole, Iongstring AFE NUMBER: AFC #2C0024 INITIAL COMPLETION' Producer SURFACE LOCATION: 1463'FSL, 683'FEL, SEC 16, T12N, R14E TARGET LOCATION- 1142' FNL, 291' FEL, SEC 15, T12N, R14E BOTTOM HOLE LOCATION- 1011FNL, 13'FEL, SEC 15, T12N, R14E TOTAL DEPTH' 11637' md / 9207' tvd brt CONTRACTOR: POOL 7 ELEVATION' RTE-SS' 50' RTE-GL: 41' GL-SS: 9' DIRECTIONAL INFORMATION' S-Shape to 30° at target=8674' tvd brt, 6266' departure. KOP: 500' Angle/dir.' 44°/N65°E Build Rate: 1.5/100'md EOB' 3442' MD/3159' TVD DROP: 10080'md/7924' tvdbrt Hold 30° from top Kuparuk to TD. MUD PROGRAM' Surface hole = typical spud mud. Production hole (9-7/8")=3% KCL water. FORMATION MARKERS: TVDss MD WEST SAK 6690 8432 K-10 8390 10746 STUMP ISLAND 8390 10746 TARGET (KUPARUK) 8624 11022 MILUVEACH 9059 11524 TD 9157 11637 RECEIVED APR 2 0 199,~ Alaska 0ii & Gas Cons. Commission Anchorage CASING PROGRAM. Hole Csg Wt Grade Conn Length ToD Btm 26" 20" 91.5 H-40 WELD 80 GL 80 13-1/2" 10-3/4" 45.5# NT80LHE BTC 3875 41 3986(3500tvdss) 9-7/8" 7-5/8" 29.7# NT95HS NSCC 10780 41 10821 9-7/8" 7-5/8" 29.7# 13 Cr NSCC 816 10821 11637 Tbg Wt Grade Coupling Length Top Btm 4-1/2" 12.6# 13Cr NSCT 10859 41 10921 LOGGING PROGRAM' Open Hole Logs: Surface NONE Final Mud Loos' NONE MWD' (~R/Resistivity/Neutron/Density from top of West Sak to TD Wireline: GR/Resistivity/Neutron/Density from top of West Sak to TD. Cased Hole Logs: Cement bond Icg and gyro after rig release. COMPLETION- 4-1/2" 13Cr tubing with estimated 5 GLM's (4-1/2" x 1") above top packer. Tubing retreivable sub-surface saftey valve. A sliding sleeve will be run above the packer for future downhole separator installation. 'SING DESIGN SPECIFIC, ONS SURFACE CASING 10-3/4" 45.5#/FT, NT80LHE, BTC BURST COLLAPSE PBYS # TJYS # NT80LHE 551 0 3390 1040000 1063000 I · Burst Pressure The burst rating is based on shutting the well in on a gas kick with pressure equivalent to the leak-off at the surface casing shoe: Burst Pressure = 14 ppg (LOT) @ 3500' tvd = 2548 psi. Safety Factor = 2.16 . Collapse Pressure The scenario for collapse rating is based on having lost circulation such that the fluid level drops below the surface casing shoe and there is 9.5 ppg mud in the annulus: Collapse pressure = 9.5 * 3500 * .052 = 1729 psi Saftey Factor = 1.96 = Tension Tension is based on full string weight in mud. A maximum casing length of 5000' is assumed, and a vertical hole is assumed (for worst case scenario): Tension = 45.5 * 5000 * .85 = 193375 # Saftey Factor (pipe body) = 5.38 ~ E C E IV E D Saftey Factor (joint) = 5.50 7-5/8"~ PRODUCTION CASING 29.7 #/FT, NT95HS, 13CR80 APR 2 0 199~ Alaska Oil & Gas Cons. Commission Anchorage NSC¢ NT95HS (0-8200' tvd+-) 13CR80 (8200'+--TD) BURST COLLAPSE PBYS # TJYS # 8180 7200 811000 813000 6890 4790 683000 721000 I · . = Burst Pressure The worst case scenario is a tubing leak at reservoir pressure at the surface (with the NT95HS grade) with no annulus backup. Maximum shut-in tubing pressure= burst pressure= 4360 - (.15 * 8810') = 3038 psi Saftey Factor = 8180 / 3038 = 2.69 Collapse Pressure Assume the casing is evacuated to gas lift gas with 10.0 ppg mud in the annulus (worst case on bottom with 13CR80 grade): Collapse pressure= 8750"10.5'.052 = 4777 psi Saftey Factor = 4790 / 4777 = 1,01 Tension Based on a full string weight in 10 ppg mud. A maximum casing length of 16000' is assumed as a worst case scenario (at surface with NT 95HS grade): Tension = 29.7'16000'.85= 403920 #. Saftey Factor = 811000 /403920 = 2.01 Saftey Factor (joint) = 2. 01 P1-04 MUD PROGRAM SURFACE MUD PROPERTIES: TYPICAL Density Marsh Yield 10 sec (ppg) Viscosity Point gel Spud 8.7 300 40-60 30-60 TD 9.5 100 20-40 15-20 Surface 10 rain pH Fluid gel Loss 60-80 9-10 15-25 20-30 9-10 15-25 FINAL HOLE MUD PROPERTIES: 3% KCL Density PV YP 10 sec (ppg) gel 10-3/4" 9.5 8-15 25-35 5-15 SHOE 10 min pH Fluid gel Loss 10-20 9-10 10-15 TD 10.0 15-30 25-35 8-12 <25 9-9.5 4-15 <15 HTHP NOTE' ADJUST YP FOR HOLE CLEANING. MAINTAIN MINIMUM YP 25 FROM SURFACE CASING SHOE TO TD. RECEIVED APR 2 0 t99,,3 Alaska Oil & Gas Cons. Commission Anchorage . . . . . . . 10. . . MIRU drilling rig. P1 -O4/H7 Operations Summary Spud well and drill 13-1/2" hole to 3986' md/3550' tvd building angle to 44 degrees. Set 10-3/4" casing and cement same. Test casing to 3000 psi for 30 minutes. Nipple up BOPs and test same to 5000 psi. Pick up 9-7/8" BHA and ddll 10' of new hole and perform leakoff test. Continue drilling to 10080' md, 7924' tvd, drop angle to 30°, drill ahead to TD 11637' md / 9206 tvd. Run open hole logs. Set 7 5/8" carbon and chrome casing and cement same, displacing with seawater. Test casing to 3500 psi for 30 minutes. Run 4-1/2" Chrome simple tubing completion and tree. Displace tubing to diesel and freeze protect well with 2000' of diesel in annulus. Release rig. Run cased hole logs' cement bond log, gyro. RECEIVED APR 2 0 !99,~ ~,laska 0JJ & Gas Cons. Oommissior~ ~ncl~orage Surface Casing Depth: Surface Casing Size: Surface Casing Weight: Bit Diameter: Excess Factor Intermediate Casing Depth: Intermediate Casing Size Intermediate Casing Weight: Proposed Top of Cement Bit Diameter: Excess Factor: PI-04/H? Cement Volumes Surface String 3986 10 3/4 45.5 13.5 2 LEAD (TYPE "E" PERMAFROST) Yield 2.17 Density 1 2 # sacks 1170 (2538 Cu. Ft.) TAIL (CLASS G) Yield 1.1 6 Density 15.8 # sacks 350 (406 Cu. Ft.) TOP JOB (TYPE "C" PERMAFROST) # sacks 2 50 (235 Cu. Ft.) .94 cuft/sx 15.6 ppg Intermediate String 11 637 7 5/8 29.7 10021 9 7/8 1.9 LEAD Yield 1.98 Density 1 5 # sacks 0 # bbls 0 TAIL (CLASS G) Yield 1.16 Density 15.8 # sacks 61 2 # bbls 1 26 ( 0 Cu. Ft.) (710 Cu. Ft.) Alaska Oil & Gas Cons. oomm~ss~O° Anchorage Prudhoe Drillin Pain[ MoIn[yre P -O4 H7 ©© VERTICAL VIEW SCALE 1000 Pt, / DIVISIF1N REFERENCE: WELL HEAP 6£00 6550 7(00 7934 - 8C00 8250 8440 8674 10500 I -1500 I 0.00' @ 0 MD R,K.B, 50' (ABOVE SEA LEVEL) 0.00° @ 500 MI) KOP 8 1.5/100' BUILI) RATE, 1.50 DEG/IO0 FT 3.00° ~ 700 MD r .... 6. 00' ~ 900 MB t .... CRITICAL PDINT DATA 9,00* ~ I100 MD / HD Ina AzI TVD Nor~ East /R,K,B. DO'S.S,0 0,00 0.00 0 0  1~,00' ~ 1900 MD /KDP e ~.S/~O0'SO0 0.00 0.00 5OO 0 /END OF BUILD 344244.I364.713l~ 460 975 ~ 1~,00' e 1500 MD /~0 3/4' CSG. PT~6 44.I~~.7] ~ /VEST SAK e~6~~.~ 6~.7~6550 ~6~ 39~e /START DF DRDP 10080 44.1364.7I79~4 ~435 5153 ~ 18,00' e 1700 MD /K-~O ~0~ ~7,666~,7~eeDo ~55~ D,oe 5533 64.7i8440 2614 /STUMP ISLAND 1074634. 14  ~1. 00' ~ 1900 MD  ~4. 00' ~ 2100 MD /TARGET/KUPARUK 11022 30.0064.718674 2677 5665 /MILUVEACH ] 1524 30. O0 64.7I9109 2784 589~  ~7.00' ~ ~300 MD ~WDC 1153630.0064.7]9119 ~786 5898 / 1153730, O0 64.719~eO e787 5898 ~ 30. 00' ~ ~500 M~ LTDTAL DEPTH 1163730.0064.719~07 ~808 5943 ~ 33.00' e 8700 ND ~ 36,00' e 8900 ND ~ 39,00* 8 3]00 ND ~ 48.00~ 8 3300 ND ~ 44.13' e 3448 ND END BF BUILD 078 %% 44.13~ e 364~ ND Alaska OH & Gas Cons. 5700 5982 6119 6266 6523 6573 4367 I I I I -500 500 1500 2500 Anchorage MD WEST SAK 44.13" @ 10042 MD 44.13° ~ 10080 ND START OF DROP @ 1.5/100'  41.13' I~ 10;~80 MD 38.13' ~ 10480 MD 37.66' ~ 10511 MD K-la 35.13° @ 10680 MD 34,14' ~ 10746 MD STUMP ISLAND 30.63' ~ 10980 MD 30,00° l~ 11022 MD TARGET/KUPARUK 30,00° @ 11222 MD 30.00' ~ [1536 MD S/DC VERTICAL SECT IE]N I I I I 3500 4500 5500 6500 64,71° BHL DATA TVD 92o6.6q MD 11636.7~ vs 6573,3~ North ~808.0~ East 5943,4 Po n-t McTn-ty e ? _-04/H7 H[ZR~ZIZINTAL SCALE L 000 DIVISION lRLE N DO,12 de9 Ea~.'~ Dedina±~on ]00 3OO0 R,K.S. 50' ('ABOVE SE 0 0,00 0,00 0 0 0 KDP ~ ],5/1~ ~O 0.00 0.00 500 0 0 END OF BUILD 34~ 4443 64.7] 3159 460 975 ~0 3/4' CSG. PT. 39~ 4443 64.71 ~0 602 ~873 I~EST SAK 8165 4443 64.7~ 6~0 ~5 3948 START OF OR~ et~O 4443 64.7~ 7~4 84~ 5~53 K-lO 1~ 37.66 64.7~ ~0 ~55 54~ STU~ ISLED ,0746 3444 64.7, 8440 2614 55~ TAR~I/KUPA~ 11~2 30,00 64,71 ~74 ~77 5665 NILUVE~H 11 ~4 30.00 64,71 9~09 8784 58~ HOC 11536 30,00 64,7] 9~9 87~ 58~ 1~53F 30,00 64,7] 9180 8787 58~ TBT~ DEPTH 11637 30,0~4,F] 9~7 ~ 5943 JO00 0 JO00 2000 3000 4000 5000 6000 ---800O 000 JO00 7000 BHL DATA TVD 9206,60 MD 11636,73 VS 6573.37 Nonth 2808,02 East 5943,42 Smith International, Inc. Proposal Report Calculated using the Minimum Curvature Method Computed by the Sii Win-CADDS System Vertical Section Plane: 64.71 deg. Page 1 Date: 12/21/92 WeLlpath ID: PI-O4/H7PW2 Last Revision: 12/21/92 Survey Reference: WELLHEAD Reference World Coordinates: Lat. 70.23.27.27 N - Long. 148.34.52.95 Reference GRID System: Alaska State Plane Zone: ALaska 4 Reference GRID Coordinates: (feet): 5994594.00 N 674374.00 E Vertical Section Reference: WELLHEAD Closure Reference: WELLHEAD North Aligned To: TRUE NORTH Prudhoe Bay Drilling Point Mclntyre P1-O4/H7 Oil &,Gas Ooa$ ,, '~TCfiorage' ~°~7~ission Measured Inc[ Drift TVD Subsea T 0 T A L Depth Dir. Depth Rectangular Offsets (ft) (deg,) (deg.) (ft) (ft) (ft) (ft) R.K.B. 50' (ABOVE SEA LEVEL) 0.00 0.00 0.00 0.00 -50.00 0.00 N 0.00 E 100.00 0.00 0.00 100.00 50.00 0.00 N 0.00 E 200.00 0.00 0.00 200.00 150.00 0.00 N 0.00 E 300.00 0.00 0.00 300.00 250.00 0.00 N 0.00 E 400.00 0.00 0.00 400.00 350.00 0.00 N 0.00 E KOP @ 1.5°/100' 500.00 0.00 0.00 500.00 450.00 0.00 N 0.00 E 600.00 1.50 64.71 599.99 549.99 0.56 N 1.18 E 700.00 3.00 64.71 699.91 649.91 2.24 N 4.73 E 800.00 4.50 64.71 799.69 749.69 5.03 N 10.65 E 900.00 6.00 64.71 899.27 849.27 8.94 N 18.92 E 1000.00 7.50 64.71 998.57 948.57 13.96 N 29.55 E 1100.00 9.00 64.71 1097.54 1047.54 20.09 N 42.52 E 1200.00 10.50 64.71 1196.09 1146.09 27.32 N 57.83 E 1300.00 12.00 64.71 1294.16 1244.16 35.66 N 75.47 E 1400.00 13.50 64.71 1391.70 1341.70 45.08 N 95.42 E 1500.00 15.00 64.71 1488.62 1438.62 55.60 N 117.68 E 1600.00 16.50 64.71 1584.86 1534.86 67.19 N 142.22 E 1700.00 18.00 64.71 1680.36 1630.36 79.86 N 169.03 E 1800.00 19.50 64.71 1775.05 1725.05 93.59 N 198.10 E 1900.00 21.00 64.71 1868.86 1818.86 108.38 N 229.39 E 2000.00 22.50 64.71 1961.74 1911.74 124.21 N 262.89 E 2100.00 24.00 64.71 2053.62 2003.62 141.07 N 298.58 2200.00 25.50 64.71 2144.43 2094.43 158.95 N 336.44 2300.00 27.00 64.71 2234.12 2184.12 177.85 N 376.43 2400.00 28.50 64.71 2322.61 2272.61 197.74 N 418.52 E 2500.00 30.00 64.71 2409.86 2359.86 218.61 N 462.70 E 2600.00 31.50 64.71 2495.80 2445.80 240.45 N 508.93 E 2700.00 33.00 64.71 2580.37 2530.37 263.24 N 557.18 E 2800.00 34.50 64.71 2663.51 2613.51 286.97 N 607.41 E Geographic Coordinates Latitude / Longitude 70.23.27.2683 N 148.34.52.9463 70.23.27.2683 N 148.34.52.9463 70.23.27.2683 N 148.34.52.9463 70.23.27.2683 N 148.34.52.9463 70.23.27.2683 N 148.34.52.9463 70.23.27.2683 N 148.34.52.9463 70.23.27.2738 N 148.34.52.9116 70.23.27.2903 N 148.34.52.8077 70.23.27.3178 N 148.34.52.6345 70.23.27.3562 N 148.34.52.3923 70.23.27.4056 N 148.34.52.0811 70.23.27.4659 N 148.34.51.7011 70.23.27.5370 N 148.34.51.2528 70.23.27.6190 N 148.34.50.7362 70.23.27.7117 N 148.34.50.1519 70.23.27.8151 N 148.34.49.5002 70.23.27.9292 N 148.34.48.7815 70.23.28.0537 N 148.34.47.9963 70.23.28.1888 N 148.34.47.1453 70.23.28.3342 N 148.34.46.2289 70.23.28.4899 N 148.34.45.2477 70.23.28.6557 N 148.34.44.2026 70.23.28.8316 N 148.34.43.0941 70.23.29.0174 N 148.34.41.9230 70.23.29.2130 N 148.34.40.6902 70.23.29.4183 N 148.34.39.3965 70.23.29.6331 N 148.34.38.0427 70.23.29.8573 N 148.34.36.6298 70.23.30.0907 N 148.34.35.1588 GRID Coordinates Northing Easting (ft) (ft) 5994594.00 674374.00 5994594.00 674374.00 5994594.00 674374.00 5994594.00 674374.00 5994594.00 674374.00 5994594.00 674374.00 5994594.59 674375.17 5994596.34 674378.68 5994599.28 674384.53 5994603.38 674392.71 5994608.64 674403.21 5994615.07 674416.04 5994622.66 674431.18 5994631.40 674448.62 5994641.29 674468.34 5994652.33 674490.35 5994664.49 674514.61 5994677.78 674541.12 5994692.18 674569.85 5994707.70 674600.79 5994724.30 674633.92 5994741.99 674669.20 5994760.75 674706.62 5994780.58 674746.16 5994801.44 674787.78 5994823.34 674831.46 5994846.26 674877.16 5994870.17 674924.86 5994895.07 674974.52 CLosure Dist. Dir. (ft) deg. 0.00 @ 0.00 0.00 @ 0.00 0.00 @ 0.00 0.00 @ 0.00 0.00 @ 0.00 0.00 @ 0.00 1.31 @ 64.71 5.23 @ 64.71 11.77 @ 64.71 20.92 @ 64.71 32.68 @ 64.71 47.03 @ 64.71 63.96 @ 64.71 83.47 @ 64.71 105.54 @ 64.71 130.15 @ 64.71 157.30 @ 64.71 186.95 @ 64.71 219.09 @ 64.71 253.70 @ 64.71 290.76 @ 64.71 330.23 @ 64.71 372.10 @ 64.71 416.32 @ 64.71 462.88 @ 64.71 511.75 @ 64.71 562.87 @ 64.71 616.23 @ 64.71 671.79 @ 64.71 Vertical Section (ft) 0.00 0.00 0.00 0.00 0.00 0.00 1.31 5.23 11.77 20.92 32.68 47.03 63.96 83.47 105.54 130.15 157.30 186.95 219.09 253.70 290.76 330.23 372.10 416.32 462.88 511.75 562.87 616.23 671.79 (dg/lOOft) 0.00 0.00 0.00 0.00 0.00 0.00 1.50 1.50 1.50 1.50 1.50 ,, ,'lli, 1 .~0 1.50 1.50 1,50 1.50 1,50 1.50 1.50 1.50 1,50 1,50 1.50 1.50 1.50 1.50 1.50 Smith International, Inc. Proposal Report Page 2 Date: 12/21/92 YeLLpath ID: PI-O4/HTPW2 Measured Incl Drift TVD Depth Dir. (ft) (deg.) (deg.) (ft) 2900.00 36,00 64.71 2745.17 3000.00 37,50 64.71 2825.30 3100.00 39.00 64.71 2903.83 3200.00 40.50 64.71 2980.71 3300.00 42.00 64.71 3055.89 3400.00 43.50 64.71 3129.32 END OF BUILD 3441.76 44.13 64.71 3159.45 3541.76 44.13 64.71 3231.23 3641.76 44.13 64.71 3303.01 3741.76 44.13 64.71 3374.80 3841.76 44.13 64.71 3446.58 3/4" CSG. PT. 3916.19 44.13 64.71 3500.00 3941.76 44.13 64.71 3518.36 4041.76 44.13 64.71 3590.14 4141.76 44.13 64.71 3661.92 4241.76 44.13 64.71 3733.70 4341.76 44.13 64.71 3805.48 4441.76 44.13 64.71 3877.26 4541.76 44.13 64.71 3949.04 4641.76 44.13 64.71 4020.82 4741.76 44.13 64.71 4092.60 4841.76 44.13 64.71 4164.38 4941.76 44.13 64.71 4236.16 5041.76 44.13 64.71 4307.94 5141.76 44.13 64.71 4379.72 5241.76 44.13 64.71 4451.50 5341.76 44.13 64.71 4523.28 5441.76 44.13 64.71 4595.07 5541.76 44.13 64.71 4666.85 5641.76 44.13 64.71 4738.63 5741.76 44.13 64.71 4810.41 5841.76 44.13 64.71 4882.19 5941.76 44.13 64.71 4953.97 6041.76 44.13 64.71 5025.75 6141.76 44.13 64.71 5097.53 6241.76 44.13 64.71 5169.31 Subsea T 0 T A L Depth Rectangular Offsets (ft) (ft) (ft) 2695.17 311.63 N 659.59 E 2775.30 337.19 N 713.69 E 2853.83 363.63 N 769.66 E 2930.71 390.95 N 827.48 E 3005.89 419.11 N 887.09 E 3079.32 448.11 N 948.46 E 3109.45 460.46 N 974.60 E 3181.23 490.20 N 1037.55 E 3253.01 519.94 N 1100.51 E 3324.80 549.69 N 1163.46 E 3396.58 579.43 N 1226.41 E 3450.00 601.56 N 1273.26 E 3468.36 609.17 N 1289.36 E 3540.14 638.91 N 1352.31 E 3611.92 668.65 N 1415.27 E 3683.70 698.40 N 1478.22 E 3755.48 728.14 N 1541.17 E 3827.26 757.88 N 1604.12 E 3899.04 787.62 N 1667.07 E 3970.82 817.36 N 1730.03 E 4042.60 847.11 N 1792.98 E 4114.38 876.85 N 1855.93 E 4186.16 906.59 N 1918.88 E 4257.94 936.33 N 1981.83 E 4329.72 966.08 N 2044.79 E 4401.50 995.82 N 2107.74 E 4473.28 1025.56 N 2170.69 E 4545.07 1055.30 N 2233.64 E 4616.85 1085.04 N 2296.59 E 4688.63 1114.79 N 2359.55 E 4760.41 1144.53 N 2422.50 E 4832.19 1174.27 N 2485.45 E 4903.97 1204.01 N 2548.40 E 4975.75 1233.75 N 2611.35 E 5047.53 1263.50 N 2674.31 E 5119.31 1293.24 N 2737.26 E 6341.76 44.13 64.71 5241.09 5191.09 1322.98 N 2800.21 E 6441.76 44.13 64.71 5312.87 5262.87 1352.72 N 2863.16 E 6541.76 44.13 64.71 5384.65 5334.65 1382.47 N 2926.11 E Geographic Coordinates Latitude / Longitude 70.23.30.3332 N 148.34.33.6307 70.23.30.5846 N 148.34.32.0464 70.23.30.8447 N 148.34.30.4072 70.23.31.1133 N 148.34.28.7141 70.23.31.3903 N 148.34.26.9683 70.23.31.6755 N 148.34.25.1710 70.23.31.7970 N 70.23.32.0895 N 70.23.32.3820 N 148.34.24.4055 148.34.22.5619 148.34.20.7183 70.23.32.6745 N 148.34.18.8747 70.23.32.9670 N 148.34.17.0311 70.23.33.1847 N 148.34.15.6590 70.23.33.2595 N 148.34.15.1875 70.23.33.5520 N 148.34.13.3439 70.23.33.8446 N 148.34.11.5003 70.23.34.1371 N 70.23.34.4296 N 70.23.34.7221 N 148.34.09.6566 148.34.07.8130 148.34.05.9693 70.23.35.0146 N 70.23.35.3071 N 70.23.35.5997 N 148.34.04.1257 W 148.34.02.2820 ~ 148.34.00.4384 ~ 70.23.35.8922 N 70.23.36.1847 N 70.23.36.4772 N 148.33.58.5947 148.33.56.7510 148.33.54.9073 70.23.36.7697 N 70.23.37.0622 N 70.23.37.3548 N 148.33.53.0636 148.33.51.2199 148.33.49.3762 70.23.37.6473 N 70.23.37.9398 N 70.23.38.2323 N 148.33.47.5325 148.33.45.6887 148.33.43.8450 70.23.38.5248 N 70.23.38.8173 N 70.23.39.1099 N 148.33.42.0013 148.33.40.1575 148.33.38.3138 70.23.39.4024 N 70.23.39.6949 N 70.23.39.9874 N 148.33.36.4700 148.33.34.6262 148.33.32.7824 70.23.40.2799 N 70.23.40.5724 N 70.23.40.8650 N 148.33.30.9387 148.33.29.0949 148.33.27.2511 GRID Coordinates Northing Easting (ft) (ft) 5994920.94 675026.11 5994947.76 675079.59 5994975.51 675134,93 5995004.17 675192.08 5995033.72 675251.02 5995064.15 675311.70 Closure Dist. Dir. (ft) deg. Vertical DLS Section (ft) (dg/lOOft) 729.50 @ 64.71 729.50 1.50 789.33 @ 64.71 789.33 1.50 851.24 @ 64.71 851.24 1.50 915.18 @ 64.71 915.18 1.50 981.11 @ 64.71 981.11 1.50 1048.99 @ 64.71 1048.99 1.50 5995077.11 675337.54 1077.90 @ 64.71 5995108.31 675399.77 1147.53 @ 64.71 5995139.52 675462.01 1217.15 @ 64.71 5995170.73 675524.24 1286.78 @ 64.71 5995201.95 675586.48 1356.40 @ 64.71 5995225.18 675632.79 1408.22 @ 64.71 5995233.16 675648.71 1426.02 @ 64.71 5995264.37 675710.94 1495.65 @ 64.71 5995295.58 675773.18 1565.27 @ 64.71 5995326.80 675835.41 1634.90 @ 64.71 5995358.01 675897.64 1704.52 @ 64.71 5995389.22 675959.87 1774.15 @ 64.71 5995420.44 676022.11 1843.77 @ 64.71 5995451.65 676084.34 1913.39 @ 64.71 5995482.87 676146.57 1983.02 @ 64.71 5995514.08 676208.80 2052.64 @ 64.71 5995545.30 676271.03 2122.27 @ 64.71 5995576.52 676333.27 2191.89 @ 64.71 5995607.74 676395.50 2261.52 @ 64.71 5995638.95 676457.73 2331.14 @ 64.71 5995670.17 676519.96 2400.76 @ 64.71 5995701.39 676582.19 2470.39 @ 64.71 5995732.61 676644.42 2540.01 @ 64.71 5995763.83 676706.65 2609.64 @ 64.71 5995795.05 676768.88 2679.26 5995826.28 676831.10 2748.89 5995857.50 676893.33 2818.51 5995888.72 676955.56 2888.13 5995919.94 677017.79 2957.76 5995951.17 677080.02 3027.38 @ 64.71 @ 64.71 @ 64.71 @ 64.71 @ 64.71 @ 64.71 @ 64.71 @ 64.71 @ 64.71 5995982.39 677142.25 3097.01 5996013.62 677204.47 3166.63 5996044.84 677266.70 3236.26 1077.90 1.50 1147.53 O.Pq 1217.15 ~ 1286.78 O. 1356.40 0.00 1408.22 0.00 1426.02 0.00 1495.65 0.00 1565.27 0.00 1634.90 0.00 1704.52 0.00 1774.15 0.00 1843.77 0.00 1913.39 0.00 1983.02 0.00 2052.64 0.00 2122.27 0.00 2191.89 0 2261.52 2331.14 2400.76 0,00 2470.39 0.00 2540.01 0.00 2609.64 0.00 2679.26 0.00 2748.89 0.00 2818.51 0.00 2888.13 0.00 2957.76 0.00 3027.38 0.00 3097.01 0.00 3166.63 0.00 3236.26 0.00 6641.76 44.13 64.71 5456.43 5406.43 1412.21 N 2989.07 E 70.23.41.1575 N 148.33.25.4073 W 5996076.07 677328.93 3305.88 @ 64.71 3305.88 0.00 Smith International, Inc. Proposal Report Page 3 Date: 12/21/92 Yellpath ID: PI-O4/H7PW2 Measured Inc[ Drift TVD Depth Dir. (ft) (deg.) (deg.) (ft) 6741.76 44,13 64.71 5528.21 6841.76 44.13 64.71 5599.99 6941.76 44.13 64.71 5671.77 Subsea T 0 T A L Depth Rectangular Offsets (ft) (ft) (ft) 5478.21 1441.95 N 3052.02 E 5549.99 1471.69 N 3114.97 E 5621.77 1501.43 N 3177.92 E 7041.76 44.13 64.71 5743.55 5693.55 1531.18 N 3240.87 E 7141.76 44.13 64.71 5815.34 5765.34 1560.92 N 3303.83 E 7241.76 44.13 64.71 5887.12 5837.12 1590.66 N 3366.78 E 7341.76 44.13 64.71 5958.90 5908.90 1620.40 N 3429.73 E 7441.76 44.13 64.71 6030.68 5980.68 1650.14 N 3492.68 E 7541.76 44.13 64.71 6102.46 6052.46 1679.89 N 3555.63 E 7641.76 44.13 64.71 6174.24 6124.24 1709.63 N 3618.59 E 7741.76 44.13 64.71 6246.02 6196.02 1739.37 N 3681.54 E 7841.76 44.13 64.71 6317.80 6267.80 1769.11 N 3744.49 E 7941.76 44.13 64.71 6389.58 8041.76 44.13 64.71 6461.36 8141.76 44.13 64.71 6533.14 WEST SAK _ 8165 . 24 44.13 64.71 6550.00 8241.76 44.13 64.71 6604.92  41.76 44 . 13 64.71 6676.70 8441.76 44.13 64.71 6748.48 8541.76 44 . 13 64.71 6820.26 8641.76 44.13 64.71 6892.04 8741.76 44.13 64.71 6963.82 8841.76 44.13 64.71 7035.61 8941.76 44.13 64.71 7107.39 9041.76 44.13 64.71 7179.17 9141.76 44.13 64.71 7250.95 9241.76 44.13 64.71 7322.73 9341.76 44.13 64.71 7394.51 9441.76 44.13 64.71 7466.29 9541.76 44.13 64.71 7538.07 6339.58 1798.86 N 3807.44 E 6411.36 1828.60 N 3870.39 E 6483.14 1858.34 N 3933.35 E 6500.00 1865.33 N 3948.13 E 6554.92 1888.08 N 3996.30 E 6626.70 1917.82 N 4059.25 E 6698.48 1947.57 N 4122.20 E 6770.26 1977.31 N 4185.15 E 6842.04 2007.05 N 4248.11 E 6913.82 2036.79 N 4311.06 E 6985.61 2066.53 N 4374.01 E 7057.39 2096.28 N 4436.96 E 7129.17 2126.02 N 4499.91 E 7200.95 2155.76 N 4562.87 E 7272.73 2185.50 N 4625.82 E 7344.51 2215.25 N 4688.77 E 7416.29 2244.99 N 4751.72 E 7488.07 2274.73 N 4814.67 E 9641.76 44.13 64.71 7609.85 7559.85 2304.47 N 4877.63 E 9741.76 44.13 64.71 7681.63 7631.63 2334.21 N 4940.58 E 9841.76 44.13 64.71 7753.41 7703.41 2363.96 N 5003.53 E 9941.76 44.13 64.71 7825.19 7775.19 2393.70 N 5066.48 £ 10041.76 44.13 64.71 7896.97 7846.97 2423.44 N 5129.43 E START OF DROP @ 1.5°/100' 10079.98 44.13 64.71 7924.41 7874.41 2434.81N 5153.49 E 10179.98 42.63 64.71 7997.09 7947.09 2464.15 N 5215.59 E 10279.98 41.13 64.71 8071.55 8021.55 2492.66 N 5275.94 E 10379.98 39.63 64.71 8147.72 8097.72 2520.33 N 5334.51 E Geographic Coordinates Latitude / Longitude 70.23.41.4500 N 70.23.41.7425 N 70.23.42.0350 N 148.33.23.5634 148.33.21.7196 148.33.19.8758 70.23.42.3275 N 70.23.42.6201 N 70.23.42.9126 N 148.33.18.0319 148.33.16.1881 148.33.14.3442 70.23.43.2051 N 70.23.43.4976 N 70.23.43.7901 N 148.33.12.5004 148.33.10.6565 148.33.08.8126 70.23.44.0826 N 70.23.44.3752 N 70.23.44.6677 N 148.33.06.9688 148.33.05.1249 148.33.03.2810 70.23.44.9602 N 70.23.45.2527 N 70.23.45.5452 N 148.33.01.4371W 148.32.59.5932 148.32.57.7492 70.23.45.6139 N 70.23.45.8377 N 70.23.46.1303 N 70.23.46.4228 N 70.23.46.7153 N 70.23.47.0078 N 148.32.57.3162 148.32.55.9053 148.32.54.0614 148.32.52.2174 148.32.50.3735 148.32.48.5295 70.23.47.3003 N 70.23.47.5928 N 70.23.47.8854 N 148.32.46.6856 148.32.44.8416 148.32.42.9976 70.23.48.1779 N 70.23.48.4704 N 70.23.48.7629 N 148.32.41.1536 148.32.39.3097 148.32.37.4657 70.23.49.0554 N 70.23.49.3479 N 70.23.49.6405 N 148.32.35.6216 148.32.33.7776 148.32.31.9336 70.23.49.9330 N 70.23.50.2255 N 70.23.50.5180 N 148.32.30.0896 148.32.28.2455 148.32.26.4015 70.23.50.8105 N 148.32.24.5575 70.23.51.1030 N 148.32.22.7134 70.23.51.2148 N 148.32.22.0086 70.23.51.5034 N 70.23.51.7838 N 70.23.52.0560 N 148.32.20.1896 148.32.18.4217 148.32.16.7059 GRID Coordinates Northing Easting (ft) (ft) Closure Dist. Dir. (ft) deg. 5996107.29 677391.15 3375.50 5996138.52 677453.38 3445.13 5996169.75 677515.61 3514.75 @ 64.71 @ 64.71 @ 64.71 5996200.97 677577.83 3584.38 5996232.20 677640.06 3654.00 5996263.43 677702.28 3723.63 @ 64.71 @ 64.71 @ 64.71 5996294.66 677764.51 5996325.89 677826.73 5996357.12 677888.96 3793.25 3862.88 3932.50 @ 64.71 @ 64.71 @ 64.71 5996388.35 677951.18 4002.12 @ 64.71 5996419.58 678013.41 4071.75 @ 64.71 5996450.82 678075.63 4141.37 @ 64.71 5996482.05 678137.85 4211.00 5996513.28 678200.08 4280.62 5996544.51 678262.30 4350.25 @ 64.71 @ 64.71 @ 64.71 5996551.85 678276.91 4366.60 5996575.75 678324.52 4419.87 5996606.98 678386.74 4489.49 @ 64.71 @ 64.71 @ 64.71 5996638.22 678448.97 4559.12 5996669.45 678511.19 4628.74 5996700.69 678573.41 4698.37 @ 64.71 @ 64.71 @ 64.71 5996731.93 678635.63 4767.99 @ 64.71 5996763.16 678697.85 4837.62 @ 64.71 5996794.40 678760.07 4907.24 @ 64.71 5996825.64 678822.29 4976.86 @ 64.71 5996856.88 678884.51 5046.49 @ 64.71 5996888.12 678946.73 5116.11 @ 64.71 5996919.36 679008.95 5185.74 @ 64.71 5996950.60 679071.17 5255.36 @ 64.71 5996981.84 679133.39 5324.99 @ 64.71 5997013.08 679195.61 5394.61 @ 64.71 5997044.32 679257.83 5464.23 @ 64.71 5997075.56 679320.05 5533.86 @ 64.71 5997106.81 679382.27 5603.48 @ 64.71 5997138.05 679444.49 5673.11 @ 64.71 5997149.99 679468.27 5699.72 @ 64.71 5997180.81 679529.64 5768.39 @ 64.71 5997210.77 679589.29 5835.14 @ 64.71 5997239.84 679647.17 5899.92 @ 64.71 Vertical DLS Section (ft) (dg/lOOft) 3375.50 0.00 3445.13 0.00 3514.75 0.00 3584.38 0.00 3654.00 0.00 3723.63 0.00 3793.25 0.00 3862.88 0.00 3932.50 0.00 4002.12 0 4071.75 O, 4141.37 0.00 4211.00 0.00 4280.62 0.00 4350.25 0.00 4366.60 0.00 4419.87 0.00 4489.49 0.00 4559.12 0.00 4628.74 0.00 4698.37 0.00 4767.99 0.00 4837.62 0.00 4907.24 0.00 4976.86 5046.49 5116.11 5185.74 0.00 5255.36 0.00 5324.99 0.00 5394.61 0.00 5464.23 0.00 5533.86 0.00 5603.48 0.00 5673.11 0.00 5699.72 0.00 5768.39 1.50 5835.14 1.50 5899.92 1.50 10479.98 38.13 64.71 8225.57 8175.57 2547.14 N 5391.26 E 70.23.52.3197 N 148.32.15.0436 W 5997268.00 679703.26 5962.69 @ 64.71 5962.69 1.50 Smith International, Inc. Proposal Report Page 4 Date: 12/21/92 Weltpath ID: PI-O4/HTPW2 Measured ]nc[ Drift TVD Depth Dir, (ft) (deg.) (deg,) (ft) K-lO  10510.93 37.66 10579,98 36,63 10679.98 35,13 STUMP ISLAND 10745.53 34,14 10779,98 33,63 10879.98 32,13 10979,98 30.63 TARGET/KUPARUK 11021.74 30,00 11121.74 30,00 11221.74 30.00 11321.74 30,00 11421.74 30,00 11521.74 30.00 MILUVEACH 11524.03 30.00 11535,58 30.00 Subsea Depth (ft) 64.71 8250,00 8200,00 64,71 8305,04 8255,04 64,71 8386,06 8336,06 64,71 8440,00 64,71 8468,60 64,71 8552,58 64,71 8637,95 64,71 8674.00 64,71 8760,60 64,71 8847.21 64,71 8933.81 64,71 9020,41 64.71 9107,01 64,71 9109.00 64.71 9119.00 TOTAL Rectangular Offsets (ft) (ft) 2555,26 N 5408,45 E 2573,07 N 5446,15 E 2598,11 N 5499,13 E Geographic Coordinates Latitude / Longitude 70,23,52,3995 N 148.32,14,5400 70,23,52,5747 N 148,32,13,4358 70.23,52,8209 N 148,32,11,8836 8390,00 2614,02 N 5532,82 E 70,23,52,9774 N 148.32.10.8968 8418,60 2622,23 N 5550,18 E 70,23.53.0581 N 148.32.10.3882 8502,58 2645,41 N 5599,26 E 70.23,53,2862 N 148.32.08.9504 8587.95 2667,66 N 5646,34 E 70,23,53,5049 N 148,32.07.5714 8624,00 2676.66 N ~ 5665,39 E 70,23.53.5935 N 148,32.07.0132 8710,60 2698,02 N 5710.60 E 70,23,53.8035 N 148,32.05.6889 8797,21 2719,38 N 5755,81 E 70,23,54.0136 N 148,32,04.3645 8883,81 2740,74 N 5801,02 E 70,23,54,2237 N 148,32.03,0402 8970,41 2762,09 N 5846,23 E 70.23,54.4337 N 148,32,01,7158 9057,01 2783,45 N 5891,43 E 70,23,54,6438 N 148,32,00,3914 9059,00 2783,94 N 5892,47 E 70.23,54,6486 N 148,32,00,3611 9069,00 2786.41 N 5897,69 E 70,23,54.6729 N 148.32,00.2081 11536.73 30,00 64,71 9120.00 9070.00 TOTAL DEPTH 11636,73 30.00 64.71 9206,60 9156.60 2786.66 N 5898,21 E 2808,02 N 5943,42 E 70.23,54,6753 N 148.32,00,1928 70.23.54,8854 N 148.31.58,8685 GRID Coordinates Closure Northing Easting Dist, Dir. (fl) (ft) (ft) deg. 5997276,54 679720,25 5981,70 @ 64,71 5997295,25 679757,50 6023,39 @ 64,71 5997321.55 679809,87 6081,99 @ 64,71 5997338,27 679843,16 6119,25 @ 64,71 5997346,89 679860.32 6138,45 @ 64,71 5997371,25 679908,83 6192,73 @ 64,71 5997394.61 679955,35 6244,80 @ 64,71 5997404,07 679974,19 6265,87 @ 64,71 5997426.51 680018,87 6315,87 @ 64,71 5997448.96 5997471.40 5997493.84 680063,54 6365,87 @ 64,71 680108.22 6415,87 @ 64,71 680152,90 6465,87 @ 64,71 5997516,28 680197,58 6515,87 @ 64,71 5997516.79 680198,61 6517.02 @ 64,71 5997519.39 680203,77 6522,79 @ 64,71 5997519.65 680204,28 6523,37 @ 64,71 5997542.09 680248,96 6573.37 @ 64.71 Vertical DLS Section (ft) (dg/lOOft) 5981,70 1,50 6023,39 1,50 6081,99 1,50 6119,25 1,50 6138,45 1,50 6192.73 1,50 6244,80 "~ ~'~ ,/ 6265,87 1 '~, 6315,87 O. .~ 6365,87 0,00 6415.87 0.00 6465,87 0,00 6515,87 0,00 6517,02 0.00 6522,79 0,00 6523.37 0,00 6573,37 0,00 ,PR 2 0 Alaska OJJ & Gas Cons. Commission Anchorage Smith International, Inc. Travelling Cylinder Rep°rt Computed by the S# Win-CADDS System Horizontal Slice Method Page 1 Date: 12/21/92 REFERENCE WELL: Prudhoe Bay Drifting Point McIntyre P1-O4/H7 TVD, N/S and E/W are measured from the WELLHEAD Wellpath Slot Distance Pl-1/pm7 PI-1/PM7 166.28 P1-11GCT P1-11 101.49 P1-12/pm11 P1-12/PM11 118.43 P1-14/G6WP1 P1-14/G6 149.36 P1-2/l:~a3 P1-2/PM3 51.69 P1-2OGCT P1-20 239.70 P1-25/pm12 P1-25/PM12 315.02 P1-3/p~a4 P1-3/PM4 15.32 P1-7 P1-7/PM8 44.66 P1-G1MWD P1-G1 324.20 P2-3OGCT P2-30 6495.20 P2-49GCT P2-49 4558.00 P2-5OGCT P2-50 7322.55 P2-51GCT P2-51 6603.59 P2-55GCT P2-55 4929.81 P2-57/pm10 P2-57/PM10 3159.10 P2-58/l:~a6 P2-58/PM6 6866.86 P2-59/PM9 P2-59/PM9 7670.61 P2-60/pm13 P2-60/PM13 5063.16 pm1 PM1 55.13 ~ PM2 55.13 P2-48M~D P2-48 7335.32 Closest Points Direction Ref MD Ref TVD 56.00 1203.98 1200.00 253.29 800.31 800.00 250.54 550.00 550.00 250.96 0.00 0.00 152.82 850.49 850.00 250.86 200.00 200.00 250.94 50.00 50.00 72.00 50.00 50.00 251.20 150.00 150.00 155.08 1615.80 1600.00 81.39 11571.37 9150.00 283.14 27532.54 8250.00 74.39 3985.84 3550.00 37.27 5796.92 4850.00 19.12 5936.23 4950.00 135.31 9210.10 7300.00 31.95 11571.37 9150.00 61.53 2374.32 2300.00 247.71 27532.54 8250.00 152.56 1254.90 1250.00 152.56 1254.90 1250.00 73.84 4055.50 3600.00 HYDRIL 13 5/8"-50007Sl GK ANNULAR BOP LATCHED H~AD 15 5/8'- ~ O,O00PSI HUB BOTTOM CONNECTION HTDRIL 13 5/8"-10,000PS1 MPL RAM BOP HUB CONNECTIONS 1/16'- I O, O00PSI SIDE OUTLETS HYDRIL 15 5/8"- 70, O00PSI bfPL RAM BOP FlUB CONNECTIONS 4 1/16'-10,000PSI SIDE OUTLETS LYNN INTERNA770NAL HCR HCR 3 1/16"- 1 O, O00PSI ~ZANUAL lZANU~ CHECK VALVE CHOKE WING . KILl_ WING TYPE E (;A~ VALVE TYPE E GATE VALVE 3 IO, O00PSI ~~ IvfPLRA~BOPHUBCONNECTIONS 4 1/16"-10,000PSI SlOE OUTLETS ~ $ 5/8"-10, O00PSl -' HUB X FLANGE AJask~ Oil & Gas Coi~s. .Anchorage BLOW-OUT PREVENTER STACK PM RIG 7 ,'~-'oRUDHOE BAY DRILLING 'CUP 20" DIVEFITER SCHEMA, ,C POOL 7 , FILL UP LINE . FLOWLINE 20" 2000 PSI DIVERTER ' I 10" BALL VALVE ! CONDUCTOR I 10" BALL VALVE NOTE: ONLY ONE VALVE OPENS AUTOMATICALLY WHEN THE DIVERTER CLOSES. THE SECOND VALVE WILL REMAIN 'CLOSED UNLESS CONDITIONS REQUIRE THE USE OF THE SECOND DIVERTER LINE. THE SECOND VENT Lii",IE CAN BE REMOTELY OPENED TO ACHIEVE DOWNWIHD DIVERSION. THIS IS A VARIANCE FROM 20AAC25.035. RECEIVED APR P: 0 t99~ Alaska Oil & Gas Cons. Anchorage I · 11 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 Porcupine Drive Anchorage Alaska 99501-3192 Re: THE APPLICATION OF ARCO ) ALASKA, INC. for an order ) granting an exception to ) spacing requirements of ) Title 20 AAC 25.055 to provide ) for the drilling of the ARCO Pt. ) Mclntyre Well Nos. Pl-04, Pl-16,) PI-I? and P1-21. ) Conservation Order No. 310 ARCO Alaska Inc. Pt. Mclntyre Well Nos. P1-04, Pl-16, Pl-17 and P1-21 February 5, 1993 IT APPEARING THAT: . ARCO Alaska, Inc. submitted applications dated January 12, 1993, requesting exception to 20 AAC 25.055(a)(3) to allow drilling the ARCO Pt. McIntyre Well Nos. P1-04, Pl-16, Pl-17, and P1-21 closer than 500 feet to a quarter section line. . Notice of hearing was published in the Anchorage Daily News on January 20, 1993 pursuant to 20 AAC 25.540. 3. No substantive protests to the applications were received. .. FINDINGS: . The ARCO Pt. Mclntyre No. P1-04 well as proposed will be directionally drilled from a surface location 1463' from the south line (FSL), 683' from the east line (FEL) of Section 16, T12N, R14E, Umiat Meridian (UM), to a bottom-hole location 1010' from the north ]ine (FNL), 13' FEL of Section 15, T12N, R14E, UM. . The ARCO Pt. Mclntyre No. Pl-16 well as proposed will be directionally drilled from a surface location 1404' FSL, 852' FEL of Section 16, T12N, R14E, UM, to a bottom-hole location 660' FNL, 81' FEL of Section 10, T12N, R14E, UM. . The ARCO Pt. Mclntyre No. Pl-17 well as proposed will be directionally drilled from a surface location 1399' FSL, 866' FEL of Section 16, T12N, R14E, UM, to a bottom-hole location 308' FNL, 1127' from the west line (FWL) of Section 15, T12N, R14E, UM. Conservation Oruer No. 310 February 5, 1993 Page 2 ~ The ARCO Pt. McIntyre No. P1-21 well as proposed will be directionally drilled from a surface location 1379' FSL, 923' FEL of Section 16, T12N, R14E, UM to a bottom-hole location 2468' FSL, 209' FWL of Section 10, T12N, R14E, UM. , Offset operators/owners Exxon Corporation and BP Exploration (Alaska) Inc. have been duly notified. , An exception to 20 AAC 25.055(a)(3) is necessary to allow drilling each of these wells. CONCLUSION: Granting spacing exceptions to allow drilling of the ARCO Pt. McIntyre Well Nos. P1-04, P1-16, Pl-17 and P1-21 as proposed will not result in waste nor jeopardize correlative rights. NOW, THEREFORE, IT IS ORDERED: , ARCO Alaska, Inc.'s applications for exception to 20 AAC 25.055 for the purpose of drilling the Pt. McIntyre Well Nos. P1-04, P1- 16, Pl-17 and P1-21 are approved as proposed. DONE at Anchorage, Alaska and dated February 5, 1993. C Russell A. Douglass, C~ssioner Alaska Oil and Gas Conservation Com~ssion ** CHECK LIST FOR NEW WELL PERMITS ** ITEM APPROVE DATE Fee Loc /¢/~ [2 thru (3) Admin E~]~¢-- [9 thru 13] E~0 $ 13] [14 thru 22] (5) BOPE [23 thru 28] Company ,/~,,,- ~_.~ ~ YES Is permit fee attached ............................................... Lease $ Well ~ '/~,~ 2~;~2_<¢~' /~/.~-- - / NO REMARKS le 2. Is well to be located in a defined pool .............................. 3. Is well located proper distance from property line ................... ~ 4. Is wel 1 located proper distance from other wells ..................... X~ 5. Is sufficient undedicated acreage available in this pool ............. 6. Is well to be deviated & is wellbore plat included ................... ~ 7. Is operator the only affected party ............................... ~.. .A~. 8. Can permit be approved before 15-day wait ............................ ~ . 10. 11. 12. 13. 14. 15. 16. 17. 18. !.9. 20. 21. 22. 23. 24. 25. 26. 27. 28. Does operator have a bond in force ................................... ~, Is a conservation order needed ....................................... , , Is administrative approval needed .................................... Is lease nLrnber appropriate .......................................... ~. Does well have a unique name & ngrnber ................................ /~ Is conductor string provided ......................................... Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. Is enough cement used to circulate on conductor & surface..' .......... Will cement tie in surface g intermediate or production strings ...... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension, and burst. Is well to be kicked off from an existing wellbore ................... Is old wellbore abandonment procedure included on 10-403 ............. Is adequate wel 1 bore separat ion proposed ............................. Is a diverter system required ........................................ Is drilling fluid program schematic g list of equipment adequate ..... Are necessary diagrams & descriptions of diverter & BOPE attached .... Does BOPE have sufficient pressure rating -- test to .5-o~o psig ..... Does choke manifold comply w/API RP-53 (May 84) ...................... Is presence of H2S gas probable ...................................... (6) Other ./¢/~_ ~:,,/~.~ [29 thru (7) Contact [32] geology' enaineerinq' DWJ ~ MTM RAD~..~~ RPC~, BEW ~ '"r~J DH..hL g/.~5 LG --rT' rev 12/92 jo/6.01 I 29. 30. 31. 32. 33. FOR EXPLOPJ~TORY & STRAT I GRAPH I C WELLS: Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Name and phone nLrnber of contact to supply weekly progress data ...... Additional requirements ............................................. Additional INITIAL GEOL UNIT ON/OFF POOL CLASS STATUS AREA .~ SHORE ~-'.--','//' ,) // g M~RID~AN' remarks' UM ~/ SM Exp/Dev / Inj ,TYPE' Redri 1 l~ Rev 0 --t :EZ cn .---I ~'~lm ITl Z Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simp!ify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. off ~~7q O ALASKA INC RECEI AU6 2 3 19g~ & Gas Pi - 04 POINT MCINTYRE ICROFI Run 1' 22 - May - 1993 DLL/CN/ZDUGR 1560 Tape Subfile 2 is type: LIS TAPE HEADERj PRUDHOE BAY UNIT OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: P1 - 04 500292236600 ARCO ALASKA INCORPORATED ATLAS WIRELINE SERVICES 09-JUN-93 RUN1 5960.00 R. ECK E. RAEL RUN2 RUN3 16 12N 14E 1463 683 50.00 9.00 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 10.750 3986.0 9.875 11590.0 DLL/CN/ZDL/GR CIRCULATION STOPPED @ 09:30 22-MAY-93. NEUTRON IS CALIPER CORRECTED. NO CASING CORRECTIONS & CHISM FILTERING NOT ACTIVE. $ FILE HEADER FILE NUMBER: . 1 EDITED OPEN HOLE MAIN PASS All tool strings; depth shifted and clipped curves; hole data. DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR DLL 2435 SDN $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA 0.5000 START DEPTH STOP DEPTH 8285.0 11508.0 8337.0 11560.0 8337.0 11515.0 8310.0 11533.0 GR (MEASURED DEPTH) BASELINE DEPTH LL3 8259.0 8259.0 8349.5 8392.0 8392.5 8392.0 8396.0 8397.0 8438.5 8446.5 8447.0 8457.5 8457.5 8472.5 8472.5 8543.0 8663.5 8708.0 8713.5 8966.5 8967.0 8967.5 8970.0 8970.0 8988.0 8990.5 8991.0 9064.5 9064.5 9068.5 9318.5 9319.0 9522.0 9523.0 9523.0 9720.0 9718.0 9793.5 9793.5 9950.5 9951.0 9965.0 9967.0 10596.5 10597.0 10655.0 10654.5 10699.5 10699.5 10700.0 10737.0 10738.5 10746.0 10746.5 10746.5 10791.0 10791.5 10826.0 lOg57.o 10859.0 10868.0 10892.0 EQUIVALENT UNSHIFTED DEPTH RHOB NPHI 8259.0 8259.0 8349.0 8349.0 8391.5 8391.5 8438.0 8438.0 8472.0 8472.0 8543.0 8543.0 8663.5 8663.5 8708.5 8708.5 8713.0 8713.0 8967.5 8966.5 8988.0 8990.5 8991.5 9068.5 9068.5 9523.0 9522.5 9717.5 9717.5 9966.0 9966.0 10700.0 10700.0 10737.5 10737.5 10745.5 10745.5 10826.0 10826.0 10857.5 10857.5 10859.0 10859.0 10868.0 10868.0 10891.0 10891.0 all runs merged; no case 10899.0 10915.5 10993.5 . 10998.5 11003.5 11025.5 11026.0 11045.0 11049.5 11081.5 11120.0 11284.0 11292.5 11371.0 11407.0 11407.5 11431.5 11445.0 11459.0 11587.0 $ MERGED DATA SOURCE PBU TOOL CODE GR DLL 2435 SDN $ REMARKS: CN WN FN COUN STAT 10899.0 10915.5 10993.5 10899.0 10915.5 10993.5 10998.5 11003.0 11003.0 11025.5 11025.5 11026.0 11045.5 11045.0 11045.0 11050.0 11081.0 11120.0 11283.5 11292.5 11370.0 11406.0 11407.5 11407.5 11431.5 11431.5 11445.0 11445.0 11459.0 11459.0 11587.0 11587.0 11587.0 RUN NO. PASS NO. MERGE TOP 1 2 8285.0 1 2 8337.0 1 2 8337.0 1 2 8310.0 MERGE BASE 11508.0 11560.0 11515.0 11533.0 LLD, SP, TENS, & TEND WERE SHIFTED WITH LL3. FUCT & NUCT WERE SHIFTED WITH NPHI. DRHO, PEF & CALl WERE SHIFTED WITH RHOB. $ : ARCO ALASKA INCORPORATED : P1 - 04 : POINT MCINTYRE : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 13 Curves: Name Tool Code Samples Units Size API API API API Log Crv Crv Length Typ Typ Cls Mod GR DLL 68 1 GAPI LL3 DLL 68 1 OHMM LLD DLL 68 1 OHMM ~p DLL 68 1 MV TEND DLL 68 1 LB TENS DLL 68 1 LB NPHI 2435 68 1 PU-S 4 57 515 01 6 4 30 739 95 0 4 30 739 95 0 4 30 739 95 0 4 30 739 95 0 4 30 739 95 0 4 98 211 23 1 8 FUCT 2435 68 1 CPS 4 9 NUCT 2435 68 1 CPS 4 10 RHOB SDN 68 1 G/C3 4 11 DRHO SDN 68 1 G/C3 4 12 PEF SDN 68 1 BN/E 4 13 CALl SDN 68 1 IN 4 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data'Records: 370 4 98 211 23 4 98 211 23 4 22 779 91 4 22 779 91 4 22 779 91 4 22 779 91 52 Tape File Start Depth = 11587.000000 Tape File End Depth = 8259.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 93199 datums Tape Subfile: 2 510 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 3 is type: LIS TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY FILE HEADER FILE NUMBER: 2 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 for Sadlerochit run presented first (primary depth control string used to depth shift the Sadlerochit interval) followed by files for other main pass tool strings per run. RUN NUMBER: 1 1 2 0.2500 VENDOR TOOL CODE START DEPTH STOP DEPTH GR 8285.0 11532.0 DLL 8337.0 11584.0 2435 8337.0 11538.0 ZDL 8310.0 11555.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): 22-MAY-93 FSYS REV. J001 VER. 1.1 930 22-MAY-93 2035 22-MAY-93 11590.0 11574.0 8340.0 11560.0 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MODL GR CN PCM ZDL KNJT TEMP PCM KNJT MIS DLL FTS FTS $ CABLEHEAD TENSION MODAL SUB GAMMA RAY COMPENSATED NEUTRON PULSE CODE MODULATOR Z-DENSITY KNUCKLE JOINT TEMPERATURE PULSE CODE MODULATOR KNUCKLE JOINT MASS ISOLATION SUB DUAL LATEROLOG FEED THROUGH SUB FEED THROUGH SUB TOOL NUMBER 3974XA 3517NA 1309XA 2435XA 3508XA 2222EA/2222MA 3921NA 2806XA 3506XA 3921NA 3967NA 1229EA/1229MA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 9.875 3986.0 0.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): KCL/POLYMER 10.20 MUD VISCOSITY (S): MUD PH: FLUID ~LOSS~ (C3) : MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: MAIN PASS. NEUTRON IS CALIPER CORRECTED. $ CN WN FN COUN STAT : ARCO ALASKA INCORPORATED : P1 - 04 : POINT MCINTYRE : NORTH SLOPE : ALASKA 56.0 9.6 10.6 161.0 0.234 0.109 0.195 0.000 0.292 0.000 THERMAL SANDSTONE 2.65 0.000 0.0 75.0 161.0 63.0 0.0 58.0 0.0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 17 Curves: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 16 17 Name Tool Code Samples Units GR DLL 68 1 GAPI RS DLL 68 1 OHMM RD DLL 68 1 OHMM SP DLL 68 1 MV CHT DLL 68 1 LB TTEN DLL 68 1 LB SPD DLL 68 1 F/MN CNC 2435 68 1 PU-S CNCF 2435 68 1 PU-S CN 2435 68 1 PU-L LSN 2435 68 1 CPS SSN 2435 68 1 CPS ZDEN ZDL 68 1 G/C3 PORZ ZDL 68 1 PU-S z¢oR SDL 68 1 G/C3 PE ZDL 68 1 BN/E CAL ZDL 68 1 IN API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 57 515 01 6 4 40 514 81 0 4 39 859 45 0 4 23 415 80 5 4 46 103 82 1 4 46 103 82 1 4 11 639 82 1 4 98 211 23 1 4 98 211 23 1 4 52 326 75 5 4 84 023 70 1 4 83 368 34 1 4 52 443 33 1 4 46 370 25 1 4 09 884 61 1 4 76 731 33 1 4 24 115 90 6 * DATA R,ECORD (TYPE# 0) 1014 BYTES * Total Data Records: 951 68 Tape File Start Depth = 11587.000000 Tape File End Depth = 8259.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 239635 datums Tape Subfile: 3 1036 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY 1 1 1 0.2500 VENDOR TOOL CODE START DEPTH GR 10447.0 DLL 10500.0 2435 10500.0 ZDL 10472.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): STOP DEPTH 11532.0 11584.0 11538.0 11556.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MODL GR CN PCM ZDL KNJT TEMP PCM KNJT MIS DLL FTS FTS $ CABLEHEAD TENSION MODAL SUB GAMMA RAY COMPENSATED NEUTRON PULSE CODE MODULATOR Z-DENSITY KNUCKLE JOINT TEMPERATURE PULSE CODE MODULATOR KNUCKLE JOINT MASS ISOLATION SUB DUAL LATEROLOG FEED THROUGH SUB FEED THROUGH SUB BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS ~g3D TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: 22-MAY-93 FSYS REV. J001 VER. 1.1 930 22-MAY-93 1946 22-MAY-93 11590.0 11574.0 8340.0 11560.0 1800.0 TOOL NUMBER 3974XA 3517NA 1309XA 2435XA 3508XA 2222EA/2222MA 3921NA 2806XA 3506XA 3921NA 3967NA 1229EA/1229MA 9.875 3986.0 0.0 KCL/POLYMER 10.20 56.0 9.6 FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: REPEAT PASS. NEUTRON IS CALIPER CORRECTED. CN WN FN COUN STAT : ARCO ALASKA INCORPORATED : P1 - 04 : POINT MCINTYRE : NORTH SLOPE : ALASKA 10.6 161.0 0.234 0.109 0.195 0.000 0.292 0.000 75.0 161.0 63.0 0.0 58.0 0.0 THERMAL SANDSTONE 2.65 0.000 0.0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 17 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 GR DLL 68 1 GAPI RS DLL 68 1 OHMM RD DLL 68 1 OHMM SP DLL 68 1 MV CHT DLL 68 1 LB TTEN DLL 68 1 LB SPD DLL 68 1 F/MN CNC 2435 68 1 PU-S CNCF 2435 68 1 PU-S CN 2435 68 1 PU-L LSN 2435 68 1 CPS SSN 2435 68 1 CPS ZDEN ZDL 68 1 G/C3 PORZ ZDL 68 1 PU-S ZCOR ZDL 68 1 G/C3 PE ZDL 68 1 BN/E CAL ~DL 68 1 IN 4 4 57 515 01 6 4 4 40 514 81 0 4 4 39 859 45 0 4 4 23 415 80 5 4 4 46 103 82 1 4 4 46 103 82 1 4 4 11 639 82 1 4 4 98 211 23 1 4 4 98 211 23 1 4 4 52 326 75 5 4 4 84 023 70 1 4 4 83 368 34 1 4 4 52 443 33 1 4 4 46 370 25 1 4 4 09 884 61 1 4 4 76 731 33 1 4 4 24 115 90 6 68 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data-Records: 334 Tape File Start Depth = 11587.000000 Tape File End Depth = 10419.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 177314 datums Tape Subfile: 4 417 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: LIS 93 / 6/ 9 01 **** REEL TRAILER **** 93/ 6/11 01 Tape Subfile: 5 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Fri 11 JUN 93 8:41a Elapsed execution time = 1 minute , 26.6 seconds. SYSTEM RETURN CODE = 0