Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout194-075 Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Monday,June 18, 2018 10:57 AM To: Regg,James B (DOA);AK, OPS EOC Specialists;AK, OPS GC2 Facility OIL;AK, OPS GC Field O&M TL;AK, OPS GC2 OSM;AK, OPS GC2 Wellpad Lead;AK, OPS PCC Ops Lea ; AK, OPS Prod Controllers;AK, OPS Well Pad HUQ;AK, OPS Well Pad LV;AK, OPS Well Pad MN;AK, OPS Well Pad RJ;AK, OPS WELL PAD S;AK, OPS Well Pad SW;AK, OPS WELL PAD W;AK, OPS Well Pad Z;Ak, Ops West Area IL;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr;AKOpsProdEOCTL; Draughon,Austin; Duong Lea; Frankenburg,Amy; Peru, Cale; Rupert, C. Ryan;Wellman,Julie;Youngmun,Alex; Zoesch, Eric Cc: Wallace, Chris D (DOA);AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, GWO W II Integrity Well Information;AK, OPS FF Well Ops Comp Rep;AKIMS App User; Cismos i, Doug A; Daniel, Ryan; Dempsey, David G; Dickerman, Eric; Hibbert, Michael;Janowski, Carrie; Montgomery, Travis J; Munk, Corey;Obrigewitch, Beau; O'connor, Katherine; Romo, Louis A; Sternicki, Oliver R;Tempel,Joshua;Worthington,Aras J Subject: OPERABLE: Producer N-26(PTD#1940750) Passed MIT5 post GLV change out. external-email: 0 All, Producer N-26(PTD#1940750)was put Under Evaluation on 05/27/18 for having a history of IA repressurization.On 06/15/18 Slickline replaced the OGLV and set a plug. Fullbore subsequently performed a passing MIT-T to 2,295 psi an• passing CMIT-TxIA to 2,437 psi.The passing pressure tests confirm the presence of two competent well barriers.The well is now classified as OPERABLE. Please respond with any questions. Andrew Ogg SCANNED JUN 2 a alb Well Integrity Engineer BP Global Wells Organization-Alaska Office:907-659-8110 From. : , A O Well Integrity Engineer Sent: Sunday, May _ , -S 8 11:03 AM To: 'Regg, James B (DOA) (jim. _• . alaska.gov); AK, OPS EOC Specialists; AK, OPS GC2 Facility OTL; AK, OPS GC2 Field O&M TL; AK, OPS GC2 OSM; AK, •= C2 Wellpad Lead; AK, OPS PCC Ops Lead; AK, OPS Prod Controllers; AK, OPS Well Pad HUQ; AK, OPS Well Pad LV; AK, •' ell Pad MN; AK, OPS Well Pad RJ; AK, OPS WELL PAD S; AK, OPS Well Pad SW; AK, OPS WELL PAD W; AK, OPS Well Pal ; k, Ops West Area TL; AK, RES GPB East Wells Opt Engr; A RES GPB West Wells Opt Engr; AKOpsProdEOCTL; Draughon, • • Duong, Lea; Frankenburg, Amy; Peru, Cale; Ru•=rt, C. Ryan; Wellman, Julie; Youngmun, Alex; Zoesch, Eric Cc: 'chris.wallace@alaska.gov'; AK, GWO Completions Well Integrity; AK, GWS •- , Well Integrity; AK, GWO Projects Well Integrity; AK, GWO SUPT Well Integrity; AK, GWO Well Integrity Well Information, • , OPS FF Well Ops Comp Re.; AKIMS AppUser; Cismoski, Doug A; Ryan; Dempsey, David G; Dickerman, Eric; Hi be ".chael• Janowski, Carrie; Montgomery, Travis Munk, Corey; Obrigewitch, Beau; O'connor, Katherine; Romo, Louis A; - •'cki Oliver R• 9 rY, J; Y 9 Tempel, Joshua; Worthington, Aras J Subject: UNDER EVALUATION: Producer N-26 (PTD #1940750) Needs MLTs to prove barrier integrity 1 • • Wallace, Chris D (DOA) From: AK, GWO Well Integrity Engineer <AKGWOWellSiteEnginee@bp.com> Sent: Sunday, May 27, 2018 11:03 AM To: Regg,James B (DOA);AK, OPS EOC Specialists;AK, OPS GC2 Facility OTL;AK, OPS GC2 Field O&M IL;AK, OPS GC2 OSM;AK, OPS GC2 Wellpad Lead;AK, OPS PCC Ops Lead; AK, OPS Prod Controllers;AK, OPS Well Pad HUQ;AK, OPS Well Pad LV;AK, OPS Well Pad MN;AK, OPS Well Pad RJ;AK, OPS WELL PAD S;AK, OPS Well Pad SW;AK, OPS WELL PAD W;AK, OPS Well Pad Z;Ak, Ops West Area IL;AK, RES GPB East Wells Opt Engr;AK, RES GPB West Wells Opt Engr;AKOpsProdEOCTL; Draughon,Austin; Duong, Lea; Frankenburg,Amy; Peru, Cale; Rupert, C. Ryan;Wellman,Julie;Youngmun,Alex; Zoesch, Eric Cc: Wallace, Chris D (DOA);AK, GWO Completions Well Integrity;AK, GWO DHD Well Integrity;AK, GWO Projects Well Integrity;AK, GWO SUPT Well Integrity;AK, GWO Well Integrity Well Information;AK, OPS FF Well Ops Comp Rep;AKIMS App User; Cismoski, Doug A; Daniel, Ryan; Dempsey, David G; Dickerman, Eric; Hibbert, Michael;Janowski, Carrie; Montgomery,Travis J; Munk, Corey;Obrigewitch, Beau;O'connor, Katherine; Romo, Louis A; Sternicki, Oliver R;Tempel,Joshua;Worthington,Aras J Subject: UNDER EVALUATION: Producer N-26 (PTD#1940750) Needs MITs to prove barrier integrity All, Producer N-26 (PTD#1940750) has a history of IA repressurization when shut in, but consistently passes TIFLs.The well was shut in on 05/24/18 and subsequently broke NOL.The T/I/O pressures were 2020/2040/0 psi. DHD performed a cold TILF that passed, but the well has exceeded the allowable number of TIFLs before integrity has to be proven with a positive pressure test as outlined in the Well Integrity Reference Manual.The well will now be classified as UNDER EVALUATION to perform MITs. MAY 3 U 2[11 Plan forward: 1. Slickline: Change out GLVs 2. Fullbore: Perform MITs 3. Well Integrity Engineer:Additional diagnostics as needed. Please respond with any questions. Andrew Ogg Well Integrity Engineer BP Global Wells Organization-Alaska Office:907-659-8110 1 STATE OF ALASKA r A. _,KA OIL AND GAS CONSERVATION COMMISSION 0�Y 5 20 14 REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon U Repair Well U Plug Perforations U Perforate U OtherU *,•' ,A „;, I Performed: Alter Casing ❑ Pull Tubing"' Stimulate-Frac ❑ Waiver ❑ Time Extension❑ Change Approved Program ❑ Operat.Shutdown"' Stimulate-Other ❑ Re-enter Suspended Well"' 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: BP Exploration(Alaska),Inc Developments Exploratory ❑ 1 194-075-0 3.Address: P.O.Box 196612 Stratigraphic❑ Service ❑ 6.API Number: Anchorage,AK 99519-6612 . 50-029-22483-00-00 j 7.Property Designation(Lease Number): 8.Well Name and Number: r ADL0028282. PBU N-26 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): '10.Field/Pool(s): PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth measured . 10820 feet Plugs measured None feet true vertical 9238.79 feet Junk measured None feet Effective Depth measured t 10734 feet Packer measured 10031 feet true vertical 9153.79 feet true vertical 8461.06 feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"91.5#H-40 30-110 30-110 1490 470 Surface 3380 10-3/4"45.5#NT-80 30-3410 30-3080.71 4560 1730 Intermediate None None None None None None Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner None None None None None None Perforation depth Measured depth _10170-10171 feet 10264-10268 feet 10268-10272 feet 10272-10286 feet 10286-10294 feet 10330-10350 feet True Vertical depth 8597.66-8598.64 feet 8690.15-8694.08 feet 8694.08-8698.02 feet 8698.02-8711.82 feet 8711.82-8719.7 feet 8755.18-8774.89 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 25-10095 25-8523.96 Packers and SSSV(type,measured and true vertical depth) 8461.06 10031 8461.06 Packer None None None SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): SCANNED JUS! 1 9 2014. RBDM MAY 16 2014 Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 154 3347 1386 1706 177 Subsequent to operation: 261 4252 2214 1499 184 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Developments i Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil. U Gas Li WDSPLU GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG❑ III 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Garry Catron Email Garry.Catron( BP.Com Printed Name Garry Catron Title PDC PE Signature firthett Phone 564-4424 Date 5/14/2014 (( V7-F 5/0 oil 4- - 'A/7 Form 10-404 Revised 10/2012 Submit Original Only m a. oo00 R '- N- to -p - LnI vr. 0 rnosrn CD C) N• — CO CO v CO o �') cooi rn Mori M N O ►N O Cr) CO ON. O O O Nco Ce) N CO iW C OC) to - — co O .0 - Oco O M O r C.) ctityclCO 2 QN CO or. rnou) N c�) N CO M N C pco 0 � J H 0 O O O Q oLP_ COcoco C = Z co Z M co in c\I U o = N N o � � v 0)O I O COO r` C• °D rn M a X• 00 W .0 C.) (° 000LLZ VZOOCCm OCLCC » U dCI- (/) H • Ir II Z 0 p- < I- I- U z Luƒ / R 0 / < - . ii I / \ / z2 2 0 i < / 0 > en 0 0 _1 § ƒ $ J / '47.- \ w / c 0- Z -) Z q L \ I # / " I _ 2 ƒ $ 1- (7)- q U) 0 N g o E@ \ 2 w 2 ct ; p @ ,- G o 1- t 0 < \ / � l (0 LLJ a 0. < R 11 6663 \ ƒ \ 2 o o J ƒ $ 2 �� & / ® < rZ Z " J \ a / � 060 • O / 2 > �� �� z I / co / 6E / \ / O / a / / -7 < - ƒ \ < � N- � \ ƒ U I- lip O / L 12 - \ ƒ i_ \ R / / / _1 � \ - ? / / � Li \ / ® ' E / / E \ b _ { / 2 I o U < n E ± t m #O N CO 4 WI Y. { TREE= 4"CNV WELLHEAD= 13-5/8"FMC -� SAFt1Y NOTES: CHROME TBG AND CSG ACTUATOR= BAKER OKB.E.EV= 73.9' BF.ELEV= 43.4' KOP= 1304' Max Angie= 45'@5833' 2090' —14-1/2"OTIS FIXO SSSV NP,D=3.813" Datum MD= 10450' Datum ND= 8800'SS GAS LFT MANDRELS 10-3/4"CSG,45.5#,L-80,0=9.953" H I 3410' ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 3341 3026 39 OTIS DOME BK /r 16 06/07/96 4 5969 5009 44 OTIS DOME BK ' 16 09/12/12 Minimum ID = 3.726" @ 10084' 3 8235 6777 25 OTIS DOME BK ' 16 06/07/96 4-1/2" OTIS XN NIPPLE I-1 2 9797 8231 11 OTIS DMY BK IF 0 06/07/96 '1 1 9943 8374 11 OTIS SO BK ' 20 09/12/12 7-5/8"CSG,29.7#,L-80,0=9.953' H 9898' h--1 I I 8971' —4-1/2"OT1S X NP,D=3.813" Z 10036' —17-5/8-X 4-1/2"TIW HBBP PKR,D=3.93" I I 10067. —44-1/2"OTIS X NP,D=3.813" I I 0 1084' —14-1/2"OTIS XN NP,D=3.725" 4-1/2"TBG,12.6#,13-CR,.0152 bpi,D=3.958" —{ 10095' ) \ 10095' H4-1/2"WLEG,D=3.958" 10093' H ELMD TT LOGO 08/03/94 PERFORATION SUMMARY _ REF LOG:TE Fl LOGBHCS ON 07/23/94 I ANGLE AT TOP PERF: 11'@ 10170' Note:Refer to Production DB for historical perf data SEE SPF NTERVAL Opn/Sqz SHOT SQZ 3-3/8" 6 10170- 10171 0 04/18/14 ... 3-3/8" 6 10264-10294 0 08/30/95 3-3/8" 4 10264-10268 S 08/03/94 06/04/95 3-3/8" 6 10264- 10268 S 03/17/95 06/04/95 3-3/8" 6 10264-10268 0 06/08/95 I 2-9/16" 4 10264- 10268 0 06/19/95 3-3/8" 4 10272-10286 S 08/03/94 06/04/95 3-3/8" 6 10272-10286 S 03/17/95 06/04/95 3-3/8" 6 10272-10286 0 06/08/95 2-9/16' 4 10272- 10286 0 06/19/95 — 3-3/8' 6 10330-10350 S 03/17/95 06/04/95 I PBTD H 10734' •••••••••• lit„ at ittatit M 7-5/8"CSG,29.7#,13-CR 80,0=6.875" -1 10810' •..................... DATE REV BY COMMENTS DATE REV BY CONSENTS FRUDIAOE BAY INT 07/27/94 ORIGINAL COMPLETION 04/21/14 ATO/JMD ADFE2FS(04/18/14) WELL: N-26 02/28/01 SIS-SLT COW ERTEDTOCAW AS PERMTNo: 1940750 03/06/01 SIS-LG FNAL API Nb: 50-029-22483-00 10/07/01 RNTTP CORRECTIONS SEC 8,T11 N,R13E 2250'FSL&570'FWL 09/18/12 WRR/JM3 GLV GO(09/12/12) BP Exploration(Alaska) Pm tg4O7�� Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [ AKDCWelllntegrityCoordinator ©bp.com] Re 1 l(Zcrt - Sent: Thursday, September 20, 2012 8:50 PM To: Schwartz, Guy L (DOA); Regg, James B (DOA); AK, OPS GC2 OSM; AK, OPS GC2 Field O &M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad MN; Phillips, Patti J Cc: AK, D &C Well Integrity Coordinator; Walker, Greg (D &C); Clingingsmith, Mike J Subject: OPERABLE: Producer N -26 (PTD #1-7-603490) Tubing Integrity Restored t 6 75u AI I, Producer N -26 (PTD #1940750) passed a TIFL on 09/20/2012 after changing out an orifice gas lift valve. The passing test confirms tubing integrity has been restored. The well has been reclassified as Operable. Please call if you have any questions. Thank you, Gerald Murphy SCANNED iAY 0 `i 2093 BP Alaska - Well Integrity Coordinator WIC Office: 907.659.5102 WIC Email: AKDCWeIIIntegrityCoordinator (a)BP.com From: AK, D &C Well Integrity Coordinator Sent: Monday, September 10, 2012 6:35 PM To: 'Schwartz, Guy L (DOA)'; 'Regg, James B (DOA)'; AK, OPS GC2 OSM; AK, OPS GC2 F' d O &M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D &C W- Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, • S GPB East Wells Opt Engr; AK, OPS Well Pad MN; Phillips, Patti 3 Cc: Arend, Jon (NORTHERN SOLUTIONS LLC); AK, D &C DHD Well Integrity - gineer Subject: UNDER EVALUATION: Producer N -26 (PTD #1760300) Sustain:. Casing Pressure on IA Above MOASP All, Producer N -26 (PTD # 1940750) has confirmed sustained 1 casing pressure above MOASP. The wellhead pressures were tubing /IA/OA equal to SSV /2080/100 on 09/07/201 A TIFL failed on 09/09/2012. The well has been reclassified as Under Evaluation. Plan forward: 1. Slickline: Change out screened orific- gas lift valve. 2. DHD: Re -TIFL 3. WIE: Pending re -TIFL res s, evaluate changing out gas lift valves and performing MIT -IA 1 • fii3c,t,u pit r14 o Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [ AKDCWeIIIntegrityCoordinator @bp.com] � Sent: Monday, September 10, 2012 6:35 PM To: Schwartz, Guy L (DOA); Regg, James B (DOA); AK, OPS GC2 OSM; AK, OPS GC2 Field O &M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; AK, OPS Well Pad MN; Phillips, Patti J Cc: Arend, Jon (NORTHERN SOLUTIONS LLC); AK, D &C DHD Well Integrity Engineer Subject: UNDER EVALUATION: Producer N -26 (PTD #1760300) Sustained Casing Pressure on IA Above MOASP Attachments: N -26 TIO Plot 09- 10- 2012.docx; N- 26.pdf All, f Producer N -26 (PTD # 1940750) has confirmed sustained IA casing pressure above MOASP. The wellhead pressures were tubing /IA/OA equal to SSV/2080/100 on 09/0772012. A TIFL failed on 09/09/2012. The well has been reclassified as Under Evaluation. Plan forward: 1. Slickline: Change out screened orifice gas lift valve. SCANNED mAY 2. DHD: Re -TIFL 3. WIE: Pending re -TIFL results, evaluate changing out gas lift valves and performing MIT -IA A TIO plot and wellbore schematic have been included for reference. J�- SC «N -26 TIO Plot 09- 10- 2012.docx» «N- 26.pdf» 5CP 20b6 Please call if you have any questions or concerns. Thank you, t1 i P = 3e1 z � Mehreen Vazir BP Alaska - Well Integrity Coordinator WIC Office: 907.659.5102 WIC Email: AKDCWeiiIntegrityCoordinator PBP.com Direct Cell: 832.651.5253 Direct Email: Mehreen.VazirPBP.com 1 PBU N -26 PTD #1940750 9/10/2012 TIO Pressures Plot Well: MI6 4.000 - • 3.000 - - — Tbg IA 2 COO - t r ' —a— OA DOA t OOOA On t,G00 - i • 061E12 0612312 063.12 07'0717 871:412 0 072 13,12 00w'Oe 12 03!1 0010112 0&25,12 09;0112 05+0812 i TREE = 4" CIW • WELLHEAD = 13-5/8" FMC SAF NOTES: CHROM E TBG AND CSG ACTUATOR BAKER KB. ELEV ' 73.9' BF. ELEV = 43.4' K_OP = 1304' u Max Angle = 45 @ 5833' 2090' I- 14-1/2" OTIS HXO SSSV NIP, ID = 3.813" Datum MD = 10450' ilbr Datum TVD = 8800' SS 110 -3/4" CSG, 45.5 #, L -80, ID = 9.953" I-I 3410' I---A ` _ GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 5 3341 2953 39 OTIS BK 4 5969 4935 44 OTIS BK Minimum ID = 3.725" @ 10084' 3 8235 6702 25 OTIS BK 2 9797 8157 11 OTIS BK 4 -1/2" OTIS XN NIPPLE 1 9943 8301 11 OTIS BK 7 -5/8" CSG, 29.7 #, L -80, ID = 9.953" H 9898' 1.•••••• I I 9971' H4-1/2" OTIS X NIP, ID = 3.813" I Z ►:� 10036' -- 17 -518" X 4 -1/2" TW HBBP PKR, ID = 3.93" I I I 10067' 1-14-1/2" OTIS X NIP, ID = 3.813" 1 I I 10084' 1-14 -112" OTIS XN NIP, ID = 3.725" I 4 -1/2" TBG, 12.6 #, 13 -CR, .0152 bpf, ID = 3.958" I-I 10095' I 10095' --I4 -1/2" WLEG. ID = 3.958" PERFORATION SUMMARY 10093' H ELMD TT LOGGED 08/03/94 I REF LOG: TIE IN LOG /BHCS ON 07/23/94 ANGLE AT TOP PERF: 10 @ 10264' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE 3 -3/8" 6 10264 - 10294 0 08/30/95 I 3 -3/8" 4 10264 - 10268 S 06/04/95 3 -3/8" 6 10264 - 10268 S 06/04/95 I 3 -3/8" 6 10264 - 10268 0 06/08/95 2- 9/16" 4 10264 - 10268 0 06/19/95 3 -3/8" 4 10272 - 10286 S 06/04/95 3 -3/8" 6 10272 - 10286 S 06/04/95 3 -3/8" 6 10272 - 10286 0 06/08/95 2- 9/16" 4 10272 - 10286 0 06/19/95 I 3 -3/8" 6 10330 - 10350 S 06/04/95 PBTD I 10734' vy T- - .1 ♦!1!111!!1 1 7 -58" CSG, 29.7 #, 13 -CR 80, ID = 6.875" H 10810' 11 • ∎ A. • A / A 1 A 1 M P= 6660 fs; DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 07/27/94 ORIGINAL COMPLETION WELL: N-26 02/28/01 SIS -SLT CONVERTED TO CANVAS PERMIT No: 194 -0750 03/06/01 SIS -LG FINAL API No. 50- 029 - 22483 -00 10/07/01 RN /TP CORRECTIONS SEC 8, T11 N, R13E BP Exploration (Alaska) A • iu- 4 1946760 Regg, James B (DOA) From: AK, D &C Well Integrity Coordinator [ AKDCWeIIIntegrityCoordinator @bp.com] C G /�� / t Sent: Sunday, June 10, 2012 7:35 PM l 1 To: AK, D &C Well Integrity Coordinator; Regg, James B (DOA); Schwartz, Guy L (DOA); AK, D &C Well Services Operations Team Lead; AK, D &C Wireline Operations Team Lead; Cismoski, Doug A; Daniel, Ryan; AK, RES GPB West Wells Opt Engr; AK, OPS GC2 Field O &M TL; AK, OPS GC2 OSM; AK, OPS GC2 Wellpad Lead; AK, OPS Well Pad MN; Phillips, Patti J Cc: AK, D &C DHD Well Integrity Engineer; Arend, Jon (NORTHERN SOLUTIONS LLC); Wills, Shane M; LeBaron, Michael J; King, Whitney Subject: UNDER EVALUATION: N -13 (PTD #1810130) and N -26 (PTD #1940750) GC2 TAR complete, Wells to be Brought Online to Evaluate TxIA Communication All, Producers N -13 (PTD #1810130) and N -26 (PTD #1940750) were found to have sustained casing pressure on the IA during the GC2 shut down for turnaround. The GC2 turnaround is complete. These wells are ready to be brought online in order to perform a TIFL to evaluate for TxIA communication. In the event the TIFLs fail, a follow -up email will be sent out with a detailed plan forward. These wells are reclassified as Under Evaluation. Please call if you have any questions. Thank you, Whitney King filling in for Gerald Murphy (alt. Mehreen Vazir) 4teli4NED JUL 8 201 t-‘ ) Well Integrity Coordinator Office (907) 659 -5102 Cell (907) 752 -0755 Pager (907) 659 -510() Ext. 1154 From: AK, D &C Well Integrity Coordinator Sent: Sunday, May 27, 2012 5:40 PM To: 'Regg, James B (DOA)'; 'Schwartz, Guy (DOA)'; AK, D &C Well Services Oper. tons Team Lead; AK, D &C Wireline Operations Team Lead; Cismoski, Doug A; Daniel, Ryan; AK, RES GPB West W- s Opt Engr; AK, OPS GC2 Field O &M TL; AK, OPS GC2 OSM; AK, OPS GC2 Wellpad Lead; AK, OPS Well Pad MN; Phil 'es, Patti 3 Cc: Walker, Greg (D &C); Olson, Andrew; AK, D &C DHD Well Integrity E .sneer Subject: NOT OPERABLE: Producers with Sustained Casing Pressure • IA During GC2 TAR Shut Down All, The following producers were found to have sustained casi • pressure on the IA during the shut down for turnaround activity. The immediate action is to perform a TIFL on ea. of the wells to evaluate for IA repressurization. If any of the wells fail the TIFL, a follow up email will be sent to the •GCC for each individual well with a plan forward. N -13 (PTD #1810130) N -26 (PTD #1940750) All the wells listed above are reclassified a- Not Operable until start-up operations commence and are stable. After start- up, the wells will be reclassified as Under valuation with POP parameters to prevent any over - pressure incidents. Please call with any questions or cone= rns. 1 N-26 (PTD #1940750) UNDER EV IÞVVATION - Sustained Casing pressu.n IA Regg, James B (DOA) Page 1 of 1 NSU, ADWWelllntegrity Engineer [NSUADWWelllntegrityEngineer@BP.com] Saturday, September 15,20078:19 AM Regg, James B (DOA); Maunder, Thomas E (DOA); Fleckenstein, Robert J (DOA); Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Area Mgr West (GC2/WRD); GPB, GC2 Wellpad Lead; GPB, GC2 OTL; GPB, Optimization Engr; GPB, Wells Opt Eng; GPB, Prod Controllers; Warren, Mike Cc: Roschinger, Torin 1.; NSU, ADWWelllntegrity Engineer; Holt, Ryan P (ASRC) Subject: N-26 (PTD #1940750) UNDER EVALUUATION - Sustained Casing Pressure on IA Attachments: N-26.pdf ~.ft 1(zh/ð1 From: Sent: To: All, Well N-26 (PTD #1940750) has been found to have sustained casing pressure on the IA. The wellhead pressures were SSV/2060/0 psi on 09/12/07. A subsequent TIFL failed later on 09/14/07. The well has been classified as Under Evaluation and may be produced under a 28-day clock. «N-26.pdf» The plan forward for this well is as follows: 1. D: TIFL - FAILED 2. S: Change out S/O in STA # 1 4. D: Re-TIFL J4.. Z()60 r7.' 3D ~ .vtJ{ f / Ó(- 40 á>fòcv-k- pe;. C'.o 4-q Z- A wellbore schematic has been included for reference. Please call with any questions or concerns. Thank you, Paul Austin for Andrea Hughes Well/ntegrity Coordinator GPB Wells Group Phone: (907) 659-5102 Pager: (907) 659-5100 x1154 . 'cn SEP 2 B 2001 5GANN~ 9/26/2007 . . TREE = WELLHEAD = A CTUII. TOR = KB. ELEV = BF ELEV 4"CIW 13-518" FMC BAKER 73.9' 4 N-26 SAFErY NOTES: CHROME TBG AN> CSG = 3.4 KOP= 1304' Max Angle = 45 @ 5833' 2090' 4-1/2" OTIS HXO SSSV NIP, ID= 3.813" DatumMD= 10450' . Datu m ND - 8800' SS 1----4 ~ GAS LIFT MANDRELS 10-3/4" CSG, 45.5#, L-80, ID = 9.953" 3410' ST MD TVD DEV TYPE VLV LATCH FORI' DATE 5 3341 2953 39 OTIS BK 4 5969 4935 44 OTIS BK Minimum ID = 3.725" @ 10084' L 3 8235 6702 25 OTIS BK 2 9797 8157 11 OTIS BK 4-112" OTIS XN NIPPLE 1 9943 8301 11 OTIS BK , II 17-518" CSG, 29.7#, L-80, ID= 9.953" 9898' . 9971' 4-1/2" OTIS X NIP, ID= 3.813" I 8 rv 10036' 7 -5/8" X 4-1/2" TIW HBBP PKR, ID = 3.93" I "'-" 10067' 4-1/2" OTIS X NIP, ID= 3.813" I . 10084' 4-1/2" OTIS XN NIP, ID = 3.725" I 4-1/2" TBG, 12,6#, 13-CR, .0152 bpf, ID = 3.958" 10095' I 10095' 4-1/2"WLEG, ID= 3.958" I I 10093' H ELMD TT LOGGED 08/03/94 I PERFORATION SUMIlAARY REF LOG: TIE IN LOG'BHCS ON 07/23/94 ANGLEA TTOP PERF: 10@ 10264' Note: Refer to A'oduction DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-318" 10 10264-10268 S 05ß1/95 3-318" 10 10272-10286 S 05ß1/95 3-318" 6 10330-10350 S 05ß1I95 I 3-318" 16 10264-10268 0 06,u 8/95 3-318" 10 10272-10286 0 06,u 8/95 3-318" 6 10269-10294 0 08ßO/95 ] I I PBTD 10734' 17-518" CSG, 29.7#, 13-CR 80, ID = 6.875" I 10810' I ~g DATE 07/27/94 02128/01 03106101 1 0/07/01 REV BY COMMENTS ORlGIN6.L COMPLETION S5-SL T CONVERTED TO CANV AS SIS-LG FIN6.L RN/TP CORRECTIONS DATE REV BY COMMENTS PRUDHOE BAY UNIT WELL: N- 26 PERMIT No: 194-0750 API No: 50-029-22483-00 SEC 8, T11 N, R13E BP Exploration (Alaska) ~ -- ~ ~ $ BEElq oN og ,AO,3CC Ind~¥ v~idua i 6eo'i oq'¥ca i Mater'~'a'i s Inw-antor'y Date; 06/08/96 PERiqlT DATA T DATA_F Lbo RUN DAT'E.....RDCVD 9a"'-075 ~D~L/SFI.~/'GR L 6540-.7500 1 09/09/9a 94--075 ~'..1/(?NT6 L 6540--7500 i 09/09/9~ 94,,,-075 ~/CCL L '10160-~ 103'70 '1 07/:?0/95 9a-'"075 ~CCi L 10200,'.-i04,50 1 0;~/':}0//95 94.-075 ' ~T/t'-~Nca~ L 6590--.-'~490 1 09/09/"94 94-~-075 ~.I(-.-100 L 9420---9959 I 08/'~5/9a. 9a-~'075 ~'DK .....IO0/GRG/CCL L I0120'~I0680 '/ 06/01/95 9a.-.-,075 ~C/GR/CCL L 9900-- 10300 1 08/i 5,/"9~ 94-075 PFCj'GR/CC L L 9500--9735 i ~.~ o'"/" 25/94 9a.-.-075 ~C/"PERF L. 10150,-. 10421 1 06/'16/'95 9/.~,'-, 0'/5 ¢'LS/FZNAL L 10i50--I0656 1 05/'12/95 .. 9a -,-075 ~RO/'L ZTt--IO, L 6590-7490 1 09/09/'9/~ Ar'e dr'y d'¥tch samples r'equ~'r'eci? ~/as the ~,/e'i 'i ..... co~ ,~d;, yes Anal ys~'s & descr"¥pt'fon r'ec~sd'" Ar'e we'i 'i tests r'equ~'r'ed? yes e~'ved~yes no '¢/e i 'i -'¥ s ~' n comp'i I n '¥ t i' a 'l C O~IM E N T S LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 14 May 1996 Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL DESCRIPTION i LDWG TAPE+LiS 7~_-~L B-12 (43-31-1-14)~1~- 1 LDWG TAPE+LIS N-26 (21-7-11-13) ]~E~))~[~ 1 LDWG TAPE+LIS Run F 1 Run # 1 Run # 1 ECC No. 5666.04 5791.09 6245.08 Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street Suite 201 Anchorage, AK 99518 ~a O~ & G~ Cons. c~mm~ ~c~omse LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 25 April 1996 RE: ............ al or Da~a Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as ~=~ibed below: W~LL = ~ DESCRiPTiON 7~o ~ ~) N-07 1 CN FINAL BL+RF 7~,~% B-12 (43-31-1-14) ~9 - ~7~N-09 qg, ~75' N-26 (21-7-11-13) ECC No. Run ~ 1 3077.01 1 CN FINAL BL+RF ~/ Run # 1 5666.04 1 CN FINAL BL+RF - Run ~ 1 5791.09 1 CN FINAL BL+RF Run # 1 6053.01 1 CN FINAL BL+RF Run # 1 6245.08 Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street Suite 201 Received by: Anchorage, AK 99518 ! /(/ ,,' - ~,, , :,:,.L..~ ,'~ / // / ' ...... '"',~--~-';; Dace: LARRY GRANT ~ Date: 22 June 1995' 3001 PORCUPINE DRI~ RE: Transmittal of Data ~, 99501. ~ ~5~ Dear S ir / Ma d ~ , ,.~%~ ~ % ~%%%u Enclosed, please find the data as described below: 01 ~26 (21-7-11-13) H-08 (4/-1/6-11~13) 1 PFC/PERF FINAL BL+RF Run # 1 4990.03 K-14 1 PFC/PERF FINAL BL+RF Run # 1 6245.06 1 CN/GR FINAL BL+RF Run # 1 6447.01 Please sign,and return to: Attn. Rodn~~ Atlas Withe Service/ //7Anchorage, AK 99518 - _ /J Or F~ to (907) 563-7803 LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 11 September 1995 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, .. · ~. .. Enclosed, please find the data as described below: . .:~:'~'.i .~ '" 7-----'- -~-1- ~'~e'~-~'~'~'~'''~' ..... - '.:~=V ....... N-04A (42-8-11-13) ~ ' I CN/GR FIN~ BL+~ ~'- Run ~ 1 "' . 2373.03 N-01 (13-08-11--13) "-::-: 1 CN/GR FIN~ BL+~ ~--.~-'=Run ~ I "~-~ ...... 4060.04 . ~ B-06 (41-31-11-14) ' 1 CN/GR FIN~ BL+~ Run ~ 1 ..... "-4475.06 N-16 (11-17-11-13) .. W-31 (31-17-11-12) Z-18 1 CN/GR FINAL BL+RF Run ~ 1 . "'~912.04 1 CN/GR FINAL BL+RF Run ~ i 5659.04 ' - ....... . 1 PLS FINAL BL+RF Run ~ 1 5779.04 Z-15 I PLS FINAL BL+RF Run # 1 -. 6026.03 I PFC/PERF FINAL BL+RF Run # 1 6245.07 Y-11L1 1 GR/CCL FINAL BL+RF Run # 1 6476.00 . . . . Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 13 June 1995 Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL B-31 (44-31-11-14) 77/~-O J-06 (04-11-13) ~__~ W-35 (12-21-11-12) DESCRIPTION I GR/CCL FINAL BL+RF 1PFC/PERF FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PFC/PERF FINAL BL+RF Run # 1 Run # 1 Run # 1 Run # 1 ECC No. 5830.03 6031.05 6245.05 6251.03 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: Please sign and ~eturn.~; PetrotecDmical Data Center BP Exploration (Alaska) 900 East Benson Boulevard - iq , i ' -- -17-1 Alaska Oil & Gas Cons, omsLsszon- Da~e Anchorage LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 2 June 1995 Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL B-17 (43'25-11-13) DESCRIPTION 1 LDWG TAPE + LIS 1 LDWG TAPE + LIS Run # 1 Run # 1 ECC No. 992 11 6245.04 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: Petrotecbnteal Data Cente~ ~p ~xploration (~asMa) I~ ~ EaSt BensOn ~ . · . ~skB Oil & Gas G~s. LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 23 May 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: .~B_LL ~ ~/~ 17 (43-25-11-13) ~/~ N-13 (42-07-11-13) DESCRIPTION 1 PDK/GR FINAL BL+RF ECC No. 1 PLS FINAL BL+RF Run # 1 992.11 Run # 1 2189.03 1 CCL FINAL BL+RF Run # 1 5757.03 ! PDK/GR FINAL BL+RF 1 PFC/PERF FINAL BL+RF Run # 1 6245.04 Run # 1 6431.02 Please sign and return to: Attn.~Rodney D. Pau~n Atlas ~reline S~W~ices '~ 56oo B s et Suite 201 LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 8 May 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION 1 PLS FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PLS FINAL BL+RF ECC No. Run # 1 1546.03 Run # 1 3820.04 Run # 1 4966.03 Run # 1 4979.05 Run # 1 5633.04 Run # 1 5751.06 Run # 1 6245.03 Please sign and retUrn to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street . Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: Please sign and, ~.eturn Pet~otechnieal, Data Cents: SP Exploration (Alaska) 900 E~t Benson Boulevard ~oh ka ' R~ei~ed b~ MAY 1 2 1995 Alaska .Oil. ~ B.as.Co~s..Commlsslon Anchorage LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 21 March 1995 Transmittal of Data Sent by: ANCH.EXPRES Dear Sir/Madam, Enclosed, please find the data as described below: WELL x-0 -02 (32-11-14) DESCRIPTION GR/CCL FINAL BL+RF GR/CCL FINAL BL+RF GR/CCL FINAL BL + RF PFC/PERF FNL BL+RF PLS FINAL BL+RF GR/CCL FINAL BL+RF Run # 1 Run # 1 Run ~ 1 Run # 1 Run ~ 1 Run # 1 ECC No. 3982.03 5787.09 5801.07 5803.11 5830.01' 6245.02 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by:, Date: Please s igu% and Petrotechnica! Data Cente~;' BP E"/~~-.. :,. .:_~'~ ~ ~ ~~- ,_ ~ ,. ~.~~. ,, 900 ~Q~- ~'~ ~ Oil & Gas Cons, Commi~ion Anchorage ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 16 August 1994 RE: Transmittal of Data Sent by: ANCHORAGE EXPRS Dear Sir/Madam, Enclosed, please find the data as described below: LL ~ DESCRIPTION -25 (33-7-11-13) 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA 1 PDK/GR/CCL FINAL BL 1 PDK/GR/CCL RF SEPIA 1 PL LEAKDET. FINAL BL 1 PL LEAKDET. RF SEPIA 1 PL/GASENTRY FINAL BL 1 PL/GASENTRY RF SEPIA 1 PLS FINAL BL 1 PLS FINAL RF SEPIA 1 PLS FINAL BL 1 PLS FINAL RF SEPIA 1 PLS/GLM FINAL BL 1 PLS/GLM RF SEPIA 1 PLS FINAL BL 1 PLS FINAL RF SEPIA 1 CN/GR FINAL BL 1 CN/GR FINAL RF SEPIA ECC No. Run # 1 6238.04 Run # 1 Run # 1 Run # 1 6238.03 Run # 1 3889.06 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 3576.01 2441.03 Run # 1 6041.03 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 5708.06 3170.03 5768.02 ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 10 August 1994 RE:. Transmittal of Data ,. Sent by: ANCHORAGE EXPRS Dear Sir/Madam, Enclosed, please find the data as described below: WELL J-09 N-26 (21-7-11-13) '~ ~ °O~'B-7 DESCRIPTION 1 CCL/TUBCUTR FINAL BL I CCL/TUBCUTR RF SEPIA 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA 1 PL/SPNR FINAL BL 1 PL/SPNR RF SEPIA B-16 (21-32-11-14) 1 PL/SPNR FINAL BL 1 PL/SPNR RF SEPIA R-21 1 PLS STATIC FINAL BL i PLS STATIC RF SEPIA W-25 (14-16-11-12) Z-28 1 PLS BASKET FINAL BL 1 PLS BASKET RF SEPIA 1 PLS SPNR FINAL BL 1 PLS SPNR RF SEPIA 1 PLS SPNR FINAL BL 1 PLS SPNR RF SEPIA Cont/ Please sign and return ~o: Petrotechnical Data Center BP Exploration (Alaska) Ino 900 East Benson Boulevard Anchorage, Alask~ 99508 Received by Date ECC No. Run ~ 1 6247.01 Run # 1 Run # 1 6245.01 Run # 1 Run ~ 1 6233.01 Run $ 1 Run ~ 1 5784.06 Run # 1 Run ~ 1 4041.01 Run # 1 Run ~ 1 4952.02 Run ~ 1 Run ~ 1 4323.01 Run $ 1 Run # 1 6162.02 Run $ 1 Run # 1 Run $ 1 5636.04 STATE OF ALASKA -il ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] ~ [] ,ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number BP Exploration 94- 75 3. Address 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22483 4. Location of well at surface '1 LOC. AT|~ 9. Unit or Lease Name 2253' NSL, 4709' WEL, SEC. 8, T11N, R13E ~ COM~L~TJ0N N-26 (21-7-11-13) 391' SNL, 3475' WEL, SEC. 7, T11N, R13E ~ VF.~,,IFI~ED I 11. Field and Pool At Total Depth i Prudhoe Bay Field/Prudhoe Bay Pool 5. Elevation in feet (indicate KB, DF, etc.) ~. Lease Designation and Serial No. KBE = 73.9' I ADL 28282 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions 7/10/94 7/23/94 8/3/94I N/A feet MSL I One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 120. Depth where SSSV set j21. Thickness of Permafrost 10820' MD/9239' TVD 10734' MD/9154' TVD YES [] NO []I 2087'feet MD' ! 1900' (Approx.) 22. Type Electric or Other Logs Run GR/AC/DIL/CNL/FMT 23. CASING, LINER AND CEMENTING RECORD SETrlNG DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PUl LFD 20" 91.5# H-40 30' 110' 30" 260 sx Arcticset (Approx.) 10-3/4" 45.5# NT-80 30' 3410' 13-1/2" 1100 sx CS 11/375 sx "G" 7-5/8" 29. 7# NT-95/13CR 27' 10810' 9-7/8" 587 sx Class "G" 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET(MDI Gun Diameter 3-3/8" 4 spf MD TVD 4-1/2", 13CR80 10095' 10031' 10264'- 10268' 8690'-8694' 10272'- 10286' 8698'-8712' 26. ACID, FRACTURE, CEMENT SQUEEZE, ET,~. DEPTH ~NTERVAL (MD) AMOUNT & K[I~(~,A~JkL USED Date8/4/94First Production IIMeth°dGas Lift°f Operation (Flowing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR OIL-BBL ~AS-MCF WATER-BBL C HOKESIZE IGAS-OIL RATIO I TEST PERIOD Flow Tubing Casing Pressure 3ALCULATED OIL-BBL GAS-MCF ~/ATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. ORIGINAL Form 10-407 Submil in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 30. !ORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Subsea Sag River 10149' 8503' Shublik 10186' 8540' Top Sadlerochit 10260' 8613' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge ~ do~cll~J~- Signed ~ -~J/'.-/J / - Title Dr/fling EnaineerSuoerv isor Date ~'~[""~[~ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: N-26 BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 07/10/94 09:00 SPUD: RELEASE: OPERATION: DRLG RIG: NABORS 18E WO/C RIG: NABORS 18E 07/11/94 ( 1) TD: 840' ( 0) 07/12/94 (2) TD: 2000' (1160) 07/13/94 (3) TD: 3422' (1422) 07/14/94 ( 4) TD: 3422' ( 0) DRILLING MW: 8.8 VIS:316 MOVE MODULES TO N-26 AND SPOT SAME. TAKE ON WATER. NU 20" DIVERTER SYSTEM, HYDRILL, MIX SPUD MUD. CIRCULATE MUD SYSTEM CHECK FOR LEAKS. PU 13 1/2" BHA, STRAP, CHANGE MOTOR ANGLE, ORIENT, SURFACE CHECKS ON MWD/MOTOR. SPUD WELL @1900 HRS 07/10/94. DRILLING F/ 108-840'. NO PROBLEMS. DRILLING MW: 9.1 VIS:180 DRILLING F/ 840-888' SHORT TRIP T/ DC'S, BRIDGE AT 790' REAM BRIDGE 790-888' DRILLING F/ 888-1813'. POH, TIGHT F/ 1708' BOULDER ALONGSIDE BHA. NO SWABBING, FREE WORKING ~OWN. WORK PIPE OUT W/ PUMP/ROTATING. XO BITS. CLEAR FLOOR. RIH, HIT BRIDGE @1620'. REAM F/ 1620-1813' DRILLING F/ 1813-2000' SHORT TRIP - TIGHT @2758' MW: 9.6 VIS:223 DRILLING F/ 2000-2338'. POP-OFF VALVE AND SEAT WASHED #2 PUMP, XO. DRILLING F/ 2338-3422'. CBU. SHORT TRIP, HOLE TIGHT @2143' PU KELLY, WORK TIGHT HOLE, PUMP SINGLES OUT. POH TO HWDP SLM, NO CORR RIH, HIT BRIDGE @1967' REAM F/ 1967-2280'. RIH, TIGHT ~/ 2280-2650', RIM T/ 342~' CIRC/COND MI/D, PUMP SWEEP AROUND. SHORT TRIP F/ 3422-2758'. HOLE TIGHT. PICK UP KELLY AND WORK OUT OF HOLE. MOSTLY SMALL PEA GRAVEL OVER SHAKER. VIS UP F/ HOLE CLEANING. POOH MW: 9.7 VIS:350 SHORT TRIP-HOLE TIGHT @2760. PUMP OUT & LD 24 SINGLES T/1800'. RIH BRIDGE @2550 LD 4 JTS. WASH/REAM TIGHT HOLE F/2541 T/3422. CBU. SHORT TRIP-HOLE TIGHT @3222. PUMP 28 JTS DP T/2440. HOLE PACKED OFF. DP STUCK W/BIT @2440. WORK STUCK PIPE JAR UP/DOWN. NO LUCK. PU 7.75" SURFACE JARS JAR 3' IN 1.25 HRS-DP STARTED MOVING DOWN. PU KELLY/ROTATE - BROKE CIRC. CIRC/COND MUD RAISING WT T/10.1 PPG/VIS T/400+. DP MOVING FREE. CIRC SAND & GRAVEL. POOH WELL : N-26 OPERATION: RIG : NABORS 18E PAGE: 2 07/15/94 ( 5) TD: 3422'( 0) 07/16/94 ( 6) TD: 3422' ( 0) 07/17/94 ( 7) TD: 5551' (2129) 07/18/94 ( 8) TD: 6750' (1199) RUNNNG 10 3/4" CASING MW:10.3 VIS: 0 PUMP OUT AND LD 3 JTS DP W/ KELLY. POH AND LD MWD MOTOR AND NM DC'S. BOTTOM TWO STABILIZERS BALLED UP. HOLE IN GOOD SHAPE F/ 2350' TO SURFACE. PU 13 1/2" BHA AND RIH. FILL DP @2400' TAGGED UP AT 2425'. WASH AND REAM F/ 2425-3422' HOLE TIGHT AND SOME PACKING OFF F/ 2850-3422'. CIRC OUT S~ND. CIRC HOLE CLEAN AND COND MUD. CIRC OUT A LOT OF SAND. MADE 20 XX STAND SHORT TRIP TO 1494' HOLE TIGHT. PUMPED OUT 7 JTS DP F/ 3422-3184' HOLE IN GOOD SHAPE F/ 3184-1494'. RIH TO 3150'. WASHED AND REAMED 8 JTS DP TO BTM. HOLE TIGHT F/ 3350-3422'. CIR AND COND MUD. PUMPED 4 JTS DP OUT - RIH - WASHED 40' TO BOTTOM. CIRC AND COND MUD. POH TO RUN 10 3/4" CSG. PUMPED FIRST 3 JTS OUT, HOLE IN GOOD SHAPE EXCEPT FOR BTM 50' 3372-3422'. RU CASING TOOLS. RUN 10 3/4" SURFACE CASING. PU BHA MW: 9.3 VIS: 36 FINISHED RIH W/ TOTAL 85 JTSS 10 3/4" 45.5# NT-80 CSG. CSG STOPPED @3336'. WASHED AND SPUDDED CSG TO BTMM F/ 3336-341-' CIRC AND COND MUD AND HOLE FOR CMT JOB. NO MUD LOSS. TEST LINES. SET AND CMT'D 10 3/4" CSG W/ SHOE @3410' AND FC @3327'. RAN 1" TO 110' BJ DID TOP JOB PUMPING 108 SX COLD SET 2. CURC. CMT TO SURFACE. UNABLE TO BACK OUT LANDING JT. CUT OFF LANDING JT. ND DIVERTER. CUT RUNNING TOOL OUT OF HANGER AND DRESS UP. NU 13 5/8" 5K SSH. SET BOPS. TEST BRADEN HEAD TO 1000 PSI. INSTALLED TEST PLUG. RU TEST EQUIPMENT. TEST CHOKE MANIFOLD, CHOKE AND KILL LINE VALVES, FLOOR VALVES AND BTM RAMS. TEST HYDRIL. PULLED TEST PLUG AND SET LONG WEAR BUSHING. DRILLING MW: 9.4 VIS: 47 PU 9 7/8" BHA. ORIENT MOTOR/MWD, SURFACE CHECK TOOL. RIH W/ HWDP. CUT DRLG LINE AND SERVICE RIG. RIH TO 3300', CIRC. TEST 10 3/4" CSG. DRLG PLUGS, FC @3327', GOOD CMT, SHOE @3410', AND 10' NEW HOLE TO 3432'. CIRC BTTMS UP AND COND MUD. DRLG 9 7/8" HOLE F/ 3432-4445'. CIRC. MADE 11 STD SHORT TRIP TO 10 3/4" SHOE. NO PROBLEMS. DRLG 9 7/8" HOLE F/ 4445-5459' SHORT TRIP TO 4400' HOLE TIGHT AND SWABBING F/ 15150-%450' WIPE EACH STAND. DRLG F/ 5459-5551'. DRILLING MW: 9.4 VIS: 46 DRLG 9 7/8" HOLE F/ 5551-6474' MAKE 11 STD SHORT TRIP. HOLE IN GOOD SHAPE. DRLG F/ 6474-6641' PUMP PRESSURE ERRATIC. CBU. DROP SURVEY, SLUG DP. POH. LD MOTOR, MWD, AND NMLC. CENTER JET LLSE IN BIT. SERVICE WEAR RING. PU BIT #4, MOTOR AND MWD. ORIENT TOOLS. SURFACE CHECK MOTOR AND MWD. RIH, NO FILL. DRLG F/ 6641-6750'. WELL : N-26 OPERATION: RIG : NABORS 18E PAGE: 3 07/19/94 ( 9) TD: 8400' (1650) 07/20/94 (10) TD: 9200' ( 800) 07/21/94 (11) TD:10200' (1000) 07/22/94 (12) TD:10461' ( 261) 07/23/94 (13) TD:10820' ( 359) 07/24/94 (14) TD:10820' ( 0) DRILLING MW: 9.8 VIS: 51 DRLG F/6750 T/7515. UNI-BOLT CONNECTION ON MUD LINE WASHED OUT. SHORT TRIP 45 STNDS T/10.75" SHOE. HOLE TIGHT & SWABBING F/7300 T/6600. WELD UP MUD LINE. PRESS UP T/3500. RIH T/7515. OK. DRLG 9-7/8" HOLE F/7515 T/8400. DRILLING MW:10.0 VIS: 49 DRLG F/ 8400-8542'. CIRC FOR SHORT TRIP. MADE 10 STD SHORT TRIP. HOLE TIGHT AND SOME SWABBING F/ 8200-7800'. DRLG F/ 8542-8954'. CIRC BTTMS UP. POH FOR BIT. CHANGE BIT. CHECK ORIENTATION. SERVICE WEAR RING. RIH. MWD CHECK SHOT @6631' HOLE IN GOOD SHAPE. NO FILL. DRLG F/ 8954-9200'. DRILLING MW: 9.7 VIS: 37 DRILLING F/ 9200-9896' SHORT TRIP F/ 9896-8950' REAMED LAST 30' TO BTTM. DRILLING F/ 9896-10200'. TIH T/CHK BIT/BHA MW: 9.7 VIS: 38 CBU. OBSERVER WELL - STABLE. SHORT TRIP T/9700. CIRC SWEEP-OBSERVE WELL-STABLE. PUMP PILL. POOH SLM. NO CORRECTION. LD BHA. SERV. WEAR BUSHING. PU BHA, BIT #6. RIH. CUT/SLIP DL. RIH FILL PIPE @ SHOE, 7000. RIH T/10119. TIGHT. BREAK CIRC, REAM F/10119 T/ 10200. DRLG F/10200 T/10461. INCREASE TRQ. WORK BIT, NO SUCCESS. QUIT DRLG. CIRC, OBSERVE, WELL STABLE. PUMP DRY JOB POOH. CBU @ TD FOR LOGS MW: 9.7 VIS: 38 POH F/ BIT AND BHA CHECK. SERVICE WEAR RING. RIH, FILL PIPE AT SHOE AND 7000' TRIP SLOWLY. REAM F/ 10400-10461'. DRILLING F/ 10461-10820' SHORT TRIP 7 STDS. RIH F/ CLEAN OUT CONDITION MW: 9.5 VIS: 37 CIRCULATE/CONDITION MUD. PUMP SWEEP SURFACE TO SURFACE. DROP EMS, PUMP PILL. POH F/ LOGS. HOLE GOOD. RU ATLAS. FINISH RU AND RIH, LOGGING RUN #1, GR/DIL/AC/CNL. LOGGER TD 10813'. LOGGING RUN #2, GR/FMT. MADE 26 SETS GOOD DATA RECOVERY. RETRIEVED FLUID SAMPLES. BREAK D~WN TOOLS. RD LOGGERS. PULL WEAR RING, INSTALL TEST PLUG. TEST BOPE. PU BIT #7RR, RIH TO SHOE SLOWLY. PU KELLY, TEST UPPER/LOWER KELLY COCK, FILL PIPE. RIH F/ CLEANOUT AND CONDITIONING HOLE FOR CASING. WELL : N-26 OPERATION: RIG : NABORS 18E PAGE: 4 07/25/94 (15) TD:10820' ( 0) 07/26/94 (16) TD:10820' ( 0) 07/27/94 (17) TD:10820 PB: 9236 07/28/94 (18) TD:10820 PB: 9236 07/29/94 (19) TD: 0 PB: 0 RUN 7 5/8" CSG MW: 9.7 VIS: 42 RIH, FILL PIPE @8000' CIRC/COND MUD, PUMP SWEEP, SPOT 70 BBL PILL ON BOTTOM OF 15 PPB LCM. POH, LD 5" DP, BREAK KELLY, LD BHA, CLEAR FLOOR. REMOVE WEAR RING, INSTALL TEST PLUG, INSTALL 7 5/8" RAMS, BONNET TEST TO 3000 PSI, REMOVE TEST PLUG. RU CASING TOOLS, RUN 7 5/8" 13CR80 / NT95 20.7# NSCC CASING. FILL EVERY 5 JTS INSIDE PIPE EVERY JT BELOW 10 3/4" SHOE. BREAK CIRC AT SHOE AND AT 6600' RUN 4.5" 13CR TBG MW: 8.5 VIS: 28 RIH W/ 23 JTS 7 5/8" 29.7# 13CR80, 250 JTS 7 5/8" 29.7# NT80 NSCC, AND 1 PUP JT NT80 NSCC. TOTAL LENGTH OF 10783.15' LAND AT 10810.30'. CIRC AND COND MUD, RECIPROCATE CSG. RU BJ CMT CASING. TEST LINES/ DROP BTM PLUG, FLUSH LINE WITH BRINE. DROP TOP PLUG. BUMPED PLUG. DRAIN/FLUSH STACK. BACK OUT LANDING JT, INSTALL PACKOFF AND TEST. REMOVE RUNNING TOOL, LD SAME. INJECT DOWN ANNULUS 10 3/4" X 7 5/8", CLEAR FLOOR OF CSG TOOLS. TEST CASING. INJECT TOTAL DOWN ANNULUS OF 306 BBL. XO LOWER RAMS. TEST BONNENT SEALS. REMOVE TEST PLUG. RU AND RUN 4 1/2" 13CR80 12.6# NSCT TUBING COMPLETION ASSEMBLY ON 7 5/8" TIW HBBP PACKER. SET PACKER/TEST 4.5" TBG MW: 8.5 Seawater RIH WITH 4.5" 12.6# 13CR80 NSCT TBG COMPLETION ASSEMBLY. MAKE UP SSSV AND CONTROL LINES. TEST. CONTINUE TO RIH W/ ASSY AND CONTROL LINES. MAKE UP TBG HANGER, STRING WT AS LANDED 95K DOWN 130K UP. RD CAMCO, CLEAR FLOOR OF CSG TOOL, ETC. ND BOPE. NU ADAPTER FLANGE AND TREE, TEST. PULL 2 WAY CHECK THROUGH LUBRICATOR, CIRCULATE SEAWATER W/ CORROSION INHIBITOR DOWN TBG/UP ANNULUS TO CHECK FLUID QUALITY, OK. DROP 1 7/8" BALL AND ROD, SET PKR. RIG RELEASED MW: 8.5 Seawater TEST TUBING. BLEED TUBING PRESSURE. TEST 7 5/8 X 4 1/2". BLEED TUBING AND OBSERVE RP SHEAR. DISPLACE 85 BBLS FREEZE PROTECT DIESEL DOWN ANNULUS. U-TUBE DIESEL FROM ANNULUS TO TUBING, INJECT EXCESS FLUID, CLEAN PITS, SET BPV, SUCK CELLAR AND SECURE WELL. RIG DOWN AND PREPARE TO MOVE OFF N-26. RELEASE RIG @1100 HRS ON 07/27/94. RIG MODIFICATION MW: 8.5 Seawater PREP DERRICK FOR PAINTINF. CONTINUE WITH FROG MODIFICATION. WELL : N-26 OPERATION: RIG : NABORS 18E PAGE: 5 07/30/94 (20) TD: 0 PB: 0 07/31/94 (21) TD: 0 PB: 0 08/01/94 (22) TD: 0 PB: 0 08/02/94 (23) TD: 0 PB: 0 RIG MODIFICATION MW: 8.5 Seawater PREP DERRICK FOR PAINTING. SCRAPE AND CLEAN. ATTACH ALL CONTROLS TO ~1 AND #4 GENERATORS. NEDLE GUN WELDS ON DERRICK AND PREP FOR MAGNIFLUX INSPECTION. CONT WITH FROG MODIFICATION. RIG MODIFICATION MW: 8.5 Seawater CONT PREP DERRICK FOR MAGNIFLUX AND PAINT. PRINE AND PAINT CHUTE, WIND WALLS AND DERRICK. INSTALL REAR JACKING ON PIT COMPLEX. CONT FROG MODIFICATION. RIG MODIFICATION MW: 8.5 Seawater CONT PREP DERRICK OF MAGNIFLUX AND PAINT. COMPLETED MAGNAFLUX OF DERRICK AND A LEGS. NO VISABLE CRACKS. SCRUB AND PAINT SUB, WINDWALLS AND OTHER EXTERIOR AREAS. REMOVE/RESEAL END PLATES ON EL MAGO BRAKE. CONT WITH FROG MODIFICATION. RIG MODIFICATION MW: 8.5 Seawater CONT FROG MODIFICATION. SCRUB AND PAINT SUB STRUCTURE. PAINT DERRICK. PREP SAME TO MOVE. 08/03/94 (24) TD: 0 PB: 0 08/04/94 (25) TD: 0 PB: 0 RIG MODIFICATION MW: 8.5 Seawater CONT FROG MODIFICATION. NEEDLES RUST AND SCALE FROM PITS AND SUB BASE. PRIME AND PAINT SAME. GREASE ALL ROLLERS AND SHEAVES. VERIFY ROTATION OF BRIDLE LINE SHEAVES. INSPECT AND GREASE HYDRAULIC TUGGER LINE SHEAVES. INSPECT SAFETY LINES. RIG MODIFICATION MW: 8.5 Seawater FROG MODIFICATION. PAINT PITS. SCRUB SUB BASE. NEEDLE GUN SUB BASE/PREP FOR PAINTING. PAINT AND SCRUB PITS AND SUB. ESTIMATING RIG MODIFICATIONS AND REPAIR WORK TO BE COMPLETE TADAY AND START TO MOVE TO S-PAD. SIGNATURE: (drilling superintendent) DATE: BP EXPLORAT[ON (Ataska) [nc. Pad N 26 slot #26 Prudhoe Bay North Slope, Alaska SURVEY L [ ST [NG by Baker Hughes [NTEQ Your ref : PMSS <0 - 10123'> : EMS ~10139 - 10820'> Our ref : svy4467 License : Date printed : 25-Jut-94 Date created : 25-Ju[-94 Last revised : 25-Ju[-94 Field is centred on 708179.340,5930615.440,999.00000,N Structure is centred on nTO 18 53.244,w148 54 53.297 Stot location is nTO 19 15.372,w148 54 36.663 Slot Grid coordinates are N 5968154.177, E 634420.581 Slot local coordinates are 2250.00 N 570.00 E Reference North is True North BP EXPLORATION (Alaska) Inc. Pad N,26 Prudhoe Bay,North Slope, Alaska SURVEY LISTING Page 1 Your ref : EMS <10139 - 10820'> Last revised : 25-Ju[-94 Measured Inclin. Azimuth True Vert. R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C 0 0 R D I N A T E S Deg/lOOFt Sect 0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.00 0.00 99.00 0.30 68.00 99.00 0.10 N 0.24 E 0.30 -0.15 198.00 0.10 185.10 198.00 0.11 N 0.47 E 0.36 -0.34 291.00 0.20 218.10 291.00 0.10 S 0.36 E 0.14 -0.36 383.00 0.20 226.60 383.00 0.34 $ 0.15 E 0.03 -0.31 475.00 0.40 244.90 475.00 0.58 S 0.26 W 0.24 -0.10 567.00 0.50 229.00 566.99 0.98 S 0.85 W 0.17 0.18 660.00 0.50 217.10 659.99 1.57 S 1.40 W 0.11 0.32 753.00 0.70 219.50 752.98 2.34 S 2.01 W 0.22 0.41 844.00 0.80 246.60 843.98 3.02 S 2.94 W 0.40 0.82 936.00 2.50 297.90 935.94 2.33 S 5.31 g 2.28 3.17 1028.00 5.10 309.20 1027.73 1.19 N 10.25 W 2.93 9.24 1121.00 6.90 312.00 1120.22 7.54 N 17.61 W 1.96 18.87 1212.00 8.70 312.40 1210.37 15.84 N 26.75 W 1.98 31.06 1304.00 10.20 312.40 1301.12 26.03 N 37.91 W 1.63 45.97 1396.00 12.70 307.80 1391.28 37.72 N 51.91 W 2.89 64.09 1490.00 14.20 306.40 1482.70 50.90 N 69.36 W 1.63 85.90 1582.00 15.70 307.80 1571.59 65.22 N 88.28 g 1.68 109.57 1675.00 18.20 304.60 1660.54 81.18 N 110.18 W 2.87 136.63 1770.00 20.60 303.20 1750.14 98.76 N 136.38 W 2.57 168.18 1862.00 23.60 301.50 1835.37 117.25 N 165.63 W 3.33 202.78 1955.00 24.50 301.50 1920.30 137.05 N 197.95 W 0.97 240.67 2048.00 26.00 302.50 2004.41 158.08 N 231.58 W 1.68 280.33 2141.00 29.40 300.40 2086.74 180.59 N 268.48 W 3.80 323.53 2234.00 31.90 302.90 2166.75 205.50 N 308.80 ~ 3.02 370.91 2324.00 35.60 305.00 2241.57 233.45 N 350.24 W 4.31 420.89 2416.00 36.50 305.00 2315.95 264.50 N 394.59 W 0.98 475.00 2508.00 37.70 302.90 2389.33 295.48 N 440.63 W 1.90 530.48 2601.00 39.20 302.90 2462.16 326.89 N 489.18 W 1.61 588.31 2694.00 40.30 301.80 2533.~ 358.70 N 539.42 ~ 1.40 647.77 2786.00 41.00 303.20 2603.47 390.91 N 589.96 W 1.25 707.70 2878.00 40.80 303.60 2673.00 424.07 N 640.25 W 0.36 767.93 2972.00 40.90 304.60 2744.11 458.54 N 691.16 W 0.70 829.40 3065.00 40.40 304.60 2814.67 492.94 N 741.03 W 0.54 889.97 3158.00 40.20 305.00 2885.60 527.27 N 790.42 W 0.35 950.09 3248.00 39.60 305.00 2954.64 560.38 N 837.71 W 0.67 1007.79 3347.00 38.70 305.30 3031.42 596.36 N 888.82 W 0.93 1070.25 3433.00 38.20 307.40 3098.77 628.05 N 931.89 W 1.62 1123.64 3526.00 37.70 305.70 3172.10 662.11 N 97-/.83 W 1.25 1180.72 3619.00 37.40 304.60 3245.84 694.74 N 1024.17 W 0.79 1237.36 3712.00 37.60 304.60 3319.62 726.89 N 1070.77 W 0.22 1293.96 3804.00 37.90 303.60 3392.36 758.47 N 1117.41 W 0.74 1350.27 3896.00 38.80 303.20 3464.51 789.89 N 1165.06 ~ 1.01 1407.35 3988.00 39.90 305.00 3535.66 822.60 N 1213.36 W 1.72 1465.67 4081.00 40.30 303.20 3606.80 856.17 N 1262.96 W 1.32 1525.56 4174.00 40.20 301.80 3677.78 888.46 N 1313.63 W 0.98 1585.64 4265.00 40.40 301.80 3747.18 919.48 N 1363.66 W 0.22 1644.48 4358.00 40.40 302.20 3818.00 951.42 N 1414.77 g 0.28 1704.75 4453.00 40.70 304.60 3890.19 985.41 N 1466.32 W 1.67 1766.50 4543.00 40.80 303.20 3958.38 1018.18 N 1515.08 W 1.02 1825.24 All data is in feet unless otherwise stated Coordinates from slot #26 and TVD from RKB (73.90 Ft above mean sea level). Vertical section is from wellhead on azimuth 303.09 degrees. Declination is 0.00 degrees, Convergence is 1.02 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ BP EXPLORATION (Alaska) Inc. Pad N,26 Prudhoe Bay, North Slope, Alaska SURVEY LISTING Page 2 Your ref : EMS <10139 - 10820'> Last revised : 25-Ju[-94 Measured Inc[in. Azimuth True Vert. R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C 0 0 R D I N A T E S Deg/lOOFt Sect 4636.00 40.80 303.60 4028.78 1051.63 N 1565.81 W 0.28 1886.00 4726.00 40.80 305.60 4096.91 1085.02 N 1614.22 W 1.45 1944.78 4819.00 40.70 304.30 4167.36 1119.79 N 1663.97 ~ 0.92 2005.46 4910.00 41.30 303.60 4236.04 1153.13 N 1713.50 ~ 0.83 2065.15 5003.00 41.30 304.60 4305.91 1187.54 N 1764.32 W 0.71 2126.52 5096.00 41.10 306.00 4375.89 1222.94 N 1814.31 W 1.01 2187.73 5186.00 41.00 305.70 4443.76 1257.55 N 1862.22 ~ 0.24 2246.76 5279.00 43.20 305.30 4512.76 1293.75 N 1912.98 ~ 2.38 2309.05 5372.00 43.40 305.30 4580.44 1330.61 N 1965.03 ~ 0.22 2372.79 5464.00 43.60 303.90 4647.18 1366.57 N 2017.16 ~ 1.07 2436.09 5555.00 44.00 303.60 4712.86 1401.56 N 2069.53 W 0.50 2499.07 5649.00 44.10 303.60 4780.42 1437.73 N 2123.97 W 0.11 2564.42 5741.00 44.70 304.60 4846.15 1473.82 N 2177.27 ~ 1.00 2628.78 5833.00 44.80 305.00 4911.49 1510.78 N 2230.45 W 0.32 2693.52 5924.00 44.00 302.90 4976.51 1546.34 N 2283.26 ~ 1.84 2757.18 6016.00 44.50 303.20 5042.41 1581.35 N 2337.06 ~ 0.59 2821.37 6110.00 43.60 303.20 5109.97 1617.14 N 2391.75 W 0.96 2886.73 6203.00 43.70 302.20 5177.26 1651.82 N 2445.77 W 0.75 2950.92 6295.00 43.50 302.20 5243.88 1685.63 N 2499.46 ~ 0.22 3014.36 6387.00 42.90 301.80 5310.95 1719.00 N 2552.86 W 0.72 3077.32 6481.00 43.20 300.80 5379.64 1752.34 N 2607.69 W 0.79 3141.46 6574.00 42.50 300.80 5447.82 1784.72 N 2662.02 W 0.75 3204.65 6668.00 41.40 300.10 5517.73 1816.57 N 2716.19 W 1.27 3267.42 6762.00 41.50 300.40 5588.19 1847.92 N 2769.94 W 0.24 3329.57 6855.00 41.30 299.70 5657.95 1878.71 N 2823.17 ~ 0.54 3390.99 6949.00 41.20 300.10 5728.62 1909.61 N 2876.90 ~ 0.30 3452.87 7042.00 41.10 300.40 5798.65 1940.44 N 2929.76 ~ 0.24 3513.99 7138.00 41.10 300.40 5870.99 1972.37 N 2984.20 W 0.00 3577.03 7233.00 41.00 300.80 5942.64 2004.13 N 3037.90 ~ 0.30 3639.36 7328.00 40.30 300.40 6014.71 2035.63 N 3091.16 ~ 0.79 3701.19 7423.00 38.30 299.40 6088.22 2065.64 N 3143.32 ~ 2.21 3761.26 7518.00 37.20 298.60 6163.34 2093.84 N 3194.18 g 1.27 3819.27 7612.00 35.90 298.60 6238.85 2120.63 N 3243.33 g 1.38 3875.08 7707.00 33.90 299.00 6316.76 2146.81 N 3290.96 ~ 2.12 3929.28 7802.00 32.50 299.70 6396.25 2172.30 N 3336.30 W 1.53 3981.18 7896.00 30.90 301.80 6476.23 2197.54 N 3378.75 g 2.07 4030.52 7992.00 29.10 302.90 6559.36 2223.21 N 3419.31 ~ 1.96 4078.52 8087.00 26.90 303.20 6643.24 2247.53 N 3456.69 g 2.32 4123.11 8181.00 25.80 303.20 6727.47 2270.37 N 3491.60 g 1.17 4164.84 8276.00 25.00 303.90 6813.29 2292.89 N 3525.56 ~ 0.90 4205.58 8370.00 24.90 304.60 6898.52 2315.20 N 3558.34.g 0.33 4245.22 8465.00 24.20 303.60 6984.93 2337.34 N 3591.02 W 0.86 4284.69 8560.00 24.00 304.60 7071.65 2359.08 N 3623.14 ~ 0.48 4323.47 8655.00 23.90 303.30 7158.47 2380.62 N 3655.13 g 0.56 4362.03 8750.00 23.90 305.30 7245.32 2402.30 N 3686.92 ~ 0.85 4400.50 8845.00 23.70 305.30 7332.24 2424.46 N 3718.21 W 0.21 4438.81 8938.00 24.10 307.10 7417.27 2446.71 N 3748.61 g 0.89 4476.43 9033.00 23.90 306.00 7504.06 2469.72 N 3779.64 g 0.52 4515.00 9128.00 22.90 303.90 7591.25 2491.34 N 3810.56 ~ 1.37 4552.70 9221.00 21.20 302.50 7677.44 2510.47 N 3839.76 ~ 1.91 4587.61 All data is in feet unless otherwise stated Coordinates from slot #26 and TVD from RKB (73.90 Ft above mean sea level). Vertical section is from wellhead on azimuth 303.09 degrees. Declination is 0.00 degrees, Convergence is 1.02 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes INTEQ BP EXPLORATION (Alaska) Inc. Pad N,26 Prudhoe Bay, North Slope, Alaska SURVEY LISTING Page 3 Your ref : EMS <10139 - 10820'> Last revised : 25-Ju[-94 Measured [nc[in. Azimuth True Vert. R E ¢ T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C 0 0 R D I N A T E S Deg/lOOFt Sect 9315.00 18.80 302.20 7765.77 2527.68 N 3866.92 W 2.56 4619.76 9411.00 17.40 301.80 7857.01 2543.49 N 3892.20 W 1.46 4649.58 9505.00 16.10 300.40 7947.02 2557.49 N 3915.39 ~ 1.45 4676.65 9599.00 13.90 302.50 8037.82 2570.15 N 3936.16 ~ 2.41 4700.96 9691.00 12.70 302.50 8127.35 2581.52 N 3954.01 ~ 1.30 4722.12 9787.00 11.20 301.10 8221.26 2592.01 N 3970.89 ~ 1.59 4741.99 9882.00 10.50 300.80 8314.56 2601.21 N 3986.23 W 0.74 4759.86 9977.00 10.50 301.10 8407.97 2610.11 N 4001.08 ~ 0.06 4777.16 10071.00 10.70 300.80 8500.37 2619.00 N 4015.91 ~ 0.22 4794.44 10123.00 10.50 300.40 8551.48 2623.87 N 4024.14 ~ 0.41 4804.00 EMS 10139.00 10.92 299.59 8567.20 2625.36 N 4026.72 g 2.79 4806.97 10233.00 10.13 300.24 8659.62 2633.92 N 4041.60 W 0.85 4824.11 10327.00 9.68 300.88 8752.22 2642.14 N 4055.52 g 0.49 4840.26 10421.00 9.63 302.43 8844.89 2650.41 N 4068.94 ~ 0.28 4856.02 10515.00 9.44 303.18 8937.59 2658.85 N 4082.03 ~ 0.24 4871.60 10611.00 9.28 303.24 9032.31 2667.40 N 4095.09 ~ 0.17 4887.21 10703.00 8.86 304.59 9123.16 2675.49 N 4107.13 W 0.51 4901.71 10748.00 8.77 305.03 9167.63 2679.42 N 4112.79 ~ 0.25 4908.60 10820.00 8.77 305.03 9238.79 2685.72 N 4121.78 g 0.00 4919.57 Projected Data - NO SURVEY All data is in feet unless otherwise stated Coordinates from slot #26 and TVD from RKB (73.90 Ft above mean sea level). Vertical section is from wellhead on azimuth 303.09 degrees. Declination is 0.00 degrees, Convergence is 1.02 degrees. Calculation uses the minimum curvature method. Presented by Baker Hughes [NTEQ Bp £XPLoRATiON (Ala ~ PrUdhoe 8- Pad N.26 sk.) ~Y'N°~th'8~o~, Alaska SURVEy LISTING Pa YOur. tel: EH~ ~10~94. 10820,> HD Last Pevis~ . 25'JUL'94 108~0.00 y~.z~'~' ....... ~OOrd~ ==~=.. ~n ~e,,- 9238 ~ ~623.87 .. ' ........ " ' .... ====.~ 'Path ~721.7R . ~H$ ........ C°Jec~ Da~e . NO SURVEy R'ECEIVED AUG 1 2 1994 Alaska Oil & 6as Cons. Commission C°°rdfnare /i l [ data., .~ u~Stance ~ a~ TV ~_Unless _ Vec'~caL sec.~_ ~s 4919 ~ f,-o~ Decl inatfon'~on is fr~' on azi~.,tfS. 90 ~e Stated C~,- . ~s 0.00 ~" ~eL Lhe=~~n 303 ~CU~atio~ . uegcee. _~ on a.~0~ deap~_ een sea ~_. . n_ "USes ~ ~, L'OnVe- ~"~th 3~~es fc~ ... ~evel) ~resent~m ~.e minf~. ~gence ~,. . u~.09 d~ ~ellhea~. ' -o~ec HUgh-- '~rur ~s INtEO ~no~. ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 2 August 1994 RE: Transmittal of Data Sent by: ANCHORAGE EXPRS Dear Sir/Madam, Enclosed, please find the data as described below: WELL .{j ~ ~ ~ # DESCRIPTION ~~% ~ ~ ~/~ (~-~-~-~4~~ c~/~R LOW~ T~P~+~ST -- ',:~ --',,,,,~ Please sign and return to: Atlas W/r~/ne S~rv/ces 5600 B Street Suite 201 ~ Anch~°r~og~e~D ~ 9 p5 lu81 son Received Date: ECC No. Run # 1 1423.06 Run # 1 5806.02 Run # 1 5922.02 Run ~ 1 1317.01 Run # 1 6245.00 Please sign and return to: Petrotechnieal Data Oenter BP Exploration (Alaska) 900 East Benson Boulevard Anchorage, Alaska 99908 w~eeived by ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 27 July 1994 RE: Transmittal of Data ECC #: 6245.00 Sent by: ANCHORAGE EXPRS Data: LDWG Dear Sir/Madam, Reference: PRUDHOE BAY NORTH SLOPE, AK Enclosed, please find the data as described below: Prints/Films: 1 SSVD/MSDS FINAL BL 1 .,P~T/GR FINAL BL 1 -~IFL/GR/SP FINAL EL 1 ~,8~D/MSDS RF SEPIA 1 ~-4~N~ RF SEPIA 1 _.-'FMT/GR RF SEPIA 1 ...~IFL/GR/SP RF SEPIA Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 Atlas Wireli~'~~ces Please sign and return to: -~ · 5600 B Street ~'/[//~'~D Suite 201 4"' ~. ~~. _Paul~ Please sign and return ~o: Petrotechnical Data Cen~er BP Exploration (Alaska) Inc 900 East Benson Boulevard Anchorage, Alash& 99~08 Received by ALASKA OIL AND GAS CONSERVATION COMMISSION WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 May 25, 1994 Terry Jordan Drilling Engineer Supervisor BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit N-26 BP Exploration (Alaska), Inc. Permit No: 94-75 Sur. Loc. 2253'NSL, 4709'WEL, Sec. 8, TllN, R13E, UM Btmhole Loc. 4930'NSL, 3530'WEL, Sec. 7, TllN, R13E, UM Dear Mr. Jordan: Enclosed is the-approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. ~~m~2 Jo BY ORDER OF THE COMMISSION dlf/Enclosures CC: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.005 Re-Entry [] DeepenI-II Service [] Development Gas [] Single Zone [] Multiple Zone[] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration KBE = 71.2 feet Prudhoe Bay Fie/d/Prudhoe 3. Address 6. Property Designation Bay Pool P. O. Box 196612. Anchoraae. Alaska 99519-6612 ADL 28282 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 2o AAC 25.o25) 2253' NS/.., 4709' WEL, SEC. 8, T11N, R13E Prudhoe Bay Unit At top of productive interval 8. Well number Number 4877' NSL, 3447' WEL, SEC. 7, T11N, R13E N-26 (21-7-11-13) 2S 100302630-277 At total depth 9. Approximate spud date Amount 4930' NSL, 3530' WEL, SEC. 7, T11N, R13E 6/26/94 $200,000.00 12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth (MO and TVO) propert line ~DL 28260-1398' feet N-7-41'@ 1109'MD feet 2560 10835'MD/9229' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth ~000 feet Maximum hole an~ile4~.2~ o Maximum surface 3330 psig At total depth (TVD) ~800'/43~0 psig 18. Casing program Specifications Setting Depth s~ze Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.5# H-40 Weld 80' 30' 30' 11 O' 110' 260 sx Articset (Approx.) 13-1/2" 10-3/4" 45.5# NT8OLHE Butt 3366' 29' 29' 3395' 3071' llO0 sx CS 111/375 sx "G"/250 sxCS II 9-7/8" 7-5/8" 29.7# NT95HS NSCC 10118' 28' 28' 10146' 8550' 9-7/8" 7-5/8" 29.7# 13CR80 NSCC 689' 10146' 8550' 10835' 9229' 720 sx Class "G" Contingency Liner- 6-3/4" 5-1/2" 17# 13CR80 NSCC 852' 9996' 8402' 10835' 9229' 130 sx Class "G" 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor RECEIVED Surface Intermediate Production '1 9 1994 Liner Perforation depth' measured Alaska Oil & Gas Cons. Commission true vertical Anchorage 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program l'~l Drilling fluid program [] Time vs depth pict [] Refraction analysis l-I Seabed report[] 20 AAC 25.050 requirementsl-I 21. I hereby certify~ that t. he for,egoing is true and correct to the best of my knowledgeTM Signed /~d'~ Title Drillin~l Engineer Supervisor Date~-/~-~ ~' Commission Use Only Permit Number IAPI number IApproval date See cover letter ,~,/~'"-,~..~ 15 O-43~_..~-- ~.~_~ ~/,~,.~ I _ ~/-,~. ~,~'-"---- ~',/7~ for other requirements Conditions of approval Samples required [] Yes J~ No Mud Iog~equired []Ye§ .~ No Hydrogen sulfide measures [] Yes ,J~ No Directional survey required J~ Yes [] No Required working p~ressure for BOPE r-12M; CI3M; 1~5M; I-Il OM; I-I15M; Other: Original SJgrled By by order of Approved by David W. Johnston Commissioner me commission_.Date~'d-// ..... ~-//~'~f,.. , Form 10-401 Rev. 12-1-85 Submit in trild ]WellName: IN-26 PBU Well Plan Summary I Type of Well (producer or injector): [ Producer Surface Location: 2253' FSL 4709' FEL Sec 08 T1 IN R13E UM Target Location: 4877' FSL 3447' FEL Sec 07 T1 IN R13E UM Bottom Hole Location: 4930' FSL 3530' FEL Sec 07 T11N R13E UM I AFE Number: I 4P0576 ] I Estimated Start Date: I June 26, 1994 I IMD: I 10835' I ITVD: I Well Design (conventional, slimhole, etc.): I Rig: I Nabors 18-E I Operating days to complete: I 15 9229, I IRT-GL 129'a' IKBE:1 71.2' I Slimhole producer I I Formation Markers: Formation Tops MD TVD (BKB) Base Permafrost 2014' 1981' Ugnu Zone 4A 4260' 3721' Top Seabee (CM3) 6523' 5421' Kupanflc/Put River Absent Absent IKRU/LCU 8381' 6871' Top Sag River 10146' 8550' ,, ,- ,- ~- ~ ~ ~ r' rx Top Shublik 10181' 8585' K I' [.. tl i ¥ 12 LJ Top Sadlerochit 10268' 8671' Target 10268' 8671' M/~¥ '1 9 1994 Total Depth 10835' 9229' Aias~a uil& Gas uons. ¢ommission Anchorage Casing/Tubin: Program: Wt/Ft Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm Tbg O.D. MD/TVD MD/TVD 30" 20" 91.5# H-40 Weld 80' 30'/30' 110'/110' 13-1/2" 10-3/4" 45.5g NT80LHE Butt 3366' 29'/29' 3395'/3071' 9-7/8" 7-5/8" 29.7# NT95HS NSCC 10118 28'/28' 10146'/8550' 9-7/8" 7-5/8" 29.7# 13Cr-80 NSCC 689' 10146'/8550' 10835'/9229' Contingency 6-3/4" 5 1/2" 17# 13Cr-80 NSCC 852' 9996'/8402' 10835'/9229' Tubing 4 1/2" 12.6 13Cr-80 NSCT 9919 27'/27' 9946'/8353' Well Plan Summary Logging Program'. I Open Hole Logs: 13 1/2" Hole 9 7/8" Hole 6 3/4" Hole Cased Hole Lo~: 7 5/8" Casing 5 1/2" Liner None None GR/DIL/BHCS/CNL/SP None Optional SBT and Gyro Mud Program-. I Special design considerations I None Surface Mud Properties: I SPUD Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.5 100 20 15 20 9 15 to to to to to to to 9.5 300 60 60 80 10 25 Intermediate Mud Properties: [LSND Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.0 35 10 5 10 9.5 5 tO tO tO tO tO tO tO 10.0 50 15 10 20 10 10 Production Mud Properties: I LSND Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.8 30 8 3 7 8 6 to to to to to to to 9.2 45 13 10 15 9 8 Directional'. I KOP: I 1000' I Maximum Hole Angle: 1 41.28 degrees Close Approach Well: N-07 at 1109' (41' away) The above listed wells will be secured during the close approach. Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. RF..C£1YED Well Plan Summary ~A¥ ~ 9 1994 Gas Cons. Commission Anchorage PROPOSED DRILLING AND COMPLETION PROGRAM WELL N-26 [ 07-11-13 1PBU 1. MIRU. NU diverter and function test same. 2. Drill 13-1/2" hole. Run and cement 10-3/4", 45.5#, NT-80 Buttress casing to surface. 3. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Function test BOPE to 5000/250 psi. . Test 10-3/4" casing to 3000 psi for 30 minutes. A formation leak-off test will be performed 10' below the 10-3/4" shoe. . Longstring Option: Direcfionally drill 9-7/8" hole to TD. Run a 7-5/8", 29.7#, NT-95 NSCC by 7-5/8", 29.7#, 13Cr-80 NSCC casing string and cement with Class G cement around the 7-5/8" shoe. The annulus will be freeze protected with dry crude. Bump the plug with filtered seawater. Test casing to 3500 psi. 6a. Non-longstring Option: Directionally drill 9-7/8" hole to the 7-5/8" casing point above the top of Sag River. Run a 7-5/8", 29.7#, NT-95 NSCC casing string to within 10' of 9- 7/8" TD and cement with Class G cement around the 7-5/8" shoe. The annulus will be freeze protected with dry crude. 6b. Directionally drill the 6-3/4" hole to TD. Run 5-1/2", 17#, 13 Cr-80 NSCC liner from TD to 150' inside 7-5/8" casing shoe and cement using Class G cement. Clean out to 5-1/2" float equipment. Change over to filtered seawater completion fluid. Test casing and lap to 3500 psi. . Run 7-5/8" production packer on the 4-1/2", 12.6g, 13 Cr-80 NSCT tubing. A subsurface safety valve with dual control lines will be placed 100' below base of permafrost. Install and test Xmas tree. Freeze protect the tubing and annulus with diesel from surface to 2100' TVDBKB. Set and test packer. 8. The well will be perforated after the rig has been released. Fluids incidental to the drilling of a well will be injected down CC-2A. Tubing Size: 4-1/2", 12.6 # NT 13CR-80 tubing with 5 GLM's. RECEIV£g M~X¥ 19 1994 Gas Cons. Commission Anchorage Well Plan Summary CASING SIZE: 10-3/4" 10-3/4" SURFACE CASING CEMENT PROGRAM - BJ SERVICES CIRC. TEMP: 38°F PREFLUSH: 75 bbls fresh water ahead of lead slurry. LEAD CEMENT TYPE: COLD SET III ADDITIVES: retarder WEIGHT: 12.2ppg YIELD: 1.92ft3/sx MIX WATER: 10.53 gps APPROX. Cf SACKS: 1100 THICKENING TIME: Greater than 4 hrs. @ 50°F TAIL CEMENT TYPE: CLASS G ADDITIVES: 2% A-7 +1 ghs FP-6L WEIGHT: 15.8 ppg YIELD: 1.15 ft3/sx APPROX. Cf SACKS' 375 MIX WATER: 4.95 gps THICKENING TIME: Greater than 3-1/2 hrs @ 50°F TOP JOB CEMENT TYPE: COLD SET II WEIGHT: 14.5 ppg APPROX. Cf SACKS: 250 YIELD: 0.96 ft3/sx MIX WATER: 3.89 gps THICKENING TIME: Greater than 2 hrs @ 50°F CENTRALIZER PLACEMENT: 1. Run 1 bow type centralizer per joint for the first 15 joints. 2. Place the centralizers in the middle of each joint with a stop collar. CEMENT VOLUME: 1. Lead slm'ry from TD to surface w/100% excess (less the tail slurry volume). 2. Tail slurry volume 375 sx (to cover 500' of casing shoe w/100% excess). 3. Top job volume 250 sx. Well Plan Summary MAY '1 9 1994 0ii & Gas Cons. Commission Anchorage 7-5/8" LONGSTRING CASING CEMENT PROGRAM - BJ SERVICES CASING SIZE: 7-5/8" CIRC. TEMP: 140°F PREFLUSH: 20 bbls fresh water SPACER: 70 bbls BJ MCS-4 Spacer weighted 1.0 ppg above mud weight. LEAD CEMENT TYPE: CLASS G ADDITIVES: 3% A-2 + 0.4% FL-52 + 0.5% CD-32 + 1 ghs FP-6L WEIGHT: 11.0 ppg YIELD: 3.31 ft3/sx MIX WATER: 20.92 gps APPROX. # SACKS: 475 THICKENING TIME: 5 hrs FLUID LOSS: 150-250 cc/30 minutes FREE WATER: 0 cc TAIL CEMENT TYPE: CLASS G ADDITIVES: 0.3% FL-52 +0.5% CD-32 +0.1% A-2 + 1 ghs FP-6L WEIGHT: 15.8 ppg APPROX. # SACKS: 245 FLUID LOSS: 100-150 cc/30 minutes YIELD: 1.14 ft3/sx MIX WATER: 4.85 gps THICKENING TIME: 3-1/2 to 4-1/2 hrs FREE WATER: 0 cc CENTRALIZER PLACEMENT: 1. Run 2 Turbulator per joint to 300' MD above top of Sadlerochit. 2. Run 1 straight blade rigid centralizer every joint 300' above and below the Cretaceous interval. (only where lead cement is being pumped to the Cretaceous) 3. Run 1 solid body 7-3/4" x 9-1/4" centralizer or turbolator on first 2 joints inside 10-3/4" surface casing shoe. OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job requirement. Displace at 12 bpm. Mix lead slurry on the fly, batch mix the tail slurry. CEMENT VOLUME: 1. Lead slurry to 300' MD above top of Ugnu (top of Ugnu at 4260' MD) 2. Tail slurry to 500' biD above top of Sag River with 30% excess. 3. 80' MD 7-5/8", 29.7# capacity for float joints. Note: Hydrocarbon bearing zones are identified in the Ugnu interval. RECEIVED MAY 1 9 1994 Well Plan Summary 0il & Gas Cons. Commission Anchorage 5-1/2" PRODUCTION LINER CEMENT PROGRAM - BJ SERVICES CIRC. TEMP: 140° F BHST: 220° F at 8800' TVDSS. PREFLUSH: 20 bbls fresh water SPACER: 70 bbls BJ MCS-4 Spacer weighted 1.0 ppg above mud weight. CEMENT TYPE: CLASS G ADDITIVES: 150 ghs BA-86L + 0.6% CD-32 + 0.2% FL-33 + 0.2% A-2 + 0.5% gel + 2 ghs FP-10L WEIGHT: 15.7 ppg YIELD: 1.17 ft3/sx MIX WATER: 3.58 gps APPROX. 4/SACKS: 130 THICKENING TIME: 45 min. @ Surface + 3-4 hrs @ 140°F FLUD LOss': Iess than 50 cc/30 minutes @ 140°F FREE WATER: 0 cc at 45° angle. NOTE: Ensure that a thickening time test is performed that simulates the shut down time incurred while rotating off of the liner. Note gellation tendencies ( if any ) of slurry when consist@meter is re-started after shutdown period - additional retarder may be required - consult w/cementer. CENTRALIZER PLACEMENT: 1. Run 2 right hand turbolators per joint in open hole, 2. Run 1 right hand turbulator per joint in lap, and none opposite intermediate casing shoe.. OTHER CONSIDERATIONS: Batch mix the cement slurry. Perform fluid loss test on the batch mixed slurry. Fluid loss should be 50 cc/30 min. or less. Report actual fluid loss on morning report. Displace @ 6-8 bpm. LINER CEMENT VOLUME: 1. Open hole (6-3/4" X 5-1/2") + 30% excess (adjust if a caliper log is run and it indicates severe washouts). 2. 5-1/2", 174/casing capacity below landing collar (80'). 3. 150' liner lap (6.875" x 5-1/2") 4. 200' of cement on top of the liner in the 7-5/8" casing. Well Plan Summary RECEIVED MAY 19 i994, ~!~,ska Oil & Gas Cons. Commission Anchorage PRUDHOF BAY DRTI[TNG GROUP N-26 (P5) VERTICAL SECTION VIE Section at' 303.09 TVD Scale.' :~ inch = ~200 feet <KB> o ~ Dep Scale.' ~ inch = :~200 feet 05/06/9q ~ ~ , ~ ~ ~rawn 600' - " ~ ! , ,. Anadrj]] S~h]umb~rger 1200-- = ; , : Marker identification MD BKB SECTN ]NCLN ~ · . ~800- 5 ; Cl [N~ 0[ 2.50 ~I~ 255~ 25~2 570 .~ E) KOP DROP ~.50/~00 7550 6201 3808 4~.28 RSsT-F9~i F) END OF ~.50 DROP 9646 8058 4700 ~0.00 2400.-- ~ ~ G) 7-5/8" CASING POINT 10~46 8550 ~786 !0.00 ~ H] ....... TARGET ....... ~0258 8571 4803 ~0.00  :, I) REFERENCE TD DEPlH 10685 908~ 4880 ~0.00 i -, . ] J] TD I0835 9229 4906 ~0.00 ~ooo . k 5 ~o0~ 4200 : ~ ~ - i ~ ~ ~ " I -' .... F ......... ~ ..... ' ' ' · 6000~ :, ~ . . , i i ~00-- ~ ~ 7P00 = , ! . 9000 '~;i~: ~2¢~: J -1200 -600 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 6600 7200 Sect ion Departure ' ' , PRUDHOE BAY DRT_LLING GROUP 2750 AnadrJ ]1 Schlumberger ,, ,, ,, , , , , N-26 (P5) PLAN VIEW CLOSURE · 4906 feet at Azimuth 303.09 0 FT TAR;ET RADItlS ISCALE ....... : 1 inch = 500 feet ~ DRAWN ....... : 05/06/94 ............  ....... MarkerA) KB Identification MDo N/So E/Wo B) KOP BUILD 2.50/,00 ,000 0 0 ~ C) END OF 2.50 BUIt_D 265, 3,, 477 6) 7-5/8" CASING POINT 10,46 26,3 H) TARGET 10268 2625 4028 I) REFERENCE TD DEPTt4 ~0685 2664 4089 J) fD ~0835 2678 4~0 , 4250 4000 3750 3500 3250 3000 2750 2500 2250 2000 ,750 1500 ,250 ,000 750 500 250 0 250 <- WEST · EAST -> (Anadril] (c}93 N26P5 B1.52 9:53 AX I) WELL PERMIT CHECKLIST UNIT# PROGRAM: exp [] der ~ redrll [] serv [] ON/OFF SNORE ~5~ ADMINISTRATION ENGINEERING 1. Permit fee attached .................. N 2. Lease number appropriate ............... N 3. Unique well name and number .............. N 4. Well located in a defined pool ............. N 5. Well located proper distance from drlg unit boundary.. N 6. Well located proper distance from other wells ..... N ' 7. Sufficient acreage available in drilling unit ..... N 8. If deviated, is wellbore plat included ........ N 9. Operator only affected party ............. . N 10. Operator has appropriate bond in force ........ ' N Il. Permit can be issued without conservation order .... ' N 12. Permit can be issued without administrative approval. N 13. Can permit be approved before 15-day wait ....... N 14. Conductor string provided ............... 15. Surface casing protects all known USDWs ........ 16. CMT vol adequate to circulate on conductor & surf csg. 17. CMT vol adequate to tie-in long string to surf csg . . 18. CMT will cover all known productive horizons ...... 19. Casing designs adequate for C, T, B & permafrost .... 20. Adequate tankage or reserve pit ............. 21. If a re-drill, has a 10-403 for abndnmnt been approved. 22. Adequate wellbore separation proposed .......... 23. If diverter required, is it adequate .......... 24. Drilling fluid program schematic & equip list adequate 25. BOPEs adequate.. .................... 26. BOPE press rating adequate; test to ~%~ psig.~ 27. Choke manifold complies w/API RP-53 (M~y 84) ....... 28. Work will occur without operation shutdown ....... 29. Is presence of N2S gas probable ............. GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures .... Y 31. Data presented on potential overpressure zones ..... Y /N ~ 32. Seismic analysis 9f shallow gas zones .......... 33. Seabed condition survey (if off-shore) ......... / N 34. Contact name/phone for weekly progress reports .... / Y N [exploratory only] /' GEOLOGY: ENGINEERING: COMMI SS I ON: Comments/Instructions: Z HOW/lo - A:~ORMS~cheldist rtw 03/94 Well HistorY File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. I i N - 26 i i PRUDHOE BAY I 1 i 1 ~ . ~* . ' .- ~. :~ ~: .:'..~ ..... ., '. .,-~ - ~ . i ~ ~ . ~ ~ . _z:~: -?~.,.,_ ~ ~' ~, %- ' ,' '.'-... -' '- -. ' ' -~ ~ I % 1 i z~----'~ .... ~' : / ,/~Z-~: ?:--::5':~:-.:::_- '~:-~ '-"/ 7'.'/ / --- --~-" '-- i ~ ~. ~. -~x'._, '..~-~ ~- -:~- ....... ' '~'-'- -/ ~.: -- -~ ' ~ ~ ~l ~ -- "~ 1 ''~' ' ~ '~ ~;~ ' ~":',''E:'","E; ':'-; :-: -:~.'":~ -.'. -E'-.'-_-: ~' ~' · " '-~ '~ -- - --- ~ ,_ ~_ _ ~ -:- ,,~' ~ ~=~; ',-3;] ..... ~ · .E-"_~h''': ',''~-;~'~ ..-,- ~ ,~ ~ t ~~~ ' "~ X- ~'~ ~- .2~ ~ ' '~- ~ - -:'L'- - ~-- . -: ~_ :' "~: .. ~' .... ~ -~ · -'<~.- ==-,:~ -~- ~.~ -'EC~ ~'~ ~ / ..... . .: ' '2-'- '~ Frk ...... '~..C:' ~':~?F.- --' . ~- ~- ,~- ~ ~:~b~-'_~ = !-,..:-v.'~ 7 . ~ ~:.. '--:'. :~- ,~, .... : - :-::'~ ,-: :. . z ./1 Run4' [~;~,.~<~ ;:~.:;:.~:~5, i i :- .- -, .. - ~. ~ b... :. - .-~-. --.-- : · ,.. . · ~-.. ~ . ~..~;.~=~,~r;- L-~.pr~:..:_ .. -'-cq'~-;/. '-~'~' v. -~.- .~='u~? - ~ -..~-.: :.::- - ...- - ---. ~.r .... -_ ._ /- '~ _ _ -:; _~. :_ - _. · --- _ ~ ~ '~~{?~-~L::L~.~)?~-'~s~%_ ~: ...... u~;- ..... · _-, --.:-.....'...~. ' - :.' r .... ,,. -_.., :_ .-:; ;.:::.. '. ~. --. - - · . ~~~.L~_pL~?:?.~:,T?,~f~z:.~_:~::.~::?-;:¢t~,.~': .... ! ~ ' "~'- .... ~ -~ .... - ..... .~"~: ' -~ '~ '-: '-'-' '" -~f ~::---;'~* '-'-. '": f~;:~'~EP~E~fi'.~':fs:'Ef~4s~'.~Es~';~L~LE?~ ' ~ '."-f~i ~ ¢--,. - - -' - ~ - '~.*.. -- ' .., ~- .'' ' .'- ¢:':-¢-, -' .¢ '. -- ¢..': · . ¢' ' '~:A~>~$*<'.3¢~.'- '.,:'~q:-:'~-:'. U~r;,t-:~'as'=¢-- ..... .---:~-%"'c~.'*'~-~- :-u:~-;,,-.:-.~- ~ ! .... I Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD N - 26 500292248300 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 09-MAY-96 6245.08 ECK/RIC~LARDS S. KIORPES 8 liN 13E 2253 4709 73.90 .00 43.40 GRCH 10108.0 10116.5 10118.5 10122.0 10125.5 10131.0 10134.0 10136.0 10140.5 10151.0 10158.0 10183.0 10188.5 EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH 10107.5 10116.0 10118.5 10122.0 10125.5 10129.5 10133.0 10135.5 10140.5 10151.5 10158.0 10183.0 10188.5 BHCS GR 2 1 23-JUL-94 WESTERN ATLAS LOGGING SERVICES PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 2ND STRING 10.750 3410.0 45.50 3RD STRING 7.625 10810.0 29.70 PRODUCTION STRING 4.500 10095.0 12.60 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS 10!90.0 10154.0 102CI.5 10266.0 10216.0 10222.0 10226.0 10231.5 10251.0 10253.0 10256.5 10268.0 10271.0 $ 10190.0 10194.0 10201.5 10206.0 10216.5 10222.0 10226.0 10231.5 10250.5 10252.0 10256.0 10267.0 10269.5 CN/GR Cased Hole. TOOL OD IS 2.75". WELL TEST DATA TEST DATE ELAPSED TIME GROSS FLUID RATE NET OIL RATE NEW WATER RATE FORMATION GAS RATE LIFT GAS RATE CASING PRESSURE TGOR TGLR CHOKE OPENING MANIFOLD PRESSURE MANIFOLD TEMPERATURE WATER CUT 28-MAR- 96 HOURS 4.0 MBPD 2.92 MBOPD 0.60 MBWPD 2.32 MMSCFD 1.44 SCF/STB 2412 MMSCFD 2.48 PSIG 1422 SCF/STB 6579 SCF/BBL 1343 95.9 PSIG 209 DEGF 149 PCNT 79.6 NEUTRON LOG PARAMETERS: SANDSTONE MATRIX, CALIPER & CASING CORRECTED, SALINITY = 0 PPM. SHIFT PROCEDURE AS FOLLOWS: 1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE GAMMA RAY. 2) FIRST PASS NEUTRON DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4) ALL SUBSEQUENT NEUTRON PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS NEUTRON. /? ?MATCH1A. OUT $ FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 START DEPTH 10100.0 10100.0 BASELINE DEPTH NPHI 10107.5 10108.0 10116.0 10116.5 10118.5 10118.5 10122.0 10122.0 10125.5 10125.5 10129.5 10131.0 10133.0 10134.0 10135.5 10136.0 10140.5 10140.5 10145.5 10144.5 10151.5 10151.0 10158.0 10158.0 10177.5 10177.0 10179.5 10179.0 10183.0 10183.0 10188.5 10188.5 10190.0 10190.0 10194.0 10194.0 10201.5 10201.5 10206.0 10206.0 10209.0 10208.5 10215.0 10214.0 10220.0 10219.5 10224.0 10223.5 10226.5 10225.5 10231.5 10231.5 10240.0 10239.0 10251.0 10250.0 10253.0 10252.0 10256.5 10256.0 10268.0 10267.0 10271.0 10269.5 $ REMARKS: STOP DEPTH 10277.0 10285.0 files. (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH PASS 1. FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI. GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY. / ? ?MATCH1B. OUT $ CN : BP EXPLORATION WN : N- 26 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALAS~ * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 4 2 NPHI 2418 68 1 PU-S 4 3 FUCT 2418 68 1 CPS 4 4 NUCT 2418 68 1 CPS 4 5 TENS 2418 68 1 LB 4 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 12 Tape File Start Depth = 10315.000000 Tape File End Depth = 10075.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 2887 datums Tape Subfile: 2 188 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GRCH 10100.0 2418 10100.0 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 STOP DEPTH 10277.0 10285.0 (MEASURED DEPTH) BASELINE DEPTH GRCH 10104.0 10104.5 10128.0 10128.0 10133.5 10134.0 10140.0 10139.5 10141.5 10141.0 10145.5 10144.5 10151.0 10150.5 10151.5 10151.5 10156.5 10155.5 10161.5 10161.5 10171.0 10170.5 10174.5 10174.0 10179.0 10178.5 10179.5 10179.5 10183.5 10183.5 10191.5 10191.5 10201.0 10200.5 10204.0 10204.0 10204.5 10205.0 10206.0 10206.0 10208.0 10208.5 10215.0 10215.5 10214.5 10219.0 10218.0 10220.5 10220.5 10220.0 10222.0 10221.5 10229.0 10228.5 10230.0 10229.0 10236.0 10236.0 10236.5 10235.5 10237.0 10236.5 10239.5 10238.0 10254.5 10254.0 10255.5 10254.5 10254.0 10256.5 10254.5 10274.5 10273.5 10280.5 10279.5 $ EQUIVALENT UNSHIFTED DEPTH NPHI REMARKS: PASS 2. FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI. /? ?MATCH2A. OUT /? ?MATCH2B. OUT $ CN : BP EXPLORATION WN : N - 26 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GA]~I 4 2 NPHI 2418 68 1 PU-S 4 3 FUCT 2418 68 1 CPS 4 4 NUCT 2418 68 1 CPS 4 5 TENS 2418 68 1 LB 4 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 12 Tape File Start Depth = 10315.000000 Tape File End Depth = 10075.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 2887 datums Tape Subfile: 3 82 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass PASS NUMBER: 3 DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE~ GRCH 2418 $ CURVE SHIFT DATA - .5000 START DEPTH 10100.0 10100.0 PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 STOP DEPTH 10277.0 10285.0 (MEASURED DEPTH) BASELINE DEPTH 10104.0 10133.0 10136.0 10144.0 10145.0 10146.0 10147.0 10150.0 10150.5 10152.0 10160.5 10171.5 10183.5 10192.0 10193.0 10195.5 10196.0 10197.5 10201.0 10203.5 10204.0 10213.0 10216.0 10216.5 10217.5 10219.0 10220.0 10221.5 10224.0 10225.5 10226.5 10228.0 10228.5 10230.5 10238.0 10243.5 10244.0 GRCH 10104.5 10134.0 10136.5 10144.5 10145.0 10150.0 10151.0 10216.5 10221.5 10228.0 10244.0 in separate files. EQUIVALENT UNSHIFTED DEPTH NPHI 10145.5 10147.5 10152.0 10161.0 10172.0 10184.0 10192.5 10193.0 10195.5 10196.5 10198.0 10201.5 10203.5 10204.5 10214.0 10217.0 10217.5 10219.0 10219.5 10221.0 10224.0 10225.5 10226.0 10227.5 10228.5 10230.5 10237.0 10243.0 10244.5 10254.5 10257.0 10265.0 10266.0 10267.5 10268.5 10280.5 $ REMARKS: 10244.5 10265.0 10265.5 10267.0 10267.5 10244.0 10254.0 10255.5 10279.5 PASS 3. FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI. / ? ?MATCH3A. OUT /? ?MATCH3B. OUT $ CN : BP EXPLORATION WN : N - 26 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 4 2 NPHI 2418 68 1 PU-S 4 3 FUCT 2418 68 1 CPS 4 4 NUCT 2418 68 1 CPS 4 5 TENS 2418 68 1 LB 4 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 12 Tape File Start Depth = 10315.000000 Tape File End Depth = 10075.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 5774 datums Tape Subfile: 4 Minimum record length: Maximum record length: 91 records... 62 bytes 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 START DEPTH 10100.0 10100.0 BASELINE DEPTH GRCH 10104.0 10104.5 10105.5 10105.0 10106.5 10106.0 10116.5 10116.5 10119.0 10118.5 10122.0 10121.5 10127.5 10129.5 10132.0 10133.0 10132.5 10133.5 10140.5 10141.0 10141.0 10141.5 10144.5 10144.5 10145 . 5 10145.0 10146.0 10147.5 10151.5 10154.5 10154.0 10155.0 10155.0 10158.0 10158.5 10160.5 10165.0 10167.0 10166.5 10171.0 10174.0 10175.5 10175.0 10180.0 10182.5 10182.5 10183.5 10190.0 10191.0 10195.5 10199.5 10202.5 10203.5 10204.5 STOP DEPTH 10277.0 10285.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH NPHI 10139.0 10140.0 10145.-0 10147.0 10150.5 10153.5 10154.5 10157.5 10159.0 10161.0 10163.0 10169.0 10173.0 10178.5 10183.5 10190.0 10190.5 10195.0 10199.5 10202.5 10203.0 10204.0 10205.0 10208.5 10209.0 10212.5 10215.5 10216.5 10217.5 10222.0 10226.0 10226.5 10227.5 10231.5 10245.5 10246.5 10249.5 10250.0 10251.0 10252.0 10254.5 10255.5 10256.0 10257.0 10260.5 10263.5 10267.5 10268.5 10273.0 $ REMARKS: 10205.0 10208.5 10210.0 10212.5 10216.0 10215.0 10217.0 10217.5 10221.5 10226.5 10226.0 10226.5 10231.5 10245.5 10246.0 10249.0 10250.0 10251.0 10251.5 10253.5 10254.0 10254.5 10255.0 10259.0 10262.0 10267.0 10267.5 10272.0 PASS 4. FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI. / ? ?MATCH4A. OUT /? ?MATCH4B . OUT $ CN : BP EXPLORATION WN : N - 26 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: 1 2 3 4 5 Name Tool Code Samples Units GRCH 2418 68 1 GAPI NPHI 2418 68 1 PU-S FUCT 2418 68 1 CPS NI3CT 2418 68 1 CPS TENS 2418 68 1 LB Size API API API API Log Crv Crv Length Typ Typ Cls Mod 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 4 42 995 99 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 12 20 Tape File Start Depth = 10315.000000 Tape File End Depth = 10075.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 5774 datums Tape Subfile: 5 110 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 AVEPJkGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. Pulsed Neutron: Unaveraged edited Pass 1 gamma ray and background counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT: .5000 PA~SES INCLUDED IN AVERAGE PBU TOOL CODE PASS NUMBERS GRCH 2418 $ REM_ARKS: 1, 2, 3, 4 1, 2, 3, 4 AVERAGED PASS. GRCH, NPHI, FUCT, & NUCT WERE AVERAGED FOR ALL 4 PASSES. $ CN : BP EXPLORATION WN : N - 26 FN : PRUDHOE BAY COLIN : NORTH SLOPE STAT : ALASKA * FOPdVLAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH CNAV 68 1 GAPI 4 2 NPHI CNAV 68 1 PU-S 4 3 FUCT CNAV 68 1 CPS 4 4 NIICT CNAV 68 1 CPS 4 4 38 995 99 1 4 38 995 99 1 4 38 995 99 1 4 38 995 99 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 10 Tape File Start Depth = 10315.000000 Tape File End Depth = 10075.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 8180 datums Tape Subfile: 6 33 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10100.0 2418 10100.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10300.0 10300.0 19-APR-96 ECLIPSE 2.1 80O 10734.0 10288.0 10100.0 10286.0 1500.0 YES 19-APR-96 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCM PULSE CODE MODULATOR GR GAMMA RAY CN COMPENSATED NEUTRON $ TOOL NUMBER 8250EA/8248EA 8262XA 2418XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT) : LOGGER'S CASING DEPTH (FT) : .000 10810.0 .0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS/OIL RATIO: CHOKE (DEG) : PRODUCED FLUIDS .00 .0 .0 0 6900.0 .000 .000 .000 .0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): .0 BASE NORMALIZING WINDOW (FT) : .0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 1600 NEAR COUNT RATE LOW SCALE (CPS): 700 NEAR COUNT RATE HIGH SCALE (CPS): 16700 TOOL STANDOFF (IN): .0 REMARKS: PASS 1. $ CN : BP EXPLORATION WN : N - 26 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 9 Curves: Name Tool Code Samples Units Size API API API API Log Crv Crv Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU- S 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TTEN 2418 68 1 LB 4 9 TEN 2418 68 1 LB 4 4 42 310 01 4 42 995 99 4 42 890 01 4 42 334 31 4 42 334 3 0 4 42 150 01 4 42 636 99 4 42 635 99 4 42 635 99 36 * DATA RECORD (TYPE# 0 ) 1006 BYTES * Total Data Records: 38 Tape File Start Depth = 10316.000000 Tape File End Depth = 10081.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 15185 datums Tape Subfile: 7 112 records... Minimum record length: Maximum record length: 62 bytes 1006 bytes Tape Subfile 8 is type: LIS FILE HEADER F I LE NUMBER: 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10100.0 2418 10100.0 $ LOG HEADER DATA STOP DEPTH 10300.0 10300.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCM PULSE CODE MODULATOR GR GAMMA RAY CN COMPENSATED NEUTRON $ 19-APR-96 ECLIPSE 2.1 900 19-APR-96 10734.0 10288.0 10100.0 10286.0 1500.0 YES TOOL NUMBER 8250EA/8248EA 8262XA 2418XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT): LOGGER' S CASING DEPTH (FT) : .000 10810.0 .0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS/OIL RATIO: CHOKE (DEG) : PRODUCED FLUIDS .00 .0 .0 0 6900.0 .000 .000 .000 .0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : THERMAL SANDSTONE .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): .0 BASE NORMAJ~IZING WINDOW (FT) : . 0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 1600 NEAR COUNT RATE LOW SCALE (CPS) : 700 NEAR COUNT RATE HIGH SCALE (CPS): 16700 TOOL STANDOFF (IN) : .0 REMARKS: PASS 2. $ CN : BP EXPLORATION WN : N - 26 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORblAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 9 Curves: Name Tool Code Samples Units Size API API API API Log Crv Crv Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU-S 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TTEN 2418 68 1 LB 4 9 TEN 2418 68 1 LB 4 4 42 310 01 4 42 995 99 4 42 890 01 4 42 334 31 4 42 334 30 4 42 150 01 4 42 636 99 4 42 635 99 4 42 635 99 36 * DATA RECORD (TYPE# 0 ) 1006 BYTES * Total Data Records: 38 Tape File Start Depth = 10312.000000 Tape File End Depth = 10078.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 17551 datums Tape Subfile: 8 112 records... Minimum record length: Maximum record length: 62 bytes 1006 bytes Tape Subfile 9 is type: LIS FILE HEADER FILE NUMBER: 8 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NI/MBER: 3 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10100.0 2418 10100.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10296.0 10300.0 19-APR-96 ECLIPSE 2.1 1000 19-APR-96 10734.0 10288.0 10100.0 10286.0 1500.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCM PULSE CODE MODULATOR GR GAMMA RAY CN COMPENSATED NEUTRON $ TOOL NUMBER 8250EA/S248F21 8262XA 2418XA BORE~{OLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT) : LOGGER'S CASING DEPTH (FT): .000 10810.0 .0 BORE~tOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G) : SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM): FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT): GAS/OIL R3kTIO: C}{OKE (DEG) : PRODUCED FLUIDS .00 .0 .0 0 6900.0 .000 .000 .000 .0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : .0 BASE NORMALIZING WINDOW (FT) : .0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS) : 1600 NEAR COUNT RATE LOW SCALE (CPS) : 700 NEAR COUNT RATE HIGH SCALE (CPS): 16700 TOOL STANDOFF (IN): .0 REMARKS: PASS 3. $ CN : BP EXPLORATION WN : N - 26 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 9 Curves: Name Tool Code Samples Units API API API API Lo~ Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU-S 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TTEN 2418 68 1 LB 4 9 TEN 2418 68 1 LB 4 4 42 310 01 1 4 42 995 99 1 4 42 890 01 1 4 42 334 31 1 4 42 334 30 1 4 42 150 01 1 4 42 636 99 1 4 42 635 99 1 4 42 635 99 1 36 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 38 Tape File Start Depth = 10308.000000 Tape File End Depth = 10076.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 24476 datums Tape Subfile: 9 112 records... Minimum record length: Maximum record length: 62 by~es 1006 bytes Tape Subfile 10 is type: LIS FILE HEADER FILE NUMBER: 9 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 4 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10100.0 2418 10100.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10295.0 10300.0 19-APR-96 ECLIPSE 2.1 1100 19-APR-96 10734.0 10288.0 10100.0 10286.0 1500.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCM PULSE CODE MODULATOR GR GAMMA RAY CN COMPENSATED NEUTRON $ TOOL NUMBER 8250EA/8248EA 8262XA 2418XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT) : LOGGER'S CASING DEPTH (FT) : .000 10810.0 .0 BOREHOLE COND I T IONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT): GAS/OIL R3tTIO: CHOKE (DEG): PRODUCED FLUIDS .00 .0 .0 0 6900.0 .000 .000 .000 .0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: MOLE CORRECTION (IN): THERMAL SANDSTONE .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): .0 BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 0 FAR COUNT RATE HIGH SCALE (CPS): 1600 NEAR COUNT RATE LOW SCALE (CPS) : 700 NEAR COUNT RATE HIGH SCALE (CPS): 16700 TOOL STANDOFF (IN): .0 REMARKS: PASS 4. $ CN : BP EXPLORATION WN : N- 26 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA .0 * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 9 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU-S 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TTEN 2418 68 1 LB 4 9 TEN 2418 68 1 LB 4 4 42 310 01 1 4 42 995 99 1 4 42 890 01 1 4 42 334 31 1 4 42 334 30 1 4 42 150 01 1 4 42 636 99 1 4 42 635 99 1 4 42 635 99 1 36 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 39 Tape File Start Depth = 10307.000000 Tape File End Depth = 10069.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 27082 datums Tape Subfile: 10 113 records... Minimum record length: Maximum record length: 62 bytes 1006 bytes Tape Subfile 11 is type: LIS 96/ 5/09 01 **** REEL TRAILER **** 96/ 5/10 01 Tape Subfile: 11 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Fri 10 MAY 96 4:41a Elapsed execution time = 1.92 seconds. SYSTEM RETURN CODE = 0 Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD N - 26 500292248300 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 01-JUN-95 6245.04 K. BRUNNER K. COYNE 8 liN 13E 2253 4709 73.90 72.40 43.40 OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 2ND STRING 10.750 3410.0 3RD STRING 7.625 10810.0 PRODUCTION STRING 4.500 10095.0 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BHCS GR 2 1 23-JUL-94 WESTERN ATLAS BASELINE DEPTH 10132.5 10140.0 10151.5 10180.5 10189.0 10193.5 10203.0 10206.0 10216.0 10226.5 10228.5 10251.5 10256.5 GRCH 10122.5 10128.5 10140.0 10168.5 10177.5 10182.0 10191.5 10195.0 10205.5 10215.0 10217.0 10240.0 10244.5 EQUIVALENT UNSHIFTED DEPTH 45.50 29.70 12.60 10271.0 10285.0 10307.5 10325.0 10329.0 10363.5 10389.5 10392.5 10396.0 10422.0 10474.5 10555.5 10576.0 10579.0 10600.0 10616.5 10636.0 10647.5 10655.5 $ REMARKS: 10259.5 10274.0 10296.5 10312.5 10317.5 10351.5 10377.5 10380.5 10384.0 10410.0 10462.0 10543.5 10563.5 10566.5 10587.5 10604.5 10623.5 10634.5 10641.5 PDK-100/GR. LOG TIED INTO 23-JUL-94 ACOUSTILOG. LOGGING SUITE ORGANIZATION: 1) BASE SEAWATER PASS. 2) 20 BBLS BORAX AWAY PASS (this was logged with two separate passes which have been spliced for this LDWG). 3) 40 BBLS BORAX AWAY PASS. 4) 60 BBLS BORAX AWAY PASS. 5) FLUSH PASS. A DIFFUSION CORRECTED SGMA CURVE IS INCLUDED FOR THE BASE SEAWATER PASS. THE CURVE IS CALLED SGNT AND WAS CORRECTED WITH THE FOLLOWING PARAMETERS: BOREHOLE SIZE = 8.0" CASING SIZE = 7.0" SALINITY = 25,000 PPM. A PDK POROSITY CURVE (PHI) WAS ALSO CREATED FOR THE BASE SEAWATER PASS. SHIFT PROCEDURE AS FOLLOWS: 1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE GAMMA RAY. 2) FIRST PASS PDK DEPTH MATCHED TO "SHIFTED" FIRST'PASS GAMMA RAY. 3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4) ALL SUBSEQUENT PDK PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS PDK. / ? ?MATCH1A . OUT $ FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 START DEPTH 10108.0 10120.0 BASELINE DEPTH SGMA 10132.5 10122.5 10140.0 10128.5 10151.5 10139.5 10180.5 10168.5 10189.0 10177.5 10193.5 10182.0 10203.0 10191.5 10206.0 10194.5 10216.0 10203.5 10221.5 10210.5 10224.5 10212.5 10226.5 10215.0 10232.0 10219.5 10240.5 10228.5 10251.0 10239.5 10256.5 10244.5 10271.0 10259.5 10285.0 10274.0 10307.5 10296.5 10325.0 10313.0 10329.0 10317.5 10363.5 10351.5 10389.5 10377.5 10392.5 10380.5 10396.0 10384.0 10412.0 10400.0 10422.0 10410.0 10474.5 10462.0 10555.5 10543.5 10576.0 10563.5 10579.0 10566.5 10600.0 10587.5 10616.5 10604.5 10636.0 10624.5 10647.5 10635.0 10655.0 10643.0 $ REMARKS: BASE PASS. STOP DEPTH 10654.0 10666.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH ALL PDK CURVES WERE SHIFTED WITH SGMA. GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY. CN WN FN COUN STAT / ? ?MATCH1B . OUT $ : BP' EXPLORATION (ALASKA) :N-26 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 16 Curves: Name Tool Code Samples Units 1 GRCH PDK 68 1 GAPI 2 BIF PDK 68 1 3 BKL PDK 68 1 CPS 4 BKS PDK 68 1 CPS 5 CSLS PDK 68 1 CU 6 LS PDK 68 1 CPS 7 SS PDK 68 1 CPS 8 MSD PDK 68 1 CU 9 RATO PDK 68 1 10 RBOR PDK 68 1 11 RICS PDK 68 1 12 RIN PDK 68 1 13 SGMA PDK 68 1 CU 14 SGMB PDK 68 1 CU 15 SGNT PDK 68 1 CU 16 PHI PDK 68 1 PU-S API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 64 * DATA RECORD (TYPE# 0) Total Data Records: 96 958 BYTES * Tape File Start Depth = 10680.000000 Tape File End Depth = 10010.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 22798 datums Tape Subfile: 2 Minimum record length: Maximum record length: 280 records... 62 bytes 958 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves PASS NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GRCH 10108.0 PDK 10120.0 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 BASELINE DEPTH GRCH 10132.5 10128.5 10137.0 10141.0 10141.5 10142.5 10146.0 10147.0 10147.5 10149 10150 10151 10156 10162 10175 10185 .0 .0 .5 .0 .5 .5 .0 10185.5 10188.5 10189.0 10191.5 10192.0 10195.5 10196.5 10203.0 10206.0 10216.0 10221.5 10225.5 10226.5 10228.5 10239.0 10239.5 10250.5 10251.0 10Z56.5 10258.5 10270.5 10271.0 10136.0 10138.0 10140.0 10145.5 10169.5 10183.0 10186.5 10197.0 10200.5 10210.5 10215.5 10220.0 10223.0 10245.0 10250.0 10263.5 for each pass in separate files. STOP DEPTH 10650.0 10662.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH SGMA 10131.0 10135.0 10140.5 10141.5 10143.0 10143.5 10149.5 10155.5 10169.5 10179.0 10180.0 10183.0 10186.0 10190.0 10190.5 10219.5 10220.0 10232.5 10233.5 10245.0 10252.0 10263.5 10278.0 10280.5 10281.0 10287.5 10295.5 10304.0 10307.5 10316.5 10320.0 10325.0 10327.0 10329.5 10333.0 10364.0 10371.5 10376.5 10381.5 10383.5 10386.5 10388.5 10389.5 10392.0 10396.0 10400.0 10401.0 10402.0 10412.0 10418.0 10421.5 10436.0 10437.0 10454.0 10495.5 10510.0 10513.5 10576.0 10578.5 10579.0 10600.0 10605.5 10615.0 10615.5 10616.5 10636.0 10647.5 10652.5 10655.5 $ REMARKS: 10273.0 10275.5 10275.0 10275.5 10282.0 10290.0 10299.0 10303.5 10310.0 10315.0 10319.5 10320.5 10324.0 10327.0 10358.0 10365.5 10370.5 10376.5 10377.5 10381.0 10382.5 10384.0 10386.5 10390.5 10394.5 10395.5 10396.0 10406.0 10412.5 10416.0 10430.5 10431.0 10448.0 10490.5 10505.5 10508.5 10571.0 10573.5 10574.0 10595.5 10601.0 10610.5 10611.5 10612.0 10631.5 10643.5 10648.5 10651.5 20 BBLS BORAX AWAY PASS. ALL PDK CURVES WERE SHIFTED WITH SGMA. CN WN FN /??MATCH2A.OUT /??MATCH2B.OUT $ : BP EXPLORATION : N - 26 : PRUDHOE BAY (ALASKA) · COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 14 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH PDK 68 1 GAPI 2 BIF PDK 68 1 3 BKL PDK 68 1 CPS 4 BKS PDK 68 1 CPS 5 CSLS PDK 68 1 CU 6 LS PDK 68 1 CPS 7 SS PDK 68 1 CPS 8 MSD PDK 68 1 CU 9 RATO PDK 68 1 10 RBOR PDK 68 1 11 RICS PDK 68 1 12 RIN PDK 68 1 13 SGMA PDK 68 1 CU 14 SGMB PDK 68 1 CU 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 4 4 51 995 99 1 56 * DATA RECORD (TYPE# 0) 966 BYTES * Total Data Records: 84 Tape File Start Depth = 10680.000000 Tape File End Depth = 10010.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 20116 datums Tape Subfile: 3 202 records... Minimum record length: Maximum record length: 62 bytes 966 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass PASS NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 START DEPTH 10108.0 10120.0 STOP DEPTH 10484.0 10496.0 (MEASURED DEPTH) BASELINE DEPTH 10124.0 10140.0 10143.0 10145.0 10146.0 10151.5 10153.0 10162.0 10163.0 10172.5 10184.5 10185.5 10192.0 10193.0 10218.0 10219.0 10220.5 10221.5 10234.0 10236.0 10238.0 10240.0 10243.0 10244.0 10251.0 10257.0 10258.0 10258.5 10270.5 10271.5 10281.0 10287.5 10291.0 10303.0 10306.0 10315.0 10324.5 GRCH 10119.0 10134.0 10136.5 10139.0 10178.0 10187.0 10214.5 10215.0 10245.0 10250.5 10251.0 10251.5 10263.5 10281.5 10297.0 in separate files. EQUIVALENT UNSHIFTED DEPTH SGMA 10139.5 10144.5 10146.0 10155.0 10156.0 10166.0 10179.5 10186.0 10186.5 10211.5 10212.0 10227.0 10229.5 10231.5 10233.5 10237.0 10237.5 10251.5 10262.5 10275.5 10285.0 10300.5 10309.0 10318.5 10326.0 10330.5 10331.5 10353.0 10365.5 10374.0 10381.0 10383.0 10389.0 10394.0 10411.5 10413.5 10421.5 10422.0 10422.5 10432.5 10433.5 10454.5 10475.5 $ REMARKS: 10320.0 10324.5 10325.0 10347.0 10359.0 10367.5 10374.5 10376.0 10383.0 10387.5 10405.0 10407.0 10415.0 10415.5 10416.5 10426.5 10427.0 10448.0 10469.0 40 BBLS BORAX AWAY PASS. ALL PDK CURVES WERE SHIFTED WITH SGMA. CN FN COUN STAT / ??MATCH3A. OUT / ??MATCH3B. OUT $ : BP EXPLORATION (ALASKA) :N-26 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 14 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 2 3 4 5 6 7 8 9 10 11 12 13 GRCH PDK 68 1 GAPI BIF PDK 68 1 BKL PDK 68 1 CPS BKS PDK 68 1 CPS CSLS PDK 68 1 CU LS PDK 68 1 CPS SS PDK 68 1 CPS MSD PDK 68 1 CU RATO PDK 68 1 RDOR PDK 68 1 RICS PDK 68 1 RIN PDK 68 1 SGMA PDK 68 1 CU 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 14 SGMB PDK 68 1 CU 4 4 51 995 99 1 * DATA RECORD (TYPE# 0) Total Data Records: 84 966 BYTES * 56 Tape File Start Depth = 10680.000000 Tape File End Depth = 10010.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 42914 datums Tape Subfile: 4 174 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 EDITED CURVES Depth shifted and clipped curves for each pass PASS NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 START DEPTH 10108.0 10120.0 STOP DEPTH 10484.0 10496.0 (MEASURED DEPTH) BASELINE DEPTH GRCH 10132.5 10133.5 10141.0 10140.0 10142.5 10143.0 10147.5 10147.0 10160.0 10159.0 10161.0 10159.5 10162.0 10160.5 10180.5 10180.0 10189.5 10189.0 10190.0 10190.0 10197.5 10197.5 10198.5 10198.0 10206.0 10205.5 10208.0 10207.5 10216.0 10216.5 10221.5 10221.0 10223.5 10222.5 10225.5 10225.0 10227.5 10227.5 10237.5 10236.5 10243.0 10242.5 10243.5 10243.5 10244.5 10244.0 10249.5 10249.0 10250.0 10250.0 10250.5 10250.5 10251.5 10251.0 10253.0 10252.5 10254.0 10253.0 10257.0 10256.0 10265.0 10264.5 10266.0 10265.0 10270.5 10268.0 10Z7Z.5 10271.0 10276.5 10277.0 10277.5 10278.0 10278.5 10278.5 in separate files. EQUIVALENT UNSHIFTED DEPTH SGMA 10287.0 10287.5 10303.0 10304.0 10304.5 10305.5 10311.0 10312.0 10315.0 10315.5 10320.0 10324.5 10325.0 10327.0 10331.0 10337.5 10338.5 10354.0 10355.0 10362.0 10379.5 10381.0 10386.0 10392.0 10400.0 10416.0 10416.5 10422.0 10426.0 10427.0 10428.5 10431.0 i0440.5 10441.5 10442.0 10454.0 10475.0 $ REMARKS: 10287.0 10288.0 10288.0 10303.5 10304.0 10305.5 10306.5 10311.0 10311.5 10315.5 10315.5 10320.0 10324.5 10324.0 10326.5 10331.0 10337.5 10338.0 10354.0 10354.5 10361.5 10379.5 10380.5 10385.5 10391.5 10400.0 10415.5 10416.5 10421.5 10426.0 10426.5 10428.0 10431.0 10440.5 10441.0 10441.5 10453.5 10474.5 60 BBLS BORAX AWAY PASS. ALL PDK CURVES WERE SHIFTED WITH SGMA. /??MATCH4A. OUT ?MATCH4 B. OUT CN : BP EXPLORATION WN : N - 26 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 14 Curves: (ALASKA) Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CSLS PDK 68 1 CU 4 6 LS PDK 68 1 CPS 4 7 SS PDK 68 1 CPS 4 8 MSD PDK 68 1 CU 4 9 RATO PDK 68 1 4 10 RBOR PDK 68 1 4 11 RICS PDK 68 1 4 12 RIN PDK 68 1 4 13 SGMA PDK 68 1 CU 4 14 SGMB PDK 68 1 CU 4 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 56 * DATA RECORD (TYPE# 0) Total Data Records: 84 966 BYTES * Tape File Start Depth = 10680.000000 Tape File End Depth = 10010.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 40232 datums Tape Subfile: 5 192 records... Minimum record length: Maximum record length: 62 bytes 966 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 EDITED CURVES Depth shifted and clipped curves for each pass PASS NUMBER: 5 DEPTH INCREMENT: .5000 FILE S~Y PBU TOOL CODE GRCH PDK $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE GRCH PASS NUMBER: 1 START DEPTH 10028.0 10040.0 STOP DEPTH 10490.0 10502.0 (MEASURED DEPTH) BASELINE DEPTH GRCH 10123.0 10122.0 10132.0 10131.5 10143.0 10140.5 10144.5 10161.0 10163.0 10163.5 10175.5 10172.5 10177.5 10174.5 10180.0 10185.5 10183.0 10191.5 10189.0 10222.5 10220.5 10229.0 10227.0 10230.0 10227.5 10232.0 10233.0 10243.5 10244.0 10254.5 10252.0 10255.5 10252.5 10266.0 10263.0 10276.0 10276.5 10279.0 10287.5 10286.0 10289.0 10301.5 10300.0 10305.0 10303.5 10308.0 10307.0 10308.5 10326.5 10324.5 10337.0 10335.0 10~§.0 10335.5 10349.0 10364.0 10393.0 in separate files. EQUIVALENT UNSHIFTED DEPTH SGMA 10141.5 10158.0 10158.5 10159.0 10177.5 10229.5 10230.0 10240.5 10241.5 10273.5 10274.5 10277.0 10287.5 10307.0 10346.5 10362.5 10390.5 10400.0 10400.5 10417.5 10418.0 10422.5 10426.0 10428.5 10431.0 10433.0 10433.5 10441.0 10454.5 10455.0 10468.0 10470.0 10495.5 10496.0 $ REMARKS: 10397.5 10398.5 10416.0 10426.0 10415.0 10420.5 10424.0 10428.5 10430.5 10431.5 10439.0 10452.0 10452.5 10465.0 10467.0 10493.0 10493.5 FLUSH PASS. ALL PDK CURVES WERE SHIFTED WITH SGMA. CN WN FN COUN STAT /??MATCH5A. OUT /??MATCH5B.OUT $ : BP EXPLORATION (ALASKA) :N-26 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 14 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 2 3 4 5 6 7 8 9 10 11 1~. 13 14 GRCH PDK 68 1 GAPI BIF PDK 68 1 BKL PDK 68 1 CPS BKS PDK 68 1 CPS CSLS PDK 68 1 CU LS PDK 68 1 CPS SS PDK 68 1 CPS MSD PDK 68 1 CU RATO PDK 68 1 RBOR PDK 68 1 RICS PDK 68 1 RIN PDK 68 1 · SGMA PDK 68 1 CU SGMB PDK 68 1 CU 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 * DATA RECORD (TYPE# 0) Total Data Records: 84 966 BYTES * 56 Tape File Start Depth = 10680.000000 Tape File End Depth = 10010.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 63030 datums Tape Subfile: 6 172 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10104.0 PDK 10116.0 $ LOG HEADER DATA STOP DEPTH 10662.0 10674.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SBAR SINKER BAR PDK PDK-100 CCL CASING COLLAR LOC. TEMP TEMPERATURE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX; MATRIX DENSITY: HOLE CORRECTION (IN): 18-MAY-95 FSYS REV. J001 VER. 1.1 1044 18-MAY-95 10734.0 10680.0 10120.0 10680.0 1200.0 YES TOOL NUMBER 3913NA 2725XB 2324XA 2120XA .000 10810.0 .0 PRODUCED FLUIDS .00 .0 213.0 0 .0 .O00 .000 .000 .0 .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT): .0 .0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 500 FAR COUNT RATE HIGH SCALE (CPS): 3000 NEAR COUNT RATE LOW SCALE (CPS) : 0 NEAR COUNT RATE HIGH SCALE (CPS) : 60000 TOOL STANDOFF (IN): .0 REMARKS: BASE PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) :N-26 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 22 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CSLS PDK 68 1 CU 4 7 CSS PDK 68 1 CPS 4 8 ISS PDK 68 1 CPS 4 9 LS PDK 68 1 CPS 4 10 SS PDK 68 1 CPS 4 11 MON PDK 68 1 CPS 4 12 MSD PDK 68 1 CU 4 13 RATO PDK 68 1 4 14 RBOR PDK 68 1 4 15 RICS PDK 68 1 4 16 RIN PDK 68 1 4 17 SGMA PDK 68 1 CU 4 18 SGMB PDK 68 1 CU 4 19 SPD PDK 68 1 F/MN 4 20 TEN PDK 68 1 LB 4 21 SGNT PDK 68 1 CU 4 22 PHI PDK 68 1 PU-S 4 4 51 310 01 1 4 51 995 99 1 4 51 391 51 1 4 51 390 51 1 4 51 150 01 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 391 99 1 4 51 390 99 1 4 51 430 01 1 4 51 995 99 1 4 51 420 99 1 4 51 420 99 1 4 51 420 99 1 4 51 420 99 1 4 51 400 01 1 4 51 995 99 1 4 51 636 99 1 4 51 635 99 1 4 51 995 99 1 4 51 995 99 1 88 * DATA RECORD (TYPE# 0) 1018 BYTES * Total Data Records: 213 Tape File Start Depth = 10665.000000 Tape File End Depth = 10081.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 93984 datums Tape Subfile: 7 290 records... Minimum record length: Maximum record length: 62 bytes 1018 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10106.5 PDK 10118.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10665.0 10677.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SBAR SINKER BAR PDK PDK-100 CCL CASING COLLAR LOC. TEMP TEMPERATURE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 18-MAY-95 FSYS REV. J001 VER. 1.1 1342 18-MAY-95 10734.0 10680.0 10120.0 10680.0 1500.0 YES TOOL NUMBER 3913NA 2725XB 2324XA 2120XA .000 10810.0 .0 PRODUCED FLUIDS .00 .0 213.0 0 .0 .000 .000 .000 .0 .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): .0 .0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 500 FAR COUNT RATE HIGH SCALE (CPS) : 3000 NEAR COUNT RATE LOW SCALE (CPS) : 0 NEAR COUNT RATE HIGH SCALE (CPS) : 60000 TOOL STANDOFF (IN) : .0 REMARKS: 20 BBLS BORAX AWAY PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : N - 26 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 20 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CSLS PDK 68 1 CU 4 7 CSS PDK 68 1 CPS 4 8 ISS PDK 68 1 CPS 4 9 LS PDK 68 1 CPS 4 10 SS PDK 68 1 CPS 4 11 MON PDK 68 1 CPS 4 12 MSD PDK 68 1 CU 4 13 RATO PDK 68 1 4 14 RBOR PDK 68 1 4 15' RICS PDK 68 1 4 16 RIN PDK 68 1 4 17 SGMA PDK 68 1 CU 4 18 SGMB PDK 68 1 CU 4 19 SPD PDK 68 1 F/MN 4 20 TEN PDK 68 1 LB 4 GAPI 4 51 310 01 1 4 51 995 99 1 4 51 391 51 1 4 51 390 51 1 4 51 150 01 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 391 99 1 4 51 390 99 1 4 51 430 01 1 4 51 995 99 1 4 51 420 99 1 4 51 420 99 1 4 51 420 99 1 4 51 420 99 1 4 51 400 01 1 4 51 995 99 1 4 51 636 99 1 4 51 635 99 1 80 DATA RECORD (TYPE~/ 0) 1014 BYTES * Total Data Records: 199 Tape File Start Depth = 10680.000000 Tape File End Depth = 10085.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 113032 datums Tape Subfile: 8 276 records... Minimum record length: 44 bytes Maximum record length: 1014 bytes Tape Subfile 9 is type: LIS FILE HEADER FILE NUMBER: 8 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 3 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10102.0 PDK 10114.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): STOP DEPTH 10491.5 10503.5 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SBAR SINKER BAR PDK PDK-100 CCL CASING COLLAR LOC. TEMP TEMPERATURE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS· (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 18-MAY-95 FSYS REV. J001 VER. 1.1 1400 18-MAY-95 10734.0 10680.0 10120.0 10680.0 1500.0 YES TOOL NUMBER 3913NA 2725XB 2324XA 2120XA .000 10810.0 .0 PRODUCED FLUIDS .00 .0 213.0 0 .0 .000 .000 .000 .0 .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): .0 .0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 500 FAR COUNT RATE HIGH SCALE (CPS): 3000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 60000 TOOL STANDOFF (IN) : .0 REMARKS: 40 BBLS BORAX AWAY PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : N - 26 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 20 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CSLS PDK 68 1 CU 4 7 CSS PDK 68 1 CPS 4 8 ISS PDK 68 1 CPS 4 9 LS PDK 68 1 CPS 4 10 SS PDK 68 1 CPS 4 11 MON PDK 68 1 CPS 4 12 MSD PDK 68 1 CU 4 13 RATO PDK 68 1 4 14 RBOR PDK 68 1 4 15 RICS PDK 68 1 4 16 RIN PDK 68 1 4 17 SGMA PDK 68 1 CU 4 18 SGMB PDK 68 1 CU 4 19 SPD PDK 68 1 F/MN 4 20 TEN PDK 68 1 LB 4 4 51 310 01 1 4 51 995 99 1 4 51 391 51 1 4 51 390 51 1 4 51 150 01 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 391 99 1 4 51 390 99 1 4 51 430 01 1 4 51 995 99 1 4 51 420 99 1 4 51 420 99 1 4 51 420 99 1 4 51 420 99 1 4 51 400 01 1 4 51 995 99 1 4 51 636 99 1 4 51 635 99 1 80 * DATA RECORD (TYPE~ 0) 1014 BYTES * Total Data Records: 139 Tape File Start Depth = 10500.000000 Tape File End Depth = 10084.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 128950 datums Tape Subfile: 9 216 records... Minimum record length: Maximum record length: 44 bytes 1014 bytes Tape Subfile 10 is type: LIS FILE HEADER FILE NUMBER: 9 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 4 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10098.5 PDK 10110.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 10492.0 10504.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SBAR SINKER BAR PDK PDK-100 CCL CASING COLLAR LOC. -TEMP TEMPERATURE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX; MATRIX DENSITY: HOLE CORRECTION (IN): 18-MAY-95 FSYS REV. J001 VER. 1.1 1436 18-MAY-95 10734.0 10680.0 10120.0 10680.0 1500.0 YES TOOL NUMBER 3913NA 2725XB 2324XA 2120XA .000 10810.0 .0 PRODUCED FLUIDS .00 .0 213.0 0 .0 .000 .000 .000 .0 .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): .0 .0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 500 FAR COUNT RATE HIGH SCALE (CPS): 3000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 60000 TOOL STANDOFF (IN): .0 REMARKS: 60 BBLS BORAX AWAY PASS. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : N - 26 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 20 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CSLS PDK 68 1 CU 4 7 CSS PDK 68 1 CPS 4 8 ISS PDK 68 1 CPS 4 9 LS PDK 68 1 CPS 4 10 SS PDK 68 1 CPS 4 11 MON PDK 68 1 CPS 4 12 MSD PDK 68 1 CU 4 13 RATO PDK 68 1 4 14 RBOR PDK 68 1 4 15 RICS PDK 68 1 4 16 RIN PDK 68 1 4 17 SGMA PDK 68 1 CU 4 18 SGMB PDK 68 1 CU 4 19 SPD PDK 68 1 F/MN 4 20 TEN PDK 68 1 LB 4 4 51 310 01 1 4 51 995 99 1 4 51 391 51 1 4 51 390 51 1 4 51 150 01 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 391 99 1 4 51 390 99 1 4 51 430 01 1 4 51 995 99 1 4 51 420 99 1 4 51 420 99 1 4 51 420 99 1 4 51 420 99 1 4 51 400 01 1 4 51 995 99 1 4 51 636 99 1 4 51 635 99 1 80 * DATA RECORD (TYPE~ 0) 1014 BYTES * Total Data Records: 142 Tape File Start Depth = 10507.000000 Tape File End Depth = 10083.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 148670 datums Tape Subfile: 10 219 records... Minimum record length: Maximum record length: 44 bytes 1014 bytes Tape Subfile 11 is type: LIS FILE HEADER FILE NUMBER: 10 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 5 DEPTH INCREMENT: .2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10028.0 PDK 10040.0 $ LOG HEADER DATA STOP DEPTH 10495.0 10507.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING .SPEED (FPHR) : DEPTH CONTROL USED (YES/NO) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE SWIV SWIVEL SBAR SINKER BAR PDK PDK-100 CCL CASING COLLAR LOC. TEMP TEMPERATURE $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 18-MAY-95 FSYS REV. J001 VER. 1.1 1502 18-MAY-95 10734.0 10680.0 10120.0 10680.0 1500.0 YES TOOL NUMBER 3913NA 2725XB 2324XA 2120XA .000 10810.0 .0 PRODUCED FLUIDS .00 .0 213.0 0 .0 .000 .000 .000 .0 .00 .000 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 500 FAR COUNT RATE HIGH SCALE (CPS): 3000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 60000 TOOL STANDOFF (IN): .0 REMARKS: FLUSH PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : N - 26 : PRUDHOE BAY : NORTH SLOPE : ALASKA .0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 20 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR PDK 68 1 GAPI 4 2 BIF PDK 68 1 4 3 BKL PDK 68 1 CPS 4 4 BKS PDK 68 1 CPS 4 5 CCL PDK 68 1 4 6 CSLS PDK 68 1 CU 4 7 CSS PDK 68 1 CPS 4 8 ISS PDK 68 1 CPS 4 9 LS PDK 68 1 CPS 4 10 SS PDK 68 1 CPS 4 11 MON PDK 68 1 CPS 4 12 MSD PDK 68 1 CU 4 13 RATO PDK 68 1 4 14 RBOR PDK 68 1 4 15 RICS PDK 68 1 4 16 RIN PDK 68 1 4 17 SGMA PDK 68 1 CU 4 18 SGMB PDK 68 1 CU 4 19 SPD PDK 68 1 F/MN 4 20 TEN PDK 68 1 LB 4 4 51 310 01 1 4 51 995 99 1 4 51 391 51 1 4 51 390 51 1 4 51 150 01 1 4 51 995 99 1 4 51 995 99 1 4 51 995 99 1 4 51 391 99 1 4 51 390 99 1 4 51 430 01 1 4 51 995 99 1 4 51 420 99 1 4 51 420 99 1 4 51 420 99 1 4 51 420 99 1 4 51 400 01 1 4 51 995 99 1 4 51 636 99 1 4 51 635 99 1 80 DATA RECORD (TYFE~ 0) 1014 BYTES * Total Data Records: 166 Tape File Start Depth = 10507.000000 Tape File End Depth = 10011.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 170636 datums Tape Subfile: 11 243 records... Minimum record length: 44 bytes Maximum record length: 1014 bytes Tape Subfile 12 is type: LIS 95/ 6/ 1 01 **** REEL TRAILER **** 95/ 6/ 1 01 Tape Subfile: 12 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Thu 1 JUN 95 1:22p Elapsed execution time = 22.13 seconds. SYSTEM RETURN CODE = 0 Run 1' 23 - July - 1994 DIFLIAClCNIGR 10100 0810 WESTERN ATLAS Atlas Wireline Services Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD RUN 1 6245.00 J. DAHL SEE REMARKS N - 26 (21-7-11-13) 500292248300 BP EXPLORATION (ALASKA) INC. ATLAS WIRELINE SERVICES 28-JUL-94 RUN 2 RUN 3 8 liN 13E 2250 4710 73.90 72.40 43.40 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING 9.875 REMARKS: DIFL/AC/CN/GR. 10.750 3410.0 10820.0 LOGS WITNESSED BY: D. BOYER & D. BUMGARNER. CIRCULATION STOPPED AT 08:00, 23-JUL-94. GAMMA RAY LOGGED UP TO 8600' PER CUSTOMER'S REQUEST. TOOL STRING HEAVILY COVERED WITH MUD CAKE, WHICH PROBABLY INFLUENCED NEUTRON REPEAT PASS. NEUTRON LOG PARAMETERS: SANDSTONE MATRIX, BOREHOLE CORRECTION = 9.875", CHISM FILTERING IS ACTIVE, CASING CORRECTIONS OFF, SALINITY = 0.00 PPM. PER CLIENT'S REQUEST, BOREHOLE & TORNADO CHART CORREC- TIONS WERE APPLIED TO THE DIL DATA. THE DIL DATA WAS CORRECTED FOR BOREHOLE SIZE (9.875"). THE CORRECTED DATA WAS THEN USED IN THE ATLAS TORNADO CHART TO GET "RT" & "DI" CURVES. RT = TRUE FORMATION RESISTIVITY. DI = DEPTH OF INVASION. FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLE MAIN PASS All tool strings; depth shifted and clipped curves; hole data. DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR BCS DIL 2435 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA .5000 START DEPTH STOP DEPTH 8600.0 10746.0 10091.0 10781.0 10091.0 10810.0 10099.0 10753.0 GR (MEASURED DEPTH) BASELINE DEPTH 10096.0 10111.0 10116.5 10121.5 10122.0 10125.0 10132.5 10133.0 10138.5 10139.5 10141.5 10142.0 10144.5 10151.5 10156.5 10157.0 10157.5 10158.0 10168.5 10169.5 10175.5 10176.0 10178.5 10179.0 10183.0 10185.5 10186.0 10189.0 10190.5 10194.0 10200.5 10201.5 10202.0 10202.5 10206.0 10206.5 10221.5 10222.0 10224.0 10224.5 EQUIVALENT UNSHIFTED DEPTH LL8 ILD DT NPHI 10095.5 all runs merged; 10151.0 10185.5 10194.0 10205.5 10221.5 10224.0 10137.0 10140.0 10141.0 10143.5 10157.0 10157.5 10158.5 10159.0 10168.5 10169.0 10176.5 10177.0 10177.5 10178.0 10182.0 10185.5 10189.5 10191.0 10199.5 10200.5 10201.5 10117.0 10121.5 10133.0 10111.0 10117.0 10122.0 10125.0 10132.5 10140.0 10139.5 10151.0 10151.0 10185.5 10185.5 10194.0 10194.5 10202.5 10206.0 10206.5 10220.5 10222.5 10222.0 10224.5 no case 10226.0 10226.5 10228.5 10239.5 10241.5 10242.0 10248.0 10251.0 10251.5 10253.0 10256.5 10257.0 10271.5 10272.0 10275.0 10276.0 10276.5 10279.5 10283.0 10284.5 10285.5 10286.5 10287.5 10288.0 10291.0 10292.5 10301.0 10307.0 10307.5 10324.5 10329.5 10330.0 10355.0 10363.5 10366.5 10380.5 10387.0 10389.5 10392.5 10396.5 10401.0 10402.5 10406.0 10410.5 10411.0 10421.5 10422.5 10430.0 10436.0 10442.5 10443.5 10444.5 10449.5 10454.0 10460.0 10460.5 10461.5 10462.5 10466.0 10466.5 10226.0 10228.5 10251.0 10272.0 10282.5 10307.5 10324.5 10330.0 10363.5 10387.5 10393.0 10396.5 10411.5 10422.5 10436.5 10442.5 10445.0 10454.0 10224.5 10228.5 10242.0 10242.5 10256.5 10274.5 10275.5 10276.5 10279.5 10283.5 10284.5 10285.0 10285.5 10286.5 10289.5 10292.0 10301.0 10403.5 10407.0 10412.5 10436.0 10460.5 10461.0 10461.5 10462.0 10465.5 10466.5 10226.5 10250.5 10253.5 10257.5 10272.0 10307.5 10328.5 10355.0 10364.5 10389.5 10411.5 10421.5 10430.5 10443.5 10225.5 10238.5 10247.0 10251.0 10307.0 10324.5 10329.5 10366.0 10380.5 10402.0 10411.0 10422.5 10442.5 10450.0 10467.5 10468.5 10470.0 10472.5 10474.5 10475.0 10500.5 10554.5 10555.5 10576.0 10578.0 10578.5 10600.0 10616.5 10636.0 10643.5 10645.5 10647.5 10649.5 10651.5 10654.5 10655.5 10656.0 10662.0 10663.0 10669.5 10680.5 10681.0 10692.0 10701.5 10703.0 10707.5 10719.5 10735.0 10736.5 10737.5 10742.0 10742.5 10746.5 10760.0 10780.0 10781.5 10788.0 10796.5 10804.0 $ MERGED DATA SOURCE PBU TOOL CODE GR BCS DIL 2435 $ REMARKS: 10467.5 10468.0 10475.5 10576.0 10579.0 10600.5 10617.0 10636.5 10636.0 10645.5 10655.0 10656.0 10662.5 10663.5 10681.0 10702.0 10701.5 10703.0 10736.0 10743.5 10746.5 10761.0 10782.0 10782.5 10789.0 10798.0 10804.5 RUN NO. PASS NO. 1 5 1 5 1 5 1 5 10475.5 10555.0 10578.0 10600.0 10617.0 10649.5 10681.0 10702.0 10719.0 10737.0 10471.0 10474.0 10500.5 10556.0 10579.0 10600.5 10636.0 10643.0 10647.5 10651.0 10655.5 10663.0 10669.5 10681.5 10692.0 10701.5 10707.0 10720.0 10736.5 10742.0 MERGE TOP 8600.0 10091.0 10091.0 10099.0 OPEN HOLE MAIN PASS. MTEM, SP, TEND, & TENS WERE SHIFTED WITH LL8. ILM, RT, & DI WERE SHIFTED WITH ILD. FUCT & NUCT WERE SHIFTED WITH NPHI. MERGE BASE 10746.0 10781.0 10810.0 10753.0 CN WN FN COUN STAT ??MATCH1. OUT ?MATCH2. OUT ??MATCH3. OUT ?MATCH 4. OUT : BP EXPLORATION (ALASKA) : N - 26 (21-7-11-13) : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 14 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR BCS 68 1 GAPI 4 2 DT BCS 68 1 US/F 4 3 TEND BCS 68 1 LB 4 4 TENS BCS 68 1 LB 4 5 LL8 DIL 68 1 OHMM 4 6 ILM DIL 68 1 OHMM 4 7 ILD DIL 68 1 OHMM 4 8 RT DIL 68 1 OHMM 4 9 DI DIL 68 1 IN 4 10 SP DIL 68 1 MV 4 11 MTEM DIL 68 1 DEGF 4 12 NPHI 2435 68 1 PU-S 4 13 FUCT 2435 68 1 CPS 4 14 NUCT 2435 68 1 CPS 4 4 67 465 06 6 4 84 653 71 5 4 20 789 90 0 4 20 789 90 0 4 50 746 76 1 4 50 746 76 1 4 50 746 76 1 4 50 746 76 1 4 50 746 76 1 4 50 746 76 1 4 50 746 76 1 4 98 211 23 1 4 98 211 23 1 4 98 211 23 1 56 * DATA RECORD (TYPE# 0) 966 BYTES * Total Data Records: 282 Tape File Start Depth = 10832.000000 Tape File End Depth = 8584.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 67456 datums Tape Subfile: 2 536 records... Minimum record length: Maximum record length: 62 bytes 966 bytes Tape Subfile 3 is type: LIS TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY FILE HEADER FILE NUMBER: 2 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 for Sadlerochit run presented first (primary depth control string used to depth shift the Sadlerochit interval) followed by files for other main pass tool strings per run. RUN NUMBER: 1 1 5 .2500 VENDOR TOOL CODE START DEPTH STOP DEPTH GR 8600.0 10758.0 AC 10091.0 10793.0 DIFL 10091.0 10822.0 2435 10099.0 10765.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): 23-JUL-94 FSYS REV. J001 VER. 1.1 800 23-JUL-94 1416 23-JUL-94 10820.0 10813.0 10100.0 10810.0 1500.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS TEMP GR CN PCM KNJT KNJT AC DIFL $ CABLEHEAD TENSION MASS ISOLATION SUB TEMPERATURE GAMMA RAY COMPENSATED NEUTRON PULSE CODE MODULATOR KNUCKLE JOINT KNUCKLE JOINT BHC ACOUSTILOG DUAL INDUCTION TOOL NUMBER 3974XA 3967XA 2806XA 1309XA 2435XA 3506XA 3921NA 3921NA 1603MA/1609EB 1503XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 9.875 3410.0 .0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY ($): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): LSND 9.70 38.0 8.5 4.6 172.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: MAIN PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : N- 26 (21-7-11-13) : PRUDHOE BAY : NORTH SLOPE : ALASKA 1.430 .670 1.790 .000 1.750 .000 THERMAL SANDSTONE .00 9.875 1.5 77.0 172.0 71.0 .0 70.0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 20 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2o GR AC 68 1 GAPI AC AC 68 1 US/F CHT AC 68 1 LB TTEN AC 68 1 LB SPD AC 68 1 F/MN RFOC DIFL 68 1 OHMM RILM DIFL 68 1 OHMM RILD DIFL 68 1 OHMM RT DIFL 68 1 OHMM DI DIFL 68 1 IN CILD DIFL 68 1 MMHO VILD DIFL 68 1 MV VILM DIFL 68 1 MV SP DIFL 68 1 MV TEMP DIFL 68 1 DEGF CNC 2435 68 1 PU-S CNCF 2435 68 1 PU-S CN 2435 68 1 PU-L LSN 2435 68 1 CPS $$N Z435 68 1 CPS 4 4 06 969 49 6 4 4 48 852 89 1 4 4 95 558 30 1 4 4 95 558 30 1 4 4 61 094 30 1 4 4 27 515 24 6 4 4 06 213 78 0 4 4 04 903 06 0 4 4 04 903 06 0 4 4 06 213 78 0 4 4 34 704 23 6 4 4 04 522 10 6 4 4 04 522 10 6 4 4 53 419 67 0 4 4 40 467 34 0 4 4 98 211 23 1 4 4 98 211 23 1 4 4 52 326 75 5 4 4 84 023 70 1 4 4 83 368 34 1 80 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 750 Tape File Start Depth = 10832.000000 Tape File End Depth = 8584.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 188854 datums Tape Subfile: 3 831 records... Minimum record length: 44 bytes Maximum record length: 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY 1 1 4 .2500 VENDOR TOOL CODE START DEPTH GR 10100.0 AC 101O0.0 DIFL 10100.0 2435 10094.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): STOP DEPTH 10756.0 10791.0 10820.0 10763.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS TEMP GR CN PCM KNJT KNJT AC DIFL $ CABLEHEAD TENSION MASS ISOLATION SUB TEMPERATURE GAMMA RAY COMPENSATED NEUTRON PULSE CODE MODULATOR KNUCKLE JOINT KNUCKLE JOINT BHC ACOUSTILOG DUAL INDUCTION BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: YUUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 23-JUL-94 FSYS REV. J001 VER. 1.1 800 23-JUL-94 1331 23-JUL-94 10820.0 10813.0 10100.0 10810.0 1500.0 TOOL NUMBER 3974XA 3967XA 2806XA 1309XA 2435XA 3506XA 3921NA 3921NA 1603MA/1609EB 1503XA 9.875 3410.0 .0 LSND 9.70 38.0 8.5 4.6 172.0 1.430 77.0 MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: REPEAT PASS. $ CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : N - 26 (21-7-11-13) : PRUDHOE BAY : NORTH SLOPE : ALASKA .670 1.790 .000 1.750 .000 THERMAL SANDSTONE .00 9.875 1.5 172.0 71.0 .0 70.0 .0 * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 20 Curves: Name Tool Code Samples Units 1 GR AC 68 1 GAPI 2 AC AC 68 1 US/F 3 CHT AC 68 1 LB 4 TTEN AC 68 1 LB 5 SPD AC 68 1 F/MN 6 RFOC DIFL 68 1 OHMM 7 RILM DIFL 68 1 OHMM 8 RILD DIFL 68 1 OHMM 9 RT DIFL 68 1 OHMM 10 DI DIFL 68 1 IN 11 CILD DIFL 68 1 MMHO 12 VILD DIFL 68 1 MV 13 VILM DIFL 68 1 MV 14 SP DIFL 68 1 MV 15 TEMP DIFL 68 1 DEGF 16 CNC 2435 68 1 PU-S 17 CNCF 2435 68 1 PU-S 18 CN 2435 68 1 PU-L 19 LSN 2435 68 1 CPS 20 SSN 2435 68 1 CPS API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 06 969 49 6 4 4 48 852 89 1 4 4 95 558 30 1 4 4 95 558 30 1 4 4 61 094 30 1 4 4 27 515 24 6 4 4 06 213 78 0 4 4 04 903 06 0 4 4 04 903 06 0 4 4 06 213 78 0 4 4 34 704 23 6 4 4 04 522 10 6 4 4 04 522 10 6 4 4 53 419 67 0 4 4 40 467 34 0 4 4 98 211 23 1 4 4 98 211 23 1 4 4 52 326 75 5 4 4 84 023 70 1 4 4 83 368 34 1 80 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 246 Tape File Start Depth = 10830.000000 Tape File End Depth = 10094.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 129302 datums Tape Subfile: 4 325 records... Minimum record length: 44 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: LIS 94/ 7/28 01 **** REEL TRAILER **** 94/ 7/29 01 Tape Subfile: 5 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Fri 29 JLY 94 8:19a Elapsed execution time = 17.68 seconds. SYSTEM RETURN CODE = 0