Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout193-0877. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU P1-05
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
193-087
50-029-22378-00-00
13828
Conductor
Surface
Intermediate
Production
Liner
9217
79
4196
13767
13200
20"
10-3/4"
7-5/8"
8862
41 - 120
40 - 4236
37 - 13804
41 - 120
40 - 3567
37 - 9203
470
2480
4790
1490
5210
6890
13056 - 13108
4-1/2" 12.6# 13cr80
8774 - 9074
Structural
4-1/2" Baker S3 , 12630 , 8513
12630 , 12812
8513 , 8621
Bo York
Operations Manager
Eric Dickerman
Eric.Dickerman@hilcorp.com
(907) 564-5258
PRUDHOE BAY, PT MCINTYRE OIL
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0034624
213
155
14498
11154
3922
3585
1802
1806
1628
1321
N/A
13b. Pools active after work:PT MCINTYRE OIL
4-1/2" Baker SABL-3 , 12812 , 8621
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
35 - 12696 , 12790 - 12876 35 - 8552 , 8607 - 8660
No SSSV
13200
13561
By Grace Christianson at 10:25 am, Mar 28, 2024
Digitally signed by Bo York
(1248)
DN: cn=Bo York (1248)
Date: 2024.03.27 16:45:06 -
08'00'
Bo York
(1248)
DSR-4/12/24
RBDMS JSB 040424
WCB 7-1-2024
ACTIVITYDATE SUMMARY
10/30/2023
***WELL S/I ON ARRIVAL***
RAN LIB TO TOP OF IBP @ 12875' SLM ( impression of ibp fishneck)
RAN 3'' IBP EQ SLEEVE, 2-1/2'' RS TO 12875' SLM UNABLE TO EQ AND LATCH
MADE 2 ATTEMPS TO EQ w/ 3" EQ SLEEVE, UNABLE TO EQ
RAN 3.60 BELL GUIDE, 2.60 BELL GUIDE w/ TT PINS (cont on next day)
***WSR CONT ON 10/31***
10/31/2023
***WSR CONT FROM 10/30***
RAN 3.60 BELL GUIDE, 2.60 BELL GUIDE w/ TT PINS TP TOP OF IBP @ 12875'
SLM, UNABLE TO EQ, TT PINS NOT SHEARED
RAN KJ, 2' 1-7/8", 3.68'' CENT, 3.60 BELL GUIDE, 2.60 BELL GUIDE w/ TT PINS
TO 12875' SLM (unsuccessful)
RAN 3.65'' DE-CENT, 3.50'' LIB, S/D @ 12875'SLM (impression of ibp fishing neck)
RAN 3-1/2'' GR, 3-1/2'' B-SUB, 2-1/2'' RS, S/D @ 12875'SLM (pulled ibp fish neck &
rod)
RAN KJ, SWIVEL, 3.65'' DE-CENT, 3.50'' LIB, S/D @ 12877'SLM (impression of
doughnut next to parted ibp)
RAN 3.5'' CENT, 3'x1-7/8'', 3.5'' CENT, 1-1/2'' POCKET BRUSH TO12879'SLM
(attempted to pull doughnut, unsuccessful)
RAN 3-1/2'' GR, 3-1/2'' B-SUB, 3.50'' CENT, 3'x1-7/8'', 3.50'' CENT, 2.70'' WFD
RELEASABLE SPEAR (recovered doughnut)
RAN 3-1/2'' GR, 3-1/2'' BAIT SUB, 2.25'' BDK RELEASEABLE OVERSHOT (1.00'' to
1.13'' grapples) (cont on next day)
***WSR CONT 11-01-23***
10/31/2023
(Assist Slickline) TFS U-3, SB for SL
***Job Continued on 11-1-23***
11/1/2023
***WSR CONRT FROM 10-31-23***
RAN 3-1/2'' GR, 3-1/2'' BAIT SUB, 2.25'' BDK RELEASEABLE OVERSHOT (1.00'' to
1.13'' grapples), S/D @ 12876' SLM (multiple friction bites)
RAN 3-1/2'' GR, 3-1/2'' BAIT SUB, 3.60'' BELL GUIDE, 2.60'' BELL GUIDE, 2'' JD
(gutted) GRAB PARTED IBP @ 12785' SLM ( jar heavy for 10min, unsuccessful)
RAN 3' x 1-7/8'' STEM, 3.67'' BLIND BOX, T-BIRD ON LINE TO LOAD WELL, GET
P/U WEIGHT @ ~12620' SLM OF 1900# (dragging heavy thur scale, abort run)
RAN 3'x1-7/8'', 3.50'' BLIND BOX TO @ 12870'SLM, JAR DOWN 1 HR w/ T-BIRD
PUMPING & MAKE IT TO 12890'SLM
T-BIRD COME PUMPED ~5 BPM FOR 20 BBLS TO SEE IF IT WILL PUSH IBP
DOWN HOLE. PRESSURE NEVER CAME ABOVE 1000 PSI
RAN 3' x 1-7/8" STEM, 3.50" BLIND BOX, TAG PARTED IBP @ 12886' SLM, T-
BIRD PUMPED ~1 UP TO ~5 BPM WHILE BEATING DOWN FOR 120 BBLS
TOTAL, NO MOVEMENT
BRUSHED w/ 2' 1-7/8'' STEM, 3.80'' G-RING, 2' x 1-7/8'' STEM, 4-1/2'' BLB,
B.NOSE X-NIP @ 12608' SLM / 12609' MD, CRIH TO 12632' SLM, UNABLE TO
WORK PASSED
***WSR CONT ON 11-2-23***
Daily Report of Well Operations
PBU P1-05
Daily Report of Well Operations
PBU P1-05
11/1/2023
***Job Continued from 10-31-23***
(Assist Slickline) TFS U-3, Pumped 2 bbls 60/40 and 454 bbls crude assisting SL.
FWHP= 0/1050/0 SL still on well upon deqparture.
11/2/2023
***WSR CONT FROM 11-1-23***
ATTEMPTED TO SET 3.813 X-LOCK (secdary lock down,lih 33'') NS IBP STOP @
12609' MD (poss scale issues)
SET 3.813 X-LOCK (secdary lock down,lih 33'') NS IBP STOP IN SSSV NIP @ 2301'
MD
RAN 4-1/2'' CHECK SET TO IBP STOP SET @ 2301' MD (sheared)
***JOB COMPLETE, WELL LEFT S/I***
11/26/2023
***ARRIVE ON AND INSPECT LOCATION WELL SHUT IN*** (fish ibp)
DRIFT & PULL IBP STOP FROM 2,301' MD
RAN MULT LIB. S/D @ 10,037' SLM. NO IMPRESSION
***CONT WSR ON 11/27/2023***
11/27/2023
***CONT WSR FROM 11/27/23*** (fish ibp)
RAN LIB TAGGED IBP @ 12,943'SLM
LATCHED IBP W/ OVERSHOT (ddk202) @ 12,943' SLM
***CONT WSR ON 11/28/23***
11/28/2023
***CONT WSR FROM 11/27/2023***
CUT WIRE BAD TEST 2,500' .125" CARBON SWAP TO .125" STAINLESS.
RECOVERED & RESET OVERSHOT FISH (14'8" lih) @ 12,945' SLM.
***CONT WSR ON 11/29/23***
11/29/2023
***CONT WSR FROM 11/28/23***
JAR ON OVERSHOT IBP FISH @ 12,930' SLM
RIGDOWN
***DEPART LOCATION***
1/1/2024
***WELL S/I IN ON ARRIVAL***
R/U POLLARD #61
PERFORMED MAN DOWN DRILL w/ CREW
JOB CANCELED DUE BAD WEATHER POSSIBLY COMING
***WELL LEFT S/I IN ON DEPARTURE, DSO NOTIFIED OF WELL STATUS***
1/8/2024
***WELL S/I ON ARRIVAL***
RAN 4-1/2" GR TO IBP @ 12,975' SLM, BEAT 20 MINS, MOVE IBP UP TO 12,865'
SLM (est. TTL)
***WSR CONT. ON 01-08-2024***
1/8/2024
T/I/O= 1400/1100/0 Assist Slickline ( Load Tbg ) Pump 2 bbls 60/40 & 275 bbls
crude down tbg to load. FWHPs=0/1200/0
1/9/2024
***CONT. FROM 01-08-2024***
WORK IBP BETWEEN 12,836' SLM(xn-nip) TO 13,020' SLM, UNABLE TO WORK
DEEPER
***CONT. ON 01-10-2024***
1/10/2024
***CONT. FROM 01-09-2024***
RAN 4-1/2" GR LEFT IBP IN TUBING TAIL @12,846'SLM
***WELL S/I ON DEPARTURE***
Daily Report of Well Operations
PBU P1-05
2/27/2024
LRS CTU #2 1.75" CT 0.156" Wall - Job Scope: Fish IBP / Cement Squeeze
MIRU CTU. RIH w/ Baker 4" G-Spear Fishing BHA. See no bobbles at Tbg Tail
area. Continue RIH pushing IBP Fish. Tag at 13533'. (Previous Tag before IBP was
set was at 13515' slm). Pick up and tag shallower at 12523'. Pump down Coil to
release from SL bait sub if were latched up. Pooh. Bullhead 252 bbls 2% KCL w/
Safelube down backside. 0psi Whp with full water column. Break down fishing tools.
RIH w/ HES 2-7/8" Logging Carrier & 3.60" Nozzle. Tag IBP fish at 13525' ctm. Log
from compression up to 12500'. Flagged Pipe at 12465'. Pooh. Break down logging
tools and confirm good data. +7' correction. Make up cementing BHA w/ 1.75"
BDJSN and RIH. L&K well w/ 2% KCL down backside.
***In Progress***
2/28/2024
LRS CTU #2 1.75" CT 0.156" Wall - Job Scope: Fish IBP / Cement Squeeze
Continue RIH w/ 1.75" Cement Nozzle. Bullhead 235 bbls 2% KCL and 175 bbls
Diesel to underbalance well. Reciprocate across lower perfs pumping 2% KCL down
Coil. Pump 5 bbls FW, 16.5 bbls 15.8ppg Class G Cement, 5 bbls FW. Displace
with Meth & Diesel. Park Coil at 13525' (~ 5' above IBP Fish, bottom of IBP Fish at ~
13561'). Let 4 bbls Cmt around Coil. Lay in maintaining 1:1 returns. Once FW
behind Cmt reached nozzle, close choke & pooh pumping pipe displacement (0.3bpm
pulling 100fpm). TOC @ ~ 13200'. At surface, pump Gel Sweep thru Coil out to
tanks. Freeze Protect Coil w/ Diesel. Tbg Freeze Protected w/ Diesel. Rig Down
CTU.
***Job Complete***
3/4/2024
***WELL S/I ON ARRIVAL***
DRIFTED WITH 3.70" CENT, 3.00" SAMPLE BAILER DOWN TO 13,142'
SLM(recovered ~1 cup of cement & coil shavings)
***WELL LEFT S/I ON DEPARTURE, DSO NOTIFIED OF WELL STATUS***
3/19/2024
T/I/O = 1480/1500/0+. Temp = 112°. Bleed IAP to 500 psi (Eval TxIA comm). AL SI
@ LV, no companion valve. OA cemented to surface. IA FL @ 4363' (Sta #4, SO).
Bled IAP to OT to 490 psi in 35 min. IA FL unchanged. TP decreased 30 psi.
Monitored for 30 min. IAP & IA FL unchanged. Final WHPs = 1450/490/0+.
SV = C. WV, SSV, MV = O. IA, OA = OTG. 13:30
g
Pump 5 bbls FW, 16.5 bbls 15.8ppg Class G Cement, 5 bbls FW. Displace g
with Meth & Diesel. Park Coil at 13525' (~ 5' above IBP Fish, bottom of IBP Fish at ~(
13561'). Let 4 bbls Cmt around Coil. Lay in maintaining 1:1 returns. Once FW)yg
behind Cmt reached nozzle, close choke &pooh pumping pipe displacement (0.3bpm
pulling 100fpm). TOC @ ~ 13200'.
gg
Continue RIH pushing IBP Fish. Tag at 13533'. (Previous Tag before IBP was gg(g
set was at 13515' slm). Pick up and tag shallower at 12523'. Pump down Coil to )g
release from SL bait sub if were latched up. Pooh. Bullhead 252 bbls 2% KCL w/
Safelube down backside. 0psi Whp with full water column. Break down fishing tools. g
RIH w/ HES 2-7/8" Logging Carrier & 3.60" Nozzle. Tag IBP fish at 13525' ctm. Loggg g gg
from compression up to 12500'. Flagged Pipe at 12465'. Pooh. Break down logging tgg
tools and confirm good data. +7' correction. Make up cementing BHA
By Samantha Carlisle at 7:58 am, Aug 17, 2022
7. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071):10. Field/Pool(s):
Abandon
Suspend
Plug for Redrill Perforate New Pool
Perforate
Plug Perforations
Re-enter Susp Well
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU P1-05
Pull IBP
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
193-087
50-029-22378-00-00
13828
Conductor
Surface
Intermediate
Production
Liner
9217
79
4196
13767
13725
20"
10-3/4"
7-5/8"
9160
41 - 120
40 - 4236
37 - 13804
41 - 120
40 - 3567
37 - 9203
None
470
2480
4790
None
1490
5210
6890
13056 - 13572
4-1/2" 12.6# 13cr80
8774 - 9074
Structural
4-1/2" Baker S3 Packer 12630, 8513
Bo York
Sr. Area Operations Manager
Kirsty Glasheen
Kirsty.Glasheen@hilcorp.com
907.564.5258
PRUDHOE BAY, PT MCINTYRE OIL
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV (type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final
13.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0034624
4-1/2" Baker SABL-3 12812, 8621
N/A
N/A
572
180
30447
8630
1349
5518
2117
1897
1989
1330
N/A
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2021 Submit Within 30 days or Operations
Sr Res Eng:
12630, 12812
8513, 8621
35 - 12696, 12790 - 12876 35 - 8552, 8607 - 8660
By Samantha Carlisle at 9:15 am, Nov 09, 2021
Digitally signed by Bo York
DN: cn=Bo York, c=US, o=HIlcorp
Alaska LLC, ou=Alaska North
Slope, email=byork@hilcorp.com
Date: 2021.11.09 07:11:58 -09'00'
Bo York
DSR-11/10/21
, ADL0028297
RBDMS HEW 11/10/2021
SFD 11/15/2021
SFD 11/15/2021MGR27DEC2021
ACTIVITY DATE SUMMARY
10/18/2021
***WELL FLOWING ON ARRIVAL*** (profile modification)
DRIFT TBG TO IBP @ 13247' MD w/ BOWSPRING CENT & 3.5" LIB (good pic of fn)
PULLED 3-3/8 BAKER IBP @ 13247' MD FREE, JD SHEARED LEAVING IBP IN
TBG @ 12630' SLM
***IN PROGRESS, JOB CONT. ON 10/19/21***
10/19/2021
***JOB CONT. FROM 10/18/21***
PULLED 3-3/8" BAKER IBP LEFT IN TBG @ 12360' SLM
UNABLE TO GET IBP OUT OF 10' RISER, RISER TAKEN TO BAKER SHOP TO
HAVE IBP EXTRACTED TO VERIFY ELEMENTS RECOVERED
***IN PROGRESS, JOB CONT. ON 10/20/21 IF NECCESSARY***
10/20/2021
***CONTINUED FROM 10/19/21 WSR*** (Profile modification)
RAN MULTIPLE CONFIGURATIONS OF WIRE GRAB, BRUSH, & CENTS IN
ATTEMPT TO FISH IBP ELEMENTS.
DRIFT TUBING & TAG TD AT 13,533' SLM W/ 4-1/2" BRUSH, 3.50" WIRE GRAB
(Scale on brush).
***WELL S/I ON DEPARTURE, NOTIFIED PAD OPERATOR OF WELL STATUS***
NOTE: TWO 6" SEALING ELEMENTS LEFT IN HOLE FROM BAKER IBP PULLED
10/19/21.
Daily Report of Well Operations
PBU P1-05
Date: 5/28/2020
Transmittal Number: 93762
BPXA WELL DATA TRANSMITTAL
Subsurface Information Management
900 E. Benson Blvd. PO Box 196612
Anchorage, AK 99519-6612
The digital zip file for the well log package listed below is being provided to you via SharePoint.
If you have any questions please contact Merion Kendall: 907-564-5216; merion.kendall@bp.com.
SW Name Log Date Company Description Format
P1-05 4/20/2020 Schlumberger Production Profile Zip File
Please Sign and Return one copy of this transmittal to GANCPDC@bp365.onmicrosoft.com
Thank you,
Mer
Merion Kendall
SIM Specialist
-----------------------------------------------------------------------------------------------
BP Exploration Alaska|900 E. Benson Blvd.|Room: 716B|Anchorage, AK
-----------------------------------------------------------------------------------------------
AOGCC https://bp365.sharepoint.com/sites/BPtoAOGCCElectronicPermittingandReporting/
PTD: 1930870
E-Set: 33269
Received by the AOGCC on 05/28/2020
Signed for by Abby Bell on 05/28/2020
• STATE OF ALASKA • RECEIVED
ALASKA OIL AND GAS CONSERVATION COMMISSION
AUG 2 4 2012
REPORT OF SUNDRY WELL, OPERATIONS
1. Operations Abandon 11 Repair Well u Plug Perforations t Perforate U AGQCCSet Plug
Performed: Alter Casing ❑ Pull Tubing❑ Stimulate - Frac ❑ Waiver ❑ Time Extension❑
Change Approved Program ❑ Operat. Shutdown Stimulate - Other ❑ Re -enter Suspended WeIL
2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: „"
Name: BP Exploration (Alaska), Inc Development El Exploratory ❑ 193 -087 -0
3. Address: P.O. Box 196612 Stratigraphic❑ Service ❑ 6. API Number: P
Anchorage, AK 99519 -6612 50- 029 - 22378 -00 -00
7. Property Designation (Lease Number): 8. Well Name and Number:
ADL0034624 P1 -05
9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s): _
None PRUDHOE BAY, PT MCINTYRE OIL
11. Present Well Condition Summary:
Total Depth measured 13828 feet Plugs measured None feet
true vertical 9218 feet Junk measured None feet
Effective Depth measured 3528 feet Packer measured See Attachment feet
true vertical 3138.84 feet true vertical See Attachment feet
Casing Length Size MD TVD Burst Collapse
Structural None None None None None None
Conductor 80 20" 91.5# H -40 39 - 119 39 - 119 1490 470
Surface 4198 10 -3/4" 45.5# NT -80 38 - 4236 38 - 3567.28 4560 1730
Intermediate None None None None None None
Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment
Liner None None None None None None
Perforation depth Measured depth 13056 - 13236 feet 13272 - 13572 feet
True Vertical depth 8773.73 - 8883.16 feet 8904.38 - 9073.87 feet
Tubing (size, grade, measured and true vertical depth) See Attachment See Attachment See Attachment
Packers and SSSV (type, measured and true vertical depth) See Attachment See Attachment See Attachment Packer
None None None SSSV
12. Stimulation or cement squeeze summary:
Intervals treated (measured): SCANNED LIAR 0 4 2013
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation: 484 24797 5420 2081 1693
Subsequent to operation: 83 3834 4694 1876 1097
•
14. Attachments: 15. Well Class after work:
Copies of Logs and Surveys Run Exploratory❑ Development 0 ✓ Service ❑ Stratigraphic ❑
Daily Report of Well Operations X 16. Well Status after work: Oil r 5 Gas ❑ WDSPLU
GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUcf
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
N/A
Contact Garry Catron Prepared by Garry Catron 564 -4424
Printed Name Garry Catron Title PDC PE
Signature f J C O:7 v Phone 564 -4424 Date 8/24/2012
R!DMS AUG 8 1012 v`' 1 ,�, / 17
Form 10 -404 Revised 10/2010 Submit Original Only
• •
Packers and SSV's Attachment
ADL0034624
SW Name Type MD TVD Depscription
P1 -05 PACKER 12664 8483.02 4 -1/2" Baker S -3 Perm Packer
P1 -05 PACKER 12808 8568.66 4 -1/2" Baker SABL -3 Packer
I
Casing / Tubing Attachment
ADL0034624
Casing Length Size MD TVD Burst Collapse
CONDUCTOR 80 20" 91.5# H -40 39 - 119 39 - 119 1490 470
PRODUCTION 2698 7 -5/8" 29.7# L -80 37 - 2735 37 - 2599.66 6890 4790
PRODUCTION 2698 7 -5/8" 29.7# L -80 37 - 2735 37 - 2599.66 6890 4790
PRODUCTION 9765 7 -5/8" 29.7# L -80 2735 - 12500 2599.66 - 8435.28 6890 4790
PRODUCTION 1325 7 -5/8" 29.7# 13CR95 12500 - 13825 8435.28 - 9215.02 8180 5120
SURFACE 4198 10 -3/4" 45.5# NT -80 38 - 4236 38 - 3567.28 4560 1730
TUBING 12696 4 -1/2" 12.6# L -80 35 - 12731 35 - 8572.19 8430 7500 •
TUBING 86 4 -1/2" 12.6# 13Cr80 12790 - 12876 8607.45 - 8660.18 8430 7500
•
! •
Daily Report of Well Operations
ADL0034624
ACTIVITYDATE SUMMARY
***WELL SHUT -IN ON ARRIVAL * ** (SLB E -LINE X -FLOW CHECK, THEN SET
IBP)
INITIAL T /I /O = 2050/2300/0 PSI
RAN STP TO LOOK FOR CROSSFLOW AT IBP SET DEPTH. FOUND UP FLOW
OF 1.2 BPM, NOTIFIED APE AND BAKER OF X -FLOW, BAKER PREPPING X-
FLOW IBP FOR TOMORROW MORNING. TAGGED TD AT 13565' DEPTH
CORRECTED TO WELL SKETCH ELM MEASURED TUBING TAIL OF 12886'.
6/20/2012 ** *CONTINUE JOB NEXT DAY * **
* ** JOB CONTINUED FROM 20- JUNE -2012 * ** (E -LINE: IBP)
INITIAL T /I /O = 2300/2300/0
RIH WITH BAKER 3 -3/8" IBP. SET IBP MID - ELEMENT AT 13256'. CCL STOP
DEPTH = 13230.7'. TOP OF PLUG = 13246.9'
BAKER IBP: 1840# DOWN TO EQUALIZE. 5500# UP TO RELEASE. OVERALL
PLUG LENGTH = 13.41'. 1.75" FISHING NECK.
WELL SHUT IN ON DEPARTURE. FINAL T /I /O = 2300/2300/0
* ** JOB COMPLETE ON 21- JUNE -2012 * **
6/21/2012
. !
TREE = FMC SAFETY NOTES: ***COMPOSITE WRAP REPAIRSH LEAK -
WELLHEAD = FMC p 1 0 5 DO NOT MIT -OA OVER 1200 PSI DUE TO DESIGNED
ACTUATOR = BAKER C PRESSURE RATING OF REPAIR & DO NOT PUMP METH 1
KB. ELEV = 50' METH BLEND INTO OA DUE TO CHEM! INCOMPATIBILITY
BF. ELEV = 1 i wIEPDXY RESIN'"' 4- 112" CHRDM E TBG & 7 -5/8"
KOP = 1332' 11 CHROMECSG. TBG HGR: FMC GEN BPX @ 35' MD.
Max Angle = 57° @ 11729' 1 4 1
Datum MD = 13180'
rei A I 2301' -- 1 4-1/2" HES HXO SSSV, 0 = 3.813"
Datum TVD = 8800' SS 0 I 2711' H 7 -5/8" ES CEMENTER I
17 -5/8" CSG, 29.7 #, L -80, ID = 6.875" H 2736' I ,
W
3736' HEST TOP OF CEMENT (08/22/03)
14
1 10 -314" CSG, 45.5 #, NT -80, ID = 9.953' 1-{ 4236'
6 GAS LIFT MANDRELS
ST MD TVD DEV TYPE VLV LATCH FORT DATE
4 4363 3644 53 KBG -2 SO BK 24 07/23/09
_d 3 7466 5482 55 KBG -2 DMY BK 0 07/02/09
2 10041 7018 53 KBG -2 DMY BK 0 03/17/05
1 12582 8485 54 KBG -2 DMY BK 0 03/17/05
7 -5/8" CSG, 29.7 #, L -80, ID = 6.875" H 12499' J
I I I 12609' 1-14-1/2" X NIP, ID = 3.813"
Minimum ID = 3.725" @ 12856'
4 -1/2" PARKER SWN NIPPLE S g —. 1 2630' H7 -5/8" X 4 -1/2" BKR S -3 PKR, ID = 3.875"
I I 12663' IH 4 - 1 /2" X NIP, 10= 3.813" I
I I 12674' H 4 - 1/2" X NIP, ID = 3.813" I
12696' H 4 - 1/2" WLEG, ID = 3.958" I
I4 -12" TBG, 12.6#, 13CR, .0152 bpf, ID = 3.958" —I 12696' I —
14-12" TUBING STUB ( 12/15/05) H 12790' ELM 12812' H 7 -5/8" X 4 -1 BKR SABL -3 PKR, ID = 3.88"
I 12839' H 4 -12" PARKER SWS NIP, ID = 3.813" I
12856' I- 14 -12" PARKER SWN NIP, ID = 3.725" I
14 -1/2" TBG, 12.6 #, NT- 13CR -80, .0152 bpf, ID = 3.958" H 12876' r' 12876' -- 41/2' WLEG, ID = 4.0"
12886' H arvo TT LOGGED 08 /12193 I
PERFORATION SUMMARY
REF LOG: CDR ON 07/8/93
ANGLE AT TOP PERF: 51° @ 13056'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn /Sqz DATE \
3-3/8" 6 13056 - 13236 0 09/02/93 \!�
3-3/8" 6 13272 - 13572 C 09/02/93 11 3247' ELMD — 13 -3/8" BKR IBP (0621/12)
I PBTD I--I 13724'
• • • 1 • • 1 • • • + • • * • • • • • • • • • • • • • • • 1
7 -5/8" CSG, 29.7 #, L- 80/13- CR -95, H 13804' 1,4 #1.1.1.1....
.0459 bpf , ID = 6.875"
DATE REV BY COMMENTS DATE REV BY COMMENTS POINT MCINTYRE UNIT
07113/93 ORIGINAL COMPLETION 09/13/05 /TLH IBP PILLED (03 /17/05 -DRLG) WELL P1 -05
03/17/05 MRITLH RWO 09/29/09 DTR/SV GLV C/O (07/23/09) PERMIT No '1930870
08/11/01 RN/TP CORRECTIONS 10/27 /09 TTW /SV SAFETY NOTE API No 50- 029 - 22378 -00
01/18/04 JR/TLH OA DWNSQZ (08/22/03) 09/23/10 PJC SAFETY NOTE UPDATE SEC 16, T12N, R14E, 1759.29' FEL & 3036.49' FNL
06/07/05 WRR/TLH GLV C/O (03/24/05) 02/27/11 TQ/PJC SFTY NOTE (COMPOSITE WRAP)
06/18/05 JDM/PJC CORRECTION CHEM CUT 06/26/12 RWMIJMD SET IBP (06/21/12) 1 BP Exploration (Alaska)
DATE: 23- Aug -12
Stephanie Pacific) TRANS#: 6044
Data Deflvery Services Technician OVIakana K Bender
Schlumberger Oilfield Services , ` Natural Resources Technician It
WIRELINE Alaska Oil & Gas Conservation CommissicU
2525 Gambell St, Ste. 400 SCANNED MAR 2 7 2013
323 VI. 7• Ave, Suite 100 Anchorage, T.Y 9 _
Anchorage, AK 99503
'N: Office: (907) 273 -1770
WELL SERVICE `: ? OH;•.. RESERV CNL' • MECH ' LOG DESCRIPTION DATE B/W • COLOR CDs '
NAME ORDER # DIST DIST • -- BIS• ._. DI-ST- -- - --. LOGGED PRINTS PRINTS
G -258 BAUJ -00145 X MEMORY (PROF 25- Jul -12 1 1 CD
•
E -09C 6C00 -00024 X PPROF / IPROF MCNL 12- Jul -12 1 1 CD
G -048 0600.00025 X MEMORY PPROF / IPROF MCNL 10- Jul -12 1 1 CD
K -10C BAUJ -00138 X MEMORY PPROF W/ GHOST 29- Jun -12 1 1 CD
V -202 0600.00031 X MEMORY LDL 22- Jul -12 1 1 CD
2 -06A _ CSXI.00016 X MEMORY PPROF 13- Jul -12 1 1 CD
W -02A CSXI -00018 X MEMORY LEAK DETECTION 15- Jul -12 1 1 CD
14 -33A CSXI -00006 X MEMORY PPROF 13- Jun -12 1 1 CD
05 -23B BAUJ -00140 _ X MEMORY PPROF W/ GHOST 3- Jul -12 1 1 CD
H -09 C2JC -00027 X IPROF 23- Jun -12 1 1 CD
MPS -01B 8Z81-00021 IIIIIIIIIIIIEIIIIIIIIMIIMIMI PDC CORRELATION 9- Jul -12 1 1 CD
MPS -01B 8281 -00021 - USIT 11- Jul -12 1 1 CD
05 -228 BCRC- 00 IIIIIIIIIMIIIII MEMORY PPROF 9- Jul -12
. P1-05 8 IIIINIIIMIIIIIOIIIIIIIIII _ XFLOW W/ IBP SET RECORD 20-Jun-12 1 CD
1 CD
L1-09 BVYC- 00041 ONIIIIII PPROF 16- Jul -12 1 CD
NM APBSURVE �� 19- Jul -12 � PPROF 1 1 CD •
APBSURVEEL 1 CD
05 -228 BCRC -00196 X IIIIIIIIII _ MEMORY PPROF W/ GHOST 9- Jul -12 1 1 CD
18 -25A 11996389 X SCMT 13- Mar -08 1 1 CD
G -258 BAUJ -00145 X MEMORY PPROF W/ GHOST 24- Jul -12 1 1 CD
2 -13A BAUJ -00142 X MEMORY LEAK DETECTION 7- Jul -12 1 1 CD
X X / • �!:. ✓, /, .;;-r "--„� ._- k -- C %:-_; .: ti
Please return a signed copy to: Please return a signed copy / to:
BP PDC LR2-1 DCS 2525 Gam bell St, Suite 400
900 E Benson Blvd Anchorage AK 99503
Anchorage AK 99508 N
04 c,
(A d
J
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB-20
Post Office Box 196612
Anchorage, Alaska 99519-6612
January 1, 2010
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Anchorage, Alaska 99501
Subject: Corrosion Inhibitor Treatments of GPMA P1
Dear Mr. Maunder,
Iq~~s
Enclosed please find multiple copies of a spreadsheet with a list of wells from GPMA P1
that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10-404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Anna Dube,
at 659-5102.
Sincerely,
Torin Roschinger
BPXA, Well Integrity Coordinator
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10-404)
Date
8/13/2009
Well Name
PTD #
API #
Initial to of cement
Vol. of cement
um ed
Final top of
cement
Cement top off
date
Corrosion
inhibitor Corrosion
inhibitor/
sealant date
ft bbls ft na al
P1-01 1900270 50029220180000 NA 0.2 NA 1.70 7/6/2009
P1-02A 2020650 50029217790100 NA 0.1 NA 0.90 7/8/2009
P1-03 1890130 50029219120000 Cemented to flutes NA 0 NA 0.00
P1-o4 1930630 50029223660000 NA 0.2 NA 1.70 7/8/2009
P1-05 1930870 50029223780000 NA 0.2 NA 1.70 7/18/2009
P1-06 1961370 50029226950000 Sealed conductor NA NA NA NA
P1-07A 2040370 50029219960100 SC Leak NA NA NA NA
P1-OSA 2021990 50029223840100 NA 1.2 NA 6.50 7/8/2009
P1-09 1961540 50029227040000 NA 14.5 NA 141.10 7/9/2009
P1-11 1920860 50029222840000 NA 0.2 NA 1.70 7/7/2009
P1-12 1910130 5oo2s2213aoooo NA 0.6 NA s.ao 7n/2oos
P1-13 1930740 50029223720000 NA 1.5 NA 10.20 7/6/2009
P1-14 1930160 50029223380000 NA 1.5 NA 10.20 7/6/2009
P1-16 1930340 soo2s223asoooo NA 0.7 NA 6.80 7/6/2009
P1-17 1930510 50029223580000 NA 1.7 NA 11.90 7/7/2009
P1-18A 2020760 50029229530100 NA 1.8 NA 8.50 7/7/2009
P1-20 1920940 50029222880000 NA 0.6 NA 3.40 9/12/2009
P1-21 1930590 50029223630000 NA 0.6 NA 5.10 7/7/2009
P1-23 1961240 50029226900000 NA 1.6 NA 13.60 7/7/2009
P1-24 1961490 50029227030000 NA 10 NA 107.10 12/13/2009
P1-25 1890410 50029219370000 Sealed conductor NA NA NA NA
P1-G1 1921130 50029222980000 NA 0.2 NA 1.70 7/6/2009
10/01/09
SchWierger
N0.5405
Alaska Data Consulting Services Company: State of Alaska
2525 Gambol) Street, Suite 400 Alaska Oil Gas Cons Comm
Anchorage, AK 99503 -2838 Attn: Christine Mahnken
ATTN: Beth 333 West 7th Ave, Suite 100
Anchorage, AK 99501
Well Job Log Description Date BL Color CD
K -11 AY1M -00033 SBHP SURVEY j Ji[ fu 09/12/09 1 1
L4 -30 AWL8-00031 PRODUCTION PROFILE /t/ co r s� ,'j 08/06/09 1 t 1
P2 -31 AP3O -00045 LDL /9G /-Orj(0 /1" '9u 07/11/09
08/11/09 1 1 r
01 -29 ME-00009 PRODUCTION PROFILE 7f 1 1
J -22A 869K -00013 PRODUCTION PROFILE amp- 1 94 I� 08/30/09 1 1
W-44 8 Me.. 148.00071 INJECTION PROFILE t 09/06/09 1 1
12 -25 8 L 9 581 -00010 INJECTION PROFILE a(/ 08/22/09 1 1
L5 -33 AYKP -00051 SBHP SURVEY 9 11( b 09/01/09 1 1
P2-48 B69 -00015 SBHP SURVEY "1 0 09/01/09 1 1
Z -28 869K -00016 INJECTION PROFIL V ia4 /t-2.3/ 09/19/09 1 1
0.02A AP3O.00054 18P /LDL 1'4. 07/24/09 1 1
N -10A AXED -00040 MEM PROD PR ILE A a 0 8/2 5/09 1 1
W -24 AWJI -00044 MEM INJECTION PROFILE Off 0 �C/p8/15/09 1 1
V -03 82ND -00021 MEM PROD PROFILE aq ;!S Jg'} 09/03/09 1 1
H -14B 82WY -00026 MEM PROD PROFILE 08/27/09 1 1
P1 -01 AY1M -00031 1NJECT1ON PROFILE j 6 6 08/20/09 1 1
P1 -05 8581 -00009 PRODUCTION PROFIL .S 08/20/09 1 1
NK-10
B2WY -00023 MEM INJECTION PROFILE 11 08/22/09 1 1
13 -27A B2NJ -00019 MEMORY SCMT J' 08/13/09 1 1
18 -02B B2WY -00021 MEMORY SCMT a(� _.O 4 -4 -0'3 08/19/09 1 1
NK -38A AYKP -00049 USIT -Ai 3 1 08/17/09 1 1
06 -09 SWL8-00028 USIT. --05 07/30/09 1 1
13.03A 09AKA0150 OH O MWD /LWD EDIT ni 'f 07/06/09 2 1
C -18B B2NJ -00017 MCNL J Q I 4'�/ 08/09/09 1 1
1- 35/0 -25 B69K -00011 RST OO 08 /26/09 1 1
04 -35A AXED -00025 MCNL j CO 05113!09 l 1 1
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc. Alaska Data 8 Consulting Services
Petrotechnical Data Center LR2 -1 2525 Gambol! Street, Suite 400
900 E. Benson Blvd. Anchorage. AK 99503 -2818
n,
Scblum6erger
Alaska Data & Consulting Services
2525 4ambe1l Slreel, Suite 400
Mchorage, AK 99503-2838
ATTN: 8elh
Weu
~ NO. 5353
/`-yy~ Company: State o( Alaska
.~~~ ~ O V `/ ~ Alaska Oil & Gas Cons Comm
~ ~ Attn: Christine Mahnken
~ 333 West 7th Ave, Suite 100
Anchorage,AK 99501
Job # Log Description Date BL Color CD
09/i t/09
~~, . ~ ,. ~~ . ~
~ '
t1 , ~ ~
V-02
W-26A
H-32 82WY-D0018
B1JJ-00033
ANHY-00102 MEM PRODUCTION PROPILE `
MEM PRODUCTION PROFILE ~
PRODUCTION PROFILE ~ L- 07/27/09
07/2W09
07/25l09 1
1
1 ~
1
1
P2-29
L2-11
L2-06 AYTU-00052
ANHV-00106
B69K•00007 INJECTION PROFILE "~ ~ 7_~
LDL ~
CROSS FL W CHECK - 08/0Y/09
08/OY/08
07/31/09 1
1
1 1
7
1
. P2-28
1-213
V-221 AYTU-00051
82WY-00019
AXBD-00037 INJECTION PROFILE C, -~
MEM INJECTION PROFI E' -
MEM INJEC710N PROFILE' - 08/Ot/09
07/29/09
07/28/09 1
1
1 1
1
7 ~
L-220
07-22
04-02A 81JJ-00035
AZCM-00036
AYS4-00091 MEM INJECTION PpOFILE ~
PRODUCTION PROFILE - -
USIT 07/30/09
08/09l09
08/11/09 1
1
7 1
1
1
J-11A
Lt-09
X-28 AWLB-00029
AYS4-00088
AXBU00026 USIT -
PRODU TION PROFILE "_Q~
MEM INJECTION PpOFILE U 08/05/09
08/08/09
05/17/09
1
1 1 1
1
1
12-06
3-29/J-32
06-04A B3SU-00020
AP3~-00055
B5JN-00009 PRODUCTION PROFILE
IBP SET RECORD W/CHOSSGLOW ~
RST 08/14/09
08108/09
OB/23l09 1
1
1- 1
1
1
15-498 B2NJ-00013 MCNL - 07/15/09 1 1
03-328 09AKA0030 OH MWD/LWD EDIT 02/28/09 2 7
G-14B AWJI-00043 MCNL 07/24/09 1 1
L2-13A AWJI-00036 MCNL O6/17/09 ~
18-028 AWJI-00045 MCNL - ~/ pg~p~09 ~ ~
Pt-05 AWLS-00032 RST 08/09/09 1 y
B-16A B2WY-00020 MCNL '~ Q
` 08/03/09 1 ~
J-208 AXBD-00020 MCNL (REVISED)
. ~ ;`L 04/12/09 ~
P~encF errtinwi cnr.G wcc cior wv cir_uiu r_ ~ur, o~r~ ~o.~..~., .,.~~ ........ ~....~ ~...
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Alaska Data & Consulting Services
2525 Gambell Streel, SuAe 400
Mchorage, AK 995034B3B
°~ ~ ,,= t fi.
4„ :,,, ~.w.
~~
i
~~~~
03/06/08
~~~~~m~~~~~~
NO. 4621
Alaska Data & Consulting Services Company: State of Alaska
2525 Gambell Street, Suite 400 ~ (x' 6 Alaska Oil & Gas Cons Comm
Anchorage, AK 99503-2838 ~~~~ M~~ ~~ 10~~~ Attn: Christine Mahnken
ATTN: Beth 333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: P.Bay,Pt.Mac,Milne Pt,Orion,Lisburne
Wcll .Inh !k Inn Descrintinn Date Bl_ Colnr CD
C-41A 12021141 MEM LDL 02/25/08 1 1
MPS-01A 11970714 SCMT r} _ C 02/21/08 1 1
P1-O6 11975757 PROD PROFILE ~ ~ 03/02/08 1 1
Pi-05 11998992 PROD PROFILE 8' 02/29/08 1 1
Pi-06 11975757 SCMT (aj ~ 41' 03/02/08 1 1
09-23A 12045070 USIT gj - C ~ 03/02/08 1 1
L5-34 12057596 PROD PROFILE ~ 02/28/08 1 1
W-40 11970816 PRODUCTION LOG _j 03/04/08 1 1
15-04B 12005202 MCNL ~Q - i C 12/28/07 1 1
C-35B 12021139 MCNL ¢ 01/26/08 1 1
X-20A 11661178 CH EDIT PDC GR (MEM CORRELATION) _I 10/26/07 01~ 1
L-219 12017479 CH EDIT PDC GR (IBC) - [ /(p 01/02/08 1
F'LtASt AC:KNUWLtDCit Fit(:tll'I kfY S1faN1~1(a"i{IVIJ }StINFipIlNli`UNt I:UYY tAl:it IU:
BP Exploration (Alaska) Ina •
Petrotechnical Data Center LR2-1
900 E. Benson Blvd. ,
Anchorage, Alaska 99508 4 i ~ ~I'~, ~~~~~~~
Date Delivered: ~ )r., ~ ~ I,,,i~,,,;;
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Received by:
•
•
l3
-~~.
~,~ STATE OF ALASKA ~ ~
^~I '3~~0~LA~A OIL AND GAS CONSERVATION COMMON
`N Y
h f` ~ °~ ~ 2GOb
~~P~REPORT OF SUNDRY WELL OPERATI~I;~pil & Cas Ccx-s. Commissirx~
1. Operations Abandon ~ Repair WeII ~ Plug Perforations ~ Stimulated O ~ERREAM/MILL OUT
Performed: Alter Casing ~ Pull Tubing Perforate New Pool ~ Waiver Time Extension
Change Approved Program ~ Operat. Shutdown ~ Perforate ~ Re-enter Suspended Well
2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number:
Name: Development Exploratory ~ 193-oa7o "
3. Address: P.O. Box 196612 Stratigraphic ~ Service 6. API Number:
Anchorage, AK 99519-6612 50-029-22378-00-00
7. KB Elevation (ft): 9. Well Name and Number:
49.7 KB ~ P1-05 "
8. Property Designation: 10. Field/Pool(s):
ADLO-034624 - PRUDHOE BAY Field/ PT MCINTYRE OIL Pool
11. Present Well Condition Summary:
Total Depth measured 13828 r feet Plugs (measured) None
true vertical 9216.69 - feet Junk (measured) None
Effective Depth measured 13725 feet
true vertical 9159.28 feet
Casing Length Size MD TVD Burst Collapse
Conductor 80' 20" Surface - 121' Surface - 121' 1490 470
Surface 4195' 10-3/4" 45.5# NT-80 Surface - 4236' Surface - 3567' 5210 2480
Production 13804' 7-5/8" 29.7# L-80 Surface - 13804' Surface - 9303' 6890 4790
~~~~ ~iAR ~ ~ 20C
Perforation depth: Measured depth: 13056 - 13236 13272 - 13572 = _ _
True Vertical depth: 8773.73 - 8883.16 8904.38 - 9073.87 _ _
Tubing: (size, grade, and measured depth) 4-1/2" 12.6# 13Cr80 35 -.1876
0 0 -
Packers and SSSV (type and measured depth) 4-1/2" TRCF-4A SSV 2301
4-1/2" BakerSABL-9 Packer 12812
4-1/2" BKR S-3 PKR 12630
0 0
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure
Prior to well operation: SHUT-IN
Subsequent to operation: 42 12977 3935 1058
14. Attachments: 15. Well Class after proposed work:
Copies of Logs and Surveys Run Exploratory ~ Development ~ Service ~'
Daily Report of Well Operations X 16. Well Status after proposed work:
Oil Gas ~' WAG GINJ WINJ ~ WDSPL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
N/A
Contact Gary Preble
Printed Name Gary Pr e Title Data Management Engineer
Signature Phone 564-4944 Date 2/27/2008
Form 10-404 Revised 04/2006 S ~~~,_ ~A~ ~ '~ ~~~~ Submit Original Only
•
P1-05
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
ACTlVITYDATE ~ SUMMARY
2/22/2008 ***CTU 9 w/1./5" CT Job Scope: Mill/Underream Scale Tubing/Liner'**
«InterAct not publishing» MIRU Knock WHP down and RIH w. 2 7/8" PDM
w/ 3.7" Five Bladed Covex Junk Mill -tagged all nipples RIH -min motor work -
exit tbg tail to 12920' CTM -POOH chase flopro pill to surface. RIH w.
','' undereamer 3.5" body 6.625" blades ...Continue job on 2/23/2008...
2/23/2008: ***CTU 9 Continue job from 2/22/2008**'` «InterAct not publishing» Exit
',tubing tail and start scale removal from liner using underreamer w/ 6.625"
:blades 12880' CTM Saw heavy work around 13478' - 13482' CTM Caliper
';'report indicated restricted area at 13474' - no motor work 13482' - 13650' -
',Open circ sub - POH chasing flopro pill to surface. RDMO '`** Notify DSO to
'I leave well flowing **** Job complete *~~'
FLUIDS PUMPED
BBLS
1000 XS 1 % KCL
30 150 LSRV FLOPRO
58 60/40 METH
1058 TOTAL
PWDW2-1 9189796 00 escriDtion Date BL Color CD
LDL
W-11 1089310S WFL 02107/03 1
G-1SA 106790SS 04/06/0S 1
SCMT
P1..()S N/A 02/02/04 1
USIT
C-3SA 11209S9S 03/07/0S 1
SCMT
03/27/06 1
RECE\VED
Schlumberger
OCT 0 4 L006
~ C1l & Gas eons. eorom\sSicn
An<;i'1Ofage
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Well
Job #
L D
Petrotechnlcal Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
8CANNf~.1 Nmf Q 2; 2005
'03-6~1
~,_... '..:.-
09/19/06
NO. 3972
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99S01
Field: Prudhoe Bay
.
.
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
, STATE OF ALASKA
ALASKJ.. )IL AND GAS CONSERVATION Ct. )t1ISSION RI=CF.:IVED
REPORT OF SUNDRY WELL OPERATIONS"
APR 1 g 2005
1. Operations Performed:
o Abandon
o Alter Casing
o Change Approved Program
II§ Repair Well 0 Plug Perforations 0 Stimulate
o Pull Tubing 0 Perforate New Pool 0 Waiver
o Operation Shutdown 0 Perforate 0 Re-Enter Suspended Well
Alaska Oil III G,.I Cons. r.ommissic n
~_ge
o Time Extension
2. Operator Name:
BP Exploration (Alaska) Inc.
3. Address:
P.O. Box 196612, Anchorage, Alaska
7. KB Elevation (ft):
49.7'
8. Property Designation:
ADL 034624
11. Present well condition summary
Total depth: measured
Effective depth:
true vertical
measured
true vertical
13828
9217
13725
9159
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
80'
4195'
13767'
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
4. Current Well Class:
181 Development 0 Exploratory
o Stratigraphic 0 Service
5. Permit To Drill Number:
193-087
6. API Number:
50-029-22378-00-00
99519-6612
9. Well Namø and Number:
PBU P1-05
10. Field / Pool(s):
Prudhoe Bay Field / Point Mcintyre Pool
feet
feet Plugs (measured) None
feet Junk (measured) None
feet
Size MD TVD Burst Collapse
20/1 121' 121' 1490 470
10-3/4/1 4236' 3567' 5210 2480
7-5/8/1 13804' 9203' 6890 4790
SCANNE.D IJ¡PR 21 5 2.005
13056' - 13572'
8774' - 9074'
Tubing Size (size, grade, and measured depth):
Packers and SSSV (type and measured depth):
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
4-1/2/1, 12.6#
13Cr80
12876'
7-5/8/1 X 4-1/2/1 Baker 'SABL-3' packer; 7-5/8/1 x 4-1/2/1
Baker 'S-3' packer; 4-1/2/1 HES 'HXO' SSSV Nipple
12808' & 12630';
2302'
Treatment description including volumes used and final pressure:
13.
Representative Daily Average Production or Injection Data
Gas-Mcf Water-Bbl Casinq Pressure
8,641 14,602 8/26/04
6,126 150 04/11/05
15. Well Class after proposed work:
o Exploratory II§ Development 0 Service
16. Well Status after proposed work:
II§ Oil 0 Gas 0 WAG 0 GINJ 0 WINJ 0 WDSPL
17. I hereby certify that the foregoing Îs true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
Contact Paul Chan, 564-5254 N/A
Oil-Bbl
Prior to well operation: 1,488
Subsequent to operation: 390
14. Attachments: 0 Copies of Logs and Surveys run
II§ Daily Report of Well Operations
II§ Well Schematic Diagram
Printed Name Terrie Hubble
Signature ~~ q),1 ~
Form 10-404 Revised 04/2004
Tubinq Pressure
Title Technical Assistant
Pho~ Q k~4Þ481 /'\ I Date 04!Ia(O.C;
RRJì1fl5 it¿ µSlv , ,'J L
Prepared By Name/Number:
Terrie Hubble, 564-4628
Submit Original Only
)
)
PRE Raised and Secured Cellar Doors. Moved Rig off DS12-32 and
Positioned in Center of Pad for Derrick Down.
PRE PJSM- Prepared Derrick to LID. Removed Blocks from Top
Drive. Bridled Up Blocks. Lowered Pipeshed Skate Chute. LID
Derrick.
PRE PJSM-Broke Down BOPE's. Removed Single Gate, Dbl. Gate
and Annular from Cellar Area for Inspection & Reconfiguration.
PRE PJSM-Installed Booster Wheels
PRE PJSM-Moved Rig from DS12-32 to K-Pad/Pt. Mcintyre
Intersection.
PRE Moved Rig from K-Pad/Pt. Mac 1 Intersection to P1-05
Location
PRE Spotted Rig on Location and Remove Booster Wheels
PRE PJSM-Inspected Derrick, Raised Derrick, Raised Pipeshed
Skate Chute
PRE PJSM- Bridled Down Blocks & R I U Top Drive. R I U Drilll
Floor. Assembled BOPE Stack.
PRE Finished Sssembling BOPE Stack. Laid Herculite, Set Rig
Mats. Lined Up Rig to Move Over Well.
PRE Laid 3" X 6" Sills and Plywood Around Well Cellar. Staged
Wellhead Equipment in Cellar Area. Modified Cellar Doors to
Closed Around Wellheads. Accepted Rig @ 1800 hrs. 3-3-05
DECaMP Spotted Rig Over Well. Shimmed and Leveled Rig. Moved ESD
Panels on Wells 4 & 6 to Facilitate Cellar Door Closure. Hung
Arctic Curtains & Buttoned Up Cellar.
DECaMP Annulus Pressue 400 psi. Installed Secondary Annulus Valve.
R I U Line for Pressure Bleed Down. Bled Down Annulus to 0
psi. Recovered app. 4 bbls Diesel. R I U Circulating Lines to
Tree.
PJSM-R I U DSM Lubricator, Pulled BPV., 0 psi on Tbg. & IA.
RID Lubricator.
R I U Circulating Lines to Tree & Annulus. Took on 140 deg.
2% KCL Water and Mixed 40 bbls wi Safe-Surf W.
Pumped Down Annulus Took Returns off Tubing to Displace
Diesel out of Tubing, Pumped 100 bbls at 6 bpm, 875 psi.
Switched Valves to Pump Down Tubing, Took Returns off IA.
Pumped 40 bbs Safe-Surf W Pill, 150 bbls 140 deg. 2% KCL,
600 bbls 140 deg. 9.2 ppg. KCL to Displace Wellbore, Pump
Rate 8 bpm, 1,400 psi.
Set TWC & Tested from Below t/ 1,000 psi. BID & RID Lines
PJSM-N I D Production Tree & Adaptor Flange. Terminated
Control Lines. Function Tested all LDS, OK.
PJSM-N I U BOP Stack. Installed Blind Shear Rams in Top,
3-1/2" x 6" Variable Rams in Bottom. N I D, Switched and N I U
HCR's. M I U Choke & Kill Lines.
Repaired Accumulator Valve on Koomey
PI U & M I U BOPE Test Jt. R / U Test Manifold and Lines.
Filled Choke Manifold and BOP Stack wi Water.
PJSM-Tested BOPE, Tested all choke manifold valves,
Annular, Blind Rams, Choke & Kill HCR & Manual Valves,
Floor Safety Valve, Dart Valve, Upper & Lower IBOP to 250 psi
low fl 5min. & 3,500 psi high f/5 min. All Tests Held wi No
Leaks or Pressure Loss. AOGCC Rep. John Crisp wavied
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
P 1-05
P 1-05
WORKOVER
DOYON DRILLING INC.
DOYON 16
.·;båte
From.. 'To HoürsTcisk' Code NPT Phase
3/2/2005
04:00 - 06:00
2.00 MOB
P
06:00 - 08:30
2.50 MOB
P
08:30 - 11 :00 2.50 MOB P
11 :00 - 12:30 1.50 MOB P
12:30 - 00:00 11.50 MOB P
3/3/2005 00:00 - 02:00 2.00 MOB P
02:00 - 03:00 1.00 MOB P
03:00 - 06:00 3.00 MOB P
06:00 - 12:00 6.00 MOB P
12:00 - 15:30 3.50 MOB P
15:30 - 18:00 2.50 MOB P
18:00 - 21 :00 3.00 MOB P
21 :00 - 23:00 2.00 WHSUR P
23:00 - 00:00 1.00 WHSUR P DECOMP
3/4/2005 00:00 - 01 :00 1.00 WHSUR P DECaMP
01 :00 - 04:30 3.50 WHSUR P DECaMP
04:30 - 05:00 0.50 WHSUR P DECaMP
05:00 - 07:00 2.00 WHSUR P DECOMP
07:00 - 16:00 9.00 BOPSUP P DECaMP
16:00 - 18:00 2.00 BOPSURN RREP DECOMP
18:00 - 19:00 1.00 BOPSUP P DECaMP
19:00 - 23:00 4.00 BOPSUP P DECaMP
Start: 3/2/2005
Rig Release: 3/19/2005
Rig Number:
Spud Date: 6/14/1993
End: 3/19/2005
... . . '.
. DescriþtiönÒf Öpenuiqh$
Printed: 3/22/2005 11: 1 0:30 AM
)
)
BPEXPLQRA TIDN
. (l)perê:1tions·· S4rÎ1 rt1EiryReport
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
P 1-05
P1-05
WORKOVER
DOYON DRILLING INC.
DOYON 16
lHôurs TaskCödeNPT
Page2öf1p
Start: 3/2/2005
Rig Release: 3/19/2005
Rig Number:
Spud Date: 6/14/1993
End: 3/19/2005
DECaMP witnessing of test. Test witnessed by BP Rep. Rodney C.
Klepzig
NOTE: Unable to test pipe rams because of space constraints
between top of tbg. hgr. and ram cavity.
RID BOPE Test Equipment & Blew Down All Lines.
PJSM- Slipped and Cut Drilling Line. Serviced Top Drive
R I U DSM Lubricator, Pulled TWC, RID Lubricator
PJSM-M I U Baker 3-1/4" Dbl. Spear Assy. wi 3.947" Grapples
Worked on Top Drive Rotary Brake.
M I U Spear Assy to 4" Dp. RIH & Speared Tbg. PI U wi
20,000# to Ensure Grapples Engaged. BOLDS, Pulled on Tbg.
Hgr, Came Off Wellhead wi 165,000# PI U Weight, Pulled
Hgr. to Rig Floor, String Weight Up 145,000#.
DECaMP B I 0 & LID Spear Assy Terminated Control Lines. B I 0 & L
I D Tbg. Hgr.
DECaMP M I U Circulating Head & Lines. Circulated B I U @ 10 bpm,
1,600 psi. (R/U Camco Control Line Spooling Unit While
Circulating ). Blew Down Circulating Equipment and RID
Same.
POOH, LID 4-1/2" 12.6# Tbg, Spooled Up SS Control Line. B
I 0 & LID SSSV Assy RID Camco Spooling Unit.
Recovered 60 SS Control Line Bands.
POOH wi 4-1/2" 12.6# 13Cr80 NSCT Tbg. Recovered 320
Jts., 3 GLM Assy, 1 Sliding Sleeve Assy, 1 SSSV Assy, 3 Tbg.
Pup Jts, 1 Cut Off Jt. (19.77')
Clear & Clean Rig Floor. LID Tbg Equipment.
M I U Test Jt. & Test Plug and Installed. R I U Test Lines and
Tested Lower Pipe Rams to 250 psi Low fl 5 min, 3,500 psi
High fl 5 min, Removed Test Plug & Installed Wear Bushing
(6-15/16" ID). BOPE Test Witnessed By BP Drilling Supervisor
Rodney C. Klepzig.
DECaMP PJSM-P I U & M I U Baker Dress Off Assy. 6-3/4" X 4-1/2"
Washover Mill Shoe - 2 x WP Ext wi 4.85" X 3.80" Inside
Dressing Mil - Triple Conn Bushing - Double Pin XO - 7-5/8"
Scraper Spaced to Bttm. Out 12' from Tbg Stb - 2 x Junk
Baskets - Bit Sub XO - Bumper Jars - Oil Jars - XO - 18 X
4-3/4" DC. BHA Total Length: 605.34'.
DECaMP PJSM, Finished M I U 4-3/4" DC's.
DECaMP RIH wi Dress Off BHA on 4" DP, PI U DP 1 x 1 from Pipe
Shed, to 12,772'.
DECaMP M I U Top Drive, Engaged Pump and Established Parameters:
Pump Rate 4 bpm, 650 psi. String Weight Up 205,000#, String
Weight Down 145,000#, String Weight Rotating 170,000#.60
rpm, Torque 8,500 ft I Ibs. RIH Tagged Tubing Stub 12,777'
DPM. Washed Down Over Tubing Stub, 5 bpm, 900 psi, 80
rpm, Torque 10,000 ft I Ibs, Dressed off Tubing Stub 12,777' to
12,777.5'. PI U to 12,770', Shut Down Pump and Rotary, RIH
w/o Pump or Rotary to Ensure Overshot Goes Over Tubing
Stub, OK.
DECaMP Pumped and Circulated Around 40 bbl140 deg Safe-Surf W
Sweep. 9 bpm, 2,600 psi. Monitored Well, Blew Down Lines.
DECaMP POOH wi Dress Off Assy. Standing Dp Back in Derrick
DECaMP PJSM-POOH wI BHA, Stand Back DC's. K-Anchor Stuck In
3/4/2005
19:00 - 23:00
4.00 BOPSUP P
23:00 - 00:00 1.00 BOPSUP P DECaMP
3/5/2005 00:00 - 01 :30 1.50 EVAL P DECaMP
01 :30 - 02:30 1.00 BOPSUPP DECaMP
02:30 - 03:00 0.50 PULL P DECaMP
03:00 - 04:00 1.00 EVAL N RREP DECaMP
04:00 - 04:30 0.50 PULL P DECaMP
04:30 - 05:00
0.50 PULL P
05:00 - 06:30
1.50 PULL P
06:30 - 09:30 3.00 PULL P DECaMP
09:30 - 19:00 9.50 PULL P DECaMP
19:00 - 20:00 1.00 PULL P DECaMP
20:00 - 21 :00 1.00 BOPSUPP DECaMP
21 :00 - 00:00
3.00 CLEAN P
3/6/2005
00:00 - 01 :00
01 :00 - 12:30
1.00 CLEAN P
11.50 CLEAN P
12:30 - 13:00
0.50 CLEAN P
13:00 - 14:30
1.50 CLEAN P
14:30 - 20:30
20:30 - 23:00
6.00 CLEAN P
2.50 CLEAN P
Printed: 3/22/2005 11: 1 0:30 AM
')
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
P 1-05
P 1-05
WORKOVER
DOYON DRILLING INC.
DOYON 16
Start: 3/2/2005
Rig Release: 3/19/2005
Rig Number:
Spud Date: 6/14/1993
End: 3/19/2005
·.··.·Date >From-To . Hours Task . Code NPT Description ofOþérati()ns ..
3/6/2005 20:30 - 23:00 2.50 CLEAN P DECaMP Overshot. Remove K-Anchor from O/S and UD Same. Cut Off
Jt. 19.70', Pup Jt. & K-Anchor 7.90'. B/O & UD Dress Off BHA.
23:00 - 23:30 0.50 CLEAN P DECaMP Clear and Clean Floor
23:30 - 00:00 0.50 CLEAN P DECaMP PJSM-P/U & M/U Halliburton 7-5/8" Model 3L RBP on 1 Stand
of DP.
3n/2005 00:00 - 06:00 6.00 CLEAN P DECaMP RIH wi 7-5/8" Haliburton RBP on 4" Dp. t/ 9,900'
06:00 - 07:00 1.00 CLEAN P DECaMP M/U Top Drive and Establish Parameters. Strg. Wt Up 150K,
Strg. Wt. Dn 130K. RIH t/ 9,980'. P/U t/ 9,968'. Set RBP @
9,968'. Stacked 30K on RBP to Verify Set. P/U t/ 9,960' to
Verify Setting Tool Released from Plug. Closed Annular,
Pumped Down DP and Kill Line. Pressure Tested RBP &
7-5/8" Csg. t/ 3,500 psi. f/5 min. OK. Bled Down Pressure,
Opened Annular, B/O Top Drive and Blow DN TD & Kill Line.
07:00 - 10:30 3.50 CLEAN P DECaMP POH w/4" DP. B/O & UD RBP Setting Tool
10:30 - 11 :00 0.50 CLEAN P DECaMP Clear and Clean Rig Floor
11 :00 - 11 :30 0.50 CLEAN P DECaMP PJSM wi Rig Crew & Schlumberger Crew on E-Line Rig Up
11 :30 - 12:30 1.00 CLEAN P DECaMP R/U Schlumberger Equipment, M/U US IT Tool
12:30 - 16:00 3.50 CLEAN P DECaMP RIH w/ USIT Logging Tool, Log up f/4,000' t/ 2,000'. Rerun in
Corrosion Mode f/3,200' t/ 2,400'. POH w/ USIT Tools
16:00 - 17:00 1.00 CLEAN P DECaMP RID Schlumberger Equipment, Cleared Rig Floor
17:00 - 17:30 0.50 CLEAN P DECaMP M/U Hallibuton 7-5/8" RBP and Setting Tool
17:30 - 19:00 1.50 CLEAN P DECaMP RIH w/ HES 7-5/8" RBP on 4" Dp t/ 3,435'
19:00 - 19:30 0.50 CLEAN P DECaMP M/U Top Drive and Establish Parameters.. String Wt. Up 85K,
String Wt. Dn. 83K. RIH t/ 3,550', P/U t/ 3,542' & Set RBP.
Stacked 25K to Verify RBP Set. P/U t/ 3,510' to Verify
Released from Plug
19:30 - 20:00 0.50 CLEAN P DECaMP Break Circulation w/ 9 bpm./ 700 psi. 150 bbls. Shut Down
Pump and Monitor Well
20:00 - 20:30 0.50 CLEAN P DECaMP Close Annular, Open Kill Line, Pump Down DP & Kill Line.
Pressure Up t/ 3,500 psi. (held 15 min. OK). Bled Off
Pressure, Blow Down Top Drive & Kill Line.
20:30 - 22:00 1.50 CLEAN P DECaMP POH w/ HES RBP Setting Tool
22:00 - 00:00 2.00 CLEAN P DECaMP PJSM-P/U 1 Jt. 5-1/2" Csg. and Set In Stack. Close Annular
and Dump 24 x 50# Sacks of 20/ 40 Mesh Sand on Top of
RBP. Open Annular, Pull & UD 5-1/2" Csg.
3/8/2005 00:00 - 01 :00 1.00 CLEAN P DECaMP P/U & M/U Casing String Cutter, Stabilizer and RIH w/4-3/4"
DC's.
01 :00 - 02:00 1.00 CLEAN P DECaMP RIH wi Csg. Cutter on 4" Dp t/ 2,669'
02:00 - 03:00 1.00 CLEAN P DECaMP M/U Top Drive and Establish Parameters. String Wt. Up 87K,
String Wt. Dn. 85K.Pump 2.5 bpm @ 250 psi. RIH t/ 2,710',
P/U 2,700'. Looking for Collar. Increase Pump t/ 3 bpm @ 300
psi. RIH t/ 2,744', Located collar. P/U t/ 2,705', Located Collar.
RIH t/ 2,724'. Engage Cutters wi 3 bpm 1300 psi, 80 Rotary
rpm, 3K to 5K Torque. Observe Pump Pressure Increase t/ 340
psi. & Torque steady @ 4K when Cutters Penetrated Casing.
Shut Down Pumps and Rotary & P/U 5'. Bring on Pumps t/ 3
bpm/ 300 psi. and Slowly Slack Off Until Cutters Engaged Cut
and took 5K Dn. Wt.
03:00 - 04:00 1.00 CLEAN P DECaMP Observed Well Trying to U-Tube, 40 psi on OA. Opened Up OA
and Let Well Flowapp. 10 bbl. Engaged Pumps to Verify Cut
and Pumped Additional 20 bbl @ 5 bpm, Partial Returns. Pump
75 bbls 180 deg. Diesel with Hot Oil @ 2 bpm. Final Circ.
Pressure 900 psi. Followed by 30 bbl140 deg. 9.2 ppg KCL.
Printed: 3/22/2005 11: 1 0:30 AM
)
)
BPEXPLORATION. '
. . . >Qperations$u rn'l't1åry,A~por~
Let Diesel Soak in OA
Pump 20 bbl Detergent Sweep followed by 155 bbl. 140 deg
9.2 ppg KCL. Partial Returns
Pump 75 bbl150 deg. Diesel w/ Hot Oil. No Returns
Let Diesel Soak in OA
Pump 20 bbls. Detergent Wash followed by 100 bbls. 140 deg.
9.2 ppg KCL. Partial Returns @ 5 bpm.
POH w/ Casing Cutter & UD Same
Clear and Clean Rig Floor
M/U Pack-Off Retrieving Tool and Pull Pack-Off. Install Bowl
Protector, UD Running Tool
PJSM-M/U 7-5/8" Spear. RIH and Spear Casing. POH Csg. t/
Rig Floor. Up Wt. 11 OK
Circulate 200 bbl 9.2 ppg KCL. Partial Returns
B/O & UD Spear and Hgr.
Blow Down Top Drive and Return Circulating Line. R/U Back
Up Tongs for Pulling Csg.
PJSM-POH w/ 7-5/8" Csg. Recovered Hgr. & Pup. 68 Full Jts. .
& Cut Off Jt. @ 18.99'
Clear and Clean Floor
P/U & M/U 9-5/8" Washpipe and RIH, Stacked Out @ 24' in.
Contacted FMC about Internal Casing Spool Dimensions.
Casing Spool has False Bowl Installed wi 9-5/8" ID.After
Conferring with Anchorage Personal Decision was made to
forego Washpipe Run. Will Continue with 7-5/*' Back-Off BHA
Assy.
DECaMP Phase 3 Condition Declared. Put on Notice From Acting Area
Manager Jerry Bixby and HSE Advisor Herb Williams to Cease
Operations Until Weather Conditions Improve. Took Fuel,
Fresh Water & Gray Water Readings on Hand and Reported
Consumption Rate and Time Frame to IMT Team.
Phase 3 Conditions, Wait On Weather-Monitor Well for Fluid
Loss. No loss.
Work on Top Drive.
M/U BHA #5: Mule Shoe, XO, 9-Drill Collars, XO, Blanking sub,
XO, 3-sections of Back-off Tool, Pump Out Sub.
RIH BHA #5 on 4" DP from derrick. Filling DP Every Std. and
Topping Off Every 5. String Wt Up 83K
PJSM-C/O Bails to Allow Room for Circulating Head Pin
between Elevators and Pipe Grabber on Top Drive.
M/U Circulating Head Pin, Position Drill String, Lower Slips Set
@ 2,752', Upper Slips Set @ 2,732'. Pressure Up t/ 1,200 psi
to Set Slips. S/O t/ 75K to Verify Slips Set. Bled Pressure Dn. t/
o psi. and Continue to S/O t/ 45K, (string wt.) Pressure Up t/
3,000 psi. Observed 1/4 Turn to the Left in Drill String. Bled
Pressure Back t/ 0 psi. to Recycle Tool. Bring Pressure back
Up t/ 3,000 psi. No Reaction In Drill String. Repeat Pressure
Cylce With No Apparent Tool Function. Repeat Pressure Cycle
2 More Times, Increasing Lag Time Between Cylces Allowing
More Time for Tool to Reset W/O Success. Reposition Tool,
Lower Slips Set @ 2,747' & Upper Slips Set @ 2,737'.
Pressure Up t/ 3,900 psi. No Pipe Movement At Surface. Install
1/4 Left Hand Turn in Drill String W/O Success, Bled Dn.
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
P 1-05
P 1-05
WORKOVER
DOYON DRILLING INC.
DOYON 16
'Date· From- To Hours Task Code NPT Phase
3/8/2005 04:00 - 04:30 0.50 CLEAN P DECaMP
04:30 - 05:00 0.50 CLEAN P DECaMP
05:00 - 06:00 1.00 CLEAN P DECaMP
06:00 - 06:30 0.50 CLEAN P DECaMP
06:30 - 07:00 0.50 CLEAN P DECaMP
07:00 - 09:00 2.00 CLEAN P DECaMP
09:00 - 09:30 0.50 CLEAN P DECaMP
09:30 - 10:30 1.00 CLEAN P DECOMP
10:30 - 12:00 1.50 CLEAN P DECOMP
12:00 - 12:30 0.50 CLEAN P DECaMP
12:30 - 13:00 0.50 CLEAN P DECOMP
13:00 - 14:00 1.00 CLEAN P DECaMP
14:00 - 17:30 3.50 CLEAN P DECaMP
17:30 - 18:00 0.50 CLEAN P DECaMP
18:00 - 21 :30 3.50 CLEAN P DECOMP
21 :30 -
0.00 CLEAN P
3/9/2005 00:00 - 14:00 14.00 CLEAN P DECOMP
14:00 - 15:00 1.00 FISH N RREP DECaMP
15:00 - 17:00 2.00 FISH P DECaMP
17:00-19:00 2.00 FISH P DECaMP
19:00 - 19:30 0.50 FISH P DECaMP
19:30 - 22:00 2.50 FISH P DECOMP
Start: 3/2/2005
Rig Release: 3/19/2005
Rig Number:
Spud Date: 6/14/1993
End: 3/19/2005
.. ...
Description 9t. OperCitions
Printed: 3/22/2005 11: 1 0:30 AM
)
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
P 1-05
P 1-05
WORKOVER
DOYON DRILLING INC.
DOYON 16
Start: 3/2/2005
Rig Release: 3/19/2005
Rig Number:
Spud Date: 6/14/1993
End: 3/19/2005
· Datè Fr()m·..~·Tö ··Houl"s m~sk Code NPT Phase . ... DesëriptiqnofOperéitions·
3/9/200S 19:30 - 22:00 2.S0 FISH P DECaMP Pressure. Reposition Tool, Lower Slips Set @ 2,750' & Upper
Slips Set @ 2,730'. Pressure Up t/ 3,900 psi. No Pipe
Movement. Bled Off. Install 1 Turn to the Left wi rotary Table
and Hold. Pressure Up t/ 3,900 psi. Beld Dn. Pressure and
Released Torque in Drill String. Got Back 1/4 Turn. Repeat
Cycle W/O Success. Reset Lower Slips @ 2,740', Upper Slips
Above Stub @ 2,720'. Pressure Up t/ 3,000 psi. to Function
Test Tool. No Drill String Movement. Decision was Made to
POH and Inspect Tools.
22:00 - 22:30 0.50 FISH P DECaMP Drop Dart and Open Circulating Sub, RID Circulating Head Pin
22:30 - 00:00 1.S0 FISH P DECOMP POH wi Back-Off BHA
3/10/200S 00:00 - 02:00 2.00 FISH P DECOMP UD Complete Back-Off Assy. & Functioned Tested On Skate.
Back-Off Tools Functioned Correctly. POH wi DC's & Stand
Back In Derrick
02:00 - 02:30 O.SO FISH P DECaMP Clear and Clean Rig Floor
02:30 - 03:00 O.SO FISH P DECaMP Service Top Drive and Iron Roughneck
03:00 - 04:00 1.00 FISH P DECaMP Wait On Schlumberger, Load 4-1/2" Tbg in Pipshed, Strap &
Rabbit Same
04:00 - 06:00 2.00 FISH P DECaMP PJSM wi Schlumberger, Spot Unit, R/U Sheaves, Make E-Lirie
Connections and Test same.
06:00 - 07:00 1.00 FISH P DECaMP RIH wi 6-Strand x 6' Strinshot, log on depth, position across
collar @ 2,742' and fire successfully. Fired from 2,739' to
2,34S'.
07:00 - 07:30 O.SO FISH P DECOMP Phase 3, Level 3 weather across field. Called IMT, Field
Manager Jerry Bixby to alert him that we needed to safe-out
our well and were advised to POOH. POOH to allow BOPE
actuation, if needed. When tool pulled to floor, found that the
firing head had disengaged from the logging tool.
07:30 - 09:30 2.00 FISH P DECaMP Wait on weather.
09:30 - 12:00 2.S0 FISH P DECaMP Phase 2, Level 3. Herb Williams clarified tha once we could
plow to K-Pad road, we could declare the Point Mcintyre 1
access road as Phase 2, Level 2. RID SWS E-liners, call SWS
Slick-liners to clear them for transfer of a unit to P1-0S.
12:00 - 20:00 8.00 FISH P DECOMP Wait on SWS Slick-Line Unit. They were hung-up due to a
white-out condition from Security Gates to Deadhorse. An
overshot guide for the fishing tool has been procured from
Baker. The Slickline Unit will be escorted to Pt Mcintyre from
PBOC starting @ 1730 hrs.
20:00 - 22:00 2.00 FISH P DECaMP PJSM w/ Rig Crew and Schlumberger Crew. Spot Unit, R/U
Sheaves and Slickline. M/U Baker 6.25" Cut Lip Overshot wi
1.66" Grapple, XO, 1-7/8" x7' Long Stroke Spangs, 1-7/8" x4'
Oil Jars, 1-7/8" x 8' Stem, 1-3/4" x 6" Rope Socket
22:00 - 00:00 2.00 FISH P DECaMP RIH wi Overshot on .12S' Slickline. Tagged @ 272S' (7-S/8"
stub), Worked Through Stub and Continued In Hole t/ 3,S24'.
Set Dn. 2 Times, Observed Overpull of 600#. POH wI
Overshot-No Fish, Inpected Grapple, One Impact Mark on Btm.
of Grapple.
3/11/200S 00:00 - 06:00 6.00 FISH P DECaMP RIH wi Overshot & 1.66' Grapple, (run #2). Tagged @ 3,53S',
Set Down S Times, POH, Observed Overpull of 1,000# First
200' off Btm. No Fish. Inspected Grapple, 2 More Impact
Marks Close to the First Mark. Install Knuckle and RIH wi
Overshot (run #3), Tagged @ 3,537', Jarred Dn., POH-No
Fish, No New Marks on Grapple, Remove Knuckle and RIH
Printed: 3/22/2005 11: 1 0:30 AM
)
)
Legal Well Name: P 1-05
Common Well Name: P 1-05 Spud Date: 6/14/1993
Event Name: WORKOVER Start: 3/2/2005 End: 3/1 9/2005
Contractor Name: DOYON DRILLING INC. Rig Release: 3/19/2005
Rig Name: DOYON 16 Rig Number:
Date FromJTÓ Hours Task Code: NPT Descriþtion· Ofºperati()~s· .
3/11/2005 00:00 - 06:00 6.00 FISH P DECaMP (run #4), Work Overshot and POH-No Fish, No New Marks.
Rermove Overshot and Attach 4.5 " LIB, RIH (run #5), Unable
to Get By 7-5/8" Stub, POH, RIH wi 4" LIB wi 4.5" Stablizer
Above It. Tagged @ 3,538', POH, No Definitive Impression.
Attach 4.5" LIB wi Knuckle & RIH, Tagged @ 3,538', POH,
Nothing but Sand Imprint.
06:00 - 07:00 1.00 FISH P DECaMP M/U Pump Bailer wi jars.
07:00 - 12:00 5.00 FISH P DECaMP RIH and tag sand @3,538'. Work Bailer and POOH. Recovered
1-1/2 gallons of sand. No tell-tale marks to indicate small
diameter tool inside mule-shoe. RIH wi cleaned Bailer and
re-tag @ 3,538'. POOH and recover 3 gallons of sand. No
tell-tale marks. RIH to 3,538', work Bailer, POOH. Recover 1
gallon and find a mark on the throat edge of the mule shoe that
we interpreted to be from the top of the fishing neck of the
RBP.
12:00 - 18:00 6.00 BOPSUR P DECaMP R/U for and test BOPE to 250/3,500 psi per AOGCC and BP
requirements. John Crisp, AOGCC Rep, waived witnessing the
BOPE tests.
18:00 - 18:30 0.50 BOPSUF P DECaMP Bleed down BOPE test. Remove Test Plug & Install Wear Ring
18:30 - 00:00 5.50 FISH P DECaMP PJSM-R/U Schlumberger Slickline Sheaves and 3.5" Bailer for
Dump Bailing 20/40 mesh sand on top of RBP @ 3,542'. Drop
1 Sack per Bail Run, 10 Sacks Total. Run # 1 Failed, Dump
Release Pin Did Not Shear, Replaced Steel Pin with Brass Pin
and Try Again. Run # 2 Failed, Pin Sheared, Dump Release
Jammed with Sand. Remove "O"-Ring on Dump Valve &
Rerun. Run # 3 Successful
3/12/2005 00:00 - 07:00 7.00 FISH P DECaMP RIH wi 3.5" Dump Bailer. Dump 10 x 50 # Sacks 20/40 Mesh
Sand On Top of RBP @ 3,542'. 1 Sack per Run, Total of 10
Sacks, all runs successful. Top of sand is @ 3,528'.
07:00 - 08:00 1.00 FISH P DECOMP PJSM, RID Schlumberger, prepare DP handling eqpt for RIH wi
Backoff BHA.
08:00 - 10:00 2.00 FISH P DECaMP M/U BHA #6: Mule Shoe, XO, 18-Drill Collars, XO, Blanking
sub, XO, Bottom Backoff Anchor, Backoff Tool, Top BIO
Anchor, Pump Out Sub, XO.
10:00 - 12:00 2.00 FISH P DECaMP RIH wi BHA #6 on 4" DP from Derrick.
12:00 - 13:00 1.00 FISH P DECaMP Start pump and set top Anchor @ 2,732' and work tool in
pressure cycles from 0 to 1,400 psi decreasing to 0 to 700-800
psi for 13 cycles. The initial breakout was @ 1 ,400 psi or
-9,000 ft-Ibs of applied torque. 13 cycles produced slightly over
4 complete rotations.
13:00 - 15:30 2.50 FISH P DECaMP Drop Dart to open Pump Out sub. POOH wI BHA #6 and
Break-out and UD Back-off Tools.
15:30 - 16:00 0.50 FISH P DECaMP Service Top Drive.
16:00 - 17:30 1.50 FISH P DECOMP BIO and UD 9-DCs. SIB 3-Stands of DCs.
17:30 - 18:00 0.50 FISH P DECaMP M/U BHA #7: 3-1/2" Bullnose, 4-3/4" Spear Packoff Assy, XO,
5-3/4" Spear wi 6.676" Grapple, Stop Ring, 5-3/4" Stop Sub,
XO, Bumper Sub, XO, 9-Drill Collars.
Noticed Rotating Head Assy. on Top Drive Loose.
18:00 - 19:00 1.00 FISH N RREP DECaMP POH and UD BHA
19:00 - 00:00 5.00 FISH N RREP DECOMP Troubleshoot Loose Rotating Head Assy. Break Out Saver
Sub and Lower IBOP. Remove Grabber and Disassemble
Lower Rotating Head Assy.
3/13/2005 00:00 - 10:00 10.00 FISH N RREP DECaMP Repair Top Drive, Disassemble Lower Rotating Head Assy.
Printed: 3/22/2005 11: 1 0:30 AM
)
)
. . : BPE!<F>L()RATrION· . .
··Qpêr~t:ion~.·..·$LlmI11êJrY ·.·Ff~port.·.
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
P1-05
P1-05
WORKOVER
DOYON DRILLING INC.
DOYON 16
Date·····
Frpm.-To Hours ···Tåsk Cöde ··.NPT ·Phase
3/13/2005
00:00 - 10:00 10.00 FISH N RREP DECOMP
10:00 - 12:00 2.00 FISH P DECOMP
12:00 - 13:00 1.00 FISH P DECaMP
13:00-14:00
1.00 FISH
P
DECaMP
14:00-18:00
4.00 FISH
P
DECaMP
18:00 - 20:00
2.00 CASE
P
TIEB1
3/14/2005
20:00 - 00:00
00:00 - 04:30
04:30 - 06:00
RREP TIEB1
TIEB1
TIEB1
4.00 CASE
4.50 CASE
1.50 CASE
N
P
P
06:00 - 10:30 4.50 BOPSUPP TIEB1
10:30 - 12:00 1.50 BOPSUPP TIEB1
12:00 - 13:30 1.50 BOPSUPP TIEB1
13:30 - 15:00 1.50 REMCM-P TIEB1
Start: 3/2/2005
Rig Release: 3/19/2005
Rig Number:
Spud Date: 6/14/1993
End: 3/19/2005
: Déscr~ptioq9f·QþeratiohS
Torque Upper Base Plate Bolts & Safety Wire Same.
Reassemble Lower Rotating Head, M/U Lower IBOP & Saver
Sub. Install Grabber.
M/U BHA #7, and RIH on DP from Derrick.
P/U wt 84K, SIO wt 83K. Lower BHA and set into 7-518" stump.
Make 7-revolutions to back-out the stump. Pulled to 85K, but
no go. Slack-off to 84K, back-out one more turn, then pull to
86K and no go.· Repeat for 10 more revolutions wi same
results, so decide to POOH, seeing no additional drag.
POOH and S/B4" DP. The 20.92' long, 7-5/8" Stump was
attached to the Spear. Threads on the pin were in very good
shape, showing no galling or drag marks. There were no signs
of cement bonding, but there were several areas around the
casing that had thin layers of fine, mushy sand stuck to the
surface, which were easily scraped off.
Clear and clean rig floor and R/U up for 7-5/8" handling
equipment.
RIH wi Triple Connector, 3 ea. 10' x 7-5/8" BTC Pups,
ES-Cementer, Vam Top HC x BTC XO JT., 7-5/8", 29.7# L-80
Vam Top HC Casing tieback to 2,740'. Tagged @ 35' in,
suspect parted 10-3/4" Csg. This is approximately where the
level of our fluid has been staying.
Skate Cable Broke
Remove Old Skate Cable and Install New Cable
RIH wi 7-5/8" 29.7# L-80 Vam Top HC Csg.
M/U Top Drive & Establish Parameters, String Wt. Up 11 OK,
String Wt. Dn. 11 OK, Rotary Wt. 108K, Rotary RPM 5, Pump
Rate 2 bpm @ 30 psi. Shut Down Rotary & RIH and Tagged
@ 2,731', Establish Rotary @ 5 RPM and Weight Fell Off.
Continue RIH t/ 2,735', Observed Pressure Increase to 70 psi.
Shut Down Pumps and Continue to Rotate and Make Up
Connection until Final Torque of 11,000 ft/lbs was Achieved.
Pressure Tested Csg. t/ 2400 psi fl 30 min. Good Test. Bled
Down Pressure & Pulled 160K. Slack off string wt and prepare
to split BOP Stack to install Emergency Slips.
Split BOP Stack, Install False Bowl, Emergency Slips, and
temporary Seal.
N/U BOP Stack. Install Schlumberger Cementing Head.
PJSM wi Schlumberger, Halliburton, Veco, and Doyon
personnel. Based on input from participants, change line-up for
returns to Cuttings Tank. Pressure Test BOP.
Break circulation, returns at surface almost immediately. Begin
wi 2 Bbls freshwater, then 2 Bbls neat Arctic Set 1 Slurry,
followed by 20 Bbls Arctic Set 1 mixed wi 40# CemNet and
200# Bentonite. Pump 100 Bbls neat Arctic Set 1 Slurry,
followed by 10 Bbls freshwater. Then Start rig pump and pump
124 Bbls 9.2 ppg KCI from Mud Pits. See pressure begin to
rise @ - 122 Bbls and build from 900 psi to 1,940 psi and see
cementer shift. Continue to 2,300 psi and SID Rig Pump.
Returns stopped after -80 Bbls of the cementing stage were
pumped, then at - 125 Bbls, returns began again and -2 Bbls
before the plug bumped, the returns had cement. Upon
cleaning the return line, more cement came through the
Printed: 3/22/2005 11: 1 0:30 AM
')
)
. BPEXPl._ORATION
. .
Oip~r~tiOn$ S:LJ.O"I lTI~ry!Aep()rt
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
P1-05
P1-05
WORKOVER
DOYON DRILLING INC.
DOYON 16
PageBof10
Start: 3/2/2005
Rig Release: 3/19/2005
Rig Number:
Spud Date: 6/14/1993
End: 3/19/2005
Date
Frorn-ToHours Task: Code NPT
3/14/2005
1.50 REMCM-P
TIEB1
13:30 - 15:00
15:00 - 16:00
1.00 REMCM-P
TIEB1
16:00 - 22:00
6.00 BOPSUP. P
TIEB1
22:00 - 23:00
1.00 BOPSUR P
TIEB1
23:00 - 00:00 1.00 P TIEB1
3/15/2005 00:00 - 01 :00 1.00 CASE P TIEB1
01 :00 - 01 :30 0.50 CASE P TIEB1
01 :30 - 02:30 1.00 CASE P TIEB1
02:30 - 03:30 1.00 CASE P TIEB1
03:30 - 04:00 0.50 CASE P TIEB1
04:00 - 06:00 2.00 CASE P TIEB1
06:00 - 08:00 2.00 CASE P TIEB1
08:00 - 08:45 0.75 CASE P TIEB1
08:45 - 10:00
1.25 FISH
P
TIEB1
10:00 - 11 :30
1.50 FISH
P
TIEB1
11 :30 - 14:30
3.00 FISH
TIEB1
P
cuttings chain. Estimate that 1 to 1-1/2 Bbls of watery cement
were returned to cuttings tank. Cement in Place @ 1500 hours.
RID Schlumberger, clean return lines and cement lines. RID
Cementing Head.
NID BOP and Remove Temporary Pack-off. Drain Fluid from
XO Jt. & Make Primary Cut. Remove XO Jt. from BOPE's.
Remove Drlg. Nipple Because of Height Constraints. P/U
BOPE & Set Pack-off. N/U BOPE. Install Wear Ring
Test Pack-off to 3,500psi. Observe Pressure Loss of 400 psi.
Pump Back Up to 3,500 psi. 400 psi Pressure Loss. Bled Down
Pressure, Test Fluid Aired Up. Pump Fluid Until No Air in
Returns. Pressure up to 3,500 psi. Presuure loss of 50 psi Over
30 min. Test Witnessed by BP Drilling Supervisor Rodney C.
Klepzig
P/U & M/U BHA #8. HTC STX-1 6-3/4" Bit (3-20's), 2 ea Boot
Baskets, 7-5/8" Csg. Scraper, XO, Bumper Sub, Oil Jars XC, 9
DC's = 313.75'
RIH wi BHA #8. on 4" DP
Service Top Drive & lronroughneck
RIH wi 4" DP tJ 2700'
M/U Top Drive & Establish Parameters. String Wt Up 80K,
String Wt Dn. 80K, Rot String Wt. 80K, Pump Rate 5 bpm,
Pump Pressure 300 psi., Rot. RPM 50, Off Btm Torq. 2k
ft/lbs., On Btm Torq. 4 to 7K ft/lbs. SIO & Tag @ 2,703'. Drill
ES Cementer f/2,703 t/2,705'. P/U t 2,700' and Ream Dn. t/
2,710'. Repeat Twice. Wash Dn to 2,800'
BIO Top Drive, Stand Back 1 std. 4" DP. Blow Down Top Drive.
Install Circulating Head Pin & Test Csg. t/ 3,500 psi. Bleed
Pressure Down, Blow Dn. Lines & RID Same, BIO Circulating
Head Pin.
POOH and SIB DP and DC's. BIO BHA and clean junk
baskets, find some small bits of rubber.
M/U BHA #9: 6-5/8" Reverse Circ Jet Basket wi Mill Shoe
Extension, Double Pin Sub, 2-Boot Baskets, Bit Sub, Bumper
Sub, Oil Jar, XO, and 9-DCs.
RIH BHA #9 and tag hard fill @ 3,523'. (Center of RBP @
3,542', top of 2.25" Fishing Neck @ 3,538').
Establish Parameters; P/U wt 90K ,SIO wt 85K, WOB 2-3K, 4
BPM, 80 RPM. Work down to 3,528' and recover cement and
sand over shakers. Stop Rotating, increase rate to 10 BPM,
2,900 psi and WID to 3,538'; progress stops. P/U 5' and slowly
WID to stop at same spot. Repeat again, then put 2K on bit,
rotate one revolution and make -1' of progress to 3,539'. P/U 5'
and slowly WID to stop at 3,539'. Put 2K on bit, rotate one
revolution, and make -1' to -3,540'. P/U and circ, then decide
to POOH. During the entire process, recovered lots of sand,
bits of cement plug rubber, aluminum flakes, paint, and blue
tape.
POOH and SIB DP and DC's. BIO BHA #9. Recovered the
entire String Shot fish: the Firing Head, 6' of 1/2" steel rod, and
the 2-1/2" x 3" long Bull Nose. The Jet Basket also held large
chunks of Cementer aluminum sleeve and chunks of Cement
Printed: 3/22/2005 11: 1 0:30 AM
)
)
E3P EXPLORATION
QpE!ratioO$·ßu I11marYFlE!port
Start: 3/2/2005
Rig Release: 3/19/2005
Rig Number:
Phase
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
P 1-05
P 1-05
WORKOVER
DOYON DRILLING INC.
DOYON 16
Date From~To Hours Task Code NPT
3/15/2005 11 :30 - 14:30 3.00 FISH P
14:30 - 15:30 1.00 FISH P
15:30 - 16:45 1.25 FISH P
TIEB1
TIEB1
TIEB1
16:45 - 18:30 1.75 FISH P TIEB1
18:30 - 21 :00 2.50 FISH P TIEB1
21 :00 - 22:00 1.00 FISH P TIEB1
22:00 - 22:30 0.50 FISH P TIEB1
22:30 - 23:00 0.50 FISH P TIEB1
23:00 - 00:00 1.00 FISH P TIEB1
3/16/2005
00:00 - 00:30
0.50 FISH
P
TIEB1
12:30 - 01 :30 13.00 FISH P TIEB1
01 :30 - 07:00 5.50 FISH P TIEB1
07:00 - 08:30 1.50 FISH P TIEB1
08:30 - 13:45 5.25 FISH P TIEB1
13:45 - 17:00 3.25 FISH P TIEB1
page 9öfl0
Spud Date: 6/14/1993
End: 3/19/2005
Plug rubber. Joy in Camp.
M/U BHA # 10: HES RBP Overshot and RIH on DP from
Derrick.
Establish parameters: 6.3 BPM, 360 psi, P/U wt 85K, SIO wt
82K. Slowly lower down over RBP Fishing Neck and see
pressure climb to 520 psi. Set down to 50K, Turn to right for
3/4 turn, P/U to 85K and move RBP slightly. Relax to 50K and
repeat cycle. Rotate 3/4 turn. SID pump and repeat cycles
again. P/U to 85K and rotate full turn. RBP is free, so lower
another 10 feet to ensure RBP is free, then start pump and
circulate Bottoms Up.
POH wi top RBP, SIB DP. Breakout and LID RBP.
RIH wi same BHA to pull bottom RBP. Tagged up at 9913'.
Had 51 I of fill from top of RBP at 9964'. P/U off bottom,
established parameters: P/U wt 70K#, SIO wt. 116K#.
R/U test equipment: 'T', valve and swing to drill string, pressure
line to chart recorder. Tested 7-5/8" casing, recorded pressure
at 3500 psi for thirty minutes, held ok.
RID test equipment. R/U to reverse circulate.
Established parameters: engaged pump at 4 bpm - 380 psi.
Rot. wt. 143K# at 40 rpm. Washed down, with minimum drag,
FI 9913' T I 9958'.
Closed annular, opened kill line. Took 25K # wt. Reverse
circulated BU, while washing and working 3-3/8" aD JDC OS to
top of RBP at 9964' . Observed increase in pressure to 880 psi.
Had high volume of oily dark colored sand observed across
shakers. Circulated additional BU until no sand at shakers.
Final pressure 790 psi psi at 5 bpm. Total pump strokes
reverse circulating 3013 strokes.
Opened annular. Blew down kill line. Lined up to circulate long
way and unseat RBP. Overpulled 5K# above 175K# P/U wt.
Set 35K# down and made two right hand turns. Worked string
up to 175K# P/U wt. Got release at 165K#. Let element relax
15 minutes. Ran back in to just below 9964' and confirmed
catch.
Engaged pump at 8 BPM 1470 psi. Circulated annular
capacity. Total pump strokes 3295psi. Monitored well, no gas.
Well stable. final pressure 1670psi.
Held PJSM. BIO top drive, blow down same. POOH slowly wi
RBP. A 1" x 1-1/2" chunk of Bronze metal was found jammed
between the Overshot and the fishing neck of the RBP.
PJSM. M/U BHA #11: 2-3/8" JDC Overshot, XO Sub, 3-joints
2-7/8" PAC DP, XO Sub, Bumper sub, Oil Jar, Pump Out Sub,
XO Sub, 9-DCs.
RIH to Retrieve 3-3/8" Baker IBP @ 12,835'.
Parameters @ 12,770': P/U wt 228K, SIO wt 125K. Establish
circulation, 3.8 BPM @ 530 psi. SID pump and slowly RIH from
12,770'. Stop progress @ 12,807'. P/U and rotate 1/2 turn,
slowly work back down to 12,807'. P/U and repeat cycle.
Establish circulation, 7.1 BPM @ 770 psi. SID pump, realign
valves and Rev Circ 6 BPM @ 1400 psi. Work down to 12,815';
increase to 8 BPM @ 2,300 psi. and continue to Rev Circ for
350 Bbls. Recovered steady flow of fine, oily sand over the
Printed: 3/22/2005 11: 1 0:30 AM
)
)
. ·i3PEXPLORATION
. .... .. .. .
·Qperªti()ns Slim marY8eport
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
P 1-05
P 1-05
WORKOVER
DOYON DRILLING INC.
DOYON 16
Start: 3/2/2005
Rig Release: 3/19/2005
Rig Number:
Spud Date: 6/14/1993
End: 3/19/2005
. [)a.te From J To Hours .. Ta.sk Cpde NPT Phase .. .... DescriþtionofOperaJions
3/16/2005 13:45 - 17:00 3.25 FISH P TIEB1 Shakers which changed to a large-grained, multi-colored sand
return. May have recovered more than 1-Bbl of sand before the
returns were clean. SID and re-align for Long-way Circ. See a
quick pressure increase while slowly lowering to 12,818'. Slack
off until wt is 50K, then P/U to 235K and hold for 30 minutes.
Slack-off, then P/U and the IBP released. POH one stand to
clear IBP from packer and monitor well. Fluid level slowly
dropped. First fluid loss was 1/2 Bbl/min; 2nd fluid loss was
1-1/2 to 2 Bbls/min.
17:00 - 00:00 7.00 FISH P TIEB1 POOH. LID Drill Pipe. Double displace every five stands out.
3/17/2005 00:00 - 07:00 7.00 FISH P TIEB1 POOH. LID Drill Pipe. Double displace every five stands out.
R/U 2-7/8" elevators and tongs, LID 2-7/8" PAC DP and IBP.
No visible damage to IBP.
07:00 - 07:30 0.50 RUNCOMP RUNCMP Pre-Job safety Meeting wi all hands and Baker Packer Expert.
07:30 - 00:00 16.50 RUNCOMP RUNCMP P/U completion accessories and make up per instructions from
Baker Packer-Rep. BakerLok all connections below the Packer.
RIH w/completion, Torque Turn all 4-1/2", 12.6 ppf, 13Cr85,
Fox connections to 4,280 ft-Ibs. Use Jet Lube Seal Guard on
same.
3/18/2005 00:00 - 10:30 10.50 RUNCOMP RUNCMP RIH wi 4-1/2", 12.6#, 13Cr85, Fox completion to jt 324. M I U
Control Line to Safety Valve Landing Nipple, continue running
completion, banding each joint. Utilized 70 SS Bands.
10:30 - 11 :30 1.00 RUNCOMP RUNCMP P/U Tubing Hanger wi 4-1/2", TCII Landing Joint. Completions
String P/U wt 156K, SIO wt 115K. Pass Control Lines thru
pentrations in Tubing Hanger and install packoffs. Land Tubing,
RILDS. Test Control Lines to 5K for 10 minutes--OK.
11 :30 - 15:30 4.00 RUNCOMP RUNCMP Drop Ball and Reverse Circulate 180 Bbls of 140 F, 9.8 ppg
Brine (2% KCI + NaCI) and 400 Bbls 9.8 ppg Brine mixed wi 2
Bbls Correxit Corrosion Inhibitor. Circulated 513 Bbls and did
not lose returns, but hauled off 290 Bbls and captured 70 in the
Pits to be hauled when Diesel is circulated around for Freeze
Protect.
15:30 - 18:00 2.50 RUNCOMP RUNCMP Realign valves and pressure up on tubing to set Packer.
Increase pres to 3500 psi, hold and chart for 30 mins--good
test. Realign Valves and PT annulus to 3500 psi, hold and
chart for 30 mins--good test. Bleed pressure on both sides,
then pressure up on annulus to shear the DCK valve in the #4
GLM. Sheared @ 2600 psi.
18:00 - 18:30 0.50 RUNCOMP RUNCMP RID landing jt., blow down lines.
18:30 - 19:00 0.50 BOPSUP P RUNCMP Set TWC valve, test to 1000 psi -Held Ok.
19:00 - 22:00 3.00 BOPSUPP RUNCMP ND BOPE'S.
22:00 - 00:00 2.00 WHSUR P RUNCMP N/U Adapter flange and tree.
3/19/2005 00:00 - 02:00 2.00 WHSUR P RUNCMP NU tree and test to 5000 psi, OK.
02:00 - 03:30 1.50 WHSUR P RUNCMP P/U lubricator, pull TWC valve.
03:30 - 04:30 1.00 RUNCOrvP RUNCMP Reverse circulated 140 bbls Diesel.
04:30 - 07:30 3.00 RUNCOrvP RUNCMP Allow Diesel to U-tube.
07:30 - 08:00 0.50 RUNCOrvP RUNCMP P/U Lubricator and install BPV.
08:00 - 09:00 1.00 WHSUR P POST Secure Cellar and Tree. Release Rig @ 0900 hours.
Printed: 3/22/2005 11: 1 0: 30 AM
I TREE =
'~ ,.,
WELLHEAD =
ÄCiÚÄTOR; ..
KB.ELéi;
"sF.ELSi;
KOP=
Mâx'Angle =
,,,....",,.... "........ "". ""...
Datum MD =
DatumTVD =
FMC
FMC
.."",.,...",,,..,.,,,,,,....,..,
BAKERC
50'
P1-0,)Proposed COmplbL~On
.... ""......."........,..""..."...,
1332'
.,...·,..".w......·..·,..·,...,,,,,,.'.,..·.;.,·,,·,·.·.'..
. 5!(~11!29'
13180'
8800' SS
I ~ 7\ \ l-i CEMENTED TO SURFACE
e
I ~30ó\ l-i 4-1/2" TRSV
7-5/8" CSG, 29.7#, L-80, ID = 6.875" 1-1 12499' I
,
~
GAS LIFT rv1ANDRELS
ST MD TVD DEV TYÆ VLV LATCH PORT DATE
1
2
3
4
5
10-3/4" CSG, 45.5#, NT-80, ID = 9.953" 1-1 4236'
L
Minimum ID = 3.725" @ 12856'
4-1/2" PARKER SWN NIPPLE
4-1/2" TBG, 12.6#, 13CR-80,
.0152 bpf , ID = 3.958"
-i \ 2.~~7 1
I
:8:
I I \Øltð\ 0 l-i 4-1/2" HES "X' NIP, ID = 3.813"
:8: ~ \~\c:>'301-i7-5/8" X 4-1/2" BAKER S-3 PKR
! ~ ' \;>'.J~·'·t<;l-i 4-1/2" HES "X' NIP, ID = 3.813"
~ I \ ~Cø 9ï l-i UNIQU[ MI\ CIUt ~[ OVt:K51 tOT W LJ;Q 1
:8: :8: ~ 12812H-I7-5/8" X 4-1/2" BAKER SABL-3 PKR, ID = 3.88" I
,d .
~ ~ I: 12839' -I 4-1/2" PARKER SWS NSCT NIP, ID = 3.813" II
! \ 12856' 1-1 4-1/2" PARKER SWN NSCT NIP, ID = 3.725"
12876' 1-1 4-1/2" TUBING TAIL, WLEG, ID = 4.0" I
1
1
1
ÆRFORA TION SUMrv1A RY
REF LOG: CDR ON 07/8/93
ANGLEATTOPÆRF: 51 @ 13056'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV AL Opn/Sqz DA TE
3-3/8" 6 13056 - 13236 0 09/02/93
3-3/8" 6 13272 - 13572 0 09/02/93
I
I PBTD 1-1 13724'
~
7-5/8" CSG, 29.7#, L-80/13-CR-95, -I 13804'
.0459 bpf , ID = 6.875"
REV BY
DATE
07/13/93
08/11/01
09/05/02
11/24/02
02/22/03
08/28/03
RN/TP
BrvvTP
DTRlTP
?/KAK
/TLH
COMMENTS
ORIGINAL COM PLErION
CORRECTIONS
WA IV ER SAFETY NOTE
GL V C/O
W A IV ER SAFETY NOTE REV .
WAIVER SAFETY NOTE
DATE
11/30103
01/18/04
09/12/04
09/10/04
REV BY COMMENTS
A TDffiP CSG CORRECTION
JR/TLH OA DWNSQZ (08/22/03)
A TDffiP WA IV ER SA FETY NOTE
LDKlTLP SET BAKER IBP
POINT MCIN1Y RE UNIT
WELL: P1-05
ÆRMIT No: 1930870
API No: 50-029-22378-00
SEC 16, T12N, R14E, 1759.29' FEL & 3036.49' FNL
BP Exploration (Alaska)
.
( STATE OF ALASKA (
ALASKA Oil AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed:
AbandonD SuspendD Operation Shutdown 0 Perforate 0 WaiverD OtherD
Alter CasingD Repair WellŒ) Plug PerforationsO Stimulate 0 Time ExtensionD
Change Approved ProgramD Pull TubingD Perforate New Pool 0 Re-enter Suspended WellD
2. Operator 4. Current Well Class: 5. Permit to Drill Number:
Name: BP Exploration (Alaska), Inc. 193-0870
Development ŒJ Exploratory 0
3. Address: P.O. Box 196612 6. API Number
Anchorage, Ak 99519-6612 Stratigraphic 0 Service 0 50-029-22378-00-00
7. KB Elevation (ft): 9. Well Name and Number:
49.70 P1-05
8. Property Designation: 10. Field/Pool(s):
ADL-034624 Pt Mcintyre Oil Field I Pt Mcintyre Oil Pool
11. Present Well Condition Summary:
Total Depth measured 13828 feet
true vertical 9216.7 feet Plugs (measured) None
Effective Depth measured 13725 feet Junk (measured) None
true vertical 9159.3 feet
Casing Length Size MD TVD Burst Collapse
Conductor 80 20" 91.5# H-40 39 - 119 39.0 - 119.0 1490 470
Production 12463 7-5/8" 29.7# L-80 37 - 12500 37.0 - 8435.3 6890 4790
Production 1325 7-5/8" 29.7# 13CR95 12500 - 13825 8435.3 - 9215.0 8180 5120
Surface 4198 10-3/4" 45.5# NT-80 38 - 4236 38.0 - 3567.3 5210 2480
Perforation deDth:
Measured depth: 13056 -13236,13272 -13572 RECE IVE
True vertical depth: 8773.73 - 8883.16,8904.38 - 9073.87 0
Tubing (size, grade, and measured depth): 4-1/2" 12.6# 13Cr80 @ 35 - 12876 JAN 2 0 2004
Packers & SSSV (type & measured depth): 4-1/2" Baker SABL-9 Packer @ 12808 Alaska Oil & Gas Cons. Commission
4-1/2" TRCF-4A SSV @ 2308 Anchorage
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13 Reoresentative Dailv Averaae Production or Iniection Data
Oil-Bbl Gas-Mef Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: 3095 27.2 4859 800 941
Subsequent to operation: 2856 27.4 1910 475 1155
14. Attachments: 15. Well Class after proposed work:
ExploratoryD DevelopmentŒ ServiceD
Copies of Logs and Surveys run - 16. Well Status after proposed work: Operational Shutdown D
OilŒJ GasD WAG 0 GINJD WINJD WDSPLD
Daily Report of Well Operations. ! Prepared by Garry Catron (907) 564-4657.
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
Contact Garry Catron Nt A
Printed Name Garry Catron Title Production Technical Assistant
Signature 564-4657 Date 1/15/04
f~ 8fLJAN z J 100~
Form 10-404 Revised 12/2003 ~
.'
( f
P1-05
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
08/03/03 T/I/O= 970/800n70. Temp hot. MITIA to 3000 PASSED. MITOA to 3000 FAILED. IA FL @
190. (5 bbls). Bled IA from 800 psi to 400 psi fluid to surface. Pressured IA to 3000 psi with
14.5 bbls of diesel. MITIA lost 40 psi in the first 15 min 20 psi in the second 15 min. for a
total of 60 psi in 30 min. Bled lAP to 700 psi down the OA. MITOA Failed. Leak rate @ 10.5
GPM @ 2350 psi. OA FL @ 84'. Started pumping down OA. OAP did not go above 2350 psi.
Established LLR @ 10.5 GPM @ 2350 psi. Total test volume 210 gallons, total test time 20
min. Pumped 20 bbl of diesel total. Bled OAP to 400 psi. OAP or lAP do not have 2" intergal1s,
they are R-24. Final WHP's = 970/650/350.
08/04/03 T/I/O=970/650/350. (Post MIT-IA). Temp hot. No increase in IA & OA from yesterday.
08/05/03 T/I/O=1100/650/300. CIT OA FAILED to 3000 psi. ( Eval for IA X OA Waiver). Established
injection rate of 2.5 bpm @ 2200 psi (Pressure Guage @ Tree) for 55 bbls (22 min). Final
WHP's=11 00/650/250.
08/21/03 Injectivity Test. Int WHP = 480/460/0 Pumped 2.5 bbls. crude down OA caught fluid est. inj.
rate of 3 bpm @ 2100 psi. Pumped 150 bbls. crude down OA to est inj. rate. Bled OA to 50
psi. Recovered 2 bbls. crude Final WHP = 480/460/50
08/22/03 T/I/O = SI/480/0. OA Downsqueeze. RU OS to OA. PJSM. PT lines to 3000 psi. Started
pumping down OA with 20 bbls of DS CW 101 Surfactant. Followed up with 200 bbls of
freshwater 15 bbls of DS CW 101 5 bbls of freshwater spacer 20 bbls of 15.7 ppg Arctic Set 1
cement containing 1/4# per sack of celloflake and 10 bbls freshwater spacer. Displaced
cement to shoe with 120 bbls of crude @ 5 bpm, slowed rate and pumped 2 bbls @ 1 bpm.
Slowed rate to .5 bpm @ 1020 psi. Pumped an addional 3 bbls and OAP increased to 1175
psi. SO and monitored OAP for 10 min. OAP dropped to 950 psi in the first 3 min and
appeared to stabilize out at 900 psi for the remianing 7 min. RD MOL. Checked OAP after RD.
Final WHP's = SI/460/820.
08/24/03 T/I/O= 3100/480/775. (Eval for IAxOA Wav) OA FL @ Surface.
08/24/03 T/IIO = 3100/475/800. MIT - OA FAILED. CIT - OA to 3000 psi PASSED. (Post OA
Downsqueeze). Pressured OA to 3000 psi with 2.3 bbls of Crude. OA lost 200 psi in approx 3
min. Re-pressured OA to 3000 psi 3 more times with the same results. Could not establish
LLR with big pump. Stared CIT -OA. CIT -OA to 3000 psi. Pumped 6.4 bbls of crude to
maintain 3000 psi for 30 min on the OA. Bled OA to 100 psi. Final WHP's = 3100/475/100.
FLUIDS PUMPED
BBLS
35 Diesel
361 Crude
225 Fresh Water
35 DS CW 101 Surfactant
20 Arctic Set 1 Cement
676 TOTAL
Page 1
~. ~ ( ('
1REE= FMC SAFETY NOTES: 4-1/2" CHROMETBG. 7-5/8"
WELLHEA.D= FMC P 1 0 5 CHROMECSG. TBGHGR: Rv1CGEN BPX@35' MD.
AC1UA TOR = BAKER C - ***IAxOA COMM. OPERATING LIMITS: MAX lAP =
KB. ELBJ = 50' 2500 PSI, MAX OAP = 2500 PSI (08/25103
BF. B..BJ = WAIVER)***
KOP = 1332'
Wax Angle = 57 @ 11729'
Datum M) = 13180' 4-112" C'AMOOTRCF SSSV, ID=3.812"
Datum lV D = 8800' SS (I)
I 10-314" CSG 45.5# NT-80 ID = 9.953" I GAS LIFT MANDRELS
, , , ST MD TVD DEV lYPE VLV LATQ-\ PORT DA.lE
1 5180 4134 54 KBMG DMY BK 11/24/02
2 7133 5288 55 KBMG DMY BK 11/24/02
3 12683 8544 54 KBMG DMY BK
7 -5/8" CSG, 29.7#, L-80, ID = 6.875"
--i BAKERCMUSLlDII\G SLV, ID= 3.812" I
Minimum ID = 3.725" @ 12856' I I
4-1/2" PARKER SWN NIPPLE 12812' -1 7-5/8"X4-1/2"BAKERSABL-3FKR,ID=3.88"
--i 4-1/2" PARKERSWS NSCf NIP, ID=3.813" I
4-1/2" TBG, 12.6#, NT -13-CR-80, 4-1/2" TLBII\G TAIL, WLEG, ID = 4.0"
.0152bpf, ID= 3.958" B..MDTTLOGGED08/12/93
ÆRFORA 1l0N SUMML\RY
REF LOG: COR 0 N 0718/93
ANGLE AT TOP PERF: 51 @ 13056'
Note: Refer to Produetion DB for historieal r erf data
SIZE SPF INlERVAL Opn/Sqz DATE
3-3/8" 6 13056 - 13236 0 09/02/93
3-318" 6 13272 - 13572 0 09/02/93
I PBW I 13724'
7 -5/8" CSG, 29.7#, L-80/13-CR-95,
.0459 bpf , ID = 6.875"
DA lE REV BY COMMENTS DATE REV BY OOMMENTS PONT MCNTYRE UNIT
07/13/93 ORIGINAL COMPLEfION 11/30/03 ATD'TLP CSG CORRECllON WELL: P1-05
08/11/01 RN/lP CORRECllONS PERMIT t\b: 1930870
09/05/02 BM/lP WAIVER SAFETY NOTE API t\b: 50-029-22378-00
11/24/02 DTRffP GLV C/O SEe 16, T12N, R14E, 1759.29' FEL & 3036.49' FNL..
02/22/03 ?/KAK WAIVER SA FETY NOTE RBJ.
08128/03 /TLH WAIVER SAFETY NOTE BP Exploration (Alaska)
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO:
THRU:
FROM:
Julie Heusser, Vi DATE:
Commissioner
John H Spaulding,
Petroleum Inspector
April 10, 2001
SVS Tests
BPX PBU
LGI & PM-01
April '! I, 200!: I traveled to BPX's Lisbume Gas Injection (LGI) and also on to
the Point Mclntyre PM-01 location to witness Safety Valve Testing. The AOGCC
SVS test reports are attached for reference.
As noted 3 failures were observed on both pads; with 2 being repaired and
retested immediately. The third failure a sssv and will need further attention.
Mark Wysocki, lead operator was training 2 new hires. The crew did an excellent
job.
Summary: ! witnessed the SVS tests on LGI and PM-01
LGI, 3 wells, 9 components, 1 failure, 11% failure rate
PM-01, 11 wells, 33 components, 2 failures, 6% failure rate
Attachment;
Svs bpx Igi 4-10-0 ljs
Svs bpx prn-01 4-10-01js
Nq,n con.f, iden,,.ti,.a!
Alaska Oil and Gas Conservation Commission
Safety Valve System Test Report
Operator: BPX
Operator Rep: M~., ,k,.W.,,ysocki
AOGCC Rep: John H. SEaulding
Submitted By: John, Spaulding_ Date:
Field/Unit/PM: Pt Mcln .ty_re/PBUfPM-0! , ,,
Separator psi: LPS 460 HPS
4/9/01
I I Il I I I In . II _ Il I I [ I I .I I I[.. Il
ii i ] I i
WeB Pemit Separ Set L~ T~t Test T~t Date ~, WAG, G~J,
.Number Number PSI PSI Trip Code Code C~de Passed G~ orCyCLE
~12 191O370
plo: ' lSS00~o
:P~-o~1~b01~0 .... 4~0 ~0~ ~10~ p ~ '"
~9i-04i~o~o '" ~0 '700 ..... 700 ,p ~ ~...... 0~
P1~6~ ' ' ~%1~70 'ua0'700a7~ ' p 9 ' 'g ..... 0~
~P~-07~s91~no
~Pi'-08'"~9~o98o' 4a6"'~5oo .... ~2oo" 'gp ' 'b "
P 1-09 1961540 4~ 350 300 p P P OIL
pI-ll' '' 1920860~ "460 350' 250 P ....P '~ .... ~IL
,,, , ~
pi,.~2 ..... i,9i.of36~
Pl-]3' 19'30740 460 ..... 15~ ''1'150 P '" p p ........... OIL
PI-~ ...... 1930510 ' 460 " 350 280 p p ' '~ " OIL
Pi~2~ " 19209~0 ~60 " 3~0 17~' " 3 P ' P ' '~/9701 oi~
:p~.2~ .... ~96i240 .................
P1~24" 1961490] ........
P~-G1 ..... 1'921~0! 3660 2906 "~56 P P P G~J
, ~ , , .... , ~, , .....
, , , ,, , _t ,, ,, , , , ,t , ,
Wells: 11 Components: 22 Failures: 2 Failure Rate: 9.09% I-'l 9o Day
Remarks:
P1-08 & P1-3 were choked back,_ hence the .tfigher pil.o_.t se.tt.'mgs'
P 1-20 pilot reset and._retested .................
RJF 1/16/01 Page 1 ofl 010409-SVS PM-01 PBU-js
Alaska Oil and Gas Conservation Commission
Safety Valve System Test Report
Operator: BPX
Operator Rep: Mark Wysocki
. .
AOGCC Rep: JohnH.~Sp..au!~'m,g'
Submitted By: John Spaulding
Field/Uffit~ad: -Lisburne/PBU/LGI
.... , ,, .,
Separator psi: LPS
Date: 4/9/01
HPS
Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GI~J,
Number Number PSI PSI Trip Code Code Code Passed GAS or CYCLE
LGI-02 18~1400 3800 29001 2300 i~ e P 4/9/01 GINJ
LGI-04 1880130
LGI-06 1860670 3800 2900] 2500i P P P GINJ'i
LGI-08 18605;/0 ............
LGI-10 '1860690 3800 26001 2300 e P e ' " GINJ
, ,
LGI- 12 1860540
Y?ells: 3 Components: 6 Failures: 1 Failure Rate: 16.67oA~ 9o Day
Remarks:- ~ LGI-02 Pilot tripped to .low and was re.se,t.-ret .e?ext, and.passed
RJF 1/16/01 Page 1 of l 010409-SVS LGI Lisbume-js
P E }'i iq I T D;~,'" 'F A T
.... ::, 887
93 08TM,'
o~ 007
93--'087
93'~087
93 "-087
93 -' 087
o 3 '" 08 '7
93 ---08 '7
93 .... (387
93
0 /
93 '-' 087
9.3 .... (.) 8 ?
~ 8 i 0
5 8 'i 2
4 0 7
DAIL. Y W,5'.L.L. OP
S I...I R V E Y
(~ [~l ¢ij ~ / Il ~l ~ L
:.CDN--[lWD/DC
c r::, F.': -~ L '¢/i.?, / D C
C [:5 l~ 'l~ ',,i E R i; L W O / D C
CE'F W,/J WL
GCT
F' K F: F ( 8/' ?. 0/" 9 3 )
P E R F ( o /
,;., 31/93)
p i-.:.. R F ( 9 / 0 2 / 9 ~ )
STAT(
PRES/TEHP/
~12900--i3181
'i
l"l/.',l., '[ [:il ltl:; r' ,'. '.,./
III / I ~.{) / i ?] f~ll Ill
'" j 9('}:i
i 0/" i 1 / ,
'i0,/'1 'i./'i993
10/" i i,. ,
i i)/" '1 i/' 1 !) !ii ii.'.
i 1i/"'l i,/ t992,
'i i,' 'iq /ic
.., /,. .. ,J.,
fl. ,.o,/, ,."~. ?./' i .a::, 93
0 :::', / 'i 'i ,.'
O. 3/ '1 i/' i 9 ,.~o /.~
0 ;:',/.' , ......
·
ri":' 2. 3 'J 9q:,~
., ,.; ,/!" // ,.
I '1/'i ~:,/' 1993
i i/' i..q,, ..... I..:.q.c3
'i il i l::i /' i ~: q :)
.,
. ,
1 J/'1:J/''J¢)93
('),."":, ./'"...- .".~ ,,,: i .::.,;':' ..q. 2,
i '" "'"~ i 99
'J 'J ./ '1 c.,/' .j q
.:..,.._~. i:.~J !}
:[ i'~ ',/' e r'~ 'L o r" y
13, AT>', T O-'"~TA PLI!S
,., .... r'y
W a s 'E h e
Ar'e we1 1 tests
Wel'i 'i's '¥n
: a m .o 'j e s r" e q u :~ r'-. e.. d '?. y e s _~; ,,...,,"' n d
.
~,~,, ~:.¥'...~ 'j 'i ~}; (:) ,'" ~ ,'~''''~ ~" ~.~~
... ~ y e s _! a i y s 'i :is & d e s c' r' ~ i' v e ,:. ! ?
r' e q ,..~ 'i r' e ': :i ~ e s ~}' i:.': e c e -¥ v e d9 ~ i", o
c o.rn p I i a n c e . ~i~ I
Date:
Subject:
From:
To'
ARCO Alaska Inc.
Greater Point McIntyre Engineering
March 7, 1994
Transmittal Number 703
ARCO Alaska, Inc.
Bob Crandall
AOGCC
3001 Prokupine Drive
Anchorage, AK 99501
The following Greater Point McImtyre Area data are enclosed. This information is confidential
and your cooperation in maintaining confidentiality is appreciated:
fP1-05
/ST1
~P1-05
VST1
I1-08
/p -08
~..ST1
c~2~1_11
~" P1-20
P2-06
Final Log: CDR~ Ev_h_*need Resisdvi~,
LWD/._.~..~.R~h Corrected__._
Final Log: C~DR LWD/Depth Correc.___~ted
~) 7/8-9/93 Schlumberger /
Izq ~--- ~ %~o 5
7/8-9/93 Schlumberger /
Final Log: CDN LTD/Depth Corrected (~
~tR oo -- /%%oo
FINAL Log: CDR* Ver Enid Rosi.~tivity
F~AL Log: 0rue Vertigal Depth~DR ~
Tape: ~ Edit~Ny ~ 5 bit
runs w/Verification Listing ~ ~2&
Tape: ~ Edit ~n 2 ST bit
runs (with original Well) LDWG Format
P~n Log:
FBS/TE~/PREgS/G~DIO/~~
Emduc¢on L~g:
~S./~3.~/PRE~G~~
Log: P~ducfion L~
F~/Temp/Pr~ ~ s / Gradio/~
LOG:Production L~
FbS/TE~/PRESS/Gradio/~
Final Log: GYRO Directional Survey (G~ ~
7/8-9/93
2%5
Schlumberger/
~-~ 7/18-28/93 Schlumberger
7/18-28/93 Schlumberger
~-
7~24/%
Schlumberger
7/18/% Schlumberger
12/11/93 Schlumberger
12/11/93 Schlumberger
~ 12/12/93
ct000 - l o~ oO S"
Schlumberger
12/12/93
~ttmo-~t~o 5"
Schlumberger
1/7/94
Schlumberger
Well
Name
P2-30
i,~-So
P2-30
P242
P2-42
P2-42
P2-42
p~2P2-51 -51
Data Description
FINAL LOG:~Compensated Neutron Log (Dual
Porosity - CNT-G)
Run # Date Run
~ 1/8/94
FINAL LOG: D_ual B_u, r_st TDT-P (~ 1/8/94
I o'~--o0- ~. D~2.0
1/17/94
"FINAL LOG: Perf Record 3 3/8 .... ~H, 6SPF"__
"FINAL LOG:V~erf Record 270' 3 3/8 .... 6 SPF"
/~IS Tape:c~n~l ./C'N/ZDL_~k~: 7500-10564 w/lis
verification -l& L~O,Ta~
FINAL LOG: V~ement Bond Log (CBT-GR)
FINAL LOG: Cement Evaluation Log (CET-GR)
Company
Schlumberger
Schlumberger
Schlumberger
(~ 1/16-17/94 Schlumberger
qqsD .- loq, z,W 5 ''
v"Compensated Neutron Log (Dual Porosity-
CNT-G)
1/9/94 Atlas
't~ual Burst TDT-P Log
1/15/94 Schlumberger
q~t,o - i t~ bq 5'~
1/15/94 Schlumberger
1/11/94 Schlumberger
l:k~cr- I'b~ ~"
(~) 1/11/94 Schlumberger
Please sign
and return to: Elizabeth R. Barker,ARCO Alaska, Inc. ATO-415
P.O. Box 100360
Anchorage, ~aska 99510-0360
PLEASE SIGN ONE COPY AND RETURN
Transmittal Number: 703 Page: 2
ALASKA OIL & GAS CONSERVATION COMMISSION
Attn. LARRY GRANT
3001 PORCUPINE DR.
ANCHORAGE
AK, 99501. USA
Date: 24 February 1994
RE: Transmittal of Data
ECC #: 6136.00
Data: CN/GR
Dear Sir/Madam,
Reference:
BP
R-35 (23-33-12-13)
PRUDHOE BAY
NORTH SLOPE, AK
Enclosed, please find the data as described below:
Tapes/Diskettes:
Sent by U.S. MAIL
c~pN/GR LDWG TAPE+LIST
Run ~ 1
Please sign and return to: Atlas Wireline Services
Petrophysical Services
5600 B Street
Suite 201
Anchorage, AK 99518
Attn. Rodney D. Paulson
Received by:
Date:
ARCO Alaska, Inc.
Lisburne/Point McIntyre Engineering
Date: December 2, 1993
Subject: Transmittal #367
From:
To:
ARCO Alaska Inc.
Bob Crandall
A~C
3001 Porcupine Drive
Anchorage, AK 99501
The following Point McIntyre data are enclosed. This information is confidential and your
cooperation in maintaining confidentiality is appreciated·
·
Well Log
~O-~.7 1 blueline 1 sepia I~ZO- 1~'7~L¢ ,5"
~ P1-01 Perforation Record 2-1/8'' BH ENERJET
q5--.~5'~ P1-05 -'Static Pressure Survey ~PRESS/TEMP/GR/CCL)
...~ /PI~VL~ Vew'Enhanced Resistivity CDR
.2 u
·
?-7-~~~v'LWD True Vertical Depth CDR ~- t¢~ % 5 cml~
~erforafion Record 3-%" HSD -4lB q~oo-to2.5o) $" 1
~/Perforafion Record 3-%¢ HSD -4lB ~ooo-.-.105~o¢ ~" 1
~'Data Frac Log fl'?0o -'lbZSO~ 5" 1
¢Cement Evaluation Log (CET-GR) ~o-~v42.5, 5" 1
,'Cement Bond Log (CBT-GR) ~oo-10~0o 5,' 1
¢Cement Evaluation'Log (CET-GR) xl7z-qz~o~ ~. I
IP1-17
IP1-17
P2-1
6
/ ~P2-16
Run # Run Date Company
1 11/3-4/93 Schlum~r~
1 ~z~0~ 93 Schlum~
7/18-28~93
7A8-28/93
n/26/93
11129193
n/07/93
~0/24/93
~0/24/93
10/24/93
,-~c~!P2-57
:::~P2-57
/P2-60
-
1P2-60
,/Cement Bond Log (CBT-GR) ~llz-qz2~, s" 1 10/24/%
,, '--'- .... ..... °
/
~Compensated Neuron Log (2.5" CNT-D/~
'11/14/~3
~Perfora~on Record (~/~ Gun 4lB ~) 1 11/14[.93
O-ISoo0,
~tadc Press~e S~ey ~SS/~~/GR/CCL)tgStl
~erforafion Record ~/~' 4lB ~ ~q~ ~m¢, 5"1 11/14/93
PLEASE SIGN ONE COPY AND RETURN
Transmittal #367 (AOGCC) .. .... .
Page 2
Well Tape/Diskette w/verification oft '~ 5qT"~t Run # Run Date Company
PI~T#1 C__~~t~!)_Data in 2 ST Bit Runs (w/Orig. Well) 4~ ! 7/18/93_ Sddum,har~
P1-16 'Dual PropResis/Neu/Dens/GR-Depth Shifted°t* ~'~24~3/~9%~'%~/93 Bal~-I~ghes~5 ~
P1-21 Dual PropResis/Neu/Dens/GR-Depth Shifted~ 3z6
q%'/[5 P2-12
~/P2-16
P2-16
P2-46
P2-46
Final MWD ~t vcb&k~. -
DIFL/GR, CN/ZDL/GR (LDW~ Tape & Disk~kette) - ,
Final MWD
DIFL/CN/ZDL/GR (LDWG Ta~e & Disk~tte) ,ct5 -
k~k 5q2,?., c~q~$-q z~3' _
Final MWD
8/31/93 Schlumbeq~
9/13/93 Atlas
9/11/93 Sd'dum~
9/27/93 Atlas
9/26/93 Sd'duml:~m~
Please
sign -~~~~ and return to:
Laura S. Lahrson, ATO-409
ARCO Alaska, Inc.
P.O. BOX 100360
Anchorage, Alaska 99510-0360
..
Transmittal #367
PLEASE SIGN ONE COPY AND RETURN
INDIVIDUAL WELL GEOLOGICAL INVENTORY REPORT
PERMIT DATA DETAIL
10/14/1993
PAGE: 1
93-087 CBT W/JWL
93-087 CET W/JWL
93-087 GCT
93-087 SBT/GR/CCL
93-087 407
93-087
DAILY WELL OP
93-087 SURVEY
93-087 SURVEY
93-087 SURVEY
R1,5",12630-13663
R1,5",12630-13687
R1,35-13650
R1,5",12794-13690
COMP DATE:09/02/93
06/15/93-07/13/93
ANADRILL
ANADRILL
SS DIRECTIONAL
SUMMARY
Are well tests required?
was well cored? Yes No
Yes No
If yes, was the core analysis & description received?
Are dry ditch samples required? Yes No
Yes No
WELL IS IN COMPLIANCE.
INITIAL
COMMENTS:
Date:
Subject:
From:
ARCO Alaska, Inc.
.... -~sburne/Point McIntyre Engmeerh~g
November 17, 1993
Transmittal #361
ARCO Alaska Inc.
To:
Bob Crandall
AOC~C
3001 Porcupine Drive
Anchorage, AK 99501
Enclosed are sepias for the following Point McIntyre logs. These sepias were erroneously
omitted from Transmittal #359, sent 10/13/93. This information is confidential and your
cooperation in maintaining confidentiality is appreciated.
Log
Well Title Run # Run Date Company
1 sepia
P1-04 Completion Record, Perforation HSD 6 s~p 33/8'' I 8/19/93 Schlumber§er
t P1-05 /Perforating Record 3%" HSD 4lB HJ ti RDX I 8/23/93 Schlumberger
P1-05 ,/'Perforating Record 33/8'' HSD 41B HI Ii RDX I 8/30/93. Schlumberger
P1-05 v'Perforating-Record 3%8" HSD 41B HI II RDX I 8/31/93 Schlumberger
1-05 x/Perforating Record 3%"HSD 41B HI 11RDX I 9/01/93 Schlumberger
1-05 x/Perforating Record 3%8" HSD 41B HI II RDX I 9/02/93 Schlumberger
P1-08 ,./Integrated Formation Log-MD - 7/19-24/93 Exlog
P1-08 ,/Integrated Formation Log -TVD - 7/19-24/93 Exlog
P1-08 ,/Engineering Parameters -MD - 7/19-24/93 Exlog
P1-08 v'Pressure Data Log-MD - 7/19-24/93 Exlog
,/Pi-08STI' Integrated Formation Log -MD
v'P1-GSST1 Integrated Formation Log-TVD
v'PI-08ST1 Engineering Parameters-MD
7I'~I-~ST1 Pressure Data Log-MD ·
- 7125-31/93 .~ Exlog
- 7125-31/93 Exlog
- 7125-31/93 Exlog
- 7125-31/93 Exlog
Pl-13 ,/'Integrated Formation Log-MD
Pl-13 v' Integrated Formation Log -TVD
P1-13 ,/Engineering Parameters -MD
P1-13 v'Pressure Data Log-MD'
6/1-11/93 Exlog
6/1-11/93 Exlog
6/1-11/93 Exlog
6/1-11/93 Exlog
IPl-17 /integrated Formation Log -MD
0~_~\,~, [Pl-17 v/Integrated Formation Log-TVD
/P1-17 v/ Engineering Parameters -MD
|P1-17 ,/Pressure Data Log-MD
- 4112-16/93 Exlog
- 4112-16/93 Exlog
- 4112-16/93 Exlog
- 4/12-16/93 Exlog
PLEASE SIGN ONE COPY AND RETURN
Transmittal #361 (AOGCC)
Log
Well TiQe
1 sopia
O~.)/~o~]P1-21 ,,/Inte~ated Formation Log-MD
P1-21 V' .Integrated Formation Log -TVD
P1-21 ¢Engineering Parameters -MD
P1-21 ,/Pressure Data Log-MD
P2-06 ~Z-Densilog/Cmpnstd NEUT~ON/GR/Caliper
P2-06 x/Dual Laterolog/Gamma Ray/SP
P2-06 ,/Sub-Sea Vertical Depth (Single Shot Data)
P2-06 ,/Borehole Profile
P2-16
P2-16
P2-16
P2-16
v'Z-Densilog/Cmpnstd NEUTRON/GR/Caliper 1
v/Dual Induction Focused Log/Gamma Ray 1
,/Sub-Sea Vertical Depth (Multi Shot Data) 1
7'Borehole Profile I
P2-46 ,/Z-Densilog/Cmpnstd NEUTRON/GR/Caliper 1
P2-46 v/Dual Induction Focused Log/Gamma Ray 1
P2-46 ,/Sub-Sea Vertical Depth (Directional Drlg Data) 1
P2-46 ~q3orehole Profile 1
Run # Run Date
- 4/30-5/5/93
- 4/30-5/5/93
- 4/30-5/5/93
- 4/3O-5/5/93
8117/93
8117/93
8117/93
8117193
9/t3/93
9/t3/93
9113/93
9113193
9127193
9127/93
9127/93
9127193
Company
Exlog
Exlog
Exlog
Exlog
Atlas
Arias
Atlas
Atlas
Atlas
Atlas
Atlas
Atlas
Arias
Atlas
Atlas
Atlas
Please sign /d~./~?flj.~/~ and return to:
Laura S. Lahrson, ATO-409
ARCO Alaska, Inc.
'P.O: BOX 100360 '
Anchorage, Alaska 99510-0360
Transmittal #361
RECEIVED
NOV 79 1993
~Jaska Oil & (~as Cons. Commission
Anchorage
PLEASE SIGN ONE COPY AND RETURN
Date:
Subject:
From:
October 13~ 1993
Transmittal #359
ARCO Alaska Inc.
.... ARCO Alaska, Inc .... ~
~burne/Point Mclntyre Engineeri ..
To:
Bob Crandall
AOC~C
3001 Porcupine Drive
Anchorage, AK 99501
The following Point Mclntyre data are enclosed. This information is confidential and your
cooperation in maintaining confidentiality is appreciated.
Log
Well Title ' Run # 'Run Date
P1-04 .Completion Record, Perforation HSD 6 sfp 3,,%8" 1 8/19/93
x'.3 ~OTo-I~o~' -~
P1-05 Perforating Record 3%8" HSD 4lB H}' II RDX''~'', 1~z~'' 18/23/93
P1-05 Perforating Record 3%8" HSD 4lB I-~ II RDX-- ~' 1 ~ '] 8/30/93
P1-05 Perforating Record 3%8" HSD 4lB HJ II RDX-m°', le0t~'-~8/31/93
P1-05 Perforating .Record 3%8".HSD 4lB HJ II RDX" S"j 1~,.~9/01/93
P1-05 Perforating Record 3%8" HSD 41B,...~I-~i :z~-~ ~-1%~ ~t ~II RDX ?~ .~-'~__ 9/02/93
~ -
P1-08 Integrated Formation Lbg ~)Z ~mo- loo°~l~;z'~ 7/19-24/93
P1-08 Integrated Formation Log~ (~2~--B77;.~ - 7/19-24/93
P1-08 Pressure Data Log-MD I"~ ~ - ,~?~' - 7/19-24/93
Company
Schlumberger
Schlumberger
Schlumberger
Schlumberger
Schlumberger
Schlumberger
Exlog
Exlog t~
Exlog
Exlog
.08 PI438S~1' Integrated Formation Log ~-~'~ ~'/o-to'~e~' _ 7/25-31/93
PI-CBSt'I Integrated Formation Log ~2"~ ~O--~76o/ 7/25-31/93
Engineering Parameters 7~~"~ ~?~-. leqco' 7/25-31/93
Pressure Data Log-MD !'~ ~31P-~ .S?~5' - 7/25-31/93
Exlog
Exlog
Exlog
Exlog
IPI-13 Integrated Formation Log-~ 2", ~oo-lloo5 _ 6/1-11/93
Pl-13 Integrated Formation Log___'~ Y-"~ t~4o-w?q5 6/1-11/93
Parameters
]Pl-13 Engineering , - 6/1-11/93
IPl-13 Pressure Data Log-MD ~" co~ -- ~,-~o - 6/1-11/93
Exlog
Exlog
Exlog
Exlog
Pl-17 Integrated Formation Log 4~__ ?'i, 7~0o-Io~2. - 4/12-16/93
Pl-17 Integrated Formation Log -~).2 ~ 7~soO- ~2. 4/12-16/93
Pl-17 En~~g P~et~s ~ ~", 7~ ~~ 4/12-16/93
Pl-17 Press~e Data Log-MD ~"
~ o~o- ~Z~v - 4/12-16/93
Exlog
Exlog
Exlog
Exlog
PLEASE SIGN ONE COPY AND RETURN
, ransmittal ft359 (AOGCC) -' Page 2
Log
W'ell Title
1blue line
P1-21 Integrated Formation Log ~~-
P1-21 Integrated Formation Log
P1-21 Engineering Parameters ~D -
P1-04
P1-05
P1-05
P1-05
Run # Run Date Company
4/30-5/5/93 F_xlog
·- 4/30-5/5/93
4/30-5/5/93 Exlog
P1-21 Pressure Data Log -MD'"' - 4/30-5/5/93 Exlog ~" ~:~ -- q~co'
'P2-06 Z-Densilog/Cmpnstd NEUTRON/GR/Caliper -~'> ~.~S"~ ll,4oc-.
8/17/93 Atlas
.P2-06 Dual Laterolog/Gamma Ray/SP ' 1 8/17/93 Atlas 2-~S'~
P2-06 Sub-Sea Vertical Depth (Single Shot Data)--.x.1 8/17/93 Atlas
iP2-06 Borehole Profile 1 8/17/93 Atlas ~5 I~-)-~' x tq0o--
~ ~tq0o - h-t%~ ~ I0o7. 0r9/13/93~o~t,, Atlas
P2-16 Z-Densilog/Cmpnstd NEUTRON/GR/Caliper/7~ ~.~
P2-16 Dual Induction Focused Log/Gamma Ray 1 9/13/93 Atlas
P2-16 Sub-Sea Vertical Depth (Multi Shot Data) 1 9/13/93 Atlas
P2-16 Borehole Profile 1 9/13/93 Atlas
P2-46 Z-Densilog/Cmpnstd NEUTRON/GR/Caliper g~l' 9/27/93 Atlas
P2-46 Dual Induction Focused Log/Gamma Ray 1 9/2~/93 Atlas
P2-46 Sub-Sea Vertical Depth (Directional Drlg Data)~._"~1> 9/27/93 Atlas
P2-46 Borehole Profile 1 9/27/93 Atlas I+~"~
Diskette/Tape (w/verification listing)
Well Title Run # Run Date Company
GCT diskette-Complete Calc. V' 1 7/28/93 Schlumberger
GCT diskette-Complete Calc.v~ 1 8/_12/?_3 Schlumberger
cr> /crm h, mt
P1-08
?'5..:7q IPl-13
,; %- 5[ ] Pl-17
P2-06
c~5-t0~ P2-06
P2-06
CDN/CDR in 3 Bit Runs (O__H EdiO,/ ctq$~tt ~ ~f~19
mVD -
CDR/GR'Only in 5 Bit Runs (OH Edit) P~lS/°qw"i~°
Dual Prop Resis/Densitv/Neutron/GR w/listing 5-7
Final M-WD w/Listing + ~ -
Final M'WD ~/Listing'r'cl~ -
Final MWD w/Listing*~ -
Final MWD w/Listing ~-~ d -
CDN/CDR in 3 Bit Runs (O_~ Edit)~St[/%~--liqT/~, 5 1
DLL/CN/ZDL/GR in LDWG Format w/Listing 1
~::~lq ott' t~qoo -tt '7 8(o
6/27/93
7/13/93
7/24/93
6/6/93
6/07/93
4/16/93
4/16/93
8/17/93
8/17/93
8/17/93
Schlumberger
Schlumberger
Schlumberger
Baker Hughes
Baker Hughes
Baker Hughes
Baker Hughes
Baker Hughes
Schlumberger
Atlas
PLEASE SIGN ONE COPY AND RETURN
Transmittal #359 (AOGCC)
Page 3
Report
Well
P1-04
P1-05
P1-08
Pl-13
PI-I~
Title
Sub-Surface Directional Survey (2 copies)v/
Sub-Surface Directional Survey (2 copies)
Final Well Report ~"
Final Well Report
Final Well Report,'"
Final Well Reportw
Date
7/28/93
8/12/93
7/19-8/1/93
6/1-11/93
4/12-16/93
4/30-5/5/93
Company
Schlumberger
Schlumberger
Exlog
Exlog
Exlog
Exlog
Please
and return to:
'Laura S. Lahrson, ATO-409
ARCO Alaska, Inc.
P.O. BOX 100360 ·
Anchorage, Alaska 99510-0360
Please note: The Exlog blueline logs are located within the Final Well Report binders.
Transmittal #359
PLEASE SIGN ONE COPY AND RETURN
STATE OF ALASKA
ALASKA L)iL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMP LETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permil Number
ARCO Alaska,/nc. 93-87~r,~,(~
3. Address B. APl Number
P. O. Box 196612, Anchorage, Alaska 99519-6612 so- 029-22378
4. Location of well at surface
~ 9. Unit or Lease Name
1457'NSL, 695' WEL, SEC. 16, T12N, R14E i' i Point Mclntyre
V~1~~_ . ~ P1_05
At Top Producing Interval i:'.i i'~r 10. Well Number
2209'NSL, 2445' WEL, SEC. 14, T12N, R14
;~?I-~.~ 11. Field and Pool
At Total Depth ~'"-~--'-- -~ ' Point Mclntyre
2242' NSL, 1758' WEL, SEC. 14, T12N, R14~
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No.
KBE = 49. 7' ADL 34624
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, il ollshore 16. No. of Completions
6/14/93 7/7/93 9/2/93J N/A feet MSL One
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 120. Depth where SSSV set 21. Thickness of Permafrost
13828'MD/9218' TVD 13725'MD/9159' TVD YES [] NO []I 2308' feet MD 1750'(Approx.)
22. Type Electric or Other Logs Run
MWD
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.5# H-40 41' 121' 30" 280 cuft Arcticset(Approx.)
10-3/4" 45. 5# N T-80 41' 4236' 13-1/2" 2563 cuft "E"/406 cuft Class "G"
7-5/8" 29. 7# L-80/13CR 37' 13804' 9-7/8" 801 cuft Class "G"
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
Gun Diameter 3-3/8" 6 spf
MD TVD (Subsea) 4-1/2" 128 76' 12808'
13056'- 13236' 8724'-8832' 13CR80
13272'-13572' 8854'-9024' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze protected wi60 bbls diesel
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lilt, etc.)
Not on production N/A
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO
TEST PERIOD ~
I
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips, and presence ol oil, gas or water. Submit core chips.
R'E E V[D
O0T 1 1
,.&iaska 0il .& Gas Cor~s. 6ommissio~
/ nchorage
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29. ~ 30. I(
GEOLOGIC MARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPlH TRUE VERT. DEPTH GOR, and time of each phase.
Subsea
HRZ 12890' 8610'
Kalubik 12983' 8668'
Kuparuk 13662' 9062'
REC?EIVED
OCT 11 1993
Alaska Oil & G
as Cons. Commission
31. LIST OF ATTACHMENTS
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Si9~~ t,. L - T itie Qcilling Engineer SuoelVisor Date 10 - r ( ~ 7
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24 : If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
BP/AAI SHARED SERVICE
DAILY OPERATIONS
PAGE: 1
WELL: P1-05
BOROUGH: NORTH SLOPE
UNIT: POINT MCINTYRE
FIELD: POINT MCINTYRE
LEASE:
API: 50-
PERMIT:
APPROVAL:
ACCEPT: 06/14/93 07:00
SPUD: 06/15/93 03:00
RELEASE:
OPERATION:
DRLG RIG: POOL 7
WO/C RIG: POOL 7
06/15/93 (1)
TD: 280'( 0)
06/16/93 (2)
TD: 1725' (1445)
DRLG. MW: 8.6 VIS:300
MOVE RIG. RIG ACCEPTED @ 19:00 HRS, 6/14/93. N/U
DIVERTER. MIX SPUD MUD. TEST DIVERTER. P/U BHA #1. SPUD
WELL @ 03:00 HRS, 6/15/93. DRLG F/ 56'-280'.
DRLG.
DRLG F/ 280'-544'
MW: 9.0 VIS: 80
SHORT TRIP. CIRC. DRLG F/ 544'-1725'.
06/17/93 (3)
TD: 4260' (2535)
06/18/93 (4)
TD: 4260' ( 0)
06/19/93 ( 5)
TD: 4883' ( 623)
06/20/93 (6)
TD: 7303' (2420)
06/21/93 ( 7)
TD: 7887' ( 584)
06/22/93 ( 8)
TD: 8456' ( 569)
06/23/93 (9)
TD: 9468' (1012)
POH TO 3414' MW: 9.4 VIS: 0
DRLG TO 3022' CIRC POH TO 1700', RIH TO 3022', DRLD TO
, ,
4260', CIRC, POH TO 1000', RIH TO 4260', CIRC, POH TO 3414'
RIGGED UP BOPE MW: 9.2 VIS: 0
POH, PLANNED MAINT. SERV CSG HANDLING EQUIP, RUN 10-3/4"
CSG TO 4236', CMT W/460 BBLS LEAD CMT, 72 BBLS SLURRY, 400
BBL TAIL, SERV CSG HNDLG EQUIP, REPAIR WELLHEAD, CMT TOP
JOB, NU BOPE
DRLG. MW: 9.1 VIS: 38
M/U BOPE. TEST BOPE. RIH TO 4154'_ CIRC__ TEST CSG.
DRLG CMT TO 4070' CIRC. FIT (14.8 PPG EMW) . DRLG TO
4883'
POOH. MW: 9.5 VIS: 68
DRLG TO 5259' CIRC. SHORT TRIP. DRLG TO 6279' CIRC.
SHORT TRIP. DRLG TO 7303' CIRC. SHORT TRIP.
DRLG.
SHORT TRIP. DRLG TO 7583'
RIH. CIRC. DRLG TO 7887'
MW: 9.5 VIS: 90
CIRC. POOH. CHANGE BIT.
POH TO 4400' MW: 9.4 VIS: 0
DRLD TO 7994', CIRC, WASH & BACK REAM TO SHOE, BHA RUN #4,
SERV TOP DRIVE, RIH TO 7656', DRILD TO 8456', CIRC, POH TO
4400'
DRLG @ 9468' MW: 9.4 VIS: 0
BHA RUN #4, POH TO 150', BHA RUN #5, RIH TO 8456', WASH &
REAM F/8200'-8456', DRLD TO 9468'
WELL : P1-05
OPERATION:
RIG : POOL 7
PAGE: 2
06/24/93 (10)
TD: 9870' ( 402)
06/25/93 (11)
TD:10856' ( 986)
DRLG TO 9870' MW: 9.6 VIS: 52
BHA #5 DRILLED TO 9646', ROP DROPPED F/70' TO 40'/HR, DRILD
& SURVEY F/9468'-9646', CIRC, BHA RUN # 6 RIH TO 9646',
WASH & REAM 8460'-9646, DRLD TO 9870'
DRILLING MW: 9.6 VIS: 54
DRLD TO 10412. RIH, REAM TO BTTM. DRLD TO 10856.
06/26/93 (12)
TD:ll146' ( 290)
06/27/93 (13)
TD:ll600' ( 454)
06/28/93 (14)
TD:11655' ( 55)
06/29/93 (15)
TD:11655' ( 0)
06/30/93 (16)
TD:11655' ( 0)
07/01/93 (17)
TD:11225' ( 0)
07/02/93 (18)
TD:l1712' ( 487)
07/03/93 (19)
TD:12300' ( 588)
DRLG.
DRLG TO 11081'
11146'
MW: 9.6 VIS: 54
CIRC. POOH. CHANGE BHA. RIH. DRLG TO
DRLG.
DRLG TO 11551'
11600'
MW: 9.7 VIS: 54
CIRC. POOH. CHANGE BIT. RIH. DRLG TO
CIRC. MW: 9.7 VIS: 57
DRLG TO 11655'. STUCK PIPE. WORK PIPE. ATTEMPT TO ROTATE
& CIRC. R/U ATLAS. RIH W/ SOS OVERSHOT. RIH W/
FREEPOINT. FREE @ 11416' RIH W/ STRING SHOT. BACKOFF.
CIRC. R/D ATLAS. POOH.
FISHING MW: 9.8 VIS: 0
POH W/E-LINE, CBU, POH, SERVICE WEAR RING, M/U FISHING
TOOLS, RIH, CIRC & COND MUD, SCREW INTO FISH, JAR 2 LICKS
UP & 30 MINS DOWN
RIH TO LAY CMT PLUG MW: 9.9 VIS: 57
JAR ON STUCK PIPE @ 11413' PERFORM BLIND BACK OFF, R/U W/L
,
& RIH W/STRING SHOT, FIRE SHOT @ SCREW IN SUB, BACKED OFF,
POH W/W/L, CIRC, POH, SERV TOP DRIVE, RIH TO LAY CMT PLUG
W/5" DP
DRLD CMT F/11168'-11183' MW:10.0 VIS: 65
RIH TO 6000' TO LAY CMT PLUG, CIRC @ 11413', PUMP 44 BBLS
CMT, POH TO 10000', CIRC, POH, TEST BOPE, RIH W/BHA #11 TO
SHOE, SERV TOP DRIVE, RIH TO 11168', WASH & REAM
F/10559'-11168', DRLG TO 11225'
BACK REAM F/11712'-11072' MW: 9.8 VIS: 68
DRLD TO 11712', CIRC, POH TO 1000', BACK REAM
F/11712'-11072'
NOTE:ACCUMULATED COST IS $2,450,598
DRLG. MW: 9.9 VIS: 70
PULL BHA. RIH. DRLG F/ 11712'-12300'
RE EtVED
& Gas Cons. Commissior~
Anchorage
WELL · P1-05
OPERATION:
RIG : POOL 7
PAGE: 3
07/04/93 (20)
TD:12950' ( 650)
07/05/93 (21)
TD:12980' ( 30)
07/06/93 (22)
TD:13720' ( 740)
DRLG.
DRLG TO 12542'
12950'
MW:10.1 VIS: 77
CIRC. SHORT TRIP TO 10800'. DRLG TO
DRLG. MW:10.1 VIS: 61
DRLG TO 12950'. CIRC. POOH. M/U BHA. RIH. DRLG TO
12980'
POOH.
DRLG TO 13720'. CIRC. POOH.
MW:10.2 VIS: 67
07/07/93 (23)
TD:13825' ( 105)
07/08/93 (24)
TD:13825' ( 0)
07/09/93 (25)
TD:13825' ( 0)
07/10/93 (26)
TD:13825
PB: 0
POH TO 12700' MW:10.2 VIS: 64
POH, BHA RUN # 14, RIH TO 13720', CUT DRLG LINE, SERV. TOP
DRIVE, RIH TO 13720', DRLD TO 13825', TD, CIRC @ 13825',
POH TO 12700'
RIH TO 7350' MW:10.2 VIS: 78
POH TO 8397', RIH TO 12990', REAMED LAST 7 STDS TO BTM,
REAMED TO 13825', CBU, POH TO 977', L/D BHA, RIH W/BHA #15
SERV DRILL FLOOR, RIH TO 7350'
TO 2100', SERV DRLG EQUIP,
NOTE: TOTAL COST $2,807M
COND. MUD WHILE LOGGING MW:10.1 VIS: 64
RIH TO 12467', TOOK MWD SURVEY @ 13775'. COND MUD WHILE
LOGGING
RUB CSG. MW:10.2 WBM
SURVEY. CIRC. SHORT TRIP TO 12890'. CIRC. POOH. L/D
BHA. TEST BOPE. RIH W/ 7-5/8" CSG.
07/11/93 (27)
TD:13825
PB:13724
RUN CBL. MW: 8.5 NaC1
RIH W/ 7-5/8" CSG. CIRC. RIH W/ CSG. CIRC. CMT CSG W/
630 BBLS CMT. TEST BOPE. RIH W/ JB/GR. RUN CBL.
07/12/93 (28)
TD:13825
PB:13724
07/13/93 (29)
TD: 0' ( 0)
RIN W/ 4-1/2" TBG. MW: 8.5 NaCl
RUN CBL. TOC @ 13050'. CMT THRU PERF INTERVAL. RIH W/
4-1/2" 13 CR TBG.
NOTE: CUMM COST: $3,963,542
RIG RELEASED 18:00 7/12 MW: 0.0 VIS: 0
INSTALL SEAL ASSEM. N/D BOPE STACK, INSTALL TREE, PERFORM
INTREGRITY TEST ON TBG, TEST ANNULUS TO 3500 PSI, RIG
RELEASED 18:00 7/12/93
SIGNATURE:
(drilling superintendent)
DATE:
Alaska Oil & Gas Cons.
c¡~-'ð1
~
) / 1\
,/" -"
. . -'1 1\ '
--,/vlii
~
>
. .
~ NJ. 1
.............1...1.111......1..............................
....1...1 ..........
j.IIUII.. '-~ ..........
'8181111' ~8JI.t.IBRCI!R ~ 4--..11....
_"lIlIn ~.II"""
8..................1....1..1...'...........................
. '.IHIIIU.. ~ IJORIIt '.IIII.nn
j,~~ ~,'l!!m"".y.nJ~
'~.~WII£ ,:_~
~n(Jt 1 -..rA:1IIn1E
1JrATI(If 2 "8J8A
1WH.iIC IEClI*TUII ~.O7
:iWE: '~
E.L tI.JIØ: ~
~1I1L 1EAD 1.Œ'.ATI()f: tAT(MI-S> 'C.eo ,mPCE/-W) 0.'00
aIItIJ'ni ~ IIJTARY tABLE to Tt1I&ET IS 15.35
'TIE IN POIHTCUP) :
'1Øt5lm JÐ>ni 0.00
11lŒ Vfm mPTH C.OO
DnI*n~ C.OO
AZIM'H 0.00
LATlTUDí(Hf-S) 0.00
J)1PMTtRE (E! -II) 0.00
RECiEIVED
OCT 11 1993
l~c\'1 ~ Iii> ~:~ A f Ita AI ED
~I':..\ ~; [1 ;'<,0':.' ;:¡ \:,,:: ~14 F';~;i:1 ..' AIaskaOiJ& Gas Gons. Commissîon
l't Ü .. ~ ~:~ \~ " is ~ ' Anchorage
Date I /3 J ù I
.,bE NJ. 2 P1-05/Jl
..IIIU.UIII ~ HII.1l1I11I1I(
9..R\IEY fAlDJAnCHi
....'.'.111.. ~ ItRC ~
tf.A9..m DmWAL 'ARTlCAL t~ snn() AZIIIITH UTITœE IfPMn.RE ÐI~ ~t AIDtJTH .us
1!f1H m7H særI~ ~. tV-S E/;I ~
ft ft ft ft *9 ~ ft ft ft de9 100ft
,to 0.00 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
>
242.10 242.1 242.10 0.39 0.20 107.50 ~.13 0.40 0.42 107.50 -0.08
331.40 89.3 331.40 0.61 0.10 103.20 ~.19 0.63 0.66 106.99 0.12
421.40 90.0 421.40 1.01 Ð.50 119.10 -0.40 1.05 1.12 110.94 0.45
505.00 83.6 504.99 2.12 1.20 108.50 -0.86' 2.20 2.36 Jll.29 O.as
599.10 '4.1 599.05 4.b3 2.20 112.90 -1.87 4.79 5.t5 111.32 1.07
:688 .10 89.0 lÞ87 .93 !.n 3.60 107.eo -3.39 9.03 ~.6-4 110.58 1.60
776.00 87.9 775.63 14.30 4.20 105.30 -5.08 14.76 15.61 109.00 0.71
&7.00 fl.0 866 . 33 21.28 5.00 99.~ -6.lIJ 21.89 22.86 J06.79 1.02
"'93O.oo -63.0 '929.10 2b.bO 4.90 '95.40 -1.00 ?J .28 28.24 t04.ge .Ð.56
1.022.00 '92.0 1020.~ 36.63 1.70 ;15 .70 -1.21 :37.34 ..03 tOO. 'J3 ,~.25
1114.00 92.0 1111.55 -SO. 07 9.10 ts.90 -ð.13 50.74 51.12 -'7.00 1.~
.-1!O6.00 f2.0 :1202.44 64.~ ~.10 ~.70 '~.SI 1164.'4 65.16 . ...67 :10 .45
,.:I2M.OO 92.0 ~nn.!5 :f9.oo 9.10 :::Ð.1O ::.4!9 ')In .63 ?J.17 ~.'t;) .1.tO
':1389.60 . 91.6 '1383.27 --,s. 90 11.60 '19 .40 ...... .19 '.b.~ '96.65 ""92.48 2.10
:1431.20 fl.6~IC72t56 116.32 ~4.!O ~.10 -:-2.14,;at6.92 ".1U.'5 91.94 ~.22
.ß14.40 13.2,1162.13 -139.12 D.tO ~".~ ,r..B5 ;~!1 -440.%1 ..65 1.37
-WMJO ""'.3 ,~M .iiM.l1 ~~ .;1'83.10 ,¿t6 ,'J¡1M.!8 . .,;'1111.15 ~_.I) -1d6
'm4.69 .~.O JÐI5.t4 ,!tt1.tl ,,~~ "';~-" /é-'.U "..~ ,~~91.19 ".17 -æ.15
!tW.07 ~. 4 :3J'12.:" '!!1.'M .".16 "'e.. Y.46 '~22I..40 '221.61 'Ð.~ :S...
1929.66 82.6 U99.83 251.12 22.00 11.~ 12.66 150.9'2 251.~ 87.11 3.40
em.36 99.7 Im.04 :291.27 Z~ ~.t6 .:B.33 æ90.75 191.32 ;wI6.39 .2.01
2121.88 92.5 .&74.11 .-J31.75 -16.68 ~.TJ 23.14 ~.92 331.77 .85.'10 1.55
~1!213.52 91.6~.4f2 'S73.!1 '11.15 I~.IO "&22 1172.15 .:J73.!2 :IS.66 :1.12
'~..1 92.9 ~.95 ~ló.76 '..13 .1.10 .13.18 '-415.42 41b.76 - 15.41 2.39
t399.02 '92.6 'I3U.11 '462.00 !9.13 <12.43 ~.62 ...e60.'31 <4&2.01 :85.08 '1.10
æ491.17 92.1 2197.52 "'.67 ~.Q «.14 :t5. 95 'S7.61 '~.69 ~.13 ..09
25ð4.&O 93.6 M75.35 361.6ð 14.94 1tJ.17 32.22 ~559.29 561.72 ".67 2.62
2676.81 92.0 J550. 82 ~14.)J 14.~ e.t! ':57 .!9 '11.67 '614.~ "'.65 Ð.&
2769.40 92.6 2625.26 669.33 38.11 &.70 '1.16 JJó6. 'S7 669.37 ~.16 3.66
2858.15 &.7 2693.09 726.52 42.19 83.39 66.17 723.~ 72b. 56 64.77 5.19
2!M.16 6.0 2697 .~ T¥J. 51 42.3ð !3.64 66.62 TlJ .56 7?IJ./IJ ð4.77 4f .15
2949.11 85.0 2759.37 7&.79 -44.20 13.72 13.04 7!5.46 1M.85 -14.69 2.15
»«.07 ~.O '2827.34 855. Oð 44.39 14.00 80.13 851.39 855.15 84.62 Ð.!8
3137.48 93.-4 2892.09 m.3ð 47.S3 86.12 85.89 118.4-4 922.45 &4.66 4.03
3229.68 92.2 .!95£. 50 m.02 50.~ &$.56 90.33 187 . 95 192.07 6-4.78 2.71
3323,59 93.9 0011. ~4 1065.12 51.93 es.6t 95.32 1060.88 1065.16 M.B7 1.90
3411.55 U.O ~5.19 1134.7~ 52.74 63.63 101.85 1130.20 1134 .7ð ð4 .85 2.01
~.57 93.0 3121 .~2 12Oð.81 52.87 84.65 109.41 1203.91 l2Oð.87 64.81 O.M
.3599 .44 94.9 3178.56 12&4.55 53.07 16.09 115.52 1Z79 .40 12&4.60 M.M 1.23
. ttJ'E t(J. 3 Pl-cr51 J7
HIIIIII.U" .~ ...unll.....
QR.ÆY CI\LOJ.ATlæs
.llIn U II II I CIRCtlJí< N1£ f£T1-œftHHfl
I£ASI.m IHm'VAL tJÐ\TIrAL tAntli STATUti AWIJIH LATlnfi ~ ÐI~ &t mflmi .m.s
11Ð>1H m1H QIT1~ DI:1.Ji. JV-s E/-W ~
it ft ft it *9 4!q .oft ft ft '*9 tOOft
~ 3693.17 93.7 3234.al 1359.46 53.07 &.65 120. 2b 1354.17 1359.50 M.92 0.48
3786.05 92.9 3291.18 1433.32 52.30 83.94 126.31 1427.78 1433.36 t4.94 2.47
17'9.39 93.3 3348.03 1507.31 SL.M 83.22 134.59 1501.~ '1507.36 :.84 .88 0.72
3971.~ 92.0 3403.90 15ðO. 40 52.59 83.10 t43.3j 1573.96 15eO. 47 &4.80 0.13
4Oó5.22 93.8 3460.72 1654.99 52.8-4 64.20 151.55 't64B.12 1b55.oe 64.75 0.97
:4157 .42 92.2 3516.32 1728.S1 52.99 83.60 159 . '1l 1721.26 1728.62 -84.71 C).54
4190.7~ 33.3 3536.37 1755.12 53.06 M.6ð 162.08 1747.74 1J'55. 24 84.70 2.59
4260. B6 70.1 3578.70 1811.01 52.67 83.27 167.95 1803.33 1811.13 ~.68 1.70
43S3 . I:IJ 92.7 -3óJ.4 .72 18&4.89 53.00 85.86 V4.9SW6.e9 ms.02 &4.67 2.25
44W.9~ -94.33691.42 1960.~ 53.13 ,&.06 .110.26 1952.11 .1960.42 .....72 ,-Ð.23
4541.36 93.4 3147.29 ::8)35.16 :53.40 ~.~7 US.!9 ~.&O ::J!035.17 :14.77 ~.!9
-4629 .40 88.0 3199.73 :2105.& 53.48 17.28 .i89 .~ .2fffl.40 E05..94 14M 1.11
.CJ'22.UJ 93.2 wm.33 ~.eIO.62 $i.27 "16.'4 393.'17 . :s72.10 wuo.&e -44 .92 ~.16
'tt9.53 -16.9.813.44 :œ5I.lð ,A06 ;...41 ,¡-Tn.Y1 ,~~!5 .<'f8!L'!3 ,414.98 ..49
:'~3.83 94.3 -7110.171133.48 ~.Vl '8,7.!1 :~m :'''2124.16 ,t'~.52 "85.03 () .69
5i005.95 92.1 ~.87"~ ,'~164 : &1.18 .. _.04 -2'.117.17 t'I406.M .em. 04 -3.42
.~.5099.67 '93.718082.09 }881." '~.S1A5 ,~..,~J6,:8I1E.37 1.R1.83 ."."99 ..t ,12
:J1&15 89.1 :.4134.96 ~~'Ø5a.~ .~ . -CU1 ..tØJ4.-e18GIO.'~~ ,~~.95 ..19
'''',D2.tð fi.4 ,4191.11.;-..0 -~...so ,.;82AO '~'.._M ;:':88t09 ;;£...89 -:lt19
-'.$U6.19 ....O:.1lM7 .!O':21I3.'38 '34.13 ..12 -8N1J5'W92.15 'W03.49 "'.12 I.W
5470.13 93.9 01.83 V79.11 54.54 13.00 33.95.2768.23 Zl79.& 44.76 0.19
.5563,05 92.9 4355.99 ,~.15 -54.15 ..42 .1!Q.17 ~8ß.20 :1155.13 --'.12 ..~
5657.59 94.5 ~11.34~.74 .54.1ð æ.eo ZJ2.G7 :.Ø19.!9 ,831.94 ~.6ð j).53
5150.93 93.3 4165.14 ,811M '14.'37 ..54 181A7~.53 -.cr M 84.64 ..0
5M1.~ W.7 ,~.tó :810.17 '53.90 "..19 1!9.11 ~S67.47 t081.13 ".60 ..15
"5934.00 92.4 4573.13 :J!55.!4 53.42 S?. 97 '299 .04~.1.14 'Sm.'" -84.56 æ.~
,~.10 iN. 7 't629 .9ð.:mt.t4 ":53.10 C. -49 ..M 'SlU.'1 ~.68 c,-..5'2 :C).~
6121.90 93.2 ,4685.22 ß\6.32 :5'3.60 ,~.91 .;J1I.!2 ~e1.16 ;1306.71 c44.'4ð G.'!I
6214.5ð ~.7 4740.65 3380.53 2.94 12.78 ro .47 -S365.06 .øo.~ ".44 0.12
6rJ7.'/9 93.4 V97 .33 3454.66 52.36 t1.27 337 .77 :8438.59 am.14 84.39 1.42
6400 . M 92.e 4853.40 352ð.47 53.29 82.71 34S.07 3511.!1 3m. 02 M.~ 1.59
~94.ð1 t4.0 -4909.01 3604.20 54.19 t2.63 357.74 35ð7 .00 360-4.80 M.~ 0.9b
~.83 94.0 .9~.24 3680.23 .53.85 æ.9ó .166.62..3662.56 -3680 . a7 14.28 1.20
66el,l? 92.3 5018,17 3754.73 ~.76 83.83 374.54 3736.66 3755.39 &4.28 0.15
6775.34 ~4.2 5074.7~ 38)),43 53.31 83.59 182.84 3&U.94 1531.12 14.26 Ð.52
~7C.03 94.7 5130.58 3906.U 54.40 ~.a7 390 .52 3Mð.02 3907.58 M.26 1.59
691:J.97 93.9 51e5.40 3983.17 ~.20 ~.95 m .'l9 39601 .01 39ß3 . ~7 ð4 ,28 0,22
7056.80 92.ð 523'i.Sl 405ð. 60 54.48 8S.æ 403.70 >4039.16 4059.29 64.29 0.43
7145.77 89.0 5291.07 4131.10 54.69 85.46 -409 . 54 4111.43 ~131.7ð 84.31 0.27
7232.36 16.6 ~1.50 '4201.49 54.07 es.!1 414.90 41181.62 4202.15 64.33 0.78
.'fŒ I(). 4 Pl-05/J7
~fl.lllfll'.. ~ .'...'11."..'
9ß'EY tW.DIAn{)tS
-HII.IIIIIII. tIRa1.AR ti£ ~
ff'.A9.m ~ WMlrAL tNQ"T SfATJ() jzDIfH JATßWE.IfPNm.RE ÐI~ at AZDtmi JLS
IB=1ti 'W'ni 5ŒTI£I' .DIlH. W-S EI~ Get¥
ft ft ft ft ~ éeq ft it ft 4Ieq 100ft
,ß 732J .45 -r.i.1 'SYfl.26 4278.~ 5-t.12 ~.7~ 421.j5 425ð, 3B 4279.17 84.35 0.91
. 7419.7ð 92.3 ~1.16 «3S3.V 54.44 !5.32 127.74 4333.06 <C354 .12 14.36 0.62
75fJ7.34 D.b ~1.97 4424.7ð 54.61 85.11 -C33.69~.12 ~.42 84.38 0.27
m1.!S M.5 !550.77 4493.78 54.es es.24 439 .50 WZ.ð7 449~.41 34.39 0.31
7618,38 26.5 5S66. ~ 4515.4ð 54.89 as.lð 4U .31 - ~4.50 4516.11 &4.39 Ð.24
7711.50 93.1 5619.75 4591.54 54.65 85.95 447 .19 60.33 4592 .15 &4.41 0.72
7804.9S 93.4 5673.&6 ~.73 54.59 85.71 -452 .73-4646.32 -466ð. 32 8-4.43 0.22
7898.75 93.8 572S.4ð 4143.99 54.20 85.95 45&.28 ~Z2.3S 4744.57 ð4.46 0.46
m2.67 93.9 5783.04 4a2O.42 54.75 16.~ ..463.62,.4798.63 -4820. 9S 64..48 0.60
tOðO.98 &.3 S834.Oð -4892.50 S4M as. 40 .Ma.99 A&10.51 ~.03 -- ''''.50 ,~.6()
~173.02 '92.0 iJð87,!4 '.4967.62 54.79 '-16.33 .ot74.40~.i4 -4968.14 M.52 Ð.M
!2b6.37 "t3.4 39-40.73 30«.10 ~.)J Iil. 'l9 .474.66 .alJ.83 '5044.59 .6C .56 1.01
&b6.2e '1. ~ ,1970.11 1IDI6.73 ~.23 ,..09 _31 ~.45 '"SM7 .18 '~.5ð 1.26
,~43 S' .1 ,,891.1O..sw.;13 ':54.&1 ...16 ~æ~ 35117.56 ,~.60 ...1.13
-'~'99 ..6 .~.1O-Stf1.'D -'14.10 86.52 ..W'~..98 ~197.66 84.64 1.~
.:8549.36 :'is... ,.6104.M .5274.49 54.97 ~,!5 ".15 3252.Ð9 .-SO 4.86 .at.67 :Ð.!!
. MG.10 ;93.7 tiIWO.12eÐ.lõ "",.sa.66 ~;:~.15 ",c8;51!,8JZ1 A9 't1S35O.50 ".11 "'..51
"-.rJ] .11 '...Ð .-u.~ .~.Jt ,'~.57 ':a5M ?<{a8L12 4W82J-4 ~.65 ....13 ,.1.13
'83JM ',"'.oæI.U _.12 ('S.. .-..15 ',8IAÓ ,:8WlI3 '15499.92 ..75 '.:..16
2\8922.89 '~.'8 ,,-&DO.!9''''11 ~3Z.64 ::86.-15 _.'I4'~.?J '52.50 14.77 :O.ð2
W17.04 '4.2 Q87.56 .5646.94 52.43 .e6. 43 513. U3623.M 1W.21 14.19 Ø.Zl
9110.73 93.7M44.195n1.10 :52.27 -6>.62 .117M"'5IRl.fR -"5'21.'95 14.81 "'0.23
'206.83 '6.1 ,6503.1357V7.46 52.98 -'4.74 S23.C3 :3174.03 'S197.7J -e4.82 t.n
Ð'>1.97 '15.1 .:Ø6C),45 :5873.39 -:52.'92 ~.S3 S30.33...,.65 '~.65 ~.82 0.09
9395.37 \f3A "4617.13 ~.17 'J2. 04 IS.'. '~143"1923.48 r"5947 .72 84.83 1.12
~.29 to.9 4Ð'3.Z4819.08 "l.W e.74 "'1.15 ~4.89 "19,32 I4.M ~.16
'f544.05 37 .! ~t87 ..a.64.62 -32.!1 44.94 '545.45 ;8fO.!9 .....& '14.84 t.'22
''9579.73 35.7 VSJ.79¥112 .73 .51."'-; "'.48 Ma.H ..068.33 ,..ø3.02 ....~ J.18
9682.'" t02.8 6793.84 ,~TJ.93 ~.33 ".27 ~.OO ,'l49.t)9 6174.18 t4.!3 0.37
977S.53 93.0 ~.9ó 6247.35 51.92 64.65 563.09 6222.18 6247.60 84.83 0.55
f868.4O 92.9 ~9Oð. 4ð 6320. is 51.~ 84.51 569 .98 6'l94.76 6320.51 64.83 0.42
99OB.~ -40.2 b933.~ ô3S1.M 52 .16 ð3.4B 573.28 ~.19 6352.11 ð4.a2 2.54
1961.66 53.1 6965.61 ~.93 52.85 &4.15 SJ7 482 .Q6ð.05 6394.21 64.82 1.65
10054.66 ~.O 7021.~6 ,6467.92 52.57 64.79 5ð4.9S 6441.70 646! .20 M.a! 0.63
1014ð.51 93.9 7078.06 ðC3.H 54.01 16.7~ 59'0.49 6516.72 ~t42 ð4.!2 2/0
t0243.Oð 94.6 7134.29 ~19.14 53.01 p;Jf~ 594.40 6592.65 ~19.39 ð4.a5 1.19
1om.S! es.~ 7185.83 ~.24 52.77 e7.26 597.59 6660.71 U¿7.47 ð-4 . ß7 O.~
10429 .26 100.7 7245.67 676ð.21 54.35 U.19 600.80 6741.69 6768,41 ð4.91 1.73
10525.56 96.3 nJ2.56 6M5.77 53.24 t9.26 ~.53 ~1~.37 ~.9~ &4.95 1.46
10617.iIJ 92.0 ræ;¡ .63e19.29 S3.2ó 90.39 1IJ2.1ó 4893.12 6919.42 85.00 0.98
.HGE NJ. 5 ; PI-Ð5/J?
.nun...... ~ tllu....uun
aR'ÆY tAID.1ATI~
..II.IIII.W.. CIRClIJi{ ARC ~
tŒÆUŒD IHm<VAL vmTlCAL T~ STAn~ AZlftJ'rH 1ATItlÐE ~ DI~ it AZlttnr! JH.5
Dn>ni mYTH sæTI~ DIJjf. W-5 E/-W åe9I
ft ft ft ft tIeg 1Ieg it ft it *9 100ft
~ 10710.~ 92.7 7411.5ð 6994.47 55.59 89.56 602.80 69U.~ 6994.56 85 .06 2.62
~
10804.42 94.1 7464.95 7071.73 3S.~ e9.73 .603.29 7046.02 7071.80 85.11 0.35
10098.47 94.1 7S18.78 7148.65 54.&! 89.36 603.90 7123.14 1148.69 85.15 ~.55
10942.71 ~.2 75«.26 71~.72 54.77 89.41 ~2ß 7159.~ l1M.7S 85.1ð 0.26
11084.96 142.2 1626.'ZS 7300.74 54.85 !B.3B .606.53 '7275.52 Tm.7S 85.23 0.59
11182.37 97.4 7682.50 73ð0.16 54.61 88.H 6Oe.94 1355.01 13&0.17 85.27 0.32
11275.98 93.6 1736.97 1456.21 54.22 -&.07 611.4S 7431.10 766:12 85.~ 0.42
11370.43 ~4.4 7792.3ð 7532.61 53.93 &.05 614.~ 7507.54 1532.61 e5.32 0.31
11464.56 94.1 7648.26 76œ.'lJ 53.Z3 &.13 616.57 1583.25 7bœ:ll 85.35 0.75
,.......11111 .......II.IIKIIK
Q'j-b1
rr: ~ ~r\ ~fILMED i :', ."\',1
~ ..:.. ,'. ' . :~~.; ~:....: n li t.' "j ; ~\ i u ; ¡\ l /\ L
,~~~.{;\'V. \i'1
n')+p ¡J3JðJ
Pfí;E t£. 1
**1...11.....11......1..1111..........11111......111.1.....
1I1III1I1 1.1.....11
'i 81111111. ,~lJ. ,...IIIUn
,...111.1. ~ 8111......
..111..1. ..II.I.'.~
~....'.III.I.I..'IIII'.I....'II".II'.I'.I.I.IIIIII........
".IHIUI"I ~~._~ PIIIRM ..lIllInu
';1DWIHY "~JllUHEIAY.1RIU..OC
~?au. ME ?1 ~/J1 \T 81
1.Œm~ 1 4fØIMf 1k:tNT"tRE
1OCATI~2 -AIJtSlA
MH.iIC DECLlHATI~ ~.O7
lATE: 22-U-93
8LL~ ~
rYEU. tØD LOCATUlh LATUV-S) ~.OO JtP<EI-W) 0.00
IilDlmi fIR(J( tmM'í DBLE TO ~ IS 85.35
tIE 1M fOIKT(TIf') :
~ ~ 0.00
TRUE IM:T ÐfPTH 0.00
IHCLlMATI~ 0.00
AZIMH 0 100
LATlTUDE(Hf-S) 0.00
~(EI-W) 0.00
RE~E\\JED
OCT 1 ì 1993
. C mffiiSS\O'0
Alaska Oil & Gas Cons. 0
Anchorage
f>~ MJ. 2 P1-05/Jl 51 11
nUUlllUU ~~ IIUlllnnn.
SRJEY tALa.lATICH3
IIKKkt.lllkl. CIRCULAR ARC ~
!£AStRED IHTfíNAL m'TlCAL Tti<G£T 'STAnœ mtlITH LATITUDE)fr'Nm..RE DIS?lAC9ÐIT it ~IItJTH ÐLS
IfJ1H IfYni 5æTICtI ~. H/-S EI-W '~
" ft it ft ft 1IPg deç ft ft ft deç 100ft
>
0.00 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
242.10 242.1 2e. 10 0.39 Ð.20 1~7.50 -0.13 0.40 0.42 107.50 0.08
331. ~ 89.3 331.40 0.61 0.10 103.20 -0.19 0.63 0.66 106.99 0.12
~21.40 90.0 421.40 1.01 0.50 119.10 -o.~. 1.05 1.12 110.94 0.45
505.00 ð3.6 ~.9'9 2.12 1.20 106.50 -0.86 2.20 2.36 111.29 O.as
599.10 94.1 599.05 ..63 2.20 112.90 -1.87 4.79 5.15 111.32 1.07
1&.10 89.0 W.93 8.12 3.60 107 .~ -3.39 9.03 9.6-4 110.58 1.60
776.00 87.9 775.63 14.30 4.20 tOS.3j -5.00 14.76 15.61 109.00 0.71
667.00 91.0 &6.33 21.2ð 5.00 99.æ -h.6lJ , -21.89 22.M 106.79 1.02
B.OO :63.0 129 .10 -~.60 ~.90 ~.40 --7 ~ . ,"'.'26 ..24 l04.~ .0.56
1022.00 92.0 1020.~ 36.63 7.70 85.70 -].21 37.34 ~.03 100.93 3.25
1114.00 92.0 1111.~ SO .07 '.10 "85. to ",",.!3 '50.14 '1.12 "7.00 1.'52
.1206.00 92.0 no2.44 -4A.~ -1.70 ,a~JO .~t'SO ---eM.'4 åS.t6 -94.67 .~.45
1298.00 ~.O U9'3.25 79'.00 '.10 .:C7 .10 - ,...,.. ~ :,".63 79.17 'f3.)j t.10
1389.60 91.6 1383.27 415.90 11.60 19.40 -4.19 tb.56 96.65 ~.4ß 2.10
&431.20 tl.6 J47Z.56 ~116.32 t4.20 '183.10 -2.14 .116.92 116.415 '1.34 .3.22
:1574.40 '~.2 :1562.13 '139.82 ~15. to ~" .50 " 1).85 ,.40.21 140.21 'fi.65 ,J."37
.uM.70 .0.3 ,:;'I6f9M ,MÞ4.11 ,.;16.10 .;113.).? ~.46 , !1.64.-æ 164.15 ..45 :J..1J6
"1154.69 --90 .01735.54 191.01 "tð.60 ~.26 7.11 !91.06 191.19 W.17 '2.15
1&47 .07 iJ'2.4 1822.77 221.44 19.86 85.M .A6 !21.40 221.61 17.55 1.38
1929.66 .82.6 1399.83 251.12 22.~ t1.95 12.66 .1SO. 92 251.24 Ð.l1 B.40
2029.36 99.7 1991.04 !9l .27 25.~ 81.86 18.33 290.15 291.32 &.39 3.01
21Z1.88 '92.5 2074.!1 331.15 b).6ð 12.77 ~.1~ 'D.92 331.77 ,115.90 '1.-55
2213.52 'tl.6 ~.92 'S73.!1 27.15 ,"-.80 21.22 '3l2. 15 373.!2 '15.66 1.12
2)J¿.41 92.9 -2Z37.~ 416.76 !ß.83 11.10 33.3e 415.42 41b.7ó e5.41 2.39
l39'9.02 92.6 zm.71 <162.00 'Rj.1ð 82.43 ..62 ~.31 1162.01 ,as.tIe 1.10
2491.17 92.1 YJ97 .52 .509.67 32.62 62.~ -45. f5 ~7 .61 309.69 :t4. 83 8.09
25ð-4.80 93.6 P475.35 561.6ð 34.94 83.77 ~.22 '559. 2'9 561.ìi ,f4. 67 2.62
2b7b.81 92.0 2550.12 614.XJ 34.84 as .1ð Sl.29 611.67 614.35 64.65 O.M
2769.40 92.6 2625.26 669.33 38.11 M.70 61.16 UIJ.57 6/;9.37 &4.76 3.66
2!58. 15 68.7 2693.09 nó.52 42.19 43.39 U.17 723.~ 726.56 ~.77 5.19
2U4.16 6.0 2697 .~ T¥J .57 42.38 -83.M 66.62 727 .56 T¥J . fIJ ð4.77 4.15
2949.11 85.0 1J59.~ 788.19 44.!O 83.71 13.~ 785.46 7M.8S ~.69 2.15
~.O7 95.0 2827 .34 855 . OB 44.39 84.00 6:).13 851.39 8S5 .15 ð4.62 0.28
3137 .46 93.~ 2892.09 922.38 47.83 &.12 15.89 f1ð.44 m.45 ð4.6b 4.03
:m9.M ~.2 2'152.50 99'2.02 so.)) M.~~ 90.33 9!7 .9S 992.07 84.78 2.71
3323.59 93.S ):)11.44 1065.12 51. 93 85.é2 95.32 l060.M 1o¿5.16 ð4.B7 1.90
3411.55 M.O 3:165.19 1134.7~ 52.7-4 83.63 101.85 1130.20 1134 .7ð &4.BS 2.01
3504 .57 93.0 3121.42 12OB.81 52.87 t4 . ~5 109.~1 1203.91 l2Oð.a7 ~.ðl 0.88
3599.~ 94.9 317ð.56 1284.55 53.07 &.09 115.52 1279.40 1234.60 84.6-4 1.23
f'AGE þ(J. 3 f1-05/I.T7 Sf .1
1111111111111 ~ILL 111..11111111.
StJmY CALWA7IOO
..UUllnIU ClRO..IJIR N<C ~
ftFASæED Dmi:VAL VBmCAL tMGli STATl~ AZIPUrH lATrttm ~ ÐISP~ it AZI"'-!n1 BLS
wrTH W1H m'THIt ~. -M/-5 EI-W œw
" ft ft ft ft deg dPq ft ft ft ~ 100ft
>
3693 .17 93.7 3234.87 1359.46 53.07 &6.65 120.26 1354.17 1359.50 84.92 0.48
3786.05 92.9 3291.18 1433.32 52.30 83.~4 126.31 1427.7ð 1433.36 &4.9~ 2.47
3m.39 93.3 ~.03 1507.31 52.66 83.22 134.59 1501.34 1507.36 84.M 0.72
3971.42 92.0 3403.90 15ðO." 52.59 A3.10 143.30' 1573.96 1580.47 M.80 0.13
+:-65.22 93.8 ~.n 1654.99 52.~ &4.20 151.55 1648.12 1655.08 84.75 0.97
~157 .42 92.2 3516.32 1728.51 52.99 A3.60 159.37 1721.26 1728.62 M.71 0.54
4190.74 33.3 3536.37 1755.12 53.06 ð4.~ 162.M 1747.74 17SS.2~ 34.70 2.59
.c260.M 70.1 3S7ð.70 U11.01 52.67 !3.27 167.95 1803.33 1811.13 M.6ß 1.70
.cJ53.6f.J f2.7 ió34.72 taM. 89 53.00 85.M 174. 9S W6.89 1MS.02 -14 .67 2.25
;*4] .94 ~4.3' ~4J1.C2-:t960.~ . 53.13 &.06 ~.!6 - '1m.l1 t9ó0.42 44.72 (». Z3
~1.36 93.4 3747.?f 2035.16 53.40 &.07 185.39 2026.80 2035.27 84.77 0.29
:tI629 . 40 1&.0 'Z!99.73 -:.1105.&6 -53.48 17.28 tU9.~ 'Wfl.40 2105.94 £4.&4 1.11
'4722.60 93.23!55.33 '),I!180.62 . 53.27 "tb.94 m.v 2172.10 :2180.68 ,".92 0.36
'.19.53 96.Ç '':s913.44 ,~.lð . 33.06 0:86.'41 197.17 ~!M9.55 ':mð.'23 ~M.~ .o.~
4913.a3 94.3 '9970.17 2333.48 52.97 87 .21 201.97 2324.76 2333.52 85.03 ~.69
500S.4J5 fl.1 '4025.87 "~2406.84 52.64 :83.28 108.~ r:1I7.J7 2406..M '«).04 3.42
~.67 -4f3.7 ~.09::øl.19 53.65 c1l3.67 :t16.56:'2472.37 -'.Ml;83 \:,14 .'99 1.12
'~51M.7S 19.1 ,-CM,t6 :;'B1.44 :53.54 >,13.37 ~:P24.65 :~.jO ~æi53.50 "'.95 G.19
"'5282.1ð '93.4 4191.17:81&.10 -~.50 '1S2.40 233.8ðS17M .521.09 ~:~.'89 1.39
Si76.19 ~...O4247.!O ''WÐ3.~ .54.33 ~.12 !44.05 -869'2.45 V03.~ "'64.12 1.97
1470.13 93.9 ,01.83 zm.7l 54.54 :a3. 00 253.4]5 276ð.23 7779.&6 ,e4.76 0.79
55tJ.05 92.9 -4355. ~ 2855.15 54.15 13.42 262. ð7 1643.20 2855.33 ~.72 0.56
56S7.59 '''.5 :.4411.34 c!931.14 S4.1ð '12.80 1l2.fJ7 <1t19.19 :m1 t9~ :"'.6e .o.~
5750.~ '93.3 ..~.~ .WJ07 .46 54.37 ~.5A !a1.O? -pm.53 1K)07.69 '84.64 OJ;!
~1.5ð 90.7 -451&.96 3)80.87 53. iJO t2.79 289.81 '¥)6] . 47 X1el.13 't4.6lJ 0.85
5934.00 92.4 4573.73 ~55.24 ~.C2 -12.W !99.04 .J141.34 3155.504 64.56 Ð.55
11fm.70 ~4.7 4ó29.,ð 3ZU.34 53.70 12.49 ~.6ð 3216.91 3l31.68 ð4.52 O.~
6121 .90 93.2 4b85. 22 ~.32 53.60 12.91 318.22 "3291.36 0)6.11 ~.48 0.37
A21~.5ð 92.7 4740.65 33&0.53 '52.94 82.7! W.47 3365.06 33eO. 95 ~.~ 0.72
63fJ 7 . f'{1 93.4 4797.33 364.66 52.36 81.V 337 .77 3438.59 3455.H 64.39 1.42
6400.80 92.8 4853.40 3528 . 47 53.29 82.71 34ð.07 3511.81 3529 .02 &4.34 1.59
~94.e1 94.0 4909.01 3604.20 ~.19 82.63 ~.74 .35a7. 00 3604.80 ð4.)J 0.96
~.&3 94.0 4964.'24 J680. 23 '53.85 83.96 3ôb.62 3662.56 36ðO .87 ~.28 1.20
6bð1.17 92.3 5018.77 ~.73 53.76 13.e3 374.5-4 ~.6ò 3755.39 M.!8 0.15
D75.3-4 94.2 5074.74 3830.43 53.31 53.59 382.&4 3ðll.94 ~1.12 &4.26 0.52
6870.03 9~.7 Sl~.5B 3906. M 54.40 ð4.ei 390.52 3M8.02 3907.58 M.26 1.59
6'163.97 93.9 51a5.40 3983.17 ~.20 ~.95 'Ji7 .?i 3964 .01 3983.al M.2B 0.22
70Sò.M 92.8 5239.51 -i058.60 ~.4ð ð5.:1J ~3t70 4039.16 ~'1.lS' M.lS' 0.43
1145.77 89.0 5291.07 "131.10 ~.69 !5.46 ~.~ -4111.43 ~131 .7ð &4.31 O,V
7232.36 &.6 5341.50 4201.49 S4.Ð7 as.el 414.90 ~lM.62 4202.15 64.33 0.7ð
'i
PAGE KI. ~ f1-fJ5IJ"! 51 11
IIIIIIU..... ~IU. ..uunnll..
~ CALalATICRJ
IIUIIIIIII:.. ClRCt.J1Æ Af« ~
~ ~ VOOlCAL tARGET STATICI~ AZDtJTH LATrruDE ~ DI~ ¡t ÞJ.IM'H ÐLS
S1H m1'H mTI~ IKlH. tV-s EI-W degI
,ß ft ft ft it deq d€og ft ft ft ~ 100ft
>
7'm.~5 95.1 5397.26 4278.52 5-4.12 ~.7~ 421.25 425ð. 38 4279.17 ð-4.35 0.91
7~19.7ð 92.3 5451.16 .c353.47 ~.4-4 85.32 427.7~ -4333.06 4354.12 84.36 0.62
7507.~ 87.t:. ~1.97 4424.7ð 54.61 ð5 .11 433,69 ~.12 4425.42 ð-4.38 0.27
7591.as M,5 5550 .77 4493.7ð 54.es 85.24 439.50 'W2.a7 -4494.41 &4.39 0.31
761ß.38 26.5 5566.04 ~15.4ð 504.89 ð5.1ð 441.31 .w4.50 4516.11 6-4.39 0.2"
7711.50 93.1 5619.75 4591.5-4 ~,65 85,9S ~7,19 4570.33 4592.15 &4.41 0.72
7ð04.9S 93.4 5673.86 46Iil.73 ~.59 85.71 452.73 -4b4ó. 32 ~,32 &4.43 0.22
7898.75 93.8 5728 . 4ð 4743.99 54.20 85.95 45ð. 28 47Z2.3ð 4744.'57 ~.4ô 0.46
7992.67 93.9 5783.04 ,~.4Z 54.75 &.~ ~.62 "-4798.63 4820.98 ~.48 0.60
'8OeO.98 :&.3 ~.Oð ,.~.~ ':54.64 85.40 W.W :"'D.~1 '4Ia93. 03 ~-84.5O 0.60
ð173.02 92.0 Sð87.24 4967.62 ~.79 &.33 -474.40 ~4S.~ 19M. 14 !4.52 O~M
-1266.37 ~.4 ~40.13'5044.10 :55~ Ð."l1 473.66 5021 .83 .:5044.~ 84.56 1.01
831ð.lð 51.~ 5970.31 5066.73 ~.23 ..09 .'480/11 ~~t45 '.~.1ð ~.5ð 1.26
8355.43 37 .1 ~1.60 ,5117.'13 '54.81 :&.16 '.1.~ ; "4.& ~117.56 "'.60 1.13
8453.99 98.6 ~.90 5197.27 ~.10 &.52 ~.09 SV4.98 5197.6f:. ð4.M 1.53
1S49.36 95.4 :4104.14 .5274.49 54.07 t6.~ ,-489.55 "-S252.09 "12l4,ab .:J4.67 0.28
:t643. to 'f3.7~160.12 SJ5O.t6 :53.66 :87.15 493.51' 'VO HI c~.50 ,-14.71 ,0.51
1737.11 "9. . 0 Q16.~ S0.34 "~.57 «i.eo c:f9a.-12 .>5102.14 .~sm.65 '..e4. 73 '1.63
M31.œ 9..0 W4.10 ~.62 Sl.~ 16.~ 103.40 W6.13 ~5499. 92 14.15 D.76
8922.89 '1.8 .cm.?? '5572.21 -52.64 &.15 '5Oð.'" I549.V 5572.50 f4.77 0.82
9017.04 ~4.2 GJA7 .56 5646. ~4 52.43 -i6.43 513.17 5623.~ 5647 .21 :&4.79 0.32
9110.73 ~.7 ~.79 '5121.10 52.Z7 &.62 SV.6ð 5697.89 5n1.~ 84.&1 0.23
9206.33 96.1 6503.13 5197 .46 52.~ .&4.74 523.43 $'74.03 "Srn~71 -&4.!2 1.72
Ð)1.W 95.1 6560.45 J873.!9 ~.92 ".!3 'SJO. 33 "1&49.65 -w3.65 84.82 e.09
9395.37 iJ3.4 &17 .33 5W.47 52.04 1S.7~ S36.43 5923.4ð 5947 .72 a.4.S3 1.22
fj4U.29 W.9 ~.35 e19.oe 51.90 185.1. 541.75 ~4.89 ~19.3'2 ~.&4 0.16
~.OS 57.! OOð. 87 ~.62 52.21 ".9~ 545.45 ,4ð40.~ ~.86 ".84 1.22
9579 . 73 ~.7 ~.79 6092.18 51.99 M.~ 54ð.04 ~.33 6093,02 ".&4 1.18
~M2. 50 102.e C93.~ ¿V3.93 52.33 ~.27 556.00 6149.09 -'174.18 64.83 0.37
~T75. 53 93.0 6a5O.96 6247 .3S 51.92 ð4.65 563.09 6222.18 ó247.bO ð4.e3 0.55
986B.40 92.9 6906.48 6320 .25 51.~ ð4.~1 569.98 6?i4.76 6320.51 ~.83 0.42
WOð.5ð -tj.2 6933.)) ~1.84 52.16 83.~ 573.28 6326.19 6352.11 84.82 2.54
t961./,6 53.1 6965.61 6393,93 52.85 84.15 m.81 ~.05 6394.21 M.82 1.65
l~.M 93.0 7021.96 <646J .92 52 /)7 8-4 .79 5M, CJS ~1.70 64ó8 .20 14,81 0.63
10148.51 93.9 7076.06 ~.14 54.01 &.7~ 590.49 ~ló.n 6S43.42 64.82 2:0
10243.œ 94.6 7134.2"7' 6619.1~ 53.01 a7.~ 59~.~ 6592.65 6619,39 ~.e5 1.19
10328.52 85.4 7185.S3 66A7.24 52.77 87.26 597.59 W:IJ.71 bUl.47 M.a7 o.~
10-42"i .26 100.7 72~5.67 676ß.21 ~.35 U.19 ¿oo. eo 6741.69 6768.41 ~.91 1.73
10525.56 96.3 7302 .56 6M5.77 53.2~ 89.26 1JIJ2 .53 6819.37 M45.94 84,95 1.46
lOó17.Y:J 92.0 TJ57.63 6919.29 53.26 90.39 6lJ2.76 6893.12 6919.42 es.oo 0.98
Ha t-U. 5 Pl-05/J7 51 81
..11111111... ~ILL 11111111...1.1
~ fALDJl.ATICH;
..1111.11111. CIRCULAR ARC ~
ftEASlfŒr ~ ~ICAL TMGf.i ~ATI(J; AZIrurH lJITITœE ~ ~I~ iit ~IPUn1 tLS
œ>TH W1rI æ:rI(I~ ~. W-S E/-W èe9I
.t' ft ft ft ft deg 11eq it ft ft ~ 100ft
10710.3-4 92.7 7411.5ð 6994.47 55.59 89.56 602.80 69b8.~ 6994.56 85.0.5 2.62
1~.42 94.1 74M.95 1071.73 55.XI ð9.73 603.29 1046.02 7071.80 85.11 0.35
1OB?B.47 9-i.l 7S1ð.7ð 1148.65 ~.M 89.36 603.90 7123.14 7148.69 85.15 0.55
10942.71 ~.2 75-«.26 71M.lL 5-4.77 89.41 ~.28' 7159.).1 71M.75 85.1~ 0.26
11M4.96 142.2 7626.25 T¥J(j.74 54.as U.3S 6Ob. 53 727S .52 J'YjfJ .7S 85.23 0.59
11182.37 97.4 7682.50 73ð0.17 5-4.61 U.14 608.94 7355.01 738C.1e as.V 0.32
11242.55 60.2 7718.05 1428.71 52.99 !5.07 611.80 7 ~3. 4ð 7428.72 85.28 4.91
11337.25 94.7 m4.H 7505.01 5-i.36 ð5.9 618.02 1119.52 7505.01 es.2ß 1.51
11433.28 96.0 7ð29.96 7583.14 ~.56 83.97 Ø.14 75'57.33 1583.15 !5. 27 1.37
115U.87 93.6 1M3.8611fJ9.i/J . - 35.12 .J4.15 ~~.06 JŒ.C3 '1/fft.64 '115.26 0.62
11560.00 33.1 1902.M 7(&.90 55.65 85.!5 ~.43 lbUJ.59 76M> /10 !5. 26 4.51
J1656.13 96.1 7956.06 77ó6.83 J6.90 16.Ç2 ~.47 :1740.38 17t.bM rs.'lJ 1.~
11116.4ð ~.3 :J9M.76 7417.52 'Sl.-47 17 .13 .443.10 m1.03 .J.a17 .53 ~.2e J.oo
11807/57 91.1 -8~.36 N93.~ ~.~ 17 .10 -646. ~flb7 .34 cJ893.~ '..85.~ 1.01
11901.33 fJ.8 8OB9.94 1972.16 56.70 &.83 651.f19 1945.52 7972..16 85.32 0.29
11996.44 ~.1 ðl42.48 1051.40 '16.15 ~.x17 .61 "~.95;8124.Tl. ~8J51.40 '«).33 O.!3
U095.68 "99.2 8197.r7 .m33.61 SS.76 f,].15 ~.J! ,8106.Vl ~~33.61 c.il5.36 1).~
mI6.34 'to.7 4249'.'~.tð "115.6 ..;8.66 . MIO.&! ,,8W~ -'~lð 85.38 1..07
1221ð.!J 92.5 ~.&1 ,:8283;52 "'.32 10.'1 '461.17 ~#I ,82.83.52 v!5. 4l 1+86
12374.75 '95.9«159.34 ,-a360.62 ~.C2 1O.M 4.60.2h 'G34.53 ..8360.64 'ft). 47 0.98
12464.50 ð9.7 .1413.16 ~.17 52.90 89.76 ,659.88 ,~.35 M32.21 25.51 J.13
12559.M 95.4 80470.30 !5Oð. 40 ~.49 1i/.96 &1.40 ~.10 'I5œ.44 !5.5-4 1.63
12652.01 ~.1 852..718582.71 -"54.13 84.47 ~.'31 ~.a7 'W582.17 25.55 3.1~
W46.29 '4.3 ''8580.49 1658.73 -'SJ.33 84.e7 m."!l - '8632. ~ S65t.7t 85.s.. 0.92
12M2.36 96..1 1639 .02 1734.90 :51~1 85.U 6!9 .92 8708.45 8734. CJS 85.54 1.82
12933.65 '1.3 .8696.231806.04 'iIJ.77 ~.W .é85 .41 &719..37 ~06 !5.~ 1.06
Dm.31 VS.7 1756.35 ,&80.44 51.36 &.7ð ~.16 .m.63 tð8O.49 85.5-4 0.94
J3128.10 98.ð &17.15 t958.28 52.66 86.21 694.92 e931.34 ti5ð.~ 85.55 1.40
13216.01 67.9 M69.M 9028.64 53.71 eb.7ð llfl.22 9001.59 'W28. 70 85.56 1.~
13314.35 98.3 em. 1e 9108.51 ~.9S &.51 703.90 90M.~ 9100.58 85.57 1.2ð
13407.17 92.8 8979.~7 9184.90 5S.M &.03 7œ.M 9157.5ð 91ð4 .97 e5.57 1.07
13503.45 96.3 9033.46 m4.89 56.51 &.43 714.14 9237 . 40 92b4. 97 85.5e 0.76
13593.65 90.2 ~.39 '9340.00 56.U 85.59 719.36 ~12.33 '934{).oe 85.58 0.83
13666.91 73.3 9123.63 9401.22 57.11 &.08 m.S! W3.39 '401.29 85.se 1.29
13742.97 76.1 9165 .12 9464.95 56.7ð 87.U 72J . 59 9437 .03 9465 .~ es. 59 1.23
13779.58 36.6 S'lB5.32 9m.~ 56,25 ð7.YJ 729.00 9467.53 9495 .56 e5 I 60 1.t3
13&28.00 ~.4 9212.23 9S35.6ð 56.20 aJ.60 7~.69 ~7.74 9535.78 ß5.61 0.10
............ I."'...",.,'"
Of~lSllV4L
SUB - SURFACE ~:.~
DIRECTIONAL
SURVEY
RECEIVED
OCT 1 4 1993
Alaska 0il & Gas Cons. Commis',
Anchorage
COmpany ARCO ALASKA, [tiC.
Well Name P1-O5/O7 ST ~1 (1458'FSL & 697'FEL, SEC 16, T12N, R14E)
Field/Lo<ation POINT NCINTYRE, NORTH SLOPE, ALASKA
Job Reference No.
93369
Loqc~ed By:
FORMICA
Date,
AUGUST 12, 1993
Computed By:
SZNES
on
~ SCHLUNIBERGER ·
GCT DIRECTIONAL SURVEY
CUSTOMER LISTING
FOR
ARCO ALASKA, INC.
P1-O5 / J7 ST #1
POINT MCINTYRE
NORTH SLOPE, ALASKA
SURVEY DATE- 12-AUG-1993
ENGINEER' JEFF FORMICA
METHODS OF COMPUTATION
TOOL LOCATION- MINIML~ CURVATURE
INTERPOLATION- LINEAR
VERTICAL SECTION- HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF NORTH 8S DEG 1S MIN EAST
ARCO ALASKA, INC.
P1-05 / J7 ST
POINT MCINTYRE
NORTH SLOPE, ALASKA
COMPUTATION DATE: 31-AUG-93 PAGE 1
DATE OF SURVEY: 12-AUG-1993
KELLY BUSHING ELEVATION: 50.00 FT
ENGINEER: JEFF FORMICA
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET, FEET DEG
0.00
100.00 100
2OO O0 2OO
300 O0 300
400 O0 399
500 O0 499
600 O0 599
700 O0 699
800.O0 799
900.O0 899
0 O0 -50 O0 0 0 N 0 0 E
O0 50
O0 150
O0 250
99 349
98 449
94 549
83 649
61 749
30 849
O0 0 15 S 57 58 E
O0 0 21 S 74 26 E
O0 0 29 S 67 58 E
99 0 39 S 65 12 E
98 I 7 S 67 23 E
94 1 54 S 71 53 E
83 3 30 S 75 47 E
61 4 7 S 78 31E
30 4 48 S 83 6 E
0 O0
0 19
0 62
I 23
2 09
3 33
5.78
'10.07
16.47
24.02
0 O0
0 O0
0 21
0 28
0 05
,1 05
0
1
0
0
69
11
41
85
0.00 N
0.11S
0.31S
0.57 S
0.96 S
1.57 S
2.46 S
3.74 S 10
5.23 S 16
6.49 S 24
000 E
0
0
1
2
3
6
0 O0 N 0 0 E
20 E 0 23 S 61 5 E
65 E 0 72 S 64 17 E
28 E I 41 S 65 54 E
18 E 2 38 S 66 18 E
47 E 3 81 S 65 45 E
01 E 6.49 S 67 43 E
42 E 11.07 S 70 14 E
96 E 17.75 S 72 52 E
65 E 25.49 S 75 15 E
1000 O0 998 82 948 82 6 45 N 87 50 E
1100 O0 1097 84 1047
1200 O0 1196 67 1146
1300 O0 1295 40 1245
1400 O0 1393 73 1343
1500 O0 1491 16 1441
1600 O0 1587 80 1537
1700 O0 1683 95 1633
1800 O0 1779 08 1729
1900.00 1873 19 1823
33.68
84 8 42 N 85 26 E 47.60
67 8 54 N 85 58 E 62.91
40 9 33 N 87 37 E 78.76
73 11 39 N 88 26 E 96.91
16 14 19 N 82 0 E 119.37
80 15 13 N 80 46 E 145.00
95 16 58 N 84 24 E 172.43
08 18 46 N 85 36 E 203.23
19 20 50 N 84 34 E 237.02
3 43
0 21
0 39
I 45
2 43
4 76
0 84
2 58
I 60
2 75
6.83 S 34 36 E 35 03 S 78 46 E
5.84 S 48
4.68 S 63
3.75 S 79
3.20 S 97
1.52 S 119
2.60 N 145
6.16 N 172
8.72 N 203
11.50 N 236
25 E 48
52 E 63
35 E 79
51E 97
90 E 119
28 E 145
52 E 172
21E 203
88 E 237
60 S 83 6 E
69 S 85 47 E
44 S 87 18 E
56 S 88 7 E
91 S 89 16 E
31 N 88 59 E
63 N 87 57 E
39 N 87 33 E
16 N 87 13 E
2000.00 1965.61 1915 61 24 2 N 82 35 E 275.14
2100.00 2056.01 2006
2200.00 2145.31 2095
2300 O0 2233 86 2183
2400 O0 2321 10 2271
2500 O0 2406 79 2356
2600 O0 2489 45 2439
2700 O0 2571 26 2521
2800
2900
01 26 15 N 83 12 E 317 83
31 27 11 N 84 12 E 362
86 28 25 N 83 19 E 409
10 29 50 N 82 37 E 458
79 32 52 N 83 22 E 509
45 34 56 N 84 28 E 565
26 35 25 N 85 29 E 623
O0 2650 71 2600.71 39 59 N 86 6 E 683
O0 2725 39 2675.39 42 53 N 84 28 E 750
83
2'7
O9
57
82
33
99
48
3 O0
1 22
0 72
2 50
0 99
4 92
0 78
I 52
5 08
1 74
15 93 N 274.77 E 275 23 N 86 41E
21
26
31
37
43
49
58
64
30 N 317.16 E 317
19 N 361,91E 362
07 N 408.10 E 409
22 N 456.58 E 458
56 N 507.71E 509
48 N 563.66 E 565
50 N 620.95 E 623
81 N 681.46 E 683
35 N 747.72 E 750
87 N 86 9 E
85 N 85 52 E
28 N 85 39 E
09 N 85 20 E
58 N 85 6 E
83 N 84 59 E
33 N 84 59 E
99 N 85 4 E
48 N 85 5 E
3000 O0 2797 78 2747.78 44 12 N 84 37 E 819.46
3100
3200
3300
34OO
3500
3600
3700
3800
3900
O0 2868
O0 2936
O0 2999
O0 3061
O0 3121
O0 3182
O0 3242
O0 3303
O0 3363
79 2818 79 45 41 N 85 23 E 889.86
25 2886
93 2949
31 3011
94 3071
21 3132
43 3192
08 3253
99 3313
25 49 10 N 87 10 E 963.64
93 51 28 N 86 56 E 1040.68
31 52 33 N 85 7 E 1119.61
94 52 49 N 85 8 E 1199.13
21 52 57 N 86 9 E 1278.93
43 52 57 N 86 21 E 1.358.75
08 52 24 N 83 49 E 1438.25
99 52 27 N 83 1E 1517.51
O. 90
3.84
2.52
2.16
1 85
1 O9
0 64
0 39
2 45
0 O3
71 01 N 816.38 E 819.46 N 85 2 E
77 26 N 886 50 E 889 86 N 85 I E
81 85 N 960
85 60 N 1037
91 07 N 1115
98 18 N 1195
104.20 N 1274
109.32 N 1354
115.70 N 1433
125.08 N 1512
16 E 963 64 N 85 8 E
15 E 1040 68 N 85 17 E
91 E 1119 62 N 85 20 E
11 E 1199 14 N 85 18 E
68 E 1278 93 N 85 20 E
35 E 1358 75 N 85 23 E
59 E 1438.25 N 85 23 E
34 E 1517.51 N 85 16 E
COMPUTATION DATE' 31-AUG-93 PAGE 2
ARCO ALASKA, INC.
P1-05 / J7 ST #1
POINT MCINTYRE
NORTH SLOPE, ALASKA
DATE OF SURVEY' 12-AUG-1993
KELLY BUSHING ELEVATION' 50.00 FT
~!~t~= ENGINEER- JEFF FORMICA
INTERPO~~ VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUB-SEA COLRSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG
4000 O0 3424 77 3374 77 52 42
4100
4200
4300
4400
4500
4600
4700
4800
4900
O0 3485
O0 3545
O0 3605
O0 3666
O0 3726
O0 3786
O0 3845
O0 3905
O0 3965
28 3435
60 3495
94 3555
28 3616
40 3676
13 3736
81 3795
65 3855
67 3915
28 52 48
60 53 3
94 52 52
28 52 58
40 53 6
13 53 22
81 53 26
65 53 6
67 53 5
N 83 26 E 1596.86
N 83 58 E 1676.45
N 84 2 E 1756.19
N 84 15 E 1835.92
N 84 46 E 1915'.66
N 85 5 E 1995.57
N 85 29 E 2075.77
N 85 38 E 21'56.00
N 85 30 E 2236.12
N 85 26 E 2316.10
0 61
0 17
0 25
0 45
0 40
0 47
0 57
0 29
0 16
0 60
134 52 N 1591 19 E 1596 86 N 85 10 E
143 20 N 1670
151 52 N 1749
159 70 N 1828
167 30 N 1908
174 38 N 1987
180.99 N 2067
187.14 N 2147
193.36 N 2227
199.67 N 2307
33 E 1676
66 E 1756
98 E 1835
36 E 1915
96 E 1995
88 E 2075
88 E 2156
76 E 2236
50 E 2316
45 N 85 6 E
20 N 85 3 E
94 N 85 I E
68 N 84 59 E
59 N 84 59 E
79 N 85 0 E
02 N 85 i E
14 N 85 2 E
12 N 85 3 E
5000 O0 4025 90 3975 90 52 45
5100
5200
5300
5400
5500
5600
5700
5800
590O
O0 4086
O0 4145
O0 4205
O0 4265
O0 4323
O0 4382
O0 4440
O0 4498
O0 4557
20 4036
73 4095
89 4155
45 4215
68 4273
02 4332
42 4390
88 4448
89 4507
20 53 21
73 53 25
89 52 48
45 54 11
68 54 26
02 54 15
42 54 21
88 53 53
89 53 58
6000 O0 4617 09 4567 09 53 34
6~0O
6200
6300
6400
6500
6600
6700
6800
O0 4676
O0 4736
O0 4796
O0 4857
O0 4916
O0 4975
O0 5034
O0 5093
6900 O0 5152
37 4626
35 4686
81 4746
46 4807
58 4866
2O 4925
21 4984
58 5043
18 5102
37 53 31
35 52 55
81 52 30
46 53 9
58 54 7
20 53 59
21 53 39
58 53 44
18 54 19
7000.00 5210 61 5160 61 54 15
7100.005268
7200.00 5326
730O.O0 5385
7400.00 5443
7500.00 '5501
76O0.00 5559
7700.00 5617
7800.00 5675
75 5218
77 5276
30 5335
83 5393
86 5451
85 5509
53 5567
32 5625
7900.00 5733 47 5683
75 54 41
77 54 19
30 54 7
83 54 2O
86 54 35
86 54 45
53 54 45
32 54 39
47 54 19
N 83 27 E 2395 93
N 82 4 E 2475
N 81 52 E 2555
N 81 13 E 2635
N 81 16 E 2715
N 82 4 E 2796
N 82 2 E 2877
N 82 5 E 2958
N 81 51E 3039
N 81 45 E 3120
6O
83
53
66
79
89
93
93
52
N 81 32 E 3200 95
N 81 24 E 3281
N 81 7 E 3361
N 80 5O E 3440
N 81 5 E 3519
N 81 48 E 3600
N 82 11E 3681
N 82 19 E 3761
N 82 56 E 3842
N 83 55 E 3923
31
13
57
84
31
20
82
20
20
N 84 I E 4004 33
N 84 6 E 4085
N 84 4 E 4167
N 84 18 E 4248
N 84 26 E 4329
N 84 32 E 4410
N 84 10 E 4492
N 84 11E 4573
N 84 14 E 4655
N 84 21E 4736
67
lO
17
24
68
13
81
40
74
3 98
0 93
0 45
0 62
0 97
0 38
0 22
0 26
1 O2
0 26
0 60
0 58
0 25
0 75
1 83
0 60
0 52
0 72
1 82
0 28
0 21
0 20
0 6O
0 26
0 52
0 27
0 79
0 22
0 13
0 74
206.88 N 2386 99 E 2395 94 N 85 3 E
217.36 N 2466
228.59 N 2545
240.36 N 2624
252.64 N 2704
264.44 N 2784
275.62 N 2864
286.88 N 2945
298.17 N 3025
309.72 N 3105
07 E 2475
64 E 2555
64 E 2635
02 E 2715
46 E 2796
90 E 2878
29 E 2959
63 E 3040
54 E 3120
63 N 84 58 E
88 N 84 52 E
62 N 84 46 E
80 N 84 40 E
98 N 84 34 E
13 N 84 30 E
23 N 84 26 E
29 N 84 22 E
94 N 84 18 E
321 41 N 3185 28 E 3201 45 N 84 14 E
333
345
357
370
382
393
404
415
424
37 N 3264
53 N 3344
98 N 3422
62 N 3501
59 N 3580
82 N 3661
72 N 3741
21N 3820
20 N 3901
92 E 3281
O1E 3361
68 E 3441
17 E 352O
93 E 3601
17 E 3682
16 E 3762
94 E 3843
47 E 3924
89 N 84 10 E
81 N 84 6 E
35 N 84 2 E
73 N 83 57 E
31 N 83 54 E
29 N 83 52 E
99 N 83 50 E
43 N 83 48 E
46 N 83 48 E
432 75 N 3982 17 E 4005 62 N 83 48 E
441 13 N 4063
449 53 N 4144
457 77 N 4224
465 74 N 4305
473 53 N 4386
481 58 N 4467
489 89 N 4548
498.08 N 4630
506.26 N 4711
10 E 4086
11E 4168
77 E 4249
46 E 4330
53 E 4412
59 E 4493
86 E 4575
06 E 4656
O0 E 4738
97 N 83 48 E
42 N 83 49 E
50 N 83 49 E
58 N 83 50 E
02 N 83 50 E
47 N 83 51E
17 N 83 51E
78 N 83 52 E
13 N 83 52 E
ARCO ALASXA, INC.
P1-O5 / J7 ST #1
POINT MCINTYRE
NORTH SLOPE, ALASKA
COMPUTATION DATE: 31-AUG-93
PAGE 3
DATE OF SURVEY: 12-AUG-1993
KELLY BUSHING ELEVATION: 50.00 FT
ENGINEER: JEFF FORMICA
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGl~R COORDINATES HDRIZ. DEPARTURE
MEASURED VERTICAL VERTICAL DEVIATION ~IMLFFH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET ,FEET FEET DEG MIN
8000.00 5791 54 5741 ,54 54 42 N 84 35 E 4818.15
8100.00 5849
8200.00 5906
8300.00 5964
8400.00 6021
8500.00 6079
8600.00 6138
8700.00 6198
8800.00 6258
8900.00 6320
24 5799
95 5856
30 5914
61 5971
90 6029
70 6088
15 6148
89 6208
39 6270.39 52 4 N 85 14 E 5546
24 54 47 N 84 56 E 4899.82
95 54 44 N 85 29 E 4981.49
30 55 13 N 86 21 E 5063.40
61 54 40 N 86 20 E 5145 33
90 54 9 N 85 41E 5226 58
70 53 48 N 85 52 E 5307 46
16 53 6 N 85 58 E 5387 86
89 52 17 N 84 39 E 5467 29
15
0 26
0 34
0 74
0 69
I 40
0
0
1
0
1
45
25
56
65
27
514.07 N 4792 04 E 4819.54 N 83 53 E
521 56 N 4873
528
534
539
545
551
556
563
57O
43 N 4954
23 N 5036
22 N 5118
06 N 5199
06 N 5279
65 N 5360
42 N 5439
38 N 5517
37 E 4901.20 N 83 53 E
75 E 4982.85 N 83 55 E
46 E 5064.72 N 83 57 E
26 E 5146.58 N 83 59 E
30 E 5227.80 N 84 I E
96 E 5308.64 N 84 3 E
17 E 5389.00 N 84 4 E
32 E 5468.42 N 84 5 E
87 E 5547.27 N 84 6 E
9000.00 6381.33 6331 33 52 33 N 85 20 E 5625 43
9100 O0 6442.32 6392
9200 O0 6503.53 6453
9300 O0 6563.79 6513
9400 O0 6624.60 6574
9500 O0 6686.16 6636
9600 O0 6747.64 6697
9700.00 6808.69 6758
9800.00 6870.03 6820
9900.00 6931.90 6881
32 52 17 N 85 26 E 5704
53 52 30 N 84 54 E 5783
79 53 0 N 83 56 E 5863
60 52 20 N 84 25 E 5942
16 51 48 N 84 33 E 6021
64 52 11 N 83 56 E 6100
69 52 17 N 83 33 E 6179
03 51 49 N 83 47 E 6258
90 51 52 N 83 53 E 6337
68
76
54
91
72
58
75
69
23
0 4O
0 23
2 56
0 78
1 14
0 54
I O6
0 79
1 51
0 89
576.88 N 5596 89 E 5626 54 N 84 7 E
583.28 N 5675
589 64 N 5754
597 75 N 5834
605 74 N 5913
613 21N 5991
621 12 N 6069
629 83 N 6148
638 60 N 6227
546 97 N 6305
88 E 5705
70 E 5784
08 E 5864
07 E 5944
52 E 6022
99 E 6101
71E 6180
20 E 6259
31E 6338
77 N 84 8 E
83 N 84 9 E
63 N 84 9 E
01 N 84 9 E
82 N 84 9 E
69 N 84 9 E
89 N 84 9 E
86 N 84 9 E
42 N 84 8 E
10000.00 6992.92 6942 92 52 37 N 84 1 E 6416 43
10100.00 7053.31 7003 31 53 28 N 85 10 E 6496
10200.00 7112.39 7062 39 53 39 N 86 11 E 6576
10300,00 7172.22 7122 22 52 52 N 86 42 E 6656
10400.00 7231.76 7181 76 54 19 N 86 57 E 6737
10500.00 7290.23 7240 23 53 46 N 87 45 E 6818
10600.00 7350.00 7300 O0 53 7 N 88 57 E 6898
10700.00 7408.35 7358.35 55 39 N 88 47 E 6979
10800.00 7464.81 7414.81 55 27 N 89 5 E 7061
10900.00 7521.70 7471.70 55 7 N 88 49 E 7143
13
8O
91
22
29
34
37
74
81
0 54
2 48
0 79
I O3
I 3O
1 83
I 29
I 16
0 72
0 52
655.38 N 6384 09 E 6417 64 N 84 8 E
663.08 N 6463
669.01N 6543
673.97 N 6623
678.40 N 6704
682.27 N 6785
684.50 N 6865
686.05 N 6946
687.53 N 7028
689.12 N 7111
42 E 6497
88 E 6577
85 E 6658
07 E 6738
10 E 6819
24 E 6899
42 E 6980
95 E 7062
17 E 7144
34 N 84 9 E
99 N 84 10 E
O5 N 84 11E
31 N 84 13 E
31 N 84 15 E
28 N 84 18 E
22 N 84 22 E
49 N 84 25 E
48 N 84 28 E
11000.00 7579 19 7529 19 54 49 N 88 58 E 7225.46
11100.00 7636
11200.00 7693
11300.00 7753
11400.00 7811
11500.00 7870
11600.00 7927
11700.00 7982
118OO O0 8036
61 7586
96 7643
01 7703
84 7761
11 7820
25 7877
41 7932
58 7986
11900 O0 8091 65 8041
61 55 0 N 87 40 E 7307 21
96 54 48 N 87 11 E 7389
O1 53 23 N 86 40 E 7469
84 54 13 N 86 46 E 7550
11 54 34 N 86 44 E 7631
25 55 49 N 87 12 E 7713
41 57 7 N 87 55 E 7797
58 56 52 N 88 5 E 788I
65 56 27 N 87 53 E 7964
O7
74
57
81
84
18
13
51
O. 90
0.36
I . 73
1 . 08
0 75
0 77
1 40
I 43
0 87
0 81
690.55 N 7192 98 E 7226 05 N 84 31 E
693.06 N 7274
696.62 N 7356
701.10 N 7437
705.65 N 7517
710.27 N 7599
714.70 N 7681
718.30 N 7764
721.06 N 7848
723.97 N 7931
81 E 7307 75 N 84 33 E
65 E 7389 56 N 84 35 E
23 E 7470 20 N 84 37 E
96 E 7551 O0 N 84 38 E
10 E 7632 22 N 84 40 E
04 E 7714.22 N 84 41 E
37 E 7797.53 N 84 43 E
38 E 7881.44 N 84 45 E
80 E 7954.77 N 84 47 E
COMPUTATION DATE: 31-AUG-g3 PAGE 4
ARCO ALASKA, INC.
PI-05 / J7 ST #1
POINT MCINTYRE
NORTH SLOPE, ALASKA
DATE OF SURVEY: 12-AUG-1993
KFliy BUSHING ELEVATION: 50.00 FI'
ENGINEER: JEFF FORMICA
INTERPOLAIF_D VALUES FOR EVEN 100 FEET OF MEASURED DEPTH
1-RUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZI~[rrH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IOO FEET FEET FEET DEG MIN
12000 O0 8146 75 8096 75 56 25
12100
12200
12300
12400
12500
12600
12700
12800
12900
O0 8202
O0 8258
O0 8316
O0 8375
O0 8435
O0 8495
O0 8553
O0 8613
O0 8675
44 8152
85 8208
56 8266
59 8325
25 8385
04 8445
84 8503
48 8563
20 8625
44 55 52
85 55 25
56 54 23
59 53 32
25 53 0
04 53 47
84 53 57
48 52 40
20 51 1
N 87 22 E 8047 89
N 88 1E 8130
N 89 16 E 8213
S 88 55 E 8294
S 88 35 E 8374
S 89 28 E 8454
N 87 28 E 8534
N 84 55 E 8615
N 85 37 E 8695
N 86 30 E 8774
88
31
66
89
76
71
58
85
51
0 81
0 95
2 44
I 84
1 42
1 14
3 87
0 34
1 62
1 57
727 65 N 8015 17 E 8048 13 N 84 49 E
731
733
732
73O
729
730
736
743
748
05 N 8098
13 N 8180
77 N 8262
62 N 8343
41N 8423
42 N 8503
32 N 8584
O1N 8664
40 N 8742
16 E 8131
7O E 8213
36 E 8294
O5 E 8374
29 E 8454
43 E 8534
09 E 8615
08 E 8695
57 E 8774
09 N 84 51E
49 N 84 53 E
79 N 84 56 E
98 N 85 0 E
82 N 85 3 E
74 N 85 5 E
61 N 85 6 E
88 N 85 6 E
54 N 85 6 E
13000 O0 8738 51 8688 51 50 51
13100 O0 8800
13200 O0 8861
13300 O0 892O
13400 O0 8977
13500 O0 9033
13600 O0 9089
13700 O0 9145
13750 O0 9173
97 8750
68 8811
73 8870
93 8927
95 8983
44 9039
31 9095
19 9123
97 51 59
68 53 16
73 54 20
93 55 49
95 56 20
44 56 0
31 56 7
19 56 7
N 87 43 E 8851 88
N 88 0 E 8929
N 87 52 E 9009
N 87 48 E 9089
N 87 28 E 9171
N 86 46 E 9254
N 86 18 E 9337
N 85 59 E 9420
N 85 59 E 9462
89
25
88
83
62
79
71
22
0 83
1 07
0 47
1 58
1 23
1 oo
3 25
0 O0
0 O0
752 33 N 8819 87 E 8851 90 N 85 7 E
755
758
761
764
768
773
779
782
16 N 8897
06 N 8977
11N 9057
50 N 9139
67 N 9222
70 N 9305
39 N 9388
29 N 9429
91E 8929
31E 9009
96 E 9O89
91E 9171
64 E 9254
68 E 9337
42 E 9420
82 E 9462
90 N 85 9 E
26 N 85 10 E
88 N 85 12 E
83 N 85 13 E
62 N 85 14 E
79 N 85 15 E
71 N 85 15 E
22 N 85 15 E
ARCO ALASKA, INC.
P1-05 / J7 ST #1
POINT MCINTYRE
NORTH SLOPE, ALASKA
T~UE SUB-SEA COURSE
MEASURED VEETICAL VEETICAL DEVIATION AZI~JTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
O. O0
1000.00 998
2000.00 1965
3000.00 2797
4000.00 3424
5000.00 4025
6000.00 4617
7000.00 5210
8000.00 5791
82 948
61 1915
78 2747
77 3374
90 3975
09 4567
61 5160
54 5741
9000.00 6381.33 6331
COMPUTATION DATE: 31-AUG-93 PAGE 5
DATE OF SURVEY: 12-AUG-1993
,/~~m.~ .... KELLY BUSHING ELEVATION' 50.00 FT
~ ~. ~,~.r~, ~ ~ ;~ r,:~ ~ . ~' ,'
~'-- ~ ENGINEI=R' JEFF FORMICA
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
0 O0 -50 O0 0 0
82 6 45
61 24 2
78 44 12
77 52 42
90 52 45
O9 53 34
61 ,54 15
54. ,.54 42
33 52 33
N 0 0 E 0.00
N 87 50 E 33.68
N 82 35 E 275.14
N 84 37 E 819.46
N 83 26 E 1596.86
N 83 27 E 2395.93
N 81 32 E 3200.95
N 84 I E 4004.33
N 84 35 E 4818.15
N 85 20 E 5625.43
O. O0
3 43
3 O0
0 90
0 61
3 98
0 6O
0 21
0 26
0 4O
0 O0 N
15
71
134
206
321
432
514
576
0 O0 E
83 S 34
93 N 274
01N 816
52 N 1591
88 N 2386
41N 3185
75 N 3982
07 N 4792
88 N 5596
0 O0 N 0 0 E
36 E 35 03 S 78 46 E
77 E 275 23 N 86 41 E
38 E 819 46 N 85 2 E
19 E 1596 86 N 85 10 E
99 E 2395 94 N 85 3 E
28 E 3201.45 N 84 14 E
17 E 4005.62 N 83 48 E
04 E 4819.54 N 83 53 E
89 E 5626.54 N 84 7 E
10000.00 6992.92 6942.92 52 37
11000.00 7579.19 7529.19 54 49
12000.00 8146.75 8096.75 56 25
13000.00 8738.51 8688.51 50 51
13750.00 9173.19 9123.19 56 7
N 84 I E 6416.43
N 88 58 E 7225.46
N 87 22 E 8047.89
N 87 43 E 8851.88
N 85 59 E 9462.22
O. 64
O. 9O
0.81
O. 83
O. O0
655.38 N 6384.09 E 6417.64 N 84 8 E
690.55 N 7192.98 E 7226.05 N 84 31 E
727.65 N 8015.17 E 8048.13 N 84 49 E
752.33 N 8819.87 E 8851.90 N 85 7 E
782.29 N 9429.82 E 9462.22 N 85 15 E
COMPUTATION DATE' 31-aUG-93
PAGE 6
ARCO ALASKA, INC.
P1-05 / J7 ST #1
POINT MCINTYRE
NORTH SLOPE, ALASKA
DATE OF SURVEY' 12-AL~-1993
KELLY BLLSHING ELEVATION' 50.00 FT
ENGINEER' JEFF FORe'ICA
INTERPOLAll~I) VALUES FOR EVEN iO0 FEET OF SUB-SEA DEPTH
TEUE SUB-SEA COURSE
MEASUEED VEETICAL VERTICAL DEVIATION kZI~rrH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
0 O0
50 O0
150 O0
25O oo
350 01
450 01
550 03
650 09
750 27
850 53
0 O0
50 O0
150 O0
250 O0
350 oo
450 O0
550 O0
650 O0
750 O0
850 O0
-50.00 0 0 N 0 0 E
0.00 0 13 S 60 41 E
100.00 0 17 S 62 38 E
200.00 0 22 S 65 18 E
300.00 0 33 S 66 46 E
400.00 0 47 S 63 35 E
500.00 I 34 S 70 39 E
600.00 2 35 S 73 22 E
700.00 3 52 S 77 7 E
800.00 4 30 S 80 45 E
0 O0
0 03
0 38
0 91
I 64
2 63
4 41
7 56
13 15
20 12
0 oo
0 26
0 oo
0 O0
0 oo
0 36
0 54
2 01
0 60
0 89
0.00 N
0.01 N
0.22 S
0.43 S
0 75 S
I 22 S
I 98 S
3 04 S
4 50 S
5 92 S
0 O0 E
0 03 E
0 40 E
0 g5 E
171E
2 74 E
4 59 E
7.84 E
13.57 E
20.68 E
000 N O O E
0
0
1
1
3
8
14
21
03 N 74 5 E
46 S 60 47 E
04 S 65 39 E
86 S 66 24 E
O0 S 65 55 E
O0 S 66 39 E
41 S 68 47 E
30 S 71 40 E
51 S 74 I E
950 90
1051
1152
1254
1355
1457
1560
1664
1769
1875
950 O0
62 1050 O0 1000
77 1150 O0 1100
O0 1250 O0 1200
45 1350 O0 1300
62 1450 O0 1400
85 1550.00 1500
59 1650.00 1600
33 1750.00 1700
23 1850.00 1800
900 O0 5 30
O0 ' 8 13
O0 8 49
O0 9 5
O0 10 30
O0 13 12
O0 14 59
O0 16 8
O0 18 18
O0 20 15
S 87 51E
N 85 37 E
N 85 38 E
N 86 33 E
N 88 27 E
N 85 35 E
N 80 27 E
N 83 3 E
N 85 31E
N 85 7 E
28.49
40.45
55 64
71 34
88 39
109
134
162
193
228
31
84
35
48
31
2 40
1 44
0 O2
0 64
2 13
3 45
0 38
2 55
I 34
2 O0
6 85 S
6
5
4
3
2
O
5
7
10
40 S 41
22 S 56
13 S 71
43 S 88
61S 109
93 N 135
07 N 162
96 N 193
71N 228
29 16 E 29 95 S 76 47 E
12 E 41 62 S 81 9 E
27 E 56 51 S 84 42 E
93 E 72 04 S 86 43 E
98 E 89 05 S 87 48 E
90 E 109 93 S 88 39 E
22 E 135.23 N 89 36 E
49 E 162.57 N 88 13 E
49 E 193.65 N 87 39 E
21 E 228.46 N 87 19 E
1982 92 1950 O0 1900.00 23 31
2093
2205
2318
2433
2551
2673
2799
2933
3073
29 2050
28 2150
37 2250
40 2350
99 2450
96 2550
06 2650
75 2750
29 2850
O0 2O00.00 26 11
O0 2100.00 27 13
O0 2200.00 28 50
O0 2300.00 30 21
O0 2400.00 34 31
O0 2500.00 35 9
O0 2600.00 39 56
O0 2700.00 43 27
O0 2800.00 45 0
N 82 40 E 268.22
N 83 8 E 314.87
N 84 13 E 365.24
N 82 55 E 418.03
N 82 46 E 474.82
N 84 1E 538.46
N 85 16 E 608.28
N 86 7 E 683.38
N 84 23 E 773.56
N 85 2 E 870.87
2 98
1 23
0 70
2 48
2
1
0
5
1
2
04
46
84
12
61
04
15 04 N 267 89 E 268.31 N 86 47 E
20
26
32
39
46
53
58
66
75
95 N 314
44 N 364
10 N 416
35 N 473
74 N 536
28 N 605
77 N 680
59 N 770
67 N 867
21E 314.91 N 86 11E
31E 365.26 N 85 51E
81 E 418.04 N 85 36 E
19 E 474.82 N 85 15 E
43 E 538.47 N 85 I E
95 E 608.29 N 84 59 E
85 E 683.38 N 85 4 E
70 E 773.57 N 85 4 E
58 E 870.88 N 85 I E
3221.20 2950 O0 2900 O0 49 46
3381.43 3050 O0 3000
3546.52 3150 O0 3100
3712.54 3250 O0 3200
3877 03 3350 O0 3300
4041 66 3450 O0 3400
4207 32 3550.00 3500
4373 O0 3650.00 3600
4539 42 3750.00 3700
4707 02 3850.00 3800
O0 52 28
O0 52 58
O0 52 54
O0 52 30
O0 52 46
O0 53 2
O0 52 54
O0 53 19
O0 53 25
N 87 15 E 979.76
N 85 28 E 1104 89
N 85 39 E 1236
N 86 15 E 1368
N 83 1E 1499
N 83 44 E 1630
N 84 2 E 1762
N 84 40 E 1894
N 85 13 E 202'7
N 85 37 E 2161
24
74
30
OO
O3
12
14
63
3 O3
1 60
0 86
0 76
0 26
0 53
0 37
0 37
0 74
0 34
82 63 N 976.27 E 979.76 N 85 10 E
89
101
109
122
138
152
165
177
187
90 N 1101.23 E 1104.89 N 85 20 E
14 N 1232.10 E 1236.25 N 85 18 E
98 N 1364.32 E 1368 75 N 85 23 E
86 N 1494.26 E 1499 30 N 85 18 E
23 N 1624.13 E 1630 O0 N 85 8 E
13 N 1755.47 E 1762 05 N 85 3 E
31 N 1886.91 E 1894 13 N 85 0 E
05 N 2019.42 E 2027 16 N 84 59 E
57 N 2153.50 E 2161 65 N 85 1 E
ARCO ALASKA, INC.
P1-O5 / J7 ST #1
POINT MCINTYRE
NORTH SLOPE, A~KA
COMPUTATION DATE' 31-AUG-93
PAGE 7
DATE OF SURVEY: 12-AUG-1993
KELLY BUSHING ELEVATION: 50.00 FI'
ENGINFFR: JEFF FOR~IICA
INTERP0~TED VALUES FOR EVEN 100 FEET OF SB3-SEA DEPTH
TRUE SUB-SEA COUESE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
4873 88 3950 O0 3900 O0 53 8
5039
5207
5373
5545
5716
5886
6055
6222
6387
8O 4050
16 4150
73 4250
18 4350
44 4450
59 4550
53 4650
65 4750
54 4850
O0 4000
O0 4100
O0 4200
O0 4300
O0 4400
O0 4500
O0 4600
O0 4700
O0 4800
O0 52 45
O0 53 22
O0 53 50
O0 54 18
O0 54 23
O0 53 56
O0 53 42
O0 52 56
O0 52 57
6557 05 4950 O0 4900 O0 54 9
6726
6896
7067
7239
7410
7582
7756
7928
8101
60 5050
27 5150
62 5250
74 5350
60 5450
93 5550
23 5650
35 5750
33 5850
O0 5000
O0 5100
O0 5200
O0 5300
O0 5400
O0 5500
O0 5600
O0 5700
O0 5800
O0 53 32
O0 54 19
O0 54 32
O0 54 9
O0 54 24
O0 54 37
O0 54 41
O0 54 22
O0 54 47
8274 95 5950.00 5900.00 55 10
8448 87 6050 O0 6000.00 54 17
8619 11 6150
8785 46 6250
8948 46 6350
9112 55 6450
9277 05 6550
9441.44 6650
9603.86 6750
9767.45 6850
O0 6100.00 53 45
O0 6200.00 52 22
O0 6300.00 52 32
O0 6400.00 52 16
O0 6500.00 53 6
O0 6600.00 52 1
O0 6700.00 52 12
Op 6800.00 52 12
9929.43 6950 O0 6900 O0 52 14
10O94 43 7050
10263
10431
10600
10773
10949
11123
11294
11465
08 7150
31 7250
O0 7350
86 7450
34 7550
35 7650
96 7750
37 7850
O0 7000
O0 7100
O0 72OO
O0 7300
O0 7400
O0 7500
O0 7600
O0 7700
O0 7800
O0 53 22
O0 53 8
O0 54 24
O0 53 7
O0 55 33
O0 54 52
O0 55 2
O0 53 20
O0 54 27
N 85 28 E 2295 22
N 82 23 E 2427
N 81 49 E 2561
N 81 12 E 2694
N 82 7 E 2833
N 82 5 E 2972
N 81 45 E 3109
N 81 27 E 3245
N 81 6 E 3379
N 80 58 E 3509
57
56
45
46
27
69
58
16
89
N 82 6 E 3646 47
N 82 23 E 3783
N 83 55 E 3920
N 84 6 E 4059
N 84 8 E 4199
N 84 27 E 4337
N 84 11E 4478
N 84 16 E 4619
N 84 28 E 4759
N 84 56 E 4900
20
17
28
35
86
19
71
77
91
N 86 9 E 5042 84
N 85 47 E 5185 10
N 85 56 E 5322 87
N 84 37 E 5455 79
N 85 19 E 5584 50
N 85 27 E 5714 61
N 83 54 E 5845 21
N 84 35 E 5975 65
N 83 54 E 6103 63
N 83 38 E 6233.05
N 83 53 E 6360.43
N 85 5 E 6491.64
N 86 32 E 6627.43
N 87 6 E 6762.65
N 88 57 E 6898 34
N 89 4 E 7040 24
N 89 3 E 7184 14
N 87 38 E 7326 33
N 86 40 E 7465 70
N 86 45 E 7603 63
0 32
1 26
0 75
I 7O
0 37
0 21
0 5O
0 38
0 35
I 96
0 75
0 35
0 30
0 63
0 20
0 56
I 06
0 27
0 76
0 35
0 . 88
O. 64
0.59
0 46
O. 57
O. 23
0 35
0 91
1 14
1 O9
I 64
2 66
0 75
0 64
1 29
0 59
0 69
0 40
0 86
0 65
198 01 N 2286 67 E 2295 23 N 85 3 E
210
229
249
269
288
308
328
348
369
83 N 2418
40 N 2551
40 N 2683
48 N 2820
72 N 2958
16 N 3094
04 N 3229
32 N 3361
42 E 2427
32 E 2561
02 E 2694
83 E 2833
52 E 2972
81E 3110
51E 3246
86 E 3379
59 N 85 I E
62 N 84 52 E
58 N 84 41E
67 N 84 33 E
58 N 84 26 E
11 N 84 19 E
13 N 84 12 E
86 N 84 5 E
08 N 3491 32 E 3510 77 N 83 ~ E
389 07 N 3626 71 E 3647 52 N 83 53 E
407
423
438
452
466
480
494
508
521
57 N 3762
88 N 3898
42 N 4036
85 N 4176
57 N 4314
17 N 4453
51N 4594
50 N 4733
65 N 4874
38 E 3784
46 E 3921
84 E 4060
19 E 4200
04 E 4339
73 E 4479
54 E 4621
92 E 4761
39 N 83 49 E
44 N 83 48 E
57 N 83 48 E
67 N 83 49 E
20 N 83 50 E
54 N 83 51E
07 N 83 51E
16 N 83 52 E
45 E 4902 29 N 83 53 E
532.88 N 5015 94 E 5044 17 N 83 56 E
541 95 N 5157 93 E 5186
552 16 N 5295 33 E 5324
562 34 N 5427 87 E 5456
573 54 N 5556 09 E 5585
584 07 N 5685 77 E 5715
595 81 N 5815.85 E 5846
608 88 N 5945.66 E 5976
621 44 N 6073.03 E 6104
33 N 84 0 E
04 N 84 3 E
92 N 84 5 E
62 N 84 6 E
69 N 84 8 E'
29 N 84 9 E
75 N 84 9 E
74 N 84 9 E
635.78 N 6201.70 E 6234 21 N 84 9 E
649.44 N 6328 38 E 6361.62 N 84 8 E
662 72 N 6458
672
679
684
687
689
693
700
708
22 N 6594
72 N 6729
50 N 6865
18 N 7007
87 N 7151
85 N 7293
86 N 7433
67 N 7570
95 E 6492.86 N 84 9 E
42 E 6628.59 N 84 11E
48 E 6763.72 N 84 14 E
24 E 6899.28 N 84 18 E
41 E 7041.02 N 84 24 E
58 E 7184.77 N 84 29 E
92 E 7326.85 N 84 34 E
19 E 7466.16 N 84 37 E
95 E 7604.05 N 84 39 E
COMPUTATION DATE: 31-AUG-93 PAGE 8
ARCO ALASKA, INC.
Pl-05 / J7 ST #1
POINT MCINIYRE
NORTH SLOPE, A~KA
DATE OF SURVEY: 12-AUG-1993
KELLY BUSHING ELEVATION: 50.00 FT
ENGINFFR: JEFF FORMICA
INll~RPOLAll~D VALUES FOR EVEN 100 FEE-r OF SUB-SEA DEPTH
TRUE SLEt-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZINJJTH
DEPTH DEPTH DEPTH DEG WIN DEG MIN
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARllJ~E
SECTION SEVERITY NORTH/SOUTH FAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
11640 79 7950 OO 7900 O0 56 27
11824
12005
12184
12356
12524
12693
12859
13018
13180
50 8050
88 8150
38 8250
90 8350
53 8450
48 8550
64 8650
22 8750
53 8850
O0 8OO0
O0 8100
O0 8200
O0 8300
O0 840O
O0 8500
O0 8600
O0 8700
O0 8800
O0 56 41
O0 56 23
O0 55 33
O0 53 39
O0 53 1
O0 53 58
O0 51 44
O0 50 58
O0 53 2
N 87 28 E 7747 67
N 88 0 E 7901
N 87 23 E 8052
N 88 59 E 8200
S 88 17 E 834O
S 89 51E 8474
N 84 57 E 8610
N 86 11E 8743
N 87 50 E 8866
N 87 55 E 8993
60
79
47
43
28
31
O0
O0
70
2 22
0 76
0 85
I 65
0 93
1 85
0 43
2 29
0 95
1 61
716 28 N 7714 86 E 7748.04 N 84 42 E
721
727
732
731
729
735
746
752
76 N 7868
88 N 8020
92 N 8167
60 N 8308
29 N 8442
86 N 8578
39 N 8711
88 N 8834
757.49 N 8961
86 E 7901.89 N 84 46 E
06 E 8053.03 N 84 49 E
83 E 8200.65 N 84 52 E
38 E 8340.53 N 84 58 E
89 E 8474.32 N 85 4 E
84 E 8610.34 N 85 6 E
11 E 8743.03 N 85 6 E
O0 E 8866.02 N 85 8 E
75 E 8993.71 N 85 10 E
13350.70 8950.00 8900.00 55 7
13528.98 9050.00 9000.00 56 23
13708.41 9150.00 9100.00 56 7
13750.00 9173.19 9123.19 56 7
N 87 38 E 9131.24
N 86 40 E 9278.74
N 85 59 E 9427.69
N 85 59 E 9462.22
i . 46
O. 80
0. O0
O. O0
762.75 N 9099.32 E 9131.24 N 85 13 E
770.05 N 9246.73 E 9278.74 N 85 14 E
779.88 N 9395.38 E 9427.69 N 85 15 E
782.29 N 9429.82 E 9462.22 N 85 15 E
COMPUTATION DATE: 31-AUG-93 PAGE g
ARCO ALASKA, INC.
P1-05 / J7 ST #1
POINT MCINTYRE
NORTH SLOPE, ALASKA
INTERPOLATED VALUES FOR CHOSEN HORIZONS
DATE OF SURVEY: 12-AUG-1993
KFlly BUSHING ELEVATION: 50.00 FT
ENGINEER: JEFF FORe, ICA
IVlARKER
GCT LAST READING
TD
SURFACE LOCATION = 1458' FSL ~ 697' FEL, SECl6 T12N R14E
MEASURED DEPTH I'VD RECTANGULAR COORDINATES
BELOW KB FROM KB SUB-SEA NORTH/SOUTH EAST/WEST
13650.00 9117.44 9067.44 776.48 N 9347.01 E
13724.00 9158.69 9108.69 780.78 N 9408.29 E
ARCO A~KA, INC.
PI-05 / J7 ST #1
POINT MCIN1-YRE
NORTH SLOPE, AL~KA
lVlARKER
COMPUTATION DATE: 31-AUG-93 PAGE 10
,;i~i:.;.i!,i,.il:[;,.::i DATE OF SURVEY' 12-AUG-1993
~':" I':~: KFIIY BUSHING ELEVATION- 50.00 ET
,,,,,~,~¢~,
,',"tt
ENGINEER: JEFF FORe, ICA
************ STRATIGRAPHIC SI~MARY
SURFACE LOCATION = 1458' FSL & 697' FEE, SEC16 T12N R14E
NEARED DEPll~ I'VD RECTANGULAR COORDINATES
BELOW KB FROM KB SUB-SEA NOR-FH/SOLr~H EAST/WEST
13724.00 9158.69 9108.69 780.78 N 9408.29 E
FINAL WELL LOCATION AT TD:
TRUE SUB-SEA
MEASURED VERTICAL VERTICAL
DEPTH DEPTH DEPTH
HORIZONTAL DEPARTURE
DISTANCE AZIMUTH
FEET DEC
13750.00 9173.19 9123.19 9462.22 N 85 15 E
DIRECTIONAL SURVEY
COMPANY
ARCO ALASKA, INC.
FIELD
POINT MClNTYRE
WELL
P1-05 / J7 ST #1
COUNTRY USA
RUN ONE
DATE LOGGED 12 - AUG - 93
DEPTH UNIT FEET
REFERENCE 93369
Interpretations are oplrHon$ baa~d on lnfererlc~ from electrical or o~ mea,~ur~'nent~ and we cannot, and do not
guarantee the accur~-y or cor~ctne~ of any Interpretations. and we Ihall nc~, except In th~ cae~ of gro~e or wllfull
negligence on our pert. be liable or r®sponslble for any loss. coet~, dlLmage~ or expense~ Incurre~l or su~talr'4~cl by
anyone resulting from any interpretation made by any of our officers, agent~= o~ smploye~, Thee~ Interpretation lu's
al~o subject to our GeneraJ Terms and Conditions aa sd out In our current prtc~ ~chedule.
E'ELL: P1-O5/J7 ST ~1
(1458~, FSL & 697' FEL, SEC , T12N, R14E)
HORIZOflTAL PROdECTIOII
6OOO
4O0O
20O0
-2000
-4OOO
-80OO
SOUTH -8000
-4000
SCALE = I / 2000 IN/FT
-~..,..,..i ......................... ..... ~...i...!...~ ...... ~+.~-.! ...... i.-.!..-i...?..~...~...i..+..~ ...... ~...~...i...~ .... i...~..~...~ .... !---!-.-!---i .... i-i'-!"! ~..i.-i-i .... i.i--.i-.~ ...... i-..!--'i...i ..... !--'!'..i.--i ...... i--i..!-.-i ....
i: i i ?i i'i ?i':' '[ i"i i "i'[i! 'i"i i"!· ''~ ~ ~ : ~-~.?~ ...... i i i !.-!..i.!...i ..... !-!-!-i ..... !---i-i--i.- i !..i...! ..... ;--!-i.~ -: i.i !.. i i i !
: . .... : , , ,-., . ,. .... -,, ,-,.. i.~.; ~. i i i · i i ~ i i.i i i .i i i i .~..i f.i .i.i..~ i .... i..i..f i .i..i.i i
:i : :'::::i ,::.: :::: .:: ....
~:t~--i--~.~ ~--~--:--~-i.i--i~ ..-:.~.,,.;~---~ ...... ~-i-i ..... ~-ii--! ..... !..~.i ...... i.-.i-.!.--~ .... !.--!...!...~ ...i...;...i.; ...... ;...~...~..:..ii.[[ i'i!!)
,!!! !:~I'~! .! [; ,,i, : :i,i ~, ~:.: ~..~ iii' i,
i::: !:i · i "!i'::'i' !- ; ,!!i ii-!! i-.~.;: i..;-;-i-i-.i.--i--.i .ii..-!-.~ .... !--.i...i.-.i ...i .... i!.~ .... ;...i~
.... , f-" ~,~ [?~i'r~ :-! i ; i-i i.; ;.i- .; ................................... i.:
! · . : ; i i-- ! ! ! ; -: ; ; :: ! : ! ! i ; '' !i , ; ; i ; i i i i i ; ;..i...;..i i..; i i i i ; i : ,
-- . ! . -- , [.: ]'' :. .:! :: .
' ' :'~' "~ ' ; : i ' : ' ' ' i : ;" ' : ' i'i ' ' ! i ' : !':': :'i !'i ; ' i ~ i'!"i': .... :'"!":'!' "! i :'~'i"' : · :t
....... i ........ : ,.: : . . : . . . ] . . : ~.l ; : : i ..... ]...;...;.;...i .... : .... ; . .. [., , i ....
' :-; i ' ~.. il .... ~ .... : .... ' i ...... :.: ;. :!.i!..: ;;: i.. i. . '
' i .... i : i' : ! : .... i '"i' "!' 'i':': : ; ~ ' ; ! ; i ;"!":"i" i"! !'~ ~-'!"!-'-~ ...... !'"!'"i'"i .... !"!'"!'"i ......
::. :!::~:...::ti :tt:z~! ,..l..; ...i...: t i :.7.ii ..; itl .... i..i...i...; ..... i...i..i.!...i..L;..;~.~.~,~~: ;. i~
· ~ ~: -~: ..... ~- :..-l~~~e~i~ T';:i::'i:"i:'i-':;::i:: !:;' ::il !.
, .... t ' , ' · ' : ..... , · ,-, - ' , .... · . ! , · , :
.... ~ ~~; .... .,'1 i ....... : : ,..~ .....
,
.i. ' . '.~:' ' '.: ~ ~..:
!'!'~"'!'""!'"I ...... !'"!'"'"'~ .... :'"'!!'"!"iI'! ...... I'-!-!! .... !":'!~ !'!!'~i!"'?!! .... !-!"!'! ...... ! !'"1 ..... !'7"! !"!"!-! .... !!~
' ':' ' ' 1'
-- ':ii ..i !
i ~.i.!.~ ~..i...i...i ...... i...i...i...;..i.i i.! ~ i : :.~ .: ,~ i , , i , ~.~.i .... : ~.: i : i i : ; , . : ~ ~ ,.: i.i..i ~ .... ~.: ~ ~ :.. i i
1
·
-2000 0 2000 4000 6000 8000 10000 12000
WEST FAST
~'ELL: P1-O5/J7 ST #1
(1458' FSL *& '697~' FEL, SF?'~6, T12N, R14E)
YERTICAL PROdE£TIOII
-40OO -C~300 0 0 20OO 4OOO 6(XX) 80(X) 1000~
........................ i!.~.i .... i..i.*-!--i ...... i--.!---i.--i ...... i.--i---i---i-*.-i..i-.i..i .i--!.i-.-! .... i!'-ii' 'i!'i'i i!-i~*'-ii-"ii i-'i-!---i-'i'-i"-i'-i .... i'"!"i-'-!- i.!'i~ ~;~; .i~i,.
!ii"!'ii'i*'i'"!"! ...... !'"i'"h'!"'!'"!"!"*!~!~"*!"!'"}'"i"l'i'i"i'"i ..... }"i'ii"*i"¢';i'"}'}"i'! "!'"i'!'"i .... i"'!"i .... i"i'¢'"i i';';; ;!;:
:~---i!-i-!--}--i---,---i-i---i--! ..... !-? .... i-~'i~:-3~'--','-!-!--i-'-!--:'ii'-!--! ...... i---!'--? .... ?}'-i-"} ..... i-'-!---i"*i ...... i"i"-?! ..... ?--i'-'!'-'!'--!'}~i .....
: ; ; : ; i i i ..i i ;..i i-! i i .: ~ ; ; F,.i i ; ~ i i..i ~ i i.i..i ..i.~..i i..,.i i i i...i.i..i i ..i.i..i...i ..i.i.;.' i : i ; ' ' ·
. : : : .... ~ -:-: : : : : : : ; ; i ; ; i ; i ! ; i i ! ..........
.... ::::
ii}} .i}~!..~}}.}.; ;.!~.! ~i.!.! .~.~,i.i!i ~i~a..i.l.i..i.!..i.i i..i.i.i .... !..i.i..i ..... i..i..Li~ .~:~: ......
.................... ::.: :::: :::: :::: :::: : .
;~! ~.!-!---!---i.-!!-~ :!:~ -!~-~,,-~;~ .!-~-~..,.~:-i-.:..~-~.~--~.--~-.~...i .... i.:i--~ ...... ~..*h~.~...~-i..i..: .......
-. : .- !::i:,i! ' :::' i: ~ii: : :!-
i i i i i.i..;..i i ;.; i .~. i ~ ~ i, ; ..~-i i i i ~ ~ ; i i ; : .i !..,i i .i..~ :..i...i..;.!.;..Li.i..i .... ;.~.i.; . : : .....
: : . ~ : : : : · . : , . i : . i : i · : i · i ~ i ~ ~i,~ : ! - : . i i i ! :
...... , ......... ~.i ...... i..;...~..i.~,i~ .... : ......... : ........ i...;._i.,,~ ...... i..i...;...i .... ~,.ii..~ ..... i...i...:...~_-...i..i..+.} ..... i...i._i...i ..... ~..,i..,i...; ...... i...i...i...~ ·
· - · :: :::: :::: .... :'' i .... :
~ i i'1 i "! ....... !-'i"'i'!'~ !! i"i'~;:!' '! ....... !"-! ........... i ...... !-i-.-! ..... i ..... !"'i"'~i~;"i i'~ ~'"i ...... !"i'"i'"! .... ! i ': ~: ~ ''~ "' !'
:!-'i: i':-~:-'-! ..... i"?':"'--m ..... :'i'"i ..... i'i"i"i"'"'~'i'i'! ..... i'i"i'~"'7;;'"!"I'"i':'"!'i ..... i"i"i'"?~'-:~'!"~l~o~"'i"!i ...... .;ll;i:
..... ~.. ~.; : :. :.~ ~ ....... ; ;.~} ; ..... ; ,.: ;..~ ~ . . :..:.~.~.~ ~..~..'~. . . .
.... ~ ~i~('''~;~ ~';';; ~'::' : ·: =: ~ :;:' : ' . .............
. . : : . : .. ; : . . . ; . ,...: ...,.:.: :...; : :..:..~ . . : ..... : . .; ............. /
· . ~:- . ..~::- ::;: .... :
. : :: ~:~; :: : . . .
-: : ; .~.~..~...~ ..... h..i...~..; ..... L.; ~.;...~ ~ h.~ .... ~.~.~.~ ...... ~.;.; ;.. ~ ~ ~..~. ~ ; ;.; .;.~..;.~ ..... ,..; ~ , ..i ~...h.~ ~ ; ; ....
'::: ;.~.~.--i ..... ;..i---~.;.. ; ....... ; ...;;-;;..-;...~-;.~ .;~.;-; :.;; '::;..;. ;.;.;~ .... ;:.; .:..;;.; .;.::. .
· . ~ : : . ....
:.;~ ];:~ ;~: : :.: ..... ~ ~... : :
(
....... . . : ..... :
..... ...... ............ , ......
:: :::: -:.:~::.
:-:~-~--~-~--~ ...... ~---[---F--~ .... :~-:--:---~.-:F7 .... F-}~-~-,-~-~:.-~:}:--}.~-h.-~-.-:,~--~ ...... :-.-:-~ ::'
: ~ : ~.~ ~..; ...... ~..~...~..; ~.: : :.: .;.; ~.~ .... ~.: ~.~ ;.~ ~..; .~ ; : ~ ;.;.;.~ .... :.: ; ; ..~..: : : ........ ; :.~ ..' · .
.. . :::: : ....
:;..:..,..,.,...,.., ..... ~ ..... .... ....... ~ ..... ..... ......,
:';'; ';': ; ;'";::' ...... ..... ~ '1=-=~';'';~';e~ ~: ;;'" ...... ' .... ~ ............ ' ..... ;; ...... ;;' ' ~ '
: ~ ~' ~ ......
120(X)
PROJECTION ON VERTICAL PL.AJ~IE 265.00 85.00 ~CALED IN VERTICAL DEPTH~ HORIZ ~AJ_E = I 2000 IN/FT
ARCO Alaska, Inc.
iisburne/Point McIntyre Enginem
Date:
Subject:
From:
To:
August 19, 1993
Transmittal #350
ARCO Alaska Inc.
Bob Crandall
AC)GCC
3001 Porcupine Drive
Anchorage, AK 99501
The following Point McIntyre data are enclosed.
"
This information is confidential and your
cooperation in maintaining confidentiality is appreciated.
Log
Well Title
1blue line, I sepia
Pl-Gl-'Perforating Record
Run #
1
Run Date
7/4/93
Company
Schlumberger
:P1-04 -Z-Densilog Compensated Neutron -GR
P1-04-Dual Laterolog, GR / SP ,k~$~'
P1-04~ Borehole Profile
P1-04-Sub-Sea Vertical Depth (Single Shot Data)
P1-04-Cement Bond Log e '~-
P1-04-'Cement Evaluation Log (CET)
~1-04-Gyro Continuous Survey (GCT)
I 5/22/93 Altas
I 5/22/93 Atlas
I 5/22/93 Atlas
I 5/22/93 Atlas
1 6/12/93 Schlumberger
1 6/12/93 Schlumberger
I 7/28/93 Schlumberger
P1-05- Segmented Bond Log, Gamma Ray -CCL
P1-05-, Cement Bond Log-CBT w/Jewelry
P1-05-' Cement Evaluation Log-CET w/Jewelry
P1-05-Gyro Continuous Survey-GCT
I 7/11/93
I 8/12/93
1 8/12/93
1 8/12/93
Atlas
Schlumberger
Schlumberger
Schlumberger
P1-13
Pl-13
P1-13
P1-13
P1-13
P1-13
'P1-13
-"Neutron Poro, Density Poro, GR -MD ,x-t%
--Neutron Poro, Density Poro, GR -TVD ~'~"
--Dual Prop Resis, GR -MD 2~
~,'Dual Prop Resis, GR -TVD 2~"
5-7 6/2-6/93
5-7 6/2-6/93
5-7 6/2-6/93
5-7 6/2-6/93
-Dens Poro, Neu Poro, Dual Prop Resis, GR-MD 5-72e$ 6/2-6/93
~'~Dens Poro, Neu Poro, Dual Prop Resis, GR-TVD 5-7 ;.~ 6/2-6/93
wBulk Density, Gamma Ray -MD ~" 5-7 6/2-6/93
BakerHughes
BakerHughes
BakerHughes
BakerHughes
BakerHughes
BakerHughes
BakerHughes
Pl-14-Engineering Parameters MD 2'~ ~
P1-14 - Pressure Data Log
Pl-14--Formation Evaluation MD ~." '~1~-.'~t,
Pl-14 -- Formation Evaluation TVD bz~--~t~8
- 2/26-3/6/93
- 2/26-3/6/93
- 2/26-3/6/93
- 2/26-3/6/93
Exlog
Exlog
BakerHughes
BakerHughes
PLEASE SIGN ONE COPY AND RETURN
Transmittal #350 (AOGCC)
Log (contd.)
Well Title
1 blue line, 1 sepia
Pl-16 -' Engineering Parameters MD
[Pl-16.~Pressure Data Log
~Pl-16~Formation Evaluation MD
~Pl-16,,-Formation Evaluation TVD
II
Run .#
P1-17-Bulk Density -Gamma Ray -MD ~'
Pl-!7---Dual Prop Resis -GR-MD 2t5"
P1-17/Dual Prop Resis-GR-TVD ~4'5 *
Pl-17--Dens Poro, Neutron Poro -GR -MD %.+~tt
P1-17-Dens Poro, Neutron Poro -GR -TVD ;.,'rS ~'
5,SRR
5,SRR
5,SRR
5,SRR
5,5RR
Pl-!7-'EPmsPoro, NeuPoro, DualProp, R~SsKlR-MD ::~" 5,SRR
IPl-17- ~_nsPoro, NeuPoro, DualProp, ResisKiR-WD 1+~" 5p-RR
Run Date
3 / 19-28 / 93
3/t9-28/93
3/19-28/93
3 / 19-28 / 93
4/1'4-16/93
4/14-16/93
4/14-16/93
4/14-16/93
4/14-16/93
4/14-t6/93
4/14-16/93
Page 2
Company
Exlog
E,-dog
BakerHughes
BakerHughes
Baker Hughes
Baker Hughes
Baker Hughes
Baker Hughes
Baker Hughes
Baker Hughes
Baker Hughes
Diskette/Tape (w/verification)
Wet1 Tide
Run #
\P1-04
q~--'~ P1-13
q ¥-,5% P1-16
Final MWD Survey b/61~_ -
DLL/CN/ZDL/GR in LDWG Format 1~-
Final MWD Survey bt~.~ -
Dual Prop Resis, Neutron, Density, GR'~ ~,¢/4~ o~4 6
5,SIqR
q%-6~ P1-17 Dual Prop Resis, Neu, Dens, GR -Depth Shifted
Run Date
3/24/93
5/22/93
6/11/93
3/29/93
4/16/93
Company
BakerHughes
Atlas
Sperry Sun
BakerHughes
BakerHughes
Please sign ___ and return to:
Transmittal #350
Laura S. Lahrson, ATO-409
ARCO Alaska, Inc.
P.O. BOX 100360
Anchorage, Alaska 99510-0360
PLEASE SIGN ONE COPY AND RETURN
MEMORANDUM
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
to:
David W. Johnst.~
Commissione]::;;~
thru:
Blair E Wondzell
Petr lnsp Supervisor
from: Jo n~Spaulding
Petr Inspector
date: July 15, 1993
file: 061893.doc
sub)ecl: BOP Test- Pool 7
ARCO Well P1,05
Point Mc!ntyre Unit
PTD 93-87
Friday, June 18, 1993: I traveled this date to Pool 7, ARCO Point Mclntyre Unit~to witness
a BOP test.
There were three leaks. A leak on the kill line was repaired with a new spool piece, a
leak on the choke line was repaired by replacing an APl ring, and a leak on the choke
valve was repaired by replacing the gates.
Summary: Witnessed BOP test on Pool 7; 3 failures, 12 hours.
attachments
STATE. OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
Ddg Contractor:.
Operator. /-/~-- ~ -
Well Name: ~/- ~ ~-
Casing Size: /~ -~/¢ ~ Set t~ ~/~Z G Feet
Test Initial Weekly ~ Other
Rig No.
DATE:
P'rD # R'
Rep. ~.~7-, ,4~ . ,~,~'~'~
Rep. Z-c~,-~' /~,~/C
~on:Sec. /~ T. /~R.
MISC. INEPECTION8: ~-. FLOOR ~ VALVE~: Quart. Pressure P/F
Location Gen.: / Well Sign ,,-"' Upper Kelly / I.~o/_~ ~ ~ I /'~
Housekeeping: ~/ (Gan) Dd. Rig ,,/ Lower Kelly /
Reserve Pit ,~//¢ Ball Type / I~-oo/~o
Test
BOP STACK: Gu~. Pressure P/~ CHOKE MANIFO~:
Ann. Preventer ~'/ No. Valves /~.
Pipe Rams No. Flanges
Brmd Rams Manuel Chokes
Chk/Ln Valves Hydraulic Chokes I..~a/,~..~
HCR Valves
ICdl Line Valves ? ACCUMULATOR SYSTEM:
Check Va, System Pressure ~,~ ~:~ I,/p
Pressure Alter Closure
I~UD SYSTEM: Light Nerm 200 psi Altained After Closure minutes
Trip Tank System Pressure Altained
Pit Level Indicators Blind Switch Covers: Master:
Flow Indicator '. Nltgn. BIJ's: ~ E,4, . '
Gas Detectors , . ~, ~/c) ~ Psig.
~~ ~'~::~!'!~'!'"~:::::::'?' ::'":"": :~:!~:~;~:.:::.::...:!:!.~:;..::~::.?!~..:~.::.:::::~..v..:~..~:.::::.:::!~!~...~...!:!:i.?:~:~:~::::::::::~.:F:~:~?!~!i~~ ~!!!!~'~:G~ ' ti,'.' r~'*'TIF"
Number of Failures .~ TestT'~e /~D__Houm Numberofwlveste~ed ~ RepeirorReplecamentofFeiled
Equipment ~hall be m~le within '~ 'del~. Notify the Ir-.,pector on duty end follow with Written or F~xed verification to
the AOGCC Commission Ofr~,e at: Fu No. 27~.7~42 In~peeter North Slope Pager No.
If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433
Distribution:
ofig-Well File
c - Oper./Rig
c - Database
c - Trip Rpt File
c - Inspector
STATE WlTN/.~ REQUIRED?
YES NO
24 HOUR NOTICE GIVEN
YES / .... NO
Waived By:.
Witn~ By:.
FI-021L.XLT Rev. 1/93
ALASKA OIL AND GAS
CONSERVATION COMMISSION
June 11, 1993
Michael Zanghi
Drilling Engineer Supervisor
ARCO Alaska, Inc.
P O Box 196612
Anchorage, AK 99519-6612
WALTER J. HICKEL, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
TELECOPY: (907) 276-7542
Re:
Prudhoe Bay Unit P1-05
ARCO Alaska, Inc.
Permit No: 93-87
Sur. Loc. 1458'NSL, 697'WEL, Sec. 16, T12N, R14E, UM
Btmhole Loc. 2245'NSL, 1780'WEL, Sec. 14, T12N, R14E, UM
Dear Mr. Zanghi:
Enclosed is the approved application for permit to drill the above
referenced well.
The permit to drill dOes not exempt you from obtaining additional
permits required by law from other governmental agencies, and does not
authorize conducting drilling operations until all other required
permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with
20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE
test performed before drilling below the surface casing shoe must be
given so that a representative of the Commission may witness the test.
Notice may be given by contacting the Commission petroleum field
inspector on the North Slope pager at 659-3607.
,
Sincerely,
Commis s ioner
BY ORDER OF THE COMMISSION
dlf/Enclosures
cc:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
printed on recycltd paper
STATE OF ALASKA
ALASKA t.,,- AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
2O AAC 25.OO5
Re-Entry [] Deepen1-1! Service [] Development Gas [] Single Zone [] Multiple Zone []
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
ARCO Alaska, Inc. KBE = 50' feet Point Mclntyre
3. Address 6. Property Designation
P, 0. Box 196612. Anchorage. Alaska 99519-6612 ADL 34624
4. Location of well at surface 7. Unit or properly Name 11. Type Bond(~,o 20 sc 2~.o~s)
1458' NSL, 697' WEL, SEC. 16, T12N, R14E Prudhoe Bay Unit
At top of productive interval 8. Well number Number
2173'NSL, 2456' WEL, SEC. 14, T12N, R14E P1-05 U-630610
At total depth 9. Approximate spud date Amount
2245'NSL, 1780' WEL, SEC. 14, T12N, R14E 6/13/93 $200,000.00
12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth(MDa,dTVD)
!property line
: ADL365548-3035' feet P1-O4-13'@650'MD feet 2560 13825'MD/9211'TVDfeet
16. To be completed for deviated wells 17. Anticipated pressure (s~, 20 AAC 25.0-~s
Kickoff depth ~oo' feet Maximum hole angle ~4 o Maximum sur~ac~ 3330 pslg At total depth (TVD) ~0¢'/4390
18. Casing program ~ Setting Depth
s~ze Specifications Top Bottom Qdantit¥ of cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
30" 20" 91.5# H-40 Weld 80' 41' 41' 121' 121' 280 cu ft Arcticset (approx.)
13-1/2" 10-3/4" 45.5# NT-80 BTC 4146' 41' 41' 4187' 3550' 2684 cu ft PF "E"/406 cu ft "G"
9-7/8" 7-5/8" 29.7# VTS95HS NSCC 12709' 41' 41' 12750' 8422'
9-7/8" 7-5/8" 29.7# 13CR80 NSOC 1075' 12750' 8422' 13825' 9211' 801 cu fl Class "G"
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing. Length Size Cemented Measured d, ept,~, %, ~; ~: True-"V.'ertical depth
Structural ,i,.~. ;.., 'i~.i'i, '- ~ ':';/ :"'-' i~ !
Conductor
Surface , i ;.-,~ .. /i
Intermediate ;~(;~"~ ' -"'
Production ~\~;,o;,~.~ L.:Jt ~¢,.: G~(; r'.,- .... ¢', ,-',~";~'~5
Liner -.
Perforation depth: measured
true vertical
20. Attachments 'Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[]
Drilling fluid program [] Time vs depth pict [] Refraction analysis r-I Seabed report[] 20 AAC 25.050 requirementsl-]
21. i hereby certify that the/~oregoing is true and correct to the best of my knowledge
Si,ned H, ~.~~--/' CommissionTitleDril/in~/En~lineerSuperviS°ruse Only Date '~ ¢¢;~
Permit Number IAPI number IApproval date ~.;,¢;~ See cover letter
~'-~-<~7 !50'~'2'¢- 'Y- 7'Z-'~?u¢ ! /t3'~// -" 7'~_~ for other requirements
Conditions of approval Samples required [] Yes ~[} No Mud T~g required []Yes J[ No
Hydrogen sulfide measures [] Yes ~ No Directional survey required .1~ Yes [] No
Required working pressure for BOPE []2M; 1-13M; 1~5M; I-]10M; 1-115M;
Other:
/
LIR~,NAL SIGNED BY by order of /
Approved by ~, - Commissioner me commission Date~
..,~SSELL A. DOUGLAb'~
Form 10-401 Rev. 12-1-85 Submit in triplicate
[Well Name: [P1-05
Well Plan Summary
Type of Well (producer or injector): I Producer
Surface Location:
Target Location:
Bottom Hole Location:
1458' FSL and 697' FEL Sec 16 T12N R14E
2173' FSL and 2456' FEL Sec 14 T12N R14E
2245' FSL and 1780' FEL Sec 14 T12N R14E
I AFE Number: 12C0025 I
I Estimated Start Date: 16/20/93
IMl): I ~3,825'1
I Well Design (conventional, slimhole, etc.):
I Rig: I Pool #7
I I Operating days to complete: 122
I TVO: 192~' I I~g: 150
[ slimhole /longstring
Formation Markers:
Formation Tops TVDss MD
West Sak 6700' 9635'
K-10 8186' 12546'
Stump Island absent absent
K-5/HRZ 8640' 12938'
Kuparuk 8668' 12986'
GOC n/a n/a
Miluveach 9073' 13675'
Casin~g/Tubin Program:
Wt/F
Hole Size- Csg/ - Wtf'Ft Grade Conn Length Top Btm
Tbg O.D.
20" 91.5 H-40 WELD 80' 41' 121'
13.5" 10.75" 45.5 NT-80 BTC 4146' 41' 4187'
9.875" 7.625" 29.7 NT95HS NSCC 12709' 41' 12750'
7.625" 29.7 13CR80 NSCC 1075' 12750' 13825'
n/a 4.5" 12.6g 13CR80 TDS 12809' 41' 12850'
Well Plan Summary
..-.JtJN '- 4 159:~
Alaska Oil & Gas Cons. Cornrnissior:
Anchorage
Page 1
Logging Prog
Open Hole Logs:
I Cased Hole Logs:
ram:
GR/Resistivity/Neutron/Density: Top of W. Sak to TD w/MWD
Gyro
Cement Bond
Mud Program:
Surface Mud Properties: I
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
8.7 300 40-60 30-60 60-80 9-10 15-25
to to to to to to to
9.5 100 20-40 15-20 20-30 9-10 15-25
Intermediate Mud Properties: I N/A
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
n/a
Production Mud Properties: I
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
9.5 35 15 5 10 9 5
to to to to to to to
10.0 45 20 15 20 10 10
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer
will be installed and is capable of handling maximum potential surface pressures.
Directional'
·
I goP: l ~00' ~m / zW
[ Maximum Hole Angle: 1 54
Close Approach Well: P1-04. PM 1, PM 8, PM 4
Well Plan Summary
Alaska_ Oil & Gas Oons. (:;om~-[~issio~'~
Page 2
.
,
,
,
,
,
.
,
,
P1-05/J7
Operations Summary
MIRU drilling rig.
Spud well and drill 13-1/2" hole to 4187' md/3550' tvd building angle to 54
degrees.
Set 10-3/4" casing and cement same. Test casing to 3000 psi for 30 minutes.
Nipple up BOPs and test same to 5000 psi.
Pick up 9-7/8" BHA and ddll 10' of new hole and perform leakoff test. Continue
drilling to 13825' md / 9211' tvd. Log with MWD.
Set 7 5/8" L-80 and chrome casing and cement same, displacing with seawater.
Test casing to 3500 psi for 30 minutes.
Run 4-1/2" chrome tubing completion and tree.
Displace tubing to diesel and freeze protect well with 2000' of diesel in annulus.
Release rig.
Run cased hole logs: cement bond log, gyro.
Sudace Casing Depth:
Surface Casing Size:
Surface Casing Weight:
Bit Diameter:
Excess Factor
Intermediate Casing Depth:
Intermediate Casing Size
Intermediate Casing Weight:
Proposed Top of Cement
Bit Diameter:
Excess Factor:
PI-05/J? Cement Volumes
Surface String
4187
10 3/4
45.5
13.5
2
LEAD (TYPE "E" PERMAFROST)
Yield 2.17
Density 1 2
#sacks 1237 (2684Cu. Ft.)
TAIL (CLASS G)
Yield 1.16
Density 15.8
# sacks 350 (406 Cu. Ft.)
TOP JOB (TYPE "C" PERMAFROST)
# sacks 250 (235 Cu. Ft.)
.94 cuft/sx 15.6 ppg
Production String
13825
7 5/8
29.7
11986
9 7/8
1.9
LEAD
Yield 1.98
Density 1 5
# sacks 0
# bbls 0
TAIL (CLASS G)
Yield 1.2
De nsity 15.8
# sacks 6 68
# bbls 1 43
( 0 Cu. Ft.)
(801 Cu. Ft.)
HORIZONTAL VIEW
SCALE 500 ft. / DIVISION. ..... .
SURVEY REF: WELLH-EAD
N -o5
----m- 7' 625 I]D,~ _
~-~ 10 r~
.750 OD, 8 4187 ND, 3550 TVD ~ mo ~o ~--
VERTICAL VIEW
SCALE 1000 ft. / DIVISION
TVD REF: RKO
VERTICAL SECTION REF: WELLHEAD
TIE 1N
TARGET, START OF BUILD 8 [.00 DEG/[O0 FT
·
TARGET, START OF BUILD 8 1.50 DEG/iO0 FT
TARGET, START OF BUILD @ 2.00 DEG/IO0 FT
END OF BUILD
1218
10.750 OD, ~ 4187 MD, 3550 TVD
1788 T-8
$
I3o.o7 deg. E~st Declination
CASING POINT DATA
OD MD Inc Azi TVD North East
10.750 in. 4187 54.03 85.35 3550 138 1700
7.625 ~n. 13825 54.03 85.35 9211 771 9475
CRITICAL POINT DATA
MD Inc
TIE [N 0 0.00
TARGET, START 500 0.00
OF BUILD ~
1,00 DEG/IO0 FI
TARGET, START [000 5.00
OF BUILD 8
1.50 DEG/iO0 FI
TARGET, START 1500 12.50
OF BUILD 8
2.00 DEG/iO0 FT
END DF BUILD 3577 54.03
10.75' CASING P~187 54.03
T-8 4289 54.03
WEST SAK 9635 54.03
K-10 ]2546 54,03
K-5 / HRZ ]2938 54.03
TARGET / ]2986 54.03
KALUB[K /
KUPARUK
HILUVEACH 13675 54.03
TOTAL DEPTH / 13885 54.03
7.625' CASING PT
0 O0
0 00
85 35
85 35
85 35
85 35
85 35
85 35
85 35
85 35
85 35
85.35
85.35
TVD North East
0 0 0
500 0 0
999 2 88
1493 8 97
3198 98 1208
3550 138 1700
3610 145 1783
6750 496 6095
8460 687 8444
8690 713 8760
8718 716 8798
9123 761 9354
9211 771 9475
BHL DATA J
TVD9211.10[
MD 13825.21I
VS 9506.76[
NorLh 771.02[
East 9475.441
Date PLotted
Created By
Checked By
Approved By
Date
6/4/93
6115
8472
8789
8887
9385
VEST SAK
I I I
0 1000 2000 3000
VERTICAL SECTION PLANE: 85.35'
9507
TOTAL DEPTH
7.625 DB, e 13825 HO, 9211 TV[
4000 5000 6000 7000 8000 9000 [ 0000
I-' 1 --U.D
P -O5WPP
T~,ovelling C ,der' - Leost Dis~once
ReFerence ~/ell - PI-O5WP2
TVD 0 - 9Pll Ct. Interval, 50 Ct,
All I}Pec±ions l~el ±o T~ue No~±h
06/03/1993 4:25
240°
i~Oo
PI-01/R47 PI-01/R'47
PI - (~/Pt'O P 1-0~'/PI. FJ
PI-~ PI-~
' ~1~
PI-~ PI-~
~ Pl-07~ PI-~
PI-~ PI-~
PI-~I PI-~
PI-II~ PI-Il
PI-I~II PI'I~II
11~ PI-I~
1-14~ PI-Il
1-1~ PI-16
1-17~ PI-17
Pl-17m PI-17
PI-~ PI-~
Pl-~lq PI-~I
PI-~I~ PI-~I8
Pl-Ol~ PI-Gl
P~-~ P~
P2-12
~-~
p~-
P2-~ P~
~:~t P~
P ~
P~31~ P~31
~-~1 P~4~
~ ~ P~
l ~4~ P2-48
PS-4~T P2-IQ
Pg-~T P~
P~-5~T P2-51
P2-~T P2-~
P2-~IO P2-~lO
P~ P~
P2-~ P~
P2-~13 P2-~13
P~OI~I P2-DI
O.D~ST POJNgS
CRITICAL POINT DATA
MD ]nc Az{ TV]] Nc~(h Eos~
T]E IN 0 O.CO 0.00 0 0 0
TAI~uEI, START 500 0.00 0.00 500 0 0
CF ]AJILD R
1.00 DCG/{O0 rT
TAR'E~ 1, START iCO0 5.00 85.35 999 2 22
ElF BUILD P
1.50 DEG/{O0 FT
TARGE1, START ~00 12.50 B~.~ 1493 B 97
EF ]3UILD ~
~.00 DEG/{O0 FT
END ElF BUILD 3577 54.03 8~.35 319~ g8 ~08
10.7~' CASING PT 4187 54.03 E~.3~ 3~50 {~3 1700
T-8 4L~sg ~4.03 85.3~5 3GlO ~4~ ~783
W'EST SAK c)635 54.03 8~.35 6750 4c)6 6095
K- i 0 I ~--~46 ~4.03 8~.35 8460 687 8444
K-5 / H~Z l~g38 54.03 E~.3~ E~90 7~3 8760
TARGC1 / {~gSB 54.03 85.33 871B 7{6 87c)8
KALUBIK /
KUPA~LK
N]LUVEACH { 3675 54.03 85.3~ gl ~3 76i 9354
TOT/N_ [}EPTH / {3EL-~ 54.03 E~.3~ g~ii 771 c)475
7.6L:~' CAS]NO PT
CHOKE WING
HCR
~VANUAL
~cE'VO¥ 4. 1/~'-~0
TYPE E GATE VALVE
5/~'- 1 o, oooPs[
HUB X FLANGE
ADAPTOR
':h
HYDRIL 15
GK ANNULAR BOP LATCHED HEAD
15 5/8"-10,O00PSi HUB BOTTOM
CONNECT/ON
HYDRIL I3 5/8'- I O, O00PSI
MPL RA~ BOP HUB CONNECTIONS
4 1/16'-10,000PSl SIOE OUTLETS
H~DRIL ~,3 5/8'- I O, O00PSi
/~PL RAM BOP HUB CONNECTIONS
~ 1/16"-I0,000P3I SIDE OUTLETS
t~NUAL
HCR
LYNN INTERNATIONAL
3 ~/~ ~"-~o,ooo?s/
CHECK VALVE
KILL WING
BcEVO¥ $ 1/16"- 10, O00PSI
TYPE E GATE VALVE
HYDRIL 13 5/8'- 10, O00PSI
MPL ~ BOP HUB CONNECTIONS
4 1/16"-10,000PSI SIDE OUTLETS
BLOW-OUT PREVENTER
PM RIG 7
· -'RUDHOE BAY DRILLING GROUP
20" DIVERTER SCHEMATIC
POOL 7
FILL UP LINE
FLOWLINE
I I
20" 2000 PSI
DIVERTER
'10" BALL VALVE 10" BALL VALVE
CONDUCTOR
NOTE:
ONLY ONE VALVE OPENS AUTOMATICALLY WHEN THE DIVERTER CLOSES.
THE SECOND VALVE WILL REMAIN CLOSED UNLESS CONDITIONS REQUIRE
THE USE OF THE SECOND DIVERTER LINE. THE SECOND' VENT LINE CAN BE
REMOTELY OPENED TO ACHIEVE DOWNWIND DIVERSION.
THIS IS A VARIANCE FROM 20AAC25.035.
Oil °
~ Gas Cons. Commission
;Anchorage
¢ nnrT~nnnnnnnnnnnnnl,
! r~nnn
~-.:m: ..-.:,,-.:m: ................................................
im
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
3001 Porcupine Drive
Anchorage Alaska 99'301-3192
Re:
THE APPLICATION OF ARCO )
ALASKA, INC. for an order granting )
an exception to spacing requirements of )
Title 20 AAC 25.055 to provide for the )
drilling of the ARCO Pt. Mclntyre P 1-05 )
development oil well. )
Conservation Order No. 316
ARCO Alaska Inc~ '
Pt. McIntyre P 1-05
Development Oil Well
May 25, 1993 ·
IT APPEARING THAT:
o
ARCO Alaska, Inc. submitted an application dated May 6, 1993 requesting ·
exception to 20 AAC 25.055(a)(3) to allow drilling the ARCO Pt. McIntyre P1-05
development oil well closer than :500 feet to a drilling unit boundary.
.
.
Notice of hearing was published in the Anchorage Daily News on May 10, 1993
pursuant to 20 AAC 25.540. '
No protests to the application were received.
FINDINGS:
,.
1. The ARCO Pt. Mclntyre P 1-05 well as proposed will be directionally drilled from
a surface location 1458' from the south line (FSL) and 697' from the east line
(FEL) of Section 16, T12N, R14E, Umiat Meridian (UM). The proposed target
location is 2173' FSL and 2456' FEL of Section 14, T12N, R14E, UM and the
proposed bottom-hole location is 2225' FSL and 1821' FEL of Section 14, T12N,
R14E, UM.
.
Offset owners BP Exploration (Alaska) Inc. and Exxon Corporation have been
duly notified.
4. An exception to 20 AAC 25.055(a)(3) is necessary to allow drilling of this well.
CONCLUSION:
Granting a spacing exception to allow drilling of the ARCO Pt. McIntyre P 1-05 well as
proposed will not result in waste nor jeopardize correlative rights.
Conservation Orde~No. 316
May 25, 1993
Page 2
NOW, THEREFORE, IT IS ORDERED: . ~
:
ARCO Alaska, Inc.'s application for exception to 20 A_AC 25.055,for the purpose of
drilling the Pt. McIntyre P 1-05 well is approved as proposed.
·
DONE at Anchorage, Alaska and dated May 25, 1993.
ssion
·
Russell A. Douglass, Conm~sioner
Alaska Oil and Gas Conservation Commission
P1-05CMT.XLS
State: Abd~,~ Engineer.
Well: P1-05 Work Sheet:
Field: PT. MCINTYRE Date:
State Permit 1~ 93-87
£emen! Vo&,me
Casing Type
Casing Size
Casing Length
Hole DiameIe~
Cement- Sacks
Cement- Yield
Cement- Cubic It
Cement- Cubic It
Cement- Sacks
Cement- Yield
Cement- Cubic ft
Cement- Cubic ti
Cement- Sacks
-Inches
- Feet
-Inches
111
111
111
111
112
112
112
112
113
Cement- Yield 113
Cement- Cubic ft 113
Cement- Cubic It 113
Cement- Cubic tt ! Vol
Cement- Fill Factor
Conductor Su~tace
20.000 10.750
80.000 4,146000
28.000 13.500
0.000 0. t300
0.000 0.000
0.000 0.000
280.000 2,684.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 406.000
0.000
0.000
0.000
0.000
280.000 3,090.000
2.325 2.049
Liner
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
~DIV/O!
Casing Type
Casing Size -Inches
Casing DeCh -Feet
Hole Diamete~ -Inches
Cement- Sacks 111
Cement- Yield 111
Cement- Cubic It 111
Cemer~ - Cubic ft 111
Cement-Sacks11112
Cement- Yield 111:I2
Cement- Cubic tt ~2
Cement- Cubic ft 112
Cement-Sacks113
Cement- Yield 113
Cement- Cubic it 113
Cement- Cubic It 113
Cement-Cubic it /Vol
Cement-Ir~elval tt
Top ol: Cement- Feet
Intermediate 111 Intermediate 112
0.000 0.000
0.O00 0.000
0.000 0.000
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
tIDIV/O!. 11DIV/0!.
11:DIV/0! ttDIV/0!
Production
7.625
13,825.000
9.875
0.00
0.00
0.00
801.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
801.00
3,729.86
10,095.1 Measured Depth
State: Alaska
Borough:
Well: P1-05
Field: PT. MCINTY'RE
St. Perm # 93-87
P1-05CSG.XL$
Date 6/8/93
Engr: M. Minder
Casing Interval Interval
Size Bottom
Top Length
lA 10.75 3550 41 4146
2A 7.625 8422 41 12709
SA 7.625 9211 8422 1075
4A 0 0 0 0
5A 0 0 0 0
6A 0 0 0 0
7A 0 0 0 0
8A 0 0 0 0
9A 0 0 0 0
10A 0 0 0 0
Description Description Description Tension
Lbs Grade Thread Lbs
45.5 NT-80 BTC 0
29.7 NT95HS NSCC 0
29.7 13CR80 NSCC 31927
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
Mud Hydraulic Collapse
L'Vieght Gradient Gradient
ppg psi/ft psi/ft
1B 9.5 0.494 0.394
2B 10.0 0.520 0.420
3B 10.0 0.520 0.420
4B 0.0 0.000 -0.100
5B 0.0 0.000 -0.100
6B 0.0 0.000 -0.1 O0
719 0.0 0.000 -0.100
8B 0.0 0.000 -0.100
9B 0.0 0.000 -0.100
1 OB 0.0 0.000 -0.100
Maximum Minimum
Pressure Yield
psi psi BDF
3330 3580 1.1
3330 8180 2.5
3330 6890 2.1
0 0 #DIV/O!
0 0 #DIViO~
0 0 #DIV/O!
0 0 #DIV/O!
0 0 #DIV/O!
0 0 #DIV/O!
0 0 #DIV/O!
Tension Strength
K/Lbs K/Lbs
lC 188.64:3 715
2C 409.3843 811
3C 31.9275 683
4C 0
5C 0
6C 0
7C 0
8C 0
9C 0
10C 0
TDF
3.79
1.98
21 .~
#DIV/O!
#DN/O.!
#DIV/O!
#DIV/O!
#DIV/O!
#DN/0!
#DIV/0!
Collapse Collapse
Pr-Bot-Psi Resist. (2)F
1399 ;~090 1.494
3537 7200 2.035
3869 4790 1.238 ·
0 o #OlV/0!
0 0 #DIV/O!
0 0 #DIV/O!
0 0 #DIV'/O!
0 0 #DIV/O!
0 0 #DIV/O!
0 0 #DIV/O!
** CHECK LIST FOR NEW WELL PERMITS **
ITEM APPROVE DATE
(1) Fee
(2) Loc
'[2 thru 8]
[9 thru 13]
[10 & 13]
(4) Casg -~?-K'.~'~ ~ -~-
[14 thru 22]
·
2.
3.
4.
5.
6.
7.
8.
9.
10.
11,
12.
13.
14.
15.
16.
17.
18.
!.9.
20.
21.
22.
23.
24.
25.
26.
27.
28.
(5) BOPE ,.~.., ~, - -
[23 thru 28]
E29 thru 31]
29.
30.
31.
32.
33.
eng i neet i nc;:
MTM~ RAD
BEW dD~/r~
<~,..,~_~
geo 1 ogy'
DWJ
RPC/
rev 12/92
jo/6.011
Company
Lease & Well
YES NO
/~,,
Is permit fee attached ...............................................
Is well to be located in a defined pool ..............................
Is well located proper distance from property line ...................
Is well located 'proper distance from other wells .....................
Is sufficient undedicated acreage available in this pool .............
REMARKS
Is well to be deviated & is wellbore plat included ................... /~ .
Is operator the only affected party .................................. /~. ....
Can permit be approved before 15-day wait ............................ ./~ ....
Does operator have a bond in force ...................................
Is a conservation order needed ........................................
Is administrative approval needed ....................................
Is lease number appropriate .......................................... -~-
Does well have a unique name & n~nber ................................ ./~
Is conductor st r i ng provided ......................................... .
Will surface casing protect all zones reasonably expected
to serve as an underground source of drinking water ..................
Is enough cement used to circulate on conductor & surface ............
Will cement tie in surface & intermediate or production strings ......
Will cement cover all known productive horizons .....................
Will all casing give adequate safety in collapse, tension, and burst.
Is well to be kicked off from an existing wellbore ...................
Is old wellbore abandonment procedure included on 10-403 .............
Is adequate wellbore separation proposed .............................
Is a d iverter system required ........................................
Is drilling fluid program schematic & list of equipment adequate .....
Are necessary diagrams & descriptions of diverter & BOPE attached ....
Does BOPE have sufficient pressure rating -- test to ~~ psig .....
Does choke manifold comply w/API RP-53 (May 84) ......................
Is presence of H2S gas probable ......................................
FOR EXPLORATORY & STRATIGRAPHIC WELLS:
Are data presented on potential overpressure zones ...................
Are seismic analysis data presented on shallow gas zones .............
If offshore loc, are survey results of seabed conditions presented...
Name and phone nL~nber of contact to supply weekly progress data ......
Add i t i ona 1
requirements .............................................
Additional
INITIAL GEOL UNIT ON/OFF
POOL CLASS STATUS AREA .~ SHORE
UM
. ~IERIDIA~J' SM
Exp/Dev
E]~=J. TYP~: Redr i 1 I
Inj
Rev
remarks'
0
--t
-rz
u'~ --I
Z
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information, of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
ALASKA COMPUTING CENTER *
SCHLUMBERGER
COMPANY NAME · ARCO ALASKA INC.
WELL NAME · P1-05/J7 ST#1
FIELD NAME : POINT MCINTYRE
BOROUGH : NORTH SLOPE
STATE : ALASKA
API NUMBER : 50-029-22378-00
REFERENCE NO : 93306
RECEIVED
OCT 1 4 199.~
Alaska Oil & Gas C~,,
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
23-SEP-1993 14:30
**** REEL HEADER *~**
SERVICE NAME ·EDIT
DATE · 93/09/23
ORIGIN : FLIC
REEL NAME : 93306
CONTINUATION # :
PREVIOUS REEL :
COMMENT ' ARCO ALASKA, INC., PT MCINTYRE, P1-05/J7 ST#l, 50-029-22378-00
**** TAPE HEADER ****
SERVICE NAME ' EDIT
DATE · 93/09/23
ORIGIN : FLIC
TAPE NAME : 93306
CONTINUATION # : 1
PREVIOUS TAPE :
COMMENT ' ARCO ALASKA, INC., PT MCINTYRE, P1-05/J7 ST#l, 50-029-22378-00
TAPE HEADER
POINT MCINTYRE UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
BIT RUN 1
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
93306
JACKSON
1ST STRING
2ND STRING
P1-05/J7 ST#1
500292237800
ARCO ALASKA, INC.
SCHLUMBERGER WELL SERVICES
23-SEP-93
BIT RUN 2
BIT RUN 3
16
12N
1 4E
1458
697
50.00
50.00
9.00
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
9.875 10.375 4260.0
PAGE:
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
3RD STRING
PRODUCTION STRING
REMARKS:
23-SEP-1 993
FIELD ENGINEER'S REMARKS:
********** RUN 1 **********
BIT TO RES 16.24' BIT TO GR 26.66'
BIT TO NEU 88 43''
, BIT TO DEN 81.45'
WASHDOWN INTERVAL 12470' TO 13825'
DOWNHOLE SOFTWARE V4.0C.
NO MWD DATA WITH THIS LOGGING RUN.
$
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION ' 001C01
MAX REC SIZE · 10
FILE TYPE : LO
LAST FILE :
14:30
PAGE:
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MAD
Depth shifted and cl~pPCd curves;
DEPTH INOR M T 0.
5000
FILE SUMMARY
PMU TOOL CODE START DEPTH
all bit runs merged.
STOP DEPTH
MWD 12470.0 13825.0
$
BASELINE CURVE FOR SHIFTS: GR
CURVE SHIFT DATA (MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
BASELINE DEPTH MWD
88888.0 88887.0
13609.0 13608.0
13584.0 13583.5
13457.0 13456.5
13249.5 13248.0
13225.5 13224.0
13210.5 13208.0
13166.0 13164.0
13009.0 13006.0
12989.0 12985.0
12975.5 12971 .5
12947.5 12944.5
12921 .0 12917.0
12913.0 12909.5
12905.5 12899.5
LIS Tape ~erification Listing
Schlumberger Alaska Computing Center
23-SEP-1993 14:30
12861 .5
12791 .0
12671 .5
12658.5
100.0
$
MERGED DATA SOURCE
PMU TOOL CODE
12854.0
12782.5
12663.5
12650.5
92.0
BIT RUN NO. MERGE TOP
MERGE BASE
$
REMARKS:
THE DEPTH ADJUSTMENTS SHOWN ABOVE REFLECT MAD GR TO
WIRELINE CET/GR OF 12-AUG-93. ALL OTHER CURVES WERE
CARRIED WITH THE GR SHIFT. UNSHIFTED DATA IS IN FILE
#2. NO DRILLING DATA EXISTS WITH THIS LOGGING RUN.
$
LIS FORMAT DATA
PAGE:
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 56
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 18
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE
PROCESS
( HEX )
DEPT FT 00 000 00 0 1 1 1 4 68
RHOB MAD GJC3 00 000 00 0 1 1 1 4 68
DRHO MAD G/C3 00 000 00 0 1 1 1 4 68
0000000000
0000000000
0000000000
LIS T~De Verification Listing
Schlumberger Alaska Computing Center
23-SEP-1993 14:30
PAGE:
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE
PROCESS
( HEX )
PEF MAD BN/E 00 000 00 0 1 1 1 4 68
CALN MAD IN 00 000 00 0 1 1 1 4 68
NPHI MAD PU-S 00 000 00 0 1 1 1 4 68
RA MAD OHMM 00 000 00 0 1 1 1 4 68
RP MAD OHMM 00 000 00 0 1 1 1 4 68
DER MAD OHMM 00 000 00 0 1 1 1 4 68
ROP MAD FPHR 00 000 00 0 1 1 1 4 68
GR MAD GAPI 00 000 00 0 1 1 1 4 68
NCNT MAD CPS 00 000 00 0 1 1 1 4 68
FCNT MAD CPS 00 000 00 0 1 1 1 4 68
GRCH CET GAPI 00 000 00 0 1 1' 1 4 68
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
** DATA **
DEPT. 13824.000 RHOB.MAD -999.250 DRHO.MAD -999.250
CALN.MAD -999.250 NPHI.MAD -999.250 RA.MAD -999.250
DER.MAD -999.250 ROP.MAD 77.255 GR.MAD -999.250
FCNT.MAD -999.250 GRCH.CET -999.250
DEPT. 12371.500 RHOB.MAD -999.250' DRHO.MAD -999.250
CALN.MAD -999.250 NPHI.MAD -999.250 RA.MAD -999.250
DER.MAD -999.250 ROP.MAD -999.250 GR.MAD -999.250
FCNT.MAD 3.794 GRCH.CET -999.250
** END OF DATA **
PEF.MAD
RP.MAD
NCNT.MAD
PEF.MAD
RP.MAD
NCNT.MAD
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION ' 001C0}
DATE ' 93/09 23
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE
***w FILE HEADER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION · 00}C0}
DATE ' 93 09 23
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
23-SEP-1993 14:30
FILE HEADER
FILE NUMBER 2
RAW MAD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
CDR 1 2470 . 0 1 3825 . 0
CDN 1 2470 . 0 1 3825 . 0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE:
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT/:
BOTTOM LOG INTERVALj(FT)' '
BIT ROTATING SPEED (RPM)
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
09-JUL-93
FAST 2.3E
V4.0C
MEMORY
13825.0
12470.0
13825.0
TOOL NUMBER
CDR
CDN
$
RESISTIVITY
NEUTRON/DENSITY
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN)'
DRILLERS, CASING DEPTH[~T) ·
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/Q)'
MUD VISCOSITY (S)'
MUD PH:
MUD CHLORIDES ~PPM):
FLUID LOSS (~3):
RESISTIVITY (OHMM AT TEMPERATURE DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
RGS059
NDS049
9.875
4260.0
10.30
0.338
0.246
SANDSTONE
2.65
66.0
58.0
PAGE:
LIS_Thpe Verification Listing
Schlumberger Alaska Computing Center
23-SEP-1993 14:30
HOLE CORRECTION (IN):
TOOL STANDOFF IINI'
EWR FREQUENCY HZ
REMARKS:
9.875
1.7
FIELD ENGINEER'S REMARKS:
********** RUN 1 **********
BIT TO RES 16.24', BIT TO GR 26.66'
BIT TO NEU 88.43', BIT TO DEN 81.45'
WASHDOWN INTERVAL 12470' TO 13825'
DOWNHOLE SOFTWARE V4.0C.
NO DRILLING DATA WITH THIS LOGGING RUN.
$
LIS FORMAT DATA
PAGE:
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64LB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 56
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 18
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE
PROCESS
( HEX )
DEPT FT 00 000 00 0 2 1 1 4 68
RHOB LW1 G/C3 00 000 00 0 2 1 1 4 68
DPHI LW1 ~ 00 000 00 0 2 1 1 4 68
DRHO LW1 00 000 00 0 2 1 1 4 68
PEF LW1 00 000 00 0 2 1 1 4 68
DCAL LW1 IN 00 000 00 0 2 1 1 4 68
TNPH LW1 PU 00 000 00 0 2 1 1 4 68
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
LIS T~De 9erification Listing
Schlumberger Alaska Computing Center
23-SEP-1993 14:30
PAGE:
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE
PROCESS
( HEX )
ATR LW1 OHMM 00 000 00 0 2 1 1 4 68
PSR LW1 OHMM 00 000 00 0 2 1 1 4 68
DER LW1 O~MM 00 000 00 0 2' 1 1 4 68
ROPE LW1 F/HR 00 000 00 0 2 1 1 4 68
GR LW1 GAPI 00 000 00 0 2 1 1 4 68
HENA LW1 CPS 00 000 00 0 2 1 1 4 68
HEFA LW1 CPS 00 000 00 0 2 1 1 4 68
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
DATA
DEPT. 13825.000 RHOB.LWl -999.250 DPHI.LWl -999.250
PEF.'LW1 -999.250 DCAL.LW1 -999.250 TNPH.LWl -999.250
PSR.LW1 -999.250 DER.LWl -999.250 ROPE.LWl 77.255
HENA. LW1 -999.250 HEFA.LW1 -999.250
'DEPT; 12379.500 RHOB.LW1 -999.250 DPHI.LW1 -999.250
PEF.LW1 -999.250 DCAL.LW1 -999.250 TNPH.LWl -999.250
PSR.LW1 ~999.250 DER.LW1 -999.250 ROPE..LWl -999.250
HENA.LWl -999.250 HEFA.LW1 3.794
END OF DATA **
DRHO.LW1
ATR.LW1
GR.LW1
DRHO.LW1
ATR.LW1
GR.LW1
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION - 00lC01
DATE · 93 09 23
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NAME ' ED93~9/23
DATE -
ORIGIN : FLIC
TAPE NAME : 93306
CONTINUATION # : 1
PREVIOUS TAPE
COMMENT : ARCO ALASKA,
INC.,
PT MCINTYRE,
P1-05/J7
ST# 1 ,
50-029-22378-00
LIS T~pe ~erification Listing
Schlumberger Alaska Computing Center
23-SEP-1993 14'30
**** REEL TRAILER ****
· D T
SERVICE NAME E3~09/23
DATE ' 9
ORIGIN : FLIC
REEL NAME : 93306
CONTINUATION # :
PREVIOUS REEL :
COMMENT ' ARCO ALASKA, INC., PT MCINTYRE, P1-05/J7 ST#l, 50-029-22378-00
PAGE '
* ALASKA COMPUTING CENTER *
* SCHLUMBERGER *
,~~~~Y NAME .' ARCO ALASKA INC.
.~I~ME ' P1-05/J7
b NAME · POINT MCINTYRE
BOROUGH '.NORTH SLOPE
STATE ' ALASKA
API NUMBER · 50-029-22378-00
REFERENCE NO · 93298
RECEIVED
OCT 1 4 199~
Nas~ Oil & Gas C~ms. ~.emr~{s.s[o,~
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
**** REEL HEADER ****
SERVICE NAME ' ED~
DATE ' 93 9/22
ORIGIN : FLIC
REEL NAME : 93298
CONTINUATION # :
PREVIOUS REEL :
COMMENT : ARCO ALASKA,
INC.,
**** TAPE HEADER ****
SERVICE NAME · EDIT
DATE ' 93/09/22
ORIGIN : FLIC
TAPE NAME : 93298
CONTINUATION # : 1
PREVIOUS TAPE :
COMMENT : ARCO ALASKA,
TAPE HEADER
POINT MCINTYRE UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING~COMPANY:
TAPE CREATION DATE:
JOB DATA
INC. ,
BIT RUN 1
JOB NUMBER: 93298
LOGGING ENGINEER' JACKSON
OPERATOR WITNESS: HEIM
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
22-SEP-1993 16:22
PT MCINTYRE, P1-05/J7, 50-029-22378-00
PT MCINTYRE, P1-05/J7, 50-029-22378-00
P1-05/J7
500292237800
ARCO ALASKA, INC.
SCHLUMBERGER WELL SERVICES
22-SEP-93
BIT'RUN 2
93298
JACKSON
HEIM
16
12N
14E
1458
697.
50.00
50.00
0.00
BIT RUN 3
93298
JACKSON
HEIM
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING 9.875
2ND STRING
10.375
4260.0
PAGE:
LIS Tame Verification Listing
Schlumberger Alaska Computing Center
3RD STRING
PRODUCTION STRING
REMARKS:
22-SEP-1993 16:22
FIELD ENGINEER'S REMARKS:
********** RUN 1 **********
BIT TO RES 49.71' BIT TO GR 60 13'
BIT TO NEU 121.831 BIT TO DEN i15.20'
DRILLED INTERVAL 9948' TO 11081
********** RUN 2 **********
BIT TO RES 49.66' BIT TO GR 60.08'
BIT TO NEU 121.781 BIT TO DEN 1115.15'
DRILLED INTERVAL 1~081' TO 1155
********** RUN 3 **********
BIT TO RES 80 93' BIT TO GR 91 35'
BIT TO NEU 15~.691 BIT TO DEN ~46.56'
DRILLED INTERVAL 1~552' TO 11656
-?
DATA PRESENTED OVER RUN #3 IS REAL-TIME
DATA ONLY. DOWNHOLE SOFTWARE V4.0C.
$
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION ' 001C01
DATE ' 93/09/22
MAX REC SIZE ' 1024
FILE TYPE : LO
LAST FILE :
PAGE:
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and cl~ppCd curves; all bit runs merged.
DEPTH INCREMENT 0.
5000
FILE SUMMARY
PMU TOOL CODE START DEPTH STOP DEPTH
CDN 9489.0 11655.0
CDR 9489.0 11655.0
$
BASELINE CURVE FOR SHIFTS: GR
CURVE SHIFT DATA (MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
BASELINE DEPTH MWD
$
MERGED DATA SOURCE
PMU TOOL CODE
BIT RUN NO. MERGE TOP
MERGE BASE
MWD 1 9489.0 11033.0
LIS Tape Verification Listing
Schlumberger ,Alaska Computing Center
22-SEP-1993 16:22
MWD 2
MWD 3
$
REMARKS:
11033.0 11503.0
11 503 . 0 11 655 . 0
NO DEPTH ADJUSTMEI~TS WERE MADE ON THIS MWD DATA SET
AS PER JAMES DEAL/FLOYD BETTIS.
$
LIS FORMAT DATA
PAGE:
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1' 66 0
2 66 0
3 73 56
4 66 1
5 66
6 73
7 65
8 68 '0.5
9 65 FT'
11 66 18
12 68
13 66 0
14 65' FT
15 66 68
16 66 1
0 66 0
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB .NUMB SIZE REPR
ID ORDER # LOG TYPE CLASS-MOD NUMB SAMP ELEM CODE
PROCESS
( HEX )
DEPT FT 619007 00 000 00 0 1 1 1 4' 68
RHOB MWD GJC3 619007 00 000 00 0 1 1 1 4 68
DRHO MWD G/C3 619007 00 000 00 0 1 1 1 4 68
PEF MWD BN/E 619007 00 000, 00 0 1 1 1 4 68
CALN MWD IN 619007 00 000 00 0 1 1 1 4 68
NPHI MWD PU-S 619007 00 000 00 0 1 1 1 4 68
RA MWD OHMM 619007 00 000 00 0 1 1 1 4 68
RP MWD OHMM 619007 00 000 00 0 1 1 1 4 68
DER MWD OHMM 619007 00 000 00 0 1 1 1 4 68
ROP MWD FPHR 619007 00 000 00 0 1 1 1 4 68
GR MWD GAPI 619007 00 000 00 0 1 1 1 4 68
NCNT MWD CPS 619007 00 000 00 0 1 1 1 4 68
FCNT MWD CPS 619007 00 000 00 0 1 1 1 4 68
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
LIS Tape Verification Listing
Schlumberge,r,iAlaska Computing Center
22-SEP-1993 16:22
PAGE:
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
FET MWD HR 619007 00 000 00 0 1 1 1 4 68 0000000000
** DATA **
DEPT. 11655.000 RHOB.MWD -999.250 DRHO.MWD -999.250 PEF.MWD
CALN.MWD -999.250 NPHI.MWD -999.250 RA.MWD -999.250 RP.MWD
DER.MWD -999.250 ROP.MWD 48.700 GR.MWD -999.250 NCNT.MWD
FCNT.MWD -999.250 FET.MWD -999.250
DEPT. 9489.000 RHOB.MWD -999.250 DRHO.MWD -999.250 PEF.MWD
CALN.MWD -999.250 NPHI.MWD -999.250 RA.MWD -999.250 RP.MWD
DER.MWD -999.250 ROP.MWD -999.250 GR.MWD -999.250 NCNT.MWD
FCNT.MWD 5.880 FET.MWD -999.250
** END OF DATA **
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
**** FILE TRAILER ****
FILE NAME : EDIT ' .001
SERVICE : FLIC
VERSION ' 00 C0
DATE ' 93}09}22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER *'***
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION · 001~
DATE '93 ~122
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 2
RAW MWD
Curves and log header data for each bit
BIT RUN NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUMMARY
run in
separate
files.
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-SEP-1993 16:22
VENDOR TOOL CODE START DEPTH
STOP DEPTH
CDR 9489
CDN 9489
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE:
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL.(FT)'
BIT ROTATING SPEED (RpM)
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
11080.5
11080.5
27-JUN-93
FAST 2.3E
V4.0C
MEMORY
11552.0
9489.0
11552.0
TOOL NUMBER
CDR RESISTIVITY
CDN NEUTRON/DENSITY
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE '(IN)'
DRILLERS CASING DEPTH (~T)'
BOREHOLE'CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G)'
MUD VISCOSITY [S)'
MUD PH:
MUD CHLORIDES IPPM):
FLUID LOSS (~3):
RESISTIVITY (0HMM AT TEMPERATURE DE'GF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX.CIRCULATING TEMPERATURE:'
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
TOOL STANDOFF /IN
EWR FREQUENCY HZ
REMARKS
(IN):
FIELD ENGINEER'S REMARKS:
****~***** RUN 1 ****~*****
BIT TO RES 49.71', BIT TO GR 60.13'
RGS042
NDS018
9.875
4260.0
9.60
0.291
0.235
SANDSTONE
2.65
9.875
1.7
75.0
75.0
PAGE:
LIS TaHe Verification Listing
Schlumberger Alaska Computing Center
22-SEP-1993
LIS FORMAT DATA
BIT TO NEU 121.83' BIT TO DEN ~15.20'
DRILLED INTERVAL 9~48' TO 11081
$
16:22
PAGE:
** DATA FORMAT SPECIFICATION RECORD **
SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 64
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 16
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE
PROCESS
( HEX )
DEPT FT 619007 00 000 00 0 2 1 1 4 68
RHOB LW1 G/C3 619007 00 000 00 0' 2 1 1 4 68
DPHIL 00 000 00
DRHO LW1 619007 00 000 00 0 2 1 1 4 68
PEF ' LW1 619007 00 000 00 0 2 1 1 4 68 '
DCAL LW1 IN 619007 00 000 00 0 2 1 1 4 68
TNPH LW1 PU 619007 00 000 00 0' 2 1 1 4 68
ATR LW1 OHMM 619007 00 000 00 0 2 1 1 4 68
PSR LW1 OHMM 619007 00 000 00 0 2 1 1 4 68
DER LW1 O~MM 619007 00 000 00 0 2 1 1 4 68
ROPE LW1 F/HR 619007 00 000 00 0 2 1 1 4 68
GR LW1 GAPI 619007 00 000 00 0 2 1 1 4 68
HENA LW1 CPS 619007 00 000 00 0 2 1 1 4 68
HEFA LW1 CPS 619007 00 000 00 0 2 1 1 4 68
TAB LW1 HR 619007 00 000 00 0 2 1 1 4 68
TABD LW1 HR 61 9007 00 000 00 0 2 1 1 4 68
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
,q£ ' ~
£ 6-MQ£- £ ~
O'~gLL
O'neiLL
:NOIS~ZA ZH~L~OS
~L~ ~Z~ZH 902
0 ' ~§60 L
0 ' ~§60 L
HLdZ~ ~OLS
oq~edos uT un~ qIq qo~o =o~
000§'0 :LMZNZ~DMI HLdZQ
~Z~ZH ZqI~
0% : Z~XL Z%I~
60/£6,'
0DL00 : NOIS~ZA
DI%~ : ZDIA~ZS
£00' ~I~Z : ZN~ Z~I~
O§Z'666-
O§Z'666-
O§Z'666-
0§Z'666-
LA~'M&~
LA~'OHMG
OSZ'666-
6L£'££
0§Z'666-
0S~'666-
L~q'~& O§Z'666-
L~q'Z~OM O§Z'666-
LMq'HAMZ OSZ'666-
LMq'IHdG 0§~'666-
L~I ' tf~ZH OS~ ' 666- Lt~I ' tfMZH
L~I'MZd 0§[ '666-
Lt~q' TdDCI 0 §~ ' 666-
L tvYI ' i~OI-IM O0§'090LL ',T,dZG
£66 L-~ZS-ZE
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-SEP-1993 16:22
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT/:
BOTTOM LOG INTERVAL.(FT)-
BIT ROTATING SPEED (RPM)
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
V4.0C
MEMORY
11552.0
9489.0
1'1552.0
TOOL NUMBER
CDR
CDN
$
RESISTIVITY
NEUTRON/DENSITY
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN]'
DRILLERS CASING DEPTHI~T)'
RGS042
,NDS018
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G)'
MUD VISCOSITY (S)'
MUD PH:
MUD CHLORID$S (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM AT TEMPERATURE DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
9.875
4260.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
9.60
0.291
0.235
REMARKS:
(IN):
SANDSTONE
2.65
9.875
TOOL STANDOFF /IN/-
EWR FREQUENCY HZ
1.7
FIELD ENGINEER'S REMARKS:
********** RUN 2 **********
BIT TO RES 49.66' BIT TO GR 60 08'
BIT TO NEU 121.781 BIT TO DEN !!15'15'
DRILLED INTERVAL 11081' TO 1155
# $
LIS FORMAT DATA
75.0
75.0
PAGE:
LIS TaDe Verification Listing
Schlumberger Alaska Computing Center
22-SEP-1993
DATA FORMAT SPECIFICATION RECORD
SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 64
4 66 1
5 66
6 73
7 65
8 68 0,5
9 65 FT
11 66 16
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
16:22
PAGE:
SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE
PROCESS
( HEX )
RHoBDEPT LW2 ~
C3~ 619007 00 000 00 0 3 1 1 4 68
619007 00 000 00 0 3 1 1 4 68
DPHI LW2 ~ 619007 00 000 00 0 3 ,1 1 4 68
DRHO LW2 619007 00 000 00 0 3 1 1 4 68
PEF LW2 619007 00 000 00 0 3 1 1 4 68
DCAL LW2 IN 619007 00 000 00 0 3 1 1 4 68
TNPH LW2 PU 619007 00 000 00 0 3 1 1 4 68
ATR LW2 OHMM 619007 00 000 00 0 3 1 1 4 68
PSR LW2 OHMM 619007 00 000 00 0 3 1 1 4 68
DER LW2 O~MM 619007 00 000 00 0 3 1 1 '4 68
ROPE LW2 F/HR 619007 00 000 00 0 3 1 1 4 68
GR LW2 GAPI.619007 00 000 00 0' 3 1 1 4 68
HENA LW2 CPS 619007 00 000 00 0 3 1 1 4 68
HEFA LW2 CPS 619007 00 000 00 0 3 1 1 4 68
TAB LW2 HR 619007 00 000 00 0 3 1 1 4 68
TABD LW2 HR 619007 . 00 000 00 0 3 1 1 4 68
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
DATA
DEPT, 11552.000 RHOB,LW2 -999,250 DPHI,LW2 -999,250 DRHO,LW2
PEF.LW2 -999,250 DCAL,LW2 -999.250 TNPH,LW2 -999,250 ATR,LW2
PSR,LW2 -999.250 DER,LW2 -999,250 ROPE,LW2 78,946 GR,LW2
HENA.LW2 -999,250 HEFA.LW2 -999,250 TAB,LW2 -999.250 TABD.LW2
-999,250
-999,250
-999.250
-999,250
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-SEP-1993 16:22
PAGE:
10
DEPT. 10952.000 RHOB.LW2
PEF.LW2 -999.250 'DCAL.LW2
PSR.LW2 -999.250 DER.LW2
HENA.LW2 -999.250 HEFA.LW2
** END OF DATA **
-999.250 DPHI.LW2
-999.250 TNPH.LW2
-999.250 ROPE.LW2
5.140 TAB.LW2
-999.250
-999.250
-999.25O
-999.250
DRHO.LW2
ATR.LW2
GR.LW2
TABD.LW2
-999.250
-999.250
-999.250
-999.250
**** FILE TRAILER ****
FILE'NAME : EDIT .003
SERVICE : FLIC
VERSION · 00}~
DATE '93 ~122
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION ' 001C01
DATE ' 93/09 22
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER 4
RAW MWD
Curves and log header data for each bit run in separate
BIT RUN NUMBER: 3
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
CDR '11552.0
CDN 11552.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE:
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
11655.0
11655.0
27-JUN-93
FAST 2.3E
V4.0C
MEMORY
11552.0
9489.0
files.
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
22-SEP-1993 16:22
BOTTOM LOG INTERVAL.(FT)-
BIT ROTATING SPEED (RPM)
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
11552.0
TOOL NUMBER
CDR
CDN
$
RESISTIVITY
NEUTRON/DENSITY
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN)'
DRILLERS CASING DEPTH[~T)'
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (ns/Q)'
MUD VISCOSITY (S)'
MUD PH:
MUD CHLORIDES {PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM AT TEMPERATURE DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD. AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
RGS042
NDS018
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
9.875
4260.0
REMARKS:
9.60
0.291
0.235
LIS
(IN):
SANDSTONE
2.65
9.875
TOOL STANDOFF /IN/'
EWR FREQUENCY HZ
1.7
FIELD ENGINEER'S REMARKS:
********** RUN 3 **********
BIT TO RES 80 93' BIT TO GR 91 35'
BIT TO NEU 152.69' BIT TO DEN 1~6.56'
DRILLED INTERVAL 14552' TO 11656
DATA PRESENTED OVER RUN #3 IS REAL-TIME
DATA ONLY. DOWNHOLE SOFTWARE V4.0C.
FORMAT DATA
75.0
75.0
PAGE:
11
LIS_Tape Verification Listing
Sch±umberg, er Alaska Computing Center
22-SEP-1993
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 64
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11' 66 16
12 68
13 66 0'
14 65 FT
15 66 68
16 66 1
0 66 1
16:22
PAGE:
12
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE
PROCESS
( HEX )
DEPT FT 619007 00 000 00 0 4 I 1 4
RHOB LW3 G/C3 619007 00 000 00 0 4 1 1 4
DPHI LW3 ~ 619007 O0 000 O0 0 4 1 1 4
DRHO LW3 619007 00 000 00 0 4 1 1 4
PEF LW3 619007 00 000 00 0 4 1 1 4
DCAL LW3 IN 619007 00 000 00 0 4 1 1 4
TNPH LW3 PU 619007 00 000 00 0 4 1 1 4
ATR LW3 OHMM 619007 00 000 00 0 4 1 1 4
PSR LW3 OHMM 619007 00 000 00 0 4 1 1 4
DER LW3 O~MM 619007 00 000 00 0 4 1 1 4
ROPE LW3 F/HR 619007 00 000 00 0 4 1 1 4
GR LW3 GAPI 619007 00 000 00 0 4 1 1 4
HENA LW3 CPS 619007 00 000 00 0 4 1 1 4
HEFA LW3 CPS 619007 00 000 00 0 4 1 1 4
TAB LW3 HR 619007 00 000 00 0 4 1 1 4
TABD LW3 HR 619007 00 000 00 ·0 4 1 1 4
68
68
.68
68
68
68
68
68
68
68
68
'68
68
68
68
68
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
0000000000
** DATA **
DEPT. 11655.000 RHOB.LW3 -999.250 DPHI.LW3
PEF.LW3 -999.250 DCAL.LW3 -999.250 TNPH.LW3
PSR.LW3 -999.250 DER.LW3 -999.250 ROPE.LW3
HENA.LW3 -999.250 HEFA.LW3 -999.250 TAB.LW3
-999.250
-999.250
48.700
-999.250
DRHO.LW3
ATR.LW3
GR.LW3
TABD.LW3
-999.250
-999.250
-999.250
-999.250
00-g££~-6~0-0§
O0-gL£~-6~O-O~
' LD/§O-Lc~
''DNI
' ' DNI
: %ZZH SgOIAZ~d
: #
g6~£6 : ZN~N
~I%~ : NIOI~O
101£6
·
E~'6~%dZ ' ZN~N Z3IA~ZS
: Zd~i SflOIAAHd
L : # NOIi~flNI&NOD
g6~£6 : ~N~
~/60/£6 '
LI~Z ' ZN~M ~DIAHZS
~[0t ' ZZIS O~
~160/£6 '
0Dr00 ' NOIS~A
DI~ : ZDIAHZS
~00' LI~Z : Z~N
0§['666-
O£S'[[t
O§L'[
0§['666-
0§~'666- £~7'S~L 0§~'666- £~'~ZH 0S['666- £~'~MZH
9~6'9£ £~'ZdO~ 0§~'666- £~'~Z~ 0§£'[ £~'~Sd
0§~'666- £~'H~NL 0§~'666- £~'~DG 0§~'666- £~'~Z~
0§~'666- £27'IH~G 0§['666- £~%'SOH~ O00'~§§LL '~dZG
£g
~a~uaD 6uYqndmoD eZseI~
, ,