Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
193-121
• • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 0 Post Office Box 196612 Anchorage, Alaska 99519 -6612 August 22, 2011 , RECEIVED Mr. Tom Maunder 1t1G 3 . 2011 Alaska Oil and Gas Conservation Commission 333 West 7 Avenue Malta Oil & Gsa Ce�+s• Anchorage, Alaska 99501 Anc#iera Subject: Corrosion Inhibitor Treatments of GPB P -Pad Dear Mr. Maunder, � ag Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB P- Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • r BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) P -Pad Date: 07/21/11 Corrosion Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date ft bbls ft na gal P - 1920920 500292228700 0.30 NA 0.30 NA 0.85 4/24/2010 P -02A 2000840 500292237601 0.30 NA 0.30 NA 4.25 4/25/2010 P -03A 1972280 500292217601 12.70 5.0 0.30 7/12/2010 2.55 8/5/2010 P -04 1910760 500292218000 1.80 NA 1.80 NA 15.30 4/25/2010 P -05A 2000510 500292254501 0.80 NA 0.80 NA 5.95 4/25/2010 P -06B 2051380 500292216602 11.30 3.0 1.00 7/12/2010 9.35 8/5/2010 P -07A 2011960 500292253501 0.50 NA 0.50 NA 1.70 4/24/2010 P -08A 2000850 500292237701 0.10 NA 0.10 NA 0.85 4/24/2010 P -09 1930580 500292236200 0.10 NA 0.10 NA 0.85 4/24/2010 P -10 1910520 500292215800 3.00 NA 3.00 NA 28.05 4/24/2010 P -11 1910290 500292214300 3.00 NA 3.00 NA 23.80 4/23/2010 P -12B 2001330 500292213602 0.30 NA 0.30 NA 0.85 4/23/2010 P -13 1901110 500292208000 0.30 NA 0.30 NA 1.70 4/23/2010 P -14 1910070 500292212900 7.50 NA 7.50 NA 56.10 7/21/2011 P -16 1901630 500292211300 4.30 NA 4.30 NA 37.40 4/22/2010 P -17 1901550 500292210500 8.00 NA 8.00 NA 89.30 4/28/2010 P -19 1901360 500292209400 0.80 NA 0.80 NA 5.10 4/21/2010 P -20B 2001590 500292208902 0.20 NA 0.20 NA 0.85 4/21/2010 P-21B 1970640 500292214802 0.40 NA 0.40 NA 4.30 4/21/2010 > P -22 1931210 500292239600 0.30 NA 0.30 NA 1.70 4/23/2010 P -23 1931120 500292239300 0.30 NA 0.30 NA 0.85 4/24/2010 P -24 1970540 500292275500 1.80 NA 1.80 NA 8.50 4/24/2010 P -25 1970260 500292274200 64.00 24.0 2.60 7/17/2011 23.80 7/20/2011 P -26 1962000 500292272700 2.60 NA 2.60 NA 22.10 4/25/2010 P -27 2040500 500292320300 1.00 NA 1.00 NA 6.80 4/25/2010 P -28 2100480 500292342500 1.20 NA 1.20 NA 10.20 8/7/2010 ....... STATE OF ALASKA ALAS!. OIL AND GAS CONSERVATION COMMISSIOf.. APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend __ Operation Shutdown __ Re-enter suspended well __ Alter casing __ Repair well Plugging __ Time extension __ Stimulate __ Change approved program , Pull tubing__ Vadance × , Perforate__ Other__ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development X Exploratory __ Stratigraphic Service 6. Datum elevation (DF or KB) KB = 85.63' feet 7. Unit or Property name Prudhoe Bay Unit 4. Location of well at surface 2584' NSL, 2228' EWL, SEC. 31, T11N, R13E At top of productive interval 9. 8. Well number P-22 (33-32-11-13) Permit number 93-121 10. APl number 50- 029-22396 2902' SNL, 3371' WEL, SEC. 32, T11N, R13E At effective depth 2984' SNL, 1609' WEL, SEC. 32, T11N, R13E At total depth 2980' SNL, 1616'WEL, SEC. 32, T11N, R13E 11. Field/Pool Prudhoe Off Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 12560' feet 9045' feet 12560' feet 9045' feet Plugs (measured) Junk (measured) Casing Length Size Structural -- Conductor '112' 20" Surface 2793' 10-3/4" Intermediate 11318' 7-5/8" Production -- Liner 9773 4-1/2" Perforation depth: measured Slotted Liner - 11188'- 12533' Cemented 280 cuft Arcticset 1728 cu ft CS IIIV431 cu 2048 cu ft Clas~ ;;~;; Uncemented true vedical subsea Tubing (size, grade, and measured depth) 4-1/2", 13CR80 to 11153' Packers and SSSV (type and measured depth) Packer @ 11164' SSSV @ 2114' ORIGINAL Measured depth 144 2825 11350 11153-12533 True vedical depth BKB 144 277O 8978 8969-8991 13. Attachments Description summary of proposal X Detailed operations program BOP sketch 14. Estimated date for commencing operation October 1996 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil X Gas Suspended Service 17. I hereby ce~fy that the fo,~2going is true and correct to the best of my knowledge. Signed ~/_~~~ ~ Title Supervisor Wat~rfloocl/Miscible Flood - ' ~ ' -- FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test ~ Location clearance __ Subsequent form required 10- I Appr°val I Mechanical Integrity Test__ Date SUBMIT IN TRIPLICATE Approved by order of the Commission Form 10-403 Rev 06~!;5/_88 Original Slg~!~u rl~vid W. Johnston Commissioner Approved Oop.~' Returnec) Well P-22 (33-32-11-13) Request for variance Well P-22 has been found to have tubing-to-annulus communication via the PBR. The well is capable of producing at 240 BOPD, 580 BWPD (70% WC), 0.3 MM formation gas, when lifting with 2.3 MM lift gas. Since the well has 4.5" tubing, it is unlikely to be able to flow on it's own. Since it is only three years old, the risk of a casing leak should be Iow. It is requested that a variance be granted to flow P-22 pending evaluation of a Sag lateral. Proposed schedule is as follows... 1. Perform a no flow test. If the well passes, return to production. 2. Evaluate RWO to pull tubing and drill Sag lateral. If RWO is uneconomic, evaluate cement packer repair. Target for RWO completion is spring breakup in 1997. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown __ Stimulate X Plugging__ Perforate__ Pull tubing__ Alter casing m Repair well m Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2584' NSL, 2228'EWL, SEC. 31, T11N, R13E 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KB = 85.63' feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number P-22 (33-32-11-13) At top of productive interval 2902' SNL, 3371' WEL, SEC. 32, T11N, R13E 'At effective depth 2984'SNL, 1609' WEL, SEC. 32, T11N, R13E At total depth 2980' SNL, 1616' WEL, SEC. 32, T11N, R13E 9. Permit number/approval number 93-121 / 10. APl number 50- 029-22396 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural -- Conductor 112' Surface 2793' Intermediate 11318' Production -- Liner 9773 Perforation depth: measured 12560' feet Plugs (measured) 9045' feet 12560' feet Junk (measured) 9045' feet Size Cemented 20" 280 cu ft Arcticset 10-3/4" 1728 cu ft CS IIIV431 7-5/8" 2048 cu ft Class "G" 4-1/2" Uncemented Slotted Liner - 11188'- 12533' Measured depth 144 2825 11350 11153-12533 True vertical depth BKB 144 2770 8978 8969-8991 true vertical subsea Tubing (size, grade, and measured depth) 4-1/2", 13CR80 to 11153' Packers and SSSV (type and measured depth) Packer @ 11164' SSSV @ 2114' 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 378 386 532 1960 328 371 570 2070 Tubing Pressure 249 279 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations __ Oil X Gas__ Suspended 17. I here~by c,~, ify that the/f'o~regoina is tr~e and correct to the best of my knowledge. S i ¢ n ed ./¢ ? ~.~¢' ' -~.~f/}i~~,..~..-,¢..-~. Title TechnicalAssistantlll Form 10-404 Rev 06/15/88 Service Dat e.~)%/~/,/~ ~.. SUBMIT IN DUPLICATE WELL P-22(33-32-11-13) __ STIM Operation 11/10/95 A Stimulation Wash Treatment was performed using the following fluids: SUMMARY: Run 1.75" nozzle on slick assembly. Tag up on debris at 11383 ft and jet through. Tag up hard at 11484 ft and unable to get through. POOH. Run 2. Run 3.625" tapered mill on Drillex 350HF motor. Tag debris at 11307 ft dn. Start circulating and got past OK. RIH milling with stall #1 at 11383', stalll#2 at 11464', stall #3 at 11470'. Continue milling down from 11482 to 11485'. PU wt check 24k (with o/pull to 25k) Continued RIH and stall#4 at 11484.1 where the coil became stuck. SI GL and waited for well to load up. Tried pulls to 30k but no movement. Decide to SI well and coil came free after a few minutes. PU to 11451' with weight steady at 23.5k. RIH slowly milling from 11451'. Stall #5 at 11479' and coil became stuck again. PU to 32k several times. SI well to load up but no movement seen. Cycled coil at a variety of pump rates, ie. high P/low pull over 2 hours. Cracked open wing to ensure that gas was minimsed. Slacked off to 12k and PU to 32 k and it eventually came free. POOH to change PDM, cut off 42' pipe and try out less agressive mill. Run 3. Run 3.55" bullnose carbide mill. Mill from first resistance at 11482 ft to 11488 ft. No obstruction between 11488 ft and 11494 ft. Mill from 11494 ft to 11500 ft. Unable to make further progress. Suspect dull mill. Pump Biozan pill and POOH. Run 4. Run 3.625" bullnose carbide mill. Tag at 11352' dn. Clean PU. POOH to 11350'. RIH slowly milling. Saw no resistance down to 11460'. Ream back and unable to pass 11377 ft. Able to run down, but unable to pull past 11377 ft. Pump Biozan pill. Unable to move up or down. Attempt to free coil by surging well, shutting in well, pumping nitrified water and Biozan. Pumped ball to disconnect. Good indication of shear. Unable to disconnect. Pull 32k 3 times. Increase pump rate and pull 32k. SD pumps and slackoff to neutral. Did 4 further pulls tro29k and no movement. Pumped 340 bbls SW down CT and Backside. Freeze protect top 2000' of coil with MeOH. Bled CTP to zero and monitored CTP and WHP for 1 hour 30mins and no pressure was seen. Made monitor cut in coil and it was on slight vacuum. Made full cut and rigged up slip connector and ball valve. Rig up Atlas to 1502. Free fall tool to 11085 ft (82 degrees deviation). Pump to bottom at lbpm. Differentaily stuck at coil fishing neck. Pull free and cut coil at 11305 ft. POOH. Cold roll connect the coil. Pull test to 28,000 lbs. POOH with coil. Blow down with Nitrogen. BBLS Fluids Pumped 4017 Seawater 66 Biozan 6 2 Methanol 4 1 4 5 TOTAL T~~I ~66~/£~/~o ~66~/6~/0~ ~66~/60/~ ~66~/60/~ ~66~/£0/~0 §6/6~/60 'e%e~ I 995II-008~ 9'!_a: IEI-~6 9~06-616L' S6/LZ/OZ O,T, / ~6/9~/OI'ZL~f~ ~MOO~- HD-GMH IEI-~6 ~0 %%ZM Z~I~G IEI-86 IIeM IenplA!pui 9109 iEI-g6 C! I:t I I--!... I ~ G S ~ !:!~.~1 r' E S WELL LOG TRANSMITTAL To: State of Alaska March 4, 1994 Alaska Oil and Gas Conservation Comm. Attn: Larry Grant 3001 Porcupine Drive Anchorage, Alaska 99501 MWD Formation Evaluation Logs - P-22 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this of this transmittal letter to the attention of.' Chen Wang, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG Format LIS Ta.~e with Verification Listing. Received: 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 ° (907) 563-3256 · Fax (907) 563-7252 A Baroid Company STATE OF ALASKA ALASKAOIL AND GAS CONSERVATION CO~v~MISSION WELL COMPLI=TION OR RI=COMP L£TION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number BP Exp/oration 93-121 3. Address 8. APl Number P. 0. Box 196612, Anchorage, A/aska 99519-6612 $o-029-22396 4. Location of well at surface ~.:: ................. 9. Unit or Lease Name 2584' NSL, 2228' EWL, SEC. 31, T11N, R13E ~, ..... - , ~ ~~, Prudhoe Bay Unit At Top Producing Interval !: ,~~/~.~ i~~"~J!! ~';~ ] 10. Well Number - ' ' 11. Field and Pool 2902' SNI-, 3371 WEL, SEC. 32, T11N, R13E 2980'SNL, 1616'WEL, SEC. 32, T11N, R13E 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Sedal No. KBE =86.8' J ADL 28288 12. Date Spudded 13. DateT.D. Reached 14. Date Comp., Susp. orAband. 115. Water Depth, if offshore 116. Nc. of Completions /oJ..~.~,/~_~I IN/A feet MSL One 9/24/93 10/12/93 17. TotalDepth(MD+TVD) 18. Plug Back Depth (MD+TVDi19. Directional Survey 120. Depth where SSSV set I1. Thickness of Permafrost 12560' MD/904,5' TVD 12560' MD/9045' TVD YES [] NC) [] 2114' feet MD 1900' (Approx.) 22. Type Electric or Other Logs Run MWD i23. CASING, LINER AND CEMENTING RECORD SE'I-FING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP Be'I-rOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 32' 112' 30" 280 cu ft Arcticset (Approx) 10-3/4" 45.5# NT-80 35' 2825' 13-1/2" 1728 cuft cs 111/431 cuft "G" 7-5/8" 29. 7# NT95HS 30' 11350' 9-7/8" 2048 cuft Class "G" 4-1/2" 12. 6~ 13CR80 11153' 12533' 6-3/4" Uncemented 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) Slotted Liner - 11188'-12533' MD 4-1/2", 13CR80 11153' 11164' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 27. PRODL~TION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) 10/26/93 I Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO TEST PERIOD I~ I Flow Tubing Casing Pressure CALCULATED..~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. RECEIVED NOV -9 199~ Alaska 0il & 8as Cons. Commission Anchorage .. Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 30. GEOLOGIC MARKERS I-,.,, ~MATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEFTH GOR, and time of each phase. Subsea Sag River 10 708' 8823' Shublik 10754' 8843' Top Sadlerochit 11065' 8917' RECEIVED NOV - 9 199,:3 Alaska 0il & (~as Cons. Commission Anchorage 31. LIST OF ATTACHMENTS 32. I hereby cedify that the foregoing is true and correct to the best of my knowledge Signed ~ ' Title Drilling EngineerSuoervisor Date /' INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: P-22 BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 09/24/93 09:00 SPUD: RELEASE: OPERATION: DRLG RIG: NABORS 28E WO/C RIG: NABORS 28E 09/24/93 ( 1) TD: 110 PB: 110 MIRU TURN KEY TO WELL. RIG MOVE TO P-22. MW: 8.5 Seawater 09/25/93 (2) TD: 1570 PB: 1570 09/26/93 (3) TD: 2880' ( 0) 09/27/93 ( 4) TD: 4090' (1210) 09/28/93 (5) TD: 5560' (1470) 09/29/93 (6) TD: 6850' (1290) DRILLING MW: 8.5 Seawater MOVE IN AND RIG UP NABORS 28E. NU DIVERTER SYSTEM. MIX SPUD MUD & PU BHA TO RIG FLOOR. FUNCTION TEST DIVERTER. LEVEL RIG. MAKE UP BHA & DRILL ICE FROM 57-110' DRILL SURFACE HOLE FROM 110-1570' CEMENT TOP JOB MW: 9.5 VIS: 54 DRILL F/ 1570-2360'. SHORT TRIP 5 STANDS. DRILL FROM 2360-2880' CIRC BOTTOMS UP. SHORT TRIP TP 800' CIRC SWEEP. TRIP OUT OF HOLE & LAY DOWN BHA. RIG UP & RUN 70 JOINTS OF 10 3/4" CASING. M/U HANGER AND LANDING JOINT. CIRC 2 BOTTOMS UP. UNABLE TO WASH PAST 2853'. LAY DOWN CASING JOINT %70. TEST CEMENT LINES. RIG UP AND PERFORM TOP JOB. DRILLING MW: 9.3 VIS: 39 ND DIVERTER. NU BOPE. TEST BOPE. PULL TEST PLUG & INSTALL WEAR BUSHING. MAKE UP & ORIENT BHA %2. TRIP IN HOLE & TAG CMT PLUGS @2713' ATTEMPT TO TEST 10 3/4" CASING. REPAIR STUFFING BOX ON DRAW WORKS & FLOOR PLATE. DRILL CEMENT & WIPER PLUGS FROM 2713' TO LANDING COLLAR @2744'_ CIRC BOTTOMS UP. LEAK OFF TEST. DRILL F/ 2890-3880' SHORT TRIP TO CASING SHOE @2825'. WORKED TIGHT SPOT @3550' DRILL F/ 3880-4090' DRLG. MW: 9.7 VIS: 43 DRLG F/ 4090'-4930' SHORT TRIP 11 STDS. DRLG F/ 4930'-5318' CIRC. POOH. RIH W/ RTTS. TEST CSG. OK. L/D RTTS. RIH. REAM TO BTM. DRLG F/ 5318'-5560' DRILLING MW: 9.8 VIS: 45 DRILL FROM 5560-6365'. SHORT TRIP OF 11 STANDS. DRILL FROM 6365-6778'. CIRC SWEEP. TRIP OUT OF HOLE. CHANGE MOTOR. LAY DOWN STABILISER AND ORIENT BHA. MAKE UP PDC BIT. CHECK WEAR BUSHING. TRIP IN TO SHOE. CUT AND SLIP DRILLING LINE. TRIP TO 6741' AND PRECAUTIONARY REAM TO BOTTOM. DRILL FROM 6778-6850' RECEIVED NOV -9 1993 Alaska Oil & Gas Cons. Commission Anchorage WELL ' P-22 OPERATION: RIG : NABORS 28E PAGE: 2 09/30/93 (7) TD: 8350' (1500) 10/01/93 (8) TD: 9209' ( 859) 10/02/93 ( 9) TD:10155' ( 946) DRLG. MW: 9.9 VIS: 45 DRLG F/ 6850'-7788' CIRC. SHORT TRIP TO 6761' DRLG F/ 7788'-8350' RIH. MW:10.0 VIS: 42 DRLG F/ 8350'-8835'. CIRC. SHORT TRIP TO 7777' DRLG F/ 8835'-9209' PUMP PRESS INCREASE. CBU. POOH. CHANGE MTR. RIH. DRLG. MW:10.0 VIS: 42 RIH. REAM TO BTM. DRLG F/ 9209'-10155' 10/03/93 (10) TD:10505'( 350) 10/04/93 (11) TD:10795' ( 290) TEST BOPE. MW:10.2 VIS: 42 DRLG F/ 10155'-10188'. SHORT TRIP 20 STDS. MAD PASS W/ LWD F/ 8224'-8417'. RIH. REAM TO BTM. DRLG F/ 10188'-10505' CIRC. POOH. TEST BOPE. DRLG. MW:10.2 VIS: 42 TEST BOPE. RIH. REAM TO BTM. DRLG F/ 10390'-10795' 10/05/93 (12) TD:10945' ( 150) 10/06/93 (13) TD:llll9' ( 174) 10/07/93 (14) TD:l1304' ( 185) 10/08/93 (15) TD:11368' ( 64) 10/09/93 (16) TD:11368' ( 0) 10/10/93 (17) TD:11368' ( 0) 10/11/93 (18) TD:11825' ( 457) DRLG. MW:10.2 VIS: 41 DRLG F/ 10795'-10824'. CBU. POOH. CHANGE BIT. RIH. CIRC. REAM 3 JTS TO BTM. DRLG F/ 10824'-10945' RIH. MW:10.2 VIS: 44 DRLG F/ 10945'-10950' CIRC. DRLG F/ 10950'-11092' CBU. DRLG F/ 11092'-11119'. CIRC. POOH. CHANGE BIT, BHA. RIH. DRLG. MW:10.2 VIS: 49 RIH. REAM F/ 10354'-11119'. DRLG F/ 11119'-11145' CBU. DRLG F/ 11145'-11304' RUN CSG. MW:10.3 VIS: 45 DRLG F/ 11304'-11368' CBU. SHORT TRIP 20 STDS. CIRC. POOH. L/D BHA, BIT. TEST BOPE. RIH W/ 7-5/8" CSG. P/U DP. MW:10.2 VIS: 45 RIH W/ 7-5/8" CSG. CIRC. PUMP 50 BBLS SPACER, 294 BBLS LEAD CMT, 72 BBLS TAIL CMT. BUMP PLUG W/ 2000 PSI. L/D LAND JT. TEST PACKOFF. TEST BOPE. RIH W. BIT, BHA. POOH. MW: 9.3 VIS: 67 RIH. CBU. TEST CSG. OK. DRLG FLOAT EQUIP, CMT TO 11368'. CIRC. DISP HOLE TO XANVIS. POOH TO FISN WASHOUT. DRLG. MW: 9.2 VIS: 54 CHANGE MTR. RIH. DISP HOLE W/ FLOPRO. RELOG F/ 11224'-11368' DRLG F/ 11368'-11825' RECEIVED NOV - 9 Alaska Oil & Gas Cons. Cor:nrnission Anchorage WELL : P-22 OPERATION: RIG : NABORS 28E PAGE: 3 10/12/93 (19) TD:12312' ( 487) 10/13/93 (20) TD:12560' ( 248) 10/14/93 (21) TD:12560' ( 0) 10/15/93 (22) TD:12560 PB: 9046 10/16/93 (23) TD:12560 PB: 9046 10/17/93 (24) TD:12560 PB: 9046 DRLG. DRLG F/ 11825'-12089' 12089'-12312'. MW: 9.2 VIS: 59 POOH. CHANGE BIT. RIH. DRLG F/ P/U HOLE OPENER. MW: 9.2 VIS: 60 POOH. CHANGE MTR. RIH. DRLG F/ 12296'-12560' TD WELL @# 22:30 HRS, 10/12/93. CIRC. POOH. RUN 4 1/2" LINER MW: 9.2 VIS: 60 RIH W/ HOLE OPENER. CUT DRLG LINE. REPLACE UPPER JAW ON IRON ROUGHNECK. RIH W/ HOLE OPENER. REAM F/ 11350-12560' CIRC BOTTOM UP CLEAN. SHORT TRIP T/ SHOE 11298' NO FILL. CIRC BOTTOMS UP SPOT60 BBL XANVISPILL. POH W/ SLM PUMP DRY JOB AT SHOE. POH W/ SLM. POH W/ SLM NO CORRECTION LAY DOWN BHA. RIG UP CASING TOOLS. RUN 4 1/2" SLOTTED LINER. LAYING DOWN DP MW: 8.5 Seawater RUN 4 1/2" SLOTTED LINER. PICK UP 2 1/16 HYDRIL CS TUBING. MAKE UP TIW SS HIGH ANGLE HANGER. CIRC TUBING & HANGER. RIH W/ LINER. DROP DRILL PIPE DART SET PACKER. DISPLACE 100 BBL XANVIS SPACER. PULL UP 70 FT. PULL OUT OF LINER LAYING DOWN DP. CIRC & TOP OF LINER @11153' CIRC TOP OF LINER CLEAN W/ SEAWATER. POH LAYING DOWN DP. LAND TBG. MW: 8.5 Seawater POOH. L/D DP. RIH W/ 4-1/2" 13 CR TBG COMP ASS'Y. P/U SSSV, CNTRL LINES. RIH W/ TBG. STAB OVER RISER. REV CIRC. SPACE OUT TBG. M/U HGR. LAND TBG. RIG RELEASED. MW: 8.5 Seawater N/D BOPE. N/U TREE. TEST TREE. OK. TEST TBG, ANNULUS. OK. U-TUBE DIESEL. INJECT 160 BBLS DIESEL DN P-23 ANNULUS. SECURE WELL. RIG RELEASED @ 20:30 HRS, 10/16/93. SIGNATURE: (drilling superintendent) DATE: RECEIVED Alaska Oil & Gas Cons. Commission Anchorage SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PRUDHOE BAY DRILLING PBU/P-22 /j //~ TRUE SUB-SEA COURS COURSE MEASD VERTICAL VERTICAL INCLN DIRECTION DEPTH DEPTH DEPTH DG MN DEGREES DATE OF SURVEY: 101393 PAGE MWD SURVEY JOB NUMBER: AK-MW-30072 KELLY BUSHING ELEV. = 88.60 FT. OPERATOR: BP EXPLORATION DLS TOTAL RECTANGULAR COORDINATES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 0 .00 -88.60 0 0 N .00 E 154 154.00 65.40 0 12 S 7.10 E 247 247.00 158.40 0 0 N .00 E 337 337.00 248.40 0 6 N 58.50 W 427 427.00 338.40 0 12 N 73.90 W .00 .00N .00E .00 .13 .27S .03E .04 .21 .43S .05E .07 .11 .39S .01W .00 .12 .30S .23W -.22 517 517.00 428.40 0 6 N 57.70 W 607 607.00 518.40 0 18 N 11.70 W 697 697.00 608.40 0 12 N 10.60 W 785 785.00 696.40 0 18 N 25.60 E 880 880.00 791.40 0 12 N 9.00 W .12 _ .22S .45W -.44 .27 .06N .56W -.56 .11 .44N .64W -.66 .21 .80N .57W -.60 .19 1.19N .49W -.54 976 975.99 887.39 0 6 S 87.70 E 1072 1071.99 983.39 0 12 S 86.20 E 1167 1166.99 1078.39 0 12 S 44.90 E 1262 1261.99 1173.39 0 18 S 49.50 E 1358 1357.99 1269.39 0 6 S 28.20 W .25 1.35N .43W -.49 .11 1.34N .18W -.24 .15 1.21N .10E .05 .11 .93N .41E .37 .31 .69N .56E .53 1453 1452.99 1364.39 0 24 S 45.00 W 1549 1548.99 1460.39 0 42 S 74.10 W 1644 1643.98 1555.38 0 42 S 70.50 W 1740 1739.97 1651.37 0 36 S 60.60 W 1836 1835.97 1747.37 0 30 S 56.10 W .32 .38N .29E .42 .01S .51W .05 .37S 1.62W .16 .81S 2.61W .11 1.29S 3.39W .27 -.51 -1.60 -2.57 -3.33 1930 1929.97 1841.37 0 24 S 43.60 W 2026 2025.96 1937.36 0 24 S 35.40 W 2121 2120.96 2032.36 0 12 S 8.40 W 2217 2216.96 2128.36 0 18 S 15.30 E 2312 2311.96 2223.36 0 30 S 19.20 E .15 1.76S 3.96W .06 2.27S 4.39W .25 2.71S 4.60W .15 3.11S 4.56W .21 3.75S 4.36W -3.88 -4.28 -4.48 -4.42 -4.19 2407 2406.95 2318.35 0 36 S 23.30 E 2503 2502.95 2414.35 0 54 S 21.00 E 2598 2597.93 2509.33 1 6 S 24.30 E 2693 2692.91 2604.31 1 23 S 27.70 E 2800 2799.88 2711.28 1 23 S 1.50 W .11 4.59S 4.03W .31 5.76S 3.56W .22 7.29S 2.91W .33 9.15S 2.00W .66 11.61S 1.43W -3.82 -3.30 -2.59 -1.59 -.91 2860 2859.85 2771.25 1 36 S 2.70 E 2956 2955.81 2867.21 1 47 S 41.20 E 3051 3050.70 2962.10 3 30 S 70.40 E 3147 3146.40 3057.80 5 24 S 80.00 E 3242 3240.89 3152.29 6 24 S 81.20 E · 38 13.18S 1.41W -. 82 1.18 15.65S . 35W . 34 2.23 17.75S 3.37E 4.15 2.12 19.51S 10.57E 11.43 1.06 21.10S 20.21E 21.12 ECEIVED NOV -9 ;995 Alaska Oil & Gas Cons. Commission Anchorage SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/P-22 500292239600 NORTH SLOPE COMPUTATION DATE: 10/13/93 DATE OF SURVEY: 101393 MWD SURVEY JOB NUMBER: AK-MW-30072 KELLY BUSHING ELEV. = 88.60 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG M/~ COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 3338 3336.19 3247.59 3433 3430.22 3341.62 3528 3523.89 3435.29 3624 3618.10 3529.50 3718 3709.77 3621.17 7 24 N 88.40 E 1.66 21.75S 31.68E 8 53 N 89.50 E 1.59 21.51S 45.14E 10 18 N 88.90 E 1.48 21.29S 60.98E 11 48 N 89.10 E 1.56 20.97S 79.38E 13 41 S 87.50 E 2.17 21.30S 100.11E 32.61 46.05 61.86 80.23 100.95 3814 3802.75 3714.15 3908 3893.35 3804.75 4004 3985.44 3896.84 4099 4075.77 3987.17 4195 4166.15 4077.55 15 6 S 89.70 E 1.57 21.86S 123.97E 15 48 N 87.90 E 1.01 21.46S 149.00E 17 0 N 89.50 E 1.34 20.86S 176.09E 19 0 S 88.80 E 2.18 21.06S 205.44E 20 23 S 87.50 E 1.53 22.12S 237.78E 124.81 149.80 176.84 206.17 238.53 4290 4254.98 4166.38 4386 4344.02 4255.42 4481 4431.26 4342.66 4577 4518.69 4430.09 4673 4604.88 4516.28 21 6 S 87.50 E .74 23.58S 271.41E 22 47 S 89.50 E 1.93 24.50S 307.27E 23 47 S 89.30 E 1.06 24.89S 344.84E 25 0 S 89.70 E 1.26 25.24S 384.50E 27 12 S 89.50 E 2.29 25.54S 426.72E 272.18 308.05 345.61 385.24 427.43 4768 4688.71 4600.11 4864 4771.92 4683.32 4959 4852.87 4764.27 5054 4932.40 4843.80 5150 5011.18 4922.58 28 53 N 88.40 E 2.07 25.08S 471.38E 30 53 N 88.10 E 2.09 23.62S 519.21E 32 12 N 87.70 E 1.39 21.79S 568.88E 34 5 N 88.40 E 2.04 20.03S 620.79E 35 35 N 88.60 E 1.57 18.60S 675.62E 472.03 519.74 569.28 621.07 675.78 5246 5088.69 5000.09 5340 5163.46 507.4.86 5435 5237.75 5149.15 5530 5310.57 5221.97 5626 5382.58 5293.98 36 42 N 88.80 E 1.15 17.32S 732.24E 37 54 N 88.80 E 1.28 16.12S 789.18E 39 12 N 88.20 E 1.42 14.57S 848.36E 40 42 N 88.40 E 1.58 12.76S 909.33E 42 5 N 88.20 E 1.46 10.88S 972.78E 732.28 789.12 848.17 909.00 972.31 5722 5453.41 5364.81 5817 5522.61 5434.01 5912 5590.71 5502.11 6008 5658.77 5570.17 6103 5725.95 5637.35 42 47 N 89.10 E .97 9.35S 1037.56E 43 42 N 90.00 E 1.15 8.85S 1102.64E 44 42 S 87.90 E 1.87 10.07S 1168.85E 45 0 S 86.70 E .94 13.26S 1236.47E 45 0 S 86.70 E .00 17.13S 1303.54E 1036.95 1101.95 1168.15 1235.85 1303.02 6198 5793.35 5704.75 6294 5861.35 5772.75 6389 5928.18 5839.58 6484 5994.82 5906.22 6580 6062.41 5973.81 44 35 S 86.80 E .43 20.92S 1370.37E 45 12 S 87.50 E .81 24.29S 1438.05E 45 24 S 87.50 E .21 27.24S 1505.51E 45 30 S 87.40 E .13 30.25S 1573.14E 45 0 S 86.80 E .68 33.70S 1641.23E 1369.95 1437.71 1505.24 1572.94 1641.11 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/P-22 500292239600 NORTH SLOPE COMPUTATION DATE: 10/13/93 TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN 6675 6130.10 6041.50 6770 6198.04 6109.44 6866 6266.27 6177.67 6961 6333.74 6245.14 7057 6401.86 6313.26 DATE OF SURVEY: 101393 MWD SURVEY JOB NUMBER: AK-MW-30072 KELLY BUSHING ELEV. = 88.60 FT. OPERATOR: BP EXPLORATION COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST 44 5 S 85.30 E 1.46 38.28S 1707.71E 44 35 S 86.50 E 1.03 43.03S 1773.95E 44 47 S 87.70 E .90 46.44S 1841.38E 44 42 S 87.50 E .18 49.24S 1908.21E 44 54 S 86.50 E .76 52.78S 1975.75E VERT. SECT. 1707.73 1774.11 1841.63 1908.51 1976.15 7152 6469.33 6380.73 7247 6537.03 6448.43 7343 6605.68 6517.08 7435 6671.01 6582.41 7531 6738.54 6649.94 44 35 S 86.70 E .35 56.75S 2042.52E 44 30 S 86.80 E .13 60.53S 2109.06E 44 12 S 86.70 E .32 64.33S 2176.06E 45 17 S 86.70 E 1.20 68.06S 2240.71E 45 17 S 87.20 E .37 71.69S 2308.85E 2043.03 2109.67 2176.77 2241.53 2309.76 7627 6806.06 6717.46 7722 6873.12 6784.52 7818 6941.36 6852.76 7913 7008.59 6919.99 8007 7074.53 6985.93 45 17 S 86.30 E .67 75.56S 2376.98E 44 54 S 86.50 E .45 79.78S 2444.14E 44 30 S 85.40 E .91 84.55S 2511.49E 45 24 S 88.10 E 2.22 88.34S 2578.48E 45 30 S 88.10 E .11 90.56S 2645.43E 2377.99 2445.27 2512.77 2579.86 2646.85 8103 7142.23 7053.63 8198 7209.76 7121.16 8293 7277.40 7188.80 8389 7345.82 7257.22 8484 7412.99 7324.39 44 47 S 87.50 E .85 93.17S 2713.44E 44 35 S 88.60 E .84 95.45S 2780.22E 44 35 S 87.70 E .67 97.60S 2846.89E 44 30 S 87.40 E .24 100.48S 2914.17E 45 30 S 89.00 E 1.59 102.58S 2981.31E 2714.90 2781.72 2848.42 2915.76 2982.92 8579 7479.46 7390.86 8675 7546.62 7458.02 8770 7613.09 7524.49 8863 7677.93 7589.33 8959 7744.49 7655.89 45 42 S 88.90 E .22 103.83S 3049.17E 45 30 S 88.70 E .26 105.26S 3117.74E 45 42 S 89.10 E .37 106.56S 3185.60E 45 54 S 89.40 E .32 107.44S 3252.27E 46 17 S 88.90 E .56 108.46S 3321.44E 3050.78 3119.35 3187.20 3253.84 3322.98 9053 7809.85 7721.25 9143 7872.76 7784.16 9247 7945.27 7856.67 9340 8009.34 7920.74 9428 8069.52 7980.92 45 35 S 88.40 E .84 110.05S 3388.98E 45 42 S 88.60 E .19 111.74S 3453.31E 45 54 S 86.20 E 1.67 115.12S 3527.78E 47 0 S 86.40 E 1.19 119.47S 3595.04E 46 42 S 88.00 E 1.37 122.61S 3659.16E 3390.53 3454.87 3529.41 3596.80 3661.00 9530 8139.15 8050.55 9624 8203.26 8114.66 9719 8269.07 8180.47 9808 8331.17 8242.57 9907 8399.88 8311.28 47 12 S 88.40 E .57 124.95S 3733.66E 46 47 S 87.30 E .96 127.53S 3802.35E 45 30 S 84.50 E 2.53 132.40S 3870.66E 46 0 S 85.60 E 1.05 137.90S 3934.17E 46 5 S 84.00 E 1.17 144.36S 4005.15E 3735.53 3804.27 3872.73 3936.42 4007.61 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/P-22 500292239600 NORTH SLOPE COMPUTATION DATE: 10/13/93 TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN DATE OF SURVEY: 101393 MWD SURVEY JOB NUMBER: AK-MW-30072 KELLY BUSHING ELEV. = 88.60 FT. OPERATOR: BP EXPLORATION COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 10003 8466.69 8378.09 10096 8531.82 8443.22 10188 8596.01 8507.41 10282 8659.33 8570.73 10375 8719.67 8631.07 45 42 S 86.90 E 2.21 149.84S 4073.85E 45 24 S 87.10 E .36 153.31S 4140.14E 46 5 S 87.80 E .94 156.24S 4205.98E 49 12 S 86.30 E 3.50 159.84S 4275.34E 49 54 S 83.70 E 2.26 166.01S 4345.82E 4076.48 4142.87 4208.77 4278.22 4348.91 10444 8763.88 8675.28 10527 8814.97 8726.37 10622 8867.73 8779.13 10652 8882.89 8794.29 10715 8912.22 8823.62 50 24 S 85.40 E 2.03 171.04S 4398.55E 53 35 S 86.40 E 3.97 175.70S 4463.78E 58 54 S 85.90 E 5.60 181.01S 4542.56E 60 24 S 83.60 E 8.29 183.39S 4568.33E 64 5 S 85.90 E 6.70 188.47S 4623.84E 4401.81 4467.18 4546.12 4571.97 4627.65 10746 8925.27 8836.67 10760 8930.87 8842.27 10810 8949.63 8861.03 10841 8960.11 8871.51 10873 8969.86 8881.26 66 5 S 86.60 E 6.77 190.31S 4651.89E 66 48 S 86.50 E 5.04 191.08S 4664.70E 69 5 S 85.60 E 4.89 194.27S 4710.92E 71 24 S 86.70 E 8.14 196.23S 4740.03E 73 5 S 86.40 E 5.39 198.06S 4770.45E 4655.76 4668.59 4714.91 4744.07 4774.54 10905 8979.03 8890.43 10937 8987.82 8899.22 10969 8995.75 8907.15 10998 9001.91 8913.31 11030 9007.85 8919.25 73 35 S 86.60 E 1.67 199.93S 4801.05E 74 30 S 87.10 E 3.19 201.62S 4831.77E 76 48 S 87.30 E 7.21 203.14S 4862.73E 78 41 S 87.40 E 6.56 204.45S 4891.03E 79 54 S 86.70 E 4.32 206.07S 4922.43E 4805.19 4835.96 4866.95 4895.29 4926.73 11063 9013.18 8924.58 11087 9016.48 8927.88 11116 9019.89 8931.29 11149 9023.33 8934.74 11181 9026.24 8937.64 81 30 S 87.00 E 4.93 207.86S 4954.94E 82 41 S 87.50 E 5.41 209.00S 4978.69E 83 48 S 87.00 E 4.16 210.38S 5007.45E 84 11 S 87.00 E 1.21 212.10S 5040.23E 85 24 S 87.00 E 3.75 213.76S 5072.05E 4959.29 4983.06 5011.86 5044.67 5076.54 11213 9028.47 8939.87 11243 9030.01 8941.41 11254 9030.44 8941.84 11275 9031.14 8942.54 11287 9031.49 8942.89 86 35 S 87.00 E 3.75 215.43S 5103.92E 87 30 S 87.00 E 3.00 217.00S 5133.84E 88 0 S 87.20 E 4.90 217.56S 5144.82E 88 11 S 87.00 E 1.35 218.62S 5165.78E 88 30 S 87.20 E 3.01 219.23S 5177.76E 5108.46 5138.42 5149.41 5170.40 5182.39 11307 9031.92 8943.32 11350 9032.22 8943.62 11382 9031.72 8943.12 11414 9030.66 8942.06 11445 9029.44 8940.84 89 0 S 87.00 E 2.69 220.24S 5197.73E 90 11 S 87.00 E 2.79 222.49S 5240.67E 91 35 S 87.00 E 4.38 224.16S 5272.62E 92 11 S 87.00 E 1.88 225.84S 5304.56E 92 18 S 87.00 E .33 227.46S 5335.49E 5202.38 5245.38 5277.37 5309.35 5340.33 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/P-22 500292239600 NORTH SLOPE COMPUTATION DATE: 10/13/9 TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN DATE OF SURVEY: 101393 MWD SURVEY JOB NUMBER: AK-MW-30072 KELLY BUSHING ELEV. = 88.60 FT. OPERATOR: BP EXPLORATION COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 11477 9028.46 8939.86 91 11 S 87.00 E 3.44 229.13S 5367.43E 11509 9027.71 8939.11 91 30 S 87.00 E .94 230.81S 5399.38E 11542 9026.93 8938.33 91 11 S 87.00 E .91 232.53S 5432.32E 11573 9026.69 8938.09 89 41 S 87.00 E 4.84 234.16S 5463.28E 11605 9026.94 8938.34 89 24 S 87.00 E .94 235.83S 5495.23E 5372.31 5404.30 5437.29 5468.29 5500.28 11637 9027.36 8938.76 89 5 S 87.00 E .94 237.50S 5527.18E 11667 9028.28 8939.68 87 24 S 87.00 E 5.67 239.07S 5557.13E 11700 9029.77 8941.17 87 24 S 87.00 E .00 240.80S 5590.05E 11732 9031.17 8942.57 87 35 S 87.00 E .62 242.47S 5621.97E 11764 9032.51 8943.91 87 35 S 87.00 E .00 244.15S 5653.90E 5532.28 5562.26 5595.23 5627.19 5659.17 11795 9033.86 8945.26 87 24 S 87.00 E .64 245.77S 5684.83E 11827 9035.28 8946.68 87 30 S 87.00 E .32 247.44S 5716.75E 11858 9036.61 8948.01 87 35 S 87.00 E .33 249.06S 5747.68E 11890 9037.67 8949.07 88 35 S 87.00 E 3.12 250.73S 5779.62E 11922 9038.31 8949.71 89 5 S 87.00 E 1.56 252.41S 5811.57E 5690.14 5722.10 5753.07 5785.05 5817.04 11954 9038.79 8950.19 89 11 S 87.00 E .32 254.08S 5843.52E 11987 9039.25 8950.65 89 11 S 87.00 E .06 255.81S 5876.47E 12019 9039.70 8951.10 89 11 S 87.00 E .06 257.48S 5908.43E 12047 9040.09 8951.49 89 11 S 87.00 E .07 258.95S 5936.39E 12083 9040.68 8952.08 88 54 S 87.00 E .83 260.83S 5972.33E 5849.04 5882.04 5914.03 5942.03 5978.02 12115 9041.33 8952.73 88 48 S 87.00 E .31 262.51S 6004.28E 12147 9041.94 8953.34 89 0 S 87.00 E .62 264.18S 6036.23E 12178 9042.51 8953.91 88 54 S 87.00 E .32 265.80S 6067.18E 12211 9043.17 8954.57 88 48 S 87.00 E .30 267.53S 6100.13E 12242 9043.87 8955.27 88 35 S 87.00 E .64 269.15S 6131.08E 6010.02 6042.01 6073.00 6105.99 6136.99 12266 9044.50 8955.90 88 24 S 87.00 E .84 270.41S 6155.04E 12297 9044.99 8956.39 89 48 S 87.00 E 4.52 272.03S 6185.99E 12328 9045.02 8956.42 90 5 S 87.00 E .97 273.65S 6216.95E 12362 9044.93 8956.33 90 11 S 87.00 E .30 275.43S 6250.90E 12395 9044.81 8956.21 90 11 S 87.00 E .06 277.16S 6283.86E 6160.98 6191.97 6222.97 6256.97 6289.97 12425 9044.73 8956.13 90 5 S 87.00 E .34 278.73S 6313.82E 12454 9044.71 8956.11 90 0 S 87.00 E .35 280.25S 6342.78E 12486 9044.79 8956.19 89 41 S 87.00 E .94 281.92S 6374.73E 12517 9045.04 8956.44 89 24 S 87.00 E .97 283.54S 6405.69E 12560 9045.60 8957.00 89 5 S 87.00 E .70 285.80S 6448.63E 6319.96 6348.96 6380.96 6411.96 6454.96 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 6454.96 FEET AT SOUTH 87 DEG. 27 MIN. EAST AT MD = 12560 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 92.54 DEG. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/P-22 500292239600 NORTH SLOPE COMPUTATION DATE: 10/13/93 DATE OF SURVEY: 101393 JOB NUMBER: AK-MW-30072 KELLY BUSHING ELEV. = 88.60 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST 0 .00 -88.60 .00 N .00 E 1000 999.99 911.39 1.35 N .39 W 2000 1999.96 1911.36 2.12 S 4.28 W 3000 2999.79 2911.19 16.69 S .56 E 4000 3981.61 3893.01 20.87 S 174.92 .E MD-TVD VERTICAL DIFFERENCE CORRECTION .00 .01 .01 .04 .03 .21 .17 18.39 18.18 5000 4887.57 4798.97 20.92 S 590.71 E 6000 5653.11 5564.51 12.94 S 1230.83 E 7000 6361.6 6272.86 50.44 S 1935.61 E 8000 7069.63 6981.02 90.40 S 2640.44 E 9000 7772.82 7684.22 109.03 S 3351.07 E 112.43 94.04 346.89 234.45 638.54 291.65 930.38 291.84 1227.18 296.80 10000 8464.59 8375.99 149.72 S 4071.70 E 11000 9002.30 8913.70 204.54 S 4892.99 E 12000 9039.43 8950.83 256.49 S 5889.45 E 12560 9045.60 8957.00 285.80 S 6448.63 E 1535.41 308.23 1997.70 462.30 2960.57 962.87 3514.40 553.83 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/P-22 500292239600 NORTH SLOPE COMPUTATION DATE: 10/13/93 DATE OF SURVEY: 101393 JOB NUMBER: AK-MW-30072 KELLY BUSHING ELEV. = 88.60 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH 0 .00 L88.60 88 88.60 .00 188 188.60 100.00 288 288.60 200.00 388 388.60 300.00 TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION .00 N .00 E .0O .04 S .00 E .00 .00 .39 S .05 E .00 .00 .42 S .05 E .00 .00 .34 S .ll.W .00 .00 488 488.60 400.00 588 588.60 500.00 688 688.60 600.00 788 788.60 700.00 888 888.60 800.00 .24 S .41 W .04 S .54 W .41 N .63 W .82 N .56 W .22 N .49 W .00 .00 .00 .00 .00 .00 .00 .00 .01 .00 988 988.60 900.00 1088 1088.60 1000.00 1188 1188.60 1100.00 1288 1288.60 1200.00 1388 1388.60 1300.00 .35 N .41 W .01 .00 .33 N .12 W .01 .00 .15 N .16 E .01 .00 .84 N .52 E .01 .00 .64 N .54 E .01 .00 1488 1488.60 1400.00 1588 1588.60 1500.00 1688 1688.60 1600.00 1788 1788.60 1700.00 1888 1888.60 1800.00 1988 1988.60 190'0.00 2088 2088.60 2000.00 2188 2188.60 2100.00 2288 2288.60 2200.00 2388 2388.60 2300.00 .21 N .11 E .15 S .98 W .55 S 2.12 W .06 S 3.04 W .55 S 3.76 W 2.06 S 4.23 W 2.59 S 4.59 W 2.97 S 4.60 W 3.55 S 4.43 W 4.42 S 4.10 W .01 .00 .02 .01 .02 .01 .03 .01 .03 .00 .04 .00 .04 .00 .04 .00 .04 .00 .05 .00 2488 2488.60 2400.00 2588 2588.60 2500.00 2688 2688.60 2600.00 2788 2788.60 2700.00 2888 2888.60 2800.00 5.55 S 3.64 W 7.12 S 2.99 W 9.05 S 2.05 W 11.33 S 1.42 W 13.98 S 1.37 W .05 .01 .07 .01 · 09 .02 .12 .03 · 16 .04 2988 2988.60 2900.00 3088 3088.60 3000.00 3189 3188.60 3100.00 3290 3288.60 3200.00 3390 3388.60 3300.00 16 18 20 21 21 .43 S .33 E .52 S 5.56 E .21 S 14.55 E .82 S 25.59 E .57 S 38.69 E .20 .05 .37 .17 .79 .42 1.42 .62 2.28 .86 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/P-22 500292239600 NORTH SLOPE COMPUTATION DATE: 10/13/93 DATE OF SURVEY: 101393 JOB NUMBER: AK-MW-30072 KELLY BUSHING ELEV. = 88.60 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 3492 3488.60 3400.00 3593 3588.60 3500.00 3696 3688.60 3600.00 3799 3788.60 3700.00 3903 3888.60 3800.00 21.41 S 54.57 E 21.06 S 73.21 E 21.08 S 94.95 E 21.84 S 120.15 E 21.51 S 147.66 _E 3.54 1.26 5.26 1.73 7.61 2.35 10.75 3.14 14.47 3.72 4007 3988.60 3900.00 4112 4088.60 4000.00 4218 4188.60 4100.00 4326 4288.60 4200.00 4434 4388.60 4300.00 20.85 S 177.06 E 21.15 S 209.86 E 22.48 S 246.12 E 24.14 S 284.38 E 24.67 S 326.10 E 18.71 4.24 23.97 5.26 30.35 6.39 37.44 7.08 45.80 8.36 4543 4488.60 4400.00 4654 4588.60 4500.00 4767 4688.60 4600.00 4883 4788.60 4700.00 5001 4888.60 4800.00 25.16 S 370.47 E 25.46 S 418.36 E 25.09 S 471.32 E 23.29 S 529.18 E 20.90 S 591.39 E 55.20 9.41 66.10 10.89 79.27 13.18 94.84 15.56 112.64 17.80 5122 4988.60 4900.00 5245 5088.60 5000.00 5371 5188.60 5100.00 5501 5288.60 5200.00 5634 5388.60 5300.00 5770 5488.60 5400.00 5909 5588.60 5500.00 6050 5688.60 5600.00 6191 5788.60 5700.00 6332 5888.60 5800.00 19.00 S 659.46 E 17.32 S 732.17 E 15.71 S 808.75 E 13.29 S 890.44 E 10.71 S 978.22 E 8.90 S 1070.25 E 9.99 S 1166.76 E 14.98 S 1266.26 E 20.66 S 1365.69 E 25.49 S 1465.46 E 133.63 21.00 157.29 23.65 183.26 25.97 212.42 29.16 245.51 33.10 281.43 35.92 320.43 39.00 361.59 41.16 t-=Ot=©t~F 402.72 444.07 41.34 6475 5988.60 5900.00 6617 6088.60 6000.00 6756 6188.60 6100.00 6897 6288.60 6200.00 7038 6388.60 6300.00 29.96 S 1566.82 E 35.16 S 1667.39 E 42.46 S 1764.66 E 47.33 S 1863.54 E 51.97 S 1962.56 E 486.52 42.46 528.44 41.92 568.15 39.70 608.86 40.72 649.68 40.81 7179 6488.60 6400.00 7319 6588.60 6500.00 7460 6688.60 6600.00 7602 6788.60 6700.00 7743 6888.60 6800.00 57.84 S 2061.49 E 63.38 S 2159.48 E 69.08 S 2258.46 E 74.42 S 2359.37 E 80.73 S 2459.54 E 690.47 40.79 730.58 40.11 771.41 40.83 813.58 42.17 855.25 41.68 SPERRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PBU/P-22 500292239600 NORTH SLOPE COMPUTATION DATE: 10/13/93 DATE OF SURVEY: 101393 JOB NUMBER: AK-MW-30072 KELLY BUSHING ELEV. = 88.60 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 7884 6988.60 6900.00 87.67 S 2558.22 E 895.93 8027 7088.60 7000.00 91.04 S 2659.74 E 938.47 8168 7188.60 7100.00 94.94 S 2759.36 E 979.68 8308 7288.60 7200.00 98.04 S 2857.92 E 1020.13 8449 7388.60 7300.00 102.15 S 2956.49_E 1060.60 40.68 42.54 41.21 40.44 40.48 8592 7488.60 7400.00 104.01 S 3058.54 E 1103.49 8734 7588.60 7500.00 106.17 S 3160.51 E 1146.33 8878 7688.60 7600.00 107.55 S 3263.28 E 1189.74 9022 7788.60 7700.00 109.45 S 3367.29 E 1234.03 9165 7888.60 7800.00 112.14 S 3469.54 E 1277.08 42.89 42.84 43.40 44.29 43.05 9309 7988.60 7900.00 118.07 S 3572.84 E 1320.99 9455 8088.60 8000.00 123.32 S 3679.39 E 1367.21 9602 8188.60 8100.00 126.79 S 3786.76 E 1413.98 9746 8288.60 8200.00 134.31 S 3890.44 E 1458.26 9890 8388.60 8300.00 143.14 S 3993.49 E 1502.13 43.91 46.23 46.77 44.28 43.87 10034 8488.60 8400.00 151.05 S 4096.27 E 1545.77 10177 8588.60 8500.00 155.94 S 4198.28 E 1588.71 10326 8688.60 8600.00 162.17 S 4309.24 E 1638.25 10483 8788.60 8700.00 173.37 S 4429.19 E 1694.84 10663 8888.60 8800.00 184.47 S 4578.53 E 1775.14 43.64 42.94 49.54 56.59 80.29 10939 8988.60 8900.00 201.77 S 4834.56 E 1951.31 12560 9045.60 8957.00 285.80 S 6448.63 E 3514.40 176.17 1563.10 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Atto: Larry Grant 3001 Porcupine Drive Anchorage, Alaska 99501 MWD Formation Evaluation Logs - P-22 AK-IVlW-30072 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this of this transmittal letter to the attention of: Paul Radzinski, Sperry-Sun Drilling Services, 5631 Silvemdo Way, #G, Anchorage, AK 99518 2" x 5" MD Gamma Ray Logs: 1 Blueline ~'~- Gfk 1 Folded Sepia q2.oo/-. 12_~ o' KS-tz 2" x 5" TVD Gamma Ray Logs: 1 Blueline ~owoV,~ _ c,, g, 1 Folded Sepia Received: ( A -Cc 5631 Siiverado Way, Suite G · Anchorage, Alaska99518 · (907)563~3256 · Fax (907)563-7252 A Baroid Company MEMORANDUM TO: David Johns~ Chairman THRU: Blair Wondzell-~ P.I. Supervisor ~'/'~ FROM: Lou Grimaldi Petroleum Inspector STATE OF ALASKA ALAS~ OIL AND GAS CONSER VA TION COMMISSION DATE: October 11, 1993 FILE NO: QJRJJKAB. doc PHONE NO: 279-1433 SUBJECT: Rig\BOPE inspection Nabor's 28-E BPX well # P-22 Prudhoe Bay field PTD 93-121 MondaY, October 11, 1993 1 made a Rig\BOPE inspection on Nabor's rig # 28-E, drilling BPX well # P-22 in the Prudhoe Bay field. I found the rig to be in good shape with all equipment I observed to have the appearance of regular maintenance and to be in compliance. Laveme Linder (Nabor's toolpusher) maintains his rig well. The area surrounding the rig was free of trash and provided good access. SUMMARY; I found no problem's with Nabor's rig 28-E during my Rig\BOPE inspection. Attachment:QJRJJKAB.XLS STATE OF ALASKA ALASKA OI,- AND GAS CONSERVATION C JMMISSION RIG I BPS INSPECTION REPORT OPERATION: Drilling ....... X Workover Drig Contr. Nabor's Alaska Operaton BPX . .. Location: S~n 31 T. 11N Cmpl. UIC Well Name: Rig No. 22'-Er ' ~ REP,' Rep. James Carlile R. '1'3E' M. 'iJ ......... DATE: 10\11\93 . . PTD~ 93,121 Laveme Under Rig Ph.# 659-4863 B.O.P. press preventer iPipe rams Blind rams St. ack anchored line size tums targeted ( chke & kilt Ln.) valves (chke & kill Ln.) Manual valves (chke & kilt Ln.) Connections (Flgd, VVhd, Clamped Drflk,,g spool Nipple Flow m~ lines fire CLOSING UN pressure level pressure gauges Sufficient valves Regulator bypass valves (actuators) Blind rams handle cover control panel control panel Firewal] power source (backup) ~ConcrdJon hoses, ect. MUD SYSTEM floats installed Mud gas separator Degasser Separator bypass Gas sensors ~Choke line connections tank RIG FLOOR :Kelly cocks (upper, lower, IBOP) :Floor valves (dart, bari, ect.) Kelly & floor valve wrenches Drillers console (flow monitor, indicator, pit level indicators, gauges) sheet up-to-date Gas detection monitors & methane) Hydraulic choke panel Choke manifold MISC. EQUIPMENT FtareNent line targeted (downstream choke lines) Reserve pit tankage protective equip, avail. Ddllsite Supervisors Trained For Procedures H2.S probes REMARKS: 'Fii d6 j s: ............... Date of Last Rig / BPS Inspection Resulting Non-Compliance Items: Non-Compliance not corrected & Reason: Date Corrections W'di Be Completed: BOP Test & Results Properly Entered O~ D~ily Record? Date of Last BOP Test i Kilt Sheet Current? c - OperJRig c - Database c - Trip Rpt F~te c-Inspector AC)GCC REP: OPERATOR REP: FI-022 (Rev. 3/93) Louis R Grimaldi QJRJJKAB.XLS MEMORANDUM' .. ~. TO: David Johnst.~ri' ' Chairma~ · , THRU: Blair Wondzell ~7~ P.I. Supervisor '~/"~ FROM: Lou Grimaldi Petroleum Inspector : '? STATE OFALASKA AL,4SKA OIL AND GAS CONSERVATION COMMISSION DATE: Ociober 1'1, 1993 -. '. :~ "' "FILE NO: GJRJJKAB.doc 't PHONE NO: 279-1433 SUBJECT: Diveder system on Nabor's 28-E " c4'~ ~'1%:'"' Monday, Octob.e. r 11, 1993_ I discussed with Laverne Linder (Nabor's toolpusher) the problem , with the manual valve that the rig is using on it's vent line while on diverter..At my suggestion this valve will be moved inside the sub-base and be mounted downstream of the off-driller's side vent line valve and have a hydraulic actuator attached to it, the line's will be connected to the driller's side vent line valve. These two valves will operate in the reverse of each other. ] Manual valve old system new sS.'sle m MEMORANDUIV, TO: David Johnston, Chairman Stat~ of Alaska Alaska Oil and Gas Conservation Commission DATE: September 28, 1993 THRU: Blair Wondzell, ~ FILE NO: P. I. Supervisor FROM: Jerry Herring, ¥:r SUBJECT: Petroleum Inspector eirkixac.doc Diverter Test - Nabors 28E BPX, PBU P-22 Prudhoe Bay Field ,. PTD # 93-121 Friday, September 24, 1993: I traveled to BPX's P-pad and witnessed the function test of Nabors 28E diverter system. The Diverter Systems Inspection Report is attached for reference. The function test began at 11:00 a.m. and went well. I found the rig to be in good condition. All components functioned properly. There were two separate 10" knife valves off of the 20" hydrill diverter. The controls were such that only the starboard 10" knife valve would open when the hydrill closed. The port side 10" knife valve was operated using the kill line HCR controls. Depending on prevailing wind conditions, a manual valve was located outside on the starboard line to direct the flow to the port side. The diverter system can be defeated if the manual block valve is shut-in and the kill line HCR valve is not opened. I discussed my concerns with tool pusher, Mike Downey. He stated this is the same diverter system which 28E has employed for years. Mike also stated that Nabors is considering going 'to an installation similar to the exploration wells drilled last winter where a single straight 16" line is installed where possible. Doug Amos met with Mike Downey and company man James Carlile to further discuss their diverter layout. Summary: A successful diverter test was witnessed on Nabors 28E, drilling well P-22 for BPX, Prudhoe Bay Unit. Attachment ---', STATE OF ALASKA ...... ALASKA O,.. AND GAS CONSERVATION COMh,,.~SION Diverter Systems Inspection Report .. Drlg Contractor: NABORS Operator: B.P. EXPLORATION Well Name: PBU P-22 Location: Sec. 31 T. 11N R. Date: 9/24/93 Operation: Development X Exploratory: Rig No. 28E PTD # 93-121 Rig Ph. # 659-4863 ,, Oper. Rep.: JAMES CARLILE Rig Rep.: MIKE DOWNEY ,, 13E Merdian UM MISC. INSPECTIONS: ACCUMULATOR SYSTEM: Location Gen.: OK Well Sign: OK Systems Pressure: 3000 psig Housekeeping: OK (Gen.) Drlg. Rig: OK Pressure After Closure: 1600 psig Reserve Pit: N/A Flare Pit: N/A 200 psi Attained After Closure: min. 18 sec. Systems Pressure Attained: 1 min. 6 sec. Nitrogen Bottles: 8 BOTTLES ' 950 A~jE.' DIVERTER SYSTEM INSPECTION: Diverter Size: 20 in. Divert Valve(s) Full Opening: YES Valve(s) Auto & Simultaneous: Right, Side Only Vent Line(s) Size: Vent Line(s) Length: Line(s) Bifurcated: Line(s) Down Wind: Line(s) Anchored: Tums Targeted / Long Radius: 10 in. 140 ft. YES YES YES ' ;YES 1 psig MUD SYSTEM INSPECTION: Light Alarm Trip Tank: YES NO Mud Pits: YES YES Flow Monitor: YES YES GAS DETECTORS: Light Alarm Methane OK OK Hydrogen Sulfide: N/A N/A ., . Old R~serve Pit a'~l~ere Wellhead Houses I 140' .El , ,~ 140' atm~pphere I I ~Manual Knife VaJve 4°'! ! 40' 20" Annular t/Vith 2 - 10 3/4" Full Opening Knib Valves Not To Scale Prevailing W'md Direction NE & SW Non Compliance Items 0. Repair Items Within Day (s) And contact the Inspector @ 659-3607 Remarks: ,,Right side knife valve opens simuitaneoush/as h~.dril doses. Left side knife valve is operated separatel~ bY. kill line H,.CR control signal. There is a manual block valve on bhe fight side line required to be shutin for wind direction changes. The diverter s)rstem can be defeated if the manual block valve is shut-in and the kill line, HCR valve Is, no,t o ,l~ened. Distribution odg.- Well File c- OperlRep c- Database c - Trip Rpt File c - Inspector AOGCC REP.: ._ . Jrr~- ¢' ./-f~,~,f OPERATOR REP.: Mike Downey EIRKIXAC.XLS FI-022 (Rev. 7/93) MEMORANDUM Stat~ ~f Alaska Alaska Oil and Gas Conservation Commission TO: David Johnst, pn, DATE: Chairmar~ THRU: Blair Wondzell, ~ FILE NO: P. I. Supervisor FROM: Jerry Herring, ~[r SUBJECT: Petroleum Inspector September 28, 1993 eirkixac.doc Diverter Test- Nabors 28E BPX, PBU P-22 Prudhoe Bay Field PTD # 93-121 Friday, September 24, 1993: I traveled to BPX's P-pad and witnessed the function test of Nabors 28E diverter system. The Diverter Systems Inspection Report is attached for reference. The function test began at 11:00 a.m. and went well. I found the rig to be in good condition. All components functioned properly. There were two separate 10" knife valves off of the 20" hydrill diverter. The controls were such that only the starboard 10" knife valve would open when the hydrill closed. The port side 10" knife valve was operated using the kill line HCR controls. Depending on prevailing wind conditions, a manual valve was located outside on the starboard line to direct the flow to the port side. The diverter system can be defeated if the manual block valve is shut-in and the kill line HCR valve is not opened. I discussed my concerns with tool pusher, Mike Downey. He stated this is the same diverter system which 28E has employed for years. Mike also stated that Nabors is considering going to an installation similar to the exploration wells drilled last winter where a single straight 16" line is installed where possible. Doug Amos met with Mike Downey and company man James Carlile to further discuss their diverter layout. Summary: A successful diverter test was witnessed on Nabors 28E, drilling well P-22 for BPX, Prudhoe Bay Unit. Attachment STATE OF ALASKA ALASKA ~iL AND GAS CONSERVATION COI~,,dlSSION Diverter Systems Inspection Report Operation: Drtg Contractor: NABORS Rig No. Operator: B.P. EXPLORATION Oper. Rep.: Well Name: PBU P-22 Rig Rep.: Location: Sec. 31 T. 11N R. 13E Date: 9~24~93 ,, Development X Exploratory: 28E PTD # 93-121 Rig Ph. # 659-4863 JAMES CARLILE MIKE DOWNEY ,, , Merdian UM MISC. INSPECTIONS: Location Gen.: OK Well Sign: OK Housekeeping: OK (Gen.) Drlg. Rig: OK Reserve Pit: NtA Flare Pit: N/A DIVERTER SYSTEM INSPECTION: Diverter Size: 20 in. Divert Valve(s) Full Opening: YES Valve(s) Auto & Simultaneous: Ri~lht Side Only Vent Une(s) Size: 10 in. Vent Line(s) Length: 140 ft. Line(s) Bifurcated: YES Une(s) Down Wind: YES : Line(s) Anchored: YES Tums Targeted / Long Radius: YES ACCUMULATOR SYSTEM: Systems Pressure: Pressure After Closure: 200 psi Attained After Closure: Systems Pressure Attained: Nitrogen Bottles: 3000 , psig 1600 psig ' min. ~8 sec. 1 min. 6 sec. 8 BOTTLES 1950 AVE. , psig MUD SYSTEM INSPECTION: Light Alarm Trip Tank: YES NO Mud Pits: YES YES Flow Monitor: YES YES · GAS DETECTORS: Light Alarm Methane OK OK Hydrogen Sulfide: NIA N/A Old Reserve Pit 140' ere I re Manual Knife Valve 40' 40' j~ Wells Wellhead Houses J Left Side Knife Valve~ ife Valve ~ Wellhead Houses Not To Scale ~/lain Rig Module 20" Annular With 2 - 10 3/4" Full Opening Knife Valves Prevailing W'md Direction NE & SW Non Compliance Items 0 Repair Items W~hin Day (s) And contact the Inspector @ 659-3607 Remarks: Right,side knife valve opens simultaneously as hyddl closes. Left side knife valve is operated separately/by kill line HCR control signal. There is a manual block valve on ~he dght side line required to be shutin for wind direction changes. The diverter system can be defeated if the manual block valve is shut4n and the kill line HCR valve is not opened. Distribution orig. - Well File AOGCC REP,: c- Oper/Rep c- Database OPERATOR REP.: c - Trip Rpt Fde EIRKtXAC.XLS c- Insl3ector Mike Downey FI-022. (Rev. 7/93) MEMORANDb,d State o, Alaska Alaska Oil and Gas Conservation Commission TO: David Johnst~, Chairman DATE: September 27, 1993 THRU: Blair Wondzell, P. I. Supervisor FROM: Doug Amos~ SUBJECT: Petroleum Inspector FILE NO: qirhi I ac.doc Rig BPS/Inspection Nabors 28E BPX PBU P-22 Prudhoe Oil Pool PDT No. 93-121 Monday September 27, 1993: i traveled this date to BPX PBU P-22 well to conduct a Rig/BPS Inspection on Nabors Rig No. 28E. As the attached AOGCC Rig/BPS Inspection Report indicates/I found no non compliance items during the inspection. ! was asl~by Nabors representative Mike Downey to make some recommendation for changing the rigs Diverter System from the present two line configuration to a single 16" straight line. After our walk through inspection of the rig substructure, I recommended that the drillers console and mouse hole be moved to the opposite side of the rig floor. With the current arrangement, the mouse hole is directly in the substructure exit path of a single line configuration. The only other option with the mouse hole in it's current location is the use of a 45° turn directly off the csg spool or a targeted tee approximately 4 ft. downstream of the csg spool, in my opiniOn, from past history~the, se two arrangements are undesirable from a safety stand point due to[vent line wash-out, immediately down stream of the 45° turn or targeted tee. IN SUMMARY, conducted a Rig/BPS Inspection at BPX PBU P-22 well on Nabors Rig 28E, no failures. Attachments QIRHI1AC.XLS STATE OF ALASKA ALASKA ,. AND GAS CONSERVATION CC., RIG ! BPS INSPECTION REPORT fISSION OPER~Ti0N: ' Dritting '" X ....... Work~er ' ' 'C° 'r~pi: .... Uid .... DATE: 9/~7/93 .... Well Name PBU P-22 PTD~ 93-121 . Drig Contractor:, , NABOR'S Rig~ ....... 28-E Rep. MIKE DOWNEY Operator: ,, ' BPx' ' Rep., ., ,". ..... J,.AMES CARLILE ....... Ri~tPh.# ' 659-4'863" Location: Se'ctior~ ...... 31 T,' 1'1 N'. R. 13E M. U .... ,, , ,. , ' ! ....... j ' ' i~~~ ~~ ~' ..... "i'i~J'i'~'" ""'i'li''i'''.''Ti'j .......... i'l'"i, (A,) B.O:P. STACK YES NO NIA {C.} MU, D SYSTEM' YES NO NIA I I i I .... I I I i ii i i Wellhead fig wkg Pr,ess X 2~ ',Pit level floats installed X' 2 S~ack wkg pre.ss, . X ' 30 iFiow rate sens'or ...... X ,,] 3 Annular,pre,,venter ,, X ....... 31 ~Uud gas. separat,or , , L X~, , , 4 Pipe ,rams........ X 32 Degasser ..... x 5 Blind rams X- 33 Separator b~,pass, ........ X 6 Sta(~k anchored ..... X .... 34 Gas sensors X ' '7 Chke/kili line size .... X 35 Choke line c(~nnections " X ..... s NI tur~ targ,et~d ! c'hke &kili Ln.)' .. x. ... 36 '[..rip t-~nk ..... X ..... 9 HCR valves (Chke & kill Ln.) .... X .... ; 10 Manual valves (chke & I~li Ln.) X . {D.).RIG .FLOOR YES NO NIA 11. ic°nnect~0nS,,(Figd, Whd,,'ciamPed . X ' ' 37 Keiiy, ,c?cks (uPper, lower, lBoP) X ' 12 Drilling spool X .... 38 Floor valves (dart, ball, ect.) X 13 FlowNippl~ "." .. i '.'.. '" ' ..X '.' . . 39 K~ily&ri0'orvalvewrenches X 14 Flow monitor X 40 D~le'rs Co~sole (,flow mOnit°r, X 15 Control'lines fire protected .... X - . f~w'rate indicator, pit !evel · {B.) CLOSING UNIT YES NO NIA 41 Kilt sheet .u,.p-to-date X 16 W(~king pre~sure ........ X ' " "42 Gas detection monitors X 17 Fluid level "'X ' ~L(i'I'2S & methane) "' 18 Operating pressure , ~' ..... X '.' 43 !l-Jydraulic, ,chOke panelI 19 Pressure gauges X 44 Choke. manifold ' X 20 SU~cier~t vai~ ' ' x " ' :.; IN COMPMANCE. :.:: 21 Regulator bypass X ,(E.) MISC. E,Q, UIPMENT YES NO NtA 22 4-way ~aives i~cfl.~ators) ..... X .... 45 Fla~v~t I~'~ ......... ~ ..... 23 Blind"rams handle coVe~ .... X ..... 46 All'tums targeted " )~ "' 24 Dr~er COntrOl palnei' ,' , ' X (dow~,'stream, ,ch~ke,line~i ,' ...... 25 iRemote control panel "X ' ' ' 47 ReserVe Pit tankage X 26 FireWall .......... X ' ~ 48 PersormeJ protecth/e e~'ui~'.'avail. ~( ' 27 ~Ni~0g~n po'~'er-s ,ource' (b.'ac.~.).," .. ' 'x' 49 Nl'Drillsite SUp;~wisors yrained ' ' X ' ' ' 28 Cond, ifion (I,eaks, hoses, ,ect.) ,, X . For Procedures ........ , 50 H2S probes X 51 Righo~ekeepi~g '' .i ' X REMARKS: RECORDS: Date of Last Rig / BPS Inspection 6/24/93 Date of Last BOP Test Resulting Non-Compliance Items: Non-Compliance not corrected & ReasOn: Date Corrections Will Be Completed: BOP Test & Results Properly Entered On Daily Record? , )'es 9/27/93 none Kill Sheet Current? yes Distribution: orig - Well File c - Oper.lRig c - Database c - Trip Rpt File c- Inspector AOGCC REP OPERATOR REP: Dou~/ Amos QIRHllAC.XLS (Rev. 12/92) STATE OF ALASKA ALAoKA OIL AND GAS CONSERVATION COMMISSf~JN APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend __ Alter casing __ Repair well __ Change approved program x Operation Shutdown Re-enter suspended well -~' Plugging Time extension Stimulate Pull tubing Variance Perforate Other "- 6. Datum elevation (DF or KB) 2. Name of Operator BP Exploration 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 2584' NSL, 2228' EWL, SEC. 31, T11N, R13E At top of productive interval 2910' SNL, 2589' WEL, SEC. 32, T11N, R13E At effective depth N/A At total depth 2924' SNL, 1601' WEL, SEC. 32, T11N, R13E 5. Type of Well: Development X KBE = 86' fe~et Exploratory Stratigraphic__ 7. Unit or Property name Service__ Prudhoe Bay Unit 8. Well number P-22 (33-32-11-13) 9. Permit number 93-121 10. APl number 50- 029-22396 11. Field/Pool Prudhoe Bay Field/Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural Conductor Surface Intermediate Production Liner Perforation depth: measured true vertical Tubing (size, grade, and measured depth) Packers and SSSV (type and measured depth) Size feet Plugs (measured) feet feet Junk (measured) feet Cemented Measured depth True vertical depth REEEiVED S E P - 8 1993 Alaska 0il & Gas Cons. Commission Anchorage 13. Attachments Description summary of proposal x Detailed operations program __ BOP sketch 14. Estimated date for commencing operation 10/5/93 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil X Gas Suspended Service 17. I hereby ced~/y'~t the forego~g is true and correct to the best of my knowledge. Signed ~"~~~~r--'/ //,~,~ ~ / Title Drilling Engineer Supervisor FOR COMMISSION USE ONLY Date Conditions of approval: Notify Commission so representative may witness Plug integrity __ BOP Test__ Location clearance __ Mechanical Integrity Test__ Subsequent form required 10- Approved by order of the Commission Form 10-403 Rev 06/15/88 Original Signed By David W. Johncton lAppr°val N°'?_I~ .- ~ ~ ,:\pprovbd Cop)' Returned Commissioner Date ~'t/~ o///F ~' SUBMIT IN TRIPLICATE P-21 Change of approved drilling program Change Surface hole size from 16" to 13-1/2". Surface casing 10-3/4", 45.5#, NT-80 BTC ~.~, ~_..! .~ ~..:_~ ,~ ~o, ._~ .2~,, ~ ~ Surface cement vol. 900 sx CS 111/355 sx Class "G"/250 sx CS II Change Liner size to 4-1/2" 12.6# 13CR80 NSCT _2,,c .... ~--" f -s ; :~;'. ~.~ All depths remain the same. Cement calculations based on the same premises. RECEIVED s E P - B Alask~ 0il & Gas Oons. Oor~f~SsW~ Anchorage ALASKA OIL AND GAS CONSERVATION COMMISSION September 3, 1993 WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 R C Maskell Drilling Engineer Supervisor BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay P-22 BP Exploration Permit No: 93-121 Sur. Loc. 2584'NSL, 2228'EWL, Sec. 31, TllN, R13E, UM Btmhole Loc. 2924'SNL, 1601'WEL, Sec. 32, TllN, R13E, UM Dear Mr. Haskell: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, Russell A. Douglass Commissioner BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. recycled paper b y STATE OF ALASKA ' ALASKA OIL AND GAS CONSERVATION COMMISSION ' PERMIT TO DRILL 2O AAC 25.OO5 a. Type of work Drill [] Redrill ~llb. Type of well. Exploratory l-I Stratigraphic Test [] Development Oil [] Re-Entry [] Doopon Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator BP Exploration 3. Address P. O. Box 196612. Anchorage. Alaska 99519-6612 4. Location of well at surface 2584' NSL, 2228' EWL, SEC. 31, T11N, R13E At top of productive interval 2910' SNL, 2589' WEL, SEC. 32, T11N, R13E At total depth 2924' SNL, 1601' WEL, SEC. 32, T11N, R13E 2. Distance to nearest 113. Distance to nearest well )roperty line ADL 28287-1601' feet P-11-35'@ Surface feet 6. To be completed for deviated wells i Kickoff depth 2850, feet Maximum hole angle 89 18. Casing program s~ze Specifications Hole Casing 30" 20" 16" 13-3/8" 9-7/8" 7-5/8' 6-3/4" 5-1/2" Weight I Grade I CouplingI Length 91.5t/ IH-40I Weld I 80' 681/ IL'8° IButtI 2819' I~ HSl NSCC 5. Datum Elevation (DF or KB) KBE = 86' feet 6. Property Designation ADL 28288 7. Unit or property Name Prudhoe Bay Unit 8. Well number P-22 (33-32-11-13) 9. Approximate spud date I O/5/93 4. Number of acres in property 256O 10. Field and Pool Prudhoe Bay Field/Prudhoe Bay Pool 11. Type Bond(~.,~ 20 AAC 25.025) Number 2S 100302630-277 Amount $200,000. O0 5. Proposed depth (MD and TVD) 12557' MD/9028' TVD feet 17. Anticipated pressure (s~e 20 AAC 25.035 (e)(2)) ,8 o Maximum sudace 3330 psig At total depth (TVD) 8800'/4390 psig I Setting Depth To3 Bottom Quantity of cement MD TVD MD ! TVD (include stage data) 32' 32' 112' 112' 11 yds Arcticset 31' 31' 2850' 2850' lO5O sx cs 111/375 sx "G"/25O sx CS II 30' 30' 11568' 9018' 840 sx Class "G" 11418' 9015' 12557' 9028' Uncemented- Slotted liner 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: feet feet feet feet Plugs (measured) Junk (measured) Length Size Cemented Measured depth True Vertical depth measured true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program [] JDrillinfluid progra,rp.-~, Time vs depth plot [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[-] 21. I hereby certj~ ~at.~¢..~,-'2-',the foregoi~g.~ is true,, and,. correct to the best of my knowledge Si ned ' ...... ~,/'/~/' ,~/.~ J ~ '0//~,,~/~./, c r,.~,~_,..,~~~ T,tleDrfl//n~/En~7~neerSuperv/sor Date'-"""''_ ~_ Commission Use Only / Permit Number iAPI number IApproval ,¢,date.~ .., ISee cover letter ~3-/.2-,/ J50-c,.z.?- 2.2_..3 ~'~' J q,.. ~-¥.~ Jfor other requirements Conditions of approval Samples required [] Yes [] No Mud log required []Yes J~ No Hydrogen sulfide measures [] Yes [] No Directional survey required [] Yes [] No Required working pressure for BOPE 1-12M; I-I3M; 'l~kSM; [-I10M; FI15M; Other: ORIGINAL SIGNEi] tlY by order of Approved by ~USSELL A. DOUGLAS~ Commissioner me commission Date~",.~ ~,.~; Form 10-401 Rev. 12-1-85 Subm;t in ~ripli6~t~ [Well Name: 1P-22 PBU Well Plan Summary I Type of Well (producer or injector): I Producer (HAW) Surface Location: 2696' FNL 3052' FEL Sec 31 T11N R13E Target Location: 2910' FNL 2589' FEL Sec 32 T1 IN R13E Bottom Hole Location: 2924' FNL 1601' FEL Sec 32 T11N R13E I AFE Number: I 4P0470 I Estimated Start Date: I Oct 5 1993 IMD: I 12557' I ITVD: I Well Design (conventional, slimhole, etc.)' [Rig: I Nabors 28-E Operating days to complete: [ 32 I9028' I IKBE: I86' [ Slimhole high angle well. Formation Markers: Formation Tops MD TVD (BKB) Ugnu Zone 4A 3879' - 3867' W. Sak Sands 4860' 4766' Top Seabee 6014' 5667' .,.Kuparuk/Put River Absent IKRU/LCU 8562' 7467' Top Sag River 10702' 8898' Eileen 11068' 8998' Top S adlerochit 11151' 9008' Target 11569' 9018' Total Depth 12557' 9028' Casing/Tubin,,; Pro ram: Wt/Ft Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm Tbg O.D. MD/TVD MD/TVD 30" 20" 91.54/ H-40 Weld 80' 32'/32' 110' 16" 13 3/8" 68/~ L-80 Butt 2819' 31'/31' 2850'/2850' ,,. 9 7/8" 7 5/8" 29.7# NT95HS NSCC 11538' 30'/30' 11568'/9018' 6 3/4" 5 1/2" 17# 13Cr80 NSCC 1139' 11418'/9015' 12557'/9028' 4 1/2" 12.6# 13Cr80 NSCT 11389' 29'/29' 11418'/9015' ~'2 .... , .~, ~ U ~: ~-' ~ ~.. Well Plan Summary Page l Logging Prog Open Hole Logs: 1:3 1/2" Hole 9 7/8" Hole 6:3/4" Hole [Cased Hole Logs: 7 5/8" Casing 5 1/2" Liner ram: None GR/DIL GR None None Mud Program: I Special design considerations I None Surface Mud Properties: ] Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.5 100 20 15 20 9 15 to to to to to to to 9.5 300 60 60 80 10 25 Intermediate Mud Properties: ] Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.0 35 10 5 10 9.5 5 to to to to to to to 10.4 50 15 10 20 10 10 Production Mud Properties: I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.6 30 8 3 7 8 6 to to to to to to to 10.0 45 13 10 15 9 8 Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Directional' · [KOP: 12850' I Maximum Hole Angle: [ 89.8 degrees Close Approach Well: P-11 - 35' away at surface. The above listed wells will be secured during the close approach. Well Plan Summary Page 2 10-3/4" SURFACE CASING CEMENT PROGRAM - BJ SERVICES CASING SIZE' 10-3/4" CIRC. TEMP 38°F SPACER: 75 bbls fresh water ahead of lead slurry. LEAD CEMENT TYPE' ColdSet III ADDITIVES: retarder WEIGHT: 12.2 ppg APPROX #SACKS: 1050 YIELD:1.92 ft3/sx MIX WATER: 10.5 gps THICKENING TIME: Greater than 4 hrs @ 50°F TAIL CEMENT TYPE: Class G ADDITIVES: 2% A-7 +1 ghs FP-6L. WEIGHT: 15.8 ppg YIELD:1.15 ft3/sx APPROX #SACKS: 375 MIX WATER: 4.95 gps THICKENING TIME: Greater than 3 1/2 hrs @ 50°F TOP JOB CEMENT TYPE' ADDITIVES: retarder WEIGHT: 14.5 ppg APPROX #SACKS: 250 Coldset II YIELD:0.96 ft3/sx MIX WATER: 3.89 gps THICKENING TIME: Greater than 2 hrs @ 50°F CENTRALIZER PLACEMENT: 1. Run one(l) bow type centralizer per joint for the first 20 joints. 2. Place the centralizers in the middle of each joint with a stop collar. CEMENT VOLUME: 1. Lead slurry to surface w/100% excess. 2. Tail slurry volume 375 sx 3. Top job volume 250 sx. 7-5/8" INTERMEDIATE CASING CEMENT PROGRAM- BJ SERVICES CIRC. TEMP: 140° F S P A C E R: 50 bbls BJ MCS-4, weighted to current mud weight. LEAD CEMENT TYPE: CLASS G ADDITIVES: 0.4% FL-52+0.5% CD-32+3% A-2+lghs FP-6L WEIGHT: 11.0ppg YIELD: 3.31 ft3/sx MIX WATER' 20.9 gps APPROX #SACKS: 500 THICKENING TIME: Greater than 5 hrs at 140°F FLUID LOSS: 100-150 cc @ 140°F FREE WATER: 0 cc TAIL CEMENT TYPE: CLASS G ADDITIVES: 0.3% FL-52 + 0.5% CD-32 + 0.1% A-2 + lghs FP-6L WEIGHT: 15.Sppg YIELD: 1.14 cu ft/sk MIX WATER: 4.85 gps APPROX # SX: 340 THICKENING TIME: 3 1/2-4 1/2 hrs @ 140°F FLUID LOSS: 100-150 cc @ 140°F FREE WATER: 0 cc CENTRALIZER PLACEMENT: 1 Turbulator centralizer per joint on the bottom 500' of 7- 5/8" casing ( 12 required ). One solid body 7-3/4" x 9-1/4" centralizer or turbolator on first 2 joints inside 10-3/4" surface casing shoe. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 12 bpm. Do not batch mix tail cement. CEMENT VOLUME: 1 .Lead slurry up to 4360' MD (500' above West Sak) with 30% excess to isolate Cretaceous interval. 2. Tail slurry to 500' MD above top Sag River with 30% excess. 3.80' MD 7-5/8", 29.7# capacity for float joints. Prudhoe Bay Drilling Prudhoe Bay, Alaska Well' P-22 File' P-22hwwp2 VERTICAL VIEW .SCALE 1000 fl;. // DIVISION TVD REF: RKO VERTICAL SECTION REF: WELLHEAD HORIZONTAL VIEW (TRUE NORTH) SCALE 1000 ft. / DIVISION SURVEY REF: WELLHEAD 0 0.00' /-i lO. ~5o ~,lel 75o_t! 1000 2850~0.00° ~ 2850 MD TARGET, START OF BUILD ¢_ 1.50 DEG/100 FT 3000- ~ ~9.no° ~ .3450 MD 12.00° ~ 3650 MD 3867~---~15.44° ~ 3879 MD UG4A 4000~ .38~18.00° ~ 4050 MD ~21.00' ~ 4250 MD ~24.00' ~ 4450 ~D ' ~27.00' ~ 4650 MD ~30.00~ e 4850 HD ~nnn~ ~33.00' ~ 5050 MD .... 36.00' ~ 5a50 M~ 55 3 ll~l ~ F 5 ~45.04' ~ 5853 M~ EN~ O. $UILD 5667 1235 ~5'04~ ~ 6014 M~ TOP SEA3EE/CM3 6000~ 7000 ~ 7467 ' ~3038 ~5.04' ~ 856~ MD !KPU/LCU 8595~ 4167 '-.~4~.04' ~ 10158 MD 8898/ ' 89~i~ 4615 '~.. 06.79' ~ 10708 MD 9000- ~ 54~6. ~ '~ -250 750 1750 2750 3750 4750 5750 VERTICAL SECTION PLANE: 91.90' 10000 Wo 7.625 OD, @ 115682D, 9018 TVDI -----~. ~ :-.~.-' ~-~ ~.~ r - 2850 MD, 2850 TVD ' I I I I I I I I I I I I I ~$ 0,2, CASING POINT DATA OD MD Inc Az; TVD North Ecst 10.750 in. 2850 0.00 0.00 2850 0 0 7.625 ~n. 11568 89.04 92.29 9018 -209 5461 CRITICAL PBINT DATA TIE IN 0 BASE 1887 PERMAFROST TARGET, START 2850 DF BUILD ~ 1.50 DEG/IO0 FT UU4A :~879 END BF BUILD 5853 TOP SEABEE/CM3 6014 IKRU/LCU 8562 START OF 10155 CURVE ~ 4.00 DEG/IO0 Fl TOP SAG 1070~ TflP SHUBLIK 10764 EILEEN MEMBER 11068 TSAD/Z4B II151 TARGET/HORIZDNTI269 TARGET 1 11569 TARGET 2/TD i2557 Inc Azi TVD North Cost O. O0 O. O0 0 0 0 O. O0 O. O0 1887 0 0 0.00 0.00 2850 0 0 th 44 Ud.bl 3867 -6 45.04 92.51 5553 -49 1120 45.04 92.51 5667 -54 1~34 45.04 92.51 7467 -133 3035 45.04 92,51 8595 -182 4163 66 79 69 25 81 42 84 74 89 42 89 04 89 79 91 20 9! 08 90 56 90 42 90 83 92 29 88 25 8898 -196 4611 89~1 -197 4668 8998 -201 4962 9008 -202 5045 9014 -203 5162 9018 -209 5462 9028 -213 6450 o 89.79' ~ 12557 MD t 6750 VERTICAL VIEW SCALE 250 ft. / DIVISION TVD REF: RKO VERTICAL SECTION REF: WELLHEAD 8500 -- 8750 BHL DATA TVD 9028.00 MD 12557.00 VS 6453.26, North -213.47 Eas[ 6449.72 I'~65.0ao e 10658 MD 8898.--4.-46i5"~6.79°' ~ 10702 MD TOP=SAG,_ 8~1~--1---4672 '~-~9. ~5° ¢_ 1 0764 MD , U? .~HUBL I~: U~U I .... ~ 77, O1 ° @ 1095~ MD = ~~I _ ~--81.42~ ~ 11068 MD EILEEN MEMBER 7.625 BO, ~ 11J68 MD, 9018 TVD ~ ~ ~ ~ /J -- i -- -- ' ' ~l'O ~4~Z~~.~ n '¢ 11969 MD o 89'65~ P 12369 MD ~/I 6437 6453 % ~ f''89.04* 8 11569 MD TARGET 1 ./c°x 2UCOI ~ t 89.04' ~ ]1564 MD / N 89,42' ~ 11269 MD TARGET/HORIZONTAL POINT 89.79' e 1~541 MD ~ 84.74' ~ II151 MD TSAD/Z4B 89.79' e 12557 MD TARGET 2/TD ~aoo i ! I ~ ! ~ ! I I 4500 4750 5000 5250 5500 5750 6000 6450 6bO0 VERTICAL SECTION PLANE: 91.90~ CLJ 0~' 0'~ o f"~ --OJ .q/'O -~ !.q ~ ~ ~. >_c ,,_-% ~ , ,~_~ o -- c L..% .'-'~' 0 k]_~ : ~ >,'i eu ,_~ k~JCc U >~..~ __.k_ ',,, o ,,.,..- ~.'~ ---~ --~ ~,>= / / / / / .\ r~ ~ ~ r',,,~¢'u r'q oh .mZ~Z.-'ZZZZZZZZZZZ~-~ZTZZZZZ~,T ' ** CHECK LIST FOR NEW WELL PERMITS ITEM APPROVE DATE (2) Loc [2 thru 8 . 2. 3. 4. 5. 6. 7 8 [9 t ru 13 10. ~' ] ~, ,'*'"] 11. [10 & 13] 12 (4) Casg ~" :'~:" ~ ~'~ [14 thru 22] 15 (5) BOPE [23 thru 28] 16 1 1 1 2 2 2 23. 24. 25. 26. 27. 28. Company Is permit fee attached ............................................... Is well to be located in a defined pool .............................. Is well located proper distance from property line ................... Is well located proper distance from other wells ..................... Is sufficient undndicated acreage available in this pool ............. Is well to be deviated $ is wellbore plat included ................... Is operator the only affected party ............... Can permit be approved before 15-day wait Does operator have a bond in force..' ................................. Is a conservation order needed ...................................... . Is administrative approval needed .................................... · Is lease ncrnber appropriate.' ........................................ · Does well have a unique name & n~nber ................................ · Is conductor string provided ......................................... · Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. · Is enough cement used to circulate on conductor & surface ............ · Will cement tie in surface & intermediate or production strings ...... · Will cement cover all known productive horizons ..................... . Will all casing give adequate safety in collapse, tension, and burst. Lease g We]] ~ z~' -~--~'~Z <g'G~ /o_~_~_ NO REMARKS 7 8 9 0. Is well to be kicked off from an existing wellbore ................... 1. Is old wellbore abandonment procedure included on 10-403 ............. 2. Is adequate wellbore separation proposed ............................. Is a diverter system required ........................................ Is drilling fluid program schematic & list of equipment adequate ..... Are necessary diagrams & descriptions of diverter & BOPE attached .... Does BOPE have sufficient pressure rating -- test to ~-~ psig ..... Does choke manifold comply w/API RP-53 (May 84) ...................... Is presence of H2S gas probable ...................................... ( 6 ) O t h e r ~£/_ ~"//~/~. '~29 thru 31']' [32] '' (8) Add1 geo 1 ogy' en9 i nee r i n9: DWJ . _~ MTM ~ RAD RPC,~f?/___ BEW~ TAB ~ rev 6/93 jo/6.011 29· 30. 31. 32. 33. FOR EXPLORATORY & STRATIGRAPHIC WELLS: Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Name and phone nLrnber of contact to supply weekly progress data ...... Additional requirements ............................................. INITIAL GEOL UNIT ON/OFF POOL CLASS STATUS AREA ~ SHORE / / ./ MERIDIAN' UM/~ WELL TYPE' Exp~.~ N~. Inj SM Red r i l 1 Rev m i.ii Z Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX, No special effort has been made to chronologically organize this category of information. Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: BIT RUN 5 P - 22 500292239600 BP EXPLORATION (ALASKA) INC. SPERRY SUN DRILLING SERVICES 21-FEB-94 BIT RUN 6 BIT RUN 7 SHERRITT JACKSON THOMAS CARLILE PARNELL SCHOFIELD JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: BIT RUN 8 SHERRITT CARLILE BIT RUN 10 JACKSON PARNELL BIT RUN 11 THOMAS SCHOFIELD BIT RUN 12 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 31 liN 13E 2696 JACKSON CARLILE 3052 OPEN HOLE BIT SIZE (IN) SIZE 88.60 87.60 53.60 1ST STRING 2ND STRING 3RD STRING 9.875 7.625 PRODUCTION STRING 6.750 REMARKS: MWD - DGR. ALL DEPTHS ARE MEASURED BIT DEPTHS. (IN) DEPTH (FT 11350.0 12560.0 MWD RUNS 1 THROUGH 4 WERE DIRECTIONAL ONLY. MWD RUNS 5 THROUGH 12 WERE DIRECTIONAL WITH GAMMA RAY. NO FOOTAGE WAS DRILLED ON MWD RUN 9. GR DATA FROM 8224' TO 8417' WAS WIPED SECTION (MAD). FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 8224.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MAD MWD MWD MWD MWD MWD MWD MWD $ REMARKS: STOP DEPTH 12515.0 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP 1 6 7 8 10 11 12 MERGE BASE 8224.0 8417.0 9209.0 10505.0 10505.0 10824.0 10824.0 11119.0 11119.0 11368.0 11368.0 12089.0 12089.0 12296.0 12296.0 12560.0 MERGED MWD PASS. NO DEPTH SHIFTS WERE APPLIED. A MAD PASS FROM WIPED SECTION IS ALSO INCLUDED IN THIS FILE (8224-8417'). CN : BP EXPLORATION WN : P - 22 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE~ 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units GR MWD 68 1 AAPI ROP MWD 68 1 FPHR API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 91 948 38 6 4 99 789 97 5 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 130 Tape File Start Depth = 12700.000000 Tape File End Depth = 7247.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 32722 datums Tape Subfile: 2 231 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 5 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9134.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMTTMANGLE: STOP DEPTH 10438.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 5. 03-OCT-94 1.32 5.1 MEMORY 10505.0 9209.0 10505.0 0 0.0 0.0 TOOL NUMBER 137 9.875 0.0 LSND 10.20 0.0 8.9 600 0.0 0.000 0.000 0.000 0.000 0.0 155.0 0.0 0.0 0.00 0.000 0.0 0 CN : BP EXPLORATION WN : P - 22 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE~ 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 91 948 38 6 4 99 789 97 5 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 33 Tape File Start Depth = 10506.000000 Tape File End Depth = 9134.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 8236 datums Tape Subfile: 3 96 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Ta~e Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 6 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10437.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10755.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ): R~S: MWD RUN 6. 04-OCT-94 1.32 5.1 MEMORY 10824.0 10505.0 10824.0 0 0.0 0.0 TOOL NUMBER 137 9.875 0.0 LSND 10.20 0.0 8.6 600 0.0 0.000 0.000 0.000 0.000 0.0 145.9 0.0 0.0 0.00 0.00O 0.0 0 CN : BP EXPLORATION WN : P - 22 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE~ 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 91 948 38 6 4 99 789 97 5 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 10 Tape File Start Depth = 10823.000000 Tape File End Depth = 10437.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 35042 datums Tape Subfile: 4 73 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tap~ Subtile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 7 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10733.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11055.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ): REMARKS: MWD RUN 7. 06-OCT-94 1.32 5.1 MEMORY 11119.0 10824.0 11119.0 0 0.0 0.0 TOOL NUMBER 137 9.875 0.0 LSND 10.20 0.0 9.1 600 0.0 0.000 0.000 0.000 0.000 0.0 150.0 0.0 0.0 0.00 0.000 0.0 0 CN : BP EXPLORATION WN : P - 22 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 91 948 38 6 4 99 789 97 5 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 10 Tape File Start Depth = 11118.000000 Tape File End Depth = 10733.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 10550 datums Tape Subfile: 5 73 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 8 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11051.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11300.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 8. 07-OCT-94 1.32 5.1 MEMORY 11368.0 11119.0 11368.0 0 0.0 0.0 TOOL NUMBER 137 9.875 0.0 LSND 10.20 0.0 8.9 600 0.0 0.000 0.000 0.000 0.000 0.0 150.8 0.0 0.0 0.00 0.000 0.0 0 CN : BP EXPLORATION WN : P - 22 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 6'8 1 FPHR 4 4 91 948 38 6 4 99 789 97 5 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 11368.000000 Tape File End Depth = 11051.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 36948 datums Tape Subfile: 6 71 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tap~ Subtile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 10 DEPTH INCREMENT: 0.5000' FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 11178.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 12043.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ): 11-OCT-94 1.32 5.1 MEMORY 12089.0 11368.0 12089.0 0 0.0 0.0 TOOL NUMBER 128 6.750 11350.0 XANVIS 9.20 0.0 9.3 51000 0.0 0.000 0.000 0.000 0.000 0.00 0.000 0.0 0 0.0 158.5 0.0 0.0 REMARKS: MWD RUN 10 (NO FOOTAGE DRILLED ON MWD RUN 9). CN : BP EXPLORATION WN : P - 22 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 91 948 38 6 4 99 789 97 5 * DATA RECORD (TYPE~ 0) 1014 BYTES * Total Data Records: 22 Tape File Start Depth = 12088.000000 Tape File End Depth = 11178.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 16014 datums Tape Subfile: 7 85 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 11 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 12043.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): STOP DEPTH 12250.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ): REMARKS: MWD RUN 11. 12-OCT-94 1.32 5.1 MEMORY 12296.0 12089.0 12296.0 0 0.0 0.0 TOOL NUMBER 128 6.750 11350.0 XANVIS 9.20 0.0 9.3 53000 0.0 0.000 0.000 0.000 0.000 0.0 150.1 0.0 0.0 0.00 0.000 0.0 0 CN : BP EXPLORATION WN : P - 22 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 6~8 1 FPHR 4 4 91 948 38 6 4 99 789 97 5 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 12295.000000 Tape File End Depth = 12043.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 38464 datums Tape Subfile: 8 70 records... Minimum record length: 18 bytes Maximum record length: 1014 bytes CN : BP EXPLORATION WN : P - 22 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 91 948 38 6 4 99 789 97 5 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 8 Tape File Start Depth = 12560.000000 Tape File End Depth = 12251.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 17872 datums Tape Subfile: 9 71 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 9 is type: LIS FILE HEADER FILE NUMBER: 8 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 12 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 12251.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 12515.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY-(OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 12. 13-OCT-94 1.32 5.1 MEMORY 12560.0 12296.0 12560.0 0 0.0 0.0 TOOL NUMBER 128 6.750 11350.0 XANVIS 9.50 0.0 9.3 53000 0.0 0.000 0.000 0.000 0.000 0.0 161.1 0.0 0.0 0.00 0.00O 0.0 0 Tape Su~file 10 is type: LIS FILE HEADER FILE NUMBER: 9 RAW MAD Curves and log header data for each pass of each run in separate files. MAD RUN NUMBER: 1 MAD PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8225.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 8417.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 1.32 5.1 MEMORY 0.0 0.0 0.0 0 0.0 0.0 TOOL NUMBER 137 9.875 0.0 LSND 10.20 0.0 8.9 600 0.0 0.000 0.000 0.000 0.000 0.0 155.0 0.0 . 0.0 0.00 0.000 0.0 0 REMARKS: ! MAD PASS FROM WIPED SECTION. MWD RUN 5. $ CN : BP EXPLORATION WN : P - 22 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA MUD INFORMATION IS FROM * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 1 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 4 91 948 38 6 * DATA RECORD (TYPE# 0) 1022 BYTES * Total Data Records: Tape File Start Depth = 8417.000000 Tape File End Depth = 8225.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 39235 datums Tape Subfile: 10' 69 records... Minimum record length: Maximum record length: 38 bytes 1022 bytes Tape Subfile 11 is type: LIS 94/ 2/21 01 **** REEL TRAILER **** 94/ 3/ 4 01 Tape Subfile: 11 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Fri 4 MAR 94 10:33a Elapsed execution time = 27.18 seconds. SYSTEM RETURN CODE = 0 Tape Subtile 11 is type: LIS 94/ 2/21 01 **** REEL TRAILER **** 94/ 3/ 4 01 Tape Subfile: 11 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Fri 4 MAR 94 10:33a Elapsed execution time = 27.18 seconds. SYSTEM RETURN CODE = 0