HomeMy WebLinkAbout202-046Suspended Well Inspection Review Report Reviewed By:
P.I. Suprv
Comm ________
JBR 07/26/2024
InspectNo:susRCN240619193330
Well Pressures (psi):
Date Inspected:6/17/2024
Inspector:Bob Noble
If Verified, How?LAT / LONG
Suspension Date:3/31/2002
#302-385
Tubing:100
IA:400
OA:200
Operator:Hilcorp North Slope, LLC
Operator Rep:Andy Ogg
Date AOGCC Notified:6/16/2024
Type of Inspection:Subsequent
Well Name:PRUDHOE BAY UNIT Y-37A
Permit Number:2020460
Wellhead Condition
Lines Blinded, No leaks or drips, Master was closed. Gauges installed. Wellhouse installed.
Surrounding Surface Condition
Good clean gravel.
Condition of Cellar
Clean ice and water.
Comments
Supervisor Comments
Photos (5) attached
Suspension Approval:Sundry
Location Verified?
Offshore?
Fluid in Cellar?
Wellbore Diagram Avail?
Photos Taken?
VR Plug(s) Installed?
BPV Installed?
Friday, July 26, 2024
2024-0617_Suspend_PBU_Y-37A_photos_bn
Page 1 of 3
Suspended Well Inspection – PBU Y-37A
PTD 2020460
AOGCC Inspection Rpt # susRCN240619193330
Photos by AOGCC Inspector B. Noble
6/17/2024
2024-0617_Suspend_PBU_Y-37A_photos_bn
Page 2 of 3
2024-0617_Suspend_PBU_Y-37A_photos_bn
Page 3 of 3
7. Property Designation (Lease Number):
1. Operations
Performed:
2. Operator Name:
3. Address:
4. Well Class Before Work:5. Permit to Drill Number:
6. API Number:
8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
Susp Well Insp
Install Whipstock
Mod Artificial Lift Perforate New Pool
Perforate
Plug Perforations
Coiled Tubing Ops
Other Stimulate
Fracture Stimulate
Alter Casing
Pull Tubing
Repair Well Other:
Change Approved Program
Operations shutdown
11. Present Well Condition Summary:
Casing Length Size MD TVD Burst Collapse
Exploratory
Stratigraphic
Development
Service
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
16. Well Status after work:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
OIL GAS
WINJ WAG GINJ
WDSPL
GSTOR Suspended SPLUG
Authorized Name and
Digital Signature with Date:
Authorized Title:
Contact Name:
Contact Email:
Contact Phone:
PBU Y-37A
Hilcorp North Slope, LLC
3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503
202-046
50-029-22403-01-00
12225
Conductor
Surface
Intermediate
Production
Liner
8979
80
3340
10621
160
9651
20"
10-3/4"
7-5/8"
5-1/2"
7951
33 - 113
32 - 3372
30 - 10651
10491 - 10651
33 - 113
30 - 8867
8715 - 8867
9315
470
4790
6280
9651
1490
6890
7740
None
4-1/2" 12.6# 13Cr80 27 - 10493
Structural
4-1/2" Baker SABL-3 Packer
10428
8655
Torin Roschinger
Operations Manager
Andy Ogg
andrew.ogg@hilcorp.com
907-659-5102
PRUDHOE BAY, PRUDHOE OIL
Total Depth
Effective Depth
measured
true vertical
feet
feet
feet
feet
measured
true vertical
measured
measured
feet
feet
feet
feet
measured
true vertical
Plugs
Junk
Packer
Measured depth
True Vertical depth
feet
feet
Perforation depth
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV
(type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13a.Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Exploratory Development Service StratigraphicDaily Report of Well Operations
Copies of Logs and Surveys Run
Electronic Fracture Stimulation Data
Sundry Number or N/A if C.O. Exempt:
ADL 0028287, 0047471
27 - 8716
N/A
N/A
250
400
0
100
N/A
13b. Pools active after work:PRUDHOE OIL
No SSSV Installed
10428. 8655
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Sr Pet Eng: Sr Pet Geo:
Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov
Sr Res Eng:
Due Within 30 days of Operations
By Grace Christianson at 8:57 am, Jun 25, 2024
Digitally signed by Torin
Roschinger (4662)
DN: cn=Torin Roschinger (4662)
Date: 2024.06.25 04:37:21 -
08'00'
Torin
Roschinger
(4662)
RBDMS JSB 062724
DSR-6/26/24WCB 9-10-2024
ACTIVITY DATE SUMMARY
6/17/2024
T/I/O = 100/400/200. Temp = SI. AOGCC suspended well inspection. State
witnessed by Bob Noble. Pictures taken.
MV = LOTO. IA, OA = OTG. 8:45
Daily Report of Well Operations
PBU Y-37A
AOGCC suspended well inspection. State
witnessed by Bob Noble. Pictures taken.
Operator Name:2.
Development Exploratory
Service
5
Permit to Drill Number:202-046
6.50-029-22403-01-00
PRUDHOE BAY, PRUDHOE OIL
BP Exploration (Alaska), Inc 5.
Well Name and Number:8.
10.Field/Pools:
Well Class Before Work4.
Present Well Condition Summary:11.
Total Depth: measured feet
feet
Plugs measured feet
feet
Effective Depth: measured feet
feet
Packer measured feet
feettrue vertical true vertical
12225
9651
7951
10428
9315
9651
8655
Casing: Length: Size: MD: TVD: Burst: Collapse:
Structural
Conductor 80 20" 33 - 113 33 - 113 1490 470
Surface 3339 10-3/4" 33 - 3372 33 - 3228 5210 2480
Intermediate 10621 7-5/8" 30 - 10651 30 - 8867 6890 4790
Production
Perforation Depth: Measured depth: None
feet
True vertical depth: feet
Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# 13Cr80 27 - 10493 27 - 8716
10428 8655Packers and SSSV (type, measured and
true vertical depth)
4-1/2" Baker SABL-3 Packer
Liner 160 5-1/2" 10491 - 10651 8715 - 8867 7740 6280
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Suspended
Representative Daily Average Production or Injection Data
Prior to well operation:
Subsequent to operation:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact Name:
Contact Email:
Sternicki, Oliver R
Oliver.Sternicki@bp.com
Authorized Name:Lastufka, Joseph N
Authorized Title:
Authorized Signature with Date:Contact Phone:+1 907 564 4301
Treatment descriptions including volumes used and final pressure:
13.
SIM Specialist
Operations Performed1.
Abandon Plug Perforations Fracture Stimulate Pull Tubing
GSTOR WINJ WAG GINJ SUSP 5 SPLUG
16. Well Status after work:Oil Gas
Exploratory Development 5 Stratigraphic
15. Well Class after work:
Service
WDSPL
14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283)
Daily Report of Well Operations
Copies of Logs and Surveys Run
true vertical measured8979
Sundry Number or N/A if C.O. Exempt:
320-235
Junk
Packer
Printed and Electronic Fracture Stimulation Data
Renew Suspension
Operations shutdown
Change Approved Program
5
Senior Pet Engineer:Senior Res. Engineer:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
Suspend Perforate Other Stimulate Alter Casing
Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well
3.Address: P.O. Box 196612 Anchorage,
AK 99519-6612
7.Property Designation (Lease Number):ADL 028287 & 047471 PBU Y-37A
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
Stratigraphic
Other:
API Number:
Form 10-404 Revised 03/2020 Submit Within 30 days of Operations
By Samantha Carlisle at 8:29 am, Jun 19, 2020
Joseph N Lastufka Digitally signed by Joseph N Lastufka
Date: 2020.06.18 16:43:03 -08'00'
RBDMS HEW 6/19/2020
MGR26JUN20 DSR-6/22/2020
SFD 6/22/2020
Operator Name:2.
Exploratory Development
Service
5
Permit to Drill Number:202-046
6.API Number:50-029-22403-01-00
PRUDHOE BAY, PRUDHOE OIL
BP Exploration (Alaska), Inc 5.
Field/Pools:9.
Well Name and Number:
ADL 047471
Property Designation (Lease Number):10.
8.
PBU Y-37A
7.If perforating:
What Regulation or Conservation Order governs well spacing in this pool?
Will planned perforations require a spacing exception?
Stratigraphic
Current Well Class:4.
Type of Request:1.Abandon Plug Perforations Fracture Stimulate Repair Well
Operations shutdown
Renew Suspension
Op Shutdown
GAS
GSTOR WAG
SPLUG
Abandoned
Oil WINJ
Exploratory Development 5Stratigraphic Service
WDSPL
12. Attachments:
PRESENT WELL CONDITION SUMMARY
12225
Effective Depth MD:
13Cr80
11.
June 30, 2020
Commission Representative:
15.
Suspended 5
Contact Name: Mcmullen, John C
Contact Email: John.McMullen@bp.com
Authorized Name: Mcmullen, John C
Authorized Title:Well Interventions Superintendent Special Projects
Authorized Signature:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other:
Yes No Spacing Exception Required?Subsequent Form Required:
Approved by:COMMISSIONER
APPROVED BYTHE
COMMISSION Date:
5OtherAlter Casing
Pull Tubing
Conditions of approval: Notify Commission so that a representative may witness Sundry Number:
COMMISSION USE ONLY
17. I hereby certify that the foregoing is true and the procedure approved herein will not
be deviated from without prior written approval.
Detailed Operations Program
Packers and SSSV Type:
No SSSV Installed
Packers and SSSV MD (ft) and TVD (ft):
Perforation Depth MD (ft):Tubing Size:
Size
Total Depth MD (ft):Total Depth TVD(ft):
8979
Effective Depth TVD:Plugs (MD):Junk (MD):
Other Stimulate
Re-enter Susp Well
Suspend
Plug for Redrill
Perforate
Perforate New Pool
10428 / 8655
No SSSV Installed
Date:
Liner 160 5-1/2" 10491 - 10651 8715 - 8867 7740 6280
Well Status after proposed work:
16. Verbal Approval:
Change Approved Program
33 - 3372 33 - 3228
14. Estimated Date for Commencing Operations:
BOP Sketch
33 - 113
Structural
6890
Proposal Summary 13. Well Class after proposed work:
4-1/2" Baker SABL-3 Packer
None 4-1/2" 12.6#27 - 10493
Production
9651 7951 9651 9315
33 - 113 470
10-3/4"
7-5/8"
Contact Phone:+1 9075644711
Date:
4790
80 149020"Conductor
2480
GINJ
5
Post Initial Injection MIT Req'd? Yes No
5
Comm.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
Surface 3339 5210
Intermediate 10621 30 - 10651 30 - 8867
Address:P.O. Box 196612 Anchorage, AK
99519-6612
3.
No 5Yes
Casing Length MD TVD Burst
Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft):
Collapse
MPSP (psi):
Wellbore Schematic
Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng
Form 10-403 Revised 03/2020 Approved application is valid for 12 months from the date of approval.
By Samantha Carlisle at 2:20 pm, Jun 02, 2020
320-235
Mcmullen, John C Digitally signed by Mcmullen, John C
Date: 2020.06.02 13:25:18 -08'00'
DLB 6/3/2020
; ADL 0028287 (Surface) DLB
X
DSR-6/2/2020
10-404
MGR12JUN20
*Per 20 AAC 25.110 Suspended Wells: (e) Next inspection shall be conducted 24 months before September 30, 2025.
*Variance request to 20 AAC 25.110 Suspended Wells (c) is approved
Yes Required?
C
6/15/2020
dts 6/15/2020 JLC 6/15/2020
RBDMS HEW 6/16/2020
BP Exploration (Alaska) Inc.
John McMullen., BPXA Well Integrity and Interventions Manager
Post Office Box 196612
Anchorage, Alaska 99519-6612
May 26, 2020
Mr. Jeremy Price
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Anchorage, Alaska 99501
Subject: Prudhoe Bay Well Y-37A (PTD #202046)
Application for Renewal of Existing Suspension (10-403)
Dear Mr. Price,
BP Exploration (Alaska) Inc. completed an AOGCC witnessed suspended well
inspection of Prudhoe Bay Unit well Y-37A on 09/15/2019 (20 AAC 25.110 (h). This
recently submitted suspended well inspection reflects the current condition of the well
(reference 20 AAC 25.110 (f)) and supports the request for renewal of suspension.
Recent events from this well indicate that this well is mechanically sound. Specific
attachments include:
x Wellbore diagram illustrating the current configuration of the well
x Suspended Well Site Inspection form documenting the pressures and site
condition
Prudhoe Bay Unit well Y-37A was suspended on 03/31/2002. It is located on a pad with
active wells and/or service wells. The strata through which the well was drilled is
neither abnormally geopressured or depleted. The well is mechanically sound and
secured with the top of cement at 10650’ in the 5-1/2” tubing and 9651’ in the 2-3/8” coil.
Based on these conditions and the inspection on 09/15/2019 Prudhoe Bay Unit well Y-
37A meets the provisions required in 20 AAC 25.110 (a)(1).
BPXA requests approval for renewal of the existing suspension status for this well.
Attached is an Application for Sundry Approval (10-403) with a technical justification
summarizing the information on the current status and condition of the well (reference
20 AAC 25.110 (a), (b), (e), (h)).
In summary, BPXA believes Prudhoe Bay well Y-37A is mechanically sound and secure
and meets the requirements for renewal of suspended status.
If you have any questions, please call me at 529-9129 or Ryan Holt/ Andrew Ogg at
659-5102.
Sincerely,
John McMullen
BPXA Well Integrity and Interventions Manager
Attachments
Technical Justification
2019 Suspended Well Site Inspection form
Wellbore Schematic
Prudhoe Bay Well Y-37A (PTD #202046)
Technical Justification for Renewal of Suspended Status
May 26, 2020
Well History and Status
Prudhoe Bay Unit well Y-37A (PTD #202046) was suspended on 03/31/2002 after a
failed coil tubing sidetrack attempt. Coiled tubing parted at surface and was partially
cemented in place during an operation to lay in a 7 barrel kickoff plug. After fishing
operations ended, 2135' of 2-3/8" coil tubing/BHA were left in the well. The top of the
fish is located at 9315' MD, the kick-off point is at 10651' MD. The coil tubing fish is
cemented from 11450' back through the window to 10650' and cement was also left
within the CT fish.
The well is mechanically sound as proven on 02/28/2002 when a pre-CTD rig
MIT-IA was performed to 2500 psi, as well as the cemented coil fish with cement from
11450' back through the window at 10650'. The well will not allow the migration of fluids,
will not damage freshwater or producing or potentially producing formations, will not
impair the recovery of oil or gas, and is secure, safe, and not a threat to public health.
The strata through which the well was drilled is neither abnormally geo-pressured or
depleted.
Condition of the Wellhead and Surface Location
Prudhoe Bay Unit well Y-37A is located on an active, well maintained pad with clean
gravel. The pit and surrounding area are in good condition. There is no discoloration
and no sheens on the pad, pits, or in nearby water.
The well pressure readings are T/I/O = -/250/200 psi.
Request
BPXA requests approval for renewal of the existing suspension status for Y-37A.
A variance to the provisions of 20 AAC 25.110 (c) (2) is also requested under 20 AAC
25.112 (i) to allow the well to remain as suspended in its current condition. All
hydrocarbon intervals are isolated and there are no underground sources of fresh water
in this area.
F,' -I,
STATE OF ALASKA !
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Performed '...
Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑
Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑
Plug for Rednll ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Suspend Inspection 0
2. Operator Name: BP Exploration (Alaska), Inc
4. Well Class Before Work
Development 171 Exploratory ❑
5. Permit to Drill Number 202-046
3. Address: P.O. Box 196612 Anchorage,
AK 99519-5512
Stratigraphic ❑ Service ❑
1 6. API Number: 50-029-22403-01-00
7. Property Designation (Lease Number): ADL 047471
8. Well Name and Number: PBU Y -37A
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
10. Field/Pools:
PRUDHOE BAY, PRUDHOE OIL
11. Present Well Condition Summary:
Total Depth: measured 12225 feet Plugs measured 9651 feet
true vertical 8979 feet Junk measured 9315 feet
Effective Depth: measured 9651 feet Packer measured 10428 feet
true vertical 7951 feet Packer true vertical 8655 feet
Casing: Length: Size: MD: TVD: Burst: Collapse:
Structural
Conductor 80 20" 33-113 33-113 1490 470
Surface 3339 10-3/4" 33-3372 33-3228 5210 2480
Intermediate 10621 7-5/8" 30-10651 30-8867 6890 4790
Production
Liner 160 5-1/2" 10491 - 10651 8715-8867 7740 6280
Perforation Depth: Measured depth: None feet
True vertical depth: feet
Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr80 27-10493 27-8716
Packers and SSSV (type, measured and 4-112" Baker SABL-3 Packer 10428 8655
true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil -Bbl
Gas-Mcf
Water -Bbl
Casing Pressure
Tubing Pressure
Prior to well operation:
Suspended
Subsequent to operation:
14. Attachments: (required per 20 nec 25 070.25 071, &25 283)
15. Well Class after work:
Daily Report of Well Operations Rl
Exploratory ❑ Development 71 Service ❑ Stratigraphic ❑
Copies of Logs and Surveys Run ❑
16. Well Status after work: Oil ❑ Gas ❑ WDSPL ❑
Printed and Electronic Fracture Stimulation Data ❑
GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP 9 SPLUG ❑
17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
N/A
Authorized Name. Lastufka, Joseph N Contact Name: Montgomery, Travis J
Authorized Title: (21 IM Speci Contact Email: Travis. Montgomery(o]bp.com
Authorized Signature: Date: IQ (aContact Phone: +1 907 564 4127
Form 10-404 Revised 04/2017 /l#1v1,/i '11;wy " 3BDMS_L1f0OCT 1 12019 Submit Original Onty
Daily Report of Well Operations
PBU Y -37A
3/30/2019
T/1/0=35/250/200 LTT master valve passed
T/I/O = SSV/250/200. Temp = SI. AOGCC SU Inspection (Regulatory Compliance). State
witnessed by Jeff Jones. Pictures taken. Will need to stop by and remove a thermal blanket,
wood, and electrical bands from inside and around well house.
9/15/2019
MV = LOTO. IA, OA = OTG. 09:00
Suspended Well Site Inspection Form Initial Inspection
Notify AOGCC Inspectors at least 10 days prior to inspection to allow witness
Well Name: Y -37A Field/Pool: Prudhoe Bay/ Prudhoe Oil
Permit # (PTD): 2020460 API Number: 50-029-22403-01
Operator: BP EXPLORATION (ALASKA) INC Date Suspended: 3/31/2002
Surface Location: Section: 33 Twsp: 11N Range: 13E
Nearest active pad or road: Y access road
Take to Location
Digital camera
Brief well history
Latest Sundry or Completion report
Past Site Visit documentation
Pressure gauges, fittings, tools
Map showing well location /Aerial photos
Wellbore diagram showing downhole condition
Site clearance documentation
Sample containers for fluids on or near pad
Condition of Surface Location AOGCC requires:
1) a description of the condition of the surface location, including discoloration, fluids or sheens visible
on the ground or in any nearby water,
2) photographs showing the condition of the location surrounding the well
General location condition:
Pad or location surface: —('-I e
Location cleanup needed:
Pits condition:
Surrounding area conditic
Water/fluids on pad:
Discoloration, Sheens on
Samples taken: None
Photographs taken (# and
Condition of Wellhead AOGCC requires:
1) a description of the condition of the wellhead, 2) well pressure readings, where practicable,
3) photographs showing the wellhead condition
Wellhead/tree/valve description, condition:;
Cellar description, condition
Rat Hole:
Wellhouse or protectivd bar
Well identification sign:
Tubing Pressure (or casing
Annulus pressures:
Wellhead Photos taken (# a
Work Required: None
fluids:
Operator Rep (name an signature): Josh Prowant��%<
AOGCC Inspector: �P-(_ Other Oo rvers:
Inspection Date: 9/11/2019 AOGCC Notice Date:
Time of arrival: / 14 a 6 Time of Departure:
Site access method: Access road
9/13/2019
■
:Ajaa -
1,
46-
3$ _ Y-23
1
23APE1
1
-
,
—
28Y -17A
A A-07 25
—
Y-0,9-':� Y-04 ,
!
- 02 —_ Y-15 (% A -29A
Y-08APB1 Y -03A
X�2AP61 t:-Y:15A A=11
Y-02A:�Y-19A I ,.
A25LII A4:12A
A-WU PBS r A -2y. Q
C 1=19
A AA3
.� "Y-31
I AD'�- Y--
-_._.
S A 39A
C A-10
C Y-19 Y-23
C A-33 A DAD
Y31) 1
C PR331113
" �Y;09ACvh
._
-30LI a Y-07
X26 Y-17BPB1a5
M
I
Y -11H -''' -12
_A05
- -
v,34
-'Y+3A
-13APE:1
C Y -11A ..
i 6 A-14
14
.� Y -2,4A
Y-71
,=.
Y 14 Y-10BP
j A-40
C Y -14C '..°1-10BPB1
Y -14E 'Y-16 82
� Y-85
Y-95
A -05A
Y-37 A-15
Y --21.A
Y-08APB1�,
18P81
Y-21 Y-37AP81
' Y-09AP -
'... Y-3"1
I Y-05SPB1
C -A418
- 'Y 5A
C-- X21B _
_
Y -05B
� � Yj-0SAP82
Y -11C (
Y J Y -U8
4, PLAGHNI
l + A
- 2.
(7l A -16A 6 A-37
C YK32
Cf
..
-32L7
V -G4
A_ A38LI
!
( GETTY-01 A M8. l PB1
ii Y -29A i Y-09AL1
f
A-33
C Y -09A
Y -20A
pY-09AL1-01
TRFF= 4-1/1R"S1u1!M/
120^ CONDUCTOR, 91.50, H-40, ID =19.124" —t 113'
10-3/4" CSG, 45.5#, NT -80 BUTT, D = 9.950" 3372`
L2-318"
inimum ID = FISH @ 9315'
CHEM CUT CQIL TBG
1 I OP OF 2-3/8^ COL TBG FISH, 4.45#, FF90 I
GUUE TOOL SEr ON COL 4-1/2 GFN (INCH) 9327'
SAFETYNOTES: DURINGY-37ASOTRKOPS,
—2135' OF2-3/8" COIL TBG! BHA WAS LEFT IN
WELL AFTER COIL PARTED. TOP OF FISH @ 9315'
(CHEM CUT). BTM OF FISH @ 11450'.' SEE CTD
REPORTS FOR ADDITIONAL INFO.
4-12" TBG, 12.6#, 13CR NSCT,
.0152 bpf, ID=3.958"
I TOP OF 5-12^ LNR I
5/8" CSG SF1DE 10630 O
5-12" LNR, 17#, 13CR-80 NSCC, I —10650
0232 bpf, D=4.892"
Y 3 7A SAFETY NOTES: WELL ANGLE> 700 @ 10780'
*** 4-12" CHROME TBG & 5-12" CHROME LNR
*** COIL TBG RSH IN HOLE @ 9315'. SEE SAFETY
SUSPENDED BOX BELOW FOR DETAILS.
7-518" CSG, 29.7#, NT-95HS NSCC, ID =6.875^ 10651' -
PERFORATION SLINTMRY
Rff LOG:
ANGLE AT TOP PERF:
Note: Refer to Production DB for historical perf data
4-1/2"OTIS SSSV NIP, ID=3.813"
GAS LFT MAN RB -S
6
5M FMC
5031
fALELSON
P
79.1'
BK
49.43'
08/03/13
2100'
Max Angle =
97-0 11861'
Dahxn MD=
10663'
Datum TVD =
8800' SS
120^ CONDUCTOR, 91.50, H-40, ID =19.124" —t 113'
10-3/4" CSG, 45.5#, NT -80 BUTT, D = 9.950" 3372`
L2-318"
inimum ID = FISH @ 9315'
CHEM CUT CQIL TBG
1 I OP OF 2-3/8^ COL TBG FISH, 4.45#, FF90 I
GUUE TOOL SEr ON COL 4-1/2 GFN (INCH) 9327'
SAFETYNOTES: DURINGY-37ASOTRKOPS,
—2135' OF2-3/8" COIL TBG! BHA WAS LEFT IN
WELL AFTER COIL PARTED. TOP OF FISH @ 9315'
(CHEM CUT). BTM OF FISH @ 11450'.' SEE CTD
REPORTS FOR ADDITIONAL INFO.
4-12" TBG, 12.6#, 13CR NSCT,
.0152 bpf, ID=3.958"
I TOP OF 5-12^ LNR I
5/8" CSG SF1DE 10630 O
5-12" LNR, 17#, 13CR-80 NSCC, I —10650
0232 bpf, D=4.892"
Y 3 7A SAFETY NOTES: WELL ANGLE> 700 @ 10780'
*** 4-12" CHROME TBG & 5-12" CHROME LNR
*** COIL TBG RSH IN HOLE @ 9315'. SEE SAFETY
SUSPENDED BOX BELOW FOR DETAILS.
7-518" CSG, 29.7#, NT-95HS NSCC, ID =6.875^ 10651' -
PERFORATION SLINTMRY
Rff LOG:
ANGLE AT TOP PERF:
Note: Refer to Production DB for historical perf data
4-1/2"OTIS SSSV NIP, ID=3.813"
GAS LFT MAN RB -S
6
5767
5031
44
KBMG
DMY
BK
0
08/03/13
5
7685
6410
42
KBMG
DMY
BK
0
0228/02
4
9042
7454
38
KBMG
OMY
BK
0
0228/02
3
10056
8308
25
KBMG
DMY
BK
0
02/28/02
2
10201
8441
21
KBMG
DMY
BK
0
0228/02
1
10306
8540
20
KBMG
DMY
BK
0
0228/02
9651' HTOP OF CEMENT IN 23/8" COIL
7 1!313" f-14-1/2'
PARKER SWS NIP, ID 3.813"
10428'
7-5/8" X 4-1/2' BKR SABL-3 PKR, ®= 3.937"
- 10459'
4-112' PARKER SWS NP, ID 3.813"
10477
4-112' SINN NP,MLL'D TO 3.80" (03/15/02)
10493'
a-12^ WLEG, 0= 3.x58^
10463'ELMD
TT LOGGED 11/10/93
10503'
7-5/8" X 5-12" BKR CTP, TEBACK SLV
PJC DRAWNGCORRECTIONS
& LNRHGR, O=?
5-1/2" MLLOUT WINDOW (Y -37A) 10651'-10658- 1
DATE
REV BY
COMMENTS
DATE
REV BY COMMENTS
laI31193
N1BE
ORIGINAL COMPLETION
05/03/11
MB/JMD SUSPENDED(03)31/02)
03/31102
N3S
CTD SIDETRACK(SUSPENDE_D
05/06H1
PJC DRAWNGCORRECTIONS
04/02102
CFI/TP
CORRECTIONS
08/16/13
STF/JMD GLV C/O 08/03/13
0624/02
JM/KAK
SETGUIDE TOOL
10/08/19
DDIJMD ADD OKB, BF, & COND OEPTF
OSiO3l11
JMD
GLV C/0(0420/02)
10/10/19
JNUJMD MINOR DEPTH EDITS
11450' 1-a BTM OF CT FISH
I3-3/4" OPEN HOLE TD I
PRUDHOE BAY UNIT
WELL: Y -37A
PERMrr No: '2020460
AN No: 50-029-22403-01
T11 N, R1 3E 1425' FNL 8,276- FEL
• •
bp
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
December 20, 2010 ��� JAN "/ 4 ����
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission 0 01
333 West 7 Avenue
Anchorage, Alaska 99501 f� .:. ()t [AIM C :a4Slon
Subject: Corrosion Inhibitor Treatments of GPB Y Pad
Dear Mr. Maunder,
Enclosed please find multiple copies of a spreadsheet with a list of wells from Y Pad
that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Jerry
Murphy, at 659 -5102.
Sincerely,
Torin Roschinger
BPXA, Well Integrity Coordinator
•
• •
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off
Report of Sundry Operations (10 -404)
Date: 12/20/10 •
Corrosion
Well Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Name PTD # API # cement pumped cement date inhibitor sealant date
ft bbls ft na gal
Y -01B 2010760 50029203940200 NA 2.5 NA 8.50 4/11/2010
Y -02A 2011730 50029203950100 NA 0.1 NA 0.85 4/11/2010
Y -03A 2042350 50029204110100 NA 2.2 NA 18.70 4/16/2010
Y -04 1791050 50029204230000 NA 1 NA 5.10 4/11/2010
Y -05B 2081380 50029204360200 NA 3.3 NA 20.40 4/15/2010
Y -06A 2042510 50029204310100 NA 0.7 NA 3.40 4/16/2010
Y -07A 2071050 50029205600100 14.5 2.0 0.3 NA 1.70 8/4/2010
Y -08A 1880560 50029205720100 NA 4 NA 15.30 8/5/2010
Y -09A 1970830 50029205790100 19 1.5 3.6 NA 17.00 8/4/2010
Y -10A 2042500 50029205870100 19 3.0 8.75 NA 54.40 8/6/2010
Y -11C 2051640 50029205130300 NA 0.1 NA 0.90 4/14/2010
Y -13 1811120 50029206340000 NA _ 0.4 NA 3.40 4/15/2010
Y -14B 2011010 50029218320200 NA 3.8 NA 20.40 4/10/2010
Y -15A 2010890 50029209400100 NA 2.1 NA 11.90 4/10/2010
Y -16 1830490 50029209320000 18.8 2.0 1.7 NA 10.20 8/4/2010
Y -18 1830290 50029209160000 NA 0.8 NA 5.10 4/9/2010
Y -19 1880960 50029218570000 NA 0.2 NA 0.85 4/15/2010
Y -20A 2010250 50029215870100 NA 1.5 NA 11.90 4/14/2010
Y -21A 1950370 50029215740100 NA 0.1 NA 1.70 4/13/2010
Y -22A 1881150 50029215580100 NA 0.5 NA 3.40 8/4/2010
Y -23B 2031640 50029215900200 NA 1.2 NA 6.80 4/13/2010
Y -24 1861130 50029216080000 NA 1 NA 6.80 4/12/2010
Y -25A 2081400 50029218830100 NA 0.3 NA 1.70 4/18/2010
Y -26A 2010430 50029221910100 NA 0.3 NA 1.70 4/15/2010
Y -27 1900280 50029220190000 NA 0.5 NA 3.40 4/14/2010
Y -28 1910650 50029221690000 NA 3.5 NA 28.90 4/12/2010
Y -29A _1960910 50029221230100 NA 0.2 NA 1.70 4/13/2010
Y -30 1910150 50029221350000 NA 0.5 NA 2.60 4/13/2010
Y -31 1910560 50029221610000 NA 0.5 NA 3.40 4/12/2010
Y -32 1910410 50029221490000 NA 0.3 _ NA 1.70 4/18/2010
Y -33 1910300 50029221440000 NA 0.9 NA 6.80 4/12/2010
Y -34A 1990040 50029221780100 NA 0.9 NA 5.10 4/11/2010
Y -35A 2022370 50029221860100 NA 1.5 NA 10.20 4/15/2010
Y -36 1931310 50029224000000 NA 0.9 NA 5.95 4/10/2010
r.._> 2020460 50029224030100 NA 0.8 NA 6.00 4/14/2010
STATE OF ALASKA
ALASKA~AND GAS CONSERVATION COMMISS
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate^ Other Q
Performed: Alter Casing ^ Pull Tubing^ Perforate New Pool ^ Waiver^ Time Extension ^ INSPECT
Change Approved Program ^ Operat. Shutdown ^ Perforate ^ Re-enter Suspended Well ^ WELL
2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number:
Name: Development ^~ Exploratory ^ 202-0460
3. Address: P.O. Box 196612 Stratigraphic^ Service ^ 6. API Number:
Anchorage, AK 99519-6612 50-029-22403-01-00
8. Property Designation (Lease Number) : ~. ~` ~ 9. Well Name and Number:
ADLO-047471 "L~~" , f PBUY-37A
10. Field/Pool(s):
PRUDHOE BAY FIELD / PRUDHOE OIL POOL
11. Present Well Condition Summary:
Total Depth measured 12225 feet Plugs (measured) None feet
true vertical 8979.2 feet Junk (measured) 9315 feet
Effective Depth measured 9651 feet Packer (measured) 10428
true vertical 7951.18 feet (true vertical) 8655
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 80 20"91.5# H-40 30 - 110 30 - 110 1490 470
Surface 3342 10-3/4"45.5# NT80LHE 30 - 3372 30 - 3228 5210 2480
Intermediate 10632 7-5/8" 29.7# 'NT95HS 27 - 10659 27 - 8875 8180 5120
Production 160 5-1/2" 17# 13CR80 10491 - 10651 8715 - 8867 7740 6280
Liner
Liner
Perforation depth: Measured depth: NONE -
,
_ ~ ~ rt ,
~ -
_~
True Vertical depth: _ _ _ _ _
Tubing: (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13CR SURFACE - 10492 SURFACE - 8716
Packers and SSSV (type, measured and true vertical depth) 7-5/8"X4-1/2" BKR SABL-3 PKR 10428 8655
~/
12. Stimulation or cement squeeze summary: ~~ ~ ah
p ~
~U(~
Intervals treated (measured):
~ ~ 2Q1~
7././v ~~~~~
~ ~ ~~
~
Treatment descriptions including volumes used and final pressure: `
' ~'1~SSi0n
~~'sf;fi~f!i8
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure
Prior to well operation: SUSPENDED
Subsequent to operation:
14. Attachments: 15. Well Class after work: n
Copies of Logs and Surveys Run Exploratory^ \ elopment Q Service ^
Daily Report of Well Operations X 16. Well Status after we SUSPENDED Oil Gas WDSPL
GSTOR ^ WAG ^ GINJ ^ WINJ ^ SPLUG ^
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
NA
Contact Gary Preble
Printed Name Gary Preble Title Data Management Engineer
Signature Phone 564-4944 Date~~ ~~1~
• •
Prudhoe Bay Unit Well Y-37A, PTD 2020460
Suspended Well Inspection Report
BP Exploration (Alaska) Inc. (BPXA) completed a suspended well inspection of
PBU Y-37A on 7/18/10. The following attachments document the inspection and
the current condition of the well (reference 20 AAC 25.110 (e) and (f)).
• Suspended Well Site Inspection form documenting the well pressures and
site condition. AOGCC inspector Lou Grimaldi waived the opportunity to
witness the inspection.
• Wellbore diagram illustrating the current configuration of the well
• Pad map showing the well location and other wells within one-quarter mile
radius of the surface location
• Photographs showing the condition of the wellhead and the surrounding
location
Additional pertinent information:
• PBU Y-37A was suspended on 3/31/2002.
• PBU Y-37A is located on a pad with active producing wells and/or service
wells.
• The strata through which the well was drilled is neither abnormally geo-
pressured or depleted.
• The well is secured by cement left above any open formation outside and
within a coiled tubing fish during a sidetrack attempt.
• A passing inner annulus pressure test prior to the sidetrack attempt and
the cement left in the wellbore indicates the well is mechanically sound.
The inner annulus pressure (880 psi) noted durin tg he inspection is under
investigation.
MLB 08/17/10
•
Suspended Well Site Inspection Form
Notify AOGCC Inspectors at least 10 days prior to inspection to allow witness
Weil Name: PRUDHOE BAY UMT Y-37A Field/Pool: PRUDNOE BAY / PRUDHOE OIL
Permit # (PTD): 2020460 API Number: 50029224030140
Operator: BP EXPLORATION {ALASKA} INC Date Suspended: 3!31/2002
Surface Location: Section: 33 Twsp: 11 N Range: 13E
Nearest active pad or road: Prudhoe Bay Y-Pad
Take to Location
Digital camera
Brief well history
Latest Sundry or Completion report
Past Site Visit documentation
Pressure gauges, fittings, tools
Map showing well location (Aerial photos
Wellbare diagram showing downhoie condition
Site clearance documentation
Sample containers for fluids on or near pad
Condition of Surface Location AOGCC requires:
1 } a description of the condition of the surface location, including discoloration, fluids or sl•~eens visible
on the ground or in any nearby water,
2}photographs showing the condition of the location surrounding the well
General location condition: Goad
Pad or location surface: Dry
Location cleanup needed: No
Pits condition: Clean water
Surrounding area condition: Good
Water/fluids on pad: No
Discoloration, Sheens on pad, pits or water:
Samples taken: No
Access road condition: Good
Photographs taken (## and description): 3: sign wellhouse and pit.
Condition of Wellhead AOGCC requires:
1 } a description of the condition of the wellhead, 2} well pressure readings, where practicable,
3} photographs showing the wellhead condition
WellheadJtreelvalve description, condition:
Good
Cellar description, condition, fluids: 14" of water - no sheen
Rat Hole: NIA
Wellhouse or protective barriers: Wellhouse
Well identification sign: Yes
Tubing Pressure (or casing if n g . 0 si /
Annulus pressures: lA: 880 ps' A: 210 psi
Wellhead Photos taken (# an ption): 2: #reelwellhead.
Work Required: None
Operator Rep (name and signature): Torin Roschinger ~-'"~,
AOGCC Inspector: Lou Grimaldi (waived) Other Observers:
inspection Date: 7!18/2010 AOGCC Notice Dafe:
Time of arrival: 12:00 PM Time of Departure:
Site access method: Truck
No
Jack Winslow
7/1 6120 1 0
12:15 PM
TRH = 4-1 /1 fi' SM CIW
WELLHEAD= 5M FMC
ACTUATOR= BAKER
KB. ELEV = 80.9'
BF. ELEV = 27.22'
KOP= 2100'
MaxA le= 97 11861'
Datum MD = 10663'
0.9tum ND= 8800' SS
10-3/4" CSG, 45.5#, Nf-80, ID = 9.950" ~--I 3380'
Mirlmum ID = FISH @ 9315'
2-3/8" CH EM CUT COIL TBG
* TOP OF 2-3/8" COIL TBG FISH, 4.45#, H-90 9315' +/-
GUIDE TOOL SET ON COL 4-1 /2 GFN (WLM) 9327'
SAFETY NOTES: DURINGY37ASDTRKOPS,+/-
2135' OF 23/8" COIL TBG / BHA WAS LEFT IN
WELL AFTER COIL PARTED. TOP OF FlSH ~ 9315'
(CHEM CUT). BTM OF FISH ~ 11450'. " SEE CTD
R~ORTS FORADDITIONALINFO.
7-5/8" X 5-112' BKR PKR/HGR W/ TIEBACK H 10491'
7-518" CSG, 29.7#, NT-95HS, ID= 6.875" 10659'
7-5/8^ CSG SHOE 10630'elm
TOPOFWHIPSTOCK 10650'
RA PIPTAG 10659'
PERFORATION SUVIM4RY
REF LOG:
ANGLE AT TOP PERF:
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL OprYSoz DATE
R3TD F-I 10976'
I 5-1/2" LNR 17#, 13-CR, ID=4.892" I
Y 3 7 A S'~ NOTES: 4-112" TBG 8 5-1/2" LNR ARE
~ 13~HROME WELL ANGLE> 70° ~ 10780' & >
90° ~ 10865'.' COIL TBG RSH IN HOLE
9315'.SEESAFETYBOXBELOW FORDETAILS.
209$' 4-1 /2" OTIS SSSV NP, ID = 3.813"
r~ c ~ icr inn nn~ c
~~
ST MD ND DEV TYPE VLV LATCH PDRT DATE
7 3222 3034 37 KBMG DV BK 0 02/28/02
6 5768 4952 44 KBMG DV BK 0 02/28/02
5 7685 6330 43 KBMG C1V BK 0 02/28/02
4 9042 7373 38 KBMG CN BK 0 02/28102
3 10056 8227 24 KBMG DV BK 0 02/28/02
2 10201 8360 21 KBMG DV BK 0 02/28/02
1 10306 8459 19 KBMG DV BK 0 02/28/02
10373' H4-1 /7' PARKER SWS NP, D = 3.813"
10428' -{7-5/8"X4-1C2" BKRSABL-3 RCR, ID= 3.93T' I
10459' 4-1 /2" PARKER SWS NP, D = 3.813"
10477' 4-1 /2" SWN NIP, MILL'DT03.80" D
10492' 4-1 /2" TBG, 12.611, 13-CR, .0152 bpf, ID = 3.958"
10493' H4-1/2" WLEG, ID= 3.958"
10463' ~MD TT LOGGED 11 /10/93
5-1/2" LNR MLLOUT WINDOW (Y-37A)
10651' - 10658' (OFF WHPSTOCK )
DOTE REV BY COMMENTS DATE REV BY COMMENTS
10/31/93 MDO ORIGINALCOMPLETDN
03/31x02 CTDSDETRACK(ATTEMPT)
04/02/02 CH/TP CORR~TiONS
06/24/02 JM'KAK SETGUDETOOL
I BTM OF CT FISH I
3-3/4" OPEN HOLETD H 1
PRUDHDEBAY UVff
WELL: Y-37A
PERMIT ND: 202-0460
AR No: 50-029-22403-01
SEC 33, T11 N, R13E 1425' SNL & 276' WEL
BP Exploration (Alaska)
•
~~
,~
Z
0
cn
Entry.+Exd ~--~-~-
I ~;
r
~L_
~~~
~' .'
~)
it .
i .:__-_~
_ r vv
i
~~
~ti~---
i
~m w ~~
,y
7~
.~
-~ ~'
- =i ~ 3` -T > ~ c~
~ _ .~,_ _ s ~. ~_.
- _ __ _ _.
L _. ._-_
_- _, 69 ~ 1 ~..! [~ f ~ i i ~ ~ ~ L, ,~ __
1 P ~ ~ ~ ! I '
~ i ri i ~ ,
III; ~ ~ ~ ~ ~
1 ~ ~ ~,
'~ rr•r•NN1 i•~~~,•~~jr~~~ii--rr~r i ~ rrkr.;^ r~
J (J 17 ~'NN c)-' (.~A>C7 U`N ~~ iNJp~ A~~tJN CTS (W.f 'U+ ~ A ~ W ~ N i v
y u
_.__.,._
;~: ' .~ ~-
. ,_, _<
7135' 109' ~ 767'
I' iExR~Ertry
J)
~?=~ "" ~ * ~ PRUDHOE BAY UNtT - Y PAD
}~
!y1a96 Cy^n
t4< - ~~ •
~. f
''i
,.. ; .
~~~, n
sa ;~.t
'`~ M ~„ , ~'~ p ~~. ~h•xl ,°~ ~ t acv - °"~'} $ ~ t fv
r i ~.i
l ` [ i
..-r ~ ~p`~,~ ,n p ~ ^~ ~ ~2
,+, r' x : a
,~ J w ~, ,.
~~ ~
~~ ~ ~ ~ ~
~b.~ .. ~ .., }. ,~„.. ~ ~ ~ s~~ _.r ~ ~~
.A ~ u3.t~ .A =1 '
~' Pad
July 14, 2009
Approximate Scale: 1"=300'
2009-19c-8-22
AFRO-tli~TRI~
~ ~
. .*~ 6
! --:k'
.w1 M'
~ M~ _ , `.
r°
~.,~-"x a
4~,
y~• ~
#(~T`.U~K
5 'y ~ps~
~
t
~„ ~
~Y
~w~
-
44-. '.~
l
N
~I LLtt ~
.~-M`;~c k~ .. ~
~ 5
~
~ ~~
w
~
t
~~ ~
~`
= ~3
~
" ~ „
~~
e
4 ~~
+ ~'~
as
a ~ t d`
d ~ ~
* r rp
~- ~'. ~ -,
~~
~~ '~ I I._
~....
A .~
~. .v.
n..
a'°._
~ }
1
t-
. - ~ ~.
_ ~ _
.,.
~ f ~ ~,u
1
~ ~~ Y ~
4 a`
_ r?.
k
,.
~~~~
~
~~'~`
~. .. ~
• •
WELL NAME
Y1
A
OWNER Prudhoe Bay Unit
OPERATOR BP Exploration {Alaska) Inc,
API NUMBER 50-029-22403-01-00
SUR. LOCATION
DRILLING PERMIT
NE 1/4, Sec, 33, i'11 N, R13E
202-046
•
R.
i
•
e
e
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _ Insens\Microfilm _ Marker.doc
3 ö It ¡1 ÅOt)~t
DATA SUBMITTAL COMPLIANCE REPORT
4/2/2004
5>p '-LJ
) 611//vL À 6 l.j 2--
Permit to Drill 2020460
Well Name/No. PRUDHOE BAY UNIT Y-37A
Operator BP EXPLORATION (ALASKA) INC
API No. 50-029-22403-01-00
MD 12225../ TVD 8979 ./,-
Completion Date 3/31/2002 ---
Completion Status SUSP
Current Status SUSP
UIC N
- -------- ~-----
" ---- ___0----- --------
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey Yes-------
---------
-----------
DATA INFORMATION
Types Electric or Other Logs Run:
Well Log Information:
(data taken from Logs Portion of Master Well Data Maint)
Log/ Electr
Data Digital Dataset
Type Med/Frmt Number
~kOg------ -~---
~g
~C
~C
I
0-°g
JJ,.og
Name
I nduction/Resisti\lity
Gamma.Ray
10918 GammaRaY
10917 Induction/Rêsisti\lity
Gamma . Ray
Induction/ResistivitY
Log Log Run Interval OHI ---
Scale Media No Start Stop CH Received Comments
25 BS 1-5 rþi"D 10642 12197 Open 4/19/2002
25 BS 1-2 r-CJI) 10642 10867 &If:ê- 4/19/2002 PB1
10652 1 0897 ~4/19/2002 PB1
Name
Interval
Start Stop
5 10652 12225 Open 4/19/2002
25 BS 1-2 M ß 10642 10867 8C- 4/19/2002 PB1
25 BS 1-5 M /) 10642 12197 Open 4/19/2002
Sample
Set
Sent Received Number Comments
- ----------
Well Cores/Samples Information:
Well Cored?
ADDITIONAL INFORMATION
Y/~
Daily History Received?
'"'
ON
(jyN
------'
Chips Received? ,- Y I N -
Formation Tops
Analysis
Received?
~
------
- ------- -- ----- -
Comments:
---- ------
J-cu
Date:
') 6 flrr J-M v\
------------
Compliance Reviewed By:
¿ý'
\
) STATE OF ALASKA ')
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well
D Oil 0 Gas 181 Suspended D Abandoned D Service ..
2. Name of Op~rator t;'.~:~;:~~: ':::;~;:~';\'t $urLÿo..~/~ 7. Permit Number
BP Exploration (Alaska) Inc.' JATH.~; 202-046 302-385 <-
3. Address ~_.3.-~..~~;, 8. API Number
P.O. Box 196612, Anchorage, Alaska 99519-661~. \n:.p~.n;~,t.:,', 50-029-22403-01
4. Location of well at surface '1,:::,:::æ1"';~~~::: 9. Unit or Lease Name
1425' SNL, 276' WEL, SEC. 33, T11 N, R13E, UM X = 644541, Y = 5948825 Prudhoe Bay Unit
At top of productive interval
839' SNL, 1992' EWL, SEC. 03, T10N, R13E, UM X = 646909, Y = 5944177 10. Well Number
At total depth
1339' SNL, 3279' EWL, SEC. 03, T10N, R13E, UM X = 648206, Y = 5943702
11. Field and Pool
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field / Prudhoe Bay Pool
KBE = 79.10' ADL 047471
12. Date Spudded 13. Date T.D. Reached 14. Date Camp., Susp., or Aband.
3/16/2002 3/24/2002 3/31/2002
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
12225 8979 FT 9651 7951 Fr 181 Yes D No
22. Type Electric or Other Logs Run
Vision-RES MD, Slim Pulse
23.
CASING
SIZE
20"
10-3/4"
7-5/8"
5-1/2"
Classification of Service Well
Y-37A
15. Water depth, if offshore 16. No. of Completions
N/A MSL Zero
20. Depth where SSSV set 21. Thickness of Permafrost
(Nipple) 2098' MD 1900' (Approx.)
WT. PER FT.
91.5#
45.5#
29.7#
17#
GRADE
H-40
NT80LHE
NT95HS
13Cr80
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH HOLE
Top BOTTOM SIZE
30' 110' 30"
30' 3372' 13-1/2"
27' 10659' 9-7/8"
10491' 10651' 6-3/4"
CEMENTING RECORD
270 sx Arctic Set (Approx.)
1281 sx CS III, 375 sx Class 'G'
265 sx Class 'G'
89 sx Class 'G'
AMOUNT PULLED
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
3-3/4" Uncased Hole (w/ Cementing Assembly Fish)
MD TVD MD TVD
10651' 12225' 8667' 8079'
'N~.\\~1".)t".iL.._~\S ~\<..;)~~d ;~ I <..~,\ \-~~\\{~
<"'(i.,;¡~ ~ tj~\- \"\<) 1/",,- \ \ l-.\ S \:) \,."\ Q.. '-\... \\.... ~,..;:¡~
'-\-""-(l- ~"'\I~~ <: \ a <O'-{b'., ß V 0.. \-\~'(¡"I\~ \~()
+e Ç\c~1 {\~\~~\\.. \').;)lc ~~~~~~.. I-iR. \~~~-_.
~:\ "~~~)~h.,~<:?t '\S {~~y~~'\(.;~, MJ' {VI
27. ql..">--û, PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
Not on Production N/A
Date of Test Hours Tested PRODUCTION FOR OIL-BBL
TEST PERIOD
25.
SIZE
4-1/2", 12.6#, 13Cr
TUBING RECORD
DEPTH SET (MD)
10493'
PACKER SET (MD)
10428'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
9315' - 11450' Coil Tubing Cementing Assembly Left in Hole
9651' PBTD, Milled out inside of 2-3/8" Coil
Tubing Cementing Assembly (06/29/02)
Freeze Protect with 35 Bbls of MeOH
GAs-McF
WATER-BBL
CHOKE SIZE
GAS-OIL RATIO
Flow Tubing Casing Pressure CALCULATED
Press. 24-HoUR RATE
OIL-BBL
GAs-McF
WATER-BBL
OIL GRAVITY-API (CORR)
28.
CORE DATA ,,,,,= " I'
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core Çbi~:
No core samples were taken.
2\~aS~Œ
.... ¿; \~
Form 10-407 Rev. 07-01-80
RBDMS BFL
APR
2 'Jiln'J
L\...:I.....h)
~r
Submit In Duplicate
, ,
)
)
29.
Geologic Markers
30.
Formation Tests
Marker Name
Measured
Depth
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered and
gravity, GOR, and time of each phase.
Shublik B
10698'
8909'
Shublik C
10720'
8925'
Sadlerochit
10753'
8945'
31. List of Attachments:
Summary of Daily Drilling Reports, Surveys
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed T."ieHUbbl.~..~ Title Technical Assistant Date Oé)..'~4'03
Y -37 A 202-046 302-385 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. / Approval No. Drilling Engineer: Alistair Sherwood, 564-4378
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
~roducing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 1 0-407 Rev. 07-01-80
~)
)
BP EXPLORATION
O>perationsSummary Report
Page 1 df 14
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Y-37
Y -37 A
REENTER+COMPLETE
NABORS
NABORS 3S
Start: 3/12/2002
Rig Release: 3/31/2002
Rig Number:
Spud Date: 3/13/2002
End: 3/31/2002
Date From - To Hours Activity Code NPT Phase Description of Operations
3/12/2002 00:00 - 13:00 13.00 RIGU P PRE Turn key move to Y-37a
13:00 - 00:00 11.00 RIGU N WAIT PRE Wait on site prep, Installation TWC,well house removal,and
pad leveling.
3/13/2002 00:00 - 13:00 13.00 RIGU N WAIT PRE Wait on gravel; grade and level location.
13:00 - 15:00 2.00 RIGU P PRE Position rig over well. Required pulling off and releveling.
15:00 - 20:30 5.50 RIGU P PRE Spot pits, raise derrick, RU piperack, floor, wires, lines, steps,
handrails, etc. Spot OS #4.
20:30 - 00:00 3.50 RIGU P PRE Accept rig 20:30 hrs. NU BOPE. Function rams.
3/14/2002 00:00 - 00:30 0.50 RIGU P PRE Finish NU BOPE.
00:30 - 03:00 2.50 BOPSUR P DECOMP Grease valves and RU for BOP test.
03:00 - 09:00 6.00 BOPSUR P DECOMP Test BOPE. Witness waived by AOGCC's Jeff Jones.
09:00 - 10:00 1.00 BOPSUR N RREP DECOMP Rebuild choke manifold valve.
10:00 - 10:30 0.50 BOPSUR P DECOMP Finish BOP test.
10:30 - 11 :30 1.00 BOPSUR P DECOMP RU BPV lubricator. Pull TWC. Well on vac.
11 :30 - 12:00 0.50 KILL P DECOMP Safety meeting.
12:00 - 12:45 0.75 KILL P DECOMP Load well with SW 4.0 BPM; 300 psi.
12:45 - 13:15 0.50 KILL N SFAL DECOMP Failure of DS pump on gear end. Housing ruptured. All gear
oil caught in secondary containment.
13:15 - 14:00 0.75 KILL P DECOMP Continue BH kill. Final injectivity 4.0 BPM; 280 psi WHP.
14:00 - 15:15 1.25 PXA P DECOMP PU inj. MU cementing BHA.
15:15 -16:45 1.50 PXA P DECOMP PT MHA. Displace methanol from coil. Stab inj.
16:45 -19:15 2.50 PXA P DECOMP RIH circulating 0.5 BPM, no returns.
19:15 - 19:45 0.50 PXA P DECOMP Tag whipstock 10688' CTM. Correct depth (-36'). Repeat tag.
Pull back into tubing tail. No overpulls, but high string wt (55k
up at 40 FPM).
19:45 - 20:15 0.50 PXA P DECOMP Safety meeting with cementers.
20:15 - 21 :30 1.25 PXA P DECOMP RU cementers. Take on additional fluid form uprights to flood
backside to keep hole full.
21 :30 - 22:00 0.50 PXA P DECOMP Pump across top to fill hole.
22:00 - 22:06 0.10 PXA P DECOMP Pressure test lines to 4000 psi.
22:06 - 22:23 0.28 PXA P DECOMP Mix and pump bentonite cement. 5bbl cement neat,15bbl
cement with aggregrate, 5 bbl cement neat. Displace to coil at
2.2 bpm 1060 psi. Shut in choke.
22:23 - 22:33 0.17 PXA P DECOMP Bull head cement to Perforations at 2.6 BPM 970 psi CTP.
WHP 135 psi. Locked up when lead cement hit perforations.
Let WHP build to about 700 psi.
22:33 - 23:02 0.48 PXA P DECOMP Open to FOC and lay in cement one for one. Top of cement
estimated 9300. POOH to 9000'. Squeeze to 1200 psi. Perfs
did not take much more (0.5 bbl max).
23:02 - 23:50 0.80 PXA P DECOMP RIH circulating 1.7 ppb biozan at FOC. Contaminating the
cement circulating 2 bbl for each bbl of cement. RIH to 10640'
23:50 - 00:00 0.17 PXA P DECOMP POH
3/15/2002 00:00 - 03:00 3.00 PXA P DECOMP POH lay down cementing nozzel. Jet BOP.
03:00 - 04:00 1.00 STWHIP P WEXIT MU Milling assembly.
04:00 - 06:45 2.75 STWHIP P WEXIT RIH with milling assembly BHA#2
06:45 - 08:00 1.25 STWHIP P WEXIT Tag XN 10477' CTM. Correct depth (-30') to 10447' ELMO.
Mill XN and dress
08:00 - 08:45 0.75 STWHIP P WEXIT RIH. MW starting 10646'. Mill cement to 10651'. Stall here.
No overpull. Ease into it again. Stall 10651'. Must be our
pinch point.
08:45 - 11 :00 2.25 STWHIP P WEXIT Mill window. Slow getting started, grabby with several stalls at
10651'. Time drill first 0.5' at 2.6 BPM; 2100 psi FS. Full
returns.
Printed: 4/1/2002 11:16:19 AM
)-
')
SF> EXPLORATION
OpërationsSummary R~port
Page 2of.14
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Y-37
Y-37A
REENTER+COMPLETE
NABORS
NABORS 3S
Start: 3/12/2002
Rig Release: 3/31/2002
Rig Number:
Spud Date: 3/13/2002
End: 3/31/2002
{)ate From - To Hours Acti"ity Code NPT Phase DescriptioJiof Operations
3/15/2002 11 :00 - 18:00 7.00 STWHIP P WEXIT Start pushing on it a little. Mill to 10653' with about 2000 #
WOB, pumping Flo-Vis sweeps. Progress slowed. Stacking
up to 6000 WOB wlo much motor work. Strange milling:
stacking with 500 psi CTP above FS, then release brake, got
wt back. Continue to crawl. Stall at 11657.4'. Acts like
bottom of window.
18:00 - 20:55 2.92 STWHIP P WEXIT Continue to mill 1 0658.3 Stalled twice Acts like string at base
of window. Continue milling. Mill from 10,659' to 10661 at an
average rate of 7 ftlhr @ 2600 psi at 2.6 bpm FS = 1950 psi.
20:55 - 22:10 1.25 STWHIP P WEXIT Stopped making progress at 10661.5. Picked up and made
numerous attempt to mill NO progess. Decided to POH and
look at mill.
22:10 - 23:15 1.08 STWHIP P WEXIT Take on mud and circulate mud to mill.
23: 15 - 00:00 0.75 STWHIP N DPRB WEXIT POH laying in new mud.
3/16/2002 00:00 - 01 :05 1.08 STWHIP N DPRB WEXIT POH to inspect milling assembly.
01 :05 - 02:00 0.92 STWHIP N DPRB WEXIT Diamond mill under gauge at 3.56". String mill in gauge.
Replaced one missing set screw in the coil connector. MU
parabolic diamond mill and string mill.
02:00 - 03:55 1.92 STWHIP N DPRB WEXIT RIH to 10650
03:55 - 05:48 1.88 STWHIP P WEXIT Stalled once at 10,657.5. Ream to botttom 10661.5. Drill
formation at 2.6 bpm 3000 psi F.S. = 2700 psi. drill to 10670.
Window 10651 to 10657.5. Back ream at 2.4 ftlmin 2.6 bpm @
2700 psi to 10, 644. RIH dry and tag. PU clean. PU to 10640
make second dry tag. Clean both ways.
05:48 - 07:30 1.70 STWHIP P WEXIT POOH.
07:30 - 08:00 0.50 STWHIP P WEXIT LD milling BHA.
08:00 - 09:45 1.75 DRILL P PROD1 MU drilling BHA: M09, 3.28 deg BHI motor, Anadril MWD,
Weatherford 36 deg orienter. Test orienter. Tough getting
motor stuffed into tubing.
09:45 - 12:00 2.25 DRILL P PROD1 RIH. Shallow test good. Did not check orienter again. Correct
depth at flag (-38'). Continue RIH. Wt bobble but fell thru
10656'. Tag TD 10667'.
12:00 - 12:15 0.25 DRILL P PROD1 PUH above window and orient high left. Looks like we're
getting 1:1 on orienter.
12:15 - 14:30 2.25 DRILL P PROD1 Drill 2.3/2600 with TF wandering between 20L and 15R. Full
returns. Drill to 10711'.
14:30 - 15:30 1.00 DRILL P PROD1 Orient to keep us a little more on the left side. Tough getting
clicks in OH with high bend motor. PUH to casing and get
them there.
15:30 -18:15 2.75 DRILL P PROD1 Drill 2.5/2800. Gettin' 50 deg DLs -- lookin' good. Typical 1 0 -
20 FPH Shublik drilling; push any harder and it stalls. Drill to
10734'.
18:15 - 22:30 4.25 DRILL P PROD1 Pump up survey. Directionally drill to 10,810' 2.7/2.7 bpm
3280 psi.(F.S.=3090 psi)
22:30 - 22:50 0.33 DRILL N DPRB PROD1 Suffiently away from old well bore to get good Azimuth. Need
80 L. Attempt to orient 1111111 no responce.
22:50 - 00:00 1.17 DRILL N DPRB PROD1 Attempt to orient 1111 no responce. PU into casing. Tool face
changed 180R pulling into casing. Orient Try 3 clicks got 4, try
3 got 1, try 2 got 2.
3/17/2002 00:00 - 02:50 2.83 DRILL N DPRB PROD1 RIH to bottom. Unable to get toolface change. PU try for 5
clicks got 3. Try for additional 5 clicks get 4. Continue
attempting to orient. Unable to orient on bottom. Regardless
of the toolface set in cased hole the toolface returns to the
Printed: 4/1/2002 11: 16: 19 AM
')
)
BP EXPLORATION
0 perationsSu m märy. Report
Page 3 of 14
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Y-37
Y-37A
REENTER+COMPLETE
NABORS
NABORS 3S
Start: 3/12/2002
Rig Release: 3/31/2002
Rig Number:
Spud Date: 3/13/2002
End: 3/31/2002
Date FroÏ11- To Hours Activity Code NPT Phase. Description of Operations
3/17/2002 00:00 - 02:50 2.83 DRILL N DPRB PROD1 bottom hole toolface. Back ream bottom the length of the
BHA. No effect on ability to orient. A combination of the high
bend motor and the competency of the formation in the top of
zone 4 are preventing acquisition of the required tool face. Last
survey incicated 20/1 OODL required. Decided to POH.
02:50 - 05:30 2.67 DRILL N DPRB PROD1 POH for BHA change.
05:30 - 07:30 2.00 DRILL N DPRB PROD1 Swap motor to 1.83, swap bit to DS49 (M09 had boogered
cutters on gage), swap MWD to recover memory data, swap
orienter to another new style, test orienter.
07:30 - 09:45 2.25 DRILL N DPRB PROD1 RIH. Correct depth at flag (-46').
09:45 - 10:15 0.50 DRILL N DPRB PROD1 Log tie-in at 10500'. GR not working -- pegged out. We'll finish
our build anyway.
10:15-10:30 0.25 DRILL N DPRB PROD1 RIH at 90R TF clean thru window. TF shifted to highside (as
expected) towards bottom. Tag TD 10821'.
10:30 - 11 :30 1.00 DRILL N DPRB PROD1 Orient TF. Can't get clicks on bottom -- staying high side.
Also, keep stalling on bottom, losing a couple feet each time.
Pull into casing and get some clicks. GR started working
again.
11 :30 - 12:45 1.25 DRILL N DPRB PROD1 Finally got 90L TF on bottom, but can't drill. Stalls too easy on
bottom 10816'. Ease into it at 0.1 FPM, still stalls. Good slide
to bottom, so it's not stalling because of stacking then slipping
all at once. Worked back to 10821'. Stall. PUH, RIH, stall
10815'. Hope we haven't found our missing GLV. RIH stall at
10820'. All PU's are with about 3k - 4k overpull. Approach
grabby spot even slower -- got by it (that may not be a good
thing).
12:45 - 15:00 2.25 DRILL P PROD1 Drill with 90L TF to 10850'. Surveys showing we need some
more inclination. Get a couple clicks. Drill to 10897'.
Stacking.
15:00 - 15:30 0.50 DRILL P PROD1 Wiper to window. Struggle getting up past 10821' stinker.
Repeated overpulls, w/o MW. Stack wt down to get free.
Worked up past tight spot. Continue wiper to window. RIH.
Set down and stall 10824'.
15:30 - 17:15 1.75 DRILL N DPRB PROD1 Try to work past 10824'. PUH to orient left. RIH and stall
10770' (shale here, but doubt that's what is getting us).
Repeat, stall again. Check TF 140R. Orient to 90L. RIH,
P-spike 10768' then stall 10770'. PUH. RIH dry, clean past
10770'. Set down 10790'. Bring pumps up, stall. PUH. RIH
dry again. Set down but fell thru 10800'. Tag 10820', PUH,
RIH clean to tag at 10820'. PUH and try to get TF from 145L to
90L. Would not take clicks. Stall at 10820' with 140L TF. All
pickups are with just slight overpulls. Orient to 90L. Got the
clicks but still can't get past 10820'. Need to do something
different -- putting a lot of fatigue on the pipe.
17:15 -17:45 0.50 DRILL N DPRB PROD1 PUH to try and get a tie-in at 10500' before POOH (we have
not done any tie-in yet). GR pegged out at 125 counts --
should be around 50. Above and below it's believable. Maybe
scaled-up in tailpipe area. Flag pipe w/o tie-in correction.
17:45 - 18:00 0.25 DRILL N DPRB PROD1 POOH.
18:00 - 18:15 0.25 DRILL N DPRB PROD1 PJSM crew change
18:15 - 19:20 1.08 DRILL N DPRB PROD1 Continue POH to surface.
19:20 - 19:38 0.30 DRILL N DPRB PROD1 PJSM change out BHA.
19:38 - 20:15 0.62 DRILL N DPRB PROD1 Change out packoff on injector. Tighten coil connector 3
Printed: 4f1l2002 11: 16: 19 AM
, ,
J
)
BPEXPLORATION
Operáti()ns, Surrïmary>Røport
Page 4 of 14
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Y-37
Y-37A
REENTER+COMPLETE
NABORS
NABORS 3S
Start: 3/12/2002
Rig Release: 3/31/2002
Rig Number:
Spud Date: 3/13/2002
End: 3/31/2002
£Date From - To HoÜts Activity Code NPT Phase Description of Operations
3/17/2002 19:38 - 20:15 0.62 DRILL N DPRB PROD1 screws loose. Laydown out BHA
20:15 - 21 :25 1.17 DRILL N DPRB PROD1 PU venturi basket and motor to fish junk ( possible GLV).
21:25-23:10 1.75 DRILL N DPRB PROD1 RIH. Correct to flag -51'.
23:10 - 23:16 0.10 DRILL N DPRB PROD1 Establish baseline pressure. 3300 psi @ 2.5 bpm.
23:16 - 00:00 0.73 DRILL N DPRB PROD1 RIH without pump. Tag botttom of window. Picked up went
right thru. RIH to TD without pump (Like it had eyes). PU 10'
start pumping at 2.5 bpm 3415 psi. RIH to TD. POH to 10,860'
saw 10k over pull at 10,872'. RIH to TD saw motor work at
10,883. POH to 10,840 clean. RIH to TD. Decided to POH
circulating.
3/18/2002 00:00 - 01 :30 1.50 DRILL N DPRB PROD1 POH with venturi basket.
01 :30 - 02:00 0.50 DRILL N DPRB PROD1 Lay down BHA Venturi basked contains large chunks of rubber.
Enough large pieces to make a soft ball.
02:00 - 02:30 0.50 DRILL N DPRB PROD1 Review data and plan next trip. Will resume drilling. After
reviewing projected angle and direction of bit, decided a short
run with 1.83/100 motor is required to land the build.
02:30 - 04:00 1.50 DRILL N DPRB PROD1 PU building assembly.
04:00 - 06: 15 2.25 DRILL N DPRB PROD1 RIH. Correct depth at flag (-51').
06:15 - 07:30 1.25 DRILL N DPRB PROD1 Try tie-in at 10500'. GR pegged-out again (yes, this is a
different GR tool, so must be scaled up in this area). RIH thru
window. Log up starting at 10700'. Correct depth (+18').
07:30 - 08:15 0.75 DRILL N DPRB PROD1 RIH tag and stall 1 0838' (same spot as uncorrected 10820'
problem area yesterday). RIH slowly at 30L TF and got past.
RIH and tag, stall, tag, stall, starting 10880' to bottom 10897'.
08:15 - 08:30 0.25 DRILL N DPRB PROD1 Orient.
08:30 - 09: 15 0.75 DRILL N DPRB PROD1 Attempt drilling 2.5bpm I 2700 psi. Repeated stalls on bottom
10897' and within a few feet of bottom. Junk still present.
POOH for JB again.
09:15 -11:15 2.00 DRILL N DPRB PROD1 POOH.
11: 15 - 11 :45 0.50 DRILL N DPRB PROD1 LD BHA
11 :45 - 12:15 0.50 DRILL N DPRB PROD1 Safety meeting.
12:15-13:00 0.75 DRILL N DPRB PROD1 C/O annular packoff rubber. This is clearly the source of the
downhole recovered rubber.
13:00 - 13:45 0.75 DRILL N DPRB PROD1 Stab coil and P-test annular and lubricator. Jet top of master.
13:45-14:15 0.50 DRILL N DPRB PROD1 MU venturi JB.
14:15 - 16:15 2.00 DRILL N DPRB PROD1 RIH. Correct depth at flag @ 10300' (-32')
16:15 -17:15 1.00 DRILL N DPRB PROD1 RIH dry. Tag 10760' and fell thru. Tag TD 10909'. Bring up
pumps 2.5/3400. RIH slow. Hard stall 10907.5'. Wash back.
RIH stall again 10907.5' (shouldn't stall this easy on formation).
Ease into it very slow -- stall again. Jar down 3 times without
pumps. Dry tag now at 10911'. PUH, wash down very slow but
stalled at 10908'. Jar down again 3 times without pumps.
PUH, wash down and stall 10906.5'. Try it again. Stall 10908'.
17:15 -19:15 2.00 DRILL N DPRB PROD1 POOH washing slow in open hole 2.5 BPM.
19:15 -19:45 0.50 DRILL N DPRB PROD1 LD BHA. Venturi JB gone -- twisted off. LlH: mule shoe,
screen sub, extension, venturi JB, and our pride (7.9' total
length).
19:45 - 21 :00 1.25 DRILL N DPRB PROD1 Wait on aluminum open hole kick off plug.2140
21 :00 - 21:40 0.67 DRILL N DPRB PROD1 PU aluminum open hole whipstock and stab onto well.
21 :40 - 00:00 2.33 DRILL N DPRB PROD1 RIH correct to flag -38.2'.
3/19/2002 00:00 - 02:00 2.00 DRILL N DPRB PROD1 RIH and correct to flag at 10,300 (-32.8)'. Continue to RIH to
10,741 were we set down. PU and SO twice and set down at
Printed: 4/1/2002 11: 16: 19 AM
, ,
')
)
BP EXPLORATION
OperationsSunnnary:Repôrt
Pàge50f 14
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Y-37
Y -37 A
REENTER+COMPLETE
NABORS
NABORS 38
Start: 3/12/2002
Rig Release: 3/31/2002
Rig Number:
Spud Date: 3/13/2002
End: 3/31/2002
Date From-To Hours Activity Code NPT Phase Desëription of Operations
3/19/2002 00:00 - 02:00 2.00 DRILL N DPRB PROD1 10,735 and 10,723. Losing ground. Discussed with Dave Hearn
the tool limitations. Aggressively worked open hole whipstock
for 2 hours gradually working to setting depth (10,835 top of
whipstock). Approximately 35 up and down cycles were
required to get it to bottom.
02:00 - 02:38 0.63 DRILL N DPRB PROD1 Drop .5" ball and circulate to running tool. Pressure to 2200 psi
to set and 4200 psi to shear tool. Stack 7000# on the
whipstock OK.
02:38 - 04:15 1.62 DRILL N DPRB PROD1 POH with setting tool.
04:15 - 04:38 0.38 DRILL N DPRB PROD1 PJSM change out running tool for drilling BHA.
04:38 - 05:00 0.37 DRILL N DPRB PROD1 LD setting tool.
05:00 - 05:45 0.75 DRILL N DPRB PROD1 MU drilling BHA with 2.38 motor.
05:45 - 06:00 0.25 DRILL N DPRB PROD1 RIH to 1000' and shallow hole test MWD OK.
06:00 - 07:45 1.75 DRILL N DPRB PROD1 RIH. Correct depth at flag (-38')
07:45 - 08:30 0.75 DRILL N DPRB PROD1 Log tie-in up starting at 10700'. Correct depth (+4')
08:30 - 10:20 1.83 DRILL N DPRB PROD1 RIH tag dry at 10840' corrected. PUH and orient to high left.
Struggle getting clicks.
10:20 - 10:50 0.50 DRILL N DPRB PROD1 After nearly two hours of getting clicks, ended up 15R. RIH
with pumps and tag/stall 1 0834'. Start time milling sequence
here. Milled to 10835' but TF shifted to 25R -- unacceptable.
PUH and orient again shooting for high left.
10:50 - 13:15 2.42 DRILL N DPRB PROD1 RIH. Tag and stall 10836.5'. Time drill 2.6/2950 at 6 FPH with
TF 5L. Several stalls to 10837.7'. Slow down the time drill to 2
FPH. TF gradually moved to 1 OR. Time drill to 10838.5', then
start pushing on it. No stalls, looks like we're off.
13:15 - 14:00 0.75 DRILL N DPRB PROD1 Drill 40 FPH, 5R TF to 10865'.
14:00 -15:00 1.00 DRILL N DPRB PROD1 Orient around to get a little turn. RIH at 58L and tag/stall
10838'. PU. RIH. Stall here again.
15:00 - 16:15 1.25 DRILL N DPRB PROD1 Orient. RIH at 45L. Tag/stall 1 0837', 20k OP. Tag/stall
10835.5', no OP. Tag/stall 10834.7', no OP. Tag/stall
10834.5', 20k OP.
16:15 -17:15 1.00 DRILL N DPRB PROD1 Ease into it with a little time milling to try and get top of
whipstock area cleaned up. Start at 10834.7' at 5L. By
10836.3', at 20L. Then TF shifted fairly quickly to 2L by
10836.6'. No further TF change or MW after this depth, but
continue time milling to 10838.5'. Then let it fall -- clean to TD
10863'.
17:15 -17:30 0.25 DRILL N DPRB PROD1 Drill to 10870' with reactive taking us to 30L.
17:30 - 20:00 2.50 DRILL N DPRB PROD1 Pump up survey. Ream junction 2.6/3000 20R at 0.2 FPM.
RIH with pumps: pressure bump and wt loss at 10840' but fell
thru. Back ream again. RIH clean with and without pumps.
20:00 - 22:30 2.50 DRILL N DPRB PROD1 POOH
22:30 - 23:30 1.00 DRILL N DPRB PROD1 C/O motor to 1.5 deg.
23:30 - 00:00 0.50 DRILL N DPRB PROD1 RIH
3/20/2002 00:00 - 02:30 2.50 DRILL N DPRB PROD1 RIH with BHA #11 (1.5 deg motor).
02:30 - 03:45 1.25 DRILL N DPRB PROD1 Log tie-in at window. Correct depth (+28').
03:45 - 04:30 0.75 DRILL N SFAL PROD1 Replace hard-line seal in reel house.
04:30 - 05:30 1.00 DRILL N DPRB PROD1 RIH and tag 10921'. Repeat tag twice at 10900'. PUH.
05:30 - 07:00 1.50 DRILL N HMAN PROD1 Tie-in again at window. Correct depth (-59'). RIH 140R and
tag 1 0840'.
07:00 - 07:30 0.50 DRILL N DPRB PROD1 Orient high side. RIH 5L and tag 10840'. Will need to mill at
junction again.
07:30 - 09:00 1.50 DRILL N DPRB PROD1 Orient around. Start time drill, stall 10839.5', TF at 20L, ease
Printed: 4/1/2002 11:16:19AM
~
'.,
- -)
,)
BPEXPLORATION
Operations..Summary Ré,po.rt
Pagø 6 of14
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Y-37
Y -37 A
REENTER+COMPLETE
NABORS
NABORS 3S
Start: 3/12/2002
Rig Release: 3/31/2002
Rig Number:
Spud Date: 3/13/2002
End: 3/31/2002
Date From - To Hours Acti\JityCode NPT Phase DescÍ"iption of Operations
3/20/2002 07:30 - 09:00 1.50 DRILL N DPRB PROD1 into it again, no stall, time drill a couple of feet w/o MW, RIH
clean to TD 10876'.
09:00 - 09:30 0.50 DRILL N DPRB PROD1 Orient for left turn.
09:30 - 10:00 0.50 DRILL N DPRB PROD1 Drill to 10900'
10:00 - 13:30 3.50 DRILL P PROD1 Back on productive time. Drill to 11050'.
13:30 - 14:00 0.50 DRILL P PROD1 Wiper to window. 90L TF jumped highside in junction. Clean
up through junction, slight wt and pressure bobble RIH thru
junction.
14:00 - 14:30 0.50 DRILL P PROD1 Orient.
14:30 - 16:00 1.50 DRILL P PROD1 Drill to 11125',
16:00 - 18:00 2.00 DRILL P PROD1 Orient and backream junction 90L -- jumped to 50L at 10840'
up. RIH and stall 10839' with this same TF. Get a click. RIH
clean. Orient. Ream up 120L, stall 1 0835' up (slow stall).
RIH. Ream up starting at 10837', TF shifted to 90L. MW
starting 10835.7' up. Lots of MW 10835.4' up, then milled off
by 10835.2'. Stall at 10834.9'. RIH. Ream up, start MW
10835', near stall 10834.1', broke over, strong MW 10833.7',
near stall, broke over. Start MW 10833.2'. Lost all MW by
10832'. PUH. RIH stall at 10834'. PUH, RiH dry clean. PUH,
RIH with pumps clean.
18:00 - 21 :30 3.50 DRILL P PROD1 POOH. Flag pipe 10300' EOP. OOH.
21 :30 - 22:30 1.00 DRILL P PROD1 LD BHA#11.
22:30 - 23:00 0.50 DRILL P PROD1 Set BPV
23:00 - 00:00 1.00 DRILL P PROD1 BOPE test.
3/21/2002 00:00 - 05:00 5.00 DRILL P PROD1 Continue w/BOPE test.
05:00 - 06:00 1.00 DRILL P PROD1 Retrieve BPV.
06:00 - 06:30 0.50 DRILL P PROD1 Safety meeting.
06:30 - 08:15 1.75 DRILL P PROD1 MU BHA #12: resistivity, 1.15 deg motor. Displace methanol
from coil and PT inner reel valve while MU BHA.
08:15 - 10:30 2.25 DRILL P PROD1 RIH. Correct depth at flag (-4').
10:30 -11:15 0.75 DRILL P PROD1 Log tie-in. Correct depth (+5')
11: 15 - 11 :30 0.25 DRILL P PROD1 RIH clean at minimum pump. Tag TO @11121'.
11 :30 - 12:30 1.00 DRILL P PROD1 Orienting left.
12:30 - 15:30 3.00 DRILL P PROD1 Drill to 11305'.
15:30 - 16:30 1.00 DRILL P PROD1 Wiper to the window. Smooth through junction.
16:30 - 17:00 0.50 DRILL P PROD1 Orient
17:00 - 18:00 1.00 DRILL P PROD1 Drill. Swap well to new mud (65K LSRV, 2 ppb Kla-gard, 1.5%
lubetex)
18:00 -19:15 1.25 DRILL P PROD1 Orient.
19:15 - 22:00 2,75 DRILL P PROD1 DriIl2.6/2810/90L. Hard spot @ 11409' - 11419'. Pull to 54K.
Go back to 80 ft/hr ROP. Drill to 11500'.
22:00 - 23:15 1.25 DRILL N STUC PROD1 Triying to get a survey. Got stuck while waiting on survey.
Work pipe out. Pump 34 bbls of lubetex pill. Pull up to 75K.
Got free when 12 bbls of pill out.
23:15 - 00:00 0.75 DRILL P PROD1 Wiper trip to the window. Clean trip.
3/22/2002 00:00 - 00: 15 0.25 DRILL P PROD1 Continue wlwiper.
00: 15 - 00:45 0.50 DRILL P PROD1 Orient.
00:45 - 03:00 2.25 DRILL P PROD1 Drill 2.6/2914/45R. ROP 80ft/hr. Drill to 11620'
03:00 - 04:00 1.00 DRILL P PROD1 Wiper trip to the window.
04:00 - 04:30 0.50 DRILL P PROD1 Orient.
04:30 - 04:50 0.33 DRILL P PROD1 Drill to 11635'.
04:50 - 05:15 0.42 DRILL P PROD1 Orient
05: 15 - 05:45 0.50 DRILL P PROD1 Drill to 10656'. Hit hard spot spot here. Multiple stalls.
Printed: 4/1/2002 11:16:19AM
. ,
,-
')
)
BÞ EXPLORATION
Oper~tiôns Summary Røport
Page 7 of 14
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Y-37
Y-37A
REENTER+COMPLETE
NABORS
NABORS 3S
Start: 3/12/2002
Rig Release: 3/31/2002
Rig Number:
Spud Date: 3/13/2002
End: 3/31/2002
Date From - To Hours Activity Code NPT Phase' Description..9fOpératibns
3/22/2002 05:45 - 06: 15 0.50 DRILL P PROD1 Stalls made us lose TF. Orient around.
06:15 - 07:00 0.75 DRILL P PROD1 Continue stalling at 10656'. Pump 10 bbllubetex pill to help
ease into it. Got thru hard spot before pill hit.
07:00 - 10:00 3.00 DRILL P PROD1 Drill slow with lots of stacking/stalling to 11690', then ROP
picked back up. Drill to 11720'. Stacking, BHA wiper, pump
another 10 bbls lubetex pill. Continue stacking/stalling.
10:00 - 10:20 0.33 DRILL P PROD1 Wiper trip up to 11170'.
10:20 - 12:15 1.92 DRILL P PROD1 Log resistivity MAD pass from 11170' to window at 300 FPH.
12:15 - 12:45 0.50 DRILL P PROD1 RIH. Clean. Slight MW in 11520' shale.
12:45 - 15:30 2.75 DRILL P PROD1 Drill. Generally, poor slide and easy stalls. In and out of shale
streak, drilling 50 API rock for at least 50 feet.. Drill to 11762'.
Note: This mud system started at 1.5% Lubetex. We have
since pumped pills containing a total of 2 drums Lubetex, which
has brought the system up to 2.2% Lubetex. Mix a another
drum of lubetex in a 30 bbl pill and pump all of it. We should
now have a system with 2.5% lubetex.
15:30-16:15 0.75 DRILL P PROD1 Drill. Getting what looks like stator rubber over the shakers.
Also, stalls becoming easier. Call it quits at 11776'.
16:15 -19:15 3.00 DRILL N DFAL PROD1 POOH for motor failure. EOP @9500'.
19:15 - 21:55 2.67 DRILL N DFAL PROD1 OOH. Change out motor and orienter. Bit and bleed sub OK.
Put 1.5 deg motor. Download resistivity. Cut 30' of pipe.
Surface test on orienter OK. Install new CTC.
21:55 - 22:15 0.33 DRILL N DFAL PROD1 RIH w/1.5 motor. SHT OK.
22:15 - 00:00 1.75 DRILL N DFAL PROD1 Continue RIH.
3/23/2002 00:00 - 00:30 0.50 DRILL N DFAL PROD1 Continue RIH.
00:30 - 02:10 1.67 DRILL N DFAL PROD1 Log tie-in. Correct depth (+26'). RIH tag TD 11801', which is
25' deeper than where we left bottom last night. Geo decided
not to make this +26' correction for now -- will take a closer
look at logs.
02: 1 0 - 03:00 0.83 DRILL N DFAL PROD1 Orienting.
03:00 - 04:45 1.75 DRILL P PROD1 Drill ahead. 2.6/3090/25R. Drill to 11,822'.
04:45 - 06:00 1.25 DRILL P PROD1 Orient. Struggle getting clicks.
06:00 - 07:30 1.50 DRILL P PROD1 Drill to 10840'. Trying to get about 120' TF. Getting as much
as 60 deg reactive, or orienter trouble -- keeps sending us back
to 90L. Continue taking a click at a time to get where we want.
Mucho off bottom time. Finally got several clicks and decided
that we neede to drill straight down anyway (97 deg).
07:30 - 09:15 1.75 DRILL P PROD1 Drill with 180 TF to 11940'.
09:15 - 09:50 0.58 DRILL P PROD1 Orient back around to level out.
09:50 - 10:10 0.33 DRILL P PROD1 Drill to 11960', stacking.
10:10 -10:50 0.67 DRILL P PROD1 Wiper to window. Pulling heavy with MW at 11565', pull heavy
wlo motor work 11545'.
10:50 - 11:40 0.83 DRILL N MiSe PROD1 Log tie-in at window. Correct depth (32').
11 :40 - 12:15 0.58 DRILL P PROD1 RIH. Tag TD 11988'.
12:15 - 12:45 0.50 DRILL P PROD1 PUH, check TF. Orient.
12:45 - 13:45 1.00 DRILL P PROD1 Drill. Hard, slow drilling 12010' - 12036'.
13:45 -15:15 1.50 DRILL P PROD1 Orient around. Drill a couple feet to 12038', two stalls, losses
started at 1.0 BPM. Lost TF. Orient around again.
15:15 - 16:10 0.92 DRILL P PROD1 Drill 2.7/1.0 at 90L TF. Returns improving to 2.7/1.7 within first
10'. ROP improved -- back to about 80 FPH, then hit hard spot
again at 12058'. Drill to 12070'. Stack negative weight, trying
to get a bite -- only slight motor work.
16:10 - 17:00 0.83 DRILL P PROD1 Orient one click, but can't get it. Finally got it. 50% of our time
Printed: 4/1/2002 11:16:19AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
'}
)
,BPEXPLORA TION
Operations SUrnrnaryR~port
Y-37
Y-37A
REENTER+COMPLETE
NABORS
NABORS 3S
PageS.of 14
Start: 3/12/2002
Rig Release: 3/31/2002
Rig Number:
Spud Date: 3/13/2002
End: 3/31/2002
Date
'From - To Hours Activity Code NPT Phase,
D:escription of Operations
3/23/2002
16:10 - 17:00
17:00 - 17:45
0.83 DRILL P
0.75 DRILL P
PROD1
PROD1
17:45 - 18:50 1.08 DRILL N DPRB PROD1
18:50 - 22:30 3.67 DRILL N DPRB PROD1
22:30 - 00:00 1.50 DRILL N DPRB PROD1
3/24/2002 00:00 - 01 :00 1.00 DRILL N DPRB PROD1
01 :00 - 03:45 2.75 DRILL N DPRB PROD1
03:45 - 04:15 0.50 DRILL N SFAL PROD1
04: 15 - 06:00 1.75 DRILL N DPRB PROD1
06:00 - 07:00 1.00 DRILL N DPRB PROD1
07:00 - 09:30 2.50 DRILL N DPRB PROD1
09:30 - 10:00
10:00 - 10:45
10:45 - 17:15
0.50 DRILL P
0.75 DRILL P
PROD1
PROD1
6.50 DRILL N
DPRB PROD1
on bottom today has been orienting.
Drill to 12075'. Lost all returns. 400 psi loss in CTP to 2800
psi; 7k gain in wt to 53k. Drill ahead 2.8/2800/75L TF, no
returns to 12090'. Still losing inclination. Need to get that TF
up.
Orient. Unable to orient. POH to change orienter.
POH
OOH. LD BHA #13. LD resistivity, motor and orienter. P/U
1.25 deg motor. Place bleed sub above orienter as per
Weatherford recommendation.
Making up new BHA. Test orienter on surface. OK.
RIH w/BHA #14. SHT. OK for MWD. Not getting clicks. At
tie-in depth. Got a click here.
Lost pump charge.
Log tie-in. Good MWD signal. Correct depth (+62').
RIH. Effects of lower BHP apparent -- sawall the shales with
either motor work or weight; had to get rough with some of
them to get through. Tag TD 12100'.
Check TF -- floating. Bad signal from MWD, but cleaned up.
TF at 90L. Need at least 2 or 3 clicks before we can drill
anything. Attempt to orient. 0 for 4. Try RIH quickly while
orienting. 0 for 2. SI reel valve with pump down to eliminate
continued suck thru charge pump. 0 for 2. Prep to pump down
the backside. Line-up Dowell pump on coil (hope it's not too
noisy for MWD signal). Line-up Nabors pump on backside.
Pump 3 BPM down backside and 2.6 BPM down coil.
Continue pumping down backside 3.0 BPM while trying to get
clicks. 0 for 2. Try to get a click by keeping Dowell pump
down for 5 minutes with reel isolated and cycling pipe back and
forth. Need about 3.5 BPM pumping down backside to keep
hole full. Looks like we finally got a click. Currently at 50L.
RIH and see where we're at on bottom.
Drill 2.6/2050 with 50L TF. ROP 150 FPH. Drill 12168'.
Continuous surveys bad. Pump up survey. Didn't get it. Try
again. Unfortunately, we got some clicks in the process, yet
we haven't been pumping down the backside. It's a 2-1/2 hour
struggle to get the clicks when we need them, but 10 minutes
to get them when we don't want them.
Orient wlo pumping down the backside. Nothing. Line-up
Nabors again on backside and fill 3.5 BPM. Line-up Dowell on
coil. Orient. Spending just as much time clicking as waiting for
confirmation of TF at surface -- poor signals, probably from
being on water vs mud. Trying to duplicate what worked for us
this morning. Finally got two clicks -- currently at 120R, only
180 deg to go -- looks like pumping down backside and
shutting in coil a minimum of 5 min between pump cycles is our
best shot at getting clicks. Continue orienting. Got to 120L,
but then next click shot us to high right (#?/!@%*!). PUH. Try
getting four clicks a couple hundred feet off bottom. RIH.
Difficult working back thru shales to bottom -- required
ramming speed. Check TF. Got 3 of 4 clicks. Don't know if
this was from shales knocking us around or successful clicks.
Work TF on bottom. Out of water for backside; try getting
Printed: 4/1/2002 11: 16: 19 AM
)
)
BP EXPLORATION
Operations....Sumtna.yRépórt ..
På~e 9 of 14
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Y-37
Y-37A
REENTER+COMPLETE
NABORS
NABORS 3S
Start: 3/12/2002
Rig Release: 3/31/2002
Rig Number:
Spud Date: 3/13/2002
End: 3/31/2002
Date From - Tò Hours Activity Code ,'NPT Phase Description of Operations
3/24/2002 10:45 - 17:15 6.50 DRILL N DPRB PROD1 clicks just using the 5-minute delay technique. Got a couple
clicks but not consistent.
17:15 - 18:00 0.75 DRILL N DPRB PROD1 Paragraph break. Pump 30 bbls of crude in coil. SD. Well is
not on a major suck thru coil with the crude in. Try orienting
"quickly" without 5 minute delay and without pumping down
backside. Got 1 :1. And got to where we want. Switch back to
Nabors pump down coil with Dowell pump still on so we don't
take a click.
18:00 - 18:30 0.50 DRILL P PROD1 Drill 140 FPH to 12205'. Drill to 12211'.
18:30 - 20:00 1.50 DRILL N DPRB PROD1 Orienting. Now we're have a tough time with crude in the coil.
Drill 90L to 12225'.
20:00 - 00:00 4.00 DRILL N DPRB PROD1 Wiper trip to window to check/work shales. Pulled heavy
gradually from 12110' (55k)- 12080' (70k). No motor work over
entire interval. BHA across fault zone(s). Work free down.
Keeps pulling heavy in fault zone. Limit pull to 65k and inch
pipe to 12075'. Still free in downward direction. Work pipe wlo
pumps, pumping down backside, crude down coil, crude down
backside. Work the way up to 12074. Pump down through
backside with both pumps. Continue working pipe.
3/25/2002 00:00 - 00:45 0.75 DRILL N DPRB PROD1 Working pipe circulating down coil, crude still on backside.
Cycle pipe quickly (50 FPM ish) and over greater length, pulling
up to 75K. Popped free, draggin a little for about 30' then clean
(65k).
00:45 - 02:00 1.25 DRILL N DPRB PROD1 POH to window. See some motor work @ 11710' & 11516'.
Continue pulling to the window.
02:00 - 04:00 2.00 DRILL N DPRB PROD1 RIH. Weight transfer problems @ 11920'. Work to 11946'.
Unable to go deeper. Pump through backside. Pump through
coil.
04:00 - 05:15 1.25 DRILL N DPRB PROD1 POH to window. Clean pick up. Work from 11946 to window
while waiting on mud pill.
05:15 - 07:00 1.75 DRILL N DPRB PROD1 Attempt to work past 11945'. Starting to see motor work here.
Load mud in coil. Seeing some returns -- crude. 51 backside,
finish loading coil with mud at 2.5 BPM (WHP leveled off at 220
psi).
07:00 - 08:15 1.25 DRILL N DPRB PROD1 Bullhead kill well down backside at 3.0 BPM; 800 psi initial
(recall yesterday, no pressure pumping down backside at 3.0
BPM). Lost pipe movement up. Moving free only in 11945' -
11930' window. SD bullhead kill on backside. Work pipe free.
Continue bullheading down backside. Pump 150 bbls, final
WHP = 300 psi. Check for flow. No flow. Est circ down coil.
2.5 BPM, no returns, so hole is not packed off below us.
08:15 - 09:15 1.00 DRILL N DPRB PROD1 Wiper to window and tie-in. Hole very clean PUH -- no tight
spots noted.
09:15 - 10:00 0.75 DRILL N DPRB PROD1 Log tie-in. Correct depth (+17').
10:00 - 10:45 0.75 DRILL N DPRB PROD1 RIH. "Saw" shales at 11548' and 11725' with a little motor work
but the hole is generally very clean. Tag 11954'.
10:45 - 12:15 1.50 DRILL N DPRB PROD1 PUH. Check TF. 65R. This is close to TF we drilled this
section at. RIH. Attempt to motor thru tight spot. Wt check
60k up; 14k down. From 11954', push negative weight to
12105'. Little to no MW, but PU at 12105' and stall. CTP
broke over but wt didn't, dragging heavy 5k to 15k over to
12000' with no motor work. Pull to 75k here, then broke back
to 60k. Pull clean to 11900'. RIH. Lost 5k at 12000'. RIH to
Printed: 4/1/2002 11: 16: 19 AM
.)
)
BPEXPLORATION
Opel7ations~ Summ:aryReport
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Y-37
Y-37A
REENTER+COMPLETE
NABORS
NABORS 3S
[Date From - To Höurs Activity Code NPT Phase
3/25/2002 10:45 - 12:15 1.50 DRILL N DPRB PROD1
12:15 -13:45 1.50 DRILL N DPRB PROD1
13:45 - 14:15
14:15 - 15:15
0.50 DRILL N
1.00 DRILL N
DPRB PROD1
DPRB PROD1
15:15 - 18:30 3.25 DRILL N DPRB PROD1
18:30-21:30 3.00 DRILL N DPRB PROD1
21 :30 - 23:30 2.00 DRILL N DPRB PROD1
23:30 - 00:00 0.50 DRILL N DPRB PROD1
3/26/2002 00:00 - 00:30 0.50 DRILL N DPRB PROD1
00:30 - 01:10 0.67 DRILL N DPRB PROD1
01:10-02:30 1.33 DRILL N DPRB PROD1
02:30 - 03: 15 0.75 DRILL N DPRB PROD1
03:15 - 04:20 1.08 DRILL N DPRB PROD1
04:20 - 06:00 1.67 DRILL N DPRB PROD1
06:00 - 06:45 0.75 DRILL N DPRB PROD1
06:45 - 08:45
2.00 DRILL N
DPRB PROD1
08:45 - 09:00
09:00 - 11 :00
DPRB PROD1
DPRB PROD1
0.25 DRILL N
2.00 DRILL N
Page to of14
Start: 3/12/2002
Rig Release: 3/31/2002
Rig Number:
Spud Date: 3/13/2002
End: 3/31/2002
Description ofOperàtions '
12030'. Check up wt. Pull 70k to 75k to 11966', all with near
flat-line CTP, then 65k to 11850'.
RIH to 11979', push negative wt to 12024'. Pull75k to 85k to
11960', stall, broke back, but still pull heavy 70k to 11850'. Pull
to 11524', seeing every shale. RIH. MW or tag in all shales
11690' - 11950'. Push hard starting 11950' , with and without
MW. Work BHA to 12123' with negative weight the entire way,
very little motor work. PUH 75k to 85k bottom 200'.
"Take-a-breather" wiper trip.
RIH. Inch along with negative weight to 12135'. Little motor
work. Also, we have gradually lost about 600 psi CTP since
this morning when we started to ream the fault area.
Continuous surveys indicate possible sidetrack, but doesn't
matter at this point. Concern: Entire BHA is past fault. Even if
we had sidetracked, we should be drilling 150 FPH as we did
yesterday in this area. Pump 15 bbl Lubetex pill to see if this
helps the slide. Nope.
POOH to check tools.
OOH. Check out tools. Nothing wrong with BHA. Decide to
pump cement. call cementers. MU nozzle.
RIH to EOP. Corrected -103'.
PJSM
RIH to 11450'. PU to the window. Tight spot at 11292'. POH
to 1 0630'.
Wait on cementers.
F'fll backside 3 BPM w/Nabors pump. Pump 2 bbls of fresh
water ahead. PfT cement lIines @4000 psi. OK. Pump 40
bbls of cement down the coil @ 2 BPM/1700 psi. 17 ppg, 0.25
ppb cellflake. SD backside. SI choke. Switch to rig pumps.
Bullhead cement at 2.5/870 psi. No wellhead pressure. POH
to 10430'. Reduce rate.
Mixing second batch of cement.
Pump second batch of cement. Bull head cement at 2.3/505
psi. No wellhead pressure. Call for more cement.
Wait on delivery of cement.
Crew change safety meeting. Discuss plans: Will use 18 ppb
aggregate in 40 bbls cement. Will put crude down backside in
order to keep a full column. This crude will not help us get a
squeeze, but will allow us to see start of squeeze.
Pump 100 bbls of crude down backside at 3.5 BPM. Caught
fluid at 26 bbls. SI backside. WHP = 130 psi. RIH to drift
openhole to 11400'. Clean. PUH. Place nozzle above window
at 1 0630'
Safety meeting with cementers.
Mix on the fly and load coil with 17 ppg cement: 5 bbls neat,
30 bbls w/18 ppb aggregate, 5 bbls neat. Took about 7 bbls
to catch fluid in coil. Load in coil at 2.5 BPM; 350 psi WHP.
Swap to Nabors pump (quick swap) and bullhead cement 3.0
BPM. Took 6 bbls to catch fluid again, and CTP went from 700
psi to 2600 psi; WHP up to 450 psi. With lead of cement at
fault, WHP started building and falling from 400 psi - 700 psi,
teasing us that we might get a squeeze. By the time aggregate
hit the fault, lost all fluctuation in WHP -- no hint of flow
Printed: 4/1/2002 11:16:19 AM
)
)
BP EXPLORATION
,Operations Summary Re,port
Page 11 of 14
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Y-37
Y -37 A
REENTER+COMPLETE
NABORS
NABORS 3S
Start: 3/12/2002
Rig Release: 3/31/2002
Rig Number:
Spud Date: 3/13/2002
End: 3/31/2002
Date From-. To Hours Activity Code NPT Phase Description of Operations
3/26/2002 09:00 - 11 :00 2.00 DRILL N DPRB PROD1 resistance. Pump it away. Did not want to slow down pump
beacuse of likely high side channeling.
11:00-15:15 4.25 DRILL N DPRB PROD1 Discuss next step with Anchorage gang. Will try conventional
LCM. Wait on MI to mix and deliver.
15:15-15:30 0.25 DRILL N DPRB PROD1 PJSM discuss pumping LCM pill.
15:30 - 16:50 1.33 DRILL N DPRB PROD1 PT lines to 4k. With coil at 10630' and shut-in annulus pumped
10 bbls Flopro followed by 38 bbls 40#/bbl LCM mud. Bullhead
the 10 bbls mud to loss zone and sen annulus pressures climb
from 200 to 700 psi. after pumping 2 bbls LCM 0 loss zone
presssure increased to 2000 psi. Shutdown pump pressure
dropped to 1800 psi. Bump back up to 2000 psi.
16:50 - 19:15 2.42 DRILL N DPRB PROD1 Circulate out remainder of LCM washdown to 11450'. Unable to
go further. Take returns to outside tanks.
19:15 - 19:30 0.25 DRILL N DPRB PROD1 PJSM for placement of kick-off cement plug.
19:30 - 20:15 0.75 DRILL N DPRB PROD1 PT lines to 4k. Pump 7 bbls 17.0 ppg neat "G" cement. Switch
to Nabors pump and displace to end of coil at 11450'. Lay-in
1 : 1 TO 1 0900'. pu II to safety at 1 0500'.
20: 15 - 20:45 0.50 DRILL N DPRB PROD1 WOC
20:45 - 21 :30 0.75 DRILL N DPRB PROD1 Switch to .5# bio water and dress off cement back down to
11200'. Notice bio water returns early. No cement returns seen
at surface?
21 :30 - 22:00 0.50 DRILL N DFAL PROD1 TOH pumping 2.5 bpm monitoring returns. At 9126' coil
operator noticed fluid spraying from coil coming over
gooseneck. Quickly shutdown pump and RIH below packoff.
Lose of weight on indicator. Checked to see if we still had the
coil by closeing the master valve. Valve completely closed coil
is parted.
22:00 - 23:15 1.25 DRILL N DFAL PROD1 End of coil just at the injector chains. Pull pins from the stuffing
box. Trolley up. Dressed EOP. Stab back on stuffing box. RIH
30'.
23: 15 - 00:00 0.75 DRILL N DFAL PROD1 Circulate wait on fishing tools. Top of fish +1- 2325'.
3/27/2002 00:00 - 04: 15 4.25 DRILL N DFAL PROD1 Revaluate present fishing tools available given the situation.
Should a disconnect be required during fishing operations it
would leave a 1.25" ID bore. This would prevent the use of a
CT chemical cutter with a 1.6875" OD (the only tool available).
Tracking locations of other tools that may work and other
possible fishing stratigies.
While waiting for further imput from town crew will proceed with
scheduled BOP test.
04:15 - 05:15 1.00 DRILL N DFAL PROD1 Freeze protect coil.
05: 15 - 05:45 0.50 DRILL N DFAL PROD1 Set TWC
05:45 - 13:30 7.75 DRILL N DFAL PROD1 Test BOPE. AOGCC rep Lou Grimaldi has wavied witnessing
test.
13:30 - 14:10 0.67 DRILL N DFAL PROD1 Pull TWC
14:10 -14:30 0.33 DRILL N DFAL PROD1 PJSM covering plu of bha and milling operations. Review with
crews future plans for this well.
14:30 - 16:15 1.75 DRILL N DFAL PROD1 Cut 60' of externally worn coil. Replaced pack-off elements on
injector.
16:15 -17:45 1.50 DRILL N DFAL PROD1 M/U BHA #16 and same time displace methanol from coil.
17:45 - 19:00 1.25 DRILL N DFAL PROD1 RIH tag top of fish at 2325.4'. This puts the bottom of fish at
11450'.
19:00 - 20:05 1.08 DRILL N DFAL PROD1 Milling top of CT fl 2325.4' to 2326.4'
20:05 - 20:40 0.58 DRILL N DFAL PROD1 TOH
Printed: 4/1/2002 11: 16: 19 AM
)
),
BP EXPLORATION
OpèrationsS u rnmaryRè port
Page 12 of 14
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Y-37
Y-37A
REENTER+COMPLETE
NABORS
NABORS 3S
Start: 3/12/2002
Rig Release: 3/31/2002
Rig Number:
Spud Date: 3/13/2002
End: 3/31/2002
DatEr From - To Hours: ActivitY Code NPT Phase Descriptic:m of Operåtions .
3/27/2002 20:40 - 21 :45 1.08 DRILL N DFAL PROD1 LID BHA #16 and freeze protect coil.
21 :45 - 00:00 2.25 DRILL N DFAL PROD1 Work at drifting 2 3/8" PH-6 tbg to 1.75". (It came to location
full of snow and ice. Covered with tarp and have used Tioga
heaters to unthaw since it's arrival to location)
3/28/2002 00:00 - 03:00 3.00 FISH N DFAL PROD1 Continue prepping PH-6 tbg string. (Examined the mill used on
the last run. Observed a piece of metal within the mill. Broke
the mill down. A 1/4"sq. X 4" strip of coil was loosely wrapped
just below the cross sectional cutting structure of the mill. Hard
to determine how this may have affected the actual milling
process as it fell out while breaking the mill down. Also no
apparent wear on the carbide within the bronze matrix on the
same cross sectional cutting structure. Although some wear to
the bronze nodes on the leading edge of cutting structure.
03:00 - 03:50 0.83 FISH N DFAL PROD1 Pick the milling BHA back up. P/U injector and displace
methonal.
03:50 - 04:30 0.67 FISH N DFAL PROD1 RIH with milling assembly
04:30 - 05:25 0.92 FISH N DFAL PROD1 Start milling. Free spin 1500. 2-300 psi motor work. Doesn't
appear to be milling anything. Like riding on a bearing.
05:25 - 06:15 0.83 FISH N DFAL PROD1 TOH to check mill wear. FP coil
06: 15 - 06:35 0.33 FISH N DFAL PROD1 Crew change PJSM
06:35 - 07:00 0.42 FISH N DFAL PROD1 LID mill. Mill shows very slight wear on the cross sectional
cutting area. Brass nodes worn down just enough to expose 2
small carbides. This may account for the small amount of
motor work we seen intially on this run and then the flattening
out of motor on-bottom pressure. Still believe brass nodes are
actting like a bearing surface upon the coil cross-sectional
area. As a precaution we PT'd the BHA & coil to 1500 psi
thinking a hole may have developed while milling. We seen a
150 psi drop while milling and could not get it back by
increasing WOB.
07:00 - 08:20 1.33 FISH N PROD1 FP coil and setback on deck. Rig-up floor to run PH-6 and
PJSM covering the p/u of this BHA.
08:20 - 12:30 4.17 FISH N PROD1 P/U BHA#17 2321.24'. Check up/dn wt 18k.
12:30 - 15:00 2.50 FISH N PROD1 R/U 2" hose to PH-6 and circulate wait on slickline unit
15:00 - 16:00 1.00 FISH N PROD1 P/U 1 stand and pup jts PH-6. RIH work overshot on CT. Pull to
55k (45k string + 10k block) no pipe movement noticed.
16:00 - 17:00 1.00 FISH N PROD1 RlU slickline unit.
17:00 - 22:30 5.50 FISH N PROD1 RIH wI 1.70" drift. Tagged top of coil at 2326'. Once into top
work through having to use spangs. Make 10 passes inlout of
top getting progressively better each time. RIH to 9383' and ran
into something that acts like thick fluid working drift down to
9435 in 1 hr. No overpulls while working down. Decide that this
deep enough. Past the first 4 GLM @ 3222', 5768', 7685',
9042'
Pull back up through top of coil. Plan to plu 1.74" swedge and
continue working top of coil.
22:30 - 00:00 1.50 FISH N PROD1 RID bales and rlu 2" x 20' slings to blocks/elevators.
3/29/2002 00:00 - 02:30 2.50 FISH N DFAL PROD1 Pick-up to 38k on pipe. Run 1.74" swedge through top of coil
tbg without much difficulty. POH with swedge.
02:30 - 03:30 1.00 FISH N DFAL PROD1 RID slickline unit.
03:30 - 04:30 1.00 FISH N DFAL PROD1 Wait on SLB wireline.
04:30 - 07:00 2.50 FISH N DFAL PROD1 PJSM with night crews. RIU SLB wireline unit and reconfigure
Printed: 4/1/2002 11: 16: 19 AM
)
)
BPEXPLORA TION
Operati,ons Summary Report
Page 13 of 14
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Y-37
Y -37 A
REENTER+COMPLETE
NABORS
NABORS 3S
Start: 3/12/2002
Rig Release: 3/31/2002
Rig Number:
Spud Date: 3/13/2002
End: 3/31/2002
Gate From - To Hours Activity Code NPT Phase Description of OÞ~ratiòns
3/29/2002 04:30 - 07:00 2.50 FISH N DFAL PROD1 slings/bales to fit SLB. PSJM with dayhands.
07:00 - 08:00 1.00 FISH N DFAL PROD1 P/U 18' wt bars and oil jars.
08:00 - 10:25 2.42 FISH N DFAL PROD1 P/U 55k wt on drillers console (45k string wt) RIH making a
dummy run with wt. bars. Unable to stab through top of coil.
Slack off to 45k and 40k no-go. P/U to 60k and fell through ok.
RIH some resistence at 8640', made it to 9375' and hit the
same problem from the previous drift run. Slacked off to 45k to
simulate cut string wt values. TOH without problem, slight
overpull at top of CT.
10:25 - 18:20 7.92 FISH N DFAL PROD1 PJSM on handling chem cutter. P/U same. P/U to 60k. RIH.
Went through top of CT but stopped at 2390'. Work pipe at
various weights. POH and drop bottom centrilizer. RIH tool
stopped same place. Try to pump down without success 1:1
returns .7 bpm POH I/d tool, drop GR plu 1 weight bar. Pull to
60k. RIH went past 2390' with no problem. RIH to 9375'. P/U
out of any contaminated fluid to 9315'. Slacked off string weight
to 50k. Fired cutter @ 1720 hrs good weight reduction back to
38k. P/U tool freely POH with cutter
18:20 - 19:00 0.67 FISH N DFAL PROD1 Crew change. PJSM about lid chemical cutter. LID same.
19:00 - 20:20 1.33 FISH N DFAL PROD1 RID sheaves, sling, eline unit etc. prep to lid 2 3/8" PH-6 tbg.
20:20 - 00:00 3.67 FISH N DFAL PROD1 Start laying down PH6 (72 joints total)
3/30/2002 00:00 - 01 :00 1.00 FISH N DFAL PROD1 Finish LD PH6, top of coil fish at surface. PU, set BOP pipe
slips on coil, cut coil, LD Baker overshot. Scaffolding crew on
location at 00:00
01 :00 - 02:00 1.00 FISH N DFAL PROD1 Set up scaffold as work platform approx. 5' above rig floor.
Need 7-8' of coil exposed above rig floor to allow spoolable
connector to be swallowed by chains on injector.
02:00 - 05:30 3.50 FISH N DFAL PROD1 Move injector into place on edge of rig floor, hand cut and
dress both ends of coil (fish and "reel side" of CT). Line up reel
side CT end w/ spoolable coil connector and MU. PU injector
and position above coil fish, align coil w/ spoolable connector
and attempt to MU. Pull test unsuccessful, we got more turns
than expected after both CT ends made up to spoolable
connector. Phone Nordic for 2nd spoolable connector. Dress
both ends of coil, MU 2nd spoolable connector to both ends of
CT. Pull test 25K over, good test.
05:30 - 06:30 1.00 FISH N DFAL PROD1 Lower injector and swallow spoolable connector into chains,
pooh, pipe parted just as connector was spooling on backside
of reel. Well-side end lodged in place behind spool. Spool has
significant backlash to deal with. Close and lock 2 3/8"
pipelslips rams.
06:30 - 11 :00 4.50 FISH N DFAL PROD1 Round up equipment to secure EOP at reel side, man-basket,
new spoolable connector etc. PJSM cover steps to secure
EOP.
11 :00 - 12:30 1.50 FISH N DFAL PROD1 Manbasket fuel pump failed, found leaking. WO another
manbasket to arrive. Review plans to handle coil.
12:30 - 16:00 3.50 FISH N DFAL PROD1 Install clamp to EOP and secure to forklift with 3/8" cable. RIH
keeping tension with forklift until EOP cleared manstand. Strip
off of well and cut coil 8' above floor. Clear coil from injector.
16:00 - 18:00 2.00 FISH N DFAL PROD1 PJSM about handling birdnest on the reel. Remove wind-on
coil connector, trim end. Re-stab coil to injector.
18:00 - 22:00 4.00 FISH N DFAL PROD1 Start cutting pipe from reel. Cut pipe in 15' sections, continue
this proces for two hours. Estimate we have approx. 1500' of
Printed: 4/1/2002 11:16:19 AM
)
')
./
BPEXPLORA TION
Operations SumrnaryReport
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Y-37
Y-37A
REENTER+COMPLETE
NABORS
NABORS 3S
Date
From - To Hours Activity Code NPT Phase
3/30/2002
18:00 - 22:00
4.00 FISH
N
DFAL PROD1
22:00 - 00:00
2.00 FISH
N
DFAL PROD1
3/31/2002
00:00 - 03:30
3.50 FISH
N
DFAL PROD1
03:30 - 04:00
0.50 FISH
N
DFAL PROD1
04:00 - 05: 15 1.25 FISH N DFAL PROD1
05:15 - 07:00 1.75 DEMOB P COMP
07:00 - 09:00 2.00 DEMOB P COMP
09:00 - 14:00 5.00 DEMOB P COMP
Page 14 of 14
Start: 3/12/2002
Rig Release: 3/31/2002
Rig Number:
Spud Date: 3/13/2002
End: 3/31/2002
DescriþtiOn ..òfOperations
coil (to cut in 10-15' sections) to remedy bird nest in
reel...decide to try a different approach, cutting sections is time
consuming. (Coil cutter does not perform nearly as well as
Nordic's.) Blind end of reel coil and thread back through mast
to the pad beside the coil cab. PJSM. Attach end of coil to
loader (to guide coil) and unspool1860' until the bird nest is
manageble, respool coil.
Cut & dress both ends of coil (fish and reel ct), MU new
spoolalbe CT connector (this one is longer then the others),
align ends of CT. Attach spoolable connector to reel end,
having trouble attaching to top of fish.
Attach new spoolable connector to both ends of coil. Test
connection, slowly ramp up to 25k Ibs over, closely inspect
connection & repeat pull test to 25K, good test. Rig down
scaffolding and prepare to pull CT fish out of the hole. Postion
injector to swallow the new connection with chains, open pipe
slips,
Begin POOH w/ 7000ft. long CT fish. Position connection near
reel and install a backup chain wI clamps on either end of the
spoolable connector. (To prevent birdnest in reel if coil parts
again) Remove horsehead on level-wind to allow room for
clamps to pass. Spool the connection onto the reel, success!
Reassemble Horsehead.
Resume POOH with CT fish. Freeze protect with MeOH from
2000' as we POOH. Downhole end of CT fish at surface. Close
MV.
Start rId preparations. Set BPV.
PJSM. Stab injector back on lubricator. Blowdown coil wI N2
through mudcross back to opentop tank.
Set injector back on deck. RID DS Unit #4. ND BOPE. Install
tree cap and test to 3500 psi.
Nabors 3S released at 1400 hrs 3-31-2002
Last report.
'~Ç-.Q~~\ç
Printed: 4/1/2002 11: 16: 19 AM
')
,)
Well:
Field:
API:
Permit:
Y-37A (Suspension)
Prudhoe Bay Unit
50-029-22403-01
202-046
Rig Accept: 03/13/02
Rig Spud: 03/16/02
Rig Release: 03/31/02
Drilling Rig: Nabors 38
POST RIG WORK
04/19/02
INSTALL GENERIC GL DESIGN IN STAT'S #6 & #7. SET 1500# TRO W/ BK LATCH @ 3206'.
04/20/02
INSTALL GENERIC GL DESIGN. SET 1" (20/64") OGLV IN STA #6 @ 5752' SLM. PULL SSCS. WELL RELEASE
TO PAD OPERATOR. ATTEMPTED, UNSUCCESSFULLY, TO FLOW WELL.
06/23/02
ATTEMPT TO SET GUIDE TOOL ON TOP OF COIL FISH. MADE MULlPLE GAUGE RING RUNS, BAILER
RUNS, AND MAGNET RUN, DEEPEST RUN 9326' WLM. RETRIEVED 4 PIECES OF METAL ON INITIAL
BAILER RUN ALONG WITH MUCH MUD SLURRY AND AN 8" x 2 1/2" PIECE OF MANGLED METAL (COILED
TUBING) W/ MAGNET.
06/24/02
RAN ENTRY GUIDE & SET ON COIL TUBING STUB @ 9327' SLM (3 + FEET DEEPER THAN PREVIOUS TAGS
INDICATING THAT GUIDE SWALLOWED COIL STUB AS PLANNED). RAN WI 1.7 SWAGE ON 5' ON 1.5 STEM
TO 9322' SLM, GAVE TOOLS ONE JIGGLE AND BOUNCED THRU GUIDE SUB, GOT PICK UP @ 9330',9335 &
9340, TOOLS WERE STICKING, DISCUSS RUN WI COMPANY REP, DECIDED THAT TOOLS WERE DEEP
ENOUGH INTO COIL SUB (18'). LEFT WELL SHUT-IN.
06/28/02
WELD ON CONNECTOR. MU JARS, 1.69" MOTOR, 1.82" PDSM. RIH. LOAD HOLE WITH 1% KCL. ENTERED
2-3/8" AT 9327' WLM OK, CONTINUE TO 9384'. STALLED MOTOR, NO FORWARD PROGRESS. PU TO LINER
TOP, ENCOUNTERED RESTRICTION AGAIN AT 9342'. WORKED 2 HOURS WITH NO PROGRESS. POH. MILL
IN GAUGE, 3 CHUNKS GONE FROM MATRIX. LD MILL, MOTOR & JARS. PU 1.69" DJN & BHA (OAL=4.47').
RIH, TAG AT 9340' CTMD. ATTEMPT TO MOVE RESTRICTION BY PUMPING AND RECIPROCATING PIPE
WITHOUT SUCCESS. POH. PU 1.84" 3 BLADE JUNK MILL. DRY TAG @ 9351'. MILL TO 9369', CONTINUE
MILLING.
06/29/02
MILUPUSH DOWN TO 9436.5'. TRIP UP OUT OF 23/8" COIL TO 9280'. MILUPUSH TO 9466'. HARD
TAGS/STALLS. TIME MILL TO 9470'. CONTINUE RIH TO 9592'. MILL ON JUNK. WORK TO 9650.6'. OVERPULL
TO 27000 LBS. NO FORWARD PROGRESS. POH TO CHECK MILL. MILL IN GAUGE, NO APPARENT DAMAGE
TO BHA, EXCEPT FOR ONE LONGITUDINAL SCAR ON THE TOP MOTOR SUB (1/8" X 2"). RIH, FREEZE
PROTECT TUBING WITH 35 BBLS AND FLOWLINE W/ 25 BBLS MEOH. RIG DOWN PENDING SLICK LINE
DIAGNOSTIC WORK. SUSPECT 2-3/8" IS IN COMPRESSION AND BUCKLED. MOTOR WORK SEEN IS DUE
TO THE CONTACT BETWEEN THE 1.69" BHA AND THE ID OF THE 2-3/8". WELL TO REMAIN SHUT IN.
01/08/03
TIO= 0/500/200 PRE BLEED FOR OA BUR. OA FL @ SURFACE. WELL IS SI.
ANADRILL
SCHLUMBERGER
Survey report
Client...................: BP Exploration (Alaska) Inc.
Field....................: Prudhoe Bay
Well. . . . . . . . . . . . . . . . . . . . .: Y-37A
API number...............: 50-029-22403-01
Engineer. . . . . . . . . . . . . . . . .: M. Aburto
RIG:.....................: Nabors 3S / SLB # 4
STATE: . . . . . . . . . . . . . . . . . . .: Alaska
----- Survey calculation methods-------------
Method for positions.....: Minimum curvature
Method for DLS.... .......: Mason & Taylor
----- Depth reference -----------------------
Permanent datum..........: MEAN SEA LEVEL
Depth reference..........: GR Tie-In @ 10670 ft
GL above permanent.......: 0.00 ft
KB above permanent.......: -50000.00 ft
DF above permanent.......: -50000.00 ft
----- Vertical section origin----------------
Latitude (+N/S-).........: 0.00 ft
Departure (+E/W-)........: 0.00 ft
----- Platform reference point---------------
Latitude (+N/S-).........: -999.25 ft
Departure (+E/W-)........: -999.25 ft
Azimuth from rotary table to target: 111.12 degrees
[(c)2002 Anadrill IDEAL ID6_1C_10J
26-Mar-2002 11:58:47
Spud date................:
Last survey date. ..... ...:
Total accepted surveys...:
MD of first survey.. .....:
MD of last survey........:
"
"
Page
1 of 3
15-Mar-02
26-Mar-02
37
10616.00 ft
12225.00 ft
.~
----- Geomagnetic data ----------------------
Magnetic model.. .........: BGGM version 2001
Magnetic date... ..... ....: 14-Mar-2002
Magnetic field strength..: 1149.87 HCNT
Magnetic dec (+E/W-).....: 26.31 degrees
Magnetic dip. '.'. .... ....: 80.76 degrees
----- MWD
Reference
Reference
Reference
Tolerance
Tolerance
Tolerance
survey Reference
G. . . . . . . . . . . . . . :
H..............:
Dip. . . . . . . . . . . . :
of G...........:
of H. . . . . . . . . . . :
of Dip.... . . . . . :
Criteria ---------
1002.68 mGal
1149.87 HCNT
80.76 degrees
(+/-) 2.50 mGal
(+/-) 6.00 HCNT
(+/-) 0.45 degrees
'~'
----- Corrections ---------------------------
Magnetic dec (+E/W-).....: 26.31 degrees
Grid convergence (+E/W-).: 0.00 degrees
Total az corr (+E/W-)....: 26.31 degrees
(Total az corr = magnetic dec - grid conv)
Sag applied (Y/N). .......: No degree: 0.00
<!
-
ANADRILL SCHLUMBERGER Survey Report 26-Mar-2002 11:58:47 Page 2 of 3
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seg Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool qual
(ft) (deg) ( deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
1 10616.00 17.00 161.60 0.00 8754.72 3773.09 -4623.73 2258.79 5145.97 153.96 0.00 TIP
2 10650.00 16.66 162.81 34.00 8787.26 3779.28 -4633.10 2261.80 5155.71 153.98 1.44 MWD
3 10667.95 21.70 163.85 17.95 8804.21 3782.89 -4638.75 2263.48 5161.53 153.99 28.14 MWD
4 10707.25 39.93 164.63 39.30 8837.82 3794.89 -4658.06 2268.89 5181.25 154.03 46.40 MWD
5 10764.60 63.95 165.21 57.35 8872.92 3821.33 -4701.35 2280.52 5225.27 154.12 41.89 SP
6 10774.63 67.98 162.89 10.03 8877.00 3826.85 -4710.15 2283.04 5234.29 154.14 45.34 SP
10794.85 156.86 20.22 8883.29 3839.52 -4728.16 2289.66 5253.39 154.16 47.86 SP '-~
7 75.78
8 10821.84 80.48 150.06 26.99 8888.85 3859.04 -4751.76 2301.47 5279.77 154.16 30.16 SP
9 10835.00 80.54 147.57 13.16 8891.02 3869.31 -4762.87 2308.19 5292.70 154.14 18.67 MWD
10 10873.86 92.06 146.39 38.86 8893.53 3900.69 -4795.33 2329.29 5331.11 154.09 29.80 MWD
11 10909.30 89.80 145 .31 35.44 8892.95 3929.80 -4824.65 2349.18 5366.18 154.04 7.07 SP
12 10960.00 92.74 138.77 50.70 8891.83 3973.26 -4864.59 2380.33 5415.74 153.93 14.14 MWD
13 11018.93 91.85 127.51 58.93 8889.46 4027.76 -4904.78 2423.23 5470.73 153.71 19.15 SP
14 11096.96 90.68 116.79 78.03 8887.73 4104.22 -4946.23 2489.18 5537.26 153.29 13.82 MWD
15 11120.50 92.16 112.56 23.54 8887.15 4127.70 -4956.05 2510.56 5555.66 153.13 19.03 MWD
16 11164.00 89.55 109.50 43.50 8886.50 4171.18 -4971.66 2551.15 5588.00 152.84 9.24 MWD
17 11249.24 88.00 102.21 85.24 8888.33 4255.99 -4994.93 2633.07 5646.45 152.20 8.74 SP
18 11305.50 91.06 98.15 56.26 8888.79 4311.20 -5004.87 2688.43 5681.23 151.76 9.04 MWD
19 11343.00 90.24 94.34 37.50 8888.36 4347.44 -5008.94 2725.69 5702.54 151.45 10.39 MWD
20 11389.00 91.06 90.76 46.00 8887.84 4391.03 -5010.99 2771.64 5726.43 151.05 7.98 MWD
21 11443.00 89.28 86.65 54.00 8887.68 4440.94 -5009.77 2825.61 5751.68 150.58 8.29 MWD '---/
22 11486.00 89.52 83.19 43.00 8888.13 4479.51 -5005.96 2868.43 5769.54 150.19 8.07 MWD
23 11527.00 91.41 83.92 41.00 8887.80 4515.86 -5001.36 2909.17 5785.92 149.81 4.94 MWD
24 11550.92 89.93 87.46 23.92 8887.52 4537.45 -4999.57 2933.02 5796.40 149.60 16.04 SP
25 11599.50 87.19 94.30 48.58 8888.74 4582.99 -5000.31 2981.54 5821.74 149.19 15.16 MWD
26 11648.50 87.84 99.55 49.00 8890.86 4630.43 -5006.21 3030.12 5851.82 148.81 10.79 MWD
27 11667.58 88.40 97.71 19.08 8891.49 4649.05 -5009.07 3048.97 5864.05 148.67 10.08 SP
28 11714.31 87.80 94.59 46.73 8893.04 4694.16 -5014.07 3095.40 5892.57 148.31 6.82 SP
29 11806.11 91.07 100.99 91.80 8893.95 4783.42 -5026.50 3186.29 5951.31 147.63 7.84 MWD
30 11860.79 97.20 101.86 54.68 8890.00 4837.15 -5037.29 3239.72 5989.17 147.25 11.32 MWD
[(c)2002 Anadrill IDEAL ID6 1C 10]
-
.c
"
ANADRILL SCHLUMBERGER Survey Report 26-Mar-2002 11:58:47 Page 3 of 3
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seg Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool qual
(ft) (deg) ( deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
31 11895.50 95.32 107.70 34.71 8886.22 4871.43 -5046.10 3273.07 6014.65 147.03 17.58 MWD
32 11979.12 84.68 117.16 83.62 8886.22 4954.81 -5077.92 3350.16 6083.49 146.59 17.02 SP
33 12010.50 84.88 123.33 31.38 8889.07 4985.65 -5093.65 3377.15 6111.50 146.46 19.59 MWD
34 12069.77 83.23 122.04 59.27 8895.22 5043.40 -5125.48 3426.76 6165.49 146.23 3.55 SP
35 12137.05 87.18 115.06 67.28 8900.85 5109.83 -5157.48 3485.61 6224.88 145.95 11.88 SP
36 12180.48 91.85 114.44 43.43 8901.22 5153.16 -5175.65 3525.04 6262.06 145.74 10.85 SP
37 12225.00 91.00 109.50 44.52 8900.11 5197.65 -5192.30 3566.31 6299.08 145.52 11.23 Proj. ~~
[(c) 2002 Anadrill IDEAL ID6 1C 10]
-
~
<.,'
ö
Y -37 A
Survey Report - Geodetic
Schlumberger
Report Date: 02-Apr-2002 Survey I DLS Computation Method: Minimum Curvature / Lubinski
Client: BP Exploration Alaska Vertical Section Azimuth: 111.120°
Field: Prudhoe Bay Unit - WOA (Drill Pads) Vertical Section Origin: N 0.000 ft. E 0.000 f1
Structure I Slot: V-PAD / V-37 TVD Reference Datum: MSL
Well: V-37 TVD Reference Elevation: 0.000 ft relative to MSL
Borehole: V-37A Sea Bed / Ground Level Elevation: 50.000 ft relative to MSL
UWUAPI#: 500292240301 Magnetic Declination: +26.295°
Survey Name 1 Date: V -37 A / March 26, 2002 Total Field Strength: 57492.813 n1
Tort / AHD 1 DDlI ERD ratio: 353.741° / 6709.61 ft/ 6.513 / 0.754 Magnetic Dip: 80.765°
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4, US Feet Declination Date: March 26, 2002 '-'
Location LatlLong: N 70.26762332, W 148.83116474 Magnetic Declination Model: BGGM 2001
Location Grid N/E Y/X: N 5948825.220 ftUS, E 644540.760 ftUS North Reference: True North
Grid Convergence Angle: +1.10021858° Total Corr Mag North -> True North: +26.295°
Grid Scale Factor: 0.99992373 Local Coordinates Referenced To: Well Head
Grid Coordinates Geographic Coordinates
Station ID MD Incl Azim TVD vSec NI-S EJ-W DLS Northing Easting Latitude Longitude
(ft) (") (") (ft) (ft) (ft) (ft) (Q/100ft) (ftUS) (ftUS)
0.00 0.00 0.00 -79.1 0 0.00 0.00 0.00 5948825.22 644540.76 N 70.26762332 W 148.83116474
126.00 0.90 265.30 46.89 -0.89 -0.08 -0.99 0.71 5948825.12 644539.78 N 70.26762310 W 148.83117272
224.00 1.00 286.40 144.88 -2.44 0.10 -2.57 0.37 5948825.27 644538.19 N 70.26762358 W 148.83118555
316.00 1.40 282.20 236.86 -4.35 0.56 -4.44 0.44 5948825.70 644536.31 N 70.26762485 W 148.83120066
408.00 1.80 281.80 328.83 -6.88 1.09 -6.96 0.43 5948826.18 644533.79 N 70.26762631 W 148.83122098
499.00 1.70 241.80 419.79 -9.17 0.75 -9.54 1.32 5948825.79 644531 .20 N 70.26762536 W 148.83124191
592.00 1.90 210.10 512.74 -10.31 -1.24 -11 .53 1.08 5948823.76 644529.25 N 70.26761994 W 148.83125799
685.00 2.70 171.10 605.67 -9.46 -4.74 -11.97 1.84 5948820.26 644528.89 N 70.26761038 W 148.83126150
778.00 4.20 154.90 698.50 -5.90 -9.98 -10.18 1.91 5948815.04 644530.77 N 70.26759604 W 148.831247Ot
872.00 4.20 133.1 0 792.26 -0.22 -15.45 -6.21 1.69 5948809.65 644534.85 N 70.26758110 W 148.83121495~
966.00 4.30 135.20 886.00 6.18 -20.31 -1.21 0.20 5948804.90 644539.94 N 70.26756785 W 148.83117455
1060.00 4.00 128.20 979.75 12.54 -24.83 3.85 0.63 5948800.47 644545.08 N 70.26755548 W 148.83113365
1154.00 4.60 122.90 1073.49 19.36 -28.91 9.59 0.76 5948796.50 644550.90 N 70.26754434 W 148.83108723
1247.00 4.50 124.30 1166.19 26.56 -32.99 15.73 0.16 5948792.54 644557.12 N 70.26753319 W 148.83103754
1341.00 4.40 121.90 1259.91 33.70 -36.97 21.84 0.22 5948788.68 644563.30 N 70.26752231 W 148.83098816
1435.00 4.20 135.20 1353.65 40.38 -41.32 27.33 1.08 5948784.43 644568.87 N 70.26751043 W 148.83094380
1528.00 4.30 153.50 1446.40 46.07 -46.86 31.28 1.46 5948778.97 644572.93 N 70.26749530 W 148.83091182
1622.00 4.20 158.80 1540.14 50.99 -53.22 34.10 0.43 5948772.67 644575.87 N 70.26747792 W 148.83088904
Y-37A ASP Final Survey.xls
Page 1 of 5
4/18/2002-3:01 PM
.'
Grid Coordinates Geographic Coordinates
Station ID MD Incl Azim TVD vSec N/-S EJ-W DLS Northing Easting Latitude Longitude
(ft) (°) (°) (ft) (ft) (ft) (ft) (0/100ft) (ftUS) (ftUS)
1717.00 4.70 162.00 1634.85 55.78 -60.17 36.56 0.59 5948765.77 644578.47 N 70.26745895 W 148.83086914
1807.00 4.70 160.20 1724.55 60.53 -67.14 38.95 0.16 5948758.84 644580.99 N 70.26743989 W 148.83084983
1899.00 5.10 158.40 1816.21 65.77 -74.49 41.73 0.47 5948751.55 644583.91 N 70.26741981 W 148.83082734
1992.00 6.00 163.50 1908.78 71.54 -82.99 44.63 1.10 5948743.10 644586.98 N 70.26739658 W 148.83080387
2086.00 7.50 161.60 2002.12 78.44 -93.53 47.97 1.61 5948732.64 644590.51 N 70.26736781 W 148.83077694
2177.00 9.10 163.00 2092.17 86.67 -106.05 51.94 1.77 5948720.20 644594.73 N 70.26733361 W 148.83074477
2271.00 12.00 158.80 2184.57 97.84 -122.27 57.65 3.19 5948704.09 644600.74 N 70.26728929 W 148.83069861
2364.00 15.10 155.30 2274.97 113.04 -142.29 66.21 3.45 5948684.24 644609.69 N 70.26723459 W 148.83062941
2458.00 17.80 154.60 2365.12 132.25 -166.40 77.49 2.88 5948660.35 644621.43 N 70.26716873 W 148.83053820
2553.00 20.00 155.60 2454.99 154.38 -194.31 90.44 2.34 5948632.69 644634.90 N 70.26709246 W 148.8304335
2648.00 22.90 154.20 2543.40 179.47 -225.76 105.19 3.10 5948601.54 644650.26 N 70.26700656 W 148.83031424-/
2740.00 26.00 152.80 2627.14 207.62 -259.82 122.21 3.43 5948567.82 644667.92 N 70.26691352 W 148.83017670
2834.00 28.90 155.30 2710.55 239.30 -298.79 141.12 3.32 5948529.22 644687.58 N 70.26680705 W 148.83002379
2928.00 31.40 154.20 2791 .83 273.48 -341.48 161.27 2.72 5948486.93 644708.55 N 70.26669042 W 148.82986086
3022.00 33.80 154.60 2871.01 310.34 -387.15 183.15 2.56 5948441.69 644731.29 N 70.26656565 W 148.82968401
3115.00 35.40 152.10 2947.57 349.45 -434.33 206.85 2.30 5948394.98 644755.90 N 70.26643676 W 148.82949239
3208.00 37.30 152.10 3022.47 391.07 -483.04 232.64 2.04 5948346.77 644782.62 N 70.26630368 W 148.82928387
3304.00 40.40 152.50 3097.22 436.38 -536.35 260.63 3.24 5948294.01 644811.62 N 70.26615802 W 148.82905765
3404.00 41.10 150.00 3172.98 486.29 -593.57 292.03 1.78 5948237.41 644844.11 N 70.26600171 W 148.82880381
3487.00 40.70 150.40 3235.72 528.47 -640.73 319.03 0.58 5948190.79 644872.01 N 70.26587288 W 148.82858548
3580.00 40.40 151.10 3306.38 575.04 -693.48 348.58 0.59 5948138.62 644902.56 N 70.26572877 W 148.82834665
3675.00 40.10 151.10 3378.89 622.07 -747.21 378.24 0.32 5948085.47 644933.25 N 70.26558196 W 148.82810685
3768.00 39.60 150.00 3450.29 668.10 -799.1 0 407.54 0.93 5948034.15 644963.53 N 70.26544019 W 148.82787003
3862.00 39.00 153.20 3523.04 713.38 -851.46 435.86 2.25 5947982.36 644992.85 N 70.26529716 W 148.82764112
3956.00 40.70 153.90 3595.20 757.83 -905.39 462.68 1.87 5947928.96 645020.70 N 70.26514983 W 148.8274243--
4049.00 40.30 153.20 3665.92 802.41 -959.46 489.58 0.65 5947875.41 645048.63 N 70.26500209 W 148.82720686-,
4141.00 40.10 152.80 3736.19 846.62 -1012.37 516.54 0.35 5947823.03 645076.60 N 70.26485754 W 148.82698895
4236.00 39.90 152.80 3808.96 892.23 -1066.68 544.45 0.21 5947769.27 645105.55 N 70.26470916 W 148.82676333
4330.00 39.80 152.80 3881.13 937.21 -1120.26 571.98 0.11 5947716.24 645134.10 N 70.26456280 W 148.82654079
4423.00 41.00 154.60 3951.95 981 .58 -1174.29 598.68 1.80 5947662.73 645161 .82 N 70.26441517 W 148.82632503
4517.00 40.30 154.60 4023.27 1026.02 -1229.61 624.94 0.74 5947607.94 645189.15 N 70.26426405 W 148.82611274
4612.00 40.20 154.20 4095.78 1070.70 -1284.96 651.46 0.29 5947553.10 645216.72 N 70.26411281 W 148.82589838
4704.00 39.90 154.60 4166.20 1113.80 -1338.35 677.04 0.43 5947500.22 645243.32 N 70.26396696 W 148.82569164
4798.00 39.80 154.90 4238.37 1157.40 -1392.83 702.74 0.23 5947446.25 645270.05 N 70.26381812 W 148.82548397
4892.00 40.00 156.30 4310.48 1200.42 -1447.73 727.64 0.98 5947391.84 645296.01 N 70.26366811 W 148.82528268
Y -37 A ASP Final Survey.xls
Page 2 of 5
4/18/2002-3:01 PM
Grid Coordinates Geographic Coordinates
Station ID MD Incl Azim TVD vSec N/-S EJ-W DLS Northing Easting Latitude Longitude
(ft) (") (") (ft) (ft) (ft) (ft) (0/100ft) (ftUS) (ftUS)
4985.00 42.80 156.00 4380.24 1243.88 -1503.98 752.51 3.02 5947336.09 645321.95 N 70.26351445 W 148.82508169
5079.00 42.10 156.00 4449.60 1288.84 -1561.94 778.32 0.74 5947278.64 645348.86 N 70.26335610 W 148.82487313
5172.00 41.80 156.00 4518.76 1332.89 -1618.73 803.60 0.32 5947222.34 645375.23 N 70.26320094 W 148.82466878
5268.00 43.10 156.00 4589.60 1378.80 -1677.92 829.96 1.35 5947163.67 645402.71 N 70.26303922 W 148.82445580
5362.00 42.70 156.00 4658.46 1424.14 -1736.38 855.98 0.43 5947105.73 645429.86 N 70.26287952 W 148.82424547
5455.00 43.50 156.00 4726.36 1469.17 -1794.43 881.83 0.86 5947048.19 645456.81 N 70.26272092 W 148.82403660
5550.00 44.10 156.30 4794.93 1515.64 -1854.57 908.41 0.67 5946988.58 645484.54 N 70.26255661 W 148.82382176
5645.00 44.00 156.00 4863.21 1562.32 -1914.98 935.12 0.24 5946928.70 645512.40 N 70.26239157 W 148.82360593
5739.00 43.80 156.30 4930.94 1608.38 -1974.59 961.48 0.31 5946869.61 645539.90 N 70.26222870 W 148.82339296
5834.00 44.40 157.00 4999.16 1654.69 -2035.29 987.68 0.81 5946809.43 645567.26 N 70.26206287 W 148.8231812.
5927.00 44.70 156.30 5065.44 1700.40 -2095.19 1013.54 0.62 5946750.04 645594.26 N 70.26189922 W 148.82297228~
6020.00 44.20 156.70 5131.83 1746.14 -2154.91 1039.51 0.62 5946690.83 645621.37 N 70.26173605 W 148.82276243
6115.00 43.60 155.30 5200.28 1792.82 -2215.09 1 066.29 1.20 5946631.19 645649.30 N 70.26157164 W 148.82254598
6208.00 43.60 155.30 5267.63 1838.81 -2273.36 1093.09 0.00 5946573.45 645677.22 N 70.26141245 W 148.82232943
6303.00 45.30 154.90 5335.44 1886.68 -2333.69 1121.11 1.81 5946513.66 645706.38 N 70.26124759 W 148.82210308
6397.00 45.30 156.70 5401 .56 1934.19 -2394.63 1148.49 1.36 5946453.27 645734.93 N 70.26108110 W 148.82188179
6492.00 45.60 154.20 5468.21 1982.61 -2456.20 1176.62 1.90 5946392.25 645764.23 N 70.26091289 W 148.82165452
6586.00 44.90 154.60 5534.39 2031.21 -2516.40 1205.47 0.80 5946332.62 645794.23 N 70.26074841 W 148.82142145
6680.00 44.30 155.30 5601.32 2078.83 -2576.20 1233.41 0.83 5946273.38 645823.31 N 70.26058504 W 148.82119564
6775.00 44.70 154.20 5669.08 2127.02 -2636.42 1261.82 0.91 5946213.72 645852.87 N 70.26042051 W 148.82096614
6870.00 45.00 153.50 5736.43 2176.24 -2696.56 1291 .35 0.61 5946154.16 645883.54 N 70.26025620 W 148.82072756
6964.00 44.60 153.50 5803.13 2225.16 -2755.83 1320.90 0.43 5946095.47 645914.23 N 70.26009425 W 148.82048877
7059.00 42.80 152.50 5871.81 2274.02 -2814.32 1350.69 2.03 5946037.58 645945.13 N 70.25993447 W 148.82024811
7153.00 42.80 152.50 5940.78 2321.94 -2870.97 1380.18 0.00 5945981.51 645975.70 N 70.25977968 W 148.82000984
7249.00 42.90 152.10 6011.16 2371.08 -2928.77 1410.53 0.30 5945924.30 646007.15 N 70.25962175 W 148.8197646/
7344.00 42.90 151.80 6080.76 2420.01 -2985.84 1440.94 0.21 5945867.83 646038.65 N 70.25946582 W 148.81951896~
7438.00 42.70 151.10 6149.73 2468.70 -3041.94 1471.46 0.55 5945812.33 646070.24 N 70.25931254 W 148.81927236
7532.00 42.70 151 .40 6218.81 2517.44 -3097.83 1502.12 0.22 5945757.04 646101.97 N 70.25915984 W 148.81902464
7626.00 42.50 151.80 6288.00 2565.84 -3153.80 1532.38 0.36 5945701.67 646133.29 N 70.25900692 W 148.81878015
7720.00 42.40 151.10 6357.36 2614.20 -3209.53 1562.71 0.51 5945646.54 646164.68 N 70.25885465 W 148.81853519
7813.00 41.60 151.10 6426.47 2661.89 -3264.01 1592.78 0.86 5945592.65 646195.79 N 70.25870580 W 148.81829223
7908.00 41.10 152.50 6497.79 2709.48 -3319.32 1622.44 1.11 5945537.92 646226.50 N 70.25855469 W 148.81805262
8000.00 40.70 152.80 6567.33 2754.58 -3372.82 1650.11 0.48 5945484.97 646255.20 N 70.25840851 W 148.81782906
8092.00 40.40 152.10 6637.23 2799.49 -3425.85 1677.78 0.59 5945432.48 646283.87 N 70.25826362 W 148.81760560
8188.00 40.20 151 .80 6710.45 2846.47 -3480.65 1706.97 0.29 5945378.26 646314.11 N 70.25811390 W 148.81736973
Y-37A ASP Final Survey.xls
Page 3 of 5
4/18/2002-3:01 PM
Grid Coordinates Geographic Coordinates
Station ID MD Incl Azim TVD vSec N/-S EI-W DLS Northing Easting Latitude Longitude
(ft) (") (") (ft) (ft) (ft) (ft) (°/1000) (ftUS) (ftUS)
8283.00 39.90 151.80 6783.17 2892.83 -3534.52 1735.86 0.32 5945324.96 646344.03 N 70.25796670 W 148.81713639
8378.00 39.70 151.80 6856.16 2938.94 -3588.11 1764.60 0.21 5945271.93 646373.78 N 70.25782027 W 148.81690426
8472.00 39.50 152.80 6928.59 2984.04 -3641 .16 1792.45 0.71 5945219.43 646402.65 N 70.25767533 W 148.81667927
8566.00 39.00 152.1 0 7001.38 3028.70 -3693.89 1819.96 0.71 5945167.24 646431.16 N 70.25753126 W 148.81645709
8661.00 38.70 152.50 7075.36 3073.55 -3746.65 1847.66 0.41 5945115.03 646459.87 N 70.25738710 W 148.81623333
8756.00 37.60 153.20 7150.07 3117.35 -3798.87 1874.44 1.24 5945063.34 646487.64 N 70.25724443 W 148.81601700
8850.00 38.50 153.90 7224.09 3160.11 -3850.74 1900.24 1.06 5945011.98 646514.43 N 70.25710270 W 148.81580859
8945.00 38.10 154.20 7298.65 3203.22 -3903.68 1926.01 0.46 5944959.54 646541.21 N 70.25695805 W 148.81560049
9040.00 37.80 153.50 7373.56 3246.13 -3956.12 1951.75 0.55 5944907.61 646567.96 N 70.25681476 W 148.81539254
9135.00 37.20 154.20 7448.93 3288.61 -4008.03 1977.24 0.77 5944856.20 646594.44 N 70.25667293 W 148.8151866
9229.00 36.70 153.90 7524.05 3329.98 -4058.84 2001.97 0.57 5944805.88 646620.13 N 70.25653411 W 148.81498697-"
9323.00 36.00 153.20 7599.76 3371.10 -4108.73 2026.78 0.87 5944756.49 646645.89 N 70.25639781 W 148.81478656
9418.00 34.90 153.90 7677.15 3411 .77 -4158.05 2051.33 1.23 5944707.64 646671 .38 N 70.25626303 W 148.81458832
9513.00 33.50 153.50 7755.72 3451.09 -4205.92 2074.98 1.49 5944660.24 646695.95 N 70.25613223 W 148.81439727
9606.00 32.20 154.90 7833.85 3487.94 -4251.33 2096.95 1.62 5944615.26 646718.78 N 70.25600816 W 148.81421989
9699.00 30.60 154.60 7913.22 3523.01 -4295.16 2117.61 1.73 5944571.85 646740.28 N 70.25588842 W 148.81405300
9794.00 29.10 156.00 7995.62 3556.93 -4338.11 2137.38 1.74 5944529.29 646760.87 N 70.25577107 W 148.81389335
9888.00 27.70 155.60 8078.30 3588.71 -4378.89 2155.70 1.50 5944488.87 646779.97 N 70.25565965 W 148.81374538
9982.00 26.40 153.90 8162.02 3619.64 -4417.55 2173.92 1.61 5944450.57 646798.93 N 70.25555400 W 148.81359824
10077.00 24.30 156.30 8247.87 3648.92 -4454.42 2191.07 2.46 5944414.04 646816.78 N 70.25545326 W 148.81345974
10169.00 21.90 157.70 8332.49 3674.06 -4487.63 2205.20 2.68 5944381.10 646831 .54 N 70.25536252 W 148.81334571
10265.00 20.50 158.10 8421.99 3697.84 -4519.80 2218.26 1.47 5944349.20 646845.22 N 70.25527464 W 148.81324022
10360.00 19.40 157.40 8511.29 3720.09 -4549.80 2230.53 1.18 5944319.44 646858.06 N 70.25519267 W 148.81314116
10454.00 18.30 158.80 8600.24 3740.82 -4577.97 2241.86 1.27 5944291.49 646869.93 N 70.25511569 W 148.81304962
10549.00 17.30 159.50 8690.70 3760.24 -4605.11 2252.21 1.08 5944264.56 646880.79 N 70.25504155 W 148.8129661?
10616.00 17.00 161.60 8754.72 3773.09 -4623.73 2258.79 1.03 5944246.07 646887.73 N 70.25499066 W 148.8129130ú_'
10667.95 21.70 163.85 8803.72 3783.75 -4640.17 2263.86 9.16 5944229.73 646893.11 N 70.25494574 W 148.81287206
10707.25 39.93 164.63 8837.33 3795.75 -4659.48 2269.27 46.40 5944210.54 646898.89 N 70.25489300 W 148.81282840
10764.60 63.95 165.21 8872.43 3822.19 -4702.77 2280.89 41.89 5944167.48 646911.35 N 70.25477472 W 148.81273457
10774.63 67.98 162.89 8876.51 3827.72 -4711.57 2283.41 45.39 5944158.72 646914.03 N 70.25475067 W 148.81271423
10794.85 75.78 156.86 8882.80 3840.39 -4729.59 2290.04 47.85 5944140.84 646921 .00 N 70.25470146 W 148.81266075
10821.84 80.48 150.06 8888.36 3859.90 -4753.19 2301.84 30.18 5944117.48 646933.25 N 70.25463697 W 148.81256544
10835.00 80.54 147.57 8890.53 3870.17 -4764.29 2308.56 18.67 5944106.50 646940.19 N 70.25460663 W 148.81251116
10873.86 92.06 146.39 8893.03 3901 .55 -4796.75 2329.66 29.80 5944074.46 646961.90 N 70.25451793 W 148.81234076
10909.30 89.80 145.31 8892.45 3930.67 -4826.07 2349.55 7.07 5944045.53 646982.35 N 70.25443781 W 148.81218012
Y-37A ASP Final Survey.xls
Page 4 of 5
4/18/2002-3:01 PM
Grid Coordinates Geographic Coordinates
Station ID MD Incl Azim TVD vSec NI-S E/-W DLS Northing Easting Latitude Longitude
(ft) (") (") (ft) (ft) (ft) (ft) (o/100ft) (ftUS) (ftUS)
10960.00 92.74 138.77 8891.33 3974.12 -4866.01 2380.71 14.14 5944006.20 647014.27 N 70.25432867 W 148.81192847
11018.93 91.85 127.51 8888.96 4028.62 -4906.21 2423.60 19.15 5943966.83 647057.92 N 70.25421882 W 148.81158196
11096.96 90.68 116.79 8887.23 4105.08 -4947.66 2489.55 13.82 5943926.66 647124.65 N 70.25410552 W 148.81104918
11120.50 92.16 112.56 8886.65 4128.56 -4957.48 2510.93 19.03 5943917.25 647146.22 N 70.25407867 W 148.81087647
11164.00 89.55 109.50 8886.00 4172.05 -4973.08 2551.52 9.24 5943902.43 647187.09 N 70.25403600 W 148.81054855
11249.24 88.00 102.21 8887.83 4256.85 -4996.35 2633.44 8.74 5943880.74 647269.44 N 70.25397236 W 148.80988670
11305.50 91.06 98.15 8888.29 4312.06 -5006.29 2688.80 9.04 5943871.87 647324.97 N 70.25394515 W 148.80943947
11343.00 90.24 94.34 8887.86 4348.30 -5010.37 2726.07 10.39 5943868.51 647362.31 N 70.25393398 W 148.80913836
11389.00 91.06 90.76 8887.34 4391 .89 -5012.42 2772.01 7.98 5943867.34 647408.28 N 70.25392834 W 148.80876715
11443.00 89.28 86.65 8887.18 4441 .80 -5011.20 2825.98 8.29 5943869.60 647462.21 N 70.25393162 W 148.8083310
11486.00 89.52 83.18 8887.63 4480.37 -5007.39 2868.80 8.09 5943874.23 647504.95 N 70.25394199 W 148.80798505-'
11527.00 91.41 83.92 8887.30 4516.71 -5002.78 2909.54 4.95 5943879.62 647545.59 N 70.25395452 W 148.80765588
11550.92 89.93 87.46 8887.02 4538.31 -5000.98 2933.39 16.04 5943881.87 647569.39 N 70.25395941 W 148.80746320
11599.50 87.18 94.30 8888.24 4583.84 -5001.73 2981.91 15.17 5943882.06 647617.92 N 70.25395733 W 148.80707112
11648.50 87.84 99.55 8890.38 4631.29 -5007.63 3030.49 10.79 5943877.09 647666.60 N 70.25394115 W 148.80667863
11667.58 88.40 97.71 8891 .00 4649.90 -5010.49 3049.34 10.08 5943874.59 647685.50 N 70.25393332 W 148.80652630
11714.31 87.80 94.59 8892.55 4695.02 -5015.49 3095.77 6.80 5943870.48 647732.02 N 70.25391960 W 148.80615118
11806.11 91.08 100.99 8893.45 4784.28 -5027.93 3186.66 7.83 5943859.80 647823.12 N 70.25388552 W 148.80541684
11860.79 97.20 101.86 8889.50 4838.01 -5038.72 3240.09 11.30 5943850.03 647876.74 N 70.25385596 W 148.80498517
11895.50 95.32 107.70 8885.72 4872.29 -5047.52 3273.44 17.58 5943841.87 647910.25 N 70.25383188 W 148.80471578
11979.12 84.68 117.16 8885.72 4955.67 -5079.35 3350.53 17.02 5943811.54 647987.94 N 70.25374485 W 148.80409297
12010.50 84.88 123.33 8888.57 4986.51 -5095.08 3377.52 19.59 5943796.32 648015.21 N 70.25370183 W 148.80387502
12069.77 83.23 122.04 8894.71 5044.26 -5126.91 3427.13 3.53 5943765.45 648065.42 N 70.25361481 W 148.80347427
12137.05 87.18 115.06 8900.34 5110.69 -5158.92 3485.98 11.89 5943734.58 648124.87 N 70.25352729 W 148.80299890
12180.48 91.85 114.43 8900.71 5154.02 -5177.09 3525.41 10.85 5943717.17 648164.64 N 70.25347760 W 148.8026803f
12225.00 91.00 109.50 8899.60 5198.51 -5193.73 3566.67 11.23 5943701.33 648206.21 N 70.25343208 W 148.8023470~,~
Y-37A ASP Final Survey.xls
Page 5 of 5
4/18/2002-3:01 PM
ANADRILL
SCHLUMBERGER
Survey report
Client...................: BP Exploration (Alaska) Inc.
Field........ ............: Prudhoe Bay
Well. . . . . . . . . . . . . . . . . . . . .: Y-37a Pb-1
API number...............: 50-029-22403-70
Engineer.................: M. Brown
RIG: . . . . . . . . . . . . . . . . . . . . .: Nabors 3 S
STATE: . . . . . . . . . . . . . . . . . . .: Alaska
----- Survey calculation methods-------------
Method for positions.....: Minimum curvature
Method for DLS...........: Mason & Taylor
----- Depth reference -----------------------
Permanent datum..........: Mean Sea Level
Depth reference..........: GR Tie-In @ 10670 ft
GL above permanent.. .....: -50000.00 ft
KB above permanent. ......: -50000.00 ft
DF above permanent.......: -50000.00 ft
----- Vertical section origin----------------
Latitude (+N/S-).........: 0.00 ft
Departure (+E/W-)........: 0.00 ft
----- Platform reference point---------------
Latitude (+N/S-).........: -999.25 ft
Departure (+E/W-)........: -999.25 ft
Azimuth from rotary table to target: 111.12 degrees
[(c)2002 Anadrill IDEAL ID6_1C_10J
19-Mar-2002 11:10:47
Spud date... . . . . . . . . . . . . . :
Last survey date...... ...:
Total accepted surveys...:
MD of first survey.......:
MD of last survey........:
Page
1 of 2
15-Mar-02
19-Mar-02
9
10616.00 ft
10897.00 ft
~'
----- Geomagnetic data ----------------------
Magnetic model.. .........: BGGM version 2001
Magnetic date.. ..........: OO-Y- 0
Magnetic field strength..: -999.25 HCNT
Magnetic dec (+E/W-).. ...: -999.25 degrees
Magnetic dip..... ........: -999.25 degrees
----- MWD
Reference
Reference
Reference
Tolerance
Tolerance
Tolerance
survey Reference
G..............:
H..............:
Dip. . . . . . . . . . . . :
of G...........:
of H. . . . . . . . . . . :
of Dip.........:
Criteria ---------
1000.00 mGal
1000.00 HCNT
0.00 degrees
(+/-) 2.50 mGal
(+/-) 6.00 HCNT
(+/-) 0.45 degrees
----- Corrections ---------------------------
Magnetic dec (+E/W-).....: -57252.81 degrees
Grid convergence (+E/W-).: 0.00 degrees
Total az corr (+E/W-). ...: -57252.81 degrees
(Total az corr = magnetic dec - grid conv)
Sag applied (Y/N)........: No degree: 0.00
.~
,
ANADRILL SCHLUMBERGER Survey Report 19-Mar-2002 11:10:47 Page 2 of 2
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool
# depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool qual
(ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type type
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
-------- ------ ------- ------ -------- -------- ---------------- --------------- ------
1 10616.00 17.00 161.60 0.00 8754.72 3773.09 -4623.73 2258.79 5145.97 153.96 0.00 TIP
2 10667.95 21.70 163.85 51.95 8803.72 3783.75 -4640.17 2263.86 5162.97 153.99 9.16 MWD
3 10707.25 39.93 164.63 39.30 8837.33 3795.75 -4659.47 2269.27 5182.69 154.03 46.40 MWD
4 10764.60 63.95 165.21 57.35 8872.43 3822.20 -4702.77 2280.90 5226.71 154.13 41.89 SP
5 10774.63 67.98 162.89 10.03 8876.51 3827.72 -4711.57 2283.42 5235.73 154.14 45.34 SP
6 10794.85 75.78 156.86 20.22 8882.81 3840.39 -4729.58 2290.04 5254.83 154.16 47.86 SP
7 10821.84 80.48 150.06 26.99 8888.36 3859.90 -4753.18 2301.85 5281.21 154.16 30.16 SP
8 10857.59 80.68 143.31 35.75 8894.23 3888.57 -4782.63 2321.20 5316.16 154.11 18.64 SP -..-'
9 10897.00 80.68 143.31 39.41 8900.61 3921.49 -4813.82 2344.44 5354.37 154.03 0.00 Proj.
~
(
ö
Y-37APB1
Survey Report - Geodetic
Schlumbepuep
Report Date: 02-Apr-2002 Survey / DLS Computation Method: Minimum Curvature t Lubinski
Client: BP Exploration Alaska Vertical Section Azimuth: 111.120°
Field: Prudhoe Bay Unit - WOA (Drill Pads) Vertical Section Origin: N 0.000 ft, E 0.000 11
Structure / Slot: V-PAD / Y-37 TVD Reference Datum: MSL
Well: Y-37 TVD Reference Elevation: 0.000 ft relative to MSL
Borehole: Y-37APB1 Sea Bed / Ground Level Elevation: 50.000 ft relative to MSL
UWUAPI#: 500292240370 Magnetic Declination: +26.295°
Survey Name I Date: Y-37APB1 / March 26,2002 Total Field Strength: 57492.813 nT
Tort / AHD / DDlI ERD ratio: 194.794° /5382.44 ftt 6.108 / 0.605 Magnetic Dip: 80.765°
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4, US Feet Declination Date: March 26, 2002 ~-.--,
Location Lat/Long: N 70.26762332, W 148.83116474 Magnetic Declination Model: BGGM 2001
Location Grid NfE Y/X: N 5948825.220 ftUS, E 644540.760 ftUS North Reference: True North
Grid Convergence Angle: +1.10021858° Total Corr Mag North -) True North: +26.295°
Grid Scale Factor: 0.99992373 Local Coordinates Referenced To: Well Head
Grid Coordinates Geographic Coordinates
Station ID MD Incl Azim TVD vSec NI-S E/-W DLS Northing Easting Latitude Longitude
(ft) e) e) (ft) (ft) (ft) (ft) (0/100ft) (ftUS) (ftUS)
0.00 0.00 0.00 -79.10 0.00 0.00 0.00 5948825.22 644540.76 N 70.26762332 W 148.83116474
126.00 0.90 265.30 46.89 -0.89 -0.08 -0.99 0.71 5948825.12 644539.78 N 70.26762310 W 148.83117272
224.00 1.00 286.40 144.88 -2.44 0.10 -2.57 0.37 5948825.27 644538.19 N 70.26762358 W 148.83118555
316.00 1.40 282.20 236.86 -4.35 0.56 -4.44 0.44 5948825.70 644536.31 N 70.26762485 W 148.83120066
408.00 1.80 281 .80 328.83 -6.88 1.09 -6.96 0.43 5948826.18 644533.79 N 70.26762631 W 148.83122098
499.00 1.70 241.80 419.79 -9.17 0.75 -9.54 1.32 5948825.79 644531.20 N 70.26762536 W 148.83124191
592.00 1.90 210.10 512.74 -10.31 -1.24 -11.53 1.08 5948823.76 644529.25 N 70.26761994 W 148.83125799
685.00 2.70 171.10 605.67 -9.46 -4.74 -11.97 1.84 5948820.26 644528.89 N 70.26761038 W 148.83126150
778.00 4.20 154.90 698.50 -5.90 -9.98 -10.18 1.91 5948815.04 644530.77 N 70.26759604 W 148.831247m
872.00 4.20 133.1 0 792.26 -0.22 -15.45 -6.21 1.69 5948809.65 644534.85 N 70.26758110 W 148.83121495~
966.00 4.30 135.20 886.00 6.18 -20.31 -1.21 0.20 5948804.90 644539.94 N 70.26756785 W 148.83117455
1060.00 4.00 128.20 979.75 12.54 -24.83 3.85 0.63 5948800.47 644545.08 N 70.26755548 W 148.83113365
1154.00 4.60 122.90 1073.49 19.36 -28.91 9.59 0.76 5948796.50 644550.90 N 70.26754434 W 148.83108723
1247.00 4.50 124.30 1166.19 26.56 -32.99 15.73 0.16 5948792.54 644557.12 N 70.26753319 W 148.83103754
1341.00 4.40 121.90 1259.91 33.70 -36.97 21.84 0.22 5948788.68 644563.30 N 70.26752231 W 148.83098816
1435.00 4.20 135.20 1353.65 40.38 -41.32 27.33 1.08 5948784.43 644568.87 N 70.26751043 W 148.83094380
1528.00 4.30 153.50 1446.40 46.07 -46.86 31.28 1.46 5948778.97 644572.93 N 70.26749530 W 148.83091182
1622.00 4.20 158.80 1540.14 50.99 -53.22 34.10 0.43 5948772.67 644575.87 N 70.26747792 W 148.83088904
Y-37APB1 ASP Final Survey.xls
Page 1 of 4
4/18/2002-3:01 PM
~
Grid Coordinates Geographic Coordinates
Station ID MD Incl Azim TVD VSec NI-S EJ-W DLS Northing Easting Latitude Longitude
(ft) (°) (") (ft) (ft) (ft) (ft) (0/100ft) (ftUS) (ftUS)
1717.00 4.70 162.00 1634.85 55.78 -60.17 36.56 0.59 5948765.77 644578.47 N 70.26745895 W 148.83086914
1807.00 4.70 160.20 1724.55 60.53 -67.14 38.95 0.16 5948758.84 644580.99 N 70.26743989 W 148.83084983
1899.00 5.10 158.40 1816.21 65.77 -74.49 41.73 0.47 5948751.55 644583.91 N 70.26741981 W 148.83082734
1992.00 6.00 163.50 1908.78 71.54 -82.99 44.63 1.10 5948743.10 644586.98 N 70.26739658 W 148.83080387
2086.00 7.50 161.60 2002.12 78.44 -93.53 47.97 1.61 5948732.64 644590.51 N 70.26736781 W 148.83077694
2177.00 9.10 163.00 2092.17 86.67 -106.05 51.94 1.77 5948720.20 644594.73 N 70.26733361 W 148.83074477
2271.00 12.00 158.80 2184.57 97.84 -122.27 57.65 3.19 5948704.09 644600.74 N 70.26728929 W 148.83069861
2364.00 15.10 155.30 2274.97 113.04 -142.29 66.21 3.45 5948684.24 644609.69 N 70.26723459 W 148.83062941
2458.00 17.80 154.60 2365.12 132.25 -166.40 77.49 2.88 5948660.35 644621 .43 N 70.26716873 W 148.83053820
2553.00 20.00 155.60 2454.99 154.38 -194.31 90.44 2.34 5948632.69 644634.90 N 70.26709246 W 148.8304335'
2648.00 22.90 154.20 2543.40 179.47 -225.76 105.19 3.10 5948601.54 644650.26 N 70.26700656 W 148.83031424"'--"
2740.00 26.00 152.80 2627.14 207.62 -259.82 122.21 3.43 5948567.82 644667.92 N 70.26691352 W 148.83017670
2834.00 28.90 155.30 2710.55 239.30 -298.79 141.12 3.32 5948529.22 644687.58 N 70.26680705 W 148.83002379
2928.00 31.40 154.20 2791.83 273.48 -341.48 161.27 2.72 5948486.93 644708.55 N 70.26669042 W 148.82986086
3022.00 33.80 154.60 2871.01 310.34 -387.15 183.15 2.56 5948441.69 644731.29 N 70.26656565 W 148.82968401
3115.00 35.40 152.1 0 2947.57 349.45 -434.33 206.85 2.30 5948394.98 644755.90 N 70.26643676 W 148.82949239
3208.00 37.30 152.10 3022.4 7 391.07 -483.04 232.64 2.04 5948346.77 644782.62 N 70.26630368 W 148.82928387
3304.00 40.40 152.50 3097.22 436.38 -536.35 260.63 3.24 5948294.01 644811.62 N 70.26615802 W 148.82905765
3404.00 41.10 150.00 3172.98 486.29 -593.57 292.03 1.78 5948237.41 644844.11 N 70.26600171 W 148.82880381
3487.00 40.70 150.40 3235.72 528.47 -640.73 319.03 0.58 5948190.79 644872.01 N 70.26587288 W 148.82858548
3580.00 40.40 151.10 3306.38 575.04 -693.48 348.58 0.59 5948138.62 644902.56 N 70.26572877 W 148.82834665
3675.00 40.10 151.10 3378.89 622.07 -747.21 378.24 0.32 5948085.47 644933.25 N 70.26558196 W 148.82810685
3768.00 39.60 150.00 3450.29 668.1 0 -799.1 0 407.54 0.93 5948034.15 644963.53 N 70.26544019 W 148.82787003
3862.00 39.00 153.20 3523.04 713.38 -851.46 435.86 2.25 5947982.36 644992.85 N 70.26529716 W 148.82764112
3956.00 40.70 153.90 3595.20 757.83 -905.39 462.68 1.87 5947928.96 645020.70 N 70.26514983 W 148.82742431
4049.00 40.30 153.20 3665.92 802.41 -959.46 489.58 0.65 5947875.41 645048.63 N 70.26500209 W 148.8272068t~
4141.00 40.10 152.80 3736.19 846.62 -1012.37 516.54 0.35 5947823.03 645076.60 N 70.26485754 W 148.82698895
4236.00 39.90 152.80 3808.96 892.23 -1066.68 544.45 0.21 5947769.27 645105.55 N 70.26470916 W 148.82676333
4330.00 39.80 152.80 3881.13 937.21 -1120.26 571.98 0.11 5947716.24 645134.10 N 70.26456280 W 148.82654079
4423.00 41.00 154.60 3951.95 981.58 -1174.29 598.68 1.80 5947662.73 645161.82 N 70.26441517 W 148.82632503
4517.00 40.30 154.60 4023.27 1026.02 -1229.61 624.94 0.74 5947607.94 645189.15 N 70.26426405 W 148.82611274
4612.00 40.20 154.20 4095.78 1070.70 -1284.96 651.46 0.29 5947553.10 645216.72 N 70.26411281 W 148.82589838
4704.00 39.90 154.60 4166.20 1113.80 -1338.35 677.04 0.43 5947500.22 645243.32 N 70.26396696 W 148.82569164
4798.00 39.80 154.90 4238.37 1157.40 -1392.83 702.74 0.23 5947446.25 645270.05 N 70.26381812 W 148.82548397
4892.00 40.00 156.30 4310.48 1200.42 -1447.73 727.64 0.98 5947391.84 645296.01 N 70.26366811 W 148.82528268
Y-37APB1 ASP Final Survey.xls
Page 2 of 4
4/18/2002-3:01 PM
,¡
,
Grid Coordinates Geographic Coordinates
Station ID MD Incl Azim TVD VSec N/-S E/-W DLS Northing Easting Latitude Longitude
(ft) (") (") (ft) (ft) (ft) (ft) (0/100ft) (ftUS) (ftUS)
4985.00 42.80 156.00 4380.24 1243.88 -1503.98 752.51 3.02 5947336.09 645321.95 N 70.26351445 W 148.82508169
5079.00 42.10 156.00 4449.60 1288.84 -1561.94 778.32 0.74 5947278.64 645348.86 N 70.26335610 W 148.82487313
5172.00 41.80 156.00 4518.76 1332.89 -1618.73 803.60 0.32 5947222.34 645375.23 N 70.26320094 W 148.82466878
5268.00 43.10 156.00 4589.60 1378.80 -1677.92 829.96 1.35 5947163.67 645402.71 N 70.26303922 W 148.82445580
5362.00 42.70 156.00 4658.46 1424.14 -1736.38 855.98 0.43 5947105.73 645429.86 N 70.26287952 W 148.82424547
5455.00 43.50 156.00 4726.36 1469.17 -1794.43 881.83 0.86 5947048.19 645456.81 N 70.26272092 W 148.82403660
5550.00 44.10 156.30 4794.93 1515.64 -1854.57 908.41 0.67 5946988.58 645484.54 N 70.26255661 W 148.82382176
5645.00 44.00 156.00 4863.21 1562.32 -1914.98 935.12 0.24 5946928.70 645512.40 N 70.26239157 W 148.82360593
5739.00 43.80 156.30 4930.94 1608.38 -1974.59 961.48 0.31 5946869.61 645539.90 N 70.26222870 W 148.82339296
5834.00 44.40 157.00 4999.16 1654.69 -2035.29 987.68 0.81 5946809.43 645567.26 N 70.26206287 W 148.8231812
5927.00 44.70 156.30 5065.44 1700.40 -2095.19 1013.54 0.62 5946750.04 645594.26 N 70.26189922 W 148.8229722~
6020.00 44.20 156.70 5131.83 1746.14 -2154.91 1039.51 0.62 5946690.83 645621 .37 N 70.26173605 W 148.82276243
6115.00 43.60 155.30 5200.28 1792.82 -2215.09 1066.29 1.20 5946631.19 645649.30 N 70.26157164 W 148.82254598
6208.00 43.60 155.30 5267.63 1838.81 -2273.36 1093.09 0.00 5946573.45 645677.22 N 70.26141245 W 148.82232943
6303.00 45.30 154.90 5335.44 1886.68 -2333.69 1121.11 1.81 5946513.66 645706.38 N 70.26124759 W 148.82210308
6397.00 45.30 156.70 5401 .56 1934.19 -2394.63 1148.49 1.36 5946453.27 645734.93 N 70.26108110 W 148.82188179
6492.00 45.60 154.20 5468.21 1982.61 -2456.20 1176.62 1.90 5946392.25 645764.23 N 70.26091289 W 148.82165452
6586.00 44.90 154.60 5534.39 2031.21 -2516.40 1205.47 0.80 5946332.62 645794.23 N 70.26074841 W 148.82142145
6680.00 44.30 155.30 5601.32 2078.83 -2576.20 1233.41 0.83 5946273.38 645823.31 N 70.26058504 W 148.82119564
6775.00 44.70 154.20 5669.08 2127.02 -2636.42 1261.82 0.91 5946213.72 645852.87 N 70.26042051 W 148.82096614
6870.00 45.00 153.50 5736.43 2176.24 -2696.56 1291.35 0.61 5946154.16 645883.54 N 70.26025620 W 148.82072756
6964.00 44.60 153.50 5803.13 2225.16 -2755.83 1320.90 0.43 5946095.47 645914.23 N 70.26009425 W 148.82048877
7059.00 42.80 152.50 5871.81 2274.02 -2814.32 1350.69 2.03 5946037.58 645945.13 N 70.25993447 W 148.82024811
7153.00 42.80 152.50 5940.78 2321.94 -2870.97 1380.18 0.00 5945981.51 645975.70 N 70.25977968 W 148.82000984
7249.00 42.90 152.10 6011 .16 2371.08 -2928.77 1410.53 0.30 5945924.30 646007.15 N 70.25962175 W 148.8197646.ð
7344.00 42.90 151.80 6080.76 2420.01 -2985.84 1440.94 0.21 5945867.83 646038.65 N 70.25946582 W 148.8195189t~
7438.00 42.70 151.10 6149.73 2468.70 -3041.94 1471.46 0.55 5945812.33 646070.24 N 70.25931254 W 148.81927236
7532.00 42.70 151.40 6218.81 2517.44 -3097.83 1502.12 0.22 5945757.04 646101.97 N 70.25915984 W 148.81902464
7626.00 42.50 151.80 6288.00 2565.84 -3153.80 1532.38 0.36 5945701.67 646133.29 N 70.25900692 W 148.81878015
7720.00 42.40 151.10 6357.36 2614.20 -3209.53 1562.71 0.51 5945646.54 646164.68 N 70.25885465 W 148.81853519
7813.00 41.60 151.10 6426.47 2661.89 -3264.01 1592.78 0.86 5945592.65 646195.79 N 70.25870580 W 148.81829223
7908.00 41.10 152.50 6497.79 2709.48 -3319.32 1622.44 1.11 5945537.92 646226.50 N 70.25855469 W 148.81805262
8000.00 40.70 152.80 6567.33 2754.58 -3372.82 1650.11 0.48 5945484.97 646255.20 N 70.25840851 W 148.81782906
8092.00 40.40 152.10 6637.23 2799.49 -3425.85 1677.78 0.59 5945432.48 646283.87 N 70.25826362 W 148.81760560
8188.00 40.20 151.80 6710.45 2846.47 -3480.65 1706.97 0.29 5945378.26 646314.11 N 70.25811390 W 148.81736973
Y-37APB1 ASP Final Survey.xls
Page 3 of 4
4/18/2002-3:01 PM
Grid Coordinates Geographic Coordinates
Station ID MD Incl Azim TVD vSec NI-S EJ.W DLS Northing Easting Latitude Longitude
(ft) (") (°) (ft) (ft) (ft) (ft) (0/100ft) (ftUS) (ftUS)
8283.00 39.90 151 .80 6783.17 2892.83 -3534.52 1735.86 0.32 5945324.96 646344.03 N 70.25796670 W 148.81713639
8378.00 39.70 151 .80 6856.16 2938.94 -3588.11 1764.60 0.21 5945271 .93 646373.78 N 70.25782027 W 148.81690426
8472.00 39.50 152.80 6928.59 2984.04 -3641 .16 1792.45 0.71 5945219.43 646402.65 N 70.25767533 W 148.81667927
8566.00 39.00 152.10 7001.38 3028.70 -3693.89 1819.96 0.71 5945167.24 646431.16 N 70.25753126 W 148.81645709
8661.00 38.70 152.50 7075.36 3073.55 -3746.65 1847.66 0.41 5945115.03 646459.87 N 70.25738710 W 148.81623333
8756.00 37.60 153.20 7150.07 3117.35 -3798.87 1874.44 1.24 5945063.34 646487.64 N 70.25724443 W 148.81601700
8850.00 38.50 153.90 7224.09 3160.11 -3850.74 1900.24 1.06 5945011.98 646514.43 N 70.25710270 W 148.81580859
8945.00 38.10 154.20 7298.65 3203.22 -3903.68 1926.01 0.46 5944959.54 646541 .21 N 70.25695805 W 148.81560049
9040.00 37.80 153.50 7373.56 3246.13 -3956.12 1951.75 0.55 5944907.61 646567.96 N 70.25681476 W 148.81539254
9135.00 37.20 154.20 7448.93 3288.61 -4008.03 1977.24 0.77 5944856.20 646594.44 N 70.25667293 W 148.8151866"
9229.00 36.70 153.90 7524.05 3329.98 -4058.84 2001.97 0.57 5944805.88 646620.13 N 70.25653411 W 148.8149869'r--.-I
9323.00 36.00 153.20 7599.76 3371.1 0 -4108.73 2026.78 0.87 5944756.49 646645.89 N 70.25639781 W 148.81478656
9418.00 34.90 153.90 7677.15 3411.77 -4158.05 2051.33 1.23 5944707.64 646671 .38 N 70.25626303 W 148.81458832
9513.00 33.50 153.50 7755.72 3451.09 -4205.92 2074.98 1.49 5944660.24 646695.95 N 70.25613223 W 148.81439727
9606.00 32.20 154.90 7833.85 3487.94 -4251.33 2096.95 1.62 5944615.26 646718.78 N 70.25600816 W 148.81421989
9699.00 30.60 154.60 7913.22 3523.01 -4295.16 2117.61 1.73 5944571.85 646740.28 N 70.25588842 W 148.81405300
9794.00 29.10 156.00 7995.62 3556.93 -4338.11 2137.38 1.74 5944529.29 646760.87 N 70.25577107 W 148.81389335
9888.00 27.70 155.60 8078.30 3588.71 -4378.89 2155.70 1.50 5944488.87 646779.97 N 70.25565965 W 148.81374538
9982.00 26.40 153.90 8162.02 3619.64 -4417.55 2173.92 1.61 5944450.57 646798.93 N 70.25555400 W 148.81359824
10077.00 24.30 156.30 8247.87 3648.92 -4454.42 2191.07 2.46 5944414.04 646816.78 N 70.25545326 W 148.81345974
10169.00 21.90 157.70 8332.49 3674.06 -4487.63 2205.20 2.68 5944381.10 646831.54 N 70.25536252 W 148.81334571
10265.00 20.50 158.1 0 8421.99 3697.84 -4519.80 2218.26 1.47 5944349.20 646845.22 N 70.25527464 W 148.81324022
10360.00 19.40 157.40 8511.29 3720.09 -4549.80 2230.53 1.18 5944319.44 646858.06 N 70.25519267 W 148.81314116
10454.00 18.30 158.80 8600.24 3740.82 -4577.97 2241.86 1.27 5944291.49 646869.93 N 70.25511569 W 148.81304962
10549.00 17.30 159.50 8690.70 3760.24 -4605.11 2252.21 1.08 5944264.56 646880.79 N 70.25504155 W 148.8129661?
10616.00 17.00 161.60 8754.72 3773.09 -4623.73 2258.79 1.03 5944246.07 646887.73 N 70.25499066 W 148.8129130l~
10667.95 21.70 163.85 8803.72 3783.75 -4640.17 2263.86 9.16 5944229.73 646893.11 N 70.25494574 W 148.81287206
10707.25 39.93 164.63 8837.33 3795.75 -4659.48 2269.27 46.40 5944210.54 646898.89 N 70.25489300 W 148.81282840
10764.60 63.95 165.21 8872.43 3822.19 -4702.77 2280.89 41.89 5944167.48 646911 .35 N 70.25477472 W 148.81273457
10774.63 67.98 162.89 8876.51 3827.72 -4711.57 2283.41 45.39 5944158.72 646914.03 N 70.25475067 W 148.81271423
10794.85 75.78 156.86 8882.80 3840.39 -4729.59 2290.04 47.85 5944140.84 646921.00 N 70.25470146 W 148.81266075
10821.84 80.48 150.06 8888.36 3859.90 -4753.19 2301.84 30.18 5944117.48 646933.25 N 70.25463697 W 148.81256544
10857.59 80.68 143.31 8894.21 3888.57 -4782.64 2321.20 18.63 5944088.40 646953.17 N 70.25455649 W 148.81240908
10897.00 80.68 143.31 8900.60 3921.48 -4813.83 2344.43 0.00 5944057.67 646977.00 N 70.25447127 W 148.81222141
Y-37APB1 ASP Final Survey.xls
Page 4 of 4
4/18/2002-3:01 PM
. ,
~ I n
STATE OF ALASKA
ALASKA Oil AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
)
)
1. Operations performed: 0 Operation Shutdown 0 Stimulate
0 Pull Tubing 0 Alter Casing
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska
99519-6612
0 Plugging 0 Perforate
0 Repair Well III Other
5. Type of well:
a Development
0 Exploratory
0 Stratigraphic
0 Service
Approved 403 Requirement; Suspend Well
6. Datum Elevation (DF or KB)
KBE = 79.10'
7. Unit or Property Name
Prudhoe Bay Unit
4. Location of well at surface
1425' SNL, 276' WEL, SEC. 33, T11 N, R13E, UM
At top of productive interval
839' SNL, 1992' EWL, SEC. 03, T10N, R13E, UM
At effective depth
419' SNL, 1822' EWL, SEC. 03, T10N, R13E, UM
At total depth
1339' SNL, 3279' EWL, SEC. 03, T10N, R13E, UM
12. Present well condition summary
Total depth: measured
8. Well Number
x = 646909, Y = 5944177
Y-37A
9. Permit Number / Approval No.
202-046 302-385
10. API Number
50- 029-22403-01
11. Field and Pool
Prudhoe Bay Field I Prudhoe Bay
Pool
x = 644541, Y = 5948825
x = 646729, Y = 5944594
x = 648206, Y = 5943702
true vertical
Effective depth: measured
true vertical
12225 feet
8979 feet
9651 feet
7951 feet
Plugs (measured)
Junk (measured) Coil Tubing Cementing Assembly parted and was
cemented in the hole at about 9315' - 11450'
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
Size
Cemented MD TVD
270 sx Arcticset (Approx.) 110' 110'
1281 sx CS III, 375 sx 'G' 3372' 3228'
265 sx Class 'G' 10659' 8954'
89 sx Class 'G' 10491' - 10651' 8715' - 8867'
80' 20"
3342' 10-3/4"
1 0632' 7-5/8"
160' 5-1/2"
Perforation depth: measured
3-3/4" Uncased Hole (wI Cementing Assembly Fish): 10651' - 12225'
true vertical
8867' - 8979'
Tubing (size, grade, and measured depth)
4-1/2", 12.6#, 13CR to 10493'.
Packers and SSSV (type and measured depth) 7-5/8" x 4-1/2" Baker SABL-3 packer at 10428' and 4-1/2" Otis Landing Nipple at 2098'.
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Met Water-Bbl
Casing Pressure
Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Attachments
0 Copies of Logs and Surveys run
a Daily Report of Well Operations
17. I hereby certify that the ~eg~ing is true and correct to the ~est of my ~nOWI~ge
Signed Terrie HUbble/t) ÀJ\..Ll . ~ Title Technical Assistant
16. Status of well classifications as:
a Oil 0 Gas 0 Suspended
Service
.- ~ , ..,~ .
Date O::,z.;;t4'03
Prepared By Name/Number: Terrie Hubble, 564-4628
Submit In Duplicate
~
Form 10-404 Rev. 06/15/88
~,'
)
TREE = 4-1/16" 5M OW
WELLHEAD = 5M Frv'C
'A'ëïüÄrèYR';'''''' "''''".. "SÄ"F¿ER
'Kà:'äI:v '=""" ,.. 80:9ï
'sF:"'ä'ê.T ';''''''''''''''.''''''''''''''''''2'7~'22'i
i<OÞ;"" .. 'i1'60;
. , ..... ."..... ..."'" ". .. .. ~..........."..... ...... ...
"~x~~.~~J.~,,~~,~!_~..~~"1.,~?~:.
Datum tv[) = 10663'
Datum 1V D = 8800' SS
10-314" CSG, 45.5#, NT-80, 10 = 9.950" 1--1 3380' ~
Minimum 10 = FISH @ 9315'
2-3/8" CH EM CUT COIL TBG
I * TOP OF 2-3/8" COIL 1BG FISH, 4.45#, 1+90 1-1 9315' +/- 1
SAFETY NOTES: DURlNGY-37A SDTRKOPS, +/-
2135' OF 2-3/8" COIL TBG / BHA WAS LEFT IN
WELL AFTER COIL PARTED. TOP OFFISH @ 9315'
(CHEM CUT). BTM OFFISH @ 11450'. * SEECTD
REPORTS FOR ADDITIONAL INFO.
7-5/8" X 5-1/2" BKR PKR'HGR W/ TlEBACK l-i 10491' I
7-518" CSG, 29.7#, NT-95HS, 10 = 6.875" H 10659' --A
I 7-5/8"CSG SHOE H 10630'elm 1
1 TOP OF WHIPSTOCK H 10650' 1
1 RA PIPTAG H 10659' 1
PERFORA llON SlJv1MA. RY
RET LOG:
ANGLE AT TOP PERF:
Note: Refer to Production œ for historical perf data
SIZ E SPF INTER\! AL Opn/Sqz DATE
1 rBTD H 10976' 1
5-1/2" LNR 17#, 13-CR, ID = 4.892" H 11015'
0A.1E RBI BY CO M'v1 E3'J1S
10/31193 rvDO ORlGINALCOMPLETON
03131 A:> 2 CTDSDETRACK(ATfEIVP1)
04/02A:>2 Q-i/lP CORRECllONS
DATE REV BY
Y -37 A
8
L
....
0
I
I
:8:
~} \t
)
SAFETY NOTES: 4-1/2" TBG & 5-1/2" LNR ARE
13-CHROME WELL ANGLE> 70° @ 10780' & >
90° @ 10865'. * COIL TBG ASH IN HOLE@
9315'.SEE SAFETY BOX BB..OW FOR DETAILS.
2098' H4-1/2" OTlS SSSV NIP, 10 =3.813" 1
~ ST
7
6
5
4
3
2
1
GAS LIFT MA.NORELS
OBI TYPE VLV LATQ-i FORT OATE
37 KBMG rN BK 0 02/28/02
44 KBMG rN BK 0 02/28/02
43 KBMG rN BK 0 02/28/02
38 KBMG rN BK 0 02/28/02
24 KBMG rN BK 0 02/28/02
21 KBMG rN BK 0 02/28/02
19 KBMG rN BK 0 02/28/02
MD TVO
3222 3034
5768 4952
7685 6330
9042 7373
10056 8227
10201 8360
10306 8459
1 10373' H4-1/2" PARKER SWS NIP, D = 3,813" 1
~
1 10428'
1
1
I
1
1
H7-5/8" X4-1/2" BKRSABL-3 R<R, 10 =3.937' 1
H 4-1 /2" PARKER SWS NIP, D = 3.813" 1
H4-1/2" SWN NIP, MILL'OTO 3.80" D 1
1-14-1/2" TBG, 12,6#, 13-CR, .0152 bpf, 10 = 3.958" 1
1-14-1/2" WLEG, 10= 3,958"
l-i ELMO TT LOGGED 11/10/93 1
10459'
10477'
10492'
10493'
10463'
~
5-1/2" LNR MLLOUTWINOOW (Y -37A)
10651'- 10658' (OFFWHPSTOCK)
1 3-314" OPE3'J t-OLETO H
COMrv'ENTS
PRLDt-OEBAY LNIT
WELL: Y-37A
PffiMT t\b: 202-0460
AR No: 50-029-22403-01
SEC 33, T11 N, R13E 1425' SNL & 276' WEL
BP Exploration (Alaska)
') STATE OF ALASKA )
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVAL
Ï/J') A- J ¿.f ¡-3 / 0 1.-
~ I~l'{~
/fI'I t..- ß / ;L- / Ii?¡ / ~ ¿..
iJ0 ¡-¿119/0"(
1. Type of Request: 0 Abandon
0 Alter Casing
0 Change Approved Program
2. Name of Operator
BP Exploration (Alaska) Inc.
II Suspend 0 Plugging 0 Time Extension 0 Perforate
0 Repair Well 0 Pull Tubing 0 Variance 0 Other
0 Operation Shutdown 0 Re-Enter Suspended Well 0 Stimulate
3. Address
P.O. Box 196612, Anchorage, Alaska 99q19-6612
5. Type of well:
a Development
0 Exploratory
0 Stratigraphic
0 Service
6. Datum Elevation (DF or KB)
KBE = 79.10'
7. Unit or Property Name
Prudhoe Bay Unit
4. Location of well at surface
1425' SNL, 276' WEL, SEC. 33, T11 N, R13E, UM
At top of productive interval
8391 SNL, 1992' EWL, SEC. 03, T10N, R13E, UM
At effective depth
419' SNL, 18221 EWL, SEC. 03, T10N, R13E, UM
At total depth
1339' SNL, 32791 EWL, SEC. 03, T10N, R13E, UM
12. Present well condition summary
Total depth: measured
8. Well Number
Y-37 A
9. Permit Number
202-046
10. API Number
50- 029-22403-01
11. Field and Pool
Prudhoe Bay Field / Prudhoe
Bay Pool
true vertical
12225 feet
8979 feet
9651 feet
7951 feet
Plugs (measured)
true vertical
Effective depth: measured
Junk (measured) Coil Tubing Cementing Assembly parted and was
cemented in the hole at about 9315' - 114501 ".,,-
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
Size
Cemented
MD
TVD
801 20"
33421 10-3/4"
1 0632' 7-5/8"
160' 5-1/2"
270 sx Arcticset (Approx.)
1281 sx CS III, 375 sx 'G'
110'
3372'
110'
32281
265 sx Class IG'
89 sx Class IG'
10659' 89541
10491' - 10651' 8715' - 8867'
true vertical
None
RECEIVED
DEC 1 3 2002
Perforation depth: measured
None
Tubing (size, grade, and measured depth)
Alas1<a Oil & Gas Cons. Commission
Anchorage
Packers and SSSV (type and measured depth) 7-5/8" x 4-1/2" Baker SABL-3 packer at 10428' and 4-1/2" Otis Landing Nipple at 2098'.
4-1/2", 12.6#, 13CR to 10493'.
13. Attachments a Description Summary of Proposal
14. Estimated date for commencing operation
16. If proposal was verbally approved
0 Detailed Operations Program
15. Status of well classifications as:
a Oil 0 Gas 0 Suspended
0 BOP Sketch
Service
Name of approver Date Approved
Contact Engineer Name/Number: Alistair pherwood, 564-4378
17. I ~ereb. y certify that the forø7.. )t~ i~ ,~- and corr'f to the best of my knowledge
Signed Alistair Sherwood i ,rJr~ ( .J'~/Ù~Ua\ . Title CT Drilling Engineer
, , '.,.",','i' .,.,...". ,. ..:,'..'..'..'...'. ."'.",'i"::I,,:,,,:I~r;I,C~m~~'~i~i'~~,QijJY.:":c',:
Conditions of Approval: Notify Commission so representative may witness
Plug integrity - BOP Test - Location clearance -
/) rj".,( MechanicallntegriW Test - Subsequent form required 10- l/ 0 4- "¡
l'~# vv ft'ÆL t.~< ii O@)Ll.) I Si.<.Vta..~ r/~~.~ ~tútV1^..e~t ¡' S Wtx...l\ie..d,
Approved by order of the Commission ORIGlf\lAI i~NfQBV 1 ~ 1'. Commissioner
Form 10-403 Rev. 06/15/88 M ~: éi'''' ',:, :::i. i; . \. ,> ~1IH~ 5 M ~ l DEC ? 1
Prepared By NameINumber: Terrie Hubble, 564-4628
Date j'L- \'G ~1,. .
?~ -_jl:~-
Date 1!X1r¡1v
'.~~uþmit In ;l,:'i~licate
)
)
p
To:
Winton Aubert
Sr. Petroleum Engineer
Alaska Oil & Gas Conservation Commission
From: Alistair Sherwood
CTO Engineer
Oate: December 12th 2002
Re:
CTO Sidetrack of well V -37
Drilling Permit No. 202-046
Back in March 02, Nabors 3S / SLB Coil Tubing Unit 4 experienced severe difficulties drilling V -37a sidetrack.
The Z4 LOC reserves the sidetrack targeted lay to the East of a NW-SE, -25ft upthrown fault. After 1400ft of
drilling and with 1000' to go, the fault was intersected and circulation lost. Based on severity it was decided to
risk drilling ahead using seawater. This we did for 150' until shale sloughing, weight transfer and orientation
problems became unbearable. After pumping 120bbls of cement and 40bbls of LCM with a nozzle BHA, fluid loss
was cured. However during the operation to lay in a 7bbl cement kick off plug to sidetrack the well, the 2% coil
parted at surface.
Before moving off the well, the coil fish was drifted, chemically cut -1300' above the window and partially
recovered back to surface. Since shutting down the Nabors 3S / SLB Unit 4 CTO operation on March 31, service
coil has visited the well, with the desire the remove more of the coil fish, at least down to the window. On 1 %"
coil, a 1.69" motor & 1.85" diamond speed mill, struggled to remov~-300' of cement from inside the coil fish.
Given the cemented in nature of the fish & it's location, future recovery, as far as being able to produce the well
again is a significant challenge. There are therefore no plans to return to Y-37 with a CTO rig.
Note: the coil parted at a flat spot. A highly abrasive 13Cr 4Y2" completion and a lack of lubricating fluid, (due to
losses) caused the coil wall to wear away quickly to the point of tensile failure. /
ÆÛV~ð¡
Alistair Sherwood
CTO Drilling Engineer
1l,1{1./~'1- -
/[0 d
2..
CC:
Well File
Terrie Hubble
TREE = 4-1/16" 5M CIW
~WELLHEAD = 5M FMC
ÄëTuÄTbR~'. ...ŠÄKER
KB. ELEV = 80.9'
'BF:ELËV'~ " ,.", '2i:22ï
..............................", . ., "".... ....
KOP = 2100'
~x'~~~ì~ ~..~( (~'118~~Î'
Datum MD = 10663'
DatümlVD;" ääöo'ss
)
Y-37A
8
10-3/4" CSG, 45.5#, NT-80, ID = 9.950" 1-1 3380'
~
Minimum 10 = FISH @ 9315'
2-3/8" CHEM CUT COIL TBG
L
..,
I * TOP 0, F 2-3/8" COIL TBG FISH, 4.45#, H-90 1-1 9315' +/- ~ ~-J
I GUIDE TOOL SET ON COIL 4-1/2 GFN (WLM) 1--1 9327' r
""
SAFETY NOTES: DURING Y-37 A SDTRK OPS, +1-
2135' OF2-3/8" COIL TBGI BHA WAS LEFT IN
WELL AFTER COIL PARTED. TOP OF ASH @ 9315'
(CHEM CUT). BTM OF ASH @ 11450'. * SEE CTD
REPORTS FOR ADDITIONAL INFO.
I
I
:8:
7-5/8" X 5-1/2" BKR PKR/HGR W/ TIEBACK 1-1 10491' I
~, \r
7-5/8" CSG, 29.7#, NT-95HS, ID = 6.875" 1-1 10659' ~
I 7-5/8" CSG SHOE 1-I10630'elm 1
hvNOTES: 4-1/2" TBG& 5-1/2" LNRARE
13-CHROME. WELL ANGLE> 70° @ 10780' & >
90° @ 10865'. * COIL TBG ASH IN HOLE @
9315'. SEE SAÆTY BOX BELOW FOR DETAILS.
2098' H4-1/2" OTIS SSSV NIP, ID = 3.813" 1
~ ST
7
6
5
4
3
2
1
GAS LIFT MANDRELS
DEV ìYÆ VLV LATCH PORT DATE
37 KBMG DV BK 0 02/28/02
44 KBMG DV BK 0 02/28/02
43 KBMG DV BK 0 02/28/02
38 KBMG DV BK 0 02/28/02
24 KBMG DV BK 0 02/28/02
21 KBMG DV BK 0 02/28/02
19 KBMG DV BK 0 02/28/02
MD rvD
3222 3034
5768 4952
7685 6330
9042 7373
10056 8227
10201 8360
10306 8459
Q/POl9 t
I 10373' H4-1/2" PARKER SWS NIP, ID = 3.813" 1
~
I 10428'
I
I
I
I
I
1-17-5/8" X 4-1/2" BKRSABL-3 PKR, ID= 3.937" 1
H4-1/2" PARKER SWS NIP, ID = 3.813" 1
H4-1/2" SWN NIP, MILL'DTO 3.80" ID 1
1-14-1/2" TBG, 12.6#, 13-CR, .0152 bpf, ID = 3.958" I
1-14-1/2" WLEG, ID = 3.958" 1
1-1 ELMD TT LOGGED 11/10/93 1
10459'
10477'
10492'
10493'
10463'
~
.¡l6k
--..' ~~ 5-1/2" LNRMILLOUTWINooW (Y-37A)
10651' - 10658' (OFF WHIPSTOCK)
I TOP OF WHIPSTOCK 1-1 10650' 1
I RA PIP TAG 1-1 10659' 1
ÆRFORA TION SUMMARY
REF LOG:
ANGLE AT TOP ÆRF:
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV AL Opn/Sqz DA TE
5-1/2" LNR, 17#, 13-CR, ID = 4.892" 1-1 11015'
I PBTD 1-1 10976' 1
DATE
10/31/93
03/31/02
04/02/02
06/24/02
REV BY
MOO
COMMENTS
ORIGINAL COMPLETION
CTD SIDETRACK (ATTEMPT)
CORRECTIONS
SET GUIDE TOOL
DA TE REV BY
CH/TP
JM'KAK
I 3-3/4" OÆN HOLE TD 1-1
COMMENTS
PRUDHOE BAY UNIT
WB.L: Y -37 A
ÆRMIT No: 202-0460
API No: 50-029-22403-01
SEC 33, T11 N, R13E 1425' SNL & 276' We.
BP Exploration (Alaska)
ScblulDbepgeP
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
A TIN: Sherñe
;~
Well Job # Log Description
D.S. 7-28A 1 '17.. J d'=j 22170 RST
Y -37 A ~ ~..t)q '" 22167 SP ARC DATA
Y-37A 22167 MD VISION RESISTIVITY
Y-37A 22167 TVD VISION RESISTIVITY
Y-37A PB1 22157 SP DATA
Y-37A PB~ 22157 MD SLlMPULSE-GR
Y-37A PBI V 22157 TVD SLlMPULSE-GR
~.
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2- 1
900 E. Benson Blvd.
Anchorage, Alaska 99508
RECEIVED
Date Delivered:
t.PR 1 9 2002
Alaska Oil & Gas Cons. Commission
Anchorage
Date
03/28/02
03/25/02
03/25/02
03/25/02
03/18/02
03/18/02
03/18/02
Blueline
0£1/16/02
NO. 1992
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Aftn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Sepia
Color
Prints
CD
Schlumberger GeoQuest
39£10 Arctic Blvd. Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
ReceiVed~~¡ Å Qo.f'~
Customer
Well No
Installation/Rig
Data
Su rveys
Received By:
)
MWD/LWD Log Product Delivery
BP Exploration (Alaska) Inc.
Dispatched To:
Y-37a PB1
Date Dispatched:
Nabors 3S / SLB CTU # 4
Dispatched By:
)
Lisa Weepie
5-Apr-02
Nate Rose
No Of Prints No of Floppies
¿).Od-OL/0
2
,-- - ~, ( ,', :" /, .
¡'---~~ 6-~v-_-'
L WD Log Delivery V 1 .1 Dec '97
Please sign and return to:
Anadrill LWD Division
3940 Arctic Blvd, Suite 300
Anchorage, Alaska 99503
nrose1 @slb.com
Fax: 907-561~~¡r.1..1\/1..~.
~I
APR 11 2002
AlalkaÐil IGI& ConI.er....LrfJn
Ancimage
.)
)
MWD/LWD Log Product Delivery
Customer BP Exploration (Alaska) Inc. Dispatched To: Lisa Weepie
Well No Y-37a PB1 Date Dispatched: 1-Apr-02
Installation/Rig Nabors 3S / SLB CTU # 4 Dispatched By: Nate Rose
Data No Of Prints No of Floppies
Su rveys
2
aOa-04l,o
RECEIVED
APR
3 ?nrr)
NllklOI& 3I&Ccm. GoRIiIIion
-....
Received BY~ ~
Please sign and return to:
Anadrill LWD Division
3940 Arctic Blvd, Suite 300
Anchorage, Alaska 99503
nrose1 @slb.com
Fax: 907-561-8417
LWD Log Delivery V1.1, Dec '97
')
')
~~!Æ~E : F !Æ~!Æ~~~!Æ
AlASKA. OIL AND GAS
CONSERVATION COMMISSION
TONY KNOWLES, GOVERNOR
333 W. "pH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Alistair Sherwood
CT Drilling Engineer
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, AK. 99519-6612
Re:
Prudhoe Bay Unit Y-37A
BP Exploration (Alaska) Inc.
Permit No: 202-046
Sur Loc: 1425' SNL, 276'WEL, SEC. 33, TIIN, R13E, UM
Btmhole Loc. 1490' SNL, 4092' EWL, SEC 03, TION, R13E, UM
Dear Mr. Sherwood:
Enclosed is the approved application for permit to redrill the above referenced well.
The permit to redrlll does not exempt you from obtaining additional permits required by . law
from other governmental agencies, and does not authorize conducting drilling operations until all
other required pennitting detenninations are made.
Annular disposal has not been requested as part of the Pennit to Drill application for Prudhoe
Bay Unit Y-37A.
Blowout prevention equipment (BOPE) must be tested in accordance with 20AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Sincerely,
Úr ~U.~
c~echsli Ta~r
Chair
BY ORDER OF THE COMMISSION
DATED this 8th day of March, 2002
jjclEnclosures
cc:
Department of Fish & Game, Habitat Section wlo encl.
Department of Environmental Conservation wlo encl.
, STATE OF ALASKA
ALASKA OIl- JND GAS CONSERVATION COMMIS
PERMIT TO DRILL
20 AAC 25.005
\¡J't:¡ A 3/ q¡ f)'2-
k 3{S --()?-
)N
1 a. Type of work 0 Drill 181 Redrill
0 Re-Entry 0 Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519.6612
4. Location of well at surface
1425' SNL, 276' WEL, SEC. 33, T11 N, R13E, UM
At top of productive interval
802' SNL, 1982' EWL, SEC. 03, T10N, R13E, UM
At total depth
1490' SNL, 4092' EWL, SEC. 03, T10N, R13E, UM
12. Distance to nearest property line 13. Distance to nearest well
ADL 047472,1186' MD No Close Approach
16. To be completed for deviated wells
Kick Off Depth 10650' Maximum Hole Angle
18. Casin~ Program Specifications
Size
Hole CasinQ Weiaht Grade: Coupling
3-3/4" 3-3I16"x 2-7/8" 6.2#, 6.5# L.80 ST-L
1 b. Type of well 0 Exploratory 0 Stratigraphic Test 181 Development Oil
0 Service 0 Development Gas 181 Single Zone 0 Multiple Zone
5. Datum Elevation (DF or KB) 10. Field and Pool
KBE = 79.10' Prudhoe Bay Field / Prudhoe
6. Property Designation Bay Pool
ADL 047471
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
V -37 A
9. Approximate spud date
03/18/02 /' Amount $200,000.00
14. Number of acres in property 15. Proposed depth (MD and TVD)
2560 13088' MD / 8950' TVD
17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
97.900 Maximum surface 2245 psig, At total depth (TV D) 8800' / 3300 psig
Setting Depth
TQP Bottom Quantitv of Cement
Lenath MD TVD MD TVD (include staae data)
2688' 10400' 8541' 13088' 8950' 80 cu ft Class 'G' ./
11. Type Bond (See 20 AAC 25.025)
Number 2S100302630-277
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
11015 feet
9219 feet
10976 feet
9181 feet
Length
Plugs (measured)
Junk (measured)
Size
Cemented
MD
TVD
80' 20"
3342' 10-3/4"
1 0632' 7-5/8"
524' 5-1/2"
270 sx Arcticset (Approx.)
1281 sx CS III, 375 sx 'G'
110'
3372'
110'
3228'
265 sx Class 'G'
89 sx Class 'G'
10659' 8954'
10491' - 11015' 8715' - 9219'
RECEiVED
true vertical
Open: 10644' - 10658', 10736' - 10770'
Open: 8861' - 8874', 8949' - 8982'
FEB 2 0 2002
Perforation depth: measured
20. Attachments
Alaska Oil & G::1S Cons. Commission
II Filing Fee 0 Property Plat II BOP Sketch 0 Diverter Sketch 181 Drilli~IØ~
181 Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements
Contact Engineer NameINumber: Alistair Sherwood, 564-4378 Prepared By NameINumber: Sandra Stewman, 564-4750
21. I hereby certify that the fa. rer,tJ is t'/J a~ to the best of my knOWled. ge. I ~
Signed Alistair Sherwood 1f1411 ß.Rý) Hie CT Dnlllng Engineer Date 02..20 { ~ L
Cor;nmission. Use" Only .. ..'
Permit Number", J/ API Number Approval Date See cover letter
2D 2- -0 7 (0 50- 029-22403-01 -2J~/[) ~ for other reQuirements
Conditions of Approval: Samples Required D Yes SNo Mud Log Required D.Ves ¡ßJ' No
Hydrogen Sulfide Measures [lVes D No Directional Survey Required iifVes D NO~')~ '5'
Required Working Pressure for BÒPE D 2K D 3K D 4K D 5K D 10K D 15K ~.5K psi I y-
Other:
Approved By
Form 10-401 Rev. 12-01-85
. . . by order of
Ongmal Signed BV Commissioner the commission
Gammy Uechsli 0 RIG I N A L
- ,
Date j, ~{~3
~ubmit In Triplicate
,)
BPX
Y -37 Sidetrack
')
Summary of Operations: I
A sidetrack of production well Y -37 will be drilled using coil tubing. Specific prep work, (Phase 1) and drilling,
(Phase 2) operations are detailed below.
Phase 1: Screen & Prep Well: Screen - Fluid pack lA, install dummy GlV's and MIT-IA. PPPOT-tbg
hanger seals. MIT-OA and pressure test tree valves. Prep - Planned for March 11,2002
¡
. Set a thru tubing 4V2" x SV2" mechanical whipstock at 10,6S0' MD (8,78J TVDss).
. P&A existing perforations above & below the whipstock with a 10 bbls squeeze of 1S.8ppg cement.
Phase 2: Drill and Complete CTD sidetrack: Planned for March 18, 2002
2%" coil will be used to drill a -2240ft of 3%" OH sidetrack from a window cut in the SV2" liner - as per the
attached plan. The sidetrack will be completed, Bonsai style with a 2,690ft, solid 3-3/16" & solid/perforated
2}8" liner. The 2Ys" slotted liner will be laid across the production interval; the remaining solid, across
unproductive interval up into the parent wellbore. Cement will be placed behind the solid pipe using a float,
baffle & perforated pup joint. Drilling out of this float equipment & any cement stringers will be the final
operation.
Mud Program:
. Phase 1: Seawater
. Phase 2: Seawater and Flo-Pro (8.6 - 8.7 ppg)
Disposal:
. No annular injection on this well.
. All drilling and completion fluids and all other Class II wastes will go to Grind & Inject.
. All Class I wastes will go to Pad 3 for disposal.
Casing Program: (l1S-0' ~
. 3-3/16", l-80, liner will be run from 10,400'md (TOl, 8,S41' TVDss) to approximately ~'md, (100'
outside of the window). From 10,94S'md, 2Ys" solid liner will be run to the top of the production interval
beyond which 2~" slotted ~er will be run to TD. Assuming the diverter equipment is \þlaced at 12,300'
than approximately 14bbls, (annular volume +400/0 exceJs in the open hole) of 1S.8ppg class G cement
will be pumped behind pipe bringing the TOC to 10,SOO' in the SV2" liner.
Well Control:
. BOP diagram is attached. ./
. Pipe rams, blind rams and the CT pack off will be pressure tested to 300 psi and to 3,SOO psi.
. The annular preventer will be tested to 400 psi and 2,200 psi.
Directional
. See attached directional plan.
. Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
Logging
. Real time MWD, Gamma Ray & Resistivity logs will be run while drilling the open hole section.
Hazards
. H2S is a hazard on Y pad. last tested on the 12/13/01, Y -37 had a 70ppm concentration.
. The wells directional trajectory crosses a fault just past mid way. There is a significant risk of loosing
lost circulation.
Reservoir Pressure
Reservoir pressure is estimatrd to be 3,300 psi at 8,800ss. Maximum surface pressure with gas (0.12
psi/ft) to surface is 2,24S psi.
TREE = 4-1/16"5MCIW
WELLHEAD = 5M FMC
ÄërUATOR'; .."SÃKER
. .. .. . I
KB. ELEV = 80.9'
BF:aBï' ;''''2j~22i
Kop"; . ..., '''''' ....'21 ÖÒi
MaxA'ngië ;"' ,. , 42@ 337Sì
ÖätumMÖ ~ .., 1 0663;'
. . . . .. . . . .
Datum rvD = 8800' SS
')
10-3/4" CSG, 45.5#, NT-80, ID = 9.953" 1-1 3380'
~
Minimum ID = 3.725" @ 10477'
4-1/2" PARKER SWN NIPPLE
I TOP OF 5-1/2" LNR 1-1 10491' 1
I 4-1/2" TBG, 12.6#, 13CR, 0.0152 bpf, ID = 3.958" 1-1 10493' 1
7-5/8" CSG, 29.7#, NT-95HS, ID = 6.875" 1-1 10659' ~
ÆRFORA TION SUMMARY
REF LOG: BHCA ON 10/27/93
ANGLEATTOPÆRF: 17 @ 10644'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL Opn/Sqz DATE
3-3/8" 6 10644 - 10658' 0 10/27/93
3-3/8" 6 10736 - 10770' 0 10/27/93
Y-37
<8
L
I
I
8:
}! \ I
I PBID l-i 10976' 1 ~
5-1/2" LNR, 17#, 13CR, 0.0232 bpf, ID = 4.892" 1-1 11015' ~
DA TE REV BY COMMENTS
10/31/93 MOO ORIGINAL COMPLETION
03/01/01 SIS-QAA CONVERTED TO CANVAS
03/08/01 SIS-LG FINAL
06/25/01 RNITP CORRECTIONS
DA TE REV BY
SAFETY
')=S
2098' ~14-1/2" OTIS SSSV NIP, ID = 3.813" 1
~ ST
7
6
5
4
3
2
1
GAS LIFT MANDRELS
MD TVD DEV TYPE VLV LATCH
3222 3034 37 CAM 1" BK
5768 4952 44 CAM 1" BK
7685 6330 43 CAM 1" BK
9042 7373 38 CAM 1" BK
10056 8227 24 CAM 1" BK
10201 8360 21 CAM 1" BK
10306 8459 19 CAM 1" BK
SIZE DATE
I 10373' ~14-1/2"PARKERSWSNIP,ID=3.813" 1
~
I 10428' 1-17-5/8" x 4-1/2" BKR SABL-3 PKR, ID = 3.93" 1
I 10459' ~14-1/2" PARKER SWS NIP, ID = 3.813" 1
I 10477' ~14-1/2"PARKERSWNNIP,ID=3.725" 1
I 10493' 1-14-1/2" WLEG, ID = 3.958" 1
I 10463' 1-1 ELMD TT LOGGED 11/10/931
~
I
COMMENTS
PRUDHOE BA Y UNIT
WELL: Y -37
ÆRMfT No: 93-1360
API No: 50-029-22403-00
SEC 33, T11 N, R13E
BP Exploration (Alaska)
TREE = 4-1/16" 5M CIW
WELLHEAD = 5M FMC
ACTUA TOR ~ BAKER
.... .. . .... .... ..
KB. ELEV = 80.9'
"sF:ELBï .~'" . "",,,. . 27"?2.2ï
'KOP;" ....... ...'21öbï
'Max Angle;" '42@f337a;
Datum MD ,; .1 0663;'
Datum lVD = 8800' SS
')
10-3/4" CSG, 45.5#, NT-80, ID = 9.953" 1-1 3380' ~
Minimum ID = 3.725" @ 10477'
4-1/2" PARKER SWN NIPPLE
I TOP OF LNR 1-1 10400' 1
I TOP OF 5-1/2" LNRI-1 10491' 1
I 4-1/2" TBG, 12.6#, 13CR, 0.0152 bpf, ID = 3.958" 1-1 10493' 1
Y-37a
(I)
L
I
I
:8:
~
1 f ~I
7-5/8" CSG, 29.7#, NT-95HS, ID = 6.875" 1-1 10659' ~
Note: 1.5/8" Csg shoe @ 10,630' Loggers Depth
Whipstock set at 10,650'
Perfs sqz'd past whipstock
PERFORA TION SUMMARY
REF LOG: BHCA ON 10/27/93
ANGLE AT TOP PERF: 17 @ 10644'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERV AL Opn/Sqz DA TE
3-3/8" 6 10644 - 10658' 0 10/27/93
3-318" 6 10736 - 10770' 0 10/27/93
I PBTD 1-1 10976'
5-1/2" LNR, 17#, 13CR, 0.0232 bpf, ID = 4.892" 1-1 11015'
xxx
X X X-
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
1 X X X
~
DA TE REV BY
DA TE REV BY COMMENTS
10/31/93 MOO ORIGINAL COMPLEIlON
03/01101 SIS-QAA CONVERTED TO CANVAS
03/08/01 SIS-LG FINAL
06/25/01 RN/TP CORRECTIONS
01/29/02 AS CTD Sidetrack Proposal
COMMENTS
SAFElY
)eS
2098' 1-14-1/2" OTIS SSSV NIP, ID = 3.813" 1
~ ST
7
6
5
4
3
2
1
GAS LIFT MANDRELS
MD lVD DEV TYPE VLV LATCH
3222 3034 37 CAM 1" BK
5768 4952 44 CAM 1" BK
7685 6330 43 CAM 1" BK
9042 7373 38 CAM 1" BK
10056 8227 24 CAM 1" BK
10201 8360 21 CAM 1" BK
10306 8459 19 CAM 1" BK
SIZE DATE
I 10373' 1-14-1/2" PARKERSWS NIP, ID= 3.813" 1
I 10428' 1-17-5/8"X4-1/2"BKRSABL-3PKR,ID=3.93" 1
I 10459' 1-14-1/2"PARKERSWSNIP,ID=3.813" 1
I 10477' 1-14-1/2" PARKER SWN NIP, ID = 3.725" 1
I 10493' 1-14-1/2" WLEG, ID = 3.958" 1
I 10463' 1-1 ELMD TT LOGGED 11/10/931
~ I 10,500' 1---1 Proposed TOC 1 ,/"
I 0"150' vJt:tA
I 1j)945' 1---133/16" x 2 7/8" XO 1
. ..
----- ....- -
...-:::.""-~ -:::::-- ~
-;:::.---- ~
}.. I
\ ~.()() 13088'L--f"TMõ1
ýl..l I ~
Bonsai Completion
Solid: 3 3/16" 6.2# TC-II L-80 ID=2.8"
Solid & Slotted: 27/8" 6.5# ST-L L-80 10=2.441"
PRUDHOE BAY UNIT
WELL: Y -37
PERMIT No: 93-1360
API No: 50-029-22403-00
SEC 33, T11 N, R13E
BP Exploration (Alaska)
ö
7600 -
-
+-' -
Q)-.J
.æw
o~
0 Q)
~ >
II .8
c: CO
~~
.r::.~
"5.0
Q):::J
Qw
eõ::E
CJ ..
:e'ã>
Q)a:::
> >
Q) Q)
2w
I-
8000-
8400 -
8800 -
9200 -
i
3600
VERTICAL SECTION VIEW
Client:
Well:
Field:
BP Exploration Alaska
Y-37A (P9)
Prudhoe Bay Unit - WOA
Schlumberuer
Structure: Y-PAD
Section At: 111.12 deg
Date: February 18, 2002
~.
TJj..Jn Survey10616 MD 8755WD,
11,.00" 161.60" SZ 3773 departure:
, . -
~¡ ~~::~:1~.1~:;~~r:D
: Cry 39.61100 10670 MD BSbs TVD
~..!. 17.SS. 162.81.sz 3783departuT,.."",.¡,: e
, ,Crv 10/'100
: ! 11478MD
..i ..,..i. - ./ 90.00. 81.CJ6. az
\ I ! -~_.
~~.; ~ .".,.1 0 Y,.i ~
I ¡ /!
Y -37 I ¡ Cry 1O/'1oci
: - -. - . - CN ~W1oo 11897 MD j 8892 TVD
90" Point ! Cry 10/'100 1100:z MD 8898 TVD 9O.3IF 12p.51.-az
10855 MD 8908WD I 10872 MD 8908WD 94.~. 127.98" az 4888dep~e
90.00. 144.58" az i 94.00. 140.000 sz 402~departure '
3893 departure ! 3907 departure
Cry 101100
121SSMD 8890WD
90.60" 92.74. az
'm_.\
Cry 10/'100
Cry 101100 12895 Me 8885 TVD
12578 MD 8882 TVD 80.00. 105.39. az
=~::.\ --\
~
0
TO
13089 MD 8950 TVD
80.62" 105.39. az
8048 dep¡w1ure
----'
I
4000
i
4400
6000
I
6400
I
4800
5200 -
5600
Vertical Section Departure at 111.12 deg from (O.O, 0.0). (1 in = 400 feet)
ò
-4000 --
-4400 --
^
^
^
I
l-
e::
0
Z -4800
-5200
I
I-
::>
0
en
v
v
v -5600
-6000
Client:
Well:
Field:
Structure:
Scale:
Date:
PLAN V:IEW
BP Exploration Alaska
Y-37A (P9)
Schlumberger
Prudhoe Bay Unit - WOA
Y-PAD
1 in = 400 ft
18-Feb-2002
2000
I
2400
I
2800
,
Tie-In Survey
10616 MD 87551VD
'I ~2O:5 ~~:>~ az
Ili ~=:D6/~~7TVD ¡
i 16.66" 162.81' az ¡
! 4633 5 2262 E !
T' ,I ~;;;;::~ooJaos 1VD
/ ~-"'.. ' 17.85' 162.8,1'az
\.~ -'~-J 46395 226<Ì E
/ ,r"""'-c-"",~,; Cry 101100
,¡
~ 8908 1VD /'
47585 ~..~~az/ ~... .~- - " '-' "., ~~ J i/,.. i.', 80.00' 1.',.05.39'az
; : ~ . -<> ; ~-r~ ~- ; "'" !''',,,
~f~~~: ~~~~L~ ~-~~,r R==1 I -~7-1 ~~-~
9422" 127.e4,'az 11478MDi.,~TVD I. . I"" XI >{ /.. / i'.. 80.62' 105.39'az
48625 2438r :~ ~rEaz i crvJoo \ ! ~~ 5444S 4381E
. . , 12578UD 88621VD'; .
90.00' i 123.71' az
5242 5¡ 3932 E
I
2000
I
2400
i
2800
«< WEST
3200
I
3600
,
-4000
4000
I
4400
,
4800
True North
Mag Dee ( E 26.29° )
'"-"
~
I-propœal I
-Survey
-4400
-4800
-5200
~
-
~~
-5600
i
3200
I
3600
EAST »>
I
4000
I
4400
-6000
4800
O.I:P
----~
I
Tie-In Survey
KOP Crv 6/100
Crv 39.6/100
90° Point
Crv 10/100
Y -37 A
Proposed Well Profile - Geodetic Report
Report Date: February 18.2002 Survey / DLS Computation Method:
Client: BP Exploration Alaska Vertical Section Azimuth:
Field: Prudhoe Bay Unit - WOA (Drill Pads) dy Only Vertical Section Origin:
Structure I Slot: V-PAD / Y-37 8 818ty stu TW Reference Datum:
Well: Y-37 I
Borehole: V-37A Feaslbl Sea Bed I Ground Level Elevation:
UWIIAPI#: 500292240301 Magnetic Declination:
Survey Name / Date: Y-37 A (P9) / February 18. 2002 Total Field Strength:
Tort / AHD / DDII ERD ratio: 421.627° /7545.50 ft / 6.668/ 0.84~ Magnetic Dip:
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4, US Feel Declination Date:
Location LaULong: N 70.26762332, W 148.83116474 Magnetic Declination Model:
Location Grid NlE YfX: N 5948825.220 ftUS, E 644540.760 ftUS North Reference:
Grid Convergence Angle: +1.10021858° Total Corr Mag North -> True North:
Grid Scale Factor: 0.99992373 Local Coordinates Referenced To:
StatIon ID
IchlumbBrgBr
Minimum Curvature /Lubinski
111.120°
N 0.000 ft, E 0.000 ft
MSL
50.000 ft relative to MSL
26.286°
57493.203 n1
80.766°
April 05. 2002
BGGM 2001
True North
+26.286°
Well Head
-,.
Grid Coordinates Geographic Coordinates
MD Incl Azim TVD VSec I NI-8 El-W I DLS Northing I Easting latitude - I Longitude
(It) (°) (°) (It) (It) (It) (It) (°/1 00ft) (ftUS) (ftUS)
10616.00 17.00 161.60 8754.72 3773.09 -4623.73 2258.79 0.00 5944246.07 646887.73 N 70.25499067 W 148.81291297
10650.00 16.66 162.81 8787.26 3779.28 -4633.10 2261.79 1.44 5944236.76 646890.91 N 70.25496507 W 148.81288875
10670.00 17.85 162.81 8806.36 3782.95 -4638.77 2263.55 6.00 5944231.13 646892.78 N 70.25494958 W 148.81287454
10675.00 19.74 160.89 8811.09 3783.97 -4640.30 2264.05 39.60 5944229.61 646893.31 N 70.25494540 W 148.81287051
10700.00 29.33 154.91 8833.81 3791.14 -4649.86 2268.04 39.60 5944220.13 646897.48 N 70.25491928 W 148.81283829
10725.00 39.07 151.71 8854.47 3801.57 -4662.37 2274.39 39.60 5944207.74 646904.07 N 70.25488510 W 148.81278701
10750.00 48.86 149.63 8872.44 3814.95 -4677 .47 2282.90 39.60 5944192.81 646912.87 N 70.25484384 W 148.81271828
10775.00 58.69 148.09 8887.20 3830.89 -4694.70 2293.33 39.60 5944175.78 646923.62 N 70.25479676 W 148.81263405
10800.00 68.53 146.85 8898.30 3848.91 -4713.55 2305.37 39.60 5944157.17 646936.02 N 70.25474525 W 148.81253681
10825.00 78.37 145.77 8905.41 3868.47 -4733.47 2318.65 39.60 5944137.51 646949.68 N 70.25469082 W 148.81242955 '-'
10850.00 88.22 144.76 8908.32 3889.00 -4753.84 2332.78 39.60 5944117.42 646964.20 N 70.25463516 W 148.81231543
10854.53 90.00 144.58 8908.39 3892.77 -4757.54 2335.40 39.60 5944113.77 646966.89 N 70.25462505 W 148.81229427
10858.62 91.62 144.42 8908.34 3896.19 -4760.87 2337.78 39.60 5944110.49 646969.33 N 70.25461595 W 148.81227505
10859.18 91.62 144.42 8908.32 3896.66 -4761.33 2338.10 0.00 5944110.03 646969.66 N 70.25461469 W 148.81227246
10871.84 94.00 140.00 8907.70 3907.48 -4771.31 2345.85 39.60 5944100.20 646977.60 N 70.25458742 W 148.81220987
10875.00 94.14 140.28 8907.48 3910.24 -4773.73 2347.87 10.00 5944097.82 646979.67 N 70.25458081 W 148.81219355
10876.91 94.23 140.45 8907.34 3911.90 -4775.20 2349.08 10.00 5944096.38 646980.91 N 70.25457679 W 148.81218378
10877.36 94.23 140.45 8907.30 3912.29 -4775.55 2349.37 0.00 5944096.03 646981.20 N 70.25457583 W 148.81218143
Y-37A (P9) report.xls
Page 1 of 5
2/18/2002-2:19 PM
Grid Coordinate¡ Geographic Coordinate¡
Station 10 MO I Incl I Azim I TVD I VSec I N/oS I EI-W I OLS Northing I Easting Latitude I Longitude
(ft) (°) (°) (ft) (ft) (ft) (ft) (0/100ft) (ftUS) (ftUS)
10900.00 94.24 138.18 8905.63 3932.19 -4792.66 2364.08 10.00 5944079.21 646996.24 N 70.25452908 W 148.81206262
10925.00 94.25 135.68 8903.78 3954.63 -4810.88 2381.11 10.00 5944061.32 647013.61 N 70.25447929 W 148.81192506
10950.00 94.25 133.17 8901.93 3977.53 -4828.33 2398.91 10.00 5944044.22 647031.74 N 70.25443160 W 148.81178128
10975.00 94.24 130.66 8900.08 4000.83 -4844.98 2417.46 10.00 5944027.93 647050.61 N 70.25438610 W 148.81163144
11000.00 94.22 128.16 8898.23 4024.50 -4860.81 2436.73 10.00 5944012.47 647070.18 N 70.25434283 W 148.81147577
Crv 10/100 11001.79 94.22 127.98 8898.10 4026.21 -4861.91 2438.13 10.00 5944011.40 647071.60 N 70.25433983 W 148.81146446
11020.83 92.83 126.67 8896.93 4044.46 -4873.43 2453.24 10.00 5944000.17 647086.92 N 70.25430834 W 148.81134241
11020.95 92.83 126.67 8896.92 4044.57 -4873.50 2453.34 0.00 5944000.10 647087.03 N 70.25430815 W 148.81134160
11025.00 92.81 126.27 8896.72 4048.47 -4875.90 2456.59 10.00 5943997.77 647090.32 N 70.25430159 W 148.81131534
11050.00 92.69 123.77 8895.52 4072.71 -4890.23 2477.04 10.00 5943983.83 647111.04 N 70.25426242 W 148.81115014
11075.00 92.56 121.27 8894.38 4097.19 -4903.65 2498.10 10.00 5943970.82 647132.35 N 70.25422574 W 148.81098001 .--
11100.00 92.42 118.77 8893.29 4121.87 -4916.15 2519.72 10.00 5943958.74 647154.21 N 70.25419157 W 148.81080536
11125.00 92.29 116.27 8892.27 4146.69 -4927.69 2541.87 10.00 5943947.63 647116.õT N 70.25416003 W 148.81062642
11150.00 92.14 113.77 8891.30 4171.61 -4938.25 2564.51 10.00 5943937.50 647199.41 N 70.25413116 W 148.81044352
11175.00 92.00 111.27 8890.40 4196.58 -4947.82 2587.59 10.00 5943928.38 647222.67 N 70.25410499 W 148.81025706
11200.00 91.84 108.78 8889.56 4221.56 -4956.38 2611.06 10.00 5943920.27 647246.30 N 70.25408158 W 148.81006744
11225.00 91.69 106.28 8888.79 4246.50 -4963.90 2634.89 10.00 5943913.21 647270.26 N 70.25406102 W 148.80987492
11250.00 91.53 103.78 8888.09 4271.35 -4970.38 2659.02 10.00 5943907.20 647294.51 N 70.25404329 W 148.80967997
11275.00 91.37 101.29 8887.45 4296.06 -4975.81 2683.41 10.00 5943902.24 647319.00 N 70.25402843 W 148.80948291
11300.00 91.21 98.79 8886.89 4320.58 -4980.17 2708.02 10.00 5943898.35 647343.69 N 70.25401650 W 148.80928408
11325.00 91.04 96.30 8886.40 4344.88 -4983.45 2732.80 10.00 5943895.55 647368.52 N 70.25400751 W 148.80908387
11350.00 90.88 93.80 8885.98 4368.90 -4985.65 2757.70 10.00 5943893.83 647393.46 N 70.25400148 W 148.80888268
11375.00 90.71 91.31 8885.63 4392.59 -4986.76 2782.67 10.00 5943893.20 647418.44 N 70.25399842 W 148.80868093
11400.00 90.54 88.82 8885.36 4415.92 -4986.79 2807.66 10.00 5943893.65 647443.43 N 70.25399831 W 148.80847901
11425.00 90.36 86.32 8885.17 4438.83 -4985.73 2832.64 10.00 5943895.19 647468.38 N 70.25400118 W 148.80827717
11450.00 90.19 83.83 8885.05 4461.29 -4983.59 2857.54 10.00 5943897.80 647493.23 N 70.25400701 W 148.80807598
11475.00 90.02 81.33 8885.00 4483.25 -4980.36 2882.33 10.00 5943901.51 647517.95 N 70.25401580 W 148.80787567 -"
Crv 10/100 11477.79 90.00 81.06 8885.00 4485.67 -4979.93 2885.09 10.00 5943901.99 647520.71 N 70.25401698 W 148.80785336
11500.00 88.05 82.13 8885.38 4504.99 -4976.68 2907.06 10.00 5943905.66 647542.61 N 70.25402583 W 148.80767584
11503.56 87.74 82.30 8885.51 4508.11 -4976.20 2910.58 10.00 5943906.21 647546.12 N 70.25402714 W 148.80764740
11503.77 87.74 82.30 8885.52 4508.29 -4976.17 2910.79 0.00 5943906.24 647546.33 N 70.25402722 W 148.80764570
11525.00 87.86 84.42 8886.33 4527.06 -4973.72 2931.86 10.00 5943909.10 647567.34 N 70.25403389 W 148.80747545
11550.00 88.01 86.92 8887.23 4549.62 -4971.83 2956.77 10.00 5943911.46 647592.21 N 70.25403903 W 148.80727417
11575.00 88.16 89.41 8888.06 4572.63 -4971.03 2981.74 10.00 5943912.74 647617.16 N 70.25404119 W 148.80707241
11600.00 88.32 91.91 8888.83 4596.04 -4971.32 3006.73 10.00 5943912.93 647642.15 N 70.25404037 W 148.80687049
Y -37 A (P9) report.xls
Page 2 of 5
2/18/2002-2:19 PM
Grid Coordinates Geographic Coordinates
Station ID MD I Inel I Azim I TVD I VSec I N/-5 I EI-W I DLS Northing I fasting Latitude I Longitude
(ft) (°) (°) (ft) (ft) (ft) (ft) (0/100ft) (ftUS) (ftUS)
11625.00 88.47 94.41 8889.53 4619.81 -4972.70 3031.68 10.00 5943912.03 647667.12 N 70.25403657 W 148.80666890
11650.00 88.63 96.90 8890.17 4643.89 -4975.16 3056.54 10.00 5943910.05 647692.02 N 70.25402982 W 148.80646804
11675.00 88.79 99.40 8890.73 4668.25 -4978.70 3081.28 10.00 5943906.99 647716.82 N 70.25402012 W 148.80626816
11700.00 88.96 101.89 8891.22 4692.82 -4983.32 3105.85 10.00 5943902.84 647741.47 N 70.25400748 W 148.80606965
11725.00 89.13 104.39 8891.63 4717.57 -4989.00 3130.19 10.00 5943897.63 647765.92 N 70.25399193 W 148.80587300
11750.00 89.30 106.88 8891.98 4742.46 -4995.74 3154.26 10.00 5943891.35 647790.11 N 70.25397349 W 148.80567854
11775.00 89.47 109.38 8892.25 4767.42 -5003.52 3178.01 10.00 5943884.03 647814.00 N 70.25395221 W 148.80548667
11800.00 89.64 111.87 8892.45 4792.41 -5012.32 3201.41 10.00 5943875.68 647837.56 N 70.25392814 W 148.80529763
11825.00 89.81 114.36 8892.57 4817.40 -5022.13 3224.40 10.00 5943866.32 647860.74 N 70.25390131 W 148.80511191
11850.00 89.98 116.86 8892.61 4842.32 -5032.94 3246.94 10.00 5943855.94 647883.48 N 70.25387175 W 148.80492983
11875.00 90.15 119.35 8892.58 4867.13 -5044.72 3268.99 10.00 5943844.59 647905.75 N 70.25383955 W 148.80475171 .---
Crv 10/100 11896.63 90.30 121.51 8892.50 4888.47 -5055.67 3287.64 10.00 5943834.00 647924.60 N 70.25380961 W 148.80460105
11898.67 90.37 121.32 8892.49 4890.48 -5056.73 3289.38 10.00 5943832.97 647926.36 N 70.25380671 W 148.80458700
11899.50 90.37 121.32 8892.48 4891.30 -5057.17 3290.09 0.00 5943832.55 647927.08 N 70.25380551 W 148.80458126
11900.00 90.38 121.27 8892.48 4891.79 -5057.43 3290.52 10.00 5943832.30 647927.52 N 70.25380480 W 148.80457779
11925.00 90.40 118.77 8892.31 4916.49 -5069.93 3312.16 10.00 5943820.21 647949.39 N 70.25377062 W 148.80440299
11950.00 90.42 116.27 8892.13 4941.33 -5081.48 3334.33 10.00 5943809.09 647971.78 N 70.25373904 W 148.80422390
11975.00 90.45 113.77 8891.94 4966.27 -5092.05 3356.98 10.00 5943798.96 647994.62 N 70.25371014 W 148.80404093
12000.00 90.47 111.27 8891.74 4991.26 -5101.63 3380.07 10.00 5943789.83 648017.89 N 70.25368394 W 148.80385440
12025.00 90.49 108.77 8891.53 5016.25 -5110.19 3403.56 10.00 5943781.72 648041.54 N 70.25366052 W 148.80366464
12050.00 90.51 106.27 8891.31 5041.20 -5117.71 3427.40 10.00 5943774.66 648065.52 N 70.25363995 W 148.80347204
12075.00 90.53 103.77 8891.09 5066.05 -5124.19 3451.54 10.00 5943768.64 648089.78 N 70.25362222 W 148.80327702
12100.00 90.55 101.27 8890.85 5090.77 -5129.61 3475.94 10.00 5943763.69 648114'.27 N 70.25360738 W 148.80307989
12125.00 90.56 98.77 8890.61 5115.30 -5133.96 3500.56 10.00 5943759.82 648138.97 N 70.25359547 W 148.80288099
12150.00 90.58 96.27 8890.36 5139.59 -5137.23 3525.34 10.00 5943757.02 648163.81 N 70.25358650 W 148.80268078
12175.00 90.59 93.77 8890.11 5163.61 -5139.42 3550.24 10.00 5943755.31 648188.74 N 70.25358049 W 148.80247960
Crv 10/100 12185.29 90.60 92.74 8890.00 5173.40 -5140.00 3560.51 10.00 5943754.93 648199.02 N 70.25357889 W 148.80239663 ~
12200.00 92.07 92.75 8889.66 5187.36 -5140.70 3575.20 10.00 5943754.51 648213.72 N 70.25357696 W 148.80227794
12225.00 94.57 92.76 8888.21 5211.04 -5141.90 3600.13 10.00 5943753.79 648238.67 N 70.25357365 W 148.80207651
12250.00 97.07 92.77 8885.67 5234.65 -5143.10 3624.97 10.00 5943753.07 648263.52 N 70.25357034 W 148.80187582
12258.33 97.90 92.78 8884.59 5242.49 -5143.50 3633.22 10.00 5943752.83 648271.78 N 70.25356923 W 148.80180916
12259.19 97.90 92.78 8884.47 5243.30 -5143.55 3634.07 0.00 5943752.79 648272.63 N 70.25356909 W 148.80180229
12275.00 97.55 94.33 8882.34 5258.23 -5144.52 3649.71 10.00 5943752.12 648288.29 N 70.25356642 W 148.80167593
12300.00 96.97 96.79 8879.18 5282.12 -5146.92 3674.39 10.00 5943750.20 648313.00 N 70.25355983 W 148.80147653
12325.00 96.39 99.23 8876.27 5306.30 -5150.38 3698.97 10.00 5943747.21 648337.64 N 70.25355035 W 148.80127794
Y -37 A (P9) report.xls Page 3 of 5 2/18/2002-2:19 PM
Grid Coordinates Geographic Coordinates
Station ID MD I Inel I Azim I TVD I VSec I NJ-S I EJ.W I DLS Northing I Easting Latitude I Longitude
(ft) (°) (°) (ft) (ft) (ft) (ft) e/100ft) (ftUS) (ftUS)
12350.00 95.79 101.67 8873.62 5330.73 -5154.89 3723.42 10.00 5943743.17 648362.17 N 70.25353800 W 148.80108041
12375.00 95.18 104.11 8871.23 5355.36 -5160.44 3747.67 10.00 5943738.09 648386.52 N 70.25352280 W 148.80088450
12400.00 94.56 106.54 8869.11 5380.14 -5167.03 3771.69 10.00 5943731.96 648410.67 N 70.25350476 W 148.80069045
12425.00 93.93 108.97 8867.26 5405.02 -5174.63 3795.44 10.00 5943724.82 648434.55 N 70.25348397 W 148.80049859
12450.00 93.30 111.39 8865.68 5429.97 -5183.23 3818.85 10.00 5943716.67 648458.12 N 70.25346044 W 148.80030948
12475.00 92.66 113.81 8864.38 5454.92 -5192.83 3841.90 10.00 5943707.52 648481.35 N 70.25343418 W 148.80012328
12500.00 92.02 116.23 8863.36 5479.84 -5203.39 3864.53 10.00 5943697.39 648504.18 N 70.25340530 W 148.79994048
12525.00 91.37 118.64 8862.63 5504.68 -5214.90 3886.71 10.00 5943686.31 648526.57 N 70.25337383 W 148.79976132
12550.00 90.72 121.06 8862.17 5529.38 -5227.34 3908.39 10.00 5943674.29 648548.49 N 70.25333981 W 148.79958621
12575.00 90.07 123.4 7 8862.00 5553.91 -5240.69 3929.53 10.00 5943661.35 648569.88 N 70.25330331 W 148.79941546
Crv 10/100 12577.52 90.00 123.71 8862.00 5556.37 -5242.08 3931.63 10.00 5943660.00 648572.00 N 70.25329951 W 148.79939850 -~/
12600.00 89.99 125.96 8862.00 5578.21 -5254.92 3950.08 10.00 5943647.52 648590.70 N 70.25326441 W 148.79924948
12625.00 89.99 128.46 8862.00 5602.23 -5270.04 3969.98 10.00 5943632.79 648610.88 N 70.25322307 W 148.79908876
12635.48 89.99 129.51 8862.01 5612.20 -5276.63 3978.13 10.00 5943626.35 648619.16 N 70.25320506 W 148.79902294
12635.59 89.99 129.51 8862.01 5612.31 -5276.71 3978.22 0.00 5943626.28 648619.25 N 70.25320484 W 148.79902221
12650.00 89.42 128.19 8862.08 5626.03 -5285.74 3989.44 10.00 5943617.46 648630.64 N 70.25318015 W 148.79893160
12675.00 88.43 125.89 8862.55 5650.06 -5300.80 4009.39 10.00 5943602.79 648650.87 N 70.25313898 W 148.79877047
12700.00 87.44 123.59 8863.45 5674.34 -5315.04 4029.91 10.00 5943588.95 648671.66 N 70.25310005 W 148.79860474
12725.00 86.46 121.29 8864.79 5698.82 -5328.43 4050.98 10.00 5943575.97 648692.98 N 70.25306344 W 148.79843456
12750.00 85.48 118.98 8866.54 5723.45 -5340.95 4072.55 10.00 5943563.86 648714.79 N 70.25302920 W 148.79826034
12775.00 84.51 116.67 8868.72 5748.18 -5352.57 4094.57 10.00 5943552.67 648737.02 N 70.25299742 W 148.79808248
12800.00 83.55 114.35 8871.32 5772.97 -5363.28 4117.01 10.00 5943542.39 648759.66 N 70.25296813 W 148.79790122
12825.00 82.61 112.02 8874.33 5797.77 -5373.05 4139.82 10.00 5943533.06 648782.65 N 70.25294141 W 148.79771697
12850.00 81.67 109.68 8877.75 5822.53 -5381.86 4162.96 10.00 5943524.70 648805.96 N 70.25291730 W 148.79753005
12875.00 80.74 107.33 8881.58 5847.21 -5389.70 4186.39 10.00 5943517.31 648829.53 N 70.25289585 W 148.79734079
Crv 10/100 12895.47 80.00 105.39 8885.00 5867.32 -5395.39 4205.75 10.00 5943512.00 648849.00 N 70.25288027 W 148.79718439
12900.00 79.55 105.39 8885.80 5871.76 -5396.57 4210.05 10.00 5943510.90 648853.32 N 70.25287704 W 148.79714966 ~
12925.00 77.05 105.39 8890.87 5896.11 -5403.07 4233.65 10.00 5943504.85 648877.04 N 70.25285925 W 148.79695901
12950.00 74.55 105.39 8897.01 5920.23 -5409.50 4257.02 10.00 5943498.87 648900.52 N 70.25284165 W 148.79677022
12975.00 72.05 105.39 8904.19 5944.05 -5415.85 4280.10 10.00 5943492.97 648923.72 N 70.25282426 W 148.79658378
13000.00 69.55 105.39 8912.41 5967.54 -5422.12 4302.86 10.00 5943487.14 648946.59 N 70.25280710 W 148.79639992
13025.00 67.05 105.39 8921.66 5990.65 -5428.29 4325.25 10.00 5943481.40 648969.10 N 70.25279021 W 148.79621905
13050.00 64.55 105.39 8931.91 6013.34 -5434.34 4347.24 10.00 5943475.77 648991.20 N 70.25277365 W 148.79604141
13075.00 62.05 105.39 8943.14 6035.56 -5440.27 4368.77 10.00 5943470.26 649012.83 N 70.25275741 W 148.79586748
TO 13089.30 60.62 105.39 8950.00 6048.04 -5443.60 4380.86 10.00 5943467.16 649024.99 N 70.25274830 W 148.79576982
Y -37 A (P9) report.xls Page 4 of 5 2/18/2002-2: 19 PM
... 11/4 Turn L T Valve I
I I I Py.I~qii~rt
,"'" ......~Ii I mu Ul:f'~~~:~i~"" -"\/16"5000PSIRX-46 I
: HCR ' :I~:~~~>:'" ", ~ ÆM rn @'T': [:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:...
, .. " . . .'. . ~, :"'''I'~'''''''dl.....~.:J ~: Mil :
~ ' .l""" ,'- 'f'
~ .'. ... . ~ I Kill Line
I l,gh9,~!tb'ne. II '.~,.\" I t I
... I I I l .. ~b" :.tò~,~j~ 12 1116" 5000 psi. RX.24 I I
t¡~~t I I I \IY2'3là'~'};øW~M'1 [' :}~:~:~
~ (>.'i:'~T¿T':::~< l' . 1 ~
1 7 1/16" 6000 psi (RX-46) or
F'::"::r':'=:' "j +-- 4 1/16" 5000 psi (RX-39)
. !~~WI.III~
~ ;~1,
~ I Swab Valve I
f.-=:::'<¡::~~
.,....I.I.I.I.I.,-*Wf.~y""'\'
L~~'~'~~
'¡:¡:¡:¡:ii'III~~I~ii:¡:¡'~r.=::~~I*:::';"~"~aW,~,l,l,l,,~~m"í"ii'i1d1 ~
W~"". =
;~::~l~~:~~'}, I SSV I
'.:.J~',:",:~:
..:::...~.:~=$:tti
::~:;:"WI4;.
6~j"WfI{I1''I.:1l1i
.,.....W':""""«'.'."~"
I"~:-:-"'~::-'::~ii
~;~)¡~
~.j
.. it~~im~~1~
I:=::.:-:-~~v~;~~~ ~~J,
lI)i»ÎÌÌÌIIÎlN)'
De1i' . >.~'~~~~~t'ii:;t::~
. . ~. ;.~ :::.:: ~d'. "'''',' .'
. :". .~:~~.";;.~..~.. .~~::\.~."'
.; :.~:.:~t./. ':Y'.':;.
Well I 15-29 I
I .:. .. . .. .. ....."" ... ... .
l~i:¡:æm::B~~:::::::1
Tree Size
')
BOP-Tree
)
Rig Floor I I Ä
-. - -.. - -... -.".. - - - . . -.-
~..~
I ' .. J~II' ~'""' '111 ,'C' .
',.:,t'.:.~.:~(.Æ~~\J
KB Elevation
. . .--ij::::::::::::::::::::::::::::::::::::::::::::::~
lubricator 10 = 6.375" with 6" Otis Unions
It ~/1ô" 5000 psi BOP's. 10 = 1.06" '1
I
I
------1.'.,',"':' .,J .~11/16h 5000 psi, RX-46 I
L .... :.:~rffli:ii.'~ . ..' --.1
I
I
I
I Master Valve
I
1 tubing x 9-5/811 Annulus ~
I
. ~ ,<r\:,~,>~(, .
~'~"':-:'....x:.. :~...:--:.-:-::mJ
L~~¡~~~~', I
,:'~!';2::: .~:.~:.
I
I
19-5/811 X 13-3/811 Annulus I
I Base FlanQe
Page 1
H 204445
)
)
DATE
01/17/02
CHECK NO.
00204445
DATE
INVOICE I CREDIT MEMO
DESCRIPTION
GROSS
100.00
VENDOR
DISCOUNT
ALASKAOILA
NET
00
011602 CKOl1602L
PYMT :OMMENTS:
HANDLING INST:
100.00
Per~it to Drill ~ee
6tH - Terrie Hub11e X4628
f 37 fj
RECEiVED
FEB 2. 0 2002
Alaska Oil &: Gas :;005. Commission
And orage
IE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
TOTAL ~
100.00
100.00
BP EXPLORATION, (ALASKA) INC.
P.O. BOX 196612
ANCHORAGE, ALASKA 99519-6612
FIRST NATIONAL BANK OF ASHLAND
AN AFFILIATE OF
NATIONAL CITY BANK
CLEVELAND, OHIO
No. H 204445
CONSOLIDATED COMMERCIAL ACCOUNT
56.389
""""412
00204445
PAY
OO/100.**~********************************* US DOLLAR
To The
ORDER
Of
ALASKA OIL AND GAS
CONSERVATION COMMISSION
333.WES:t 7TH AVENUE
SUITE 100
ANCHORAGE
. DATE
0.1/17/02
AMOUNT
.$100~ 00
NOTVALlD AFTER 120 DAYS
AK 99501
.n .... ............. -~~;~~'-'--":"'jl ............
\Ç~~~f$~"~
III 2 0 .. .. .. 5 III I: 0... ~ 2 0 ~ a 11 5 I: 0 0 a ..... ~ Ii III
~
"')
')
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERlPARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME !ßt( r- '37/-1
, CHECK 1
ST ANDARD LEITER
DEVELOPMENT
DEVELOPMENT.
REDIDLL ~
EXPLORATION
INJECTION WELL
INJECTION WELL
REDRILL
CHECK WHAT APPLIES
ADD-ONS (OPTIONS)
MULTI LATERAL
(If api number last two (2)
digits are between 60-69)
PILOT HOLE (PH)
ANNULAR D~S~~L
V
ANNULAR DISPOSAL
L-> YES
ANNULAR DISPOSAL
THIS WELL'
"CLUE"
Tbe permit is for a new wellbore segment of existing well
~ Permit No, ,API No. . "
Production sbould continue to be reported as a function of
tbe original API number stated above. '
In accordance witb 20 AAC 25.005(1), all records, data and
logs acquired for tbe pilot hole must be dearly
, differentiated in both name (name on permit plus PH)
and API number (50 -70/80) from
records, data and logs acquired for wel~ (name on permit).
Annular disposal bas flot been requested. . .
Annular Disposal, of drilling wastes will not be approved. . .
Annular Disposal of drilling wastes will not be approved. . .
DISPOSAL INTO OTHER Please note tbatan disposal of fluids generated. '. .
ANNULUS
L..J YES +
SP ACING EXCEPTION
Templates are located m drive\jody\templates
Enclosed is tbe approved application for permit to drill tbe
above referenced well. Tbe permit is approved ,subject to
full compliance witb 20 AAC 25.055. Approval to peñorate
and produce is contingent upon issuance of a conservation
order approving a spacing exception.
(Company Name) will assume the liability of any protest to
tbe spacing exception tbat may occur.
WELL PERMIT CHECKLIST COMPANY ðP;<:. WE~L NAME fl3ti ~ ß 7/1 PROGRAM: Exp - Dev - Redrll ~~rv - Wellbore seg - Ann. disposal para req
FIELD & POOL ~fb / 5/ ~ INIT CLASS ~ V / ¿:J / L GEOL AREA B1{) UNIT# DI/ (¿;,Q~ ON/OFF SHORE ¿;J;1
ADMINISTRATION 1. Permit fee attached. N
2. Lease number appropri~t~.' : : : : : : : : : : : : : : : : : : .:f;;Lrf¿< ~ ¿-: ¿¿.?h~ ~(., .r/.PL-Cl2~/) ~I? p.:;/.=/' ~þ I/~ ~
3. Unique well name and number... . . . . . . . . . . . . . . . '/. Õ. ~ /1:Dl- 0 i7~71- i/
4. Well located in a defined pool.. . . . . . . . . . . . . . . . .
5. Well located proper distance from drilling unit boundary. . . .
6. Well located proper distance from other wells.. . . . . . . . .
7. Sufficient acreage available in drilling unit.. . . . . . . . . . .
8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . N
9. Operator only affected party.. . . . . . . . . . . . . . . . . . N
10. Operator has appropriate bond in force. . . . . . . . . . . . . N
11. Permit can be issued without conservation order. . . . . . . . N
A~P~R DATE., _12. Permit ca~ be issued without administrativ~ approval.. . . . . .' N
'2' z.1- 0 ~ 13. Can permit be approved before 15-day walt.. . . . . . . . . . N
GINEERING 14. Conductor string provided. . . . . . . . . . . . . . . . . . . -v-N- NIA
15. Surface casing protects all known USDWs. . . . . . . . . . . ¥-N- iC
16. CMT vol adequate to circulate on conductor & surf csg. . . . . .¥-tr
17. CMT vol adequate to tie-in long string to surf csg. . . . . . . . 'f-. N. '
18. CMT will cover all known productive horizons. . . . . . . . . . éf N A~}¡V-4.b e.~~ s. ~{.
19. Casing designs adequate for C, T, B & permafrost. . . . . . . ~ N P
~~: ~~e~~~~~I~~~~a;~g~;~;~:;~~:~d~n~~~t b~e~ ~pp~o~~d: : : '. ~ lfrPr()~( J 7,1 V { 0 L .
22. Adequate wellbore separation proposed.. . . . . . . . . . . . N
23. If diverter required, does it meet regulations. . . . . . . . . . .¥:-N-
24. Drilling fluid program schematic & equip list adequate. . . . . J N
25. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . N. .
26. BOPE press rating appropriate; test to 3500 psig. N çfdl CTU gaPE 1<'S(.
27. Choke manifold complies w/API RP-53 (May 84). . . . . . . . . N
28. Work will occur without operation shutdown. . . . . . . . . . . ~. - N. \... ....1- .
29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . ~ N ':::>..eJL ~IG<-V'
30. Permit can be issued w/o hydrogen sulfide measures. . . . . Y ~- p- 37 wæ-- I~~ 41 ;:C>y'~ ~ ~ .
31. Data presented on potential overpressure zones. . . . . . . .-~
32. Seismic analysis of shallow gas zones. . . . . . . . . . . .. í\ Y N
AP~R DATE 33. Seabed condition survey (if off-shore). . . . . . . . . .. . IV Y N
/:1 Ò z- . 2_7. D 2--34. Contact name/phone for weekly progress reports [expl atory only] Y N
ANNULAR DISPOSAL 35. With proper cementing records, this plan
(A) will contain waste in a suitable receiving zone; . . . . . . . Y N. . I -l .
(B) will not contaminate freshwater; or cause drilling waste. .. Y N tJ.o Ct,.t,A-t^- i,;lla1/ M s.. Jtr; $e-v I r-ejt' ¿,W ç 'kd .
to surface; ,
(C) will not impair mechanical integrity of the well used for disposal; Y N
(0) will not damage producing formation or impair recovery from a Y N
pool; and
(E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N
GEOLOGY: ENGINEERING: UIC/Annular: COMMISSION:
TEM m--<7fY)~S-
WG;\ffitFC
APPR DATE
'L¡.j(jA 3{Lfl OL-
ft-cy¡r¡ V5~J-
GEOLOGY
APPR DATE
(
(
Comments/Instructions:
RPC
/~
COT
DTS03( aïlG~
JMH dMl~ ~lJ{)r
G:\geology\templates\checklist.doc