Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout202-078 Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ¡- 0..0:1.- f) 1 ~Well History File Identifier DIGITAL DATA ¿ Diskettes, No. ~escan Needed OVERSIZED (Scannable) Organizing (doll"~) REJCAN 0/'.. Color items: ~ Grayscale items: 0 Poor Quality Originals: 0 Two~Sìded 0 Maps: Other items scannable by large scanner 0 Other, NofType 0 0 Other: OVERSIZED (Non-Scannable) NOTES: 0 Logs of various kinds BY: BEVERLY ROBIN VINCENT SHERY¿...~INDY , .0 Other DATE:/"" I Off Isl 1111-:0 BY: .f r ' ' . .A /) ,~~ DATE: , ~ rJt 151 rvf' I ~ + 1<3 = TOTAL PAGES L- g " I ' I ~ DATE:1' 6tf 151 vvvð ~ ~ 1+ (]' &:rI~? ~ etdd.rui PAGE COUNT MATCHES NUMBER IN SCANNING PRE~ARATION~ ~ES - NO BEVERLY ROBIN VINCENT SHERYL6>WINOY DATE''D IS" ólfSI jlN f BEVERLY ROBIN VINCENT SHERG,NOY Project Proofing Scanning Preparation I x 30 = c~ 0 BY: BEVERLY ROBIN VINCENT SHER~INDY Production Scanning Stage 1 PAGE COUNT FROM SCANNED FILE: BY: Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: - YES - NO BY: BEVERL Y ROBIN VINCENT SHERYL MARIA WINDY DATE: /s/ (SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALITY , GRAYSCALE OR COLOR IMAGES) ReScanned (in¡f!\'id¡~;.11 ¡ng" [:'.{!~r.i.11 ¡>trnlJthlJ} ,s r.,.) íJning cplnplp!ceJ) RESCANNED By"; BEVERLY ROBIN VINCENT SHERYL MARIA WINDY DATE: /s/ General Notes or Comments about this file: Quality Checked (d()lIc) 12110102Rev3NOTScanned.wpd e e MICROFilMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\CvrPgs _Inserts\Microfilm _ Marker.doc )(-C) . J ~k-~ DATA SUBMITTAL COMPLIANCE REPORT 6/1/2004 Permit to Drill 2020780 Well Name/No. PRUDHOE BAY UNIT X-35L 1 MD 15534 Completion Date 5/26/2002 TVD 8976 -------- "-- ---- - ---- -- - -- ------ ----- REQUIRED INFORMATION Mud Log No ----- ----------- ----------------~-- -~ DATA INFORMATION Types Electric or Other Logs Run: MWD, GR, RES Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number r.~~----~--- <Wõ C Name Induction/Resistivity L 11 040 See Notes ¡ Rpt ; ./ tÆD D : Rpt tX°g Directional Survey JditectionalSurvey Directional Survey Induction/Resistivity ----------~--~- Well Cores/Samples Information: Name Interval Start Stop ADDITIONAL INFORM~ION Well Cored? Y /ttJ Chips Received? c~ Analysis Received? ~. ----------~-- ------------- Comments: ------------- ----- .------------ Compliance Reviewed By: - ~ Operator BP EXPLORATION (ALASKA) INC 5r (4J. (t I1J z..U(}:t API No. 50-029-22436-60-00 Completion Status 1-01L Samples No Log Log Run Scale Media No I W 25 Blu 3 to 8 3 to 8 ¡vt. 025 Blu 3 to 8 Sent Received Daily History Received? Formation Tops Current Status 1-01L UIC N Directional Survey Yes (data taken from Logs Portion of Master Well Data Maint) Interval OH/ Start Stop CH Received Comments 13955 15505 Open 9/13/2002 13958 15533 Open 9/13/2002 LDWG Openhole edit of MWD / MAD data 13925 15534 Open 6/12/2002 Geodetic 13925 15534 Open 6/12/2002 13925 15534 Open 6/12/2002 13955 15505 Open 9/13/2002 Sample Set Number Comments C]/N 0N Date: - --" I j ~ ~C;-ð '-I ScblulDbepger Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 A TIN: Beth ~---- ~ Well W-22 W-36 X-35L 1 X-35L 1 X-35L 1 I ~~ - 1 ) [) / C¡<;?- 10' ~r)d-Oj i' -..J ,-." BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Job# Date Log Description 22364 RST -SIGMA 22365 RST -SIGMA 22263 OH EDIT MWD/MAD DATA 22263 MD VISION312-RESISTIVrTY 22263 TVD VISION312-RESISTIVITY 07/31/02 08/01/02 OS/24/02 OS/24/02 OS/24/02 RECEIVED SEP i 3 <002 Alaska 0í1 & Gas Cons. Commission Anchorage Blueline 09/03/02 NO. 2384 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Sepia Color Prints CD Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503~5711 A TIN: Beth Receive~ 0l1gr~ ) ) STATE OF ALASKA ) ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well i1 Oil 0 Gas 0 Suspended 0 Abandoned 0 Service 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 '. .' 4. L~ti~~~f;;~!~~~~~~c. 07, nON, R14E, UM ¡ GOï¡~~0í"1!'tì8~.. ~~¡ At top of productive interval ~ ç. 2..'- "62~ ë. .': ,.¡} 1118' SNL, 5084' WEL, SEC. 12. T10N, R13E. UM ~ 4 V§IFiW ~I t .l~.>:)'~} 2~~,t~~L~~~~ WEL, SEC.02, T10N, R13E, UM L~r,.i~i~~::Þ ~"J..:~t.\~_..~j!~~r! 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. KBE = 69.15' ADL 047472 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 5/18/2002 5/24/2002 5/26/2002 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 15534 8976 FT 15534 8976 FT i1 Yes 0 No 22. Type Electric or Other Logs Run MWD, GA, RES 23. CASING SIZE 20" 10-3/4" 7-5/8" 5-1/2" 3.1/2" x 3-3116" x 2-7/8" WT. PER FT. 91.5# 45.5# 29.7# 17# 9.5# 1 6.2# 6.16# Multilateral Classification of Service Well 7. Permit Number 202-078 8. API Number 50- 029-22436-60 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number X-35L 1 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 15. Water depth, if offshore 16. No. of Completions N/A MSL One 20. Depth where SSSV set 21. Thickness of Permafrost (Nipple) 2043' MD 1900' (Approx.) --r7 w ..:.:, J....-.., 1.3'9 7 { "1b GRADE H-40 NT80LHE NT95HS 13Cr80 L-80 CASING, LINER AND CEMENTING RECORD SETTING DEPTH HOLE Top BOTTOM SIZE CEMENTING RECORD 30' 110' 30" 260 sx Arctic Set (Approx.) 30' 3845' 13-1/2" 1112 sx PF 'E', 320 sx Class 'G' 27' 13949' 9-7/811 265 sx Class 'G' 13772' 13971' 6-3/4" 108 sx Class 'G' 13762' 15534' 3-3/411 Uncemented Slotted Liner 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 2-7/8" Slotted Liner MD TVD 14554' - 15503' 8969' - 8976' 27. Date First Production June 16. 2002 Date of Test Hours Tested 6/27/2002 4 25. SIZE 4-1/2",12.6#, 13Cr80 MD TVD 26. AMOUNT PULLED TUBING RECORD DEPTH SET (MD) 13777' PACKER SET (MD) 13717' ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 14043' Set Weatherford IBP Dual Check Valve 13982' Set Flo-By Whipstock 2000' Freeze Protected with 30 Bbls Crude PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) Gas Lift PRODUCTION FOR OIL-BBL TEST PERIOD 812 GAs-McF 1818 GAs-McF WATER-BBL 1788 WATER-BBL Flow Tubing Casing Pressure CALCULATED Press. 24-HoUR RATE OIL-BBL CHOKE SIZE 1760 OIL GRAVITY-API (CORR) GAS-OIL RATIO 2237 CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core C~t eEl \1 f D No core samples were taken. 28. Form 10-407 Rev. 07-01-80 UilGINAL JUL 1 5 2002 Alaska Oil & Gas Cons. GomffilSSlon /~ -- Anchorage {:,.. F R B 0 M S B F L JUL , 8 2l1Jfmit In Duplicate ) ) 29. Geologic Markers 30. Formation Tests Marker Name Measured Depth True Vertical Depth Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. Zone 48 14085' 89561 J'\ ['" ..'.. \i'~' M ',<Pi .." { ~.." ~ ¡ 'I¡.. - ~, ::"" ' u- r~~ If' \\ J , "I r' ¡-¡OJ') ",IUL J I.. L:. Alasl<a ŒI & Gas COilS. \il ;¡IO'" Anchorage 31. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Terrie Hubble ;{'~ J ~ Title Technical Assistant X-35L 1 202-078 Well Number Permit No. / Approval No. Date 07.IS.0~ Prepared By Name/Number: Terrie Hubble, 564-4628 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible. Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 OR\'~(""""r,r\~ t! . ~ ,,\' .. i .,,-: ' I \ ¡ ¡ \ .,i , " .. \.~: i ~ 'J -~'~ '- ) ) X-35L 1 Prudhoe Bay Unit 50-029-22436-60 202-078 Rig Accept: 05/15/02 Rig Spud: 05/18/02 Rig Release: OS/26/02 Nabors 3S PRE-RIG WORK 03/30/02 PREP FOR CTD. PPPOT-T PASSED. ALL LDS PASSED FUNCTION TEST. 03/31/02 MITOA TO 1000 PSI PASSED. PT MV AND WING VALVE TO 5000 PSI PASSED. PT SWAB TO 4720 PSI PASSED. 04/22/02 DRIFTED TUBING INTO LINER WITH A 20'/3.65" OD DUMMY WHIPSTOCK DRIFT TO 14111' AMS-SLM - HAD TO TAP DOWN IN SEVERAL SPOTS BETWEEN 10000' AND 11000' DUE TO DEVIATION? - E-LlNE MAY HAVE DIFFICUL TV RUNNING WHIPSTOCK BECAUSE TOOLS WOULD NOT FALL ON THEIR OWN. 04/23/02 SET CATCHER SUB, PULL S1'S 2,3,4,5,6. SET DGLV IN ST'S 6, 5, 4. AND 3. 04/24/02 SET DGLV IN ST # 2. CONDUCTED SUCCESSFUL MITIA. CATCHER SUB IN HOLE. MIT IA. PASSED MIT. LOST 100# IN 30 MIN. 04/25/02 PULLED CATCHER SUB. 04/26/02 ATTEMPT TO SET WEATHERFORD 3 318" IBP (WI CHECK VALVE) @ 14050'. PUMP FAILED IN LlNER- APPEARED TO BE A SHORT DOWNHOLE. LOST & REGAINED CCL MULTIPLE TIMES WHILE LOGGING INTO POSITION. SAT DOWN @ 13756' (TT) WHILE RIH, MULTIPLE ATTEMPS, ABLE TO GET DOWN. GO ON WEATHER STANDBY - UNABLE TO RIG DOWN TILL FOLLOWING MORNING. WELL LEFT SHUT IN AND FREEZE PROTECTED. 04/28/02 SET 3 318" WEATHERFORD IBP WITH DUAL CHECKS AT 14043' (CENTER OF ELEMENT AT 14050'). NOTE PLUG IS SET TO CHECK FROM ABOVE & ALLOW PRODUCTION FROM BELOW. IBP IS 14.3 OAL WI A 3.5" 'G' FN. NOTIFY PAD OP OF WELL STATUS - WELL FREEZE PROTECTED - OK TO POP. 05/12/02 ABORTED OPERATION. UNABLE TO MAKE IT BELOW 5300' WITH WHIPSTOCK DUE TO DEVIATION. POOH. WELL LEFT SHUT IN. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 5/15/2002 15:30 - 22:00 22:00 - 00:00 5/16/2002 00:00 - 02:30 02:30 ~ 05:30 05:30 ~ 06:30 06:30 ~ 07:00 07:00 - 12:30 12:30-14:00 14:00 - 14:30 14:30 ~ 15:30 15:30 - 16:30 16:30 - 19:00 19:00 ~ 20:00 5/17/2002 20:00 - 23:30 23:30 - 00:00 00:00-01:15 01:15 - 04:10 04:10 - 05:45 05:45 - 08: 15 08: 15 - 09:45 09:45 ~ 12:15 12:15 ~ 13:30 13:30 ~ 16:00 16:00 - 17:30 17:30 - 17:45 17:45 - 18:15 5/18/2002 18:15~21:40 21 :40 ~ 22:45 22:45 - 00:00 00:00 - 01 :20 01 :20 - 02:30 02:30 - 04:15 04:15 ~ 05:20 05:20 ~ 13:30 ) ') BP EXPLORATION Operations Summary Report X-35 X-35L 1 REENTER+COMPLETE NABORS NABORS 3S Task Code NPT Phase 6.50 MOB P 2.00 RIGU P 2.50 RIGU P 3.00 RIGU P 1.00 BOPSURP 0.50 BOPSUR P 5.50 BOPSUR P 1.50 KILL P 0.50 KILL P 1.00 KILL P 1.00 KILL 2.50 KILL 1.00 KILL 3.50 KILL P 0.50 STWHIP P 1.25 STWHIP P 2.92 STWHIP P 1.58 STWHIP N 2.50 STWHIP N 1.50 STWHIP N 2.50 STWHIP N 1.25 STWHIP N 2.50 STWHIP N 1.50 STWHIP N 0.25 STWHIP P 0.50 STWHIP P 3.42 STWHIP P 1.08 STWHIP P 1.25 STWHIP P 1.33 STWHIP P 1.17 STWHIP P 1.75 STWHIP P 1.08 STWHIP P 8.17 STWHIP P PRE PRE PRE PRE DECaMP DECaMP DECaMP DECaMP DECaMP DECaMP P P P DECaMP DECaMP DECaMP DECaMP WEXIT WEXIT WEXIT DFAL WEXIT DFAL WEXIT DFAL WEXIT DFAL WEXIT DFAL WEXIT DFAL WEXIT DFAL WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT Page.1 of6 Start: 5/15/2002 Rig Release: 5/26/2002 Rig Number: N3S Spud Date: 2/14/1994 End: 5/27/2002 Description of Operations Arrived to X pad. Spot rig and pits. Rigging up. Check tree cap for pressure. NIP tree cap. N/U adapter spool/BOPE/kill and choke line. Rig accepted at 22:00 Hook-up Koomey lines. Pressure up. Function test BOPE. Install lubricator. Pull BOPE stack over and align it. Measure stack. Set in cutting box. PT hardline to 4000 psi. RU for BOP test. Safety meeting. PT BOPE. Witness waived by AOGCC's John Crisp. Stab pipe. Pull TWC. WHP = 200 psi. Bring inj to floor. Install CTC. Pull and PT. MU stinger with 3.5" nozzle (BHA #1). Circulate methanol out of coil. Open master. RIH, bleeding WHP. Circulate bottoms up. Got back crude and gas. Lost 20 bls in 1 hour. POH. Have KCI back on surface. 2.6/2.3. OOH. M/U BHA #1. Continue making up BHA. RIH wlBaker whipstock. Pumping minimum rate. RIH to 14020'. Increase pump rate to 2.5 bpm. No apparent losses. Tie in. Not getting GR readings -- pegged out at 126 API units. Trouble shooting on surface. Don't want to cycle pumps down (to "reboot" MWD), for fear of setting whipstock if screws are sheared. POH. Stop at 8600'. GR working again. Re~log to confirm. RIH. GR stopped working again at 13000'. POOH Change out probe and FAIV. RIH. Attempt tie in log up at 2.7 BPM at starting at 14020'. GR still pegged out at 126 units (scale???). Try PUH. Still pegged at 13600', 13300', and 13000'. RIH. Tag IBP at 14046' down. PUH to full string weight = 14038' up. Correct depth (+5') to 14043'. PUH to whipstock setting depth 13982' (TOW at 13970'). SD pump and bleed to attempt "reboot" of MWD. Bring pump back up and pressured up -~ must have sheared screws while logging. Pressure to 4000 psi and shear setting tool. Stack 10k down. Whipstock set with top at 13970' and 28R orientation (no RA tag). POOH. OOH. LD setting tools. P/U milling assembly. RIH wlmilling assembly. RIH. Corrected -2' at flag. Tag XN nipple @13760'. Mill thru (1 stall). Tag whipstock pinch point @ 13967'. Several stalls getting started. Then milled 0.6' in 1 hour. 2.6/1600. Continue time milling to 13968.3' with 2 stalls. Mill 2.7/1600 FS. Bump in CTP at 1397 4' ~- maybe popped out here. Mill to 13974.5' and stall. Printed: 5/28/2002 11 :20:45 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: ') ) BP EXPLORATION Operations Summary Report X-35 X-35L 1 REENTER+COMPLETE NABORS NABORS 3S 5/18/2002 5/19/2002 5/20/2002 13:30 - 15:30 15:30 - 16:00 16:00 - 18:15 18:15 -18:45 18:45 - 19:30 19:30 - 22:00 22:00 - 00:00 00:00 - 01 :30 01 :30 - 03:45 03:45 ~ 04:30 04:30 - 05:00 05:00 - 05:15 05:15 - 08:15 08: 15 - 08:30 08:30 - 10:15 10:15-12:30 12:30 - 14:00 14:00 ~ 14:45 14:45 ~ 18:30 18:30 - 19:30 19:30 - 20:15 20:15 - 20:30 20:30 ~ 21 :30 21 :30 - 22:45 22:45 - 00:00 00:00 ~ 00:45 00:45 - 02:30 02:30 - 03:30 03:30 - 04:00 04:00 - 06:00 06:00 - 07:00 07:00 - 10:30 1 0:30 ~ 13:00 2.00 STWHIP P 0.50 STWHIP P 2.25 STWHIP P 0.50 STWHIP P 0.75 STWHIP P 2.50 STWHIP P 2.00 STWHIP P 1.50 DRILL P 2.25 DRILL P 0.75 DRILL P 0.50 DRILL P 0.25 DRILL P 3.00 DRILL P 0.25 DRILL P 1.75 DRILL N 2.25 DRILL P 1.50 DRILL P 0.75 DRILL P 3.75 DRILL P 1.00 DRILL 0.75 DRILL 0.25 DRILL 1.00 DRILL 1.25 DRILL 1.25 DRILL P 0.75 DRILL P 1.75 DRILL N 1.00 DRILL P 0.50 DRILL 2.00 DRILL 1.00 DRILL 3.50 DRILL 2.50 DRILL Phase WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT WEXIT PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 DPRB PROD1 PROD1 PROD1 PROD1 PROD1 P P P P N PROD1 PROD1 PROD1 PROD1 DFAL PROD1 PROD1 PROD1 DFAL PROD1 PROD1 P P P N N PROD1 PROD1 PROD1 DPRB PROD1 DPRB PROD1 Page 2 of6 Start: 5/15/2002 Rig Release: 5/26/2002 Rig Number: N3S Spud Date: 2/14/1994 End: 5/27/2002 Descri ption of Operations Mill formation. Displace well to new Flo-Pro. Mill to 13984'. Ream and backream window. Clean ~~ no motor work. Dry tag 13984'. Corrected window 13971' ~ 13978'. Corrected TD 13988'. POOH. 44k off btm with mud, vs 60k with KCL water. Crew change safety meeting. LD milling BHA. Mill undergauge (3.73") but string mill in gauge (3.8"). Cut 1 00' of coil. P/U Drilling assembly. Pull test. RIH w/drilling assembly. RIH. Tag TD. Corrected ~10'. Drill ahead. 2.6/3040/10L. Drill to 14030'. PU gamma marker on the fly looks like we're 3' shallow -- did not correct. Drill. 2.6/3020/20R. ROP 27 ftlhr. Drill to 14048' Building too agressive. Orient to drop angle. Drill ahead 2.6/3100/92R. Orienting to 64L. Drill ahead 2.6/2990/76L. Break at 14075' -- top of Ivishak. ROP 80 FPH. Started losing fluid about 14110', Drill ahead 2.8/1.9 -- improved to 2.8/2.2. Drill to 14215', Landed (18' deep to plan). Wiper to window. Drop ball to open circ sub. Mix LCM pill. Circulate ball to seat 2.6/2.113000. Open circ sub. Pump 30 bbls of 28 ppb LCM pill (10 ppb Mix II fine, 10 ppb of Mix II medium, 8 ppb MI seal fine, Lay in pill from above window 1 :1. Pressure well to 900 psi. Only took about one bbl. Bleed off. POOH. CO BHA. PU BHA #5 with resistivity. RIH. Shallow test good. RIH. Tag 13736' dry. Repeat. Same tag. Bring up pumps. RIH clean. Tag TD 14226'. Log MAD pass memory resistivity up at 500 FPH 2.7/2.3 (about same loss rate as before pumping LCM) to 14030' , then slow to realtime logging speed for tie-in. Correct depth (-6'). Drill. 2.7/3000/13R. Drill to 14257'. 2.8/3500/13R. Drill to 14282'. Returns gradually improving. Survey. Wiper 100'. DriIl2.9/3300/31R. Drill to 14242'. TORC not working properly. POH to window. Working on alternator on CTU. RIH. On bottom drilling. 2.7/3300/30R. Drill to 14390'. Losses about 10 BPH. Drilling ahead. 2.8/3450/20R. Drill to 14444 TORC not working. POH to window. Shut down pumps. After rebooting computers had tool working again. On bottom drilling. 2.7/3360/125L. Drill to 14496'. Lost 10 bbls in last hour. Orienting. Not working. POH to window. Drill ahead 2.7/3390/173R. Drill to 14620' Drill to 14658'. BHA plugged. POOH LD BHA. Did not find what was plugging us. Change probe and motor. Circulate coil volume thru MHA. Stab. ....", Printed: 5/28/2002 11 :20:45 AM ') Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: ') BP EXPLORATION Operations Summary Report X-35 X-35L 1 REENTER+COMPLETE NABORS NABORS 3S Page 3 of6 Start: 5/15/2002 Rig Release: 5/26/2002 Rig Number: N3S Spud Date: 2/14/1994 End: 5/27/2002 5/20/2002 13:00 ~ 16:00 16:00 - 16:30 16:30 - 17:00 17:00 - 19:00 19:00 - 19:45 19:45 - 22:00 22:00 - 22:40 22:40 - 00:00 5/21/2002 00:00 - 01 :00 01 :00 - 02:20 02:20 - 06:00 06:00 - 06:30 06:30 - 09:45 09:45 - 12:30 12:30 - 13:00 13:00-13:15 13:15-15:00 15:00 - 21:15 21 : 15 ~ 22: 00 22:00 ~ 00:00 5/22/2002 00:00 - 05:30 05:30 - 06:00 06:00 - 11 :00 3.00 DRILL N 0.50 DRILL N 0.50 DRILL N 2.00 DRILL P 0.75 DRILL P 2.25 DRILL P 0.67 DRILL P 1.33 DRILL P 1.00 DRILL N 1.33 DRILL N 3.67 DRILL N 0.50 DRILL N 3.25 DRILL N 2.75 DRILL N 0.50 DRILL N 0.25 DRILL N 1.75 DRILL N 6.25 DRILL N 0.75 DRILL N 2.00 DRILL N 5.50 DRILL P 0.50 DRILL P 5.00 DRILL P DPRB PROD1 DPRB PROD1 DPRB PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 DPRB PROD1 DPRB PROD1 DPRB PROD1 DPRB PROD1 DPRB PROD1 DPRB PROD1 DPRB PROD1 DPRB PROD1 DPRB PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 RIH. Log tie-in. Correct depth (-12'). RIH. Orient. Tag TD 14664' Drill 2.8/2.7/3350. Stacking. Had weight transfer problems. Drill to 14726'. Wiper trip 200'. Sticky. Drill ahead. 2.8/3600. Drill to 14798'. Struggling to be back on bottom. Hopefully once out of shale we'll be back on pace. Wiper trip to the window. Pump 10 bbls pill. Pill did not help a lot. Drill ahead. Out of shale. Very hard drilling. Working way down. Drill to 14799'. Unable to make footage. Hit bottom hard wlo motor work. Hard driling. Lots of pi rite and chert on samples. BiMade wiper trip. Back to bottom. No progress. Discussed with town geologist. Waiting on town. Condition hole prior to tie -in. Work tight spot (14620- 14670'). Other than that hole looks in good condition. Got call from town to keep going. POOH. Average losses 8 bbls/hr. Safety meeting. LD BHA. Not a mark on the bit (1-1). Cut 100' off CT. Change packoff. Rehead. Pull and PT CTC. MU BHA. RIH. Log tie-in at 13970' GR spike. Correct depth (-12'). RIH. Tag with MW 14105', fell thru. Clean to 14714'. Tag hard here wlo MW (maybe BHA is hanging up in silty streaks directly above). Try to work BHA past 14714' bit depth. Repeated tags at same depth ~- again no motor work. Then skipped thru. RIH tag 14733' wlo MW. Work past, then tag a few feet later wlo motor work. Work to 14750'. Brick wall here wlo motor work. Continue working to bottom. Directionally drill f/14799 to 14808 looking good then hit another brick wall. Wiper trip back up through to 14700' drill ahead to 14810. Pump Lubetex pill wo effect. Try to put Torq into constant rotation mode not taking commands. Work area from 14700 to 14790', took off drilling, put Torq in constant rotation, drilled to 14837' with good motor work then same problem, acts like bit is balling up. Continue working coil and drilled to 14859'. Short trip to 14000' Drill f/14859' to 14890'. Last samples reflected 40% soft wht slst wI clay & pyrite. Mud losses 5 bph Directionally drill f/14890' to 14935'. Struggling to drill ahead with clays and pyrite in samples. Pumped remaining reconditioned mud (160 bbls) into system and seen some improvement in PR. Making frequent small short trips. This is only adding to coil life problems. Have ordered out 500 bbls new mud for 1100 hr delivery. Making wiper trip to 14100'. Work back to bottom but unable to drill ahead. With Torq in constant rotation back ream slowly while waiting on mud Waiting on new mud. Making slow wiper trips f/14700 to Printed: 5/28/2002 11 :20:45 AM ') ) BPEXPLORA TION Operations Summary Report Page4 of 6 Legal Well Name: X-35 Common Well Name: X-35L 1 Spud Date: 2/14/1994 Event Name: REENTER+COMPLETE Start: 5/15/2002 End: 5/27/2002 Contractor Name: NABORS Rig Release: 5/26/2002 Rig Name: NABORS 3S Rig Number: N3S Task 5/22/2002 06:00 - 11 :00 5.00 DRILL P PROD1 14900' backreaming. 11 :00 - 15:00 4.00 DRILL P PROD1 Start mud swap (Flopro wI 5% lubetex, 6 ppb clay guard) 3250 fs before, 3170 after. Work to bottom. Drill from 14935' to 14971' good PR and motor work in rotation mode. Orient and survey. Unable to keep TORO in constant rotation mode once on bottom again. Orient to 90R having similar problems as before trying to drill ahead. Making short wiper trips with motor work 30~40' off bottom. Even cleaning this area up still not able to drill ahead. Combination of formation (clays/pyrite/chert), resistivity tool drag and, possible damaged bit having effect on Prate. 15:00 - 18:30 3.50 DRILL P PROD1 TOH (Called AOGCC for bop test notification. Witnessing waived by Chuck Shieve) 18:30 - 18:50 0.33 DRILL P PROD1 Crew change PJSM handling BHA 18:50 - 21 :20 2.50 DRILL P PROD1 LID BHA #8 (wI resistivity tool) P/U BHA #9 (wo res) 21 :20 - 23:45 2.42 DRILL P PROD1 RIH to 2500' shallow hole Tore -ok continue RIH 23:45 - 00:00 0.25 DRILL P PROD1 Start tie-in log. 5/23/2002 00:00 ~ 00:10 0.17 DRILL P PROD1 Finish tie-in log -11' correction. 00:10 ~ 01 :00 0.83 DRILL P PROD1 RIH to bottom. 01 :00 - 01: 15 0.25 DRILL P PROD1 MAD pass bottom 30' hole. 01 :15 - 03:20 2.08 DRILL P PROD1 Directionally drill f/14971' to 15150'. 2.6 I 2.6 3300 fs 3600 on bottom plu 48k. 03:20 ~ 04:30 1.17 DRILL P PROD1 Wiper trip to window. Hole looks good. 04:30 ~ 05:50 1.33 DRILL C PROD1 Directionally drill f/15150' to 15289'. 2.6/2.63330 fs 3650 on bottom plu 48k. 05:50 - 07:05 1.25 DRILL C PROD1 Wiper trip. 7 bbl mud lost last hr 07:05 - 09:45 2.67 DRILL C PROD1 Directionally drill f/ 15289' 2.8 I 2.8 3330 fs 3700 on bottom + 7k injector wt. 110'/ /hr PR, constant rotation mode. Surveys indicate climbing trend rather than drop while in rotation. Samples showing increase in clays/pyrite. Orient to drop and drill ahead. to 15450' (planned TD with what is left of coil on reel. 2 wraps +1- 60') 09:45 ~ 14:00 4.25 DRILL C PROD1 TOH 14:00 ~ 14:30 0.50 DRILL C PROD1 LID BHA #9 14:30 ~ 15:00 0.50 DRILL C PROD1 Install TWC 15:00 ~ 20:45 5.75 DRILL C PROD1 Clear and flush stack with water. Test BOPE 300 psi/5 min 3500 psil 5 min 20:45 - 21 :15 0.50 DRILL X WAIT PROD1 Wait on valve crew (stuck behind Nordic 1 rig move) 21 : 15 - 21 : 30 0.25 DRILL C PROD1 Pull TWC 21 :30 ~ 00:00 2.50 DRILL C PROD1 P/U BHA #10 5/24/2002 00:00 ~ 00:30 0.50 DRILL C PROD1 Finish plu BHA #10 00:30 ~ 03:30 3.00 DRILL C PROD1 RIH shallow test Tore - ok continue RIH. 03:30 - 04:40 1.17 DRILL C PROD1 Log tie~in -4' correction. 04:40 - 05: 1 0 0.50 DRILL C PROD1 Continue RIH tight at 14950 - 15000' pulling 70k work through. 05:10 - 05:35 0.42 DRILL C PROD1 Take survey. Rework back to bottom. 05:35 ~ 06:00 0.42 DRILL C PROD1 Directionally drill f/ 15450' Hard to get started stalling motor pulling 70k+ off bottom. RIH wt 3k. Finally get going 2.5 2.5 3800psi on bottom 3550 fs +/- 1 k injector wt (depth @ 0600hrs 15475') 06:00 - 08:25 2.42 DRILL C PROD1 Drilled f/15475 to 15507' Change f/ constant rotation to 60R at 15503'. Having problems stacking out and stalling motor. 08:25 - 08:45 0.33 DRILL C PROD1 Wiper trip 200' no over pulls 08:45 ~ 11 :25 2.67 DRILL C PROD1 Drill f/15501' to 15511' very difficult getting it to drill. Orient to Printed: 5/28/2002 11 :20:45 AM ) ) Legal Well Name: X-35 Common Well Name: X-35L 1 Spud Date: 2/14/1994 Event Name: REENTER+COMPLETE Start: 5/15/2002 End: 5/27/2002 Contractor Name: NABORS Rig Release: 5/26/2002 Rig Name: NABORS 3S Rig Number: N3S Hours 5/24/2002 08:45 - 11 :25 2.67 DRILL C PROD1 15L wo success. Put in contstant rotation and drill to 15515' still stacking. 11 :25 - 12:55 1.50 DRILL C PROD1 Wiper trip up to window, hole in relatively good shape. No problem running through 14800-15000' area. 12:55 - 14:20 1.42 DRILL C PROD1 Still unable to drill ahead at 15515'. Stacking weight or stalling out. Samples reflect predominately siltstone. Stop constant rotation, orient to straight up try one last time,,,nope 14:20 ~ 15:55 1.58 DRILL C PROD1 Making a "wiper" trip and will tie-in starting at 14030' logging up. 15:55 ~ 16:50 0.92 DRILL C PROD1 Log tie-in corrected +8' 16:50 - 17:25 0.58 DRILL C PROD1 RIH 17:25 - 18:00 0.58 DRILL C PROD1 Directionally drill f/15515' to 15534' highside TF then started the stacking problem again. Spend some time with it but acting as before. Called TD 15534'. 18:00 - 22:30 4.50 DRILL C PROD1 TOH for resistivity tool and MADD pass. 22:30 - 00:00 1.50 DRILL C PROD1 LID bha #10 and P/U bha #11 5/25/2002 00:00 ~ 03:15 3.25 DRILL C PROD1 RIH wI bha #11 shallow hole test at 2500' - ok continue RIH to 14070' 03:15 - 05:30 2.25 DRILL C PROD1 Attempt to log tie~in. Info hard to correllate. 05:30 ~ 06:00 0.50 DRILL C PROD1 RIH wI ARC tool hung up at 15073'. Try to work it down but no go. 06:00 - 09:05 3.08 DRILL C PROD1 TOH 09:05 - 12:05 3.00 DRILL C PROD1 LID bha #11 P/U bha #12 for cleanout to run liner. 12:05 ~ 19:00 6.92 DRILL C PROD1 RIH shallow test at 3500' RIH tagged bottom 15540' no correction. Lay in new Flo-Pro mud. TOH 19:00 - 20:00 1.00 DRILL C PROD1 LID bha #12. 20:00 - 23:30 3.50 CASE C COMP Rig~up floor and plu 3 1/2" x 3 3/16" x 2 7/8" liner ( 56 jts 1771.92') and Baker CTLRT. 23:30 - 00:00 0.50 CASE C COMP P/U injector. 5/26/2002 00:00 - 01 :00 1.00 CASE C COMP M/U Baker CTC. Pull test to 37k PT to 3500. M/U to liner strip on well. 01 :00 - 03: 15 2.25 CASE C COMP Release liner from 3 1/2" pipelslip rams. RIH wI liner (wt check) run to bottom no problems. 03: 15 - 03:50 0.58 CASE C COMP Drop and pump 5/8" ball. Land ball pressure up to 4100 psi and release liner from CTLRT wt check and confirm. 03:50 - 06:00 2.17 CASE C COMP Swap casing (f/liner top) to 2% KCL and TOH 06:00 - 06:45 0.75 CASE C COMP Continue swapping well to 2% KCL. 06:45 - 07:30 0.75 CASE C COMP Frezze protect well wi th 30 bbls crude. 07:30 - 08:00 0.50 CASE C COMP LID Baker CTLRT equipment. 08:00 ~ 08:30 0.50 CASE C COMP Set BPV 08:30 - 08:45 0.25 CASE C COMP PJSM pigging coil and blowdown with N2. 08:45 - 10:00 1 .25 CASE C COMP Blowdown coil to tiger tank w/N2 1 0:00 ~ 10:20 0.33 CASE C COMP PJSM rigging down coil/ROC 10:20 - 17:00 6.67 CASE C COMP RID ROC and move to Deadhorse. Clean mud tanks, drain gas buster. Start NO BOPE. 17:00 - 00:00 7.00 CASE C COMP NID BOPE install tree cap and test to 4500 psi. . Clear rig floor. Start RID of CTU #4 Nabors 3S released at midnight 5~26-2002 Continue rig down of 3S and CTU #4. 5/27/2002 00:00 ~ 06:00 6.00 RIGD C COMP Continue to rig down Nabors 3S and CTU #4. Plan is to move off X-35 location to end of X pad. There the centrifuge will be removed, boilers drained, pits throughly cleaned, and other Printed: 5/28/2002 11 :20:45 AM ) ) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: BPEXPLORA TION Operations Summary Report X-35 X-35L 1 REENTER+COMPLETE NABORS NABORS 3S 5/27/2002 00:00 - 06:00 06:00 - 00:00 CÖdè NPT 6.00 RIGD C 18.00 RIGD C Start: 5/15/2002 Rig Release: 5/26/2002 Rig Number: N3S Spud Date: 2/14/1994 End: 5/27/2002 COMP COMP final preparations made for demomobilization to Deadhorse yard. Lower derrick. Move to far end of X pad. Continue demob operations. Last report. Printed: 5/28/2002 11 :20:45 AM ò X-35L 1 Schlumberger Survey Report - Geodetic Report Date: 25-May-02 Survey / DLS Computation Method: Minimum Curvature I Lubinski Client: BP Exploration Alsaska Vertical Section Azimuth: 337.270° Field: Prudhoe Bay Unit - WOA (Drill Pads) Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure / Slot: X-PAD 1 X-35 TVD Reference Datum: MSL Well: X-35 TVD Reference Elevation: 0.000 ft relative to MSL Borehole: X-35L 1 UWI/API#: 500292243660 Magnetic Declination: +26.319° Survey Name I Date: X-35L 11 May 25, 2002 Total Field Strength: 57502.410 nT Tort I AHD I DDII ERD ratio: 410.426° 111285.58 ft 16.906/1.26~ Magnetic Dip: 80.770° -- Grid Coordinate System: NAD27 Alaska State Planes, Zone 4, US Feel Declination Date: May 21, 2002 Location LatlLong: N 70 1428.859, W 148 39 51.51~ Magnetic Declination Model: BGGM 2001 Location Grid N/E YIX: N 5939635.540 ftUS, E 665382.720 ftUS North Reference: True North Grid Convergence Angle: +1.25707770° Total Corr Mag North .> True North: +26.319° Grid Scale Factor: 0.99993107 Local Coordinates Referenced To: Well Head Grid Coordinates Geographic Coordinates Station ID MD Incl I Azim I TVD VSec NI.S EI.W I DLS Northing I Easting Latitude I Longitude (ft) (°) (°) (ft) (ft) (ft) (ft) (0/100ft) (ftUS) (ftUS) 0.00 0.00 0.00 -69.15 0.00 0.00 0.00 5939635.54 665382.72 N 70 1428.859 W 148 39 51.515 125.00 0.34 122.38 55.85 -0.30 -0.20 0.31 0.27 5939635.35 665383.04 N 701428.857 W 148 39 51.505 225.00 0.32 123.39 155.85 -0.78 -0.51 0.80 0.02 5939635.05 665383.53 N 70 1428.854 W 148 39 51.491 325.00 0.46 102.61 255.85 -1.24 -0.75 1.42 0.20 5939634.82 665384.16 N 70 1428.852 W 148 39 51.473 425.00 1.30 78.62 355.83 -1.70 -0.62 2.93 0.90 5939634.99 665385.66 N 70 1428.853 W 148 39 51.429 525.00 2.60 99.47 455.77 -3.13 -0.77 6.28 1.46 5939634.91 665389.01 N 70 1428.852 W 148 39 51.332 625.00 2.59 100.22 555.67 -5.57 -1.54 10.74 0.04 5939634.24 665393.49 N 701428.844 W 1483951.202 725.00 2.49 104.13 655.57 -8.10 -2.47 15.07 0.20 5939633.40 665397.84 N 701428.835 W 1483951.077 825.00 1.82 113.34 755.50 -10.55 -3.63 18.63 0.75 5939632.32 665401.42 N 70 1428.824 W 148 39 50.973 ~ 925.00 2.05 183.31 855.46 -13.30 -6.05 19.99 2.23 5939629.93 665402.83 N 701428.800 W 148 3950.934 1000.00 3.62 217.17 930.37 -15.69 -9.27 18.48 2.98 5939626.68 665401.40 N 70 1428.768 W 148 39 50.977 1025.00 4.52 223.59 955.31 -16.48 -10.61 17.32 4.03 5939625.31 665400.27 N 70 1428.755 W 1483951.011 1125.00 5.97 231.08 1054.88 -19.52 -16.74 10.56 1.60 5939619.04 665393.64 N 70 1428.695 W 148 39 51.208 1225.00 6.59 232.53 1154.28 -22.43 -23.49 1.96 0.64 5939612.10 665385.19 N 70 1428.628 W 148 39 51.458 1325.00 7.64 235.45 1253.51 -25.25 -30.75 -8.07 1.11 5939604.62 665375.33 N 70 1428.557 W 1483951.749 1425.00 8.43 236.61 1352.53 -27.96 -38.56 -19.67 0.81 5939596.56 665363.90 N 70 1428.480 W 1483952.086 1525.00 9.48 237.86 1451.31 -30.67 -46.97 -32.76 1.07 5939587.86 665351.00 N 70 14 28.397 W 148 39 52.467 1625.00 10.45 238.48 1549.80 -33.40 -56.10 -47.47 0.98 5939578.42 665336.50 N 70 1428.308 W 1483952.894 X-35L 1 ASP Final Survey.xls Page 1 of 6 6/4/2002~3:21 PM Grid Coordinates Geographic Coordinates Station ID MO I Incl I Azim I TVO I VSec I N/-5 I EJ.W I OLS Northing I Easting Latitude I Longitude (ft) (°) (°) (ft) (ft) (ft) (ft) (°/1 0 Oft) (ftUS) (ftUS) 1725.00 11.78 239.11 1647.92 -36.23 -66.08 -63.96 1.34 5939568.08 665320.23 N 701428.209 W 1483953.374 1825.00 13.09 238.59 1745.57 -39.39 -77.22 -82.38 1.31 5939556.54 665302.06 N 701428.100 W 1483953.909 1925.00 15.53 239.13 1842.46 -43.00 -89.99 -103.54 2.44 5939543.30 665281.19 N 70 1427.974 W 148 39 54.524 2025.00 17.58 243.15 1938.32 -45.98 -103.69 -128.51 2.35 5939529.07 665256.53 N 701427.839 W 148 39 55.250 2125.00 23.39 250.37 2031.97 -45.99 -117.19 -160.71 6.33 5939514.86 665224.63 N 70 1427.707 W 148 39 56.186 2225.00 28.22 252.16 2121.97 -42.90 -131.11 -201.94 4.89 5939500.04 665183.72 N 701427.570 W 148 39 57.385 2325.00 30.86 252.87 2208.97 -38.38 -145.91 -248.96 2.66 5939484.22 665137.04 N 70 1427.424 W 148 39 58.752 2425.00 34.21 254.66 2293.26 -32.26 -160.90 -300.60 3.49 5939468.09 665085.75 N 70 1427.277 W 148 400.253 2525.00 36.99 256.24 2374.57 -23.95 -175.50 -356.94 2.93 5939452.27 665029.74 N 70 14 27.133 W 148 401.890 2.86 -- 2625.00 39.84 255.78 2452.91 -14.52 -190.53 -417.22 5939435.92 664969.81 N 70 1426.985 W 148 403.643 2725.00 41.13 256.26 2528.97 -4.64 -206.21 -480.22 1.33 5939418.86 664907.17 N 70 1426.831 W 148 405.474 2825.00 42.83 256.20 2603.30 5.78 -222.13 -545.19 1.70 5939401.52 664842.58 N 70 1426.674 W 148 40 7.363 2925.00 45.68 255.30 2674.92 16.05 -239.32 -612.81 2.92 5939382.85 664775.35 N 70 1426.505 W 148 409.328 3025.00 48.65 254.99 2742.90 26.09 -258.12 -683.68 2.98 5939362.50 664704.91 N 70 1426.320 W 148 40 11.388 3125.00 51.22 254.69 2807.26 36.17 -278.14 -757.54 2.58 5939340.87 664631.51 N 70 1426.123 W 148 40 13.535 3225.00 53.89 253.44 2868.06 45.55 -299.95 -833.87 2.85 5939317.40 664555.69 N 701425.909 W 148 4015.754 3325.00 56.28 253.26 2925.29 54.23 -323.44 -912.43 2.39 5939292.18 664477.67 N 70 1425.678 W 148 4018.038 3425.00 58.67 252.95 2979.05 62.80 -347.95 -993.10 2.40 5939265.92 664397.56 N 70 1425.437 W 148 40 20.383 3525.00 60.19 256.19 3029.92 73.76 -370.83 -1076.08 3.18 5939241.22 664315.11 N 70 1425.211 W 148 40 22.795 3625.00 60.24 256.32 3079.59 87.31 -391.45 -1160.39 0.12 5939218.76 664231.28 N 701425.008 W 148 40 25.245 3725.00 60.49 257.26 3129.04 101.69 -411.31 -1245.00 0.85 5939197.04 664147.13 N 70 1424.813 W 148 4027.705 3825.00 61.19 257.56 3177.77 117.06 -430.35 -1330.23 0.75 5939176.15 664062.34 N 70 1424.626 W 148 4030.182 3925.00 60.88 257.23 3226.19 132.44 -449.44 -1415.61 0.42 5939155.19 663977.41 N 701424.438 W 148 40 32.664 4025.00 60.39 257.38 3275.23 147.63 -468.59 -1500.63 0.51 5939134.18 663892.83 N 70 1424.249 W 148 40 35.135 4125.00 59.35 258.72 3325.43 163.80 -486.50 -1585.24 1.56 5939114.41 663808.64 N 701424.073 W 148 40 37.594 4225.00 59.33 260.81 3376.43 182.41 -501.79 -1669.89 1.80 5939097.28 663724.36 N 70 1423.922 W 148 40 40.055 -- 4325.00 59.58 263.40 3427.26 204.46 -513.61 -1755.18 2.24 5939083.58 663639.35 N 701423.806 W 148 40 42.534 4425.00 59.69 263.79 3477.81 228.71 -523.24 -1840.93 0.35 5939072.08 663553.84 N 70 1423.711 W 148 40 45.026 4525.00 59.35 265.68 3528.53 254.57 -531.15 -1926.74 1.66 5939062.29 663468.23 N 70 1423.633 W 148 40 47.521 4625.00 59.77 265.72 3579.20 281.83 -537.61 -2012.71 0.42 5939053.94 663382.43 N 70 1423.569 W 148 40 50.020 4725.00 59.01 267.39 3630.12 310.25 -542.79 -2098.62 1.63 5939046.88 663296.67 N 70 1423.518 W 148 4052.517 4825.00 60.15 264.90 3680.76 338.13 -548.60 -2184.64 2.43 5939039.19 663210.79 N 701423.461 W 148 4055.017 4925.00 60.77 264.97 3730.06 364.53 -556.28 -2271.30 0.62 5939029.61 663124.33 N 70 1423.385 W 148 40 57.536 5025.00 60.84 264.84 3778.84 390.98 -564.03 -2358.25 0.13 5939019.95 663037.57 N 70 1423.308 W 148 41 0.064 5125.00 60.66 265.26 3827.70 417.62 -571.56 -2445.18 0.41 5939010.52 662950.84 N 70 14 23.234 W 148 41 2.590 X-35L 1 ASP Final Survey.xls Page 2 of 6 6/4/2002-3:21 PM Grid Coordinates Geographic Coordinates Station ID MD I Incl I Azim I TVD I VSec I N/.S I EJ.W I DLS Northing I Easting Latitude I Longitude (ft) (°) (°) (ft) (ft) (ft) (ft) (°/1 0 Oft) (ftUS) (ftUS) 5225.00 61.75 262.60 3875.87 442.73 -580.84 -2532.31 2.57 5938999.33 662863.94 N 70 1423.143 W 148 41 5.123 5325.00 61.60 263.38 3923.32 466.58 -591.58 -2619.68 0.70 5938986.68 662776.84 N 701423.037 W 148 41 7.662 5425.00 61.83 263.70 3970.71 491.25 -601.49 -2707.18 0.36 5938974.85 662689.58 N 70 1422.939 W 148 41 10.206 5525.00 61.95 263.11 4017.82 515.76 -611.62 -2794.80 0.53 5938962.81 662602.21 N 70 1422.839 W 148 41 12.752 5625.00 61.42 263.61 4065.26 540.16 -621.80 -2882.24 0.69 5938950.71 662515.02 N 70 1422.738 W 148 41 15.294 5725.00 60.99 262.85 4113.42 564.26 -632.13 -2969.26 0.79 5938938.47 662428.25 N 70 1422.637 W 148 41 17.824 5825.00 60.31 262.15 4162.44 587.16 -643.50 -3055.68 0.91 5938925.21 662342.11 N 70 14 22.524 W 148 41 20.335 5925.00 59.43 261.59 4212.64 608.96 -655.73 -3141.30 1.00 5938911.10 662256.78 N 701422.404 W 148 41 22.824 6025.00 59.15 261.75 4263.70 630.34 -668.19 -3226.37 0.31 5938896.79 662172.01 N 701422.281 W 148 41 25.296 6125.00 58.73 262.22 4315.30 652.10 -680.13 -3311.19 0.58 5938882.98 662087.48 N 701422.163 W 148 41 27.762 C_J 6225.00 58.69 262.03 4367.24 674.01 -691.84 -3395.84 0.17 5938869.42 662003.11 N 701422.047 W 148 41 30.222 6325.00 59.16 263.32 4418.85 696.76 -702.76 -3480.79 1.20 5938856.64 661918.43 N 701421.940 W 148 41 32.691 6425.00 59.77 263.85 4469.66 720.96 -712.38 -3566.38 0.76 5938845.15 661833.08 N 70 1421.845 W 148 41 35.179 6525.00 59.56 264.64 4520.17 746.16 -721.03 -3652.25 0.71 5938834.61 661747.42 N 701421.759 W 148 41 37.675 6625.00 59.27 266.43 4571.05 773.13 -727.74 -3738.08 1.57 5938826.03 661661.77 N 701421.693 W 148 4140.170 6725.00 59.16 266.30 4622.23 801.24 -733.18 -3823.81 0.16 5938818.70 661576.18 N 70 1421.639 W 148 4142.662 6825.00 59.15 266.71 4673.50 829.52 -738.42 -3909.51 0.35 5938811.59 661490.63 N 701421.587 W 148 41 45.152 6925.00 59.24 266.30 4724.72 857.82 -743.65 -3995.24 0.36 5938804.47 661405.04 N 701421.535 W 148 41 47.644 7025.00 59.28 266.51 4775.83 885.99 -749.04 -4081.02 0.18 5938797.20 661319.40 N 701421.482 W 148 41 50.138 7125.00 59.51 265.60 4826.74 913.71 -754.97 -4166.88 0.82 5938789.40 661233.70 N 701421.423 W 148 41 52.633 7225.00 59.53 266.07 4877.47 941.14 -761.23 -4252.84 0.41 5938781.26 661147.91 N701421.361 W1484155.132 7325.00 59.84 266.99 4927.94 969.62 -766.45 -4339.00 0.85 5938774.15 661061.88 N 70 1421.309 W 148 41 57.636 7425.00 59.91 268.07 4978.13 999.57 -770.18 -4425.41 0.94 5938768.52 660975.58 N 70 1421.272 W 148 42 0.148 7525.00 59.96 268.23 5028.23 1030.42 -772.97 -4511.91 0.15 5938763.83 660889.17 N 70 1421.244 W 148 42 2.662 7625.00 59.43 266.17 5078.69 1059.85 -777.18 -4598.14 1.86 5938757.73 660803.06 N 70 14 21.202 W 148 42 5.168 7725.00 59.54 266.45 5129.47 1087.95 -782.73 -4684.11 0.27 5938750.30 660717.24 N 70 1421.147 W 148 42 7.667 .---- 7825.00 59.83 267.24 5179.95 1116.88 -787.48 -4770.30 0.74 5938743.66 660631.18 N 701421.100 W 148 4210.172 7925.00 59.87 266.85 5230.17 1146.13 -791.94 -4856.66 0.34 5938737.31 660544.94 N 701421.055 W 148 4212.682 8025.00 59.82 266.31 5280.41 1174.72 -797.09 -4942.97 0.47 5938730.26 660458.77 N 701421.004 W 148 4215.191 8125.00 60.21 266.11 5330.39 1202.84 -802.82 -5029.40 0.43 5938722.64 660372.50 N 70 1420.947 W 148 4217.703 8225.00 59.74 264.58 5380.43 1229.70 -809.84 -5115.69 1.41 5938713.73 660286.39 N 70 14 20.877 W 148 42 20.211 8325.00 58.96 263.97 5431.40 1254.86 -818.42 -5201.29 0.94 5938703.27 660201.00 N 70 1420.792 W 1484222.699 8425.00 59.15 264.10 5482.83 1279.60 -827.33 -5286.59 0.22 5938692.49 660115.92 N 701420.704 W 148 42 25.179 8525.00 58.73 263.94 5534.42 1304.29 -836.26 -5371.79 0.44 5938681.70 660030.95 N 701420.616 W 148 42 27.655 8625.00 59.14 262.84 5586.02 1328.07 -846.12 -5456.87 1.03 5938669.98 659946.11 N 701420.518 W 148 4230.128 X-35L 1 ASP Final Survey.xls Page 3 of6 6/4/2002~3:21 PM Grid Coordinates Geographic Coordinates Station ID MD Incl Azim I TVD I VSec I N/-S EJ.W I DLS Northing I Easting Latitude I Longitude 1ft) (°) (°) 1ft) (ft) (ft) (ft) (°11 0 Oft) (ftUS) (ftUS) 8725.00 59.22 262.07 5637.26 1350.56 -857.40 -5542.01 0.67 5938656.84 659861.25 N 70 1420.407 W 148 42 32.602 8825.00 59.14 262.29 5688.49 1372.66 -869.08 -5627.09 0.21 5938643.29 659776.45 N 70 1420.291 W 148 4235.075 8925.00 58.82 261.91 5740.02 1394.60 -880.86 -5711.97 0.46 5938629.65 659691.85 N 70 1420.175 W 148 4237.542 9025.00 58.82 262.95 5791.80 1416.97 -892.13 -5796.78 0.89 5938616.52 659607.32 N 70 1420.063 W 148 42 40.007 9125.00 58.93 263.57 5843.49 1440.55 -902.18 -5881.79 0.54 5938604.62 659522.55 N 70 14 19.964 W 148 42 42.477 9225.00 59.10 262.34 5894.97 1463.73 -912.69 -5966.87 1.07 5938592.24 659437.73 N 70 14 19.860 W 1484244.950 9325.00 59.05 263.34 5946.36 1486.75 -923.38 -6051.99 0.86 5938579.68 659352.88 N 70 14 19.754 W 148 42 47.424 9425.00 58.88 264.19 5997.92 1511.08 -932.69 -6137.16 0.75 5938568.51 659267.93 N 70 14 19.662 W 148 42 49.899 9525.00 59.34 264.56 6049.26 1536.32 -941 .10 -6222.56 0.56 5938558.23 659182.74 N 70 14 19.578 W 148 4252.381 ,-,' 9625.00 59.52 264.00 6100.12 1561.51 -949.68 -6308.24 0.51 5938547.77 659097.28 N 70 14 19.493 W 148 42 54.871 9725.00 59.71 264.67 6150.70 1586.82 -958.20 -6394.08 0.61 5938537.37 659011.65 N 70 14 19.409 W 148 42 57.366 9825.00 60.17 264.29 6200.79 1612.43 -966.52 -6480.23 0.57 5938527.16 658925.71 N 70 14 19.326 W 148 4259.870 9925.00 60.04 264.48 6250.63 1637.94 -975.01 -6566.51 0.21 5938516.79 658839.65 N 70 14 19.242 W 148 43 2.378 10025.00 60.34 264.86 6300.35 1663.89 -983.07 -6652.90 0.45 5938506.84 658753.46 N 701419.162 W 148 43 4.889 10125.00 60.44 264.80 6349.75 1690.12 -990.90 -6739.48 0.11 5938497.11 658667.07 N 701419.084 W 148 43 7.405 10225.00 60.58 264.22 6398.98 1715.92 -999.23 -6826.13 0.52 5938486.88 658580.64 N 70 14 19.001 W 148 43 9.923 10325.00 61.13 263.90 6447.68 1741.15 -1008.27 ' -6913.00 0.62 5938475.94 658493.99 N 701418.912 W 148 4312.448 10425.00 61.12 265.22 6495.98 1767.17 -1016.57 -7000.17 1.16 5938465.73 658407.03 N 701418.829 W 148 4314.982 10525.00 59.78 265.07 6545.29 1793.87 -1023.93 -7086.85 1.35 5938456.47 658320.54 N 701418.756 W 148 4317.501 10625.00 60.16 265.54 6595.34 1820.68 -1031.02 -7173.13 0.56 5938447.49 658234.44 N 70 14 18.686 W 148 43 20.008 10725.00 59.32 266.64 6645.73 1848.54 -1036.91 -7259.30 1.27 5938439.71 658148.43 N 70 14 18.627 W 148 43 22.513 10825.00 59.43 267.24 6696.67 1877.50 -1041.50 -7345.23 0.53 5938433.23 658062.62 N 701418.581 W 148 43 25.010 10925.00 58.67 269.25 6748.11 1908.19 -1044.14 -7430.95 1.88 5938428.72 657976.99 N 701418.554 W 148 43 27.502 11025.00 59.28 269.67 6799.65 1940.56 -1044.94 -7516.64 0.71 5938426.03 657891.35 N 70 14 18.545 W 148 43 29.992 11125.00 58.69 271.21 6851.18 1974.28 -1044.29 -7602.33 1.45 5938424.81 657805.67 N 701418.551 W 148 4332.483 11225.00 58.89 271.89 6902.99 2009.44 -1041.97 -7687.83 0.62 5938425.24 657720.15 N 70 14 18.573 W 148 43 34.968 ~ 11325.00 58.75 270.93 6954.77 2044.43 -1039.87 -7773.35 0.83 5938425.47 657634.60 N 7014 18.593 W 148 4337.454 11425.00 58.08 270.11 7007.14 2078.06 -1039.09 -7858.54 0.97 5938424.38 657549.43 N 70 14 18.599 W 148 4339.930 11525.00 58.56 270.91 7059.66 2111.64 -1038.33 -7943.63 0.83 5938423.27 657464.34 N 701418.606 W 148 43 42.404 11625.00 58.89 270.67 7111.58 2145.75 -1037.16 -8029.09 0.39 5938422.58 657378.88 N 70 14 18.617 W 148 43 44.888 11725.00 58.00 270.79 7163.91 2179.67 -1036.07 -8114.30 0.90 5938421.79 657293.68 N 70 14 18.627 W 148 43 47.364 11825.00 54.62 272.05 7219.37 2213.69 -1034.03 -8197.46 3.54 5938422.01 657210.50 N 701418.646 W 148 43 49.782 11925.00 52.72 271.45 7278.61 2247.08 -1031.56 -8277.98 1.96 5938422.71 657129.95 N 70 1418.669 W 148 4352.122 12025.00 51.50 271.84 7340.03 2279.64 -1029.30 -8356.87 1.26 5938423.24 657051.04 N 70 14 18.691 W 148 4354.415 12125.00 50.65 273.28 7402.86 2312.87 -1025.83 -8434.58 1.41 5938425.00 656973.27 N 701418.724 W 148 43 56.674 X-35L 1 ASP Final Survey.xls Page 4 of 6 6/4/2002-3:21 PM Grid Coordinates Geographic Coordinates Station 10 MO I Incl Azim I TVO I VSec I N/.S I El.W I OLS Northing I Easting Latitude I Longitude (ft) (°) (°) (ft) (ft) (ft) (ft) (0/100ft) (ftUS) (ftUS) 12225.00 50.05 272.97 7466.67 2346.45 -1021.63 -8511.46 0.65 5938427.51 656896.32 N 701418.764 W 148 4358.909 12325.00 48.06 276.33 7532.21 2381.15 -1015.54 -8586.73 3.22 5938431.95 656820.95 N 70 14 18.823 W 148 441.096 12425.00 46.99 276.98 7599.73 2417.33 -1007.00 -8659.99 1.17 5938438.88 656747.52 N 70 14 18.906 W 148 443.226 12525.00 45.23 279.05 7669.06 2454.15 -996.97 -8731.34 2.31 5938447.34 656675.97 N 70 14 19.004 W 148 445.300 12625.00 43.19 283.89 7740.76 2493.28 -983.17 -8799.64 3.94 5938459.64 656607.39 N701419.139 W 148 44 7.286 12725.00 42.93 283.48 7813.82 2533.81 -967.01 -8865.98 0.38 5938474.34 656540.72 N 70 14 19.297 W 148 449.215 12825.00 41.53 286.32 7887.87 2574.82 -949.76 -8930.92 2.37 5938490.16 656475.42 N 70 1419.466 W1484411.103 12925.00 41.49 285.64 7962.76 2616.26 -931.51 -8994.63 0.45 5938507.01 656411.32 N 70 1419.645 W 148 4412.956 13025.00 41.09 287.07 8037.90 2657.86 -912.93 -9057.95 1.02 5938524.19 656347.62 N 70 14 19.827 W 148 4414.797 ~ 13125.00 40.04 286.77 8113.86 2699.36 -894.01 -9120.16 1.07 5938541.74 656285.01 N 701420.012 W 148 4416.606 13225.00 37.60 289.62 8191.78 2740.38 -874.48 -9179.71 3.02 5938559.96 656225.05 N 70 14 20.204 W 148 44 18.337 13325.00 36.29 290.44 8271.70 2781.18 -853.90 -9236.18 1.40 5938579.30 656168.15 N 701420.405 W 148 4419.979 13425.00 35.34 290.89 8352.79 2821.38 -833.25 -9290.93 0.99 5938598.74 656112.96 N 701420.608 W 148 44 21.572 13525.00 34.21 291.83 8434.92 2861.06 -812.48 -9344.05 1.25 5938618.33 656059.40 N 70 1420.811 W 148 44 23.116 13625.00 33.82 294.12 8517.82 2901.09 -790.66 -9395.55 1.34 5938639.02 656007.44 N 701421.026 W 148 44 24.614 13725.00 32.90 297.02 8601.34 2942.12 -766.94 -9445.15 1.84 5938661.64 655957.34 N 70 1421.258 W 148 44 26.056 13825.00 32.15 300.59 8685.67 2984.19 -741.06 -9492.25 2.06 5938686.48 655909.68 N 70 1421.512 W 148 44 27.427 13925.00 31.22 303.86 8770.77 3027.17 -713.08 -9536.68 1.95 5938713.48 655864.66 N 701421.787 W 148 44 28.719 13957.00 31.49 306.92 8798.10 3041.31 -703.44 -9550.25 5.05 5938722.82 655850.88 N701421.881 W1484429.114 14044.00 52.11 320.49 8862.73 3094.46 -662.78 -9590.77 25.77 5938762.57 655809.47 N 701422.281 W 148 4430.293 14079.53 54.29 325.38 8884.02 3122.02 -640.08 -9607.90 12.61 5938784.89 655791.86 N 701422.504 W 148 44 30.792 14122.66 65.07 331.22 8905.78 3158.73 -608.42 -9627.33 27.58 5938816.12 655771.74 N 701422.815 W 148 44 31.358 14164.06 76.62 337.26 8919.35 3197.70 -573.25 -9644.22 31.10 5938850.91 655754.08 N 70 1423.161 W 1484431.850 14188.93 83.72 340.62 8923.60 3222.17 -550.39 -9653.01 31.50 5938873.56 655744.79 N 70 1423.385 W 148 44 32.107 14229.13 87.18 346.35 8926.79 3261.99 -511.99 -9664.39 16.61 5938911.70 655732.57 N 70 1423.763 W 148 44 32.439 14286.59 84.50 355.95 8930.96 3317.55 -455.44 -9673.21 17.30 5938968.04 655722.52 N 70 1424.319 W 148 44 32.697 ~ 14345.00 85.71 8.67 8935.97 3370.17 -397.41 -9670.86 21.80 5939026.10 655723.59 N 70 1424.890 W 148 4432.631 14413.00 98.83 358.61 8933.27 3430.82 -329.84 -9666.54 24.29 5939093.75 655726.43 N 70 1425.554 W 148 4432.508 14440.00 103.08 351.18 8928.14 3456.06 -303.46 -9668.88 31.26 5939120.07 655723.51 N 70 1425.814 W 148 4432.577 14476.50 107.30 349.42 8918.57 3490.36 -268.75 -9674.81 12.46 5939154.64 655716.82 N 701426.155 W 148 44 32.751 14524.00 105.20 355.76 8905.27 3534.31 -223.56 -9680.67 13.55 5939199.69 655709.97 N 70 1426.599 W 148 4432.923 14580.03 96.58 349.75 8894.69 3587.27 -169.06 -9687.64 18.64 5939254.02 655701.80 N 701427.135 W 148 4433.127 14634.83 88.45 341.03 8892.28 3641.37 -116.18 -9701.44 21.73 5939306.58 655686.85 N 701427.655 W 148 4433.530 14687.00 90.99 337.14 8892.53 3693.50 -67.46 -9720.06 8.90 5939354.87 655667.17 N 70 1428.134 W 148 44 34.073 14719.50 87.81 330.84 8892.87 3725.93 -38.27 -9734.30 21.71 5939383.74 655652.29 N 70 1428.421 W 148 44 34.489 X-35L 1 ASP Final Survey.xls Page 5 of 6 6/4/2002-3:21 PM Grid Coordinates Geographic Coordinates Station 10 MO Incl Azim TVO I VSec I N/-S E/-W I DLS Northing I Easting Latitude I Longitude (ft) (°) (°) (ft) (ft) (ft) (ft) (01100ft) (ftUS) (ftUS) 14748.50 85.09 326.04 8894.67 3754.52 -13.62 -9749.44 19.00 5939408.05 655636.61 N 701428.663 W 1484434.930 14798.48 88.53 317.68 8897.46 3802.58 25.59 -9780.23 18.06 5939446.57 655604.97 N 701429.048 W 148 44 35.826 14868.00 89.79 320.55 8898.48 3868.62 78.13 -9825.73 4.51 5939498.10 655558.34 N 701429.565 W 148 44 37.151 14911.10 89.63 320.95 8898.69 3909.94 111.51 -9853.00 1.00 5939530.87 655530.35 N 70 1429.893 W 148 44 37.945 14947.04 88.28 321.80 8899.35 3944.50 139.58 -9875.43 4.44 5939558.44 655507.31 N 701430.168 W 148 44 38.598 14991.00 86.57 322.07 8901.32 3986.85 174.15 -9902.50 3.94 5939592.41 655479.48 N 701430.508 W 148 44 39.386 15048.50 86.60 325.68 8904.75 4042.68 220.51 -9936.33 6.27 5939638.01 655444.64 N 701430.964 W 148 44 40.372 15116.50 88.90 337.48 8907.43 4110.16 280.16 -9968.61 17.67 5939696.93 655411.07 N 701431.550 W 14844 41.312 15179.00 89.73 337.46 8908.18 4172.66 337.89 -9992.55 1.33 5939754.12 655385.87 N 70 1432.117 W 148 44 42.010 J - 15239.00 90.07 344.18 8908.28 4232.51 394.52 -10012.26 11.21 5939810.30 655364.93 N 70 14 32.674 W 148 44 42.585 15285.44 90.48 351.10 8908.06 4278.16 439.86 -10022.19 14.93 5939855.41 655354.00 N 701433.120 W 148 44 42.876 15359.21 94.33 352.30 8904.96 4349.53 512.78 -10032.83 5.47 5939928.07 655341.77 N 701433.837 W 148 44 43.188 15394.26 92.88 357.72 8902.76 4382.83 547.61 -10035.87 15.98 5939962.82 655337.97 N 70 1434.179 W 148 44 43.278 15423.84 87.08 359.27 8902.77 4410.39 577.17 -10036.65 20.30 5939992.35 655336.54 N 701434.470 W 148 44 43.302 15480.97 86.47 3.42 8905.98 4462.46 634.18 -10035.31 7.33 5940049.38 655336.63 N 701435.031 W 148 44 43.265 15505.00 88.46 6.06 8907.05 4483.76 658.10 -10033.32 13.75 5940073.33 655338.09 N 70 14 35.266 W 148 44 43.208 15534.00 92.00 8.00 8906.93 4508.92 686.87 -10029.77 13.92 5940102.18 655341.00 N 70 1435.549 W 148 44 43.106 .~ X-35L 1 ASP Final Survey.xls Page 6 of 6 6/4/2002~3:21 PM ANADRILL SCHLUMBERGER Survey report Client...................: BP Exploration (Alaska) Inc. Field. . . . . . . . . . . . . . . . . . . .: Prudhoe Bay Well. . . . . . . . . . . . . . . . . . . . .: X-35L1 API number...............: 50-029-22436-60 Engineer. . . . . . . . . . . . . . . . .: M. Aburto RIG:.....................: Nabors 3S / SLB unit # 4 STATE: . . . . . . . . . . . . . . . . . . .: Alaska ----- Survey calculation methods------------- Method for positions.....: Minimum curvature Method for DLS...........: Mason & Taylor ----- Depth reference ----------------------- Permanent datum...... . . . .: MEAN SEA LEVEL Depth reference..........: GR Tie In @ 13970 ft GL above permanent.......: 0.00 ft KB above permanent... . . . .: N/A - GR Tie In DF above permanent.......: N/A - GR Tie In ----- Vertical section origin---------------- La tit ude ( + N / S -) . . . . . . . . . : 0 . 00 f t Departure (+E/W-)........: 0.00 ft ----- Platform reference point--------------- La tit ude ( + N / S -) . . . . . . . . . : - 999 . 25 f t Departure (+E/W-)........: -999.25 ft Azimuth from rotary table to target: 337.27 degrees [(c)2002 Anadrill IDEAL ID6_1C_10J 25-May-2002 11:45:09 Spud date. . . . . . . . . . . . . . . . : Last survey date... ......: Total accepted surveys...: MD of first survey.......: MD of last survey........: Page 1 of 3 17-May-02 25-May-02 35 13925.00 ft 15534.00 ft '---e'-'/ ----- Geomagnetic data ---------------------- Magnetic model..... ......: BGGM version 2001 Magnetic date............: 16-May-2002 Magnetic field strength..: 1150.06 HCNT Magnetic dec (+E/W-).....: 26.32 degrees Magnetic dip....... ......: 80.77 degrees ----- MWD Reference Reference Reference Tolerance Tolerance Tolerance survey Reference G. . . . . . . . . . . . . . : H..............: Dip. . . . . . . . . . . . : of G...........: of H... . . . . . . . . : of Dip.... . . . . . : Criteria --------- 1002.67 mGal 1150.02 RCNT 80.77 degrees (+/-) 2.50 mGal (+/-) 6.00 HCNT (+/-) 0.45 degrees ----- Corrections --------------------------- Magnetic dec (+E/W-).....: 26.35 degrees Grid convergence (+E/W-).: 0.00 degrees Total az corr (+E/W-)....: 26.35 degrees (Total az corr = magnetic dec - grid conv) Sag applied (Y/N)... .....: No degree: 0.00 ANADRILL SCHLUMBERGER Survey Report 25-May-2002 11:45:09 Page 2 of 3 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azim (deg/ tool qual (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) ( deg) 100f) type type -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 1 13925.00 31.22 303.86 0.00 8770.77 3027.18 -713.08 -9536.68 9563.30 265.72 0.00 TIP 2 13957.00 31.49 306.92 32.00 8798.10 3041.31 -703.44 -9550.25 9576.12 265.79 5.05 Casing 6-axis 3 14044.00 52.11 320.49 87.00 8862.73 3094.47 -662.78 -9590.77 9613.65 266.05 25.77 Interpo Azi. 4 14079.53 54.29 325.38 35.53 8884.02 3122.03 -640.08 -9607.90 9629.20 266.19 12.61 Interpo Azi. 5 14122.66 65.07 331.22 43.13 8905.78 3158.74 -608.42 -9627.33 9646.54 266.38 27.58 Interpo Azi. 6 14164.06 76.62 337.26 41.40 8919.35 3197.71 -573.25 -9644.22 9661.25 266.60 31.10 Interpo Azi. 7 14188.93 83.72 340.62 24.87 8923.59 3222.18 -550.39 -9653.02 9668.69 266.74 31.50 Interpo Azi. 8 14229.13 87.18 346.35 40.20 8926.79 3262.00 -511.99 -9664.40 9677.95 266.97 16.61 SP --../ 9 14286.59 84.50 355.95 57.46 8930.96 3317.56 -455.44 -9673.21 9683.93 267.30 17.30 SP 10 14345.00 85.71 8.67 58.41 8935.97 3370.18 -397.41 -9670.86 9679.03 267.65 21.80 MWD 11 14413.00 98.83 358.61 68.00 8933.27 3430.83 -329.84 -9666.54 9672.16 268.05 24.29 MWD 12 14440.00 103.08 351.18 27.00 8928.14 3456.06 -303.46 -9668.88 9673.64 268.20 31.26 MWD 13 14476.50 107.30 349.42 36.50 8918.58 3490.37 -268.75 -9674.81 9678.54 268.41 12.46 MWD 14 14524.00 105.20 355.76 47.50 8905.27 3534.32 -223.56 -9680.67 9683.25 268.68 13.55 MWD 15 14580.03 96.58 349.75 56.03 8894.69 3587.28 -169.06 -9687.64 9689.12 269.00 18.65 SP 16 14634.83 88.45 341.03 54.80 8892.29 3641.39 -116.18 -9701.45 9702.14 269.31 21.74 SP 17 14687.00 90.99 337.14 52.17 8892.54 3693.52 -67.46 -9720.07 9720.30 269.60 8.89 MWD 18 14719.50 87.81 330.84 32.50 8892.88 3725.94 -38.28 -9734.31 9734.39 269.77 21.71 MWD 19 14748.50 85.09 326.04 29.00 8894.68 3754.53 -13.62 -9749.45 9749.46 269.92 19.00 MWD 20 14798.48 88.53 317.68 49.98 8897.47 3802.58 25.58 -9780.25 9780.28 270.15 18.08 SP 21 14868.00 89.79 320.55 69.52 8898.49 3868.63 78.12 -9825.74 9826.05 270.46 4.52 MWD 22 14911.10 89.63 320.95 43.10 8898.71 3909.95 111.50 -9853.01 9853.64 270.65 1.00 SP 23 14947.04 88.28 321.80 35.94 8899.36 3944.50 139.57 -9875.44 9876.43 270.81 4.44 SP - 24 14991.00 86.57 322.07 43.96 8901.33 3986.86 174.15 -9902.52 9904.05 271.01 3.94 MWD 25 15048.50 86.60 325.68 57.50 8904.76 4042.68 220.50 -9936.35 9938.80 271.27 6.27 MWD 26 15116.50 88.90 337.48 68.00 8907.44 4110.17 280.15 -9968.63 9972.56 271.61 17.67 MWD 27 15179.00 89.73 337.46 62.50 8908.19 4172.67 337.88 -9992.57 9998.28 271.94 1.33 MWD 28 15239.00 90.07 344.18 60.00 8908.29 4232.52 394.51 -10012.27 10020.04 272.26 11.21 MWD 29 15285.44 90.48 351.10 46.44 8908.07 4278.17 439.85 -10022.21 10031.86 272.51 14.93 MWD 30 15359.21 94.33 352.30 73.77 8904.98 4349.54 512.77 -10032.85 10045.94 272.93 5.45 SP [(c)2002 Anadrill IDEAL ID6_1C_I0J ANADRILL SCHLUMBERGER Survey Report 25-May-2002 11:45:09 Page 3 of 3 -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N/S- +E/W- displ Azirn (deg/ tool qual (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) ( deg) 100f) type type -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ -------- ------ ------- ------ -------- -------- ---------------- --------------- ------ 31 15394.26 92.88 357.72 35.05 8902.78 4382.84 547.60 -10035.89 10050.82 273.12 15.97 MWD 32 15423.84 87.08 359.27 29.58 8902.79 4410.40 577.16 -10036.66 10053.24 273.29 20.30 MWD 33 15480.97 86.47 3.42 57.13 8906.00 4462.47 634.17 -10035.33 10055.34 273.62 7.33 MWD 34 15505.00 88.46 6.06 24.03 8907.07 4483.76 658.09 -10033.34 10054.90 273.75 13.75 MWD 35 15534.00 92.00 8.00 29.00 8906.95 4508.93 686.87 -10029.79 10053.28 273.92 13.92 Proj. [(c)2002 Anadrill IDEAL ID6_1C_10] -- ~/......- Customer Well No Installation/Rig Data 8u rveys ) BP Exploration (Alaska) Inc. X-35L 1 Nabors 38 / 8LB CTU # 4 dOd-O,r Received By: ~LJ:ko~ LWD Log Delivery V1.1 , Dec '97 MWD/LWD Log Product Delivery Dispatched To: Date Dispatched: Dispatched By: ) Lisa Weepie 3-Jun-02 Nate Rose No Of Prints No of Floppies 2 Please sign and return to: James H. Johnson BP Exploration (Alaska) Inc. Petrotechnical Data Center (LR2-1 ) 900 E. Benson Blvd. Anchorage, Alaska 99508 Fax: 907-564-4005 e-mail address:johnsojh@bp.com RECEIVED .tUN 1l- ?OO? Alaska Oil & Gas Cons. Commission Anchorage ) '} ~VIÆVŒ (ill~ ~~~~[\1Ä\ AlfA.~KA OILAIVD GAS CONSERVATION COMMISSION TONY KNOWLES, GOVERNOR 333 W. ]TH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Alistair Sherwood CT Drilling Engineer BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit X-35LI BP Exploration (Alaska), Inc. Pennit No: 202-078 Sur Loc: 482' SNL, 513' WEL, SEC. 07, T10N, R14E, UM Btmhole Loc. 212' SNL, 135 WEL, SEC. 02, T10N, R13E, UM Dear Mr. Sherwood: Enclosed is the approved application for pennit to drill the above referenced well. The pennit to drill does not exempt you from obtaining additional pennits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required pennitting detenninations are made. The pennit is for a new wellbore segment of existing well Prudhoe Bay Unit X-35, Pennit No. 193- 199, API 50-029-22436. Production should continue to be reported as a function of the original API number stated above. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, laö ~jd.'!uý< Cammy Oechsli Taylor Chair BY ORDER OF THE COMMISSION DATED this 28th day of May, 2002 jj c/Enclosures cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. 1 a. Type of work 0 Drill III Redrill 0 Re-Entry 0 Deepen 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 482' SNL, 513' WEL, SEC. 07, T10N, R14E, UM At top of productive interval 1193' SNL, 5020' WEL, SEC. 12, T10N, R13E, UM At total depth 212' SNL, 135' WEL, SEC.02, T10N, R13E, UM 12. Distance to nearest property line 13. Distance to nearest well ADL 028286, 4894' MD No Close Approach 16. To be completed for deviated wells Kick Off Depth 13971' MD Maximum Hole Angle 18. Casin~ Program Specifications Size Hole CasinQ WeiQht Grade CouplinQ 3-3/4" 3-3/16" x 2-7/8" 8.81#/6.16# L-80 ST-L STATE OF ALASKA ALAS. -. )ÖIL AND GAS CONSERVATION COh.,~ISSION PERMIT TO DRILL 20 AAC 25.005 1 b. Type of well 0 Exploratory 0 Stratigraphic Test III Development Oil 0 Service 0 Development Gas 0 Single Zone 0 Multiple Zone 5. Datum Elevation (OF or KB) 10. Field and Pool KBE = 69.15' Prudhoe Bay Field / Prudhoe 6. Property Designation Bay Pool ADL 047472 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number X-35L 1 9. Approximate spud date 05/15/02 Amount $200,000.00 14. Number of acres in property 15. Proposed depth (MD and TVD) 2560 15713' MD / 8850' TVD 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} 115 0 Maximum surface 2269 psig, At total depth (TVD) 8800' / 3325 psig Setting Depth Top Bottom Quantitv of Cement LenQth MD TVD MD TVD (include staQe data) 1380' 13750' 8692' 15713' 8850' Uncemented Slotted Liner ~6A. s l~f{ 0 L ;Jtt J1 z....~ Revised: OS/23/02, Change BHL 11. Type Bond (See 20 AAC 25.025) Number 2S100302630-277 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical I~) [= ("~ r: I V E r'" 1\. ... ",. 1m, ~ t. Casing Structural Conductor Surface Intermediate Production Liner 14325 feet 9194 feet 14239 feet 9117 feet Length Plugs (measured) Junk (measured) f\"~ f\V !') "';' 0f1n') I: . ¡ ::"'. ¡ L ,J t.. U.. ~.. Size Atas!<a Oil &. Gas Cons. Comm¡~;~\.\; Cemented Anchorage MD TVD 80' 20" 260 sx Arcticset (Approx.) 110' 3815' 10-3/4" 1112 sx PF 'E', 320 sx Class 'G' 3845' 13922' 7-5/8" 265 sx Class 'G' 13949' 553' 5-1/2" 108 sx Class 'G' 13772' - 14325' 110' 3257' 8861' 8710' - 9194' Perforation depth: measured true vertical 13950' - 13969', 14060' - 14140' 8861' - 8878', 8957' - 9028' 20. Attachments III Filing Fee 0 Property Plat III BOP Sketch 0 Diverter Sketch III Drilling Program III Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements Contact Engineer Name/Number: Alistair Sherwood, 564-4378 Prepared By Name/Number: Terrie Hubble, 564-4628 21. I hereby certify that t~~r..e,going is¡jtu,eø. d /d',co.,r;ect. ~o, ~~.e,.' ,. st, of m., ,y,. kn~".~le. ,d.ge . Date b-,,~ 1/)3"1.. !to' IOJ Signed Alistair Sh.~ 771, >1 ¡dY./!1f.{,"dC{/v.( Tille CT Drrlllng Engineer '/0( II -<.. '-"' , 'CC)~missio,lUse 9nly, , Per.tQit Number API Number J)¡;)p¡oval Date See cover letter "¿... O? - 07 ~ 50- 029-22436-60 .t) / c~ ~ Ii) :;:;t for other requirements Conditions of Approval: Samples Required 0 Yes 0 No Mud Log Required 0 Yes 0 No Hydrogen Sulfide Measures 0 Yes 0 No Directional Survey Required 0 Yes 0 No Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU Other: T es ti?- ~ v F SI ~ ~ç 00 f ~ I j¿..tt; f- Ohgl~(Jt: ~~ 'f by order of .j } Approved By Cammy Oechsll TaYIŒ' Commissioner ,,~".',:;tt\e F~...., ,,' '~i1n, f\ L Date:5 d~ Ù: < Form 10-401 Rev. 12-01-851, t.,"'7 ~ ~ \j JL:, Submit In Triplicate ) BPX X-35L 1 Sidetrack - Extension ') Summary of Operations: A sidetrack lateral from production well X-35 is currently being drilled with Nabors 381 Schlumberger Unit4 coil tubing drilling rig. We have now drilled the permitted plan and logging suggest that the oil in our primary target has been effectively swept. Rather than stopping, we would like to drill onto another banked oil target some 550' further on. Prep work, (Phase 1) and drilling, (Phase 2) operations are detailed below. Phase 1: Screen & Prep Well: Screen - Install dummy GlV's, fluid pack IA & MIT. Fluid pack OA & MIT. Pressure test wellhead seals & tree valves. Completed May 1ih, 02 . E-Line set permanent isolation packer with modified check vlv at 14,050'md, (8945'tvd) Rig-Coil set mechanical thru-tbg, flo-by whipstock at 13,970' md, (-8,883' tvd). . Note: a 10-403 Sundry Permit was not submitted as the existing production intervals are being retained Phase 2: Drill and Complete CTD sidetrack: Started May 18th, 02. 2%" coil has drilled -1480ft of 3%" OH sidetrack from a window cut in the 5%", 13Cr liner at 13,970'. This is already 320' beyond planned TO. As per the attached plan the well will be extended a further 260' to 15,713', with the aid of jointed pipe, added to the BHA. This will bring the additional footage above 500ft, (583' to be exact). The original completion plan remains, that is uncemented 33/16" solid & 2~ slotted liner. Mud Program: . Phase 1: Seawater . Phase 2: Seawater and Flo-Pro (8.6 - 8.7 ppg) Disposal: . No annular injection on this well. . All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. . All Class I wastes will go to Pad 3 for disposal. Casing Program: . 33/16" l-80 solid liner run from 13,750'md (TOl, 8,692' tvd) to 100' outside of the window at 14,075' md . 2~" l-80 solid & slotted liner from 14,075' to TO at approx. 15,710' md - solid joints will be run from T8AO back to the liner deployment sleeve. Well Control: . BOP diagram for Nabors 3S rig 1 Schlumberger CT Unit 4 is attached. . Pipe rams, blind rams and the CT pack off will be pressure tested to 300 psi and to 3,500 psi. . The annular preventer will be tested to 400 psi and 2,200 psi. Directional . See attached directional plan. . Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Logging . Real time MWO, Gamma Ray will be run in the open hole section. Memory Resistivity may be logged after reaching TO Hazards . X-35 was last tested for H2S on the 3/11/02, and reco.rd~d a 20ppm sample concentration. . No fault to be crosses prior to TO has a low lost circulation risk. Reservoir Pressure Reservoir pressure is estimated to be 3,325 psi at 8,800ss. Maximum surface pressure with gas (0.12 psi/ft) to surface is 2,269 psi. ...... South jwb-X35LLwp4 $ ~ 'I ~ ~~ . ,~"ï" I ~ 1 ' I;' I ' 1 ' 1 ' I;' 1 ' I:' I ' I:' 1 ' I:' I ' 1 ' 1 ' I ' .I 'J ' 1 '~ ,_L '_1 ' 1 ':1 ' 1 ':1 'J '; I I I I ] I I I :1 I I I I I I: I I I I: I I I:. I I ,: 1 I 1 1 -' LL ~ . .- ~:"-i I: ~: I: : I ~ I : l.fl .. I.' . . ".': .~.' : . ".': .: I I I ~ . 1 I ~ , I I : 1 I 1 I I I 1 I: I I I I: I I I I: I I 1 I: I I I 1'1 r f rl rl' r, r¡ I ~ r, r I 1.-:. ~;' :::. ~ ~::. ~;' ~:. ~;' :: ~:' ~ - - - f - -1- JI f -1 - -] - - -J- - -:t - - 1- - - t - -1-- ~I- - - t - -:1- -- t - ~ 1- --J- - ~ 1- -1- -- t --1- Lt -- 1 ~. 1- - - t _L 1-- - t.. -1- - -t - -I... ~:.;;-:-:-.~ ;.~-:~ I ,! \ I I 'I I: I I I I:' , : , I: I ': I L I f 1 I' I ~ I I ".':. :~.' ::':::. :~. . I I I s>í~ r 1 ~ I ~ I I I :1 I I I I I I ,~I , I ,¡ 1 I I I~ I I~I ,I I.. I ~: I , I ! 1 , 1 ¡ I , 1 ~ I I 1 J I.-:.:;.~~.:;.~:.:: ~:'.::' "~ 'I I II ~ 11,1 111,1,11,.1111,11' c 'I-I, .1 I I,III:~:<~:."..,.~:.~:~ I I I . I I I I' I. I I I. . .1. .' . . ..1 --t'J-lu . - r--~"-T--:.r--r-Jr--l--~r--r-~:T--r-~r-T-~f--T--r--r .-r--r~T- r-~'-~-r~-l--T'-- .~:Õ~.- .,.""'..-.~:-.&..'< I 11) , I . I I: I I I I: I , : I ,; I ,: I Lit I I I. I , ~ I I ':' . . .:. :~::.::::.:: I 11 .I I ~ ~ l 1 I ~ I) I J I I L: I I J : I I: I l ~~ 1 L 1 I I f 1 I 1 " I\I~ I' I I I ; I I I ': .¡ .' -: ~: ::: ~: :: ~: : .l - -..'.-., '..~...,.;, . -+ I 1 I I, I ,'1J ~ . Y. , . . ~. ":.' .:~. ':.' .:: :::' '::;:::: ::. ':.:::::~::::::' '.'. '". ::1~~~:::~, .,". '. ;. . '., -'<.-'-..l~...J I" I . .~::~~:::~::~:~:::~:~ ','..'c..-:'''::. '. .->. \:: .-::~~.:: -:::.-::.: : '-:""::-'--" .~--:. - '.' -,:,':ë ".. .'- ',':i.','::,'.";.'.'::,':' <:: ':::',:: <,. .":~ .":: ."," ::l~-,: ::~: .'," '".: - . :": -:~: :.~: -: :'. .. ..~" :.:'. -. '.' .. : .' " ¡~ . . -:~: :~: :::~: ::~: :::~: ::~: ~ .... . .~..' .:...:11., .,. .. .. .. .. ... .......... . . ..8.~ 9.8.- 9.8.þ .8.- 98 ..- ..8.- -.,- -.8~. -.8.- ..8~- ..8.- -.81, .' . '. . .. .1. . '. . . .' . ' . ' . ' . " """'."'.""'" ."... 0 ." . . '~ ~<' . , ." . ' " . : : .. ~ ..' . : ~: .: ~ -... : : ~.¡ .: ~: .: ~ t .: ~: .: ~: . : ~.. .:: r .: . :..: .::: .:': .::: .: :.: ~: .: ~: .::: .:~. .... . .."-...' þ . .. . t ~: 8::: . : : .:: ~: .::: r::: .: ~: ~ , , . ."... ,." .'. J' . .' . .' . .' . .' . .'. . . 0 .'1.' . .' . t .' . .' ~.. . .' . ." . .' i .' . . 0 } .' . . .} .' . .' \ .' . .'. . . . 0 . .". .' . ." {~;;:: : tf~ ~: .~-; ~;; ~:?;): f¡~ :~~ :.i~: :.:: : úf ~~ ¡~ ~~ ~f f~;i{ f~( þ~ ~~f f{{¡f{f;?;f} ~\ ~;~ f~.F~ : hi~ ;~,~ ~~J) ~;f{ .':.' ...':..':,.', .':p':... .: ." ,~"":"""":"'J"':""m~,:""",~",,,,,,:,,,'FtU1!it.l'.. ~ ,.,':..':..,':..':." ~}; ~; . ::: ~.; ~?i:':~ ~ ~ ~; ~ ;::; ~; ~;:~ ~ :'i ¥~~~;l)t~; ~t ~~; ~;~ ~~;;.;~.? ~';H~~; ~;;:; ~;~; ~.¡~ H;Ü;~;} P ¡m~~ ~;~;~ ;Ü;9;~; ~;H . ...~.... - '- "..o- -- -. - ....._~ _0' - ~-'- ~ .~~:._.... - --- _..10 - ...-,_..0.1.. - ..n:__.... - oOoJ_-,,-, -".1- ......o.. _L.- ..._._-~..-. .1-""" .. ß- ......- -... "-'."'~ ~.......~.... - ....._&. 1.- :::.:::. ;::::': ':-:., '::: :: f::::': ':: f::::':: ~.::: ~:':: :~'::::.:: ~:':: ::':: ;:':: ~:": :t":: ~:':: ::':: ~:' ::~:':: ~:': ~~:':: ~:': ~::':: ~:": 1 ::':: ~:' :-: ~:' : ~:' ::: ~-:: :~:' ::.: -::"":.0 ~ ',,'. ".':""'.'., ,....-,..t.,.,.",.,..,..,..,..,..,.., .".".-'.',.".',.".',.".""'.'--" . ,. to t .:::.8. ~...:.. .....~.8.:.. ::- .::...::.....:...::...::...::~..::...:::...::...:,...::...:¡...::...:~...:...8..J._:... :.-18,:. ; 81 .¡." ..: + .. -I ..:... +: + +: ;::::"-' ':'---=:'.'~:o.': ..'~:..'::~';:"':,:":,:,O_'~'~',;"'-r:.'t-C.'1-:~'t "t; °t t t t t t t t t ~ + + + :+ t :t t: + t t + :+ + + + :+ + :+ + : + + : + + + +: + +: + +: + +: + + ~ m + itA-A +; ~-.; -t- ¡_t - - -t- ~ -i: -+- ~-~ -t- +- t-.; -t- ¡ -~:i .t-¡-i::~I: ~-+ -t: ¡ -t-i.t~ --i:- - t- --t- +-:-.;.t. ¡ -r -..- ~-.¡ -t¡-t-.;1-¡-i: -+- t- ¡ -i: -tfop-~ t t:..; 1-: 1- t: t t t t: + +: + +; + "Ø.t'\"+ t + t + t + ,. + + .L ,T + :+ t : ) + 4- + ... + + + + + .+ + ,''' + . + + .8:-f- Y' f' I + I + +. + +. + + I + + .. + . + + ' + .¡. I t t; - t; t t: t t t t : + + ; + t: + +: + + t t + ~ t t. '\. ~. to- . - ~ . c . ~ ..1.. . ,. ~.1. . -. _.&.. - ~1J ~. 'J-. ~. ~ ,..~I...'. ~ t .-.41.-.'" ."'~ ..:v ....--:. þ. :.;. :.;. :.:. :~:.-~.:..:~:..:::..:i:..:::..:.Þ:.. . .. .. . ". ... . ,. . It ~ .". ." ~ . 110 . ... ... . . .." ",," ..." .. . . t. ".. . ~ . ",," ... . ".. " ... " . . . . ,," .". . .. "Þ" . ,. .. " ".. A Vert. Exag = 6X 8 0 X-35 XJ15LLwp4 x....3lLwpLext t + t X-section is along proposed MD section 0 600 1000 1500 0 North A' '- ~ ~ ~ ~L ~82Ð 1807 - --8850 - -8875 - -8900 - -8925 .~ - -8950 - -8975 - -9000 MD Profile ;( ~~çt-( - ~~tÆ oS "2'>/ð2 --0-- Survey -Plan - - - Revised Plan ~ - - ,- - - - - - - ; = - - - - - ~ - - - - = = ~ = = = - = - ='= = = = = = = ~ = = = = = = ~ = = = = = = ~ = = = = = = =: = = = : = = =;= = = : = = = ~ = = = = = = = = = = = = = ~ = = = = = = = = = = = = = = = ~ = = = = = = = = = - -' - - - ;- - - -, - - - ~ - - - - - - - L- - -.- - - - - - - ~ - - - - - - ~ - - - - - - ~ - - - - - - -~- - - - - - - ~ - - - - - - - - - - - - -; - - - - - - -¡ - - -- - - -¡-= - - - - - -:- - - - - - - - - - - - - - ~ - - - - - - - - - - - - - - - -õ - - - - - - - - - _...:.. - - -,- Jl.a.vl ~;I ~t~ ~ {5, q 5Ò I ð~ ,1¡ ð..? Wit «Jú(J. W~~ Page 1 cø, ( ð\\ V(t¿J . . ' 1Zjt -b {S/fl~~ ~~(( oM (\., 210 '~lfrlbjf1.VL~eAftf fo -!k- plitt . -10400 800- 600-. ^ ^ ^ J: ~ 0 z 400- 200-. J: ~ :::> 0 en v v v 0- -200 - -400 - -600 -10400 ) ') PLAR VIEW Client: BP Exploration Alsaska Well: X-35Ll (P5) Field: Prudhoe Bay Unit - WOA Structure: X-PAD Scale: 1 in = 200 ft Date: 21-May-2002 , ~.6~ , ~;ð~~~ 8904 TVD ~. ' 96.ð9', 348.01' az -._-_._~...- . ~' ð2ð N' 998ð W ~'''- ~ , , , t I) & , , , Cì:¡ , 111I 1\ , III \ \\ ' Cry 111/100 , III 14978 MD 8908TVD V' 88.04' 329.00' az ',://:.1\. .166N 9890W // \ \. 'I \. 11I1 1\ Cry 111/100 \. 111./ 14848 MD 890~ TVD \ \./'" 86.38' 316.10' az ~.././ 11\ 83 N 9611 W ~ \ '\.\ III , ..1\ --.~ Crv'111/100 'I -14748 MD 869ð TVD \ 6M9' 328.04' az \ 14 S 9749W \ \1 \ \ \ \, \. '\ \\ '\ '\ \ \ \ \, -10200 I -10000 I TO 15713 MD 8eeO TVD 115.48' 14.14' 8Z 874 N 9956W ? Cry 201100 lð813 MD 8876TVD 9ð.48' 14.14' az 781 N 9980 W ~ CN 111/100 1 ð2ð3 MO 8911 TVO 91 :02' 3ð6.3ð' az 428N 9971 W I -10200 I -10000 «< WEST -9800 I -9600 I Tzu. Korth Mag Dee ( E 26.32° ) ..~. X-35L 1 Current I \ I -9800 -9600 EAST »> Schlulberuer -9400 I -800 .-600 -400 -200 -0 --200 - -400 \ ':" I -600 -9400 ö 8200 ~ 8400 - ..... - Q)...J .ß!en 0::2: ~ ~ 8600 II .8 .~ CO .,....= -0 .s::::.0 ..... . 0.0 Q)::í Q en 8800 ëõ~ (,) .. .- ..... t:= Q) Q)œ: > > Q) Q) ::s- ,-W I- 9000 - 9200 3200 1--. -Survey I 3400 CrY 181100 14748 t.Ð 8895 TVD 85.~ 326.()(" 8Z 3754 ~eparItJ"e X-35L 1 Current I 3600 SECTION VIEW BP Exploration Alsaska X-35L1 (P5) Prudhoe Bay Unit - WOA Structure: X-PAD Section At: 337.27 deg May 21, 2002 VERTICAL Client: Well: Field: Date: Crv 101100, 14848 MD '8902 TVD 86.38" 318.10' 8Z 3850 depar(lre CrY 101100 14978 MD 88.04' 3975 depaf1ure \ CrY 101100 15253MD 8911TVD 91.02" 356.35" 8Z 4246 departure Crv 101100 15353 t.Ð 8904 TVD 96.59" 348.01' 8Z 4342 deparltJ"e c -'~ 0 15, 4-SC; I 4400 Vertical Section Departure at 337.27 deg from (0.0,0.0). (1 in = 200 feet) " \ 0 - ~ ..... ~~ \ \ 0 - - - I 3800 4000 4200 CrY 201100 15613 MD 8876 TVD 95.48" 14.14' 8Z 45n depart- " Schlumberuer -' "- "- '\~:) / -- m 15713 MD 8850TVD 115.48' 14.14'8Z 4653 deparllKe I 4600 tJp X-35L 1 0 Schlumberger Proposed Well Profile - Geodetic Report Report Date: May 21, 2002 SUlVey / DLS Computation Method: Minimum Curvature 1 Lubinski Client: BP Exploration Alsaska Vertical Section Azimuth: 337.270° Reid: Prudhoe Bay Un~ - WOA (Drill Pads) studY Vertical Section Origin: N 0.000 ft, E 0.000 f Structure / Slot: X-PAD I X-35 -b -lity TVD Reference Datum: MSL Well: TVD Reference Elevation: 0.0 ft relative to MSL Borehole: ~:~L1 Fea51 I UWUAPI#: 500292243660 Magnetic Declination: 26.318° SUlVey Name / Date: X-35L 1 (P5) 1 May 21, 2002 Total Field Strength: 57502.448 n1 ~ Tort I AHD / DDI/ ERD ratio: 443.271 ° 111458.82 ft 16.951/1.28¿ Magnetic Dip: 80.770° Grid Coordinate System: NAD27 Alaska State Planes, Zone 4, US Feel Declination Date: May 22, 2002 Location lit/Long: N 70 1428.859, W 148 39 51.515 Magnetic Declination Model: BGGM 2001 Location Grid HIE YIX: N 5939635.540 ftUS, E 665382.720 ftUS North Reference: True North Grid Convergence Angle: +1.25707770° Total Corr Mag North -> True North: +26.318° Grid Scale Factor: 0.99993107 Local Coordinates Referenced To: Well Head Grid Coordinates Geographic Coordinates I Station ID MD I Incl I Azlm I TVD I VSec I HI-S I EI-W I DLS Northing I Easting latitude I Longitude (It) (°) (°) (It) (ft) (It) (It) (0/100ft) (ftUS) (ltUS) Cry 10/100 14748.00 85.09 326.04 8894.64 3753.89 -13.98 -9748.68 0.00 5939407.71 655637.38 N 701428.660 W 1484434.908 14750.00 85.11 325.84 8894.81 3755.85 -12.33 -9749.79 10.00 5939409.33 655636.24 N 70 14 28.676 W 14844 34.940 14775.00 85.42 323.35 8896.87 3780.15 7.98 -9764.23 10.00 5939429.32 655621.36 N 70 14 28.876 W 14844 35.360 14800.00 85.74 320.86 8898.80 3804.21 27.65 -9779.53 10.00 5939448.65 655605.63 N 70 1429.069 W 1484435.806 14825.00 86.07 318.38 8900.59 3827.97 46.64 -9795.69 10.00 5939467.28 655589.06 N 70 14 29.255 W 14844 36.276 Cry 10/100 14848.00 86.38 316.10 8902.10 3849.53 63.49 -9811.27 10.00 5939483.78 655573.11 N 701429.421 W 14844 36.730 14850.00 86.40 316.29 8902.23 3851.39 64.93 -9812.65 10.00 5939485.19 655571.70 N 701429.435 W 14844 36.770 14875.00 86.71 318.78 8903.73 3874.88 83.34 -9829.50 10.00 5939503.23 655554.45 N 70 1429.616 W 14844 37.261 14900.00 87.02 321.26 8905.10 3898.72 102.47 -9845.53 10.00 5939522.00 655538.01 N 70 1429.804 W 14844 37.727 -- 14925.00 87.34 323.75 8906.32 3922.86 122.28 -9860.73 10.00 5939541.47 655522.38 N 70 14 29.998 W 14844 38.170 14950.00 87.67 326.23 8907.41 3947.26 142.73 -9875.06 10.00 5939561.60 655507.61 N 70 1430.199 W 14844 38.587 14975.00 88.00 328.71 8908.36 3971.88 163.79 -9888.49 10.00 5939582.36 655493.72 N 70 14 30.406 W 14844 38.979 Cry 10/100 14978.00 88.04 329.00 8908.46 3974.84 166.36 -9890.04 10.00 5939584.89 655492.11 N 70 14 30.432 W 14844 39.024 15000.00 88.27 331.19 8909.17 3996.66 185.42 -9901.01 10.00 5939603.71 655480.73 N 70 1430.619 W 14844 39.343 15025.00 88.54 333.68 8909.87 4021.56 207.57 -9912.57 10.00 5939625.59 655468.69 N 70 14 30.837 W 14844 39.680 15050.00 88.80 336.17 8910.45 4046.53 230.21 -9923.16 10.00 5939648.00 655457.60 N 701431.059 W 14844 39.989 15075.00 89.08 338.65 8910.91 4071.52 253.28 -9932.76 10.00 5939670.85 655447.50 N 701431.286 W 14844 40.269 15100.00 89.35 341.14 8911.25 4096.49 276.76 -9941.35 10.00 5939694.13 655438.40 N 701431.517 W 14844 40.520 X-35L 1 (P5) report.xls Page 1 of 2 5/21/2002-1:54 PM Grid Coordinates Geographic Coordinates StatIon ID MD I Inel I Azim I TVD I VSec I NI-S I EI-W I DLS Northing I Easting Latitude I Longitude (ft) (°) (°) (ft) (ft) (ft) (ft) (0/100ft) (ftUS) (flUS) 15125.00 89.62 343.62 8911.48 4121.39 300.58 -9948.92 10.00 5939717.78 655430.31 N 701431.751 W 14844 40.741 15150.00 89.90 346.11 8911.58 4146.17 324.71 -9955.45 10.00 5939741.76 655423.25 N 701431.988 W 14844 40.931 15175.00 90.17 348.59 8911.57 4170.78 349.10 -9960.92 10.00 5939766.02 655417.25 N 701432.228 W 14844 41.091 15200.00 90.45 351.08 8911.43 4195.18 373.71 -9965.33 10.00 5939790.53 655412.30 N 70 1432.470 W 148 44 41.220 15225.00 90.72 353.56 8911.18 4219.32 398.48 -9968.67 10.00 5939815.21 655408.41 N 70 1432.713 W 14844 41.318 15250.00 90.99 356.05 8910.81 4243.15 423.37 -9970.94 10.00 5939840.05 655405.60 N 70 14 32.958 W 14844 41.385 Crv 10/100 15253.00 91.02 356.35 8910.75 4245.99 426.36 -9971.14 10.00 5939843.03 655405.33 N 701432.988 W 148 44 41.391 15275.00 92.25 354.52 8910.12 4266.88 448.28 -9972.89 10.00 5939864.91 655403.10 N 70 14 33.203 W 148 44 41.443 15300.00 93.65 352.44 8908.84 4290.86 473.09 -9975.72 10.00 5939889.65 655399.73 N 701433.447 W 14844 41.526 .~ 15325.00 95.04 350.36 8906.94 4315.03 497.73 -9979.45 10.00 5939914.20 655395.46 N 70 1433.689 W 148 44 41.636 15350.00 96.42 348.27 8904.45 4339.35 522.18 -9984.06 10.00 5939938.54 655390.32 N 70 1433.930 W 148 44 41.771 Crv 10/100 15353.00 96.59 348.01 8904.11 4342.28 525.09 -9984.67 10.00 5939941.43 655389.64 N 70 1433.958 W 14844 41.788 15375.00 96.54 350.23 8901.59 4363.67 546.55 -9988.80 10.00 5939962.80 655385.04 N 70 1434.169 W 148 44 41.909 15400.00 96.48 352.74 8898.76 4387.75 571.12 -9992.48 10.00 5939987.28 655380.82 N 70 1434.411 W 148 44 42.017 15425.00 96.41 355.26 8895.95 4411.53 595.82 -9995.07 10.00 5940011.91 655377.69 N 70 14 34.654 W 148 44 42.094 15450.00 96.32 357.77 8893.18 4434.99 620.62 -9996.58 10.00 5940036.67 655375.64 N 70 1434.898 W 14844 42.138 15475.00 96.23 0.28 8890.44 4458.07 645.46 -9997.00 10.00 5940061.50 655374.68 N 70 1435.142 W 14844 42.152 15500.00 96.12 2.80 8887.76 4480.72 670.31 -9996.33 10.00 5940086.35 655374.80 N 70 1435.387 W 14844 42.133 15525.00 95.99 5.31 8885.12 4502.92 695.10 -9994.58 10.00 5940111.17 . 655376.01 N 70 1435.630 W 14844 42.083 15550.00 95.86 7.82 8882.54 4524.60 719.81 -9991.74 10.00 5940135.94 655378.30 N 70 14 35.873 W 14844 42.002 15575.00 95.72 10.33 8880.01 4545.74 744.36 -9987.81 10.00 5940160.57 655381.69 N 70 1436.115 W 148 44 41.888 15600.00 95.56 12.83 8877.56 4566.29 768.73 -9982.82 10.00 5940185.04 655386.15 N 701436.355 W 14844 41.744 Crv 20/100 15613.00 95.48 14.14 8876.31 4576.73 781.32 -9979.80 10.00 5940197.69 655388.89 N 70 1436.479 W 14844 41.657 15625.00 97.88 14.14 8874.91 4586.26 792.87 -9976.89 20.00 5940209.30 655391.55 N 70 1436.592 W 148 44 41.573 15650.00 102.88 14.14 8870.41 4605.93 816.71 -9970.89 20.00 5940233.27 655397.02 N 70 1436.827 W 14844 41.399 "_ ! 15675.00 107.88 14.14 8863.78 4625.21 840.08 -9965.00 20.00 5940256.76 655402.40 N 70 1437.057 W 148 44 41.229 15700.00 112.88 14.14 8855.08 4643.95 862.80 -9959.28 20.00 5940279.60 655407.62 N 70 1437.280 W 148 44 41.063 TD 15713.00 115.48 14.14 8849.75 4653.43 874.30 -9956.38 20.00 5940291.16 655410.26 N 70 14 37.393 W 14844 40.979 Leaal Description: Northina m rftUS1 Eastina 00 rftUS1 Surface: 4797 FSL 513 FEL S7 T10N R14E UM 5939635.54 665382.72 Tie-In: 4777 FSL 5222 FEL S12 T10N R13E UM 5939407.71 655637.39 BHL: 385 FSL 150 FEL S2 T10N R13E UM 5940291.15 655410.26 X-35L 1 (P5) report.xls Page 2 of2 5/21/2002-1:54 PM TREE: 4" 5MCAMERON Wß-LHEAD = 11" 5M FMC AcfÏJÄ tOR;;;- '" '" '" ""'BÄkffi .. . ..m.- ........ KB. ELEV = 68.15' SF. ELBï';'" "" '3fÜ3i . . . ....... KOP = 1625' "~~'~ 'A~~ï~~' ':",~?~'5'~?'~i' Datum MD = 13959' ijãiÙilï-fV'b; ,- ""8800'55 ") X-35 L 1 Proposed CTD Sidetrack )TY NOTES: 13 CHROME COMPLETION 10-3/4" eSG, 45.5#, NT~80, LHE, ID = 9.953" l-i 38451 ~ Minimum ID = 3.725" @ 13764' 4-1/2" OTIS XN NIPPLE I :8: I TOP OF 5~ 1/2" LNR l-i 137721 ~ 4-1/2" TBG, 12.6#, 13CR, 0.0152 bpf, ID = 3.958" l-i 137771 r-- 7~5/8" LNR, 29.7#, NT~95 HS, -i 139491 ~ 0.0459 bpf, ID = 6.875" 1 136201 1-14-1/2" OTIS X NIP, ID = 3.813" 1 I 137171 1-17-5/8" x 4-1/2" BKR SABL-3 PKR, ID = 3.93" 1 I 137471 1-14-1/2" OTIS X NIP, ID = 3.813" 1 i 137501 l-i Top of 3~3/16" liner 1 I 137641 1-14-1/2" OTIS XN NIP, ID = 3.725" 1 1 137771 1-14~1/2" WLEG, ID = 3.958" 1 I 137741 1-1 ELMD TT LOGGED 03/25/94 1 ~ 8 L . Z I 20431 1-14~1/2" OTIS SSSV NIP, ID = 3.813" 1 ~ GAS LIFT MANDRELS ST MD TVD DEV TYPE LATCH VLV 6 3004 2729 47 CAM BK 1" 5 6861 4692 59 CAM BK 1" 4 10150 6362 61 CAM BK 1" 3 12280 7502 49 CAM BK 1" 2 13448 8372 35 CAM BK 1" 1 13594 8561 34 CAM BK 1" ~- 140701 1-i3~3/16" x 2,~7/8" crossover 1 I 2-718" pre~drilled liner l-i 157131 1 18. 0000000 ~ 13970' IÎMeChaniCal Ro-by WhiPstock ÆRFORA TION SUMMARY REF LOG: BHC ON 03/07/94 ANGLEATTOPÆRF: 31 @ 13950' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3~3/8" 6 13950' -13969' 0 05/09/96 3~3/8" 6 14060 - 14140' 0 03/26/94 XOX ~~ 14050' HPlPwl standing valve I PBTD l-i 142391 1 ~ 5~1I2" LNR,17#, 13CR~80, 0.0232 bpf, ID = 4.892" l-i 143251 ~ DA TE REV BY COMMENTS 03/13/94 M.LlND. ORIGINAL COMPLETION 02/23/01 SIS-QAA CONVERTED TO CANVAS 03/02/01 SIS-MD FINAL 06/27/01 RN/TP CORRECTIONS DA TE REV BY COMMENTS PRUDHOE BAY UNIT W8...L: X-35 ÆRMIT No: 93-1990 API No: 50-029-22436-00 SEC 7 T10N R14E BP Exploration (Alaska) .t.' H 206707 DATE INVOICE I CREDIT MEMO DESCRIPTION 040902 CK0409021 PYMT COMMENTS: HANDL:NG INST: PERMIT TO DRILL FEE S/H - TERRIE HUBBLE -. THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. TOTAL ~ BP EXPLORATION, (ALASKA) INC. P.O. BOX 196612 ANCHORAGE, ALASKA 99519.6612 GROSS iOO. 00 X4628 )(. 3S L , / ~-e J\\Sed. iOO.OO FIRST NATIONAL BANK OF ASHLAND AN AFFlUATE OF NATIONAL CITY BANK CLEVELAND. OHIO 56-389 ~ DATE 04/11/02 CHECK NO. 00206707 VENDOR DISCOUNT ALÄSKAOILA NET 100- 00 00 H ~P"'Cf""a\!r0, ~ t.. þ ~ ~i r 5 1 R'~ ~ 7~ t.~& ~ !4 ~.~ t\-> F1 r: r' r, I.J¡ þ,V I) ~~ ¡{Ill! r!/'~-¡ L. v ,-lL" - ~aska OU & ~~~!~~~~~~~ :,>\~;;,.,: iOO.OO No. H 208707 CONSOLIDATED COMMERCIAL ACCOUNT 00206707 PAY ONE HUNDRED & 00/100************************************* US DOLLAR To The ORDER Of ALASKA OIL AND GAS CONSERVATION COMMISSION 333 WEST 7TH AVENUE SUITE 100 ANCHORAGE AK 99501 DATE 04/11/02 AMOUNT $100.00 --~' NOT VALID AFTER 120 DAYS \1 t:, in dÞ .f¡ ~ Jì ';'.." /' 1./:' ,{ c:.-."V'Y., .' . ~.~;._~:,.~ /'!;;r:P "-':1:"-.... 118 2 0 b ? 0 ? 118 I: 0'" . 2 0 j B g 5 I: 0 0 8 ....... . g 118 CHECK 1 ST ANDARD LETTER DEVELOPMENT / DEVELOPMENT REDRILL EXPLORA TION INJECTION WELL INJECTION WELL REDRILL Rev: 5/6/02 C\jody\templates ) \ ~ ') TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME ftÚf )(-3.Ç / '¡ CHECK WHAT APPLIES ADD-ONS (OPTIONS) "CLUE" MUL TI LATERAL The permit is for a new wellbore segment of existing well fBve){"" ~ Permit No,7J"/i7 API No. fC' -ð2..?,...2 2..-7'36 (If API number last two (2) Production should continue to be reported as a function of digits are between 60-69) the original API number stated above. PILOT HOLE (PH) In accordance with 20 AAC 25.005(t), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 -70/80) from records, data and logs acquired for well (name on permit). ANNULAR DISPOSAL Please note that an disposal of fluids generated. . . INTO ANNULUS OF ANOTHER WELL ON SAME PAD L-) SPACING EXCEPTION Enclosed is the approved application for permit to drill the above referenced well. The permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Companv Name) will assume the liability of any protest to the spacing exception that may occur. ') ~~~7E :!F !Æ~!Æ~~~!Æ ) AlASKA OIL AND GAS CONSERVATION COMMISSION TONY KNOWLES, GOVERNOR 333 W. pH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Alistair Sherwood CT Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage AK 99519 Re: Prudhoe Bay Unit X-35Ll BP Exploration (Alaska), Inc. Pennit No: 202-078 Sur Loc: 482' SNL, 513' WEL, Sec. 07, TI0N, RI4E, UM Btmhole Loc. 189' SNL, 154' WEL, Sec. 11, TI0N, RI3E, UM Dear Mr. Sherwood: Enclosed is the approved application for permit to drill the above referenced well. The pennit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Annular disposal has not been requested as part of the Permit to Drill application for Prudhoe Bay Unit X-35Ll. , ' " . .,' ~ , Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, ~, ()üU' kf/ CammY~hSli Taylor Chair BY ORDER OF THE COMMISSION DATED thisLt:. day of April, 2002 jjc/Enclosures cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. 1 a. Type of work 0 Drill III Redrill 0 Re-Entry 0 Deepen 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 482' SNL, 513' WEL, SEC. 07, T10N, R14E, UM At top of productive interval 1193' SNL, 5020' WEL, SEC. 12, T10N, R13E, UM At total depth 189' SNL, 154' WEL, SEC. 11, T10N, R13E, UM 12. Distance to nearest property line 13. Distance to nearest well ADL 047476, 5090' MD No Close Approach 16. To be completed for deviated wells Kick Off Depth 13975' MD Maximum Hole Angle 18. Casin~ Program Specifications Size Hole Casing Weiqht Grade Couplina 3-3/4" 3-3I16"x2-7/8" 8.81#/6.16# L-80 ST-L STATE OF ALASKA., ALASKA Ok JND GAS CONSERVATION COMMIS,,- hN PERMIT TO DRILL 20 AAC 25.005 1 b. Type of well 0 Exploratory 0 Stratigraphic Test III Development Oil 0 Service 0 Development Gas 0 Single Zone 0 Multiple Zone 5. Datum Elevation (OF or KB) 10. Field and Pool KBE = 69.15' Pmdhoe Bay Field / Prudhoe 6. Property Designation Bay Pool ADL 047472 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number v X-35L 1 9. Approximate spud date 04/22/02 Amount $200,000.00 14. Number of acres in property 15. Proposed depth (MD and TVD) 2560 15130' MD / 8896" TVD 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} 99 0 Maximum surface 2269 psig, At total depth (TVD) 8800' / 3325 psig Setting Depth Top Bottom Quantitv of Cement Lenath MD TVD MD TVD (include staae data) 1380' 13750' 8692' 15130')" 8896' Uncemented Slotted Liner "... ~A- -S{"¿'7/0).. A- ~ !;:;~-0~ 11. Type Bond (See 20 AAC 25.025) Number 2S100302630-277 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner 14325 feet , 9194 feet 14239 feet 9117 feet Len'gth Plugs (measured) Junk (measured) Size Cemented MD TVD 260 sx Arcticset (Approx.) 110' 110' 1112 sx PF 'E', 320 sx Class 'G' 3845' 3257' 265 sx Class 'G' 13949' 8861' 8e)"" 20" 3815' 1 0-3/4" 13922' 7-5/8" 5531. 5-1/2" 108 sx Class 'G' 13772' - 143251 8710' - 9194' RECe'VED true vertical MAR 2 8 ZOOl AllllllOIiGIICœl.cœøni&1IiOO III Filing Fee ,0 Property Plat III BOP Sketch 0 Diverter Sketch III Drilling~ III Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements 139501 - 13969', 14060' - 14140' Perforation depth: measured 8861' - 8878', 8957' - 9028' 20. Attachments Contact Engineer Name/Number: Alistair Sherwood, 564-4378 Prepared By Name/Number: Terrie Hubble, 564-4628 21. I hereby certify that the for'fJ:.lf.. - i ~ is ~e~, ,'~- nd corect to the be~t of my kn~~ledge . Signed Alistair Sherwood r (1tU-( ~~tJ...... Title CT Dnlllng Engineer " Commission Use Only Permit Number API Number ¿ 02 - 0 .7R 50- 029-22436-60 Conditions of Approval: Samples Required 0 Yes 18 No Hydrogen Sulfide ¥easures ~ Yes 0 No Required Working Pressure for BOPE 0 2K 0 3K Other: Date 3/2!ó(O r Appr~:)V,1 ~t~ì See cover letter HI.' I.' (/ 3'\ for other requirements Mud Log Required 0 Yes 181 No Directional Survey Required ~Yes 0 No D4K D5K D10K 0 15K ~.5K psi for CTU Approved By Form 10-401 Rev. 12-01-85 Origina~ Signed By C~mniy nechsli commisSioÃr ", It... ! ~\ j' ~ I:,; ~ ¡' f '/ ' ¡¡,JdJr L by order of the commission Date 4;/~O;} Submit In Triplicate ) BPX X-35L 1 Sidetrack ) Summary of Operations: A sidetrack lateral from production well X-35 will be drilled with Nabors 3S / Schlumberger Unit4 coil tubing drilling rig. Specific prep work, (Phase 1) and drilling, (Phase 2) operations are detailed below. Phase 1: Screen & Prep Well: Screen -Install dummy GlV's, fluid pack IA & MIT. Fluid pack OA & MIT. Pressure test wellhead seals & tree valves. Prep - as detailed below is planned to start April 8th, 02 .,/ . Set permanent isolation packer with modified check v/v at 14,050' md, (8945'tvd) Set a mechanical thru-tbg, flo-by whipstock at 13,975' md, (-8,883' tvd). / . Note: a 10-403 Sundry Permit has not been subitted as the existing production intervals are being retained ~' Phase 2: Drill and Complete CTD sidetrack: Planned for April 22"d, 02. 2%" coil will be used to drill -1150ft of 3%" OH sidetrack from a window cut in the 5Y2", 13Cr liner at 13,975'- as per the attached plan. The lateral will be completed with an uncemented 33/16" solid & 2Y8 solid & slotted liner which is designed tol preserve production from the existing perfs, via the PIP with modified check v/v. Mud Program: . Phase 1: Seawater . Phase 2: Seawater and Flo-Pro (8.6 - 8.7 ppg) Disposal: / . No annular injection on this well. . All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. . All Class I wastes will go to Pad 3 for disposal. Casing Program: . 33/16" l-80 solid liner run from 13,750'md (TOl, 8,692' tvd) to 100' outside of the window at 14,075' md ./' . 2ì8" l-80 solid & slotted liner from 14,075' to TD at approx. 15,130'md - solid joints will be run over high Sw intervals. ".- Well Control: . BOP diagram for Nabors 38 rig / Schlumberger CT Unit 4 is attached. / . Pipe rams, blind rams and the CT pack off will be pressure tested to 300 psi and to 3,500 psi. . The annular preventer will be tested to 400 psi and 2,200 psi. Directional . See attached directional plan. . Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Logging . Real time MWD, Gamma Ray & Resistivity logs will be run in the open hole section. Hazards . X-35 was last tested for H2S on the 3/11/02, and recorded a 20ppm sample concentration. . No faults are prognosed along the planned wellbore, however there is a risk of loosing circulation to open Z4B perfs above the whipstock. In this event conventional lCM will be used to manage fluid loss. Reservoir Pressure Reservoir pressure is estimated.to be 3,325 psi at 8,800ss. Maximum surface pressure with gas (0.12 psi/ft) to surface is 2,269 psi. ./ X-35 ) I SAFElY I\UTES: 13 CI-ROWE OO~LETION TREE = 4"5MCAMERON W8.LHEAD = 11" 5M FMC A CTljt\ TOR = BAKER KB. ELEV = 68.15' BF. ELEV = 38.8' KOP = 1625' Max Ang e ,;, 62 @ 5525' Datum MD = . 13959' Datum TVD = 8800' SS } 8 2043" H4-1/2"011S SSSV NP, D =3.813" I 10-314" CSG, 45.5#, NT-80, LI-E, ID = 9.953" H 3845' ~ ~ Gð. 5 LIFT M«\ f\DR8.S ST MD lVD œv TYPE LATa-t VLV 6 3004 2729 47 CAM BK 1" 5 6861 4692 59 CAM BK 1" 4 10150 6362 61 CAM BK 1" 3 12280 7502 49 CAM BK 1" 2 13448 8372 35 CAM BK 1" 1 13594 8561 34 CAM BK 1" L Minimum D = 3.725" @ 13764' 4-1/2" OTIS XN NIPPLE g I I 13620" H4-1/2" 0115 X NIP, ID = 3.813" I ~ I 13717" H7-5I8"x 4-1/2" BKRSABL-3PKR, ID =3.93" I ,. I 13747" H4-1/2" 011S X NIP, ID = 3.813" I I 13764" H4-1/2"OllS XN NP, ID =3.725" I I 13777" H4-1/2" WLEG, ID = 3.958" I I 13774" H ELMDTTLOGGED 03/25/94 I I TOPOF5-1/2"LNR H 13772' t---, I 4-1/2"TBG,12.6#,13CRO.0152bpf,D=3.958" H 1377T I I 7-518" LNR 29.7#, NT-95 HS, ., 13949" r-A 0.0459 bpf, ID = 6.875" .. ÆRFORA 110N SlIv1M«\RY REF LOG: BHCON03AJ7194 ANGlE AT TOPPffiF: 31 @ 13950' Note: Refer b Production œ for historical perf data SIZ E SPF INfERV AL OpnlSqz DATE 3-3/8" 6 13950'-13969' 0 05/09/96 3-318" 6 14060 -14140' 0 03/26/94 1 I PBTD H 14239' I ~1IIr. I 5o1fZ' LNR, 17#, 13CR-80, 0.0232 bpf, D =4.892" H 14325' ~ DATE REV BY COMWENTS '03/13/94 M.UND. ORIGINAL COM>LETION 02/23/01 SIS-~A CONVERTED TO CANVAS 03/02/01 SIS-MD ANAL 06/27/01 RN'TP CORRECTIONS DATE REV BY COM'v1ENTS PRl)[)- OE SAY UNIT WELL: X-35 ÆRMTNo: 93-1990 API N:>: 50-029-22436-00 see 7 T1 ON R14E BP Exploration (Alaska) TREE = 4" 5MCAMERON WELLHEAD = 11" 5M FMC 'AcTuAToR;;;;. ....... .. BAKER ....... .... ......... "", . ..." . KB. ELEV = 68.15' .... ....... . ....... ......, BF. ELEV = 38.8' KOP = 1625' Max Àngle =. ..62 @^ SïS2t5" ............... ...."".... .." '"... .......... ,,,,,,,... Datum MD = 13959' batum TVD ~ . 88ÖO'SS X-35 L 1 ) Proposed CTD Sidetrack 8) 10-3/4" CSG, 45.5#, NT~80, LHE, ID = 9.953" l-i 38451 ~ L Minimum ID = 3.725" @ 13764' 4-1/2" OTIS XN NIPPLE I :8: I Z I TOP OF 5~ 1/2" LNR l-i 137721 r-¡ 4~1/2" TBG, 12.6#, 13CR, 0.0152 bpf, ID = 3.958" Ii 137771 r--- I 7-5/8" LNR, 29.7#, NT~95 HS, -i 139491 ~ 0.0459 bpf, ID = 6.875" ~ SAFETY r)s: 13 CHROME COMPLETION 2043' H4~1/2" OTIS SSSV NIP, ID = 3.813" 1 ~ GAS LIFT MANDRELS ST MD TVD DEV TYÆ LATCH VLV 6 3004 2729 47 CAM BK 1" 5 6861 4692 59 CAM BK 1" 4 10150 6362 61 CAM BK 1" 3 12280 7502 49 CAM BK 1" 2 13448 8372 35 CAM BK 1" 1 13594 8561 34 CAM BK 1" I 13620' ~14-1/2" OTIS X NIP, ID = 3.813" 1 I 13717' I 1 I I 13777' H4~1/2" WLEG, ID = 3.958" I I 137741 H ELMD TT LOGGED 03/25/94 1 13747' 13750' 13764' H7~5/8" x 4~1/2" BKR SABL~3 PKR, ID = 3.93" 1 H4-1/2" OTIS X NIP, ID = 3.813" I l-i Top of 3~3/16" liner I H4-1/2" OTIS XN NIP, ID = 3.725" 1 ~. .... - 14035' 1-i3-3/16" x 2-7/8" cross. over 1 I 2~7/8" pre~drilled liner l-i 15130' 1 18 . .' 0 0 0 0 0 0 0 of ~ 13975' 11 Mechanical FIo-by w hiPSIOCk ÆRFORA TION SUMMARY REF LOG: BHC ON 03/07/94 ANGLEATTOPÆRF: 31 @ 13950' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 13950'-13969' 0 05/09/96 3-3/8" 6 14060 - 14140' 0 03/26/94 XDX ~~ 14050' HRPw/slandingvalye I PBTD l-i 14239' 1 ~ I 5~1/2" LNR, 17#, 13CR~80, 0.0232 bpf, ID = 4.892" l-i 14325' ~ DA TE REV BY COMMENTS 03/13/94 M.LlND. ORIGINAL COMPLETION 02/23/01 SIS~QAA CONVERTED TO CANVAS 03/02/01 SIS-MD FINAL 06/27/01: RNITP CORRECTIONS DA TE REV BY COMMENTS PRUDHOE BAY UNIT WELL: X~35 ÆRMIT No: 93~ 1990 API No: 50~029~22436-00 SEC 7 T10N R14E BP Exploration (Alaska) ò 8200 - 1==1 - 'Q)::J .æcn O~ ~ ~ 8600- II .8 "~ CO ~~ .cO ã.o Q):::J Q ~ 8800- "~ ~ t::= Q) G>CX: > > Q) G> 2w ..... rl8-ln Surwy 13925 MD 87711VD 31.22" 303.88" az 3027 departIre" KOP Crv 101100. I 13975 MD 8814 TVD I 30.18" 305.55" 8Z / 3049 departlre : ! Crv 3&1100 , 13993 foÐ 8829 TVD 31.96" 306.14" 8Z 3057 ilePamre 9000 - 9200 2800 I 3000 I 3200 VERTICAL Client: Well: Field: SECTION VZEW BP Exploration Alaska X-35Ll (P4) Prudhoe Bay Unit - WOA Structure: X-PAD Section At: 337.27 deg March 27, 2002 Date: Cry 121100 14510 MD 8907 TVD 90.00- 356.65" az 3525 cIeþarbn : Crv 121100 1,(780 MD 89071VD . 90.00" 326.65" 8Z . 3771 departure '-, Crv 121100 14985 MO 8907 TVD 90.00" 353.65" 8Z 3Í994 departLre "c Vertical Section Departure at 337.27 deg from (0.0, 0"0). (1 in = 200 feet) 4000 0 0 Cry 121100 14160 MD 89071VD 90.00" 314.65" az 3183 departJ.-e I 3400 I 3600 3800 TO 15130 MD 8896 TVD 98.80" 8.84" 8Z 4125 departure SChlumberUlr ..0 "~' - I 4200 ) ') PLAN VIBW Client: BP Exploration Alaska Well: X-35Ll (P4) Field: Prudhoe Bay Unit - WOA Structure: X-PAD Scale: 1 in = 2000 ft Date: 27-Mar-2002 Schlumbørgør -10200 -10000 I -9800 I -9200 I 400- 200- 0 ^ ^ ^ ::I: ~ 0 Z 0- -200 - ::I: .... :J 0 rn V V V -400 - -600 - -800 - -1000 -10200 I -10000 I -9800 «< WEST I -1000 -9200 -9600 , -9400 I 'l':rue Korth Mag Dee ( E 26.35° ) -400 TD 111130 MD 8886 TVD 98.80. 8.84' 8Z 300 N 9961 W ~ (í~' "\ '\, \ \, \" '\, \" CN 12/100 ",--,--,"--""'-I,¡""----' 149811 MD 8907 rvD \" 90.00. 3113.611. az I" 1 tI8 N 9864 W \ \ \, "1 .=~~~~,..._.,,::::: !fO~~~8:7:D, .' \ 114S 8688W 'I, \ '\, '" \ '\ \ , \ _;7¿~~~,~~~08907TVD , .\ 90.00' 356.811. 8Z '\ 288 S 9811 W \, I" '\, \ \ \ '\ - . \ \ \ -200 -0 --200 0 - -400 --600 TIe-In SuNey 139211 MD 87T1 rvD 31.22. 303.86' 8Z 713S 9537W CN 12/100 14180 MD 8807 TVD 90.00' 314.611' 8Z 800 S 9889 W CN 311100 13993 MD 88211 TVD 31.86. 308.1..8Z 893 S 8ð8S W --800 KOP Crv 101100 139711 MD 881. TVD 30.18' 305.55" az 699 S 9556 W I -9600 I -9400 EAST »> bp X-35L 1 0 Schlumberger Proposed Well Profile - Geodetic Report Report Date: March 27, 2002 Survey I DLS Computation Method: Minimum Curvature 1 Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 337.270° Field: Prudhoe Bay Unn - WOA (Drill Pads) stlldy Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure I Slot: X-PAD/X-35 -llty TVD Reference Datum: MSL Well: ~:SL1 feBslbl TVD Reference Elevation: 0.0 ft relative to MSL Borehole: UWUAPII: 500292243660 Magnetic Declination: 26.348° Survey Name I Date: X-35L 1 (P4) 1 March 27,2002 Total Field Strength: 57501.215 nT Torti AHD I DDII ERD ratio: 349.254° 110312.49 ft/6.787/1.15E Magnetic Dip: 80.769° Grid Coordinate System: NAD27 Alaska State Planes, Zone 4, US Feel Declination Date: April 20, 2002 Location LatlLong: N 70.24134978, W 148.6643096C Magnetic Declination Model: BOOM 2001 -- ; Location Grid HIE Y/X: N 5939635.540 ftUS, E 665382.720 ftUS North Reference: True North Grid Convergence Angle: +1.25707770° Total COR' Mag North .> True North: +26.348° Grid Scale Factor: 0.99993107 Local Coordinates Referenced To: Well Head Grid Coordinates Geographic Coordinates I StatIon ID MD I Incl I Azlm I TW I vSec I N/-S I EJ.W I DLS I Tool Northing I Eastlng latitude I longitude (It) (°) (°) (It) (It) (It) (It) (0/100ft) Face (flUS) (flUS) Tie-In Survey 13925.00 31.22 303.86 8770.77 3027.17 -713.08 -9536.68 0.00 140.94 5938713.48 655864.65 N 70.23938521 W 148.74131083 13950.00 30.70 304.69 8792.21 3037.96 -705.84 -9547.31 2.70 140.23 5938720.48 655853.87 N 70.23940495 W 148.74139674 KOP Cry 10/100 ./ 13975.00 30.18 305.55 8813.76 3048.68 -698.55 -9557.67 2.70 10.00 5938727.54 655843.35 N 70.23942483 W 148.74148046 Cry 35/100 13993.00 31.96 306.14 8829.18 3056.61 -693.11 -9565.20 10.00 10.00 5938732.82 655835.71 N 70.23943967 W 148.74154131 14000.00 34.37 306.89 8835.04 3059.90 -690.83 -9568.27 35.00 9.37 5938735.03 655832.59 N 70.23944588 W 148.74156612 14025.00 43.03 308.97 8854.53 3073.52 -681.21 -9580.57 35.00 7.74 5938744.37 655820.08 N 70.23947212 W 148.74166554 14050.00 51.71 310.47 8871.45 3089.82 -669.46 -9594.69 35.00 6.72 5938755.81 655805.71 N 70.23950417 W 148.74177967 14075.00 60.40 311.64 8885.39 3108.41 -655.84 -9610.31 35.00 6.07 5938769.08 655789.79 N 70.23954133 W 148.74190593 14100.00 69.11 312.63 8896.05 3128.87 -640.68 -9627.05 35.00 5.65 5938783.87 655772.72 N 70.23958269 W 148.74204125 14125.00 77.82 313.51 8903.16 3150.71 -624.33 -9644.54 35.00 5.40 5938799.83 655754.88 N 70.23962729 W 148.742182r --- 14150.00 86.53 314.33 8906.56 3173.43 -607.16 -9662.36 35.00 5.28 5938816.61 655736.69 N 70.23967414 W 148.74232670 Cry 12/100 14159.96 90.00 314.65 8906.86 3182.60 -600.19 -9669.46 35.00 90.00 5938823.42 655729.44 N 70.23969315 W 148.74238410 14175.00 90.00 316.45 8906.86 3196.58 -589.45 -9680.00 12.00 90.00 5938833.93 655718.67 N 70.23972246 W 148.74246931 14200.00 90.00 319.45 8906.86 3220.17 -570.89 -9696.74 12.00 90.00 5938852.11 655701.52 N 70.23977311 W 148.74260467 14225.00 90.00 322.45 8906.86 3244.16 -551.47 -9712.48 12.00 90.00 5938871.18 655685.36 N 70.23982610 W 148.74273196 14250.00 90.00 325.45 8906.86 3268.48 -531.26 -9727.19 12.00 90.00 5938891.06 655670.22 N 70.23988127 W 148.74285095 14275.00 90.00 328.45 8906.86 3293.08 -510.31 -9740.82 12.00 90.00 5938911.71 655656.13 N 70.23993845 W 148.74296122 14300.00 90.00 331.45 8906.86 3317.87 -488.67 -9753.34 12.00 90.00 5938933.06 655643.14 N 70.23999753 W 148.74306254 X-35L 1 (P4) report.xls Page 1 of 3 3/27/2002-11 :56 AM Grid Coordinates Geographic Coordinates Station 10 MO I loci I AzIm I TVD I VSec I NI-S I E/-W I OLS I Tool Northing I Easting Latitude I Longitude (It) (°) (°) (It) (It) (ft) (ft) (0/10Oft) Face (ftUS) (ftUS) 14325.00 90.00 334.45 8906.86 3342.80 -466.40 -9764.70 12.00 90.00 5938955.08 655631.29 N 70.24005833 W 148.74315450 14350.00 90.00 337.45 8906.86 3367.79 -443.58 -9774.89 12.00 90.00 5938977.67 655620.61 N 70.24012063 W 148.74323701 14375.00 90.00 340.45 8906.86 3392.77 -420.25 -9783.87 12.00 90.00 5939000.79 655611.12 N 70.24018434 W 148.74330977 14400.00 90.00 343.45 8906.86 3417.69 -396.48 -9791.61 12.00 90.00 5939024.39 655602.86 N 70.24024925 W 148.74337251 14425.00 90.00 346.45 8906.86 3442.46 -372.34 -9798.10 12.00 90.00 5939048.38 655595.84 N 70.24031518 W 148.74342517 14450.00 90.00 349.45 8906.86 3467.02 -347.89 -9803.31 12.00 90.00 5939072.70 655590.10 N 70.24038195 W 148.74346750 14475.00 90.00 352.45 8906.86 3491.31 -323.21 -9807.24 12.00 90.00 5939097.29 655585.63 N 70.24044936 W 148.74349949 14500.00 90.00 355.45 8906.86 3515.25 -298.35 -9809.88 12.00 90.00 5939122.09 655582.44 N 70.24051727 W 148.74352107 Cry 12/100 14509.96 90.00 356.65 8906.86 3524.68 -288.41 -9810.56 12.00 -90.00 5939132.01 655581.54 N 70.24054442 W 148.74352666 14525.00 90.00 354.85 8906.86 3538.95 -273.41 -9811.68 12.00 -90.00 5939146.98 655580.09 N 70.24058540 W 148.743535~~ 14550.00 90.00 351.85 8906.86 3562.97 -248.58 -9814.58 12.00 -90.00 5939171.74 655576.65 N 70.24065322 W 148.74355\ 14575.00 90.00 348.85 8906.86 3587.32 -223.94 -9818.77 12.00 -90.00 5939196.28 655571.92 N 70.24072052 W 148.743593'63"/ 14600.00 90.00 345.85 8906.86 3611.93 -199.55 -9824.24 12.00 -90.00 5939220.54 655565.92 N 70.24078714 W 148.74363806 14625.00 90.00 342.85 8906.86 3636.74 -175.48 -9830.99 12.00 -90.00 5939244.45 655558.64 N 70.24085287 W 148.74369282 14650.00 90.00 339.85 8906.86 3661.67 -151.80 -9838.98 12.00 -90.00 5939267.95 655550.14 N 70.24091753 W 148.74375758 14675.00 90.00 336.85 8906.86 3686.66 -128.56 -9848.21 12.00 -90.00 5939290.98 655540.40 N 70.24098099 W 148.74383236 14700.00 90.00 333.85 8906.86 3711.64 -105.85 -9858.64 12.00 -90.00 5939313.46 655529.47 N 70.24104300 W 148.74391682 14725.00 90.00 330.85 8906.86 3736.55 -83.71 -9870.24 12.00 -90.00 5939335.33 655517.39 N 70.24110344 W 148.74401072 14750.00 90.00 327.85 8906.86 3761.31 -62.20 -9882.98 12.00 -90.00 5939356.56 655504.18 N 70.24116216 W 148.74411383 Cry 12/100 14759.96 90.00 326.65 8906.86 3771.11 -53.83 -9888.37 12.00 90.00 5939364.81 655498.61 N 70.24118501 W 148.74415744 14775.00 90.00 328.45 8906.86 3785.94 -41.13 -9896.44 12.00 90.00 5939377.33 655490.27 N 70.24121967 W 148.74422274 14800.00 90.00 331.45 8906.86 3810.73 -19.50 -9908.96 12.00 90.00 5939398.67 655477.28 N 70.24127872 W 148.74432407 14825.00 90.00 334.45 8906.86 3835.66 2.77 -9920.32 12.00 90.00 5939420.69 655465.43 N 70.24133952 W 148.74441603 14850.00 90.00 337.45 8906.86 3860.65 25.60 -9930.51 12.00 90.00 5939443.29 655454.74 N 70.24140185 W 148.74449856 14875.00 90.00 340.45 8906.86 3885.64 48.93 -9939.48 12.00 90.00 5939466.41 655445.26 N 70.24146556 W 148.74457124 14900.00 90.00 343.45 8906.86 3910.55 72.69 -9947.23 12.00 90.00 5939490.00 655436.99 N 70.24153044 W 148.74463408 14925.00 90.00 346.45 8906.86 3935.32 96.83 -9953.72 12.00 90.00 5939513.99 655429.98 N 70.24159637 W 148.74468r ~ 14950.00 90.00 349.45 8906.86 3959.89 121.28 -9958.93 12.00 90.00 5939538.31 655424.23 N 70.24166314 W 148.74472907 14975.00 90.00 352.45 8906.86 3984.17 145.97 -9962.86 12.00 90.00 5939562.91 655419.76 N 70.24173058 W 148.74476107 Cry 12/100 14984.96 90.00 353.65 8906.86 3993.76 155.85 -9964.07 12.00 60.00 5939572.76 655418.34 N 70.24175757 W 148.74477095 15000.00 90.90 355.21 8906.74 4008.13 170.82 -9965.53 12.00 60.01 5939587.69 655416.55 N 70.24179846 W 148.74478290 15025.00 92.40 357.81 8906.02 4031.72 195.76 -9967.05 12.00 60.09 5939612.59 655414.48 N 70.24186659 W 148.74479544 15050.00 93.89 0.42 8904.65 4054.89 220.72 -9967.43 12.00 60.23 5939637.54 655413.55 N 70.24193478 W 148.74479877 15075.00 95.38 3.04 8902.63 4077.57 245.62 -9966.68 12.00 60.44 5939662.45 655413.76 N 70.24200281 W 148.74479298 15100.00 96.85 5.66 8899.96 4099.70 270.41 -9964.80 12.00 60.72 5939687.27 655415.09 N 70.24207054 W 148.74477807 X-35L 1 (P4) report.xls Page 2 of3 3/27/2002-11:56 AM Station ID Grid Coordinates Geographic Coordinates 7: I I~~I I ~~ I ;: I V~~ I 7: ~;7 I (O~~) I:: ~~;g I ~~~;)g Latftude I Long~de 15125.00 98.31 8.31 8896.66 4121.22 295.00 -9961.79 12.00 61.07 5939711.92 655417.56 N 70.24213773 W 148.74475402 15130.00 98.60 8.84 8895.93 4125.44 299.89 -9961.05 12.00 0.00 5939716.82 655418.20 N 70.24215109 W 148.74474810 TO Leaal Descriøtion: Surface: 4797 FSL 513 FEL S7 T10N R14E UM Tie-In: 4078 FSL 5010 FEL S12 T10N R13E UM BHL: 5091 FSL 155 FEL S11 T10N R13E UM Northina (Y) rftUSl Eastina lX) rftUSl 5939635.54 665382.72 5938713.48 655864.66 5939716.82 655418.20 ~-' ~~' X-35L 1 (P4) report. xis Page 3 of3 3/27/2002-11 :56 AM Well # }(-b5L\ Date -4t~lL- 2QDl- , 'L All Measurements are from top of Riser 3/14/2002 24. T from top of floor to rig mats 21.81 of room under floor to rig mats ~~35 / ÓÜluJYV$~ JN1í ~ L- ID en a:: 7" otis x-a top of bag BAG bttm of bag ...... middle of slips Blind/Shears ._,.... ..... ....... / TOTs ..." 2-3/8" pi pe/sli ps ...." .." middle of pipes .... ...... ~'- ,-.. Mud Cross Mud Cross middle of flow cross -.... ~ 3-1/2" pipe/slips "', middle of blind/shears -'....... ¡ TOTs 2-3/8 X 3.5 Var. pipe .../ middle of pipe/slips ..."'" ...'" middle of master -~~4'~~~. .~, ~~~ Ii: ,~ ..\~~~ ' , ,~~~, ,-~! . n~~,r,'~~;\I~~ ,. ~ ,,,' , , ,!I"'~"'",,~, \I~I ~ "> : ,~-' ,.' V~\., '\'~ I "'~ 8è~: ' ':~ ._~ ',I ''', , , " hir f( ,..j~ I!'~ ::~l , ' ~,,' , pI ~~"" ~~ r.~i.. ,II ~ ~~d3:1~ltt,~u '~' .. Tubing spool adapter .. Lock down screws Tubing Spool Rig mats Flanae to Flanae Helahts .70' 2.80' 1.90' 1.70' 1.90' -I 206291 ) ) DATE 03/14-/02 CHECK NO. 00206291 DATE INVOICE I CREDIT MEMO DESCRIPTION GROSS VENDOR DISCOUNT AI ASKAnTLA NET 00 )3t202 CK031202A PYMT COMMENTS: HANDLING INST: iOO.OO 100. 00 PeT"ii1Î t to Dr i II Fee 8tH - Terrie Hubble X4628 X.?:ùL\ RECEIVED MAR 2 8 2002 Al8lk801'Gllc.~1IIiIIion ~ ¡ ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. TOTAL ~ 100.00 100.00 BP EXPLORATION, (ALASKA) INC. P.O. BOX 196612 ANCHORAGE, ALASKA 99519-6.612 FIRST NATIONAL BANK OF ASHLAND AN AFFILIATE OF NATIONAL CITY BANK CLEVELAND, OHIO No. H 206291 CONSOLIDATED COMMERCIAL ACCOUNT 56-389 412 00206291 PAY ONE HUNDRED &: 00/100*****************:***:***************** us DOLLAR .DATE. 03/14/02 AMOUNT $100..00 To The ORDER Of ALASKA OIL AND GAS C,ONSERVAT I ON . COMMI 55! ON 333WES;r 7T:H AVENUE SUITE 100 ANCHORAGE NOT VALID AFTER 120.DAYS . -.--...;....... AK 99501 r;¿~'i%!> .'."..,' .,...',.. \~~^~ III 2 0 b 2 c¡ ~ III I: 0 L. ~ 2 0 :¡ a ~ 5 I: 0 0 a L. L. ~ ~ III , ) ) TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTERlPARAGRAPHS TO BE INCLUDED IN TRANSMITIAL LETTER WELL NAME ¡;64 X -, ? ~~ ¿ / CHECK 1 STANDARD LEITER DEVELOPMENT ~ DEVELOPMENT REDRILL EXPLORATION INJECTION WELL INJECTION WELL REDRILL CHECK WHAT APPLIES ADD-ONS (OPTIONS) MULTI LATERAL ,Þ,tü (If api number last two (2) digits are between 60-(9) Pn.,OT HOLE (PH) , ANNULAR DIsr6sAL ù..¿JNO ANNULAR DISPOSAL L.J YES ANNULAR DISPOSAL THIS WELL' "CLUE" The permit is for a new wellbore segment of existing well )( ~ Permit No,?..;> -If? API No...> 0 -C?¿; t~: .:2 ë: 7'3 6 Production should continue to be reported as a function of the original API number stated above. ' In accordance with 2,0 AAC 25.005(1), all ~ords, data and logs acquired for tbe pilot bole must be clearly , differentiated in both name (nameoD permit plus PH) and API number (50 -70/80) from , records, data and logs acquired for wel~ (n8:me on permit). Annular disposal has ~ot been requested. . . Annular Disposal, of drilling wastes will not be approved. . . Annular Disposal of drilling wastes will not be approved. . . DISPOSAL INTO OTHER Please note that an disposal of nulds eenerated. '. . ANNULUS L.J YES + SP ACING EXCEPTION Templates are located m drive\jody\templates Enclosed is the approved application for permit to drill the above referenced well. The permit is approved ,subject to full compliance with 20 AAC 25.055. Approval to peñorate and produce is contingent upon issuance of a conservation order approving 8 spacing exception. (Company Name) will assume tbe liability of any protest to the spacing exception that may occur. WELL PERMIT CHECKLIST COMPANY.If X WELL NAMEf!kt X ":" S 5 L.¡ PROGRAM: Exp - Dev ~ Redrll - Se~ - Wellbore seg 2 Ann. disposal para req - FIELD & POOL G 'Yð/<~ INIT CLASS /J6v /w~,'J ,- GEOL AREA Y 1t"3 UNIT# /JCt{' ó ON/OFF SHORE ð/Ù ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . Y ~ 2. Lease number appropriate. . . . . . . . . . . . . . . . . . . Y \J -r'/ 3. Unique well name and number. .. . . . . . . . . . . . . . . . Y ,N 7/;,: \ 4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y N / 5. Well located proper distance from drilling unit boundary. . . . Y N -1<" ..-...) 6. Well located proper distance from other wells.. . . . . . . . . Y N" J, )/ { 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N rf r . / t U <f f.r r 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . Y N ...J ell ~aM. 9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N 10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N 11. Permit can be issued without conservation order. . . . . . . . Y N A~R ~"T~ / 12. Permit can be issued without administrative approval.. . . . . Y N /{/t 5/:;H~/Ó2-. 13. Can permit be approved before 15-day wait.. . . . . . . . .. ~y N ENGINEERING 14. Conductor string provided. . . . . . . . . . . . . . . . . . . Y. N 15. Surface casing protects all known USDWs. . . . . . . . . . . N 16. CMT vol adequate to circulate on conductor & surf csg. . . . . ¡.lIA 17. CMT vol adequate to tie-in long string to surf csg. . . . . . . . ¥---N- ¡ u.. J 18. CMT will cover all known ProductiV. e horizons. . . . . . . . . . .~-¥--N- ~. t'nt::4 19. Casing designs adequate for C, T, S & permafrost. . . . . . . N 20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . N c¡-t)U 21. If a re-drill,has a 10-403 for abandonment been approved. . . .¥-t't '^' IA 22. Adequate wellbore separation proposed.. . . . . . . . . .-. . & N 23. If diverter required, does it meet regulations. . . . . . . . . . ¡V11l- 24, Drilling fluid program schematic & equip list adequate. . . . . N 25. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . N ~.~p~ 5D~~9r¡. i 26. BOPE press rating appropriate; test to ~50o psig. . N JI1~P :: '2-?t.F¡ P Ç.l-' . \('-161t- {2-fl.;..... 27. Choke manifold complies w/API RP-53 (May 84). . . . . . . . N 28. Work will occur without operation shutdown. . . . . . . . . . . N 29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . @ GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures. . . . . Y {ff) 31. Data presented on potential overpressure zones. . . . . ., ~N ," /:) 32. Seismic analysis of shallow gas zones. . . . . . . . . . . . . Y ,It/, rJ v A~R .P)\~9 33. Seabed condition survey (if off-shore). . . . . . . . . . . . . N K/ .Y?7!'ð.7 - 34. Contact name/phone for weekly progress reports [exploratory only, Y N ANNULAR DISPOSAL 35. With proper cementing records, this plan (A) will contain waste in a suitable receiving zone; . . . . . . . Y N (S) will not contaminate freshwater; or cause drilling waste. .. Y to surface; (C) will not impair mechanical integrity of the well used for disposal; (D) will not damage producing formation or impair recovery from a pool; and (E) will not circumvent 20 MC 25.252 or 20 MC 25.412. Y N GEOLOGY: ENGINEERING: UIC/Annular: COMMISSION: RP~ 1$ ~-~//tfQ/ r-'/~~ nt I..d~¡QIe- 'YI'~/£~/.:,lr- P-p:'¿I--I.~ ..f 0- RfJ (' - APPR DATE k *~Z- ¡1/:A JDH WGA vJc~k :Æf- . COT DTS as /2ff/O <. Comments/Instructions: V£1I b vI 'Vf (Jw'vt-l to t4 I çLerlA4ROJ. ? 124/0 l.. . G:\geology\permits\checklist.doc ~~¡,_/ I -ç¿.~r.r , "í l , .( WEll PERMIT CHECKLIST COMPANy.l<fl,r WELL NAMEPÆ~/ X-.~.ç h / FIELD & POOL b t-.JO! S 0 INIT CLASS ./)~~ (/ ;"" ~J1) ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . 2. Lease number appropriate. . . . . . . . . . . . . . 3. Unique well name and number. .. . . . . . . . . . . . . . . . 4. Well located in a defined pool.. . . . . . . . . . . . . . . . . 5. Well located proper distance from drilling unit boundary. . . . 6. Well located proper distance from other wells.. . . . 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . 8. If deviated, is well bore plat included.. . . . . . . . . . . . . . 9. Operator only affected party.. . . . . . . . . . . . . . . . . . 10. Operator has appropriate bond in force. . . . . . . . . . . . . 11. Permit can be issued without conservation order. . . . . . . . ~y. ß~§/ 12. Permit ca~ be issued without administrativ~ approval.. . . . . l)(r.J ~ tJ 2-. 13. Can permit be approved before 15-day walt.. . . . . . . . . . ENGIN ERING 14. Conductor string provided. . . . . . . . . . . . . . . . . . . 15. Surface casing protects all known USDWs. . . . . . . . . . . 16. CMT vol adequate to circulate on conductor & surf csg. . . . . 17. CMT vol adequate to tie-in long string to surf csg. . . . . . . . . 18. CMT will cover all known productive horizons. . . . . . . . . . 19. Casing designs adequate for C, T, B & permafrost. . . . . . . 20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . 21. If a re-drill, has a 10-403 for abandonment been approved. . . 22. Adequate well bore separation proposed.. . . . . . . . . . . . 23. If diverter required, does it meet regulations. . . . . . . . . . 24. Drilling fluid program schematic & equip list adequate. . . . . 25. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . APPRc DATI; 26. BOPE press rating appropriate; test to 35'00 psig. \¡J(~ '5{2t-l/Ol.. 27. Choke manifold complies w/API RP-53 (May 84). . . . . . . . tt'GJA. ~/ 28. Work will occur without operation shutdown. . . . . . . . . . . /JE"\!\ ,r.t;:~7.- 29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures. . . . . 31. Data presented on potential overpressure zones. . . . . . . 32. Seismic analysis of shallow gas zones. . . . . . . . . . . . . J>.ePR DATE1 33. Seabed condition survey (if off-shore). . . . . . . . . . . . . IJ?(', .~rt?::2. 34. Contact name/phone for weekly progress reports [exploratory on ANNULAR DISPOSAL 35. With proper cementing records, this plan (A) will contain waste in a. suitable receiving zone; . . . . . . . (B) will not contaminate freshwater; or cause drilling waste. .. to surface; (C) will not impair mechanical integrity of the well used for disposal; (D) will not damage producing formation or impair recovery from a . pool; and (E) will not circumvent 20 MC 25.252 or 20 MC 25.412. Y N GEOLOGY: ENGINØ~~ING: UIC/Annular: COMMISSION: RP~ TEM ~:v1 COT. SFO- WGA iJ"l&k OTS 03jZ.C¡ /0 '2- JMH. APPR DATE If!¿ ~.,þ¿ G: \geology\templates \checklist. doc PROGRAM: Exp - Dev)S.. Redrll - Serv - Wellbore se~ Ann. disposal para req - GEOL AREA <?r 1'"""'\ UNIT# /J h.f D ON/OFF SHORE G"v ~~ ~~N Y N Y N Y N Y N Y N Y N Y N Y N Y N \0N -¥---N- ì ~ )NIA-. ¥-N- . .¥-N'" slt/tkd /¡~~ ' @N ø N CTþu... '¥-N- Ai/A. FIe? - bV( wM P ~ Þ (.iL . ~N Y N Al/k. Y N ~N ~ N C,T):::> ~O?~ -ksi. ¡.¡¿f..l) ~ ~ ~ - Y@ Y N Y N / /J Y /U¡ ¡If N Y N L2.~7 P í-f' .. ( ~Jr6~([ ~ G~~ ., Comments/Instructions: