Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout202-159MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Monday, June 20, 2022
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Matt Herrera
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
Hilcorp North Slope, LLC
PSI-10
PRUDHOE BAY UNIT PSI-10
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 06/20/2022
PSI-10
50-029-23110-00-00
202-159-0
W
SPT
8056
2021590 2014
2184 2186 2186 2187
161 517 517 520
4YRTST P
Matt Herrera
6/4/2022
4 Year MIT-IA Performed to 2750 PSI Per Operations
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:PRUDHOE BAY UNIT PSI-10
Inspection Date:
Tubing
OA
Packer Depth
35 2754 2739 2737IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitMFH220604121342
BBL Pumped:4.6 BBL Returned:4.1
Monday, June 20, 2022 Page 1 of 1
9
9
9
9
9
9
9 9
9
9James B. Regg Digitally signed by James B. Regg
Date: 2022.06.20 16:49:03 -08'00'
• •
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Tuesday,June 05,2018
TO: Jim Regg f�e_fet cv 113j,S SUBJECT: Mechanical Integrity Tests
P.I.Supervisor
BP EXPLORATION(ALASKA)INC.
PSI-10
FROM: Austin McLeod PRUDHOE BAY UNIT PSI-10 I
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I.Supry S50--
NON-CONFIDENTIAL Comm
Well Name PRUDHOE BAY UNIT PSI-10 API Well Number 50-029-23110-00-00 Inspector Name: Austin McLeod
Permit Number: 202-159-0 Inspection Date: 6/2/2018 '
Insp Num: mitSAM180602144039
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
i 3
Well PSI-10 Typeppsi Inj W '!TVD 8056 - Tubing 553 - 553 • 553 554 ' _
Pumped: .3 BBL Returned: 3.5 OA 96 355 350 ' 349
j
PTD 2021590 'Type Test SPT Test 2014 IA 340 2500 2487 2484
BBL PumP
Interval 4YRTST P/F P
Notes: MIT-IA
SCANNED JUN 2 '2 LU a
Tuesday,June 05,2018 Page I of 1
) )
Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
Q Ö:J... - [51-well History File Identifier
Organizing (done)
0 Two-sided 1111111111111111111
0 Rescan Needed 1111111111111111111
RESCAN
D,TAL DATA
...¡f Diskettes, No.3
0 Other, No/Type:
OVERSIZED (Scannable)
0 Maps:
0 Color Items:
0 Greyscale Items:
0 Other Items Scannable by
a Large Scanner
0 Poor Quality Originals:
OVERSIZED (Non-Scannable)
0 Other:
0 Logs of various kinds:
NOTES:
Scanning Preparation
:?)
x 30 = ;°
0 Other:: ~I
DateJ I,ll. ~11~11¡I/IIII~f
Date 1/17 'Dtf Isl vt1 XJ
+ 7 = TQTAL PAGES 29
6Ca~~nt ir t inc~~a~~r s VtiP
, 7 111111111111\\ 11111
BY:
Helen ~
Project Proofing
BY:
Helen Marìa
BY:
Helen Maria
Production Scanning
Stage 1 Page Count from Scanned File: / () 0 (Caunt daes include caver sheet)
Page Count Matches Number in Scanning Preparation: c/ YES.
Helen~ Date: I 7
If NO in stage 1, page(s) discrepancies were found: YES
BY:
NO
04-/SI WI P
Stage 1
NO
BY:
Helen Maria
Date:
/s/
I r \1
Scanning is complete at this point unless rescanníng is required.
ReScanned
1111111111111111111
BY:
Helen Maria
Date:
/s/
Comments about this file:
Quality Checked
1111111\1\111111111
8/24/2004 Well History File Cover Page.doc
• •
bp
BP Exploration (Alaska) Inc. ' �
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
'art
December 21, 2010 s ..- JAN
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission
333 West 7 Avenue #19)xV Oat. 2, Gov Coos. C - fission
Anchorage, Alaska 99501 Incir
Subject: Corrosion Inhibitor Treatments of GPB PSI ONO / 59
Dear Mr. Maunder, PS 1 "� 1
Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB PSI
that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Gerald
Murphy, at 659 -5102.
Sincerely,
Torin Roschinger
BPXA, Well Integrity Coordinator
• •
BP Exploration Alaska Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off
Report of Sundry Operations (10 -404)
Date: 12/21/10
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD # API # cement pumped cement _ date inhibitor sealant date
ft bbls ft na gal
PSI - 2021450 50029231040000 NA 1 NA 5.10 10/25/2010
PS1-05 2031390 50029231740000 NA 1 NA 5.95 10/24/2010
PSI -06 2020790 50029230820000 NA 12.3 NA 45.90 10/25/2010
PSI -07 2031480 50029231770000 1.2 NA 6.80 10/24/2010
PS1-08 2021720 50029231140000 NA 1.3 NA 6.80 10/23/2010
PSI -09 2021240 50029230950000 NA 1.9 NA 12.80 10/23/2010
PSI -10 2021590 50029231100000 + ! NA 0.7 NA 3.40 10/23/2010
(..17 F ,
P
4
•
MEMORANDUM
To: Jim Regg ~~~c -7~~~(lo
P.I. Supervisor 7
FROM: Jeff Jones
Petroleum Inspector
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Monday, July 26, 2010
SUBJECT: Mechanical Integrity Tests
BP EXPLORATION(ALASKA)INC
PSI-10
PRUDHOE BAY UNIT PSI-] 0
Src: Inspector
NON-CONFIDENTIAL
Reviewed By:
P.I. Suprv ~j ~~
Comm
Well Name: PRUDHOE BAY UNIT PSI-10
Insp Num: mitJJ10072117s827
Rel Insp Num: API Well Number: 50-029-231 ]0-00-00
Permit Number: 202-159-0 Inspector Name: Jeff Jones
Inspection Date: 7/4/2010
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well PSI-lo ~ Type Inj. ~' TVD I sos6 - IA o zsoo ~ zass zaso
P.T.D zozts9o TypeTest sPT Test psi zota OA o zso ~ zso zso
Interval aYRTST p~ P ~ Tubing vso Ipso ' lzbo Iz6o
Notes: 3.7 BBLS methanol pumped. 1 well inspected; no exceptions noted. ,
Monday, July 26, 2010 Page 1 of 1
MEMORANDUM
e
State of Alaska e
Alaska Oil and Gas Conservation Commission
TO:
Jim Regg
P.I. Supervisor
DATE: Wednesday, July 05,2006
SUBJECT: Mechanical Integrity Tests
BP EXPLORATION (ALASKA) INC
PSI-IO
PRUDHOE BAY UNIT PSI-IO
.tI'
~O'}
\6q
FROM:
Lou Grimaldi
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I. Suprv :::þ?
Comm
Well Name: PRUDHOE BAY UNIT PSI-IO API Well Number 50-029-23 110-00-00 Inspector Name: Lou Grimaldi
Insp Num: mitLG060701122406 Permit Number: 202- 159-0 Inspection Date: 7/I/2006
Rei Insp N urn
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well 1 PSI-IO ¡Type Inj. ! W ! TVD I 8056 ! IA i 320 i 2200 2180 I 2155 I 2150 I
I I ¡
P.T. i 2021590 ì I; ! 2200 lOA I 810 i 1000 i 1000 i 1000 : 980
¡TypeTest . SPT I Test psi i
Interval 4YRTST P/F P Tubing! 1600 ! 1700 i 1700 i 1700 I 1650
Notes 3.0 bbl's pumped, test held for additional 15 minutes due to equal pressure loss in ist and 2nd intervals. Test "OK". /
/
NON-CONFIDENTIAL
Wednesday, July 05, 2006
Page I of I
e
e
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs _Inserts\Microfilm _ Marlœr.doc
Schlumberger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Well
MPC-41
MPG-05
MPL-33
P-06A
DS 02-25
U.:S. 09-10
B-20
Y-25
PSI-10
P-26
02-14A
F-12
04·35
~5-09A
15-09A
5-09A
J-13
D.S. 09-29
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
Job#
10889195
10715440
11058514
11132061
10987525
11058237
10980591
10928605
10715447
10928634
11075901
NA
10889172
10889183
NA
10919942
10877750
10980596
~NE[) OCT 3 12DD5
Log Description
SBH SURVEY
MPSP INJECTION PROFILE
INJECTION PROFILE
LDL
INJECTION PROFILE
INJECTION PROFILE ~'"-~V\~~ ~
LDL
MEM PPROF W/DEFT
MPSP IPROF & WARMABACK
MEM PPROF W/DEFT
MEM PPROF & IPROF
LDL
SBHP SURVEY
OIL PHASE BOTTOM HOLE SAMPLE
OIL PHASE BOTTOM HOLE SAMPLE
OIL PHASE BOTTOM HOLE SAMPLE
LDL
PPROF W/DEFT
c
o&-~~-
Date
12/24/04
11/09/04
06/03/05
10/12/05
06/24/05
08/16/05
08/05/05
11/20/04
01/01/05
06/02/05
07109/05
06/03/05
10/10/04
11/04/04
02/02/05
02/13/05
06/29/04
08/10/05
10/18/05
NO. 3503
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Helen Warman
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
BL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Color
CD
--
Alaska Data & Consulting Services
2525 Gambell Street, Suite 40
Anchorage, AK 99503- 8
ATTN: Beth
Received by:
, ðJh-d:
2 .t\}'~~~~ b~,~.'4~~.~~JJ2.
}e:( ~J~\Î ;tc)~
DATA SUBMITTAL COMPLIANCE REPORT
10/29/2004
Permit to Drill 2021590
Well Name/No. PRUDHOE BAY UNIT PSI-10
Operator BP EXPLORATION (ALASKA) INC
Jf~¿ t~ ~~~
API No. 50-029-23110-00-00
MD 11809 r- TVD 8594
,..
Completion Date 10/14/2002 ..~ Completion Status 1WINJ
Current Status 1WINJ
£UI-C Y )~
REQUIRED INFORMATION
Mud Log No
Samples No
Directional Survey~
./
DATA INFORMATION
Types Electric or Other Logs Run: MWD, GR, RES, USIT, NEU, LWD, BHC Sonic
Well Log Information:
(data taken from Logs Portion of Master Well Data Maint)
Log/ Electr
Data Digital Dataset Log Log Run Interval OH/
Type ....JVIed/Frmt Number Name Scale Media No Start Stop CH Received Comments
~D -11'674 LiC Vorifiootio-.1" c.,l. t u.J V\. &.( CJ>I Y' ..sCola r<~1' 1 112 11771 Open 3/26/2003
~ Directional Survey 0 11809 Open 1 0/9/2002
~. Temperature \. '^'" ,or) 5 Blu final 8634 11711 Case 11/1/2002 With Jewelry
~ -sc)nic M.D 25 Blu 10954 11800 Case 11/8/2002
u.eg Sonic '-. V-"'''' 5 Col 8760 11432 Case 10/1/2002
~. Directional Survey 0 11809 Open 10/9/2002 MWD
f>IJ 0 Directional Survey 0 11809 Open 10/9/2002 MWD
~ 0 Directional Survey 0 908 Open 10/9/2002 GYRO
-.J.Dg' "-Sonic S S "" 1\ 25 Blu 10954 11800 Case 11/8/2002
A ~ment Evaluation 5 Col Field 8760 11432 Case 10/1/2002
c.6Y' 0 Directional Survey 0 11809 Open 10/9/2002
~ Directional Survey 0 908 Open 1 0/9/2002 GYRO
Log Pressure 5 Blu final 8634 11711 Case 11/1/2002 With Jewelry
vÆó C ~89 See Notes 10954 11800 Case 11/8/2002 LDWG edit of BHC log
~ LIS Verification 112 11771 Open 3/26/2003
,ED C Tf ~ 2190 LIS Verification 1-5 111 11809 Case 1 0/27/2003
ED C Pdf 12190 Rate of Penetration 25 1-5 111 11809 Case 1 0/27/2003 ROP, DGR, EWR- MWD
/' ED C Pdf J2190 Induction/Resistivity 25 1-5 111 11809 Case 1 0/27/2003 ROP, DGR, EWR - MWD
ED C Pdf 12190 Density 25 1-5 111 11809 Case 1 0/27/2003 DGR, SLD, CNP - MWD
./ ED C Pdf c.., 2190 Neutron 25 1-5 111 11809 Case 1 0/27/2003 DGR, SLD, CNP - MWD
Permit to Drill 2021590
MD 11809
Well Cores/Samples Information:
TVD 8594
Name
Well Cored?
ADDITIONAL INFORMATION
v(&)
Chips Received? ~ Y / N
Analysis
Received?
Comments:
~
Compliance Reviewed By:
DATA SUBMITTAL COMPLIANCE REPORT
10/29/2004
Well Name/No. PRUDHOE BA V UNIT PSI-10
Operator BP EXPLORATION (ALASKA) INC
API No. 50-029-23110-00-00
Completion Date 10/14/2002
Completion Status 1WINJ
Interval
Start Stop
Sent
Received
Daily History Received?
Formation Tops
.L
Current Status 1WINJ
Sample
Set
Number Comments
@
(J¡IN
Date:
UIC V
/¡- tV"", ~y
)
J
§o()-15¡
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard Okland
333 West 7th Avenue, Suite 100
Alnchorage,AJaska 99501
October 17, 2003
RE: MWD Formation Evaluation Logs: PSI-10,
AK-MW-22135
PSI-tO:
Digital Log Images
50-029-23110-00
I CD Rom 1 @.l '10
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE
TRANSMITTAL LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, AJaska 99518
BP Exploration (AJaska) Inc.
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Alnchorage, AJaska 99508
Date:
Signed~(:\~ ~\.~
() ('T f') '7
\,Ji.." ¡ r..... í
~~~~f\~~
)
')
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
33 3 West 7th Avenue, Suite 100
Anchorage, Alaska
March 21, 2003
RE: MWD Formation Evaluation Logs PSI-10,
AK-MW-22135
1 LDWG formatted Disc with verification listing.
llPI#: 50-029-23110-00
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL
LETTER TO THE ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Rob Kalish
6900 Arctic Blvd.
Anchorage, Alaska 99518
BP Exploration (Alaska) Inc.
Petro-Technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date:
~ì
S¡gneC ~ ;;¡¿ßp:J
RECEIVED
MAR 2 6 2003
AI_a on & Gas Cons. Commiteion
Anchorage
aœ-)59
/ II£; Ie¡
Shared Services Drilling
"'-'\
C?/ 0:::3, - ¡ t::Q
Handover Fo'rm
To Drilling:
Well: PSI-10
To Production: XXXXX
AFE Number: PBD4P1924
Well Information
Pre Rig Work Cost:. $
API Number: 50-029-23110
SITP: 0
Production Csg Pressure: 0
Surface Csg Pressure: 0
BHP:
Depth:8594
(TVD)
Freeze Protection
Fluid: Weight:
Diesel 6.8
Date:9/2I2002
Date:9/2I2002
Date: 9/212002
Date:9/2I2002
Surface x Int. Annulus:
Inj. Well:
Inj. Well:
Frz Prot?
yes
Depth:
0-2200
Amount:
138 bbl
Annulus:
Annulus:
Tubing:
Tubing:
Tree Type: Inlay
Top of Fill or Junk:
BPV Installed (Yes/No): Yes
Dummy GLVls (Yes/No): No
New Casing String Installed During this Workover (Yes/No):
Well bore Fluids
Fluid Type: Weight:
nie~el 6.8
KCI Rrine 8.5
niesel 6.8
KCI Rrine 8.5
Downhole Information
PBTD: 11.7221
Last TD tag Date: 8/29/2002
Downhole Plugs (Yes/No):
SSSV and Insert (Yes/No):
Yes
No
Yes
SPF:
Depth:
O-??OO 1 :
??00-11 ,?OO 2:
O-??OO 3:
??00-11 ,?OO 4:
Perf Intervals
From:
Fluid Loss During Workover
Fluid Type: Weight: Amounts (bbls):
To:
Perfs Squeezed:
No
* General Information
-~ -- \VA!l-cW3~dril~d-tAM~-41J&ßQI.--A"1~I--I~-r~i-.--with-t4\P::=' 11 ,~-1-A1. and-Iandina
~nlh'r :It 11, 7~41. Th~ w~1I wa~ I!nmpl~t~d with 7 !?alA II tubi~q frnm ~..rf:ll!~ with
W. -=~ :I' 11 ,2AAI, th~ PKR :It 11,2441. Th~ tuhina :lnd :lnnulu~ w~r~ t~~t~d tn 4nnn
p~i. Th~ 7 !?alA II X Q !?alA II :lnnulu~ i~ fr~~7~ prnt~l!t~d tn ~~nnl with di~~~1 :lnd
I!nrrn~inn inhibit~d K~. "rin~ tn 11 ,2nnl.
* Fish (attach diagram of fish), tight spots, leaks, etc. Attach Tubing and Completion Detail Forms.
Completion Equipment
MfgrlType/Size/Dummy or Orifice/Latch
SSSV: Camco nR Nipple for i~ection valve
Land Nipple:
GLM:
GLM:
GLM:
GLM:
GLM:
GLM:
GLM:
GLM:
GLM:
GLM:
GLM:
GLM:
X Nipple:
Sldg Sleeve:
PBR/SBR:
Packer:
X Nipple: R NIPPI F 6.'76 In
WLEG:
Blast Ring
Packer:
X Nipple:
NoGo Nipple:
Shear Sub:
WLEG: WI FG 7"
Drlg Rep: Rill nAr-kAr
Title: nrillin~ ~ltpArvi~nr
Revised: 10/25/95 by SRW
Top (md)
It
'19'
11 ,179
PRR
RAKFR T1 X 9 5/811 ~ARI -3 pkr with '01 PRR
R NIPPI F. 5.963 In
RN NO GO NIPPI F. 5.7711 In
11 '03
11'44
11'63
11'75
11 'BB
Date: 9/03/?00?
Production Rep:
TitlA:
Date:
)
')
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed:
ADD PERFS
2. Name of Operator
BP Exploration (Alaska), Inc.
3. Address
P. O. Box 196612
Anchorage, AK 99519-6612
4. Location of well at surface
Operation shutdown-
Pull tubing -
Stimulate -
Alter casing -
5. Type of Well:
Development -
Exploratory-
Stratigraphic-
Service_X
1394'FNL,4322'FEL,Sec. 15,T11N, R15E,UM
At top of productive interval
129' FNL,2073' FEL, Sec.09,T11N, R15E,UM
At effective depth
69'FNL,2099'FEL,Sec.09,T11N, R15E,UM
At total depth
45'FNL,2109'FEL,Sec.09, T11N,R15E,UM
12. Present well condition summary
Total depth: measured
true vertical
(asp's 708081, 5966190)
(asp's 704857, 5972649)
(asp's 704829, 5972709)
(asp's 704819, 5972732)
11809 feet
8594 feet
Plugs (measured)
Plugging - Perforate _X
Repair well - Other -
6. Datum elevation (OF or KB feet)
RKB 50 feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
PSI-10
9. Permit number / approval number
202-159
10. API number
50-029-23110-00
11. Field / Pool
Prudhoe Bay Oil Pool
Effective depth: measured 11718 feet Junk (measured)
true vertical 8507 feet
Casing Length Size Cemented Measured Depth True Vertical Depth
Conductor 73' 20" 260 sx Arctic Set (aprox) 108' 108'
Surface 6032' 13-3/8" 1329 sx AS III Lite, 601 6067' 4678'
sx Class 'G'
Intermediate 1140 l' 9-5/8" 618 sx Class 'G' 11432' 8234'
Liner 489' 7" 145 sx Class 'G' 11320' - 11809' 8127' - 8594'
Perforation depth:
measured Open Perfs 11488'-11548', 11562'-11586', 11620'-11666', 11688'-117¡ E eEl V E D
DEC 192002
true vertical Open Perfs 8287'-8344', 8358'-8381 " 8413'-8457', 8478'-8498'
Alaska Oil & Gas Cons. Commission
Tubing (size, grade, and measured depth) 7-5/8" 29.7# L-80 @ 2191' MD. 7-5/8" x 7" XO @ 2191'. 7" x 7-5/8" XO @ 21Bg~orage
7-5/8" 29.7# L-80 @ 11168' MD. 7-5/8" x 7" XO @ 11168'. 7" 26# L-80 @ 11288'.
Packers & SSSV (type & measured depth) 7" X 9-5/8" Baker SABL-3 Packer @ 11244' MD.
7" X 9-5/8" BKR ZXP LNR TOP PKR W/ TIEBACK SLV @ 11327'.
13. Stimulation or cement squeeze summary
Intervals treated (measured) (see attached)
Treatment description including volumes used and final pressure
14. Representative Daily AveraQe Production or Injection Data
Oil-Bbl Gas-Mct Water-Bbl
107,768
Prior to well operation
11/17/2002
Subsequent to operation 11/28/2002
15. Attachments
Copies of Logs and Surveys run -
Daily Report of Well Operations - Oil - Gas -
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
A~~J~
DeWayne R. Schnorr
7" Camco DB NIP @ 2192'.
Casing Pressure
Tubing Pressure
2248
2157
109,064
16. Status of well classification as:
Title: Technical Assistant
Form 10-404 Rev 06/15/88 .
Suspended -
Service WATER INJECTION
Date December 05.2002
Prepared by DeWayne R. Schnorr 564-51~~,~
SUBMIT IN DUPLICATE ~
)
')
PSI-10
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
11/01/2002
11 /02/2002
11 /04/2002
11/24/2002
12/02/2002
12/04/2002
NEW WELL POST: AC-FLUID LEVEL
NEW WELL POST: AC-MITIA
NEW WELL POST: AC-MONITOR
NEW WELL POST: PERFORATING
NEW WELL POST: SSSV C/O OR STROKE
TESTEVENT --- IN] PRESS, PSI: 1,956 TYPE: PW VOL: 103,582 BWPD
EVENT SUMMARY
11/01/02 T/I/O = 900/20/360, IA FL @ SURFACE POST INJECTION START-UP.
11/02/02 T/I/0=850/0+/350 MITIA TO 2100 PSI. PASSED (AOGCC WITNESSED, JEFF
JONES). INITIAL IA FL AT SURFACE. MITIA LOST 5 PSI IN THE FIRST 15
MINUTES AND 5 PSI IN THE SECOND 15 MINUTES FOR A TOTAL OF 10 PSI IN
30 MINUTES. PUMPED 3 BBLS OF 60/40 METHANOL DOWN THE IA. FINAL
WHp1s = 850/300/350.
11/04/02 T/I/O= NA/240/70 (POST MITIA)
11/24/02 PERFORATED 114881 - 115481 AND 115621 - 115861 WITH 33/811 HSD GUNS 6
SPF POWERJET. RDMO. WELL READY TO INJECT.
12/02/02 SET 711 A-1 ISSSV (WATER INJECTION VALVE) W/ DB-6 LOCK. (SER # HTS-639,
4911 OAL.)
NO CLOSURE TEST DUE TO WELL ON VAC., TATTLE TAIL IN RUNNING TOOL
INDICATES GOOD SET. ****RETURNED WELL FOR INJECTION*****
12/04/02 TESTEVENT --- IN] PRESS, PSI: 1,956 TYPE: PW VOL: 103,582 BWPD.
Fluids Pumped
BBLS
1
4
5
DIESEL FOR SURFACE PRESSURE TEST (1 TESTS)
60/40 METHANOL WATER
TOTAL
ADD PERFS
11/24/2002
THE FOLLOWING INTERVALS WERE PERFORATED USING 3-3/811 3406-PJ, 6 SPF, 60
DEGREE PHASING, RANDOM ORIENTATION.
114881 - 115481
11562' - 11586'
Page 1
Se_lumblrger
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
A TTN: Beth
Well Job# Log Description Date
PSI-09 ~~-la4 22346 OH EDIT DSI (PDC) 07/18/02
PSI-09 J" 22346 DSI 07/18/02
PSI-09 22346 DSI DEL TA~T COMP 07/18/02
PSI-10 d~-15, 22423 OH EDIT BHC (PDC) 08/28/02
PSI-10 J, 22423 SONIC LOG 08/28/02
PSI-10 22423 SONIC LOG SSTVD 08/28/02
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
f~ECEiVØ.'D
f~OV 08 2002
Date Delivered:
Ala&tt8 ûr~ ü; GZi3 vunfj;, L;¡::.mn~~5ioH
M,d1~g{;
Blueline
11/04/02
NO. 2528
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
F'eld: Prudhoe Bay
Sepia
Color
Prints
~
CD
1
1
1
1
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
A lchorage, AK 99503-5711
A-rN: Beth
Roceive~ GJ)oo~
1. Status of Well
0 Oil 0 Gas 0 Suspended 0 Abandoned fiI Service
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
3886' NSL, 4322' WEL, SEC. 15, T11 N, R15E, UMrG{;¡~iF¡:.Êfi6¡rt
At top of productive interval .1 DATE ¡
5151' NSL, 2073' WEL, SEC. 09, T11N, R15E, UM ¿ jb, ;1'1";.021;
5~~~~~k~~~t~09' WEL, SEC. 09, T11N, R15E, UM ! "~~..~:~~=!
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease bðstg11atiön"arfd Serial No.
KBE = 50.45' ADL 034631
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband.
8/10/2002 8/27/2002 1 0/14/2002
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
11809 8594 FT 11718 8507 FT fiI Yes 0 No
22. Type Electric or Other Logs Run
MWD, GR, RES, USIT, NEU, LWD,
v
23.
CASING
SIZE
34" X 20"
13-3/8"
9-5/8"
WT. PER FT.
91.51#
68#
47#
26#
7"
)
)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Classification of Service Well
Gas Cap Injection
7. Permit Number
202-159
8. API Number
50- 029-2311 0-00
9. Unit or Lease Name
Prudhoe Bay Unit
10. Well Number
PSI.10
11. Field and Pool
Prudhoe Bay Field / Prudhoe Bay Pool
15. Water depth, if offshore 16. No. of Completions
N/A MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
(Nipple) 2192' MD 1900' (Approx.)
GRADE
H-40
L-80
L-80
L-80
BHC Sonic
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH HOLE
Top BOTTOM SIZE CEMENTING RECORD
Surface 73' 42" ,260 sx Arctic Set (Approx.)
35' 6067' 16" 1348 sx Articset III Lite, 600 sx 'G'
311 11432' 12-1/4" 618 sx Class 'G'
11320' 11809' 8-1/2" 146 sx Class IGI
AMOUNT PUllED
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
3-3/8" Gun Diameter, 6 spf
MD TVD
11620' - 11666' 8413' - 8457'
11688' - 117081 84781 - 8498'
Flow Tubing Casing Pressure CALCULATED
Press. 24-HoUR RATE
28. CORE DATAn[ C [ , V [ D
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core <ßp .
27.
Date First Production
October 28, 2002
Date of Test Hours Tested
No core samples were taken.
Form 10-407 Rev. 07-01-80
25.
TUSING RECORD
DEPTH SET (MD)
PACKER SET (MD)
SIZE
7-5/8",29.7#, L-80 x
7",26#, L-80 11288'
ACID, FRACTURE, CEMENT SaUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protect with 138 Bbls of Diesel
MD
TVD
11243'
26.
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
Water Injection
PRODUCTION FOR Oll-BSl
TEST PERIOD
GAs-McF
WATER-Bsl
CHOKE SIZE
GAS-Oil RATIO
Oll-Bsl
GAs-McF
WATER-BsL
Oil GRAVITY-API (CORR)
RBDMS 8Fl
NOV '8
NOV 0 5 2002
Alaska Oil & Gas Cons. Commission
Anchorage
e,f
Submit In Duplicate
..
29.
')
30.
Geologic Markers
Measured
Depth
Marker Name
SV4
SV3
SV2
SV1
Ugnu 4
Ugnu 4A
Ugnu 3
Ugnu 1
West Sak 2
West Sak 1
CM3
CM2
CM1
HRZ
Base HRZ / LCU / Top Zone 3
Zone 2C
Zone 28
Zone 2A
Zone 1 B
Kavik
31. List of Attachments:
Formation Tests
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered and
gravity, GOR, and time of each phase.
4195'
4840'
51661
5802'
6600'
6683'
69861
8038'
9020'
9358'
96961
10674'
10813'
11266'
11488'
11491'
11529'
11633'
11666'
8569'
3513'
3922'
4123'
45101
5016'
5069'
5256'
5874'
6451'
66481
6847'
7551'
7667'
8077'
8287'
8290'
8326'
84261
8457'
85691
RECEIVED
NOV 0 5 2002
Alaska on & Gas Gons. Commission
Anchorage
Summary of Daily Drilling Reports and Post Rig Summary, Surveys
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Tenie Hubble ~QAJIi¿ ~ TrtJe Technical Assistant Date II rO<.f .o^-
PSI-10 202-159 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. / Approval No. Drilling Engineer: Walter Quay, 564-4178
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Legal Name: PSI-10
Common Name: PSI-10
Test Date
8/18/2002
8/26/2002
FIT
FIT
Test Type
Test Depth (TMD)
6,077.0 (ft)
11,432.0 (ft)
BP
Leak-Off Test Summary
Test Depth (TVD)
4,684.0 (ft)
8,233.0 (ft)
AMW
9.00 (ppg)
9.00 (ppg)
Surface Pressure
730 (psi)
429 (psi)
Leak Off Pressure (BHP)
2,920 (psi)
4,278 (psi)
Page 1 of 1
EMW
12.00 (ppg)
10.00 (ppg)
",-,"
--
Printed: 9/4/2002 10:55:30 AM
)
}
BP
Qp~ratiøl1$..SI.l~~~rY....R.øþQrt
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
PSI-10
PSI-10
DRILL +COMPLETE
NABORS
NABORS 27ES
HöUrs Task .Còdé NPT Phase
8/9/2002
10:00 - 00:00
14.00 MOB
PRE
P
8/10/2002
3.00 RIGU P
PRE
00:00 - 03:00
03:00 - 04:30 1.50 BOPSUR P SURF
04:30 - 06:00 1.50 BOPSUR P SURF
06:00 - 07:00 1.00 BOPSURP SURF
07:00 - 12:00 5.00 DRILL P SURF
12:00 - 16:30 4.50 DRILL P SURF
16:30 - 17:30 1.00 DRILL P SURF
17:30 - 18:00 0.50 DRILL P SURF
18:00 - 00:00 6.00 DRILL P SURF
8/11/2002 00:00 - 05:00 5.00 DRILL P SURF
05:00 - 07:30 2.50 DRILL N RREP SURF
07:30 - 09:00 1.50 DRILL N RREP SURF
09:00 - 00:00 15.00 DRILL N RREP SURF
8/12/2002 00:00 - 17:00 17.00 DRILL N RREP SURF
17:00 - 20:00 3.00 DRILL N RREP SURF
20:00 - 00:00 4.00 DRILL P SURF
8/13/2002 00:00 - 23:00 23.00 DRILL P SURF
23:00 - 00:00 1.00 DRILL P SURF
8/14/2002 00:00 - 00:30 0.50 DRILL P SURF
00:30 - 03:00 2.50 DRILL P SURF
03:00 - 03:30 0.50 DRILL P SURF
03:30 - 05:30 2.00 DRILL P SURF
05:30 - 06:30 1.00 DRILL P SURF
06:30 - 07:30 1.00 DRILL P SURF
07:30 - 00:00 16.50 DRILL P SURF
8/15/2002 00:00 - 10:30 10.50 DRILL P SURF
10:30 - 13:00 2.50 DRILL P SURF
Start: 8/9/2002
Rig Release: 9/3/2002
Rig Number:
Spud Date: 8/10/2002
End: 9/3/2002
pe~cf'iþti(jr'qf()p~ra~ionš
Rig down. Move rig from PSI-01 to PSI-10. Spot rig
components.
Check all service lines and turn on water, steam, and air. Set
fuel tank, water tanks, and hi line unit. NU 20" diverter while
taking on spud mud.
Rig accepted at 03:00 on 8/10/2002.
NU riser and flow line. Load pipe shed with 5" DP.
Lubricate rig.
Function test diverter. Witness of test waived by John
Spaulding of AOGCC.
PU 120 joints of 5" DP and rack in derrick.
PU drill collars, flex collars, and jars and stand in derrick. PU
MWD, bit, and motor.
RU slickline unit for gyro surveys.
Fill stack with spud mud, start circulating and check system for
leaks.
Spud well and drill 16" hole to 500'. Start directional work at
270'. Run slickline gyro every 100' due to magnetic
interference.
Drill from 500' to 916' continue building angle. Run wireline
gyro every 100'.
Pull off bottom 2 stands. Trouble shoot noise in top drive.
POH to repair top drive.
Disassemble top drive. Found crack in race on torque boost
bearing. Reassemble top drive and dial in traction motor.
Install torque boost.
Repair top drive. RIH with BHA and one stand of DCs and test
top drive with weight. POH, rack back BHA. RIH with 3 stands
of DCs and test top drive with CanRig personnel. Complete
assembiling top drive.
RIH to 460'. Circulate bottoms up. RIH to 800'. Run slickline
gyro check shot. RIH to 916', no fill on bottom. Check tóp
drive.
Drill 16" directional hole from 916' to 1 ,105'. Slide to build
angle. AST=1.9, ART=O.
Drill 16" directional hole from 1,105' to 3357'. Slide and rotate
to build angle and maintain direction.
AST=13.16, ART=2.8.
Circulate and condition mud prior to wiper trip.
Circulate and condition mud prior to wiper trip.
POH to 385'. Tight hole from 2078' to 2054'. Worked through
tight spot to clean up same.
Service rig and check top drive.
RIH from 385', held up at 1953'.
Work pipe from 1953' to 2091'. Orient tool to high side and
work pipe down with and with out pumping.
RIH to 3357'
Drill 16" directional hole from 3357' to 5418'. Slide and rotate
to maintain direction and angle.
AST=1.47, ART=9.58.
Drill directional hole from 5418' to 6077' TD of 16" section.
Circulate and condition mud. Circulate around 50 bbllow vis
Printed: 9/4/2002 10:55:43 AM
)
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
PSI-10
PSI-10
DRILL +COMPLETE
NABORS
NABORS 27ES
Start: 8/9/2002
Rig Release: 9/3/2002
Rig Number:
Spud Date: 8/10/2002
End: 9/3/2002
Date From",.To Hours Task CÓde NPT Phase [)~?criptionQf()þ~l"ätiQns
8/15/2002 10:30 - 13:00 2.50 DRILL P SURF sweep. No significent cuttings increase on bottoms up.
13:00 - 15:30 2.50 DRILL P SURF POH to 3262'. No excessive drag.
15:30 -16:30 1.00 DRILL P SURF RIH to 6077'. No fill on bottom.
16:30 - 18:30 2.00 DRILL P SURF Circulate hole clean. Spot 120 bbl Barfiber pill on bottom.
18:30 - 22:00 3.50 DRILL P SURF POH for casing. Tight spot at 1955' work pipe through to clean
up same.
22:00 - 23:00 1.00 DRILL P SURF Stand back HWDP, flex collars and drill collars.
23:00 - 00:00 1.00 DRILL P SURF Down load MWD. Lay down MWD, mud motor and bit.
8/16/2002 00:00 - 00:30 0.50 DRILL P SURF Lay down MWD, mud motor and bit.
00:30 - 03:30 3.00 CASE P SURF Rig up to run 133/8" casing. Make up fill up tool.
03:30 - 04:00 0.50 CASE P SURF PJSM with casing crew and rig crew.
04:00 - 04:30 0.50 CASE P SURF Make a dummy run with landing joint and casing hanger.
04:30 - 16:30 12.00 CASE P SURF Make up 13 3/8" float shoe and float collar and check same.
Run 147 jts 13 3/8" 68# L-80 BTC casing with shoe at 6067,
Float Collar at 5981' and Tam Port Collar at 1017'. Work pipe
through tight spots, circulate and wash down from 2130' to
2378',2674' to 2748' and 3852' to 4224'. Wash down last joint
as precaution. Make up landing joint with casing hanger and
land casing.
16:30 - 19:00 2.50 CEMT P SURF Circulate and condition mud. Lower vis to 38 and YP to 7.
19:00 - 20:00 1.00 CEMT P SURF Lay down fill-up tool. Make up Dowell cementing head and
lines.
20:00 - 22:00 2.00 CEMT N WAIT SURF Circulate while waiting on 3 vac trucks. Trucks occupied on rig
9ES surface cement job. Hold PJSM with cementers and
drilling crews.
22:00 - 00:00 2.00 CEMT P SURF Dowell pump 5 bbl water and test lines to 3500 psi. Pump 75
bbl Mudpush XL Spacer at 10.2 ppg. Drop bottom plug. Mix
and pump 1066 bbl (1348 sks) ASIII Lead slurry at 10.7 ppg at
8 bpm.
8/17/2002 00:00 - 02:30 2.50 CEMT P SURF Dowell complete pumping Lead Slurry of 1066 bbl (1348 sks)
ASIII Lead slurry at 10.7 ppg at 8 bpm. Mix and pump Tail
Slurry of 125 bbl (600 sks) Class 'G' cement at 15.8 ppg. Drop
top plug and displace with 902 bbl mud using the rig pumps at
12 bpm. Full returns, 250 bbl cement to surface. Plugs did not
bump. Pumped 1/2 shoe track volume. Bleed off pressure.
Floats held.
02:30 - 04:30 2.00 CEMT P SURF Rig down casing running tools, cement head and lines. Clear
rig floor.
04:30 - 05:30 1.00 CEMT P SURF Inspect and service top drive. Clean 20" diverter, riser and flow
line.
05:30 - 06:00 0.50 DIVRTR P SURF PJSM on nipple down BOP.
06:00 - 09:00 3.00 DIVRTR P SURF Nipple down riser, 20" diverter and 16" diverter line.
09:00 - 10:30 1.50 WHSUR P SURF Install FMC 13 5/8" 5M Split Unihead and test to 5000 psi.
10:30 - 17:30 7.00 BOPSURP SURF Nipple up 135/8" 5M BOP, bell nipple and lines. Remove 20"
diverter from cellar.
17:30 - 18:30 1.00 BOPSURP SURF Install TIW valve and saver sub on top drive.
18:30 - 23:30 5.00 BOPSUR P SURF Test BOP and associated equipment to 250 psi low and 4000
psi high for 5 minutes.
Test witnessed by Chuck Scheve of AOGCC.
23:30 - 00:00 0.50 BOPSURP SURF Rig down BOP testing equipment. Install wear bushing.
8/18/2002 00:00 - 00:30 0.50 BOPSUR P SURF Rig down BOP testing equipment. Install wear bushing. Blow
down kill line.
00:30 - 02:00 1.50 DRILL P INT1 Lay down 8" steel drill collars from derrick.
Printed: 9/4/2002 10:55:43 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
PSI-10
PSI-10
DRILL +COMPLETE
NABORS
NABORS 27ES
Start: 8/9/2002
Rig Release: 9/3/2002
Rig Number:
Spud Date: 8/10/2002
End: 9/3/2002
Date FrÓm."'.."'o HOÛfS Task Code NPT Phase [)èsþri þtiþh.ÓtQÞØtatiops
8/18/2002 02:00 - 07:30 5.50 DRILL P INT1 Pick up rebuilt 12 1/4" PDC bit and BHA. Test adjustable
stabilizer.
07:30 - 08:00 0.50 DRILL P INT1 PJSM on picking up 5" drill pipe from pipe shed.
08:00 - 10:30 2.50 DRILL P INT1 Pick up 150 joints 5" drill pipe from pipe shed.
10:30 - 12:00 1.50 DRILL P INT1 RIH with drilling BHA on 5" drill pipe from derick. Tag up on
cement plugs at 5958'.
12:00 - 13:30 1.50 DRILL P INT1 Rig up to test casing. Pressure test casing to 3500 psi for 30
minutes.
13:30 - 15:00 1.50 DRILL P INT1 Drill cement plugs, cement, float collar at 5981', firm cement,
float shoe at 6067' and 20' of formation to 6097'. Start
swapping mud while drilling cement.
15:00 - 16:00 1.00 DRILL P INT1 Circulate and swap mud to LSND 9.0 ppg, condition new mud.
16:00 - 16:30 0.50 DRILL P INT1 Perform FIT. EMW 12.0 ppg
16:30 - 17:00 0.50 DRILL P INT1 Check MWD. Establish ECD base line.
17:00 - 00:00 7.00 DRILL P INT1 Drill 12 1/4" directional hole from 6097' to 6614'. Rotate and
slide to maintain angle and direction.
ART= 4.3
ART=0.8
8/19/2002 00:00 - 12:30 12.50 DRILL P INT1 Drill 12 1/4" directional hole from 6614' to 7873'. Rotate and
slide to maintain angle and direction.
AST= 4.2
ART= 3.52
12:30 - 13:00 0.50 DRILL N RREP INT1 Repair mud pump #1. Change valve and spring.
13:00 - 17:30 4.50 DRILL P INT1 Drill 12 1/4" directional hole from 7873' to 8248'. Rotate and
slide to maintain angle and direction.
AST= 1
ART=2.5
17:30 - 18:30 1.00 DRILL P INT1 Circulate 28 bbl high vis sweep out of hole. Annulus laoding up
with cuttings, ECD 9.8 ppg.
18:30 - 00:00 5.50 DRILL P INT1 Drill 12 1/4" directional hole from 8248' to 8685'. Rotate and
slide to maintain angle and direction.
AST= 1
ART=1.2
8/20/2002 00:00 - 12:00 12.00 DRILL P INT1 Drill Ahead From 8,685' To 9,755' - Weight On Bit 5K To 20K
With Pump Rate At 203 Strokes Or 850 GPM - Off Bottom
Pump Pressure At 3200 Psi. & On Bottom Pump Pressure At
3650 Psi. - Top Drive RPM At 60 To 100 - Off Bottom Torque
At 19K & On Bottom Torque At 24K - String Rotating Weight At
185K - With Pump Off Drag Up At 285K And Drag Down At
145K
Actual Slide Time = 0 Hours
Actual Rotating Time =7.43 Hours
12:00 - 14:00 2.00 DRILL P INT1 Circulate Hi-Vis Sweep For Short Trip
14:00 - 18:00 4.00 DRILL P INT1 Hold Pre-Job Safety Meeting - Monitor Well Bore (Static) -
POH With 5" Drill Pipe To 9,194' - Start To Swab Connect Top
Drive And Pump Out Of The Hole - Starting To Pack Off At
7,506'
18:00 - 18:30 0.50 DRILL P INT1 Rotate Drill String At 7,506' And Establish Good Circulation
Stage Pumps Up To 850 GPM
18:30 - 21 :30 3.00 DRILL P INT1 Continue To POH While Pumping And Back Reaming-
Attempt To Pull Pipe With Out Pumping At Different Spots Still
Wanting To Swab (Pump Out Of Hole) - Tight At 7,127' - 6,307'
Printed: 9/4/2002 10:55:43 AM
,)
Legal Well Name: PSI-10
Common Well Name: PSI-10 Spud Date: 8/10/2002
Event Name: DRILL +COMPLETE Start: 8/9/2002 End: 9/3/2002
Contractor Name: NABORS Rig Release: 9/3/2002
Rig Name: NABORS 27ES Rig Number:
Date Phåsé
8/20/2002 18:30 - 21 :30 3.00 DRILL P INT1 - 6,117' Pull Into 13 3/8" Casing Shoe Torque At 1 OK Surging
To 18K
21 :30 - 22:00 0.50 DRILL P INT1 Monitor Well Bore (Static) - Circulate Across Top Of Hole With
Trip Tank System - Hold Pre-Job Safety Meeting Regarding
Drill Line Cutting Operation
22:00 - 23:30 1.50 DRILL P INT1 Slip And Cut 110' Of 1 3/8" Drill Line - Adjust Draw Works
Mechanical Brakes
23:30 - 00:00 0.50 DRILL P INT1 Service Can-Rig Top Drive, Traveling Blocks And Crown
Sheaves
8/21/2002 00:00 - 00:30 0.50 DRILL P INT1 Continue To Service Can-Rig Top Drive, Traveling Blocks And
Crown Sheaves
00:30 - 02:00 1.50 DRILL P INT1 Hold Pre-Job Safety Meeting - RIH From (6,005') 13 3/8"
Casing Shoe With 5" Drill Pipe From Mast To 7,880' And Fill
Drill String - Continue To RIH To 9,661' (No Problems)-
Connect Top Drive Break Circulation And Wash Last Stand To
Bottom At 9,755' (No Fill)
02:00 - 10:00 8.00 DRILL P INT1 Directional Drill Ahead (Begin Droping Angle) From 9,755' To
9,973' - While Conditioning Mud To Lower Gel Strengths And
Adding Lubricants For Sliding And Torque - Change Shaker
Screens To Finer Mesh And Pump Sweeps Every 300 Feet-
Weight On Bit 5K To 20K With Pump Rate At 203 Strokes Or
850 GPM - Off Bottom Pump Pressure At 3200 Psi. & On
Bottom Pump Pressure At 3650 Psi. - Top Drive RPM At 60 To
100 - Off Bottom Torque At 19K & On Bottom Torque At 24K-
String Rotating Weight At 180K - With Pump Off Drag Up At
320K And Drag Down At 150K
Actual Slide Time = 1.6 Hours
Actual Rotating Time = 2.0 Hours
10:00 - 10:30 0.50 DRILL N DFAL INT1 Sperry Sun MWD Tool Failure - Check And Attempt To Get
Working (NO GOOD)
10:30 - 12:00 1.50 DRILL N DFAL INT1 Circulate Bottoms Up And Condition Mud For Trip
12:00 - 15:00 3.00 DRILL N DFAL INT1 Hold Pre-Job Safety Meeting - Monitor Well Bore (Static) -
POH With 5" Drill Pipe From 9,973' To 9,663' - Start To Swab
Connect Top Drive And Pump Out Of The Hole To (Tight Spot)
At 9,275' - Back Ream From 9,289' To 9,194' And Clean Up
This Section - Continue To Pump Out Of The Hole From 9,194'
To 8,820' - POH With Out Pumping To 8,443' Hole Conditions
Good And Taking Correct Fill On Steel Displacement
15:00 -15:30 0.50 DRILL N DFAL INT1 Monitor Well Bore (Static) - Pump Dry Job - Blow Down Top
Drive
15:30 - 18:30 3.00 DRILL N DFAL INT1 Continue To POH With 5" Drill Pipe Stand Back In Mast From
8,443' To 547' (BHA)
18:30 - 19:30 1.00 DRILL N DFAL INT1 Monitor Well Bore (Static) - Hold Pre-Job Safety Meeting -
Rack Back In Mast 5" HWDP, Drilling Jars, And Flex Collars-
Inspect Adjustable Gauge Stabilizer - Drain Mud Motor - Break
Off 121/4" PDC Hycalog Bit And Inspect Same
19:30 - 20:30 1.00 DRILL N DFAL INT1 Clear Rig Floor - Bring New 12 1/4" Bit To Rig Floor - Down
Load Sperry Sun MWD / LWD Tools
20:30 - 22:00 1.50 DRILL N DFAL INT1 Lay Down And Handle BHA - Break Out And Remove Float
Sub - Break Out Adjustable Gauge Stabilizer - Lay Down
Sperry Sun MWD / LWD Tools And Pulser - Lay Down Sperry
Printed: 9/4/2002 10:55:43 AM
Legal Well Name: PSI-1 0
Common Well Name: PSI-10 Spud Date: 8/10/2002
Event Name: DRILL +COMPLETE Start: 8/9/2002 End: 9/3/2002
Contractor Name: NABORS Rig Release: 9/3/2002
Rig Name: NABORS 27ES Rig Number:
Date Frorn.-"..ro HoUrs Täsk Códe< ...NPT
8/21/2002 20:30 - 22:00 1.50 DRILL N DFAL INT1 Drill 8" Mud Motor
22:00 - 00:00 2.00 DRILL N DFAL INT1 Pick Up New Sperry Mud Motor And Adjust AKO To 1.15 Deg.
- Make Up Adjustable Gauge Stabilizer With Cross Overs -
Pick Up New Sperry MWD / LWD Tools, Pulser With Float
Sub - Orient MWD To Mud Motor - Make Up New 12 1/4"
Hycalog PDC Bit - Initialize Sperry Sun MWD Tools - Change
Out Choke Nozzle On MWD Tool
8/22/2002 00:00 - 04:00 4.00 DRILL N DFAL INT1 Hold Pre-Job Safety Meeting - RIH With 8" Flex Drill Collars,
Drilling Jars And 5" HWDP From Mast - Continue To RIH With
5" Drill Pipe From Mast Fill Drill Stem As Required To 13 3/8"
Casing Shoe - Test Mud Motor And MWD Tools - Continue To
RIH Thru Open Hole Section With (NO Problems) To 9,941' -
Connect Top Drive Break Circulation And Wash Last Single To
Bottom At 9,973' (No Fill)
04:00 - 20:00 16.00 DRILL P INT1 Directional Drill Ahead (Droping Angle) From 9,973' To 10,801'
- Weight On Bit 10K To 15K With Pump Rate At 203 Strokes
Or 850 GPM - Off Bottom Pump Pressure At 3200 Psi. & On
Bottom Pump Pressure At 3425 Psi. - Top Drive RPM At 100-
Off Bottom Torque At 21 K & On Bottom Torque At 24K - String
Rotating Weight At 215K - With Pump Off Drag Up At 270K
And Drag Down At 173K
Actual Slide Time = 5.7 Hours
Actual Rotating Time = 3.9 Hours
20:00 - 22:00 2.00 DRILL P INT1 Increase In Flow Line Percentage Rate - Pick Up And Observe
Well- Gas Breaking Out In Riser But Not Flowing - Start
Increase Of Mud Weight With Spike Fluid To 10.3 PPG - Pump
A Total Of 10,118 Strokes At 511 GPM - 92 Maximum Gas
Units On EPOCH Unit
22:00 - 00:00 2.00 DRILL N DPRB INT1 Open Choke Line HCR Valve To Poor Boy Degasser - Close
Annular Element And Hydraulic Operated Choke - Shut In Well
Due To Gas Breaking Out At Bell Nipple - Record Drill Pipe
And Casing Pressures - Casing Pressure At 70 Psi. And Drill
Pipe Pressure At 120 Psi. - Crack Hydraulic Choke And Bring
Mud Pump On Line - Reciprocate Drill String Thru Annular
Element And Continue To Circulate 10.3 PPG Mud Around
Thru Poor Boy Degasser - Pump 5,282 More Strokes To Get
10.3 PPG Mud Around - Hold Drill Pipe Pressure Constant At
268 Psi. - Casing Pressure At 60 Psi. - Gas Cut Mud Coming
Out At 8.5 PPG.
*NOTE* Notify AOGCC Representive John Crisp
Attempt To Notify Anchorage Personal But Unable Due To
Phone Outage To Anchorage
8/23/2002 00:00 - 00:30 0.50 DRILL N DPRB INT1 Continue To Circulate Thru Poor Boy Degasser At 4 BPM-
Shut Pumps Down Check For Flow Thru Degasser U-Tube (No
Flow) - 0 Psi. On Drill Pipe Pressure Gauge (Float In String)
And 30 Psi. On Casing Pressure Gauge - Drain BOP Stack
And Open Up Annular Element
00:30 - 01 :00 0.50 DRILL N DPRB INT1 Fill Up BOP Stack With Mud And Monitor Well - Gas Cut Mud
Breaking Out At Surface
01 :00 - 03:00 2.00 DRILL N DPRB INT1 Reciprocate Drill String And Increase Mud Weight To 10.6
Printed: 9/4/2002 10:55:43 AM
Legal Well Name: PSI-1 0
Common Well Name: PSI-10 Spud Date: 8/10/2002
Event Name: DRILL +COMPLETE Start: 8/9/2002 End: 9/3/2002
Contractor Name: NABORS Rig Release: 9/3/2002
Rig Name: NABORS 27ES Rig Number:
Date Frorn.,.Tb HOUfS Task COdë ....NPT
8/23/2002 01 :00 - 03:00 2.00 DRILL N DPRB INT1 PPG - Pumping Rate At 9 BPM With 896 Psi. And 65% Flow -
At 5,200 Strokes Gas Subsided In Riser - Back Ground Gas At
38 Units And Coming Back 10.6 On Pressurized Scale And
10.1 PPG On Non Pressurized Scale
03:00 - 13:30 10.50 DRILL P INT1 Monitor Well Bore (Static) - Hold Pre-Job Safety Meeting -
Obtain New Slow Pump Rates With New Mud - Orient Motor
And Directional Drill Ahead From 10,801' To 11,442' - Monitor
Well On Connections - Weight On Bit 15K With Pump Rate At
191 Strokes Or 800GPM - Off Bottom Pump Pressure At 3700
Psi. & On Bottom Pump Pressure At 4000 Psi. - Top Drive
RPM At 100 - Off Bottom Torque At 14K & On Bottom Torque
At 20K - String Rotating Weight At 225K - With Pump Off Drag
Up At 290K And Drag Down At 190K
Actual Slide Time = 3.07 Hours
Actual Rotating Time = 4.39 Hours
13:30 - 15:30 2.00 DRILL P INT1 Circulate 12.6 PPG Hi-Vis Sweep Around Surface To Surface
At 800 GPM
15:30 - 16:30 1.00 DRILL P INT1 Monitor Well Bore (Static) - Hold Pre-Job Safety Meeting -
POH Slow To 10,506' No Problems - Correct Fluid
Displacement For Amount Of Steel Pulled - Pump Dry Job -
Blow Down Top Drive
16:30 -19:00 2.50 DRILL P INT1 Continue To POH With 5" Drill Pipe To 6,005' - 13 3/8" Casing
Shoe With No Problems
19:00 - 19:30 0.50 DRILL P INT1 Circulate Across Top Of Hole With Trip Tank System And
Monitor Returns And Fluids While Service Can-Rig Top Drive,
Traveling Blocks And Crown Sheaves
19:30 - 21 :30 2.00 DRILL P INT1 Hold Pre-Job Safety Meeting - RIH From 6,005' - Fill Drill String
At 8,819' - Continue To RIH To 11,356' - Connect Top Drive
And Break Circulation - Wash And Ream Last Stand To
Bottom At 11,442' (No Fill)
21 :30 - 22:30 1.00 DRILL P INT1 Circulate 12.6 PPG Hi-Vis Sweep Followed With 10.6 PPG
Mud Around Surface To Surface At 800 GPM
22:30 - 00:00 1.50 DRILL P INT1 Gas Breaking Out In Riser At 10,800 Strokes 3,142 Strokes
Before Bottoms Up - Mud Weight Coming Back Gas Cut To
10.2 PPG - Flow Show At 835 GPM Spiked From 84% To 95%
- 125 Maximum Units Of Gas Recorded On EPOCH Gas
Monitor - Continue To Circulate And Raise Mud Weight To 10.8
PPG
8/24/2002 00:00 - 01 :00 1.00 DRILL P INT1 Continue To Raise Mud Weight To 10.8 PPG - Monitor Well
Bore (Static) - Spot 5% Lube Pill On Bottom
01 :00 - 07:30 6.50 DRILL P INT1 Hold Pre-Job Safety Meeting - POH (SLM) With 10 Stands 5"
Drill Pipe With No Problems Hole Taking Correct Amount Of
Fluid For Steel Displacement - Monitor Well (Static) - Pump
Dry Job And Blow Down Top Drive - Continue To POH To 13
3/8" Casing Shoe With No Problems - Shut Down And Observe
Well (Static) - POH With 5" Drill Pipe Standing Back In Mast
07:30 - 08:30 1.00 DRILL P INT1 Stand Back 5" HWDP - Hold Pre-Job Safety Meeting - Lay
Down 8" Drilling Jars And Flex Drill Collars
08:30 - 09:00 0.50 DRILL P INT1 Down Load Sperry Sun MWD / LWD Tools
09:00 - 10:00 1.00 DRILL P INT1 Pump Fresh Water Thru MWD Tools And Mud Motor - Drain
Motor And Remove 12 1/4" PDC Bit - Lay Down MWD Tools
Printed: 9/4/2002 10:55:43 AM
)
)
Legal Well Name: PSI-1 0
Common Well Name: PSI-10 Spud Date: 8/10/2002
Event Name: DRILL +COMPLETE Start: 8/9/2002 End: 9/3/2002
Contractor Name: NABORS Rig Release: 9/3/2002
Rig Name: NABORS 27ES Rig Number:
Date FrÓm ..~..To HoÜrs Task COde NPT [)ëScri þtiOnÓfQpera~ipns
8/24/2002 09:00 - 10:00 1.00 DRILL P INT1 And Mud Motor
10:00 - 10:30 0.50 DRILL P INT1 Clear Rig Floor Of 121/4" Drilling Tools And Equipment
10:30 - 11:00 0.50 CASE P INT1 Hold Pre-Job Safety Meeting - Rig Up And Pull Wear Ring -
Install Lower FMC Test Plug - Rig Up BOP Testing Equipment
11 :00 - 12:00 1.00 CASE P INT1 Hold Pre-Job Safety Meeting - Open Doors On Top BOP Gate
And Remove Ram Blocks And Change To 9 5/8" - Close Doors
12:00 - 13:00 1.00 CASE P INT1 Hold Pre-Job Safety Meeting - Test Top Gate Door Seals And
135/8 5M Annular To 3,500 Psi. Per AOGCC Regulations After
Well Shut In Per AOGCC Representive John Crisp - Rig Down
Testing Equipment - Pull Test Plug And Lay Down Test Joint-
Test Cement Line Off Critical Path At 3,500 Psi.
*NOTE* Weekly BOP TEST Waived Until 9 5/8" Casing In
Place And Cemented Per AOGCC Representive John Crisp
13:00 - 15:30 2.50 CASE P INT1 Hold Pre-Job Safety Meeting - Remove Short Set Of Elevator
Links - Pick Up And Make Up GBR Franks Fill Up Tool - Install
Long Set Of Elevator Links And 350 Ton Elevators - Make
Dummy Run With FMC Flutted Hanger With Landing Joint
15:30 - 16:00 0.50 CASE P INT1 Hold Pre-Job Safety Meeting With BP Drilling Forman, Nabors
Toolpusher And All Personal Regarding Up Coming Casing
Running Operation
16:00 - 00:00 8.00 CASE P INT1 Pick Up 9 5/8" Shoe Track And Float Equipment - Fill With Mud
To Check Floats - Continue To RIH With 103 Joints Of 9 5/8"
471b. L-80 Casing Per Program
8/25/2002 00:00 - 02:30 2.50 CASE P INT1 Hold Pre-Job Safety Meeting - RIH With 146 Joints Of 95/8"
471b. L-80 Casing Per Program To13 3/8" Casing Shoe
(6,067')
02:30 - 03:30 1.00 CASE P INT1 Insert Franks Fill Up Tool - Break Circulation - Stage Up Pump
Rate To 8 BPM - Circulate One Casing Volume With No
Losses 635 Psi. At 80 SPM 19 Maximum Units Of Gas On
EPOCH Gas Monitor - Up Weight At 270K And Down Weight
At 180K
03:30 - 10:00 6.50 CASE P INT1 Continue To RIH With 275 Joints Of 95/8" 471b. L-80 Casing
Per Program With (NO LOSSES) - Make Up Space Out Pup &
Pick Up Joint 276 - Install FMC Flutted Hanger And Landing
Joint - Stab In Franks Fill Up Tool And Break Circulation -
Circulate Landing Joint To Bottom At 11,431' And Land Hanger
(NO Problems)
10:00 - 12:00 2.00 CASE P INT1 Continue To Circulate And Condition Mud Stage Up Pump
Rate To 9.5 BPM At 900 Psi. With Two Mud Pumps - Reduce
Volume In Mud System - Hold Pre-Job Safety Meeting
Regarding Up Coming Cement Job With All Personal
12:00 - 13:00 1.00 CASE P INT1 Hold Pre-Job Safety Meeting - Shut Down Mud Pumps - Rig
Down Franks Casing Fill Up Tool - Install Cement Head
Adaptor And Cement Head - Make Up Circulation Hose - Break
Circulation 6 BPM At 700 Psi. - Batch Mix 50 BBLS. 12.5 PPG
Mud Push And 132 BBLS. 15.8 PPG Class "G" Gasblock
Cement
13:00 - 15:30 2.50 CEMT P INT1 Shut Down And Turn Over To Dowell- Pump 5 BBL. CW-100-
Test Lines At 3,500 Psi. - Pump 75 BBLS. CW-100 - Pump 50
BBLS. 12.5 PPG. Mud Push XL Spacer - Drop Bottom Plug -
Pump 134 BBLS. Batch Mixed 15.8 PPG Class "G"
Printed: 9/4/2002 10:55:43 AM
)
BP
QpE!ra~i()ø~Sl.JrolT8~ry>Repørt
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
PSI-10
PSI-10
DRILL +COMPLETE
NABORS
NABORS 27ES
Start: 8/9/2002
Rig Release: 9/3/2002
Rig Number:
Spud Date: 8/10/2002
End: 9/3/2002
Date Frdrrì~Tó HoUrs Task Code NPT Phase p$scripti()hqf OpØr<3tiqps
8/25/2002 13:00 - 15:30 2.50 CEMT P INT1 GASBLOCK Tail Cement Slurry At 6 BPM - Drop Top Plug-
Flush Dowell Cement Lines With 10 BBLS. Water - Shut Down
And Swap To Rig Pumps For Displacement - Displace With
840 BBLS. Of 10.8 PPG Mud At 12 BPM - Slow Pumps To 2
BPM And Bump Plug With 500 Psi. Above Final Circulation
Pressure - Bleed Pressure To 0 Psi. And Check Floats (Floats
OK) - Cement In Place At 15:24 Hours
15:30 - 18:00 2.50 CEMT P INT1 Hold Pre-Job Safety Meeting - Rig Down Dowell Cement Head
- Back Out 9 5/8" Landing Joint And Lay Down Same - Rig
Down Casing Tools And Clear Rig Floor
18:00 - 20:30 2.50 DRILL P PROD1 Hold Pre-Job Safety Meeting - Change Bales To Short Set -
Pick Up 5" Drill Pipe Elevators - Latch Up Stand Of 5" HWDP
And Install 9 5/8" Pack Off - Test At 5,000 Psi. For 10 Minutes
(Test Good)
20:30 - 22:00 1.50 DRILL P PROD1 Hold Pre-Job Safety Meeting - Open Doors On Top BOP Gate
And Remove Ram Blocks And Change To 41/2" X 7"
Variables - Close Doors
22:00 - 22:30 0.50 DRILL P PROD1 Hold Pre-Job Safety Meeting - Install Upper Test Plug And Rig
Up Testing Equipment - Flush Mud Lines With Water -
Circulate To Poor Boy Degasser Thru Choke
22:30 - 00:00 1.50 DRILL P PROD1 Hold Pre-Job Safety Meeting - Witness Of BOP Test Waived
By AOGCC Inspector John Crisp - Test Annular At 250 Psi.
Low And 2,500 Psi. High - Test Upper And Lower Pipe Rams,
Blind Rams, Choke Manifold, Floor Safety Valve, Dart Valve,
Top Drive Upper And Lower IBOP Valves, Manual And HCR
Valves On The Choke And Kill Lines At 250 Psi. Low And
4,000 Psi. High - Test Pit PVT System And H2S And LEL
Detectors - Perform Accumulator Test
8/26/2002 00:00 - 02:30 2.50 DRILL P PROD1 Hold Pre-Job Safety Meeting - Continue To Test BOP And
Related Equipment
*NOTE*
Hold Pre-Job Safety Meeting - While Testing BOP Rig Up And
Pumped Down 13-3/8" x 9-5/8" Annulus Established Injectivity
Rate At 2 BPM With 1,179 Psi. - Rig Up Little Red - Test Lines
To 2,500 Psi. Bull Head 133 BBLS. Of Dead Crude Oil Down
Annulus To Freeze Protect
02:30 - 03:30 1.00 DRILL P PROD1 Hold Pre-Job Safety Meeting - Rig Down Testing Equipment-
Remove Test Plug - Install Short Bowl Protector And Energize
Lock Down Studs
03:30 - 07:30 4.00 DRILL P PROD1 Hold Pre-Job Safety Meeting - Bring BHA No.4 - Bit And Tools
To Rig Floor - Pick Up And Make Up 81/2" Bit And BHA-
Orient MWD/LWD Tools And Initialize Same - Connect Top
Drive And Surface Test MWD And Sperry Motor - Hold Pre-Job
On Radioactive Source - Install Source And RIH - Continue To
Pick Up BHA
07:30 - 09:30 2.00 DRILL P PROD1 Hold Pre-Job Safety Meeting - RIH With BHA No.4 And 5" Drill
Pipe From Mast To 5,400'
09:30 - 10:00 0.50 DRILL P PROD1 Break Circulation And Fill Drill String - Service Top Drive,
Traveling Blocks, And Crown Sheaves
10:00 -12:30 2.50 DRILL P PROD1 Continue To RIH With 5" Drill Pipe From Mast To 8,332'-
Connect Top Drive And Fill Drill String - RIH To 11,264'
12:30 - 14:00 1.50 DRILL P PROD1 Break Circulation - Hold Pre-Job Safety Meeting - Prepare And
Printed: 9/4/2002 10:55:43 AM
Legal Well Name: PSI-1 0
Common Well Name: PSI-10 Spud Date: 8/10/2002
Event Name: DRILL +COMPLETE Start: 8/9/2002 End: 9/3/2002
Contractor Name: NABORS Rig Release: 9/3/2002
Rig Name: NABORS 27ES Rig Number:
Date FrÖht..~...TÖ Hours. Task Codê NPT Phase
8/26/2002 12:30 - 14:00 1.50 DRILL P PROD1 Test 9 5/8" Casing To 3,500 Psi. Hold For 30 Minutes (Test
Good) - Bleed Preasure To 0 Psi.
14:00 -15:00 1.00 DRILL P PROD1 Tag Casing Wiper Rubbers At 11,345' - Drill Wiper Rubbers
And Tag Float Collar At 11,348' - Drill Cement To 11,390'
15:00 - 16:00 1.00 DRILL P PROD1 Hold Pre-Job Safety Meeting - Swap Out Mud System To 9.0
PPG BaradrilN Mud - Clean Possom Belly And Under Shakers
- Continue To Drill Cement And Tag Top Of Float Shoe At
11 ,430' (Bottom At 11 ,432') - Wash And Ream 12 1/4" Rat
Hole From 11,432' To 11,442' - Drill 8 1/2" New Hole To
11 ,462'
16:00 - 17:00 1.00 DRILL P PROD1 Circulate Bottoms Up - Verify 9.0 PPG Mud In And Out
17:00 - 17:30 0.50 DRILL P PROD1 Hold Pre-Job Safety Meeting - Pull Bit In 9 5/8" Casing Shoe
Closed Pipe Rams And Performed FIT.
Strokes Pmp'd Pressure
2 100 psi
4 175 psi
6 225 psi
8 300 psi
10 390 psi
11 450 psi
Held Test F/1 0 minutes wi 25 Psi. Pressure Loss.
MW 9.0 ppg, Csg Shoe TVD 8,233' Pressure 450 psi = 10.05
PPG. EMW.
Bleed Pressure To 0 Psi. - Open Pipe Rams
17:30 - 21 :30 4.00 DRILL P PROD1 Obtain Slow Pump Rates With New 9.0 PPG Mud - Drill Ahead
From 11,462' To 11,641' - Weight On Bit 20K To 25K - With
Pump Rate At 137 Strokes Or 573 GPM - Off Bottom Pump
Pressure At 2200 Psi. & On Bottom Pump Pressure At 2400
Psi. - Top Drive RPM At 100 - Off Bottom Torque At 29K & On
Bottom Torque At 26K - String Rotating Weight At 220K - With
Pump Off Drag Up At 335K And Drag Down At 165K
Actual Rotating Time 3.5 Hours
Actual Slide Time At 0.0 Hours
21 :30 - 00:00 2.50 DRILL P PROD1 High Torque - Pump 5% Lube Tex Pill Around (No Help) -
Pump Out Of Hole To 9 5/8" Casing Shoe - Mix And Pump EP
Mud Lube Pill From Surface To Surface
8/27/2002 00:00 - 01 :00 1.00 DRILL P PROD1 Continue To Pump Weighted "EP" Mud Lube Pill Around While
Rotating And Reciprocating Drill String - Up Weight 240K,
String Weight 210K, Down Weight 198K - Torque Rotating 25K
01 :00 - 01 :30 0.50 DRILL P PROD1 Wash To Bottom At 11,641' With No Problems
01 :30 - 05:00 3.50 DRILL P PROD1 Drill Ahead From 11,641' To 11,809' - Weight On Bit 20K To
25K - With Pump Rate At 137 Strokes Or 573 GPM - Off
Bottom Pump Pressure At 2200 Psi. & On Bottom Pump
Pressure At 2400 Psi. - Top Drive RPM At 100 - Off Bottom
Torque At 29K & On Bottom Torque At 26K - String Rotating
Weight At 220K - With Pump Off Drag Up At 335K And Drag
Down At 165K
Printed: 9/4/2002 10:55:43 AM
'}
)
Legal Well Name: PSI-1 0
Common Well Name: PSI-10 Spud Date: 8/10/2002
Event Name: DRILL +COMPLETE Start: 8/9/2002 End: 9/3/2002
Contractor Name: NABORS Rig Release: 9/3/2002
Rig Name: NABORS 27ES Rig Number:
Date F rOm~'TO HOUrs Täsk Codé NPT Phase
8/27/2002 01 :30 - 05:00 3.50 DRILL P PROD1 Actual Rotating Time 3.5 Hours
Actual Slide Time At 0.0 Hours
05:00 - 06:30 1.50 DRILL P PROD1 Pump Up Survey - Circulate Sweep - Monitor Well Bore (Static)
- Spot Logging Pill In Open Hole
06:30 - 07:00 0.50 DRILL P PROD1 Hold Pre-Job Safety Meeting - POH Slow To 9 5/8" Casing
Shoe (11 ,431') With "NO" Problems - Up Weight At 420K
07:00 - 07:30 0.50 DRILL P PROD1 Monitor Well Bore (Static) - Pump Dry Job - Drop Rabbit With
Slick Line Tail Attached - Blow Down Top Drive
07:30 - 11 :30 4.00 DRILL P PROD1 POH With 5" Drill Pipe Stand Back In Mast
11 :30 - 13:00 1.50 DRILL P PROD1 Hold Pre-Job Safety Meeting - Lay Down 5" HWDP, Drilling
Jars, And Flex Drill Collars - Pump Fresh Water Thru Sperry
Sun MWD / LWD And Mud Motor
13:00 - 15:00 2.00 DRILL P PROD1 Hold Pre-Job Safety Meeting - Remove Radio Active Sources
From Logging Tools - Down Load Data From MWD / LWD And
Lay Down - Drain Motor And Break Off 8 1/2" Drill Bit - Lay
Down Motor And Clear Rig Floor
15:00 -16:00 1.00 EVAL P PROD1 Hold Pre-Job Safety Meeting - Rig Up Schlumberger Electric
Line Services - Make Up Ultra Sonic Imaging Tools
16:00 - 21 :00 5.00 EVAL P PROD1 RIH With USIT Tools To 11,431 (9 5/8" Casing Shoe) - Log
From 11,431' To Top Of Cement - POH
21 :00 - 21 :30 0.50 EVAL P PROD1 Hold Pre-Job Safety Meeting - Lay Down USIT Tools And Pick
Up Bore Hole Sonic Tools
21 :30 - 00:00 2.50 EVAL P PROD1 RIH With BHS Tools To 11,809' - Log Open Hole Section Up
To 9 5/8" Casing Shoe - POH With Electric Line Cable
8/28/2002 00:00 - 01 :00 1.00 EVAL P PROD1 Hold Pre-Job Safety Meeting - Continue To POH With Logging
Tools - Lay Down Tools And Rig Down Schlumberger
01 :00 - 01 :30 0.50 EVAL P PROD1 Clear Rig Floor And Clean Up Around Draw Works After
Cleaning Project
01 :30 - 03:30 2.00 CASE P COMP Hold Pre-Job Safety Meeting - Rig Up To Run 7" 26 lb. L-80
Liner - Pick Up Shoe Track And Check Floats - Continue To
RIH With 11 Joints Of 7" 26 lb. L-80 BTC Mod Casing Per
Program - Make Up Pup Joint - Change Elevators To 5" Pick
Up Baker Liner Hanger And ZXP Packer With Running Tool -
Verify That Liner Wiper Plug In Baker Liner Hanger
03:30 - 04:00 0.50 CASE P COMP Hold Pre-Job Safety Meeting - Rig Down Casing Equipment
And Clear Rig Floor
04:00 - 04:30 0.50 CASE P COMP RIH With 1 Stand - Circulate 7" Liner Volume
*NOTE* Liner Weight At 14K When Full Of Mud
04:30 - 11 :30 7.00 CASE P COMP Continue To RIH (Slow) With 5" Drill Pipe From Mast To 9 5/8"
Casing Shoe - Fill Every Ten Stands
*NOTE* Verify Top Of Cement In The 13 3/8" X 20" Annulus -
Cement Is At The 4" Outlets On Conductor Casing
11 :30 - 12:30 1.00 CASE P COMP Connect Top Drive And Break Circulation - Circulate And
Condition Mud At 3 BPM Stage Pump Rate Up To 6 BPM - Up
Weight 245K And Down Weight At 170K
12:30 - 13:00 0.50 CASE P COMP RIH To 11,802' With 7" Liner On 5" Drill Pipe From Mast
13:00 - 13:30 0.50 CASE P COMP Pick Up And Make Up Baker Plug Droping Head - Connect
Circulating Lines -Break Circulation And Wash Down Tag
Bottom At 11,809'
13:30 -14:15 0.75 CASE P COMP Circulate And Stage Up Pump Rate To 6 BPM With 600 Psi.-
Reciprocate 7" Liner While Batch Mixing Cement
Printed: 9/4/2002 10:55:43 AM
)
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
8/28/2002
14:15 - 14:45
14:45 - 15:15
15:15 -15:30
15:30 - 17:00
17:00 - 21 :00
21 :00 - 23:00
23:00 - 00:00
8/29/2002
00:00 - 01 :30
01 :30 - 03:00
03:00 - 07:00
07:00 - 08:30
08:30 - 14:00
14:00 -15:00
15:00 - 16:00
16:00 - 21 :00
21 :00 - 22:00
PSI-10
PSI-10
DRILL +COMPLETE
NABORS
NABORS 27ES
Start: 8/9/2002
Rig Release: 9/3/2002
Rig Number:
Spud Date: 8/10/2002
End: 9/3/2002
Hours Task Code- NPT
0.50 CEMT P
COMP
0.50 CEMT P
COMP
0.25 CEMT P
COMP
1.50 CEMT P
COMP
4.00 CEMT P
COMP
2.00 CEMT P
COMP
1.00 CEMT P
COMP
1.50 CLEAN P
COMP
1.50 CLEAN P
COMP
4.00 CLEAN P
COMP
1.50 CLEAN P
5.50 CLEAN P
COMP
COMP
1.00 CLEAN P
COMP
1.00 CLEAN P
COMP
5.00 CLEAN P
COMP
1.00 CLEAN P
COMP
Shut Down And Turn Over To Dowell - Pump 5 BBL CW-1 00 -
Pressure Test Surface Equipment At 3,500 Psi. (Test Good) -
Reciprocate Liner - Pump 25 BBLS CW-100 - 30 BBLS 10.0
PPG Mud Push XL Spacer - 30 BBLS 15.8 PPG Class "G" Gas
Block Cement Slurry - Shut In Plug Droping Head And Flush
Cement Lines
Drop Drill Pipe Wiper Dart And Displace With 9.0 PPG
BaradrillN Mud At 10 BPM With Rig Pumps - Slow Rate And
Observe Latch Up Of Liner Wiper Plug Sheared At 1 ,200 Psi. -
Continue To Displace And Bump Plug With 217 BBLS Away -
Cement In Place At 15:13 Hours
Pressure Up To 3,500 Psi. - Slack Off 20K And Verify That
Liner Hanger Set - Bleed Pressure To 0 Psi. And Check Floats
(OK) - Rotate 20 Turns The Right And Release Liner -
Pressure Up To 1,000 Psi. Pick Up And Unsting Cups -
Observe Pressure Drop And Pump 20 BBLS A 10 BPM -
Reduce Pump Rate To 3 BPM - Set Down 70K And Set ZXP
Packer.
Circulate 1.5 Times Annular Vol;ume ( 1 BBL. Cement Back).
Hold Pre-Job Safety Meeting - Rig Down Cement Head And
Circulating Lines.
Hold Pre-Job Safety Meeting - Pump Dry Job - Blow Down Top
Drive - POH 1,878'
Hold Pre-Job Safety Meeting - Slip And Cut (130 Feet) 1 3/8"
Drill Line - Service Top Drive, Crown Sheaves, And Traveling
Blocks
Continue To POH With Baker Liner Running Tool - Stand 5"
Drill Pipe Back In Mast - Clean And Lay Down Running Tool-
Pump Fresh Water Thru Kill Line And Choke Manifold To Poor
Boy Degasser
Hold Pre-Job Safety Meeting - Blow Down Choke Line To Poor
Boy Degasser - Rig Up To Run 3 1/2" HWDP
Hold Pre-Job Safety Meeting - Make Up 6 1/8" Bit, Cross Overs
And Casing 7" Scraper - Pick Up 3 1/2" HWDP - Make Up
Cross Overs And 9 5/8" Scraper - Break Circulation And Pump
Thru BHA
Hold Pre-Job Safety Meeting - RIH With 7" And 9 5/8" Casing
Scrapers On 5" Drill Pipe From Mast - Travel Thru Top Of 7"
Liner Top At 11,319' With No Problems - Continue To RIH
(Slow) Thru Liner Tag Cement At 11,718'
Circulate Hole Clean
Hold Pre-Job Meeting - Spot Trucks For Displacement - Pump
25 BBL Barazan Spacer, 50 BBLS Hot Diesel, 25 BBLS
Barazan Spacer, 50 BBL Dirt Magnet, 25 BBL Hi-Vis Sweep
Followed By 8.5 PPG KCL Water At 10 BPM - 108 Final NTU -
Lay Down Single Of Drill Pipe And Make Up Head Pin
Rig Up And Pressure Test Casing To 4,000 Psi For 30 Minutes
(Test Good)
Hold Pre-Job Safety Meeting - Pump Dry Job Blow Down Top
Drive - POH Standing 28 Stands Of 5" Drill Pipe In Mast
Hold Pre-Job Safety Meeting - Continue To POH Laying Down
5" Drill Pipe To BHA
Change Slips, Elevators, And Iron Ruffneck Heads To Accept 3
Printed: 9/4/2002 10:55:43 AM
)
")
BP
(;)Þ~r~~iol1~...$lJrnroarY...RØpOrt
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
PSI-10
PSI-10
DRILL +COMPLETE
NABORS
NABORS 27ES
Date
From .;To Hours Task Code NPT Phase
8/29/2002
21 :00 - 22:00
1.00 CLEAN P
COMP
22:00 - 22:30 0.50 RUNCOIVP
22:30 - 00:00 1.50 RUNCOIVP
8/3012002 00:00 - 00:30 0.50 RUNCOIVP
00:30 - 01 :30 1.00 RUNCOIVP
COMP
COMP
COMP
COMP
01 :30 - 02:30
1.00 RUNCOIVP
COMP
02:30 - 18:30
16.00 RUNCOIVP
COMP
18:30 - 19:45
1.25 RUNCOIVP
COMP
19:45 - 22:30
2.75 RUNCOIVP
COMP
Start: 8/9/2002
Rig Release: 9/3/2002
Rig Number:
Spud Date: 8/10/2002
End: 9/3/2002
D~scriptiorr QfOperati(jrt$
1/2" Pipe - Lay Down 9 5/8" Casing Scraper And Cross Overs -
13 Joints Of 3 1/2" HWDP - 7" Casing Scraper - Clear Rig
Floor
Hold Pre-Job Safety Meeting - Rig Up And Pull Short Bowl
Protector
Hold Pre-Job Safety Meeting - Rig Up Casing Tools To Run
Completion
Hold Pre-Job Safety Meeting - Continue To Rig Up Equipment
To Run Completion Assembly
Hold Pre-Job Safety Meeting - RIH With 7" Completion Tail
Pipe And Baker Lock Connection Between 7" TC-11 Pup
Joints- Pick Up Baker SABL-3 Packer And Polished Bore
Receptacle - Make Up HES "R" Nipple Assembly
Hold Pre-Job Safety Meeting - Change Eleavtors And Slips To
Accept 7 5/8" Tubing - Rig Up Scaffolding For Tong Operator
Pick Up And RIH With 277 Joints Of 75/8" 29.70 lb. L-80 STL
Tubing Per Well Program - While Monitoring Returns To Trip
Tank. Record The Following Up And Down Weights.
3,000 Feet - 130K Up And 125K Down
6,000 Feet -190K Up And 165K Down
9,000 Feet - 255K Up And 190K Down
11 ,288 Feet - 320K Up And 225K Down
Hold Pre-Job Safety Meeting - Drop Baker Ball And Rod -
Remove 200 Ton 7 5/8" Elevators And Install 5" Drill Pipe
Elevators - Pick Up (1) Single Of 5" Drill Pipe And (1) 15' Pup
Joint With Cross Overs - Make Up Floor Valve, Head Pin, And
Circulating Hose - Rig Up Circle Chart Recorder - Place Baker
SABL-3 Packer On Setting Depth @ 11,244' - Wire Line Entry
Guide @ 11 ,288'
Hold Pre-Job Safety Meeting - Clear Non Essential Personal
From Rig Floor During Packer Setting Process - Pressure Up
Down Tubing To 500 Psi. And Wait 3 Minutes -Increase
Pressure To 1,000 Psi. And Wait 3 Minutes - Increase
Pressure To 1,500 Psi. And Wait 3 Minutes - Increase
Pressure To 1,750 Psi And Wait 5 Minutes - Pump A Total Of
36 Strokes With Mud Pump - See Reduction On Weight
Indicator During Pressure Up Process - Verify That Annulus
Full And Static - Slack Off On Completion String (Packer Not
Set) With 225K Down Weight - Bleed Pressure To 0 Psi. And
Pull String Back Up Hole With 320K Up Weight To Setting
Depth - Baker Representive Called And Talked To Baker
Engineers Located In Anchorage - Pressure Up To 1,850 Psi.
With 40 Strokes On Mud Pump - Wait 5 Minutes And Slack Off
On Completion String Packer Not Set - Bleed Pressure To 0
Psi. And Pick Back Up To Setting Depth - Pressure Up To
2,000 Psi. - Wait 5 Minutes And Slack Off Completion String
Packer Not Set - Call Anchorage ODE (Walter Quay) And
Drilling Superintendent (Mark Stanley) Regarding Packer
Printed: 9/4/2002 10:55:43 AM
)
Leg al Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
Date
PSI-10
PSI-10
DRILL +COMPLETE
NABORS
NABORS 27ES
8/30/2002
19:45 - 22:30
F"óm~Tó Hours Task
2.75 RUNCOIVP
22:30 - 00:00
8/31/2002
00:00 - 05:30
05:30 - 07:30
07:30 - 00:00
9/1/2002
00:00 - 02:00
02:00 - 07:00
07:00 - 07:30
1.50 PULL N
5.50 PULL N
2.00 PULL N
16.50 PULL N
2.00 PULL N
5.00 PULL N
0.50 RUNCOI\/N
Start: 8/9/2002
Rig Release: 9/3/2002
Rig Number:
Spud Date: 8/10/2002
End: 9/3/2002
COMP
Setting Problem - Slack String Down 8' Putting Elevators At
Floor And Verify That Packer Not Set - Pull Completion String
Back To Setting Depth - Pick Completion String Up 25' (320K)
And Slack Down (225K) To Packer Setting Depth - Pressure
Up To 1,500 Psi. And Hold For 15 Minutes - Slack Off 8'
Packer Not Set- Bleed Pressure To 0 Psi. And Shut Down
Process
Hold Pre-Job Safety Meeting - Rig Down Circulating Hose,
Head Pin, And Floor Valve - Lay Down 5" Drill Pipe 15' Pup
Joint - POH With 5" Drill Pipe Single - Install 350 Ton Slips-
Break Off Cross Over To 7 5/8 Tubing And Lay Down Single
Joint Of Drill Pipe - Clear Rig Floor - Wait On Haliburton Slick
Line Unit
Wait On Slick Line Unit And Tools To Arrive On Location - Hold
Pre-Job Safety Meeting - Rig Up Haliburton Slick Line Unit At
02:30 Hours - Make Up Tools - RIH At 02:45 Hours With BallI
Rod Retrieving Tool- Work To Get On Rod - POH At 04:15
Hours With Slick Line And Ball / Rod Retrieving Tools
(Recovered Ball And Rod) - Lay Down Slick Line Tools At
05:15 Hours And Rig Down Haliburton Unit
Hold Pre-Job Safety Meeting - Install Cross Over To 7 5/8"
Tubing And Make Up Head Pin - Make Up Circulating Hose
And Pump Dry Job - Rig Down Circulating Equipment - Pick Up
200 Ton Eelvators - Rig Up Compensator And Single Joint
Elevators
POH Laying Down 268 Joints Of 75/8" 29.70 lb. L-80 STL
Tubing - While Monitoring Returns To Trip Tank
Hold Pre-Job Safety Meeting - Continue To POH Laying Down
A Total Of 277 Joints 7 5/8" 29.70 lb. L-80 STL Tubing-
Change Eleavtors And Slips To Accept 7" TC-11 Tubing - Rig
Down Scaffolding - Lay Down HES "R" Nipple Assembly And
Baker Polished Bore Receptacle - Pull Baker SABL-3 Packer
To Rig Floor And Inspect Packer Was Found To Be Pinned
With 4 Each. Brass Screws And Looked Brand New Also It
Never Attempted To Set - Heat Baker Locked Pup Joint TC-11
Connections Below Packer And Break Out Inspect Threads All
Okay - Let Connections Cool And Lay Down 7" Completion Tail
Pipe - Ship Baker SABL-3 Packer To Shop
Look Inside Tail Pipe At "R" Nipple For RBX Nipple Reducer
And RHC-M Plug It Was Not Located In "R/I Nipple It Was
Found To Be In Baker K-22 Anchor Tubing Seal Nipple Above
Baker SABL-3 Packer So The Packer Never Saw Any Pressure
- Ship Tail Pipe Assembly To Shop And Disassemble To Place
RBX Nipple Reducer And RHC-M Plug In Correct Position -
Wait On Completion Tail Pipe And Packer To Be Redressed
Hold Pre-Job Safety Meeting - Place Pre Made Up In Shop
Completion Assembly NO.1 In Rotary Table - Install Bash Ross
Safety Clamp Around Assembly - Remove 7" TC-11 Collar And
Clean Threads For Baker Locking - Install Coupling Hand Tight
- Pick Up Assembly No.2 SABL-3 Packer And Baker Lock
Lower 7/1 TC-11 Pup Joint Pin Threads - Insert Pin Into
Coupling And Install Casing Tongs With Intregal Back Up -
Attempt To Make Up Connection (Connection Threads
DFAL COMP
DFAL COMP
DFAL COMP
DFAL COMP
DFAL COMP
DFAL COMP
DFAL COMP
Printed: 9/4/2002 10:55:43 AM
)
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
9/1/2002
07:00 - 07:30
07:30 - 08:30
08:30 - 09:00
09:00 - 10:00
10:00 - 00:00
9/2/2002
00:00 - 01 :00
01 :00 - 02:30
02:30 - 04:00
04:00 - 06:00
06:00 - 09:00
09:00 - 11 :30
BP
OÞE!ratipn~$ Ummf1I"Y;;R~pOrt
PSI-10
PSI-10
DRILL +COMPLETE
NABORS
NABORS 27ES
Hours Task Cbdë<NPT
0.50 RUNCONN
1.00 RUNCONN
0.50 RUNCONN
1.00 RUNCONN
14.00 RUNCONN
1.00 RUNCONN
1.50 RUNCONN
1.50 RUNCONN
2.00 RUNCONN
3.00 RUNCONN
2.50 RUNCOrvP
DFAL COMP
DFAL COMP
DFAL COMP
DFAL COMP
DFAL COMP
DFAL COMP
DFAL COMP
DFAL COMP
DFAL COMP
DFAL COMP
COMP
Start: 8/9/2002
Rig Release: 9/3/2002
Rig Number:
Spud Date: 8/10/2002
End: 9/3/2002
DesGriþtiþh()tOp~ratidQs
Crossed) Attempt To Break Out Connection Nabors Alaska
Drilling Floorman Was Injured In Process. See LCIR No.
2002-IR-301966
Shut Down Operation And Have Safety Stand Down With
Nabors Drilling And Casing Crews Involved In Incident-
Preform Investigation And Identify Causes - Raise Level Of
Awareness And Upmost Need For Constant Communication
Continue To RIH With 7" Completion Tail Pipe And Baker Lock
Connection Between 7" TC-11 Pup Joints- Pick Up Baker
SABL-3 Packer And Polished Bore Receptacle - Make Up HES
"R" Nipple Assembly
Hold Pre-Job Safety Meeting - Change Eleavtors And Slips To
Accept 7 5/8" Tubing - Rig Up Scaffolding For Tong Operator
Pick Up And RIH With 258 Joints Of 75/8" 29.70 lb. L-80 STL
Tubing Per Well Program - While Monitoring Returns To Trip
Tank. Record The Following Up And Down Weights.
3,000 Feet - 130K Up And 125K Down
6,000 Feet - 190K Up And 165K Down
9,000 Feet - 255K Up And 190K Down
Continue To RIH With A Total Of 277 Joints 7 5/8" 29.70 lb.
L-80 STL Tubing Per Well Program To 11,249 Feet - String
Weight At 320K Up And 225K Down
Hold Pre-Job Safety Meeting - Drop Baker Ball And Rod At
01 :44 Hours - Remove 200 Ton 7 5/8" Elevators And Install 5"
Drill Pipe Elevators - Pick Up (1) Single Of 5" Drill Pipe And (1)
15' Pup Joint With Cross Overs - Make Up Floor Valve, Head
Pin, And Circulating Hose - Rig Up Circle Chart Recorder -
Place Baker SABL-3 Packer On Setting Depth @ 11,244' -
Wire Line Entry Guide @ 11,288'
Hold Pre-Job Safety Meeting - Clear Non Essential Personal
From Rig Floor During Packer Setting Process - At 02:26
Hours Attempt To Pressure Up Down Tubing Ball And Rod Not
On Seat - Circulating At 3 BPM With 152 Psi. Ramp Pump Up
To 5 BPM With 508 Psi. Trying To Get Ball On Seat (No Good)
At This Point 68 BBLS. Pumped - Shut Down For 5 Minutes
And Pump Additional 17 BBLS At 03:03 Hours - Shut Down
And Stroke Completion String Up On Way Down Open Bleeder
- Pump Additional 15 BBLS For A Total Of 100 BBLS - Shut
Down At 03:22 Hours - Line Up And Reverse Circulate A Total
Of 10 BBLS At 19 Psi. - Line Up Down Tubing And Pump 15
BBLS At 2.6 BPM With 88 Psi. - Shut Down At 03:45 Hours
Call Haliburton Slick Line Unit - Pump 6 BBLS. At 2 BPM Every
Hour Break Down Circulating Equipment - POH And Install 350
Ton Slips - Break Out And Lay Down Landing Joint - Wait On
Slick Line Unit And Tools
Hold Pre-Job Safety Meeting - Rig Up Haliburton Slick Line
Unit - Make Up Tools And RIH With Impression Block - Tag
Rod 2' High - Push Rod To 11,211' Wire Line Measurement -
POH And Set Tools Aside
Hold Pre-Job Safety Meeting - Pick Up (1) Single Of 5" Drill
Printed: 9/4/2002 10:55:43 AM
)
)
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
PSI-10
PSI-10
DRILL +COMPLETE
NABORS
NABORS 27ES
Start: 8/9/2002
Rig Release: 9/3/2002
Rig Number:
Spud Date: 8/10/2002
End: 9/3/2002
Date Frbrtï;;;.To Hours Task Code NPT Phase DésÖriptiohofOper~~iqns
9/2/2002 09:00 - 11 :30 2.50 RUNCOrvP COMP Pipe And.(1) 15' Pup Joint With Cross Overs - Make Up Floor
Valve, Head Pin, And Circulating Hose - Rig Up Circle Chart
Recorder - Place Baker SABL-3 Packer On Setting Depth @
11,244' - Wire Line Entry Guide @ 11,288' - Pressure Up To
500 Psi - Continue Up To 1,000 Psi And Hold Pressure For 5
Minutes - Increase Pressure To 1,100 Psi. (See Indication Of
Packer Setting) Continue To Pressure Up To 1,750 Psi. - Slack
Off On Completion String 40K And Continue To Pressure Up
To 2,500 Psi. And Hold For 15 minutes - Bleed On Tubing To
Pressure To 0 Psi. - Pressure Test Annulus To 1,000 Psi. Hold
For 15 Minutes (No Returns From Tubing After Pressure Build
Up) - Bleed Pressure Off Annulus - Work To Shear Out Of PBR
- Normal Up Weight @ 320K Continue To Pick Up Tubing
String To 41 OK To Shear PBR (NO GOOD) - Apply 1,000 Psi.
Down Tubing And Shear Off PBR At 400K
11 :30 - 12:00 0.50 RUNCOrvP COMP Hold Pre-Job Safety Meeting - Lay Down Floor Valve, Head
Pin, And Circulating Hose (1) Single Of 5" Drill Pipe And (1) 15'
Pup Joint With Cross Over
12:00 - 14:00 2.00 RUNCOrvP COMP Hold Pre- Job Safety Meeting - Make Up FMC Tubing Hanger -
Install NSCC X 4 1/2" IF Crossover And Pick Up Single Of
Drill Pipe - Make Up TIW Valve And Head Pin - Rig Up
Manifold For Circle Chart Recorder - Install Circulating Hose -
Line Up Equipment To Reverse Circulate Inhibited Sea Water
And Diesel - Clear Rig Floor Of Casing Tools, Tongs, And
Associated Equipment
14:00 - 17:00 3.00 RUNCOrvP COMP Reverse Circulate 151 Barrels Inhibiated Seawater And 138
Barrels Of Diesel At 3 BPM - U-Tube Annulus To Tubing
17:00 - 17:30 0.50 RUNCOrvP COMP Hold Pre-Job Safety Meeting - Land FMC Tubing Hanger And
Energize Lock Down Studs
17:30 - 19:30 2.00 RUNCOrvP COMP Hold Pre-Job Safety Meeting - Record On Pressure Chart The
Test On Tubing For 30 Minutes At 4,000 Psi. - Bleed To 2,500
Psi. - Pressure Test Annulus At 4,000 Psi. For 30 Minutes -
Bleed Annulus To 0 Psi. And Bleed Tubing To 0 Psi.
*NOTE*
The AOGCC Plans To Witness A Test After Injection Process
Started And Warmed Up.
19:30 - 22:00 2.50 BOPSUR P COMP Hold Pre-Job Safety Meeting - Back Out Land Joint And Break
Off Cross Over - Pick Up T-Bar And Install Cameron Two Way
Check Valve - RIH With Landing Joint Stop Above Tubing
Hanger - Pump Down Kill Line And Landing Joint And Float
Out Diesel From BOP Equipment - Close Annular Element And
Blow Air Into Kill Line Pushing Fluid Up Landing Joint - Open
Annular And Lay Down Landing Joint
22:00 - 00:00 2.00 BOPSURP COMP Nipple Down 13 5/8 5M BOP Stack And Related Equipment
9/3/2002 00:00 - 03:00 3.00 WHSUR P COMP INSTALL ADAPTER FLANGE & TREE
03:00 - 04:00 1.00 WHSUR P COMP TEST ADAPTER FLANGE & TREE TO 5000 PSI.
04:00 - 05:00 1.00 WHSUR P COMP R/U DSM. PULL TWC. INSTALL BPV.
05:00 - 06:00 1.00 WHSUR P COMP N/D SWAB VALVE ON TREE, CLEAN CELLAR AREA,
SECURE WELL. RELEASE RIG FROM PSI-10 @ 06:00 HRS.
Printed: 9/4/2002 10:55:43 AM
')
)
Well:
Field:
API:
Permit:
PSI-10
Prudhoe Bay Unit
50-029-23110-00
202-159
Rig Accept: 08/10/02
Rig Spud: 08/10/02
Rig Release: 09/03/02
Drilling Rig: Nabors 27E
POST RIG WORK
10/09/02
PULLED BALL & ROD. PULLED 4 1/2" RHC-M PLUG BODY. PULLED 7" REDUCING NIPPLE. DRIFT TBG &
TAG FILL W/ 10' LONG 3.5" DMY GN @ 11,680' WLMD. RETRIEVE SAMPLE OF SOFT CEMENT. WELL TO
REMAIN SHUT IN.
10/14/02
LOGGED TEMP/PRESSURE AND JEWELRY ON 1ST RIH. TAGGED TD AT 11712 FT MD ON 1ST RIH WITH
1.6875" MAX OD. 2ND RIH : TAGGED TD AT 11709 FT MD WITH 3.375" MAX OD. PERFORATED 11688-
11708 FT MD WITH 33/8" 3406 POWERJETS @ 6 SPF. LEFT WELL SHUT IN - INFORMED DSO. WILL FINISH
PERFS TOMORROW. DID NOT PERFORATE THE BOTTOM 10' DUE TO FILL IN WELL. COULD NOT GET ALL
THE WAY DOWN.
10/15/02
RIH W/ 3 3/8" HSD, 6 SPF, PJ/ TAGGED TD @ 11709'. PERFORATED 11620'-11666' IN TWO RUNS. RIH W/
PSP STRING. LOGGED STATIC BHP&T @ 11630' MD (8422 TVD), BHP= 3398.2 PSI, BHT= 165.9 DEGF.
POOH, RDMO, LEFT WELL SHUT IN, NOTIFIED DSO OF STATUS. JOB COMPLETE, WELL READY TO POP.
11/11/02
T/I/0=850/0+/350 MITIA TO 2100 PSI PASSED (AOGCC WITNESSED, JEFF JONES); INITIAL IA FL AT
SURFACE. MITIA LOST 5 PSI IN THE FIRST 15 MINUTES AND 5 PSI IN THE SECOND 15 MINUTES FOR A
TOTAL OF 10 PSI IN 30 MINUTES. PUMPED 3 BBLS OF 60/40 METHANOL DOWN THE IA. FINAL WHP'S =
850/300/350.
')
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITVE
Re: Distribution of Survey Data for Well PSI-10 GYRO
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
0.00' MD
, M D (if applicable)
0.00 I MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
)
a ~~ )-5{
05-0ct-02
RECE\VED
OCT 0 9 2002
AlasKa ar. & Gas Cons. Commi88ion
Andø8ge
Sperry-Sun Drilling Services
North Slope Alaska
BPXA
Lisburne PSI (East Dock), Slot PSI slot J
PSI-10 Gyro
Job No. AKF022135, Surveyed: 27 August, 2002
Survey Report
1 October, 2002
Your Ref: API 500292311000
Surface Coordinates: 5966189.90 N, 708081.03 E (70018' 39.5321" N, 148018'49.2857" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 966189.90 N, 208081.03 E (Grid)
Surface Coordinates relative to Structure: 141.59 N, 324.07 E(True)
Kelly BushIng: SO.45ft above Mean Sea Level
Elevation relative to Project V Reference: 50.45ft
ElevatIon relative to structure: 50.45ft
"i....~r"\I-!!iU"
q'AI~\L;1~.~ SJ¡:RVICaS
A Halliburton Company
) :.:: \J r~VE
~.
-
Survey Ref: svy11268
Sperry-Sun Drilling Services
Survey Report for Lisburne PSI (East Dock) .. PSI-10 Gyro
Your Ref: API 500292311000
Job No. AKF022135, Surveyed: 27 August, 2002
): t:! ,\, , ! -- V'-:
... í ~ I ,...'
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
0.00 0.000 0.000 -50.45 0.00 O.OON O.OOE 5966189.90 N 708081.03 E 0.00 Tolerable Gyro
159.00 0.500 98.000 108.55 159.00 0.10S 0.69E 5966189.82 N 708081.72 E 0.314 ~0.38
252.00 0.500 50.000 201.54 251.99 0.11 N 1.40 E 5966190.05 N 708082.43 E 0.437 -0.49
350.00 1.500 3.000 299.53 349.98 1.66 N 1.79 E 5966191.61 N 708082.78 E 1.240 0.75
440.00 2.350 356.000 389.48 439.93 4.68N 1.73 E 5966194.63N 708082.63 E 0.978 3.52
543.00 3.800 354.000 492.33 542.78 10.18 N 1.22 E 5966200.11 N 708081.97 E ~
1.411 8.72
716.00 6.500 358.000 664.61 715.06 25.67 N 0.28 E 5966215.57 N 708080.60 E 1.573 23.16
908.00 8.300 350.000 855.01 905.46 50.18 N 2.50W 5966239.99 N 708077.14 E 1.078 46.57
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to PSI slot J. Northings and Eastings are relative to PSI slot J.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from PSI slot J and calculated along an Azimuth of 335.080° (True).
Magnetic Declination at Surface is 26.354°(08-Aug-02)
Based upon Minimum Curvature type calculations, at a Measured Depth of 908.00ft.,
The Bottom Hole Displacement is 50.25ft., in the Direction of 357.144° (True).
Survey too/prOgram for PS/-10 Gvro
",.--....
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth
(ft) (ft)
~
Survey Tool Description
0.00
0.00
908.00
905.46 Tolerable Gyro
1 October, 2002 - 16:19
Page 20f2
DrillQuest 3.03.02.002
)
)
c;{ CQ- /5~
05-0ct-02
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITVE
Re: Distribution of Survey Data for Well PSI-10
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
0.00' MD
I M D (if applicable)
11,809.00' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
RECEIVED
Attachment(s)
OCT 0 9 2002
AlI8ka OH & Gas Cons. Commi88ion
And10rage
Sperry-Sun Drilling Services
North Slope Alaska
. BPXA
Lisburne PSI (East Dock), Slot PSI slot J
PSI-10
Job No. AKZZ22135, Surveyed: 27 August, 2002
Survey Report
1 October, 2002
Your Ref: API 500292311000
Surface Coordinates: 5966189.90 N, 708081.03 E (70018' 39.5321" N, 148018'49.2857" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Surface Coordinates relative to Project H Reference: 966189.90 N, 208081.03 E (Grid)
Surface Coordinates relative to Structure: 141.59 N, 324.07 E(True)
Kelly Bushing: SO. 45ft above Mean Sea Level
Elevation relative to Project V Reference: 50. 45ft
Elevation relative to Structure: 50. 45ft
.i.'~~I.... .'r'y-SU"
-=-'R I L L1N q¡ .-, ~ A VIt:o En,;
A Halliburton Company
D-:Fl\ 'T1VE
.~
.~
Survey Ref: svy11323
Sperry-Sun Drilling Services
Survey Report for Lisburne PSI (East Dock) - PSI-10 )E '-¡'~¥"ìV-
Your Ref: API 500292311000
Job No. AKZZ2213S, Surveyed: 27 August, 2002 - .. -
¡
:. :;; . usa
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
908.00 8.300 350.000 855.01 905.46 50.18 N 2.50W 5966239.99 N 708077.14 E 46.57 AK-6 BPJFR-AK
1 041 .62 11.110 341.000 986.71 1037.16 71.86 N 8.37W 5966261.50 N 708070.67 E 2.384 68.70
1134.60 11.310 341.300 1077.92 1128.37 88.97 N 14.21 W 5966278.44 N 708064.36 E 0.224 86.67
1227.36 12.660 342.090 1168.66 1219.11 107.25 N 20.25 W 5966296.55 N 708057.81 E 1 .466 105.80
1323.47 16.110 344.890 1261.74 1312.19 130.16 N 26.97 W 5966319.26 N 708050.46 E 3.661 129.40
1414.56 18.220 341.780 1348.77 1399.22 155.89 N 34.72W 5966344.77 N 708042.01 E 2.525 156.00 ~
1509.77 20.270 342.940 1438.65 1489.10 185.80 N 44.21 W 5966374.40 N 708031.69 E 2.190 187.13
1603.41 20.330 344.980 1526.48 1576.93 217 .01 N 53.19 W 5966405.36 N 708021.85 E 0.758 219.22
1694.97 17.840 344.730 1613.00 1663.45 245.91 N 61.00 W 5966434.03 N 708013.24 E 2.721 248.72
1790.16 17.780 347.760 1703.63 1754.08 274.18 N 67.92 W 5966462.09 N 708005.53 E 0.976 277.27
1883.92 18.470 347.560 1792.74 1843.19 302.67 N 74.16 W 5966490.40 N 707998.51 E 0.739 305.74
1977.81 19.790 349.010 1881.44 1931.89 332.80 N 80.39 W 5966520.35 N 707991.45 E 1.494 335.69
2070.43 24.560 348.580 1967.19 2017.64 367.08 N 87.20 W 5966554.42 N 707983.69 E 5.153 369.65
2104.68 26.690 348.880 1998.06 2048.51 381.61 N 90.09 W 5966568.86 N 707980.40 E 6.230 384.04
2133.32 28.150 349.230 2023.49 2073.94 394.56 N 92.59 W 5966581.74 N 707977.54 E 5.129 396.84
2162.50 29.560 348.490 2049.04 2099.49 408.37 N 95.32 W 5966595.47 N 707974.43 E 4.985 410.51
2254.86 31.710 346.630 2128.51 2178.96 454.32 N 105.48 W 5966641.12 N 707963.01 E 2.544 456.46
2350.69 33.760 342.070 2209.13 2259.58 504.17 N 119.50 W 5966690.56 N 707947.60 E 3.345 507.58
2441.62 34.71 0 338.080 2284.31 2334.76 552.23 N 136.95 W 5966738.12 N 707928.83 E 2.680 558.52
2536.65 34.840 334.780 2362.38 2412.83 601.89 N 158.62 W 5966787.17 N 707905.80 E 1.985 612.69
2630.67 35.490 335.730 2439.24 2489.69 651.07 N 181.28 W 5966835.70 N 707881.78 E 0.904 666.83
2725.72 38.4 70 335.210 2515.16 2565.61 703.07 N 205.02 W 5966887.02 N 707856.61 E 3.152 724.00
2820.49 40.690 333.080 2588.20 2638.65 757.39 N 231.37 W 5966940.59 N 707828.76 E 2.745 784.37 '--'
2913.59 43.010 330.740 2657.55 2708.00 812.16 N 260.64 W 5966994.53 N 707797.99 E 3.003 846.37
3009.12 45.090 329.070 2726.21 2776.66 869.62 N 293.96 W 5967051.04 N 707763.09 E 2.493 912.51
3103.19 48.370 329.520 2790.68 2841 .13 928.50 N 328.92 W 5967108.93 N 707726.51 E 3.504 980.65
3197.95 51.260 332.170 2851.82 2902.27 991.73 N 364.15 W 5967171.15 N 707689.54 E 3.723 1052.83
3288.98 52.820 333.720 2907.82 2958.27 1055.64 N 396.78 W 5967234.14 N 707655.15 E 2.177 1124.54
3384.19 52.850 334.210 2965.34 3015.79 1123.82 N 430.08 W 5967301.37 N 707619.97 E 0.411 1200.40
3479.48 52.870 335.300 3022.87 3073.32 1192.52 N 462.48 W 5967369.15 N 707585.69 E 0.912 1276.36
3572.69 53.220 335.740 3078.91 3129.36 1260.31 N 493.34 W 5967436.06 N 707552.96 E 0.532 1350.84
3666.73 54.720 336.170 3134.22 3184.67 1329.76 N 524.32 W 5967504.62 N 707520.06 E 1.637 1426.88
3760.46 53.280 335.750 3189.31 3239.76 1399.01 N 555.21 W 5967572.99 N 707487.27 E 1.579 1502.70
3854.68 52.810 335.520 3245.96 3296.41 1467.60 N 586.27 W 5967640.69 N 707454.32 E 0.536 1577.99
3948.51 50.320 334.250 3304.28 3354.73 1534.15N 617.45 W 5967706.35 N 707421.31 E 2.858 1651.48
1 October, 2002 - 16:20 Page 2 of6 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services ) :F1NIT 'V':
Survey Report for Lisburne PSI (East Dock) - PSI-10
Your Ref: API 500292311000
Job No. AKZZ22135, Surveyed: 27 August, 2002
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
4041.06 49.560 332.790 3363.85 3414.30 1597.55 N 649.03 W 5967768.85 N 707387.98 E 1 .460 1722.28
4136.65 50.210 333.970 3425.44 3475.89 1662.90 N 681.78 W 5967833.27 N 707353.43 E 1.163 1795.35
4231.14 50.120 333.290 3485.97 3536.42 1727.91 N 714.01 W 5967897.36 N 707319.42 E 0.561 1867.88
4320.49 50.270 335.150 3543.17 3593.62 1789.71 N 743.86 W 5967958.31 N 707287.87 E 1.608 1936.51
4415.12 51.070 335.210 3603.14 3653.59 1856.15 N 774.58 W 5968023.87 N 707255.31 E 0.847 2009.71
4508.40 51 .820 335.990 3661.28 3711.73 1922.58 N 804.72 W 5968089.44 N 707223.35 E 1.036 2082.65 "-'"
4604.26 50.690 333.920 3721.28 3771.73 1990.31 N 836.35 W 5968156.27 N 707189.85 E 2.056 2157.41
4699.90 50.150 333.040 3782.22 3832.67 2056.27 N 869.26 W 5968221.29 N 707155.13 E. 0.906 2231.09
4792.59 50.540 333.750 3841.37 3891.82 2120.07 N 901.22 W 5968284.19 N 707121.41 E 0.724 2302.42
4887.20 51 .000 333.260 3901.20 3951.65 2185.66 N 933.92 W 5968348.84 N 707086.91 E 0.630 2375.68
4980.17 51.620 334.400 3959.32 4009.77 2250.79 N 965.92 W 5968413.06 N 707053.12 E 1.167 2448.22
5073.79 52.630 335.400 4016.80 4067.25 2317.71 N 997.26 W 5968479.09 N 707019.93 E 1.369 2522.12
5163.40 53.330 335.460 4070.75 4121.20 2382.78 N 1027.01 W 5968543.31 N 706988.39 E 0.783 2593.67
5258.43 52.510 332.380 4128.06 4178.51 2450.86 N 1060.32 W 5968610.44 N 706953.21 E 2.726 2669.45
5351.67 52.430 332.340 4184.86 4235.31 2516.37 N 1094.62 W 5968674.97 N 706917.10 E 0.092 2743.31
5447.68 53.070 332.930 4242.97 4293.42 2584.24 N 1129.75 W 5968741.84 N 706880.11 E 0.827 2819.66
5541.24 52.670 333.260 4299.45 4349.90 2650.76 N 1163.51 W 5968807.40 N 706844.52 E 0.512 2894.21
5634.26 53.480 334.130 4355.33 4405.78 2717.42 N 1196.46 W 5968873.12 N 706809.74 E 1.148 2968.55
5729.17 51.220 331.790 4413.31 4463.76 2784.35 N 1230.59 W 5968939.08 N 706773.76 E 3.079 3043.63
5823.13 50.080 332.390 4472.88 4523.33 2848.55 N 1264.60 W 5969002.32 N 706737.98 E 1.310 3116.19
5916.22 50.400 333.450 4532.42 4582.87 2912.27 N 1297.18 W 5969065.10 N 706703.66 E 0.940 3187.69
6011.98 50.890 332.840 4593.14 4643.59 2978.32 N 1330.63 W 5969130.21 N 706668.39 E 0.710 3261.70
6110.66 51.330 332.250 4655.10 4705.55 3046.48 N 1366.04 W 5969197.36 N 706631.10 E 0.645 3338.43 ~
6209.31 51.130 331.410 4716.87 4767.32 3114.28 N 1402.35 W 5969264.13 N 706592.93 E 0.694 3415.22
6304.83 51.260 331.520 4776.73 4827.18 3179.68 N 1437.91 W 5969328.51 N 706555.57 E 0.163 3489.50
6397.45 50.170 331.480 4835.38 4885.83 3242.68 N 1472.11 W 5969390.54 N 706519.63 E 1.177 3561.05
6490.91 49.860 331 .220 4895.43 4945.88 3305.52 N 1506.45 W 5969452.41 N 706483.57 E 0.394 3632.51
6583.71 50.100 332.560 4955.11 5005.56 3368.20 N 1539.93 W 5969514.14 N 706448.37 E 1.136 3703.4 7
6673.80 50.640 333.620 5012.57 5063.02 3430.07 N 1'571.33 W 5969575.12 N 706415.26 E 1.086 3772.81
6768.18 50.630 335.030 5072.43 5122.88 3495.83 N 1602.94 W 5969639.98 N 706381.84 E 1.155 3845.77
6862.56 51.270 337.280 5131.90 5182.35 3562.87 N 1632.56 W 5969706.16 N 706350.37 E 1.972 3919.04
6956.61 55.030 339.280 5188.30 5238.75 3632.78 N 1660.38 W 5969775.28 N 706320.63 E 4.345 3994.16
7051.98 54.960 340.660 5243.01 5293.46 3706.17 N 1687.13 W 5969847.90 N 706291.85 E 1.187 4071.99
7146.06 54.430 340.120 5297.38 5347.83 3778.49 N 1712.90 W 5969919.48 N 706264.09 E 0.733 4148.44
7241.58 53.460 339.980 5353.60 5404.05 3851.08 N 1739.25 W 5969991.31 N 706235.74 E 1.022 4225.37
1 October, 2002 - 16:20 Page 3 of6 DriJ/Quest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Lisburne PSI (East Dock) - PSI-10
Your Ref: API 500292311000
Job No. AKZZ22135, Surveyed: 27 August, 2002
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Inct. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft)
7335.43 53.600 339.290 5409.38 5459.83 3921.83 N 1765.51 W 5970061.31 N 706207.53 E 0.610 4300.60
7431.04 53.000 337.900 5466.52 5516.97 3993.20 N 1793.48 W 5970131.87 N 706177.59 E 1.324 4377.11
7523.38 54.980 334.680 5520.82 5571.27 4061.56 N 1823.53 W 5970199.38 N 706145.66 E 3.543 4451.77
7617.72 54.830 333.820 5575.06 5625.51 4131.09 N 1857.07 W 5970267.94 N 706110.21 E 0.763 4528.95
7712.08 54.300 334.580 5629.77 5680.22 4200.30 N 1890.53 W 5970336.21 N 706074.84 E 0.864 4605.82
5684.69 5735.14 4268.06 N 1922.98 W 5970403.04 N 706040.53 E ~
7805.15 53.360 334.240 1.052 4680.95
7899.17 53.360 335.700 5740.81 5791.26 4336.42 N 1954.90 W 5970470.49 N 706006.73 E 1.246 4756.38
7993.48 53.380 336.730 5797.08 5847.53 4405.67 N 1985.42 W 5970538.87 N 705974.30 E 0.877 4832.05
8085.92 52.980 336.860 5852.48 5902.93 4473.69 N 2014.58 W 5970606.05 N 705943.27 E 0.447 4906.02
8180.05 53.230 335.650 5908.99 5959.44 4542.59 N 2044.89 W 5970674.08 N 705911.06 E 1.062 4981.28
8272.99 53.650 335.040 5964.35 6014.80 4610.44 N 2076.03 W 5970741.04 N 705878.05 E 0.694 5055.93
8366.75 53.840 336.150 6019.80 6070.25 4679.29 N 2107.27 W 5970809.00 N 705844.91 E 0.976 5131.53
8460.50 53.590 335.880 6075.28 6125.73 4748.33 N 2137.99 W 5970877.17 N 705812.29 E 0.354 5207.09
8552.77 53.830 335.830 6129.89 6180.34 4816.20 N 2168.41 W 5970944.16 N 705780.00 E 0.264 5281.46
8648.60 54.180 334.280 6186.21 6236.66 4886.49 N 2201.11 W 5971013.53 N 705745.37 E 1.359 5358.99
8742.49 55.010 333.030 6240.61 6291.06 4955.07 N 2235.08 W 5971081.13 N 705709.52 E 1.400 5435.49
8834.80 54.720 333.250 6293.74 6344.19 5022.41 N 2269.18 W 5971147.51 N 705673.56 E 0.370 5510.94
8929.18 54.560 333.150 6348.35 6398.80 5091.11 N 2303.89 W 5971215.22 N 705636.96 E 0.190 5587.86
9022.68 54.950 333.020 6402.31 6452.76 5159.20 N 2338.45 W 5971282.33 N 705600.52 E 0.432 5664.18
9117.89 54.730 333.560 6457.14 6507.59 5228.74 N 2373.44 W 5971350.86 N 705563.62 E 0.518 5741.98
9212.69 54.300 333.500 6512.17 6562.62 5297.84 N 2407.85 W 5971418.98 N 705527.31 E 0.457 5819.14
;<1--' 9305.56 54.090 333.560 6566.50 6616.95 5365.26 N 2441.42 W 5971485.45 N 705491.89 E 0.232 5894.43
9399.52 53.810 333.710 6621.80 6672.25 5433.32 N 2475.15 W 5971552.56 N 705456.28 E 0.325 5970.38 '~
9492.87 54.050 333.450 6676.76 6727.21 5500.90 N 2508.73 W 5971619.17 N 705420.84 E 0.342 6045.81
9579.27 54.130 334.030 6727.43 6777.88 5563.65 N 2539.69 W 5971681.05 N 705388.16 E 0.552 6115.76
9678.88 53.900 333.030 6785.96 6836.41 5635.80 N 2575.61 W 5971752.17 N 705350.25 E 0.845 6196.34
9772.34 52.350 332.400 6842.04 6892.49 5702.25 N 2609.88 W 5971817.64 N 705314.15 E 1.744 6271.03
9864.77 50.180 332.140 6899.87 6950.32 5766.06 N 2643.43 W 5971880.51 N 705278.85 E 2.358 6343.04
9958.88 48.850 331.750 6960.97 7011.42 5829.23 N 2677.09 W 5971942.72 N 705243.45 E 1 .448 6414.51
10052.61 46.140 331.160 7024.30 7074.75 5889.93 N 2710.10 W 5972002.48 N 705208.77 E 2.928 6483.46
10146.74 43.340 331.210 7091.15 7141.60 5947.98 N 2742.03 W 5972059.62 N 705175.25 E 2.975 6549.56
10241.27 42.840 331.340 7160.19 7210.64 6004.61 N 2773.07 W 5972115.36 N 705142.65 E 0.537 6614.00
10334.59 40.940 331.740 7229.65 7280.10 6059.38 N 2802.76 W 5972169.30 N 705111.45 E 2.056 6676.18
10428.25 38.420 331.820 7301.73 7352.18 6112.07 N 2831.04 W 5972221.18 N 705081.72 E 2.691 6735.88
10523.55 36.170 331.920 7377.54 7427.99 6162.99 N 2858.26 W 5972271.33 N 705053.10 E 2.362 6793.53
1 October, 2002 - 16:20 Page 4 of6 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services ) EC.'\JfTfVE
Survey Report for Lisburne PSI (East Dock) - PSI-10
Your Ref: API 500292311000
Job No. AKZZ22135, Surveyed: 27 August, 2002
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
10617.73 34.650 333.940 7454.30 7504.75 6211.57 N 2883.11 W 5972319.20 N 705026.92 E 2.037 6848.06
10711.86 34.220 333.500 7531.93 7582.38 6259.29 N 2906.67 W 5972366.25 N 705002.04 E 0.528 6901.27
10806.07 32.460 333.920 7610.64 7661.09 6305.71 N 2929.61 W 5972412.02 N 704977.82 E 1.884 6953.03
10900.34 28.700 333.110 7691.78 7742.23 6348.64 N 2950.98 W 5972454.33 N 704955.28 E 4.012 7000.96
10992.91 25.430 334.400 7774.20 7824.65 6386.40 N 2969.62 W 5972491.56 N 704935.59 E 3.589 7043.06
6422.08 N 2986.65 W 5972526.76 N '-'
11088.51 23.440 334.580 7861.24 7911.69 704917.58 E 2.083 7082.60
11182.76 21 .660 334.060 7948.28 7998.73 6454.66 N 3002.31 W 5972558.89 N 704901.02 E 1.900 7118.74
11278.36 19.760 333.760 8037.69 8088.14 6485.02 N 3017.18 W 5972588.83 N 704885.32 E 1.991 7152.54
11366.07 18.740 333.500 8120.50 8170.95 6510.93 N 3030.02 W 5972614.37 N 704871.77 E 1.167 7181.45
11460.01 17.570 336.130 8209.76 8260.21 6537.40 N 3042.49 W 5972640.49 N 704858.57 E 1.520 7210.71
11551.30 17.000 336.170 8296.93 8347.38 6562.21 N 3053.46 W 5972664.98 N 704846.92 E 0.625 7237.83
11645.55 16.620 336.810 8387.15 8437.60 6587.20 N 3064.33 W 5972689.67 N 704835.36 E 0.448 7265.08
11721.15 16.270 337.340 8459.66 8510.11 6606.91 N 3072.67 W 5972709.14 N 704826.4 7 E 0.504 7286.47
11809.00 16.270 337.340 8543.99 8594.44 6629.63 N 3082.15 W 5972731.58 N 704816.37 E 0.000 7311.06 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to PSI slot J. Northings and Eastings are relative to PSI slot J.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from PSI slot J and calculated along an Azimuth of 335.080° (True).
--
Magnetic Declination at Surface is 26.354°(08-Aug-02)
Based upon Minimum Curvature type calculations, at a Measured Depth of 11809.00ft.,
The Bottom Hole Displacement is 7311.06f1., in the Direction of 335.066° (True).
.~
1 October, 2002 - 16:20
Page 50f6
DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Lisburne PSI (East Dock) - PSI-10
Your Ref: API 500292311000
Job No. AKZZ22135,Surveyed: 27 Augu~;t, 2002
JEF'NIT'V~
BPXA
North Slope Alaska
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
11809.00
8594.44
6629.63 N
3082.15 W
Projected Survey
~
Survey tool program for PSI-10
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth
(ft) (ft)
Survey Tool Description
0.00
908.00
0.00 908.00
905.46 11809.00
905.46 Tolerable Gyro(PSI-10 Gyro)
8594.44 AK-6 BP _IFR-AK(PSI-10)
.~.
~
1 October, 2002 - 16:20
Page 60f6
DrillQuest 3.03.02.002
')
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well PSI-10 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
0.00 I MD
'MD (if applicable)
11,809.00 I MD
)
~Od--}51
05-0ct-02
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
OCT 0 9 200,
Alaska OR & Gas Cons. Commi88ion
Ancbor8ge
Sperry-Sun Drilling Services
North Slope Alaska
BPXA
Lisburne PSI (East Dock), Slot PSI slot J
PSI-10 MWD
Job Ho. AKMW22135, Surveyed: 8 August, 2002
Survey Report
1 October, 2002
Your Ref: API 500292311000
Surface Coordinates: 5966189.90 H, 708081.03 E (70018' 39.5321H H, 148018' 49.2857H W)
Grid Coordinate System: HAD27 Alaska State Planes, Zone 4
'~/
Surface Coordinates relative to Project H Reference: 966189.90 H, 208081.03 E (Grid)
Surface Coordinates relative to Structure: 141.59 H, 324.07 E(True)
Kelly Bushing: 60.46ft above Mean Sea Level
Elevation relative to Project V Reference: 50.45ft
Elevation re/ativeto Structure: 50. 45ft
!!I~".'.'.."Y-SU"
DRn...LI~G ."'.SE=À"'C.Nes
A Halliburton Company
Survey Ref: svy11324
Sperry-Sun Drilling Services
SUlVey Report for Lisburne PSI (East Dock) - PSI-10 MWD
Your Ref: API 600292311000
Job No. AKMW2213S, Surveyed: B Augu$t, 2002
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
908.00 8.300 350.000 855.01 905.46 50.18 N 2.50W 5966239.99 N 708077.14 E 46.57 MWD Magnetic
1 041 .62 11.110 341.690 986.71 1037.16 71.91 N 8.22W 5966261.55 N 708070.82 E 2.345 68.68
1134.60 11.310 341.600 1077.92 1128.37 89.07 N 13.92 W 5966278.55 N 708064.65 E 0.216 86.64
1227.36 12.660 342.430 1168.65 1219.10 107.39 N 19.86 W 5966296.70 N 708058.21 E 1 .467 105.76
1323.47 16.110 345.300 1261.74 1312.19 130.33 N 26.42 W 5966319.45 N 708051.01 E 3.664 129.33
1414.56 18.220 341.880 1348.77 1399.22 156.10 N 34.06 W 5966344.99 N 708042.66 E 2.567 155.91
1509.77 20.270 343.100 1438.65 1489.10 186.03 N 43.48 W 5966374.65 N 708032.41 E 2.194 187.03
1603.41 20.330 344.820 1526.48 1576.93 217.24 N 52.46 W 5966405.61 N 708022.57 E 0.640 219.12
1694.97 17 .840 344.730 1613.00 1663.45 246.13 N 60.32 W 5966434.26 N 708013.92 E 2.720 248.63
1790.16 17.780 347.440 1703.63 1754.08 274.38 N 67.32 W 5966462.31 N 708006.13 E 0.873 277.20
1883.92 18.4 70 347.380 1792.74 1843.19 302.85 N 73.68 W 5966490.59 N 707998.99 E 0.736 305.70
1977.81 19.790 349.070 1881.44 1931.89 332.97 N 79.94 W 5966520.53 N 707991.89 E 1.524 335.65
2070.43 24.560 348.400 1967.18 2017.63 367.24 N 86.79 W 5966554.59 N - 707984.10 E 5.157 369.62
2104.68 26.690 348.570 1998.06 2048.51 381.75 N 69.74 W ,5966569.02 N 707980.74 E 6.223 384.02
2133.32 28.150 349.010 2023.49 2073.94 394.69 N 92.31 W 5966581.88 N 707977.82 E 5.147 396.84
2162.50 29.560 348.600 2049.04 2099.49 408.50 N 95.04 W 5966595.61 N 707974.71 E 4.879 410.52
2254.86 31.710 346.930 2128.51 2178.96 454.49 N 105.03 W 5966641.30 N 707963.44 E 2.503 456.43
2350.69 33.760 342.360 2209.13 2259.58 504.41 N 118.80 W 5966690.82 N 707948.30 E 3.349 507.50
2441.62 34.710 338.120 2284.31 2334.76 552.52 N 136.11 W 5966738.43 N 707929.66 E 2.823 558.43
2536.65 34.840 334.790 2362.38 2412.83 602.19 N 157.76 W 5966787.49 N 707906.65 E 2.003 612.59
2630.67 35.490 336.130 2439.24 2489.69 651.45 N 180.24 W 5966836.10 N 707882.81 E 1.073 666.74
2725.72 38.4 70 335.150 2515.16 2565.61 703.52 N 203.84 W 5966887.50 N 707857.78 E 3.196 723.90
2820.49 40.690 333.170 2588.20 2638.65 757.84 N 230.17 W 5966941.07 N 707829.95 E 2.694 784.27
2913.59 43.010 331.320 2657.55 2708.00 812.79 N 259.11 W 5966995.20 N 707799.49 E 2.822 846.30
3009.12 45.090 329.660 2726.21 2776.66 870.58 N 291.84 W 5967052.06 N 707765.18 E 2.490 912.49
3103.19 48.370 330.250 2790.68 2841.13 929.87 N 326.12 W 5967110.37 N 707729.27 E 3.517 980.71
3197.95 51.260 333.480 2851.83 2902.28 993.70 N 360.21 W 5967173.24 N 707693.42 E 4.010 1052.96
3288.98 52.820 334.320 2907.82 2958.27 1058.16 N 391.78 W 5967236.80 N 707660.08 E 1.862 1124.72
3384.19 52.850 333.600 2965.34 3015.79 1126.33 N 425.09 W 5967304.02 N 707624.90 E 0.603 1200.57
3479.48 52.870 333.800 3022.87 3073.32 1194.43 N 458.74 W 5967371.16 N 707589.37 E 0.169 1276.51
3572.69 53.220 334.910 3078.91 3129.36 1261.57 N 490.98 W 5967437.38 N 707555.29 E 1.023 1350.99
3666.73 54.720 335.860 3134.22 3184.67 1330.71 N 522.65 W 5967505.62 N 707521.71 E 1.792 1427.04
3760.46 53.280 335.300 3189.31 3239.76 1399.76 N 553.99 W 5967573.77 N 707488.47 E 1.611 1502.86
3854.68 52.810 335.360 3245.96 3296.41 1468.18 N 585.42 W 5967641.29 N 707455.16 E 0.501 1578.15
3948.51 50.320 334.120 3304.28 3354.73 1534.64 N 616.77 W 5967706.87 N 707421.98 E 2.848 1651.64
1 October, 2002 - 16:20 Page 2 0'6 Drill Quest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for LIsburne PSI (East Dock) - PSI-10 MWD
Your Ref: APlS00292311000
Job No. AKMW2213~, Surveyed: 8 August, 2002
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
4041.06 49.560 332.300 3363.85 3414.30 1597.87 N 648.69 W 5967769.19 N 707388.32 E 1.714 1722.43
4136.65 50.210 334.710 3425.44 3475.89 1663.29 N 681.29 W 5967833.68 N 707353.92 E 2.044 1795.50
4231.14 50.120 334.610 3485.97 3536.42 1728.87 N 712.34 W 5967898.37 N 707321.06 E 0.125 1868.05
4320.49 50.270 335.850 3543.17 3593.62 1791.19 N 741.10 W 5967959.87 N 707290.59 E 1.079 1936.69
4415.12 51.070 336.020 3603.15 3653.60 1858.03 N 770.94 W 5968025.85 N 707258.90 E 0.857 2009.88
4508.40 51.820 336.300 3661.29 3711.74 1924.75 N 800.43 W 5968091.73 N 707227.58 E 0.838 2082.81 ~"
4604.26 50.690 334.320 3721.28 3771.73 1992.68 N 831.64 W 5968158.77 N 707194.49 E 1.996 2157.57
4699.90 50.1 50 333.290 3782.22 3832.67 2058.82 N 864.18 W 5968223.98 N 707160.14 E 1.004 2231.26
4792.59 50.540 333.860 3841.37 3891.82 2122.73 N 895.94 W 5968286.99 N 707126.62 E 0.633 2302.60
4887.20 51 .000 333.460 3901.21 3951.66 2188.40 N 928.45 W 5968351.74 N 707092.30 E 0.586 2375.86
4980.17 51.620 334.640 3959.33 4009.78 2253.65 N 960.20 W 5968416.08 N 707058.75 E 1.194 2448.41
5073.79 52.630 335.590 4016.80 4067.25 2320.69 N 991.30 W 5968482.23 N 707025.81 E 1.344 2522.31
5163.40 53.330 336.050 4070.76 4121.21 2385.96 N 1020.60 W 5968546.66 N 706994.71 E 0.882 2593.85
5258.43 52.510 333.190 4128.06 4178.51 2454.45 N 1053.08 W 5968614.23 N 706960.34 E 2.551 2669.65
5351.67 52.430 333.700 4184.86 4235.31 2520.59 N 1086.14 W 5968679.43 N 706925.47 E 0.442 2743.56
5447.68 53.070 335.960 4242.98 4293.43 2589.75 N 1118.63 W 5968747.66 N 706891.07 E 1.989 2819.98
5541.24 52.670 333.580 4299.46 4349.91 2657.22 N 1150.42 W 5968814.22 N 706857.43 E 2.073 2894.56
5634.26 53.480 335.190 4355.34 4405.79 2724.27 N 1182.56 W 5968880.36 N 706823.44 E 1.635 2968.91
5729.17 51.220 332.560 4413.32 4463.77 2791.74 N 1215.62 W 5968946.88 N 706788.52 E 3.238 3044.02
5823.13 50.080 332.950 4472.90 4523.35 2856.33 N 1248.88 W 5969010.53 N 706753.48 E 1.255 3116.62
5916.22 50.400 333.750 4532.43 4582.88 2920.29 N 1280.98 W 5969073.58 N 706719.63 E 0.745 3188.15
6011.98 50.890 332.730 4593.16 4643.61 2986.40 N 1314.32 W 5969138.74 N 706684.47 E 0.970 3262.15
6110.66 51 .330 332.290 4655.11 4705.56 3054.54 N 1349.77 W 5969205.86 N 706647.14 E 0.565 3338.88 .~
6209.31 51 .130 331.670 4716.89 4767.34 3122.44 N 1385.91 W 5969272.74 N 706609.14 E 0.530 3415.68
6304.83 51.260 332.060 4776.75 4827.20 3188.08 N 1421.01 W 5969337.38 N 706572.23 E 0.346 3490.00
6397.45 50.170 333.730 4835.39 4885.84 3251.88 N 1453.67 W 5969400.26 N 706537.81 E 1.825 3561.63
6490.91 49.860 332.970 4895.45 4945.90 3315.89 N 1485.79 W 5969463.34 N 706503.93 E 0.706 3633.21
6583.71 50.1 00 334.870 4955.13 5005.58 3379.71 N 1517.03 W 5969526.28 N 706470.94 E 1.589 3704.26
6673.80 50.640 334.810 5012.59 5063.04 3442.51 N 1546.53 W 5969588.24 N 706439.71 E 0.602 3773.64
6768.18 50.630 335.900 5072.45 5122.90 3508.83 N 1576.96 W 5969653.69 N 706407.46 E 0.893 3846.60
6862.56 51.270 338.080 5131.92 5182.37 3576.29 N 1605.60 W 5969720.33 N 706376.96 E 1.918 3919.85
6956.61 55.030 340.090 5188.31 5238.76 3646.59 N 1632.43 W 5969789.85 N 706348.19 E 4.348 3994.90
7051.98 54.960 341.430 5243.02 5293.47 3720.34 N 1658.17 W 5969862.86 N 706320.41 E 1.153 4072.64
7146.06 54.430 340.820 5297.40 5347.85 3792.99 N 1683.00 W 5969934.80 N 706293.58 E 0.773 4148.99
7241.58 53.460 340.220 5353.61 5404.06 3865.79 N 1708.75 W 5970006.86 N 706265.82 E 1.135 4225.86
1 October, 2002 - 16:20 Page 3 of6 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Lisburne PSI (East Dock) - PSI-10 MWD
Your Ref: API 500292311000
Job No. AKMW22135, Surveyed: 8 August, 2002
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth I net. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (a/100ft)
7335.43 53.600 339.430 5409.40 5459.85 3936.63 N 1734.78 W 5970076.95 N 706237.84 E 0.693 4301.07
7431.04 53.000 338.550 5466.54 5516.99 4008.19 N 1762.26 W 5970147.72 N 706208.38 E 0.969 4377.55
7523.38 54.980 335.590 5520.83 5571.28 4076.96 N 1791.38 W 5970215.65 N 706177.37 E 3.364 4452.18
7617.72 54.830 334.690 5575.07 5625.52 4146.99 N 1823.83 W 5970284.76 N 706142.99 E 0.797 4529.37
7712.08 54.300 335.060 5629.78 5680.23 4216.60 N 1856.47 W 5970353.44 N 706108.43 E 0.646 4606.25
~'~
7805.15 53.360 335.490 5684.71 5735.16 4284.84 N 1887.90 W 5970420.79 N 706075.13 E 1.077 4681.38
7899.17 53.360 335.530 5740.82 5791.27 4353.50 N 1919.17 W 5970488.55 N 706041.96 E 0.034 4756.82
7993.48 53.380 336.790 5797.09 5847.54 4422.72 N 1949.76 W 5970556.90 N 706009.47 E 1.072 4832.49
8085.92 52.980 338.310 5852.49 5902.94 4491.11 N 1978.02 W 5970624.48 N 705979.33 E 1.386 4906.42
8180.05 53.230 337.200 5909.00 5959.45 4560.78 N 2006.52 W 5970693.33 N 705948.91 E 0.980 4981.61
8272.99 53.650 336.460 5964.37 6014.82 4629.41 N 2035.90 W 5970761.12 N 705917.64 E 0.783 5056.23
8366.75 53.840 337.190 6019.81 6070.26 4698.92 N 2065.65 W 5970829.78 N 705885.97 E 0.660 5131.80
8460.50 53.590 337.050 6075.29 6125.74 4768.54 N 2095.03 W 5970898.56 N 705854.68 E 0.293 5207.32
8552.77 53.830 337.190 6129.91 6180.36 4837.06 N 2123.95 W 5970966.25 N 705823.87 E 0.287 5281.65
8648.60 54.180 335.250 6186.23 6236.68 4908.01 N 2155.21 W 5971036.30 N 705790.65 E 1.678 5359.16
8742.49 55.010 335.780 6240.63 6291.08 4977.65 N 2186.93 W 5971105.04 N 705757.02 E 0.997 5435.68
8834.80 54.720 334.460 6293.75 6344.20 5046.13 N 2218.68 W 5971172.62 N 705723.38 E 1.211 5511.17
8929.18 54.560 334.250 6348.37 6398.82 5115.52 N 2252.00 W 5971241.06 N 705688.16 E 0.248 5588.13
9022.68 54.950 333.370 6402.33 6452.78 5184.04 N 2285.70 W 5971308.62 N 705652.57 E 0.875 5664.48
9117.89 54.730 333.790 6457.16 6507.61 5253.75 N 2320.33 W 5971377.34 N 705616.02 E 0.428 5742.29
9212.69 54.300 334.220 6512.19 6562.64 5323.13 N 2354.17 W 5971445.76 N 705580.27 E 0.585 5819.47
9305.56 54.090 333.670 6566.52 6616.97 5390.80 N 2387.25 W 5971512.48 N 705545.33 E 0.531 5894.77
9399.52 53.810 333.300 6621.81 6672.26 5458.77 N 2421.16 W 5971579.49 N 705509.55 E 0.436 5970.71 --,/
9492.87 54.050 332.360 6676.78 6727.23 5525.90 N 2455.62 W 5971645.64 N 705473.24 E 0.854 6046.10
9579.27 54.130 333.070 6727.45 6777.90 5588.09 N 2487.69 W 5971706.92 N 705439.45 E 0.672 6116.02
9678.88 53.900 332.980 6785.98 6836.43 5659.92 N 2524.26 W 5971777.71 N 705400.92 E 0.242 6196.57
9772.34 52.350 332.390 6842.06 6892.51 5726.35 N 2558.56 W 5971843.16 N 705364.79 E 1.734 6271.26
9864.77 50.180 331.650 6899.89 6950.34 5790.02 N 2592.38 W 5971905.87 N 705329.22 E 2.429 6343.26
9958.88 48.850 332.110 6960.99 7011.44 5853.15 N 2626.11 W 5971968.03 N 705293.74 E 1.461 6414.72
10052.61 46.140 331.590 7024.32 7074.77 5914.07 N 2658.70 W 5972028.03 N 705259.48 E 2.920 6483.70
10146.74 43.340 331.630 7091.17 7141.62 5972.35 N 2690.21 W 5972085.42 N 705226.37 E 2.975 6549.83
10241 .27 42.840 331.520 7160.20 7210.65 6029.14 N 2720.94 W 5972141.34 N 705194.07 E 0.535 6614.29
10334.59 40.940 331.970 7229.67 7280.12 6084.03 N 2750.44 W 5972195.38 N 705163.06 E 2.061 6676.49
10428.25 38.420 332.4 70 7301.75 7352.20 6136.93 N 2778.32 W 5972247.49 N 705133.73 E 2.712 6736.21
10523.55 36.170 332.450 7377.56 7428.01 6188.12 N 2805.02 W 5972297.93 N 705105.63 E 2.361 6793.89
1 October, 2002 - 16:20 Page 4 of6 DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Lisburne PSI (East Dock) -I'SI-10 MWD
Your Ref: API 500292311000
Job No. AKMW22135, Surveyed: 8 August, 2002
BPXA
North Slope Alaska
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
10617.73 34.650 334.300 7454.32 7504.77 6236.89 N 2829.48 W 5972346.00 N 705079.82 E 1.975 6848.43
10711.86 34.220 333.910 7531.95 7582.40 6284.78 N 2852.73 W 5972393.22 N 705055.26 E 0.513 6901.65
10806.07 32.460 334.190 7610.65 7661.10 6331.33 N 2875.39 W 5972439.13 N 705031.32 E 1.875 6953.42
10900.34 28.700 332.960 7691.80 7742.25 6374.28 N 2896.70 W 5972481.47 N 705008.82 E 4.043 7001.35
10992.91 25.430 334.180 7774.22 7824.67 6411.98 N 2915.47 W 5972518.64 N 704989.02 E 3.583 7043.45
11088.51 23.440 334.480 7861.25 7911.70 6447.62 N 2932.60 W 5972553.79 N 704970.90 E 2.086 7082.99 ~,r
11182.76 21.660 333.680 7948.29 7998.74 6480.13 N 2948.39 W 5972585.85 N 704954.22 E 1.916 7119.12
11278.36 19.760 334.200 8037.71 8088.16 6510.50 N 2963.25 W 5972615.79 N 704938.52 E 1.997 7152.92
11366.07 18.740 333.820 8120.52 8170.97 6536.49 N 2975.92 W 5972641.42 N 704925.14 E 1.172 7181.83
11460.01 17.570 336.330 8209.78 8260.23 6563.02, N 2988.27 W 5972667.60 N 704912.06 E 1.498 7211.10
11551.30 17 .000 336.340 8296.95 8347.40 6587.86 N 2999.16 W 5972692.13 N 704900.49 E 0.624 7238.22
11645.55 16.620 336.920 8387.17 8437.62 6612.88 N 3009.97 W 5972716.84 N 704888.99 E 0.441 7265.46
11721.15 16.270 337.220 8459.68 8510.13 6632.59 N 3018.31 W 5972736.32 N 704880.10 E 0.476 7286.85
11809.00 16.270 337.220 8544.01 8594.46 6655.29 N 3027.84 W 5972758.74 N 704869.95 E 0.000 7311.45 Projected Survey
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to PSI slot J. Northings and Eastings are relative to PSI slot J.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from PSI slot J and calculated along an Azimuth of 335.080° (True).
Magnetic Declination at Surface is 26.354°(08-Aug-02)
r-
Based upon Minimum Curvature type calculations, at a Measured Depth Of 11809.00ft.,
The Bottom Hole Displacement is 7311.68f1., in the Direction of 335.537° (True). .
~
1 October, 2002 - 16:20
Page 50f6
DrillQuest 3.03.02.002
Sperry-Sun Drilling Services
Survey Report for Lisburne PSI (East Dock) - PSI-10 MWD
Your Ref: API 500292311000
Job No. AKMW22135, Surveyed: 8 August, 2002
BPXA
North Slope Alaska
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastlngs
(ft) (ft) (ft)
Comment
11809.00
8594.46
6655.29 N
3027.84 W
Projected Survey
~
Survey tool prOgram for PSI-10 MWD
From
Measured Vertical
Depth Depth
(ft) (ft)
. To
Measured Vertical
Depth Depth
(ft) (ft)
Survey Tool Description
0.00
908.00
0.00 908.00
905.46 11809.00
905.46 Tolerable Gyro(PSI-10 Gyro)
8594.46 MWD Magnetic(PSI-10 MWD)
,---
~
1 October, 2002 - 16:20
Page 60f6
DrillQuest 3.03.02.002
)
)
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Mike Bill
Commissioner
f"'.1If1
DATE: November 2, 2002
SUBJECT: Mechanical Integrity Tests
THRU: Tom Maunder BPXA
Petroleum Engineed G9YY\ P.S. I Pad
(j,Y \\\",07 PSI-01, 08, 09, 10
FROM: Jeff Jones Prudhoe Bay Unit
Petroleum Inspector Prudhoe Bay Field
NON- CONFIDENTIAL
Packer Depth Pretest Initial 15 Min. 30 Min.
TV.D. 8040 Tubing 900 900 900 900 Interval
Test psi 2010 Casing 150 2090 2090 2085 P/F
OA 200 450 450 450
Notes: Pre-test pressures monitored 15 min. & stable. Test fluid 60/40 methanol. S riser temp: 70 deg. F
Well PSI-01 Type Inj. S
P.T.D. 202145~ Type test P
Well PSI-08 Type Inj. S TV.D. 8014 Tubing 1175 1340 1340 1350 Interval
P.T.D. 202172~Typetest P Test psi 2004 Casing 80 2110 2090 2110 P/F
OA 220 420 420 420
Notes: Pre-test pressures monitored 15 min. & stable. Test fluid 60/40 methanol. S riser temp: 72 deg. F
Well PSI-09 Type Inj. S TV.D. 8034 Tubing 1160 1000 1160 1150 Interval
P.T.D. 2021240/Type test P Test psi 2009 Casing 380 2060 2060 2065 P/F
v ~ ~ ~ ~ ~
Notes: Pre-test pressures monitored 15 min. & stable. Test fluid 60/40 methanol. S riser temp: 76 deg. F
Pretest Initial 15 Min. 30 Min. 45 Min.
Well PSI-10 Type Inj. S TV.D. 8056 Tubing 850 850 850 850 850 Interval
P.T.D. 2021590 /Type test P Test psi 2014 Casing 0 2090 2085 2080 2080 P/F
~ OA 320 580 580 580 580
Notes: Pre-test pressures monitored 15 min. & stable. Test fluid 60/40 methanol. S riser temp: 74 deg. F
Type INJ. Fluid Codes Type Test Interval
F = FRESH WATER INJ. M= Annulus Monitoring 1= Initial Test
G = GAS INJ. p= Standard Pressure Test 4= Four Year Cycle
S = SALT WATER INJ. R= Internal Radioactive Tracer Survey V= Required by Variance
N = NOT INJECTING A= Temperature Anomaly Survey W= Test during Workover
D= Differential Temperature Test
0= Other (describe in notes)
Test's Details
November 2, 2002: I traveled to BPXA's PSI Pad in the Prudhoe Bay Field to witness initial MIT's on water injection wells
PSI-OI, PSI-08, PSI-09 and PSI-tO.
Roland Johnson was the BPXA representative today and he performed the tests in a safe and proficient manner. The pre-test
pressures were observed for 15 minutes and found to be stable. The standard annulus pressure test was then performed, with
all four wells passing the MIT. Well PSI-I0 was monitored an additional 15 minutes to further demonstrate integrity and the
casing pressure stabilized at 2080 PSI. The four well houses were inspected with no exceptions noted.
Summary: I witnessed successful MIT's on BPXA's Prudhoe Bay Field water injection wells PSI-OI, PSI-08, PSI-09 and
PSI-IO. Four well house inspections; no exceptions noted.
.1.T.'s performed: ~
Attachments:
Number of Failures: Q
Total Time during tests: 5 hrs.
cc:
MIT report form
5/12/00 L.G.
MIT PBU PSI 01,08,09,10 11-2-02 JJ.xls
I
~
I
~
I
~
I
~
11/4/2002
Schlumbepger
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
A TTN: Beth
~
Well
PSI-10 dr\~- f)q
D.S. 1-22A J qq".. J h5
D.S.11-17A~~_~~
~
Job#
TEMP & PRESS LOG
PRODUCTION PROFILE
PRODUCTION PROFILE
Log Description
Date
10/14/02
10/07/02
10/01/02
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alaska) Inc. ECe\VED
Petrotectnical Data Center LR2-1 R . .
900 E. Benson Blvd.
Anchorage, Alaska 99508 NOV 0 1 2002
Date Delivered: ~~ Q~ & ~~. ConS. CommisSiOn
Anchorage
Blueline
10/24/02
NO. 2513
Company:
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Sepia
Color
Prints
CD
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
A TIN: Beth
Reœlved~Wkp:)
SchtDm_epgBP
Alaska Data & Consulting Services
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Beth
Well
PSI-10 ~ð~-J5q
D.S.14-12 I ~J--I °'1
BP Exploration (Alaska) Inc.
Petrotectnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
Job#
Log Description
Date
22422 USIT
22382 RST -SIGMA
08/27/02
07/08/02
RECEIVED
OCT 0 1 200?
AIa8ka Oil & Gal eons. CommIuUn
AncINnge
Blueline
NO. 2418
Company:
09/16/02
State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay
Sepia
Color
Prints
2
Schlumberger GeoQuest
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
A TIN: Beth
Receive~: ~
CD
L OOdf-'.J
)
J
Œ
TONY KNOWLES, GOVERNOR
AIfASIiA. OIL AND GAS
CONSERVATION COMMISSION
Brian Robertson
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
PO Box 196612
Anchorage AK 99519
333 W. -¡TH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276.7542
Re:
Prudhoe Bay Unit PSI -10
BP Exploration (Alaska), Inc.
Pennit No: 202-159
Surface Location: 1394' SNL, 957' EWL, Sec. 15, TIIN, RI5E, UM
Bottomhole Location: 5263' SNL, 3232' EWL, Sec. 04, TllN, RI5E, UM
Dear Mr. Robertson:
Enclosed is the approved application forpennit to drill the above referenced service well.
The pennit to drill does not exempt you from obtaining additional pennits or approvals required by law
from other governmental agencies, and does not authorize conducting drilling operations until all other
required pennits and approvals have been issued. In addition, the Commission reserves the right to
withdraw the pennit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an
applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a
Commission order, or the tenns and conditions of this pennit may result in the revocation or suspension
of the pennit.
The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035; and the
mechanical integrity (MI) of the injection wells must be demonstrated under 20 AAC 25.412 and 20 AAC
25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test before operation, and of the
BOPE test perfonned before drilling below the surface casing shoe, must be given so that a representative
of the Commission may witness the tests. Notice may be given by contacting the Commission petroleum
field inspector on the North Slope pager at 659-3607.
Sincerely,
(~/~'Jf
Cammy ~echsli Taylor
Chair
BY ORDER 2" THE COMMISSION
DATED this11h. day of August, 2002
cc:
Department ofFish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
Hole
42"
16"
12-1/4"
8-1/2"
'\ STATE OF ALASKA ,
ALASKA~_.l AND GAS CONSERVATION COMM~,-.AION
PERMIT TO DRILL
20 AAC 25.005
1 b. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil
181 Service [] Development Gas [] Single Zone [] Multiple Zone
5. Datum Elevation (DF or KB) 10. Field and Pool
Plan KBE = 51.41 Prudhoe Bay Field / Prudhoe
6. Property Designation Bay Pool
ADL 034631
7. Unit or Property Name
Prudhoe Bay Unit
8. Well Number
PSI-10
9. Approximate spud date
08/09/02 Amount $200,000.00
14. Number of acres in property 15. Proposed depth (MD and TVD)
2560 11852' MD / 8606' TVD
17. Anticipated pressure {see 20 MC 25.035 (e) (2)}
0
53 Maximum surf¡¡ce 3000 psig, At total depth (TVD) 8606' / 3848 psig
Setting Depth
T QO Bottom
MD TVD MD TVD
Surface Surface 73' 73'
Surface Surface 6052' 4647'
Surface Surface 11477' 8255'
97691 8120' 11852' 8606'
ItJbA- 1- ¡'~1:J~
~ <6/~/~
\.
1 a. Type of work 181 Drill [] Redrill
[] Re-Entry [] Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1394' SNL, 957' EWL, SEC. 15, T11 N, R15E, UM (As Planned)
At top of productive interval
88' SNL, 31911 EWL, SEC. 09, T11 N, R15E, UM
At total depth
5263' SNL, 3232' EWL, SEC. 04, T11 N, R15E, UM
12. Distance to nearest property line 13. Distance to nearest well
ADL 034632, 3232' MD PSI.09 is 32' away at 700' MD
16. To be completed for deviated wells
Kick Off Depth 300' MD Maximum Hole Angle
18. Casin~ Program Specifications
Size
Casina Weiaht Grade Couplina
34" x 20" 91.51# H-40 Weld
13-3/8" 68# L-80 BTC
9-5/8" 47# L-80 BTC-M
7" 26# L-80 BTC-M
11. Type Bond (See 20 AAC 25.025)
Number 2S 100302630-277
Lenath
80'
6052'
11477'
555'
Quantitv of Cement
(include staae data)
260 sx Arctic Set (Approx.)
1346 sx Articset III Lite, 599 sx 'G'
615 sx Class 'G'
116 sx Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
feet
feet
feet
feet
Junk (measured)
Plugs (measured)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
Size
Cemented
MD
TVD
N~~.
{2.f:lfUtS'1'" "1114"f"" v¡H:ttANtE=' ïÞ P"LE ).0 Me. )S. £ft2.. (I,) BE='
~'t€b. 1>9 tte-~~JÙ~AT""P1G p~ ßF' P'-Ac(7D uP
-ro '1.S"O' ~ '1\1ê"TO) I'~'~rr!f~.v ('IòÞ I "'''~)-
, . t. "'""' " ~,,- 1 ~~ ~/3"O7-.
JUL \31
Perforation depth: measured
AJaJ3ka &
.AnchoraQo
181 Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch 181 Drilling Program
181 Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Walter Quay, 564-4178 Prepared By Name/Number: Terrie Hubble, 564-4628
~.~~ D~
Permit Number API Number . Appro~al D~te See cover lett~r
;2..,0:;"-/$1 50- 0.2, 9 - 2- 311t) ~ \\\(J~ forotherreOUlrements
Conditions of Approval: Samples Required 0 Yes BI No Mud Log Required 0 Yes 181 No
Hydrogen Sulfide Measures 0 Yes mI No Directional Survey Required .œJ Yes 0 No
Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU
Other: M~T ~ CVfA.-t¡UA-l; bn (:J) ~/tAÂr>-t'J. T~~t- ~t'fE ~ 4000 (Xi:
it? ~c. tS. t..jiLG J w.JV~d, by order of /' [ \
Approved By Ongloa1 Signee y On ø. rC. f. ~mJ...S~O. .0.. rrr the commission Date >5.'L~' ';l
Form 10-401 Rev. 12cawuecns" layb 1\ IlJ . i\J 1-\ -- Suömit In Triplicate
true vertical
20. Attachments
.'
'ß
-)
I Well Name:
)
PSI-10 I
Drill and Complete Summary
I Type of Well (producer or injector):
I Injector - Water
Surface Location:
x = 708,081 / Y = 5,966,190
1394'FNL,957' FVVL, Sec. 15,T11N,R15E
X = 704,840 / Y = 5,972,690
88' FNL, 3191' FVVL, Sec. 9, T11N,R15E
X = 704,878 / Y = 5,972,795
5263' FNL, 3232' FVVL, Sec. 04,T11N, R15E
Target Location:
Bottom Hole Location:
I AFE Number: I PBD4P1924 I
I MD: 1 11,852' I
I TVD: I 8,606' 1
I Estimated Start Date: I 08/09/02 1
I Operating days to complete: I 24.3 1
I RiQ: I Nabors 27e I I KB: 134.5' I I Ground Elevation: 117.6' I 1 KB Elevation: 1 51.4 I
I
I
I Well Design (conventional, slim hole, etc.): I Big Bore
I Objective: I High rate water injection into Ivishak Gas Cap, Zones 3 through 1
Formation Markers (wp05)
Tops MD TVDss Comments
Base PF 1953 1902 8.6 ppg
SV4 4257 3566 8.6 ppg
SV3 4928 3970 8.6 ppg
SV2 5262 4171 8.6 ppg
SV1 5886 4547 8.6 ppg
UG4 6707 5042 8.6 ppg
UG3 7072 5262 8.6 ppg
UG 1 8242 5907 8.6 ppg
. VVest Sak 2 9035 6445 8.6 ppg
VVest Sak 1 9343 6631 8.6 ppg
CM3 9681 6834 8.6 ppg
CM2 na Na 8.6 ppg
CM1 na Na 8.6 ppg
THRZ 11,312 8100 8.6 ppg
BHRZ/LCU 11,512 8287 8.6 ppg
TZ4 NA Na 7.5 ppg; HC Bearing
TZ3 11512 8100 7.5 ppg; HC Bearing
TZ2 11 ,577 8348 7.5 ppg; HC Bearing
BSAO 11,618 8387 7.5 ppg; HC Bearing
TO 11,852 8606 7 ~5 ppg;
TLSB N/A 8.6 ppg; HC Bearing
Surface TD Criteria: Based on -100' TVO below SV1 Top.
Intermediate TD Criteria: Casing to be set above BHRzrrZ4 transition.
TD Criteria: Based on 50' TVO above TLSB.
Drilling Permitdoc
7/31/2002
Page 1 of 10
~)
)
I )
Grade Conn Length Top Btm
MD/TVD MD/TVD
H-40 Welded 80' GL -73' 173'
CasinQlTubinQ ProQram
Hole Size Csg/ WtlFt
Tbg O.D.
Insulated 20" 91.51 #
(34" 00)
16" 13-3/8" 68# L-80 BTC -6052' GL 6052' 14647'
12-1/4" 9-518" 47# L-80 BTC-M -11,477' GL 11,477'/8,255'
8-1/2" 7" 26# L -80 BTC-M -555' 9769' 1 8,120' 11 ,852' 1 8,606'
Tubing 7-5/8" 29.7# L-80 STL ...11,327' GL 11,327'/8115'
NOTE: This well is planned with the minimum allowed, 100' liner lap, the 9-5/8" shoe will be located near the.
bottom of the HRZ, but with the planned completion, the pac.ker to injection zone distance will more than likely be.
greater than the 200' as per 20 AAC 25.412 (b), but less. than 250'. Approval for 250' packer to injection zone is
requested.
42"
Directional
KOP: I 300' MO
Maximum Hole Angle:
Close Approach Well:
-530 In intermediate section from 3200' to 9760'
PSI-10 passes BP Close Approach guidelines. The nearest well is PSI-09 which
is -35 well-to-well at surface and 32' at 700'.
Survey Program: Standard MWO Surveys from surface to TO.
*Refer to the attached, approved Sperry directional program - wp05
Mud ProQram
16" Surface Hole I Freshwater Spud Mud
From Surface to -80' TVO below top SV1
Interval Density Viscosity
(ppg) (seconds)
Initial to Base PF 8.8 - 9.5 200-300
Base PF to Top SV sands 9.0 - 9.5 100-150
Top SV sand to Interval TO 9.5 max 75-150
*Refer to the attached Baroid mud program for details
12-1/4" Intermediate Hole I LSND
From Surface Casing Shoe to BHRZ
Interval Density Plastic Viscosity YP
(ppg) (cp) (Ib/100ft2)
Initial to THRZ 9.0-9.8 10-15 25-30
THRZ to BHRZ 10.3 10-15 20-30
*Refer to the attached Baroid mud program for details
8-1/2" Production Hole I BARADRILn
From Intermediate Casing Shoe to TO
Interval Density Plastic Viscosity YP
(ppg) (cp) (lb/100ft2)
Ivishak 8.8-9.0 10-15 17-25
*Refer to the attached Baroid mud program for details
Drillìng Pennit.doc
7/31/2002
YP tauo API FL pH
(Ib/100ff) (lb/100ft2) (mls/30min)
50-70 >8 15-20 8.5- 9.5
30-45 >6 4-10 8.5- 9.5
20-35 >6 4-10 8.5- 9.5
tauo
(lb/100ff)
4-7
4-7
10' Gel API HTHP FL
(mls/30min)
6-10
4-61<12.0
8.5-9.5
8.5-9.5
pH
LGS
% vol
<5
<5
10
10
tauo
(lb/100ff)
3-5
10' Gel API HTH P FL
(mls/30min)
4-6<12.0
8.5-9.5
pH
LGS
% vol
<5
10
Page 2 of 10
¡¡
)
)
Integrity Testing
The 13-3/8" surface casing point is expected to provide a fracture gradient of 12.5 to 13.5 ppg EMW. Fracture
gradient information from offset are shown below:
Well Name
East State Bay-1
L2-32
L3-01
L3-05
PSI-06
PSI-09
Formation
SV-4?
SV-4
SV-3
SV-3
SV-1
SV-1
TVDss
2745' TVDss
3589' TVDss
4009' TVDss
4032' TVDss
4564' TVD
4675' TVD
Frac Gradient, PPG
12.1 ppg EMW
12.5 ppg EMW
13.8 ppg EMW
12.5 ppg EMW
13.4 ppg EMW
12.1 ppg FIT
Kick tolerance volume will be continually updated as the well is in progress, incorporating the most up-to-date data
available from the well. Below are the planned integrity test points.
Test Point Depth
Surface Casing Shoe 20' minimum below shoe
Intermediate Casing Shoe 20' minimum below shoe
Well Evaluation ProQram
~
16" Surface:
Drilling:
Open Hole:
Cased Hole:
Coring:
Sampling:
12-1/4" Intermediate:
Drilling:
Open Hole:
Cased Hole:
Coring:
Sampling:
8-112" Production:
Drilling:
Open Hole:
Cased Hole:
Coring:
Sampling:
Drillìng Pennit.doc
MWD/GR
None
None
None
None
Test Type
FIT
FIT
EMW
12.0 ppg for -105 bbl kick tolerance
10.0 ppg
MWD 1 GR 1 Res - Realtime from 500' above BHRZ to section TD
None
USIT
None
Cuttings Samples - from 500' above BHRZ to section TD
MWD 1 GR 1 NEU 1 LWD **- Realtime over entire interval
BHC Sonic 1 GR
None
None
Cuttings Samples and Gas Detection - Entire Interval
7/3112002
Page 3 of 10
.
')
Cement Program
The following surface casing cement calculations are based upon a single stage job. As contingency, a port collar
will be run in the casing at -1000' MD to allow circulating cement to surface if the single stage is unsuccessful. In
the event that cement is not circulated to surface during the initial surface casing cement job, notify the AOGCC of
the upcoming remedial cement work for possible witness of cement to surface.
Casing Size 113-3/8" Surface I
Basis: Lead: Open hole volume + 400% excess in permafrost; 500/0 excess below permafrost.
Lead TOC: To Surface.
Tail: Open hole volume + 50% excess + 82' shoe track volume.
Tail TOC: 1000' MD above 13-3/8" shoe (-5050' MD)
Fluid Sequence & Volumes: Pre
Flush
Spacer
Lead
75 bbls MudPUSH Viscosified Spacer weighted to 10.2 ppg
1064 bbl I 5974 fe I 1346 sks of Dowell ArticSET III-Lite at 10.7
ppg and 4.44 dIsk, BHST 45° I BHCT 52°, TT = 6.0 hrs
124 bbl I 696 fe 1599 sks of Dowell Premium 'G' at 15.8 ppg and
1.16 dIsk, BHST 90° I BHCT 860, TT = 4 hrs
*See Attached Dowell Cement Program for Details
Casing Size I 9-5/8" Intermediate
Basis: Lead: None
Tail: Open hole volume + 50% excess + 82' shoe track volume
Tail TOC: 1500' above 9-5/8" shoe (-9,919 MD)
Fluid Sequence & Volumes: Pre 80 bbls Chemical wash at 8.3 ppg
Flush
Spacer
Lead
Tail
Tail
50 bbls MudPUSH Viscosified Spacer weighted to 12.0 ppg
None
131 bbl I 738 fe /615 sks of Dowell Premium Latex 'G' at 15.8
ppg and 1.20 dIsk, BHST 1700 I BHCT 1310, TT = Batch Mix +
4.0 hrs
*See Attached Dowell Cement Program for Details
Liner Size I 7" Production
Basis: Lead: None
Tail: Open hole volume + 50% Excess + 82' shoe track + 150' liner lap + 200' of 9-5/8" x 5" DP
annulus volume.
Tail TOC: -11,377' MD (-' TVD).- Liner top.
Fluid Sequence & Volumes: Pre 30 bbls CW100 at 8.3 ppg
Flush
Spacer
Lead
Tail
30 bbls MudPUSH Viscosified Spacer weighted to 11.0 ppg
None
25 bbl I 139 fe I 116 sks of Dowell Premium Latex 'G' at 15.8
ppg and 1.20 dIsk, BHST 1810 I BHCT 1370, TT = Batch Mix +
3.5 hrs
*See Attached Dowell Cement Program for Details
Drilling Pennit.doc
7/3112002
Page 4 of 10
..
)
Well Control
Well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular
preventer will be installed and is capable of handling maximum potential surface pressures.
Diverter, BOPE and drilling fluid system schematics on file with the AOGCC.
Surface Interval-
BOPE
Maximum anticipated BHP
Maximum surface pressure
Kic k tolerance
Planned BOP test pressure
13-3/8" Casing Test pressure
Intermediate Interval-
BOPE
Maximum anticipated BHP
Maximum surface pressure
Kick tolerance
Planned BOP test pressure
9-5/8" Casing Test pressure
Production Interval-
BOPE
Maximum anticipated BHP
Maximum surface pressure
Kick tolerance
Planned BOP test pressure
9-5/8" Casingn" Liner Test
Planned completion fluids
20", 2M Diverter (Hydril - MSP)
2078 psi (8.6 ppg @ 4647' TVD)
1614 psi
N/A
Function test
3500 psi surface pressure
13-3/8", 5M, 3 Gates with Annular (Hydril - GL)
3691 psi (8.6 ppg@ 8254' TVD)
2866 psi (.10 psi/ft gas gradient to surface)
105 bbls 4CtXÞ ~Gk"
Rams test to 3.,66O'"psi/250 psi.
Annular test to 2,500 psi/250 psi
3500 psi surface pressure
13-3/8", 5M, 3 Gates with Annular (Hydril - GL)
3848 psi (8.6 ppg @ 8606' TVD)
3000 psi (.10 psi/ft gas gradient to surface)
Infinite
Rams test to 4,000psi/250 psi.
Annular test to 2,500 psi/250 psi
4000 psi surface pressure
8.4 ppg Seawater / 6.8 ppg Diesel
Disposal
. No annular injection in this well.
. Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-
04. Any metal cuttings will be sent to the North Slope Borough.
. Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection.
Haul all Class I wastes to Pad 3 for disposal.
Drilling Pennit.doc
7/31/2002
Page 5 of 10
) )
Drill and Complete Procedure Summary
Pre-Ritl Work:
1. The 20" insulated conductor should be installed.
2. The FMC landing ring for the FMC Big Bore wellhead on the 20" conductor and the two 4" side outlet valves on
the conductor pipe for surface cementing operations are in place.
Ritl Operations:
1. Move Nabors 27e from PSI-01 to PSI-10 /
2. Nipple up and function test diverter system. PU 5" DP to drill surface hole and stand back in derrick.
3. MU 16" drilling assembly with MWD/GR and directionally drill surface hole to approximately 6052' MD / 4647'
TVD. The actual surface hole;o will be +/-100' TVD below the top of the SV1 sands.
4. Run and cement the 13-3/8", 68# surface casing back to surface. A port collar will be run in the casing to
allow for secondary cementing if cement is not circulated to surface during primary cementing operations.
5. ND diverter system and NU casingl tubing head. NU BOPE and test to 4000 psi. ~~
6. MU 12-1/4" drilling assembly with MWD/GR/Res and RIH to float collar. Test the 13-3/8" casing to 3500 psi
for 30 minutes.
7. Drill out shoe joints and displace well to 9.0 ppg LSND drilling fluid. Drill new formation to 20' below 13-3/8"
shoe and perform Leak Off Test.
8. Drill ahead as per directional plan and mud program.
9. Increase mud weight to 10.3 ppg prior to the HRZ. Short trip as required.
10. TD the 12-1/4" interval in the BHRZ. Get as close to the BHRZfTZ3 as possible without penetrating TZ3.
11. Run and cement the 9-5/8", 47# intermediate casing. -Displace cement with 10.0 ppg mud. Freeze protect the
13-3/8" X 9-5/8" annulus to 2200' MD.
~
12. OPTION: If cement job went poorly or is suspect, RU E-line. RIH with USIT. Log bottom 1500' MD of
wellbore. Determine bond quality and TOC. POH. Otherwise continue with program.
13. MU 8-1/2" drilling assembly with MWD/GR/NUE/LWD and RIH to float collar. Test the 9-5/8" casing to 3500
psi for 30 minutes.
14. Drill out shoe joints and 20' of new formation. Formation Integrity Test will be the 10.0 ppg MW in the hole.
Displace hole over to 9.0 ppg BARADRILn fluid.
15. Drill ahead as per directional plan to proposed TD at 11,851' MD / 8606' TVD. The actual TD of the well will
extend +/-60' TVD below the BSAD, but no deeper than 50' TVD above the TLSB. Short trip as required and
condition hole for running the 7" liner. /~
16. RU E-Line. Run USIT to log bottom 1500' of 9-5/8" casing and the BHC sonic.
17. Make open hole clean-out if necessarY.
18. Run and cement the 7", 26# liner:'The liner will extend up into the 9-5/8" casing -100' MD (MIN) and will be
fully cemented to the liner top. Displace cement with mud. POOH with drillpipe.
19. RIH with 6-1/8" bit, a scraper for the 7",26# liner, and a scraper for 9-5/8",47# casing. Clean out to PBTD.
Displace hole over to seawater.
20. Test wellbore to 4000 psi for 30 minutes. POH laying down drill pipe as necessary.
21. Run 7-5/8", IPC, Flush-joint, injection string with tailpipe. /'
22. Locate above 7" tie back sleeve. Set packer.
23. Shear out of PBR. PU and space out. Make up tubing hanger.
24. Circulate Freeze protection. Allow diesel to U-Tube in annulus. Land Tubing hanger/sting back into PBR.
25. Pressure test tubing and annulus to 4000 psi for 30 mins.
26. Set BPV. ND BOPE. NU tree.
27. Test tree to 5000 psi, Secure well. RDMO.
Post-Ritl Work:
1. Clean-up location as required.
2. R/U wireline. Recover ball and rod.
3. Perforate and stimulate Ivishak intervals as required.
4. Put on Injection.
Drilling Permit.doc
7/31/2002
Page 6 of 10
)
Job 1: MIRU
Hazards and Contingencies
~ The rig move will involve a moving in -35' from PSI-09. PSI-09 is scheduled to for perforating before the
rig arrives. Establish a minimum distance of 5' from PSI-09 well. Discuss the move at a pre-job safety
meeting and designate a spotter to ensure there is not danger of a collision. If ti appears the 5' distance
will be crossed, the move should be stopped, the rig backed up, and the move on reattempted.
(~..N_>~'~X:«<'M. ',' . ~
Job 2: Drill Surface Hole
Hazards and Contingencies
~ No fault crossing are expected in the surface interval.
~ There are no close approach issues along the PSI-10 well path.
and 32' at 700'.
~ Abnormally pressured shallow gas zones have NOT been observed in offset wells and is not expected at
PSI-10.
The nearest well is PSI-09 at 35' surface
~ Hole cleaning will be challenging in the 16" hole with 5" DP. Maintain adequate viscosity and high flow
rates. Short trip as required.
Job 3: Install 13-3/8" Surface CasinQ
Hazards and Contingencies
~ It is critical that cement is circulated to surface for well integrity. 400% excess cement through the
permafrost zone (and 50% excess below the permafrost) is planned. As contingency, a port collar will be
run in the casing at -1000' MD to allow circulating cement to surface if the single stage is unsuccessful.
~ Cementing practices on the surface casing should meet the below criteria.
1. Pipe reciprocation during cement displacement
2. Cement - Top of lead to surface
3. Cement - Top of tail >1000' MD above shoe using 50% excess.
4. Casing Shoe Set approximately -1 OO'TVD below SV -1 sand top.
Job 4: Drill Intermediate/Production Hole
Hazards and ConUngencœs
~ Fault crossings are not expected along the PSI-1 0 wellpath in the intermediate hole.
~ Lost circulation is not expected in the intermediate hole section. Consult the Lost Circulation Decision
Tree regarding LCM treatments and procedures if LC is encountered.
~ Increase the MW to 9.8 ppg before the WS3 @ -9300' MD/6300'TVD. Significant gas have been
encountered in small stringers in the CM sequences in PSI-06 & PSI-09, requiring MW in the upper 9's
and lower 10's to suppress.
~ The directional plan has been built to minimize directional work and tangent angle in the HRZ. With the
current directional plan, ensure the MW is at least 10.0 ppg before entering the HRZ to aid in hole stability.
~ Differential sticking will be a problem if the drill string is left stationary for an extended period of time
across the long permeable sections of the Ugnu and West Sak intervals. Minimize the time the pipe is left
stationary.
~ The kick tolerance for the 12-1/4" open hole section would be 105 bbls assuming a kick while at the
section TD (-11,477' MD 1 8,254' TVD). This is a worst case scenario based on a 10.0 ppg pore pressure
gradient, a fracture gradient of 12.0 ppg at the 13-3/8" shoe, gauge hole, and 10.0 ppg mud in the hole.
~ Picking the 9-518" casing point is critical. Every attempt should be made to hit just above the HRZ/Zone 3
transition. The planned TD pick is in the lower HRZ. If Zone 3 is drilled, LC could be encountered due to
the low pore pressure in Zone 3 (7.5 ppg). Control drilling (constant parameters) will be required.
» Drilling Close Approach: All wells pass BP Close Approach guidelines.
Drillìng Permit.doc
7/31/2002
Page 7 of 10
j
~)
.Job 6: Install 9-5/8" Intermediate/Production CasinQ
Hazards and Contingencies
» Differential sticking is a concern across the Ugnu and West Sak sand intervals. Communicate individual
responsibilities to all members of rig team and review connection / tripping practices to minimize the time
the pipe is left stationary.
» Verify the floats are holding prior to continuing cementing operations. If floats are not holding, hold
pressu re and wait on cement.
» Make every attempt to minimize the amount of HRl left open below the 9-5/8" shoe. The HRZ could
present problems while drilling the Ivishak with a 9.0 ppg mud or during subsequent liner running
operations.
Job 7: Drill 8-1/2" Production Hole
Hazards and Contingencies
» Fault crossings are not expected along the PSI-10 wellpath in the production hole.
» Lost circulation is considered to be a moderate risk because of the low pore pressure in the Ivishak.
Consult the Lost Circulation Decision Tree regarding LCM treatments and procedures.
» KICK TOLERANCE: The kick tolerance for the 8-1/2" open hole section would be an infinite influx
assuming a kick from the Ivishak. This is a worst case scenario based on a 8.6 ppg pore pressure
gradient, a fracture gradient of 10.0 ppg at the 9-5/8" shoe, and 9.0 ppg mud in the hole.
)õ> Drilling Close Approach: All offset wells pass BP Close Approach guidelines.
» Gas Cap Drilling: High potential for swabbed gas kicks.
» Hole Instability due to exposed HRZ: Recommended practices for drilling the HRl in this area at 20°
hold angle, call for a 10.0 ppg minimum mud weight. Due to the low reservoir pressure of the Ivishak, this
section will be drilled with 9.0 ppg mud. Therefore, the potential exsists for any exposed HRl to start
causing hole problems.
~.'."$-:~::~.>i«"*,'.'Øm'.1f.:"«
Job 9: Install 7" Production Liner
Hazards and Contingencies
» Differential sticking could be a problem. Minimize the time the pipe is left stationary while running the liner.
» Hole instability, ledges across open HRl interval.
» Ensure the liner top packer is set prior to POOH. This may require going through the setting process
twice. Slack off with rotation to the maximum allowable down weight, as per Baker representative.
)«~"':~.^.^.....~"";""~~~~~~~~l'i~~~II~_I,!(.",M~
Job 12: Run Completion
Hazards and Contingencies
» Diesel will be used to freeze protect the well. The diesel flash point is 1 00° F. Diesel vapor pressure is -
0.1 psia at 100° F.
» The injection tubing is large diameter, internally coated, and has flush joint connections. This job will be
non-routine. Ensure all personnel are briefed of the potential hazards. Review all aspects of the
operation with all rig team members prior to starting the job.
» Ensure personnel are clear of rig floor during packer setting and when shearing out of the PBR. There will
be the potential for a sudden release of stored energy with the string to jump at surface.
» Freeze protection operations will also be non-routine without a RP Shear valve in the injection string.
Freeze protection will be done through the BOP stack and choke manifold. Take extra precaution to avoid
spills. Ensure all lines are blown down to vac truck.
» Ensure MSDS sheets are available for completion fluid additives.
-~t.."","...;o......_-.
Drilling Pennit.doc
7/31/2002
Page 8 of 10
\,
)
Job 13: ND/NU/Release RiQ
Hazards and Contingencies
~ See Job 1 for adjacent well spacing. Identify hazards in a pre move meeting, and take every precaution to
ensure good communication prior to beginning the rig move. Use spotters when moving the rig.
~ Non-routine freeze protect operations may leave diesel in BOPE, choke manifold, and associated lines.
Take extra precaution to avoid spills. Ensure all lines are blown down to vac truck.
Drillìng Permit doc
7/31/2002
Page 9 of 10
)
PSI-10
Summary of Drilling Hazards
POST THIS NOTICE IN THE DOGHOUSE
Surface Hole Section:
.
Gas hydrates are not expected in this area.
Gravel beds below the Permafrost may be present.
.
Intermediate Hole Section:
.
Fault crossings are not expected along the PSI-10 wellpath in the intermediate hole.
Lost circulation is not expected in the intermediate hole section. Consult the Lost Circulation Decision
Tree regarding LCM treatments and procedures if LC is encountered.
The directional plan has been built to minimize directional work and tangent angle in the HRZ. With the
current directional plan, raise MW to 10.0 ppg before entering the HRZ to aid in hole stability.
Differential sticking will be a problem if the drill string is left stationary for an extended period of time
across the long permeable sections of the Ugnu and West Sak intervals. Minimize the time the pipe is left
stationary.
The kick tolerance for the 12-1/4" open hole section would be 105 bbls assuming a kick while at the
section TD (-11,477' MD /8,254' TVD). This is a worst case scenario based on a10.0 ppg pore pressure
gradient, a fracture gradient of 12.0 ppg at the 13-3/8" shoe, gauge hole, and 10.0 ppg mud in the hole.
Picking the 9-5/8" casing point is critical. Every attempt should be made to hit just above the HRZ/Zone 3
transition. If Zone 3 is drilled, LC could be encountered due to the low pore pressure in Zone 3 (7.5 ppg).
.
.
.
.
.
Production Hole Section:
.
Gas cap drilling: High potential for swabbed gas kicks.
Lost circulation is considered to be a moderate risk because of the low pore pressure in the Ivishak.
Consult the Lost Circulation Decision Tree regarding LCM treatments and procedures.
Exposed HRZ has the potential for tight hole and sloughing. Monitor cuttings for excessive shale returns.
The kick tolerance for the 8-1/2" open hole section would be an infinite influx assuming a kick from the
Ivishak. This is a worst case scenario based on a 8.6 ppg pore pressure gradient, a fracture gradient of
10.0 ppg at the 9-5/8" shoe, and 9.0 ppg mud in the hole.
.
.
.
CONSULT THE PSI PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION
Drilling Pennit.doc
7/31/2002
Page 10 of 10
fr)10 Completion Desia )
100,000 bblslday @ 2700 psi injection pressure
XOver #1- Tbg Hanger:
7" NSCC Box X 7-5/8" STL Pin
20" x 34" Insulated
Conductor @ +1- 80'
7" x 9-5/8" Baker HMC Liner Hanger,
ZXP Liner Top packer, and tieback sleeve
9-5/8", 47#, L-80, BTC-M Intermediate
Casing @+I- 8254' TVD; 11,471' MD
Tree: 6-3/8" bore x 7-1/6"
5K, 625 Inlay, CIW
H
Wellhead: 13-5/8", 5K, Big Bore
FMC
7" Camco 6.00" DB Nipple
with Injection Valve at -2200'
7-5/8",29.7#, ST-L, IPC,
Injection Tubing
(wIT' accessories)
7" x 5.963" HES R Nipple
7" x 9-5/8" Baker Seal Assy
7" x 9-5/8" SABL-3 packer
with 20' PBR
7" x 5.963" HES R Nipple
7" x 5.77" HES RN Nipple
7" WLEG
:=i
I
Note: All tailpipe and
accessories to be TCII
13-3/8" TAM Port Collar
@ +1- 1000' MD
XOver #2&3-lnjection Valve:
7-5/8" STL Box X 7" TCII Pin
7" TCII Box X 7-5/8" STL Pin
13-3/8", 68#, L-80, BTC Surface
Casing @ +1- 4547' TVD; 6052' MD
XOver #4-Seal Assembly:
7 -5/8" STL Box X 7" TCII Pin
7", 26#, L-80, BTC-M Injection Liner
@ +1- 8606' TVD: 11,852' MD
Date
Comments
Rev By
woa
woa
PSI-10 WP4
Packer to Injection Zone to be Less than 250'
Liner Lap to be greater than 100'
07 -03-02
07/30/02
PROJECT: GCWI
WELL: PSI-10
API NO:
GPB Rotary Drilling
Sf:3SJ'""8r"\J-5Uf1 North Slope A.-Àka
çrRTccTÑG~!ì!i~~~~~~ BPXA
~
6300
5400 -
4500 -
S'
+-'
.Q
CJ)
ëñ 3600 -
~
CJ)
0>
C
:.c
+-'
10-
0
Z
2700 -
1800 -
900 -
+-'
Õ
0
0>
II
.c
t)
.S
Q)
-æ
t)
(f)
DrillQuest 2.00.09.006
~~I~f~~~ò5)East Dock) DrillQuesl
7" Liner
11851.71ft MD
8606.4011 rVD
CH:k:;
Total Depth: 11851.71ftMD,8606.4OftTVD
fi6ü$AOft ¡VO 6$93.99 N. 3.109.93 W
8232.40 TVD. 65fiJ.41 N, 3059-46 W
End Dir, Start Sail @ 20.000° : 11406.91ftMD,8188.43ftTVD
Begin Dir @ 2.0ooo/100ft: 9759.86ft MD, 6882.1 Oft TVD
Begin 12-1/4" Hole
Proposal Data for PSI-10 WP05
Vertical Origin:
Horizontal Origin:
Measurement Units:
North Reference:
PSI slot J
PSI slot J
ft
True North
Dogleg severity: Degrees per 100 feet (US)
Vertical Section Azimuth: 335.080°
Vertical Section DescriptionPSI slot J
Vertical Section Origin: 0.00 N,O.OO E
Measured Incl. Azim. Vertical Northings Eastings Vertical Dogleg
Depth Depth Section Rate
0.00 0.000 0.000 0.00 O.ooN O.OOE 0.00
34.00 0.000 0.000 34.00 O.OON O.OOE 0.00 0.000
300.00 0.000 0.000 300.00 O.ooN O.OOE 0.00 0.000
1864.80 23.472 340.000 1821.40 297.00 N 108.10 W 3]4.90 1.500
2191.87 23.4 72 340.000 2]21.40 419.42 N ] 52.66 W 444.69 0.000
2620.08 32.036 340.000 2500.00 606.63 N 220.79 W 643.1 8 2.000
3226.35 52.941 334.464 2944.74 980.28 N 381.92 W 1049.94 3.500
9759.86 52.941 334.464 6882.1 0 5684.81 N 2629.47 W 6263.4 7 0.000
11406.91 20.000 334.660 8188.43 6556.50 N 3044.82 W 7229.01 2.000
11506.91 20.000 334.660 8282.40 6587.41 N 3059.46 W 7263.21 0.000
11851.71 20.000 334.660 8606.40 6693.99 N 3]09.93 W 7381.14 0.000
Current Well Properties
PSI-10 WP05
5966189.89 N, 708080.81 E
141.58 N, 323.85 E
700 18' 39.5321" N, 1480 18' 49.2921" W
Well:
Horizontal Coordinates:
Ref. Global Coordinates:
Ref. Structure:
Ref. Geographical Coordinates:
RKB Elevation:
51 .40ft above Mean Sea Level
51.40ft above Structure
North Reference:
Units:
True North
Feet (US)
å&h
Â
End Dir, Start Sail @ 52.941° : 3226.35ftMD,2944.74ftTVD
Increase in Dir Rate @ 3.500./10Oft : 2620.08ft MD, 25oo.00ft TVD
Begin Dir @ 2.0oo./100ft: 2191.87ft MD, 2121.4Oft TVD
End Dir, Start Sail @ 23.472° : 1864.8OftMD,1821.4OftTVD
Begin Dir @ 1.5oo./10Oft: 300.00ft MD, 300.0Oft TVD ~ \
Begin 16" Hole - ~
0
I
-2700
Scale: 1 inch = 900ft
I
-1800
I
-900
0
Reference is True North
Eastings (PSI slot J)
~e..~!:?~}l:"~~~ North Slope A._.!ka
P-Blk LI !';LqA2~~~-;;:;~;~ BPXA
0
1500 -
- 3000 -
-:>
-
0
<ñ
Ci5
~
..c
õ.. 4500 ---
Q)
0
-æ
(.)
'';::
:....
Q)
>
6000 - ,,_., ".,"''''N.'''.
~ 7500 -
0
LO
or-
II
..c
()
.£
å5
m
/A 9000 -
DrillQuest 2.00.09.006
1&
Vertical Origin:
Horizontal Origin:
Measurement Units:
North Reference:
Dogleg severity:
Vertical Section Azimuth:
Vertical Section Description:
Vertical Section Origin:
Measured Incl.
Depth
0.00
34.00
300.00
1864.80
2191.87
2620.08
3226.35
9759.86
11406.91
11506.91
11851.71
0.000
0.000
0.000
23.472
23.472
32.036
52.941
52.941
20.000
20.000
20.000
~Begin 16" Hole
~Begin Dir @ 1.500°/1000: 300.0Oft MD, 300.DOft TVD
~oo.oo
Lisburne p,->-East Dock)
PSI-10 WPOS/{ DrillQues{'
Proposal Data for PSI-10 WP05
PSI slot J
PSI slot J
ft
True North
Degrees per 100 feet (US)
335.080°
PSI slot J
0.00 N,O.OO E
Azim. Vertical Northings Eastings Vertical Dogleg
Depth Section Rate
0.000 0.00 0.00 N 0.00 E 0.00
0.000 34.00 O.OON 0.00 E 0.00 0.000
0.000 300.00 O.OON 0.00 E 0.00 0.000
340.000 1821.40 297.00 N 108.10 W 314.90 1.500
340.000 2121.40 419.42 N 152.66 W 444.69 0.000
340.000 2500.00 606.63 N 220.79 W 643.18 2.000
334.464 2944.74 980.28 N 381.92 W 1049.94 3.500
334.464 6882.10 5684.81 N 2629.47 W 6263.47 0.000
334.660 8188.43 6556.50 N 3044.82 W 7229.01 2.000
334.660 8282.40 6587.41 N 3059.46 W 7263.21 0.000
334.660 8606.40 6693.99 N 3109.93 W 7381.14 0.000
Current Well Properties
PSI-10 WP05
5966189.89 N, 708080.81 E
141.58 N, 323.85 E
70° 18' 39.5321" N, 1480 18' 49.2921 " W
Well:
Horizontal Coordinates:
Ref. Global Coordinates:
Ref. Structure:
Ref. Geographical Coordinates:
RKB Elevation:
51 AOft above Mean Sea Level
51AOft above Structure
True North
Feet (US)
End Dir, Start Sail @ 23.472°: 1864.8OOMD,1821.4OftTVD
- - - - - - - - - - - - - - - - - - - - - - - - ~AFHÕS'f,""T9'ð2.4õ¡t'hiTI'"
North Reference:
Units:
Begin Dir @ 2.0000/100ft : 2191.87ft M D, 2121.40ft TVD
Increase in Dir Rate @ 3.5000/10Oft: 2620.08ft MD, 2500.000 TVD
End Dir, Start Sail @ 52.941° : 3226.35ftMD,2944.74ftTVD
- - - - - - - - - - - - - - - - - - - ŠV4, :¡566.4'õttrV!)
- - - - - - - - - - - - - - - - - "šV3. 397(J.4'õftrVD
- - - - - - - - - - - - - - - - ŠV~.4'õttrV!)
,- -, -, ~- ~- , -, .
.- ".r.-...........",~"w -. _m....
....... T, ................ ..--... ---~ .-...~" .
- - - - - - - - - - - - - ŠV~.4'õttrV!)
- - - - - - - - - - - - 'TIG~.4ô«TVõ
uW- - - - - - - - - - üc¡'3;'5:m2:,4'ótï'rVõ
m..N i- -'" I." .t..-~
^'..6~^ -------ÜG~<4'ótï'rVõ
~'o
¡,A 00.00
1:>$
... -. A -.
Begin Dir @ 2.0000/100ft : 9759.86ft MD, 6882.100 TVD
- - WESTŠÃ.;,; 2. 6445/W¡t'rVõ
-oowEsrsÃk~<¡¡j¡t'rVõ
- - eM:!, 58:!4.4otTYìiõ
End Dir, Start Sail @ 20.000° : 11406.91ftMD,8188.43ftTVD ~ '
Begin 8-1/2" HOI~~
PS¡.10 11; $282.40 TVO, 6587.41 N, 305$.45 IN
::-;;:" .'...4' .;."
..."
Þ~U!L ¥.N.-¥.- M _t--"_lJm~..--~'J1!L V'._w"w..
I
0 1500
Scale: 1 inch = 1500ft
,. ,-
- -Tt-IRZ. $1¡)ûAO!t TVD
iJfTl3:TCGl, 8287.4O[t lYO
GL. $348.40ft TVa
'8. IJ385.4{J1tTVD
- ......6SAD, 8584.40f! TVD
rD, 8506.4Gf! TVD
7" Liner
11851.71ft MD
8606.400 TVD
'.',....
".. ,. 'A
@
..~.~.~...~...
-~--1
PS¡.i(} TD: $506.40 TVD, 5593.$9 N, 3i[}9.93 W ".""."'"
Total Depth: 11851.71ftMD,8606.4OOTVD
I I I
4500 6000 7500
Section Azimuth: 335.080° (True North)
Vertical Section (PSI slot J)
I
3000
spe"""r"1y-sun North Slope A.Jka
OfULLING ¡\~:t>:~~~:~: BPXA
Lisburne p_.~East Dock) DrillQuesl
PSI-10 WP05
y",1W
Single Well Target Data for PSI-10 WP05
Measurement Units: it
Coordinate
Target Point TVD Northings Eastings SSTVD Northings Eastings Target
Name Type ASPY ASP X Shape
PSI-lO Tl Entry Point 8282.40 6587.41 N 3059.46 W 8231.00 5972690.00 N 704840.00 E Point
PSI-lO TD Entry Point 8606.40 6693.99 N 3109.93 W 8555.00 5972795.14 N 704786.60 E Polygon
Driller's Poly @ 95% 6773.17 N 8555.00 5972874.84 N 704804.41 E
Boundary Point A 8606.40 3089.91 W
B 8606.40 6750.04 N 3064.51 W 8555.00 5972852.43 N 704830.44 E
C 8606.40 6725.60 N 3047.66 W 8555.00 5972828.46 N 704847.97 E
D 8606.40 6698.46 N 3036.40 W 8555.00 5972801.64 N 704859.97 E
E 8606.40 6665.71 N 3030.64 W 8555.00 5972769.07 N 704866.64 E
F 8606.40 6624.72 N 3034.84 W 8555.00 5972727.98 N 704863.58 E
G 8606.40 6603.08 N 3044.45 W 8555.00 5972706.08 N 704854.57 E
H 8606.40 6588.37 N 3062.35 W 8555.00 5972690.88 N 704837.08 E
I 8606.40 6586.10 N 3085.42 W 8555.00 5972687.97 N 704814.09 E
J 8606.40 6593.35 N 3107.47 W 8555.00 5972694.61 N 704791.84 E
K 8606.40 6616.46 N 3140.52 W 8555.00 5972716.79 N 704758.17 E
L 8606.40 6642.04 N 3161.77 W 8555.00 5972741.77 N 704736.21 E
M 8606.40 6668.92 N 3175.37 W 8555.00 5972768.27 N 704721.87 E
N 8606.40 6698.79 N 3183.03 W 8555.00 5972797.91 N 704713.39 E
0 8606.40 6734.39 N 3183.55 W 8555.00 5972833.48 N 704711.88E
P 8606.40 6754.89 N 3179.34 W 8555.00 5972854.09 N 704715.52 E
Q 8606.40 6775.27 N 3169.51 W 8555.00 5972874.74 N 704724.79 E
R 8606.40 6788.94 N 3151.61 W 8555.00 5972888.90 N 704742.30 E
S 8606.40 6790.73 N 3128.88 W 8555.00 5972891.32 N 704764.97 E
T 8606.40 6783.49 N 3107.46 W 8555.00 5972884.67 N 704786.58 E
PSI-lO TD Geo Circle Entry Point 8606.40 6693.99 N 3109.93 W 8555.00 5972795.14 N 704786.60 E Circle
PSI-10 WP05 Formations
Measured Vertical Sub-Sea
Depth Depth Depth Dip Dip Dir. Formation Name
(ft) (ft) (ft) (Deg) (Deg)
1953.11 1902.40 1851.00 0.000 0.000 BPERMAFROST
4257.91 3566.40 3515.00 0.000 0.000 SV4
4928.29 3970.40 3919.00 0.000 0.000 SV3
5261.82 4171.40 4120.00 0.000 0.000 SV2
5885.74 4547.40 4496.00 0.000 0.000 SV1
6707.13 5042.40 4991.00 0.000 0.000 UG4
7072.19 5262.40 5211.00 0.000 0.000 UG3
8142.48 5907.40 5856.00 0.000 0.000 UG1
9035.22 6445.40 6394.00 0.000 0.000 WEST SAK 2
9343.86 6631.40 6580.00 0.000 0.000 WEST SAK 1
9680.71 6834.40 6783.00 0.000 0.000 CM3
11312.65 8100.40 8049.00 0.000 0.000 THRZ
11512.23 8287.40 8236.00 0.000 0.000 BHRZ/LCU/TZ3/TCGL
11577.15 8348.40 8297.00 0.000 0.000 TZ2C/BCGL
11617.59 8386.40 8335.00 0.000 0.000 TZ2B/23SB
11828.29 8584.40 8533.00 0.000 0.000 BSAD
11851.71 8606.40 8555.00 0.000 0.000 TD
DrillQuest 2.00.09.006
Sper.)-Sun Drilling Se.}ices
Proposal Data - PSI-10 WPS - PSI-10 WP05
001 = 5.6
APPROVED PLAN
MD Delta Inclin. Azimuth TVD Delta Northings Eastings Dogleg A. Build A.Turn Toolface VS (335°)
(ft) MD (ft) (°) (°) (ft) TVD (ft) (ft) (ft) (0/100ft) (0/10Oft) (°/1 OOft) (°) (ft)
.1 ........ ... ....... .. Î"" ''''' ....... .... .m..... n. ........... ........... ............,... . n.... . .n.
1 0.00 0.00 0.00. 0.00 0.00 0.00: . .. ö. ~o.d.. 0.0
.. ... .: 34..:6~:! ::.:: ... n.... ';"' . .......: .:ö::.qoi: ::.... .: .~~~9.Ö:':: ........... .... .. ..
2 34.00 0.00 . . 2~::.66.1 0.00 0.00: 0.00 0.00 0.00 0.0
.1. ...... ... . u ... ...." .... .. ... . ....
3' 300.00 266.:~0.L. 0.00; ...... .~.:.o.<?i... ... 3~~.00!.. 0.00 0.00: 0.00: 0.00. ...O'~°l... 0.00 0.0
. ..... I.. ...... ...... .. m...n ......1 .. .. ... .... .n..
4' i 1 864.80 1564.80 23.47. 340.00 1821 .40 ' ...1521.40 i 297.00 N. 108.10 W' 1.50: 1.50: 0.00. 340.00 314.9
. ..... ..... .. ..... ....3.~o:ooj .~12.<~~:.. .....n ... ... .m.. . . .. ..
5' I 2191.87 327.06: 23.47' 300.00: 419.42N: 152.66 W 0.00: 0.00: 0.00. 0.00 444.7
I
u. ........ ,n ... .n.. ... .. . .n.... .¡... ... ......n ....
6' I 2620.08. 428.22, 32.04. 340.001 2500.00 378.60: 606.63 N; 220.79 W 2.00 2.00; 0.00. 0.00. 643.2
..... m..........
7 3226.35 606.26 52.94 334.46 2944.74 444.74 980.28 N 381 .92 W 3.50 3.45 -0.91 347.72 1049.9
8 9759.86 6533.52 52.94 334.46 6882.10 3937.36 5684.81 N 2629.47 W 0.00 0.00 0.00 0.00 6263.5
9 11406.91 1647.05 20.00 334.66 8188.43 1306.33 6556.50 N 3044.82 W 2.00 -2.00 0.01 179.88 7229.0
10T 11506.91 100.00 20.00 334.66 8282.40 93.97 6587.41 N 3059.46 W 0.00 0.00 0.00 0.00 7263.2
..m. .._-,--,--,-- -.....-.....-................... --~_. .......................................---.--.,-"".- 0.001 ~------".,-
11' 11851.71 344.79: 20.00 334.66 8606.40 324.00 6693.99 N. 3109.93 W 0.00 0.00 0.00 7381.1
25 July, 2002 -13:18
-1 -
DrillQuest
A
Lisburne PSI "'ast Dock), Slot PSI slot J
PSI-10 WPS - PSI-10 WP05
~
Revised: 25 July, 2002
PROPOSAL REPORT
29 July, 2002
~
Surface Coordinates: 5966189.89 N, 708080.81 E (700 18' 39.5321" N, 1480 18' 49.2921" W)
Surface Coordinates relative to Project H Reference: 966189.89 N, 208080.81 E (Grid)
Surface Coordinates relative to Structure: 141.58 N, 323.85 E (True)
Kelly Bushing: 51.40ft above Mean Sea Level
5pE!""""""~-!5UI!
DRILLING. SERVIC:ES
A HaUiburtønCompany
Proposal Ref: pro 11253
Sperry-Sun Drilling Services
Proposal Report for PSI-1O WPS - PSI-10 WP05
Revised: 25 July, 2002
BPXA
North Slope Alaska Lisburne PSI (East Dock)
Measured Sub-Sea Vertical Local Coordinates Global Coordinates ertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft)
0.00 0.000 0.000 -51.40 0.00 O.OON 0.00 E 5966189.89 N 708080.81 E 0.00 Begin 16" Hole
34.00 0.000 0.000 -17.40 34.00 0.00 N 0.00 E 5966189.89 N 7°880:81 E 0.000 0.00
300.00 0.000 0.000 248.60 300.00 O.OON 0.00 E 5966189.89 N 708080.81 E 0.000 0.00 Begin Dir @ 1.5000/100ft: 300.00ft
MD, 300.00ft TVD
400.00 1.500 340.000 348.59 399.99 5966191.11 N 708080.33 E 1.500 1.30
500.00 3.000 340.000 448.51 499.91 5966194.76 N 708078.88 E 1.500 5.22 .~
600.00 4.500 340.000 548.29 708076.48 E 1.500 11.73
700.00 6.000 340.000 647.87 708073.11 E 1.500 20.85
800.00 7.500 340.000 747.17 708068.79 E 1.500 32.56
900.00 9.000 340.000 846.14 708063.51 E 1.500 46.85
1000.00 10.500 340.000 944.69 708057.28 E 1.500 63.73
1100.00 12.000 340.000 1042.76",,"^ 28.55 W 5966267.51 N 708050.10 E 1.500 83.16
1200.00 13.500 340.000 1140.30 36.10 W 5966288.03 N 708041 .98 E 1.500 105.15
1300.00 15.000 340.000 123722 44.52 W 5966310.91 N 708032.92 E 1.500 129.67
1400.00 16.500 340.000 1333.46 53.80 W 5966336.15 N 708022.94 E 1.500 156.72
1500.00 18.000 340.000 1428.96 63.94 W 5966363.73 N 708012.03 E 1.500 186.26
1600.00 19.500 1523.65 1575.05 205.88 N 74.93 W 5966393.62 N 708000.20 E 1.500 218.29
1700.00 21 .000 1617.46 1668.86 238.40 N 86.77 W 5966425.80 N 707987.47 E 1.500 252.77
1800.00 22.500 1710.34 1761.74 273.22 N 99.45 W 5966460.25 N 707973.83 E 1.500 289.69
1864.80 23.472 1770.00 1821.40 297.00 N 108.10W 5966483.78 N 707964.52 E 1.500 314.90 End Dir, Start Sail @ 23.472° :
1864.80ftMD,1821.40ftTVD
1900.00 23.472 340.000 1802.28 1853.68 310.18 N 112.90 W 5966496.82 N 707959.36 E 0.000 328.87
1953.11 23.472 340.000 1851.00 1902.40 330.06 N 120.13 W 5966516.49 N 707951.58 E 0.000 349.94 BPERMAFROST -.-I"
2000.00 23.472 340.000 1894.01 1945.41 347.61 N 126.52 W 5966533.86 N 707944.71 E 0.000 368.55
2100.00 23.472 340.000 1985.74 2037.14 385.03 N 140.14 W 5966570.89 N 707930.05 E 0.000 408.23
2191.87 23.472 340.000 2070.00 2121.40 419.42 N 152.66 W 5966604.92 N 707916.59 E 0.000 444.69 Begin Dir @ 2.0000/100ft: 2191.87ft
MD, 2121.40ft TVD
2200.00 23.635 340.000 2077.46 2128.86 422.47 N 153.77 W 5966607.94 N 707915.40 E 2.000 447.93
2300.00 25.635 340.000 2168.35 2219.75 461.64 N 168.02 W 5966646.70 N 707900.06 E 2.000 489.46
2400.00 27.635 340.000 2257.73 2309.13 503.76 N 183.35 W 5966688.38 N 707883.57 E 2.000 534.12
2500.00 29.635 340.000 2345.50 2396.90 548.79 N 199.74 W 5966732.94 N 707865.94 E 2.000 581.86
2600.00 31 .635 340.000 2431.54 2482.94 596.67 N 217.17 W 5966780.32 N 707847.19 E 2.000 632.63
2620.08 32.036 340.000 2448.60 2500.00 606.63 N 220.79 W 5966790.17 N 707843.29 E 2.000 643.18 Increase in Dir Rate @ 3.5000/100ft:
2620.08ft MD, 2500.00ft TVD
29 July, 2002 - 9:17 Page 2 of 11 Dri/IQuest 2.00.09.006
Sperry-Sun Drilling Services '8'
Proposal Report for PSI-10 WPS - PSI-10 WP05
Revised: 25 July, 2002
BPXA
North Slope Alaska Lisburne PSI (East Dock)
Measured Sub-Sea Vertical Local Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings Comment
(ft) (ft) (ft) (ft) (ft)
2700.00 34.774 338.957 2515.31 2566.71 647.82 N 3.500 687.05
2800.00 38.210 337.838 2595.69 2647.09 703.10 N 3.500 746.41
2900.00 41 .656 336.879 2672.36 2723.76 762.32 N 3.500 810.54
3000.00 45.108 336.040 2745.03 2796.43 825.28 N 3.500 879.19
3100.00 48.566 335.297 2813.43 2864.83 891.72 N 3.500 952.12 ~
3200.00 52.028 334.630 2877.30 2928.70 707681.38 E 3.500 1029.04
3226.35 52.941 334.464 2893.34 2944.74 707671 .88 E 3.500 1049.94 End Dir, Start Sail @ 52.9410 :
3226.35ftM D ,2944.7 4ftTVD
3300.00 52.941 334.464 2937.73 2989.13 5967211.53 N 707645.08 E 0.000 1108.71
3400.00 52.941 334.464 2997.99 3049.39 5967282.55 N 707608.70 E 0.000 1188.51
3500.00 52.941 334.464 3058.26 31 5967353.58 N 707572.32 E 0.000 1268.30
3600.00 52.941 334.464 3118.52.,ø< 'Wtf4~¡;a49.34 N 510.45 W 5967424.60 N 707535.94 E 0.000 1348.10
3700.00 52.941 334.464 3178.78 1321.34 N 544.85 W 5967495.63 N 707499.55 E 0.000 1427.90
3800.00 52.941 334.464 3239.05 1393.35 N 579.25 W 5967566.65 N 707463.17 E 0.000 1507.69
3900.00 52.941 334.464 3299.31 1465.35 N 613.66 W 5967637.68 N 707426.79 E 0.000 1587.49
4000.00 52.941 334.464 3359.58 1537.36 N 648.06 W 5967708.70 N 707390.41 E 0.000 1667.29
4100.00 52.941 3471.24 1609.37 N 682.46 W 5967779.73 N 707354.02 E 0.000 1747.08
4200.00 52.941 3531.50 1681.37 N 716.86 W 5967850.75 N 707317.64 E 0.000 1826.88
4257.91 52.941 3566.40 1723.07 N 736.78 W 5967891.88 N 707296.57 E 0.000 1873.09 SV4
4300.00 52.941 3591.77 1753.38 N 751.26 W 5967921.78 N 707281.26 E 0.000 1906.68
4400.00 52.941 3652.03 1825.38 N 785.66 W 5967992.80 N 707244.88 E 0.000 1986.47
4500.00 52.941 334.464 3660.90 3712.30 1897.39 N 820.06 W 5968063.83 N 707208.49 E 0.000 2066.27 '-/
4600.00 52.941 334.464 3721.16 3772.56 1969.40 N 854.46 W 5968134.85 N 707172.11 E 0.000 2146.07
4700.00 52.941 334.464 3781.42 3832.82 2041.40 N 888.86 W 5968205.88 N 707135.73 E 0.000 2225.86
4800.00 52.941 334.464 3841 .69 3893.09 2113.41 N 923.26 W 5968276.90 N 707099.35 E 0.000 2305.66
4900.00 52.941 334.464 3901.95 3953.35 2185.41 N 957.66 W 5968347.93 N 707062.96 E 0.000 2385.46
4928.29 52.941 334.464 3919.00 3970.40 2205.78 N 967.39 W 5968368.02 N 707052.67 E 0.000 2408.03 SV3
5000.00 52.941 334.464 3962.22 4013.62 2257.42 N 992.06 W 5968418.96 N 707026.58 E 0.000 2465.25
5100.00 52.941 334.464 4022.48 4073.88 2329.43 N 1026.46 W 5968489.98 N 706990.20 E 0.000 2545.05
5200.00 52.941 334.464 4082.74 4134.14 2401.43 N 1060.86 W 5968561.01 N 706953.82 E 0.000 2624.85
5261.82 52.941 334.464 4120.00 4171.40 2445.95 N 1082.13 W 5968604.91 N 706931 .33 E 0.000 2674.18 SV2
29 July, 2002 - 9:17
Page 3 of 11
DrillQuest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for PSI-1 0 WPS - PSI-10 WP05
Revised: 25 July, 2002
BPXA
North Slope Alaska Lisburne PSI (East Dock)
Measured Sub-Sea Vertical Local Coordinates Global Coordinates ertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft)
5300.00 52.941 334.464 4143.01 4194.41 2473.44 N 1095.26 W 5968632.03 N 0.000 2704.64
5400.00 52.941 334.464 4203.27 4254.67 2545.44 N 1129.66W 5968703.06 N 0.000 2784.44
5500.00 52.941 334.464 4263.54 4314.94 2617.45 N 1164.06 W 5968774.08 N 0.000 2864.24
5600.00 52.941 334.464 4323.80 4375.20 2689.46 N 1198.46 W 5968845.11 N 0.000 2944.03
5700.00 52.941 334.464 4384.06 4435.46 2761.46 N 1232.86 W 5968916.13 N 0.000 3023.83 ~
5800.00 52.941 334.464 4444.33 6 W'~'">~v;5968987 .16 N 706735.52 E 0.000 3103.63
5885.74 52.941 334.464 4496.00 '\lJié'5969048.05 N 706704.33 E 0.000 3172.05 SV1
5900.00 52.941 334.464 4504.59 5969058.18 N 706699.14 E 0.000 3183.42
6000.00 52.941 334.464 4564.86 5969129.21 N 706662.76 E 0.000 3263.22
6051 .68 52.941 334.464 4596.00 5969165.91 N 706643.96 E 0.000 3304.46 Begin 12-1/4" Hole
13 3/8" Casing
6100.00 52.941 334.464 4625.12"", 1370.46 W 5969200.23 N 706626.38 E 0.000 3343.02
6200.00 52.941 334.464 4685.38 1404.86 W 5969271.26 N 706589.99 E 0.000 3422.81
6300.00 52.941 334.464 4745.65 1439.26 W 5969342.28 N 706553.61 E 0.000 3502.61
6400.00 52.941 334.464 4805.91 1473.67 W 5969413.31 N 706517.23 E 0.000 3582.41
6500.00 52.941 334.464 4866.18 1508.07 W 5969484.33 N 706480.85 E 0.000 3662.21
6600.00 52.941 4926.44 4977.84 3409.52 N 1542.47 W 5969555.36 N 706444.46 E 0.000 3742.00
6700.00 52.941 986.70 5038.10 3481.52 N 1576.87 W 5969626.38 N 706408.08 E 0.000 3821.80
6707.13 52.941 4991 .00 5042.40 3486.66 N 1579.32 W 5969631.45 N 706405.49 E 0.000 3827.49 UG4
6800.00 52.941 5046.97 5098.37 3553.53 N 1611 .27 W 5969697.41 N 706371.70 E 0.000 3901.60
6900.00 52.941 5107.23 5158.63 3625.53 N 1645.67 W 5969768.43 N 706335.32 E 0.000 3981.39
7000.00 52.941 334.464 5167.50 5218.90 3697.54 N 1680.07 W 5969839.46 N 706298.93 E 0.000 4061.19
7072.19 52.941 334.464 5211.00 5262.40 3749.52 N 1704.90 W 5969890.73 N 706272.67 E 0.000 4118.79 UG3
7100.00 52.941 334.464 5227.76 5279.16 3769.55 N 1714.47 W 5969910.48 N 706262.55 E 0.000 4140.99
7200.00 52.941 334.464 5288.02 5339.42 3841.55 N 1748.87 W 5969981.51 N 706226.17 E 0.000 4220.78
7300.00 52.941 334.464 5348.29 5399.69 3913.56 N 1783.27 W 5970052.53 N 706189.79 E 0.000 4300.58
7400.00 52.941 334.464 5408.55 5459.95 3985.56 N 1817.67 W 5970123.56 N 706153.41 E 0.000 4380.38
7500.00 52.941 334.464 5468.82 5520.22 4057.57 N 1852.07 W 5970194.58 N 706117.02 E 0.000 4460.17
7600.00 52.941 334.464 5529.08 5580.48 4129.58 N 1886.47 W 5970265.61 N 706080.64 E 0.000 4539.97
7700.00 52.941 334.464 5589.34 5640.74 4201.58 N 1920.87 W 5970336.63 N 706044.26 E 0.000 4619.77
7800.00 52.941 334.464 5649.61 5701 .01 4273.59 N 1955.27 W 5970407.66 N 706007.88 E 0.000 4699.56
29 July, 2002 - 9:17
Page 4 of 11
DrillQuest 2.00.09.006
1>
Sperry-Sun Drilling Services
Proposal Report for PSI-10 WPS - PSI-10 WP05
Revised: 25 July, 2002
BPXA
North Slope Alaska Lisburne PSI (East Dock)
Measured Sub-Sea Vertical Local Coordinates Global Coordinates ertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft)
7900.00 52.941 334.464 5709.87 5761 .27 4345.59 N 1989.67 W 5970478.69 N 0.000 4779.36
8000.00 52.941 334.464 5770.14 5821 .54 4417.60 N 2024.07 W 5970549.71 N 0.000 4859.16
8100.00 52.941 334.464 5830.40 5881.80 4489.61 N 2058.47 W 5970620.74 N 0.000 4938.95
8142.48 52.941 334.464 5856.00 5907.40 4520.19 N 2073.09 W 5970650.91 N 0.000 4972.85 UG1
8200.00 52.941 334.464 5890.66 5942.06 4561.61 N 2092.87 W 5970691.76 N 0.000 5018.75 ~.
8300.00 52.941 334.464 5950.93 6002.33 4633.62 N . 7 W""",,þ970762. 79 N 705825.96 E 0.000 5098.55
8400.00 52.941 334.464 6011.19 6062.59 47031122 N 7 "\jrlt"5970833.81 N 705789.58 E 0.000 5178.34
8500.00 52.941 334.464 6071 .46 6122.86 471ii;¡t;$,N 5970904.84 N 705753.20 E 0.000 5258.14
8600.00 52.941 334.464 6131.72 6183.12 4849.64 N 5970975.86 N 705716.82 E 0.000 5337.94
8700.00 52.941 334.464 6191.98 6243.38 4921.64 N 5971046.89 N 705680.43 E 0.000 5417.73
8800.00 52.941 334.464 6252.25 4993.65 N 2299.28 W 5971117.91 N 705644.05 E 0.000 5497.53
8900.00 52.941 334.464 6312.5l".." >wvi065.65 N 2333.68 W 5971188.94 N 705607.67 E 0.000 5577.33
9000.00 52.941 334.464 6372.78 5137.66 N 2368.08 W 5971259.96 N 705571 .29 E 0.000 5657.12
9035.22 52.941 334.464 6394.00 5163.02 N 2380.19 W 5971284.98 N 705558.47 E 0.000 5685.23 WEST SAK 2
9100.00 52.941 334.464 6433.04 5209.67 N 2402.48 W 5971330.99 N 705534.91 E 0.000 5736.92
9200.00 52.941 6493.30. 6544.70 5281.67 N 2436.88 W 5971402.01 N 705498.52 E 0.000 5816.72
9300.00 52.941 6553.57 6604.97 5353.68 N 2471.28 W 5971473.04 N 705462.14 E 0.000 5896.51
9343.86 52.941 580.00 6631.40 5385.26 N 2486.37 W 5971504.19 N 705446.18 E 0.000 5931.51 WEST SAK 1
9400.00 52.941 6613.83 6665.23 5425.68 N 2505.68 W 5971544.06 N 705425.76 E 0.000 5976.31
9500.00 52.941 6674.10 6725.50 5497.69 N 2540.08 W 5971615.09 N 705389.38 E 0.000 6056.11
9600.00 52.941 334.464 6734.36 6785.76 5569.70 N 2574.48 W 5971686.11 N 705352.99 E 0.000 6135.90
9680.71 52.941 334.464 6783.00 6834.40 5627.81 N 2602.24 W 5971743.44 N 705323.63 E 0.000 6200.31 CM3 .~
9700.00 52.941 334.464 6794.62 6846.02 5641.70 N 2608.88 W 5971757.14 N 705316.61 E 0.000 6215.70
9759.86 52.941 334.464 6830.70 6882.10 5684.81 N 2629.47 W 5971799.66 N 705294.83 E 0.000 6263.47 Begin Dir @ 2.000o/100ft : 9759.86ft
MD, 6882.1 Oft TVD
9800.00 52.138 334.466 6855.11 6906.51 5713.55 N 2643.21 W 5971828.01 N 705280.31 E 2.000 6295.33
9900.00 50.138 334.472 6917.85 6969.25 5783.81 N 2676.76 W 5971897.31 N 705244.81 E 2.000 6373.18
10000.00 48.138 334.478 6983.27 7034.67 5852.06 N 2709.35 W 5971964.63 N 705210.35 E 2.000 6448.80
10100.00 46.138 334.484 7051 .29 7102.69 5918.20 N 2740.93 W 5972029.87 N 705176.95 E 2.000 6522.10
10200.00 44.138 334.491 7121 .83 7173.23 5982.17 N 2771 .45 W 5972092.97 N 705144.66 E 2.000 6592.97
10300.00 42.138 334.499 7194.80 7246.20 6043.88 N 2800.90 W 5972153.84 N 705113.52 E 2.000 6661.34
29 July, 2002 - 9: 17
Page 5 of 11
DrillQuest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for PSI-tO WPS - PSI-tO WP05
Revised: 25 July, 2002
BPXA
North Slope Alaska Lisburne PSI (East Dock)
Measured Sub-Sea Vertical Local Coordinates Global Coordinates
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft)
10400.00 40.138 334.506 7270.10 7321 .50 6103.26 N 2.000 6727.12
10500.00 38.138 334.515 7347.66 7399.06 6160.23 N 2.000 6790.23
10600.00 36.138 334.525 7427.38 7478.78 6214.73 N 2.000 6850.60
10700.00 34.138 334.535 7509.15 7560.55 6266.69 N 2.000 6908.15
10800.00 32.138 334.546 7592.88 7644.28 6316.04 N 2.000 6962.81 ........."
1 0900.00 30.138 334.559 7678.47 2468.36 N 704952.83 E 2.000 7014.52
11000.00 28.138 334.574 7765.81 5972511.73 N 704930.71 E 2.000 7063.20
11100.00 26.138 334.590 7854.80 5972552.37 N 704910.00 E 2.000 7108.81
11200.00 24.138 334.609 7945.32 5972590.23 N 704890.72 E 2.000 7151.29
11300.00 22.138 334.632 8037.27 5972625.25 N 704872.90 E 2.000 7190.58
11312.65 21 .885 334.635 8049.00 3030.39 W 5972629.47 N 704870.75 E 2.000 7195.32 THRZ
11400.00 20.138 334.658 8130.54"""0 3043.81 W 5972657.39 N 704856.56 E 2.000 7226.64
11406.91 20.000 334.660 8137.03 3044.82 W 5972659.51 N 704855.49 E 2.000 7229.01 End Dir, Start Sail @ 20.000° :
11406.91ftMD,8188.43ftTVD
11477.23 20.000 334.660 8203.11 6578.24 N 3055.11 W 5972680.95 N 704844.60 E 0.000 7253.06 Begin 8-1/2" Hole
9 5/8" Casing
11500.00 20.000 8275.90 6585.27 N 3058.45 W 5972687.89 N 704841 .07 E 0.000 7260.85
11506.91 20.000 231.00 8282.40 6587.41 N 3059.46 W 5972690.00 N 704840.00 E 0.000 7263.21 Target - PSI-10 T1, Drillers
11512.23 20.000 8236.00 8287.40 6589.06 N 3060.24 W 5972691.62 N 704839.18 E 0.000 7265.03 BH RZlLCUfTZ3fTCGL
11577.15 20.000 8297.00 8348.40 6609.12 N 3069.74 W 5972711 .42 N 704829.12 E 0.000 7287.24 TZ2C/BCGL
11600.00 20.000 8318.47 8369.87 6616.19 N 3073.09 W 5972718.39 N 704825.58 E 0.000 7295.05
11617.59 20.000 8335.00 8386.40 6621.62 N 3075.66 W 5972723.75 N 704822.86 E 0.000 7301 .07 TZ2B/23SB
~
11700.00 20.000 334.660 8412.44 8463.84 6647.10 N 3087.72 W 5972748.88 N 704810.09 E 0.000 7329.25
11800.00 20.000 334.660 8506.41 8557.81 6678.01 N 3102.36 W 5972779.37 N 704794.60 E 0.000 7363.45
11828.29 20.000 334.660 8533.00 8584.40 6686.75 N 3106.50 W 5972788.00 N 704790.22 E 0.000 7373.13 BSAD
11851.71 20.000 334.660 8555.00 8606.40 6693.99 N 3109.93 W 5972795.14 N 704786.60 E 0.000 7381.14 Total Depth:
11851.71ftMD,8606.40ftTVD
7" Liner
TO
Target - PSI-1 0 TO Geo Circle, 150.0C
Radius., Geological
29 July, 2002 - 9:17
Page 6 of 11
DrillQuest 2.00.09.006
North Slope Alaska
Sperry-Sun Drilling Services
Proposal Report for PSI-10 WPS - PSI-10 WP05
Revised: 25 July, 2002
All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to PSI slot J. Northings and Eastings are relative to PSI slot J.
Magnetic Declination at Surface is 26.488° (24-Jul-02)
The Dogleg Severity is in Degrees per 100 feet (US).
Vertical Section is from PSI slot J and calculated along an Azimuth of 335.080° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 11851.71 ft.,
The Bottom Hole Displacement is 7381.14ft., in the Direction of 335.081 ° (True).
Comments
Measured
Depth
(ft)
0.00
300.00
1864.80
2191.87
2620.08
3226.35
6051.68
9759.86
11406.91
11477.23
11851.71
29 July, 2002 - 9:17
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
~tlJ.äf>
0.00 E
0.00 E
108.10 W
152.66 W
220.79 W
980.28 N 381.92 W
3014.69 N 1353.84 W
5684.81 N 2629.47 W
6556.50 N 3044.82 W
6578.24 N 3055.11 W
8606.40 6693.99 N 3109.93 W
Comment
Begin 16" Hole
Begin Dir @ 1.5000/100ft: 300.00ft MD, 300.00ft TVD
End Dir, Start Sail @ 23.472°: 1864.80ftMD,1821.40ftTVD
Begin Dir @ 2.0000/100ft : 2191.87ft MD, 2121.40ft TVD
Increase in Dir Rate @ 3.5000/100ft: 2620.08ft MD, 2500.00ftTVD
End Dir, Start Sail @ 52.941°: 3226.35ftMD,2944.74ftTVD
Begin 12-1/4" Hole
Begin Dir @ 2.0000/100ft : 9759.86ft MD, 6882.1 Oft TVD
End Dir, Start Sail @ 20.000° : 11406.91ftMD,8188.43ftTVD
Begin 8-1/2" Hole
Total Depth: 11851.71ftMD,8606.40ftTVD
Page 7 of 11
BPXA
Lisburne PSI (East Dock)
~'
DrillQuest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for PSI-10 WPS - PSI-10 WP05
Revised: 25 July, 2002
North Slope Alaska
Formation Tops
Formati on Plane Profile Penetration Poi n t
(Below Well Origin) Measured Vertical Sub-Sea
Sub-Sea Dip Dip Dir. Depth Depth Depth Eastings Formation Name
(ft) Deg. Deg. (ft) (ft) (ft)
1851.00 0.000 0.000 1953.11 1902.40 1851.00 \I~ERMAFROST
3515.00 0.000 0.000 4257.91 3566.40 3515.00 SV4
3919.00 0.000 0.000 4928.29 3970.40 3919.00 SV3
4120.00 0.000 0.000 5261.82 4171.40 4120.00 SV2
4496.00 0.000 0.000 5885.74 4547.40 4496.00 SV1
4991.00 0.000 0.000 6707.13 5042.40 ";'¡1;1_86.66 N 1579.32 W UG4
5211.00 0.000 0.000 7072.19 5262.40 3749.52 N 1704.90 W UG3
5856.00 0.000 0.000 8142.48 5907.40 4520.19 N 2073.09 W UG1
6394.00 0.000 0.000 9035.22 6445.40 5163.02 N 2380.19 W WEST SAK 2
6580.00 0.000 0.000 9343.86 6631.40 ;\9580.00 5385.26 N 2486.37 W WEST SAK 1
6783.00 0.000 9680.71 6834.40 6783.00 5627.81 N 2602.24 W CM3
8049.00 0.000 11312.65 8100.40 8049.00 6526.05 N 3030.39 W THRZ
8236.00 0.000 1.1512.23 8287.40 8236.00 6589.06 N 3060.24 W BHRZlLCUfTZ3fTCGL
8297.00 0.000 1577.15 8348.40 8297.00 6609.12 N 3069.74 W TZ2C/BCGL
8335.00 0.000 -617.59 8386.40 8335.00 6621.62 N 3075.66 W TZ2B/23SB
8533.00 0.000 11828.29 8584.40 8533.00 6686.75 N 3106.50 W BSAD
8555.00 0.000 11851.71 8606.40 8555.00 6693.99 N 3109.93 W TD
29 July, 2002 - 9:17
Page 8 of 11
BPXA
Lisburne PSI (East Dock)
DrillQuest 2.00.09.006
Sperry-Sun Drilling Services
Proposal Report for PSI-10 WPS - PSI-10 WP05
Revised: 25 July, 2002
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
BPXA
Lisburne PSI (East Dock)
North Slope Alaska
Casing details
To
Measured Vertical
Depth Depth
(ft) (ft)
Casing Detail
<Surface> <Surface>
<Surface> <Surface>
<Surface> <Surface>
6051.68
11477.23
11851.71
4647.40
8254.51
8606.40
13 3/8" Casing
9 5/8" Casing
7" Liner
.....",1
Targets associated with this well path
PSI-10T1
Target Entry Coordinates
TVD Northings Eastings Target Target
(ft) (ft) (ft) Shape Type
8282.40 6587.41 N 3059.46 W Point Drillers
Mean Sea Level/Global Coordinates: 8231.00 5972690.00 N 704840.00 E
Geographical Coordinates: 70019' 44.3160" N 148020' 18.6149" W
8606.40 6693.99 N 3109.93 W Polygon Drillers
Mean Sea Level/Global Coordinates: 8555.00 5972795.14 N 704786.60 E
Geographical Coordinates: 700 19' 45.3641" N 148020' 20.0897" W
Target Boundary Point #1 8606.40 6773.17 N 3089.91 W
#2 8606.40 6750.04 N 3064.51 W
#3 8606.40 6725.60 N 3047.66 W
#4 8606.40 6698.46 N 3036.40 W
#5 8606.40 6665.71 N 3030.64 W
#6 8606.40 6624.72 N 3034.84 W
#7 8606.40 6603.08 N 3044.45 W
#8 8606.40 6588.37 N 3062.35 W
#9 8606.40 6586.10 N 3085.42 W
#10 8606.40 6593.35 N 3107.47 W
#11 8606.40 6616.46 N 3140.52 W
#12 8606.40 6642.04 N 3161.77 W
#13 8606.40 6668.92 N 3175.37 W
#14 8606.40 6698.79 N 3183.03 W
#15 8606.40 6734.39 N 3183.55 W
#16 8606.40 6754.89 N 3179.34 W
Page 9 of 11
DrillQuest 2.00.09.006
Target
Name
PSI-10 TD Driller'
29 July, 2002 - 9:17
North Slope Alaska
Target
Name
29 July, 2002 - 9: 17
Sperry-Sun Drilling Services
Proposal Report for PSI-1O WPS - PSI-10 WP05
Revised: 25 July, 2002
Mean Sea Level/Global Coordinates #1
#2
#3
#4
#5
#6
#7
#8
#9
#10
#11
#12
#13
#14
#15
#16
#17
#18
#19
#20
Geographical Coordinates #1
#2
#3
#4
#5
#6
#7
#8
#9
#10
#11
#12
#13
#14
Page 10 of 11
#17
#18
#19
#20
8555.00
8555.00
8555.00
8555.00
8555.00
8555.00
8555.00
8555.00
8555.00
8555.00
8555.00
8555.00
8555.00
8555.00
8555.00
8555.00
8555.00
8555.00
8555.00
8555.00
Entry Coordin
Northings
(ft)
6775.27 N
6788.94 N
\fiff;i!90.73 N
£783.49 N
5972874.84 N
5972852.43 N
5972828.46 N
5972801 .64 N
5972769.07 N
5972727.98 N
5972706.08 N
5972690.88 N
5972687.97 N
5972694.61 N
5972716.79 N
5972741.77 N
5972768.27 N
5972797.91 N
5972833.48 N
5972854.09 N
5972874.74 N
5972888.90 N
5972891.32 N
5972884.67 N
700 19' 46.1429" N
700 19' 45.9156" N
700 19' 45.6752" N
700 19' 45.4083" N
700 19' 45.0863" N
700 19' 44.6831" N
700 19' 44.4702" N
700 19' 44.3255" N
700 19' 44.3030" N
700 19' 44.3743" N
700 19' 44.6014" N
700 19' 44.8529" N
70019' 45.1173" N
70019' 45.4110" N
:astings
(ft)
3169.51 W
3151.61 W
3128.88 W
3107.46 W
704804.41 E
704830.44 E
704847.97 E
704859.97 E
704866.64 E
704863.58 E
704854.57 E
704837.08 E
704814.09 E
704791.84 E
704758.17 E
704736.21 E
704721.87 E
704713.39 E
704711 .88 E
704715.52 E
704724.79 E
704742.30 E
704764.97 E
704786.58 E
148020' 19.5062" W
148020' 18.7644" W
148020'18.2719" W
148020'17.9431" W
148020' 17.7744" W
1480 20' 17.8964" W
148020' 18.1768" W
1480 20' 18.6994" W
148020' 19.3727" W
148020'20.0167" W
148020' 20.9817" W
1480 20' 21 .6027" W
148020'22.0001" W
1480 20' 22.2240" W
1>'
~
BPXA
Lisburne PSI (East Dock)
Target Target
Shape Type
~
.~
DrillQuest 2.00.09.006
North Slope Alaska
Target
Name
PSI-10 TD Geo Circle
29 July, 2002 - 9:17
Sperry-Sun Drilling Services
Proposal Report for PSI-1 0 WPS - PSI-10 WP05
Revised: 25 July, 2002
#15
#16
#17
#
Page 11 of 11
Target Entry Coord in
TVD Northings
(ft) (ft}7f
45.7611 ì1ili
1 liJ\i
1 3" N
00 19' 6.2978" N
700 19' 46.3155" N
700 19' 46.2443" N
astings
(ft)
1480 20' 22.2397" W
148020' 22.1171" W
1480 20' 21.8301" W
1480 20' 21.3078" W
148020'20.6442" W
148020' 20.0188" W
6693.99 N 3109.93 W
5972795.14 N 704786.60 E
70019'45.3641" N 148020'20.0897" W
150.00ft
~
..
BPXA
Lisburne PSI (East Dock)
Target Target
Shape Type
,,_,i
Circle
Geological
~
DrillQuest 2.00.09.006
See Mn Jne Azi TVD +N/-S +FJ-W DI-"g TI1ace VSec Target
I 31.40 om 0.00 31.40 o.m o.m 0.00 0.00 0.00
2 34.00 o.m 0.00 34.<Xi 0.00 0.00 o.m o.m om
3 300.00 om 0.00 300.00 o.m 0.00 o.m 0.00 0.00
4 1864.80 23.47 340.00 1821.40 296.98 .108.1)9 150 340.00 314.87
5 2191.87 23.47 340.00 2121.42 419.38 -152.64 0.00 0.00 444.65
6 2620.08 32.()4 340.00 2500.01 6G\S.60 -220.78 2.00 0.00 643.15
3226.35 52.94 334.46 2944.74 980.26 -381.93 3.50 347.71 1049.92
8 9759.86 52.94 334.46 6882.17 568457 -2629.80 0.00 O.!XI 6263.39
9 1\406.91 20,00 334.66 818851 6556.23 -3045.19 2.(XI 179.87 7228.92
10 1\506.91 20.m 334.66 8282.48 6587.14 -3059.82 0.00 O.lX) 7263.12
1\ 1\851.71 20.00 334.66 8606.49 6693.72 -3110.30 0.00 0.00 7381.05
WH.I,DETAII.5
Name +N!-S +FJ-W NlH1hing l~stillg LatituJc Longitude- SIoI
PSIIO 141.60 :J2.1.86 59MI89.89 701!080.81 70" 18'39.532N 148" 18.49.292W N/A
ANTI-COLLISION SETI1NGS
COMPANY DETAILS
BP Amoco
)cptl>Fm Depth To SUlYeylPlan
!lAO HJOO.IXJ Pklnne<!: PSI. 10 WI~J5 VI
100100 11851.71 Pimned:PSl-]()WP05 VI
Interpolation Method:MD Interval: 50,00
Depth Range From: 31.40 To: 11851.71
Maximum Range: 1382.03 Reference: Plan: PSI-IO WP05
Ca1cukitkm Method: Minimum Curvature
Error System: ISCWSA
Sean Method: Trav Cylinder Norlh
EITOT Surface: Elliptical + Casing
Warning Method: RuJcs Based
=l§è
0
-125
-100
''''75
""'''50
./
/
/
"".25
-0
fl:':,:"~}:,:,, i
2701~ ~ . ..:"".: I
¡: ~ "-,:: I
V i, '",\" i
~ l-\-. \ :! .'!<..," .' K"'. ~.:.:;,. I
~ II, - ,." !,".: ':"ffij. .'.. ~~..."
!? ' ' :' "I, "'j ."
. ,.::,. I ~r" '-' ,'"
it '.'" ,~' .' ,::
;;; ",' ~~vl",."", :E=:::;:
~ if' "~ ... .' ,1ft' .'"
!? .o.},t~~l} ~\~I(~j::::"
.f ~'II.Ø:.I~j" ,.. :"~~'
/ cl,'i,":' :,r
~' . r
.~. ~'.:""~'~ <. ','.f",~
.~: ~.~.
2JI t,
~'7>\ 'Ì' -
'Î~\'ð.-¡:'
~'7>\
/
-25
-50
-75
-100
, .
-125
=B2
Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [50ft/in]
.
Sù'RVEY PROGRAM
,I,
..
Tool
WELLP ATH nET AILS
Plan PS/IO
CB-GYRO.SS Rig:
MWI)¡.lf'R.MS Ref. Datum;
V.Section
Anglo
RKß 51.4 @ (RKß 51.4 )
51.4Of1
Origfl
+N/-S
Origin
+Ei-W
StaI1ing
From TVD
335.08°
0.00
From Colour
0
250
500
750
1000
1250
1500
1750
2000
2250
2500
2750
3000
ToMD
250
500
750
1000
1250
1500
1750
2000
2250
2500
2750
3000
12000
LEGEND
- PSI 5 (Plall PSI 5), Major Risk
- PS( 6 (pSI 6), Majc:1r Risk
-- PSI 7 (plan PSI 7). Major Ri~k
- PSI 8 (plan PSI g). Major Risk
- PSI 9 (P'III PSI 9). Major Ri,k
- PSI 9 (Rig: PSI 9), Major Risk
PSI-OI (Plan PS/I), Mapr Risk
- PSI-OI (Rig PSI-Ol MWD+fFR+MS), Major Risk
- L3-0t (1.3-01), Major Risk
- Pbn PSI 10
PS(-({)WP05
.-,/
90
Plan: PSI-IO WP05 (PSIIOIPlan PSI 10)
Created By: Peach HOlt7111a11
Dale:07h.~'
D¡lle: ----
Date:
Checked :
Rcvicw~l:
Approved: --
Da'e:_-
SECTION nET AILS
.
j/J
')
Sperry-Sun
Anticollision Report
Company: BP Amoco
.'ield: Lisburne
Reference Site: East Dock (PSI)
Reference Well: PSI 10
Reference Wellpath: Plan PSI 10
Date: 07/25/2002
Time: 10:42:07
Page:
1
Co-ordinate(NE) Reference:
Vertical (TVD) Reference:
GLOBAL SCAN APPLIED: All wellpaths within 200'+ 10011000 of reference
Interpolation Method: MD Interval: 25.00 ft
Depth Range: 31.40 to 11851.71 ft
Ma.~mum Radius: 1382.03 ft
Reference:
Error Model:
Scan Method:
Error Surface:
Well: PSI 10, True North
RKB51.4 @(RKB51.4)51.4
Db: Oracle
Principal Plan & PLANNED PROGRAM
ISCWSA Ellipse
Trav Cylinder North
Ellipse + Casing
.................-...---.-.---.-
-----.....-.......-...-.----.----
Survey Program for Definitive Wellpath
Date: 08/30/200 1 Validated: No Version: 8
Planned From To Survey Toolcode Tool Name
ft ft
31.40 1001.40 Planned: PSI-10 W P05 V1 CB-GYRO-SS Camera based gyro single shots
1001.40 11819.01 Planned: PSI-10 WP05 V1 MWD MW D - Standard
Ca~ing Points
MD TVD Diameter Hole Size Name
ft ft in in
5947.11 4584.40 13.375 17.500 13 3/8"
11506.83 8282.40 9.625 12.250 95/8"
11819.00 8575.74 7.000 8.500 7"
Summary
<---------------------- Offset Wellpath ----------------------> Reference Offset Ctr-Ctr No-Go Allowable
Site Well Wellpath MD MD Distance Area Deviation Warning
ft ft ft ft ft
East Dock (PSI) PSI 5 Plan PSI 5 V5 Plan: PS 723.84 725.00 151.61 17.12 134.49 Pass: Major Risk
East Dock (PSI) PSI6 PSI6 V14 624.80 625.00 122.06 12.20 109.86 Pass: Major Risk
East Dock (PSI) PSI7 Plan PSI 7 V6 Plan: PS 698.89 700.00 91.87 16.64 75.23 Pass: Major Risk
East Dock (PSI) PSI 8 Plan PSI 8 V12 Plan: P 674.87 675.00 63.10 16.15 46.95 Pass: Major Risk
East Dock (PSI) PSI 9 Plan PSI9 V16 Plan: P 574.58 575.00 31.35 14.25 17.10 Pass: Major Risk
East Dock (PSI) PSI 9 Rig: PSI 9 V2 699.12 700.00 32.40 12.83 19.58 Pass: Major Risk
East Dock (PSI) PSI-01 Plan PSI 1 V7 Plan: PS 847.32 850.00 271.82 18.62 253.21 Pass: Major Risk
East Dock (PSI) PSI-01 Rig PSI-01 MWD+IFR+MS 400.18 400.00 272.78 8.75 264.04 Pass: Major Risk
Lis DS 03 L3-0 1 L3-01 V1 Out of range
Site: East Dock (PSI)
Well: PSI5 Rule Assigned: Major Risk
Wellpath: Plan PSI 5 V5 Plan: PSI 5 wp03 V1 Inter-Site Error: 0.00 ft
Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable
MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing Distance Area Deviation Warning
ft ft ft ft ft ft deg deg in ft ft ft
31.40 31 .40 31.40 31.40 0.00 0.00 251.59 251.59 13.375 150.00 1.29 148.72 Pass
50.00 50.00 50.00 50.00 0.08 0.08 251.59 251.59 13.375 150.00 1.96 148.05 Pass
75.00 75.00 75.00 75.00 0.19 0.13 251.59 251.59 13.375 150.00 2.68 147.33 Pass
100.00 100.00 100.00 100.00 0.30 0.16 251.59 251.59 13.375 150.00 3.36 146.64 Pass
125.00 125.00 125.00 125.00 0.37 0.28 251.59 251.59 13.375 150.00 4.18 145.82 Pass
150.00 150.00 150.00 150.00 0.44 0.37 251.59 251.59 13.375 150.00 4.90 145.10 Pass
175.00 175.00 175.00 175.00 0.51 0.44 251.59 251.59 13.375 150.00 5.56 144.44 Pass
200.00 200.00 200.00 200.00 0.58 0.50 251.59 251.59 13.375 150.00 6.20 143.81 Pass
225.00 225.00 225.00 225.00 0.63 0.56 251.59 251.59 13.375 150.00 6.79 143.21 Pass
250.00 250.00 250.00 250.00 0.68 0.62 251.59 251.59 13.375 150.00 7.37 142.64 Pass
275.00 275.00 275.00 275.00 0.73 0.67 251.59 251.59 13.375 150.00 7.93 142.08 Pass
300.00 300.00 300.00 300.00 0.78 0.72 251.59 251.59 13.375 150.00 8.48 141.53 Pass
325.03 325.03 325.00 325.00 0.83 0.77 251.55 271.55 13.375 150.00 9.02 140.98 Pass
350.05 350.05 350.00 350.00 0.87 0.82 251.46 271.46 13.375 149.99 9.55 140.44 Pass
375.07 375.07 375.00 375.00 0.92 0.86 251.30 271.30 13.375 149.98 10.07 139.91 Pass
400.09 400.07 400.00 400.00 0.96 0.91 251.09 271.09 13.375 149.97 10.59 139.38 Pass
425.09 425.07 425.00 425.00 1.01 0.96 250.80 270.80 13.375 149.96 11.11 138.85 Pass
450.09 450.05 450.00 450.00 1.05 1.00 250.46 270.46 13.375 149.95 11.62 138.33 Pass
475.07 475.01 475.00 475.00 1.09 1.04 250.05 270.05 13.375 149.95 12.13 137.81 Pass
500.03 499.94 500.00 500.00 1.14 1.08 249.58 269.58 13.375 149.95 12.64 137.31 Pass
524.98 524.85 525.00 525.00 1.18 1.13 249.05 269.05 13.375 149.97 13.15 136.82 Pass
--..------------- ------'------
.':'"
JfI
')
Sperry-Sun
Anticollision Report
)
ç~mpIÚlY:
Field:
Ref~renceSite:
RefèrenceWeD:
R.~fëi~nce.WëU'pdh:
BP AmOco
lisburnè
East Dopk{PSI)
PSIJO '
PlanPS'.10
D~te;. ..07/29/2002
Tilne: ......12:42:19
NO GLOBAL SCAN: Using user defmed selection & scan criteria
Interpolation Method: MD Interval: 50.00 ft
Depth Range: 31.40 to 11851.71 ft
Maximum Radius: 1382.03 ft
Reference:
Error Model:
Scan Method:
Error Surface:
yvell:pSIJP,rrÜe t-Jortn
RKB5L4@(RKB 5104)51 A
. Dh:
Plan: PSI-10 WP05 & NOT PLANNED PROGRA
ISCWSA Ellipse
Trav Cylinder North
Ellipse + Casing
Co-ordina~e(NE)Referenc~:
Vettic~ (TVI>J Referelice:
Casing Points
DiäJneter
in
5947.09 4584.40
11506.82 8282.40
11819.00 8575.75
13.375
9.62!;>
7.000
17.500
12.250
8.500
13 3/8"
95/8"
7"
Plan:
PSI-10WP05
Date Composed:
Version:
Tied-to:
07/24/2002
1
From Well Ref. Point
Principal: Yes
Summary
Reference offset Ctr~Ctr No~GO AUowable
MD MD Dištan(:e.. Area Ðcviation
ft ft ft ft ft
East Dock (PSI) PSI5 Plan PSI 5 V5 Plan: PS 748.61 750.00 152. 15 17.62 134.53 Pass: Major Risk
East Dock (PSI) PSI6 PSI6 V14 599.87 600.00 121.61 11.74 109.88 Pass: Major Risk
East Dock (PSI) PSI7 Plan PSI 7 V6 Plan: PS 698.89 700.00 91.87 16.64 75.23 Pass: Major Risk
East Dock (PSI) PSI8 Plan PSI 8 V12 Plan: P 699.83 700.00 63.62 16.66 46.96 Pass: Major Risk
East Dock (PSI) PSI9 Plan PSI 9 V16 Plan: P 549.69 550.00 30.89 13.78 17.11 Pass: Major Risk
East Dock (PSI) PSI9 Rig: PSI 9 V2 699.12 700.00 32.40 12.83 19.58 Pass: Major Risk
East Dock (PSI) PSI-01 Plan PSI1 V7 Plan: PS 847.32 850.00 271.82 18.62 253.21 Pass: Major Risk
East Dock (PSI) PSI-01 Rig PSI-01 MWD+IFR+MS 400.18 400.00 272.78 8.75 264.04 Pass: Major Risk
EX EBAYST-01 EBAYST-01 EBAYST-01 V4 597.42 600.00 355.87 14.70 341.17 Pass: Major Risk
Lis DS 03 L3-01 L3-01 V1 Out of range
Site: East Dock (PSI)
Well: PSI5 Rule Assigned: Major Risk
Wellpath: Plan PSI 5 V5 Plan: PSI 5 wp03 V1 Inter-Site Error: 0.00 ft
Reference Offset SeÏni-Major AxiS Cti-Ctr No~GO AUowable
MD TVD MD TVD Ref Offset TFO+i\ZITFP'HS ..Casing Distance ..Area Deviätion
ft ft ft ft ft ft, deg deg in ft ft ft
31.40 31.40 31.40 31.40 0.00 0.00 251.59 251.59 13.375 150.00 1.29 148.72 Pass
SO.OO 50.00 50.00 50.00 0.08 0.08 251.59 251.59 13.375 150.00 1.96 148.05 Pass
100.00 100.00 100.00 100.00 0.30 0.16 251.59 251.59 13.375 150.00 3.36 146.64 Pass
150.00 150.00 150.00 150.00 0.44 0.37 251.59 251.59 13.375 150.00 4.90 145.10 Pass
200.00 200.00 200.00 200.00 0.58 0.50 251.59 251.59 13.375 150.00 6.20 143.81 Pass
250.00 250.00 250.00 250.00 0.68 0.62 251.59 251.59 13.375 150.00 7.37 142.64 Pass
300.00 300.00 300.00 300.00 0.78 0.72 251.59 251.59 13.375 150.00 8.48 141.53 Pass
350.05 350.05 350.00 350.00 0.87 0.82 251.46 271.46 13.375 149.99 9.55 140.44 Pass
400.09 400.07 400.00 400.00 0.96 0.91 251.09 271.09 13.375 149.97 10.59 139.38 Pass
450.09 450.05 450.00 450.00 1.05 1.00 250.46 270.46 13.375 149.95 11.62 138.33 Pass
500.03 499.94 500.00 500.00 1.14 1.08 249.58 269.58 13.375 149.95 12.64 137.31 Pass
549.91 549.74 550.00 550.00 1.22 1.17 248.46 268.46 13.375 150.00 13.66 136.34 Pass
599.71 599.40 600.00 600.00 1.31 1.25 247.09 267.09 13.375 150.14 14.66 135.48 Pass
649.42 648.93 650.00 650.00 1.40 1.33 245.55 265.55 13.375 150.49 15.64 134.84 Pass
699.05 698.33 700.00 700.00 1.49 1.39 243.93 263.93 13.375 151.15 16.62 134.53 Pass
748.61 747.58 750.00 749.98 1.59 1.47 242.24 262.24 13.375 152.15 17.62 134.53 Pass
798.07 796.66 800.00 799.96 1.69 1.53 240.49 260.49 13.375 153.50 18.62 134.88 Pass
847.45 845.58 850.00 849.92 1.80 1.61 238.70 258.70 13.375 155.22 19.67 135.56 Pass
896.73 894.30 900.00 899.86 1.91 1.68 236.87 256.87 13.375 157.32 20.71 136.63 Pass
945.91 942.84 950.00 949.78 1.97 1.75 235.03 255.03 13.375 159.82 21.61 138.24 Pass
994.99 991.16 1000.00 999.68 2.03 1.83 233.18 253.18 13.375 162.73 22.49 140.28 Pass
1043.97 1039.28 1050.00 1049.53 2.04 1.86 231.41 251.41 13.375 166.07 23.12 143.01 Pass
1092.89 1087.21 1100.00 1099.30 2.05 1.90 229.80 249.80 13.375 169.85 23.73 146.20 Pass
1141.74 1134.94 1150.00 1148.98 2.06 1.91 228.35 248.35 13.375 174.05 24.29 149.85 Pass
'¥
~~r-28-2002 07:22
)
;/ . /,~«:~~:.;':....:
PRUDHOE BAY.. >:./.,/ ..,.,....,.....:::~'~'",...,." ~
b
('\¡
c
ëi
(j
.,'
T-768 P.002/002 F-834
) R U [HJ 0 Ii BAY EAST ~;,h /"..,.,.. ',.."
...., ,...".~
..- -- EASì"Põëî<. - ,.:7;
. " I
--£{)f. ,":' ,.Q W ~
PROJECT ' ~:~ ¡ , r " '¡:p PI)D
~ ':''-'I:'~ '.'~ /
AAEAA'" 'ŠT'QRG.f<\j"'.', /'
\ Sf PtO ' .~. .'
. ~ :.; , /'. .", ~.. 1. ~~
,¿'\ 't \ ' '; . ..'~,~ 'i "l~~ .
'--:"::::~~ ';':;.. \ ",.r.:~' }; " .
~a::~I;:'\("'-~:' -;-. ,;.~
. :~,~1~:~:'~~~:~!;:~\:;? . ~~,y~
(SOUT~ BAY ~~j~. , )¡' \~~
From-MCC WING 6
+907-659-5065
a
.'
z
<
~~
.,.~-
I
.0" ..-."
VICINITY MAP
N.T.S,
(.!)
;;2:
F
c,I)
X
u..J
I
Vi
CL
-+-
IJ") <.0 " ex) 01 0
1 I I I I I
ü1 û) U1 (/) (7) fJJ
CL 0.. 0... a.. CL Q..
-+--+--+--+--+--+-
-I
...J
~
.
EAST DOCK
WEST PAD
..'
,....../"'" " ,...." ...,...,..,... " .
.LEGEND
-+- AS-STAKED CONOUCTOR
. EXISTtNG CONDUCTOR
~
~
-t
~
'/
¡::---.
~ ~~., /O~ ISSUED fO~ J~i'O~IoAA 11 ON
::: N~ {\..1f
LOCATED WITHIN PROTRACTED- SEC. 15, T: 11 N" R. 1 ~- E.. UMtA T MERIDIAN, ALA~t<A
WE:tL A.S.P. _. PLANT' GEODE1'¡C GEÖDETIC APPROX. SECrlON
NO. COORDINATES 4COORDINA TES POSITION(DMS) POSITI?N(D.DD) GND: ELEV. OFFSE}"S
Y=5,966,.097,55 N;:::10.000.00 70.18'38.693" 70.3107481. 3,800' FSL
PSI-1 X;::: 707,827.10 E= 4,910.00 148"18'56.76~" 148.315?6~1' 17.6'.. ..4..579' FEL
y= 5,966.138.59 N='\O,OOO.OO 70.18'39.066" 70.310851 T ~,8:S8' FSL
PSI-5 x= 707.939.86 E= 5.030.00 - 148'18'5;3,444" 148.3148456" 17,5' 4,465' FEL
PS 6 Y= 5.966,148.85 N=10,OOO.00 70.18'39,159" 70.3108775' 17 5' 3.848' FSL
t- X~=:; 707.968..°5 E~ 5,060.00 148'18'52.613". .14B.314614T. . 1J4;36' FEL
y= 5,966,' 59.11 N=10.000.00 70"18'39.253" 70..3109036. 3,857' FSL
PSI-7 x= 707,996.~4 E= 51.990.00 148J8'51.783~..- 148.3143842" 17.4' ¿.,408' fEL
.Y~5,966,169.~7 .N=10,OOO.00 70"18'39.346" 70.3109294. 3,867' FSL
P$I-8 x= 708,024.43 E= 5.120.00 148~'8'=!O.953" 1 ~S.3141536" ". ' 7.4' 4,;5?9' FEL
PS 9 y= 5,966,179.63 N;;;10,OOO,OO 70'18'39,439" 70.3109553. 17 3' 3,876' FSl.
1- x= 7.°8.052.62 ,E= 5.150.00 148"8:5.0.123" '4~,3'39231. . 4,3!?1' FEL
y= 5,966,189,89 N=10,OOO.OO 70'18'39.532" 70.3109811* 17.4' 3.886' FSL
PS!-'O x= 708.080.81 E~. 5,180.00 148"18'49,292" 148.31~~9Z2" 4.322' FE.L
F. ~Óbel\. . (JRAM-I' JACOBS O.
1- --r- . CI11:CKEb: ~SOro.!..~ bp
1 ]-' . ~ ::~~,"ê//27/02. -.
- ~ FR802 EO 01-00 T
~~~j~ :: 'f:-$~:~EODgg~D~TC~:~
'111,"(" 'M'''''.-';;;;:-- 1"m .00' WELLS PSt-l, 5, 6. 7. 8, 9 & 10
~~ ""',f¡¡~ ~IU .
!;Mcn:
".,
Q
,::.
rL,
;g
~
rL,
;;,
ã
~
b
~
CJ
..
a
1:;
ù
':;:
...
L.J
Q
Q
o.
L.J
~
f
~
::::
f~
~
.:t
15
ç¡
1 OF 1
..
FcEVlSlCN
J.J RFI'.
.. OY CHK
DATE
CHECK NO.
H 207005
7/12/02
VENDOR
H20700S
DATE
GROSS
DISCOUNT
NET
INVOICE I CREDIT MEMO
DESCRIPTION
7/12/02
INV# CK071002E
PERMIT TO DRILL FEE
RECEIVED
H II "\ 1 ?f{¡?
\.,,)V~- v , ...,\ ",,-,
AJaslca 011 & Gas Cons. LomnHssion
t\m~hora~Je
?SI-}o
THE ATIACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE.
TOTAL ...
PAY
COMMISSION
333 W 7TH
ANCHORAGE, AI<.
~~;::~~'~~~~:~~.~:f::~~.:~~.~~~~.~::::~.;~.:::i:\\~.:~
.:.:..:.:~:.. ...r.'.."í:..-~:''''''::',,,,~:,,,,,
-:-.",-:. "...'...,-.... ..e.- .". '...,'.
¡~!::~;:.: :;~.::\ .. A::\¡;A¡ :;;:{:i:~::::;Ù:i:7:1
III 2 0 ? 0 0 5 III I: 0... ~ 2 0 :I a q 5 I: 0 0 B ... ... ~ q III
H
~'
~.,
1.
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERlP ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME /ð>é1 ,!/SI-/o
PTD# 202- -/.çr
CHECK WHAT
APPLIES
ADD-ONS
(OPTIONS)
MULTI
LATERAL
(If API number
last two (2) digits
are between 60-69)
PILOT
(PH)
HOLE
SPACING
EXCEPTION
DRY DITCH
SAMPLE
Rev: 07/10/02
C\j ody\templates
"CLUE"
The permit is for a new wellbore segment of
existing well
Permit No, API No.
Production should continue to be reported as
a function. of the original API number stated
above.
In accordance with 20 AAC 25.005(f), all
records, data and logs acquired for the pilot
hole must be clearly differentiated in both
name (name on permit plus PH)
and API number (50
70/80) from records, data and logs acquired
for well (name on permit).
The permit is approved subject to full
compliance with 20 AAC 25.055. Approval to
perforate and produce is contingent upon
issuance of a conservation order approving a
spacing exception.
(Company Name) assumes the liability of any
protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the
Commission must be in no greater than 30'
sample intervals from below the permafrost
or from where samples are first caught and
10' sample intervals through target zones.
,WELL PERMIT CHECKLIST COMPANY ß/J)( WELL NAME hú /5/~)0 PROGRAM: Exp - Dev - Redrll - Re-Enter - Serv ~ Wellbore seg -
FIELD & POOL h 7'~.;: ç- /1' INIT CLASS 1-,. .v/f GEOL AREA? ., n UNIT# // C- (0 ON/OFF SHORE ~.v
ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . ~ N
2. Lease number appropriate. . . . . . . . . . . . . . . . . . . Y N
3. Unique welt name and number. . . . . . . . . . . . . . . . . Y N
4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y N
5. Well located proper distance from drilling unit boundary. . . . Y N
6. Well located proper distance from other wells.. . . . . . . . . Y N
7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N
8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . Y N
9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N
10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N
11. Permit can be issued without conservation order. . . . . . . . Y N
12. Permit can be issued without administrative approval.. . . . . Y N
(Service Well Only) 1.3. Well locate.d w/in area & strata àuthorized by injection order #$- \.Ÿi ,N
(Service Well Only) 14. All wells wlin ~ mile area of review identified. . . . . . . . .. WN
ENGINEERING 15. Conductor string provided. . . . . . . . . . . . . . . . . . . ~~ N
16. Surface casing protects all known USDWs. . . . . . . . . . . N
17. CMT vol adequate to circulate on conductor & surf csg. . . . . .. N-
18. CMT vol adequate to tie-in long string to surf csg. . . . . . . . ~
~~: g~s~n~i~~~i~~Sa~~~~ou:~eP:~rd~~~~~ h~~:~~~fr~~t.' : : : : : : ~ ~ . f
21. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . 4?N tJtt.t>PrS ¿ 7 E
22. If a re-drill, has a 10-403 for abandonment been approved. . . Y N ,." IA;-
23. Adequate wellbore separation proposed.. . . . . . . . . . . . iN
24. If diverter required, does it meet regulations. . . . . . . . . . . N
25. Drilling fluid program schematic & equip list adequate. . . . . N fJ1~ /Ill {¡.j / (). ~ ppc¡.
26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . . N .A.. P 4
27.. BOPE press ratingappropriate;.testto '/000 psig. ~N 'v~~ ]O~ fSl.
28. Choke manifold complies w/API RP-53 (May 84). . . . . . . . N
29. Work will occur without operation shutdown. . . . . . . . . . . . N
30. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . Y llP
31. Mechanical condition of wells within AOR verified. . . . . . . . Y N I ~ 7 - 1 ~ 7) I i ~ - 0' ~
32. Permit can be issued w/o hydrogen sulfide measures. . . . . éfj N
33. Data presented on potential overpressure zones. . . . . . . . ;rY: N~---- /. ¿ i, ./1.1
34. Seismic analysis of shallow gas zones. . . . . . . . . . . . . /Vj itl
35. Seabed condition survey (if off-shore). . . . . . . . . . . . . .
36. Contact name/phone for weekly progress reports. . . . . . . .
GEOLOGY: PETROLEUM ENGINEERING: RESERVOIR ENGINEERING UIC ENGINEER
RP~ TEM JDH ~ JBR
'APPR DATE
~~2-
APPR DATE
VJ&\- .g/,(o~
(Service Well Only)
GEOLOGY
APPR DATE
/k ~h?
(Exploratory Only)
Rev: 07/12/02
SFD-
WGA \;JGA-
MJW
G:\geology\perm its\checklist.doc
Ll~F w;.t-j ~ ph7d /JI~ft/~. Ckf ~ k~fæv> oK.
Ì-q £ ~ o'f ~ j -7 (Jh7d. ~t ~ fL-<~/fùC OK.
).
COMMISSIONER:
COT
DTS O~{ 0 7/rÞ ~
Comments/Instructions:
)
)
Well History File
APPENDIX
Infonnation of detailed nature that is not
particularly gennane to the Well Pennitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplrfy finding infonnation, infonnation of this
nature is accumulated at the end of the file under APPEN.DIX.
No special. effort has been made to chronologically
organize this category of infonnation.
.'
Sperry-Sun Drilling Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Wed Mar 19 13:54:12 2003
Reel Header
Service name.............LISTPE
Date. . . . . . . . . . . . . . . . . . . . .03/03/19
Origin. . . . . . . . . . .. . . . . . . . STS
Reel Name - . - . . . . - - . . . . - - . UNKNOWN
Continuation Number......01
Previous Reel Name.......UNKNOWN
Comments.................STS LIS
Tape Header
Service name.............LISTPE
Date.....................03/03/19
Origin...................STS
Tape Name................UNKNOWN
Continuation Number......Ol
Previous Tape Name.......UNKNOWN
Comments. . . . . . . . . . . . . . . . . STS LIS
Physical EOF
Comment Record
TAPE HEADER
Prudhoe Bay Unit
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
AKMW22135
T. GALVIN
D. FERGUSON
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 4
AK!vlW22135
P. ROGER
D. FERGUSON
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE
BIT SIZE (IN)
16.000
12.250
8.500
#
REMARKS:
"
Writing Library. Scientific Technical Services
Writing Library. Scientific Technical Services
PSI-10
500292311000
BP Exploration
Sperry Sun
19-Jv1AR-03
(Alaska) Inc.
MWD RUN 2
AKMW22135
T. GALVIN
D. FERGUSON
MWD RUN 3
AKMW22135
P. SMITH
D. FERGUSON
MWD RUN 5
AKMW22135
P. ROGER
W. DECKER
15
11N
15E
1394
957
.00
50.45
17.20
CASING
SIZE (IN)
20.000
13.375
9.625
DRILLERS
DEPTH (FT)
111. 0
6067.0
11434.0
~œ-J59
11~1Lj
)
./
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. Ì"IWD RUNS 1-2 COHPRISED DIRECTIONAL AND DUAL GAMJVIA
RAY (DGR), UTILIZING GEIGER-MUELLER TUBE DETECTORS.
4. MWD RUNS 3-4 COMPRISED DIRECTIONAL WITH DGR;
ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4);
AND PRESSURE WHILE DRILLING (PWD).
5. MWD RUN 5 COMPRISED DIRECTIONAL WITH DGR; EWR4;
COMPENSATED NEUTRON POROSITY (CNP); AND STABILIZED
LITHO-DENSITY (SLD).
6.
LOG AND MERGED DIGITAL DATA (LDWG) ONLY WERE SHIFTED
TO A SCHLUMBERGER CASED-HOLE GAMMA RAY LOG RUN IN
PSI-I0 ON 28 AUGUST 2002. LOG HEADER DATA RETAIN ORIGINAL
DEPTH REFERENCES. THESE PDC LOG DATA WERE PROVIDED BY
DEWAYNE SCHNORR ON 12 NOVEMBER 2002.
7. MWD RUNS 1 - 5 REPRESENT WELL PS1-10 WITH API#:
50-029-23110-00. THIS WELL REACHED A TOTAL DEPTH (TD)
OF 11809'MD I 8594'TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLO\~
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SPSF = SMOOTHED NEUTRON POROSITY (SANDSTONE MATRIX,
FIXED HOLE SIZE)-
SNFA = SMOOTHED AVERl.l,.GE OF FAR DETECTOR'S COUNT RATE.
SNNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE.
SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT BIN).
SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN).
SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR (LOW-COUNT BIN).
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
PARAMETERS USED IN POROSITY LOG PROCESSING:
HOLE SIZE: 8.50"
MUD WEIGHT: 9.0 PPG
MUD SALINITY: 15,500 PPM CHLORIDES
FORMATION WATER SALINITY: 50,000 PPM CHLORIDES
FLUID DENSITY: 1.0 GICC
MATRIX DENSITY: 2.65 GICC
LITHOLOGY: SANDSTONE
$
File Header
Service name.............STSLIB.OOl
Service Sub Level Name...
Version Number...........1. 0.0
Date of Generation.......03/03/19
Maximum Physical Record..65535
File Type................ LO
Previous File Name.......STSLIB.OOO
Comment Record
FILE HEll"DER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted and
DEPTH INCREMENT:
#
FILE SUMM.1\RY
1
clipped curves; all bit runs merged.
.5000
PBU TOOL CODE
GR
ROP
FET
RPX
RPS
RPM
RPD
PEF
NPHI
FCNT
NCNT
DRHO
RHOB
$
)
START DEPTH
112.0
112.0
5964.0
5964.0
5964.0
5964.0
5964.0
11202.0
11203.0
11203.0
11203.0
11426.0
11426.0
)
STOP DEPTH
11771.5
11807.5
11764.5
11764.5
11764.5
11764.5
11764.5
11740.0
11731.5
11732.0
11 732.0
11740.0
11740.0
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE
112.0
10962.0
10963.5
10966.5
10968.0
10973.0
10982.0
10984.0
10988.5
10991.5
10995.5
10997.0
10999.5
11003.5
11007.5
11011.0
11014. 0
11015.5
11017.0
11020.5
11024.0
11028.0
11032.0
11035.0
11038.0
11040.0
11043.0
11045.0
11046.5
11048.5
11055.0
11057.5
11062.5
11065.0
11068.0
11 070.0
11074.5
11082.5
11084.5
11085.5
11087.0
11090.0
11092.0
11093.5
11098.0
11101.5
11103.5
11108.5
11115.0
11116.5
11119.5
11124.5
11128.0
11130.5
11135.5
DEPTH
GR
111. 5
10961.5
10963.5
10965.0
10966.0
10973.0
10982.0
10983.0
10988.0
10992.0
10995.0
10997.0
10998.5
11004.0
11006.5
11008.5
11011.5
11015.5
11016.5
11020.5
11024.0
11028.0
11031. 0
11033.5
11037.0
11039.0
11042.0
11044.5
11045.5
11048.0
11053.5
11057.0
11061. 0
11064.0
11066.5
11068.5
11073.0
11080.0
11083.5
11085.0
11087.5
11090.5
11092.5
11095.0
11097.5
11101.0
11103.0
11106.5
11114.5
11116.5
11118.5
11124.5
11126.0
11128.5
11134.5
)
)
11139.5
11143.5
11152.5
11154.5
11156.5
11158.5
11160.0
11162.0
11164.0
11165.0
11166.5
11171.5
11174.0
11175.5
11180.5
11185.5
11188.0
11191. 0
11193.0
11194.5
11196.0
11199.5
11200.5
11202.0
11203.0
11205.0
11205.5
11208.0
11210.5
11213.5
11216.5
11218.0
11220.5
11224.0
11229.5
11232.0
11237.5
11239.5
11240.5
11247.5
11248.5
11255.0
11265.0
11266.5
11268.5
11271. 0
11274.5
11277.0
11279.5
11282.0
11283.5
11285.5
11289.5
11292.5
11295.5
11297.0
11299.5
11301.0
11303.0
11306.0
11308.5
11310.0
11311.0
11312.0
11313.5
11315.0
11323.0
11325.5
11329.5
11333.0
11336.0
11343.0
11348.0
11350.5
11354.0
11137.5
11142.0
11149.5
11151.0
11154.0
11157.0
11158.5
11159.5
11160.5
11162.5
11165.0
11170.0
11173.0
11175.0
11176.5
11182.0
11187.0
11189.5
11191. 5
11192.5
11193.5
11198.5
11200.0
11201.0
11204.0
11205.5
11207.0
11208.0
11210.5
11212.0
11215.0
11216.0
11218.0
11221.5
11227.5
11230.0
11233.0
11234.5
11236.0
11244.5
11247.0
11253.0
11260.5
11262.0
11266.5
11269.0
11272.5
11275.0
11278.0
11280.0
11281.0
11285.0
11288.0
11292.0
11294.0
11295.0
11298.0
11300.0
11302.0
11305.0
11307.5
11309.5
11311.5
11313.0
11315.0
11316.5
11320.0
11322.5
11327.0
11330.0
11333.5
11340.0
11346.5
11348.0
11350.5
11358.0
11359.5
11360.5
11363.0
11365.5
11367.5
11373.5
11376.0
11379.0
11381.0
11384.0
11385.5
11389.0
11393.0
11395.0
11396.5
11398.5
11404.0
11410.5
11412.5
11416.5
11420.5
11424.0
11426.0
11435.0
11445.5
11449.0
11452.0
11454.5
11456.5
11462.5
11464.5
11467.5
11471.0
11473.0
11475.0
11477 . 5
11479.5
11483.0
11490.0
11491.5
11495.5
11498.5
11500.5
11505.5
11525.0
11526.5
11528.0
11529.5
11531. 5
11545.5
11549.5
11551.0
11553.5
11556.0
11560.0
11561.5
11562.5
11565.5
11569.5
11583.0
11587.5
11589.0
11593.5
11596.5
11599.0
11601.5
11603.0
11604.5
11608.0
11614.0
11616.0
11617.5
11621.0
11624.5
)
)
11353.5
11355.0
11357.0
11361. 0
11364.0
11366.0
11371. 5
11374.0
11376.5
11379.5
11382.0
11384.5
11387.0
11391.5
11393.5
11394.5
11398.0
11402.0
11407.0
11412.5
11417.5
11423.0
11426.0
11428.0
11437.5
11448.5
11452.0
11454.5
11456.0
11458.5
11464.5
11467.0
11469.5
11474.0
11475.0
11477.0
11479.5
11482.0
11484.5
11491. 5
11493.5
11497.5
11500.5
11503.0
11507.5
11527.5
11529.0
11530.0
11531. 5
11533.5
11547.5
11551. 0
11552.5
11556.0
11559.0
11562.5
11564.0
11565.0
11568.0
11572.0
11585.5
11590.0
11592.0
11596.5
11599.0
11601.0
11604.5
11608.5
11609.5
11610.5
11613.0
11615.0
11616.5
11620.5
11623.5
')
11625.5
11633.0
11642.0
11646.0
11648.0
11649.0
11650.5
11654.0
11656.5
11660.5
11667.5
11670.0
11674.0
11674.5
11678.0
11682.0
11683.0
11684.0
11686.5
11696.0
11697.5
11704.5
11712.5
11715.0
11717.0
11723.0
11725.5
11730.5
11731. 5
11736.0
11737.0
11739.0
11742.0
11745.5
11755.0
11 7 62.5
11763.5
11767.0
11808.5
$
11625.0
11632.5
11641.5
11645.5
11647.5
11649.0
11650.5
11653.5
11656.0
11660.0
11666.5
11670.0
11673.5
11674.5
11678.5
11681.5
11683.0
11684.5
11686.5
11696.0
11698.0
11 705.5
11714.0
11715.5
11718.5
11723.0
11726.5
11731.0
11 7 32.0
11736.5
11738.0
11739.5
11743.5
11746.0
11756.0
11761.0
11763.0
11 767 . 5
11809.0
#
MERGED
PBU
MWD
MWD
MWD
MWD
MWD
$
DATA SOURCE
TOOL CODE
BIT RUN NO
1
2
3
4
5
MERGE TOP
80.5
865.5
5963.5
9920.5
11200.5
MERGE BASE
916.5
6077.0
9973.0
11442.0
11808.0
#
REMARKS:
MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units........ ...Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value...................... -999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHM1v! 4 1 68 16 5
RPM MYIilD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
NPHI MWD PU-S 4 1 68 32 9
)
FCNT MWD CNTS 4 1 68 36 10
NCNT MWD CNTS 4 1 68 40 11
RHOB MWD G/CM 4 1 68 44 12
DRHO MWD G/CM 4 1 68 48 13
PEF MWD BARN 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 112 11807..5 5959.75 23392 112 11807.5
ROP MWD FT/H 0.59 777.1 197.911 23392 112 11807.5
GR MWD API 15.02 343.95 69.5867 23320 112 11771.5
RPX ~'ÌfD OHMM 0.21 976.7 4.05746 11602 5964 11764.5
RPS MWD OHMM 0.22 1035.81 4.83091 11602 5964 11764.5
RPM MíND OHMM 0.34 1046.92 5.79344 11602 5964 11764.5
RPD MWD OHMM 0.77 2000 13.6012 11602 5964 11764.5
FET MWD HOUR 0.11 80.39 3.31083 11602 5964 11764.5
NPHI MWD PU-S 12.2 81. 63 44.2381 1058 11203 11731. 5
FCNT MWD CNTS 405 1240 667.666 1059 11203 11 7 32
NCNT MWD CNTS 2202 3937 2792.23 1059 11203 11732
RHOB MWD G/CM 1.941 2.99 2.34773 629 11426 11740
DRHO MWD G/CM -0.121 0.707 0.0534849 629 11426 11740
PEF MWD BARN 1. 02 15.12 6.4957 1077 11202 11740
First Reading For Entire File..........112
Last Reading For Entire File...........11807.5
File Trailer
Service name.............STSLIB.001
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......03/03/19
Maximum Physical Record..65535
File Type................ LO
Next File Name...........STSLIB.002
Physical EOF
File Header
Service name.............STSLIB.002
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......03/03/19
Maximum Physical Record..65535
Fi Ie Type................ LO
Previous File Name.......STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
2
header data for each bit run in separate files.
1
.5000
START DEPTH
80.5
111. 5
STOP DEPTH
865.0
916.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TO DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
11-AUG-02
Insite
66.37
Memory
917.0
112.0
917.0
)
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction................ . Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing..................... 60 .1IN
Max frames per record.............Undefined
Absent value.. ......, .......... .. .-999
Depth Units........ .. .. .. . . . . .. . . .
Datum Specification Block sub-type...O
.0
3.8
TOOL NUMBER
142827
16.000
.0
SPUD MUD
8.80
300.0
9.2
400
15.2
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DE PT FT 4 1 68 0 1
ROP MWD010 FT/H 4 1 68 4 2
GR MWD010 API 4 1 68 8 3
')
.0
66.0
.0
.0
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 80.5 916.5 498.5 1673 80.5 916.5
ROP MWD010 FT/H 2.04 492.56 175.17 1611 111. 5 916.5
GR MWD010 API 16.96 70.87 34.59 1570 80.5 865
First Reading For Entire File..........80.5
Last Reading For Entire File...........916.5
File Trailer
Service name.............STSLIB.OO2
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......03/03/19
Maximum Physical Record..65535
Fil e Type................ LO
Next File Name...........STSLIB.003
Physical EOF
File Header
Service name.............STSLIB.003
Service Sub Level Name...
Version Number-......... .1.0.0
Date of Generation.......03/03/19
Maximum Physical Record..65535
Fi 1 e Type................ LO
Previous File Name.......STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
ROP
$
3
)
header data for each bit run in separate files.
2
.5000
START DEPTH
865.5
917.0
STOP DEPTH
6025.5
6077.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
15-AUG-02
Insite
66.37
Memory
6077.0
917.0
6077.0
7.2
54.7
TOOL NUMBER
142827
16.000
.0
SPUD MUD
8.90
137.0
8.6
1400
8.2
.000
.000
.000
.000
.0
111.0
.0
.0
)
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing..................... 60 .1IN
Max frames per record.............Undefined
Absent value..................... .-999
Depth Units.......................
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DE PT FT 4 1 68 0 1
ROP MWD020 FT /H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 865.5 6077 3471.25 10424 865.5 6077
ROP MWD020 FT/H 1.28 637.14 228.157 10321 917 6077
GR MWD020 API 15.02 109.53 55.4916 10321 865.5 6025.5
First Reading For Entire File..........865.5
Last Reading For Entire File...........6077
File Trailer
Service name.............STSLIB.003
Service Sub Level Name...
Version Number........... 1. 0.0
Date of Generation.......03/03/19
Maximum Physical Record..65535
Fi 1 e Type................ LO
Next File Name...........STSLIB.004
Physical EOF
File Header
Service name.............STSLIB.004
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation.......03/03/19
Maximum Physical Record..65535
File Type......... ...... .LO
Previous File Name.......STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPS
FET
RPD
RPX
RPM
GR
ROP
$
4
header data for each bit run in separate files.
3
.5000
START DEPTH
5963.5
5963.5
5963.5
5963.5
5963.5
5971.5
6077.5
STOP DEPTH
9920.0
9920.0
9920.0
9920.0
9920.0
9928.0
9973.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
21-AUG-02
')
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMJvIA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) }\T TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value..................... .-999
Depth Units.............. . . . . . . . . .
Datum Specification Block sub-type...O
)
Insite
66.37
Memory
9973.0
6077.0
9973.0
49.9
55.0
TOOL NUMBER
66093
81797
12.250
6067.0
LSND
9.55
44.0
8.5
1400
4.4
2.200
1. 230
2.200
2.400
70.0
131. 0
70.0
70.0
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 5963.5 9973 7968.25 8020 5963.5 9973
ROP MWD030 FT/H 0.89 777.1 196.873 7792 6077.5 9973
GR MWD030 API 19.11 134.4 68.4448 7914 5971. 5 9928
RPX MWD030 OHMM 0.91 503.67 3.19726 7914 5963.5 9920
)
RPS MWD030 OHMM
RPM MWD030 OHMM
RPD MWD030 OHMM
FET MWD030 HOUR
0.85
0.78
0.82
0.11
297.82
532.93
1691.58
80.39
3.29925 7914
3.68391 7914
6.31123 7914
3.12033 7914
5963.5
5963.5
5963.5
5963.5
9920
9920
9920
9920
First Reading For Entire File..........5963.5
Last Reading For Entire File...........9973
File Trailer
Service name.............STSLIB.004
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......03/03/19
Maximum Physical Record..65535
Fi 1 e Type................ LO
Next File Name...........STSLIB.005
Physical EOF
File Header
Service name...-.........STSLIB.005
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......03/03/19
Maximum Physical Record..65535
File Type. .... .. . . . . . . . . . LO
Previous File Name.......STSLIB.004
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
FET
RPD
RPM
RPS
RPX
GR
ROP
$
5
header data for each bit run in separate files.
4
.5000
START DEPTH
9920.5
9920.5
9920.5
9920.5
9920.5
9928.5
9973.5
STOP DEPTH
11389.0
11389.0
11389.0
11389.0
11389.0
11396.5
11442.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
23-AUG-02
Insite
66.37
Memory
11442.0
9973.0
11442.0
18.7
46.1
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
TOOL NUMBER
66093
81797
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
12.250
6067.0
#
)
')
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OH~!) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
LSND
10.60
48.0
9.3
1500
3.0
2.200
1.150
1.850
2.900
70.0
140.0
70.0
70.0
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.................. 0
Data Specification Block Type.....O
Logging Direction................. Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing. ... . ... . . .. . . .. . . . . .60 .1IN
Max frames per record.............Undefined
Absent value........ """""'" .-999
Depth Units.....................~.
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FT/H 4 1 68 4 2
GR l--1WD040 API 4 1 68 8 3
RPX MWD040 OHMM 4 1 68 12 4
RPS HWD040 OHMM 4 1 68 16 5
RPM MWD040 OHMM 4 1 68 20 6
RPD MWD040 OHMM 4 1 68 24 7
FET MWD040 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 9920.5 11442 10681.3 3044 9920.5 11442
ROP MWD040 FT/H 0.59 352.09 133.892 2938 9973.5 11442
GR MWD040 API 60.37 267.65 132.503 2937 9928.5 11396.5
RPX MWD040 OHMM 1. 24 24.77 3.1236 2938 9920.5 11389
RPS MWD040 OHMM 1.27 34.09 3.29447 2938 9920.5 11389
RPM MWD040 OHMM 1. 35 29.12 3.30609 2938 9920.5 11389
RPD MWD040 OHMM 1. 37 23.65 3.39144 2938 9920.5 11389
FET MWD040 HOUR 0.23 22.27 1.93213 2938 9920.5 11389
First Reading For Entire File..........9920.5
Last Reading For Entire File...........11442
File Trailer
Service name.............STSLIB.005
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......03/03/19
Maximum Physical Record..65535
File Type............... .LO
Next File Name...........STSLIB.006
Physical EOF
File Header
Service name.............. .STSLIB. 006
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......03/03/19
Maximum Physical Record..65535
File Type................ LO
Previous File Name.......STSLIB.005
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SU1'1MARY
VENDOR TOOL CODE
PEF
NPHI
FCNT
NCNT
RPS
RPX
RPM
RPD
FET
GR
RHOB
DRHO
ROP
$
6
)
header data for each bit run in separate files.
5
.5000
START DEPTH
11200.5
11203.0
11203.5
11203.5
11221.0
11221.0
11221.0
1122.1. 0
11221.0
11230.5
11430.0
11430.0
11442.5
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIHUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
CNP
SLD
$
STOP DEPTH
11742.5
11732.5
11733.0
11733.0
llJ64.5
11764.5
11764.5
11764.5
11764.5
11772.0
11742.5
11742.5
11808.0
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
COMPENSATED NEUTRON
STABILIZED LITHO DEN
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
27-AUG-02
Insite
6.02
Memory
11809.0
11442.0
11809.0
16.3
17.6
TOOL NUMBER
124725
103792
119007
151842
8.500
11434.0
BARADRIL-N
9.00
46.0
10.5
15500
3.8
.250
.140
.226
.181
76.6
143.6
76.8
79.9
)
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.................Down
Optical log depth units...........Feet
Data Reference Point..............Undefined
Frame Spacing.....................60 .1IN
Max frames per record.............Undefined
Absent value...................... -999
Depth Units... . . . .. . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD050 FT/H 4 1 68 4 2
GR MWD050 API 4 1 68 8 3
RPX MWD050 OHMM 4 1 68 12 4
RPS MWD050 OHMM 4 1 68 16 5
RPM MWD050 OHMM 4 1 68 20 6
RPD MWD050 OHMM 4 1 68 24 7
FET MWD050 HOUR 4 1 68 28 8
NPHI MWD050 PU-S 4 1 68 32 9
FCNT MWD050 CNTS 4 1 68 36 10
NCNT MWD050 CNTS 4 1 68 40 11
RHOB MWD050 G/CM 4 1 68 44 12
DRHO .MWD050 G/CM 4 1 68 48 13
PEF MWD050 BARN 4 1 68 52 14
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 11200.5 11808 11504.3 1216 11200.5 11808
ROP MWD050 FT/H 10.77 397. 71 90.067 732 11442.5 11808
GR MWD050 API 21. 42 343.95 94.1571 1084 11230.5 11772
RPX MWD050 OHMM 0.18 976.7 12.3342 1088 11221 11764.5
RPS MWD050 OHMM 0.22 1035.81 20.0064 1088 11221 11764.5
RPM MWD050 OHMM 0.31 1211. 42 30.2418 1088 11221 11764.5
RPD MWD050 OHMM 0.31 2000 500.612 1088 11221 11764.5
FET MWD050 HOUR 0.32 76.9 31.3831 1088 11221 11764.5
NPHI MWD050 PU-S 12.2 81.63 44.2284 1060 11203 11732.5
FCNT MWD050 CNTS 405 1240 669.004 1060 11203.5 11 7 33
NCNT MW0050 CNTS 2200 3937 2794.52 1060 11203.5 11733
RHOB ~<'JD050 G/CM 1. 941 2.99 2.34232 626 11430 11742.5
DRHO MW0050 G/CM -0.191 0.707 0.0535911 626 11430 11742.5
PEF MWD050 BARN 1. 02 15.12 6.53824 1085 11200.5 11742.5
First Reading For Entire File..........11200.5
Last Reading For Entire File...........11808
File Trailer
Service name.............STSLIB.006
Service Sub Level Name...
Version Number...........1.0.0
Date of Generation.......03/03/19
Maximum Physical Record..65535
Fi 1 e Type................ LO
Next File Name...........STSLIB.007
Physical EOF
)
Tape Trailer
Service name.............LISTPE
Date.....................03/03/19
Origin...................STS
Tape Name................UNKNOWN
Continuation Number......Ol
Next Tape Name...........UNKNOWN
Comments. . . . . . . . . . . . . . . . . STS LIS
Reel Trailer
Service name.............LISTPE
Date.....................03/03/19
Origin...................STS
Reel Name................UNKNOWN
Continuation Number......Ol
Next Reel Name...........UNKNm'm
Comments.................STS LIS
Physical EOF
Physical EOF
End Of LIS File
')
Writing Library. Scientific Technical Services
Writing Libra.ry.
Scientific Technical Services