Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout193-0877. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU P1-05 Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 193-087 50-029-22378-00-00 13828 Conductor Surface Intermediate Production Liner 9217 79 4196 13767 13200 20" 10-3/4" 7-5/8" 8862 41 - 120 40 - 4236 37 - 13804 41 - 120 40 - 3567 37 - 9203 470 2480 4790 1490 5210 6890 13056 - 13108 4-1/2" 12.6# 13cr80 8774 - 9074 Structural 4-1/2" Baker S3 , 12630 , 8513 12630 , 12812 8513 , 8621 Bo York Operations Manager Eric Dickerman Eric.Dickerman@hilcorp.com (907) 564-5258 PRUDHOE BAY, PT MCINTYRE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0034624 213 155 14498 11154 3922 3585 1802 1806 1628 1321 N/A 13b. Pools active after work:PT MCINTYRE OIL 4-1/2" Baker SABL-3 , 12812 , 8621 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations 35 - 12696 , 12790 - 12876 35 - 8552 , 8607 - 8660 No SSSV 13200 13561 By Grace Christianson at 10:25 am, Mar 28, 2024 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2024.03.27 16:45:06 - 08'00' Bo York (1248) DSR-4/12/24 RBDMS JSB 040424 WCB 7-1-2024 ACTIVITYDATE SUMMARY 10/30/2023 ***WELL S/I ON ARRIVAL*** RAN LIB TO TOP OF IBP @ 12875' SLM ( impression of ibp fishneck) RAN 3'' IBP EQ SLEEVE, 2-1/2'' RS TO 12875' SLM UNABLE TO EQ AND LATCH MADE 2 ATTEMPS TO EQ w/ 3" EQ SLEEVE, UNABLE TO EQ RAN 3.60 BELL GUIDE, 2.60 BELL GUIDE w/ TT PINS (cont on next day) ***WSR CONT ON 10/31*** 10/31/2023 ***WSR CONT FROM 10/30*** RAN 3.60 BELL GUIDE, 2.60 BELL GUIDE w/ TT PINS TP TOP OF IBP @ 12875' SLM, UNABLE TO EQ, TT PINS NOT SHEARED RAN KJ, 2' 1-7/8", 3.68'' CENT, 3.60 BELL GUIDE, 2.60 BELL GUIDE w/ TT PINS TO 12875' SLM (unsuccessful) RAN 3.65'' DE-CENT, 3.50'' LIB, S/D @ 12875'SLM (impression of ibp fishing neck) RAN 3-1/2'' GR, 3-1/2'' B-SUB, 2-1/2'' RS, S/D @ 12875'SLM (pulled ibp fish neck & rod) RAN KJ, SWIVEL, 3.65'' DE-CENT, 3.50'' LIB, S/D @ 12877'SLM (impression of doughnut next to parted ibp) RAN 3.5'' CENT, 3'x1-7/8'', 3.5'' CENT, 1-1/2'' POCKET BRUSH TO12879'SLM (attempted to pull doughnut, unsuccessful) RAN 3-1/2'' GR, 3-1/2'' B-SUB, 3.50'' CENT, 3'x1-7/8'', 3.50'' CENT, 2.70'' WFD RELEASABLE SPEAR (recovered doughnut) RAN 3-1/2'' GR, 3-1/2'' BAIT SUB, 2.25'' BDK RELEASEABLE OVERSHOT (1.00'' to 1.13'' grapples) (cont on next day) ***WSR CONT 11-01-23*** 10/31/2023 (Assist Slickline) TFS U-3, SB for SL ***Job Continued on 11-1-23*** 11/1/2023 ***WSR CONRT FROM 10-31-23*** RAN 3-1/2'' GR, 3-1/2'' BAIT SUB, 2.25'' BDK RELEASEABLE OVERSHOT (1.00'' to 1.13'' grapples), S/D @ 12876' SLM (multiple friction bites) RAN 3-1/2'' GR, 3-1/2'' BAIT SUB, 3.60'' BELL GUIDE, 2.60'' BELL GUIDE, 2'' JD (gutted) GRAB PARTED IBP @ 12785' SLM ( jar heavy for 10min, unsuccessful) RAN 3' x 1-7/8'' STEM, 3.67'' BLIND BOX, T-BIRD ON LINE TO LOAD WELL, GET P/U WEIGHT @ ~12620' SLM OF 1900# (dragging heavy thur scale, abort run) RAN 3'x1-7/8'', 3.50'' BLIND BOX TO @ 12870'SLM, JAR DOWN 1 HR w/ T-BIRD PUMPING & MAKE IT TO 12890'SLM T-BIRD COME PUMPED ~5 BPM FOR 20 BBLS TO SEE IF IT WILL PUSH IBP DOWN HOLE. PRESSURE NEVER CAME ABOVE 1000 PSI RAN 3' x 1-7/8" STEM, 3.50" BLIND BOX, TAG PARTED IBP @ 12886' SLM, T- BIRD PUMPED ~1 UP TO ~5 BPM WHILE BEATING DOWN FOR 120 BBLS TOTAL, NO MOVEMENT BRUSHED w/ 2' 1-7/8'' STEM, 3.80'' G-RING, 2' x 1-7/8'' STEM, 4-1/2'' BLB, B.NOSE X-NIP @ 12608' SLM / 12609' MD, CRIH TO 12632' SLM, UNABLE TO WORK PASSED ***WSR CONT ON 11-2-23*** Daily Report of Well Operations PBU P1-05 Daily Report of Well Operations PBU P1-05 11/1/2023 ***Job Continued from 10-31-23*** (Assist Slickline) TFS U-3, Pumped 2 bbls 60/40 and 454 bbls crude assisting SL. FWHP= 0/1050/0 SL still on well upon deqparture. 11/2/2023 ***WSR CONT FROM 11-1-23*** ATTEMPTED TO SET 3.813 X-LOCK (secdary lock down,lih 33'') NS IBP STOP @ 12609' MD (poss scale issues) SET 3.813 X-LOCK (secdary lock down,lih 33'') NS IBP STOP IN SSSV NIP @ 2301' MD RAN 4-1/2'' CHECK SET TO IBP STOP SET @ 2301' MD (sheared) ***JOB COMPLETE, WELL LEFT S/I*** 11/26/2023 ***ARRIVE ON AND INSPECT LOCATION WELL SHUT IN*** (fish ibp) DRIFT & PULL IBP STOP FROM 2,301' MD RAN MULT LIB. S/D @ 10,037' SLM. NO IMPRESSION ***CONT WSR ON 11/27/2023*** 11/27/2023 ***CONT WSR FROM 11/27/23*** (fish ibp) RAN LIB TAGGED IBP @ 12,943'SLM LATCHED IBP W/ OVERSHOT (ddk202) @ 12,943' SLM ***CONT WSR ON 11/28/23*** 11/28/2023 ***CONT WSR FROM 11/27/2023*** CUT WIRE BAD TEST 2,500' .125" CARBON SWAP TO .125" STAINLESS. RECOVERED & RESET OVERSHOT FISH (14'8" lih) @ 12,945' SLM. ***CONT WSR ON 11/29/23*** 11/29/2023 ***CONT WSR FROM 11/28/23*** JAR ON OVERSHOT IBP FISH @ 12,930' SLM RIGDOWN ***DEPART LOCATION*** 1/1/2024 ***WELL S/I IN ON ARRIVAL*** R/U POLLARD #61 PERFORMED MAN DOWN DRILL w/ CREW JOB CANCELED DUE BAD WEATHER POSSIBLY COMING ***WELL LEFT S/I IN ON DEPARTURE, DSO NOTIFIED OF WELL STATUS*** 1/8/2024 ***WELL S/I ON ARRIVAL*** RAN 4-1/2" GR TO IBP @ 12,975' SLM, BEAT 20 MINS, MOVE IBP UP TO 12,865' SLM (est. TTL) ***WSR CONT. ON 01-08-2024*** 1/8/2024 T/I/O= 1400/1100/0 Assist Slickline ( Load Tbg ) Pump 2 bbls 60/40 & 275 bbls crude down tbg to load. FWHPs=0/1200/0 1/9/2024 ***CONT. FROM 01-08-2024*** WORK IBP BETWEEN 12,836' SLM(xn-nip) TO 13,020' SLM, UNABLE TO WORK DEEPER ***CONT. ON 01-10-2024*** 1/10/2024 ***CONT. FROM 01-09-2024*** RAN 4-1/2" GR LEFT IBP IN TUBING TAIL @12,846'SLM ***WELL S/I ON DEPARTURE*** Daily Report of Well Operations PBU P1-05 2/27/2024 LRS CTU #2 1.75" CT 0.156" Wall - Job Scope: Fish IBP / Cement Squeeze MIRU CTU. RIH w/ Baker 4" G-Spear Fishing BHA. See no bobbles at Tbg Tail area. Continue RIH pushing IBP Fish. Tag at 13533'. (Previous Tag before IBP was set was at 13515' slm). Pick up and tag shallower at 12523'. Pump down Coil to release from SL bait sub if were latched up. Pooh. Bullhead 252 bbls 2% KCL w/ Safelube down backside. 0psi Whp with full water column. Break down fishing tools. RIH w/ HES 2-7/8" Logging Carrier & 3.60" Nozzle. Tag IBP fish at 13525' ctm. Log from compression up to 12500'. Flagged Pipe at 12465'. Pooh. Break down logging tools and confirm good data. +7' correction. Make up cementing BHA w/ 1.75" BDJSN and RIH. L&K well w/ 2% KCL down backside. ***In Progress*** 2/28/2024 LRS CTU #2 1.75" CT 0.156" Wall - Job Scope: Fish IBP / Cement Squeeze Continue RIH w/ 1.75" Cement Nozzle. Bullhead 235 bbls 2% KCL and 175 bbls Diesel to underbalance well. Reciprocate across lower perfs pumping 2% KCL down Coil. Pump 5 bbls FW, 16.5 bbls 15.8ppg Class G Cement, 5 bbls FW. Displace with Meth & Diesel. Park Coil at 13525' (~ 5' above IBP Fish, bottom of IBP Fish at ~ 13561'). Let 4 bbls Cmt around Coil. Lay in maintaining 1:1 returns. Once FW behind Cmt reached nozzle, close choke & pooh pumping pipe displacement (0.3bpm pulling 100fpm). TOC @ ~ 13200'. At surface, pump Gel Sweep thru Coil out to tanks. Freeze Protect Coil w/ Diesel. Tbg Freeze Protected w/ Diesel. Rig Down CTU. ***Job Complete*** 3/4/2024 ***WELL S/I ON ARRIVAL*** DRIFTED WITH 3.70" CENT, 3.00" SAMPLE BAILER DOWN TO 13,142' SLM(recovered ~1 cup of cement & coil shavings) ***WELL LEFT S/I ON DEPARTURE, DSO NOTIFIED OF WELL STATUS*** 3/19/2024 T/I/O = 1480/1500/0+. Temp = 112°. Bleed IAP to 500 psi (Eval TxIA comm). AL SI @ LV, no companion valve. OA cemented to surface. IA FL @ 4363' (Sta #4, SO). Bled IAP to OT to 490 psi in 35 min. IA FL unchanged. TP decreased 30 psi. Monitored for 30 min. IAP & IA FL unchanged. Final WHPs = 1450/490/0+. SV = C. WV, SSV, MV = O. IA, OA = OTG. 13:30 g Pump 5 bbls FW, 16.5 bbls 15.8ppg Class G Cement, 5 bbls FW. Displace g with Meth & Diesel. Park Coil at 13525' (~ 5' above IBP Fish, bottom of IBP Fish at ~( 13561'). Let 4 bbls Cmt around Coil. Lay in maintaining 1:1 returns. Once FW)yg behind Cmt reached nozzle, close choke &pooh pumping pipe displacement (0.3bpm pulling 100fpm). TOC @ ~ 13200'. gg Continue RIH pushing IBP Fish. Tag at 13533'. (Previous Tag before IBP was gg(g set was at 13515' slm). Pick up and tag shallower at 12523'. Pump down Coil to )g release from SL bait sub if were latched up. Pooh. Bullhead 252 bbls 2% KCL w/ Safelube down backside. 0psi Whp with full water column. Break down fishing tools. g RIH w/ HES 2-7/8" Logging Carrier & 3.60" Nozzle. Tag IBP fish at 13525' ctm. Loggg g gg from compression up to 12500'. Flagged Pipe at 12465'. Pooh. Break down logging tgg tools and confirm good data. +7' correction. Make up cementing BHA By Samantha Carlisle at 7:58 am, Aug 17, 2022 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071):10. Field/Pool(s): Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU P1-05 Pull IBP Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 193-087 50-029-22378-00-00 13828 Conductor Surface Intermediate Production Liner 9217 79 4196 13767 13725 20" 10-3/4" 7-5/8" 9160 41 - 120 40 - 4236 37 - 13804 41 - 120 40 - 3567 37 - 9203 None 470 2480 4790 None 1490 5210 6890 13056 - 13572 4-1/2" 12.6# 13cr80 8774 - 9074 Structural 4-1/2" Baker S3 Packer 12630, 8513 Bo York Sr. Area Operations Manager Kirsty Glasheen Kirsty.Glasheen@hilcorp.com 907.564.5258 PRUDHOE BAY, PT MCINTYRE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final 13.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0034624 4-1/2" Baker SABL-3 12812, 8621 N/A N/A 572 180 30447 8630 1349 5518 2117 1897 1989 1330 N/A STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2021 Submit Within 30 days or Operations Sr Res Eng: 12630, 12812 8513, 8621 35 - 12696, 12790 - 12876 35 - 8552, 8607 - 8660 By Samantha Carlisle at 9:15 am, Nov 09, 2021 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2021.11.09 07:11:58 -09'00' Bo York DSR-11/10/21 , ADL0028297 RBDMS HEW 11/10/2021 SFD 11/15/2021 SFD 11/15/2021MGR27DEC2021 ACTIVITY DATE SUMMARY 10/18/2021 ***WELL FLOWING ON ARRIVAL*** (profile modification) DRIFT TBG TO IBP @ 13247' MD w/ BOWSPRING CENT & 3.5" LIB (good pic of fn) PULLED 3-3/8 BAKER IBP @ 13247' MD FREE, JD SHEARED LEAVING IBP IN TBG @ 12630' SLM ***IN PROGRESS, JOB CONT. ON 10/19/21*** 10/19/2021 ***JOB CONT. FROM 10/18/21*** PULLED 3-3/8" BAKER IBP LEFT IN TBG @ 12360' SLM UNABLE TO GET IBP OUT OF 10' RISER, RISER TAKEN TO BAKER SHOP TO HAVE IBP EXTRACTED TO VERIFY ELEMENTS RECOVERED ***IN PROGRESS, JOB CONT. ON 10/20/21 IF NECCESSARY*** 10/20/2021 ***CONTINUED FROM 10/19/21 WSR*** (Profile modification) RAN MULTIPLE CONFIGURATIONS OF WIRE GRAB, BRUSH, & CENTS IN ATTEMPT TO FISH IBP ELEMENTS. DRIFT TUBING & TAG TD AT 13,533' SLM W/ 4-1/2" BRUSH, 3.50" WIRE GRAB (Scale on brush). ***WELL S/I ON DEPARTURE, NOTIFIED PAD OPERATOR OF WELL STATUS*** NOTE: TWO 6" SEALING ELEMENTS LEFT IN HOLE FROM BAKER IBP PULLED 10/19/21. Daily Report of Well Operations PBU P1-05 Date: 5/28/2020 Transmittal Number: 93762 BPXA WELL DATA TRANSMITTAL Subsurface Information Management 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 The digital zip file for the well log package listed below is being provided to you via SharePoint. If you have any questions please contact Merion Kendall: 907-564-5216; merion.kendall@bp.com. SW Name Log Date Company Description Format P1-05 4/20/2020 Schlumberger Production Profile Zip File Please Sign and Return one copy of this transmittal to GANCPDC@bp365.onmicrosoft.com Thank you, Mer Merion Kendall SIM Specialist ----------------------------------------------------------------------------------------------- BP Exploration Alaska|900 E. Benson Blvd.|Room: 716B|Anchorage, AK ----------------------------------------------------------------------------------------------- AOGCC https://bp365.sharepoint.com/sites/BPtoAOGCCElectronicPermittingandReporting/ PTD: 1930870 E-Set: 33269 Received by the AOGCC on 05/28/2020 Signed for by Abby Bell on 05/28/2020 • STATE OF ALASKA • RECEIVED ALASKA OIL AND GAS CONSERVATION COMMISSION AUG 2 4 2012 REPORT OF SUNDRY WELL, OPERATIONS 1. Operations Abandon 11 Repair Well u Plug Perforations t Perforate U AGQCCSet Plug Performed: Alter Casing ❑ Pull Tubing❑ Stimulate - Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat. Shutdown Stimulate - Other ❑ Re -enter Suspended WeIL 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: „" Name: BP Exploration (Alaska), Inc Development El Exploratory ❑ 193 -087 -0 3. Address: P.O. Box 196612 Stratigraphic❑ Service ❑ 6. API Number: P Anchorage, AK 99519 -6612 50- 029 - 22378 -00 -00 7. Property Designation (Lease Number): 8. Well Name and Number: ADL0034624 P1 -05 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s): _ None PRUDHOE BAY, PT MCINTYRE OIL 11. Present Well Condition Summary: Total Depth measured 13828 feet Plugs measured None feet true vertical 9218 feet Junk measured None feet Effective Depth measured 3528 feet Packer measured See Attachment feet true vertical 3138.84 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20" 91.5# H -40 39 - 119 39 - 119 1490 470 Surface 4198 10 -3/4" 45.5# NT -80 38 - 4236 38 - 3567.28 4560 1730 Intermediate None None None None None None Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner None None None None None None Perforation depth Measured depth 13056 - 13236 feet 13272 - 13572 feet True Vertical depth 8773.73 - 8883.16 feet 8904.38 - 9073.87 feet Tubing (size, grade, measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV (type, measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured): SCANNED LIAR 0 4 2013 Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 484 24797 5420 2081 1693 Subsequent to operation: 83 3834 4694 1876 1097 • 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development 0 ✓ Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil r 5 Gas ❑ WDSPLU GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUcf 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Garry Catron Prepared by Garry Catron 564 -4424 Printed Name Garry Catron Title PDC PE Signature f J C O:7 v Phone 564 -4424 Date 8/24/2012 R!DMS AUG 8 1012 v`' 1 ,�, / 17 Form 10 -404 Revised 10/2010 Submit Original Only • • Packers and SSV's Attachment ADL0034624 SW Name Type MD TVD Depscription P1 -05 PACKER 12664 8483.02 4 -1/2" Baker S -3 Perm Packer P1 -05 PACKER 12808 8568.66 4 -1/2" Baker SABL -3 Packer I Casing / Tubing Attachment ADL0034624 Casing Length Size MD TVD Burst Collapse CONDUCTOR 80 20" 91.5# H -40 39 - 119 39 - 119 1490 470 PRODUCTION 2698 7 -5/8" 29.7# L -80 37 - 2735 37 - 2599.66 6890 4790 PRODUCTION 2698 7 -5/8" 29.7# L -80 37 - 2735 37 - 2599.66 6890 4790 PRODUCTION 9765 7 -5/8" 29.7# L -80 2735 - 12500 2599.66 - 8435.28 6890 4790 PRODUCTION 1325 7 -5/8" 29.7# 13CR95 12500 - 13825 8435.28 - 9215.02 8180 5120 SURFACE 4198 10 -3/4" 45.5# NT -80 38 - 4236 38 - 3567.28 4560 1730 TUBING 12696 4 -1/2" 12.6# L -80 35 - 12731 35 - 8572.19 8430 7500 • TUBING 86 4 -1/2" 12.6# 13Cr80 12790 - 12876 8607.45 - 8660.18 8430 7500 • ! • Daily Report of Well Operations ADL0034624 ACTIVITYDATE SUMMARY ***WELL SHUT -IN ON ARRIVAL * ** (SLB E -LINE X -FLOW CHECK, THEN SET IBP) INITIAL T /I /O = 2050/2300/0 PSI RAN STP TO LOOK FOR CROSSFLOW AT IBP SET DEPTH. FOUND UP FLOW OF 1.2 BPM, NOTIFIED APE AND BAKER OF X -FLOW, BAKER PREPPING X- FLOW IBP FOR TOMORROW MORNING. TAGGED TD AT 13565' DEPTH CORRECTED TO WELL SKETCH ELM MEASURED TUBING TAIL OF 12886'. 6/20/2012 ** *CONTINUE JOB NEXT DAY * ** * ** JOB CONTINUED FROM 20- JUNE -2012 * ** (E -LINE: IBP) INITIAL T /I /O = 2300/2300/0 RIH WITH BAKER 3 -3/8" IBP. SET IBP MID - ELEMENT AT 13256'. CCL STOP DEPTH = 13230.7'. TOP OF PLUG = 13246.9' BAKER IBP: 1840# DOWN TO EQUALIZE. 5500# UP TO RELEASE. OVERALL PLUG LENGTH = 13.41'. 1.75" FISHING NECK. WELL SHUT IN ON DEPARTURE. FINAL T /I /O = 2300/2300/0 * ** JOB COMPLETE ON 21- JUNE -2012 * ** 6/21/2012 . ! TREE = FMC SAFETY NOTES: ***COMPOSITE WRAP REPAIRSH LEAK - WELLHEAD = FMC p 1 0 5 DO NOT MIT -OA OVER 1200 PSI DUE TO DESIGNED ACTUATOR = BAKER C PRESSURE RATING OF REPAIR & DO NOT PUMP METH 1 KB. ELEV = 50' METH BLEND INTO OA DUE TO CHEM! INCOMPATIBILITY BF. ELEV = 1 i wIEPDXY RESIN'"' 4- 112" CHRDM E TBG & 7 -5/8" KOP = 1332' 11 CHROMECSG. TBG HGR: FMC GEN BPX @ 35' MD. Max Angle = 57° @ 11729' 1 4 1 Datum MD = 13180' rei A I 2301' -- 1 4-1/2" HES HXO SSSV, 0 = 3.813" Datum TVD = 8800' SS 0 I 2711' H 7 -5/8" ES CEMENTER I 17 -5/8" CSG, 29.7 #, L -80, ID = 6.875" H 2736' I , W 3736' HEST TOP OF CEMENT (08/22/03) 14 1 10 -314" CSG, 45.5 #, NT -80, ID = 9.953' 1-{ 4236' 6 GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH FORT DATE 4 4363 3644 53 KBG -2 SO BK 24 07/23/09 _d 3 7466 5482 55 KBG -2 DMY BK 0 07/02/09 2 10041 7018 53 KBG -2 DMY BK 0 03/17/05 1 12582 8485 54 KBG -2 DMY BK 0 03/17/05 7 -5/8" CSG, 29.7 #, L -80, ID = 6.875" H 12499' J I I I 12609' 1-14-1/2" X NIP, ID = 3.813" Minimum ID = 3.725" @ 12856' 4 -1/2" PARKER SWN NIPPLE S g —. 1 2630' H7 -5/8" X 4 -1/2" BKR S -3 PKR, ID = 3.875" I I 12663' IH 4 - 1 /2" X NIP, 10= 3.813" I I I 12674' H 4 - 1/2" X NIP, ID = 3.813" I 12696' H 4 - 1/2" WLEG, ID = 3.958" I I4 -12" TBG, 12.6#, 13CR, .0152 bpf, ID = 3.958" —I 12696' I — 14-12" TUBING STUB ( 12/15/05) H 12790' ELM 12812' H 7 -5/8" X 4 -1 BKR SABL -3 PKR, ID = 3.88" I 12839' H 4 -12" PARKER SWS NIP, ID = 3.813" I 12856' I- 14 -12" PARKER SWN NIP, ID = 3.725" I 14 -1/2" TBG, 12.6 #, NT- 13CR -80, .0152 bpf, ID = 3.958" H 12876' r' 12876' -- 41/2' WLEG, ID = 4.0" 12886' H arvo TT LOGGED 08 /12193 I PERFORATION SUMMARY REF LOG: CDR ON 07/8/93 ANGLE AT TOP PERF: 51° @ 13056' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE \ 3-3/8" 6 13056 - 13236 0 09/02/93 \!� 3-3/8" 6 13272 - 13572 C 09/02/93 11 3247' ELMD — 13 -3/8" BKR IBP (0621/12) I PBTD I--I 13724' • • • 1 • • 1 • • • + • • * • • • • • • • • • • • • • • • 1 7 -5/8" CSG, 29.7 #, L- 80/13- CR -95, H 13804' 1,4 #1.1.1.1.... .0459 bpf , ID = 6.875" DATE REV BY COMMENTS DATE REV BY COMMENTS POINT MCINTYRE UNIT 07113/93 ORIGINAL COMPLETION 09/13/05 /TLH IBP PILLED (03 /17/05 -DRLG) WELL P1 -05 03/17/05 MRITLH RWO 09/29/09 DTR/SV GLV C/O (07/23/09) PERMIT No '1930870 08/11/01 RN/TP CORRECTIONS 10/27 /09 TTW /SV SAFETY NOTE API No 50- 029 - 22378 -00 01/18/04 JR/TLH OA DWNSQZ (08/22/03) 09/23/10 PJC SAFETY NOTE UPDATE SEC 16, T12N, R14E, 1759.29' FEL & 3036.49' FNL 06/07/05 WRR/TLH GLV C/O (03/24/05) 02/27/11 TQ/PJC SFTY NOTE (COMPOSITE WRAP) 06/18/05 JDM/PJC CORRECTION CHEM CUT 06/26/12 RWMIJMD SET IBP (06/21/12) 1 BP Exploration (Alaska) DATE: 23- Aug -12 Stephanie Pacific) TRANS#: 6044 Data Deflvery Services Technician OVIakana K Bender Schlumberger Oilfield Services , ` Natural Resources Technician It WIRELINE Alaska Oil & Gas Conservation CommissicU 2525 Gambell St, Ste. 400 SCANNED MAR 2 7 2013 323 VI. 7• Ave, Suite 100 Anchorage, T.Y 9 _ Anchorage, AK 99503 'N: Office: (907) 273 -1770 WELL SERVICE `: ? OH;•.. RESERV CNL' • MECH ' LOG DESCRIPTION DATE B/W • COLOR CDs ' NAME ORDER # DIST DIST • -- BIS• ._. DI-ST- -- - --. LOGGED PRINTS PRINTS G -258 BAUJ -00145 X MEMORY (PROF 25- Jul -12 1 1 CD • E -09C 6C00 -00024 X PPROF / IPROF MCNL 12- Jul -12 1 1 CD G -048 0600.00025 X MEMORY PPROF / IPROF MCNL 10- Jul -12 1 1 CD K -10C BAUJ -00138 X MEMORY PPROF W/ GHOST 29- Jun -12 1 1 CD V -202 0600.00031 X MEMORY LDL 22- Jul -12 1 1 CD 2 -06A _ CSXI.00016 X MEMORY PPROF 13- Jul -12 1 1 CD W -02A CSXI -00018 X MEMORY LEAK DETECTION 15- Jul -12 1 1 CD 14 -33A CSXI -00006 X MEMORY PPROF 13- Jun -12 1 1 CD 05 -23B BAUJ -00140 _ X MEMORY PPROF W/ GHOST 3- Jul -12 1 1 CD H -09 C2JC -00027 X IPROF 23- Jun -12 1 1 CD MPS -01B 8Z81-00021 IIIIIIIIIIIIEIIIIIIIIMIIMIMI PDC CORRELATION 9- Jul -12 1 1 CD MPS -01B 8281 -00021 - USIT 11- Jul -12 1 1 CD 05 -228 BCRC- 00 IIIIIIIIIMIIIII MEMORY PPROF 9- Jul -12 . P1-05 8 IIIINIIIMIIIIIOIIIIIIIIII _ XFLOW W/ IBP SET RECORD 20-Jun-12 1 CD 1 CD L1-09 BVYC- 00041 ONIIIIII PPROF 16- Jul -12 1 CD NM APBSURVE �� 19- Jul -12 � PPROF 1 1 CD • APBSURVEEL 1 CD 05 -228 BCRC -00196 X IIIIIIIIII _ MEMORY PPROF W/ GHOST 9- Jul -12 1 1 CD 18 -25A 11996389 X SCMT 13- Mar -08 1 1 CD G -258 BAUJ -00145 X MEMORY PPROF W/ GHOST 24- Jul -12 1 1 CD 2 -13A BAUJ -00142 X MEMORY LEAK DETECTION 7- Jul -12 1 1 CD X X / • �!:. ✓, /, .;;-r "--„� ._- k -- C %:-_; .: ti Please return a signed copy to: Please return a signed copy / to: BP PDC LR2-1 DCS 2525 Gam bell St, Suite 400 900 E Benson Blvd Anchorage AK 99503 Anchorage AK 99508 N 04 c, (A d J BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB-20 Post Office Box 196612 Anchorage, Alaska 99519-6612 January 1, 2010 Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPMA P1 Dear Mr. Maunder, Iq~~s Enclosed please find multiple copies of a spreadsheet with a list of wells from GPMA P1 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Anna Dube, at 659-5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Date 8/13/2009 Well Name PTD # API # Initial to of cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft na al P1-01 1900270 50029220180000 NA 0.2 NA 1.70 7/6/2009 P1-02A 2020650 50029217790100 NA 0.1 NA 0.90 7/8/2009 P1-03 1890130 50029219120000 Cemented to flutes NA 0 NA 0.00 P1-o4 1930630 50029223660000 NA 0.2 NA 1.70 7/8/2009 P1-05 1930870 50029223780000 NA 0.2 NA 1.70 7/18/2009 P1-06 1961370 50029226950000 Sealed conductor NA NA NA NA P1-07A 2040370 50029219960100 SC Leak NA NA NA NA P1-OSA 2021990 50029223840100 NA 1.2 NA 6.50 7/8/2009 P1-09 1961540 50029227040000 NA 14.5 NA 141.10 7/9/2009 P1-11 1920860 50029222840000 NA 0.2 NA 1.70 7/7/2009 P1-12 1910130 5oo2s2213aoooo NA 0.6 NA s.ao 7n/2oos P1-13 1930740 50029223720000 NA 1.5 NA 10.20 7/6/2009 P1-14 1930160 50029223380000 NA 1.5 NA 10.20 7/6/2009 P1-16 1930340 soo2s223asoooo NA 0.7 NA 6.80 7/6/2009 P1-17 1930510 50029223580000 NA 1.7 NA 11.90 7/7/2009 P1-18A 2020760 50029229530100 NA 1.8 NA 8.50 7/7/2009 P1-20 1920940 50029222880000 NA 0.6 NA 3.40 9/12/2009 P1-21 1930590 50029223630000 NA 0.6 NA 5.10 7/7/2009 P1-23 1961240 50029226900000 NA 1.6 NA 13.60 7/7/2009 P1-24 1961490 50029227030000 NA 10 NA 107.10 12/13/2009 P1-25 1890410 50029219370000 Sealed conductor NA NA NA NA P1-G1 1921130 50029222980000 NA 0.2 NA 1.70 7/6/2009 10/01/09 SchWierger N0.5405 Alaska Data Consulting Services Company: State of Alaska 2525 Gambol) Street, Suite 400 Alaska Oil Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job Log Description Date BL Color CD K -11 AY1M -00033 SBHP SURVEY j Ji[ fu 09/12/09 1 1 L4 -30 AWL8-00031 PRODUCTION PROFILE /t/ co r s� ,'j 08/06/09 1 t 1 P2 -31 AP3O -00045 LDL /9G /-Orj(0 /1" '9u 07/11/09 08/11/09 1 1 r 01 -29 ME-00009 PRODUCTION PROFILE 7f 1 1 J -22A 869K -00013 PRODUCTION PROFILE amp- 1 94 I� 08/30/09 1 1 W-44 8 Me.. 148.00071 INJECTION PROFILE t 09/06/09 1 1 12 -25 8 L 9 581 -00010 INJECTION PROFILE a(/ 08/22/09 1 1 L5 -33 AYKP -00051 SBHP SURVEY 9 11( b 09/01/09 1 1 P2-48 B69 -00015 SBHP SURVEY "1 0 09/01/09 1 1 Z -28 869K -00016 INJECTION PROFIL V ia4 /t-2.3/ 09/19/09 1 1 0.02A AP3O.00054 18P /LDL 1'4. 07/24/09 1 1 N -10A AXED -00040 MEM PROD PR ILE A a 0 8/2 5/09 1 1 W -24 AWJI -00044 MEM INJECTION PROFILE Off 0 �C/p8/15/09 1 1 V -03 82ND -00021 MEM PROD PROFILE aq ;!S Jg'} 09/03/09 1 1 H -14B 82WY -00026 MEM PROD PROFILE 08/27/09 1 1 P1 -01 AY1M -00031 1NJECT1ON PROFILE j 6 6 08/20/09 1 1 P1 -05 8581 -00009 PRODUCTION PROFIL .S 08/20/09 1 1 NK-10 B2WY -00023 MEM INJECTION PROFILE 11 08/22/09 1 1 13 -27A B2NJ -00019 MEMORY SCMT J' 08/13/09 1 1 18 -02B B2WY -00021 MEMORY SCMT a(� _.O 4 -4 -0'3 08/19/09 1 1 NK -38A AYKP -00049 USIT -Ai 3 1 08/17/09 1 1 06 -09 SWL8-00028 USIT. --05 07/30/09 1 1 13.03A 09AKA0150 OH O MWD /LWD EDIT ni 'f 07/06/09 2 1 C -18B B2NJ -00017 MCNL J Q I 4'�/ 08/09/09 1 1 1- 35/0 -25 B69K -00011 RST OO 08 /26/09 1 1 04 -35A AXED -00025 MCNL j CO 05113!09 l 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data 8 Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambol! Street, Suite 400 900 E. Benson Blvd. Anchorage. AK 99503 -2818 n, Scblum6erger Alaska Data & Consulting Services 2525 4ambe1l Slreel, Suite 400 Mchorage, AK 99503-2838 ATTN: 8elh Weu ~ NO. 5353 /`-yy~ Company: State o( Alaska .~~~ ~ O V `/ ~ Alaska Oil & Gas Cons Comm ~ ~ Attn: Christine Mahnken ~ 333 West 7th Ave, Suite 100 Anchorage,AK 99501 Job # Log Description Date BL Color CD 09/i t/09 ~~, . ~ ,. ~~ . ~ ~ ' t1 , ~ ~ V-02 W-26A H-32 82WY-D0018 B1JJ-00033 ANHY-00102 MEM PRODUCTION PROPILE ` MEM PRODUCTION PROFILE ~ PRODUCTION PROFILE ~ L- 07/27/09 07/2W09 07/25l09 1 1 1 ~ 1 1 P2-29 L2-11 L2-06 AYTU-00052 ANHV-00106 B69K•00007 INJECTION PROFILE "~ ~ 7_~ LDL ~ CROSS FL W CHECK - 08/0Y/09 08/OY/08 07/31/09 1 1 1 1 7 1 . P2-28 1-213 V-221 AYTU-00051 82WY-00019 AXBD-00037 INJECTION PROFILE C, -~ MEM INJECTION PROFI E' - MEM INJEC710N PROFILE' - 08/Ot/09 07/29/09 07/28/09 1 1 1 1 1 7 ~ L-220 07-22 04-02A 81JJ-00035 AZCM-00036 AYS4-00091 MEM INJECTION PpOFILE ~ PRODUCTION PROFILE - - USIT 07/30/09 08/09l09 08/11/09 1 1 7 1 1 1 J-11A Lt-09 X-28 AWLB-00029 AYS4-00088 AXBU00026 USIT - PRODU TION PROFILE "_Q~ MEM INJECTION PpOFILE U 08/05/09 08/08/09 05/17/09 1 1 1 1 1 1 12-06 3-29/J-32 06-04A B3SU-00020 AP3~-00055 B5JN-00009 PRODUCTION PROFILE IBP SET RECORD W/CHOSSGLOW ~ RST 08/14/09 08108/09 OB/23l09 1 1 1- 1 1 1 15-498 B2NJ-00013 MCNL - 07/15/09 1 1 03-328 09AKA0030 OH MWD/LWD EDIT 02/28/09 2 7 G-14B AWJI-00043 MCNL 07/24/09 1 1 L2-13A AWJI-00036 MCNL O6/17/09 ~ 18-028 AWJI-00045 MCNL - ~/ pg~p~09 ~ ~ Pt-05 AWLS-00032 RST 08/09/09 1 y B-16A B2WY-00020 MCNL '~ Q ` 08/03/09 1 ~ J-208 AXBD-00020 MCNL (REVISED) . ~ ;`L 04/12/09 ~ P~encF errtinwi cnr.G wcc cior wv cir_uiu r_ ~ur, o~r~ ~o.~..~., .,.~~ ........ ~....~ ~... BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Alaska Data & Consulting Services 2525 Gambell Streel, SuAe 400 Mchorage, AK 995034B3B °~ ~ ,,= t fi. 4„ :,,, ~.w. ~~ i ~~~~ 03/06/08 ~~~~~m~~~~~~ NO. 4621 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 ~ (x' 6 Alaska Oil & Gas Cons Comm Anchorage, AK 99503-2838 ~~~~ M~~ ~~ 10~~~ Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: P.Bay,Pt.Mac,Milne Pt,Orion,Lisburne Wcll .Inh !k Inn Descrintinn Date Bl_ Colnr CD C-41A 12021141 MEM LDL 02/25/08 1 1 MPS-01A 11970714 SCMT r} _ C 02/21/08 1 1 P1-O6 11975757 PROD PROFILE ~ ~ 03/02/08 1 1 Pi-05 11998992 PROD PROFILE 8' 02/29/08 1 1 Pi-06 11975757 SCMT (aj ~ 41' 03/02/08 1 1 09-23A 12045070 USIT gj - C ~ 03/02/08 1 1 L5-34 12057596 PROD PROFILE ~ 02/28/08 1 1 W-40 11970816 PRODUCTION LOG _j 03/04/08 1 1 15-04B 12005202 MCNL ~Q - i C 12/28/07 1 1 C-35B 12021139 MCNL ¢ 01/26/08 1 1 X-20A 11661178 CH EDIT PDC GR (MEM CORRELATION) _I 10/26/07 01~ 1 L-219 12017479 CH EDIT PDC GR (IBC) - [ /(p 01/02/08 1 F'LtASt AC:KNUWLtDCit Fit(:tll'I kfY S1faN1~1(a"i{IVIJ }StINFipIlNli`UNt I:UYY tAl:it IU: BP Exploration (Alaska) Ina • Petrotechnical Data Center LR2-1 900 E. Benson Blvd. , Anchorage, Alaska 99508 4 i ~ ~I'~, ~~~~~~~ Date Delivered: ~ )r., ~ ~ I,,,i~,,,;; Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Received by: • • l3 -~~. ~,~ STATE OF ALASKA ~ ~ ^~I '3~~0~LA~A OIL AND GAS CONSERVATION COMMON `N Y h f` ~ °~ ~ 2GOb ~~P~REPORT OF SUNDRY WELL OPERATI~I;~pil & Cas Ccx-s. Commissirx~ 1. Operations Abandon ~ Repair WeII ~ Plug Perforations ~ Stimulated O ~ERREAM/MILL OUT Performed: Alter Casing ~ Pull Tubing Perforate New Pool ~ Waiver Time Extension Change Approved Program ~ Operat. Shutdown ~ Perforate ~ Re-enter Suspended Well 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development Exploratory ~ 193-oa7o " 3. Address: P.O. Box 196612 Stratigraphic ~ Service 6. API Number: Anchorage, AK 99519-6612 50-029-22378-00-00 7. KB Elevation (ft): 9. Well Name and Number: 49.7 KB ~ P1-05 " 8. Property Designation: 10. Field/Pool(s): ADLO-034624 - PRUDHOE BAY Field/ PT MCINTYRE OIL Pool 11. Present Well Condition Summary: Total Depth measured 13828 r feet Plugs (measured) None true vertical 9216.69 - feet Junk (measured) None Effective Depth measured 13725 feet true vertical 9159.28 feet Casing Length Size MD TVD Burst Collapse Conductor 80' 20" Surface - 121' Surface - 121' 1490 470 Surface 4195' 10-3/4" 45.5# NT-80 Surface - 4236' Surface - 3567' 5210 2480 Production 13804' 7-5/8" 29.7# L-80 Surface - 13804' Surface - 9303' 6890 4790 ~~~~ ~iAR ~ ~ 20C Perforation depth: Measured depth: 13056 - 13236 13272 - 13572 = _ _ True Vertical depth: 8773.73 - 8883.16 8904.38 - 9073.87 _ _ Tubing: (size, grade, and measured depth) 4-1/2" 12.6# 13Cr80 35 -.1876 0 0 - Packers and SSSV (type and measured depth) 4-1/2" TRCF-4A SSV 2301 4-1/2" BakerSABL-9 Packer 12812 4-1/2" BKR S-3 PKR 12630 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: SHUT-IN Subsequent to operation: 42 12977 3935 1058 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run Exploratory ~ Development ~ Service ~' Daily Report of Well Operations X 16. Well Status after proposed work: Oil Gas ~' WAG GINJ WINJ ~ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Pr e Title Data Management Engineer Signature Phone 564-4944 Date 2/27/2008 Form 10-404 Revised 04/2006 S ~~~,_ ~A~ ~ '~ ~~~~ Submit Original Only • P1-05 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY ACTlVITYDATE ~ SUMMARY 2/22/2008 ***CTU 9 w/1./5" CT Job Scope: Mill/Underream Scale Tubing/Liner'** «InterAct not publishing» MIRU Knock WHP down and RIH w. 2 7/8" PDM w/ 3.7" Five Bladed Covex Junk Mill -tagged all nipples RIH -min motor work - exit tbg tail to 12920' CTM -POOH chase flopro pill to surface. RIH w. ','' undereamer 3.5" body 6.625" blades ...Continue job on 2/23/2008... 2/23/2008: ***CTU 9 Continue job from 2/22/2008**'` «InterAct not publishing» Exit ',tubing tail and start scale removal from liner using underreamer w/ 6.625" :blades 12880' CTM Saw heavy work around 13478' - 13482' CTM Caliper ';'report indicated restricted area at 13474' - no motor work 13482' - 13650' - ',Open circ sub - POH chasing flopro pill to surface. RDMO '`** Notify DSO to 'I leave well flowing **** Job complete *~~' FLUIDS PUMPED BBLS 1000 XS 1 % KCL 30 150 LSRV FLOPRO 58 60/40 METH 1058 TOTAL PWDW2-1 9189796 00 escriDtion Date BL Color CD LDL W-11 1089310S WFL 02107/03 1 G-1SA 106790SS 04/06/0S 1 SCMT P1..()S N/A 02/02/04 1 USIT C-3SA 11209S9S 03/07/0S 1 SCMT 03/27/06 1 RECE\VED Schlumberger OCT 0 4 L006 ~ C1l & Gas eons. eorom\sSicn An<;i'1Ofage Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job # L D Petrotechnlcal Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 8CANNf~.1 Nmf Q 2; 2005 '03-6~1 ~,_... '..:.- 09/19/06 NO. 3972 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99S01 Field: Prudhoe Bay . . Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth , STATE OF ALASKA ALASKJ.. )IL AND GAS CONSERVATION Ct. )t1ISSION RI=CF.:IVED REPORT OF SUNDRY WELL OPERATIONS" APR 1 g 2005 1. Operations Performed: o Abandon o Alter Casing o Change Approved Program II§ Repair Well 0 Plug Perforations 0 Stimulate o Pull Tubing 0 Perforate New Pool 0 Waiver o Operation Shutdown 0 Perforate 0 Re-Enter Suspended Well Alaska Oil III G,.I Cons. r.ommissic n ~_ge o Time Extension 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 49.7' 8. Property Designation: ADL 034624 11. Present well condition summary Total depth: measured Effective depth: true vertical measured true vertical 13828 9217 13725 9159 Casing Structural Conductor Surface Intermediate Production Liner Length 80' 4195' 13767' Perforation Depth MD (ft): Perforation Depth TVD (ft): 4. Current Well Class: 181 Development 0 Exploratory o Stratigraphic 0 Service 5. Permit To Drill Number: 193-087 6. API Number: 50-029-22378-00-00 99519-6612 9. Well Namø and Number: PBU P1-05 10. Field / Pool(s): Prudhoe Bay Field / Point Mcintyre Pool feet feet Plugs (measured) None feet Junk (measured) None feet Size MD TVD Burst Collapse 20/1 121' 121' 1490 470 10-3/4/1 4236' 3567' 5210 2480 7-5/8/1 13804' 9203' 6890 4790 SCANNE.D IJ¡PR 21 5 2.005 13056' - 13572' 8774' - 9074' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): 12. Stimulation or cement squeeze summary: Intervals treated (measured): 4-1/2/1, 12.6# 13Cr80 12876' 7-5/8/1 X 4-1/2/1 Baker 'SABL-3' packer; 7-5/8/1 x 4-1/2/1 Baker 'S-3' packer; 4-1/2/1 HES 'HXO' SSSV Nipple 12808' & 12630'; 2302' Treatment description including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Gas-Mcf Water-Bbl Casinq Pressure 8,641 14,602 8/26/04 6,126 150 04/11/05 15. Well Class after proposed work: o Exploratory II§ Development 0 Service 16. Well Status after proposed work: II§ Oil 0 Gas 0 WAG 0 GINJ 0 WINJ 0 WDSPL 17. I hereby certify that the foregoing Îs true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Paul Chan, 564-5254 N/A Oil-Bbl Prior to well operation: 1,488 Subsequent to operation: 390 14. Attachments: 0 Copies of Logs and Surveys run II§ Daily Report of Well Operations II§ Well Schematic Diagram Printed Name Terrie Hubble Signature ~~ q),1 ~ Form 10-404 Revised 04/2004 Tubinq Pressure Title Technical Assistant Pho~ Q k~4Þ481 /'\ I Date 04!Ia(O.C; RRJì1fl5 it¿ µSlv , ,'J L Prepared By Name/Number: Terrie Hubble, 564-4628 Submit Original Only ) ) PRE Raised and Secured Cellar Doors. Moved Rig off DS12-32 and Positioned in Center of Pad for Derrick Down. PRE PJSM- Prepared Derrick to LID. Removed Blocks from Top Drive. Bridled Up Blocks. Lowered Pipeshed Skate Chute. LID Derrick. PRE PJSM-Broke Down BOPE's. Removed Single Gate, Dbl. Gate and Annular from Cellar Area for Inspection & Reconfiguration. PRE PJSM-Installed Booster Wheels PRE PJSM-Moved Rig from DS12-32 to K-Pad/Pt. Mcintyre Intersection. PRE Moved Rig from K-Pad/Pt. Mac 1 Intersection to P1-05 Location PRE Spotted Rig on Location and Remove Booster Wheels PRE PJSM-Inspected Derrick, Raised Derrick, Raised Pipeshed Skate Chute PRE PJSM- Bridled Down Blocks & R I U Top Drive. R I U Drilll Floor. Assembled BOPE Stack. PRE Finished Sssembling BOPE Stack. Laid Herculite, Set Rig Mats. Lined Up Rig to Move Over Well. PRE Laid 3" X 6" Sills and Plywood Around Well Cellar. Staged Wellhead Equipment in Cellar Area. Modified Cellar Doors to Closed Around Wellheads. Accepted Rig @ 1800 hrs. 3-3-05 DECaMP Spotted Rig Over Well. Shimmed and Leveled Rig. Moved ESD Panels on Wells 4 & 6 to Facilitate Cellar Door Closure. Hung Arctic Curtains & Buttoned Up Cellar. DECaMP Annulus Pressue 400 psi. Installed Secondary Annulus Valve. R I U Line for Pressure Bleed Down. Bled Down Annulus to 0 psi. Recovered app. 4 bbls Diesel. R I U Circulating Lines to Tree. PJSM-R I U DSM Lubricator, Pulled BPV., 0 psi on Tbg. & IA. RID Lubricator. R I U Circulating Lines to Tree & Annulus. Took on 140 deg. 2% KCL Water and Mixed 40 bbls wi Safe-Surf W. Pumped Down Annulus Took Returns off Tubing to Displace Diesel out of Tubing, Pumped 100 bbls at 6 bpm, 875 psi. Switched Valves to Pump Down Tubing, Took Returns off IA. Pumped 40 bbs Safe-Surf W Pill, 150 bbls 140 deg. 2% KCL, 600 bbls 140 deg. 9.2 ppg. KCL to Displace Wellbore, Pump Rate 8 bpm, 1,400 psi. Set TWC & Tested from Below t/ 1,000 psi. BID & RID Lines PJSM-N I D Production Tree & Adaptor Flange. Terminated Control Lines. Function Tested all LDS, OK. PJSM-N I U BOP Stack. Installed Blind Shear Rams in Top, 3-1/2" x 6" Variable Rams in Bottom. N I D, Switched and N I U HCR's. M I U Choke & Kill Lines. Repaired Accumulator Valve on Koomey PI U & M I U BOPE Test Jt. R / U Test Manifold and Lines. Filled Choke Manifold and BOP Stack wi Water. PJSM-Tested BOPE, Tested all choke manifold valves, Annular, Blind Rams, Choke & Kill HCR & Manual Valves, Floor Safety Valve, Dart Valve, Upper & Lower IBOP to 250 psi low fl 5min. & 3,500 psi high f/5 min. All Tests Held wi No Leaks or Pressure Loss. AOGCC Rep. John Crisp wavied Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P 1-05 P 1-05 WORKOVER DOYON DRILLING INC. DOYON 16 .·;båte From.. 'To HoürsTcisk' Code NPT Phase 3/2/2005 04:00 - 06:00 2.00 MOB P 06:00 - 08:30 2.50 MOB P 08:30 - 11 :00 2.50 MOB P 11 :00 - 12:30 1.50 MOB P 12:30 - 00:00 11.50 MOB P 3/3/2005 00:00 - 02:00 2.00 MOB P 02:00 - 03:00 1.00 MOB P 03:00 - 06:00 3.00 MOB P 06:00 - 12:00 6.00 MOB P 12:00 - 15:30 3.50 MOB P 15:30 - 18:00 2.50 MOB P 18:00 - 21 :00 3.00 MOB P 21 :00 - 23:00 2.00 WHSUR P 23:00 - 00:00 1.00 WHSUR P DECOMP 3/4/2005 00:00 - 01 :00 1.00 WHSUR P DECaMP 01 :00 - 04:30 3.50 WHSUR P DECaMP 04:30 - 05:00 0.50 WHSUR P DECaMP 05:00 - 07:00 2.00 WHSUR P DECOMP 07:00 - 16:00 9.00 BOPSUP P DECaMP 16:00 - 18:00 2.00 BOPSURN RREP DECOMP 18:00 - 19:00 1.00 BOPSUP P DECaMP 19:00 - 23:00 4.00 BOPSUP P DECaMP Start: 3/2/2005 Rig Release: 3/19/2005 Rig Number: Spud Date: 6/14/1993 End: 3/19/2005 ... . . '. . DescriþtiönÒf Öpenuiqh$ Printed: 3/22/2005 11: 1 0:30 AM ) ) BPEXPLQRA TIDN . (l)perê:1tions·· S4rÎ1 rt1EiryReport Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P 1-05 P1-05 WORKOVER DOYON DRILLING INC. DOYON 16 lHôurs TaskCödeNPT Page2öf1p Start: 3/2/2005 Rig Release: 3/19/2005 Rig Number: Spud Date: 6/14/1993 End: 3/19/2005 DECaMP witnessing of test. Test witnessed by BP Rep. Rodney C. Klepzig NOTE: Unable to test pipe rams because of space constraints between top of tbg. hgr. and ram cavity. RID BOPE Test Equipment & Blew Down All Lines. PJSM- Slipped and Cut Drilling Line. Serviced Top Drive R I U DSM Lubricator, Pulled TWC, RID Lubricator PJSM-M I U Baker 3-1/4" Dbl. Spear Assy. wi 3.947" Grapples Worked on Top Drive Rotary Brake. M I U Spear Assy to 4" Dp. RIH & Speared Tbg. PI U wi 20,000# to Ensure Grapples Engaged. BOLDS, Pulled on Tbg. Hgr, Came Off Wellhead wi 165,000# PI U Weight, Pulled Hgr. to Rig Floor, String Weight Up 145,000#. DECaMP B I 0 & LID Spear Assy Terminated Control Lines. B I 0 & L I D Tbg. Hgr. DECaMP M I U Circulating Head & Lines. Circulated B I U @ 10 bpm, 1,600 psi. (R/U Camco Control Line Spooling Unit While Circulating ). Blew Down Circulating Equipment and RID Same. POOH, LID 4-1/2" 12.6# Tbg, Spooled Up SS Control Line. B I 0 & LID SSSV Assy RID Camco Spooling Unit. Recovered 60 SS Control Line Bands. POOH wi 4-1/2" 12.6# 13Cr80 NSCT Tbg. Recovered 320 Jts., 3 GLM Assy, 1 Sliding Sleeve Assy, 1 SSSV Assy, 3 Tbg. Pup Jts, 1 Cut Off Jt. (19.77') Clear & Clean Rig Floor. LID Tbg Equipment. M I U Test Jt. & Test Plug and Installed. R I U Test Lines and Tested Lower Pipe Rams to 250 psi Low fl 5 min, 3,500 psi High fl 5 min, Removed Test Plug & Installed Wear Bushing (6-15/16" ID). BOPE Test Witnessed By BP Drilling Supervisor Rodney C. Klepzig. DECaMP PJSM-P I U & M I U Baker Dress Off Assy. 6-3/4" X 4-1/2" Washover Mill Shoe - 2 x WP Ext wi 4.85" X 3.80" Inside Dressing Mil - Triple Conn Bushing - Double Pin XO - 7-5/8" Scraper Spaced to Bttm. Out 12' from Tbg Stb - 2 x Junk Baskets - Bit Sub XO - Bumper Jars - Oil Jars - XO - 18 X 4-3/4" DC. BHA Total Length: 605.34'. DECaMP PJSM, Finished M I U 4-3/4" DC's. DECaMP RIH wi Dress Off BHA on 4" DP, PI U DP 1 x 1 from Pipe Shed, to 12,772'. DECaMP M I U Top Drive, Engaged Pump and Established Parameters: Pump Rate 4 bpm, 650 psi. String Weight Up 205,000#, String Weight Down 145,000#, String Weight Rotating 170,000#.60 rpm, Torque 8,500 ft I Ibs. RIH Tagged Tubing Stub 12,777' DPM. Washed Down Over Tubing Stub, 5 bpm, 900 psi, 80 rpm, Torque 10,000 ft I Ibs, Dressed off Tubing Stub 12,777' to 12,777.5'. PI U to 12,770', Shut Down Pump and Rotary, RIH w/o Pump or Rotary to Ensure Overshot Goes Over Tubing Stub, OK. DECaMP Pumped and Circulated Around 40 bbl140 deg Safe-Surf W Sweep. 9 bpm, 2,600 psi. Monitored Well, Blew Down Lines. DECaMP POOH wi Dress Off Assy. Standing Dp Back in Derrick DECaMP PJSM-POOH wI BHA, Stand Back DC's. K-Anchor Stuck In 3/4/2005 19:00 - 23:00 4.00 BOPSUP P 23:00 - 00:00 1.00 BOPSUP P DECaMP 3/5/2005 00:00 - 01 :30 1.50 EVAL P DECaMP 01 :30 - 02:30 1.00 BOPSUPP DECaMP 02:30 - 03:00 0.50 PULL P DECaMP 03:00 - 04:00 1.00 EVAL N RREP DECaMP 04:00 - 04:30 0.50 PULL P DECaMP 04:30 - 05:00 0.50 PULL P 05:00 - 06:30 1.50 PULL P 06:30 - 09:30 3.00 PULL P DECaMP 09:30 - 19:00 9.50 PULL P DECaMP 19:00 - 20:00 1.00 PULL P DECaMP 20:00 - 21 :00 1.00 BOPSUPP DECaMP 21 :00 - 00:00 3.00 CLEAN P 3/6/2005 00:00 - 01 :00 01 :00 - 12:30 1.00 CLEAN P 11.50 CLEAN P 12:30 - 13:00 0.50 CLEAN P 13:00 - 14:30 1.50 CLEAN P 14:30 - 20:30 20:30 - 23:00 6.00 CLEAN P 2.50 CLEAN P Printed: 3/22/2005 11: 1 0:30 AM ') ) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P 1-05 P 1-05 WORKOVER DOYON DRILLING INC. DOYON 16 Start: 3/2/2005 Rig Release: 3/19/2005 Rig Number: Spud Date: 6/14/1993 End: 3/19/2005 ·.··.·Date >From-To . Hours Task . Code NPT Description ofOþérati()ns .. 3/6/2005 20:30 - 23:00 2.50 CLEAN P DECaMP Overshot. Remove K-Anchor from O/S and UD Same. Cut Off Jt. 19.70', Pup Jt. & K-Anchor 7.90'. B/O & UD Dress Off BHA. 23:00 - 23:30 0.50 CLEAN P DECaMP Clear and Clean Floor 23:30 - 00:00 0.50 CLEAN P DECaMP PJSM-P/U & M/U Halliburton 7-5/8" Model 3L RBP on 1 Stand of DP. 3n/2005 00:00 - 06:00 6.00 CLEAN P DECaMP RIH wi 7-5/8" Haliburton RBP on 4" Dp. t/ 9,900' 06:00 - 07:00 1.00 CLEAN P DECaMP M/U Top Drive and Establish Parameters. Strg. Wt Up 150K, Strg. Wt. Dn 130K. RIH t/ 9,980'. P/U t/ 9,968'. Set RBP @ 9,968'. Stacked 30K on RBP to Verify Set. P/U t/ 9,960' to Verify Setting Tool Released from Plug. Closed Annular, Pumped Down DP and Kill Line. Pressure Tested RBP & 7-5/8" Csg. t/ 3,500 psi. f/5 min. OK. Bled Down Pressure, Opened Annular, B/O Top Drive and Blow DN TD & Kill Line. 07:00 - 10:30 3.50 CLEAN P DECaMP POH w/4" DP. B/O & UD RBP Setting Tool 10:30 - 11 :00 0.50 CLEAN P DECaMP Clear and Clean Rig Floor 11 :00 - 11 :30 0.50 CLEAN P DECaMP PJSM wi Rig Crew & Schlumberger Crew on E-Line Rig Up 11 :30 - 12:30 1.00 CLEAN P DECaMP R/U Schlumberger Equipment, M/U US IT Tool 12:30 - 16:00 3.50 CLEAN P DECaMP RIH w/ USIT Logging Tool, Log up f/4,000' t/ 2,000'. Rerun in Corrosion Mode f/3,200' t/ 2,400'. POH w/ USIT Tools 16:00 - 17:00 1.00 CLEAN P DECaMP RID Schlumberger Equipment, Cleared Rig Floor 17:00 - 17:30 0.50 CLEAN P DECaMP M/U Hallibuton 7-5/8" RBP and Setting Tool 17:30 - 19:00 1.50 CLEAN P DECaMP RIH w/ HES 7-5/8" RBP on 4" Dp t/ 3,435' 19:00 - 19:30 0.50 CLEAN P DECaMP M/U Top Drive and Establish Parameters.. String Wt. Up 85K, String Wt. Dn. 83K. RIH t/ 3,550', P/U t/ 3,542' & Set RBP. Stacked 25K to Verify RBP Set. P/U t/ 3,510' to Verify Released from Plug 19:30 - 20:00 0.50 CLEAN P DECaMP Break Circulation w/ 9 bpm./ 700 psi. 150 bbls. Shut Down Pump and Monitor Well 20:00 - 20:30 0.50 CLEAN P DECaMP Close Annular, Open Kill Line, Pump Down DP & Kill Line. Pressure Up t/ 3,500 psi. (held 15 min. OK). Bled Off Pressure, Blow Down Top Drive & Kill Line. 20:30 - 22:00 1.50 CLEAN P DECaMP POH w/ HES RBP Setting Tool 22:00 - 00:00 2.00 CLEAN P DECaMP PJSM-P/U 1 Jt. 5-1/2" Csg. and Set In Stack. Close Annular and Dump 24 x 50# Sacks of 20/ 40 Mesh Sand on Top of RBP. Open Annular, Pull & UD 5-1/2" Csg. 3/8/2005 00:00 - 01 :00 1.00 CLEAN P DECaMP P/U & M/U Casing String Cutter, Stabilizer and RIH w/4-3/4" DC's. 01 :00 - 02:00 1.00 CLEAN P DECaMP RIH wi Csg. Cutter on 4" Dp t/ 2,669' 02:00 - 03:00 1.00 CLEAN P DECaMP M/U Top Drive and Establish Parameters. String Wt. Up 87K, String Wt. Dn. 85K.Pump 2.5 bpm @ 250 psi. RIH t/ 2,710', P/U 2,700'. Looking for Collar. Increase Pump t/ 3 bpm @ 300 psi. RIH t/ 2,744', Located collar. P/U t/ 2,705', Located Collar. RIH t/ 2,724'. Engage Cutters wi 3 bpm 1300 psi, 80 Rotary rpm, 3K to 5K Torque. Observe Pump Pressure Increase t/ 340 psi. & Torque steady @ 4K when Cutters Penetrated Casing. Shut Down Pumps and Rotary & P/U 5'. Bring on Pumps t/ 3 bpm/ 300 psi. and Slowly Slack Off Until Cutters Engaged Cut and took 5K Dn. Wt. 03:00 - 04:00 1.00 CLEAN P DECaMP Observed Well Trying to U-Tube, 40 psi on OA. Opened Up OA and Let Well Flowapp. 10 bbl. Engaged Pumps to Verify Cut and Pumped Additional 20 bbl @ 5 bpm, Partial Returns. Pump 75 bbls 180 deg. Diesel with Hot Oil @ 2 bpm. Final Circ. Pressure 900 psi. Followed by 30 bbl140 deg. 9.2 ppg KCL. Printed: 3/22/2005 11: 1 0:30 AM ) ) BPEXPLORATION. ' . . . >Qperations$u rn'l't1åry,A~por~ Let Diesel Soak in OA Pump 20 bbl Detergent Sweep followed by 155 bbl. 140 deg 9.2 ppg KCL. Partial Returns Pump 75 bbl150 deg. Diesel w/ Hot Oil. No Returns Let Diesel Soak in OA Pump 20 bbls. Detergent Wash followed by 100 bbls. 140 deg. 9.2 ppg KCL. Partial Returns @ 5 bpm. POH w/ Casing Cutter & UD Same Clear and Clean Rig Floor M/U Pack-Off Retrieving Tool and Pull Pack-Off. Install Bowl Protector, UD Running Tool PJSM-M/U 7-5/8" Spear. RIH and Spear Casing. POH Csg. t/ Rig Floor. Up Wt. 11 OK Circulate 200 bbl 9.2 ppg KCL. Partial Returns B/O & UD Spear and Hgr. Blow Down Top Drive and Return Circulating Line. R/U Back Up Tongs for Pulling Csg. PJSM-POH w/ 7-5/8" Csg. Recovered Hgr. & Pup. 68 Full Jts. . & Cut Off Jt. @ 18.99' Clear and Clean Floor P/U & M/U 9-5/8" Washpipe and RIH, Stacked Out @ 24' in. Contacted FMC about Internal Casing Spool Dimensions. Casing Spool has False Bowl Installed wi 9-5/8" ID.After Conferring with Anchorage Personal Decision was made to forego Washpipe Run. Will Continue with 7-5/*' Back-Off BHA Assy. DECaMP Phase 3 Condition Declared. Put on Notice From Acting Area Manager Jerry Bixby and HSE Advisor Herb Williams to Cease Operations Until Weather Conditions Improve. Took Fuel, Fresh Water & Gray Water Readings on Hand and Reported Consumption Rate and Time Frame to IMT Team. Phase 3 Conditions, Wait On Weather-Monitor Well for Fluid Loss. No loss. Work on Top Drive. M/U BHA #5: Mule Shoe, XO, 9-Drill Collars, XO, Blanking sub, XO, 3-sections of Back-off Tool, Pump Out Sub. RIH BHA #5 on 4" DP from derrick. Filling DP Every Std. and Topping Off Every 5. String Wt Up 83K PJSM-C/O Bails to Allow Room for Circulating Head Pin between Elevators and Pipe Grabber on Top Drive. M/U Circulating Head Pin, Position Drill String, Lower Slips Set @ 2,752', Upper Slips Set @ 2,732'. Pressure Up t/ 1,200 psi to Set Slips. S/O t/ 75K to Verify Slips Set. Bled Pressure Dn. t/ o psi. and Continue to S/O t/ 45K, (string wt.) Pressure Up t/ 3,000 psi. Observed 1/4 Turn to the Left in Drill String. Bled Pressure Back t/ 0 psi. to Recycle Tool. Bring Pressure back Up t/ 3,000 psi. No Reaction In Drill String. Repeat Pressure Cylce With No Apparent Tool Function. Repeat Pressure Cycle 2 More Times, Increasing Lag Time Between Cylces Allowing More Time for Tool to Reset W/O Success. Reposition Tool, Lower Slips Set @ 2,747' & Upper Slips Set @ 2,737'. Pressure Up t/ 3,900 psi. No Pipe Movement At Surface. Install 1/4 Left Hand Turn in Drill String W/O Success, Bled Dn. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P 1-05 P 1-05 WORKOVER DOYON DRILLING INC. DOYON 16 'Date· From- To Hours Task Code NPT Phase 3/8/2005 04:00 - 04:30 0.50 CLEAN P DECaMP 04:30 - 05:00 0.50 CLEAN P DECaMP 05:00 - 06:00 1.00 CLEAN P DECaMP 06:00 - 06:30 0.50 CLEAN P DECaMP 06:30 - 07:00 0.50 CLEAN P DECaMP 07:00 - 09:00 2.00 CLEAN P DECaMP 09:00 - 09:30 0.50 CLEAN P DECaMP 09:30 - 10:30 1.00 CLEAN P DECOMP 10:30 - 12:00 1.50 CLEAN P DECOMP 12:00 - 12:30 0.50 CLEAN P DECaMP 12:30 - 13:00 0.50 CLEAN P DECOMP 13:00 - 14:00 1.00 CLEAN P DECaMP 14:00 - 17:30 3.50 CLEAN P DECaMP 17:30 - 18:00 0.50 CLEAN P DECaMP 18:00 - 21 :30 3.50 CLEAN P DECOMP 21 :30 - 0.00 CLEAN P 3/9/2005 00:00 - 14:00 14.00 CLEAN P DECOMP 14:00 - 15:00 1.00 FISH N RREP DECaMP 15:00 - 17:00 2.00 FISH P DECaMP 17:00-19:00 2.00 FISH P DECaMP 19:00 - 19:30 0.50 FISH P DECaMP 19:30 - 22:00 2.50 FISH P DECOMP Start: 3/2/2005 Rig Release: 3/19/2005 Rig Number: Spud Date: 6/14/1993 End: 3/19/2005 .. ... Description 9t. OperCitions Printed: 3/22/2005 11: 1 0:30 AM ) ) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P 1-05 P 1-05 WORKOVER DOYON DRILLING INC. DOYON 16 Start: 3/2/2005 Rig Release: 3/19/2005 Rig Number: Spud Date: 6/14/1993 End: 3/19/2005 · Datè Fr()m·..~·Tö ··Houl"s m~sk Code NPT Phase . ... DesëriptiqnofOperéitions· 3/9/200S 19:30 - 22:00 2.S0 FISH P DECaMP Pressure. Reposition Tool, Lower Slips Set @ 2,750' & Upper Slips Set @ 2,730'. Pressure Up t/ 3,900 psi. No Pipe Movement. Bled Off. Install 1 Turn to the Left wi rotary Table and Hold. Pressure Up t/ 3,900 psi. Beld Dn. Pressure and Released Torque in Drill String. Got Back 1/4 Turn. Repeat Cycle W/O Success. Reset Lower Slips @ 2,740', Upper Slips Above Stub @ 2,720'. Pressure Up t/ 3,000 psi. to Function Test Tool. No Drill String Movement. Decision was Made to POH and Inspect Tools. 22:00 - 22:30 0.50 FISH P DECaMP Drop Dart and Open Circulating Sub, RID Circulating Head Pin 22:30 - 00:00 1.S0 FISH P DECOMP POH wi Back-Off BHA 3/10/200S 00:00 - 02:00 2.00 FISH P DECOMP UD Complete Back-Off Assy. & Functioned Tested On Skate. Back-Off Tools Functioned Correctly. POH wi DC's & Stand Back In Derrick 02:00 - 02:30 O.SO FISH P DECaMP Clear and Clean Rig Floor 02:30 - 03:00 O.SO FISH P DECaMP Service Top Drive and Iron Roughneck 03:00 - 04:00 1.00 FISH P DECaMP Wait On Schlumberger, Load 4-1/2" Tbg in Pipshed, Strap & Rabbit Same 04:00 - 06:00 2.00 FISH P DECaMP PJSM wi Schlumberger, Spot Unit, R/U Sheaves, Make E-Lirie Connections and Test same. 06:00 - 07:00 1.00 FISH P DECaMP RIH wi 6-Strand x 6' Strinshot, log on depth, position across collar @ 2,742' and fire successfully. Fired from 2,739' to 2,34S'. 07:00 - 07:30 O.SO FISH P DECOMP Phase 3, Level 3 weather across field. Called IMT, Field Manager Jerry Bixby to alert him that we needed to safe-out our well and were advised to POOH. POOH to allow BOPE actuation, if needed. When tool pulled to floor, found that the firing head had disengaged from the logging tool. 07:30 - 09:30 2.00 FISH P DECaMP Wait on weather. 09:30 - 12:00 2.S0 FISH P DECaMP Phase 2, Level 3. Herb Williams clarified tha once we could plow to K-Pad road, we could declare the Point Mcintyre 1 access road as Phase 2, Level 2. RID SWS E-liners, call SWS Slick-liners to clear them for transfer of a unit to P1-0S. 12:00 - 20:00 8.00 FISH P DECOMP Wait on SWS Slick-Line Unit. They were hung-up due to a white-out condition from Security Gates to Deadhorse. An overshot guide for the fishing tool has been procured from Baker. The Slickline Unit will be escorted to Pt Mcintyre from PBOC starting @ 1730 hrs. 20:00 - 22:00 2.00 FISH P DECaMP PJSM w/ Rig Crew and Schlumberger Crew. Spot Unit, R/U Sheaves and Slickline. M/U Baker 6.25" Cut Lip Overshot wi 1.66" Grapple, XO, 1-7/8" x7' Long Stroke Spangs, 1-7/8" x4' Oil Jars, 1-7/8" x 8' Stem, 1-3/4" x 6" Rope Socket 22:00 - 00:00 2.00 FISH P DECaMP RIH wi Overshot on .12S' Slickline. Tagged @ 272S' (7-S/8" stub), Worked Through Stub and Continued In Hole t/ 3,S24'. Set Dn. 2 Times, Observed Overpull of 600#. POH wI Overshot-No Fish, Inpected Grapple, One Impact Mark on Btm. of Grapple. 3/11/200S 00:00 - 06:00 6.00 FISH P DECaMP RIH wi Overshot & 1.66' Grapple, (run #2). Tagged @ 3,53S', Set Down S Times, POH, Observed Overpull of 1,000# First 200' off Btm. No Fish. Inspected Grapple, 2 More Impact Marks Close to the First Mark. Install Knuckle and RIH wi Overshot (run #3), Tagged @ 3,537', Jarred Dn., POH-No Fish, No New Marks on Grapple, Remove Knuckle and RIH Printed: 3/22/2005 11: 1 0:30 AM ) ) Legal Well Name: P 1-05 Common Well Name: P 1-05 Spud Date: 6/14/1993 Event Name: WORKOVER Start: 3/2/2005 End: 3/1 9/2005 Contractor Name: DOYON DRILLING INC. Rig Release: 3/19/2005 Rig Name: DOYON 16 Rig Number: Date FromJTÓ Hours Task Code: NPT Descriþtion· Ofºperati()~s· . 3/11/2005 00:00 - 06:00 6.00 FISH P DECaMP (run #4), Work Overshot and POH-No Fish, No New Marks. Rermove Overshot and Attach 4.5 " LIB, RIH (run #5), Unable to Get By 7-5/8" Stub, POH, RIH wi 4" LIB wi 4.5" Stablizer Above It. Tagged @ 3,538', POH, No Definitive Impression. Attach 4.5" LIB wi Knuckle & RIH, Tagged @ 3,538', POH, Nothing but Sand Imprint. 06:00 - 07:00 1.00 FISH P DECaMP M/U Pump Bailer wi jars. 07:00 - 12:00 5.00 FISH P DECaMP RIH and tag sand @3,538'. Work Bailer and POOH. Recovered 1-1/2 gallons of sand. No tell-tale marks to indicate small diameter tool inside mule-shoe. RIH wi cleaned Bailer and re-tag @ 3,538'. POOH and recover 3 gallons of sand. No tell-tale marks. RIH to 3,538', work Bailer, POOH. Recover 1 gallon and find a mark on the throat edge of the mule shoe that we interpreted to be from the top of the fishing neck of the RBP. 12:00 - 18:00 6.00 BOPSUR P DECaMP R/U for and test BOPE to 250/3,500 psi per AOGCC and BP requirements. John Crisp, AOGCC Rep, waived witnessing the BOPE tests. 18:00 - 18:30 0.50 BOPSUF P DECaMP Bleed down BOPE test. Remove Test Plug & Install Wear Ring 18:30 - 00:00 5.50 FISH P DECaMP PJSM-R/U Schlumberger Slickline Sheaves and 3.5" Bailer for Dump Bailing 20/40 mesh sand on top of RBP @ 3,542'. Drop 1 Sack per Bail Run, 10 Sacks Total. Run # 1 Failed, Dump Release Pin Did Not Shear, Replaced Steel Pin with Brass Pin and Try Again. Run # 2 Failed, Pin Sheared, Dump Release Jammed with Sand. Remove "O"-Ring on Dump Valve & Rerun. Run # 3 Successful 3/12/2005 00:00 - 07:00 7.00 FISH P DECaMP RIH wi 3.5" Dump Bailer. Dump 10 x 50 # Sacks 20/40 Mesh Sand On Top of RBP @ 3,542'. 1 Sack per Run, Total of 10 Sacks, all runs successful. Top of sand is @ 3,528'. 07:00 - 08:00 1.00 FISH P DECOMP PJSM, RID Schlumberger, prepare DP handling eqpt for RIH wi Backoff BHA. 08:00 - 10:00 2.00 FISH P DECaMP M/U BHA #6: Mule Shoe, XO, 18-Drill Collars, XO, Blanking sub, XO, Bottom Backoff Anchor, Backoff Tool, Top BIO Anchor, Pump Out Sub, XO. 10:00 - 12:00 2.00 FISH P DECaMP RIH wi BHA #6 on 4" DP from Derrick. 12:00 - 13:00 1.00 FISH P DECaMP Start pump and set top Anchor @ 2,732' and work tool in pressure cycles from 0 to 1,400 psi decreasing to 0 to 700-800 psi for 13 cycles. The initial breakout was @ 1 ,400 psi or -9,000 ft-Ibs of applied torque. 13 cycles produced slightly over 4 complete rotations. 13:00 - 15:30 2.50 FISH P DECaMP Drop Dart to open Pump Out sub. POOH wI BHA #6 and Break-out and UD Back-off Tools. 15:30 - 16:00 0.50 FISH P DECaMP Service Top Drive. 16:00 - 17:30 1.50 FISH P DECOMP BIO and UD 9-DCs. SIB 3-Stands of DCs. 17:30 - 18:00 0.50 FISH P DECaMP M/U BHA #7: 3-1/2" Bullnose, 4-3/4" Spear Packoff Assy, XO, 5-3/4" Spear wi 6.676" Grapple, Stop Ring, 5-3/4" Stop Sub, XO, Bumper Sub, XO, 9-Drill Collars. Noticed Rotating Head Assy. on Top Drive Loose. 18:00 - 19:00 1.00 FISH N RREP DECaMP POH and UD BHA 19:00 - 00:00 5.00 FISH N RREP DECOMP Troubleshoot Loose Rotating Head Assy. Break Out Saver Sub and Lower IBOP. Remove Grabber and Disassemble Lower Rotating Head Assy. 3/13/2005 00:00 - 10:00 10.00 FISH N RREP DECaMP Repair Top Drive, Disassemble Lower Rotating Head Assy. Printed: 3/22/2005 11: 1 0:30 AM ) ) . . : BPE!<F>L()RATrION· . . ··Qpêr~t:ion~.·..·$LlmI11êJrY ·.·Ff~port.·. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P1-05 P1-05 WORKOVER DOYON DRILLING INC. DOYON 16 Date····· Frpm.-To Hours ···Tåsk Cöde ··.NPT ·Phase 3/13/2005 00:00 - 10:00 10.00 FISH N RREP DECOMP 10:00 - 12:00 2.00 FISH P DECOMP 12:00 - 13:00 1.00 FISH P DECaMP 13:00-14:00 1.00 FISH P DECaMP 14:00-18:00 4.00 FISH P DECaMP 18:00 - 20:00 2.00 CASE P TIEB1 3/14/2005 20:00 - 00:00 00:00 - 04:30 04:30 - 06:00 RREP TIEB1 TIEB1 TIEB1 4.00 CASE 4.50 CASE 1.50 CASE N P P 06:00 - 10:30 4.50 BOPSUPP TIEB1 10:30 - 12:00 1.50 BOPSUPP TIEB1 12:00 - 13:30 1.50 BOPSUPP TIEB1 13:30 - 15:00 1.50 REMCM-P TIEB1 Start: 3/2/2005 Rig Release: 3/19/2005 Rig Number: Spud Date: 6/14/1993 End: 3/19/2005 : Déscr~ptioq9f·QþeratiohS Torque Upper Base Plate Bolts & Safety Wire Same. Reassemble Lower Rotating Head, M/U Lower IBOP & Saver Sub. Install Grabber. M/U BHA #7, and RIH on DP from Derrick. P/U wt 84K, SIO wt 83K. Lower BHA and set into 7-518" stump. Make 7-revolutions to back-out the stump. Pulled to 85K, but no go. Slack-off to 84K, back-out one more turn, then pull to 86K and no go.· Repeat for 10 more revolutions wi same results, so decide to POOH, seeing no additional drag. POOH and S/B4" DP. The 20.92' long, 7-5/8" Stump was attached to the Spear. Threads on the pin were in very good shape, showing no galling or drag marks. There were no signs of cement bonding, but there were several areas around the casing that had thin layers of fine, mushy sand stuck to the surface, which were easily scraped off. Clear and clean rig floor and R/U up for 7-5/8" handling equipment. RIH wi Triple Connector, 3 ea. 10' x 7-5/8" BTC Pups, ES-Cementer, Vam Top HC x BTC XO JT., 7-5/8", 29.7# L-80 Vam Top HC Casing tieback to 2,740'. Tagged @ 35' in, suspect parted 10-3/4" Csg. This is approximately where the level of our fluid has been staying. Skate Cable Broke Remove Old Skate Cable and Install New Cable RIH wi 7-5/8" 29.7# L-80 Vam Top HC Csg. M/U Top Drive & Establish Parameters, String Wt. Up 11 OK, String Wt. Dn. 11 OK, Rotary Wt. 108K, Rotary RPM 5, Pump Rate 2 bpm @ 30 psi. Shut Down Rotary & RIH and Tagged @ 2,731', Establish Rotary @ 5 RPM and Weight Fell Off. Continue RIH t/ 2,735', Observed Pressure Increase to 70 psi. Shut Down Pumps and Continue to Rotate and Make Up Connection until Final Torque of 11,000 ft/lbs was Achieved. Pressure Tested Csg. t/ 2400 psi fl 30 min. Good Test. Bled Down Pressure & Pulled 160K. Slack off string wt and prepare to split BOP Stack to install Emergency Slips. Split BOP Stack, Install False Bowl, Emergency Slips, and temporary Seal. N/U BOP Stack. Install Schlumberger Cementing Head. PJSM wi Schlumberger, Halliburton, Veco, and Doyon personnel. Based on input from participants, change line-up for returns to Cuttings Tank. Pressure Test BOP. Break circulation, returns at surface almost immediately. Begin wi 2 Bbls freshwater, then 2 Bbls neat Arctic Set 1 Slurry, followed by 20 Bbls Arctic Set 1 mixed wi 40# CemNet and 200# Bentonite. Pump 100 Bbls neat Arctic Set 1 Slurry, followed by 10 Bbls freshwater. Then Start rig pump and pump 124 Bbls 9.2 ppg KCI from Mud Pits. See pressure begin to rise @ - 122 Bbls and build from 900 psi to 1,940 psi and see cementer shift. Continue to 2,300 psi and SID Rig Pump. Returns stopped after -80 Bbls of the cementing stage were pumped, then at - 125 Bbls, returns began again and -2 Bbls before the plug bumped, the returns had cement. Upon cleaning the return line, more cement came through the Printed: 3/22/2005 11: 1 0:30 AM ') ) . BPEXPl._ORATION . . Oip~r~tiOn$ S:LJ.O"I lTI~ry!Aep()rt Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P1-05 P1-05 WORKOVER DOYON DRILLING INC. DOYON 16 PageBof10 Start: 3/2/2005 Rig Release: 3/19/2005 Rig Number: Spud Date: 6/14/1993 End: 3/19/2005 Date Frorn-ToHours Task: Code NPT 3/14/2005 1.50 REMCM-P TIEB1 13:30 - 15:00 15:00 - 16:00 1.00 REMCM-P TIEB1 16:00 - 22:00 6.00 BOPSUP. P TIEB1 22:00 - 23:00 1.00 BOPSUR P TIEB1 23:00 - 00:00 1.00 P TIEB1 3/15/2005 00:00 - 01 :00 1.00 CASE P TIEB1 01 :00 - 01 :30 0.50 CASE P TIEB1 01 :30 - 02:30 1.00 CASE P TIEB1 02:30 - 03:30 1.00 CASE P TIEB1 03:30 - 04:00 0.50 CASE P TIEB1 04:00 - 06:00 2.00 CASE P TIEB1 06:00 - 08:00 2.00 CASE P TIEB1 08:00 - 08:45 0.75 CASE P TIEB1 08:45 - 10:00 1.25 FISH P TIEB1 10:00 - 11 :30 1.50 FISH P TIEB1 11 :30 - 14:30 3.00 FISH TIEB1 P cuttings chain. Estimate that 1 to 1-1/2 Bbls of watery cement were returned to cuttings tank. Cement in Place @ 1500 hours. RID Schlumberger, clean return lines and cement lines. RID Cementing Head. NID BOP and Remove Temporary Pack-off. Drain Fluid from XO Jt. & Make Primary Cut. Remove XO Jt. from BOPE's. Remove Drlg. Nipple Because of Height Constraints. P/U BOPE & Set Pack-off. N/U BOPE. Install Wear Ring Test Pack-off to 3,500psi. Observe Pressure Loss of 400 psi. Pump Back Up to 3,500 psi. 400 psi Pressure Loss. Bled Down Pressure, Test Fluid Aired Up. Pump Fluid Until No Air in Returns. Pressure up to 3,500 psi. Presuure loss of 50 psi Over 30 min. Test Witnessed by BP Drilling Supervisor Rodney C. Klepzig P/U & M/U BHA #8. HTC STX-1 6-3/4" Bit (3-20's), 2 ea Boot Baskets, 7-5/8" Csg. Scraper, XO, Bumper Sub, Oil Jars XC, 9 DC's = 313.75' RIH wi BHA #8. on 4" DP Service Top Drive & lronroughneck RIH wi 4" DP tJ 2700' M/U Top Drive & Establish Parameters. String Wt Up 80K, String Wt Dn. 80K, Rot String Wt. 80K, Pump Rate 5 bpm, Pump Pressure 300 psi., Rot. RPM 50, Off Btm Torq. 2k ft/lbs., On Btm Torq. 4 to 7K ft/lbs. SIO & Tag @ 2,703'. Drill ES Cementer f/2,703 t/2,705'. P/U t 2,700' and Ream Dn. t/ 2,710'. Repeat Twice. Wash Dn to 2,800' BIO Top Drive, Stand Back 1 std. 4" DP. Blow Down Top Drive. Install Circulating Head Pin & Test Csg. t/ 3,500 psi. Bleed Pressure Down, Blow Dn. Lines & RID Same, BIO Circulating Head Pin. POOH and SIB DP and DC's. BIO BHA and clean junk baskets, find some small bits of rubber. M/U BHA #9: 6-5/8" Reverse Circ Jet Basket wi Mill Shoe Extension, Double Pin Sub, 2-Boot Baskets, Bit Sub, Bumper Sub, Oil Jar, XO, and 9-DCs. RIH BHA #9 and tag hard fill @ 3,523'. (Center of RBP @ 3,542', top of 2.25" Fishing Neck @ 3,538'). Establish Parameters; P/U wt 90K ,SIO wt 85K, WOB 2-3K, 4 BPM, 80 RPM. Work down to 3,528' and recover cement and sand over shakers. Stop Rotating, increase rate to 10 BPM, 2,900 psi and WID to 3,538'; progress stops. P/U 5' and slowly WID to stop at same spot. Repeat again, then put 2K on bit, rotate one revolution and make -1' of progress to 3,539'. P/U 5' and slowly WID to stop at 3,539'. Put 2K on bit, rotate one revolution, and make -1' to -3,540'. P/U and circ, then decide to POOH. During the entire process, recovered lots of sand, bits of cement plug rubber, aluminum flakes, paint, and blue tape. POOH and SIB DP and DC's. BIO BHA #9. Recovered the entire String Shot fish: the Firing Head, 6' of 1/2" steel rod, and the 2-1/2" x 3" long Bull Nose. The Jet Basket also held large chunks of Cementer aluminum sleeve and chunks of Cement Printed: 3/22/2005 11: 1 0:30 AM ) ) E3P EXPLORATION QpE!ratioO$·ßu I11marYFlE!port Start: 3/2/2005 Rig Release: 3/19/2005 Rig Number: Phase Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P 1-05 P 1-05 WORKOVER DOYON DRILLING INC. DOYON 16 Date From~To Hours Task Code NPT 3/15/2005 11 :30 - 14:30 3.00 FISH P 14:30 - 15:30 1.00 FISH P 15:30 - 16:45 1.25 FISH P TIEB1 TIEB1 TIEB1 16:45 - 18:30 1.75 FISH P TIEB1 18:30 - 21 :00 2.50 FISH P TIEB1 21 :00 - 22:00 1.00 FISH P TIEB1 22:00 - 22:30 0.50 FISH P TIEB1 22:30 - 23:00 0.50 FISH P TIEB1 23:00 - 00:00 1.00 FISH P TIEB1 3/16/2005 00:00 - 00:30 0.50 FISH P TIEB1 12:30 - 01 :30 13.00 FISH P TIEB1 01 :30 - 07:00 5.50 FISH P TIEB1 07:00 - 08:30 1.50 FISH P TIEB1 08:30 - 13:45 5.25 FISH P TIEB1 13:45 - 17:00 3.25 FISH P TIEB1 page 9öfl0 Spud Date: 6/14/1993 End: 3/19/2005 Plug rubber. Joy in Camp. M/U BHA # 10: HES RBP Overshot and RIH on DP from Derrick. Establish parameters: 6.3 BPM, 360 psi, P/U wt 85K, SIO wt 82K. Slowly lower down over RBP Fishing Neck and see pressure climb to 520 psi. Set down to 50K, Turn to right for 3/4 turn, P/U to 85K and move RBP slightly. Relax to 50K and repeat cycle. Rotate 3/4 turn. SID pump and repeat cycles again. P/U to 85K and rotate full turn. RBP is free, so lower another 10 feet to ensure RBP is free, then start pump and circulate Bottoms Up. POH wi top RBP, SIB DP. Breakout and LID RBP. RIH wi same BHA to pull bottom RBP. Tagged up at 9913'. Had 51 I of fill from top of RBP at 9964'. P/U off bottom, established parameters: P/U wt 70K#, SIO wt. 116K#. R/U test equipment: 'T', valve and swing to drill string, pressure line to chart recorder. Tested 7-5/8" casing, recorded pressure at 3500 psi for thirty minutes, held ok. RID test equipment. R/U to reverse circulate. Established parameters: engaged pump at 4 bpm - 380 psi. Rot. wt. 143K# at 40 rpm. Washed down, with minimum drag, FI 9913' T I 9958'. Closed annular, opened kill line. Took 25K # wt. Reverse circulated BU, while washing and working 3-3/8" aD JDC OS to top of RBP at 9964' . Observed increase in pressure to 880 psi. Had high volume of oily dark colored sand observed across shakers. Circulated additional BU until no sand at shakers. Final pressure 790 psi psi at 5 bpm. Total pump strokes reverse circulating 3013 strokes. Opened annular. Blew down kill line. Lined up to circulate long way and unseat RBP. Overpulled 5K# above 175K# P/U wt. Set 35K# down and made two right hand turns. Worked string up to 175K# P/U wt. Got release at 165K#. Let element relax 15 minutes. Ran back in to just below 9964' and confirmed catch. Engaged pump at 8 BPM 1470 psi. Circulated annular capacity. Total pump strokes 3295psi. Monitored well, no gas. Well stable. final pressure 1670psi. Held PJSM. BIO top drive, blow down same. POOH slowly wi RBP. A 1" x 1-1/2" chunk of Bronze metal was found jammed between the Overshot and the fishing neck of the RBP. PJSM. M/U BHA #11: 2-3/8" JDC Overshot, XO Sub, 3-joints 2-7/8" PAC DP, XO Sub, Bumper sub, Oil Jar, Pump Out Sub, XO Sub, 9-DCs. RIH to Retrieve 3-3/8" Baker IBP @ 12,835'. Parameters @ 12,770': P/U wt 228K, SIO wt 125K. Establish circulation, 3.8 BPM @ 530 psi. SID pump and slowly RIH from 12,770'. Stop progress @ 12,807'. P/U and rotate 1/2 turn, slowly work back down to 12,807'. P/U and repeat cycle. Establish circulation, 7.1 BPM @ 770 psi. SID pump, realign valves and Rev Circ 6 BPM @ 1400 psi. Work down to 12,815'; increase to 8 BPM @ 2,300 psi. and continue to Rev Circ for 350 Bbls. Recovered steady flow of fine, oily sand over the Printed: 3/22/2005 11: 1 0:30 AM ) ) . ·i3PEXPLORATION . .... .. .. . ·Qperªti()ns Slim marY8eport Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P 1-05 P 1-05 WORKOVER DOYON DRILLING INC. DOYON 16 Start: 3/2/2005 Rig Release: 3/19/2005 Rig Number: Spud Date: 6/14/1993 End: 3/19/2005 . [)a.te From J To Hours .. Ta.sk Cpde NPT Phase .. .... DescriþtionofOperaJions 3/16/2005 13:45 - 17:00 3.25 FISH P TIEB1 Shakers which changed to a large-grained, multi-colored sand return. May have recovered more than 1-Bbl of sand before the returns were clean. SID and re-align for Long-way Circ. See a quick pressure increase while slowly lowering to 12,818'. Slack off until wt is 50K, then P/U to 235K and hold for 30 minutes. Slack-off, then P/U and the IBP released. POH one stand to clear IBP from packer and monitor well. Fluid level slowly dropped. First fluid loss was 1/2 Bbl/min; 2nd fluid loss was 1-1/2 to 2 Bbls/min. 17:00 - 00:00 7.00 FISH P TIEB1 POOH. LID Drill Pipe. Double displace every five stands out. 3/17/2005 00:00 - 07:00 7.00 FISH P TIEB1 POOH. LID Drill Pipe. Double displace every five stands out. R/U 2-7/8" elevators and tongs, LID 2-7/8" PAC DP and IBP. No visible damage to IBP. 07:00 - 07:30 0.50 RUNCOMP RUNCMP Pre-Job safety Meeting wi all hands and Baker Packer Expert. 07:30 - 00:00 16.50 RUNCOMP RUNCMP P/U completion accessories and make up per instructions from Baker Packer-Rep. BakerLok all connections below the Packer. RIH w/completion, Torque Turn all 4-1/2", 12.6 ppf, 13Cr85, Fox connections to 4,280 ft-Ibs. Use Jet Lube Seal Guard on same. 3/18/2005 00:00 - 10:30 10.50 RUNCOMP RUNCMP RIH wi 4-1/2", 12.6#, 13Cr85, Fox completion to jt 324. M I U Control Line to Safety Valve Landing Nipple, continue running completion, banding each joint. Utilized 70 SS Bands. 10:30 - 11 :30 1.00 RUNCOMP RUNCMP P/U Tubing Hanger wi 4-1/2", TCII Landing Joint. Completions String P/U wt 156K, SIO wt 115K. Pass Control Lines thru pentrations in Tubing Hanger and install packoffs. Land Tubing, RILDS. Test Control Lines to 5K for 10 minutes--OK. 11 :30 - 15:30 4.00 RUNCOMP RUNCMP Drop Ball and Reverse Circulate 180 Bbls of 140 F, 9.8 ppg Brine (2% KCI + NaCI) and 400 Bbls 9.8 ppg Brine mixed wi 2 Bbls Correxit Corrosion Inhibitor. Circulated 513 Bbls and did not lose returns, but hauled off 290 Bbls and captured 70 in the Pits to be hauled when Diesel is circulated around for Freeze Protect. 15:30 - 18:00 2.50 RUNCOMP RUNCMP Realign valves and pressure up on tubing to set Packer. Increase pres to 3500 psi, hold and chart for 30 mins--good test. Realign Valves and PT annulus to 3500 psi, hold and chart for 30 mins--good test. Bleed pressure on both sides, then pressure up on annulus to shear the DCK valve in the #4 GLM. Sheared @ 2600 psi. 18:00 - 18:30 0.50 RUNCOMP RUNCMP RID landing jt., blow down lines. 18:30 - 19:00 0.50 BOPSUP P RUNCMP Set TWC valve, test to 1000 psi -Held Ok. 19:00 - 22:00 3.00 BOPSUPP RUNCMP ND BOPE'S. 22:00 - 00:00 2.00 WHSUR P RUNCMP N/U Adapter flange and tree. 3/19/2005 00:00 - 02:00 2.00 WHSUR P RUNCMP NU tree and test to 5000 psi, OK. 02:00 - 03:30 1.50 WHSUR P RUNCMP P/U lubricator, pull TWC valve. 03:30 - 04:30 1.00 RUNCOrvP RUNCMP Reverse circulated 140 bbls Diesel. 04:30 - 07:30 3.00 RUNCOrvP RUNCMP Allow Diesel to U-tube. 07:30 - 08:00 0.50 RUNCOrvP RUNCMP P/U Lubricator and install BPV. 08:00 - 09:00 1.00 WHSUR P POST Secure Cellar and Tree. Release Rig @ 0900 hours. Printed: 3/22/2005 11: 1 0: 30 AM I TREE = '~ ,., WELLHEAD = ÄCiÚÄTOR; .. KB.ELéi; "sF.ELSi; KOP= Mâx'Angle = ,,,....",,.... "........ "". ""... Datum MD = DatumTVD = FMC FMC .."",.,...",,,..,.,,,,,,....,.., BAKERC 50' P1-0,)Proposed COmplbL~On .... ""......."........,..""..."..., 1332' .,...·,..".w......·..·,..·,...,,,,,,.'.,..·.;.,·,,·,·.·.'.. . 5!(~11!29' 13180' 8800' SS I ~ 7\ \ l-i CEMENTED TO SURFACE e I ~30ó\ l-i 4-1/2" TRSV 7-5/8" CSG, 29.7#, L-80, ID = 6.875" 1-1 12499' I , ~ GAS LIFT rv1ANDRELS ST MD TVD DEV TYÆ VLV LATCH PORT DATE 1 2 3 4 5 10-3/4" CSG, 45.5#, NT-80, ID = 9.953" 1-1 4236' L Minimum ID = 3.725" @ 12856' 4-1/2" PARKER SWN NIPPLE 4-1/2" TBG, 12.6#, 13CR-80, .0152 bpf , ID = 3.958" -i \ 2.~~7 1 I :8: I I \Øltð\ 0 l-i 4-1/2" HES "X' NIP, ID = 3.813" :8: ~ \~\c:>'301-i7-5/8" X 4-1/2" BAKER S-3 PKR ! ~ ' \;>'.J~·'·t<;l-i 4-1/2" HES "X' NIP, ID = 3.813" ~ I \ ~Cø 9ï l-i UNIQU[ MI\ CIUt ~[ OVt:K51 tOT W LJ;Q 1 :8: :8: ~ 12812H-I7-5/8" X 4-1/2" BAKER SABL-3 PKR, ID = 3.88" I ,d . ~ ~ I: 12839' -I 4-1/2" PARKER SWS NSCT NIP, ID = 3.813" II ! \ 12856' 1-1 4-1/2" PARKER SWN NSCT NIP, ID = 3.725" 12876' 1-1 4-1/2" TUBING TAIL, WLEG, ID = 4.0" I 1 1 1 ÆRFORA TION SUMrv1A RY REF LOG: CDR ON 07/8/93 ANGLEATTOPÆRF: 51 @ 13056' Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DA TE 3-3/8" 6 13056 - 13236 0 09/02/93 3-3/8" 6 13272 - 13572 0 09/02/93 I I PBTD 1-1 13724' ~ 7-5/8" CSG, 29.7#, L-80/13-CR-95, -I 13804' .0459 bpf , ID = 6.875" REV BY DATE 07/13/93 08/11/01 09/05/02 11/24/02 02/22/03 08/28/03 RN/TP BrvvTP DTRlTP ?/KAK /TLH COMMENTS ORIGINAL COM PLErION CORRECTIONS WA IV ER SAFETY NOTE GL V C/O W A IV ER SAFETY NOTE REV . WAIVER SAFETY NOTE DATE 11/30103 01/18/04 09/12/04 09/10/04 REV BY COMMENTS A TDffiP CSG CORRECTION JR/TLH OA DWNSQZ (08/22/03) A TDffiP WA IV ER SA FETY NOTE LDKlTLP SET BAKER IBP POINT MCIN1Y RE UNIT WELL: P1-05 ÆRMIT No: 1930870 API No: 50-029-22378-00 SEC 16, T12N, R14E, 1759.29' FEL & 3036.49' FNL BP Exploration (Alaska) . ( STATE OF ALASKA ( ALASKA Oil AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: AbandonD SuspendD Operation Shutdown 0 Perforate 0 WaiverD OtherD Alter CasingD Repair WellŒ) Plug PerforationsO Stimulate 0 Time ExtensionD Change Approved ProgramD Pull TubingD Perforate New Pool 0 Re-enter Suspended WellD 2. Operator 4. Current Well Class: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc. 193-0870 Development ŒJ Exploratory 0 3. Address: P.O. Box 196612 6. API Number Anchorage, Ak 99519-6612 Stratigraphic 0 Service 0 50-029-22378-00-00 7. KB Elevation (ft): 9. Well Name and Number: 49.70 P1-05 8. Property Designation: 10. Field/Pool(s): ADL-034624 Pt Mcintyre Oil Field I Pt Mcintyre Oil Pool 11. Present Well Condition Summary: Total Depth measured 13828 feet true vertical 9216.7 feet Plugs (measured) None Effective Depth measured 13725 feet Junk (measured) None true vertical 9159.3 feet Casing Length Size MD TVD Burst Collapse Conductor 80 20" 91.5# H-40 39 - 119 39.0 - 119.0 1490 470 Production 12463 7-5/8" 29.7# L-80 37 - 12500 37.0 - 8435.3 6890 4790 Production 1325 7-5/8" 29.7# 13CR95 12500 - 13825 8435.3 - 9215.0 8180 5120 Surface 4198 10-3/4" 45.5# NT-80 38 - 4236 38.0 - 3567.3 5210 2480 Perforation deDth: Measured depth: 13056 -13236,13272 -13572 RECE IVE True vertical depth: 8773.73 - 8883.16,8904.38 - 9073.87 0 Tubing (size, grade, and measured depth): 4-1/2" 12.6# 13Cr80 @ 35 - 12876 JAN 2 0 2004 Packers & SSSV (type & measured depth): 4-1/2" Baker SABL-9 Packer @ 12808 Alaska Oil & Gas Cons. Commission 4-1/2" TRCF-4A SSV @ 2308 Anchorage 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13 Reoresentative Dailv Averaae Production or Iniection Data Oil-Bbl Gas-Mef Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 3095 27.2 4859 800 941 Subsequent to operation: 2856 27.4 1910 475 1155 14. Attachments: 15. Well Class after proposed work: ExploratoryD DevelopmentŒ ServiceD Copies of Logs and Surveys run - 16. Well Status after proposed work: Operational Shutdown D OilŒJ GasD WAG 0 GINJD WINJD WDSPLD Daily Report of Well Operations. ! Prepared by Garry Catron (907) 564-4657. 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Garry Catron Nt A Printed Name Garry Catron Title Production Technical Assistant Signature 564-4657 Date 1/15/04 f~ 8fLJAN z J 100~ Form 10-404 Revised 12/2003 ~ .' ( f P1-05 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 08/03/03 T/I/O= 970/800n70. Temp hot. MITIA to 3000 PASSED. MITOA to 3000 FAILED. IA FL @ 190. (5 bbls). Bled IA from 800 psi to 400 psi fluid to surface. Pressured IA to 3000 psi with 14.5 bbls of diesel. MITIA lost 40 psi in the first 15 min 20 psi in the second 15 min. for a total of 60 psi in 30 min. Bled lAP to 700 psi down the OA. MITOA Failed. Leak rate @ 10.5 GPM @ 2350 psi. OA FL @ 84'. Started pumping down OA. OAP did not go above 2350 psi. Established LLR @ 10.5 GPM @ 2350 psi. Total test volume 210 gallons, total test time 20 min. Pumped 20 bbl of diesel total. Bled OAP to 400 psi. OAP or lAP do not have 2" intergal1s, they are R-24. Final WHP's = 970/650/350. 08/04/03 T/I/O=970/650/350. (Post MIT-IA). Temp hot. No increase in IA & OA from yesterday. 08/05/03 T/I/O=1100/650/300. CIT OA FAILED to 3000 psi. ( Eval for IA X OA Waiver). Established injection rate of 2.5 bpm @ 2200 psi (Pressure Guage @ Tree) for 55 bbls (22 min). Final WHP's=11 00/650/250. 08/21/03 Injectivity Test. Int WHP = 480/460/0 Pumped 2.5 bbls. crude down OA caught fluid est. inj. rate of 3 bpm @ 2100 psi. Pumped 150 bbls. crude down OA to est inj. rate. Bled OA to 50 psi. Recovered 2 bbls. crude Final WHP = 480/460/50 08/22/03 T/I/O = SI/480/0. OA Downsqueeze. RU OS to OA. PJSM. PT lines to 3000 psi. Started pumping down OA with 20 bbls of DS CW 101 Surfactant. Followed up with 200 bbls of freshwater 15 bbls of DS CW 101 5 bbls of freshwater spacer 20 bbls of 15.7 ppg Arctic Set 1 cement containing 1/4# per sack of celloflake and 10 bbls freshwater spacer. Displaced cement to shoe with 120 bbls of crude @ 5 bpm, slowed rate and pumped 2 bbls @ 1 bpm. Slowed rate to .5 bpm @ 1020 psi. Pumped an addional 3 bbls and OAP increased to 1175 psi. SO and monitored OAP for 10 min. OAP dropped to 950 psi in the first 3 min and appeared to stabilize out at 900 psi for the remianing 7 min. RD MOL. Checked OAP after RD. Final WHP's = SI/460/820. 08/24/03 T/I/O= 3100/480/775. (Eval for IAxOA Wav) OA FL @ Surface. 08/24/03 T/IIO = 3100/475/800. MIT - OA FAILED. CIT - OA to 3000 psi PASSED. (Post OA Downsqueeze). Pressured OA to 3000 psi with 2.3 bbls of Crude. OA lost 200 psi in approx 3 min. Re-pressured OA to 3000 psi 3 more times with the same results. Could not establish LLR with big pump. Stared CIT -OA. CIT -OA to 3000 psi. Pumped 6.4 bbls of crude to maintain 3000 psi for 30 min on the OA. Bled OA to 100 psi. Final WHP's = 3100/475/100. FLUIDS PUMPED BBLS 35 Diesel 361 Crude 225 Fresh Water 35 DS CW 101 Surfactant 20 Arctic Set 1 Cement 676 TOTAL Page 1 ~. ~ ( (' 1REE= FMC SAFETY NOTES: 4-1/2" CHROMETBG. 7-5/8" WELLHEA.D= FMC P 1 0 5 CHROMECSG. TBGHGR: Rv1CGEN BPX@35' MD. AC1UA TOR = BAKER C - ***IAxOA COMM. OPERATING LIMITS: MAX lAP = KB. ELBJ = 50' 2500 PSI, MAX OAP = 2500 PSI (08/25103 BF. B..BJ = WAIVER)*** KOP = 1332' Wax Angle = 57 @ 11729' Datum M) = 13180' 4-112" C'AMOOTRCF SSSV, ID=3.812" Datum lV D = 8800' SS (I) I 10-314" CSG 45.5# NT-80 ID = 9.953" I GAS LIFT MANDRELS , , , ST MD TVD DEV lYPE VLV LATQ-\ PORT DA.lE 1 5180 4134 54 KBMG DMY BK 11/24/02 2 7133 5288 55 KBMG DMY BK 11/24/02 3 12683 8544 54 KBMG DMY BK 7 -5/8" CSG, 29.7#, L-80, ID = 6.875" --i BAKERCMUSLlDII\G SLV, ID= 3.812" I Minimum ID = 3.725" @ 12856' I I 4-1/2" PARKER SWN NIPPLE 12812' -1 7-5/8"X4-1/2"BAKERSABL-3FKR,ID=3.88" --i 4-1/2" PARKERSWS NSCf NIP, ID=3.813" I 4-1/2" TBG, 12.6#, NT -13-CR-80, 4-1/2" TLBII\G TAIL, WLEG, ID = 4.0" .0152bpf, ID= 3.958" B..MDTTLOGGED08/12/93 ÆRFORA 1l0N SUMML\RY REF LOG: COR 0 N 0718/93 ANGLE AT TOP PERF: 51 @ 13056' Note: Refer to Produetion DB for historieal r erf data SIZE SPF INlERVAL Opn/Sqz DATE 3-3/8" 6 13056 - 13236 0 09/02/93 3-318" 6 13272 - 13572 0 09/02/93 I PBW I 13724' 7 -5/8" CSG, 29.7#, L-80/13-CR-95, .0459 bpf , ID = 6.875" DA lE REV BY COMMENTS DATE REV BY OOMMENTS PONT MCNTYRE UNIT 07/13/93 ORIGINAL COMPLEfION 11/30/03 ATD'TLP CSG CORRECllON WELL: P1-05 08/11/01 RN/lP CORRECllONS PERMIT t\b: 1930870 09/05/02 BM/lP WAIVER SAFETY NOTE API t\b: 50-029-22378-00 11/24/02 DTRffP GLV C/O SEe 16, T12N, R14E, 1759.29' FEL & 3036.49' FNL.. 02/22/03 ?/KAK WAIVER SA FETY NOTE RBJ. 08128/03 /TLH WAIVER SAFETY NOTE BP Exploration (Alaska) MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU: FROM: Julie Heusser, Vi DATE: Commissioner John H Spaulding, Petroleum Inspector April 10, 2001 SVS Tests BPX PBU LGI & PM-01 April '! I, 200!: I traveled to BPX's Lisbume Gas Injection (LGI) and also on to the Point Mclntyre PM-01 location to witness Safety Valve Testing. The AOGCC SVS test reports are attached for reference. As noted 3 failures were observed on both pads; with 2 being repaired and retested immediately. The third failure a sssv and will need further attention. Mark Wysocki, lead operator was training 2 new hires. The crew did an excellent job. Summary: ! witnessed the SVS tests on LGI and PM-01 LGI, 3 wells, 9 components, 1 failure, 11% failure rate PM-01, 11 wells, 33 components, 2 failures, 6% failure rate Attachment; Svs bpx Igi 4-10-0 ljs Svs bpx prn-01 4-10-01js Nq,n con.f, iden,,.ti,.a! Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: M~., ,k,.W.,,ysocki AOGCC Rep: John H. SEaulding Submitted By: John, Spaulding_ Date: Field/Unit/PM: Pt Mcln .ty_re/PBUfPM-0! , ,, Separator psi: LPS 460 HPS 4/9/01 I I Il I I I In . II _ Il I I [ I I .I I I[.. Il ii i ] I i WeB Pemit Separ Set L~ T~t Test T~t Date ~, WAG, G~J, .Number Number PSI PSI Trip Code Code C~de Passed G~ orCyCLE ~12 191O370 plo: ' lSS00~o :P~-o~1~b01~0 .... 4~0 ~0~ ~10~ p ~ '" ~9i-04i~o~o '" ~0 '700 ..... 700 ,p ~ ~...... 0~ P1~6~ ' ' ~%1~70 'ua0'700a7~ ' p 9 ' 'g ..... 0~ ~P~-07~s91~no ~Pi'-08'"~9~o98o' 4a6"'~5oo .... ~2oo" 'gp ' 'b " P 1-09 1961540 4~ 350 300 p P P OIL pI-ll' '' 1920860~ "460 350' 250 P ....P '~ .... ~IL ,,, , ~ pi,.~2 ..... i,9i.of36~ Pl-]3' 19'30740 460 ..... 15~ ''1'150 P '" p p ........... OIL PI-~ ...... 1930510 ' 460 " 350 280 p p ' '~ " OIL Pi~2~ " 19209~0 ~60 " 3~0 17~' " 3 P ' P ' '~/9701 oi~ :p~.2~ .... ~96i240 ................. P1~24" 1961490] ........ P~-G1 ..... 1'921~0! 3660 2906 "~56 P P P G~J , ~ , , .... , ~, , ..... , , , ,, , _t ,, ,, , , , ,t , , Wells: 11 Components: 22 Failures: 2 Failure Rate: 9.09% I-'l 9o Day Remarks: P1-08 & P1-3 were choked back,_ hence the .tfigher pil.o_.t se.tt.'mgs' P 1-20 pilot reset and._retested ................. RJF 1/16/01 Page 1 ofl 010409-SVS PM-01 PBU-js Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Mark Wysocki . . AOGCC Rep: JohnH.~Sp..au!~'m,g' Submitted By: John Spaulding Field/Uffit~ad: -Lisburne/PBU/LGI .... , ,, ., Separator psi: LPS Date: 4/9/01 HPS Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GI~J, Number Number PSI PSI Trip Code Code Code Passed GAS or CYCLE LGI-02 18~1400 3800 29001 2300 i~ e P 4/9/01 GINJ LGI-04 1880130 LGI-06 1860670 3800 2900] 2500i P P P GINJ'i LGI-08 18605;/0 ............ LGI-10 '1860690 3800 26001 2300 e P e ' " GINJ , , LGI- 12 1860540 Y?ells: 3 Components: 6 Failures: 1 Failure Rate: 16.67oA~ 9o Day Remarks:- ~ LGI-02 Pilot tripped to .low and was re.se,t.-ret .e?ext, and.passed RJF 1/16/01 Page 1 of l 010409-SVS LGI Lisbume-js P E }'i iq I T D;~,'" 'F A T .... ::, 887 93 08TM,' o~ 007 93--'087 93'~087 93 "-087 93 -' 087 o 3 '" 08 '7 93 ---08 '7 93 .... (387 93 0 / 93 '-' 087 9.3 .... (.) 8 ? ~ 8 i 0 5 8 'i 2 4 0 7 DAIL. Y W,5'.L.L. OP S I...I R V E Y (~ [~l ¢ij ~ / Il ~l ~ L :.CDN--[lWD/DC c r::, F.': -~ L '¢/i.?, / D C C [:5 l~ 'l~ ',,i E R i; L W O / D C CE'F W,/J WL GCT F' K F: F ( 8/' ?. 0/" 9 3 ) P E R F ( o / ,;., 31/93) p i-.:.. R F ( 9 / 0 2 / 9 ~ ) STAT( PRES/TEHP/ ~12900--i3181 'i l"l/.',l., '[ [:il ltl:; r' ,'. '.,./ III / I ~.{) / i ?] f~ll Ill '" j 9('}:i i 0/" i 1 / , 'i0,/'1 'i./'i993 10/" i i,. , i i)/" '1 i/' 1 !) !ii ii.'. i 1i/"'l i,/ t992, 'i i,' 'iq /ic .., /,. .. ,J., fl. ,.o,/, ,."~. ?./' i .a::, 93 0 :::', / 'i 'i ,.' O. 3/ '1 i/' i 9 ,.~o /.~ 0 ;:',/.' , ...... · ri":' 2. 3 'J 9q:,~ ., ,.; ,/!" // ,. I '1/'i ~:,/' 1993 i i/' i..q,, ..... I..:.q.c3 'i il i l::i /' i ~: q :) ., . , 1 J/'1:J/''J¢)93 ('),."":, ./'"...- .".~ ,,,: i .::.,;':' ..q. 2, i '" "'"~ i 99 'J 'J ./ '1 c.,/' .j q .:..,.._~. i:.~J !} :[ i'~ ',/' e r'~ 'L o r" y 13, AT>', T O-'"~TA PLI!S ,., .... r'y W a s 'E h e Ar'e we1 1 tests Wel'i 'i's '¥n : a m .o 'j e s r" e q u :~ r'-. e.. d '?. y e s _~; ,,...,,"' n d . ~,~,, ~:.¥'...~ 'j 'i ~}; (:) ,'" ~ ,'~''''~ ~" ~.~~ ... ~ y e s _! a i y s 'i :is & d e s c' r' ~ i' v e ,:. ! ? r' e q ,..~ 'i r' e ': :i ~ e s ~}' i:.': e c e -¥ v e d9 ~ i", o c o.rn p I i a n c e . ~i~ I Date: Subject: From: To' ARCO Alaska Inc. Greater Point McIntyre Engineering March 7, 1994 Transmittal Number 703 ARCO Alaska, Inc. Bob Crandall AOGCC 3001 Prokupine Drive Anchorage, AK 99501 The following Greater Point McImtyre Area data are enclosed. This information is confidential and your cooperation in maintaining confidentiality is appreciated: fP1-05 /ST1 ~P1-05 VST1 I1-08 /p -08 ~..ST1 c~2~1_11 ~" P1-20 P2-06 Final Log: CDR~ Ev_h_*need Resisdvi~, LWD/._.~..~.R~h Corrected__._ Final Log: C~DR LWD/Depth Correc.___~ted ~) 7/8-9/93 Schlumberger / Izq ~--- ~ %~o 5 7/8-9/93 Schlumberger / Final Log: CDN LTD/Depth Corrected (~ ~tR oo -- /%%oo FINAL Log: CDR* Ver Enid Rosi.~tivity F~AL Log: 0rue Vertigal Depth~DR ~ Tape: ~ Edit~Ny ~ 5 bit runs w/Verification Listing ~ ~2& Tape: ~ Edit ~n 2 ST bit runs (with original Well) LDWG Format P~n Log: FBS/TE~/PREgS/G~DIO/~~ Emduc¢on L~g: ~S./~3.~/PRE~G~~ Log: P~ducfion L~ F~/Temp/Pr~ ~ s / Gradio/~ LOG:Production L~ FbS/TE~/PRESS/Gradio/~ Final Log: GYRO Directional Survey (G~ ~ 7/8-9/93 2%5 Schlumberger/ ~-~ 7/18-28/93 Schlumberger 7/18-28/93 Schlumberger ~- 7~24/% Schlumberger 7/18/% Schlumberger 12/11/93 Schlumberger 12/11/93 Schlumberger ~ 12/12/93 ct000 - l o~ oO S" Schlumberger 12/12/93 ~ttmo-~t~o 5" Schlumberger 1/7/94 Schlumberger Well Name P2-30 i,~-So P2-30 P242 P2-42 P2-42 P2-42 p~2P2-51 -51 Data Description FINAL LOG:~Compensated Neutron Log (Dual Porosity - CNT-G) Run # Date Run ~ 1/8/94 FINAL LOG: D_ual B_u, r_st TDT-P (~ 1/8/94 I o'~--o0- ~. D~2.0 1/17/94 "FINAL LOG: Perf Record 3 3/8 .... ~H, 6SPF"__ "FINAL LOG:V~erf Record 270' 3 3/8 .... 6 SPF" /~IS Tape:c~n~l ./C'N/ZDL_~k~: 7500-10564 w/lis verification -l& L~O,Ta~ FINAL LOG: V~ement Bond Log (CBT-GR) FINAL LOG: Cement Evaluation Log (CET-GR) Company Schlumberger Schlumberger Schlumberger (~ 1/16-17/94 Schlumberger qqsD .- loq, z,W 5 '' v"Compensated Neutron Log (Dual Porosity- CNT-G) 1/9/94 Atlas 't~ual Burst TDT-P Log 1/15/94 Schlumberger q~t,o - i t~ bq 5'~ 1/15/94 Schlumberger 1/11/94 Schlumberger l:k~cr- I'b~ ~" (~) 1/11/94 Schlumberger Please sign and return to: Elizabeth R. Barker,ARCO Alaska, Inc. ATO-415 P.O. Box 100360 Anchorage, ~aska 99510-0360 PLEASE SIGN ONE COPY AND RETURN Transmittal Number: 703 Page: 2 ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 24 February 1994 RE: Transmittal of Data ECC #: 6136.00 Data: CN/GR Dear Sir/Madam, Reference: BP R-35 (23-33-12-13) PRUDHOE BAY NORTH SLOPE, AK Enclosed, please find the data as described below: Tapes/Diskettes: Sent by U.S. MAIL c~pN/GR LDWG TAPE+LIST Run ~ 1 Please sign and return to: Atlas Wireline Services Petrophysical Services 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson Received by: Date: ARCO Alaska, Inc. Lisburne/Point McIntyre Engineering Date: December 2, 1993 Subject: Transmittal #367 From: To: ARCO Alaska Inc. Bob Crandall A~C 3001 Porcupine Drive Anchorage, AK 99501 The following Point McIntyre data are enclosed. This information is confidential and your cooperation in maintaining confidentiality is appreciated· · Well Log ~O-~.7 1 blueline 1 sepia I~ZO- 1~'7~L¢ ,5" ~ P1-01 Perforation Record 2-1/8'' BH ENERJET q5--.~5'~ P1-05 -'Static Pressure Survey ~PRESS/TEMP/GR/CCL) ...~ /PI~VL~ Vew'Enhanced Resistivity CDR .2 u · ?-7-~~~v'LWD True Vertical Depth CDR ~- t¢~ % 5 cml~ ~erforafion Record 3-%" HSD -4lB q~oo-to2.5o) $" 1 ~/Perforafion Record 3-%¢ HSD -4lB ~ooo-.-.105~o¢ ~" 1 ~'Data Frac Log fl'?0o -'lbZSO~ 5" 1 ¢Cement Evaluation Log (CET-GR) ~o-~v42.5, 5" 1 ,'Cement Bond Log (CBT-GR) ~oo-10~0o 5,' 1 ¢Cement Evaluation'Log (CET-GR) xl7z-qz~o~ ~. I IP1-17 IP1-17 P2-1 6 / ~P2-16 Run # Run Date Company 1 11/3-4/93 Schlum~r~ 1 ~z~0~ 93 Schlum~ 7/18-28~93 7A8-28/93 n/26/93 11129193 n/07/93 ~0/24/93 ~0/24/93 10/24/93 ,-~c~!P2-57 :::~P2-57 /P2-60 - 1P2-60 ,/Cement Bond Log (CBT-GR) ~llz-qz2~, s" 1 10/24/% ,, '--'- .... ..... ° / ~Compensated Neuron Log (2.5" CNT-D/~ '11/14/~3 ~Perfora~on Record (~/~ Gun 4lB ~) 1 11/14[.93 O-ISoo0, ~tadc Press~e S~ey ~SS/~~/GR/CCL)tgStl ~erforafion Record ~/~' 4lB ~ ~q~ ~m¢, 5"1 11/14/93 PLEASE SIGN ONE COPY AND RETURN Transmittal #367 (AOGCC) .. .... . Page 2 Well Tape/Diskette w/verification oft '~ 5qT"~t Run # Run Date Company PI~T#1 C__~~t~!)_Data in 2 ST Bit Runs (w/Orig. Well) 4~ ! 7/18/93_ Sddum,har~ P1-16 'Dual PropResis/Neu/Dens/GR-Depth Shifted°t* ~'~24~3/~9%~'%~/93 Bal~-I~ghes~5 ~ P1-21 Dual PropResis/Neu/Dens/GR-Depth Shifted~ 3z6 q%'/[5 P2-12 ~/P2-16 P2-16 P2-46 P2-46 Final MWD ~t vcb&k~. - DIFL/GR, CN/ZDL/GR (LDW~ Tape & Disk~kette) - , Final MWD DIFL/CN/ZDL/GR (LDWG Ta~e & Disk~tte) ,ct5 - k~k 5q2,?., c~q~$-q z~3' _ Final MWD 8/31/93 Schlumbeq~ 9/13/93 Atlas 9/11/93 Sd'dum~ 9/27/93 Atlas 9/26/93 Sd'duml:~m~ Please sign -~~~~ and return to: Laura S. Lahrson, ATO-409 ARCO Alaska, Inc. P.O. BOX 100360 Anchorage, Alaska 99510-0360 .. Transmittal #367 PLEASE SIGN ONE COPY AND RETURN INDIVIDUAL WELL GEOLOGICAL INVENTORY REPORT PERMIT DATA DETAIL 10/14/1993 PAGE: 1 93-087 CBT W/JWL 93-087 CET W/JWL 93-087 GCT 93-087 SBT/GR/CCL 93-087 407 93-087 DAILY WELL OP 93-087 SURVEY 93-087 SURVEY 93-087 SURVEY R1,5",12630-13663 R1,5",12630-13687 R1,35-13650 R1,5",12794-13690 COMP DATE:09/02/93 06/15/93-07/13/93 ANADRILL ANADRILL SS DIRECTIONAL SUMMARY Are well tests required? was well cored? Yes No Yes No If yes, was the core analysis & description received? Are dry ditch samples required? Yes No Yes No WELL IS IN COMPLIANCE. INITIAL COMMENTS: Date: Subject: From: ARCO Alaska, Inc. .... -~sburne/Point McIntyre Engmeerh~g November 17, 1993 Transmittal #361 ARCO Alaska Inc. To: Bob Crandall AOC~C 3001 Porcupine Drive Anchorage, AK 99501 Enclosed are sepias for the following Point McIntyre logs. These sepias were erroneously omitted from Transmittal #359, sent 10/13/93. This information is confidential and your cooperation in maintaining confidentiality is appreciated. Log Well Title Run # Run Date Company 1 sepia P1-04 Completion Record, Perforation HSD 6 s~p 33/8'' I 8/19/93 Schlumber§er t P1-05 /Perforating Record 3%" HSD 4lB HJ ti RDX I 8/23/93 Schlumberger P1-05 ,/'Perforating Record 33/8'' HSD 41B HI Ii RDX I 8/30/93. Schlumberger P1-05 v'Perforating-Record 3%8" HSD 41B HI II RDX I 8/31/93 Schlumberger 1-05 x/Perforating Record 3%"HSD 41B HI 11RDX I 9/01/93 Schlumberger 1-05 x/Perforating Record 3%8" HSD 41B HI II RDX I 9/02/93 Schlumberger P1-08 ,./Integrated Formation Log-MD - 7/19-24/93 Exlog P1-08 ,/Integrated Formation Log -TVD - 7/19-24/93 Exlog P1-08 ,/Engineering Parameters -MD - 7/19-24/93 Exlog P1-08 v'Pressure Data Log-MD - 7/19-24/93 Exlog ,/Pi-08STI' Integrated Formation Log -MD v'P1-GSST1 Integrated Formation Log-TVD v'PI-08ST1 Engineering Parameters-MD 7I'~I-~ST1 Pressure Data Log-MD · - 7125-31/93 .~ Exlog - 7125-31/93 Exlog - 7125-31/93 Exlog - 7125-31/93 Exlog Pl-13 ,/'Integrated Formation Log-MD Pl-13 v' Integrated Formation Log -TVD P1-13 ,/Engineering Parameters -MD P1-13 v'Pressure Data Log-MD' 6/1-11/93 Exlog 6/1-11/93 Exlog 6/1-11/93 Exlog 6/1-11/93 Exlog IPl-17 /integrated Formation Log -MD 0~_~\,~, [Pl-17 v/Integrated Formation Log-TVD /P1-17 v/ Engineering Parameters -MD |P1-17 ,/Pressure Data Log-MD - 4112-16/93 Exlog - 4112-16/93 Exlog - 4112-16/93 Exlog - 4/12-16/93 Exlog PLEASE SIGN ONE COPY AND RETURN Transmittal #361 (AOGCC) Log Well TiQe 1 sopia O~.)/~o~]P1-21 ,,/Inte~ated Formation Log-MD P1-21 V' .Integrated Formation Log -TVD P1-21 ¢Engineering Parameters -MD P1-21 ,/Pressure Data Log-MD P2-06 ~Z-Densilog/Cmpnstd NEUT~ON/GR/Caliper P2-06 x/Dual Laterolog/Gamma Ray/SP P2-06 ,/Sub-Sea Vertical Depth (Single Shot Data) P2-06 ,/Borehole Profile P2-16 P2-16 P2-16 P2-16 v'Z-Densilog/Cmpnstd NEUTRON/GR/Caliper 1 v/Dual Induction Focused Log/Gamma Ray 1 ,/Sub-Sea Vertical Depth (Multi Shot Data) 1 7'Borehole Profile I P2-46 ,/Z-Densilog/Cmpnstd NEUTRON/GR/Caliper 1 P2-46 v/Dual Induction Focused Log/Gamma Ray 1 P2-46 ,/Sub-Sea Vertical Depth (Directional Drlg Data) 1 P2-46 ~q3orehole Profile 1 Run # Run Date - 4/30-5/5/93 - 4/30-5/5/93 - 4/30-5/5/93 - 4/3O-5/5/93 8117/93 8117/93 8117/93 8117193 9/t3/93 9/t3/93 9113/93 9113193 9127193 9127/93 9127/93 9127193 Company Exlog Exlog Exlog Exlog Atlas Arias Atlas Atlas Atlas Atlas Atlas Atlas Arias Atlas Atlas Atlas Please sign /d~./~?flj.~/~ and return to: Laura S. Lahrson, ATO-409 ARCO Alaska, Inc. 'P.O: BOX 100360 ' Anchorage, Alaska 99510-0360 Transmittal #361 RECEIVED NOV 79 1993 ~Jaska Oil & (~as Cons. Commission Anchorage PLEASE SIGN ONE COPY AND RETURN Date: Subject: From: October 13~ 1993 Transmittal #359 ARCO Alaska Inc. .... ARCO Alaska, Inc .... ~ ~burne/Point Mclntyre Engineeri .. To: Bob Crandall AOC~C 3001 Porcupine Drive Anchorage, AK 99501 The following Point Mclntyre data are enclosed. This information is confidential and your cooperation in maintaining confidentiality is appreciated. Log Well Title ' Run # 'Run Date P1-04 .Completion Record, Perforation HSD 6 sfp 3,,%8" 1 8/19/93 x'.3 ~OTo-I~o~' -~ P1-05 Perforating Record 3%8" HSD 4lB H}' II RDX''~'', 1~z~'' 18/23/93 P1-05 Perforating Record 3%8" HSD 4lB I-~ II RDX-- ~' 1 ~ '] 8/30/93 P1-05 Perforating Record 3%8" HSD 4lB HJ II RDX-m°', le0t~'-~8/31/93 P1-05 Perforating .Record 3%8".HSD 4lB HJ II RDX" S"j 1~,.~9/01/93 P1-05 Perforating Record 3%8" HSD 41B,...~I-~i :z~-~ ~-1%~ ~t ~II RDX ?~ .~-'~__ 9/02/93 ~ - P1-08 Integrated Formation Lbg ~)Z ~mo- loo°~l~;z'~ 7/19-24/93 P1-08 Integrated Formation Log~ (~2~--B77;.~ - 7/19-24/93 P1-08 Pressure Data Log-MD I"~ ~ - ,~?~' - 7/19-24/93 Company Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Exlog Exlog t~ Exlog Exlog .08 PI438S~1' Integrated Formation Log ~-~'~ ~'/o-to'~e~' _ 7/25-31/93 PI-CBSt'I Integrated Formation Log ~2"~ ~O--~76o/ 7/25-31/93  Engineering Parameters 7~~"~ ~?~-. leqco' 7/25-31/93 Pressure Data Log-MD !'~ ~31P-~ .S?~5' - 7/25-31/93 Exlog Exlog Exlog Exlog IPI-13 Integrated Formation Log-~ 2", ~oo-lloo5 _ 6/1-11/93 Pl-13 Integrated Formation Log___'~ Y-"~ t~4o-w?q5 6/1-11/93 Parameters ]Pl-13 Engineering , - 6/1-11/93 IPl-13 Pressure Data Log-MD ~" co~ -- ~,-~o - 6/1-11/93 Exlog Exlog Exlog Exlog Pl-17 Integrated Formation Log 4~__ ?'i, 7~0o-Io~2. - 4/12-16/93 Pl-17 Integrated Formation Log -~).2 ~ 7~soO- ~2. 4/12-16/93 Pl-17 En~~g P~et~s ~ ~", 7~ ~~ 4/12-16/93 Pl-17 Press~e Data Log-MD ~" ~ o~o- ~Z~v - 4/12-16/93 Exlog Exlog Exlog Exlog PLEASE SIGN ONE COPY AND RETURN , ransmittal ft359 (AOGCC) -' Page 2 Log W'ell Title 1blue line P1-21 Integrated Formation Log ~~- P1-21 Integrated Formation Log P1-21 Engineering Parameters ~D - P1-04 P1-05 P1-05 P1-05 Run # Run Date Company 4/30-5/5/93 F_xlog ·- 4/30-5/5/93 4/30-5/5/93 Exlog P1-21 Pressure Data Log -MD'"' - 4/30-5/5/93 Exlog ~" ~:~ -- q~co' 'P2-06 Z-Densilog/Cmpnstd NEUTRON/GR/Caliper -~'> ~.~S"~ ll,4oc-. 8/17/93 Atlas .P2-06 Dual Laterolog/Gamma Ray/SP ' 1 8/17/93 Atlas 2-~S'~ P2-06 Sub-Sea Vertical Depth (Single Shot Data)--.x.1 8/17/93 Atlas iP2-06 Borehole Profile 1 8/17/93 Atlas ~5 I~-)-~' x tq0o-- ~ ~tq0o - h-t%~ ~ I0o7. 0r9/13/93~o~t,, Atlas P2-16 Z-Densilog/Cmpnstd NEUTRON/GR/Caliper/7~ ~.~ P2-16 Dual Induction Focused Log/Gamma Ray 1 9/13/93 Atlas P2-16 Sub-Sea Vertical Depth (Multi Shot Data) 1 9/13/93 Atlas P2-16 Borehole Profile 1 9/13/93 Atlas P2-46 Z-Densilog/Cmpnstd NEUTRON/GR/Caliper g~l' 9/27/93 Atlas P2-46 Dual Induction Focused Log/Gamma Ray 1 9/2~/93 Atlas P2-46 Sub-Sea Vertical Depth (Directional Drlg Data)~._"~1> 9/27/93 Atlas P2-46 Borehole Profile 1 9/27/93 Atlas I+~"~ Diskette/Tape (w/verification listing) Well Title Run # Run Date Company GCT diskette-Complete Calc. V' 1 7/28/93 Schlumberger GCT diskette-Complete Calc.v~ 1 8/_12/?_3 Schlumberger cr> /crm h, mt P1-08 ?'5..:7q IPl-13 ,; %- 5[ ] Pl-17 P2-06 c~5-t0~ P2-06 P2-06 CDN/CDR in 3 Bit Runs (O__H EdiO,/ ctq$~tt ~ ~f~19 mVD - CDR/GR'Only in 5 Bit Runs (OH Edit) P~lS/°qw"i~° Dual Prop Resis/Densitv/Neutron/GR w/listing 5-7 Final M-WD w/Listing + ~ - Final M'WD ~/Listing'r'cl~ - Final MWD w/Listing*~ - Final MWD w/Listing ~-~ d - CDN/CDR in 3 Bit Runs (O_~ Edit)~St[/%~--liqT/~, 5 1 DLL/CN/ZDL/GR in LDWG Format w/Listing 1 ~::~lq ott' t~qoo -tt '7 8(o 6/27/93 7/13/93 7/24/93 6/6/93 6/07/93 4/16/93 4/16/93 8/17/93 8/17/93 8/17/93 Schlumberger Schlumberger Schlumberger Baker Hughes Baker Hughes Baker Hughes Baker Hughes Baker Hughes Schlumberger Atlas PLEASE SIGN ONE COPY AND RETURN Transmittal #359 (AOGCC) Page 3 Report Well P1-04 P1-05 P1-08 Pl-13 PI-I~ Title Sub-Surface Directional Survey (2 copies)v/ Sub-Surface Directional Survey (2 copies) Final Well Report ~" Final Well Report Final Well Report,'" Final Well Reportw Date 7/28/93 8/12/93 7/19-8/1/93 6/1-11/93 4/12-16/93 4/30-5/5/93 Company Schlumberger Schlumberger Exlog Exlog Exlog Exlog Please and return to: 'Laura S. Lahrson, ATO-409 ARCO Alaska, Inc. P.O. BOX 100360 · Anchorage, Alaska 99510-0360 Please note: The Exlog blueline logs are located within the Final Well Report binders. Transmittal #359 PLEASE SIGN ONE COPY AND RETURN STATE OF ALASKA ALASKA L)iL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permil Number ARCO Alaska,/nc. 93-87~r,~,(~ 3. Address B. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 so- 029-22378 4. Location of well at surface ~ 9. Unit or Lease Name 1457'NSL, 695' WEL, SEC. 16, T12N, R14E i' i Point Mclntyre V~1~~_ . ~ P1_05 At Top Producing Interval i:'.i i'~r 10. Well Number 2209'NSL, 2445' WEL, SEC. 14, T12N, R14 ;~?I-~.~ 11. Field and Pool At Total Depth ~'"-~--'-- -~ ' Point Mclntyre 2242' NSL, 1758' WEL, SEC. 14, T12N, R14~ 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. KBE = 49. 7' ADL 34624 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, il ollshore 16. No. of Completions 6/14/93 7/7/93 9/2/93J N/A feet MSL One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 120. Depth where SSSV set 21. Thickness of Permafrost 13828'MD/9218' TVD 13725'MD/9159' TVD YES [] NO []I 2308' feet MD 1750'(Approx.) 22. Type Electric or Other Logs Run MWD 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 41' 121' 30" 280 cuft Arcticset(Approx.) 10-3/4" 45. 5# N T-80 41' 4236' 13-1/2" 2563 cuft "E"/406 cuft Class "G" 7-5/8" 29. 7# L-80/13CR 37' 13804' 9-7/8" 801 cuft Class "G" 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) Gun Diameter 3-3/8" 6 spf MD TVD (Subsea) 4-1/2" 128 76' 12808' 13056'- 13236' 8724'-8832' 13CR80 13272'-13572' 8854'-9024' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze protected wi60 bbls diesel 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lilt, etc.) Not on production N/A Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO TEST PERIOD ~ I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence ol oil, gas or water. Submit core chips. R'E E V[D O0T 1 1 ,.&iaska 0il .& Gas Cor~s. 6ommissio~ / nchorage Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. ~ 30. I( GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPlH TRUE VERT. DEPTH GOR, and time of each phase. Subsea HRZ 12890' 8610' Kalubik 12983' 8668' Kuparuk 13662' 9062' REC?EIVED OCT 11 1993 Alaska Oil & G as Cons. Commission 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Si9~~ t,. L - T itie Qcilling Engineer SuoelVisor Date 10 - r ( ~ 7 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24 : If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: P1-05 BOROUGH: NORTH SLOPE UNIT: POINT MCINTYRE FIELD: POINT MCINTYRE LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 06/14/93 07:00 SPUD: 06/15/93 03:00 RELEASE: OPERATION: DRLG RIG: POOL 7 WO/C RIG: POOL 7 06/15/93 (1) TD: 280'( 0) 06/16/93 (2) TD: 1725' (1445) DRLG. MW: 8.6 VIS:300 MOVE RIG. RIG ACCEPTED @ 19:00 HRS, 6/14/93. N/U DIVERTER. MIX SPUD MUD. TEST DIVERTER. P/U BHA #1. SPUD WELL @ 03:00 HRS, 6/15/93. DRLG F/ 56'-280'. DRLG. DRLG F/ 280'-544' MW: 9.0 VIS: 80 SHORT TRIP. CIRC. DRLG F/ 544'-1725'. 06/17/93 (3) TD: 4260' (2535) 06/18/93 (4) TD: 4260' ( 0) 06/19/93 ( 5) TD: 4883' ( 623) 06/20/93 (6) TD: 7303' (2420) 06/21/93 ( 7) TD: 7887' ( 584) 06/22/93 ( 8) TD: 8456' ( 569) 06/23/93 (9) TD: 9468' (1012) POH TO 3414' MW: 9.4 VIS: 0 DRLG TO 3022' CIRC POH TO 1700', RIH TO 3022', DRLD TO , , 4260', CIRC, POH TO 1000', RIH TO 4260', CIRC, POH TO 3414' RIGGED UP BOPE MW: 9.2 VIS: 0 POH, PLANNED MAINT. SERV CSG HANDLING EQUIP, RUN 10-3/4" CSG TO 4236', CMT W/460 BBLS LEAD CMT, 72 BBLS SLURRY, 400 BBL TAIL, SERV CSG HNDLG EQUIP, REPAIR WELLHEAD, CMT TOP JOB, NU BOPE DRLG. MW: 9.1 VIS: 38 M/U BOPE. TEST BOPE. RIH TO 4154'_ CIRC__ TEST CSG. DRLG CMT TO 4070' CIRC. FIT (14.8 PPG EMW) . DRLG TO 4883' POOH. MW: 9.5 VIS: 68 DRLG TO 5259' CIRC. SHORT TRIP. DRLG TO 6279' CIRC. SHORT TRIP. DRLG TO 7303' CIRC. SHORT TRIP. DRLG. SHORT TRIP. DRLG TO 7583' RIH. CIRC. DRLG TO 7887' MW: 9.5 VIS: 90 CIRC. POOH. CHANGE BIT. POH TO 4400' MW: 9.4 VIS: 0 DRLD TO 7994', CIRC, WASH & BACK REAM TO SHOE, BHA RUN #4, SERV TOP DRIVE, RIH TO 7656', DRILD TO 8456', CIRC, POH TO 4400' DRLG @ 9468' MW: 9.4 VIS: 0 BHA RUN #4, POH TO 150', BHA RUN #5, RIH TO 8456', WASH & REAM F/8200'-8456', DRLD TO 9468' WELL : P1-05 OPERATION: RIG : POOL 7 PAGE: 2 06/24/93 (10) TD: 9870' ( 402) 06/25/93 (11) TD:10856' ( 986) DRLG TO 9870' MW: 9.6 VIS: 52 BHA #5 DRILLED TO 9646', ROP DROPPED F/70' TO 40'/HR, DRILD & SURVEY F/9468'-9646', CIRC, BHA RUN # 6 RIH TO 9646', WASH & REAM 8460'-9646, DRLD TO 9870' DRILLING MW: 9.6 VIS: 54 DRLD TO 10412. RIH, REAM TO BTTM. DRLD TO 10856. 06/26/93 (12) TD:ll146' ( 290) 06/27/93 (13) TD:ll600' ( 454) 06/28/93 (14) TD:11655' ( 55) 06/29/93 (15) TD:11655' ( 0) 06/30/93 (16) TD:11655' ( 0) 07/01/93 (17) TD:11225' ( 0) 07/02/93 (18) TD:l1712' ( 487) 07/03/93 (19) TD:12300' ( 588) DRLG. DRLG TO 11081' 11146' MW: 9.6 VIS: 54 CIRC. POOH. CHANGE BHA. RIH. DRLG TO DRLG. DRLG TO 11551' 11600' MW: 9.7 VIS: 54 CIRC. POOH. CHANGE BIT. RIH. DRLG TO CIRC. MW: 9.7 VIS: 57 DRLG TO 11655'. STUCK PIPE. WORK PIPE. ATTEMPT TO ROTATE & CIRC. R/U ATLAS. RIH W/ SOS OVERSHOT. RIH W/ FREEPOINT. FREE @ 11416' RIH W/ STRING SHOT. BACKOFF. CIRC. R/D ATLAS. POOH. FISHING MW: 9.8 VIS: 0 POH W/E-LINE, CBU, POH, SERVICE WEAR RING, M/U FISHING TOOLS, RIH, CIRC & COND MUD, SCREW INTO FISH, JAR 2 LICKS UP & 30 MINS DOWN RIH TO LAY CMT PLUG MW: 9.9 VIS: 57 JAR ON STUCK PIPE @ 11413' PERFORM BLIND BACK OFF, R/U W/L , & RIH W/STRING SHOT, FIRE SHOT @ SCREW IN SUB, BACKED OFF, POH W/W/L, CIRC, POH, SERV TOP DRIVE, RIH TO LAY CMT PLUG W/5" DP DRLD CMT F/11168'-11183' MW:10.0 VIS: 65 RIH TO 6000' TO LAY CMT PLUG, CIRC @ 11413', PUMP 44 BBLS CMT, POH TO 10000', CIRC, POH, TEST BOPE, RIH W/BHA #11 TO SHOE, SERV TOP DRIVE, RIH TO 11168', WASH & REAM F/10559'-11168', DRLG TO 11225' BACK REAM F/11712'-11072' MW: 9.8 VIS: 68 DRLD TO 11712', CIRC, POH TO 1000', BACK REAM F/11712'-11072' NOTE:ACCUMULATED COST IS $2,450,598 DRLG. MW: 9.9 VIS: 70 PULL BHA. RIH. DRLG F/ 11712'-12300' RE EtVED & Gas Cons. Commissior~ Anchorage WELL · P1-05 OPERATION: RIG : POOL 7 PAGE: 3 07/04/93 (20) TD:12950' ( 650) 07/05/93 (21) TD:12980' ( 30) 07/06/93 (22) TD:13720' ( 740) DRLG. DRLG TO 12542' 12950' MW:10.1 VIS: 77 CIRC. SHORT TRIP TO 10800'. DRLG TO DRLG. MW:10.1 VIS: 61 DRLG TO 12950'. CIRC. POOH. M/U BHA. RIH. DRLG TO 12980' POOH. DRLG TO 13720'. CIRC. POOH. MW:10.2 VIS: 67 07/07/93 (23) TD:13825' ( 105) 07/08/93 (24) TD:13825' ( 0) 07/09/93 (25) TD:13825' ( 0) 07/10/93 (26) TD:13825 PB: 0 POH TO 12700' MW:10.2 VIS: 64 POH, BHA RUN # 14, RIH TO 13720', CUT DRLG LINE, SERV. TOP DRIVE, RIH TO 13720', DRLD TO 13825', TD, CIRC @ 13825', POH TO 12700' RIH TO 7350' MW:10.2 VIS: 78 POH TO 8397', RIH TO 12990', REAMED LAST 7 STDS TO BTM, REAMED TO 13825', CBU, POH TO 977', L/D BHA, RIH W/BHA #15 SERV DRILL FLOOR, RIH TO 7350' TO 2100', SERV DRLG EQUIP, NOTE: TOTAL COST $2,807M COND. MUD WHILE LOGGING MW:10.1 VIS: 64 RIH TO 12467', TOOK MWD SURVEY @ 13775'. COND MUD WHILE LOGGING RUB CSG. MW:10.2 WBM SURVEY. CIRC. SHORT TRIP TO 12890'. CIRC. POOH. L/D BHA. TEST BOPE. RIH W/ 7-5/8" CSG. 07/11/93 (27) TD:13825 PB:13724 RUN CBL. MW: 8.5 NaC1 RIH W/ 7-5/8" CSG. CIRC. RIH W/ CSG. CIRC. CMT CSG W/ 630 BBLS CMT. TEST BOPE. RIH W/ JB/GR. RUN CBL. 07/12/93 (28) TD:13825 PB:13724 07/13/93 (29) TD: 0' ( 0) RIN W/ 4-1/2" TBG. MW: 8.5 NaCl RUN CBL. TOC @ 13050'. CMT THRU PERF INTERVAL. RIH W/ 4-1/2" 13 CR TBG. NOTE: CUMM COST: $3,963,542 RIG RELEASED 18:00 7/12 MW: 0.0 VIS: 0 INSTALL SEAL ASSEM. N/D BOPE STACK, INSTALL TREE, PERFORM INTREGRITY TEST ON TBG, TEST ANNULUS TO 3500 PSI, RIG RELEASED 18:00 7/12/93 SIGNATURE: (drilling superintendent) DATE: Alaska Oil & Gas Cons. c¡~-'ð1 ~ ) / 1\ ,/" -" . . -'1 1\ ' --,/vlii ~ > . . ~ NJ. 1 .............1...1.111......1.............................. ....1...1 .......... j.IIUII.. '-~ .......... '8181111' ~8JI.t.IBRCI!R ~ 4--..11.... _"lIlIn ~.II""" 8..................1....1..1...'........................... . '.IHIIIU.. ~ IJORIIt '.IIII.nn j,~~ ~,'l!!m"".y.nJ~ '~.~WII£ ,:_~ ~n(Jt 1 -..rA:1IIn1E 1JrATI(If 2 "8J8A 1WH.iIC IEClI*TUII ~.O7 :iWE: '~ E.L tI.JIØ: ~ ~1I1L 1EAD 1.Œ'.ATI()f: tAT(MI-S> 'C.eo ,mPCE/-W) 0.'00 aIItIJ'ni ~ IIJTARY tABLE to Tt1I&ET IS 15.35 'TIE IN POIHTCUP) : '1Øt5lm JÐ>ni 0.00 11lŒ Vfm mPTH C.OO DnI*n~ C.OO AZIM'H 0.00 LATlTUDí(Hf-S) 0.00 J)1PMTtRE (E! -II) 0.00 RECiEIVED OCT 11 1993 l~c\'1 ~ Iii> ~:~ A f Ita AI ED ~I':..\ ~; [1 ;'<,0':.' ;:¡ \:,,:: ~14 F';~;i:1 ..' AIaskaOiJ& Gas Gons. Commissîon l't Ü .. ~ ~:~ \~ " is ~ ' Anchorage Date I /3 J ù I .,bE NJ. 2 P1-05/Jl ..IIIU.UIII ~ HII.1l1I11I1I( 9..R\IEY fAlDJAnCHi ....'.'.111.. ~ ItRC ~ tf.A9..m DmWAL 'ARTlCAL t~ snn() AZIIIITH UTITœE IfPMn.RE ÐI~ ~t AIDtJTH .us 1!f1H m7H særI~ ~. tV-S E/;I ~ ft ft ft ft *9 ~ ft ft ft de9 100ft ,to 0.00 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 > 242.10 242.1 242.10 0.39 0.20 107.50 ~.13 0.40 0.42 107.50 -0.08 331.40 89.3 331.40 0.61 0.10 103.20 ~.19 0.63 0.66 106.99 0.12 421.40 90.0 421.40 1.01 Ð.50 119.10 -0.40 1.05 1.12 110.94 0.45 505.00 83.6 504.99 2.12 1.20 108.50 -0.86' 2.20 2.36 Jll.29 O.as 599.10 '4.1 599.05 4.b3 2.20 112.90 -1.87 4.79 5.t5 111.32 1.07 :688 .10 89.0 lÞ87 .93 !.n 3.60 107.eo -3.39 9.03 ~.6-4 110.58 1.60 776.00 87.9 775.63 14.30 4.20 105.30 -5.08 14.76 15.61 109.00 0.71 &7.00 fl.0 866 . 33 21.28 5.00 99.~ -6.lIJ 21.89 22.86 J06.79 1.02 "'93O.oo -63.0 '929.10 2b.bO 4.90 '95.40 -1.00 ?J .28 28.24 t04.ge .Ð.56 1.022.00 '92.0 1020.~ 36.63 1.70 ;15 .70 -1.21 :37.34 ..03 tOO. 'J3 ,~.25 1114.00 92.0 1111.55 -SO. 07 9.10 ts.90 -ð.13 50.74 51.12 -'7.00 1.~ .-1!O6.00 f2.0 :1202.44 64.~ ~.10 ~.70 '~.SI 1164.'4 65.16 . ...67 :10 .45 ,.:I2M.OO 92.0 ~nn.!5 :f9.oo 9.10 :::Ð.1O ::.4!9 ')In .63 ?J.17 ~.'t;) .1.tO ':1389.60 . 91.6 '1383.27 --,s. 90 11.60 '19 .40 ...... .19 '.b.~ '96.65 ""92.48 2.10 :1431.20 fl.6~IC72t56 116.32 ~4.!O ~.10 -:-2.14,;at6.92 ".1U.'5 91.94 ~.22 .ß14.40 13.2,1162.13 -139.12 D.tO ~".~ ,r..B5 ;~!1 -440.%1 ..65 1.37 -WMJO ""'.3 ,~M .iiM.l1 ~~ .;1'83.10 ,¿t6 ,'J¡1M.!8 . .,;'1111.15 ~_.I) -1d6 'm4.69 .~.O JÐI5.t4 ,!tt1.tl ,,~~ "';~-" /é-'.U "..~ ,~~91.19 ".17 -æ.15 !tW.07 ~. 4 :3J'12.:" '!!1.'M .".16 "'e.. Y.46 '~22I..40 '221.61 'Ð.~ :S... 1929.66 82.6 U99.83 251.12 22.00 11.~ 12.66 150.9'2 251.~ 87.11 3.40 em.36 99.7 Im.04 :291.27 Z~ ~.t6 .:B.33 æ90.75 191.32 ;wI6.39 .2.01 2121.88 92.5 .&74.11 .-J31.75 -16.68 ~.TJ 23.14 ~.92 331.77 .85.'10 1.55 ~1!213.52 91.6~.4f2 'S73.!1 '11.15 I~.IO "&22 1172.15 .:J73.!2 :IS.66 :1.12 '~..1 92.9 ~.95 ~ló.76 '..13 .1.10 .13.18 '-415.42 41b.76 - 15.41 2.39 t399.02 '92.6 'I3U.11 '462.00 !9.13 <12.43 ~.62 ...e60.'31 <4&2.01 :85.08 '1.10 æ491.17 92.1 2197.52 "'.67 ~.Q «.14 :t5. 95 'S7.61 '~.69 ~.13 ..09 25ð4.&O 93.6 M75.35 361.6ð 14.94 1tJ.17 32.22 ~559.29 561.72 ".67 2.62 2676.81 92.0 J550. 82 ~14.)J 14.~ e.t! ':57 .!9 '11.67 '614.~ "'.65 Ð.& 2769.40 92.6 2625.26 669.33 38.11 &.70 '1.16 JJó6. 'S7 669.37 ~.16 3.66 2858.15 &.7 2693.09 726.52 42.19 83.39 66.17 723.~ 72b. 56 64.77 5.19 2!M.16 6.0 2697 .~ T¥J. 51 42.3ð !3.64 66.62 TlJ .56 7?IJ./IJ ð4.77 4f .15 2949.11 85.0 2759.37 7&.79 -44.20 13.72 13.04 7!5.46 1M.85 -14.69 2.15 »«.07 ~.O '2827.34 855. Oð 44.39 14.00 80.13 851.39 855.15 84.62 Ð.!8 3137.48 93.-4 2892.09 m.3ð 47.S3 86.12 85.89 118.4-4 922.45 &4.66 4.03 3229.68 92.2 .!95£. 50 m.02 50.~ &$.56 90.33 187 . 95 192.07 6-4.78 2.71 3323,59 93.9 0011. ~4 1065.12 51.93 es.6t 95.32 1060.88 1065.16 M.B7 1.90 3411.55 U.O ~5.19 1134.7~ 52.74 63.63 101.85 1130.20 1134 .7ð ð4 .85 2.01 ~.57 93.0 3121 .~2 12Oð.81 52.87 84.65 109.41 1203.91 l2Oð.87 64.81 O.M .3599 .44 94.9 3178.56 12&4.55 53.07 16.09 115.52 1Z79 .40 12&4.60 M.M 1.23 . ttJ'E t(J. 3 Pl-cr51 J7 HIIIIII.U" .~ ...unll..... QR.ÆY CI\LOJ.ATlæs .llIn U II II I CIRCtlJí< N1£ f£T1-œftHHfl I£ASI.m IHm'VAL tJÐ\TIrAL tAntli STATUti AWIJIH LATlnfi ~ ÐI~ &t mflmi .m.s 11Ð>1H m1H QIT1~ DI:1.Ji. JV-s E/-W ~ it ft ft it *9 4!q .oft ft ft '*9 tOOft ~ 3693.17 93.7 3234.al 1359.46 53.07 &.65 120. 2b 1354.17 1359.50 M.92 0.48 3786.05 92.9 3291.18 1433.32 52.30 83.94 126.31 1427.78 1433.36 t4.94 2.47 17'9.39 93.3 3348.03 1507.31 SL.M 83.22 134.59 1501.~ '1507.36 :.84 .88 0.72 3971.~ 92.0 3403.90 15ðO. 40 52.59 83.10 t43.3j 1573.96 15eO. 47 &4.80 0.13 4Oó5.22 93.8 3460.72 1654.99 52.8-4 64.20 151.55 't64B.12 1b55.oe 64.75 0.97 :4157 .42 92.2 3516.32 1728.S1 52.99 83.60 159 . '1l 1721.26 1728.62 -84.71 C).54 4190.7~ 33.3 3536.37 1755.12 53.06 M.6ð 162.08 1747.74 1J'55. 24 84.70 2.59 4260. B6 70.1 3578.70 1811.01 52.67 83.27 167.95 1803.33 1811.13 ~.68 1.70 43S3 . I:IJ 92.7 -3óJ.4 .72 18&4.89 53.00 85.86 V4.9SW6.e9 ms.02 &4.67 2.25 44W.9~ -94.33691.42 1960.~ 53.13 ,&.06 .110.26 1952.11 .1960.42 .....72 ,-Ð.23 4541.36 93.4 3147.29 ::8)35.16 :53.40 ~.~7 US.!9 ~.&O ::J!035.17 :14.77 ~.!9 -4629 .40 88.0 3199.73 :2105.& 53.48 17.28 .i89 .~ .2fffl.40 E05..94 14M 1.11 .CJ'22.UJ 93.2 wm.33 ~.eIO.62 $i.27 "16.'4 393.'17 . :s72.10 wuo.&e -44 .92 ~.16 'tt9.53 -16.9.813.44 :œ5I.lð ,A06 ;...41 ,¡-Tn.Y1 ,~~!5 .<'f8!L'!3 ,414.98 ..49 :'~3.83 94.3 -7110.171133.48 ~.Vl '8,7.!1 :~m :'''2124.16 ,t'~.52 "85.03 () .69 5i005.95 92.1 ~.87"~ ,'~164 : &1.18 .. _.04 -2'.117.17 t'I406.M .em. 04 -3.42 .~.5099.67 '93.718082.09 }881." '~.S1A5 ,~..,~J6,:8I1E.37 1.R1.83 ."."99 ..t ,12 :J1&15 89.1 :.4134.96 ~~'Ø5a.~ .~ . -CU1 ..tØJ4.-e18G IO.'~~ ,~~.95 ..19 '''',D2.tð fi.4 ,4191.11.;-..0 -~...so ,.;82AO '~'.._M ;:':88t09 ;;£...89 -:lt19 -'.$U6.19 ....O:.1lM7 .!O':21I3.'38 '34.13 ..12 -8N1J5'W92.15 'W03.49 "'.12 I.W 5470.13 93.9 01.83 V79.11 54.54 13.00 33.95.2768.23 Zl79.& 44.76 0.19 .5563,05 92.9 4355.99 ,~.15 -54.15 ..42 .1!Q.17 ~8ß.20 :1155.13 --'.12 ..~ 5657.59 94.5 ~11.34~.74 .54.1ð æ.eo ZJ2.G7 :.Ø19.!9 ,831.94 ~.6ð j).53 5150.93 93.3 4165.14 ,811M '14.'37 ..54 181A7~.53 -.cr M 84.64 ..0 5M1.~ W.7 ,~.tó :810.17 '53.90 "..19 1!9.11 ~S67.47 t081.13 ".60 ..15 "5934.00 92.4 4573.13 :J!55.!4 53.42 S?. 97 '299 .04~.1.14 'Sm.'" -84.56 æ.~ ,~.10 iN. 7 't629 .9ð.:mt.t4 ":53.10 C. -49 ..M 'SlU.'1 ~.68 c,-..5'2 :C).~ 6121.90 93.2 ,4685.22 ß\6.32 :5'3.60 ,~.91 .;J1I.!2 ~e1.16 ;1306.71 c44.'4ð G.'!I 6214.5ð ~.7 4740.65 3380.53 2.94 12.78 ro .47 -S365.06 .øo.~ ".44 0.12 6rJ7.'/9 93.4 V97 .33 3454.66 52.36 t1.27 337 .77 :8438.59 am.14 84.39 1.42 6400 . M 92.e 4853.40 352ð.47 53.29 82.71 34S.07 3511.!1 3m. 02 M.~ 1.59 ~94.ð1 t4.0 -4909.01 3604.20 54.19 t2.63 357.74 35ð7 .00 360-4.80 M.~ 0.9b ~.83 94.0 .9~.24 3680.23 .53.85 æ.9ó .166.62..3662.56 -3680 . a7 14.28 1.20 66el,l? 92.3 5018,17 3754.73 ~.76 83.83 374.54 3736.66 3755.39 &4.28 0.15 6775.34 ~4.2 5074.7~ 38)),43 53.31 83.59 182.84 3&U.94 1531.12 14.26 Ð.52 ~7C.03 94.7 5130.58 3906.U 54.40 ~.a7 390 .52 3Mð.02 3907.58 M.26 1.59 691:J.97 93.9 51e5.40 3983.17 ~.20 ~.95 m .'l9 39601 .01 39ß3 . ~7 ð4 ,28 0,22 7056.80 92.ð 523'i.Sl 405ð. 60 54.48 8S.æ 403.70 >4039.16 4059.29 64.29 0.43 7145.77 89.0 5291.07 4131.10 54.69 85.46 -409 . 54 4111.43 ~131.7ð 84.31 0.27 7232.36 16.6 ~1.50 '4201.49 54.07 es.!1 414.90 41181.62 4202.15 64.33 0.78 .'fŒ I(). 4 Pl-05/J7 ~fl.lllfll'.. ~ .'...'11."..' 9ß'EY tW.DIAn{)tS -HII.IIIIIII. tIRa1.AR ti£ ~ ff'.A9.m ~ WMlrAL tNQ"T SfATJ() jzDI fH JATßWE.IfPNm.RE ÐI~ at AZDtmi JLS IB=1ti 'W'ni 5ŒTI£I' .DIlH. W-S EI~ Get¥ ft ft ft ft ~ éeq ft it ft 4Ieq 100ft ,ß 732J .45 -r.i.1 'SYfl.26 4278.~ 5-t.12 ~.7~ 421.j5 425ð, 3B 4279.17 84.35 0.91 . 7419.7ð 92.3 ~1.16 «3S3.V 54.44 !5.32 127.74 4333.06 <C354 .12 14.36 0.62 75fJ7.34 D.b ~1.97 4424.7ð 54.61 85.11 -C33.69~.12 ~.42 84.38 0.27 m1.!S M.5 !550.77 4493.78 54.es es.24 439 .50 WZ.ð7 449~.41 34.39 0.31 7618,38 26.5 5S66. ~ 4515.4ð 54.89 as.lð 4U .31 - ~4.50 4516.11 &4.39 Ð.24 7711.50 93.1 5619.75 4591.54 54.65 85.95 447 .19 60.33 4592 .15 &4.41 0.72 7804.9S 93.4 5673.&6 ~.73 54.59 85.71 -452 .73-4646.32 -466ð. 32 8-4.43 0.22 7898.75 93.8 572S.4ð 4143.99 54.20 85.95 45&.28 ~Z2.3S 4744.57 ð4.46 0.46 m2.67 93.9 5783.04 4a2O.42 54.75 16.~ ..463.62,.4798.63 -4820. 9S 64..48 0.60 tOðO.98 &.3 S834.Oð -4892.50 S4M as. 40 .Ma.99 A&10.51 ~.03 -- ''''.50 ,~.6() ~173.02 '92.0 iJð87,!4 '.4967.62 54.79 '-16.33 .ot74.40~.i4 -4968.14 M.52 Ð.M !2b6.37 "t3.4 39-40.73 30«.10 ~.)J Iil. 'l9 .474.66 .alJ.83 '5044.59 .6C .56 1.01 &b6.2e '1. ~ ,1970.11 1IDI6.73 ~.23 ,..09 _31 ~.45 '"SM7 .18 '~.5ð 1.26 ,~43 S' .1 ,,891.1O..sw.;13 ':54.&1 ...16 ~æ~ 35117.56 ,~.60 ...1.13 -'~'99 ..6 .~.1O-Stf1.'D -'14.10 86.52 ..W'~..98 ~197.66 84.64 1.~ .:8549.36 :'is... ,.6104.M .5274.49 54.97 ~,!5 ".15 3252.Ð9 .-SO 4.86 .at.67 :Ð.!! . MG.10 ;93.7 tiIWO.12eÐ.lõ "",.sa.66 ~;:~.15 ",c8;51!,8JZ1 A9 't1S35O.50 ".11 "'..51 "-.rJ] .11 '...Ð .-u.~ .~.Jt ,'~.57 ':a5M ?<{a8L12 4W82J-4 ~.65 ....13 ,.1.13 '83JM ',"'.oæI.U _.12 ('S.. .-..15 ',8IAÓ ,:8WlI3 '15499.92 ..75 '.:..16 2\8922.89 '~.'8 ,,-&DO.!9''''11 ~3Z.64 ::86.-15 _.'I4'~.?J '52.50 14.77 :O.ð2 W17.04 '4.2 Q87.56 .5646.94 52.43 .e6. 43 513. U3623.M 1W.21 14.19 Ø.Zl 9110.73 93.7M44.195n1.10 :52.27 -6>.62 .117M"'5IRl.fR -"5'21.'95 14.81 "'0.23 '206.83 '6.1 ,6503.1357V7.46 52.98 -'4.74 S23.C3 :3174.03 'S197.7J -e4.82 t.n Ð'>1.97 '15.1 .:Ø6C),45 :5873.39 -:52.'92 ~.S3 S30.33...,.65 '~.65 ~.82 0.09 9395.37 \f3A "4617.13 ~.17 'J2. 04 IS.'. '~143"1923.48 r"5947 .72 84.83 1.12 ~.29 to.9 4Ð'3.Z4819.08 "l.W e.74 "'1.15 ~4.89 "19,32 I4.M ~.16 'f544.05 37 .! ~t87 ..a.64.62 -32.!1 44.94 '545.45 ;8fO.!9 .....& '14.84 t.'22 ''9579.73 35.7 VSJ.79¥112 .73 .51."'-; "'.48 Ma.H ..068.33 ,..ø3.02 ....~ J.18 9682.'" t02.8 6793.84 ,~TJ.93 ~.33 ".27 ~.OO ,'l49.t)9 6174.18 t4.!3 0.37 977S.53 93.0 ~.9ó 6247.35 51.92 64.65 563.09 6222.18 6247.60 84.83 0.55 f868.4O 92.9 ~9Oð. 4ð 6320. is 51.~ 84.51 569 .98 6'l94.76 6320.51 64.83 0.42 99OB.~ -40.2 b933.~ ô3S1.M 52 .16 ð3.4B 573.28 ~.19 6352.11 ð4.a2 2.54 1961.66 53.1 6965.61 ~.93 52.85 &4.15 SJ7 482 .Q6ð.05 6394.21 64.82 1.65 10054.66 ~.O 7021.~6 ,6467.92 52.57 64.79 5ð4.9S 6441.70 646! .20 M.a! 0.63 1014ð.51 93.9 7078.06 ðC3.H 54.01 16.7~ 59'0.49 6516.72 ~t42 ð4.!2 2/0 t0243.Oð 94.6 7134.29 ~19.14 53.01 p;Jf~ 594.40 6592.65 ~19.39 ð4.a5 1.19 1om.S! es.~ 7185.83 ~.24 52.77 e7.26 597.59 6660.71 U¿7.47 ð-4 . ß7 O.~ 10429 .26 100.7 7245.67 676ð.21 54.35 U.19 600.80 6741.69 6768,41 ð4.91 1.73 10525.56 96.3 nJ2.56 6M5.77 53.24 t9.26 ~.53 ~1~.37 ~.9~ &4.95 1.46 10617.iIJ 92.0 ræ;¡ .63e19.29 S3.2ó 90.39 1IJ2.1ó 4893.12 6919.42 85.00 0.98 .HGE NJ. 5 ; PI-Ð5/J? .nun...... ~ tllu....uun aR'ÆY tAID.1ATI~ ..II.IIII.W.. CIRClIJi{ ARC ~ tŒÆUŒD IHm<VAL vmTlCAL T~ STAn~ AZlftJ'rH 1ATItlÐE ~ DI~ it AZlttnr! JH.5 Dn>ni mYTH sæTI~ DIJjf. W-5 E/-W åe9I ft ft ft ft tIeg 1Ieg it ft it *9 100ft ~ 10710.~ 92.7 7411.5ð 6994.47 55.59 89.56 602.80 69U.~ 6994.56 85 .06 2.62 ~ 10804.42 94.1 7464.95 7071.73 3S.~ e9.73 .603.29 7046.02 7071.80 85.11 0.35 10098.47 94.1 7S18.78 7148.65 54.&! 89.36 603.90 7123.14 1148.69 85.15 ~.55 10942.71 ~.2 75«.26 71~.72 54.77 89.41 ~ 2ß 7159.~ l1M.7S 85.1ð 0.26 11084.96 142.2 1626.'ZS 7300.74 54.85 !B.3B .606.53 '7275.52 Tm.7S 85.23 0.59 11182.37 97.4 7682.50 73ð0.16 54.61 88.H 6Oe.94 1355.01 13&0.17 85.27 0.32 11275.98 93.6 1736.97 1456.21 54.22 -&.07 611.4S 7431.10 766:12 85.~ 0.42 11370.43 ~4.4 7792.3ð 7532.61 53.93 &.05 614.~ 7507.54 1532.61 e5.32 0.31 11464.56 94.1 7648.26 76œ.'lJ 53.Z3 &.13 616.57 1583.25 7bœ:ll 85.35 0.75 ,.......11111 .......II.IIKIIK Q'j-b1 rr: ~ ~r\ ~fILMED i :', ."\',1 ~ ..:.. ,'. ' . :~~.; ~:....: n li t.' "j ; ~\ i u ; ¡\ l /\ L ,~~~.{;\'V. \i'1 n')+p ¡J3JðJ Pfí;E t£. 1 **1...11.....11......1..1111..........11111......111.1..... 1I1III1I1 1.1.....11 'i 81111111. ,~lJ. ,...IIIUn ,...111.1. ~ 8111...... ..111..1. ..II.I.'.~ ~....'.III.I.I..'IIII'.I....'II".II'.I'.I.I.IIIIII........ ".IHIUI"I ~~._~ PIIIRM ..lIllInu ';1DWIHY "~JllUHEIAY.1RIU..OC ~?au. ME ?1 ~/J1 \T 81 1.Œm~ 1 4fØIMf 1k:tNT"tRE 1OCATI~2 -AIJtSlA MH.iIC DECLlHATI~ ~.O7 lATE: 22-U-93 8LL~ ~ rYEU. tØD LOCATUlh LATUV-S) ~.OO JtP<EI-W) 0.00 IilDlmi fIR(J( tmM'í DBLE TO ~ IS 85.35 tIE 1M fOIKT(TIf') : ~ ~ 0.00 TRUE IM:T ÐfPTH 0.00 IHCLlMATI~ 0.00 AZIMH 0 100 LATlTUDE(Hf-S) 0.00 ~(EI-W) 0.00 RE~E\\JED OCT 1 ì 1993 . C mffiiSS\O'0 Alaska Oil & Gas Cons. 0 Anchorage f>~ MJ. 2 P1-05/Jl 51 11 nUUlllUU ~~ IIUlllnnn. SRJEY tALa.lATICH3 IIKKkt.lllkl. CIRCULAR ARC ~ !£AStRED IHTfíNAL m'TlCAL Tti<G£T 'STAnœ mtlITH LATITUDE)fr'Nm..RE DIS?lAC9ÐIT it ~IItJTH ÐLS IfJ1H IfYni 5æTICtI ~. H/-S EI-W '~ " ft it ft ft 1IPg deç ft ft ft deç 100ft > 0.00 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 242.10 242.1 2e. 10 0.39 Ð.20 1~7.50 -0.13 0.40 0.42 107.50 0.08 331. ~ 89.3 331.40 0.61 0.10 103.20 -0.19 0.63 0.66 106.99 0.12 ~21.40 90.0 421.40 1.01 0.50 119.10 -o.~. 1.05 1.12 110.94 0.45 505.00 ð3.6 ~.9'9 2.12 1.20 106.50 -0.86 2.20 2.36 111.29 O.as 599.10 94.1 599.05 ..63 2.20 112.90 -1.87 4.79 5.15 111.32 1.07 1&.10 89.0 W.93 8.12 3.60 107 .~ -3.39 9.03 9.6-4 110.58 1.60 776.00 87.9 775.63 14.30 4.20 tOS.3j -5.00 14.76 15.61 109.00 0.71 667.00 91.0 &6.33 21.2ð 5.00 99.æ -h.6lJ , -21.89 22.M 106.79 1.02 B.OO :63.0 129 .10 -~.60 ~.90 ~.40 --7 ~ . ,"'.'26 ..24 l04.~ .0.56 1022.00 92.0 1020.~ 36.63 7.70 85.70 -].21 37.34 ~.03 100.93 3.25 1114.00 92.0 1111.~ SO .07 '.10 "85. to ",",.!3 '50.14 '1.12 "7.00 1.'52 .1206.00 92.0 no2.44 -4A.~ -1.70 ,a~JO .~t'SO ---eM.'4 åS.t6 -94.67 .~.45 1298.00 ~.O U9'3.25 79'.00 '.10 .:C7 .10 - ,...,.. ~ :,".63 79.17 'f3.)j t.10 1389.60 91.6 1383.27 415.90 11.60 19.40 -4.19 tb.56 96.65 ~.4ß 2.10 &431.20 tl.6 J47Z.56 ~116.32 t4.20 '183.10 -2.14 .116.92 116.415 '1.34 .3.22 :1574.40 '~.2 :1562.13 '139.82 ~15. to ~" .50 " 1).85 ,.40.21 140.21 'fi.65 ,J."37 .uM.70 .0.3 ,:;'I6f9M ,MÞ4.11 ,.;16.10 .;113.).? ~.46 , !1.64.-æ 164.15 ..45 :J..1J6 "1154.69 --90 .01735.54 191.01 "tð.60 ~.26 7.11 !91.06 191.19 W.17 '2.15 1&47 .07 iJ'2.4 1822.77 221.44 19.86 85.M .A6 !21.40 221.61 17.55 1.38 1929.66 .82.6 1399.83 251.12 22.~ t1.95 12.66 .1SO. 92 251.24 Ð.l1 B.40 2029.36 99.7 1991.04 !9l .27 25.~ 81.86 18.33 290.15 291.32 &.39 3.01 21Z1.88 '92.5 2074.!1 331.15 b).6ð 12.77 ~.1~ 'D.92 331.77 ,115.90 '1.-55 2213.52 'tl.6 ~.92 'S73.!1 27.15 ,"-.80 21.22 '3l2. 15 373.!2 '15.66 1.12 2)J¿.41 92.9 -2Z37.~ 416.76 !ß.83 11.10 33.3e 415.42 41b.7ó e5.41 2.39 l39'9.02 92.6 zm.71 <162.00 'Rj.1ð 82.43 ..62 ~.31 1162.01 ,as.tIe 1.10 2491.17 92.1 YJ97 .52 .509.67 32.62 62.~ -45. f5 ~7 .61 309.69 :t4. 83 8.09 25ð-4.80 93.6 P475.35 561.6ð 34.94 83.77 ~.22 '559. 2'9 561.ìi ,f4. 67 2.62 2b7b.81 92.0 2550.12 614.XJ 34.84 as .1ð Sl.29 611.67 614.35 64.65 O.M 2769.40 92.6 2625.26 669.33 38.11 M.70 61.16 UIJ.57 6/;9.37 &4.76 3.66 2!58. 15 68.7 2693.09 nó.52 42.19 43.39 U.17 723.~ 726.56 ~.77 5.19 2U4.16 6.0 2697 .~ T¥J .57 42.38 -83.M 66.62 727 .56 T¥J . fIJ ð4.77 4.15 2949.11 85.0 1J59.~ 788.19 44.!O 83.71 13.~ 785.46 7M.8S ~.69 2.15 ~.O7 95.0 2827 .34 855 . OB 44.39 84.00 6:).13 851.39 8S5 .15 ð4.62 0.28 3137 .46 93.~ 2892.09 922.38 47.83 &.12 15.89 f1ð.44 m.45 ð4.6b 4.03 :m9.M ~.2 2'152.50 99'2.02 so.)) M.~~ 90.33 9!7 .9S 992.07 84.78 2.71 3323.59 93.S ):)11.44 1065.12 51. 93 85.é2 95.32 l060.M 1o¿5.16 ð4.B7 1.90 3411.55 M.O 3:165.19 1134.7~ 52.7-4 83.63 101.85 1130.20 1134 .7ð &4.BS 2.01 3504 .57 93.0 3121.42 12OB.81 52.87 t4 . ~5 109.~1 1203.91 l2Oð.a7 ~.ðl 0.88 3599.~ 94.9 317ð.56 1284.55 53.07 &.09 115.52 1279.40 1234.60 84.6-4 1.23 f'AGE þ(J. 3 f1-05/I.T7 Sf .1 1111111111111 ~ILL 111..11111111. StJmY CALWA7IOO ..UUllnIU ClRO..IJIR N<C ~ ftFASæED Dmi:VAL VBmCAL tMGli STATl~ AZIPUrH lATrttm ~ ÐISP~ it AZI"'-!n1 BLS wrTH W1H m'THIt ~. -M/-5 EI-W œw " ft ft ft ft deg dPq ft ft ft ~ 100ft > 3693 .17 93.7 3234.87 1359.46 53.07 &6.65 120.26 1354.17 1359.50 84.92 0.48 3786.05 92.9 3291.18 1433.32 52.30 83.~4 126.31 1427.7ð 1433.36 &4.9~ 2.47 3m.39 93.3 ~.03 1507.31 52.66 83.22 134.59 1501.34 1507.36 84.M 0.72 3971.42 92.0 3403.90 15ðO." 52.59 A3.10 143.30' 1573.96 1580.47 M.80 0.13 +:-65.22 93.8 ~.n 1654.99 52.~ &4.20 151.55 1648.12 1655.08 84.75 0.97 ~157 .42 92.2 3516.32 1728.51 52.99 A3.60 159.37 1721.26 1728.62 M.71 0.54 4190.74 33.3 3536.37 1755.12 53.06 ð4.~ 162.M 1747.74 17SS.2~ 34.70 2.59 .c260.M 70.1 3S7ð.70 U11.01 52.67 !3.27 167.95 1803.33 1811.13 M.6ß 1.70 .cJ53.6f.J f2.7 ió34.72 taM. 89 53.00 85.M 174. 9S W6.89 1MS.02 -14 .67 2.25 ;*4] .94 ~4.3' ~4J1.C2-:t960.~ . 53.13 &.06 ~.!6 - '1m.l1 t9ó0.42 44.72 (». Z3 ~1.36 93.4 3747.?f 2035.16 53.40 &.07 185.39 2026.80 2035.27 84.77 0.29 :tI629 . 40 1&.0 'Z!99.73 -:.1105.&6 -53.48 17.28 tU9.~ 'Wfl.40 2105.94 £4.&4 1.11 '4722.60 93.23!55.33 '),I!180.62 . 53.27 "tb.94 m.v 2172.10 :2180.68 ,".92 0.36 '.19.53 96.Ç '':s913.44 ,~.lð . 33.06 0:86.'41 197.17 ~!M9.55 ':mð.'23 ~M.~ .o.~ 4913.a3 94.3 '9970.17 2333.48 52.97 87 .21 201.97 2324.76 2333.52 85.03 ~.69 500S.4J5 fl.1 '4025.87 "~2406.84 52.64 :83.28 108.~ r:1I7.J7 2406..M '«).04 3.42 ~.67 -4f3.7 ~.09::øl.19 53.65 c1l3.67 :t16.56:'2472.37 -'.Ml;83 \:,14 .'99 1.12 '~51M.7S 19.1 ,-CM,t6 :;'B1.44 :53.54 >,13.37 ~:P24.65 :~.jO ~æi53.50 "'.95 G.19 "'5282.1ð '93.4 4191.17:81&.10 -~.50 '1S2.40 233.8ðS17M .521.09 ~:~.'89 1.39 Si76.19 ~...O4247.!O ''WÐ3.~ .54.33 ~.12 !44.05 -869'2.45 V03.~ "'64.12 1.97 1470.13 93.9 ,01.83 zm.7l 54.54 :a3. 00 253.4]5 276ð.23 7779.&6 ,e4.76 0.79 55tJ.05 92.9 -4355. ~ 2855.15 54.15 13.42 262. ð7 1643.20 2855.33 ~.72 0.56 56S7.59 '''.5 :.4411.34 c!931.14 S4.1ð '12.80 1l2.fJ7 <1t19.19 :m1 t9~ :"'.6e .o.~ 5750.~ '93.3 ..~.~ .WJ07 .46 54.37 ~.5A !a1.O? -pm.53 1K)07.69 '84.64 OJ;! ~1.5ð 90.7 -451&.96 3)80.87 53. iJO t2.79 289.81 '¥)6] . 47 X1el.13 't4.6lJ 0.85 5934.00 92.4 4573.73 ~55.24 ~.C2 -12.W !99.04 .J141.34 3155.504 64.56 Ð.55 11fm.70 ~4.7 4ó29.,ð 3ZU.34 53.70 12.49 ~.6ð 3216.91 3l31.68 ð4.52 O.~ 6121 .90 93.2 4b85. 22 ~.32 53.60 12.91 318.22 "3291.36 0)6.11 ~.48 0.37 A21~.5ð 92.7 4740.65 33&0.53 '52.94 82.7! W.47 3365.06 33eO. 95 ~.~ 0.72 63fJ 7 . f'{1 93.4 4797.33 364.66 52.36 81.V 337 .77 3438.59 3455.H 64.39 1.42 6400.80 92.8 4853.40 3528 . 47 53.29 82.71 34ð.07 3511.81 3529 .02 &4.34 1.59 ~94.e1 94.0 4909.01 3604.20 ~.19 82.63 ~.74 .35a7. 00 3604.80 ð4.)J 0.96 ~.&3 94.0 4964.'24 J680. 23 '53.85 83.96 3ôb.62 3662.56 36ðO .87 ~.28 1.20 6bð1.17 92.3 5018.77 ~.73 53.76 13.e3 374.5-4 ~.6ò 3755.39 M.!8 0.15 D75.3-4 94.2 5074.74 3830.43 53.31 53.59 382.&4 3ðll.94 ~1.12 &4.26 0.52 6870.03 9~.7 Sl~.5B 3906. M 54.40 ð4.ei 390.52 3M8.02 3907.58 M.26 1.59 6'163.97 93.9 51a5.40 3983.17 ~.20 ~.95 'Ji7 .?i 3964 .01 3983.al M.2B 0.22 70Sò.M 92.8 5239.51 -i058.60 ~.4ð ð5.:1J ~3t70 4039.16 ~'1.lS' M.lS' 0.43 1145.77 89.0 5291.07 "131.10 ~.69 !5.46 ~.~ -4111.43 ~131 .7ð &4.31 O,V 7232.36 &.6 5341.50 4201.49 S4.Ð7 as.el 414.90 ~lM.62 4202.15 64.33 0.7ð 'i PAGE KI. ~ f1-fJ5IJ"! 51 11 IIIIIIU..... ~IU. ..uunnll.. ~ CALalATICRJ IIUIIIIIII:.. ClRCt.J1Æ Af« ~ ~ ~ VOOlCAL tARGET STATICI~ AZDtJTH LATrruDE ~ DI~ ¡t ÞJ.IM'H ÐLS S1H m1'H mTI~ IKlH. tV-s EI-W degI ,ß ft ft ft it deq d€og ft ft ft ~ 100ft > 7'm.~5 95.1 5397.26 4278.52 5-4.12 ~.7~ 421.25 425ð. 38 4279.17 ð-4.35 0.91 7~19.7ð 92.3 5451.16 .c353.47 ~.4-4 85.32 427.7~ -4333.06 4354.12 84.36 0.62 7507.~ 87.t:. ~1.97 4424.7ð 54.61 ð5 .11 433,69 ~.12 4425.42 ð-4.38 0.27 7591.as M,5 5550 .77 4493.7ð 54.es 85.24 439.50 'W2.a7 -4494.41 &4.39 0.31 761ß.38 26.5 5566.04 ~15.4ð 504.89 ð5.1ð 441.31 .w4.50 4516.11 6-4.39 0.2" 7711.50 93.1 5619.75 4591.5-4 ~,65 85,9S ~7,19 4570.33 4592.15 &4.41 0.72 7ð04.9S 93.4 5673.86 46Iil.73 ~.59 85.71 452.73 -4b4ó. 32 ~,32 &4.43 0.22 7898.75 93.8 5728 . 4ð 4743.99 54.20 85.95 45ð. 28 47Z2.3ð 4744.'57 ~.4ô 0.46 7992.67 93.9 5783.04 ,~.4Z 54.75 &.~ ~.62 "-4798.63 4820.98 ~.48 0.60 '8OeO.98 :&.3 ~.Oð ,.~.~ ':54.64 85.40 W.W :"'D.~1 '4Ia93. 03 ~-84.5O 0.60 ð173.02 92.0 Sð87.24 4967.62 ~.79 &.33 -474.40 ~4S.~ 19M. 14 !4.52 O~M -1266.37 ~.4 ~40.13'5044.10 :55~ Ð."l1 473.66 5021 .83 .:5044.~ 84.56 1.01 831ð.lð 51.~ 5970.31 5066.73 ~.23 ..09 .'480/11 ~~t45 '.~.1ð ~.5ð 1.26 8355.43 37 .1 ~1.60 ,5117.'13 '54.81 :&.16 '.1.~ ; "4.& ~117.56 "'.60 1.13 8453.99 98.6 ~.90 5197.27 ~.10 &.52 ~.09 SV4.98 5197.6f:. ð4.M 1.53 1S49.36 95.4 :4104.14 .5274.49 54.07 t6.~ ,-489.55 "-S252.09 "12l4,ab .:J4.67 0.28 :t643. to 'f3.7~160.12 SJ5O.t6 :53.66 :87.15 493.51' 'VO HI c~.50 ,-14.71 ,0.51 1737.11 "9. . 0 Q16.~ S0.34 "~.57 «i.eo c:f9a.-12 .>5102.14 .~sm.65 '..e4. 73 '1.63 M31.œ 9..0 W4.10 ~.62 Sl.~ 16.~ 103.40 W6.13 ~5499. 92 14.15 D.76 8922.89 '1.8 .cm.?? '5572.21 -52.64 &.15 '5Oð.'" I549.V 5572.50 f4.77 0.82 9017.04 ~4.2 GJA7 .56 5646. ~4 52.43 -i6.43 513.17 5623.~ 5647 .21 :&4.79 0.32 9110.73 ~.7 ~.79 '5121.10 52.Z7 &.62 SV.6ð 5697.89 5n1.~ 84.&1 0.23 9206.33 96.1 6503.13 5197 .46 52.~ .&4.74 523.43 $'74.03 "Srn~71 -&4.!2 1.72 Ð)1.W 95.1 6560.45 J873.!9 ~.92 ".!3 'SJO. 33 "1&49.65 -w3.65 84.82 e.09 9395.37 iJ3.4 &17 .33 5W.47 52.04 1S.7~ S36.43 5923.4ð 5947 .72 a.4.S3 1.22 fj4U.29 W.9 ~.35 e19.oe 51.90 185.1. 541.75 ~4.89 ~19.3'2 ~.&4 0.16 ~.OS 57.! OOð. 87 ~.62 52.21 ".9~ 545.45 ,4ð40.~ ~.86 ".84 1.22 9579 . 73 ~.7 ~.79 6092.18 51.99 M.~ 54ð.04 ~.33 6093,02 ".&4 1.18 ~M2. 50 102.e C93.~ ¿V3.93 52.33 ~.27 556.00 6149.09 -'174.18 64.83 0.37 ~T75. 53 93.0 6a5O.96 6247 .3S 51.92 ð4.65 563.09 6222.18 ó247.bO ð4.e3 0.55 986B.40 92.9 6906.48 6320 .25 51.~ ð4.~1 569.98 6?i4.76 6320.51 ~.83 0.42 WOð.5ð -tj.2 6933.)) ~1.84 52.16 83.~ 573.28 6326.19 6352.11 84.82 2.54 t961./,6 53.1 6965.61 6393,93 52.85 84.15 m.81 ~.05 6394.21 M.82 1.65 l~.M 93.0 7021.96 <646J .92 52 /)7 8-4 .79 5M, CJS ~1.70 64ó8 .20 14,81 0.63 10148.51 93.9 7076.06 ~.14 54.01 &.7~ 590.49 ~ló.n 6S43.42 64.82 2:0 10243.œ 94.6 7134.2"7' 6619.1~ 53.01 a7.~ 59~.~ 6592.65 6619,39 ~.e5 1.19 10328.52 85.4 7185.S3 66A7.24 52.77 87.26 597.59 W:IJ.71 bUl.47 M.a7 o.~ 10-42"i .26 100.7 72~5.67 676ß.21 ~.35 U.19 ¿oo. eo 6741.69 6768.41 ~.91 1.73 10525.56 96.3 7302 .56 6M5.77 53.2~ 89.26 1JIJ2 .53 6819.37 M45.94 84,95 1.46 lOó17.Y:J 92.0 TJ57.63 6919.29 53.26 90.39 6lJ2.76 6893.12 6919.42 es.oo 0.98 Ha t-U. 5 Pl-05/J7 51 81 ..11111111... ~ILL 11111111...1.1 ~ fALDJl.ATICH; ..1111.11111. CIRCULAR ARC ~ ftEASlfŒr ~ ~ICAL TMGf.i ~ATI(J; AZIrurH lJITITœE ~ ~I~ iit ~IPUn1 tLS œ>TH W1rI æ:rI(I~ ~. W-S E/-W èe9I .t' ft ft ft ft deg 11eq it ft ft ~ 100ft 10710.3-4 92.7 7411.5ð 6994.47 55.59 89.56 602.80 69b8.~ 6994.56 85.0.5 2.62 1~.42 94.1 74M.95 1071.73 55.XI ð9.73 603.29 1046.02 7071.80 85.11 0.35 1OB?B.47 9-i.l 7S1ð.7ð 1148.65 ~.M 89.36 603.90 7123.14 7148.69 85.15 0.55 10942.71 ~.2 75-«.26 71M.lL 5-4.77 89.41 ~.28' 7159.).1 71M.75 85.1~ 0.26 11M4.96 142.2 7626.25 T¥J(j.74 54.as U.3S 6Ob. 53 727S .52 J'YjfJ .7S 85.23 0.59 11182.37 97.4 7682.50 73ð0.17 5-4.61 U.14 608.94 7355.01 738C.1e as.V 0.32 11242.55 60.2 7718.05 1428.71 52.99 !5.07 611.80 7 ~3. 4ð 7428.72 85.28 4.91 11337.25 94.7 m4.H 7505.01 5-i.36 ð5.9 618.02 1119.52 7505.01 es.2ß 1.51 11433.28 96.0 7ð29.96 7583.14 ~.56 83.97 Ø.14 75'57.33 1583.15 !5. 27 1.37 115U.87 93.6 1M3.8611fJ9.i/J . - 35.12 .J4.15 ~~.06 JŒ.C3 '1/fft.64 '115.26 0.62 11560.00 33.1 1902.M 7(&.90 55.65 85.!5 ~.43 lbUJ.59 76M> /10 !5. 26 4.51 J1656.13 96.1 7956.06 77ó6.83 J6.90 16.Ç2 ~.47 :1740.38 17t.bM rs.'lJ 1.~ 11116.4ð ~.3 :J9M.76 7417.52 'Sl.-47 17 .13 .443.10 m1.03 .J.a17 .53 ~.2e J.oo 11807/57 91.1 -8~.36 N93.~ ~.~ 17 .10 -646. ~flb7 .34 cJ893.~ '..85.~ 1.01 11901.33 fJ.8 8OB9.94 1972.16 56.70 &.83 651.f19 1945.52 7972..16 85.32 0.29 11996.44 ~.1 ðl42.48 1051.40 '16.15 ~.x17 .61 "~.95;8124.Tl. ~8J51.40 '«).33 O.!3 U095.68 "99.2 8197.r7 .m33.61 SS.76 f,].15 ~.J! ,8106.Vl ~~33.61 c.il5.36 1).~ mI6.34 'to.7 4249'.'~.tð "115.6 ..;8.66 . MIO.&! ,,8W~ -'~lð 85.38 1..07 1221ð.!J 92.5 ~.&1 ,:8283;52 "'.32 10.'1 '461.17 ~#I ,82.83.52 v!5. 4l 1+86 12374.75 '95.9«159.34 ,-a360.62 ~.C2 1O.M 4.60.2h 'G34.53 ..8360.64 'ft). 47 0.98 12464.50 ð9.7 .1413.16 ~.17 52.90 89.76 ,659.88 ,~.35 M32.21 25.51 J.13 12559.M 95.4 80470.30 !5Oð. 40 ~.49 1i/.96 &1.40 ~.10 'I5œ.44 !5.5-4 1.63 12652.01 ~.1 852..718582.71 -"54.13 84.47 ~.'31 ~.a7 'W582.17 25.55 3.1~ W46.29 '4.3 ''8580.49 1658.73 -'SJ.33 84.e7 m."!l - '8632. ~ S65t.7t 85.s.. 0.92 12M2.36 96..1 1639 .02 1734.90 :51~1 85.U 6!9 .92 8708.45 8734. CJS 85.54 1.82 12933.65 '1.3 .8696.231806.04 'iIJ.77 ~.W .é85 .41 &719..37 ~06 !5.~ 1.06 Dm.31 VS.7 1756.35 ,&80.44 51.36 &.7ð ~.16 .m.63 tð8O.49 85.5-4 0.94 J3128.10 98.ð &17.15 t958.28 52.66 86.21 694.92 e931.34 ti5ð.~ 85.55 1.40 13216.01 67.9 M69.M 9028.64 53.71 eb.7ð llfl.22 9001.59 'W28. 70 85.56 1.~ 13314.35 98.3 em. 1e 9108.51 ~.9S &.51 703.90 90M.~ 9100.58 85.57 1.2ð 13407.17 92.8 8979.~7 9184.90 5S.M &.03 7œ.M 9157.5ð 91ð4 .97 e5.57 1.07 13503.45 96.3 9033.46 m4.89 56.51 &.43 714.14 9237 . 40 92b4. 97 85.5e 0.76 13593.65 90.2 ~.39 '9340.00 56.U 85.59 719.36 ~12.33 '934{).oe 85.58 0.83 13666.91 73.3 9123.63 9401.22 57.11 &.08 m.S! W3.39 '401.29 85.se 1.29 13742.97 76.1 9165 .12 9464.95 56.7ð 87.U 72J . 59 9437 .03 9465 .~ es. 59 1.23 13779.58 36.6 S'lB5.32 9m.~ 56,25 ð7.YJ 729.00 9467.53 9495 .56 e5 I 60 1.t3 13&28.00 ~.4 9212.23 9S35.6ð 56.20 aJ.60 7~.69 ~7.74 9535.78 ß5.61 0.10 ............ I."'...",.,'" Of~lSllV4L SUB - SURFACE ~:.~ DIRECTIONAL SURVEY RECEIVED OCT 1 4 1993 Alaska 0il & Gas Cons. Commis', Anchorage COmpany ARCO ALASKA, [tiC. Well Name P1-O5/O7 ST ~1 (1458'FSL & 697'FEL, SEC 16, T12N, R14E) Field/Lo<ation POINT NCINTYRE, NORTH SLOPE, ALASKA Job Reference No. 93369 Loqc~ed By: FORMICA Date, AUGUST 12, 1993 Computed By: SZNES on ~ SCHLUNIBERGER · GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR ARCO ALASKA, INC. P1-O5 / J7 ST #1 POINT MCINTYRE NORTH SLOPE, ALASKA SURVEY DATE- 12-AUG-1993 ENGINEER' JEFF FORMICA METHODS OF COMPUTATION TOOL LOCATION- MINIML~ CURVATURE INTERPOLATION- LINEAR VERTICAL SECTION- HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF NORTH 8S DEG 1S MIN EAST ARCO ALASKA, INC. P1-05 / J7 ST POINT MCINTYRE NORTH SLOPE, ALASKA COMPUTATION DATE: 31-AUG-93 PAGE 1 DATE OF SURVEY: 12-AUG-1993 KELLY BUSHING ELEVATION: 50.00 FT ENGINEER: JEFF FORMICA INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET, FEET DEG 0.00 100.00 100 2OO O0 2OO 300 O0 300 400 O0 399 500 O0 499 600 O0 599 700 O0 699 800.O0 799 900.O0 899 0 O0 -50 O0 0 0 N 0 0 E O0 50 O0 150 O0 250 99 349 98 449 94 549 83 649 61 749 30 849 O0 0 15 S 57 58 E O0 0 21 S 74 26 E O0 0 29 S 67 58 E 99 0 39 S 65 12 E 98 I 7 S 67 23 E 94 1 54 S 71 53 E 83 3 30 S 75 47 E 61 4 7 S 78 31E 30 4 48 S 83 6 E 0 O0 0 19 0 62 I 23 2 09 3 33 5.78 '10.07 16.47 24.02 0 O0 0 O0 0 21 0 28 0 05 ,1 05 0 1 0 0 69 11 41 85 0.00 N 0.11S 0.31S 0.57 S 0.96 S 1.57 S 2.46 S 3.74 S 10 5.23 S 16 6.49 S 24 000 E 0 0 1 2 3 6 0 O0 N 0 0 E 20 E 0 23 S 61 5 E 65 E 0 72 S 64 17 E 28 E I 41 S 65 54 E 18 E 2 38 S 66 18 E 47 E 3 81 S 65 45 E 01 E 6.49 S 67 43 E 42 E 11.07 S 70 14 E 96 E 17.75 S 72 52 E 65 E 25.49 S 75 15 E 1000 O0 998 82 948 82 6 45 N 87 50 E 1100 O0 1097 84 1047 1200 O0 1196 67 1146 1300 O0 1295 40 1245 1400 O0 1393 73 1343 1500 O0 1491 16 1441 1600 O0 1587 80 1537 1700 O0 1683 95 1633 1800 O0 1779 08 1729 1900.00 1873 19 1823 33.68 84 8 42 N 85 26 E 47.60 67 8 54 N 85 58 E 62.91 40 9 33 N 87 37 E 78.76 73 11 39 N 88 26 E 96.91 16 14 19 N 82 0 E 119.37 80 15 13 N 80 46 E 145.00 95 16 58 N 84 24 E 172.43 08 18 46 N 85 36 E 203.23 19 20 50 N 84 34 E 237.02 3 43 0 21 0 39 I 45 2 43 4 76 0 84 2 58 I 60 2 75 6.83 S 34 36 E 35 03 S 78 46 E 5.84 S 48 4.68 S 63 3.75 S 79 3.20 S 97 1.52 S 119 2.60 N 145 6.16 N 172 8.72 N 203 11.50 N 236 25 E 48 52 E 63 35 E 79 51E 97 90 E 119 28 E 145 52 E 172 21E 203 88 E 237 60 S 83 6 E 69 S 85 47 E 44 S 87 18 E 56 S 88 7 E 91 S 89 16 E 31 N 88 59 E 63 N 87 57 E 39 N 87 33 E 16 N 87 13 E 2000.00 1965.61 1915 61 24 2 N 82 35 E 275.14 2100.00 2056.01 2006 2200.00 2145.31 2095 2300 O0 2233 86 2183 2400 O0 2321 10 2271 2500 O0 2406 79 2356 2600 O0 2489 45 2439 2700 O0 2571 26 2521 2800 2900 01 26 15 N 83 12 E 317 83 31 27 11 N 84 12 E 362 86 28 25 N 83 19 E 409 10 29 50 N 82 37 E 458 79 32 52 N 83 22 E 509 45 34 56 N 84 28 E 565 26 35 25 N 85 29 E 623 O0 2650 71 2600.71 39 59 N 86 6 E 683 O0 2725 39 2675.39 42 53 N 84 28 E 750 83 2'7 O9 57 82 33 99 48 3 O0 1 22 0 72 2 50 0 99 4 92 0 78 I 52 5 08 1 74 15 93 N 274.77 E 275 23 N 86 41E 21 26 31 37 43 49 58 64 30 N 317.16 E 317 19 N 361,91E 362 07 N 408.10 E 409 22 N 456.58 E 458 56 N 507.71E 509 48 N 563.66 E 565 50 N 620.95 E 623 81 N 681.46 E 683 35 N 747.72 E 750 87 N 86 9 E 85 N 85 52 E 28 N 85 39 E 09 N 85 20 E 58 N 85 6 E 83 N 84 59 E 33 N 84 59 E 99 N 85 4 E 48 N 85 5 E 3000 O0 2797 78 2747.78 44 12 N 84 37 E 819.46 3100 3200 3300 34OO 3500 3600 3700 3800 3900 O0 2868 O0 2936 O0 2999 O0 3061 O0 3121 O0 3182 O0 3242 O0 3303 O0 3363 79 2818 79 45 41 N 85 23 E 889.86 25 2886 93 2949 31 3011 94 3071 21 3132 43 3192 08 3253 99 3313 25 49 10 N 87 10 E 963.64 93 51 28 N 86 56 E 1040.68 31 52 33 N 85 7 E 1119.61 94 52 49 N 85 8 E 1199.13 21 52 57 N 86 9 E 1278.93 43 52 57 N 86 21 E 1.358.75 08 52 24 N 83 49 E 1438.25 99 52 27 N 83 1E 1517.51 O. 90 3.84 2.52 2.16 1 85 1 O9 0 64 0 39 2 45 0 O3 71 01 N 816.38 E 819.46 N 85 2 E 77 26 N 886 50 E 889 86 N 85 I E 81 85 N 960 85 60 N 1037 91 07 N 1115 98 18 N 1195 104.20 N 1274 109.32 N 1354 115.70 N 1433 125.08 N 1512 16 E 963 64 N 85 8 E 15 E 1040 68 N 85 17 E 91 E 1119 62 N 85 20 E 11 E 1199 14 N 85 18 E 68 E 1278 93 N 85 20 E 35 E 1358 75 N 85 23 E 59 E 1438.25 N 85 23 E 34 E 1517.51 N 85 16 E COMPUTATION DATE' 31-AUG-93 PAGE 2 ARCO ALASKA, INC. P1-05 / J7 ST #1 POINT MCINTYRE NORTH SLOPE, ALASKA DATE OF SURVEY' 12-AUG-1993 KELLY BUSHING ELEVATION' 50.00 FT ~!~t~= ENGINEER- JEFF FORMICA INTERPO~~ VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COLRSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG 4000 O0 3424 77 3374 77 52 42 4100 4200 4300 4400 4500 4600 4700 4800 4900 O0 3485 O0 3545 O0 3605 O0 3666 O0 3726 O0 3786 O0 3845 O0 3905 O0 3965 28 3435 60 3495 94 3555 28 3616 40 3676 13 3736 81 3795 65 3855 67 3915 28 52 48 60 53 3 94 52 52 28 52 58 40 53 6 13 53 22 81 53 26 65 53 6 67 53 5 N 83 26 E 1596.86 N 83 58 E 1676.45 N 84 2 E 1756.19 N 84 15 E 1835.92 N 84 46 E 1915'.66 N 85 5 E 1995.57 N 85 29 E 2075.77 N 85 38 E 21'56.00 N 85 30 E 2236.12 N 85 26 E 2316.10 0 61 0 17 0 25 0 45 0 40 0 47 0 57 0 29 0 16 0 60 134 52 N 1591 19 E 1596 86 N 85 10 E 143 20 N 1670 151 52 N 1749 159 70 N 1828 167 30 N 1908 174 38 N 1987 180.99 N 2067 187.14 N 2147 193.36 N 2227 199.67 N 2307 33 E 1676 66 E 1756 98 E 1835 36 E 1915 96 E 1995 88 E 2075 88 E 2156 76 E 2236 50 E 2316 45 N 85 6 E 20 N 85 3 E 94 N 85 I E 68 N 84 59 E 59 N 84 59 E 79 N 85 0 E 02 N 85 i E 14 N 85 2 E 12 N 85 3 E 5000 O0 4025 90 3975 90 52 45 5100 5200 5300 5400 5500 5600 5700 5800 590O O0 4086 O0 4145 O0 4205 O0 4265 O0 4323 O0 4382 O0 4440 O0 4498 O0 4557 20 4036 73 4095 89 4155 45 4215 68 4273 02 4332 42 4390 88 4448 89 4507 20 53 21 73 53 25 89 52 48 45 54 11 68 54 26 02 54 15 42 54 21 88 53 53 89 53 58 6000 O0 4617 09 4567 09 53 34 6~0O 6200 6300 6400 6500 6600 6700 6800 O0 4676 O0 4736 O0 4796 O0 4857 O0 4916 O0 4975 O0 5034 O0 5093 6900 O0 5152 37 4626 35 4686 81 4746 46 4807 58 4866 2O 4925 21 4984 58 5043 18 5102 37 53 31 35 52 55 81 52 30 46 53 9 58 54 7 20 53 59 21 53 39 58 53 44 18 54 19 7000.00 5210 61 5160 61 54 15 7100.005268 7200.00 5326 730O.O0 5385 7400.00 5443 7500.00 '5501 76O0.00 5559 7700.00 5617 7800.00 5675 75 5218 77 5276 30 5335 83 5393 86 5451 85 5509 53 5567 32 5625 7900.00 5733 47 5683 75 54 41 77 54 19 30 54 7 83 54 2O 86 54 35 86 54 45 53 54 45 32 54 39 47 54 19 N 83 27 E 2395 93 N 82 4 E 2475 N 81 52 E 2555 N 81 13 E 2635 N 81 16 E 2715 N 82 4 E 2796 N 82 2 E 2877 N 82 5 E 2958 N 81 51E 3039 N 81 45 E 3120 6O 83 53 66 79 89 93 93 52 N 81 32 E 3200 95 N 81 24 E 3281 N 81 7 E 3361 N 80 5O E 3440 N 81 5 E 3519 N 81 48 E 3600 N 82 11E 3681 N 82 19 E 3761 N 82 56 E 3842 N 83 55 E 3923 31 13 57 84 31 20 82 20 20 N 84 I E 4004 33 N 84 6 E 4085 N 84 4 E 4167 N 84 18 E 4248 N 84 26 E 4329 N 84 32 E 4410 N 84 10 E 4492 N 84 11E 4573 N 84 14 E 4655 N 84 21E 4736 67 lO 17 24 68 13 81 40 74 3 98 0 93 0 45 0 62 0 97 0 38 0 22 0 26 1 O2 0 26 0 60 0 58 0 25 0 75 1 83 0 60 0 52 0 72 1 82 0 28 0 21 0 20 0 6O 0 26 0 52 0 27 0 79 0 22 0 13 0 74 206.88 N 2386 99 E 2395 94 N 85 3 E 217.36 N 2466 228.59 N 2545 240.36 N 2624 252.64 N 2704 264.44 N 2784 275.62 N 2864 286.88 N 2945 298.17 N 3025 309.72 N 3105 07 E 2475 64 E 2555 64 E 2635 02 E 2715 46 E 2796 90 E 2878 29 E 2959 63 E 3040 54 E 3120 63 N 84 58 E 88 N 84 52 E 62 N 84 46 E 80 N 84 40 E 98 N 84 34 E 13 N 84 30 E 23 N 84 26 E 29 N 84 22 E 94 N 84 18 E 321 41 N 3185 28 E 3201 45 N 84 14 E 333 345 357 370 382 393 404 415 424 37 N 3264 53 N 3344 98 N 3422 62 N 3501 59 N 3580 82 N 3661 72 N 3741 21N 3820 20 N 3901 92 E 3281 O1E 3361 68 E 3441 17 E 352O 93 E 3601 17 E 3682 16 E 3762 94 E 3843 47 E 3924 89 N 84 10 E 81 N 84 6 E 35 N 84 2 E 73 N 83 57 E 31 N 83 54 E 29 N 83 52 E 99 N 83 50 E 43 N 83 48 E 46 N 83 48 E 432 75 N 3982 17 E 4005 62 N 83 48 E 441 13 N 4063 449 53 N 4144 457 77 N 4224 465 74 N 4305 473 53 N 4386 481 58 N 4467 489 89 N 4548 498.08 N 4630 506.26 N 4711 10 E 4086 11E 4168 77 E 4249 46 E 4330 53 E 4412 59 E 4493 86 E 4575 06 E 4656 O0 E 4738 97 N 83 48 E 42 N 83 49 E 50 N 83 49 E 58 N 83 50 E 02 N 83 50 E 47 N 83 51E 17 N 83 51E 78 N 83 52 E 13 N 83 52 E ARCO ALASXA, INC. P1-O5 / J7 ST #1 POINT MCINTYRE NORTH SLOPE, ALASKA COMPUTATION DATE: 31-AUG-93 PAGE 3 DATE OF SURVEY: 12-AUG-1993 KELLY BUSHING ELEVATION: 50.00 FT ENGINEER: JEFF FORMICA INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGl~R COORDINATES HDRIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION ~IMLFFH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET ,FEET FEET DEG MIN 8000.00 5791 54 5741 ,54 54 42 N 84 35 E 4818.15 8100.00 5849 8200.00 5906 8300.00 5964 8400.00 6021 8500.00 6079 8600.00 6138 8700.00 6198 8800.00 6258 8900.00 6320 24 5799 95 5856 30 5914 61 5971 90 6029 70 6088 15 6148 89 6208 39 6270.39 52 4 N 85 14 E 5546 24 54 47 N 84 56 E 4899.82 95 54 44 N 85 29 E 4981.49 30 55 13 N 86 21 E 5063.40 61 54 40 N 86 20 E 5145 33 90 54 9 N 85 41E 5226 58 70 53 48 N 85 52 E 5307 46 16 53 6 N 85 58 E 5387 86 89 52 17 N 84 39 E 5467 29 15 0 26 0 34 0 74 0 69 I 40 0 0 1 0 1 45 25 56 65 27 514.07 N 4792 04 E 4819.54 N 83 53 E 521 56 N 4873 528 534 539 545 551 556 563 57O 43 N 4954 23 N 5036 22 N 5118 06 N 5199 06 N 5279 65 N 5360 42 N 5439 38 N 5517 37 E 4901.20 N 83 53 E 75 E 4982.85 N 83 55 E 46 E 5064.72 N 83 57 E 26 E 5146.58 N 83 59 E 30 E 5227.80 N 84 I E 96 E 5308.64 N 84 3 E 17 E 5389.00 N 84 4 E 32 E 5468.42 N 84 5 E 87 E 5547.27 N 84 6 E 9000.00 6381.33 6331 33 52 33 N 85 20 E 5625 43 9100 O0 6442.32 6392 9200 O0 6503.53 6453 9300 O0 6563.79 6513 9400 O0 6624.60 6574 9500 O0 6686.16 6636 9600 O0 6747.64 6697 9700.00 6808.69 6758 9800.00 6870.03 6820 9900.00 6931.90 6881 32 52 17 N 85 26 E 5704 53 52 30 N 84 54 E 5783 79 53 0 N 83 56 E 5863 60 52 20 N 84 25 E 5942 16 51 48 N 84 33 E 6021 64 52 11 N 83 56 E 6100 69 52 17 N 83 33 E 6179 03 51 49 N 83 47 E 6258 90 51 52 N 83 53 E 6337 68 76 54 91 72 58 75 69 23 0 4O 0 23 2 56 0 78 1 14 0 54 I O6 0 79 1 51 0 89 576.88 N 5596 89 E 5626 54 N 84 7 E 583.28 N 5675 589 64 N 5754 597 75 N 5834 605 74 N 5913 613 21N 5991 621 12 N 6069 629 83 N 6148 638 60 N 6227 546 97 N 6305 88 E 5705 70 E 5784 08 E 5864 07 E 5944 52 E 6022 99 E 6101 71E 6180 20 E 6259 31E 6338 77 N 84 8 E 83 N 84 9 E 63 N 84 9 E 01 N 84 9 E 82 N 84 9 E 69 N 84 9 E 89 N 84 9 E 86 N 84 9 E 42 N 84 8 E 10000.00 6992.92 6942 92 52 37 N 84 1 E 6416 43 10100.00 7053.31 7003 31 53 28 N 85 10 E 6496 10200.00 7112.39 7062 39 53 39 N 86 11 E 6576 10300,00 7172.22 7122 22 52 52 N 86 42 E 6656 10400.00 7231.76 7181 76 54 19 N 86 57 E 6737 10500.00 7290.23 7240 23 53 46 N 87 45 E 6818 10600.00 7350.00 7300 O0 53 7 N 88 57 E 6898 10700.00 7408.35 7358.35 55 39 N 88 47 E 6979 10800.00 7464.81 7414.81 55 27 N 89 5 E 7061 10900.00 7521.70 7471.70 55 7 N 88 49 E 7143 13 8O 91 22 29 34 37 74 81 0 54 2 48 0 79 I O3 I 3O 1 83 I 29 I 16 0 72 0 52 655.38 N 6384 09 E 6417 64 N 84 8 E 663.08 N 6463 669.01N 6543 673.97 N 6623 678.40 N 6704 682.27 N 6785 684.50 N 6865 686.05 N 6946 687.53 N 7028 689.12 N 7111 42 E 6497 88 E 6577 85 E 6658 07 E 6738 10 E 6819 24 E 6899 42 E 6980 95 E 7062 17 E 7144 34 N 84 9 E 99 N 84 10 E O5 N 84 11E 31 N 84 13 E 31 N 84 15 E 28 N 84 18 E 22 N 84 22 E 49 N 84 25 E 48 N 84 28 E 11000.00 7579 19 7529 19 54 49 N 88 58 E 7225.46 11100.00 7636 11200.00 7693 11300.00 7753 11400.00 7811 11500.00 7870 11600.00 7927 11700.00 7982 118OO O0 8036 61 7586 96 7643 01 7703 84 7761 11 7820 25 7877 41 7932 58 7986 11900 O0 8091 65 8041 61 55 0 N 87 40 E 7307 21 96 54 48 N 87 11 E 7389 O1 53 23 N 86 40 E 7469 84 54 13 N 86 46 E 7550 11 54 34 N 86 44 E 7631 25 55 49 N 87 12 E 7713 41 57 7 N 87 55 E 7797 58 56 52 N 88 5 E 788I 65 56 27 N 87 53 E 7964 O7 74 57 81 84 18 13 51 O. 90 0.36 I . 73 1 . 08 0 75 0 77 1 40 I 43 0 87 0 81 690.55 N 7192 98 E 7226 05 N 84 31 E 693.06 N 7274 696.62 N 7356 701.10 N 7437 705.65 N 7517 710.27 N 7599 714.70 N 7681 718.30 N 7764 721.06 N 7848 723.97 N 7931 81 E 7307 75 N 84 33 E 65 E 7389 56 N 84 35 E 23 E 7470 20 N 84 37 E 96 E 7551 O0 N 84 38 E 10 E 7632 22 N 84 40 E 04 E 7714.22 N 84 41 E 37 E 7797.53 N 84 43 E 38 E 7881.44 N 84 45 E 80 E 7954.77 N 84 47 E COMPUTATION DATE: 31-AUG-g3 PAGE 4 ARCO ALASKA, INC. PI-05 / J7 ST #1 POINT MCINTYRE NORTH SLOPE, ALASKA DATE OF SURVEY: 12-AUG-1993 KFliy BUSHING ELEVATION: 50.00 FI' ENGINEER: JEFF FORMICA INTERPOLAIF_D VALUES FOR EVEN 100 FEET OF MEASURED DEPTH 1-RUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZI~[rrH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IOO FEET FEET FEET DEG MIN 12000 O0 8146 75 8096 75 56 25 12100 12200 12300 12400 12500 12600 12700 12800 12900 O0 8202 O0 8258 O0 8316 O0 8375 O0 8435 O0 8495 O0 8553 O0 8613 O0 8675 44 8152 85 8208 56 8266 59 8325 25 8385 04 8445 84 8503 48 8563 20 8625 44 55 52 85 55 25 56 54 23 59 53 32 25 53 0 04 53 47 84 53 57 48 52 40 20 51 1 N 87 22 E 8047 89 N 88 1E 8130 N 89 16 E 8213 S 88 55 E 8294 S 88 35 E 8374 S 89 28 E 8454 N 87 28 E 8534 N 84 55 E 8615 N 85 37 E 8695 N 86 30 E 8774 88 31 66 89 76 71 58 85 51 0 81 0 95 2 44 I 84 1 42 1 14 3 87 0 34 1 62 1 57 727 65 N 8015 17 E 8048 13 N 84 49 E 731 733 732 73O 729 730 736 743 748 05 N 8098 13 N 8180 77 N 8262 62 N 8343 41N 8423 42 N 8503 32 N 8584 O1N 8664 40 N 8742 16 E 8131 7O E 8213 36 E 8294 O5 E 8374 29 E 8454 43 E 8534 09 E 8615 08 E 8695 57 E 8774 09 N 84 51E 49 N 84 53 E 79 N 84 56 E 98 N 85 0 E 82 N 85 3 E 74 N 85 5 E 61 N 85 6 E 88 N 85 6 E 54 N 85 6 E 13000 O0 8738 51 8688 51 50 51 13100 O0 8800 13200 O0 8861 13300 O0 892O 13400 O0 8977 13500 O0 9033 13600 O0 9089 13700 O0 9145 13750 O0 9173 97 8750 68 8811 73 8870 93 8927 95 8983 44 9039 31 9095 19 9123 97 51 59 68 53 16 73 54 20 93 55 49 95 56 20 44 56 0 31 56 7 19 56 7 N 87 43 E 8851 88 N 88 0 E 8929 N 87 52 E 9009 N 87 48 E 9089 N 87 28 E 9171 N 86 46 E 9254 N 86 18 E 9337 N 85 59 E 9420 N 85 59 E 9462 89 25 88 83 62 79 71 22 0 83 1 07 0 47 1 58 1 23 1 oo 3 25 0 O0 0 O0 752 33 N 8819 87 E 8851 90 N 85 7 E 755 758 761 764 768 773 779 782 16 N 8897 06 N 8977 11N 9057 50 N 9139 67 N 9222 70 N 9305 39 N 9388 29 N 9429 91E 8929 31E 9009 96 E 9O89 91E 9171 64 E 9254 68 E 9337 42 E 9420 82 E 9462 90 N 85 9 E 26 N 85 10 E 88 N 85 12 E 83 N 85 13 E 62 N 85 14 E 79 N 85 15 E 71 N 85 15 E 22 N 85 15 E ARCO ALASKA, INC. P1-05 / J7 ST #1 POINT MCINTYRE NORTH SLOPE, ALASKA T~UE SUB-SEA COURSE MEASURED VEETICAL VEETICAL DEVIATION AZI~JTH DEPTH DEPTH DEPTH DEG MIN DEG MIN O. O0 1000.00 998 2000.00 1965 3000.00 2797 4000.00 3424 5000.00 4025 6000.00 4617 7000.00 5210 8000.00 5791 82 948 61 1915 78 2747 77 3374 90 3975 09 4567 61 5160 54 5741 9000.00 6381.33 6331 COMPUTATION DATE: 31-AUG-93 PAGE 5 DATE OF SURVEY: 12-AUG-1993 ,/~~m.~ .... KELLY BUSHING ELEVATION' 50.00 FT ~ ~. ~,~.r~, ~ ~ ;~ r,:~ ~ . ~' ,' ~'-- ~ ENGINEI=R' JEFF FORMICA INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0 O0 -50 O0 0 0 82 6 45 61 24 2 78 44 12 77 52 42 90 52 45 O9 53 34 61 ,54 15 54. ,.54 42 33 52 33 N 0 0 E 0.00 N 87 50 E 33.68 N 82 35 E 275.14 N 84 37 E 819.46 N 83 26 E 1596.86 N 83 27 E 2395.93 N 81 32 E 3200.95 N 84 I E 4004.33 N 84 35 E 4818.15 N 85 20 E 5625.43 O. O0 3 43 3 O0 0 90 0 61 3 98 0 6O 0 21 0 26 0 4O 0 O0 N 15 71 134 206 321 432 514 576 0 O0 E 83 S 34 93 N 274 01N 816 52 N 1591 88 N 2386 41N 3185 75 N 3982 07 N 4792 88 N 5596 0 O0 N 0 0 E 36 E 35 03 S 78 46 E 77 E 275 23 N 86 41 E 38 E 819 46 N 85 2 E 19 E 1596 86 N 85 10 E 99 E 2395 94 N 85 3 E 28 E 3201.45 N 84 14 E 17 E 4005.62 N 83 48 E 04 E 4819.54 N 83 53 E 89 E 5626.54 N 84 7 E 10000.00 6992.92 6942.92 52 37 11000.00 7579.19 7529.19 54 49 12000.00 8146.75 8096.75 56 25 13000.00 8738.51 8688.51 50 51 13750.00 9173.19 9123.19 56 7 N 84 I E 6416.43 N 88 58 E 7225.46 N 87 22 E 8047.89 N 87 43 E 8851.88 N 85 59 E 9462.22 O. 64 O. 9O 0.81 O. 83 O. O0 655.38 N 6384.09 E 6417.64 N 84 8 E 690.55 N 7192.98 E 7226.05 N 84 31 E 727.65 N 8015.17 E 8048.13 N 84 49 E 752.33 N 8819.87 E 8851.90 N 85 7 E 782.29 N 9429.82 E 9462.22 N 85 15 E COMPUTATION DATE' 31-aUG-93 PAGE 6 ARCO ALASKA, INC. P1-05 / J7 ST #1 POINT MCINTYRE NORTH SLOPE, ALASKA DATE OF SURVEY' 12-AL~-1993 KELLY BLLSHING ELEVATION' 50.00 FT ENGINEER' JEFF FORe'ICA INTERPOLAll~I) VALUES FOR EVEN iO0 FEET OF SUB-SEA DEPTH TEUE SUB-SEA COURSE MEASUEED VEETICAL VERTICAL DEVIATION kZI~rrH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0 O0 50 O0 150 O0 25O oo 350 01 450 01 550 03 650 09 750 27 850 53 0 O0 50 O0 150 O0 250 O0 350 oo 450 O0 550 O0 650 O0 750 O0 850 O0 -50.00 0 0 N 0 0 E 0.00 0 13 S 60 41 E 100.00 0 17 S 62 38 E 200.00 0 22 S 65 18 E 300.00 0 33 S 66 46 E 400.00 0 47 S 63 35 E 500.00 I 34 S 70 39 E 600.00 2 35 S 73 22 E 700.00 3 52 S 77 7 E 800.00 4 30 S 80 45 E 0 O0 0 03 0 38 0 91 I 64 2 63 4 41 7 56 13 15 20 12 0 oo 0 26 0 oo 0 O0 0 oo 0 36 0 54 2 01 0 60 0 89 0.00 N 0.01 N 0.22 S 0.43 S 0 75 S I 22 S I 98 S 3 04 S 4 50 S 5 92 S 0 O0 E 0 03 E 0 40 E 0 g5 E 171E 2 74 E 4 59 E 7.84 E 13.57 E 20.68 E 000 N O O E 0 0 1 1 3 8 14 21 03 N 74 5 E 46 S 60 47 E 04 S 65 39 E 86 S 66 24 E O0 S 65 55 E O0 S 66 39 E 41 S 68 47 E 30 S 71 40 E 51 S 74 I E 950 90 1051 1152 1254 1355 1457 1560 1664 1769 1875 950 O0 62 1050 O0 1000 77 1150 O0 1100 O0 1250 O0 1200 45 1350 O0 1300 62 1450 O0 1400 85 1550.00 1500 59 1650.00 1600 33 1750.00 1700 23 1850.00 1800 900 O0 5 30 O0 ' 8 13 O0 8 49 O0 9 5 O0 10 30 O0 13 12 O0 14 59 O0 16 8 O0 18 18 O0 20 15 S 87 51E N 85 37 E N 85 38 E N 86 33 E N 88 27 E N 85 35 E N 80 27 E N 83 3 E N 85 31E N 85 7 E 28.49 40.45 55 64 71 34 88 39 109 134 162 193 228 31 84 35 48 31 2 40 1 44 0 O2 0 64 2 13 3 45 0 38 2 55 I 34 2 O0 6 85 S 6 5 4 3 2 O 5 7 10 40 S 41 22 S 56 13 S 71 43 S 88 61S 109 93 N 135 07 N 162 96 N 193 71N 228 29 16 E 29 95 S 76 47 E 12 E 41 62 S 81 9 E 27 E 56 51 S 84 42 E 93 E 72 04 S 86 43 E 98 E 89 05 S 87 48 E 90 E 109 93 S 88 39 E 22 E 135.23 N 89 36 E 49 E 162.57 N 88 13 E 49 E 193.65 N 87 39 E 21 E 228.46 N 87 19 E 1982 92 1950 O0 1900.00 23 31 2093 2205 2318 2433 2551 2673 2799 2933 3073 29 2050 28 2150 37 2250 40 2350 99 2450 96 2550 06 2650 75 2750 29 2850 O0 2O00.00 26 11 O0 2100.00 27 13 O0 2200.00 28 50 O0 2300.00 30 21 O0 2400.00 34 31 O0 2500.00 35 9 O0 2600.00 39 56 O0 2700.00 43 27 O0 2800.00 45 0 N 82 40 E 268.22 N 83 8 E 314.87 N 84 13 E 365.24 N 82 55 E 418.03 N 82 46 E 474.82 N 84 1E 538.46 N 85 16 E 608.28 N 86 7 E 683.38 N 84 23 E 773.56 N 85 2 E 870.87 2 98 1 23 0 70 2 48 2 1 0 5 1 2 04 46 84 12 61 04 15 04 N 267 89 E 268.31 N 86 47 E 20 26 32 39 46 53 58 66 75 95 N 314 44 N 364 10 N 416 35 N 473 74 N 536 28 N 605 77 N 680 59 N 770 67 N 867 21E 314.91 N 86 11E 31E 365.26 N 85 51E 81 E 418.04 N 85 36 E 19 E 474.82 N 85 15 E 43 E 538.47 N 85 I E 95 E 608.29 N 84 59 E 85 E 683.38 N 85 4 E 70 E 773.57 N 85 4 E 58 E 870.88 N 85 I E 3221.20 2950 O0 2900 O0 49 46 3381.43 3050 O0 3000 3546.52 3150 O0 3100 3712.54 3250 O0 3200 3877 03 3350 O0 3300 4041 66 3450 O0 3400 4207 32 3550.00 3500 4373 O0 3650.00 3600 4539 42 3750.00 3700 4707 02 3850.00 3800 O0 52 28 O0 52 58 O0 52 54 O0 52 30 O0 52 46 O0 53 2 O0 52 54 O0 53 19 O0 53 25 N 87 15 E 979.76 N 85 28 E 1104 89 N 85 39 E 1236 N 86 15 E 1368 N 83 1E 1499 N 83 44 E 1630 N 84 2 E 1762 N 84 40 E 1894 N 85 13 E 202'7 N 85 37 E 2161 24 74 30 OO O3 12 14 63 3 O3 1 60 0 86 0 76 0 26 0 53 0 37 0 37 0 74 0 34 82 63 N 976.27 E 979.76 N 85 10 E 89 101 109 122 138 152 165 177 187 90 N 1101.23 E 1104.89 N 85 20 E 14 N 1232.10 E 1236.25 N 85 18 E 98 N 1364.32 E 1368 75 N 85 23 E 86 N 1494.26 E 1499 30 N 85 18 E 23 N 1624.13 E 1630 O0 N 85 8 E 13 N 1755.47 E 1762 05 N 85 3 E 31 N 1886.91 E 1894 13 N 85 0 E 05 N 2019.42 E 2027 16 N 84 59 E 57 N 2153.50 E 2161 65 N 85 1 E ARCO ALASKA, INC. P1-O5 / J7 ST #1 POINT MCINTYRE NORTH SLOPE, A~KA COMPUTATION DATE' 31-AUG-93 PAGE 7 DATE OF SURVEY: 12-AUG-1993 KELLY BUSHING ELEVATION: 50.00 FI' ENGINFFR: JEFF FOR~IICA INTERP0~TED VALUES FOR EVEN 100 FEET OF SB3-SEA DEPTH TRUE SUB-SEA COUESE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 4873 88 3950 O0 3900 O0 53 8 5039 5207 5373 5545 5716 5886 6055 6222 6387 8O 4050 16 4150 73 4250 18 4350 44 4450 59 4550 53 4650 65 4750 54 4850 O0 4000 O0 4100 O0 4200 O0 4300 O0 4400 O0 4500 O0 4600 O0 4700 O0 4800 O0 52 45 O0 53 22 O0 53 50 O0 54 18 O0 54 23 O0 53 56 O0 53 42 O0 52 56 O0 52 57 6557 05 4950 O0 4900 O0 54 9 6726 6896 7067 7239 7410 7582 7756 7928 8101 60 5050 27 5150 62 5250 74 5350 60 5450 93 5550 23 5650 35 5750 33 5850 O0 5000 O0 5100 O0 5200 O0 5300 O0 5400 O0 5500 O0 5600 O0 5700 O0 5800 O0 53 32 O0 54 19 O0 54 32 O0 54 9 O0 54 24 O0 54 37 O0 54 41 O0 54 22 O0 54 47 8274 95 5950.00 5900.00 55 10 8448 87 6050 O0 6000.00 54 17 8619 11 6150 8785 46 6250 8948 46 6350 9112 55 6450 9277 05 6550 9441.44 6650 9603.86 6750 9767.45 6850 O0 6100.00 53 45 O0 6200.00 52 22 O0 6300.00 52 32 O0 6400.00 52 16 O0 6500.00 53 6 O0 6600.00 52 1 O0 6700.00 52 12 Op 6800.00 52 12 9929.43 6950 O0 6900 O0 52 14 10O94 43 7050 10263 10431 10600 10773 10949 11123 11294 11465 08 7150 31 7250 O0 7350 86 7450 34 7550 35 7650 96 7750 37 7850 O0 7000 O0 7100 O0 72OO O0 7300 O0 7400 O0 7500 O0 7600 O0 7700 O0 7800 O0 53 22 O0 53 8 O0 54 24 O0 53 7 O0 55 33 O0 54 52 O0 55 2 O0 53 20 O0 54 27 N 85 28 E 2295 22 N 82 23 E 2427 N 81 49 E 2561 N 81 12 E 2694 N 82 7 E 2833 N 82 5 E 2972 N 81 45 E 3109 N 81 27 E 3245 N 81 6 E 3379 N 80 58 E 3509 57 56 45 46 27 69 58 16 89 N 82 6 E 3646 47 N 82 23 E 3783 N 83 55 E 3920 N 84 6 E 4059 N 84 8 E 4199 N 84 27 E 4337 N 84 11E 4478 N 84 16 E 4619 N 84 28 E 4759 N 84 56 E 4900 20 17 28 35 86 19 71 77 91 N 86 9 E 5042 84 N 85 47 E 5185 10 N 85 56 E 5322 87 N 84 37 E 5455 79 N 85 19 E 5584 50 N 85 27 E 5714 61 N 83 54 E 5845 21 N 84 35 E 5975 65 N 83 54 E 6103 63 N 83 38 E 6233.05 N 83 53 E 6360.43 N 85 5 E 6491.64 N 86 32 E 6627.43 N 87 6 E 6762.65 N 88 57 E 6898 34 N 89 4 E 7040 24 N 89 3 E 7184 14 N 87 38 E 7326 33 N 86 40 E 7465 70 N 86 45 E 7603 63 0 32 1 26 0 75 I 7O 0 37 0 21 0 5O 0 38 0 35 I 96 0 75 0 35 0 30 0 63 0 20 0 56 I 06 0 27 0 76 0 35 0 . 88 O. 64 0.59 0 46 O. 57 O. 23 0 35 0 91 1 14 1 O9 I 64 2 66 0 75 0 64 1 29 0 59 0 69 0 40 0 86 0 65 198 01 N 2286 67 E 2295 23 N 85 3 E 210 229 249 269 288 308 328 348 369 83 N 2418 40 N 2551 40 N 2683 48 N 2820 72 N 2958 16 N 3094 04 N 3229 32 N 3361 42 E 2427 32 E 2561 02 E 2694 83 E 2833 52 E 2972 81E 3110 51E 3246 86 E 3379 59 N 85 I E 62 N 84 52 E 58 N 84 41E 67 N 84 33 E 58 N 84 26 E 11 N 84 19 E 13 N 84 12 E 86 N 84 5 E 08 N 3491 32 E 3510 77 N 83 ~ E 389 07 N 3626 71 E 3647 52 N 83 53 E 407 423 438 452 466 480 494 508 521 57 N 3762 88 N 3898 42 N 4036 85 N 4176 57 N 4314 17 N 4453 51N 4594 50 N 4733 65 N 4874 38 E 3784 46 E 3921 84 E 4060 19 E 4200 04 E 4339 73 E 4479 54 E 4621 92 E 4761 39 N 83 49 E 44 N 83 48 E 57 N 83 48 E 67 N 83 49 E 20 N 83 50 E 54 N 83 51E 07 N 83 51E 16 N 83 52 E 45 E 4902 29 N 83 53 E 532.88 N 5015 94 E 5044 17 N 83 56 E 541 95 N 5157 93 E 5186 552 16 N 5295 33 E 5324 562 34 N 5427 87 E 5456 573 54 N 5556 09 E 5585 584 07 N 5685 77 E 5715 595 81 N 5815.85 E 5846 608 88 N 5945.66 E 5976 621 44 N 6073.03 E 6104 33 N 84 0 E 04 N 84 3 E 92 N 84 5 E 62 N 84 6 E 69 N 84 8 E' 29 N 84 9 E 75 N 84 9 E 74 N 84 9 E 635.78 N 6201.70 E 6234 21 N 84 9 E 649.44 N 6328 38 E 6361.62 N 84 8 E 662 72 N 6458 672 679 684 687 689 693 700 708 22 N 6594 72 N 6729 50 N 6865 18 N 7007 87 N 7151 85 N 7293 86 N 7433 67 N 7570 95 E 6492.86 N 84 9 E 42 E 6628.59 N 84 11E 48 E 6763.72 N 84 14 E 24 E 6899.28 N 84 18 E 41 E 7041.02 N 84 24 E 58 E 7184.77 N 84 29 E 92 E 7326.85 N 84 34 E 19 E 7466.16 N 84 37 E 95 E 7604.05 N 84 39 E COMPUTATION DATE: 31-AUG-93 PAGE 8 ARCO ALASKA, INC. Pl-05 / J7 ST #1 POINT MCINIYRE NORTH SLOPE, A~KA DATE OF SURVEY: 12-AUG-1993 KELLY BUSHING ELEVATION: 50.00 FT ENGINFFR: JEFF FORMICA INll~RPOLAll~D VALUES FOR EVEN 100 FEE-r OF SUB-SEA DEPTH TRUE SLEt-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZINJJTH DEPTH DEPTH DEPTH DEG WIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARllJ~E SECTION SEVERITY NORTH/SOUTH FAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 11640 79 7950 OO 7900 O0 56 27 11824 12005 12184 12356 12524 12693 12859 13018 13180 50 8050 88 8150 38 8250 90 8350 53 8450 48 8550 64 8650 22 8750 53 8850 O0 8OO0 O0 8100 O0 8200 O0 8300 O0 840O O0 8500 O0 8600 O0 8700 O0 8800 O0 56 41 O0 56 23 O0 55 33 O0 53 39 O0 53 1 O0 53 58 O0 51 44 O0 50 58 O0 53 2 N 87 28 E 7747 67 N 88 0 E 7901 N 87 23 E 8052 N 88 59 E 8200 S 88 17 E 834O S 89 51E 8474 N 84 57 E 8610 N 86 11E 8743 N 87 50 E 8866 N 87 55 E 8993 60 79 47 43 28 31 O0 O0 70 2 22 0 76 0 85 I 65 0 93 1 85 0 43 2 29 0 95 1 61 716 28 N 7714 86 E 7748.04 N 84 42 E 721 727 732 731 729 735 746 752 76 N 7868 88 N 8020 92 N 8167 60 N 8308 29 N 8442 86 N 8578 39 N 8711 88 N 8834 757.49 N 8961 86 E 7901.89 N 84 46 E 06 E 8053.03 N 84 49 E 83 E 8200.65 N 84 52 E 38 E 8340.53 N 84 58 E 89 E 8474.32 N 85 4 E 84 E 8610.34 N 85 6 E 11 E 8743.03 N 85 6 E O0 E 8866.02 N 85 8 E 75 E 8993.71 N 85 10 E 13350.70 8950.00 8900.00 55 7 13528.98 9050.00 9000.00 56 23 13708.41 9150.00 9100.00 56 7 13750.00 9173.19 9123.19 56 7 N 87 38 E 9131.24 N 86 40 E 9278.74 N 85 59 E 9427.69 N 85 59 E 9462.22 i . 46 O. 80 0. O0 O. O0 762.75 N 9099.32 E 9131.24 N 85 13 E 770.05 N 9246.73 E 9278.74 N 85 14 E 779.88 N 9395.38 E 9427.69 N 85 15 E 782.29 N 9429.82 E 9462.22 N 85 15 E COMPUTATION DATE: 31-AUG-93 PAGE g ARCO ALASKA, INC. P1-05 / J7 ST #1 POINT MCINTYRE NORTH SLOPE, ALASKA INTERPOLATED VALUES FOR CHOSEN HORIZONS DATE OF SURVEY: 12-AUG-1993 KFlly BUSHING ELEVATION: 50.00 FT ENGINEER: JEFF FORe, ICA IVlARKER GCT LAST READING TD SURFACE LOCATION = 1458' FSL ~ 697' FEL, SECl6 T12N R14E MEASURED DEPTH I'VD RECTANGULAR COORDINATES BELOW KB FROM KB SUB-SEA NORTH/SOUTH EAST/WEST 13650.00 9117.44 9067.44 776.48 N 9347.01 E 13724.00 9158.69 9108.69 780.78 N 9408.29 E ARCO A~KA, INC. PI-05 / J7 ST #1 POINT MCIN1-YRE NORTH SLOPE, AL~KA lVlARKER COMPUTATION DATE: 31-AUG-93 PAGE 10 ,;i~i:.;.i!,i,.il:[;,.::i DATE OF SURVEY' 12-AUG-1993 ~':" I':~: KFIIY BUSHING ELEVATION- 50.00 ET ,,,,,~,~¢~, ,',"tt ENGINEER: JEFF FORe, ICA ************ STRATIGRAPHIC SI~MARY SURFACE LOCATION = 1458' FSL & 697' FEE, SEC16 T12N R14E NEARED DEPll~ I'VD RECTANGULAR COORDINATES BELOW KB FROM KB SUB-SEA NOR-FH/SOLr~H EAST/WEST 13724.00 9158.69 9108.69 780.78 N 9408.29 E FINAL WELL LOCATION AT TD: TRUE SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH HORIZONTAL DEPARTURE DISTANCE AZIMUTH FEET DEC 13750.00 9173.19 9123.19 9462.22 N 85 15 E DIRECTIONAL SURVEY COMPANY ARCO ALASKA, INC. FIELD POINT MClNTYRE WELL P1-05 / J7 ST #1 COUNTRY USA RUN ONE DATE LOGGED 12 - AUG - 93 DEPTH UNIT FEET REFERENCE 93369 Interpretations are oplrHon$ baa~d on lnfererlc~ from electrical or o~ mea,~ur~'nent~ and we cannot, and do not guarantee the accur~-y or cor~ctne~ of any Interpretations. and we Ihall nc~, except In th~ cae~ of gro~e or wllfull negligence on our pert. be liable or r®sponslble for any loss. coet~, dlLmage~ or expense~ Incurre~l or su~talr'4~cl by anyone resulting from any interpretation made by any of our officers, agent~= o~ smploye~, Thee~ Interpretation lu's al~o subject to our GeneraJ Terms and Conditions aa sd out In our current prtc~ ~chedule. E'ELL: P1-O5/J7 ST ~1 (1458~, FSL & 697' FEL, SEC , T12N, R14E) HORIZOflTAL PROdECTIOII 6OOO 4O0O 20O0 -2000 -4OOO -80OO SOUTH -8000 -4000 SCALE = I / 2000 IN/FT -~..,..,..i ......................... ..... ~...i...!...~ ...... ~+.~-.! ...... i.-.!..-i...?..~...~...i..+..~ ...... ~...~...i...~ .... i...~..~...~ .... !---!-.-!---i .... i-i'-!"! ~..i.-i-i .... i.i--.i-.~ ...... i-..!--'i...i ..... !--'!'..i.--i ...... i--i..!-.-i .... i: i i ?i i'i ?i':' '[ i"i i "i'[i! 'i"i i"!· ''~ ~ ~ : ~-~.?~ ...... i i i !.-!..i.!...i ..... !-!-!-i ..... !---i-i--i.- i !..i...! ..... ;--!-i.~ -: i.i !.. i i i ! : . .... : , , ,-., . ,. .... -,, ,-,.. i.~.; ~. i i i · i i ~ i i.i i i .i i i i .~..i f.i .i.i..~ i .... i..i..f i .i..i.i i :i : :'::::i ,::.: :::: .:: .... ~:t~--i--~.~ ~--~--:--~-i.i--i~ ..-:.~.,,.;~---~ ...... ~-i-i ..... ~-ii--! ..... !..~.i ...... i.-.i-.!.--~ .... !.--!...!...~ ...i...;...i.; ...... ;...~...~..:..ii.[[ i'i!!) ,!!! !:~I'~! .! [; ,,i, : :i,i ~, ~:.: ~..~ iii' i, i::: !:i · i "!i'::'i' !- ; ,!!i ii-!! i-.~.;: i..;-;-i-i-.i.--i--.i .ii..-!-.~ .... !--.i...i.-.i ...i .... i!.~ .... ;...i~ .... , f-" ~,~ [?~i'r~ :-! i ; i-i i.; ;.i- .; ................................... i.: ! · . : ; i i-- ! ! ! ; -: ; ; :: ! : ! ! i ; '' !i , ; ; i ; i i i i i ; ;..i...;..i i..; i i i i ; i : , -- . ! . -- , [.: ]'' :. .:! :: . ' ' :'~' "~ ' ; : i ' : ' ' ' i : ;" ' : ' i'i ' ' ! i ' : !':': :'i !'i ; ' i ~ i'!"i': .... :'"!":'!' "! i :'~'i"' : · :t ....... i ........ : ,.: : . . : . . . ] . . : ~.l ; : : i ..... ]...;...;.;...i .... : .... ; . .. [., , i .... ' :-; i ' ~.. il .... ~ .... : .... ' i ...... :.: ;. :!.i!..: ;;: i.. i. . ' ' i .... i : i' : ! : .... i '"i' "!' 'i':': : ; ~ ' ; ! ; i ;"!":"i" i"! !'~ ~-'!"!-'-~ ...... !'"!'"i'"i .... !"!'"!'"i ...... ::. :!::~:...::ti :tt:z~! ,..l..; ...i...: t i :.7.ii ..; itl .... i..i...i...; ..... i...i..i.!...i..L;..;~.~.~,~~: ;. i~ · ~ ~: -~: ..... ~- :..-l~~~e~i~ T';:i::'i:"i:'i-':;::i:: !:;' ::il !. , .... t ' , ' · ' : ..... , · ,-, - ' , .... · . ! , · , : .... ~ ~~; .... .,'1 i ....... : : ,..~ ..... , .i. ' . '.~:' ' '.: ~ ~..: !'!'~"'!'""!'"I ...... !'"!'"'"'~ .... :'"'!!'"!"iI'! ...... I'-!-!! .... !":'!~ !'!!'~i!"'?!! .... !-!"!'! ...... ! !'"1 ..... !'7"! !"!"!-! .... !!~ ' ':' ' ' 1' -- ':ii ..i ! i ~.i.!.~ ~..i...i...i ...... i...i...i...;..i.i i.! ~ i : :.~ .: ,~ i , , i , ~.~.i .... : ~.: i : i i : ; , . : ~ ~ ,.: i.i..i ~ .... ~.: ~ ~ :.. i i 1 · -2000 0 2000 4000 6000 8000 10000 12000 WEST FAST ~'ELL: P1-O5/J7 ST #1 (1458' FSL *& '697~' FEL, SF?'~6, T12N, R14E) YERTICAL PROdE£TIOII -40OO -C~300 0 0 20OO 4OOO 6(XX) 80(X) 1000~ ........................ i!.~.i .... i..i.*-!--i ...... i--.!---i.--i ...... i.--i---i---i-*.-i..i-.i..i .i--!.i-.-! .... i!'-ii' 'i!'i'i i!-i~*'-ii-"ii i-'i-!---i-'i'-i"-i'-i .... i'"!"i-'-!- i.!'i~ ~;~; .i~i,. !ii"!'ii'i*'i'"!"! ...... !'"i'"h'!"'!'"!"!"*!~!~"*!"!'"}'"i"l'i'i"i'"i ..... }"i'ii"*i"¢';i'"}'}"i'! "!'"i'!'"i .... i"'!"i .... i"i'¢'"i i';';; ;!;: :~---i!-i-!--}--i---,---i-i---i--! ..... !-? .... i-~'i~:-3~'--','-!-!--i-'-!--:'ii'-!--! ...... i---!'--? .... ?}'-i-"} ..... i-'-!---i"*i ...... i"i"-?! ..... ?--i'-'!'-'!'--!'}~i ..... : ; ; : ; i i i ..i i ;..i i-! i i .: ~ ; ; F,.i i ; ~ i i..i ~ i i.i..i ..i.~..i i..,.i i i i...i.i..i i ..i.i..i...i ..i.i.;.' i : i ; ' ' · . : : : .... ~ -:-: : : : : : : ; ; i ; ; i ; i ! ; i i ! .......... .... :::: ii}} .i}~!..~}}.}.; ;.!~.! ~i.!.! .~.~,i.i!i ~i~a..i.l.i..i.!..i.i i..i.i.i .... !..i.i..i ..... i..i..Li~ .~:~: ...... .................... ::.: :::: :::: :::: :::: : . ;~! ~.!-!---!---i.-!!-~ :!:~ -!~-~,,-~;~ .!-~-~..,.~:-i-.:..~-~.~--~.--~-.~...i .... i.:i--~ ...... ~..*h~.~...~-i..i..: ....... -. : .- !::i:,i! ' :::' i: ~ii: : :!- i i i i i.i..;..i i ;.; i .~. i ~ ~ i, ; ..~-i i i i ~ ~ ; i i ; : .i !..,i i .i..~ :..i...i..;.!.;..Li.i..i .... ;.~.i.; . : : ..... : : . ~ : : : : · . : , . i : . i : i · : i · i ~ i ~ ~i,~ : ! - : . i i i ! : ...... , ......... ~.i ...... i..;...~..i.~,i~ .... : ......... : ........ i...;._i.,,~ ...... i..i...;...i .... ~,.ii..~ ..... i...i...:...~_-...i..i..+.} ..... i...i._i...i ..... ~..,i..,i...; ...... i...i...i...~ · · - · :: :::: :::: .... :'' i .... : ~ i i'1 i "! ....... !-'i"'i'!'~ !! i"i'~;:!' '! ....... !"-! ........... i ...... !-i-.-! ..... i ..... !"'i"'~i~;"i i'~ ~'"i ...... !"i'"i'"! .... ! i ': ~: ~ ''~ "' !' :!-'i: i':-~:-'-! ..... i"?':"'--m ..... :'i'"i ..... i'i"i"i"'"'~'i'i'! ..... i'i"i'~"'7;;'"!"I'"i':'"!'i ..... i"i"i'"?~'-:~'!"~l~o~"'i"!i ...... .;ll;i: ..... ~.. ~.; : :. :.~ ~ ....... ; ;.~} ; ..... ; ,.: ;..~ ~ . . :..:.~.~.~ ~..~..'~. . . . .... ~ ~i~('''~;~ ~';';; ~'::' : ·: =: ~ :;:' : ' . ............. . . : : . : .. ; : . . . ; . ,...: ...,.:.: :...; : :..:..~ . . : ..... : . .; ............. / · . ~:- . ..~::- ::;: .... : . : :: ~:~; :: : . . . -: : ; .~.~..~...~ ..... h..i...~..; ..... L.; ~.;...~ ~ h.~ .... ~.~.~.~ ...... ~.;.; ;.. ~ ~ ~..~. ~ ; ;.; .;.~..;.~ ..... ,..; ~ , ..i ~...h.~ ~ ; ; .... '::: ;.~.~.--i ..... ;..i---~.;.. ; ....... ; ...;;-;;..-;...~-;.~ .;~.;-; :.;; '::;..;. ;.;.;~ .... ;:.; .:..;;.; .;.::. . · . ~ : : . .... :.;~ ];:~ ;~: : :.: ..... ~ ~... : : ( ....... . . : ..... : ..... ...... ............ , ...... :: :::: -:.:~::. :-:~-~--~-~--~ ...... ~---[---F--~ .... :~-:--:---~.-:F7 .... F-}~-~-,-~-~:.-~:}:--}.~-h.-~-.-:,~--~ ...... :-.-:-~ ::' : ~ : ~.~ ~..; ...... ~..~...~..; ~.: : :.: .;.; ~.~ .... ~.: ~.~ ;.~ ~..; .~ ; : ~ ;.;.;.~ .... :.: ; ; ..~..: : : ........ ; :.~ ..' · . .. . :::: : .... :;..:..,..,.,...,.., ..... ~ ..... .... ....... ~ ..... ..... ......, :';'; ';': ; ;'";::' ...... ..... ~ '1=-=~';'';~';e~ ~: ;;'" ...... ' .... ~ ............ ' ..... ;; ...... ;;' ' ~ ' : ~ ~' ~ ...... 120(X) PROJECTION ON VERTICAL PL.AJ~IE 265.00 85.00 ~CALED IN VERTICAL DEPTH~ HORIZ ~AJ_E = I 2000 IN/FT ARCO Alaska, Inc. iisburne/Point McIntyre Enginem Date: Subject: From: To: August 19, 1993 Transmittal #350 ARCO Alaska Inc. Bob Crandall AC)GCC 3001 Porcupine Drive Anchorage, AK 99501 The following Point McIntyre data are enclosed. " This information is confidential and your cooperation in maintaining confidentiality is appreciated. Log Well Title 1blue line, I sepia Pl-Gl-'Perforating Record Run # 1 Run Date 7/4/93 Company Schlumberger :P1-04 -Z-Densilog Compensated Neutron -GR P1-04-Dual Laterolog, GR / SP ,k~$~' P1-04~ Borehole Profile P1-04-Sub-Sea Vertical Depth (Single Shot Data) P1-04-Cement Bond Log e '~- P1-04-'Cement Evaluation Log (CET) ~1-04-Gyro Continuous Survey (GCT) I 5/22/93 Altas I 5/22/93 Atlas I 5/22/93 Atlas I 5/22/93 Atlas 1 6/12/93 Schlumberger 1 6/12/93 Schlumberger I 7/28/93 Schlumberger P1-05- Segmented Bond Log, Gamma Ray -CCL P1-05-, Cement Bond Log-CBT w/Jewelry P1-05-' Cement Evaluation Log-CET w/Jewelry P1-05-Gyro Continuous Survey-GCT I 7/11/93 I 8/12/93 1 8/12/93 1 8/12/93 Atlas Schlumberger Schlumberger Schlumberger P1-13 Pl-13 P1-13 P1-13 P1-13 P1-13 'P1-13 -"Neutron Poro, Density Poro, GR -MD ,x-t% --Neutron Poro, Density Poro, GR -TVD ~'~" --Dual Prop Resis, GR -MD 2~ ~,'Dual Prop Resis, GR -TVD 2~" 5-7 6/2-6/93 5-7 6/2-6/93 5-7 6/2-6/93 5-7 6/2-6/93 -Dens Poro, Neu Poro, Dual Prop Resis, GR-MD 5-72e$ 6/2-6/93 ~'~Dens Poro, Neu Poro, Dual Prop Resis, GR-TVD 5-7 ;.~ 6/2-6/93 wBulk Density, Gamma Ray -MD ~" 5-7 6/2-6/93 BakerHughes BakerHughes BakerHughes BakerHughes BakerHughes BakerHughes BakerHughes Pl-14-Engineering Parameters MD 2'~ ~ P1-14 - Pressure Data Log Pl-14--Formation Evaluation MD ~." '~1~-.'~t, Pl-14 -- Formation Evaluation TVD bz~--~t~8 - 2/26-3/6/93 - 2/26-3/6/93 - 2/26-3/6/93 - 2/26-3/6/93 Exlog Exlog BakerHughes BakerHughes PLEASE SIGN ONE COPY AND RETURN Transmittal #350 (AOGCC) Log (contd.) Well Title 1 blue line, 1 sepia Pl-16 -' Engineering Parameters MD [Pl-16.~Pressure Data Log ~Pl-16~Formation Evaluation MD ~Pl-16,,-Formation Evaluation TVD II Run .# P1-17-Bulk Density -Gamma Ray -MD ~' Pl-!7---Dual Prop Resis -GR-MD 2t5" P1-17/Dual Prop Resis-GR-TVD ~4'5 * Pl-17--Dens Poro, Neutron Poro -GR -MD %.+~tt P1-17-Dens Poro, Neutron Poro -GR -TVD ;.,'rS ~' 5,SRR 5,SRR 5,SRR 5,SRR 5,5RR Pl-!7-'EPmsPoro, NeuPoro, DualProp, R~SsKlR-MD ::~" 5,SRR IPl-17- ~_nsPoro, NeuPoro, DualProp, ResisKiR-WD 1+~" 5p-RR Run Date 3 / 19-28 / 93 3/t9-28/93 3/19-28/93 3 / 19-28 / 93 4/1'4-16/93 4/14-16/93 4/14-16/93 4/14-16/93 4/14-16/93 4/14-t6/93 4/14-16/93 Page 2 Company Exlog E,-dog BakerHughes BakerHughes Baker Hughes Baker Hughes Baker Hughes Baker Hughes Baker Hughes Baker Hughes Baker Hughes Diskette/Tape (w/verification) Wet1 Tide Run # \P1-04 q~--'~ P1-13 q ¥-,5% P1-16 Final MWD Survey b/61~_ - DLL/CN/ZDL/GR in LDWG Format 1~- Final MWD Survey bt~.~ - Dual Prop Resis, Neutron, Density, GR'~ ~,¢/4~ o~4 6 5,SIqR q%-6~ P1-17 Dual Prop Resis, Neu, Dens, GR -Depth Shifted Run Date 3/24/93 5/22/93 6/11/93 3/29/93 4/16/93 Company BakerHughes Atlas Sperry Sun BakerHughes BakerHughes Please sign ___ and return to: Transmittal #350 Laura S. Lahrson, ATO-409 ARCO Alaska, Inc. P.O. BOX 100360 Anchorage, Alaska 99510-0360 PLEASE SIGN ONE COPY AND RETURN MEMORANDUM STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION to: David W. Johnst.~ Commissione]::;;~ thru: Blair E Wondzell Petr lnsp Supervisor from: Jo n~Spaulding Petr Inspector date: July 15, 1993 file: 061893.doc sub)ecl: BOP Test- Pool 7 ARCO Well P1,05 Point Mc!ntyre Unit PTD 93-87 Friday, June 18, 1993: I traveled this date to Pool 7, ARCO Point Mclntyre Unit~to witness a BOP test. There were three leaks. A leak on the kill line was repaired with a new spool piece, a leak on the choke line was repaired by replacing an APl ring, and a leak on the choke valve was repaired by replacing the gates. Summary: Witnessed BOP test on Pool 7; 3 failures, 12 hours. attachments STATE. OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report Ddg Contractor:. Operator. /-/~-- ~ - Well Name: ~/- ~ ~- Casing Size: /~ -~/¢ ~ Set t~ ~/~Z G Feet Test Initial Weekly ~ Other Rig No. DATE: P'rD # R' Rep. ~.~7-, ,4~ . ,~,~'~'~ Rep. Z-c~,-~' /~,~/C ~on:Sec. /~ T. /~R. MISC. INEPECTION8: ~-. FLOOR ~ VALVE~: Quart. Pressure P/F Location Gen.: / Well Sign ,,-"' Upper Kelly / I.~o/_~ ~ ~ I /'~ Housekeeping: ~/ (Gan) Dd. Rig ,,/ Lower Kelly / Reserve Pit ,~//¢ Ball Type / I~-oo/~o Test BOP STACK: Gu~. Pressure P/~ CHOKE MANIFO~: Ann. Preventer ~'/ No. Valves /~. Pipe Rams No. Flanges Brmd Rams Manuel Chokes Chk/Ln Valves Hydraulic Chokes I..~a/,~..~ HCR Valves ICdl Line Valves ? ACCUMULATOR SYSTEM: Check Va, System Pressure ~,~ ~:~ I,/p Pressure Alter Closure I~UD SYSTEM: Light Nerm 200 psi Altained After Closure minutes Trip Tank System Pressure Altained Pit Level Indicators Blind Switch Covers: Master: Flow Indicator '. Nltgn. BIJ's: ~ E,4, . ' Gas Detectors , . ~, ~/c) ~ Psig. ~~ ~'~::~!'!~'!'"~:::::::'?' ::'":"": :~:!~:~;~:.:::.::...:!:!.~:;..::~::.?!~..:~.::.:::::~..v..:~..~:.::::.:::!~!~...~...!:!:i.?:~:~:~::::::::::~.:F:~:~?!~!i~~ ~!!!!~'~:G~ ' ti,'.' r~'*'TIF" Number of Failures .~ TestT'~e /~D__Houm Numberofwlveste~ed ~ RepeirorReplecamentofFeiled Equipment ~hall be m~le within '~ 'del~. Notify the Ir-.,pector on duty end follow with Written or F~xed verification to the AOGCC Commission Ofr~,e at: Fu No. 27~.7~42 In~peeter North Slope Pager No. If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 Distribution: ofig-Well File c - Oper./Rig c - Database c - Trip Rpt File c - Inspector STATE WlTN/.~ REQUIRED? YES NO 24 HOUR NOTICE GIVEN YES / .... NO Waived By:. Witn~ By:. FI-021L.XLT Rev. 1/93 ALASKA OIL AND GAS CONSERVATION COMMISSION June 11, 1993 Michael Zanghi Drilling Engineer Supervisor ARCO Alaska, Inc. P O Box 196612 Anchorage, AK 99519-6612 WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 Re: Prudhoe Bay Unit P1-05 ARCO Alaska, Inc. Permit No: 93-87 Sur. Loc. 1458'NSL, 697'WEL, Sec. 16, T12N, R14E, UM Btmhole Loc. 2245'NSL, 1780'WEL, Sec. 14, T12N, R14E, UM Dear Mr. Zanghi: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill dOes not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. , Sincerely, Commis s ioner BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. printed on recycltd paper STATE OF ALASKA ALASKA t.,,- AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.OO5 Re-Entry [] Deepen1-1! Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. KBE = 50' feet Point Mclntyre 3. Address 6. Property Designation P, 0. Box 196612. Anchorage. Alaska 99519-6612 ADL 34624 4. Location of well at surface 7. Unit or properly Name 11. Type Bond(~,o 20 sc 2~.o~s) 1458' NSL, 697' WEL, SEC. 16, T12N, R14E Prudhoe Bay Unit At top of productive interval 8. Well number Number 2173'NSL, 2456' WEL, SEC. 14, T12N, R14E P1-05 U-630610 At total depth 9. Approximate spud date Amount 2245'NSL, 1780' WEL, SEC. 14, T12N, R14E 6/13/93 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth(MDa,dTVD) !property line : ADL365548-3035' feet P1-O4-13'@650'MD feet 2560 13825'MD/9211'TVDfeet 16. To be completed for deviated wells 17. Anticipated pressure (s~, 20 AAC 25.0-~s Kickoff depth ~oo' feet Maximum hole angle ~4 o Maximum sur~ac~ 3330 pslg At total depth (TVD) ~0¢'/4390 18. Casing program ~ Setting Depth s~ze Specifications Top Bottom Qdantit¥ of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.5# H-40 Weld 80' 41' 41' 121' 121' 280 cu ft Arcticset (approx.) 13-1/2" 10-3/4" 45.5# NT-80 BTC 4146' 41' 41' 4187' 3550' 2684 cu ft PF "E"/406 cu ft "G" 9-7/8" 7-5/8" 29.7# VTS95HS NSCC 12709' 41' 41' 12750' 8422' 9-7/8" 7-5/8" 29.7# 13CR80 NSOC 1075' 12750' 8422' 13825' 9211' 801 cu fl Class "G" 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing. Length Size Cemented Measured d, ept,~, %, ~; ~: True-"V.'ertical depth Structural ,i,.~. ;.., 'i~.i'i, '- ~ ':';/ :"'-' i~ ! Conductor Surface , i ;.-,~ .. /i Intermediate ;~(;~"~ ' -"' Production ~\~;,o;,~.~ L.:Jt ~¢,.: G~(; r'.,- .... ¢', ,-',~";~'~5 Liner -. Perforation depth: measured true vertical 20. Attachments 'Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[] Drilling fluid program [] Time vs depth pict [] Refraction analysis r-I Seabed report[] 20 AAC 25.050 requirementsl-] 21. i hereby certify that the/~oregoing is true and correct to the best of my knowledge Si,ned H, ~.~~--/' CommissionTitleDril/in~/En~lineerSuperviS°ruse Only Date '~ ¢¢;~ Permit Number IAPI number IApproval date ~.;,¢;~ See cover letter ~'-~-<~7 !50'~'2'¢- 'Y- 7'Z-'~?u¢ ! /t3'~// -" 7'~_~ for other requirements Conditions of approval Samples required [] Yes ~[} No Mud T~g required []Yes J[ No Hydrogen sulfide measures [] Yes ~ No Directional survey required .1~ Yes [] No Required working pressure for BOPE []2M; 1-13M; 1~5M; I-]10M; 1-115M; Other: / LIR~,NAL SIGNED BY by order of / Approved by ~, - Commissioner me commission Date~ ..,~SSELL A. DOUGLAb'~ Form 10-401 Rev. 12-1-85 Submit in triplicate [Well Name: [P1-05 Well Plan Summary Type of Well (producer or injector): I Producer Surface Location: Target Location: Bottom Hole Location: 1458' FSL and 697' FEL Sec 16 T12N R14E 2173' FSL and 2456' FEL Sec 14 T12N R14E 2245' FSL and 1780' FEL Sec 14 T12N R14E I AFE Number: 12C0025 I I Estimated Start Date: 16/20/93 IMl): I ~3,825'1 I Well Design (conventional, slimhole, etc.): I Rig: I Pool #7 I I Operating days to complete: 122 I TVO: 192~' I I~g: 150 [ slimhole /longstring Formation Markers: Formation Tops TVDss MD West Sak 6700' 9635' K-10 8186' 12546' Stump Island absent absent K-5/HRZ 8640' 12938' Kuparuk 8668' 12986' GOC n/a n/a Miluveach 9073' 13675' Casin~g/Tubin Program: Wt/F Hole Size- Csg/ - Wtf'Ft Grade Conn Length Top Btm Tbg O.D. 20" 91.5 H-40 WELD 80' 41' 121' 13.5" 10.75" 45.5 NT-80 BTC 4146' 41' 4187' 9.875" 7.625" 29.7 NT95HS NSCC 12709' 41' 12750' 7.625" 29.7 13CR80 NSCC 1075' 12750' 13825' n/a 4.5" 12.6g 13CR80 TDS 12809' 41' 12850' Well Plan Summary ..-.JtJN '- 4 159:~ Alaska Oil & Gas Cons. Cornrnissior: Anchorage Page 1 Logging Prog Open Hole Logs: I Cased Hole Logs: ram: GR/Resistivity/Neutron/Density: Top of W. Sak to TD w/MWD Gyro Cement Bond Mud Program: Surface Mud Properties: I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.7 300 40-60 30-60 60-80 9-10 15-25 to to to to to to to 9.5 100 20-40 15-20 20-30 9-10 15-25 Intermediate Mud Properties: I N/A Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss n/a Production Mud Properties: I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.5 35 15 5 10 9 5 to to to to to to to 10.0 45 20 15 20 10 10 Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Directional' · I goP: l ~00' ~m / zW [ Maximum Hole Angle: 1 54 Close Approach Well: P1-04. PM 1, PM 8, PM 4 Well Plan Summary Alaska_ Oil & Gas Oons. (:;om~-[~issio~'~ Page 2 . , , , , , . , , P1-05/J7 Operations Summary MIRU drilling rig. Spud well and drill 13-1/2" hole to 4187' md/3550' tvd building angle to 54 degrees. Set 10-3/4" casing and cement same. Test casing to 3000 psi for 30 minutes. Nipple up BOPs and test same to 5000 psi. Pick up 9-7/8" BHA and ddll 10' of new hole and perform leakoff test. Continue drilling to 13825' md / 9211' tvd. Log with MWD. Set 7 5/8" L-80 and chrome casing and cement same, displacing with seawater. Test casing to 3500 psi for 30 minutes. Run 4-1/2" chrome tubing completion and tree. Displace tubing to diesel and freeze protect well with 2000' of diesel in annulus. Release rig. Run cased hole logs: cement bond log, gyro. Sudace Casing Depth: Surface Casing Size: Surface Casing Weight: Bit Diameter: Excess Factor Intermediate Casing Depth: Intermediate Casing Size Intermediate Casing Weight: Proposed Top of Cement Bit Diameter: Excess Factor: PI-05/J? Cement Volumes Surface String 4187 10 3/4 45.5 13.5 2 LEAD (TYPE "E" PERMAFROST) Yield 2.17 Density 1 2 #sacks 1237 (2684Cu. Ft.) TAIL (CLASS G) Yield 1.16 Density 15.8 # sacks 350 (406 Cu. Ft.) TOP JOB (TYPE "C" PERMAFROST) # sacks 250 (235 Cu. Ft.) .94 cuft/sx 15.6 ppg Production String 13825 7 5/8 29.7 11986 9 7/8 1.9 LEAD Yield 1.98 Density 1 5 # sacks 0 # bbls 0 TAIL (CLASS G) Yield 1.2 De nsity 15.8 # sacks 6 68 # bbls 1 43 ( 0 Cu. Ft.) (801 Cu. Ft.) HORIZONTAL VIEW SCALE 500 ft. / DIVISION. ..... . SURVEY REF: WELLH-EAD N -o5 ----m- 7' 625 I]D,~ _ ~-~ 10 r~ .750 OD, 8 4187 ND, 3550 TVD ~ mo ~o ~-- VERTICAL VIEW SCALE 1000 ft. / DIVISION TVD REF: RKO VERTICAL SECTION REF: WELLHEAD TIE 1N TARGET, START OF BUILD 8 [.00 DEG/[O0 FT · TARGET, START OF BUILD 8 1.50 DEG/iO0 FT TARGET, START OF BUILD @ 2.00 DEG/IO0 FT END OF BUILD 1218 10.750 OD, ~ 4187 MD, 3550 TVD 1788 T-8 $ I3o.o7 deg. E~st Declination CASING POINT DATA OD MD Inc Azi TVD North East 10.750 in. 4187 54.03 85.35 3550 138 1700 7.625 ~n. 13825 54.03 85.35 9211 771 9475 CRITICAL POINT DATA MD Inc TIE [N 0 0.00 TARGET, START 500 0.00 OF BUILD ~ 1,00 DEG/IO0 FI TARGET, START [000 5.00 OF BUILD 8 1.50 DEG/iO0 FI TARGET, START 1500 12.50 OF BUILD 8 2.00 DEG/iO0 FT END DF BUILD 3577 54.03 10.75' CASING P~187 54.03 T-8 4289 54.03 WEST SAK 9635 54.03 K-10 ]2546 54,03 K-5 / HRZ ]2938 54.03 TARGET / ]2986 54.03 KALUB[K / KUPARUK HILUVEACH 13675 54.03 TOTAL DEPTH / 13885 54.03 7.625' CASING PT 0 O0 0 00 85 35 85 35 85 35 85 35 85 35 85 35 85 35 85 35 85 35 85.35 85.35 TVD North East 0 0 0 500 0 0 999 2 88 1493 8 97 3198 98 1208 3550 138 1700 3610 145 1783 6750 496 6095 8460 687 8444 8690 713 8760 8718 716 8798 9123 761 9354 9211 771 9475 BHL DATA J TVD9211.10[ MD 13825.21I VS 9506.76[ NorLh 771.02[ East 9475.441 Date PLotted Created By Checked By Approved By Date 6/4/93 6115 8472 8789 8887 9385 VEST SAK I I I 0 1000 2000 3000 VERTICAL SECTION PLANE: 85.35' 9507 TOTAL DEPTH 7.625 DB, e 13825 HO, 9211 TV[ 4000 5000 6000 7000 8000 9000 [ 0000 I-' 1 --U.D P -O5WPP T~,ovelling C ,der' - Leost Dis~once ReFerence ~/ell - PI-O5WP2 TVD 0 - 9Pll Ct. Interval, 50 Ct, All I}Pec±ions l~el ±o T~ue No~±h 06/03/1993 4:25 240° i~Oo PI-01/R47 PI-01/R'47 PI - (~/Pt'O P 1-0~'/PI. FJ PI-~ PI-~ ' ~1~ PI-~ PI-~ ~ Pl-07~ PI-~ PI-~ PI-~ PI-~I PI-~ PI-II~ PI-Il PI-I~II PI'I~II 11~ PI-I~ 1-14~ PI-Il 1-1~ PI-16 1-17~ PI-17 Pl-17m PI-17 PI-~ PI-~ Pl-~lq PI-~I PI-~I~ PI-~I8 Pl-Ol~ PI-Gl P~-~ P~ P2-12 ~-~ p~- P2-~ P~ ~:~t P~ P ~ P~31~ P~31 ~-~1 P~4~ ~ ~ P~ l ~4~ P2-48 PS-4~T P2-IQ Pg-~T P~ P~-5~T P2-51 P2-~T P2-~ P2-~IO P2-~lO P~ P~ P2-~ P~ P2-~13 P2-~13 P~OI~I P2-DI O.D~ST POJNgS CRITICAL POINT DATA MD ]nc Az{ TV]] Nc~(h Eos~ T]E IN 0 O.CO 0.00 0 0 0 TAI~uEI, START 500 0.00 0.00 500 0 0 CF ]AJILD R 1.00 DCG/{O0 rT TAR'E~ 1, START iCO0 5.00 85.35 999 2 22 ElF BUILD P 1.50 DEG/{O0 FT TARGE1, START ~00 12.50 B~.~ 1493 B 97 EF ]3UILD ~ ~.00 DEG/{O0 FT END ElF BUILD 3577 54.03 8~.35 319~ g8 ~08 10.7~' CASING PT 4187 54.03 E~.3~ 3~50 {~3 1700 T-8 4L~sg ~4.03 85.3~5 3GlO ~4~ ~783 W'EST SAK c)635 54.03 8~.35 6750 4c)6 6095 K- i 0 I ~--~46 ~4.03 8~.35 8460 687 8444 K-5 / H~Z l~g38 54.03 E~.3~ E~90 7~3 8760 TARGC1 / {~gSB 54.03 85.33 871B 7{6 87c)8 KALUBIK / KUPA~LK N]LUVEACH { 3675 54.03 85.3~ gl ~3 76i 9354 TOT/N_ [}EPTH / {3EL-~ 54.03 E~.3~ g~ii 771 c)475 7.6L:~' CAS]NO PT CHOKE WING HCR ~VANUAL ~cE'VO¥ 4. 1/~'-~0 TYPE E GATE VALVE 5/~'- 1 o, oooPs[ HUB X FLANGE ADAPTOR ':h HYDRIL 15 GK ANNULAR BOP LATCHED HEAD 15 5/8"-10,O00PSi HUB BOTTOM CONNECT/ON HYDRIL I3 5/8'- I O, O00PSI MPL RA~ BOP HUB CONNECTIONS 4 1/16'-10,000PSl SIOE OUTLETS H~DRIL ~,3 5/8'- I O, O00PSi /~PL RAM BOP HUB CONNECTIONS ~ 1/16"-I0,000P3I SIDE OUTLETS t~NUAL HCR LYNN INTERNATIONAL 3 ~/~ ~"-~o,ooo?s/ CHECK VALVE KILL WING BcEVO¥ $ 1/16"- 10, O00PSI TYPE E GATE VALVE HYDRIL 13 5/8'- 10, O00PSI MPL ~ BOP HUB CONNECTIONS 4 1/16"-10,000PSI SIDE OUTLETS BLOW-OUT PREVENTER PM RIG 7 · -'RUDHOE BAY DRILLING GROUP 20" DIVERTER SCHEMATIC POOL 7 FILL UP LINE FLOWLINE I I 20" 2000 PSI DIVERTER '10" BALL VALVE 10" BALL VALVE CONDUCTOR NOTE: ONLY ONE VALVE OPENS AUTOMATICALLY WHEN THE DIVERTER CLOSES. THE SECOND VALVE WILL REMAIN CLOSED UNLESS CONDITIONS REQUIRE THE USE OF THE SECOND DIVERTER LINE. THE SECOND' VENT LINE CAN BE REMOTELY OPENED TO ACHIEVE DOWNWIND DIVERSION. THIS IS A VARIANCE FROM 20AAC25.035. Oil ° ~ Gas Cons. Commission ;Anchorage ¢ nnrT~nnnnnnnnnnnnnl, ! r~nnn ~-.:m: ..-.:,,-.:m: ................................................ im STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 Porcupine Drive Anchorage Alaska 99'301-3192 Re: THE APPLICATION OF ARCO ) ALASKA, INC. for an order granting ) an exception to spacing requirements of ) Title 20 AAC 25.055 to provide for the ) drilling of the ARCO Pt. Mclntyre P 1-05 ) development oil well. ) Conservation Order No. 316 ARCO Alaska Inc~ ' Pt. McIntyre P 1-05 Development Oil Well May 25, 1993 · IT APPEARING THAT: o ARCO Alaska, Inc. submitted an application dated May 6, 1993 requesting · exception to 20 AAC 25.055(a)(3) to allow drilling the ARCO Pt. McIntyre P1-05 development oil well closer than :500 feet to a drilling unit boundary. . . Notice of hearing was published in the Anchorage Daily News on May 10, 1993 pursuant to 20 AAC 25.540. ' No protests to the application were received. FINDINGS: ,. 1. The ARCO Pt. Mclntyre P 1-05 well as proposed will be directionally drilled from a surface location 1458' from the south line (FSL) and 697' from the east line (FEL) of Section 16, T12N, R14E, Umiat Meridian (UM). The proposed target location is 2173' FSL and 2456' FEL of Section 14, T12N, R14E, UM and the proposed bottom-hole location is 2225' FSL and 1821' FEL of Section 14, T12N, R14E, UM. . Offset owners BP Exploration (Alaska) Inc. and Exxon Corporation have been duly notified. 4. An exception to 20 AAC 25.055(a)(3) is necessary to allow drilling of this well. CONCLUSION: Granting a spacing exception to allow drilling of the ARCO Pt. McIntyre P 1-05 well as proposed will not result in waste nor jeopardize correlative rights. Conservation Orde~No. 316 May 25, 1993 Page 2 NOW, THEREFORE, IT IS ORDERED: . ~ : ARCO Alaska, Inc.'s application for exception to 20 A_AC 25.055,for the purpose of drilling the Pt. McIntyre P 1-05 well is approved as proposed. · DONE at Anchorage, Alaska and dated May 25, 1993. ssion · Russell A. Douglass, Conm~sioner Alaska Oil and Gas Conservation Commission P1-05CMT.XLS State: Abd~,~ Engineer. Well: P1-05 Work Sheet: Field: PT. MCINTYRE Date: State Permit 1~ 93-87 £emen! Vo&,me Casing Type Casing Size Casing Length Hole DiameIe~ Cement- Sacks Cement- Yield Cement- Cubic It Cement- Cubic It Cement- Sacks Cement- Yield Cement- Cubic ft Cement- Cubic ti Cement- Sacks -Inches - Feet -Inches 111 111 111 111 112 112 112 112 113 Cement- Yield 113 Cement- Cubic ft 113 Cement- Cubic It 113 Cement- Cubic tt ! Vol Cement- Fill Factor Conductor Su~tace 20.000 10.750 80.000 4,146000 28.000 13.500 0.000 0. t300 0.000 0.000 0.000 0.000 280.000 2,684.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 406.000 0.000 0.000 0.000 0.000 280.000 3,090.000 2.325 2.049 Liner 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 ~DIV/O! Casing Type Casing Size -Inches Casing DeCh -Feet Hole Diamete~ -Inches Cement- Sacks 111 Cement- Yield 111 Cement- Cubic It 111 Cemer~ - Cubic ft 111 Cement-Sacks11112 Cement- Yield 111:I2 Cement- Cubic tt ~2 Cement- Cubic ft 112 Cement-Sacks113 Cement- Yield 113 Cement- Cubic it 113 Cement- Cubic It 113 Cement-Cubic it /Vol Cement-Ir~elval tt Top ol: Cement- Feet Intermediate 111 Intermediate 112 0.000 0.000 0.O00 0.000 0.000 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 tIDIV/O!. 11DIV/0!. 11:DIV/0! ttDIV/0! Production 7.625 13,825.000 9.875 0.00 0.00 0.00 801.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 801.00 3,729.86 10,095.1 Measured Depth State: Alaska Borough: Well: P1-05 Field: PT. MCINTY'RE St. Perm # 93-87 P1-05CSG.XL$ Date 6/8/93 Engr: M. Minder Casing Interval Interval Size Bottom Top Length lA 10.75 3550 41 4146 2A 7.625 8422 41 12709 SA 7.625 9211 8422 1075 4A 0 0 0 0 5A 0 0 0 0 6A 0 0 0 0 7A 0 0 0 0 8A 0 0 0 0 9A 0 0 0 0 10A 0 0 0 0 Description Description Description Tension Lbs Grade Thread Lbs 45.5 NT-80 BTC 0 29.7 NT95HS NSCC 0 29.7 13CR80 NSCC 31927 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Mud Hydraulic Collapse L'Vieght Gradient Gradient ppg psi/ft psi/ft 1B 9.5 0.494 0.394 2B 10.0 0.520 0.420 3B 10.0 0.520 0.420 4B 0.0 0.000 -0.100 5B 0.0 0.000 -0.100 6B 0.0 0.000 -0.1 O0 719 0.0 0.000 -0.100 8B 0.0 0.000 -0.100 9B 0.0 0.000 -0.100 1 OB 0.0 0.000 -0.100 Maximum Minimum Pressure Yield psi psi BDF 3330 3580 1.1 3330 8180 2.5 3330 6890 2.1 0 0 #DIV/O! 0 0 #DIViO~ 0 0 #DIV/O! 0 0 #DIV/O! 0 0 #DIV/O! 0 0 #DIV/O! 0 0 #DIV/O! Tension Strength K/Lbs K/Lbs lC 188.64:3 715 2C 409.3843 811 3C 31.9275 683 4C 0 5C 0 6C 0 7C 0 8C 0 9C 0 10C 0 TDF 3.79 1.98 21 .~ #DIV/O! #DN/O.! #DIV/O! #DIV/O! #DIV/O! #DN/0! #DIV/0! Collapse Collapse Pr-Bot-Psi Resist. (2)F 1399 ;~090 1.494 3537 7200 2.035 3869 4790 1.238 · 0 o #OlV/0! 0 0 #DIV/O! 0 0 #DIV/O! 0 0 #DIV'/O! 0 0 #DIV/O! 0 0 #DIV/O! 0 0 #DIV/O! ** CHECK LIST FOR NEW WELL PERMITS ** ITEM APPROVE DATE (1) Fee (2) Loc '[2 thru 8] [9 thru 13] [10 & 13] (4) Casg -~?-K'.~'~ ~ -~- [14 thru 22] · 2. 3. 4. 5. 6. 7. 8. 9. 10. 11, 12. 13. 14. 15. 16. 17. 18. !.9. 20. 21. 22. 23. 24. 25. 26. 27. 28. (5) BOPE ,.~.., ~, - - [23 thru 28] E29 thru 31] 29. 30. 31. 32. 33. eng i neet i nc;: MTM~ RAD BEW dD~/r~ <~,..,~_~ geo 1 ogy' DWJ RPC/ rev 12/92 jo/6.011 Company Lease & Well YES NO /~,, Is permit fee attached ............................................... Is well to be located in a defined pool .............................. Is well located proper distance from property line ................... Is well located 'proper distance from other wells ..................... Is sufficient undedicated acreage available in this pool ............. REMARKS Is well to be deviated & is wellbore plat included ................... /~ . Is operator the only affected party .................................. /~. .... Can permit be approved before 15-day wait ............................ ./~ .... Does operator have a bond in force ................................... Is a conservation order needed ........................................ Is administrative approval needed .................................... Is lease number appropriate .......................................... -~- Does well have a unique name & n~nber ................................ ./~ Is conductor st r i ng provided ......................................... . Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. Is enough cement used to circulate on conductor & surface ............ Will cement tie in surface & intermediate or production strings ...... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension, and burst. Is well to be kicked off from an existing wellbore ................... Is old wellbore abandonment procedure included on 10-403 ............. Is adequate wellbore separation proposed ............................. Is a d iverter system required ........................................ Is drilling fluid program schematic & list of equipment adequate ..... Are necessary diagrams & descriptions of diverter & BOPE attached .... Does BOPE have sufficient pressure rating -- test to ~~ psig ..... Does choke manifold comply w/API RP-53 (May 84) ...................... Is presence of H2S gas probable ...................................... FOR EXPLORATORY & STRATIGRAPHIC WELLS: Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Name and phone nL~nber of contact to supply weekly progress data ...... Add i t i ona 1 requirements ............................................. Additional INITIAL GEOL UNIT ON/OFF POOL CLASS STATUS AREA .~ SHORE UM . ~IERIDIA~J' SM Exp/Dev E]~=J. TYP~: Redr i 1 I Inj Rev remarks' 0 --t -rz u'~ --I Z Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. ALASKA COMPUTING CENTER * SCHLUMBERGER COMPANY NAME · ARCO ALASKA INC. WELL NAME · P1-05/J7 ST#1 FIELD NAME : POINT MCINTYRE BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 50-029-22378-00 REFERENCE NO : 93306 RECEIVED OCT 1 4 199.~ Alaska Oil & Gas C~,, LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-SEP-1993 14:30 **** REEL HEADER *~** SERVICE NAME ·EDIT DATE · 93/09/23 ORIGIN : FLIC REEL NAME : 93306 CONTINUATION # : PREVIOUS REEL : COMMENT ' ARCO ALASKA, INC., PT MCINTYRE, P1-05/J7 ST#l, 50-029-22378-00 **** TAPE HEADER **** SERVICE NAME ' EDIT DATE · 93/09/23 ORIGIN : FLIC TAPE NAME : 93306 CONTINUATION # : 1 PREVIOUS TAPE : COMMENT ' ARCO ALASKA, INC., PT MCINTYRE, P1-05/J7 ST#l, 50-029-22378-00 TAPE HEADER POINT MCINTYRE UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA BIT RUN 1 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 93306 JACKSON 1ST STRING 2ND STRING P1-05/J7 ST#1 500292237800 ARCO ALASKA, INC. SCHLUMBERGER WELL SERVICES 23-SEP-93 BIT RUN 2 BIT RUN 3 16 12N 1 4E 1458 697 50.00 50.00 9.00 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 9.875 10.375 4260.0 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 3RD STRING PRODUCTION STRING REMARKS: 23-SEP-1 993 FIELD ENGINEER'S REMARKS: ********** RUN 1 ********** BIT TO RES 16.24' BIT TO GR 26.66' BIT TO NEU 88 43'' , BIT TO DEN 81.45' WASHDOWN INTERVAL 12470' TO 13825' DOWNHOLE SOFTWARE V4.0C. NO MWD DATA WITH THIS LOGGING RUN. $ **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION ' 001C01 MAX REC SIZE · 10 FILE TYPE : LO LAST FILE : 14:30 PAGE: FILE HEADER FILE NUMBER: 1 EDITED MERGED MAD Depth shifted and cl~pPCd curves; DEPTH INOR M T 0. 5000 FILE SUMMARY PMU TOOL CODE START DEPTH all bit runs merged. STOP DEPTH MWD 12470.0 13825.0 $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH MWD 88888.0 88887.0 13609.0 13608.0 13584.0 13583.5 13457.0 13456.5 13249.5 13248.0 13225.5 13224.0 13210.5 13208.0 13166.0 13164.0 13009.0 13006.0 12989.0 12985.0 12975.5 12971 .5 12947.5 12944.5 12921 .0 12917.0 12913.0 12909.5 12905.5 12899.5 LIS Tape ~erification Listing Schlumberger Alaska Computing Center 23-SEP-1993 14:30 12861 .5 12791 .0 12671 .5 12658.5 100.0 $ MERGED DATA SOURCE PMU TOOL CODE 12854.0 12782.5 12663.5 12650.5 92.0 BIT RUN NO. MERGE TOP MERGE BASE $ REMARKS: THE DEPTH ADJUSTMENTS SHOWN ABOVE REFLECT MAD GR TO WIRELINE CET/GR OF 12-AUG-93. ALL OTHER CURVES WERE CARRIED WITH THE GR SHIFT. UNSHIFTED DATA IS IN FILE #2. NO DRILLING DATA EXISTS WITH THIS LOGGING RUN. $ LIS FORMAT DATA PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 56 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 18 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE PROCESS ( HEX ) DEPT FT 00 000 00 0 1 1 1 4 68 RHOB MAD GJC3 00 000 00 0 1 1 1 4 68 DRHO MAD G/C3 00 000 00 0 1 1 1 4 68 0000000000 0000000000 0000000000 LIS T~De Verification Listing Schlumberger Alaska Computing Center 23-SEP-1993 14:30 PAGE: NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE PROCESS ( HEX ) PEF MAD BN/E 00 000 00 0 1 1 1 4 68 CALN MAD IN 00 000 00 0 1 1 1 4 68 NPHI MAD PU-S 00 000 00 0 1 1 1 4 68 RA MAD OHMM 00 000 00 0 1 1 1 4 68 RP MAD OHMM 00 000 00 0 1 1 1 4 68 DER MAD OHMM 00 000 00 0 1 1 1 4 68 ROP MAD FPHR 00 000 00 0 1 1 1 4 68 GR MAD GAPI 00 000 00 0 1 1 1 4 68 NCNT MAD CPS 00 000 00 0 1 1 1 4 68 FCNT MAD CPS 00 000 00 0 1 1 1 4 68 GRCH CET GAPI 00 000 00 0 1 1' 1 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 ** DATA ** DEPT. 13824.000 RHOB.MAD -999.250 DRHO.MAD -999.250 CALN.MAD -999.250 NPHI.MAD -999.250 RA.MAD -999.250 DER.MAD -999.250 ROP.MAD 77.255 GR.MAD -999.250 FCNT.MAD -999.250 GRCH.CET -999.250 DEPT. 12371.500 RHOB.MAD -999.250' DRHO.MAD -999.250 CALN.MAD -999.250 NPHI.MAD -999.250 RA.MAD -999.250 DER.MAD -999.250 ROP.MAD -999.250 GR.MAD -999.250 FCNT.MAD 3.794 GRCH.CET -999.250 ** END OF DATA ** PEF.MAD RP.MAD NCNT.MAD PEF.MAD RP.MAD NCNT.MAD -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION ' 001C0} DATE ' 93/09 23 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE ***w FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION · 00}C0} DATE ' 93 09 23 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 23-SEP-1993 14:30 FILE HEADER FILE NUMBER 2 RAW MAD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH CDR 1 2470 . 0 1 3825 . 0 CDN 1 2470 . 0 1 3825 . 0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT/: BOTTOM LOG INTERVALj(FT)' ' BIT ROTATING SPEED (RPM) HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 09-JUL-93 FAST 2.3E V4.0C MEMORY 13825.0 12470.0 13825.0 TOOL NUMBER CDR CDN $ RESISTIVITY NEUTRON/DENSITY BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN)' DRILLERS, CASING DEPTH[~T) · BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/Q)' MUD VISCOSITY (S)' MUD PH: MUD CHLORIDES ~PPM): FLUID LOSS (~3): RESISTIVITY (OHMM AT TEMPERATURE DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: RGS059 NDS049 9.875 4260.0 10.30 0.338 0.246 SANDSTONE 2.65 66.0 58.0 PAGE: LIS_Thpe Verification Listing Schlumberger Alaska Computing Center 23-SEP-1993 14:30 HOLE CORRECTION (IN): TOOL STANDOFF IINI' EWR FREQUENCY HZ REMARKS: 9.875 1.7 FIELD ENGINEER'S REMARKS: ********** RUN 1 ********** BIT TO RES 16.24', BIT TO GR 26.66' BIT TO NEU 88.43', BIT TO DEN 81.45' WASHDOWN INTERVAL 12470' TO 13825' DOWNHOLE SOFTWARE V4.0C. NO DRILLING DATA WITH THIS LOGGING RUN. $ LIS FORMAT DATA PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64LB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 56 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 18 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE PROCESS ( HEX ) DEPT FT 00 000 00 0 2 1 1 4 68 RHOB LW1 G/C3 00 000 00 0 2 1 1 4 68 DPHI LW1 ~ 00 000 00 0 2 1 1 4 68 DRHO LW1 00 000 00 0 2 1 1 4 68 PEF LW1 00 000 00 0 2 1 1 4 68 DCAL LW1 IN 00 000 00 0 2 1 1 4 68 TNPH LW1 PU 00 000 00 0 2 1 1 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 LIS T~De 9erification Listing Schlumberger Alaska Computing Center 23-SEP-1993 14:30 PAGE: NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE PROCESS ( HEX ) ATR LW1 OHMM 00 000 00 0 2 1 1 4 68 PSR LW1 OHMM 00 000 00 0 2 1 1 4 68 DER LW1 O~MM 00 000 00 0 2' 1 1 4 68 ROPE LW1 F/HR 00 000 00 0 2 1 1 4 68 GR LW1 GAPI 00 000 00 0 2 1 1 4 68 HENA LW1 CPS 00 000 00 0 2 1 1 4 68 HEFA LW1 CPS 00 000 00 0 2 1 1 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 DATA DEPT. 13825.000 RHOB.LWl -999.250 DPHI.LWl -999.250 PEF.'LW1 -999.250 DCAL.LW1 -999.250 TNPH.LWl -999.250 PSR.LW1 -999.250 DER.LWl -999.250 ROPE.LWl 77.255 HENA. LW1 -999.250 HEFA.LW1 -999.250 'DEPT; 12379.500 RHOB.LW1 -999.250 DPHI.LW1 -999.250 PEF.LW1 -999.250 DCAL.LW1 -999.250 TNPH.LWl -999.250 PSR.LW1 ~999.250 DER.LW1 -999.250 ROPE..LWl -999.250 HENA.LWl -999.250 HEFA.LW1 3.794 END OF DATA ** DRHO.LW1 ATR.LW1 GR.LW1 DRHO.LW1 ATR.LW1 GR.LW1 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION - 00lC01 DATE · 93 09 23 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME ' ED93~9/23 DATE - ORIGIN : FLIC TAPE NAME : 93306 CONTINUATION # : 1 PREVIOUS TAPE COMMENT : ARCO ALASKA, INC., PT MCINTYRE, P1-05/J7 ST# 1 , 50-029-22378-00 LIS T~pe ~erification Listing Schlumberger Alaska Computing Center 23-SEP-1993 14'30 **** REEL TRAILER **** · D T SERVICE NAME E3~09/23 DATE ' 9 ORIGIN : FLIC REEL NAME : 93306 CONTINUATION # : PREVIOUS REEL : COMMENT ' ARCO ALASKA, INC., PT MCINTYRE, P1-05/J7 ST#l, 50-029-22378-00 PAGE ' * ALASKA COMPUTING CENTER * * SCHLUMBERGER * ,~~~~Y NAME .' ARCO ALASKA INC. .~I~ME ' P1-05/J7 b NAME · POINT MCINTYRE BOROUGH '.NORTH SLOPE STATE ' ALASKA API NUMBER · 50-029-22378-00 REFERENCE NO · 93298 RECEIVED OCT 1 4 199~ Nas~ Oil & Gas C~ms. ~.emr~{s.s[o,~ LIS Tape Verification Listing Schlumberger Alaska Computing Center **** REEL HEADER **** SERVICE NAME ' ED~ DATE ' 93 9/22 ORIGIN : FLIC REEL NAME : 93298 CONTINUATION # : PREVIOUS REEL : COMMENT : ARCO ALASKA, INC., **** TAPE HEADER **** SERVICE NAME · EDIT DATE ' 93/09/22 ORIGIN : FLIC TAPE NAME : 93298 CONTINUATION # : 1 PREVIOUS TAPE : COMMENT : ARCO ALASKA, TAPE HEADER POINT MCINTYRE UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING~COMPANY: TAPE CREATION DATE: JOB DATA INC. , BIT RUN 1 JOB NUMBER: 93298 LOGGING ENGINEER' JACKSON OPERATOR WITNESS: HEIM SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 22-SEP-1993 16:22 PT MCINTYRE, P1-05/J7, 50-029-22378-00 PT MCINTYRE, P1-05/J7, 50-029-22378-00 P1-05/J7 500292237800 ARCO ALASKA, INC. SCHLUMBERGER WELL SERVICES 22-SEP-93 BIT'RUN 2 93298 JACKSON HEIM 16 12N 14E 1458 697. 50.00 50.00 0.00 BIT RUN 3 93298 JACKSON HEIM OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 9.875 2ND STRING 10.375 4260.0 PAGE: LIS Tame Verification Listing Schlumberger Alaska Computing Center 3RD STRING PRODUCTION STRING REMARKS: 22-SEP-1993 16:22 FIELD ENGINEER'S REMARKS: ********** RUN 1 ********** BIT TO RES 49.71' BIT TO GR 60 13' BIT TO NEU 121.831 BIT TO DEN i15.20' DRILLED INTERVAL 9948' TO 11081 ********** RUN 2 ********** BIT TO RES 49.66' BIT TO GR 60.08' BIT TO NEU 121.781 BIT TO DEN 1115.15' DRILLED INTERVAL 1~081' TO 1155 ********** RUN 3 ********** BIT TO RES 80 93' BIT TO GR 91 35' BIT TO NEU 15~.691 BIT TO DEN ~46.56' DRILLED INTERVAL 1~552' TO 11656 -? DATA PRESENTED OVER RUN #3 IS REAL-TIME DATA ONLY. DOWNHOLE SOFTWARE V4.0C. $ **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION ' 001C01 DATE ' 93/09/22 MAX REC SIZE ' 1024 FILE TYPE : LO LAST FILE : PAGE: FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and cl~ppCd curves; all bit runs merged. DEPTH INCREMENT 0. 5000 FILE SUMMARY PMU TOOL CODE START DEPTH STOP DEPTH CDN 9489.0 11655.0 CDR 9489.0 11655.0 $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH MWD $ MERGED DATA SOURCE PMU TOOL CODE BIT RUN NO. MERGE TOP MERGE BASE MWD 1 9489.0 11033.0 LIS Tape Verification Listing Schlumberger ,Alaska Computing Center 22-SEP-1993 16:22 MWD 2 MWD 3 $ REMARKS: 11033.0 11503.0 11 503 . 0 11 655 . 0 NO DEPTH ADJUSTMEI~TS WERE MADE ON THIS MWD DATA SET AS PER JAMES DEAL/FLOYD BETTIS. $ LIS FORMAT DATA PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1' 66 0 2 66 0 3 73 56 4 66 1 5 66 6 73 7 65 8 68 '0.5 9 65 FT' 11 66 18 12 68 13 66 0 14 65' FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB .NUMB SIZE REPR ID ORDER # LOG TYPE CLASS-MOD NUMB SAMP ELEM CODE PROCESS ( HEX ) DEPT FT 619007 00 000 00 0 1 1 1 4' 68 RHOB MWD GJC3 619007 00 000 00 0 1 1 1 4 68 DRHO MWD G/C3 619007 00 000 00 0 1 1 1 4 68 PEF MWD BN/E 619007 00 000, 00 0 1 1 1 4 68 CALN MWD IN 619007 00 000 00 0 1 1 1 4 68 NPHI MWD PU-S 619007 00 000 00 0 1 1 1 4 68 RA MWD OHMM 619007 00 000 00 0 1 1 1 4 68 RP MWD OHMM 619007 00 000 00 0 1 1 1 4 68 DER MWD OHMM 619007 00 000 00 0 1 1 1 4 68 ROP MWD FPHR 619007 00 000 00 0 1 1 1 4 68 GR MWD GAPI 619007 00 000 00 0 1 1 1 4 68 NCNT MWD CPS 619007 00 000 00 0 1 1 1 4 68 FCNT MWD CPS 619007 00 000 00 0 1 1 1 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 LIS Tape Verification Listing Schlumberge,r,iAlaska Computing Center 22-SEP-1993 16:22 PAGE: NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) FET MWD HR 619007 00 000 00 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 11655.000 RHOB.MWD -999.250 DRHO.MWD -999.250 PEF.MWD CALN.MWD -999.250 NPHI.MWD -999.250 RA.MWD -999.250 RP.MWD DER.MWD -999.250 ROP.MWD 48.700 GR.MWD -999.250 NCNT.MWD FCNT.MWD -999.250 FET.MWD -999.250 DEPT. 9489.000 RHOB.MWD -999.250 DRHO.MWD -999.250 PEF.MWD CALN.MWD -999.250 NPHI.MWD -999.250 RA.MWD -999.250 RP.MWD DER.MWD -999.250 ROP.MWD -999.250 GR.MWD -999.250 NCNT.MWD FCNT.MWD 5.880 FET.MWD -999.250 ** END OF DATA ** -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 **** FILE TRAILER **** FILE NAME : EDIT ' .001 SERVICE : FLIC VERSION ' 00 C0 DATE ' 93}09}22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER *'*** FILE NAME : EDIT .002 SERVICE : FLIC VERSION · 001~ DATE '93 ~122 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 2 RAW MWD Curves and log header data for each bit BIT RUN NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY run in separate files. LIS Tape Verification Listing Schlumberger Alaska Computing Center 22-SEP-1993 16:22 VENDOR TOOL CODE START DEPTH STOP DEPTH CDR 9489 CDN 9489 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL.(FT)' BIT ROTATING SPEED (RpM) HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 11080.5 11080.5 27-JUN-93 FAST 2.3E V4.0C MEMORY 11552.0 9489.0 11552.0 TOOL NUMBER CDR RESISTIVITY CDN NEUTRON/DENSITY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE '(IN)' DRILLERS CASING DEPTH (~T)' BOREHOLE'CONDITIONS MUD TYPE: MUD DENSITY (LB/G)' MUD VISCOSITY [S)' MUD PH: MUD CHLORIDES IPPM): FLUID LOSS (~3): RESISTIVITY (0HMM AT TEMPERATURE DE'GF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX.CIRCULATING TEMPERATURE:' MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION TOOL STANDOFF /IN EWR FREQUENCY HZ REMARKS (IN): FIELD ENGINEER'S REMARKS: ****~***** RUN 1 ****~***** BIT TO RES 49.71', BIT TO GR 60.13' RGS042 NDS018 9.875 4260.0 9.60 0.291 0.235 SANDSTONE 2.65 9.875 1.7 75.0 75.0 PAGE: LIS TaHe Verification Listing Schlumberger Alaska Computing Center 22-SEP-1993 LIS FORMAT DATA BIT TO NEU 121.83' BIT TO DEN ~15.20' DRILLED INTERVAL 9~48' TO 11081 $ 16:22 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 64 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 16 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE PROCESS ( HEX ) DEPT FT 619007 00 000 00 0 2 1 1 4 68 RHOB LW1 G/C3 619007 00 000 00 0' 2 1 1 4 68 DPHIL 00 000 00 DRHO LW1 619007 00 000 00 0 2 1 1 4 68 PEF ' LW1 619007 00 000 00 0 2 1 1 4 68 ' DCAL LW1 IN 619007 00 000 00 0 2 1 1 4 68 TNPH LW1 PU 619007 00 000 00 0' 2 1 1 4 68 ATR LW1 OHMM 619007 00 000 00 0 2 1 1 4 68 PSR LW1 OHMM 619007 00 000 00 0 2 1 1 4 68 DER LW1 O~MM 619007 00 000 00 0 2 1 1 4 68 ROPE LW1 F/HR 619007 00 000 00 0 2 1 1 4 68 GR LW1 GAPI 619007 00 000 00 0 2 1 1 4 68 HENA LW1 CPS 619007 00 000 00 0 2 1 1 4 68 HEFA LW1 CPS 619007 00 000 00 0 2 1 1 4 68 TAB LW1 HR 619007 00 000 00 0 2 1 1 4 68 TABD LW1 HR 61 9007 00 000 00 0 2 1 1 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 ,q£ ' ~ £ 6-MQ£- £ ~ O'~gLL O'neiLL :NOIS~ZA ZH~L~OS ~L~ ~Z~ZH 902 0 ' ~§60 L 0 ' ~§60 L HLdZ~ ~OLS oq~edos uT un~ qIq qo~o =o~ 000§'0 :LMZNZ~DMI HLdZQ ~Z~ZH ZqI~ 0% : Z~XL Z%I~ 60/£6,' 0DL00 : NOIS~ZA DI%~ : ZDIA~ZS £00' ~I~Z : ZN~ Z~I~ O§Z'666- O§Z'666- O§Z'666- 0§Z'666- LA~'M&~ LA~'OHMG OSZ'666- 6L£'££ 0§Z'666- 0S~'666- L~q'~& O§Z'666- L~q'Z~OM O§Z'666- LMq'HAMZ OSZ'666- LMq'IHdG 0§~'666- L~I ' tf~ZH OS~ ' 666- Lt~I ' tfMZH L~I'MZd 0§[ '666- Lt~q' TdDCI 0 §~ ' 666- L tvYI ' i~OI-IM O0§'090LL ',T,dZG £66 L-~ZS-ZE LIS Tape Verification Listing Schlumberger Alaska Computing Center 22-SEP-1993 16:22 DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT/: BOTTOM LOG INTERVAL.(FT)- BIT ROTATING SPEED (RPM) HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE V4.0C MEMORY 11552.0 9489.0 1'1552.0 TOOL NUMBER CDR CDN $ RESISTIVITY NEUTRON/DENSITY BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN]' DRILLERS CASING DEPTHI~T)' RGS042 ,NDS018 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G)' MUD VISCOSITY (S)' MUD PH: MUD CHLORID$S (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM AT TEMPERATURE DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: 9.875 4260.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION 9.60 0.291 0.235 REMARKS: (IN): SANDSTONE 2.65 9.875 TOOL STANDOFF /IN/- EWR FREQUENCY HZ 1.7 FIELD ENGINEER'S REMARKS: ********** RUN 2 ********** BIT TO RES 49.66' BIT TO GR 60 08' BIT TO NEU 121.781 BIT TO DEN !!15'15' DRILLED INTERVAL 11081' TO 1155 # $ LIS FORMAT DATA 75.0 75.0 PAGE: LIS TaDe Verification Listing Schlumberger Alaska Computing Center 22-SEP-1993 DATA FORMAT SPECIFICATION RECORD SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 64 4 66 1 5 66 6 73 7 65 8 68 0,5 9 65 FT 11 66 16 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 16:22 PAGE: SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE PROCESS ( HEX ) RHoBDEPT LW2 ~ C3~ 619007 00 000 00 0 3 1 1 4 68 619007 00 000 00 0 3 1 1 4 68 DPHI LW2 ~ 619007 00 000 00 0 3 ,1 1 4 68 DRHO LW2 619007 00 000 00 0 3 1 1 4 68 PEF LW2 619007 00 000 00 0 3 1 1 4 68 DCAL LW2 IN 619007 00 000 00 0 3 1 1 4 68 TNPH LW2 PU 619007 00 000 00 0 3 1 1 4 68 ATR LW2 OHMM 619007 00 000 00 0 3 1 1 4 68 PSR LW2 OHMM 619007 00 000 00 0 3 1 1 4 68 DER LW2 O~MM 619007 00 000 00 0 3 1 1 '4 68 ROPE LW2 F/HR 619007 00 000 00 0 3 1 1 4 68 GR LW2 GAPI.619007 00 000 00 0' 3 1 1 4 68 HENA LW2 CPS 619007 00 000 00 0 3 1 1 4 68 HEFA LW2 CPS 619007 00 000 00 0 3 1 1 4 68 TAB LW2 HR 619007 00 000 00 0 3 1 1 4 68 TABD LW2 HR 619007 . 00 000 00 0 3 1 1 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 DATA DEPT, 11552.000 RHOB,LW2 -999,250 DPHI,LW2 -999,250 DRHO,LW2 PEF.LW2 -999,250 DCAL,LW2 -999.250 TNPH,LW2 -999,250 ATR,LW2 PSR,LW2 -999.250 DER,LW2 -999,250 ROPE,LW2 78,946 GR,LW2 HENA.LW2 -999,250 HEFA.LW2 -999,250 TAB,LW2 -999.250 TABD.LW2 -999,250 -999,250 -999.250 -999,250 LIS Tape Verification Listing Schlumberger Alaska Computing Center 22-SEP-1993 16:22 PAGE: 10 DEPT. 10952.000 RHOB.LW2 PEF.LW2 -999.250 'DCAL.LW2 PSR.LW2 -999.250 DER.LW2 HENA.LW2 -999.250 HEFA.LW2 ** END OF DATA ** -999.250 DPHI.LW2 -999.250 TNPH.LW2 -999.250 ROPE.LW2 5.140 TAB.LW2 -999.250 -999.250 -999.25O -999.250 DRHO.LW2 ATR.LW2 GR.LW2 TABD.LW2 -999.250 -999.250 -999.250 -999.250 **** FILE TRAILER **** FILE'NAME : EDIT .003 SERVICE : FLIC VERSION · 00}~ DATE '93 ~122 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION ' 001C01 DATE ' 93/09 22 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 4 RAW MWD Curves and log header data for each bit run in separate BIT RUN NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH CDR '11552.0 CDN 11552.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE: SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): 11655.0 11655.0 27-JUN-93 FAST 2.3E V4.0C MEMORY 11552.0 9489.0 files. LIS Tape Verification Listing Schlumberger Alaska Computing Center 22-SEP-1993 16:22 BOTTOM LOG INTERVAL.(FT)- BIT ROTATING SPEED (RPM) HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 11552.0 TOOL NUMBER CDR CDN $ RESISTIVITY NEUTRON/DENSITY BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN)' DRILLERS CASING DEPTH[~T)' BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (ns/Q)' MUD VISCOSITY (S)' MUD PH: MUD CHLORIDES {PPM): FLUID LOSS (C3): RESISTIVITY (OHMM AT TEMPERATURE DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD. AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: RGS042 NDS018 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION 9.875 4260.0 REMARKS: 9.60 0.291 0.235 LIS (IN): SANDSTONE 2.65 9.875 TOOL STANDOFF /IN/' EWR FREQUENCY HZ 1.7 FIELD ENGINEER'S REMARKS: ********** RUN 3 ********** BIT TO RES 80 93' BIT TO GR 91 35' BIT TO NEU 152.69' BIT TO DEN 1~6.56' DRILLED INTERVAL 14552' TO 11656 DATA PRESENTED OVER RUN #3 IS REAL-TIME DATA ONLY. DOWNHOLE SOFTWARE V4.0C. FORMAT DATA 75.0 75.0 PAGE: 11 LIS_Tape Verification Listing Sch±umberg, er Alaska Computing Center 22-SEP-1993 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 64 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11' 66 16 12 68 13 66 0' 14 65 FT 15 66 68 16 66 1 0 66 1 16:22 PAGE: 12 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE PROCESS ( HEX ) DEPT FT 619007 00 000 00 0 4 I 1 4 RHOB LW3 G/C3 619007 00 000 00 0 4 1 1 4 DPHI LW3 ~ 619007 O0 000 O0 0 4 1 1 4 DRHO LW3 619007 00 000 00 0 4 1 1 4 PEF LW3 619007 00 000 00 0 4 1 1 4 DCAL LW3 IN 619007 00 000 00 0 4 1 1 4 TNPH LW3 PU 619007 00 000 00 0 4 1 1 4 ATR LW3 OHMM 619007 00 000 00 0 4 1 1 4 PSR LW3 OHMM 619007 00 000 00 0 4 1 1 4 DER LW3 O~MM 619007 00 000 00 0 4 1 1 4 ROPE LW3 F/HR 619007 00 000 00 0 4 1 1 4 GR LW3 GAPI 619007 00 000 00 0 4 1 1 4 HENA LW3 CPS 619007 00 000 00 0 4 1 1 4 HEFA LW3 CPS 619007 00 000 00 0 4 1 1 4 TAB LW3 HR 619007 00 000 00 0 4 1 1 4 TABD LW3 HR 619007 00 000 00 ·0 4 1 1 4 68 68 .68 68 68 68 68 68 68 68 68 '68 68 68 68 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 ** DATA ** DEPT. 11655.000 RHOB.LW3 -999.250 DPHI.LW3 PEF.LW3 -999.250 DCAL.LW3 -999.250 TNPH.LW3 PSR.LW3 -999.250 DER.LW3 -999.250 ROPE.LW3 HENA.LW3 -999.250 HEFA.LW3 -999.250 TAB.LW3 -999.250 -999.250 48.700 -999.250 DRHO.LW3 ATR.LW3 GR.LW3 TABD.LW3 -999.250 -999.250 -999.250 -999.250 00-g££~-6~0-0§ O0-gL£~-6~O-O~ ' LD/§O-Lc~ ''DNI ' ' DNI : %ZZH SgOIAZ~d : # g6~£6 : ZN~N ~I%~ : NIOI~O 101£6 · E~'6~%dZ ' ZN~N Z3IA~ZS : Zd~i SflOIAAHd L : # NOIi~flNI&NOD g6~£6 : ~N~ ~/60/£6 ' LI~Z ' ZN~M ~DIAHZS ~[0t ' ZZIS O~ ~160/£6 ' 0Dr00 ' NOIS~A DI~ : ZDIAHZS ~00' LI~Z : Z~N 0§['666- O£S'[[t O§L'[ 0§['666- 0§~'666- £~7'S~L 0§~'666- £~'~ZH 0S['666- £~'~MZH 9~6'9£ £~'ZdO~ 0§~'666- £~'~Z~ 0§£'[ £~'~Sd 0§~'666- £~'H~NL 0§~'666- £~'~DG 0§~'666- £~'~Z~ 0§~'666- £27'IH~G 0§['666- £~%'SOH~ O00'~§§LL '~dZG £g ~a~uaD 6uYqndmoD eZseI~ , ,