Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout202-097
Image; .1roject Well History File Cover J- ~be
XHVZE
This page identifies those items that were not scanned during the initial production scanning
phase. They are available in the original file, may be scanned during a special rescan activity or
are viewable by direct inspection of the file.
(Q 0 d.. - 0 g 7 'Well History File Identifier
Organizing (done)
RESCAN
./ Color items:
0 Two-Sided
DlrAL DATA
V Diskettes, No. d--
0 Other, Norrype
0
Grayscale items:
0
Poor Quality Originals:
Other:
0
NOTES:
BY:
BEVERLY ROBIN VINCENT SHERY~INDY
Project Proofing
BY:
BEVERLY ROBIN VINCENT SHERYL~~NDY
Scanning Preparation
,~ x 30 = bD
BY:
BEVERLY ROBIN VINCENT SHERyF'.ffiINDY
Äescan Needed
OVERSIZED (Scannable)
0
Maps:
,~~
:¡~
/~ j
$&
Production Scanning . ,J ~ ~ a-JJ..d
Stage 1 PAGE COUNT FROM SCANNED FILE: 7fIJ / (
PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION; ~ YES - NO
BEVERLY ROBIN VINCENT SHER~WINOY DA TE<i(;J.;:lì(r Isl m P
Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: - YES - NO
BY:
BY:
BEVERL Y ROBIN VINCENT SHERYL MARIA WINDY
(SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIREO ON AN INDIVIDUAL PAGE BASIS
DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES)
ReScanned fin<fÍ\,i({¡';,d p1g" 1:'I'~~r:i,ll ,~tt01'Iiolj :,(;,.)iJniJlg ¡;om¡)JI~"NJ)
RESCANNED Bt: BEVERLY ROBIN VINCENT SHERYL MARIA WINDY
General Notes or Comments about this file:
0
Other items scannable by
large scanner
OVERSIZED (Non-Scannable)
0
Logs of various kinds
f ~ Other
DATE:7.J.7jóif/Sl mf
+
I
DATE:1 t).7 Olf'
rr; = TOTAL PAGES 7C
DATE7 ð.1 O~I
mP
VViP
DATE:
ISI
DATE:
ISI
Quality Checked Id/)II(:\
1211 OlO2Rev3NOTScanned, wpd
Re: [Fwd: W-210i Area of Review] •
C~
St~h~€c>w;, Re: [Fwd: W-210i Area of ~evie~vl
From: Thomas Maunder <-tom maunder@admhatate.ak~us>
Date: Mon, 08 Jan 2007 14:06:07 -0900
To: Mark Staudinger ~Mark.Staudinger~a)bp.cozn>
CC: Art Saltmarsh <art_saltmarsh~a,adtni~.state.ak.us>, Jim Regg <jim,regg«~admin:state.ak.us>
Mark,
I have looked at your Area of Review determination. I have used the information available in the
AOGCC well files to perform my own assessment for comparison. The Commission well files for the
listed W pad Ivishak wells do not have a lot of detailed information regarding the cementing
operations and no formation top information for the shallow horizon objectives. I would appreciate if
you could provide additional information concerning the cementing operations and formation tops on
the Ivishak wells.
W-203 and its laterals are the newest wells identified for the AOR. I agree with your assessment on
W-203. Using 30% XS factor, I also agree that the TOCs for W-OS and W-O1 are likely around 4500'
tvd and that the TOC for W-08 is likely below the Schrader. For W-07, I calculate a TOC near 4650'
tvd. Details comments for each well are included below.
I look forward to the additional information. On receipt, I should be able to conclude the AOR
evaluation. I would also appreciate if you would have another look at the information for W-07 so we
can reconcile. Call or message with any questions. Also, is the potential spud date still around
January 20?
Tom Maunder, PE
AOGCC ti~t4.,~4~t'-~,~ (Vi~r~ £~ d ~fl'E[d
~~•4O
`r W-203: -(202-097 -The AOGCC well file has sufficient information to verify AOR statements
provi e a on 30% XS washout, the TOC in the 8-1/2" x 7" annulus would be about 5079' md.
A USIT log was run in this well and indicates a TOC of about 5235' and which is abouf 4Q00' tvd in
agreement with the provided AOR statement. Based on the 5300' and TOC, the XS hole size is about
40%. The L2 window top is at 7120' and (5030' tvd).
----~L2S~ i ------------------------------------------------
W-OS (189-043)--The AOGCC well file does not have sufficient information to verify AOR
statements provided. Based on 30% XS washout, the TOC in the 12-1/4" x 9.625" annulus would be
about 6332' and (4500' tvd).
--11~~ ~--------------------------------------------------
W-01(188-107)--The AOGCC well file does not have sufficient information to verify AOR statements
provided. Based on 30% XS washout, the TOC in the 12-1/4" x 9.625" annulus would be about 5751'
and (4507' tvd). y
-- ---------------~-` ~'~ b--------------------------------
W-08 {189-007)--Although limited operations information is available, there is sufficient information
to conclude that the TOC is likely below the Schrader. File does indicate that the plug was not
bumped and cement was tagged at 11279' (1494' above FC). This essentially means that no tail slurry
was pumped outside the casing. Using only the lead cement volume and 30% XS washout, the TOC
in the 12-1/4" x 9.625" annulus would be about 7131' and (5200' tvd):
W-07 (189-019)--The AO\\GCC well file does not have sufficient information to verify AOR
~.~~y1 ~c~~s,~i~hG~ i~~6-+~C.c~iOt~ F-~'FCSAT~S p` JS Zi.1C-tS ~C~~
1 of 2 ~ n ~ ~ `c~J ~ ~ 1 /8/2007 2:09 PM
Re: [Fwd: W-2101 Area of Review) •
statements provided. Based on 30% XS washout, the TOC in the 12-1/4" x 9.625" annulus would be
about 6508' and (4641' tvd).
Art Saltmarsh wrote, On 1/8/2007 12:23 PM:
------- Original Message --------
Subject:W-2101 Area of Review
Date:Tue, 02 Jan 2007 13:13:07 -0900
From:Staudinger, Mark <Mark.Staudin~e~-(«bp.cotn>
To:art saltmarsh,~z:?admin.state.ak.us
«W-210i_map_TopOBa_gtr_mile_circle (2).ZIP» «W-2101 Area of Review.doc»
Art-
Here are a couple items for the Area of Review needed for W-2101. I wrote up the word document
that basically summarizes the cement integrity of the wells within 1/4 mile of W-2101. The powerpoint
has an annotated W-2101 map. Our geophysicist created the map, and this is what he said -
"I chose the Top OBa interval (highest injection zone) to show W-2101 in relation to it's neighbor
wells. The map is pretty busy - I only showed the well spiders for W-210 and the wells w/I the 1/4
mile circle -you can zoom in to see the detail. There are dots on the map to show where each well is
at TopOBa. I can easily make other versions to show the same sort of thing for the Top of the
Pool/PA (UG_Mc Top), or any other Schrader zone."
Let me know if this information is sufficient, or if more information will be needed.
Thanks,
Mark Staudinger
GPB Rotary Drilling
(907) 564-4337
(907) 440-7403 cell
~ o - 1/8/2007 2:09 PM
.
.
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _ Inserts\Microfilm _ Marker.doc
Permit to Drill 2020970
ì ç-J u.J) ~~ '{
DATA SUBMITTAL COMPLIANCE REPORT
7/6/2004
5/ fA ¡ ~ u¡ Ph JvN 1-
API No. 50-029-23087 -~O-OO
Well Name/No. PRUDHOE BAY UN POL W-203
Operator BP EXPLORATION (ALASKA) INC
Completion Date 6/15/2002 /'
-----_._-~-
MD 11320 ~ TVD 5214 /'
Completion Status 1-01L
Current Status 1-01L
UIC N
.._--" --------- ---- ----
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey Yes
DATA INFORMATION
- - ------ ----_._---~--------
Types Electric or Other Logs Run:
Well Log Information:
(data taken from Logs Portion of Master Well Data Maint)
Log/ Electr
Data Digital Dataset
Type Med/Frmt Number Name
- ~-------
ßg/ --Ptéssure
~
~D
~ 0
~'C Pdf
Rpt
Rpt
J..og/
: e-----
~/ 0
I
i 1.og--
l.b9g/"
i
f~-
I
, be€J---
I
! Rpt
I
~
!
.b9!Y"~
- - --- --- ----------
Log Log Run Interval OH/ -~.-
Scale Media No Start Stop CH Received Comments
5 Blu 1 3600 7015 Case 7/26/2002 Flowing Bottom Hole
Pressure GLS
57 11265 Open 8/23/2002
0 11320 Open 7/17/2002 MWD
0 11320 Open 7/17/2002
57 11320 Case 12/6/2002 Digital Well Log Data
0 11320 Open 7/17/2002
57 11265 Open 8/23/2002
.....s BM '6620 7646 Case 7/30/2002
5 Blu 3600 7015 Case 7/26/2002 Flowing Bottom Hole
Pressure GLS
6620 7646 Case 7/30/2002
5 Blu 3600 7015 Case 7/26/2002 Flowing Bottom Hole
Pressure GLS ""--
5 Col 5000 7550 Case 7/26/2002
5 Col 5000 7550 Case 7/26/2002
5 Col 5000 7550 Case 7/26/2002
0 11320 Open 7/17/2002 MWD
5 Blu 3600 7015 Case 7/26/2002 Flowing Bottom Hole
Pressure GLS
5 Blu 3600 7015 Case 7/26/2002 Flowing Bottom Hole
Pressure GLS
609â6L1S Verification
Ö1irectionaf'Sul'\f~Y
J1itectîonarSurvêy
~4
Directional Survey
LIS Verification
...Pf'oduction
~
Ú-1012 Production
~mperature
¿jerñpera.ture
~c
ßa/íÍma'Ray
Directional SUrv$Y
~ometer
~maRay
Permit to Drill 2020970
MD 11320
TVD 5214
Well Cores/Samples Information:
Name
ADDITIONAL INFORMATION
Well Cored? Y(/(€)
Chips Received? ~
Analysis
Received?
~
--- -- --- -------
- ------ --------- --~
Comments:
-_.--------
- - -------
Compliance Reviewed By:
DATA SUBMITTAL COMPLIANCE REPORT
7/6/2004
Well Name/No. PRUDHOE SAY UN POL W-203
Operator SP EXPLORATION (ALASKA) INC
API No. 50-029-23087-00-00
Completion Date 6/15/2002
Completion Status 1-01L
Interval
Start Stop
Sent
Received
Daily History Received?
Formation Tops
~
Current Status 1-01L
UIC N
Sample
Set
Number Comments
c;N
GJN
_/
Date:
~~ JV/1 LH'j
"-'
)
)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
451 sx Class 'O-600G'
Latex
4-1/2" Uncemented 7617' - 11320'
4-1/2" U ncemented 7349' - 11311'
4-1/2" Uncemented 7120' - 11310'
measured 4-1/2" Slotted Liner (W-203 OBO Sands) 7752' - 11277'
4-1/2" Slotted Liner (W -203L 1 OBC Sands) 7349' - 11311' r: C E , V r: D
4-1/2" Slotted Liner (W-203L2 OBA Sands) 7120' - 11310' R t: ' [.
true vertical 4-1/2" Slotted Liner (W-203 OBO Sands) 5199' - 5213' 2002'
4-1/2" Slotted Liner (W-203L 1 OBC Sands) 5113' - 5214' DEC 1 9
4-1/2" Slotted Liner (W-203L2 OBA Sands) 5030' - 5214' , OilR._GaSCOns. Comm\SSiOI,
Tubing (size, grade, and measured depth) 4-1/2" 12.6# L-80 @ 6996' MD. 4-1/2" Isolation Assembly f~ f2fl.Änchorage
Packers & SSSV (type & measured depth) 7" x 4-1/2" BKR PRM PKR @ 6894' MD. 7" x 4" BKR SC1 R PKR @7163' MD.
7" x 5" BKR ZXP LNR TOP PKR @ 7617'. 4-1/2" HES 'X' Nipple @ 2403'.
13. Stimulation or cement squeeze summary
Intervals treated (measured) (see attached)
Treatment description including volumes used and final pressure
14. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Met Water-Bbl
1589 1758 0
1. Operations periormed:
ACIDIZE WELLBORE W-203
2. Name of Operator
BP Exploration (Alaska), Inc.
3. Address
P. O. Box 196612
Anchorage, AK 99519-6612
4. Location of well at suriace
Operation shutdown-
Pull tubing -
16111FNL, 1197'FEL,Sec.21, T11N, R12E, UM
At top of productive interval FOR WELL W-203
2511'FNL, 1764'FEL,Sec.22, T11N, R12E, UM
At effective depth FOR WELL W-203
202' FNL, 4796' FEL, Sec. 26, T11 N, R12E, UM
At total depth FOR WELL W-203
202'FNL,4796'FEL,Sec.26,T11N, R12E,UM
12. Present well condition summary
Total depth: measured
true vertical
Effective depth:
measured
true vertical
Casing
Conductor
Length
104'
4031'
Size
20" x 34"
Suriace
9-5/8"
Intermediate
7750'
3703'
7"
Liner / Slotted
Liner / Slotted
Liner / Slotted
Perioration depth:
Prior to well operation
11/10/2002
Stimulate _X
Alter casing -
5. Type of Well:
Development _X
Exploratory-
Stratigraphic-
Service-
(asp's 612049,5958645)
(asp's 616777, 5957817)
(asp's 619075, 5954883)
(asp's 619075, 5954883)
11320 feet
5214 feet
Plugs (measured)
11320 feet
5214 feet
Junk (measured)
Cemented
260 sx AS (Aprrox)
640 sx PF 'L'. 274 sx
Class 'G'
Subseq uent to operation 12/10/2002
15. Attachments
Copies of Logs and Surveys run -
Daily Report of Well Operations - Oil _X Gas -
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
~:::~~~
1341
Form 10-404 Rev 06/15/88 .
Plugging - Perforate _X
Repair well - Other -
6. Datum elevation (DF or KB feet)
RKB 87 feet
7, Unit or Property name
Prudhoe Bay Unit
8. Well number
W-203, W-203L 1, W-203L2
9. Permit number / approval number
202-097, ~,~ ~'1>'1
10, API number ö~<6 ~'" C\
50-029-23087-00, (60, (61)
11. Field / Pool
Prudhoe Bay Field / Polaris Pool
Measured Depth
138'
4065'
True Vertical Depth
138'
3204'
7781'
5203'
5179' - 5214'
5113' - 5214'
5030' - 5214'
Casing Pressure
Tubing Pressure
270
297
792
16. Status of well classification as:
Title: Technical Assistant
0
Suspended -
Service
Date December 13, 2002
Prepared by DeWayne R Schnorr 564-5174 ~
SUBMIT IN DUPLICATE (~
10/09/2002
10/28/2002
11/11/2002
11/19/2002
11/20/2002
11/23/2002
11/25/2002
12/07/2002
12/08/2002
12/10/2002
)
)
W-203 (OeD Sands)
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS'
ACID: AC- TIFL
ACID: DRIFT/TAG
ACID: TUBING WASH / PICKLE
ACID: ACID TREATMENT
ACID: ACID TREATMENT
HOT OIL TBG WASH: HOT OIL TREATMENT
HOT OIL TBG WASH: AC-EVAL; AC-FLUID LEVEL
HOT OIL TBG WASH: HOT OIL TREATMENT
HOT OIL TBG WASH: HOT OIL TREATMENT
TESTEVENT --- BOPD: 1,341, BWPD: 0, MCFPD: 792, AL Rate: 3,000
EVENT SUMMARY
10/09/02 T/I/O=1460/1380/360. TIFL PASSED. (PRE ACID STIMULATION). INITIAL IA FL
@ 68091. BLED IA FROM 1380 PSI TO 220 PSI IN ONE HOUR AND 20 MINUTES.
POST BLEED IA FL @ 68091. MONITOR FOR ONE HOUR, NO CHANGE IN lAP.
PUT WELL BOL WITH AL. FINAL WHP's = 1460/220/0.
10/28/02 DRIFT W/ 1 7/8 X 8' PIECE OF STEM, SB THRU HOOK WALL HANGER TO 72441.
( PRE- ACID STIMULATION) «< NOTIFY DSO TO POP. »>
11/11/02 PUMP A MIXTURE OF 22 BBLS XYLENE & 88 BBLS DIESEL DOWN TBG.
FREEZE PROTECT FL WITH 12 BBLS METHANOL. LEAVE WELL SHUT-IN 3
DAYS.
11/20/02
MIRU DS COIL #9. RIH WITH 1.75" SLIM HOLE BHA WITH 1.75" JSN. PASSED
BY UPPER AND MIDDLE LATERALS WITH NO PROBLEM. SAT DOWN AT
11001' CTMD. WORKED PAST OBSTRUCTION AND RIH, TAGGED TD AT
11,3351 CTMD. CALLED FOR ACID. RECIPROCATED PIPE BELOW
OBSTRUCTION UNTIL ACID ARRIVED. LAID 10% HCI ACID FROM 11,3001 TO
7,8001.acid from 11300 to 7800'. SQUEEZED 30% NITRIFIED HCL FROM 11,0001
TO 7,8001. DISPLACED COIL WITH MEOH. POH. RETURNED WELL TO
OPERATOR TO POP TO APC TEST SEPERATOR. RDMO.
11/23/02 PUMPED 100 BBLS DIESEUXYLENE DOWN TUBING @ 1.5 BPM. TURNED
WELL OVER TO APC TEST UNIT TO FLOW BACK.
11/25/02 T/I/O= 350/1300/0 67? IA FL SHOT FOR GLE. IA FL @ STATION # 1 68031. LAST
KNOWN GLR = 3.1 M
Page 1
12/07/02
')
)
W-203 (08D Sands)
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
MIRU. MU BHA, PULL AND PRESSURE TEST. TREE LEANS AND IS
EXTREMELY HARD TO GET STABBED ONTO. WELL FLOWING AT 3.1 MMSCF,
FLP = 340, FL T = 60 DEGREES, 176 DEGREE CHOKE. RIH WITH 1 3/4" JSN. AT
7100', WE HAD TO STOP AND PUMP HOT DIESEL DUE TO THE CHAINS WERE
ICING UP AND CONTINUED PUMPING HOT DIESEL AT 0.5 BPM WHILE RIH TO
11,000' CTMD. DID NOT ENCOUNTER ANY OBSTRUCTIONS RUNNING IN
HOLE.
12/08/02 CTU #5 HOT TUBING WASH. JET 120 BBL's 80% DIESEL 20% XYLENE FROM
11000' TO 6800', SWAPPED TO STRAIGHT HOT DIESEL AND CONTINUED
JETTING TO SURFACE. APC TEST UNIT STARTED A 4 HOUR TEST
IMMEDIATLY AFTER THE TUBING WASH WAS COMPLETED. «< JOB
COMPLETED »>
12/10/02 TESTEVENT --- BOPD: 1,341, BWPD: 0, MCFPD: 792, AL Rate: 3,000
BBLS
0
12
287
968
260
195
97
1819
FLUIDS PUMPED
PRESSURE TEST LUBRICATOR WI 1 BBL OF DIESEL, (1 TEST)
NEAT METHANOL
60/40 METHANOL WATER
DIESEL
20/0 KCL WATER
DAD ACID
NITROGEN, 135 GALS
XYLENE
TOTAL
Page 2
TREE = FMC 4-116"5M
W E3...LHEA:[) =FMC G EN 5
.............. .. . ..."" Y' ^ """'''''''''''''''''''''.
A CTUA TOR =
'KB. "ËCãf = -" ""87~'14
'8 ( Ëï.EV = 58:04
"KO¡:;-;; m n
M~An gïë = m,
Dåtum'M[:;;;;' "
DaturrïNÞ =
'ww~~:,~~,~,
7348'
500ÖSS
12C\fCO NDU CTOR H
19- 5t3"CS ø~4J# .L-ro ,1)=8 .@5" l-i
114'
4005'
MinimumlD= 2."150,11 @ 77391
3 ~1J2HHES XN NIPPLE
I~ TA G 1-1 7090'
BKR HUGHES HOGK\fJJALL HA.NGER - 7124'
Ð =4,125"
)
W-203
W-203 L 1
W-203 L2
ó
I
I
~
)
I 8.Ä. F Err' NOTES
980' 1-i9.5t8" TA M POR T C OLLAR I
2403' 1-i4112" HES X NIP, ID = 3,813"1
GAS LIFT ~NDRE3...S
ST t...[) TVD DB! TYPE VLV LATCH PORT DATE
3 37332002 6'1 KBG-2 RP BK 06l151d1
2 67344854 60 KBG- 2 DMY BK 0 06115102
1 6003, 4æ8 6'1 KBG- 2 DMY B K 0 06115102
000 ~ ti8lO' H4112' HBS DURASL.BlE, ID= S.81(j" I
2S Z I 6994' 1~7'IX4-112"BKRPRMB<R.ID=3B75" I
~ 16963' Irl41 12" HES X N P, ID =3,813"1
, ., , "I, ,,6,',98, ' ,,4, ' I, --l,"" 4' ., l' '12, IIH E" S" X' N,' IP~ ID =", ,,', 3,,' .81, 3,',' I
" 16996'1-141.\2" WLEG,ID= 3.958" I
L~~ ~~~~ ~~ ~ ~ ~ ~ ~ ~ ~ ~ : .ll 7"WINDQW @71S5'
I FI~ H - PDS STP(0712"1t)~)(Sæ AWGRS) H UNKNOWN ~
I ~ TAG,I-i 7270' 1----
BJ<R HUGHES HOOI<WALL HA.NGffi - 7349'
ID = 4.125"
IRA TAG l-l 7497" r--
Pffi FORA TION 'SUtvMA. RY
RB=' LOG:
ANGLEA T TOP PffiF:
Note: Refer to ProdlJction DB for his:torical perf data
SLZE SPF NTffiVAL OpnlSqz DA TE
4112" SL T OBA 7231.11266 0 06.04.02
4112" SL T OBC 7428-11268 0 06.04.02
4 112" S L T OB D 7752 - 11277 0 06.04.02
17" CS G, 26#, l: 80, ID = 6276" l-i 7781'
I PBTD l-i 11320' I
DA TE REV BY C OMtrÆN TS
00/15102 DA V/KK OR IGINAL CO tvPLETION
CflIUlIQ2 C\lVSltlh CORRECTED DEPTHS
CflI24lQ2 AM THtUh CORRECTIONS BY RIG ENGR
CflßJIQ2 JMlKA.K FISH & DEPTH CORRECTIONS
08100102 J LM'KK RJ LL FISH
~
L
ð---1
I
I
~
7.120' -11310'6-118"OBALATE RÞL ,ID = 3:958"
7163" 1--17" X q' B KR SO 1 R PKR. ID = 4ûQ" I
7232' 1-4112"HES XN NIP, ID = 3.725" I
7244' 1-I4112W LEG, ID = 3958"1
.. L: : : : ~ ~ ~ ~ ~ ~ ~ ~ :.~ ~ ~ ~ :ll
7" WNDO'úJI@7363'
7.349' "' 11311' 6-1 If/' OBC LATE RÞL, ID= 3.958"
z -- 7617" I-iT' X 5" BKR ZXP LNR TO P PKR,ID= 4.410" I
I 7731' H 4 112" X 3- 112" XO. ID = 2.992" I
I 7T3fJ 1-i3.1l2" HES XN NP. ID = 2.700" I
I
~
DA TE REV BY
~
COWEN TS
H ELM) IT NOT LOGG8:>
7617' -11320' 6-118" OBD LATER,l!L ,ID = 3,958"
PRUDHOE BA.Y UNIT
WE3...L: W.203. W.2æ L1, W.2æ L2
ÆR MT Nos: 2020970 (900) (990)
A PI Nos: 50. 02B- 23087. 00 (60) (61)
BP 8<plor:c:tion (Alaska)
)
qOd~o9J
1135L/
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comrn.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
September 19, 2002
'v-./
RE: MWD Formation Evaluation Logs: 1-203 POLARIS,
AK-MW-22078
.J... ~-203 Polaris:
Digital Log Images:
50-029-23087-00
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
Si~~_¿ OOßpJ
RECE\Vt':L)
DEC 06 2002
Ala~..ka Q~'¡ ö\ Gas Coos. Corn.mi~n
, Anchoæge
lr3s
CÆJ I',
)
WEL~ LOG
TRA'NSM1"AL
')
01 O~- OCJ 7
110J~
ProActive Diagnostic Services, Inc.
To:
State of Alaska AOGCC
333 W. 7lhStreet
Suite # 700
Anchorage, Alaska 99501
RE:
Distribution - Final Print( s]
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of
this transmittal letter to the attention of :
Joey Burton / Jeni Thompson
ProActive Diagnostic Services, Inc.
P. O. Box 1389
Stafford, TX 77497
BP Exploration (Alaska), Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, AK 99508
WELL
DATE
LOG
TYPE
DIGITAL
OR
CD-ROM
1
MYLAR /
SEPIA
FILM
1
BLUE LINE
PRINT(S)
REPORT
OR
COLOR
Open Hole
1
W203
7 /24/02
Res. Eva!. CH
1
1
1
Mech. CH
1
Caliper Survey
Signed:
c7f~{J7oo~
" ... ....., ... - ~
..¡ ~~:"'~ ~" 'il i, hI ~' .'-\
, " ,,~~ç t. ~,~ ;'C; ~-:-,.:
Date:
Print Name:
JUL30 "
.' ,'&:~ . . ;:.. :.:
.. ri-:,...
r~:~t
PROACTivE DiAGNOSTic SERVicES, INC., } 10 K STREET SUÌTE 200, ANC~ORAGE, AK 99~01
Phone:(907) 245-8951 Fax:(907) 245-8952 E-mail: pdsanchorage@memorylog.com Website: \nn\'.mel1lorylog.com
Schlußl~erger
Alaska Data and Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
...-.
Well
Job#
Log Description
W-203 dD~-()qí
FLOWING BOTTOM HOLE PRESS/GLS
~
Date
07/07/02
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc,
Petrotectnical Data Center LR2-1
900 E Benson Blvd.
Anchorage AK 99508-4254
RECEIVED
Date Delivered:
JUL 26 2002
~ QJi & Gas Cons. CQmmi .
AncbPllBt . UQ88lOn
NO. 2243
07/19/02
Company: Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field:
Polaris
Color
Sepia
Schlumberger DCS
3940 Arctic Blvd Suite 300
Anchorage AK 99503-5789
ATTN: Sherrie
Received~
BL
CD
{ -,-001 f"~
Scbl.~epger
Alaska Data and Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
,--
Well
Job#
W-203 l""'7.0~-{)9,
22307 USIT
~-
Log Description
Date
06/02102
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E Benson Blvd. Ot:CeI;IVEr'
Anchorage AK 9950~ - 1-#
Date Delivered:
'U' "'" I' I'!('\I'\<)
II ¡ ~1 :'''\ ¡,:: '/
V '- Lv... '."''' ~
Alaska O~ & Gti:3 CmE:. G¡;mm¡zsicn
Anchc-rafj9
NO. 2261
07/25/02
Company: Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field:
Polaris
Color
Sepia
2
Schlumberger DCS
3940 Arctic Blvd Suite 300
Anchorage AK 99503-5789
A TIN: Beth
Re~
BL
CD
(-<-~r
~
) STATE OF ALASKA )
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well
181 Oil 0 Gas 0 Suspended 0 Abandoned 0 Service f-'\""'"''
2. Name of Operator '~'~'~i." 7. Permit Number
BP Exploration (Alaska) Inc. i ~ ¡ 202-097
3. Address ;~~~~
P.O. Box 196612, Anchorage, Alaska 99519-6612 L~~~~;~~~4
4. Location of well at surface ,'" .. ""''',
3668' NSL, 11971 WEL, SEC. 21, T11N, R12E, UM ~ 4_~mJlï¡X'r"',)N "
At top of productive interval ~ iJ¡.TE
2768' NSL, 3516' EWL, SEC. 22, T11N, R12E, UM (OBd) ,: _..?..:/5:-:.q?.-- ~
At total depth ~ 'ìt? ;f' 8: ~
2021 SNL, 484' EWL, SEC. 26, T11 N, R12E, UM ~ .--ß.1------- -,
5. Elevation in feet (indicate KB, OF, etc.) 6. Lease Designation and Serial No.
KBE = 87.14' ADL 028264
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband.
5/24/2002 6/4/2002 6/15/2002
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
11320 5214 FT 11320 5214 FT 181 Yes 0 No
22. Type Electric or Other Logs Run
MWD, GR, RES, PWD, DEN, NEU, USIT, CCL, ABI
23, CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE Top BOTTOM SIZE CEMENTING RECORD
2011 X 3411 215.5# A53 Surface 104' 4811 260 sx Arctic Set (Approx.)
9-5/811 40# L-80 34' 4065' 12-1/411 640 sx PF 'L', 274 sx Class 'G'
7" 26# L-80 31' 77811 8-3/411 451 sx Class 'D-600G' Latex
4-1/211 12.6# L-80 7617' 11320' 6-1/811 Uncemented Slotted Liner
Classification of Service Well
8. API Number
50- 029-23087-00
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
W-203
11. Field and Pool
Prudhoe Bay Field / Polaris Pool
(Undefined)
15. Water depth, if offshore 16. No. of Completions
N/A MSL Onft
20. Depth where SSSV set 21. Thickness of Permafrost
(Nipple) 2403' MD 1900' (Approx.)
AMOUNT PUllED
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
4-1/211 Slotted Liner
MD TVD
7752' - 11277' 5199' - 5213'
MD
TVD
TUBING RECORD
SIZE DEPTH SET (MD)
4-1/2", 12.6#, L-80 69961
4-1/211, 12.6#, L-80 7165' - 7244'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect with 81 Bbls of Diesel
PAC,KER SET (MD)
68941
71651
25.
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
June 22, 2002 Gas Lift
Date of Test Hours Tested PRODUCTION FOR Oll-Bsl
7/6/2002 4 TEST PERIOD 2410
Flow Tubing Casing Pressure CALCULATED Oll-BSl
Press. 24-HoUR RATE
?8. CORE DATA [} [ (' F ~ \ l
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit cðrê dhip's: '" t, ,
GAs-McF
1256
GAs-McF
WATER-BBl
0
WATER-BBl
CHOKE SIZE
1760
all GRAVITY-API (CORR)
GAS-Oil RATIO
521
~, "
:. ¡
I:"~\"
No core samples were taken.
~.~ --. i.~r.'\'''''.~"l:
i111 ~ --! c.:.üU{.
'-' 1,..-
Form 10-407 Rev. 07-01-80
(",\ f~"', "
cl ¡ ~
UI ¡
Alaska Oil & Gas Cons. LomffilSS1Ol1
Anchorage
Grr
/:1bSDMS BFl
d\f.-
JUL 29 2002 Submit In Duplicate
29.
Ma
Mb1
Mb2
Mc
Na
Nb
Nc
OA
)
OBa
Geologic Markers
Marker Name Measured True Vertical
Depth Depth
62331 45831
6320' 46321
64261 46911
65341 47501
66441 48081
66971 48361
6791' 4883'
7005' 4981'
7137' 5037'
72471 50801
73661 5119'
75871 51741
)
30.
Formation Tests
OBd
OBc
OBd
31. list of Attachments:
Summary of Daily Drilling Reports, Surveys
Include interval tested, pressure data, all fluids recovered and
gravity, GOR, and time of each phase.
g"" r~1 ~
IC It ~
I¡"""
I¡'.~
fj
I'.~'""",
;! \ 1 '") .',.
\,..1 ,) ~.. {, J
A(aska Oil 8~ bas t:ons.l;omm¡ssïon
Anchorage
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Terri.HUbbl~J\J\ÌR. ~ TiUe Technical Assistant
W-203 202-097
Well Number Permit No. / Approval No.
INSTRUCTIONS
Date ()7'~1.Ó~-
Prepared By NameINumber: Terrie Hubble, 564-4628
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
k \. ~ \",..,
Form 10-407 Rev. 07-01-80
l 1\"
Legal Name: W-203
Common Name: W-203
Test Date
5/29/2002
6/2/2002
FIT
FIT
Test Type
Test Depth (TMD)
4,065.0 (ft)
7,781.0 (ft)
BP
Leak-Off TestSumrnary
TestDepth(TVD)
3,212.0 (ft)
5,204.0 (ft)
SunacePresslIre
430 (psi)
705 (psi)
AMW
9.00 (ppg)
9.00 (ppg)
Leak()ff Pl'essur~ (i:JHP)
1,932 (psi)
3,138 (psi)
EMW
11.58 (ppg)
11.61 (ppg)
---
-~
Printed: 6/17/2002 11 :29:27 AM
')
BP
,()p~rationsSurnmary Rèport
Paget öf 8
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-203
W-203
DRILL +COMPLETE
DOYON
DOYONt4
Start: 5/23/2002
Rig Release: 6/15/2002
Rig Number:
Spud Date: 5/23/2002
End: 6/15/2002
Date From ~ To Hours Task Code NPT Phase Description of Operations
5/22/2002 03:30 - 04:30 1.00 MOB P PRE Slide rig floor into moving position.
04:30 - 07:30 3,00 MOB P PRE Move rig off W-08A and spot over well W-203.
07:30 - 08:00 0.50 MOB P PRE Slide rig floor into drilling position
08:00 - 11 :30 3.50 RIGU P PRE Accept rig at 08:00 5/22/02, NU surface hydril and diverter
system while taking on spud mud.
11 :30 - 13:00 1.50 RIGU P PRE Load HWDP in pipe shed and strap. PU BHA to rig floor.
Change jaws in iron roughneck,
13:00 - 13:30 0.50 RIGU P PRE PU HWDP, jars, flex DCs and rack in derrick,
13:30 - 14:00 0.50 RIGU P PRE Function test diverter.
14:00 - 15:30 1.50 DRILL P SURF Continue to PU HWDP.
15:30 - 16:00 0.50 DRILL P SURF Fill surface stack and check for leaks. Test mud line to 3,500
psi.
16:00 - 16:30 0,50 DRILL P SURF MU BHA.
16:30 - 17:00 0,50 DRILL P SURF Pre spud meeting,
17:00 - 00:00 7,00 DRILL N WAIT SURF Ready to spud well. Rig on standby starting at 17:00 due to
cuttings disposal issue related to Kuparuk River bridge outage,
Contiue to MU BHA. PU 5" DP needed for intermediate hole
section.
5/23/2002 00:00 - 00:00 24.00 DRILL N WAIT SURF Standby due to lack of cuttings disposal options related to
Kuparuk Bridge outage. Replace chains on mud pumps, Strap
and rabbit 9 5/8" casing. Clean 7" casing,
5/24/2002 00:00 - 17:00 17,00 DRILL N WAIT SURF Standby due to lack of cuttings disposal options related to
Kuparuk River bridge outage,
17:00 - 17:30 0,50 DRILL P SURF Upload to MWD.
17:30 - 00:00 6,50 DRILL P SURF Drill from 104' to 434'. AST=1.3, ART=2.47.
5/25/2002 00:00 - 16:00 16.00 DRILL P SURF Drill from 434' to 1,302'. Not achieving required build rate.
AST=13.31, ART= 0.58.
16:00 - 17:00 1.00 DRILL P SURF Cbu. Flow check. Well static.
17:00 - 18:30 1.50 DRILL P SURF POH, Pump out from 1,176' to 720'. Hole taking proper fluid,
18:30 - 19:00 0.50 DRILL P SURF Stand back BHA.
19:00 - 20:30 1.50 DRILL P SURF Change bit. Down load MWD. Upload MWD, Run BHA in
hole.
20:30 - 21 :00 0,50 DRILL P SURF Service rig,
21 :00 - 21 :30 0.50 DRILL N RREP SURF Repair hydraulic fitting on top drive.
21 :30 - 22:30 1,00 DRILL P SURF RIH and wash last stand to bottom. Approx, 15' of fill.
22:30 - 00:00 1.50 DRILL P SURF Drill form 1,302' to 1,395'. AST=1.0, ART=0.25.
5/26/2002 00:00 - 14:00 14.00 DRILL P SURF Drill from 1,395' to 2,733' building angle, Drilling time from
00:00 to 12:00; AST=7,75, ART=1.54.
14:00 - 15:00 1.00 DRILL P SURF Circulate hole clean.
15:00 - 16:30 1,50 DRILL P SURF Wiper trip to 1,270'. Pump out of hole from 2,340' to 2,240'
and 1,685' to 1,270'.
16:30 - 17:30 1.00 DRILL P SURF RIH. Work through tight hole from 1,535' to 1,735' with 40
spm.
17:30 - 00:00 6.50 DRILL P SURF Drill from 2,733' to 3,594'. Drilling time from 12:00 to 24:00;
AST=1.53, ART=5.81.
5/27/2002 00:00 - 04:00 4.00 DRILL P SURF Drill from 3,594' to surface hole TO at 4,078'. ART=2.22,
AST=0.33.
04:00 - 05:00 1.00 DRILL P SURF Circulate hole clean at 650 gpm, 100 rpm with low viscosity
sweep.
05:00 - 08:00 3,00 DRILL P SURF Wiper trip to 1,716'. Work tight spots at tool joints from 3,805'
to 2,960' without pump. Pump and back ream out of hole as
needed to 1,812', RIH w/o problems.
08:00 - 09:00 1,00 DRILL P SURF Circulate hole clean at 650 gpm, 2,700 psi, 100 rpm with
Printed: 6/17/2002 11 :29:36 AM
)
)
Page 20f 8
BP
Oper~tlonsSummary ,Report
Legal Well Name: W-203
Common Well Name: W-203
Event Name: DRILL +COMPLETE
Contractor Name: DOYON
Rig Name: DOYON 14
Date From - To Hours I Task Code NPT
5/27/2002 08:00 - 09:00 1.00 DRILL P
09:00 - 11 :00 2.00 DRILL P
11 :00 - 12:00 1.00 DRILL P
12:00 - 12:30 0.50 DRILL P
12:30 - 14:00 1.50 CASE P
14:00 - 21 :30 7.50 CASE P
21 :30 - 22:00 0.50 CASE P
22:00 - 23:30 1.50 CASE P
23:30 - 00:00 0.50 CASE P
5/28/2002 00:00 - 01 :00 1.00 CASE P
01 :00 - 04:30 3.50 CEMT P
04:30 - 05:00 0.50 CEMT P
05:00 - 06:30 1.50 DIVRTR P
06:30 - 07:30 1.00 BOPSURP
07:30 - 10:30 3.00 BOPSURP
10:30 - 12:00 1.50 BOPSURP
12:00 - 13:30 1.50 BOPSURP
13:30 - 17:30 4,00 BOPSUR P
Phase
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
SURF
INT1
INT1
INT1
INT1
INT1
17:30 - 18:00 0.50 BOPSUR P
18:00 - 18:30 0,50 BOPSUR P
18:30 - 19:00 0.50 DRILL P
19:00 - 20:00 1.00 DRILL P
20:00 - 21 :00 1.00 DRILL P
21 :00 - 21 :30 0.50 DRILL P
21 :30 - 22:30 1.00 DRILL P
22:30 - 23:00 0.50 DRILL P
23:00 - 00:00 1.00 DRILL P
5/29/2002 00:00 - 01 :00 1,00 DRILL
01 :00 - 01 :30 0.50 DRILL
01 :30 - 02:00 0.50 DRILL
02:00 - 02:30 0.50 DRILL
02:30 - 03:00 0.50 DRILL
03:00 - 05:30 2.50 DRILL
05:30 - 06:00 0,50 DRILL
06:00 - 06:30 0.50 DRILL
06:30 - 12:00 5.50 DRILL
12:00 - 17:30 5.50 DRILL
17:30 - 18:30 1,00 DRILL
18:30 - 20:30 2.00 DRILL
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
INT1
Start: 5/23/2002
Rig Release: 6/15/2002
Rig Number:
Spud Date: 5/23/2002
End: 6/15/2002
Description of Operations
weighted sweep.
Flow check. Well static, Pump dry job and POH, Hole in good
shape, no circulating or back reaming needed on TOH.
LD BHA.
Clear floor of BHA.
RU to run 9 5/8" casing.
Run 98 joints of 95/8", 40#, L-80, BTC casing with 1 Tam port
collar to 4,065'.
PU landing joint and land casing.
Circulate and condition mud. Stage up circulation rate to 9
bpm, Reciprocate string while conditioning mud for cement job.
Install cement head.
Circulate / condition mud for cementing
'9 bpm at 550 psi, PU WT 180K, SO WT 125K
Cement as per program,
Plug bumped to 1400 psi
Rig down cement equipment
Nipple down diverter, riser
Nipple up well head
Nipple up BOPE, riser, flowline
Rig up to pressure test BOPE
Run test plug, pull and redress test plug rubber
Run test plug
Pressure test BOPE as per AOGCC / BP regulations
PT annular to 250 / 2500 psi
PT all BOPE to 250/3500 psi
Rig down pressure test equipment
Run wear bushing
PU, MU bales / elevators
PU, MU, directional BHA
Upload MWD
PJSM, load nuclear sources in to MWD
Trip in, at 936', rotate at 10 RPM through TAM collar
Pressure test casing to 1000 psi, confirm TAM closed
Well control drill D 5
Trip in to 3980'
Rig service, slip / cut drilling line
Service top drive
Trip in to 3980', tag cement
Circulate bottoms up, 10 bpm at 1550 psi
Well control drill, D 5
Pressure test casing to 3000 psi for 30 minutes
Record on chart
Drill cement from 3980' to 4065', drill new wellbore from
4078' to 4098'. Begin mud swap on the fly.
Circulate bottoms up, C/O to new 9 ppg LSND mud
FIT to 11.6 ppg, applied surface 430 psi
Directional drill 8 3/4" wellbore from 4098' to 5105'
ART 3.8, AST 0.16, ADT 3,96
Directional drill from 5105' to 6091'
Circulate sweep from surface to surface
Wiper trip, 22 stands, pull 8, sticky, pull 2, swab 1,5 bbls,
pump out 5, hole fill OK, pull 7, flow checks OK
Printed: 6/17/2002 11 :29:36 AM
)
)
BP
Operations SUmmary Report
Page'30f8
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-203
W-203
DRILL +COMPLETE
DOYON
DOYON 14
Start: 5/23/2002
Rig Release: 6/15/2002
Rig Number:
Spud Date: 5/23/2002
End: 6/15/2002
Date From - To Hours Task Code NPT Phase Description' of Operations
5/29/2002 20:30 - 21 :00 0.50 DRILL INT1 Rig service, service top drive
Circulate bottoms up at shoe
21 :00 - 22:00 1.00 DRILL INT1 Trip back to bottom, wellbore in good condition,
Wash last stand down
22:00 - 00:00 2.00 DRILL INT1 Directional drill 8 3/4" wellbore from 6091' to 6300'
ART 3.97, AST 0.9, ADT 4,87
5/30/2002 00:00 - 12:00 12.00 DRILL P INT1 Directional drill 8 3/4" wellbore from 6300' to 7337'
AST 4.9, ART 3.9, ADT 8,8
12:00 - 16:30 4.50 DRILL P INT1 Directional drill from 7337' to 7791'
AST 1.89, ART 2.11, ADT 3
16:30 - 18:00 1.50 DRILL P INT1 Circulate weighted sweep surface to surface
18:00 - 20:00 2.00 DRILL P INT1 Wiper trip to 6000', wellbore in good condition
20:00 - 23:00 3.00 DRILL P INT1 Circulate hi vis weighted sweep surface to surface,
Circulate second hi vis weighted sweep to clean up
wellbore and shakers, shakers clean
Pump 290 bbl liner running pill
23:00 - 00:00 1.00 DRILL P INT1 Flow check, pump dry job, POOH LDDP
5/31/2002 00:00 - 05:30 5.50 DRILL P INT1 Lay down drillpipe, wellbore in good condition
05:30 - 08:00 2.50 DRILL P INT1 Lay down BHA, remove sources, download MWD
08:00 - 08:30 0.50 CASE P INT1 Pull wear bushing
08:30 - 10:00 1,50 CASE P INT1 Rig up to run casing, Franks Tool, C/O bales
10:00 - 11 :00 1.00 CASE P INT1 PU, MU, float shoe jt / float collar jt, fill, check floats
11 :00 - 15:30 4.50 CASE P INT1 Run 7" casing, ran 190 jts of 26#, L-80, BTC,
Total length w/ shoe, float, pups 7749.99' landed at
7781.34' MD
15:30 - 17:00 1.50 CASE P INT1 Circulate at shoe 7 bpm at 710 psi. No losses during TIH or
while circulating/conditioning.
17:00 - 19:30 2.50 CASE P INT1 Get up and down wts. at shoe. Run casing with no tight hole
conditions. Hole giving back proper displacement during trip in.
19:30 - 20:00 0.50 CASE P INT1 PU, MU, landing jt, land casing, rig down casing running
tools
20:00 - 21 :00 1.00 CASE P INT1 Break circulation slowly and stage up to 7 bpm at 780 psi,
PJSM w/ cementers
21 :00 - 21 :30 0.50 CASE P INT1 Rig down Franks Tool, rig up cementers head,
Circulate to condition mud for cementing, 7 bpm
21 :30 - 23:30 2.00 CEMT P INT1 Cement as per program. Reciprocate until 15 bbls. from
bump. No adverse hole conditions or packing off during
circulation, prior to, or during cement job.
23:30 - 00:00 0.50 CEMT P INT1 Rig down cement equipment
6/1/2002 00:00 - 01 :00 1.00 BOPSUR P INT1 Install pack off, pressure test to 5000 psi
01 :00 - 01 :30 0.50 CASE P INT1 Clear rig floor, cement / casing tools
Function blind rams
01 :30 - 03:30 2.00 DRILL P PROD1 C/O top pipe rams to 2 7/8" x 5"
C/O saver sub on top drive to 3 1/2" IF
03:30 - 04:00 0,50 DRILL P PROD1 Pressure test rams to 250 low, 3500 high
04:00 - 04:30 0.50 DRILL P PROD1 Run wear bushing
04:30 - 06:00 1.50 DRILL P PROD1 Load pipe shed w/ 3 1/2" DP, tally, strap
06:00 - 12:00 6,00 DRILL P PROD1 PU, MU, 31/2" DP, rabbit, RIH to 7630'
12:00 - 14:30 2.50 DRILL P PROD1 Circulate drillpipe clean at 8,5 bpm, 2400 psi
Contaminated mud to surface, treat mud
14:30 - 15:30 1.00 DRILL P PROD1 Freeze protect annlus, formation broke at 750 psi
Little Red pumped 65 bbls dead crude at 2.5 bpm,
1600 psi
Printed: 6/17/2002 11 :29:36 AM
')
')
BP
Operations SUm maryReport
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-203
W-203
DRILL +COMPLETE
DOYON
DOYON 14
Date
From - To Hours Task Code NPT Phase
6/1/2002
15:30 - 17:30 2,00 DRILL P
17:30 - 18:00 0,50 DRILL P
18:00 - 21 :00 3,00 DRILL P
21 :00 - 21 :30 0.50 DRILL P
21 :30 - 22:30 1.00 DRILL P
22:30 - 00:00 1.50 DRILL P
00:00 - 04:00 4.00 DRILL P
04:00 - 04:30 0,50 DRILL P
04:30 - 07:00 2.50 DRILL P
07:00 - 08:30 1.50 DRILL N
08:30 - 09:30 1.00 DRILL N
09:30 - 10:00 0.50 DRILL N
10:00 - 10:30 0.50 DRILL P
10:30 - 12:00 1.50 DRILL P
12:00 - 12:30 0.50 DRILL P
12:30 - 13:30 1,00 DRILL P
13:30 - 15:00 1.50 DRILL P
15:00 - 15:30 0,50 DRILL P
15:30 - 17:00 1.50 DRILL P
17:00 - 18:00 1.00 DRILL P
18:00 - 18:30 0.50 DRILL P
18:30 - 19:00 0,50 DRILL P
19:00 - 19:30 0.50 DRILL P
19:30 - 00:00 4,50 DRILL P
6/2/2002
6/3/2002 00:00 - 12:00 12.00 DRILL P
12:00 - 14:00 2.00 DRILL P
14:00 - 15:30 1.50 DRILL P
15:30 - 17:00 1.50 DRILL P
17:00 - 00:00 7.00 DRILL P
6/4/2002 00:00 - 11 :00 11.00 DRILL P
11 :00 - 12:30 1,50 DRILL P
12:30 - 14:30 2.00 DRILL P
14:30 - 16:00 1.50 DRILL P
16:00 - 17:00 1.00 DRILL P
17:00 - 19:30 2,50 DRILL P
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
DFAL PROD1
DFAL PROD1
DFAL PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
Page 4 of a
Start: 5/23/2002
Rig Release: 6/15/2002
Rig Number:
Spud Date: 5/23/2002
End: 6/15/2002
Description of Operations
Blow down top drive, POOH, rack back DP
Rig up to run 3 1/2" DP
Function blind rams
PU, MU, 31/2" DP, rabbit, RIH
Circulate drillpipe clean at 8.5 bpm at 2400 psi
Blow down top drive, POOH, rack back DP
Run USIT log wI Schlumberger
Run USIT,CCL,GR log wI Schlumberger
Rig down loggers
PU, MU BHA, upload MWD, orient, test MWD
Trouble shoot ABI problem, communication from MWD to
ABI
C/O mud motor, ABI sensor failure
Function test mud motor ABI I MWD
PJSM, load nuclear sources
Trip in directional BHA
Rig service
Trip in to 7590'
Rig service, slip I cut drilling line, service top drive
Circulate casing
Pressure test casing to 3000 psi, record on chart
Wash from 7590' to 7688', tag cement, drill cement to
7697', top of float collar, drill cement to 7783' top of float
shoe
Displace to new Baradril 9,0 ppg mud
Directional drill from 7791' to 7811', 20' new hole
Clean mud tanks, shakers, flow lines for new mud
FIT to 11,6 ppge, applied surface pressure 705 psi, 5204
TVD with 9ppg mud.
Directional drill 6 1/8" lateral # 1 wellbore
Drill from 7811' to 8161'
AST 1.49, ART 1.75, ADT 3.24
Directional drill 6 1/8" lateral # 1 production wellbore
From 8161' to 9230'
AST 1.34, ART 6.45, ADT 7.79
Directional drill from 9230' to 9495'
Circulate sweep surface to surface, circulate untill
shakers clean, flow check
Wiper trip from 9495' to 7780', flow checks
Wellbore in good condition
Directional drill from 9495' to 10261'
AST 0.82, ART 4.18, ADT 5
Directional drill 6 1/8" lateral # 1 production wellbore
From 10621' to 11320', TO
AST 0.57, ART 5,31, ADT 5.88
Circulate weighted sweep surface to surface
Circulate untill shakers clean, flow check
Wiper trip from 11320' to 9450'
Wellbore in good condition
Circulate weighted sweep surface to surface
Circulate liner running pill, 150 bbls, 2 % lubricants
Flow check, trip out, SLM, record drill string parameters
Printed: 6/17/2002 11:29:36AM
)
)
BP
Operations SumrnaryRep.ort
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
6/4/2002
6/5/2002
6/6/2002
6/7/2002
W-203
W-203
DRILL +COMPLETE
DOYON
DOYON 14
Date
From"" To Hours Task Code NPT Phase
19:30 - 20:00
0.50 DRILL P
PROD1
20:00 - 22:30
22:30 - 00:00
2.50 DRILL P
1.50 DRILL P
PROD1
PROD1
00:00 - 01 :30
01 :30 - 02:00
02:00 - 05:30
1,50 DRILL P
0.50 CASE P
3.50 CASE P
PROD1
PROD1
PROD1
05:30 - 06:30 1.00 CASE P
06:30 - 08:00 1.50 CASE P
08:00 - 08:30 0.50 CASE P
08:30 - 10:00 1.50 CASE P
10:00 - 10:30 0.50 CASE P
10:30 - 11 :30 1.00 CASE P
11 :30 - 14:00 2,50 CASE P
14:00 - 14:30 0,50 BOPSUR P
14:30 - 15:30 1,00 BOPSUR P
15:30 - 18:30 3.00 BOPSUR P
18:30 - 19:00 0.50 BOPSUR P
19:00 - 19:30 0.50 BOPSUR P
19:30 - 22:30 3.00 STWHIP P
22:30 - 00:00 1.50 STWHIP P
00:00 - 02:30 2,50 STWHIP P
02:30 - 03:00 0.50 STWHIP P
03:00 - 07:00 4.00 STWHIP P
07:00 - 07:30 0.50 STWHIP P
07:30 - 12:00 4.50 STWHIP P
12:00 - 13:30 1,50 STWHIP P
13:30 - 14:00 0,50 STWHIP P
14:00 - 14:30 0,50 STWHIP P
14:30 - 16:00 1.50 STWHIP P
16:00 - 17:00 1.00 STWHIP P
17:00 - 17:30 0.50 STWHIP P
17:30 - 18:00 0.50 STWHIP P
18:00 - 22:30 4.50 DRILL P
22:30 - 00:00 1.50 DRILL P
00:00 - 01 :00 1.00 DRILL P
01 :00 - 01 :30 0.50 DRILL P
01 :30 - 02:30 1.00 DRILL P
02:30 - 12:00 9.50 DRILL P
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
Pag~5 of 8
Start: 5/23/2002
Rig Release: 6/15/2002
Rig Number:
Spud Date: 5/23/2002
End: 6/15/2002
Descriþtion' of Operations
Log for RA tag w/ MWD, 7497.41' pump dry job, blow
down TDS, drop rabbit
Flow check, trip out in casing
Recover rabbit on top of jars, 7635' DP drifted
Stand back jars / 2 DCs, PJSM, remove sources
Download MWD, SLM no correction
Download MWD, LD BHA
Rig up tools to run 4 1/2" liner
Ran 4 1/2" 12.6#, BTC, L-80, 120 jts slotted,
3 jts solid, w/ shoe, packoff bushing, X/O's, XN nipple,
HMC hanger, ZXP packer, total length 3702,71'
PU, MU, HMC hanger, ZXP packer,
Trip liner in on DP to 7781', weights every 1000'
Circulate bottoms up, 40 spm at 450 psi
Trip liner in on DP to 11,320', tag up, weights every
1000'
Circulate bottoms up, 55 spm at 1240 psi
Set hanger, set packer, pressure test packer to 1600 psi
Packer top at 7617.29'
Flow check, pump dry job, POOH
Pull wear bushing
Rig up to pressure test BOPE
Pressure test BOPE as per AOGCC / BP regs
Test waived by Jeff Jones of AOGCC
Rig down pressure test equipment
Run wear bushing
PU, MU, rabbit, 7 DP, 8 DC, 18 HWDP, RIH
Circulate to flush out pipe bore, rack in derrick
RIH w/ MWD, load probe, upload MWD
MU whipstock assembly
Upload MWD, surface test
Trip in whipstock BHA, trip speed 120 seconds / stand
Fill pipe every 20 stands, 7307'
Orient whipstock, tag / set at 15 degrees left / high side
Top 7326', bottom 7363'
Mill window from 7363' to 7394'
Displace to new mud, circulate casing clean
Flow check, POOH to 6000'
Flow check, pump dry job, blowdown top drive
Trip out to BHA
LD 2 x HWDP, rack back HWDP, DCs, LD bumper sub
subs, mills, mills in gauge
Clear rig floor
Circulate and flush BOP stack
PU, MU, directional BHA, MU MWD, install probe, upload,
C/O probe, upload, load sources, surface test
Trip in directional BHA
Trip in directional BHA to 7300'
Orient tool face to high side
Rig service, slip / cut drilling line, service top drive
Directional drill lateral # 2, production wellbore
From 7394' to 8,305'
AST 1.95, ART 3,27, ADT 5.22
Printed: 6/17/2002 11 :29:36 AM
)
')
BP
Operations Summary Report
Page 6 of 8
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-203
W-203
DRILL +COMPLETE
DOYON
DOYON 14
Date
From - To Hours Task Code NPT Phase
6/7/2002
12:00 - 20:00 8.00 DRILL P
20:00 - 21 :00 1.00 DRILL P
21 :00 - 22:30 1.50 DRILL P
22:30 - 22:45 0.25 DRILL P
22:45 - 00:00 1,25 DRILL P
00:00 - 12:00 12,00 DRILL P
PROD2
PROD2
PROD2
PROD2
PROD2
6/8/2002
PROD2
12:00 - 19:00 7.00 DRILL P
19:00 - 20:30 1,50 DRILL P
20:30 - 22:00 1.50 DRILL P
22:00 - 23:30 1.50 DRILL P
23:30 - 00:00 0,50 DRILL P
6/9/2002 00:00 - 05:30 5.50 DRILL P
05:30 - 08:00 2.50 DRILL P
08:00 - 09:30 1.50 DRILL P
09:30 - 11 :00 1.50 DRILL P
11:00 -11:30 0.50 DRILL P
11 :30 - 14:30 3.00 DRILL P
14:30 -16:30 2.00 DRILL P
16:30 - 17:00 0.50 DRILL P
17:00 - 17:30 0.50 CASE P
17:30 - 22:00 4.50 CASE P
22:00 - 22:30 0.50 CASE P
22:30 - 00:00 1,50 CASE P
6/10/2002 00:00 - 02:30 2.50 CASE P
02:30 - 03:00 0,50 CASE P
03:00 - 05:00 2,00 CASE P
05:00 - 05:30 0.50 ZONISO P
05:30 - 08:30 3.00 ZONISO P
08:30 - 09:30 1.00 ZONISO P
09:30 - 10:30 1.00 ZONISO P
10:30 - 12:30 2,00 ZONISO P
12:30 - 13:00 0.50 ZONISO P
13:00 - 15:00 2.00 STWHIP P
15:00 - 17:30 2,50 STWHIP P
17:30 - 18:00 0.50 STWHIP P
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
COMP
COMP
COMP
COMP
COMP
COMP
PROD3
PROD3
PROD3
Start: 5/23/2002
Rig Release: 6/15/2002
Rig Number:
Spud Date: 5/23/2002
End: 6/15/2002
Description of Operations
Directional drill from 8305' to 9303'
Circulate sweep surface to surface, take SPRs, Survey
Flow check, wiper trip from 9303' to 7400'
Wellbore in good condition, no mud losses
Fill pipe, wash down last stand
Directional drill from 9303' to 9444'
AST 1.39, ART 3,62, ADT 5.01
Directional drill lateral # 2, 6 1/8" production wellbore
From 9444' to 10,733'
AST 1.42, ART 5.07, ADT 6.49
Directional drill, from 10,733' to 11,341' TO
AST 0,73, ART 2.96, ADT 3.69
Pump sweep surface to surface, survey, SPRs
Flow check, wiper trip from 11,341' to 9210',
Wellbore in good condition
Pump sweep surface to surface
Spot 151 bbl liner pill
Flow check, drop 2" rabbit, SLM
Good window exit
Trip out directional BHA,
Flush BHA, remove sources, download MWD, upload
MWD, LD motor,
MU whipstock hook BHA, orient MWD, surface test MWD
Trip in whipstock hook BHA to 7283'
Wash from 7283' to 7367', orient, latch on to whipstock,
pull 185k, 55k over string, pull tail assembly out of liner #
1, lost 3 bbls mud
Flow check, dry job, trip out whipstock
Rack DCs, download MWD, LD whipstock, tail assembly,
seal assembly, function blind rams
Clear rig floor
Rig up to run 4 1/2" liner
Ran 130 jts slotted, 2 jts solid, 2 pup jts, total length wi
hanger 3962.14',
Rig down liner running equipment, rig up to run 3 1/2"
DP
Trip liner in on 3 1/2" DP to window
Trip in wi 4 1/2" liner, # 2
Orient, set liner window hook,
Drop ball, pressure to 2000 psi, pump to 3000 psi to
shear ball seat
Flow check, dry job, Trip out liner running BHA
PU, MU, SC-1 R production packer wi tail assembly
Trip packer in to 7165'
Set packer at 7165', pressure up to 3500 psi to set. Put
1500 psi on back side. Set 25,000 Ibs on packer.
Rig service, slip I cut drilling line, service top drive
Trip out packer running BHA
Clear rig floor
PU, MU, whipstock, mills, upload MWD, orient MWD,
HWDP, surface test MWD
Trip in whipstock at controlled speed
Orient whipstock, 15 degrees left of high side, set anchor
Printed: 6/17/2002 11:29:36 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
6/10/2002
6/11/2002
6/12/2002
6/13/2002
6/14/2002
)
-)
BP
Operatlons Summary Report
W-203
W-203
DRILL +COMPLETE
DOYON
DOYON 14
17:30 - 18:00
From - To Hours Task Code NPT Phase
PROD3
18:00 - 22:30
22:30 - 23:30
23:30 - 00:00
00:00 - 01 :30
01 :30 - 03:30
03:30 - 04:30
04:30 - 06:00
06:00 - 07:00
07:00 - 10:00
10:00 - 10:30
10:30 - 14:00
14:00 - 16:00
16:00 - 16:30
16:30 - 00:00
00:00 - 09:00
09:00 - 10:00
10:00 - 11 :00
11 :00 - 00:00
00:00 - 01 :00
01 :00 - 02:00
02:00 - 03:00
03:00 - 05:00
05:00 - 09:30
09:30 - 12:30
12:30 - 14:00
14:00 - 16:00
16:00 - 17:00
17:00 - 18:00
18:00 - 20:30
20:30 - 23:00
23:00 - 23:30
23:30 - 00:00
00:00 - 04:30
04:30 - 07:00
0,50 STWHIP P
4.50 STWHIP P
1.00 STWHIP P
0.50 STWHIP P
1.50 STWHIP P
2.00 STWHIP P
1,00 STWHIP P
1.50 STWHIP P
1.00 STWHIP P
3.00 STWHIP P
0,50 STWHIP P
3,50 STWHIP P
2.00 STWHIP P
0.50 STWHIP P
7.50 STWHIP P
9.00 STWHIP P
1.00 STWHIP P
1.00 STWHIP P
13,00 STWHIP P
1.00 STWHIP P
1.00 STWHIP P
1,00 STWHIP P
2,00 STWHIP P
4.50 STWHIP P
3.00 STWHIP P
1.50 STWHIP P
2.00 STWHIP P
1,00 STWHIP P
1.00 STWHIP P
2.50 STWHIP P
2,50 STWHIP P
0.50 STWHIP P
0_50 CASE P
4.50 CASE P
2.50 CASE P
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
Page 7 of 8
Start: 5/23/2002
Rig Release: 6/15/2002
Rig Number:
Spud Date: 5/23/2002
End: 6/15/2002
Description, of Operations
at 20K, shear release bolt 30K. No movement of whipstock
after shear.
Mill window from 7135' to 7147', open hole from 7147' to
7165'
Circulate sweep surface to surface,
Ream window and clean up window
Rig service, service top drive
ready mud pits for displacement
Circulate btms up with sweep. Displace hole with new mud,
POOH for BHA #9.
LD Milling BHA #8.
RU Stack Washer and wash stack,
Pull Wear Bushing. RU BOPE test equipment.
Test BOPE to 250 psi I low for 5 min & 3500 psi I high for 5
min. Test waived by Jeff Jones AOGCC.
RD BOPE test equipment. Install Wear Bushing,
MU Drilling BHA #9: Bit, Mtr, NM Fit sub, NM DC, LWD, PWD,
& Hng off sub. Program & orientate MWD, Shallow test
MWD. PJSM. Load RA source. MU Flex DC's & Jars,
RIH wI BHA #9 on 3 1/2" DP, Fill DP @ 3500'.
Fill DP. Slow pump rates. Orientate bit thru window @ 7147',
no problems.
Directionally drill from TD @ 7165' to 7729', AST 2.92, ART
1.58, ADT 4.5.
Directionally drill fl 7729' - 9209'.
Circulate bottoms up with a sweep. Flow check. OK,
Wiper trip to 7206' Oust ourside window). Hole Slick.
Dirctionally drill fl 9209' - 11211'. AST: 2,36 hr, ART: 8,7 hr,
TDT: 1 0.06 hr.
Directionally drill fl 11211' -11340'. ART: 0.37 hr, AST: 0 hr,
TDT: 0.37 hr. TD Leg #2.
Circulate sweep around. Flow check.
Wiper trip to 9113', RIH to bottom. Hole slick.
Circulate sweep around. Displace open hole with liner pill.
POOH for Whipstock retrieving BHA. SLM. Hole slick, Log
RA tag @ 7090'.
LD BHA #9. Remove RA source. Down load MWD data.
Stand Back MWD I LWD. LD Mud Mtr and bit.
PU Whipstock retrieving BHA #10: Retrieving tool, 1 jt HWDP,
Fit sub, MWD, Magnets, Bumper sub, oil jars, 8 DC's, 1 jt
HWDP. Orientate MWD with Hook. Shallow test MWD.
TIH to 7029',
Slip & cut Drill line. Service Rig.
Finnish TIH to Whipstock @ 7137', PU: 135 K, SO: 110 K.
Orientate Hook tool. Latch whipstock. Pull free @ 170k K.
Flow check. OK. Pump slug.
POOH with Whipstock.
LD BHA & Whipstock, Function Blind rams.
Clear Rig Floor.
RU to run 4.5" liner in Leg #2.
Continue TIH with 4.5" liner.
Change out handling equpipment. MU hook liner hanger. TIH
with 4,5" liner on 3.5" DP. Orientate and exit casing into leg #3
Printed: 6/17/2002 11 :29:36 AM
)
)
BP
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-203
W-203
DRILL +COMPLETE
DOYON
DOYON 14
Date From - To Hours Task Code NPT Phase
6/14/2002 04:30 - 07:00 2.50 CASE P PROD3
07:00 - 08:00 1.00 CASE P PROD3
08:00 - 09:00 1.00 CASE P PROD3
09:00 - 13:00 4,00 CASE P PROD3
13:00 - 16:30 3,50 CASE P PROD3
16:30 - 17:30 1.00 P COMP
17:30 - 19:00 1.50 CASE P COMP
19:00 - 19:30 0.50 CASE P COMP
19:30 - 00:00 4.50 CASE P COMP
6/15/2002 00:00 - 02:00 2.00 P COMP
02:00 - 03:00 1.00 CASE P COMP
03:00 - 04:30 1.50 CASE P COMP
04:30 - 06:30 2.00 CASE P COMP
06:30 - 07:00 0.50 CASE P COMP
07:00 - 08:00 1,00 BOPSUR P COMP
08:00 - 09:00 1.00 WHSUR P COMP
09:00 - 10:30 1.50 WHSUR P COMP
10:30 - 13:30 3.00 WHSUR P COMP
13:30 - 14:00 0.50 WHSUR P COMP
14:00 - 15:00 1.00 WHSUR P COMP
15:00 - 18:00 3.00 WHSUR P COMP
Page a of a
Start: 5/23/2002
Rig Release: 6/15/2002
Rig Number:
Spud Date: 5/23/2002
End: 6/15/2002
Description ,of Operations
with liner. Continue TIH to 7144', PU = 145 K, SO = 100 K.
Hook liner hanger in Leg # 3 window, Drop setting ball.
Pressure up to 4200 psi. Release from hanger. PU = 125 K,
SB one stand DP.
Displace hole with 9,1 ppg KCI. Flow check.
POOH Lay down DP and Running Tool.
Run 46 stands DP from derrick. POOH Lay down DP,
Clear Rig floor.
RU slick line unit. TIH w/ 6" gauge ring and junk basket.
POOH. RD slick line unit.
Pull Wear Bushing. RU tubing handling tools. PJSM.
MU BHA with PLM packer, Baker-Lok everything below
packer. TIH with 4.5" completion string. Total 167 Jts 4.5",
12.6#, L-80, BTC-M Tubing, 16 - 4.5" tubing pup jts, 3 - "X"
Nipples, 3 - Gas Lift Mandrels, 1 - sliding sleeve, and 1
wireline entry guide.
Continue to Run 4.5" completion string.
PU landing Jt. Land tubing hanger in well head. RILDS. RU
test manifold.
Reverse circulate bottoms up. Spot 130 bbls inhibited
seawater in annulus.
Drop packer setting ball. Pressure up to 4200 psi on tubing to
set packer. Bleed pressure to 3000 psi for 30 minute tubing
test. Bleed tubing pressure to 1500 psi. Pressure up annulus
to 3000 psi for 30 minute test. Bleed tubing pressure to 0 to
shear RP valve. Pump 3 BBLs @ 2 BPM, 600 psi through
shear valve.
RD landing jt. Set 2 way check valve in hanger. Test from
below to 1000 psi.
NO BOP stack, Change rams to 4.5" x 7".
NU Xmas tree. Test adapter flange to 5000 psi for 10 min.
Test tree to 250 low / 5 min and 5000 psi high / 5 min,
NU DSM lubricator and pull 2-way check.
RU hot oil truck. Pump 81 BBLs diesel down annulus for
freeze protection. U-Tube freeze protection.
Install BPV in tubing hanger and test from bottom to 1000 psi.
RD hot oil truck. Secure tree.
Prepare rig for mob, Rig Released @ 1800 hrs 06-15-2002 to
S-113.
Printed: 6/17/2002 11 :29:36 AM
ó1 ~.Jo<¡ ~
ft
AOGCC
Attn: Lisa Weepie
333 W. 7th Avenue, Suite 100
Anchorage, Alaska 99501
Re: Distribution of Survey Data for Well W-203 MWD
Dear Sir I Madam:
Enclosed are 2 survey hard copy(s) and 1 disk.
Tie-on Survey:
Window I Kickoff Survey
Projected Survey:
'MD
'MD
11320.00 ' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
II 'I .'-.
" , , ,...00f')
'-'J~ j i ¿ t:.
Alaska Oil & Gas Cons Comm' .
Anchoragè lSSion
r
s-
f "
~
rt
~-
North ",,,;hlska
ØPJfAl-
PBU_WOA WPtMS/øt W.203
w-2.~1IIIIÐ
Job No. AKMW22078, SUNêy&d: 4 June, 2002
SURVEY_PORT
B July, 2_2
Your Ref: API -.2308700
Surface Coordinates: 5958645.16 N, 612049.08 e (70.17' 45.4671- N, 1490 OS' 33.6448" W)
Kelly Bushing: 87. 14ft above Mean Sea Level
...~\M!=i" "-1'1 .v ~~ ,.,
DRILLING .'-hVh..ES
A Halliburton Company
Survey Ref: svy11239
Sperry-Sun lJrilli!.Services .
SurveyRepl»tfor~- -~:.- -: ."AfWD
Yourltef:API-- - :ê.'''''' - - -- - ÐO
Job No. AKMW2201B, SuiVfiyèCI:4June, 2002
BPXA
North Slope Alaska PBU_WOA W Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
0.00 0.000 0.000 -87.14 0.00 O.OON O.OOE 5958645.16 N 612049.08 E 0.00 MWD Magnetic
104.00 0.000 0.000 16.86 104.00 O.OON O.DOE 5958645.16 N 612049.08 E 0.000 0,00
195.18 0.120 269,500 108.04 195.18 0.00 N 0.10W 5958645.16 N 612048.98 E 0,132 -0.08
286.33 0.570 265.200 199.19 286.33 0.048 O.64W 5958645.11 N 612048.44 E 0.494 -0.54
376.18 0.570 237.210 289.03 376.17 0.328 1.46W 5958644.82 N 612047.62 E 0,307 -1,12
463.89 0.450 193.410 376.74 463.88 0.898 1.91 W 5958644.24 N 612047.18 E 0.452 -1.23
554.49 1.190 118.430 467.33 554.47 1.688 1.17W 5958643.46 N 612047.94 E 1,278 -0,19
645.89 3.110 111.440 558.66 645.80 3.048 1.98E 5958642.15 N 612051.10E 2.116 3.22
734.92 5.650 110.930 64 7.43 734.57 5.498 8.32E 5958639.79 N 612057.48 E 2.853 9.94
831.52 7.860 110.650 743.35 830.49 9.528 18.94 E 5958635.92 N 612068.16 E 2.288 21,18
927.14 10.570 113.050 837.73 924.87 15.26 8 33.13 E 5958630.40 N 612082.44 E 2.862 36.36
1022.50 13.410 110.540 931.00 1018.14 22.57 8 51.54 E 5958623.36 N 612100.95 E 3,027 55.98
1115.56 15.210 111.310 1021.17 1108.31 30.79 8 73.02 E 5958615.46 N 612122.55 E 1.945 78,73
1211,36 17.360 109.680 1113.12 1200.26 40.17 8 98.19 E 5958606.46 N 612147.86 E 2,294 105.26
1306.53 19.000 108,910 1203.54 1290.68 49.97 8 126.22 E 5958597.07 N 612176.03 E 1,742 134.49
1402.10 22.340 105.220 1292.94 1380.08 59.79 S 158.47 E 5958587.74 N 612208.42 E 3,750 167.41
1497.98 24.960 102.520 1380.77 1467.91 68.96 8 195.81E 5958579.13 N 612245.90 E 2.956 204.44
1593.55 26,860 101.250 1466.73 1553.87 77.54 S 236.67 E 5958571.15 N 612286.88 E 2,071 244,26
.-
1690.12 29.820 97.420 1551.72 1638.86 84.90 S 281.89 E 5958564.47 N 612332.21 E 3,596 287,27
1785,59 31.660 96.780 1633.77 1720.91 90.93 8 330.32 E 5958559.17 N 612380.72 E 1.958 332.41
1881.38 33.930 94.860 1714.29 1801.43 96.16 8 381.93 E 5958554.71 N 612432.40 E 2.606 379.94
1977,39 39.380 92.700 1791.29 1878.43 99.87 S 439.09 E 5958551.85 N 612489.61 E 5.832 431.57
2070.92 39.210 90.490 1863.68 1950.82 101.528 498.30 E 5958551.08 N 612548.83 E 1.507 483.96
2166.60 39.880 89.390 1937.46 2024.60 101.458 559.21 E 5958552.06 N 612609.74 E 1.01-3 536.99
2262.54 43.200 89.670 2009.26 2096.40 100.938 622.82 E 5958553.52 N 612673.34 E 3.466 592,16
2357,62 45.820 88.280 2077.06 2164.20 99.72 8 689.46 E 5958555.73 N 612739.95 E 2,940 649,62
2454.50 49,510 86.470 2142.30 2229.44 96.41 8 760.98 E 5958560.11 N 612811.41 E 4,051 710.30
2550.17 54.220 85.330 2201.36 2288.50 91.01 S 836.01 E 5958566.63 N 612886.35 E 5.011 773.02
2646.29 55.350 86.440 2256.78 2343.92 85.38 8 914.33 E 5958573.42 N 612964.59 E 1,507 838.49
2742.18 55,120 86.900 2311.46 2398.60 80.80 S 992.97 E 5958579.17 N 613043.15 E 0.461 904,76
- -..-------------
8 July, 2002 - 15:55
Page 20f8
DríllQllest 2.00.08.005
Sperry-Sun"'. 8'lfI.~filJ;.Services .
Survey Report for_103AfWD
Your Ref: API 500292308100
Job No. AKMW22078, surveyed: 4 June, 2002
BPXA
North Slope Alaska PBU_WOA W Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azlm. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
2837.97 54 .440 85.760 2366.71 2453.85 75.80 S 1071.07E 5958585.34 N 613121.16 E 1.204 970,34
--- 2933.43 54.680 87.060 2422.06 2509.20 70.93 S 1148.68 E 5958591.37 N 613198.69 E 1.138 1035.57
3028.35 54.440 89.560 2477.11 2564.25 68.64 S 1225.97 E 5958594.80 N 613275.94 E 2.161 1101.78
3125.50 54.060 88.670 2533.87 2621.01 67.43 S 1304.81 E 5958597.19 N 613354.75 E 0.840 1169,87
3221.80 53.770 89.490 2590.59 2677.73 66.18 S 1382.62 E 5958599.60 N 613432.53 E 0.751 1237,04
3317.42 52.920 91.530 2647.67 2734.81 66.85 S 1459.32 E 5958600.07 N 613509.23 E 1.929 1304.20
3412.26 52.140 92.520 2705.37 2792.51 69.51 S 1534.54 E 5958598.54 N 613584.49 E 1.167 1371.04
3505.85 51.630 96.270 2763.15 2850.29 75.14 S 1607.94 E 5958594.00 N 613657.96 E 3.199 1437,75
3603.22 51.250 97.480 2823.85 2910.99 84.25 S 1683.53 E 5958586.01 N 613733.68 E 1.047 1508.07
3697.95 51.260 95.870 2883.14 2970.28 92.84 S 1756.91 E 5958578.52 N 613807.17 E 1.326 1576,22
3794.11 50,370 100.430 2943.91 3031.05 103.38 S 1830.65 E 5958569.08 N 613881.07 E 3,790 1645.64
3890.02 50.300 98.820 3005.13 3092.27 115.73 S 1903.44 E 5958557.82 N 613954.04 E 1.294 1715.12
3985.64 50.220 98.100 3066.26 3153.40 126.54 S 1976.17 E 5958548.09 N 614026.91 E 0.585 1783,79
4109.12 50.070 98.720 3145.40 3232.54 140.41 S 2069.94 E 5958535.63 N 614120.88 E 0.404 1872.29
4204.73 50.480 95.770 3206.51 3293.65 149.67 S 2142.87 E 5958527.45 N 614193.95 E 2.411 1940,38
4301.61 50.510 96.800 3268.14 3355.28 157.86 S 2217.17 E 5958520.37 N 614268.36 E 0.821 2009.12
4396.79 50.540 97.230 3328.65 3415.79 166.83 S 2290.09 E 5958512.49 N 614341.40 E 0.350 2077.06
4492.56 49.730 92.800 3390.05 3477.19 173.27 S 2363.28 E 5958507.14 N 614414.68 E 3.649 2143.98
4585.56 49,670 94.310 3450.21 3537.35 177.67 S 2434.07 E 5958503.80 N 614485.53 E 1.240 2207.81
4684.56 49.520 94.240 3514.38 3601.52 183.29 S 2509.25 E 5958499.30 N 614560.78 E 0,161 2276.07
4779.44 49,570 92.240 3575.94 3663.08 187.37 S 2581.32 E 5958496.30 N 614632.91 E 1.605 2340.86
4875.42 49.400 92.770 3638.30 3725.44 190.55 S 2654.22 E 5958494.20 N 614705.85 E 0.456 2405.94
4969.82 49,090 94,330 3699.93 3787.07 194.98 S 2725.59 E 5958490.83 N 614777.27 E 1.294 2470.29
5067.35 48.890 92.860 3763.93 3851.07 199.60 S 2799.03 E 5958487.31 N 614850.78 E 1.156 2536.54
5163,45 49.780 95.160 3826.55 3913.69 204.70 S 2871.74 E 5958483.29 N 614923.55 E 2.038 2602,39
5258.72 49.930 93.890 3887.98 3975.12 210.45 S 2944.34 E 5958478.63 N 614996.23 E 1.031 2668.46
5352.92 49.930 94.960 3948.62 4035,76 216.01 S 3016.21 E 5958474.14 N 615068.17 E 0.869 2733.80
5449.82 49.720 95.910 4011.13 4098,27 223.02 S 3089.91 E 5958468.23 N 615141.97 E 0.780 2801.46
5544.68 51,030 97.050 4071.63 4158.77 231.27 S 3162.50 E 5958461.06 N 615214.68 E 1.662 2868,75
5642.03 50.430 96.490 4133.25 4220.39 240.16 S 3237.34 E 5958453.29 N 615289.64 E 0.760 2938,31
--~-------
8 July, 2002 - 15:55
Page 3 of8
DrillQuest 2.00.08.005
Sperry-Sun D,illilgServices .
Survey RefJO!lf(f\",tIlJ311WD
Your Ref: AP'_""óo
Job No. AKMW220'1S, S~:4 June, 2002
BPXA
North Slope Alaska PBU_WOA W Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
5737.70 50.040 95.450 4194.44 4281.58 247.81 S 3310.48E 5958446.73 N 615362.89 E 0.930 3005.79
5832.90 51.000 97.080 4254.97 4342.11 255.83 S 3383.52 E 5958439.80 N 615436.03 E 1.662 3073.36
5927.67 50.680 98.380 4314.82 4401.96 265.72 S 3456.33 E 5958431.00 N 615508.99 E 1.116 3141.64
6023.90 53.190 98.230 4374,15 4461.29 276.66 S 3531.29 E 5958421.18 N 615584.10 E 2.611 3212.32
6118.23 54.330 98.860 4429.91 4517.05 287.96 S 3606.53 E 5958410.99 N 615659.50 E 1.323 3283.42
6215.27 55.580 102.160 4485,64 4572.78 302.47 S 3684.62 E 5958397.66 N 615737.80 E 3,067 3358.57
6311.28 55.910 101.710 4539.69 4626.83 318.88 S 3762.26 E 5958382.40 N 615815.67 E 0.518 3434.27
6407.52 55,970 105.520 4593,60 4680.74 337.64 S 3839.72 E 5958364.80 N 615893.41 E 3.280 3510.97
6503.48 57.150 112.600 4646.53 4733.67 363.80 S 3915.32 E 5958339.77 N 615969.39 E 6.277 3589,67
6600.08 57.990 112.070 4698.33 4785.47 394.78 S 3990.74 E 5958309.92 N 616045.26 E 0.985 3670.58
6695.69 59.420 116.450 4748.01 4835.15 428.36 S 4065.18 E 5958277.46 N 616120.20 E 4.190 3751,92
6792.38 60.900 116.830 4796,12 4883.26 465.96 S 4140.15 E 5958240.97 N 616195.71 E 1.568 3835.70
6887.40 62.320 119.150 4841.30 4928.44 505.20 S 4213.95 E 5958202.84 N 616270.09 E 2.617 3919,25
6983.38 63,690 121.350 4884.87 4972.01 548.29 S 4287.81 E 5958160.86 N 616344.59 E 2.492 4004.76
7079.14 64.770 125.260 4926.52 5013.66 595.64 S 4359.86 E 5958114.59 N 616417.33 E 3.846 4090.77
7175.19 66.610 126.210 4966.06 5053.20 646.76 S 4430.90 E 5958064.53 N 616489.13 E 2.117 4177.76
7270.66 70.300 131.370 5001.13 5088.27 702.40 S 4500.04 E 5958009.93 N 616559.09 E 6.340 4265,31
7366.12 72.160 133.340 5031.85 5118.99 763.29 S 4566.82 E 5957950.04 N 616626.77 E 2.759 4353,38
r=-~ 7462.45 74.260 136.540 5059,68 5146.82 828.43 S 4632.08 E 5957885.88 N 616692.99 E 3.856 4442.21
7558.77 78.650 135.780 5082.23 5169.37 895.95 S 4696.93 E 5957819.33 N 616758.84 E 4.622 4531,85
7655.26 81.890 139.600 5098,55 5185.69 966.27 S 4760.91 E 5957749.98 N 616823.87 E 5,147 4622.12
7719.50 82.170 139.480 5107,45 5194.59 1014.67 S 4802.19 E 5957702.19 N 616865.87 E 0.473 4681.84
7807.93 82.780 138.950 5119.03 5206.17 1081.05 S 4859.46 E 5957636.67 N 616924,12 E 0.910 4764.32
7851.19 83.960 139.610 5124.03 5211.17 1113.62 S 4887.49 E 5957604.53 N 616952.63 E 3.120 4804.73
7903.48 86.120 138.270 5128,55 5215.69 1152.89 S 4921.71 E 5957565.77 N 616987.43 E 4.856 4853.82
7948.06 87.970 139.910 5130.85 5217.99 1186.54 S 4950.86 E 5957532.56 N 617017,08 E 5.542 4895.74
7997.81 88.340 142.080 5132.45 5219.59 1225.18 S 4982.16 E 5957494.39 N 617048.95 E 4.423 4941.97
8043.61 88,890 141.110 5133.56 5220.70 1261.06 S 5010.60 E 5957458.94 N 617077.92 E 2.434 4984,36
8093.17 91.170 143.200 5133.53 5220.67 1300.19 S 5041.00 E 5957420.27 N 617108.90 E 6.241 5030,06
8138.27 91.480 143.750 5132.49 5219.63 1336.42 5 5067.84 E 5957384.44 N 617136.28 E 1 .400 5071.22
-----~-
--. ----
8 July, 2002 - 15:55
Page 4 0'8
DrillQlIest 2.00.08.005
Sperry-S 1lI1Æ "<~~_elVices .
Survey Re~<fon < «<.If:
Your Ref: API~
Job No. AKMW22078, SurvitYed:4June, 2002
BPXA
North Slope Alaska PBU_WOA W Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azlm. Depth Depth Northing. Eastlngs Northing. Eastlngs Rate Section Comment
eft) eft) eft) (ft) (ft) (ft) (ft) (o/100ft)
<---... 8188,76 91.720 144.070 5131.08 5218.22 1377.20 S 5097.57 E 5957344.10 N 617166.61 E 0.792 5117.14
8235.71 90.610 143.820 5130.12 5217.26 1415.15 S 5125.19 E 5957306.57 N 617194.80 E 2.423 5159,84
8283,88 90.430 143.550 5129.69 5216.83 1453.97 S 5153.72 E 5957268.19 N 617223.90 E 0.674 5203,75
8331.02 89.880 146.190 5129.56 5216.70 1492.52 S 5180.84 E 5957230.05 N 617251.60 E 5,721 5246,30
8379.63 91.290 144.830 5129.06 5216.20 1532.58 S 5208.37 E 5957190.40 N 617279.71 E 4.030 5289,95
8425.79 91.660 145.530 5127.87 5215.01 1570.46 S 5234.71 E 5957152.92 N 617306.62 E 1.715 5331.50
8473,75 91.780 142.430 5126.43 5213.57 1609.23 S 5262.90 E 5957114.57 N 617335.39 E 6.466 5375.09
8520,20 92.280 145.690 5124.79 5211.93 1646.81 S 5290.14 E 5957077.40 N 617363.19 E 7.096 5417.27
8569.79 91.290 144.880 5123.24 5210.38 1687.55 S 5318.37 E 5957037.09 N 617392.02 E 2.579 5461.86
8615.83 91.290 144.830 5122,21 5209.35 1725.19 S 5344.87 E 5956999.85 N 617419.07 E 0.109 5503.42
8664.48 90.860 146.610 5121.29 5208.43 1765.38 S 5372.26 E 5956960.07 N 617447.06 E 3.763 5547.02
8709.49 90.860 145.460 5120,62 5207.76 1802.70 S 5397.41 E 5956923.12 N 617472.76 E 2.555 5587,25
8759,74 90.990 144.540 5119.81 5206.95 1843.86 S 5426.22 E 5956882.40 N 617502.19 E 1.849 5632.56
8812.87 90.800 145.500 5118.98 5206.12 1887.38 S 5456.68 E 5956839.33 N 617533.29 E 1.842 5680.46
8852.45 90.490 143.420 5118.53 5205.67 1919.59 S 5479.68 E 5956807.48 N 617556.77 E 5.313 5716,31
8901.16 90.000 144.860 5118.32 5205.46 1959.06 S 5508.22 E 5956768.43 N 617585.89 E 3.123 5760,55
8948.83 89.820 142.220 5118.40 5205.54 1997.40 S 5536.54 E 5956730.52 N 617614.78 E 5.551 5804.04
8995.61 89.020 145.480 5118.87 5206.01 2035.16 S 5564.13 E 5956693.17 N 617642.93 E 7.175 5846.62
...---~ 9045.02 89.140 144.680 5119.66 5206.80 2075.67 S 5592.41 E 5956653.09 N 617671.82 E 1.637 5891.14
9094.76 89.940 146.160 5120,06 5207.20 2116.62 S 5620.64 E 5956612.57 N 617700.65 E 3.382 5935,84
9140,27 91.600 145.270 5119.45 5206.59 2154.22 S 5646.27 E 5956575.35 N 617726.84 E 4.139 5976.63
9185.50 91.110 146.160 5118.38 5205.52 2191.58 S 5671.74 E 5956538.38 N 617752.87 E 2,246 6017.16
9235.54 92,270 145.670 5116.91 5204.05 2233.01 S 5699.78 E 5956497.38 N 617781.51 E 2.516 6061.91
9281.47 92.150 144.720 5115,14 5202.28 2270.69 S 5725.97 E 5956460.09 N 617808.27 E 2.083 6103.24
9330.61 92.340 143.420 5113.21 5200.35 2310.45 S 5754.78 E 5956420.76 N 617837.67 E 2.672 6147.86
9376.83 90.860 143.070 5111.92 5199.06 2347.46 S 5782.43 E 5956384.16 N 617865.86 E 3.290 6190.11
9426.91 90.740 144.010 5111.22 5198.36 2387.74 S 5812.19 E 5956344.34 N 617896.22 E 1.892 6235,81
9477.36 90.800 140.920 5110.54 5197.68 2427.74 S 5842.92 E 5956304.80 N 617927.54 E 6.125 6282,21
9521.10 89.570 140.590 5110.40 5197.54 2461.61 S 5870.59 E 5956271.34 N 617955.71 E 2.912 6322,95
9567.41 89.260 143.450 5110.87 5198.01 2498.11 5 5899.08 E 5956235.28 N 617984.75 E 6.212 6365.69
------~---,_.~-
8 July, 2002 - 15:55
Page 50f8
DrillQupst 2.00.08.005
Sperry-SuR Dti.. . t;>aervices .
SurveyRePêttffJít¡~ "~ilWD
Your Ref:APt "..,', .)110
Job No. AKMW22tJ78, S~{4June, 2002
BPXA
North Slope Alaska PBU_WOA W Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northing. Eastlng. Northing. Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 0 Oft)
/- 9614.97 89.940 141.080 5111.21 5198.35 2535.72 S 5928.19 E 5956198.10 N 618014.41 E 5.184 6409.51
9663.00 90.250 141,830 5111.13 5198.27 2573.28 S 5958.12 E 5956160.99 N 618044.90 E 1,690 6454.03
9711.46 90.490 141.700 5110.81 5197.95 2611.34 S 5988.11 E 5956123.38 N 618075.45 E 0.563 6498.84
9760.16 90.120 139.900 5110.56 5197.70 2649.08 S 6018.88 E 5956086.10 N 618106.79 E 3.773 6544,18
9805.85 90.680 138.860 5110.24 5197.38 2683.76 S 6048.63 E 5956051.87 N 618137.05 E 2.585 6587.12
9853.51 91.040 142.320 5109.52 5196.66 2720.57 S 6078.88 E 5956015.51 N 618167.84 E 7.298 6631.54
9901.46 89,820 141.810 5109.16 5196.30 2758.39 S 6108.36 E 5955978.14 N 618197.88 E 2.758 6675.79
9954.45 90.000 143.320 5109.24 5196.38 2800.47 S 6140.56 E 5955936.55 N 618230.71 E 2.870 6724.50
9998.74 90.120 142.590 5109.20 5196.34 2835.82 S 6167.25 E 5955901.60 N 618257.92 E 1.670 6765.10
10045.73 90.430 141.790 5108.97 5196.11 2872.94 S 6196.05 E 5955864.91 N 618287.27 E 1,826 6808.42
10095.14 90.490 141.440 5108.58 5195.72 2911.67 S 6226.73 E 5955826.64 N 618318.53 E 0.719 6854.16
10141.64 89.450 143.130 5108,60 5195.74 2948.45 S 6255.18 E 5955790.29 N 618347.52 E 4.267 6897.00
10189.97 89.630 145.870 5108.99 5196.13 2987.79 S 6283.24 E 5955751.37 N 618376.16 E 5.681 6940.76
10236.81 89.450 146.440 5109.36 5196.50 3026.69 S 6309.33 E 5955712.86 N 618402.83 E 1.276 6982.59
10285.14 90.000 146.120 5109,60 5196.74 3066.89 S 6336.15 E 5955673.07 N 618430.25 E 1.317 7025.69
10331.87 89.940 144.860 5109.62 5196.76 3105.40 S 6362.63 E 5955634.96 N 618457.30 E 2.699 7067.66
10379.68 89.570 147.080 5109.82 5196.96 3145.02 S 6389.38E 5955595.75 N 618484.64 E 4.707 7110.42
10424.55 89.820 147.570 5110.06 5197.20 3182.79 S 6413.61 E 5955558.34 N 618509.42 E 1,226 7150.06
10475.36 90.120 147.320 5110.09 5197.23 3225.61 S 6440.95 E 5955515.93 N 618537.40 E 0.769 7194.91
10519.84 89.380 146.030 5110.28 5197.42 3262.78 S 6465.38 E 5955479.13 N 618562.39 E 3.343 7234.44
10568.38 89.570 147.230 5110.73 5197.87 3303.31 S 6492.08 E 5955439.00 N 618589.69 E 2.503 7277.60
10615.13 89.570 145.170 5111.08 5198.22 3342.16 S 6518.09 E 5955400.55 N 618616.27 E 4.406 7319.32
10663.55 89.140 147.860 5111.63 5198.77 3382.53 S 6544.80 E 5955360.57 N 618643.58 E 5.626 7362.42
10711.33 89,260 147.790 5112.29 5199.43 3422.97 S 6570.24 E 5955320.52 N 618669.62 E 0.291 7404.43
10760.35 89.450 146.040 5112.84 5199.98 3464.04 S 6596.99 E 5955279.85 N 618696.98 E 3.591 7447.90
10805.67 89.450 145.770 5113.28 5200.42 3501.57 S 6622.40 E 5955242.71 N 618722.94 E 0.596 7488.46
10855.81 89.570 143.090 5113.71 5200.85 3542.35 S 6651.56E 5955202.37 N 618752.71 E 5.350 7533,88
10901.72 88.710 141.930 5114.40 5201.54 3578.77 S 6679.50 E 5955166.37 N 618781.19 E 3.145 7576,10
10951.18 88.710 140.550 5115.51 5202.65 3617.33 S 6710.45 E 5955128.27 N 618812.71 E 2.789 7622,00
10996.41 88.830 142.190 5116.48 5203.62 3652.65 S 6738.68 E 5955093.38 N 618841.47 E 3.635 7663,93
------~--_.~--_.-
B July, 2002 - 15:55
Page 60fS
DrillQuest 2.00.08.005
Sperry-Sun IJ/ - ,,-ê,".-,,$ervices
Survey Reportfo"~203AfWD
Your Ref: A'P/5«J2t2308700
Job No. AKMW2207B, SutVéyed:'4 June, 2002
.
BPXA
North Slope Alaska PBU_WOA W Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azlm. Depth Depth Northlngs Eastlnga Northing. Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
.- 11046.46 89.570 144,740 5117.18 5204.32 3692.86 S 6768.47 E 5955053.62 N 618871.85 E 5.305 7709.62
11094.80 87.790 140.750 5118.29 5205.43 3731.32 S 6797.72 E 5955015.60 N 618901.67 E 9.036 7753.98
11142.23 87.910 142.630 5120.07 5207.21 3768.50 S 6827.10 E 5954978.85 N 618931.60 E 3.969 7797.84
11189.22 87,600 140.400 5121.91 5209.05 3805.26 S 6856.32 E 5954942.54 N 618961.37 E 4.788 7841.33
11237.36 87.780 142.010 5123.86 5211.00 3842.74 S 6886.45 E 5954905.51 N 618992.06 E 3.363 7885.99
11250.84 87.720 140.790 5124.38 5211.52 3853.27 S 6894.86 E 5954895.11 N 619000.62 E 9.054 7898.48
11320.00 87,720 140.790 5127.14 5214,28 3906.82 S 6938.54 E 5954842.22 N 619045.10 E 0.000 7962.83 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 119.400° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 11320.000.,
The Bottom Hole Displacement is 7962.83ft., in the Direction of 119.382° (True).
"
._._----~--
----- -- ----- --
8 July, 2002 - 15:55
Page 7 of8
DrillQuest 2.00.08.005
.
North Slope Alaska
BPXA
PBU_WOA W Pad
Comments
----
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
11320.00
5214.28
3906.82 S
6938.54 E
Projected Survey
Survey tool program for W-203 MWD
From To
Measured Vertical Measured Vertical
Depth Depth Depth Depth Survey Tool Description
(ft) (ft) (ft) (ft)
0.00
0.00 11320,00
5214.28 MWD Magnetic
,-
.-- ~'----._-.._-------~
B July, 2002 - 15:55
Page B of8
DrillQuest 2.00.08.005
AOGCC
Attn: Lisa Weepie
333 W. 7th Avenue, Suite 100
Anchorage, Alaska 99501
Definitive
Re: Distribution of Survey Data for Well W-203
Dear Sir I Madam:
Enclosed are 2 survey hard copy(s) and 1 disk.
Tie-on Survey:
Window I Kickoff Survey
Projected Survey:
'MD
'MD
11,320.00 I MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
REceiVED
!I II 1 7 200,1)
v J:..., { {..
Alaska Oil & Gas Cons. CornmiaoiA
Anchorage U~fUn
a tB-oCJ¡
Ì"".
0-
))
3
~
)EF N T VE
~
North S/ope"i4/aska
BPXA
PBU_WOA WPsfI,Slot W-203
W-2ØI
Job No. AKZZ22078, Surveyed: 4 June, 2002
SURVEY IfEPORT
8 July, 2002
Your Ref: API 50082308700
Surface Coordinates: 5958645.16 N, 612049.08 E(70° 17' 45.4671" N, 149005' 33.6448" W)
Kelly Bushing: 87.1,1" above Mean Sea Level
/-
~.... .y_c,.,..,
DAILL.INI:s ~.hvlces
A Halliburton Company
Survey Ref: svy11191
Sperry-Sun Drillitfg Services .
Survey Reportl«W-203
Your Ref: API5l1Ø82308100
Job No. AKZZ22078, Surveyed: 4 June, 2002
BPXA
North Slope Alaska PBU_WOA W Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
0.00 0.000 0.000 -87.14 0.00 O.OON O.OOE 5958645.16 N 612049.08 E 0.00 AK-6 BP..IFR-AK
/- 104.00 0.000 0.000 16.86 104.00 O.OON O.OOE 5958645.16 N 612049.08 E 0.000 0,00
195.18 0.120 268.140 108.04 195.18 O.OON 0.10W 5958645.16 N 612048.98 E 0.132 -0,08
286,33 0.570 264.890 199.19 286.33 0.055 O.64W 5958645.10 N 612048.44 E 0.494 -0,54
376.18 0,570 237,070 289.03 376.17 0.335 1.46 W 5958644.81 N 612047.62 E 0.305 -1,11
463.89 0.450 193,140 376.74 463.88 0.908 1.91 W 5958644.23 N 612047.19 E 0.453 -1,22
554.49 1.190 117.960 467.33 554.47 1.695 1.16W 5958643.45 N 612047.95 E 1 .280 -0,18
645.89 3.110 110.970 558.66 645,80 3.025 2.00E 5958642.17 N 612051.12 E 2.116 3,22
734.92 5.650 110.320 647.43 734.57 5.41 5 8.36E 5958639.88 N 612057.52 E 2.853 9,94
831.52 7.860 110.050 743.35 830.49 9.328 19.03 E 5958636.12 N 612068.25 E 2.288 21,16
927.14 10,570 112.920 837.73 924.87 14.98 8 33.25 E 5958630.67 N 612082.55 E 2.874 36,32
1022.50 13.410 110.620 931.00 1018.14 22.28 5 51.66 E 5958623.65 N 612101.07 E 3.019 55.95
1115.56 15.210 110.880 1021.17 1108.31 30.44 8 73.17 E 5958615.82 N 612122.69 E 1.935 78.69
1211.36 17.360 109.190 1113.12 1200.26 39.61 5 98.41 E 5958607.02 N 612148.07 E 2.298 105,18
1306,53 19,000 108.550 1203.54 1290.68 49.21 8 126.51 E 5958591.84 N 612176.31 E 1.736 134,37
1402.10 22.340 104.740 1292.94 1380.08 58.788 158.83 E 5958588.15 N 612208.77 E 3.766 167,24
1497.98 24.960 102.120 1380.77 1467.91 67.678 196.24 E 5958580.42 N 612246.31 E 2.944 204,19
1593.55 26,860 100.480 1466.73 1553.87 75.83 8 231.19 E 5958512.81 N 612287.38 E 2.125 243,87
1690.12 29.820 96.620 1551.72 1638.86 82.57 5 282.51 E 5958566.81 N 612332.79 E 3.603 286,66
1785,59 31.660 95.940 1633.77 1720.91 87.908 331.01 E 5958562.20 N 612381.37 E 1.961 331.53
1881.38 33.930 94.060 1714.29 1801.43 92.40 S 382.69 E 5958558.48 N 612433.11 E 2.597 378,76
1977.39 39.380 91.730 1791.29 1878.43 95.21 8 439.91E 5958556.51 N 612490.36 E 5.858 430.00
2070.92 39.210 90.250 1863.68 1950.82 96.24 8 499.13 E 5958556.31 N 612549.59 E 1.018 482,09
2166.60 39,880 89.340 1937.46 2024.60 96.02 8 560.05 E 5958557.50 N 612610.49 E 0.926 535,05
2262.54 43.200 89.680 2009.26 2096.40 95.488 623.66 E 5958558.99 N 612674.09 E 3.468 590,21
2357.62 45.820 88.590 2077.06 2164.20 94.46 8 690.29 E 5958561.00 N 612140.71 E 2,870 647.76
2454.50 49.510 86.620 2142.29 2229.43 91.43 8 161.83 E 5958565.10 N 612812.19 E 4.094 708,60
2550.17 54,220 85,630 2201.36 2288.50 86.33 5 836.88 E 5958571.32 N 612887.16 E 4.990 771.48
2646.29 55,350 86,620 2256.78 2343.92 81.02 8 915.23 E 5958571.79 N 612965.41 E 1.446 837,13
2742,18 55.120 86,740 2311.46 2398.60 76.46 S 993.87 E 5958583.52 N 613043.98 E 0.261 903.41
---- ---------
8 July, 2002 - 15:37
Page 20f8
DrmQllcst 2.00.08.005
Sperry-Sun Qril/iflfl,Services .
Survey RèþO . -.203
Your Ref: AÞJ -moo
Job No. AKZZ22078, '. S : 4 June, 2002
BPXA
North Slope Alaska PBU_WOA W Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Inct. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
"-. 2837.97 54.440 85.480 2366.71 2453.85 71.16 8 1071.94 E 5958589.99 N 613121.96 E 1.288 968.82
2933.43 54.680 86.510 2422.06 2509.20 65.73 8 1149.52E 5958596.58 N 613199.46 E 0.914 1033,75
3028.35 54.440 89.190 2477.11 2564.25 62.82 8 1226.79 E 5958600.63 N 613276.67 E 2.314 1099,64
3125.50 54.060 88.260 2533.87 2621.01 61.07 8 1305.61 E 5958603.56 N 613355.46 E 0.870 1167.45
3221.80 53.770 89,140 2590.59 2677.73 59.30 8 1383.42 E 5958606.49 N 613433.23 E 0.798 1234,36
3317.42 52.920 92.550 2647.68 2734.82 60.42 8 1460.10 E 5958606.51 N 613509.92 E 2.996 1301,72
3412,26 52.140 95.590 2705.38 2792.52 65.758 1535.17 E 5958602.30 N 613585.06 E 2.674 1369,74
3505.85 51.630 95.140 2763.15 2850.29 72.64 8 1608.48 E 5958596.51 N 613658.46 E 0,663 1436,99
3603.22 51.250 95,350 2823.85 2910.99 79.60 8 1684.30 E 5958590.68 N 613734.38 E 0.425 1506.46
3697.95 51.260 94.780 2883.13 2970.27 86.12 8 1757.89 E 5958585.26 N 613808.06 E 0.469 1573,78
3794.11 50.370 97.060 2943.89 3031.03 93.80 8 1832.02 E 5958578.68 N 613882.29 E 2.058 1642,13
3890.02 50.300 96.680 3005.11 3092.25 102.638 1905.32 E 5958570.95 N 613955.72 E 0,314 1710.32
3985.64 50.220 96.620 3066.24 3153.38 111.148 1978.35 E 5958563.52 N 614028.87 E 0.097 1778.13
4109.12 50,070 98.230 3145.38 3232.52 123.39 8 2072.34 E 5958552.68 N 614123.03 E 1.008 1866,03
4204.73 50.480 95.690 3206.49 3293.63 132.30 8 2145.33 E 5958544.86 N 614196.14 E 2.088 1933,98
4301.61 50.510 96.740 3268.12 3355.26 140.398 2219.64 E 5958537.88 N 614270.56 E 0.837 2002,69
4396.79 50.540 97.380 3328.63 3415.77 149.428 2292.55 E 5958529.94 N 614343.60 E 0.520 2070,65
4492.56 49,730 92,790 3390.04 3477.18 155.958 2365.73 E 5958524.50 N 614416.87 E 3.774 2137,61
4585.56 49.670 94.420 3450.19 3537.33 160.41 8 2436.51 E 5958521.09 N 614487.71 E 1.338 2201.4 7
4684.56 49.520 94.260 3514.36 3601.50 166.11 8 2511.68 E 5958516.51 N 614562.96 E 0.195 2269,76
4779.44 49.570 92.230 3575.93 3663.07 170.20 8 2583.76 E 5958513.50 N 614635.09 E 1.629 2334.55
4875.42 49.400 92.670 3638.28 3725.42 173.32 8 2656.66 E 5958511.47 N 614708.03 E 0,391 2399,60
4969,82 49.090 94.200 3699.91 3787.05 177.608 2728.03 E 5958508.25 N 614779.46 E 1,271 2463,88
5067.35 48.890 92.880 3763.91 3851.05 182.148 2801.49 E 5958504.80 N 614852,97 E 1.042 2530,11
5163.45 49.780 95.140 3826.53 3913.67 187.258 2874.19 E 5958500.78 N 614925.74 E 2.010 2595,96
5258.72 49,930 93.950 3887.96 3975.10 193.028 2946.79 E 5958496.09 N 614998.42 E 0.968 2662,04
5352.92 49.930 94.880 3948.60 4035.74 198.57 8 3018.66 E 5958491.62 N 615070.36 E 0.756 2727,38
5449.82 49.720 95.080 4011.11 4098.25 205.00 8 3092.42 E 5958486.29 N 615144.21 E 0.268 2794.79
5544.68 51,030 96.370 4071.61 4158.75 212.29 8 3165.11 E 5958480.08 N 615217.01 E 1.733 2861.70
5642.03 50.430 96,170 4133,23 4220.37 220.52 S 3240.03 E 5958472.96 N 615292,03 E 0.637 2931,01
~----- ------
8 July, 2002 - 15:37
Page 30f8
Drí1lQllest 2.00.08.005
Sperry-Sun DriUing Services .
Survey Reportfòr W.203
Your Ref: API 500292308700
Job No. AKZZ22078, SUNeyed: 4 June, 2002
BPXA
North Slope Alaska PBU_WOA W Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
5737.70 50.040 95.550 4194.42 4281.56 228.03 S 3313.18 E 5958466.55 N 615365.29 E 0.644 2998.43
5832.90 51,000 97.250 4254.95 4342.09 236.23 S 3386.20 E 5958459.44 N 615438.42 E 1.708 3066.07
',-~ 5927.67 50,680 97.880 4314.80 4401.94 245.90 S 3459.04 E 5958450.85 N 615511.40 E 0.616 3134.28
6023,90 53.190 98,210 4374.13 4461.27 256.51 S 3534.05 E 5958441.36 N 615586.56 E 2.622 3204,83
6118,23 54.330 99.080 4429.89 4517.03 267.95 S 3609.26 E 5958431.05 N 615661.94 E 1.419 3275.98
6215.27 55.580 102,750 4485.63 4572,77 283.01 S 3687.25 E 5958417.15 N 615740.14 E 3.353 3351.31
6311.28 55.910 103.120 4539.67 4626.81 300.77 S 3764.59 E 5958400.55 N 615817.73 E 0.469 3427.41
6407.52 55.970 105.730 4593.57 4680.71 320.63 S 3841.79 E 5958381.84 N 615895.23 E 2.248 3504.42
6503.48 57,150 110.070 4646.4 7 4733.61 345.25 S 3917.96 E 5958358.36 N 615971.75 E 3.969 3582,86
6600.08 57,990 111.890 4698.28 4785.42 374.45 S 3994.08 E 5958330.30 N 616048.30 E 1.812 3663.51
6695.69 59.420 114.680 4747.95 4835,09 406.75 S 4069.10 E 5958299.11 N 616123.79 E 2.908 3744.74
6792.38 60.900 116.720 4796.06 4883.20 443.13 S 4144.66 E 5958263.87 N 616199.89 E 2.386 3828.42
6887.40 62,320 119.020 4841.24 4928.38 482.21 S 4218.55 E 5958225.89 N 616274.35 E 2.601 3911.98
6983.38 63,690 121.880 4884.82 4971.96 525.56 S 4292.25 E 5958183.65 N 616348.69 E 3.014 3997.47
7079.14 64,770 125,070 4926.46 5013.60 573.12 S 4364.17 E 5958137.16 N 616421.30 E 3.205 4083.47
7175.19 66.610 128.140 4966.00 5053.14 625.32 S 4434.41 E 5958086.02 N 616492.32 E 3.486 4170.29
7270.66 70,300 131.980 5001.07 5088.21 682.48 S 4502.32 E 5958029.88 N 616561.08 E 5.378 4257.52
7366.12 72,160 133.690 5031.79 5118.93 743.93 S 4568.59 E 5957969.42 N 616628.25 E 2.583 4345.42
7462.45 74,260 136.950 5059.62 5146.76 809.50 S 4633.41 E 5957904.83 N 616694.05 E 3.905 4434,08
7558.77 78,650 137.770 5082.17 5169,31 878.37 S 4696.82 E 5957836.91 N 616758.48 E 4.632 4523.13
7655.26 81,890 139.680 5098.48 5185.62 949.84 S 4759.54 E 5957766.38 N 616822.25 E 3,883 4612,86
7719.50 82,170 139.640 5107,39 5194,53 998.33 S 4800.73 E 5957718.51 N 616864.15 E 0.440 4672.54
7807.93 82,780 138.930 5118.97 5206.11 1064.78 S 4857.91 E 5957652.92 N 616922.32 E 1.053 4754.98
7851.19 83,960 138.590 5123,96 5211.10 1097.09 S 4886.24 E 5957621.04 N 616951.13 E 2.837 4795.52
7903.48 86,120 139.010 5128.48 5215.62 1136.28 S 4920.55 E 5957582.36 N 616986.02 E 4.208 4844,66
7948.06 87,970 139.900 5130,78 5217.92 1170.11 S 4949.49 E 5957548.97 N 617015.46 E 4.604 4886.47
7997.81 88,340 140.790 5132,38 5219.52 1208.39 S 4981.22 E 5957511.16 N 617047.76 E 1.937 4932.91
8043.61 88,890 141.290 5133.49 5220.63 1244.00 S 5010.01 E 5957475.99 N 617077.08 E 1.623 4975.47
8093.17 91,170 142.780 5133.46 5220,60 1283.07 S 5040.49 E 5957437.38 N 617108.14 E 5.496 5021.21
8138.27 91.480 142.530 5132.42 5219.56 1318.91 S 5067.85 E 5957401.95 N 617136.02 E 0,883 5062,63
-------~
8 July, 2002. 15:37
Page 4 of8
DrillQuest 2.00.08.005
Sperry-Sun DI1"..- Services .
Survey Report°~IfN.:f03
Your Ref: AÞI-5tJðIII30B700
Job No. AKZZ22078, SUNØýed: 4 June, 2002
BPXA
North Slope Alaska PBU _WOA W Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastings Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
8188.76 91.720 142,550 5131,01 5218.15 1358.97 S 5098.54 E 5957362.35 N 617167.31 E 0.477 5109.04
8235.71 90.610 143,010 5130,06 5217.20 1396.35 S 5126.93 E 5957325.40 N 617196.26 E 2.559 5152.13
I-='~-;--F" 8283,88 90.430 142.490 5129,62 5216.76 1434.695 5156.09 E 5957287.49 N 617225.99 E 1.142 5196.35
8331.02 89.880 142,610 5129.49 5216.63 1472.125 5184.75 E 5957250.50 N 617255.20 E 1.194 5239.70
8379.63 91.290 143.520 5128.99 5216.13 1510.97 S 5213.96 E 5957212.09 N 617284.99 E 3.452 5284.22
8425.79 91,660 143.910 5127.81 5214.95 1548.16 S 5241.27 E 5957175.30 N 617312,85 E 1.164 5326.27
8473.75 91 .780 142,890 5126.37 5213.51 1586.655 5269.85 E 5957137.25 N 617342,00 E 2.140 5370,06
8520.20 92.280 143.780 5124.72 5211.86 1623.895 5297.57 E 5957100.43 N 617370,27 E 2.197 5412.49
8569,79 91.290 144.000 5123.18 5210.32 1663.93 5 5326.78 E 5957060.83 N 617400.08 E 2.045 5457.59
8615.83 91,290 143,570 5122,14 5209.28 1701.06 S 5353.98 E 5957024.10 N 617427,82 E 0.934 5499.52
8664.48 90.860 143.840 5121.23 5208.37 1740.27 S 5382.77 E 5956985.33 N 617457.19 E 1.044 5543.85
8709.49 90.860 143.410 5120.55 5207.69 1776.50 S 5409.46 E 5956949.50 N 617484.42 E 0.955 5584.89
8759,74 90.990 143.320 5119.74 5206.88 1816.82 S 5439.44 E 5956909.63 N 617515.00 E 0.315 5630.80
8812,87 90,800 143.070 5118.91 5206.05 1859.36 S 5471.27 E 5956867.58 N 617547.46 E 0.591 5679.41
8852.45 90.490 142.660 5118.46 5205.60 1890.91 5 5495.16 E 5956836.38 N 617571.82 E 1.299 5715.71
8901.16 90,000 142.370 5118.26 5205.40 1929.56 S 5524.80 E 5956798.18 N 617602.03 E 1.169 5760.51
8948,83 89.820 141.830 5118.33 5205.47 1967.18 S 5554.08 E 5956761.00 N 617631.87 E 1.194 5804.49
8995.61 89.020 143.340 5118.81 5205.95 2004.33 S 5582.50 E 5956724.28 N 617660.84 E 3.653 5847.49
9045.02 89.140 142.960 5119.60 5206.74 2043.86 5 5612.13 E 5956685.19 N 617691.06 E 0.806 5892.71
9094.76 89,940 144.250 5120.00 5207.14 2083.90 S 5641.64 E 5956645.60 N 617721.16 E 3.052 5938.07
9140.27 91.600 144.740 5119.39 5206.53 2120.94 S 5668.07 E 5956608.96 N 617748.14 E 3.803 5979.28
9185,50 91.110 144,600 5118.32 5205.46 2157.83 S 5694.22 E 5956572.46 N 617774.84 E 1.127 6020.17
9235.54 92,270 144.990 5116.84 5203.98 2198.70 S 5723.06 E 5956532.03 N 617804.28 E 2.446 6065.35
9281.47 92,150 144.860 5115,07 5202.21 2236.26 S 5749.43 E 5956494.86 N 617831.21 E 0.385 6106,77
9330.61 92,340 144.150 5113.14 5200.28 2276.24 S 5777.94 E 5956455.31 N 617860.31 E 1.495 6151.23
9376,83 90.860 143.930 5111.85 5198,99 2313.63 S 5805.07 E 5956418.33 N 617888.00 E 3.237 6193.23
9426.91 90,740 143.540 5111.16 5198,30 2354.01 5 5834.69 E 5956378.40 N 617918.22 E 0.815 6238.85
9477 .36 90,800 143.570 5110.48 5197.62 2394.59 5 5864.66 E 5956338.27 N 617948.78 E 0.133 6284,88
9521.10 89.570 143.090 5110.34 5197.48 2429.67 5 5890.78 E 5956303.58 N 617975.43 E 3.019 6324,86
9567.41 89,260 143,850 5110.81 5197.95 2466.88 5 5918.34 E 5956266.79 N 618003.54 E 1.772 6367,14
- -~---
8 July, 2002. 15:37
Page 5 0'8
DrillQllest 2.00.08.005
Sperry-Sun DrilDf1 Services .
Survey Reporltttt/fW.203
Your Ref: API.8J3tf8100
Job No. AKZZ22078, SurVêýed:4 June, 2002
BPXA
North Slope Alaska PBU _WOA W Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Inel. Azlm. Depth Depth Northing. Eastlng. Northlngs Ea.tlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
9614.97 89,940 144.270 5111.14 5198,28 2505.38 S 5946.26 E 5956228.70 N 618032.03 E 1.680 6410.36
9663.00 90.250 143.400 5111.06 5198.20 2544.16 S 5974.60 E 5956190.35 N 618060.94 E 1.923 6454.09
t-...~- 9711,46 90.490 143.720 5110,75 5197.89 2583.14 S 6003.38 E 5956151.80 N 618090.31 E 0.825 6498.30
9760.16 90.120 142,840 5110.49 5197.63 2622.18 S 6032.50 E 5956113.21 N 618120.00 E 1.960 6542.83
9805.85 90.680 142.600 5110.17 5197.31 2658.53 S 6060.17 E 5956077.27 N 618148.21 E 1.333 6584,79
9853.51 91.040 142.320 5109.45 5196.59 2696.32 S 6089.21 E 5956039.92 N 618177.81 E 0.957 6628.64
9901.46 89.820 143.280 5109.09 5196,23 2734.51 S 6118.20 E 5956002.16 N 618207.37 E 3.238 6672,64
9954.45 90,000 143.240 5109.18 5196.32 2776.97 S 6149.90 E 5955960.18 N 618239.69 E 0.348 6721.10
9998.74 90.120 143.290 5109.13 5196,27 2812.47 S 6176.39 E 5955925.08 N 618266.71 E 0.294 6761.61
10045,73 90.430 142.940 5108.91 5196.05 2850.05 S 6204.59 E 5955887.92 N 618295.47 E 0.995 6804.63
10095,14 90.490 142.510 5108.51 5195.65 2889.37 S 6234.51 E 5955849.06 N 618325.98 E 0.879 6850.00
10141,64 89.450 142.730 5108.53 5195.67 2926.32 S 6262.74 E 5955812.53 N 618354.75 E 2.286 6892.73
10189,97 89.630 141.650 5108.92 5196.06 2964.50 S 6292.37 E 5955774.80 N 618384.95 E 2.265 6937.28
10236.81 89.450 143.830 5109.30 5196.44 3001.78 S 6320.73 E 5955737.95 N 618413.86 E 4.670 6980.29
10285.14 90.000 145.080 5109,53 5196.67 3041.10 S 6348.82 E 5955699.05 N 618442.53 E 2.826 7024.07
10331,87 89.940 145.130 5109.55 5196.69 3079.43 S 6375.56 E 5955661.12 N 618469.84 E 0.167 7066.17
10379.68 89.570 145.830 5109.76 5196.90 3118.82 S 6402.65 E 5955622.14 N 618497.51 E 1.656 7109.12
10424.55 89.820 146.000 5110.00 5197.14 3155.98 S 6427.79 E 5955585.36 N 618523.21 E 0.674 7149.27
10475,36 90,120 145,640 5110.02 5197.16 3198.01 S 6456.34 E 5955543.75 N 618552.38 E 0.922 7194.77
10519.84 89.380 145,820 5110.22 5197.36 3234.77 S 6481.39 E 5955507.37 N 618577.97 E 1.712 7234.63
10568.38 89.570 145,350 5110.66 5197,80 3274.81 S 6508.82 E 5955467.75 N 618606.00 E 1,044 7278.19
10615.13 89,570 144.880 5111.01 5198,15 3313.16 S 6535.55 E 5955429.80 N 618633.30 E 1.005 7320.31
10663.55 89.140 144.570 5111.56 5198,70 3352.69 S 6563.52 E 5955390.69 N 618661.85 E 1,095 7364.07
10711,33 89.260 144.670 5112.23 5199,37 3391.64 S 6591.18 E 5955352.16 N 618690.09 E 0.327 7407.29
10760.35 89.450 144,130 5112.78 5199.92 3431.50 S 6619.71 E 5955312.73 N 618719.21 E 1.168 7451.72
10805,67 89.450 143.450 5113.21 5200.35 3468.06 S 6646.48 E 5955276.57 N 618746.53 E 1.500 7492.99
10855.81 89.570 143.040 5113.64 5200.78 3508.23 S 6676.48 E 5955236.85 N 618777.12 E 0.852 7538.85
10901.72 88.71 0 142.620 5114.33 5201.47 3544.81 S 6704.22 E 5955200.69 N 618805.40 E 2,085 7580.97
10951 ,18 88.710 141.840 5115.44 5202.58 3583.90 S 6734.51 E 5955162.06 N 618836.27 E 1.577 7626.54
10996.41 88,830 141.780 5116.42 5203.56 3619.44 S 6762.46 E 5955126.94 N 618864.75 E 0.297 7668,35
------- ._-~_..--
----- ----
8 July, 2002 - 15:37
Page 60f8
DrillQuest 2.00.08.005
Sperry-Sun DrilagServices
Survey Report forW.203
Your Ref: API 500212308700
Job No. AKZZ22078, Surveyed: 4 June, 2002
.
BPXA
North Slope Alaska PBU_WOA W Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azlm. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) CO/100ft)
11046.46 89.570 141.540 5117.11 5204.25 3658.69 S 6793.51 E 5955088.16 N 618896.38 E 1.554 7714.66
11094.80 87,790 141.310 5118.23 5205.37 3696.47 S 6823.64 E 5955050.83 N 618927.07 E 3.713 7759.46
I:---::~ 11142.23 87.910 140.960 5120.01 5207.15 3733.37 S 6853.38 E 5955014.37 N 618957.36 E 0.780 7803.49
11189,22 87.600 140.630 5121.85 5208.99 3769.76 S 6883.06 E 5954978.43 N 618987.57 E 0.963 7847.21
11237.36 87.780 140.160 5123.79 5210.93 3806.82 S 6913.72 E 5954941.84 N 619018.79 E 1.045 7892.11
11250.84 87.720 140.200 5124.32 5211.46 3817.16 S 6922.35 E 5954931.62 N 619027.57 E 0.535 7904.71
11320.00 87.720 140.200 5127.07 5214.21 3870.26 S 6966.58 E 5954879.19 N 619072.59 E 0.000 7969,31 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 119.4000 (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 11320.00ft.,
The Bottom Hole Displacement is 7969.45ft., in the Direction of 119.0540 (True).
- -----~-
8 July, 2002 - 15:37
Page 7o'B
DrillQuest 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for W-203
Your Ref: API 500292308700
Job No. AKZZ22078, SUlVeyed: 4 June, 2002
.
North Slope Alaska
BPXA
PBU_WOA W Pad
Comments
t_~
Measured
Depth
(ft)
Station Coordinates
lVD Northings Eastings
(ft) (ft) (ft)
Comment
11320.00
5214.21
3870,26 S
6966.58 E
Projected Survey
Survey tool program for W-203
From To
Measured Vertical Measured Vertical
Depth Depth Depth Depth Survey Tool Description
(ft) (ft) (ft) (ft)
0.00
0.00 11320.00
5214.21 AK-6 BP _IFR-AK
- ._~-.--.---~-
_._~~_._~---~-
8 July, 2002 - 15:37
Page B afB
DrillQuest 2.00.08.005
{
f
(~IF fÃ\ y rE . n ¡ ír I~\ n fÆ\ @l'i rM
@lJlfu( ~ WJû LAJl1~~~tAJ
A.I1A.~1iA. OIL AND GAS
CONSERVAnONCO~SSION
!
f
I
I
/
¡
/
/
¡
I
l
/
TONY KNOWLES, GOVERNOR
333 W. ]"'I AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Lowell Crane
Senior Drilling Engineer
BP Exploration (Alaska), Inc
PO Box 196612
Anchorage AK 99519
Re:
Prudhoe Bay Unit W -203
BP Exploration (Alaska), Inc
Pennit No: 202-097
Sur Loc: 3668' NSL, 1197' WEL, Sec. 21, TIIN, R12E, UM
Btmhole Loc. 5017' NSL, 4795, WEL, Sec. 26, TIIN, RI2E, UM
Dear Mr. Crane:
Enclosed is the approved application for pennit to drill the above referenced well.
The pennit to drill does not exempt you from obtaining additional pennits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required pennitting detenninations are made.
Annular disposal has not been requested as part of the Pennit to Drill application for Prudhoe
Bay Unit W-203.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Sincerely,
l{f~v~'¥
~~~~-&echsli Taylor
Chair
BY ORDER ~.~ THE COMMISSION
DATED this* day of May, 2002
jj c/Enclosures
.'
cc:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
~~A- 5/z(ê)'"'-
Hole
4811
12-1/411
8-3/411
6-1/811
,.'C STATE OF ALASKA "
ALASKA oil ,",ND GAS CONSERVATION COMMIS~, ,)N
PERMIT TO DRILL
20 MC 25.005
1 b. Type of well 0 Exploratory 0 Stratigraphic Test III Development Oil
0 Service 0 Development Gas 0 Single Zone III Multiple Zone
5. Datum Elevation (DF or KB) 10. Field and Pool
Plan KBE = 86.90' Prudhoe Bay Field / Polaris
6. ProRerty Designation Pool (Undefined)
g~'I-~ADL 028264 ~
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
W-203 I
9. Approximate spud date
05/19/02 J Amount $200,000.00
14. Number of acres in property 15. Proposed depth (MD and TVD)
2560 11330' MD / 5192' TVD
0 17. Anticipated pressure {s,e 20 AAC 25.035 (e) (2)}
90 Maximum surface 1694 psig, At total depth (TVD) 5100' / 2281 psig
Setting Depth
Top Bottom
MD TVD MD TVD
34' 34' 114' 114'
34' 34' 3996' 3197'
34' 34' 7750' 5203'
7650' 5192' 11330' 5192'
(Multilateral)
1 a. Type of work III Drill 0 Redrill
0 Re-Entry 0 Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
3668' NSL, 1197' WEL, SEC. 21, T11N, R12E, UM
At top of productive interval
2456' NSL, 1536' WEL, SEC. 22, T11 N, R12E, UM
At total depth
5017' NSL, 4795' WEL, SEC. 26, T11 N, R12E, UM
12. Distance to nearest property line 13. Distance to nearest well /
ADL 047451,262' MD No Close Approach
16. To be completed fg~ deviated wells
Kick Off Depth ;o-"'49CfMDP Maximum Hole Angle
18. Casinp Program Specifications
Size
Casina Weiaht Grade Couplina
2011 x 3411 215.5# A53 Weld
9-5/811 40# L-80 BTC
711 26# L-80 BTC-M
4-1/211 12.6# L-80 IBT
11. Type Bond (See 20 AAC 25.025)
(OBd)
Number 2S100302630-277
Lenath
80'
3958'
7716'
3677'
Quantitv of Cement
(include staae data)
260 sx Arctic Set (Approx.)
630 sx PF 'L', 274 sx Class 'G'
356 sx Class 'D-600G' Latex
Uncemented Slotted Liner ,./
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
feet
feet
feet
feet
Junk (measured)
Plugs (measured)
Casing
Structu ral
Conductor
Surface
Intermediate
Production
Liner
Length
Size
Cemented
MD
TVD
RE(~EIVED
true vertical
APR 3 0 2002
Alaska Oil & Gas Cons. Commission
Anchorage
Perforation depth: measured
20. Attachments
III Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch III Drilling Program
III Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Michael Triolo, 564-5774 Prepared By Name/Number: Terrie Hubble, 564-4628
correct to the best of my knowledge
Title Senior Drilling Engineer
Permit Number API Num~er 2 '"?' Q....,
/02--09/ 50-t)2-~"~' 50rj{--O()
Conditions of Approval: Samples Required 0 Yes 181 No
Hydrogen Sulfide Measures 0 Yes J2šI No
Required Working Pressure for BOPE 0 2K 0 3K
Other:
A~oval Date See cover letter
J \ l e ., ~ d-- for other reauirements
Mud Log Requirec 0 Yes ~ No
Directional Survey Required IS Yes 0 No
D4K D5K D10K 0 15K ~.5KPSif~
Approved By Onginal Signed By
Form 10-401 Rev. 12-01-85 CannilY Oðc.h!1i Toylo:
by order of
ctfRttJ I Nt~ tmis~on
Date ~ (e Dr
Submit In -riplicate
05/06~2002 14:27 FAX 907 564 4040
bp EXPLORATION
~I O(),2
t
(
Greater Prudhoe B~~ ',Iarls W-20~ .I~JI':-_~en p-~~~.",
1. Well Plan Summary
1:!I.~~Ij,;.' N" ~ 11'1~' "'I' j~""t""- ~gl&!.':i!:Uit~I'~'7l~- I "ii:~' ì'JiI~~' ~ ~t:itf1W~m~'W-z'~$'~
(:V¥III:: ,< ," , . ',' \.,¡f.;~, 1 ',~.'!~&J ;,' ~ ,~<~:~. .,. ,~:;, ~~ '~i~t ';~ïV;V:~~~:U~ '~""-,i~,~':;~ ;i~
",""~o""'''''''I''''~'~' -~IJ" (.," ~'" 1-,: ,-., IJ'<:',~,_,", It" 1-~j','''r.I.,,!1 ,~._I..", '~"JI'....' .~:.'¡"'.J-, ,"".".1 .~, ::'.J..
I Type of Well ~roducer or inlector):
I Producer (Multilateral) I
'Surface Location: 3,668' FSL, 1,19T FEL, Sec. 21. T11N, R12E
X ;; 612 049.02 Y = 5 958,645.07
;.''''.. 'L~I."II.l. -" I.LlI'I~-- L'~I"'''_V'I.~. 'J"ol1'oI..II' .j-, "'-,',)... HJ:",.¡l'L'n'..)I:.~-.II. .ro1J" '. '".-.(LO/"II_"':,1.IJI_,...,,'tr;.r'I. ".";j,W. L .-:"'"L",lLo'.-.- :...~.. '.to.
W-203 OBd Target Start: . 2,456' FSL, 1,536' FEL, Sec. 22, T11N, R12E
X = 617,009.00 Y = 5,957,509.00 Z = 5,125' TVDss
W-203 OBd Target End: 5,017' FSL, 4,795' FEL, Sec, 26. T11N, R12E
X = 619,076.00 Y = 5,954,823.00 Z = 5,105' TVDss , .
I, -:"r -I fiLl" -, I.U.."'llIPr-r-:I:~ II :1"J'r-,.lol.j'Ln ...",'u''''r-Lllr.. ',",,'IJ':' .-..1-1' I'"'I;I\I~.'!:'" 01.:.:..;.....,.., .:1.';.Lr......I_I.I)~ .'''':1 ...~. ;.¡"..I."-"'lloa"I,.I'ILI. ¡,1Io:7r.t...,J,'II, "1.'.;",..;.,.tr""I, ~.. 'a.' :~1l.....,I_:' 'LI:.:tJ~:z~~~.
W-203 L 1 OBc Target Start: 2,456' FSL. 1,536' FEL, Sec. 22, T11 N. R 12E
X;;; 617,009.00 Y = 5,957,509.00 Z = 5,060' TVDss
W-203 L 1 OBc Target End: 5,017' FSL, 41795' FEL, Sec. 26, T11 N, R12E
X = 619,076.00 Y;; 5 954,823.00 Z = 5,055' TVDss
.~~~~t~hfiñtio:i~~':m..:~j~~}.'Dt.1~lKlH:U~:tm~~~I.;.;~a¡ul,U!m':"~~~.~1U~~,~jÞ.~:~~!~~J~~tr~~t;~t:n;t.llii~~'~ñr;~;tHtfm~~tIiI~H~.!t::n1~"~mHfm~':';~a:r::'!lii~~U~m'r¡:I~.þ",~~~':'~.r;'Ì';;I~:~:\:\~!fr.~~H~:tt~;;,~.":t"'I.s;f1~n~.ilifu~t~\~?~i~~1~t!\...
W-203 L 1 Oba Target Start: 2,456' FSL. 1,536' FEL, Sec. 22, T11 N, R12E
X = 617,009.00 Y = 5,957,509.00 Z = 4,985' TVDss
W"-203 L1 Ùba Target Erid:""S",U17'FSL, 4,795' FEL, Séù.26,T11N,'R1'2E'
~ = 619,076.00 Y = 5,954~B23.00 Z = 4,980' TVDss
---..
fAFE Number:
15M1056
I Rig: I Doyon 14
:~,:',,'.,,", ,,,^,:,,,,,,J
l Estimate.d Start Date: I May 19111 2002 I I Operating' däys to complete: I 40. ~',~',,:':~:","""....-.' ",,":',]
OBa MD 11 ,31~' Oba TVDrkb: TD 5,067 OBa Max Inc. 92° I KB~. :¡.~:~.,~:~'?~'.]
OBc MD 11,324' OBc TVDrkb: TD. 5,142 OBc Max Inc. 910
OBd MD 11,330' Obd TVDrkb: TD 5,192 OBd Max Inc. 90°
Well Design:
USH grassroots multi-lateral with extended horizontal laterals. 4-"Y2" GËišlift ¡Jet"'"
, Pump completion.
Scope of Work,: MIRU:
. RU and NU Diverter, function test, PU 5" DP
Surface Hole (5" DP):
. Drill 12-1/4" Surface hole to:f: 3,996' MD just below the SV1 sand
. Run and cement 9-5/8" casing to su rface. l \ " ~ ~ A L::> ~ ~~, \- '\0 s"S (J) Ð ~ \
Intermediate Hole (5" DP): \",\ v \I_~v 'I ~ ~~ 1 .;>\
. Test casing to 3,000 psi. Drill out. Conduct FIT: 11.6 ppg EMW.
. Drill 8 %" into hole to::!: 7,750' MD. Land int. hole in OEd reservoir @ :.tH4".
. Run and cement 7" casing. Run USIT
Production Hole Lat #1 (3-%" DP):
\.. . Test casing to 3.000 psi. Drill out. Conduct FH: 12 ppg EMW
'- . Drill out shoe and drill a 6~1/8". 3,577' horizontal lateral in OBd.
. Run 4 Y2" slotted liner with hanger and liner top packer.
Production Hole Lat #2 (3"112" DP):
d~-Ö <1'6 . Run whipstock to top of OBc interval at::t 7,343' MD. Mill window in 7'1' casing.
V\..J . Drill a 6-1/8",3,983' horizontal well in the OBc. Pull Whipstock.
. Run 4 Y2" slotted liner with Baker Hook Hanger.
Production Hole Lat #3 (3- Ya" DP):
.....~ ""'-C"'C.r' . Run whipstock to top of aBa interval at:!: 7,093' MD. Mill window in T' casing.
d\....J:7 -., . Drill a 6-1/8",4,222' horizontal well in the 08a. Pull Whipstock.
. Run 4 V2" slotted liner with Baker Hook Hanger.
Completion:
. Complete well with a 4-¥2" tubing Gas Lift J Jet Pump compl~IVI::D
2
MAY 0 6 ZOO/
Alaska Oil & Gas Cona. Commi88ion
Anchorage
. .
(
1. Well Plan Summary
Greater Prudhoe Bay Polaris W-203 Permit
(
Well Name: W-203 & W-203L 1 & W-203L2
I Type of Well (producer or injector):
Surface Location:
W-203 OBd Target Start:
W-203 OBd Target End:
W-203 L 1 OBc Target Start:
W-203 L 1 OBc Target End:
W-203 L 1 Oba Target Start:
W-203 L 1 Oba Target End:
I AFE Number:
15M1056
I Producer (Multilateral) I
3,6681 FSL, 1,197' FEL, Sec. 21, T11 N, R12E
X = 612,049.02 Y = 5,958,645.07
2,4561 FSL, 1,5361 FEL, Sec. 22, T11 N, R12E
X = 617,009.00 Y = 5,957,509.00 Z = 5,125' TVDss
5,0171 FSL, 4,7951 FEL, Sec. 26, T11N, R12E
X = 619,076.00 Y = 5,954,823.00 Z = 5,105' TVDss
2,4561 FSL, 1,5361 FEL, Sec. 22, T11 N, R12E
X = 617,009.00 Y = 5,957,509.00 Z = 5,060' TVDss
5,0171 FSL, 4,7951 FEL, Sec. 26, T11N, R12E
X = 61 Y = Z = TVDss
2,4561 FSL, 1,5361 FEL, Sec. 22, T11 N, R12E
X = 617,009.00 Y = 5,957,509.00 Z = 4,985' TVDss
5,0171 FSL, 4,7951 FEL, Sec. 26, T11 N, R12E
X = 619,076.00 Y = 5,954,823.00 Z = 4,980' TVDss
I Rig: I Doyon 14 ,/
I
I
86.90' I
I Estimated Start Date: I May 19th 2002 I
OBa MD
OBc MD
OBd MD
11,313'
11 ,324'
11,330'
I Operating days to complete: I 40.14
Oba TVDrkb: TD 5,067 OBa Max Inc. 92° I KBE I
OBc TVDrkb: TD 5,142 OBc Max Inc. 91 °
Obd TVDrkb: TD 5,192 OBd Max Inc. 90°
USH grassroots multi-lateral with extended horizontal laterals. 4- Y2" Gas Lift / Jet
Pump completion.
Scope of Wor~~ Surface Hole (5" DP):
. Drill 12-1/4" Surface hole to ::t 3,996' MD just below the SV1 sand
. Run and cement 9-5/8" ,casing to surface. Conduct FIT: 11.6 ppg EMW ,/
Intermediate Hole N DP):
. Drill 8 3,4" int. hole to ::t 7,750' MD. Land int. hole in OBd reservoir @ :t:84°.
. Run and cement 7" casing. Conduct FIT: 12 ppg EMW "..-
\ Production Hole(Lat #1 (3-%" DP):
. Drill out shoe and drill a 6-1/8",3,577' horizontal lateral in OBd. /
. Run 4 Y2" slotted liner with hanger and liner top packer.
Production Hole(Lat #2):
. Run whipstock to top of OBc interval at:t: 7,343' MD. Mill window in 7" casing.
'd-()"d--<::S;.<t> . Drill a 6-1/8",3,983' horizontal well in the OBc. Pull Whipstock. /
. Run 4 Y2" slotted liner with Backer Hook Hanger."
Production Hole(Lat #3):
. Run whipstock to top of OBa interval at:t: 7,093' MD. Mill window in 7" casing.
~-(::)<1.~ . Drill a 6-1/8",4,222' horizontal well in the OBa. Pull Whipstock.
. Run 4 Y2" slotted liner with Backer Hook Hanger. /
Completion:
. Complete well with a 4-Y2" tubing Gas Lift / Jet Pump completion. /
Well Design:
,
~~
\XL~\~
.,/
./
/
./
Version #2, 4/29/2002
"
.'
(
2. Current Well Information
Greater Prudhoe Bay Polaris W-203 Permit
('
2.1 General
Well Name:
API Number:
Well Type:
Current Status:
BHP:
BHT:
2.2 Mechanical Condition
W-203:
Doyon 14:
Conductor:
2.3 Target Estimates
W -203
Development - Polaris Schrader Bluff Multilateral Producer /'
New well, 20" X 34" insulated conductor to be set
2,250 psi @ 5,025' TVDss (8.6 ppg EMW). Normal pressure gradient.,/'
80°F @ 5,025' TVDss Estimated (SOR)
Cellar Box above MSL = 52.9'
KB I MSL = 34.0'
20" X 34", 215.5Ib/ft, A53 ERW set at 114' RKB
Estimated Reserves: 4,306 mstb (primary), 6,191 mstb (primary + WF)
Expected Initial Rate: 3,575 stb/d
Expected 6 month avg: 2,915 stb/d
2.4 Materials Needed
Surface Casing:
Intermediate Casing:
3 x Production Liners:
L-80 Completion:
4,000'
1 each
1 each
30 each
1 assembly
1 each
1~
/3,8<ti"
\.ieáCh
1 each
6 each
39 each
2 each
48 each
2 lots
3 each
9-%",40#, L-80 BTC Casing
9-%", BTC Float Shoe and Float Collar
9-%", 40#, BTC Type TAM Port Collar
9-%" x 12 %" Bow Spring Centralizers
FMC 11" 5m Gen 5 Wellhead System
9-%" TAM Port Collar
9-%" casing pups 5', 10', 20'.
7" 26# L-80 BTC-M Casing
7" BTC-M Float Shoe and Float Collar
7" 26# BTC-M Type "H" ES cementer
7" x 8-%" Steel In-Line Centralizers
7" x 8 %" Bow Spring Centralizers
7" x 8 %" Rigid Straight Blade Centralizers
7" Stop collars
7" casing pups 5', 10', 20'
7" casing RA tags
11,800'
400 each
7" x 4 %"
4 Y2"
2 assemblies
1 each
2 each
4 Y2", 12.6#, L-80, IBT-Mod Slotted Liner
4 %" x 5 3,4" x 8" Straight Blade Centralizers
Baker ZXP Liner Top Packer
Baker guide shoe with pack off bushing
Baker Level 3 Hookwall Hangers
Baker SC1 Retrievable packer
Halliburton XN-Nipple (3.725" ID)
4 Y2" 12.6 I bItt , L-80, BTC-M tubing
Baker PRM Packer 7" X 4-%"
4-%" Halliburton XD Durasleeve
Halliburton X-Nipple (3.813" ID)
Cameo 4-%" X 1" KBG2 Gas Lift Mandrels
11" X 4-%" FMC tubing hanger
4-1/16", 5m Cameron Tree
7,000'
1 each
1 each
3 each
3 each
1 each
1 each
2
.'
( .
3. Drilling Program Overview
3.1. Surface and Anti-Collision Issues
Greater Prudhoe Bay Polaris W-203 Permit
(
Surface Shut-in Wells: No wells need to be shut-in for the rig move on and off W-203.
Close Approach Wells: There are NO close approach wells associated with this profile.
Well Name
Current
Status
N/A
Production Priority
N/A
N/A
3.2. Well Control
Expected BH P
2,281 psi @ 5,100'
TVDss (estimated)
Max Exp Surface Pressure
1 ,694 psi
(0.115 psi/ft gas gradient)
3.3. Mud Program
12 1A," Surface Hole Mud Properties:
Density (ppg) Funnel vis
8.6 - 9.2 /' 150 - 300
VP
25 - 48
8 3A" Intermediate Hole Mud Properties:
Density (ppg) Funnel vis VP
8.6 - 9.2 / 45 - 55 21 - 28
6 Va" Production Hole Mud Properties: OBa/OBc/OBd
Density (ppg) Chlorides VP
9.2 / 20,000 ppm 22 - 27
Precautions
N/A
BOPE Rating
5,000 psi WP
(entire stack & valves)
Planned BOPE Test Pres.
3,500/250 psi Rams & Valves ./
2,500/250 psi Annular
I Spud - Freshwater Mud (PHPA)
Tauo PH API Filtrate
5 - 8 8.5 - 9.5 < 15
Freshwater Mud (PHPA)
Tauo PH API Filtrate
3 - 6 8.5 - 9.5 < 5
KCL - CaC03 BaraDril-N Mud
MBT pH HTHP@100°
<4 8.0 - 8.5 < 10
LG Solids
<6.5
LG Solids
< 20
LG Solids
< 12 ppb
NOTE: See attached Baroid mud recommendation
LCM Restrictions: No Organic LCM products in the Schrader Bluff formation
Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to DS-4 disposal site -
Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste.
Exempt liquid wastes can be taken to DS-4 or Phillips KRU 1 R.
3
Greater Prudhoe Bay Polaris W-203 Permit
3.4. Formation Markers ( ('
Formation Tops ftMD ft TVDss ft TVD Pore psi EMW (ppg) Hydrocarbons
SV5 2,034 1,820 1,907 819 8.7
Base Permafrost 2,071 1,850 1,937 833 8.7
SV4 2,197 1,950 2,037 878 8.7
SV3 3,034 2,500 2,587 1,125 8.7 Pass. Hydrates 1
SV2 3,318 2,680 2,767 1,206 8.7 Pass. Hydrates
SV1 3,838 3,010 3,097 1,355 8.7 Pass. Hydrates
UG4 4,343 3,330 3,417 1 ,499 8.7
UG4A 4,422 3,380 3,467 1,521 8.7 Pass. Heavy Oil /~
UG3 5,005 3,750 3,837 1,688 8.7 Pass. Heavy Oil
Fault 1 4,185 N/A --1'
Ma 6,172 4,490 4,577 2,021 8.7 Pass. Heavy Oil
Mb1 6,269 4,550 4,637 2,048 8.7 Pass. Heavy Oil
Mb2 6,361 4,605 4,692 2,072 8.7 Pass. Wet
Mc 6,456 4,660 4,747 2,097 8.7 Pass. Wet
Fault 2 4,745 N/A
Na Faulted N/A Pass. Heavy Oil
Nb Faulted N/A Pass. Wet
Nc 6,741 4,810 4,897 2,185 8.7 Oil
OA 6,940 4,900 4,987 2,195 8.6 Wet
OBa 7,092 4,960 5,047 2,225 8.6 Oil
OBb 7,208 5,000 5,087 2,235 8.6 Oil
OBc 7,343 5,040 5,127 2,242 8.6 Oil
OBd 7,620 5,100 5,187 2,281 8.6 Oil
OBe Nat Reached 5,165 N/A 2,310 8.6 N/A
3.5. CasinglTubing Program
Hole Size Csgl WtlFt Grade Conn Length Top Bottom
Tbg O.D. MD I TVDrkb M D I TVDrkb
48" 20" X 34" 215.5# A53 Welded 80' 34' / 34' 114' / 114'
12-%" 9-%" 40# L-80 BTC 3,958' 34' / 34' 3,996' /3,197'
8-3,4" 7" 26# L-80 BTC-M 7,716' 34' / 34' 7,750' /5,203'
6 %" OBa 4 Y2" Slatted 12.6# L-80 IBT 4,222' 7,093' /5,047' 11,313' /5,067'
6 %" OBc 4 Y2" Slatted 12.6# L-80 IBT 3,983' 7,343/5,127 11,324 / 5,142'
6 %" OBd 4 Y2" Slatted 12.6# L-80 IBT 3,677' 7,650' / 5,192' 11,330' /5,192'
Tubing 4 Y2" GL 12.6# L-80 IBT -Mad 6,966' 34' / 34' 7,000' /5,013' /
4
3.6. Cement Calculations
)
Greater Prudhoe Bay Polaris W-203 Permit
')
Casin~ Size 9-%-in 40-lb/ft L-80 BTC - Single Stage
Basis 1250% excess over gauge hole in permafrost interval, 300/0 excess over gauge hole below permafrost
Total Cement Volume: Tam Port collar located at 1,000' as a contingency for cement to surface
Wash 10 bbls CW100
Spacer 75 bbls of Viscosified Spacer weighted to 10.20 ppg
Lead 498 bbls (630 sks)10.7 Ib/gal Permafrost L cement - 4.44 'éyft/sk
Tail ,,57 bbls (274 sks (15.8 Ib!gal Class G + adds - 1.17 cuft/sk
Temp' I BHST::::60~FÚom SOR,BHCT 80° F estimated by Dowell
CasinQ Size 17" 26 Ib/ft L-80 BTC-M - Single Stage
Basis I 30% excess - TOC: 500' MD above the Ma sands (planned TMa: 6,168' MD) => 5,668' MD
Total Cement Volume: Wash 20 bbls'CW1 00
Spacer 50 bbls of Viscosified Spacer (Mudpush XL Design) Weighted to 10.6 ppg
Tail 74 bbls (356 sksr1 0.7 Ib/gal Class D-600G Latex (.1 Î
Temp I BHST == 80° F from SOR, BHCT 85° F estimated by Dowell
.,//
3.6.1. 9-%" Casing Centralizer Placement
a) Run (25) 9-%" Bow-spring centralizers floating in the middle of each joint of casing from the
casing shoe up to 2,996' MD (1,000' MD above the shoe).
b) Run 2 Bow-spring centralizers on either side of the TAM Port Collar.
c) The centralizer program is subject to change pending actual hole conditions.
3.6.2. 7" Casing Space Out
a) Space 7" casing out with pups and long/short joints as required to place the top of a long full joint
at the actual top of each sand to allow for the window to be milled just below the top of each
sand and in the middle of a full joint of casing.
b) Place 1 RA tag above the first window, 1 RA tag above the second window, and 1 RA tag above
the third window.
c) Emergency 7" casing slips can be used instead of the 7" mandrel hanger if required for space
out.
3.6.3. 7" String Centralizer Placement
a) Do not run centralizers on the window joints spaced at the top of each sand.
b) Run one in-line centralizer above and below each window joint.
c) Place 2 centralizers rigid straight blade centralizers back to back at the very bottom of the shoe
joint. Do not run any centralizers on the next two full joints (see illustration at the end of the
wellplan) .
d) With the exception stated above, alternate 1 bow spring cenralizer floating across a full joint and
2 bow spring centralizers, one floating on the upper half of the joint and one floating on the lower
half of the joint separated by a stop collar up to 5,668' MD (500' MD above Ma sand). Zonal
isolation with cement is required between the top of the OBa and base of the OA sands. The
centralizer program is subject to change pending modeling and hole conditions. See attached
drawing.
3.6.4. 4 Y2" Slotted Liner Centralizer Placement
a) Run one straight blade rigid centralizer per joint with no stop collar (i.e. free floating across the
whole length of the joint) for the whole string.
5
3.7. Survey and Logging prog~am
Greater Prudhoe Bay Polaris W-203 Permit
')
12-%" Hole Section:
Open Hole: MWD , GR
Cased hole: None
8-%" Hole Section: MWD' GR' Res' PWD' Den' Neu
Cased Hole: USIT Bond
6 Ya" Hole Sections: MWD' GR' Res' PWD' Den' Neu' ABI' ABGR - (ABGR will be run if available)
Cased Hole: None
3.8. Bit Recommendations
BHA
Number
Surface
I nterm.
OBa lat.
OBc lat.
Obd lat.
Hole Size
and Section
12-%"
8-%
6%"
6%"
6%"
Depths (MD)
0' - 3,996'
3,996' -7,750'
7,750' - 11,330'
7,338' - 11 ,324'
7,088' - 11,313'
Bit Type
Nozzles
K-Revs Hours
Smith FGXi (Twist & Shout)
TBD
TBD
TBD
TBD
*
3.9. Motors and Required Doglegs
BHA No. Motor Size and Motor Required Flow Rate RPMs Required Doglegs
1 8" Sperrydrill 6n, 4 stg Mud Motor, 1.50 adj. with 400 - 650 60-120 1.5°- 2.5°/100' initial bui~,
12" screw on stabilizer gpm 4°/100' final build
2 7" Sperrydrill 7/8, 6 stg FTC Performanc motor, 500 - 600 60-120 3.5°/100' build
with 1.220 adj. with 8.6" concentric sleeve gpm to horizontal /
3&4 4 %" Sperrydrill 4/5, 6.3 stg FTC Performance, 250-275 60-100 Maximum build = 12°/100'
1.5° adj with 5.8" concentric sleeve and ABI gpm out of window
6
) )
W-203 RiQsite DrillinQ Hazards and ContinQencies
,POST THIS NOTICE IN THE DOGHOUSE
I. Well Control
A. The Schrader Bluff in this fault block is expected to be normal pressured at 8.6 ppg EMW. This
pressure is estimated based on the initial static on W-200 (Dec-99). '
II. Hydrates and Shallow gas
A. Hydrates have not been a significant issue thus far on W-Pad during the recent drilling of W-211 and
W -212, however there is always a potential.
III. Lost Circulation/Breathing
A. Lost circulation is unlikely.
B. Breathing will not be an issue as we are not drilling below the Schrader Bluff.
IV. Kick Tolerance/Integrity Testing
A. The 9-%" casing will be cemented to surface. The top of the 15.8 Ib/gal tail cement slurry is planned to be at
-3,292' MD.
B. The 7" casing will be cemented with 15.8 Ib/gal tail cement slurry to 500' MD above the Ma Sands -5,668' MD
C. The Kick Tolerance for the surface casing is 53.3 bbls with 9.2 ppg mud, 11.6 ppg FIT, and an 8.7ppg pore
pressure.
D. The Kick Tolerance for the intermediate casing is infinite with 9.2 ppg mud.
E. Integrity Testing
V.
Test Point
9-%-in shoe
7-in shoe
Test Depth
20-ft minimum from 9-%--in shoe
20-ft minimum from the 7-in shoe
Test type
FIT
FIT
EMW (lb/gal)
11.6 minimum
12.0 minimum
Stuck Pipe
A. We do not expect stuck pipe.
B. There could be slight differential sticking issues with the liners. Centralizers will be run to mitigate.
VI. Hydrogen Sulfide
A. W Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions
should be followed at all times. Water injection on W -Pad was initiated in late 2001, and H2S levels
are expected to remain low until the waterflood matures. Recent H2S data from the pad is as follows:
B. Adjacent producers at Surface:
a. W -12: less than 8 ppm
C. Adjacent producers at TO:
a. W -200: 0 ppm
D. The maximum recorded level of H2S on the pad was under 20 ppm.
VII. Faults
A. The planned directional trajectory crosses two faults. These faults have been previously crossed at
similar TVD's by W-01 with no problems associated with them.
B. Fault #1: 5,691' MO 4,272' TVD 4,185' TVDss
C. Fault #2: 6,613' MD 4,832' TVD 4,745' TVDss
CONSULT THE W PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION
Version 1.0
W -203 ML Hazards and Contingencies
Page 1 of 1
POST-COMPLETION
W-203, W-203 L 1 & W-203 )Z
TREE: FMC 4-1/16" 5M
WELLHEAD: FMC Gen 5 System
11", 5M csg,head wI?" mandrel hanger & packoff
11" x 11", 5M, tbg spool wI
11" x 4-1/2" tubing hanger
11" X 4-1/16" Adaptor Flange
~"92 Ib/ft, H-4Q Welded I 114' I
. ~ 9-518" TAM PortCoUar I 1,000' I
, " Halliburton X-Nipple (3.813" ID) 12,200' TVD I
c=. Camco gas lift mandrel 4-1/2" x 1" KBG2 I 3,000',4,500',4,700' TVD I
f With RP Shear Valve in top mandrel
/ 4-1/2", 12.6 I bitt, L-80, BTC-M
Coupling 00: 5.2"
OriWIO: 3.833"/3.958"
) ... 9-518", 40 ppg L-BO BTC-M Csg @ 3,996' MD
I -6,700' 1
1 -6,900' 1
1-7,000' 1
1
Orig KB elev (0-14) = 34.0' I
...
[]
...
4.5" HES XD Durasleeve with 3.813" 10
7" X 4,5" Saker PRM Packer
Halliburton X-Nipple (3.813" 10)
9.2 PPG SaradrilN mud below Completion
Saker Hughes Hookwall Hanger @ 7,083' MD
(3.958" 10 out into lateral - 4.125" ID down)
Window in 7" casing@ 7,093' MD /
Well Inclination @ Window = 67°
, ~\~~:'~'~~..:~'3"';,.",",",.', :;~,?7.F,'~ .,~r'~~.,": r,~ ., "'~ilt, ~~,:,~.,~,.":"~:., ;~,.'~, '.,":, ",'..,..~, '~,",t,:
= =1 = = = = =~>', '!
,~,.":!;,»~.,~".,,..J.III.';". ....... III w"..;. ... ......... .. 'W". .1...,...." . 'w ... ..
6-1/8" OBa Lateral 17,093'-11,313'1
'--).
--- Saker Packer
1-7,176' 1
7", 26#, L-80, BTC-M
Casing Oritt: 6.151"
Casing 10: 6.276"
RA Tag
';;"~:I¡0Æ0ii:7?'è"', '7 "C., 7".7":'., ,"~~ 7",~," '~, "7:7~l, ,,~'" 7"~,7''':'~, ""',',.,.,.,.,,,~,..,','.,.,",:',',",:,', ",...,"',', .".'.,':,',".','., ",
:: ::1 :: = =~ = =1)':""'.,,,':
- - - - - - - ",:.','. ,',' ,';'.;:.
. .,...:1":,,,,,:,,. ,', .',,, ,:~~,.,.,..,.,.~.~........,.,...., ,¡--.'. ~.._... .'.' .'.Ii. ~~. ... _.1
::1. :":~~~",,.,~,'t I
6-1/8" OBc Lateral 17,343'-11,324' 1
\.:~
Halliburton XN-Nipple (3.725" 10)
Saker Hughes Hookwall Hanger @ 7,333' MO
(3.958" 10 out into lateral- 4.125" 10 down)
Window in 7" casing@ 7,343' MO
Well Inclination @ Window = 74°
7" Casing Shoe @ 7,750' MO/5,195' TVO
~ ~ ~=.:...:....1f¡).J
6-1/8" OBd Lateral 17,750'-11,330'1
'-À) -~a 3
POLARIS
WELL: W-203 ML
API NO:
Saker ZXP Liner Top Packer & Hanger @ 7,650' MD
DATE
REV. BY
COMMENTS
4/16/2002
MIK TRIOLO
level 3 Multi-lateral, 3 1/2" Gl Completion
GPB DRilliNG AND WEllS
spef""'a .:/-5Ufl North Slope Alaska
~~.tL,.I,,,JN,lI._u$_t¡¡I_f1.Vi~Jt~ 8 P XA
A H.Hiþ,,(1on COmpany
PBU WOA W Pad
w-2õ3 WP06
DrllfQuest~
Measured Incl. Azlm, Vertical Northlngs Eastlngs Vertical Dogleg
~ Depth Depth Section Rate
0
g -4000 - 0,00 0,000 0,000 0.00 O,OON OJJO E OJJO
~ 303,90 0,000 0,000 303,90 0.00 N O.OOE OJJO 0,000
II 503,'10 3.000 90,000 503,81 O,OON S,23E 4,56 1500
t\53,90 t\.!KIO 90,000 65133 O,ooN 17,OOE 14.81 2,000
.c: 1 R45,29 35,785 9(J,000 175190 O,ooN 437,IOE 380,81 2500
Ü 2091.84 35,785 <)(JJJOO 1953,90 O,ooN 581.27 E 506.41 (WOO
,s:: 2473"B 50,639 95.222 2231.40 13.51 S 841.35 E 739,62 4,000
~ 6136,1.' 50,639 95,222 4554,25 271.25 S 366 1.38 E 3323.00 0.000
(l) 7MU3 &1.52& 143,463 51'1L20 976.30 S 4768,81 E 4633,93 3.500
ro 794(1,M 90.33& 143,274 5211.'10 120'1,8'1 S 4942,49 E 4899,91 3,017
Ü I I 329,<J5 <JO,33& 143,274 51'11.90 3926.40 S 696'1,22 E 7999,17 0.000
Cf)
I I I I I
0 1000 2000 3000 4000 5000
Scale: 1 inch = 1000H Eastings (W ell)
,.....",,... -."" ^^ ^^ ^^""
0
-1000 -
..--.
Q)
~ -2000 -
(/)
0)
c:
:ë
t
0
Z
-3000 -
bp
~~~'<1~
~'4 . . ',' .~
~ ì
Iff ~i
~tÝ:' ~~
fÞ' t t:-.-" <~: ~ i ,l -', 'I
Current Well Properties
W -203 W P06
5958645.07 N, 612049.02 E
1418.92 N, 2155.01 E
70017' 45.4663" N, 149005' 33.6465" W
Well:
Horizontal Coordinates:
Ref. Global Coordinates:
Ref. Structure Reference:
Ref. Geographical Coordinates :
RKB Elevation:
86.90ft above Mean Sea Level
86.90ft above Structure Reference
True North
Feet (US)
North Reference:
Units:
'.'1-203 ,Fault 1
~.,,'" 12"14;~\~"
\ ð ~~
~ ~ ')c-.., "0' C ~~ ()~
~~ c-""Ð~~ (O~.s-Ð ~ d' ()~ l§) '.s-~,?,
()~ 9 ~ C ~ ()/. ~'?' d' ~°o. ~-1-
l§) ~ ~ .... ~ "-1- ~. ~
'$00. 1I~"'19 ~"'Ð ~ ~ V$ ""0<3,. ~6'~
?oo.,. @ ~o. ~$o. '><ft. "~0.9 09:.~
.,~ ~o;., ~~o. ,,~c9. ~.o- ~~
q¡ "0. í':\,. ~ >".,. '$~
'.9<3,. ~. -?'.- '~.9~ ~() \?'~()
~() '.1òv ~<?Q. ~() '{ø~ '~iÞ.
'Vo .~ ".,. '~~ í?~, ")' 9J
'?.9o" ~ ~() ~~ í?.9o. '?¡o 1., , ~.,.^
I'lþ , &ò 6'{¡ ~1., () . ~
<:> ~c9 'V~ <:>
~ \?'lþ
~() ()
W-203 Faull 1
JBegln 8-3/4" Hole Size
¡çoooo
- .""00,00
, ¡roo,(p
9 518" Casing
3995.90ft MD
3196.90ft TVD
..----Begin Dlr @ 3.500'/1000: 6136.13ft MD, 4554.25ft TVD
1'00.00 ..----
I
-Total Depth: 11329,95ftMD,5191.9OOTVD
----
./ W-203 Polygon
.;/ ,~W-203 Driller's Poly @ 95%
(~.:,06~'" ..."",..... -Decrease In Dlr Rate @ 3.017"/100ft: 7648.53ft MD, 5191,2011 TVD
End Dlr, Start Sail @ 90.338': 7940.64I1MD,5211.90ftTVD
Proposal Data for W.203 Main OBd WP06
~~~~~~t~t~i~g:in :
Measurement Units:
North Reference:
Well
Well
It
True North
W-203 ODd Tlll
5191.90ft TVD
3926.40 J. 6969,22 E
/
/
/
/
/
/
/,..,-/
,-'
Dogleg severity: Degrees per 100 feet (US)
Vertical Section Azimuth: 119.400'
Vertical Section Description: Well
Vertical Section Origin: 0,00 N,O.OO E
4-1/2" Liner
11329,95ft MD -
~
'11-203 Fault 3
I
6000
I I
7000 8000
Reference is True North
PBU_WOA W Pad
W-203 WP06
spet'""1 ¿-sur, North Slope Alaska
P:-~!,""'_L,.,JN_c¡_s.~ll!ltYJ~J:jL~ 8 P XA
A Hllrtburton COmp.ny
1000 -
~ 2000 -
~
.!:
ã..
Q)
0
ëõ
.52 3000 -
t
Q)
>
4000 -
õ
0
0
II
.r:
ü
.S 5000 -
~
ro
ü
U)
""'.""""'" ..."'^^....^^"'"
DrlllQuest~
Proposal Data for W-203 Main OBd WP06
Vertical Origin:
Horizontal Origin:
Measurement Units:
North Reference:
Well
Well
ft
True North
Dogleg severity : Degrees per 100 feet (US)
Vertical Section Azimuth: 119.400°
Vertical Section DescriptionWell
Vertical Section Origin: 0.00 N.O,OQ E
Measured Incl. Azlm. VertIcal Northlngs Eastlngs Vertical Dogleg
Depth Depth Section Rate
0,00 0,000 o.()oo 0,00 O.ooN 0.00 E 0,00
303,90 0.000 0,000 303.90 O,OON O,OOE 0.00 0,000
503.90 3,000 90,000 503.81 O.OON 5.23 E 4.56 1.500
653.90 6,000 90.000 653.33 O.OON 17.00E 14.81 2.000
1845,29 35.785 90.000 1753.90 O.ooN 437.10 E 380.81 2.500
2091.84 35.785 90.000 1953.90 O.ooN 581.27 E 506.41 0.000 ~
2473,53 50.639 95.222 2231.40 13.51 S 841.35 E 739.62 4,000
6136.13 50.639 95.222 4554.25 271.25 S 3661.38 E 3323.00 0.000
7648.53 81.528 143.463 5191.20 976,30 S 4768.81 E 4633.93 3.500
7940.64 90,338 143.274 5211.90 1209.89 S 4942.49 E 4899.91 3.017
11329.95 90.338 143,274 5191.90 3926.40 S 6969,22 E 7999.17 0.000
~
,4þ'
..
1.'
~
0
........-- BegIn 12.1/4" Hole Size
Begin Dlr @ 1,5000/100It: 303,90lt MD, 303,90ft TVD
/ Increase In Dlr Rate @ 2.000°/10011 : 503.901t MD, 503,81ft TVD
/ Increase In Dlr Rate @ 2.500°/10011 : 653,90lt MD, 653.33ft TVD
~
...."--'
---'
Current Well Properties
W -203 W P06
5958645.07 N, 612049,02 E
1418.92 N, 2155.01 E
70017' 45.4663" N, 149005' 33.6465" W
End Dlr, Start Sail @ 35,785° : 1845,29ftMD,1753.90ttTVD
Well:
Horizontal Coordinates:
Ref. Global Coordinates:
Ref. Structure Reference:
Ref. Geographical Coordinates:
RKB Elevation:
86.90ft above Mean Sea Level
86.90ft above Structure Reference
True North
Feet (US)
Begin _D.!! @ 4,OOO!1~Oft: 2091.~4!!.MD,1953..:.90..!t TVD - - - - - _SV5, 1906,9Oft TVD
, .-""m..m. ." ,,- """'",,,,,,,- ." ,- ._----- .. "'- --- - - - - - ------ -. -- '-Bns& P",ma"Q51. 1936,!)Oft TVD
- - - - - - - - - - - - - - - - - - - - --$V4, 2036.9011 TVO
End Dlr, Start Sail @ 50,639° : 2473.53ftMD,2231.4OftTVD
North Reference:
Units:
..;.00- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _SV3. 2S8e.90flTVD
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - _$V2, 2766.90ftTVO
Begin 8-3/4" Hole Size '
- - - - - - - - - - - ---- - - ---- -- ------ - - - ---- - - _$VI, 3!)¡)6,90ltTVO
200,00
- - - --- -- - - - ---- - - ---- -- - - ---- - - - ---- - - _UG4, 3411J,90IITVO
-- - - - - ---- - - - --- - - - - - - - - - - - - ---- - - ----UG4A. 3466,90fITVO
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _UG$. S836,90flTve
- - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - _Fml~', 4271.90ftTVD
Begin Dlr @ 3,5000/100ft : 6136.13ft MD, 45S4,25ft TVD
I
0 1000
Scale: 1 inch = 1000ft
---- - _:-. - - - - - - - - - -- - -- -- - - - -- - -- - - - - - - - ..--Ma, 4576,9011 TVO
- - - - -- - - - - - - - - - - - - - - - - - - - - - - - -MI>1, 46.%,9011 TV!)
- - ---- - - ---- - - - - ---- - - - ----- - -Mb2, 4691.9GftTVO
- --00- - - - - - - - - - - - - - - - - - - - - - - - - - - -~)~C:) 41~.~-o!!TVO
.'"--FauIl2. 4831.9011 TVO
- - - - - - - - - - - - - - - - - - - - - - - - - - -Nc, 4695.9OftTVD
- --~~ -~~ ~~ ~~~~~ ~~ ~~ ~~ 8~:418!l¡g~1~ß
" ~7~"" - - ~- - --¡f'JCO,Ot:J- - W(IOPO, JØ200nQ JOOOODO~ - _Olk 5126.9G1I Tve
Decrease In Dlr Rate@3.017°/100lt:7648.53ftMD,5191.20ftTVD- ~~;;;----- \'/.203 08d ï1a W-203 Main ÕSd WP06 W-2;3 OBd nIl ~..-,,.,,- 4-1/2" Llne~Bd, 5taG.90ft TVO
775000ftMO "'"--521'.00fl:TVD St_1.9ûftTVo--
End Dlr, Start Sail @ 90.338° : 7940.64ttMD,5211.901tTV 520Ù7ftTVD 1209,89 S, 49<12.49 E 3926.40 S, 6969.22 E Total Depth: 11329.95ftMD¡5191.90ftTVD
I I I I I I I
2000 3000 4000 5000 6000 7000 8000 9000
Vertical Section (Well) Section Azimuth: 119.400° (True North)
--~--_._.._--_.._.._--_..-
.........-.-..-.-.-..-..-.-..-.--.-..-.----
North Slo
BPXA
. 'PBU_,t1!°A W Pad, Slot W-203
W~203 WPS - W-203 Main OBd WP06
Revised: 23 April, 2002
~
PROPOSAL REPORT
25 April, 2002
~
Surface Coordinates: 5958645.07 N, 612049.02 E (700 17' 45.4663" N, 149005' 33.6465" W)
Surface Coordinates relative to Project H Reference: 958645.07 N, 112049.02 E (Grid)
Surface Coordinates relative to Structure Reference: 1418.92 N, 2155.01 E (True)
Kelly Bushing: 86.90ft above Mean Sea Level
spe""''''''y-sul!
PRILI.:-}NG SERVices
A Halliburton Company
Proposal Ref: pro11177
Sperry-Sun Drilling Services
Proposal Report for W-203 WPS - W-203 Main OBd WP06
Revised: 23 April, 2002
BPXA
North Slope Alaska PBU_WOA W Pad
¿Æ1%
Measured Sub-Sea Vertical Local Coordinates Global Coordinates: , : Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings, Rate Section Comment
(ft) (ft) (ft) (ft) (ft) eft) eft CO/100ft)
0.00 0,000 0,000 -86,90 0.00 0.00 N 0.00 E 5958645.07 N 612049.02 0.00 Begin 12-114" Hole Size
100,00 0,000 0.000 13,10 100.00 0.00 N 0,00 E 5958645.07 N 612049,02 E 0.000 0.00
200,00 0.000 0,000 113,10 200.00 0.00 N O,OO,E 5958645.07 N 612049,02 E 0.000 0.00
300,00 0.000 0,000 213,10 300.00 0.00 N O,OOE 5958645.07 N 612049.02 E 0.000 0.00
303.90 0.000 0,000 217,00 303.90 0.00 N 0.00 E 5958645.07 N 612049,02 E 0.000 0.00 Begin Dir @ 1.5000/100ft: 303 ,,-<t
MD, 303.90ft TVD '~
400,00 1 .441 90,000 313,09 399.99 1,21 E 5958645.09 N 612050.23 E 1.500 1.05
500,00 2.941 90,000 413,01 499.91 5.03 E 5958645.1 5 N 612054.05 E 1.500 4.38
503.90 3,000 90,000 416.91 503.81 5,23 E 5958645.15 N 612054.25 E 1.500 4.56 Increase in Dir Rate @ 2.0000/100ft :
503.9Oft MD, 503.81ft TVD
600.00 4.922 90.000 512,77 11 .87 E 5958645.25 N 612060.89 E 2.000 10.34
653.90 6.000 90.000 566.43 17,00 E 5958645.32 N 612066.02 E 2.000 14.81 Increase in Dir Rate @ 2.5000/100ft :
653.9Oft MD, 653.33ft TVD
700.00 7.152 90.000 0.00 N 22,28 E 5958645.40 N 612071.30 E 2.500 19.41
800,00 9,652 90,000 O.OON 36.89 E 5958645.62 N 612085.91 E 2.500 32.14
900.00 12,1 52 90,000 0.00 N 55.81 E 5958645.90 N 612104.82 E 2.500 48.62
1000.00 14.652 90.000 0.00 N 78.98 E 5958646.25 N 612127.99 E 2.500 68.81
1100.00 17.1 52 90,000 0.00 N 106.38 E 5958646.66 N 612155.39 E 2,500 92.68
1200,00 19,652 90,000 1097,64 1184.54 0.00 N 137.95 E 5958647.13 N 612186.95 E 2.500 120.18
1300,00 22.1 52 90.000 1191,06 1277.96 0.00 N 173.62 E 5958647.66 N 612222.62 E 2.500 151.26
1400,00 24.652 90.000 1282,82 1369,72 0,00 N 213.34 E 5958648.25 N 612262.33 E 2.500 185.86
1500.00 27.1 52 90.000 1372,77 1459.67 O.OON 257,02 E 5958648.90 N 612306.01 E 2,500 223.92
1600,00 29,652 90.000 1460.72 1547.62 O.OON 304.58 E 5958649.61 N 612353.57 E 2.500 265.35
1700,00 32.152 90.000 1546,52 1633.42 0.00 N 355.93 E 5958650.38 N 612404.92 E 2.500 310.10 '-.-'
1800.00 34.652 90,000 1630,00 1716.90 0.00 N 410.98 E 5958651.20 N 612459.96 E 2.500 358.05
1845,29 35.785 90.000 1667.00 1753,90 0.00 N 437.10 E 5958651.59 N 612486.07 E 2.500 380.81 End Dir, Start Sail @ 35.785° :
1845.29ftMD,1753.90ftTVD
1900.00 35,785 90.000 1711.38 1798.28 0.00 N 469.09 E 5958652.06 N 612518.06 E 0.000 408.68
2000,00 35,785 90.000 1792.50 1879.40 0.00 N 527.57 E 5958652.94 N 612576.53 E 0,000 459.62
25 April, 2002 - 8:36
Page 2 of 13
DrillQuest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for W-203 WPS - W-203 Main OBd WP06
Revised: 23 April, 2002
BPXA
North Slope Alaska PBU_WOA W Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Inct. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) , ' (ft) '.~}ù e/100ft)
2033.90 35,785 90.000 1820.00 1906,90 0.00 N 547.39 E 5958653.23 N 612596.35\E" 0.000 476.89 8V5
2070.88 35,785 90.000 1850.00 1936.90 0.00 N 569.01 E 5958653,55 N 612617.97 E 0.000 495.73 Base Permafrost
2091.84 35,785 90,000 1867.00 1953.90 0.00 N 581.27 E 5958653.74 N 612630.22 E 0.000 506.41 Begin Dir @ 4,OOoo/100ft : 2091.84ft
5958653.80N MD, 1953.90ft TVD
2100.00 36,100 90,148 1873.61 1960.51 612635.01 E 4.000 510.58
2196.92 39,849 91,752 1950.00 2036.90 5958653.67 N 612694.63 E 4.000 563.02 8V4
~
2200,00 39.968 91,798 1952,36 5958653.64 N 612696.61 E 4.000 564.77
2300.00 43.857 93,202 2026.76 5958651,69 N 612763.36 E 4.000 624.34
2400,00 47,761 94.419 2096.46 5958647.96 N 612834.95 E 4.000 689.01
2473.53 50,639 95,222 2144.50 5958644.11 N 612890.48 E 4.000 739.62 End Dir, 8tart 8ail @ 50.639° :
2473.53ftMD,2231.40ftTVD
2500.00 50,639 95,222 2161 .29 861.73 E 5958642.55 N 612910.88 E 0.000 758.29
2600.00 50,639 95,222 2224}1'< 22.41 8 938.72 E 5958636.66 N 612987.97 E 0.000 828.83
2700.00 50,639 95,222 ,2288:13 29.458 1015.72 E 5958630.77 N 613065.06 E 0.000 899.36
2800.00 50,639 95,222 2351.55 36.48 8 1092.71 E 5958624.88 N 613142.16 E 0.000 969.90
2900.00 50,639 95,222 2414.97 43,52 8 1169.71 E 5958618.99 N 613219.25 E 0.000 1040.43
3000,00 50,639 95,222 2478.39 50.56 8 1246.70 E 5958613,11 N 613296.34 E 0.000 1110.96
3034.07 50,639 95,222 2500.00 2586.90 52.95 S 1272.94 E 5958611.10 N 613322.61 E 0.000 1135.00 8V3
3100.00 50,639 95,222 2541.81 2628.71 57,59 S 1323.70 E 5958607.22 N 613373.43 E 0.000 1181.50
3200,00 50.639 95,222 2605.23 2692.13 64.63 S 1400.69 E 5958601.33 N 613450.52 E 0.000 1252.03
3300.00 50.639 95.222 2668.65 2755.55 71.67 8 1477.69 E 5958595.44 N 613527.61 E 0.000 1322.57
3317.90 50.639 95,222 2680.00 2766.90 72.93 8 1491.47 E 5958594.39 N 613541.41 E 0.000 1335.19 8V2
3400.00 50.639 95.222 2732.07 2818.97 78,70 8 1554.69 E 5958589.55 N 613604.71 E 0.000 1393.10
3500.00 50,639 95,222 2795.49 2882.39 85,74 S 1631.68 E 5958583.66 N 613681 .80 E 0.000 1463.63 ~
3600.00 50,639 95,222 2858.92 2945.82 92.78 S 1708.68 E 5958577.77 N 613758.89 E 0.000 1534.17
3700,00 50,639 95,222 2922,34 3009.24 99.82 8 1785.67 E 5958571.89 N 613835.98 E 0.000 1604.70
3800,00 50,639 95,222 2985.76 3072.66 106.85 8 1862.67 E 5958566.00 N 613913.07 E 0.000 1675.24
3838,23 50.639 95,222 3010,00 3096.90 109.548 1892.10 E 5958563.75 N 613942.54 E 0.000 1702.20 8V1
3900.00 50.639 95,222 3049.18 3136.08 113.898 1939.66 E 5958560.11 N 613990.16 E 0.000 1745.77
3995,90 50.639 95,222 3110.00 3196,90 120.64 S 2013,50 E 5958554.46 N 614064.10 E 0.000 1813.41 Begin 8-3/4" Hole Size
9 5/8" Casing
4000.00 50.639 95.222 3112.60 3199.50 120.93 8 2016.66 E 5958554,22 N 614067.26 E 0.000 1816.30
4100.00 50.639 95.222 3176,02 3262.92 127.968 2093.65 E 5958548.33 N 614144.35 E 0.000 1886.84
25 April, 2002 - 8:36 Page 3 of 13 DrillQuest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for W-203 WPS - W-203 Main OBd WP06
Revised: 23 April, 2002
BPXA
North Slope Alaska PBU- WOA W Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
eft) eft) (ft) (ft) eft) (ft) (ftl"ù;;;;¡" (°/1 OOft)
4200.00 50.639 95.222 3239.44 3326.34 135.00 S 2170,65 E 5958542.44 N 614221.44'E 0.000 1957.37
4300.00 50.639 95.222 3302.86 3389.76 142.04 S 2247.64 E 5958536.56 N 614298.53 E 0.000 2027.91
4342.79 50,639 95.222 3330.00 3416.90 145.05 S 2280,59 E ' 5958534.04 N 614331.52 E 0.000 2058.09 UG4
4400.00 50.639 95.222 3366.28 3453.18 149.07 S 2324,64 E 5958530.67 N 614375,62 E 0.000 2098.44
4421,63 50.639 95.222 3380.00 3466.90 150.60 S 2341,29 E 5958529.39 N 614392,30 E 0.000 2113.70 UG4A
4500,00 50,639 95.222 3429,70 3516,60 2401 .63 E 5958524.78 N 614452.71 E 0.000 2168.97 .~
4600.00 50,639 95.222 3493,12 3580,02 2478.63 E 5958518.89 N 614529.81 E 0.000 2239.51
4700.00 50.639 95.222 3556,54 3643.44 2555.63 E 5958513.00 N 614606.90 E 0.000 2310.04
4800.00 50.639 95.222 3619,96 3706.86 632.62 E 5958507.11 N 614683.99 E 0.000 2380.57
4900,00 50.639 95.222 3683.39 3770.29 2709.62 E 5958501,23 N 614761,08 E 0.000 2451.11
,::;:~::,::~:~~-
5000.00 50.639 95.222 3746,81 3833.71 1911BO S 2786.61 E 5958495,34 N 614838,17 E 0.000 2521.64
5005,03 50,639 95.222 3750,00 3836.90 191.65 S 2790.49 E 5958495.04 N 614842.05 E 0.000 2525.19 UG3
5100.00 50.639 95,222 381,0,,23 3897.13 198.33 S 2863.61 E 5958489.45 N 614915.27 E 0.000 2592.18
5200,00 50,639 95.222 3873:65, ' 396Ò.55.. 205.37 S 2940.60 E 5958483.56 N 614992.36 E 0.000 2662.71
5300.00 50,639 95.222 3937.07' \;~023.97 212.41 S 3017.60 E 5958477.67 N 615069.45 E 0.000 2733.24
::>~::>'
5400,00 50.639 95,222 4000.49. 4087.39 219.45 S 3094.59 E 5958471.78 N 615146.54 E 0.000 2803.78
5500.00 50.639 95.222 4063.91 4150.81 226.48 S 3171.59 E 5958465.90 N 615223.63 E 0.000 2874.31
5600.00 50,639 95.222 4127.33 4214,23 233.52 S 3248.58 E 5958460.01 N 615300.72 E 0.000 2944.85
5690,93 50.639 95.222 4185,00 4271.90 239.92 S 3318.59 E 5958454.65 N 615370.82 E 0.000 3008.98 Fault 1
5700.00 50.639 95.222 4190,75 4277.65 240.56 S 3325.58 E 5958454.12 N 615377.82 E 0.000 3015.38
5800.00 50,639 95,222 4254.17 4341 .07 247.59 S 3402,57 E 5958448.23 N 615454.91 E 0,000 3085.91
5900.00 50,639 95,222 4317.59 4404.49 254,63 S 3479.57 E 5958442.34 N 615532.00 E 0,000 3156.45
6000.00 50,639 95.222 4381,01 4467.91 261.67 S 3556,56 E 5958436,45 N 615609.09 E 0,000 3226.98 ~
6100.00 50.639 95.222 4444.43 4531.33 268,70 S 3633.56 E 5958430,56 N 615686.18 E 0.000 3297.52
6136,13 50,639 95.222 4467,35 4554,25 271,25 S 3661 .38 E 5958428.44 N 615714.04 E 0,000 3323.00 Begin Dir @ 3.5000/100ft : 6136.13ft
MD, 4554.25ft TVD
6172.03 51,127 96.714 4490.00 4576.90 274.14 S 3689.08 E 5958425.95 N 615741.78 E 3.500 3348.56 Ma
6200,00 51.520 97.863 4507.48 4594.38 276.91 S 3710.74 E 5958423,51 N 615763.47 E 3.500 3368.78
6269,10 52.539 100.646 4550.00 4636.90 285,68 S 3764.49 E 5958415.54 N 615817.35 E 3,500 3419.92 Mb1
6300,00 53,015 101 .865 4568.69 4655.59 290.49 S 3788.62 E 5958411.10 N 615841.55 E 3.500 3443.30
6361,05 53,991 104.229 4605.00 4691 .90 301.57 S 3836.42 E 5958400.73 N 615889.51 E 3.500 3490.38 Mb2
25 April, 2002 - 8:36
Page 4 of 13
Drif/Quest 2.00. 09.006
Sperry-Sun Drilling Services
Proposal Report for W-203 WPS - W-203 Main OBd WP06
Revised: 23 April, 2002
BPXA
North Slope Alaska PBU_WOA W Pad
Q.1$1
Measured Sub-Sea Vertical Local Coordinates Global Coordinates ;'; Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft)[¡[4tft (0/100ft)
6400.00 54,639 105.706 4627,73 4714.63 309.748 3866.99 E 5958393.01 N615920.19"E 3.500 3521.02
6456.44 55,607 107.805 4660,00 4746.90 323.098 3911.32 E 5958380.32 N " 615964.72 E 3.500 3566.20 Mc
6500,00 56.379 109.391 4684.36 4771.26 334,61 8 3945.54 E 5958369.32 N ' 615999.11 E 3.500 3601.67
6600.00 58.224 112.926 4738.40 4825,30 365.00 8 4023,98 'E 5958340.10 N 616078.00 E 3.500 3684.93
6612,58 58.463 113,360 4745.00 4831.90 369,21 S 4033,83 E 5~5ag36.()4 N 616087,91 E 3.500 3695.58 Fault 2
6700,00 60.163 116.319 4789,62 4876,52 400.80 4102,03 E 5958305.47 N 616156.57 E 3,500 3770.50 ~
6741.48 60,992 117.687 4810,00 4896.90 411~.&.,. 4134.22 E 5958289.54 N 616189.01 E 3.500 3806.60 Nc
6800.00 62,185 119.580 4837,84 4924.74.:A~jf¡~g78 4179,39E 5958265,55N 616234.54E 3.500 3858.06
6900.00 64.281 122.720 4882.88 4969.78 488.07'8 255.77E 5958220.50N 616311.60E 3.500 3947.28
6940.07 65.140 123.946 4900.00 4986.90 507.978 286.04 E 5958201.05 N 616342.16 E 3.500 3983.42 OA
7000,00 66.442 125,749 4924.58 .5011.48 539,21 8 4330.89 E 5958170.49 N 616387.47 E 3.500 4037.84
7092.42 68.490 128.460 4960,00 5046.90590.71 8 4398.96 E 5958120.00 N 616456.29 E 3,500 4122.41 OBa
7100.00 68.660 128.679 4962.77 5049.67 595.11 8 4404.47 E 5958115.69 N 616461.87 E 3.500 4129.38
7200,00 70,927 131.521 ,,:4997.31, y;.:5084.2~p.' 655.568 4476.23 E 5958056.32 N 616534.53 E 3.500 4221.57
7208.26 71,116 131.752 50,00,O~~, 'i\:~86.9'Ö 660.758 4482,07 E 5958051.21 N 616540.44 E 3.500 4229.21 OBb
7300,00 73.236 134,285 5Ó28,08;/ 5114.98 720.338 4545.91 E 5957992.59 N 616605.16 E 3.500 4314.07
7342,55 74,230 135.441 5()4OfOÖ 5126,90 749.158 4574.85 E 5957964.21 N 616634.53 E 3,500 4353.43 OBc
7400.00 75.582 136.983 5054.96 5141,86 789.198 4613.24E 5957924.74N 616673.51 E 3.500 4406.53
7500.00 77,957 139.624 5077,85 5164.75 861.878 4677,97 E 5957853.04 N 616739,32 E 3.500 4498.61
7600.00 80,357 142.218 5096.66 5183.56 938.10 S 4739,87 E 5957777.73 N 616802.34 E 3.500 4589.96
7620.43 80.849 142,744 5100,00 5186.90 954.098 4752.14 E 5957761.93 N 616814.86 E 3.500 4608.50 OBd
7648,53 81.528 143.463 5104.30 5191.20 976.308 4768.81 E 5957739.97 N 616831.86 E 3,500 4633.93 Decrease in Dir Rate @ 3.017°r ~"ft :
7648.53ft MD, 5191 ,20ft TVD /
7700,00 83.081 143.430 5111.20 5198.10 1017.278 4799.19E 5957699.46N 616862.84E 3.017 4680.50 '-'
7750,00 84,589 143,397 5116.57 5203.47 1057.18 8 4828.82 E 5957659.99 N 616893,06 E 3.017 4725.91 7" Casing
7800,00 86,097 143.365 5120.63 5207.53 1097.188 4858.54 E 5957620.44 N 616923.38 E 3.017 4771.44
7900.00 89.113 143.300 5124.81 5211.71 1177.318 4918.20 E 5957541.21 N 616984.23 E 3.017 4862.75
7940.64 90,338 143,274 5125.00 5211.90 1209.898 4942.49 E 5957509.00 N 617009,00 E 3.017 4899.91 End Dir, 8tart Sail @ 90.338°:
7940.64ftMD,5211.90ftTVD
Target - W -203 OBd T1 a, Drillers
8000.00 90.338 143,274 5124.65 5211.55 1257.478 4977.99 E 5957461.95 N 617045.20 E 0.000 4954.19
8100.00 90,338 143.274 5124,06 5210.96 1337.62 S 5037.79 E 5957382.71 N 617106.19 E 0.000 5045.63
8200.00 90.338 143.274 5123.47 5210.37 1417.778 5097.59 E 5957303.46 N 617167.18 E 0.000 5137.07
25 April, 2002 - 8:36 Page 5 of 13 DriflQuest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for W-203 WPS - W-203 Main OBd WP06
Revised: 23 April, 2002
BPXA
North Slope Alaska PBU_WOA W Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings' Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft}¡J§'oIil\ (°/10 Oft)
8300.00 90,338 143,274 5122,88 5209.78 1497.92 S 5157.38 E 5957224.21 N 617228.16'E 0.000 5228.52
8400.00 90.338 143,274 5122.29 5209.19 1578.07 S 5217.18 E 5957144.96 N 617289.15 E 0.000 5319.96
8500,00 90.338 143.274 5121.70 5208.60 1658.21 S 5276.98 E 5957065.71 'N 617350.13 E 0.000 5411.40
8600.00 90.338 143,274 5121.11 5208.01 1738.36 S 5336.78' E 5956986.4é N 617411.12 E 0.000 5502.84
8700,00 90,338 143,274 5120.52 5207.42 1818.51 S 5396.57 E 5956907;21N 617472.10 E 0.000 5594.28
8800.00 90.338 143,274 5119,93 5206.83 1898.66,S 5456.37 E 5956827.96 N 617533.09 E 0.000 5685.73 ,.--.-/
8900,00 90.338 143,274 5119,34 5206.24 197.~~8f 5516.17 E' 5956748.71 N 617594.08 E 0.000 5777.17
9000.00 90,338 143,274 5118,75 5205.65 20S8t96 S 5575.97 E 5956669.46 N 617655.06 E 0.000 5868.61
9100.00 90.338 143.274 5118.16 5205.06 2139.11 S 635.76 E 5956590.22 N 617716.05 E 0.000 5960.05
9200,00 90.338 143,274 5117.57 5204.47 2219~26 S . 5695.56 E 5956510.97 N 617777.03 E 0.000 6051.49
9300,00 90.338 143,274 5116.98 5203.88 2299.41 S 5755.36 E 5956431.72 N 617838.02 E 0.000 6142.94
9400.00 90.338 143,274 5116.39 5203.29 2379.56 S 5815.16 E 5956352.47 N 617899.00 E 0.000 6234.38
9500,00 90,338 143.274 51,15.80 , , 5202.70 . 2459.71 S 5874.95 E 5956273,22 N 617959.99 E 0.000 6325.82
9600.00 90.338 143,274 '5~J5;21,\, 2'Ö2:11~J> 2539.86 S 5934.75 E 5956193.97 N 618020.97 E 0.000 6417.26
9700.00 90.338 143.274 ,~1, 14.6~;:'~i .52 2620.01 S 5994,55 E 5956114.72 N 618081.96 E 0.000 6508.70
9800,00 90,338 143,274 5114.03;> 5200.93 2700.16 S 6054.35 E 5956035.47 N 618142.95 E 0.000 6600.15
9900,00 90,338 143,274 51'1/3144 5200.34 2780.30 S 6114.14 E 5955956.22 N 618203.93 E 0.000 6691.59
10000,00 90.338 143,274 5112.85 5199.75 2860.45 S 6173.94 E 5955876.98 N 618264.92 E 0.000 6783.03
10100,00 90.338 143,274 5112,26 5199.16 2940.60 S 6233.74 E 5955797.73 N 618325.90 E 0.000 6874.47
10200.00 90,338 143,274 5111 .67 5198,57 3020.75 S 6293.53 E 5955718.48 N 618386.89 E 0.000 6965.91
10300,00 90,338 143,274 5111 ,08 5197.98 3100.90 S 6353.33 E 5955639.23 N 618447.87 E 0.000 7057.36
10400.00 90,338 143,274 5110.49 5197.39 3181.05 S 6413.13 E 5955559.98 N 618508.86 E 0.000 7148.80
10500.00 90.338 143,274 5109,90 5196.80 3261.20 S 6472.93 E 5955480.73 N 618569.85 E 0.000 7240.24
10600.00 90,338 143.274 5109.31 5196.21 3341.35 S 6532.72 E 5955401.48 N 618630.83 E 0.000 7331.68 -"_/
1 0700,00 90.338 143,274 5108.72 5195.62 3421.50 S 6592.52 E 5955322.23 N 618691.82 E 0.000 7423.12
10800,00 90.338 143,274 5108.13 5195.03 3501,65 S 6652.32 E 5955242.98 N 618752.80 E 0.000 7514.57
10900,00 90,338 143,274 5107.54 5194.44 3581.80 S 6712.12 E 5955163.73 N 618813.79 E 0.000 7606.01
11000.00 90,338 143,274 5106.95 5193.85 3661.95 S 6771 .91 E 5955084.49 N 618874.77 E 0.000 7697.45
11100,00 90.338 143.274 5106.36 5193.26 3742.10 S 6831.71 E 5955005,24 N 618935.76 E 0,000 7788.89
11200.00 90,338 143,274 5105,77 5192.67 3822,25 S 6891.51 E 5954925,99 N 618996.75 E 0.000 7880.33
25 April, 2002 - 8:36
Page 6 of 13
DrillQuest 2.00.09.006
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings
(ft) (ft) (ft) (ft) (ft)
11300,00 90.338 143.274 5105.18 5192.08 3902.40 S 6951.31 E
11329,95 90,338 143,274 5105,00 5191.90 3926.40 S 6969.22 E
Sperry-Sun Drilling Services
Proposal Report for W-203 WPS - W-203 Main OBd WP06
Revised: 23 April, 2002
Global Coordinates,
Northings Eastings
(ft) (ft)
5954846.74 N
5954823.00 N
619057.73 E
619076.00 E
All data is in Feet (US) unless otherwise stated, Directions and coordinates are
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Magnetic Declination at Surface is 26,142° (22-Apr-02)
The Dogleg Severity is in Degrees per 100 feet (US),
Vertical Section is from Well and calculated along an
North.
Based upon Minimum Curvature type
The Bottom Hole Displacement is
119.400° (True).
~tlih of 11329.95ft.,
.9:'397° (True).
Comments
Measured
Depth
(ft)
0.00
303.90
503,90
653.90
1845,29
2091.84
2473.53
3995.90
6136,13
7648,53
25 April, 2002 - 8:36
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
0,00
303,90
503.81
653,33
1753.90
1953,90
2231.40
3196.90
4554.25
5191,20
0.00 N
O.OON
0.00 N
O.OON
0.00 N
0.00 E
0.00 E
5.23 E
17.00 E
437.10 E
0.00 N
13.51 S
120.64 S
271.25 S
976.30 S
581.27 E
841.35 E
2013.50 E
3661.38 E
4768.81 E
Com ment
Begin 12-1/4" Hole Size
Begin Dir @ 1.5000/100ft: 303.9Oft MD, 303.9Oft TVD
Increase in Dir Rate @ 2.0000/100ft : 503.90ft MD, 503.81ft TVD
Increase in Dir Rate @ 2.5000/100ft : 653.90ft MD, 653.33ft TVD
End Dir, Start Sail @ 35.785° : 1845.29ftMD,1753.90ftTVD
Begin Dir @ 4.0000/100ft : 2091.84ft MD, 1953.9Oft TVD
End Dir, Start Sail @50.639° : 2473.53ftMD,2231.40ftTVD
Begin 8-3/4 n Hole Size
Begin Dir @ 3.500°/1 0 Oft : 6136.13ft MD, 4554.25ft TVD
Decrease in Dir Rate @ 3.017°/10Oft: 7648.53ft MD, 5191.20ft TVD
Page 7 of 13
'#
BPXA
PBU_WOA W Pad
Dogleg
Rate
(o/100ft)
Vertical
Section
Comment
0.000 7971.78
0.000 7999.17 Total Depth:
11329.95ftMD,5191.9OftTVD
4 1/2" Liner
Target - W-203 OBd T2a, Drillers
~
~.
Dril/Quest 2.00.09.006
"". ".~. ."'" ,".. .
H 206302
DATE
03/14/02
CHECK NO,
00206:302
DATE
INVOICE I CREDIT MEMO
DESCRIPTION
GROSS
100- 00
VENDOR
DISCOUNT
ALASKAOILA
NET
00
031202 CK031202L
PYMT COMMENTS:
HANDL: NG I NST:
Pernit To Drill Fee
S/H - Terrie Hubble
100. 00 H
X4628
Lù 'AGO
RECE'VED
A\ DP '\ () 21)f¡?
¡ !\ vU V lit..
Alaska Oil & Gas Oems. GommtSSlOi
AnchoraQe
'-
THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
TOTAL ~
100.001
iOO. 00
BP EXPLORATION, (ALASKA) INC.
P.O, BOX 196612
ANCHORAGE, ALASKA 99519-6612
FIRST NATIONAL BANK OF ASHLAND
AN AFFlUATE OF
NATIONAL CITY BANK
CLEVELAND, OHIO
No. H 208302
CONSOLIDATED COMMERCIAL ACCOUNT
56-389
412
00206302
PAY
ONE HUNDRED & 00/100************************************* US DOLLAR
DATE
03i14/02
AMOUNT
$100. 00
To The
ORDER
Of
ÄLÄSKA OIL AND GAS
CONSERVATION COMMISSION
333 WEST 7TH AVENUE
SUITE 100
ANCHORAGE
NOT VALID AFTER 120 DAYS
~
AK 99501
'\~ 6 ,"~, ~ ¡. l~'
" 1; ,'1. ;-'ff
\ c.JJ - ~ '-~ ,,¡, ,
-,-.s
III 20 b :10 2111 .:0.... 20 :18 g 51: 008....... gill
CHECK 1
ST ANDARD LEITER
DEVELOPMENT
-/
DEVELOPMENT
REDRILL
EXPLORA TI0N
INJECTION WELL
INJECTION WELL
RED RILL
)
')
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERlPARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LEITER
WELL NAME f6(J Wr2/)3
CHECK WHAT APPLIES
ADD-ONS (OPTIONS)
MULTI LATERAL
(If api number last two (2)
digits are between 60-69)
Pß..,OT HOLE (PH)
ANNULAR ~SAL
VNO
ANNULAR DISPOSAL
L-) YES
ANNULAR DISPOSAL
THIS WELL
"CLUE"
Tbe permit is for a new wellbore segment of existing weD
~ Permit No, . API No. . '
Production sbould continue to be reported as a function of
the original API number stated above. '
In accordance with 2,0 MC 25.005(f), all rei:ords, data and
logs acquired for tbe pilot hole must be clearly
differentiated in both name (name on permit plus PH)
and API number (50 -70/80) from
, records, data and logs acquired for well (name on permit).
Annular disposal has ~ot been requested. . .
Annular Disposal, of drilling wastes will not be approved. . .
Annular Disposal' of drilling wastes will not be approved. . .
DISPOSAL INTO OTHER Please note tbat an disposal of fluids generated.,.
ANNULUS
LJ YES +
SP ACING EXCEPTION
Templates are located m drive\jody\templates
Enclosed is the approved application for permit to drill tbe
above referenced well. Tbe permit is approved .sùbject to
full compliance with 20 AAC 25.055. Approval to perforate
and produce is contingent upon issuan'ce of a conservation
order approving 8 spacing exception.
(Company Name) will assume the liability of any protest to
the spacing exception tbat may occur.
WELL PERMIT CHECKLIST COMPANY ,A"¡?k WELL NAME 1t5/L vv- Zð.3 PROGRAM: Exp - Dev --ÝRedrll - Serv - Wellbore seg - Ann. disposal para req-
FIELD & POOL 0,/,0/0 INITCLASS ~v /O/L. GEOLAREA ßiò UNIT# O//h,Ç{) ON/OFFSHORE()þ1...
ADMINISTRATION 21. PLermit fee abttached. . .a' t. "* . ¿:.^. 'dc&(¡':':-:'A ~ . /D"-Si>/ ~.k~ jL~ ?cl"-A -h~ ~ ..?o 4't?'"rr:)Lc-I-z~ . /. ~ ~
. ease num er appropn e. . ~ . . . . . . ~ "=''"-'',/ . . . 0, . iftf;# iA1., ~
3. Unique well ~ame and number. ., . . -' . . . . . . . . . . . . N rf1/U crZ-ß, Z ~ 3 ,) tu-éÝI b~ H!- uc... -h ~ ~ -.þ..., v ~ ( ¿:¡<1 S $L- ~ -/£1" tA-
4. Well located In a defined pool. ~~. . . . . . . . . . . . . y(Ñ) 6~ Coo-r-ÿ\J..r-- ø~ /I.D J- D 7'15/ ~ I-e-O-Lks Í"T, þ, vr-.
5. Well located proper distance from drilling unit boundary. . . . ét)N /9 DC- ð z.?r OZfP ~ . b /
6. Well located proper distance from other wells.. . . . . . . . . N ~ -ri'. fl J . /;J -; . ~ -I~ ../ - ~ ~ I) /~
7. Sufficient acreage available in drilling unit.. . . . . . . . . . . N (1o(..L (~ (4.-+-1 S {or:y l<} (...) r~ 0 t-£~d1.-~.
8. If deviated, is well bore plat included.. . . . . . . . . . . . . . N
9. Operator only affected party.. . . . . . . . . . . . . . . . . . N
10. Operator has appropriate bond in force. . . . . . . . . . . . . ' N
11. Permit can be issued without conservation order. . . . . . . . N
A~,*"" DA:r~ 12. Permit ca~ be issued without administrativ~ approval.. . . . .
)'Jl./ 5 (. 6 W3. Can permit be approved before 15-day walt.. . . . . . . . . . Y
ENGINEERING 14. Conductor string provided. . . . . . . . . . . . . . . . . . . 62 N W" K ~ 4- 1/ @ ilL/- I ,
15. Surface casing protects all known USDWs. . . . . . . . . . . 1YJ N Á' .J.
16. CMT vol adequate to circulate on conductor & surf csg. . . . . ~ N f-t'de -J.. L{""': ,(-.-( e.--,tCRÇ ç .
17. CMT vol adequate to tie-in long string to surf csg. . . . . . . . Y @ U
18. CMT will cover all known productive horizons. . . . . . . . . . &.. N
19. Casing designs adequate for C, T, B & permafrost. . . . . . . 2SV N
20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . Q N DI$W1 ~ ,'-I
21. If a re-drill, has a 10-403 for abandonment been approved. . . .¥-N Ail* I
22. Adequate well bore separation proposed.. . . . . . . . . . . . fi2 N Alo c.k t-Q IJ.-f::>{) Y6I &<-l.~ S. '
23. If diverter required, does it meet regulations. . . . . . . . . . ~~' N
24. Drilling fluid program schematic & equip list adequate. . . . . ' N
25. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . N . ,
APPR DA1E 26. BOPE press rating appropriate; test to 35'00 psig. 1h N JIlt; V = / (¡,q</.- P ~ { .
\.&J4Ä- sl t( 02.. 27. Choke manifold complies w/API RP-53 (May 84). . . . . . . . ex N
28. Work will occur without 0, peration shutdown. . . . . . . . . . . (2" ~ .
29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . Y (bIJ
30. Permit can be issued w/o hydrogen sulfide measures. . . . . cJ2 ,N 1') / /Î
31. Data presented on potential overpressure zones . . . . . .. +f~N ~~~, ~r-<-~" .~
32. Seismic analysis of shallow gas zones. . . . . . . . . . . . .~.¡J.('t. Y N {j
A~ DATE 33. Seabed condition survey (if off-shore). . . . . . . . . ~ Y N
P )..; 5'. (. {/1.--- 34. Contact name/phone for weekly progress reports Eætßíoratory only] Y N
ANNULAR DISPOSAL 35. With proper cementing records, this plan
(A) will contain waste in a suitable receiving zone; . . . . . . .
(B) will not contaminate freshwater; or cause drilling waste. .,
to surface;
(C) will not impair mechanical integrity of the well used for disposal; Y N
(D) will not damage producing formation or impair recovery from a Y N
pool; and
(E) will not circumvent 20 MC 25.252 or 20 AAC 25,412. Y N
GEOLOGY: ENGINEERING: UIC/Annular: COMMISSION:
(
GEOLOGY
(
APPR DATE
Y N
Y N
,JA V'€ ô iÅ-P S:t ¿ .
Commentsllnstructions:
RPC
SFD /51:>
TEM
WGA~-
COT
DTS Õj/Of (0 ~
JMH
')
Well H ¡story File
APPENDIX
Information of detailed nature that is not
particularly gennane to the Well Pennitting Process
but is part of the history file. ,
To improve the readabiHty of the Well History file and to
simplify finding information, infonnation of this
nature is accumulated at the end of the file under APPEN.DIX.
No special effort has been made to chronologically
organize this category of information.
)
Sperry-Sun Drilling Services
LIS Scan utility
$Revision: 3 $
LisLib $Revision: 4 $
Mon Aug 12 12:16:12 2002
Reel Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .02/08/12
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number.... ..01
Previous Reel Name..... ..UNKNOWN
C omme n t s . . . . . . . . . . . . . . . . . S T S LIS
)
Writing Library. Scientific Technical Services
Tape Header
Service name............ .LISTPE
Date.................... .02/08/12
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments................ .STS LIS
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay Unit
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
#
REMARKS:
Writing Library. Scientific Technical Services
MWD RUN 1
AK-MW-22078
C.A. DEMOSKI
S. KOLSTAD
MWD RUN 4
AK-MW-22078
C.A. DEMOSKI
A. MADSEN
MSL 0)
W-203
500292308700
BP Exploration
Sperry Sun
12-AUG-02
MWD RUN 2
AK-MW-22078
C.A. DEMOSKI
A. MADSEN
21
11N
12E
3668
1197
.00
87.14
52.90
(Alaska), Inc.
MWD RUN 3
AK-MW-22078
C.A. DEMOSKI
A. MADSEN
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
12.250 9.625 4065.0
8.750 7.000 7781.0
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
dOè).-o97
/ 0 ~ ~b
)
STATED.
2. MWD RUNS 1 & 2 ARE DIRECTIONAL WITH DUAL GAMMA RAY
(DGR) UTILIZING
GEIGER MUELLER TUBE DETECTORS,
3. MWD RUN 3 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR)
UTILIZING GEIGER
MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE
RESISTIVITY PHASE 4
(EWR4), COMPENSATED NEUTRON POROSITY (CNP) , AND
STABILIZED LITHO-DENSITY (SLD).
4. MWD RUN 4 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR)
UTILIZING GEIGER
MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE
RESISTIVITY PHASE 4
(EWR4), COMPENSATED THERMAL NEUTRON POROSITY (CTN) ,
AND
STABILIZED LITHO-DENSITY (SLD).
5. GAMMA RAY (SGRC) IS LOGGED BEHIND CASING FROM 4020'
MD, 3175' TVD TO
4065' MD, 3204' TVD.
6. GAMMA RAY (SGRC) IS LOGGED BEHIND CASING FROM 7754'
MD, 5199' TVD TO
7781' MD, 5203' TVD. ELECTROMAGNETIC WAVE
RESISTIVITY PHASE 4 (EWR4)
IS LOGGED BEHIND CASING FROM 7746' MD, 5198' TVD
TO 7781' MD, 5203' TVD.
7. COMPENSATED THERMAL NEUTRON POROSITY (CTN) IS LOGGED
BEHIND CASING
FROM 7701' MD, 5192' TVD TO 7781' MD, 5203' TVD.
THE GAP IN STABILIZED LITHO-DENSITY (SLD) DATA
FROM 7711' MD, 5193' TVD
TO 7782' MD, 5203' TVD IS DUE TO LOGGING BEHIND
CASING.
8. DEPTH SHIFTING / CORRECTION WAIVED PER THE EMAIL
FROM
D. SCHNORR OF 06/04/02. MWD CONSIDERED PDC.
ALL MWD LOG HEADER DATA RETAINS THE ORIGINAL
DRILLER'S DEPTH REFERENCES.
9. MWD RUNS 1 - 4 REPRESENT WELL W-203 WITH
API # 50-029-23087-00. THIS WELL REACHED A TOTAL
DEPTH OF
11320' MD, 5214' TVD.
SROP = SMOOTHED RATE OF PENETRATION
SGRC = SMOOTHED GAMMA RAY COMBINED
SEXP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
EXTRA SHALLOW SPACING)
SESP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
SHALLOW SPACING)
SEMP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
MEDIUM SPACING)
SEDP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
DEEP SPACING)
SFXE = SMOOTHED FORMATION EXPOSURE TIME
SBD2 = SMOOTHED BULK DENSITY (LOW-COUNT BIN)
SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT
BIN)
SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR
(LOW-COUNT BIN)
TNPS = SMOOTHED THERMAL NEUTRON POROSITY
(SANDSTONE MATRIX,
FIXED HOLE SIZE)
SPSF = SMOOTHED COMPENSATED NEUTRON POROSITY
(SANDSTONE MATRIX, FIXED HOLE SIZE)
SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT
CTFA =
RATE
CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT
)
RATE
SNFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT
RATE
SNNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT
RATE
ENVIRONMENTAL PARAMETERS USED IN PROCESSING THE
NEUTRON LOG DATA:
HOLE SIZE:
8.75 / 6.125"
MUD WEIGHT:
9.3 PPG
MUD FILTRATE SALINITY:
CHLORIDES
FORMATION WATER SALINITY:
FLUID DENSITY:
G/CC
MATRIX DENSITY:
LITHOLOGY:
SANDSTONE
$
File Header
Service name........... ..STSLIB.OOl
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/08/12
Maximum Physical Record..65535
File Type............... .LO
Previous File Name...... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
RPX
RPS
RPM
RPD
FET
NPHI
FCNT
NCNT
DRHO
RHOB
PEF
$
1
9.0 -
400 - 18500 PPM
20000 PPM CHLORIDES
1. 00
2.65 G/CC
clipped curves; all bit runs merged.
.5000
START DEPTH
57.0
114.5
4055.0
4055.0
4055.0
4055.0
4055.0
4055.0
4055.0
4055.0
4065.5
4065.5
4065.5
STOP DEPTH
11265.0
11320.0
11272.0
11272.0
11272.0
11272.0
11272.0
11230.0
11230.0
11230.0
11244.5
11244.5
11244.5
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED
PBU
MWD
MWD
MWD
MWD
$
DATA SOURCE
TOOL CODE
BIT RUN NO MERGE TOP
1 57.0
2 1302.5
3 4078.5
4 7791.5
MERGE BASE
1302.0
4078.0
7791.0
11320.0
#
REMARKS:
MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type....... ...... .....0
)
)
Data Specification Block Type... ..0
Logging Direction.. ..... ......... . Down
Optical log depth units. ......... .Feet
Data Reference Point.... ......... .Undefined
Frame Spacing........... ......... .60 .1IN
Max frames per record... ... ...... .Undefined
Absent value..................... .-999
Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HR 4 1 68 28 8
NPHI MWD PU-S 4 1 68 32 9
FCNT MWD CP30 4 1 68 36 10
NCNT MWD CP30 4 1 68 40 11
RHOB MWD G/CM 4 1 68 44 12
DRHO MWD G/CM 4 1 68 48 13
PEF MWD B/E 4 1 68 52 14
First Last
Name 8ervice unit Min Max Mean Nsam Reading Reading
DEPT FT 57 11320 5688.5 22527 57 11320
ROP MWD FT/H 0.27 843.9 209.004 22412 114.5 11320
GR MWD API 11. 41 128.27 64.7815 22417 57 11265
RPX MWD OHMM 0.21 1660.63 8.75955 14435 4055 11272
RPS MWD OHMM 0.57 1660.72 9.25444 14435 4055 11272
RPM MWD OHMM 0.39 2000 13.6775 14435 4055 11272
RPD MWD OHMM 0.51 2000 16.601 14435 4055 11272
FET MWD HR 0.09 75.47 1.13149 14435 4055 11272
NPHI MWD PU-8 9.68 71.01 37.8144 14351 4055 11230
FCNT MWD CP30 119.93 1283 411.71 14351 4055 11230
NCNT MWD CP30 2008 31715 11885.7 14351 4055 11230
RHOB MWD G/CM 1. 37 3.08 2.23179 14217 4065.5 11244.5
DRHO MWD G/CM -0.25 0.97 0.0864929 14217 4065.5 11244.5
PEF MWD B/E 0.37 9.43 1.88626 14217 4065.5 11244.5
First Reading For Entire File... '.".' .57
Last Reading For Entire File... ....... .11320
File Trailer
8ervice name............ .8TSLIB.001
Service Sub Level Name...
Version Number.... ...... .1.0.0
Date of Generation...... .02/08/12
Maximum Physical Record. .65535
File Type............... .LO
Next File Name......... ..8T8LIB.002
Physical EOF
File Header
Service name...... ..... ..STSLIB.002
8ervice Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/08/12
Maximum Physical Record. .65535
File Type......... ...... .LO
Previous File Name...... .8T8LIB.001
Comment Record
FI LE HEADER
FILE NUMBER:
RAW MWD
2
)
header data for each bit run in separate files.
1
.5000
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
START DEPTH
57.0
114.5
STOP DEPTH
1244.0
1302.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type............... ...0
Data Specification Block Type.....O
Logging Direction.... .......... ...Down
Optical log depth units........ ...Feet
Data Reference Point......... .... .Undefined
Frame Spacing......... ...... ... ...60 .1IN
Max frames per record.......... ...Undefined
Absent value............ ......... .-999
Depth Units.......................
Datum Specification Block sub-type. ..0
25-MAY-02
Insite 4.05.5
66.37
Memory
1302.0
.0
17.4
TOOL NUMBER
PBOO188HWRGV6
12.250
Spud Mud
8.70
320.0
9.5
200
11. 4
.000
.000
.000
.000
.0
72 .0
.0
.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWDOIO FT/H 4 1 68 4 2
GR MWDOIO API 4 1 68 8 3
)
)
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 57 1302 679.5 2491 57 1302
ROP MWD010 FT/H 0.27 230.53 85.8046 2376 114.5 1302
GR MWD010 API 18.15 100.88 42.8461 2375 57 1244
First Reading For Entire File.... ..... .57
Last Reading For Entire File..... ..... .1302
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/08/12
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation..... ..02/08/12
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
3
header data for each bit run in separate files.
2
.5000
START DEPTH
1244.5
1302.5
STOP DEPTH
4020.5
4078.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
27-MAY-02
Insite 4.05.5
66.37
Memory
4078.0
19.0
55.4
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
TOOL NUMBER
PBOO188HWRGV6
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
12.250
4065.0
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
Spud Mud
9.30
260.0
9.4
200
)
)
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
8.8
.000
.000
.000
.000
.0
84.2
.0
.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type......... ....... ..0
Data Specification Block Type... ..0
Logging Direction....... ........ ..Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing.... ......... ....... .60 .1IN
Max frames per record.... ........ .Undefined
Absent value.................... ..-999
Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 1244.5 4078 2661. 25 5668 1244.5 4078
ROP MWD020 FT/H 2.47 843.9 211. 52 5552 1302.5 4078
GR MWD020 API 21. 9 106.37 66.0473 5553 1244.5 4020.5
First Reading For Entire File......... .1244.5
Last Reading For Entire File.......... .4078
File Trailer
Service name...... ...... .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/08/12
Maximum Physical Record. .65535
File Type........ ....... .LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name..... ....... .STSLIB.004
Service Sub Level Name...
Version Number. ... ...... .1.0.0
Date of Generation...... .02/08/12
Maximum Physical Record. .65535
File Type......... ...... .LO
Previous File Name...... .STSLIB.003
Conunent Record
FILE HEADER
FI LE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
4
header data for each bit run in separate files.
3
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
RPS
RPM
NCNT
FCNT
NPHI
FET
RPX
RPD
PEF
DRHO
RHOB
ROP
$
.5000
START DEPTH
4021.0
4055.0
4055.0
4055.0
4055.0
4055.0
4055.0
4055.0
4055.0
4065.5
4065.5
4065.5
4078.5
STOP DEPTH
7754.0
7746.5
7746.5
7701.5
7701.5
7701.5
7746.5
7746.5
7746.5
7711. 0
7711. 0
7711. 0
7791.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
CNP
SLD
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
COMPENSATED NEUTRON
STABILIZED LITHO DEN
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type................ ..0
Data Specification Block Type.. ...0
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point.. ...... ... ...Undefined
Frame Spacing... ........ ....,.... .60 .1IN
)
30-MAY-02
Insite 4.05.5
66.37
Memory
7791.0
48.9
82.2
TOOL NUMBER
PBOO188HWRGV6
PBOO188HWRGV6
PBOO164NL6
PBOO164NL6
8.750
7781.0
LSND
9.20
56.0
8.6
200
7.4
5.400
3.645
5.000
5.200
68.0
104.0
68.0
68.0
)
Max frames per record........ .... .Undefined
Absent value............... ...... .-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HR 4 1 68 28 8
NPHI MWD030 PU-S 4 1 68 32 9
FCNT MWD030 CP30 4 1 68 36 10
NCNT MWD030 CP30 4 1 68 40 11
RHOB MWD030 G/CM 4 1 68 44 12
DRHO MWD030 G/CM 4 1 68 48 13
PEF MWD030 B/E 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 4021 7791 5906 7541 4021 7791
ROP MWD030 FT/H 2.8 840.72 263.13 7426 4078.5 7791
GR MWD030 API 11.41 128.27 67.3113 7467 4021 7754
RPX MWD030 OHMM 0.21 65.81 7.40106 7384 4055 7746.5
RPS MWD030 OHMM 1. 23 63.85 7.47452 7384 4055 7746.5
RPM MWD030 OHMM 1. 85 2000 8.94725 7384 4055 7746.5
RPD MWD030 OHMM 0.51 2000 10.0065 7384 4055 7746.5
FET MWD030 HR 0.09 51. 32 0.772538 7384 4055 7746.5
NPHI MWD030 PU-S 9.68 71. 01 40.1586 7294 4055 7701. 5
FCNT MWD030 CP30 402 1283 535.487 7294 4055 7701.5
NCNT MWD030 CP30 2008 4082.89 2727.62 7294 4055 7701.5
RHOB MWD030 G/CM 1. 37 3.08 2.23757 7292 4065.5 7711
DRHO MWD030 G/CM -0.11 0.97 0.110274 7292 4065.5 7711
PEF MWD030 B/E 0.37 6 1. 82128 7292 4065.5 7711
First Reading For Entire File......... .4021
Last Reading For Entire File.. ........ .7791
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/08/12
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Service name....... ..... .STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation..... ..02/08/12
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.004
Corrunent Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
5
header data for each bit run in separate files.
4
.5000
)
VENDOR
NPHI
FCNT
NCNT
RPS
RPX
RPM
RPD
FET
GR
PEF
RHOB
DRHO
ROP
$
START DEPTH
7702.0
7702.0
7702.0
7747.0
7747.0
7747.0
7747.0
7747.0
7754.5
7782.5
7782.5
7782.5
7791.5
STOP DEPTH
11230.0
11230.0
11230.0
11272.0
11272.0
11272.0
11272.0
11272.0
11265.0
11244.5
11244.5
11244.5
11320.0
TOOL CODE
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
CTN
SLD
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
COMP THERMAL NEUTRON
STABILIZED LITHO DEN
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units... ... ... ..Feet
Data Reference Point..... ........ .Undefined
Frame Spacing.................... .60 .1IN
Max frames per record.... ...... ...Undefined
Absent value.............. ....... .-999
Depth Units.......................
)
04-JUN-02
Insite 4.05.5
66.37
Memory
11320.0
82.8
92.3
TOOL NUMBER
PB00206HAGR4
PB00206HAGR4
PBOO0201NL4
PBOO0201NL4
6.125
Baradril-N
9.15
49.0
9.5
18500
4.1
.180
105.800
.320
.200
68.0
104.0
68.0
68.0
)
)
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FT/H 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
RPX MWD040 OHMM 4 1 68 12 4
RPS MWD040' OHMM 4 1 68 16 5
RPM MWD040 OHMM 4 1 68 20 6
RPD MWD040 OHMM 4 1 68 24 7
FET MWD040 HR 4 1 68 28 8
NPHI MWD040 PU-S 4 1 68 32 9
FCNT MWD040 CP30 4 1 68 36 10
NCNT MWD040 CP30 4 1 68 40 11
RHOB MWD040 G/CM 4 1 68 44 12
DRHO MWD040 G/CM 4 1 68 48 13
PEF MWD040 B/E 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 7702 11320 9511 7237 7702 11320
ROP MWD040 FT/H 2.35 583.67 191.55 7058 7791.5 11320
GR MWD040 API 29.97 97.48 68.5094 7022 7754.5 11265
RPX MWD040 OHMM 0.47 1660.63 10.1822 7051 7747 11272
RPS MWD040 OHMM 0.57 1660.72 11.1184 7051 7747 11272
RPM MWD040 OHMM 0.39 2000 18.6312 7051 7747 11272
RPD MWD040 OHMM 0.88 2000 23.5069 7051 7747 11272
FET MWD040 HR 0.19 75.47 1. 50739 7051 7747 11272
NPHI MWD040 PU-S 23.95 49.41 35.3913 7057 7702 11230
FCNT MWD040 CP30 119.93 596.56 283.777 7057 7702 11230
NCNT MWD040 CP30 5074.76 31715 21351. 3 7057 7702 11230
RHOB MWD040 G/CM 1. 98 2.72 2.2257 6925 7782.5 11244.5
DRHO MWD040 G/CM -0.25 0.49 0.0614513 6925 7782.5 11244.5
PEF MWD040 B/E 0.84 9.43 1. 9547 6925 7782.5 11244.5
First Reading For Entire File......... .7702
Last Reading For Entire File.......... .11320
File Trailer
Service name.... ........ .STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/08/12
Maximum Physical Record. .65535
File Type....... ........ .LO
Next File Name.. ........ .STSLIB.006
Physical EOF
Tape Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .02/08/12
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Next Tape Name.. ........ . UNKNOWN
Comments. . . . . . . . . . . . . . . . . STS LIS
Writing Library.
Scientific Technical Services
Reel Trailer
Service name.... ....... ..LISTPE
Date. . . . . . . . . . . . . . . . . . . . .02/08/12
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name....... ....... ..UNKNOWN
Continuation Number.... ..01
Next Reel Name.......... . UNKNOWN
C omme n t s . . . . . . . . . . . . . . . . . S T S LIS
Writing Library.
Scientific Technical Services
Physical EOF
"'
)
Physical EOF
End Of LIS File