Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout202-075Post Office Box 244027 Anchorage, AK 99524-4027 3800 Centerpoint Drive Suite 1400 Anchorage, AK 99503 Phone: (907) 564-4891 02/09/2024 Mr. Mel Rixse Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Re: Prudhoe Bay Surface Casing by Conductor Annulus Top-offs of Cement, Corrosion Inhibitor through 02/09/2024. Dear Mr. Rixse, Enclosed please find a copy of a spreadsheet with a list of Prudhoe Bay wells that were topped-off with cement, corrosion inhibitor in the surface casing by conductor annulus through 02/09/2024. Cement top-offs are executed as needed to mitigate the void space left at surface by minor cement fallback during the primary surface casing by conductor cement job. The remaining void space between the top of the cement and the top of the conductor is filled with a heavier than water corrosion inhibitor to reduce the risk of external surface casing corrosion. The attached spreadsheets include the well names, API and PTD numbers, treatment dates and volumes. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10-404 Report of Sundry Operations. If you have any additional questions, please contact me at 564-4891 or oliver.sternicki@hilcorp.com. Sincerely, Oliver Sternicki Well Integrity Supervisor Hilcorp North Slope, LLC Digitally signed by Oliver Sternicki DN: cn=Oliver Sternicki, c=US, o=Hilcorp North Slope LLC, ou=PBU, email=oliver.sternicki@hilcorp.com Date: 2024.02.09 11:15:58 -09'00' Oliver Sternicki Hilcorp North Slope LLC. Surface Casing by Conductor Annulus Cement, Corrosion Inhibitor Top-off Report of Sundry Operations (10-404) 02/09/2024 Well Name PTD # API # Initial top of cement (ft) Vol. of cement pumped (gal) Final top of cement (ft) Cement top off date Corrosion inhibitor (gal) Corrosion inhibitor/ sealant date L-293 223020 500292374900 30 8/29/2023 S-09A 214097 500292077101 2 9/19/2023 S-102A 223058 500292297201 2 9/19/2023 S-105A 219032 500292297701 10 9/19/2023 S-109 202245 500292313500 7 9/19/2023 S-110B 213198 500292303002 35 9/19/2023 S-113B 202143 500292309402 10 9/19/2023 S-115 202230 500292313000 4 9/19/2023 S-116A 213139 500292318301 4 9/19/2023 S-117 203012 500292313700 3 9/19/2023 S-118 203200 500292318800 9 9/19/2023 S-122 205081 500292326500 5 9/19/2023 S-125 207083 500292336100 2 9/19/2023 S-126 207097 500292336300 3 9/19/2023 S-134 209083 500292341300 35 9/19/2023 S-200A 217125 500292284601 7 9/19/2023 S-202 219120 500292364700 13 9/19/2023 S-210 219057 500292363000 10 9/19/2023 S-213A 204213 500292299301 4 9/19/2023 S-215 202154 500292310700 3 9/19/2023 S-216 200197 500292298900 4 9/19/2023 S-41A 210101 500292264501 3 9/19/2023 W-16A 203100 500292204501 2 9/23/2023 W-17A 205122 500292185601 3 9/23/2023 Well Name PTD #API # Initial top of cement (ft) Vol. of cement pumped (gal) Final top of cement (ft) Cement top off date Corrosion inhibitor (gal) Corrosion inhibitor/ sealant date W-19B 210065 500292200602 8 9/23/2023 W-21A 201111 500292192901 8 9/23/2023 W-32A 202209 500292197001 4 9/23/2023 W-201 201051 500292300700 44 9/23/2023 W-202 210133 500292343400 6 9/23/2023 W-204 206158 500292333300 3 9/23/2023 W-205 203116 500292316500 3 9/23/2023 W-207 203049 500292314500 3 9/23/2023 W-211 202075 500292308000 8 9/23/2023 W-213 207051 500292335400 3 9/23/2023 W-214 207142 500292337300 10 9/23/2023 W-215 203131 500292317200 2 9/23/2023 W-223 211006 500292344000 7 9/23/2023 Z-69 212076 500292347100 2.0 27 1.5 10/24/2023 S-128 210159 500292343600 11 12/27/2023 S-135 213202 500292350800 16 12/27/2023 V-113 202216 500292312500 24 12/31/2023 V-114A 203185 500292317801 5 12/31/2023 V-122 206147 500292332800 5 12/31/2023 V-205 206180 500292333800 2 12/31/2023 V-207 208066 500292339000 8 12/31/2023 V-214 205134 500292327500 5 12/31/2023 V-215 207041 500292335100 2 12/31/2023 V-218 207040 500292335000 5 12/31/2023 V-224 208154 500292340000 16 12/31/2023 V-225 209118 500292341900 6 12/31/2023 V-01 204090 500292321000 3 1/1/2024 V-02 204077 500292320900 5 1/1/2024 V-04 206134 500292332200 5 1/1/2024 V-102 202033 500292307000 8 1/1/2024 V-104 202142 500292310300 5 1/1/2024 V-220 208020 500292338300 4 1/1/2024 W-211 202075 500292308000 8 9/23/2023 Image )oject Well History File Cover F )e XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. c:2 Q';;¿ - 0 7...s-Well History File Identifier J ; 2 DATE7 I). ctfSI (,11. ' "0,dl-~ + 1-- i-' = TOTAL PAGES <5 ~~ I~ DATE=7/1J1()lfSI m¿) ~~~ :53 ~'J~~ PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: ¡,/ YES - NO DATE <6 , f~~1 IMP IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: Organizing (done) RESCAN 0 Two-Sided DIGITAL DATA ../ Diskettes, No.1 0 Other, Noffype 0 Color items: 0 Grayscale items: 0 Poor Quality Originals: 0 Other: NOTES: BY: BEVERLY ROBIN VINCENT SHERY~INDY Project Proofing BY: BEVERLY ROBIN VINCENT SHERY~INDY Scanning Preparation I x 30 = 30 BY: BEVERLY ROBIN VINCENT SHERY~INDY Production Scanning Stage 1 PAGE COUNT FROM SCANNED FILE: BY: BEVERLY ROBIN VINCENT SHERYlJIt';;;YINDY Stage 2 BY: BEVERLY ROBIN VINCENT SHERYL MARIA WINDY (SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAl. ATTENTION IS REOUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY . GRAYSCALE OR COLOR IMAGES) ReScanned (inrfh'idu;.11 p,l~:r' l:;p~Y:i,11 ,~t101!1i(¡n.l ",(;,.1I!!liIì9 ¡;PlI'pll~r0d) RESCANNED BY: BEVERLY ROBIN VINCENT SHERYL MARIA WINDY General Notes or Comments about this file: 0 Rescan Needed OVERSIZED (Scannable) 0 Maps: Other items scannable by large scanner 0 OVERSIZED (Non-Scannable) 0 Logs of various kinds J 0 Other DATEr jJ. ~lf-/s' WlP - YES - NO DATE: Isl DATE: ISI Quality Checked Irll)lIf~) 12/1 OI02Rev3NOTScanned. wpd e - MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marker. doc \ t~ ~L~-~~- DATA SUBMITTAL COMPLIANCE REPORT 6/1/2004 Permit to Drill 2020750 Well Name/No. PRUDHOE BAY UN POL W-211 Operator BP EXPLORATION (ALASKA) INC MD 6645-' TVD 5543/ Completion Status 1-01L -~- ----------------~ Completion Date 5/19/2002'.r-" --. - -------- -------- REQUIRED INFORMATION . --------.- Mud Log No Samples No ----. ---- DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: . ~Pdf ~ 1355 See Notes Gradiómeter Log/ Data Digital Type Med/Frmt ~g----~--- ~g : Rpt w..eg J..eg bJg- j.eQ--" CEÓ :J&9 ~óg ¿J..eg ~/ ~ D ! Log #9 ~ J,.Gg ¡ Rpt. çø(D Ag ~. - ----- - --- ------ Electr Dataset Number Name ßammaRay Pressure Log Log Run Scale Media No 5 Col 1 5 Blu 5 Blu 5 Blu 5 Blu 5 Blu 5 Blu 5 Blu 5 Col 5 Blu 5 Col 5 Blu 5 Col 5 Blu LIS' Verification Temperature Spinner Pressure Production Production Pressure ~~5 LIS Verification Gradiometèr Temperature Gamma Ray hment Evàluation Temperature Directional Survey _~ctionalsurvey ./Casing collar locåtol" 5 5 Col B!u Spinner >f ~~ {C-(;O.p ~~J. API No. 50-029-23080-00-00 Current Status 1-01L U~9-N L.--- ~ .~. Directional Survey Yes (data taken from Logs Portion of Master Well Data Maint) Interval OH/ ---- Start Stop CH Received Comments 555(L.<- 6190 Case 7/12/2002 .3200.<0. 6343 Case 7/12/2002 122 6607 Open 8/23/2002 3180 6314 Case 11/8/2002 ~-.,...-=-r 2.~ 6343 Case 7/12/2002 3180 6314 Case 11/8/2002 :11.80 6314 Case 11/8/2002 122 6645 Case 12/6/2002 Digital Well Log Data 21~Q 6314 Case 11/8/2002 3200. 6343 Case 7/12/2002 ~. 5.~§'9_~ 6190 Case 7/12/2002 122 6607 Open 8/23/2002 32Œt 6343 Case 7/12/2002 5550 6190 Case 7/12/2002 3200 6343 Case 7/12/2002 5550 .2t!3.Q Case 7/12/2002 ~ 6343 Case 7/12/2002 0 6645 Open 6/18/2002 0 6645 Open 6/18/2002 ~550 6190 Case 7/12/2002 3180 6314 Case 11/8/2002 DATA SUBMITTAL COMPLIANCE REPORT 6/1/2004 Permit to Drill 2020750 Well Name/No. PRUDHOE BAY UN POL W-211 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23080-00-00 MD 6645 TVD 5543 Completion Date 5/19/2002 Completion Status 1-01L Current Status 1-01L UIC N Well Cores/Samples Information: Name Interval Start Stop Sent Received Sample Set Number Comments Well Cored? ADDITIONAL INFORMATION Y/~ Daily History Received? (yyN (9N >-- Chips Received? ..~ Formation Tops Analysis Received? ~ .- -- --- --- -~- ---------- - - - ------~~ Comments: --~--~._-~ )~ Date: 3òJ~ ~ \..{ ---~------ - Compliance Reviewed By: '-' 876' FNL, 1443' FEL, Sec. 21, T11 N, R12E, UM At top of productive interval 2420' FNL,4071'FEL,Sec.22, T11N, R12E, UM At effective depth 2486' FNL,3965'FEL,Sec.22,T11N, R12E, UM At total depth 2502' FNL,3938'FEL, Sec. 22, T11N, R12E, UM 12. Present well condition summary Total depth: measured true vertical 1. Operations performed: ACID STIMULATION 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 4. Location of well at surface Effective depth: measured true vertical Casing Conductor Length 110' 2924' Surface Intermediate 6600' ) ) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Operation shutdown- Pull tubing - Stimulate _X Alter casing - 5. Type of Well: Development _X Plugging - Perforate - Repair well - Other - 6. Datum elevation (DF or KB feet) RKB 85 feet 7. Unit or Property name Exploratory- Stratigraphic- Service- Prudhoe Bay Unit 8. Well number (asp's 611790, 5959377) W-211 , 9. Permit number / approval number (asp's 614469, 5957873) ~ 202-075 "'., 1 O. API number " (asp's 614575, 5957809) 50-029-23080-00 11. Field / Pool Prudhoe Bay Field / Polaris Pool (asp's 614603, 5957793) 6645 feet 5543 feet Plugs (measured) 6520 feet 5422 feet Junk (measured) Fish - RHC Plug Body @ 6520' (05/19/2002) Size Cemented Measured Depth True Vertical Depth 20" x 34" 260 sx AS (Approx) 145' 145' 9-5/8" 596 sx AS Lite III, 203 sx 2959' 2660' Class 'G' 7" 399 sx Class 'G' 6631' 5529' Perforation depth: measured Open Perfs 6150'-6160', 6280'-6310', 6350'-6355' RECEIV.ED JAN J:¡ gOQ:j ,~~ê§Nâ @t! ~Jg.~.: g.O~..I:t.~. .ÜtHTIfwa8'(jt~ 3-1/2" 9.3# L-80 ~!iH~'~Miè'J"-.' "",",W"'"J ¡JI..'-",J'~! true vertical Open Perfs 5067'-5076', 5191'-5210', 5258'-5263' Tubing (size, grade, and measured depth) 4-1/2" 12.6# L-80 @ 70' MD. 4-1/2" x 3-1/2" XO @ 70'. Packers & SSSV (type & measured depth) 7" x 3-1/2" Baker S-3 Packer @ 5558' MD. 3-1/2" HES 'X' Nipple @ 2208'. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Daily AveraQe Production or Injection Data Oil-Bbl Gas-Met Water-Bbl 291 456 449 Subsequent to operation 12/15/2002 15. Attachments Copies of Logs and Surveys run - Daily Report of Well Operations - Oil _X Gas - 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Aj!~ -6iL J~ Hie: Techn;ca:Ass;stant DeWayne R. Schnorr Prior to well operation 11/25/2002 Form 10-404 Rev 06/15/88 . CasinQ Pressure TubinQ Pressure 300 295 241 545 16. Status of well classification as: 366 Suspended - Service Date January 07, 2003 Prepared by DeWayne R, Schnorr 564-5174 "' 1 '1 ~4 S B F L SUBMIT IN DUPLICATE ~ FER 3 ) ) W-211 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 1 0/21/2002 10/22/2002 10/25/2002 11/19/2002 11/19/2002 11/21/2002 12/10/2002 12/11/2002 12/12/2002 12/15/2002 PPROF: DRIFT/TAG PPROF: PRODUCTION PROFILE HOT OIL TBG WASH: ACID TREATMENT TUBING WASH/PICKLE: AC-MONITOR TUBING WASH/PICKLE: AC-EVAL; AC-TIFL TUBING WASH/PICKLE: AC-MONITOR TUBING WASH/PICKLE: TUBING WASH / PICKLE TUBING WASH/PICKLE: TUBING WASH / PICKLE TUBING WASH/PICKLE: TUBING WASH / PICKLE TESTEVENT --- BOPD: 241, BWPD: 366, MCFPD: 3,565, AL Rate: 3,020 EVENT SUMMARY 10/21/02 (WELL FLOWING ON ARRIVAL). DRIFT W/ 2.511 CENT, TEL & BAILER TO 6337' CORR. DEPTH. ( TARGET DEPTH 6330'). RECIEVE SAMPLE OF FORMATION SAND & CARBOLlTE. BOTTOM OPEN PERFS AT 63501.13' FILL IN PERFS. «< RETURN WELL TO OPERATOR TO POP »> 10/22/02 PERFORMED PPROF LOG FROM TO (63161) TO 61001. LOGGED UP PASSES AT 20,40,60,80,100,120,140,160 & 180 FPM, DOWN PASS @ 180 FPM (UNABLE TO LOG DOWN AT SLOWER SPEEDS). STOP COUNTS TAKEN AT 63061,6200' & 61001. LOGGED UP GAS LIFT SURVEY FROM 5600' TO 31801. GLM #1 @ 5473' IS ONLY VALVE LIFTING. 10/25/02 T/I/O = 300/1150/140, TEMP=60, PULL 1 GALLON SAMPLE FOR ACID STIMULATION AND DELIVERED TO DOWELL LAB. 11/19/02 T/I/O=280/1200/150. MONITOR WHP's. (PREP FOR TIFL). 11/19/02 TIO=280/1200/120 55? TIFL PASSED PRE-ACID STIM. SI WELL STACKED OUT TBG. INITIAL IA FL @ 54731 STATION #1 (127 BBLS). BLED IA FROM 1320 PSI TO 240 PSI IN 2 HOURS. IA FL REMAINED UNCHANGED, MONITORED FOR 30 MINUTES. FINAL WHPs = 1280/240/0 «< NOTIFIE FO, FO WILL POP »> 11/21/02 T/I/O=0/1680/710 MONITOR WHPs POSTTIFL (00:05). 12/11/02 CTU #5, ACID TREATMENT. RIH WITH BAKER 2-1/811 RETRIEVABLE PACKER. DROPPED 1/211 BALL AND SEAT PACKER (GOOD INDICATION) SET DOWN 2000#. CALLED TO LOAD OUT ACID (6 HOURS). RU DS PUMPS. CONDUCT PJSM AND HAZ 10. PUMPING ACID TREATMENT AS PER PROGRAM. 12/12/02 CTU #5, ACID TREATMENT. PUMPED 711 BBLS 5% DAD ACID PER PROGRAM. POOH. RECOVERED ALL BHA. «< WELL LEFT SHUT-IN, APC TO FLOWBACK ACID »> Page 1 ) ') W-211 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 12/15/02 TESTEVENT --- BOPD: 241, BWPD: 366, MCFPD: 3,565, AL Rate: 3,020. BBLS 1 84 5 273 711 1074 FLUIDS PUMPED PRESSURE TEST LUBRICATOR WI 1 BBL OF DIESEL, (1 TEST) 60/40 METHANOL WATER DIESEL 3% KCL WATER 50/0 DAD ACID TOTAL Page 2 ) WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 September 17, 2002 'vJ RE: MWD Formation Evaluation Logs: ~211 POLARIS, AK-MW-22064 0 ~ )-211 Polaris: Digital Log Images: 50-029-23080-00 1 CD Rom c7{ Oa~, °?5 I ( 355 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL LETTEll TO THE ATTENTION OF: Speny-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd, Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date: Sign~~ R' c:Ct=\\¡~C~ \l ~ "¡:,...-.~ ~ ~ 1ïl \oJ'"}.~ (":. r\ 'Î ,) DEC 06 iJ.J\;L. t.\ J.. O. '\ &' r::...,,' ('G'¡~'(:; Cc. 'mmission .M-Ias,,8' ,', vQ;:) v...,... . .AnchCf8ge 11/07/02 Schlumberger NO. 2547 Alaska Data and Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth Company: Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job# Log Description Field: Polaris Date Color Sepia BL CD 10/22/02 1 '-' W-211 ~~-OÎ~ PRODUCTION PROFILE -- PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E Benson Blvd. Anchorage AK 99508-4254 RECE\VED NOV 08 2002. Schlumberger DCS 3940 Arctic Blvd Suite 300 Anchorage AK 99503-5789 :~:.~~ Date Delivered: Alaska Q¡i & Gas Cons. Couøui~ AnchŒ8Q8 ) ) aoa-075 10915 WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska August 14, 2002 RE: MWD Formation Evaluation Logs W-211, AK-MW-22064 1 LDWG formatted Disc with verification listing. API#: 50-029-23080-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANS MITT AL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro- Technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date: Signed~éJ10rJ RECEIV€D /: ! 1",\ <") !-, v (J C. -;0 '"' AJilIk' ",I c.'OO2 B ()j/ & GaS "A- Anch;; C°111n1iaðton Schlumberger Alaska Data and Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie Well Job# Log Description W-211 W-211 dn~-{)Î t;; 22306 SCMT PRODUCTION PROFILE 07 III /02 NO. 2213 Company: Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Polaris Date Color Sepia BL CD OS/22/02 2 07/04/02 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-l 900 E Benson Blvd. Anchorage AK 99508-4254 Date Delivered: RECEIVED JUL 1 2 2002 AlaskaOíl & Gas Cons. CommÎMù\r Anchorage IINIU I .~ ~ Schlumberger Des 3940 Arctic Blvd Suite 300 Anchorage AK 99503-5789 ATTN: Sherrie ReceiV~ Ú OOo~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG ) ) 1. Status of Well iI Oil 0 Gas 0 Suspended 0 Abandoned 0 Service 2. Name of Operator BP Exploration (Alaska) Inc. 3.' Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface Jç~ : 44041 NSL, 1444' WEL, SEC. 21, T11 N, R12E, UM;; :,', ~":~", , At top of productive interval . s) ~"7 28591 NSL, 1209' EWL, SEC. 22, T11 N, R12E, UM .í",-.4;¡;'ar¿ 2~i~~k~~~~42' EWL, SEC. 22, T11N, R12E, UM l.~~¿": \.""~~'",1.1"1'1. .r~,. , 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. RKB = 84.92' ADL 028263 12. Date Spudded 13. Date T.D. Reached 14. Date Camp., Susp., or Aband. 4/14/2002 4/18/2002 5/19/2002 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 6645 5543 FT 6400 5306 FT iI Yes 0 No 22. Type Electric or Other Logs Run MWD, GR, RES, SLD/CDN, CN~ DEN, SCMT 23. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE Top BOTTOM SIZE CEMENTING RECORD 20" 91.5# H-40 Surface 110' 30" 260 sx Arctic Set (Approx.) 9-5/8" 40# L-80 351 2959' 12-1/4" 596 sx AS Lite III, 203 sx Class IG1 7" 26# L-80 31' 6631' 8-3/4" 399 sx Class IG' Classification of Service Well 7. Permit Number 202-075 8. API Number 50- 029-23080-00 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number W-211 11. Field and Pool Prudhoe Bay Field / Polaris Pool (Undefined) 15. Water depth, if offshore 16. No. of Completions N/ A MSL One 20. Depth where SSSV set 21. Thickness of Permafrost (Nipple) 22081 MD 1900' (Approx.) AMOUNT PUllED 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 2-1/2" Gun Diameter, 4 SPF MD TVD 25. SIZE 3-1/2", 9.3#, N-80 TUBING RECORD DEPTH SET (MD) 5616' PACKER SET (MD) 5558' MD TVD 6150' - 6160' 6280' - 6310' 6350' - 6355' 5067' - 5076' 5191' - 5210' 5258' - 5263' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 6280' - 6355' Frac'd; Placed 95,900#'s of 16/20 Proppant behind pipe 6150' - 6160' Frac'd; Placed 139,000#'s of 16/20 Proppant behind pipe Freeze Protected with 50 Bbls of Methonal 27. Date First Production May 28, 2002 Date of Test Hours Tested 6/25/2002 4 Flow Tubing Casing Pressure Press. PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) Gas Lift PRODUCTION FOR Oll-BBl TEST PERIOD 1849 CALCULATED 24-HoUR RATE Oll-BBl GAs-McF 358 GAs-McF WATER-BBl 0 WATER-BBl CHOKE SIZE 1790 all GRAVITY-API (CORR) GAS-all RATIO 194 28. CORE DATA D Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. sutR.t ~rf1!P~ \1 E No core samples were taken. Jl '~1 r\ 8 lìO"''J . U:\~ L' t.. IU[ Alaska Oil & Gas Gons. t,;ommlSSlon Anchorage Form 10-407 Rev. 07-01-80 0 R ¡ G ¡ ¡\Jf\ LRBDMS BFL Jl!) 2 20028ubmit In Duplicate G, F ) 29. Geologic Markers Marker Name Measured True Vertical Depth Depth Top of Ugnu 4056' 3439' Schrader Bluff M 5659' 4626' Schrader Bluff N 5909' 4841' Schrader 81 uff OA 6086' 5006' DBa 6139' 50561 OBb 6179' 5094' OBc 62141 51281 OBd 6269' 5180' OBe 6345' 5253' OBf 6391' 529T Base Schrader Bluff 6436' 5341' 31. List of Attachments: ) 30. Formation Tests Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. f) E~.. C'" :¡"" n t'( \,q, I ".", t [1 t [) J'!J!f\! !) f»). <ionr) ',- \ ¡ 'I L,., \.. L 1,. I." Alaska Oil & Gas Gons. LOUHWSSlon Anchorage Summary of Daily Drilling Reports and Post Rig Work, Surveys 32. I ~erebY certify that the f%ing ~s true a~d correct to the best of my knowledge Signed Terrie Hubble ---1£7 MLR. r ~ Title Technical Assistant W-211 202-075 Well Number Permit No. / Approval No. INSTRUCTIONS Date O~'~7rO~ Prepared By Name/Number: Sondra Stewman, 564-4750 GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stag.e cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 i-J U " , Legal Name: W-211 Common Name: W-211 Test Date 4/17/2002 Test Type FIT BP-E*RLORA'"EIQN '..~ ;.:':.. . '" , ' , . Leii'k~Øff-:..T~$J'......S.JJ.Q11:IJ.~tY. Test Depth (TMD) 2,990.0 (ft) Test DepttlfTVD) 2,660.0 (ft) AMW 9.30 (ppg) SilrfacèPreSsure 445 (psi) LèaKOffPrijssure(aHP) 1,730 (psi) Page 1 of 1 ,EMW 12.52 (ppg) ~ .~I Printed: 4122/2002 11 :43:03 AM ) ) 'BP EXPLORATION . QperatioQS SumrparyRepo:~ Page 1..of$ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: W-211 W-211 DRILL +COMPLETE DOYON DOYON 14 Start: 4/14/2002 Rig Release: 4/20/2002 Rig Number: Spud Date: 4/14/2002 End: 4/20/2002 Date From - To Hours Activity Code NPT Phase Descriptiön Of Operations 4/14/2002 00:00 - 00:30 0.50 MOB P PRE Cantilever derrick to move position 00:30 - 03:00 2.50 MOB P PRE Move rig from W 212i to W 211 03:00 - 04:00 1.00 RIGU P PRE Spot rig, level rig, cantilever derrick to drill position 04:00 - 05:00 1.00 RIGU P PRE Rig up floor, check all valves in mud system Rig accepted at 05:00 hrs, April 14, 2002 05:00 - 08:00 3.00 RIGU P PRE P/U, M/U diverter and diverter line. Take on spud mud. 08:00 - 10:00 2.00 DRILL P SURF P/U, M/U HWDP, stand in derrick, MIU bit 10:00 - 10:30 0.50 DRILL P SURF Function test diverter, koomey unit, AOGCC waived witness Pre spud meeting, fill wellbore and surface lines, no leaks 10:30 - 11 :00 0.50 DRILL P SURF Rotary drill ice from 35' to 110', formation from 110' to 200' 11 :00 - 14:00 3.00 DRILL P SURF POOH, LD rotary BHA, P/U, MIU, directional BHA 14:00 - 14:30 0.50 DRILL P SURF Shallow test MWD 14:30 - 00:00 9.50 DRILL P SURF Directional drill 12 1/4" surface wellbore from 200' to 1216' At 1018', drilled approx 3' of wood, large quanity at shakers AST 4.5, ART 2.25, ADT 6.75 4/15/2002 00:00 - 10:00 10.00 DRILL P SURF Directional drill 12 1/4" surface wellbore from 1216' to 2121' AST 4.7, ART 3.58, ADT 8.28 10:00 - 10:30 0.50 DRILL P SURF Circulate low vis sweep, bottoms up, flow check 10:30 -11:30 1.00 DRILL P SURF Wiper trip from 2121' to 600' Wellbore in good condition 11 :30 - 16:30 5.00 DRILL P SURF Directional drill wellbore from 2121' to 2970', CP TO AST 0.81, ART 2.04, ADT 2.85 16:30 - 17:30 1.00 DRILL P SURF Circulate low vis sweep, bottoms up, flow check 17:30 - 19:30 2.00 DRILL P SURF Wiper trip from 2970' to 690' Wellbore in good condition 19:30 - 21 :00 1.50 DRILL P SURF Circulate bottoms up, slight increase in cuttings at shaker, Circulate untill shakers clean 21 :00 - 21 :30 0.50 DRILL P SURF Drop ESS tool for JORPS, flow check, pump dry job 21 :30 - 22:30 1.00 DRILL P SURF Trip out to HWDP, wellbore in good condition 22:30 - 00:00 1.50 DRILL P SURF Rack back HWDP, flush tools, pull ESS, pull MWD probe, rack back NMDCs, LD directional BHA, motor, bit 4/16/2002 00:00 - 01 :00 1.00 DRILL P SURF LD BHA. Clear rig floor. 01 :00 - 02:30 1.50 CASE P SURF RU to run casing. 02:30 - 06:00 3.50 CASE P SURF Run 95/8",40 #, L-80, BTC casing. PU=165K, SO= 125K. 06:00 - 06:30 0.50 CASE P SURF MU hanger and landing joint. Wash to bottom. No fill. 06:30 - 08:30 2.00 CASE P SURF CBU. LD Franks tool and MU cement head. Circulate and condition mud. 08:30 - 11 :00 2.50 CASE P SURF Pump 5 bbls CW-100. Test lines to 3,500 psi. Pump 5 bbls CW-100, 75 bbls 10.2 ppg mud push spacer, 455 bbls 10.7 ppg Arctic set lite, 42 bbls 15.8 ppg tail cement. Displace with rig pumps at 9 bpm. Bump plug. Check floats, OK. 11 :00 - 12:00 1.00 CASE P SURF RD cement head and landing joint. 12:00 - 13:30 1.50 CASE P SURF Clear rig floor. LD casing and cementing equipment. Change bails. 13:30 -14:30 1.00 CASE P SURF Ru stack washer and flush Hydril. RD diverter line. 14:30 - 15:30 1.00 CASE P SURF RD Hydril and diverter line. 15:30 - 16:30 1.00 CASE P SURF Dress casing hanger. Install FMC SSH and test same to 1,000 psi for 10 minutes. Printed: 4/22/2002 11 :43:09 AM ) ') ,~p EXR~O~TI9N . Qp.erationsSl.Im'mary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date W-211 W-211 DRILL +COMPLETE DOYON DOYON 14 4/16/2002 4/17/2002 4/18/2002 4/19/2002 From.~ To. Hours Activity Code NPT Phäse 16:30 - 18:30 2.00 CASE P SURF 18:30 - 19:30 1.00 CASE P SURF 19:30 - 22:30 3.00 CASE P SURF 22:30 - 23:00 0.50 CASE P SURF 23:00 - 23:30 0.50 CASE P SURF 23:30 - 00:00 0.50 CASE P SURF 00:00 - 02:30 2.50 DRILL P PROD1 02:30 - 06:00 3.50 DRILL P PROD1 06:00 - 08:30 2.50 DRILL P PROD1 08:30 - 09:30 1.00 DRILL P PROD1 09:30 - 10:00 0.50 DRILL P PROD1 10:00 - 11 :00 1.00 DRILL P PROD1 11 :00 - 11 :30 0.50 DRILL P PROD1 11 :30 - 17:30 6.00 DRILL P PROD1 17:30 - 18:30 1.00 DRILL P PROD1 18:30 - 21 :30 3.00 DRILL P PROD1 21 :30 - 00:00 2.50 DRILL P PROD1 00:00 - 06:00 6.00 DRILL P PROD1 06:00 - 07:00 1.00 DRILL P PROD1 07:00 - 09:00 2.00 DRILL P PROD1 09:00 - 21 :00 12.00 DRILL P PROD1 21 :00 - 21 :30 0.50 DRILL P PROD1 21 :30 - 23:00 1.50 DRILL P PROD1 23:00 - 00:00 1.00 DRILL P PROD1 00:00 - 01 :00 1.00 DRILL P PROD1 01 :00 - 04:30 3.50 DRILL P PROD1 04:30 - 07:30 3.00 DRILL P PROD1 07:30 - 08:00 0.50 DRILL P PROD1 08:00 - 09:00 1.00 CASE P COMP 09:00 - 16:30 7.50 CASE P COMP 16:30 - 17:30 1.00 CASE P COMP 17:30 - 18:30 1.00 CASE P COMP 18:30 - 19:30 1.00 CASE P COMP 19:30 - 21 :00 1.50 CASE P COMP 21 :00 - 21 :30 21 :30 - 22:30 0.50 CASE P 1.00 CASE P COMP COMP Start: 4/14/2002 Rig Release: 4/20/2002 Rig Number: Spud Date: 4/14/2002 End: 4/20/2002 Description of Operations NU BOPE. Take RKB measurements. Install test plug. RU to test BOPE. Test BOPE to 250 / 3,500 psi as per BP policy and AOGCC regulations. Witness of test waived by John Crisp of AOGCC. LD testing equipment. Blow down choke. Pull test plug. Install wear ring. Test casing to 3,000 psi to verify port collar is closed. PU BHA from outside. PU 51 joints of 5" DP and rack in derrick. PU BHA. MU and orient motor to MWD. Upload MWD and flow test. Load RA source. Single in hole. Rotate past port collar and test casing to verify port collar is closed. RIH to float collar. Slip and cut drilling line. Test casing to 3,500 psi for 30 minutes. Drill float equipment and cement from 2,870' to 2,957'. Displace to 9.3 ppg LSND mud on the fly. Drill 20' of new formation to 2,990'. Circulate and condition mud. Perform FIT test to 12.5 ppg EMW. Drill from 2,990' to 4,076'. Circulate sweep surface to surface. Flow check. Well static. Wiper trip from 4,076' to 2,950'. Hole tight. RIH. Hit ledge at 3,160'. Ream through. RIH. Drill from 4,076' to 4,512'. Daily drilling hours: AST=.62, ART=3.58. Drill from 4,512' to 5,513'. Circulate bottoms up with sweep. Wiper trip to 9 5/8" casing shoe. RIH. Hole in good condition. Drill from 5,513' to TD at 6,645'. Circulate sweep out of hole. Survey. SPRs. Flow check. Well static. Wiper trip from 6,645' to 5,350'. RIH. Hole in good conditon. Circulate two sweeps surface to surface. CBU with sweep. Drop Sperry Sun ESS. Pump dry job. Flow check. Well static. POH. Rack back 40 stands of DP. LD remaining DP. Flow check. Well static. LD HWDP and DCs. Remove RA source. Down load MWD. LD MWD, motor, and bit. Pull wear ring. Clear rig floor. RU to run 7" casing. Run 7", 26#, L-80, BTCM casing to 6,631'. Reciprocate casing while CBU. MU cement head. Circulate hole clean and batch mix cement. Pump 5 bbls CW-100. Test lines to 3,500 psi. Pump remaining 35 bbls CW-100, 40 bbls 10.6 ppg mud push spacer, 82.5 bbls 15.8 ppg class G cement. Switch to rig pump. Displace with seawater. Reciprocate casing until 30 bbls left in displacement. Bump plug on calculated strokes. Check floats, OK. CIP 20:55. LD landing joint and cement head. Install packott. Energize and test to 5,000 psi for 10 minutes. Printed: 4/22/2002 11 :43:09 AM ) ) BP EXPL:O RATIO N" - ' 0 pè;r~.ti:Ø'"s$ UI1J mary,Re:"pårt , Page 3 of 3 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: W-211 W-211 DRILL +COMPLETE DOYON DOYON 14 Start: 4/14/2002 Rig Release: 4/20/2002 Rig Number: Spud Date: 4/14/2002 End: 4/20/2002 Date From-To- Hours Activity Code NPT Phase Descriþtionof Operc¡tions 4/19/2002 22:30 - 23:30 1.00 CASE P COMP LD casing equipment and clear floor. 23:30 - 00:00 0.50 RUNCOIVP COMP RU slickline. 4/20/2002 00:00 - 03:00 3.00 RUNCOIVP COMP RU slickline. RIH with 6" gauge ring and junk basket to 6,549' WLM. RD slickline. 03:00 - 03:30 0.50 RUNCOIVP COMP RU to run tubing. 03:30 - 10:00 6.50 RUNCOIVP COMP Run completion. 171 joints 31/2",9.3#, L-80, EUE 8rnd tubing, 3 GLMs, 1 sliding sleeve, 3 'X' nipples. 10:00 - 11 :00 1.00 RUNCOIVP COMP MU tubing hanger and landing joint. PU=95K, SO=80K. Land tubing. RILDS. RU test manifold. 11 :00 - 12:30 1.50 RUNCOIVP COMP Reverse circulate seawater until clean returns then circulate corrosion inhibited seawater. 12:30 - 14:00 1.50 RUNCOIVP COMP Drop ball/rod. Set packer and test tubing to 3,500 psi for 30 minutes. Bleed tubing pressure to 1,500 psi. Test IA to 3,500 psi for 30 minutes. Bleed tubing pressure and shear RP valve. 14:00 - 14:30 0.50 RUNCOIVP COMP Set TWC. Test from below to 1,000 psi. 14:30 - 16:00 1.50 BOPSURP COMP ND BOP. 16:00 - 17:00 1.00 WHSUR P COMP NU tree. 17:00 - 17:30 0.50 WHSUR P COMP Test adapter flange and tree to 5,000 psi for 15 minutes each. 17:30 - 18:00 0.50 WHSUR P COMP Pull TWC with lubricator. 18:00 - 19:00 1.00 CHEM P COMP RU hot oil. Test lines to 2,000 psi. Pump 82 bbls diesel down IA. 19:00 - 20:00 1.00 CHEM P COMP U-tube diesel into tubing to +/- 2,330'. 20:00 - 20:30 0.50 WHSUR P COMP Set BPV and test from below to 1,000 psi. 20:30 - 21 :00 0.50 WHSUR P COMP Secure well. Release rig at 21 :00 hours on 4/20/02. Printed: 4/22/2002 11 :43:09 AM ) ) Well: Field: API: Permit: W-211 Prudhoe Bay Field / Polaris Pool 50-029-23080-00 202-075 Rig Accept: 04/14/02 Rig Spud: 04/14/02 Rig Release: 04/20/02 Drilling Rig: Doyon 14 POST RIG WORK 05/16/02 ATTEMPT TO PULL BALL & ROD. UNABLE TO GET DEEPER THAN 5561' WLM (ATTEMPTING TO GET DOWN TO 4 1/2 RHC-M PLUG IN X-NIPPLE @ 5604' MD 05/17/02 PULL BALL AND ROD 1 318" FN --- PULL STA# 1 1.5" DGLV & STA# 3 RPI SHEAR, ---SET STA# 3 DGLV & *** RUNNING SPMG IN STA# 1 05/18/02 SET 1 112" RK, SPMG @ 5446' SLM, STA#1 ATTEMPT TO PULL RHC PLUG----TIGHT SPOT @ 5561' TO 5565' START WORKING AT OPENING UP RAN, 2.65" CENT, 2.70", & 2.74" UNABLE TO GET TO STICK--- START RUNNING BROACHES. RHC-M PLUG WAS UNLOCKED WITH SWAGE AND FELL TO 6520' TO. 05/19/02 ATTEMPT TO OPEN UP TIGHT SPOT @ 5564' SLM, RAN 2.70" & 2.735" BROACHES WORKED TILL FREE WITHOUT HANGING UP STILL NEEDS TO BE BROACHED LARGER, TO BE ABLE TO RETREIVE 31/2" RHC PLUG W/2.80" BODY AT 6520' SLM--- RUN 2.5" SPENT DUMMY GUN TO TD @ 6520' SLM NO PROBLEM GETTING DOWN HOLE. RIH WI 2.5" 4 SPF PERFORATING GUN AND GUN/GAMMA AND TIE INTO SPERRY SUN MWD AND PERFORM JEWELRY LOG FROM 6545- 5470'. PERFORATE INTERVAL FROM 6310'-6300'. RIH WI 20' 2.5" PERF GUN AND PERFORATE INTERVAL 6280'-6300'. RIH WI 5' 2.5" GUN AND PERFORATE 6350'-6355'. PERF ON BALANCE TO SLIGHTLY OVERBALANCED. GOOD SHOT INDICATIONS. OS/20/02 MIT-IA PASSED @ 3500 PSI., INJECTIVITY TEST PERFOMED ON TUBING:1 BPM @ 1500 PSI FOR FIRST 20 BBLS, INCREASED RATE TO 3 BPM @ 2000 PSI FOR LAST 5 BBLS. SBHPS WI TRIPLE PETREDAT GAUGES @ 6295' MD - PRESSURE = 2230#. OS/21/02 FRAC'D SCHRADER OBD AND OBE SANDS WITH 70# NXL HEC SYSTEM AND 119.7K# OF 16/20 PROP. PLACED 95.9K# PROP (30.4K# C-LlTE AND 65.4K# RCP) BEHIND PIPE BEFORE NWBSO TO 7351 PSI. SCREENED OUT WITH 168 BBLS PPGA IN PERFS, 23.8K# OF PROP LEFT IN CSGffBG. AVG TREAT =4775 PSI, LOAD TO RECOVER = 700 BBLS, ALL TREESAVER CUPS RECOVERED. CTU #2, POST OBD & OBE FILL CLEAN OUT. PICKED UP UNIT 2 IN KUPARUK. STOOD BY FOR RIG DOWN OF FRAC EQUIPMENT AND THE COIL RIG UP FOR CLEANOUT. OS/22/02 LOGGED SCMT FROM TD 6200'-5600' WITH ZERO & 2100 PSI, GOOD BOND. TAG TOS @ 6200' ELM. PERFORATED 6150'-6160' WITH 2.5" POWERFLOW, 4 SPF, 180 DEGREE PHASE, +1- 90 DEGREES FROM LOW SIDE. CHARGE DATA: .66" EH, 4.8" PENE, 10.5 GMS. ALL SHOTS FIRED. CTU #2, POST (OBD & OBE) FRAC CLEAN OUT. RIH WITH 2" REVERSE OUT NOZZLE. CLEAN OUT TO DEPTH OF 6216' LEAVING PERFS @ 6280' - 6310' COVERED. PERFORM LEAK RATE TEST @ .25 BPM 1550 PSI. FP WELL TO 2800' MD W-211 Page 2 ) ) OS/23/02 FRAC'D THE SCHRADER DBA SAND WITH 70# HEC SYSTEM AND 140.1K# OF 16/20 PROP (45K# C-LlTE AND 95.1 K# RCP). INTENTIONALLY UNDERFLUSHED THE 117 BBL 12 PPGA STG BY 5 BBLS FROM THE WELLHEAD DENSOMTER. PLACED 139K# PROP BEHIND PIPE AND LEAVING 1 K# IN CASING, EST. TOS= 6080', MAX TREAT = 3660 PSI, AVG TREAT = 2929 PSI. RECOVERED ALL TREESAVER CUPS, WELL NOT FREEZE PROTECTED. LOAD TO RECOVER IS 1400 BBLS (INCLUDES BOTH FRACS). OS/24/02 COMPLETE BOP TEST. MU JETTING ASSEMBLY. SWIVEL PROBLEMS. WAIT ON PARTS. INSTALL NEW REEL SWIVEL & PT. TAG FILL @ 6105", LEFT 45' OF FILL ABOVE TOP PERF @ 6150'. CIRC HOLE CLEAN WITH HEC & KCL. WASHED TBG JEWELRY. FP WELL TO 2800'. WELL READY FOR SLlCKLlNE. OS/25/02 DRIFTED WITH 2.50" CENTRALIZER & SAMPLE BAILER. SAT DOWN @ 6084' WLM. (TOP OF PERFS @ 6280'). BAILER EMPTY. PULLED 1 1/2" SPMG FROM STA #1. PULLED 1 1/2" DUMMY FROM STA #3. RAN DOME GLV TO STA #3. IN PROGRESS. OS/26/02 SET 1 1/2" DOME GLV IN STA #3 (1743 TRO - 1/4" PORT). SET 1 1/2" S/O GLV IN STA #1 (5/16" PORT). PULL CATCHER. OS/27/02 PREHEAT THE WELL BORE WITH 180* F. DIESEL DOWN THE LA. PRIOR TO FLOWBACK. LEAD OFF WITH 10 BBLS. OF NEAT METHANOL. PUMP 125 BBLS. OF HOT DIESEL AND FINISH WITH 10 BBLS. OF NEAT METHANOL. 06/01/02 MIRU UNIT #8. CLEAN OUT TO A TO OF 6400 USING SLICK KCL AND HEC. WELL WAS ON GAS LIFT AT 1.75 MIL.DURING CLEAN-OUT. RETURNS MONITORED THROUGH TEST SEPERATOR. POH AND MONITOR WELL. 06/1 0/02 PUMP 20 BBLS OF METHANOL AND 30 BBLS OF 50/50 METHANOL DOWN THE TUBING. DRIFTED TUBING WITH A 2.47" SWEDGE AND SAMPLE BAILER SD @ 1250' SLM, HYDRATES ON SB LRS PUMP 50 BBLS METH TAG TO @ 6386' CORR TO ELM, RDMO AOGCC Attn: Lisa Weepie 333 W. 7th Avenue, Suite 100 Anchorage, Alaska 99501 ) Definitive Re: Distribution of Survey Data for Well W-211 Dear Sir / Madam: Enclosed are 1 survey hard copy(s) and 1 disk. Tie-on Survey: Window / Kickoff Survey Projected Survey: 'MD 'MD 6,645.00 ' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) Rt:Ct:IIIS !/,^, D V'\' 1 Al '"'; J . 8 ?oa~ ~OiI&Gas (.. ~ ~~ ) ~œ-a7S ---- DEFINITIVE North Slope Alaska BPXA PBU_WOA WPat1, Slot W-211 W-211 Job No. AKMW22064, Surveyed: 18 April, 2002 .~ SURVlEY REPORT 13 June, 2002 Your Ref: API50tJ8230BOOO Surface Coordinates: 5959377.88 H, 611789.04 e (TO° 17' 52.7113" H, 149005' 40.9063" W) Kelly Bushing: 84.92ft above Mean Sea Level '-"":~.'J;~ ,., DRILLING sJAvlces A Halliburton Company Survey Ref: svy11174 Sperry-Sun Drill1"fI-"8eJ1lices DEFINITIV~ Survey Repon~~-~..211 Your R.f: API SOIJØ230BOOO Job No. AKMW22064, Surveyed: 18 April, 2002 BPXA North Slope Alaska PBU_WOA W Pad Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azlm. Depth Depth Northlngs Eastlngs Northlngs Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 0.00 0.000 0.000 -84.92 0.00 O.OON O.DOE 5959377.88 N 611789.04 E 0.00 MWD Magnetic 113.04 0.220 112.320 28.12 113.04 0.08S 0.20E 5959377.80 N 611789.24 E 0.195 0.21 168.97 0.180 12.790 84.05 168.97 0.04S 0.32E 5959377.85 N 611789.36 E 0.548 0.29 252.87 0.990 70.490 167.94 252.86 0.33N 1.03 E 5959378.23 N 611790.07 E 1.081 0.72 349.77 2.440 90.720 264.80 349.72 0.59N 3.88 E 5959378.52 N 611792.91 E 1.599 3.06 438.23 3.350 99.790 353.15 438.07 0.12 N 8.31 E 5959378.13 N 611797.35 E 1.149 7.12 527.85 3.490 112.120 442.61 527.53 1.35 S 13.42 E 5959376.73 N 611802.48 E 0.834 12.27 616.79 4.480 119.730 531.33 616.25 4.095 18.95 E 5959374.07 N 611808.04 E 1.260 18.43 705.88 5.590 123.880 620.08 705.00 8.245 25.57 E 5959370.03 N 611814.73 E 1.310 26.24 802.05 6.430 119.740 715.72 800.64 13.52 5 34.13 E 5959364.87 N 611823.37 E 0.982 36.30 893.11 8.340 121,260 806.02 890.94 19.47 S 44.21 E 5959359.06 N 611833.53 E 2.108 48.00 994.09 10.570 121 . 140 905.62 990.54 28.07 S 58.40 E 5959350.69 N 611847.85 E 2.208 64.58 1089.88 12.880 122.100 999.41 1084.33 38.28 S 74.96 E 5959340.72 N 611864.56 E 2.420 84.04 1183.76 14.870 123.930 1090.54 1175.46 50.57 5 93.82 E 5959328.71 N 611883.61 E 2.170 106.52 1279.92 16,890 125.410 1183.03 1267.95 65.55 S 115.45 E 5959314.05 N 611905.45 E 2.142 132.75 1375.43 19.380 124.650 1273.79 1358.71 82.60 5 139.80 E 5959297.37 N 611930.05 E 2.619 162.37 1471.68 22.370 123.600 1363.71 1448.63 101.825 168.20 E 5959278.57 N 611958.73 E 3.131 196.59 1567.85 25.000 121.850 1451.77 1536.69 122.68 5 200.71 E 5959258.20 N 611991.55 E 2.830 235.18 1662.30 27.850 121.860 1536.34 1621.26 144.865 236.40 E 5959236.55 N 612027.57 E 3.017 277.19 1758.08 27.740 122.310 1621.07 1705.99 168.58 S 274.25 E 5959213.39 N 612065.76 E 0.247 321.83 '- 1855.22 29.280 121,330 1706.43 1791.35 193.02 S 313.65 E 5959189.55 N 612105.52 E 1.657 368.18 1950.49 30.350 118.810 1789.09 1874.01 216.73 S 354.64 E 5959166.44 N 612146.86 E 1.729 415.53 2046.92 29.740 119.340 1872.57 1957.49 240.19 S 396.84 E 5959143.61 N 612189.40 E 0.690 463,80 2144.27 31.560 119.760 1956.31 2041.23 264.67 S 440.00 E 5959119.78 N 612232.93 E 1.882 513.43 2240.92 33.480 119.790 2037.80 2122.72 290.475 485.10 E 5959094.65 N 612278.41 E 1.987 565.38 2336.15 35.600 120.710 2116.24 2201.16 317.68 S 531.73 E 5959068.14 N 612325.44 E 2.293 619.37 2431.90 38.340 118.720 2192.74 2277.66 346.195 581.75 E 5959040.38 N 612375.88 E 3.122 676.94 2527.98 40.270 117.480 2267.08 2352.00 374.85 S 635.44 E 5959012.53 N 612429.98 E 2.169 737.75 2624.44 42.670 117.970 2339.36 2424.28 404.57 S 691.98 E 5958983.65 N 612486.96 E 2.511 801 ,56 2720.53 45.450 118.040 2408.40 2493.32 435.94 5 750.97 E 5958953.16 N 612546.41 E 2.894 868.33 - ----- ~-~-- 13 June, 2002 - 10:33 Page 20'5 DrillQlIest 2.00.08.005 Sperry-Sun Dri/Nng Services;. . Survey ReportrorW-211 Your Ref: APl5OfI2Ø230S000 Job No. AKMW22064, SUNeyed: 18 April, 2002 BPXA North Slope Alaska PBU_WOA W Pad Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northlngs E..tlngs Northing. Eastlngs Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft) 2814.72 45.370 117.830 2474.52 2559.44 467.36 S 810.23 E 5958922.62 N 612606.13 E 0.180 935.35 2893.46 45.970 118.270 2529.55 2614.47 493.85 S 859.94 E 5958896.87 N 612656.23 E 0.860 991.63 2959.00 45.590 118.400 2575.26 2660.18 516.14 S 901.28 E 5958875.20 N 612697.90 E 0.597 1038.58 3051.03 45.270 118.600 2639.84 2724.76 547.43 S 958.90 E 5958844.78 N 612755.97 E 0.381 11 04. 11 3146.42 45.280 118.480 2706.97 2791.89 579.81 S 1018.43 E 5958813.29 N 612815.99 E 0.090 1171.85 3242.14 45.200 117.440 2774.37 2859.29 611.67 S 1078.47 E 5958782.32 N 612876.49 E 0.776 1239.77 3336.19 45.090 116.550 2840.70 2925.62 641.94 S 1137.87 E 5958752.94 N 612936.34 E 0.681 1306.33 3434.48 44.810 114.230 2910.27 2995.19 671.71 S 1200.60 E 5958724.10 N 612999.49 E 1.692 1375.51 3530.93 43.350 119.790 2979.58 3064.50 702.12 S 1260.34 E 5958694.59 N 613059.69 E 4.285 1442.44 3627.12 43.740 121.820 3049.31 3134.23 736.06 S 1317.25 E 5958661.50 N 613117.10 E 1.509 1508.70 3722.35 43.250 121.370 3118.39 3203.31 770.40 S 1373.08 E 5958627.99 N 613173.43 E 0.609 1574.23 3818.14 44.570 121.960 3187.40 3272.32 805.27 S 1429.62 E 5958593.96 N 613230.48 E 1.443 1640.64 3912.82 46.050 121.660 3253.98 3338.90 840.75 S 1486.82 E 5958559.34 N 613288.20 E 1.579 1707.92 4007.74 45.850 122.940 3319.98 3404.90 877.20 S 1544.49 E 5958523.75 N 613346.40 E 0.992 1776,10 4104.64 45.250 125.640 3387.84 3472.76 916.16 S 1601.63 E 5958485.65 N 613404.12 E 2.083 1845.09 4199.97 45.780 121.950 3454.65 3539.57 953.97 S '1658.14 E 5958448.68 N 613461.18 E 2.817 1912.94 4295.55 45.470 120.880 3521.50 3606.42 989.58 S 1716.44 E 5958413.94 N 613520.01 E 0.863 1981.24 4390.49 45.210 121.070 3588.23 3673.15 1024.33 S 1774.34 E 5958380.05 N 613578.42 E 0.309 2048.77 4488.24 44.750 121.950 3657.38 3742.30 1060.44 S 1833.24 E 5958344.82 N 613637.86 E 0.791 2117.85 4582.89 44.340 123.480 3724.84 3809.76 1096.32 S 1889.10 E 5958309.78 N 613694.24 E 1.214 2184.17 '- 4678.29 43.860 122.500 3793.35 3878.27 1132.47 S 1944.79 E 5958274.46 N 613750.46 E 0.874 2250.49 4774.06 44.050 121.360 3862.29 3947.21 1167.63 S 2001.20 E 5958240.15 N 613807.39 E 0.850 2316.93 4869.36 43.500 122.640 3931.10 4016.02 1202.56 S 2057.11 E 5958206.05 N 613863.81 E 1.094 2382.83 4966.73 43.090 121.740 4001.97 4086.89 1238.13 S 2113.62 E 5958171.33 N 613920.84 E 0.761 2449.56 5062.17 42.410 122.360 4072.06 4156.98 1272.51 S 2168.53 E 5958137.77 N 613976.26 E 0.838 2514,31 5158.18 41.170 120.320 4143.64 4228.56 1305.79 S 2223.16 E 5958105.30 N 614031.38 E 1.916 2578.27 5252.80 39.450 119.610 4215.79 4300.71 1336.37 S 2276.19 E 5958075.52 N 614084.85 E 1.881 2639.48 5349.89 37.810 120.010 4291.64 4376.56 1366.50 S 2328.78 E 5958046.18 N 614137.89 E 1.709 2700.09 5445.39 36.410 118.660 4367.80 4452.72 1394.73 S 2379.00 E 5958018.69 N 614188.52 E 1.696 2757.69 5541.04 36.520 120.660 4444.72 4529.64 1422.86 S 2428.39 E 5957991.30 N 614238.33 E 1.248 2814.53 --_....--~~ -~-- 13 June, 2002 - 10:33 Page 3 0'5 DrillQuest 2.00.08.005 Sperry-Sun Drilling Serviaes . Survey Report for W..211 Your Ref: API 5OIf92308000 Job No. AKMW22064,Su".yed: 18 April, 2002 BPXA North Slope Alaska PBU_WOA W Pad Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azlm. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 5636.80 35.340 118.410 4522.27 4607.19 1450.57 S 2477.27 E 5957964.32 N 614287.61 E 1.849 2870.71 5732.61 32.470 115.960 4601.78 4686.70 1475.02 S 2524.77 E 5957940.58 N 614335.48 E 3.317 2924.07 5828.82 28.720 115.650 4684.58 4769.50 1496.34 S 2568.85 E 5957919.92 N 614379.86 E 3.901 2972.88 5926.10 23.980 118.380 4771.73 4856.65 1515.86 S 2607.33 E 5957900.97 N 614418.63 E 5.028 3015.96 6022.44 19.940 120.850 4861.07 4945.99 1533.60 S 2638.67 E 5957883.70 N 614450.24 E 4.301 3051.97 6117.93 18.400 121.110 4951.26 5036.18 1549.74 S 2665.56 E 5957867.96 N 614477.36 E 1.615 3083.32 6213.87 17.480 120.690 5042.53 5127.45 1564.92 S 2690.91 E 5957853.16 N 614502.93 E 0.968 3112.87 6310.50 15.470 122.720 5135.19 5220.11 1579.29 S 2714.24 E 5957839.14 N 614526.47 E 2.163 3140.26 6406.54 15.680 121.810 5227.70 5312.62 1593.05 S 2736.04 E 5957825.70 N 614548.48 E 0.335 3166.03 6501.31 15.310 122.340 5319.03 5403.95 1606.50 S 2757.50 E 5957812.58 N 614570.13 E 0.418 3191.34 6576.56 15.120 121.210 5391.64 5476.56 1616.90 S 2774.29 E 5957802.43 N 614587.07 E 0.468 3211.08 6645.00 15.120 121.210 5457.71 5542.63 1626.15 S 2789.55 E 5957793.41 N 614602.47 E 0.000 3228.93 Projected Survey All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from Well and calculated along an Azimuth of 120.240° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 6645.00ft., The Bottom Hole Displacement is 3228.93ft., in the Direction of 120.240° (True). --/ -------- ----- 13 June, 2002 - 10:33 Page 4 0'5 DrillQuest 2.00.08.005 Sperry-Sun Drilling Services Survey Reportfßr W-211 Your Ref: APl5OtJØ23DBOOO . Job No. AKMW220fU,SUIft(Wèd: 18 April, 2002 . North Slope Alaska BPXA PBU_WOA W Pad Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment -' 6645.00 5542.63 1626.15 S 2789.55 E Projected Survey Survey tool program for W-211 From To Measured Vertical Measured Vertical Depth Depth Depth Depth Survey Tool Description (ft) (ft) (ft) (ft) 0.00 0.00 6645.00 5542.63 MWD Magnetic -' - - .-------- 13 June, 2002 - 10:33 Page 50f5 Dril/Ques t 2.00.08.005 ~~~~E , ) : F !Æ~!Æ~~~] ~ ALASKA OIL AND GAS CONSERVATION COMMISSION TONY KNOWLES, GOVERNOR 333 W. pH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Lowell Crane Senior Drilling Engineer BP Exploration (Alaska) Inc. P. O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit W-211 BP Exploration (Alaska) Inc. Pennit No: 202-075 Sur Loc: 4404' NSL, 1444' WEL, SEC. 21, TIIN, RI2E, UM Btmhole Loc: 2812' NSL, 1284' EWL, SEC. 22, TIIN, RI2E, UM Dear Mr. Crane: Enclosed is the approved application for pennit to drill the above referenced well. The pennit to drill does not exempt you from obtaining additional pennits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Annular disposal has not been requested as part. of the Permit to Drill application for Prudhoe Bay Unit W-211. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, (t r1 " " UZ'n~ßJ,~ ~-/ Cammy déchsli Taylor Chair BY ORDER OF THE COMMISSION DATED this 2..1 flday of March, 2002 jjcÆnclosures cc: Department of Fish & Game, Habitat Section wlo encl. Department of Environmental Conservation wlo encl. Hole 30" 12-1/4" 8-3/4" STATE OF ALASKA ' ALASKA 01... ~D GAS CONSERVATION COMMIS... IN PERMIT TO DRILL 20 AAC 25.005 1 b. Type of well 0 Exploratory 0 Stratigraphic Test II Development Oil 0 Service 0 Development Gas 0 Single Zone 0 Multiple Zone 5. Datum Elevation (OF or KB) 10. Field and Pool Plan RKB = 84.1' Prudhoe Bay Field / Polaris 6. Property Designation Pool (Undefined) ADL 028263 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number W-211 9. Approximate spud date 04/15/02 Amount $200,000.00 14. Number of acres in property 15. Proposed depth (MD and TVD) 2560 6536' MD / 5433' TVD 0 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} 45 Maximum surface 1825 psig, At total depth (TVD) 5324' / 2360 psig Setting Depth TQD Bo~om MD TVD MD TVD Surface Surface 80' 801 Surface Surface 2972' 2663' Surface Surface 6536' 5432' ~wt -s{2.1fOl- ~)/;}~ 1 a. Type of work II Drill 0 Redrill 0 Re-Entry 0 Deepen 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 4404' NSL, 1444' WEL, SEC. 21, T11 N, R12E, UM (As Staked) At top of productive interval 2877' NSL, 1180' EWL, SEC. 22, T11 N, R12E, UM At total depth 2812' NSL, 1284' EWL, SEC. 22, T11 N, R12E, UM 12. Distance to nearest property line 13. Distance to nearest well ADL 047452,2812' MD No Close Approach 16. To be completed for deviated wells Kick Off Depth 700' MD Maximum Hole Angle 18. Casin~ Program Specifications Size Casina Weiqht Grade Couplina 20" 91.5# H-40 Weld 9-5/8" 40# L-80 BTC-M 7" 26# L-80 BTC-M 11. Type Bond (See 20 AAC 25.025) Number 2S100302630-277 Lenath 801 2972' 6636' Quantitv of Cement (include staae data) ~60 sx Arctic Set (Approx.) 558 sx AS Lite III, 253 sx Class 'G' 145 sx 0-79,307 sx Class 'GI 19. To be completed for Red rill , Re-entry, and Deepen Operations. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical feet feet feet feet Junk (measured) Plugs (measured) Casing Structural Conductor Surface Intermediate Production Liner Length Size Cemented MD TVD \" "" \, ~""\I 7 . Perforation depth: measured true vertical 20. Attachments II Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch II Drilling Program II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements Contact Engineer NameINumber: Walter Quay, 564-4178 Prepared By NameINumber: Terrie Hubble, 564-4628 21. I hereby certify that the fore ing is true a~ correct to the best of my knowledge Signed Lowell Crane t-ec.e... .,.. ...... Title Senior Drilling Engineer Date 3 -2 2-CY2-. , ., .COtl1mf"'fm ~..Qnly.' . , . Permit Number API Number J9prova, Date See cover letter 2-.0.2. - c:J 7_? 50- 0 Z 9 - .2 3 0 ~ d ~d.ll D ~ for other requirements Conditions of Approval: Samples Required 0 Yes àrNo Mud Log Required 0 Yes ;:E(No Hydrogen Sulfide Measures 0 Yes ..::s-NO Directional Survey Required ":EI Yes 0 No Required Working Pressure for BOPE D2K 0 3K D4K D5K 0 10K 0 15K ~5K psi ~~ ~ Other: Approved By Form 10-401 Rev. 12-01-85 Original Signed By by order of Cammy Oethsli ClO~..l~sii~e(. , \ ..~ ~~e fommission J t\ I \J ~ ~ ~ Þ'A~~ Go- Date3Ld.l/~ Submit In Triplicate WEL.¿ NAME: w ~ 111 Well Plan Summary Type of Well (producer or injector): I Schrader Bluff Producer Surface Location: 875' FNL 1444' FEL, T11 N, R12E, S21 X = 611,789.04 E, Y = 5,959,377.88 N 2877' FSL (24011 FNL), 40981 FEL (11801 FWL), Sec. 22, T11N, R12E X = 614,440 E, Y = 5,957,891N 28121 FSL (2467' FNL), 39951 FEL (12841 FWL), Sec. 22, T11 N, R12E X = 614,545 E, Y = 5,957,827 N Target Location: #1 Bottom Hole Location: I AFE Number: I Estimated Start Date: MD: 6536' 15M1027 I Rig: I Doyon 14/ I 4/15/02 /' I Operating days to complete: I 13 TVD: 5433' RKB/Surface Elevation (a.m.s.l) *as staked 84.1 ' / 53.2' Ultra-slimhole directional well. Kick-off in the Permafrost building to 45° tangent angle in the SV6 - SV2 fromations. A drop in angle is planned from the -5300' to TD, with the final angle being 17° at top of the Schrader Bluff Ma and held to TD Well Design (conventional, slimhole, etc.): I Objective: I Polaris Production well Formation Markers MD TVD (SS) 2134 -2034 2153 -2059 2299 -2179 2838 -2569 3121 -2769 3573 -3089 4096 -3459 4167 -3509 4693 -3874 5642 -4589 5709 -4649 5775 -4709 5834 -4764 5898 -4824 5924 -4849 5966 -4889 6065 -4984 6118 -5034 6160 -5074 6196 -5109 6254 -5164 6332 -5239 6369 -5274 6241 -5324 6536 -5434 Formation Tops Base Permafrost SV5 SV4 SV3 SV2 SV1 UG4 UG4A UG3 Ma Mb1 Mb2 Mc Na Nb Nc OA OBa OBb OBc OBd OBe OBf OBf_Base TD W -211 Drilling Permit.doc Comments Top Schrader Bluff Sand 3/22/2002 Page 1 of 7 ,CasinQlTubinJl Pr",~ram: Ultra-Slimhole L..JsiQn Hole Size Csgl WtlFt Grade Conn Length Top Tbg O.D. MDITVD 20" 91.5# H40 WELD 80' Surface 95/8" 40# L-80 BTCM 2972' Surface 1'1 26# L-80 BTCM 6636' Surface 3-1/2" 9.3# L-80 EUE-I 5600' Surface 30" 12 %" 8%" Tubing Btm MDITVD 80?80' 2972'/2663' 6536'/5432' 5600'/4552' Mud Program: Surface Interval Mud Properties: Density Viscosity Initial 8.5 - 8.6 300 below Permafrost 9.0 - 9.6*" 200 -250 i interval TD 9.8 max. 150 -200 Initial Plastic j Viscosity 9.4 - 9.5 8 -15 Density Spud Mud Fluid 12 % " hole Yield Point GPM tauO APIFL pH 50 - 70 < 550 >9 15 - 20 8.5 - 9.5 45 - 70 600 - 650 >7 <10 8.5 - 9.5 25 -45 650 >6 <8 8.5 - 9.5 LSND 8 3A " hole Yield GPM tauO Gel API pH Point Filtrate 18 - 25 550 - 600 3-7 10-18 6-8 8.5-9.5 Production Interval Mud Properties: Directional KOP: :I: 700' MD - 1.5°/100' build. 1000' MD -- 2.5°/100' build. 2100' MD -- 4°/100' build. :I: 45.0° - Build, Hold & Drop All wells pass BP Close Approach gyjdelines. The nearest close approach well is W-27, which is 32' well-to-well at 792' MD. There is also another well that approaches W-211 as it passes through the eastern row of W-Pad wells... W-1 is 148' away at 2880' MWD Surveys from surface to TD. ESS to be dropped Gyro may be needed for surface hole. Maximum Hole Angle: Close Approach Well: Survey Program: W -211 Drilling Permit.doc 3/22/2002 Page 2 of 7 Cement Calculati(,l~s: ') Casing Size 19-5/8" Surface - 1 Stage I Basis: Lead: Based on 2472' of open hole from surface to 2472' MD + 250 % excess across the permafrost, 300/0 Excess below t~ permafrost.. Lead TOG: Surface Tail: Based on 500' MD open hole volume + 82' shoe track volume + 300/0 excess. Tail TOG: At -2472' MD / ./ Total Cement Volume: Lead 441bbl / 2477 ft;; / 558 sks of Dowell ASIII Lite at 10.7 ppg and 4.44 cf/sk. / 53 bþl / 296 fe / 253 sks of Dowell Premium 'G' at 15.8 ppg and 1.17 cf/sk. Tail If logs indicate the UG4 does not contain significant hydrocarbons, the program will be amended to provide cement above the top of the Schrader only. (Lead slurry will be eliminated.) Casing Size 17" Intermediate I Basis: Lead: Based on¡1000' of open hole (to 500' MD above top UG4) with *50% excess. Lead TOG: At -3596' MD (-3100' TVD). Tail: Based on 82' shoe track volume and 1400' of open hole with 300/0 excess. / Tail TOG: At -5150' MD ,/ I Total Cement Volume: Lead 62 bbl / 350ft;; / 145 sks of Dowell D-79 Slurry 12.0 ppg at 2.41 cf/sk Tail 64 bbl / 359 ft;; / 307/Šks of Dowell Premium 'G' at 15.8 ppg and 1.17/ cf/sk. ,Loaaina Proaram LWD Logging: 12 1A" Hole 8 %" Hole Open Hole Logs (eline): 121A" Hole 8 %" Hole Cased Hole Logs (eline): MWD directional / GR MWD directional / GR / Res / GNL / Den No Logs needed USIT as contingency if cement operation is suspect. W -211 Drilling Permit.doc 3/22/2002 Page 3 of 7 Well Control: ') ) Well control equipment consisting of 5000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Based upon casing test pressure, the BOP equipment will be tested to 3500 psi. r-- Diverter, BOPE, and drilling fluid system schematics are on file with the AOGCC. Production Interval- / . Maximum anticipated BHP: 2,360psi @ 5324' TVDss - Base Of Schrader (8.5 ppg) . Maximum surface pressure: 1,825 psi @ surface (based on BHP and a full column of gas from TO @ 0.10 psi/ft) . Planned BOP test pressure: 3500 psi / . Planned completion fluid: 8.5 ppg sea water / 6.8 ppg Diesel Drilling Hazards/Contingencies: HYDROGEN SULFIDE - H2S . W Pad is not designated as an H2S drill site, however Standard Operating Procedures for H2S precautions should be followed at all times. DRilliNG CLOSE APPROACH: . All wells pass close approach guidelines. Disposal: . No annular injection in this well. . Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at D8-04. Any metal cuttings will be sent to the North Slope Borough. . Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to 08-04 for injection. Haul all Class I wastes to Pad 3 for disposal. / W -211 Drilling Permit.doc 3/22/2002 Page 4 of 7 DRILL AND COhllÞLETE PROCEDURE ~bMMARY Pre-Rig Work: The 20" conductor is set. 1. Weld an FMC landing ring for the FMC Gen. V Wellhead on the conductor. 2. If necessary, level the pad and prepare location for rig move. Rig Operations: I 1. MIRU Doyon 14. /' 2. Nipple up and function test 21-1/4" diverter system. PU 5" DP as required and stand back in derrick. 3. MU 12 14" drilling assembly and drill surface hole to to planned KOP at approximately 700' MD. Build angle initially at 1.5°/100' increasing to 4°/100' reaching a tangent angle of 45° by 2500' MD and TD the surface hole at approximately 2972' MD will be -100' below the top of the SV3 sands. 4. Run and cement the 9 5/8", 40#, L-80, BTCM casing to surface./' 5. ND diverter system and NU casing / tubing head. NU & Test BOPE ,/ / 6. MU 8 %" drilling assembly and RIH to float collar. Test the 9 5/8" casing to 3500 psi for 30 minutes. / 7. Drill out shoe joints and displace well to 9.4 ppg LSND fluid. Drill new formation to 20' below 9 5/8" shoe and perform FIT 8. Drill ahead to TD of this section; POOH. / 9. Run and cement the 7", 26# intermediate casing 10. Run 3-1/2",9.3#, L-80 completion. See attached completion schematic for details./ 11. Set packer and test the tubing to 3500 psi and annulus to 3500 psi for 30 minutes. 12. Nipple down the BOPE. Nipple up and test the tree to 5000 psi for 30 minutes. 13. Freeze protect the well to -2200' and secure the well. 14. Rig down and move off. Estimated Spud Date: 04/15/02 Walter Quay Alaska Drilling and Wells Operations Drilling Engineer, 564-4178 W -211 Drilling Permit.doc 3/22/2002 Page 5 of 7 ) ') »:;....,,~I!I¡llIIllw:wmUI:" :11 ,m :mmmClmmmmmmll,l:mlll:ICI \Lmp :I,- C~I:::II,1Im ,mfll I,II~mll, llm,mmlUmmWO,lmW!I!::,II,m:,m:,I~mll,mll!:,lml~¡,;;_,I,!:I'_:I\Io.I m_I:I:I,:ml-::::I,_ : III:,-W,II:I~II:mmlmll:mmll!mlll!IIIIII:-::m:lummlmlm,:,m:,~mmmmmm:m!lmm:'!III'II,mmm:,II__II',.::ml,I.li,:I::-¡,WII,1 Job 1: MIRU Hazards and Contingencies: ~ The adjacent well, W-27, is approximately 32' from the W-211 conductor. No wells are required to be shut in. m~:~I,¡I:-W. ~';~-:I:lnm~:I mlll:'(\\ .!IInn.. .llmTIIII- _\"_'mllml'_I'I:!I:II:'-,--,--m:IIII' -II-~llnIWllm:IU ,- - -,mt!!!!! - _lm"lmlm'!II_!I"_I~__I':!. .1. _:::~I~I!:m:ml~I:I':I:!'m::ln-I¡'lmlum:'I'llmmn-- --or "_1. . !Imllllll. _11'IIC:-T:,:-m:lmU-WIIII:tl:-,:l::lmilnllllllllllll;,--:mllml-'III Job 2: DrilI12~" Surface Hole Hazards and Contingencies: ~ At W-Pad, no significant surface hole drilling problems have been identified. Minor tight hole has been encountered in the clay sections below the permafrost, some lost circulation thought to be in conjunction with the tight hole, possible packing off has been encountered. :1:~:I---lm:--:lI:-III~:I-:II'~:I I:m:mlnmla~II~lmm'mmllmmmmla:mmmlnmlnI11:lmml_11:'~I:a:-'I:I~:mllml!mmll',llm"!:mlmm:llmm_lm:I:---I:lmll~1111ml!mml!11:ml::::~-:--1--I Job3: Install Surface Casing Hazards and Contingencies: ~ At W-Pad, Lost circulation has been experienced while running and cementing surface casing. Be sure to condition and thin mud appropriately prior to pulling out of the hole to run casing. Once on bottom with casing, bring circulation up slowly and reduce mud viscosities before pumping cement. ~ It is critical that cement is circulated to surface for well integrity. 2500/0 excess cement is planned through the permafrost zone and 300/0 excess is planned below the permafrost. As a contingency, a 9-5/8" port collar will be positioned at +/-1000' MD to allow a secondary circulation point as required. A) A ~~~~1:I:**~-m,,,,I¡I.,~~~~M~$m.~¥X.~OOJ:W.~~;r1j¡~J¡::;II¡J,~***,*~~~~*~~~~~~~~I.W\$,.I:~~'''''>t:'~. ~~':It»-.o;-J:>~~,,~;';"~,,-,,-e;¡';'....:""~;;'¡¡¡y,I,I,~ Job 4: Drill 8%" Production Hole Hazards and Contingencies: ~ Gas cut mud/well flowing has been observed in the Ugnu (3,459' TVDSS)./ThiS will be controlled with appropriate mud weights. A minimum of 9.4 ppg is recommended. ~ Differential Sticking could be a problem if lost circulation is occurring or if the drill string is left stationary for an extended period or time across the permeable Schrader Sands. ~ The kick tolerance for the 8-3/4" open hole section would be 59.2 bbls assuming an influx from the Schrader Bluff interval at -5640' MD. This is a worst case scenario based on a 9.0 ppg pore pressure gradient, a fracture gradient of 12.5 ppg at the 9-5/8" shoe, and 9.4 ppg mud in the hole. ~ The well path in not expected to cross any faults. Job 6: Install 7" Production CasinQ Hazards and Contingencies: W -211 Drilling Permit.doc 3/22/2002 Page 6 of 7 ~ ~ > Tight hole, packing off anht circulation have been experienced whil lnning casing though this interval. Good hole cleaning and mud conditioning are required for running this string. > Differential Sticking could be a problem if lost circulation is occurring or if the casing is left stationary for an extended period or time across the permeable sands. Ensure the casing is centralized across any permeable zones if the casing is left stationary while running in the hole. ~J;mm.w.wm.wm>,~i,:m~;)m,:.c.c,lm!;;,:,I,I¡»,:mm,l.I.Im,:m.I »m;'1J,",lmmi,W,:,W!mmm;,c,cmm;mmmmm,rmmmm.ijmmm.;,:mmmmm:mmm:,DJ¡.m.c.c.wmmmA~,:;':;;;;;;¡';;""m,'4;,'"""~»?~'m,w.:"",,...m.~""~»m~)i~,-.-Å-;Å-.I,I,m,-m,-.c.c,:;m¡,:m.:mm!m;-m';¡,I.a,;mm,-,I,I,:;'I,:¡,;,-,,-;,:mm.-,-.c.c,-m,w.;;.-¡mm,-m,-m¡^a!.O¡.'!i*,¡,x-~~..m"""'Y¡< o"i~,'~»}»'¡":m''''''''~,¡';;:::,'i'/ilÞm,c,c!;mm¡.!mmmm Job 12: Run Completion Hazards and Contingencies: Reference RP: .:. 'Completion Design and Running' RP 11:IIWI:II!,II,:~,ml:I:'II:lml:,:I,I_III.m:I:II!I:II:!,1:1:1:1~III:mll I,III,:mmm,IIII,llmCI,IIIIII,llc:m:,11,1:DI::,llllm:,IICIIIII,I,I:IIC,lmICIIII:lllllml:mCIDll.I:11,1:ml,IIIIIIIIIaa:IL-II,:II-,lllmmmml:au:II:~m.!I:IIIIII:1111111_::ml.rll.:I:III.m:IIII.m:lrlmmm,l,rllln:.III:I:mmu1I111.mlm:.m.ll:r:.II.lllC:,anl.llrmlmI111:1:lm,111U1I,mmmrmlanlml.ml:::11mlm:mm.ml:1ml:I.I:.:UIIII:~~mmUlmmCIII11:IIIC:mm: Job 13: ND/NU/Release Ria Hazards and Contingencies: > Diesel will be used to freeze protect the well. The diesel flash point Is 100° F. Diesel vapor pressu re is - 0.1 psia at 100° F. W -211 Drilling Permit.doc 3/22/2002 Page 7 of 7 TREE = . 4" 5000 psi WELLHEAD= FMC 11" 'Ä'CTÛATÖR;""'w,..,^"w,.,.w""",.".",.",,._." :B~.:,.~,~~~':.::,~~.'::,~~CI~L~.~ BF. ELEV = est. @ 50 'KOP ~--~-M~600' .'Mãx"Arlg¡e-;"-'"¡5õ'.@".25ÕÓ~'" Datum K~W57-'~-00 bkb """"",.,..................'.w,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,w,,,,,,,,,,,,,,,,,,,,,""''''-.w,,,,,,,,,,,,,,w,''''''',''''''''''''''''',..........w.w,....,. Datum ìVD= 5025 SS I 9 5/8" 40# L-80 W-211 J...)oposed ComplebJn -1 SI'fÐYN)TES ~ ¡I 170' 1 I I . 11000' I I TAM Port collar 12200' I 1 X Nipple, 2.813" ID XO 4-1/2" X 3-1/2" I I I I 2972' I~ GAS LIFT MANDRELS lVD DEV I TYÆ MAN I LATCH (calc actual MD from ìVD) (calc actual MD from ìVD) (2 jts above #1) (1 jt above packer) ~ STA MD 4 3 2 1 Minimum ID = 2.813" 13-1/2",9.3# L-80,EUE-1 I L I 5600' I I I 15520' X Nipple, 2.813" ID 1 Z Z ----15540' 1 Production Packer I f ~ 15555' 1 X Nipple, 2.813" I.D. I 15560' 1 X Nipple, 2.813" ID 1 15600' I WLEG I 50' Ab ove Ma Sand PERFORATION SUMMARY REF LOG: ANGLE AT TOP PERF: I Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 16065' 1 Short Joint & RA tag 1 Top of O-Sand I PBTD I 1 7" 26# L-80 mBTC I DA TE REV BY 06/26/01 PGS 03/21/02 WDQ 1 6452' I I 6536' I ~ COMMENTS PRUDHOE BAY UNrr I AURORA FIELD WELL: W-211 ÆRMrr No: 200-??? API No: 50-029-***** Sec. 21, T11 N, R12E, 90S' FNL, 1185' FEL BP Exploration (Alaska) Original Proposed Completion aN/ÆLID\lE 1Jtd({) bp 0 '2 12400 ..c: i5. Ö ~ ',:: > ë E- 3200 COMPANY DETAII$ IWAnu)(t! (~11.1.d3tì(ln ML.1ho:J: Minimum Cur..'3(uæ :c: ~= ~~v~~:hkr Nurth Eiror Surface: r1liptic31' Casing W.mi~ t.Mhod; Rulo:s ßas...d 0 Start Dir 1/100': 300' MD, 300'TVD Start Dir 1.5/100' : 600' MD, 599.86'TVD 800- REFERENCE INFORMATION SURVEY PROGRAM D<pth Fm D<pth To S1Il\'OYJPIan 83.00 1000.00 PIanœd: W-211 wpOJ VI 1000.00 653636 Planœd: W-211 wpæ VI CB-GYRO-SS MWD Tool Co.'mlinalè (N'E) Referenœ: Wen Centre: W.2\l, True North Vertical (IVD) Referenœ: I: 01 9/121198800:00 83.00 5«:lio1l (VS) Refe=œ: Slot - (O.OON,O.OOE) Measured Depth Reference: I: 01 9/121198800:00 83.00 C3lculatioo Method: Minimum QJn= Name +NI-S +FJ.W Nord:rlng W-2\l 215631 1901.75 5959377,88 Name 1VD +NI-S Plan: W-211 wp03 (W-21 ¡!Plan W-211) Created By: Ken Allen Checked: Date: 2/28/2002 Date: Reviewed: Date: WELL DETAILS EastiDg Longitude Stot Lalitude 611789.04 70"17'52.711N 149°OS'40.906W NIA TARGET DET AlLS +FJ-W NortIrir¥ Easling Shape 614394,72 Circle (Radiœ: ]00) 6]444038 Polygon 614544.73 Circle (Radim: ]00) W-211 Nb 4858.00 .]498.05 2583.90 595791856 W-21\ DBa 5033.00 .1526.6] 2629,15 5957890.67 W-21\ TD 5433.00 -]591.89 273255 5957826.95 SECTION DETAILS See MO Ine Azi TVD +N/-S 1 83.00 0.00 0.00 83.00 0.00 2 300.00 0.00 0,00 300.00 0.00 3 600.00 3.00 120.02 599.86 -3.93 4 1000.00 9.00 120.02 997.49 -24.84 5 1799.93 29.00 120.02 1750.00 -154.47 6 2085.76 29.00 120.02 2000.00 -223.80 7 2484.76 44.96 120.02 2317.71 -343.50 8 5235.55 44.96 120.02 4264.17 -1316.00 9 5935.09 17.00 122.38 4858.00 -1498.05 10 6118.08 17.00 122.38 5033.00 -1526.70 II 6536.36 17.00 122.38 5433.00 -1592.19 Dir 2.5/1 00' : 1000' MD, 997.49'TVD 1600 End [>Ir: 1799.93'MD, 1750'TVD 51 art Dir 4/1 00' : 2085.76' MD, 2000'TVD 0 Dir : 2484.76' MD, 2317.71' TVD 4000 4800 800 SV.1 'J 5i8" SV2 ,I I~ I, I. I~ I' 1fP ~m UG4 . -.:_~ UG4A ", '" --- -.....----llIG3 . ". I ~ r" . 5IJUJI ' j .' . I" "2.\ ~ 55' M D, 4264.17'1 V!) , , I.,,;ï M I ! "~...-=:-..:" Mb I =--~t._~=- --.--c--- -+-~- ~~.'~~-~~ tv~r} ~-~t-- . ~~~"=c.'=c~-::l;~~::~~= - ~ ~ ~ E ILd Dir : 5935.0'1' MQ. -11151'<' TVD , .-- OA -J~~-=~-- --~F~~ ~~'~\ I --.. 'J' . ~~~OBf ! I' . 7" ::::--~ 'r .. rc~r7r<r'ï I I I I I I I I I I I I I ( I I 1 1600 2-10u 3200 4000 Vertical Section at 120.23° [800ft/in] "(~~;~', I /000 ~~ +Fl-W DLeg TFaee VSee Target 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.80 1.00 120.02 7.85 42.98 1.50 0.00 49.64 267.34 2.50 0.00 308.75 387.32 0.00 0.00 447.33 594.46 --4.00 0.00 686.56 2277.43 0.00 0.00 2630.30 2583.90 -4.00 178.53 2986.75 W-21 I Nb 2629.08 0.00 0.00 3040.21 W-21 I OB 2732.36 0.00 0.00 3162.42 W-211 TO --/ CASING DETAILS No. TVD MD Name Size I 2663.00 2972.74 95/8" 9.625 2 5432.99 6536.35 7" 7.000 FORMATIONTOPDETARS No. TVDPath MOPath Formation 1 2033.00 2123.78 PermaITost 2 2058.00 2152.98 SV5 3 2178.00 2298.83 SV4 4 2568.00 2838.48 SV3 5 2768.00 3121.13 SV2 6 3088.00 3573.36 SV1 7 3458.00 4096.25 UG4 8 3508.00 4166.91 UG4A 9 3873.00 4682.74 UG3 10 4588.00 5641.56 Ma 11 4648.00 5709.13 Mb1 12 4708.00 5775.18 Mb2 13 4763.00 5834.59 Me 14 4823.00 5898.34 Na IS 4848.00 5924.62 Nb 16 4888.00 5966.46 Ne 17 4983.00 6065.80 OA 18 5033.00 6118.08 OBa 19 5073.00 6159.91 OBb '-.- 20 5108.00 6196.51 OBe 21 5163.00 6254.02 OBd 22 5238.00 6332.45 OBe 23 5273.00 6369.05 OBf 24 5323.00 6421.34 Base OBf All TVD depths are ssTVD plus 83' for RKBE. bp 0/.. i..j>: -j. ~:,. \-- COMI'ANY DET ^II_~ REFERENCE INFORMAT[ON B£I Amoco Co-ordinal< (NIE) Ref=nce: Well CeotIe: W-211, Trœ North V.,rocal (TYD) ReRrence: I: 01 91121198800:00 83.00 Section (YS) Refe=>ee: Slot - (O.OON,O.OOE) Measun:d Depth Ref=nce: I: 01 91121198800:00 83.00 Calrolatioo Method: Minimœn Cu[\-,atllæ CalcublÎ(JfJ Mi.'thud: Minimum CurV3tun: ~: ~~-::: ~~~~~~ird..r Nurth Emn Swf:u:c: Etlipljc1l~. Ca.sîn~ WaminR Mcth"d: Rule.. B....'<I FORMATION TOP DETAILS No, TVDPath MDPath Formation Start Dir 1/100' : 300' MD, 300'TVD Start Dir 1.5/100': 600' MD, 599.86'TVD Start Dir 25/100': 1000' MD, 997A9'TVD End Dir : 1799.93' MD, 1750' TVD ßt:ut Dir 4/100' : 2085.76' MD, 2000'TVD -500 '2 ~ 0 ~ +" :E 1:: ~ - ]000--~-'- :E g (/) -1500--'- -2000 0 500 I 2 3 4 5 6 7 8 9 10 II 12 13 14 15 ]6 17 18 19 20 21 22 23 24 2033.00 2058.00 2178.00 2568.00 2768.00 3088.00 3458.00 3508.00 3873.00 4588.00 4648.00 4708.00 4763.00 4823.00 4848.00 4888.00 4983.00 5033.00 5073.00 5108.00 5163.00 5238.00 5273.00 5323.00 2123.78 2152.98 2298.83 2838A8 3121.13 3573.36 4096.25 4166.91 4682.74 5641.56 5709.13 5775.18 5834.59 5898.34 5924.62 5966A6 6065.80 6118.08 6159.91 6196.51 6254.02 6332A5 6369.05 6421.34 PermaITost SV5 SV4 SV3 SV2 SVI UG4 UG4A UG3 Ma Mbl Mb2 Me Na Nb Ne OA OBa OBb OBe OBd OBe OBf Base OBf 1500 W est( - )lEast( +) [ 500ft/in] SURVEY PROGRAM Depth Fm Depth T" Sur\'eylPI:m Plan: W-211 wp03 (W-21 l/Plan W-211) Tool Date: 2/28/2002 Created By: Ken Allen Checked : Date: 83.00 1000.00 P1annat W-211 "pI! VI 1000.00 653636 P1annat W-211 "pI! VI CB-GYRO-SS MWD Reviewed: Date: WELL DETAILS Name +NI-S +El-W Nordring Easting Latitude Longitude Sial W-211 215631 [901.75 5959377.88 611789.04 70"17'52,71IN 149°OS'40,906W NlA TARGET DETAIlS - 1VD +NI-S +El-W J%r1hio¡! Easting Shape W-211 Nb 4858.00 -1498.05 2583.90 595791856 614394.72 Cin:le {Radiu;: 1(0) W-211 OBa 5033.00 -1526.61 2629.15 5957890.67 61444038 Polygon W-21l TD 5433.00 -1591.89 273255 5957826.95 614544.73 Circle (Radius: 1(0) SECTION DEI AILS See MD Ine Azi TVD +N/-S +FJ-W DLeg TFaee VSee Target I 83.00 0.00 0.00 83.00 0.00 0.00 0.00 0.00 0.00 2 300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 3 600.00 3.00 120,02 599.86 -3.93 6.80 1.00 120.02 7.85 4 1000.00 9.00 120.02 997A9 -24.84 42.98 1.50 0.00 49.64 5 1799.93 29.00 120.02 1750.00 -154.47 267.34 2.50 0.00 308.75 6 2085.76 29.00 120.02 2000.00 -223.80 387.32 0.00 0.00 447.33 7 2484.76 44.96 120.02 2317.71 -34350 594A6 4.00 0.00 686.56 8 5235.55 44.96 120.02 4264.17 -1316.00 2277.43 0.00 0.00 2630.30 9 5935.09 17.00 122.38 4858.00 -1498.05 2583.90 4.00 178.53 2986.75 W-211 Nb 10 6118.08 17.00 122.38 5033.00 -1526.70 2629.08 0.00 0.00 3040.21 W-211 OB 11 6536.36 17.00 122.38 5433.00 -1592.19 2732.36 0.00 0.00 3162.42 W-211 ID- CASING DETAILS No. TVD MD Name Size 1 2663.00 2972.74 95/8" 9.625 2 5432.99 6536.35 7" 7.000 Start Dir 4/1 00' : 5235.55' MD, 4264.17'TVD End Dir : 5935.09' MD, 4858' TVD W-211 Nb '- W-211 OBa ~" All TVD depths are ssTVD plus 83' for RKBE. Ir! I ,I ¡P I I 1fP # #'~~~ ~~ wp03 I 3000 ) BP Amoco Planning Report - Geographic ") . . . .. , I3P ÄØ1oço . . PrUcjhQ6 Bay.. . .. FiBW'J=iad' . . Wi.211 ... .. PlänW~211 . Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level çòmp~ny: Field:'. .. Sitê: .. Well:.. . . W~ilp~itb: Field: PB W Pad TR-11-12 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 47.83 ft Site: Well: W-211 5957194.18 ft 609919.18 ft Surface Position: +N/-S 2156.31 ft Northing: 5959377.88 ft +E/-W 1901.75 ft Easting: 611789.04 ft Position Uncertainty: 0.00 ft Reference Point: +N/-S 2156.31 ft Northing: 5959377.88 ft +E/-W 1901.75 ft Easting: 611789.04 ft Measured Depth: 83.00 ft Vertical Depth: 83.00 ft Wellpath: Plan W-211 Current Datum: Magnetic Data: Field Strength: Vertical Section: Plan: W-211 wp03 Principal: Yes Plan Section Information MD Incl ft dég 83.00 0.00 300.00 0.00 600.00 3.00 1000.00 9.00 1799.93 29.00 2085.76 29.00 2484.76 44.96 5235.55 44.96 5935.09 17.00 6118.08 17.00 6536.36 17.00 Section 1: Start MD Incl ft deg 83.00 0.00 100.00 0.00 200.00 0.00 300.00 0.00 1 : 01 9/12/1988 00:00 6/5/2001 57470 nT Depth From (TVD) ft 0.00 Height 83.00 ft +N/-S ft 0.00 . . . . .. . . . . Datë:2/28/2002 .. , ., [ihïe: .15:53:38 . . . ÇQ"or4iri~~e(N'~)Il~fererice:'VV$II: VV,211. TrLie.Nor1h. VeÎ"tic~I(TV'»)Rêferericê:' 1.:91 T9/121t988 00:00 83.0. S.eêtiòn (YS) Refêrêriée: .. .. WeU(p.oON,O;OOE;120.23Aii) Plån: ... ..' . . .. . ,VV-2t1wp03 .. . . .. Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre BGGM2001 Latitude: Longitude: North Reference: Grid Convergence: 70 17 31.506 N 149 6 36.343 W True 0.84 deg Slot Name: Latitude: Longitude: 70 17 52.711 N 149 5 40.906 W Latitude: Longitude: Inclination: Azimuth: 70 17 52.711 N 149 5 40.906 W 0.00 deg 0.00 deg Drilled From: Tie-on Depth: Above System Datum: Declination: Mag Dip Angle: +E/-W ft 0.00 Well Ref. Point 0.00 ft Mean Sea Level' 26.43 deg 80.74 deg Direction deg 120.23 2/25/2002 1 From Well Ref. Point Date Composed: Version: Tied-to: Azim TVD +N/-S +E/~W DLS Build Turn TFO deg ft ft ft deg/1 OOft . deg/1 OOft deg/100ft deg 0.00 83.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 120.02 599.86 -3.93 6.80 1.00 1.00 0.00 120.02 120.02 997.49 -24.84 42.98 1.50 1.50 0.00 0.00 120.02 1750.00 -154.47 267.34 2.50 2.50 0.00 0.00 120.02 2000.00 -223.80 387.32 0.00 0.00 0.00 0.00 120.02 2317.71 -343.50 594.46 4.00 4.00 0.00 0.00 120.02 4264.17 -1316.00 2277.43 0.00 0.00 0.00 0.00 122.38 4858.00 -1498.05 2583.90 4.00 -4.00 0.34 178.53 122.38 5033.00 -1526.70 2629.08 0.00 0.00 0.00 0.00 122.38 5433.00 -1592.19 2732.36 0.00 0.00 0.00 0.00 Target W-211 Nb W-211 OBa W-211 TD Azim TVD +N/-S +E/- W VS DLS Build Turn TFO deg ft ft ft ft deg/100ft deg/10OO deg/10OO deg 0.00 83.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 ') BP Amoco Planning Report - Geographic ) . çoo,pany:. BPAmoco . Fiëïd: . PriJqhoeBåy Site: . PBW Pad. Well: WJ211. Wellpath:. . PlariW~2t1 Section 2: Start . .. .. . . . Date: >2/28/2002 , . Time: 15:53:38. . . rage: Cò-i>rdinaÜ~(NE)Jlefere~c~: VVéll:VV~21.1, rr~eNdrth . . YerticaI(TYJ)}:f{eferè(¡ce: ,. 1:ot 9/12/198800:0083;0. . . Section (VS) Rêfèrencê: .. VV~II(O.QON;O:00E:,120.23AZi) . Plan:.. ... . . . . .. VY~211Wp03. .. ... .... ., . ... .MD ft 400.00 500.00 600.00 Section 3: Start MD ft 700.00 800.00 900.00 1000.00 Section 4: Start ..MD ft 1100.00 1200.00 1300.00 1400.00 1500.00 1600.00 1700.00 1799.93 loci deg 1.00 2.00 3.00 .Incl deg 4.50 6.00 7.50 9.00 .Incl deg 11.50 14.00 16.50 19.00 21.50 24.00 26.50 29.00 Section 5: Start MD ft 1900.00 2000.00 2085.76 loci deg 29.00 29.00 29.00 Section 6: Start MD ft 2100.00 2200.00 2300.00 2400.00 2484.76 loci deg 29.57 33.57 37.57 41.57 44.96 Section 7: Start MD ft 2500.00 2600.00 2700.00 2800.00 2900.00 3000.00 3100.00 3200.00 3300.00 3400.00 3500.00 3600.00 3700.00 3800.00 3900.00 4000.00 loci deg 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 Azhn deg 120.02 120.02 120.02 . Azhh . . deg 120.02 120.02 120.02 120.02 AziriJ deg 120.02 120.02 120.02 120.02 120.02 120.02 120.02 120.02 Azlm deg 120.02 120.02 120.02 Azlm deg 120.02 120.02 120.02 120.02 120.02 Azlm deg 120.02 120.02 120.02 120.02 120.02 120.02 120.02 120.02 120.02 120.02 120.02 120.02 120.02 120.02 120.02 120.02 TVD.. ft 399.99 499.96 599.86 TVD. ft 699.64 799.22 898.52 997.49 TVD .ft 1095.89 1193.41 1289.88 1385.12 1478.93 1571.14 1661.58 1750.00 TVD ft 1837.52 1924.99 2000.00 . TVD ft 2012.42 2097.60 2178.93 2256.00 2317.71 TVD ft 2328.49 2399.25 2470.01 2540.77 2611.53 2682.29 2753.05 2823.81 2894.57 2965.33 3036.09 3106.85 3177.61 3248.37 3319.13 3389.89 +N/-S. . .ft -0.44 -1.75 -3.93 +N/.;S. ft -7.20 -11.78 -17.66 -24.84 +N/..S ft -33.74 -44.78 -57.94 -73.19 -90.51 -109.85 -131.19 -154.47 +N/-S ft -178.74 -203.00 -223.80 +N/;.S ft -227.28 -253.47 -282.57 -314.43 -343.50 +N/-S ft -348.89 -384.24 -419.59 -454.94 -490.30 -525.65 -561.00 -596.35 -631.70 -667.06 -702.41 -737.76 -773.11 -808.46 -843.82 -879.17 +E/~W . ft 0.76 3.02 6.80 +E/..W ft 12.46 20.39 30.56 42.98 +E/- W ft 58.39 77.49 100.27 126.66 156.63 190.11 227.04 267.34 +E/~W . .ft 309.35 351.32 387.32 +E/-W ft 393.35 438.67 489.03 544.17 594.46 +E/-W ft 603.78 664.97 726.15 787.33 848.51 909.69 970.88 1032.06 1093.24 1154.42 1215.61 1276.79 1337.97 1399.15 1460.33 1521.52 VS ft 0.87 3.49 7.85 VS ft 14.39 23.54 35.30 49.64 VS . ft 67.43 89.50 115.80 146.29 180.90 219.56 262.22 308.76 VS ft 357.27 405.75 447.33 VS ft 454.29 506.63 564.79 628.48 686.56 VS ft 697.33 767.99 838.65 909.31 979.97 1050.64 1121.30 1191.96 1262.62 1333.28 1403.94 1474.60 1545.26 1615.92 1686.58 1757.24 ., DL~ . ... .. Build. ... Turn. . deg/1 Q.Oft(jE~g!1QOft dag/100ft 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 bLSBuild .. Turn. ~êg/100ftdag/1 OÖftdêgl10OO . 1.50 1.50 0.00 1.50 1.50 0.00 1.50 1.50 0.00 1.50 1.50 0.00 DLS Build Turn . deg/100ft .deg/1 OQftdeg/10OO . 2.50 2.50 0.00 2.50 2.50 0.00 2.50 2.50 0.00 2.50 2.50 0.00 2.50 2.50 0.00 2.50 2.50 0.00 2.50 2.50 0.00 2.50 2.50 0.00 DLS Build Turn. . deg/1 OOft deg/100ft. degl1 000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 DLS Build TurD deg/100ft degl100ft deg/10OO 4.00 4.00 0.00 4.00 4.00 0.00 4.00 4.00 0.00 4.00 4.00 0.00 4.00 4.00 0.00 DLS Build Turn deg/1 00ftdeg/1 000 deg/10OO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ...TFO deg. 0.00 0.00 0.00 TFO deg 0.00 0.00 0.00 0.00 TFO deg. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TFO deg 0.00 0.00 0.00 TFO deg 0.00 0.00 0.00 0.00 0.00 TFO deg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ) BP Amoco Planning Report - Geographic ) . çó~pany;. SP Arnoco Field: . Prudhoe~aÿ ..Sitê:... .PBWPèd' Well: .. . W.;211 .. Wenþ~th:. PlanW.;211 Section 7: Start MD >ft 4100.00 4200.00 4300.00 4400.00 4500.00 4600.00 4700.00 4800.00 4900.00 5000.00 5100,00 5200.00 5235.55 Section 8: Start MD ft 5300.00 5400,00 5500.00 5600.00 5700.00 5800.00 5900.00 5935.09 Incl . deg 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 Incl d~g 42.38 38.38 34.39 30.39 26.39 22.40 18.40 17.00 Section 9: Start MD ft 6000.00 6100.00 6118.08 Incl deg 17.00 17.00 17.00 Section 10 : Start MD Incl ft deg 6200.00 17.00 6300.00 17.00 6400.00 17.00 6500.00 17.00 6536.36 17.00 Survey MD ft 83.00 100.00 200.00 300.00 400.00 500.00 600.00 700.00 800.00 900.00 1000.00 1100.00 Incl deg 0.00 0.00 0.00 0.00 1.00 2.00 3.00 4.50 6.00 7.50 9.00 11.50 Åzini . deg 120.02 120.02 120.02 120.02 120.02 120.02 120.02 120.02 120.02 120.02 120.02 120.02 120.02 Azini qeg 120.12 120.29 120.50 120.75 121.07 121.50 122.10 122,38 Azim deg 122.38 122.38 122.38 Azini deg 122.38 122.38 122.38 122.38 122.38 Azim deg 0.00 0.00 0.00 0.00 120.02 120.02 120.02 120.02 120.02 120.02 3460.65 3531.41 3602.17 3672.93 3743.69 3814.45 3885.21 3955.97 4026.73 4097.49 4168.25 4239.01 4264.17 TVD ft 4310.78 4386.94 4467.43 4551.86 4639.81 4730.87 4824.58 4858.00 TVD. ft 4920.07 5015.70 5033.00 TVD ft 5111.34 5206.97 5302.60 5398.23 5433.00 TVD ft 83.00 100.00 200.00 300.00 399.99 499.96 599.86 699.64 799.22 898.52 120.02 997.49 120.02 1095.89 +Nl~S .ft -914.52 -949.87 -985.22 -1020.58 -1055.93 -1091.28 -1126.63 -1161.98 -1197.34 -1232.69 -1268.04 -1303.39 -1316.00 +Nl-S ft -1338.30 -1370.88 -1400.88 -1428.16 -1452.57 -1474.01 -1492.36 -1498.05 +Nl~S ft -1508.21 -1523.87 -1526.70 +N/-S ft -1539.53 -1555.18 -1570.84 -1586.50 -1592.19 +Nl-S ft 0.00 0.00 0.00 0.00 -0.44 -1.75 -3.93 -7.20 -11.78 -17.66 -24.84 -33.74 .. . . Date;.. .... 2128/2002 ... . .. ,Time: .. 15:53:38.... . Co~otdi~~t~(N~)l{derel1ee: .YVelJ:\IV~2t1; True North Vertiea.1 (TVJ»J{eferênte: .1':ot 9/12/1988 Oq:P083:0 Settion(VS).Referënce:. ., Well(O.OONI()~O()E:,120.23Aii) . Plan: . .. . ....... .W~~11wp03'.. .. +E/. W ft 1582.70 1643.88 1705.06 1766.24 1827.43 1888.61 1949.79 2010.97 2072.16 2133.34 2194.52 2255.70 2277 .43 +E/-W ft 2315.94 2371.93 2423.09 2469.17 2509.96 2545.26 2574.88 2583.90 +El~W ft 2599.93 2624.62 2629,08 +El-W ft 2649.31 2674.00 2698.69 2723.38 2732.36 +El- W ft 0.00 0.00 0.00 0.00 0.76 VS ft 1827.90 1898.57 1969.23 2039.89 2110.55 2181.21 2251.87 2322.53 2393.19 2463.85 2534.51 2605.17 2630.30 VS ft 2674.80 2739.57 2798.88 2852.43 2899.97 2941.25 2976.09 2986.75 VS ft. 3005.71 3034.93 3040.21 VS ft 3064.14 3093.36 3122.57 3151.79 3162.41 Map Northing ft 5959377.88 5959377.88 5959377.88 5959377.88 5959377.45 . DUS. .. Bund... Turn . qeg/1:00ftdeg/1 qOft cI~g/tOOO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 . DLS .. Build. . Turn deg/100ft dM/100ft .deg/1 OOft 4.00 -4.00 0.15 4.00 -4.00 0.17 4.00 -4.00 0.21 4.00 -4.00 0.25 4.00 -4.00 0.32 4.00 -4.00 0.43 4.00 -3.99 0.60 4.00 -3.99 0.79 DLS Build . Turn deg/100ft deg/10Oft deg/10OO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 DLS Build TUrD deg/1 OOOdeg/1 000 deg/10OO 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Map Easting ft 611789.04 611789.04 611789.04 611789.04 611789.80 TFQ deg 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 . TFO deg 178.53 178.46 178.33 178.16 177.95 177.66 177.27 176.70 TFO deg 0.00 0.00 0.00 TFO deg 0.00 0.00 0.00 0.00 0.00 <-- Latitude--> <-.,. . Longitude.. --> Deg Min See Deg Min Sec 70 17 52.711 N 149 5 40.906 W 70 17 52.711 N 149 5 40.906 W 70 17 52.711 N 149 5 40.906 W 70 17 52.711 N 149 5 40.906 W 70 17 52.707 N 149 5 40.884 W 3.02 5959376.18 611792.09 6.80 5959374.05 611795.90 12.46 5959370.86 611801.61 20.39 5959366.41 611809.60 30.56 5959360.68 611819.86 70 17 52.694 N 149 5 40.818 W 70 17 52.673 N 149 5 40.708 W 70 17 52.640 N 149 5 40.543 W 70 17 52.595 N 149 5 40.312 W 70 17 52.538 N 149 5 40.015 W 70 17 52.467 N 149 5 39.653 W 70 17 52.379 N 149 5 39.204 W 42.98 5959353.68 611832.38 58.39 5959345.01 611847.92 C()riJpany: Field:: . Site: : ..Well:'... . Wellpatl1:. . Survey 1200.00 1300.00 1400.00 1500.00 1600.00 1700.00 1799.93 1900.00 2000.00 2085.76 2100.00 2200.00 2300.00 2400.00 2484.76 2500.00 2600.00 2700.00 2800.00 2900.00 3000.00 3100.00 3200.00 3300.00 3400.00 3500.00 3600.00 3700.00 .. BPAi'noco . PrudhØø: Bay PBWPad W-211 . Plan W.;211 . Iucl deg 14.00 16.50 19.00 21.50 24.00 26.50 29.00 29.00 29.00 29.00 29.57 33.57 37.57 41.57 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 3800.00 44.96 3900.00 44.96 4000.00 44.96 4100.00 44.96 4200.00 44.96 4300.00 4400.00 4500.00 4600.00 4700.00 4800.00 4900.00 5000.00 5100.00 5200.00 5235.55 5300.00 5400.00 5500.00 5600.00 5700.00 5800.00 5900.00 5935.09 6000.00 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 44.96 42.38 38.38 34.39 30.39 26.39 22.40 18.40 17.00 17.00 ) BP Amoco Planning Report - Geographic 120.02 120.02 120.02 TVI> .ft. . 1193.41 1289.88 1385.12 120.02 1478.93 120.02 1571.14 120.02 1661.58 120.02 1750.00 120.02 1837.52 120.02 1924.99 120.02 2000.00 120.02 2012.42 120.02 2097.60 120.02 2178.93 120.02 2256.00 120.02 2317.71 120.02 2328.49 120.02 2399.25 120.02 2470.01 120.02 2540.77 120.02 2611.53 120.02 2682.29 120.02 2753.05 120.02 2823.81 120.02 2894.57 120.02 2965.33 120.02 3036.09 120.02 3106.85 120.02 3177.61 120.02 ~248.37 120.02 3319.13 120.02 3389.89 120.02 3460.65 120.02 3531.41 D~te:.' 2/28/2002.... .,. .... Time: .: 15:53:38 . ~~ge: . Qô~rdinate(lS;E)Rçtêr~nc~:Well:W~211; True. Nqrth, . . VertiCäl(1tVD)l{ef~rêncë:..' 1 :Ot9/121198800:008~;0' . .Sêdìôu(VS) Reference: . Well(Ð.'OON;O~OOE;120;23AZi). Pbm:. ' ..... . .. W-211 wpþ3 . .: .. . . .: . M:åp Eastìög. . ft . 611867.18 611890.15 611916.76 -44.78 -57.94 -73.19 Måp . . Northing. . t't . 5959334.26 5959321.44 5959306.59 77 .49 100.27 126.66 -90.51 -109.85 -131.19 -154.47 -178.74 -203.00 -223.80 -227.28 -253.47 -282.57 156.63 5959289.72 611946.98 190.11 5959270.88 611980.74 227.04 5959250.09 612017.99 267.34 5959227.42 612058.63 309.35 5959203.77 612100.98 351.32 5959180.15 612143.31 387.32 5959159.89 612179.61 393.35 5959156.49 612185.69 438.67 5959130.98 612231.40 489.03 5959102.64 612282.17 -314.43 -343.50 -348.89 -384.24 -419.59 544.17 5959071.60 612337.78 594.46 5959043.29 612388.49 603.78 5959038.04 612397.89 664.97 5959003.61 612459.59 726.15 5958969.17 612521.29 -454.94 787.33 5958934.74 612582.98 -490.30 848.51 5958900.30 612644.68 -525.65 909.69 5958865.87 612706.37 -561.00 970.88 5958831.43 612768.07 -596.35 1032.06 5958797.00 612829.77 -631.70 1093.24 5958762.56 612891.46 -667.06 1154.425958728.13 612953.16 -702.41 1215.61 5958693.69 613014.85 -737.76 1276.79 5958659.26 613076.55 -773.11 1337.97 5958624.82 613138.25 -808.46 1399.15 5958590.39 613199.94 -843.82 1460.33 5958555.95 613261.64 -879.17 1521.52 5958521.52 613323.33 -914.52 1582.70 5958487.08 613385.03 -949.87 1643.88 5958452.65 613446.73 120.02 3602.17 -985.22 1705.06 5958418.21 613508.42 120.02 3672.93 -1020.58 1766.24 5958383.78 613570.12 120.02 3743.69 -1055.93 1827.43 5958349.34 613631.81 120.02 3814.45 -1091.28 1888.61 5958314.91 613693.51 120.02 3885.21 -1126.63 1949.79 5958280.47 613755.21 120.02 3955.97 -1161.98 2010.97 5958246.04 613816.90 120.02 4026.73 -1197.34 2072.16 5958211.60 613878.60 120.02 4097.49 -1232.69 2133.34 5958177.17 613940.29 120.02 4168.25 -1268.04 2194.52 5958142.73 614001.99 120.02 4239.01 -1303.39 2255.70 5958108.30 614063.69 120.02 4264.17 -1316.00 2277.43 5958096.01 614085.60 120.12 4310.78 -1338.30 2315.94 5958074.29 614124.43 120.29 4386.94 -1370.88 2371.93 5958042.55 614180.89 120.50 4467.43 -1400.88 2423.09 5958013.31 614232.49 120.75 4551.86 -1428.16 2469.17 5957986.73 614278.97 121.07 4639.81 -1452.57 2509.96 5957962.93 614320.12 121.50 4730.87 -1474.01 2545.26 5957942.02 614355.72 122.10 4824.58 -1492.36 2574.88 5957924.12 614385.61 122.38 4858.00 -1498.05 2583.90 5957918.56 614394.71 122.38 4920.07 -1508.21 2599.93 5957908.63 614410.89 ..~~.<Låtitúde~-->... ~~"'I.Ø~gitu~e-.-~.. peg Miô' . See . Degl\iil1Sec .. . 70 17 52.271 N 149 5 38.647 W 70 17 52.141 N 149 5 37.984 W 70 17 51.991 N 149 5 37.214 W 70 17 51.821 N 149 5 36.341 W 70 17 51.631 N 149 5 35.365 W 70 17 51.421 N 149 5 34.288 W 70 17 51.192 N 149 5 33.113 W 70 17 50.953 N 149 5 31.889 W 70 17 50.715 N 149 5 30.665 W 70 17 50.510 N 149 5 29.616 W 70 17 50.476 N 149 5 29.440 W 70 17 50.218 N 149 5 28.119 W 70 17 49.932 N 149 5 26.652 W 70 17 49.619 N 149 5 25.044 W 70 17 49.333 N 149 5 23.579 W 70 17 49.280 N 149 5 23.307 W 70 17 48.932 N 149 5 21.523 W 70 17 48.584 N 149 5 19.740 W 70 17 48.237 N 149 5 17.957 W 70 17 47.889 N 149 5 16.174 W 70 17 47.541 N 149 5 14.390 W 70 17 47.193 N 149 5 12.607 W 70 17 46.846 N 149 5 10.824 W 70 17 46.498 N 149 5 9.041 W 70 17 46.150 N 149 5 7.258 W 70 17 45.802 N 149 5 5.475 W 70 17 45.454 N 149 5 3.691 W 70 17 45.107 N 149 5 1.908 W 70 17 44.759 N 149 5 0.125 W 70 17 44.411 N 149 4 58.342 W 70 17 44.063 N 149 4 56.559 W 70 17 43.715 N 149 4 54.776 W 70 17 43.368 N 149 4 52.993 W 70 17 43.020 N 149 4 51.210 W 70 17 42.672 N 149 4 49.427 W 70 17 42.324 N 149 4 47.644 W 70 17 41.976 N 149 4 45.861 W 70 17 41.628 N 149 4 44.078 W 70 17 41.281 N 149 4 42.295 W 70 17 40.933 N 149 4 40.512 W 70 17 40.585 N 149 4 38.729 W 70 17 40.237 N 149 4 36.947 W 70 17 39.889 N 149 4 35.164 W 70 17 39.765 N 149 4 34.531 W 70 17 39.546 N 149 4 33.408 W 70 17 39.225 N 149 4 31.777 W 70 17 38.930 N 149 4 30.286 W 70 17 38.661 N 149 4 28.943 W 70 17 38.421 N 149 4 27.755 W 70 17 38.210 N 149 4 26.726 W 70 17 38.030 N 149 4 25.863 W 70 17 37.974 N 149 4 25.600 W 70 17 37.874 N 149 4 25.133 W BP Amoco Planning Report - Geographic ) ) , ço~pany: Field: . Sitê: . \V~II: Wellpath: Survey .. BP Amoco. . . prucJhoe ,Bay . PBWPad. . Wl211 ... Plan W-211 ... .. .. . . . DatêC2/28/2002 . .. . "Tilrie: 15:53:38 ., . .. . Co,;ordinate(N~) R~fer~l1'c~:VVØH;VV+211,. True Nor;th. . . . Verti(ål(TVD)R~(erencë: .T;'.Ot9112/198800:0083~O .. . SeCtit>n(VS)R;eferèòce: . Wen (O.OONIO~OOE,120.23Azi) . Plan: . . . . . . W~211wp03.. . .... ..,.... . ¡>a.g(!: . $... .l\1~P M~p or;:':":;~LatitUde ,...:~.. <7~ Lo~~W~Øe7 MD loCi . Northillg Eastiög .l)egl\1i~Sec I)eg Mil1' ..Sec ft (jag . ft . . ft 6100.00 17.00 122.38 5015.70 -1523.87 2624.62 5957893.35 614435.81 70 17 37.720 N 149 4 24.414 W 6118.08 17.00 122.38 5033.00 -1526.70 2629.08 5957890.59 614440.31 70 17 37.692 N 149 4 24.284 W 6200.00 17.00 122.38 5111.34 -1539.53 2649.31 5957878.06 614460.73 70 17 37.566 N 149 4 23.695 W 6300.00 17.00 122.38 5206.97 -1555.18 2674.00 5957862.77 614485.64 70 17 37.411 N 149 4 22.975 W 6400.00 17.00 122.38 5302.60 -1570.84 2698.69 5957847.49 614510.56 70 17 37.257 N 149 4 22.256 W 6500.00 17.00 122.38 5398.23 -1586.50 2723.38 5957832.20 614535.48 70 17 37.103 N 149 4 21.536 W 6536.36 17.00 122.38 5433.00 -1592.19 2732.36 5957826.64 614544.55 70 17 37.047 N 149 4 21.275 W ) ') TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTERlPARAGRAPHS TO BEINCLUDEDINT~SNßTTALLETTER /l¿?t WELL NAME ?<J '- 2// CHECK 1 ST ANDARD LETTER DEVELOPMENT v DEVELOPMENT REDRILL EXPLORATION INJECTION WELL INJECTION WELL REDRILL CHECK WHAT APPLIES ADD-ONS (OPTIONS) MULTI LATERAL (If api number last two (2) digits are between 60-(9) Pll.,OT HOLE (PH) . ~NULMD~AL , íLJ NO ANNULAR DISPOSAL L-> YES ANNULAR DISPOSAL THIS WELL' "CLUE" The permit is for a new wellbore segment of existing weD -----' Permit No, . API No. . " Production should continue to be reported as a function of the original API number stated above. . In accordance with 2.0 AAC 25.005(1), all r~ords, data and logs acquired for the pilot hole must be clearly . differentiated in both name (name on permit plus PH) and API number (50 ..70/80) from . records, data and logs acquired for wel~(n8:me on permit). Annular disposal has ~ot been requested. . . Annular Disposal, of drilling wastes will not be approved. . . Annular Disposal of drilling wastes will not be approved... DISPOSAL INTO OTHER Please note that an disposal of fluids generated... . ANNULUS L-> YES + SP ACING EXCEPTION Templates are located m drive\jody\templates Enclosed is the approved application for permit to drill the above referenced well. The permit is approved ,sùbject to full compliance with 20 AAC 25.055. Approval to peñorate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Companv Name) will assume the liability of any protest to the spacing exception that may occur. WELL PERMIT CHECKLIST COMPANY ß jJ )( WELL NAME?.ß I d ú j - 2- / / FIELD & POOL hc.¡Ó/C:.ð INITCLASS /Je,;v /"'0/7 ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . 2. Lease number appropriate. . . . . . . . . . . . . . . . . . . 3. Unique well name and number. .. . . . . . . . . . . . . . . . 4. Well located in a defined pool.. . . . . . . . . . . . . . . . . 5. Well located proper distance from drilling unit boundary. . . . 6. Well located proper distance from other wells.. . . . . . . . . 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . 9. Operator only affected party.. . . . . . . . . . . . . . . . . . 10. Operator has appropriate bond in force. . . . . . . . . . . . . 11. Permit can be issued without conservation order. . . . . . . . !)fER ~9'AJJ 12. Permit can be issued without administrative approval.. . . . . rr. .?¡¿¿¡ ð7 --' 13. Can permit be approved before 15-day wait.. . . . . . . . . . ENGINEERING 14. Conductor string provided. . . . . . . . . . . . . . . . . . . 15. Surface casing protects all known USDWs. . . . . . . . . . . 16. CMT vol adequate to circulate on conductor & surf csg. . . . . 17. CMT vol adequate to tie-in long string to surf csg. . . . . . . . 18. CMT will cover all known productive horizons. . . . . . . . . . 19. Casing designs adequate for C, T, B & permafrost. . . . . . . 20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . 21. If a re-drill, has a 10-403 for abandonment been approved. . . 22. Adequate wellbore separation proposed.. . . . . . . . . . . . 23. If diverter required, does it meet regulations. . . . . . . . . . 24. Drilling fluid program schematic & equip list adequate. . . . . 25. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . APP~ DATE 26. BOPE press rating appropriate; test to '35'00 psig. WGf\- ;12.1(~ l 27. Choke manifold complies w/API RP-53 (May 84). . . . . . . . J'~ '3.1 . 28. Work will occur without operation shutdown. . . . . . " . .. ~ H{ t ~ 't( "O~. 29. Is presence of H2S gas probable.. . . . . . . . . , , . . . . . GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures. . . . . 31. Data presented on potential overpressure zones. . . . . . . 32. Seismic analysis of shallow gas zones. . . . . . . . . . . . . ~PR - ~TlZ 33. Seabed condition survey (if off-shore). . . . . . . . . . . . . t<!J -~..7f}'¡ ð z.. 34. Contact name/phone for weekly progress reports [exploratory 0 ANNULAR DISPOSAL 35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zone; . . . . . . . (B) will not contaminate freshwater; or cause drilling waste. .. to surface; (C) will not impair mechanical integrity of the well used for disposal; Y N (D) will not damage producing formation or impair recovery from a Y N pool; and (E) will not circumvent 20 AAC 25.252 or 20 MC 25.412. Y N GEOLOGY: ENGINEERING: UIC/Annular: COMMISSION: R~¿ TEM~ COT SFD- WGA VJGJr' DTS () =v 21/0 <- JMH. APPR DATE G: \geology\templates \checklist. doc PROGRAM: Exp - Dev,)<Redrll - Serv - Wellbore seg - Ann. disposal para req - GEOL AREA?' 1 ('") UNIT# //6. (~ ON/OFF SHORE ÒA) œ~ !ltj ~:~ ~ ;:''/ "jpß 7i dc- ~ ~----' /~ - M é"~;"/ ¿,,4 N/,/¿ N N N Y N N N I to N 'to ~ e fa . ~N ~ . @~. o~t,( ~CP,ç. ~ ~ 1~Æ 1:1 ~ ~- êZ (<!~{ t<f¡?~L : ~z-', £~ Ms(J = I ~ Z5 ý'v<. yI1a L C $<;) .þ j t- ~ %00 f r.-:. .. yáj Y N Y Y Y N Y N ;.L ClM.Ytk d:t sf/os,) rttiAf)'!,Pj. Comments/Instructions: / fJ~k.rl/~ ~~ ~ :d.wt aÞU- r/'lf ( H 205545 DATE 02/15/02 CHECK NO. 00205545 DATE INVOICE I CREDIT MEMO DESCRIPTION GROSS VENDOR DISCOUNT ALASKAOILA NET 00 021302 CK021302N PYMT CO,..1t1ENTS: HANDLING INST: 100.00 100.00 Permit to Drill ~ee S/H - Sandra Ste1Jman X4750 -..~.....~"", w,'J-;\\ THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. TOTAL ~ 100. 00 100.00 BP EXPLORATION, (ALASKA) INC. P.O. BOX 196612 ANCHORAGE, ALASKA 99519-6612 FIRST NATIONAL BANK OF ASHLAND AN AFFlUATE OF NATIONAL CITY BANK CLEVELAND, OHIO No. H 205545 CONSOLIDATED COMMERCIAL ACCOUNT 56-389 412 00205545 -' PAY ONE HUNDRED & 00/100************************************* US DOLLAR DATE 02/15/02 AMOUNT $100.00 To The ORDER Of ALASKA OIL AND GAS CONSERVATION COMMISSION 333 WEST 7TH AVENUE SUITE 100 ANCHORAGE NOTVAUDAFTER 120 DAYS \( . ..1; . .J. . r1A- ... ~ f?~.~'~'~ X-~~ AK 99501 "I 20 5 5 ~ 5 "I I: 0 ~ . 2 0 ~ B ~ 5 I: 00 B ~ ~ . g "I ) ') Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. . To improve the readability of the Well History file and to simplify finding information. information of this nature is accumulated at the end of the file under APPEN.DIX. No special effort has been made to chronologically organize this category of information. ) ) Sperry-Sun Drilling Services LIS Scan Utility $Revi.sion: 3 $ LisLib $Revision: 4 $ Mon Aug 05 08:17:12 2002 Reel !-leader Service name. ......., ....LISTPE Da t e . . . . . . . . . . . . . . . . . . . . . 02/08/05 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name..... ...........UNKNOWN Continuation Number......Ol Previous Reel Name.......UNKNOWN Comments. . . . . . . . . . . . . . . . . STS LIS Tape Header Service name.............LISTPE Da t e. . . , . . . . . . . . . . . . . . . . . 02/ 08/05 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name................UNKNOWN Continuation Number......01 Previous Tape Name.......UNKNOWN Comments. . . . . . . . . . . . . . . . . S'I'S LIS Physical EOF Comment Record TAPE HEADER Prudhoe Bay Unit MWD/MAD LOGS # WELL N1\ME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # O.OB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 AK-MW-22064 C.A. DEMOSKI L. VAUGHN # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: F£L: FWL: ELEVATION (FT FROM KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: MSL 0) # WELL CASING RECORD Writing Library. Scientific Technical Services Writing LibL.ary. Scientific Technical Services W-211 500292308000 BP Exploration Sperry Sun 05-AUG-02 (Alaska), Inc. MWD RUN 2 AK-MW-22064 T. MCGUIRE S. KOLSTAD 21 llN 12E 4404 1444 .00 84.92 50.92 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 20.000 80.0 9.625 2959.0 12.250 ~ RE!VIARKS: 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE STPI.TED. .., ìvIWD RUN 1 IS DIRECTIONPI.L ¡"nTH NATURAL G.A.MM.'\ PROBE (NGP) UTILIZING A SCINTILLATION DETECTOR. aOd-075 IOq7S ) 3. MWD RUN 2 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR) UTILIZING GEIGER MUELLER TUBE DETECTORS, ELEC'TROMAGNETIC WAVE RESISTIVITY PHASE 4 (EWR4), COMPENSATED NEUTRON POROSITY (CNP), AND STABILIZED LITHO-DENSITY (SLD). 4. GAMMA RAY (SGRC) IS LOGGED BEHIND CASING FROM 2890' MD, 2612' TVD TO 2959' MD, 2660' TVD. " :::J. DEPTH SHIFTING / CORRECTION WAIVED PER THE EMAIL FROM D. SCHNORR OF 04/24/02. MWD CONSIDERED PDC. ALL MWD LOG HEADER DATA RETAINS THE ORIGINAL DRILLER'S DEPTH REFERENCES. 6. MWD RUNS 1 & 2 REPRESENT WELL W-211 WITH API # 50-029-23080-00. THIS WELL REACHED A TOTAL DEPTH OF 6645' MD, 5543' TVD. SROP = SMOOTHED RATE OF PENETRATION SGRD = SMOOTHED GAMMA RAY SGRC = SMOOTHED GAMMA RAY COMBINED SEXP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( EXTRA SHALLOW SPACING) SESP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( SHALLOW SPACING) SEMP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( MIWIUM SPACING) SEDP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY ( DEEP SPACING) SFXE = SMOOTHED FORMATION EXPOSURE 'rrME SBD2 = SMOOTHED BULK DENSITY (LOW-COUNT BIN) SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN) SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW-COUNT BIN) SPSF = SMOOTHED COMPENSATED NEUTRON POROSITY (SANDSTONE MATRIX, FIXED HOLE SIZE) SNFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE SNNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE ENVIRONMENTAL PARAMETERS USED IN PROCESSING THE NEUTRON LOG DATA: HOLE SIZE: 8.75" MUD WEIGHT: 9.50 PPG MUD FILTRATE SALINITY: CHLORIDES FORMATION WATER SALINITY: FLUID DENSITY: G/CC MATRIX DENSITY: 9.30 - 300 - 400 PPM 20,000 PPM CHLORIDES 1.00 2.65 G/ce LITHOLOGY: SP,NDSTONE $ File Header Service name.............STSLIB.OOl Service Sub Level Name... Version Number..... ......1.0.0 Date of Generation.. .....02/08/05 Maximum Physical Record..65535 fi le Type................ 1.,0 Previous file Name... ....STSLI8.000 ) Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted and DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE Rap GR NCNT FCNT NPHI FET RPD RPM Rl?S Rl?X DRI-IO RHOB PEF $ 1 ) clipped curves; all bit runs merged. .5000 S'I'AR'I' DE PTH 115.0 122.0 2949.0 2949.0 2949.0 2949.0 2949.0 2949.0 2949.0 2949.0 2959.5 2959.5 2959.5 STOP DEPTH 6644.5 6607.0 6554.5 6554.5 6554.5 6599.5 6599.5 6599.5 6599.5 6599.5 6564.0 6564.0 6564.0 # BASELINE CURVE FOR SHIFTS: CURVE SHIF'r DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEl?TH --------- BASELINE DEPTH $ # MERGED PBU MWD MWD $ DATA SOURCE TOOL CODE BIT RUN NO MERGE TOP 1 115.0 2 2970. 5 MERGE BASE 2970. 0 6644.5 if REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type........... ..... ..0 Data Specification Block Type.. ...0 Logging Direction.................Down Optical log depth units...........Feet Data Reference Point..... .........Undefined Frame Spacing.... .... .............60 .1IN Max frames per record.............Undefined Absent value..................... .-999 Depth Units....................... Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset DEl?T FT 4 1 68 0 ROP MWD FT/H 4 1 68 4 GR MWD Al?I 4 1 68 8 RPX MWD OHMM 4 1 68 12 RPS MWD OHMM 4 1 68 16 RPM MWD OHMM 4 1 68 20 RPD MWD OHMM 4 1 68 24 FET MWD HR 4 1 68 28 NPHI MWD l?U-S 4 1 68 32 t"'CNT MWD Cl?30 4 1 68 36 NCNT MWD CP30 4 1 68 40 RHOB ¡V¡WD G/C¡V¡ 4 1 68 44 DRHO ¡V¡WD G/CM 4 1 68 48 l?E F MWD B/E 4 1 68 52 Channel 1 2 3 5 6 7 8 9 10 11 12 13 14 First Last Name Service Unit fv1in Max Mean Nsam Reading Readinq DEl?T [T 115 6644.5 3379.75 13060 115 6644.5 ROP r-.n^!D [TlH 1.5 1528.59 276.188 13060 115 6644.5 GR MWD .I-\l?I 15.37 134.9 68.9576 12971 122 6607 RPZ ¡v¡t'¡D OHHH 0.52 36.67 7.04422 7302 2949 6599.5 ~ ,I RPS MWD OHMM 0.14 67.95 7.12329 7302 2949 6599.5 RPM MWD OHMM 1. 32 2000 9.22556 7302 2949 6599.5 RPÙ MWD OHMM 1.4 2000 13.2142 7302 2949 6599.5 FET MWD HR 0.06 43.61 0.668688 7302 2949 6599.5 NPHI MWD PU-S 19.62 72.15 42.6042 7212 2949 6554.5 FCNT MWD CP30 402 819 519.102 7212 2949 6554.5 NCNT MWD CP30 2016 3608 2656.91 7212 2949 6554.5 RHOB MWD G/CM 1. 45 3.25 2.23878 7210 2959.5 6564 DRHO MWD G/CM -0.27 0.77 0.0814577 7210 2959.5 6564 PEF MWD B/E 0.8 8.08 2.62858 7210 2959.5 6564 First Reading For Entire File..........115 Last Reading For Entire F11e...........6644.5 File Trailer Service name.............STSLIB.OOl Service Sub Level Name... Version Number..... ......1.0.0 Date of Generation.......02/08/05 Maximum Physical Record..65535 File Type................ LO Next File Name....... ....STSLIB.002 Physical EOF file Header Service name.............STSLIB.002 Service Sub Level Name... Version Number..... .... ..1.0.0 Date of Generation.......02/08/05 Maximum Physical Record..65535 File Type................ LO Previous File Name.......STSLIB.OOl Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: H FILE SUMMARY VENDOR TOOL CODE ROP GR $ 2 header data for each bit run in separate files. 1 .5000 START DEPTH 115.0 122.0 STOP DEPTH 2970.0 2890.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TO DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: HA.'\IMUM ANGLE: 15-APR-02 Insite 4.05.5 3.30 Hemory 2970.0 .0 46.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE NGP NATUR.A.L G.A.HHA PROBE $ TOOL NUtvl8ER 011 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 12.250 2959.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPE.RATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: Spud 9.40 180.0 8.8 350 7.4 .000 .000 .000 .000 .0 74.2 .0 .0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): if REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction....... ....... ...Down Optical log depth units. ....... ...Feet Data Reference Point...... ........Undefined Frame Spacing.....................60 .1IN Max frames per record.. ... ........Undefined Absent value..................... .-999 Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam R(~p Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD010 FT!]-] 4 1 68 4 '/\ GR MWD010 API 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DE I?T FT 115 2970 1542.5 5711 115 2970 ROP MWD010 FT/H 2.6 1528.59 240.595 5711 11.5 2970 GR MWD010 API 21. 63 134.24 70.3036 5538 122 2890.5 First Reading For Entire File..........115 Last Reading For Entire File...........2970 File Trailer Service name.............STSLIB.002 Service Sub Level Name... Ve r s ion Nu mb e r. . . . . . . . . . . 1. 0 . 0 Date of Generation...... .02/08/05 Maximum Physical Record..65535 Fi 1 e Type................ LO Next File Name... ........STSLIB.003 Physical EOF File Header Service name.............STSLIB.OO3 Service Sub Level Name... Version Nunmer... ....... .1.0.0 Date of Generation...... .02/08/05 Maximum Physical Record..65535 File Type. ..... .... ..... .LO Previous File Name.......STSLIB.OO: Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR NCNT FCNT NPHI FET RPD RPM RPS RPX DRHO RHOB PEF ROP $ 3 ) header data for each bit run in separate files. 2 .5000 STAWf DEPTH 2891.0 2949.0 2949.0 2949.0 2949.0 2949.0 2949.0 2949.0 2949.0 2959.5 2959.5 2959.5 2970.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TO DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 CNP SLD $ STOP DEPTH 6607.0 6554.5 6554.5 6554.5 6599.5 6599.5 6599.5 6599.5 6599.5 6564.0 6564.0 6564.0 6644.5 BOTTOM) TOOL TYPE DUAL GAMMJ.\ RAY ELECTROMAG. RESIS. 4 COMPENSATED NEUTRON STABILIZED LITHO DEN # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (22M): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD C.I\IŒ AT MT: NEUTRON TOOL MATRIX: M}\TRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): RStvl}\RKS: $ 18-APR-02 Insite 4.05.5 66.37 Memory 6645.0 15.1 45.6 TOOL NUMBER PBOO144HWRGV6 PBOO144HWRGV6 PBOO147NL6 PBOO14 7NL6 8.750 Wate.r Based 9.40 45.0 8..8 700 7.2 3.200 2.483 1. 800 2.900 75.0 98.6 75.0 75.0 ) "\ J # Data Format Specification Record Data Record Type.................. (I Data Spec:Lfication Block Type..... (I Logging Direction.................Down Optical log depth units......... ..Feet Data Reference Point.. .... ...... ..Undefined Frame Spacing.....................60 .1IN Max frames per record.............Undefined Absent value...................... -999 Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . . Datum Speci. fication Block sub-type... 0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/I-! 4 1. 68 4 2 GR MWD020 API 4 1 68 8 3 RPX MWD020 OI-!MM 4 1 68 12 4 RPS MWD020 OHMM 4 1 68 16 5 RPM MWD020 OHMM 4 1. 68 20 6 RPD MWD020 OHMM 4 1 68 24 7 FET MWD020 HE 4 1 68 28 8 N PHI MWD020 PIJ-S 4 1. 68 32 9 rCNT MWD020 CP30 4 1 68 36 10 NCNT MWD020 CP30 4 1 68 40 11 RI-IOB MWD020 G/CM 4 1 68 44 12 DRHO MWD020 G/CM 4 1 68 48 13 PEF MWD020 B/E 4 1. 68 52 14 F.i.rst Last Name Se.r'vice Unit Min Max Mean Nsam Reading Reading DEPT rT 2891 6644.5 4767.75 "7508 2891 6644.5 Rap MWD020 FT/H 1.5 1046.57 303.848 7349 2970.5 6644.5 GR MWD020 API 15.37 134.9 67.9548 7433 2891 6607 RPX MWD020 OI-!MM 0.52 36.67 7.04422 7302 2949 6599.5 RPS MWD020 OHMM 0.14 67.95 7.12329 7302 2949 6599.5 RPM MWD020 OI-!MM 1. 32 2000 9.22556 7302 2949 6599.5 RPD MWD020 OHMM 1.4 2000 13.2142 7302 2949 6599.5 FET MWD020 HR 0.06 43.61 0.668688 7302 2949 6599.5 NPI-!I MWD020 pu-s 19.62 72. .1Ei 42.6042 7212 2949 6554.5 rCNT MWD020 CP30 402 8.19 519.102 7212 2949 6554.5 NCNT MWD020 CP30 2016 3608 2656.91 7212 2949 6554.5 RHOB MWDO.20 G/CM 1. 45 3.25 :2.23878 7210 2959.5 6564 DRHO MWD020 G/CM -0.27 0.77 0.0814577 7210 2959.5 6564 PEF MWD020 B/E 0.8 8.08 2.62858 7210 2959.5 6564 First Reading For Entire File..........2891 Last Reading For Entire File.. ... ... ...6644.5 File Trailer Service name.............STSLIB.003 Service Sub Level Name... Version Number...........1. O. (I Date of Generation.......02/08/05 Maximum Physical Record..65535 Fi 1 e Type................ LO Next File Name.. ... ..... .STSLIB.004 Physical EOF Tape Trailer Service name.... ...... ...LISTPE Da t e. . . . . . . . . . . . . . . . . . . . . 021 08/ 05 Oriqin. . . . . . . . . . . . . . . . . . . STS Tape Name.......... ......UNKNOWN Cc,ntinuation Number...... 01 Ne:~t Tape Name........... UNKNOWN Cc,mrnents................ .STS LIS Writing Library. Scienti fie Technical Servi,::e:3 ) Reel Trailer Service name............. LISTPE Da t e . . . . . . . . . . . . . . . . . . . . . 02/08/05 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name................UNKNOWN Continuation Number......Ol Next Reel Name...........UNKNOWN Comments.................STS LIS Physical EOF Physical EOF End Of LIS File Writing Library. ) Scientific Technical Services