HomeMy WebLinkAbout202-0027. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU NK-11A
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
202-002
50-029-22789-01-00
17867
Conductor
Surface
Intermediate
Production
Liner
9334
80
7995
10667
7348
13799
20"
13-3/8"
9-5/8"
7" x 5-1/2"
7476
35 - 115
34 - 8029
32 - 10699
7610 -14958
35 - 115
34 - 5014
32 - 5755
4890 - 8036
none
520
2260
4760
6280
13799 , 14100
1530
5020
6870
7740
none
4-1/2" 12.6# L-80 30 - 2227
none
Structural
No Packer
No SSSV
none
none
Bo York
Operations Manager
Ryan Holt
Ryan.Holt@hilcorp.com
(907) 659-5102
PRUDHOE BAY, NIAKUK OIL
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0034630
30 - 2227
0
0
0
0
0
0
0
0
0
0
N/A
13b. Pools active after work:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
Digitally signed by Bo York
(1248)
DN: cn=Bo York (1248)
Date: 2024.07.10 16:27:00 -
08'00'
Bo York
(1248)
By Grace Christianson at 9:10 am, Jul 11, 2024
WCB 9-30-2024
RBDMS JSB 071124
DSR-7/11/24
ACTIVITYDATE SUMMARY
6/10/2024
T/I/O = SSV/420/250. Temp = SI. WHPs (Pre inspection). No AL or flowline. Site
clean and free of debris. No leaks or sheen observed.
SV, WV, SSV = C. MV = O. IA, OA = OTG. 11:00
6/11/2024
T/I/O = 350/ 400/250 psi . Temp = SI. WHPs (Well inspection). (Inspected by Kam
St.JohnBrian Bixby). Wellhead, wellhouse and cellar are clean and dry. Surface area
around well is clean and free of debris. Well ID sign attached to wellhouse.
Daily Report of Well Operations
PBU NK-11A
Suspended Well Inspection Review Report Reviewed By:
P.I. Suprv
Comm ________
JBR 07/24/2024
InspectNo:susKPS240611142941
Well Pressures (psi):
Date Inspected:6/11/2024
Inspector:Kam StJohn
If Verified, How?Other (specify in comments)
Suspension Date:2/22/2002
Tubing:350
IA:400
OA:250
Operator:Hilcorp North Slope, LLC
Operator Rep:Ryan Holt
Date AOGCC Notified:6/10/2024
Type of Inspection:Subsequent
Well Name:PRUDHOE BAY UN NIA NK-11A
Permit Number:2020020
Wellhead Condition
Well head in good condition; no visible leaks or stains.
Surrounding Surface Condition
Good. No standing water on pad or in well house. Still some snow in the pit. No sheen or stains.
Condition of Cellar
Good; no rat hole; gravel was dry; no sheen or stains.
Comments
Location verified by pad map and well sign.
Supervisor Comments
Suspension Approval:Completion Report
Location Verified?
Offshore?
Fluid in Cellar?
Wellbore Diagram Avail?
Photos Taken?
VR Plug(s) Installed?
BPV Installed?
Wednesday, July 24, 2024
9
9
9
9
9
9
$WWDFKHG3KRWRV
2024-0611_Suspend_PBU_NK-11A_photos_ksj
Page 1 of 2
Suspended Well Inspection – PBU NK-11A
PTD 2020020
AOGCC Inspection Rpt # susKSJ240611142310
Photos by AOGCC Inspector K. StJohn
6-11-2024
2024-0611_Suspend_PBU_NK-11A_photos_ksj
Page 2 of 2
Operator Name:2.
Exploratory Development
Service
5
Permit to Drill Number:202-002
6.API Number:50-029-22789-01-00
PRUDHOE BAY, NIAKUK OIL
Hilcorp North Slope, LLC 5.
Field/Pools:9.
Well Name and Number:
ADL 034630
Property Designation (Lease Number):10.
8.
NK-11a
7.If perforating:
What Regulation or Conservation Order governs well spacing in this pool?
Will planned perforations require a spacing exception?
Stratigraphic
Current Well Class:4.
Type of Request:1.Abandon Plug Perforations Fracture Stimulate Repair Well
Operations shutdown
Renew suspension
Op Shutdown
GAS
GSTOR WAG
SPLUG
Abandoned
Oil WINJ
Exploratory Development 5Stratigraphic Service
WDSPL
12. Attachments:
PRESENT WELL CONDITION SUMMARY
17867
Effective Depth MD:
L-80
11.
9/1/2020
Commission Representative:
15.
Suspended 5
Contact Name: Ryan Holt
Contact Email: Ryan.Holt@hilcorp.com
Authorized Name: Bo York
Authorized Title:Operations Manager
Authorized Signature:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other:
Yes No Spacing Exception Required?Subsequent Form Required:
Approved by:COMMISSIONER
APPROVED BYTHE
COMMISSION Date:
5OtherAlter Casing
Pull Tubing
Conditions of approval: Notify Commission so that a representative may witness Sundry Number:
COMMISSION USE ONLY
17. I hereby certify that the foregoing is true and the procedure approved herein will not
be deviated from without prior written approval.
Detailed Operations Program
Packers and SSSV Type:
No SSSV Installed
Packers and SSSV MD (ft) and TVD (ft):
Perforation Depth MD (ft):Tubing Size:
Size
Total Depth MD (ft):Total Depth TVD(ft):
9334
Effective Depth TVD:Plugs (MD):Junk (MD):
Other Stimulate
Re-enter Susp Well
Suspend
Plug for Redrill
Perforate
Perforate New Pool
No Packer
No SSSV Installed
Date:
Liner 7348 7" x 5-1/2" 7610 -14958 4890 - 8036 8160 / 7740 7020 / 6280
Well Status after proposed work:
16. Verbal Approval:
Change Approved Program
34 - 8029 34 - 5014
14. Estimated Date for Commencing Operations:
BOP Sketch
35 - 115
Structural
6870
Proposal Summary 13. Well Class after proposed work:
No Packer
None 4-1/2" 12.6# L-80 30 - 2227
Production
13799 7476 See Attachment
35 - 115 520
13-3/8"
9-5/8"
Contact Phone:(907) 659-5102
Date: 8/21/2020
4760
80 153020"Conductor
2260
GINJ
5
Post Initial Injection MIT Req'd? Yes No
5
Comm.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
Surface 7995 5020
Intermediate 10667 32 - 10699 32 - 5755
Address:3800 Centerpoint Dr, Suite 1400,
Anchorage, AK 99503
3.
No 5Yes
Casing Length MD TVD Burst
Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft):
Collapse
MPSP (psi):
Wellbore Schematic
Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng
Form 10-403 Revised 03/2020 Approved application is valid for 12 months from the date of approval.
By Samantha Carlisle at 12:12 pm, Aug 21, 2020
320-350
Digitally signed by Bo York
DN: cn=Bo York, c=US, o=HIlcorp
Alaska LLC, ou=Alaska North
Slope, email=byork@hilcorp.com
Date: 2020.08.21 10:10:26 -08'00'
Bo York
, ADL 034629
DSR-8/21/2020
SFD 8/21/2020
SFD 8/21/2020MGR25AUG2020
10-404Yes uired?
C
8/25/2020
dts 8/25/2020 JLC 8/25/2020
RBDMS HEW 8/26/2020
Hilcorp North Slope, LLC
Bo York, PBE Operations Manager
3800 Centerpoint Dr, Suite 1400
Anchorage, Alaska 99503
August 11, 2020
Mr. Jeremy Price
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Anchorage, Alaska 99501
Subject: Niakuk Well NK-11A (PTD #202002)
Application for Renewal of Existing Suspension (10-403)
Dear Mr. Price,
An AOGCC witnessed suspended well inspection of Niakuk well NK-11A was conducted on
09/15/2019 (20 AAC 25.110 (h)). This recently submitted suspended well inspection reflects the
current condition of the well (reference 20 AAC 25.110 (f)) and supports the request for renewal
of suspension. Recent events from this well indicate that this well is mechanically sound.
Specific attachments include:
x Wellbore diagram illustrating the current configuration of the well
x Suspended Well Site Inspection form documenting the pressures and site condition
Niakuk well NK-11A was suspended on 02/22/2002. It is located on a pad with active wells
and/or service wells. The strata through which the well was drilled is neither abnormally
geopressured or depleted. The well is mechanically sound as proven by a pressure test of the
casing, liner and cement plug on 02/21/2002. Based on these conditions and the inspection on
09/15/2019 Niakuk well NK-11A meets the provisions required in 20 AAC 25.110 (a)(1).
Hilcorp North Slope, LLC requests approval for renewal of the existing suspension status for this
well. Attached is an Application for Sundry Approval (10-403) with a technical justification
summarizing the information on the current status and condition of the well (reference 20 AAC
25.110 (a), (b), (e), (h)).
In summary, Hilcorp believes Niakuk well NK-11A is mechanically sound and secure and meets
the requirements for renewal of suspended status.
If you have any questions, please call me at 907-777-8345 or Ryan Holt/ Andy Ogg at 659-
5102.
Sincerely,
Bo York
PBE Operations Manager
Digitally signed by Bo York
DN: cn=Bo York, c=US, o=HIlcorp
Alaska LLC, ou=Alaska North
Slope, email=byork@hilcorp.com
Date: 2020.08.21 10:10:06 -08'00'
Bo York
Attachments
Technical Justification
2019 Suspended Well Site Inspection form
Wellbore Schematic
Niakuk Well NK-11A (PTD #202002)
Technical Justification for Renewal of Suspended Status
August 11, 2020
Well History and Status
Niakuk well NK-11A (PTD #202002) was suspended on 02/22/2002 after problems running the
liner in a sidetrack hole. The liner top packer prematurely set at 7618’ MD (about 2900’ MD
above the intended depth) after an obstruction was encountered while running the liner. A
retainer was set in the liner at 14100’ MD with 39 barrels of cement pumped below the retainer
and the top of cement above the retainer at 13799’ MD. A 4-1/2” kill string was left in the well
from surface to 2227’ MD.
The well is mechanically sound as proven by a pressure test of the casing, liner and cement
plug on 02/21/2002. The well will not allow the migration of fluids, will not damage freshwater or
producing or potentially producing formations, will not impair the recovery of oil or gas, and is
secure, safe and not a threat to public health.
The strata through which the well was drilled is neither abnormally geo-pressured or depleted.
Condition of the Wellhead and Surface Location
Niakuk well NK-11A is located on an active, well maintained pad with clean gravel. The pit and
surrounding area are in good condition. There is no discoloration and no sheens on the pad,
pits, or in nearby water.
The well pressure readings are T/I/O = -/300/250 psi.
Request
Hilcorp North Slope, LLC requests approval for renewal of the existing suspension status for
NK-11A.
A variance to the provisions of 20 AAC 25.110 (c) (2) is also requested under 20 AAC 25.112 (i)
to allow the well to remain as suspended in its current condition. All hydrocarbon intervals are
isolated and there are no underground sources of fresh water in this area.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
RECEIVED
1. Operations Performed
Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑
Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Chan �`�rs
Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other ssp€ctidPf 0
2. Operator Name: BP Exploration (Alaska), Inc
4. Well Class Before Work
Development 0 Exploratory ❑
5. Permit to Drill Number: 202402
3. Address: P.O. Box 196612 Anchorage,
AK 99519-6612
Stratigraphic ❑ Service ❑
1 6. API Number: 50-029-22789-01-00
7. Property Designation (Lease Number): ADL 034630 & 034629 =
8. Well Name and Number: PgU NK -11A
9. Logs (List logs and submit electronic and ported data per 20AAC25.071):
10. Field/Pools:
PRUDHOE BAY, NIAKUK OIL
11. Present Well Condition Summary:
Total Depth: measured 17867 feet Plugs measured 13799, 14100 feet
true vertical 9334 feet Junk measured None feet
Effective Depth: measured 13799 feet Packer measured None feet
true vertical 7476 feet Packer true vertical feet
Casing: Length: Size: MD: TVD: Burst: Collapse:
Structural
Conductor 80 20" 35-115 35-115 1530 520
Surface 7995 13-3/8" 34-8029 34-5014 5020 2260
Intermediate 10667 9-5/8" 32-10699 32-5755 5870 4760
Production
Liner 7348 7" x 5-1/2" 7610-14958 4890-8036 8160/7740 7020/6280
Perforation Depth: Measured depth: None feet
True vertical depth: feet
Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# L-80 30-2227 30-2227
Packers and SSSV (type, measured and None
true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil -Bbl
Gas-Mcf
Water -Bbl
Casing Pressure
Tubing Pressure
Prior to well operation:
Suspended
Subsequent to operation:
14. Attachments: (required per 20 MC 25.070.25.071,&25.2&3)
15. Well Class after work:
Daily Report of Well Operations 0
Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑
Copies of Logs and Surveys Run ❑
16. Well Status after work: oil ❑ Gas ❑ WDSPL ❑
Printed and Electronic Fracture Stimulation Data ❑ 1
GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP 0 SPLUG ❑
17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C. 0. Exempt:
NIA
Authorized Name: Lastufka, Joseph N Contact Name: Montgomery, Travis J
Authorized Title: peciali Contact Email: Trevis.Monlgomery(o)bp.com
Authorized Signature: Date: t0,(5' Contact Phone: +1 907 564 4127
IF
77�
Form 10-404 Revised 04/2017 - Pt61_C.-) L IBDMSIL6✓OCT 2 12019 Submit Original Only
5/5/2019
T/1/0=220/300/250 LTT Master Valve PASSED
T/I/O = SSV/320/240. Temp = SI. Pre -inspection (compliance). No AL or flowline. Site
clean of debris. No leaks or sheens noted.
9/10/2019
SV, WV, SSV = C. MV = O. IA, OA = OTG. 11:15
TWO = SSV/300/240. Temp = SI. AOGCC SU Inspection (Regulatory Compliance). State
witnessed by Jeff Jones. Pictures taken. Called grease crew to service leaking MV.
9/15/2019
SV, WV, SSV = C. MV = O. IA, OA = CTG. 12:40
Suspended Well Site Inspection Form Initial Inspection
Notify AOGCC Inspectors at least 10 days prior to inspection to allow witness
Well Name: NK -11A Field/Pool: Prudhoe Bay / Prudhoe Oil
Permit # (PTD): 2020020 API Number: 50-029-22789-01
Operator: BP EXPLORATION (ALASKA) INC Date Suspended: 2/22/2002
Surface Location: Section: 36 Twsp: 12N Range: 15E
Nearest active pad or road: NK access road
Take to Location
Digital camera
Brief well history
Latest Sundry or Completion report
Past Site Visit documentation
Pressure gauges, fittings, tools
Map showing well location /Aerial photos
Wellbore diagram showing downhole condition
Site clearance documentation
Sample containers for fluids on or near pad
Condition of Surface Location AOGCC requires:
1) a description of the condition of the surface location, including discoloration, fluids or sheens visible
on the ground or in any nearby water,
2) photographs showing the condition of the location surrounding the well
General location condition:
raa or location surface:
Location cleanup needed:
Pits condition:
Surrounding area condition:
Water/fluids on pad:
Discoloration, Sheens on pe
Samples taken: None
Photographs taken (# and
Condition of Wellhead AOGCC requires:
1) a description of the condition of the wellhead, 2) well pressure readings, where practicable,
3) photographs showing the wellhead condition
Wellhead/tree/valve description, condition: S �eL1 1, D
Cellar description, conditio
Rat Hole
Wellhouse or protecti a ba
Well identification sign:
Tubing Pressure (orcasinr
Annulus pressures:
Wellhead Photos taken (#
Operator Rep (name
AOGCC Inspector:
Inspection Date:
Time of arrival:
Site access method
fluids: A/m Ile-
signature):
t
signature): Josh
roaa
AOGCC Notice Date: 9/13/2019
Time of Departure: i j
r'=s.
WELL: NK -11A
�NlIffP
/ �.: � 1yi OREPATOq A�w Sev Uni
2278
SUR IOCAMIN SE 1 C- Sec M T,, 815E
l(j/
G7{
�,.
L
7
a
�r-
" vwvwiopj
low
W\ I
:1
NK-D8A -
G... Mi412C NK.-7 2B.' NK-0 RB1
NKABB
NK-12A
F,F 2•'A NK -M
WP D'
f`F T �1
NK-11
- t F-g1 _
i kk P2A
L&wP9:2
i
I
�i � Lf�28A
I& L-28.AL1 '
1,5-23P6t- LB-248PBI
L5-K, ( ._
L 24
I L5-leAL2
TREE = 4-1/16" 5M CNV
WELLHEAD=
FMC
ACTUATOR=
BAKER
OKB. ELEV =
59.82'
REF ELEV =
5395'
BF. ELEV=
21.75'
KOP =
2450'
Max AgIle =
76' @ 9994'
Datum MD =
17649'
Datum TVD =
9200' SS
NK -11A
SUSPENDED
I/2" TBG, 12.6#, L-80, .0152 bpf, D = 3.958" J—L 2227•
Minimum 1D= 3.725"@ 31'
XO PUP UNDER TBG HANGER
TOPOFBAKHRTERACKSLV,D=7.500" 7610'
9-5/8" X 7" BAKER ZXP PKR, D = 6.276" 7618'
9-5/8" X 7" BKR FLEXLOK FGR, D = 6.276" 7626'
13-3/8- CSG, 68#, L-80, D = 12.415"
7" LNR, 29#, L-80, .0371 bpf, D = 6.184"
�:�:39:Ra657 :-I ia.��CfI: ➢
FES E7SV H 10727'
PERFORATION SLIMIMRY
REF LOG:
ANGLEATTOPPERF:
Note: Refer to Production DB for historical perf data
OF 542" CMT RETAINER
SAFETY NOTES: *WELL SUSPENDED W/ 2227' OF
4-1/2" 12.6# KILL STRING, 3.725" ID XO PUP
UNDER TBG HGP. WELL ANGLE> 700 @ 4744'.
NOTE PRE NIF11A SIDETRACK WELLBORE NOT
SHOWN ON THIS DIAGRAM BELOW WHIPSTOCK
GAS LIFT MANDRELS
ST MD TVD DEV TYPE VTj LV I LATCH I PORT DATE
7623' H 7" RS NF. ®= 6.188'
9-5/8" CSG MLLOLR VIA NDOW
10699'-10715' ( OFF 1NFPSTOCK )
1 13147' 1
DATE REV BY COMMENTS
DATE REV BY COMMENTS
09/09198ORIGINALCOMPLETION
0222102 RIGSIDETRACK (NK -11A)
09/08/06 CS/PJC ND/ MO DATUM CORRECTION
10/10/19 DO/JMD ADDED OKB, REF, BF & XO CORRECTION
I 7" LNR 29#, L-80, .0371 bpf, ID = 6.184' I
1 14958'
17'X5-12"LNRXO.ID=4.800"
NWKUK UNIT
WELL: NK -IIA
PERMIT No: 202-0020
API No: 50-029-22789-01
T12N, R15E 1311' NSL & 1021' WEL
BP Exploration (Alaska)
STATE OF ALASKA
•ALASKA OIL AND GAS CONSERVATION COMMI N
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed
Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0
Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0
Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other:Suspend Well Q
2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 202-002
3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory 0
AK 99519-6612 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-22789-01-00
7. Property Designation(Lease Number): ADL 0034630 8. Well Name and Number: NIA NK-11A
9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools:
PRUDHOE BAY,NIAKUK OIL
11.Present Well Condition Summary: fi ,4_, ._ ! 0 a it
Total Depth: measured 17867 feet Plugs measured 13799/14100 feet , + 3V5
true vertical 9334 feet Junk
measured feet `)r,
Effective Depth: measured 13799 feet Packer measured 7618 feet , w
true vertical 7476 feet 0 x` 1
Packer true vertical 4892 feet � �0:^3 1/41
Casing: Length: Size: MD: TVD: Burst: Collapse:
Structural
Conductor 80 20"94#H-40 35-115 35-115 1530 520
Surface 8001 13-3/8"68#L-80 34-8035 34-5016 5020 2260
Intermediate 10667 9-5/8"47#L-80 32-10699 32-5755 6870 4760
Production
Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment
Perforation Depth: Measured depth: feet
True vertical depth: feet SCANNED N 0 V 1 2 2015
Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 30-2227 30-2226
Packers and SSSV(type,measured and 7"Baker ZXP Top Packer 7618 4892
true vertical depth)
12.Stimulation or cement squeeze summary:
Intervals treated(measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: 0 0 0 0 0
Subsequent to operation: 0 0 0 0 0
14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work:
Daily Report of Well Operations Q Exploratory ❑ Development Q Service 0 Stratigraphic ❑
Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 0 Gas 0 WDSPL 0
Printed and Electronic Fracture Stimulation Data 0 GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP Q SPLUG 0
17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt:
Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com
Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer
Signature A.....�� �/'� Phone +1 907 564 4424 Date 8/6/15
Form 10-404 Revised 5/2015 ir f2 q/2,0, A ?/ J
mit Original Only
RBDMSj AU] 1 4 2015
• 111/1
a)
Q o C) 0 0 0 0
t4 N O O N M O
Lf) N O N
O N I` CD N-
U
y 0 CD 0 0 0 0
i M N I- O V co
in O 00 — I�
m 10 CD CO I,- 00
up O Ln O O O
LD cr M N
O c- O N
Ln Ln N- 00 N
0
H
O a)
143 N O) CD
M M M 00 v- M
4.0C
CO) LD 00
Ln M 0) CD Ln N
(D v- O
c- O M N
V
as I
4-11
O Ln
r L() N c- O O
co co co CD M co
• Y
Z O O O
O
O 00 CO O 00 00
J J 00 J
4t 4t 4t co
oo
•NN ,rN. N
CO coO
U O M CO N N
N LD I�
CA LD
++ r uo M N-
O)O O In O O
C 00 O LI7 I� c-
JCO CD 10 a- N
W
C 0
Q
LJU
W
0 U_ C 0co
Z W W W
Q D Z Z
0 O) Z J J H
. •
0
a)
U
(6
f0
a)
U
a)
a)
U
co
a)
2 NL
_o >- u- E
Q'
c M E a)
n. a) cn ~
� =O II -O< ± g
= n3 i
r 2o
oz �
a
L Z0 CM
o
a a -0
a) Q c
x `13
a)
= cp
m o
0
D � —
m -o
> U
Q C
� = d
W c u)
• co
U 5
Ur U
O 2 O
Q .5 Z
W
H
< to
o
>- O cn
0
• •
Suspended Well Site Inspection Form 5 Year
Notify AOGCC Inspectors at least 10 days prior to inspection to allow witness
Well Name: PRUDHOE BAY UN NIA NK-11A Field/Pool: PRUDHOE BAY/NIAKUK OIL
Permit#(PTD): 2020020 API Number: 50-029-22789-0100
Operator: BP EXPLORATION (ALASKA) INC Date Suspended: 2/22/2002
Surface Location: Section: 36 Twsp: 12N Range: 15E
Nearest active pad or road Niakuk Pad
Take to Location
Digital camera Map showing well location/Aerial photos
Brief well history Wellbore diagram showing downhole condition
Latest Sundry or Completion report
Past Site Visit documentation Site clearance documentation
Pressure gauges, fittings, tools Sample containers for fluids on or near pad
Condition of Surface Location AOGCC requires:
1) a description of the condition of the surface location, including discoloration, fluids or sheens visible
on the ground or in any nearby water,
2) photographs showing the condition of the location surrounding the well
General location condition: good, clean active pad
Pad or location surface: graded gravel
Location cleanup needed: none
Pits condition: N/A
Surrounding area condition: clean
Water/fluids on pad none
Discoloration, Sheens on pad, pits or water: none
Samples taken: none
Access road condition: good
Photographs taken (#and description): (3)well house and behind row
Condition of Wellhead AOGCC requires:
1) a description of the condition of the wellhead, 2)well pressure readings, where practicable,
3) photographs showing the wellhead condition
Wellhead/tree/valve description, condition: FMC wellhead, CIW tree, clean and functional
Cellar description, condition, fluids: back filled with gravel and clean
Rat Hole: N/A
Wellhouse or protective barriers: Yes, well house good condition
Well identification sign. Yes, correct
Tubing Pressure(or casing if no tubing) N/A SSV closed
Annulus pressures: IA=310 psi OA=260 psi
Wellhead Photos taken (#and description). (2)wellhead and tree
Work Required: none
Operator Rep (name and signature) Whitney Pettus
AOGCC Inspector: Matt Herrera Others. ers: Ryan Hayes
Inspection Date' 7/12/2015 AOGCC Notice Date: 7/8/2015
Time of arrival: 10:40 AM Time of Departure: 10:45 AM
Site access method: truck
• •
✓ II
E
L
1C _ •lC
✓ L
E d = d o� W
v 73 ° o.
_ 0 r ul 3
cu 2 .
Eli
's:. r, Q Y � N *T.
co
a To
o vi
N c_ y Q
O n ci a
— Y i
z y — c
f1 w
OZ ra
co— QaQ
a
V) lo
a0 co CO
d
Y Z i.0 a z 1 O
yym `, tJ
z o
H
co '9
a
a
a z
A m
a
Or
g
Y 6, •�
Y Z '/ a ,, . a m
z +o In N 0) Z m
H
Z .1 Z.. Y _......-^100.. ...,_,..4.11 '' ch a Om. ani
Z + ,#t'4 J int 5
AO...,,,,0/. ...,
ra• ami
Z °'
N N
,•°°°°°...°. /
m w
0
C o n
N M co
w
n N C
_ Q ,C CU a1
" _ '
z d
Gr,- - `� + �_
.-.t' z G g
ap 4 p ° C N 0 Cl o y
Q. o o `" h m
ti O Y G - , E d
t r' te0/0 J 8.
z z zZ — zH
M d m
4" 5 _,r ).'t �,
if d m
Z L"c
0 6
Y 9O Y !'f: c
G- Y F.r" Z x
CL
S C
/ 0
m / m
? /f o
a: CJ v o.
,' y Y y CTI
w
L. O 4-
‘
, N
t J
1 a ,
0
4
z
co
C1 /
Y
a. z
1 } M
_1i P f!
O
30 c")
J Cl
J ro U
J V
D
d
m
.,,./
. . .
.• .,.,.
..., ..,...,,..
.. ,
• ...',. !.,
,
I
. ,:. 4,.1-
J.V,. 4.•; 4.. ,,,.1 NOV • ,„„ ,,.„:t.
,. ,..J... '
... ,•',..,.',.,.!„,';,-':•:,,::,:'..'...:.„:.',,,
..
t
......-,,.....-.i:.,-i..i.i..,,,,' ,.
0:4
-'v.._..:i.'..',.,..'.,'.'-.-.:,'.;',.4..,•'i,,'=:..._„.i'
7.-,;.:'..'.,'.:',''4...t:.:1,:,':i;:O'.,--''',‘.'r,-,.*.,.-...:...,;.:'-:.Li....-,.,.3-.tr-7:'.;:'.-:..,;:'.,.•,.ur",..'....,..t.,..:',...„.•.-..-,.,7'......'.„,-',7_!„-,.'_,.,,,,,.,....-,,,
i
- k -•.
• .......,.#,2•.,.,'i,,',,-,.i
i...'-1•14:. -'4;..4*
:. * .4. .'•. ,.-.i-,-,i.,_.-!.',
...
,•i4ir,ri
'-l
•. ...'..,.,,,-..:::•,..4'_:ii,,,Ai'',:lj::`,-;*.v:,-1",7:.1.:•?••:.,., i#i',„4,,,,7i';',.1•:*1;if.g,;•:•,- ,., ,. _,
,,,f Tok..-', 17.••• -.'
31. '111...t41:''...'. , „ .., , '' ''.-'''',-.'2;-;:.:'''';'''',,,*t,.::.'''r4*':':-'.,*i';"-.::-, ':':fl'4;f:''''Ijj':'i:c'':'-':''''''.':':'4'Zf:;?'';".'1?.'''::.'.'•'.,:•-;''-';',:;',,,'-;'• ''''.. .'"-1' ' ''':'
,. .. .,.....
,.... :.
... .
.,.. .... .
..-...... • _ ,
. .
., ,1
-..,
'''','i ,I.Virk:• ,.,,„..,,,...,... ..,.-'...',•-•1•-•,,,,1,..--•...;;-; 1 __,••••,11-..i.:!,;;;ti,sy",..r.,_,,..1,.#.:21,,•,,,,,,,,.::,,:.,J.- ...-.:-.......:1,i,„ ,.,,, ,,,,,,,,/,
,..„,„, .,..„•.- ••,,
,• ,,,;,3-74,1„litil.,•,... i,
#
=#!,,,..,.--r-:e 1:-
A
, .
, ,
,
1
1
, .... ,. , _
. ....„. „ ,
.„, _ „...
,.., ....,...
..„, , . ....,,...........
... ,.-
.,.......,...,,
, ,..
- -- 4-
4
i - --
!:,. '. - . ii- ) '-
„ .
.. . - ...,. ...... ..„.
..,,J.,...„...„........ ..4
„,
iltspw ---.. ,2.-- .,z-i,.:,---!,.4,,,,..!';.-,--.:-:;. : . _ ' i -----,-- .-'.'' '...' .
, . .''
.., .
..,,
..
14.1..ini ' : ''t ' ..1.-."* ..,, . .,..... „.{...s , . .....
...I.,.
: .
....
............, . ., .
,It 4,,,,T.,0 ,iintiow 14
' -•••,.., ERNI -
S.-
,J., •
q4
'i,:t11:'
,.'4,•
..,
., .,. ‘' ---
: '4,,;-',,,I.,iO4•41,
4
„... . . .., .....,..
. ,..,- ,„,...,,-, .... -;-,„,,,,,,,,„ ', , ..44,.i!.• '-Z. ,..,14.,
r: j
. 44--, •
;•-::..”,.. • A'4•”; - '
'
t ---•••.1:
•,
: .
•.., ,,,:::,r•,j.,11 ;,..,!,'N.:.
..,..
•
'
, . ...
? 1 '
•''. •1•57*''''''''''C'''',' .4.,'.k.r•' .,
.,4',,,,".?.•:,..*.,
,'
•,,
--,
..
....a.•_
.,
--)-
.*)::.'0%.,,,,...:.:„.1.••,,:-*,..-,.'.,...-."i-
.,,.
,,.
.
*-
,..
.!
, 1A
1
(1.
‘110i6i,'
--',.
,I..-
‘.
:
e\ 4 '
t ' . 7 : ' ' '4:
ffi,..•„..;..-..•:.,.#.#:.,,---•.-*•#••.#J,1.%,... 4...,•:...,,.
..*#-44,1‘,,°•rA0....,.,,„ '.
...i ...'.,'.-, ,.., -..,.,,..,..•.,i--,'
#, ' . ,'
; , ,..,„1:„,c41.:',,-:,•„,•,,-1'
...,:‘,..,•2.e.--,... - -
• ;
• •11 .
• ; .•„''' ','' ,. ' ,'' ,',`I. fi. = ".0 ,,, ...
,• , .,
• ,., ,,, ,
"!,to::, ',1,,,,!.,14,' .. i; 't., . _. ' • :', . , :''','•'' •',.' .;, if:, Ve,'t
s;:iiiii?",14•1t,;•'.„)If ‘' ,II' ,, . ''''i, '4,0'' ', •I''''•*' ; .;*," ' .;4''\',f", 1' '1..1'
;.;,.V'...10 •'.t.it', stes!''..f. 4.,‘';',444"..4;%•;', • ,,, ,".',' •.- .•. . , ., 1' ,„,,,,•, ' 1
.t.,..,6,;,4, 4„qt.,,;, se... ,,,„ik.„1..,,,. „rt,,. ,,.•.• , ,: : .,.,,.•;,... , , ,.,...-,,,,, ,
.,:,•„,,,,,l'. wk.., k FA` • s . .1% :""•'
1 4.
/iill' i.,4,.-41. .ttet, ,),04..‘42 4,1" •'''.:.-i% t.:V. ,',..., . : 01
it
4. Yk''
ii
•,,, '' }t,''`*;*.,',. '. ;' , ' *f.' 1
'' ''''''''
.1" t;,...•...-'
4-"eil.„,p,.*•rkp; ?..;494 .' ; '• ',4''). '''' oi. ' ''''''4.‘;,'. ' ' ::'' ',Si' l• 6' i
( ,
.*=4.•.i. ,,,'' :C., I .0.4-4%... ., . • - '. .‘2.7. 4,•.•'•"'''' V•i'-'g., .,,-:','•-2', ' !,:'•;',„. ' - 1 1111
,.- 14,1%.V,I, ‘,1,,,,'k,\,,,,F,`:., ' 0)..,...• •..,.-•••,' • • •,,• -4 ,,••."'.f(•,-.I. '.0..- i,I,;-:; I
411,
'' * i i Pti,'''•44k1,'•,.''',, 44'.1••=4`=•V."; ''' ''''''' 'IT'','-g.,7•P' ty,;$, YI, ,it.'.2. ; 1 '
to
, ....;„„i231,34,., ,. •,. ' .,..._,,,,„1. ,ff ,i.., 114,. .„ ,.ti.;,...:. , , _ 1,
;,p; AC',, r',1,:. „,.. , , • .1.•!: ,,,*,'
if.% ,-„i.lf.fligt, ,,,..1.,, e,,,i4..,;,, ,.,,,.„-iir. 4„.. , ..-,,,, ,,„.1,..tol .,,,,,,, 1
,.., ,.../ .„,.. , l, ,!#,•*.4‘:.#1144P.` *1 "'f''' 4' ''''Pti -'4.1' '4 i•
•, ,),. :1!'V'.4..... '.14..'k'.,'t..•••';`:i•,-..=1±,,,.:1:0-;',c,,,:•.• ;:.,?0,t.".7:4,;'4' ,-, 1. ' '•44.•41..v.,1 ya•: "tl'A Vi ,j'' " •
;1',., 3§.1)' C ,,1•,,f -, . ., .,;' iit;,..1- Of.'
, ,, .,... ..e.:,.. 1 ,-7.-N.4 - .•*''' - *.fii5•Y' ,C, ;1* TT it k
9,1!'' -,' AS' ' ' '''7,•,:'' ' - • , ''e:Osii:4) \... -,,).'.Yik. 'P.41, tXt•' -Ptkl,:.c'
-...*
:p.,'•': 4',--",-,,,,.,:‘,,l•‘• , .'it•'.%•'.!••,, ,.4.(iipi.,4„„3.,•.,- ;444.1414.4 i,,.'•,.h.•'''',)'. `-- , ,..,„.• 1
i k
, , ••,,t0,7• . ..4 • •Nii,r4,,..; .",..4 4„ ril-r,-.,•..A 1,lqi.,,,,,iriv .,-.4',,it,'.,. . ,..--,,,, - '
i
— , 1 ,t, , :-.„.,,,; '..,, N)-ititz,,,.. -..zi,i,731...,T,.. ..,-.A. 44.4. ,:o• -,„..,••,,,..y•-,-.;',..',,‘,.--. . , , 1 .
, •• . ...) , ..) ..••• •• • \•,,.,. ..0„.„, , „..,,,,,,i; ,„,- 11.10, ...`,i't,“;,,!..'e• ' ,
.4./ , ,4,,,, ,,,, ., ,, ,1i. , ' ,q P,''' '4." 4-ltg.' •,•"6'.'Pilv 4*' ' 4"I'it'Y' , .
••, ; ,t?' . '.., t.1 \ ,c4y, '.r '‘,.,1'' 'PI"v1:4„.ile ‘,4',•,-.,,•:•,•,• •
?•,, „, , ).... ., . ',.., ‘• • :•• ,,,,...ki,A.-7:,144,,, -...,J-, •
. .- .;;0..'' '.;'04'4; ,
I r
. ., : ,; )•,:io t„„.,,,;,,,,A,,,,., , =. -.it. ,.4,5.4.„0,114 ;.;•'1,,%.,,,.=,,`".'s ill - '
•.t'. • • •• •../Ay::•••-•••..q • •• fii i...i --, ' ''.:i'''''.0"l' 1.1
' i
$)
t ) •
- ' • .' !'st,. -'le:-i)1F.9 ,:. •-.'' %,*ti.t.tilt ...0),... 4. ,.„ itf:4' •,)li, .
t i•...ai'i.,v* '
G-
' , . ) ,t.' t ,.. ,, t,v..., A.,y,if; l,
it,,tiA
, ''.),`,.,54.'
,,,, ., - , -,-;- , ; -, -,..,90.:0 000 t ', ',/.,4:= '''•-• •:,,,&,r;,,,i-,4)).s.,;*4 '
14e0,k1.1 ''•• ',- - `..,:',,t,,,•0. .) .,;_.:.„ .';',V,) -,&V.,>,,.).01, ,,..'.: 1,,.if,t,t4t444.4 -.„-'. ,,, .., , 1 , ,
,,- :': .. .,,,,..(t)':.fi.4s4k.f.XP• "#,,,,,,liWtt$11":14.Vg14:4 ?31/4 '',,r`,' ' a '
'41*ffv,t.,y,,',,'g.,"f,.q..V.>i1tt".,ili,.,tt„y...,..„4i.",l;) .,.•,‘ ., .', .''4-,-.1• '•,,,,,.,,-,',,..,,..'-,,,;,A,•.,'')'•...,(,i1.:,'i,,.p0n,,•f,•,Ai:.•,,. 74f ', 4...A.... ,t 4,;f':,„..,,pg4.„-,f--r;„.,•1,i,• 0.";`.qif,'.i:lf.,Ai-e,:,,i,i,!r,;4••3r,it,,.,t,2.,vt,,,
44;:, _,
t1,'
„ ..,.,,,, „41.:„.-1,-, ,.
,. R., ,,, , , . • ,,"•,,:.• ,;,,, , /,,,•;,,,,,,-,-.. :,:', ..t i'; • ` .;,f,..ti,..."-,'4iY41'..-!,, '. , I — .4.--
,-: '.., . , . '
1 „,.....
.,,k ., k, ...„004,14;y4.4;;,y'',.i.t..-', .
41,.:4144,*1 -.14,• ••4:‘,4,; -,.P .ti,..*,,,- o :44i, , ,,,,:„ - , ‘ ..,,,,,::, '4' i,-1•••'!..t•f4wq 4. Immix •,' 1
4:'..1',:i0"i;1;47-,--,),,,•.'4 4.04.49-4-po.:, • i,,,,,,, 4., , "1,11, .• , 4-, „•0,. r• , :tv,.4.,1.. , .
'0Ao., ' ,. 44'4. •'' v.,- ..,41,••••' 1..,..4k.,,,.1"..=•,)i.
,i 1,„...,. ...0,1,.,,k,,4,•,„„li,,,, ,,,,, ,„,•=,,,z,•,,,,444.,,.j41.1: 4,Ati,,t,,,,,4.4-ii,;•„,0 4,,,,,i,,,,f.,•,,'-, 4,,,,„,
.4"i; tt, V s1
ft
• 4t$tf, ,' 5!',' *it'ii•it,14,0* '''n 45"4 artViter ' ,,e.::. itil#44 ,-A-4..".',':•;trAr-
*4' ,,.., 1,?..- ''',4 ."i .:ess;.'.g',4%, 4"et'5111,,..• ,.,s4/A1-pit Iiiipi:. ..!„-I-',„i5:#•"'i''.. '74,': ' 1 1
4tttlt.41,44 ,,,.;FIV6•4;*'''14:,t,t''',.1' ,iltfr
1 f
,-,,r* ,•.t.V .,f,, 3,1,,4,";.”,,,,,,,, ''',•;
*Ityi.4.,...z.h.4.1 ;44' :•'-••t,' ••,...,,,A,ifj h
44.., -'1f4 ' '-.,•- ,,P,4 1 ' le 1 4 , i•-,tY A ,t•,, ,.
„,. „, ,41,,,,,4, ,,x1" '!..fat.e.t.of,i.•,,rsr,.:11,,P4,,,..%;,,,,kt,,•14 1-.=',
(4,
.,- ;# ‘,".....0p,, ,,c •„, r74,44„:14,,.,,,144,5", , _,„...4.,;44,, ,k. 4 7.,./...,76,
" ? 4"pf . 4A. ov,,,,,,,,iii:4 4 04,,,,,,•. i.oi,,,, , •411, ‘ 1,: -,. 0171,...241,.,,
. ,11';40/lilt itA ep',' '1.,, r'' '10,,ki,f14$1t,.#10.f74iftil*-,;,l'^'S;(tr';'0.• ,....;i:,.C. ' t I''.4 - . .: .
i
7,1141eVq_lArSifil,14,=0:6 f+ , il
4itioed
44 , , _ . ., 4 4,,,toV V.•14.•••Ai • .t"'4401,0, t'il,',..1 t. 4"4" '44""Ar ',",,,,•
,il ..4i:•4,*, *".•`'S e'R,'`,` i,, 5 r•X'41,01 ,4 ( „y. 1 tf giffi 4i , ....,,,,," , c1, ..:v...:
.,,,, 1,i- , , -!:114.41,,i, .4",,k•.•,',7,1-1.•'-,,, • s' ;, itT'
$7 y ; •%•-:.ft 1,*tv 4,i-it .,.. *VA,/,;..11., ,f,'',0')=,44,..1iii,.-,ti.tikftee 'It- '4.•",, -.."::1 * r n , '
IP; ',,,p, 4)1/".,-- '1 .1:,?;',..4":"I' -1.:10',,‘,.11.12f.1;Pc 4.igittlii--ig'--14e.i M'''$,
.1 '4L1,"`0`tY' ' 4fil.J'. .'fi''','') 11-0. ' tits ''ZtVIN*44
, .
;
,. .. .Ali-,,,t,y; 14 .„„ii...,C14 , ii.k.,,,,,, -,*',
I
.,..„„_
, • 117, s,',,1 .. ler i PA r'o.,V •- ..,1 ,,,,,,, .,, .1rA'e,Y? 4,4 tefyi A. '41/4''4,,"`,"4.,‘",},,•t.,`,
I: 1)(,-.); i,.,J,4;:r , , , •ir,,,,1 I r.2.+,11t12.4
; 1111111 4-
oftylig. k' s 40t, }!, kOMPitkit.i41(i4.410#:ii.*.`41gitki '4' '''-i!0•'i,ii Y"„1 *
)
;.,:,*;',WX,,,k4, . M 't* '`,sfro,,A`1,,,,41,i 44: ,4*titt„!•,;:r!,„:9,1tirVilitii#,V4Plqi,''"0.1i",li.-I.f',.1* .'
7•1''''';ifi4,f,5 # '''' . .''''
I''''',
,.. .
.,
/4
,,:y.,,,,,„,,,,,- ,AVOlgiik:',,pty.4174;4;,....ir •,,,,, •
„,,'"...xxkl.'•”.y7 1,Aft/':',-,#- ill.,' ,0 tt/:rimeiti7,0),,es,t41,0,,kr,pw,p4.4,,, , ,
., k,,y,,,,, , ',t. ••• , 4, , .,,,,,,, ,,lit,VAY:;'API't...!'Cii:/'
1 ..
*31,',e,Tityr 4ti,,,, ,.. •0417,•'4.144.0, ,,, t •,11-1l,„, .",• ," 4, •
•.,--, ,. .
4,•''' 4 d 41V A;.';•/"1,1:14F.'14)'''.'41.4:541t44,1404;4!g4!4. -;14 il ,, :.
',.1,*is-- '. 44.. t',. :4'-4 ,4,..r.,:,• ,•;„ • 4..,,,1,,,14....A.,#40,.441,,..7.42,,,,,,11%,,,:riiks9Y.',....t :.'-t'., , .
.1"ti '14." tt • ,i,'".., IPAct,,,,, ,,,, ...4 qi:,,,,,.%4 41(icit,Avi„,A71,1,;,,,,e14;,,,41,4411,, f4,i,,, ',
,i614P4.4.,A1,1,:' f4(AIT4 cr;.‘•.`,*', ., ,
- ..
.; g..t,, jim•ty,: i ,,,,4;,tr,*1.;tte.14..rv..f.:
i
--it,
yr we. t23...,,, z,, r4,,,,,,k
',,Y).ss4,4r ,/eri ,.• 00.4
*14,"*A 4V `*'IP'•'47 '41 f): :'?''''i:f41;g:e144'1,;)?fririiii*,.,A.;`:,;:,:'::;:e.it:t(iit,I':4',%, ,
.410
. ,
.g,.. ,,',..;,,44,," f'4."4r,,, . t.....•4..s's'Ai....1')PT-kit4.14,..i4;4,.- ',
. (,..,,,,,,i...„ ,,• ,,..i44.1i,wy..,q,'„or."..!.."1.t
)4.
. I .
'1, f•.7,1 .C,)14'1.,'!,ii, 4;'''f:Nrg,11::''Is' t .6 '' "
.....„...
-.,.,
-IP
. .
,., .
. ..,
. ,
rt
, •
.e.. - •„:„,;., -.„., ,b,,„
, :, •,00 ..„..,
.. , , , ,•••-•. .,. .
- , ,,.:.- , ;-• ...-,1,}',4.0,,
-,,,'.,°:.:,..•....;'n-1 i'4'n'' '
it\k• 1141*
• ,--,. ;,.'i3. ii",'
. •E;;;";
fr.
,, , .;-•;,!,',;, It , , ,--...,-., '
-.4. ;;;;•.--; ;',"V;;1;',' 4. •-• i''''•-1.:•:.... 1 *•..„:, •
.. .
-...-.-„,.„.7,..;117.,,,t1-..-i.'7,:.'74:::-••••-
, -- , •,•ig ) 1,--I
... , :
. ...,..,.... ,...,.
. .
. . .
_ .,..,.. . . . ......
...:,,,
..„,,,,;..,,,,...,.. ... . _,. .....
. .. ...,„...„„,...„.„. ....... ..- ,,,
.......„,..... ._,I,,,.74,',7tf,..',',t. .,,ot..t.7,tfti....n:•ni.111'...i.,51,5!:'InitiA"
n, f:**Iit44r.iiF4.1fMgkl.,10,i1 f....P.Fi't.';'4,.....•3'..,il.,•4 t
. . .
tt### 44'44',/ /
,
I . ;„ta,,,
W*1°7', „,, .•
''''' . , ,, ,LP•ooltl . ,1,;;l. _,-- --
. .
f ..-, , ),,,,,„, ...., .'.'4,m.;•,,,,Wh.14,1,0 t -ii!.1/2 ,,';44,rt.'',A,•",: ''..:;,.!...:',,,,,,„' t. , '..-',- •,/,' -----t.,-- --
(•'''.....it
. .
.., .
•..,,,,,.4"",,9”
, :.:'1'!,-.„,;.:'',..,;;•.. ..' ',.,,-, .- . ,,.i. . - . . ,,,eY. 1.- ..,''',.'s 74'. ' . ' ` P'' .„-"`-`••';•!-."'--";';;1';',Y,'"":-..';';`
: „,;;;;";!;;;'3*-3';:;:- ,"...;. -*';,',',.;, ;'.'",i;;;:i!.44-4.i.," *!;;:ii. - --'''' - .;•---:-.";--:-'.;-.-' ;;:--"---`•`‘ `-'`-',1- - -* "-- ': -Ir'32--,:,;;....'!,;,i,'":-.' k, :J 0'00 ...;?7. ; ,.,-;;1;•,,...,-',....":,;•-; ";-
;.,,•-•,, • :. ,.. „ . ; .-„..,;.4 ....- tt.,.. -'•.• .:,...4,•.:*7p,.....„.,
.,..4.,,;.•..1),,: -.4--i .. ''',-.-1;, -,,, ' ' • :'-tk,'," -.:'`#..:'* • ' 6•'''''' ..ttP;..' iji.''-'`: ,:**--'.... ' ''''''''..:' tt •
..,*..; '; • - 't& ..'t, , 4 4010 ,'A b y a. .., '•' .:ti.1.ittlt':''''..i;AdM,.' :, .!''''.g. •
,,,*. ,4 -- .-—.... t. .,f, . ---.' *:-; ,..- •;-'t7.,6,.*Iii ' t., *
1,I,. .,., . .t.,-,..,.1 ,,-,-,..-4174„41461:ii. ., r ''';'•7I.,•••"'''..' ";'; , ,,,,..., ,..r,..4c,,,,,.. ,,
g , ,,,,,, ,. i; l'••:ill''
,,ti!kin'ttin'ill,.'r...'..n'nn'n..'t n ft.';', n'""" ; n I.,• .;,,*,,:n/fn.,-%.*:'•.4-7.1:;n • ' -''::' *'4.4.t.% ---;,„ . -.' ;
:„....4"i',""e',",,,-,-.1`;;;,,,,;;-.'- ; • '';
_... i?$.':"?.:A;":
*, :. . ,,r- ' 1...,c:r.,.....--
1..•!''''',',1)§:1;t'! ,,N 1 : +-,.,,
147:: ..*::' I
,•
•
t t
411,,';',„t..",•;etit n' I°'n' 7 • n `• 1' 4
f 4
,I ,• 0 • I
•
. .IF.... . . .
.:,,r,,,••1•,•'4%A'.,,•'••I ;•.,'''',,i ,
• • ,•,,, • .,„ •I•
,•I'..:•.',!•••••/'%••• ,tr,,I.- , '
,:,
, ,,.-_, ,
4 4
k
... ,.., *; .
1
t
44' .
' .
-. , ,
,,,. ,
'i!'11(:',.,
i.
,
. .'
,
,
i.:' ?.:'°1'
, ,..... -4
- { • 4
•. :
,,:,:q.';11: ,:11'' ,. !4.. 4-4, '•
:.• -la ,
t.„,• .!t
. .
-- .
4 .. i ...... . ..
. ,
. . .. „.. , ,
t
-,,, :...... 4--
,
. ..,, .
-, ,,,..,..,,--,,
''c'r,"
.Si•
, ...,,:' - 0 '..i.--c \
°,.
,. -,, bib, .
• y
t
i 1
ill A
,fir+'
1111111
'r*r
.
., ...,A,,, ...
. . .
. .......„....
..
,..4„. „,„. ,...„ „ .,_...., ..
., ,,,...„ ..: ,.,..,..:,:, 4
5 }
J
I
4y
4
p
" r k
ip R
#a. ,a
r � .
..
4
a a h' s
S L.
S
4Y r a
m„.te n LL
w
a '
-.
n
. ,
« 4
'7
' .
' • i ''1.ff.''..,,,,,
• 6..''
• 0 . f. . , ,, -: . ' 'II: ', - 'i" I
1.. ' •
• ,
^i4 . t r • '' : . '.... ' --;',1,4 -
liktio
4 ' '''' :3.^ :'....:•":": -
.,
wN1E/RVELL: NK-11A
0
..,
API NUMBER
OPERATOR
Prudhoe Bay Unit ..
, -i • '
BP Exploration (Alaska) Inc.
50-029-22789-01-00 . ..
..,,,1.4,,it...t ' • !fr. ' ',:-: ,r..'40, , .t,,,` -,-,0
krikt .
. . ... ,.. .
4,
SUR. LOCATION SE 1 4. Sec. 36. T12N, RISE
DRILLING PERMIT 202-002
i ..• ib' . , ,, .
..... -.
'I'..- ..
' .
-
f ' -•
, ,•' . . -.
i''...3'.'33`,. . . ;twos: l'*'::* - ' - ' 4417•-• ' " ' . 1,-2'...-"-:-!''' .
i ' I' )k•
:„.--t• :...,•,„" tt• ..1.-..,,,,, 4,-,F--,.:,. , ,•;„,,,t,,,,. ,,-..•,e!..i•: •• `.3 ,— ' ' i , I., -''' t • ''.....ie
•-• _,,..,*,,,, - ', :tor. ' • ''" ''' --' ,; 1 . ,
•
':,..-: ' :Pik ',I's" 44; ' t',''' '-1",' ;'' : '''''
,_ ., • :v.; t' '" - ' . ,..:-:i.„ ..- -4 4,1,.::'*;,,e:',:*:.'; „,:-.... -.7 ' , :,.411
.‘ , . :t.” ' 4*.' - . '' C .* ,br ' .1‘,,,,,, ,..*t. • ,,,.
- li '1, ; .:''. '"'.. t''''ri", '''-.4'4,.'-',z.-....4t.,it''** ''' ,"*.i• ' ,,, ,-* p,',..'' 4.,' *;', '''',''
.isimunim."1
,..-
_
.
'4,4- '.ir. ::.','''-„,: '0'4, „' ''ill'' - ,,, ,;.-,7 ••.4 VI- i'••••;. ''tr•-. "•,,,,, ..., <O.-,. :
,:-.--• . , t' tk„. ‘,- ',..11,;:e ,k4t., 4 ' •' ,,4t ,,',,,,-..V., ,.. ,-, ,:.T3,4*.'4,, :4+, r I,i:$j'i . .:
-V-3---3-m". ' ' :',..."
.`.',.''-,.
:*-
*.s.,,,,,,p.c.,.,..i".4,,.......,....t,
.47.046E.,— ,:4001 4
., '‘
a
.-',,,,
!:t......,,--..,.....„,,,,..._,..- ....,,,,
tOttr,
2"4/04117`
:*. -....`,;..-....P0:.--e-.....,-.,
,. .,„?.:,.0.‹. .. ...itt....
.1.... --...... -,...;.; '. . 3„;...... •
")i,
i 1
. '.. , ;*,.',**:*."'"3.'
.,: •• -,,. ..z.ggsi!* :'-':.71,:.:-.--''..01
--
-
i'';.--..L.f•-...!:!1;'' 41."« "' '''''.:%1''''': '!•:-..:'''4.,'-'''1*,N.,''' 4',,,t,i,SA2;,'''''''' ''''`,''t,TA-2,..-7,-Vr1.-.4 Y#14 ' -,'ff i'lvtf. *4,1114
"--,44.-4,!,,• 4.14, % ,' -.:4.4 d ,.:0,-,,, 7 ,,,, - .PZ-2.44t4:raP., '.r...'%';'''.44:.'"' ' "2 --' ''''' • -e , 4
0"; - *-'7.•: -..-.:-;.)P. '''' '.'" i'' 4.iit:,.1..,,or.`. .:44,,, ,*--. ' * . ' - ": 74 :: t'''' 1 ''‘.. - ... ,4,.
,",...,.... - ' --',..: c. ' ,: .,.• .1i Lt , -. , „. i, '4,1•,,.., ...--,' .,,,:. - .
441—,
,-,
,-'14,,;,,a,$-,...-. •,, ..,....„.•,;.:: ..:::',(;.- '-
,,„,t,--:-...4. 0 W.:*iiiii,*' ' .4,,, ' •4,-4...aii, , ,t1 _ ,-7 tft i. ', ' • -- '-40,..4^.1.,,, s
' • ',,,fi::: ,J',.-, _ ,.. :,-4 4.,..r,»-,,,•,..1--,,,,. 'NP ., ..100,,,,
. -,_ -- •s f '' •.. :lt ,-.") 1-t,* -t:".!,'17,-S., 0,..%4L.'.-•tr, --41.. •-I•:'
•,
• .....
— ' .•:-47‘...,‹.,,.. ,•. .tit't,74: 174.ii,•-t..,"......'';'' ' --71''' '1 -
'
' •
. , ' 4 .. ...., ....-. ..,-•
r'.. . '. •
'
:'''''''';'•*14-- ,C.;,•:.• •it:s.: -,*`.";"14"4*.'•:.'' 11*::
- , -
.- ,
_.. . . .
.._„?...,.. -;.,., •.•.,,
- ..0,..i.,,--,,...------%
•
. , .
- .
, -
- :.-. - . , .
TREE . 4-1/16"5MCNV
•
WELHEAD= FMC
• ACTUATOR= BAKER N K-1 1 A SAFETY NOTES: *WELL SUSPENDED W/2227OF
KB.ELEV = 59.81 4-1/2"12.6#KILL STRING.3.725"ID XO PUP
BF.ELEV = NA UNDER TBG HGR WELL ANGLE>70°@ 4744'.
KOP= 2450' NOTE:PRE-NK-11A SIDETRACK WELLBORE NOT
Max Angle= 76 @,9994' SHOWN ON THIS DIAGRAM BELOW WHIPSTOCK.
Datum MD= 17649'
Datum TVD= 9200'SS
4-1/2"TBG, 12.64.L-80. .0152 bpi,ID=3.958" —I 222T I
GAS LIFT MANDRELS
Minimum ID = 3.725" @ 31' ST MD TVD DEV TYPE VLV LATCH PORT DATE
XO PUP UNDER TBG HANGER
TOP OF BAKER TIEBACK SLV, ID=7.500" —I 7610' I
9-5/8"X 7"BAKER ZXP PKR,ID=6.276" —I 7618'_I
7623' —I 7" RS NIP, ID=6.188"
9-5/8"X 7"BKR FLEXLOK HGR, ID=6.276" —I 7626' I
13-3/8"CSG,68#, L-80,ID= 12.415" —I 8035' Ha
7"LNR, 29#. L-80. .0371 bpf, ID=6.184"
9-5/8" CSG MILLOUT WINDOW
10699'- 10715' ( OFF WHIPSTOCK)
TOP OF BKR WHIPSTOCK —I 10699'
13165' —I 7"LNR,294,L-80,.0371 bpf, ID=6.184"
iemimmingi
7-5/8'HES EZSV 13167' —17" X 5-1/2"LNR X0, ID=4.800"
9-5/8"CSG.474, L-80, ID=8.681" I
TOP OF 17.0 ppg CMT P&A PLUG —I 16812' 4111141'fff13799' —I TOC P&A PLUG
1.../..**14
44
4 14‘14..1k ,
4%
1000/04
PERFORATION SUMMARY
41111111kIlk
REF LOG: TOP OF 5-1/2"CMT RETAINER 14100' 410kiitIN
4144‘0111
04,
ANGLE AT TOP PERF: `111014001%
Note: Refer to Production DB for historical pert data Niktik141120.14
`141q11,0,Nti,
SIZE SPF INTERVAL Opn/Sqz DA TE `1141111411011q
44414
N48110114
5-1/2"LNR, 17#.L-80..0232 bpi, ID=4.892" 14958' ./1414-10-001k
Ntil,h100.
NiViv
OH TD 17866'
DATE REV BY COMMENTS DATE REV BY COMMENTS NIAKUK UNIT
09/09/98 ORIGINAL COMPLETION WELL: NK-11A
02/22/02 RIG SIDETRACK (NK-11A) PERMIT No: 202-0020
09/08/06 CS/PJC TVD/MD DATUM CORRECTION AP1 No: 50-029-22789-01
SEC 36,T12N,R15E13111 NSL&1021'WEL
BP Exploration (Alaska)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Suspended Well Inspection Report
Date Inspected: 07/12/15
Inspector: Matt Herrera Operator: BP EXPLORATION AK •
•
Well Name: PBU NK-11A Oper.Rep: Ryan Hayes
PTD No.: 2020020 Oper.Phone: 907-659-5766
Location Verified? Yes Oper.Email: ryan.hayes p_hp.com
If Verified,How? LAT/LONG '
Onshore/Offshore: Onshore
Suspension Date: 02/22/02 Date AOGCC Notified: 07/08/15 -
Sundry No.: Well Completion Report Type of Inspection: Subsequent •
Wellbore Diagram Avail.? Yes -
Well Pressures(psi): Tubing N/A Photos Taken? Yes
IA 310 -
OA 260 ', AUG 1 9 2015
Condition of
Wellhead:
Good,Gauges operable
Condition of
Surrounding Surface
Location: Good no standing water or oil sheen discoloration around well house or in cellar area
Follow Up Actions
Needed: Monitor IA and OA pressure and visually inspection by Operator
Comments:
SSV was closed. "
Attachments: Photos(3) REVIEWED BY:
Insp.Supry 0734_ £(61,S
Comm
PLB 12/2014 2015-0712_Suspend PBU_NK-11A_mh.xlsx
Suspended Well Inspection—PBU NK-11A
PTD 2020020
Photos by AOGCC Inspector M. Herrera
7/12/2015
.
GI
WELL:
NK -.11A
OWNER Prudhoe Bay Unit
OPERATOR BP Exploration (Alaska) Inc.
API NUMBER 50-029-22789-01-00
SUR. LOCATION SE 1/4, Sec. 36, T12N, R15E
DRILLING PERMIT 202-002
,
te
f
i . ,,, ••0'?‘„
r_,A,__,
- „n1 j R 4 r
if! , 1
d
, • , ii
f1 t
i f ir 4 ' .', i f I i ' _ik 11 i isiii
4.
1 tiF ".
,4
,.,
2015-0712_Suspend_PBU_NK-11A photos_mh.docx
Page 1 of 2
•
r`
y S
41*
ISO"' /..)
O. - - r
, •
, ,
.. -':' .., i
t ` L �.
10 1 ,
• R
•., _ry
,;l11ri f.`A i R s s 3
+.k.ms 'r
•i h� , It - Py.� 1 M w. ` + yea +i° A �;>YR ✓ Ott `. � ,s (0. ,:..t y% )
2015-0712_Sus end PBU NK-IIA hotos mh.docx
P _ _ �
Page 2 of 2
Ima~\;.; )prOject Well History File Cover ~ge
XHVZE
This page identifies those items that were not scanned during the initial production scanning
phase. They are available in the original file, may be scanned during a special rescan activity or
are viewable by direct inspection of the file.
a 0 ~..... 0 D<1 Well History File Identifier
Organizing (do",,¡ D Two-Sided III 111111I1111 11111
RESCAN DIGITAL DATA
V Diskettes, No·4
o Rescan Needed 1111111111111111111
OVERSIZED (Scannable)
0 Color items:
0 Grayscale items:
0 Poor Quality Originals:
0 Other:
o Maps:
o
Other, NofType
o
Other items scannable by
large scanner
OVERSIZED (Non-Scannable)
o
Logs of various kinds
NOTES:
BY:
~\
l~
~ Other
DATE:1f h OlþSI
BY:
L8
DATE: '-4.516 CJ-'s'
WtP
11111111111111 11111
VvfP
Project Proofing
BY:
-1t- x 30 = t~/o + ;'¿o = TOTAL PAGES tLfo
9· DATE:~/s/OLf'~ rnP
Scanning Preparation
Production Scanning I
Stage 1 P AGE COUNT FROM SCANNED FILE: I /D ./
I ( PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: . V/YES NO
BY: ~ I DATE:f¡-JIcI Isl
Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: YES NO
BY:
BEVERL Y ROBIN VINCENT SHERYL MARIA WINDY
DATE:
Isl
(SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS
DUE TO QUALITY. GRAYSCALE OR COLOR IMAGES)
IIIII1I111111111111
ReS can n ed (;,,,lh'id"" I I' ,go ¡ ""oo;a¡ ,,".n flon1 ."-,,,,, ,,;, 9 "'"'' pl'''.d) III II 11111111111111
RESCANNED Br: BEVERLY ROBIN VINCENT SHERYL MARIA WINDY
DATE:
ISI
SCANNED JUL 2 3 200~
Quality Checked (dollc)
1111111111111I11111
General Notes or Comments about this file:
12/10/02Rev3NDTScanned.wpd
• •
BP Exploration (Alaska) Inc. ;, i
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
6 ,
. ��,. P;AA JUL- �� t
July 6, 2011 ,� _
Mr. Tom Maunder av 0 0
Alaska Oil and Gas Conservation Commission
333 West 7 Avenue _ \ 1 F'
Anchorage, Alaska 99501
Subject: Corrosion Inhibitor Treatments of GPMA Niakuk
Dear Mr. Maunder,
Enclosed please find multiple copies of a spreadsheet with a list of wells from GPMA
Niakuk that were treated with corrosion inhibitor in the surface casing by conductor
annulus. The corrosion inhibitor is engineered to prevent water from entering the
annular space and causing external corrosion that could result in a surface casing leak
to atmosphere. The attached spreadsheet represents the well name, API and PTD
numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in
each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Mehreen
Vazir, at 659 -5102.
Sincerely,
Gerald Murphy
BPXA, Well Integrity Coordinator
• •
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion Inhibitor, Sealant Top-off
Report of Sundry Operations (10-404)
Niakuk
Date: 05/15/11
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD # API # cement pumped cement date inhibitor sealant date
ft bbls ft na gal
NK -01A 1760280 500292015801 P&A 3/9/91 NA NA NA NA NA
NK -02A 1760790 500292018001 P&A 3/13/91 NA NA NA NA NA
NK -03 1780940 500292035000 P&A 4/14/80 NA NA NA NA NA
NK-04 1842000 500292121700 P&A 4/14/96 NA NA NA NA NA
NK-05 1850270 500292129000 P&A 4/15/98 NA NA NA NA NA
NK-06 1852760 500292148600 P&A 4/15/96 NA NA NA NA NA
NK -07A 2010830 500292241001 0.2 NA 0.2 NA 0.9 4/30/2011
NK-08A 2010290 500292249101 0.2 NA 0.2 NA 0.9 4/30/2011
NK-09 1941400 500292251800 2.1 NA 2.1 NA 17.0 4/30/2011
NK -10 1931840 600292242600 1.5 NA 1.5 NA 11.9 4/30/2011
NK -11A 2020020 500292278901 1.5 NA 1.6 NA 11.9 4/30/2011
NK -12C 2030650 500292241403 1.8 NA 1.8 NA 31.0 4/30/2011
NK -13 1981340 500292269300 2.3 NA 2.3 NA 22.1 5/4/2011
NK -14A 2060310 500292266801 1.8 NA 1.8 NA 17.0 5/4/2011
NK -15 1970320 600292274500 1.8 NA 1.8 NA 18.7 5/4/2011
NK -16 1940220 500292244700 2.5 NA 2.5 NA 20.4 5/4/2011
NK -17 1961650 500292270900 3 NA 3 NA 20.4 5/4/2011
NK -18 1931770 500292242100 2 NA 2 NA 17.0 5/6/2011
NK -19A 2010700 500292250701 1.8 NA 1.8 NA 15.3 5/8/2011
NK -20A 2050400 500292242901 2.1 NA 2.1 NA 13.6 5/9/2011
NK -21 1940880 500292248700 2 NA 2 NA 22.1 5/15/2011
NK -22A 2012280 500292240201 1.5 NA 1.5 NA 11.9 5/11/2011
NK -23 1940350 500292245500 3.6 NA 3.6 NA 20.4 5/10/2011
NK -25 1970680 500292276000 2.5 NA 2.5 NA 15.3 5/11/2011
NK -26 1940050 500292244000 2.9 NA 2.9 NA 17.0 5/11/2011
NK -27 1950210 500292254700 2.3 NA 2.3 NA 13.6 4/30/2011
NK -28 1980930 500292267800 Sealed Conductor NA Sealed Conductor NA NA NA
NK -29 1961900 500292272400 1.7 NA 1.7 NA 10.2 4/30/2011
NK-38A 2042410 500292254001 3.1 NA 3.1 NA 13.6 5/8/2011
NK-41A 1971580 500292277801 9.1 NA 9.1 NA 54.0 5/9/2011
NK-42 1941080 500292249900 2 NA 2 NA 13.6 5/9/2011
NK-43 2010010 500292299800 1 NA 1 NA 5.1 5/9/2011
NK-61A 2080350 500292289301 14 NA 14 NA 110.5 5/15/2011
NK-82A 2030470 500292285201 1.3 NA 1.3 NA 13.6 5/4/2011
NK-65A 2050630 500292286901 1 NA 1 NA 8.5 5/8/2011
A E SEAN PARNELL, GOVERNOR
ALASKA OIL AATD GAS 333 W. 7th AVENUE, SUITE 100
CONSERVATION COMhIIS5ION ANCHORAGE, ALASKA 99501 -3539
PHONE (907) 279 -1433
FAX (907) 276 -7542
Gary Preble
Data Management Engineer
BP Exploration (Alaska), Inc. r�
P.O. Box 196612 d`—
Anchorage, AK 99519 -6612
Re: Prudhoe Bay Field, Niakuk Pool, NK -11A
Sundry Number: 310 -279
Dear Mr. Preble:�'�
Enclosed is the approved Application for Sundry Approval relating to the above
referenced well. Please note the conditions of approval set out in the enclosed
form.
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause shown,
a person affected by it may file with the Commission an application for
reconsideration. A request for reconsideration is considered timely if it is
received by 4:30 PM on the 23rd day following the date of this letter, or the
next working day if the 23rd day falls on a holiday or weekend.
Sincerely,
4 091 � 1
Daniel T. Seamount, Jr.
Chair
n
DATED this 2 day of November, 2010.
Encl.
by
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
September 1, 2010
'D
Mr. Daniel Seamount, Chairman r t 1 20
Alaska Oil and Gas Conservation Commission
333 West 7 Avenue `'iak'�= t <'`'•�'iissir
Anchorage, Alaska 99501
Subject: Niakuk Well NK -11A (PTD #2020020)
Suspended Well Inspection Report (10 -404)
Application for Renewal of Existing Suspension (10 -403)
Dear Mr. Seamount,
BP Exploration (Alaska) Inc. (BPXA) completed an AOGCC witnessed suspended well
inspection of Niakuk well NK -11A on 08/21/10. Enclosed is a Report of Sundry Well
Operations (10 -404) with attachments documenting the inspection and the current
condition of the well (reference 20 AAC 25.110 (e) and (% We believe this information
demonstrates that the well is mechanically sound. Specific attachments include:
• Suspended Well Site Inspection form documenting the well pressures and site
condition, witnessed by an AOGCC inspector
• Wellbore diagram illustrating the current configuration of the well
• Pad map and aerial photo showing well location and other wells within one -
quarter mile radius of the surface location
• Photographs showing the condition of the wellhead and the surrounding location
Niakuk well NK -11A was suspended on 2/22/02. It is located on a pad with active
producing wells and /or service wells.
Based on this information, BPXA requests approval for renewal of the existing
suspension status for this well. Attached is an Application for Sundry Approval (10-
403) with a technical justification summarizing the information on the current status and
condition of the well (reference 20 AAC 25.110 (a), (b), (e), (h) and (i)).
In summary, BPXA believes Niakuk well NK -11A is mechanically sound and secure and
meets requirements for renewal of suspended status.
•
If you require any additional information, please contact me at 564 -5637, Torin
Roschinger /Jerry Murphy at 659 -5102 or Chris Stone 564 -5518.
Sincerely,
A
i
R. Steven Rossberg
BPXA, Wells Operations Manager
Attachments:
Report of Sundry Operations (Form 10 -404) with attachments:
Suspended Well Site Inspection form
Wellbore Schematic
Well location plat and aerial photo
Pictures of wellhead and location
Application for Sundry Approval (Form 10 -403) with attachment:
Technical Justification
Cc:
Roschinger /Murphy
Harry Engel
Mike Bill
Chris Stone
Bob Gerik
Gary Preble
STATE OF ALASKA
- ALAS AND GAS CONSERVATION COMMISSIA
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
1. Type of Request: Abandon ❑ Suspend ❑ Operational shutdown ❑ Perforate ❑ Re -enter Suspended Well ❑
Alter casing ❑ Repair well ❑ Plug Perforations ❑ Stimulate ❑ Other ❑✓
Change approved program ❑ Pull Tubing ❑ Perforate New Pool ❑ Time Extension ❑ RENEW SUSPENSION
2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number:
BP Exploration (Alaska), Inc. Development ❑� _ Exploratory ❑ 202-0020-
3. Address: P.O. Box 196612 Stratigraphic ❑ Service ❑ 6. API Number:
Anchorage, AK 99519 -6612 50- 029 - 22789 -01 -00 -
7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:
property line where ownership or landownership changes:
Spacing Exception Required? Yes ❑ No NK -11A
El
9. Property Designation (Lease Number): 10. Field / Pool(s):
ADLO- 034630 PRUDHOE BAY Field / NIAKUK OIL Pool
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
17867- 9334.17 - 13799 - 7475.57 13799' TOC P&A PLUG NONE
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 120 20" 94# H -40 42 120 42 120 1530 520
Surface 8035 13 -3/8" 68# L -80 40 8035 40 5016 4930 2270
Intermediate 10699 9 -5/8" 47# L -80 38 10699 38 5755 6870 4760
Liner 5549 7" 29# L -80 7618 13167 4892 7150 8160 7020
Liner 1791 5 -1/2" 17# L -80 13167 14958 7150 8036 7740 6280
Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft):
NONE - - 4/12" 12.6# L -80 SURFACE - 2227'
Packers and SSSV TVDe: 9- 5/8 "x7" BAKER ZXP PKR Packers and SSSV MD and TVD (ft): 7618' 4892'
12. Attachments: Description Summary of Proposal ❑✓ 13. Well Class after proposed work:
Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Development Q- Service ❑
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations: Oil ❑ Gas ❑ WDSPL ❑ Suspended Q-
16. Verbal Approval: Date: WINJ ❑ GINJ ❑ WAG ❑ Abandoned ❑
Commission Representative: GSTOR ❑ SPLUG ❑
17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Gary Preble
Printed Name Gary Preble Title Data Management Engineer
Signature Phone Date
564 -4944 9/1/2010 Prepared by Gary Preble 564 -4944
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number: ' 3 ( 0 - . D
Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑
Other: / ► l ��l�t -( l4 !o vim,+' II.,.:G "_„„ 4+ E D
!� q.� 'rIf y' ifSS10p
lV o1'► c
Subsequent Form Required: �
i. U, it
APPROVED BY
Approved by: COMMISSIONER THE COMMISSION Date: 1112-1
Dl,S I " � la. z�s ` ����j s - �
Form 10-403 Revised 07/2009 I I p%v
Submit in Duplicate
S kuk Oil Pool well NK -11A
Technical Justification for Application for
Renewal of Suspension Status
September 1, 2010
Well Status
Niakuk well NK -11A (PTD # 2020020) was suspended on 2/22/02 after problems
running the liner in a sidetracked hole. The liner top packer prematurely set at 7618'
MD (about 2900' above the intended depth) after an obstruction was encountered while
running the liner. A retainer was set in the liner at 14100' MD with 39 barrels of cement
pumped below and the top of cement above the retainer at 13799' MD. A 4 -1/2" kill
string was left in the well from surface to 2227' MD.
The well is mechanically sound as proven by a pressure test after the casing was
cemented. The well will not allow the migration of fluids, will not damage freshwater or
producing or potentially producing formations, will not impair the recovery of oil or gas,
and is secure, safe, and not a threat to public health.
The strata through which the well was drilled is neither abnormally geo- pressured or
depleted.
Condition of the Wellhead and Surface Location
Niakuk well NK -11A is located on an active, well maintained pad with clean gravel. The
pit and surrounding area are in good condition. There is no discoloration and no sheens
on the pad, pits, or in nearby water. During the inspection, it was discovered the well
sign was missing. A new sign has been ordered and will be placed at the well.
The well pressure readings are T /1 /0 = NA/400/260.
SteJ 4 Zoo r SL - 1Itoj/o
Request !�
o � !o•2Z•w
BPXA requests approval for renewal of the existing suspension status for NK -11A.
A variance to the provisions of 20 AAC 25.110 (c) (2) is also requested under 20 AAC
25.112 (i) to allow the well to remain as suspended in its current condition. All
hydrocarbon intervals are isolated and there are no underground sources of fresh water
in this area.
TREE = 4-1/16" 5M CIW
WELLHEAD FMC NK-11A
ACTUATOR= BAKER SAFETY NOTES: *WELL SUSPENDED W/ 2227
KB. ELEV = 59.8' 4-1/2" 12.6# KILL STRING. 3.725" ID XO PUP
BF. ELEV - NA UNDER TBG HGR. WELL ANGLE> 70 @ 4744'.
KOP = 2450' NOTE PRE NK -11A SIDETRACK WELLBORE NOT
Max Angle = 76 @ 9994' SHOWN ON THIS DIAGRAM BELOW WHIPSTOCK.
Datum MD = 17649'
Datum TVD = 9200' SS
14-1/2" TBG, 12.6 #, L-80_0152 bpf, ID = 3.958" 222T
GAS LIFT MANDRELS
Minimum ID = 3.725" @ 31' ST MD TVD DEV TYPE VLV LATCH PORT DATE
XO PUP UNDER TBG HANGER
TOP OF BAKER TIEBACK SLV, ID = 7.500" 7610'
9 -5/8" X 7" BAKER ZXP PKR, ID = 6.276 7618'
7623' 7" RS NIP, � = 6.188"
9-5/8" X T' BKR FLEXLOK HGR, ID = 6.276" 1 7626'
13 -3/8" CSG, 68 #, L -80, ID = 12.415" 8035'
7" LNR, 29 #, L-80_0371 bpf, ID = 6.184"
9 -518" CSG MILLOUT WINDOW
10699' - 10715' (OFF WHIPSTOCK )
TOP OF BKR WHIPSTOCK 10699'
13165 7" LNR, 29#, L -80, .0371 bpf, ID = 6.184"
7 -5/8" HES EZSV 10727 13167 7" - X5-1/ 2' LNR XO, I D = 4.800"
9 -5/8" CSG, 47 #, L -80, ID = 8.681"
TOP OF 17.0 ppg CMT P&A PLUG 16812 13799 4 P&A PLUG
PERFORATION SUMMARY _
REF LOG: TOP OF 5-1/2" CMT RETAINER 14100'
ANGLE AT TOP PERF:
Note: Refer to Production DB for historical pert data
SIZE SPF INTERVAL Opn /Sqz DATE
5-1 /2" LNR, 17 #, L -80, .0232 bpf, [D = 4.892" 14958
o ff TD 17866'
DATE REV BY COMMENTS DATE REV BY COMMENTS NIAKUK UNIT
09/09/98 ORIGINAL COMPLETION WELL: NK -11A
02/22/02 RIG SIDETRACK (NK -11A) PERMIT No: 202 -0020
09/08/06 CS /PJC TV D/ MD DATUM CORRECTION AN No: 50- 029 - 22789 -01
SEC 36, T12N, RI 5E 131 V NSL & 1021' WEL
BP Exploration (Alaska)
STATE OF ALASKA
ALA AND GAS CONSERVATION COMMISSIO
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate❑ Other Q INSPECT
Performed: Alter Casing ❑ Pull Tubing❑ Perforate New Pool ❑ Waiver❑ Time Extension❑ WELL
Change Approved Program ❑ Operat. Shutdown[ Perforate ❑ Re -enter Suspended Well❑
2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number:
Name: Development ❑✓ Exploratory ❑ \ 202 -0020
3. Address: P.O. Box 196612 Stratigraphic❑ Service ❑ 6. API Number:
Anchorage, AK 99519 -6612 \ 50- 029 - 22789 -01 -00
8. Property Designation (Lease Number) : 1 9. Well Name and Number:
ADLO- 034630 d i (� NK -11A
10. Field /Pool(s):
PRUDHOE BAY FIELD / NIAKUK OIL POOL
11. Present Well Condition Summary:
Total Depth measured 17867 feet Plugs (measured) 13799' TOC P&A P feet
true vertical 9334. feet Junk (measured) None feet
Effective Depth measured 13 feet Packer (measured) 7618'
true vertical 7475.5 feet (true vertical) 4882'
i
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 120 20" 94# H-40 42 - 120 42 - 120 1530 520
Surface 8035 13 -3/8" 68# L -80 40 - 8035 40 - 5016 4930 2270
Intermediate 10699 9 -5/8" 47# L -80 38 - 10699 38 - 5755 6870 4760
Production
Liner 5549 7" 29# L -80 7618 - 13167 4892 - 7150 8160 7020
Liner 1791 5 -1/2" 17# L -80 13167 - 14958 7150 - 8036 7740 6280
Perforation depth: Measured depth: NONE -
True Vertical depth:
i
I
Tubing: (size, grade, measured and true vertical depth) 4 -1/2" 12.6# L -80 SURFACE - 2227' SURFACE - 2226'
I
Packers and SSSV (type, measured and true vertical depth) 9- 5/8 "X7" BAKER ZXP PKR 7618' 4892'
ED
12. Stimulation or cement squeeze summary:" )h
Intervals treated (measured):1��"'
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure
Prior to well operation: SUSPENDED
Subsequent to operation:
14. Attachments: 15. Well Class after work:
Copies of Logs and Surveys Run Exploratory❑ \ D elopment ❑ Service ❑
Daily Report of Well Operations X 1 &. Well Status after we LOSUSPENDED Oil Gas Lj WDSPL Lj
GSTOR ❑ WAG ❑ GINJ ❑ WINJ❑ SPLUG ❑
17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
N/A
Contact Gary Preble
Printed Name Gary Preble Title Data Management Engineer
Signature Phone 564 -4944 Date 9/1/2010
.01 - L� —_ --- I I
Form 1 0 -404 R lsed 7 /2009 RgpMS SEP 01 2010 1F4 P & /0 - • Ga Submit Original Only
• •
Suspended Well Site Inspection Form
Notify AOGCC Inspectors at least 10 days prior to inspection to allow witness
Well Name: PRUDHOE BAY UN NIA NK -11A Field /Pool: PRUDHOE BAY / NIAKUK OIL.
Permit # (PTD): 2020020 API Number: 50029227890100
Operator: BP EXPLOR (ALASKA) INC Date Suspended: 2/22/2002
Surface Location: Section: 36 Twsp: 12N Range: 15E
Nearest active pad or road: Niakuk pad
Take to L ocation
Digital camera Map showing well location /Aerial photos
Brief well history Wellbore diagram showing downhole condition
Latest Sundry or Completion report
Past Site Visit documentation Site clearance documentation
Pressure gauges, fittings, tools Sample containers for fluids on or near pad
Condition of Surfac Location AOGCC requires:
1) a description of the condition of the surface location, including discoloration, fluids or sheens visible
on the ground or in any nearby water,
2) photographs showing the condition of the location surrounding the well
General location condition: Subsidence, appears to have been backfilled
Pad or location surface: Dry _
Location cleanup needed: No
Pits condition: None
Surrounding area condition: Subsidence
Water /fluids on pad: None
Discoloration, Sheens on pad, pits or water: No
Samples taken: None
Access road condition: OK
Photographs taken (# and description): 3; wellhead
Condition of Wellhead AOGCC requires:
1) a description of the condition of the wellhead, 2) well pressure readings, where practicable,
3) photographs showing the wellhead condition
Wellhead /tree /valve description, condition: No S -riser
Cellar description, condition, fluids: Dry
Rat Hole: N/A
Wellhouse or protective barriers: Wellhouse
Well identification sign: No
Tubing Pressure (or casing if no tubing):
Annulus pressures: IA: 400 psi OA: 260 psi 1 y _
Wellhead Photos taken (# and description): 3; wellhead /o-2_740
Work Required: Ordered wellhouse sign
Operator Rep (name and signature): Torin Roschinger
9 , 4, /z ��_• —°
AOGCC Inspector: Chuck Scheve Other Observers: Ryan It
Inspection Date: 8/2112010 AOGCC Notice Date: 8/13/2010
Time of arrival: 9 :00 AM Time of Departure: 9:10 AM
Site access method: Access Road
i
TREE = 4- 1/16" 5M CM/
WELLHEAD-- FMC • N K - 1 1 A
ACTUATOR BAKER SAW NOTES: *WELL SUSPENDED W/ 2227' OF
KB. ELEV = 59.8' 4 -1/2" 12.6# KILL STRING. 3.725" ID XO PUP
BF. ELEV = NA UNDER TBG HGR. WELL ANGLE> 70° @ 4744'.
KOP= 2450' NOTE: PRE- NK -11A SIDETRACK WELLBORE NOT
Max Angle = 76 @ 9994' SHOWN ON THIS DIAGRAM BELOW WHIPSTOCK.
Datum MD 17649'
Datum TVD = 9200' SS
4-1/2" TBG, 12.6 #, L-80_0152 bpf, ID = 3.958" 222T
GAS LIFT MANDRELS
Minimum ID = 3.725" @ 31' ST MD TVD DEV TYPE VLV LATCH PORT DATE
XO PUP UNDER TBG HANGER
TOP OF BAKER TIEBACK SLV, ID = 7.500" 7610'
9 -5/8" X 7" BAKER ZXP PKR, ID = 6.276" 7618'
7623' 7" RS NIP, ID = 6.188"
9 -5/8" X 7" BKR FLEXLOK HGR, ID = 6.276" 7626'
13 -3/8" CSG, 68 #, L -80, ID = 12.415" 8035'
7" LNR, 29 #, L-80_0371 bpf, ID = 6.184"
9 -5/8" CSG MILLOUT WINDOW
10699'- 10715' (OFF WHIPSTOCK)
TOP OF BKR WHIPSTOCK 10699'
13165' 7" LNR, 29 #, L-80,.0371 bpf, 1D = 6.184"
7 -5/8" HES EZSV 10727' 13167' 7" X 5 -1 /2" LNR XO, ID = 4.800"
9 -5/8" CSG, 47 #, L -80, ID = 8.681"
TOP OF 17.0 ppg CMT P &A PLUG 16812' 13799' — . F TOC P&A PLUG
PERFORATION SUMMARY
REF LOG: TOP OF 5-1/2" CMT RETAINER 14100'
ANGLE AT TOP PERF:
Note: Refer to Production DB for historical pert data
SIZE SPF INTERVAL Opn /Sqz DATE
5 -1/2" LNR, 17 #, L -80, .0232 bpf, ID = 4.892" 14958'
OH TD 17866'
DATE REV BY COMMENTS DATE REV BY COMMENTS NIAKUK UNIT
09/09/98 ORIGINAL COMPLETION WELL: NK -11A
02122/02 RIG SIDETRACK (NK -11A) PERMIT No: 202 -0020
09/08/06 CS /PJC TVD/ MD DATUM CORRECTION API No: 50- 029 - 22789 -01
SEC 36, T12N, R15E 1311' NSL & 1021' WEL
BP Exploration (Alaska)
Y - --�!
165' Q.
30 rs �3e
r 162, _ J
28 r r r � I rg�?
i' B19 r 2 .2I S � 1
"go r
r1
EnterjExit�s
n �
r
1 -
Coro ♦�h % vtov, .-
�S for
PRUDHOE BAY UNIT - DS NK
■ ❑ SCALE
SNK
my 13, 2009
Approximate Scale: 1" =300'
2009- 13c -3 -18
AFRO -MURIC
i
r
1
y
a
Xy�
r � r
21 fib' tut
_1M Ail
1' jw
r
. I
r
w
t is
4
0 0
NK -11A (PTD #2020020) TIO Plot
WeR: NK -11
4 01i
3.000 {
L— Tbq
--K— [A
z Oou . on
Don
—� oaon [�
1,000
L
07/03/10 07/10/10 07/17/10 07/24/10 07/31/10 08/07/10 08/14/10 08/21/10 08/28/10 09/04/10 03/11 n0 09/18/10 09125110 1002/10 ��
.
.
WELL LOG TRANS MITT AL
To: State of Alaska
Alaska Oil and Gas Conservation COmIll.
Attn.: Librarian
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
August 25,2006
RE: MWD Formation Evaluation Logs: :N1Z-11A,
AK-MW-22005
NK-llA:
Digital Log Images
50-029-22789-01
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING A1~D RETURNING A COPY OF THE
TRA~SMITTAL LETTER TO THE ATTENTION OF:
Sperry Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
.,
1
; ~;?P8t~: '!.fHIE;
Signed:
1
C ~ LL------
SCANNED AUG 3 1 2006
90d - oc£J 1* ¡L.(ll D
.
.
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _lnserts\Microfilm _ Marker.doc
~c{. M~ ~t cs v(
DATA SUBMITTAL COMPLIANCE REPORT
2/26/2004
Permit to Drill 2020020
Well Name/No. PRUDHOE BAY UN NIA NK-11A
Operator BP EXPLORATION (ALASKA) INC
s~ ~/J~~~
API No. 50-029-22789-01-00
MD
17867 --
TVD
9334 --
Completion Date 2/22/2002 ~.
Completion Status
SUSP
Current Status SUSP
UIC N
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey
Yes
DATA INFORMATION
Types Electric or Other Logs Run:
Well Log Information:
(data taken from Logs Portion of Master Well Data Maint)
Log/ Electr
Data Digital Dataset
Type Med/Frmt Number Name
UD D ~274
L£o D U1273
Rpt
<.,..--ED D Lr-1258
Rpt
Rpt
Log Log Run
Scale Media No
1
Interval OH /
Start Stop CH
10634 17494 C
10634 17810 ð
10634
10634
10634
10634 17810
)
Received Comments
11/6/2002 PB1
e 11/6/2002
11/6/2002 PB1
111712002
111712002
Well CoreslSamples Information:
Name
Interval
Start Stop
Sent
Received
Sample
Set
Number Comments
Daily History Received?
~/N
@N
)
ADDITIONAL INFORMATION
Well Cored? Y I ffJ
Chips Received? -y-¡ ~~
"
Formation Tops
Analysis
Received?
.... Y I N
Comments:
Compliance Reviewed By:
+k
Date:
l~~~
,,--. .
~
a Od-O~
J 1~5?f
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska
November 6, 2002
RE:
MWD Fonnation Evaluation Logs
NK-11A PB 1- REDO,
AK-MW-22005
1 LDWG fonnatted Disc with verification listing.
API#: 50-029-22789-73
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro- Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
Sign~L. O.9o{l'-.J
Note: This Data replaces the previous data due to a change in the API# from 500292278970
to 500292278973.
RECEIVED
NOV 07 2002
Alaska 011 & Gas Cons. Camm' .
Anchoœge IS8íOn
.~
~
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn. : Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska
RE:
MWD FoI111ation Evaluation Logs
NK-11APB1,
AK-MW-22005
1 LDWG foI111atted Disc with verification listing.
llPI#: 50-029-22789-70
aOð~()ð~
II ;:)íq
November 1, 2002
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Speny-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
Sign~' « Qç ~ .J
RECEIVED
NOV 06 2002
Alaska orl & Gas Cons. Commission
Anchorage
,-....,
.~
ex Od-OO~
I / d. Î3
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska
November 1, 2002
RE: MWD Formation Evaluation Logs NK-11A,
AK-MW-22005
1 LDWG formatted Disc with verification listing.
API#: 50-029-22789-01
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Speny-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Si~(~ Q(¿¡z(")
Date:
RECEIVEr)
NOV 06 2002
Alaska 011 8: Gas Cons, Commission
AnchOfaQe
'"
I
~
\
~\
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well
0 Oil 0 Gas II Suspended 0 Abandoned 0 Service
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O,. Box 196612, Anchorage, Alaska 99519-6612 ...~aV(>M_¡d.,,-
4. Location of well at surface f f :~-".- "" ."~... '
1312' NSL, 1021'.W~L, SEC. 36, T12N, R15E, UM ,ô h';'i~'.,,: ',.',' ¡,.".,".ocAt\ON§.....,"
At top of produc~lve Interval i .2:.:.£g~"o'L:. fÐ ¡
2641 NSL,4689 WEL, SEC. 26, T12N, R15E, UM ---,..: <::t l
At total depth i; ~'" . "
2822' NSL, 182' WEL, SEC. 27, T12N, R15E, UM t:::::::==:::::::.!~. .
11. Field and Pool
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Niakuk Oil Pool
KBE = 53.85' ADL 034629
12. Date Spudded \13. Date T.D. Reached 114. Date Comp., Susp., or Aband. 115. Water depth, if offshore \16. No. of Completions
1/21/2002 2/11/2002 2/22/2002 N/A MSL Zero
17. Total Depth (MD+ TVD) \18. Plug Back Depth (MD+ TVD) \19. Directional Survey 120. Depth where SSSV set I 21. Thickness of Permafrost
17867 9334 FT 13799 7476 FT II Yes 0 No N/A MD 1800' (Approx.)
22. Type Electric or Other Logs Run
MWD, GR, RES, PWD, DEN, NEU
23.
CASING
SIZE
20"
13-3/8"
9-5/8"
7"x5-1/2"
Classification of Service Well
7. Permit Number
202-002 302-054 & 302-074
8. API Number
50-029-22789-01
9. Unit or Lease Name
Niakuk
NK-11A
WT. PER FT.
94#
68#
47#
29# / 17#
GRADE
H-40
L-80
L-80
L-80
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH HOLE
Top BOTTOM SIZE CEMENTING RECORD
42' 120' 30" 260 sx Arcticset (Approx.)
40' 8035' 16" 2646 sx PF 'E', 1373 sx 'G', 50 sx PF 'C'
38' 10699' 12-1/4" 747 sx Class 'G'
7610' 14958' 8-1/2" Liner Stuck, Not Cemented
SIZE
4-1/2", 12.6#, L-80
(Kill String)
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Abandonment Plugs, 140 BBls Class 'G'
Set Cement Retainer
Abandonment Plug, 39 Bbls Class 'G'
(Leaving 7 Bbls cement on top of Retainer)
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
None
25.
MD
TVD
TVD
MD
14100'
13799'
AMOUNT PULLED
TUBING RECORD
DEPTH SET (MD)
2227'
PACKER SET (MD)
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
Not on Production N/A
Date of Test Hours Tested ~:~:~~~: FOR OIL-BBL GAs-McF WATER-BBL CHOKE SIZE \ GAS-OIL RATIO
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAs-McF WATER-BBL OIL GRAVITY-API (CORR)
Press. 24.HoUR RATE
28. Brief description of lithology, porosity, fractures, apparent dips a~~;~~:n:: of oil, gas or w~~~t;J~~tl
APR 1 7 2002
Alaska Oil & Gas ConI. CœImi88ion
AndIaIage
No core samples were taken.
Form 10-407 Rev. 07-01-80
RBDMS BFL
APR 2 CJ 2nn:ßubmit ~ ~J>licate
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Terrie Hubble ~~. Title Technical Assistant
NK-11A 202-002 302-054 &
Well Number Permit No. I Approval No.
!",,--,
29. Geologic Markers
Marker Name Measured True Vertical
Depth Depth
West Sak 2 11690' 6225'
Coleville Mudstone 3 13580' 7369'
Tufts 15472' 8292'
HRZ 16438' 8742'
Kuparuk I Zone 4 17000' 8987'
Zone 38 17160' 9055'
Zone 2C 17270' 9101'
Zone 28 17578' 9226'
Zone 2A 17648' 9253'
31. List of Attachments:
Summary of Daily Drilling Reports, Surveys
INSTRUCTIONS
~
30.
Formation Tests
Include interval tested, pressure data, all fluids recovered and
gravity, GOA, and time of each phase.
RECEIVED
APR 1 7 2002
AlaakaOO& GasCona. commission
AncboI8ge
Date CJ-f"(7.0~
Prepared By Name/Number:
Terrie Hubble, 564-4628
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 28: If no cores taken, indicate 'none'.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
Form 10-407 Rev. 07-01-80
<C
...... ......
...... ......
~~
zz
Qj
E
.. ro
Q)z
E
ro c:
Z 0
- E
ro E
0>0
~()
Cì
Co
.9:
CIO
....
N
....
ë¡¡
.9:
0
"<t
to
M
ë¡¡
.9:
0
C')
CIO
Cì
Co
.9:
0
"<t
ai
g
0
..t
I{)
I'-
LÒ
g
0
ci
N
I'-
c5
I-
ü:
N
0
0
N
0
~
....
,~,
~
::;:
0-
M
0
N
M
N
'"
0
0
~
OJ)
'"
N
ti
Q)
E
&
~<
~
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
NK-11
NK-11A
REENTER+COMPLETE
DOYON
DOYON 14
Start: 1/12/2002
Rig Release:
Rig Number:
Spud Date: 11/5/1997
End:
1112/2002 09:00 - 14:30 5.50 RIGU P PRE
14:30 - 15:00 0.50 RIGU P PRE
15:00 - 17:00 2.00 WHSUR P DECOMP
17:00 - 20:00 3.00 RIGU P DECOMP
20:00 - 20:30 0.50 RIGU P DECOMP
20:30 - 21 :30 1.00 PULL P DECOMP
21 :30 - 22:00 0.50 BOPSURP DECOMP
22:00 - 00:00 2.00 BOPSURP DECOMP
1/13/2002 00:00 - 03:00 3.00 BOPSURP DECOMP
03:00 - 07:00 4.00 BOPSURP DECOMP
07:00 - 07:30 0.50 WHSUR P DECOMP
07:30 - 10:00 2.50 CLEAN P DECOMP
10:00-11:30 1.50 CLEAN P DECOMP
11:30-12:00 0.50 CLEAN P DECOMP
12:00 - 12:30 0.50 CLEAN P DECOMP
12:30 - 13:00 0.50 CLEAN P DECOMP
13:00 -15:30 2.50 CLEAN P DECOMP
15:30 - 00:00 8.50 CLEAN P DECOMP
1/14/2002 00:00 - 00:30 0.50 CLEAN P DECOMP
00:30 - 04:30 4.00 CLEAN P DECOMP
04:30 - 05:30 1.00 CLEAN P DECOMP
05:30 - 10:00 4.50 CLEAN P DECOMP
10:00 - 11 :00 1.00 CLEAN P DECOMP
11 :00 - 11 :30 0.50 CLEAN P DECOMP
11 :30 - 13:30 2.00 CLEAN P DECOMP
13:30 - 15:30 2.00 CLEAN P DECOMP
15:30 -17:30 2.00 CLEAN P DECOMP
17:30 -18:00 0.50 CLEAN P DECOMP
18:00 -19:00 1.00 CLEAN P DECOMP
19:00 - 21:00 2.00 CLEAN P DECOMP
21 :00 - 23:30 2.50 STWHIP P WEXIT
23:30 - 00:00 0.50 STWHIP P WEXIT
1/15/2002 00:00 - 01 :30 1.50 STWHIP P WEXIT
01 :30 - 03:30 2.00 STWHIP P WEXIT
03:30 - 07:30 4.00 STWHIP N DPRB WEXIT
Move rig from NK-19A to NK-11A. Spot sub over well level rig.
Ready rig for drilling operations.
Skid floor. Take on seawater.
Nipple down tree, take on sea water, strap RKBs, test
run XlO for tubing hanger
Nipple up BOPE, choke, kill lines
Rig up to pull tubing hanger
Pull tubing hanger and 1 joint of tubing
Rig up to pressure test BOPE
Pressure test BOPE, attempt to test, test plug leaking,
pull out and redress, attempt again, leaks again, notify
FMC to redress test plug
Attempt to seat test plug in wellhead with FMC, redress
test plug, lock down screws all the way in, unable to
pressure test with test plug, run tubing hanger and run
up lock down screws, able to pressure test. Indications are
that tubing spool is worn or out of tolerance.
Pressure test BOPE as per AOGCC I BP regulations
Run wear bushing
P/U excess drill pipe needed to drill well1x1
Reverse circulate and displace freeze protect diesel from
casing
120 psi at 10 bpm.
Trip out, rack excess drillpipe in derrick
Rig service,
Trip out, rack drillpipe in derrick
SLM, P/U, MIU mill BHA, trip in
Trip in 1 x 1, P/U, M/U, drift drillpipe
Trip in 1 x 1, P/U, M/U, drift drillpipe from pipe shed
Displace casing to clean seawater, 8.5 ppg.
Pressure test casing to 3500 psi for 30 minutes, OK
Pump dry job, POOH to 991'
Run set RRTS packer wI BHA
Pull wear bushing
NID BOPE, remove tubing spool
FMC to dress new pack off, install new tubing spool,
pressure test packoff to 5000 psi for 10 minutes.
N/U BOPE, pressure test lower pipe rams, 250 psi for 5
minutes, 3500 psi for 10 minutes, OK
Run wear bushing
Run in and retrievre RTTS packer
Trip out mill BHA, clean rig floor
PJSM, P/U, M/U, directional tools, orient tools, upload
MWD
P/U, M/U mills, whipstock
Orient UBHO sub, P/U, M/U bumper sub, trip in DCs,
HWDP, shallow test MWD
Trip in whipstock on 5" DP, control running speed, 90-
120 seconds per stand, at 4187', well bore 57 - 58
degrees, 2.2 - 2.9 degree Doglegs
Weight increased immediately while pulling out of slips,
both pumps on hole 15 bpm, 1680 psi, attempt to work
Printed: 212512002 2:32:10 PM
r----.,
.~
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
NK-11
NK-11A
REENTER+COMPLETE
DOYON
DOYON 14
Start: 1/12/2002
Rig Release:
Rig Number:
Spud Date: 11/5/1997
End:
1115/2002
03:30 - 07:30
07:30 - 08:00
08:00 - 09:30
09:30 -13:00
13:00 - 14:00
14:00 - 15:00
15:00 - 16:00
16:00 - 17:00
17:00 - 00:00
1/16/2002
00:00 - 00:30
00:30 - 01 :00
01 :00 - 02:30
02:30 - 03:30
03:30 - 06:00
06:00 - 06:30
06:30 - 07:30
07:30 - 18:00
18:00 - 20:00
20:00 - 21 :00
21 :00 - 22:30
22:30 - 00:00
1/17/2002
00:00 - 10:00
10:00 - 11 :30
11 :30 - 11 :45
11 :45 - 13:00
13:00 - 15:30
15:30 - 16:30
16:30 - 18:00
18:00 - 20:00
4.00 STWHIP N
0.50 STWHIP N
1.50 STWHIP N
3.50 STWHIP N
1.00 STWHIP N
1.00 STWHIP N
1.00 STWHIP N
1.00 STWHIP N
7.00 STWHIP N
0.50 STWHIP N
0.50 STWHIP N
1.50 STWHIP N
1.00 STWHIP N
2.50 STWHIP N
0.50 STWHIP N
1.00 STWHIP N
10.50 STWHIP N
2.00 STWHIP N
1.00 STWHIP N
1.50 STWHIP N
1.50 STWHIP N
10.00 STWHIP N
1.50 STWHIP N
0.25 STWHIP N
1.25 STWHIP N
2.50 STWHIP N
1.00 STWHIP N
1.50 STWHIP N
2.00 STWHIP N
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
DPRB WEXIT
string, pull to 170K up, slack off to 125K, neutral 140K,
pump hi-vis sweep and work string, notify drilling support
Anchorage
Pressure up to set hydraulic packer, wellbore pressured
up immediately, staged up in 500 psi increments to 2600
psi, bleed down pressure, pull in 10K increments to shear
off at 110K over neutral, 250K
Trip out to 840'
Stand back DCs, HWDP, layout MWD BHA, work
whipstock to floor, function blind rams
Pick up burn shoe, SLM,
Make up burn shoe, wash over BHA
Make up DCs, HWDP, trip in
Trip in, tag packer at 4182'
Mill on packer, pump hi-vis sweeps, PU 145K, SO 142K,
ROT 145K
RPM 80, SPM 72
Mill with wash over BHA, at 4183', hi-vis sweeps,
PU 145K, SO 142K, ROT 145K, RPM 80, SPM 72,
WOB 30K
Trip out to 3740'
Rig service, slip and cut drilling line, service top drive
Trip out to 772',
Rack HWDP, DCs, UD wash over mills, break out wash
over junk basket, break out 2 more junk baskets, empty,
approx 25 Ibs of metal, rubber recovered, M/U same
M/U flat bottom packer mill, RIH DCs, HWDP
Trip in to top of packer at 4183'
Mill on packer, PU 150K, SO 140K, ROT 145K, Torque 8
- 15,000
RPM 80 - 120, SPM 30 - 75, WOB 25 - 55
Trip out to inspect mill and junk baskets
Break out mill, junk baskets, inspect, clean, flat bottom
mill approx 15% wear, baskets full,
Trip in, lay down string stab, tag packer at 4185"
Millon packer, PU 150K, SO 140K, ROT 145K, Torque 8
- 15,000
RPM 80-120, SPM 25-75, WOB 25-55
Mill on packer using a combination of parameters, packer
dropped free, reverse circulate,
Reverse circulate hi-vis sweep, 380 psi at 8 bpm
Trip in to 4493'
Reverse circulate to clean up junk, 4491', 600 psi at 11
bpm
POOH wet, rack DCs, HWDP
Make service breaks, inspect flat bottom mill, dump junk
baskets, pressure test casing to 3500 psi, OK, wash
inside BOP
Make up reverse circulate mill, junk baskets, HWDP, DCs
Trip in to 4493', PU 135K, SO 132K, ROT 135K, reverse
circulate wI rotary from 4493' to 4518', 400 psi at 9 bpm,
function bag
Printed: 2/25/2002 2:32:10 PM
/~
.----
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
NK-11
NK-11A
REENTER+COMPLETE
DOYON
DOYON 14
Start: 1/12/2002
Rig Release:
Rig Number:
Spud Date: 11/5/1997
End:
1/17/2002 20:00 - 20:30 0.50 STWHIP N DPRB WEXIT Trip in to 4604', tag up, set 3k down
20:30 - 22:30 2.00 STWHIP N DPRB WEXIT Reverse circulate 400 psi at 9 bpm, PJSM, pump hi-vis
sweep, displace casing to clean sea water, function bag
22:30 - 00:00 1.50 STWHIP N DPRB WEXIT Trip out to inspect reverse basket mill and junk baskets
1/18/2002 00:00 - 01 :00 1.00 STWHIP N DPRB WEXIT Standback HWDP, DCs, UD mill, bumper sub, jars, clean
out junk baskets
01 :00 - 01 :30 0.50 STWHIP N DPRB WEXIT Clean rig floor
01 :30 - 02:30 1.00 STWHIP N DPRB WEXIT Rig up slick line
02:30 - 04:00 1.50 STWHIP N DPRB WEXIT #1, run 8.5" guage ring, junk basket to 4671', empty junk
«
basket, recover mixture of gunk, nut plug, metal filings,
rubber cuttings
04:00 - 05:30 1.50 STWHIP N DPRB WEXIT #2, run to 4679', recover mixture gunk, nut plug, metal
filings, rubber cuttings
05:30 - 07:30 2.00 STWHIP N DPRB WEXIT #3, run to 5187', recover mixture gunk, nut plug, metal
filings, some larger pieces, slip and large slivers, rubber
cuttings, chunks, large pieces
07:30 - 09:00 1.50 STWHIP N DPRB WEXIT #4, run to 6000', recover mixture gunk, nut plug, metal
filings, rubber cuttings
09:00 - 09:30 0.50 STWHIP N DPRB WEXIT Rig down slick line
09:30 - 10:00 0.50 STWHIP N DPRB WEXIT P/U, M/U BHA, re-run packer mill, 3 junk baskets,
scrapper
10:00-11:00 1.00 STWHIP N DPRB WEXIT RIH with HWDP, DCs, change out slips
11:00-12:00 1.00 STWHIP N DPRB WEXIT Trip in to 6515'
12:00 - 22:00 10.00 STWHIP N DPRB WEXIT 6515', reverse circulate, stage to 7473', rev circ, stage to
9008', rev circ, stage to 10,925', rev circ,
Circulate casing 2 volumes long way, displace casing with
142 bbls hot oil, 2 bpm, reverse circulate hot oil, 10.5
bpm at 840 psi, followed by one complete reverse
circulation
22:00 - 00:00 2.00 STWHIP N DPRB WEXIT Trip out to lay down mill BHA
1/19/2002 00:00 - 02:30 2.50 STWHIP N DPRB WEXIT POOH with mill, 3 junk baskets, scrapper
02:30 - 03:30 1.00 STWHIP N DPRB WEXIT UD BHA, clean junk baskets, minimal recovery of gunk,
metal, rubber
03:30 - 04:30 1.00 STWHIP N DPRB WEXIT Rig up Halliburton slick line,
04:30 - 10:30 6.00 STWHIP N DPRB WEXIT #1 run to 10,925', recover minimal gunk, metal, rubber
#2 run to 10,925', recover minimal gunk, metal, rubber
10:30-11:30 1.00 STWHIP N DPRB WEXIT Rig down slick line
11:30-12:00 0.50 STWHIP N DPRB WEXIT P/U, M/U Halliburton bridge plug, 7 5/8" EZSV mechanical
set
12:00 -16:00 4.00 STWHIP N DPRB WEXIT Trip in bridge plug, surface test MWD, fill and test MWD
every 3000'
Control running speed
16:00 - 18:00 2.00 STWHIP P WEXIT Trip in to 10,650', fill pipe, pump to test MWD, log down
at 120' I hr, to 10,727', correlate logs,
18:00 - 20:00 2.00 STWHIP P WEXIT Set bridge plug at 10,726.56', pressure test casing to
3500 psi for 5 minutes, OK, tag up and set 10K on
bridge plug, OK, function top pipe rams
20:00 - 21 :00 1.00 STWHIP P WEXIT Slip and cut drilling line
21 :00 - 00:00 3.00 STWHIP P WEXIT Trip out to 2828'
1/20/2002 00:00 - 01 :00 1.00 STWHIP P WEXIT Trip out to lay down BHA
01:00 - 01:30 0.50 STWHIP P WEXIT Lay down bridge plug running tools
01 :30 - 02:00 0.50 STWHIP P WEXIT Pull wear bushing
Printed: 212512002 2:32:10 PM
~
~,
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
NK-11
NK-11A
REENTER+COMPLETE
DOYON
DOYON 14
Start: 1/12/2002
Rig Release:
Rig Number:
Spud Date: 11/5/1997
End:
1120/2002 02:00 - 02:30 0.50 STWHIP P WEXIT Rig up to pressure test BOPE
02:30 - 06:30 4.00 STWHIP P WEXIT Pressure test BOPE as per AOGCC I BP regulations
06:30 - 07:00 0.50 STWHIP P WEXIT Run wear bushing
07:00 - 08:30 1.50 STWHIP P WEXIT P/U, MIU whipstock BHA, MWD, orient, RIH DCs, HWDP,
flow test MWD
08:30 - 14:00 5.50 STWHIP P WEXIT Trip in at control running speed of 90 seconds I stand
14:00 - 15:00 1.00 STWHIP P WEXIT Fill pipe, orient whip stock 85 degrees left hi-side, PU
200K, SO 155K, set whip stock, shear at 25K, top at
10,699'
15:00 - 16:00 1.00 STWHIP P WEXIT Displace sea water to LSND mud, 9.4 ppg, rate of 12
bpm
16:00 - 21 :30 5.50 STWHIP P WEXIT Mill window I formation as per Baker supervisor to 10732'
Top of window at 10,699'
21 :30 - 22:30 1.00 STWHIP P WEXIT Circulate hi-vis sweep, ream through window, work mills
22:30 - 23:00 0.50 STWHIP P WEXIT FIT to mud weight of 12.8 ppg, wellbore pressure leaked
off at 830 psi = to 12.1 ppg mud weight
23:00 - 00:00 1.00 STWHIP P WEXIT Flow check, OK, pump dry job, POOH to 9800'
1/21/2002 00:00 - 03:00 3.00 STWHIP P WEXIT Trip out mill BHA
03:00 - 04:30 1.50 STWHIP P WEXIT Lay down mill BHA, 9 spiral DCs, 8 HWDP
04:30 - 05:00 0.50 STWHIP P WEXIT Rig up and jet flush inside BOP, clear rig floor
05:00 - 08:00 3.00 DRILL P PROD1 P/U, M/U, directional BHA, bit, MM at 1.5 degrees, MWD
tools, jars, accelerator, HWDP, upload MWD, trip in, flow
test MWD
08:00 - 12:00 4.00 DRILL P PROD1 Trip in
12:00 - 12:30 0.50 DRILL P PROD1 Rig service, service top drive
12:30 -13:30 1.00 DRILL P PROD1 Trip in to 10,699', orient and slide through window with
out pumps, good entry
13:30 - 00:00 10.50 DRILL P PROD1 Directional drill 81/2" wellbore to 11,400'
AST 3.56, ART 2.34, ADT 5.9
1/22/2002 00:00 - 10:30 10.50 DRILL P PROD1 Drill 8 1/2" hole from 11,400' to 11,958'. AST=3.0, ART=3.61.
10:30 - 11 :30 1.00 DRILL P PROD1 CBU. Flow check. Well static.
11 :30 - 13:30 2.00 DRILL P PROD1 POH to 7,642'.
13:30 - 15:00 1.50 DRILL P PROD1 Slip and cut drilling line. Service top drive.
15:00 - 17:30 2.50 DRILL P PROD1 POH from 7,642' to BHA.
17:30 - 19:30 2.00 DRILL P PROD1 Flow check at BHA. Stand back HWDP. Flush MWD and
motor with water. Stand back DCs. Down load MWD. LD
BHA.
19:30 - 20:00 0.50 DRILL P PROD1 Clear rig floor. PU tools and stream.
20:00 - 21 :30 1.50 DRILL P PROD1 PU motor, float sub, flex DC, and adjustable gauge stabilizer.
Function test AGS. Adjust motor bend to 1.22 deg.
21 :30 - 23:00 1.50 DRILL P PROD1 PU MWD tools. Orient motor to MWD. Surface test and
upload to MWD.
23:00 - 00:00 1.00 DRILL P PROD1 Load radio active sources. PU DCs and HWDP.
1/23/2002 00:00 - 03:00 3.00 DRILL P PROD1 PU 99 joints of 5" DP from pipe shed. Fill pipe.
03:00 - 06:00 3.00 DRILL P PROD1 TIH to window. Fill pipe. Orient and slide through window.
06:00 - 07:00 1.00 DRILL P PROD1 RIH. Tight hole at 11,060', 11,337', 11,780'.
07:00 - 00:00 17.00 DRILL P PROD1 Drill from 11,958' to 13,711'. AST=1.0, ART=11.34.
1/24/2002 00:00 - 06:30 6.50 DRILL P PROD1 Drill from 13,711' to 14,189'. Rotating with AGS closed
attempting to maintain inclination.
06:30 - 07:30 1.00 DRILL P PROD1 Pump sweep and CBU. Flow check. Well static.
07:30 - 11 :30 4.00 DRILL P PROD1 POH. Back ream from 13,103'to12,560'. POHt011,760'.
RIH to 14,093'. Ream to bottom. No hole problems while RIH.
11:30-12:00 0.50 DRILL P PROD1 Circulate and toggle modes on MWD.
Printed: 212512002 2:32:10 PM
~
~
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
NK~11
NK~11A
REENTER+COMPLETE
DOYON
DOYON 14
Start: 1/12/2002
Rig Release:
Rig Number:
Spud Date: 11/5/1997
End:
1124/2002 12:00 - 23:30 11.50 DRILL P PROD1 Drill form 14,189' to 15,147'. Slide to maintain inclination.
23:30 - 00:00 0.50 DRILL P PROD1 Finish circulating sweep out of hole. Flow check. Well static.
Blow down top drive.
1/25/2002 00:00 - 01 :30 1.50 DRILL P PROD1 Short trip from 15,147' to 14,100'. Wash down from 15,053' to
15,148'. Survey. Pump sweep.
01 :30 - 17:00 15.50 DRILL P PROD1 Drill from 15,147' to 16,104'. AST=3.78, ART=6.24.
17:00 - 18:30 1.50 DRILL P PROD1 Survey. Continue to circulate sweep out of hole. Circulate and
condition mud to < 10 YP.
18:30 - 22:00 3.50 DRILL P PROD1 Flow check. Well static. Blow down top drive. Pull 5 stands.
Flow check. Well static. POH to 10,400'. Hole in good shape.
22:00 - 22:30 0.50 DRILL P PROD1 Clear rig floor. PU RTTS packer and storm valve. Steam
same.
22:30 - 23:30 1.00 DRILL P PROD1 MU storm valve and RTTS packer. RIH and set packer at 40'.
LD two singles.
23:30 - 00:00 0.50 DRILL P PROD1 Pull wear bushing.
1/26/2002 00:00 - 00:30 0.50 DRILL P PROD1 RU to test BOPE.
00:30 - 04:30 4.00 DRILL P PROD1 Test BOPE to 250 I 3,500 psi as per BP policy and AOGCC
regulations.
04:30 - 05:00 0.50 DRILL P PROD1 RD test equipment. Install wear ring.
05:00 - 06:00 1.00 DRILL P PROD1 RU and retrieve RTTS packer. LD RTTS.
06:00 - 07:30 1.50 DRILL P PROD1 Slip and cut drilling line. Service top drive.
07:30 - 11 :00 3.50 DRILL P PROD1 PU 45 joints of DP from pipe shed. RIH. Tight hole at 15,778'.
11:00-14:00 3.00 DRILL P PROD1 Ream tight hole. Hole packed off. Work pipe and establish
circulation. Condition mud. Work and ream tight hole. Wash
to bottom from 15,819' to 16,104'. Circulate and condition
mud.
14:00 - 14:30 0.50 DRILL P PROD1 Slide from 16,104' to 16,144' while holding PJSM for mud
displacement.
14:30 -15:00 0.50 DRILL P PROD1 Pump 45 bbls sweep and 100 bbl high viscosity spacer. Line
up to pump 4% KCL GEM mud.
15:00 - 17:00 2.00 DRILL P PROD1 Displace well bore to 4% KCL GEM mud while control drilling at
35 fph to 16,202'.
17:00 - 00:00 7.00 DRILL P PROD1 Drill from 16,202' to 16,476'. AST=4.15, ART=2.07.
1/27/2002 00:00 - 14:30 14.50 DRILL P PROD1 Drill from 16,476' to 17,102'. Bit quit drilling. ROP dropped
from 100 fph to 0 over 60'. AST=1.75, ART=8.28.
14:30 - 15:00 0.50 DRILL P PROD1 Circulate and prepare to trip out of hole.
15:00 - 00:00 9.00 DRILL P PROD1 Flow check. Well static. Blow down top drive. POH.
1/28/2002 00:00 - 02:00 2.00 DRILL P PROD1 Continue to POH laying down DP.
02:00 - 05:00 3.00 DRILL P PROD1 Remove RA sources. Break bit. LD motor. Download MWD.
LD HOC, MWD probe, and pulser.
05:00 - 06:00 1.00 DRILL P PROD1 MU BHA. MU HOC, MWD probe and pulser. MU and adjust
motor bend to 1.5 deg. Orient motor to MWD.
06:00 - 08:00 2.00 DRILL P PROD1 MU bit. Flow test MWD. Upload MWD. Load RA sources.
08:00 - 13:30 5.50 DRILL P PROD1 RIH picking up 93 joints from pipe shed. RIH with stands from
7,653' to 10,530'.
13:30 - 14:30 1.00 DRILL P PROD1 Slip and cut drilling line.
14:30 - 16:30 2.00 DRILL P PROD1 RIH to 14,270'.
16:30 - 17:00 0.50 DRILL P PROD1 Hole started to pack off after filling DP. Worked pipe. Tight
hole. Wash and ream from 14,270' to 14,360'.
17:00 - 17:30 0.50 DRILL P PROD1 RIH to 15,000'.
17:30 - 20:30 3.00 DRILL P PROD1 Work and ream tight hole from 14,844' to 15,036'. Minor
packing off. Circulate and condition mud.
20:30 - 00:00 3.50 DRILL P PROD1 Continue to work and ream pipe in hole to 15.640'.
Printed: 212512002 2:32: 1 0 PM
,~"
~
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
NK-11
NK-11A
REENTER+COMPLETE
DOYON
DOYON 14
Start: 1/12/2002
Rig Release:
Rig Number:
Spud Date: 11/5/1997
End:
1129/2002 00:00 - 08:30 8.50 DRILL P PROD1 Ream tight hole from 15,640' to 15,800'. RIH wlo reaming to
16,492', Continue reaming to 17,102'. Obtain mad pass logs
while reaming to bottom.
08:30 - 00:00 15.50 DRILL P PROD1 Drill from 17,102' to 17,307'. AST= 2.75 ART= 10.25
1/30/2002 00:00 - 04:30 4.50 DRILL P PROD1 Drill from 17,307' to 17,334'. Bit quit drilling. AST=O,
ART=4.5.
04:30 - 06:00 1.50 DRILL P PROD1 Circulate sweep out of hole. Flow check. Well static.
06:00 - 13:00 7,00 DRILL P PROD1 POH. 325K PU weight off bottom. No problems in open hole.
UD app. 1000 ft. of d.p. (unable to rack all back in derrick)
13:00 - 13:30 0.50 DRILL P PROD1 LD BHA.
13:30 - 15:00 1.50 DRILL P PROD1 Remove RA source. Flush MWD tools with water. Break bit.
Down load MWD.
15:00 - 16:30 1.50 DRILL P PROD1 LD MWD and motor.
16:30 - 17:30 1.00 DRILL P PROD1 MU mud motor and adjust to 1.22 deg bend. MU bit and MWD.
Orient motor to MWD.
17:30 -19:00 1.50 DRILL P PROD1 Upload MWD. Surface test MWD and load RA source.
19:00 - 19:30 0.50 DRILL P PROD1 MU drill collars and HWDP.
19:30 - 00:00 4.50 DRILL P PROD1 TIH to 10,600'. Begin to slip drilling line.
1/31/2002 00:00 - 01 :30 1.50 DRILL P PROD1 Slip and cut drilling line. Service top drive.
01 :30 - 04:30 3.00 DRILL P PROD1 RIH. Take 9 check shot surveys from 11,976' to 12,173' and
13,397' to 13,429' to satisfy Calandra calculations. RIH to
17,042'. A few spots took weight at 15,130' and 15,400'.
04:30 - 08:30 4.00 DRILL P PROD1 Wash and ream from 17,042' to 17,334' with 405 gpm, 30 rpm.
Orient high side the last 30' and wash down wlo rotation
attempting to wash past junk. Stalled the motor twice from
17,330' to 17,334'.
08:30 - 11 :30 3.00 DRILL P PROD1 Attempt to work past junk in hole and drill new fromation.
Stacking weight on bit and seeing no differential pressure from
motor. Unable to drill.
11 :30 - 16:00 4.50 DRILL P PROD1 Mad pass from 17,338' to 17,025'.
16:00 - 23:00 7.00 DRILL P PROD1 Flow check. Well static. Pump dry job. POH to BHA.
23:00 - 00:00 1.00 DRILL P PROD1 LD jars and NM drill collars. Flush MWD and motor with water.
2/1/2002 00:00 - 02:30 2.50 DRILL P PROD1 Remove RA sources. Break bit. Adjust motor. Down load
MWD. LD MWD and motor.
02:30 - 04:30 2.00 DRILL N DFAL PROD1 PU milling BHA. SLM. MU milling BHA.
04:30 - 07:00 2.50 DRILL N DFAL PROD1 RIH to 10,339'.
07:00 - 08:30 1.50 DRILL N DFAL PROD1 Slip and cut drilling line.
08:30 - 11 :00 2.50 DRILL N DFAL PROD1 RIH to 17,142'. No hole problems.
11 :00 - 12:30 1.50 DRILL N DFAL PROD1 Ream with mill from 17,142' to 17,338'.
12:30 -17:30 5.00 DRILL N DFAL PROD1 Mill junk and formation from 17,338' to 17,344' with different
milling techniques and different parameters.
17:30 - 20:30 3.00 DRILL N DFAL PROD1 Pump sweep. Rotate and reciprocate while circuiting sweep
out of hole. Top drive stalled twice when sweep exited the mill.
Observe well. Well static. Mill with 200 gpm and top drive
stalled. Attemt to mill wlo pumping, irratic torque. Continue to
mill at 200 gpm until smooth torque and smooth reaming.
20:30 - 00:00 3.50 DRILL N DFAL PROD1 Pump dry job with mill on bottom. Flow check. Well static.
POH.
2/2/2002 00:00 - 04:00 4.00 DRILL N DFAL PROD1 Continue to POH from 9,553'.
04:00 - 05:30 1.50 DRILL N DFAL PROD1 Break mill, boot baskets, float sub, oil jar, and bumper sub.
Clean out boot baskets off critical path.
05:30 - 06:00 0.50 DRILL P PROD1 Pull wear ring.
06:00 - 06:30 0.50 DRILL P PROD1 RU to test BOP.
Printed: 2125/2002 2:32:10 PM
~
~
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
NK-11
NK-11A
REENTER+COMPLETE
DOYON
DOYON 14
Start: 1/12/2002
Rig Release:
Rig Number:
Spud Date: 11/5/1997
End:
212/2002 06:30 - 11 :00 4.50 DRILL P PROD1 Test BOPE to 250 13,500 psi as per BP policy and AOGCC
regulations. Witness of test waived by Jeff Jones of AOGCC.
11:00 -11:30 0.50 DRILL P PROD1 Install wear ring.
11:30-12:30 1.00 DRILL P PROD1 MU motor and bit. Adjust motor bend to 1.22 deg. PU float
sub and MWD tools.
12:30 - 13:30 1.00 DRILL P PROD1 Upload to MWD tools. Surface test MWD.
13:30 - 14:30 1.00 DRILL P PROD1 PJSM. Load RA source.
14:30 - 15:30 1.00 DRILL P PROD1 Continue to MU Drill collars, Jars, accelerator, and HWDP.
15:30 - 19:00 3.50 DRILL P PROD1 RIH to 10,600'.
19:00 - 20:30 1.50 DRILL P PROD1 Slip and cut drilling line. Service top drive.
20:30 - 00:00 3.50 DRILL P PROD1 Continue to RIH to 17,232'.
2/3/2002 00:00 - 00:30 0.50 DRILL P PROD1 Orient high side. Wash to bottom and ream 6' of under guage
hole made with junk mill. BHA hanging up. Work weight to bit.
00:30 - 13:00 12.50 DRILL P PROD1 Drill from 17,344' to 17,535'. AST=0.5, ART=10.52.
13:00 - 15:00 2.00 DRILL P PROD1 Rotate and reciprocate pipe while circulating sweep out of hole.
15:00 - 22:30 7.50 DRILL P PROD1 Flow check. Well static. Pump dry job. POH.
22:30 - 23:30 1.00 DRILL P PROD1 LD HWDP and DCs.
23:30 - 00:00 0.50 DRILL P PROD1 Flush BHA with water. Unload RA source from MWD.
2/4/2002 00:00 - 01 :30 1.50 DRILL P PROD1 Finish LD BHA.
01 :30 - 02:00 0.50 DRILL C PROD1 RU elevators and iron rough neck dies to PU 3 1/2" DP from
pipe shed.
02:00 - 03:30 1.50 DRILL C PROD1 MU 3 1/2" mule shoe. PU 48 joints of 3 1/2" DP from pipe
shed.
03:30 - 07:00 3.50 DRILL C PROD1 Change elevators and iron rough neck dies. RIH with stands of
5" DP to 10,608'.
07:00 - 08:30 1.50 DRILL C PROD1 Circulate at 990 psi, 8 bpm while Slipping and cutting drilling
line. Service top drive.
08:30 - 00:00 15.50 DRILL X WAIT PROD1 Shut down operations due to phase three weather conditions.
Wait on weather.
2/5/2002 00:00 - 14:00 14.00 DRILL X WAIT PROD1 Wait on weather, Phase 3 on location
14:00 - 17:00 3.00 DRILL C PROD1 Trip in to 17,310'. Tag up on tight hole or fill. Break circ.
slowly, String partially plugged. Hole packing off. Bleed
pressure and free up pipe. Position pipe and rotate. Stage up
pumps to 110 spm @ 2240 in 5 stk. increments every 5
minutes.
17:00 - 22:30 5.50 DRILL C PROD1 Wash and rotate through tight spot, circulate to bottom,
stage pumps up to 13 bpm, at 17,325' bottoms up
showed increase of cuttings at shaker
22:30 - 00:00 1.50 DRILL C PROD1 Circulate bottoms up at 13 bpm, 2730 psi
2/6/2002 00:00 - 01 :30 1.50 DRILL C PROD1 Circulate wellbore at 13 bpm, 2750 psi
01 :30 - 02:30 1.00 DRILL C PROD1 PJSM, test lines to 3500 psi, pump 17 ppg cement plug,
80 bbls
02:30 - 03:00 0.50 DRILL C PROD1 Displace wI rig pump, 2700 strokes, 13 bpm at 3800 psi
03:00 - 04:00 1.00 DRILL C PROD1 Break down cementing head, trip out 11 stands to 16,490'
04:00 - 07:30 3.50 DRILL C PROD1 Circulate wellbore at 13 bpm, 2,800-3,000
07:30 - 08:30 1.00 DRILL C PROD1 Displace to 17.1 ppg mud spacer, 116 bbls at 12 bpm at
2040 psi
08:30 - 09:00 0.50 DRILL C PROD1 Trip out to 15,400'
09:00 - 10:30 1.50 DRILL C PROD1 Circulate wellbore at 12 bpm at 2200 psi, recover 5 bbls
of 17.1 ppg mud spacer
10:30 - 13:00 2.50 DRILL C PROD1 Trip in to 15,600', circulate wellbore at 12 bpm at 2190
psi, recover 15 bbls of 17.1 ppg mud spacer
Printed: 2/25/2DD2 2:32:10 PM
~
-"
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
NK-11
NK-11A
REENTER+COMPLETE
DOYON
DOYON 14
Start: 1/12/2002
Rig Release:
Rig Number:
Spud Date: 11/5/1997
End:
21612002
13:00 - 13:30
13:30 - 14:00
14:00 - 14:30
14:30 - 16:00
2/7/2002
16:00 - 21 :30
21 :30 - 22:30
22:30 - 00:00
00:00 - 04:00
04:00 - 07:30
07:30 - 09:00
09:00 - 11 :30
11:30-12:30
12:30 - 22:00
22:00 - 00:00
2/8/2002
00:00 - 03:00
03:00 - 00:00
2/9/2002
00:00 - 12:30
12:30 - 14:00
14:00 - 16:00
16:00 - 16:30
16:30 - 17:00
17:00 - 17:30
17:30 - 18:30
18:30 - 19:00
19:00 - 00:00
2/10/2002
00:00 - 16:00
16:00 - 18:00
18:00 - 22:30
22:30 - 23:30
2/11/2002
23:30 - 00:00
00:00 - 00:30
0.50 DRILL
c
PROD1
0.50 DRILL
C
PROD1
0.50 DRILL
1.50 DRILL
C
C
PROD1
PROD1
5.50 DRILL C
1.00 DRILL C
1.50 STKOH C
4.00 STKOH C
PROD1
PROD1
PROD2
PROD2
3.50 STKOH C
1.50 STKOH C
PROD2
PROD2
2.50 STKOH C
PROD2
1.00 STKOH C
PROD2
9.50 STKOH C
2.00 STKOH C
PROD2
PROD2
3.00 STKOH C
PROD2
21.00 DRILL
PROD2
C
12.50 DRILL
PROD2
C
1.50 DRILL
C
PROD2
2.00 DRILL
0.50 DRILL
0.50 DRILL
0.50 DRILL
1.00 DRILL
0.50 DRILL
5.00 DRILL
C
C
C
x
C
x
C
PROD2
PROD2
PROD2
RREP PROD2
PROD2
RREP PROD2
PROD2
16.00 DRILL
C
PROD2
2.00 DRILL
C
PROD2
4.50 DRILL
PROD2
C
1.00 DRILL
PROD2
c
0.50 DRILL
0.50 DRILL
C
C
PROD2
PROD2
PJSM, test lines to 3500 psi, pump 17 ppg cement plug,
39 bbls
Displace wI rig pump, 247 bbls mud at 13 bpm at 2750
pSI
Trip out to 15,255',
Circulate wellbore, pump 25 bbls nut plug sweep, recover
30 bbls of cement I mud contamination
Flow check, dry job, trip out to 1532'
Lay down 3 1/2" drillpipe, mule shoe
PU, MU, directional BHA
MU, PU, BHA, upload MWD, shallow test MWD, PJSM,
load nuclear sources, re-test MWD, MU HWDP, drilling
jars, accelerator jars
Trip in, fill pipe 3837', 7187', RIH to 10,600'
Rig service, slip I cut, double cut, service top drive, fill
pipe
Trip in, good window entry, wash down last stand, tag
plug at 15,265'
Wash and polish plug, circulate wellbore clean, 13 bpm
at 3410 psi
Directional drill sidetrack from 15,265' to 15,409'
Time drill at 10 minutes I foot, from 15,409' to 15,416'
AST 5.08, ART 0.6, ADT 5.24
Time drill off cement plug from 15,416' to 15,428'
Directional drill 81/2" wellbore from 15,428' to 16,027'
AST 8.5, ART 7.62, ADT 16.12
Directional drill 81/2" production wellbore from 16,027' to
16,480'
AST 2.08, ART 5.43, ADT 7.51,
Finish circulating sweep, started at 16,460', sweep to
surface, SPR's
Flow check, POOH to 15,048', wellbore in good condition
RIH, wash from 16,386' to 16,480'
Directional drill from 16,480' to 16,505'
Rig repair, change out swab in pump # 1, left side
Directional drill from 16,505' to 16,578'
Rig repair, change out swab in pump # 1, right side
Directional drill from 16,578' to 16,850'
AST .61, ART 4.25, ADT 4.86,
Directional drill 8 1/2" production wellbore from 16,850' to
17,584'
AST 0.66, ART 12.79, ADT 13.45
Circulate wellbore, finish pumping sweep started at 17,566'
at 525 gpm, MWD survey, SPRs, flow check, dry job
Trip out: Slight over pulls between 15-20K @ 15,838', 11,950'
-11,896',11,896-11,842'
Window section showed intermittent 15K drag. Hole appears to
be in good shape
PU, MU, RTTS packer, hang drillstring, 200K off at 50'
KB, 10,400' bit depth
Rig up to test BOPE as per AOGCC I BP regulations
Rig up to test BOPE
Printed: 212512002 2:32:10 PM
~,
----.
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
NK-11
NK-11A
REENTER+COMPLETE
DOYON
DOYON 14
Start: 1/12/2002
Rig Release:
Rig Number:
Spud Date: 11/5/1997
End:
2111/2002 00:30 - 05:00 4.50 DRILL C PROD2 Pressure test BOPE as per AOGCC I BP regulations; 250
low--3500 high.
05:00 - 05:30 0.50 DRILL C PROD2 Run wear bushing
05:30 - 06:30 1.00 DRILL C PROD2 Retrieve RTTS packer and drillstring
06:30 - 08:00 1.50 DRILL C PROD2 Rig sevice, slip I cut, double cut, service top drive
08:00 - 10:30 2.50 DRILL C PROD2 Trip in, wash last stand down
10:30-11:00 0.50 DRILL C PROD2 Break circulation, stage up to 12 bpm at 3280 psi
11 :00 - 18:00 7.00 DRILL C PROD2 Directional drill 81/2" production wellbore from 17,589' to
17,867'
AST 0, ART 5, ADT 5,
18:00 - 18:30 0.50 DRILL C PROD2 Circulate wellbore, MWD survey, SPRs
18:30 - 19:00 0.50 DRILL C PROD2 Short trip out 5 stands, wellbore in good condition, wash
down last stand 17,823' to 17,867'
19:00 - 23:00 4.00 DRILL C PROD2 Circulate wellbore, circ weighted sweep, noteable increase
in cuttings, circ second sweep, hi-vis, wellbore clean, circ
275 bbl liner pill wI an extra 3.5 % easy glide, pump dry
job
23:00 - 00:00 1.00 DRILL C PROD2 Trip out, drop rabbit, 2", lay down 150 jts DP, hole taking
proper fill up
2/12/2002 00:00 - 03:30 3.50 DRILL C PROD2 POH laying down 50 stands of drillpipe 1x1. to app. 13,310. No
adverse hole conditions and taking proper displacement.
03:30 - 08:30 5.00 DRILL C PROD2 POH by stands racking back in derrick. Hole in good shape.
Pump dry job at window.
08:30 - 13:30 5.00 DRILL C PROD2 UD and download MWD and BHA. Break and grade bit. Adjust
motor back.
13:30 -14:00 0.50 DRILL C PROD2 Clear floor of all vendors excess equipment and ready rig for
next operation.
14:00 - 15:30 1.50 CASE P PROD2 Pick up and rig up to run 5.5 x 7 tapered liner. PJSM with crew.
15:30 - 00:00 8.50 CASE P PROD2 P/U and check floatjts.. Run 5.5" x 7" liner 17 and 29#. Use
collar clamp on all flush jt. connections. Monitor well for fluid
loss while running in hole.
2/13/2002 00:00 - 08:30 8.50 CASE P PROD2 Con't RIH wI 5 1/2" x 7" liner.
08:30 - 09:00 0.50 CASE P PROD2 Change elevators. MU liner hanger
09:00 - 10:30 1.50 CASE P PROD2 Circ & condition mud. Record parameters.
10:30 - 14:30 4.00 CASE P PROD2 Con't run liner on 5" DP to 10,586 ft. Control running speed. Fill
pipe every 10 stds.
14:30 - 16:00 1.50 CASE P PROD2 Circ & condition mud. Record parameters.
16:00 - 23:30 7.50 CASE P PROD2 Con't run liner on 5" DP. Control running speed. Fill pipe on the
fly, and break circ every 10 stds. Work pipe and circ 13,457 to
14,958 ft. Suspect liner hanger released.
23:30 - 00:00 0.50 CASE N DPRB PROD2 Circ hole, mix dry job.
2/14/2002 00:00 - 04:00 4.00 CASE N DPRB PROD2 POH LD liner running tool. Inspect same. Discover set screws
on torque fingers backed off. 1 torque finger and 4 set screws
left in hole.
04:00 - 07:00 3.00 CASE N DPRB PROD2 MU fishing BHA, RIH same to 3640'
07:00 - 08:00 1.00 CASE P PROD2 Slip & cut Drlg line. Service TD
08:00 - 09:00 1.00 CASE N DPRB PROD2 Con't RIH wI spear. Engage liner @ 7610'
09:00 - 10:00 1.00 CASE N DPRB PROD2 Confirm 'ZXP' liner top pkr set wI 500 psi inside and test
annulus 500 psi. Work liner utilizing bumper sub.
10:00 - 18:30 8.50 CASE N DPRB PROD2 POH LD excess 5" DP. LD fishing BHA incluing 6" DC's
18:30 - 20:00 1.50 CASE N DPRB PROD2 Clear rig floor. Function test blinds. Chg top pipe rams to
varibles for tapered string.
20:00 - 21 :30 1.50 CASE N DPRB PROD2 Pull wear bushing, install test plug, test rams 250 13500 psi.
Printed: 2/2512002 2:32:10 PM
~
~
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
NK-11
NK-11A
REENTER+COMPLETE
DOYON
DOYON 14
Start: 1/12/2002
Rig Release:
Rig Number:
Spud Date: 11/5/1997
End:
2114/2002 20:00 - 21 :30 1.50 CASE N DPRB PROD2 Pull test plug, install wear bushing
21 :30 - 23:30 2.00 CASE N DPRB PROD2 RU pipe handling equip. PU & strap BHA componets.
23:30 - 00:00 0.50 CASE N DPRB PROD2 MU clean out BHA
2/15/2002 00:00 - 01 :00 1.00 CASE N DPRB PROD2 PU, MU, clean out BHA,
01 :00 - 03:30 2.50 CASE N DPRB PROD2 PU, MU, 2 7/8" drillpipe, 60 jts, from shed
03:30 - 12:00 8.50 CASE N DPRB PROD2 PU, MU, 4" HT-38 drillpipe from shed
12:00 - 12:30 0.50 CASE N DPRB PROD2 Rig service,
12:30 - 13:00 0.50 CASE N DPRB PROD2 Change elevators, trip in 5" drillpipe from derrick
13:00 -13:30 0.50 CASE N DPRB PROD2 Attempt to break circulation, system frozen
13:30 - 00:00 10.50 CASE N RREP PROD2 Rig repair, thaw out standpipe, kelly hose, top drive
2/16/2002 00:00 - 06:00 6.00 CASE N RREP PROD2 Thaw out standpipe, kelly hose, top drive
06:00 - 07:30 1.50 CASE N RREP PROD2 Blow down circ system wI air, steam
07:30 - 10:30 3.00 CASE N DPRB PROD2 Trip in to 14,868'
10:30 - 19:30 9.00 CASE N DPRB PROD2 Mill on junk at Landing collar, chase down to 14,911',
float collar, mill through, chase down to 14,950', float
shoe, mill through
19:30 - 20:00 0.50 CASE N DPRB PROD2 Trip in 2 stands into open hole, push junk into open hole
20:00 - 22:00 2.00 CASE N DPRB PROD2 Wash in to 15,157', push junk into open hole, drop dart
to open circ sub, pump sweep, stage up to 7 bpm,
losses of 1 bpm, stage pump down to 4 bpm,
22:00 - 22:30 0.50 CASE N DPRB PROD2 Trip out 3 stands to inside 5" casing
22:30 - 23:30 1.00 CASE N DPRB PROD2 Circulate to condition mud, bring sweep to surface
23:30 - 00:00 0.50 CASE N DPRB PROD2 Flow check, hole static, pump dry job, blowdown top drive
2/17/2002 00:00 - 06:00 6.00 CASE N DPRB PROD2 Trip out mill BHA
06:00 - 08:00 2.00 CASE N DPRB PROD2 Trip out 2 7/8" drillpipe to derrick, LD mill BHA
08:00 - 08:30 0.50 CASE N DPRB PROD2 Clean rig floor
08:30 - 12:00 3.50 CASE N DPRB PROD2 MU mule shoe, PU, MU, 2 7/8" DP from pipe shed, 1 x 1,
drift
12:00 - 12:30 0.50 CASE N DPRB PROD2 Rig service
12:30 - 14:30 2.00 CASE N DPRB PROD2 Con't PU, MU, 27/8" drillpipe, total 99 jts
14:30 - 15:30 1.00 CASE N DPRB PROD2 Trip in 27/8" drillpipe from derrick
15:30 - 20:00 4.50 CASE N DPRB PROD2 Trip in 4" and 5" DP from derrick
20:00 - 20:30 0.50 CASE N DPRB PROD2 Wash down junk in casing at 14,476'
20:30 - 21 :00 0.50 CASE N DPRB PROD2 Trip in from 14,476' to 14,890'
21 :00 - 22:30 1.50 CASE N DPRB PROD2 Rig service, slip I cut drilling line, service top drive
Circulate well bore at 3.5 bpm at 1500 psi, no losses
22:30 - 00:00 1.50 CASE N DPRB PROD2 Wash down open wellbore, 20 RPM, 35 SPM, 3.5 bpm
at 1550 psi, Torque at 7,000, slight wellbore hang ups
2/18/2002 00:00 - 05:00 5.00 CASE N DPRB PROD2 Wash to bottom
05:00 - 18:30 13.50 CASE N DPRB PROD2 Circ and condition mud, 20 spm = 1 bblloss, circ 30 bbl LCM
pill, circ 20 bpm = 0.5 bpm loss, mix LCM, drop mud weight to
10.3 ppg, 30 spm = 0.2 bpm loss at 1420 psi, circ 5 bpm wI no
loss at 2100 psi
18:30 - 19:30 1.00 CASE N DPRB PROD2 PT cement lines, cement plug as per program
19:30 - 21:00 1.50 CASE N DPRB PROD2 Trip out to 16,500', control speed to 2 minutes I stand
21 :00 - 00:00 3.00 TA N DPRB ABAN Circ and condition mud, drop weight to 10.0 ppg,
overboard 45 bbls cement contaminated mud, 5 bpm at
2000 psi wI no losses
2/19/2002 00:00 - 02:30 2.50 TA X DPRB ABAN Circulate and condition mud.
02:30 - 03:30 1.00 TA X DPRB ABAN Pump 15 bbls water, 144 bbls 15.9 ppg mud, 5 bbls water.
Displace with 10.0 ppg mud.
03:30 - 04:30 1.00 TA X DPRB ABAN POH to 14,950'.
04:30 - 06:00 1.50 TA X DPRB ABAN Pump 50 bbls water, 155 bbls 10.0 ppg mud. RIH to 15,145'.
Printed: 212512002 2:32:10 PM
.~
~
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
NK-11
NK-11A
REENTER+COMPLETE
DOYON
DOYON 14
Start: 1/12/2002
Rig Release:
Rig Number:
Spud Date: 11/5/1997
End:
2119/2002 06:00 - 11 :00 5.00 TA X DPRB ABAN Circulate and condition mud.
11 :00 - 12:30 1.50 TA X DPRB ABAN RU Schlumberger cement unit. Test lines to 3,500 psi. Pump
15 bbls water, 32 bbls 15.8 ppg class G cement, 5 bbls water
and displace.
12:30 - 13:30 1.00 TA X DPRB ABAN POH from 15,145' to 14,188' at controlled speed of 2 minutes
per stand.
13:30 - 16:30 3.00 TA X DPRB ABAN Circulate and condition mud to 10.0 ppg in and out at 4.5 bpm,
1,190 psi.
16:30 - 20:00 3.50 TA X DPRB ABAN LD 114 joints of 5" DP from derrick in mouse hole while WOC.
20:00 - 00:00 4.00 TA X DPRB ABAN Circulate and condition mud at 3 bpm, 800 psi. wac.
2/20/2002 00:00 - 01 :00 1.00 TA X DPRB ABAN Attempt to pressure test cement plug. Pressured up to 2,500
psi and pressure bled off. Checked surface equipment and
attempted to pressure test plug.
Able to pump at 590 psi, 1 bpm.
01 :00 - 03:00 2.00 TA X DPRB ABAN Wash down to 14,984'. Did not tag cement.
03:00 - 06:00 3.00 TA X DPRB ABAN CBU. Flow check. Well static. Pump dry job.
06:00 - 08:00 2.00 TA X DPRB ABAN POH to 11,538'. Hole not taking right fill. Mud out of balance.
08:00 - 10:00 2.00 TA X DPRB ABAN Circulate to balance fluid, 10 ppg in and out.
10:00 -15:30 5.50 TA X DPRB ABAN POH.
15:30 - 16:00 0.50 TA X DPRB ABAN LD mule shoe, PU cement retainer, clear rig floor. MU cement
retainer.
16:00 - 16:30 0.50 TA X DPRB ABAN RIH w/2 7/8" DP. Check for cement inside DP. Large amount
of cement sheath inside pipe. POH. LD cement retainer and
running tool.
16:30 - 21 :00 4.50 TA X DPRB ABAN RIH w/2 7/8" DP and LD 33 stands.
21 :00 - 00:00 3.00 TA X DPRB ABAN RIHw/4"DP.
2/21/2002 00:00 - 04:00 4.00 TA X DPRB ABAN RIH with 4" DP from derrick. PU 96 joints of 5" DP from pipe
shed.
04:00 - 05:00 1.00 TA X DPRB ABAN Slip and cut drilling line. Service top drive.
05:00 - 07:00 2.00 TA X DPRB ABAN RIH wI 5" DP from derrick to 14,100'.
07:00 - 08:00 1.00 TA X DPRB ABAN Set cement retainer. Pump 7 bbls and establish an injection
rate of 3 bpm, 1,300 psi. Test annulus to 2,500 psi for 10
minutes. Liner lap holding pressure. Unsting from retainer and
obtain up and down weight with bag shut and circultion rate
and pressure through choke.
08:00 - 10:00 2.00 TA X DPRB ABAN RU to cement. Test lines to 3,500 psi. Pump 10 bbls water, 39
bbls 15.8 ppg class G cement, 10 bbls water. Displace with
102 bbls of 10 ppg mud, leaving cement 30 bbls from exiting
DP. Sting into cement retainer and pump 62 bbls. Unsting
from retainer. Leave 7 bbls of cement on top of retainer.
10:00 -10:30 0.50 TA X DPRB ABAN POH to 13,600'.
10:30-11:30 1.00 TA X DPRB ABAN CBU.
11:30-12:00 0.50 TA X DPRB ABAN Test casing to 2,500 psi for 30 minutes.
12:00 - 12:30 0.50 TA X DPRB ABAN Blow down kill line. RU for displacement. Pump high viscosity
spacer.
12:30 - 14:30 2.00 TA X DPRB ABAN Displace well to sea water at 7.3 bpm, 2460 psi. Rotate and
reciprocate pipe at 30 rpm, 9K ft*lbs torque.
14:30 - 20:30 6.00 TA X DPRB ABAN POH sideways.
20:30 - 21 :00 0.50 TA X DPRB ABAN RIH with 5" DP from derrick and LD same.
21 :00 - 00:00 3.00 TA X DPRB ABAN Continue to LD 4" DP. Change handling equipment for 2 7/8"
DP.
2/22/2002 00:00 - 01 :30 1.50 TA X DPRB ABAN Fin POH LD 2 7/8" DP
01 :30 - 02:00 0.50 TA X DPRB ABAN LD retainer running tool. Clear rig floor
Printed: 212512002 2:32:10 PM
r--..
~
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
NK-11
NK-11A
REENTER+COMPLETE
DOYON
DOYON 14
Start: 1/12/2002
Rig Release:
Rig Number:
Spud Date: 11/5/1997
End:
2122/2002 02:00 - 02:30 0.50 TA X DPRB ABAN Pull wear bushing
02:30 - 05:00 2.50 TA X DPRB ABAN RU & RIH wI 2227 ft 4 1/2" kill string
05:00 - 06:00 1.00 TA P ABAN MU tbg hng. land same. RllDS
06:00 - 07:30 1.50 TA P ABAN ND BOPE
07:30 - 08:30 1.00 TA P ABAN NU adapter flange and tree. Test same 5000 psi /10 mins
08:30 - 11 :00 2.50 TA P ABAN RU hot oil unit. Test lines 3500 psi. Freeze protect well to 2227
ft. RD hot oil unit.
11:00-15:00 4.00 TA P ABAN Secure well head. Clean mud pits I slop tank. Release rig for
move to Z 39
Printed: 212512002 2:32:10 PM
~
~
óì Cb)... Q ùc::l
22-Feb-02
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well NK-11A PB1
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 10,694.05' MD
Window / Kickoff Survey 10,699.00' MD
Projected Survey: 17,535.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
t .1 ~ '"' ;¡ ! t;OQ?
'-."" " I' L.
¡ .: \;, .. .,' -
Alaska Oil Ii Gas Cons. Commission
AnctlOœge
DEFINITIVE
'-
North Slope Alaska
BPXA
NIAKUK, Slot NK-11
NK-11APB1
Job No. AKZZ22005, Surveyed: 3 February, 2002
)
SURVEY REPORT
22 February, 2002
Your Ref: API 500292278970
Surface Coordinates: 5979846.80 N, 721541.89 E (70020' 50.0070" N, 148012' 05.0297" W)
Kelly Bushing: 53. 85ft above Mean Sea Level
........
)
!51::81!! rara Y -SUI!
pRILL.ING SERVIces
A Halliburton Company
Survey Ref: svy11111
Sperry-Sun Drilling Services "
Survey Report for NK-11APB1
Your Ref: API 500292278970
Job No. AKZZ22005, Surveyed: 3 February, 2002
BPXA
North Slope Alaska NIAKUK
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
",-. 10694.05 74.620 323.150 5699.84 5753.69 6150.36 N 3734.26 W 5985884.09 N 717627.46 E 4028.17 Tie On Point )
AK-6 BP IFR-AK
10699.00 74.650 323.150 5701.16 5755.01 6154.18 N 3737.12 W 5985887.82 N 717624.48 E 0.606 4031.21 Window Point
10751.97 72.400 319.050 5716.18 5770.03 6193.71 N 3769.00 W 5985926.39 N 717591.45 E 8.551 4064.97
10784.40 70.440 316.510 5726.52 5780.37 6216.47 N 3789.65 W 5985948.53 N 717570.13 E 9.573 4086.70
10816.89 68.880 313.920 5737.81 5791.66 6238.09 N 3811.11 W 5985969.51 N 717548.05 E 8.884 4109.18
10848.30 68.010 311.370 5749.35 5803.20 6257.88 N 3832.59 W 5985988.66 N 717525.99 E 8.042 4131.60
10880.94 68.080 310.750 5761.56 5815.41 6277.77 N 3855.42 W 5986007.86 N 717502.59 E 1.775 4155.36
10913.58 67.490 308.920 5773.90 5827.75 6297.12N 3878.62 W 5986026.52 N 717478.82 E 5.496 4179.47 .
10943.91 66.750 307.770 5785.69 5839.54 6314.46 N 3900.54 W 5986043.20 N 717456.40 E 4.261 4202.20
10977.20 66.560 306.690 5798.88 5852.73 6332.95 N 3924.87 W 5986060.97 N 717431.53 E 3.033 4227.41
11008.44 66.270 304.570 5811.38 5865.23 6349.63 N 3948.14 W 5986076.95 N 717407.78 E 6.288 4251.46
11038.92 65.340 303.740 5823.88 5877.73 6365.24 N 3971.15 W 5986091.87 N 717384.32 E 3.934 4275.19
11073.40 64.690 301.970 5838.44 5892.29 6382.20 N 3997.40 W 5986108.04 N 717357.58 E 5.020 4302.24
11109.09 63.270 300.500 5854.10 5907.95 6398.83 N 4024.82 W 5986123.86 N 717329.68 E 5.434 4330.43
11136.39 62.620 299.250 5866.51 5920.36 6410.94 N 4045.90 W 5986135.34 N 717308.25 E 4.722 4352.08
11170.78 61.220 298.600 5882.70 5936.55 6425.61 N 4072.46 W 5986149.23 N 717281.27 E 4.399 4379.31
'- 11202.81 60.490 296.620 5898.30 5952.15 6438.58 N 4097.24 W 5986161.45 N 717256.12 E 5.860 4404.70
11231.77 59.380 296.610 5912.81 5966.66 6449.81 N 4119.65W 5986172.01 N 717233.39 E 3.833 4427.62 )
11267.59 58.470 295.280 5931.30 5985.15 6463.23 N 4147.23 W 5986184.62 N 717205.42 E 4.070 4455.83
11297.75 57.500 292.970 5947.29 6001.14 6473.68 N 4170.57 W 5986194.37 N 717181.78 E 7.247 4479.64
11327.43 57.250 290.230 5963.29 6017.14 6482.89 N 4193.81 W 5986202.89 N 717158.28 E 7.820 4503.30
11360.33 56.890 288.820 5981.18 6035.03 6492.12 N 4219.83 W 5986211.34 N 717132.00 E 3.760 4529.74
11394.02 56.810 286.510 5999.60 6053.45 6500.67 N 4246.71 W 5986219.10 N 717104.88 E 5.745 4557.00
11422.62 56.620 284.230 6015.30 6069.15 6507.01 N 4269.76 W 5986224.75 N 717081.65 E 6.697 4580.33
11457.96 56.280 279.520 6034.84 6088.69 6513.07 N 4298.57 W 5986229.96 N 717052.68 E 11.148 4609.40
11489.83 55.870 276.810 6052.63 6106.48 6516.83 N 4324.74 W 5986232.94 N 717026.41 E 7.172 4635.72
11518.06 55.970 274.950 6068.45 6122.30 6519.22 N 4347.99 W 5986234.65 N 717003.09 E 5.469 4659.07
11554.17 54.960 271.770 6088.92 6142.77 6520.97 N 4377.68 W 5986235.52 N 716973.36 E 7.775 4688.81
11586.19 53.900 271.240 6107.55 6161.40 6521.66 N 4403.72 W 5986235.43 N 716947.32 E 3.574 4714.84
11614.37 52.940 270.030 6124.34 6178.19 6521.91 N 4426.35 W 5986235.02 N 716924.69 E 4.847 4737.46
22 February, 2002 - 10:53
Page 20(6
Dril/Quest 2.00.08.005
Sperry-Sun Drilling Services f)
Survey Report for NK-11APB1
Your Ref: API 500292278970
Job No. AKZZ22005, Surveyed: 3 February, 2002
BPXA
North Slope Alaska NIAKUK
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth locI. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
....... 11646.60 51.500 268.760 6144.09 6197.94 6521.64 N 4451.82 W 5986234.00 N 716899.24 E 5.446 4762.88 )
11678.30 51.240 267.010 6163.88 6217.73 6520.73 N 4476.56 W 5986232.35 N 716874.53 E 4.390 4787.56
11710.11 51.510 267.300 6183.74 6237.59 6519.50 N 4501.38 W 5986230.39 N 716849.76 E 1.108 4812.29
11804.75 52.650 265.040 6241.90 6295.75 6514.50 N 4575.86 W 5986223.19 N 716775.46 E 2.236 4886.44
11901.25 50.260 266.060 6302.03 6355.88 6508.63 N 4651.10 W 5986215.10 N 716700.43 E 2.611 4961.31
11929.03 50.040 265.910 6319.83 6373.68 6507.14 N 4672.38 W 5986212.98 N 716679.20 E 0.894 4982.48
12023.81 49.660 266.220 6380.94 6434.79 6502.17 N 4744.65 W 5986205.87 N 716607.11 E 0.472 5054.43
12118.86 49.160 265.660 6442.79 6496.64 6497.06 N 4816.65 W 5986198.64 N 716535.29 E 0.691 5126.10
12214.26 49.340 266.700 6505.06 6558.91 6492.24 N 4888.76 W 5986191.70 N 716463.36 E 0.847 5197.89
12310.56 49.400 267.360 6567.77 6621.62 6488.46 N 4961.75 W 5986185.75 N 716390.52 E 0.524 5270.60
12406.38 48.990 267.180 6630.39 6684.24 6485.00 N 5034.19 W 5986180.16 N 716318.20 E 0.451 5342.80
12502.10 49.330 266.950 6692.98 6746.83 6481.29 N 5106.51 W 5986174.31 N 716246.02 E 0.399 5414.85
12597.10 50.490 266.840 6754.16 6808.01 6477.36 N 5179.08 W 5986168.23 N 716173.60 E 1.224 5487.15
12694.39 51.430 265.690 6815.44 6869.29 6472.43 N 5254.49 W 5986161.08 N 716098.38 E 1.333 5562.22
12789.71 52.770 265.380 6873.99 6927.84 6466.57 N 5329.47 W 5986153.01 N 716023.60 E 1.429 5636.84
12886.38 53.530 265.050 6931.97 6985.82 6460.12 N 5406.56 W 5986144.28 N 715946.74 E 0.832 5713.52
12982.01 54.190 265.730 6988.37 7042.22 6453.91 N 5483.53 W 5986135.80 N 715869.98 E 0.898 5790.10
I...... 13077.65 54.210 264.740 7044.31 7098.16 6447.47 N 5560.84 W 5986127.08 N 715792.90 E 0.840 5867.00 )
13173.63 54.490 266.620 7100.26 7154.11 6441.60 N 5638.60 W 5986118.91 N 715715.34 E 1.618 5944.39
13269.55 54.600 266.440 7155.90 7209.75 6436.87 N 5716.59 W 5986111.87 N 715637.53 E 0.191 6022.06
13365.47 57.640 262.490 7209.38 7263.23 6429.14 N 5795.81 W 5986101.81 N 715558.57 E 4.661 6100.81
13461.70 61.180 262.240 7258.34 7312.19 6418.13 N 5877.90 W 5986088.38 N 715476.84 E 3.685 6182.27
13557.36 61.340 262.300 7304.34 7358.19 6406.85 N 5961.02 W 5986074.65 N 715394.09 E 0.176 6264.74
13653.99 61.110 261.480 7350.85 7404.70 6394.90 N 6044.87 W 5986060.23 N 715310.63 E 0.781 6347.91
13749.60 60.580 262.020 7397.43 7451.28 6382.92 N 6127.50 W 5986045.81 N 715228.39 E 0.742 6429.87
13844.55 60.430 261.960 7444.18 7498.03 6371.41 N 6209.34 W 5986031.88 N 715146.93 E 0.167 6511.05
13940.81 61.420 263.760 7490.96 7544.81 6360.96 N 6292.81 W 5986018.96 N 715063.80 E 1.931 6593.92
14037.49 61.020 264.760 7537.51 7591 .36 6352.48 N 6377.12 W 5986008.00 N 714979.78 E 0.997 6677.72
14133.12 60.810 264.910 7583.99 7637.84 6344.96 N 6460.35 W 5985998.02 N 714896.81 E 0.259 6760.49
14230.07 60.880 264.680 7631.22 7685.07 6337.28 N 6544.67 W 5985987.85 N 714812.75 E 0.219 6844.33
22 February, 2002 - 10:53
Page 3 0'6
DrillOllest 2.00.08.005
Sperry-Sun Drilling Services f)
Survey Report for NK-11APB1
Your Ref: API 500292278970
Job No. AKZZ22005, Surveyed: 3 February, 2002
BPXA
North Slope Alaska NIAKUK
Measured Sub-Sea Vertical local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
~. 14326.49 61.510 265.910 7677.68 7731.53 6330.35 N 6628.87 W 5985978.43 N 714728.79 E 1.295 6928.10 )
14421.93 60.760 265.140 7723.76 7777.61 6323.83 N 6712.20 W 5985969.46 N 714645.70 E 1.057 7011.01
14517.83 61.610 267.750 7769.98 7823.83 6318.63 N 6796.05 W 5985961.78 N 714562.03 E 2.544 7094.51
14613.62 60.420 267.600 7816.40 7870.25 6315.23 N 6879.77 W 5985955.91 N 714478.45 E 1.250 7177.97
14709.27 61.770 267.060 7862.63 7916.48 6311.33 N 6963.41 W 5985949.53 N 714394.96 E 1.495 7261.32
14804.86 60.910 268.500 7908.48 7962.33 6308.07 N 7047.22 W 5985943.80 N 714311.28 E 1.599 7344.88
14901.05 61.160 268.720 7955.06 8008.91 6306.03 N 7131.36 W 5985939.27 N 714227.24 E 0.328 7428.81
14996.84 61.860 268.440 8000.76 8054.61 6303.94 N 7215.52 W 5985934.70 N 714143.18 E 0.775 7512.78
15092.08 61.140 267.600 8046.20 8100.05 6301.05 N 7299.17 W 5985929.34 N 714059.66 E 1.083 7596.19
15186.97 60.530 268.910 8092.44 8146.29 6298.53 N 7381.99 W 5985924.37 N 713976.95 E 1.366 7678.78
15283.89 61.100 267.680 8139.71 8193.56 6296.01 N 7466.56 W 5985919.35 N 713892.48 E 1.254 7763.14
15378.56 60.450 267.480 8185.93 8239.78 6292.52 N 7549.11 W 5985913.42 N 713810.08 E 0.711 7845.42
15473.85 62.080 267.220 8231.74 8285.59 6288.66 N 7632.57 W 5985907.09 N 713726.77 E 1.727 7928.59
15569.77 62.990 269.350 8275.98 8329.83 6286.12 N 7717.63 W 5985902.04 N 713641.81 E 2.187 8013.43
15665.33 62.780 267.990 8319.54 8373.39 6284.14 N 7802.66 W 5985897.55 N 713556.88 E 1.286 8098.27
15761.38 61.610 269.920 8364.34 8418.19 6282.59 N 7887.60 W 5985893.48 N 713472.02 E 2.155 8183.03
15857.07 60.620 268.680 8410.57 8464.42 6281.57 N 7971.38 W 5985889.99 N 713388.31 E 1.535 8266.66
15953.27 62.220 268.370 8456.59 8510.44 6279.39 N 8055.83 W 5985885.32 N 713303.97 E 1.687 8350.90
""" 16049.52 61.700 268.810 8501.83 8555.68 6277.30 N 8140.75 W 5985880.72 N 713219.14 E 0.674 8435.63 )
16144.89 63.000 269.190 8546.09 8599.94 6275.83 N 8225.22 W 5985876.75 N 713134.76 E 1.408 8519.92
16241.45 63.640 271.700 8589.45 8643.30 6276.50 N 8311.48 W 5985874.87 N 713048.51 E 2.415 8606.12
16337.50 63.990 271.350 8631.84 8685.69 6278.79 N 8397.64 W 5985874.62 N 712962.32 E 0.490 8692.29
16432.83 64.950 273.150 8672.92 8726.77 6282.18 N 8483.59 W 5985875.46 N 712876.30 E 1.979 8778.30
16528.87 66.590 273.840 8712.34 8766.19 6287.52 N 8571.01 W 5985878.22 N 712788.77 E 1.829 8865.87
16624.63 65.860 278.650 8750.96 8804.81 6297.04 N 8658.09 W 5985885.16 N 712701.45 E 4.659 8953.31
16720.50 65.710 279.170 8790.28 8844.13 6310.58 N 8744.46 W 5985896.14 N 712614.71 E 0.519 9040.24
16815.94 65.870 280.590 8829.42 8883.27 6325.52 N 8830.22 W 5985908.53 N 712528.55 E 1.367 9126.62
16910.06 65.880 280.880 8867.89 8921.74 6341.52 N 8914.61 W 5985922.03 N 712443.72 E 0.281 9211.69
17006.04 65.500 280.950 8907.41 8961 .26 6358.08 N 9000.50 W 5985936.05 N 712357.38 E 0.401 9298.28
17046.58 65.450 281.770 8924.23 8978.08 6365.34 N 9036.66 W 5985942.24 N 712321.02 E 1.844 9334.75
22 February, 2002 - 10:53
Page4of6
DrillQuest 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for NK-11APB1
Your Ref: API 500292278970
Job No. AKZZ22005, Surveyed: 3 February, 2002
(I
BPXA
North Slope Alaska NIAKUK
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
'- 17100.74 64.760 282.770 8947.03 9000.88 6375.78 N 9084.66 W 5985951.26 N 712272.73 E 2.104 9383.20 )
17199.34 65.670 281.370 8988.37 9042.22 6394.50 N 9172.20 W 5985967.37 N 712184.68 E 1.585 9471.54
17291.89 67.440 280.450 9025.19 9079.04 6410.56 N 9255.57 W 5985980.97 N 712100.87 E 2.119 9555.60
17390.65 67.930 281.720 9062.69 9116.54 6428.13 N 9345.23 W 5985995.88 N 712010.73 E 1.289 9646.00
17500.42 69.020 281.450 9102.97 9156.82 6448.63 N 9445.26 W 5986013.42 N 711910.14 E 1.019 9746.91
17535.00 69.020 281.450 9115.35 9169.20 6455.04 N 9476.90 W 5986018.89 N 711878.32 E 0.000 9778.83 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Magnetic Declination at Surface is 26.746° (14-Jan-02)
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 272.780° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 17535.00ft.,
The Bottom Hole Displacement is 11466.44ft., in the Direction of 304.260° (True).
"-
)
22 February, 2002 - 10:53
Page 5 0'6
Dril/Quest 2.00.08.005
North Slope Alaska
Comments
L
Measured
Depth
(ft)
10694.05
10699.00
17535.00
Sperry-Sun Drilling Services
Survey Report for NK-11APB1
Your Ref: API 500292278970
Job No. AKZZ22005, Surveyed: 3 February, 2002
I)
6150.36 N
6154.18 N
6455.04 N
Survey tool program for NK-11APB1
BPXA
NIAKUK
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
5753.69
5755.01
9169.20
From
Measured Vertical
Depth Depth
(ft) (ft)
0.00
10694.05
\..-
22 February, 2002 - 10:53
0.00
5753.69
To
Measured Vertical
Depth Depth
(ft) (ft)
10694.05
17535.00
5753.69
9169.20
Comment
)
3734.26 W
3737.12 W
9476.90 W
Tie On Point
Window Point
Projected Survey
Survey Tool Description
AK-1 BP _HG (NK-11)
AK-6 BP _IFR-AK (NK-11APB1)
)
Page 6 0'6
DrillQuest 2.00.08.005
~
~
q oa~OQ;)
22-Feb-02
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well NK-11A PB1 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 10,694.05' MD
Window / Kickoff Survey 10,699.00' MD (if applicable)
Projected Survey: 17,535.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
tl .\:¡ ;-¡ ~ 'JOO?
L:-\\\ v !;. L. -
Alaska Oil & Gas Cons. Commission
AnOOorage
North Slope Alaska
BPXA
NIAKUK, Slot NK-11
NK-11APB1 MWD
Job No. AKMW22005, Surveyed: 3 February, 2002
)
SURVEY REPORT
22 February, 2002
Your Ref: API 500292278970
Surface Coordinates: 5979846.80 N, 721541.89 E (70020' 50.0070" N, 148012'05.0297" W)
Kelly Bushing: 53. 85ft above Mean Sea Level
)
ssp &1""'1"'" Y -!SUI!
DRILLING seRVices
A Halliburton Company
Survey Ref: svy11112
Sperry-Sun Drilling Services "
Survey Report for NK.11APB1 MWD
Your Ref: API 500292278970
Job No. AKMW22005, Surveyed: 3 February, 2002
BPXA
North Slope Alaska NIAKUK
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth locI. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
10694.05 74.620 323.150 5699.84 5753.69 6150.36 N 3734.26 W 5985884.09 N 717627.46 E 4028.17 Tie On Point )
MWD Magnetic
10699.00 74.650 323.150 5701.16 5755.01 6154.18 N 3737.12 W 5985887.82 N 717624.48 E 0.606 4031.21 Window Point
10751.97 72.400 319.050 5716.18 5770.03 6193.71 N 3769.00 W 5985926.39 N 717591.45 E 8.551 4064.97
10784.40 70.440 316.510 5726.52 5780.37 6216.47 N 3789.65 W 5985948.53 N 717570.13 E 9.573 4086.70
10816.89 68880 313.920 5737.81 5791.66 6238.09 N 3811.11 W 5985969.51 N 717548.05 E 8.884 4109.18
10848.30 68.010 312.990 5749.35 5803.20 6258.19 N 3832.31 W 5985988.97 N 717526.26 E 3.906 4131.33
10880.94 68.080 309.010 5761.56 5815.41 6278.04 N 3855.16W 5986008.14 N 717502.84 E 11.311 4155.11
10913.58 67.490 307.200 5773.90 5827.75 6296.69 N 3878.93 W 5986026.08 N 717478.53 E 5.443 4179.76
10943.91 66.750 305.890 5785.69 5839.54 6313.33 N 3901.38 W 5986042.05 N 717455.59 E 4.668 4202.99
10977.20 66.560 304.940 5798.89 5852.74 6331.04 N 3926.29 W 5986059.01 N 717430.17 E 2.682 4228.73
11008.44 66.270 303.280 5811.39 5865.24 6347.09 N 3949.99 W 5986074.36 N 717406.01 E 4.957 4253.19
11038.92 65.340 302.700 5823.88 5877.73 6362.23 N 3973.31 W 5986088.80 N 717382.25 E 3.510 4277.21
11073.40 64.690 300.980 5838.44 5892.29 6378.72 N 3999.86 W 5986104.50 N 717355.22 E 4.899 4304.53
11109.09 63.270 299.710 5854.10 5907.95 6394.93 N 4027.54 W 5986119.88 N 717327.08 E 5.104 4332.96
11136.39 62.620 298.570 5866.52 5920.37 6406.76 N 4048.77 W 5986131.08 N 717305.51 E 4.416 4354.74
11170.78 61 .220 298.000 5882.70 5936.55 6421.14 N 4075.49 W 5986144.67 N 717278.38 E 4.326 4382.12
11202.81 60.490 296.130 5898.30 5952.15 6433.87 N 4100.40 W 5986156.65 N 717253.10 E 5.585 4407.62
11231.77 59.380 296.240 5912.81 5966.66 6444.93 N 4122.89 W 5986167.04 N 717230.29 E 3.847 4430.62 )
11267.59 58.470 294.760 5931.30 5985.15 6458.14 N 415D.58 W 5986179.43 N 717202.23 E 4.356 4458.92
11297.75 57.500 292.470 5947.29 6001.14 6468.39 N 4174.00 W 5986188.98 N 717178.51 E 7.196 4482.82
11327.43 57.250 290.160 5963.29 6017.14 6477.47 N 4197.29 W 5986197.37 N 717154.96 E 6.609 4506.51
11360.33 56.890 289.720 5981.18 6035.03 6486.89 N 4223.25 W 5986206.02 N 717128.74 E 1.568 453290
11394.02 56.810 286.920 5999.61 6053.46 6495.75 N 4250.02 W 5986214.09 N 717101.71 E 6.962 4560.07
11422.62 56.620 284.070 6015.30 6069.15 6502.14 N 4273.05 W 5986219.79 N 717078.50 E 8.356 4583.39
11457.96 56.280 278.490 6034.85 6088.70 6507.90 N 4301.92 W 5986224.69 N 717049.48 E 13.193 4612.50
11489.83 55.870 276.150 6052.63 6106.48 6511.27 N 4328.15 W 5986227.29 N 717023.16 E 6.227 4638.86
11518.06 55.970 274.490 6068.45 6122.30 6513.44 N 4351.43 W 5986228.77 N 716999.83 E 4.883 4662.21
11554.17 54.960 271.160 6088.93 6142.78 6514.91 N 4381.13W 5986229.36 N 716970.10 E 8.095 4691.95
11586.19 53.900 270.810 6107.55 6161.40 6515.36 N 4407.17 W 5986229.04 N 716944.05 E 3.428 4717.98
11G14.37 52.940 269.690 6124.35 6178.20 6515.46 N 4429.80 W 5986228.47 N 716921.43 E 4.668 4740.59
22 February, 2002 - 10:54
Page 2 of 6
DrillQuest 2.00.08.005
Sperry-Sun Drilling Services eJ.
Survey Report forNK-11APB1 MWD 'WI
Your Ref: API 500292278970
Job No. AKMW22005, Surveyed: 3 February, 2002
BPXA
North Slope Alaska NIAKUK
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth locI. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
'- 11646.60 51.500 268.510 6144.09 6197.94 6515.06 N 4455.27 W 5986227.32 N 716895.99 E 5.323 4766.01
11678.30 51.240 266.410 6163.88 6217.73 6513.96 N 4480.00 W 5986225.49 N 716871.29 E 5.240 4790.67 )
11710.11 51.510 267.750 6183.74 6237.59 6512.70N 4504.82W 5986223.49N 716846.52E 3.399 4815.39 '
11804.75 52.650 264.480 6241.91 6295,76 6507.63 N 4579.29 W 5986216.22 N 716772.24 E 2.980 4889.53
11901.25 50.260 266.460 6302.04 6355.89 6501.64N 4654.51W 5986208.02N 716697.22E 2.951 4964.37
11929.03 50.040 265.080 6319.84 6373.69 6500.07 N 4675.78 W 5986205.82 N 716676.01 E 3.895 4985.54
12023.81 49.660 263.920 6380.96 6434.81 6493.13N 4747.89W 5986196.75N 716604.14E 1.018 5057.23
12118.86 49.160 264.420 6442.80 6496.65 6485.80N 4819.70W 5986187.29N 716532.58E 0.661 5128.59
12214.26 49.340 266.430 6505.08 6558.93 6480.03 N 4891.73 W 5986179.40 N 716460.75 E 1.607 5200.26
12310.56 49.400 267.890 6567.79 6621.64 6476.41N 4964.72W 5986173.63N 716387.89E 1.152 5272.99
12406.38 48.990 266.630 6630.41 6684.26 6472.95 N 5037.17 W 5986168.02 N 716315.58 E 1.083 5345.19
12502.10 49.330 268.950 6693.01 6746.86 6470.16 N 5109.52 W 5986163.10 N 716243.35 E 1.868 5417.32
12597.10 50.490 265.760 6754.20 6808.05 6466.79 N 5182.10W 5986157.58 N 716170.90 E 2.844 5489.65
12694.39 51.430 266.040 6815.47 6869.32 6461.39N 5257.47W 5986149.96N 716095.72E 0.992 5564.67
12789.71 52.770 267.480 6874.03 6927.88 6457.15 N 5332.56 W 5986143.50 N 716020.78 E 1.843 5639.47
12886.38 53.530 268.140 6932.00 6985.85 6454.19 N 5409.86 W 5986138.26 N 715943.61 E 0.957 5716.53
12982.01 54.190 266.610 6988.40 7042.25 6450.65 N 5487.01 W 5986132.44 N 115866.60 E 1.465 5793.41
13077.65 54.210 268.050 7044.35 7098.20 6447.04 N 5564.49 W 5986126.54 N 715789.26 E 1.221 5870.63
13173.6354.490265.960 7100.30 7154.15 6442.96N 5642.37W 5986120.16N 715711.54E 1.7935948.22 )
13269.55 54.600 265.640 7155.94 7209.79 6437.24N 5720.29W 5986112.14N 715633.82E 0.295 6025.77
13365.47 57.640 265.290 7209.40 7263.25 6430.94N 5799.67W 5986103.49N 715554.66E 3.184 6104.75
13461.70 61.180 262.100 7258.37 7312.22 6421.80 N 5881.97W 5986091.93 N 715472.67 E 4.655 6186.51
13557.3661.340262.230 7304.37 7358.22 6410.37N 5965.06W 5986078.04N 715389.95E 0.2056268.95
13653.99 61.110 263.100 7350.88 7404.73 6399.55 N 6049.06 W 5986064.75 N 715306.30 E 0.824 6352.33
13749.60 60.580 263.280 7397.46 7451.31 6389.65N 6131.97W 5986052.40N 715223.72E 0.578 6434.66
13844.55 60.430 263.130 7444.21 7498.06 6379.88 N 6214.04 W 5986040.20 N 715141.98 E 0.209 651615
13940.81 61.420 263.900 7490.99 7544.84 6370.38 N 6297.62 W 5986028.24 N 715058.71 E 1.244 6599.18
14037.4961.020264.120 7537.54 7591.39 6361.53N 6381.90W 5986016.91N 714974.73E 0.4596682.93
14133.1260.810262.990 7584.02 7637.87 6352.15N 6464.94W 5986005.08N 714892.01E 1.0566765.42
14230.07 60.880 265.970 7631.26 7685.11 6344.01 N 6549.20 W 5985994.45 N 714808.02 E 2.685 6849.18
22 February, 2002 - 10:54
Page 3 0(6
DrillQuest 2.00.08.005
Sperry-Sun Drilling Services "
Survey Report for NK.11APB1 MWD
Your Ref: API 500292278970
Job No. AKMW22005, Surveyed: 3 February, 2002
BPXA
North Slope Alaska NIAKUK
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth locI. Azim. Depth Depth Northings Eastlngs Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
14326.49 61.510 267.970 7677.72 7731.57 6339.55 N 6633.57 W 5985987.49 N 714723.83 E 1.931 6933.23 )
14421.93 60.760 267.360 7723.80 7777.65 6336.15 N 6717.08 W 5985981.62 N 714640.45 E 0.965 7016.48
14517.83 61.610 266.740 7770.02 7823.87 6331.82 N 6800.99 W 5985974.82 N 714556.70 E 1.052 7100.09
14613.62 60.420 268.280 7816.44 7870.29 6328.17 N 6884.70 W 5985968.70 N 714473.14 E 1.876 7183.52
14709.27 61770 268.470 7862.67 7916.52 6325.80 N 6968.40 W 5985963.85 N 714389.55 E 1.422 7267.00
14804.86 60.910 267.010 7908.52 7962.37 6322.50 N 7052.21 W 5985958.07 N 714305.87 E 1.614 7350.55
14901.05 61.160 269.300 7955.11 8008.96 6319.79 N 7136.31 W 5985952.88 N 714221.89 E 2.099 7434.43
14996.84 61.860 268.820 8000.80 8054.65 6318.41 N 7220.49 W 5985949.01 N 714137.79 E 0.853 7518.44
15092.08 61.140 268.210 8046.24 8100.09 6316.24 N 7304.16 W 5985944.37 N 714054.22 E 0.943 7601.91
15186.97 60.530 266.390 8092.49 8146.34 6312.34 N 7386.92 W 5985938.03 N 713971.61 E 1.794 7684.38
15283.89 61.1 00 269.180 8139.76 8193.61 6309.08 N 7471.46 W 5985932.27 N 713887.20 E 2.581 7768.67
15378.56 60.450 267.110 8185.98 8239.83 6306.41 N 7554.03 W 5985927.16 N 713804.74 E 2.028 7851.01
15473.85 62.080 265.570 8231.79 8285.64 6301.07 N 7637.41 W 5985919.35 N 713721.56 E 2.221 7934.03
15569.77 62.990 266.260 8276.03 8329.88 6295.00 N 7722.30 W 5985910.79 N 713636.89 E 1.143 8018.53
15665.33 62.780 263.730 8319.59 8373.44 6287.59 N 7807.02 W 5985900.87 N 713552.42 E 2.367 8102.79
15761.38 61.610 267.870 8364.41 8418.26 6281.35 N 7891.73 W 5985892.13 N 713467.94 E 4.002 8187.09
15857.07 60.620 266.760 8410.63 8464.48 6277.43 N 7975.42 W 5985885.73 N 713384.40 E 1.450 8270.49
15953.27 62.220 266.780 8456.65 8510.50 6272.67 N 8059.76 W 5985878.48 N 713300.24 E 1.663 8354.50
16049.52 61.700 266.910 8501.90 8555.75 6267.99 N 8144.58 W 5985871.30 N 713215.59 E 0.553 8439.00 )
16144.89 63.000 269.390 8546.16 8600.01 6265.28 N 8229.00 W 5985866.09 N 713131.28E 2.676 8523.19
16241.45 63.640 272.340 8589.53 8643.38 6266.59 N 8315.26 W 5985864.85 N 713045.03 E 2.809 8609.41
16337.50 63.990 274.560 8631.91 8685.76 6271.78 N 8401.29 W 5985867.49 N 712958.88 E 2.106 8695.59
16432.83 64.950 274.690 8673.00 8726.85 6278.71 N 8487.03 W 5985871.89 N 712872.97 E 1.015 8781.57
16528.87 66.590 278.800 8712.43 8766.28 6289.01 N 8573.97 W 5985879.62 N 712785.76 E 4.259 8868.91
16624.63 65.860 279.710 8751.03 8804.88 6303.11 N 8660.46 W 5985891.15 N 712698.89 E 1.156 8955.98
16720.50 65.710 282.010 8790.36 8844.21 6319.58 N 8746.32 W 5985905.08 N 712612.58 E 2.194 9042.54
16815.94 65.870 281.750 8829.50 8883.35 6337.50 N 8831.51 W 5985920.47 N 712526.91 E 0.300 9128.49
16910.06 65.880 282.640 8867.97 8921.82 6355.64 N 8915.47 W 5985936.13 N 712442.45 E 0.863 9213.23
17006.04 65.500 283.400 8907.48 8961.33 6375.35 N 9000.69 W 5985953.30 N 712356.68 E 0.823 9299.30
17046.58 65.450 284.140 8924.31 8978.16 6384.13 N 9036.51 W 5985961.02 N 712320.62 E 1.665 9335.51
22 February, 2002 - 10:54
Page 4 of 6
DrillOllest 2.00.08.005
""C'
*i~J
.
Sperry-Sun Drilling Services
Survey Report for NK-11APB1 MWD
Your Ref: API 500292278970
Job No. AKMW22005, Surveyed: 3 February, 2002
BPXA
North Slope Alaska NIAKUK
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastlngs Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
17100.74 64.760 282.990 8947.11 9000.96 6395.65 N 9084.26 W 5985971.13 N 712272.54 E 2.309 9383.77 )
17199.34 65.670 281.540 8988.44 9042.29 6414.66 N 9171.73 W 5985987.54 N 712184.55 E 1.623 9472.06
17291.89 67.440 280.240 9025.27 9079.12 6430.70 N 9255.11 W 5986001.11 N 712100.73 E 2.306 9556.11
17390.65 67.930 278.960 9062.77 9116.62 6445.93 N 9345.19W 5986013.67 N 712010.24 E 1.298 9646.83
17500.42 69.020 280.620 9103.04 9156.89 6463.30 N 9445.81 W 5986028.06 N 711909.15E 1.722 9748.17
17535.00 69.020 280.620 9115.43 9169.28 6469.25 N 9477.55 W 5986033.07 N 711877.25 E 0.000 9780.16 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Magnetic Declination at Surface is 26.746° (14-Jan-02)
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 272.780° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 17535.00ft.,
The Bottom Hole Displacement is 11474.98ft., in the Direction of 304.317° (True).
)
22 February, 2002 . 10:54
Page 5 of 6
DrillQllest 2.00.08.005
North Slope Alaska
Comments
,-.
Measured
Depth
(ft)
10694.05
10699.00
17535.00
Sperry-Sun Drilling Services
Survey Report for NK-11APB1 MWD
Your Ref: API 500292278970
Job No. AKMW22005, Surveyed: 3 February, 2002
I)
6150.36 N
6154.18 N
6469.25 N
Survey tool program for NK-11APB1 MWD
BPXA
NIAKUK
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
5753.69
5755.01
9169.28
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
0.00
10694.05
22 February, 2002 - 10:54
0.00
5753.69
To
Measured Vertical
Depth Depth
(ft) (ft)
10694.05
17535.00
Comment
)
3734.26 W
3737.12 W
9477.55 W
Tie On Point
Window Point
Projected Survey
Survey Tool Description
5753.69 AK-1 BP _HG (NK-11)
9169.28 MWD Magnetic (NK-11APB1 MWD)
)
Page 6 0'6
DrillQuest 2.00.08.005
r--..
/"",
OJ D~--~
22-Feb-02
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well NK-11A
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 15,186.97' MD
Window / Kickoff Survey 15,266.00' MD
Projected Survey: 17,867.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
f .1 .~:) r; .~ I')OO?
,';:-\~... L' !, L -
Alaska Oil & Gas Cons. Commission
Anchorage
DEFINITIVE
"-
North Slope Alaska
BPXA
NIAKUK, Slot NK-11
NK-11A
Job No. AKZZ22005, Surveyed: 11 February, 2002
)
SURVEY REPORT
22 February, 2002
Your Ref: API 500292278901
Surface Coordinates: 5979846.80 H, 721541.89 E (70020' 50.0070" H, 148012' 05.0297" W)
Kelly Bushing: 53. 85ft above Mean Sea Level
)
....... -,-,1"'" Y - !!5Ur1
DAILLING seRVices
A Halliburton Company
Survey Ref: svy11113
Sperry-Sun Drilling Services (I
Survey Report for NK-11A
Your Ref: API 500292278901
Job No. AKZZ22005, Surveyed: 11 February, 2002
BPXA
North Slope Alaska NIAKUK
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
15186.97 60.530 268.910 8092.44 8146.29 6298.53 N 7381.99 W 5985924.37 N 713976.95 E 8663.69 Tie On Point )
15266.00 60.990 267.910 8131.05 8184.90 6296.61 N 7450.92 W 5985920.42 N 713908.10 E 1.248 8730.21 Window Point
15334.48 59.730 269.390 8164.92 8218.77 6295.21 N 7510.42 W 5985917.25 N 713848.67 E 2.629 8787.68
15413.08 57.150 273.730 8206.07 8259.92 6296.99 N 7577.34 W 5985917.06 N 713781.73 E 5.736 8853.12
15474.57 56.910 274.970 8239.53 8293.38 6300.91 N 7628.77 W 5985919.45 N 713730.20 E 1.736 8904.02
15571.01 60.050 278.140 8289.95 8343.80 6310.33 N 7710.42 W 5985926.45 N 713648.31 E 4.295 8985.57
15667.89 63.680 280.010 8335.63 8389.48 6323.82 N 7794.76 W 5985937.45 N 713563.61 E 4.115 9070.71
15762.63 63.830 283.700 8377.54 8431.39 6341.28 N 7877.90 W 5985952.44 N 713479.99 E 3.497 9155.62
15857.57 62.230 286.400 8420.60 8474.45 6363.23 N 7959.60 W 5985971.97 N 713397.67 E 3.044 9240.20
15953.17 61.240 285.680 8465.87 8519.72 6386.50 N 8040.52 W 5985992.83 N 713316.10 E 1.230 9324.33
16048.50 62.170 285.470 8511.06 8564.91 6409.03 N 8121.38 W 5986012.97 N 713234.61 E 0.995 9408.22
16144.23 62.260 285.170 8555.68 8609.53 6431.41 N 8203.06 W 5986032.92 N 713152.30 E 0.293 9492.88
16240.51 62.940 284.900 8599.99 8653.84 6453.58 N 8285.61 W 5986052.64 N 713069.13 E 0.749 9578.33
16336.32 63.630 283.770 8643.06 8696.91 6474.77 N 8368.53 W 5986071.37 N 712985.63 E 1.276 9663.91
16432.52 63.930 284.380 8685.57 8739.42 6495.76 N 8452.24 W 5986089.87 N 712901.33 E 0.649 9750.21
16528.05 64.600 284.360 8727.05 8780.90 6517.12 N 8535.60 W 5986108.76 N 712817.38 E 0.702 9836.26
16623.46 64.020 283.470 8768.41 8822.26 6537.79 N 8619.05 W 5986126.96 N 712733.35 E 1.037 9922.23 '
16719.63 64.560 282.660. 8810.13 8863.98 6557.38 N 8703.46 W 5986144.04 N 712648.40 E 0.944 10008.88
16815.46 63.730 282.890 8851.92 8905.77 6576.45 N 8787.56 W 5986160.62 N 712563.77 E 0.893 10095.10 J
16910.59 64.390 283.280 8893.53 8947.38 6595.81 N 8870.89 W 5986177.51 N 712479.91 E 0.786 10180.64
17007.25 64.400 283.430 8935.30 8989.15 6615.95 N 8955.70 W 5986195.13 N 712394.54 E 0.140 10267.81
17103.31 64.400 283.050 8976.81 9030.66 6635.79 N 9040.02 W 5986212.47 N 712309.67 E 0.357 10354.43
17198.51 65.010 283.490 9017.49 9071.34 6655.55 N 9123.80 W 5986229.74 N 712225.34 E 0.765 10440.50
17294.58 65.460 283.280 9057.73 9111.58 6675.74 N 9208.66 W 5986247.42 N 712139.92 E 0.509 10527.74
17390.20 65.980 282.810 9097.05 9150.90 6695.41 N 9293.57 W 5986264.57 N 712054.46 E 0.705 10614.89
17486.16 66.270 283.060 9135.89 9189.74 6715.06 N 9379.10 W 5986281.68 N 711968.40 E 0.385 10702.63
17517.58 66.440 282.980 9148.49 9202.34 6721.54 N 9407.14 W 5986287.33 N 711940.18 E 0.589 10731.41
17580.61 66.920 283.260 9173.44 9227.29 6734.68 N 9463.51 W 5986298.80 N 711883.44 E 0.864 10789.29
17676.22 67.800 283.590 9210.24 9264.09 6755.17 N 9549.34 W 5986316.74 N 711797.04 E 0.974 10877.53
17772.08 68.490 283.280 9245.93 9299.78 6775.84 N 9635.87 W 5986334.84 N 711709.94 E 0.780 10966.50
22 February, 2002 - 10:53
Page2of4
Dri/lQllest 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for NK-11A
Your Ref: API 500292278901
Job No. AKZZ22005, Surveyed: 11 February, 2002
North Slope Alaska
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
',,- 17817.45 68.840 283.240 9262.44 9316.29
17867.00 68.840 283.240 9280.32 9334.17
Local Coordinates
Northings Eastlngs
(ft) (ft)
Global Coordinates
Northlngs Eastings
(ft) (ft)
6785.53 N
6796.12 N
9677.01 W
9721.99 W
5986343.32 N
5986352.57 N
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Magnetic Declination at Surface is 26.746° (14-Jan-02)
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 283.700° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 17867.00ft.,
The Bottom Hole Displacement is 11861.88ft., in the Direction of 304.955° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
15186.97
15266.00
17867.00
8146.29
8184.90
9334.17
6298.53 N
6296.61 N
6796.12 N
7381.99 W
7450.92 W
9721.99W
Tie On Point
Window Point
Projected Survey
22 February, 2002 . 10:53
Page30f4
711668.53 E
711623.26 E
Dogleg
Rate
(0/100ft)
Vertical
Section
0.77611008.76
0.000 11054.97
I)
BPXA
NIAKUK
Comment
Projected Survey
)
)
DrillQuest 2.00.08.005
North Slope Alaska
Survey tool program for NK-11A
.~
From
Measured Vertical
Depth Depth
(ft) (ft)
0.00
10694.05
0.00
5753.69
22 February, 2002 - 10:53
To
Measured Vertical
Depth Depth
(ft) (ft)
Sperry-Sun Drilling Services
Survey Report for NK-11A
Your Ref: API 500292278901
Job No. AKZZ22005, Surveyed: 11 February, 2002
I)
BPXA
NIAKUK
Survey Tool Description
10694.05
17867.00
5753.69 AK-1 BP _HG (NK-11)
9334.17 AK-6 BP _IFR-AK (NK-11APB1)
Page 4 0'4
DriflQuest 2.00.08.005
)
)
.~
,~
aOd~oo~
22-Feb-02
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well NK-11A MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey: 15,186.97' MD
Window / Kickoff Survey 15,266.00' MD
Projected Survey: 17,867.00' MD
(if applicable)
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
! ~ '" "', . " .'O?
, '..t..' U t. ,. U
. ,. \.' . ,- -
Alaska Oil & Gas Cons. Commission
Anchorage
North Slope Alaska
BPXA
NIAKUK, Slot NK-11
NK-11 A MWD
Job Ho. AKMW22005, Surveyed: 11 February, 2002
)
SURVEY REPORT
22 February, 2002
. Your Ref: API 500292278901
Surface Coordinates: 5979846.80 H, 721541.89 E (70020' 50.0070" H, 148012' 05.0297" W)
Kelly Bushing: 53. 85ft above Mean Sea Level
)
sp E!"""""" \/- SUI!
tJAILL.ING SERVICES
A Halliburton Company
Survey Ref: svy11114
Sperry-Sun Drilling Services 6)
Survey Report for NK-11A MWD
Your Ref: API 500292278901
Job No. AKMW22005, Surveyed: 11 February, 2002
BPXA
North Slope Alaska NIAKUK
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
15186.97 60.530 266.390 8092.49 8146.34 6312.34 N 7386.92 W 5985938.03 N 713971.61 E 8671.76 Tie On Point )
15266.00 60.990 267.910 8131.09 8184.94 6308.91 N 7455.79 W 5985932.57 N 713902.87 E 1.776 8737.86 Window Point
15334.48 59.730 269.140 8164.96 8218.81 6307.38 N 7515.29 W 5985929.27 N 713843.44 E 2.413 8795.30
15413.08 57.150 272.140 8206.10 8259.95 6308.10 N 7582.24 W 5985928.02 N 713776.49 E 4.620 8860.52
15474.57 56.910 269.720 8239.57 8293.42 6308.94 N 7633.82 W 5985927.33 N 713724.92 E 3.325 8910.83
15571.01 60.050 278.120 8290.05 8343.90 6314.65 N 7715.71 W 5985930.62 N 713642.90 E 8.104 8991.74
15667.89 63.680 280.770 8335.73 8389.58 6328.70 N 7799.95 W 5985942.17 N 713558.27 E 4.456 9076.91
15762.63 63.830 283.600 8377.63 8431.48 6346.64 N 7883.00 W 5985957.64 N 713474.73 E 2.684 9161.84
15857.57 62.230 287.000 8420.70 8474.55 6368.94 N 7964.60 W 5985977.53 N 713392.51 E 3.609 9246.41
15953.17 61.240 285.380 8465.97 8519.82 6392.42 N 8045.45 W 5985998.61 N 713310.99 E 1.817 9330.52
16048.50 62.170 283.190 8511.16 8565.01 6413.13 N 8126.79 W 5986016.90 N 713229.08 E 2.246 9414.45
16144.23 62.260 284.400 8555.79 8609.64 6433.32 N 8209.04 W 5986034.65 N 713146.27 E 1.122 9499.14
16240.51 62.940 284.670 8600.10 8653.95 6454.77 N 8291.78 W 5986053.65 N 713062.93 E 0.749 9584.61
16336.32 63.630 282.570 8643.17 8697.02 6474.92 N 8374.95 W 5986071.33 N 712979.20 E 2.086 9670.18
16432.52 63.930 283.330 8685.67 8739.52 6494.26 N 8459.06 W 5986088.18 N 712894.56 E 0.774 9756.48
16528.05 64.600 285.390 8727.16 8781.01 6515.61 N 8542.41 W 5986107.05 N 712810.61 E 2.065 9842.52
16623.46 64.020 284.620 8768.52 8822.37 6537.87 N 8625.46 W 5986126.84 N 712726.94 E 0.948 9928.47
16719.63 64.560 282.920 8810.24 8864.09 6558.49 N 8709.61 W 5986144.97 N 712642.21 E 1.689 10015.12
16815.46 63.730 282.170 8852.03 8905.88 6577.22 N 8793.79 W 5986161.20 N 712557.52 E 1.116 10101.34 )
16910.59 64.390 280.980 8893.65 8947.50 6594.38 N 8877.60 W 5986175.88 N 712473.25 E 1.322 10186.82
17007.25 64.400 280.320 8935.42 8989.27 6610.49 N 8963.26 W 5986189.45 N 712387.14 E 0.616 10273.86
17103.31 64.400 282.960 8976.93 9030.78 6627.97 N 9048.10 W 5986204.41 N 712301.82 E 2.4 78 10360.43
17198.51 65.010 284.500 9017.61 9071.46 6648.40 N 9131.71 W 5986222.36 N 712217.65 E 1.597 10446.50
17294.58 65.460 283.700 9057.85 9111.70 6669.65 N 9216.31 W 5986241.10 N 712132.45 E 0.889 10533.73
17390.20 65.980 283.250 9097.17 9151.02 6689.96 N 9301.08 W 5986258.90 N 712047.13 E 0.693 10620.89
17486.16 66.270 283.440 9136.01 9189.86 6710.21 N 9386.45 W 5986276.62 N 711961.19 E 0.352 10708.64
17517.58 66.440 282.590 9148.61 9202.46 6716.69 N 9414.50 W 5986282.27 N 711932.96 E 2.537 10737.42
17580.61 66.920 282.930 9173.57 9227.42 6729.48 N 9470.95 W 5986293.38 N 711876.16 E 0.908 10795.29
17676.22 67.800 283.030 9210.37 9264.22 6749.30 N 9556.93 W 5986310.65 N 711789.62 E 0.925 10883.52
17772.08 68.490 286.180 9246.06 9299.91 6771.74 N 9643.01 W 5986330.53 N 711702.92 E 3.134 10972.47
22 February, 2002 - 10:54
Page2of4
Drí/lQllest 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for NK-11A MWD
Your Ref: API 500292278901
Job No. AKMW22005, Surveyed: 11 February, 2002
North Slope Alaska
Measured Sub-Sea Vertical
Depth Incl. Azim. Depth Depth
(ft) (ft) (ft)
17817.45 68.840 283.510 9262.57 9316.42
17867.00 68.840 283.510 9280.46 9334.31
Local Coordinates
Northlngs Eastlngs
(ft) (ft)
6782.56 N
6793.36 N
9683.86 W
9728.79 W
Global Coordinates
Northlngs Eastlngs
(ft) (ft)
5986340.14 N
5986349.61 N
711661.77 E
711616.54 E
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Magnetic Declination at Surface is 26.746° (14-Jan-02)
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 283.700° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 17867.00ft.,
The Bottom Hole Displacement is 11865.88ft., in the Direction of 304.926° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
15186.97
15266.00
17867.00
8146.34
8184.94
9334.31
6312.34 N
6308.91 N
6793.36 N
7386.92 W
7455.79 W
9728.79 W
Tie On Point
Window Point
Projected Survey
22 February, 2002 - 10:54
Page 3 of 4
Dogleg
Rate
(o/100ft)
Vertical
Section
5.536 11014.72
0.000 11060.92
..
BPXA
NIAKUK
Comment
Projected Survey
)
)
DrillQllest 2.00.08.005
North Slope Alaska
Survey tool program for NK-11A MWD
',,-
From
Measured Vertical
Depth Depth
(ft) (ft)
0.00
10694.05
0.00
5753.69
22 February, 2002 - 10:54
To
Measured Vertical
Depth Depth
(ft) (ft)
10694.05
17867.00
Sperry-Sun Drilling Services
Survey Report for NK-11A MWD
Your Ref: API 500292278901
Job No. AKMW22005, Surveyed: 11 February, 2002
(I
BPXA
NIAKUK
Survey Tool Description
5753.69 AK-1 BP _HG (NK-11)
9334.31 MWD Magnetic (NK-11APB1 MWD)
Page4of4
Dril/Quest 2.00.08.005
)
)
'~
,,-., STATE OF ALASKA .~
ALASKA vlL AND GAS CONSERVATION COMMr¿SION
APPLICATION FOR SUNDRY APPROVAL
dM./"l
tJ1-\lO~?[;} \
tiTS J
2. / 2../ I D ;¿
1. Type of Request: 0 Abandon II Suspend IJ Plugging 0 Time Extension 0 Perforate
IJ Alter Casing 0 Repair Well 0 Pull Tubing 0 Variance 0 Other
IJ Change Approved Program 0 Operation Shutdown 0 Re-Enter Suspended Well 0 Stimulate
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
5. Type of well:
II Development
0 Exploratory
0 Stratigraphic
0 Service
6. Datum Elevation (OF or KB)
Plan RKB = 52.75'
7. Unit or Property Name
Niakuk
2. Name of Operator
BP Exploration (Alaska) Inc.
4. Location of well at surface
1312' NSL, 1021' WEL, SEC. 36, T12N, R15E, UM
At top of productive interval
2640' NSL, 4616' WEL, SEC. 26, T12N, R15E, UM (Planned Target)
At effective depth
8. Well Number
NK-11A
9. Permit Number
202-002 / 302-054
10. API Number
50-029-22789-01
11. Field and Pool
Niakuk Oil Pool
At total depth
2768' NSL, 5156' WEL, SEC. 26, T12N, R15E, UM (PlannedBHL)
12. Present well condition summary
Total depth: measured
true vertical
17867 feet
9334 feet
feet
feet
Plugs (measured)
true vertical
Effective depth: measured
Junk (measured)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
Size
Cemented
MD
TVD
80'
7995'
19983'
7348'
20"
13-3/8"
9-5/8"
7" x 5-1/2"
260 sx Arcticset I (Approx.)
2646 sx PF 'E', 1373 sx 'G', 50 sx PF 'c'
120'
8035'
10699' (TOW)
7610' - 14958'
120'
5020'
5759'
4890' - 8036'
750 sx Class 'G'
Liner stuck, Not cemented
Perforation depth: measured
None
RECEIVED
true vertical
None
Tubing (size, grade, and measured depth)
None
FE a 2 0 zoo(
Alaska Oil & Gas Coos. Comm,'ss'
Anchorage Ion
Packers and SSSV (type and measured depth) None
13. Attachments II Description Summary of Proposal
14. Estimated date for commencing operation
February 15, 2001
16. If proposal was verbally approved
Tom Maunder &~ ;)b~ 2/15/2002
Name of approver
Contact Engineer Name/Number:
0 Detailed Operations Program
15. Status of well classifications as:
0 Oil 0 Gas II Suspended
0 BOP Sketch
Service
17. I hereby certify that
Signed
Lowell Crane
Date Approved
ail/Isaacson, 564-5521 Prepared By Name/Number: Terrie Hubble, 564-4628
is true and correct to the best of my knowledge
Title Senior Drilling Engineer Date:;;> -;2 ú - ~:L
Conditions of ApprovaL: Notify Commission so representative may witness
- \. Plug integrity - BOP Test - Location clearance -
.' MP.C'.han¡""'lntegrityTest-Ðriginal St_!ftform required 10- L(O~
Approved by order of the Commis~ion Cammy Oechsli
Form 10-403 Rev. 06/15/88
I Approval No. 3CB- -074
Commissioner
Date
Submit In Triplicate
ORIGINAL
~
~
bp
To:
Tom Maunder - AOGCC
Date:
February 15, 2002
From:
William Isaacson - BPXA GPB Drilling & Wells
Subject:
Reference:
NK~11A Application for Sundry Approval -
P&A and Suspension of Operations
API # 50~029~22789~01
Dear Mr. Maunder,
As you are aware, Niakuk Well NK-11 A (Permit #202-002) was drilled to the permitted target location,
however was not completed due to a fault encountering at that location. The well penetrated the Kuparuk
reservoir and drilled approximately 325' of section before crossing the large Niakuk bounding fault and
ending up in the Lisburne formation. As per Sundry #302-054, the well (now called NK-11 APB1) was
plugged back and sidetracked to a Kuparuk target approximately 280' north of the initial Kuparuk
penetration. Operations to complete the well at this new location were commenced and a 7" x 5W'
tapered production liner was to be run and cemented. The liner was run into open hole without
complication until encountering an obstruction at approximately 14,958' MD. While attempting to work
past the obstruction, the liner running tool unexpectantly released leaving the liner approximately 2900'
high of the planned set depth. After pulling the running tool from the hole it was discovered that several
small pieces of the liner running tool were left downhole and that the liner top packer was potentially set.
A fishing assembly including a spear and pack-off were then run in attempt to continue to work the liner
downhole. This run confirmed that the liner top packer was set and that the liner was stuck atthis depth.
Forward plans are to plug back the well and suspend operations. The reserves found at this location and
the additional risks associated with the forward completion do not make this an economically attractive
project. The well will be left in a condition that allows the potential for future sidetrack opportunities.
Based upon information gathered from these two penetrations further reservoir evaluation is required to
properly select an alternative sidetrack location. Below is an outline of the proposed plug back and
suspension operations. Also enclosed is a schematic of the existing wellbore and proposed suspension
condition.
If you have any questions or require any additional information, please contact me at 564-5521.
Scope
Riq Operations:
1. RIH with 4-3/4" mill on 2-7/8" x 4" x 5" drillstring and drill out the 5-1/2" landing collar, float collar and
shoe. POH.
2. RIH to TD at 17,867' MD with 2-7/8" x 4" x 5" DP cement stinger. Circulate and condition well for
cementing operations. Spot a balanced 15.8 ppg cement P&A plug from TD to +/-16,500' MD (-500'
above the Top Kuparuk Reservoir). Cement volume planned is 108 bbls and is based upon an
equivalent hole diameter of 9.0" throughout this section. Pull above cement plug and circulate DP
clean. NOTE: Plans are to wac only 2 hrs before spotting the heavy mud spacer. This will
allow the cement to start an initial set and remain unaffected while spotting the spacer. The
plug will not be tagged as long as it is placed on bottom at 17,867', and no losses are seen
while spotting the plug or circulating on top of the plug.
3. Spot a 15.8 ppg heavy mud spacer from top of cement P&A plug at -16,500' MD to -14,800' MD. Pull
DP up to 15,150' MD and circulate out any excess heavy mud spacer above this point.
NK-11A Application for Sundry
,-\
.~
4. Spot a balanced 15.8 ppg cement P&A plug from 15,150' to -14,600' MD (-192' below 5W' casing
shoe and -358' up into 5W' casing). Cement volume planned is 29 bbls and is based upon an
equivalent hole diameter of 10.5" throughout the open hole section. Pull DP above cement plug and
wac. Pressure test cement plug and wellbore to 2500 psi. Displace wellbore to seawater above
cement plug and POH laying down DP.
5. Run a 4W' kill string to -2200' MD and land tubing hanger in wellhead.
6. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. Freeze protect the well to -2200'
MD. Set BPV and secure the well. Rig down and move off.
William Isaacson
BP Operations Drilling Engineer
Work: 564-5521
Cell: 240-8058
Home: 333-7546
NK-11A Application for Sundry
,~.
.~.
NK-11 A Proposed Suspension Condition
TREE: 4-1/16" - 5M CIW Carbon
WELLHEAD: 135/8" - 5M FMC Universal
Cellar Box Elevation = 19.1'
Doyon 14 AKB = 52.75'
Freeze Protect with Diesel down to +/-2200' MD
- 4-1/2" IBT-Mod Tubing to ~/-2200' I
13-3/8",68 #/ft, L-80, BTC
I 8035' I
..
II.
Sea Water
Þi
::!I.
,
- 7" x 9-5/8" Liner Top with Liner Top Packer Set
I 7,610' I
9-5/8",47 Hlft, L-80, BTC-M Casing extends down
to 20,021' MD. See 'Pre NK-11 Operations'
Schematic for details of remaining wellbore.
Planned Top Second P&A Plug 1+/-14,600' 1
Window Milled from Whipstock ..........
Top of Window at +1-10,699' MD ...........
Bridge Plug at +1-10,726' MD ----
Top of 17.0 ppg Cement P&Aplug
tagged at 16,812' MD
7" x 5-1/2" Tapered Liner
with 5-1/2" shoe at
1+/-14,958' I
- Planned Top Mud Spacer 1+/-15,150' I
Top Kuparuk Reservoir at 117,000' I
TD of 8-1/2" open hole 117,867' I
Date
Rev By
WSI
Comments
NIAKUK
WELL: NK-11A
API NO: 50-029-22789-01
02/15/02
Proposed Suspension Condition
GPB Drilling & Wells
Re: NK-11A Revised Plug & Suspension
~
-.
SUbject: Re: NK-11A Revised Plug & Suspension
Date: Wed, 20 Feb 200212:17:08 -0900
From: Tom Maunder <tom_maunder@admin.state.ak.us>
To: "Isaacson, William S" <lsaacsWS@BP.com>
Bill,
You seem to have been chosen for the the current run of not so good luck.
concur with the reasoning regarding setting the retainer above your prior
circulation point. Filling the casing below the retainer and placing additional
cement outside the shoe will comply with the plugging requirements. Hope you
find some good luck.
Tom Maunder, PE
AOGCC
"Isaacson, William S" wrote:
> Tom,
>
> As discussed, we need to revise the approved plug & suspension plan for the
> NK-11 A well. The bottom plug across the Kuparuk reservoir was successfully
> set on bottom as proposed and without complications. The heavy mud pill was
> then spotted up to the planned base of the second plug. The second plug was
> planned to extend from -200' below the 5-1/2" liner shoe, to -500' up into
> the 5-112" liner. The plug was successfully spotted and we waited on cement
> -12 hrs prior to pressure testing the plug. We attempted a pressure test to
> 2500 psi. The wellbore was pressured up to 2500 psi, at which point the
> pressure bled back down to 400 psi. Subsequent attempts to pressure up went
> to 590 psi, at which point the well started taking fluid at -1 bpm. We then
> ran in the hole looking to tag cement and went -20' below the shoe without
> encountering firm cement. When bottoms up reached surface we did see some
> heavy contaminated mud with a high ph.
>
> It looks as if we had a cement plug in place (not sure of how much), however
> it was not completely set-up and when we pressured up to 2500 psi we pushed
> it away. The thinking is that either the cement was not setting up and we
> pushed it away or it fell away after spotting it and the amount of cement
> that remained in the pipe was very small.
>
> Anyway, the plan forward is as below as we discussed. Also, as discussed we
> are planning to set the cement retainer -858' above the 5-1/2" shoe. This
> is because we want to stay above any potential cement stringers in the
> liner. When we placed the plug, we pulled up to 14, 188' and circulated the
> well clean above that point. By placing the retainer at 14,100' we will be
> above that circulation point.
>
> - POOH and pick-up a 5-1/2" cement retainer.
> - RIH with retainer and set at 14,100' MD (this is -858' above the 5-1/2"
> shoe).
> - Unsting and pressuer test wel/bore above retainer to 2500 psi.
> - Sting back into the retainer and establish injection rate.
> - Unsting and circulate cement down to within 30 bbls of end of drill pipe.
> Sting into retainer, using the annular preventer to control u-tube of cement
> as shut down to sting in. Inject 30 bbls of cement below retainer to fill
> 858' of 5-1/2" 17# liner and -100' of open hole at 10" equivalent diameter.
1 of2
2/21/021:42 PM
Re: NJ<..11A Revised Plug & Suspension
r"-
..~
> Unsling and dump -5 bbls on top of retainer.
> - Pick-up -300' above cement.
> - Test wellbore to 2500 psi for 30 minutes and displace the well to
> seawater.
> - POH laying down drill pipe.
> - Run kill string to -2200' MD and land tubing.
> - ND BOPE / NU and test tree. Freeze protect the well, set BPV and move
> off.
>
> Let me know if you have any questions. Thanks!!
>
> William S. Isaacson
> Alaska Drilling & Wells
> Phone: (907) 564-5521
> Fax: (907) 564-4040
> E-mail: IsaacsWS@BP.com
Tom Maunder <tom maunder@admin.state.ak.us>
Sr. Petroleum Engineer
Alaska Oil and Gas Conservation Commission
20f2
2/21/021:42 PM
Re: NK-11A Plugging & Suspension Operations
.
Sublect: Re: NK-11A Plugging & Suspension Operations
. "' Date: Fri, 15 Feb 200214:01:44 -0900
From: Tom Maunder <tom_maunder@admin.state.ak.us>
To: "Isaacson, William S" <lsaacsWS@BP.com>
.
Bill,
Thanks for the e file and fax. I have reviewed your proposal and it is as we discussed. Bad news on
liner
problems, but unfortunately they do happen. What you have proposed will be acceptable for the
suspension mode.
When future plans are decided for this well, please note that if the original window is not reused, it will
be
necessary to shoot holes and effect a squeeze through the window interval. A suicide squeeze might be
the best
method for that situation, but the ultimate decision will be yours. Depending on your timing, you may
wish to
consider doing that at this time. Good luck.
Tom Maunder, PE
AOGCC
"Isaacson, William 5" wrote:
> Tom,
>
> As discussed, enclosed is the plan forward on the NK-11A well. Thanks!!
>
> I'll also fax a copy as I mentioned.
>
> «NK-11A Sundry Application - Suspension II. ZIP> >
>
> William S. Isaacson
> Alaska Drilling & Wells
> Phone: (907) 564-5521
> Fax: (907) 564-4040
> E-mail: IsaacsWS@BP.com
>
> __...__._ .... ,-.._....... __- L " "" -... .._ __........ _ _ ......__...._______.....
> Name: NK-11A Sundry Application - Suspension II.ZIP
> NK-11A Sundry Application - Suspension II.ZIP Type: Zip Compressed Data
( application/x-zip-compressed)
>
Enco~ing: base64
Tom Maunder <tom maunder@admin.state.ak.us>
Sr. Petroleum Engineer
Alaska Oil and Gas Conservation Commission
1of2
2/21/02 1 :43 PM
':
/"- STATE OF ALASKA ~
ALASKA ~..... AND GAS CONSERVATION COMML_..>ION
APPLICATION FOR SUNDRY APPROVAL
~ h;;-¡<p
~ JfvÎH "-/0/(;2..
1. Type of Request: 0 Abandon
o Alter Casing
II Change Approved Program
2. Name of Operator
BP Exploration (Alaska) Inc.
o Suspend II Plugging 0 Time Extension 0 Perforate
o Repair Well 0 Pull Tubing 0 Variance II Other
o Operation Shutdown 0 Re-Enter Suspended Well 0 Stimulate PB & Change Btm Hole Location
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
5. Type of well:
1m Development
o Exploratory
o Stratigraphic
o Service
6. Datum Elevation (DF or KB)
Plan RKB = 52.75'
7. Unit or Property Name
Niakuk
4. Location of well at surface
1312' NSL, 1021' WEL, SEC. 36, T12N, R15E, UM
At top of productive interval
2640' NSL, 4616' WEL, SEC. 26, T12N, R15E, UM (New Planned Target)
At effective depth
8. Well Number
NK-11A
9. Permit Number
202-002
10. API Number
50- 029-22789-01
11. Field and Pool
Niakuk Oil Pool
At total depth
2768' NSL, 5156' WEL, SEC. 26, T12N, R15E, UM
12. Present well condition summary
Total depth: measured
(New Planned BHL)
true vertical
Effective depth: measured
true vertical
17535 feet
9169 feet
feet
feet
Plugs (measured)
Junk (measured)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
Size
Cemented
MD TVD
120' 120'
8035' 5020'
10699' (TOW) 5759'
80'
7995'
19983'
20"
13-3/8"
9-5/8"
260 sx Arcticset I (Approx.)
2646 sx PF 'E', 1373 sX 'G', 50 sx PF 'C'
750 sx Class 'G'
RECEIVED
Perforation depth: measured None
FEB 0 5 2002
true vertical None
Tubing (size, grade, and measured depth)
None
Alaska Oil & Gas Cons. Commission
And10rage
Packers and SSSV (type and measured depth) None
13. Attachments 1m Description Summary of Proposal
14. Estimated date for commencing operation
February 4, 2002
16. If proposal was verbally approvedJn N'\I\/1
Tom Maunder ?ði-"" ~ 2/4/2002
Name of approver Date Approved
Contact Engineer Name/Number: Bill Isaacson, 564-5521
17. I hereby certify that the fo going is true and correct to the best of my knowledge
Signed Lowell Crane Title Senior Drilling Engineer
o Detailed Operations Program
o BOP Sketch
15. Status of well classifications as:
~ Oil 0 Gas 0 Suspended
Service
Prepared By Name/Number: Terrie Hubble, 564-4628
Date .) -$"" - ò ;;L
Conditions of Approval: Notify Commission so representative mav...tness ~ ÞC:;" ß 't)y~"Ò\;- A roval No. Qr", '"\ -Oé I
Plug integrity _ BOP Test Location clea'ance _ pp ~ J "1
Mechanical Integrity Test _ Subsequent form required 10- \.\0'\ ~~ ~ \ \ ,-IS:>~? ~'to",
Original Signed By Commissioner
ammy R I GH~AL
,~
~
bp
To:
Tom Maunder - AOGCC
Date:
February 4, 2002
From:
William Isaacson - BPXA GPB Drilling & Wells
Subject:
Reference:
NK-11A Application for Sundry Approval -
Plug Back well for Sidetrack Operations
API # 50-029-22789-01
Dear Mr. Maunder,
As you are aware, Niakuk Well NK-11A (Permit #202-002) was drilled as planned to the proposed target,
however will not be completed due to encountering a fault at that location. The well penetrated the
Kuparuk reservoir and drilled approximately 325' of section before crossing the large Niakuk bounding
fault and ending up in the Lisburne formation. Plans are to plug back and sidetrack to a Kuparuk target
approximately 300' to the north of the current well path. Below is an outline of the proposed plug back and
sidetrack operations. Also enclosed is a schematic of the existing wellbore and proposed plug-back.
If you have any questions or require any additional information, please contact me at 564-5521.
Scope
Riq Operations: /
1. RIH to TD at 17,535' MD with 3-1/2" x 5" DP cement stinger. Circulate and condition well for
cementing operations. Spot a balanced 17.0 ppg cement P&A plug from TD to +/-16,505' MD (-500'
above the Top Kuparuk Reservoir). Pull above cement plug and circulate DP clean.
2. Spot a 17.0 ppg heavy mud spacer from top of cement P&A plug at -16,505' MD to -15,100' MD. Pull
DP up to 15,600' MD and circulate out any excess heavy mud spacer above this point. ./
3. Spot a 17.0 ppg cement kick-off plug from 15,600' to -15,200' MD. Pull DP up to -15,300' MD and
circulate out any excess cement above this point. Circulate and condition mud in hole. POOH.
4. PU 8-1/2" drilling assembly and RIH. Dress top of cement as required down to planned kick-off point
at -15,400' MD. Kick-off and drill the 8-1/2" hole section as per directional plan to TD @ :1:17,544' MD
(9228' TVD). POOH.
5. Run and cement a tapered 7" x 5W' production liner. POOH.
6. Test the 9-5/8" casing and 7" x 5W' liner from the landing collar to surface to 3500 psi for 30 minutes.
7. Make up 4-3/4" clean-out assembly with 7" casing scraper. Space out the bit and 7" scraper to run the
bit to the landing collar and scraper to within 30' of the 7" x 5W' crossover. Displace the well to clean
filtered brine and spot high-vis perf pill in liner. POOH.
8. PU and RIH with DPC perf guns. Tie-in w/ e-line & perf Kuparuk. POOH SB DP as allowed for next
well.
9. Run 4-1/2", 12.6# L-80 gas lift completion. Space-out tubing tail down into the 5-1/2" casing below the
7" x 5-1/2" crossover.
10. Set packer and test the tubing to 3500 psi and annulus to 3500 psi for 30 minutes.
11. Nipple down the BOPE. Nipple up and test the tree to 5000 psi.
12. Freeze protect the well to -100' below top GLM and secure the well. Rig down and move off.
Post-Riq Work:
1. Pull the ball and rod / RHC plug from below the production packer. Install gas lift valves.
N K-11 A Application for Sundry
~
~
NK-11 S..~tus - Pre NK-11A Opertlvi1S
TREE: 4-1/16' - 5M CIW Non-Chrome
WELLHEAD: 135/8" - SM Universal
Diesel
RT-GL = 40.7'
GL-SL= 19.1'
RT-BF = 39.5'
~
Freeze protect with diesel down to 2206' MD
13-3/8',68 #/11, L80,
I 8,035' I.
Sea Water
Tag top of 17.0 ppg cement plug at
1 16,812' I
Two Cement Plugs
I 17,460' I
Top of 60' section cut in 9-5/8" casing
Bridge Plug in 9-518" casingat 17,800' I
Base of 17.0 ppg cement plug
17,785' 1
TOp of window from Second 18,527' 1
Whipstock at
17.0 ppg Fresh Water Mud
in open hole between cement plugs
Top of window from First
Whipstock at
18,652' I
Nk-11PB3
95/8',47 #/11. L80, BTC-M I 20,021' I
Cement Plug 20.073' -19,500'
Tag Top Cement Plug at
I 22,861' I
21,302' - 20.052'
20,520' - 19.888'
Nk-11PB2
Kuparuk
1""-23,210'1
Nk-11PB1
8-1/2" Hole TD (Base Cement Plug)
I 23,885' 1
Date
02/04/02
Rev By
WSI
Comments
Niakuk
WELL: NK-11
API NO: 50-029-22789
Pre NK-11A Sidetrack Condition
Shared Services Drilling
~
,.--....
\
NK-11A Proposed Plug-Back
TREE: 4-1/16" - 5M CIW Carbon
WELLHEAD: 135/8" - 5M FMC Universal
Cellar Box Elevation = 19.1'
Doyon 14 RKB = 52.75'
13-3/8",68 lIft, L-80, BTC
18035' I
-
10.
Top of 17.0 ppg Cement P&A plug
tagged at 16,812' MD
Planned Top Kick-off Plug I +/-15,300' I
/
:Inned Top Mud Spacer I +/-15,600' I
Planned Top P&A Plug I +/-16,505' I
/ c" \'\ \\)() \ "'tL~~~
ToPKuparuk~tI17,005'1
Window Milled from Whipstock - ~
Top of Window at +1-10,699' MD ~
Bridge Plug set at +1-10,726' MD -
9-5/8",47 #/ft, L-80, BTC-M Casing extends down
to 20,021' MD. See 'Pre NK-11A Operations'
Schematic for details of remaining wellbore.
TD of 8-1/2" open hole at I 17,535'
Date
Rev By
WSI
Comments
NIAKUK
WELL: NK-11A
API NO: 50-029-22789-01
02/04/02
Proposed Plug-Back for Sidetrack Operations
GPB Drilling & Wells
~
r~
NK-11A Proposed Completion
TREE: 4-1/16" - 5M CIW Carbon
WELLHEAD: 135/8" - 5M FMC Universal
Cellar Box Elevation = 19.1'
Doyon 14 RKB = 52.75'
4-1/2" Halliburton 'Series 10' tubing retrievable SSSV.
I 2100' I
13-3/8",68 #/ft, L-80, BTC
18035' I
a
~
4-1/2" Gas Lift Mandrels with handling pups installed.
L
L
GAS LIFT MANDRELS
# TVD Size Valve Type
1 3900' 4-1/2" x 1-1/2" DV
2 5350' 4-1/2" x 1-1/2" DV
3 5400' 4-1/2" x 1-1/2" DV
4 6550' 4-1/2" x 1" RP Shear
5 7500' 4-1/2" x 1" DV
6 8250' 4-1/2" x 1" DV
L.
- 4-1/2" 12.6# L-BO, IBT Tubing
9-5/B", 47 Hlft, L-BO, BTC-M Casing extends down
to 20,021' MD. See' Pre NK-11A Operations'
Schematic for details of remaining wellbore.
4-1/2" 'X' Landing Nipple with 3.813" seal bore.
7" x 4-1/2" Baker 'S-3' Production Packer
4-1/2" 'X' Landing Nipple with 3.813" seal bore.
4-112" 'XN' Landing Nipple with 3.813" seal bore and 3.725" No-Go ID.
4-112" Flush Wireline Entry Guide pup spaced-out into 5-112" casing.
Þ4
::S.
1+/-10,550' I BAKER 7" x 9-5/8" Liner Tie Back Sleeve
ZXP Liner Top Packer
'Flex Lock' Hydraulic Liner Hanger
Window Milled from Whipstock
Top of Window at 10,699' MD
Top of 17.0 ppg Cement P&A plug
tagged at 16,812' MD
7" x 5-1/2" crossover I +/-16,000' I
Plug Back Depth I +/-17,460' I
7", 29 #It!, L-BO, NSCC & Hydril 511/563 I
tapered to +/-17,544' I
5-1/2" 17 #It!, L-BO Hydril 521
Date
Rev By
Comments
NIAKUK
WELL: NK-11A
API NO: 50-029-22789-01
02/04/02
WSI
Proposed Completion
GPB Drilling & Wells
sperara.'d-. sun.. .1 North Slope Alaska
!:l.fiLI...b.tNG S&AVlceS BPXA
Á H.,..."", """'P..y
7500 -
Current Well Properties
:::::-
ã)
~
(/)
C>
c:
.--=
.co
1::0
0<0
Z II
.c:
()
.!:
6900 -
Well:
Horizontal Coordinates:
Ref. Global Coordinates:
Ref. Structure:
Ref. Geographical Coordinates:
RKB Elevation:
NK-11A
5979846.80 N, 721541.89 E
5647.48 S, 5399.02 E
70° 20' 50.0070" N, 1480 12' 05.0297" W
North Reference:
Units:
53.85ft above Mean Sea Level
53. 85ft above Structure
True North
Feet (US)
ëD
ro 6300-
()
Cf)
~Q
lot
Ib'
&'
~o¿
#'
..~
".y-
.'"
~. NK.IiA Tli<'pKllp,""k
Q"' S99S.S5ri TVlJ
~lif!" 61,./1..56"'/89>;0.4'1 II'
7" Casing
17544.36ft MD
9228.85ft TVD
I DrillQuest
f:> -
¡;
I-f'f
4}i
~Q ,f"
ro~ <!.~
~~ ~.
J' $'
~" ~"
.f~
9,'9' 'bro'
~ JNo
.'. <!.<!.'
;:: ~~
...')1 <S'
...- ...
~I/Þ I/Þ
.." ~
~ç .,.f
*" ,,:.
~":J ,§'
ø r-.q'
500,./ """,
.¡~..._......... jmao....._......_J1""c............__....;""'£.'
NIAKUK
NK-11A open hole WPO3
~Q ~Q
~~ .;;.~
",'b -~.
., 4:'-
~ ~"
~ ~~
...If- ,,"
~~ ~~.
. ...'f>
"è' .I'
~. .~
j-@ ..,f
.,.f ~@
~ ., #'" if
~100.00' .¿'I' jlj
""-IIJ\IV~
(OPen hoìeJ
I
-9600
Scale: 1 inch = 600ft
I
-9000
I
-8400
Eastings (Well)
I
-7800
Single Well Target Data for NK-11A open hole WPO3
Measurement Units: 11
Coordinate
Target Point TVD Northings
Name Type
NK-llA Tl top Kuparuk Entry Point 8998.85 6641.56 N
8100 -
ST point: Start Dlr @ 4.000'/10011, 86.00' TF : 15400.0OftMD,8250.301tTVD
/
""",.,
:::::-
ã3
~
.c
-
a.
CD -= 8700 -
08
- <0
~ II
.- .c:
1::()
CDc
>:,::
()
ãi
~ 9300-
Jv>t.ll-4 ""'" ~m""
I.oÞoJ"",
(°Þen """",
------------ J,O/e)_-
Eastings
SSTVD
8980.49 W
8945.00
~~~~;~~~i~:?din :
Measurerrent Units :
North Reference:
Northings
ASPY
5986220.00 N
Eastings
ASP X
712369.00 E
)
I
-7200
Reference is True North
Target
Shape
Point
Proposal Data for NK-11A WPO3 (open hole)
We.
We.
It
T,ue North
Measured ncl. Allm. Vertical
Depth Depth
154(J0.()() 60.817 267.421 8'<-0.30
15822.10 63.247 286.3W 8449.66
16965.74 63.247 286.360 8964.47
17041.49 62.782 283.IXXJ 8998.85
17544.36 62.782 283.000 9228.85
End OJ,, Start Sail @ 63.247': 15822.1OftMD,8449.66I1TVD Doglegseverily: Degrees per 100leet(US)
Vertical Section A21mu1h : 283.700'
~ - - - - - - - - - - - - - - - - - --r;;;¡"-:,,,:i'4585f¡ n1õ ~:~:~~: ~:~::~~ g~i~f~i~tiOn: ~~~ N ,0.00 E
Begin Dir @ 4.000'/100It: 16965.74/1 MD, 8964.4711 TVD--_- ~oo- - - - - - - - - - - iifiZ-:"frJ'!uJ"'! )V()
--- '"
----------------~-
End Dir, Start Sail @ 62.7820 : 17041.49ftMD,8998.85I1TVD
,VK.¡¡,1 'r¡ "'1' kufJwuk'"
WY8.S'fi TH)
664/.,6 N, bY.Y¡J..IY n'
T' Casing
17544.36ft MD
9228.85ft TVD
- - - - - - - - - - - - - - - - - - - - - --:::::-="~ x"""",i(zÖ:,,, ,e {tI.'i.P22ij.8W IVl.'
Total Depth: 17544.36ftMD.9228.85I1TVD -- .
I I I I I I
8400 9000 9600 10200 10800 11400
Scale: 1 inch = 600ft Section Azimuth: 283.7000 (True North)
Vertical Section (Well)
~..,,~....."MMM"
Northings
6291.68 N
6336.80 N
6624.45 N
6641.56 N
6742.16 N
)
Eastinga
Vertical
Section
8842.57
9210.37
10230.48
10297.96
10745.12
Dogleg
Rate
7567.77W
7935.34 W
8915.20 W
8980.49 W
9416.22 W
4.000
0.000
4.000
0.000
)
1aska
rIng & Wells
'at NK-11A Rig Reca
a - NK-11A WPO3 (open hole)
Revised: 4 February, 2002
PROPOSAL REPORT
5 February, 2002
)
Surface Coordinates: 5979846.80 N, 721541.89 E (70.20' 50.0070" N, 148012' 05.0297" W)
Surface Coordinates relative to Project H Reference: 979846.80 N, 221541.89 E (Grid)
Surface Coordinates relative to Structure: 5647.48 S, 5399.02 E (True)
Kelly Bushing: 53. 85ft above Mean Sea Level
Sps í"í"V - SUi!
DRIL..L.ING SERVICES
A Halliburton Company
Proposal Ref: pr011090
Sperry-Sun Drilling Services
Proposal Report for NK-11A Reca
Revised: 4 February, 2002
Alaska Drilling & Wells
North Slope Alaska NIAKUK
Measured Sub-Sea Vertical Local Coordinates ogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings ate Section Comment
(ft) (ft) (ft) (ft) (ft) OOft)
NK-11 Reca
"'OPec
0.00 0.000 0.000 -53.85 0.00 721541.89 E 0.00 )
100.00 0.077 31 .201 46.15 100.00 721541.91 E 0.077 -0.01
200.00 0.051 79.610 146.15 200.00 721541.99 E 0.058 -0.08
300.00 0.116 30.535 246.15 300.00 721542.08 E 0.091 -0.14
400.00 0.093 90.011 346.15 400.00 721542.21 E 0.105 ..Q.25
500.00 0.161 115.402 446.15 5979847.04 N 721542.42 E 0.087 -0.47
600.00 0.182 122.555 546.15 5979846.90 N 721542.69 E 0.030 -0.76
700.00 0.098 87.478 646.15 5979846.83 N 721542.91 E 0.117 -0.99
800.00 0.069 97.557 746.15 5979846.83 N 721543.05 E 0.032 -1.13
900.00 0.210 88.619 846.15 5979846.83 N 721543.30 E 0.143 -1.37
1000.00 0.220 76.567 0.04N 1.78 E 5979846.89 N 721543.67 E 0.046 -1.72
1100.00 0.228 72.285 0.14 N 2.16 E 5979847.01 N 721544.04 E 0.018 -2.06
1200.00 0.192 64.240 0.28 N 2.49 E 5979847.15 N 721544.37 E 0.046 -2.36
1300.00 0.226 63.150 0.44 N 2.83 E 5979847.32 N 721544.70 E 0.034 -2.64
1400.00 0.158 59.316 0.60N 3.12 E 5979847.49 N 721544.99 E 0.069 -2.89
1500.00 0.097 61.821 1446.14 1499.99 0.71 N 3.31 E 5979847.61 N 721545.18 E 0.060 -3.05
1600.00 0.071 27.591 1546.14 1599.99 0.80N 3.41 E 5979847.71 N 721545.27 E 0.056 -3.12
1700.00 0.108 58.465 1646.14 1699.99 0.90 N 3.53 E 5979847.80 N 721545.39 E 0.059 -3.21
1800.00 0.271 349.613 1746.14 1799.99 1.16 N 3.56 E 5979848.06 N 721545.41 E 0.253 -3.18 )
1900.00 1.030 355.727 1846.14 1899.99 2.24N 3.48 E 5979849.14 N 721545.30 E 0.761 -2.85
2000.00 2.688 346.408 1946.08 1999.93 5.46 N 2.87 E 5979852.35 N 721544.59 E 1.680 -1.49
2100.00 3.550 337.487 2045.93 2099.78 10.59 N 1.14 E 5979857.42 N 721542.72 E 0.987 1.40
2200.00 4.857 330.231 2145.66 2199.51 17.09 N 2.15W 5979863.81 N 721539.23 E 1 .408 6.14
2300.00 6.830 331.325 2245.14 2298.99 25.97 N 7.12W 5979872.55 N 721534.00 E 1.976 13.07
2400.00 8.854 333.356 2344.20 2398.05 38.08 N 13.39 W 5979884.47 N 721527.38 E 2.043 22.02
2500.00 10.955 329.680 2442.70 2496.55 53.16 N 21.68 W 5979899.30 N 721518.65 E 2.193 33.65
2600.00 12.819 330.481 2540.57 2594.42 70.97 N 31.87 W 5979916.80 N 721507.93 E 1.871 47.77
2700.00 16.142 328.552 2637.37 2691.22 92.49 N 44.64 W 5979937.93 N 721494.54 E 3.358 65.27
2800.00 18.776 329.394 2732.73 2786.58 118.29 N 60.14 W 5979963.26 N 721478.28 E 2.645 86.44
2900.00 21 .517 329.779 2826.66 2880.51 147.90 N 77.41 W 5979992.34 N 721460.14 E 2.745 110.24
...-
5 February, 2002 - 8:54 Page 2 of 10 DrillQuest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for NK-11A Reca
Revised: 4 February, 2002
Alaska Drilling & Wells
North Slope Alaska NIAKUK
Measured Sub-Sea Vertical Local Coordinates Global Coordinates ogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastin ate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) GOft)
3000.00 24.453 329.172 2918.71 2972.56 181.55 N 2.946 137.44
3100.00 27.878 327.989 3008.44 3062.29 219.18N 3.464 168.73
3200.00 30.509 328.302 3095.75 3149.60 260.53 N 2.636 203.55
3300.00 33.824 328.740 3180.54 3234.39 305.73 N 3.324 241.13 )
3400.00 37.003 329.862 3262.05 3315.90 355.52 N 3.244 281.66
3500.00 40.216 330.416 3340.21 3394.06 0249.31 N 721295.63 E 3.231 324.60
3600.00 43.545 330.716 3414.63 3468.48 5980306.47 N 721261.10E 3.335 370.27
3700.00 46.624 330.876 3485.13 3538.98 5980367.32 N 721224.71 E 3.081 418.52
3800.00 49.389 330.807 3551.97 3605.82 5980431.21 N 721186.65 E 2.766 469.03
3900.00 51.781 330.565 3615.56 3669.41 5980497.35 N 721146.90 E 2.399 521.67
4000.00 54.049 330.435 414.84 W 5980565.58 N 721105.62 E 2.270 576.25
4100.00 56.977 329.993 455.72 W 5980635.78 N 721062.63 E 2.950 632.89
4200.00 59.913 329.827 498.59 W 5980708.26 N 721017.61 E 2.940 692.01
4300.00 63.201 330.030 542.68 W 5980783.13 N 720971 .28 E 3.293 752.90
4400.00 64.876 330.257 587.50W 5980859.81 N 720924.18 E 1.687 814.92
4500.00 65.679 330.274 1109.57 N 632.38 W 5980937.19 N 720876.99 E 0.803 877.18
4600.00 67.175 330.496 1189.21 N 677.72 W 5981015.46 N 720829.32 E 1.509 940.09
4700.00 69.390 330.672 1270.19 N 723.34 W 5981095.05 N 720781.32 E 2.221 1003.59
4800.00 70.304 330.976 1352.28 N 769.21 W 5981175.75 N 720733.04 E 0.957 1067.60
4900.00 70.933 331.238 1434.90 N 814.81 W 5981256.98 N 720685.02 E 0.676 1131.47
5000.00 71 .580 331.485 4094.22 4148.07 1517.99 N 860.17 W 5981338.70 N 720637.23 E 0.689 1195.21 )
5100.00 72.626 331.584 4125.19 4179.04 1601.60 N 905.44 W 5981420.94 N 720589.50 E 1.050 1259.00
5200.00 73.322 331.459 4154.36 4208.21 1685.76 N 950.91 W 5981503.71 N 720541.57 E 0.706 1323.11
5300.00 72.882 330.016 4183.42 4237.27 1769.22 N 997.69 W 5981585.76 N 720492.34 E 1.449 1388.32
5400.00 73.244 330.085 4212.30 4266.15 1852.16N 1045.52 W 5981667.24 N 720442.08 E 0.368 1454.43
5500.00 73.280 330.138 4241.14 4294.99 1935.15N 1093.28 W 5981748.78 N 720391.89 E 0.062 1520.49
5600.00 73.644 330.277 4269.78 4323.63 2018.32 N 1140.84W 5981830.52 N 720341.89 E 0.387 1586.39
5700.00 73.907 330.435 4297.78 4351.63 2101.78 N 1188.27 W 5981912.54 N 720292.01 E 0.304 1652.25
5800.00 73.486 330.172 4325.75 4379.60 2185.18 N 1235.84 W 5981994.49 N 720242.00 E 0.491 1718.21
5900.00 71 .892 330.370 4355.52 4409.37 2268.05 N 1283.22 W 5982075.93 N 720192.18 E 1.605 1783.87
5 February, 2002 - 8:54
Page 3 of 10
DriflQuest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for NK.11A Reca
Revised: 4 February, 2002
Alaska Drilling & Wells
North Slope Alaska NIAKUK
Measured Sub-Sea Vertical Local Coordinates Global Coordinates ogles Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Easti ate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) OOft)
6000.00 72.911 330.361 4385.71 4439.56 2350.91 N 1.020 1849.30
6100.00 72.998 330.522 4415.23 4469.08 2434.02 N 0.177 1914.77
6200.00 73.596 330.764 4443.92 4497.77 2517.51 N 0.641 1980.18
6300.00 73.124 330.845 4472.69 4526.54 2601.11 N 0.479 2045.37 ')
6400.00 73.738 330.937 4500.98 4554.83 2684.91 N 0.621 2110.56
6500.00 73.301 330.997 4529.15 4583.00 2568.16 N 719896.33 E 0.441 2175.65
6600.00 73.956 331.106 4557.67 4611.52 5982650.62 N 719847.49 E 0.664 2240.58
6700.00 74.443 331.022 4584.90 4638.75 5982733.43 N 719798.47 E 0.493 2305.75
6800.00 74.269 330.966 4611.87 4665.72 5982816.21 N 719749.28 E 0.182 2371.08
6900.00 74.308 331.095 4638.74 4692.59 5982899.06 N 719700.15 E 0.130 2436.37
7000.00 74.537 331.085 1797.25 W 5982981.98 N 719651.14 E 0.229 2501.56
7100.00 74.721 330.953 1843.96 W 5983064.93 N 719601.96 E 0.224 2566.92
7200.00 74.964 330.822 1890.92 W 5983147.73 N 719552.53 E 0.275 2632.49
7300.00 75.241 330.925 1938.07W 5983230.73 N 719502.90 E 0.294 2698.29
7400.00 73.533 331.327 1984.53 W 5983313.60 N 719453.97 E 1.751 2763.40
7500.00 71 .808 331.585 3610.91 N 2030.16W 5983396.12 N 719405.88 E 1.743 2827.60
7600.00 71.363 331.637 3694.35 N 2075.25 W 5983478.20 N 719358.34 E 0.448 2891.17
7700.00 72.063 331.653 3777.83 N 2120.27 W 5983560.31 N 719310.88 E 0.700 2954.68
7800.00 72.451 331.750 3861.69 N 2165.36 W 5983642.80 N 719263.32 E 0.399 3018.35
7900.00 73.039 331.562 3945.80 N 2210.72 W 5983725.53 N 719215.50 E 0.614 3082.34
8000.00 74.190 331.631 4952.28 5006.13 4030.18 N 2256.44 W 5983808.52 N 719167.31 E 1.153 3146.74 )
8100.00 74.000 331.623 4979.85 5033.70 4114.77N 2302.10 W 5983891.72 N 719119.17 E 0.190 3211.14
8200.00 74.245 331.389 5007.41 5061.26 4199.24 N 2347.97 W 5983974.80 N 719070.82 E 0.333 3275.71
8300.00 73.579 330.840 5034.90 5088.75 4283.47 N 2394.34 W 5984057.62 N 719021 .98 E 0.850 3340.71
8400.00 73.788 329.422 5062.77 5116.62 4366.78 N 2442.11 W 5984139.49 N 718971 .77 E 1.377 3406.85
8500.00 73.469 328.654 5091.02 5144.87 4449.01 N 2491.51 W 5984220.21 N 718919.96 E 0.803 3474.32
8600.00 73.174 327.217 5119.81 5173.66 4530.18 N 2542.32 W 5984299.85 N 718866.77 E 1.408 3542.91
8700.00 72.865 326.014 5148.92 5202.77 4610.15N 2594.83 W 5984378.23 N 718811.92 E 1.191 3612.87
8800.00 73.093 325.252 5177.94 5231.79 4689.19 N 2648.77W 5984455.65 N 718755.67 E 0.764 3683.99
8900.00 73.187 323.847 5207.06 5260.91 4766.92 N 2704.54 W 5984531.69 N 718697.63 E 1.348 3756.58
5 February, 2002 - 8:54
Page 4 of 10
DrillQuest 2.00.09.006
Sperry-Sun Drilling Services
ProposalReportforNK-11A Reca
Revised: 4 February, 2002
Alaska Drilling & Wells
North Slope Alaska NIAKUK
Measured Sub-Sea Vertical Local Coordinates Global Coordinates ogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Easti ate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) Daft)
9000.00 73.173 323.549 5236.17 5290.02 4844.00 N 0.286 3829.89
9100.00 73.026 323.391 5265.36 5319.21 4920.85 N 0.211 3903.41
9200.00 72.115 323.300 5295.59 5349.44 4997.35 N 0.916 3976.78 ')
9300.00 72.502 323.259 5325.88 5379.73 5073.72 N 0.390 4050.25
9400.00 72.362 323.313 5356.31 5410.16 5149.99 N 0.150 4123.76
9500.00 72.615 323.574 5386.21 5440.06 4981.15N 718342.83 E 0,355 4197.11
9600.00 73.487 323.521 5415.96 5469.81 5985056.26 N 718283.90 E 0.873 4270.37
9700.00 74.047 323.699 5444.09 5497.94 5985131.68 N 718224.57 E 0.586 4344.10
9800.00 74.370 323.756 5471.00 5524.85 5985207.67 N 718165.40 E 0.327 4417.78
9900.00 74.989 323.498 5497.06 5550.91 5985283.68 N 718105.87 E 0.667 4491.81
10000.00 75.514 323.315 3331.48 W 5985359.61 N 718045.93 E 0.554 4566,24
10100.00 75.775 323.195 3389.40 W 5985435.36 N 717985.74 E 0.286 4640.87
10200.00 75.396 323.081 3447.48 W 5985511.08 N 717925.40 E 0.395 4715.64
10300.00 75.065 323.162 3505.55 W 5985586.72 N 717865.06 E 0.340 4790.40
10400.00 75.101 323.067 3563.61 W 5985662.30 N 717804.74 E 0.098 4865.12
10500.00 75.150 323.092 6000.74 N 3621.65 W 5985737.86 N 717744.44 E 0.055 4939.81
10600.00 74.945 322.976 6077.85 N 3679.71 W 5985813.22 N 717684.13 E 0.233 5014.48
10644.05 74.760 323.020 6111.81 N 3705.30 W 5985846.41 N 717657.55 E 0.431 5047.39 Tie-On Survey
10699.00 74.654 323.146 6154.18N 3737.12W 5985887.82 N 717624.48 E 0.294 5088.35 Top of Window
NK-11A PB1 Rig MWD )
10700.00 74.610 323.070 5701.42 5755.27 6154.95 N 3737.70 W 5985888.58 N 717623.88 E 8.549 5089.09
10800.00 69.686 315.273 5731.83 5785.68 6227.00 N 3799.86 W 5985958.76 N 717559.62 E 8.903 5166.54
10900.00 67.733 309.675 5768.72 5822.57 6289.16 N 3868.91 W 5986018.85 N 717488.76 E 5.569 5248.35
11000.00 66.346 305.144 5807.99 5861.84 6345.20 N 3941.81 W 5986072.71 N 717414.24 E 4.397 5332.45
11100.00 63.630 300.878 5850.03 5903.88 6394.67 N 4017.84 W 5986119.91 N 717336.79 E 4.723 5418.03
11200.00 60.553 296.795 5896.92 5950.77 6437.47 N 4095.07 W 5986160.41 N 717258.32 E 4.741 5503.20
11300.00 57.479 292.763 5948.50 6002.35 6474.41 N 4172.33 W 5986195.05 N 717180.00 E 4.625 5587.01
11400.00 56.767 286.034 6002.88 6056.73 6502.07 N 4251.52 W 5986220.35 N 717100.03 E 5.695 5670.50
11500.00 55.903 276.139 6058.33 6112.18 6517.77 N 4333.11 W 5986233.63 N 717018.01 E 8.277 5753.49
11600.00 53.428 270.651 6115.73 6169.58 6521.83 N 4414.85 W 5986235.28 N 716936.18 E 5.115 5833.86
5 February, 2002 - 8:54
Page 5 of 10
DrillQuest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for NK-11 AReca
Revised: 4 February, 2002
Alaska Drilling & Wells
North Slope Alaska NIAKUK
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastin Section Comment
(ft) (ft) (ft) (ft) (ft) (ft)
11659.30 51 .393 268.061 6152.00 6205.85 6521.36 N 4.874 5879.32 WS2
11700.00 51 .424 267.208 6177.44 6231.29 6519.87 N 1.639 5909.80
11800.00 52.592 265.152 6239.02 6292.87 6514.81 N 1.997 5984.99
11900.00 50.291 266.046 6301.23 6355.08 6508.69 N 2.405 6059.36 )
12000.00 49.755 266.142 6365.54 6419.39 6503.37 N 0.540 6132.31
12100.00 49.259 265.772 6430.46 6484.31 6200.12 N 716549.49 E 0.571 6204.79
12200.00 49.313 266.545 6495.77 6549.62 5986192.64 N 716474.12 E 0.588 6276.95
12300.00 49.393 267.288 6560.90 6614.75 5986186.35 N 716398.50 E 0.569 6349.61
12400.00 49.017 267.192 6626.20 6680.05 5986180.53 N 716322.99 E 0.383 6422.25
12500.00 49.323 266.955 6691.61 6745.46 5986174.44 N 716247.60 E 0.354 6494.73
12600.00 50.518 266.805 5181.33 W 5986168.03 N 716171.36 E 1.201 6567.97
12677.67 51.268 265.885 5241.47 W 5986162.41 N 716111.35 E 1.333 6625.49 WS1
12700.00 51 .509 265.671 5258.87W 5986160.61 N 716094.00 E 1.314 6642.09
12800.00 52.851 265.345 5337.65 W 5986152.10 N 716015.44 E 1.367 6717.16
12900.00 53.624 265.148 5417.48 W 5986143.01 N 715935.84 E 0.789 6793.13
13000.00 54.193 265.544 6452.79 N 5498.09 W 5986134.25 N 715855.46 E 0.653 6869.93
13100.00 54.273 265.179 6445.87 N 5578.91 W 5986124.94 N 715774.88 E 0.306 6946.81
13200.00 54.520 266.570 6440.31 N 5660.04 W 5986116.99 N 715693.95 E 1.158 7024.32
13300.00 55.551 265.155 6435.03 N 5741.50 W 5986109.30 N 715612.68 E 1.552 7102.21
13400.00 58.910 262.398 6425.27 N 5824.94 W 5986097.08 N 715529.57 E 4.081 7180.96
13500.00 61 .244 262.264 7276.78 7330.63 6413.60 N 5911.17W 5986082.86 N 715443.72 E 2.337 7261.98 )
13569.17 61 .310 262.200 7310.00 7363.85 6405.45 N 5971 .29 W 5986072.94 N 715383.86 E 0.126 7318.46 CM-3
13600.00 61 .233 261.939 7324.82 7378.67 6401.72 N 5998.07 W 5986068.42 N 715357.21 E 0.784 7343.59
13700.00 60.849 261.739 7373.18 7427.03 6389.03 N 6084.67 W 5986053.17 N 715271.02 E 0.422 7424.72
13800.00 60.500 261.988 7422.23 7476.08 6376.81 N 6170.96 W 5986038.41 N 715185.13 E 0.411 7505.66
13900.00 60.997 263.001 7471.32 7525.17 6365.07 N 6257.28 W 5986024.13 N 715099.19 E 1.014 7586.75
14000.00 61.174 264.371 7519.40 7573.25 6355.58 N 6344.45 W 5986012.06 N 715012.35 E 1.212 7669.19
14100.00 60.883 264.858 7567.87 7621.72 6347.53 N 6431.54 W 5986001.44 N 714925.53 E 0.516 7751.90
14200.00 60.858 264.751 7616.60 7670.45 6339.69 N 6518.51 W 5985991.03 N 714838.82 E 0.096 7834.54
14300.00 61 .336 265.574 7665.02 7718.87 6332.07 N 6605.67 W 5985980.84 N 714751.93 E 0.864 7917.41
5 February, 2002 - 8:54
Page 6 of 10
DriflQuest 2.00.09.006
Sperry-Sun Drilling Services 1
Proposal Report for NK-11A Reca
Revised: 4 February, 2002
Alaska Drilling & Wells
North Slope Alaska NIAKUK
Measured Sub-Sea Vertical Local Coordinates Global Coordinates ogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastin ate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) OOft)
14400.00 60.932 265.318 7713.09 7766.94 6325.41 N 0.462 8000.79
14500.00 61 .448 267.268 7761.50 7815.35 6319.30 N 1.785 8084.14
14600.00 60.589 267.622 7809.71 7863.56 6315.72 N 0.913 8168.33
14700.00 61 .639 267.112 7858.25 7912.10 6311.73 N 1.141 8252.24 )
14800.00 60.953 268.426 7906.13 7959.98 6308.18 N 1.341 8336.62
14900.00 61.157 268.718 7954.57 8008.42 5939.32 N 714228.16 E 0.326 8421.08
15000.00 61.836 268.412 8002.26 8056.11 5985934.53 N 714140.40 E 0.730 8505.93
15100.00 61.089 267.709 8050.04 8103.89 5985928.84 N 714052.74 E 0.970 8590.49
15200.00 60.606 268.744 8098.86 8152.71 5985923.79 N 713965.61 E 1.025 8674.66
15300.00 60.989 267.646 8147.52 8201.37 5985918.35 N 713878.42 E 1.032 8758.81
15400.00 60.817 267.421 8196.45 7567.77W 5985912.03 N 713791.44 E 0.262 8842.57 ST point: Start Dir @ 4.000°/1000,
86.00° TF :
15400.00ftMD,8250.3OOTVD
NK-11A WP03 (open hole)
15500.00 61.153 271.979 6291.23 N 7655.19 W 5985909.00 N 713704.08 E 4.000 8927.39
15600.00 61 .642 276.501 6297.73 N 7742.71 W 5985912.90 N 713616.41 E 4.000 9013.96
15700.00 62.278 280.976 6311.14 N 7829.91 W 5985923.73 N 713528.84 E 4.000 9101.86
15800.00 63.056 285.393 6331.41 N 7916.37 W 5985941.43 N 713441.82 E 4.000 9190.66
15815.85 63.192 286.087 6335.24 N 7929.98 W 5985944.87 N 713428.11 E 4.000 9204.79 Tuffs
15822.10 63.247 286.360 8395.81 8449.66 6336.80 N 7935.34 W 5985946.27 N 713422.70 E 4.000 9210.37 End Dir, Start Sail @ 63.247°: )
15822.10ftMD,8449.66ftTVD
15900.00 63.247 286.360 8430.88 8484.73 6356.39 N 8002.08 W 5985963.88 N 713355.41 E 0.000 9279.85
16000.00 63.247 286.360 8475.89 8529.74 6381.55 N 8087.76 W 5985986.49 N 713269.03 E 0.000 9369.05
16100.00 63.247 286.360 8520.91 8574.76 6406.70 N 8173.44 W 5986009.10 N 713182.64 E 0.000 9458.25
16200.00 63.247 286.360 8565.92 8619.77 6431.85 N 8259.12 W 5986031.70 N 713096.25 E 0.000 9547.45
16300.00 63.247 286.360 8610.94 8664.79 6457.01 N 8344.80 W 5986054.31 N 713009.87 E 0.000 9636.65
16400.00 63.247 286.360 8655.95 8709.80 6482.16 N 8430.48 W 5986076.92 N 712923.48 E 0.000 9725.85
16500.00 63.247 286.360 8700.97 8754.82 6507.31 N 8516.16 W 5986099.53 N 712837.10 E 0.000 9815.05
16600.00 63.247 286.360 8745.98 8799.83 6532.46 N 8601.84 W 5986122.14 N 712750.71 E 0.000 9904.25
16648.91 63.247 286.360 8768.00 8821.85 6544.76 N 8643.75 W 5986133.20 N 712708.46 E 0.000 9947.87 HRZ
5 February, 2002 - 8:54
Page 7 of 10
DrillQuest 2.00.09.006
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings
(ft) (ft) (ft) (ft) (ft)
16700.00 63.247 286.360 8791.00 8844.85 6557.62 N
16800.00 63.247 286.360 8836.01 8889.86 6582.77 N
16900.00 63.247 286.360 8881.03 8934.88 6607.92 N
16919.94 63.247 286.360 8890.00 8943.85 6612.94 N
16965.74 63.247 286.360 8910.62 8964.47 6624.45 N
17000.00 63.027 284.844 8926.10 8979.95
17041.49 62.782 283.000 8945.00 8998.85
Sperry-Sun Drilling Services
Proposal Report for NK.11A Reca
Revised: 4 February, 2002
Global Coordinates
Northings Eastin
(ft)
712405.10 E
712369.00 E
17100.00 62.782 283.000 66q3¡~17lN 9031.19W 5986230.20 N 712317.98 E
17200.00 62.782 283.000 6673.27 N 9117.84W 5986247.63 N 712230.78 E
17300.00 62.782 283.000 6693.28 N 9204.48 W 5986265.07 N 712143.58 E
17400.00 62.782 283.000 6713.28 N 9291.13W 5986282.50 N 712056.37 E
17500.00 62.782 283.000 6733.28 N 9377.78 W 5986299.94 N 711969.17 E
17544.36 62.782 283.000 6742.16 N 9416.22 W 5986307.67 N 711930.49 E
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Magnetic Declination at Surface is 26.730° (04-Feb-02)
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 283.700° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 17544.36ft.,
The Bottom Hole Displacement is 11581.1 Oft., in the Direction of 305.603° (True).
5 February, 2002 . 8:54
Page 8 of 10
Alaska Drilling & Wells
NIAKUK
ogleg Vertical
ate Section Comment
OOft)
0.000 9993.45
0.000 10082.65
0.000 10171.84
0.000 10189.63 Top Kuparuk It
0.000 10230.48 Begin Dir @ 4.0000/100ft: 169L
MD, 8964.47ft TVD
4.000 10261.03
4.000 10297.96 End Dir, Start Sail @ 62.782° :
17041.49ftMD,8998.85ftTVD
Target - NK-11A T1 top Kuparuk,
Drillers
0.000 10349.99
0.000 10438.91
0.000 10527.83
0.000 10616.75
0.000 10705.67
0.000 10745.12 Total Depth:
17544.36ftMD,9228.85ftTVD
7" Casing
Kuparuk Zone 1 C (TD)
)
DriflQuest 2.00.09.006
NK-11A Proposed Plugback
~
Subject: NK.11A Proposed Plugback
Date: Mon, 04 Feb 2002 17:30:12.0900
From: Tom Maunder <tom_maunder@admin.state.ak.us>
To: Bill Isaacson <lsaacsWS@bp.com>
,-.
\)-Jt\ \t\K
Bill,
We have just talked with regard to the plug back on NK.11A. Based on the
drawings you sent and our discussion, you have approval to proceed as
planned. Please have your rig supervisor keep close watch when setting
the bottom plug to assure that returns are not lost. Your cement volume
is well in excess of that necessary to cover the top of the Kuparuk.
Provided there are not lost returns, it will not be necessary to tag the
plug.
Good luck.
Tom Maunder, PE
AOGCC
Tom Maunder <tom maunder@admin.state.ak.us>
Sr. Petroleum Engineer
Alaska Oil and Gas Conservation Commission
1 of 1
CÇ..~~~\ ù~~
\J~ ¡\~ ~) l rM\4 ()
~- fV l ::21 þ
2/6102 1 :25 PM
,.. ,-....
~
~~!Æ~~ lliF !Æ~!Æ~~~!Æ
.4.1 #A S IiA. OIL AND GAS
CONSERVATI ON COMMISSION
TONY KNOWLES, GOVERNOR
333 W. 7'" AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Lowell Crane
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage AK 99519-6612
Re:
Niakuk NK-llA
BP Exploration (Alaska), me.
Permit No: 202-002
Sur Loc: 1312' NSL, 1021' WEL, Sec. 36, TI2N, RI5E, UM
Btmhole Loc. 2490' NSL, 113' WEL, Sec. 27, TI2N, RISE, UM
Dear Mr. Crane:
Enclosed is the approved application for permit to redrill the above referenced well.
The permit to redrill does not exempt you from obtaining additional permits required by law
from other governmental agencies, and does not authorize conducting drilling operations until all
other required permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Sincerely,
Ct Ouj~< ~
C~ChSli Taylor
Chair
BY ORDER OF THE COMMISSION
. DATED thisllth day of January, 2002
jjc/Enclosures
cc:
Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
1a. Type of work 0 Drill II Redrill
0 Re-Entry 0 Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1312' NSL, 1021' WEL, SEC. 36, T12N, R15E, UM
At top of productive interval
2357' NSL, 4624' WEL, SEC. 26, T12N, R15E, UM
At total depth
2490' NSL, 113' WEL, SEC. 27, T12N, R15E, UM
12. Distance to nearest property line 113. Distance to nearest well
ADL 034630, 113' MD No Close Approach
16. To be completed for deviated wells
Kick Off Depth 10703' MD Maximum Hole Angle
18. Casin~ Program Specifications
$Ize
Hole Casino) Weioht Grade CouolinQ LenÇlth
8-1/2" 7" X 5-1/2" 29# /17# L-80 Hydrill511/ 7170'
~ STATE OF ALASKA ~
ALASKA ~ AND GAS CONSERVATION COMM ,ION
PERMIT TO DRILL
20 AAC 25.005
11 b Type of well 0 Exploratory Dßtratigraphic Test II Development Oil
. 0 Service 0 Development Gas ø Single Zone jÞ 0 Multiple Zone
5. Datum Elevation (DF or KB) 10. Field and Pool
Plan RKB = 52.75' Niakuk Oil Pool
6. Property Designation
ö3¥c,¡¡ððc ADL 034629 .AÞ
7. Unit or Property Name
Niakuk
8. Well Number
NK-11A
9. Approximate spud date
01/12/02 Amount $200,000.00
14. Number of acres in property 15. Proposed depth (MD and TVD)
2560 17730' MD / 9228' TVD
17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
0
79 Maximum surface 3363 psig, At total depth (TVD) 9175' / 4280 psig
Setting Depth
TQP Botom
MD TVD MD TVD
10550' 5715' 17730' 9228'
';J6-,A II q /0 l-
J1I4 fj III () /ö è.-
~D t>1 I/o I ø L
11. Type Bond (See 20 AAC 25.025)
Number 2S100302630-277
Ouantitv of Cement
(include staoe data)
470 sx Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
23885 feet
9392 feet
16812 feet
7416 feet
Length
Plugs (measured)
Bridge plug at 17800' with Cement on top. Top of Window
at 17460'; Top of Cement at 16812'
Junk (measured)
Size
Cemented
MD
TVD
80'
7995'
19983'
20"
13-3/8"
9-5/8"
260 sx Arcticset I (Approx.)
2646 sx PF 'E', 1373 sx 'G', 50 sx
750 sx Class 'G'
120'
8035'
20021'
RECEIVED
120'
5020'
8031'
true vertical
None
JAN 0 7 2002
Alaska Oil & :s~ Commission
Perforation depth: measured
None
20. Attachments II Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch II Drilling Program
II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Bil/lsaacson, 564-5521 Prepared By Name/Number: Terrie Hubble, 564-4628
21. I hereby certify that the true and the best of my knowledge
TitlE' RAnior Drilling Engineer
Permit Numb,er. . I ~ A]rO~1 Date See cover letter
2-07-.-00 \ \ \ 1\ for other requirements
Conditions of Approval: Samples Required 0 Yes B No Mud ~Óg ~quired 0 Yes g'No
Hydrogen Sulfide Measures ,~es 0 No Directional Survey Required ~Yes 0 No
Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU
Other: T~~ \- 6:1 P E 'þ '35 00 () ~ ' V-i&1\- ~ \
Approved By Original Sìgned ~v - Co 'ss'oner ~~e o~~~~i~sion Date \ \ \ (j':
Form 10-401 Rev. 12-01-85 C8nhllyOech¡¡fi U RIG I t\JA [ Su mit In ?;\Plicate
~,
/~
IWell Name:
I NK-11A
Drill and Complete Summary
I Type of Redrill (producer or injector): I Producer
Surface Location:
x = 721,541.9 / Y = 5,979,846.8
1312' F8L 1021' FEL 836 T12N R15E Umiat
x = 712,474.4 / Y = 5,985,911.3
2357' F8L 4624' FEL S26 T12N R15E Umiat
X = 711,702.7 / Y = 5,986,022.9
2490' FSL 113' FEL S27 T12N R15E Umiat
Target Location:
Bottom Hole Location:
I AFE Number: 15L 1504
I Estimated Start Date: 101/12/02
I Rig: I Doyon 14
I Operating days to complete: 125.75
I
I
I RKB: 152.75' I
1
I
I MD: 117,730' I
I TVD: 19228'
I
1
I Cellar Elevation: 119.1' I
I Well Design (conventional, slimhole, etc.): I Conventional Big Bore - 9-5/8" Sidetrack
I Objective: I
Niakuk Kuparuk Development
Formation Markers
Formation Tops MD TVDss Comments
Base Permafrost
SV3
SV1
Ugnu - UG4A 5321'
Ugnu - UG3 5671'
Kick-off Point 10,703' 5761' Kick-off in upper UG3 Sands
West Sak - WS2 11,652' 6152'
West Sak - WS1 12,690' 6805'
CM3 / K-12 13,577' 7310'
Tuffs 15,852' 8393'
Top HRZ 16,640' 8768' 10.9 ppg required as per HRZ shale study
Top Kuparuk 16,896' 8890' Est. pore pressure 4200 psi (9.1 ppg EMW at 8943' TVD)
Base 2A / Top 1 C 17,730' 9175' Est. pore pressure 4280 psi (8.9 ppg EMW at 9228' TVD)
TO 17,730' 9175'
CasingfTubing Program
Hole Size Csgl WtlFt Grade
Tbg O.D.
7"
tapered to
5-1/2"
4-1/2"
8-1/2"
29#
L-80
Conn Length Top
MDITVD
Hydril511/563 -5440' 10,550'/5715'
Tubing
17#
12.6#
L-80 Hydril 521
L-80 IBT-M
-1730' 16,000' / 8516'
-15,972' GL
Btm
MDITVD
16,000' / 8516'
17,730' / 9228'
16,000' /8513'
NK-11 A Permit to Drill
Page 1
,r--..
~.
Directional
KOP: 110,703' MD
Maximum Hole Angle:
-760 In original wellbore at 10,100'
-620 In sidetrack Tangent Interval 13,356' to 16,937' MD
-790 At TD after build in Reservoir Target Interval
All wells pass BP Close Approach guidelines. The nearest close approach
well is NK-08A which is -267' well-to-well at 13,419' MD and passes under
Major Risk rules.
Standard MWD Surveys with IFA & Calandra from kick-off to TD.
Close Approach Well:
Survey Program:
Mud Program
8-1/2" Production Hole I LSND
(10,703' to 17,730' MD)
Interval Density PV YP Tauo pH HTHP
(ppg) (cp) (lb/100fF) (lb/100fF) (cc's)
Milling 9.4 9-12 25-35 5-8
Ugnu 9.4 10-14 20-25 4-7 8.5- 9.5
West Sak 9.4 10-14 20-25 4-7 8.5- 9.5
Colville 9.4 - 9.6 10-14 20-25 4-7 8.5-9.5
Tuffs 9.6 10-14 20-25 4-7 8.5- 9.5
(increasing to 10.9)
HRl 10.9 12-17 20-25 4-7 8.5 -9.5 <9
Kuparuk 10.9 12-17 20-25 4-7 8.5 -9.5 <9
Logging Program
8 W' Intermediate 1
Production:
Drilling:
Open Hole:
Cased Hole:
FIRST BIT RUN to -350' above Top HRZ
MWD 1 GR - Realtime on first bit trip
SECOND BIT RUN to TD
MWD IGR IRes I PWD - Realtime over entire interval to TD.
Den 1 Neu - Recorded over entire interval to TD.
Sample catchers through the Kuparuk interval only.
No open hole logs are planned.
No cased hole logs are planned.
Cement Program
I Casing Size 17" x 5-1/2" Production Liner I
Basis: Lead: None .¡
Tail: Based on 1735' of open hole with 35% excess and 82' of 5-1/2" shoe joint.
Tail TOC: -16,000' MD (8513' TVD).- approximately 900' MD above top Kuparuk.
I Fluid Sequence & Volumes: Pre 70 bbls Chemical wash at 8.3 ppg
Flush
Spacer
Lead
Tail
30 bbls MudPUSH Viscosified Spacer weighted to 12.0 ppg
None
98 bbl I 550 fe I 470 sks of Dowell Premium Latex 'G' at 15.8
ppg and 1.17 disk, BHST 1900 I BHCT 1400, TT = 4.5 to 5 hrs
NK-11 A Permit to Drill
Page 2
.~
/""""\
Well Control
Well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular
preventer will be installed and is capable of handling maximum potential surface pressures. Based upon
calculations below, BOP equipment will be tested to 3500 psi.
Diverter, BOPE and drilling fluid system schematics on file with the AOGCC.
Production Section-
. Maximum anticipated BHP: 4280 psi @ 9175' TVOss - Kuparuk
. Maximum surface pressure: 3363 psi @ surface
(based on BHP and a full column of gas from TD @ 0.10 psi/ft)
.
Planned BOP test pressure:
Planned completion fluid:
3500 psi
9.4 ppg Brine / 6.8 ppg Diesel
.
Disposal
.
No annular injection in this well.
Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-
04. Any metal cuttings will be sent to the North Slope Borough.
Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to OS-04 for injection.
Haul all Class I wastes to Pad 3 for disposal.
.
.
NK-11A Permit to Drill
Page 3
~.
~,
Sidetrack and Complete Procedure Summary
Pre-Ria Work:
1. Test the FMC 9-5/8" mandrel packfff and tubing hanger seals to 5000 psi for 30 minutes.
2. Pressue test 9-5/8" casing to 3500 psi for 30 minutes.
3. Bleed tubing and annuli pressures to zero. Set a BPV in the tubing hanger and test from below to 1000 psi.
Secure well.
4. If necessary, level the pad. Please provide total well preparation cost on the handover form.
Ria Operations:
1. MIRU Doyon 14.
2. Bleed any pressure from wellbore through 9-5/8" annulus valve (BPV is set in tubing hanger).
3. Nipple down tree. Nipple up BOPE. Pull BPV.
4. Pull and lay down tubing hanger and single joint of 4-1/2" t~ing (well was left with 1 joint 4-1/2" hung below
hanger). Install BOP test plug and test BOPE to 250/3500 psi. Pull test plug.
5. MU 9-5/8" whipstock window milling assembly and RIH PU DP down through the proposed kick-off point at
-10,703' MD. POOH.
6. MU 9-5/8" bridge plug on DP (with MWD GR in BHA). Using the MWD GR to tie-in to planned kick-off depth,
RIH and set bridge plug to position top of whipstock at -10,703' MD (within Ugnu 3 formation). Displace well
to LSND milling fluid and POOH.
7. RIH with 9-5/8" Baker bottom-trip anchor whipstock assembly. Orient ~ipstock as desired and set on bridge
plug. Mill window in 9-5/8" casing at -10,703' MD. Perform FIT to 12.8 ppg EMW. POOH.
8. RIH with 8-1/2" drilling assembly (MWD/GR only) to whipstock. Kick-off and drill the 8-1/2" hole section as per
directional plan to -16,300' (-350' above the HRl), or as bit life allows. Trip for new drilling assembly
including MWD/GR/RES/NEU/DEN tools. RIH and drill to TD @ :t17,730' MD (9228' TVD). POOH.
9. Run and cement a tapered 7" x 5%" production liner, bringing cement -900' above)he Top Kuparuk. POOH.
10. Test the 9-5/8" casing and 7" x 5%" liner from the landing collar to surface to 3500 psi for 30 minutes.
11. Make up 4-3/4" clean-out assembly with 7" casing scraper. Space out the bit and 7" scraper to run the bit to
the landing collar and scraper to within 30' of the 7" x 5W' crossover. Displace the well to clean filtered brine
and spot high-vis perf pill in liner. POOH.
12. PU and RIH with¡DPC perf guns. Tie-in wi e-line & perf Kuparuk. POOH SB DP as allowed for next well.
13. Run 4-1/2",12.6# L-80 gas lift completion. Space-out tubing tail down into the 5-1/2" casing below the 7" x 5-
1/2" crossover. /
14. Set packer and test the tubing to 3500 psi and annulus to 3500 psi for 30 minutes.
15. Nipple down the BOPE. Nipple up and test the tree to 5000 psi.
16. Freeze protect the well to -100' below top GLM and secure the well. Rig down and move off.
Post-Ria Work:
1. Pull the ball and rod I RHC plug from below the production packer. Install gas lift valves.
NK-11A Permit to Drill
Page 4
".......
~
Job 1: MIRU
Hazards and Contingencies
> The two adjacent wells NK-10 and NK-12 are located 30.3' and 29.8' from NK-11 respectively. These
wells should not require well house removal and therefore, are not required to be shut-in for the NK-11A rig
move. If for any reason the well house on either one of these wells needs to be removed, policy requires
that the well be shut-in for the rig move. If shut-in is required, the wells will need to be shut-in at the
surface and the SSSV. All surface flowlines and gas lift lines will be depressured to header pressure.
Discuss the move at a pre-job safety meeting and designate a spotter to ensure there is no danger of a
collision.
> Heald Point Niakuk Pad is not designated as an H2S site, however Standard Operating Procedures for
H2S precautions should be followed at all times. Recent H2S data from the pad is as follows:
NK-11 Never Produced
Adjacent producers at Surface:
NK-09 20 ppm Aug 6, 01
NK-12B 0 ppm Aug 6, 01
NK-13 38 ppmJune 8, 00 (well is currently shut-in)
NK-29 25 ppm Aug 6, 01
Adjacent producers at TD:
NK-07 39 ppm Apr 02, 98 (well was shut-in 4th Quarter 1998)
NK-07A 20 ppm Aug 6, 01
NK-27 25 ppm Aug 6, 01
The maximum recorded level of H2S on the pad was 60 ppm from NK-28 on June 15,2000.
Post Permit to Drill and Summary of Drilling Hazards in the dog house and camp prior to spud.
.
,~""'~,
Job 2: Decomplete Well
Hazards and Contingencies
> NORM test all retrieved well head and completion equipment.
Job 3: Run Whipstock
Hazards and Contingencies
~ Once milling is complete, make sure all BOP equipment is operable. Wash out BOP stack to remove any
metal cuttings which may have settled out.
Job 7: Drillinq Intermediate/Production Hole
Hazards and Contingencies
~ No fault crossings are planned in the drilling of NK-11A. As planned, the well bore will drill parallel to the
large east/west-trending Niakuk fault with approximately 300' of separation at the Top Kuparuk Location
and approximately 200' at TD. This fault will be south of the wellbore when entering the Kuparuk target
and the target polygon should be adequately sized to assure this fault is avoided (it is critical that we stay
within the south hard line).
~ Cuttings gas and gas cut mud has been encountered within the West Sak interval at Niakuk. This interval
does not contain substantial amounts of hydrocarbons and will not require cement isolation. The most
recent Niakuk drilling history has shown this interval to be drilled with mud weights ranging from 9.1 to 9.3
ppg without any problems, nevertheless monitor for any signs of overpressure. The original NK-11 well
was drilled with 9.1 to 9.2 ppg mud through the Ugnu and West Sak intervals.
NK-11A Permit to Drill
Page 5
r---
~.
>- The NK-11 A well path will drill full sections of the Tuffs and HRZ shales, and both formations have been
troublesome in the Niakuk area. The Tuffs is typically slow and erratic drilling, which can wipe out a PDC
bit if proper drilling parameters are not maintained. The HRZ on the other hand has shown severe hole
instability problems. Follow all shale drilling practices to limit high ECD's, and maintain proper mud
weights and shale stabilizers in the drilling fluid.
>- The Kuparuk reservoir pressure is expected to be 4280 psi (8.9 ppg EMW) at the NK-11A bottom hole
location. Because of the high mud weights required to drill the surrounding shale intervals, we will be
drilling this interval with mud weights up to 10.9 ppg (-950 psi overbalance to Kuparuk). Based upon
offset drilling data, losses are not expected, however monitor the well closely while drilling this interval and
be prepared for potential losses by having fiberous LCM products on location. NK-62 encountered
pressures as low as 3000 psi (RFT data) within the Kuparuk interval, and the well was successfully drilled
without losses with mud weights of 10.6 ppg.
>- Differential sticking will be a problem if the drill string is left stationary for an extended period of time
across the long permeable sections of the Ugnu, West Sak and Kuparuk Sands. Minimize the time the
pipe is left stationary.
>- The kick tolerance for the 8W' open hole section would be 171 bbls assuming a kick from the Kuparuk at
-16,896' MD. This is a worst case scenario based on an 9.3 ppg pore pressure gradient, a fracture
gradient of 12.4 ppg at the 9-5/8" window, and 10.9 ppg mud in the hole.
~ Drilling Close Approach: All wells pass BP Close Approach guidelines, however there are several wells in
close proximity and limit allowable deviation from the planned directional path. The nearest close
approach well is NK-08A which is -268' well-to-well at 13,418' MD and passes under Major Risk rules.
Note Anticollision Report for tolerance lines and allowable deviation from the planned NK-11 A well-path.
_.....~=.,
,,~"~....~w. .,
.......=" mp...
Job 9: Install 7" x 5%" Production Liner
Ha~~sandConUngen~es
>- Long shale intervals will be exposed while running the liner. Rotation of the liner may be necessary if
downward progress is not possible.
~ Differential sticking is a major concern across the long Ugnu and West Sak sand intervals. The 10.9 ppg
required for well bore stability of the HRZ will be substantially over balanced to these formations. Prior to
running casing, hold a Pre-Job Safety Meeting to raise awareness of the high risk of differential
sticking. Communicate individual responsibilities to all members of rig team and review
connection I tripping practices to minimize the time the pipe is left stationary.
~ Ensure the liner top packer is set prior to POOH. This may require going through the setting process
twice. Slack off with rotation to the maximum allowable down weight, as per Baker representative.
.-~..,"~
='.m~x'
,'. "','=.. =,-.,~w. ..>om.. ..
Job 11: Liner Clean-out
Hazards and Contingencies
. No hazards identified for this section of the well.
,","" ","wo.
=...,~ ,-..
n ,. ~ -',-
Job 10: DPC perforate
Hazards and ConUngencies
. At 9.4 ppg, the perforating /completion fluid will provide -170 psi overbalance to the estimated Kuparuk
pressure of 4200 psi. This pressure estimate is +/-100 psi, therefore, monitor the well closely after
perforating for any signs of inadequate overbalance.
NK-11A Permit to Drill
Page 6
.~
~\
Job 12: Run Completion
Hazards and Contingencies
~ Diesel will be used to freeze protect the well. The diesel flash point is 100° F. Diesel vapor pressure is -
0.1 psia at 100° F.
Job 13: ND/NUlRelease Ria
Hazards and Contingencies
~ See Job 1 for adjacent well spacing. These are close well centers. Identify hazards in a pre move
meeting, and take every precaution to ensure good communication prior to beginning the rig move. Use
spotters when moving the rig.
NK-11A Permit to Drill
Page 7
r-"',
~
TREE: 4-1/16' - 5M CIW Non-Chrome
WELLHEAD: 135/8" - 5M Universal
NK-11 Current Status
RT-GL ~ 40.7'
GL-SL ~ 19.1'
RT-BF ~ 39.5'
Diesel
~
Freeze protect with diesel down to 2206' MD
13-3/8'.68 #/ft, L80,
I 8,035' I..
Sea Water
Two Cement Plugs
Tag top of 17.0 ppg cement plug at
.,/
/'
16,812' I
Top of 60' section cut in 9-5/8" casing
I 17,460' I
BridgePlugin9-5/8"casingat 17,800' I
Base of 17.0 ppg cement plug
I 17,785' I
Top of window from Second I 18,527' I
WhiDstock at
17.0 ppg Fresh Water Mud
in open hole between cement plugs
Top of window from First
Whiostock at
I 18,652' I
95/8", 47#/ft, L80, BTC-M I 20,021' I
1 22,861' I
21,302" - 20,052'
20,520' - 19,888'
Nk-11PB2
Kuparuk
1+1-23,210'1
Nk-11PB1
8-1/2" Hole TD (Base Cement Plug)
1 23,885' I
Date
12/18/98
Rev By
WSI
Comments
Niakuk
WELL: NK-11
API NO: 50-029-22789
Current Condition
Shared Services Drilling
NK-11A Proposed Completion
TREE: 4-1/16" - 5M CIW Carbon
WELLHEAD: 135/8" - 5M FMC Universal
Cellar Box Elevation = 19.1'
Doyon 14 RKB = 52.75'
4-1/2" Halliburton 'Series 10' tubing retrievable SSSV.
I 2050"
13-3/8",68 #/ft, L-80, BTC
I 8035' I
a
~
4-1/2" Gas Lift Mandrels with handling pups installed.
L
GAS LIFT MANDRELS
# TVD Size Valve Type
1 TBD 4-1/2" x 1-1/2" DV
2 TBD 4-1/2" x 1-1/2" RP Shear
3 TBD 4-1/2" x 1-1/2" DV
4 TBD 4-1/2" x 1" DV
5 TBD 4-1/2" x 1" DV.
6 TBD 4-1/2" x 1" DV
L
L.
- 4-1/2" 12.6# L-80, IBT Tubing
Þi
~
1+/-10,550'1 BAKER 7" x 9-518" Liner Tie Back Sleeve
ZXP Liner Top Packer
'Flex Lock' Hydraulic Liner Hanger
Window Milled from Whipstock............. ~ \. '
TopofWindowat+I-10,703'MD ............. ~
Bridge Plug set at +1-10,727' MD --.:. ~
Top of 17.0 ppg cemenY&A plug
tagged at 16,812' MD
4-1/2" 'x' Landing Nipple with 3.813" seal bore.
T x 4-1/2" Baker 'S-3' Production Packer
4-1/2" 'X' Landing Nipple with 3.813" seal bore.
4-1/2" 'XN' Landing Nipple with 3.813" seal bore and 3.725" No-Go ID.
4-1/2" Flush Wireline Entry Guide spaced-out into 5-1/2" casing.
7" x 5-1/2" crossover I +/-16,000' I
9-5/8",47 lIft, L-80, BTC-M Casing extends
down to 20,021' MD. See NK-11 Current Status
Schematic for details of remaining wellbore.
Plug Back Depth I +/-17,645' I
7", 29 #/ft, L-80, Hydril 511 & 563 1
tapered to +/-17,730' I
5-1/2" 17 #/ft, L-80 Hydril 521
Date
Rev By
WSI
Comments
NIAKUK
WELL: NK-11A
API NO: 50-029-22789-01
01/02/02
Proposed Completion
GPB Drilling & Wells
:~~f~~~.5.' I NBop~~ Slope Alaska
A H'"",,"", CQ"P..V
Proposal Data for NK-11A WPO9
Vertical Origin:
Horizontal Origin:
Measurement Units:
North Reference:
Well
Well
ft
True North
Dogleg severity: Degrees per 100 feet (US)
Vertical Section Azimuth: 272.780°
Vertical Section Description: Well
Vertical Section Origin: 0.00 NoO.DO E
Measured Incl. Azim.
Depth
10702.95
10722.95
11666.68
13091.50
13355.95
15655.08
15866.98
16895.98
16916.97
16936.97
17730.69
L_..._.m
7200 -
~
ã5
~
C/)
g>~ 6400-
.-0
.co
tOO
0 II
Z-§
.S;
74.688
74.911
51.000
51.000
61.578
61.578
61.560
61.560
61.560
61.560
79.285
323.142
320.666
265.340
265.340
265.359
265.359
275.000
275.000
275.000
275.000
284.775
Vertical
Depth
5755.24
5760.49
6214.10
7110.77
7257.33
8351.63
8452.70
8942.75
8952.75
8962.27
9227.75
I DrilIQues{'
Current Well Properties
NK-11A WP09
5979846.80 No 721541.89 E
5647.48 S, 5399.02 E
70° 20' 50.0070" N, 148° 12' 05.0297" W
NIAKUK
NK-11A WPO9
Well:
Horizontal Coordinates:
Ref. Global Coordinates:
Ref. Structure:
Ref. Geographical Coordinates:
RKB Elevation:
Northings Eastings Vertical Dogleg North Reference:
Section Rate Units:
6158.08 N 3740.05 W 4034.32
6173.27 N 3751.95 W 4046.95 12.000
6521.85 N 4458.94 W 4770.01 5.700
6431.89 N 5562.57 W 5867.98 0.000
6414.08 N 5781.51 W 6085.80 4.000
6250.48 N 7796.89 W 8090.87 0.000
6251.06 N 7982.91 W 8276.70 4.000
6329.92 N 8884.28 W 9180.83 0.000
6331.53 N 8902.68 W 9199.28 0.000
6333.06 N 8920.19 W 9216.86 0.000
6464.25 N 9652.29 W 9954.45 2.514
~Q
¡t;:\Q <£-~
,,<o~ ri>'1I
~. S)~
!;l? ~:~ J\>
~ .,0/ (~
~ <¡~ ".,~"> <¡i}'" ¿j-""
~ & . ~ <¡
.."^f'i ",,'?- #' .*,Y 0. ¿>
is" v 0' 0\" <:;,' ¿Y
,,~l~'è'¿;'~.¿;.v'" .,<:>" ,<f ^-.",,<:¡;
7"Casing ð-'li",,"?-,,?-'è @ ^-.'" ¡ç
17730.6911 MD /. /. '\. "'.*'. '.¡J> Q~ +,>'" ,>",4
9227'7::,<#..II~D(,:..- .'" '9J;~,:,>"?- "",,?-*'
,- / ","" ~*'
:. 21.:/(: -"",000 -:-£Lø ."
. - -114 WPO9 . ~ lBOO.OO
NK.11A
Q) .' 92?7.75:~ c .
ro 6464.25 N. "6,,2.29 W
ð5 5600-
~....~..--.nnnnnMn
I
-9600
Scale: 1 inch = 800ft
NK.1ìA kup Target
8942.75ft TVe
6329.$2 N. S8S4.28 W
I
-8800
~
$'
~')i
<}<>
¡t;:\Q of'
,,<!,~ J,"
~. '>":>(11
.,'Þ' "~<!,
¡t;:\Q ~Q ~~Q' f.,:,
4>'1> -<:-~ .,'t' ",~i$
~. <!,. ""',, $"
~'Ii ".." """ ~:"
..-t.Q S), 0 '. ~ ~
~~- ~, <!,<!, .Jf~'
,j,"Þ <o<!,~ 'Ii'..... <0'" .<IY:"'...
~ .... ", @.. !o)~
,,0;,"> o;,~ <.- \ -~ .~~<S
0"" \ ~,,"'~
,,>'1> ~. '-. <!ß>~ .§>"!1t.
~. # \ . ~ ~..
@ ~~ \:".",', <:I ,,<!' @
-~ ~. \, ,~<;>~ .,.<t
~ @ ~ @~
4Þ~ <:I ~ \\ <1: <!
\. !:- .
<:1'$ j100~'00 \ .".' ~~
~~ ~ 150000 \, øf..'ii
¡" / F'. \""Y'
.~M I
\
\
\
"
~"H'
\
tfQ ....Q
,,<S ~"-
,;.">'11 ,,~
S)' ~<o
~'I>" ~Q~
<0'1>"'" <§.~
!i)':' '0.,<0'0'
.",'? ~."
",<;@ <!,<ß\"<S
",.l @~.
<!l' <:I
"'~ <1>J;~
~500j /1
I
-8000
tI""'M
i""°M
-I'M""
I
-7200
I
-6400
Eastings (Well)
I
-5600
52.75ft above Mean Sea Level
52.75ft above Structure
True North
Feet (US)
)
)
I
-4800
I
-4000
I
-3200
Reference is True North
NIAKUK
NK-11A WPO9
I DrilIQues{'
5iper"f'"1Y::5L.J!J I North Slope Alaska
gB.LbJ"J1i!i!!,..~VLç:Jæã B P XA
AH",."'no""""","¥
Current Well Properties
NK-11A WP09
5979846.80 N, 721541.89 E
5647.48 S, 5399.02 E
70020' 50.0070" N, 1480 12' 05.0297" W
Proposal Data for NK-11A WPO9
'Well:
Horizontal Coordinates:
Ref. Global Coordinates:
Ref. Structure:
Ref. Geographical Coordinates:
RKB Elevation:
52. 75ft above Mean Sea level
52. 75ft above Structure
True North
Feet (US)
Vertical Origin:
Horizontal Origin:
Measurement Units:
North Reference:
Well
Well
ft
True North
Dogleg severity: Degrees per 100 feet (US)
Vertical Section Azimuth: 272.780'
Vertical Section Description: Well
Vertical Section Origin: 0.00 N,O.OO E
Measured Incl. Azim. Vertical Northings Eastings Vertical
Depth Depth Section
10702.95 74.688 323.142 5755.24 6158.08 N 3740.05 W 4034.32
10722.95 74.911 320.666 5760.49 6173.27N 3751.95W 4O4ó.95
11666.68 51.000 265.340 6214.10 6521.85 N 4458.94 W 4770.01
13091.50 51.000 265.340 7110.77 6431.89N 5562.57W 5867.98
13355.95 61.578 265.359 7257.33 6414.08 N 5781.51 W 6085.80
15655.08 61.578 265.359 8351.63 6250.48 N 7796.89 W 8090.87
15866.98 61.560 275.000 8452.70 6251.06 N 7982.91 W 8276.70
16895.98 61.560 275.000 8942.75 6329.92 N 8884.28 W 9180.83
16916.97 61.560 275.000 8952.75 6331.53 N 8902.68 W 9t99.28
16936.97 61.560 275.000 8962.27 6333.06 N 8920.19 W 9216.86
17730.69 79.285 284.775 9227.75 6464.25N 9652.29W 9954.45
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -UGIV4A. "õ;'if15ff ¡yo
Exit: Start Dir @ 12.00'1100ft, 85.00' Left TF : 107D2.95ftMD,5755.24ftTVD
Dir @ 5.70'1100ft: 10722.95ft MD, 5760.4911 TVD
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ 572î75fT7'íJi'J
North Reference:
Units:
.t::
0
0
Q)
II
.s:::.
()
.s
5850 -
Dlr, Start Sail @ 51.0D': 11666.68I1MD,6214.10ftTVD
------------
------------------------------------ W.'-'2. !i2M75ftTVD
6750 -
~
Q)
~
..c
+-'
a..
Q)
0
(ij 7650 -
u
'-e
Q)
>
-------------------------- .VS1. 6857:?5ftNO
Begin Dir @ 4.00'1100lt: 13091.5011 MD. 7110.7711 TV[}-'---
End Dir, Start Sail @ 61.58': 13355.95I1MD.7257.33I1TVD
------------------- CM<'.!'!6'f[j."fi!vD
--- - ------ - -- ----- ---
Begin Dir @ 4.00'/10011: 15655.0811 MD, 8351.63ftTV[)--__~
- - - - - - - - - - - - - - - - - - ----1'!!.d,pir, Start §.ail~' ..;.1§,8~M,p,J!:I521!!!!.TY.D.::=-..
"",,^,,---------------
NK..11A Kuparuk Target ,uifs, M4Sj5N Tvn
a942.75ft TVD
---------- 6329.92N,ßS3423W
- - - - - - - - - - == = = = = = = = = = = = = = = = = = = =;;':;:1AKU"T~r;¡nri:iers~~y @94~~00= = = = = = ~'i~K"P:: :~;;:;:;~~
8550 -
Begin Dlr @ 2.51"/10Dft: 16936.9711 MD, 8962.2711TVD ..----- "'1(:114 WA 7400.00 NK.1iA 8iiL DríilH$ Poly
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - '7"Cãsing- :!I.!t:::: KûPiiñik Zõn,,'c (TW. 9??775!1 TV£)
17730.69ft MD / NK-11A BHL Target
9227.75ftTVD ¡ \122"!:15ft TVD
Total Depth: 17730.69ftMD,9227.75ftTV 6464.26 N. 9652.29 VI
I I I
8550 9450 10350
Section Azimuth: 272.7800 (True North)
å5
~ 9450 -
en
I
4950
I
5850
I I
6750 7650
Vertical Section (Well)
I I
3150 4050
Scale: 1 inch = 900ft
~."'~.u.~MMM"
Dogleg
Rate
12.000
5.700
D.OOO
4.000
D.OOO
4.000
D.OOO
0.000
D.OOO
2.514
)
I
)
)
Revised: 3 January, 2002
PROPOSAL REPORT
3 January, 2002
)
Surface Coordinates: 5979846.80 N, 721541.89 E (70020' 50.0070" N, 148012' 05.0297" W)
Surface Coordinates relative to Project H Reference: 979846.80 N, 221541.89 E (Grid)
Surface Coordinates relative to Structure: 5647.48 S, 5399.02 E (True)
Kelly Bushing: 52.75ft above Mean Sea Level
speI""'I""'Y-5U"
DRIL.L.ING seRVices
A Halliburton Company
Proposal Ref: pr011068
Sperry-Sun Drilling Services
Proposal Report for NK-11A WPS
Revised: 3 January, 2002
Alaska Drilling & Wells
North Slope Alaska NIAKUK
Measured Sub-Sea Vertical Local Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (o/100ft)
NK-11 Reca
0.00 0.000 0.000 -52.75 0.00 0.00 N 0.00 )
100.00 0.076 31.562 47.25 100.00 0.04N 0.076 -0.02
200.00 0.051 78.389 147.25 200.00 0.10 N 0.056 -0.10
300.00 0.115 30.974 247.25 300.00 0.21 N 0.089 -0.19
400.00 0.094 90.487 347.25 400.00 0.105 -0.32
500.00 0.162 115.519 447.25 0.54 E 5979847.04 N 721542.42 E 0.086 -0.53
600.00 0.181 122.340 547.25 0.81 E 5979846.90 N 721542.69 E 0.028 -0.80
700.00 0.097 87.563 647.25 1.02 E 5979846.83 N 721542.91 E 0.116 -1.02
800.00 0.070 97.273 747.25 1.16 E 5979846.83 N 721543.05 E 0.030 -1.16
900.00 0.210 88.477 847.2 1.41 E 5979846.83 N 721543.30 E 0.141 -1.41
1000.00 0.221 76.520 947.25 0.04N 1.78 E 5979846.89 N 721543.67 E 0.046 -1.78
1100.00 0.227 72.207 1047.25 0.14 N 2.16 E 5979847.01 N 721544.05 E 0.018 -2.15
1200.00 0.193 64.227 1147.25 0.28 N 2.50 E 5979847.15 N 721544.38 E 0.045 -2.48
1300.00 0.225 63.118 1247.25 0.44 N 2.83 E 5979847.33 N 721544.71 E 0.033 -2.80
1400.00 0.157 59.347 1347.24 0.60 N 3.12 E 5979847.49 N 721544.99 E 0.069 -3.09
1500.00 0.097 61.526 1447.24 1499.99 0.71 N 3.31 E 5979847.61 N 721545.18 E 0.060 -3.28
1600.00 0.071 28.206 1547.24 1599.99 0.81 N 3.41 E 5979847.71 N 721545.28 E 0.054 -3.37
1700.00 0.107 57.109 1647.24 1699.99 0.90 N 3.53 E 5979847.81 N 721545.39 E 0.057 -3.48
1800.00 0.279 349.911 1747.24 1799.99 1.16 N 3.56 E 5979848.07 N 721545.41 E 0.257 -3.50 )
1900.00 1.048 355.474 1847.24 1899.99 2.26 N 3.47 E 5979849.16 N 721545.30 E 0.771 -3.36
2000.00 2.697 346.282 1947.18 1999.93 5.51 N 2.85 E 5979852.40 N 721544.58 E 1.670 -2.58
2100.00 3.564 337.373 2047.03 2099.78 10.66 N 1.12 E 5979857.48 N 721542.69 E 0.992 -0.60
2200.00 4.879 330.246 2146.76 2199.51 17.17 N 2.20W 5979863.89 N 721539.18 E 1.413 3.03
2300.00 6.852 331.359 2246.23 2298.98 26.08 N 7.18W 5979872.66 N 721533.94 E 1.976 8.44
2400.00 8.877 333.303 2345.29 2398.04 38.23 N 13.46 W 5979884.62 N 721527.30 E 2.042 15.30
2500.00 10.975 329.693 2443.78 2496.53 53.34 N 21 .78 W 5979899.47 N 721518.54 E 2.187 24.35
2600.00 12.855 330.452 2541.64 2594.39 71.18 N 31.99 W 5979917.01 N 721507.81 E 1.887 35.41
2700.00 16.174 328.563 2638.43 2691.18 92.75 N 44.80 W 5979938.19 N 721494.37 E 3.352 49.24
2800.00 18.801 329.406 2733.77 2786.52 118.60 N 60.32 W 5979963.56 N 721478.09 E 2.638 66.00
2900.00 21 .550 329.775 2827.68 2880.43 148.24 N 77.62 W 5979992.69 N 721459.92 E 2.752 84.72
"""""'...-....... .............
3 January, 2002 - 16:35 Page 2 of 17 DriflQuest 2.00.09.006
Sperry-Sun Drilling Services
ProposalReportforNK-11A WPS
Revised: 3 January, 2002
Alaska Drilling & Wells
North Slope Alaska NIAKUK
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (O¡100ft)
3000.00 24.491 329.158 2919.71 2972.46 181.94N 439.11 E 2.951 106.15
3100.00 27.905 327.989 3009.41 3062.16 219.61 N 414.94 E 3.453 131.02
3200.00 30.536 328.308 3096.70 3149.45 261.01 N 87.94 E 2.636 158.79
3300.00 33.858 328.751 3181.46 3234.21 306.25 N 58.93 E 3.331 188.63 )
3400.00 37.037 329.869 3262.92 3315.67 356.09 N 721327.88 E 3.244 220.61
3500.00 40.254 330.419 3341.05 3393.80 9. N 721295.26 E 3.235 254.23
3600.00 43.583 330.719 3415.42 3468.17 5980307.12 N 721260.71 E 3.335 289.85
3700.00 46.656 330.879 3485.88 3538.63 5980368.01 N 721224.30 E 3.075 327.41
3800.00 49.411 330.804 3552.68 3605.43 338.21 W 5980431.93 N 721186.23 E 2.756 366.69
3900.00 51.805 330.564 3616.24 3668.99 376.01 W 5980498.09 N 721146.46 E 2.401 407.71
4000.00 54.076 330.430 415.28 W 5980566.34 N 721105.15 E 2.274 450.30
4100.00 57.017 329.988 456.19 W 5980636.57 N 721062.15 E 2.963 494.62
4200.00 59.956 329.830 499.06 W 5980709.07 N 721017.11 E 2.943 541.03
4300.00 63.224 330.031 543.17W 5980783.97 N 720970.77 E 3.272 588.78
4400.00 64.872 330.260 587.99 W 5980860.66 N 720923.66 E 1.661 637.34
4500.00 65.696 330.274 3918.46 3971.21 1110.44 N 632.88 W 5980938.05 N 720876.46 E 0.824 685.99
4600.00 67.203 330.498 3958.45 4011.20 1190.10 N 678.22 W 5981016.33 N 720828.79 E 1.521 735.14
4700.00 69.414 330.674 3995.28 4048.03 1271.09 N 723.85 W 5981095.94 N 720780.79 E 2.216 784.64
4800.00 70.313 330.978 4029.29 4082.04 1353.18 N 769.72 W 5981176.64 N 720732.51 E 0.944 834.44
4900.00 70.937 331.241 4062.36 4115.11 1435.81 N 815.31 W 5981257.88 N 720684.49 E 0.671 883.99
5000.00 71.584 331.488 4094.57 4147.32 1518.91 N 860.67 W 5981339.60 N 720636.70 E 0.688 933.32 )
5100.00 72.636 331.587 4125.52 4178.27 1602.53 N 905.94 W 5981421.85 N 720588.98 E 1.056 982.60
5200.00 73.319 331.444 4154.67 4207.42 1686.68 N 951.41W 5981504.62 N 720541.04 E 0.696 1032.10
5300.00 72.893 330.016 4183.74 4236.49 1770.13 N 998.21 W 5981586.65 N 720491.79 E 1.431 1082.89
5400.00 73.243 330.084 4212.62 4265.37 1853.07 N 1046.04 W 5981668.14 N 720441.53 E 0.356 1134.69
5500.00 73.279 330.141 4241.46 4294.21 1936.06 N 1093.80W 5981749.68 N 720391.34 E 0.065 1186.41
5600.00 73.644 330.280 4270.09 4322.84 2019.24 N 1141.36W 5981831.42 N 720341.34 E 0.389 1237.95
5700.00 73.904 330.432 4298.08 4350.83 2102.70 N 1188.79 W 5981913.44 N 720291 .46 E 0.298 1289.38
5800.00 73.470 330.173 4326.06 4378.81 2186.09 N 1236.37W 5981995.39 N 720241.44 E 0.501 1340.94
5900.00 71 .903 330.370 4355.86 4408.61 2268.96 N 1283.74 W 5982076.82 N 720191.64 E 1.578 1392.28
3 January, 2002 - 16:35
Page 3 of 17
DriflQuest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for NK-11A WPS
Revised: 3 January, 2002
Alaska Drilling & Wells
North Slope Alaska NIAKUK
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) ("/100ft)
6000.00 72.906 330.363 4386.03 4438.78 2351.83 N 142.07 E 1.003 1443.38
6100.00 73.005 330.524 4415.55 4468.30 2434.94 N 92.51 E 0.183 1494.48
6200.00 73.588 330.764 4444.23 4496.98 2518.43 N 43.09 E 0.626 1545.45
6300.00 73.137 330.846 4473.01 4525.76 2602.03 N 93.92 E 0.457 1596.17 )
6400.00 73.740 330.938 4501.29 4554.04 2685.83 N 7 9944.80 E 0.609 1646.84
6500.00 73.297 330.998 4529.47 4582.22 N 719895.79 E 0.446 1697.40
6600.00 73.961 331.106 4557.98 4610.73 1 5982651.53 N 719846.95 E 0.672 1747.80
6700.00 74.442 331.020 4585.19 4637.94 1 5982734.34 N 719797.93 E 0.488 1798.38
6800.00 74.277 330.967 4612.17 4664.92 1704.57 W 5982817.12 N 719748.74 E 0.173 1849.13
6900.00 74.310 331.096 4639.03 4691.78 1751.23 W 5982899.97 N 719699.61 E 0.128 1899.82
7000.00 74.540 331.084 4665.91 1797.76 W 5982982.89 N 719650.60 E 0.230 1950.39
7100.00 74.713 330.950 4692.3 1844.47 W 5983065.84 N 719601.42 E 0.217 2001.14
7200.00 74.972 330.820 4718.8 1891.43 W 5983148.64 N 719551.98 E 0.288 2052.13
7300.00 75.215 330.929 4744.30 1938.58 W 5983231.64 N 719502.36 E 0.265 2103.32
7400.00 73.521 331.330 4771.48 1985.04 W 5983314.51 N 719453.43 E 1.737 2153.81
7500.00 71 .801 331.586 4801.12 4853.87 3611.83 N 2030.66 W 5983397.02 N 719405.35 E 1.738 2203.45
7600.00 71 .360 331.638 4832.81 4885.56 3695.27 N 2075.75 W 5983479.10 N 719357.82 E 0.443 2252.53
7700.00 72.066 331.656 4864.49 4917.24 3778.75 N 2120.76 W 5983561.21 N 719310.35 E 0.705 2301.54
7800.00 72.465 331.749 4895.04 4947.79 3862.62 N 2165.86 W 5983643.71 N 719262.80 E 0.409 2350.65
7900.00 73.053 331.560 4924.50 4977.25 3946.72 N 2211.22 W 5983726.44 N 719214.97 E 0.615 2400.04
8000.00 74.182 331.631 4952.58 5005.33 4031.11 N 2256.94 W 5983809.44 N 719166.78 E 1.131 2449.80 )
8100.00 73.996 331.620 4980.16 5032.91 4115.70 N 2302.60 W 5983892.63 N 719118.64 E 0.186 2499.51
8200.00 74.246 331.385 5007.71 5060.46 4200.17 N 2348.48 W 5983975.72 N 719070.28 E 0.337 2549.43
8300.00 73.588 330.827 5035.21 5087.96 4284.39 N 2394.85 W 5984058.53 N 719021.44 E 0.849 2599.83
8400.00 73.782 329.411 5063.07 5115.82 4367.69 N 2442.65 W 5984140.38 N 718971.20 E 1.372 2651.61
8500.00 73.463 328.640 5091.34 5144.09 4449.91 N 2492.06 W 5984221.10 N 718919.38 E 0.806 2704.95
8600.00 73.174 327.209 5120.13 5172.88 4531.07 N 2542.89 W 5984300.72 N 718866.18 E 1.401 2759.66
8700.00 72.875 326.008 5149.25 5202.00 4611.02 N 2595.42 W 5984379.08 N 718811.30E 1.1 88 2816.01
8800.00 73.090 325.227 5178.26 5231.01 4690.06 N 2649.37 W 5984456.49 N 718755.04 E 0.777 2873.73
8900.00 73.181 323.843 5207.38 5260.13 4767.77 N 2705.16 W 5984532.53 N 718696.98 E 1.327 2933.22
3 January, 2002 - 16:35
Page 4 of 17
DrillQuest 2.00.09.006
Sperry-Sun Drilling Services
ProposalReportforNK-11A WPS
Revised: 3 January, 2002
Alaska Drilling & Wells
North Slope Alaska NIAKUK
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) ("/100ft)
9000.00 73.166 323.547 5236.49 5289.24 4844.85 N 638.06 E 0.284 2993.56
9100.00 73.009 323.391 5265.68 5318.43 4921.70 N 78.87 E 0.217 3054.16
9200.00 72.121 323.299 5295.92 5348.67 4998.19 N 19.76 E 0.892 3114.67
9282.66 72.513 323.270 5321.00 5373.75 5061.30 N 70.80 E 0.475 3164.80 UGN4A )
9300.00 72.494 323.255 5326.21 5378.96 5074.56 N 718460.52 E 0.139 3175.32
9400.00 72.369 323.317 5356.64 5409.39 N 718401.22 E 0.138 3236.02
9500.00 72.605 323.574 5386.54 5439.29 5984981.97 N 718342.18 E 0.340 3296.47
9600.00 73.488 323.517 5416.28 5469.03 3 5985057.09 N 718283.25 E 0.885 3356.82
9700.00 74.062 323.703 5444.39 5497.14 3160.28 W 5985132.51 N 718223.92 E 0.600 3417.57
9800.00 74.388 323.753 5471.30 5524.05 3217.18W 5985208.51 N 718164.75 E 0.330 3478.17
9900.00 74.998 323.496 3274.43 W 5985284.52 N 718105.22 E 0.658 3539.13
10000.00 75.500 323.312 3332.11 W 5985360.45 N 718045.27 E 0.533 3600.51
10100.00 75.769 323.194 3390.04 W 5985436.19 N 717985.08 E 0.292 3662.12
10200.00 75.401 323.081 3448.11 W 5985511.92 N 717924.74 E 0.384 3723.89
10300.00 75.074 323.160 3506.19W 5985587.55 N 717864.40 E 0.336 3785.65
10400.00 75.103 323.068 5623.69 5676.44 5924.28 N 3564.25 W 5985663.13 N 717804.08 E 0.093 3847.39
10500.00 75.137 323.090 5649.28 5702.03 6001.59 N 3622.29 W 5985738.69 N 717743.78 E 0.040 3909.11
10582.99 74.902 322.982 5671.00 5723.75 6065.58 N 3670.45 W 5985801.23 N 717693.74 E 0.309 3960.32 UG3
10600.00 74.940 322.977 5675.42 5728.17 6078.70 N 3680.35 W 5985814.05 N 717683.47 E 0.226 3970.84
10700.00 74.668 323.144 5701.71 5754.46 6155.80 N 3738.34 W 5985889.41 N 717623.22 E 0.317 4032.50
10702.95 74.688 323.142 5702.49 5755.24 6158.08 N 3740.05 W 5985891.63 N 717621.45 E 0.684 4034.32 ST Exit: Start Dir @ 12.000/10r )
85.00° Left TF :
10702.95ftMD,5755.24ftTVD
3 January, 2002 - 16:35
Page 5 of 17
DrillQuest 2.00.09.006
Sperry-Sun Drilling Services
Proposa/ReportforNK-11A WPS
Revised: 3 January, 2002
Alaska Drilling & Wells
North Slope Alaska NIAKUK
Measured Sub-Sea Vertical Local Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (o/100ft)
NK-11A WP09
10722.95 74.911 320.666 5707.74 5760.49 6173.27 N 3751.95 W 12.000 4046.95 Begin Dir @ 5.700/100ft: 10722.95ft
MD, 5760.49ft TVD )
10800.00 72.260 317.014 5729.51 5782.26 6228.91 N 717558.85 E 5.700 4098.21
10900.00 68.926 312.112 5762.75 5815.50 6295.08 N 717489.79 E 5.700 4168.47
11000.00 65.739 306.989 5801.31 5854.06 6353.85 N 717417.01 E 5.700 4242.32
11100.00 62.732 301.611 5844.80 5897.55 640 717341.22E 5.700 4319.02
11200.00 59.942 295.945 5892.79 4089.94 W 5986169.96 N 717263.17 E 5.700 4397.80
11300.00 57.408 289.966 5944.81 4168.51 W 5986200.97 N 717183.65 E 5.700 4477.90
11400.00 55.173 283.660 6000.34 4248.05 W 5986222.70 N 717103.43 E 5.700 4558.52
11500.00 53.281 277.032 6058.84 4327.78 W 5986234.95 N 717023.30 E 5.700 4638.86
11600.00 51.773 270.103 6119.7 4406.90 W 5986237.59 N 716944.07 E 5.700 4718.13
11651.80 51.156 266.412 6522.68 N 4447.39 W 5986235.17 N 716903.64 E 5.700 4758.51 WS2
11666.68 51.000 265.340 6521.85 N 4458.94 W 5986233.99 N 716892.12 E 5.700 4770.01 End Dir, Start Sail @ 51.00° :
11666.68ftMD,6214.10ftTVD
11700.00 51 .000 265.340 6182.32 6235.07 6519.75 N 4484.74 W 5986231.13 N 716866.38 E 0.000 4795.68
11800.00 51.000 265.340 6245.25 6298.00 6513.43 N 4562.20 W 5986222.53 N 716789.15 E 0.000 4872.74
11900.00 51.000 265.340 6308.18 6360.93 6507.12 N 4639.66 W 5986213.93 N 716711.91 E 0.000 4949.80
12000.00 51.000 265.340 6371.11 6423.86 6500.80 N 4717.12 W 5986205.33 N 716634.67 E 0.000 5026.86
12100.00 51.000 265.340 6434.04 6486.79 6494.49 N 4794.58 W 5986196.73 N 716557.43 E 0.000 5103.92
12200.00 51.000 265.340 6496.98 6549.73 6488.18 N 4872.03 W 5986188.13 N 716480.20 E 0.000 5180.98 )
12300.00 51.000 265.340 6559.91 6612.66 6481.86 N 4949.49 W 5986179.53 N 716402.96 E 0.000 5258.04
12400.00 51.000 265.340 6622.84 6675.59 6475.55 N 5026.95 W 5986170.92 N 716325.72 E 0.000 5335.10
12500.00 51 .000 265.340 6685.77 6738.52 6469.24 N 5104.41 W 5986162.32 N 716248.49 E 0.000 5412.16
12600.00 51.000 265.340 6748.70 6801 .45 6462.92 N 5181.86 W 5986153.72 N 716171.25 E 0.000 5489.22
12689.45 51.000 265.340 6805.00 6857.75 6457.27 N 5251.15W 5986146.03 N 716102.16 E 0.000 5558.16 WS1
12700.00 51.000 265.340 6811.64 6864.39 6456.61 N 5259.32 W 5986145.12 N 716094.01 E 0.000 5566.28
12800.00 51.000 265.340 6874.57 6927.32 6450.29 N 5336.78 W 5986136.52 N 716016.77 E 0.000 5643.35
3 January, 2002 - 16:35
Page 6 of 17
Drí//Quest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for NK-11A WPS
Revised: 3 January, 2002
Alaska Drilling & Wells
North Slope Alaska NIAKUK
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
12900.00 51.000 265.340 6937.50 6990.25 6443.98 N 5414.24 W 0.000 5720.41
13000.00 51.000 265.340 7000.43 7053.18 6437.67 N 5491.69 W 0.000 5797.47
13091.50 51.000 265.340 7058.02 7110.77 6431.89 N 5562.57 W 0.000 5867.98 Begin Dir @ 4.00°/1000 : 13091.50ft
MD, 7110.77ft TVD )
13100.00 51 .340 265.341 7063.34 7116.09 6431.35 N 4.000 5874.54
13200.00 55.340 265.348 7123.04 7175.79 6424.84 N 4.000 5954.07
13300.00 59.340 265.355 7176.99 7229.74 715621.68 E 4.000 6037.54
13355.95 61 .578 265.359 7204.58 7257.33 715573.31 E 4.000 6085.80 End Dir, Start Sail @ 61.58° :
13355.95ftMD,7257.33ftTVD
13400.00 61.578 265.359 7225.54 5820.13 W 5986082.90 N 715534.80 E 0.000 6124.22
13500.00 61.578 265.359 7273.14 5907.79 W 5986073.20 N 715447.39 E 0.000 6211.43
13577.44 61 .578 265.359 7310.00 5975.67 W 5986065.69 N 715379.70 E 0.000 6278.97 CM-3
13600.00 61 .578 265.359 7320.7 5995.44 W 5986063.50 N 715359.98 E 0.000 6298.64
13700.00 61.578 265.359 7368.33 6083.10W 5986053.79 N 715272.57 E 0.000 6385.85
13800.00 61 .578 265.359 7415.93 6170.76 W 5986044.09 N 715185.16 E 0.000 6473.06
13900.00 61 .578 265.359 7463.53 6258.42 W 5986034.39 N 715097.75 E 0.000 6560.27
14000.00 61 .578 265.359 7511.12 6346.08 W 5986024.68 N 715010.34 E 0.000 6647.48
14100.00 61.578 265.359 7558.72 7611.47 6361.14 N 6433.74 W 5986014.98 N 714922.93 E 0.000 6734.69
14200.00 61 .578 265.359 7606.32 7659.07 6354.02 N 6521.39 W 5986005.27 N 714835.52 E 0.000 6821 .90
14300.00 61 .578 265.359 7653.91 7706.66 6346.91 N 6609.05 W 5985995.57 N 714748.11 E 0.000 6909.11
14400.00 61 .578 265.359 7701.51 7754.26 6339.79 N 6696.71 W 5985985.87 N 714660.70 E 0.000 6996.32
14500.00 61 .578 265.359 7749.11 7801.86 6332.67 N 6784.37 W 5985976.16 N 714573.29 E 0.000 7083.53 )
14600.00 61 .578 265.359 7796.70 7849.45 6325.56 N 6872.03 W 5985966.46 N 714485.89 E 0.000 7170.74
14700.00 61.578 265.359 7844.30 7897.05 6318.44 N 6959.68 W 5985956.76 N 714398.48 E 0.000 7257.94
14800.00 61 .578 265.359 7891.89 7944.64 6311.33 N 7047.34 W 5985947.05 N 714311.07 E 0.000 7345.15
14900.00 61 .578 265.359 7939.49 7992.24 6304.21 N 7135.00 W 5985937.35 N 714223.66 E 0.000 7432.36
15000.00 61 .578 265.359 7987.09 8039.84 6297.10 N 7222.66 W 5985927.64 N 714136.25 E 0.000 7519.57
15100.00 61 .578 265.359 8034.68 8087.43 6289.98 N 7310.32 W 5985917.94 N 714048.84 E 0.000 7606.78
15200.00 61 .578 265.359 8082.28 8135.03 6282.86 N 7397.97W 5985908.24 N 713961.43 E 0.000 7693.99
15300.00 61 .578 265.359 8129.88 8182.63 6275.75 N 7485.63 W 5985898.53 N 713874.02 E 0.000 7781.20
15400.00 61 .578 265.359 8177.47 8230.22 6268.63 N 7573.29 W 5985888.83 N 713786.61 E 0.000 7868.41
15500.00 61.578 265.359 8225.07 8277.82 6261.52 N 7660.95 W 5985879.12 N 713699.20 E 0.000 7955.62
3 January, 2002 -16:35
Page 7 of 17
DriffQuest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for NK-11A WPS
Revised: 3 January, 2002
Alaska Drilling & Wells
North Slope Alaska NIAKUK
Measured Sub-Sea Vertical Local Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) e/100ft)
15600.00 61.578 265.359 8272.67 8325.42 6254.40 N 7748.61 W 0.000 8042.83
15655.08 61.578 265.359 8298.88 8351.63 6250.48 N 7796.89 W 0.000 8090.87 Begin Dir @ 4.000/1O0ft : 15655.08ft
MD, 8351.63ft TVD
15700.00 61.517 267.402 8320.29 8373.04 6247.99 N 4.000 8130.11 )
15800.00 61.492 271.953 8368.01 8420.76 6247.49 N 4.000 8217.84
15852.38 61.539 274.336 8393.00 8445.75 6250.02 N 4.000 8263.87 Tuffs
15866.98 61 .560 275.000 8399.95 8452.70 713377.69 E 4.000 8276.70 End Dir, Start Sail @ 61.56° :
15866.98ftMD,8452.70ftTVD
15900.00 61.560 275.000 8415.68 8011.84 W 5985860.83 N 713348.70 E 0.000 8305.71
16000.00 61 .560 275.000 8463.30 8099.43 W 5985865.90 N 713260.92 E 0.000 8393.58
16100.00 61 .560 275.000 8510.93 8187.03W 5985870.98 N 713173.13 E 0.000 8481.44
16200.00 61 .560 275.000 8558.55 8274.63 W 5985876.05 N 713085.34 E 0.000 8569.31
16300.00 61 .560 275.000 8606.1 8362.22 W 5985881.12 N 712997.56 E 0.000 8657.18
16400.00 61.560 275.000 8653.80 8449.82 W 5985886.19 N 712909.77 E 0.000 8745.04
16500.00 61.560 275.000 8701.42 8537.42 W 5985891.26 N 712821.99 E 0.000 8832.91
16600.00 61 .560 275.000 8749.04 8625.01 W 5985896.33 N 712734.20 E 0.000 8920.77
16639.80 61.560 275.000 8768.00 8659.88 W 5985898.35 N 712699.26 E 0.000 8955.75 HRZ
16700.00 61 .560 275.000 8796.67 8849.42 6314.90 N 8712.61 W 5985901.40 N 712646.42 E 0.000 9008.64
16800.00 61.560 275.000 8844.29 8897.04 6322.57 N 8800.21 W 5985906.47 N 712558.63 E 0.000 9096.50
16895.98 61 .560 275.000 8890.00 8942.75 6329.92 N 8884.28 W 5985911.34 N 712474.38 E 0.000 9180.83 Top Kuparuk
NK-11 A Kuparuk Target Geo Poly,
Geological I )
16900.00 61 .560 275.000 8891.92 8944.67 6330.23 N 8887.81 W 5985911.54 N 712470.85 E 0.000 9184.37
16916.97 61.560 275.000 8900.00 8952.75 6331.53 N 8902.68 W 5985912.40 N 712455.95 E 0.000 9199.28
16936.97 61 .560 275.000 8909.52 8962.27 6333.06 N 8920.19W 5985913.42 N 712438.39 E 0.000 9216.86 Begin Dir @ 2.51 °/1 OOft : 16936.97ft
MD, 8962.27ft TVD
17000.00 62.945 275.870 8938.87 8991.62 6338.35 N 8975.72 W 5985917.06 N 712382.73 E 2.514 9272.57
17100.00 65.152 277.207 8982.63 9035.38 6348.60 N 9065.04 W 5985924.66 N 712293.15 E 2.514 9362.29
17200.00 67.371 278.496 9022.88 9075.63 6361.11 N 9155.71 W 5985934.49 N 712202.14 E 2.514 9453.46
17300.00 69.600 279.745 9059.55 9112.30 6375.86 N 9247.56 W 5985946.52 N 712109.90 E 2.514 9545.91
3 January, 2002 - 16:35
Page 8 of 17
DriflQuest 2.00.09.006
Sperry-Sun Drilling Services
ProposalReportforNK-11A WPS
Revised: 3 January, 2002
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings
(ft) (ft) (ft) (ft) (ft)
17400.00 71.838 280.958 9092.57 9145.32 6392.83 N
17500.00 74.083 282.141 9121.88 9174.63 6411.98 N
17600.00 76.334 283.297 9147.40 9200.15 6433.27 N
17700.00 78.591 284.431 9169.11 9221.86 6456.66 N
17730.69 79.285 284.775 9175.00 9227.75 6464.25 N
Global Coordinates
Northings Eastings
(ft) (ft)
Magnetic Declination at Surface is 26.761 ° (03-Jal
All data is in Feet (US) unless otherwise stated. Directions and coo
Vertical depths are relative to Well. Northings and Eas
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azi
Based upon Minimum Curvature type calculations, at a Measured Depth of 17730.69ft.,
The Bottom Hole Displacement is 11616.94ft., in the Direction of 303.811 ° (True).
3 January, 2002 -16:35
Page 9 of 17
Alaska Drilling & Wells
NIAKUK
Dogleg Vertical
Rate Section Comment
(o/1OOft)
2.514 9639.47
2.514 9733.96
2.514 9829.18
2.514 9924.97 )
2.514 9954.45 Total Depth:
17730.69ftMD,9227.75ftTVD
7" Casing
Kuparuk Zone 1 C (TD)
NK-11A BHL Target Geo Poly,
Geological
)
DrillQuest 2.00.09.006
~
~,
H
202452
I DATE I
12/07/01
I CHECK NO. I
00202452
DATE
INVOICE I CREDIT MEMO
DESCRIPTION
GROSS
100.00
VENDOR
DISCOUNT
ALASKAOILA
NET
00
120501 CK120501B
PYMT COMMENTS:
HANDLING INST:
100.00
Permit to Drill ~ee
S/H - Terrie HubJle
X4628
RECEIVED
\\
~~ - \ \
JAN 0 7 2JO;;
Alaska Oil & Gas Cons. Commission
Anchorage
THE ATTACHED CHECK IS IN PAyMeNT FOR ITEMS DESCRIBED ABOVE.
TOTAL ~
100.00
100.00
BP EXPLORATION, (ALASKA) INC.
P.O. BOX 196612
ANCHORAGE, ALASKA 99519.6612
FIRST NATIONAL BANK OF ASHLAND
AN AFFlUATE OF
NATIONAL CITY BANK
CLEVELAND, OHIO
No. H 202452
CONSOLIDATED COMMERCIAL ACCOUNT
56-389
4'12
00202452
PAY
ONE HUNDRED & 00/100************************************* US DOLLAR
DATE
12/07/01
I
NOT VALID AFTER 120 DAYS
Çt~~f1
AMOUNT
$100.0C>
To The
ORDER
Of
ALASKA OIL AND GAS
CONSERVATION COMMISSION
333 WEST 7TH AVENUE
SUITE 100
ANCHORAGE
AK 99501
1112021. 52111 -:01.. 20 :'B~ 51: 0081t1. .~III
~
~
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LEITER/PARAGRAPHS TO
BEINCLUDEDINTRANSNDTTALLETTER
WELL NAME h -//4
CHECK 1
STANDARD LETTER
DEVELOPMENT
DEVELOPM7ENT
REDRILL
EXPLORATION
INJECTION WELL
INJECTION WELL
RED RILL
CHECK WHAT APPLIES
ADD-ONS (OPTIONS)
MULTI LATERAL
(If api number last two (2)
digits are between 60-69)
PILOT HOLE (PH)
ANNUL~ntOSAL
NO
ANNULAR DISPOSAL
<.--> YES
ANNULAR DISPOSAL
THIS WELL
"CLUE"
The permit is for a new wellbore segment of existing weD
--'--' Permit No, . API No. . .
Production should continue to be reported as a function of
the original API number stated above. .
In accordance with 20 AAC 25.005(f), all records, data and
logs acquired for the pilot hole must be clearly
differentiated in both name (name on permit plus PH)
and API number (50 -70/80) from
records, data and logs acquired for well (name on permit).
Annular disposal has not been requested. . .
Annular Disposal of drilling wastes will not be approved. . .
Annular Disposal of drilling wastes will not be approved. . .
DISPOSAL INTO OTHER Please note that an disposal of fluids generated.. .
ANNULUS
<.--> YES +
SPACING EXCEPTION
Templates are located m drive\jody\tempiates
Enclosed is the approved application for permit to drill the
above referenced well. The permit is approved,sùbject to
full compliance with 20 AAC 25.055. Approval to perforate
and produce is contingent upon issuance of a conservation
order approving a spacing exception.
(Company Name) will assume the liability of any protest to
the spacing exception that may occur.
, , flfJ¿(
, WELL PERMIT CHECK~IST, ,;;OMPANY 6/ x: WELL NAME d;<-/¡ A PROGRAM: exp - d~v ~ redr11 ~ serv - we,lIbore seg _ann. disposal para re, q -
FIELD & POOL &:/ Vf)/ '18 INIT CLASS ~ ¡/ / 01'- GEOL AREA ~90 UNIT# all h57) ON/OFF SHORE C:;.¡;.¡:- #<
ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . 'f).i' . .. . . . . . . N /) / J ,... " / 1/
2. Le~se numberappropriate.~. ~.cu:M,.Æ~ (~--.t/.ð! N.¡( -;I/¿4.ld fé/al I~ ~P.cr-yL p---r ?U'-.jIJ'Li'-h~ iAA...... C-Vn-€"'Þ1r- r-&¿3r.-;;ltfz&7t~ ~
3.Umquewellnameandnumber.................. N ' -L'
4. Welliocatedinadefinedpool................. . ,N ~'¥ .;:)¿.;r~C?Þo:f-h~ ~ Þæ ~ ¿J~¿'¿ tÀ<-þi./qj u.... /tZ>L-
5. Well located proper distance from drilling unit boundary. . . . N 03'-/630 j -r::z::>~ ~ /7D'2:. ~<T'6 2-7'. .&>
6. Well located proper distance from other wells.. . . . . . . . . N
7. Sufficientacreageavailable'indrillingunit............ N
8. If deviated, is wellbóre plat induded.. . . . . . . . . . . . . . N
9. Operator only affected party.. . . . . . . . . . . . . . . . . . N
10. Operator has appropriate bond in force. . . . . . . . . . . . . N
11. Permit can be issued without conservation order. . . . . . . . , N
APPR Q~~ 12. Permit ca~.be issued without administrativ? approval.. . . . . ' N
,)Þ I'C¡' 13. Canpermitbeapprovedbefore15-daywalt........... N
14. Conductor string provided .. . . . . . . .. . . . . . . . . . Y N N/A
15. Suñace casing protects all known USDWs. . .. . . . . . . . ,A)fÍ --¥-N- £¿ -.11"-;/1
16. CMT vol adequate to circulate on conductor & suñ csg. . . . . Y N N/A '
17. CMT vol adequate to tie-in long string to suñ csg. . . . . . . . iN I-YA ~" .J-
18. CM: will co~er all known productive horizons. . . . . '. . . . . ' N ^, r~-ß IL#JU eU . ~--,,-,{\ .
19. Casing desIgns adequate for C, T, B & permafrost. . . . . . . ' N D
20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . N tJl.-\t,~! '\Ì.
21. If a re-drill, has a 10-403 for abandonment been approved. . . Y N N!N) I t..! '(if
22. Adequate well bore separation proposed.. . . . . . . . . . . . @ N
23. If diverter required, does it meet regulations. . . . . . . . . . iNN/A
24. Drilling ,fluid program schematic & equip list adequate. . . . . N
25.BOPEs,dotheymeetregulation................ Nj)-Iq .', r '^
APl'f< l"lE ,26, BOPE....~ -. .p~ate; lest to '~o 0 ps;., N ¡.It ~p > '?, (" 5 I' '" ) /"'4 <y? f ~ Uvtt"'-
WGA q9{1J'l- 27. Chokemanifoldcompltesw/APIRP-53(May84}........ . NP-I't
28. Work will occur without operation shutdbwn. . . . . . . . . . . N .
29. Is presence of H25 gas probable.. . . . . . . . . . . . . . . . Y ŒV ..
GEOLOGY, 30. Permit can be issued wlo hydrogen sulfide measures. . . .. Y W 7"k(¡~I!:..I'7+~dl./c¿rs 4:-1 7::b, ¡..~~ ~a:'-'~(..)I"-€.-d 2ð - 39 fIf/J'L 1I~'.4t
31. Data presented on potential overpressure zones . . . . . .. . ~. y £¡(feJ2~ ~Vð";- ¡pre..6SUré- Ù &,"7 ~ ¿/>1l{j.
32. Seismic analysis of shallow gas zones. . . . . . . . . . . .. y ~ ~ (/-
APPR DATE 33. Seabed condition survey ("If off-shore). . . . . . . . . ,:"'::2: pJ Y N .
~ /, ¡f f {) Z-- 34. Contact name/phone for weekly progress reports [exp/~ry only] Y N
ANNULAR DlSPOSAL35. With proper cementing records, this plan.
(A) will contain waste in a suitable receiving zone; . . . . . . .
(B) will not contaminate freshwater. or cause drilling waste. ..
to surface;.. '
(C) will not impair mechanical integrity pf the well used for disposal; Y N
(D) will not damage producing formation or impair recovery from a Y N
pool; and
,(E) will not drcumvent 20 MC 25.252 or 20 MC 25.412. Y N
GEOLOGY: ENGINEERING:. UIC/Annular COMMISSION:
~~~ I" v" WM'j~oJ)f.~?<1<;/I6fóL--
. ENGINEERING
APPR DATE
\tJ6k \ h { 2'-"
Y N
Y N
~ Ú1-\.YlIA,[Ouv J,¿~flJÇ,t:L l
Com m e ntsllnstructions:
c:\msoffice\wordian\diana\checklist (rev. 11/01/100)
c
0
Z
0
-4
:E
::0
)
-4
m
Z
-4
:J:
-
en
>
::0
m
»
)
,-."
~
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, infonnation of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
~.
Sperry-Sun Drilling Services
LIS Scan utility
$Revision: 3 $
LisLib $Revision: 4 $
Wed Nov 06 14:26:22 2002
Reel Header
Service name.............LISTPE
Date.....................02/11/06
Origin...................STS
Reel Name................UNKNOWN
Continuation Number..... .01
Previous Reel Name...... . UNKNOWN
Comments........ ........ .STS LIS
Tape Header
Service name..... ....,.. .LISTPE
Date.....................02/11/06
Origin...................STS
Tape Name................UNKNOWN
Continuation Number... ...01
Previous Tape Name...... . UNKNOWN
Comments........ """" .STS LIS
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay Unit - Niakuk
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 2
AK-MW-22005
B. HENNINGSE
L. VAUGHN
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 6
AK-MW-22005
C.A. DEMOSKI
L. VAUGHN
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 8
AK-MW-22005
C.A. DEMOSKI
A. MADSEN
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
MSL 0)
#
WELL CASING RECORD
Writing Library.
Writing Library.
NK-llAPB1
500292278973
BP Exploration
Sperry Sun
24-0CT-02
MWD RUN 4
AK-MW-22005
B. HENNINGSE
L. VAUGHN
MWD RUN 7
AK-MW-22005
C.A. DEMOSKI
A. MADSEN
36
12N
15E
1312
1021
.00
53.85
21.74
~
Scientific Technical Services
Scientific Technical Services
(Alaska), Inc.
MWD RUN 5
AK-MW-22005
C.A. DEMOSKI
L. VAUGHN
MAD RUN 7
AK-MW-22005
C.A. DEMOSKI
A. MADSEN
1ST STRING
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
9.625 10699.0
¿;¿~- bO;)
I 1 ~5 i
~.
~,
2ND STRING
3RD STRING
PRODUCTION STRING
#
REMARKS:
O. THIS FILE REPLACES PREVIOUS LDWG TRANSMITTAL.
CHANGED API EXTENSION.
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
STATED.
2. MWD RUN 1 & 3 ARE DIRECTIONAL ONLY TO SET WHIPSTOCK
AND MILL CASING AND ARE
NOT PRESENTED.
3. MWD RUNS 2 & 4 ARE DIRECTIONAL WITH DUAL GAMMA RAY
(DGR) UTILIZING GEIGER
MUELLER TUBE DETECTORS.
4. MWD RUNS 5 - 8 ARE DIRECTIONAL WITH DUAL GAMMA RAY
(DGR) UTILIZING GEIGER
MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE
RESISTIVITY PHASE 4
(EWR4), COMPENSATED NEUTRON POROSITY (CNP), AND
STABILIZED LITH-DENSITY (SLD).
5. MWD,RUN 2 WAS USED TO TIE-IN GAMMA
SET BRIDGE PLUG.
NO FOOTAGE DRILLED ON THIS RUN.
PRESENTED FOR THIS
RUN FROM 10634' MD, 5735' TVD TO
TVD.
RAY TO NK-ll AND
GAMMA RAY ONLY IS
10699' MD, 5755'
6. GAMMA RAY (SGRC) IS LOGGED BEHIND CASING FROM 10634'
MD, 5735' TVD TO
10699' MD, 5755' TVD.
7. A MADPASS WAS PERFORMED WHILE PULLING OUT OF THE
HOLE AFTER DRILLING
MWD RUN 7 AND IS PRESENTED AS A TAIL TO THIS LOG.
8. DEPTH SHIFTING / CORRECTION OF MWD DATA IS WAIVED
PER THE EMAIL
MESSAGE FROM D. SCHNORR OF 02/19/02. MWD DATA
CONSIDERED PDC.
THIS WELL KICKS OFF FROM NK-11 AT 10699' MD, 5755'
TVD (TOP OF WHIPSTOCK).
ALL MWD LOG AND HEADER DATA RETAINS THE ORIGINAL
DRILLER'S
DEPTH REFERENCES.
9. MWD RUNS 1 - 8 REPRESENT WELL NK-11APB1 WITH API #
50-029-22789-73.
THIS WELL REACHED A TOTAL DEPTH OF 17535' MD, 9169'
TVD.
SROP = SMOOTHED RATE OF PENETRATION
SGRC = SMOOTHED GAMMA RAY COMBINED
SEXP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
EXTRA SHALLOW SPACING)
SESP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
SHALLOW SPACING)
SEMP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
MEDIUM SPACING)
SEDP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
DEEP SPACING)
SFXE = SMOOTHED
SBD2 = SMOOTHED
SC02 = SMOOTHED
BIN)
SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR
FORMATION EXPOSURE TIME
BULK DENSITY (LOW-COUNT BIN)
STANDOFF CORRECTION (LOW-COUNT
(LOW-COUNT BIN)
SPSF = SMOOTHED COMPENSATED NEUTRON POROSITY
(SANDSTONE MATRIX, FIXED HOLE SIZE)
~
~
SNNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT
RATE
SNFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT
RATE
CURVES WITH THE EXTENSION "M" ARE MEASURED AFTER
DRILLING (MAD)
ENVIRONMENTAL PARAMETERS USED IN PROCESSING THE
NEUTRON LOG DATA:
HOLE SIZE:
8.5"
MUD WEIGHT:
10.9 PPG
MUD FILTRATE SALINITY:
PPM CHLORIDES
FORMATION WATER SALINITY:
FLUID DENSITY:
GICC
MATRIX DENSITY:
GICC
LITHOLOGY:
SANDSTONE
$
File Header
Service name.............STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation..... ..02/11/06
Maximum Physical Record..65535
File Type................LO
Previous File Name...... .STSLIB.OOO
Conunent Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
NCNT
FCNT
NPHI
DRHO
RHOB
PEF
RPD
FET
RPM
RPS
RPX
$
1
9.4 -
1,650 - 19,500
15,000 PPM CHLORIDES
1. 00
2.65
clipped curves; all bit runs merged.
.5000
START DEPTH
10634.0
10735.0
11853.5
11853.5
11853.5
11862.5
11862.5
11862.5
11888.5
11888.5
11888.5
11888.5
11888.5
STOP DEPTH
17494.5
17535.0
17451.0
17451.0
17451.0
17460.0
17460.0
17460.0
17487.0
17487.0
17487.0
17487.0
17487.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE
MWD 2 10634.0 10699.0
MWD 4 10699.5 11957.0
MWD 5 11957.5 17102.0
MWD 6 17102.5 17335.0
MWD 7 17335.5 17338.0
MWD 8 17338.5 17535.0
$
#
REMARKS: MERGED MAIN PASS.
$
.~.
~
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type. ....0
Logging Direction.. .......... .... . Down
Optical log depth units....... ....Feet
Data Reference Point. .......... ...Undefined
Frame Spacing........... ....... ...60 .lIN
Max frames per record. .......... ..Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HR 4 1 68 28 8
NPHI MWD PU-S 4 1 68 32 9
FCNT MWD CP30 4 1 68 36 10
NCNT MWD CP30 4 1 68 40 11
RHOB MWD G/CM 4 1 68 44 12
DRHO MWD G/CM 4 1 68 48 13
PEF MWD B/E 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10634 17535 14084.5 13803 10634 17535
ROP MWD FT/H 0.46 1219.38 158.668 13601 10735 17535
GR MWD API 13.1 365.31 110.213 13722 10634 17494.5
RPX MWD OHMM 1. 05 1324.67 9.44859 11198 11888.5 17487
RPS MWD OHMM 1. 04 2000 27.9491 11198 11888.5 17487
RPM MWD OHMM 1. 03 2000 25.8304 11198 11888.5 17487
RPD MWD OHMM 1. 04 2000 49.4582 11198 11888.5 17487
FET MWD HR 0.17 98.31 3.19117 11198 11888.5 17487
NPHI MWD PU-S 5.4 81.76 39.4887 11196 11853.5 17451
FCNT MWD CP30 489.43 2173.75 700.803 11196 11853.5 17451
NCNT MWD CP30 2161.1 4840.17 2845.76 11196 11853.5 17451
RHOB MWD G/CM 2.07 3.3 2.45062 11196 11862.5 17460
DRHO MWD G/CM -0.12 0.97 0.0658369 11196 11862.5 17460
PEF MWD B/E 1. 52 15.36 3.49962 11196 11862.5 17460
First Reading For Entire File......... .10634
Last Reading For Entire File...........17535
File Trailer
Service name............ .STSLIB.OOI
Service Sub Level Name...
Version Number...........l.0.0
Date of Generation.......02/11/06
Maximum Physical Record. .65535
File Type................LO
Next File Name.......... .STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.. .....,.. .1.0.0
Date of Generation...... .02/11/06
Maximum Physical Record..65535
File Type................LO
Previous File Name...... .STSLIB.OOI
Comment Record
~.
FILE HEADER
FILE NUMBER:
EDITED MERGED MAD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
NPHI
FCNT
NCNT
RHOB
DRHO
PEF
RPM
RPS
RPD
FET
RPX
GR
RAT
$
2
~
clipped curves; all MAD runs merged using earliest passes.
.5000
START DEPTH
16946.5
16946.5
16946.5
16955.5
16955.5
16955.5
16982.0
16982.0
16982.0
16982.0
16982.0
16989.0
17030.5
#
MERGED
PBU
MWD
$
DATA SOURCE
TOOL CODE
MAD RUN NO. MAD PASS NO.
7 1
MERGE TOP
16946.5
MERGE BASE
17342.5
#
REMARKS:
MERGED MAD PASS.
$
STOP DEPTH
17258.5
17258.5
17258.5
17267.0
17267.0
172 67.0
17294.0
17294.0
17294.0
17294.0
17294.0
17302.0
17342.5
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction............... ..Down
Optical log depth units. ......... .Feet
Data Reference Point..... ........ .Undefined
Frame Spacing.....................60 .lIN
Max frames per record.............Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
RAT MAD FT/H 4 1 68 4 2
GR MAD API 4 1 68 8 3
RPX MAD OHMM 4 1 68 12 4
RPS MAD OHMM 4 1 68 16 5
RPM MAD OHMM 4 1 68 20 6
RPD MAD OHMM 4 1 68 24 7
FET MAD HR 4 1 68 28 8
NPHI MAD PU-S 4 1 68 32 9
FCNT MAD CP30 4 1 68 36 10
NCNT MAD CP30 4 1 68 40 11
RHOB MAD G/CM 4 1 68 44 12
DRHO MAD G/CM 4 1 68 48 13
PEF MAD B/E 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 16946.5 17342.5 17144.5 793 16946.5 17342.5
RAT MAD FT/H 1.25 164. 62 95.5657 625 17030.5 17342.5
GR MAD API 27.55 219.51 53.6267 627 16989 17302
RPX MAD OHMM 1.19 61.47 25.5667 625 16982 17294
RPS MAD OHMM 1.13 98.14 32. 618 625 16982 17294
RPM MAD OHMM 1. 28 89.19 35.1661 625 16982 17294
RPD MAD OHMM 1. 77 133.91 48.1591 625 16982 17294
FET MAD HR 37.7 103.21 68.4103 625 16982 17294
NPHI MAD PU-S 9.7 72.39 21.1368 625 16946.5 17258.5
FCNT MAD CP30 577.95 1493.11 987.867 625 16946.5 17258.5
NCNT MAD CP30 2284.28 4316.29 3470.56 625 16946.5 17258.5
RHOB MAD G/CM 2.25 2.89 2.49338 624 16955.5 17267
DRHO MAD G/CM -0.02 0.3 0.0441346 624 16955.5 17267
.~
PEF
B/E
10.22
MAD
1. 83
First Reading For Entire File.. ....... .16946.5
Last Reading For Entire File.......... .17342.5
File Trailer
Service name.............STSLIB.002
Service Sub Level Name...
Version Number..... ..... .1.0.0
Date of Generation...... .02/11/06
Maximum Physical Record. .65535
File Type................LO
Next File Name......... ..STSLIB.003
Physical EOF
File Header
Service name..... ....... .STSLIB.003
Service Sub Level Name...
Version Number... ....... .1.0.0
Date of Generation...... .02/11/06
Maximum Physical Record. .65535
File Type........... .....LO
Previous File Name..... ..STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
$
3
~
4.89426
624
16955.5
header data for each bit run in separate files.
2
.5000
START DEPTH
10634.0
STOP DEPTH
10699.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
19-JAN-02
Insite 4.05.5
66.16
Memory
10728.0
74.6
74.8
TOOL NUMBER
PB02394HG6
8.500
LSND
9.40
56.0
9.5
2300
. a
.000 .0
.000 95.0
.000 .0
172 67
~
MUD CAKE AT MT:
.000
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type. ....0
Logging Direction.. ........... ....Down
Optical log depth units...........Feet
Data Reference Point............. .Undefined
Frame Spacing..... ............... .60 .lIN
Max frames per record.............Undefined
Absent value......................-999
Depth units.......................
Datum Specification Block sub-type. ..0
Name Service Order
DEPT
GR MWD020
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
API 4 1 68 4 2
Name Service unit
DEPT FT
GR MWD020 API
Min
10634
23.45
Max
10699
68.07
Mean Nsam
10666.5 131
39.4395 131
First Reading For Entire File...... ....10634
Last Reading For Entire File...........l0699
File Trailer
Service name.............STSLIB.003
Service Sub Level Name...
Version Number....... ... .1.0.0
Date of Generation. ..... .02/11/06
Maximum Physical Record..65535
File Type................LO
Next File Name....... ... .STSLIB.004
Physical EOF
File Header
Service name...... ...... .STSLIB.004
Service Sub Level Name...
Version Number..... ..... .1.0.0
Date of Generation. ..... .02/11/06
Maximum Physical Record. .65535
File Type................LO
Previous File Name. ..... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
4
header data for each bit run in separate files.
4
.5000
START DEPTH
10699.5
10735.0
STOP DEPTH
11915.5
11957.0
~,
.0
First
Reading
10634
10634
Last
Reading
10699
10699
.~
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point........ ..... .Undefined
Frame Spacing...... .............. .60 .lIN
Max frames per record.............Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
~
22-JAN-02
Insite 4.05.5
66.16
Memory
11957.0
50.3
72.4
TOOL NUMBER
PB02394HG6
8.500
LSND
9.30
55.0
9.5
1850
5.8
.000
.000
.000
.000
.0
102.2
.0
.0
Name Service Order
DEPT
ROP MWD040
GR MWD040
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
API 4 1 68 8 3
First Last
Name Service unit Min Max Mean Nsam Reading Reading
DEPT FT 10699.5 11957 11328.3 2516 10699.5 11957
ROP MWD040 FT/H 2.13 445.93 146.412 2445 10735 11957
GR MWD040 API 26.32 122.79 73.257 2433 10699.5 11915.5
First Reading For Entire File....... ...10699.5
Last Reading For Entire File.......... .11957
~
File Trailer
Service name. ........... .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/11/06
Maximum Physical Record..65535
File Type................LO
Next File Name...........STSLIB.005
Physical EOF
File Header
Service name.............STSLIB.005
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation...... .02/11/06
Maximum Physical Record..65535
File Type................LO
Previous File Name...... .STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
FCNT
NPHI
NCNT
RHOB
DRHO
PEF
FET
RPD
RPM
RPS
RPX
GR
ROP
$
5
~
header data for each bit run in separate files.
5
.5000
START DEPTH
11853.5
11853.5
11853.5
11862.5
11862.5
11862.5
11888.5
11888.5
11888.5
11888.5
11888.5
11916.0
11957.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
CNP
SLD
EWR4
DGR
$
#
STOP DEPTH
16996.5
16996.5
16996.5
17006.0
17006.0
17006.0
17032.5
17032.5
17032.5
17032.5
17032.5
17040.5
17102.0
BOTTOM)
TOOL TYPE
COMPENSATED NEUTRON
STABILIZED LITHO DEN
ELECTROMAG. RESIS. 4
DUAL GAMMA RAY
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
27-JAN-02
Insite 4.05.5
66.16
Memory
17102.0
49.0
66.6
TOOL NUMBER
PB02431NL6
PB02431NL6
PB02395HWRGV6
PB02395HWRGV6
8.500
~,
~
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
GEM
10.90
42.0
8.9
19500
2.9
.125
.066
.220
.360
75.0
149.0
75.0
75.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type. ............. ....0
Data Specification Block Type. ....0
Logging Direction.................Down
Optical log depth units...... .... .Feet
Data Reference Point.......... ... .Undefined
Frame Spacing...... .............. .60 .1IN
Max frames per record.............Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD050 FT/H 4 1 68 4 2
GR MWD050 API 4 1 68 8 3
RPX MWD050 OHMM 4 1 68 12 4
RPS MWD050 OHMM 4 1 68 16 5
RPM MWD050 OHMM 4 1 68 20 6
RPD MWD050 OHMM 4 1 68 24 7
FET MWD050 HR 4 1 68 28 8
NPHI MWD050 PU-S 4 1 68 32 9
FCNT MWD050 CP30 4 1 68 36 10
NCNT MWD050 CP30 4 1 68 40 11
RHOB MWD050 G/CM 4 1 68 44 12
DRHO MWD050 G/CM 4 1 68 48 13
PEF MWD050 B/E 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 11853.5 17102 14477.8 10498 11853.5 17102
ROP MWD050 FT/H 0.46 1219.38 173.319 10290 11957.5 17102
GR MWD050 API 23.64 365.31 125.688 10250 11916 17040.5
RPX MWD050 OHMM 1. 05 46.41 5.22337 10289 11888.5 17032.5
RPS MWD050 OHMM 1. 04 69.13 5.64409 10289 11888.5 17032.5
RPM MWD050 OHMM 1. 03 1709.35 6.35886 10289 11888.5 17032.5
RPD MWD050 OHMM 1. 04 1910.48 7.46379 10289 11888.5 17032.5
FET MWD050 HR 0.17 23.94 1. 63962 10289 11888.5 17032.5
NPHI MWD050 PU-S 20.71 81.76 41.4964 10287 11853.5 16996.5
FCNT MWD050 CP30 508.91 959 660.714 10287 11853.5 16996.5
NCNT MWD050 CP30 2161.1 3530.23 2763.54 10287 11853.5 16996.5
RHOB MWD050 G/CM 2.07 3.3 2.4437 10288 11862.5 17006
DRHO MWD050 G/CM -0.12 0.97 0.065832 10288 11862.5 17006
PEF MWD050 B/E 1. 52 15.36 3.38242 10288 11862.5 17006
First Reading For Entire File.. ....... .11853.5
Last Reading For Entire File.... ...... .17102
File Trailer
r---
Service name.............STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/11/06
Maximum Physical Record..65535
File Type................LO
Next File Name...........STSLIB.006
Physical EOF
File Header
Service name.............STSLIB.006
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/11/06
Maximum Physical Record..65535
File Type................LO
Previous File Name...... .STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
NPHI
FCNT
NCNT
DRHO
RHOB
PEF
RPX
RPM
FET
RPS
RPD
GR
ROP
$
6
~
header data for each bit run in separate files.
6
.5000
START DEPTH
16997.0
16997.0
16997.0
17006.5
17006.5
17006.5
17033.0
17033.0
17033.0
17033.0
17033.0
17041.0
17102.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
CNP
SLD
EWR4
DGR
$
#
STOP DEPTH
17244.0
17244.0
17244.0
17253.5
17253.5
17253.5
17280.0
17280.0
17280.0
17280.0
17280.0
17287.5
17335.0
BOTTOM)
TOOL TYPE
COMPENSATED NEUTRON
STABILIZED LITHO DEN
ELECTROMAG. RESIS. 4
DUAL GAMMA RAY
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
*
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
30-JAN-02
Insite 4.05.5
66.16
Memory
17335.0
64.8
67.4
TOOL NUMBER
PB02431NL6
PB02431NL6
PB02395HWRGV6
PB02395HWRGV6
8.500
GEM
10.90
43.0
~
~
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
9.2
19500
2.8
.260
.164
.210
.470
88.0
143.6
88.0
88.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction...... ......... ..Down
Optical log depth units........ ...Feet
Data Reference Point............. . Undefined
Frame Spacing.....................60 .lIN
Max frames per record........ .... .Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD060 FT/H 4 1 68 4 2
GR MWD060 API 4 1 68 8 3
RPX MWD060 OHMM 4 1 68 12 4
RPS MWD060 OHMM 4 1 68 16 5
RPM MWD060 OHMM 4 1 68 20 6
RPD MWD060 OHMM 4 1 68 24 7
FET MWD060 HR 4 1 68 28 8
NPHI MWD060 PU-S 4 1 68 32 9
FCNT MWD060 CP30 4 1 68 36 10
NCNT MWD060 CP30 4 1 68 40 11
RHOB MWD060 G/CM 4 1 68 44 12
DRHO MWD060 G/CM 4 1 68 48 13
PEF MWD060 B/E 4 1 68 52 14
First Last
Name Service unit Min Max Mean Nsam Reading Reading
DEPT FT 16997 17335 17166 677 16997 17335
ROP MWD060 FT/H 1. 93 94.64 16.7045 466 17102.5 17335
GR MWD060 API 30.69 87.97 52.2337 494 17041 17287.5
RPX MWD060 OHMM 6.83 54.99 27.3052 495 17033 17280
RPS MWD060 OHMM 9.27 91.05 35.4556 495 17033 17280
RPM MWD060 OHMM 12.45 90.01 38.2289 495 17033 17280
RPD MWD060 OHMM 14.37 132.17 52.7169 495 17033 17280
FET MWD060 HR 3.49 47.31 16.1406 495 17033 17280
NPHI MWD060 PU-S 9.17 31.74 16.435 495 16997 17244
FCNT MWD060 CP30 664.08 1507.15 1059.03 495 16997 17244
NCNT MWD060 CP30 2698.42 4381.63 3724.97 495 16997 17244
RHOB MWD060 G/CM 2.24 2.66 2.49317 495 17006.5 17253.5
DRHO MWD060 G/CM -0.09 0.33 0.0611919 495 17006.5 17253.5
PEF MWD060 B/E 2.06 8.07 4.09026 495 17006.5 17253.5
First Reading For Entire File....... ...16997
Last Reading For Entire Fi1e...........17335
File Trailer
Service name.... ........ .STSLIB.006
Service Sub Level Name...
Version Number...... .... .1.0.0
--.,
Date of Generation.... ...02/11/06
Maximum Physical Record..65535
File Type............ ....LO
Next File Name.......... .STSLIB.007
Physical EOF
File Header
Service name........ .....STSLIB.007
Service Sub Level Name...
Version Number...... .... .1.0.0
Date of Generation.. .... .02/11/06
Maximum Physical Record. .65535
File Type................LO
Previous File Name...... .STSLIB.006
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
NCNT
FCNT
NPHI
RHOB
DRHO
PEF
FET
RPX
RPS
RPM
RPD
GR
ROP
$
7
~
header data for each bit run in separate files.
7
.5000
START DEPTH
17244.5
17244.5
17244.5
17254.0
17254.0
17254.0
17280.5
17280.5
17280.5
17280.5
17280.5
17288.0
17335.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
CNP
SLD
EWR4
DGR
$
#
STOP DEPTH
17254.5
17254.5
17254.5
17263.5
17263.5
17263.5
17289.5
17289.5
17289.5
17289.5
17289.5
17297.5
17338.0
31-JAN-02
Insite 4.05.5
66.16
Memory
17338.0
65.5
67.4
BOTTOM)
TOOL TYPE
COMPENSATED NEUTRON
STABILIZED LITHO DEN
ELECTROMAG. RESIS. 4
DUAL GAMMA RAY
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
TOOL NUMBER
PB02431NL6
PB02431NL6
PB02395HWRGV6
PB02395HWRGV6
8.500
GEM
10.90
43.0
9.2
18500
3.0
,r---,
~
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
.270
.186
.220
.480
87.0
129.2
87.0
87.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units..... ..... .Feet
Data Reference Point....... ...... . Undefined
Frame Spacing.....................60 .lIN
Max frames per record.............Undefined
Absent value......................-999
Depth units.......................
Datum Specification Block sub-type...O
Name Service Order units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD070 FT/H 4 1 68 4 2
GR MWD070 API 4 1 68 8 3
RPX MWD070 OHMM 4 1 68 12 4
RPS MWD070 OHMM 4 1 68 16 5
RPM MWD070 OHMM 4 1 68 20 6
RPD MWD070 OHMM 4 1 68 24 7
FET MWD070 HR 4 1 68 28 8
NPHI MWD070 PU-S 4 1 68 32 9
FCNT MWD070 CP30 4 1 68 36 10
NCNT MWD070 CP30 4 1 68 40 11
RHOB MWD070 G/CM 4 1 68 44 12
DRHO MWD070 G/CM 4 1 68 48 13
PEF MWD070 B/E 4 1 68 52 14
First Last
Name Service unit Min Max Mean Nsam Reading Reading
DEPT FT 17244.5 17338 17291.3 188 17244.5 17338
ROP MWD070 FT/H 4.68 41. 23 29.505 6 17335.5 17338
GR MWD070 API 51.65 59.51 54.7055 20 17288 17297.5
RPX MWD070 OHMM 24.13 32.09 27.5384 19 17280.5 17289.5
RPS MWD070 OHMM 29.24 38.17 33.8184 19 17280.5 17289.5
RPM MWD070 OHMM 31. 59 39.84 35.6911 19 17280.5 17289.5
RPD MWD070 OHMM 39.58 46.07 42.9768 19 17280.5 17289.5
FET MWD070 HR 34.66 36.89 35.0268 19 17280.5 17289.5
NPHI MWD070 PU-S 18.225 21.14 20.1929 21 17244.5 17254.5
FCNT MWD070 CP30 835.93 972.79 867.288 21 17244.5 17254.5
NCNT MWD070 CP30 3392.82 3726.06 3462.57 21 17244.5 17254.5
RHOB MWD070 G/CM 2.41 2.48 2.4495 20 17254 172 63.5
DRHO MWD070 G/CM -0.03 0.07 -0.0115 20 17254 172 63.5
PEF MWD070 B/E 2.01 3.47 2.53075 20 17254 17263.5
First Reading For Entire File........ ..17244.5
Last Reading For Entire File...........17338
File Trailer
Service name............ .STSLIB.007
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation... ... .02/11/06
Maximum Physical Record..65535
File Type................LO
,,--....,
Next File Name.. ........ .STSLIB.008
Physical EOF
File Header
Service name........... ..STSLIB.008
Service Sub Level Name...
Version Number..... ..... .1.0.0
Date of Generation...... .02/11/06
Maximum Physical Record..65535
File Type................LO
Previous File Name.......STSLIB.007
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
NPHI
FCNT
NCNT
RHOB
DRHO
PEF
RPM
RPS
RPD
FET
RPX
GR
ROP
$
8
~
header data for each bit run in separate files.
8
.5000
START DEPTH
17255.0
17255.0
17255.0
17264.0
17264.0
17264.0
17290.0
17290.0
17290.0
17290.0
17290.0
17298.0
17338.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
17451.0
17451.0
17451.0
17460.0
17460.0
17460.0
17487.0
17487.0
17487.0
17487.0'
17487.0
17494.5
17535.0
TOOL STRING (TOP TO
VENDOR TOOL CODE
CNP
SLD
EWR4
DGR
$
BOTTOM)
TOOL TYPE
COMPENSATED NEUTRON
STABILIZED LITHO DEN
ELECTROMAG. RESIS. 4
DUAL GAMMA RAY
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
03-FEB-02
Insite 4.05.5
66.16
Memory
17535.0
67.9
69.0
TOOL NUMBER
PB02431NL6
PB02431NL6
PB02395HWRGV6
PB02395HWRGV6
8.500
GEM
10.90
47.0
9.1
18000
3.3
.190
.105
82.0
154.0
~
/~
MUD FILTRATE AT MT:
MUD CAKE AT MT:
.320
.420
82.0
82.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type............ ......0
Data Specification Block Type.....O
Logging Direction.......... ...... . Down
Optical log depth units.. ........ .Feet
Data Reference Point..... ......., . Undefined
Frame Spacing............ ........ .60 .lIN
Max frames per record.... ........ . Undefined
Absent value......................-999
Depth units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD080 FT/H 4 1 68 4 2
GR MWD080 API 4 1 68 8 3
RPX MWD080 OHMM 4 1 68 12 4
RPS MWD080 OHMM 4 1 68 16 5
RPM MWD080 OHMM 4 1 68 20 6
RPD MWD080 OHMM 4 1 68 24 7
FET MWD080 HR 4 1 68 28 8
NPHI MWD080 PU-S 4 1 68 32 9
FCNT MWD080 CP30 4 1 68 36 10
NCNT MWD080 CP30 4 1 68 40 11
RHOB MWD080 G/CM 4 1 68 44 12
DRHO MWD080 G/CM 4 1 68 48 13
PEF MWD080 B/E 4 1 68 52 14
First Last
Name Service unit Min Max Mean Nsam Reading Reading
DEPT FT 17255 17535 17395 561 17255 17535
ROP MWD080 FT/H 2.46 142.95 21.9386 394 17338.5 17535
GR MWD080 API 13.1 104.29 34.8847 394 17298 17494.5
RPX MWD080 OHMM 1. 73 1324.67 96.2602 395 17290 17487
RPS MWD080 OHMM 4.04 2000 599.264 395 17290 17487
RPM MWD080 OHMM 6.88 2000 517.016 395 17290 17487
RPD MWD080 OHMM 10.44 2000 1139.56 395 17290 17487
FET MWD080 HR 1. 93 98.31 25.8471 395 17290 17487
NPHI MWD080 PU-S 5.4 65.56 17.0041 393 17255 17451
FCNT MWD080 CP30 489.43 2173.75 1290.06 393 17255 17451
NCNT MWD080 CP30 2314.99 4840.17 3857.47 393 17255 17451
RHOB MWD080 G/CM 2.27 2.72 2.57812 393 17264 17460
DRHO MWD080 G/CM -0.03 0.36 0.0757506 393 172 64 17460
PEF MWD080 B/E 2.21 11. 57 5.87285 393 17264 17460
First Reading For Entire File....... ...17255
Last Reading For Entire File...........17535
File Trailer
Service name.............STSLIB.008
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation. .,... .02/11/06
Maximum Physical Record..65535
File Type........... .....LO
Next File Name......... ..STSLIB.009
~
Physical EOF
File Header
Service name............ .STSLIB.009
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation.......02/11/06
Maximum Physical Record. .65535
File Type............ ... .LO
Previous File Name... ....STSLIB.008
Comment Record
FILE HEADER
FILE NUMBER:
RAW MAD
Curves and log
DEPTH INCREMENT:
MAD RUN NUMBER:
MAD PASS NUMBER:
#
FILE SUMMARY
VENDOR TOOL CODE
NCNT
FCNT
NPHI
RHOB
DRHO
PEF
RPX
RPS
RPM
RPD
FET
GR
RAT
$
9
~
header data for each pass of each run in separate files.
.5000
7
1
START DEPTH
16946.5
16946.5
16946.5
16955.5
16955.5
16955.5
16982.0
16982.0
16982.0
16982.0
16982.0
16989.0
17030.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
17258.5
17258.5
17258.5
17267.0
17267.0
172 67.0
17294.0
17294.0
17294.0
17294.0
17294.0
17302.0
17342.5
TOOL STRING (TOP TO
VENDOR TOOL CODE
CNP
SLD
EWR4
DGR
$
BOTTOM)
TOOL TYPE
COMPENSATED NEUTRON
STABILIZED LITHO DEN
ELECTROMAG. RESIS. 4
DUAL GAMMA RAY
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
31-JAN-02
Insite 4.05.5
66.16
Memory
17338.0
65.5
67.4
TOOL NUMBER
PB02431NL6
PB02431NL6
PB02395HWRGV6
PB02395HWRGV6
8.500
GEM
10.90
43.0
9.2
18500
3.0
.270
.186
.220
.480
87.0
129.2
87.0
87.0
~
~
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction....... ......... . Down
Optical log depth units......... ..Feet
Data Reference Point..............Undefined
Frame Spacing....... ............. .60 .1IN
Max frames per record........ .... . Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
RAT MADan FT/H 4 1 68 4 2
GR MAD071 API 4 1 68 8 3
RPX MAD071 OHMM 4 1 68 12 4
RPS MADan OHMM 4 1 68 16 5
RPM MAD071 OHMM 4 1 68 20 6
RPD MADon OHMM 4 1 68 24 7
FET MADOn HR 4 1 68 28 8
NPHI MADOn PU-S 4 1 68 32 9
FCNT MADOn CP30 4 1 68 36 10
NCNT MADOn CP30 4 1 68 40 11
RHOB MADOn G/CM 4 1 68 44 12
DRHO MADan G/CM 4 1 68 48 13
PEF MAD071 B/E 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 16946.5 17342.5 17144.5 793 16946.5 17342.5
RAT MADOn FT/H 1. 25 164.62 95.5657 625 17030.5 17342.5
GR MAD071 API 27.55 219.51 53.6267 627 16989 17302
RPX MADon OHMM 1.19 61.47 25.5667 625 16982 17294
RPS MADOn OHMM 1.13 98.14 32.618 625 16982 17294
RPM MADon OHMM 1.28 89.19 35.1661 625 16982 17294
RPD MADOn OHMM 1. 77 133.91 48.1591 625 16982 17294
FET MADOn HR 37.7 103.21 68.4103 625 16982 17294
NPHI MAD071 PU-S 9.7 72 .39 21.1368 625 16946.5 17258.5
FCNT MADan CP30 577.95 1493.11 987.867 625 16946.5 17258.5
NCNT MADan CP30 2284.28 4316.29 3470.56 625 16946.5 17258.5
RHOB MADan G/CM 2.25 2.89 2.49338 624 16955.5 17267
DRHO MADon G/CM -0.02 0.3 0.0441346 624 16955.5 172 67
PEF MADan B/E 1. 83 10.22 4.89426 624 16955.5 172 67
First Reading For Entire File......... .16946.5
Last Reading For Entire File...........17342.5
File Trailer
Service name.............STSLIB.009
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/11/06
Maximum Physical Record..65535
File Type................LO
Next File Name.......... .STSLIB.OIO
Physical EOF
~
\ ~
Tape Trailer
Service name............ .LISTPE
Date.....................02/11/06
Origin...................STS
Tape Name................UNKNOWN
Continuation Number..... .01
Next Tape Name.......... . UNKNOWN
Comments................ .STS LIS
Reel Trailer
Service name.............LISTPE
Date.....................02/11/06
Origin...................STS
Reel Name. ... ........... . UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
Comments................ .STS LIS
Physical EOF
Physical EOF
End Of LIS File
Writing Library.
Writing Library.
~
Scientific Technical Services
Scientific Technical Services
~
Sperry-Sun Drilling Services
LIS Scan utility
$Revision: 3 $
LisLib $Revision: 4 $
Thu Oct 31 11:58:08 2002
Reel Header
Service name............ .LISTPE
Date.....................02/10/31
Origin...................STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Previous Reel Name.......UNKNOWN
Comments................ .STS LIS
Tape Header
Service name.............LISTPE
Date.....................02/10/31
Origin...................STS
Tape Name................UNKNOWN
Continuation Number......01
Previous Tape Name...... . UNKNOWN
Comments.................STS LIS
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay Unit - Niakuk
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 2
AK-MW-22005
B. HENNINGSE
L. VAUGHN
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 9
AK-MW-22005
B. HENNINGSE
A. MADSEN
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
#
WELL CASING RECORD
Writing Library.
Writing Library.
NK-llA
500292278901
BP Exploration
Sperry Sun
31-0CT-02
MWD RUN 4
AK-MW-22005
B. HENNINGSE
L. VAUGHN
36
12N
15E
1312
1021
.00
53.85
21.74
~
Scientific Technical Services
Scientific Technical Services
(Alaska), Inc.
MWD RUN 5
AK-MW-22005
C.A. DEMOSKI
L. VAUGHN
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
9.625 10699.0
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
#
REMARKS:
1.
ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
cxoa. ~OOd
I JJ13
~
~
STATED.
2. MWD RUN 1 & 3 ARE DIRECTIONAL ONLY TO SET WHIPSTOCK
AND MILL CASING AND ARE
NOT PRESENTED.
3. MWD RUNS 2 & 4 ARE DIRECTIONAL WITH DUAL GAMMA RAY
(DGR) UTILIZING GEIGER
MUELLER TUBE DETECTORS.
4. MWD RUNS 5 & 9 ARE DIRECTIONAL WITH DUAL GAMMA RAY
(DGR) UTILIZING GEIGER
MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE
RESISTIVITY PHASE 4
(EWR4) , COMPENSATED NEUTRON POROSITY (CNP), AND
STABILIZED LITH-DENSITY (SLD).
5. MWD RUN 2 WAS USED TO TIE-IN GAMMA RAY TO NK-11 AND
SET BRIDGE PLUG.
NO FOOTAGE DRILLED ON THIS RUN. GAMMA RAY ONLY IS
PRESENTED FOR THIS
RUN FROM 10634' MD, 5735' TVD TO 10699' MD, 5755'
TVD.
6. GAMMA RAY (SGRC) IS LOGGED BEHIND CASING FROM 10634'
MD, 5735' TVD TO
10699' MD, 5755' TVD.
7. DEPTH SHIFTING / CORRECTION OF MWD DATA IS WAIVED
PER THE EMAIL
MESSAGE FROM D. SCHNORR OF 02/19/02. MWD DATA
CONSIDERED PDC.
NK-11A IS TIED INTO NK-11APB1 AT THE KICK OFF
POINT.
THIS WELL KICKS OFF FROM NK-11 AT 10699' MD, 5755'
TVD (TOP OF WHIPSTOCK).
THIS WELL KICKS OFF FROM NK-11APB1 AT 15266' MD,
8185' TVD.
ALL MWD LOG AND HEADER DATA RETAINS THE ORIGINAL
DRILLER'S
DEPTH REFERENCES.
8. MWD RUNS 1 - 5 & 9 REPRESENT WELL NK-11A WITH API #
50-029-22789-01.
THIS WELL REACHED A TOTAL DEPTH OF 17867' MD, 9334'
TVD.
SROP = SMOOTHED RATE OF PENETRATION
SGRC = SMOOTHED GAMMA RAY COMBINED
SEXP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
EXTRA SHALLOW SPACING)
SESP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
SHALLOW SPACING)
SEMP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
MEDIUM SPACING)
SEDP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
DEEP SPACING)
SFXE = SMOOTHED
SBD2 = SMOOTHED
SCO2 = SMOOTHED
BIN)
SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR
FORMATION EXPOSURE TIME
BULK DENSITY (LOW-COUNT BIN)
STANDOFF CORRECTION (LOW-COUNT
(LOW-COUNT BIN)
SPSF = SMOOTHED COMPENSATED NEUTRON POROSITY
(SANDSTONE MATRIX, FIXED HOLE SIZE)
SNNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT
RATE
SNFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT
RATE
ENVIRONMENTAL PARAMETERS USED IN PROCESSING THE
NEUTRON LOG DATA:
HOLE SIZE:
8.5"
MUD WEIGHT:
11.05 PPG
MUD FILTRATE SALINITY:
PPM CHLORIDES
FORMATION WATER SALINITY:
FLUID DENSITY:
GICC
MATRIX DENSITY:
GICC
LITHOLOGY:
SANDSTONE
~
$
File Header
Service name.............STSLIB.001
Service Sub Level Name...
Version Number.. ........ .1.0.0
Date of Generation.......02/10/31
Maximum Physical Record..65535
File Type............ ....LO
Previous File Name.. ..., .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
NPHI
FCNT
NCNT
DRHO
RHOB
PEF
RPX
RPS
RPM
RPD
FET
$
1
~
9.3 -
750 - 19,000
15,000 PPM CHLORIDES
1. 00
2.65
clipped curves; all bit runs merged.
.5000
START DEPTH
10634.0
10735.0
11853.5
11853.5
11853.5
11862.5
11862.5
11862.5
11888.5
11888.5
11888.5
11888.5
11888.5
STOP DEPTH
17810.0
17867.0
17766.0
17766.0
17766.0
17775.5
17775.5
17775.5
17802.5
17802.5
17802.5
17802.5
17802.5
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED
PBU
MWD
MWD
MWD
MWD
$
DATA SOURCE
TOOL CODE
BIT RUN NO
2
4
5
9
#
REMARKS:
MERGED MAIN PASS.
$
MERGE TOP
10634.0
10699.5
11957.5
15266.5
MERGE BASE
10699.0
11957.0
15266.0
17867.0
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction..... ........., ..Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.....................60 .lIN
Max frames per record.............Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order
Units Size Nsam Rep Code Offset Channel
~
~
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HR 4 1 68 28 8
NPHI MWD PU-S 4 1 68 32 9
FCNT MWD CP30 4 1 68 36 10
NCNT MWD CP30 4 1 68 40 11
RHOB MWD G/CM 4 1 68 44 12
DRHO MWD G/CM 4 1 68 48 13
PEF MWD B/E 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10634 17867 14250.5 14467 10634 17867
ROP MWD FT/H 0.18 1219.38 147.644 14265 10735 17867
GR MWD API 23.45 436.78 108.523 14353 10634 17810
RPX MWD OHMM 1. 05 42.31 5.56556 11829 11888.5 17802.5
RPS MWD OHMM 1. 04 45.74 6.10027 11829 11888.5 17802.5
RPM MWD OHMM 1. 03 50.2 6.55933 11829 11888.5 17802.5
RPD MWD OHMM 1. 04 73.68 7.36805 11829 11888.5 17802.5
FET MWD HR 0.17 22.91 1.86956 11829 11888.5 17802.5
NPHI MWD PU-S 10.46 81.76 39.562 11826 11853.5 17766
FCNT MWD CP30 491.45 1362.45 673.812 11826 11853.5 17766
NCNT MWD CP30 2121. 93 4253.29 2842.88 11826 11853.5 17766
RHOB MWD G/CM 1.5 3.3 2.4333 11827 11862.5 17775.5
DRHO MWD G/CM -0.1 0.97 0.0597041 11827 11862.5 17775.5
PEF MWD B/E 1.72 16.29 3.7848 11827 11862.5 17775.5
First Reading For Entire File........ ..10634
Last Reading For Entire File...........17867
File Trailer
Service name.............STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/10/31
Maximum Physical Record. .65535
File Type................LO
Next File Name...........STSLIB.002
Physical EOF
File Header
Service name.............STSLIB.002
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation. ..... .02/10/31
Maximum Physical Record..65535
File Type................LO
Previous File Name...... .STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
$
2
header data for each bit run in separate files.
2
.5000
START DEPTH
10634.0
STOP DEPTH
10699.0
#
LOG HEADER DATA
DATE LOGGED:
19-JAN-02
~.
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.. ...0
Logging Direction....... ......... . Down
Optical log depth units........ ...Feet
Data Reference Point.. .......... ..Undefined
Frame Spacing......... """"" ..60 .lIN
Max frames per record............ .Undefined
Absent value......................-999
Depth units.......................
Datum Specification Block sub-type...O
Name Service Order
DEPT
GR MWD020
~
Insite 4.05.5
66.16
Memory
10699.0
74.6
74.8
TOOL NUMBER
PB02394HG6
8.500
LSND
9.40
56.0
9.5
2300
.0
.000 .0
.000 95.0
.000 .0
.000 .0
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
API 4 1 68 4 2
Name Service Unit
DEPT FT
GR MWD020 API
Min
10634
23.45
Max
10699
68.07
First Reading For Entire File..........10634
Last Reading For Entire File...........10699
File Trailer
Service name...... ...... .STSLIB.002
Service Sub Level Name...
Mean Nsam
10666.5 131
39.4395 131
First
Reading
10634
10634
Last
Reading
10699
10699
~.
version Number.......... .1.0.0
Date of Generation...... .02/10/31
Maximum Physical Record..65535
File Type............ ....LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name.............STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/10/31
Maximum Physical Record..65535
File Type................LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
3
~.
header data for each bit run in separate files.
4
.5000
START DEPTH
10699.5
10735.0
STOP DEPTH
11915.5
11957.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
22-JAN-02
Insite 4.05.5
66.16
Memory
11957.0
50.3
72.4
TOOL NUMBER
PB02394HG6
8.500
LSND
9.30
55.0
9.5
1850
5.8
.000
.000
.000
.000
.0
102.2
.0
.0
/~.
~
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.... ........... ...0
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units..... ..... .Feet
Data Reference Point..... ........ . Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value......................-999
Depth Units...... ............ .....
Datum Specification Block sub-type. ..0
Name Service Order
DEPT
ROP MWD040
GR MWD040
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10699.5 11957 11328.3 2516 10699.5 11957
ROP MWD040 FT/H 2.13 445.93 146.412 2445 10735 11957
GR MWD040 API 26.32 122.79 73.257 2433 10699.5 11915.5
First Reading For Entire File..........10699.5
Last Reading For Entire File.......... .11957
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation..... ..02/10/31
Maximum Physical Record..65535
File Type................LO
Next File Name....... ....STSLIB.004
Physical EOF
File Header
Service name..... ....... .STSLIB.004
Service Sub Level Name...
Version Number.... . . . . . . .1. 0.0
Date of Generation...... .02/10/31
Maximum Physical Record..65535
File Type................LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
NCNT
FCNT
NPHI
PEF
DRHO
RHOB
RPS
FET
RPX
RPM
4
header data for each bit run in separate files.
5
.5000
START DEPTH
11853.5
11853.5
11853.5
11862.5
11862.5
11862.5
11888.5
11888.5
11888.5
11888.5
STOP DEPTH
15266.0
15266.0
15266.0
15266.0
15266.0
15266.0
15266.0
15266.0
15266.0
15266.0
.~
RPD
GR
ROP
$
11888.5
11916.0
11957.5
15266.0
15266.0
15266.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
CNP
SLD
EWR4
DGR
$
BOTTOM)
TOOL TYPE
COMPENSATED NEUTRON
STABILIZED LITHO DEN
ELECTROMAG. RESIS. 4
DUAL GAMMA RAY
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type. ....0
Logging Direction.................Down
Optical log depth units... ....... .Feet
Data Reference Point.... .,....... .Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type. ..0
.~
27-JAN-02
Insite 4.05.5
66.16
Memory
17102.0
49.0
66.6
TOOL NUMBER
PB02431NL6
PB02431NL6
PB02395HWRGV6
PB02395HWRGV6
8.500
GEM
10.90
42.0
8.9
19500
2.9
.125
.066
.220
.360
75.0
149.0
75.0
75.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD050 FT/H 4 1 68 4 2
GR MWD050 API 4 1 68 8 3
RPX MWDO50 OHMM 4 1 68 12 4
RPS MWD050 OHMM 4 1 68 16 5
RPM MWD050 OHMM 4 1 68 20 6
RPD MWD050 OHMM 4 1 68 24 7
FET MWD050 HR 4 1 68 28 8
~
~,
NPHI MWD050 PU-S 4 1 68 32 9
FCNT MWD050 CP30 4 1 68 36 10
NCNT MWD050 CP30 4 1 68 40 11
RHOB MWD050 G/CM 4 1 68 44 12
DRHO MWD050 G/CM 4 1 68 48 13
PEF MWD050 B/E 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 11853.5 15266 13559.8 6826 11853.5 15266
ROP MWD050 FT/H 0.46 1219.38 206.449 6618 11957.5 15266
GR MWD050 API 23.64 150.15 94.5067 6701 11916 15266
RPX MWD050 OHMM 1. 05 12.62 3.44419 6756 11888.5 15266
RPS MWD050 OHMM 1. 04 11.39 3.46923 6756 11888.5 15266
RPM MWD050 OHMM 1. 03 11.76 3.54557 6756 11888.5 15266
RPD MWD050 OHMM 1. 04 14.05 3.70026 6756 11888.5 15266
FET MWD050 HR 0.17 22.91 1.36101 6756 11888.5 15266
NPHI MWD050 PU-S 20.71 59.89 36.6964 6826 11853.5 15266
FCNT MWD050 CP30 508.91 907 642.253 6826 11853.5 15266
NCNT MWD050 CP30 2333.19 3530.23 2863.07 6826 11853.5 15266
RHOB MWD050 G/CM 2.13 3.3 2.4311 6808 11862.5 15266
DRHO MWD050 G/CM -0.08 0.97 0.0703114 6808 11862.5 15266
PEF MWD050 B/E 1.72 6.93 2.89053 6808 11862.5 15266
First Reading For Entire Fi1e..........11853.5
Last Reading For Entire Fi1e...........15266
File Trailer
Service name.............STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation..... ..02/10/31
Maximum Physical Record..65535
File Type................LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Service name.............STSLIB.005
Service Sub Level Name...
Version Number. ......... .1.0.0
Date of Generation...... .02/10/31
Maximum Physical Record..65535
File Type............ ....LO
Previous File Name...... .STSLIB.004
Cormnent Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPS
Rap
PEF
RPX
RPM
RPD
FET
NPHI
FCNT
NCNT
RHOB
DRHO
GR
5
header data for each bit run in separate files.
9
.5000
START DEPTH
15266.5
15266.5
15266.5
15266.5
15266.5
15266.5
15266.5
15266.5
15266.5
15266.5
15266.5
15266.5
15266.5
STOP DEPTH
17802.5
17867.0
17775.5
17802.5
17802.5
17802.5
17802.5
17766.0
17766.0
17766.0
17775.5
17775.5
17810.0
~.
$
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
CNP
SLD
EWR4
DGR
$
BOTTOM)
TOOL TYPE
COMPENSATED NEUTRON
STABILIZED LITHO DEN
ELECTROMAG. RESIS. 4
DUAL GAMMA RAY
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units......... ..Feet
Data Reference Point.. ......... ...Undefined
Frame Spacing....... .......... ... .60 .1IN
Max frames per record.............Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
~,
11-FEB-02
Insite 4.05.5
66.16
Memory
17867.0
56.9
68.8
TOOL NUMBER
PB02431NL6
PB02431NL6
PB02395HWRGV6
PB02395HWRGV6
8.500
KCL/GEM GP
10.90
46.0
9.1
14000
3.2
.230
.095
.250
.300
68.0
174.0
65.0
69.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD090 FT/H 4 1 68 4 2
GR MWD090 API 4 1 68 8 3
RPX MWD090 OHMM 4 1 68 12 4
RPS MWD090 OHMM 4 1 68 16 5
RPM MWD090 OHMM 4 1 68 20 6
RPD MWDO90 OHMM 4 1 68 24 7
FET MWDO90 HR 4 1 68 28 8
NPHI MWD090 PU-S 4 1 68 32 9
FCNT MWD090 CP30 4 1 68 36 10
NCNT MWD090 CP30 4 1 68 40 11
/~
~
RHOB MWD090
DRHO MWD090
PEF MWD090
G/CM
G/CM
B/E
4
4
4
1
1
1
68
68
68
44
48
52
12
13
14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 15266.5 17867 16566.8 5202 15266.5 17867
ROP MWD090 FT/H 0.18 463.26 73.4117 5202 15266.5 17867
GR MWD090 API 25.15 436.78 145.624 5088 15266.5 17810
RPX MWD090 OHMM 1. 68 42.31 8.3907 5073 15266.5 17802.5
RPS MWD090 OHMM 1. 97 45.74 9.60418 5073 15266.5 17802.5
RPM MWD090 OHMM 1. 94 50.2 10.5729 5073 15266.5 17802.5
RPD MWD090 OHMM 2.01 73.68 12.2526 5073 15266.5 17802.5
FET MWD090 HR 0.67 22.83 2.54683 5073 15266.5 17802.5
NPHI MWD090 PU-S 10.46 81.76 43.4742 5000 15266.5 17766
FCNT MWD090 CP30 491.45 1362.45 716.896 5000 15266.5 17766
NCNT MWD090 CP30 2121.93 4253.29 2815.31 5000 15266.5 17766
RHOB MWD090 G/CM 1.5 3.17 2.43629 5019 15266.5 17775.5
DRHO MWD090 G/CM -0.1 0.43 0.0453158 5019 15266.5 17775.5
PEF MWD090 B/E 2.4 16.29 4.99782 5019 15266.5 17775.5
First Reading For Entire File......... .15266.5
Last Reading For Entire File.......... .17867
File Trailer
Service name............ .STSLIB.005
Service Sub Level Name...
Version Number...... .... .1.0.0
Date of Generation. ..... .02/10/31
Maximum Physical Record. .65535
File Type................LO
Next File Name......... ..STSLIB.006
Physical EOF
Tape Trailer
Service name.............LISTPE
Date.....................02/10/31
Origin...................STS
Tape Name................UNKNOWN
Continuation Number..... .01
Next Tape Name...........UNKNOWN
Comments.................STS LIS
Writing Library.
Scientific Technical Services
Reel Trailer
Service name... ......... .LISTPE
Date.....................02/10/31
Origin...................STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Next Reel Name...........UNKNOWN
Comments.................STS LIS
Writing Library.
Scientific Technical Services
Physical EOF
Physical EOF
End Of LIS File
-~
,.-....
a Qa-OOd
I ¡¿;;íz.j
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Thu Oct 24 16:30:40 2002
Reel Header
Service name............ .LISTPE
Date.....................02/10/24
Origin...................STS
Reel Name............... . UNKNOWN
Continuation Number..... .01
Previous Reel Name... ... . UNKNOWN
Comments................ .STS LIS
Writing Library.
Scientific Technical Services
Tape Header
Service name............ .LISTPE
Date.....................02/l0/24
Origin...................STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name.......UNKNOWN
Comments.................STS LIS
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay Unit - Niakuk
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
#
WELL CASING RECORD
1ST STRING
Writing Library.
Scientific Technical Services
NK-llAPB1
500292278970
BP Exploration
Sperry Sun
24-0CT-02
(Alaska), Inc.
MWD RUN 2
AK-MW-22005
B. HENNINGSE
L. VAUGHN
MWD RUN 4
AK-MW-22005
B. HENNINGSE
L. VAUGHN
MWD RUN 5
AK-MW-22005
C.A. DEMOSKI
L. VAUGHN
MWD RUN 6
AK-MW-22005
C.A. DEMOSKI
L. VAUGHN
MWD RUN 7
AK-MW-22005
C.A. DEMOSKI
A. MADSEN
MAD RUN 7
AK-MW-22005
C.A. DEMOSKI
A. MADSEN
MWD RUN 8
AK-MW-22005
C.A. DEMOSKI
A. MADSEN
36
12N
15E
1312
1021
MSL 0)
.00
53.85
21. 74
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
9.625 10699.0
,---,
----,
2ND STRING
3RD STRING
PRODUCTION STRING
#
REMARKS:
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
STATED.
2. MWD RUN 1 & 3 ARE DIRECTIONAL ONLY TO SET WHIPSTOCK
AND MILL CASING AND ARE
NOT PRESENTED.
3. MWD RUNS 2 & 4 ARE DIRECTIONAL WITH DUAL GAMMA RAY
(DGR) UTILIZING GEIGER
MUELLER TUBE DETECTORS.
4. MWD RUNS 5 - 8 ARE DIRECTIONAL WITH DUAL GAMMA RAY
(DGR) UTILIZING GEIGER
MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE
RESISTIVITY PHASE 4
(EWR4) , COMPENSATED NEUTRON POROSITY (CNP) , AND
STABILIZED LITH-DENSITY (SLD).
5. MWD RUN 2 WAS USED TO TIE-IN GAMMA
SET BRIDGE PLUG.
NO FOOTAGE DRILLED ON THIS RUN.
PRESENTED FOR THIS
RUN FROM 10634' MD, 5735' TVD TO
TVD.
RAY TO NK-ll AND
GAMMA RAY ONLY IS
10699' MD, 5755'
6. GAMMA RAY (SGRC) IS LOGGED BEHIND CASING FROM 10634'
MD, 5735' TVD TO
10699' MD, 5755' TVD.
7. A MADPASS WAS PERFORMED WHILE PULLING OUT OF THE
HOLE AFTER DRILLING
MWD RUN 7 AND IS PRESENTED AS A TAIL TO THIS LOG.
8. DEPTH SHIFTING / CORRECTION OF MWD DATA IS WAIVED
PER THE EMAIL
MESSAGE FROM D. SCHNORR OF 02/19/02. MWD DATA
CONSIDERED PDC.
THIS WELL KICKS OFF FROM NK-11 AT 10699' MD, 5755'
TVD (TOP OF WHIPSTOCK).
ALL MWD LOG AND HEADER DATA RETAINS THE ORIGINAL
DRILLER'S
DEPTH REFERENCES.
9. MWD RUNS 1 - 8 REPRESENT WELL NK-11APB1 WITH API #
50-029-22789-70.
THIS WELL REACHED A TOTAL DEPTH OF 17535' MD, 9169'
TVD.
SROP = SMOOTHED RATE OF PENETRATION
SGRC = SMOOTHED GAMMA RAY COMBINED
SEXP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
EXTRA SHALLOW SPACING)
SESP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
SHALLOW SPACING)
SEMP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
MEDIUM SPACING)
SEDP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
DEEP SPACING)
SFXE = SMOOTHED
SBD2 = SMOOTHED
SC02 = SMOOTHED
BIN)
SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR
FORMATION EXPOSURE TIME
BULK DENSITY (LOW-COUNT BIN)
STANDOFF CORRECTION (LOW-COUNT
(LOW-COUNT BIN)
SPSF = SMOOTHED COMPENSATED NEUTRON POROSITY
(SANDSTONE MATRIX, FIXED HOLE SIZE)
SNNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT
RATE
SNFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT
~,
RATE
~
CURVES WITH THE EXTENSION "M" ARE MEASURED AFTER
DRILLING (MAD)
ENVIRONMENTAL PARAMETERS USED IN PROCESSING THE
NEUTRON LOG DATA:
HOLE SIZE:
8.5"
MUD WEIGHT:
10.9 PPG
MUD FILTRATE SALINITY:
PPM CHLORIDES
FORMATION WATER SALINITY:
FLUID DENSITY:
GICC
MATRIX DENSITY:
GICC
LITHOLOGY:
SANDSTONE
$
File Header
Service name.............STSLIB.OOl
Service Sub Level Name...
Version Number....... ....1.0.0
Date of Generation...... .02/10/24
Maximum Physical Record..65535
File Type................LO
Previous File Name.... ...STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
NCNT
FCNT
NPHI
DRHO
RHOB
PEF
RPD
FET
RPM
RPS
RPX
$
1
9.4 -
1,650 - 19,500
15,000 PPM CHLORIDES
1. 00
2.65
clipped curves; all bit runs merged.
.5000
START DEPTH
10634.0
10735.0
11853.5
11853.5
11853.5
11862.5
11862.5
11862.5
11888.5
11888.5
11888.5
11888.5
11888.5
STOP DEPTH
17494.5
17535.0
17451.0
17451.0
17451.0
17460.0
17460.0
17460.0
17487.0
17487.0
17487.0
17487.0
17487.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE
MWD 2 10634.0 10699.0
MWD 4 10699.5 11957.0
MWD 5 11957.5 17102.0
MWD 6 17102.5 17335.0
MWD 7 17335.5 17338.0
MWD 8 17338.5 17535.0
$
#
REMARKS: MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type..................O
r---
~,
Data Specification Block Type.....O
Logging Direction... ............ ..Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type. ..0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HR 4 1 68 28 8
NPHI MWD PU-S 4 1 68 32 9
FCNT MWD CP30 4 1 68 36 10
NCNT MWD CP30 4 1 68 40 11
RHOB MWD G/CM 4 1 68 44 12
DRHO MWD G/CM 4 1 68 48 13
PEF MWD B/E 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10634 17535 14084.5 13803 10634 17535
ROP MWD FT/H 0.46 1219.38 158.668 13601 10735 17535
GR MWD API 13.1 365.31 110.213 13722 10634 17494.5
RPX MWD OHMM 1. 05 1324.67 9.44859 11198 11888.5 17487
RPS MWD OHMM 1. 04 2000 27.9491 11198 11888.5 17487
RPM MWD OHMM 1. 03 2000 25.8304 11198 11888.5 17487
RPD MWD OHMM 1. 04 2000 49.4582 11198 11888.5 17487
FET MWD HR 0.17 98.31 3.19117 11198 11888.5 17487
NPHI MWD PU-S 5.4 81.76 39.4887 11196 11853.5 17451
FCNT MWD CP30 489.43 2173.75 700.803 11196 11853.5 17451
NCNT MWD CP30 2161.1 4840.17 2845.76 11196 11853.5 17451
RHOB MWD G/CM 2.07 3.3 2.45062 11196 11862.5 17460
DRHO MWD G/CM -0.12 0.97 0.0658369 11196 11862.5 17460
PEF MWD B/E 1. 52 15.36 3.49962 11196 11862.5 17460
First Reading For Entire File.. ....... .10634
Last Reading For Entire File... ....... .17535
File Trailer
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation... ....02/10/24
Maximum Physical Record..65535
File Type................LO
Next File Name.... ...... .STSLIB.002
Physical EOF
File Header
Service name.............STSLIB.002
Service Sub Level Name...
Version Number........ ...1.0.0
Date of Generation.... ...02/10/24
Maximum Physical Record..65535
File Type................LO
Previous File Name...... .STSLIB.001
Corrnnent Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MAD
2
~
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
NPHI
FCNT
NCNT
RHOB
DRHO
PEF
RPM
RPS
RPD
FET
RPX
GR
RAT
$
~
clipped curves; all MAD runs merged using earliest passes.
.5000
START DEPTH
16946.5
16946.5
16946.5
16955.5
16955.5
16955.5
16982.0
16982.0
16982.0
16982.0
16982.0
16989.0
17030.5
#
MERGED
PBU
MWD
$
DATA SOURCE
TOOL CODE
MAD RUN NO. MAD PASS NO.
7 1
MERGE BASE
17342.5
#
REMARKS:
MERGED MAD PASS.
$
STOP DEPTH
17258.5
17258.5
17258.5
172 67.0
17267.0
17267.0
17294.0
17294.0
17294.0
17294.0
17294.0
17302.0
17342.5
MERGE TOP
16946.5
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction...... .......... . Down
Optical log depth units......... ..Feet
Data Reference Point... .......... .Undefined
Frame Spacing.....................60 .lIN
Max frames per record.............Undefined
Absent value......................-999
Depth Units.......... .......... ...
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
RAT MAD FT/H 4 1 68 4 2
GR MAD API 4 1 68 8 3
RPX MAD OHMM 4 1 68 12 4
RPS MAD OHMM 4 1 68 16 5
RPM MAD OHMM 4 1 68 20 6
RPD MAD OHMM 4 1 68 24 7
FET MAD HR 4 1 68 28 8
NPHI MAD PU-S 4 1 68 32 9
FCNT MAD CP30 4 1 68 36 10
NCNT MAD CP30 4 1 68 40 11
RHOB MAD G/CM 4 1 68 44 12
DRHO MAD G/CM 4 1 68 48 13
PEF MAD B/E 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 16946.5 17342.5 17144.5 793 16946.5 17342.5
RAT MAD FT/H 1.25 164. 62 95.5657 625 17030.5 17342.5
GR MAD API 27.55 219.51 53.6267 627 16989 17302
RPX MAD OHMM 1.19 61.47 25.5667 625 16982 17294
RPS MAD OHMM 1.13 98.14 32.618 625 16982 17294
RPM MAD OHMM 1.28 89.19 35.1661 625 16982 17294
RPD MAD OHMM 1. 77 133.91 48.1591 625 16982 17294
FET MAD HR 37.7 103.21 68.4103 625 16982 17294
NPHI MAD PU-S 9.7 72.39 21.1368 625 16946.5 17258.5
FCNT MAD CP30 577.95 1493.11 987.867 625 16946.5 17258.5
NCNT MAD CP30 2284.28 4316.29 3470.56 625 16946.5 17258.5
RHOB MAD G/CM 2.25 2.89 2.49338 624 16955.5 17267
DRHO MAD G/CM -0.02 0.3 0.0441346 624 16955.5 17267
PEF MAD B/E 1. 83 10.22 4.89426 624 16955.5 17267
~
First Reading For Entire File......... .16946.5
Last Reading For Entire File...........17342.5
File Trailer
Service name.............STSLIB.002
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation..... ..02/10/24
Maximum Physical Record. .65535
File Type................LO
Next File Name......... ..STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation...... .02/10/24
Maximum Physical Record. .65535
File Type...... ......... .LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
$
3
header data for each bit run in separate files.
2
.5000
START DEPTH
10634.0
STOP DEPTH
10699.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
19-JAN-02
Insite 4.05.5
66.16
Memory
10728.0
74.6
74.8
TOOL NUMBER
PB02394HG6
8.500
LSND
9.40
56.0
9.5
2300
.0
.000 .0
.000 95.0
.000 .0
.000 .0
~,
~
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction....... ........ ..Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.................... .60 .lIN
Max frames per record............ .Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type. ..0
Name Service Order
DEPT
GR MWD020
Units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
API 4 1 68 4 2
Name Service Unit
DEPT FT
GR MWD020 API
Min
10634
23.45
Max
10699
68.07
Mean Nsam
10666.5 131
39.4395 131
First Reading For Entire File..........10634
Last Reading For Entire File...........10699
File Trailer
Service name.............STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/10/24
Maximum Physical Record..65535
File Type................LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name......... ... .STSLIB.004
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation...... .02/10/24
Maximum Physical Record. .65535
File Type................LO
Previous File Name.... ...STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
Rap
$
4
header data for each bit run in separate files.
4
.5000
START DEPTH
10699.5
10735.0
STOP DEPTH
11915.5
11957.0
#
LOG HEADER DATA
DATE LOGGED:
22-JAN-02
~,
First
Reading
10634
10634
Last
Reading
10699
10699
/"""
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type... ..0
Logging Direction..... ......... ...Down
Optical log depth units...........Feet
Data Reference Point........ ..... .Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order
DEPT
ROP MWD040
GR MWD040
~
Insite 4.05.5
66.16
Memory
11957.0
50.3
72 .4
TOOL NUMBER
PB02394HG6
8.500
LSND
9.30
55.0
9.5
1850
5.8
.000
.000
.000
.000
.0
102.2
.0
.0
units Size Nsam Rep Code Offset Channel
FT 4 1 68 0 1
FT/H 4 1 68 4 2
API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 10699.5 11957 11328.3 2516 10699.5 11957
ROP MWD040 FT/H 2.13 445.93 146.412 2445 10735 11957
GR MWD040 API 26.32 122.79 73.257 2433 10699.5 11915.5
First Reading For Entire File..........lO699.5
Last Reading For Entire File.......... .11957
File Trailer
,~
Service name....... .... ..STSLIB.004
Service Sub Level Name...
Version Number..... ..... .1.0.0
Date of Generation...... .02/10/24
Maximum Physical Record..65535
File Type................LO
Next File Name...........STSLIB.005
Physical EOF
File Header
Service name.......... ...STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/10/24
Maximum Physical Record..65535
File Type........ ........LO
Previous File Name...... .STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
FCNT
NPHI
NCNT
RHOB
DRHO
PEF
FET
RPD
RPM
RPS
RPX
GR
ROP
$
5
------
header data for each bit run in separate files.
5
.5000
START DEPTH
11853.5
11853.5
11853.5
11862.5
11862.5
11862.5
11888.5
11888.5
11888.5
11888.5
11888.5
11916.0
11957.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
CNP
SLD
EWR4
DGR
$
STOP DEPTH
16996.5
16996.5
16996.5
17006.0
17006.0
17006.0
17032.5
17032.5
17032.5
17032.5
17032.5
17040.5
17102.0
BOTTOM)
TOOL TYPE
COMPENSATED NEUTRON
STABILIZED LITHO DEN
ELECTROMAG. RESIS. 4
DUAL GAMMA RAY
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
27-JAN-02
Insite 4.05.5
66.16
Memory
17102.0
49.0
66.6
TOOL NUMBER
PB02431NL6
PB02431NL6
PB02395HWRGV6
PB02395HWRGV6
8.500
GEM
10.90
42.0
.~
~
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
8.9
19500
2.9
.125
.066
.220
.360
75.0
149.0
75.0
75.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.. ...0
Logging Direction.... .......... ...Down
Optical log depth units........ ...Feet
Data Reference Point. .......... ...Undefined
Frame Spacing.....................60 .lIN
Max frames per record.......... ...Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD050 FT/H 4 1 68 4 2
GR MWD050 API 4 1 68 8 3
RPX MWD050 OHMM 4 1 68 12 4
RPS MWD050 OHMM 4 1 68 16 5
RPM MWD050 OHMM 4 1 68 20 6
RPD MWD050 OHMM 4 1 68 24 7
FET MWD050 HR 4 1 68 28 8
NPHI MWD050 PU-S 4 1 68 32 9
FCNT MWD050 CP30 4 1 68 36 10
NCNT MWD050 CP30 4 1 68 40 11
RHOB MWD050 G/CM 4 1 68 44 12
DRHO MWD050 G/CM 4 1 68 48 13
PEF MWD050 B/E 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 11853.5 17102 14477.8 10498 11853.5 17102
ROP MWD050 FT/H 0.46 1219.38 173.319 10290 11957.5 17102
GR MWD050 API 23.64 365.31 125.688 10250 11916 17040.5
RPX MWD050 OHMM 1. 05 46.41 5.22337 10289 11888.5 17032.5
RPS MWD050 OHMM 1. 04 69.13 5.64409 10289 11888.5 17032.5
RPM MWD050 OHMM 1. 03 1709.35 6.35886 10289 11888.5 17032.5
RPD MWD050 OHMM 1. 04 1910.48 7.46379 10289 11888.5 17032.5
FET MWD050 HR 0.17 23.94 1. 63962 10289 11888.5 17032.5
NPHI MWD050 pu-s 20.71 81.76 41.4964 10287 11853.5 16996.5
FCNT MWD050 CP30 508.91 959 660.714 10287 11853.5 16996.5
NCNT MWD050 CP30 2161.1 3530.23 2763.54 10287 11853.5 16996.5
RHOB MWD050 G/CM 2.07 3.3 2.4437 10288 11862.5 17006
DRHO MWD050 G/CM -0.12 0.97 0.065832 10288 11862.5 17006
PEF MWD050 B/E 1. 52 15.36 3.38242 10288 11862.5 17006
First Reading For Entire File...... ... .11853.5
Last Reading For Entire File.......... .17102
File Trailer
Service name. ........... .STSLIB.005
Service Sub Level Name...
Version Number... ....... .1.0.0
.~
Date of Generation...... .02/10/24
Maximum Physical Record. .65535
File Type................LO
Next File Name.......... .STSLIB.006
Physical EOF
File Header
Service name..... ""'" .STSLIB.006
Service Sub Level Name...
Version Number....... ....1.0.0
Date of Generation...... .02/10/24
Maximum Physical Record. .65535
File Type.......... ......LO
Previous File Name...... .STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
NPHI
FCNT
NCNT
DRHO
RHOB
PEF
RPX
RPM
FET
RPS
RPD
GR
ROP
$
6
~,
header data for each bit run in separate files.
6
.5000
START DEPTH
16997.0
16997.0
16997.0
17006.5
17006.5
17006.5
17033.0
17033.0
17033.0
17033.0
17033.0
17041.0
17102.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
17244.0
17244.0
17244.0
17253.5
17253.5
17253.5
17280.0
17280.0
17280.0
17280.0
17280.0
17287.5
17335.0
30-JAN-02
Insite 4.05.5
66.16
Memory
17335.0
64.8
67.4
TOOL STRING (TOP TO
VENDOR TOOL CODE
CNP
SLD
EWR4
DGR
$
BOTTOM)
TOOL TYPE
COMPENSATED NEUTRON
STABILIZED LITHO DEN
ELECTROMAG. RESIS. 4
DUAL GAMMA RAY
TOOL NUMBER
PB02431NL6
PB02431NL6
PB02395HWRGV6
PB02395HWRGV6
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
8.500
GEM
10.90
43.0
9.2
19500
2.8
~
~
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
.260
.164
.210
.470
88.0
143.6
88.0
88.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type............. .....0
Data Specification Block Type.....O
Logging Direction.... .......... ...Down
Optical log depth units......... ..Feet
Data Reference Point... .......... .Undefined
Frame Spacing........... ........ ..60 .1IN
Max frames per record.............Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD060 FT/H 4 1 68 4 2
GR MWD060 API 4 1 68 8 3
RPX MWD060 OHMM 4 1 68 12 4
RPS MWD060 OHMM 4 1 68 16 5
RPM MWD060 OHMM 4 1 68 20 6
RPD MWD060 OHMM 4 1 68 24 7
FET MWD060 HR 4 1 68 28 8
NPHI MWD060 PU-S 4 1 68 32 9
FCNT MWD060 CP30 4 1 68 36 10
NCNT MWD060 CP30 4 1 68 40 11
RHOB MWD060 G/CM 4 1 68 44 12
DRHO MWD060 G/CM 4 1 68 48 13
PEF MWD060 B/E 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 16997 17335 17166 677 16997 17335
ROP MWD060 FT/H 1. 93 94.64 16.7045 466 17102.5 17335
GR MWD060 API 30.69 87.97 52.2337 494 17041 17287.5
RPX MWD060 OHMM 6.83 54.99 27.3052 495 17033 17280
RPS MWD060 OHMM 9.27 91.05 35.4556 495 17033 17280
RPM MWD060 OHMM 12.45 90.01 38.2289 495 17033 17280
RPD MWD060 OHMM 14.37 132.17 52.7169 495 17033 17280
FET MWD060 HR 3.49 47.31 16.1406 495 17033 17280
NPHI MWD060 PU-S 9.17 31.74 16.435 495 16997 17244
FCNT MWD060 CP30 664.08 1507.15 1059.03 495 16997 17244
NCNT MWD060 CP30 2698.42 4381.63 3724.97 495 16997 17244
RHOB MWD060 G/CM 2.24 2.66 2.49317 495 17006.5 17253.5
DRHO MWD060 G/CM -0.09 0.33 0.0611919 495 17006.5 17253.5
PEF MWD060 B/E 2.06 8.07 4.09026 495 17006.5 17253.5
First Reading For Entire File......... .16997
Last Reading For Entire File...........17335
File Trailer
Service name............ .STSLIB.006
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......02/10/24
Maximum Physical Record..65535
File Type................LO
".-....,
Next File Name...........STSLIB.007
Physical EOF
File Header
Service name............ .STSLIB.007
Service Sub Level Name...
Version Number...........l.O.O
Date of Generation...... .02/10/24
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.006
Conunent Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
j¡
FILE SUMMARY
VENDOR TOOL CODE
NCNT
FCNT
NPHI
RHOB
DRHO
PEF
FET
RPX
RPS
RPM
RPD
GR
ROP
$
7
,~
header data for each bit run in separate files.
7
.5000
START DEPTH
17244.5
17244.5
17244.5
17254.0
17254.0
17254.0
17280.5
17280.5
17280.5
17280.5
17280.5
17288.0
17335.5
j¡
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
j¡
STOP DEPTH
17254.5
17254.5
17254.5
172 63.5
172 63.5
17263.5
17289.5
17289.5
17289.5
17289.5
17289.5
17297.5
17338.0
TOOL STRING (TOP TO
VENDOR TOOL CODE
CNP
SLD
EWR4
DGR
$
BOTTOM)
TOOL TYPE
COMPENSATED NEUTRON
STABILIZED LITHO DEN
ELECTROMAG. RESIS. 4
DUAL GAMMA RAY
j¡
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
j¡
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
31-JAN-02
Insite 4.05.5
66.16
Memory
17338.0
65.5
67.4
TOOL NUMBER
PB02431NL6
PB02431NL6
PB02395HWRGV6
PB02395HWRGV6
8.500
GEM
10.90
43.0
9.2
18500
3.0
.270
.186
87.0
129.2
~
~
MUD FILTRATE AT MT:
MUD CAKE AT MT:
.220
.480
87.0
87.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type........... .......0
Data Specification Block Type. ....0
Logging Direction...... """" ...Down
Optical log depth units. """'" .Feet
Data Reference Point....... """ . Undefined
Frame Spacing....... ........, "" .60 .1IN
Max frames per record.............Undefined
Absent value......................-999
Depth Units................ ""'"
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD070 FT/H 4 1 68 4 2
GR MWD070 API 4 1 68 8 3
RPX MWD070 OHMM 4 1 68 12 4
RPS MWD070 OHMM 4 1 68 16 5
RPM MWD070 OHMM 4 1 68 20 6
RPD MWD070 OHMM 4 1 68 24 7
FET MWD070 HR 4 1 68 28 8
NPHI MWD070 PU-S 4 1 68 32 9
FCNT MWD070 CP30 4 1 68 36 10
NCNT MWD070 CP30 4 1 68 40 11
RHOB MWD070 G/CM 4 1 68 44 12
DRHO MWD070 G/CM 4 1 68 48 13
PEF MWD070 B/E 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 17244.5 17338 17291.3 188 17244.5 17338
ROP MWD070 FT/H 4.68 41.23 29.505 6 17335.5 17338
GR MWD070 API 51. 65 59.51 54.7055 20 17288 17297.5
RPX MWD070 OHMM 24.13 32.09 27.5384 19 17280.5 17289.5
RPS MWD070 OHMM 29.24 38.17 33.8184 19 17280.5 17289.5
RPM MWD070 OHMM 31. 59 39.84 35.6911 19 17280.5 17289.5
RPD MWD070 OHMM 39.58 46.07 42.9768 19 17280.5 17289.5
FET MWD070 HR 34.66 36.89 35.0268 19 17280.5 17289.5
NPHI MWD070 PU-S 18.225 21.14 20.1929 21 17244.5 17254.5
FCNT MWD070 CP30 835.93 972.79 867.288 21 17244.5 17254.5
NCNT MWD070 CP30 3392.82 3726.06 3462.57 21 17244.5 17254.5
RHOB MWD070 G/CM 2.41 2.48 2.4495 20 17254 17263.5
DRHO MWD070 G/CM -0.03 0.07 -0.0115 20 17254 17263.5
PEF MWD070 B/E 2.01 3.47 2.53075 20 17254 17263.5
First Reading For Entire File...... .., .17244.5
Last Reading For Entire File...........17338
File Trailer
Service name............ .STSLIB.007
Service Sub Level Name...
Version Number......... ..1.0.0
Date of Generation...... .02/10/24
Maximum Physical Record. .65535
File Type................LO
Next File Name. """'" .STSLIB.008
,"-"'"
Physical EOF
File Header
Service name.............STSLIB.008
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation...... .02/10/24
Maximum Physical Record. .65535
File Type................LO
Previous File Name...... .STSLIB.007
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
NPHI
FCNT
NCNT
RHOB
DRHO
PEF
RPM
RPS
RPD
FET
RPX
GR
ROP
$
8
~.
header data for each bit run in separate files.
8
.5000
START DEPTH
17255.0
17255.0
17255.0
17264.0
17264.0
17264.0
17290.0
17290.0
17290.0
17290.0
17290.0
17298.0
17338.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
17451.0
17451.0
17451.0
17460.0
17460.0
17460.0
17487.0
17487.0
17487.0
17487.0
17487.0
17494.5
17535.0
TOOL STRING (TOP TO
VENDOR TOOL CODE
CNP
SLD
EWR4
DGR
$
BOTTOM)
TOOL TYPE
COMPENSATED NEUTRON
STABILIZED LITHO DEN
ELECTROMAG. RESIS. 4
DUAL GAMMA RAY
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
03-FEB-02
Insite 4.05.5
66.16
Memory
17535.0
67.9
69.0
TOOL NUMBER
PB02431NL6
PB02431NL6
PB02395HWRGV6
PB02395HWRGV6
8.500
GEM
10.90
47.0
9.1
18000
3.3
.190
.105
.320
.420
82.0
154.0
82.0
82.0
~
~-
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction... ........... ...Down
Optical log depth units........ ...Feet
Data Reference Point...... ....... .Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD080 FT/H 4 1 68 4 2
GR MWD080 API 4 1 68 8 3
RPX MWD080 OHMM 4 1 68 12 4
RPS MWD080 OHMM 4 1 68 16 5
RPM MWD080 OHMM 4 1 68 20 6
RPD MWD080 OHMM 4 1 68 24 7
FET MWD080 HR 4 1 68 28 8
NPHI MWD080 PU-S 4 1 68 32 9
FCNT MWD080 CP30 4 1 68 36 10
NCNT MWD080 CP30 4 1 68 40 11
RHOB MWD080 G/CM 4 1 68 44 12
DRHO MWD080 G/CM 4 1 68 48 13
PEF MWD080 B/E 4 1 68 52 14
First Last
Name Service unit Min Max Mean Nsam Reading Reading
DEPT FT 17255 17535 17395 561 17255 17535
ROP MWD080 FT/H 2.46 142.95 21.9386 394 17338.5 17535
GR MWD080 API 13.1 104.29 34.8847 394 17298 17494.5
RPX MWD080 OHMM 1. 73 1324.67 96.2602 395 17290 17487
RPS MWD080 OHMM 4.04 2000 599.264 395 17290 17487
RPM MWD080 OHMM 6.88 2000 517.016 395 17290 17487
RPD MWD080 OHMM 10.44 2000 1139.56 395 17290 17487
FET MWD080 HR 1. 93 98.31 25.8471 395 17290 17487
NPHI MWD080 PU-S 5.4 65.56 17.0041 393 17255 17451
FCNT MWD080 CP30 489.43 2173.75 1290.06 393 17255 17451
NCNT MWD080 CP30 2314.99 4840.17 3857.47 393 17255 17451
RHOB MWDO80 G/CM 2.27 2.72 2.57812 393 172 64 17460
DRHO MWD080 G/CM -0.03 0.36 0.0757506 393 172 64 17460
PEF MWDO80 B/E 2.21 11. 57 5.87285 393 17264 17460
First Reading For Entire File..........17255
Last Reading For Entire File...........17535
File Trailer
Service name........... ..STSLIB.008
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation... ... .02/10/24
Maximum Physical Record. .65535
File Type.. ... """"" .LO
Next File Name...........STSLIB.OO9
Physical EOF
~
File Header
Service name. ... ........ .STSLIB.009
Service Sub Level Name...
Version Number... ....... .1.0.0
Date of Generation...... .02/10/24
Maximum Physical Record..65535
File Type...... ......... .LO
Previous File Name...... .STSLIB.008
Comment Record
FILE HEADER
FILE NUMBER:
RAW MAD
Curves and log
DEPTH INCREMENT:
MAD RUN NUMBER:
MAD PASS NUMBER:
#
FILE SUMMARY
VENDOR TOOL CODE
NCNT
FCNT
NPHI
RHOB
DRHO
PEF
RPX
RPS
RPM
RPD
FET
GR
RAT
$
9
~,
header data for each pass of each run in separate files.
.5000
7
1
START DEPTH
16946.5
16946.5
16946.5
16955.5
16955.5
16955.5
16982.0
16982.0
16982.0
16982.0
16982.0
16989.0
17030.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
STOP DEPTH
17258.5
17258.5
17258.5
17267.0
172 67.0
172 67.0
17294.0
17294.0
17294.0
17294.0
17294.0
17302.0
17342.5
TOOL STRING (TOP TO
VENDOR TOOL CODE
CNP
SLD
EWR4
DGR
$
BOTTOM)
TOOL TYPE
COMPENSATED NEUTRON
STABILIZED LITHO DEN
ELECTROMAG. RESIS. 4
DUAL GAMMA RAY
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
31-JAN-02
Insite 4.05.5
66.16
Memory
17338.0
65.5
67.4
TOOL NUMBER
PB02431NL6
PB02431NL6
PB02395HWRGV6
PB02395HWRGV6
8.500
GEM
10.90
43.0
9.2
18500
3.0
.270
.186
.220
.480
87.0
129.2
87.0
87.0
.~
~,
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction........ ........ . Down
Optical log depth units.. ........ .Feet
Data Reference Point........ ..... . Undefined
Frame Spacing... ............ ..... .60 .1IN
Max frames per record.............Undefined
Absent value......................-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
RAT MADOn FT/H 4 1 68 4 2
GR MADOn API 4 1 68 8 3
RPX MADOn OHMM 4 1 68 12 4
RPS MAD071 OHMM 4 1 68 16 5
RPM MADOn OHMM 4 1 68 20 6
RPD MADOn OHMM 4 1 68 24 7
FET MAD071 HR 4 1 68 28 8
NPHI MADOn PU-S 4 1 68 32 9
FCNT MAD071 CP30 4 1 68 36 10
NCNT MAD071 CP30 4 1 68 40 11
RHOB MAD071 G/CM 4 1 68 44 12
DRHO MADOn G/CM 4 1 68 48 13
PEF MADOn B/E 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 16946.5 17342.5 17144.5 793 16946.5 17342.5
RAT MADOn FT/H 1. 25 164. 62 95.5657 625 17030.5 17342.5
GR MAD071 API 27 .55 219.51 53.6267 627 16989 17302
RPX MAD071 OHMM 1.19 61. 47 25.5667 625 16982 17294
RPS MAD071 OHMM 1.13 98.14 32.618 625 16982 17294
RPM MADOn OHMM 1. 28 89.19 35.1661 625 16982 17294
RPD MADOn OHMM 1. 77 133.91 48.1591 625 16982 17294
FET MADOn HR 37.7 103.21 68.4103 625 16982 17294
NPHI MADOn PU-S 9.7 72 .39 21.1368 625 16946.5 17258.5
FCNT MADOn CP30 577.95 1493.11 987.867 625 16946.5 17258.5
NCNT MAD071 CP30 2284.28 4316.29 3470.56 625 16946.5 17258.5
RHOB MADOn G/CM 2.25 2.89 2.49338 624 16955.5 172 67
DRHO MADOn G/CM -0.02 0.3 0.0441346 624 16955.5 172 67
PEF MADOn B/E 1. 83 10.22 4.89426 624 16955.5 17267
First Reading For Entire File... ...... .16946.5
Last Reading For Entire File...........17342.5
File Trailer
Service name.............STSLIB.009
Service Sub Level Name...
Version Number...........l.0.0
Date of Generation. ..... .02/10/24
Maximum Physical Record..65535
File Type................LO
Next File Name...........STSLIB.OI0
Physical EOF
Tape Trailer
Service name.. .......... .LISTPE
~
Date.....................02/l0/24
Origin.................. .STS
Tape Name............ ... . UNKNOWN
Continuation Number..... .01
Next Tape Name...........UNKNOWN
Comments.................STS LIS
Reel Trailer
Service name.............LISTPE
Date.....................02/10/24
Origin...................STS
Reel Name................UNKNOWN
Continuation Number..... .01
Next Reel Name......... ..UNKNOWN
Comments.......... .......STS LIS
Physical EOF
Physical EOF
End Of LIS File
Writing Library.
Writing Library.
~
Scientific Technical Services
Scientific Technical Services