Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
201-241
7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 05-02A Pull Patch Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 201-241 50-029-20144-01-00 12035 Conductor Surface Intermediate Liner Liner 8820 86 2678 8845 924 3802 11945 20" 13-3/8" 9-5/8" 7" 4-1/2" 8825 25 - 111 25 - 2703 21 - 8866 8538 - 9462 8233 - 12035 25 - 111 25 - 2702 21 - 7980 7736 - 8440 7507 - 8820 11945 520 2670 4760 7020 7500 None 1530 4930 6870 8160 8430 9337 - 11940 4-1/2" 12.6# 13Cr80 21 - 8245 8342 - 8826 Structural 4-1/2" Baker S-3 Packer 8187 7471 Bo York Operations Manager Dave Bjork David.Bjork@hilcorp.com (907) 564-4672 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028325 , 0028326 20 - 7516 N/A N/A 328 Well Not Online 41409 333 1320 470 886 0 N/A 13b. Pools active after work:PRUDHOE OIL No SSSV Installed 8187, 7471 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 7:33 am, Aug 07, 2025 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2025.08.06 16:15:03 - 08'00' Bo York (1248) 8/12/25 RBDMS JSB 080825 DSR-9/10/25 ACTIVITY DATE SUMMARY 7/11/2025 ***WELL S/I ON ARRIVAL*** SET 4-1/2" WHIDDON ON XN-NIPPLE AT 8,233' MD PULLED RK-OGLV FROM STA #4 AT 4,636' MD PULLED RK-LGLV FROM STA #5 AT 2,996' MD SET RK-DGLV IN STA #5 AT 2,996' MD PULLED 4-1/2" WHIDDON AT 8,233' MD (empty- pump truck delayed) RAN 3.70" CENT TO PATCH AT 9,300' MD (all clear) PULLED UPPER 45 KB PATCH SECTION AT 9,300' MD (700# overpull to pull it - recovered all elements - snap latch not sheared) ***CONTINUE ON 7/12/25 WSR*** 7/12/2025 ***CONTINUED FROM 7/11/25 WSR*** PULLED PATCH FROM 9,300' - 9,365' MD RAN 20' x 3.70" DUMMY WHIPSTOCK TO 9,483' SLM (dogleg - unable to work past) RAN 16' x 3.68" NS DUMMY WHIPSTOCK TO 9,452' SLM (unable to work past) RAN 9' x 3" DRIVE DOWN BAILER TO 10,043' SLM SET 4-1/2" WHIDDON ON XN AT 8,233' MD LRS LOADED IA WITH 300bbls OF CRUDE SET RK-DGLV IN ST# 4 AT 4,636' MD PULLED 4-1/2" WHIDDON AT 8,233' SLM (empty) RAN 4-1/2" BRUSH & 3.69" GAUGE RING TO 9,900' SLM (no issues) LRS LOADED TBG W/ 220 BBLS CRUDE ***CONTINUE ON 7/13/25 WSR*** 7/12/2025 T/I/O= 2346/2353/32 Assist Slickline Load & Test ( CTD ) LRS Unit 76 Pumped 300 bbls of crude down IA to load. Pumped 220 bbls of crude down TBG to load. *** Job continued to 7/13/2025 *** 7/13/2025 ***CONTINUED FROM 7/12/25 WSR*** PERFORMED WELL CONTROL DRILL SET 4-1/2" PX-PLUG AT 8,212' MD LRS UNABLE TO PRESSURE UP TUBING (50 bbls pumped) PULL AND RE-SET P-PRONG AT 8,212' MD LRS UNABLE TO PRESSURE UP TUBING (39 bbls pumped) PULLED 4-1/2" PX PLUG AT 8,212' MD (looks good) SET 4-1/2" CAT STANDING VALVE IN XN-NIPPLE AT 8,233' MD LRS UNABLE TO PRESSURE UP TUBING (125 bbls pumped) SET 4-1/2" X-SELECTIVE TEST TOOL AT 8,212' MD (unable to pressure up tbg - 20 bbls pumped) SET 4-1/2" X-SELECTIVE TESTAT 8,166' MD LRS PERFORMED PASSING MIT-T ***CONTINUE ON 7/14/25 WSR*** Daily Report of Well Operations PBU 05-02A Daily Report of Well Operations PBU 05-02A 7/13/2025 *** Job continued from 7/12/2025 *** Pumped 220 bbls of crude down TBG to load. Pumped 232 bbls crude down TBG to attempt to pressure up on plug. MIT-T **PASSED** Pumped 1.5 bbls of crude down TBG to reach test pressure of 3330 psi. After first 15 min TBG lost 197 psi. After second 15 min TBG lost 76 psi. Bled back 1.3 bbls. CMIT-TxIA *** FAILED *** Pumped 6.3 bbls of crude down TBG & IA to reach test pressures. After first 15 min TBG lost 55 psi & IA lost 54 psi. After second 15 min TBG lost 30 psi & IA lost 30 psi. Bleed back & attempt test again. *** Job continued to 7/14/2025 *** 7/14/2025 ***CONTINUED FROM 7/13/25 WSR*** LRS ATTEMPTED CMIT-TxIA (see LRS log) PULLED 4-1/2" X-SELECTIVE AT 8,166' MD RAN 40 ARM HES CALIPER PER PROGRAM ***WELL LEFT S/I, DSO NOTIFIED OF STATUS*** 7/14/2025 *** Job continued from 7/13/2025 *** CMIT-TxIA *** FAILED*** Pumped 7.8 bbls of crude down TBG & IA to reach test pressure. After first 15 min TBG lost 90 psi & IA lost 92 psi. After second 15 min TBG lost 60 psi & IA lost 62 psi. Well left in slicklines control. DSO notified upon departure. FWHP = 490/500/125 7/22/2025 T/I/O=SSV/410/10, Temp=SI. PPPOT-IC PASS (eval IAxOA). No AL. PPPOT-IC: Stung into test port, 350 psi, bled to 0 psi. Monitored for 10 min, IC test void increased 150 psi. Pumped through void, good returns. Pressured void to 3500 psi lost 400 psi in 15 min, Bled void to 0 psi. Tighten LDS. Pressured void to 3500 psi for 30 min test, lost 125 psi in 15 min, lost 30 psi in second 15 min, PASS. Bled void to 0 psi. SV, WV, SSV = C. MV = O. IA, OA = OTG. 00:45 7/28/2025 T/I/O= 2435/405/8 (ANN-COMM) MIT-IA PASSED (MAX APPLIED 2500 psi) (TARGET 2250 psi) Pumped 4.4 bbls crude into IA to pressure to 2502 psi. First 15 mins lost 54 psi. Second 15 mins lost 18 psi. Bled back 4.2 bbls. DSO notified upon departure. FWHP= 2438/408/13 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 05-02A Reset Patch Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 201-241 50-029-20144-01-00 12035 Conductor Surface Intermediate Production Liner 8820 86 2678 8845 924 3802 11945 20" 13-3/8" 9-5/8" 7" 4-1/2" 8825 25 - 111 25 - 2703 21 - 8866 8538 - 9462 8233 - 12035 25 - 111 25 - 2702 21 - 7980 7736 - 8440 7507 - 8820 11945 520 2670 4760 7020 7500 none 1530 4930 6870 8160 8430 9337 - 11940 4-1/2" 12.6# 13Cr80 21 - 8245 8342 - 8826 Structural 4-1/2" Baker S-3 Perm No SSSV 8187 7471 Bo York Operations Manager Dave Bjork David.Bjork@hilcorp.com (907) 564-4672 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028325 , 0028326 20 - 7516 332 392 37704 40610 342 363 0 0 1060 874 N/A 13b. Pools active after work:PRUDHOE OIL 8187 7471 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 1:31 pm, Jun 24, 2024 Digitally signed by Eric Dickerman (4002) DN: cn=Eric Dickerman (4002) Date: 2024.06.24 12:48:20 - 08'00' Eric Dickerman (4002) WCB 9-10-2024 RBDMS JSB 062724 DSR-6/25/24 ACTIVITYDATE SUMMARY 4/8/2024 Assist E-Line with a FL FP. Pumped 8 BBLS 60/40 followed by 61 bbls crude to FP FL. Tags hung on WV upon departure. 4/8/2024 T/I/O = SSV/1190/0. Temp = SI. Eval glaciation. No AL. Heater installed in well house, working properly. Standing water in cellar, no active bubbling observed. 24" deep around well head. Obtained sample for lab. SV, WV, SSV = C. MV = O. IA, OA = OTG. 17:15 4/15/2024 ***WELL S/I ON ARRIVAL*** (Patch tbg/ liner) RAN 3.65" GAUGE RING TO 8,250' SLM (unable to get past) RAN 4-1/2" BRUSH & 3.50" G. RING TO 8,250' SLM (unable to get past, fresh marks) RAN 3.50" CENT BARBELL & 3.50" LIB TO 8,250' SLM (jagged marks towards middle) RAN 10' x 3" PUMP BAILER TO PATCH AT 9,305' MD (recovered small piece of metal) RAN 2.70" MAGNET TO 8,250' SLM (unable to get further, recovered larger piece of metal) RAN 2.70" MAGNET TO PATCH AT 9,297' SLM MULTIPLE TIMES(recovered multiple pieces of metal) ***CONTINUED ON 4/16/24 WSR*** 4/16/2024 ***CONTINUED FROM 4/15/24 WSR*** (Patch tubing liner) PULLED COMPLETE UPPER 45 KB PACKER AT 9,305' MD PULLED COMPLETE LOWER FLO-GARD PACKER AT 9,354' MD RAN 3.50" CENT & 4-1/2" BRUSH TO DEVIATION AT 10,020' SLM RAN READ 40 ARM CALIPER FROM 9,800' SLM TO 7,700' SLM (good data) ***WELL S/I ON DEPARTURE/ DSO NOTIFIED OF WELL STATUS*** 5/8/2024 *** WELL SI ON ARRIVAL *** (SET LOWER ANCHOR) INITIAL T/I/O = 2400/1150/0 MIRU YJT E-LINE PT PCE 300PSI LOW 3500PSI HIGH SET DOWN AT 2400 FT RIH, SET DOWN AT 7218 FT RIH AND STUCK, DISPATCH PUMP TRUCK. ABLE TO PULL FREE, AND DRAG ASSEMBLY OUT OF HOLE, HANGING UP AND OVERPULLING ON TUBING COLLARS AND GLMS. GOT TO SURFACE, RD PKR AND ELINE. DAMAGED SLIP CAGE ON PACKER, ELEMENT SWOLLEN. METAL SHAVINGS FOUND INSIDE OF THE SETTING SLEEVE. RDMO YJT E-LINE FINAL T/I/O = 2400/1150/0 *** WELL SI ON DEPARTURE, ELINE INCOMPLETE *** 5/8/2024 Standby for E-line--Pulling out of hole, rather sticky. No pumping needed. 5/10/2024 ***WELL S/I ON ARRIVAL*** DRIFTED FREELY TO 9450'SLM w/ 10' x 3.70'' DMY WHIPSTOCK DRIFT RAN 4-1/2'' BLB, 10' x 3.70'' WHIPSTOCK DRIFT, 3.70'' G-RING TO 9450'SLM ***WELL LEFT S/I ON DEPARTURE*** 5/15/2024 T/I/O=2400/1200/0 TFS Unit 4 (Load and Kill) Assist E-Line Pumped a total of 5 BBLS of 60/40 and 231 BBLS of Crude to Load and Kill Well. Pumped 60/40 at 1 BPM once Swapped to Crude gradually brought up to 5 BPM once 50 BBLS were down hole. FWHP= 300/1250/0 Daily Report of Well Operations PBU 05-02A PULLED COMPLETE LOWER FLO-GARD PACKER AT 9,354' MD (g) PULLED COMPLETE UPPER 45 KB PACKER AT 9,305' MD Daily Report of Well Operations PBU 05-02A 5/16/2024 ***WELL S/I ON ARRIVAL, DSO NOTIFIED*** OBJECTIVE: SET LOWER PATCH ANCHOR RIG UP YELLOW JACKET ELINE PT PCE 300 PSI LOW /3500 PSI HIGH RIH W/ ( CH 1' 1.435" ) ( WB 7' 1.687" ) ( GG 6.08' 2.750" ) ( B10 4.71' 2.75" ) ( BPATCH 10.22' 3.700" ) CCL TO MID-ELEMENT 16.5' CCL STOP DEPTH 9348.5' SETTING DEPTH AT 9365'. SET PACKER AT 9365' ME, TOP OF PACKER @ 9361' OAL LIH = 8.93' *** JOB COMPLETE *** 5/25/2024 ****WELL S/I ON ARRIVAL**** (Patch tubing / liner) SET 23.9" MIDDLE PATCH SECTION STUNG INTO LOWER PACKER @ 9,361' ELMD. GOOD PULL TEST. SHEAR OFF . POOH. SET 38.59" UPPER 45 KB PACKER PATCH SECTION STUNG INTO MIDDLE SECTION @ 9,341' SLM. SET PACKER WITH DPU. LOOKS LIKE A GOOD SET. POOH. MIDDLE SECTION: 23.90' OAL / Max OD= 3.70". Top Pkr Section: 38.59' OAL / Max OD= 3.70". 9,300' - 9,365' ELM ME to ME ***CONTINUED ON 5/26/24*** 5/26/2024 ***CONTINUED FROM 5/25/24 WSR*** (Patch tubing / liner) RD POLLARD UNIT # 60 ***WELL S/I ON DEPARTURE*** (g) SET 23.9" MIDDLE PATCH SECTION STUNG INTO LOWER PACKER @ 9,361' ELMD. GOOD PULL TEST. SHEAR OFF . POOH. SET 38.59" UPPER 45 KB PACKER PATCH SECTION STUNG INTO MIDDLE SECTION @ 9,341' SLM. SET PACKER WITH DPU. LOOKS LIKE A GOOD SET. POOH. RIH W/ ( CH 1' 1.435" ) ( WB 7' 1.687" ) ( GG 6.08' 2.750" ) ( B10 4.71' 2.75" ) (()( BPATCH 10.22' 3.700" )) CCL TO MID-ELEMENT 16.5' CCL STOP DEPTH 9348.5' SETTING DEPTH AT 9365'. Nolan Vlahovich Hilcorp Alaska, LLC Geotech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 4/19/2024 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20240419 Well API #PTD #Log Date Log Company Log Type AOGCC Eset# BRU 241-23 50283201910000 223061 4/5/2024 AK E-Line Perf BRU 242-04 50283201640000 212041 3/20/2024 AK E-Line JB/PProf NCIU A-17 50883201880000 223031 3/27/2024 AK E-Line GPT/Perf PBU 05-02A 50029201440100 201241 4/6/2024 Halliburton PPROF PBU 09-35A 50029213140100 193031 4/9/2024 Halliburton RBT PBU 13-24A 50029207390100 204243 4/5/2024 Halliburton RBT PBU B-14A 50029203490100 209059 4/2/2024 Halliburton RBT PBU D-31B 50029226720200 212168 4/7/2024 Halliburton PERF SRU 222-33 50133207150000 223100 3/27/2024 AK E-Line CIBP/Perf SRU 224-10 50133101380100 222124 3/29/2024 AK E-Line CIBP/Perf SRU 241-33B 50133206960000 221053 4/2/2024 AK E-Line CIBP Please include current contact information if different from above T38718 T38719 T38720 T38721 T38722 T38723 T38724 T38725 T38726 T38727 T38728 PBU 05-02A 50029201440100 201241 4/6/2024 Halliburton PPROF Meredith Guhl Digitally signed by Meredith Guhl Date: 2024.04.19 14:54:13 -08'00' Operator Name:2. Development Exploratory Service 5 Permit to Drill Number:201-241 6.50-029-20144-01-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 12035 11945 8825 8187 / 8241 11945 None 7471 / 7513 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 86 20" 25 - 111 25 - 111 1530 520 Surface 2680 13-3/8" 23 - 2703 23 - 2702 4930 2670 Intermediate 8845 9-5/8" 21 - 8866 21 - 7980 6870 4760 Liner 924 7" 8538 - 9462 7736 - 8440 8160 7020 Perforation Depth: Measured depth: 10310 - 11940 feet True vertical depth: 8872 - 8826 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# 13Cr80 21 - 8245 21 - 7516 8187 / 8241 7471 / 7513Packers and SSSV (type, measured and true vertical depth) BKR S-3 / BKR ZXP Liner 3802 4-1/2" 8233 - 12035 7507 - 8820 8430 7500 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 8216756255 48037439 1010 27659 379 890 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Dave Bjork david.bjork@hilcorp.com Authorized Name:Bo York Authorized Title: Authorized Signature with Date:Contact Phone:(907)564-5683 Treatment descriptions including volumes used and final pressure: 13. Sr Operations Manager 1. Operations Performed Abandon Plug Perforations 5 Fracture Stimulate Pull Tubing GSTOR WINJ WAG GINJ SUSP SPLUG 16. Well Status after work:Oil 5 Gas Exploratory Development 5 Stratigraphic 15. Well Class after work: Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured8820 Sundry Number or N/A if C.O. Exempt: N/A No SSSV Junk Packer Printed and Electronic Fracture Stimulation Data 5 Mill CIBP/Patch Operations shutdown Change Approved Program 5 Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028325 & 0028326 PBU 05-02A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations By Meredith Guhl at 12:42 pm, Sep 21, 2021 Digitally signed by Kirsty Glasheen (4474) DN: cn=Kirsty Glasheen (4474), ou=Users Date: 2021.09.21 12:10:14 -08'00' Kirsty Glasheen (4474) SFD 9/28/2021DSR-9/21/21MGR14OCT2021 RBDMS HEW 9/22/2021 ACTIVITYDATE SUMMARY 8/26/2021 CTU 6 1.75" CT Job Scope: Mill CIBP MIRU. MU Thunderbird milling bha w/ 3.70" five bladed, reverse clutch mill. Partially load well + FP, RIH. Hydraulic hose going to reel blew while rih. Standby for new hose to be delivered. ***Job in Progress*** 8/27/2021 CTU 6 1.75" CT Job Scope: Mill CIBP Fix hydraulic hose supplying reel. Continue RIH. Mill CIBP from 9953 and push to PBTD 11945'. POOH. Well freeze protected with 12bbl of 50/50 and 30 bbl of diesel. DSO notified of well status and will POP with PBGL tomorrow. RDMO ***Job Complete*** 9/2/2021 ***WELL ONLINE ON ARRIVAL, NOTIFY DSO***(set lower patch packer) SET BAKER HUGHES 45 FLO-GARD LOWER PATCH PACKER MID-ELEMENT AT 9354'. CCL TO MID-ELEMENT: 16.4'. CCL STOP DEPTH: 9337.6'. 8.93' LIH, BOTTOM OF PATCH AT 9358.7'. ***WELL LEFT S/I ON DEPARTURE, TURNED OVER TO DSO*** 9/12/2021 ***WELL S/I ON ARRIVAL***(patch). SET 43,.2' x 45 KB PACKER UPPER PATCH SECTION @ 9353' SLM upper section @ 9309' mid upper element, top of patch @ 9305' MD OAL of 2 - piece Patch is 53' ***WSR CONTINUED ON 9-13-21*** 9/13/2021 ***WSR CONTINUED FROM 9-12-21*** RAN HILCORP SBHPS GAUGES PER PROGRAM. ***WELL LEFT S/I ON DEPARTURE, JOB COMPLETE*** Daily Report of Well Operations PBU 05-02A STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WFI I (111001=12ATIMIC nrT /1 9 Form 10-404 Revised 04/2017 11 1, QT S RBDMSI� OCT 0 7 7010 Submit Original Only 1. Operations Performed Abandon ❑ Plug Perforations Z Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Set CIBP 0 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development 0 Exploratory ❑ 5. Permit to Drill Number: 201-241 3. Address: P.O. Box 196612 Anchorage, 1 6. API Number: 50-029-20144-01-00 AK 99519-6612 Stratigraphic ❑ Service ❑ 7. Property Designation (Lease Number): ADL 028326 8 028325 8. Well Name and Number: PBU 0"2A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 12035 feet Plugs measured 9953 feet true vertical 8820 feet Junk measured None feet Effective Depth: measured 9953 feet Packer measured 8187 feet true vertical 8814 feet Packer true vertical 7471 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 86 20" 25-111 25-111 1530 520 Surface 2678 13-3/8" 25-2703 25-2702 4930 2670 Intermediate 8834 9-5/8" 23-8857 23-7972 8150 / 6820 / 6870 5080 /3330 14760 Liner 933 7' 8529-9462 7730-8440 8160 7020 Liner 3802 4-1/2" 8233- 12035 7507-8820 8430 7500 Perforation Depth: Measured depth: 9337 - 11940 feet True vertical depth: 8342-8826 feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr80 21 -8245 21 -7516 Packers and SSSV (type, measured and 4-1/2" Baker S-3 Perm Packer 8187 7471 true vertical depth) No SSSV Installed 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 428 44365 264 0 1050 Subsequent to operation: 151 30545 44 0 962 14. Attachments. (required per20 nnc 25.070.25W1, &25 283) 15. Well Class after work: Daily Report of Well Operations El Exploratory ❑ Development p Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: 0 Oil Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Authorized Name: Oestgaard, Finn Contact Name: Oestgaard, Finn Authorized Title: Production Engineer Challgriger Contact Email: Finn.OestgaardAbp.com Authorized Signature: Date'. �Q(Lt' I"I Contact Phone: +1 907 564 5026 Form 10-404 Revised 04/2017 11 1, QT S RBDMSI� OCT 0 7 7010 Submit Original Only Daily Report of Well Operations PBU 05-02A Ar.TIVITvn ATF 'WELL S/I ON ARRIVAL`** (profile mod DRIFTED TO DEVIATION @ 9,960' SLM W/ 3.70" BARBELL CENTRALIZERS, Y SAMPLE BAILER RAN 3.80" GAUGE RING TO XN NIP @ 8,210' SLM (+23' correction to md) 9/8/2019 ***CONTINUE WSR ON 9/9/19*** ***CONTINUE WSR FROM 9/8/19*** (profile mod) SET 4 1/2" CIBP @ 9930' SLM (9,953' MD HALLIBURTON DPU FROM 9917' SLM RAN 3.50" LIB TO CIBP, TAG @ 9931' SLM (9,953' MD) 9/9/2019 ***WELL LEFT S/I DSO NOTIFIED ON DEPARTURE*** DATE REV BY COMMENTS DATE REV BY COMMENTS 10/78!/4 ORIGINAL COMPLETION 0328/17 FO/JMD ADDED -PERF & DATE 01/08188 RWO OSMO117 KFS/JMD ADPERF 05/07/17) 02118/02 RIG SIDETRACK 05-0210 09/11/19 MTWJMD SET4-12-CIBP 09109/19 04/03/13 RKT/JMD GLV C/O (0323/13) 10101/19 DO/JMD ADDED OKB, REF, & BF ELEV 08/05/13 DU/JMD TREE C/O 07/18/13 0623/14 JDM/JMD PULLED CIBP 08/19/14) PRUDHOE BAY UMT WELL: 05-02A PERmrr No: F1012410 API No: 50-029-2014401 BP Exploration (Alaska) BAN(ER PRINT DISTRIBUTION LIST UGHES a GE company COMPANY BP Exploration Alaska Inc. WELL NAME 05-02A FIELD Prudhoe Bav Unit 20124 30539 Ise sign and return one copy of this transmittal form to: Exploration (Alaska)Inc. rotechnical Data Center, 1-112-1 I E. Benson Blvd. :horage, Alaska 99508 or AKGDMINTERNAL@bp.com COUNTY PRUDHOE BAY LOG TYPE RPM:PNC3D BHI DISTRICT Alaska --- LOG DATE December 13, 2019 AUTHORIZED BY Paul Canizares EMAIL Paul. CanlZareS@bhoe.COm TODAYS DATE April 2, 2019 1 STATUS Final Replacement: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION V BP North Slope. EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aides Attn: Benda Glassmaker & Peggy O'Neil 900 E. Benson Blvd. Anchoraee. Alaska 99508 2 ConocoPhillips Alaska Inc. Attn: Ricky Elgarico ATO 3-344 700 G Street Anchorage, AK 99501 3 Lynda M. Yaskell and/or Lisa Boggs C Street, Suite 505 enrage. AK 99503 'State of Alaska - AOGCC Attn: Makana Bender 333 W. 7th Ave, Suite 100 'Anchorage, Alaska 99501 51DNR - Division of Oil & Gas *** Attn: Garret Brown 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Revision No Details: Rev. Requested by: --- FIELD I FINAL CD/DVD FINAL PRELIM LOGS (las, dlis, PDF, META, SURVEY REPORT LOGS CGM, Final Surveys) (Compass) # OF PRINTS # OF COPIES 11# OF COPIES # OF COPIES V RECEIVED AOGCC C+1 TOTALS FOR THIS PAGE: 0 1 4 0 0 STATE OF ALASKA • 1110 STATE OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate ® Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 201-241 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory 0 AK 99519-6612 Stratigraphic 0 Service 0 6. API Number: 50-029-20144-01-00 7. Property Designation(Lease Number): ADL 0028325 1P a 8. Well Name and Number: PBU 05-02A ADL oo2S3 tt' S A 1Q 1. 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 12035 feet Plugs measured feetRECEIVED true vertical 8820 feet Junk measured feet JUN'I' 8 Effective Depth: measured 11947 feet Packer measured 8185 feet JUN' 0 2017 true vertical 8825 feet Packer true vertical 8238.09 feet AOGCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 87 20"94#H-40 26-113 26-113 1530 520 Surface 2680 13-3/8"72#N-80 25-2704 25-2703 4930 2670 Intermediate Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 9337-9367 feet feet 10310-10340 feet 10400 10430 feet 10690-11480 feet 11700-11760 feet 11860-11940 feet True vertical depth: 8342-8365 feet feet 8872-8873 feet 8875-8876 feet 8874-8843 feet 8834-8832 feet 8829-8826 feet Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: SCANNED JUL2 4 2017 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 598 37815 3 560 976 Subsequent to operation: 1347 59105 0 560 1118 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations ® Exploratory 0 Development Q Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Authorized Name: Oestqaard,Finn Contact Name: Oestqaard,Finn Authorized Title: Produ ' n Engineer Cha nq CJ-7 1 Contact Email: Finn.Oestqaard@bp.com Authorized Signature: Date: / I—] Contact Phone: +1 907 564 5026 Form 10-404 Revised 04/2017 it 77- --/111-7-- .. u ` RBDMS �V JUN 1 3 2017 /?�' Submit Original Only • • Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 RECEIVED JUN 0 8 20177 RE: BP Exploration (Alaska), Inc. AOGCC Report of Sundry Well Operations Summary June 6, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for adding of Perforations for Well 05-02A, PTD # 201-241. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage,AK 99519-6612 • • ill Packers and SSV's Attachment PBU 05-02A SW Name Type MD TVD Depscription 05-02A TBG PACKER 8184.69 7469.41 4-1/2" Baker S-3 Perm Packer 05-02A PACKER 8238.09 7510.95 7" Liner Top Packer • w 0.o 000000000 Cp N N- CO CO CO CO O N CO 0 CD 0 LO O N LO G N L[) CO L[) r— CO N- C) 53 c`') LU N O� Ln M O ,or C�) • Ln 0) r co co - r- N. m co CO CO a) co a0 I� CO MMONOLc) 00 cf 0 0) O Is- N ct CO x— r I. co co O 0) co 1 N Lf) N N CO I- I's CO CO I� CO N O LC) CO CO LO N O) 0 N- O N O C1 N N N C'7 CO O L0 I- N N N CD C N Ch O 0 co CO M CCOO CO Ps- CO N COO CO CD 0N 0 0 N 00 C) p N1.4 c0 LL7 O I� 0 CDONOOcoC) NOM C0 N N N N COD N- ONO coLONN a 0 0 Ln 000 0 000 co c Q) OtZw `.' ""m - UCU C = c.1 w (� Z • N d) CO r N r -0\0 V NMS -a\oLn ;15ci N ' 0) d) ) 0) 0) — cp N- co N- 00) 1— N- O Lf) 0) C) co N N '— Cr)0CA M CO Z Z Z Z D)O 0000 'rn00000U cop <Q O O O O O W X Z Z Z W O O O O W W m m O D W W W Z Z D D Ucnaaaa11 _1I— f- 1 . 0 • 1 , co-. I q L o a 1 0- II 0 ae k / / 0° / 2 ' E o 0 k 0 -i 2 < O & / + cc 6k0 >z i= mawL E < = o -J ce 2 Co 0 -3 � O � C o » 2 = ct 2 & z as E ca $ ƒ co w 9 ƒ 2 / @ _ L & L O0. Q / � / � / k c a / � L CO 2 r a 5 to co 7 0 0 2 : - D E o Lw 2 & 3 14- D t 2 2 0 L 3 ^ o ƒ tin 6 F— <>. / a b a � > c - 5 ƒ 2 2a2 CL cencnce - k � 2 / � >, k / bh ¢ a2 E / E 0W6O - 00 00j D 0 « C & o S 2 > $ \ qx / q7 ƒ ) Z w = a 0 2 2 G a O0 � CN & ƒ Z Z < E -Ia. kQ0 i ii < 0 EtE _i co R7-I •• 00 = Ow 2 . k0mcc 2 / _ | ƒ I | E |a2g z L \ 0 ¥ N. >- E. / 2 5 ® co m R a in 0 TREES 5-1/8"FMC 120 S 0 ` WH LNEAD= FMC SAFETY NOTES: WELL ANGLE>70°@ 10000'. ACTUATOR= BAKER C 05-02A "•4-1 i2"CITRON E TBG&LW*** UfAL KB.ELE 60.1' ..................................... BF.ELEV= NA KOP= 4200' ............ .... Max Angle= 94" 11529' I I 2190' H4-1/2-FES X FW,D=3.813" Datum MD= 10160' Datum ND= 8800'SS GAS LFT MANDRELS 13-3/8"CSG,72#,MN-80,D=12.347" H 2712' 1--/ ST MD ND DEV TYPE VLV LATCH PORT DATE 5 2996 2993 6 WAG DOME RK ir 16 03/23/13 © 4 4636 4614 18 MMG SO RK r 20 03/23/13 3 5924 5710 38 MAG DMY RK r 0 02/16102 2 7090 6605 40 ME DMY RK r 0 02/16/02 1 8099 7402 38 MMG DMY RK r 0 02/16/02 Minimum ID =3.725"@ 8233' 4-1/2" HES XN NIPPLE I I 1 8166' H4-12'FES X NP,D=3.813" 8187' —19-5/8'X 4-1/2'BKR 6-3 RCR,D=3.875" I I 8212' I--14-1/2'FES X NP,D=3.813' I , 8233' H4-12"FES XN NP,D=3.725J TOP OF BKR TEBACK SLEEVE,D=7.50' H 8233' 4-12"TBG,12.6#,13-C12_0152 bpt,D=3.958"H 8244' ` 8245' —14-1/2'WLE3G,D=4.00" 8241' H9-5/8'X 4-12"BKRI ZXP PKR,D=6.290" 8247' —9-5/8'X 4-12 D"BKR LNR HGR, =6.270' 8256 —7'X4-12'X0,13=3.910 J 9-5/8"X 7'LNR HGR --I 8538' I 9-5/8'CSG,47#,L-80,ID=8.681'—{ 8866' • , PERFORATION SUMMARY REF LOG:MAO ROPIDGRIEWRon 02/04/02 ' 7'LNR MLLOUT WINDOW (05-02A) ANGLE AT TOP PERF:38"©9337' •11‘\ 9462'-9474' (OFF WHPSTOC3C) Note:Refer to Production DB for historical perf data SIZE SFF INTERVAL Opn/Sqz SHOT SQZ ` 2-7/8' 6 9337-9367 ' 0 05/07/17 2-7/8" 6 10310-10340 0 03/14/13 ` 2-7/8" 6 10400-10430 0 03/14/13 2-12" 4 10690-11480 0 02/14/02 /'*". ` 212" 4 11700 11760 0 02/14/02 ....A: ..4.1'447►y4' 2-1/2" 4 11860-11940 0 02/14/02 4.1.1.44 ` 0444444444444444 �444441444144411 144444444444444 4.1..1.1 44444444 444444444444444 7"LNR,29#,N-80,D=6.184" —I 10194' ,•••••••4 PBTD 11946' y444444444�. .4'44444. 4-12"LNR,12.6#,13-CR-80,.0152 bpf,D=3.958" —I 12035' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY INT 10/18/74 ORIGINAL COMPLETION 04/03/13 RKT/JMD GLV C/O(03/23/13) WELL: 05-02A 01/08/88 MVO 08/05/13 DUIJMD TREE C/O(07/18/13) PERMIT No: 2012410 02/16/02 RIG SIDETRACK(05-02A) 06/23/14 JDMJMD PULLED CBP(06/19/14) AR No: 50-029-20144-01 03/01/02 CHrTP CORRECTIONS 03/28/17 FO/JM) ADDED PEW LOG&DATE SEC 32,T11N,R15E,2614'NSL&1109'BM_ 06/12/03 CMD/TLP KB ELEVATION CORRECTION 05/10/17 KFS/JMD ADPERF(05/07/17) 04/03/13 RMJMD ADFERFS(03/14/13) BP Exploration(Alaska) 2O -2 1 • • -z G 2., //�® PRINT DISTRIBUTION LIST BAKER 15-3' O5 O2 A Please sign and return one copy of this transmittal fc HUGHES o2 Zia o\-2.9 (mandatory) ©1,t(o Petrotechnical Data Center, LR2-1 DATA LOGGED WELL NAME 5 DIFFERENT WELLS 900 E. Benson Blvd. 9 /2`1/2ots M.K.BENDER (mandatory) Anchorage, Alaska 99508 FIELD Prudhoe Bay Unit to acknowledge receipt of this data. (mandatory) COUNTY North Slope Borough LOG TYPE RPM-Wireline (mandatory) (mandatory) STATE Alaska BH DISTRICT Alaska (mandatory) (mandatory) LOG DATE: September 3,2015 TODAYS DATE: 24-Sep-15 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: CANIZARES EMAIL: (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? No HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANY A B C D ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) L.I.S. FILM PERSON ATTENTION #OF PRINTS#OF COPIES#OF COPIES#OF COPIES#OF COPIES#OF COPIES U U U U U 1 ConocoPhillips Alaska Inc. 1 1 1 1 Attn:Ricky Elgaricio A= 05-02A_RPM_PNC3D_RAW_03SEP2015_BH I.meta ATO 3-344 700 G Street Anchorage,AK 99510 B= *(Folder 1 on cd/dvd) 05-02A_RPM_PNC3D_RAW_03SE1 2 ExxonMobil,AlaskaRECEIVED C^��\/��I 1 1 1 Attn:Lynda M.Yaskell and/or C4 v Leonardo Elias SEP 2 8 2015 AU�� 7 3700 Centerpointe Dr.Suite 600 SCANNED AV G 1 2016 IU Anchorage,AK 99503 i$Oc3 C6 3 !State of Alaska-AOGCC 1 1 1 1 Attn:Makana Bender 333 W.7th Ave,Suite 100 Anchorage,Alaska 99501 4 DNR-Division of Oil&Gas 0 0 1 1 Attn:Sean Clifton 550 West 7th Avenue,Suite 802 Anchorage,Alaska 99501 5 TOTALS FOR THIS PAGE: 2 1 1 1 0 0 TOTALS FOR ALL PAGES: 2 1 1 1 0 0 STATE OF ALASKA .r Allk KA OIL AND GAS CONSERVATION COM ION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon U Repair Well U Plug Perforations U Perforate U Other U Performed: Alter Casing ❑ Pull Tubing❑ Stimulate - Frac ❑ Waiver ❑ Time Extension Change Approved Program ❑ Operat. Shutdown❑ Stimulate - Other ❑ Re -enter Suspended WeII❑ 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name. BP Exploration (Alaska), Inc Development 5 Exploratory Ell 4, 201 -241 -0 3. Address: P.O. Box 196612 Stratigraphic❑ Service ❑ 6. API Number: Anchorage, AK 99519 - 6612 " 50- 029 - 20144 -01 -00 7. Property Designation (Lease Number): a )1') ll g 8. Well Name and Number: 4 D 1-t Q% 3 a(, ADL0028325 Y 9 PBU 05 -02A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): To Be Submitted PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth measured 12035 feet Plugs measured 11640 feet true vertical 8819 feet Junk measured None feet Effective Depth measured 11640 feet Packer measured See Attachment feet true vertical 8835.5 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20" 94# H -40 34 - 114 34 - 114 1530 520 Surface 2679 13 -3/8" 72# MN -80 33 - 2712 33 - 2710.92 5380 2670 Intermediate None None None None None None Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 10310 - 10340 feet 10400 - 10430 feet 10690 - 11480 feet 11700 - 11760 feet 11860 - 11940 feet True Vertical depth 8871.99 - 8873.39 feet 8875.12 - 8875.88 feet 8873.85 - 8843.41 feet 8833.61 - 8832.02 feet 8829.45 - 8825.54 feet Tubing (size, grade, measured and true vertical depth) 4 -1/2" 12.6# 13Cr80 23 - 8245 23 - 7516.29 Packers and SSSV (type, measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12. Stimulation or cement squeeze summary: Intervals treated (measured): SCANNED APR 2 2 2013 Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 804 36903 95 0 1140 Subsequent to operation: 783 36365 44 0 1202 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development El * Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: - Oil 5 Gas U WDSPLU GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Nita Summerhays Email Nita.Summer BP.com Printed Name Nita Summerhaysj Title Petrotechnical Data Technician J Signature � �o/A/A i��i41,,,,,,,; fr . " �........ Phone 564 -4035 Date 4/3/2013 ✓ R8 DMS APR 0 5 2013 L 1 11 I Form 10-404 Revised 10/2012 � A--,1 Submit Original Only • • Daily Report of Well Operations ADL0028325 ACTIVITYDATE 1 SUMMARY VT •f 1 - • 1 -- V' pre -pe DRIFTED TO DEV W/ 20' X 2 7/8" DUMMY GUN TO 9944'SLM - BAILER EMPTY 9/30/2012 ***TURN WELL OVER TO DSO, LEFT WELL SHUT IN * ** T /I /0= 1160/750/0 +. Temp= 78. IA FL (Pre E- line). AL spool removed. IA FL near surface. 2/8/2013 SV =C. WV, SSV & MV =0. IA & OA =OTG. NOVP. 1420 hrs. 2/26/2013 Heat upright tank * * *WSR continued to 2- 27 -12 * ** 2/27/2013 * * *WSR continued from 2- 26 -13 * ** Heat upright tank 3/4/2013 Heat Upright Tank of KCL, Job Cancelled ( Heat Upright Tank) Rig to upright tank and heat to 140 *.RDMO / Operator 3/6/2013 notified of departure. T /I /0= 1100/760/40. Temp =Hot. Load & Kill to Assist E -Line. Job postponed due to the need for snow removal. FWHP's= 1100/760/40 Upon 3/7/2013 departure DSO notified well left as found T/254/14= Temp -Hot. (Load & kill) Spear into F/L W/ 3 bbls neat meth followed by 33 bbls of crude and then pressure to 1500 psi W/2 bbls of neat meth to FP F /L. Spear into tbg w/ 5 bbls neat meth followed by 252 bbls of 1% KCL followed by 48 bbls of crude for Tbg FP. WV, SV = Closed. SSV, MV= Open. IA and OA OTG. Tags hung , Operator notified of departure. 3/8/2013 FWHP's = 40/300/30 ***WELL SHUT IN ON ARRIVAL * ** ( ELINE TRACTOR ADPERFS) INITIAL T /I /0= 0/200/0 RIH W /TRACTOR AND 15' 2 -7/8" DUMMY GUNS. DRIFT TO 10600'. TIED INTO AND PERFORMED JEWELRY LOG TO 7900' WHILE POOH. LDFN DUE TO TIME. 3/9/2013 ** *JOB CONTINUED ON 10- MAR -2013. WELL SI ON DEPARTURE * ** * ** JOB CONTINUED FROM 9- MAR - 2013 * ** (ELINE DRIFT AND ADPERFS) API DATA FOR 2 -7/8" HSD PJ OMEGA 6 SPF 60 DEG: EH- 0.34" PEN- 36" HEAD ECRD /TRACTOR/ CCL /15' 2 -7/8" HSD PJ OMEGA 6 SPF 60 DEG GUN. LENGHT: 42' OD: 3.125" WEIGHT: 450# FN: 1.38" CCL TO TOP SHOT:4.8' CCL STOP DEPTH: 10430.2' SIT DOWN IN DOGLEG AT 9530' POOH AND ADD 2 1- 11/16" WB AND TRY AGAIN. RIH. HEAD ECRD /TRACTOR/ CCL /2 WB /15' 2 -7/8" HSD PJ OMEGA 6 SPF 60 DEG GUN. LENGTH: 51' OD: 3.125" WEIGHT: 630# FN: 1.38" 0 -RING LEAK FOUND BETWEEN THE CCL AND TOP OF FIRST WEIGHT BAR. 3/10/2013 ** *JOB CONTINUED ON 11- MAR -2013. WELL SI ON DEPARTURE * ** 3/11/2013 ( Assist E -Line ) Job Cancelled. RDMO T /I /0= 0/160/0. (Load tbg). Spear into tbg w/ 3 bbls neat meth followed by 85 bbls crude to load tbg for E -line. FWHP = 0/140/0. E -line in control of well 3/12/2013 upon LRS departure. IA & OA OTG. • • Daily Report of Well Operations ADL0028325 * ** JOB CONTINUED FROM 11- MAR -2013 * ** (ELINE TRACTOR ADPERFS) TIED INTO SLB MPPROF 6/10/2003. PERFORATED 30FT INTERVAL WITH 2 -7/8" 2906 PJ OMEGA, 6 SPF, 60 DEGREE PHASING. FIRST RUN PERFORATED INTERVAL 10435'- 10450'. SECOND RUN PERFORATED INTERVAL 10420'- 10435' WELL LEFT SI ON DEPARTURE. 3/12/2013 ** *JOB CONTINUED ON 13- MARCH - 2013 * ** T /I /O= 40 /160 /0 Temp =S /I Assist E -Line as directed. Flush Perf debris out of TBG with 75 bbls crude. E -Line remains on well at LRS Departure. 3/13/2013 FWHP= 151/140Nac. IA/OA =OTG * ** JOB CONTINUED FROM 11- MAR -2013 * ** TIED INTO SLB MPPROF 6/10/2003. PERFORATED 20 FT INTERVAL WITH 2 -7/8" 2906 PJ OMEGA, 6 SPF, 60 DEGREE PHASING. FIRST RUN PERFORATED INTERVAL: 10345'- 10360'. SECOND RUN PERFORATED INTERVAL: 10330'- 10345' 3/13/2013 ** *JOB CONTINUED ON 14- MAR - 2013 * ** ** *JOB CONTINUED FROM 13- MAR - 2013 * ** RDMO WELL SHUT IN ON DEPARTURE. T /I /O = 140/150/0. 3/14/2013 ** *JOB COMPLETE * ** FLUIDS PUMPED BBLS 6 DIESEL 10 METH 244 CRUDE 252 1% KCL 512 TOTAL Casing / Tubing Attachment ADL0028325 Casing Length Size MD TVD Burst Collapse CONDUCTOR 80 20" 94# H -40 34 - 114 34 - 114 1530 520 LINER 3802 4 -1/2" 12.6# 13Cr80 8233 - 12035 7507.01 - 8819.93 8430 7500 LINER 924 7" 29# N -80 8538 - 9462 7736.32 - 8440.09 8160 7020 PRODUCTION 2376 9 -5/8" 47# R -S -95 28 - 2404 28 - 2403.91 8150 5080 PRODUCTION 4296 9 -5/8" 40# S00-95 2404 - 6700 2403.91 - 6306.56 6820 3330 PRODUCTION 991 9 -5/8" 47# N -80 6700 - 7691 6306.56 - 7074.33 6870 4760 PRODUCTION 1175 9 -5/8" 47# R -S -95 7691 - 8866 7074.33 - 7979.42 8150 5080 • SURFACE 2679 13 -3/8" 72# MN -80 33 - 2712 33 - 2710.92 5380 2670 TUBING 8222 4 -1/2" 12.6# 13Cr80 23 - 8245 23 - 7516.29 8430 7500 • • • Packers and SSV's Attachment ADL0028325 SW Name Type MD TVD Depscription 05 -02A PACKER 8187 7411.09 4 -1/2" Baker S -3 Perm Packer 05 -02A PACKER 8241 7453.08 4 -1/2" Baker ZXP Packer f TREE= 5-1/8" FMC • WELLHEAD= FMC O � A S NOTES: WELL ANGLE *700 @ 10000'. ACTUATOR= AXELSON ***4-1/2" CHROME TBG & LNR M _ L KB. B.E 60.1' B B.eN = NA KOP= 4200' Max Angle = 94° c■ 11529' ' M I 2190' H4 - 1/2" i X PNP, D = 3.813" Datum MD = 10160 DatumTVD= 8800' SS GAS LET MANOR LS 1 13 - 3/8" CSG, 72#, MN O = 12.347" I 2712' ST MD ND DEV TYPE VLV LATCH PORT DATE 5 2996 2993 6 MMG DOME RK w 16 03/23/13 4 4636 4614 18 MMG SO RK r 20 03/23/13 3 5924 5710 38 WIG DMY FE r 0 02/16/02 2 7090 6605 40 MMG DIM' R< r 0 02/16/02 1 8099 7402 38 MG DMY RK r 0 02/16/02 Minimum ID = 3.725" @ 8233' 4 -1/2" HES XN NIPPLE I I ( 8166' H4 -1/2" HT'S x NP, D= 3.813" g g 81ST H9 X 4 BKR S PKR D = 3.875" I I I I 8212' -- I4 - 1 /2" HES X NF D = 3.813" I I I 8233' H4 - 1/2" HES XN NP, D = 3125" 1 I TOP OF BKR TE ACK SLEEVE, D = 7.50" — 1 8233' I I4 -1/2" TBG, 12.611, 13 -CR, .0152 bpf, D = 3.958" I--{ 8244' I I 8245' I �4 1/Y WLEG, D = 4.00' 8241' H9- 518 "X4- 1/2 " BKR ZXPPKRD =6290" I M D 824T — 9 -5/8" X 4-1/2" BKR L HGR, = 6270" I "`111 8256' — 7" X 4 -1/2" XO, ID = 3.910' I 19 - 5/8" X 7" L142 HGR I--L 8538' S 1 9-5/8' CSG, 47 #, L -80, D= 8.681' H 8866 I • ' PERFORATION SUM IARY REF LOG: TCP PERF 7" LAR M91OUT WIDOW (05 -02A) ANGLE AT TOP PEW: 86° © 10310 9462' -9474' { OFF WHPSTOCK } Note: Refer to Production DB for historical pert data N _ SW _.KIERV�AL . ,9 pn/ .. Sgz ,�_SL T - SQZ 11640' H 4 1/2 CEP (08/30/03) 2 -7/8" 10310 - 10340 0 03/14/13 2- /8" 6 f r I - 0430 O 03114/13 i/ 2 -1/2" 4 10690 - 11480 0 02/14/02 2 -1/T 4 11700 - 11760 C 02/14/02 1 t ` 2 -1/T 4 11860 - 11940 C 02/14/02 At, ••••• 111111 7" LM, 29#, N-80, D = 6.184" H 10194' ■ I PBTD H 11945' •+ •+•�•�•�•i 4 14 -112" L■R 12.6#, 13- CR -80, .0152 bpf, O = 3.958" H 12035' I DATE RI=/ BY COM 'U ITS DATE REV BY CO VENTS PRIDHOE BAY UNIT 10/18/74 ORIGINAL COMPLETION 11/05/09 DTR/SV GLV CIO & ND CORR WELL: 05-02A 01/08188 RWO 04/03/13 RMYJMD ADPERFS (03/14/13) FERMI' No: "2012410 02/16/02 RIG SIDETRACK(05 -02A) 04/03/13 RKT /JMD GLV CIO (03/23/13) AR No: 50- 029 - 20144 -01 03/01/02 CWTP CORRECTIONS SEC 32, T11N, R15E, 2614' NSL & 1109' EWL 06/12103 CPAO/TLP KB ELEVATION CORRECTION 08/30/03 DAV/KK SET CRP BP Exploration (Alaska) 10/15/08 ~~h~~m~~~~~~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job # F: ry f 1 nn rlucrrintinn N0.4931 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnkeni 333 West 7th Ave, Suite 100 Anchorage, AK 99501 n.,~.. n~ 07-306 12005233 SCMT - U r 09/22/08 1 1 W-31 12031513 USIT r ~Cc 09/18/08 1 1 05-35A 11975794 USIT 09/11/08 1 1 M-08 12096917 PRODUCTION PROFILE - 10/06/08 1 1 P2-46 11970849 INJECTION PROFILE 10/09/08 1 1 D-08A 11962617 RST 08/21/08 1 1 OS-02A 12103674 RST I (~ 08/24/08 1 1 07-30B 12005233 MCNL 09/23/08 1 1 13-14 11978482 RST - 09/13/08 1 1 .._...... .. ~~~...~ ..~.. ~.. .... .....................~. v...vnu vn~ vvr r cn~.n ~ v: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered Alaska Data & Consulting Services 2525 Gambell Street, Suite 40 Anchorage, AK 99503- 8 ATTN: Beth Received by: ~j • i, (-~~ . . _···"·r·············'~' .'It-' ~. 'i- . MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ MaIker.doc Permitto Drill 2012410 MD 12035 ,.- REQUIRED INFORMATION 11 (~JJH t DATA SUBMITTAL COMPLIANCE REPORT 2/26/2004 Well Name/No. PRUDHOE BAY UNIT 05-02A Operator BP EXPLORATION (ALASKA) INC TVD 8820 ,..-- Completion Date 2/1612002 ,- Completion Status Mud Log No Samples No DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Log/ Data Type I R~t ~ E ) ED v: ED ED ....... ~Og rg kog I kog I I I Electr Digital Dataset MedlFrmt Number D D C Asc C Pdf ED C Pdf C Pdf C Pdf C Pdt C Pdf v{1094 "'11457 [M995 f1995 11995 V;~995 11995 11995 ~995 Name Log Log Run Scale Media No 1 5 BM 3-5 25 Final 25 Final 25 Final 25 Final 25 Final 25 Final Blu Blu Blu Blu 1-01l Current Status 1-01L ~ J ( J"""-t~J... API No. 50-029-20144-01-00 UIC N Directional Survey ~ (data taken from Logs Portion of Master Well Data Maint) Interval OH 1 Start Stop CH Received 9412 11930 Open 113/2003 10574 9412 11944 Case 7/22/2002 11930 Open 113/2003 11944 Case 7/22/2002 12035 Open 6/2/2003 12035 Open 6/2/2003 10574 9400 9450 9450 8820 Open 6/2/2003 9450 12035 Open 612/2003 9450 8820 Open 6/2/2003 9450 12035 Open 6/2/2003 9450 8820 Open 6/2/2003 10492 11941 Case 7/2312003 10492 11941 Case 7/2312003 10492 11941 Case 7/23/2003 10492 11941 Case 7123/2003 l Comments MWD-ROP, DGR, EWR- MD MWD-DGR, EWR-TVD I MWD-DGR, SLD, CTN-MD ! MWD-DGR, SLD, CTN- TVD MWD-DGR, SLD, CTN-MD MWD-DGR, SLD, CTN- TVD Memory Production Profile Memory GRlCCLlTEMP/PRES/SPIN ) Memory Production Profile Memory GRlCCLlTEMP/PRES/SPIN Memory Production Profile Memory GRlCCLlTEMP/PRES/SPIN Memory Production Profile Memory GRlCCLlTEMP/PRESISPIN DATA SUBMITTAL COMPLIANCE REPORT 2/26/2004 Permit to Drill 2012410 Well Name/No. PRUDHOE BAY UNIT 05-02A Operator BP EXPLORATION (ALASKA) INC API No. 50-029-20144-01-00 MD 12035 TVD 8820 Completion Date 2/16/2002 Completion Status 1-01L Current Status 1-01L UIC N Î Blu 1 10492 11941 Case 712312003 Memory Production Profile ' Memory GRlCCLlTEMP/PRES/SPIN ~D C Asc 9378 11919 Case 1112412003 ~ 2 Blu 1 10492 11941 Case 1112412003 Memory CNL Borax Log Mem GRICCUCNL c..Y>g 2 BJu 1 10492 11941 Case 11/24/2003 Memory CNL Borax Log Mem GRICCUCNL ) vED D Las ;1'2278 11273 11877 10/6/2003 Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORMATION Well Cored? Y /~ Chips Received? ~ Daily History Received? ð'N &HN Formation Tops Analysis Received? Y /t<I- Comments: ) Compliance Reviewed By: ~ ~ Date: a..-) ~~<{ ~ -' ,-....., STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION corvo. ..aSION REPORT OF SUNDRY WELL OPERATIONS ,- 1. Operations Performed: Abandon 0 Alter Casing D Change Approved programD 2. Operator SuspendD RepairWellD Pull TubingD Operation Shutdown 0 Plug PerforationsŒJ Perforate New Pool D 4. Current Well Class: Perforate 0 WaiverD Stimulate D Time Extension 0 Re-enter Suspended Well 0 5. Permit to Drill Number: 201-2410 OtherD Name: BP Exploration (Alaska), Inc. Development ŒJ StratigraphicD 9. Well Name and Number: 05-02A 10. FieldIPool(s): Prudhoe Bay Field / Prudhoe Oil Pool ExploratoryD ServiceD 6. API Number 50-029-20144-01-00 3. Address: P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): 60.12 8. Property Designation: ADL-o28325 11. Present Well Condition Summary: Total Depth measured 12035 feet true vertical 8819.9 feet Effective Depth measured 11640 feet true vertical 8835.5 feet Plugs (measured) 11640 Junk (measured) None Casing Length Size MD TVD Burst Collapse Conductor 80 20" 94# H-40 34 114 34.0 - 114.0 1530 520 Liner 3802 4-1/2" 12.6# 13Cr80 8233 - 12035 7507.0 - 8819.9 8430 7500 Liner 1656 7" 29# MN-80 8538 - 10194 7736.3 - 8865.3 8160 7020 Production 2376 9-5/8" 47# R-S-95 28 - 2404 28.0 - 2403.9 8150 5080 Production 4296 9-5/8" 40# SOO-95 2404 - 6700 2403.9 - 6306.6 6820 3330 Production 991 9-5/8" 47# N-SO 6700 7691 6306.6 - 7074.3 6870 4760 Production 1175 9-5/8" 47# R-S-95 7691 8866 7074.3 - 7979.4 8150 5080 Surface 2679 13-3/8" 72# MN-80 33 2712 33.0 - 2710.9 5380 2670 Measured depth: 10690 -11480 RECEIVED JAN 2 0 2004 True vertical depth: 8873.85 - 8843.41 Tubing ( size, grade, and measured depth): 4-1/2" 12.6# 13Cr80 @ 23 8245 Packers & SSSV (type & measured depth): 4-1/2" Baker S-3 Perm Packer @ 8187 4-1/2" Baker ZXP Packer @ 8241 Alaska Oil & Gas Cons. Commission Anchorage 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: Representative Dailv Averaae Production or Iniection Data Gas-Met Water-Bbl Casing Pressure 27.3 0 1040 13 1280 49.3 0 1050 Tubing Pressure 2020 1250 Prior to well operation: Subsequent to operation: Oil-Bbl 676 . R£nÆS Bfl Copies of Logs and Surveys run - JAM 2 1O0~ 15. Well Class after proposed work: ExploratoryD Development[! ServiceD 14, Attachments: Daily Report of Well Operations. ~ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Garry Catron Printed Name aAGarry Catron Signature ,/-J ~ ~ ~ Form 10-404 Revised 12/2003 16. Well Status after proposed work: Operational Shutdown D Oil]] GasD WAG 0 GINJD WINJD WDSPLD Prepared by Garry Catron (907) 564-4657. SUndry Number or N/A if C.O. Exempt: N/A Title Production Technical Assistant 0 R \ G \ N J~ tne 564-4657 Date 1/16104 .", ~ ,- , , 05-02A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 08/28/03 RIH WI PDS GR -CCL W/3.5in CENTRALIZER. LOG INTERVAL 11900'-11300' FLAG CT @ 11670'. MU/RIH W/4.5in BAKER CIBP. 08/29/03 Set CIBP @ 11640' BBlS 304 265 10 10 20 FLUIDS PUMPED 50/50 Methonal 1 % KCl Diesel Xylene TOTAL Page 1 ~.. , :. ~- ~ TREE = W8..LHEAO = ACn.IA.TOR = KB. ELEV = BF. ELEV = KOP= Max Ange = Datum MD = Datum TVD = 5-118" Ftv'C Ftv'C AXELSOÑ 60.1' Nb. 4200' 94 @ 11529' 10160' 8800' SS 113-318" CSG, 72#, MN-80, 10 = 12.347" H 2712' Minimum ID = 3.725" @ 8233' I 4-1/2" HES XN NIPPLE TOPOFBKRTIEBAO<SLEEVE,ID=7.50" H 8233' I 4-1IZ'TBG,12.6#,13-CR,.0152bpf,ID=3.958"H 8244' I 19-518" X 7" LNRHGR H 8538' 19-518" CSG, 47#, L-80, D =8.681"H 8866' PERFORATION SUMvlARY REF LOG: TCP PERF ANGLEA TTOP ÆRF: 93@ 10690' J\bte: Refer to Production DB for historical perf data SIZ E SPF INTERIt AL OpnlSqz DA. TE 2-112" 4 10690-11480 0 02114102 2-112" 4 11700 - 11760 C 02114102 2-112" 4 11860-11940 C 02114102 17" LNR, 29#, N-80, ID= 6.184" H 10194' 05-02A ~ L - z I Z'-I ,......... , , SAFETY NOTES: WELL ANGLE > 70° @ 10000' & > 90° @ 10592', ***4-1/2" CHROMETBG & LNR*** ST MD ~ 5 2996 4 4636 3 5924 2 7090 1 8099 8166' 8187' 8212' 8233' 8245' 8241' 8247' 8256' 2190' H4-1/2" HES X NIP, 10=3.813" GAS LIFT MANDRELS TVD DEV TYPE VLV LATCH FORT DATE 2929 6 MvlG RP RK 0 02/16/02 4550 18 MvlG OJ RK 0 02/16/02 5647 39 MvlG OJ RK 0 02116/02 6542 40 MvlG OJ RK 0 02116/02 7339 39 MvlG OJ RK 0 02116/02 H4-112" HES X NIP, 10= 3.813" H9-5/8" X 4-112" BKRS-3 PKR, D = 3.875" I H4-112" HES X NIP, 10= 3.813" H4-112" HES XN NIP, D = 3.725" I H4-112"WLEG,ID=4.00" - 9-518" X 4-112" BKRZXP A<R, ID = 6.290'" - 9-518" X 4-112" BKR LNR I-GR, ID = 6.270" -T'X4-1IZ'XO,D=3.910" I IT' LNR MLLOLJr WINOOW (05-02A) 9462' - 9474' (OFFWHPSTOO<) 11640' H4-1IZ' OBP(08l30103) I ~ [!§]-i 11945' 14-112" LNR, 12.6#, 13-CR-80, .0152 bpf, ID = 3.958" H 12035' ~ I ~~ DATE REV BY COMrvENTS 10/18174 ORIGINAL COMPLETION 01108188 RWO 02/16102 RIG SlDEfRACK(OS-02A) 03101102 CHIrP CORRECTIONS 06112103 CMOITLP KB ELEV A TON CORRECTON 08130103 DA. VIKK SEf OBP DATE I ~. ~ 1 I .. REV BY COMvlENTS PRUDHOE BAY UNrr WI3..L: 05-02A ÆRMTNo: 2012410 API No: 50-029-20144-01 SEC 32, T11 N. R15E, 2614' NSL & 1109' EWL BP Exploration (Alaska) Schlumbel'gel' NO. 3028 Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth Company: State of Alaska Alaska Oil & Gas Cons Comm Artn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Well Job# Log Description P1-02A ;q~-()(&'") 10672311 RST-SIGMA G-12B ~\ -J~~ 10563472 MCNL D.S. 5-02~ - ~ 10558550 MCNL D.S.5-168 ) - ~ C. 10558555 MCNL E.14A (9 -- I:?-> 10560299 RST-SIGMA P1-06 1~ (1) - L ~ 10674382 RST-SIGMA P1-09 1 lo --I h 10560312 RST -SIGMA Color ) Date Blueline Prints CD 09/14/03 1 I 1 ¡,~ 09/29/03 1 1 06/10/03 1 1 06/16/03 1 1 09/12/03 1 1 i:~~~ 10/04/03 1 1 10/15/03 1 1 ;"fJ., & <-t J= PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, AI~ka 99508 RECEIVED Sch/umberger GeoQuest 3940 Arctic Blvd. Suite 300 Anchorage. AK 99503-5711 ATTN: Beth Date Delivered: NOY 242003 ~ \"' ~ . Received by: ~\ \.J.. ."" . \ )\ Q ~':::::--"~IV\ AÞ.J8k~ Oil & Gas Gems. Ù!mfTIieeion ÞJtchorege SCAØ\í.NEC DEC 052003 ~ &Dt - è9L\1 ~ WELL LOG TRANSMIITAL ProActive Diagnostic SelVices, Inc. To: State of Alaska ADGCC 333 W. 7'" Street Suite # 700 Anchorage, Alaska 99501 RE: Distribution - Final Print(s) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of : Joey Burton / Jeni Thompson ProActive Diagnostic Services, Inc. P. O. Box 1369 Stafford, TX 77497 BP Exploration (Alaska), Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, AK 99508 WELL DATE loG TYPE DIGITAL OR CD-ROM 1 MYLAR / SEPIA FILM 1 BLUE LINE PRINT(S) REPORT OR COLOR Open Hole 1 Res. Eva!. CH 1 1 1 05-02a 8-28-03 Mech. CH Jed -:¡-r! Caliper Survey Signed: -~\.~ N, ~ l(} ~ ~,~ f:~nv..Þ;:r11 "Jb,~ ' Ib.É...... Date: OCT 0 6 2003 Print Name: AI{1~a ~~ Commíssion AnGhomlle .., PRoACTivE DiAGNOSTic SERviCES, INC., PO Box 1 }69 STAffoRd IX 77477 Phone:(281) 565-9085 Fax:(281) 565-1369 E-mail: pds@memorylog.com Website: www.memory1og.com ~ "-,... '--.., c. K\~.}":::,,\\'\ Ô) ScblUllbepgep Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth Well Z-39 ~m-d D.S.2.14 0-("") \5<;" ~ \ ~-(')(Qn N-11B " \e/.~ D.S. 15-oskQÄ '1~~ D-O3A ~ca-I, ~tL K-317B ;QC"')\... ~ ( {) D.S. 5-04A\Cf 10' J D-13A ßÖ"')-~( D.S.5-O2A Ct°\ ~A. 4 ~ NO. 2916 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Endicott Job# Color Date Blueline Prints CD 07/19/03 1 07/17/03 1 07/16/03 1 07/16/03 1 07/14/03 1 06/19/03 1 06/09/03 1 06/14/03 1 06/23/03 1 06/10/03 1 Log Description PROD LOG W/DEFT RST GRAVEL PACK LDL SBHP SURVEY RST GRAVEL PACK MEM PROD PROFILE PROD PROFILE W/DEFT MEM PROD PROFILE MEM PROD PROFILE MEM PROD PROFILE PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: ~~~~~ Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth v-~ :;-. ~ r"" ~,,'~ '¡~,'!"'" ~..~ r~..,J'o"...-osl-, """"1\""=',\1,' ~'~'% ~ V b ~ 'd "'-= ,6.> 07122103 j ) 'l -- Received~\~~s. ~t(ì~"f\ :¡;' 2.~ ""-"~,- \.. ,; ;....J ..~.. ~. .:) ÞJ33.b:J J:: :; . ,"~;;¡:;;:\Ï~~:1 ~ ,-... é)CJ I -BL-I \ \ \ 9~.5 WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 J\nchorage,Alaska 99501 May 20, 2003 RE: MWD Formation Evaluation Logs: 05-02A, AK-MW-22007 05-02A: Digital Log Images 50-029-20144-01 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. J\nchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. J\nchorage, Alaska 99508 Date: ~ -.~ Signed: ~.\~ /V\.~,-<::J~'(,,- F~ECEIVED JUN 0 2 2003 ~'\s~ ~\ ~ Alaska Œ! & Gas ContI. Commission AI1í.'horlrge ,~ ~ ~ ~Ol-d-/ / /1'-157 WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska December 20, 2002 RE: MWD Formation Evaluation Logs 05-02A, AK-MW-22007 1 LDWG formatted Disc with verification listing. ~I#: 50-029-20144-01 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Speny-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-Technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date: Signed~ ~ RECEIVED JAN 03 2003 A18a Oñ & Gas Cons. ~ AncllMIge ..---- ~--~ ;~ ~ aOJ~~tj/ / J D9iJ WELL LOG TRANSMITTAL ProActive Diagnostic Services, Inc. To: State of Alaska AOGCC 333 W. 7"'Street Suite # 700 Anchorage. Alaska 99501 RE: Distribution - Final Print(s) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of : Joey Burton / Jeni Thompson ProActive Diagnostic Services, Inc. P. o. Box 1369 Stafford, TX 77497 BP Exploration (Alaska), Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, AI< 99508 LOG DIGITAL MYLAR / BLUE LINE REPORT WELL DATE TYPE OR SEPIA PRINT(S) OR CD-ROM FILM CoLOR Open Hole 1 1 1 OS 05-02a 7/9/02 Res. Eva!. CH 1 1 1 Mech. CH 1 Caliper Survey Signed: ~ (,OQ9p,.l RECEIVED Date : JUL 2 Z 2002 Print Name: Alaska 01) & Gas Cons. Commission AnchOl'8ge PROAcTivE DiAGNOSTÎç SERVicES, INC., } 10 K STREET SuÌTE 200, ANCHORAGE, AK 99501 Phone:(907) 245-8951 Fax:(907) 245-8952 E-mail: pdsanchorage@memorylog.com Website: \vww.memorvlog.com SCANNED JUll 2 2004 1---, ,~ " STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well 181 Oil 0 Gas 0 Suspended 0 Abandoned 0 Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 201-241 3. Address 8. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20144-01 4. Location of well at surface '. : t\ocATtòN$~ 9. Unit or Lease Name 2614'NSL,1109'EWL,SEC.32,T11N,R15E,UM ¡' J¡)i, ",":,'.',,' "-"Y~,,'" ,,',' ~', Prudhoe Bay Unit ~i~,PNo~~r~~~~i~~~:e;;~. 32, T11N, R15E, UM ¡ ~~&'~J ' At total depth ! :J}A- ,¡FE;!, ~ ~ r>- ¡ 10. Well Number , t u. " , ' 05-02A 249' NSL, 197' EWL, SEC. 28, T11N, R15E, UM ¡:-~,,~::-=;:::::-:i -",<,---- 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field / Prudhoe Bay Pool KBE = 60.12' ADL 028325 12. Date Spudded 113. Date T.D. Reached 114. Date Comp., Susp., or Aband. 115. Water depth, if offshore 116. No. of Completions 1/31/2002 2/6/2002 2/16/2002 N/A MSL One 17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD) 119. Directional Survey 120. Depth where SSSV set21. Thickness of Permafrost 12035 8820 FT 11947 8825 FT 181 Yes 0 No (Nipple) 2190' MD 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, DIR, GR, RES, DEN, NEU 23. CASING SIZE 20" 13-3/8" 9-5/8" Classification of Service Well 7" N-80 13Cr80 CASING, liNER AND CEMENTING RECORD SETTING DEPTH HOLE Top BOTTOM SIZE CEMENTING RECORD Surface 114' 36" 502 sx Permafrost Cement Surface 2712' 17-1/2" 5463 sx Permafrost II Surface 8866' 12-1/4" 1200 sx Class 'G', 125 sx PF II 8538' 9462' 8-1/2" 410 sx Class 'G' 8233' 12035' 6" 448 sx Class 'G' AMOUNT PULLED WT. PER FT. 94# 72# 47# / 40# 29# 12.6# GRADE H-40 MN.80 MN-80 I SOO-95 4-1/2" 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 2-1/2" Gun Diameter, 4 spf MD TVD 10690' - 11480' 8874' - 8843' 11700' - 11760' 8834' - 8832' 11860' - 11940' 8829' - 8826' SIZE 4-1/2", 12.6#, 13Cr80 TUBING RECORD DEPTH SET (MD) 8245' PACKER SET (MD) 8187' 25. MD TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect with 160 BBls of Diesel 27. Date First Production March 3, 2002 Date of Test Hours Tested PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) Flowing PRODUCTION FOR OIL-BBL TEST PERIOD GAs-MCF WATER-BBL Flow Tubing Casing Pressure CALCULATED Press. 24-HoUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. submi~~CEIVED No core samples were taken. OIL-BBL GAs-McF WATER-BBL CHOKE SIZE I GAS-OIL RATIO OIL GRAVITY-API (CORR) Form 10-407 Rev. 07-01-80 t-1AR 2 6 2002 AIa8ka Oil & Gas cons. emtl11tæion 0 R I GI NA L RBDMS 9::0ê~~nD"pc:~ /,"" 29. Geologic Markers Marker Name Measured Depth Top of Sadlerochit 9433' TCGL 9610' BCGL 9664' 23SB 9743' 22TS 9797' 21TS 9852' Zone 18 9949' TDF 10060' Base of Sadlerochit 10492' 31. List of Attachments: ,,-...., 30. Formation Tests True Vertical Depth Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. 8417' 8561' 8607' 8673' 8716' 8756' 8812' 8850' 8877' Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Terrie Hubble ~ ~ ~ Title Technical Assistant 05-02A 201-241 Well Number Permit No. / Approval No. Date ð3.as'o~ Prepared By Name/Number: Terrie Hubble, 564-4628 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 28: If no cores taken, indicate 'none'. ITEM 27: Method of Operation: Flowing, Gas Lift, ROd Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. Form 10-407 Rev. 07-01-80 « NN 00 I I LOLO 00 Qj E .. ro ~z ro c:: z 0 - E ro E 0>0 ~() '@ c. 8: 0 0 ci ...... ~ ïii 8: CD 00 C") ..¡ ';¡¡ 8: C") 0 r-- '@ c. 8: 0 "'" ex) g 0 ci "'" "'" 05 g 0 N CD "'" a) I- u: C\I 0 0 ~ 0 £2 ...... ~ .~ ~ ~ ài "! ;:: § g ~ i:i !! c ;t .~ .~ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 05-02 05-02A REENTER+COMPLETE NABORS NABORS 2ES Start: 1/15/2002 Rig Release: 2/16/2002 Rig Number: Spud Date: 9/8/1974 End: 2/16/2002 1/23/2002 22:00 - 22:30 0.50 RIGU P PRE INSPECT RIG AND ACCEPT AT 22:00 HRS 1123/2002. HOLD PRE-SPUD SAFETY MTG W/ CREW. 22:30 - 00:00 1.50 RIGU P PRE RU LINES FOR CIRCULATING OUT DIESEL FREEZE PROTECT. RU DSM LUBRICATOR FOR PULLING BPV. 1124/2002 00:00 - 01 :00 1.00 RIGU P PRE PTSM. CONT. RU LINES FOR CIRCULATING OUT DIESEL FREEZE PROTECT. 01:00 - 01:30 0.50 RIGU P PRE PULL BPV W/ DSM. 01 :30 - 09:00 7.50 RIGU P PRE CIRC OUT DIESEL FREEZE PROTECT, AND DISPLACE TO CLEAN SW. 09:00 - 09:30 0.50 RIGU P PRE ATTEMPT TO SET BPV-FAILED. BPV WAS SET HIGH. 09:30 - 10:00 0.50 RIGU N PRE CALL DSM TO PULL AND RESET BPV. 10:00 - 10:30 0,50 RIGU P PRE PULL BPV WI DSM. 10:30-11:30 1.00 RIGU P PRE RE-DRESS BPV, AND INSTALL. TEST FROM BELOW AT 1,000 PSI- OKAY. 11:30-14:30 3.00 RIGU P PRE PTSM. ND TREE AND INSTALL BLANKING PLUG. 14:30 - 18:00 3.50 RIGU P PRE NU BOPE. 18:00 - 23:00 5.00 RIGU P PRE RU TO TEST BOPE. LEAK FOUND BETWEEN STACK AND TBG HNGR. TEST CHOKE MANIFOLD 250/3,500 PSI, FOR 5/10 MIN - OKAY. LIFT STACK, DRESSED PITTED RING GROOVE, INSPECT RING SEAL. NU AND TEST SEAL-OKAY. 23:00 - 00:00 1.00 RIGU P PRE TEST LOWER AND UPPER PIPE RAMS, BLIND RAMS 25013,500 PSI FOR 5/10 MIN - OKAY. 1/25/2002 00:00 - 02:00 2.00 RIGU P PRE FIN TESTING BOPE - UPER RAMS, ANNULAR AND TO TO 250/3,500 PSI - OKAY. 02:00 - 03:30 1.50 RIGU P PRE MADE 3 ATTEMPTS TO PULL BLANKING PLUG WI DSM. - NO GOOD. 03:30 - 04:30 1.00 RIGU P PRE PU ONE JT OF DP, SCREW INTO AND PULL BANKING PLUG. 04:30 - 05:30 1.00 RIGU P PRE PULL BPV W/ LUBRICATOR, RD SAME. 05:30 - 07:30 2.00 PULL P DECOMP PU SPEAR, SPEAR INTO HNGR, BACK OUT LDS, PULL FREE AT 140K. PULL HNGR TO RIG FLOOR, DISCONECT CONTROL LINES. LD HNGR AND 5-1/2" PUP JTS. 07:30 - 09:00 1.50 PULL P DECOMP CBU AT 7 BPM AND 450 PSI. RU 4-1/2" HANDLING EQUIP, AND CONTROL LINE SPOOLING UNIT. 09:00 - 20:30 11.50 PULL P DECOMP POOH LD 4-1/2" TBG, SSSV, CONTROL LINES WI ALL 77 SS BANDS. RECOVERED 267 JTS OF 4-1/2",12.6 LB/FT, L-80 TBG, + 15.46' CUTOFF. 20:30 - 21 :30 1.00 PULL P DECOMP CLEAN RIG FLOOR. 21 :30 - 22:30 1.00 PULL P DECOMP INSTALL WB. 22:30 - 23:30 1.00 PULL P DECOMP PU FISHING TOOLS. 23:30 - 00:00 0.50 PULL P DECOMP MU OVERSHOT BHA. 1/26/2002 00:00 - 01 :30 1.50 PULL P DECOMP PU OVERSHOT BHA FOR RETRIEVING TBG STUB. 01 :30 - 06:00 4.50 PULL P DECOMP PICK UP 4" DP FROM THE PIPE SHED, RIH. 06:00 - 07:00 1.00 PULL P DECOMP CUT AND SLIP DRILL LINE. 07:00 - 08:00 1.00 PULL P DECOMP SERVICE TO. 08:00 - 09:30 1.50 PULL P DECOMP CONT. RIH TO 8,445'. 09:30 - 10:00 0.50 PULL P DECOMP CIRCULATE, SLIDE OVER 4-112" TBG STUMP AND PULL OUT OF PBR. 10:00 -13:30 3.50 PULL P DECOMP MONITOR WELL, POOH. 13:30 - 14:30 1.00 PULL P DECOMP STAND BACK DC, HANDLE BHA. 14:30 - 15:00 0.50 PULL P DECOMP LD FISH. RECOVERED 15' CUTOFF SECTION, 6' PUP JT, Printed: 2/2D/2DO2 11:29:50AM ,,--.. .---- Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 05-02 05-02A REENTER+COMPLETE NABORS NABORS 2ES Start: 1/15/2002 Rig Release: 2/16/2002 Rig Number: Spud Date: 9/8/1974 End: 2/16/2002 1/26/2002 14:30 -15:00 0.50 PULL P DECOMP PBR SEAL ASSEMBLY. 15:00 - 16:30 1.50 PULL P DECOMP MU SPEAR BHA. 16:30 - 19:00 2.50 PULL P DECOMP RIH 19:00 - 19:30 0.50 PULL P DECOMP TAG FISH AT 8,475'. UPW 175K, DWN 155K. ENGAGE FISH, JAR PKR FREE ON THIRD ATTEMPT WI100K OP. (UPW 185K). 19:30 - 21:30 2.00 PULL P DECOMP CIRC BTM UP, MONITOR WELL, PUMP SLUG. 21 :30 - 00:00 2.50 PULL P DECOMP POOH WI FISH. 1/27/2002 00:00 - 02:00 2.00 PULL P DECOMP POH WI FISH. 02:00 - 03:30 1.50 PULL P DECOMP UD BHA. 03:30 - 07:30 4.00 PULL P DECOMP UD PACKER ASSEMBLY. RlU AND UD 3-1/2" TUBING TAILPIPE. RECOVERED 33 JTS 3-1/2" TUBING, PUP JT, PACKER, 15.41' CUT OFF JT. 07:30 - 09:00 1.50 PULL P DECOMP RlU SCHLUMBERGER 09:00 - 12:00 3.00 PULL P DECOMP RAN 6" GRlJB TO 9540'. WORKED DOWN WITH SOME DRAG. POH SLOW TO LINER TOP. 12:00 - 14:30 2.50 PULL P DECOMP RIH WI EZSV TO 8644'. ATTEMPT TO WORK THRU 7" CASING. WORKED FREE SEVERAL TIMES, ABORT ATTEMPT. POH, INSPECTED TOOLS, OK. RID SCHLUMBERGER. 14:30 - 17:30 3.00 CLEAN P DECOMP PIU BHA #3. 17:30 - 21:30 4.00 CLEAN P DECOMP RIH WI 6" WINDOW MILLS TO CLEANOUT 7" LINER. TAGGED STUMP @ 9540'. NO PROBLEMS RIH. 21 :30 - 23:00 1.50 CLEAN P DECOMP CIRC SWEEP, 12 BPM. 23:00 - 00:00 1.00 CLEAN P DECOMP POH TO 7650' @ REPORT TIME. 1/28/2002 00:00 - 03:00 3.00 PULL P DECOMP POH WI 6" MILLS, CLEANOUT RUN 03:00 - 03:30 0.50 PULL P DECOMP POH, STAND BACK BHA 03:30 - 05:00 1.50 PULL P DECOMP RlU SCHLUMBERGER 05:00 - 08:00 3.00 PULL P DECOMP RIH WI EZSV ON WIRELINE. SET DOWN @ 8640' WLM. WORK TOOLS FREE. INCREASING DRAG ON TOOLS EACH TIME GO DOWN. ABORT ATTEMPT TO SET EZSV ON WIRELINE. POH. 08:00 - 08:30 0.50 PULL P DECOMP RID SCHLUMBERGER. 08:30 - 10:30 2.00 PULL P DECOMP PREPARE MWD TOOLS. 10:30 - 11 :00 0.50 PULL P DECOMP PIU BHA #4, TEST MWD. MWD FAILED. 11:00-14:00 3.00 PULL N SFAL DECOMP UD AND TROUBLE SHOOT MWD. 14:00 - 18:30 4.50 PULL P DECOMP RIH WI EZSV. 18:30 - 20:30 2.00 PULL P DECOMP CORRELATE TO GR LOG. SET EZSV @ 9475'. SHEARED OFF WI 40K OVERPULL. SET DOWN 15K TO VERIFY SET. 20:30 - 22:00 1.50 PULL P DECOMP CIRC, DISPLACE WELL TO 8,4 PPG MILLING FLUID. 22:00 - 00:00 2.00 PULL P DECOMP POH. 112912002 00:00 - 03:30 3.50 PULL P DECOMP POH WI EZSV SETTING TOOL BHA. 03:30 - 04:30 1.00 PULL P DECOMP POH WI BHA. UD MWD, RUNNING TOOL. CLEAR FLOOR. 04:30 - 05:00 0.50 PULL P DECOMP PIU RTTS. 05:00 - 08:30 3.50 PULL P DECOMP RIH TO 8300'. 08:30 - 11 :30 3.00 PULL P DECOMP SET RTTS @ 8300'. TESTED CASING AND LINER BELOW RTTS TO 1000 PSI, BLED TO 850 PSI IN 15 MIN. TESTED 9-5/8" CASING ABOVE RTTS TO 3500 PSI 30 MIN, 3415 PSI FINAL PRESSURE. 11:30-13:30 2.00 PULL P DECOMP CUT AND SLIP DRILLING LINE. 13:30 - 14:30 1.00 PULL P DECOMP SERVICE TOP DRIVE. 14:30 - 20:00 5.50 PULL P DECOMP POH. UD RTTS. 20:00 - 21 :00 1.00 STWHIP P WEXIT PIU WHIPSTOCK, 6" MILLS, MWD. Printed: 2/20/2DO2 11:29:50AM ~ ~ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 05-02 05-02A REENTER+COMPLETE NABORS NABORS 2ES Start: 1/15/2002 Rig Release: 2/16/2002 Rig Number: Spud Date: 9/8/1974 End: 2/16/2002 1/29/2002 21 :00 - 00:00 3.00 STWHIP P WEXIT RIH. SURFACE CHECK MWD. RIH TO 4213' @ REPORT TIME. 1130/2002 00:00 - 03:00 3.00 STMILL P WEXIT PTSM. RIH TO 9,425', STOPPING TO FILL PIPE AND CHK MWD.- OKAY. 03:00 - 03:30 0.50 STMILL P WEXIT ORIENT WHIPSTOCK TO 85L. 03:30 - 04:00 0.50 STMILL P WEXIT CO NT. RIH TO 9,475' AND SET DWN 15K ON EZSV. SHEAR AND SET ANCHOR WI 30K DOWN 04:00 - 17:30 13.50 STMILL P WEXIT MILL WINDOW AT 2'/HR FROM 9,462' - 9,474'. DRILL NEW FM TO 9,487' AT 2.16'/HR. WORK THRU WINDOW WI NO OBSTRUCTIONS. 17:30 -18:00 0,50 STMILL P WEXIT FIT AT 9,462' /8,440' - TMDITVD TO 702 PSI, AND 8.4 PPG MUD IN HOLE. EMW=10 PPG. 18:00 - 19:00 1.00 STMILL P WEXIT DROP DART, OPEN PUMP OUT SUB, CBU @ 12 BPM AND 1,720 PSI. PUMP SLUG. 19:00 - 23:00 4,00 STMILL P WEXIT POOH TO BHA. 23:00 - 00:00 1.00 STMILL P WEXIT LD MILLING BHA. 1/31/2002 00:00 - 02:00 2.00 STMILL P WEXIT FINNISH LD MILLING BHA. 02:00 - 03:00 1.00 STMILL P WEXIT PULL WB. WASH DOWN THE STACK. 03:00 - 07:00 4.00 DRILL P PROD1 MU DRILLING BHA WI 1.83 DEG MOTOR, MWD/LWD. ORIENT MWD. SURFACE TEST - OKAY. 07:00 - 08:30 1.50 DRILL P PROD1 PU 4" DP FROM PIPE SHED TO 2,283'. 08:30 - 09:30 1.00 DRILL P PROD1 SERVICE TO. 09:30-11:00 1.50 DRILL N RREP PROD1 REPAIR TOPDRIVE HYDRAULICS FOR TO BOOST, AND BY PASS SYSTEM. 11 :00 - 14:30 3.50 DRILL P PROD1 CO NT. RIH TO 9,346. 14:30 - 15:30 1.00 DRILL P PROD1 ORIENT TF 85 DEG L HS. PASS THRU WINDOW W/O PROBS, 15:30 - 21:00 5.50 DRILL P PROD1 DRILL TO 9,674'. AST=2.86 HRS, ART=1.0 HR. 21:00-21:30 0.50 DRILL P PROD1 TAKE 4 CHK SHOTS 9,672'-9,646'. 21 :30 - 22:00 0.50 DRILL P PROD1 CO NT. DRLG TO 9,682'. PU AND PULL TO 225K (45K OP). 22:00 - 23:00 1.00 DRILL P PROD1 WORK PIPE, PULLING TO 225K. (MOVED 1-2 FEET) PULL FREE, CONT. TO WORK THRU TIGHT SPOT. 23:00 - 23:30 0.50 DRILL P PROD1 CIRC HI-VIS SWEEP PAST BIT. 23:30 - 00:00 0.50 DRILL P PROD1 REAM BACK TO BTM WI NORMAL TRO OF 5K. 2/1/2002 00:00 - 23:00 23.00 DRILL P PROD1 DRILL FROM 9,680' -10,228'. WI 1.83 DEG MOTOR, MWDILWD. 23:00 - 23:30 0.50 DRILL P PROD1 POOH TO 9,280', W/O EXCESSIVE DRAG, OR PROBLEMS PASSING THRU THE WINDOW. 23:30 - 00:00 0.50 DRILL P PROD1 DROP DART AND OPEN CIRC SUB. CBU. 212/2002 00:00 - 01 :00 1.00 DRILL P PROD1 CO NT. CBU AT 9,280', @ 1,500 PSI AND 13 BPM. PUMP SLUG. MONITOR WELL - WELL STATIC, 01 :00 - 04:00 3.00 DRILL P PROD1 POOH TO BHA, WHILE TESTING CHOKE MANIFOLD TO 250/3,500 PSI FOR 5110 MIN - OKAY. 04:00 - 04:30 0.50 DRILL P PROD1 LD ANGLE BUILD BHA. 04:30 - 05:00 0.50 DRILL P PROD1 PJSM. REMOVE RA SOURCES FROM DEN/NEU TOOLS. 05:00 - 05:30 0.50 DRILL P PROD1 DOWNLOAD DATA FROM MWD. 05:30 - 06:00 0.50 DRILL P PROD1 C/O PULSER TOOLS. 06:00 - 07:00 1.00 DRILL P PROD1 LD DENINEU TOOLS. CLEAR RIG FLOOR. 07:00 - 07:30 0.50 DRILL P PROD1 PULL WB, SET TEST PLUG. 07:30 - 11 :30 4.00 DRILL P PROD1 TESTED KILL AND CHOKE LINES, HCR VALVES, UlL PIPE RAMS, BLIND RAMS, ANNULAR TO 250/3,500 PSI, FOR 5110 MIN. - OKAY. TESTED FLOOR VALVES, AND TD 250/3,500- OKAY. TESTED ACCUM. SYSTEM - OKAY. Printed: 2/2D/2DD2 11 :29:5D AM ~. /","-, Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 05-02 05-02A REENTER+COMPLETE NABORS NABORS 2ES Start: 1/15/2002 Rig Release: 2/16/2002 Rig Number: Spud Date: 9/8/1974 End: 2/16/2002 2/212002 11 :30 - 12:00 0.50 DRILL P PROD1 PULL TEST PLUG, SET WB. 12:00 -14:00 2.00 DRILL P PROD1 PU HORIZ. DRILLING BHA. CIO ELEVATORS. 14:00 - 14:30 0.50 DRILL P PROD1 RIH TO 413', ST MWD - OKAY. 14:30 -16:00 1.50 DRILL P PROD1 RIH TO 4,331', FILL PIPE AND TEST MWD - OKAY. 16:00 -17:30 1.50 DRILL P PROD1 RIH TO 8,438'. 17:30 - 19:00 1.50 DRILL P PROD1 CUT & SLIP DL, SERVICE TO. 19:00 - 19:30 0.50 DRILL P PROD1 FILL PIPE, TEST MWD. 19:30-21:30 2.00 DRILL P PROD1 RIH TO TD AT 10, 228'. NO PROBLEMS PASSING THRU THE WINDOW. RUN TO BTM W15-10K OF DRAG. REAM LAST STO TO BTM. PU WI NORMAL UP WT OF 190K. 21 :30 - 00:00 2.50 DRILL P PROD1 DRILL TO 10,308'. 2/3/2002 00:00 - 13:30 13.50 DRILL P PROD1 DRILL HORIZONTAL HOLE SECTION TO 10,940' TMD. 13:30 - 14:30 1.00 DRILL N DFAL PROD1 NO RESPONSE FROM MWD TOOL. 14:30 - 15:00 0.50 DRILL N DFAL PROD1 CIRCULATE. 15:00 - 16:30 1.50 DRILL N DFAL PROD1 POOH TO ABOVE WINDOW AT 9,372'. 16:30 -17:00 0.50 DRILL N RREP PROD1 REPAIR BACKUP WRENCH ON TOP DRIVE (BROKEN DIE IN THE GRABBER JAW). 17:00 - 18:00 1.00 DRILL N DFAL PROD1 DROP DART, OPEN CIRC SUB AND CBU AT 9,372'. PUMP SLUG. 18:00 -19:00 1.00 DRILL P PROD1 SERVICE TO, ADJUST SERVICE LOOP, AND SECURE FOR HIGH WIND CONDITIONS. 19:00 - 23:30 4.50 DRILL N DFAL PROD1 POOH TO BHA (PHASE II WEATHER CONDITIONS), 23:30 - 00:00 0.50 DRILL N DFAL PROD1 CIO MWD AND PULSER. CHECK BIT - NO NOTICABLE WEAR OR BROKEN TEETH. 2/4/2002 00:00 - 02:30 2.50 DRILL N DFAL PROD1 CONT. CIO MWD AND PULSER. SURFACE TEST - OKAY. 02:30 - 04:00 1.50 DRILL N WAIT PROD1 ADJUST AND SECURE SERVICE LOOP FOR THE TOP DRIVE, DUE TO HIGH WINDS. 04:00 - 04:30 0.50 DRILL N DFAL PROD1 RIH, SHALLOW TEST MWD. - OKAY. 04:30 - 12:30 8.00 DRILL N DFAL PROD1 CONT. RIH TO ABOVE WINDOW AT 9,380'. SUSPEND DRILLING OPERATIONS DUE TO PHASE III WEATHER CONDITIONS. 12:30 - 00:00 11.50 DRILL N WAIT PROD1 WAIT ON WEATHER, MONITOR WELL AND RIG. 215/2002 00:00 - 10:30 10,50 DRILL N WAIT PROD1 WAIT ON WEATHER, MONITOR WELL. (PHASE III). 10:30 - 12:30 2.00 DRILL N WAIT PROD1 CIRCULATE AND CONDITION MUD AT 7" WINDOW WHILE WAITING ON FRESH WATER FOR RIG. 12:30 - 15:30 3.00 DRILL P PROD1 RIH FROM 9385' TO 10940'. INTERMITTENT TIGHT SPOTS BETWEEN 10000' AND 10500'. WASH AND REAM FROM 10500' TO TO AT 10940. 15:30 - 00:00 8.50 DRILL P PROD1 DIRECTIONAL DRILL FROM 10940' TO 11349'. ROTATE 2.75 HRS SLIDE 3.5 HRS 2/6/2002 00:00 - 14:00 14.00 DRILL P PROD1 DIRECTIONAL DRILL FROM 11349' to 12035'. ROTATE 7.69 HRS SLIDE 0.4 HRS 14:00 - 15:00 1.00 DRILL P PROD1 CIRCULATE OPEN HOLE VOLUME INTO 7" LINER. 15:00 - 16:30 1.50 DRILL P PROD1 POH TO 7" LINER WINDOW AT 9463'. NO HOLE PROBLEMS. 16:30 - 17:30 1.00 DRILL P PROD1 CUT AND SLIP DRILLING LINE. 17:30 - 18:00 0.50 DRILL P PROD1 SERVICE TOP DRIVE 18:00 -19:00 1.00 DRILL P PROD1 RIH TO 12035'. NO HOLE PROBLEMS. 19:00 -19:30 0.50 DRILL P PROD1 SPOT 125 BBL LINER RUNNING PILL IN OPEN HOLE. 19:30 - 21:30 2.00 DRILL P PROD1 POH FROM 12035' TO 9291'. SLM 21 :30 - 23:00 1.50 DRILL P PROD1 DROP DART. OPEN CURCULATING SUB. CURCULATE Printed: 2/20/2002 11:29:50AM ~ ~. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 05-02 05-02A REENTER+COMPLETE NABORS NABORS 2ES Start: 1/15/2002 Rig Release: 2/16/2002 Rig Number: Spud Date: 9/8/1974 End: 2/16/2002 2/612002 21 :30 - 23:00 1.50 DRILL P PROD1 BOTTOMS UP. PUMP DRY JOB. 23:00 - 00:00 1.00 DRILL P PROD1 POH FROM 9291' TO 7520'. SLM 2/7/2002 00:00 - 01 :30 1.50 DRILL P PROD1 POH FROM 7520' TO 3824'. SLM 01 :30 - 04:00 2.50 DRILL P PROD1 POH LAY DOWN 4" DRILL PIPE 04:00 - 04:30 0.50 DRILL P PROD1 LAY DOWN BHA 04:30 - 05:00 0.50 DRILL P PROD1 DOWN LOAD MWD DATA 05:00 - 06:00 1.00 DRILL P PROD1 LAY DOWN BHA 06:00 - 06:30 0.50 DRILL P PROD1 CLEAR RIG FLOOR. RIG DOWN HANDLING EQUIPMENT 06:30 - 08:00 1.50 CASE P COMP RIG UP TO RUN CHROME TUBING. HELD PJSM WITH CREW. 08:00 - 08:30 0.50 CASE P COMP RUN SHOE JOINTS AND CHECK FLOATS. 08:30 - 15:30 7.00 CASE P COMP RUN 90 JTS 41/2" 12.6# 13CR80 VAM ACE LINER 15:30 - 16:30 1.00 CASE P COMP MAKE UP BAKER 7" X 9 5/8" FLEX LOCK HYDRAULIC LINER HANGER 16:30 - 17:30 1.00 CASE P COMP CIRCULATE LINER VOLUME. CHECK PICK UP AND SLACK OFF WEIGHTS. 17:30 - 22:30 5.00 CASE P COMP RIH WITH 4 1/2" LINER ON 4" DRILL PIPE TO 9396'. FILL EVERY 10 STANDS. 22:30 - 23:00 0.50 CASE P COMP MAKE UP CEMENTING HEAD AND LAY DOWN ON SKATE. 23:00 - 00:00 1.00 CASE P CaMP CIRCULATE DRILL PIPE AND LINER VOLUMES AT 9396' 2/8/2002 00:00 - 00:30 0.50 CASE P COMP CIRCULATE DRILL PIPE AND LINER VOLUMES AT 9396' 00:30 - 03:00 2.50 CASE P CaMP RIH WITH 4112" LINER ON 4" DRILL PIPE. WORK PIPE THROUGH TIGHT HOLE FROM 11400' TO 11717' 03:00 - 04:30 1.50 CASE P COMP WASH LINER DOWN THROUGH TIGHT HOLE FROM 11717' TO 12035' 04:30 - 05:00 0.50 CASE P CaMP MAKE UP CEMENT HEAD AND LINES. 05:00 - 08:30 3.50 CASE P CaMP CIRCULATE AND CONDITION MUD WHILE BATCH MIXING CEMENT. TEST LINES TO 4000 PSI. PJSM WITH RIG AND CEMENTING CREWS. 08:30 - 10:30 2.00 CASE P CaMP PUMP 50 BBL WEIGHTED (9.6 PPG) ALPHA SPACER FOLLOWED BY 95 BBL (446 SX) PREMIUM CEMENT AT 15.6 PPG WITH 1% BENTONITE, 2.0 GAUSX LATEX 2000, 0.35%CFR-3, AND 0.1 % HR-5. DISPLACED WITH 65 BBL PERF PILL AND 73 BBL MUD. GOOD INDICATION WHEN LATCHED INTO LINER WIPER. BUMPED PLUG WITH 3500 PSI. 10:30 - 11 :00 0.50 CASE P COMP SET LINER HANGER, RELEASE RUNNING TOOL, PICK UP OUT OF LINER HANGER. SET LINER TOP ZXP PACKER WITH 72,000 LBS DOWN WEIGHT AND REPEAT WITH ROTATION SEVERAL TIMES. GOOD INDICATION OF PACKER SETTING. 11 :00 - 13:30 2.50 CASE P COMP CIRCULATE. 22 BBL CEMENT CONTAMINATED MUD RETURNED. DISPLACE WELL TO 8.4 PPG SEA WATER. 13:30 - 14:00 0.50 CASE P COMP TEST 4112" LINER AND 9 5/8" CASING TO 1000 PSI 14:00 - 14:30 0.50 CASE P COMP RIG DOWN CEMENT HEAD AND LINES. 14:30 - 19:00 4.50 CASE P COMP POH AND LAY DOWN LINER RUNNING TOOL 19:00 - 19:30 0.50 PERF P CaMP PULL WEAR BUSHING AND SET TEST PLUB. 19:30 - 23:30 4.00 PERF P COMP TEST BOP AND RELATED VALVES 250 PSI LOW AND 3500 PSI HIGH. NOTE: TEST WITNESS WAIVED BY CHUCK SCHEEVE 23:30 - 00:00 0.50 PERF P CaMP PULL TEST PLUG AND INSTALL WEAR BUSHING. 2/912002 00:00 - 01 :30 1.50 PERF P CaMP RIG UP TO TEST CASING. TEST 4 1/2" LINER, LINER TOP ZXP PACKER AND 9 518" CASING TO 3500 PSI FOR 30 Printed; 2/2D/2DD2 11;29;50AM ,--..... ,~ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 05-02 05-02A REENTER+COMPLETE NABORS NABORS 2ES Start: 1/15/2002 Rig Release: 2/16/2002 Rig Number: Spud Date: 9/8/1974 End: 2/16/2002 2/912002 00:00 - 01 :30 1.50 PERF P CaMP MINUTES. 01 :30 - 02:00 0.50 PERF P COMP RIG UP 2 112" HANDLING EQUIPMENT FOR PERF GUNS. PJSM WITH RIG CREW AND HALLIBURTON PERF HANDS. 02:00 - 03:30 1.50 PERF P CaMP RIH WITH 930' 2 112" PERF GUNS WITH 320' BLANK SPACERS. 03:30 - 04:00 0.50 PERF P CaMP CHANGE OUT HANDLING EQUIPMENT 04:00 - 07:30 3.50 PERF P CaMP PICK UP 80 JTS 21116" TUBING AND RIH WITH GUNS TO 3737'. 07:30 - 08:00 0.50 PERF P CaMP CHANGE OUT HANDLING EQUIPMENT. 08:00 -12:00 4,00 PERF P CaMP RIH WITH 4" DRILL PIPE WITH TUBING AND GUNS TO 11945' 12:00 - 12:30 0.50 PERF P CaMP POSITION GUNS WITH BOTTOM SHOT AT 11490'. PJSM WITH RIG CREW AND HALLIBURTON PERF HANDS. RIG UP TO PERF. 12:30 - 13:00 0.50 PERF P COMP PRESSURE WELL TO 2200 PSI. GUNS FIRED. BOTTOM SHOT AT 11940' TOP SHOT AT 10690'. 4 SPF. 930' OF PERFS AND 320' OF BLANK SPACERS. LOST 5 BBL WATER TO WELL. 13:00 - 13:30 0.50 PERF P COMP POH TO 11438'. GAS BUBBLES IN DRILL PIPE. MONITOR WELL, STATIC. 13:30 - 15:00 1.50 PERF P COMP REVERSE CIRCULATE 21/2 TIMED DRILL PIPE VOLUME THROUGH CHOKE. 3 BPM AT 650 PSI. 15:00 - 16:30 1.50 PERF P COMP POH FROM 11438' TO 7745' STAND DRILL PIPE IN DERRICK. 16:30 - 17:30 1.00 PERF P COMP SLIP AND CUT DRilLING LINE. 17:30 - 18:00 0.50 PERF P COMP SERVICE TOP DRIVE 18:00 - 19:00 1.00 PERF N RREP COMP REPAIR TOP DRIVE TORQUE BOOST VALVE. 19:00 - 21:30 2.50 PERF P COMP POH TO 3738'. LAY DOWN 4" DRILL PIPE. 21/16" TUBING BROKEN 9 1/2" DOWN FROM BOX ON FIRST JOINT UNDER CROSS OVER. FISH CONSISTS OF 80 JTS 21116" CS HYD TUBING AND 1250' OF 21/2" PERF GUNS AND BLANKS. 21 :30 - 00:00 2.50 PERF N DFAL COMP LOAD PIPE SHED WITH 4" DRILL PIPE AND 4 314" DRILL COLLARS. RIG UP RIG FLOOR. 2/10/2002 00:00 - 02:00 2.00 PERF N DFAL COMP MAKE UP FISHING BHA WITH OVER SHOT DRESSED WITH 2 1/16" GRAPPLE, Mill GUIDE AND 8" GUIDE. 02:00 - 05:00 3.00 PERF N DFAL COMP PICK UP 4" DRill PIPE AND RIH TO 4332'. 05:00 - 07:00 2.00 PERF N DFAL COMP RIH WITH STANDS TO TOP OF FISH AT 7725' 07:00 - 08:30 1.50 PERF N DFAL COMP WORK OVER FISH AND AFTER SEVEAL ATTEMPTS GOOD INDICATION OF ENGAGING SAME DUE TO PRESSURE INCREASE. 08:30 - 12:00 3.50 PERF N DFAL COMP POH WITH FISHING BHA. 12:00 - 13:30 1.50 PERF N DFAL COMP LAY DOWN BUMPER SUB AND OVER SHOT. RECOVERED 11' OF 21116" TUBING. 13:30 - 14:30 1.00 PERF N DFAL COMP MAKE UP FISHING BHA WITH NEW BUMPER SUB AND OVER SHOT WITH 2" GRAPPLE. 14:30 - 17:00 2.50 PERF N DFAl CaMP RUH WITH FISHING BHA TO TOP OF FISH AT 7742' 17:00 -18:30 1.50 PERF N DFAL CaMP WASH OVER FISH AND ENGAGE SAME. JAR ON FISH. PULL FREE. PICK UP WITH 7,000 LBS EXCESS WEIGHT. 18:30 - 19:00 0.50 PERF N DFAL COMP POH TO 6809' 19:00 - 19:30 0,50 PERF N DFAL COMP MONITOR WELL, STATIC. PUMP DRY JOB. BLOW DOWN SURFACE LINES. Printed: 2/2012002 11 :29:50 AM ~. ~ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 05-02 05-02A REENTER+COMPLETE NABORS NABORS 2ES Start: 1/15/2002 Rig Release: 2/16/2002 Rig Number: Spud Date: 9/8/1974 End: 2/16/2002 2/10/2002 19:30 - 22:00 2.50 PERF N DFAL COMP POH WITH FISHING BHA. 22:00 - 23:30 1.50 PERF N DFAL COMP LAY DOWN FISHING BHA AND OVER SHOT. 23:30 - 00:00 0.50 PERF N DFAL COMP RIG UP 21/16" HANDLING EQUIPMENT 2/11/2002 00:00 - 02:00 2.00 PERF N DFAL COMP POH WITH 21/16" TBG FISH. RECOVERED TOTAL OF 40 JTS PLUS PARTED JTS (1269.96'). TOP OF FISH AT 8995'. 02:00 - 05:00 3.00 PERF N DFAL COMP LOAD PIPE SHED WITH 2 3/8" DRILL PIPE AND 3 118" DRILL COLLARS AND STRAP SAME. 05:00 - 07:30 2.50 PERF N DFAL COMP MAKE UP SLIM HOLE FISHING BHA WITH 3 518" OVER SHOT. 07:30 - 10:30 3.00 PERF N DFAL COMP RIH. HOLD UP ON TIGHT SPOT AT 8257'. BOTTOM OF LINER HANGER ASSEMBLY. 10:30 - 11 :00 0.50 PERF N DFAL COMP CIRCULATE AND WORK THROUGH TIGHT SPOT. 11:00-14:00 3.00 PERF N DFAL COMP WORK OVER FISH AT 8995' AND ENGAGE SAME. 14:00 - 14:30 0.50 PERF N DFAL COMP MONITOR WELL, STATIC. 14:30 - 17:30 3.00 PERF N DFAL COMP POH WITH 4" DRILL PIPE TO 847'. 17:30 - 18:00 0,50 PERF N DFAL COMP CHANGE OUT HANDLING EQUIPMENTTO 2 318" 18:00 - 18:30 0.50 PERF N DFAL COMP POH WITH 2 318" DRILL PIPE. 18:30 - 19:00 0.50 PERF N DFAL COMP LAY DOWN 3 118" DRILL COLLARS AND FISHING BHA. 19:00 - 20:30 1.50 PERF N DFAL COMP DISENGAGE FISH AND LAY DOWN OVER SHOT. RECOVER 14" OF 21/16" TUBING. FISH LEFT IN HOLE, 39 JTS 21/16" TBG PLUS -2' STUB AND 1250' OF 21/2" PERF GUNS AND BLANKS. 20:30 - 21 :30 1.00 PERF N DFAL COMP MAKE UP FISHING BHA WITH 2 5/16" GRAPPLE. NO JAR AND NO BUMPER SUB. 21 :30 - 22:30 1.00 PERF N DFAL COMP PICK UP 2 318" DRILL PIPE. RIH WITH 2 318" DRILL PIPE TO 801'. CHANGE HANDLING EQUIPMENT. 22:30 - 23:30 1.00 PERF N DFAL COMP RIH 4" DRILL PIPE WITH FISHING BHA TO 4069'. 23:30 - 00:00 0.50 PERF N DFAL COMP SLIP AND CUT DRILLING LINE. 2/1212002 00:00 - 01 :00 1.00 FISH N DFAL COMP SLIP AND CUT DRILLING LINE, SERVICE TOP DRIVE 01 :00 - 03:00 2.00 FISH N DFAL COMP RIH FI 4069' - 8994' 03:00 - 04:00 1.00 FISH N DFAL COMP WORK OVER AND ATTEMPT TO ENGAGE FISH AT 8994', UP WT 160K, DOWN WT 150K, HAD TO SMALL OVERPULLS OF 2-3K 04:00 - 06:30 2.50 FISH N DFAL COMP POH FI 8994' - 800' 06:30 - 08:00 1.50 FISH N DFAL COMP POH WI FISHING BHA, LD OVERSHOT, NO RECOVERY 08:00 - 11 :00 3.00 FISH N DFAL COMP CLEARED AND CLEANED RIG FLOOR, CHANGED OUT ELEVATORS, LOAD PIPESHED W/3 1/8" DC'S WHILE WAITING ON FISHING TOOLS 11 :00 - 15:00 4.00 FISH N DFAL COMP FISHING TOOLS ARRIVED ON LOCATION, PU TO RIG FLOOR, MEASURED AND STRAPPED FISHING TOOLS, MU MILL ASSY, RIH ON 2 318" DP TO 810', RIG DOWN HANDLING EQUIPMENT 15:00 - 17:30 2,50 FISH N DFAL COMP MU X-O, 7" BOOT BASKET, X-O, RIH WI 4" DP, TAGGED TOP OF FISH AT 8994', EST. PU WT 165K, SIO WT 150K, ROT WT 155K, 3 BPM , 540 PSI 17:30 - 22:30 5.00 FISH N DFAL COMP MILLED 2 1/16" TUBING F/8994' - 8999' AT 3 BPM, 540 PSI, WT ON MILL 1 K, TORQUE 3200 -3800 FTILBS, PUMPED 2 - 25 BBL HI-VIS PILLS 22:30 - 00:00 1.50 FISH N DFAL COMP CIRC 50 BBL HI-VIS SWEEP AROUND, NO CUTTINGS IN RETURNS 2113/2002 00:00 - 01 :00 1.00 FISH N DFAL COMP CIRCULATE SWEEP. MONITOR WELL AND SLUG PIPE. 01 :00 - 05:00 4.00 FISH N DFAL COMP POH WI 4" AND 2-3/8" DRILL PIPE. 05:00 - 06:30 1.50 FISH N DFAL COMP UD BAKER BHA AND CLEAR FLOOR. Printed: 2/20/2002 11 :29:50 AM /~ ~. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 05-02 05-02A REENTER+COMPLETE NABORS NABORS 2ES Start: 1/15/2002 Rig Release: 2/16/2002 Rig Number: Spud Date: 9/8/1974 End: 2/16/2002 2/13/2002 06:30 - 09:00 2.50 FISH N DFAL COMP CIO HYDRAULIC FILTERS AND SERVICED TOP DRIVE WHILE WAIT ON BAKER DRESS OFF GUIDE. 09:00 - 12:00 3.00 FISH N DFAL COMP STRAP AND MIU BAKER OVERSHOT FISHING BHA WI DRESS OFF GUIDE. RIH TO 278'. 12:00 - 15:00 3.00 FISH N DFAL COMP RIH WI 2-318" AND 4" DP. TAGGED FISH @ 8999'. 15:00 - 17:30 2.50 FISH N DFAL COMP WASHOVER FISH WHILE DRESSING TOP. 165K UP, 150K DOWN, 155K ROTARY, TO OFF= 3100 TO ON= 3900 ATTEMPTED TO CATCH FISH, FISH MOVING DOWNHOLE. PUSHED FISH TO 9102'. 4" DRILL PIPE AT TOP OF 4-112" LINER. MONITOR HOLE. 17:30 - 21 :00 3.50 FISH N DFAL COMP POH WI 4" AND 2-3/8" DRILL PIPE. 21 :00 - 22:00 1.00 FISH N DFAL COMP UD FISHING BHA. RECOVERED 1/2 FT 2-1/16" PIPE. BROKE OFF WHEN GRAPPEL WOULDN'T SWALLOW FISH. 22:00 - 23:00 1,00 FISH N DFAL COMP MU FISHING BHA. CHANGED GRAPPEL TO 2-1116". 23:00 - 00:00 1.00 FISH N DFAL COMP PIU AND RIH WI 2-3/8" DRILL PIPE TO 1291'. 2/1412002 00:00 - 02:30 2.50 FISH N DFAL COMP RIH WI FISHING BHA TO TOP OF FISH @ 9102'. UP WT= 160K DOWN WT= 148K 02:30 - 03:00 0.50 FISH N DFAL COMP SLIDE OVER FISH @ 9102', SET DOWN 5K. PULLED 25K STRAIGHT PULL, FISH CAME FREE. 7K OVER STRING WT. 03:00 - 08:00 5.00 FISH N DFAL COMP POH WI 4" AND 2-3/8" DRILL PIPE. 08:00 - 10:00 2.00 FISH N DFAL COMP UD DRILL COLLARS AND FISHING BHA. 10:00 - 12:00 2.00 PERF P COMP UD 38 JTS PLUS 29.55' CUT JT 2-1/16' TUBING. 12:00 - 18:00 6.00 PERF P COMP UD 2-1/2" PERF GUNS. ALL SHOTS FIRED OK. (10,690'-11,480' & 11,700'-11,760' & 11,860'-11,940' @ 4SPF.) CLEAR FLOOR. 18:00 - 18:30 0.50 PERF N DFAL COMP RIH WI 2-318" DRILL PIPE FROM DERRICK. 18:30 - 20:00 1.50 PERF N DFAL COMP UD 2-3/8" DRILL PIPE. 20:00 - 23:30 3.50 PERF N DFAL COMP RIH WI 9-518" CASING SCRAPER ON DRILL PIPE TO 8268'. 23:30 - 00:00 0.50 PERF N DFAL COMP SLIP AND CUT DRILLING LINE. 2/15/2002 00:00 - 00:30 0.50 PERF N DFAL COMP SLIP AND CUT DRILLING LINE. 00:30 - 02:00 1.50 PERF N DFAL COMP PUMP HIGH VIS SWEEP AND DISPLACE WELL TO CLEAN SEA WATER 02:00 - 03:30 1.50 PERF N DFAL COMP POH. STAND 45 STANDS 4" DRILL PIPE IN DERRICK. 03:30 - 06:30 3.00 PERF N DFAL COMP POH. LAY DOWN DRILL PIPE. 06:30 - 07:30 1.00 PERF N DFAL COMP LAY DOWN SCRAPER. CLEAR FLOOR. 07:30 - 08:00 0.50 PERF P COMP PULL WEAR BUSHING. 08:00 - 09:30 1.50 RUNCOtvP COMP RIG UP COMPENSATOR AND TONGS TO RUN 41/2" 13 CHROME TUBING. HOLD PJSM WITH RIG CREW, POWER TONG OPERATOR AND BAKER TECH. 09:30 - 21 :30 12.00 RUNCOtvP COMP RIH WITH 41/2" 12.6# NSCT 13 CR80 COMPLETION. 21 :30 - 22:30 1.00 RUNCOtvP COMP SPACE OUT TUBING WITH PUP JT. TAG UP AT 8240' 22:30 - 00:00 1.50 RUNCOtvP COMP MAKE UP TUBING HANGER AND LAND STRING. WIRE LINE ENTRY GUIDE AT 8238'. RUN IN LOCK DOWN SCREWS. 2/16/2002 00:00 - 01 :00 1.00 RUNCOtvP COMP RUN IN LOCK DOWN SCREWS. 01 :00 - 04:30 3.50 RUNCOtvP COMP REVERSE CIRCULATE AND SPOT 285 BBL SEA WATER TREATED WITH 110 GAL COREXIT CORROSION INHIBITOR. 04:30 - 06:30 2.00 RUNCOtvP COMP DROP 1 7/8" BALL AND ROD. SET S-3 PACKER. TEST TUBING AND ANNULUS TO 3500 PSI FOR 30 MINUTES. BLEED TUBING PRESSURE TO OPEN RP SHEAR VALVE. Printed: 2/20/2002 11 :29:50 AM ~ ,~ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 05-02 05-02A REENTER+COMPLETE NABORS NABORS 2ES Start: 1/15/2002 Rig Release: 2/16/2002 Rig Number: Spud Date: 9/8/1974 End: 2/16/2002 2/16/2002 04:30 - 06:30 2.00 RUNCOrvP COMP 06:30 - 07:30 1.00 RUNCOrvP COMP INSTALL BACK PRESSURE VALVE IN TUBING HANGER AND TEST TO 1000 PSI. 07:30 - 11 :30 4.00 BOPSUR P COMP CHANGE BLIND RAMS TO BLIND SHEAR. 11 :30 - 13:30 2.00 BOPSUR P COMP NIPPLE DOWN BOP. 13:30 - 15:30 2.00 BOPSUR P COMP INSTALL ADAPTOR FLANGE AND TREE. 15:30 - 17:30 2.00 BOPSURP COMP TEST ADAPTOR FLANGE AND TREE TO 5000 PSI. 17:30 - 18:00 0,50 BOPSUR P COMP PULL TREE TEST PLUG WITH DSM LUBRICATOR. 18:00 - 21 :00 3.00 BOPSURP COMP RIG UP HOT OIL UNIT. FREEZE PROTECT WELL WITH 160 BBL DIESEL. ALLOW TO 'U' TUBE 21 :00 - 22:00 1.00 BOPSURP COMP INSTALL BACK PRESSURE VALVE AND TEST TO 1000 PSI. RIG DOWN HOT OIL UNIT. 22:00 - 00:00 2.00 RIGD P COMP RIG DOWN AND PREPARE TO MOVE. RIG RELEASED 24:00 HRS 2/1612002 Printed: 2/2D/2002 11:29:50AM ~ ~ ~-....... -":'~~;;k.. orU 1- oJl.{ I """'~ 13-Feb-O2 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Definitive Re: Distribution of Survey Data for Well 5-02A Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: 9,391.12' MD Window / Kickoff Survey 9,462.00' MD Projected Survey: 12,035.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager RECEIVED FEB 20 2002 Alaska Oil & ==~n Attachment(s) DEFINITIVE ) North Slope Alaska Alaska Drilling & Wells PBU_EOA OS 05, Slot 05-02 05-02 - 5-02A Job No. AKZZ22007, Surveyød: 6 February, 2002 SURVEY REPORT 12 February, 2002 ) Your Ref: 500292014401 Surface Coordinates: 594B806.00 N, 698185.00 E (70° 15' 51.2450" H, 148° 23' 51.2044" W) Surface Coordinates relative to Project H Reference: 948B06.oo H, 198185.00 E (Grid) Surface Coordinates reiatlve to Structure Reference: 1581.63 N, 795.50 E (True) Kelly BushIng: 60. 12ft above Mean Sea Level Sip Ell"""' I"""' Y - Si UI'1 DRILLING 5niiRVH:IiUi A Halllblllton Company Survey Ref: svy11102 Sperry-Sun Drilling Services e Survey Report for 05-D2 - 5-D2A Your Ref: 500292014401 DEFINITIVE Job No. AKZZ22007, Surveyed: 6 February, 2002 Alaska Drilling & Wells North Slope Alaska PBU_EOA DS 05 Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Inct Azlm. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/1ooft) 9391.12 38,000 70,280 8323.98 8384.10 1467.21 N 2552.70 E 5950339.90 N 700698.20 E 2937.50 Tie On Point AK-6 BP _IFR-AK 9462.00 37.650 70.130 8379.97 8440.09 1481.93 N 2593.60 E 5950355.69 N 700738.69 E 0.511 2979.68 Window Point 9497.55 37.480 57,080 8408.19 8468.31 1491.52 N 2612.92 E 5950365.78 N 700757.76 E 22.355 3001.06 ) 9532.00 34.610 42.980 8436.09 8496.21 1504.39 N 2628.42 E 5950379.06 N 700772.91 E 25.430 3021.11 9563.32 33,590 28.880 8462.07 8522.19 1518.51 N 2638.69 E 5950393.44 N 700782.80 E 25.403 3037.49 9589.72 33.440 16,650 8484.10 8544.22 1531.89N 2644.30 E 5950406.96 N 700788.06 E 25.551 3049.60 9607.81 32.550 11.820 8499.28 8559.40 1541.43 N 2646.73 E 5950416.56 N 700790,24 E 15.346 3056.92 9625.96 31.570 6.270 8514.67 8574.79 1550.94 N 2648.25 E 5950426.11 N 700791.51 E 17.100 3063.47 9657.16 31,370 5.010 8541.28 8601.40 1567.14 N 2649.85 E 5950442.35 N 700792.68 E 2.204 3073.81 9685.37 31 .400 8.030 8565.36 8625.48 1581.74 N 2651.52 E 5950456.98 N 700793.96 E 5.576 3083.31 9718.55 35.350 7.270 8593.06 8653.18 1599.82 N 2653.94 E 5950475.13 N 700795.91 E 11.971 3095.39 9750.48 35.370 7.730 8619.10 8679.22 1618.14N 2656.35 E 5950493.50 N 700797.84 E 0.836 3107.58 9779.04 36.700 10.450 8642.20 8702.32 1634.73 N 2659.01 E 5950510.15 N 700800.06 E 7.284 3119.01 9812.12 41.900 14.640 8667.79 8727.91 1655.15N 2663.60 E 5950530.69 N 700804.11 E 17.641 3134.19 9845.59 45.870 13.760 8691.91 8752.03 1677.64 N 2669.29 E 5950553.32 N 700809.20 E 12.000 3151.42 9877.16 52,690 11.020 8712.50 8772.62 1701.00 N 2674.39 E 5950576.81 N 700813.68 E 22.578 3168.65 9908.18 55.010 10.790 8730.79 8790.91 1725,60 N 2679.12 E 5950601 .52 N 700817.77 E 7.503 3186.26 9939.61 60.570 12.570 8747.54 8807.66 1751.62N 2684.52 E 5950627.68 N 700822.48 E 18.327 3205.22 9968.79 65.260 15.390 8760.83 8820.95 1776.82 N 2690,80 E 5950653.03 N 700828.10 E 18.229 3224.46 10001.46 71.070 20.780 8772.98 8833.10 1805.61 N 2700.24 E 5950682.06 N 700836.77 E 23.462 3248.31 10032.35 73.530 23.910 8782.37 8842.49 1832.82 N 2711.43 E 5950709.56 N 700847.24 E 12.513 3272.74 ) 10060.38 76.630 24.990 8789.59 8849.71 1857.48 N 2722.64 E 5950734.50 N 700857.80 E 11.669 3295.77 10092.42 81.860 28.800 8795.57 8855.69 1885.53 N 2736.88 E 5950762.92 N 700871.30 E 20.071 3323.21 10123.15 83.940 31.150 8799.37 8859.49 1911.94 N 2752.11 E 5950789.72 N 700885.83 E 10.168 3350.56 10150.27 83.570 32.160 8802.32 8862.44 1934.89 N 2766.26 E 5950813.03 N 700899.37 E 3.945 3375.08 10160.29 84.750 32.290 8803.34 8863.46 1943.32 N 2771.58 E 5950821.60 N 700904.46 E 11.847 3384.18 10191.49 88.790 34.210 8805.09 8865.21 1969.36 N 2788.65 E 5950848.08 N 700920.85 E 14.332 3412.86 10220.60 86.810 37.100 8806.21 8866.33 1993.00 N 2805.61 E 5950872.15 N 700937.17 E 12.028 3440,09 10253.97 86.400 41.350 8808.19 8868.31 2018.80 N 2826,67 E 5950898.50 N 700957.54 E 12.773 3471.94 10285.38 86.060 45,960 8810.26 8870.38 2041.47 N 2848.30 E 5950921.73 N 700978.57 E 14.685 3502.53 -..'-.-.- 12 February, 2002 - 17:40 Page2of4 DrlllQuest 2.00.09.008 Sperry-Sun Drilling Services I) Survey Report for 05-02 - 5-O2A Your Ref: 500292014401 Job No. AKZZ22007, Surveyed: 6 February, 2002 Alaska Drilling & Wells North Slope Alaska PBU _EOA DS 05 Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0'100ft) 10313.92 86.480 48.310 8812.11 8872.23 2060.84 N 2869.17 E 5950941 .65 N 700998.93 E 8.347 3530.65 10347.78 88.990 51.240 8813.45 8873.57 2082.68 N 2895.00 E 5950964.16 N 701024.17 E 11.389 3564.26 10378.67 87.900 54.980 8814.29 8874.41 2101.21 N 2919.69 E 5950983.34 N 701048.36 E 12.607 3595.09 10407.19 88.440 55.970 8815.20 8875.32 2117.37 N 2943.17 E 5951000.11 N 701071.42 E 3.952 3623.59 ) 10500.08 89.730 58.380 8816.68 8876.80 2167.71 N 3021.21 E 5951052.49 N 701148.10 E 2.942 3716.45 10592.45 90.420 60.880 8816.56 8876.68 2214.41 N 3100.90 E 5951101.26 N 701226.54 E 2.808 3808.64 10641.70 91.580 60.620 8815.70 8875.82 2238.47 N 3143.86 E 5951126.45 N 701268.85 E 2.414 3857.73 10684.73 92.950 60.800 8814.00 8874.12 2259.50 N 3181.36 E 5951148.46 N 701305.78 E 3.211 3900.59 10783.71 92.950 60.840 8808.91 8869.03 2307.70 N 3267.67 E 5951198.91 N 701390.79 E 0.040 3999.12 10874.96 92.640 60.710 8804.46 8864.58 2352.20 N 3347.21 E 5951245.49 N 701469.13 E 0.368 4089.98 10968.58 92.220 60.320 8800.49 8860.61 2398.24 N 3428.63 E 5951293.65 N 701549.31 E 0.612 4183.25 11062.55 91,290 58.900 8797.61 8857.73 2445.75 N 3509.65 E 5951343.28 N 701629,05 E 1.806 4277.00 11155.59 90.920 58.310 8795.82 8855.94 2494.21 N 3589.05 E 5951393.82 N 701707.15 E 0.748 4369.95 11248.95 92.340 59.120 8793.16 8853.28 2542.67 N 3668.80 E 5951444.36 N 701785.60 E 1.751 4463.18 11342.33 92,580 61.560 8789.15 8849.27 2588.83 N 3749.86 E 5951492.64 N 701865.42 E 2.623 4556.22 11435.43 92.210 61.610 8785.26 8845.38 2633.09 N 3831.67 E 5951539.04 N 701946.04 E 0.401 4648.83 11528.61 93.570 62.190 8780.56 8840.68 2676.93 N 3913.76 E 5951585.02 N 702026.94 E 1.586 4741.43 11621.58 92,030 61.310 8776.02 8836.14 2720.88 N 3995.56 E 5951631.11 N 702107.55 E 1.907 4833.85 11714.63 91.600 60.870 8773.08 8833.20 2765.84 N 4076.97 E 5951678.20 N 702187.75 E 0.661 4926.52 11807.69 91.110 61.340 8770,88 8831.00 2810.79 N 4158.42 E 5951725.28 N 702267.99 E 0.730 5019.21 11870.32 92,520 61.610 8768.89 8829.01 2840.69 N 4213.42 E 5951756.61 N 702322.19 E 2.292 5081.55 )' 11902.42 92.650 61.680 8767.44 8827.56 2855.92 N 4241.64 E 5951772.58 N 702350.00 E 0.460 5113.47 11933.79 93,390 62.670 8765.79 8825.91 2870.54 N 4269.35 E 5951787.92 N 702377.30 E 3.937 5144.63 12035.00 93,390 62.670 8759.81 8819.93 2916.92 N 4359.10 E 5951836.65 N 702465.81 E 0.000 5245.02 Projected Survey All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. Magnetic Declination at Surface is 26.5640 (12-Feb-02) The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from Well Reference and calculated along an Azimuth of 56.2110 (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 12035.000., The Bottom Hole Displacement is 5245.02fl., in the Direction of 56.211° (True). -"-----'--- ----'-"- - .. 12 February, 2002- 17:40 Page30f4 DrillOuest 2.00.09.008 North Slope Alaska Comments Measured Depth (ft) 9391.12 9462.00 12035.00 Sperry-Sun Drilling Services Survey Report for 05-02 - 5-O2A Your Ref: 500292014401 Job No. AKZZ22007, Surveyed: 6 February, 2002 e' 1467.21 N 1481.93 N 2916.92 N Survey tool program for 05-02 - 5-D2A Alaska Drilling & Wells PBU_EOA DS 05 Station Coordinates TVD Northlngs Eastlngs (ft) (ft) (ft) 8384.10 8440.09 8819.93 From Measured Vertical Depth Depth (ft) (ft) 0.00 9391.12 0.00 8384.10 12 February, 2002-17:40 To Measured Vertical Depth Depth (ft) (ft) 9391.12 12035.00 8384.10 8819.93 Comment 2552.70 E 2593.60 E 4359.10 E Tie On Point Window Point Projected Survey ) Survey Tool Description MWD Magnetic (5-02A) AK-6 BP _IFR-AK (5-02A) )' Page4of4 DrillQuest 2.00.09.008 /~ ~ AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well 5-02A MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: 9,391.12' MD Window / Kickoff Survey 9,462.00' MD Projected Survey: 12,035.00' MD (if applicable) Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager RECEIVED Attachment(s) FEB 2 0 2002 Alaska Oil & Gas Cons. eo.,~ Anc:tIorage 13-Feb-02 ) North Slope Alaska Alaska Drilling & Wells PBU_EOA OS 05, Slot 05-02 05-02 - 5-02A MWD Job No. AKMW22oo7, Surveyed: 6 February, 2002 SURVEY REPORT 12 February, 2002 ) Your Ref: 500292014401 Surface Coordinates: 5948806.00 N, 698185.00 E (70° 15' 51.2450" N, 148° 23' 51.2044" W) Surface Coordinates relative to Project H Reference: 948806.00 H, 198185.00 E (Grid) Surface Coordinates relative to Structure Reference: 1581.63 N, 795.50 E (True) Kelly Bushing: 60. 12ft above Mean Sea Level sr-u=a."""" y - EiU" DRILLING liifIRVIC&& A Halliburton Company Survey Ref: svylH03 "," .,-:J.'f¡\ I) Spérry-Sun Drilling Services Survey Report for 05-D2 - 5-D2A &fWD Your Ref: 500292014401 Job No. AKMW22oo7, Surveyed: 6 February, 2002 Alaska Drilling & Wells North Slope Alaska PBU_EOA DS 05 Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth (ncl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 9391.12 38.000 70.280 8323.98 8384.10 1467.21 N 2552.70 E 5950339.90 N 700698.20 E 2937.45 Tie On Point 9462.00 37.650 70.130 8379.97 8440.09 1481.93N 2593.60 E 5950355.69 N 700738.69 E 0.511 2979.63 Window Point 9497.55 37.480 70.550 8408.15 8468.27 1489.22 N 2614.01 E 5950363.51 N 700758.90 E 0.865 3000.64 9532.00 34.610 42.980 8436.18 8496.30 1499.94 N 2630.68 E 5950374.67 N 700775.28 E 47.495 3020.46 ) 9563.32 33.590 21.370 8462.22 8522.34 1514.57 N 2639.93 E 5950389.54 N 700784.15 E 38,659 3036.29 9589.72 33.440 16.970 8484.23 8544.35 1528.33 N 2644.72 E 5950403.42 N 700788.57 E 9.219 3047.92 9607.81 32.550 12.160 8499.40 8559.52 1537.86 N 2647.20 E 5950413.01 N 700790.80 E 15.289 3055.28 9625.96 31.570 6.910 8514.79 8574.91 1547.35 N 2648.80 E 5950422.54 N 700792.15 E 16.270 3061.89 9657.16 31.370 5.880 8541.40 8601.52 1563.54 N 2650.61 E 5950438.77 N 700793.54 E 1.839 3072.40 9685.37 31.400 8.600 8565.48 8625.60 1578.11 N 2652.46 E 5950453.38 N 700795.00 E 5.022 3082.05 9718.55 35.350 7.250 8593.19 8653.31 1596.19 N 2654.97 E 5950471.52 N 700797.03 E 12,113 3094,18 9750.48 35,370 7.860 8619.23 8679.35 1614.50 N 2657.40 E 5950489.89 N 700798.98 E 1,107 3106.39 9779.04 36.700 10.420 8642,32 8702.44 1631.09N 2660.07 E 5950506.54 N 700801.22 E 7.034 31 t 7.84 9812.12 41.900 14.890 8667.92 8728.04 1651.50 N 2664.70 E 5950527.07 N 700805.31 E 17.890 3133.05 9845.59 45.870 13.700 8692.04 8752.16 1673.98 N 2670.42 E 5950549.69 N 700810.43 E 12.114 3150.30 9877.16 52.690 12.200 8712.62 8772.74 1697.29 N 2675,77 E 5950573.13 N 700815.16 E 21.900 3167.71 9908.18 55.010 10.990 8730.92 8791.04 1721.82 N 2680.80 E 5950597.79 N 700819.54 E 8.115 3185.54 9939.61 60.570 12.770 8747.67 8807.79 1747.83 N 2686.28 E 5950623.94 N 700824.34 E 18,327 3204.57 9968,79 65.260 16.790 8760.95 8821.07 1772.93 N 2692.92 E 5950649.20 N 700830.32 E 20.214 3224.05 10001.46 71.070 20.720 8773.10 8833.22 1801.62 N 2702.69 E 5950678.14 N 700839.32 E 20.995 3248.13 10033.25 73.530 24.240 8782.77 8842.89 1829.60 N 2714.27 E 5950706.41 N 700850.17 E 13.082 3273.31 ) 10060.38 76.630 26.860 8789.75 8849.87 1853.24 N 2725.58 E 5950730.34 N 700860.85 E 14.752 3295.86 10092.42 81.860 30.620 8795.73 8855.85 1880.82 N 2740.71 E 5950758.31 N 700875.25 E 19.982 3323.78 10123.15 83.940 31.630 8799.53 8859.65 1906.93 N 2756.47 E 5950784.82 N 700890.32 E 7.513 3351.40 10150.27 83.570 31.460 8802.48 8862.60 1929.90 N 2770.58 E 5950808.16 N 700903.82 E 1.500 3375.91 10160.29 84.750 33.730 8803.50 8863.62 1938.30 N 2775.95 E 5950816.69 N 700908.96 E 25.428 3385.04 10191.49 88.790 35.410 8805.26 8865.38 1963.94 N 2793.62 E 5950842.79 N 700925.95 E 14.020 3413.99 10220.60 86.810 37.580 8806.38 8866.50 1987.32 N 2810.92 E 5950866.62 N 700942.63 E 10.087 3441.37 10253.97 86.400 41.280 8808.35 8868.47 2013.05 N 2832.07 E 5950892.90 N 700963.10 E 11.136 3473,26 10285.38 86,060 46.470 8810.42 8870.54 2035.63 N 2853.79 E 5950916.05 N 700984.21 E 16.523 3503.87 .--.,..-.-- ... 12 February, 2002.17:32 Page2of4 DrlllQuest 2.00.09.008 Spérry-Sun Drilling Services 8' Survey Report for 05-02 - 5-D2A MWD Your Ref: 500292014401 Job No. AKMW22oo7, Surveyed: 6 February, 2002 Alaska Drilling & Wells North Slope Alaska PBU--EOA DS 05 Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Elatlngs Rate Section Comment (It) (ft) (It) (ft) (It) (ft) (ft) (0/100ft) 10313.92 86.480 48.670 8812.28 8872.40 2054.85 N 2874.81 E 5950935.81 N 701004.72 E 7.832 3532.03 10347.78 88.990 49.220 8813.62 8873.74 2077.07 N 2900.32 E 5950958.69 N 701029.64 E 7.588 3565.59 10378.67 87.900 56.750 8814.45 8874.57 2095.64 N 2924.95 E 5950977.91 N 701053.78 E 24.622 3596.39 10407.19 88.440 57.380 8815.37 8875.49 2111.14 N 2948.88 E 5950994.03 N 701077.28 E 2.909 3624.90 ) 10500.08 89.730 56.820 8816.85 8876.97 2161.59 N 3026.86 E 5951046,51 N 701153.91 E 1.514 3717.76 10592.45 90.420 61.020 8816.73 8876.85 2209.26 N 3105.95 E 5951096.25 N 701231.72 E 4.608 3810.01 10641.70 91.580 58.870 8815.87 8875.99 2233.92 N 3148.57 E 5951122.O3N 701273.67 E 4.960 3859.14 10684.73 92.950 61.350 8814.17 8874.29 2255.35 N 3185.84 E 5951144.42 N 701310.37 E 6.580 3902.03 10783.71 92.950 59.720 8809.07 8869.19 2303.97 N 3271.90 E 5951195.29N 701395.12 E 1.645 4000.59 10874.96 92.640 61.160 8804.62 8864.74 2348.93 N 3351.18 E 5951242.33 N 701473.19 E 1.612 4091.48 10968.58 92.220 60.600 8800.65 8860.77 2394.45 N 3432.89 E 5951289,98 N 701553.67 E 0.747 4184.70 11062.55 91.290 59.840 8797.78 8857.90 2441.10 N 3514.41 E 5951338.76 N 701633.94 E 1.278 4278.40 11155,59 90.920 57.350 8795.98 8856.10 2489.57 N 3593.80 E 5951389.30 N 701712.02 E 2.705 4371.33 11248.95 92.340 58,460 8793.33 8853.45 2539.15 N 3672.86 E 5951440.95 N 701789.75 E 1.930 4464.61 11342.33 92.580 59.970 8789.32 8849.44 2586.90 N 3753.00 E 5951490.79 N 701868.61 E 1.636 4557.77 11435.43 92.210 60.660 8785.43 8845.55 2632.96 N 3833.81 E 5951538.97 N 701948.18 E 0.840 4650.55 11528.61 93.570 60.550 8780.73 8840.85 2678.64 N 3914.89 E 5951586.76 N 702028.02 E 1.464 4743.33 11621.58 92.030 61.820 8776.19 8836.31 2723.39 N 3996.25 E 5951633.64 N 702108.18 E 2.146 4835.83 11714.63 91.600 61.070 8773.24 8833.36 2767.85 N 4077.94 E 5951680.23 N 702188.67 E 0.929 4928.45 11807.69 91,110 61.590 8771.04 8831.16 2812.48 N 4159.57 E 5951727.00 N 702269.09 E 0.768 5021.11 11870.32 92.520 60.120 8769.06 8829.18 2842.97 N 4214.24 E 5951758.91 N 702322.94 E 3.251 5083.50 ) 11902.42 92.650 61.820 8767.61 8827.73 2858.53 N 4242.27 E 5951775.20 N 702350.56 E 5.306 5115.45 11933.79 93.390 63.110 8765.96 8826.08 2873.01 N 4270.05 E 5951790.41 N 702377.94 E 4.736 5146.59 12035.00 93.390 62.670 8759.97 8820.09 2919.05 N 4359.98 E 5951838.80 N 702466.63 E 0.434 5246.93 Projected Survey All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. Magnetic Declination at Surface is 26.564° (12-Feb-02) The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from Well Reference and calculated along an Azimuth of 56.197° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 12035.00ft., The Bottom Hole Displacement is 5246.93ft., in the Direction of 56.197° (True). . ...-----.------------- .....-- --- --.n 12 February, 2002 - 17:32 Page30f4 Dril/Quest 2.00.09.008 North Slope Alaska Comments Measured Depth (ft) 9391.12 9462.00 12035.00 "jI(':' .~::ï:il!", ~ Spérry-Sun Drilling Services" .~; Survey Report for 05-02 . 5-O2A MWO Your Ref: 500292014401 Job No. AKMW22oo7, Surveyed: 6 February, 2002 - 1467.21 N 1481.93N 2919.05 N Survey tool program for OS.()2. 5'()2A MWD From Measured Vertical Depth Depth (ft) (ft) 0.00 12 February. 2002.17:32 Alaska Drilling & Wells PBU ,EOA DS 05 Station Coordinates TVD Northlngs Eastlngs (ft) (ft) (ft) 8384.10 8440.09 8820.09 0.00 To Measured Vertical Depth Depth (ft) (ft) 12035.00 8820.09 Comment 2552.70 E 2593.60 E 4359.98 E Tie On Point Window Point Projected Survey Survey Tool Description MWD Magnetic (5-02A MWD) Psge4of4 OrlllOuest 2.00.09.008 ) ) ,~ ,........, ~~~~E (ill} ~~~~'~~~ / ALAS IiA 0 IL AND GAS / CONSERVATION COMMISSION TONY KNOWLES, GOVERNOR 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907)27&7542 Brian Robertson Senior Drilling Engineer' BP Exploration (Alaska) Inc. PO Box 196612 Anchorage AK 99519 Re: Prudhoe Bay Unit 05-02A BP Exploration (Alaska) Inc. Permit No: 201-241 Sur Loc: 2614' NSL, 1109' EWL, Sec. 32, T11N, RISE, UM Btmhole Loc. 250' NSL, 132' EWL, Sec. 28, TIIN, RISE, UM Dear Mr. Robertson: Enclosed is the approved application for permit to redrill the above referenced well. The permit to redrill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Annular disposal has not been requested as part of the Permit to Drill application for Prudhoe Bay Unit 05-02A. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, ~ .~£~ c~echsli Taylor Chair BY ORDER OF THE COMMISSION DATED this 21th day of December, 2001 jjc/Enc1osures cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Hole 6" JM.W W4A- J2..111 (01 ~ STATE OF ALASKA ,-. 1~')J)Dl ALASKA. AND GAS CONSERVATION COMM. :ION J \;)./ # \ PERMIT TO DRILL 20 AAC 25.005 11 b. Type of well 0 Exploratory 0 s(ratigraphic Test 181 Development Oil 0 Service 0 Development Gas [g'Single zone)'; 0 Multiple Zone 5. Datum Elevation (DF or KB) 10. Field and Pool Plan RKB = 64' Prudhoe Bay Field / Prudhoe 6. Property Designation Bay Pool 02$3zt kADL 028325AV 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number 05-02A 9. Approximate spud date 01/07/02 Amount $200,000.00 14. Number of acres in property 15. Proposed depth (MD and TVD) 2560 11963' MD / 8834' TVD 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} 0 93 Maximum surface 2470 psig, At total depth (TVD) 8800' / 3350 psig Setting Depth Too Bottom Lenath MD TVD MD TVD 3688' 8275' 7926' 11963' 8834' 11. Type Bond (See 20 AAC 25.025) 1a. Type of work 0 Drill II Redrill 0 Re-Entry 0 Deepen 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2614' NSL, 1109' EWL, SEC. 32, T11 N, R15E, UM At top of productive interval 4505' NSL, 3901' EWL, SEC. 32, T11 N, R15E, UM At total depth 250' NSL, 132' EWL, SEC. 28, T11 N, R15E, UM 12. Distance to nearest property line 113. Distance to nearest well ADL 028326, 132' MD No Close Approach 16. To be completed for deviated wells Kick Off Depth 9450' MD Maximum Hole Angle 18. Casinp Program Specifications Size Casino Weicht Grade Couolina 4-1/2" 12.6# 13Cr80 Vam-Ace Number 2S 100302630-277 Quantitv of Cement (include staae data) 406 sx Class 'G' ~t:C~IVFn 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical DEC 1 4 2001 Casing Structural Conductor Surface Intermediate Production Liner 10200 feet 9035 feet 10108 feet 8960 feet Length Size Plugs (measured) Junk (measured) Alaska Oil & Gas Cons. COmmiSSiOn Anctlofage Cemented MD TVD 114' 114' 2712' 2711' 8866' 7982' 8538' - 10194' 7739' - 9031' 114' 20" 2712' 13-3/8" 8866' 9-5/8" 1656' 7" 502 sx Permafrost 5463 sx Permafrost II 1200 sx Class 'G', 125 sx PF II 410 sx Class 'G' 20. Attachments Open: 9940' - 9950', 9969' - 10002' Squeezed: 9906' - 9923', 9926' - 9940' true vertical Open: 8831'.8840', 8855' - 8882' Squeezed: 8804'- 8818', 8820' - 8831' 181 Filing Fee 0 Property Plat 0 BOP Sketch 181 Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis Contact Engineer Name/Number: Dave Wesley, 564-5773 0 Diverter Sketch 181 Drilling Program 0 Seabed Report 0 20 AAC 25.050 Requirements Prepared By Name/Number: Terrie Hubble, 564-4628 Perforation depth: measured 21. I hereby certify that the to the best of my knowledge Title Senior Drilling Engineer Date Approved By Form 10-401 Rev. 12-01-85 Permit Number / /,/' I API Number ;ZO/-- 2'-1" J 50- 029-20144-01 Conditions of Approval: Samples Required 0 Yes Œr No Hydrogen Sulfide Measures I»Yes 0 No Required Working Pressure for BOPE 0 2K 0 3K Other: Test f;ofE to '5500 ps~~~ Original Signed By C. . Cammy 08chsll ommlSSloner nR\G\NAL A~W]Val Dffle. I See cover letter \2\ '8\ \ Iv , for other requirements Mud Log Re uired 0 Yes tg No Directional Survey Required ~Yes 0 No 04K 05K 010K 015K 03.5KpsiforCTU by order of the commission Date t~ .~ I JO I Subm tin Vr:Plicate f""" .-., I Well Name: I DS5-02A Drill and Complete Plan Summary I Type of Well (service I producer I injector): I Sidetrack Horizontal Producer I AFE Number: 14J0497 I Estimated Start Date: 101/07/02 Surface Location: Estimated Target Location: Sadlerochit Zone 1 A Bottom Hole Location: I MD: 111,963' I x = 698,185.00 2614' FSL, 1109' FWL X = 700,919.80 4505' FSL, 3901' FWL X = 702,399.68 250' FSL, 132' FWL Y = 5,948,806.00 Sec. 32, T11 N, R15E Umiat Y = 5,950,770.30 TVDss 8795 Sec. 32, T11N, R15E Umiat Y = 5,951,835.45 TVDss 8770 Sec. 28, T11N, R15E Umiat I Rig: I Nabors 2ES 1 1 I Operating days to complete: 118.75 I BF/MS: 135.0' 1 I AKB: 164.0' I TVD: 18834' I Well Design (conventional, slim hole, etc.): I Horizontal Sidetrack I Objective: I Zone 1 A, Sadlerochit CasinglTubing Program Hole Size Csg/ WtlFt Grade Conn Length Top Btm Tbg O.D. MD/TVD MD/TVD 6" 4 Y2" 12.6# 13Cr-80 Vam-Ace -3688' 8275' / 7926' 11963' / 8834' Tubing 4 Y2" 12.6# 13Cr-80 Vam-Ace -8275' GL 8275'/7528' Directional KOP: I 9,450' MD Maximum Hole Angle: Close Approach Well: Survey Program: DS5-02A Sidetrack -430 in original well bore at -8600' MD -93.110 through reservoir section of planned sidetrack from 11,086' md to 11,322' md. There are no close approach issues of concern: The closest well to the 05- 02A is DS11-38 with a center-center distance of 843' and allowable deviation of 158' at the planned depth of 11,945'. This well passes major risk criteria and will not be shut in while drilling. Standard MWD Surveys from kick-off to TD. Page 1 r-" ~ Mud Program Window Mllllì Mud Properties: Ouickdril-N I Whipstock Window 7" I Density (ppg) Viscosity I PV I YP I tauO MBT pH I APIFI I 8.4 - 8.6 50 - 70 5 - 6 30 - 35 5-8 <3 9.0 N/C Production Mud Properties: Quickdril-N I 6" hole section I Density (ppg) I Viscosity I PV YP I tauO MBT I pH I APIFI I 8.4- 8.6 45-55 5-8 20 - 25 5-8 <3 8.5 - 9.0 N/C Logging Program 6" Production: Sample Catchers - None Drilling: MWD Dir/GRlRes/DenlNeu - Real time GR/RES throughout entire interval; Recorded DEN/NEU in build section only. Open Hole: None Cased Hole: Cement Program I Casing Size 14 1/2" Production Liner Basis: lead: None Tail: Based on 80' of 4-1/2" shoe track, 2513' of 6" open hole with 30% excess, 912' of 4 W' x 7" liner lap, 263' of 4 W' x 9 5/8" liner lap, and 200' of 9 5/8" x 4" DP annulus volume. Tail TOC: -8275' /' MD (7528'TVD).- Liner top. I Fluid Sequence & Volumes: Pre 5 Bbls Water Flush Spacer Lead Tail 40 bbls Alpha Spacer at 9.8 ppg None 86 bbl I 483 fe I 406 sks of Halliburton 'G' at 15.6 ppg and 1.19 cf/sk, BHST 1950 TT = Batch Mix + 4 to 4.5 hrs Well Control Well control equipment consisting of 5000 psi working pressure pipe rams (2), blindlshear rams, and an annular preventer will be installed and is capable of handling maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3500 psi. BOPE and drilling fluid system schematics are currently on file with the AOGCC. Production Section- . Maximum anticipated BHP: 3350 psi @ 8800' TVDss - Ivishak . Maximum surface pressure: 2470 psi @ surface (based upon BHP and a full column of gas from TD @ 0.10 psi/ft) . Planned BOP test pressure: Planned completion fluid: 3500 psi 8.6 ppg seawater / 7.2 ppg Diesel . DS5-02A Sidetrack Page 2 ,,--... .~ . No annular injection in this well. Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at OS-04. Any metal cuttings will be sent to the North Slope Borough. Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to OS-04 for injection. Haul all Class I wastes to Pad 3 for disposal. . . Formation Markers Formation Tops (Wp#3) MD TVDss Comments LCU 8229 KINGAK Above Casing Window T JFfTOP KINGAK F TJDfTOP KINGAK D T JAfTOP KINGAK A KO ZONE: SAG RIVER SS 8261 WD-TSHU/SHUBLIK 8298 WD-TEIL WD-TSADfTZ4B 8356 WD-TCGL 9615 8502 WD_BCGL 9670 8547 TZ2B 9729 8596 WD-23SB 9751 8614 WD-22TS 9801 8655 WD-TZ1B 9924 8740 TARGET ZONE: WD-TZ1A 9936 8746 BSAD 8817 Not penetrated TD Criteria: Target polygon DS5-02A Sidetrack Page 3 r-c, -- Sidetrack and Complete Procedure Summary RiCl Operations: 1. MIRU Nabors 2ES. 2. Pull BPV. Circulate out freeze protection and displace well to seawater. Set TWC. 3. Nipple down tree. Nipple up and test BOPE. Pull TWC. 4. Pull seal assembly from PBR above upper production packer at 8508' MD (NOTE: Tubing hanger will need to be speared due to two piece K-Monel design). POOH laying down 4W' completion. 5. Make-up spear. RIH and engage ID of PBR above Baker 'HB' retrievable packer. Jar packer free and POOH with packer and all completion equipment down to 3W' tubing cut at 9550'. 6. RU E-line and make GR/JB run to top of tubing cut. MU bridge plug. RIH and set at 9468'. 7. Test wellbore to 3000 psi for 30 minutes (NOTE: 9-5/8" casing had a pre-existing leak at -8350' MD. It has been squeezed, but when tested on 2/14/01 had a leak rate of -0.3 bpm at 3000 psi). 8. RIH with 7" Baker whipstock assembly. Orient whipstock as desired and set on bridge plug. Mill window in 7" casing at 9450' MD. POOH. 9. MU 6" directional assembly with MWD/GR/RES/NEU/DEN and RIH. Kick-off and drill the 6" production interval, building at -17°/100' to horizontal, targeting the Zone 1 sands. Drill ahead to an estimated total depth of 11,963' MD (8834' TVD). 10. Run and cement a 4W', 12.6# 13Cr-80 solid production liner throughout the 6" wellbore and back into the 9-5/8" casing to the liner top at -8,275' (to cover pre-existing leak at -8350' MD). Displace well to clean seawater above the liner top and POOH. 11. Test the 4W' and 9-5/8" casing from the 4W' landing collar to surface to 3500 psi for 30 minutes. 12. PU Halliburton 2W' perf guns and RIH on DP. Perforate -1000' of Zone 1 in the horizontal section. POOH LD DP. 13. Run 4W', 12.6# 13Cr-80 completion tying into the 4W' liner top. 14. Set packer and test the tubing to 3500 psi and annulus to 3500 psi for 30 minutes. 15. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. 16. Freeze protect the well to -2200' and secure the well. 17. Rig down and move off. Post-RiCl Work: 1. MIRU slickline. Pull the ball and rod 1 RHC plug from 'X' nipple below the production packer and install gas lift valves. Estimated Start Date: January 7,2002 DS5-02A Sidetrack Page 4 ,r- ,-... "~~,~~~"~,...,. ~,.> Job 1: MIRU Hazards and Contingencies >- No wells will require shut-in for the rig move to DS5-02. 05-32 is 120' to the North, and 05-18 is 120' to the South. These are the two closest neighboring wells. >- OS 05 is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should be followed at all times. Recent H2S data from the pad is as follows: Adjacent producers at Surface: 5-18A No recorded H2S 5-32 No recorded H2S Closest BHL Wells 5-32 No recorded H2S 11-38 < 10ppm H2S (11/2000) The maximum level recorded of H2S on the pad was 27 ppm. ~ Post Permit to Drill and Summary of Drilling Hazards in the dog house and camp prior to spud Job 2: De-complete Well Hazards and Contingencies >- The perforated intervals and lower section of this well should be isolated by 2 barriers (the cement plug and the seawater). The plug will be tested in the pre-rig operations. Monitor the well to ensure the fluid column is static, prior to pulling the completion. >- NORM test all retrieved well head and completion equipment. -~ -...----" - -,--..,---~ Job 3: Run Whipstock Hazards and Contingencies >- Once milling is complete, make sure all BOP equipment is operable. Wash out BOP stack to remove any metal cuttings, which may have settled there. Job 7: Drill 6" Production Hole Hazards and Contingencies >- The southern polygon border is a hard line due to the proximity with well 11-38A. >- There are no anticipated fault crossings while drilling 05-02A. ~ Stuck pipe and lost circulation has been an issue on the more recent DS5 wells, predominantly CTU sidetracks. Review the pad data sheet for details. Though most of these incidents occurred in Zone 2, or above, Zone 1 is not immune to these problems. """="=",,=,-,,,.,,. ,.." Job 9: Install 4~" Production Liner Hazards and Contingencies >- Differential sticking could be a problem. The 8.5 ppg Quickdril will be -600 psi over balanced to the Ivishak formation. Minimize the time the pipe is left stationary while running the liner. >- Ensure the liner top packer is set prior to POOH. Slack off with rotation to the maximum allowable down weight, as per Baker representative. ~~-. ,.. ,,------..-. DS5-02A Sidetrack Page 5 ,.-.. ,-.. Job 10: OPC Perforate Hazards and Contingencies >- The well will be perforated overbalanced after running 4 W' liner. Ensure all personnel are well briefed on Halliburton's perforating procedures and that all responsibilities are understood. Only essential personnel should be present on the rig floor while making up DPC guns. >- Expect to lose fluid to the formation after perforating. Have ample sea water on location and be prepared with LCM if necessary. ,~~~ Job 12: Run Completion Hazards and Contingencies >- Diesel will be used to freeze protect the well. The diesel flash point is 1000 F. Diesel vapor pressure is - 0.1 psia at 1000 F. -~""""m , '^-="'~"=~ =T""Lg~ Job 13: NO/NU/Release RiCi Hazards and Contingencies >- Though there are no close proximity surface issues, identify all potential hazards in a pre rig move meeting, and take every precaution to ensure good communication prior to beginning the rig move. Use spotters when moving the rig about he pad and while positioning on the hole. " " "----, DS5-02A Sidetrack Page 6 .r"- ..-"\.. OST THIS NOTICE IN THE DOGHOUSh 5-02A Rig site Summary of Drilling Hazards ./ Standard Operating Procedures for H2S precautions should be followed at all times. Very little recent data on H28 on 08-5 exists. The highest concentration currently on record is on 085-05 @ 27 ppm, (November 1990). ./ NORM test all retrieved well head and completion equipment. ./ All wells pass major risk criteria. The closest approach D811-38A with a center- center distance of 843' and allowable deviation of 158' at the planned depth of 11,945'. This well passes major risk criteria and will not be shut in while drilling. ./ Lost circulation may also be experienced while drilling. Though not expected to be a problem, potential lost circulation demands awareness. The 880 lost circulation tree should be followed if lost fluid returns are encountered. ./ Differential sticking may be encountered in this depleted reservoir. Overbalance is approximately 600 psi. Always follow established drilling and connection practices for stuck pipe prevention. ./ A PJ8M will be conducted prior to the DPC perforating operation. All personnel should clearly understand their responsibilities, and only essential personnel should be present on the rig floor during makeup and retrieval. ./ Diesel will be used to freeze protect the well. The diesel flash point is 1000 F. Diesel vapor pressure is - 0.1 psia at 1000 F. CONSULT THE DS 5 PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. DS5-02A 'ë ~ 8100- e e :;, "' ¡¡. 0 ¡j 1: ~ 2 f- 8400 All TVD depths are ssTVD plus 64' for RKBE. COMPANY DETAII$ REFERENCE INFORMA noN ""V~:.r~I~:::~= 't:.~I\~5;\§I';',?~I~;;:!;';::h S""'..(VSJ""r,."""", SI". 02 (O.OON,O.OOE) M~'~~,;r,~,~'~= :':;;'i~~'~!:..:n':~1 M.OO nPAm'~' C,I"I"i,.. ""lxd, Minimwn Cù~",", ~;:,~ik:~ ~",;V";":~~""'N"nh Em"S~r'œ' Ellipt"'I+Cuing W,m"., ""h,d, Rnk' n"", 7200- FORMATION TOP DETAILS No, TVDPalh MDPath Formation I 8293.00 9273,88 LCU 2 8324.98 9314.80 Sag Rjver 3 8362.00 9361.99 WD-TSHU/Shublik 4 8420.00 9435,59 WD-TSADrrZ48 5 8566.00 9615.07 WD-TCGL 6 8611.00 9669.61 WD-BCGL 7 8660.00 9729.06 TZ2B 8 8678.00 9750.89 WD-23SB 9 8719.00 9800,69 WD-22TS 10 8804.00 9924,39 WD-TZI8 II 8810.00 9935.64 WD.TZIA 7500- 7800- l ,I ,I .I ;I ,I I ,I I l l End Dir : 9634.11' MD, 8581.74' TVD 8700 9000 SURVEY PROGRAM o..~IhFm 1"~Ih1<. Sn""Yn'bn Plan: OS.o2. wpO3 (OS.oWlan OS.o2A) T...I C""od By: KL... Allen Checkod: Dale: 8/2712001 9<S0.OO 11%2.(,5 """""",OS.o"'"",O1VI MWD Dale:- Dale:- Reviewed: WEU,DETAILS N""" 'N/,' IA..g"""" 81", "'.W 797., E..,¡ng 698185.00 ,~""'" """"ng 594_.00 OS.()2 1581.02 70'15"'245N 14II"21'Sl204W 02 TARGET DETAILS """' lVJ) +NI.S +EI.W Nnrthing """" Sh"", OS"""" "(~.OO 2453.47 3490.71 59S1JSO.37 701609.73 Puinl 05.o",G "49.00 2606.61 3754.83 5951"°.39 701869.71 Puinl OS.o",.. 8834.00 2917.62 429320 59518J5.45 702399.68 Puinl OS,()"'II, "59.00 1891.73 2785.71 595077029 700919.79 Pninl OS.()"'II "59.00 1995.12 2848.44 S95OS75.JO 700979.78 Puinl SECTION DETAILS See MD Inc Azi TVD +N/-S +E/-W DLeg TFace VSec Targel I 9450.00 37,81 69,20 8431.38 1478.95 2584,37 0.00 0.00 2968.78 ) 2 9470.00 38,08 65,32 8447,15 1483,70 2595,70 12.00 -85.00 2980.82 3 9634,1 I 34.49 20.57 8581.74 1549.48 2659,13 16.00 -115.71 3070.25 4 9793,11 34.49 20.57 8712.80 1633,77 2690,76 0.00 0.00 3143.79 5 10116,74 89,50 20.00 8859,00 1891.73 2785.71 17.00 -0.70 3367.32 05-02a Ila 6 10431.64 89,73 57.79 8861.21 2132.39 2979,86 12.00 89.80 3663.16 7 10999.71 89,73 57,79 8863.92 2435,20 3460.49 0,00 0.00 4230.89 8 11035,03 90,00 59,89 8864.00 2453.47 3490.71 6.00 82.59 4266.15 05-02a t2 9 11086.87 93. I I 59.89 8862.59 2479.46 3535,53 6.00 0,04 4317.83 10 11322.15 93,11 59.89 8849,83 2597.31 3738,77 0.00 0.00 4552.17 II 11340.73 92.00 59,99 8849,00 2606.61 3754,83 6.00 174.96 4570.68 05-02a t3 12 11351.11 91.38 59.99 8848.69 2611.80 3763,82 6,00 -179.57 4581.03 13 11962.65 91.38 59.99 8834.00 2917,62 4293.20 0,00 0.00 5190.77 05-02a t4 CASING DETAILS No. TVD 8834.00 MD Name Size 11962.64 41/2" 4.500 ) 4 : 11962.65' MD, 8834' TVD I 3000 3600 I 3900 I 4200 4500 Vertical Section at 55.80° [3001\/in] I 5700 I 4800 I I 5100 I 5400 COMI'ANV DETAILS REFERENCE INFORMATION C<Mmli""'(N1E) Ror,~..."" W,IIc..~lre' °"'2, T""N"rth V,""I(1VD)Ror~, ",cn'"2I"17<XH)(J(~.OO S",'ion(VS)Ror're~' SI,'. 02 (O.OON,O.OOE) M,ti~~~~~J:: lJi;i~~lð;:;;¡,C:¡OO 64.00 "l'Am"'" C.I""'ti,~ M,"""', Mm"""" em.... ~.r..~::¡: \';';vW¿;;_N""h Eo..",r..", Ellipl;",1 + a.... W,m'" M"""", Rul"""",, ;' I I I ;' I .I I .I I l 3000 SURVEY PROGRAM Plan: 05-O2a wpO3 (0'-O2!P\an 05-O2A) IkplhFm I>.'pIhTn """,yiP". 9480.00 11962.M P""""",0'..2o.,.o1V1 T...\ Crealed By: Ken Allen Checked: Dole:- Date:- Dale: &1271200\ MWD Reviewed: WELL DETAILS N~ +N/,< um,- 'In! +E/.W """"'" ""'06.00 """'" """,00 ...m"", °"'2 "'1.02 ",., 10"""24SN 148.,3"'204W 02 TARGET DETAILS N~ 1VD +N/.S +E/.W "',rthi., """ Shore O""," 88M.OO 2453.41 3490.71 '9""°.31 101609.73 !'oint O,-<>"" 8849.00 2"06.61 3784.83 '9'1"°.39 10,"69.71 Pmnl °'-<>"'4 "34.00 2917.62 429320 '9'1838.4' 102399.68 Poi.. O'-<>"". "'9.00 "91.73 27".71 '9'071029 100919.79 P"iol SECTION DETA[LS See MD [ne Azi TVD +N/-S +E/-W DLeg TFaee VSec Target I 9450.00 37.8[ 69.20 8431.38 1478.95 2584.37 0.00 0.00 2968.77 ì 2 9470.00 38.08 65.32 8447.15 1483.70 2595.70 12.00 -85.00 2980,82 3 9634.1 [ 34.49 20.57 8581.74 1549.48 2659.13 16.00 -I [5,71 3070,26 4 9793.1 [ 34.49 20.57 8712.80 1633.77 2690,76 0.00 0.00 3143.80 5 [01 [6.74 89,50 20,00 8859.00 1891.73 2785.7[ 17,00 -0.70 3367.31 05-02a II a 6 10431.64 89.73 57.79 8861.21 2132.39 2979.86 [2,00 89.80 3663.17 7 10999.71 89.73 57.79 8863.92 2435.20 3460.49 0.00 0.00 4230.89 8 11035.03 90,00 59.89 8864.00 2453.47 3490.71 6.00 82.59 4266.15 05-02a 12 9 [1086,87 93,11 59.89 8862.59 2479.46 3535.53 6,00 0.04 4317.83 10 11322,15 93,11 59.89 8849.83 2597.31 3738,77 0,00 0.00 4552.17 II 11340,73 92,00 59.99 8849.00 2606.61 3754.83 6.00 174.96 4570,68 05-02a t3 12 11351.11 91.38 59.99 8848.69 26[ 1.80 3763.82 6,00 -179.57 4581.03 13 11962,65 91.38 59,99 8834.00 29[ 7,62 4293.20 0,00 0.00 5190.77 05-02a t4 CASING DETAILS All TVD depths are ssTVD plus 64' for RKBE. No. TVD MD Name Size 8834.00 11962,644[/2" 4.500 FORMATION TOP DETAILS No. TVDPath MDPalh Fonnalion t 8293,00 9273,88 LCU 2 8324.98 9314.80 Sag River 3 8362.00 9361.99 WD- TSHU/Shublik 4 8420,00 9435.59 WD-TSADrrZ4B 5 8566,00 9615.07 WD-TCGL ) 6 8611.00 9669.6\ WD-BCGL 7 8660,00 9729.06 TZ2B 8 8678,00 9750.89 WD-23SB 9 8719.00 9800,69 WD-22TS I 10 8804.00 9924,39 WD-TZIB II 8810,00 9935,64 WD-TZIA Depth: It 962,65' MD, 8834' TVD :? 2500 ;¡: 0 Ë +' :E 1: ~ :E ':5 ~ 2000 2500 I 4500 3500 3000 4000 Wesl(-)/East(+) [500ft/in] I 5000 I 5500 .~ ~ BP Amoco Planning Report - Geographic Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Goo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Field: Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre BGGM2001 PB DS 05 TR-11-15 UNITED STATES: North Slope Site Position: Northing: FrDm: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft Site: 5947204.70 ft 697428.91 ft Latitude: 70 15 35.696 N Longitude: 148 24 14.424 W North Reference: True Grid Convergence: 1.50 deg Well: 05-02 Slot Name: 02 05-02 Surface Position: +N/-S 1581.02 ft Northing: 5948806.00 ft Latitude: 70 15 51.245 N +E/-W 797.85 ft Easting: 698185.00 ft Longitude: 148 23 51.204 W Position Uncertainty: 0.00 ft Reference Point: +NI-S 1581.02 ft Northing: 5948806.00 ft Latitude: 70 15 51.245 N +EI-W 797.85 ft Easting: 698185.00 ft Longitude: 148 23 51.204 W Measured Depth: 30.00 ft Inclination: 0.00 deg Vertical Depth: 30.00 ft Azimuth: 0.00 deg Wellpath: Plan 05-02A Drilled From: 05-02 I Tie-on Depth: 9450.00 ft I í Current Datum: 16: 07 5/12/1977 00:00 Height 64.00 ft Above System Datum: Mean Sea level ! Magnetic Data: 81212001 Declination: 26.74 deg I Field Strength: 57507 nT Mag Dip Angle: 80.80 deg Vertical Section: Depth From (TVD) +NI-S +EI-W Direction ft ft ft deg 0.00 0.00 0.00 55.80 Plan: 05-02a wp03 Date Composed: 8/27/2001 ì Version: 1 I Principal: Yes Tied-to: From: Definitive Path Plan Section Information Oft 9450.00 37.81 69.20 8431.38 1478.95 2584.37 0.00 0.00 0.00 0.00 9470.00 38.08 65.32 8447.15 1483.70 2595.71 12.00 1.37 -19.39 -85.00 9634.11 34.48 20.57 8581.74 1549.49 2659.14 16.00 -2.19 -27.27 -115.71 9793.11 34.48 20.57 8712.80 1633.77 2690.76 0.00 0.00 0.00 0.00 10116.74 89.50 20.00 8859.00 1891.73 2785.71 17.00 17.00 -0.18 -0.70 05-02a t1a 10431,64 89.73 57.79 8861.21 2132.39 2979.86 12.00 0.07 12.00 89.80 10999.71 89.73 57.79 8863.92 2435.20 3460.49 0.00 0.00 0.00 0.00 11035.03 90.00 59.89 8864.00 2453.47 3490.71 6.00 0.77 5.95 82.59 05-02a t2 11086.86 93.11 59.89 8862.59 2479.46 3535.53 6.00 6.00 0.00 0.04 11322.15 93.11 59.89 8849.83 2597.31 3738.77 0.00 0.00 0.00 0.00 11340.72 92.00 59.99 8849.00 2606.61 3754.83 6.00 -5.98 0.53 174.96 05-02a t3 11351.11 91.38 59.99 8848.69 2611.80 3763.82 6.00 -6.00 -0.05 -179.57 11962.65 91.38 59.99 8834.00 2917.62 4293.20 0.00 0.00 0.00 0.00 05-02a t4 Section 1: Start 9450.00 37.81 69.20 8431.38 1478.95 2584.37 2968.78 0.00 0.00 0.00 0,00 9470.00 38.08 65.32 8447.15 1483.70 2595.71 2980.83 12.00 1.35 -19.40 -85.08 ,-.... ~ BP Amoco Planning Report - Geographic Section 2: Start 9475.00 37.74 64.14 8451.09 1485.01 2598.49 2983.86 16.00 -6.82 -23.55 -115.71 9500.00 36.22 57.99 8471.07 1492.27 2611.64 2998.82 16.00 -6.08 -24.61 -114.78 9525.00 35.03 51.43 8491.40 1500.66 2623.52 3013.36 16.00 -4.74 -26.25 -109.86 9550.00 34.22 44.53 8511.98 1510.15 2634.06 3027.42 16.00 -3.25 -27.58 -104.53 9575.00 33.81 37.41 8532.71 1520.69 2643.22 3040.92 16.00 -1.65 -28.46 -98.85 9600.00 33.81 30.22 8553.49 1532.23 2650.95 3053.80 16.00 0.01 -28.77 -92.95 9625.00 34.23 23.11 8574.22 1544.71 2657.22 3065.99 16.00 1.67 -28.45 -86.97 9634.11 34.48 20.57 8581.74 1549.49 2659.14 3070.27 15.97 2.74 -27.88 -81.16 Section 3: Start 9700.00 34.48 20.57 8636.05 1584.41 2672.25 3100.74 0,00 0.00 0.00 0.00 9793.11 34.48 20.57 8712.80 1633.77 2690.76 3143.79 0.00 0.00 0.00 0.00 Section 4: Start 9800.00 35.65 20.55 8718.44 1637.48 2692.15 3147.03 17.00 17.00 -0.36 -0.70 9825.00 39.90 20.47 8738.20 1651.82 2697.51 3159.52 17.00 17.00 -0.31 -0.68 9850.00 44.15 20.40 8756.76 1667.50 2703.35 3173.17 17.00 17.00 -0.26 -0.62 i 9875.00 48.40 20.34 8774.04 1684.43 2709.64 3187.88 17.00 17.00 -0.23 -0.57 I 9900.00 52.65 20.30 8789.93 1702.52 2716.34 3203.60 17.00 17.00 -0.20 -0.53 , 9925.00 56.90 20.25 8804.34 1721,68 2723.42 3220.21 17.00 17.00 -0.18 -0.50 i 9950.00 61.15 20.21 8817.21 1741.78 2730.83 3237.64 17.00 17.00 -0.16 -0.47 9975.00 65.40 20.17 8828.45 1762.74 2738.53 3255.79 17.00 17.00 -0.15 -0.45 , 10000.00 69,65 20.14 8838.00 1784.42 2746.49 3274.56 17.00 17.00 -0.14 -0.44 , 10025.00 73.90 20.11 8845.82 1806.71 2754.66 3293.85 17,00 17.00 -0.13 -0.42 10050.00 78.15 20.08 8851.86 1829.49 2762.99 3313.54 17.00 17.00 -0.12 -0.41 10075.00 82.40 20.05 8856.08 1852.63 2771.44 3333.54 17.00 17.00 -0.12 -0.40 10100.00 86.65 20.02 8858.46 1876.00 2779.96 3353,72 17.00 17.00 -0.12 -0.40 10116.74 89.50 20.00 8859.00 1891.73 2785.71 3367.32 17.03 17.03 -0.10 -0,33 Section 5: Start 10125.00 89.50 20,99 8859.07 1899.47 2788.60 3374.06 12.00 0.04 12,00 89,80 10150.00 89.52 23.99 8859.29 1922.56 2798.16 3394.95 12.00 0.05 12.00 89.79 10175.00 89.53 26.99 8859.49 1945.12 2808.92 3416.53 12.00 0.05 12.00 89.77 10200.00 89.54 29.99 8859.70 1967.09 2820.85 3438.74 12.00 0.06 12.00 89.74 10225.00 89.56 32.99 8859.89 1988.41 2833.90 3461.52 12.00 0.06 12.00 89.72 10250.00 89.57 35.99 8860.08 2009.01 2848.06 3484.80 12.00 0.07 12.00 89.69 10275.00 89.59 38.99 8860.27 2028.84 2863.27 3508.54 12.00 0.07 12.00 89.67 10300.00 89.61 41.99 8860.44 2047.85 2879.50 3532.64 12.00 0.08 12.00 89.65 10325.00 89.63 44.99 8860.60 2065.99 2896.71 3557.07 12.00 0.08 12.00 89.63 10350.00 89.65 47.99 8860.76 2083.20 2914.84 3581.73 12.00 0.08 12.00 89.61 10375.00 89.67 50.99 8860.91 2099.43 2933.84 3606.58 12.00 0.09 12.00 89.59 10400.00 89.70 53.99 8861.04 2114.65 2953.67 3631.53 12.00 0.09 12.00 89.57 10425.00 89.72 56.99 8861.17 2128.82 2974.27 3656.53 12.00 0.09 12.00 89.55 10431.64 89.73 57.79 8861.21 2132.39 2979.86 3663.16 12.03 0.14 12.03 89.35 Section 6: Start 110500.00 89.73 57.79 8861.53 2168.83 3037.70 3731.48 0.00 0.00 0.00 0.00 110600.00 89.73 57.79 8862.00 2222.13 3122.31 3831-42 0,00 0.00 0.00 0.00 10700.00 89.73 57.79 8862.47 2275.43 3206.92 3931.36 0.00 0.00 0.00 0.00 10800.00 89.73 57.79 8862.95 2328.73 3291.53 4031.30 0.00 0.00 0.00 0.00 10900.00 89.73 57.79 8863.42 2382.03 3376.14 4131.24 0.00 0.00 0.00 0.00 10999.71 89.73 57.79 8863.92 2435.20 3460.49 4230.89 0.00 0.00 0.00 0.00 .r---. ~ BP Amoco Planning Report - Geographic Section 6: Start Section 7: Start 11035.03 90.00 59.89 8864.00 2453.47 3490.71 4266.15 5.99 0.76 5.95 82.68 Section 8: Start 11050.00 90.90 59.89 8863.88 2460.98 3503.66 4281.08 6.00 6.00 0.00 0.04 11086.86 93.11 59.89 8862.59 2479.46 3535.53 4317.83 6.00 6.00 0.00 -0.02 Section 9: Start Section 10: Start 8849.00 2606.61 3754.83 4570.68 6.00 -5.98 0.54 Section 11 : Start i 11351.11 91.38 59.99 8848.69 2611.80 3763.82 4581.03 5.97 -5.97 0.00 180.00 Section 12 : Start 11400.00 91.38 59.99 8847.51 2636.25 3806.14 4629.78 0.00 0.00 0.00 0.00 11500.00 91.38 59.99 8845.10 2686.25 3892.71 4729.48 0.00 0.00 0.00 0.00 11600.00 91.38 59.99 8842.70 2736.25 3979.28 4829.18 0.00 0.00 0.00 0.00 11700.00 91.38 59.99 8840.29 2786.25 4065.85 4928.89 0.00 0.00 0.00 0.00 11800.00 91.38 59.99 8837.88 2836.25 4152.42 5028.59 0.00 0.00 0.00 0.00 11900.00 91.38 59.99 8835.47 2886.25 4238.99 5128.30 0.00 0.00 0.00 0.00 11962.65 91.38 59.99 8834.00 2917.62 4293.20 5190.77 0.00 0.00 0.00 0.00 Survey 9450.00 37.81 69.20 8431.38 1478.95 2584.37 5950352.38 700729.40 70 16 5.786 N 148 22 35.979 W 9470.00 38.08 65.32 8447.15 1483.70 2595.71 5950357.43 700740.61 70 16 5.833 N 148 22 35.648 W 9475.00 37.74 64,14 8451.09 1485.01 2598.49 5950358.81 700743.35 70 16 5.846 N 148 22 35.568 W 9500.00 36.22 57.99 8471.07 1492.27 2611.64 5950366.41 700756.31 70 16 5.917 N 14822 35.185 W 9525.00 35.03 51.43 8491.40 1500,66 2623.52 5950375.11 700767.96 70 16 5.999 N 148 22 34.839 W 9550.00 34.22 44.53 8511.98 1510.15 2634.06 5950384.87 700778.25 70 16 6.093 N 148 22 34.532 W 9575.00 33.81 37.41 8532.71 1520,69 2643.22 5950395.65 700787.13 70 16 6.196 N 14822 34.265 W 9600.00 33.81 30.22 8553.49 1532.23 2650.95 5950407.39 700794.56 70 16 6.310 N 148 22 34.040 W 9625.00 34.23 23.11 8574.22 1544.71 2657.22 5950420.03 700800.49 70 16 6.433 N 148 22 33.857 W 9634.11 34.48 20.57 8581.74 1549.49 2659.14 5950424.86 700802.29 70 16 6.480 N 148 22 33.801 W ---- r---. ~ BP Amoco Planning Report - Geographic Survey 9700.00 34.48 20.57 8636.05 1584.41 2672.25 5950460.12 700814.47 70 16 6.823 N 148 22 33.420 W 9793.11 34.48 20.57 8712.80 1633.77 2690.76 5950509.94 700831.67 70 16 7.308 N 148 22 32.880 W 9800.00 35.65 20.55 8718.44 1637.48 2692.15 5950513.68 700832.97 70 16 7.345 N 148 22 32.840 W 9825.00 39.90 20.47 8738.20 1651.82 2697.51 5950528.16 700837.95 70 16 7.486 N 148 22 32.683 W 9850.00 44.15 20.40 8756.76 1667.50 2703.35 5950543.98 700843.38 70 16 7.640 N 14822 32.513 W 9875.00 48.40 20.34 8774.04 1684.43 2709.64 5950561.08 700849.22 70 16 7.806 N 148 22 32.330 W 9900.00 52.65 20.30 8789.93 1702.52 2716.34 5950579.34 700855.44 70 16 7.984 N 148 22 32.135W 9925.00 56.90 20.25 8804.34 1721.68 2723.42 5950598.67 700862.00 70 16 8.173 N 148 22 31.929 W 9950.00 61.15 20.21 8817.21 1741.78 2730.83 5950618.96 700868.88 70 16 8.370 N 148 22 31.713 W 9975.00 65.40 20.17 8828.45 1762.74 2738.53 5950640.11 700876.03 70 16 8.577 N 148 22 31.488 W 10000.00 69.65 20.14 8838.00 1784.42 2746.49 5950661.99 700883.42 70 16 8.790 N 148 22 31.256 W 10025.00 73.90 20.11 8845.82 1806.71 2754.66 5950684.49 700891.00 70 16 9.009 N 148 22 31.018W 10050.00 78.15 20.08 8851.86 1829.49 2762.99 5950707.48 700898.72 70 16 9.233 N 148 22 30.775 W 10075.00 82.40 20.05 8856.08 1852.63 2771.44 5950730.83 700906.56 70 16 9.460 N 148 22 30.529 W 10100.00 86.65 20.02 8858.46 1876.00 2779.96 5950754.42 700914.47 70 16 9.690 N 148 22 30.281 W 10116.74 89.50 20.00 8859.00 1891.73 2785.71 5950770.30 700919.80 70 16 9.845 N 148 22 30.113 W 10125.00 89.50 20.99 8859.07 1899.47 2788.60 5950778.10 700922.48 70 16 9,921 N 148 22 30.029 W 10150.00 89.52 23.99 8859.29 1922.56 2798.16 5950801.44 700931.43 70 16 10.148N 148 22 29.751 W 10175.00 89.53 26.99 8859.49 1945.12 2808.92 5950824.28 700941.59 70 16 10.370 N 148 22 29.437 W 10200.00 89.54 29.99 8859.70 1967.09 2820.85 5950846.55 700952.93 70 16 10.586 N 148 22 29.090 W 10225.00 89.56 32.99 8859.89 1988.41 2833.90 5950868.20 700965.42 70 16 10.796 N 148 22 28.710 W 10250.00 89.57 35.99 8860.08 2009.01 2848.06 5950889.17 700979.03 70 16 10.998 N 148 22 28.297 W 10275.00 89.59 38.99 8860.27 2028.84 2863.27 5950909.40 700993.72 70 16 11.193 N 148 22 27.854 W 10300.00 89.61 41.99 8860.44 2047.85 2879.50 5950928.82 701009.44 70 16 11.380 N 148 22 27.381 W 10325.00 89.63 44.99 8860.60 2065.99 2896.71 5950947.40 701026.16 70 16 11.558 N 148 22 26.880 W 10350.00 89.65 47.99 8860.76 2083.20 2914.84 5950965.08 701043.83 70 16 11.728 N 148 22 26.353 W 10375.00 89.67 50.99 8860.91 2099.43 2933.84 5950981.82 701062.40 70 16 11.887 N 148 22 25.799 W 10400.00 89.70 53.99 8861.04 2114.65 2953.67 5950997.55 701081.82 70 16 12,037 N 148 22 25.222 W 10425.00 89.72 56.99 8861.17 2128.82 2974.27 5951012.25 701102.04 70 16 12.176 N 148 22 24.622 W 10431.64 89.73 57.79 8861.21 2132.39 2979.86 5951015.97 701107.53 70 16 12.211 N 148 22 24.459 W 10500.00 89.73 57.79 8861.53 2168.83 3037.70 5951053.91 701164.39 70 16 12.569 N 148 22 22.775 W 10600.00 89.73 57.79 8862.00 2222.13 3122.31 5951109.42 701247.56 70 16 13.093 N 148 22 20.311 W 10700.00 89.73 57.79 8862.47 2275.43 3206.92 5951164.93 701330.73 70 16 13.617 N 14822 17.848 W 10800.00 89.73 57.79 8862.95 2328.73 3291.53 5951220.44 701413.91 70 16 14.141 N 14822 15.384 W 10900.00 89.73 57.79 8863.42 2382.03 3376.14 5951275.94 701497.08 70 16 14.665 N 148 22 12.920 W 10999.71 89.73 57.79 8863.92 2435.20 3460.49 5951331.31 701580.00 70 16 15.187 N 148 22 10.464 W 11035.03 90.00 59.89 8864.00 2453.47 3490.71 5951350.37 701609.73 70 16 15.367 N 148 22 9.584 W 11050,00 90.90 59.89 8863.88 2460.98 3503.66 5951358.21 701622.47 70 16 15.441 N 148 22 9.207 W 11086.86 93.11 59.89 8862.59 2479.46 3535.53 5951377.53 701653.84 70 16 15.622 N 148 22 8.279 W 11100.00 93,11 59.89 8861.88 2486.04 3546.88 5951384.40 701665.02 70 16 15.687 N 14822 7.948 W 11200.00 93.11 59.89 8856.45 2536.13 3633.26 5951436.75 701750,04 70 16 16.179 N 148 22 5.433 W I 11300.00 93.11 59.89 8851.03 2586.23 3719.64 5951489.10 701835.07 70 16 16.671 N 148 22 2.917 W 11322.15 93.11 59.89 8849.83 2597.31 3738.77 5951500.68 701853,90 70 16 16.780 N 148 22 2.360 W 11340.72 92.00 59.99 8849.00 2606.61 3754.83 5951510.40 701869.71 70 16 16.872 N 148 22 1.892 W 11351,11 91.38 59.99 8848.69 2611,80 3763.82 5951515.82 701878.56 70 16 16.923 N 148 22 1.631 W 11400.00 91.38 59.99 8847.51 2636.25 3806,14 5951541.37 701920.22 70 16 17.163 N 14822 0.398 W 11500.00 91,38 59.99 8845.10 2686.25 3892.71 5951593.63 702005.44 70 16 17.654 N 148 21 57.877 W 11600.00 91.38 59.99 8842.70 2736.25 3979,28 5951645,89 702090.66 70 16 18.146 N 148 21 55.356 W 11700.00 91.38 59.99 8840.29 2786.25 4065,85 5951698.15 702175.88 70 16 18.637 N 14821 52.835 W 11800.00 91.38 59.99 8837.88 2836.25 4152.42 5951750.41 702261.09 70 16 19.128N 148 21 50.314 W 11900.00 91.38 59.99 8835.47 2886.25 4238,99 5951802.67 702346,31 70 16 19.619 N 148 21 47.793 W 11962.65 91.38 59.99 8834.00 2917.62 4293.20 5951835.45 702399.68 70 16 19.928 N 148 21 46.214 W ~ 64.01 ,,-....., ,-...., BP Amoco Anticollision Report GLOBAL SCAN APPLIED: All wellpaths within 200'+ 10011000 of reference - There ardWmtÐèftelis in thfi'~al Plan & PLANNED PROGRAM Interpolation Method: MD Interval: 25.00 ft Error Model: ISCWSA Ellipse Depth Range: 9450.00 to 11962.65 ft Scan Method: Tray Cylinder North Maximum Radius: 1393.27 ft Error Surface: Ellipse + Casing Survey Program for Definitive Wellpath Date: 8/8/2001 Validated: No Planned From To Survey ft ft 95.00 9450.00 9450.00 11962.65 Version: Toolcode 4 Tool Name 1 : Camera based gyro multisho Planned: 05-02a wp03 V1 CB-GYRO-MS MWD Camera based gyro multishot MWD - Standard Casing Points 11962.64 8833.90 4.500 6.125 41/2" Summary 05-02 V1 FAIL: Major Risk 05-18A V1 Out of range Plan 05-32A COIL VO PI 11831.34 12175.00 876.31 629.31 247.16 Pass: Major Risk Plan 5-32A V3 Plan: 5- 11881.36 12129.93 880.93 635.03 245.96 Pass: Major Risk 11-38 V5 11945.43 12525.00 842.52 690.52 158.00 Pass: Major Risk 11-38A V1 10858.83 13775.00 1148.82 721.68 436.71 Pass: Major Risk Site: PB DS 05 Well: 05-02 Wellpath: 05-02 V1 Rule Assigned: Inter-Site Error: Major Risk 0,00 ft 9469.96 8447.12 9475.00 8452.23 154.15 155.85 166.40 101.08 0.91 961.37 -930.58 FAIL 9494.77 8466.86 9500.00 8472.05 154.34 156.97 155.42 96.11 2.94 968.41 -961.29 FAIL 9519.20 8486.66 9525.00 8491.88 153.96 157.47 146.27 93.29 6.56 967.04 -962.03 FAIL 9543.05 8506.24 9550.00 8511.71 152.98 157.35 140.46 93.98 11.82 966.63 -947.51 FAIL 9566.13 8525.35 9575.00 8531.53 151.48 156.67 136.46 96.51 18.67 959.68 -927.11 FAIL 9588.29 8543.76 9600.00 8551.34 149.53 155.51 133.48 99.89 27.03 951.33 -903.11 FAIL 9609.45 8561.34 9625.00 8571.17 147.23 153.97 131.13 103.61 36.77 940.68 -876.40 FAIL 9629.53 8577.97 9650.00 8591.02 144.71 152.10 129.21 107.36 47.79 927.21 -847.48 FAIL 9650.91 8595.59 9675.00 8610.89 144.07 152.23 128.32 107.75 59,65 924.64 -830.87 FAIL 9672.92 8613.73 9700.00 8630.78 144.07 153.04 127.89 107.32 71.50 927.02 -819.32 FAIL 9694.93 8631.88 9725.00 8650.71 144.08 153.85 127.62 107.05 83.34 929.41 -808.43 FAIL 9716.95 8650.03 9750.00 8670.67 144.08 154.65 127.45 106.88 95.17 931.77 -797.97 FAIL 9738.98 8668.18 9775.00 8690.67 144.08 155.45 127.35 106.78 107.00 934.13 -787.86 FAIL 9761.01 8686.34 9800.00 8710.71 144.08 156.24 127.30 106.73 118.82 936.48 -777.96 FAIL 9783.04 8704.50 9825.00 8730.77 144.08 157.04 127.28 106.71 130.63 938.83 -768.23 FAIL 9803.73 8721.45 9850.00 8750.86 143.06 156.69 127.36 106.82 142.49 935.51 -755.58 FAIL 9822.94 8736.60 9875.00 8770.98 141.16 155.30 127.82 107.35 154.70 926.98 -741.15 FAIL 9841.60 8750.65 9900.00 8791.13 139.24 153.86 128.64 108.21 167.29 917.90 -726.83 FAIL 9859.62 8763.55 9925.00 8811.31 137.35 152.40 129.69 109.32 180.31 908.49 -711.82 FAIL 9875.00 8774.02 9950.00 8831.52 135.72 151.21 130.93 110.58 193.78 900.21 -696.54 FAIL 9893.47 8785.90 9975.00 8851.76 133.75 149.59 132.28 111.97 207.69 889.16 -677.54 FAIL 9909,22 8795.40 10000.00 8872,03 132.10 148.29 133,70 113.42 222,11 879,50 -657.69 FAIL 9925.00 8804.32 10025.00 8892.34 130.46 146.99 135.15 114.90 237.04 869.29 -635.24 FAIL 9938.29 8811.35 10050.00 8912.70 129.14 146.01 136.62 116.39 252.47 863.72 -612.18 FAIL 9950.00 8817.18 10075.00 8933.08 127.97 145.24 138,06 117.85 268.40 858.90 -587.99 FAIL ~ r---., BP Amoco Anticollision Report Site: PB DS 05 Well: 05-02 Wellpath: 05-02 V1 Rule Assigned: Inter-Site Error: Major Risk 0.00 ft 9964.18 8823.76 10100.00 8953.50 126.67 144.21 139.47 119.28 284.81 852.62 -559.68 FAIL 9975.00 8828.42 10125.00 8973.94 125.67 143.60 140.84 120.66 301.70 847.95 -532.13 FAIL 9987.13 8833.27 10150.00 8994.41 124.68 142.89 142.15 122.00 319.03 842.52 -501.67 FAIL 10000.00 8837.97 10175.00 9014.91 123.62 142.16 143.41 123.27 336.82 836.28 -468.59 FAIL 10007.42 8840.47 10200.00 9035.44 123.11 142.02 144.62 124.49 355.00 833.47 -439.77 FAIL 10016.66 8843.37 10225.00 9055.98 122.46 141.76 145.76 125.64 373.58 829.82 -407.90 FAIL 10025.00 8845.78 10250.00 9076.52 121.88 141.62 146.84 126.73 392.54 828.67 -375.91 FAIL 10033.54 8848.05 10275.00 9097.06 121.41 141.50 147.86 127.76 411.85 827.68 -342.94 FAIL 10041.25 8849.91 10300.00 9117.61 120.98 141.49 148.82 128.73 431.49 826.79 -310.10 FAIL 10050.00 8851.81 10325.00 9138.15 120.49 141.44 149.72 129.65 451.43 825.38 -275.23 FAIL 10050.00 8851.81 10350.00 9158.69 120.49 142.00 150.57 130.50 471.72 827.05 -250.92 FAIL 10061.86 8854.04 10375.00 9179.23 120.03 141.82 151.38 131.32 492.15 824.80 -211.17 FAIL 10067.98 8855.03 10400.00 9199.77 119.79 142.04 152.14 132.09 512.89 824.30 -178,24 FAIL 10075.00 8856.03 10425.00 9220.31 119.51 142.24 152.86 132.81 533.87 823.37 -143.69 FAIL 10075.00 8856.03 10450.00 9240.85 119.51 142.78 153.53 133.49 555,08 824,99 -118.53 FAIL 10084.44 8857.15 10475.00 9261.39 119.30 142.93 154.17 134.14 576.43 823.44 -80.25 FAIL 10089.37 8857.63 10500.00 9281.93 119.19 143.29 154.78 134.75 598.01 823.52 -47.91 FAIL 10100.00 8858.41 10525.00 9302.48 118.96 143.57 155.34 135.32 619.82 824,94 -7.16 FAIL 10100.00 8858.41 10550.00 9323.02 118.96 144.14 155.89 135.88 641.66 826.64 18.36 Pass 10100.00 8858.41 10575.00 9343,56 118,96 144.70 156.41 136.39 663.73 828.32 43.85 Pass 10106.76 8858.74 10600.00 9364,10 118.91 145.14 156.90 136.89 685.92 830.02 79.31 Pass 10110.61 8858.86 10625.00 9384.64 118.88 145.65 157.36 137.36 708,25 831.66 110.62 Pass 10116.74 8858.97 10650.00 9405.18 118.84 146.15 157.80 137.80 730.72 833,21 145.52 Pass 10447.56 8861.25 10675.00 9425.72 154.56 197.12 196.11 138.32 749.041089.64 2.35 Pass 10461.54 8861.32 10700.00 9446.26 154.57 197.96 196.95 139.16 766.541092.21 29.53 Pass 10475.53 8861.38 10725.00 9466.81 154.59 198.81 197.76 139.97 784.191094.77 56.55 Pass 10489.52 8861.45 10750.00 9487.35 154.60 199.64 198.52 140.73 801.981097.32 83.41 Pass 10503.50 8861.52 10775.00 9507.89 154.61 200.48 199.26 141.47 819.921100.16 109.92 Pass 10517.49 8861.58 10800.00 9528.43 154.62 201.31 199.96 142.17 837.981102.69 136.45 Pass Site: PB DS 05 Well: 05-32 Rule Assigned: Major Risk Wellpath: Plan 05-32A COIL VO Plan: 05-32A Coil wp01 V1 Inter-Site Error: 0.00 ft 10350.00 8860.73 10275.00 8841.05 151.30 25.55 318.86 270.86 3.500 1376.45 565.97 812.81 Pass 10350.00 8860.73 10300.00 8841.25 151.30 25.64 318.86 270.87 3.500 1357.24 566.11 793.35 Pass 10360.87 8860.80 10325.00 8841.45 151.94 25.64 320.17 270.87 3.500 1337.40 567.86 771.61 Pass 10364.74 8860.82 10350.00 8841.64 152.17 25.69 320.64 270.88 3.500 1317.12 568.58 750.49 Pass 10375.00 8860.88 10375.00 8841.83 152.77 25.70 321.87 270.88 3.500 1296.60 570.24 728.17 Pass 10375.00 8860.88 10400.00 8842.02 152.77 25.78 321.88 270.89 3.500 1276.57 570.39 707.88 Pass 10375.00 8860.88 10425.00 8842.21 152.77 25.88 321.89 270.90 3.500 1257.37 570.63 688.39 Pass 10375.00 8860.88 10450.00 8842.40 152.77 25.97 321.90 270.91 3,500 1239.07 570.80 669.81 Pass 10386.68 8860.95 10475.00 8842.59 153.26 26.00 323.30 270.91 3.500 1221.55 572.16 650.75 Pass 10400.00 8861.02 10500.00 8842.77 153.82 26.02 324.90 270.91 3.500 1205.14 573.68 632.64 Pass 10400.00 8861.02 10525.00 8842.96 153.82 26.15 324.91 270.92 3.500 1189.57 573.95 616.68 Pass 10400.00 8861.02 10550.00 8843.14 153.82 26.28 324.92 270.92 3.500 1175.17 574,29 601.88 Pass 10409.60 8861.07 10575.00 8843.31 154.06 26.35 326.07 270.92 3.500 1161.86 575,06 587.63 Pass 10416.00 8861.10 10600.00 8843.49 154.22 26.46 326.84 270.93 3.500 1149.75 575.68 574.74 Pass 10425.00 8861.15 10625.00 8843.66 154.45 26.55 327.92 270.93 3.500 1138.86 576.46 562.90 Pass 10431.64 8861.18 10650.00 8843.82 154.55 26.67 328.72 270.93 3.500 1129,23 576.95 552.64 Pass ----- "...-...... ~ BP Amoco Anticollision Report Site: PB DS 05 Well: 05-32 Wellpath: Plan 05-32A COIL VO Plan: 05-32A Coil wp01 V1 Rule Assigned: Inter-Site Error: Major Risk 0.00 ft 10447.82 8861.25 10675.00 8843.99 154.56 26.84 328.72 270.93 3.500 1120.82 577.61 543.66 Pass 10471.70 8861.37 10700.00 8844.14 154.58 27.01 328.73 270.94 3.500 1113.42 578.08 535.68 Pass 10495.86 8861.48 10725.00 8844.30 154.60 27.20 328.73 270.94 3.500 1107.01 578.59 528.66 Pass 10520.27 8861.60 10750.00 8844.45 154.63 27.38 328.73 270.94 3.500 1101.61 579.40 522.64 Pass 10544.88 8861.71 10775.00 8844.59 154.65 27.57 328.74 270.95 3.500 1097.23 579.95 517.61 Pass 10569.65 8861.83 10800.00 8844.73 154.67 27.75 328.74 270.95 3.500 1093.87 580.49 513.61 Pass 10594.54 8861.95 10825.00 8844.86 154.70 27.95 328.74 270.95 3.500 1091.53 581.06 510.62 Pass 10619.50 8862.06 10850.00 8844.98 154.73 28.14 328.74 270.95 3.500 1090.23 581.93 508.66 Pass 10644.50 8862.18 10875.00 8845.10 154.75 28.33 328.74 270.95 3.500 1089.97 582.54 507.73 Pass 10669.49 8862.30 10900.00 8845.22 154.78 28.53 328.74 270.95 3.500 1090,74 583.13 507.83 Pass 10694.42 8862.42 10925.00 8845.32 154.81 28.72 328.74 270.95 3.500 1092.55 583.74 508.97 Pass 10719.26 8862.53 10950.00 8845.42 154.84 28.91 328.74 270.95 3.500 1095.39 584.66 511.13 Pass 10743.95 8862.65 10975.00 8845.52 154.87 29.10 328.74 270.95 3.500 1099.26 585.29 514.32 Pass 10768.47 8862.76 11000.00 8845.60 154.91 29,30 328.73 270.94 3.500 1104.14 585.91 518.54 Pass 10792.76 8862.88 11025.00 8845,68 154.94 29.48 328.73 270.94 3.500 1110.04 586.54 523.78 Pass . 10816.79 8862.99 11050.00 8845.75 154.97 29.67 328.73 270.94 3.500 1116.94 587.47 530.01 Pass ¡ 10840.69 8863.11 11075.00 8845.80 155.00 29.85 328.72 270.93 3.500 1124.29 588.11 536.70 Pass . 10864.83 8863.22 11100.00 8845.79 155.04 30.04 328.72 270.93 3.500 1130.76 588.74 542.51 Pass . 10889.21 8863.33 11125.00 8845.71 155.07 30.23 328.73 270.94 3.500 1136.29 589.39 547.35 Pass 10913.78 8863.45 11150.00 8845.57 155.11 30.43 328.74 270.95 3.500 1140.88 590.34 551.24 Pass i 10938.51 8863.57 11175.00 8845.37 155.15 30,64 328.75 270,96 3.500 1144.51 591.04 554.12 Pass 10963,37 8863.68 11200.00 8845.10 155.19 30.85 328.77 270.98 3.500 1147.18 591.74 556.04 Pass 10988.31 8863.80 11225.00 8844.75 155.23 31.07 328.79 271.00 3.500 1148.85 592.47 556.91 Pass 10999.71 8863.85 11250.00 8844.20 155.25 31.30 328.82 271.03 3.500 1149.45 593.26 556.77 Pass 11017.32 8863.92 11275.00 8843.47 155.32 31.51 329.91 271.07 3.500 1149.08 593.96 555.57 Pass 11035.03 8863.94 11300.00 8842.56 155.40 31.71 331.01 271.12 3.500 1147.93 594.64 553.61 Pass 11046.38 8863.87 11325.00 8841.45 155.41 31.97 331.06 271.17 3.500 1145.81 595.43 550.66 Pass 11071.80 8863.23 11350.00 8840.17 155.46 32.23 331.10 271.21 3.500 1142.61 596,35 546.56 Pass 11096.80 8861.99 11375.00 8838.70 155.50 32.50 331.11 271.22 3.500 1138.25 597.22 541.27 Pass 11121.19 8860.67 11400.00 8837.05 155.55 32.76 331.14 271.25 3.500 1132.76 598.36 534.85 Pass 11145.28 8859.36 11425.00 8835.24 155.59 33.03 331.17 271.28 3.500 1126.15 599.20 527.30 Pass 11169.04 8858.07 11450.00 8833.25 155.64 33.29 331.21 271.32 3.500 1118.43 600.02 518.65 Pass 11192.41 8856.81 11475.00 8831.10 155.68 33.56 331.27 271.38 3.500 1109.62 600.85 508.91 Pass 11215.34 8855.56 11500.00 8828.79 155.72 33.83 331.34 271.45 3.500 1099.75 601.98 498.11 Pass 11237.77 8854.34 11525.00 8826.32 155.77 34.09 331.42 271.53 3.500 1088.83 602.79 486.26 Pass 11259.66 8853.16 11550.00 8823.70 155.81 34.35 331.51 271.62 3.500 1076.88 603.60 473.41 Pass 11280.96 8852.00 11575.00 8820.94 155.86 34.61 331.62 271.73 3.500 1063.95 604.49 459.54 Pass 11301.62 8850.88 11600.00 8818.05 155.90 34.86 331.74 271.85 3.500 1050.05 605.44 444.72 Pass 11321.59 8849.80 11625.00 8815.02 155.94 35.11 331.87 271.98 3.500 1035.22 606.43 428.94 Pass 11339.16 8848.99 11650.00 8812.04 155.97 35.35 332.11 272.13 3.500 1020.27 607.32 413.13 Pass 11358.88 8848.45 11675.00 8809.31 156.00 35.60 332.28 272.29 3.500 1006.00 608.11 398.12 Pass 11379,70 8847.94 11700.00 8806.83 156.04 35.85 332.42 272.43 3.500 992.40 609.09 383.58 Pass 11400.98 8847.43 11725.00 8804.61 156.08 36.11 332.56 272.57 3,500 979.48 609.81 370.00 Pass 11422.70 8846.91 11750.00 8802.64 156.13 36.37 332.67 272.68 3.500 967.26 610.87 356.77 Pass 11444.82 8846.38 11775.00 8800.92 156.18 36.65 332.78 272.79 3.500 955.76 611.96 344.21 Pass 11467.33 8845.83 11800.00 8799.47 156.23 36.92 332.86 272.87 3.500 944.97 613.06 332.36 Pass 11490.19 8845.28 11825.00 8798.27 156.28 37.20 332.93 272.94 3.500 934.92 614.19 321.22 Pass 11513.37 8844.72 11850,00 8797.34 156.34 37.48 332.99 273.00 3,500 925.61 615.00 311.12 Pass ! 11536.86 8844.16 11875.00 8796.68 156.40 37.77 333.02 273.03 3.500 917.06 616.16 301.43 Pass 11560.61 8843.59 11900.00 8796.27 156.45 38.06 333.04 273.05 3,500 909.27 617.32 292.50 Pass 11584.61 8843.01 11925.00 8796.14 156.51 38.35 333.03 273.04 3.500 902.26 618.49 284.31 Pass ,~ ~, BP Amoco Anticollision Report Site: PB DS 05 Well: 05-32 Wellpath: Plan 05-32A COIL VO Plan: 05-32A Coil wp01 V1 Rule Assigned: Inter-Site Error: Major Risk 0,00 ft 11608.81 8842.43 11950,00 8796,27 156,57 38.64 333,01 273,02 3.500 896.03 619,35 277,22 Pass 11633.20 8841.84 11975,00 8796.66 156.64 38,94 332,96 272,97 3.500 890.59 620.54 270.58 Pass 11657.75 8841.25 12000.00 8797.32 156.70 39.24 332.90 272.91 3.500 885.95 621.72 264.73 Pass 11682.42 8840.65 12025.00 8798.24 156.76 39.54 332.81 272.82 3.500 882.12 622.91 259.67 Pass 11707.18 8840.06 12050.00 8799.42 156.83 39.83 332.71 272.72 3.500 879.10 623.78 255.74 Pass 11732.00 8839.46 12075.00 8800.87 156.90 40.13 332.58 272.59 3.500 876.89 624.96 252.30 Pass 11756.86 8838.86 12100.00 8802.58 156.96 40.43 332.43 272.44 3.500 875.50 626.14 249.69 Pass 11781.72 8838.26 12125.00 8804.54 157.03 40.72 332.26 272.27 3.500 874.94 627.31 247.90 Pass 11806.56 8837.66 12150.00 8806.76 157.10 41.01 332.08 272.09 3.500 875.21 628.16 247.27 Pass 11831.34 8837.07 12175.00 8809.23 157.17 41.30 331.88 271.89 3.500 876.31 629.31 247.16 Pass 11856.03 8836.47 12200.00 8811.95 157.24 41.59 331.66 271.67 3.500 878.24 630.45 247.90 Pass 11880.61 8835.88 12225.00 8814.92 157.31 41.87 331.42 271.43 881.00 631.58 249.49 Pass 11881.40 8835.86 12225.80 8815.02 157.32 41.88 331.41 271.42 881.10 631.61 249.55 Pass Site: PB OS 05 Well: 05-32 Rule Assigned: Major Risk Wellpath: Plan 5-32A V3 Plan: 5-32A wp02 V1 Inter-Site Error: 0.00 ft 10375.00 8860.88 10325.00 8841,39 152.77 25.75 321.83 270.84 4.750 1389.99 570.90 821.35 Pass 10375.00 8860.88 10350.00 8841.50 152.77 25.87 321.84 270.85 4.750 1380.09 571.21 811.09 Pass 10375.00 8860.88 10375.00 8841.61 152.77 25.99 321.84 270.85 4.750 1370.58 571.46 801.23 Pass 10387.15 8860.95 10400.00 8841.73 153.28 25,98 323.30 270.85 4.750 1361.25 572.79 790.40 Pass 10400.00 8861.02 10425.00 8841.84 153.82 25.99 324.84 270,85 4,750 1352.34 574.24 779.86 Pass 10400.00 8861.02 10450.00 8841.95 153.82 26.14 324.85 270.86 4.750 1343.59 574.56 770.69 Pass 10400.00 8861.02 10475,00 8842.07 153.82 26.28 324.85 270.86 4.750 1335.25 574.95 761.92 Pass 10411.80 8861.08 10500.00 8842.18 154.12 26.30 326.27 270.86 4.750 1327.14 575.72 752.88 Pass 10425.00 8861.15 10525.00 8842.29 154.45 26.32 327.85 270.86 4.750 1319.45 576.58 744.14 Pass 10425.00 8861.15 10550.00 8842.41 154.45 26.49 327.85 270,86 4.750 1311.94 576.98 736.12 Pass 10431.64 8861.18 10575.00 8842.52 154.55 26.58 328.65 270.86 4.750 1304.81 577.42 728.43 Pass 10452.73 8861.28 10600.00 8842.64 154,57 26.75 328.66 270,87 4.750 1297.88 578.07 720.95 Pass 10476.75 8861.39 10625.00 8842.75 154.59 26,94 328.66 270.87 4.750 1290.96 578.59 713.39 Pass 10500.77 8861.50 10650.00 8842.86 154.61 27.13 328.67 270.88 4.750 1284.04 579.41 705.84 Pass 10524.79 8861.62 10675.00 8842.98 154.63 27.31 328.67 270.88 4.750 1277.11 579.93 698.29 Pass 10548.81 8861.73 10700.00 8843.09 154.65 27.50 328.68 270.89 4.750 1270.19 580.45 690.73 Pass 10572.84 8861.84 10725.00 8843.20 154.68 27.70 328.68 270.89 4.750 1263.27 581.03 683.12 Pass 10596.86 8861.96 10750.00 8843.32 154,70 27.90 328.69 270,90 4.750 1256.34 581.61 675.51 Pass 10620.88 8862.07 10775.00 8843.43 154.73 28.10 328.69 270.90 4.750 1249.42 582.49 667.90 Pass 10644.90 8862.18 10800,00 8843.54 154.75 28.30 328.70 270.91 4.750 1242.50 583.07 660.29 Pass 10668.92 8862.30 10825.00 8843.66 154.78 28.52 328.70 270.91 4.750 1235.57 583.70 652.62 Pass 10692.95 8862.41 10850.00 8843.77 154.81 28.74 328.71 270.92 4.750 1228.65 584.33 644.96 Pass 10716.97 8862.52 10875.00 8843.88 154.84 28.96 328.71 270.92 4.750 1221.73 585.26 637.29 Pass 10740.99 8862.64 10900.00 8844.00 154.87 29.17 328.72 270.93 4.750 1214.80 585,89 629.63 Pass 10765.01 8862.75 10925.00 8844.11 154.90 29.41 328.72 270.93 4.750 1207.88 586.58 621.91 Pass 10789.03 8862.86 10950.00 8844.22 154.93 29.64 328.73 270.94 4.750 1200.95 587.26 614.19 Pass 10813.06 8862.97 10975.00 8844.34 154.96 29.87 328,73 270,94 4.750 1194,03 588,24 606.48 Pass 10837.08 8863.09 11000.00 8844.45 155.00 30.10 328.74 270.95 4.750 1187.11 588.93 598.76 Pass 10861.10 8863,20 11025.00 8844.56 155.03 30.34 328.74 270.95 4.750 1180.18 589.66 590,99 Pass 10885.12 8863.31 11050.00 8844.68 155.07 30.59 328.75 270.96 4.750 1173.26 590.40 583.23 Pass 10909.14 8863.43 11075.00 8844.79 155.10 30.83 328.75 270.96 4.750 1166.34 591.42 575.47 Pass 10933.17 8863.54 11100.00 8844.90 155.14 31.07 328.76 270.97 4,750 1159.41 592,15 567.71 Pass ,~ ~ BP Amoco Anticollision Report Site: PB DS 05 Well: 05-32 Wellpath: Plan 5-32A V3 Plan: 5-32A wp02 V1 Rule Assigned: Inter-Site Error: Major Risk 0.00 ft 10957.15 8863.65 11125.00 8845.00 155.18 31.31 328.77 270.98 4.750 1152.36 592.89 559.80 Pass 10980.96 8863.77 11150.00 8844.96 155.22 31.55 328.78 270.99 4.750 1144.76 593.62 551.37 Pass 10999.71 8863.85 11175.00 8844.38 155.25 31.81 328.82 271.03 4.750 1137.08 594.48 542.83 Pass 11012.98 8863.91 11200.00 8843.14 155.30 32.04 329.68 271.10 4.750 1129.60 595.17 534.50 Pass 11023.99 8863.93 11225.00 8841.25 155.35 32.27 330.44 271.21 4.750 1122.41 596.00 526.40 Pass 11035.12 8863.94 11250.00 8838.89 155.40 32.52 331.23 271.34 4.750 1115.53 596.96 518.57 Pass 11059.78 8863.62 11275.00 8836.52 155.44 32.79 331.34 271.45 4.750 1108.78 597.88 510.92 Pass 11084.55 8862.65 11300.00 8834.14 155.48 33.05 331.43 271.54 4.750 1102.02 598.92 503.13 Pass . 11108.65 8861.35 11325.00 8831.77 155.52 33.33 331.49 271.60 4.750 1095.25 599.64 495.65 Pass 11132.69 8860.05 11350.00 8829.39 155.57 33.60 331.56 271.67 4.750 1088.48 600.71 487.82 Pass 11156.72 8858.74 11375.00 8827.02 155.61 33.88 331.63 271.74 4.750 1081.71 601.78 480.00 Pass 11180.75 8857.44 11400.00 8824.64 155.66 34.15 331.69 271.80 4.750 1074.95 602.84 472.19 Pass 11204.79 8856.13 11425.00 8822.27 155.70 34.43 331.76 271.87 4.750 1068.19 603.62 464.67 Pass 11228.82 8854.83 11450.00 8819.89 155.75 34.71 331.83 271.94 4.750 1061.42 604.72 456.82 Pass 11252.86 8853.53 11475.00 8817.71 155.80 34.97 331.89 272.00 4.750 1054.65 605.76 449.02 Pass 11276.91 8852.22 11500.00 8816.17 155.85 35.22 331.92 272.03 4.750 1047.85 606.79 441.20 Pass 11300.95 8850.92 11525.00 8815.27 155.90 35.46 331.91 272.02 4.750 1041.01 607.68 433.47 Pass I 11324.64 8849.63 11550.00 8815.03 155.95 35.69 331.88 271.98 4.750 1034.15 608.59 425.69 Pass I 8848.76 11575.00 8815.03 155.98 35.96 331.93 271.94 4,750 1027.49 609.59 418.03 Pass : 11346.38 11370,31 8848.17 11600.00 8815.03 156.02 36.23 331.91 271.92 4.750 1020.89 610.51 410.50 Pass 11394.42 8847.59 11625.00 8815.03 156.07 36.54 331.89 271.90 4.750 1014.28 611.67 402.74 Pass 11418.53 8847.01 11650.00 8815.03 156.12 36.84 331.87 271.88 4.750 1007.68 612.52 395.27 Pass 11442.64 8846.43 11675.00 8815.03 156.18 37.13 331.85 271.86 4,750 1001.08 613.70 387.49 Pass 11466.75 8845.85 11700.00 8815.03 156.23 37.43 331.82 271.83 4.750 994.47 614.86 379.72 Pass 11490.86 8845.27 11725.00 8815.03 156.29 37.74 331.80 271.81 4.750 987.87 616.07 371.91 Pass 11514.97 8844.69 11750.00 8815.03 156.34 38.05 331.78 271.79 4.750 981.26 616.96 364.41 Pass 11539.08 8844.11 11775.00 8815.03 156.40 38.35 331.76 271.77 4.750 974.66 618.17 356.60 Pass 11563.19 8843.52 11800.00 8815.03 156.46 38.65 331.74 271.75 4.750 968.06 619.36 348.80 Pass 11587.30 8842.94 11825.00 8815.03 156.52 38.97 331.71 271.72 4.750 961.46 620.60 340,96 Pass 11611.41 8842.36 11850.00 8815.03 156.58 39.28 331.69 271.70 4.750 954.85 621.51 333.43 Pass 11635.52 8841.78 11875.00 8815.03 156.64 39.59 331.67 271.68 4.750 948.25 622.74 325.60 Pass 11659.63 8841.20 11900.00 8815.03 156.70 39.89 331.64 271.65 4.750 941.65 623.97 317.77 Pass 11683.73 8840.62 11925.00 8815.03 156.77 40.21 331.62 271.63 4.750 935.04 625.23 309.90 Pass 11707.84 8840.04 11950.00 8815.03 156.83 40.53 331.60 271.61 4.750 928.44 626.17 302.35 Pass 11731.95 8839.46 11975.00 8815.03 156.90 40.85 331.57 271.58 4.750 921.84 627.43 294.49 Pass 11756.06 8838.88 12000.00 8815.03 156.96 41.16 331.55 271.56 4.750 915.24 628.68 286.64 Pass 11780.17 8838.30 12025.00 8815.03 157.03 41.48 331.52 271.53 4.750 908.64 629.96 278.75 Pass 11804.28 8837.72 12050.00 8815.03 157.09 41.81 331.50 271.51 4.750 902.04 630.93 271.18 Pass 11828.39 8837.14 12075.00 8815.03 157.16 42.13 331.47 271.48 4.750 895.43 632.21 263.29 Pass 11852.50 8836.56 12100.00 8815.03 157.23 42.44 331.44 271.45 4.750 888.83 633.48 255.41 Pass 11876.61 8835.98 12125.00 8815.03 157.30 42.77 331.42 271.43 4.750 882.23 634.78 247.51 Pass 11881.36 8835.86 12129.93 8815.03 157.32 42.83 331.41 271.42 880.93 635.03 245.96 Pass Site: PB DS 11 Well: 11-38 Rule Assigned: Major Risk Wellpath: 11-38 V5 Inter-Site Error: 0.00 ft 11945.43 11921.62 11897.99 8834.32 12525.00 8892.11 157.51 8834.89 12550.00 8893.10 157.43 8835.46 12575.00 8894.34 157.36 60.03 153.91 60.30 153.90 60.58 153.91 93.92 93.91 93.92 842.52 690.52 850.14 691.17 858.28 692.03 158.00 165.01 172.54 Pass Pass Pass -- r-- ---\ BP Amoco Anticollision Report Site: PB DS 11 Well: 11-38 Wellpath: 11-38 V5 Rule Assigned: Inter-Site Error: Major Risk 0.00 ft 11874.39 8836.03 12600.00 8895.53 157.30 60.86 153.91 93.92 866.54 692.70 180.17 Pass 11850.88 8836.60 12625.00 8896.43 157.23 61.14 153.90 93.91 875.04 693.39 188.00 Pass 11827.41 8837.16 12650.00 8896.99 157.16 61.42 153.86 93.87 883.61 694.07 195.92 Pass 11803.71 8837.73 12675.00 8897.49 157.09 61.69 153.82 93.83 891.57 694.72 203.23 Pass 11780.00 8838.30 12700.00 8898.01 157.03 61.97 153.78 93.79 899.46 695.70 210.48 Pass 11756.33 8838.87 12725.00 8898.55 156.96 62.24 153.75 93.76 907.49 696.39 217.85 Pass 11732.69 8839.44 12750.00 8899.09 156.90 62.52 153.71 93.72 915.61 697.06 225.31 Pass 11709.05 8840.01 12775.00 8899.64 156.83 62.79 153.68 93.69 923.71 697.73 232.76 Pass 11685.46 8840.58 12800.00 8900.18 156.77 63.07 153.64 93.65 931.97 698.74 240.35 Pass 11661.94 8841.15 12825.00 8900.66 156.71 63.36 153.61 93.62 940.42 699.45 248.09 Pass 11638.42 8841.71 12850.00 8901.15 156.65 63.63 153.57 93.58 948.87 700.13 255.88 Pass 11614.89 8842.28 12875.00 8901.66 156.59 63.91 153.53 93.54 957.31 700.82 263.66 Pass 11591.41 8842.85 12900.00 8902.12 156.53 64.19 153.50 93.51 965.85 701.84 271.52 Pass 11567.92 8843.41 12925.00 8902.51 156.47 64.47 153.46 93.47 974.41 702.56 279.36 Pass 11544.46 8843.98 12950.00 8902.83 156.42 64.76 153.41 93.42 983.00 703.29 287.24 Pass 11521.01 8844.54 12975.00 8903.07 156.36 65.04 153.36 93.37 991.61 704.00 295.15 Pass 11497.56 8845.11 13000.00 8903.24 156.30 65.32 153.31 93.32 1000.25 705.03 303.09 Pass 11474.21 8845.67 13025.00 8903.27 156.25 65.60 153.25 93.26 1009.12 705.75 311.23 Pass 11450.99 8846.23 13050.00 8903.28 156.19 65.88 153,19 93.20 1018.32 706.47 319.72 Pass 11427.72 8846.79 13075.00 8903.29 156.14 66.15 153.13 93.14 1027.40 707.15 328.12 Pass 11404.35 8847.35 13100.00 8903.26 156.09 66.42 153.07 93.08 1036.20 707.83 336.25 Pass 11380.95 8847.91 13125.00 8903.09 156.04 66.69 153.01 93.02 1044.91 708.86 344.24 Pass 11357.52 8848.48 13150.00 8902.78 156.00 66.96 152.93 92.94 1053.55 709.58 352.16 Pass Site: PB DS 11 Well: 11-38A Rule Assigned: Major Risk Wellpath: 11-38A V1 Inter-Site Error: 0.00 ft 11939.31 8834.47 12725.00 8893.08 157.49 58.50 152.68 92,69 1242.44 684.66 561.81 Pass 11914.66 8835.06 12750.00 8894.41 157.41 58.81 152.71 92.72 1246.55 685.43 565.22 Pass 11889.88 8835.66 12775.00 8895.85 157.34 59.12 152.74 92.75 1249.81 686.39 567.79 Pass 11865.07 8836.25 12800.00 8897.64 157.27 59.43 152.79 92.80 1252.70 687.18 569.99 Pass 11840.10 8836.86 12825.00 8898.23 157.20 59,75 152.79 92.80 1253.67 687.99 570.22 Pass 11815.13 8837.46 12850.00 8897.82 157.13 60.08 152.74 92.75 1253.02 688.84 568.78 Pass 11790.19 8838.06 12875,00 8897.20 157.06 60.41 152.69 92.70 1251.73 690.02 566.68 Pass 11765.21 8838.66 12900.00 8897.68 156.99 60.74 152.68 92.69 1251.09 690.89 565.25 Pass 11740.21 8839.26 12925.00 8898.89 156.92 61.07 152.71 92.72 1250.89 691.75 564.29 Pass 11715.23 8839.86 12950.00 8900.22 156.85 61.39 152.75 92.76 1250.70 692.60 563.34 Pass 11690.24 8840.46 12975.00 8901.71 156.78 61.72 152.79 92.80 1250.54 693.78 562.41 Pass 11665.29 8841.07 13000.00 8903.88 156.72 62.05 152.86 92.87 1250.64 694.65 561.76 Pass 11640.37 8841.67 13025.00 8906.27 156.65 62.38 152.94 92.95 1250.06 695.53 560.42 Pass 11615.44 8842.27 13050.00 8907.99 156.59 62.72 153.00 93.01 1248.58 696.43 558.16 Pass 11590.53 8842.87 13075.00 8908.98 156.53 63.06 153.02 93.03 1246.58 697.67 555.33 Pass 11565.67 8843.46 13100.00 8909.44 156.47 63.40 153.02 93.03 1244.00 698.60 551.91 Pass 11540.93 8844.06 13125.00 8910.04 156.41 63.74 153.03 93.04 1240.43 699.53 547.50 Pass 11516,36 8844,65 13150,00 8910.68 156.35 64,09 153.04 93,05 1235,79 700.47 542.03 Pass 11491.96 8845.24 13175.00 8910.31 156.29 64.43 153.01 93.02 1230.41 701.73 535.77 Pass 11467.56 8845.83 13200.00 8910.16 156.23 64.77 152.99 93.00 1224.97 702.69 529.45 Pass 11443.18 8846.41 13225.00 8910.18 156.18 65.12 152.98 92.99 1219.48 703.65 523.10 Pass . . ~ ~\ BP Amoco Anticollision Report Site: PB DS 11 Well: 11-38A Wellpath: 11-38A V1 Rule Assigned: Inter-Site Error: Major Risk 0.00 ft 11418.95 8847.00 13250.00 8910.02 156.12 65.46 152.96 92.97 1213.35 704.61 516.10 Pass 11395.09 8847.57 13275.00 8909.43 156.07 65.80 152.92 92.93 1205.91 705.89 507.76 Pass 11371.29 8848.15 13300.00 8908.29 156.03 66.15 152.86 92.87 1198.39 706.89 499.31 Pass 11347.11 8848.74 13325.00 8907.38 155.98 66.49 152.80 92.81 1191.26 708.05 491.26 Pass 11319.48 8849.91 13350.00 8907.19 155.94 66.78 152.65 92.76 1184.54 708.92 483.90 Pass 11295.23 8851.23 13375.00 8907.38 155.89 67.12 152.61 92.72 1178.50 709.97 476.96 Pass 11270.80 8852.55 13400.00 8907.99 155.84 67.47 152.59 92.70 1173.25 710.97 470.80 Pass 11246.22 8853.89 13425.00 8909.08 155.79 67.82 152.59 92.70 1168.64 711.95 465.30 Pass 11221.73 8855.21 13450.00 8910.36 155,74 68.16 152.60 92.71 1163.63 712.93 459.40 Pass 11197.09 8856.55 13475.00 8912.07 155.69 68.51 152.63 92.74 1159.50 714.23 454.40 Pass 11172.29 8857.90 13500.00 8913.97 155.64 68.86 152.66 92.77 1156.37 715.22 450.38 Pass 11147.42 8859.25 13525.00 8915.79 155.60 69.21 152.69 92.80 1153.97 716.21 447.09 Pass 11122.53 8860.60 13550.00 8916.79 155.55 69.55 152.68 92.79 1151.69 717.19 443.90 Pass 11097.61 8861.95 13575.00 8917.08 155.50 69.90 152.63 92.74 1149.87 718.49 441.17 Pass 11073.43 8863.17 13600.00 8916.93 155.46 70.24 152.56 92.67 1149.15 719.50 439.46 Pass 11050.00 8863.82 13625,00 8916.37 155.42 70.59 152.50 92,61 1149.45 720.58 438.74 Pass 10983.75 8863.78 13650,00 8915.91 155.22 69.74 150.38 92.59 1149.00 716.61 441.38 Pass 10958.76 8863.66 13675.00 8915.52 155.18 70.07 150.37 92.58 1148.11 717.56 439.60 Pass 10933,77 8863.54 13700.00 8915.04 155.14 70.41 150.35 92.56 1147.62 718.53 438.22 Pass 10908.78 8863.43 13725.00 8914.35 155.10 70.74 150.32 92,53 1147.58 719.48 437.28 Pass 10883.80 8863.31 13750.00 8913.42 155.07 71.07 150.28 92.49 1147.98 720.73 436.78 Pass 10858.83 8863.19 13775.00 8912.23 155.03 71.40 150.23 92.44 1148.82 721.68 436.71 Pass 10833.91 8863.07 13800.00 8910.79 154.99 71.73 150.16 92.37 1150.10 722.63 437.08 Pass 10809.02 8862.96 13825.00 8909.10 154.96 72.06 150.08 92.29 1151.81 723,58 437.89 Pass 10784.19 8862.84 13850.00 8907.17 154.93 72.39 149.98 92.19 1153.97 724.82 439.13 Pass 10763.37 8862.74 13871.00 8905.35 154.90 72.66 149.89 92.10 1156.11 723.79 440.52 Pass TREE: 7-1116" - 5M FMC L-80 WELLHEAD: 13-518" - 5M FMC Gen I Retro 13-318", 72#11t, N-80, BTC-M I 2715' 7" Liner Top at I 8538' I ~ 9-518", 47#/lt, RS-95 &N-80, BTC 18866' I y. {, fl Window Milled from Whipstock Top of Window at +/-9450' MD Bridge Plug set at +1-9468' MD Cement Plug to P&A Zone 1 Perfs Zone 1 Perfs 7", 29#11t, N-80, BTC-M I 10,194' I (P, I?tf 5-02A Proposed Completion 4-1/2" 'X' Landing Nipple with 3.813" seal bore. I 2200' .. .1" Cellar Elevation = 34.0' Nabors 2ES RKB = 64.0' 4-112" x 1-112" Camco 'MMG' Gas Lift Mandrels with handling pups installed above and below. L L 1 2 3 4 5 L ~ 4-112" 12.6# 13Cr-80, Vam ACE Tubing GAS LIFT MANDRELS fvÐ Size TBD 1-112" TBD 1-112" TBD 1-1/2" TBD 1-1/2" (ljlabove 1-112" packer) . .... . . 4-1/2" 'X' Landing Nipple with 3.813" seal bore. 9-518" Baker 'S-3' Production Packer crossed over to 4-1/2". 4-112" 'X' Landing Nipple with 3.813" seal bore. 4-112" 'XN' Landing Nipple with 3.813" seal bore and 3.75" No-Go. 4-112" WireLine Entry Guide spaced-out intD liner top. I +/-8275' I BAKER 7" x 9-5/8" Date 8127101 Tie Back Sleeve ZXP Liner Top Packer 'Flex Lock' Hydraulic Liner Hanger Crossover to 4-112" Vam Ace Valve Type RP Shear DV DV DV DV Horizontal Sidetrack into Zone 1 Sands Rev By WSI Comments PrDposed Completion ) ) 4-1/2" 12.6#/ft, 13Cr-80, Yam Ace 3. fJ'j Plug Back Depth I +/-11,963' I I +/-11,878' I PRUDHOE BAY UNIT WELL: 5-02A API NO: 50-029-20144-01 Alaska Drilling & Wells CHECK 1 STANDARD LEITER DEVELOPMENT DEVELOPME. /.. NT REDRILL V EXPLORATION INJECTION WELL INJECTION WELL REDRILL ~ ~, TRANSMIT AL LETTER CHECK LIST CIR CLE APPRO PRIA TE LEITERIP ARA GRAPHS TO BE INCLUDED IN TRANSNUTTALLETTER WELLNAME (}fa OS--Dz/I CHECK WHAT APPLIES ADD-ONS (OPTIONS) MULTI LATERAL (If api number last two (2) digits are between 60-69) PILOT HOLE (PH) ANNUL¿~ ~POSAL NO ANNULAR DISPOSAL <--J YES ANNULAR DISPOSAL THIS WELL "CLUE" The permit is for a new wellbore segment of existing well --'--' Permit No, . API No. . Production should continue to be reported as a function of the original API number stated above. In accordance with 20 MC 25.005(t), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 -70/80) from records, data and logs acquired for well (name on permit). Annular disposal has not been requested. . . Annular Disposal of drilling wastes will not be approved. . . Annular Disposal of drilling wastes will not be approved. . . DISPOSAL INTO OTHER Please note that an disposal of fluids generated.. . ANNULUS <--J YES + SP ACING EXCEPTION Templates are located m drive\jody\templates Enclosed is the approved application for permit to drill the above referenced well. The permit is approved .sùbject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Companv Name) will assume the liability of any protest to the spacing exception that may occur. ( i ~ ~ "--, H 198753 I DATE I 09/28/01 I CHECK NO. I 00198753 DATE INVOICE I CREDIT MEMO DESCRIPTION GROSS VENDOR DISCOUNT ALASKAOILA NET 00 092701 CK092701G PYMT ::OMMENTS: HANDLING IN5T: 100.00 100.00 Permit to Drill ~ee 5tH - Terri Hubble X4628 bS'o~f1 REG =IVED DEC 1 4 2001 Alaska Oil & Gas Cons. Commission Anc lorage THE A'ITACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. TOTAL ~ 100.00 100.00 BP EXPLORATION, (ALASKA) INC. P,O. BOX 196612 ANCHORAGE, ALASKA 99519.6612 FIRST NATIONAL BANK OF ASHLAND AN AFF1UATE OF NATIONAL CITY BANK CLEVELAND, OHIO No.H 198753 CONSOLIDATED COMMERCIAL ACCOUNT 56.389 412 00198753 PAY ONE HUNDRED & 00/100************************************* US DOLLAR DATE 09/28/01 I I AMOUNT $100. 001 To The ORDER Of ALASKA OIL AND GAS CONSERVATION COMMISSION 333 WEST 7TH AVENUE SUITE 100 ANCHORAGE NOT VALID AFTER 120 DAYS AK 99501 CJ oj) ~ . . .'.'. '.'~ \,,~J{3~¡, /L'. -~_.. III . 98 ? 5 :\ III I: 0 1. . 20 :\8 9 5 I: 008... 1. . 9111 (?3u WELL PERMIT CHECKLIST COMPANY ßt=X- WELL NAME D5""--e>Z/! PROGRAM: exp -;- dev -"./ redrll-.L serv - well bore seg _ann. disposal para ~eq - !FIELD&POOl cOYO~S() INITCLASS ~&V /Õ/é-- GEOLAREA 89/~ UNIT# ()//tp,Ç[:) ON/OFFSHORE [:;>n ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . /J /. . . . . . . . . . ~~ f' / / / / /. ,/ /} 2. Le~se numberappropriate.~ ~ß:¡;d'4,.:/:7~;) ./p-$!ç / ~ -.5v-r-j-¿¿~ I!:/:...£!h~ ~ -r'-í'r' ~.. .<:::>.:?VC-Ý7L~ ~-/.-e-J v~ ,,~ 3. Unique well name and number. .. . . . . . . . . . . . . . . . ./ N /tL?¿ c~¿?f? ':>ZL:; I. P. ~ ¿x';2~g2Ç. ..flÞ 4.Welllocatedinadefinedpool.................. N 5. Well located proper distance from drilling unit boundary. .. . N 6. Well located proper distance from other wells. . . . . . . . . . N 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . N 8. If deviated, is wellbóre plat included.. . . . . . . . . . . . . . . ) N 9. Operator only affected party.. . . . . . . . . . . . . . . . . . N 10. Operator has appropriate bond in force. . . . . . . . . . . . . N 11. Permit can be issued without conservation order. . . . . . . . N 12, Permit can,be issued without administrative approval.. . . . . N 13. Can permit be approved before 15-day wait.. . . . . . . . . . N 14. Conductor string provided .. . . . . . . .. . . . . . . . . . Y N NIl\- . ' /ý 15. Surface casing protects all known USDWs. . .. . . . . . .. ¡("-If ¥-1't ¿..dr, /( t: .¿'¡tJ:>-h~ ¿~t /j')j.. 16. CMT vol adequate to circulate on conductor & surf csg. . . . . Y N ¡.if A ' 17. CMT vol adequate to tie-in long string to surf csg. . . . . . . . ~N "'fA I t j-' 18. CM~ will co~er all known productive horizons. . . . . . . . . . N ..v .~ 0 ok, w.-£c. ïV'-.. rJ-f-R~ 1M) l.( ~<'c't-<&¡.,-- 19. Casing desIgns adequate for C, T, B & permafrost. . . . . . . . N 20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . N N Ar;¡ot s "z£;S- 21. Ifare-drill,hasa10-403forabandonmentbeenapproved... r;) N 's"'¡-'3'Si I'Z../!'/"'l 22. Adequate wellbore separation proposed.. . . . . . . . . . . . w N 23. If diverter required, does it meet regulations. . . . . . . . . . ~ N t-ilA 24. Drilling fluid program schematic & equip list adequate. . . . . N 25. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . N Ai- z..GS 26. BOPE press rating appropriate; test to 55 00 psig. IN' , 27. Choke manifold complies w/API RP-53 (May 84). . . . . . .. , N . 28. Work will occur without operation shutdbwn. . . . . . . . . . . ' 29. IspresenceofH25gasprobable................. ~ z..ë ¡JfrrA- NL.êt..K. C\-~ (,)<; 0$, ' 30. Permit can be issuedw/o.hydrogen sulfide measures. . . .. ylJrj D5-DZ- p,{£4¡;(/~. S((fJ1ot. ßz-~ ~ 3~.~~ / ().ff~1- toU( ¡/'-Z¥A 31. Da~a ~resented. on potential overpressure zones. . . . . . . ~ fllA..¿{1,>Ur<d 2-{; V(j711 1-!¿~ ~ §/-Z-<l/oo. 2l:> 32. SeIsmiC analysIs of shallow gas zones. . . . . . . . .~... A Y N . AP DATE 33. Seabed condition survey (If off-shore). . . . . . . . . . . . Y N ' ~ i'l,.'¡"'¡'ð! 34. Contact name/phone for weekly progress reports [expl ory only] Y N ANNULAR DISPOSAL35. With proper cementing records, this plan. (A) will contain waste in a suitable receiving zone; . . . . . . . (B) will not contaminate freshwater; or cause drilling waste. .. to surface; .. (C) will not impair mechanical integrity of the well used for disposal; Y N (0) will not damage producing formation or impair recovery from a Y N pool; and (E) will not circumvent 20 AAC 25.252 or 20 MC 25.412. Y N GEOL32Y: ENGINEE. R... ING: . UIC/Annular COMMISSION: ~þ~ ~ VJG~ WM 8t>s 2b +~U M ~'fÞ7 \;t/i!) \ JMH ()1\A,r;- rz-/'-xi61 APJ~R DATE I )'Jj) Iz. /</ .0 ENGINEERING A~p~ DAT~ ~ i2.{J'1{OI Ift~ \~/~\ GEOLOGY APPR DATE c 0 Z 0 -4 :E :xl ) -4 m Y N Y N Z -4 ::I: - en » :xl m » ) \.J C> (').~1"\-.) \0 t" ~\C;~S ---/ ~ Com m e ntsll ns tructi ons: c:\msoffice\wordian\diana\checklist (rev. 11/011100) .r---, ~ Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readabilITy of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. ,~ Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Thu Dec 19 14:45:16 2002 Reel Header Service name,.,.,....... .LISTPE Date.................... .02/12/19 Origin.................. .STS Reel Name............... . UNKNOWN Continuation Number..... .01 Previous Reel Name.......UNKNOWN Comments................ .STS LIS Tape Header Service name............ .LISTPE Date......,............. .02/12/19 Origin...................STS Tape Name............... . UNKNOWN Continuation Number..... .01 Previous Tape Name...... . UNKNOWN Comments, ,...............STS LIS Physical EOF Comment Record TAPE HEADER Prudhoe Bay MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 3 AK-MW-22007 S. HUIBAN R. BORDES # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: MSL 0) # WELL CASING RECORD Writing Library. Writing Library. 5-02A 500292014401 BP Exploration Sperry Sun 19-DEC-02 MWD RUN 4 AK-MW-22007 S. HUIBAN R. BORDES 32 11N 15E 2614 1109 25.12 25.12 35.00 ~: Scientific Technical Services Scientific Technical Services (Alaska) Inc, MWD RUN 5 AK-MW-22007 S. HUIBAN R. BORDES OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 6.000 9.000 9462.0 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING # REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS UNLESS OTHERWISE NOTED. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTHS (TVD). 3. MWD RUN 2 WAS DIRECTIONAL WITH WELL KICKED OFF FROM 5-02 ¿)JJ-aYI 1/'-15 7 .~ ~ WITH TOP OF WHIPSTOCK SET AT 9462' MD, 8440' TVD. 4. MWD RUN 3 WAS DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY PHASE 4(EWR4), STABILIZED LITHO-DENSITY (SLD), AND COMPENSATED THERMAL NEUTRON (CTN). 5. MWD RUNS 4-5 WERE DIRECTIONAL WITH DGR AND EWR4. 6. MWD DATA WAS BLOCK-SHIFTED IN ORDER TO TIE-IN TO PARENT WELL DATA, PER 3/11/2002 E-MAIL FROM D. SCHNORR (BP EXPLORATION) . HEADER DATA RETAIN DRILLER'S DEPTH REFERENCES. 7. MWD RUNS 3-5 REPRESENT WELL 5-02A WITH API # 50-029-20144-01. THIS WELL REACHED A TOTAL DEPTH (TD) OF 12035' MD I 8820' TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED (GEIGER-MUELLER TUBE DETECTORS) SEXP = SMOOTHED PHASE SHALLOW SPACING) SESP = SMOOTHED PHASE SPACING) SEMP = SMOOTHED PHASE SPACING) SEDP = SMOOTHED PHASE SPACING) SFXE = SMOOTHED FORMATION EXPOSURE TIME SHIFT DERIVED RESISTIVITY (EXTRA SHIFT DERIVED RESISTIVITY (SHALLOW SHIFT DERIVED RESISTIVITY (MEDIUM SHIFT DERIVED RESISTIVITY (DEEP SBD2 = SMOOTHED BULK DENSITY (LOW-COUNT BIN) SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN) SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW-COUNT BIN) TNPS = SMOOTHED THERMAL NEUTRON POROSITY (SANDSTONE MATRIX, FIXED HOLE SIZE) PARAMETERS USED IN NEUTRON I POROSITY LOG CALCULATIONS: HOLE SIZE: 6.0" MUD WEIGHT: 8.4 PPG MUD FILTRATE SALINITY: 1,000 PPM FORMATION WATER SALINITY: 50,000 FLUID DENSITY: 1.0 GICC MATRIX DENSITY: 2.65 GICC LITHOLOGY: SANDSTONE $ CHLORIDE PPM CHLORIDE File Header Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation.... ...02/12/19 Maximum Physical Record, .65535 File Type................LO Previous File Name...... .STSLIB.OOO Conunent Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted and DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE NCNT NPHI FCNT PEF GR 1 clipped curves; all bit runs merged. .5000 START DEPTH 9382.0 9382.0 9382.0 9390.5 9412.0 STOP DEPTH 10123.5 10123.5 10123.5 10138.5 11930.5 ~ .~. RPX RPS RPM RPD FET ROP RHOB DRHO $ 9419.0 9419.0 9419.0 9419.0 9432.5 9433.0 9438.5 9438.5 11937.5 11937.5 11937.5 11937.5 11937.5 12017.5 10138.5 10138.5 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH GR 9382.2 9400.0 12017.7 12035.5 $ # MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 3 9400.0 10228.0 MWD 4 10228.5 10940.0 MWD 5 10940.5 12035.5 $ # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing...... ............ ...60 .lIN Max frames per record.............Undefined Absent value...................,..-999 Depth Units....................... Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HR 4 1 68 28 8 RHOB MWD G/CC 4 1 68 32 9 DRHO MWD G/CC 4 1 68 36 10 PEF MWD BIE 4 1 68 40 11 NPHI MWD PU 4 1 68 44 12 NCNT MWD CP30 4 1 68 48 13 FCNT MWD CP30 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9382 12017.5 10699.8 5272 9382 12017.5 ROP MWD FT/H 0.85 827.61 83.3918 5170 9433 12017.5 GR MWD API 15.76 251.12 67.7388 5038 9412 11930.5 RPX MWD OHMM 1. 88 1550.7 61.5718 5038 9419 11937.5 RPS MWD OHMM 0.21 1550.84 70,9208 5038 9419 11937.5 RPM MWD OHMM 0.38 2000 148.603 5038 9419 11937.5 RPD MWD OHMM 0.29 2000 256.802 5038 9419 11937.5 FET MWD HR 0.5668 68.1101 4.07182 5011 9432.5 11937.5 RHOB MWD G/CC 1.648 3.352 2.29523 1401 9438.5 10138.5 DRHO MWD G/CC -0.798 1. 047 0.0407916 1401 9438.5 10138.5 PEF MWD BIE 1. 29 14.58 2.97842 1497 9390.5 10138.5 NPHI MWD PU 7.33 37.93 19.6237 1484 9382 10123.5 NCNT MWD CP30 17877.9 41935.8 29037.1 1484 9382 10123.5 FCNT MWD CP30 214.7 2192.8 765.436 1484 9382 10123.5 ~ ..-.., First Reading For Entire File...,..... .9382 Last Reading For Entire File.......... .12017.5 File Trailer Service name.............STSLIB.001 Service Sub Level Name... version Number.......... .1.0.0 Date of Generation...... .02/12/19 Maximum Physical Record. .65535 File Type................LO Next File Name...........STSLIB.002 Physical EOF File Header Service name............ .STSLIB.002 Service Sub Level Name... Version Number...........l.O.O Date of Generation...... .02/12/19 Maximum Physical Record. .65535 File Type................LO Previous File Name...... .STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE FCNT NCNT NPHI PEF GR RPD RPM RPS RPX FET ROP DRHO RHOB $ 2 header data for each bit run in separate files. 3 .5000 START DEPTH 9400.0 9400.0 9400.0 9408.5 9430.0 9437.0 9437.0 9437.0 9437.0 9450.5 9451. 0 9456.5 9456.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE CTN SLD DGR EWR4 $ # STOP DEPTH 10141.5 10141.5 10141.5 10156.5 10178.0 10185.0 10185.0 10185.0 10185.0 10185.0 10228.0 10156.5 10156.5 01-FEB-02 Insite 66.16 Memory 10228.0 9462.0 10228.0 31.4 83.9 BOTTOM) TOOL TYPE COMP THERMAL NEUTRON STABILIZED LITHO DEN DUAL GAMMA RAY ELECTROMAG. RESIS. 4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): TOOL NUMBER 065830 065830 065830 065830 6.000 9462.0 ~, ~ # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: Based Water 8.40 55.0 9.0 1000 8.2 2.200 1. 010 1.500 2.600 64.0 147.0 64.0 64.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): Sandstone 2.65 # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type.......... ,.......0 Data Specification Block Type.....O Logging Direction....... ......... . Down Optical log depth units...........Feet Data Reference Point..............Undefined Frame Spacing............. ....... .60 .lIN Max frames per record.............Undefined Absent value......................-999 Depth Units....................... Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 RPX MWD030 OHMM 4 1 68 12 4 RPS MWD030 OHMM 4 1 68 16 5 RPM MWD030 OHMM 4 1 68 20 6 RPD MWD030 OHMM 4 1 68 24 7 FET MWD030 HR 4 1 68 28 8 RHOB MWD030 G/CC 4 1 68 32 9 DRHO MWD030 G/CC 4 1 68 36 10 PEF MWD030 BIE 4 1 68 40 11 NPHI MWD030 PU 4 1 68 44 12 NCNT MWD030 CP30 4 1 68 48 13 FCNT MWD030 CP30 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9400 10228 9814 1657 9400 10228 ROP MWD030 FT/H 0.85 827.61 64.6633 1555 9451 10228 GR MWD030 API 15.76 251.12 43.8236 1497 9430 10178 RPX MWD030 OHMM 1. 88 1550.7 80.4138 1497 9437 10185 RPS MWD030 OHMM 0.21 1550.84 97.6511 1497 9437 10185 RPM MWD030 OHMM 0.38 2000 198.399 1497 9437 10185 RPD MWD030 OHMM 0.29 2000 437.679 1497 9437 10185 FET MWD030 HR 0.724 68.11 4.3243 1470 9450.5 10185 RHOB MWD030 G/CC 1.648 3.352 2.29523 1401 9456.5 10156.5 DRHO MWD030 G/CC -0.798 1.047 0.0407916 1401 9456.5 10156.5 PEF MWD030 BIE 1. 29 14.58 2.97842 1497 9408.5 10156.5 NPHI MWD030 PU 7.33 37.93 19.6237 1484 9400 10141.5 NCNT MWD030 CP30 17877.9 41935.8 29037.1 1484 9400 10141.5 FCNT MWD030 CP30 214.7 2192.8 765.436 1484 9400 10141.5 First Reading For Entire File......... .9400 Last Reading For Entire File.. ........ .10228 .~ ~, File Trailer Service name...".,..... .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/12/19 Maximum Physical Record..65535 File Type.,............. .LO Next File Name...........STSLIB.003 Physical EOF File Header Service name.............STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/12/19 Maximum Physical Record. .65535 File Type........,.,.... .LO Previous File Name.,.... .STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR RPD RPX RPM FET RPS ROP $ 3 header data for each bit run in separate files. 4 .5000 START DEPTH 10178.5 10185.5 10185.5 10185,5 10185.5 10185.5 10228.5 STOP DEPTH 10867.0 10877.5 10877.5 10877.5 10877.5 10877.5 10940.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 03-FEB-02 Insite 66.16 Memory 10940.0 10228.0 10940.0 84.8 93.0 # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 TOOL NUMBER 065830 065830 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 6.000 9462,0 # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM); FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: Based Water 8.50 54.0 9.0 1000 7.6 2.200 .870 64.0 172.4 ~ "-", MUD FILTRATE AT MT: MUD CAKE AT MT: 1.500 2.600 64.0 64.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type............ ......0 Data Specification Block Type,....O Logging Direction..........".... . Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing.....................60 .lIN Max frames per record............ .Undefined Absent value......................-999 Depth Units....................... Datum Specification Block sub-type...O Name Service Order units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD040 FT/H 4 1 68 4 2 GR MWD040 API 4 1 68 8 3 RPX MWD040 OHMM 4 1 68 12 4 RPS MWD040 OHMM 4 1 68 16 5 RPM MWD040 OHMM 4 1 68 20 6 RPD MWD040 OHMM 4 1 68 24 7 FET MWD040 HR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 10178.5 10940 10559.3 1524 10178.5 10940 ROP MWD040 FT/H 1.18 232.28 90.0723 1424 10228.5 10940 GR MWD040 API 42.87 196.01 87.2431 1378 10178.5 10867 RPX MWD040 OHMM 9.82 73.26 38.9271 1385 10185.5 10877.5 RPS MWD040 OHMM 10.71 70.73 38.0019 1385 10185.5 10877.5 RPM MWD040 OHMM 12.24 1687.05 55.8274 1385 10185.5 10877.5 RPD MWD040 OHMM 17 .26 1943.59 102.432 1385 10185,5 10877.5 FET MWD040 HR 0.5683 26.1266 3.0683 1385 10185.5 10877.5 First Reading For Entire File......... .10178.5 Last Reading For Entire File.......... .10940 File Trailer Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/12/19 Maximum Physical Record..65535 File Type................LO Next File Name...........STSLIB.004 Physical EOF File Header Service name.............STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/12/19 Maximum Physical Record. .65535 File Type................LO Previous File Name...... .STSLIB.003 ,~ Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR RPD RPM RPS RPX FET ROP $ 4 '--', header data for each bit run in separate files. 5 .5000 START DEPTH 10867.5 10878.0 10878.0 10878.0 10878.0 10878.0 10940.5 STOP DEPTH 11948.5 11955.5 11955.5 11955.5 11955.5 11955.5 12035.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units. ......... .Feet Data Reference Point..............Undefined Frame Spacing.....................60 .lIN Max frames per record............ . Undefined Absent value......................-999 06-FEB-02 Insite 66.37 Memory 12035.0 10940.0 12035.0 90.9 93.6 TOOL NUMBER 161907 161907 6.000 9462.0 Water 8.70 54.0 9.1 1000 7.0 Based 2.300 .950 1. 500 2.700 70.0 179.6 70.0 70.0 ~ ~, Depth Units....................... Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD050 FT/H 4 1 68 4 2 GR MWD050 API 4 1 68 8 3 RPX MWD050 OHMM 4 1 68 12 4 RPS MWD050 OHMM 4 1 68 16 5 RPM MWD050 OHMM 4 1 68 20 6 RPD MWD050 OHMM 4 1 68 24 7 FET MWD050 HR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 10867.5 12035.5 11451.5 2337 10867.5 12035.5 ROP MWD050 FT/H 0.85 212.58 92.342 2191 10940.5 12035.5 GR MWD050 API 27.61 167.88 71.8646 2163 10867.5 11948.5 RPX MWD050 OHMM 7.96 248.63 63.0359 2156 10878 11955.5 RPS MWD050 OHMM 9.18 426.24 73.5078 2156 10878 11955.5 RPM MWD050 OHMM 10.61 2000 173.627 2156 10878 11955.5 RPD MWD050 OHMM 15.97 2000 230.378 2156 10878 11955.5 FET MWD050 HR 0.567 51.595 4,54434 2156 10878 11955.5 First Reading For Entire File......". .10867.5 Last Reading For Entire File...........12035.5 File Trailer Service name......... ....STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .02/12/19 Maximum Physical Record. .65535 File Type................LO Next File Name...........STSLIB.005 Physical EOF Tape Trailer Service name,.... ....... .LISTPE Date.....................02/12/19 Origin...................STS Tape Name....,.......... . UNKNOWN Continuation Number..... .01 Next Tape Name.......... . UNKNOWN Comments.... .............STS LIS writing Library. Scientific Technical Services Reel Trailer Service name............ .LISTPE Date.....................02/12/19 Origin...................STS Reel Name............... . UNKNOWN Continuation Number..... .01 Next Reel Name.. .........UNKNOWN Comments...,..,......... .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File