Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout194-060 • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 20, 2012 AUG t 8 L01 Mr. Jim Regg Alaska Oil and Gas Conservation Commission 04-6s 333 West 7 Avenue Anchorage, Alaska 99501 — 1 Subject: Corrosion Inhibitor Treatments of GPMA PM -2 Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPMA PM -2 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, G( Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska ) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) GPMA PM-2 Date: 04/30/2012 Corrosion Vol. of cement Final top of Cement top Corrosion inhibitor/ sealant Well Name PTD # API # Initial top of cement pumped cement off date inhibitor date ft bbls ft na gal P2 -01 1970730 50029227610000 0.3 NA 0.3 NA 1.70 6/22/2009 P2-03 1970440 50029227490000 2.0 NA 2.0 NA 10.20 6/22/2009 P2-04 1981560 50029229070000 1.0 NA 1.0 NA 5.10 6/22/2009 P2-06 1931030 50029223880000 4.0 NA 4.0 NA 30.60 6/22/2009 P2-07 1940580 50029224690000 2.0 NA 2.0 NA 13.60 6/22/2009 P2-08A 2061690 50029228960100 0.8 NA 0.8 NA 4.30 6/21/2009 P2 -09 1980660 50029228760000 0.3 NA 0.3 NA 0.85 6/21/2009 P2 -10 1980970 50029228860000 0.3 NA 0.3 NA 1.70 6/21/2009 P2 -11A 2060260 50029229230100 3.5 NA 3.5 NA 69.70 6/21/2009 P2 -12 1931150 50029223950000 Sealed conductor NA NA NA NA NA P2 -13 1970600 50029227570000 0.5 NA 0.5 NA 2.60 6/21/2009 P2 -14 1981050 50029228880000 1.5 NA 1.5 NA 10.20 6/21/2009 P2 -15A 2070320 50029224090100 Sealed conductor NA NA NA NA NA P2 -16 1931230 50029223970000 3.0 NA 3.0 NA 28.10 6/20/2009 P2 -17 1981370 50029229020000 0.8 NA 0.8 NA 3.40 6/20/2009 -- P2 -18 1940600 50029224710000 0.8 NA 0.8 NA 2.60 6/20/2009 P2 -19A _ 2070120 50029227650100 0.3 NA 0.3 NA 0.90 6/20/2009 P2 -20 1960590 50029226640000 0.5 NA 0.5 NA 2.60 6/20/2009 P2 -21 1940530 50029224670000 0.8 NA 0.8 NA 3.40 6/20/2009 P2 -22 1972490 50029228500000 1.0 NA 1.0 NA 7.70 6/20/2009 P2 -23 1940320 50029224530000 1.3 NA 1.3 NA 11.10 6/20/2009 P2 -24 1980080 50029228540000 1.5 NA 1.5 NA 10.20 6/15/2009 P2 -25 1971110 50029227760000 1.8 NA 1.8 NA 17.90 6/10/2009 P2 -27 1971250 50029227850000 1.3 NA 1.3 NA 8.50 6/10/2009 P2 -28 1950440 50029225510000 3.3 NA 3.3 NA 37.40 4/18/2012 P2 -29 1931470 50029224070000 10.3 NA 10.3 NA 71.40 6/15/2009 P2 -30 1920950 50029222890000 2.8 NA 2.8 NA 17.90 6/10/2009 P2 -31 1940360 50029224560000 2.2 NA 2.2 NA 21.30 6/20/2009 P2 -32 1951350 50029225930000 Surface casing leak NA NA NA NA NA P2 -33B 1972310 50029228120200 2.0 NA 2.0 NA 16.60 6/9/2009 P2 -34 1950660 50029225580000 1.5 NA 1.5 NA 11.50 6/9/2009 P2 -35 1951790 50029226200000 1.0 NA 1.0 NA 13.60 6/9/2009 P2 -36A 2060220 50029228010100 1.1 NA 1.1 NA 6.00 6/9/2009 P2 -37A 2050570 50029225760100 2.0 NA 2.0 NA 23.00 6/9/2009 P2 -39 2111230 50029234540000 0.8 NA 0.8 NA 10.20 4/30/2012 P240 1972260 50029228370000 0.5 NA 0.5 NA 5.10 6/9/2009 P241 1952050 50029226330000 1.5 NA 1.5 NA 17.00 6/9/2009 P2-42 1931430 50029224050000 19.3 NA 19.3 NA 121.60 6/20/2009 P243 2050240 50029232500000 0.8 NA 0.8 NA 6.00 6/8/2009 P2-44 1960630 50029226660000 2.3 NA 2.3 NA 23.80 6/8/2009 P2-45B 2080210 50029227690200 0.8 NA 0.8 NA 5.10 6/8/2009 P246 1931320 50029224010000 2.3 NA 2.3 NA 25.50 6/8/2009 P247 1951900 50029226280000 0.0 NA 0.0 NA NA NA P248 1921260 50029223090000 0.2 NA 0.2 NA 1.70 4/18/2012 P249 1920240 50029222520000 2.5 NA 2.5 NA 18.70 6/7/2009 P2 -50B 1950960 50029222610200 2.0 NA 2.0 NA 23.00 6/8/2009 P2 -51 1920380 50029222620000 0.3 NA 0.3 NA 0.85 6/7/2009 P2 -52 1972010 50029228260000 3.8 NA 3.8 NA 47.60 6/7/2009 P2 -53 1960410 50029226560000 2.0 NA 2.0 NA 21.30 6/7/2009 P2 -54A 2030300 50029224700100 0.8 NA 0.8 NA 3.40 6/7/2009 P2 -55 1920820 50029222830000 4.0 NA 4.0 NA 79.90 6/22/2009 P2 -56 1951620 50029226100000 2.8 NA 2.8 NA 17.90 6/7/2009 P2 -57A 2022140 50029221830100 15.5 NA 15.5 NA 77.40 6/22/2009 P2 -58 1900080 50029220000000 Sealed conductor NA NA NA NA NA P2-59A 1982010 50029220960100 Sealed conductor NA NA NA NA NA P2-60 1910910 50029221920000 8.3 NA 8.3 NA 56.10 3/13/2012 I tl¿ Lj/lòl66 STATE OF ALASKA _ ALAS.L AND GAS CONSERVATION C~ISSION RECEIVED REPORT OF SUNDRY WELL OPERATIONS PiLAR 2 4 Z006 1. Operations Performed: o Abandon 181 Alter Casing o Change Approved Program 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 8. Property Designation: ADL 365548 11. Present well condition summary Total depth: measured Effective depth: true vertical measured true vertical Casing Structural Conductor Surface Intermediate Production Liner Length 80' 4290' 13287' Perforation Depth MD (ft): Perforation Depth TVD (ft): o Suspend 181 Repair Well 181 Pull Tubing 46.72' 13335 9222 13237 9162 o Operation Shutdown o Plug Perforations o Perforate New Pool ission o Perforate o Stimulate o Waiver o Other Anchorage o Re-Enter Suspended Well o Time Extension 4. Current Well Class: 181 Development 0 Exploratory o Stratigraphic 0 Service 5, Permit To Drill Number: 194-060 6. API Number: 50-029-22471-00-00 99519-6612 9. Well Name and Number: PBU P2-18 10. Field / Pool(s): Prudhoe Bay Field / Point Mcintyre Pool feet feet Plugs (measured) None feet Junk (measured) None feet Size MD TVD Burst Collapse 20" 110' 110' 1490 470 10-3/4" 4324' 3708' 5210 2480 7-518" 13318' 9212' 6890 4790 ª\;t~W~t;, 12906' - 13086' 8956' - 9068' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl 17. t at t e oregolng IS true an Brandon Peltier, 564-5912 Printed Name Terrie Hubble 4-1/2", 12.6# 13Cr 12804' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): 7-5/8" x 4-1/2" Baker 'SABL-3' packer; 7-5/8" x 4-1/2" Baker 'S-3' packer; 4-1/2" HXO SSSV 12722'; 12672'; 2200' Treatment description including volumes used and final pressure: Cut and pull 7-5/8" casing from 3320' run 7-5/8" tieback from surface to 3357'. Cement to surface with 667 sx Class 'G'. 13. Prior to well operation: Subsequent to operation: 14, Attachments: Re resentative Dail Avera e Production or In'ection Data Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure 15, Well Class after proposed work: o Exploratory 181 Development 0 Service 16. Well Status after proposed work: 181 Oil 0 Gas 0 WAG 0 GINJ 0 WINJ 0 WDSPL correct to the best 0 my nowe ge. Sundry Number or N/A if C.O. Exempt: 306-026 o Copies of Logs and Surveys run 181 Daily Report of Well Operations DWell Schematic Diagram Title Technical Assistant Signature Form 10-404 Revised 04/2004 Prepared By Name/Number: Terrie Hubble, 564-4628 Submit Original Only Phone e e Accept: Spud: Release: Ri: 03/05/06 N/A 03/18/0 Nabors 7ES PRE-RIG WORK 02/04/06 RAN FLAPPER CHECKER TO 2178' SLM, UNABLE TO FUNCTION TRSSSV. PARRAFIN ON TOOLS. RAN 3.70" DRIFT TO 12,674' SLM, UNABLE TO WORK THRU OBSTRUCTION. HUNG UP IN TRSSSV WHILE POOH, HAD LRS PUMP HOT DIESEL, APPEARED TO BE AN ICE PLUG IN CONTROL LINE. PRESSURE UP ON CONTROL LINE AGAIN, HOLDING GOOD. GIVE WELL BACK TO DSO, LEAVE SI. 02/06/06 MU I RIH WITH 2.13" MOTOR AND 3.80" 3-BLADE JUNK MILL. TOOK 2.5 HRS TO GET TO 800' (NOT SURE IF IT WAS HEAVY PARAFFINS OR PACK-OFF PROBLEMS I NO MOTOR WORK OBSERVED). SAW A LITTLE MOTOR WORK AT 4900',12,588' AND 12595' CTMD, TAGGED XN NIPPLE (12,772' MD) AT 12716' CTMD, +56' CORRECTION. FLAG PIPE 12690' CORRECTED, POOH, 02/07/06 POOH WITH MILL. NO VISIBLE WEAR. LD MOTOR AND MILL. PU AND RIH WITH 3,595" OD COMPOSITE BRIDGE PLUG, SET DOWN IN SAFETY VALVE AND PLUG SET. DROP BALL TO GET HARD SET AND RELEASE. POOH FOR MOTOR AND MILL. MU I RIH WITH MOTOR/3.80" MILL. MILL ON PLUG FROM 2199.8' TO 2201,1', LITTLE PROGRESS, POH. VERIFY SSSV IN OPEN POSITION. RIH W 12.70 MILL AND CUT THRU PLUG AND PUSH TO 2220' CTMD. POH LD 2.70" MILL. PU 3.80" MILL. RIH TO 4828' CTMD AND SET DOWN. GET MOTOR TURNING AND EASILY PUSH PLUG TO 7562'. MAKE SIMPLE WT CK AND GET HUNG UP AND MOTOR STALLED. WORK TO GET FREE AND POOH TO INSPECT TOOLS. 02/08/06 OOH WITH TOOLS, WEAR ON LEADING EDGE OF MILL. EVIDENCE OF DEBRIS BESIDE MILL. LD TOOLS. CUT 50' OF PIPE, MU JARS, NEW MOTOR AND 3,80" MILL. FLUSH TBG WITH 195 BBLS AT 5,1 BPM. RIH WITH 3.80" MILL PUMPING LUBTEX. MADE IT XN NIPPLE AT 12772'. NO OBSTRUCTIONS, POOH FP WELL TO 2500'. RDMO. NOTIFY DSO OF WELL SI STATUS. COIL JOB COMPLETE READY FOR ELINE. 02/11/06 STRING SHOT RAN: 12710' -12722'. (PLANNED CUT = 12716', 3 FT BELOW PUP COLLAR ABOVE PACKER). TUBING PUNCHER - 2 FT (4 SPF) SHOT AT 12,670'. BAKER QUICKDRILL PLUG SET AT 12757' CCL STOP DEPTH = 12749.25'. 02/12/06 CHEMICAL CUT TUBING AT 12725'. CCL STOP DEPTH = 12705,7'. EXPERIENCED SOME TROUBLE GETTING DOWN PAST GLM #7, HAD TO INCREASE SPEED TO 120 FPM TO GET THROUGH GLM. ALSO EXPERIENCED SLIGHT TROUBLE COMING BACK THROUGH GLM #7, HAD TO MAKE A COUPLE OF PASSES. JOB COMPLETE, 02/13/06 T/I/O= 200/750/540 TEMP= SI CIRC OUT WELL W/1% KCL, CMIT TX IA TO 3500 PSI PASSED (PREP RWO) PUMPED DOWN TBG TAKING RETURNS UP THE IA THRU JUMPER LINE TO FLOWLINE, SPEARED IN W/5 BBLS OF METH FOLLOWED BY 830 BBLS OF 1% KCL. FREEZE PROTECTTX IA. PUMPED 3 BBLS METH, 92 BBLS OF DIESEL, 1 BBL METH DOWN TBG. U-TUBE TX IA. FREEZE PROTECT FLOWLINE W/7 BBLS OF METHANOL PSI UP ON IGV 1400 PSI PER DSO. CMIT TX IA TO 3500 PSI PRESSURE UP TX IA WI 6.3 BBLS OF DIESEL. START TEST. 1ST 15 MINS TII LOST 50/80 PSI, 2ND 15 MINS TII LOST 40/120 PSI FOR A TOTAL OF 90/200 PSI IN 30 MIN TEST, FAIL. REPRESSURE T X IA WI 0.3 BBLS DIESEL. START 2ND TEST. 1ST 15 MINS LOST 0/40 PSI 2ND 15 MIN LOST 2010 PSI FOR A TOTAL OF 20/40 PSI IN 30 MIIN BLEED TBGXIA PSI OFF BLEED BACK 7 BBLS BLEED OA PSI OFF BLEED BACK 1 BBL THEN SW APED TO GAS. UNABLE TO BLEED GAS TO SLOP TRAILER, BAD WIND DIRECTION, TRIED BLEEDING OA DOWN F-LlNE. BLEED TO HEADER PSI 200 PSI STILL GAS, RE-F-PROTECT F-LlNE W/5BBLS OF METH FINAL WH P' S=1 00/120/200, Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date P2-18 P2-18 WORKOVER NABORS ALASKA DRILLING I NABORS 7ES Start: Rig Release: Rig Number: 3/4/2006 3/18/2006 7ES Spud Date: 5/30/1994 End: 3/18/2006 3/4/2006 19:00 - 20:00 1.00 MOB P PRE Prep mud pits to move, Move mud pits away from sub base, 20:00 - 22:30 2.50 MOB P PRE Move sub base off of well PM2-01. Lay mats spread herculite. Place tree in cellar. Move in and spot and level sub base over well PM2-18, 22:30 - 23:30 1,00 MOB P PRE Lat mats. Spot mud pits and cuttings tank. Hook up uti lite lines 23:30 - 00:00 0,50 RIGU P PRE Berm in cuttings tank. Rig up and blow air thru lines to ensure they are clear. Take fluid on in the mud pits 3/5/2006 00:00 - 02:00 2,00 RIGU P PRE Continue to berm in cuttings tank, Rig up and blow air thru lines to ensure that they are clear. Take fluid on in the mud pits. 02:00 - 02:30 0,50 WHSUR P DECOMP Pre spud meeting with all personal involed, Rig accepted at 02:00 hours 3/5/2006, 02:30 - 03:30 1,00 WHSUR P DECOMP Check tubing pressure 0 psi. Annulus pressure 0 psi. Rig up and pull BPV with DSM lubricator. Rig up lines to circulate freeze protect out of the well bore, 03:30 - 08:00 4.50 KILL P DECOMP Pressure test lines to 3000 psi. Reverse circulate out freeze protection from tubing, pumping 38 bbl of 120 degree 9.2 ppg KCL brine, Circulating thur choke taking returns out to the cuttings tank at 125 gpm at 225 psi. until returns clean up, Circulate down the tubing taking returns out the annulus until a 9,2 ppg is acquired in and out of the hole. Verify well is dead. Recovering 92 bbls of diesel. 08:00 - 08:30 0,50 KILL P DECOMP Blow down lines and install TWC and test from below to 1000 psi. 08:30 - 10:00 1,50 BOPSU DECOMP Terminate control line. Nipple down tree and adapter flange. Verify hanger threads, 10:00 - 11 :30 1,50 BOPSU DECOMP Nipple up BOP 11 :30 - 13:30 2,00 BOPSU DECOMP Install test joint and rig up test equipment. Fill stack with water 13:30 - 17:00 3,50 BOPSU DECOMP Test BOP, Choke manifold and all assoicated valves to 250 psi low for 5 minutes and 3500 psi high for 5 minutes, Unable to test lower pipe rams, height interference of cross over on test joint. BOP test wittinessed by AOGCC rep John Spalding, WSL Lance Vaughn, Nabors Tool Pusher Larry Wurdeman 17:00 - 18:00 1,00 BOPSU P DECOMP Rig down and blow down test equipment. Remove test plug, 18:00 - 19:00 1,00 WHSUR P DECOMP Rig up DSM and pull TWC valve with lubricator. 19:00 - 20:00 1.00 PULL P DECOMP Pick landing joint and screw into hanger. Back out lock down screws and pull hanger to the rig floor. Monitor well for 10 minutes, well static, Hanger came off seat at 135K up weight, tubing came free at 20K overpull the calculated string weight. Up weight 150K 20:00 - 21 :00 1,00 PULL P DECOMP Circulate 110 degree 9,2# KCL fluid at 378 gpm 830 psi. Pumping one drum of Safe Surf-O, KCL weight in 9,2 ppg Out 9,2 ppg 21 :00 - 22:00 1,00 PULL P DECOMP Lay down landing joint and tubing hanger. Rig up Schlumberger control line spooling unit and Torque turn equipment. 22:00 - 00:00 2,00 PULL P DECOMP Lay down 4-1/2' 12,6# 13 Cr-80 NSCT tubing 3/6/2006 00:00 - 02:00 2.00 PULL P DECOMP Lay down 4-1/2' 12,6# 13 Cr-80 NSCT tubing to 2201', Lay down the SSSV. Recovered 29 stainless steel control line bands. 02:00 - 02:30 0.50 PULL P DECOMP Rig down Schlumberger control line spooling unit. Printed: 3/20/2006 12: 11 :09 PM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P2-18 P2-18 WORKOVER NABORS ALASKA DRILLING I NABORS 7ES Start: 3/4/2006 Rig Release: 3/18/2006 Rig Number: 7ES Spud Date: 5/30/1994 End: 3/18/2006 DECOMP I Continue laying down 4-1/2" 13 Cr-80 NCST tubing, Recovered 326 joints + a 8,80' cut off. 7 GLM and 1 X-Nipple. 15:00 - 16:00 1.00 DECOMP Rig down torque turn equipment and clean floor. 16:00 - 17:30 I 1,50 DECOMP Rig up test equipment ,Install test plug.Test lower pipe rams to 250 psi 5 minute low, 3500 psi 5 minute high. Rig down test equipment, pull test plug and install wear bushing, 17:30 - 21 :00 3.50 CLEAN P DECOMP Rig down long bails, install short bails on top drive. Pick up BHA #1 6-3/4" dressing mill. 21 :00 - 22:30 1 ,50 CLEAN P DECOMP Pick up 4" HT-40 drill pipe from 954' to 3321', 22:30 - 23:30 1,00 CLEAN P DECOMP Cut and slip 118' of drilling line. Service top drive and crown. 23:30 - 00:00 0.50 CLEAN P DECOMP Pick up 4" HT-40 drill pipe from 3321' to 3732'. 3/7/2006 00:00 - 05:30 5.50 CLEAN P DECOMP Pick up 4" HT-40 drill pipe from 3732' to 8952', Picked up a total of 252 joints of 4" HT-40 drill, Rabbiting all drill pipe picked up. 05:30 - 08:30 3.00 CLEAN P DECOMP Run in the hole with 4" HT-40 drill pipe from the derrick from 8952' to 12715'. Tagging tubing stub at 12715', 08:30 - 09:00 0.50 CLEAN P DECOMP Dress 4-1/2" tubing stub from 12715' to 12722', Pumping Hi-Vis sweeps as nedded at 250 gpm at 1206 psi. Up weight 200K, Slack off weight 150K, Rotating weight175K 40 RPM 5K off bottom and 6K on bottom, 09:00 - 10:00 1.00 CLEAN P DECOMP Circulate Hi-Vis sweep surface to surface at 350 gpm at 2118 psi. Mud weight in 9,2 ppg Out 9,2 ppg, 10:00 - 16:30 6.50 CLEAN P DECOMP Monitor well bore for 10 minuites. Remove blower hose, Pull out of the hole from 12722' to 954'. 16:30 - 18:00 1.50 CLEAN P DECOMP Stand back 4" HW drill pipe and 4-3/4" drill collars, Lay down BHA #1, Dressing mill, extension,4-3/4" inner dressing mill, float sub, 2 boot baskets, 7-5/8" scraper, bumper sub, oil jar, and pum out sub. Both boot baskets were empty. 18:00 - 18:30 0,50 DHEQP P DECOMP Rig up Schlumberger wire line, Function test BOP. 18:30 - 00:00 5,50 DHEQP P DECOMP Run in the hole to 12600' with USIT log and begin logging up. 3/8/2006 00:00 - 07:00 7.00 DHEQP P DECOMP Continue to log the well bore with Schlumbeger USIT log to surface. Rig wire line back out of the way. 07:00 - 07:30 0,50 CLEAN P DECOMP Rig up and test 7" casing to 3500 psi for 30 minutes, 07:30 - 08:00 0.50 DHEQP P DECOMP Rig down Schlumberger wire line, 08:00 - 12:00 4.00 DHB P DECOMP Run in the hole with 7-5/8" Halliburton Retrievable Bridge plug to 5235'. 12:00 - 14:00 2,00 DHB N WAIT DECOMP Consulting with Anchorage team to determine setting depth of Retrievable Bridge plug and Evaluating USIT logs to determine the depth of 7-5/8" casing to be cut. 14:00 - 15:00 1.00 DHB P DECOMP Run in the hole with 7-5/8" Halliburton Retrievable Bridge plug and set at 5872', 15:00 - 16:00 1.00 DHB P DECOMP Pull two stands of 4" HT-40 drill pipe and dump 800 pounds of 12/20 sand on top of Bridge plug,equivalent to 30' in casing, Pull out of sand one stand slowly and circulate 1 drill pipe volume at 187 gpm 230 psi. 16:00 - 18:30 2.50 DHB P DECOMP Pull out of the hole with Halliburton Bridge plug setting tool and lay down setting tool. 18:30 - 19:30 1.00 CLEAN P DECOMP Pick up BHA #2, Bakers Multi string cutter, box sub, string stabilizer, box sub, 9 drill collars, cross over, 21 heavy weight drill pipe. Printed: 3/20/2006 12: 11 :09 PM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P2-18 P2-18 WORKOVER NABORS ALASKA DRILLING I NABORS 7ES Start: 3/4/2006 Rig Release: 3/18/2006 Rig Number: 7ES Spud Date: 5/30/1994 End: 3/18/2006 3/8/2006 18:30 - 19:30 1,00 CLEAN P DECOMP Function test BOP, 19:30 - 21:00 1 .50 CLEAN P DECOMP Run in the hole with Bakers Multi string cutter to 3339', 21 :00 - 00:00 3.00 CLEAN P DECOMP ¡Install blower hose on Top Drive. Attempt to locate 7-5/8" ,casing collar from 3305' to 3400' to correlate with wire line USIT log. Pull out of the hole from 3209' to 3305' unsuccessful in locating casing collar. Up weight 85K, Slack off weight 80K 3/9/2006 00:00 - 00:30 0.50 CLEAN P DECOMP Cut 7-5/8 casing at 3320' per drill pipe measurment at 40 RPM 2K torque 5 bpm at 1188 psi. Indication of casing cut by a loss of 400 psi in pump pressure. Verified by setting 5K down, 00:30 - 05:00 4,50 CLEAN P DECOMP Close Hydril and pump down drill pipe circulating thur the 7-5/8" x 10-3/4" annulus taking returns thur the choke to tigar tank until a 9.2 ppg KCL fluid is acquired, Pumped the volume of the 7-5/8" x 10-314" annulus followed by a 50 bbl sweep with Safe-O-Surf at 2 bpm 485 psi. Shut pumping operations down, blow down hard line to cuttings tank, commence pumping operations taking returns into mud pits thur the gas buster. Monitor well to verify that well is dead, Took 22 bbls to get returns to tigar tank. Once returns little or no gas was encountered. Recovered + - 30 bbls of diesel. 05:00 - 07:30 2.50 CLEAN P DECOMP Pull out of the hole with Bakers Multi string cutter and lay down the same. Good indication on casing cutter blades that casing is cut. 07:30 - 09:00 1.50 BOPSU P DECOMP Drain stack, pull wear ring, install test plug with test joint and change top rams to 7-5/8". Test door seals to 3500 psi. Rig down test joint and pull test plug, 09:00 - 11 :00 2.00 FISH P DECOMP Make up Baker spear and engauge 7-5/8" casing, Back out lock down screws, 7-5/8" mandral pack off pulled free at 150K and 7-5/8" casing pulling free at 115K. 11 :00 - 11 :30 0,50 CLEAN P DECOMP Circulate bottoms up at 385 gpm at 160 psi. Mud weight in 9,2 ppg, Out 9,2 ppg 11 :30 - 12:00 0,50 CLEAN P DECOMP Release spear from 7-5/8" casing and lay down spear. 12:00 - 13:00 1,00 CLEAN P DECOMP Lay down hanger and mandral packoff. Rig up casing equipment. Break out torque on hanger 25K, 13:00 - 20:30 7.50 CLEAN P DECOMP Lay down 7-5/8" 29,7# NSCC Casing, Recovered 80 joints and 3.95' cut off joint. Top of 7 5/8" cut off at 3320' Noted 1/2" thick cement covering 40 % of last joint of casing, Average break out torque on joints 1 thru 76 was 25K to 40K, Egged 5 joints of 7-5/8" casing where the break out torque exceeded 40K, Break out torque on joints 76 to 80 averaged 25K. 20:30 - 21 :00 0,50 CLEAN P DECOMP Rig down casing equipment and clean floor, 21 :00 - 23:30 2,50 BOPSU P DECOMP Install test plug and remove 7-5/8" rarns, install 3-1/2"x6" rams and test upper BOP door seals to 3500 psi. Remove test plug, 23:30 - 00:00 0,50 CLEAN P DECOMP Pick up BHA #4,9-7/8" junk mill, cross over sub, 10-3/4" scraper, 8" boot basket, 7" boot basket, bit sub, bumper sub, oil jar, cross over sub, 9 6-112" drill collars, cross over sub, intensifire; cross over sub, 3/10/2006 00:00 - 03:00 3,00 CLEAN P DECOMP Continue to pick up mill and 10 3/4" casing scraper BHA #4, Change out handling equipment. 03:00 - 05:00 2,00 CLEAN P DECOMP Run in the hole with BHA #4. Tagging top of 7-5/8" casing stub at 3320' Printed: 3/20/2006 12: 11 :09 PM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P2-18 P2-18 WORKOVER NABORS ALASKA DRILLING I NABORS 7ES Start: 3/4/2006 Rig Release: 3/18/2006 Rig Number: 7ES Spud Date: 5/30/1994 End: 3/18/2006 3/10/2006 05:00 - 06:00 1.00 CLEAN P DECOMP Circulate sweep surface to surface at 296 gpm at 411 psi. Cement and some solids returned with sweep. 06:00 - 07:30 1,50 CLEAN P DECOMP POOH with mill and 103/4" casing scraper BHA #4, 07:30 - 09:30 2.00 CLEAN P DECOMP Lay down BHA #4,9-7/8" junk mill, 10-3/4" casing scraper and 2 boot baskets, Note. Boot Baskets were empty 09:30 - 12:00 2,50 CLEAN P DECOMP Pick up BHA #5. 9-5/8" mill shoe, 2 joints of 9-5/8" wash pipe, drive sub, 2 boot baskets. Change out handling equipment. 12:00 - 18:00 6,00 CLEAN P DECOMP Run in the hole with BHA #5. Tagging top of 7-5/8" casing stub at 3320'. Up weght 100K, Slack off weight 80K, Rotating weight 90K, 18:00 - 20:30 2,50 CLEAN P DECOMP Wash over top of 7-5/8" from 3320' to 3381',70 rpm 7 to 12K torque, 425 gpm at 900 psi. Picked up above casing stub unable to work 9-5/8" mill shoe and wash pipe back over 7-5/8" casing stub, 20:30 - 21 :30 1.00 CLEAN P DECOMP Pump sweep and circulate hole clean at 425gpm at 1025 psi. Weight of Brine in 9,2 ppg, Out 9.2 ppg, Note + - 2 bbl of cement cuttings once sweep can back to surface. 21 :30 - 23:00 1.50 CLEAN P DECOMP Monitor well bore for 10 minutes. Pull out of the hole with BHA #5, Stand back HW drill pipe and 6-1/2" drill collars, 23:00 - 00:00 1.00 CLEAN P DECOMP Lay down BHA #5, Jars, Bumper Sub, and 2 Boot Baskets, 3/11/2006 00:00 - 01 :30 1.50 CLEAN P DECOMP Continue to lay down BHA #5, 2 Joints of 9-5/8" Wash Pipe and 9-5/8" Mill Shoe. Both boot baskets full of metal, recovering + - 15 pounds of metal. Found one cutter between water course on the mill shoe was rolled to the inside of the mill, 01 :30 - 02:30 1,00 CLEAN P DECOMP PJSM with Schlumberger personal. Rig up Schlumberger wire line, 02:30 - 03:00 0.50 CLEAN N DFAL DECOMP Change out firing head on wire line, Function test BOPs, 03:00 - 07:00 4.00 CLEAN P DECOMP Run in the hole with a Collar locater and a 12 foot string shot dressed with 3 strands of deck cord, Unable to go past 3296' WLM, Pull out of the hole and bend string shot strip slightly, Run in the hole with string shot to a WLM of 3317' making several attempts to pass 3317' no luck. Pull out of the hole with collar locater and string shot. Rig down Schlumberger wire line, 07:00 - 08:30 1,50 CLEAN P DECOMP Pick up BHA #6,6-118" Tapered String Mill, 6-3/4" String Mill, Double Pin Sub, 2 Boot Baskets, Bit Sub, Bumper Sub, Oil Jars, 9 Drill Collars, Cross Over and 21 Heavy Weight Drill Pipe. 08:30 - 10:30 2,00 CLEAN P DECOMP Run in the hole with BHA #5, tagging 7-5/8" casing stub at 3320'. Establish circulating rate of 300 gpm at 700 psi. Up weight 90K, Slack Off weight 85K, Rotating weight 90K. Continue running in the hole to 3685'. Note No difficulty entering the 7-58" casing at 3320'. 10:30 -11:00 0,50 CLEAN P DECOMP Circulate bottoms up at 300 gpm 700 psi. Brine weight In 9,2 ppg, Out 9,2 ppg. 11 :00 - 13:00 2.00 CLEAN P DECOMP Pull out of the hole with BHA #6. 13:00 - 13:30 0.50 CLEAN P DECOMP Lay down BHA #6,Tapered String Mill, 6-3/4" String Mill, Double Pin Sub, 2 Boot Baskets, Bit Sub, Bumper Sub, Oil Jars, Printed: 3/20/2006 12: 11 :09 PM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P2-18 P2-18 WORKOVER NABORS ALASKA DRILLING I NABORS 7ES Start: Rig Release: Rig Number: 3/4/2006 3/18/2006 7ES Spud Date: 5/30/1994 End: 3/18/2006 scription 3/11/2006 13:00 - 13:30 0.50 CLEAN P DECOMP Note: Both Boot Baskets were empty, 13:30 - 14:30 1.00 CLEAN P DECOMP PJSM with Schlumberger personal. Rig up Schlumberger wire line, 14:30 - 16:30 2.00 CLEAN P DECOMP Run in the hole with a Collar locater and a 12 foot string shot dressed with 3 strands of deck cord to 3357' WLM, Locating 7-5/8" casing collar at 3357' WLM. String shot fired 6' above 3357' and 6' below 3357'. Pull out of the hole with wire line. 16:30 - 17:00 0.50 CLEAN P DECOMP Rig down Schlumberger wire line. 17:00 - 19:30 2,50 CLEAN P DECOMP Run in the hole with 3 stands of 4-3/4" Drill Collars and pick up BHA #7, Blanking Sub, Cross Over, Lower Back Off Slip Housing, Back Off Power Section, Upper Back off Slip Housing, Pump Out Sub, Cross Over and 7 stands of 4" Heavy Weight Drill Pipe, 19:30 - 22:00 2.50 CLEAN P DECOMP Run in the hole with BHA #7 to 3650'. Filling drill pipe every 5 stands with fresh water, 22:00 - 23:00 1.00 CLEAN P DECOMP Pressure up to 1000 psi to set lower anchor on back off tool at 3348', setting 5K down to verify lower anchor set. Pressure up to 2500 psi to set upper anchor on back off tool at 3369', setting 10K down to verify upper anchor set. Pressure up to 1500 psi and observe pressure drop to 550 psi after 5-1/4" left hand turns turns, Cycle tool per Baker representative. Back off 7-518" casing at 3359' 23:00 - 00:00 1,00 CLEAN P DECOMP Rig down and blow down lines, Drop dart and shear pump out sub at 2450 psi. Circulate bottoms up at 250 gpm 300 psi. 3/12/2006 00:00 - 00:30 0.50 CLEAN P DECOMP Pump dry job, Monitor the well bore for 10 minutes. 00:30 - 02:00 1 .50 CLEAN P DECOMP Pull out of the hole with BHA #7 02:00 - 03:00 1.00 CLEAN P DECOMP Lay down BHA #7, Pump Out Sub, Upper Slip Housing Back Off Power Section, Lower Slip Housing, Cross Over Sub, Blanking Sub. 03:00 - 04:30 1.50 CLEAN P DECOMP Pick up BHA #8, Bull Nose, Itco Spear, 2 Extensions, Stop Sub w/8-1/4" Stop Ring, Cross Over Sub, Bumper Sub, Oil Jar, Cross Over Sub and 7 stands of 4" heavy weight drill pipe. 04:30 - 06:00 1,50 CLEAN P DECOMP Run in the hole with BHA #8, Engauge casing stub, Finish backing out 7-5/8" casing stub 7 left hand turns, Up weight 85K, Slack Off weight 82K, Rotating weight 82K. 06:00 - 07:00 1,00 CLEAN P DECOMP Pull out of the hole with BHA #8. 07:00 - 10:00 3,00 CLEAN P DECOMP Lay down BHA #8, Oil Jars, Bumper Jars, Cross Over Sub, Stop Sub, Extensions, Itco Spear, Recovered 37,37" of 7-5/8" casing stub with pin down, Theards on pin in good shape. 10:00 - 12:00 2,00 CLEAN P DECOMP Pull wear ring and install test plug. Rig up test equipment. Fill BOP with fresh water, Test plug not retainig fluid. Pull test plug and change out seal. Install test plug fill BOP with fresh water, test plug still not holding fluid, 12:00 - 13:00 1,00 CLEAN N WAIT DECOMP Wait on FMC to deliver test plug. 13:00 - 18:30 5,50 CLEAN P DECOMP Test BOP, Choke manifold and all assoicated valves to 250 psi low for 5 minutes and 3500 psi high for 5 minutes, Wittiness of BOP test wavied by AOGCC rep Chuck Sheve. Wittnessed by WSL Duncan Ferguson, Nabors Tool Pusher Larry Wurdeman, 18:30 - 19:00 0,50 CLEAN P DECOMP Rig down test equipment. 19:00 - 20:00 1,00 CLEAN P DECOMP Change upper pipe rams to 7-5/8", Test door seals to 3500 psi. Remove test plug, Printed: 3/20/2006 12: 11 :09 PM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P2-18 P2-18 WORKOVER NABORS ALASKA DRILLING I NABORS 7ES Start: 3/4/2006 Rig Release: 3/18/2006 Rig Number: 7ES Spud Date: 5/30/1994 End: 3/18/2006 3/12/2006 20:00 - 21 :00 1,00 CLEAN P DECOMP Cut and Slip drilling line, Inspect and adjust brakes, 21 :00 - 23:00 2,00 CASE P ITIEB1 Rig up 7-5/8" torque turn equipment. 23:00 - 00:00 1,00 CASE P ITIEB1 Make up 9-5/8" guide shoe to Bakers screw in sub 7-5/8" I NSCC pin looking down, TAM Port Collar, Run in the hole with 7-5/8" 29.7 L-80 Vam Top Casing. 3/13/2006 00:00 - 06:00 6.00 CASE P ITIEB1 Continue to run in the hole with 7-5/8" 29,7 L-80 Vam Top I Casing. Running 75 7-5/8" x 9-5/8" straight bladed free floating I centilizers on joints 2 thru 76. I I Average make up torque 14450 foot pounds, 06:00 - 07:00 1,00 CASE P ITIEB1 Establish up and down weights 115K Up, 11 OK Down, Washdown while pumping slowly at 120 gpm at 40 psi. Engage I screw in sub with 7-5/8" pin, working torque down hole to screw I in sub, applying 10-1/2 turns to 7-5/8" at 14450 foot pounds of torque, Getting a 1/2 turn back at surface. Pull test 7-5/8" I casing to 200K, Slack off to down weight and test 7-5/8" casing to 3500 psi for 30 min. 07:00 - 12:30 5,50 CASE P TIEB1 Drain BOP stack of fluid, pull master bushings, pull flow riser and secure, Nipple down BOP, split the stack at the casing spool and tubing spool. Install 7-5/8" emergency slips and energize with 100K down weight. Cut 7-5/8" casing with Wachs cutter, Install 7-5/8" mandral pack off, run in lock down screws, Nipple up BOP and test pack off to 3500 psi for 15 minutes, 12:30 - 15:00 2.50 CASE P TIEB1 Remove 7-5/8" rams and install 3-1/2" x 6" rams in BOP and test to 3500 psi. Rig down test equipment, pull test plug and install wear bushing, 15:00 - 17:30 2.50 CASE P TIEB1 Make up Tam Combo tool with cross over and run in the hole with 4" HT-40 drill pipe to 3353'. 17:30 - 18:00 0.50 CEMT P TIEB1 Tag up on Tam port sliding sleeve at 3353'. Make up pump in sub to drill string and rig up hoses. 18:00 - 19:00 1,00 CEMT P TIEB1 Open Tam port sliding sleeve and circulate at 325 gpm 845 psi. While Schlumberger batch mixs cement. 19:00 - 20:30 1,50 CEMT P TIEB1 PJSM w/ all personal involed, Pump 10 bbls fresh water, test lines to 4000 psi. Pump 139 bbls, of 15,8 ppg class "G" 1st stage cement followed by 5 bbls of fresh water down drill pipe through the tam port collar at 3353', Taking returns out the 7-5/8" x 10-3/4" annulus valve to pits. Displace cement with rig, pumping 26 bbl 9,2 ppg brine, Getting back 3 bbls of cement. Final displacement rate 15 gpm at 980 psi. Under displacing cement by 2 bbls. Close Tam Port sliding sleeve and pressure up to 1000 psi to confrim Tam Port closed. Release from dog sub taking 5 turns, Pick up 5'. CIP at 20:30 hours Sent sample to Schlumberger for UCA analysis, 20:30 - 21 :00 0,50 CEMT P TIEB1 Shear circulating port on dog sub with 1900 psi. Circulate bottoms up getting back 2 bbls of cement. 21 :00 - 21 :30 0,50 CEMT P TIEB1 Close Hydril and attempt to test 7-5/8" casing to 3500 psi while monitoring the outer anulus. Unable to pressure up past 360 psi. Bleed off pressure, 21 :30 - 22:00 0,50 CEMT P TIEB1 Circulate bottoms up, getting back 1 bbl of cement and + - 72 bbl cement contaminated brine. 22:00 - 22:30 0,50 CEMT P TIEB1 Dog back into Tam Port sliding sleeve and reclose. Close Hydril and test 7-5/8 casing to 3500 psi for 10 minutes while monitoring the outer anulus, Bleed off pressure, Release from Printed: 3/20/2006 12:11:09 PM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P2-18 P2-18 WORKOVER NABORS ALASKA DRILLING I NABORS 7ES Phase 3/13/2006 22:00 - 22:30 0.50 CEMT P TIEB1 22:30 - 00:00 1,50 CEMT P TIEB1 3/14/2006 00:00 - 01 :30 1,50 CEMT P TIEB1 01 :30 - 04:00 2.50 CEMT P TIEB1 04:00 - 05:30 1,50 CEMT P TIEB1 05:30 - 07:30 2.00 CEMT P TIEB1 07:30 - 10:00 2.50 CEMT P TIEB1 10:00 - 11 :00 1.00 CEMT P TIEB1 11 :00 - 12:00 1.00 CEMT P TIEB1 12:00 - 14:00 2,00 CEMT P TIEB1 14:00 - 14:30 0.50 CEMT P TIEB1 14:30 - 16:00 1.50 CEMT P TIEB1 16:00 - 18:30 2,50 CEMT P TIEB1 18:30 - 19:30 1,00 CEMT P TIEB1 19:30 - 20:00 0.50 CEMT P TIEB1 20:00 - 20:30 0.50 CEMT P TIEB1 20:30 - 22:30 2,00 EV AL P TIEB1 22:30 - 23:30 1,00 EVAL N SFAL TIEB1 23:30 - 00:00 0,50 EVAL P TIEB1 3/15/2006 00:00 - 02:00 2,00 EVAL P TIEB1 02:00 - 02:30 0,50 EVAL P TIEB1 02:30 - 03:00 0,50 EVAL P TIEB1 03:00 - 10:00 7,00 EVAL P TIEB1 10:00 - 10:30 0.50 CASE P TIEB1 10:30 - 14:00 3.50 CASE P TIEB1 14:00 - 16:30 2.50 CASE P TlEB1 Start: 3/4/2006 Rig Release: 3/18/2006 Rig Number: 7ES Spud Date: 5/30/1994 End: 3/18/2006 dog sub taking 5 turns, Close Hydril and test 7-5/8" casing to 3500 psi for 10 minutes to verify sliding sleeve closed on Tam Port collar. Bleed off pressure. 'Circulate 120 degree 9.2 ppg brine through Tam combo tool at 126 gpm 130 psi. Continue to circulate 120 degree 9.2 ppg brine through Tam combo tool at 126 gpm 130 psi. Fluid temperature going down the hole at 120 degrees and coming out of the hole at 117 degrees, Brine weight in 9.2 ppg, Out 9,2 ppg. Little Red Hot Oil used to heat brine up to 120 degrees, Pull out of the hole. Lay down Tam combo tool. Clear floor of tools, Lay down 6-1/2" drill collars frorn the derrick. PU cleanout BHA #9 w/cleanout mill, reverse circulating finger basket, two boot baskets, RIH wlcleanout assembly, rotate slowly through TAM port collar. Stop at 3429'. Close hydril and test to 3500 psi. to check TAM port collar. Bleed down pressure to 0 psi and BD top drive. RIH to 4385' and drill pipe began to U-tube, RU top drive and circulate bottoms up w/returns indicating cement contamination, 301 gpm, 1476 psi. RIH and continue washing down without rotation f/4358' to 5818',168 gpm, 500 psi. CBU at 5818'.294 gpm, 1540 psi. Cement contaminated brine noted at bottoms up, PH increase to 12.0 RIH to 5830' and tag up on sand. Wash down 15' to 5845'. 294 gpm, 1550 psi, 15 rpm, 4.5K tq, Pump HI-Vis sweep and circulate until hole clean. Brine wt, = 9,2 ppg. Up wt. = 125K, SO wt = 95K, Rot. wt, = 11 OK. Monitor well, static, Blowdown topdrive. POH to BHA. Stand back HWDP, drill collars, and LD reverse circulating jet basket, boot baskets and jars. Service top drive and draw works, Function test BOP, RU Schlumberger wireline for USIT of cement job in 7-5/8" x 10-3/4" annulus above TAM port collar at 3353'. PJSM prior to job w/all hands, Schlumberger, WSL, and tourpusher. USIT tools would not test at surface. Check components and run backup equipment. RIH to 3500' w/USIT tools, USIT log f/3500' to surface, POH wlUSIT logging tools. RD Schlumberger logging unit. Publish and evaluate logs and consult w/town team to further evaluate USIT logs, MU HES EL retrievable bridge plug retrieving equipment. RIH to 5845' and tag sand w/retrieving tool. (Note: Pressured casing briefly to 3500 psi to confirm that port collar had not opened when passing through TAM collar w/bridge plug retrieving equipment.) Reverse circulate sand from HES EL retrievable bridge plug Printed: 3/20/2006 12: 11 :09 PM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P2-18 P2-18 WORKOVER NABORS ALASKA DRILLING I NABORS 7ES Start: 3/4/2006 Rig Release: 3/18/2006 Rig Number: 7ES Spud Date: 5/30/1994 End: 3/18/2006 3/15/2006 14:00 - 16:30 2,50 CASE P TIEB1 f/5845' to 5872'. 5 bpm, 775 psi. Go over retrieving neck on bridge plug and note pressure increase to 850 psi. Pump hi-vis sweep at same rates and pressures and circulate until brine is clean and no sand coming across shakers. Release retrievable bridge plug, Monitor well--static, 16:30 - 18:00 1,50 CASE P TIEB1 Pressure test 7-5/8" casing against Fast Drill bridge plug at 12746' in 4.5" tail pipe below the 7-5/8" packer to surface. Hold 3500 psi and chart for 30 minutes. Straight line chart. 18:00 - 20:30 2,50 CASE P TIEB1 POH and LD HES EL retrievable bridge plug, 20:30 - 21 :30 1,00 CLEAN P CLEAN RU and prepare to run cleanout BHA # 10, 21 :30 - 22:30 1,00 CLEAN P CLEAN PU and RI H w/BHA # 10 consisting of 6.75" x 4.5" mill shoe w/6' washpipe extension to wash down over tubing stub with internal4,75" dress mill for top of tubing, washover boot basket, two 4.75" junk baskets, bumper sub, oil jars, drill collars and HWDP, 22:30 - 00:00 1,50 CLEAN P CLEAN RIH wlcleanout BHA # 10 to 3431'. 3/16/2006 00:00 - 03:00 3.00 CLEAN P CLEAN RIH w/cleanout BHA # 10 f/3431 , to 12716', 03:00 - 03:30 0.50 CLEAN P CLEAN Wash down over tubing stub 6' f/12716' to 12721' w/4.5" ID mill shoe and washpipe, 165 gpm, 500 psi. Increase rate on bottom to 450 gpm, 3250 psi. PU slowly and see pressure drop to 3025' when coming off stub at 12716', PU to 12714' and circulate bottoms up. Small amount of sand and debris across shakers. 03:30 - 04:30 1,00 CLEAN P CLEAN Circulate clean 9.2 ppg completion brine to well surface to surface. Blow down topdrive. 04:30 - 12:00 7,50 CLEAN P CLEAN POH laying down drill pipe, 12:00 - 16:00 4,00 CLEAN P CLEAN LD heavy weight drill pipe and drill collars, 16:00 - 17:30 1,50 CLEAN P CLEAN LD Baker cleanout BHA # 10, Brine wt, = 9,2 ppg. 17:30 - 18:00 0,50 WHSUR P RUNCMP Pull wear bushing. 18:00 - 19:30 1,50 RUNCO RUNCMP RU compensator and torque turn equipment to run V AM TOP 13Cr tubing and completion, Make dummy run w/tubing hanger, 19:30 - 20:00 0,50 RUNCMP PJSM to run 13Cr completion string wIBOT, rig crew, torque turn hands, and BP WSL. 20:00 - 00:00 4.00 RUNCMP RIH to 2300' w/4.5" 13Cr completion, Baker-Lok tailpipe and packer assy, 3/17/2006 00:00 - 02:00 2,00 RUNCMP RIH w/4,5" 13Cr VAM Top completion to TAM Port Collar at 3353', Did not see indication of port collar when running through it w/tail pipe/packer assembly. 02:00 - 11 :00 9.00 RUNCMP RIH to 9500" wlcompletion assembly, 11:00 -12:00 1,00 RUNCMP RU subsurface safety valve control line spooler. 12:00 - 13:30 1,50 RUNCMP RIH w/4,5" completion tubing to 10512'. 13:30 - 14:00 0,50 RUNCMP RU control lines to subsurface safety valve, 14:00 - 19:30 5,50 RUNCMP Continue RIH w/4,5" completion tubing to 12723', Set down 6K to see the indicating pins in the Unique overshot shear, Tag bottom at 12727'. . Note: 56 stainless steel bands utilized for control lines, 19:30 - 22:00 RUNCMP Hook up control lines to tubing hanger and test. Use three pups under top joint of tubing to space out Unique overshot at 12725' and land tubing hanger, 22:00 - 22:30 0,50 RUNCMP RU to reverse circulate corrosion inhibited brine to annulus, 22:30 - 00:00 1,50 RUNCMP Reverse circulate corrosion inhibited brine to annulus, Pump 340 bbls at 900 psi indicating that Unique overshot is down Printed: 3/20/2006 12: 11 :09 PM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P2-18 P2-18 WORKOVER NABORS ALASKA DRILLING I NABORS 7ES Start: 3/4/2006 Rig Release: 3/18/2006 Rig Number: 7ES Spud Date: 5/30/1994 End: 3/18/2006 03:00 - 03:30 03:30 - 04:30 04:30 - 08:00 I 0,50 RUNCO 1.00 RUNCO 3,50 WHSUR P over tubing stub, Drop roller equipped ball and rod down tubing, Pressure up to 2800 psi to set Baker S-3 production packer. Continue to pressure up to 3500 psi and record 30 min. tubing test on chart. Bleed tubing from 3500 psi to 1500 psi and shut in, Pressure 4-1/2· x 7-5/8" annulus to 3500 psi and record 30 min. annulus test on chart. RUNCMP Bleed annulus pressure to 0 psi then bleed tubing pressure to 0 psi. Pressured annulus to 2400 psi and the DCK valve in GLM # 6 sheared out. Pumped 2 bbls seawater each way throuh valve to confirm shear out of DCK. RUNCMP Install TWC in tubing hanger. Test to 1000 from below, RUNCMP Nipple down BOP, RUNCMP Nipple up 135/8" x 4 1/16" adapter flange and 41/16" tree. Test pack-off and tree to 5000 psi. RUNCMP Rig up Drill Site Maintainence (DSM) lubricator and pull TWC. RUNCMP Rig up lines to freeze protect. Rig up Little Red hot oil unit and test lines to 3000 psi. Pump 85 bbl 80 deg F diesel down 4 1/2" x 7 5/8" IA. Allow diesel to 'U' tube. RUNCMP Rig up DSM lubricator and install BPV. Test with Little Red unit to 1000 psi from below, Rig down hot oil unit. RUNCMP Secure well, blow down lines, empty and clean pits, Rig released at 15:00 hrs, 02:00 - 03:00 08:00 - 09:00 09:00 - 12:00 1.00 WHSUR P 3.00 WHSUR P 12:00 - 13:00 1,00 WHSUR P 13:00 - 15:00 2,00 WHSUR P Printed: 3/20/2006 12:11:09 PM TREE = CrN P2-1'Actual Completion s. NOTES: OA CMT DOWN SQZ - 23 BBLS WEL:U1EAD = FMC "'·'_~~."""'="''''==,^"""rl A SET CMT 2650' - 3225' INTERVAL ON ACTUATOR = BAKER C KB. ELEV = 46.3' 06/07/98. BF, ELEV - nRI G DRAFT ***CHROME TBG*** KOP- 868' Max Angle = 54 @ 5997' I 2199' 1-14-1/2" HXOSSSV, ID=3.813" I Datum MD = 12728' . Datum TVD- 8800' SS , , I 7-5/8" CSG, 29.7#, Vam Top, L-80, ID = 6,8751 3357' ~ ~ GAS LIFT MANDRELS CEMENTED TO SURFACE ST MD TVD DEV TYÆ VLV LATCH PORT DATE 1 12171 8507 52 KBG-2 Dmy BK I 10-3/4" CSG, 45.5#, L-80, ID = 9.953" I 4323' r 2 11194 7904 52 KBG-2 Dmy BK 3 10199 7288 51 KBG-2 Dmy BK ~ 4 9247 6694 51 KBG-2 Dmy BK 5 8304 6110 52 KBG-2 Dmy BK 6 6312 4902 53 KBG-2 DCK BK Minimum ID = 3.725" @ 12772' 7 OTIS XN NIPPLE I 7-5/8" CSG, 29.7#, NT-95-LHE, ID = 6.875" I 12276' ~ , I . 12610' H 4-1/2"HESXNIP,ID=3.813" I ~ 0:-::; I 12672' 7-5/8" X 4-1/2" BAKER S-3 PKR, ID = ~ I 12695' H 4-1/2" HES X NIP, ID = 3.813" I ) 12725' H UNIQUE MACHINE OVERSHOT I I 14-1/2" TBG, 12,6#, 13-CR, .0152 bpf, ID = 3.958" I 12712' I t8: ....., I 12722' H7-5/8" x 4-1/2" BAKERSABL-3 PKR, ID = 3.983" I ...... I I 12756' H 4-1/2" OTIS X NIP, ID = 3.813" I . I I 12772' H 4-1/2" OTIS XN NIP, ID = 3,725" I ÆRFORA TION SUMMARY REF LOG: SPY rv1WD RESIS/GR ON 06/13/94 H 4-1/2" TUBING TAIL WLEG, ID = 4.00" I ANGLE AT TOP ÆRF: 51 @ 12906' I 12804' Note: Refer to Production DB for historical perf data I 12815' H ELMD TT LOGGED 07/25/94 I SIZE SPF INTERV AL Opn/Sqz DATE 3-3/8" 6 12906 - 13086 0 07/25/94 I PBTD I 13237' I I 17-5/8" CSG, 29.7#, 13-CR. ID = 6.875" I 13318' I DATE REV BY COMMENTS DATE REV BY COMMENTS POINT MCINTY RE UNIT 06/17/94 ORIGINAL COM PLETION 10/09/05 RA-IITLH WAWER SFlY NOTE DELETED WELL: P2-18 09/17/01 RNlTP CORRECTIONS ÆRMIT No: "1940600 09/20/02 DTRlKK GL V C/O API No: 50-029-22471-00 09/29/02 BIVVTP WAWER SAFETY NOTE SEC 14, T12N, R14E, 3590.65' FEL & 3709.06' FNL 03/23/03 JMP/KK WAWER SAFETY NOTE REV. 09/19/03 JRClTLP SAFETY NOTE CORRECTION BP Exploration (Alaska) ) ) FRANK H. MURKOWSKI, GOVERNOR ALASKA OIL AND GAS CONSERVAnONCO~SSION 333 W. 7TH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Dave Wesley Senior Drilling Engineer BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay, P2-18 Sundry Number: 306-026 loG /0 \C\V< Dear Mr. Wesley: 5t;ANNED JJ\N 2\ 5 2005 Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, gg~ Daniel T. Seamount Commissioner rj -~ DATED thisc3 day of January, 2006 Encl. ) STATE OF ALASKA ) ALASKA OIL AND GAS CONSERVATION COMMISSION JAN 2 0 2006 APPLICATION FOR SUNDRY APPROV Aluaska Oil & Gas Cons Comm' . . ISSIOI 20 AAC 25.280 Anchorage ~4A- ./ ~ . .:L~¡'" rt =l"t:IVED 1. Type of Request: 0 Abandon 0 Suspend 0 Operation Shutdown 0 Perforate 0 Other III Alter Casing III Repair Well 0 Plug Perforations 0 Stimulate 0 Re-Enter Suspended Well o Change Approved Program III Pull Tubing 0 Perforate New Pool 0 Waiver 0 Time Extension 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 4. Current Well C~s: 181 Development 0 Exploratory o Stratigraphic 0 Service 5. Permit To Drill Number 194-060 /' 6. API Number: 50- 029-22471-00-00 / 99519-6612 46.72' 9. Well Name and Number: PBU P2-18 /" 8. Property Designation: ADL 365548 10. Field / Pool(s): Prudhoe Bay Field / Point Mcintyre Pool PRESENT WELL CONDITION SUMMARY Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): 13237 / 9162 None MD TVD Burst Junk (measured): None Collapse 1.1. Total Depth MD (ft): 13335 Casing Structural Conductor Surface Intermediate Production Liner Total Depth TVD (ft): 9222 Length Size 80' 4290' 20" 10-3/4" 110' 4324' 110' 3708' 1490 5210 470 2480 13287' 7-5/8" 13318' 9212' 6890 4790 Perforation Depth MD (ft)~ Perforation Depth TVD (ft): 12906' - 13086' ./ 8956' - 9068' Packers and SSSV Type: 7-5/8" x 4-1/2" Baker 'SABL-3' packer; 4-1/2" Cameo TRCF-4A-SSA' SSSV Tubing Size: 4-1/2", 12.6# Tubing Grade: Tubing MD (ft): 13Cr 12804' Packers and SSSV MD (ft): 12722'; ~ 2201' 12. Attachments: 181 Description Summary of Proposal o Detailed Operations Program 14. Estimated Date for Commencing Operations: o BOP Sketch 13. Well Class after proposed work: / o Exploratory 181 Development 0 Service 16. Verbal Approval: Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed N~~e. ..' ve We~I,( , Title Senior Drilling Engineer Signature / 6l~ ~¿¿~7 ~ Phone 564-5153 Date/lzo;G& .I '--' Commission Use Only February 20, 2006 / Date: 15. Well Status after proposed work: 181 Oil 0 Gas o WAG DGINJ o Plugged DWINJ o Abandoned o WDSPL Contact Brandon Peltier, 564-5912 Prepared By Name/Number: Terrie Hubble, 564-4628 Conditions of approval: Notify Commission so that a representative may witness o Plug Integrity ~OP Test 0 Mechanical Integrity Test 0 Location Clearance I Sundry Number: 2Q(p-O;J..(Q Other: T~ t ß 0 e E to ~ S'oO ¡lC../. Subsequent Form Required: t 0 - 4-0 4- · Approved By: Form 10-403 Revised 07/2005 ~~ ORIGINAL COMMISSIONER APPROVED BY THE COMMISSION Date ¡þa!oh Submit In Duplicate ') ) Well Status: P2-18 is a comer well producer in the northern EOR/water flood area at Point McIntyre. The well has a confirmed leak through the 7-5/8" production casing. The well has been ..r shut-in. Project: P2-18 is currently completed conventionally with 4-1/2" 13 Cr tubing inside 7-5/8" 13 Cr production casing. The tubing will be cut and pulled above the existing packer. A USIT log will be run to evaluate the condition of the production casing across the Cretaceous interval and to determine where the casing should be cut above the down squeeze in the outer annulus. A packer will be run to that depth to confirm pressure integrity of the production casing below that point. Production casing will be cut and pulled. The stub will be fished and new premium threaded casing will be rerun and cemented to surface. New tubing will be run in the hole and stacked over the existing packer with an overshot. The new 13 Cr tubing string will be pressure tested in addition to the inner annulus. The plug will be removed from the well bore and the well will be placed on production and tested. Pre-RWO 1. Check well head seals and lock down screws. 2. Drift tubing. 3. Set plug in tubing tail just below packer. 4. Chemical cut 4-1/2" tubing above packer. 5. Circulate well clean and freeze protect with diesel. 6. Set BPV in tubing hanger 7. Remove well houses and flow lines. Prepare pad for rig. /" RWO 1. MIRU work over rig. Install TWC and test. ND tree and tubing head adapter flange. 2. NU B2~ and test per BP and AOGCC regulations. Test the BOPE to 250 psi low and p50 psi high. Test the annular to 250 psi low and 3500 psi high. Pull the TWC witM . ricator 3. PU landing joint or spear and make-up into the tubing hanger. Pull and lay down the tubing hanger. 4. Pull and lay down the 4-Y2", 12.6 lblft, 13-Cr tubing down to the cut @ -12670 ft md. 5. RU Schlumberger E-line and run USIT. The USIT log with be used to evaluate the condition of the production casing across the Cretaceous interval and to determine /' where the casing should be cut above the down squeeze in the outer annulus. 6. Run RTTS on DP to depth determined from USIT log. Test plug and casing below damage to 3500 psi for 30 minutes. 7. Set and test RBP -600' below TOC in OA. 8. Mechanical cut 7-5/8", 29.7 lblft, NT-95 casing below damage section. Circulate out OA freeze protection with brine. 9. Spear 7-5/8" casing. POOH casing to cut. / / ') ) 10. RIH wI back-off tool and back-off 7-5/8" casing stub at nearest collar. 11. Run new 7-5/8", 29.7 lblft, L-80, TC-II casing (length TBD). 12. Install 7-5/8" emergency slips and primary pack-off. Land slips and NU stack.~· 13. Cement new 7-5/8" casing back to surface with and Arctic slurry (volume TBD). 14. Lift stack and cut 7-5/8" with Wachs cutt~r. Install new tubing spool and second pack-off. Test new spools and BOP's. /,,- 15. Rlli with clean-out mill to ES cementer and drill cement. Pressure test 7-5/8" casing to 3500 psi for 30 minutes. POOH. " 16. Fish RBP. /' 17. PU wash shoe and 7-5/8" casing scraper on DP and Rlli to the tubing stub. Reverse circulate hole clean wI brine. 18. Rlli with DP and drill out tubing tail plug. 19. Run 4-Yz", 12.6 #/ft, 13 Chrome Yam Top tubing and overshot. Locate new tubing onto existing tubing stub. ,..-'" 20. Set the packer. Test the tubing and IA to 3500 psi for 30 minutes. 21. ND BOPE and NU adapter flange and tree. Test to 5000 psi. FP IA to -2200'. 22. RDMO. Post-RWO 1. Pull ball and rod from RHC sleeve. 2. Set gas lift valves. 3. Pull RHC sleeve. 4. Install SCSSSV. 5. Tie-in flow lines, replace well houses, and instrumentation. TREE = CfoN ~ WELLHEAD == FMC ÃëiÜÃTOR'; -... 'BAKÊRC "Kï3~'a:EV';;"46j¡' 'SF:.....ELEV' = '" ..... ., ',".'" ',',",W,n"",,,.,, 'kop';;'; 868' 'Ma¡'Ärl'gle";"' ... t:54'''@'''S'9S7'' Öatliïîïrv1Ö";;,;..'····· m,," """12i2'i~ï ..."...................................""...,... .""""'.............,.,..........,,........ Datum 1VD == 8800' SS ) 10-3/4" CSG, 45.5#, L-80, ID == 9.953" 1-1 4323' Minimum ID = 3.725" @ 12772' OTIS XN NIPPLE P2-18 - ~ L 7-5/8" CSG, 29.7#, NT-95-LHE, ID == 6.875" 1-1 12276' P 14-112" TBG, 12.6#, 13-CR, .0152 bpf, ID == 3.958" 1-1 12804' 1 ÆRFORA TION SUMMARY REF LOG: SPY MWD RESIS/GR ON 06/13/94 ANGLE AT TOP PERF: 51 @ 12906' Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DA TE 3-3/8" 6 12906 - 13086 0 07/25/94 I PBTD 1-1 13237' 17-5/8" CSG, 29.7#, 13-CR. ID == 6.875" 1-1 13318' /V 8: :&---1 I t J ~ ~ ~. S/\y NOTES: OA CMT DOWN SQZ - 23 BBlS AK".lc SET CMT 26S0' - 322S'INTERVAL ON 06/07/98. ***CHROME T8G"** 2201' 1- 4-1/2" CAMCO TRCF-4A-SSA SSSV, ID == 3.812" ~ GAS LIFT MANDRaS DEV ìYÆ VL V LA TCH 53 TMPDX DOME BK-2 54 TMPDX SO BK-2 51 TMPDX DMY BK-2 52 TMPDX DMY BK-2 52 TMPDX DMY BK-2 52 TMPDX DMY BK-2 52 TMPDX DMY BK-2 ST MD 1VD 1 4809 4005 2 7354 5530 3 8635 6313 4 9812 7051 5 10690 7597 6 11520 8106 7 12636 8790 PORT DATE 16 03/26/98 24 09/20/02 o o o o o 12700' 1"'4-1/2" OTIS X NIP, ID = 3.813" 1 12722' 1"'7-5/8" X 4-1/2" BAKER SABL-3 PKR, ID = 3.983" 12756' 1-1 4-1/2" OTIS X NIP, ID = 3.813" 1 12772' I.., 4-1/2" OTIS XN NIP, ID == 3.725" 1 12804' 1-1 4-1/2" TUBING TAIL WLEG, ID == 4.00" 1 12815' 1-1 ELMD IT LOGGED 07/25/94 1 DATE REV BY COMMENTS 10/09/05 RPI-VTlH WAIVER SFTY NOTE DELETED 11/06/05 JPKlTLH GL V CORRECTION DATE 06/17/94 09/17/01 09/20/02 09/29/02 03/23/03 09/19/03 REV BY COMMENTS ORIGINAL COM PLETION RNfTP CORRECTIONS DTR/KK GL V C/O BMlTP WAIVER SAFETY NOTE JMP/KK WA IVER SAFETY NOTE REV. JRClTLP SAFElY NOTE CORRECTION POINT MCINTYRE UNIT WELL: P2-18 ÆRMIT No: '1940600 API No: 50-029-22471-00 SEC 14, T12N, R14E, 3590.65' FEL & 3709.06' FNL BP Exploration (Alas ka) TREE = CrN .. ~_~"~_~g,~. FMC ACTUATOR = '''''''sÅKefc ï<ä~"EiEV"';"'" ···,····""...···'··"46:3; "ë'î=:"'E[ê.i "';.... ,. """...'·nw'. ,w ·'i<oP';"'..·, 868' ··Ma~jÙ,.gie"';.....·······54·"@59á?ï 'Öatùñï·'M5';"'''·~'-'''''·'''···'''·''·1'2'i2äì 'Datum iVÖ;"'''''' àaoÖïsS' 7-5/B" CSG, 29.7#, TC-I~ L-BO, ID=6.B75" H 2600 ~( CEMENTED TO SURFACE 10-314" CSG, 45.5#, L-BO.ID = 9.953" H - 4323' P2-18 . )oposed Completion SA\y NOTES: OA CMT DOWN SQZ - 23 BBlS AA...c SET CMT 2650' - 3225' INTERVAL ON 06/07/98. ***CHROME TBG"** (f) I -2200 1- 4-1/2" HXO SSSV, ID = 3.813" , ~ GAS LIFT MANDRELS ST MD lVD DEV TYÆ VLV LATCH PORT DATE 1 2 3 4 5 6 7 L Minimum ID = 3.725" @ 12772' OTIS XN NIPPLE 7-5/8" CSG, 29.7#, NT-95-LHE, ID = 6.875" 1-1 122761 P , ~ i I 1-1 4-1/2" HES X NIP, ID = 3.813" 1 :8: :8 I -12570 1-17-5/8" X 4-1/2" BAKER S-3 PKR, ID = ~ ~ I 1-1 4-1/2" HES X NIP, ID = 3.813" I -12670 1-1 UNIQUE MACHINE OVERSHOT ('" 14-1/2" TBG, 12.6#, 13·CR, .0152 bpf, 10 = 3.958" 1-1 12804' I I 127001 1-14-1/2" OTIS X NIP, 10 = 3.813" 1 8: &---1 127221 1-17-5/8" X 4-1/2" BAKERSABL-3 PKR, 10= 3.983"1 PERFORA TION SUMMARY REF LOG: SPY MllVO RESIS/GR ON 06/13/94 ANGLE AT TOP PERF: 51 @ 12906' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 12906 - 13086 0 07/25/94 t J 127561 1-1 4-1/2" OTIS X NIP, 10 = 3.813" 1 127721 1-1 4-1/2" OTIS XN NIP, 10 = 3.725"1 128041 1-1 4-1/2" TUBING TAIL WLEG, ID = 4.00" 1 128151 1-1 ELMO IT LOGGED 07/25/941 I PBTD 1-1 132371 ~ 17-5/8" CSG, 29.7#, 13-CR, 10 = 6.875" 1-1 13318' DATE 06/17/94 09/17/01 09/20/02 09/29/02 03/23/03 09/19/03 REV BY COMMENTS ORIGINAL COM PLETION RN/TP CORRECTIONS DTRlKK GL V C/O BM'TP WANER SAFElY NOTE JMP/KK WAN ER SAFElY NOTE REV. JROTLP SAFElY NOTE CORRECTION OA TE REV BY COMMENTS 10/09/05 RPH'TLH WAIVER SFTY NOTE DELETED POINT MCINTYRE UNIT WELL: P2-18 PERMIT No: '1940600 API No: 50-029-22471-00 SEC 14, T12N, R14E, 3590.65' FEL & 3709.06' FNL BP Exploration (Alaska) ¿ # (STATE OF ALASKA ( ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Abandon 0 SuspendD Operation Shutdown 0 Perforate 0 WaiverD OtherD Alter CasingD Repair Well[&] Plug PerforationsO Stimulate D Time ExtensionO Change Approved ProgramD Pull TubingD Perforate New Pool 0 Re-enter Suspended Well 0 2. Operator 4. Current Well Class: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc. 194-0600 Development Œ] Exploratory D 3. Address: P.O. Box 196612 6. API Number Anchorage, Ak 99519-6612 Stratigraphic 0 ServiceD 50-029-22471-00-00 7. KB Elevation (ft): 9. Well Name and Number: 46.72 P2-18 8. Property Designation: 10. Field/Pool(s): ADL-365548 Pt Mcintyre Oil Field / Pt Mcintyre Oil Pool 11. Present Well Condition Summary: Total Depth measured 13335 feet true vertical 9222.0 feet Plugs (measured) None Effective Depth measured 13237 feet Junk (measured) None true vertical 9161.7 feet Casing Length Size MD TVD Burst Collapse Conductor 80 20" 91.5# H-40 33 - 113 33.0 - 113.0 1490 470 Production 12245 7-5/8" 29.7 NT-95LHE 31 - 12276 31.0 - 8568.8 8180 5120 Production 1042 7-5/8" 29.7# 13CR80 12276 - 13318 8568.8 - 9211.5 6890 4790 Surface 4290 10-3/4" 45.5# L-80 34 - 4324 34.0 - 3708.1 5210 2480 Perforation decth: Measured depth: 12906 - 13086 True vertical depth: 8956.15 - 9068.44 Tubing (size, grade, and measured depth): 4-1/2" 12.6# 13Cr80 @ 28 - 12805 Packers & SSSV (type & measured depth): 4-1/2" Baker SABL-3 Packer @ 12722 4-1/2" TRCF-4A SSV @ 2201 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13 Recresentative Dailv Averaae Production or Iniection Data Oil-Bbl Gas-Met Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 862 0.58 4840 2300 749 Subsequent to operation: 827 0.5 3902 2000 808 14. Attachments: 15. Well Class after proposed work: ExploratoryD DevelopmentOO ServiceD Copies of Logs and Surveys run - 16. Well Status after proposed work: Operational Shutdown D OilŒ] GasD WAG D GINJD WINJD WDSPLD Daily Report of Well Operations. X Prepared by Garry Catron (907) 564-4657. 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Garry Catron NI A Printed Name ~arr Catron Title Production Technical Assistant Signature C Phone 564-4657 Date 1/21/04 ~~I\IED r-m ~ 3 2004 -- ar~ fEB \) (. 2 Form 1 0-404 Revised 12/2003 ( ( P2-18 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 09/14/03 TIO = 1200/2300/2300. MITOA Passed to 2500 psi during OA Gel/Diesel Load. Pump 10 bbls gelled diesel w/6 ppa of 100 mesh sand and 7 bbls gelled diesel with bentonite and cell flakes. Flush with 5 bbls straight diesel. Pressure test load to 2500 psi. Passed. FLUIDS PUMPED BBLS 10 7 5 3 1.5 2000 2026.5 Page 1 ( ( TREE = CIW SAFETY NOTES: OA CMT DOWN SOl - 23 BBLS W8..LHEAD = FMC P 2 1 8 ARCTIC SET CMT 2650' - 3225' INTERVAL ON ACTUð.TOR = BAKER C - 06/07/98. *** IA x OACOMM. OPERATING KB. ELEV = 46.3' PRESSUREOFTHE 10-3/4" ANNULUS MUST NOT BF. ELEV = EXCEED 2500 PSI (09/28/02) *** KOP = 868' Max Ange = 54 @ 5997' 4-112" CA Mea TRCF-4A-SSA Datum MD = 12728' IA Datum TVD = 8800' SS ., SSSV, D = 3.812" GAS LIFT MANDRELS 10-3/4" CSG, 45.5#, L-80, ID = 9.953" ST MD lV D DBI TYPE VL V LA Ta-I R)Rf DATE 1 4809 4005 53 TMPDX DMY BK-2 0 2 7354 5530 54 TMPDX SO BK-2 24 09/20/02 Minimum ID = 3.725" @ 12772' 3 8635 6313 51 TMPDX DMY BK-2 0 OTIS XN NIPPLE 4 9812 7051 52 TMPDX DMY BK-2 0 5 10690 7597 52 TMPDX DMY BK-2 0 6 11520 8106 52 TMPDX DMY BK-2 0 7 12636 8790 52 TMPDX DMY BK-2 0 7-5/8" CSG, 29.7#, NT-95-LHE, ID = 6.875" 4-112" OTIS X NIP, D = 3.813" 12722' -i 7-5/8" X 4-1/2" BA KER SABL-3 A<R, ID = 3.983" I 12756' -1 4-1/2" 011S X NIP, ID= 3.813" I -1 4-1/2" 011S XN NIP, ID = 3.725" I 4-1/2"TBG, 12.6#, 13-CR, 0.0152 bpf,ID=3.958" 12804' -i 4-1/2"TU3INGTAILWLEG,ID=4.00" I I 12815' 1-1 ELMD TT LOGGffi 07/25/94 I ÆRFORA TON SUMMARY RB= LOG: SPY MND RES IS/GR ON 06/13/94 ANGLE AT TOP PERF: 51 @ 12906' Note: Refer to Produetion DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 12906 - 13086 0 07/25/94 1 FBTD I 13237' 17-5/8" CSG, 29.7#, 13-CR, ID = 6.875" I 13318' DATE REV BY CO MM B\JTS DATE RBI BY COMMENTS FüINT IvICINTYRE UNIT 06/17/94 ORIGINAL COMPLETION WELL: P2-18 09/17/01 RN'TP CORRECTIONS PERMIT No: 1940600 09/20/02 DlRIKK GLV C/O AA No: 50-029-22471-00 09/29/02 BtvVTP WAIVERSAFEfY NOTE SEC14, T12N, R14E, 3590.65' F8.. &3709.06' FNL 03/23/03 JMP/KK WAIVERSAFEfY NOTE REV. 09/19/03 JROTLP SA FETY NOTE CORREC1l0N BP Exploration (Alas ka) STATE OF ALASKA ALASK/-?--"L AND GAS CONSERVATION COMMIS'?'N REPOR' OF SUNDRY WELL OPERATIC'NS · Operations performed: Operation shutdown __ Stimulate ~ Plugging __ Pull tubing __ Alter casing __ Repair well __ Per[orate Other __ 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 37' FNL, 4069' FEL, Sec. 14, T12N, R14E At top of production interval 1369' FSL, 1635' FWL, Sec. 1, T12N, R14E At effective depth At total depth 3709' FNL, 3590' FEL, Sec. 1, T12N, R14E 5. Type of Well: Development Exploratory Stratigraphic Service Datum elevation (DF or KB) KB 46.3 feet 7. unit or Property name POINT MCINTYRE UNIT 8. Well number P2-18 9. Permit number/approval number 94-60 / 10. APl number 500292247100 11. Field/Pool Point Mclntyre 12. Present well condition summary , Total Depth: measurea: true vertical: Effective Depth: measured: true vertical: Casing Length Size Conductor 80' 20" Surface 4323' 10 Intermediate Liner 12276' 7 5/8" 13335 feet Plugs (measured) 9222 feet 13220 feet Junk (measured) 9151 feet Cemented 260 SX Arcticset 1278 sx CS III, 354 sx 'G', 250 sx CS II 502 sx Class G None. None. Measured depth True vedical depth 110' 110' 4323' 3707' 12276' 8569' Perforation depth: measured 12906-13086' true vertical 8909-9022' Tubing (size, grade, and measured depth) 4 1/2 in. 12.6# 13CR @ 0-12804' MD, Packers and SSSV (type and measured depth) 4 X 6 7/8 PKR @ 12722' MD, 3 4/5 x 4 1/2 TRSSSV @ 2201' MD RECEIVED , UL 22 .... 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure Please refer to attached. Prior to well operation Subsequent to operation Representative Daily Avera.qe Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure 3211 2313 4220 3362 2388 4372 15. Attachments 116. Status of well classification as: Copies of Logs and Surveys run __ I Daily Report of Well Operations_~ Oil ~ Gas __ Suspended 17. I hereby ce~i~at the f_0J'egoing is true and correct to the best of my knowledge. S igned~_~...~ ',.,,"'~¢,~"~ ~ Title '£/v~, A/f,..C...F__. Date Tubing Pressure 806 784 Service Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE P2-18 DESCRIPTION OF WORK COMPLETED OUTER ANNULUS CEMENT DOWNSQUEEZE Date Event Summary 06-07-1998 Performed an Outer Annulus Cement Downsqueeze. MIRU. Well pressure tested to 2500 psi, then the fluids were pumped in the following stages: a) 5 bbls Fresh Water, followed by b) 23 bbls 15.7 ppg Arctic Set Cement w/1/4# sx Cellophane Flakes, followed by c) 100 bbls Crude, followed by d) 2 bbls Diesel, followed by e) Shutdown. Estimated cement top at 2650' MD, cement bottom at 3225' MD. RDMO. Well: P2-18 TRSSSV-- NIP -- PKR -- NIP -- NIP -- Per'[ -- GPMA WEB Date: 4/13/99 Well Type: PROD Orig Compltn: 6/17/94 Last W/O: Ref Log Date: 6/13/94 Angle @ TS: deg @ Angle @ TD: 52 deg @ 13335 Rev Reason: Last Update: 10/17/98 APl: 500292247100 SSSV Type: CAT I - SSSV Annular Fluid: LIFT GAS Reference SPY MWD Log: Resis/GR Last Tag: 1335 TD: 13318 ftKB Last Tag Date: Max Hole 54 deg @ 5997 Angle: Safe~N°tes Date Note 6/17/94 Minimum ID: 3.725" OTIS XN NIPPLE @ 12772' MD General NOteS:: Date Note 6/17/94 Well Status: ACTIVE 6/17/94 Tubing Hanger: FMC @ 28' MD Last Tag Depth @ 1335 Top Of Fluid Depth @ 12892 Other(plugs, equiP., etc.) - JEWELRY Depth TVD Type Description 2201 2128 TRSSSV 4-1/2" CAMCO TRCF-4A-SSA SSSV, ID=3.812" 12700 8829 NIP 4-1/2" OTIS X NIPPLE, ID=3.813" 12722 8842 PKR 7-5/8" x 4-1/2" BAKER SABL-3 PACKER 12756 8863 NIP 4-1/2" OTIS X NIPPLE, ID=3.813" 12772 8873 NIP 4-1/2" OTIS XN NIPPLE, ID=3.725" 12804 8893 TT WLEG 12815' ELMD ID 3.812 3.813 3.983 3.813 3.725 4.000 casing :Strings, All Size Weight Grade Top Btm Feet Description 10.750 45.50 L-80 0 4323 4323 SUR. CASING 7.625 29.70 NT95LHE 0 12276 12276 PROD. CASING 7.625 29.70 13CR 12276 13318 1042 PROD. CASING Tubing Strings- All Size Weight Grade Top Btm Feet Description 4.500 12.60 13CR 0 12804 12804 TUBING Gas Lift:Mandrels/Valves Stn MD TVD Man Man VMfr VType Mfr Type 1 4809 4005 OTIS TMPDX CA BK 2 7354 5530 OTIS TMPD× CA BKO 3 8635 6313 OTIS TMPDX OT DM-14R 4 9812 7051 OTiS TMPDX OT DM-14R 5 10690 7597 OTIS TMPDX OT DM-14R 6 11520 8107 OTIS TMPDX OT DM-14R 7 12636 8790 OTIS TMPDX OT DM-14R V OD Latch Port TRO Date Vlv Run Comment 1.0 BK-2 0.250 2505 3/26/98 GLM 1.0 BK-2 0.375 0 3/26/98 GLM 1.0 BK-2 0.000 0 6/17/94 GLM 1.0 BK-2 0.000 0 6/17/94 GLM 1.0 BK-2 0.000 0 6/17/94 GLM 1.0 BK-2 0.000 0 6/17/94 GLM 1.0 BK-2 0.000 0 6/17/94 GLM perforati°ns Summary Interval TVD Zone Status FeetSPF Date Type 12906 - 8956 - 9069 180 6 7/25/94 13086 Comment AOGCC liad'¥v'i'duai We'i'i :eo'i ogi:ca J Mater")' a I s PERh!IT DATA T DATA ..... PLUS RUI",.! DATE .... RECVD 96--060 ~;RESS/TEIqP L 12860 .... 1~070 I 0 9/2 9/; ga. ga .... 060 ~--ff~-"ERF L. 12550--1316~4- 9z~-060 ~S9~,~48 D 0,00--1-3-'355 GCT 9a-'---'060 ~I. JRVE\." R 0,00--~1~.'355 G,ST 94~'~060 ~DN/'CD/'CNP L 12720'~13280 9~-060 ~3 D 1333a.---. 127a. 0 CDN 1 09 / 29 / 9 a · 1 '12 /06 ,/9 -fl. 'l 2 / 06 / 9 a I 'i 1/!~0/9~ 1 i/' 3 0/" 91~ Ar'e cir'y ci~' tch samp i es r'equi' red"? yes l~____~8~-eece'i' ve(:t"?~~o Was the we'i'l cor'~d~ yes ysi:s & des(.'.r'~:p'.;~or~ ~-~ue"i'ved"/ Are we'i 'i tests r'eclu~' r'ed? yes ~e-'¥-~d? yes ~lo We i i i' s ,C,3MMENTS i'n cornp'i~'ance Date: Subject: From: To.' ARCO Alaska Inc. ', Greater Point McIntyre Engineering January 12, 1996 Transmittal Number ARCO Alaska, Inc. Bob Crandall AOGCC 3001 Porcupine Drive Anchorage, AK 99501 755 The following Greater Point McIntyre Area data are enclosed. This information is confidential and your cooperation in maintaining confidentiality is appreciated: Well Name Data Description Run # Date Run Company P2-18 FINAL LOG: GCT w/report I 6-26-94 Schlumberger Please sign one copy ~/~_~~and return to: GPMA Engr Aide, ATO-462 ARCO Alaska, Inc. P.O. Box 100360 Anchorage, Alaska 99510-0360 Transmittal Number: 755 Page: I Well Data Description FINAL DISKETTE: CDN with LIS Verification Listing (.TIF) ~ e> ~ ~ FINAL LOG: CDN LWD/Depth Corrected -Name P -18 FINAL DISKETTE: GCT w/Sub-Surface ~ Directional Survey ~ 9) t.~-(5/ Diskette: CDR/CDN w/LIS Verification '... .-. Please sig~ .. ::: and return to: Run # Date Run 4-26-94 Company Schlumberger 4-26-94 Schlumberger 3-26-94 Schlumberger 6-26-94 Schlumberger GPMA Engr Aide, ATO-462 ARCO Alaska, Inc. P.O. Box 100360 Anchorage, Alaska 99510-0360 Transmittal Number: 741 Page: 2 ARCO Alaska Inc. ~ Greater Point McIntyre Engineering Well Name Data Description Run # ~Leak Detection Log, 1 /~PIN/TEMP/PRESS/GRADIO L3-01 Tubing Puncher ( 1 n/~6,, Tubing 1 Puncher) Record >n Record (3 3/8" HSD - 4lB HJ II 6 splc) :~ (CBTE/SGTL/CALY) 1 ement Bond Log Diskette: CDR in LDWG format ,4~,~ 1 c N?_~r_(k3~erforation Record (3 3/8 HSD ~~F) ~., forating Record (3 3/8"-20'- 6spf) ,,.jj.~Perforating Record (3 3/8" HSD - 4lB HTII) 1  'CDN in LDWG format (w/listing) 1 ~~~~CI2)N~LWD Depth Corrected) 1  "Diskette': 5 Pass Cased Hole TDTP (w/listing) I Date: November 23, 1994 Subject: Transmittal Number 749 From: ARCO Alaska, Inc. To' Bob Crandall '~%~),.~ 3001 Porcupine Drive .,4o?o~ Anchorage, AK 99501 '~'~; ~,~. The following Greater Point McIntyre Area data are enclosed. Thl~nformation and your cooperation in maintaining confidentiality is appreciated: Date Run 9/25/94 9/25/94 10/8/94 10/8/94 6/16/94 ~q 9//9/94 10/9/94 11/2/94 6/13/94 6/14/94 1/9/94 is confidential Company Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Transmittal Number: 749 Page: 1 ARCO Alaska Inc. Greater Point McIntyre Engineering Date: November 23, 1994 Subject: Transmittal Number 749 From: ARCO Alaska, Inc. To' Bob Crandall A~CC 3001 Porcup~e Drive ~chorage, ~ 99501 % ~e follow~g Greater Point Mc~tyre Area data are enclosed. Thi~formation and your cooperation in ma~ta~g confidentiality is appreciated: .~- Well -' ~ Name Data Description Run # i /-'v'Z370T~Leak Detection Log. 1 ' .'/\ ~.-O'?~_~SPIN/TEMP/PRESS / GRADIO . L3-01 Tubing Puncher Record ( I n/ .. Tubing 1 Puncher) erforati~L3-01 )n Record (3 ~/s" HSD - 4lB ~ II 6 spf) 1 7"~ement Bond Log (CBTE/SGTL/CALY) 1 Diskette: CDR in LDWG format /~,^ 1 · ?_:0.3_ erforation Record (3 HSD "~~3 Perforat~g Record (3 ~/8" -20' - 6sp~ -~x~ 1 ";~ ~P-03 ~~erfora~g Record (3 ~A HSD- ~IB  CDN ~ LDWG fo~at (w/listing) 1 ~N~L~ Dep th Corrected) 1 ~ Diskette: 5 Pass Cased Hole ~~ (w/lis~g) Date Run 9/25/94 9/25/94 10/8'/94 10/8/94 6/16/94 9//9/94 10/9/94 11/2/94 6/13/94 6/14/94 1/9/94 is confidential Company Schlumberger - Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Transmittal Number: 749 Page: 1 Date: Subject: From: To' ARCO Alaska Inc. ;~' Greater Point McIntyre Engineering September 29, 1994 Transmittal Number ARCO Alaska, Inc. 745 Bob Crandall AOGCC 3001 Porcupine Drive Anchorage, AK 99501 The following Greater Point McIntyre Area data are enclosed. and your cooperation in maintaining confidentiality is appreciated: Well Name Data Description Run # L3-O1 ....Tubing Puncher Record ~q' 1 ~ ~ 2-~Bit and Ring Resistivity ~ ~DR-Final L.~6'~' C~R-Very Enhanced Resistivity-Gamma Ray '~2~, 7~rue Vertical Depth CDR-Final .~4--14 Injection Profile Log (Press-Temp-SPIN-GR) 1 ~z21 Injection Profile Log (Press-Temp-SPIN-GR) P~06 Perforation Record 23/8" Phased E~ 6 SPF 1 ~-07 . Perfora~g Record wi~ GR/CCL Jewe~ Log 1 ~ Perfor~pon Record 3-3/8" HSD 41B ~ 6 SPF / g R ora ¢ /CCL ~2-18 . Static pressure Survey-Press-Temp ~2-21 Perfora~on Record 3-3/8" HSD 41B ~ 6 SPF 1 Tr~s~al N~ber: 745 Page: Date Run Company 9/6/94 Schlumberger 1-12 3/6/94 Schlumberger 1-12 3/19/94 Schlumberger 1-12 3/19/94 Schlumberger 1-12 3/19/94 Schlumberger 8/23/94 8/23/94 7/27/94 7/27/94 7/21/94 7/25/94 7/25/94 7/22/94 Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger STATE OF ALASKA ' ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMP LETION REPORT .AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] :2. Name of Operator 7'. Permit Number ARCO Alaska, inc. 94-60 3. Address 8. APl Number P. 0. Box 196612, Anchorage, Alaska 99519-6612 50- 029-22471 4. Location of well at surface I COMPLETi0~ i-- -~'~ ..... =~ 9. Unit or Lease Name Point Mclntyre 39'SNL, 1212'EWL, SEC. 14, T12N, R14E~/MPATE ~ [~i'" ";i 10. Well Number At Top Producing Interval 1254'NSL, 1529'EWL, SEC. 1, T12N, R14E~ !_'.. and Pool At Total Deplh Point Mclntyre 1526' NSL, 1745' EWL, SEC. 1, T12N, R14E 5. Elevation in feet (indicate KB, DF, etc.) ~6. Lease Designation and Serial No. KBE -- 46. 72' ! ADL 365548 12. Date Spudded5/30/94 13. Date T.D. Reachedc/13/94 14' Date C°mp" Susp' °r Aband' 115' Water Depth' if °ffsh°re 116' N°' °f C°mplati°ns7/25/94 N/A feet MSL One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD)19. Directional Survey I0. Depth where SSSV set Il. Thickness of Permalros t 13335' MD/9221' TVD 13237' MD/9162' TVD YES [] NO [] 2201' feet MD 1750' (Approx.) 22. Type Electric or Other Logs Run GR/NEU/DEN/RES/I_ WD 23. CASING, LINER AND CEMENTING RECORD SETTING DEP'rH MD CASING SIZE WT. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 30' 110' 30" 260 sx Arcticset (Approx.) 10-3/4" 45.5# L-80 34' 4324' 13-1/2" 1278 sx CS 111/354 sx "G" 7-5/8" 29. 7# 13CR/NT95LHE 31' 13318' 9-7/8" 502 SX Class "G" 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) Gun Diameter3-3~8" 6 spf 4-1/2", 13CR80 12805' 12722' MD TVD (ss) 12906'-13086' 8909'-9019' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) 7/28/94 I FIowing Date of Test Hours Tested PROOUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO TEST PERIOD Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24.-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. AUG - 5 1994 Alaska 0il & Gas Cons. Commission Anch0ra~, Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE ~9. 30. , GEOL~ MAF~ERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Subsea West Sak 9709' 6941' Kuparuk 12893' 8902' OWC 13168' 9073' RECEIVED AU6 - 5 1994 Aias.ka 0il & Gas Cons. Commission 31. LIST OF ATTACHMENTS Ancl~0ra~e 32. I hereby certify that/the foregoing is true and correct to the best of my knowledge // Signed ~~'~~ Title OrillingEngineerSuloervisor Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: P2-18 BOROUGH: NORTH SLOPE UNIT: POINT MCINTYRE FIELD: POINT MCINTYRE LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 05/30/94 02:00 SPUD: 05/30/94 11:00 RELEASE: OPERATION: DRAG RIG: DOYON 14 WO/C RIG: DOYON 14 05/30/94 ( 1) TD: 110' ( 110) 05/31/94 ( 2) TD: 1350'(1240) 06/01/94 ( 3) TD: 3878' (2528) 06/02/94 (4) TD: 4345'( 467) 06/03/94 (5) TD: 4613' ( 268) 06/04/94 (6) TD: 6677' (2064) SLIP/CUT DL MW: 0.0 VIS: 0 TURN KEY WELL TO WELL MOVE. NU 20" DVRTR SYST. TAKE ON WATER IN PITS, MIX SPUD MUD. SLIP & CUT DL 59.5' BUILD BERMS F/CUTTINGS PIT & USE 60 X 60 HERCULITE UNDER THE RIG. DRILLING MW: 8.9 VIS:160 MIX SPUD MUD. PU BHA #1. FUNCTION TEST DVRTR SYSTM. PRESPUD SFTY MTG. FILL DVRTR SYST, CHK F/LEAKS, OK. C/O ICE F/CONDUCTOR 40 T/Il0'. DRAG T/304, KO PT. LOST CIRC/PACKED OFF F/Il0 T/2000. LOST 500 BBLS FLUID. CIRC/CLEAN HOLE. POOH PU KO BHA #2. PU MWD & MOTOR & RIH. DRILL T/1350. DRILLING MW: 9.4 VIS:100 CON'T DIRCT'L DRAG T/1930. REAM OUT DOG LEG F/1837 T/1930. DRLG T/2702. CBU. WIPER TRIP F/2702 T/1080. OK. DRILL F/2702 T/3600. CBU. WIPER TRIP F/3600 T/2700. OK. DRAG T/3878. CMT'NG 10.75" CASG. MW: 9.5 VIS: 85 DRLG T/4345. CBU. WIPER TRIP T/1080. CIRC/COND MUD. DROP SURVEY & POOH, RETRIEVE SURVEY. LD BHA & DOWN LOAD MWD. RU & RUN 110 JTS 10.75, 45.5#, L-80 BUTT CASG. & LAND. CBU. CMT CASG. DRILLING MW: 9.2 VIS: 35 COMP CMT'NG 10.75 & COMP TOP JOB. ND DIVERTER SYST. & NU BOPE. C/O 13-5/8" 5000# ANNUL. PREVENTERS. TEST BOPE. SET WEAR BUSHING PU & MU BHA RIH TAG FAT COLA @4237. DRILL FC & CMT T/4307. CIRC OUT CMT & THICK MUD. TEST CASG T/3000/30 MIN. DRILL REMAINDER OF CMT, SHOE & 10' OF NEW HOLE. LOT 12.#. DRLG & SURV F/4353 T/4613. DRILLING MW: 9.3 VIS: 69 DRLG F/4613 T/5127. CBU. WIPER TRIP T/SHOE SERVICE RIG. DRLG T/5994. CBU. 10 STND WIPER TRIP WORK THRU 3 STNDS OFF BTTM. DRLG F/5994 T/6677. RECEIVED AUG' -5 1994 ALaska Oil & (]as Cons. Commission Anchora~,~: WELL : P2-18 OPERATION: RIG : DOYON 14 PAGE: 2 06/05/94 (7) TD: 7565' ( 888) 06/06/94 (8) TD: 9012' (1447) 06/07/94 (9) TD: 9832' ( 820) 06/08/94 (10) TD: 9832' ( 0) 06/09/94 (11) TD:10518'( 686) 06/10/94 (12) TD:l1417' ( 899) 06/11/94 (13) TD:12788' (1371) WASH & REAM T/BTTM MW: 9.3 VIS: 65 DRLG F/6678 T/6895 CBU POOH CUT DL RIH DRLG F/6895 T/7565. CBU DROP SURV & POOH. CHANGE BITS & DOWNLOAD MWD RIH HIT BRIDGE @7100. WASH & REAM T/BTTM. DRILLING MW: 9.4 VIS: 77 WASH & REAM F/7100 T/7565. DRLG & SURV. F/7565 T/8517. CBU. WIPER TRIP T/7072. DRLG F/8517 T/9012. POOH F/NEW BIT MW: 9.5 VIS: 70 DRILG & SURV. F/9012 T/9512. CBU. WIPER TRIP T/8500. DRLG & SURV T/9832. CBU. POOH F/NEW BIT. FISH F/CONE PIECES MW: 9.7 VIS: 73 STAND BACK BHA MU TRI STATE REVERSE CIRC. BSKT. RIH T/SHOE. CUT 200' DL. RIH CIRC, DROP BALL & FISH F/CONE & CUT 2' CORE. POOH W/REV. BSKT. BREAK DOWN FISHING TOOLS & RECOVER 25% OF CONE. CLEAN OUT BOOT BASKET. DRESS REV. BSKT W/NEW FINGERS & HEAD. SERV. RIG. HOLD SFTY MTG. RIH W/FISHING TOOLS. CIRC & DROP BALL & FISH F/CONE PIECES. DRILLING MW: 9.7 VIS: 66 CON'T POOH W/REV. CIRC JUNK BSKT. RECOVER 25% OF CONE & FORMATION CORE. LD FISHING TOOLS. MU BHA #5 BIT, MOTOR, SS MWD-LWD. RIH FILL PIPE @ 7180. MAD PASS F/9575 T/9837. WASH 60' T/BTTM. DRILG 9-7/8" HOLE T/10518. REPAIR SWIVEL MW: 9.7 VIS: 67 CON'T DRLG 9-7/8" HOLE T/10829. CBU. SHORT TRIP T/9762. HOLE OK. DRLG T/11417. FOUND SWIVEL LEAK. SHORT TRIP T/10475. OK. REPAIR ON SWIVEL- FOUND "O" RING GROOVE WASHED OUT IN GOOSE NECK WASH PIPE ADPTR FLNG. CHANGE OUT. DRILLING MW: 9.8 VIS: 62 CON'T T/REPAIR SWIVEL WASH PIPE ADPTR FLNG. DRLG 9-7/8 HOLE F/11417 T/12416. CIRC HOLE CLEAN. 11 STND SHORT RIP F/12416 T/11343. OK. CON'T DRLG F/12416 T/12788. RECEIVED AUG - 5 ]994 A~ska Oil & Gas Cons. Commission Anchoraj~ WELL : P2-18 OPERATION: RIG : DOYON 14 PAGE: 3 06/12/94 (14) TD:12944' ( 156) 06/13/94 (15) TD:13244' ( 300) 06/14/94 (16) TD:13335' ( 91) 06/15/94 (17) TD:13335' ( 0) 06/16/94 (18) TD:13335' ( 0) 06/17/94 (19) TD:13335' ( 0) RIH W/BIT #5 MW: 9.6 VIS: 40 CON'T DRLG T/12944. CBU. 6 STND SHORT TRIP OK. CBU. C/O MUD SYSTM. T/KCL. ATTEMPT T/DRILL, COULDN'T GET DIFFERENTIAL W/DYNA DRILL ON BTTM. PUMP DRY JOB & POOH, LD MOTOR, PULL WEAR RING, TEST BOP & MANIFOLD T/500/5000. RERUN WEAR RING. MU BHA #5 & RIH T/4300. SLIP & CUT DL 59.5'. CON'T RIH W/BIT #5. DRILLING MW:10.1 VIS: 65 CON'T RIH T/12869. CONTAMINATED MUD CAUSED EXCESSIVE DRAG GOING DOWN. CBU. WASH & REAM F/12869 T/12914. COND. MUD MADE CONNECTION REAM T/BTTM @12944. DRILLING F/12944 T/13244. MAD PASS W/ANADRILL CDN MW:10.3 VIS: 90 CON'T DRLG F/13244 T/13335 TD. CBU. SHORT TRIP 10 STNDS, OK. CIRC HOLE CLEAN. PUMP DRY JOB. POOH LD 17 JTS F/MUD PASS. CAN'T UNLOAD DATA F/SS MWD-LWD, WILL RETRIEVE @ SHOP. MU BHA #7 W/ANADRILL CND COLLAR, RIH FILL PIPE @8230, 11454 & 12806. MAKE MAD PASS F/12806 T/13150. RUN 7-5/8 CSG MW:10.1 VIS: 75 CON'T RUNNING LWD-CDN LOG T/13335. CBU. POOH LD DP & BHA RETRIEVE CND LOG. CHANGE TOP RAMS T/7-5/8 29.7# 13CR NSCC CASG & 50 JTS 7-5/8" 29.7# HT95HS NSCC CASG, RAN 75 OF 323 JTS. RUNNING 4.5" TBG MW: 8.6 VIS: 0 FINISH RUNNING 323 JTS OF 7-5/8" 29.7# NSCC L-80 & 13CR CASG. LAND CASG & CIRC @ 10 BPM, BATCH MIX CMT. MIX & PUMP SPACERS & CMT. BUMP PLUG. TEST CASG T/3500/30 MIN. LD CMT HEAD & LNDG JT. RD FLOOR. INSTALL PACKOFF & TEST T/5000. CHANGE RAMS T/VARIABLES & TEST DOORS. SLIP & CUT DL. RU & RUN 4.5" 13CR NSCT 12.6# TBG. SETTING PACKER MW: 8.6 VIS: 0 FINISH RUNNING 324 JTS 4.5" 13CR TBG & LAND SAME. ND BOPE & NU TREE. TEST TREE ASSY T/5000. OK. RU LUBR. & PULL 2-WAY CHECK VALVE. DSPLC SEAWATER W/253 BBLS DIESEL DOWN TBG. DROP BALL & PREPARE T/SET PKR. RECEIVED AUO - 5 1994 Alaska Oil & Gas Cons. Commission Anchor~j,~- WELL : P2-18 OPERATION: RIG : DOYON 14 PAGE: 4 06/18/94 (20) TD: 13335 PB: 9223 RIG RELEASED MW: 8.6 Seawater ATTEMPT T/SET PKR. WOULDN'T PRESS UP. RU OTIS WL. RIH W/BELL GUIDE & RETRIEVE TOOL. RET. BALL- WORN FLAT ON ONE SIDE, RIH W/RHC PLUG WOULD NOT SET. LOST PLUG ON POOH. MU PULLING TOOL & RIH. COULDN'T RET. RHC PLUG. RD OTIS. RU DSM LUBR. & SET BPV & RD OTIS. RU DSM LUBR. & SET BPV/RD DSM. PUMP CELLAR SECURE WELL & RELEASE RIG @22:00 HRS. ON 6/17/94. SIGNATURE: (dril~ superintendent ) DATE: RECEIVED AUG -5 i994 Alaska Oil & Gas Cons, Commission Anchor~j~ SPA~-~{Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PT. McINTYRE/P2-18 500292247100 NORTH SLOPE COMPUTATION DATE: 6/15/94 DATE OF SURVEY: 061394 MWD SURVEY JOB NUMBER: AK-MM-940520 KELLY BUSHING ELEV. = 46.30 FT. OPERATOR: ARCO ALASKA TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 0 .00 -46.30 307 307.39 261.09 400 400.52 354.22 492 492.64 446.34 583 582.77 536.47 0 0 N .00 E .00 .00N .00E 0 38 N 49.13 E .21 1.12N 1.30E 2 11 N 55.82 E 1.67 2.46N 3.16E 3 38 N 46.87 E 1.64 5.46N 6.76E 5 15 N 43.34 E 1.82 10.43N ll.70E .00 1.70 3.93 8.53 15.52 671 670.55 624.25 761 759.87 713.57 851 848.48 802.18 942 938.20 891.90 1031 1024.76 978.46 7 14 N 40.64 E 2.27 17.60N 18.10E 8 30 N 40.98 E 1.40 26.94N 26.17E 10 0 N 40.58 E 1.67 37.87N 35.60E 11 6 N 41.64 E 1.23 50.46N 46.59E 13 5 N 44.80 E 2.36 63.95N 59.33E 25.13 37.48 51.91 68.62 87.15 1123 1114.20 1067.90 1216 1203.75 1157.45 1310 1292.57 1246.27 1402 1379.82 1333.52 1496 1468.68 1422.38 15 2 N 40.98 E 2.34 80.40N 74.53E 17 11 N 43.51 E 2.43 99.52N 91.95E 19 15 N 42.00 E 2.26 121.00N 111.78E 18 21 N 41.42 E .99 143.17N 131.55E 19 6 N 41.39 E .79 165.78N 151.48E 109.52 135.38 164.58 194.28 224.41 1590 1558.19 1511.89 1685 1647.81 1601.51 1778 1737.39 1691.09 1869 1823.33 1777.03 1960 1908.10 1861.80 18 23 N 40.05 E .87 188.80N 171.30E 17 28 N 41.04 E 1.04 210.84N 190.15E 17 25 N 38.69 E .75 232.45N 208.20E 20 42 N 38.49 E 3.60 255.67N 226.72E 21 59 N 38.83 E 1.42 281.53N 247.42E 254.79 283.80 311.95 341.64 374.75 2053 1992.79 1946.49 2145 2076.54 2030.24 2240 2161.39 2115.09 2332 2242.77 2196.47 2426 2325.04 2278.74 24 19 N 40.25 E 2.61 309.46N 270.50E 25 34 N 40.25 E 1.35 339.20N 295.68E 26 56 N 40.23 E 1.44 371.16N 322.72E 28 42 N 38.02 E 2.22 404..48N 349.79E 29 38 N 36.90 E 1.15 440.94N 377.72E 410.97 449.94 491.81 534.73 580.59 2519 2405.43 2359.13 2609 2482.36 2436.06 2700 2559.25 2512.95 2796 2638.32 2592.02 2890 2714.87 2668.57 31 28 N 38.31 E 2.11 478.52N 406.69E 31 46 N 38.95 E .50 515.52N 436.25E 32 55 N 43.04 E 2.72 552.23N 468.20E 34 39 N 40.10 E 2.50 591.81N 503.26E 36 5 N 41.21 E 1.68 633.03N 538.68E 627.99 675.33 723.99 776.86 831.21 2982 2788.75 2742.45 3074 2859.48 2813.18 3165 2927.70 2881.40 3260 2996.26 2949.96 3355 3064.99 3018.69 38 7 N 39.63 E 2.43 675.59N 574.90E 40 28 N 38.76 E 2.63 720.46N 611.47E 43 9 N 40.43 E 3.17 767.47N 650.38E 43 40 N 38.00 E 1.86 817.72N 691.38E 44 14 N 39.78 E 1.42 869.30N 732.99E 887.09 944.97 1005.98 1070.83 1137.07 RECEIVED AUG - 5 1994 Alaska Oil & Gas Cons. Commission Anchoraj~ SP.~.~RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PT. McINTYRE/P2-18 500292247100 NORTH SLOPE COMPUTATION DATE: 6/15/9 TRUE SUB-SEA COURS MEASD VERTICAL VERTICAL INCLN DEPTH DEPTH DEPTH DG MN 3539 3193.75 3147.45 3629 3254.84 3208.54 3725 3319.99 3273.69 3817 3381.18 3334.88 3911 3443.15 3396.85 DATE OF SURVEY: 061394 MWD SURVEY JOB NUMBER: AK-MM-940520 KELLY BUSHING ELEV. = 46.30 FT. OPERATOR: ARCO ALASKA COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST 46 52 N 39.38 E 1.44 970.48N 816.62E 47 12 N 40.45 E .95 1020.79N 858.71E 48 5 N 39.39 E 1.23 1075.61N 904.57E 48 1 N 37.88 E 1.23 1128.80N 947.09E 49 25 N 37.08 E 1.62 1184.85N 990.06E VERT. SECT. 1268.33 1333.92 1405.40 1473.47 1544.00 4004 3503.53 3457.23 4096 3562.11 3515.81 4183 3616.09 3569.79 4283 3677.08 3630.78 4341 3713.18 3666.88 49 35 N 36.83 E .27 1241.36N 1032.58E 51 36 N 37.87 E 2.36 1298.04N 1075.84E 52 2 N 37.83 E .50 1352.26N 1117.98E 52 0 N 37.28 E .44 1414.22N 1165.61E 51 16 N 37.58 E 1.32 1450.44N 1193.34E 1614.60 1685.81 1754.41 1832.47 1878.03 4433 3770.28 3723.98 4527 3827.38 3781.07 4621 3885.13 3838.83 4716 3942.95 3896.65 4808 3998.94 3952.64 52 10 N 37.87 E 1.00 1507.68N 1237.62E 52 43 N 37.81 E .59 1566.33N 1283.17E 52 2 N 37.94 E .73 1625.49N 1329.19E 52 41 N 37.55 E .76 1684.78N 1375.09E 52 30 N 37.72 E .24 1742.77N 1419.80E 1950.32 2024.51 2099.39 2174.29 2247.44 4901 4055.82 4009.52 4995 4112.63 4066.32 5088 4168.67 4122.37 5181 4224.57 4178.27 5275 4281.19 4234.89 52 12 N 40.10 E 2.05 1800.14N 1466.11E 53 1 N 38.00 E 1.99 1857.87N 1512.93E 53 0 N 38.18 E .16 1916.45N 1558.84E 52 56 N 38.99 E .70 1974.38N 1605.06E 53 15 N 38.13 E .80 2033.33N 1652.06E 2321.14 2395.45 2469.82 2543.90 2619.26 5368 4336.63 4290.33 5461 4391.96 4345.66 5554 4447.52 4401.22 5649 4503.99 4457.69 5743 4559.84 4513.54 53 25 N 36.36 E 1.54 2092.63N 1697.13E 53 28 N 37.92 E 1.35 2152.12N 1742.20E 53 31 N 36.48 E 1.24 2211.93N 1787.59E 53 24 N 35.16 E 1.12 2273.73N 1832.20E 53 30 N 35.66 E .44 2335.14N 1875.86E 2693.63 2768.15 2843.12 2919.10 2994.17 5834 4614.35 4568.05 5926 4668.71 4622.41 6020 4724.12 4677.82 6115 4780.30 4734.00 6208 4835.85 4789.55 53 25 N 35.33 E .30 2395.03N 1918.57E 53 45 N 35.99 E .68 2454.90N 1961.53E 53 40 N 38.22 E 1.92 2515.07N 2007.04E 53 47 N 38.20 E .14 2575.25N 2054.41E 53 27 N 36.19 E 1.77 2635.32N 2100.00E 3067.47 3140.91 3216.24 3292.77 3368.07 6301 4890.85 4844.55 6394 4946.10 4899.80 6489 5002.42 4956.13 6583 5058.47 5012.17 6677 5113.92 5067.62 53 59 N 37.46 E 1.24 2695.31N 2144.92E 53 20 N 38.79 E 1.34 2754.41N 2191.30E 53 25 N 38.08 E .61 2813.79N 2238.43E 53 46 N 39.23 E 1.04 2873.15N 2285.91E 53 51 N 38.98 E .24 2931.98N 2333.72E 3442.87 3517.94 3593.71 3669.68 3745.48 SP,,-cRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PT. McINTYRE/P2-18 500292247100 NORTH SLOPE COMPUTATION DATE: 6/15/94 DATE OF SURVEY: 061394 MWD SURVEY JOB NUMBER: AK-MM-940520 KELLY BUSHING ELEV. = 46.30 OPERATOR: ARCO ALASKA FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 6770 5168.93 5122.63 6864 5225.30 5179.00 6958 5282.23 5235.93 7051 5338.49 5292.19 7146 5396.46 5350..16 53 7 N 38.75 E .83 2989.84N 2380.35E 53 1 N 38.39 E .33 3048.47N 2427.11E 53 4 N 42.35 E 3.34 3106.08N 2476.09E 52 20 N 38.96 E 3.01 3162.09N 2524.21E 52 5 N 39.85 E .79 3219.87N 2571.67E 3819.77 3894.72 3970.34 4044.18 4118.95 7239 5453.56 5407.26 7333 5510.66 5464.36 7428 5568.29 5521.99 7501 5612.29 5565.99 7619 5683.18 5636.88 52 20 N 40.09 E .35 3276.33N 2618.99E 52 35 N 40.30 E .31 3333.11N 2666.97E 52 55 N 40.40 E .37 3390.89N 2716.06E 53 0 N 40.56 E .20 3435.25N 2753.92E 53 31 N 40.44 E .45 3507.49N 2815.62E 4192.61 4266.95 4342.76 4401.09 4496.08 7708 5735.91 5689.61 7799 5790.71 5744.41 7896 5850.31 5804.01 7990 5907.65 5861.35 8083 5965.20 5918.90 53 35 N 38.43 E 1.82 3562.64N 2860.98E 52 16 N 40.20 E 2.12 3618.77N 2906.93E 52 0 N 41.49 E 1.09 3676.76N 2957.06E 52 9 N 41.93 E .41 3731.71N 3006.04E 51 46 N 41.59 E .51 3786.59N 3055.04E 4567.48 4640.01 4716.67 4790.26 4863.81 8176 6023.02 5976.72 8268 6079.45 6033.15 8362 6137.29 6090.99 8454 6194.32 6148.02 8548 6252.67 6206.37 51 38 N 42.90 E 1.11 3840.80N 3104.27E 52 2 N 43.31 E .56 3893.22N 3153.33E 52 4 N 43.14 E .15 3947.28N 3204.14E 51 42 N 42.65 E .57 4000.54N 3253.62E 51 25 N 44.90 E 1.90 4053.63N 3304.49E 4936.99 5008.71 5082.79 5155.42 5228.82 8641 6310.40 6264.10 8733 6368.35 6322.05 8826 6425.98 6379.68 8920 6484.98 6438.69 9013 6543.54 6497.24 51 24 N 43.52 E 1.17 4105.50N 3354.94E 51 20 N 44.67 E .97 4157.58N 3405.41E 51 17 N 44.59 E .09 4208.82N 3455.99E 51 1 N 44.03 E .55 4261.26N 3507.18E 51 4 N 43.25 E .65 4313.67N 3557.16E 5301.01 5373.38 5445.18 5518.28 5590.58 9107 6602.75 6556.45 9200 6660.82 6614.52 9292 6718.50 6672.20 9385 6777.12 6730.82 9478 6835.07 6788.77 51 7 N 43.23 E .06 4367.12N 3607.42E 51 12 N 43.71 E .41 4419.46N 3657.04E 51 16 N 43.59 E .13 4471.43N 3706.62E 50 59 N 43.88 E .39 4523.98N 3756.90E 51 15 N 43.50 E .43 4575.94N 3806.54E 5663.86 5735.87 5807.58 5880.18 5951.92 9571 6893.54 6847.24 9664 6952.16 6905.86 9754 7008.63 6962.33 9847 7066.42 7020.12 9939 7123.68 7077.38 50 57 N 44.28 E .73 4628.17N 3856.77E 51 4 N 43.60 E .58 4680.31N 3907.02E 51 37 N 44.23 E .82 4731.16N 3955.99E 51 31 N 42.95 E 1.08 4783.93N 4006.22E 51 34 N 42.48 E .40 4836.92N 4055.14E 6024.24 6096.51 6166.97 6239.71 6311.77 SP}-.-={Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PT. McINTYRE/P2-18 500292247100 NORTH SLOPE COMPUTATION DATE: 6/15/94 TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN DATE OF SURVEY: 061394 MWD SURVEY JOB NLrMBER: AK-MM-940520 KELLY BUSHING ELEV. = 46.30 FT. OPERATOR: ARCO ALASKA COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 10035 7182.87 7136.57 10127 7240.40 7194.10 10221 7299.12 7252.82 10314 7357.03 7310.73 10409 7416.25 7369.95 51 35 N 41.96 E .43 4892.19N 4105.29E 51 28 N 43.47 E 1.28 4945.40N 4154.41E 51 25 N 43.18 E .25 4999.02N 4204.99E 51 22 N 43.62 E .37 5051.73N 4254.84E 51 14 N 43.10 E .45 5105.49N 4305.60E 6386.36 6458.71 6532.31 6604.76 6678.60 10502 7474.35 7428.05 10595 7532.55 7486.25 10687 7589.32 7543.02 10782 7648.11 7601.81 10875 7705.30 7659.00 51 13 N 42.85 E .21 5158.42N 4354.92E 51 41 N 42.46 E .60 5212.14N 4404.41E 51 49 N 42.16 E .29 5265.40N 4452.89E 51 43 N 42.13 E .10 5320.75N 4502.99E 52 15 N 42.72 E .76 5374.77N 4552.35E 6750.87 6823.86 6895.83 6970.45 7043.58 10968 7762.64 7716.34 11061 7819.34 7773.04 11154 7876.85 7830.55 11245 7933.07 7886.77 11337 7990.08 7943.78 52 14 N 42.64 E .07 5429.22N 4602.56E 52 7 N 42.83 E .21 5482.86N 4652.13E 51 56 N 42.30 E .49 5537.14N 4701.97E 51 49 N 42.47 E .19 5590.07N 4750.28E 51 43 N 41.84 E .55 5643.73N 4798.86E 7117.58 7190.55 7264.19 7335.80 7408.16 11432 8048.50 8002.20 11526 8106.47 8060.17 11619 8164.00 8117.70 11713 8222.57 8176.27 11802 8276.96 8230.67 51 48 N 41.27 E .48 5699.23N 4848.06E 51 49 N 40.95 E .27 5754.78N 4896.53E 51 47 N 40.84 E .10 5810.06N 4944.41E 51 47 N 41.69 E .71 5866.01N 4993.51E 52 15 N 41.55 E .54 5918.12N 5039.80E 7482.30 7556.02 7629.15 7703.58 7773.26 11899 8336.53 8290.23 11995 8395.13 8348.83 12091 8453.34 8407.04 12184 8510.27 8463.97 12276 8567.07 8520.77 52 19 N 41.42 E .13 5975.84N 5090.84E 52 21 N 40.47 E .78 6033.20N 5140.60E 52 23 N 39.60 E .72 6091.02N 5189.18E 52 13 N 39.91 E .31 6147.67N 5236.31E 52 6 N 40.37 E .41 6203.59N 5283.46E 7850.29 7926.23 8001.74 8075.44 8148.58 12368 8623.76 8577.46 12461 8680.83 8634.53 12555 8738.33 8692.03 12646 8794.66 8748.36 12733 8848.36 8802.06 52 1 N 40.89 E .46 6258.79N 5330.82E 52 1 N 40.00 E .76 6314.42N 5378.24E 52 4 N 41.13 E .95 6370.42N 5426.18E 51 52 N 40.19 E .84 6425.06N 5473.12E 51 55 N 39.90 E .27 6477.48N 5517.17E 8221.31 8294.41 8368.13 8440.16 8508.63 12834 8910.85 8864.55 12930 8970.49 8924.19 13021 9027.75 8981.45 13114 9085.84 9039.54 13200 9138.72 9092.42 51 34 N 40.01 E .35 6538.24N 5568.07E 51 5 N 39.72 E .56 6595.46N 5615.86E 51 22 N 38.98 E .70 6650.60N 5661.07E 51 32 N 37.59 E 1.18 6707.84N 5706.25E 52 5 N 37.90 E .69 6761.02N 5747.41E 8587.89 8662.44 8733.74 8806.61 8873.79 S~.__~RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 5 PRUDHOE BAY DRILLING PT. McINTYRE/P2-18 500292247100 NORTH SLOPE COMPUTATION DATE: 6/15/94 DATE OF SURVEY: 061394 MIND SURVEY JOB NUMBER: AK-MM-940520 KELLY BUSHING ELEV. = 46.30 FT. OPERATOR: ARCO ALASKA TRUE SUB-SEA COURS COURSE DLS TOTAL MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 13255 9172.66 9126.36 52 12 N 37.81 E .25 13335 9221.31 9175.01 52 12 N 37.81 E .00 6795.50N 5774.22E 8917.43 6845.07N 5812.68E 8980.10 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 8980.10 FEET AT NORTH 40 DEG. 20 MIN. EAST AT MD = 13335 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 40.34 DEG. SPideRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PRUDHOE BAY DRILLING PT. McINTYRE/P2-18 500292247100 NORTH SLOPE COMPUTATION DATE: 6/15/94 PAGE DATE OF SURVEY: 061394 JOB NUMBER: AK-MM-940520 KELLY BUSHING ELEV. = 46.30 FT. OPERATOR: ARCO ALASKA INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST 0 .00 -46.30 .00 N .00 E 1000 994.26 947.96 58.92 N 54.33 E 2000 1944.38 1898.08 292.95 N 256.60 E 3000 2802.39 2756.09 683.84 N 581.73 E 4000 3500.78 3454.48 1238.77 N 1030.64 E MD-TVD VERTICAL DIFFERENCE CORRECTION .0O 5.74 5.74 55.62 49.88 197.61 141.99 499.22 301.61 5000 4115.49 4069.19 1860.87 N 1515.27 E 6000 4712.21 4665.91 2502.35 N 1997.02 E 7000 5307.11 5260.81 3130.69 N 2497.94 E 8000 5913.74 5867.44 3737.54 N 3011.28 E 9000 6535.18 6488.88 4306.13 N 3550.07 E 884.51 385.29 1287.79 403.28 1692.89 405.09 2086.26 393.38 2464.82 378.56 10000 7161.09 7114.79 4871.77 N 4086.93 E 11000 7781.75 7735.45 5447.36 N 4619.27 E 12000 8397.78 8351.48 6035.82 N 5142.84 E 13000 9014.32 8968.02 6637.54 N 5650.50 E 13335 9221.31 9175.01 6845.07 N 5812.68 E 2838.91 374.09 3218.25 379.34 3602.22 383.97 3985.68 383.46 4113.69 128.01 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. S~.~RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PT. MCINTYRE/P2-18 500292247100 NORTH SLOPE COMPUTATION DATE: 6/15/94 DATE OF SURVEY: 061394 JOB NUMBER: AK-MM-940520 KELLY BUSHING ELEV. = 46.30 FT. OPERATOR: ARCO ALASKA INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 0 .00 -46.30 46 46.30 .00 146 146.30 100.00 246 246.30 200.00 346 346.30 300.00 .00 N .00 E .00 .00 N .00 E .00 .00 .01 N .02 E .00 .00 .68 N .78 E .01 .01 .43 N 1.67 E .01 .01 446 446.30 400.00 546 546.30 500.00 647 646.30 600.00 747 746.30 700.00 849 846.30 800.00 3.54 N 4.68 E .09 .07 7.99 N 9.39 E .30 .22 15.26 N 16.09 E .80 .50 25.41 N 24.84 E 1.70 .90 37.58 N 35.35 E 2.99 1.29 951 946.30 900.00 1053 1046.30 1000.00 1156 1146.30 1100.00 1261 1246.30 1200.00 1367 1346.30 1300.00 1472 1446.30 1400.00 1578 1546.30 1500.00 1683 1646.30 1600.00 1788 1746.30 1700.00 1894 1846.30 1800.00 51 67 86 109 134 .65 N 47.65 E .51 N 62.86 E .91 N 80.19 E .10 N 101.03 E .83 N 124.19 E 159.96 N 146.35 E 185.77 N 168.76 E 210.48 N 189.84 E 234.68 N 209.98 E 262.46 N 232.12 E 4.73 1.74 7.13 2.40 10.47 3.34 15.01 4.54 20.84 5.83 26.30 5.46 31.98 5.68 37.13 5.15 41.97 4.84 48.11 6.14 2002 1946.30 1900.00 2111 2046.30 2000.00 2223 2146.30 2100.00 2336 2246.30 2200.00 2450 2346.30 2300.00 293 328 365 406 450 .59 N 257.14 E .15 N 286.32 E .30 N 317.77 E .00 N 350.98 E .61 N 384.98 E 55.79 7.68 65.56 9.76 '76.78 11.22 89.76 12.98 104.42 14.66 2567 2446.30 2400.00 2685 2546.30 2500.00 2805 2646.30 2600.00 2928 2746.30 2700.00 3056 2846.30 2800.00 498.16 N 422.24 E 546.10 N 462.48 E 596.04 N 506.82 E 650.34 N 553.80 E 711.70 N 604.43 E 121.26 16.84 139.25 18.00 159.53 20.27 182.65 23.12 210.46 27.81 3191 2946.30 2900.00 3329 3046.30 3000.00 3470 3146.30 3100.00 3616 3246.30 3200.00 3765 3346.30 3300.00 780.74 N 661.69 E 855.31 N 721.34 E 932.05 N 785.00 E 1013.77 N 852.73 E 1098.29 N 923.14 E 244.81 34.35 283.10 38.28 324.32 41.22 370.15 45.83 418.83 48.68 SP,-~RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE PRUDHOE BAY DRILLING PT. McINTYRE/P2-18 500292247100 NORTH SLOPE COMPUTATION DATE: 6/15/94 INTERPOLATED VALUES FOR EVEN 100 DATE OF SURVEY: 061394 JOB NUMBER: AK-MM-940520 KELLY BUSHING ELEV. = 46.30 FT. OPERATOR: ARCO ALASKA FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH 3916 3446.30 3400.00 4071 3546.30 3500.00 4233 3646.30 3600.00 4394 3746.30 3700.00 4558 3846.30 3800.00 TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST 1187.78 N 992.27 E 1282.29 N 1063.60 E 1382.88 N 1141.71 E 1483.34 N 1218.70 E 1585.97 N 1298.41 E MD-TVD VERTICAL DIFFERENCE CORRECTION 469.80 50.97 524.79 54.99 586.72 61.93 648.03 61.31 712.00 63.97 4721 3946.30 3900.00 4886 4046.30 4000.00 5051 4146.30 4100.00 5217 4246.30 4200.00 5384 4346.30 4300.00 1688.27 N 1377.76 E 1790.76 N 1458.20 E 1893.10 N 1540.49 E 1996.75 N 1623.17 E 2103.12 N 1704.86 E 775.59 63.59 839.85 64.25 904.93 65.08 971.00 66.07 1038.32 67.32 5552 4446.30 4400.00 5720 4546.30 4500.00 5888 4646.30 4600.00 6057 4746.30 4700.00 6226 4846.30 4800.00 2210.61 N 1786.61 E 1106.36 68.04 2320.28 N 1865.19 E 1174.30 67.94 2430.18 N 1943.57 E 1242.30 68.00 2538.77 N 2025.70 E 1311.25 68.95 2646.70 N 2108.33 E 1380.02 68.77 6395 4946.30 4900.00 6563 5046.30 5000.00 6732 5146.30 5100.00 6898 5246.30 5200.00 7064 5346.30 5300.00 2754.62 N 2860.28 N 2966.29 N 3070.10 N 3169.96 N 2191.47 E 1449.02 69.00 2275.40 E 1516.98 67.96 2361.45 E 1586.22 69.24 2444.71 E 1652.69 66.46 2530.57 E 1718.06 65.38 7227 5446.30 5400.00 7391 5546.30 5500.00 7557 5646.30 5600.00 7726 5746.30 5700.00 7890 5846.30 5800.00 3269.13 N 3368.72 N 3469.55 N 3573.68 N 3672.92 N 2612.93 E 1781.22 63.15 2697.19 E 1845.59 64.37 2783.28 E 1911.65 66.07 2869.73 E 1979.95 68.29 2953.67 E 2043.96 64.02 8052 5946.30 5900.00 8214 6046.30 6000.00 8376 6146.30 6100.00 8538 6246.30 6200.00 8698 6346.30 6300.00 3768.65 N 3862.34 N 3955.71 N 4047.98 N 4137.97 N 3039.11 E 2106.64 62.68 3124.29 E 2168.00 61.36 3212.04 E 2230.54 62.54 3298.85 E 2291.95 61.41 3386.03 E 2352.26 60.31 8858 6446.30 6400.00 9017 6546.30 6500.00 9177 6646.30 6600.00 9336 6746.30 6700.00 9495 6846.30 6800.00 4226.88 N 4316.16 N 4406.40 N 4496.53 N 4586.10 N 3473.79 E 2412.28 60.03 3559.50 E 2471.40 59.11 3644.56 E 2530.71 59.31 3730.52 E 2590.43 59.72 3816.17 E 2649.67 59.24 SPAF~RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 9 PRUDHOE BAY DRILLING PT. McINTYRE/P2-18 500292247100 NORTH SLOPE COMPUTATION DATE: 6/15/94 DATE OF SURVEY: 061394 JOB NUMBER: AK-MM-940520 KELLY BUSHING ELEV. = 46.30 FT. OPERATOR: ARCO ALASKA INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE VERTICAL CORRECTION 9654 6946.30 6900.00 4675.06 N 3902.02 E 2708.69 9815 7046.30 7000.00 4765.39 N 3988.96 E 2769.06 9976 7146.30 7100.00 4857.95 N 4074440 E 2829.90 10137 7246.30 7200.00 4950.78 N 4159.52 E 2890.72 10297 7346.30 7300.00 5042.01 N 4245.57 E 2951.12 59.01 60.38 60.84 60.82 60.40 10457 7446.30 7400.00 5132.83 N 4331.17 E 3011.04 10617 7546.30 7500.00 5224.98 N 4416.16 E 3071.41 10779 7646.30 7600.00 5319.05 N 4501.44 E 3133.03 10942 7746.30 7700.00 5413.70 N 4588.27 E 3195.81 11105 7846.30 7800.00 5508.29 N 4675.66 E 3258.86 59.93 60.36 61.62 62.78 63.05 11267 7946.30 7900.00 5602.48 N 4761.64 E 3320.93 11428 8046.30 8000.00 5697.13 N 4846.21 E 3382.52 11590 8146.30 8100.00 5793.05 N 4929.71 E 3444.29 11752 8246.30 8200.00 5888.54 N 5013.57 E 3506.01 11915 8346.30 8300.00 5985.33 N 5099.21 E 3569.42 62.07 61.59 61.78 61.72 63.41 12079 8446.30 8400.00 6083.98 N 5183.36 E 3633.17 12242 8546.30 8500.00 6183.25 N 5266.17 E 3696.61 12405 8646.30 8600.00 6280.62 N 5349.70 E 3759.28 12568 8746.30 8700.00 6378.13 N 5432.91 E 3821.85 12730 8846.30 8800.00 6475.46 N 5515.48 E 3884.01 63.75 63.44 62.66 62.58 62.16 12891 8946.30 8900.00 6572.40 N 5596.69 E 3945.23 13051 9046.30 9000.00 6668.65 N 5675.67 E 4004.92 13212 9146.30 9100.00 6768.70 N 5753.39 E 4066.33 13335 9221.31 9175.01 6845.07 N 5812.68 E 4113.69 61.22 59.70 61.41 47.36 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS SUB- SURFACE DIRECTIONAL SURVEY ~-~ UIDANCE ~'10NTINUOUS J-~ OOL Company ARCO ALASKA, INC. Well Name P2-18 (39' SNL, 1212' EgL, SEC 14, TI~ 12N, RNG 14E) Field/Location POINT NCINTYRE, NORTH SLOPE, ALASKA Job Reference No. 94232 LoQqed By' Date 26-dUN-94 Computed By: NARNER KRUIdELL . SCHLUMBERGER · OCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR ARCO ALASKA, INC. P2- i8 POINT MCINTYRE NORTH SLOPE, ALASKA SURVEY DATE' 26-JUNE-g4 ENGINEER' D. WARNER METHODS OF COMPUTATION TOOL LOCATION- MINIMUM CURVATURE INTERPOLATION' LINEAR VERTICAL SECTION' HORZZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF NORTH 39 DEG 52 MIN EAST COMPUTATION DATE: 6-JUL-94 PAGE I ARCO ALASKA, INC. P2 - 18 Point MCINTYRE NORTH SLOPE, ALASKA DATE OF SURVEY' 26-JUNE-94 KFILY BUSHING EI_EVATION' 46.30 FT ENGINEER' D. WARNER INTERPOLATED V~LUES FOR EVEN 1OO FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOLFFH EAST/WEST DIST. AZIMUTH FEET DEG/100 FEET FEET FEET DEG 0 O0 100 O0 200 O0 300 O0 400 O0 500 O0 600 O0 700 O0 800 O0 900 O0 0 O0 100 O0 200 O0 300 O0 399 95 499 79 599 53 698 95 797 89 896 44 -46 30 53 70 153 70 253 70 353 65 453 553 652 751 85O 0 0 N 0 0 E 0 12 N 75 26 W 0 9 N 74 32 W 0 25 N 53 22 E 2 5O N 47 44 E 49 3 35 N 46 47 E 23 4 37 N 43 48 E 65 7 42 N 40 27 E 59 8 55 N 40 33 E 14 10 25 N 41 2 E 0 O0 -0 07 -0 21 0 O3 2 8O 8 42 15 55 26 21 40 71 57 64 0 O0 0 O0 0 O0 0 O1 0 O1 0 O1 0 02 0 O2 0 O2 0 01 0 O0 N 0 09 N 0 18 N 0 40 N 2 21 N 6 06 N 11 12 N 19 11 N 30 15 N 42 96 N 0.00 E 0.21W 0 0.54 W 0 0.42 W 0 1.73 E 2 5,88 E 8 10.95 E 15 18.00 E 26 27.40 E 40 38.48 E 57 0 O0 N 0 0 E 23 N 67 19 W 57 N 71 39 W 58 N 46 56 W 81 N 37 58 E 44 N 44 8 E 61 N 44 34 E 26 N 43 17 E 74 N 42 15 E 67 N 41 51E 1000 O0 1100 1200 1300 1400 1500 1600 1700 1800 1900 994 56 O0 1092 O0 1188 O0 1283 O0 1378 O0 1473 O0 1568 O0 1663 O0 1758 O0 1852 948 26 11 53 O1 1045 71 14 11 47 1142 17 16 20 87 1237 57 18 17 66 1332 36 18 40 39 1427 09 18 40 30 1522 O0 17 54 53 1617.23 17 45 70 1712.40 18 16 89 1806.59 21 0 N 41 47 E N 41 38 E N 42 27 E N 42 11E N 41 35 E N 41 0 E N 40 2 E N 40 9 E N 39 35 E N 39 3 E 76.91 99.32 125.63 155.57 187.40 219.42 250.93 281.43 312.15 345.70 0 O2 0 O3 0 03 0 01 0 O0 0 O0 0 01 0 O0 0 02 0 O2 57 42 N 74 93 115 139 163 187 210 234 26O 16 N 74 N 83 85 N 103 55 N 125 62 N 146 58 N 166 89 N 186 45 N 2O6 50 N 227 51.23 E 66 15 E 99 75 E 125 98 E 155 26 E 187 39 E 219 85 E 251 52 E 281 23 E 312 39 E 345 76 95 N 41 44 E 37 N 41 44 E 7O N 41 47 E 67 N 41 55 E 52 N 41 55 E 55 N 41 49 E 05 N 41 39 E 54 N 41 29 E 25 N 41 2O E 78 N 41' 7 E 2000 O0 1945 75 1899.45 22 39 2100 2200 2300 2400 2500 2600 2700 2800 2900 O0 2037 O0 2127 O0 2216 O0 2304 O0 2390 O0 2476 O0 2560 O0 2644 O0 2725 17 1990.87 24 59 40 2081.10 26 9 41 2170.11 27 58 18 2257.88 29 17 76 2344.46 30 52 17 2429.87 31 41 75 2514.45 32 53 O1 2597.71 34 31 60 2679.30 36 9 3000 O0 2805.36 2759.06 38 13 3100 3200 3300 3400 3500 3600 3700 3800 3900 O0 3440 O0 2882.60 2836 30 40 47 O0 2956.94 2910 O0 3029 59 2983 O0 3101 10 3054 O0 3171 33 3125 O0 3239 93 3193 O0 3307 63 3261 O0 3374 58 3328 78 3394 64 42 53 29 43 54 80 44 48 03 46 2 63 47 8 33 47 46 28 48 9 48 49 3 N 39 37 E N 39 49 E N 39 38 E N 38 30 E N 37 37 E N 37 44 E N 38 41 E N 40 23 E N 40 12 E N 40 12 E 382 78 423 29 466 41 511 97 559 86 609 86 661 83 715 19 770 56 828 36 Iq 38 59 E N 38 4 E 952 N 37 56 E 1018 N 37 48 E 1087 N 38 34 E 1157 N 38 58 E 1228 N 39 10 E 1301 N 39 15 E 1375 N 37 43 E 1449 N 37 9 E 1524 888 67 16 99 67 54 70 45 05 30 18 0 03 0 02 0 02 0 O2 0 O1 0 02 0 O1 0 O1 0 02 0 O1 0 02 0 02 0 O1 0 O1 0 O1 0 02 0 O1 0 02 00l 0 O1 289 19 N 250 88 E 382 85 N 40 57 E 320 353 388 426 466 507 548 590 634 36 N 276 48 N 304 84 N 333 59 N 362 27 N 393 15 N 425 26 N 459 43 N 495 61N 532 75 E 423 36 E 466 10 E 512 61E 559 10 E 609 23 E 661 24 E 715 13 E 77O 41E 828 35 N 4.0 49 E 46 N 40 44 E O1 N 40 35 E 88 N 40 22 E 86 N 40 8 E 83 N 39 59 E N 39 57 E 56 N 39 59 E 37 N 40 0 E 681 O0 Iq 570 94 E 888 67 N 39 59 E 730 783 837 892 948 1004 1061 1119 1179 76 N 610 45 N 651 74 N 693 74 N 736 18 N 781 75 N 827 58 N 874 84 N 920 44 N 965 41E 952 57 E 1018 71E 1087 85 E 1157 49 E 1228 25 E 1301 02 E 1375 08 E 1449 53 E 1524 16 N 39 52 E 99 N 39 45 E 68 N 39 38 E 56 N 39 32 E 73 N 39 30 E 48 N 39 28 E 08 N 39 28 E 35 N 39 24 E 25 N 39 18 E ARCO ALASKA, INC. P2 - I8 POINT MCINTYRE NORTH SLOPE, ALASKA COMPUTATION DATE' 6-JUL-94 PAGE 2 DATE OF SURVEY: 26-JUNE-94 KELLY BUSHING ELEVATION: 46.30 FT ENGINEER: D. WARNER INTERPOLATED VALUES FOR EVEN 1OO FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN 4000 O0 3505 85 $459 55 49 42 4100 4200 4300 4400 4500 4600 4700 48OO 4900 O0 3569 O0 3631 O0 3693 O0 3755 O0 3816 O0 3877 O0 3939 O0 3999 O0 4060 79 3523 74 3585 28 3646 27 3708 76 3770 72 3831 10 3892 85 3953 87 4014 49 51 13 44 51 50 98 52 8 97 51 55 46 52 21 42 52 6 80 52 30 55 52 41 57 52 11 5000 O0 4121 92 4075 62 52 49 5100 5200 5300 5400 5500 560O 5700 5800 5900 O0 4182 15 4135 O0 4242 51 4196 O0 4302 58 4256 O0 4362 34 4316 O0 4421 90 4375 O0 4481 36 4435 O0 4540 87 4494 O0 4600.43 4554 O0 4660.01 4613 85 52 57 21 52 58 28 53 10 04 53 22 6O 53 32 06 53 32 57 53 30 13 53 25 71 53 16 N 37 8 E 1600 03 N 37 26 E 1676 82 N 37 38 E 1755 26 N 37 41E 1834 02 N 37 38 E 1912 43 N 38 9 E 1991 25 N 38 28 E 2070 49 N 38 37 E 2149.42 N 38 50 E 2228.83 N 39 8 E 2308.05 N 38 13 E 2387 23 N 37 46 E 2467 N 37 39 E 2546 N 37 27 E 2626 N 37 7 E 2706 N 36 44 E 2786 N 36 10 E 2867 N 35 33 E 2947 N 35 14 E 3027 N 35 23 E 3107 02 68 57 67 9O 15 32 39 44 0 O1 0 02 0 O1 0 O1 0 O1 0 O1 0 O1 0 O1 0 O1 0 O0 0 O1 0 01 0 O1 0 O0 0 O0 0 O1 0 O0 0 01 0 O0 0 01 1239 98 N 1011 37 E 1600 13 N 39 12 E 1301 1363 1425 1487 1550 1612 1674 1736 1797 21N 1057 46 N 1105 81N 1153 94 N 1201 10 N 1250 36 N 1299 08 N 1348 03 N 1398 63 N 1448 87 E 1676 69 E 1755 90 E 1834 83 E 1912 36 E 1991 43 E 2070 66 E 2149 37 E 2229 19 E 2308 97 N 39 7 E 44 N 39 2 E 24 N 38 59 E 69 N 38 56 E 53 N 38 53 E 8O N 38 52 E 75 N 38 51E 18 N 38 51E 40 N 38 51E 1859 40 N 1497 76 E 2387 60 N 38 51E 1922 33 N 1546 1985 43 N 1595 2048 79 N 1644 2112 58 N 1692 2176 81N 1741 2241.49 N 1788 2306.61 N 1836 2372.16 N 1882 2437.81N 1928 87 E 2467 61E 2547 37 E 2627 94 E 2707 19 E 2787 94 E 2867 03 E 2948 46 E 3028 72 E 3108 42 N 38 49 E 13 N 38 47 E 07 N 38 45 E 22 N 38 42 E 51 N 38 39 E 85 N 38 36 E 13 N 38 31E 33 N 38 26 E 52 N 38.21E 6000 O0 4719.26 4672 96 53 58 6100 6200 6300 6400 6500 6600 6700 6800 6900 O0 4778 39 4732 O0 4837 O0 4896 O0 4955 O0 5015 O0 5074 O0 5133 O0 5193 O0 5253 53 4791 75 4850 78 4909 30 4969 68 5028 74 5087 32 5147 59 5207 09 53 46 23 53 34 45 53 S1 48 53 28 O0 53 28 38 53 39 44 53 55 02 52 58 29 53 5 N 35 47 E 3187 77 N 36 17 E 3268 26 N 35 59 E 3348 71 N 37 1 E 3429 14 N 37 49 E 3509 79 N 37 48 E 3590 09 N 38 59 E 3670 53 N 39 6 E 3751 22 N 39 3 E 3831 52 N 38 56 E 3911 31 0 O1 0 O1 0 O1 0 O1 0 O1 0 O0 0 O1 0 O0 0 O1 0 O1 2503 36 N 1975 55 E 3188 98 N 38 17 E 2568 2633 2698 2762 2826 2889 2951 3014 3076 37 N 2023 55 N 2070 44 N 2118 57 N 2167 O2 N 2216 18 N 2266 81N 2317 11N 2368 17 N 2418 27 E 3269 74 E 3350 51E 3430 54 E 3511 83 E 3591 70 E 3672 58 E 3752 26 E 3833 42 E 3913 58 N 38 14 E 16 N 38 11E 70 N 38 8 E 41 N 38 7 E 76 N 38 7 E 23 N 38 7 E 91 N 38 8 E 21 N 38 9 E O0 N 38 10 E 7000.00 5313 72 5267.42 53 2 7100.00 5374 58 5328.28 52 9 7200.00 5435 92 5389.62 52 16 7300.00 5496 99 5450.69 52 29 7400.00 5557 69 5511.39 52 54 7500.00 5617 99 5571.69 52 52 7600.00 5677 98 5631.68 53 26 7700,00 5737.42 5691.12 53 39 7800.00 5797.22 5750.92 52 21 7900.00 5858.42 5812.12 52 7 N 40 7 E 3991 21 N 39 16 E 4070 55 N 38 54 E 4149 N 38 48 E 4228 N 38 45 E 4308 N 39 29 E 4387 N 39 37 E 4467 N 39 29 E 4548 N 39 49 E 4628 N 40 52 E 4707 52 69 15 91 92 34 48 57 0 O1 0 O1 0.01 0. O0 0.01 0.01 0. O0 0.01 0.01 0.00 3137 66 N 2469 45 E 3992 88 N 38 12 E 3198 3260 3321 3383 3445 3507 3569 3631 3691 68 N 2520 04 N 2569 70 N 2619 72 N 2669 64 N 2719 25 N 2770 28 N 2821 07 N 2872 43 N 2923 15 E 4072 88 E 4151 56 E 423O 26 E 4309 55 E 4389 58 E 4469 78 E 4549 82 E 463O 92 E 4709 19 N 38 14 E 16 N 38 15 E 34 N 38 16 E 82 N 38 16 E 58 N 38 17 E 56 N 38 18 E 96 N 38 20 E O9 N 38 21E 13 N 38 23 E ARCO ALASKA, INC. P2 - 18 POINT MCINTYRE NORTH SLOPE, ALASKA COMPUTATION DATE' 6-JUL-94 PAGE 3 DATE OF SURVEY' 26-JUNE-94 KELLY BUSHING ELEVATION' 46.30 FT ENGINEER' D. WARNER INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 8000 O0 5919 96 5873.66 52 2 8100 8200 8300 8400 8500 8600 8700 8800 8900 O0 5981 O0 6043 O0 6105 O0 6166 O0 6228 O0 6291 O0 6353 O0 6415 O0 6478 57 5935.27 51 50 64 5997.34 51 45 34 6059.04 51 59 90 6120.60 51 59 80 6182.50 51 34 12 6244.82 51 23 60 6307.30 51 22 97 6369.67 51 24 59 6432.29 51 2 9000 O0 6541 58 6495.28 51 1 9100 9200 9300 9400 9500 9600 9700 9800 9900 O0 6604 O0 6667 O0 6729 O0 6792 O0 6855 O0 6918 O0 6981 O0 7043 O0 7105 47 6558.17 51 5 17 6620.87 51 9 80 6683.50 51 15 61 6746.31 50 51 59 6809.29 51 9 32 6872.02 50 52 40 6935.10 50 58 81 6997.51 51 44 92 7059.62 51 38 10000.00 7167 92 7121.62 51 36 10100.00 7229 10200.00 7291 10300.00 7354 10400.00 7416 10500.00 7478 10600.00 7541 10700.00 7602 10800.00 7664.54 7618 10900.00 7726.03 7679 93 7183 63 51 35 96 7245 09 7307 39 7370 78 7432 15 7494 83 7556 66 51 38 79 51 31 O9 51 25 48 51 21 85 51 39 53 52 0 24 51 55 73 52 24 1]000 O0 7786 97 7740 67 52 24 11100 11200 11300 11400 11500 116O0 11700 11800 11900 O0 7848 O0 7909 O0 7970 O0 8032 O0 8094 O0 8155 O0 8217 00 8279 O0 8340 12 7801 50 7863 96 7924 64 7986 27 8047 79 8109 47 8171 03 8232 05 8293 82 52 9 20 52 7 66 52 1 34 51 55 97 51 57 49 51 56 17 51 57 73 52 14 75 52 25 N 41 19 E 4786 37 N 41 46 E 4865 N 42 18 E 4943 N 42 19 E 5022 N 42 28 E 5100 N 42 34 E 5179 N 42 41E 5257 N 42 29 E 5335 N 42 48 E 5413 N 43 4 E 5491 10 44 O6 79 25 36 35 42 27 N 43 23 E 5568 80 N 43 26 E 5646 N 43 19 E 5724 N 43 7 E 5801 N 43 10 E 5879 N 43 3 E 5957 N 42 53 E 6034 N 42 51E 6112 N 42 57 E 6190 N 42 49 E 6268 41 17 99 68 23 99 48 51 77 N 42 41 E 6347.13 N 42 45 E 6425.49 N 42 43 E 6503.82 N 42 47 E 6582,08 N 42 46 E 6660.20 N 42 4? E 6738.25 N 42 28 E 6816.33 N 42 8 E 6894.97 N 42 3 E 6973.60 N 41 50 E 7052.41 Iq 43 42 E 7i31 66 N 41 26 E 7210 N 41 29 E 7289 N 41 24 E 7368 N 41 14 E 7447 N 41 I E 7525 N 40 57 E 7604 N 40 49 E 7683 N 4O 17 E 7762 N 40 2 E 7841 74 66 51 2O 93 75 45 25 47 0 O0 0 O1 0 O1 0 O0 0 O1 0 O0 0 O1 0 O0 0 O0 0 O1 0 01 0 01 0 01 0 O1 0 01 0 O1 0 O1 0 O0 0 O1 0 01 0 O0 0 O0 0 O1 0 O0 0 O0 0 O0 0 O1 0 O1 0 O1 0 O1 o Ol 0 O1 0 O0 0 O1 0 O1 0 O1 0 O1 0 O1 0 O1 0 O1 FEET FEET FEET DEG MIN 3750 81 N 2975 75 E 4787 87 N 38 26 E 3809 3867 3926 3984 4042 4099 4157 4214 4271 73 N 3028 90 N 3080 06 N 3133 29 N 3186 14 N 3239 65 N 3292 14 N 3345 63 N 3398 67 N 3451 02 E 4866 59 E 4944 60 E 5023 70 E 5101 82 E 5180 82 E 5258 65 E 5336 62 E 5414 77 E 5491 S1 N 38 29 E 76 N 38 32 E 28 N 38 36 E 92 N 38 39 E 29 N 38 43 E 31 N 38 46 E 22 N 38 50 E 21 N 38 53 E 98 N 38 56 E 4328 24 N 3504 98 E 5569.43 N 39 0 E 4384 4441 4498 4555 4611 4668 4725 4782 4840 76 N 3558 38 N 3611 21N 3665 03 N 3718 71N 3771 72 N 3824 63 N 3877 86 N 3930 36 N 3983 37 E 5646 96 N 39 4 E 88 E 5724 25 E 5802 41E 5880 53 E 5957 58 E 6035 31E 6112 52 E 6190 77 E 6268 65 N 39 7 E 41 N 39 10 E 04 N 39 14 E 54 N 39 17 E 25 N 39 19 E 70 N 39 22 E 69 N 39 25 E 93 N 39.27 E 4897 95 N 4037.05 E 6347 26 N 39 30 E 4955 59 N 4090.28 E 6425 55 N 39 32 E 5013 21 N 4143.49 E 6503 90 N 39 34 E 5070 72 N 4196.71 E 6582 14 N 39 37 E 5128 13 N 4249.84 E 6660 24 N 39 39 E 5185 50 N 4302.92 E 6738 29 N 39 41 E 5242 95 N 4355.93 E 6816 35 N 39 43 E 5301 27 N 4408.78 E 6894.98 N 39 45 E 5359.71 N 4461.47 E 6973.61 N 39 46 E 5418.34 N 4514.21 E 7052.42 N 39 48 E 5477 52 N 4566 98 E 7131 66 N 39 49 E 5536 5595 5654 5714 5773 5832 5892 5952 6012 74 N 4619 88 N 4671 98 N 4724 08 N 4775 38 N 4827 89 N 4879 42 N 4931 19 N 4982 77 N 5033 46 E 7210 75 E 7289 O0 E 7368 99 E 7447 81E 7525 52 E 7604 02 E 7683 38 E 7762 43 E 7841 75 N 39 50 E 66 N 39 51E 51 N 39 52 E 20 N 39 53 E 93 N 39 54 E 75 N 39 55 E 46 N 39 55 E 26 N 39 56 E 48 N 39 56 E COMPUTATION DATE: 6-JUL-94 PAGE 4 ARCO ALASKA, INC. P2 - 18 POINT MCINTYRE NORTH SLOPE, ALASKA DATE OF SURVEY: 26-JUNE-94 KELLY BUSHING ELEVATION: 46.30 FT ENGINEER: D. WARNER INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 12000 O0 8400 89 8354 59 52 32 12100 12200 12300 12400 12500 12600 12700 12800 12900 O0 8461 O0 8522 O0 8583 O0 8644 O0 8706 O0 8767 O0 8828 O0 8890 O0 8952 65 8415 50 8476 52 8537 85 8598 15 8659 50 8721 98 8782 43 8844 52 8906 35 52 35 20 52 21 22 52 16 55 52 8 85 52 11 20 52 11 68 52 4 13 52 0 22 51 28 N 39 55 E 7920 84 N 39 51E 8000 N 39 53 E 8079 N 39 54 E 8158 N 39 43 E 8237 N 39 29 E 8316 N 39 26 E 8395 N 39 27 E 8474 N 39 2 E 8553 N 38 50 E 8631 26 62 84 82 83 BO 67 55 93 0 O1 0 02 0 O0 0 O1 0 01 0 01 0 O1 0 O0 0 O1 0 O0 6073 55 N 5084 47 E 7920 84 N 39 56 E 6134 6195 6256 6316 6377 6438 6499 6560 6621 50 N 5135 38 E 8000 39 N 5186 27 E 8079 15 N 5237 12 E 8158 80 N 5287 70 E 8237 74 N 5338 O0 E 8316 70 N 5388 20 E 8395 67 N 5438.22 E 8474 80 N 5488.11E 8553 83 N 5537.30 E 8631 27 N 39 56 E 62 N 39 56 E 85 N 39 56 E 83 N 39 56 E 84 N 39 56 E 81 N 39 55 E 67 N 39 55 E 56 N 39 55 E 93 N 39 54 E 13000.00 9014.96 8968.66 51 24 13100.00 9077.24 9030.94 51 32 13200.00 9139.00 9092.70 52 1 13300.00 9200.53 9154.23 52 1 13355.00 9234.37 9188.07 52 1 N 38 7 E 8710.02 N 37 51 E 8788.21 N 37 47 E 8866.78 N 37 47 E 8945.56 N 37 47 E 8988.89 0.01 0.02 0. O0 0.00 0. O0 6682.90 N 5585.98 E 8710.02 N 39 53 E 8744.67 N 5634.01E 8788.21 N 39 52 E 6806.80 N 5682.19 E 8866.78 N 39 51 E 6869.11N 5730.48 E 8945.56 N 39 50 E 6903.37 N 5757.04 E 8988.89 N 39 50 E ARCO ALASKA, INC. P2 - 18 POINT MCINTYRE NORTH SLOPE, ALASKA COMPUTATION DATE: 6-JUL-94 TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG O0 994 O0 1945 O0 2805 0 O0 -46 3O 0 0 56 948 26 11 53 75 1899 45 22 39 36 2759 06 38 13 PAGE 5 DATE OF SURVEY: 26-JUNE-94 KELLY BUSHING ELEVATION: 46.30 FT 0 O0 1000 2000 3000 4000 5000 6000 7000 8000 9000 ENGINEER: D. WARNER INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG 0 O0 N 0 O0 E 0 O0 N 0 0 E 42 N 51 23 E 76 95 N 41 44 E O0 3505 O0 4121 O0 4719 O0 5313 O0 5919 O0 6541 85 3459 92 4075 26 4672 72 5267 96 5873 58 6495 55 49 42 62 52 49 96 53 58 42 53 2 66 52 2 28 51 0 O0 76 91 382 78 888 67 0 O0 0 02 0 O3 0 02 57 289 681 19 N 250 88 E 382 O0 N 570 94 E 888 37 E 1600 76 E 2387 55 E 3188 45 E 3992 75 E 4787 98 E 5569 N 0 0 E N 41 47 E N 39 37 E N 38 59 E O3 0 23 0 77 0 21 0 37 0 8O 0 O1 1239 01 1859 O1 2503 01 3137 O0 3750 O1 4328 98 N 1011 40 N 1497 36 N 1975 66 N 2469 81N 2975 24 N 3504 N 37 8 E 1600 N 38 13 E 2387 N 35 47 E 3187 N 40 7 E 3991 N 41 19 E 4786 N 43 23 E 5568 85 N 4O 57 E 67 N 39 59 E 13 N 39 12 E 60 N 38 51E 98 N 38 17 E 88 N 38 12 E 87 N 38 26 E 43 N 39 0 E 10000.00 7167.92 7121.62 51 36 11000.00 7786.97 7740.67 52 24 12000.00 8400.89 8354.59 52 32 13000.00 9014.96 8968.66 51 24 13355.00 9234.37 9188.07 52 1 N 42 41E 6347.13 N 41 42 E 7131.66 N 39 55 E 7920.84 N 38 7 E 8710.02 N 37 47 E 8988.89 0. O0 0.01 0.01 0.01 O. O0 4897.95 N 4037.05 E 6347.26 N 39 30 E 5477.52 N 4566.98 E 7131.66 N 39 49 E 6073.55 N 5084.47 E 7920.84 N 39 56 E 6682.90 N 5585.98 E 8710.02 N 39 53 E 6903.37 N 5757.04 E 8988.89 N 39 50 E ARCO ALASKA, INC. P2 -18 POINT MCINTYRE NORTH SLOPE, ALASKA COMPUTATION DATE' 6-JUL-94 TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN 0 O0 46 30 146 30 246 30 346 30 446 30 546 30 646 30 746 3O 846 3O PAGE 6 DATE OF SURVEY' 26-JUNE-94 KELLY BUSHING ELEVATION' 46.30 FT ENGINEER' D. WARNER 0 O0 46 30 146 30 246 30 346 31 446 42 546 62 646 97 747 82 849 07 INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH 0 0 N 0 0 E 0 17 N 54 4 W 0 12 N 73 46 W 0 8 N 20 6 E 1 25 N 51 17 E 3 14 N 47 I E 4 8 N 44 57 E 5 57 N 41 23 E 8 20 N 4O 16 E 9 48 N 40 53 E -45 30 0 O0 100 O0 2O0 O0 300 O0 400 O0 500 O0 600 O0 700 O0 800 O0 FEET DEG/IO0 FEET FEET FEET DEG MIN 0 O0 0 O0 -0 13 -0 21 0 68 5 26 11 52 19 82 32 89 48 71 0 O0 0 02 0 O0 0 O0 0 03 0 O0 0 01 0 O6 0 O0 0 02 0 O0 N 002 N 0 13 N 0 23 N 0 80 N 3 89 N 823 N 14 27 N 24 20 N 36 22 N 0 O0 E 0 02 W 0 36 W 0 60 W 0 11E 3 55 E 8 12 E 13 84 E 22 33 E 32 63 E 000 N O O E 0 0 0 0 5 11 19 32 48 03 N 45 7 W 39 N 70 17 W 64 N 69 3 W 81 N 7 38 E 27 N 42 24 E 56 N 44 36 E 88 N 44 8 E 93 N 42 42 E 74 N 42 I E 950 75 1052 1156 1260 1365 1471 1576 1681 1786 1892 946 30 98 1046 16 1146 49 1246 84 1346 40 1446 87 1546 90 1646 95 1746 94 1846 900 O0 11 7 30 1000 O0 12 58 30 1100 O0 15 23 30 1200 O0 17 44 30 1300 O0 18 39 30 1400 O0 18 42 30 1500 O0 18 9 30 1600.00 17 46 30 1700.00 18 4 30 1800.00 20 52 N 41 24 E N41 42 E N41 56 E N 42 31 E N 41 55 E N 41 11 E N40 11E N 40 13 E N 39 47 E N39 1 E 67 10 88 29 113 67 143 37 176 48 210 26 243 77 275 91 308 07 343 17 0 01 0 03 0 02 0 02 0 O0 0 O0 0 01 0 O0 0 01 0 02 50 08 N 65 84 106 131 156 182 206 231 258 44 71E 92 N 58 87 N 75 83 N 95 40 N 117 71N 140 11N 162 67 N 182 31N 203 53 N 225 67 14 N 41 45 E 80 E 88 70 E 113 75 E 143 98 E 176 37 E 210 24 E 243 96 E 276 63 E 308 80 E 343 33 N 41 44 E 73 N 41 44 E 45 N 41 52 E 59 N 41 55 E 39 N 41 51E 90 N 41 42 E O2 N 41 31E 17 N 41 22 E 25 N 41o 8 E 2000 59 1946 30 1900 O0 22 40 2110 2221 2333 2448 2564 2682 2802 2925 3052 08 2046 10 2146 93 2246 44 2346 94 2446 82 2546 78 2646 69 2746 54 2846 30 2000 30 2100 30 2200 30 2300 30 2400 30 2500 30 2600 30 2700 30 2800 O0 25 7 O0 26 36 O0 28 26 O0 29 58 O0 31 28 O0 32 41 O0 34 33 O0 36 31 O0 39 28 3185 50 2946 30 2900 O0 42 43 3323 3464 3609 3757 3908 4062 4223 4385 4548 23 3046 11 3146 36 3246 67 3346 44 3446 88 3546 57 3646 47 3746 53 3846 30 3000 30 3~00 30 3200 30 3300 30 3400 30 3500 30 3600 30 3700 30 3800 O0 44 7 O0 45 32 O0 47 9 O0 48 1 O0 49 7 O0 50 16 O0 51 52 O0 51 47 O0 52 35 N 39 37 E N 39 50 E N 39 23 E N 38 8 E N 37 28 E N 38 16 E N 40 12 E N 40 11E N 40 6 E N 38 21E 383 O1 427 56 475 78 528 O1 583 77 643 48 705 88 772 13 843 58 921 59 N 37 57 E 1009 N 37 52 E 1103 N 38 56 E 1202 N 39 16 E 1308 N 38 8 E 1417 N 37 8 E 1530 N 37 12 E 1648 N 37 42 E 1773 N 37 36 E 1901 N 38 12 E 2029 80 98 31 83 55 11 78 O1 74 0 03 0 O1 0 02 0 O1 0 O2 0 O1 0 O2 0 02 0 02 0 02 0 O1 0 O1 0 O1 0 O1 0 O1 0 O1 0 O1 0 O1 0 O1 0 O0 289.37 N 251 03 E 383 08 N 40 56 E 323.64 N 279 360.71N 310 401.44 N 343 445 57 N 377 492 78 N 413 541 17 N 453 591 63 N 496 646 24 N 542 7O6 73 N 591 49 E 427 33 E 475 05 E 528 18 E 583 82 E 643 22 E 705 15 E 772 22 E 843 5O E 921 62 N 40 49 E 83 N 40 42 E 05 N 40 31E 78 N 4O 15 E 48 N 40 1E 88 N 39 57 E 13 N 39 59 E 58 N 4O 0 E 59 N 39 56 E 775 69 N 645 52 E 1009 15 N 39 46 E 85O 928 1010 1094 1184 1278 1378 1478 1580 49 N 703 18 N 765 06 N 831 99 N 900 53 N 969 34 N 1040 13 N 1117 89 N 1194 38 N 1274 61E 1103 31E 1203 59 E 1308 74 E 1417 38 E 1530 45 E 1648 02 E 1773 86 E 1901 16 E 203O 81 N 39 36 E O0 N 39 30 E 34 N 39 28 E 87 N 39 26 E 63 N 39 18 E 24 N 39 9 E 97 N 39 2 E 26 N 38 56 E 04 N 38 53 E .- i ARCO ALASKA, INC. P2 - 18 POINT MCINTYRE NORTH SLOPE, ALASKA COMPUTATION DATE: 6-JUL-94 PAGE 7 DATE OF SURVEY: 26-JUNE-94 KF!!Y BUSHING ELEVATION: 46.30 ET ENGINEER: D. WARNER INTERPOLATED V~LUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMLrrH DEPTH DEPTH DEPTH DEG MIN DEG VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IOO FEET FEET FEET DEG 4711 84 3946 30 3900 O0 52 34 4876 5040 5206 5373 5541 5709 5877 6045 6214 22 4046 43 4146 28 4246 11 4346 05 4446 13 4546 05 4646 78 4746 76 4846 30 4.000 30 4100 3O 4200 30 4300 30 4400 30 4500 30 4600 30 4700 30 4800 O0 52 15 O0 53 0 O0 53 0 O0 53 24 O0 53 29 O0 53 31 O0 53 23 O0 53 40 O0 53 34 N 38 38 E 2158 82 N 39 2 E 2289 N 38 0 E 2419 N 37 39 E 2551 N 37 13 E 2685 N 36 29 E 2819 N 35 30 E 2954 N 35 11E 3089 N 36 25 E 3224 N 36 3 E 3360 26 47 70 11 86 64 09 63 57 O. O0 0 O1 0 O0 0 O1 0 O1 0 O1 0 O1 0 02 0 O0 0 O1 1681 43 N 1354 52 E 2159 15 N 38 51E 1783 1884 1989 2O95 22O3 2312 2422 2533 2643 04 N 1436 78 N 1517 40 N 1598 38 N 1679 31N 1760 59 N 1840 79 N 1918 19 N 1997 16 N 2077 34 E 2289 66 E 2419 67 E 2552 9O E 2685 87 E 2820 3O E 2955 09 E 3090 34 E 3225 73 E 3362 61 N 38 51E 85 N 38 51E 15 N 38 47 E 64 N 38 43 E 51 N 38 38 E 46 N 38 31E 14 N 38 22 E 89 N 38 15 E 03 N 38 10 E 6384 05 4946 30 4900.00 53 37 6552 6721 6887 7053 7216 7381 7546 7714 7880 16 5046 32 5146 87 5246 79 5346 97 5446 16 5546 98 5646 98 5746 27 5846 30 5000.00 53 35 30 5100.00 53 52 30 5200.00 53 3 30 5300.00 52 27 30 5400.00 52 19 30 5500.00 52 46 30 5600.00 53 6 30 5700 O0 53 34 30 5800 O0 52 7 N 37 38 E 3496.96 N 38 15 E 3632.03 N 39 6 E 3768.44 N 38 53 E 3901 61 N 39 43 E 4034 O0 N 38 53 E 4162 95 N 38 43 E 4293 14 N 39 40 E 4425 41 N 39 28 E 4560 40 N 40 39 E 4692 O0 O. 02 0.01 0. O0 0 O0 0 O1 0 O1 0 O1 0 O1 0 O0 0 02 2752.42 N 2159 69 E 3498 58 N 38 7 E 2859 10 N 2242 2965 3068 3170 3270 3372 3474 3578 3679 18 N 2328 62 N 2412 47 N 2496 49 N 2578 O1N 2659 54 N 2743 58 N 2829 65 E 3633 44 E 377O 33 E 3903 92 E 4035 31E 4164 86 E 4294 45 E 4427 44 E 4562 63 N 2913 75 E 4693 72 N 38 7 E 14 N 38 8 E 3O N 38 10 E 65 N 38 13 E 59 N 38 15 E 80 N 38 16 E 07 N 38 18 E O2 N 38 2O E 57 N 38'22 E 8042 81 5946 30 5900 O0 51 58 8204 8366 8528 8688 8848 9007 9166 9326 9485 30 6046 54 6146 13 6246 31 6346 55 6446 49 6546 74 6646 34 6746 21 6846 30 6000 O0 51 46 30 6100.00 52 0 30 6200 O0 51 28 30 6300 O0 51 20 30 6400 O0 51 13 30 6500 O0 51 0 30 6600 O0 51 12 30 6700 O0 51 9 30 6800 O0 51 2 N 41 35 E 4820 10 N 42 18 E 4946 81 N 42 21 E 5074 46 N 42 41 E 5201 25 N 42 28 E 5326 23 N 42 59 E 5451 28 N 43 23 E 5574 62 N 43 21 E 5698 32 N 43 3 E 5822 49 N 43 3 E 5945 74 0 O1 0 O1 O OO 0 O1 0 O0 0 O1 0 O1 o O1 0 O1 0 O1 3776 11 N 2998 08 E 4821 57 N 38 27 E 3870 3964 4058 4150 4242 4332 4422 4513 4603 39 N 3082 86 E 4948 82 N 3168 93 E 5075 35 N 3254 73 E 5202 41 N 3339.49 E 5327 39 N 3424.43 E 5452 47 N 3508.98 E 5575 55 N 3594.11 E 5698 20 N 3679.27 E 5822 13 N 38 32 E 62 N 38 38 E 26 N 38 44 E 10 N 38 49 E 03 N 38 55 E 24 N 39 0 E 82 N 39 6 E 89 N 39 11E 30 N 3763.67 E 5946 06 N 39 16 E 9644 31 6946.30 6900 O0 50 ,5.°.9_ 9804.02 7046.30 7000 9965.16 7146.30 7100 10126.36 7246.30 7200 10287 48 7346 30 7300 10447 95 7446 30 7400 10608 31 7546 30 7500 10770 43 7646 30 7600 10933 25 7746 30 7700 11097 03 7846 30 7800 O0 51 46 O0 51 43 O0 51 38 O0 51 3O O0 51 22 O0 51 43 O0 51 54 O0 52 27 oo 52 10 Iq 42 45 E 6069 30 N 42 58 E 6193 66 N 42 46 E 6319 85 N 42 45 E 6446 12 N 42 50 E 6572 29 N 42 48 E 6697 64 N 42 23 E 6822 83 N 42 3 E 6950 34 N 41 45 E 7078.75 N 41 26 E 7208.40 o oo 0 O1 0 O1 0 O1 0 O0 o O0 0 O1 0 O0 o O1 o Ol 4693 93 Iq 3847 gl E 6069 55 N 39 21 E 4785 17 N 3932 67 E 6193 85 N 39 25 E 4877 88 N 4018 52 E 6319 99 N 39 29 E 4970 76 N 4104 30 E 6446 22 N 39 33 E 5063 53 N 4190 05 E 6572 36 N 39 36 E 5155 65 N 4275 29 E 6697.67 N 39 40 E 5247 75 N 4360 32 E 6822.85 N 39 43 E 5342.43 N 4445.88 E 6950.35 N 39 46 E 5438.00 N 4531.76 E 7078.75 N 39 48 E 5534.98 N 4617.91 E 7208.40 N 39 50 E ARCO ALASKA, INC. P2 - 18 POINT MCINTYRE NORTH SLOPE, ALASKA COMPUTATION DATE: 6-JUL-94 PAGE 8 DATE OF SURVEY: 26-JUNE-94 KELLY BUSHING ELEVATION: 46.30 FT ENGINEER: D. WARNER INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 11259 89 7946 30 7900 O0 52 5 11422 11584 11746 11910 12074 12239 12402 12565 12728 15 8046 58 8146 75 8246 25 8346 74 8446 03 8546 35 8646 44 8746 24 8846 30 8000 30 8100 30 8200 30 8300 30 8400 30 8500 30 8600 30 8700 30 8800 O0 51 56 O0 52 5 O0 51 56 O0 52 26 O0 52 37 O0 52 26 O01 52 9 O0 52 7 O0 52 19 N 41 33 E 7336 89 N 41 13 E 7464 N 40 57 E 7592 N 40 45 E 7720 N 40 4 E 7849 N 39 51E 798O N 39 57 E 8110 N 39 43 E 8239 N 39 24 E 8368 N 39 19 E 8496 63 60 24 59 2O 55 68 51 97 0 O1 0 O0 0 O1 0 O1 0 O1 0 O1 0 O1 0 O1 0 O0 0 O1 5631 28 N 4703 05 E 7336 89 N 39 52 E 5727 5823 5920 6018 6119 6219 6318 6417 6516 19 N 4787 71N 4871 26 N 4955 99 N 5038 10 N 5122 12 N 5206 23 N 5288 62 N 5370 90 N 5452 48 E 7464 55 E 7592 O7 E 7720 65 E 7849 53 E 7980 12 E 8110 89 E 8239 86 E 8368 39 E 8496 63 N 39 54 E 60 N 39 55 E 25 N 39 56 E 60 N 39 56 E 20 N 39 56 E 55 N 39 56 E 69 N 39 56 E 51 N 39 56 E 97 N 39 55 E 12890.03 8946.30 8900.00 51 27 13050.28 9046.30 9000.00 51 29 13211.87 9146.30 9100.00 52 1 13355.00 9234.37 9188.07 52 1 N 38 49 E 8624.13 N 37 46 E 8749.31 N 37 47 E 8876.14 N 37 47 E 8988.89 0. O0 0.01 0. O0 0.00 6615.75 N 5532.41 E 8624.13 N 39 54 E 6713.90 N 5610.17 E 8749.31 N 39 53 E 6814.20 N 5687.92 E 8876.14 N 39 51 E 6903.37 N 5757.04 E 8988,89 N 39 50 E COMPUTATION DATE: 6-JUL-94 PAGE 9 ARCO ALASKA, INC. P2 - 18 POINT MCINTYRE NORTH SLOPE, ALASKa MARKER GCT LAST READING TD DATE OF SURVEY: 26-JUNE-94 KELLY BUSHING ELEVATION: 46.30 Fl' ENGINEER: D. WARNER INTERPOLATED VALUES FOR CHOSEN HORIZONS SURFACE LOCATION = 39' SNL ~ 1212' EWL, SEC14 T12N R14E MEASURED DEPTH TVD RECTANGULAR COORDINATES BELOW KB FROM KB SUB-SEA NORTH/SOUTH EAST/WEST 13170.00 9120.54 9074.24 6788.11N 5667.70 E 13355.00 9234.37 9188.07 6903.37 N 5757.04 E ARCO ALASKA, INC. P2 - 18 POINT MCINTYRE NORTH SLOPE, ALASKA MARKER GCT LAST READING TD COMPUTATION DATE: 6-JUL-94 PAGE 10 DATE OF SURVEY: 26-JUNE-94 KELLY BUSHING ELEVATION: 46.30 ET ENGINEER: D. WARNER ************ ~TRATIGRAPHIC SUMMARY SURFACE LOCATION = 39' SNL & 1212' EWL, SEC14 T12N R14E MEASURED DEPTH TVD RECTANGULAR COORDINATES BELOW KB FROM KB SUB-SEA NORTH/SOUTH EAST/WEST 13170.00 9120.54 9074.24 6788.11N 5667.70 E 13355.00 9234.37 9188.07 6903.37 N 5757.04 E FINAL WELL LOCATION AT TD: TRUE ,SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH 13355.00 9234.37 9188.07 HORIZONTAL DEPARTURE DISTANCE AZIMUTH FEET DEG 8988.89 N 39 50 E COMPANY ARCO ALASKA, INC. FIELD P2 ' 18 WELL POINT MCINTYRE COUNTRY USA RUN ONE DATE LOGGED 26-JUNE-94 REFERENCE 94232 All interpretations are opinions based on inferences from eteclTical or other measurements and we cannot, and do not guarantee the accuracy or correctness of an, yinterpreta,tions, and we shall not except in th, e case ,of gross., o.r w!l[ull negligence on our part. be. liable or ?.esponsi, bt,e for any?oas, ,c, psts, damages or expenses ~currep.or sus..~.!neo oy anyone resulting from any irrterp_retatJon, ~aoe oy a,r~ or ,o..u. r omcers, .age. n.~ or emp,oy.ees. e~ n,~cS~ ~n,z~rpretat,ons are also subject to our (,Jeneral/arms ano t.,ollo113Ol'lS as se! ou~ ii1 our currer~ prlce ~ eou e. I/ELL' P2-18 "~ (39' SNL, 1212' EWL, SEC 14, ,12N, R14E) HORZZONTAL PROdECTZO~ NORTH 12000 10000 8000 6000 4000 2000 -2000 SOUTH -4000 SCALE = I / 2000 ~N/~"r -6000 -4000 -2000 0 2000 4000 6000 8000 10000 WEST EAST WELL- P2-18 ~' (39' SNL, 1212' EWL, SEC 14, ¢12N, R14E) VERTICAL PROJECTION 22O o -4000 -2000 0 0 2000 4000 6000 8000 10000 12000 m m m I ' " ' : ' : I '~ 3;3355 PROJECTION ON VERTICAL PLANE 2200 - 40.0 SCALED IN VERTICAL DEPTHS HCCIIZ SCALE = 1 / 2000 IN/Fl' ALASKA OIL AND GAS CONSERVATION COMMISSION WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 April 13, 1994 Adrian Clark Drilling Engineer Supervisor ARCO Alaska, Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Point McIntyre P2-18 ARCO Alaska, Inc. Permit No: 94-60 Sur. Loc. 39'SNL, 1212'EWL, Sec. 14, T12N, R14E, UM Btmhole Loc. 1577'NSL, 1812'EWL, Sec. 1, T12N, R14E, UM Dear Mr. Clark: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill dOes not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. David W.~~Johnston Chairman ~/ BY ORDER OF THE COMMISSION dlf/Enclosures CC: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.005 ~v Re-Entry [] DeepenDI Service [] Development Gas [] Single Zone [] Multiple Zone[] !2. Name of Operator ;5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. KBE = 47.05' feet Point Mclntyre 3. Address 6. Property Designation P. O. Box 196612. Anchoraoe. Alaska 99519-6612 ADL 365548 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 2o AAC 25.025) 39' SNI_,- 1212' EWL~ SEC.' 14, T12N, R 14E Pont Mclntj/re At top of productive interval 8. Well number Number 1369' NSL, 1635' EWL, SEC. 1, T12N, R14E P2-18 U-630610 At total depth 9. Approximate spud date Amount 1577'NSL, 1812'EWL, SEC. 1, T12N, R14E 6/5/94 $200,000.00 12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth(MDa,d'rvD) property line ADL 34624-6855' feet No close approach feet 2560 13547' MD/9206' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth 300 feet Maximum hole angle53.69 o Maximum surface 3330 psig At total depth (TVD) 8800'/4590 psig 18. Casing program Specifications Setting Depth s~ze Top Bottcm Quantity of cement Hole Casing Weight Grade Coupling Length M D TVD M D TVD (include stage data) 30" 20" 91.5# H-40 ' Weld 80' 30' 30' 110' 110' 260 sx Arcticset (Approx.) 13-1/2" 10-3/4" 45.5# J-55 B TC 4202' 47' 47' 4249' 3700' 1278 sx CS IIl/354 sx "G"/250 sx CS II 9-7/8" 7-5/8" 29. 7# iNT95HS NSCC 12863' 45' 45' 12908' 8827' 9-7/8" 7-5/8" 29. 7# NT13Cr NSCC 639' 12908' 8827' 13547' 9205' 502 sx Class "G" 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor RECEIVED Surface I nte rmedi at e Production /\'P ~:~ ] ] ]~o:~ ~ Liner ~,iask~. 0il & Gas Cons. Commission Perforation depth: measured Anchorage true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program I-E Drilling fluid program E] '[ime/vs depth plot [] Refraction analysis I-! Seabed report[] 20 AAC 25.050_requirementsF-] 21. I hereby certify tl~t~e fCregoing i~r_,ue--,,ar~ cc',eot to the best of my knowledge ,n _ _/' S igned,~,]. E ,~_~,~~ ' ',~,/~.~r~'-"~ Title Dr/fling Engineer Supervisor //j~ I ?Date Commission Use Only Permit Number IAPI number Approv,¢l dee. See cover letter c~/-.~'d::~ 150-O.2_.~-- ~----~.?-/~/ . y//j/C'y for other requirements Conditidns of approval Samples required [] Yes I~ No Mud Icg' required []Yes [] No Hydrogen sulfide measures [] Yes 'J~ No Directional survey requ,red [] Yes [] NO Required working pressure for BOPE 1-12M; 1-13M; J~5M; r-I10M; I-J15M; Other: Original Signed By by order of David W. Johnston Commissioner tne comm,ssion Date ~/~/¢,~, Approved by ~ _! _,. .._ ~.,.,E/_l:---,i. , --orm 10-401 Rev. 12-1-85 Submit in trt)licate Well Name: P2-18 Well Plan Summary Type of Well (producer or injector): PRODUCER Surface Location: Target Location: Bottom Hole Location: 39' FNL, 1212' FWL, SEC 14, T12N, R14E 1369' FSL, 1635' FWL, SEC 1, T12N, R14E 1577' FSL, 1812' FWL, SEC 1, T12N, R14E AFE 2C0068 Number: Estimated Start 6/5/94 Date: Rig: DOYONRIG 4/14 Operating days to complete: 19 IMD: I13547' I ITVD: 19206. I [KBE: 147.o5' I Well Design (conventional, slimhole, etc.): SLIMHOLE LONGSTRING Formation Markers: Formation Tops MD TVD (KB) Comments T-8 4346 3757 WEST SAK 9665 6907 K-12 9876 7032 K-10 13127 8957 K-5/HRZ 13160 8977 KALUBIK 13194 8997 KUPARUK 13208. 9005 TI) 13547 9205 ~ !-~ ri ~/ I L PT MC INTYRE P2-18/J1 DRLG PERMIT April 8, 1994 11:26 AM Page 1 AP~ 1 ] 1994. Aiaska Oil & Gas Cons. Commission Anchorage Casint/Tubing Program: Hole Csg/ Wt/Ft Grade Conn Length Top Btm Size Tbg O.D. MD/TVD MD/TVD 30" 20" 91.5# H-40 WLD 80' GL 110/110 13-1/2" 10-3/4" 45.5# J-55 BTC 4202' 47' 4249/3700 9-7/8" 7-5/8" 29.7# NT-13CR80 ~ 639 12908/8827 13547/9205 9-7/8" 7-5/8" 29.7# NT-95 HS Ng~ 12863' 45' 12908/8827 'i'BG 4-1/2" 12.6# 13CR-80 NSCT 13015' 43' 13058/8916' gram' SURFACE ~ PRODUCTION GR/Resistivity/Neutron/Density (From top of K-10 to TD). Cased Hole Logs: NOhE Mud Program: ISpecial design considerations IFresh water dispersed mud to top of Kuparuk (3% KCL through Kuparuk) Surface Mud Properties: I SPUD Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.7 300 40-60 30-60 60-80 9-10 15-25 Intermediate Mud Properties- I Fresh /lightly dispersed Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.5 50 20-40 15-20 20-30 9-10 10-20 Production Mud Properties: 1 3% KCL with HTHP < 15 Density PV Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.5 8-15 15-30 5-15 10-20 9-10 5-8 APl 10.0 15-30 15-30 8-12 <25 9-9.5 5-8 APl HTHP < 15 PT MC INTYRE P2-18ill DRLG PERMIT April 8, 1994 11:26 AM Page 2 /~,PR '~ '1 1994 ~,,.~as~a oil & Gas Cons. Commission Anchorage Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Directional: I KoP: 130o' MD Maximum Hole Angle: Close Approach Well: 53.69° NONE The above listed wells will be secured during the close approach. Disposal-. Cuttings Handling: CC2A Fluid Handling: Haul to CC2A Annular Injection: ANNULAR INJECTION IS NOT ALLOWED AT PT MC INTYRE AT THIS TIME. AREA WELL PREV VOL PERMITTED PERMITTED DATES INJECTED VOL (aBES) (aBES) PT MC INTYRE P2-18/J1 DRLG PERMIT April 8, 1994 11:26 AM Page 3 Gas Cons. Commission Anchorage P2-18/J1' ,0-3/4" SURFACE CASING CEMENT PR~.,GRAM-BJ SERVICES CIRC. TEMP 50°F LEAD CEMENT TYPE: COLD SET III WEIGHT: 12.2 ppg YIELD: 1.92 ft3/sx APPROX #SACKS: 1278 sks (2454 cuff) TAIL CEMENT TYPE: CLASS G MIX WATER' 10.53 gps (50-65°F)Fresh THICKENING TIME: 4:30 hrs MIX WATER: 4.95 gps (50-65°F)Fresh THICKENING TIME: 4 hrs MIX WATER: 3.89 gps ADDITIVES: 2 % A-7 Calcium Chloride, .5 GHS FP-12L surfactant WEIGHT: 15.8 ppg YIELD:1.15 ff3/sx APPROX #SACKS: 354sx (407 cuft) TOP JOB CEMENT TYPE: Cold Set II WEIGHT: 14.5 ppg YIELD:0.96 ft3/sx APPROX #SACKS: 250 (235 cuff) SPACER: 50 bbls fresh water ahead of lead slurry. CEMENT VOLUME: 1. Lead slurry from 500' above shoe to surface w/80% excess. 2. Tail slurry volume 354 sx (500' + 100% excess + shoe volume). 3. Top job volume 250 sx. PT MC INTYRE P2-18/J1 DRLG PERMIT April 8, 1994 11:26 AM Page 4 RECEIVED Gas Cons. Commission Anchorage P2-',,./J1: 7-5/8" CASING CEMENT PROGRA,,,-BJ SERVICES CIRC. TEMP 135° F SPACERS: Pump 20 bbls 2% KCL water, followed by 70 bbls MCS-4 with 2% KCL at 1 ppg over mudweight. Follow the spacers with cement. CEMENT TYPE: Class "G" + 2% KCL ADDITIVES: 0.85% BA-10, 0.65% FL-33 fluid loss additive, 0.2% CD-32 dispersant, 0.3% A-2, 0.3% R-1 retarder, .5 ghs FP-12L surfactant WEIGHT:15.7 ppg YIELD: 1.19 ft3/sx MIX WATER: 5.12 gps fresh water APPROX #SACKS: 502 sx (597 CU FT) THICKENING TIME: 4 hrs OTHER CONSIDERATIONS: Perform lab tests on mixed cemenVspacedmud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at maximum rate (12- 15 bpm). CEMENT VOLUME: Order the cement volume based on the following: . 500' above the top of SISS (Stump Island Sandstone), or 1000' above the top of Kuparuk if not present. Calculate gauge hole plus 90% excess (excess factor = 1.9) Add 32 cuff for the 80' of 7-5/8" shoe joint. Add 30 cuft for cement left in the batch mixer and lines. SISS is PT MC INTYRE P2-18/J1 DRLG PERMIT April 8, 1994 11:26 AM Page 5 _ knch0ra~o . . . . . . . . . 10. 11. P2-18/J1 Operations Summary MIRU drilling rig. Spud well and drill 13-1/2" hole. Kickoff at 300' md and build hole angle to 53.69°, 40.43° azimuth. Continue drilling to 4249' md/3700' tvd. Set 10-3/4" casing and cement same. Test casing to 3000 psi for 30 minutes. Nipple up BOPs and test same to 5000 psi. Pick up 9-7/8" BHA and drill 10' of new hole and perform leakoff test. Drill 9-7/8" hole to TD of 13,547' md / 9205' tvd. Short trip then POOH. LD real time directional/gamma ray/resistivity tools. NOTE: PU real time directional/gamma ray/resistivity on first bit trip out of the shoe and utilize same LWD tools to TD. DO NOT PICK UP CDN TOOLS UNTILAFTER TD. PU LWD tools (CDN recorded). RIH and MAD pass f/top of Kuparud to TD. Short trip. POOH LDDP. RIH with 7-5/8" 13CR x L-80 casing and cement same, displacing with 8.6 ppg seawater. Test casing to 4000 psi for 30 minutes. RIH with 4-1/2", 13CR-80 completion assembly. ND BOPE and NU tree assembly. Test tree assembly to 5000 psi. Pump tubing full of diesel plus enough more to freeze protect the annulus to 2200' tvd. Set packer. Test tubing. Test annulus. Notify STATE for witnessing of annulus test. Secure well. Release rig. PT MC INTYRE P2-18/J1 DRLG PERMIT April 8, 1994 11:26 AM Page 6 gas Cons. Commission Anchorage / . Pmudhoe t~y Drilling Pmudhoe Bo, y Un i~ Poi n-C Mcln ~y~ e ~ P~-'18 VERTICAL VIEW SCALE 500 ~%, / DIV/$IDN ]-VD RE}-: ~-LLHEAD VERTICAL SECTIEN RE/: VR ~ HEAD 1~ ! 16,UO ~l,~lD 13-~3~ ! 1803 MIl 1 :~-,~, lO 3/4 In H^LLIBURTO~ H[]RIZ[]NTAL VIEW (TRUE KORTH) SCALE 5CO Fi;. / DIVISION SURVEY RE]r: WELLI-F_AD 500 0 500 1000 1503 L:~300 L::~330 3000 3500 4C00 4500 5000 5500 6,030 6500 Note: These error factors represent Standard Wolff & deWardt tool code settings. 53Y~0~ 8 6J55 ~ K-t5 C~ RECEIVED APR 1 1 1994 Uii & Gas Cons. Commission Anchorage VERTICAL SECTIEN ~: 40,43° CRII']E.~{_ F]]INT II~TA 9DC~ ~ N ~:~97 E E~979 ~ JT~'l::~et; ~ "PVD ~ E~ C~ld X Gr, ld Y Topge¢ Jl TVD 98C~,87 /MD 13547.~1 / VS 9058.93 /N/S 6895,85 N JE/U 5874,66 E I)ai;e P[o%-ted O'eated By Checked By ~ovea Dci;e WELL PERMIT CHECKLIST ADMINISTRATION ENGINEERING 1. 2. 3. 4. 5. 6. ~ 7. 8. 9. 10. ll. 12. 13. Permit fee attached .................. Lease number appropriate ............... Unique well name and number .............. Well located in a defined pool ............. Well located proper distance from drlg unit boundary..~ ~ Well located proper distance from other wells ..... Sufficient acreage available in drilling unit ..... If deviated, is wellbore plat included ........ Operator only affected party .............. Operator has appropriate bond in force ......... Permit can be issued without conservation order .... Permit can be issued without administrative approval. Can permit be approved before 15-day wait ....... APPR 14. Conductor string provided ............... 15. Surface casing protects all known USDWs ........ 16. CMT vol adequate to circulate on conductor & surf csg. 17. CRT vol adequate to tie-in long string to surf csg . . 18. CMT will cover all known productive horizons ...... 19. Casing designs adequate for C, T, B & permafrost .... 20. Adequate tankage or reserve pit ............. 21. If a re-drill, has a 10-403 for abndnmnt been approved. 22. Adequate wellbore separation proposed .......... 23. If diverter required, is it adequate .......... 24. Drilling fluid program schematic& equip list adequate 25. BOPEs adequate ..................... 26. BOPE press rating adequate; test to ~ 'psig.~ 27. Choke manifold complies w/API RP-53 (May 84) ...... 28. Work will occur without operation shutdown ....... 29. Is presence of E2S gas probable ............. GEOLOGY / 30. Permit can be issued w/o hydrogen sulfide measures .... Y F 31. Data presented on potential overpressure zones ..... Y/N 32. Seismic analysis gf shallow gas zones .......... / N /%w'.~; , 33. Seabed condition survey (if off-shore) ....... ./ Y N 34. Contact name/phone for weekly progress reports ..... ~' Y N [exploratory only] GEOLOGY: ENGINEERING: COMMISSION: BEW DW~ Comments/Instructions: HOW/jo- A:~ORMS~,cheklist rev 03/94 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this , nature is accumulated at the end of the file under APPENDIx. .. No special effort has been made to chronologically organize this category of information. Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: MWD RUN 4 AK-MM-940520 R. KRELL D. WESTER P2-18 500292247100 ARCO ALASKA, INC. SPERRY-SUN DRILLING SERVICES 23-SEP-96 MWD RUN 5 R. KRELL D. WESTER 14 12N 14E 39 1212 46.30 44.80 11.00 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 9.875 20.000 110.0 10.750 4324.0 13335.0 MWD - GR/EWR4. ALL DEPTHS ARE MEASURED BIT DEPTHS. MWD RUNS 1-3 ARE DIRECTIONAL ONLY AND NO DATA IS PRESENTED. MWD RUNS 4 AND 5 ARE DIRECTIONAL WITH GAMMA RAY (DGR/SGRC) AND PHASE-4 RESISTIVITY (EWR4). ROP DATA BETWEEN 9572' AND 9832' IS MAD (MEASURED AFTER DRILLING) DATA WHICH WAS ACQUIRED AFTER MWD RUN 3, WHILE TRIPPING IN THE HOLE FOR MWD RUN 4. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SLIMMARY PBU TOOL CODE GR RP $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH STOP DEPTH 9508.0 13266.0 9517.0 13276.0 BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE $ REMARKS: EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 4 9572.0 12944.0 5 12944.0 13335.0 MERGED MAIN PASS. CN WN FN COUN STAT ARCO ALASKA, INC. P2-18 POINT MCINTYRE NORTH SLOPE ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 250 Tape File Start Depth = 13350.000000 Tape File End Depth = 9480.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 61929 datums Tape Subfile: 2 332 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9508.0 12882.0 EWR4 9517.0 12892.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERS ION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: ll-JUN- 94 2.16 3.93 MEMORY 12944.0 9572.0 12944.0 0 51.6 51.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER P0278CGR6 P0278CGR6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 9.875 4324.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LIGHTLY DISPERSED 9.80 62.0 9.4 0 4.4 2.200 72.0 1.200 141.0 1.700 72.0 3.100 72.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 4. ROP DATA BETWEEN 9572' AND 9832' RUN 4 IS MAD (MEASURED AFTER DRILLING) DATA ACQUIRED AFTER MWD RUN 3. $ : ARCO ALASKA, INC. : P2 -18 : POINT MCINTYRE : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 224 Tape File Start Depth = 12950.000000 Tape File End Depth = 9480.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 55529 datums Tape Subfile: 3 291 records... Minimum record length: 62 bytes Maximum record length: 998 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH GR 12882.0 13266.0 EWR4 12892.0 13276.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: 13-JUN- 94 2.16 3.93 MEMORY 13335.0 12944.0 13335.0 0 51.4 52.2 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ TOOL NUMBER P0278CGR6 P0278CGR6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 9.875 4324.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: KCL POLYMER 10.10 65.0 9.1 0 4.0 .240 .120 .180 .330 70.0 149.0 70.0 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 5. $ : ARCO ALASKA, INC. : P2-18 : POINT MCINTYRE : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 31 Tape File Start Depth = 13350.000000 Tape File End Depth = 12875.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 69538 datums Tape Subfile: 4 96 records... Minimum record length: Maximum record length: 62 bytes 998 bytes Tape Subfile 5 is type: LIS 96/ 9/23 01 **** REEL TRAILER **** 96/ 9/23 01 Tape Subfile: 5 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 23 SEP 96 3:55p Elapsed execution time = 2.20 seconds. SYSTEM RETURN CODE = 0 ~ ...... - SCHLUMBERGER COMPANY NAME ~ ARCO ALASKA, INC, WELL NAME : P2-i8 FIELD NA~E : POINT MCINTYRE 80~OUG~ : MO~T~ S~OPE API NURSER ! 50-029-2~471-00 IS Ta~e VeriFication r, istlnn Chlumberger AlasKa Comp~]tinc Center 12-0CT-I994 10~14 D~TE : 94t10t~2 R~EI, ~A~E : 94727 PREVIOUS REEL : CO~E~, .... , ~,~i~ : ~Ci.) AI.,~K~ Ii'~C., PU]NT ~CINT¥~E P2-18, 50-029-22471 O0 D~T? : O~IGIN TAPE NA~E : o4~27 CONTINU~TIO~ P~EVIOU$ TA~E : CO~f~'r ThpF HEADER POI~T MWD/MAD LOGS ~ELL API NUMBER: OPERATOR: JOB JOB I:~U,~BER: LOGG.~NG SURFACE LOCATION SECTION: EI,EVATIO~'~ ( FT FRO?~ KE[~LY DERRTCK FLOOR I ST ST~I~G ?i<~p STp I ~,~iG P2-18 500292P47100 ARCO ALASKA, ][.MC SCHLUMBERGER {~.~h~ SERVICES 12-0CT-94 t4 39 1212 11,00 FIF)[,E CASING DRILL~?RS SIZE (IN) SIZE (IN) DEPTH CFI) ~,.g75 10'750 4324.0 PAGEI IS Tape vertflcatlon I, istlno chlUmberger AlasKa ComPutlnq CeDter 12-OCT-1 994 10:14 PROt,~UCTIOI~ # RFN,~RKS: k:ASNi)O~N _INTERVAL 12806 TO 133;J5 FT. CDR L~G NOT G~ P~OVYDED BY SDFRR~-6UN LOGGING TOOL. [,~D ~A.5 D~Pm',~ ADJ~STED TO CASED ~t06~ bOG. DENSITY LIS FOR¢IAT DATA FIL~ NAME : EDIT ,001 SERVICE : WhIC ¥~RSIO~ : o01C01 DATF : g4/i0/12 M~X REC SIZE : 1.024 FIL~ TYPE : LO LaST FiLE : FtLF EDITED DePth s~ift, ed and clipped DEPTH INCRE~E-~I: I..DWG TOOL CODE START DEPTH ~27 CURVE S~IFT DaT~ (~ASiIRED DEPT~) PASELINE D~H 12927.5 !2911,5 128aa,5 2g00,0 ~ATA SOURCE TOOl, CODE curves: all bit runs STOP DEPTH ....... ---FQUIVAt, ENT UNSHIFTED [)EPT~{---------- ~8a87.o ~2926.5 t2gi~..5 12~9o.5 ]2~o2.o 1o2.o ~ERGE BASE IS ~a~e verification blstlno Chlumberger ^las<a ComPutlnc Center 12-0CT-1994 10114 RF~aRK$: ~6NDO~N INTERVAL 12806 TO 13335 FT. GR PRO¥IDFD ~¥ SFFRRY-SUN LOGGING TOO;.,. bwO TIED TO CASE[: HOLE PERFORATING LOG. CAS~D aOb~ (;~{ ~A$ DIGITIZED, $ LIS FORMAT ~ATa PAGE: 3 T~BLE TYPE : VALU DEFI ARCO Ah~SK~{RINC. Compan~ Name ~CI~J E Field ame FN POINT APlS~ 50-029-22471-00 FL 39' 6NL & 1212' EWG SECT 14 R~G COUN NORTH SbOPE STAT ALASKA N~TI USA PDAT ~EAN SEA LEVEL EPD PT 0 ADD FT 35,3 EKB FT 46,3 EDF FT 44,S EGL PT TO[) PT 13~55. T[,I PT 12740 DFD ~/C3 9,800601 DEGF Well Name ~PI Serial Number Field bocation Section Township Range County State or Province Natlo~ Permanent datum Elevation of Permanent Datum Log ~easured From Above Permanent Datum Elevation of Kell~ ~ushing Elevation o~ Derr c, Floor Elevation of Ground Level Total Depth - Driller Total DePth - LogDer Bottom Log Interval Top Log Ihterval Orillin~ Fluid Density . Resisti~ttF of Mud Sample ~ud Sample Temperature~ ~esistivltF o~ ~ud Filtrate S Mud Filtrafe Sample Temperatu Bottom Hole Temperature T~BLE TYPE : CUP¥ OEFT ':;::'"rrrrr ..................... - .... '-'- ..... - ....... ''' RgOB aulK Density DRHO Delta RKO PEF P~o~oglectric Factor CALK ~UCLKA~ CALIPER NPH! Thermal Neutron Porosity ROP PATE OF PE~ETRATIO~ IS Ta~e Verification Llstln~ Chlumberger AlasKa Computing Cemter i2-~CT-19g4 !O;14 PAGES DEFI G~ Gamma Ray NCN? ~VER~GM ~,~EAR HELIU~ COgeNT ~ATE FCNV AVERAGE FAR HE COUNT RATE DATA Fn.~AT SPECTFTCATTON ~ECOPD ** SET TYPE 64E.? ** TYPE REPR CODE 1 66 2 66 0 3 73 40 4 66 5 66 b 73 7 65 8 68 0,5 9 65 FT ~1 66 25 ~ 68 13 66 0 14 65 FT 15 66 68 16 66 0 66 ** SET TYPE - CHAM ** .,,.,.-......-.--.-.---.----.-..,,,-..,---,.,-,-...---.-..-.--.--...---.-..--.---.---.- M $~IRV UNIT SERV'TC~ APl A I P ILE NUmb NUMB SIZE R'~PR PROCESS ID ORDER # bOG TYPE CbA. SS ~OD NUmb SAMP ELEM CODE (HEX) .............. ............... ..... ,.................................. D~PT FT O0 0 0 0 1 1 4 68 0000000000 RHOB ~WD G/C3 O0 000 O0 0 I I 1. 4 68 0000000000 DRHO ~D G/C3 O0 000 O0 0 1 1 I 4 68 0000000000 PEF ~D SNI~ O0 000 O0 O ! I ~ 4 68 0000000000 CAbN ~D IN O0 000 O0 0 I ~ I 4 68 0000000000 NPHI ~D PU-S O0 000 O0 0 I ! 1 4 68 0000000000 ROP ~WD FDHR OO 000 O0 0 i I t 4 68 0000000000 GR ~D GAPI OO 000 O0 0 1 1 ~. 4 68 0000000000 NCNT ~[) CPS 00 OOO 00 0 I I 1 4 68 0000000000 FCNT ~D CPS O0 O00 O0 U 1 1, l 4 6~ 0000000000 DATA Tame Verification bist.~i, nq chlumherger AlasKa CompuSa. hq Center 12-0CT-!.994 10:14 PAGE: DEPT. 13250,00u CAb~.t~h 10.064 NCNT.~?~D 2~2.9~7 FC~T.~¼WP DEPT 13000 NCNT.~O 281.500 PCNT.~WO DEPq~ 12750,000 CALM: ~i~.~D 10,679 NCNT.~W5 251,500 PC~"iT. M k' D DEPT 12740 000 CALN;~D -999;250 NCMT.~e~D -999,250 FCNT.P~D ** E~iD UP DATA 2,408 DRHO,M~{O 19,g60 ROP,;.4WD 8,7~8 2,295 O~HO.N~D 24.000 ROP.~IWD 6.658 1.943 DRHO.~WO 41,800 ~OP.~twO 4.583 -999.250 ORMO.MWD -99g.~50 ROP.~WD 5.950 -999.250 40.724 0.005 79.82] -0.038 77.812 0.056 -999,250 -ggg.~50 -999.~50 PEF.~WD GR.~D PEF.MWD GR.M~D PEF.M~D G~,~D PEF,MWD GR.MWD PEF,~wO GR,~D -999.250 -999,250 3.110 48.809 3.731 32.864 10.698 152,603 '999,250 103.140 **** FILM TRAILER **** FILF WA~E : EDIT ,00! SERVICE : PhIC VERSIO~ : O0~COI DATF : 94/10/12 FIL~ TYPE : LAST PiLE : **** FILE HEADER **** FILM NA~$ : EDIT. .002 SERVICE : FLIC VERSInN : O0~CO1 DATF : q4/10/12 ~AX REC SIZE : FILF TYPE : LO FILF ~)U!~BER 2 Curves and log header data BIT RU~ ~]~ER: 1 D~PTH I~CRE~6NT: ri,M000 for each hit run ~n separate files, IS ?ave Verification Listl. nq chlumherqer AlasKa Comp,tina Center PA~E= FILF SUMMARY I.,D~G TOO[, CODE START 40 DATE bOGGED: SOFTWARE: SURFACE $OFT~ARE VERSION: DO~NHObE SOFTWARE VERSIONS: DATA TYPE (~EMORY or ~EAL-TIME): TD DRILLER TOP LOG INTERYAb ROTT~ b~G INTERVAL ~IT ROTATING SPEED ~OLE INC~I~ATION (DEG) ~ibXI~Ug A~GLE: STOP DEPTH 13355.o 20 2 2.~D 13355.0 ~2740.0 13355.O 44.9 TOOL ST~iNG (TOP Ti0 BOTTOM) VENDOR TOOb CODE TOOL Type CDM DENSITY/NEUTRON $ BOPENOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): BO~EHOLE CONDITIONS' aUD TYPE: ~UD DENSITY (LB/G): ~UD VISCOSITY FLUID bOSS MAXIMUM RECORDE~ TEgPERATURE (DEGF)~ RESISTIVITY (OHMM) AT TEMPERATURE MUD AT MEASURED TEMPERATURE (MT): ~UD AT ~iAX CIRCUt, ATING TEMPERATURE gOD FiLTrATE AT gOD CAKE AT ~E!IT~OM TOOL ~TRIX: ~A~I× DENSITY: ~iObE CORRECTION (IN): TOOh STANDOFF E~P FRE~[JENC'Y (HZ): ************ RU~! ~ ************* ~SNDO~N I~TER'V~L 12806 - 13355 FT G~ PROVIDED aY SPFRPY-SUN LOGGI~G TOOI~ TOOb NUHBER NDS057 9 87 155.0 2,200 1,960 SANDSTONE 2.65 72.0 69.0 IS Ta~e Yertficatlon l,],sting chlumberger AlasKa Computlnq Center 12-OCT-lgq4 10:!4 MlXla{la HOL~ ~NCLE = 44 9 QEG @ DEN O ~I'r:&l 09 i~EUT TO BIT: .07' $ FT PAGE: 7 TABt. E TYPE : CO~:$ TUNI VALU DEFI ARC~-~$O A KA, INC. Company Name POINT I~iCINTYRE Field Name F~ W~ P2-18 API, 50-029-22471-00 FL 39' SNb & 1212' EWL SECT 14 TOW~ 12N COUN NORTH SLOPE STAT ALASKA N~TI USA POAT MEAN SEA LEVEL EPD WT 0 L~F K~LLY BUSHING APD WT 35,3 EKB FT 46.3 EDF FT 44,8 EGL ~T 11 TDD PT 13~55. TD5 PT 13355, R~FS OH~ i ~6 Well Name AP1 Serial Number Field Location Section Township Range County State or Province Nation Permanent datum Elevation of Permanent Datum Loo ~easured From Above Permanent Datum Elevation of Kelly Bushing Elevation of Derrlc~ Floor Elevatlon of Ground Level Total DePth - Driller Total Depth - Logger Bottom Log Interval Log Interval T°~llln~ FlUid Densit Resistivity of ~ud Sa pie ~ud Sample Temperature Reslsti~tt~ of ~ud Filtrate~$ Mud Filtra e SamPle Tempera u Bottom Hole Temperature TABLE TYPE : CURV DEE'I D~PT R~O~ DPH! DPHO PEF DCAL T~PN ROPE De~t~ ~ulk [~enslt~ r~ensttV Porosity Pel. ta PHO PhotoElectric Factor Differential Caliper Thermal Neutron Porosity RATE OF PE~ETR~T:IO~ chlUmberger AlasKa Computlnq Center 12-OCT-Igg4 10:14 PAGE~ ** DATA FORMAT SPeCIFICaTION RECORD ** SET TYPE - b4EM ** TY~E REPR CODE VALUE 1 66 0 2 66 3 73 4 66 5 66 7 65 8 68 9 65 13 66 14 65 i5 66 16 66 0 66 0 44 1 0 FT 6~ NAMF SERV OMIT SER ICE APl API APi API FILE MU~B NUMB SIZE R~PR PROCESS ID ORDER ~ bOG TYPE CLASS ~OD NUmB S~P ELEM CODE (HEX) D~PT FT O0 000 O0 0 2 ~ 1 4 68 0000000000 RHOB LW~ G/C3 O0 000 O0 0 2 I 1 4 68 0000000000 DPHI L~i PU O0 000 O0 0 2 1 I 4 68 0000000000 D~HO 5~1 G/C3 O0 000 O0 0 2 I 1 4 68 0000000000 P~F I,~l BN/E O0 000 O0 0 2 I 1 4 68 0000000000 DCAL L~I IM O0 000 O0 0 2 I 1 4 68 0000000000 TNP~ [,~! PU O0 000 O0 0 2 1 1 4 68 0000000000 ROpE I~W1 FtH~ O0 CO0 O0 0 2 I 1 4 68 0000000000 G~ L~i GAPI O0 O00 O0 0 2 ! 1 4 68 0000000000 HE~ b~l. CPS O0 OOO O0 0 2 I I 4 68 0000000000 HEF~ [.,~1 CPS O0 Goo O0 0 2 1 1 4 68 0000000000 * * D ~ T A , * IS Tame Verification Listino :hlUn~berq,r AlasKa Computino Center PAGE~ DEPT 13335.500 aHn~.bWl PE~],~I -999.25~ OCAL.L~I GP.!.~I -999.250 U~NA.LW1 D~PT 13250.00U PHO6.L¥~I PEm:L~l 3.2~5 DCAb.hWl G~.Lwl 50.510 HENA.bW~ DFPT. 1300Q.000 RHOB.L~I PEF.L~! 4.367 DCA~.LNI G~.L~I 30.783 gENA.!,WI DEPT. 1~750.000 RHOB.LWl PEF.I, WI 10.390 9CAb. L~I G~.L~I 145.205 D~PT. 12738.000 PEF.L~I -999.250 DCAh. LW1 -999.250 DPMI.LW1 -999.250 TNPH,LWi -gge.$50 HEFA.bWl 286.125 HEFA.5~I 2.396 DPHI.b~I 0.424 TNPH.hW1 283.333 MEFA.GWl 2.015 DPHI.hW1 1.024 TNPH.LW1 262.375 5.{EFA.LWl -99g.250 DPHI.bNI -999.250 TNPH'bW1 -99g.~§0 NEFA.bWl -999.250 -999.250 -999.~50 13.900 18.700 8.438 1!.000 24.700 7.238 30.700 38.400 5.463 -999.250 -999.250 5.950 DRHO.LWl ROPE.I,~I DRHO.LW1 DRHO.I,W! ROPE.LWI DRHO.LW1 ROPE.LW1 -999.250 40.724 -0.01~ 80,00 -0.012 ';9,100 0.048 -999.250 ~999 250 999:250 :~* ENU OF T)ATA **** FILE TRAILER **** FILE MA~E : EDIT .002 SERVICE : FblC V~R$IO~,i : OOlCO1 DAT~ : 94/1o/12 ~X R~C SIZE : 10~4 FILM TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAaE : ~DIT DATE : g~/lO/12 ORIGIN : TAPE HA~E : 94227 CONTINUATION ~ : 1 PREVIOUS TAPE COM~ENT : ARCO POINT ~CINTY~E P2-18, 50-029-22471-00 **** REEL ~RAILER **** D~T~ : 94Ii¢!t12 OPI~IN : FLIC RFEL ~A~E : q4~27 CONTIN~]ATIO~ # PREVIOUS CO~E~T : ARCi3 POINT ~CINTY~E P2-18, 50-029-22471-00