Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
193-132
MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Friday, May 19, 2023 SUBJECT:Mechanical Integrity Tests TO: FROM:Guy Cook P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC P2-46 PRUDHOE BAY UN PTM P2-46 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 05/19/2023 P2-46 50-029-22401-00-00 193-132-0 G SPT 8286 1931320 2072 2470 2476 2475 2476 0 392 382 376 4YRTST P Guy Cook 4/3/2023 Testing completed with a Little Red Services pump truck and calibrated gauges. 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UN PTM P2-46 Inspection Date: Tubing OA Packer Depth 72 3100 3068 3058IA 45 Min 60 Min Rel Insp Num: Insp Num:mitGDC230402112414 BBL Pumped:7 BBL Returned:4.6 Friday, May 19, 2023 Page 1 of 1 Operator Name:2. Development Exploratory Service 5 Permit to Drill Number:193-132 6.50-029-22401-00-00 PRUDHOE BAY, PT MCINTYRE OIL BP Exploration (Alaska), Inc 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 9356 9034 8964 8330 None 9034 8286 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 41 - 121 41 - 121 1530 520 Surface 3668 13-3/8" 40 - 3708 40 - 3707 5020 2260 Intermediate Production 9304 9-5/8" 37 - 9341 37 - 9260 6870 / 3520 4760 / 2020 Perforation Depth: Measured depth: 8874 - 9186 feet True vertical depth:8810 - 9111 feet Tubing (size, grade, measured and true vertical depth)5-1/2" 17# L-80 35 - 8405 35 - 8358 8330 8286Packers and SSSV (type, measured and true vertical depth) 5-1/2" Baker SABL-3 Packer Liner 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 166090 28079 137 26423 3028 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Schultz, Kirsten L Kirsten.Schultz@bp.com Authorized Name:Schultz, Kirsten L Authorized Title: Authorized Signature with Date:Contact Phone:+1 907 564 5105 Treatment descriptions including volumes used and final pressure: 13. Petroleum Engineer Operations Performed1. Abandon Plug Perforations 5 Fracture Stimulate Pull Tubing GSTOR WINJ WAG 5 GINJ SUSP SPLUG 16. Well Status after work:Oil Gas Exploratory Development Stratigraphic 15. Well Class after work: 5Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured9275 Sundry Number or N/A if C.O. Exempt: N/A 5-1/2" TRSV SSSV 2247 2246 Junk Packer Printed and Electronic Fracture Stimulation Data 5 Set Sand Plug Operations shutdown Change Approved Program 5 Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well 3.Address: P.O. Box 196612 Anchorage, AK 99519-6612 7.Property Designation (Lease Number):ADL 034624 PTM P2-46 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations By Samantha Carlisle at 10:56 am, Jun 01, 2020 Kirsten Schultz Digitally signed by Kirsten Schultz Date: 2020.06.01 09:34:17 -08'00'RBDMS HEW 6/1/2020 MGR01JUN20 DSR-6/1/2020 ACTIVITYDATE SUMMARY 4/29/2020 CTU #9 - 1.75" Coil, 0.156" wt Job Objective: Sand Dump. MIRU CTU. ...Job in Progress... 4/30/2020 CTU #9 1.75" CT. Job Scope: Sand Dump MU & RIH w/ HES 2-7/8" Logging Carrier & 3.0" Nozzle. Tag TD at 9154' CTM. Log up to 8200'. Flagged pipe at 8900.5'. Pooh. Receive good data ( + 23' Correction). Correct PBTD = 9178'. Correlated to Slb Cement Log 24-Oct-1993. MU & RIH w/ 2.0" BJN. Tag TD at 9155' CTM. Correct nozzle depth to 9178'. Kill well with 265 bbls 1% KCL & 50 bbls diesel. Pick up 10' above TD & Begin to lay in 30 bbl Sand Slurry (20/40 river sand @ 8ppa). With 10 bbls remaining in Coil, Coil plugged off. Attempt to free up with no sucess. Decision to start Pooh. Unable to reverse circulate out sand at surface. Trim 144' of pipe to clear coil. Clear up coil & jet BOP. MU & RIH w/ 1.75" sand dump nozzle BHA. ***In Progress*** 5/1/2020 CTU #9 1.75" CT. Job Scope: Sand Dump Continue to RIH w/ 1.75" dump nozzle. Tag sand top at 9047' CTM. Kill well w/ 210bbls of 1% KCL & 10bbls meth. Pick up 15' above TD & Lay in 11 bbl Sand Slurry (20/40 river sand @ 5ppa). Wait on sand to settle. Final Sand Top @ 9034'. APE approved sand top. Pooh. Lay in Freeze Protect from 2500'. Rig Down CTU. ***Job Complete*** Daily Report of Well Operations PBU P2-46 MEMORANDUM State of Alaska Pretest Initial 15 Min 30 Min 45 Min 60 Min Alaska Oil and Gas Conservation Commission TO: Jim ReggIAC 4((gtq DATE: Monday, April 15, 2019 Integrity Tests P.I. Supervisor ' `& SUBJECT: Mechanical t BP EXPLORATION (ALASKA) MC. OA 89 390 399 401 395 395 P2-46 FROM: AUstin McLeod PRUDHOE BAY UN PTM P246 Petroleum Inspector Ste: Inspector Reviewed By: P.I. Suprv,�2- NON -CONFIDENTIAL Comm Well Name PRUDHOE BAY UN PTM P2-46 API Well Number 50-029-22401-00-00 Inspector Name: Austin McLeod Permit Number: 193-132-0 Inspection Date: 4/10/2019 ' Insp Num: mitSAM190410122505 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well P2-16 �Typelnj W''TVD 8286 - Tubings 1814 - 1560 1850" 1833 -� 1839_ IS58 " PTD 1931320 Type Test SPT Test psi IA 22 2600 2597 - 'SS0 2565 2559 20R - BBL Pumped: 5.1 - BBL Returned: OA 89 390 399 401 395 395 4.1 Interval 4YRTST PIF P Notes: MIT -LA - Monday, April 15, 2019 Page I of I MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Tuesday,April 28,2015 TO: Jim Reggr P.I.Supervisor �e 4`31/5- SUBJECT: Mechanical Integrity Tests (( 11 BP EXPLORATION(ALASKA)INC P2-46 FROM: Jeff Jones PRUDHOE BAY UN PTM P2-46 Petroleum Inspector Src: Inspector Reviewed By: P.I.Suprv� NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UN PTM P2-46 API Well Number 50-029-22401-00-00 Inspector Name: Jeff Jones Permit Number: 193-132-0 Inspection Date: 4/11/2015 Insp Num: m1JJ150411153402 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well P2-46 , Type Inj G TVD 8286 . Tubing 2838 2831 - 2831 - 2832 - -- PTD 1931320 ' Type Testi SPT Test psi 2072 - IA 687 2307 • 2292 • 2293 - Interval 4YRTST IPF P I OA 99 • 166 167 . 166 • Notes: 2 BBLS methanol pumped 1 well inspected,no exceptions noted Well temp 112 degrees F,methanol 8 degrees F. -- SCANNED W 2 2 2015 Tuesday,April 28,2015 Page 1 of 1 • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 20, 2012 4t, Mr. Jim Regg a-' Alaska Oil and Gas Conservation Commission q 333 West 7 Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPMA PM -2 Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPMA PM -2 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator . 0 BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) GPMA PM-2 Date: 04/302012 Corrosion Vol. of cement Final top of Cement top Corrosion inhibitor/ sealant Well Name P11)4 API 4 Initial top of cement pumped cement off date inhibitor date ft bbls ft na gal P2 -01 1970730 50029227610000 0.3 NA 0.3 NA 1.70 6/22/2009 P2 -03 1970440 50029227490000 2.0 NA 2.0 NA 1020 6/22/2009 P2-04 1981560 50029229070000 1.0 NA 1.0 NA 5.10 6/22/2009 P2 -06 1931030 50029223880000 4.0 NA 4.0 NA 30.60 6/22/2009 P2 -07 1940580 50029224690000 2.0 NA 2.0 NA 13.60 6/22/2009 P2 -08A 2061690 50029228960100 0.8 NA 0.8 NA 4.30 6/21/2009 P2 -09 1980660 50029228760000 0.3 NA 0.3 NA 0.85 6/21/2009 P2 -10 1980970 50029228860000 0.3 NA 0.3 NA 1.70 6/21/2009 P2 -11A 2060260 50029229230100 3.5 NA 3.5 NA 69.70 6/21/2009 P2 -12 1931150 50029223950000 Sealed conductor NA NA NA NA NA P2 -13 1970600 50029227570000 0.5 NA 0.5 NA 2.60 6/21/2009 P2 -14 1981050 50029228880000 1.5 NA 1.5 NA 10.20 6/21/2009 P2 -15A 2070320 50029224090100 Sealed conductor NA NA NA NA NA P2 -16 1931230 50029223970000 3.0 NA 3.0 NA 28.10 6/20/2009 P2 -17 1981370 50029229020000 0.8 NA 0.8 NA 3.40 6/20/2009 P2 -18 1940600 50029224710000 0.8 NA 0.8 NA 2.60 6/20/2009 P2 -19A 2070120 50029227650100 0.3 NA 0.3 NA 0.90 6/20/2009 P2 -20 1960590 50029226640000 0.5 NA 0.5 NA 2.60 6/20/2009 P2 -21 1940530 50029224670000 0.8 NA 0.8 NA 3.40 6/20/2009 P2 -22 1972490 50029228500000 1.0 NA 1.0 NA 7.70 6/20/2009 P2 -23 1940320 50029224530000 1.3 NA 1.3 NA 11.10 6/20/2009 P2 -24 1980080 50029228540000 1.5 NA 1.5 NA 1020 6/15/2009 P2 -25 1971110 50029227760000 1.8 NA 1.8 NA 17.90 6/10/2009 P2 -27 1971250 50029227850000 1.3 NA 1.3 NA 8.50 6/10/2009 P2 -28 1950440 50029225510000 3.3 NA 3.3 NA 37.40 4/18/2012 P2 -29 1931470 50029224070000 10.3 NA 10.3 NA 71.40 6/15/2009 P2 -30 1920950 50029222890000 2.8 NA 2.8 NA 17.90 6/10/2009 P2 -31 1940360 50029224560000 2.2 NA 22 NA 21.30 6/20/2009 P2 -32 1951350 50029225930000 Surface casing leak NA NA NA NA NA P2 -33B 1972310 50029228120200 2.0 NA 2.0 NA 16.60 6/9/2009 P2 -34 1950660 50029225580000 1.5 NA 1.5 NA 11.50 6/9/2009 P2 -35 1951790 50029226200000 1.0 NA 1.0 NA 13.60 6/9/2009 P2 -36A 2060220 50029228010100 1.1 NA 1.1 NA 6.00 6/9/2009 P2 -37A 2050570 50029225760100 2.0 NA 2.0 NA 23.00 6/9/2009 P2 -39 2111230 50029234540000 0.8 NA 0.8 NA 10.20 4/30/2012 P2 -40 1972260 50029228370000 0.5 NA 0.5 NA 5.10 6/9/2009 P2 -41 1952050 50029226330000 1.5 NA 1.5 NA 17.00 6/9/2009 P2-42 1931430 50029224050000 19.3 NA 19.3 NA 121.60 6/20/2009 P2-43 2050240 50029232500000 0.8 NA 0.8 NA 6.00 6/8/2009 P2-44 1960630 50029226660000 2.3 NA 2.3 NA 23.80 6/8/2009 P2-45B 2080210 50029227690200 0.8 NA 0.8 NA 5.10 6/8/2009 P2-46 1931320 50029224010000 2.3 NA 2.3 NA 25.50 6/8/2009 P2-47 1951900 50029226280000 0.0 NA 0.0 NA NA NA P2-48 1921260 50029223090000 0.2 NA 0.2 NA 1.70 4/18/2012 P2-49 1920240 50029222520000 2.5 NA 2.5 NA 18.70 6/7/2009 P2 -50B 1950960 50029222610200 2.0 NA 2.0 NA 23.00 6/8/2009 P2 -51 1920380 50029222620000 0.3 NA 0.3 NA 0.85 6/7/2009 P2 -52 1972010 50029228260000 3.8 NA 3.8 NA 47.60 6/7/2009 P2 -53 1960410 50029226560000 2.0 NA 2.0 NA 21.30 6/7/2009 P2 -54A 2030300 50029224700100 0.8 NA 0.8 NA 3.40 6/7/2009 P2 -55 1920820 50029222830000 4.0 NA 4.0 NA 79.90 6/22/2009 P2 -56 1951620 50029226100000 2.8 NA 2.8 NA 17.90 6/7/2009 P2 -57A 2022140 50029221830100 15.5 NA 15.5 NA 77.40 6/22/2009 P2 -58 1900080 50029220000000 Sealed conductor NA NA NA NA NA P2 -59A 1982010 50029220960100 Sealed conductor NA NA NA NA NA P2-60 1910910 _ 50029221920000 8.3 NA 8.3 NA 56.10 3/13/2012 MEMORANDUM • State of Alaska • Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: Tuesday, April 26, 2011 P.I. Supervisor � � � 1 Z�� // SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC P2 -46 FROM: John Crisp PRUDHOE BAY UN PTM P2-46 Petroleum Inspector Src: Inspector Reviewed By: P.I. Supry J ( - NON - CONFIDENTIAL Comm Well Name: PRUDHOE BAY UN PTM P246 API Well Number: 50- 029 - 22401 -00 -00 Inspector Name: John Crisp Insp Num: mitiCr110426122814 Permit Number: 193 - 132 - Inspection Date: 4/24/2011 Rel Insp Num: Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well P2 -46 - Type Inj. W ' TVD 8286 , IA 570 2510 - 2490 2480 - P.T.D 1931320 'ITypeTest SPT Test psi 2071 - OA 340 540• " 540 540 Interval p1 P - Tubing 1900 1900 1875 1850 Notes: 2.7 bbls pumped for test. - 1,ANNIMA" 4/M1 Tuesday, April 26, 2011 Page 1 of 1 STATE OF ALASKA ALAS~IL AND GAS CONSERVAT~ON COMMI~N REPORT UF SUNDRY WELL OPERATIONS ~ ~ '~L~f"" ~~ ~~~~~~.~~ ~,r~o9 1. Operations Abandon ~ Repair Well ~ Piug Perforations ~ Stimulate ~ Ot N WAG Performed: Aiter Casing ~ Pull Tubing~ PerForate New Pool ~ Waiver~ T e xtension ~ ~ Change Approved Program ~ Operat. Shutdown ~ Perforate ~ Re-enter S ~~I ~" " ~'''~' ~ ~a' F~ =.F ~~~ 2. Operator BP E~loration (A(aska), Inc. 4. Current Well Class: 5. Perrnit to DriN `~?~ ~~~~~~` rvame: De~elopment ~ Exploratory ~ 193-1320 3. Address: P.O. Box 196612 Stratigraphic I~~ Service ~!, 6. API Number: Anchorage,AK 99519-6612 50-029-22401-00-00 7. KB Elevation (ft): 9. WeN Name and Number: 50.3 KB P2-46 8. Property Designation: 10. Field/Pool(s): ADLO-034624 POINT McINTYRE Field/ PTMAC OIL Pool 11, Present Well Condition Summary: Total Depth measured 9356 feet Plugs (measured) None true vertical 9275.18 feet Junk (measured) None Effective Depth measured 9261 feet true vertical 9183.4 feet Casing Length Size MD ND Burst Collapse Conductor 80 20" 94# H-40 39 - 119 39 - 119 1530 520 Production 8333 9-5/8" 47# N-80 37 - 8370 37 - 8325 6870 4760 Production 16 9-5/8" 36# J-55 8370 - 8368 8325 - 8340 3520 2020 Production 955 9-5/8" 47# N-80 8386 - 9341 8340 - 9261 6870 4760 Surface 3670 13-3/8"68# N-80 38 - 3708 38 - 3703 4930 2270 PerForation depth: Measured depth: SEE ATTACHED - _ _ _ _ True Vertical depth: _ _ _ _ _ Tubing: (size, grade, and measured depth) 5-1/2" 17# L-80 35 - 8405 0 0 - Packers and SSSV {type and measured depth) 5-1/2" TRSV SSSV - 2247 5-1/2" Baker SABL-3 Packer 8330 0 0 0 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): - ~ ~ ; ~~, `J~~~jC~ `'~i~~~..~..` ~+1 ~ `~~~ ~''~ + . ~: ~ Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbi Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to weli operation: 5614 1133 Subsequentto operation: 16950 3062 14. Attachments: 15. Well Class after aroposed work: Copies of Logs and Surveys Run Exploratory ~ Development ("` Service ~ Daily Report of Well Operations X 16. Well Status after proposed work: Oil ~ Gas 1`~` WAG ~ GINJ ~ WINJ ~ WDSPL ~ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Preble Title Data Management Engineer Signature~, ~ ~'_____-~---~~-~~°~~ ~ Phone 564-4944 Date 7/23/2009 Form 10-404 Revised 04/2006 ~` ~y~ ~~~ ~ M~ ( ,/ Submit Original Oniy ~~~I~ ~N"L. ( ~ t 0~9 ~"`~{l7 ,. -~`-- ~ , r ~`. ,.-; P2-46 193-132 PERF OTTOCHMENT • Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base P2-46 5/30/94 PER 8,874. 8,894. 8,809.71 8,828.99 P2-46 5/30/94 PER 8,927. 8,947. 8,860.82 8,880.11 P2-46 5/30/94 PER 9,087. 9,197. 9,015.3 9,044.28 P2-46 5/19/04 APF 9,135. 9,165. 9,061.67 9,090.65 P2-46 5/19/04 APF 9,176. 9,186. 9,101.28 9,110.94 P2-46 4/27/06 APF 8,900. 8,920. 8,834.78 8,854.07 P2-46 4/27/06 APF 9,050. 9,080. 8,979.55 9,008.53 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PWG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE • • • P2-46 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 7~T/I/0=1300/450/360. Temp=Hot. MITIA Passed to 4000 psi (pre-MI) . AOGCC declined to witness by Lou Grimaldi. MITIA pressured up to 4000 psi with 4.9 bbls ineat meth. IAP lost 20 psi in first 15 mins, 0 psi in second 15 mins. For a total of 20 ; psi in 30 mins. Bled back - 4.5 bbls returns. Well left on injection with all casing ~valves in normal position at departure. Tagged wing, IA valves and notified DSO of ;results. FWHP's=1300/100/270. FLUIDS PUMPED BBLS 246 SCHMOO MIX 10 60/40 MEOH 5 NEAT METH 261 Total 10/15/08 .r... (~ ~~ ~~~~~mb~r~~~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well .Inh # N0.4931 F ~ e,., Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnkeni 333 West 7th Ave, Suite 1100 Anchorage, AK 99501 r .,., nee.. ...:,... 07-30B 12005233 SCMT ~ U = 09/22/08 v 1 v. 1 W-31 12031513 USIT L~~ 09/18/08 1 1 OS-35A 11975794 USIT . 09/11/08 1 1 M-08 12096917 PRODUCTION PROFILE - 10/06/08 1 1 P2-46 11970849 INJECTION PROFILE 10/09/08 1 1 D-08A 11962617 RST 08/21/08 1 1 05-02A 12103674 RST { ~ ~j 08/24/08 1 1 07-306 12005233 MCNL 09/23/08 1 1 13-14 11978482 RST - ~ 09/13/08 1 1 of on~r nnvwlroul rn..r . --~ •-- • •-•-••~ •. ~.~.........~...-.. . .... v.~n••..~~ n~~v n~~ Vn~~~~~Vl vnG vvr l GNVn 1 V: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered Alaska Data & Consulting Services 2525 Gambell Street, Suite 40 Anchorage, AK 99503- 8 ATTN: Beth Received by: • • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test Email to: Winton_Aubert@admin.sfate.ak.us; Bob_Fleckenstein@admin.state.ak.us; Jim_Regg@admin.state.ak.us; Tom_Maunder@admin.state.ak.us OPERATOR: BP Exploration (Alaska), Inc. _ ~' C~;~.- _~~/? y t FIELD /UNIT !PAD: Prudhoe Bay !GPMA / PM2 ~ DATE: 09/15/07 OPERATOR REP: Andrea Hughes AOGCC REP: /' Packer Depth Pretest Initial 15 Min. 30 Min. Well P2-29 Type Inj. W TVD 8686 Tubing 1900 2100 2100 2100 Interval O P.T.D. 1931470 Type test P Test psi 4000 Casing 25D 4000 3980 3970 P/F P Notes: MIT-IA pre-MI. OA 140 380 380 380 Well P2-46 Type In". W TVD /8286 Tubing 1300 1300 1300 1360 Interval O P.T.D. 1931320 T e test P Test psi -' 4000 Casing 45D 4D00 3980 3980 P!F P Notes: MIT-IA pre-MI. OA 360 740 746 740 Well Type Inj. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: OA Well Type Inj. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: OA Well Type Inj. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: OA TYPE INJ Codes TYPE TEST Codes INTERVAL Codes D =Drilling Waste M =Annulus Monitoring I =Initial Test G =Gas P =Standard Pressure Test 4 =Four Year Cycle I =Industrial Wastewater R =Internal Radioactive Tracer Survey V =Required by Variance N =Not injecting A =Temperature Anomaly Survey T =Test during Workover W =Water D =Differential Temperature Tes~~~ ~~~ y (~ ~ ~{~(~~ O =Other (describe in notes) ~3d ~ 3.Y '/ •~ MIT Report Form BFL 911105 MIT GPMA P2-29 P2-46 09-15-07.x1s _ STATE OF ALASKA . AlA~ Oil AND GAS CONSERVATION COM SION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon 0 Repair Well 0 Plug Perforations 0 Stimulate 0 Other 0 Performed: Alter Casing 0 Pull Tubing 0 Perforate New Pool 0 Waiver 0 Time Extension 0 Change Approved Program 0 Operat. Shutdown 0 Perforate [] Re-enter Suspended Well 0 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development Exploratory 193-1320 3. Address: P.O. Box 196612 Stratigraphic D Service M 6. API Number: Anchorage, AK 99519-6612 50-029-22401-00-00 7. KB Elevation (ft): 9. Well Name and Number: 50.3 KB P2-46 8. Property Designation: 10. Field/Pool(s): ADL-034624 POINT MCINTYRE Field/ POINT MCINTYRE Pool 11. Present Well Condition Summary: Total Depth measured 9356 feet Plugs (measured) None true vertical 9275.18 feet Junk (measured) None ¡;j~,k.b";'¡~iEn ,. -'$¡I' >I\:;;'-~/ Effective Depth measured 9261 feet true vertical 9183.4 feet Casing Length Size MD TVD Burst Collapse Conductor 80 20" 94# H-40 39 - 119 39 - 119 1530 520 Surface 3670 13-3/8" 68# NT -80 38 - 3708 38 - 3707.27 5020 2270 Production 16 9-5/8" 36#/47# J-55/NT 37 - 9341 37 - 9260.69 3520/6870 2020/4760 Perforation depth: Measured depth: 8874 - 8894 8900 - 8920 8927 - 8947 9050 - 9080 9087 - 9117 9135 - 9165 9176 - 9186 True Vertical depth: 8809.71 - 8828.99 8834.78 - 8854.07 8860.82 - 8880.11 8979.55 - 9008.53 9015.3 - 9044.28 9061.67 - 9090.65 9101.28 - 9110.94 Tubing: (size, grade, and measured depth) 5-1/2" 17# L-80 35 - 8405 Packers and SSSV (type and measured depth) 5-1/2" TRSV SSSV 2247 5-1/2" Baker SABL-3 Packer 8330 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: RBDMS 8FL JUL 2 7 2006 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 0 0 21766 20 1662 Subsequent to operation: 0 0 22211 20 1585 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run Exploratory Development Service M Daily Report of Well Operations X 16. Well Status after proposed work: Oil Gas WAG GINJ WINJ M WDSPl 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. I~Undry Number or N/A if C.O. Exempt: N/A Contact Sharmaine Vestal Printed Name Sharmaine Vestal -k Title Data Mgmt Engr .. Signature ~ Phone 564-4424 Date 7/13/2006 Form 10-404 Revised 04/2004 Submit Original Only e e ~ P2-46 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY FLUIDS PUMPED I B;LS I ::::L I ACTIVITYDA TE I SWMMARì¥ il 4/27/2006 PERFORATE FROM 8900' - 8920' AND 9050' - 9080' IN 3 RUNS. PERFORATION CORRELATED TO SLB CBL DATED 24-0CT-1993 ALL GUNS LOADED WITH 3.38" 3406 POWERJET HMX CHARGES. AP DATA: PEN = 38.6", EH = 0.45", EXP. LOAD = 22.7 GM RUN 1 : PERFORATE FROM 9060' - 9080'; CCL TO TOP SHOT = 3.6'; CCL STOP DEPTH = 9056.4' RUN 2: PERFORATE FROM 9050' - 9060'; CCL TO TOP SHOT = 3.6'; CCL STOP DEPTH = 9046.4' RUN 3; PERFORATE FROM 8900' - 8920'; CCL TO TOP SHOT = 3.6'; CCL STOP DEPTH = 8896.4' BOTTOM NOT TAGGED MEMORANDUM e State of Alaska e Alaska Oil and Gas Conservation Commission TO: Jim Regg Q 7(i'5IDtr P.l. Supervisor !"-.ef1' DATE: Wednesday, July 12,2006 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC P2-46 PRUDHOE BAY UN PTM P2-46 tq3-13?- FROM: JeffJones Petroleum Inspector Src: Inspector Reviewed By: P.l. Suprv .Yßr Comm NON-CONFIDENTIAL Well Name: PRUDHOE BAY UN PTMP2-46 API Well Number 50-029-2240 I -00-00 Inspector Name: Jeff Jones Insp Num: miUJ060711205344 Permit Number: 193-132-0 Inspection Date: 7/812006 ReI Insp Num Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. ~- IT I' I w I I ! I 1 Well I P2-46 8206 IA 65 2200 2170 2160 , ype nJ.. , TVD , , I I I I t P.T. I 1931320 ITypeTest i SPT I Test psi 2051.5 : OA 380 600 600 600 I I i Interval 4YRTST P/F P .../ Tubing I 1300 1300 1300 1300 i 1 Notes 5 bbls diesel pumped. I well house inspected; no exceptions noted. "... . <,;iì j~~~j\j~~. iJL) Wednesday, July 12, 2006 Page I of I .!--_. . TREE = WELLHEAD = A CTUA TOR = KB. ELBI = BF. ELBI = ~~--------~-- KOP= Max Angle = Datum MD = Datum TVD = CfI/V FMC BAKERC 53.5' e P2-46 ~FETY NOTES: I PBTD H . 2247' 1-f5-1/2" OTIS TRSV SSSV, 10 - 4.562" I GAS LIFT MANDRELS I 3708' 1-4 ~ ST MD TVD OBI TYÆ VLV LATCH PORT DATE L 1 4023 4022 44 LBO T2 2 8271 8230 16 LBO T2 380' H 5-1/2" PARKER SWS NIP, 10 == 4.562" I I I 8312' ~ 1'<:"7 I 8330' H9-5/8" X 5-1/2" BAKER SABL-3 PKR. 10 - 4.75" I P"'-" . I 8361' 1-1 5-1/2" PA RKER SWS NIP, 10 - 4.562" I -f 8370' ,~ V I I I 8380' H5-1/2" OTIS XN NIP, 10 == 4.555" I I -I 8386' I~ '/ -1 8405' I 8405' 1-15-1/2" TUBING TAIL, WLEG, 10 - 4.892" I I 8400' H ELMO TT LOGGED 05/30/94 I erf data DATE 05/30/94 04/28/06 05/30/94 04/28/06 I 05/30/94 OS/20/04 OS/20/04 I 9260' I 9341' ]~ ~ .._--------------.-.-.- 7118' 16 @ 8512' 8919' ~~ 8800' SS 113-318" CSG, 68#, NT-80.ID== 12.415" Minimum ID = 4.455" @ 8 OTIS XN NIPPLE I 9-5/8" CSG, 47#. NT-80, 10 == 8681" I 9-5/8" CSG, 36#, J-55, ID = 8.921" I I 5-112" TBG. 17#, L-80, 0.0232 bpf, 10 = 4.892" I ÆRFORATüNSUMMARY REF LOG: DIUGR ON 09/27/93 ANGLE AT TOP PERF: 15 @ 8874' Note: Refer to Production DB for historical p SIZE SPF INTERVAL Opn/Sqz 3-3/8" 6 8874 - 8894 0 3-3/8" 6 8900 - 8920 0 3-3/8" 6 8927 - 8947 0 3-3/8" 6 9050 - 9080 0 3-3/8" 6 9087 - 9117 0 3-318" 6 9135-9165 0 3-3/8" 6 9176 - 9186 0 19-518" CSG. 47#, NT-80, 10 == 8.681"1-1 DATE 09/29/93 OS/20/04 03/09/06 04/28/06 RBI BY COMMENTS ORIGINAL COMPLETION MJA/KAK ADPERFS RWITLH ÆRF CORRECTüNS (02/23/06) DFRlPJC ADÆRFS DATE RBI BY COMMENTS POINT MCINTY RE UNIT WELL: P2-46 ÆRMIT No: '1931320 APt No: 50-029-22401-00 SEe 14 T12N R14E 3317,77 FEL 274.7 FNL BP Exploration (Alaska) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Abandon 0 Alter Casing 0 Change Approved Program 0 2. Operator Repair WellO PluQ PerforationsD Pull Tubing 0 Perforate New Pool D Operation Shutdown 0 Perforate ŒJ 4. Current Well Class: Stimulate 0 OtherO waiverD Time ExtensionO Re-enter Suspended WellO 5. Permit to Drill Number: 193-1320 Name: BP Exploration (Alaska), Inc. 3. Address: P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): 50.30 8. Property Designation: ADL-034624 11. Present Well Condition Summary: Total Depth measured 9356 true vertical 9275.2 feet Junk (measured) None Exploratory 0 Service ŒJ Development D Stratigraphic D 9. Well Name and Number: P2-46 10. Field/Pool(s): Pt Mcintyre Oil Field / Pt Mcintyre Oil Pool 6. API Number 50-029-22401-00-00 feet Plugs (measured) None Effective Depth measured 9261 feet true vertical 9183.4 feet Casing Conductor Production Production Production Surface Length 80 8333 16 955 3670 Perforation deoth: Size 20" 94# H-40 9-5/8" 47# N-80 9-5/8" 36# J-55 9-5/8" 47# N-80 13-3/8" 68# N-80 MD TVD Burst Collapse 39 119 39.0 - 119.0 1530 520 37 - 8370 37.0 - 8324.8 6870 4760 8370 - 8386 8324.8 - 8340.2 3520 2020 8386 - 9341 8340.2 - 9260.7 6870 4760 38 - 3708 38.0 - 3707.3 4930 2270 Measured depth: 8874 - 8894,8927 - 8947,9087 - 9117,9135 - 9165,9176 - 9186 True vertical depth: 8809.71 - 8828.99, 8860.82 - 8880.11, 9015.3 - 9044.28, 9061.67 - 9090.65, 9101.28 - 9110.94 Tubing (size, grade. and measured depth): 5-1/2" 17# L-80 @ 35 - 8405 RE{::E~\lEl) Packers & SSSV (type & measured depth): 5-112" Baker SABL-3 Packer 5-1/2" TRSV SSSV @ 8330 @ 2247 ') ',J ,.; ¡ n ?(I. 14 ,"'i,td1\,j ~)m¡ ;~ Gæ Cons. C{\mm~~jr:~H I' ,', \,ijt.tO{)n~F' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions Including volumes used and final pressure: 13 Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys run - Od-Bbl 0 Reoresentative Daily Average Production or Injection Data Gas-Met Water-Bbt Casing Pressure 0 -27526 250 Tubing Pressure 1616 1661 0 0 -28429 250 15. Well Class after proposed work: ExploratoryD 16. Well Status after proposed work: OilD GasD DevelopmentD Service ŒJ WAG D GINJD WINJŒJ WDSPLD Prepared by Garry Catron (907) 564-4657. Sundry Number or N/A if C.O. Exempt: 303-376 Daily Report of Well Operations. ! 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Printed Name Garry Catron Garry Catron 11~ Signature Form 1 0-404 Revised 4/2004 Title Production Technical Assistant {\~. Date 8/3/04 Phone 564-4657 r-;", :"\- ""~~I'~;': .II¡::,~ ",~\I~i\)j 1 ] I~~Ü\J~¡ P2-46 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 05/19/04 PERFORATED 9176.8'-9186.8' , (TAG TO AT 9187'), AND 9135'-9165' WITH 33/83406 POWERJET, 6 SPF, 38.6" PENE, 0.45" EH. 22.7 GMS, CORRELATED TO SWS CET LOG DATED 10-24-93. FLUIDS PUMPED BBLS No Fluids Pumped 0 ITOTAL Page 1 TREE = WELLHEA D = 'ACWA TOR = KB, 8...EV = BF. 8...EV = KOP= Max Angle = Dalum M) = Dalum TVD= CWV FWC BA KER C 53.5' 7118' 16 @ 8512' 8919' 8800' SS 13-318" CSG, 68#, NT-80,ID = 12.415" H 3708' Minimum ID = 4.455" @ 8380' OTIS XN NIPPLE P2-46 (f) ~ L I . SAFETY NOTES: 2247' H 5-1/Z'OTISTRSV SSSV, 10 =4.562" 1 GAS LIFT MANDRELS .. ST MD TVD DEV lY Æ V LV LA TCH PORT Oå. TE 1 4023 4022 44 LBO T2 2 8271 8230 16 LBD T2 8312' H 5-112" PA RKER SWS NIP, 10 = 4.562" 1 :8: z--I 8330' l-i 9-5/8" x 5-1/2" BAKER SABL-3 A<R ID = 4.75" 1 I 9-5/8" CSG, 47#, NT-80, ID=8,681" 1-1 8370' I~ / 9-5/8" CSG, 36#, J-55,ID = 8,921" l-i 8386' ~ 5-1/2" TBG, 17#, L-80, 0,0232 bpr, ID=4,892" l-i 8405' PERFORATION SUMMA RY REF LOG: DlLlGR ON 09/27/93 ANGLE A TTOP ÆRF: 15 @ 8874' Note: Ref er to A'oduc ton DB for his torical perf data SIZE SPF INTERV AL Opn/Sqz DA TE 3-3/8" 6 8874 - 8894 0 05/30/94 3-3/8" 6 8927 - 8947 0 05/30/94 3-3/8" 6 9087 - 9117 0 05/30/94 3-3/8" 6 9176 - 9186 0 OS/20/04 3-3/8" 6 9180 - 9190 0 OS/20104 1 RnD 1-1 9260' 9-5/8" CSG, 47#, NT-80, ID = 8,681" l-i 9341' DATE REV BY COMMENTS 09/29/93 ORIGINAL COMPLETION 09/19/01 RN/KA K CORREGrIONS OS/20104 MJAiKAK ADPERFS I I / I I ~ DA TE REV BY COMMENTS 8361' 1-1 5-1/2"PARKERSWSNIP,Ð=4.562" 1 8380' 1-1 5-1/2' OTIS XN NIP, ID = 4,555" 1 8405' l-i 5-1/2" TLBING TAIL, WLEG, ID= 4,892" 1 8400' I~ 8...MD TT LOGGED 05/30/94 1 POINT MaNlY RE UNIT W8...L: P2-46 ÆRMIT No: 1931320 API No: 50-029-22401-00 SEC 14 T12N R14E3317.77 FEL 274.7 FNL 8P Exploration (Alaska) ~A- I '-I j f {à:J:J (" STATE OF ALASKA ( 0 í'S 12.../''1 I -: ALASKA OIL AND GAS CONSERVATION COMMISSION ~ I ~/~ - APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 1. Type of Request: Abandon 0 Suspend 0 Operation Shutdown 0 PerforateOO VarianceD Annular DisposalD Alter CasinQ 0 Repair Well 0 PluQ Perforations 0 StimulateD Time ExtensionD OtherD Chanae Approved Proqram 0 Pull Tubina 0 Perforate New Pool D Re-enter Suspended Well 0 2. Operator 4. Current Well Class: 5. Permit to Drill Number: Name' BP Exploration (Alaska), Inc. 193-1320 / . Development D Exploratory D 3. Address: P.O. Box 196612 6. API Number / Anchorage, Ak 99519-6612 StratigraphicD Service ŒI 50-029-22401-00-00 7. KB Elevation (ft): 9. Well Name and Nu~er: 50.30 KB P2-46 8. Property Designation: 10. Field/Pool(s): ADL-034624 Point Mcintyre Field / ptmac Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): I Effective Depth MD (ft):IEffective Depth TVD (ft): Plugs (md): Junk (md): 9356 9275.21 9261 1 9133.1 None None Casing Length Size MD TVD Burst Collapse top bottom top bottom Conductor 80 20" 94# H-40 39 - 119 39.0 - 119.0 1530 520 Production 8333 9-5/8" 47# N-80 ~ 37 - 8370 37.0 - 8324.8 6870 4760 Production 16 9-5/8" 36# J-55 8370 - 8386 8324.8 - 8340.2 3520 2020 Production 955 9-5/8" 47# N-80 8386 - 9341 8340.2 - 9260.7 6870 4760 Surface 3670 13-3/8" 68# N-80 38 - 3708 38.0 - 3707.3 4930 2270 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 8874 - 8894 8810 - 8829.0 5.5 " 17 # L-80 35 - 8405 8927 8947 8861 8880.1 9087 9117 9015 9044.3 Packers and SSSV Type: Packers and SSSV MD (ft): 5-112" Baker SABL-3 Packer 8330 5-1/2" TRSV SSSV 2247 12. Attachments: Description Summary of Proposal ŒI 13. Well Class after proposed work: Detailed Operations Program D BOP Sketch D ExPloratoryD DevelopmentD ServiceŒl 14. Estimated Date for December 15, 2003 15. Well ~tatus after proposed work: Commencina Operation: 011 D GasD PluggedD AbandonedD 16. Verbal Approval: Date: WAG D GINJD WINJŒ] WDSPLD Commission Representative: Perpared by Garry Catron 564-4657. 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Andy Parker Printed Name Andy Parker Title Petroleum Engineer Signature ¡2.. It f\ . ¡? ~ \ú..r-- Phone 564-5766 11/20/03 Commission Use Only J Sundry Number: Conditions of approval: Notify Commission so that a representative may witness - -- -.... -- Sð.3-3,r'ø . ... Plug Integrity D BOP TestD Mechanciallntegrity TestD Location Clearan~ lJ t: I V I:: U Other: DE C 1 7 2003 I 0 I' I 0 ( Alaska Oil & Gas Cons. Commi.ssion Subsequent Form Required:- 'í A h - BY ORDER OF nc orage r ..'"") f - I Approved by: Origina' ~i~~~ By THE COMMISSION Date: / ~/ r¡ p3 ~t;A~lNE[) J¡~NI 2 @ '2~cr~~ r~"u / / -- 8Fl DEt t ít . 0 RIG I N A L Form 10-403 Revised 2/2003 ~j))1S SUBMIT IN DUPLICATE bp ( ... ,\If.'I1, -......~ ~...- ~~- ~~~ .~ -F"'-' .'I'~~I\~ ". To: Gary McBride/John Smart, Well Ops TL Date: May 29,2003 From: Kira Barton GPMA Petroleum Engineer Subject: P2-46 AdDerf Reauest , lOR: 500 bopd Cost Code: PMLP02046 Est. Job Cost: $35M Please add a total of 40 ft of new perforations in the LC2 and LC3 zones of P2-46. /' TVDe Job Comments 1. S D& T Use 3 3/8" Dummy gun 2. E Adperfs Please refer to attached procedure Tie-in Log: SWS CET-GR (10/24/93) Current Status: Injecting 17361 BWPD SW, 1131 WHP (5/26/03) /' Max Deviation: 16° at 8512' Minimum ID: 4.455" @ 8380' 5-1/2" OTIS XN NIPPLE Last TD Tag: 9205' SLM Corr (06/01/99) Last Wellwork: SIT/P Log (6/02199) Latest H2S reading: no record Gas Lift Design DGLV @ 4023', 8271' MD Short Joints 8400' - 8650' MD Well P2-46 has currently injected 79 MMBW. The well has not recorded any MI. The purpose of this job is to add perfs for increased water injectivity and MI placement. Please Derf the listed interval: Perf Interval Footage Gun Size Shot Density Orientation 9135' - 9165' 30' 3 3/8" 6 s.p.f. Random / 9180' - 9190' 10' 33/8" 6 s.p.f. Random If you have any questions or concerns regarding this program please call Kira Barton at (w) 564- 5445/ (c) 748-3541; or Andy Parker at (W) 564-5766/ (H) 694-2990. Thank you! cc: w/a: P2-46 Well File A. Parker K.Barton " \ ( lREE= CtN W§":[" HEA D = Ftv'C P2-46 SAFETY NOTES: A (;1UA TOR = SA KER C 'Ki? 8... EV = 53.5' BF. h.EV = _.--- KOP= 7118' Max Angle = 16@8512' e 5-1/2" OTIS TRSV SSSV, ID =4.562" Datum tv[) = 8919' Datum lVD = --8300' SS GAS LIFT MANDRELS 13-318" CSG, 68#, NT -80, ID = 12.415" TVD DEV lY Æ V LV LA TO; PORT I [)A. TE 4022 44 LBD T2 I 8230 16 LBD T2 Minimum ID = 4.455" @ 8380' OTIS XN NIPPLE 5-112" PARKERSWS NIP, ID =4.562" 9-5/8" X 5-1/2" BAKER SABL-3 A<R, ID = 4.75" 8361' --1 5-1/2" PARKERSWS NIP, D =4.562" 1 1 9-5/8" CSG, 47#, NT-80, ID=8.681" H 8370' 1 --1 5-1/2" OTIS XN NIP, ID = 4.555" I 9-5/8" CSG, 36#, J-55, ID = 8.921" 5-1/2" lEG, 17#, L-80, 0.0232 bpf, ID = 4.892" - 5-1/2" TLBING TAIL, WLEG. ID = 4.892" 1 1 8400' 1-1 8...MD TT LOGGED 05/30/94 I ÆRFORA TON SUMMARY REF LOG: DIUGR ON 09/27/93 ANGLE AT TOP PERF: 15@ 8874' Note: Refer to Production DB for historical perf data SIZE SR= INTERV A L Opn/Sqz DATE 3-3/8" 6 8874 - 8894 0 05/30/94 3-3/8" 6 8927 - 8947 0 05/30/94 3-3/8" 6 9087 - 9117 0 05/30/94 9260' 1 9-5/8" CSG, 47#. NT-80, ID = 8.681" 1 DATE REV BY COMMENTS DATE REV BY COMMENTS POINT MONlYRE UNIT 09/29/93 ORIGINAL COrvPLErION W8...L: P2-46 11/27/00 SIS-lsl CON\lERTEDTO CANVAS ÆRMITNo: 1931320 02/21/01 SIS-MD ANAL API No: 50-029-22401 -00 09/19/01 RN/KA K CORREGrIONS SEC14 T12NR14E3317.77 ÆL 274.7 FNL -'--"-"'.-_-_".0' --.--_.__._n._'"_- ......--...,-.......--.'"^., .--...--..--. ....- _._- -- '-'-"--'"'--' --.--- _n_"__"n'.""_,-'-".-.". -. --'''_._,_.".,.."._,~,. -- --.--..,...-...- .'''---'--'".''------------'--'--''"- .-.---.- BP Exploration (Alas ka) MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission THRU: Tom Maunder ~,.~ i~~.~ P.I. Supervisor . '~ TO: Camille O. Taylor (.~ DATE: July 2, 2002 Chair SUBJECT: Mechanical Integrity Tests BPX Pt. Maclntyre 2 P2-15, 16, 46 FROM: Jeff Jones PBU Petroleum Inspector Pt. Maclntyre Field NON- CONFIDENTIAL Packer Depth Pretest Initial 15 Min. 30 Min. we,,I P2-15 IType,nj.! S I T.V.D.] 88701TUbingI 12oo 11200 11200 11190 Ilntervall 4 P.T.D.I 1931540 ITypetestl P ITest'psil 2218 I Casingl. 80 I 23001 2290 I 2270 I P/F '1 'P' Notes: Pre-test pressures monitored 15 min. & stable~ Held press;test extra 15 min, & stabilized @ 2270. WeilI P2-16 Type lnj.I S I T.V.D. I 8744 I Tubingl 1200 I 1200 I 1200 I 1200 I Interval[ 4 P.T.D.I 1931230 TypetestI P ITestpsil 2186 I casingl 220 I 2260 I 2240 I 22401 P/F I P Notes: Pre-test pressures monitored 15 min. & stable. Well[ P2-46 I Typelnj.I S [ T.V.D. I 8286 I Tubing I 4200 '[ 4200 [ 4200 1"'4200 I Intel:vail 4 P.T.D.I 1931320 ITypetest] P J TestPsiI 2072 I CasingJ 50 I 2290] 2260I 2250I P/F I P Notes: Pre-test pressures monitored 15 min. & stable. F = FRESH WATER INJ. G = GAS INJ. S = SALT WATER INJ. N = NOT INJECTING M= Annulus Monitoring P= Standard Pressure Test R= Internal Radioactive Tracer Survey A= Temperature Anomaly Survey I= Initial Test 4= Four Year Cycle V= Required by Variance W= Test during Workover D= Differential Temperature Test O= Other (describe in notes) Test's Details July 2, 2002: I traveled to BPX's PM-2 Pad to witness 4 year MIT's on water injection wells P2-15, P2-16 and P2-46 in the Pt. Maclntyre Field. Roland Johnson was the BPX representative in charge of testing today and he performed the task in a safe and proficient manner. The pre-test pressures were monitored for 15 min. and were found to be stable. The standard annulus pressure test was then performed on each well, with all three wells passing the MIT's. The pressure test on well P2-15 was held an additional 15 minutes to further demonstrate integrity, and the test pressure stabilized at 2270 PSI. Summar3'.: I witnessed successful MIT's on BPX's water injection wells P2-15, P2-16 and P2-46 in the Pt. MacIntyre Field, PBU. M.I.T.'s performed: 3 Number of Failures: 0_ Total Time during tests: 3 Attachments: cc: MIT report form 5/12/00 E.G. MIT PBU Pt Mac 2-15,16~,~EDJ,/]~t~ 0 J. 200~ 7/18/2002 ,.S e o '1 o g ~ c a I 1'.'1 ,~ t e r" 'i' ,:.-'.~ '1 s I n v e n t o r" y F' E R H Z T D .& T A T D A T ,A._F' L !J '.E; -.I--DZFL6hS5.... 9298 'J 2 / 0 (~ / 'J 99 '3 .'.-} 3 -~. I 3 :?. ,,t,~ 07 9 ~ .-- I '~ 2 [.::, A '~ I... Y ~,'1 ELI L _- 93 '~ i 32 SURVEY ~:' Z.i',J A L 'i '1/01/'1997, I 1/(]'i/'199 '1 '1/ () i /19 9 !) 12/06/ 'J 99 :'.. ~!.", 5 f50 "' 9298 ~'/ 172"~9228 'i i/" 'l 9 / i 99 !!) 'i 2/06/" 'i 993 p..~: '717~. © .... ~.°.250 'l 2 ,/06,/I 9 .:?o 3 J 1/'i.9/'i993 0 ~!i ,/07 / i {it 9 1 'i/i9/'i.~;)93 ' ~ 'GF.:/C'Ai ..... l*: 8600 .... c, 298 93 .... 132 ..,'DL/CNL, ..... ~ 93~'132 FI/qAL Hb!D L? A r"e ri r' y d '¥ 'k c h s amp 'i e s r' e q u ~ r' e d ? y e s c_'~/" A n d r"e ,::: e :¥- d C 0 H H E N "J" S ALASK_ z : "IL AND GAS CONSERVATION''' 1MISSION REPOR 'oF SUNDRY WELL O, RATIONS t. Operations performed: Operation shutdown Stimulate X Plugging Perforate X Pull tubing AItercasing Repair we __ O~er X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 755' SNL, 4707' WEL, Sec. 8, T10N, R15E, UM. At top of productive interval 2507' SNL, 14' EWL, Sec. 7, T10N, R15E, UM. At effective depth At total depth 2540' SNL, 102' WEL, Sec. 12, T10N, R14E, UM. 5. Type of Well Development X Exploratory Stradgraphic Service - 6. Datum of elevation(DF or KB) 74 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 1-24A 9. Permit number/approval number 92-132 10. APl number 50 - 029-20860~01 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: . measured true vertical _ Effective depth: measured true vertical Plugs(measured) PBTD Tagged_~. 11457' MD (11/26/94~ 11665 feet 9140 feet · 11457 feet 8963 feet Junk(measured) Size Cemented 20" 1885# Poleset 13-3/8" 2688 sx CS Iii 8, 400 $× CS I 9-5/8" 500 sx G & 300 sx CS 11 7" 1538 sx G 4-1/2" Class G ORIGINAL- Casing Length Measured depth True vertical depth Conductor 79' 79' 79' Surface 2512' 2586' 2586' Production 10869' 10943' 8614' Liner 8634' 11042' 8674' Liner 823' 11665' 9140' Perforation depth: measured 11382-11392'; 11393-11410' true vertical 8903-8911'; 8912-8926' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, 13CR, Tbg @ 10813' MD; 3-1/2", 9.3#, 13CR, Tbg @10865' MD Packers and SSSV (type and measured depth) Baker SABL-3 Packer @ 10803' MD; 4-1/2", Camco TRDP-4A SSSV @2119' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See Attached 14. RECEIVED FEB -7 1995 Treatment description including volumes used and final pressure Alaska 0ii & Gas Cons. 8nmmi..i,,,. Representative Daily Average Produg-ti0n or Injection Data /l[rich0ra~9 Oil-Bbi Gas-Md Water-Bbl Casing Pressure Tubing Pressure Priorto well operation(_.,~h.~ ~ ~ O,3 ,~...~ ~..~7668MC_.. 1256 Subsequent to operation 193 1262 1135 856 205 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations __ 16. Status of well classification as: Oil X Gas Suspended, Sewice 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed U" T'rtle Engineering Supervisor Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE 1-24A DESCRIPTION OF WORK COMPLETED CTU CEMENT SQUEEZE FOR GAS SHUTOFF, PERF BREAKDOWN, & ROPE TREATMENT 3/25/94: MIRU & PT equipment. RIH w/CT to tag bottom, then pumped 6.5 bbls Gelled Sand Slurry containing a total of 900 lbs of 20/40 mesh sand, to place an isolation sand plug to 11436' MD, across the squeezed perforations located at: 11512 - 11532' MD (Z2) Ref. Log: BHCS 12/22/92. POOH w/CT. Rigged down. 3/29/94: An Acid Wash & CTU Cement Squeeze for Gas Shutoff, were performed as follows: MIRU & PT equipment. Loaded the wellbore w/Hot Seawater, then RIH w/CT & reciprocated an acid wash across the open perforations located above the sand plug at: 11382 - 11392' MD (Z3) Ref. Log: BHCS 12/22/92. Pumped 20 bbls 12% HCI w/10% Xylene @ 1.5 bpm, followed by 330 bbls Hot Seawater Flush, then switched to pumping cement to squeeze the perforations (above). Pumped 25 bbls of Latex Acid Resistive Cement & placed 7 bbls of cement behind pipe at 1500 psi maximum pressure & held for 45 minutes. Contaminated cement w/biozan & jetted cement from wellbore to 11180' MD. POOH w/CT, leaving a 200' cement plug above the perforations. Rigged down. 4/1/94 - 4/2/94: ~ RIH w/Underreamer & reamed 3.75" hole through the cement plug from 11193' to 11445' MD, then cleaned out sand plug to 11509' MD. 4/8/94: Reperforated: 11382 - 11392' MD (Z3) 6/26/94: POOH w/Underreamer. Rigged down. RECEIVED Ref. Log: BHCS 12/22/92. FEB - 7 1995 Alaska Oil & Gas Cons. Commission Anchora{~ MIRU & PT equipment. Pumped a fullbore Perforation Breakdown Treatment through the perforations (listed above), consisting of 200 bbis of 1% KCl Water @ 5.1 bpm, followed by 48 bbls of Gelled Diesel @ 8 bpm, followed by 21 bbis Xylene at 4 bpm, followed by 120 bbls 1% KCI Water at 10 bpm, followed by 30 bbls Meth Water at 7.1 bpm, followed by Shutdown. RD. 7/29/94: Added Perforations: 11393 - 11410' MD (Z3) Ref. Log: BHCS 12/22/92. 12/1/94 - 12/4/94: RIH w/CT & jetted a Hot Oil Treatment for paraffin removal, then displaced the tubing to 10750' MD w/N2, & set a Shear Disk in the SWN Nipple at 10853' MD, in preparation for a ROPE Treatment. Rigged down. 1 2/5/94 & 1 2/9/94: PT equipment to 9000 psi. Pumped 195 Mscf of N2 down the tubing'@ 4000 scf/m, to rupture the Shear Plug for a ROPE Treatment of the perforations (above). Ruptured the Shear Plug at 7480 psi. RIH & pulled the ruptured Shear Plug assembly (12/9/94). Rigged down. Returned well to production w/gaslift & obtained a valid production test. Note: Oil rate decreased by 196 BOPD, but the decrease in the gas rate provided an incremental rate benefit of 493 BOPD, resulting in a net oil benefit of 297 BOPD. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS il. Operations performed: Operation shutdown__ Stimulate__ Plugging __ Perforate Pull tubing _ Alter casing __ Repair well __ 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 412' SNL, 1290' EWL, Sec. 14, T12N, R14E At top of production interval 308' SNL, 1839' EWL, Sec. 14, T12N, R14E At effective depth 308' SNL, 1839' EWL, Sec. 14, T12N, R14E At total depth 275' SNL, 1963' EWL, Sec. 14, T12N, R14E Other x_._ 5. Type of Well: Development Exploratory Stratigraphic Service ORIGINAL 6. Datum elevation (DF or KB) RKB=35' 7. Unit or Property name Point Mclntyre 8. Well number P2-46 9. Permit number/approval number 93-132 / 94-203 10. APl number 500292240100 11. Field/Pool Prudhoe Bay/Point Mclntyre fee~ 12. Present well condition summary Total Depth: measured: true vertical: 9356 feet feet Plugs (measured) None. Effective Depth: Casing Conductor Surface measured: true vertical: Length Size 80' 20" 3668' 13-3/8 9261 feet Junk (measured) None. 91 83 feet Cemented Measured depth 260 sx Arcticset (approx.) 80' 1279 sx "E"/535 sx "G" 3708' True vertical depth 80' 3707' Intermediate 9304' 9-5/8" 762 sx Class "G" 9341' 9261' Liner Perforation depth: measured 8874o8894', 8927-8947', 9087-9117' true vertical 8810-8829', 8861-8880', 9015-9044', Tubing (size, grade, and measured depth) 5-1/2'' 17# L80 @ 8405' Packers and SSSV (type and measured depth) Pkr. @ 8330', TRSV SSSV @ 2247' R£C£1V£D 0il & 6as 00ns. 00remission Anch0r~ ._,¢ 13. Stimulation or cement squeeze summary Intervals treated (measured) N/A Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil~Bbl Gas-Mcf Water-Bbl Casing Pressure 4738 3211 0 1540 n/a n/a 4974 540 Tubing Pressure 849 1105 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations MFF 16. Status of well classification as: Oil Gas __ Suspended Service x SWI 17. I hereby certify that the fp.r-egping is true_.and//c/orrect to the best of my knowledge. S d Evan L Rael 2~.___~_ . -. ~tl bng~neer Form 10-404 Rev 06/15/88 Date September 22, 1994 SUBMIT IN DUPLICATE P2-46 Daily Report of Well Operations 06/17/94 08~27/94 O9111/94 P2-46 WIRELINE RAN STATIC BOTTOM HOLE PRESSURE SURVEY. P = 4069 PSIA @ 8800' SS. P2-46 STATE WITNESSED MIT COMPLETED, PASSED. P2-46 STARTED WATER INJECTION. RECEIVED S ED 2 7 i994 Alaska Oil & 6as Cons. Commission Anchor~ ? STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test OPERATOR: ArGo A/asks inc. FIELD I UNIT I PAD: Pt. ~ //=2 DATE: _- 8/27'__AH _ , !!l'~'"~ .......... ! '1'" ~m~o~ ~ ~' --"1 I"l i - IIi ~ ......... I...I ,.. ~_- ic°uu~: -. - I ...... Ii'"i''~ ~ .......... !- 1 ............ 3~-~ ~"-~" 'i ii ~-23 ! S,,,! ~ L ~,,, I f~STe I _Z ~/~.~/~ !...4.6! 2,213. __ 10:~I P i I I ' - I-- I '1 ~t ~ .... ! "1 7~~'7~ 7~ 7~ i I I i I COMMENTS: 'TUBING INJECTION FLUID: P = PRODUCED WATER INJ. S = SALT WATER INJ M = MISCIBLE INJ. I = INJECTION N" NOT INJECTING e - OpMItm' c - Dstalxme c - Tdp Rpl Fikl C - h'lspeclm' RECEIVED AnchorE .,~' ANNULAR FUJI)=. P.P.O. Omd. WELL TEST: DIESEL 6.8 _ I 0.36 Initial. GLYCOL i .0:00 ' 4- YeM 8ALT WATER ! 0.00 WorkovM DRILUNG MUD I 0.00 Other OTHER i 0.00 AOGCC REP SIGNATURE OPERATOR REP $1~TURE J29HH1BD.XL8 X STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS !1. Operations performed: Operation shutdown Pull tubing __ Alter casing __ Stimulate __ Plugging _ Pedorate Repair well __ 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 412' SNL, 1290' EWL, Sec. 14, T12N, R14E At top of production interval 308' SNL, 1839' EWL, Sec. 14, T12N, R14E At effective depth 308' SNL, 1839' EWL, Sec. 14, T12N, R14E At total depth 275' SNL, 1963' EWL, Sec. 14, T12N, R14E 5. Type of Well: Development _ Exploratory __ Stratigraphic _ Service X ORIGINAL 12. Present well condition summary Total Depth: Other X 6. Datum elevation (DF or KB) RKB=35' feet 7. Unit or Property name Point Mclntyre 8. Well number P2-46 9. Permit number/approval number 93-132 /94-203 0. APl number 500292240100 11. Field/Pool Prudhoe Bay/Point Mclntyre measured: true vertical' 9356 feet Plugs (measured) None. feet Effective Depth: measured: true vertical: Casing L e n g t h Size Conductor 80' 20" 3668' 13-3/8 Surface Intermediate 9304' 9-$/8'' 9261 feet Junk (measured) None. 91 83 feet Cemented Measured depth 260 sx Arcticset (approx.) 80' 1279 sx "E"/535 sx "G" 3708' True vertical depth 80' 3707' 762 sx Class "G" 9341' 9261' Liner Perforation depth: measured 8874-8894', 8927-8947', 9087-9117' true vertical 8810-8829', 8861-8880', 9015-9044', Tubing (size, grade, and measured depth) 5-1/2" 17# L80 @ 8405' Packers and SSSV (type and measured depth) Pkr. @ 8330', TRSV SSSV @ 2247' 3. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure N/A R EEEIVED SEt) 2 0 1994 Alaska Oil & Gas Cons. Cor~r~ission AnChor%~, 14. 15. Prior to well operation Subsequent to operation Attachments Copies of Logs and Surveys run Daily Report of Well Operations Representative [)aily Averaqe Production or Injection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure 4738 3211 0 1540 849 n/a n/a 4974 540 1105 MIT J16. Status of well classification as: Oil __ Gas Suspended correct to the best of my knowledge. 17. I hereby certify that the..,~oing i.s trj;e ~/rf~ Si,ned Evall L. Rael Form 10-404 Rev 06/15/88 Title Engineer Service x SWI Date September 19, 1994 SUBMIT IN DUPLICATE STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Meche~nical Integrity Te~t OPERATOR: FIELD I UNIT I PAD: Pi_. Mc/nfym / P2 , _ ._ DATE: .... 8/27/!N COMMENTS: _, &eTO 11,655_ P2-46 $ ,, Brine I 8~3,30' ' 05/8'/47fl/N'rSo , s_ 2,02'2 ~,e~o I 2, foo .[ ..2,.0~.. i 2,0co- 1 o:4s P boMMENTs: Brine ki Annufus l, fO. 5 ppg / .55 gra(~. , - - COMMENTS: 'TUBING INJECTION FLUID: P "" PRODUCED WATER INJ. 8 =' SALT WATER INJ M" MISCIBLE INJ. I = INJECTION N ' NOT INJECTING DIESEL GLYCOL .~-..] ~LT WA~R ~_..__~IU. ING MUD OTHER c - Opemlm* c. Ddaba~ c - Trip Rp4 FiI~ c. )nepeclnr P.P.G. Grad. WELL TE~T: ...68 ..J 0.35 , IntttM_ X ,, J 0.00 4- Year : - - _ ' '_o:0o Wo~kover, ~ ... J 0.00.. Other _ _ _ ! 0.00 AOGCC REP SIGNATURE OPERATOR REP SIGNATURE J29HH1BD.XLS _ JI STATE OF ALASKA ALASK~ OIL AND GAS CONSERVATION COMMISSION WI=! ! COMP! ETLON OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] ~ [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, inc. 93-132 3. Address 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-22401 4. Location of well at surface 9. Unit or Lease Name 412' SNL, 1290' EWL, SEC. 14, T12N, R14E ~.~.~;~ Point Mclntyre ~ ~ . .- . 10, Well Number At Top Producing Interval ii ~'~,-'~.~'~.~ ~ 308' SNL, 1839' EWL, SEC. 14, T12N, R14E~_~.~.~-'~ 11. Field and Pool At Total Depth ?~~ ~oint Mclntyre 275' SNL, 1963' EWL, SEC. 14, T12N, R14E 5. Elevation in feet (indicate KB, DF, etc.) ~6. Lease Designation and Serial No. KBE = 50.3' I ADL 34624 12, Date Spudded9/16/93 13. Date T,D, Reachedg/27/93 14' Date C°mp" Susp' °r Aband' 115' Water Depth' if °lfsh°r° 116' NO' Of COmpletiOns5/30/94 N/A feet MSL One 17, Total Depth (MD+TVD) 18, Plug Back Depth (MD+TVDI 19, Directional Survey ~20, Depth where SSSV set ~21, Thickness of Permafrost 9356' MD/ 9261' MD/9183' TVD YES [] NO []! 2248' feet MD ! 1750' (Approx.) 22. Type Electric or Other Logs Run DIFL/DEN/CNL/GR/TEMP 23. CASING, LINER AND CEMENTING RECORD SE'FI'lNG DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING I:~-CORD AMOUNT PULLED 20" 94~ H-40 Surface 80' 30" 260 sx Arcticset (Approx) 13-3/8" 68# NT-80 38' 3708' 16" 1279 sx "E"/535 sx "G" 9-5/8" 4 7# L-aO/NT80S 37' 9341' 12-1/4" 762 SX Class "G" 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD1 PACKER SET IMD) Gun Diameter 3-3/8" 6 spf 5-1/2", L-80 8405' 8330' MD TVD 8874'-8894' 8810'-8829' 8927-8947' 8861'-8880' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 9087-9117' 9015'-9044' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) 7/17/94 I Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESIZE IGAS-OIL RATIO I ['EST PERIOD Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF ~ATER-BBL OIL GRAVITY-APl (corr) Press, 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit ~UG - 5 1994 Alaska 0il & Gas Cons. Commission Anchorage Submit in duplicate -'orm 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOL~ MARKERS FORMATION TESTS NAME .... Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. HRZ 8614' 8559' Kalubik 8852' 8 788' ' Kuparuk 8863' 8799' RECEIVED -,5 1994 Alaska Oil & Gas Cons. Commission Ancfl0raue 3'1. LIST OF A'CI'ACHMENTS .... 32. I hereby cert~~true.~,~ and correct to the best of my knowledge S/~/1~ Signed .... Title ..Drilling Engineer Supervisor Date .L~'__ . INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21'. Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspended Alter casing ~ Repair well Chan~e approved pro, ram x 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 412' SNL, 1290' EWL, Sec. 14, T12N, R14E At top of production interval 308' SNL, 1839' EWL, Sec. 14, T12N, R14E At effective depth 308' SNL, 1839' EWL, Sec. 14, T12N, R14E At total depth 275' SNL, 1963' EWL, Sec. 14, T12N, R14E Operation Shutdown __ Re-enter suspended well Plugging __ Time extension __ Stimulate Pull tubin~ Variance Perforate Other 5. Type of Well: Development Exploratory Stratigraphic Service x ORIGINAL 6. Datum elevation (DF or KB) RKB=35' 7. Unit or Property name Point Mclntyre 8. Well number P2-46 9. Permit number 93-132 10. APl number 500292240100 11. Field/Pool Prudhoe Bay/Point Mclntyre feet 12. Present well condition summary Total Depth: measured: true vertical: 9356 feet feet Plugs (measured) None. Effective Depth: Casing Conductor Surface Intermediate measured: true vertical: Length 80' 3668' Size 20" 13-3/8'' 9304' 9-s/8'' 9261 feet Junk (measured) None. 91 83 feet Cemented Measured depth 260 sx Arcticset (approx.) 80' 1279 sx "E"/535 sx "G" 3708' True vertical depth 80' 3707' 762 SX Class "G" 9341' 9261' Liner Perforation depth: measured 8874-8894', 8927-8947', 9087-9117' true vertical 8810-8829', 8861-8880', 9015-9044', Tubing (size, grade, and measured depth) 5-1/2'' 17# L80 @ 8405' Packers and SSSV (type and measured depth) Pkr. @ 8330', TRSV SSSV @ 2247' JUL ?- 8 ~994 Oit & Gas Cons. Commission Anchorage 13. Attachments Description summary of proposal x Convert well from Producer to Water Injection. Detailed operation program __ BOP sketch 4. Estimated date for commencing operation August 1, 1994 16. If proposal was verbally approved Name of approver 15. Status of well classification as: Oil __ Gas Suspended Date approved Service Water Injector 17. I here~'~berti~ th~a/J~'~ brego'ing is true and correct to the best of my knowledge. S igned"/"~"-'~rc'/"-£"~'"George'7-) ~'2"~"¢F'~'"~ K. Phillips Title GPMA Sr. Engineer Date FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity __ BOP test Location clearance __ Mechanical Integrity Test ~ Subsequent for required 10-/f Original Signed By ADDroved bv order of the Commission David W. Johnston Form 10-403 Rev 06/15/88 GommissionCr Approved Oopy Returned IApproval No. Date SUBMIT IN TRIPLICATE Attachment I Conversion to Water Injection Point McIntyre P2-46 ARCO Alaska requests approval to convert Well P2-46 from an oil producer to a water injector. This well will be operated as a Class II UIC well in compliance with Area Injection Order 4A. Water will be injected for the purpose of enhanced recovery into the Kuparuk interval between the depths of 8874' and 9117' measured depths This interval correlates with the strata found in ARCO's Point Mclntyre Well No. 11 between the measured depths of 9908' - 10665' as authorized in Rule 1 of this injection order. A Mechanical Integrity Test will be performed before injection is initiated and every four years thereafter, in compliance with Rule 6 of this order. This well's injection volumes, average injection pressure, and average annulus pressure will be reported to the AOGCC monthly. RECEIVED JUL 2 8 1994 Alaska Oil & Gas Cons. Commission Anchorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Wr=LL COMPL ION OR RI=COMP LI=TION RI:::PORT AND LOll 1. Status of Well Classification of Service Well OIL [] GAS [] St.ISPEi'~[)ED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, lnc.0 r-,,,-,i 93-132 3. Address ~'~ i ~ 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 5o- 029-22401 4. Location of well at sudace ~ ...... 9. Unit or Lease Name 412'SNL'1290'EWL'SEC'14'T12N'R14Ei"O~¥'FL~TIO~'~At Top Producing Interval I .~,x/~,..~7~ :~ ~.I'~7'~',~-x-~,,~'A [~'~,TE~ J I~~:''' 10.p2.46P°intMc/ntyrewell Number 308' SNL, 1839' EWL, SEC. 14, T12N, R14E 275'SNL, 1963'EWL, SEC. 14, T12N, R14E 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 50.3' I ADL 34624 12. Date Spudded 13. Date T.D. Reached ~4. Date Comp.~ Susa). or Aband. 115. Water Depth, it offshore 116. No. of Completions 9/16/93 9/27/93 ~ ~ f"~O[~L~I N/A feet MSL'1 One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost 9356' MD/ 9261' MD/9183' TVD YES [] NO []'J 2248' feet MD/ 1750' (Approx.) 22. Type Electric or Other Logs Run DIFL/DEN/CNL/GR/TEMP 23. CASING, LINER AND CEMENTING RECORD S~ DEPTH MD CASING SIZE WT. PER FT. GRADE TOP Bo'rroM HOLE SIZE CEMENTING RECORD AMOUNT PULED 20" 94~ H-40 Surface 80' 30" 260 sx Arcticset (Approx) 13-3/8" 68# NT-80 38' 3708' 16" 1279 sx "E"/535 sx "G" 9-5/8" 47# L-aO/NT80S 37' 9341' 12-1/4" 762 SX Class "G" 24. Pedorations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET(MDI PACKER SET(MDI Gun Diameter 3-3/8" 6 spt 5-1/2", L-80 8405' 8330' MD TVD 8874'-8894' 8810'-8829' 8927'-8947' 8861'-8880' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 9O87'-9117' 9015'-9044' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Not on production N/A Date of Test Hours Tested F:)RODUCT1ON FOR OIL-BBL GAS-MCF WATER-BBL C HOKESIZE IGAS-OIL RATIO I rEST PERIOD Flow Tubing Casing Pressure CALCULATED OIL-BBL !GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. R£CF. IVF. D dUiq 1 5 1994 .,,,~.-.~ Oil & Gas Cons. Commission Anchorage Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINLIEDON REVERSE SIDE 29, 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. HRZ 8614' 8559' Kalubik 8852' 8788' Kuparuk 8863' 8799' RECEIVED ~k!aska Oil & (~as Goss. Cornrnissiort AnChorage 31. LIST OF ATTACHMENTS 32. I hereby ~~~ certify t at the foregoing is true and correct to the best of my knowledge Signed T it le Drilling Engineer Su.oervi$or Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: P2-46 BOROUGH: NORTH SLOPE UNIT: POINT MCINTYRE FIELD: POINT MCINTYRE LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 09/16/93 07:00 SPUD: 09/17/93 04:30 RELEASE: OPERATION: DRLG RIG: POOL 7 WO/C RIG: POOL 7 09/17/93 ( 1) TD: 220' ( 0) 09/18/93 (2) TD: 2080' (1860) 09/19/93 ( 3) TD: 3715'(1635) 09/20/93 ( 4) TD: 3715' ( 0) 09/21/93 (5) TD: 5800' (2085) 09/22/93 ( 6) TD: 6425' ( 625) 09/23/93 (7) TD: 6903' ( 478) 09/24/93 (8) TD: 7730' ( 827) POOH MW: 0.0 VIS: 0 MIRU. N/U DIVERTER. TEST SAME. OK. RIG ACCEPTED @ 19:00 HRS. 09/16/93. P/U BHA. SPUD WELL @ 04:30 HRS. 09/17/93. DRILLING FROM 80' TO 220'. POOH. DRLG. MW: 9.4 VIS:104 POOH. RIH. DRLG F/ 220'-1471'. CBU. SHORT TRIP. DRLG F/ 1471'-2080'. RUN CSG. MW: 9.7 VIS: 86 DRLG F/ 2080'-3715' CBU. SHORT TRIP TO 1400' CBU. POOH. L/D BHA. RIH W/ 13-3/8" CSG. RIN W/BHA #2 MW: 8.5 VIS: 0 RIH W/90 JTS 13-3/8" CASING. CIRC & ANNULUS VOLUME 800 BBL. CMT 13-3/8" CASING W/1279 SX PERMAFROST "E", 350 SX CLASS "G" DISPLACE W/555 BBL OF MUD. BUMP PLUG W/2000 PSI. OK. CIP @ 1500. L/D CEMENT HEAD & LANDING JT. N/D DIVERTER STACK. TOP JOB W/185 SX OF PREMIUM "G". N/U FMC SPEED HEAD. N/U BOPE. CHANGE OUT BOP VALVE ON TOP DIRVE. TEST BOPE. P/U BHA. RIH. DRLG. MW: 9.5 VIS: 36 RIH TO 3522' CIRC. TEST CSG. OK. DRLG FC, CMT, FS, 10' NEW HOLE. CIRC. LOT (15.6 PPG EMW). DRLG F/ 3725'-5194'. CBU. SHORT TRIP TO 3707' DRLG F/ 5194'-5800' DRLG. MW: 9.3 VIS: 36 DRLG TO 6033'. CBU. POOH. CHANGE BHA, BIT. RIH. DRLG TO 6425'. DRLG. MW: 9.3 VIS: 41 DRLG TO 6739' CIRC. POOH. CHANGE MOTOR, BIT. RIH. DRLG TO 6903' DRLG. DRLG TO 7730' MW: 9.5 VIS: 45 09/25/93 (9) TD: 8537' ( 807) DRLG. MW: 9.7 VIS: 55 DRLG TO 7745' CBU. SHORT TRIP TO 6700' DRLG TO 7994' CBU. POOH. CHANGE BIT, BHA. RIH. DRLG TO 8537' RECEIVED JUN i 5 !99/+ ,,,, .... ~ .... Oii& Gas Cons. Commission Anchorage WELL · P2-46 OPERATION: RIG : POOL 7 PAGE: 2 09/26/93 (10) TD: 9134' ( 597) POOH. DRLG TO 8768' CBU. POOH. MW:10.0 VIS: 50 CBU. SHORT TRIP 10 STDS. DRLG TO 9134'. 09/27/93 (11) TD: 9300' ( 166) 09/28/93 (12) TD: 9356'( 56) MW:10.0 VIS: 44 POOH. CHANGE BHA, BIT. RIH. REAM TO BTM. DRLG TO 9300'. TD WELL @ 16:30 HRS, 9/26/93. CBU. SHORT TRIP 10 STDS. CBU. POOH. R/U ATLAS. LOG RUN: DIFL/ZDL/CN/GR. POOH. MW:10.0 VIS: 44 LOG RUN: DIFL/ZDL/CN/GR. R/D ATLAS. RIH W/ BIT, BHA. DRLG TO 9356'. TD WELL @ 18:00 HRS, 9/27/93. CIRC. SHORT TRIP 10 STDS. POOH. L/D BHA. 09/29/93 (13) TD: 9341 PB: 0 L/D DP. MW:10.5 NaCl L/D BHA. TEST BOPE. RIH W/ 9-5/8" CSG. CIRC. PUMP 162 BBLS LEAD CMT. DISP W/ MUD. BUMP PLUG. TEST CSG. OK. SET PACKOFF. TEST SAME. OK. TEST BOPE. RIH TO 2200'. DISP W/ DIESEL. L/D DP. 09/30/93 (14) TD: 9341 PB: 0 SIGNATURE: RIG RELEASED. MW:10.5 NaC1 L/D DP. RIH W/ 1 JTD TBG, HGR. LAND TBG. N/D BOPE. N/U DRY HOLE TREE. RIG RELEASED @ 16:00 HRS, 9/29/93. MOVE RIG TO NK-22. DATE: (dri lin~ superintendent) RECEIVED JUN 175 !994 A!ss?.a Oi; & Gas Cons. Commission Anchorage BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: P2-46 BOROUGH: NORTH SLOPE UNIT: POINT MCINTYRE FIELD: POINT MCINTYRE LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 01/27/94 10:00 SPUD: RELEASE: OPERATION: DRLG RIG: DOYON 14 WO/C RIG: DOYON 14 01/28/94 ( 1) TD: 9341 PB: 9260 LAND TBG MW: 0.0 ACCEPTED RIG 1-27-94 @ 1000 HRS. ND, NU BOP. RU & TEST BOPE. CIR OUT DIESEL. POH. RU & RUN TBG. LAND TBG. 01/29/94 ( 2) TD: 9341 PB: 9260 FINAL REPORT MW: 9.8 CaBr ND BOPE AND NU TREE AND TEST SAME. PULL BPV. RU HOT OILER. DISPLACE 310 BBLS DIESEL DOWN TUBING. RD HOT OILER. DROP BALL. PRESSURE UP ON TUBING TO 4000 PSI - TEST GOOD. PRESSURE TEST ON ANNULUS TO 3500 PSI. HAD 4200 PSI ON TUBING. BLED PRESSURE OFF. PRESSURED UP ON TUBING TO 4000 PSI FOR 30 MINUTES. BLEED TUBING PRESSURE TO 1500 PSI. PRESSURE TEST ANNULUS TO 3500 PSI F/30 MIN. GOOD TEST. SET BPV. SECURE TREE. RELEASE RIG AT 20:00 HOURS ON 1/28/94. PREPARE TO MOVE RIG TO P2-49. AOGCC REP: DOUG AMOS WITNESSED PACKER/ANNULUS TEST. SIGNATURE: (drill£ng~'ng ~i uperintendent) DATE: REC£JVED Cons. Commission Anchorag~ Date: Subject: From: To' ARCO Alaska Inc. G.~eater Point Mclntyre Engineerii~, June 6, 1994 Transmittal Number ARCO Alaska, Inc. Bob Crandall AC)GCC 3001 Porcupine Drive Anchorage, AK 99501 733 v,uhi~lS$lO]"l Ancnora~ee The following and your cooperation in maintaining confidentiality is appreciated: P2-0~ v~INAL DISKETTE: Sub-Surface Directional I 5-24-94 9q- 5gl Surv___ey (MWD) P.~ ,/FINAL DISKETTE: ESS MultiShot I 5-26-94 Greater Point Mclntyre Area data are enclosed. This information is confidential Sperry Sun Sperry Sun P2-1--~2 P2-12 P2-12 P2-12 /FINAL TAPE: Open Hole Edit/CDR/CDN-2 Bit runs w/QR0 Process (LDWG) w/LIS Verify / FINAL LOG: CDN (Not depth adjusted) /~INAL LOG: CDR ENHANCEMENT (Not depth adjusted) / FINAL LOG: CDR (Not depth adjusted) comp 8-31-93 Schlumberger comp 8-31-93 Schlumberger comp 8-31-93 Schlumberger comp 8-31-93 Schlumberger P2-21t /Final Log: CBT-GR / Final Log: Ultra Sonic Imager/Cement & Corrosion 1 5-11-94 Schlumberger 1 5-11-94 Schlumberger P2-23 P2-23 P2-23 P2-23 Final Log: Ultra Sonic Imager/Cement & Corrosion /'Final Log: CBT/GR /'Final Log: GCT ~'mal Diskette: Sub-Surface Directional Survey (GCT) ~ 1 5-12-94 Schlumberger 1 5-12-94 Schlumberger 5-12-94 Schlumberger 1 5-12-94 Schlumberger ,_,,,tab, escripfion '/FINAL LOG: . .,'orating Record (3 3/8" HSD-6SPF) / /"FINAL LOG: Perforating Record (3 3/8" HSD-6SPF) /FINAL LOG: Perforating Record (3 3/8" HSD-6SPF) ...... /FINAL LOG: Perforation Record/GR/Collar Locator Date Run Company 5-30-94 Schlumberger : , · 5-28-94 · Schlumberger - 5-29-94 Schlumberger 5-27-94 Schlumberger Please sign ,d ~.] and return Elizabeth R. Barker, ATO-415 ARCO Alaska, Inc. P.O. Box 100360 Anchorage, Alaska 99510-0360 Transmittal Number: 733 Page: 2 'MEMORANDUM State of ~" ska Alaska Oil a~d Gas Conservation Commission TO: David Joh ns.~l~, DATE: Chairma~ THRU: Blair Wondzell,~'-b~ FIJ..E NO: P. I. Supervisor FROM: Doug Amos,~ SUBJECT: Petroleum Inspector January 28, 1994 j2gha2bd.doc Mech. Integrity Test Doyon 14 Arco Pt. Mclntyre P2 - 46 Pt Mclntyre Field ff-~_j~,/,, Friday, January- 28, 1994: ! traveled to Arco's Pt. Mclntyre P2-46 injection well and witnessed the initial Mech. Integrity Test on Doyon Rig No. 14. As the attached AOGCC Mech. Integrity Test Report indicates the well passed. The well was tested in accordance with all applicable AOGCC regulation and Area Injection Orders. Summary: Witnessed the initial Mech. Integrity Test on Arco's Pt. Mclntyre P2-46 injection well. Attachment J2GHA2BD.XLS OPERATOR: Arco Alaska Inc. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test FIELD I UNIT I PAD: Pt Mclntyre / 2 DATE: 1/28/94 P2-46 COMMENTS: COMMENTS: COMMENTS: COMMENTS: COMMENTS: Diesel 8,330 8,405 9 5/8" / 47 # / L-80 The 5.5 Tubing was tested with 4,000 psi prior to the Annulus test. III I, II 1,500 500 500 500 2082.5 0 3,450 3,350 3,260 1815 II II *TUBING INJECTION FLUID: P = PRODUCED WATER INJ. S = SALT WATER INJ M = MISCIBLE INJ. I = INJECTION N = NOT INJECTING Distribution: orig - Well File c - Operator c - Database c - Trip Rpt File c - Inspector ANNULAR FLUID: DIESEL GLYCOL SALT WATER DRILLING MUD OTHER P.P.G. Grad. 6.8 0.35 AOGCC REP SIGNATURE OPERATOR REP SIGNATURE J2GHA2BD.XLS WELL TEST: Initial 4 - Year Workover Other Dou(7 Amos Dink Hiem FI-051 (Rev. 3~93) · . ! ~ STATE OF ALASKA ALA~SKA OIL AND GAS CONSERVATION COMMI~:~,~N APPLICATION FOR SUNDRY A PRO r r 1. Type of Request: Abandon__ Suspend__ Opera~on Shutdown __ Re-enter suspended well __ ['~~ .x~/q Alter casing __ Repair well __ Plugging __ Time extension ~ Stimulate __ Change approved program x Pull tubing __ Vadance~ Perforate__ Other 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KI~ ARCO Alaska, Inc. Development__ feet Exploratory ~ 3. Address StratJgraphic__ 7. Unit or Property name P. O. Box 196612, Anchorage, Alaska 99519-6612 Service x Point Mclntyre 4. Location of well at surface 8. Well number 412' SNL, 1290' EWL, SEC. 14, T12N, R14E P2-46 At top of productive interval 9. Permit number 308' SNL, 1839' EWL, SEC. 14, T12N, R14E 93-.t.23 J ~ At effective depth 10. APl number 281' SNL, 1939'EWL, SEC. 14, T12N, R14E 50- 029-22397 At total depth 11. Field/Pool 275' SNL, 1963' EWL, SEC. 14, T12N, R14E Point Mclntyre 12. Present well condition summary Total depth: measured 9356 feet Plugs (measured) true vertical 9272 feet Effective depth: measured 9261 feet Junk (measured) true vertical 9183 feet Casing Length Size Cemented Measured depth True vertical depth Structural Co nd ucto r 80' 20" 260 sx Arcticset 80' 80' Surface 3671' 13-3/8" 1279 sx "E"/535 sx "G" 3708' 3707' Intermediate 9334 9-5/8" 762 sx Class "G" 9341' 9258' Production Liner Perforation depth: measured None R E C E IV E D true vertical i,-~ jAr~ '1 'J 199~ Tubing (size, grade, and measured depth) None S'_ac',~a Oil & (~as Cons. Commission Anchorage Packers and SSSV (type and measured depth) None 13. Attachments Description summary of proposal × Detailed operations program ~ BOP sketch ~ 14. Estimated date for commencing operation 15. Status of well classification as: 1/13/94 16. If proposal was verbally approved Oil ~ Gas ~ Suspended ~ Name of appro,ver/, Date approved Service Water Injector 17. I hereby cer~f¢~tha~ the foregping is true and co.r~ect to the best of my knowledge. '. Title Drilling Engineer Supervisor Date ~ ~ ? Signed~ ~ y-!' COMMISSION USE ONLY ' Conditions of approval: Notify'Commission so representative may witness I Approval No.? ~ _.._~ d ? Plug integrity ~ BOP Test~ Location clearance ~ Mechanical Integrity Test Subsequent form required 10-/d ~7' Original Signea By Approved by order of the Commission Davir W, ,Inhqst0n Commissioner Date ~//,,,/~ ~ Form 10-403 Rev 06/15/88 SUBMI~ I , , , , , . . , , 10. 11. 12. , P2-46 Operations Summary Change of approved program to include the running of tubing and completion. This well was permitted without tubing. MIRU drilling rig. Spud well and ddll 16" hole. Nudge well from 0° to 3° and back to 0° between 500' md and 1300' md. Continue drill 16" straight hole to 3700' md/tvd. Set 13-3/8" casing and cement same. Test casing to 3000 psi for 30 minutes. Nipple up BOPs and test same to 5000 psi. Pick up 12-1/4" BHA and drill 10' of new hole and perform leakoff test. Kick off at +_6676' MD and build hole angle to 15°, 108.73° azimuth. Continue drilling to 9220' md / 9293' tvd. Run wireline open hole logs. Set 9 5/8" L-80 casing and cement same. RIH and test casing to 4000 psi f/30 min. Displace with 10.5 ppg brine. POOH LDDP. Secure well. Release ddlling dg. MIRU completion rig. Run 5-1/2", 17#, NT-80, NSCC completion assembly. ND/NU. Freeze protect the annulus to 2000' md and leave tubing string full of diesel. Set packer. Test tubing/annulus. Secure well. Release rig. POST RIG WORK Run cement bond log. RECEIVED JAN i 0 !99~ Ai:.~t~;k~ O[i& Gas Cons. Commission Anchorage TREE: 6" 5M CARBON TREE WELLHEAD: 13-5/8" 5M FMC universal P2-46 RT-GL = 41' GL-SL = 10.9' DIESEL TO 13-3/8" 68 ppf NT-80 I 3708 I BTC KOP: 6369' Max angle: 16.3 degrees @ 8512' 5-1/2" 17 ppf L-80 NSCC TUBING ID: 4.892" CAPACITY: 0.02325 BBL/FT 5-1/2" OTIS TR SSSV 2250' MD; 2250' TVD O.5 ppg NaCl/NaBr GAS LIFT MANDRELS (Ot is 5-1/2" x 1-1/2" LB w/dummy) No MD(BKB) TVD(BKB) I 4000' 4000' 2 8265' 8224' 9-5/8" 47 ppf NT- 80S NSCC 6402'- surface 5-1/2 .... X" Nipple (4.562" ID) 9-5/8" x 5-1/2" Pkr TIW HBBP 5-1/2 .... X" Nipple (4.562" ID) J PERFORATION SUMMARY: Ref Log: Size Interval SPF Open/Sqzd .~TD I 9300' ! 9-5/8" 47ppf L80 BTC Mod ! 034'1' I WELL TD = 9356' 5-1/2 .... XN" Nipple (4.455" ID) 5-1/2" WLEG DATE 11/9/93 REV. BY DKC COMMENTS POST DRILLING Point Mclntyre_ Well: P2-46 APl NO- 50-029-22401 Prudhoe Bay Drilling. I RECEIVED dAi~/ 'i 0 i~94 0i[ & 6as CoJ-ls. Oo~'~mission Date: Subject: From: December 2, 1993 Transmittal #367 ARCO Alaska Inc. ARCO Alaska, Inc. Lisburne/Point McIntyre Engineering ? - · To: Bob Crandall AOC~C 3001 Porcupine Drive Anchorage, AK 99501 The following Point Mckntyre data are enclosed. This information is confidential and your cooperation in maintaining confidentiality is appreciated. Well Log 1 blueline 1 sepia Ii'LO -- l,~TqL~ 5" P1-01 Perforation Record 2-1/8'' BH ENERIET P1-05 -'Static Pressure Survey/~RESS/TEMP / GR/CCL) Run # Run Date Company ~"'~/2'~I~ff~-lVLWD Vet//'Enhanced Resistivity .7.---'~ ~~Z'LWD True Vertical Depth CDR '"'Perforation Record 3-%8" HSD -4lB '~oo-tt~7..5o) $ '~ 1 · /'Perforation Record 3-%~HSD-4lB ~ooo---_t0~7o~ ~;" 1 ,,"Data FracLog ~17oo-'t525o~ 5'~ 1 '"Cement Evaluation Log (CET-GR) '~6vo-lv4z.5, 5" 1 ~2ement Bond Log (CBT-GR) ~0-10~0o $" 1 . ~"Cement Evaluation Log (CET-GR) v~72-%~0~ ~, 1 IPl-17 '5~6\ P1-17 ~5.-/2.~JP2-16 '~ ~P2-16 1 11/34/93 Sdn/uml:ergsr 1 ~z't00" 93~''Sdflumh~r 7/'18-28/93 7/18-28/93 1/26/93 11/29/93 11/o7/93 o/24/93 10124193 0/24/93 q~~P2-46 P2-46 /Cement Bond Log (CBT-GR) ~t-/z-qzzS, 5" I 10/24/93 '~t'?~P2-57 [ ,'Compensated Neutron Log (2.5 CNT-D/CH) - 1 '1~;14/93 /~P2-60 :k~:Perforation Record (3-%8" Gun 4lB I-1~) 7.$t1~-15000,11/14/935 ,, q~_~P2-60 ,.'Static Pressure Survey fPRESS/TEMP/GR/CCL)~ 11718/93 ~P2-60 -Perforation Record 32/~" -41B HJII ~,.oot%.? lzqq¢, 5"1 11/14/93 PLEASE SIGN ONE COPY AND RETURN Transmittal #367 (AC)GCC) Page2 I Well Tape/Diskette w/verification ot~ '~ 5~'~a Run # Run Date Comply ~T~I C~Data ~ 2 ST Bit R~s (w/Offg. Weg) ~ ~_ 7/18/93 Pl-t6 Du~ PropResis/Neu/Dens/GR -Depth S~ed°~ 6~z~ .~%~%- o~ ~25 3/29/93 P1-21 Du~ PropResis/Neu/Dens/CR-Depth Sh~e~ 3~ P2-12 Final MWD z<rqcttc~. - 8/31/93 Schlum~ P2-16 DIFL/GR, G'q/ZDL/GR (LDW~ Tape & Disk'~ette) - , 9/13/93 Atlas P2-16 Final MWD ~c~ ~c~s¢_ o~ ¢ ~zq 7~-los~ 9/11/93 ~~~ P2~ 0¢ D~/CN/~L/GR (LDWG T~e & Disk~e) ~c~5 - 9/27/93 Atlas P2~ FinM ~D LC , ~v~ e ~s~ 5%b ~6-Ozq8 - 9/26/93 ~~~ Laura S. Lahrson, ATO-409 ARCO Alaska, Inc. P.O. BOX 100360 Anchorage, Alaska 99510-0360 .. Transmittal #367 PLEASE SIGN ONE COPY AND RETURN Transmittal #361 (AOGCC) Page 2 Log Well Title 1 sepia P1-21 v/Integrated Formation Log-MD P1-21 V' Integrated Formation Log-TVD P1-21 ~/Engineering Parameters-MD P1-21 /Pressure Data Log-MD Run # Run Date - 4/30-5/5/93 - 4/30-5/5/93 - 4/30-5/5/93 - 4/30-5/5/93 P2-06 v'Z-Densilog/Cmpnstd NELr~ON/GR/Caliper 1 P2-06 ~/Dual Laterolog/Gamma Ray/SP 1 P2-06 ,/Sub-Sea Vertical Depth (Single Shot Data) 1 P2-06 ,/Borehole Profile 1 8/17/93 8/17/93 8/17/93 8/17/93 P2-16 '/'Z-Densilog/Cmpnstd NEUTRON/GR/Caliper 1 P2-16 v'Dual Induction Focused Log/Gamma Ray 1 P2-16 v/Sub-Sea Vertical Depth (Multi Shot Data) 1 P2-16 ,,/BorehOle Profile 1 9/13/93 9/13/93 9/13/93 9/13/93 P2-46 P2-46 P2-46 P2-46 d'Z-Densil°g/Cmpnstd NEUTRON/GR/Caliper 1 v/Dual Induction Focused Log/Gamma Ray 1 ~/Sub-Sea Vertical Depth (Directional Drlg Data) 1 ,/Borehole Profile 1 9/27/93 9/27/93 9/27/93 9/27/93 Please and return to: Laura S. Lahrson, ATO-409 ARCO Alaska, Inc. P.O. BOX 100360 Anchorage, Alaska 99510-0360 Company Exlog Exlog Exlog Exlog Atlas Atlas Atlas Atlas Atlas Atlas Atlas Atlas Atlas Atlas Atlas Atlas Transmittal #361 RECEIVED 'Alaska 0ii & ~as Oons. Oommission Anchorage PLEASE SIGN ONE COPY AND RETURN Transmittal ~359 (AOGCC) Page 3 Report Well P1-04 P1-05 P1-08 P1-13 Pl-17 P1-21 Title Sub-Surface Directional Survey (2 copies)v/ Sub-Surface Directional Survey (2 copies) Final Well Report Final Well Report Final Well Report"' Final Well Reportv- Date 7/28/93 8/12/93 7119-811193 6/1-11/93 4/12-16/93 4/30-5/5/93 Company Schlumberger Schlumberger Exlog Exlog Exlog Exlog Please and return to' Laura S. Lahrson, ATO-409 ARCO Alaska, Inc. P.O. BOX 100360 ' Anchorage, Alaska 99510-0360 Please note: The Exlog blueline logs are located within the Final Well Report binders. Transmittal #359 PLEASE SIGN ONE COPY AND RETURN ,'ransmittal ~359 (AOGCC) ..... ' · Page 2 Log Well Title Run # Run Date Company 1 blue line P1-21 Integrated Formation Log 4/30-5/5/93 Exlog ~:;t.O-- lt~%5', P1-21 Integrated Formation Log ~t -_ 4/30-5/5/93 Exlog ~x:>o- i:)''/'P1-21 Engineering Parameters ~ - .4/30-5/5/93 Exlog ~".~ ~-- P1-21 Pressure Data Log -MD-'"' - 4/30-o/5/93 Exlog I J5 ~ -- P2-06 Z-Densilog/Cmpnstd NELrrRON/GR/Caliper ~"> aT5% t1~oo- 8/17/93 Atlas P2-06 Dual Laterolog/Gamma Ray/SP ' 1 8/17/93 Atlas o?c5'I /Iqoo- P2-06 Sub-Sea Vertical Depth (Single Shot Data)--.xl 8/17/93 Atlas P2-06 Borehole Profile 1 8/17/93 Atlas ~'-5 I~-9-t' 1 tq0o- , Itq0t~- t~5~ ~ locrT. 0-.9/13/93~05~ Atlas P2-16 Z-Densilog/Cmpnstd NEUTRON / GR/ Caliper /7 ~ --~ P2-16 Dual Induction ~ocused Log/Gamma Ray 1 9/13/93 Atlas ,-~ P2-16 Sub-Sea Vertical Depth (Multi Shot Data) 1 9/13/93 Atlas 1~-2" P2-16 Borehole Profile 1 9/13/93 Atlas P2-46 Z-Densilog/Cmpnstd NE~ON/GR/Caliper &~[~_~ 9/27/93 Atlas P2-46 Dual Induction Focused Log/Gamma Ray 1 9/27/93 Atlas P2-46 Sub-Sea Vertical Depth (Directional Drlg Data) ~ 1 9/27/93 Atlas P2-46 Borehole Profile 1 9/27/93 Atlas ~>B-2"~ ~o-~,~ Diskette/Tape (w/verification listing) Well Title Run # Rrm Date Company GCT diskette-Complete Calc. V' 1 7/28/93 Schlumberger GCT diskette-Complete Calc.,,," 1 8/_12/9_3 Schlumberger CDN/CDR MAD Data in 1 Bit Run (O_.H ~.dit)*~-~z T 0q/[ e- Schmmberger P1-04 P1-05 P1-05 P1-05 IP1 -08 i!xa'z~ |Pi-08 IPI-13 ~%-'7q ~Pl-13 ~%-5/I Pl-17 P2-06 ~5-1o~ P2-06 P2-06 CDN/CDR in 3 Bit Runs (O.__~H Edit),/qq~,q--B ~r-'~ CDR/GR'Only in 5 Bit Runs (OH Edit) ~'SO13/~w-~t~{° Dual Prop Resis/Densitv/Neutron/GR w/listing 5-7 Final MWD w/Listing a-~ - Final MWD w/Listing'r~ - Final MWD w/Listin~~ - Final MWD w/Listing ~-~ v" _ CDN/CDR in 3 Bit Runs (O_..~ Edi0~e~tt DLL/CN/ZDL/GR in LDWG Format w/Listing 1 6/27/93 7/13/93 7/24/93 6/6/93 6/07/93 4/16/93 4116/93 8/17/93 8/17/93 8/17/93 Schlumberger Schlumberger Schlumberger Baker Hughes Baker Hughes Baker Hughes Baker Hughes Baker Hughes Schlumberger Atlas PLEASE SIGN ONE COPY AND RETURN Transmittal #361 (AOGCC) ., Page 2 ~ell Title 1 sepia P1-21 ../Integrated Formation Log -MD P1-21 V' Integrated Format/on Log -TVD P1-21 JEngineering Parameters -MD P1-21 /Pressure Data Log-MD P2-06 v/Z-Densilog/Cmpnstd NEUTRON/GR/Ca/iper P2-06 ,/'Dual Laterolog/Gamma Ray/SP P2-06 ,/Sub-Sea Vertical Depth (Single Shot Data) P2-06 ,/q3orehole Profile P2-16 v/Z-Densilog/Cmpnstd NEUTRON/GR/Caliper 1 P2-16 ~/Dual Induction Focused Log/Gamma Ray 1 P2-t6 ,ffSub-Sea Vertical Depth (Multi Shot Data) 1 P2-16 ,/Borehole Profile 1 P2-46 P2-46 P246 P2-46 ,/Z-Densilog/Cmpnstd NEUTRON/GR/Caliper V'Dual Induction Focused Log/Gamma Ray ,/Sub-Sea Vertical Depth (Directional Drlg Data) d]3orehole Profile Run # Run Date - 4/30-5/5/93 - 4/30-5/5/93 - 4/30-5/5/93 - 4/3O-5/5/93 8/17/93 8/17/93 8/17/93 8/17/93 9/13/93 9/13/93 9/13/93 9/13t93 9/27/93 9/27/93 9/27/93 9/27/93 Company Exlog Exlog Exlog Exlog Arias Arias Atlas Arias Atlas Arias Atlas Atlas Atlas Atlas Arias Atlas Please and return to: Laura S. Lahrson, ATO-409 ARCO Alaska, Inc. 'P.O. BOX 100360 Anchorage, Alaska 99510-0360 Transmittal #361 RECEIVED NOV ~ 9 1993 '.Naska Oil & Gas Cons. Commission Anchorage PLEASE SIGN ONE COPY AND RETURN INDIVIDUAL WELL' GEOLOGICAL INVENTORY PORT 11/18/1993 PAGE: 1 PERMIT DATA DETAIL 93-132 407 COMP DATE: 9-30-93 93-132 DAILY WELL OP 93 - 132 SURVEY 9/17/93 TO 9/30/93 0.00-9068 SUMMARY Are well tests required? Yes No Was well cored? Yes No If yes, was the core analysis & description received? Are dry ditch samples required? Yes No Yes No WELL IS IN COMPLIANCE. INITIAL COMMENTS: STATE OF ALASKA ALASKA' OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RI=COMP L£TION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPEI',~)ED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number{,.,~,~ ARCO Alaska, Inc. 93-132 ~3. Address 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-22401 4. Location of well at surface ,~ .... ___ 9. Unit or Lease Name ,I VEii[1F~ 1 10. Well Number 308'SNL, 1839'EWL, SEC. 14, T12N, R14E ; ?~Y:'~¢~b ! 11. Field and Pool 275' SNL, 1963'EWL, SEC. 14, T12N, R14E 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 50.3' J ADL 34624 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. J15. Water Depth, if offshore 116. No. of Completions 9/16/93 9/27/93 9./2-E/93 ~'///~, ~2¢,7;I N/A feet MSL l Zero 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD 19. DirectionaI-S~rvey ~20. Depth where SSSV set ~21. Thickness of Permafrost 9356' MD/ 9261' MD~9183' TVD YES [] NO []! N/A feet MD ~ 1950' (Approx.) 22. Type Electric or Other Logs Run D IFL/D E N /C N L/G R/TE MP 23. CASING, LINER AND CEMENTING REC_,OF~ SE'I-FING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 94~ H-40 Surface 80' 30" 260 sx Arcticset (Approx) 13-3/8" 68# NT-80 38' 3708' 16" 1279 sx "E"/535 sx "G" 9-5/8" 47# L-80/NT80S 37' 9341' 12-1/4" 762 sx Class "G" 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MDI None None None !26. ACID, FRACTURE, CEMENT SQUI=FTF. ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) Not on production I N/A Date of Test Hours Tested PRODL~3TIONFOR OIL-BBL GAS-MCF WATER-BBL CHOKEStZE JGAS-OIL RATIO TEST PERIOD ~ Flow Tubing Casing Pressure CALCULATED..~ OIL-BBL GAS-MCF WATER-BBL ~)IL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence ot oil, gas or water. Submit core chips. N ov ~ 1 ~99g Aiaska 0ii & Gas Cons, Corn _missiof~ Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE .,e. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. HRZ 8614' 8559' Kalubik 8852' 8788' Kuparuk 8863' 8799' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ¢~" 7~,~_ ~ L'" TilleDril/ingEnginoerSupervisor Date , [ ." f ~" 4;~' '~7 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached sUpplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". .... ~ i~ ! ~ # ~,,~ ~, '~ !i~ Form 10-407 Alaska Oil & Gas Cor~s. Anchorage BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: P2-46 BOROUGH: NORTH SLOPE UNIT: POINT MCINTYRE FIELD: POINT MCINTYRE LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 09/16/93 07:00 SPUD: 09/17/93 04:30 RELEASE: OPERATION: DRLG RIG: POOL 7 WO/C RIG: POOL 7 09/17/93 ( 1) TD: 220' ( 220) 09/18/93 (2) TD: 2080' (1860) 09/19/93 (3) TD: 3715' (1635) 09/20/93 (4) TD: 3715' ( 0) 09/21/93 (5) TD: 5800' (2085) 09/22/93 (6) TD: 6425' ( 625) 09/23/93 (7) TD: 6903' ( 478) 09/24/93 ( 8) TD: 7730' ( 827) POOH MW: 0.0 VIS: 0 MIRU. N/U DIVERTER. TEST SAME. OK. RIG ACCEPTED @ 19:00 HRS. 09/16/93. P/U BHA. SPUD WELL @ 04:30 HRS. 09/17/93. DRILLING FROM 80' TO 220'. POOH. DRLG. POOH. RIH. DRLG F/ 220'-1471' F/ 1471'-2080' MW: 9.4 VIS:104 CBU. SHORT TRIP. DRLG RUN CSG. MW: 9.7 VIS: 86 DRLG F/ 2080'-3715' CBU. SHORT TRIP TO 1400'. CBU. POOH. L/D BHA. RIH W/ 13-3/8" CSG. RIN W/BHA %2 MW: 8.5 VIS: 0 RIH W/90 JTS 13-3/8" CASING. CIRC & ANNULUS VOLUME 800 BBL. CMT 13-3/8" CASING W/1279 SX PERMAFROST "E", 350 SX CLASS "G" DISPLACE W/555 BBL OF MUD. BUMP PLUG W/2000 PSI. OK. CIP @ 1500. L/D CEMENT HEAD & LANDING JT. N/D DIVERTER STACK. TOP JOB'W/185 SX OF PREMIUM "G". N/U FMC SPEED HEAD. N/U BOPE. CHANGE OUT BOP VALVE ON TOP DIRVE. TEST BOPE. P/U BHA. RIH. DRLG. MW: 9.5 VIS: 36 RIH TO 3522' CIRC. TEST CSG. OK. DRLG FC, CMT, FS, 10' NEW HOLE. C~RC. LOT (15.6 PPG EMW). DRLG F/ 3725'-5194'. CBU. SHORT TRIP TO 3707'. DRLG F/ 5194'-5800' DRLG. MW: 9.3 VIS: 36 DRLG TO 6033' CBU. POOH. CHANGE BHA, BIT. RIH. DRLG TO 6425' DRLG. MW: 9.3 VIS: 41 DRLG TO 6739'. CIRC. POOH. CHANGE MOTOR, BIT. RIH. DRLG TO 6903'. DRLG. DRLG TO 7730' MW: 9.5 VIS: 45 09/25/93 (9) TD: 8537' ( 807) DRLG. MW: 9.7 VIS: 55 DRLG TO 7745'. CBU. SHORT TRIP TO 6700'. DRLG TO 7994' CBU. POOH. CHANGE BIT, BHA. RIH. DRLG TO 8537'. WELL : P2-46 OPERATION: RIG : POOL 7 PAGE: 2 09/26/93 (10) TD: 9134' ( 597) 09/27/93 (11) TD: 9300' ( 166) 09/28/93 (12) TD: 9356' ( 56) 09/29/93 (13) TD: 9341 PB: 0 09/30/93 (14) TD: 9341 PB: 0 POOH. MW:10.0 VIS: 50 DRLG TO 8768'. CBU. SHORT TRIP 10 STDS. DRLG TO 9134'. CBU. POOH. MW:10.0 VIS: 44 POOH. CHANGE BHA, BIT. RIH. REAM TO BTM. DRLG TO 9300' TD WELL @ 16:30 HRS, 9/26/93. CBU. SHORT TRIP 10 STDS. CBU. POOH. R/U ATLAS. LOG RUN: DIFL/ZDL/CN/GR. POOH. MW:10.0 VIS: 44 LOG RUN: DIFL/ZDL/CN/GR. R/D ATLAS. RIH W/ BIT, BHA. DRLG TO 9356' TD WELL @ 18:00 HRS, 9/27/93. CIRC. SHORT TRIP 10 STDS. POOH. L/D BHA. L/D DP. MW:10.5 NaCl L/D BHA. TEST BOPE. RIH W/ 9-5/8" CSG. CIRC. PUMP 162 BBLS LEAD CMT. DISP W/ MUD. BUMP PLUG. TEST CSG. OK. SET PACKOFF. TEST SAME. OK. TEST BOPE. RIH TO 2200'. DISP W/ DIESEL. L/D DP. RIG RELEASED. MW:10.5 NaCl L/D DP. RIH W/ 1 JTD TBG, HGR. LAND TBG. N/D BOPE. N/U DRY HOLE TREE. RIG RELEASED @ 16:00 HRS, 9/29/93. MOVE RIG TO NK-22. SIGNATURE: (drilling superintendent) DATE: A~.chora~s ~ ( .. ( ~'V 0.0/ 0 ~~. ~ (/ !W;E !(! t 1 ~~II4H"f¥-***~***'~I~~",**",****,**H18 ****,.,*'" Ø-lffoBotfQr oWfIHI...,.. ANAœI!l *.Wlft4I4-. fH.4Iff~ St~&: *'*~ If-"*",*R ø*,*ø:j- ~~¥*~**'****""*'~*~'.VKÞ..xrJ.K~~*IÞ**"****~ **¥)€Ø4~** SlR\JEY PR\X:-PRI *"**""'*.... cmP~'l. PRiJ»iG 5ttY IFlWNG W!t! MAI'!E P2-4&f 1laT!œ 1 P!!I~' I'kItm'P.E LOCAT¡I)I 2 1& J ALA9A ""',..rI~ DECLIMAã!DN 3'~.O7 DATE ~ . 16-s:F..9] .:I:~ NlR5: 0 WE!l HEAD LOCATION: LA!(HI-S} 0.00 DEP(E!-W) 0.00 A:IPru7H FROI'! ROTl¥:"t -:AÐi.! 1'U TRE! IS 82t~ TIE I~ POIN! {TIP) : m3Lf€L Ii~ ~tOO !~J! \'IF:T DEFt!i t:.OO RECEIV.ED Itti.it'':ltti 0,«. AZ!I'IUni \I.OC lA!I'l\fE(ti,'-S! C.OO NOV - 1 1993 DEPARTs:! (E/-U) 0.00 Alaska Oil & Gas cons. c.;oroU\\SS,oa" AßCIØ8IJI . .rl:6~~. .2 ( r~ .. .w.,.:iI'",~",.--", ~lt~?¡t: ~~~~~.~*.4f** ;".i::I'i:f C~L~:J:n~,:: W'..*4"¡'U"'''1''' C!~.::::::..ð:!~ ~~ ~H~'.~~4~ ~:.IJ:!!' IÏ\"J:R~ ~'::R!1:?':' :AFSü c..-!'þ, Too -. . A:!:1~7~; L~:!TCE !.úM:r&"i! J!5f~~æ;r !'t Þ'!!!fJI'E Too", .- ..!~,-! :.L~ ~a:!:1 DtPTH SEcr¡CrN .W'!W i'F-2 1:' .. ~!~' ... .-- . _..~ ~'t !t f! ft Gi; è; ft f: f- de,; .. r"..z~ . ~ ... -.. . ... .... ~t~ ~.O'~ {; . OC. ., ,.,. ~,,~~ ~..)j O.~{. :jt~' ~.~.~ ~:~-:. ..'.\..: _I.- !~.~-!. æ r. ~.9i Ct. crt C.~ 1"':' ~,: ~.~ ~.~, ~.2:: 172.~9 {.. 4é. ."' ""_Iti. !"I'" 4: o«¡? 150.!ß G.3: '.a i.'C 70.~ -~.42 O.4~ O~:5 !3&.32 !) .69 ....-..&.- ,... ~ I .. !¿~ .i3 6;..~ ~6i ,7¡ 1.22 (). E~ E.3.~ -O.?l l.27 1.21 1~.!1 e.L? 35?73 90.~ 359.72 2.3S ~.e5 fl.7:t 0.00 2.4~ ~.~) 90.11 o.æ 450.?~ 9C16 4!").~ ~.5t O.~9 &8.:'1 O.~~ 3.~~ 3.~ e~ .7':. O.4~ 54.j.?5 9~.4 54':,,72 4.~ '.8e. 54.25 ~.6~ 4.47 4.52 81.87 O.~-t' ~"'9 .91! DQ r;¡ ó..~ . ~ !.7i O.~ 94.t3 G,9~ S.6~ 5.77 6G. 5~ o.6-~ .. . .. :~.O6 92.1 722;~1 7.36 1.21 106.97 ~.60 7.36 7.39 æ:.36 0.40 8OS~12 6.' .1 809.œ. t.!t 1.2'1 79.31 0.50 9.17 9.18 a6.~ 'J.ó7 ~~~.:~ 97.6 ~06.6:3 11,22 1.20 86.59 0.76 11.22 11,~ 9ó..13 0.16 ~e9.5 82.8 989.44 12.9c: 1.~U 104.77 0.57 13.00 13.01 17 .49 (\.SO !O:1.15 89.6 1079,00 15.æ 1.70 96.75 0.15 15.:U 15.31 89.~3 C.49 117G,71 91.6 11."0 I~ 1i.f2 1.87 10~,4i -0.36 1£.1! 19.U 91.13 O.3C 12é ~ .5(:: 9(..8 1261.26 I !CI .7f: :!.18 11!.U -!.~ 21.08 21.14 904,11 0.66 1m le~ ~.3 1~.5C 23.41 2.11 125.54 -3.36 24.<'5 24.29 97.95 0.30 144::..26 87.4 144'..87 3.CE'1 2.63 1~2.55 -5.68 m.ðó '0,47 101 ~ 93 0.63 15".::7.C9 95.8 1536.5i 2S.66 2.99 14:>.0( "9.09 30.11 31.-4~ 10¿.i'r 0.53 lé,7.79 ~O,7 162.7.19 30.79 2.25 143.58 -12.33 32.68 34.93 119.6.'" l,) .54 1!18.i~ 10° 171!.œ 32.51 1.72 133f92 -14.72 34,72 37.72 112.9¿ O.6e. . . 1!!1.65 93.0 1810.97 33.61 1.45 150.99 -16.71 3;.30 ~ Q- 114.i2 0.59 .. ..1 19)3.03 91.4 190Z.31 34.4( C.74 ~.5~ -!8.2ó 31.11 41.36 116.20 0.77 19r3.1~ ~.1 1m.4~ ~.7E O. 4a~ 136.79 -19.02 '1! .~-6 42.10 116.85 0.43 ~)81.49 9~.2 iilß¿.it 34.7i O.4i !OC.35 -19.62 37 .65 42.46 117.52 0.49 21:8.~ 91.0 2177.83 34.* O. '31 Sla.7S -19.18 3i.36 42.28 117.90 0.74 :Ü;O.55 , 92.Q Ut9.84 ~.41 0.12 ~.6A. -1~&~ rI.26 ~2.09 117.U. 0.37 2j!l'.:i4 89.7 2:~ .!3 34.49 0.12 æ~,03 -19.39 37.34 42.(;7 117.44 0.14 24~.OC' 94.8 2-4SoÇ. 2! 3(.84 0.5-' ~.l5 -19.05 37.Œ .4.2.20 . 116.&S O.4! 2544.!Q 89.8 2544.06 35.1t\ 0.23 199.19 -16.99 37.91 42.4) 1~6~6! 0.78 2~:7cOl 92.~ '!ë3~.29 3.14 C.26 25.~ "'1E..9¿ 37.9~ 42.042 1l6.~ O.5~ Z'Sl.'l! 94.3 2730.~ 35.51 0.42 37 .17 -18.47 38.25 ~.4ð 115.7S O.t! 2221.44 %.2 2&20.i2 Z.~ 0.45 19.',2 "'11.&8 38.57 42.51 114.6.'" O.~ 2~12~51 91.1 2~11.78 ~f2& ".3! 55.00 -11.40 38.89 42.60 114.1~ 0.29 »)4,29 ~l.! 3(\C':! I\i 3i-.~ O.3t1 ~9.41 -17.12 39.33 4!.e9 113.52 0.00 .11.- 3~9-4,20 !9.9 ~9;. 47 3:.::4 0,56 138.43 -17.31 39.85 43.44 113.45 0.66 31t:7 t~ 93.0 ~lt6.49 37.~ O.l~ 153.26 -17 (T! 4C,21 4:: . 96 113.M 0,42 3rB.23 91.0 3ü7.~O 37.47 0.21 212.39 -18.00 40.18 44.04 114.17 0.21 3!71.65 93.4 3370. 9'Z 3i.36 Ot~ 173.67 -18.37 40.11 44.11 114.62 0.16 34ó4.07 92.4 3463.34 37.32 0.39 179.43 -18.89 40.13 44.35 115.20 0.16 !!58.61 ,~.~ JS57 t 8.; 37.29 0.4& 171.!2 -19.60 ~O.19 44.71 115.99 0.11 RECEIVED NOV - , 1993 AI8Ska 011 & Gas Cons. Comm'ss'c,... A "(~"O"'-i"8 ._.; ÑÙ. ~ . - , ?!( "*'Ø;.trf+.~~'" Pi!;;': .?:~ *""~H-4+',"~.w. s,--;~.~a ~Þ¡~:r:!~~i;S *I-~t~~*~~ t!i::~ AR~ r.!!n~~""~+ !":!.;saRE:1 !r~:E.=:\.IAi.. rlEF.!rL~ "ð~':" ;y::!:aN :1:I~.¡7:-: Lð.7!!:Ji:5 D:?w"!':iæ !:SFI.A::ræ-;y 1! ~:IMC':'¡"i 1:1: 1....__':' DEr:'P. I~Tr: SE:'!'!O!~ IiC!.."!, N.!~E E/-i;: di~/ f! ~- ft: ç~ :1e~ d5~ ft J:~ f~ d:g ,P""z- . . . . ~\.."I - :XL:. ~-< ~,9.j 3éZ" .2: S; .2é 0.4-;. 179.~ -2C.li 4~.::4 ~.G: 11¿'t~! ~.~~ :;74~t~Ö 112.3 o:I""~ =''': 3-6.!~ O.~l 211.47 -21.03 3?~? 45:t2~. 11:' .&:' 0.25 ~. .:). t':- ]&:.7: ~.4 ~!:£t9i 3é.I~E .'\ F 24£ .::.- -.,~ 1\7 39.~~ .. QC: as .!: o.~ ..I - __I.. ~.... ~~ t !.3 93.9 ~~2~.~5 3S.~ ~:. 3~ !~S .6: -:22.0~ 3~,~~ ~+7~ :lj . ~~ ~.:.; 40~? ,6Z C-':o" 4-:'¡é.8Ï ~.~e 0,44 'r7 ;"1 "2Z.48 3~.~ ~.~ 31~.39 I). t:! --I. -. I.. 41~9.0! 91.4 41~B.26 34.61 C'õ15 2E9.41 -22.~ 3/.i!ð 44.09 ~2C .71 0.32 04~~2 c!Z 93.! 42{'~ .7£ ~.{:7 o,~ 239. G:. -22.7S 3:."fii 4~.?i 1El.!~ O.4¿, 4JCll.27 91:.7 43(11).51 3S.t2 {:.~ t"5.25 -23. l" 3E.99 43.7: !~.2E o.~ 4P3.14 91,9 4~Z.SS :'31 ~~ (,1,( ~.78 -2S.?1 36.91 4~.67 122,i2 Oc~~ 44S,~. B7 9317 446b.11 33.40 6.21 U7.56 -23.91 26.84 43.92 122.9! 0.26 451S .06 92.! 457t. 3-~ 3S.~~. Oc!2 225.X -2J1.23, 3ó.?~ 44. c'~ 123.35 {)'':! .-- 4670.05 91.0 46b9.2~ ~.85 O.4~ "1.98 -24.60 3b.37 43.91 124.07 0.24 4764.33 9<,3 1J6.3.'SJ 32.40 c.2! 234.3:' ..24.99 25.97 4S.~ 124.72 Ch24 -4!ffs.l1 93.8 48S7.æ 32.15 o.æ 1M.59 -Z,38 35.ï8 43t~ :!.~.35 0.27 4950.16 92.0 4949.40 3!.1! 0.39 164.40 -25.96 35.82 44.24 1!5.tg 0.17 5043.36 9:1.2 5042.62 31.94 0.28 2~.58 -26.36 35.70 ~,37 1!~ I 45 0.47 51:;:..~1 ~9cS 513::.1( Sl. 5~ 0.5<1 193.90 -2i.B( 3S.4C ~,42 127.17 0.44 5230.44 97.5 5~':I9.t7 31.51 0.55 163.51 "27.70 ~.42 44.97 128.02 o.2! 5323.11 92.:' 532! 134 31.55 0.31 1'ry' .1~ -2£.37 35.57 4!. 5t. US t58 o.2i 541ð .46 95.4 5417.69 3~,6~ 0.33 ~4. 3( -¡a.65 35.85 45.90 13..63 ~,44 5:11.4£ 93.0 551C. !,S 32,16 ~.1~ lC5.5l "26.71 ~.24 46. t3 12s.ae O,!9 56Q2.79 91.4 5602.01 32.97 ~.87 65.34 -28.49 7/.01 46.70 111.5a <;.8! 5696.~ 93.3 ~~,2! ~.4E i.a? 6S'.~ -Zi . 9~ 38.4£ 4Ï.53 1!5.99 0.17 51aa.65 92.6 51!." ..84 ~.62 '.77 52.24 -27.25 39.72 ~c18 124.45 0.40 5&£3.68 9!i .I~ 5&Z.M 1/.51 1.41 68,57 -26.44 41.32 49tt% 122.l1 o.~ 5976.63 93.0 5975.76 .fO. j4 1.76 74.i& -25.64 43.76 50.72 1~.3i 0.41 599£.57 21.9 5mt7~ 40.73 1.91 16.71 -25.47 44.44 51.22 119.!2 0.7< ~!i . f! 89.4 6087.05 43.~ 1.87 74.08 . -24.73 47.30 53.37 117 . 6/j 0.10 6164.1£ 96.2 6183.21 46.74 1.as 72.. i2 -23.54 50.29 55.6~ 115. :it 0.05 ~274Ii3 90.6 ~2]~;j2. 49,51 1.71 71.4~ -22.97 ~.9~ ~.73 11!t4S {\ c 16 t~~,71 '7.e 63:"0 I ô7 52.~e 1.39 11.49 -22.1~ ~.~ 59.7! 111.ii 0.33 ~4~4.04 92.3 b462~?~ 54.76 2.10 61.16 -z~ . ~1 5:" . 9~ H.õ7 109.&8 O.a4 6'!f:! .; 6!- 9'3.¿ 65S¿.51 57.93 2.1; 57tOð -19.19 6C.9l. 63.91 107 .~9 O.lt 6-'..5CI. 86 93.2 6649.62 61t4~ 2;:'2 55.23 -16.9? 64.23 66.44 104.82 0.64 6740.3,( 89.5 ¿¡""a8.9S 66.25 4.œ 59.1l -14,16 68.69 70.13 !~1.(.4 1.50 W3.!9 93.5 6832.22 'n t (17 4.86 64.67 -10.76 ~.lL 75.e9 9!.15 1.01 i92f.81 95.9 6?Zl.64 12.37 6.67 68.41 -6.'6 84.00 !4.22 94.7~ 1.91 7023.4.7 93.7 7020.40 94.3b ð.46 i9.OS -2.49 95~51 95.54 91.49 1.93 7119.C.7 ~416 7113.81 109.54 Uh34 73.)0 2.40 11(;,17 110.19 16.75 2.12 7212.23 94.2 721)6.18 127.&3 11.98 78.50 ~.74 117.85 1~!.O3 et..98 2.01 RECEIVfD NO"" - , 199J MIll OD I. Gas Cons. "ununtSsIO" Anchorage I . . ..~:. ~i::. < . F{ .f t .¡..r-1t¥4" ,;I". oW ",., ;¡ !êr~:!t: *. ~:,.o..¡.Iþii4M';. ~.:ï ~Þ';':!J:J¡~!~~~ ---{.4Ji"~~ I/,.:n tlf!'J~';;:. AAL r'Z'H~.4-14"'..:¥fo::'toV r.::r\!$;i:!. !!.:'$:V~: 1E.'rI:~~!. !hF:;:! """.-œ t-::~~T-i ~;':'!~':J:.~ D~ ~!.:.E~ ¡'!S~:'~~.:.!;! ::: 1-:~~~7~ I:~ ::!M~':' .. !I~!H ~Ef!~ ::!C!!O~~ ~~w. a'.!: ~:-w ~5;/ ~. f~ ~+ f~ dE; !:15~ it ~.. .... :.~:; ~ l~! . " .. ¡ :. I " ~~3. ;~ '"III: P 7".Q=: "':'c. fj- ":.' 12.~ --: ~~ 1~.!2 I J'7 a;';i H7.6~ ,- ,.. o.~ ~.Lt:' . -. - t. . ..., .-.. . . I~.r _II t- ..:I~- .,,~ I ':'C- ~:..A 7".F -0: 16:.S:t l~.n ;-~. l~.e~ 1!.!.OZ, 16! I!; ;~,y! 1.O! I ." - \i. I .'18-'.- I . I.. "$':- H 92.: ":: 'jI\ I:'r" 1?1.2~ 14.!! 7~.eE 19.9" 1~ .,~ 111.33 Q;: ... ~.!E . -..... . .. - t-- -. . t_. .. I . ,~:. 7SS:; . ï: ili.:- "!SO. í: ::l~,L~ ~4,:2 "!7c~ 25 c 26 ?1 ~,.., L~~.~ £3.f¿ 0.28 __.1. - -..... ... ?~.3 16S~.~7 23$ .1~ 1 ~ . 63 76.14 3{ .3Q ~37a18 !:-i ~!~~ ~ti2 o.L . :.. ;:18,.':'".1 7771,74 ~.f 774õ.81 ~6S. [i 151:9 77 .7\.1 J5t~7 :!-~.S9 263.2i 62.fE C=14~ ":"¡¡, ,,1:\ ,-' ~31~ :!36.7å 28: . ßl !~.40 78.54 40.44 ~~.9i 287.82 !1.~ 0.33 . .-..... 7i5.7~ 90.7 :r~~. 21 31~ .9¿ 15.57 i7.s.: -6.:! ~£.6E 312.C{ Bl.6~ 0.27 s.~~~. 98 91~IL 8Cl:.OE ~ó.2! 1~.25 i6.C9 5\), 90 232.48 33~t~ 81.~ 0.:1 8140 I~~ ~4.:. a10317~ 3~.1. ~~ 15.S4 T1.0~ 56.S6 357.49 361. ~ 8C.9t 0.27 82~3.B3 ~:!.~ 819S.76 38? ,4C 16.U 7St9~ ~2.6ð 382.47 38.7.60 IO.M 0.37 ~6.?6 92.9 62E.~c1~ 41!.n 15.85 7e..19 M.St 4G1.3Z 413.05 60.~ Ch6~ !419.:4 93.2 8372.70 438.33 U,.10 76.37 :4.24 432.33 438.6i- so.u 0.60 B511.æ 91.7 E46!: c 7£ ~6S.7S 16.:U, 16.8-1) 80.17 457.20 ~.li 80.05 0.22 ~~&8.4a 96.8 @S5).G2 49~.44 15.90 77.15 66.22 4&3.S2 4~.95 19.89 0.39 t701. ~ 92.S M4S,14 ~15151 15.64 15.11 92.~ 507 .81 516.1L 79.70 O.6~. ~4.10 92.8 8n2.Sð 8\4:"', ,.., 1~.31 73.4.5 96.97 531.65 50.7& 7~.46 0.60 - ... r.... 8&!.7.~'? 93.~ 6S22.2~ 5~.~ 15.39 74.0: ltJ .B6 555.22 5/,,5. 2E 79.21 0.16 9976.80)t '117~~ 691C.73 58! ,26 15,16 i4.32 ~ 112c~ ~ ~8.5'3 ~9.j~ 19.00 ~.!I 9068.00 6 8S-.2 C!'996,ô~ 611. Z 14.96 7L.œ 118.36 C.~3 61244£ ie.a! C.S3 2. tjÞ~ --l1 ,?,. '~5fø .'****~~* ,,It..IX¥.If***, 1.31 lot 3c 2- RECEIVED NOV - 1 1993 Alaska Oil & Gas Cons. w,,,sniSS'lti" Anchorage Date: Subject: From: To' ARCO Alaska, Inc. E~ourne/Point McIntyre Engineerir.,_ October 13, 1993 Transmittal #359 ARCO Alaska Inc. Bob Crandall A~C 3001 Porcupine Drive Anchorage, AK 99501 The following Point McIntyre data are enclosed. This information is confidential and your cooperation in maintaining confidentiality is appredated. Log Well Title P1-04 Completion Record, Perforation HSD 6 sip 33/8'' P1-05 P1-05 P1-05 P1-05 P1-05 lP1-08 P1-08 P1-08 P1-08 Run # 'Run Date Perforating Record 3%" HSD 4lB HJ H RDX'S'', Perforating Record 3%" HSD 4lB HJ II RDX-- ~" 8/19/93 8/23/93 Perforating Record 3%" HSD 41B HJ H RDX- 5", Perforating .Record 3%8"t-ISD 4lB HJ II RDX" 5") Perforating Record 33/8'' HSD 4lB t-If II RDX Integrated Formation L'og ~~ ~M0o- tooq, l,,~ ~ Integrated Formation Log~-~ ~6c~z.-~?72.) - Pressure Data Log-MD ~~ e~cz~ - ~?~ - 1 ~,~'~ 8/30/93 1~i'~8/31/93 1~,~e..~9/01/93 1 .~--"9/02/93 7/19-24/93 7/19-24/93 7/19-24/93 7/19-24/93 Company Schlumberger. Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Exlog Exlog Exlog .Pi-(BS~f Integrated Formation Log PI-08Srl Integrated Formation Log Engineering Parameters Pressure Data Log-MD !~ 7/25-31/93 7/25-31/93 7/25-31/93 7/25-31/93 Exlog Exlog Exlog Exlog P1-13 P1-13 Pl-13 ~P1-13 Integrated Formation Log-1~ 2", co~oo- l! 005 _ Pressure Data Log -MD ~" cot~5o - ~,'~ ~o - 6/M /93 6/1-11/93 6/1-11/93 6/1-11/93 Exlog Exlog Exlog Exlog P1-17 Pl-17 P1-17 Pl-17 Integrated Formation Log Integrated Formation Log. z_.t~, -~" Engineering Parameters Pressure Data Log -MD 4112-16/93 4/12-16/93 4/12-16/93 4/12-16/93 Exlog Exlog Exlog Exlog PLEASE SIGN ONE COPY AND RETURN Date: Subject: From: ARCO Alaska, Inc. '-=Isburne/Point McIntyre Engirteer'~g November 17, 1993 Transmittal #361 ARCO Alaska Inc. To: Bob Crandall AOC~C 3001 Porcupine Drive Anchorage, AK 99501 Enclosed are sepias for the following Point Mdn~e logs. These sepias were erroneously omitted from Transmittal #359, sent t0/13/93. This information is confidential and your cooperation in maintaining confidentiality is appreciated. Log Well 1 sepia )m-os /P -05 [Pl-05 /P1-05 ~P1-05 P1-08 P1-08 P1-08 P1-08 Title Run # Completion Record, Perforation HSD 6 sfp 3%8" 1 v/Perforating Record 3%$" HSD 41B HJ II RDX ,/Perforating Record 3%~" HSD 41B I-If 1I RDX v'Perforating-Record 33/8'' HSD 4lB HI II RDX x/Perforating Record 3%~" HSD 4lB HJ II RDX x/Perforating Record 3s/~'' HSD 4lB HJ II RDX Run Date 8/19/93 ,/Integrated Formation Log-MD v4ntegrated Formation Log-TVD ,/'Engineering Parameters -MD ,/Pressure Data Log-MD Company Schlumberger 1 8/23/93 Schlumberger 1 8/30/93. Schlumberger I 8/31/93 Schlumberger 1 9/01/93 Schlumberger 1 9/02/93 Schlumberger 7/19-24/93 Exlog 7/19-24/93 Exlog 7/19-24/93 Exlog 7/19-24/93 Exlog ' I,/PIq38b-T1 Integrated Formation Log -MD I';)'J~ [V'PI-IJSSTI Integrated Formation Log 'TED | v'PI-08ST1 Engineering Parameters -MD ~ v4'~I~ST1 Pressure Data Log-MD · - 7125-31193 ~ Exlog - 7125-31193 Exlog - 7125-31/93 Exlog - 7125-31/93 Exlog Pl-13 -/Integrated Formation Log-MD Pl-13 v' Integrated Formation Log -TVD Pl-13 ,/Engineering Parameters-MD 'Pl-13 v/Pressure Data Log-MD' 6/1-11/93 Exlog 6/1-11/93 Exlog 6/1-11/93 Exlog 6/1-11/93 Exlog 1P1-17 ,/'Integrated Formation Log-MD' C~9/~\ ~Pl-17 /Integrated Formation Log-TVD }P1-17 v/ Engineering Parameters -MD |P1-17 /Pressure Data Log-MD - 4112-16/93 Exlog - 4/12-16/93 Exlog - 4/12-16/93 Exlog - 4/12-16/93 Exlog PLEASE SIGN ONE COPY AND RETURN ALASKA OIL AND GAS CONSERVATION COMMISSION September 13, 1993 Michael Zanghi Drilling Engineer Supervisor ARCO Alaska, Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: 'WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 Point McIntyre P2-46 ARCO Alaska, Inc. Permit No: 93-132 Sur. Loc. 412'SNL, 1290'EWL, Sec. 14, T12N, R14E, UM Btmhole Loc. 608'SNL, 1862'EWL, Sec. 14, T12N, R14E, UM Dear Mr. Zanghi: Enclosed is the approved.application for permit to drill the above referenced well. The permit to drill dOes not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. _ Chairman BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. r)~Cx'~ printed on recycled paper b y STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.0O5 la. Type of work Drill [] Redrill BJlb. Type of well. Exploratory l-I Stratigraphic Test [] Development Oil [] Re-Entry [] DeepenI-]I Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, inc. KBE = 53.5 feet Point Mclntyre 3. Address 6. Property Designation P. 0. Box 196612. Anchorac/e. Alaska 99519-6612 ADL 34624 4. Location of well at surf-ace 7. Unit or property Name 11. Type Bond(see 20 A^C 25.025) 412' SNL, 1290'EWL, SEC. 14, T12N, R14E Point Mclnt)/re At top of productive interval 8. Well number Number 572'SNL, 1756' EWL, SEC. 14, T12N, R14E P2-46 U-630610 At total depth 9. Approximate spud date Amount 608' SNL, 1862'EWL, SEC. 14, T12N, R14E 9/17/93 $200,000.00 12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth(MDa,dTVD) property line ADL 365548-608' feet P2-60-17'@ 1950' TVD feet 2560 9293'MD/9220' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth 6~z6' feet Maximum hole angle ~5 o Maximum surlace 3330 psig At total depth (TVD) 8800'/4390 psig 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 94¢/ H-40 Weld 80' Surface 80' 80' 281 cu ft Arcitcset (Approx.) 16" 13-3/8" 68# N T-80 B TC 3659' 41' 41' 3700' 3700' 2775cult "E'y406 cu ft "G"/235 cu ft "C" 12-1/4" 9-5/8" 47# VT80-S NSCC 9252' 41' 41' 9293' 9220' 915 cu ft Class "G" 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural ConductorRECEIVED Surface Intermediate Production S E P ~ 1 ~99,~ Liner Alaska 0il & Gas Cons. 60mrnissio~ Perforation depth: measured Anchorage true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling programrR1 Drilling fluid program [] Time vs depth pict [] Refraction analysis[] Seabed report[] 20 AAC 25.050 requirements Fl ~.h~y certify that the fo egoing is true and correct to the best of my knowledge Signed /~ ~'~/~//~--~CommissionTitleDri//ingEngineorSuperviS°ruse Only Date ~)""'~/'~=~"~ Permit Number / IAPI number IApprov.~l date ISee cover letter 9,~' '//, ~' Z.., 150-O '> '~'" ~' ~ ¢43 ,/ I ~,;--//.,.~ "¢~ I,or other requirements conditions of approval Samples required [] Yes [] No Mud Icg requiredI-I'y~ [] No Hydrogen sulfide measures [] Yes 'l~ No Direction~ survey requ~rea ~ Yes [] No Required working pressure for DOPE []2M; E]3M; /I~M; 1-110M; F-I15M; Other: Origins! . Signed By by order of Commissioner me commission Date Approved by David W. Form 10-401 Rev. 12-1-85 Submit in tri)licate ( ( P2-46 Operations Summary 1. MIRU drilling rig. 2. Spud well and drill 16" hole to 3700' mdl 3700' tvd. 3. Set 13-3/8" casing and cement same. Test casing to 3000 psi for 30 minutes. Nipple up BOPs and test same to 5000 psi. 4. Pick up 12-1/4" BHA and drill 10' of new hole and perform leakoff test. Kick off at 6676' MD and build hole angle to 15°, 108° azimuth. Continue drilling to 9293' md I 9220' tvd. Run wireline open hole logs. 5. Set 9 5/8" L-80 casing and cement same, displacing with 10.5 ppg brine. Test casing to 4000 psi for 30 minutes. Displace the top 2200'tvd of casing to diesel. 6. Install a master valve and tree cap. The well will be completed at a later date. 7. Freeze protect the annulus. 8. Release rig. 9. Run cased hole logs: cement bond log. Note: This well will be completed after Pool #7 moves off location. RECE1VED SEP - 2. 1993 . .' .SS\lW Alaska Oi\ & Gas Cons. liun\\n\ Anchorage I Well Name: I PM 2-46 Well Plan Summary IType of Well (producer or injector): I WATER INJECTOR ISurface Location' Target Location' Bottom Hole Location: 412 FNL, 1290 FWL, SEC 14, T12N, R14E 572 FNL, 1756 FWL, SEC 14, T12N, R14E 608 FNL, 1862 FWL, SEC 14, T12N, R14E IAFENumber: J2C0039 I POOL #7 IEstimated Start Date:l 9/17/93 IuD: 19293 I I Operating days complete: I TVD' 19220 brt I JWell Design (conventional, slimhole, etc.): tO 16 I KBE' 153.5' JBIG BORE / LONGSTRING / NO COMPLETION Formation Markers: Formation Tops MD TVD (BKB) WEST SAK 6854 6854 K- 10 8566 8519 K-5 8731 8679 HRZ 8731 8679 KALUBIK 8856 8799 KUPARUK 8862 8804 TD 9293 9220 Well Plan Summary P2-46 Page 1 RECEIV D s E P - i 199;:~ AlasRa 0ii & Gas Cons. Oomrnissiol, Anchorage Casincl/Tubinq Proqram: Hole Csg/ Wt/Ft Grade Conn Length Top Btm Size Tbg O.D. MD/TVDbrt MD/TVDbrt 20" 20" 94# H-40 WLD 80' GL 80/80 16" 13-3/8" 68# NT-80 BTC 3659' 41'/41 3700/3700 12-1/4" 9-5/8" 47# NT-80S NSCC 9252' 41'/41 9293/9220 TBG NONE Logging Program: I Open Hole Logs: SURFACE PRODUCTION Cased Hole Logs: NONE Atlas wireline GR/Resistivity/Neutron/Density (From top of West Sak to TD) No MWD logging. [MWD directional onl¥-Anadrill] Cement Bond Log (After Rig Release) Mud Program'. ISpecial design considerations IFresh water dispersed mud to TD (KCL is not needed in I water injection wells) I Surface Mud Properties: I Spud Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.7 300 40-60 30-60 60-80 9-10 15-25 Intermediate Mud Properties- ! Fresh/lightly dispersed Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.5 50 20-40 15-20 20-30 9-10 10-20 Production Mud Properties' I Fresh/lightly dispersed/no HTHP spec. Density PV Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.5 8-15 25-30 5-15 10-20 9-10 10-15 10.0 15-30 25-30 8-12 <25 9-9.5 8-10 APl Well Plan Summary P2-46 RE( EIVED S E P - 1 1995 Alaska Oil & Gas Cons. Anchorage Page 2 Well Control: Well control equipment consisting ol 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Directional: I KOP' I 6676'; departure=602' at TD Maximum Hole Angle: ! 15 o; 108° Azimuth Close Approach Well- I P2-60 @ 1950' tvd in P2-46 (17, Sep Factor= 0.91 The above listed wells will be secured during the close approach. Well plan Summary P2-46 RECEIVED S E P - 1 t993 Alaska Oil & Gas Cons. Comrnis¢o~ Anchorage Page 3 Surface Casing Depth: Surface Casing Size: Surface Casing Weight: Bit Diameter: Excess Factor Intermediate Casing Depth: Intermediate Casing Size Intermediate Casing Weight: Proposed Top of Cement Bit Diameter: Excess Factor: P2-46 Cement Volumes Surface String 37OO 13 3/8 68 16 2 LEAD (TYPE "E" PERMAFROST) Yield 2.17 Density 1 2 # sacks 1279 (2775 Cu. Ft.) TAIL (CLASS G) Yield 1.16 Density 15.8 # sacks 3 50 (406 Cu. Ft.) TOP JOB ('rYPE "C" PERMAFROST) # sacks 2 50 (235 Cu. Ft.) .94 cuft/sx 15.6 ppg Production String 9293 9 5/8 47 7862 12 1/4 1.9 LEAD Yield 1.98 Density 1 5 # sacks 0 # bbls 0 TAIL (CLASS G) Yield 1.2 Density 15.8 # sacks 7 62 # bbls I 63 ( 0 Cu. Ft.) (91 5 Cu. Ft.) Alaska 011 & Gas Cons. Commission Anchorage Prudhoe Bay Dril ag Prudhoe Bay Poin[ M¢Intyre P2-46 P2-46WP VERTICAL VIEW SCALE 500 ft. / DIVISION TVI) REF: WELLHEAD VERTICAL SECTION REF: WELLHEAD HORIZONTAL VIEW SCALE 100 ft. / DIVISION SURVEY REF: WELLHEAD HALLIBURTON' D~{ LLINO SYSTEMS 04/30/1993 9:83 om 01, 0,00' 8 0 MD TIE IN / 500-- 573-- 873-- 1000__ 1300-- 0.00' @ 573 MD START OF NUDGE @ 1.00 DEG/IO0 F1 1.00' ~ 673 MD ~.00' ~ 773 MD 3.00' ~ 873 MD END DF BUILD , 3,00' ~ 1000 MD START DF CURVE 8 1.00 DEG/IO0 F 2.00' 8 1100 MD 1.00' ~ 1800 MD 0.00' ~ 1300 MD END OF NUDGE 100 200 300 400 500 600 700 800 13.375 OD, ~ 3700 ND, 3700 TVD C' Alaska OiJ & 6as Cons. Commission Anchorage OD .D I.c .%; TvD .orth 13.375 in, 3700 0.00 0 3700 -10 20 CRITICAL PRINT DATA 0,00' e 6676 MD START OF BUILD 8 2,00 DEG/iO0 FT 2,00' 8 6776 MD 3.56' @ 6854 MD West Sac 6,00' 8 6976 MD 8,00' ~ 7076 MD 10 00' @ 7176 MD 12 00' ~ 7276 MD 14 00' e 7376 MD 15 00' e 7426 ND END OF BUILD MD TIE IN 0 START OF BUILD 573 8 1.00 DEG/iO0 FT END OF BUILD 873 3.00 116 START DF i000 3.00 116 CURVE 8 1.00 DEG/IO0 FT TARGET 1300 0.00 0 START DF BUILD 6676 0.00 0 e 2.00 DEG/iO0 FT West Soc 6854 3.56 108 END DF BUILD 7426 15.00 lOE K-lO 8566 15.00 108 K-5/HRZ 8732 15.00 108 Kotublk 8856 15.00 108 TARGET 8868 15.00 108 TARGET 9193 15.00 108 Totot Depth 9293 15.00 108 Inc Azl TVD North Eost 0,00 0,00 0 0 0 0,00 0.00 573 0 0 .57 873 -4 7 .57 1000 -6 13 ,00 1300 -10 20 .00 6676 -10 20 43 6854 -12 25 43 7417 -41 113 43 8518 -134 393 43 867~ -148 433 43 8798 -158 464 43 8804 -158 465 43 9i84 -185 546 43 9220 -194 571 498 15.00' 8 8566 MD K-10 15.00' 8 8738 MD K-5/HRZ 15.00' 8 8856 MD Kotubik 15,00' 8 8868 MD TARGET 577 603 15.00' @ 9193 MD TARGET 15,00' 8 9293 MD Totat Depth i 0 500 1000 VERTICAL SECTION PLANE: 108.73' Dc~e PLotted : 4/30/93 Created By Checked By Approved By Do~e TVD 9220.09I ~D 9292.68I VS 602.89l North -193.58I East 570.961 Z .7' u~u ~1U ~0~ >~..~ ~ZZZ ' ~ 888888888888 ** CHECK LIST FOR NEW WELL PERMITS ** ITEM APPROVE DATE Loc [2 thru (3) Adm i n 9~_~t h ru 1~3~]/72 ,., [10 & 13] , [14 thru 22] [23 thru 28] (5) BOPE (6) Other [29 thru 31] [32] (8) Add l 9eology: engineering' DWJ MTM f RAD -D ~- t ~ RP, .,C_C~ B E~/_~_---~Z~ J DH~?/? TAB'~ . 2 3 4. 5. 6. 7. 8. 5 10. 11. 12. 13. 14. 15. rev 6/93 jo/6.011 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. Company /~ c ~ Lease & Well YES NO Is permit fee attached ............................................... .~_ Is well to be located in a defined pool ....... · Is well located proper distance from property line ................... Is well located proper distance from other wells ..................... Is sufficient undedicated acreage available in this pool ............. Is well to be deviated $ is wellbore plat included ................... Is operator the only affected party .................................. Can permit be approved before 15-day wait ............................ Does operator have a bond in force ................................... Is a conservation order needed .......................... ' ............. Is administrative approval needed .................................... Is lease ncrnber appropriate .......................................... Does well have a unique name & ncrnber ................................ Is conductor string provided ......................................... Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. Is enough cement used to circulate on conductor & surface ............ Will cement tie in surface & intermediate or production strings ...... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension, and burst. Is well to be kicked off from an existing wellbore ................... Is old wellbore abandonment procedure included on 10-403 ............. Is adequate wellbore separation proposed ............................. Is a diverter system required ........................................ Is drilling fluid program Schematic & list of equipment adequate ..... Are necessary diagrams & descriptions of diverter & BOPE attached .... Does BOPE have sufficient pressure rating -- test to ~-OO~psig ..... Does choke manifold comply w/API RP-53 (May 84) ...................... Is presence of H2S gas.probable ...................................... FOR EXPLORATORY & STRATIGRAPHIC WELLS: Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Name and phone nkrnber of contact to supply weekly progress data ...... Additional requirements ............................................. W Addition~remarks' UM MERIDIAN' SM WELL TYPE' Red ri 11 Inj Rev INITIAL GEOL UNIT ON/OFF POOL CLASS STATUS AREA ~ SHORE m g Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effod has been made to chronologically organize this category of information. Tape Subtile ~ is type: LIS TAPE HEADER POINT MCINTYRE UNIT OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD RUN1 6048.00 R. ECK C. ALONZO P2 - 46 500292240100 ARCO ALASKA INCORPORATED ATLAS WIRELINE SERVICES 05-OCT-93 RUN2 RUN3 14 12N 14E 412 1290 53.50' 41.00 9.00 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING 12.250 REMARKS: 13.375 3708.0 9300.0 DIFL/CN/ZDL/GR CIRCULATION STOPPED @ 21:00 26-SEP-93. NEUTRON LOG PARAMETERS: SANDSTONE MATRIX CALIPER CORRECTED CHISM FILTERING NOT ACTIVE. $ FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLE MAIN PASS All tool strings with depth shifted and clipped curves; (including cased hole). DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE GR DIL 2435 SDN $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA START DEPTH STOP DEPTH 6485.0 9240.0 6543.0 9298.0 8590.0 9247.0 8590.0 9265.0 GR (MEASURED DEPTH) BASELINE DEPTH LL8 6463.0 6463.0 6547.5 6555.5 6555.5 6580.5 6580.0 6585.0 6585.0 6601.0 6601.0 6608.0 6607.0 6613.5 6613.5 6619.0 6619.5 6619.5 6619.5 6654.0 6654.0 6654.0 6669.5 6669.0 6685.0 6685.0 6691.5 6691.0 6692.0 6761.5 6761.5 6768.5 6768.0 6770.0 6770.0 6780.0 6780.0 6779.5 6817.5 6817.5 6854.5 6854.5 6861.0 6861.0 6860.5 6901.5 6901.0 6901.5 6945.5 6945.5 6951.0 6951.0 6951.5 6951.0 6995.0 6994.5 7092.0 7092.0 7119.0 7119.0 7137.5 7136.5 7156.5 7155.5 7349.5 7349.0 7423.5 7423.0 7485.0 7485.0 7484.0 7555.0 7554.5 7615.5 7614.5 7655.0 7655.0 7737.0 7736.5 7749.0 7749.0 7750.0 7749.0 7900.5 7900.5 7899.5 EQUIVALENT UNSHIFTED DEPTH ILM RHOB NPHI 6463.0 6463.0 6463.0 6547.5 all runs merged 8030.5 8091.5 8115.5 8117.0 8140.0 8147.0 8147.5 8190.5 8256.5 8257.0 8290.5 8291.5 8346.5 8365.5 8383.0 8418.5 8421.5 8502.0 8505.5 8527.0 8549.5 8614.5 8624.5 8628.0 8628.5 8630.0 8635.5 8638.5 8646.0 8646.5 8651.5 8652.0 8654.0 8656.0 8673.0 8677.0 8687.5 8692.5 8696.5 8701.0 8706.5 8717.0 8727.5 8732.0 8755.5 8772.0 8775.0 8781.0 8784.5 8787.5 8795.5 8798.0 8801.0 8804.0 8807.5 8808.0 8815.0 8819.0 8833.5 8847.0 8527.0 8549.5 8624.5 8627.5 8635.5 8646.5 8652.0 8673.5 8677.0 8787.5 8807.5 8819.0 8030.0 8091.5 8114.5 8116.0 8139.5 8146.5 8147.5 8189.5 8255.5 8256.5 8290.0 8290.5 8345.5 8365.0 8382.5 8418.0 8421.0 8501.0 8504.5 8526.5 8549.0 8614.0 8629.5 8646.5 8651.5 8672.5 8677.0 8696.0 8732.0 8833.0 8624.0 8628.0 8637.5 8652.0 8654.5 8656.5 8677.0 8692.0 8701.0 8781.0 8785.5 8787.5 8795.0 8798.0 8801.0 8803.5 8808.0 8815.5 8820.0 8847.5 8625.0 8629.0 8637.5 8652.0 8654.5 8656.5 8678.0 8688.0 8692.0 8701.0 8706.5 8717.5 8728.0 8756.0 8772.0 8776.0 8781.0 8784.5 8787.5 8795.0 8798.0 8801.0 8803.5 8808.0 8815.5 8820.0 8847.5 8851.0 8854.0 8855.5 8857.0 8860.0 8864.5 8871.0 8871.5 8872.0 8882.0 8894.0 8901.5 8903.0 8905.0 8917.5 8923.5 8927.5 8929.5 8946.0 8952.0 8957.5 8960.5 8962.5 8963.0 8965.0 8966.0 8983.0 8987.0 8988.0 8993.0 8996.0 8998.0 8998.5 9002.5 9018.5 9044.0 9051.0 9052.0 9066.5 9067.0 9069.0 9070.0 9072.0 9074.0 9083.0 9085.0 9086.0 9086.5 9088.0 9093.5 9094.5 9098.0 9099.5 9100.5 9107.0 9107.5 9113.0 9119.0 9123.5 9125.5 8853.5 8855.0 8857.0 8859.5 8864.0 8871.0 8894.0 8905.0 8957.5 9043.5 9051.0 9112.5 8850.5 8856.0 8871.0 8916.5 8963.5 8964.5 8982.5 8986.5 8987.0 9042.5 9065.5 9066.5 9068.5 9069.0 9084.0 9084.5 9086.5 9091.0 9097.0 9107.0 9124.5 8859.5 8870.5 8893.5 8902.0 8958.0 8962.5 8992.5 8998.0 9052.0 9074.0 9113.0 9123.0 8859.5 8870.5 8882.5 8893.5 8903.0 8923.5 8927.0 8928.5 8946.0 8952.0 8958.0 8961.5 8963.0 8965.5 8994.5 8997.0 9002.0 9018.0 9052.0 9071.5 9083.0 9087.0 9095.5 9098.5 9100.5 9107.0 9118.0 9123.0 9155.0 9182.0 9192.5 9207.0 9211.5 9228.0 9279.5 9291.5 9319.0 $ MERGED DATA SOURCE LDWG TOOL CODE GR DIL 2435 SDN $ REMARKS: CN WN FN COUN STAT 9211.0 9181.0 9192.5 9155.0 9193.0 9207.5 9228.0 9228.0 9279.0 9290.0 9319.0 9319.0 9319.0 9319.0 RUN NO. PASS NO. MERGE TOP 1 5 6485.0 1 5 6543.0 1 5 8590.0 1 5 8590.0 MAIN PASS. TENS & TEND WERE SHIFTED WITH LL8. ILD, VILD, & SP WERE SHIFTED WITH ILM. DRHO, PEF, & CALl WERE SHIFTED WITH RHOB. FUCT & NUCT WERE SHIFTED WITH NPHI. $ : ARCO ALASKA INCORPORATED : P2 - 46 : POINT MCINTYRE : NORTH SLOPE : ALASKA MERGE BASE 9240.0 9298.0 9247.0 9265.0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 15 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 GR DIL 68 1 GAPI LL8 DIL 68 1 OHMM ILM DIL 68 1 OHMM ILD DIL 68 1 OHMM SP DIL 68 1 MV VILD DIL 68 1 MV TEND DIL 68 1 LB TENS DIL 68 1 LB NPHI 2435 68 1 PU-S FUCT 2435 68 1 CPS NUCT 2435 68 1 CPS RHOB SDN 68 1 G/C3 DRHO SDN 68 1 G/C3 PEF SDN 68 1 BN/E CALl SDN 68 1 IN 4 55 965 57 0 4 50 746 76 1 4 50 746 76 1 4 50 746 76 1 4 50 746 76 1 4 50 746 76 1 4 50 746 76 1 4 50 746 76 1 4 98 211 23 1 4 98 211 23 1 4 98 211 23 1 4 22 779 91 0 4 22 779 91 0 4 22 779 91 0 4 22 779 91 0 * DATA RECORD (TYPE# 0) Total Data Records: 381 966 BYTES * 60 Tape File Start Depth = 9319.000000 Tape File End Depth = 6463.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 91409 datums Tape Subfile: 2 633 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW OPEN HOLE MAIN PASS Composite of all curves and log header data from all tool strings for a single run; Run #1 presented first followed by separate files for any other subsequent runs. RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY 1 1 5 0.2500 VENDOR TOOL CODE START DEPTH GR 6478.0 DIFL 6536.0 2435 8590.0 ZDL 8590.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): STOP DEPTH 9251.0 9309.0 9258.0 9274.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MODL GR CN PCM ZDL KNJT TEMP PCM DIFL $ CABLEHEAD TENSION MODAL SUB GAMMA RAY COMPENSATED NEUTRON PULSE CODE MODULATOR Z-DENSITY KNUCKLE JOINT TEMPERATURE PULSE CODE MODULATOR DUAL INDUCTION BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) 27-SEP-93 FSYS REV. J001 VER. 1.1 2100 26-SEP-93 6 27-SEP-93 9300.0 9301.0 6550.0 9298.0 1800.0 TOOL NUMBER 3974XA 3517NA 1309XA 2435XA 3508EA 2222EA/2222MA 3921NA 2806XA 3506XA 1503XA 12.250 3708.0 0.0 LSND 9.90 44.0 10.1 6.0 145.0 MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: 3.270 1.150 2.630 0.000 3.090 0.000 51.0 145.0 46.0 0.0 45.0 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 0.000 TOOL STANDOFF (IN): 1.5 REMARKS: MAIN PASS. NEUTRON IS CALIPER CORRECTED & CHISM FILTERING IS NOT ACTIVE. $ CN WN FN COUN STAT : ARCO ALASKA INCORPORATED : P2 - 46 : POINT MCINTYRE : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 19 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 GR DIFL 68 1 GAPI RFOC DIFL 68 1 OHMM RILM DIFL 68 1 OHMM RILD DIFL 68 1 OHMM SP DIFL 68 1 MV VILD DIFL 68 1 MV TTEN DIFL 68 1 LB CHT DIFL 68 1 LB SPD DIFL 68 1 F/MN CNC 2435 68 1 PU-S CNCF 2435 68 1 PU-S CN 2435 68 1 PU-L LSN 2435 68 1 CPS SSN 2435 68 1 CPS ZDEN ZDL 68 1 G/C3 PORZ ZDL 68 1 PU-S ZCOR ZDL 68 1 G/C3 PE ZDL 68 1 BN/E CAL ZDL 68 1 IN 4 67 456 14 5 4 27 515 24 6 4 06 213 78 0 4 04 903 06 0 4 53 419 67 0 4 04 522 10 6 4 78 867 34 0 4 78 867 34 0 4 13 331 34 0 4 98 211 23 1 4 98 211 23 1 4 52 326 75 5 4 84 023 70 1 4 83 368 34 1 4 52 443 33 1 4 46 370 25 1 4 09 884 61 1 4 76 731 33 1 4 24 115 90 6 76 * DATA RECORD (TYPE# 0) Total Data Records: 953 966 BYTES * Tape File Start Depth = 9319.000000 Tape File End Depth = 6463.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 228501 datums Tape Subfile: 3 1034 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW OPEN HOLE REPEAT PASSES Composite of all curves and log header data from all tool strings for a single run; Multiple repeat passes for individual tool strings, if they exist, follow in a separate file. Run #1 presented first followed by separate files for any other subsequent runs. RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY 1 1 4 0.2500 VENDOR TOOL CODE START DEPTH GR 8540.0 DIFL 8593.0 2435 8606.0 ZDL 8566.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): STOP DEPTH 9247.0 9305.0 9254.0 9270.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MODL GR CN PCM ZDL KNJT TEMP PCM DIFL $ CABLEHEAD TENSION MODAL SUB GAMMA RAY COMPENSATED NEUTRON PULSE CODE MODULATOR Z-DENSITY KNUCKLE JOINT TEMPERATURE PULSE CODE MODULATOR DUAL INDUCTION BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3) : MAXIMUM RECORDED TEMPERATURE (DEGF) : 27-SEP-93 FSYS REV. J001 VER. 1.1 2100 26-SEP-93 2349 27-SEP-93 9300.0 9301.0 6550.0 9298.0 1800.0 TOOL NUMBER 3974XA 3517NA 1309XA 2435XA 3508EA 2222EA/2222MA 3921NA 2806XA 3506XA 1503XA 12.250 3708.0 0.0 LSND 9.90 44.0 10.1 6.0 145.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: 3.270 1.150 2.630 0.000 3.090 0. 000 51.0 145.0 46.0 0.0 45.0 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 0.000 TOOL STANDOFF (IN) : 1.5 REMARKS: REPEAT PASS. NEUTRON IS CALIPER CORRECTED & CHISM FILTERING IS NOT ACTIVE. $ CN WN FN COUN STAT : ARCO ALASKA INCORPORATED : P2 - 46 : POINT MCINTYRE : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 19 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 GR DIFL 68 1 GAPI RFOC DIFL 68 1 OHMM RILM DIFL 68 1 OHMM RILD DIFL 68 1 OHMM SP DIFL 68 1 MV VILD DIFL 68 1 MV TTEN DIFL 68 1 LB CHT DIFL 68 1 LB SPD DIFL 68 1 F/MN CNC 2435 68 1 PU-S CNCF 2435 68 1 PU-S CN 2435 68 1 PU-L LSN 2435 68 1 CPS SSN 2435 68 1 CPS ZDEN ZDL 68 1 G/C3 PORZ ZDL 68 1 PU-S ZCOR ZDL 68 1 G/C3 PE ZDL 68 1 BN/E CAL ZDL 68 1 IN 4 4 67 456 14 5 4 4 27 515 24 6 4 4 06 213 78 0 4 4 04 903 06 0 4 4 53 419 67 0 4 4 04 522 10 6 4 4 78 867 34 0 4 4 78 867 34 0 4 4 13 331 34 0 4 4 98 211 23 1 4 4 98 211 23 1 4 4 52 326 75 5 4 4 84 023 70 1 4 4 83 368 34 1 4 4 52 443 33 1 4 4 46 370 25 1 4 4 09 884 61 1 4 4 76 731 33 1 4 4 24 115 90 6 76 * DATA RECORD (TYPE# 0) Total Data Records: 274 966 BYTES * Tape File Start Depth = 9319.000000 Tape File End Depth = 8500.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 156950 datums Tape Subfile: 4 356 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 5 is type: LIS 93/10/ 5 01 **** REEL TRAILER **** 93/10/ 7 01 Tape Subfile: 5 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Thu 7 OCT 93 2:09p Elapsed execution time = 57.01 seconds. SYSTEM RETURN CODE = 0