Imag ~roject Well History File Cover i 1ge
XHVZE
Th is page identifies those items that were not scanned during the initial production scanning
phase. They are available in the original file, may be scanned during a special rescan activity or
are viewable by direct inspection of the file.
é1. {J~ - Oç¡c¡
Well History File Identifier
Organizing (dolle)
RES CAN
0 Two~Sided
0 Rescan Needed
OVERSIZED (Scannable)
DIGITAL DATA
~ Diskettes, NO.~
0
Maps:
Other items scannable by
large scanner
0
Color items:
0
Grayscale items:
Other, Noffype
0
0
0
Poor Quality Originals:
Other:
OVERSIZED (Non-Scannable)
0
0
Logs of various kinds
NOTES:
BY:
BEVERLY ROBIN VINCENT SHERY~INDY
~ -- :-;.--
Other
OATE:7Þ7 OlfSI
1111:0
0
Project Proofing
BY:
BEVERLY ROBIN VINCENT SHERY~WINDY
~
DATE:,-J ;)..7 °'r'
V\1jO
Scanning Preparation
l x 30 = 3D
+ ~ = TOTAL PAGES (9
DATE 1 !FJ, ~SI VV ,0
, .
BY:
BEVERLY ROBIN VINCENT SHER~INDY
Stage 1
{po (þ;~ p~~
PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION.: .L YES - NO
DATEfÕ ðJ O,+/SI yV1(')
Production Scanning
PAGE COUNT FROM SCANNED FILE:
BY:
BEVERLY ROBIN VINCENT SHER~ WINDY
'-
Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND:
- YES - NO
BY:
BEVERL Y ROBIN VINCENT SHERYL MARIA WINDY
DATE:
Isl
(SCANNING IS COMPLETE AT THIS POINT UNLESS SPECiAl ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS
DUE TO QUALITY, GRAYSCALE OR COLOR IMAGES)
ReScanned (j/)('/ivid{/;.If pJg'" k,p!~d,l/.1ft()ifioIJ !,(';,:;lJning I:Ompfnfcd)
RESCANNED Bt: BEVERLY ROBIN VINCENT SHERYL MARIA WINDY
DATE:
Isl
General Notes or Comments about this file:
Quality Checked (d('IIí;\
12/10/02Rev3NOTScanned.wpd
(r'
F:\LaserFicbe\CvrPgs _ Inserts\Microfilm _ Marker. doc
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
'":!"-
f ~-.) J'.~ À-..() ~ '~
DATA SUBMITTAL COMPLIANCE REPORT
7/6/2004
5/ttGJ (/ J J.wí. ~ Lf
API No. 50-029-23087-61-00
Well Name/No. PRUDHOE BAY UN POL W-203L2
Operator BP EXPLORATION (ALASKA) INC
Permit to Drill 2020990
MD 11340
- ~-------- ----
----------
......,/
. ...----
NO 5086'- Completion Date 6/15/2002 Completion Status 1-01L
UIC N
Current Status 1 ~OIL
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey Yes------
--- .------ ---
DATA INFORMATION
Types Electric or Other Logs Run:
Well Log Information:
(data taken from Logs Portion of Master Well Data Maint)
Log/
Data Digital
Type Med/Frmt
~-D---
~
~
~
~' C
~-D
'--;Ë D 0
-- --- -_..~- --- ----
Electr
Dataset
Number Name
v'"Directional$urvey
Directional Survey
Log Log Run Interval OH/ ~.
Scale Media No Start Stop CH Received Comments
1 7079 11340 Open 7/17/2002
7079 11340 Open 7/17/2002 MWD
57 11281 Open 8/23/2002
7079 11340 Open 7/17/2002
57 11340 Case 11/7/2002 Digital Data: Rate of
Penetration, Dual Gamma
Ray, Electromagnetic
Wave Resistivity
7079 11340 Open 7/17/2002 MWD
57 11281 Open 8/23/2002
LIS Verification
Directional Survey
C~~(270 See Notes
/---r5ir;ctionaISurvey
~87L1S Verification
Well Cores/Samples Information:
Name
Interval
Start Stop
Sample
Set
Number Comments
Sent
Received
~-~-
Well Cored?
ADDITIONAL INFORMATION
Yf@
Daily History Received?
Y/N
(j/N
Chips Received? ~ Y / N
Analysis
Received?
- - ---"- -- -
- -.---- -
Comments:
Formation Tops
-X-t-N -~
- -- ...nm)-
DATA SUBMITTAL COMPLIANCE REPORT
7/6/2004
Permit to Drill 2020990
Well Name/No. PRUDHOE BAY UN POL W-203L2
Operator BP EXPLORATION (ALASKA) INC
API No. 50-029-23087-61-00
MD 11340
TVD 5086
Co llpletion Date 6/15/2002
Completion Status 1-01L
Current Status 1-01L UIC N
Date: Å (¡¿ J ~ M-H
---------------~
~
Compliance Reviewed By:
~~-'
'~
')
)
~oa-'099
{/~-¡O
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
October 25,2002
RE: MWD Fonnation Evaluation Logs: W-203 L2 POLARIS, AK-MW-22078
W-203 L2 Polaris:
Digital Log Images:
50-029-23087-61
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Speny-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd,
Anchorage, Alaska 99508
Date:
SimË~>~\(~~
RECEIVED
Nav 072002
Alaska Oii & Gas Cons. CommìSlion
Anchorage .
)
)
aod~oc¡ 1
I09~7
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
J\nchorage, Alaska
August 15, 2002
RE: MWD Fonnation Evaluation Logs W -203 L2,
AK-MW-22078
1 LDWG fonnatted Disc with verification listing.
API#: 50-029-23087-61
PLEASE ACKNOWLEDG~ RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Speny-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
Signed: ~ ~FJ
RECEIVED
A.! 1"
v'v ? "':- 2
'-~! 002
AI.sOiI & Gas f'A-
.4n.1. "'WIS. Comthã&-t-
. V~lorBge - ""'UO\JlOn
)
)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well
181 Oil 0 Gas 0 Suspended 0 Abandoned 0 Service . ."",~"".I._..""'~:
2. Name of Operator ~1t.K:A~1ON)~; \
BP Exploration (Alaska) Inc. ~, .~ " ",~,
3. Address ~z%');.~
P.O. Box 196612, Anchorage, Alaska 99519-6612 ..'. t~B.'!/ii.{!:jJ
4. Location of well at surface I COMPLETiON I
3668' NSL, 1197' WEL, SEC. 21, T11N, R12E, UM ',' DATE ,
At top of productive interval : t.; 1/'5:. Q.Z-.
3064' NSL, 3208' EWL, SEC. 22, T11N, R12E, UM (OBa)'l,,' ,'.',;¿.ER ,lED, ~
At total depth '. ~.. -.. '(þ, ",. i:
227' SNL, 500' EWL, SEC. 26, T11 N, R12E, UM - .,.,,,,..,.,...,.,..~
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No.
KBE = 87.14' ADL 028264
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband.
6/11/2002 6/13/2002 6/15/2002
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
11340 5086 FT 11340 5086 FT 181 Yes 0 No
22. Type Electric or Other Logs Run
MWD, GR, DIR, DEN, PWD, ABI, RES
23.
CASING
SIZE
2011 X 3411
9-5/811
711
WT. PER FT.
215.5#
40#
26#
12.6#
4-1/211
Classification of Service Well
7. Permit Number
202-099
8. API Number
50- 029-23087 -61
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
W-203L2
11. Field and Pool
Prudhoe Bay Field / Polaris Pool
(Undefined)
15. Water depth, if offshore 16. No. of Completions
N/A MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
(Nipple) 2403' MD 1900' (Approx.)
GRADE
A53
L-80
L-80
L-80
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH HOLE
Top BOTTOM SIZE CEMENTING RECORD
Surface 104' 4811 260 sx Arctic Set (Approx.)
34' 4065' 12-1/411 640 sx PF 'L', 274 sx Class 'G'
31' 7135' 8-3/411 451 sx Class 'D-600G' Latex
7120' 11310' 6-1/811 Uncemented Slotted Liner
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
4-1/211 Slotted Liner
MD TVD
7201' -11266' 5061' - 5086'
27.
Date First Production
June 22, 2002
Date of Test Hours Tested
7/6/2002 4
25.
SIZE
4-1/211, 12.6#, L-80
MD
TVD
AMOUNT PULLED
TUSING RECORD
DEPTH SET (MD)
6996'
PACKER SET (MD)
6894'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect with 81 Bbls of Diesel
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
Gas Lift
PRODUCTION FOR OIL-BSL
TEST PERIOD 241 0
GAs-McF
1256
WATER-BsL
0
CHOKE SIZE
1760
OIL GRAVITY-API (CORR)
GAS-OIL RATIO
521
Flow Tubing Casing Pressure CALCULATED
Press. 24-HoUR RATE
r"'" f ('~ Ii''''' . 't , 11- . "
28. CORE DATA '.~ -I ~- ~ 'It, I. ~. ~ i
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit J;~e hips.
No core samples were taken.
Form 10-407 Rev. 07-01-80
OIL-BsL
GAs-McF
WATER-BsL
r-~\ .f
r I
11 \1 ') ~
I.) ,....,,':"- 1.-." '../
Alas!\,î:1 \ j ,: :>
~n(;i¡;J' ".
GfC
R B DMS B F L ,-JdL. 2 ~J ¿UIL)
'Submit In Duplicate
)
29. Geologic Markers
Marker Name Measured
Depth
Ma 6233'
Mb1 6320'
Mb2 64261
Mc 6534'
Na 6644'
Nb 6697'
Nc 6791'
OA 7005'
OBa 7137'
31. List of Attachments:
)
30.
Formation Tests
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered and
gravity, GOR, and time of each phase.
4583'
4632'
4691'
4750'
4808'
4836'
4883'
4981'
5037'
,)
f.!¡
Il.,:ons, l~Ü¡:!iHn¡SGim
,f,\nchoraç¡e
Summary of Daily Drilling Reports, Surveys
32. I ~erebY certify that the f~oin: is true and correct to the best of my knowledge
Signed Teme Hubble /f t7J1 J\J, J~ T~le Technical Assistant
W-203L2 202-099
Well Number Permit No. / Approval No.
Date 07' ;;(3"0~
Prepared By Name/Number: Terrie Hubble, 564-4628
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 28: If no cores taken, indicate 'none'.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
Form 10-407 Rev. 07-01-80
: \ \
Legal Name: W-203
Common Name: W-203
Test Date
5/29/2002
6/212002
FIT
FIT
Test Type
Test Depth (TMD)
4,065.0 (ft)
7,781.0 (ft)
BP
Leak..Off. Test Summary
Test Dèpth (TVD)
3,212.0 (ft)
5,204.0 (ft)
AMW
9.00 (ppg)
9.00 (ppg)
SurfåcePressul"e
430 (psi)
705 (psi)
Lèål<-OffPressLJte.CBH P)
1,932 (psi)
3,138 (psi)
Page 10f 1
EMW
11.58 (ppg)
11.61 (ppg)
~
-'
Printed: 6/17/2002 11 :29:27 AM
)
)
BP
Operations Summary Rèport
Page 1.of8
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-203
W-203
DRILL +COMPLETE
DOYON
DOYON 14
Start: 5/23/2002
Rig Release: 6/15/2002
Rig Number:
Spud Date: 5/23/2002
End: 6/15/2002
Date From -To Hours Task Code NPT Phase Description of Operations
5/22/2002 03:30 - 04:30 1.00 MOB P PRE Slide rig floor into moving position.
04:30 - 07:30 3.00 MOB P PRE Move rig off W-08A and spot over well W-203.
07:30 - 08:00 0.50 MOB P PRE Slide rig floor into drilling position
08:00 - 11 :30 3.50 RIGU P PRE Accept rig at 08:00 5/22/02. NU surface hydril and diverter
system while taking on spud mud.
11 :30 - 13:00 1.50 RIGU P PRE Load HWDP in pipe shed and strap. PU BHA to rig floor.
Change jaws in iron roughneck.
13:00 - 13:30 0.50 RIGU P PRE PU HWDP, jars, flex DCs and rack in derrick.
13:30 - 14:00 0.50 RIGU P PRE Function test diverter.
14:00 - 15:30 1.50 DRILL P SURF Continue to PU HWDP.
15:30 - 16:00 0.50 DRILL P SURF Fill surface stack and check for leaks. Test mud line to 3,500
psi.
16:00 - 16:30 0.50 DRILL P SURF MU BHA.
16:30 - 17:00 0.50 DRILL P SURF Pre spud meeting.
17:00 - 00:00 7.00 DRILL N WAIT SURF Ready to spud well. Rig on standby starting at 17:00 due to
cuttings disposal issue related to Kuparuk River bridge outage.
Contiue to MU BHA. PU 5" DP needed for intermediate hole
section.
5/23/2002 00:00 - 00:00 24.00 DRILL N WAIT SURF Standby due to lack of cuttings disposal options related to
Kuparuk Bridge outage. Replace chains on mud pumps. Strap
and rabbit 9 5/8" casing. Clean 7" casing.
5/24/2002 00:00 - 17:00 17.00 DRILL N WAIT SURF Standby due to lack of cuttings disposal options related to
Kuparuk River bridge outage.
17:00 - 17:30 0.50 DRILL P SURF Upload to MWD.
17:30 - 00:00 6.50 DRILL P SURF Drill from 104' to 434'. AST=1.3, ART=2.47.
5/25/2002 00:00 - 16:00 16.00 DRILL P SURF Drill from 434' to 1,302'. Not achieving required build rate.
AST=13.31, ART= 0.58.
16:00 - 17:00 1.00 DRILL P SURF Cbu. Flow check. Well static.
17:00 - 18:30 1.50 DRILL P SURF POH. Pump out from 1,176' to 720'. Hole taking proper fluid.
18:30 - 19:00 0.50 DRILL P SURF Stand back BHA.
19:00 - 20:30 1.50 DRILL P SURF Change bit. Down load MWD. Upload MWD. Run BHA in
hole.
20:30 - 21 :00 0.50 DRILL P SURF Service rig.
21 :00 - 21 :30 0.50 DRILL N RREP SURF Repair hydraulic fitting on top drive.
21 :30 - 22:30 1.00 DRILL P SURF RIH and wash last stand to bottom. Approx. 15' of fill.
22:30 - 00:00 1.50 DRILL P SURF Drill form 1,302' to 1,395'. AST=1.0, ART=0.25.
5/26/2002 00:00 - 14:00 14.00 DRILL P SURF Drill from 1,395' to 2,733' building angle. Drilling time from
00:00 to 12:00; AST=7.75, ART=1.54.
14:00 -15:00 1.00 DRILL P SURF Circulate hole clean.
15:00 - 16:30 1.50 DRILL P SURF Wiper trip to 1,270'. Pump out of hole from 2,340' to 2,240'
and 1,685' to 1,270'.
16:30 - 17:30 1.00 DRILL P SURF RIH. Work through tight hole from 1,535' to 1,735' with 40
spm.
17:30 - 00:00 6.50 DRILL P SURF Drill from 2,733' to 3,594'. Drilling time from 12:00 to 24:00;
AST=1.53, ART=5.81.
5/27/2002 00:00 - 04:00 4.00 DRILL P SURF Drill from 3,594' to surface hole TO at 4,078'. ART=2.22,
AST=0.33.
04:00 - 05:00 1.00 DRILL P SURF Circulate hole clean at 650 gpm, 100 rpm with low viscosity
sweep.
05:00 ~ 08:00 3.00 DRILL P SURF Wiper trip to 1,716'. Work tight spots at tool joints from 3,805'
to 2,960' without pump. Pump and back ream out of hole as
needed to 1,812'. RIH wlo problems.
08:00 - 09:00 1.00 DRILL P SURF Circulate hole clean at 650 gpm, 2,700 psi, 100 rpm with
Printed: 6/1712002 11:29:36AM
'}
)
BP
Operations Summary Report
Page 2of8
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-203
W-203
DRILL +COMPLETE
DOYON
DOYON 14
Start: 5/23/2002
Rig Release: 6/15/2002
Rig Number:
Spud Date: 5/23/2002
End: 6/15/2002
Date From- To Hours Task Code NPT Phase Description. bfOperations
5/27/2002 08:00 - 09:00 1.00 DRILL P SURF weighted sweep.
09:00 - 11 :00 2.00 DRILL P SURF Flow check. Well static. Pump dry job and POH. Hole in good
shape, no circulating or back reaming needed on TOH.
11 :00 - 12:00 1.00 DRILL P SURF LD BHA.
12:00 - 12:30 0.50 DRILL P SURF Clear floor of BHA.
12:30 - 14:00 1.50 CASE P SURF RU to run 9 5/8" casing.
14:00 - 21 :30 7.50 CASE P SURF Run 98 joints of 9 5/8", 40#, L-80, BTC casing with 1 Tam port
collar to 4,065'.
21 :30 - 22:00 0.50 CASE P SURF PU landing joint and land casing.
22:00 - 23:30 1.50 CASE P SURF Circulate and condition mud. Stage up circulation rate to 9
bpm. Reciprocate string while conditioning mud for cement job.
23:30 - 00:00 0.50 CASE P SURF Install cement head.
5/28/2002 00:00 - 01 :00 1.00 CASE P SURF Circulate I condition mud for cementing
9 bpm at 550 psi, PU WT 180K, SO WT 125K
01 :00 - 04:30 3.50 CEMT P SURF Cement as per program,
Plug bumped to 1400 psi
04:30 - 05:00 0.50 CEMT P SURF Rig down cement equipment
05:00 - 06:30 1.50 DIVRTR P SURF Nipple down diverter, riser
06:30 - 07:30 1.00 BOPSURP INT1 Nipple up well head
07:30 - 10:30 3.00 BOPSUR P INT1 Nipple up BOPE, riser, flowline
10:30 - 12:00 1.50 BOPSUR P INT1 Rig up to pressure test BOPE
12:00 ~ 13:30 1.50 BOPSUR P INT1 Run test plug, pull and redress test plug rubber
Run test plug
13:30 - 17:30 4.00 BOPSUR P INT1 Pressure test BOPE as per AOGCC I BP regulations
PT annular to 250 I 2500 psi
PT all BOPE to 250 I 3500 psi
17:30 - 18:00 0.50 BOPSUR P INT1 Rig down pressure test equipment
18:00 - 18:30 0.50 BOPSUR P INT1 Run wear bushing
18:30 - 19:00 0.50 DRILL P INT1 PU, MU bales I elevators
19:00 - 20:00 1.00 DRILL P INT1 PU, MU, directional BHA
20:00 - 21 :00 1.00 DRILL P INT1 Upload MWD
21 :00 - 21 :30 0.50 DRILL P INT1 PJSM, load nuclear sources in to MWD
21 :30 - 22:30 1.00 DRILL P INT1 Trip in, at 936', rotate at 10 RPM through TAM collar
Pressure test casing to 1000 psi, confirm TAM closed
22:30 - 23:00 0.50 DRILL P INT1 Well control drill 0 5
23:00 ~ 00:00 1.00 DRILL P INT1 Trip in to 3980'
5/29/2002 00:00 - 01 :00 1.00 DRILL INT1 Rig service, slip I cut drilling line
Service top drive
01 :00 - 01 :30 0.50 DRILL INT1 Trip in to 3980', tag cement
01 :30 - 02:00 0.50 DRILL INT1 Circulate bottoms up, 10 bpm at 1550 psi
02:00 - 02:30 0.50 DRILL INT1 Well control drill, 0 5
02:30 - 03:00 0.50 DRILL INT1 Pressure test casing to 3000 psi for 30 minutes
Record on chart
03:00 - 05:30 2.50 DRILL INT1 Drill cement from 3980' to 4065', drill new wellbore from
4078' to 4098'. Begin mud swap on the fly.
05:30 - 06:00 0.50 DRILL INT1 Circulate bottoms up, C/O to new 9 ppg LSND mud
06:00 - 06:30 0.50 DRILL INT1 FIT to 11.6 ppg, applied surface 430 psi
06:30 - 12:00 5.50 DRILL INT1 Directional drill 83/4" wellbore from 4098' to 5105'
ART 3.8. AST 0.16, ADT 3.96
12:00 - 17:30 5.50 DRILL INT1 Directional drill from 5105' to 6091'
17:30 - 18:30 1.00 DRILL INT1 Circulate sweep from surface to surface
18:30 - 20:30 2.00 DRILL INT1 Wiper trip, 22 stands, pull 8, sticky, pull 2, swab 1.5 bbls,
pump out 5, hole fill OK, pull 7, flow checks OK
Printed: 6/1712002 11 :29:36 AM
)
')
BP
Operations Summary Report
Page30f8
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-203
W-203
DRILL +COMPLETE
DOYON
DOYON 14
Start: 5/23/2002
Rig Release: 6/15/2002
Rig Number:
Spud Date: 5/23/2002
End: 6/15/2002
Date From - To Hours Task Code NPT Phase Description of Operations
5/29/2002 20:30 - 21 :00 0.50 DRILL INT1 Rig service, service top drive
Circulate bottoms up at shoe
21 :00 - 22:00 1.00 DRILL INT1 Trip back to bottom, wellbore in good condition,
Wash last stand down
22:00 - 00:00 2.00 DRILL INT1 Directional drill 8 3/4" wellbore from 6091' to 6300'
ART 3.97, AST 0.9, ADT 4.87
5/30/2002 00:00 - 12:00 12.00 DRILL P INT1 Directional drill 8 3/4" wellbore from 6300' to 7337'
AST 4.9, ART 3.9, ADT 8.8
12:00 - 16:30 4.50 DRILL P INT1 Directional drill from 7337' to 7791'
AST 1.89, ART 2.11, ADT 3
16:30 - 18:00 1.50 DRILL P INT1 Circulate weighted sweep surface to surface
18:00 - 20:00 2.00 DRILL P INT1 Wiper trip to 6000', wellbore in good condition
20:00 - 23:00 3.00 DRILL P INT1 Circulate hi vis weighted sweep surface to surface,
Circulate second hi vis weighted sweep to clean up
wellbore and shakers, shakers clean
Pump 290 bbl liner running pill
23:00 - 00:00 1.00 DRILL P INT1 Flow check, pump dry job, POOH LOOP
5/31/2002 00:00 ~ 05:30 5.50 DRILL P INT1 Lay down drillpipe, wellbore in good condition
05:30 - 08:00 2.50 DRILL P INT1 Lay down BHA, remove sources, download MWD
08:00 - 08:30 0.50 CASE P INT1 Pull wear bushing
08:30 - 10:00 1.50 CASE P INT1 Rig up to run casing, Franks Tool, C/O bales
10:00 - 11:00 1.00 CASE P INT1 PU, MU, float shoe jt I float collar jt, fill, check floats
11 :00 - 15:30 4.50 CASE P INT1 Run 7" casing, ran 190 jts of 26#, L-80, BTC,
Total length wI shoe, float, pups 7749.99' landed at
7781.34' MD
15:30 - 17:00 1.50 CASE P INT1 Circulate at shoe 7 bpm at 710 psi. No losses during TIH or
while circulating/conditioning.
17:00 - 19:30 2.50 CASE P INT1 Get up and down wts. at shoe. Run casing with no tight hole
conditions. Hole giving back proper displacement during trip in.
19:30 - 20:00 0.50 CASE P INT1 PU, MU, landing jt, land casing, rig down casing running
tools
20:00 - 21 :00 1.00 CASE P INT1 Break circulation slowly and stage up to 7 bpm at 780 psi,
PJSM wI cementers
21 :00 ~ 21 :30 0.50 CASE P INT1 Rig down Franks Tool, rig up cementers head,
Circulate to condition mud for cementing, 7 bpm
21 :30 - 23:30 2.00 CEMT P INT1 Cement as per program. Reciprocate until 15 bbls. from
bump. No adverse hole conditions or packing off during
circulation, prior to, or during cement job.
23:30 - 00:00 0.50 CEMT P INT1 Rig down cement equipment
6/1/2002 00:00 - 01 :00 1.00 BOPSUR P INT1 Install pack off, pressure test to 5000 psi
01 :00 - 01 :30 0.50 CASE P INT1 Clear rig floor, cement I casing tools
Function blind rams
01 :30 - 03:30 2.00 DRILL P PROD1 C/O top pipe rams to 27/8" x 5"
C/O saver sub on top drive to 3 1/2" IF
03:30 - 04:00 0.50 DRILL P PROD1 Pressure test rams to 250 low, 3500 high
04:00 - 04:30 0.50 DRILL P PROD1 Run wear bushing
04:30 ~ 06:00 1.50 DRILL P PROD1 Load pipe shed wI 3 1/2" DP, tally, strap
06:00 - 12:00 6.00 DRILL P PROD1 PU, MU, 31/2" DP, rabbit, RIH to 7630'
12:00 - 14:30 2.50 DRILL P PROD1 Circulate drillpipe clean at 8.5 bpm, 2400 psi
Contaminated mud to surface, treat mud
14:30 - 15:30 1.00 DRILL P PROD1 Freeze protect annlus, formation broke at 750 psi
Little Red pumped 65 bbls dead crude at 2.5 bpm,
1600 psi
Printed: 6/1712002 11 :29:36 AM
')
)
Page 4 of 8
BP
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-203
W-203
DRILL +COMPLETE
DOYON
DOYON 14
Date
From- To Hours Task Code NPT Phase
6/1/2002
15:30 - 17:30 2.00 DRILL P
17:30 - 18:00 0.50 DRILL P
18:00 - 21 :00 3.00 DRILL P
21 :00 - 21 :30 0.50 DRILL P
21 :30 - 22:30 1.00 DRILL P
22:30 - 00:00 1.50 DRILL P
00:00 - 04:00 4.00 DRILL P
04:00 - 04:30 0.50 DRILL P
04:30 - 07:00 2.50 DRILL P
07:00 - 08:30 1.50 DRILL N
08:30 - 09:30 1.00 DRILL N
09:30 - 10:00 0.50 DRILL N
10:00 - 10:30 0.50 DRILL P
10:30 - 12:00 1.50 DRILL P
12:00 - 12:30 0.50 DRILL P
12:30 -13:30 1.00 DRILL P
13:30 - 15:00 1.50 DRILL P
15:00 - 15:30 0.50 DRILL P
15:30 - 17:00 1.50 DRILL P
17:00 - 18:00 1.00 DRILL P
18:00 - 18:30 0.50 DRILL P
18:30 - 19:00 0.50 DRILL P
19:00 - 19:30 0.50 DRILL P
19:30 - 00:00 4.50 DRILL P
6/2/2002
6/3/2002 00:00 - 12:00 12.00 DRILL P
12:00 - 14:00 2.00 DRILL P
14:00 - 15:30 1.50 DRILL P
15:30 - 17:00 1.50 DRILL P
17:00 - 00:00 7.00 DRILL P
6/4/2002 00:00 - 11 :00 11.00 DRILL P
11 :00 - 12:30 1.50 DRILL P
12:30 - 14:30 2.00 DRILL P
14:30 - 16:00 1.50 DRILL P
16:00 - 17:00 1.00 DRILL P
17:00 - 19:30 2.50 DRILL P
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
DFAL PROD1
DFAL PROD1
DFAL PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
Start: 5/23/2002
Rig Release: 6/15/2002
Rig Number:
Spud Date: 5/23/2002
End: 6/15/2002
Description of Operations
Blow down top drive, POOH, rack back DP
Rig up to run 3 1/2" DP
Function blind rams
PU, MU, 31/2" DP, rabbit, RIH
Circulate drillpipe clean at 8.5 bpm at 2400 psi
Blow down top drive, POOH, rack back DP
Run USIT log wI Schlumberger
Run USIT,CCL,GR log wI Schlumberger
Rig down loggers
PU, MU BHA, upload MWD, orient, test MWD
Trouble shoot ABI problem, communication from MWD to
ASI
C/O mud motor, ASI sensor failure
Function test mud motor ASI I MWD
PJSM, load nuclear sources
Trip in directional SHA
Rig service
Trip in to 7590'
Rig service, slip I cut drilling line, service top drive
Circulate casing
Pressure test casing to 3000 psi, record on chart
Wash from 7590' to 7688', tag cement, drill cement to
7697', top of float collar, drill cement to 7783' top of float
shoe
Displace to new Baradril 9.0 ppg mud
Directional drill from 7791' to 7811', 20' new hole
Clean mud tanks, shakers, flow lines for new mud
FIT to 11.6 ppge, applied surface pressure 705 psi, 5204
rvD with 9ppg mud.
Directional drill 6 1/8" lateral # 1 wellbore
Drill from 7811' to 8161'
AST 1.49, ART 1.75, ADT 3.24
Directional drill 6 1/8" lateral # 1 production wellbore
From 8161' to 9230'
AST 1.34, ART 6.45, ADT 7.79
Directional drill from 9230' to 9495'
Circulate sweep surface to surface, circulate untill
shakers clean, flow check
Wiper trip from 9495' to 7780', flow checks
Wellbore in good condition
Directional drill from 9495' to 10261'
AST 0.82, ART 4.18, ADT 5
Directional drill 6 1/8" lateral # 1 production wellbore
From 10621' to 11320', TO
AST 0.57, ART 5.31, ADT 5.88
Circulate weighted sweep surface to surface
Circulate untill shakers clean, flow check
Wiper trip from 11320' to 9450'
Wellbore in good condition
Circulate weighted sweep surface to surface
Circulate liner running pill, 150 bbls, 2 % lubricants
Flow check, trip out, SLM, record drill string parameters
Printed: 611712002 11 :29:36 AM
')
)
BP
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
6/4/2002
6/5/2002
6/6/2002
617/2002
Date
W-203
W-203
DRILL +COMPLETE
DOYON
DOYON 14
From - To Hours Task Code NPT Phase
19:30 ~ 20:00
0.50 DRILL P
PROD1
20:00 ~ 22:30
22:30 - 00:00
2.50 DRILL P
1.50 DRILL P
PROD1
PROD1
00:00 - 01 :30
01 :30 - 02:00
02:00 - 05:30
1.50 DRILL P
0.50 CASE P
3.50 CASE P
PROD1
PROD1
PROD1
05:30 ~ 06:30 1.00 CASE P
06:30 - 08:00 1.50 CASE P
08:00 - 08:30 0.50 CASE P
08:30 - 10:00 1.50 CASE P
10:00 - 10:30 0.50 CASE P
1 0:30 ~ 11 :30 1.00 CASE P
11 :30 - 14:00 2.50 CASE P
14:00 - 14:30 0.50 BOPSUR P
14:30 -15:30 1.00 BOPSUR P
15:30 - 18:30 3.00 BOPSURP
18:30 - 19:00 0.50 BOPSUR P
19:00 - 19:30 0.50 BOPSUR P
19:30 - 22:30 3.00 STWHIP P
22:30 - 00:00 1.50 STWHIP P
00:00 - 02:30 2.50 STWHIP P
02:30 - 03:00 0.50 STWHIP P
03:00 - 07:00 4.00 STWHIP P
07:00 - 07:30 0.50 STWHIP P
07:30 - 12:00 4.50 STWHIP P
12:00 - 13:30 1.50 STWHIP P
13:30 - 14:00 0.50 STWHIP P
14:00 - 14:30 0.50 STWHIP P
14:30 - 16:00 1.50 STWHIP P
16:00 - 17:00 1.00 STWHIP P
17:00 - 17:30 0.50 STWHIP P
17:30 - 18:00 0.50 STWHIP P
18:00 - 22:30 4.50 DRILL P
22:30 - 00:00 1.50 DRILL P
00:00 - 01 :00 1.00 DRILL P
01 :00 - 01 :30 0.50 DRILL P
01 :30 - 02:30 1.00 DRILL P
02:30 - 12:00 9.50 DRILL P
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD1
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
Page 50fa
Start: 5/23/2002
Rig Release: 6/15/2002
Rig Number:
Spud Date: 5/23/2002
End: 6/15/2002
Description of Operations
Log for RA tag wI MWD, 7497.41' pump dry job, blow
down TDS, drop rabbit
Flow check, trip out in casing
Recover rabbit on top of jars, 7635' DP drifted
Stand back jars 12 DCs, PJSM, remove sources
Download MWD, SLM no correction
Download MWD, LD BHA
Rig up tools to run 4 1/2" liner
Ran 4 1/2" 12.6#, BTC, L-80, 120 jts slotted,
3 jts solid, wI shoe, packoff bushing, XIO's, XN nipple,
HMC hanger, ZXP packer, total length 3702.71'
PU, MU, HMC hanger, ZXP packer,
Trip liner in on DP to 7781', weights every 1000'
Circulate bottoms up, 40 spm at 450 psi
Trip liner in on DP to 11,320', tag up, weights every
1000'
Circulate bottoms up, 55 spm at 1240 psi
Set hanger, set packer, pressure test packer to 1600 psi
Packer top at 7617.29'
Flow check, pump dry job, POOH
Pull wear bushing
Rig up to pressure test BOPE
Pressure test BOPE as per AOGCC I BP regs
Test waived by Jeff Jones of AOGCC
Rig down pressure test equipment
Run wear bushing
PU, MU, rabbit, 7 DP, 8 DC, 18 HWDP, RIH
Circulate to flush out pipe bore, rack in derrick
RIH wI MWD, load probe, upload MWD
MU whipstock assembly
Upload MWD, surface test
Trip in whipstock BHA, trip speed 120 seconds I stand
Fill pipe every 20 stands, 7307'
Orient whipstock, tag I set at 15 degrees left I high side
Top 7326', bottom 7363'
Mill window from 7363' to 7394'
Displace to new mud, circulate casing clean
Flow check, POOH to 6000'
Flow check, pump dry job, blowdown top drive
Trip out to BHA
LD 2 x HWDP, rack back HWDP, DCs, LD bumper sub
subs, mills, mills in gauge
Clear rig floor
Circulate and flush BOP stack
PU, MU, directional BHA, MU MWD, install probe, upload,
C/O probe, upload, load sources, surface test
Trip in directional BHA
Trip in directional BHA to 7300'
Orient tool face to high side
Rig service, slip I cut drilling line, service top drive
Directional drill lateral # 2, production wellbore
From 7394' to 8,305'
AST 1.95, ART 3.27, ADT 5.22
Printed: 611712002 11 :29:36 AM
')
)
Page 6 of 8
BP
Operations Summary Report
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-203
W-203
DRILL +COMPLETE
DOYON
DOYON 14
Date
From - To Hours Task Code NPT Phase
6/7/2002
12:00 - 20:00 8.00 DRILL P
20:00 - 21 :00 1.00 DRILL P
21 :00 - 22:30 1.50 DRILL P
22:30 - 22:45 0.25 DRILL P
22:45 - 00:00 1.25 DRILL P
00:00 - 12:00 12.00 DRILL P
PROD2
PROD2
PROD2
PROD2
PROD2
6/8/2002
PROD2
12:00 - 19:00 7.00 DRILL P
19:00 - 20:30 1.50 DRILL P
20:30 - 22:00 1.50 DRILL P
22:00 - 23:30 1.50 DRILL P
23:30 - 00:00 0.50 DRILL P
6/9/2002 00:00 - 05:30 5.50 DRILL P
05:30 - 08:00 2.50 DRILL P
08:00 - 09:30 1.50 DRILL P
09:30 - 11 :00 1.50 DRILL P
11 :00 - 11 :30 0.50 DRILL P
11 :30 - 14:30 3.00 DRILL P
14:30 - 16:30 2.00 DRILL P
16:30 - 17:00 0.50 DRILL P
17:00 - 17:30 0.50 CASE P
17:30 - 22:00 4.50 CASE P
22:00 - 22:30 0.50 CASE P
22:30 - 00:00 1.50 CASE P
6/10/2002 00:00 - 02:30 2.50 CASE P
02:30 - 03:00 0.50 CASE P
03:00 - 05:00 2.00 CASE P
05:00 - 05:30 0.50 ZONISO P
05:30 - 08:30 3.00 ZONISO P
08:30 - 09:30 1.00 ZONISO P
09:30 - 10:30 1.00 ZONISO P
10:30 - 12:30 2.00 ZONISO P
12:30 - 13:00 0.50 ZONISO P
13:00 - 15:00 2.00 SìWHIP P
15:00 - 17:30 2.50 SìWHIP P
17:30 - 18:00 0.50 SìWHIP P
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
PROD2
COMP
COMP
COMP
COMP
COMP
COMP
PROD3
PROD3
PROD3
Start: 5/23/2002
Rig Release: 6/15/2002
Rig Number:
Spud Date: 5/23/2002
End: 6/15/2002
Description of Operations
Directional drill from 8305' to 9303'
Circulate sweep surface to surface, take SPRs, Survey
Flow check, wiper trip from 9303' to 7400'
Wellbore in good condition, no mud losses
Fill pipe, wash down last stand
Directional drill from 9303' to 9444'
AST 1.39, ART 3.62, ADT 5.01
Directional drill lateral # 2, 6 1/8" production wellbore
From 9444' to 10,733'
AST 1.42, ART 5.07, ADT 6.49
Directional drill, from 10,733' to 11,341' TD
AST 0.73, ART 2.96, ADT 3.69
Pump sweep surface to surface, survey, SPRs
Flow check, wiper trip from 11,341' to 9210',
Wellbore in good condition
Pump sweep surface to surface
Spot 151 bbl liner pill
Flow check, drop 2" rabbit, SLM
Good window exit
Trip out directional BHA,
Flush BHA, remove sources, download MWD, upload
MWD, LD motor,
MU whipstock hook BHA, orient MWD, surface test MWD
Trip in whipstock hook BHA to 7283'
Wash from 7283' to 7367', orient, latch on to whipstock,
pull 185k, 55k over string, pull tail assembly out of liner #
1, lost 3 bbls mud
Flow check, dry job, trip out whipstock
Rack DCs, download MWD, LD whipstock, tail assembly,
seal assembly, function blind rams
Clear rig floor
Rig up to run 4 1/2" liner
Ran 130 jts slotted, 2 jts solid, 2 pup jts, total length wI
hanger 3962.14',
Rig down liner running equipment, rig up to run 3 1/2"
DP
Trip liner in on 3 1/2" DP to window
Trip in wI 4 1/2" liner, # 2
Orient, set liner window hook,
Drop ball, pressure to 2000 psi, pump to 3000 psi to
shear ball seat
Flow check, dry job, Trip out liner running BHA
PU, MU, SC-1 R production packer wI tail assembly
Trip packer in to 7165'
Set packer at 7165', pressure up to 3500 psi to set. Put
1500 psi on back side. Set 25,000 Ibs on packer.
Rig service, slip I cut drilling line, service top drive
Trip out packer running BHA
Clear rig floor
PU, MU, whipstock, mills, upload MWD, orient MWD,
HWDP. surface test MWD
Trip in whipstock at controlled speed
Orient whipstock, 15 degrees left of high side, set anchor
Printed: 6/1712002 11 :29:36 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
6/1 0/2002
6/11/2002
6/12/2002
6/13/2002
6/14/2002
)
)
BP
Operations Summary Report
W-203
W-203
DRILL +COMPLETE
DOYON
DOYON 14
17:30 - 18:00
From-To Hours Task Code NPT Phase
PROD3
18:00 - 22:30
22:30 - 23:30
23:30 - 00:00
00:00 - 01 :30
01 :30 - 03:30
03:30 - 04:30
04:30 - 06:00
06:00 - 07:00
07:00 - 10:00
10:00 - 10:30
10:30 - 14:00
14:00 - 16:00
16:00 - 16:30
16:30 - 00:00
00:00 - 09:00
09:00 - 10:00
10:00 - 11 :00
11 :00 ~ 00:00
00:00 - 01 :00
01 :00 - 02:00
02:00 - 03:00
03:00 - 05:00
05:00 ~ 09:30
09:30 - 12:30
12:30 - 14:00
14:00 - 16:00
16:00 - 17:00
17:00 - 18:00
18:00 - 20:30
20:30 - 23:00
23:00 - 23:30
23:30 - 00:00
00:00 - 04:30
04:30 - 07:00
0.50 STWHIP P
4.50 STWHIP P
PROD3
1.00 STWHIP P
PROD3
0.50 STWHIP P
PROD3
1.50 STWHIP P
2.00 STWHIP P
1.00 STWHIP P
1.50 STWHIP P
1.00 STWHIP P
3.00 STWHIP P
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
0.50 STWHIP P
3.50 STWHIP P
PROD3
PROD3
2.00 STWHIP P
0.50 STWHIP P
PROD3
PROD3
7.50 STWHIP P
PROD3
9.00 STWHIP P
1.00 STWHIP P
1.00 STWHIP P
13.00 STWHIP P
PROD3
PROD3
PROD3
PROD3
1.00 STWHIP P
PROD3
1.00 STWHIP P
1.00 STWHIP P
2.00 STWHIP P
4.50 STWHIP P
PROD3
PROD3
PROD3
PROD3
3.00 STWHIP P
PROD3
1.50 STWHIP P
PROD3
2.00 STWHIP P
1.00 STWHIP P
1.00 STWHIP P
PROD3
PROD3
PROD3
2.50 STWHIP P
2.50 STWHIP P
0.50 STWHIP P
0.50 CASE P
4.50 CASE P
2.50 CASE P
PROD3
PROD3
PROD3
PROD3
PROD3
PROD3
Page? of 8
Start: 5/23/2002
Rig Release: 6/15/2002
Rig Number:
Spud Date: 5/23/2002
End: 6/15/2002
Description.ofOperations
at 20K, shear release bolt 30K. No movement of whipstock
after shear.
Mill window from 7135' to 7147', open hole from 7147' to
7165'
Circulate sweep surface to surface,
Ream window and clean up window
Rig service, service top drive
ready mud pits for displacement
Circulate btms up with sweep. Displace hole with new mud.
POOH for BHA #9.
LD Milling BHA #8.
RU Stack Washer and wash stack.
Pull Wear Bushing. RU BOPE test equipment.
Test BOPE to 250 psi I low for 5 min & 3500 psi I high for 5
min. Test waived by Jeff Jones AOGCC.
RD BOPE test equipment. Install Wear Bushing.
MU Drilling BHA #9: Bit, Mtr, NM Fit sub, NM DC, LWD, PWD,
& Hng off sub. Program & orientate MWD. Shallow test
MWD. PJSM. Load RA source. MU Flex DC's & Jars.
RIH wI BHA #9 on 31/2" DP. Fill DP @ 3500'.
Fill DP. Slow pump rates. Orientate bit thru window @ 7147',
no problems.
Directionally drill from TO @ 7165' to 7729'. AST 2.92, ART
1.58, ADT 4.5.
Directionally drill f/7729' - 9209'.
Circulate bottoms up with a sweep. Flow check. OK.
Wiper trip to 7206' Oust ourside window). Hole Slick.
Dirctionally drill f/9209' - 11211'. AST: 2.36 hr, ART: 8.7 hr,
TDT:10.06 hr.
Directionally drill f/11211' - 11340'. ART: 0.37 hr, AST: 0 hr,
TOT: 0.37 hr. TO Leg #2.
Circulate sweep around. Flow check.
Wiper trip to 9113'. RIH to bottom. Hole slick.
Circulate sweep around. Displace open hole with liner pill.
POOH for Whipstock retrieving BHA. SLM. Hole slick. Log
RA tag @ 7090'.
LD BHA #9. Remove RA source. Down load MWD data.
Stand Back MWD I LWD. LD Mud Mtr and bit.
PU Whipstock retrieving BHA #10: Retrieving tool, 1 jt HWDP,
Fit sub, MWD, Magnets, Bumper sub, oil jars, 8 DC's, 1 jt
HWDP. Orientate MWD with Hook. Shallow test MWD.
TI H to 7029'.
Slip & cut Drill line. Service Rig.
Finnish TIH to Whipstock @ 7137'. PU: 135 K, SO: 110 K.
Orientate Hook tool. Latch whipstock. Pull free @ 170k K.
Flow check. OK. Pump slug.
POOH with Whipstock.
LD BHA & Whipstock. Function Blind rams.
Clear Rig Floor.
RU to run 4.5" liner in Leg #2.
Continue TIH with 4.5" liner.
Change out handling equpipment. MU hook liner hanger. TIH
with 4.5" liner on 3.5" DP. Orientate and exit casing into leg #3
Printed: 6/1712002 11 :29:36 AM
)
')
BP
Operations Summary Report
Page Bof 8
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
W-203
W-203
DRILL +COMPLETE
DOYON
DOYON 14
Start: 5/23/2002
Rig Release: 6/15/2002
Rig Number:
Spud Date: 5/23/2002
End: 6/15/2002
Date From~To Hours Task Code NPT Phase Description of Operations
6/14/2002 04:30 - 07:00 2.50 CASE P PROD3 with liner. Continue TIH to 7144'. PU = 145 K, SO = 100 K.
07:00 - 08:00 1.00 CASE P PROD3 Hook liner hanger in Leg # 3 window. Drop setting ball.
Pressure up to 4200 psi. Release from hanger. PU = 125 K.
SB one stand DP.
08:00 - 09:00 1.00 CASE P PROD3 Displace hole with 9.1 ppg KCI. Flow check.
09:00 - 13:00 4.00 CASE P PROD3 POOH Lay down DP and Running Tool.
13:00 - 16:30 3.50 CASE P PROD3 Run 46 stands DP from derrick. POOH Lay down DP.
16:30 - 17:30 1.00 P COMP Clear Rig floor.
17:30 - 19:00 1.50 CASE P COMP RU slick line unit. TIH wI 6" gauge ring and junk basket.
POOH. RD slick line unit.
19:00 - 19:30 0.50 CASE P COMP Pull Wear Bushing. RU tubing handling tools. PJSM.
19:30 - 00:00 4.50 CASE P COMP MU BHA with PLM packer, Baker-Lok everything below
packer. TIH with 4.5" completion string. Total 167 Jts 4.5",
12.6#, L-80, BTC-M Tubing, 16 - 4.5" tubing pup jts, 3 - "x"
Nipples, 3 - Gas Lift Mandrels, 1 - sliding sleeve, and 1
wireline entry guide.
6/15/2002 00:00 - 02:00 2.00 P COMP Continue to Run 4.5" completion string.
02:00 - 03:00 1.00 CASE P COMP PU landing Jt. Land tubing hanger in well head. RILDS. RU
test manifold.
03:00 - 04:30 1.50 CASE P COMP Reverse circulate bottoms up. Spot 130 bbls inhibited
seawater in annulus.
04:30 - 06:30 2.00 CASE P COMP Drop packer setting ball. Pressure up to 4200 psi on tubing to
set packer. Bleed pressure to 3000 psi for 30 minute tubing
test. Bleed tubing pressure to 1500 psi. Pressure up annulus
to 3000 psi for 30 minute test. Bleed tubing pressure to 0 to
shear RP valve. Pump 3 BBLs @ 2 BPM, 600 psi through
shear valve.
06:30 - 07:00 0.50 CASE P COMP RD landing jt. Set 2 way check valve in hanger. Test from
below to 1000 psi.
07:00 - 08:00 1.00 BOPSUR P COMP ND BOP stack. Change rams to 4.5" x 7".
08:00 - 09:00 1.00 WHSUR P COMP NU Xmas tree. Test adapter flange to 5000 psi for 10 min.
Test tree to 250 low I 5 min and 5000 psi high I 5 min.
09:00 - 10:30 1.50 WHSUR P COMP NU DSM lubricator and pull 2~way check.
1 0:30 ~ 13:30 3.00 WHSUR P COMP RU hot oil truck. Pump 81 BBLs diesel down annulus for
freeze protection. U-Tube freeze protection.
13:30 - 14:00 0.50 WHSUR P COMP Install BPV in tubing hanger and test from bottom to 1000 psi.
14:00 -15:00 1.00 WHSUR P COMP RD hot oil truck. Secure tree.
15:00 - 18:00 3.00 WHSUR P COMP Prepare rig for mob. Rig Released @ 1800 hrs 06-15-2002 to
S-113.
Printed: 6/1712002 11 :29:36 AM
)
AOGCC
Attn: Lisa Weepie
333 W. 7th Avenue, Suite 100
Anchorage, Alaska 99501
Re: Distribution of Survey Data for Well W-203L2 MWD
Dear Sir I Madam:
Enclosed are 2 survey hard copy(s) and 1 disk.
Tie-on Survey:
Window I Kickoff Survey
Projected Survey:
7079.14 'MD
7135.00 I MD
11340.00 ' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
)
aoa~09i
RECEIVED
r! I .<
'-" i: I ì 1)00"
'-''-. ¡(I'
Alaska Oil & GasCon$. Co -. .
Anchorage mmlSSion
0-
0-
Q
,
ð
co
¡ SJ
RBDMS 8FL
,~
North- ~ -~--¡: -:Jaska
..;
PBU_WOA WPad, Slot W-203
W-203L2.IIWD
Job No. AKMW22078, SUlVeyed: 8 June, 2002
SURVEY~<~----- PORT
8 July, 2"2
Your Ref: API soø8230B761
Surface Coordinates: 5958645.16 N, 612049.0BE .(10°11' 45.4671- N, 149005' 33.6448" W)
Kelly Bushing: 87. 14ft above Mean Sea Level
"----
..... . .I!ï-''''¡'''''.'''''' n-t. . .
. :I ........ :
DAIL.LING s-=l"Ivlces
A Halliburton Company
Survey Ref: svy11242
Sperry-Sun Drilling Services .
Survey Report for W.:æ3L2 MWD
Your Ref: API 5f102Ø-2308761
Job No. AKMW22078, Surveyed: 8 June, 2002
BPXA
North Slope Alaska PBU_WOA W Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azlm. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/1 OOft)
7079.14 64.770 125.260 4926.52 5013.66 595.64 S 4359.86 E 5958114.59 N 616417.33 E 4090.77 Tie On Point
- 4400.87 E 5958085.32 N 616458.79 E 3.234 4141.17 Window Point
7135.00 65.830 126.870 4949.86 5037.00 625.51 S
7169.23 68.750 126.450 4963.07 5050.21 644.36 S 4426.20 E 5958066.85 N 616484.40 E 8.605 4172.49
7201.68 72.090 126.080 4973.95 5061.09 662.45 S 4450.85 E 5958049.14 N 616509.31 E 10,349 4202.84
7234.21 75.620 125.720 4982.99 5070.13 680.76 S 4476.16 E 5958031.20 N 616534.89 E 10.903 4233.88
7266.02 79.600 125.380 4989.81 5076.95 698.82 S 4501.43 E 5958013.52 N 616560.43 E 12,555 4264.77
7297.59 83.020 125.050 4994.58 5081.72 716.82 S 4526.93 E 5957995.91 N 616586.19 E 10.882 4295.81
7328.35 86.550 127.230 4997.38 5084.52 734.88 S 4551.66 E 5957978.22 N 616611.19 E 13.472 4326.22
7363.30 90.920 127,720 4998.15 5085.29 756.13 S 4579.38 E 5957957.38 N 616639.22 E 12.582 4360,81
7396.16 93,690 132.950 4996.83 5083.97 777.37 S 4604.40 E 5957936.51 N 616664.56 E 17,998 4393,03
7424.08 94.250 135.710 4994.90 5082.04 796.84 S 4624.32 E 5957917.35 N 616684.77 E 10.064 4419.94
7473.57 93.570 142.370 4991.52 5078.66 834.10 S 4656.67 E 5957880.57 N 616717.66 E 13.496 4466.42
7519.45 93.510 141.870 4988.68 5075.82 870.25 S 4684.78 E 5957844.85 N 616746.32 E 1,096 4508.66
7554,77 94.000 140.070 4986.37 5073.51 897.62 S 4706.98 E 5957817.81 N 616768.92 E 5.271 4541.43
7586.67 93.820 140.710 4984.20 5071.34 922.14 S 4727.27 E 5957793.60 N 616789.57 E 2,080 4571.14
7615.33 93.880 142.280 4982.27 5069.41 944.52 S 4745.07 E 5957771.49 N 616807.70 E 5.470 4597.64
7661.38 89.570 138.460 4980.88 5068.02 979.95 S 4774.42 E 5957736.49 N 616837.58 E 12.503 4640.60
7710.94 88.890 137.590 4981.55 5068.69 1016.79 S 4807.56 E 5957700.15 N 616871.26 E 2,228 4687.56
7756.84 89,140 139.770 4982.34 5069.48 1051.26 S 4837.86 E 5957666.14 N 616902.08 E 4,780 4730.88
7806.47 89.570 141.710 4982.90 5070.04 1089.68 S 4869.26 E 5957628.19 N 616934.05 E 4,004 4777.10
7850.75 88.890 143.310 4983.49 5070.63 1124.81 S 4896.21 E 5957593.47 N 616961.52 E 3.926 4817,82
7902.04 89.450 145.760 4984.24 5071.38 1166.58 S 4925.96 E 5957552.15 N 616991.89 E 4,899 4864.25
7952.36 89.320 146.960 4984.78 5071.92 1208.47 S 4953.84 E 5957510.68 N 617020.38 E 2.399 4909.09
7997.28 89.570 148.130 4985.21 5072.35 1246.37 S 4977.94 E 5957473.14 N 617045.05 E 2.663 4948.70
8044.63 89,880 150.590 4985.44 5072.58 1287.11 S 5002.07 E 5957432.77 N 617069.78 E 5.236 4989.72
8092.98 90.060 151.830 4985.46 5072.60 1329.48 S 5025.36 E 5957390.75 N 617093,70 E 2.592 5030.81
8139.86 91.350 152.910 4984.89 5072.03 1371.01 S 5047.10 E 5957349.55 N 617116.05 E 3.589 5070.13
8188.87 91.660 152.010 4983.60 5070.74 1414.45 S 5069.75 E 5957306.45 N 617139.35 E 1,942 5111,19
8234.32 90.980 151.010 4982.55 5069.69 1454.38 S 5091.42 E 5957266.84 N 617161.62 E 2.660 5149.68
8284.58 89.940 148.580 4982.15 5069.29 1497.81 S 5116.70 E 5957223.79 N 617187.55 E 5,259 5193,03
- --.. ---.------
8 July, 2002 - 15:58
Page 2 of6
Dri/lQuest 2.00.08.005
Sperry-Sun Drillmg Services .
Survey Report for W-~03L2 MWD
Your Ref: APlsoøz-.230B761
Job No. AKMW22078, Sl1lYéyed: 8 June, 2002
BPXA
North Slope Alaska PBU_WOA W Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azlm. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
8329.96 90.370 146.900 4982.03 5069.17 1536.19 S 5140.93 E 5957185.78 N 617212.34 E 3.821 5232.97
.-- 8379.32 89.200 147.900 1577.77 S 5167.52 E 5957144.60 N 617239.55 E 3.118 5276.55
4982.21 5069.35
8424.68 89.450 146.060 4982.75 5069.89 1615.80 S 5192.23 E 5957106.95 N 617264.82 E 4.093 5316.75
8473.28 90.060 148.040 4982.95 5070.09 1656.58 S 5218.67 E 5957066.57 N 617291.86 E 4.263 5359.79
8518.71 89.880 148.370 4982.98 5070.12 1695.19 S 5242.60 E 5957028.31 N 617316.37 E 0.827 5399.60
8569.67 90.490 146.610 4982.81 5069.95 1738.16 S 5269.99 E 5956985.76 N 617344.40 E 3.655 5444.56
8616.27 89.690 146.570 4982.74 5069.88 1777.06 S 5295.65 E 595694 7 .24 N 617370.63 E 1.719 5486.01
8663.58 90.250 145.490 4982.77 5069.91 1816.30 S 5322.08 E 5956908.41 N 617397.65 E 2.571 5528.30
8708.33 89.510 145.960 4982.86 5070.00 1853.28 S 5347.28 E 5956871.81 N 617423.40 E 1.959 5568.41
8759.10 89.940 148.050 4983.10 5070.24 1895.85 S 5374.93 E 5956829.65 N 617451.68 E 4.203 5613.39
8808.82 90.430 146.610 4982.94 5070.08 1937.71 S 5401.77 E 5956788.20 N 617479.13 E 3.059 5657.32
8853.91 90.990 149.560 4982.38 5069.52 1975.97 S 5425.60 E 5956750.29 N 617503.53 E 6.659 5696.87
8901.25 90.550 146.740 4981.75 5068.89 2016.18 S 5450.58 E 5956710.46 N 617529.11 E 6.028 5738.37
8949.27 90.370 145.950 4981.36 5068.50 2056.15 S 5477.19 E 5956670.90 N 617556.31 E 1.687 5781.17
8998.96 89.290 142.230 4981.51 5068.65 2096.39 S 5506.33 E 5956631.10 N 617586.05 E 7.795 5826.31
9045.11 89.510 144.900 4981.99 5069.13 2133.51 S 5533.73 E 5956594.39 N 617614.00 E 5.805 5868.41
9093.34 88.460 145.120 4982.85 5069.99 2173.02 S 5561.38 E 5956555.30 N 617642.24 E 2.224 5911.89
9140.34 88.650 141.770 4984.03 5071.17 2210.75 S 5589.36 E 5956517.98 N 617670.78 E 7.137 5954.80
9187.28 89.010 143.350 4984.99 5072.13 2248.01 S 5617.89 E 5956481.15 N 617699.86 E 3.452 5997.94
9235.81 89.380 142.400 4985.67 5072.81 2286.70 S 5647.18 E 5956442.90 N 617729.72 E 2.101 6042.45
9282.33 90.000 142.550 4985.92 5073.06 2323.60 S 5675.51 E 5956406.43 N 617758.60 E 1.371 6085.25
9330.87 90.740 143.030 4985.61 5072.75 2362.25 S 5704.87 E 5956368.22 N 617788.53 E 1.817 6129.80
9379.94 91.050 144.340 4984.84 5071.98 2401.79 S 5733.92 E 5956329.12 N 617818.17 E 2.743 6174.52
9426.38 90.250 144.460 4984.32 5071.46 2439.54 S 5760.96 E 5956291.77 N 617845.76 E 1.742 6216.61
9475.43 90.550 142.960 4983.98 5071.12 2479.08 S 5789.99 E 5956252.67 N 617875.38 E 3.119 6261.30
9523.05 90.800 143.290 4983.41 5070.55 2517.17 S 5818.56 E 5956215.01 N 617904.52 E 0.869 6304.90
9571.16 90.980 143.100 4982.67 5069.81 2555.69 S 5847.38 E 5956176.93 N 617933.91 E 0.544 6348.91
9616.87 90.120 144.350 4982.23 5069.37 2592.53 S 5874.42 E 5956140.49 N 617961.50 E 3.319 6390.56
9666.03 89.880 145.770 4982.23 5069.37 2632.83 S 5902.57 E 5956100.62 N 617990.25 E 2.929 6434.87
9713.09 89.690 146.740 4982.40 5069.54 2671.96 S 5928.72 E 5956061.88 N 618016.97 E 2.100 6476.85
---------- ---~
---
8 July, 2002 - 15:58
Page 3 0'6
DrillQllest 2.00.08.005
Sperry-Sun Drill~"g Services .
Survey Reporf.for W-203L2 MWD
Your Ref: API5QfJQ2308761
Job No. AKMW22078, SUNêyed: 8 June, 2002
BPXA
North Slope Alaska PBU WOA W Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azlm. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
~- 9761.87 90.180 147.820 4982.46 5069.60 2713.00 S 5955.08 E 5956021.24 N 61-8043.95 E 2.431 6519.97
9808.74 90.000 147.360 4982.39 5069.53 2752.57 S 5980.20 E 5955982.05 N. 618069.65 E 1.054 6561.28
9857.95 89.450 148.370 4982.62 5069.76 2794.24 S 6006.38 E 5955940.77 N 618096.45 E 2.337 6604.54
9904.03 89.880 148.340 4982.89 5070.03 2833.4 7 S 6030.55 E 5955901.91 N 618121.21 E 0.935 6644.86
9952.63 89.080 147.180 4983.33 5070.47 2874.57 S 6056.48 E 5955861.20 N 618147.74 E 2.899 6687.63
10000.31 89.390 146.540 4983.97 5071.11 2914.49 S 6082.54 E 5955821.67 N 618174.40 E 1.491 6729.93
10048.28 89.320 147.260 4984.51 5071.65 2954.67 S 6108.74 E 5955781.88 N 618201.19 E 1.508 6772.48
10094.66 88.580 146.790 4985.36 5072.50 2993.58 S 6133.98 E 5955743.36 N 618227.00 E 1.890 6813.56
10144.03 88.830 146.410 4986.48 5073.62 3034.78 S 6161.15 E 5955702.57 N 618254.78 E 0.921 6857.46
10191.31 89.380 145.820 4987.21 5074.35 3074.03 S 6187.50 E 5955663.72 N 618281.72 E 1.706 6899.69
10239.79 88.830 143.210 4987.97 5075.11 3113.49 S 6215.64 E 5955624.68 N 618310.44 E 5.501 6943.58
10286.04 89.080 142.690 4988.81 5075.95 3150.40 S 6243.50 E 5955588.19 N 618338.85 E 1.247 6985.97
10334.62 89.380 142.190 4989.47 5076.61 3188.91 S 6273.11 E 5955550.13 N 618369.03 E 1.200 7030.67
10378.80 88.580 142.750 4990.25 5077.39 3223.94 S 6300.02 E 5955515.50 N 618396.46 E 2.210 7071.31
10428.37 88.890 141.820 4991.35 5078.49 3263.14 S 6330.34 E 5955476.76 N 618427.36 E 1.977 7116.96
10474.45 89.200 144.230 4992.12 5079.26 3299.95 S 6358.05 E 5955440.37 N 618455.61 E 5.272 7159.17
10523.73 89.510 144.830 4992.67 5079.81 3340.08 S 6386.64 E 5955400.67 N 618484.80 E 1.370 7203.78
10568.54 89.690 142.650 4992.98 5080.12 3376.21 S 6413.14 E 5955364.94 N 618511.84 E 4.881 7244.61
10617.37 90.060 144.230 4993.09 5080.23 3415.43 S 6442.23 E 5955326.15 N 618541.51 E 3.323 7289.20
10664.27 90.430 142.600 4992.89 5080.03 3453.08 S 6470.18 E 5955288.92 N 618570.02 E 3.564 7332.04
10713.22 90.800 142.430 4992.36 5079.50 3491.92 S 6499.96 E 5955250.53 N 618600.38 E 0.832 7377 .06
10759.66 91.050 140.580 4991.62 5078.76 3528.27 S 6528.87 E 5955214.62 N 618629.82 E 4.019 7420.08
10808.85 90.430 139.400 4990.98 5078.12 3565.94 S 6560.49E 5955177.42 N 618662.00 E 2.710 7466.12
10856.29 89.510 136.120 4991.00 5078.14 3601.05 S 6592.37 E 5955142.79 N 618694.41 E 7.181 7511.14
10905.04 88.770 135.440 4991.74 5078.88 3635.99 S 6626.37 E 5955108.36 N 618728.92 E 2.061 7557.90
10950.60 88.650 137.020 4992.76 5079.90 3668.88 S 6657.88 E 5955075.95 N 618760.91 E 3.477 7601.50
10999.94 89.570 135.770 4993.53 5080.67 3704.60 S 6691.90 E 5955040.74 N 618795.46 E 3.145 7648.68
11046.58 88.830 138.380 4994.18 5081.32 3738.74 S 6723.66 E 5955007.07 N 618827.73 E 5.816 7693.11
11095.58 88.280 139.060 4995.42 5082.56 3775.56 S 6755.97 E 5954970.74 N 618860.59 E 1.785 7739.33
11141.75 88.770 138. 920 4996.60 5083.74 3810.38 S 6786.26 E 5954936.37 N 618891.39 E 1.104 7782.82
~ ---" ------
- ----- ---"
8 July, 2002 - 15:58
Page 4 of6
DrillQuest 2.00.08.005
Sperry-Sun DrillitJJg Services
Survey ReportforW~3L2MWD
Your Ref: APISOtJ.308761
Job No. AKMW22078, SU1Vèiyèd: 8 June, 2002
.
BPXA
North Slope Alaska PBU_WOA W Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azlm. Depth Depth Northlngs Ealtlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
/~ 11189.26 88.830 138.920 4997.60 5084.74 3846.19 S 6817.47 E 5954901.03 N 618923.13 E 0.126 7827.59
11237.83 89.320 139.440 4998.38 5085.52 3882.94 S 6849.22 E 5954864.76 N 618955.42 E 1.471 7873.28
11271.01 89.510 138.740 4998.72 5085.86 3908.01 S 6870.95 E 5954840.01 N 618977.52 E 2.186 7904.52
11340.00 89.510 138.740 4999.31 5086.45 3959.87 S 6916.44 E 5954788.84 N 619023.79 E 0.000 7969.62 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
The Dogleg Severity is in Degrees per 100 feet" (US).
Vertical Section is from Well and calculated along an Azimuth of 119.400° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 11340.00ft.,
The Bottom Hole Displacement is 7969.80ft., in the Direction of 119.792° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
7079.14
7135.00
11340.00
5013.66
5037.00
5086.45
595.64 S
625.51 S
3959.87 S
4359.86 E
4400.87 E
6916.44 E
Tie On Point
Window Point
Projected Survey
------
8 July, 2002 - 15:58
Page 50'6
DrillQuest 2.00.08.005
Sperry-Sun Drilling Services
Survey Report for W",203L2 MWD
Your Ref: API 500292308761
Job No. AKMW22078, Surveyed: 8 June, 2002
.
North Slope Alaska
BPXA
PBU WOA W Pad
Survey tool program for W-203L2 MWD
,-
From To
Measured Vertical Measured Vertical
Depth Depth Depth Depth Survey Tool Description
(ft) (ft) (ft) (ft)
0.00
0.00 11340.00
5086.45 MWD Magnetic (W-203 MWD)
-- - ---. --~--------
8 July, 2002 - 15:58
Page 60'6
DrillQuest 2.00.08.005
),
J
AOGCC
Attn: Lisa Weepie
333 W. 7th Avenue, Suite 100
Anchorage, Alaska 99501
Definitive
Re: Distribution of Survey Data for Well W-203L2
Dear Sir I Madam:
Enclosed are 2 survey hard copy(s) and 1 disk.
Tie-on Survey:
Window I Kickoff Survey
Projected Survey:
7079.14 I MD
7135.00 I MD
11340.00 ' MD
)
~ 0;)- CfJ '7
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
,.JUL 1 7 2002
Alaska Oil & Gas Cons. Commissio
Anchorage n
0"'
Q?-
(J
,
~
'D
.JEF N - V":
/-
North S""-Alaska
SPB
PBU_WOA WPad, Slot W-203
W..203L2
Job No. AKZZ22078, Surveyed: 13 June, 2002
SURVEY REPORT
8 July, 1102
Your Ref: API 5OfI!92308761
Surface Coordinates: 5958645.16 N, 612049.08 E (70017' 45.4671- N, 149005' 33.6448" W)
Kelly Bushing: 87. 14ft above Mean Sea Level
---
~''''''''''.y~..,..,
DAIL.L.ING SIliRVh_&S
A HaIUburton Company
Survey Ref: 5vy11209
Sperry-Sun Drilllllg Services .
Survey Report rorW.203L2
Your Ref: API 5002B2308761
Job No. AKZZ2207B, Survéyed: 13 June, 2002
BPXA
North Slope Alaska PBU_WOA W Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azlm. Depth Depth Northlngs Eastlng. Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
,~ 7079.14 64.770 125.070 4926.46 5013.60 573.125 4364.17 E 5958137.16 N 616421.30 E 4083.47 Tie On Point
7135.00 65.830 126.870 4949.80 5036.94 602.93 S 4405.23 E 5958107.97 N 616462.81 E 3.489 4133.88 Window Point
7169.23 68.750 126.450 4963.01 5050.15 621.785 4430.56 E 5958089.50 N 616488.42 E 8.605 4165.20
7201.68 72.090 126.080 4973.89 5061.03 639.86 S 4455.21 E 5958071.79 N 616513.33 E 10.349 4195.55
7234.21 75.620 125.720 4982.93 5070.07 658.18 S 4480.52 E 5958053.85 N 616538.91 E 10.903 4226.59
7266.02 79.600 125.380 4989.76 5076.90 676.24 5 4505.79 E 5958036.17 N 616564.45 E 12.555 4257.48
7297.59 83.020 125.050 4994.52 5081.66 694.23 5 4531.28 E 5958018.56 N 616590.21 E 10.882 4288.52
7328.35 86.550 127.230 4997.32 5084.46 712.30 S 4556.02 E 5958000.86 N 616615.21 E 13.472 4318.93
7363.30 90.920 127.720 4998.09 5085.23 733.55 5 4583.74 E 5957980.02 N 616643.25 E 12.582 4353.52
7396.16 93.690 132.950 4996.77 5083.91 754.79 S 4608.76 E 5957959.16 N 616668.58 E 17.998 4385.74
7424.08 94.250 136.530 4994.84 5081.98 774.39 S 4628.54 E 5957939.85 N 616688.65 E 12.948 4412.60
7473.57 93.570 139.370 4991.46 5078.60 811.055 4661.60 E 5957903.69 N 616722.26 E 5.888 4459.40
7519.45 93.510 139.490 4988.63 5075.77 845.84 S 4691.39 E 5957869.35 N 616752.56 E 0.292 4502.43
7554.77 94.000 139.610 4986.31 5073.45 872.66 5 4714.25 E 5957842.88 N 616775.82 E 1.428 4535.51
7586.67 93.820 139.620 4984.14 5071.28 896.90 S 4734.87 E 5957818.95 N 616796.80 E 0.565 4565.38
7615.33 93.880 139.260 4982.21 5069.35 918.63 5 4753.47 E 5957797.50 N 616815.71 E 1.271 4592.24
7661.38 89.570 137.840 4980.83 5067.97 953.125 4783.93 E 5957763.47 N 616846.69 E 9.854 4635.71
7710.94 88,890 137.950 4981.49 5068.63 989.88 S 4817.16 E 5957727.20 N 616880.46 E 1.390 4682.71
/- 7756.84 89.140 139.010 4982.28 5069.42 1024.24 S 4847.58 E 5957693.30 N 616911.39 E 2,372 4726.08
7806.47 89.570 139.820 4982.84 5069.98 1061.93 S 4879.86 E 5957656.10 N 616944.23 E 1.848 4772.71
7850.75 88.890 141.720 4983.44 5070.58 1096.23 S 4907.86 E 5957622.22 N 616972.74 E 4.557 4813.94
7902.04 89.450 144.540 4984.18 5071.32 1137.255 4938.63 E 5957581.66 N 617004.12 E 5,605 4860.88
7952.36 89.320 146.420 4984.72 5071.86 1178.71 5 4967.14 E 5957540.64 N 617033,24 E 3.745 4906.07
7997.28 89.570 147.360 4985.16 5072.30 1216.335 4991.68 E 5957503.38 N 617058.34 E 2.165 4945.92
8044.63 89.880 147.710 4985.38 5072.52 1256.28 S 5017.10 E 5957463.82 N 617084.35 E 0.987 4987.68
8092.98 90.060 148.160 4985.41 5072.55 1297.25 S 5042.76 E 5957423.23 N 617110.62 E 1.002 5030.15
8139.86 91.350 149.110 4984.83 5071.97 1337.285 5067.16 E 5957383.57 N 617135.61 E 3.417 5071.06
8188.87 91.660 148.920 4983.54 5070.68 1379.28 5 5092.38 E 5957341.95 N 617161.46 E 0.742 5113.65
8234.32 90.980 148.050 4982.50 5069.64 1418.01 5 5116.13E 5957303.57 N 617185.79 E 2.429 5153.36
8284.58 89.940 146.440 4982.09 5069.23 1460.28 S 5143.33 E 5957261.72 N 617213.60 E 3.813 5197.79
- ----- -~-- --
8 July, 2002 - 15:48
Page 2 of6
DrillQuest 2.00.08,005
Sperry-Sun Dril- Services .
Survey RepòrtforW-203L2
Your Ref: API 509292308161
Job No. AKZZ22078. Surveyed: 13 June, 2002
BPXA
North Slope Alaska PBU WOA W Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northlngs Eastlngs Rate SectIon Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
/-.. 8329.96 90.370 146.650 4981.97 5069.11 1498.14 S 5168.34 E 5957224.24 N 617239.18 E 1.055 5238.17
8379.32 89.200 145.780 4982.16 5069.30 1539.168 5195.79 E 5957183.63 N 617267.24 E 2.954 5282.23
8424.68 89.450 145.660 4982.69 5069.83 1576.64 8 5221.34 E 5957146.53 N 617293.34 E 0.611 5322.88
8473.28 90.060 145.780 4982.90 5070.04 1616.808 5248.71 E 5957106.79 N 617321.31 E 1.279 5366.44
8518.71 89.880 144.420 4982.92 5070.06 1654.06 S 5274.70 E 5957069.92 N 617347.85 E 3.020 5407.38
8569.67 90.490 145.590 4982.76 5069.90 1695.80 S 5303.93 E 5957028.62 N 617377.70 E 2.589 5453.33
8616.27 89.690 144.540 4982.68 5069.82 1734.01 8 5330.61 E 5956990.82 N 617404.95 E 2.833 5495.33
8663.58 90.250 144.320 4982.71 5069.85 1772.49 S 5358.13 E 5956952.75 N 617433.04 E 1.272 5538.20
8708.33 89.510 144.860 4982.80 5069.94 1808.96 S 5384.06 E 5956916.67 N 617459.51 E 2.047 5578.69
8759.10 89.940 144.880 4983.05 5070.19 1850.48 S 5413.27 E 5956875.59 N 617489.34 E 0.848 5624.53
8808.82 90.430 144.310 4982.89 5070.03 1891.01 8 5442.08 E 5956835.49 N 617518.75 E 1.512 5669.52
8853.91 90.990 144.230 4982.33 5069.47 1927.61 S 5468.41 E 5956799.29 N 617545.62 E 1.255 5710.42
8901.25 90.550 143.590 4981.69 5068.83 1965.86 8 5496.29 E 5956761.46 N 617574.07 E 1.640 5753.49
8949.27 90.370 143.370 4981.31 5068.45 2004.45 S 5524.87 E 5956723.30 N 617603.22 E 0.592 5797.33
8998.96 89.290 141.590 4981.45 5068.59 2043.86 S 5555.13 E 5956684.35 N 617634.06 E 4.190 5843.04
9045.11 89.510 141.700 4981.94 5069.08 2080.04 8 5583.76 E 5956648.59 N 617663.23 E 0.533 5885.75
9093.34 88.460 142.070 4982.79 5069.93 2117.98 S 5613.53 E 5956611.10 N 617693.56 E 2.308 5930.31
9140.34 88.650 141.840 4983.98 5071.12 2154.99 8 5642.49 E 5956574.53 N 617723.06 E 0.635 5973.70
9187.28 89.010 141.090 4984.93 5072.07 2191.708 5671.72 E 5956538.26 N 617752.85 E 1.772 6017.19
9235.81 89.380 141.020 4985.62 5072.76 2229.44 S 5702.22 E 5956500.98 N 617783.91 E 0.776 6062.29
9282.33 90.000 141.750 4985.87 5073.01 2265.78 S 5731.26 E 5956465.07 N 617813.48 E 2.059 6105.43
9330.87 90.740 142.220 4985.55 5072.69 2304.02 S 5761.15 E 5956427.28 N 617843.94 E 1.806 6150.25
9379.94 91.050 142.880 4984.79 5071.93 2342.98 S 5790.98 E 5956388.78 N 617874.35 E 1.486 6195.36
9426.38 90.250 142.630 4984.26 5071.40 2379.94 S 5819.09 E 5956352.23 N 617903.00 E 1.805 6237.99
9475.43 90.550 142.110 4983.92 5071.06 2418.79 S 5849.03 E 5956313.84 N 617933.52 E 1.224 6283.15
9523.05 90.800 141.810 4983.36 5070.50 2456.29 S 5878.38 E 5956276.78 N 617963.42 E 0.820 6327.12
9571.16 90.980 141.830 4982.61 5069.75 2494.10 S 5908.11 E 5956239.41 N 617993.72 E 0.376 6371.59
9616.87 90.1 20 142.470 4982.17 5069.31 2530.19 S 5936.16 E 5956203.74 N 618022.30 E 2.345 6413.74
9666.03 89.880 143.370 4982.17 5069.31 2569.41 S 5965.80 E 5956164.97 N 618052.52 E 1.895 6458.82
9713.09 89.690 144.600 4982.35 5069.49 2607.48 8 5993.47 E 5956127.32 N 618080.75 E 2.645 6501.61
8 July, 2002 - 15:48
Page 30f6
DrillQuest 2.00.08.005
Sperry-Sun Drilling Services .
Survey Report forW-203L2
Your Ref: API 5tJtI2Ø2308761
Job No. AKZZ22078~ Surveyed: 13 June~ 2002
BPXA
North Slope Alaska PBU_WOA W Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
9761.87 90.180 145.270 4982.40 5069.54 2647.405 6021.49 E 5956087.82 N 618109.37 E 1.702 6545.63
9808.74 90.000 145.130 4982.33 5069.47 2685.89 S 6048.24 E 5956049.74 N 618136.69 E 0.487 6587.82
- 9857.95 89.450 145.370 4982.57 5069.71 2726.32 S 6076.29 E 5956009.73 N 618165.34 E 1.219 6632.11
9904.03 89.880 145.670 4982.84 5069.98 2764.31 S 6102.38 E 5955972.14 N 618191.99 E 1.138 6673.48
9952.63 89.080 145.730 4983.28 5070.42 2804.45 S 6129.76 E 5955932.40 N 618219.97 E 1.651 6717.05
10000.31 89.390 145.660 4983.91 5071.05 2843.84 5 6156.63 E 5955893.42 N 618247.42 E 0.667 6759.79
10048.28 89.320 145.630 4984.45 5071.59 2883.44 5 6183.70 E 5955854.23 N 618275.08 E 0.159 6802.81
10094.66 88.580 145.210 4985.30 5072.44 2921.61 S 6210.02 E 5955816.45 N 618301.96 E 1.835 6844.49
10144.03 88.830 145.020 4986.42 5073.56 2962.10 S 6238.25 E 5955776.39 N 618330.79 E 0.636 6888.95
10191.31 89.380 145.270 4987.16 5074.30 3000.905 6265.27 E 5955738.00 N 618358.39 E 1.278 6931.54
10239.79 88.830 143.920 4987.91 5075.05 3040.405 6293.35 E 5955698.92 N 618387.06 E 3.007 6975.40
10286.04 89.080 144.030 4988.76 5075.90 3077.80 S 6320.54 E 5955661.93 N 618414.81 E 0.591 7017.45
10334.62 89.380 143.560 4989.41 5076.55 3117.005 6349.24 E 5955623.16 N 618444.08 E 1.148 7061.69
10378.80 88.580 143.620 4990.20 5077.34 3152.55 S 6375.46 E 5955588.01 N 618470.83 E 1.816 7101.98
10428.37 88.890 144.580 4991.29 5078.43 3192.695 6404.52 E 5955548.30 N 618500.48 E 2.035 7147.01
10474.45 89.200 144.700 4992.06 5079.20 3230.27 5 6431.18 E 5955511.13 N 618527.70 E 0.721 7188.68
10523.73 89.510 145.110 4992.61 5079.75 3270.59 S 6459.51 E 5955471.24 N 618556.63 E 1.043 7233.16
10568.54 89.690 145.130 4992.93 5080.07 3307.34 5 6485.13 E 5955434.86 N 618582.80 E 0.404 7273.53
10617.37 90.060 145.520 4993.03 5080.17 3347.50 5 6512.91 E 5955395.13 N 618611.18 E 1.101 7317.44
1.....,.........," 10664.27 90.430 144.740 4992.83 5079.97 3385.98 5 6539.73 E 5955357.05 N 618638.56 E 1.841 7359.69
10713.22 90.800 144.130 4992.31 5079.45 3425.80 5 6568.20 E 5955317.66 N 618667.62 E 1.457 7404.04
10759.66 91.050 142.220 4991.56 5078.70 3462.96 5 6596.03 E 5955280.92 N 618696.00 E 4.147 7446.53
10808.85 90.430 140.250 4990.92 5078,06 3501.31 5 6626.82 E 5955243.03 N 618727.36 E 4.198 7492.19
10856.29 89.510 137.860 4990.95 5078.09 3537.14 S 6657.91 E 5955207.67 N 618758.98 E 5.398 7536.86
10905.04 88.770 137.000 4991.68 5078.82 3573.04 5 6690.88 E 5955172.27 N 618792.49 E 2.327 7583.21
10950.60 88.650 136.050 4992.71 5079.85 3606.09 5 6722.22 E 5955139.68 N 618824.31 E 2.101 7626.74
10999.94 89.570 136.420 4993.4 7 5080.61 3641.725 6756.34 E 5955104.57 N 618858.96 E 2.010 7673.96
11046.58 88.830 137.090 4994.12 5081.26 3675.69 S . 6788.29 E 5955071.08 N 618891.42 E 2.140 7718.47
11095.58 88.280 138.280 4995.36 5082.50 3711.91 5 6821.27 E 5955035.35 N 618924.93 E 2.675 7764.98
11141.75 88.770 138.510 4996.55 5083.69 3746.42 S 6851.92 E 5955001.30 N 618956.09 E 1.172 7808.62
- -.--------------- ------
------" ----" - -- -
8 July, 2002 . 15:48
Page 4 of 6
DrillQlIest 2.00.08.005
Sperry-Sun Dr_gServices
Survey Repørttgt;¡~.~L2
Your Ref: AP,5t1tIB23l1B761
Job No. AKZZ22078, SUI1IeYéd: 13 June, 2002
.
BPXA
North Slope Alaska PBU_WOA W Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azlm. Depth Depth Northlngs Eastlngs Northlngs Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
11189.26 88.830 138.830 4997.54 5084.68 3782.09 S 6883.29 E 5954966.10 N 618987.98 E 0.685 7853.46
11237.83 89.320 137.870 4998.33 5085.47 3818.38 S 6915.56 E 5954930.30 N 619020.80 E 2.219 7899.39
~-='~ 11271.01 89.510 137.880 4998.67 5085.81 3842.99 S 6937.81 E 5954906.03 N 619043.41 E 0.573 7930.86
11340.00 89.510 137.880 4999.26 5086.40 3894.16 S 6984.08 E 5954855.55 N 619090.44 E 0.000 7996.29 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from Well and calculated along an Azimuth of 119.400° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 11340.00ft.,
The Bottom Hole Displacement is 7996.37ft., in the Direction of 119.143° (True).
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
7079.14
7135.00
11340.00
5013.60
5036.94
5086.40
573.12 S
602.93 S
3894.16 S
4364.17 E
4405.23 E
6984.08 E
Tie On Point
Window Point
Projected Survey
---------~
------~.-
8 July, 2002. 15:48
Page 5 0'6
DrillQup-st 2.00.08.005
North Slope Alaska
Survey tool program for W-203L2
I'=o-~
From To
Measured Vertical Measured Vertical
Depth Depth Depth Depth
(ft) (ft) (ft) (ft)
Sperry-Sun Drilling Services
Survey Report for W-203L2
Your Ref: API 5OO29230B761
Job No. AKZZ2207B, SUfVeyed: 13 June, 2002
.
BPXA
PBU_WOA W Pad
Survey Tool Description
0.00
0.00 11340.00
5086.40 AK-6 BP _IFR-AK (W-203)
~
8 July, 2002 - 15:48
.---------
---~-------- - -
Page 60f6
DrillQlIest 2.00.08.005
'1"
~
:t,
~r!Æ~E (DJÍ !Æl!Æ~~~!Æ
I
I
!
AI1ASIiA OIL AND GAS
CONSERVATION COMMISSION
j
/
i
.I
i
i
i
¡
!
TONY KNOWLES, GOVERNOR
333 W. -¡rn AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Lowell Crane
Senior Drilling Engineer
BP Exploration (Alaska), Inc
PO Box 196612
Anchorage AK 99519
Re:
Prudhoe Bay Unit W -203L2
BP Exploration (Alaska), Inc
Permit No: 202-099
Sur Loc: 3668' NSL, 1197' WEL, Sec. 21, T11N, R12E, UM
Btmhole Loc. 5017' NSL, 4795' WEL, Sec. 26, T11N, R12E, UM
Dear Mr. Crane:
Enclosed is the approved application for permit to drill the above referenced well.
The permit to drill does not exempt you from obtaining additional permits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are måde.
The permit is for a new wellbore segment of existing well PBU W-203, Permit No 202-097, API
50-029-23087-00. Production should continue to be reported as a function of the original API
number stated above.
Annular disposal has not been requested as part of the Permit to Drill application for Prudhoe
Bay Unit W -203L2.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to witness a test of BOPE installed prior to drilling new hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Sincerely,
( ¡J A1A J~~ . ^/ ~ < ~ 11~1IIA .
C~~~ðechsli Tayl~;--ðL/
Chair
BY ORDER OF THE COMMISSION
DATED this~ day of May, 2002
cc:
Department ofFish & Game, Habitat Section wlo encl.
Department of Environmental Conservation wlo encl.
W()I\- S( 2-{O"l.
Hole
6-1/8"
; STATE OF ALASKA "
ALASKA O~L .'\NO GAS CONSERVATION COMMISl. IN
PERMIT TO DRILL
20 MC 25.005
1 b. Type of well 0 Exploratory 0 Stratigraphic Test 1m Development Oil
0 Service 0 Development Gas 0 Single Zone 1m Multiple Zone
5. Datum Elevation (OF or KB) 1°. Field and Pool
Plan KBE = 86.90' Prudhoe Say Field / Polaris
6. ~~er!Y Designation Pool (Undefined)
~Zr&./;~1 ADL 028264 ~ b
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number i
W-203L2 /
9. Approximate spud date
05/19/02 Amount $200,000.00
14. Number of acres in property 15. Proposed depth (MD and TVD)
2560 11313' MD / 5067' TVD
0 17. Anticipated pressure {s;7'20 AAC 25.035 (e) (2)}
92 Maximum surface 1694 psig, Attotal depth (TVD) 5100' /2281 psig
Setting Depth
Top Bottom Quantitv of Cement
Lenqth MD TVD MD TVD (include staae data)
4222' 7093' 5047' 11313' 5067' Uncemented Slotted Liner ./
(Multilateral)
1 a. Type of work 1m Drill 0 Redrill
0 Re-Entry 0 Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
3668' NSL, 1197' WEL, SEC. 21, T11 N, R12E, UM
At top of productive interval
2456' NSL, 1536' WEL, SEC. 22, T11 N, R12E, UM
At total depth
5017' NSL, 4795' WEL, SEC. 26, T11 N, R12E, UM
12. Distance to nearest property line 13. Distance to nearest well
ADL 047451,262' MD No Close Approach
16. To be completed for deviated wells
Kick Off Depth 7093' MD Maximum Hole Angle
18. Casin~ Program Specifications
Size
Casina Weiaht Grade Couplina
4-1/2" 12.6# L-80 1ST
11. Type Bond (See 20 AAC 25.025)
(OBa)
Number 2S 100302630-277
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
11330 feet
5192 feet
feet
feet
Plugs (measured)
Junk (measured)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
Size
Cemented
MD
TVD
7"
260 sx Arctic Set (Approx.)
630 sx PF 'L', 274 sx Class 'G'
356 sx Class 'D-600G' Latex
114'
3996'
RECÉ71\tED
114'
3197'
5203'
80'
3958'
7716'
20" X 34"
9-5/8"
APP 7\ 0 20n?
f1. I'" \.... ",...t...
Perforation depth: measured
None
Alaska Oil & G~¡.£ G(Jí~S, LOHU¡USS.U}~
AnchoraQe
true vertical
None
1m Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch 1m Drilling Program
II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25,050 Requirements
Prepared By Name/Number: Terrie Hubble, 564-4628
20. Attachments
21. I hereby certify that the for oing is true and correct to the best of my knowledge
Sig~:~~~n ~~n~,.~,fSi ;..:,.."...,~~~~~~~i~~:D,~lli~~.;~;;.~~~~ .' ',i"" .' ,~a~e,~~ 2-/-: 2 J:;
, ",'.;1" ". ',',..,",", '\i." ',i,I;)I,,;' ,""\',II":;II:",'I","!,":I/;:",':';;",:':;:,I"!,Ç:,lmm"tf'A"!::Y~'i':t¡h1~lt,,:"::";':';:I;,~,~,,:,::,.., ,.,'::,1;:;" .:,' '.', ,'¡'I!:I', , ":,' ,'. !I' ,'."', "" ,. " ,',.,"
Permit Numþer ~Q API Numg.er . .' 3 87 ",- / I ~roval Cate See cover lett.er
2.0 2---- L.TI 1 50- () Z"í'- 2.- 0 . co .) l P (9?-- for other reqUirements
Conditions of Approval: Samples Required 0 Yes (S'NO Mud Log Required '\ 0 Yes ~No
Hydrogen Sulfide Measures 0 Yes ~No Directional Survey Required ~ Yes 0 No
Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K ~.5K psi~'
Other:
~l order of
Ctr~itß \ N A tmission
Date ~J to Ó?-.-
Submit In Triplicate
Approved By . Onglnal Signed H)¡
Form 10-401 Rev. 12-01-85 Cammy Oechsli Tay'o
Greater Prudhoe Bay Polaris W-203 Permit
1. Well Plan Sum/..arv
(
Well Name: W-203 & W-203L 1 & W-203L2
I Type of Well (producer or injector):
I Producer (Multilateral) I
Surface Location:
W-203 OBd Target Start:
W-203 OBd Target End:
W-203 L 1 OBc Target Start:
W-203 L 1 OBc Target End:
W-203 L 1 Oba Target Start:
W-203 L 1 Oba Target End:
I AFE Number:
I 5M1056
3,668' FSL, 1,1971 FEL, Sec. 21, T11 N, R12E
X = 612,049.02 Y = 5,958,645.07
2,4561 FSL, 1,5361 FEL, Sec. 22, T11 N, R12E
X = 617,009.00 Y = 5,957,509.00 Z = 5,125' TVDss
5,017' FSL, 4,7951 FEL, Sec. 26, T11N, R12E
X = 619,076.00 Y = 5,954,823.00 Z = 5,105' TVDss
2,4561 FSL, 1,5361 FEL, Sec. 22, T11 N, R12E
X = 617,009.00 Y = 5,957,509.00 Z = 5,060' TVDss
5,017' FSL, 4,7951 FEL, Sec. 26, T11 N, R12E
..~ ~.~~.?.!.:976.~~..,.:..= .~~~?~,~~.3:00 ~ .=..S..,95.~'.~X~s~.
2,4561 FSL, 1,5361 FEL, Sec. 22, T11 N, R12E
X = 617,009.00 Y = 5,957,509.00 Z = 4,985' TVDss
5,017' FSL, 4,7951 FEL, Sec. 26, T11N, R12E
X = 619,076.00 Y = 5,954,823.00 Z = 4,980' TVDss
I Rig: I Doyon 14
I
I
86.90' I
I Estimated Start Date: I May 19th 2002 I
I Operating days to complete: I 40.14
OBa MD
OBc MD
OBd MD
Well Design:
Scope of Work:
11,313'
11,324'
11,330'
Oba TVDrkb: TD 5,067 OBa Max Inc. 92° I KBE I
OBc TVDrkb: TD 5,142 OBc Max Inc. 91 °
Obd TVDrkb: TD 5,192 OBd Max Inc. 90°
USH grassroots multi-lateral with extended horizontal laterals. 4-%" Gas Lift / Jet
Pump completion.
Surface Hole (5" DP):
. Drill 12-1/4" Surface hole to:t 3,996' MD just below the SV1 sand
. Run and cement 9-5/8" casing to surface. Conduct FIT: 11.6 ppg EMW
Intermediate Hole (0/0" DP):
. Drill 8 %" int. hole to:t 7,750' MD. Land int. hole in OBd reservoir @ :t84°.
. Run and cement 7" casing. Conduct FIT: 12 ppg EMW
Production Hole(Lat #1 (3-%" DP):
. Drill out shoe and drill a 6-1/8",3,577' horizontal lateral in OBd.
. Run 4 Y2" slotted liner with hanger and liner top packer.
Production Hole(Lat #2):
. Run whipstock to top of OBc interval at:t 7,343' MD. Mill window in 7" casing.
. Drill a 6-1/8", 3,983' horizontal well in the OBc. Pull Whipstock.
. Run 4 %" slotted liner with Backer Hook Hanger.
Production Hole{Lat #3):
. Run whipstock to top of OBa interval at:t 7,093' MD. Mill window in 7" casing.
. Drill a 6-1/8", 4,222' horizontal well in the OBa. Pull Whipstock.
. Run 4 %" slotted liner with Backer Hook Hanger.
Completion:
. Complete well with a 4-%" tubing Gas Lift I Jet Pump completion.
Version #2, 4/29/2002
Greater Prudhoe Bay Polaris W-203 Permit
2. Current Wellln("~rmation
2.1 General
Well Name:
API Number:
Well Type:
Current Status:
BHP:
BHT:
2.2 Mechanical Condition
W -203:
Doyon 14:
Conductor:
2.3 Target Estimates
('
W -203
Development - Polaris Schrader Bluff Multilateral Producer
New well, 20" X 34" insulated conductor to be set
2,250 psi @ 5,025' TVDss (8.6 ppg EMW). Normal pressure gradient.
80°F @ 5,025' TVDss Estimated (SOR)
Cellar Box above MSL = 52.9'
KB I MSL = 34.0'
20" X 34", 215.5 I bItt, A53 ERW set at 114' RKB
Estimated Reserves: 4,306 mstb (primary), 6,191 mstb (primary + WF)
Expected Initial Rate: 3,575 stbld
Expected 6 month avg: 2,915 stbld
2.4 Materials Needed
Surface Casing:
Intermediate Casing:
3 x Production Liners:
L-80 Completion:
4,000'
1 each
1 each
30 each
1 assembly
1 each
1 lot
~
~ch
1 each
6 each
39 each
2 each
48 each
2 lots
3 each
9-%", 40#, L-80 BTC Casing
9-%", BTC Float Shoe and Float Collar
9-%",40#, BTC Type TAM Port Collar
9-%" x 12 %" Bow Spring Centralizers
FMC 11" 5m Gen 5 Wellhead System
9-%" TAM Port Collar
9-%" casing pups 5', 10', 20'.
7" 26# L-80 BTC-M Casing
7" BTC-M Float Shoe and Float Collar
7" 26# BTC-M Type IIHI ES cementer
7" x 8-V2" Steel In-Line Centralizers
7" x 8 V2" Bow Spring Centralizers
7" x 8 V2" Rigid Straight Blade Centralizers
7" Stop collars
7" casing pups 5', 10', 20'
7" casing RA tags
11 ,800'
400 each
7" x 4 V2"
4 V2"
2 assemblies
1 each
2 each
4 V2", 12.6#, L-80, IBT-Mod Slotted Liner
4 V2" x 5 3,4" x 8" Straight Blade Centralizers
Baker ZXP Liner Top Packer
Baker guide shoe with pack off bushing
Baker Level 3 Hookwall Hangers
Baker SC1 Retrievable packer
Halliburton XN-Nipple (3.725" 10)
4 V2" 12.6 I bItt , L-80, BTC-M tubing
Baker PRM Packer 7" X 4- V2"
4-V2" Halliburton XD Durasleeve
Halliburton X-Nipple (3.813" 10)
Cameo 4-V2" X 1" KBG2 Gas Litt Mandrels
11" X 4-V2" FMC tubing hanger
4-1/16", 5m Cameron Tree
7,000'
1 each
1 each
3 each
3 each
1 each
1 each
2
3. Drillina proaran\ Jverview
3.1. Surface and Anti-Collision Issues
Greater Prudhoe Bay Polaris W-203 Permit
('
Surface Shut-in Wells: No wells need to be shut-in for the rig move on and oft W-203.
Close Approach Wells: There are NO close approach wells associated with this profile.
Well Name
Current
Status
N/A
Production Priority
N/A
N/A
3.2. Well Control
Expected BHP
2,281 psi @ 5,100'
TVDss (estimated)
Max Exp Surface Pressure
1 ,694 psi ,/
(0.115 psi/ft gas gradient)
3.3. Mud Program
121A" Surface Hole Mud Properties:
Density (ppg) Funnel vis
8.6 - 9.2 150 - 300
VP
25 - 48
8 %" Intermediate Hole Mud Properties:
Density (ppg) Funnel vis VP
8.6 - 9.2 45 - 55 21 - 28
6 %" Production Hole Mud Properties: OBa/OBc/OBd
Density (ppg) Chlorides VP
9.2 20,000 ppm 22 - 27
Precautions
N/A
BOPE Rating
5,000 psi WP
(entire stack & valves)
Planned BOPE Test Pres.
3,500/250 psi Rams & Valves
2,500/250 psi Annular
I Spud - Freshwater Mud (PHPA)
Tauo PH API Filtrate
5 - 8 8.5 - 9.5 < 15
Freshwater Mud (PHPA)
Tauo PH API Filtrate
3 - 6 8.5 - 9.5 < 5
KCL - BaraDril-N Mud
MBT pH HTHP @100°
<4 8.0 - 8.5 < 10
LG Solids
<6.5
LG Solids
<20
LG Solids
< 12 ppb
NOTE: See attached Baroid mud recommendation
LCM Restrictions: No Organic LCM products in the Schrader Bluff formation
Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to DS-4 disposal site
Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste.
Exempt liquid wastes can be taken to D8-4 or Phillips KRU 1 R.
3
Greater Prudhoe Bay Polaris W-203 Permit
3.4. Formation Markers ( (
Formation Tops ft MD ft TVDss ft TVD Pore psi EMW (ppg) Hydrocarbons
SV5 2,034 1,820 1,907 819 8.7
Base Permafrost 2,071 1,850 1,937 833 8.7
SV4 2,197 1,950 2,037 878 8.7
SV3 3,034 2,500 2,587 1,125 8.7 Poss. Hydrates
SV2 3,318 2,680 2,767 1,206 8.7 Poss. Hydrates
SV1 3,838 3,010 3,097 1,355 8.7 Poss. Hydrates
UG4 4,343 3,330 3,417 1 ,499 8.7
UG4A 4,422 3,380 3,467 1,521 8.7 Poss. Heavy Oil
UG3 5,005 3,750 3,837 1,688 8.7 Poss. Heavy Oil
Fault 1 4,185 N/A
Ma 6,172 4,490 4,577 2,021 8.7 Poss. Heavy Oil
Mb1 6,269 4,550 4,637 2,048 8.7 Poss. Heavy Oil
Mb2 6,361 4,605 4,692 2,072 8.7 Poss. Wet
Mc 6,456 4,660 4,747 2,097 8.7 Poss. Wet
Fault 2 4,745 N/A
Na Faulted N/A Poss. Heavy Oil
Nb Faulted N/A Poss. Wet
Nc 6,741 4,810 4,897 2,185 8.7 Oil
OA 6,940 4,900 4,987 2,195 8.6 Wet
OBa 7,092 4,960 5,047 2,225 8.6 Oil
OBb 7,208 5,000 5,087 2,235 8.6 Oil
OBc 7,343 5,040 5,127 2,242 8.6 Oil
OBd 7,620 5,100 5,187 2,281 8.6 Oil
OBe Not Reached 5,165 N/A 2,310 8.6 N/A
3.5. CasingfTubing Program
Hole Size Csgl WtlFt Grade Conn Length Top Bottom
Tbg O.D. MD I TVDrkb M D I TVDrkb
48" 20" X 34" 215.5# A53 Welded 80' 34' / 34' 114' / 114'
12-%" 9-%" 40# L-80 BTC 3,958' 34' / 34' 3,996' /3,197'
8-3,4" 7" 26# L-80 BTC-M 7,716' 34' / 34' 7,750' /5,203'
6 }fa" OBa 4 Y2" Slotted 12.6# L-80 IBT 4,222' 7,093' / 5,047' 11,313' / 5,067'
6 %" OBc 4 Y2" Slotted 12.6# L-80 IBT 3,983' 7,343/5,127 11,324/5,142'
6 }fa" OBd 4 Y2" Slotted 12.6# L-80 IBT 3,677' 7,650' / 5,192' 11 ,330' / 5,192'
Tubing 4 Y2" GL 12.6# L-80 I BT -Mod 6,966' 34' / 34' 7,000' /5,013'
4
{
3.6. Cement Calculations'
Greater Prudhoe Bay Polaris W-203 Permit
(
Casin~ Size 19-%-in 40-lb/ft L-80 BTC - Single Stage
Basis 1250% excess over gauge hole in permafrost interval, 30o/Q excess over gauge hole below permafrost
Total Cement Volume: Tam Port collar located at 1,000' as a contingency for cement to surface
Wash 10 bbls CW100
Spacer 75 bbls of Viscosified Spacer weighted to 10.20 ppg
Lead 498 bbls (630 sks) 10.7Ib/gal Permafrost L cement - 4.44 cuft/sk
Tail 57 bbls (274 sks) 15.8 Ib/gal Class G + adds - 1.17 cuft/sk
Temp I BHST == 60° F from SOR, BHCT 80° F estimated by Dowell
Casin~ Size 17" 26lb/ft L-80 BTC-M - Single Stage
Basis I 30% excess - TOC: 500' MD above the Ma sands (planned TMa: 6,168' MD) => 5,668' MD
Total Cement Volume: Wash 20 bbls CW100
Spacer 50 bbls of Viscosified Spacer (Mud push XL Design) Weighted to 10.6 ppg
Tail 74 bbls 10.7 Class D-600G Latex
Temp BHST == 80° F from SOR, BHCT 85° F estimated by Dowell
3.6.1. 9-%" Casing Centralizer Placement
a) Run (25) 9-%" Bow-spring centralizers floating in the middle of each joint of casing from the
casing shoe up to 2,996' MD (1,000' MD above the shoe).
b) Run 2 Bow-spring centralizers on either side of the TAM Port Collar.
c) The centralizer program is subject to change pending actual hole conditions.
3.6.2. 7" Casing Space Out
a) Space 7" casing out with pups and long/short joints as required to place the top of a long full joint
at the actual top of each sand to allow for the window to be milled just below the top of each
sand and in the middle of a full joint of casing.
b) Place 1 RA tag above the first window, 1 RA tag above the second window, and 1 RA tag above
the third window.
c) Emergency 7" casing slips can be used instead of the 7" mandrel hanger if required for space
out.
3.6.3. 7" String Centralizer Placement
a) Do not run centralizers on the window joints spaced at the top of each sand.
b) Run one in-line centralizer above and below each window joint.
c) Place 2 centralizers rigid straight blade centralizers back to back at the very bottom of the shoe
joint. Do not run any centralizers on the next two full joints (see illustration at the end of the
wef/plan) .
d) With the exception stated above, alternate 1 bow spring cenralizer floating across a full joint and
2 bow spring centralizers, one floating on the upper half of the joint and one floating on the lower
half of the joint separated by a stop collar up to 5,668' MD (500' MD above Ma sand). Zonal
isolation with cement is required between the top of the OBa and base of the OA sands. The
centralizer program is subject to change pending modeling and hole conditions. See attached
drawing.
3.6.4. 4 %" Slotted Liner Centralizer Placement
a) Run one straight blade rigid centralizer per joint with no stop collar (i.e. free floating across the
whole length of the joint) for the whole string.
5
Greater Prudhoe Bay Polaris W-203 Permit
3.7. Survey and Logging pl""dram
(
12-"A" Hole Section:
Open Hole: MWD I GR
Cased hole: None
- , -, I
8-%" Hole Section: MWD I GR I Res I PWD I Den I Neu
Cased Hole: USIT ,~,~~~.~~~., .. h
6 Va" Hole Sections: MWD I GR I Res I PWD I Den I Neu I ABII ABGR - (ABGR will be run if available)
Cased Hole: None
3.8. Bit Recommendations
BHA
Number
Surface
Interm.
OBa lat.
OBc lat.
Obd lat.
Hole Size
and Section
12-%"
8-%
6%"
6%"
6%"
Depths (MD)
Bit Type
Nozzles
K-Revs Hours
0' - 3,996'
3,996' - 7,750'
7,750' -11,330'
7,338' - 11 ,324'
7,088' -11,313'
Smith FGXi (Twist & Shout)
TBD
TBD
TBD
TBD
3.9. Motors and Required Doglegs
BHA No. Motor Size and Motor Required Flow Rate RPMs Required Doglegs
1 8" Sperrydrill 6/7, 4 stg Mud Motor, 1.5° adj. with 400 - 650 60-120 1.5°- 2.5°/100' initial build
12" screw on stabilizer gpm 4°/100' final build
2 7" Sperrydrill 7/8, 6 stg FTC Performanc motor, 500 - 600 60-120 3.5°/100' build
with 1.22° adj. with 8.6" concentric sleeve gpm to horizontal
3&4 4 %" Sperrydrill 4/5, 6.3 stg FTC Performance, 250-275 60-100 Maximum build = 12°/100'
1.5° adj with 5.8" concentric sleeve and ABI gpm out of window
6
{ (
W-203 Riç,site Drillinç, Hazards and Continç,encies
. POST THIS NOTICE IN THE DOGHOUSE
I. Well Control
A. The Schrader Bluff in this fault block is expected to be normal pressured at 8.6 ppg EMW. This
pressure is estimated based on the initial static on W -200 (Dec-99). .
II. Hydrates and Shallow gas
A. Hydrates have not been a significant issue thus far on W-Pad during the recent drilling of W-211 and
W-212, however there is always a potential.
III. Lost Circulation/Breathing
A. Lost circulation is unlikely.
B. Breathing will not be an issue as we are not drilling below the Schrader Bluff.
IV. Kick Tolerance/Integrity Testing
A. The 9-%" casing will be cemented to surlace. The top of the 15.8 Ib/gal tail cement slurry is planned to be at
-3,292' MD.
B. The 7" casing will be cemented with 15.8 Ib/gal tail cement slurry to 500' MD above the Ma Sands -5,668' MD
C. The Kick Tolerance for the surlace casing is 53.3 bbls with 9.2 ppg mud, 11.6 ppg FIT, and an 8.7ppg pore
pressure.
D. The Kick Tolerance for the intermediate casing is infinite with 9.2 ppg mud.
E. Integrity Testing
V.
Test Point
9-%-in shoe
7-in shoe
Test Depth
20-ft minimum from 9-%--in shoe
20-ft minimum from the 7-in shoe
Test type
FIT
FIT
EMW (Ib/~al)
11.6 minimum
12.0 minimum
Stuck Pipe
A. We do not expect stuck pipe.
B. There could be slight differential sticking issues with the liners. Centralizers will be run to mitigate.
VI. Hydrogen Sulfide
A. W Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions
should be followed at all times. Water injection on W-Pad was initiated in late 2001, and H2S levels
are expected to remain low until the waterflood matures. Recent H2S data from the pad is as follows:
B. Adjacent producers at Surface:
a. W -12: less than 8 ppm
C. Adjacent producers at TD:
a. W -200: 0 ppm
D. The maximum recorded level of H2S on the pad was under 20 ppm.
VII. Faults
A. The planned directional trajectory crosses two faults. These faults have been previously crossed at
similar TVD's by W-01 with no problems associated with them.
B. Fault #1: 5,691' MD 4,272' TVD 4,185' TVDss
C. Fault #2: 6,613' MD 4,832' TVD 4,745' TVDss
CONSULT THE W PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION
Version 1.0
W-203 ML Hazards and Contingencies
Page I of 1
POST-COMPLETION
W-203, W-203 L 1 & W-203(" '2
n
TREE: FMC 4-1/16" 5M ~ \ Orig KB elev (0-14) = 34.0' I
WELLHEAD: FMC Gen 5 System (
11", 5M csg.head wI 7" mandrel hanger \X packoff
11" x 11". 5M. tbg spool w/
11" x 4-1/2" tubing hanger
11" X 4-1/16" Adaptor Flange
[~" 92 Ib/tt, H-40 Welded I 114' I
. ~ 9-518" TAM Port Collar I 1,000' I
Halliburton X-Nipple (3.813" 10) \2,200' TVD I
G - - Cameo gas lift mandrel 4-112" x 1" KBG2 I 3,000', 4,500' , 4,700' TVD I
f With RP Shear Valve in top mandrel
/ 4-1/2", 12.6 Ibltt, L-80, BTC-M
Coupling 00: 5.2"
OrifUlO: 3.833"/3.958"
[!../ ,/ ... 9-518", 40 ppg L-80 BTC-M Csg @ 3,996' MD
~ ~Æ . . \ _6 700' \
4.5" HES XO Ourasleeve with 3.813" 10 '
\ -6,900' \
\ -7,000' \
7" X 4.5" Baker PRM Packer
~
...
Halliburton X-Nipple (3.813" ID)
9.2 PPG BaradrilN mud below Completion
RA Tag
. -'>..~ '~;~:::~~:~:l~~~~~~~~-=.'.Jj~r~ì
6-1/8" OBa Lateral 17,093'-11,313'1
Baker Hughes Hookwall Hanger @ 7,083' MO
(3.958"10 out into lateral- 4.125" 10 down)
Window in 7" casing@ 7,093' MO
Well Inclination @ Window = 67°
Baker Packer
\-7,176' \
7",26#, L-80, BTC-M
Casing Oritt: 6.151"
Casing 10: 6.276"
RA Tag
.""-..
.. i'~~~~:~-'':~,'','",,',,~,,'','",',':':-,-,,-"---.' --'-,~-' ,-- _-_~/J. ----u. :~"":"-"",,:',~,',-,',,,',,-':'-',',:'
. ::::::1 = = = ~ = =1)':';":
I" . ...~_.:-.':-~::".--.~. r- ~=-~ n._",.__..)
""'"6.:1/8" OBc Lateral 17,343'-11,324'1
Baker Hughes Hookwall Hanger @ 7,333' MO
(3.958" 10 out into lateral- 4.125" 10 down)
Window in 7" casing@ 7,343' MO
Well Inclination @ Window = 74°
7" Casing Shoe @ 7,750' MOt5, 195' TVD -
ff
~ r~"''',', ","'-,""'."', -,'-",'" ~ "., "'-',-, "',:,,',
~~ ,.~..""':""':"-"""':"" ,"':':,""",!.
~ .::::: -' -= -- --(þd" :'t
~ - - - -I8J
~ ~---:-:' 7:~ , "-:,'",',' ".,
---.J~'i_.;;;,:,~';;;'"~d, ''':...._-...';J
-~ /J
6-1/8" OBd Lateral 17,750'-11,330'1
Baker ZXP Liner Top Packer & Hanger@ 7,650' MO
DATE
REV. BY
COMMENTS
POLARIS
WELL: W-203 ML
API NO:
4/1612002
MIK TRIOLO
Level 3 Multi-Lateral, 3112" GL Completion
GPB DRilliNG AND WELLS
PBU WOA W Pad D llQ t
w-2õ3 Leg 2 WP03 ri ues ~
Scale: 1 inch = 800ft Eastings (Well)
4400 5200 6000 6800
I I
... ~Leg 2 Exit @ 12.000°/1000, High Side TF: 7093,02ftMD,5047.12ftTVD
Begin 6-1/S" Hole Size
Begin Dlr e 10.000°/1000: 7113.02ft MD, 5054.06ft TVD
End Dlr, Start Sail @ 91.959° : 7354.72ftMD,5090.00ftTVD
Begin Dlr 0 4.oo00/100ft: 7841.100 MD. 5073,371t TVD
End Dlr, Start Sail @ 90.0SSo : 7923,6SftMD,S071,9OftTVD
7600
I
spel'""f"""y-sull North Slope Alaska
Q:f!L~\"_!J;¡-g_~_~_R vt~(!-~ B PXA
A H.mb"rtOi'} Cornp:lftY
Well:
Horizontal Coordinates:
Ref, Global Coordinates:
Ref. Structure Reference:
Ref. Geographical Coordinates:
RKB Elevation:
Current Well Properties
W-203 WP061 Leg 2 WP03
5958645.07 N, 612049.02 E
1418.92 N, 2155.01 E
700 17' 45.4663" N. 1490 OS' 33.6465" W
86.90ft above Mean Sea Level
86.90ft above Structure Reference
,-.---.-------.- W-203 OBa Leg 2 T1
1. 5071.90ft TVD
. 1209.89 S, .1942.49 E
- -1200
....--...-....---.-.---.. W-?'03 OOa GeoPoly
North Reference:
Units:
True North
Feet (US)
Proposal Data for W-203 OBa Leg 2 WP03
Well
Well
ft
True North
---------------W-203 Driller's Poly @ 95%
-.
- -2000
Vertical Origin:
Horizontal Origin:
Measurement Units:
North Reference:
::::-
ã5
~
C/)
0)
c:
- -2800 €
0
z
Dogleg severity: Degrees per 100 feet (US)
Vertical Section Azimuth: 119.4000
Vertical Section Description:Well
Vertical Section Origin: 0.00 N,O.OO E
Measured Incl. Azlm. Vertical Northlngs Eastings Vertical Dogleg
Depth Depth Section Rate
7093.02 68.504 128.478 5047.12 591.06 S 4399.39 E 4122.96
7113.02 70.904 128.478 5054.06 602.73 S 4414.08 E 4141.48 12.000
7354.72 91. 959 140.554 5090.00 769.53 S 4582.72 E 4370.30 10.000
7841.10 91. 959 140.554 5073.37 1144.91 S 4891.57 E 4823.64 0.000
7923.68 90.085 143.274 5071.90 1209.89 S 4942.49 E 4899.91 4.000
J 1312.95 90.085 143.274 5066.90 3926.40 S 6969.22 E 7999.17 0.000
'\
5087 >
W-203 OBs Leg 2 T2 ' 4 1/2" Liner
S06&.90tt TVD ---.--.---:.....--; 11312,95ft MD
3926AO $, 6969.22 E V 5066.90ft TVD
- -3600
~Q
~4,,~
,?r::,~ . _.0 Q Q
~~Q' ro~'\"'- ~~ ~Q cf:¡~~
~~~ r;þþ'';i tJq:,. '!I,>1~ fj)"4".
-<.t ..1 ~Q,t:> ~~Q~ ~,f;,r::,1 ~~Q,
-:.66 r::,'.~ ~t..1'1= ~~ -",ro~
:(\ c:¡ 4,,~' 1'!1T' \ \\J" 1C;¡'I'~'
y.\~ .1'\ ~o" 1~ . ~"
r::,~' r::,~' \'?J~ ~" r,)~'1J
!:f\'\ .::.\1.6 !:f\'\ @ ~ o\4"r::,fj @ ~
~ 4,,'.~fj ~ y.o\6 4"r::,'iF ç¡\ ¡,.';)tfJ t;;,$\'\
::::-g ~.pl.. @ ro-4,,'ÍÒ Q\~ @ 1\~ .::.I..g.?- Q\~ @ 1\~ .::.,g.?-
(i) II ....6~'. e~~ è~ ~~òQ 'è~ ~~òQ'
$ .c ~,/~\'- /"'/ Total Depth: 11312.9SftMD,5066.9OftTVD
;-.~ - ~ ¡=rm~-- - -j1- - - .,..- - - -,-œ- - ----¡"111""~ J"V"- ~ u u. / - - - - -080, S04~90n TVD
_0.."-- ';:'.. W.203 08a LaJl2 WPO~
W 5200 - ---- /." . . " w.!,)3 ()ßçJ..c~ I WI'ò3"" . ---",'-., W-203 OBa Leg 2 T2
(]) - W.20:ì OBI! Leg.2 T1 // W.20.1 Ma;nOrrl WP06 41/2" Liner -----50G6.9Oft TVD
0 B 5071.!JOfl1VO ,/ 11312.95ft MD 3926.40 S. 6969.22 E
~ Cf) ì2Û9.$9 S. 4942.49 E I I I I 5066., TVD
.~ 4000 4800 5600 6400 7200 8000
> Scale: 1 inch = 800ft Section Azimuth: 119.400° (True North)
Vertical Section (Well)
~
0
0
co
'-'.
Total Depth: 11312.95ftMD,S066.9OftTVD
~.
l.-
e
- -4400 .-
W
-æ
u
C/)
,........,.."". - - ~I. ,... ^^ ^" ,...,.,,..
North Slo
..BPXA
.:dtpBU.i¡WOA 'w Pad Slot W-203
,---"'.'., ,
"'.~W-203:W"S - W-203 OBa Leg 2 WP03
. Revised: 23 April, 2002
~-"
PROPOSAL REPORT
23 April, 2002
-,
Surface Coordinates: 5958645.07 N, 612049.02 E (70017' 45.4663" N, 149005' 33.6465" W)
Surface Coordinates relative to Project H Reference: 958645.07 N, 112049.02 E (Grid)
Surface Coordinates relative to Structure Reference: 1418.92 N, 2155.01 E (True)
Kelly Bushing: 86.90ft above Mean Sea Level
spe""'""y-sul}
DRIL~ING SERVICES
A Halliburton Company
Proposal Ref: pro11179
North Slope Alaska
Measured
Depth
(ft)
Incl.
Azim.
7093.02 68.504 128.478
7100.00 69.341 128.478
7113.02 70.904 128.478
7200.00 78.432 132.999
7300.00 87,167 137.911
7354.72 91 .959 140.554
7400.00 91.959 140.554
7500.00 91.959 140.554
7600.00 91 .959 140.554
7700.00 91 .959 140.554
7800.00 91 .959 140.554
7841,10 91.959 140.554
7900.00 90.622 142.494
7923.68 90.085 143.274
8000.00 90.085 143.274
8100.00 90.085 143.274
8200.00 90.085 143.274
8300.00 90.085 143.274
8400.00 90.085 143.274
8500.00 90.085 143.274
8600.00 90.085 143.274
8700.00 90.085 143.274
8800.00 90.085 143.274
8900.00 90.085 143.274
9000.00 90.085 143.274
23 April, 2002 - 10:14
Sub-Sea
Depth
(ft)
4960.22
4962.73
4967.16
4990.15
5002.68
5003.10
4984.89
4984.74
4984.59
4984.44
4984.30
4984.15
4984.00
4983.85
4983,71
4983.56
4983.41
Sperry-Sun Drilling Services
Proposal Report for W-203 WPS. W-203 DBa Leg 2 WP03
Revised: 23 Apri~ 2002
Vertical
Depth
(ft)
5047.12
5049.63
5054.06
5077.05
5089.58
5090.00
5088.45 .
. 5085.03
5081.61
5078.20
1;;;;1:).
'74.78
'73.37
5072.05
5071.90
5071.79
5071.64
5071 .49
5071 ,34
5071 .20
5071 .05
5070.90
5070.75
5070.61
5070.46
5070.31
Local Coordinates
Northings Eastings
(ft) (ft)
591.06 S
595.11 S
602.73 S
4399.39 E
qt~
Global Coordinates ;.'.~
Northings Eastings
(ft) eft)
4404.49 E . 5958115.69N
4414.08 E 5958108.21 N
.' 5958054.43 N
'5957984.83 N
804.48 S
. . 881.66 S
958.83 S
1036.01 S
1113.19 S
1144.91 8
1191.00 8
1209.89 8
1271.068
1351.218
1431.368
1511.51 8
1591.66 S
1671.818
1751.968
1832.11 8
1912.26 S
1992.41 8
2072.56 8
582.72 E
4611.47 E
4674.97 E
4738.47 E
4801 .97 E
4865.47 E
4891.57 E
4928.20 E
4942.49 E
4988.13 E
5047.93E
5107.73 E
5167.52 E
5227.32 E
5287.12 E
5346.92 E
5406.72 E
5466.52 E
5526.31 E
5586.11 E
Page2of7
5957943.94 N
5957909.43 N
5957833.21 N
5957756.98 N
5957680.76 N
5957604.54 N
5957573.21 N
5957527.67 N
5957509.00 N
5957448.52 N
5957369.27 N
5957290.02 N
5957210,77 N
5957131.52 N
5957052.27 N
5956973.02 N
5956893.77 N
5956814.52 N
5956735.27 N
5956656.02 N
616461.89 E
616471.59 E
616535.85 E
616606.38 E
616642.70 E
616671 .98 E
616736.62 E
616801.26 E
616865.90 E
616930.54 E
616957.11 E
616994.43 E
617009.00 E
617055.54 E
617116.53 E
617177.52 E
617238.50 E
617299.49 E
617360.48 E
617421.46 E
617482.45 E
617543.44 E
617604.42 E
617665.41 E
.
BPXA
PBU_WOA W Pad
Dogleg
Rate
(0/100ft)
Vertical
Section
Comment
4122.96 Leg 2 Exit @ 12,OOoo/100ft, High Side
TF: 7093.02ftMD,5047.12ftTVD
7" Casing
12.000 4129.39
12.000 4141.48 Begin Dlr @ 1 0.0000/100ft : 71 ~2t
MD, 5054.06ft TVD '
10.000 4223.64
10.000 4318.85
10.000 4370.30 End Dir, Start 8ail @ 91.959° :
7354. 72ftM D ,5090.00ftTVD
0,000 4412.50
0.000 4505.71
0.000 4598.92
0.000 4692.12
0.000 4785,33
0.000 4823.64 Begin Dir @ 4,OOoo/100ft : 7841,1 Oft
MD, 5073,37ft TVD
4.000 4878.18
4.000 4899.91 End Dir, 8tart 8ail @ 90,085° :
7923.68ftM D,5071.90ftTVD
Target - W-203 OBa T1, Current TargE
0.000 4969.69
0.000 5061.14
0.000 5152.58
0.000 5244.02
0.000 5335.47
0.000 5426.91
-~.
0.000 5518.35
0.000 5609.80
0.000 5701.24
0.000 5792.68
0.000 5884.13
DrillQuest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for W-203 WPS - W-203 OBa Leg 2 WP03
Revised: 23 April, 2002
BPXA
North Slope Alaska PBU_WOA W Pad
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastin~s Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft )l;¡t\';L (o/100ft)
9100,00 90.085 143.274 4983.26 5070.16 2152.71 S 5645.91 E 5956576:7:7 'N - 617726.40'E 0.000 5975.57
9200.00 90.085 143.274 4983.12 5070.02 2232.86 S 5705.71 E 5956497.52 N 617787.38 E 0,000 6067.01
9300,00 90.085 143.274 4982.97 5069.87 2313.01 S 5765.51 E 5956418.27 N 617848.37 E 0.000 6158.46
9400.00 90.085 143.274 4982.82 5069.72 2393.16 S 5825.31 E. 5956339.02 N 617909.36 E 0.000 6249.90
9500.00 90.085 143.274 4982.67 5069.57 2473.32 S 5885.11 E 5956259.77 N 617970.34 E 0.000 6341 .34 -.
9600.00 90.085 143.274 4982.53 5069.43 2553.47 5944.90E 5956180.51 N 618031.33 E 0.000 6432.79
9700.00 90.085 143.274 4982.38 5069.28 263;3,ߥ 6004.70 E 5956101.26 N 618092.32 E 0.000 6524,23
9800.00 90.085 143.274 4982.23 5069.13 .?iløi¡PA77 S 6064.50 E 5956022.01 N 618153.30 E 0,000 6615.68
9900,00 90.085 143.274 4982.08 5068.98 2793.92 S . 124.30 E 5955942.76 N 618214.29 E 0,000 6707.12
10000.00 90.085 143.274 4981.94 5068.84 2874.07 S 184.10 E 5955863.51 N 618275.28 E 0.000 6798.56
10100.00 90.085 143.274 4981.79 -5068.69 2954,22 S 6243.90 E 5955784.26 N 618336.26 E 0.000 6890.01
10200.00 90.085 143.274 4981.64 5068.54 3034.37 S 6303.69 E 5955705.01 N 618397.25 E 0.000 6981.45
10300.00 90.085 143.274 4~8il.;49 ." 50e8~39 3114.52 S 6363.49 E 5955625.76 N 618458.24 E 0.000 7072,89
10400.00 90.085 143.274 'i!I¡'I,f~:li¡35 5068,25 3194.67 S 6423.29 E 5955546.51 N 618519.22 E 0.000 7164.34
10500.00 90.085 143.274 1.20 - ;;5ig68.10 3274.82 S 6483.09 E 5955467.26 N 618580.21 E 0.000 7255.78
10600.00 90.085 143.274 498,1.05,: ' 5067.95 3354.97 S 6542.89 E 5955388.01 N 618641.20 E 0.000 7347.22
10700.00 90.085 143.274 49arJ!90 5067.80 3435.12 S 6602.69 E 5955308.76 N 618702.18 E 0.000 7438.67
10800.00 90.085 143.274 4980,76 5067.66 3515.27 S 6662.48 E 5955229,51 N 618763.17 E 0.000 7530.11
10900,00 90.085 143.274 4980.61 5067,51 3595.42 S 6722.28 E 5955150.26 N 618824.16 E 0.000 7621.55
11000.00 90.085 143.274 4980.46 5067.36 3675.57 S 6782.08 E 5955071.01 N 618885.14 E 0.000 7713.00
11100.00 90.085 143.274 4980.31 5067.21 3755.73 S 6841.88 E 5954991.76 N 618946.13 E 0.000 7804.44
11200.00 90.085 143.274 4980.17 5067.07 3835.88 S 6901.68 E 5954912.51 N 619007.12 E 0.000 7895.88
11300.00 90.085 143,274 4980.02 5066.92 3916.03 S 6961.48 E 5954833.26 N 619068.10 E 0.000 7987.33
11312.95 90.085 143.274 4980.00 5066.90 3926.40 S 6969.22 E 5954823.00 N 619076.00 E 0.000 7999.17 Total Depth:
11312,95ftMD,5066.90ftTVD
4 1/2" Liner
Target - W-203 aBa T2, Current Targl
23 April, 2002 - 10:14
Page 3 of7
DrillQuest 2.00.09.006
DATE
03/14/02
CHECK NO.
00206304
H 206304
VENDOR
DISCOUNT
Ai ASKAOIl A
NET
00
DATE
INVOICE I CREDIT MEMO
DESCRIPTION
GROSS
100. 00
031202 CK031202N
PYMT COMMENTS:
HANDL:NG INST:
100. 00
H
Pernit To Drill Fee
S/H ~ Terrie Hub~le
X4628
RECEIVEC
/lbf ê5V¡~.
Z(./.Akvd
ßlvrlt
C/;~ tl-:j
W/A06L~
!\PR 30 2002
Alaska Oil & GäS COfìfì. i~Ollílíi t<;:i'llI:
Anchora~w
L
THE ATTACHED CHECK IS IN PAYMENT FOR ITEI
100 nn
1no 00
+v ~f
No. H 206304
BP EXPLORATION, (All
P.O. BOX 196612
ANCHORAGE, ALASKA 99519
FIRST NATIONAL BANK OF ASHLAND
AN AFFlUATE OF
NATIONAL CITY BANK
CLEVElAND, OHIO
CONSOLIDATED COMMERCIAL ACCOUNT
56.389
"""'4T2
00206304
PAY
ONE HUNDRED & 00/100************************************* US DOLLAR
DATE
03/14/02
AMOUNT
$iOO.Oü
NOT VALID AFTER 120 DAYS
To The
ORDER
Of
ALASKA OIL AND GAS
CONSERVATION COMMISSION
333 WEST 7TH AVENUE
SUITE 100
ANCHORAGE
\( t ,
) ,J"\ 1'"';; f"
E '~~?';.' : "
.,;..."._.V (J '. ." '" '--.....
AK 99501
III 2 0 b ~ 0 ~ III I: 0 ~ ~ 2 0 ~ B Ii 5 I: 00 a L, L, ~ g III
CHECK 1
ST ANDARD LEITER
DEVELOPMENT
/
DEVELOPMENT
RED RILL
EXPLORA TJON
INJECTION WELL
INJECTION WELL
REDRILL
("
(
TRANSWT AL LEITER CHECK LIST
CIRCLE APPROPRIATE LEITERlPARAGRAPHS TO
BEINCLUDEDINTRANSNUTTALLETTER
WELL NAME P߿P - tJ~ ZD3 L""2-
CHECK WHAT APPLIES
ADD-ONS (OPTIONS)
MULTI LATERAL
(If api number last two (2)
digits are between 60o.(J9)
¡ &1
Pll.-OT HOLE (PH) .
ANNUL~POSAL
NO
ANNULAR DISPOSAL
<-> YES
ANNULAR DISPOSAL
THIS WELL'
"CLUE"
The permit is for a new wel1bore segment of existing weD
Permit No, . API No. .' .
~ction should conti§5to be rel)"fled as a function .of
re;;;ginaJ API number state bove.
f߿f /;0.-U>3 /
Q-D?-~O'77
SD -02.C}- 2-3Dtg7"-OQ
In accordance with 2.0 AAC 2S.005(f), all records, data and
logs acquired for the pilot hole must be clearly
. differentiated in both name (name on permit plus PH)
and API number (50 -70/80) from
. records, data and logs acquired for wen (na.me on permit).
Annular disposal has not been requested. . .
Annular Disposal of drilling wastes will not be approved.. .
Annular Disposal of drilJing wastes will not be approved. . .
DISPOSAL INTO OTHER Please note that an disposal of fluids generated. ~ .
ANNULUS
<--J YES +
SPACING EXCEPTION
Templates are located m drive\jody\templates
Enclosed is the approved application for permit to drill the
above referenced well. The permit is approved ,sùbJect to
full compliance with 20 AAC 25.055. Approval to peñorate
and produce is contingent upon issuan'ce of a conservation
order approving a spacing exception.
(Company Name) will assume the liability of any protest to
the spacing exception that may occur.
WELL PERMIT CHECK~ISJ COJilPANY ß.f')é WELI..NAME tfJt¿ Woo Zó3 ¿ <- PROGRAM: Exp ~ D!;.V!Redrll- Serv - Wellbore seg ~nn. disposal para req
FIELD & POOL h'f()/bU tNITCLASS p,Ev 1()/L GEOLAREA ffi() UNIT# ó//&:,š?) ON/OFFSHORE()Þ\
ADMINISTRATION 1. Permit fee attached#. . . . '\k: . . . . . . . . . . . , . , WN ~. ¡¿ .2.0 /frle- ~ CðÇ~) ø/CY) ,("~¿ . ~ -I reqc ~/;ec/ ~
2. Lease number appropriate. '~"'If'-. . . . . . . . . . . . . . . ~ N J1tvll""(4.'¡--Æ/ . ReI~ c~ ...6 1St: 0
~: ~~~~~~~~~~~ed:~~;~:~~~* .' .. .. .. .. .. .. .. .' .. .' .. >y-r~.~~ IocA~~ ~~~ ¿j )~ ;;n-ocluL4~ ~~~ ~)
5. Well located proper distance from driUing unit boundary. . . . . ~ D 2-f¿ z¿;.3 ; ~dvc.. ~w '44Av4 /?~ ~r-u &...
6. Well located proper distance from other wells.. . . . . . . . . N "ârY "-1J.--ý ti;( /I:ÞL- 'ó '17£/5;;1,; ~~. r. b. ';'e.-
7. Sufficient acreage available in drilling unit.. , . . . . . . . . . N Ill:> '- c"bz.p¿ Z-bt./. ,,¿þ .
8, If deviated, is well bore plat included. . , . . . . . . . . . . . . N ""*~ --p~ 4 L-I ~ ~ðl. ~ /"'.~~ ~,./f~ J fl. A'ñ
9. Operator only affected party.. . , . . . . . . . . . . . . . . . N (41. t-ó, --'~~. çr""
10. Operator has appropriate bond in force. . . . . . . . . . . . . N
11. Permit can be issued without conservation order. . . . . . . .
AP~ DATE 12. Permit ca~ be issued without administrativ~ approval.. . . . .
~() ç /, D ~ 3. Can permit be approved before 15-day walt.. . . . . . , . . . Y
éÑGINEERING 14. Conductor string provided. . . . . . . . . . . . . . . . . . . ¥-tt
15. Surface casing protects all known USDWs. . . . . . . . . . . -'f-N-¡J!k-
16. CMT vol adequate to circulate on conductor & surf csg. . . . . -¥--N-
17. CMT vol adequate to tie-in long string to surf csg. . . . . . . . -¥--N-. .
18. CMT will cover all known productive horizons. , . . . . . . . . ~.*='* sf 0 -¡((¿ d
19. Casing designs adequate for C! T, B & permafrost. . . . . . . N ¡\ f /
20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . N l1~lc,'Y'- I 'T.
21. If a re-drill, has a 10-403 for abandonment been approved. . . 'in N- Nt1. f\-
22. Adequate wellbore separation proposed.. . , . . . . . . . . . ~ N
23. If diverter required, does it meet regulations. . . . . . . . . . -¥--N-I\LI,t-
24. Drilling fluid program schematic & equip list adequate. . . . . rfl N
25. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . tP. N
APPJ\. DÄ1~T~ 26. BOPE press rating appropriate; test to ~ 500 psig. ~ N f\1[ Ç. P ~ I fð 'í c.¡ p-~.
~/"r t:; ?.fO L 27. Choke manifold complies w/API RP-53 (May 84). . . . . . . . N
28. Work will occur without operation shutdown. . . . . . . . . . . N
29. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . Y @
GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures. . . . . (]) N . ---- / r7 J /J
31. Data presented on potential overpressure zones . . . . . . . ~ /V--~~. ~c-~....
32. Seismic anal~~is of shallo~ gas zones. . . . . . . . . . . . . .,J 'f.. Y N
A~~ DA1E V 33. Seabed condition survey (If off-shore) . . . . . . ~ . . ./ Y N
pV $"", (.1) 34. Contact name/phone for weekly progress reports ~ratory only] Y N
ANNULAR DISPOSAL 35. With proper cementing records, this plan
(A) will contain waste in a suitable receiving zone; . . . . . . .
(B) will not contaminate freshwater; or cause drilling waste. ..
to surface;
(C) will not impair mechanical integrity of the well used for disposal; Y N
(0) will not damage producing formation or impair recovery from a Y N
pool; and
(E) will not circumvent 20 MC 25.252 or 20 MC 25.412. Y N
GEOLOGY: ENGINEERING: UIC/Annular: COMMISSION:
(
(
APPR DATE
Y N
Y N
Comments/Instructions:
RPC-
SFD~
TEM
WGA \¡i4~
COT j'
DTS D:SjO( cz
JMH
)
)
Well H ¡story File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special'effort has been made to chronologically
organize this category of information.
)
Sperry-Sun Drilling Services
LIS Scan utility
$Revision: 3 $
LisLib $Revision: 4 $
Wed Aug 14 17:23:37 2002
Reel Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .02/08/14
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... . UNKNOWN
Continuation Number.... ..01
Previous Reel Name.... ...UNKNOWN
Comments................ .STS LIS
Tape Header
Service name........... ..LISTPE
Date. . . . . . . . . . . . . . . . . . . . .02/08/14
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Previous Tape Name..... ..UNKNOWN
Comments.............. ...STS LIS
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay Unit
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
#
REMARKS:
Writing Library.
)
Scientific Technical Services
Writing Library. Scientific Technical Services
MWD RUN 1
AK-MW-22078
C.A. DEMOSKI
S. KOLSTAD
MWD RUN 9
AK-MW-22078
T. MCGUIRE
L. VAUGHN
MSL 0)
W-203 L2
500292308761
BP Exploration
Sperry Sun
14-AUG-02
MWD RUN 2
AK-MW-22078
C.A. DEMOSKI
A. MADSEN
21
11N
12E
3668
1197
.00
87.14
52.90
(Alaska), Inc.
MWD RUN 3
AK-MW-22078
C.A. DEMOSKI
A. MADSEN
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
12.250 9.625 4065.0
8.750 7.000 7135.0
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
aoa~09j
¡ 0 C;¡'{7
)
)
STATED.
2. MWD RUNS 1 & 2 ARE DIRECTIONAL WITH DUAL GAMMA RAY
(DGR) UTILIZING
GEIGER MUELLER TUBE DETECTORS.
3. MWD RUN 3 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR)
UTILIZING GEIGER
MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE
RESISTIVITY PHASE 4
(EWR4), COMPENSATED NEUTRON POROSITY (CNP), AND
STABILIZED LITHO-DENSITY (SLD).
4. MWD RUN 8 IS DIRECTIONAL ONLY FOR SETTING WHIPSTOCK
AND MILLING
WINDOW AND IS NOT PRESENTED.
5. MWD RUN 9 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR)
UTILIZING GEIGER
MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE
RESISTIVITY PHASE 4
(EWR4), COMPENSATED THERMAL NEUTRON POROSITY (CTN),
AND
STABILIZED LITHO-DENSITY (SLD).
6. GAMMA RAY (SGRC) IS LOGGED BEHIND CASING FROM 4020'
MD, 3175' TVD TO
4065' MD, 3204' TVD.
7. FOR LOG DATA ABOVE THE KICKOFF POINT REFERENCE THE
LOG FOR W-203.
8. DEPTH SHIFTING / CORRECTION WAIVED PER THE EMAIL
FROM
D. SCHNORR OF 06/04/02. MWD CONSIDERED PDC.
W-203L2 IS TIED INTO W-203 AT THE KICK OFF POINT.
THIS WELL KICKS OFF FROM W-203 AT 7135' MD, 5037'
TVD (TOP OF WHIPSTOCK)
ALL MWD LOG HEADER DATA RETAINS THE ORIGINAL
DRILLER'S DEPTH REFERENCES.
9. MWD RUNS 1 - 3 & 9 REPRESENT WELL W-203L2 WITH
API # 50-029-23087-61. THIS WELL REACHED A TOTAL
DEPTH OF
11340' MD, 5086' TVD.
SROP = SMOOTHED RATE OF PENETRATION
SGRC = SMOOTHED GAMMA RAY COMBINED
SEXP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
EXTRA SHALLOW SPACING)
SESP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
SHALLOW SPACING)
SEMP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
MEDIUM SPACING)
SEDP = SMOOTHED PHASE SHIFT DERIVED RESISTIVITY (
DEEP SPACING)
SFXE = SMOOTHED FORMATION EXPOSURE TIME
SBD2 = SMOOTHED BULK DENSITY (LOW-COUNT BIN)
SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT
BIN)
SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR
(LOW-COUNT BIN)
TNPS = SMOOTHED THERMAL NEUTRON POROSITY
(SANDSTONE MATRIX,
FIXED HOLE SIZE)
SPSF = SMOOTHED COMPENSATED NEUTRON POROSITY
(SANDSTONE MATRIX, FIXED HOLE SIZE)
SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT
CTFA =
RATE
CTNA =
RATE
SNFA =
RATE
SNNA =
RATE
SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT
SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT
SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT
")
ENVIRONMENTAL PARAMETERS USED IN PROCESSING THE
NEUTRON LOG DATA:
HOLE SIZE:
8.75 / 6.125"
MUD WEIGHT:
9.25 PPG
MUD FILTRATE SALINITY:
CHLORIDES
FORMATION WATER SALINITY:
FLUID DENSITY:
G/CC
MATRIX DENSITY:
$
LITHOLOGY:
SANDSTONE
9.0 -
400 - 19000 PPM
20000 PPM CHLORIDES
1. 00
2.65 G/CC
File Header
Service name...... ...... .STSLIB.OOl
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation.... ...02/08/14
Maximum Physical Record. .65535
File Type.............. ..LO
Previous File Name.... ...STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
GR
ROP
RPX
RPS
RPM
RPD
FET
NPHI
FCNT
NCNT
DRHO
RHOB
PEF
$
1
clipped curves; all bit runs merged.
.5000
START DEPTH
57.0
114.5
4055.0
4055.0
4055.0
4055.0
4055.0
4055.0
4055.0
4055.0
4065.5
4065.5
4065.5
STOP DEPTH
11281.5
11337.5
11288.5
11288.5
11288.5
11288.5
11288.5
11247.0
11247.0
11247.0
11261. 0
11261.0
11261.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED
PBU
MWD
MWD
MWD
MWD
$
DATA SOURCE
TOOL CODE
#
REMARKS:
BIT RUN NO
1
2
3
9
MERGED MAIN PASS.
$
MERGE TOP
57.0
1302.5
4078.5
7135.5
MERGE BASE
1302.0
4078.0
7135.0
11337.5
#
Data Format Specification Record
Data Record Type............. .....0
Data Specification Block Type.....O
Logging Direction.......... ...... .Down
Optical log depth units.......... .Feet
Data Reference Point............. .Undefined
Frame Spacing................. ... .60 .1IN
,)
Max frames per record........ .... .Undefined
Absent value.......... .......... ..-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service
DEPT
ROP MWD
GR MWD
RPX MWD
RPS MWD
RPM MWD
RPD MWD
FET MWD
NPHI MWD
FCNT MWD
NCNT MWD
RHOB MWD
DRHO MWD
PEF MWD
Order
Units
FT
FT/H
API
OHMM
OHMM
OHMM
OHMM
HR
PU-S
CP30
CP30
G/CM
G/CM
B/E
Size Nsam
4 1
4 1
4 1
4 1
4 1
4 1
4 1
4 1
4 1
4 1
4 1
4 1
4 1
4 1
Rep Code
68
68
68
68
68
68
68
68
68
68
68
68
68
68
Offset
0
4
8
12
16
20
24
28
32
36
40
44
48
52
Channel
1
2
3
4
5
6
7
8
9
10
11
12
13
14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 57 11337.5 5697.25 22562 57 11337.5
ROP MWD FT/H 0.27 2158.65 269.921 22447 114.5 11337.5
GR MWD API 11.41 128.27 58.3318 22450 57 11281.5
RPX MWD OHMM 0.21 65.81 12.764 14468 4055 11288.5
RPS MWD OHMM 1. 23 63.85 13.4815 14468 4055 11288.5
RPM MWD OHMM 1. 85 2000 14.3305 14468 4055 11288.5
RPD MWD OHMM 0.51 2000 14.3442 14468 4055 11288.5
FET MWD HR 0.09 51.32 0.663887 14468 4055 11288.5
NPHI MWD PU-S 9.68 71. 01 36.4823 14385 4055 11247
FCNT MWD CP30 152.62 1283 413.372 14385 4055 11247
NCNT MWD CP30 2008 29289.9 14207.6 14385 4055 11247
RHOB MWD G/CM 1. 37 3.89 2.20725 14392 4065.5 11261
DRHO MWD G/CM -0.28 1. 49 0.0753398 14392 4065.5 11261
PEF MWD B/E 0.37 11.81 1.72168 14392 4065.5 11261
First Reading For Entire File... ...... .57
Last Reading For Entire File... ....... .11337.5
File Trailer
Service name... ........ ..STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/08/14
Maximum Physical Record. .65535
File Type.............. ..LO
Next File Name. ........ ..STSLIB.002
Physical EOF
File Header
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/08/14
Maximum Physical Record. .65535
File Type................ LO
Previous File Name...... .STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
2
header data for each bit run in separate files.
1
.5000
)
VENDOR TOOL CODE START DEPTH
GR 57.0
ROP 114.5
$
STOP DEPTH
1244.0
1302.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
25-MAY-02
Insite 4.05.5
66.37
Memory
1302.0
.0
17.4
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
TOOL NUMBER
PBOO188HWRGV6
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
12.250
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
Spud Mud
8.70
320.0
9.5
200
11. 4
.000
.000
.000
.000
.0
72.0
.0
.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.... ..............0
Data Specification Block Type.....O
Logging Direction......... ...... ..Down
Optical log depth units. ......... .Feet
Data Reference Point........ ..... .Undefined
Frame Spacing... .......... ...... ..60 .1IN
Max frames per record.... ..... ... .Undefined
Absent value...................... -999
Depth Units.. . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD010 FT/H 4 1 68 4 2
GR MWD010 API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 57 1302 679.5 2491 57 1302
ROP MWD010 FT/H 0.27 230.53 85.8046 2376 114.5 1302
GR MWD010 API 18.15 100.88 42.8461 2375 57 1244
"
First Reading For Entire File......... .57
Last Reading For Entire File.......... .1302
File Trailer
Service name............ .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/08/14
Maximum Physical Record. .65535
File Type.... .......,.. ..LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/08/14
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
3
)
header data for each bit run in separate files.
2
.5000
START DEPTH
1244.5
1302.5
STOP DEPTH
4020.5
4078.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
27-MAY-02
Insite 4.05.5
66.37
Memory
4078.0
19.0
55.4
TOOL NUMBER
PBOO188HWRGV6
12.250
4065.0
Spud Mud
9.30
260.0
9.4
200
8.8
.000
.000
.000
.0
84.2
.0
,)
MUD CAKE AT MT:
.000
.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units.... ...... .Feet
Data Reference Point. ..... ....... .Undefined
Frame Spacing............. ....... .60 .1IN
Max frames per record..... ....... .Undefined
Absent value.............. ...... ..-999
Depth Uni t s . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type. ..0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 1244.5 4078 2661. 25 5668 1244.5 4078
ROP MWD020 FT/H 2.47 843.9 211. 52 5552 1302.5 4078
GR MWD020 API 21.9 106.37 66.0473 5553 1244.5 4020.5
First Reading For Entire File. ....... ..1244.5
Last Reading For Entire File.. ....... ..4078
File Trailer
Service name............ .STSLIB.003
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/08/14
Maximum Physical Record. .65535
File Type............ ... .LO
Next File Name.......... .STSLIB.004
Physical EOF
File Header
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .02/08/14
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
4
header data for each bit run in separate files.
3
.5000
START DEPTH
4021. 0
STOP DEPTH
7135.0
RPS
RPM
NCNT
FCNT
NPHI
FET
RPX
RPD
PEF
DRHO
RHOB
ROP
$
4055.0
4055.0
4055.0
4055.0
4055.0
4055.0
4055.0
4055.0
4065.5
4065.5
4065.5
4078.5
7135.0
7135.0
7135.0
7135.0
7135.0
7135.0
7135.0
7135.0
7135.0
7135.0
7135.0
7135.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
CNP
SLD
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
COMPENSATED NEUTRON
STABILIZED LITHO DEN
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction............... ..Down
Optical log depth units........ ...Feet
Data Reference Point...... ...... ..Undefined
Frame Spacing.................. ...60 .1IN
Max frames per record............ .Undefined
Absent value...................... -999
Depth Units....... . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
30-MAY-Q2
Insite 4.05.5
66.37
Memory
7135.0
48.9
82.2
TOOL NUMBER
PBOO188HWRGV6
PBOO188HWRGV6
PBOO164NL6
PBOO164NL6
8.750
7135.0
LSND
9.20
56.0
8.6
200
7.4
5.400
3.645
5.000
5.200
68.0
104.0
68.0
68.0
)
)
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HR 4 1 68 28 8
NPHI MWD030 PU-S 4 1 68 32 9
FCNT MWD030 CP30 4 1 68 36 10
NCNT MWD030 CP30 4 1 68 40 11
RHOB MWD030 G/CM 4 1 68 44 12
DRHO MWD030 G/CM 4 1 68 48 13
PEF MWD030 B/E 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 4021 7135 5578 6229 4021 7135
ROP MWD030 FT/H 2.8 840.72 286.348 6114 4078.5 7135
GR MWD030 API 11.41 128.27 66.0727 6229 4021 7135
RPX MWD030 OHMM 0.21 65.81 7.08587 6161 4055 7135
RPS MWD030 OHMM 1. 23 63.85 7.14828 6161 4055 7135
RPM MWD030 OHMM 1. 85 2000 8.87965 6161 4055 7135
RPD MWD030 OHMM 0.51 2000 10.0645 6161 4055 7135
FET MWD030 HR 0.09 51. 32 0.834363 6161 4055 7135
NPHI MWD030 PU-S 9.68 71.01 40.842 6161 4055 7135
FCNT MWD030 CP30 402 1283 529.708 6161 4055 7135
NCNT MWD030 CP30 2008 4082.89 2708.53 6161 4055 7135
RHOB MWD030 G/CM 1. 37 3.08 2.22367 6140 4065.5 7135
DRHO MWD030 G/CM -0.11 0.97 0.0975814 6140 4065.5 7135
PEF MWD030 B/E 0.37 6 1.81865 6140 4065.5 7135
First Reading For Entire File......... .4021
Last Reading For Entire File.......... .7135
File Trailer
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation.... ...02/08/14
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.005
Physical EOF
File Header
Service name............ .STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation... ... .02/08/14
Maximum Physical Record. .65535
File Type........... .... .LO
Previous File Name...... .STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPS
PEF
ROP
RPX
5
header data for each bit run in separate files.
9
.5000
START DEPTH
7135.5
7135.5
7135.5
7135.5
STOP DEPTH
11288.5
11261. 0
11337.5
11288.5
RPM
RPD
FET
NPHI
FCNT
NCNT
RHOB
DRHO
GR
$
7135.5
7135.5
7135.5
7135.5
7135.5
7135.5
7135.5
7135.5
7135.5
11288.5
11288.5
11288.5
11247.0
11247.0
11247.0
11261.0
11261.0
11281.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
CTN
SLD
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RES IS. 4
COMP THERMAL NEUTRON
STABILIZED LITHO DEN
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction...... ... ...... ..Down
Optical log depth units....... ... .Feet
Data Reference Point....... ...... .Undefined
Frame Spacing................... ..60 .1IN
Max frames per record........ .... .Undefined
Absent value...................... -999
Depth Units.......................
Datum Specification Block sub-type. ..0
)
13-JUN-02
Insite 4.05.5
66.37
Memory
11340.0
65.8
94.3
TOOL NUMBER
PB00206HAGR4
PB00206HAGR4
PB00201NL4
PB00201NL4
6.125
Baradril-N
9.20
45.0
8.3
18000
4.8
.170
.123
.310
.200
72.0
102.0
72.0
72.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD090 FT/H 4 1 68 4 2
\
}
GR MWD090 API 4 1 68 8 3
RPX MWD090 OHMM 4 1 68 12 4
RPS MWD090 OHMM 4 1 68 16 5
RPM MWD090 OHMM 4 1 68 20 6
RPD MWD090 OHMM 4 1 68 24 7
FET MWD090 HR 4 1 68 28 8
NPHI MWD090 PU-S 4 1 68 32 9
FCNT MWD090 CP30 4 1 68 36 10
NCNT MWD090 CP30 4 1 68 40 11
RHOB MWD090 G/CM 4 1 68 44 12
DRHO MWD090 G/CM 4 1 68 48 13
PEF MWD090 B/E 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 7135.5 11337.5 9236.5 8405 7135.5 11337.5
ROP MWD090 FT/H 5.29 2158.65 348.598 8405 7135.5 11337.5
GR MWD090 API 27.02 114.86 51.7862 8293 7135.5 11281.5
RPX MWD090 OHMM 0.62 30.96 16.9753 8307 7135.5 11288.5
RPS MWD090 OHMM 1.5 31.8 18.1787 8307 7135.5 11288.5
RPM MWD090 OHMM 4.39 38.26 18.3731 8307 7135.5 11288.5
RPD MWD090 OHMM 4.72 49.04 17 . 5182 8307 7135.5 11288.5
FET MWD090 HR 0.11 23.2 0.537452 8307 7135.5 11288.5
NPHI MWD090 PU-S 25.44 45.27 33.2162 8224 7135.5 11247
FCNT MWD090 CP30 152.62 548.55 326.219 8224 7135.5 11247
NCNT MWD090 CP30 15605.6 29289.9 22822.1 8224 7135.5 11247
RHOB MWD090 G/CM 2.03 3.89 2.19503 8252 7135.5 11261
DRHO MWD090 G/CM -0.28 1. 49 0.0587906 8252 7135.5 11261
PEF MWD090 B/E 1.1 11. 81 1.64954 8252 7135.5 11261
First Reading For Entire File......... .7135.5
Last Reading For Entire File.......... .11337.5
File Trailer
Service name......... ... .STSLIB.005
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation.. .... .02/08/14
Maximum Physical Record. .65535
File Type............ ... .LO
Next File Name...... .... .STSLIB.006
Physical EOF
Tape Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .02/08/14
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name............... . UNKNOWN
Continuation Number..... .01
Next Tape Name......... ..UNKNOWN
Comments. . . . . . . . . . . . . . . . . STS LIS
Writing Library. Scientific Technical Services
Reel Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . . 02/08/14
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............ ... . UNKNOWN
Continuation Number..... .01
Next Reel Name.......... . UNKNOWN
Comments. . . . . . . . . . . . . . . . . STS LIS
Writing Library.
Scientific Technical Services
Physical EOF
Physical EOF
)
End Of LIS File