Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout202-159MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Monday, June 20, 2022 SUBJECT:Mechanical Integrity Tests TO: FROM:Matt Herrera P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp North Slope, LLC PSI-10 PRUDHOE BAY UNIT PSI-10 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 06/20/2022 PSI-10 50-029-23110-00-00 202-159-0 W SPT 8056 2021590 2014 2184 2186 2186 2187 161 517 517 520 4YRTST P Matt Herrera 6/4/2022 4 Year MIT-IA Performed to 2750 PSI Per Operations 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:PRUDHOE BAY UNIT PSI-10 Inspection Date: Tubing OA Packer Depth 35 2754 2739 2737IA 45 Min 60 Min Rel Insp Num: Insp Num:mitMFH220604121342 BBL Pumped:4.6 BBL Returned:4.1 Monday, June 20, 2022 Page 1 of 1 9 9 9 9 9 9 9 9 9 9James B. Regg Digitally signed by James B. Regg Date: 2022.06.20 16:49:03 -08'00' • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Tuesday,June 05,2018 TO: Jim Regg f�e_fet cv 113j,S SUBJECT: Mechanical Integrity Tests P.I.Supervisor BP EXPLORATION(ALASKA)INC. PSI-10 FROM: Austin McLeod PRUDHOE BAY UNIT PSI-10 I Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry S50-- NON-CONFIDENTIAL Comm Well Name PRUDHOE BAY UNIT PSI-10 API Well Number 50-029-23110-00-00 Inspector Name: Austin McLeod Permit Number: 202-159-0 Inspection Date: 6/2/2018 ' Insp Num: mitSAM180602144039 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min i 3 Well PSI-10 Typeppsi Inj W '!TVD 8056 - Tubing 553 - 553 • 553 554 ' _ Pumped: .3 BBL Returned: 3.5 OA 96 355 350 ' 349 j PTD 2021590 'Type Test SPT Test 2014 IA 340 2500 2487 2484 BBL PumP Interval 4YRTST P/F P Notes: MIT-IA SCANNED JUN 2 '2 LU a Tuesday,June 05,2018 Page I of 1 ) ) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. Q Ö:J... - [51-well History File Identifier Organizing (done) 0 Two-sided 1111111111111111111 0 Rescan Needed 1111111111111111111 RESCAN D,TAL DATA ...¡f Diskettes, No.3 0 Other, No/Type: OVERSIZED (Scannable) 0 Maps: 0 Color Items: 0 Greyscale Items: 0 Other Items Scannable by a Large Scanner 0 Poor Quality Originals: OVERSIZED (Non-Scannable) 0 Other: 0 Logs of various kinds: NOTES: Scanning Preparation :?) x 30 = ;° 0 Other:: ~I DateJ I,ll. ~11~11¡I/IIII~f Date 1/17 'Dtf Isl vt1 XJ + 7 = TQTAL PAGES 29 6Ca~~nt ir t inc~~a~~r s VtiP , 7 111111111111\\ 11111 BY: Helen ~ Project Proofing BY: Helen Marìa BY: Helen Maria Production Scanning Stage 1 Page Count from Scanned File: / () 0 (Caunt daes include caver sheet) Page Count Matches Number in Scanning Preparation: c/ YES. Helen~ Date: I 7 If NO in stage 1, page(s) discrepancies were found: YES BY: NO 04-/SI WI P Stage 1 NO BY: Helen Maria Date: /s/ I r \1 Scanning is complete at this point unless rescanníng is required. ReScanned 1111111111111111111 BY: Helen Maria Date: /s/ Comments about this file: Quality Checked 1111111\1\111111111 8/24/2004 Well History File Cover Page.doc • • bp BP Exploration (Alaska) Inc. ' � Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 'art December 21, 2010 s ..- JAN Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7 Avenue #19)xV Oat. 2, Gov Coos. C - fission Anchorage, Alaska 99501 Incir Subject: Corrosion Inhibitor Treatments of GPB PSI ONO / 59 Dear Mr. Maunder, PS 1 "� 1 Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB PSI that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Torin Roschinger BPXA, Well Integrity Coordinator • • BP Exploration Alaska Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) Date: 12/21/10 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement _ date inhibitor sealant date ft bbls ft na gal PSI - 2021450 50029231040000 NA 1 NA 5.10 10/25/2010 PS1-05 2031390 50029231740000 NA 1 NA 5.95 10/24/2010 PSI -06 2020790 50029230820000 NA 12.3 NA 45.90 10/25/2010 PSI -07 2031480 50029231770000 1.2 NA 6.80 10/24/2010 PS1-08 2021720 50029231140000 NA 1.3 NA 6.80 10/23/2010 PSI -09 2021240 50029230950000 NA 1.9 NA 12.80 10/23/2010 PSI -10 2021590 50029231100000 + ! NA 0.7 NA 3.40 10/23/2010 (..17 F , P 4 • MEMORANDUM To: Jim Regg ~~~c -7~~~(lo P.I. Supervisor 7 FROM: Jeff Jones Petroleum Inspector State of Alaska Alaska Oil and Gas Conservation Commission DATE: Monday, July 26, 2010 SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC PSI-10 PRUDHOE BAY UNIT PSI-] 0 Src: Inspector NON-CONFIDENTIAL Reviewed By: P.I. Suprv ~j ~~ Comm Well Name: PRUDHOE BAY UNIT PSI-10 Insp Num: mitJJ10072117s827 Rel Insp Num: API Well Number: 50-029-231 ]0-00-00 Permit Number: 202-159-0 Inspector Name: Jeff Jones Inspection Date: 7/4/2010 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well PSI-lo ~ Type Inj. ~' TVD I sos6 - IA o zsoo ~ zass zaso P.T.D zozts9o TypeTest sPT Test psi zota OA o zso ~ zso zso Interval aYRTST p~ P ~ Tubing vso Ipso ' lzbo Iz6o Notes: 3.7 BBLS methanol pumped. 1 well inspected; no exceptions noted. , Monday, July 26, 2010 Page 1 of 1 MEMORANDUM e State of Alaska e Alaska Oil and Gas Conservation Commission TO: Jim Regg P.I. Supervisor DATE: Wednesday, July 05,2006 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC PSI-IO PRUDHOE BAY UNIT PSI-IO .tI' ~O'} \6q FROM: Lou Grimaldi Petroleum Inspector Src: Inspector Reviewed By: P.I. Suprv :::þ? Comm Well Name: PRUDHOE BAY UNIT PSI-IO API Well Number 50-029-23 110-00-00 Inspector Name: Lou Grimaldi Insp Num: mitLG060701122406 Permit Number: 202- 159-0 Inspection Date: 7/I/2006 Rei Insp N urn Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well 1 PSI-IO ¡Type Inj. ! W ! TVD I 8056 ! IA i 320 i 2200 2180 I 2155 I 2150 I I I ¡ P.T. i 2021590 ì I; ! 2200 lOA I 810 i 1000 i 1000 i 1000 : 980 ¡TypeTest . SPT I Test psi i Interval 4YRTST P/F P Tubing! 1600 ! 1700 i 1700 i 1700 I 1650 Notes 3.0 bbl's pumped, test held for additional 15 minutes due to equal pressure loss in ist and 2nd intervals. Test "OK". / / NON-CONFIDENTIAL Wednesday, July 05, 2006 Page I of I e e MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFiche\CvrPgs _Inserts\Microfilm _ Marlœr.doc Schlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well MPC-41 MPG-05 MPL-33 P-06A DS 02-25 U.:S. 09-10 B-20 Y-25 PSI-10 P-26 02-14A F-12 04·35 ~5-09A 15-09A 5-09A J-13 D.S. 09-29 BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Job# 10889195 10715440 11058514 11132061 10987525 11058237 10980591 10928605 10715447 10928634 11075901 NA 10889172 10889183 NA 10919942 10877750 10980596 ~NE[) OCT 3 12DD5 Log Description SBH SURVEY MPSP INJECTION PROFILE INJECTION PROFILE LDL INJECTION PROFILE INJECTION PROFILE ~'"-~V\~~ ~ LDL MEM PPROF W/DEFT MPSP IPROF & WARMABACK MEM PPROF W/DEFT MEM PPROF & IPROF LDL SBHP SURVEY OIL PHASE BOTTOM HOLE SAMPLE OIL PHASE BOTTOM HOLE SAMPLE OIL PHASE BOTTOM HOLE SAMPLE LDL PPROF W/DEFT c o&-~~- Date 12/24/04 11/09/04 06/03/05 10/12/05 06/24/05 08/16/05 08/05/05 11/20/04 01/01/05 06/02/05 07109/05 06/03/05 10/10/04 11/04/04 02/02/05 02/13/05 06/29/04 08/10/05 10/18/05 NO. 3503 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay BL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Color CD -- Alaska Data & Consulting Services 2525 Gambell Street, Suite 40 Anchorage, AK 99503- 8 ATTN: Beth Received by: , ðJh-d: 2 .t\}'~~~~ b~,~.'4~~.~~JJ2. }e:( ~J~\Î ;tc)~ DATA SUBMITTAL COMPLIANCE REPORT 10/29/2004 Permit to Drill 2021590 Well Name/No. PRUDHOE BAY UNIT PSI-10 Operator BP EXPLORATION (ALASKA) INC Jf~¿ t~ ~~~ API No. 50-029-23110-00-00 MD 11809 r- TVD 8594 ,.. Completion Date 10/14/2002 ..~ Completion Status 1WINJ Current Status 1WINJ £UI-C Y )~ REQUIRED INFORMATION Mud Log No Samples No Directional Survey~ ./ DATA INFORMATION Types Electric or Other Logs Run: MWD, GR, RES, USIT, NEU, LWD, BHC Sonic Well Log Information: (data taken from Logs Portion of Master Well Data Maint) Log/ Electr Data Digital Dataset Log Log Run Interval OH/ Type ....JVIed/Frmt Number Name Scale Media No Start Stop CH Received Comments ~D -11'674 LiC Vorifiootio-.1" c.,l. t u.J V\. &.( CJ>I Y' ..sCola r<~1' 1 112 11771 Open 3/26/2003 ~ Directional Survey 0 11809 Open 1 0/9/2002 ~. Temperature \. '^'" ,or) 5 Blu final 8634 11711 Case 11/1/2002 With Jewelry ~ -sc)nic M.D 25 Blu 10954 11800 Case 11/8/2002 u.eg Sonic '-. V-"'''' 5 Col 8760 11432 Case 10/1/2002 ~. Directional Survey 0 11809 Open 10/9/2002 MWD f>IJ 0 Directional Survey 0 11809 Open 10/9/2002 MWD ~ 0 Directional Survey 0 908 Open 10/9/2002 GYRO -.J.Dg' "-Sonic S S "" 1\ 25 Blu 10954 11800 Case 11/8/2002 A ~ment Evaluation 5 Col Field 8760 11432 Case 10/1/2002 c.6Y' 0 Directional Survey 0 11809 Open 10/9/2002 ~ Directional Survey 0 908 Open 1 0/9/2002 GYRO Log Pressure 5 Blu final 8634 11711 Case 11/1/2002 With Jewelry vÆó C ~89 See Notes 10954 11800 Case 11/8/2002 LDWG edit of BHC log ~ LIS Verification 112 11771 Open 3/26/2003 ,ED C Tf ~ 2190 LIS Verification 1-5 111 11809 Case 1 0/27/2003 ED C Pdf 12190 Rate of Penetration 25 1-5 111 11809 Case 1 0/27/2003 ROP, DGR, EWR- MWD /' ED C Pdf J2190 Induction/Resistivity 25 1-5 111 11809 Case 1 0/27/2003 ROP, DGR, EWR - MWD ED C Pdf 12190 Density 25 1-5 111 11809 Case 1 0/27/2003 DGR, SLD, CNP - MWD ./ ED C Pdf c.., 2190 Neutron 25 1-5 111 11809 Case 1 0/27/2003 DGR, SLD, CNP - MWD Permit to Drill 2021590 MD 11809 Well Cores/Samples Information: TVD 8594 Name Well Cored? ADDITIONAL INFORMATION v(&) Chips Received? ~ Y / N Analysis Received? Comments: ~ Compliance Reviewed By: DATA SUBMITTAL COMPLIANCE REPORT 10/29/2004 Well Name/No. PRUDHOE BA V UNIT PSI-10 Operator BP EXPLORATION (ALASKA) INC API No. 50-029-23110-00-00 Completion Date 10/14/2002 Completion Status 1WINJ Interval Start Stop Sent Received Daily History Received? Formation Tops .L Current Status 1WINJ Sample Set Number Comments @ (J¡IN Date: UIC V /¡- tV"", ~y ) J §o()-15¡ WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 333 West 7th Avenue, Suite 100 Alnchorage,AJaska 99501 October 17, 2003 RE: MWD Formation Evaluation Logs: PSI-10, AK-MW-22135 PSI-tO: Digital Log Images 50-029-23110-00 I CD Rom 1 @.l '10 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, AJaska 99518 BP Exploration (AJaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Alnchorage, AJaska 99508 Date: Signed~(:\~ ~\.~ () ('T f') '7 \,Ji.." ¡ r..... í ~~~~f\~~ ) ') WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 33 3 West 7th Avenue, Suite 100 Anchorage, Alaska March 21, 2003 RE: MWD Formation Evaluation Logs PSI-10, AK-MW-22135 1 LDWG formatted Disc with verification listing. llPI#: 50-029-23110-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-Technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date: ~ì S¡gneC ~ ;;¡¿ßp:J RECEIVED MAR 2 6 2003 AI_a on & Gas Cons. Commiteion Anchorage aœ-)59 / II£; Ie¡ Shared Services Drilling "'-'\ C?/ 0:::3, - ¡ t::Q Handover Fo'rm To Drilling: Well: PSI-10 To Production: XXXXX AFE Number: PBD4P1924 Well Information Pre Rig Work Cost:. $ API Number: 50-029-23110 SITP: 0 Production Csg Pressure: 0 Surface Csg Pressure: 0 BHP: Depth:8594 (TVD) Freeze Protection Fluid: Weight: Diesel 6.8 Date:9/2I2002 Date:9/2I2002 Date: 9/212002 Date:9/2I2002 Surface x Int. Annulus: Inj. Well: Inj. Well: Frz Prot? yes Depth: 0-2200 Amount: 138 bbl Annulus: Annulus: Tubing: Tubing: Tree Type: Inlay Top of Fill or Junk: BPV Installed (Yes/No): Yes Dummy GLVls (Yes/No): No New Casing String Installed During this Workover (Yes/No): Well bore Fluids Fluid Type: Weight: nie~el 6.8 KCI Rrine 8.5 niesel 6.8 KCI Rrine 8.5 Downhole Information PBTD: 11.7221 Last TD tag Date: 8/29/2002 Downhole Plugs (Yes/No): SSSV and Insert (Yes/No): Yes No Yes SPF: Depth: O-??OO 1 : ??00-11 ,?OO 2: O-??OO 3: ??00-11 ,?OO 4: Perf Intervals From: Fluid Loss During Workover Fluid Type: Weight: Amounts (bbls): To: Perfs Squeezed: No * General Information -~ -- \VA!l-cW3~dril~d-tAM~-41J&ßQI.--A"1~I--I~-r~i-.--with-t4\P::=' 11 ,~-1-A1. and-Iandina ~nlh'r :It 11, 7~41. Th~ w~1I wa~ I!nmpl~t~d with 7 !?alA II tubi~q frnm ~..rf:ll!~ with W. -=~ :I' 11 ,2AAI, th~ PKR :It 11,2441. Th~ tuhina :lnd :lnnulu~ w~r~ t~~t~d tn 4nnn p~i. Th~ 7 !?alA II X Q !?alA II :lnnulu~ i~ fr~~7~ prnt~l!t~d tn ~~nnl with di~~~1 :lnd I!nrrn~inn inhibit~d K~. "rin~ tn 11 ,2nnl. * Fish (attach diagram of fish), tight spots, leaks, etc. Attach Tubing and Completion Detail Forms. Completion Equipment MfgrlType/Size/Dummy or Orifice/Latch SSSV: Camco nR Nipple for i~ection valve Land Nipple: GLM: GLM: GLM: GLM: GLM: GLM: GLM: GLM: GLM: GLM: GLM: GLM: X Nipple: Sldg Sleeve: PBR/SBR: Packer: X Nipple: R NIPPI F 6.'76 In WLEG: Blast Ring Packer: X Nipple: NoGo Nipple: Shear Sub: WLEG: WI FG 7" Drlg Rep: Rill nAr-kAr Title: nrillin~ ~ltpArvi~nr Revised: 10/25/95 by SRW Top (md) It '19' 11 ,179 PRR RAKFR T1 X 9 5/811 ~ARI -3 pkr with '01 PRR R NIPPI F. 5.963 In RN NO GO NIPPI F. 5.7711 In 11 '03 11'44 11'63 11'75 11 'BB Date: 9/03/?00? Production Rep: TitlA: Date: ) ') STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: ADD PERFS 2. Name of Operator BP Exploration (Alaska), Inc. 3. Address P. O. Box 196612 Anchorage, AK 99519-6612 4. Location of well at surface Operation shutdown- Pull tubing - Stimulate - Alter casing - 5. Type of Well: Development - Exploratory- Stratigraphic- Service_X 1394'FNL,4322'FEL,Sec. 15,T11N, R15E,UM At top of productive interval 129' FNL,2073' FEL, Sec.09,T11N, R15E,UM At effective depth 69'FNL,2099'FEL,Sec.09,T11N, R15E,UM At total depth 45'FNL,2109'FEL,Sec.09, T11N,R15E,UM 12. Present well condition summary Total depth: measured true vertical (asp's 708081, 5966190) (asp's 704857, 5972649) (asp's 704829, 5972709) (asp's 704819, 5972732) 11809 feet 8594 feet Plugs (measured) Plugging - Perforate _X Repair well - Other - 6. Datum elevation (OF or KB feet) RKB 50 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number PSI-10 9. Permit number / approval number 202-159 10. API number 50-029-23110-00 11. Field / Pool Prudhoe Bay Oil Pool Effective depth: measured 11718 feet Junk (measured) true vertical 8507 feet Casing Length Size Cemented Measured Depth True Vertical Depth Conductor 73' 20" 260 sx Arctic Set (aprox) 108' 108' Surface 6032' 13-3/8" 1329 sx AS III Lite, 601 6067' 4678' sx Class 'G' Intermediate 1140 l' 9-5/8" 618 sx Class 'G' 11432' 8234' Liner 489' 7" 145 sx Class 'G' 11320' - 11809' 8127' - 8594' Perforation depth: measured Open Perfs 11488'-11548', 11562'-11586', 11620'-11666', 11688'-117¡ E eEl V E D DEC 192002 true vertical Open Perfs 8287'-8344', 8358'-8381 " 8413'-8457', 8478'-8498' Alaska Oil & Gas Cons. Commission Tubing (size, grade, and measured depth) 7-5/8" 29.7# L-80 @ 2191' MD. 7-5/8" x 7" XO @ 2191'. 7" x 7-5/8" XO @ 21Bg~orage 7-5/8" 29.7# L-80 @ 11168' MD. 7-5/8" x 7" XO @ 11168'. 7" 26# L-80 @ 11288'. Packers & SSSV (type & measured depth) 7" X 9-5/8" Baker SABL-3 Packer @ 11244' MD. 7" X 9-5/8" BKR ZXP LNR TOP PKR W/ TIEBACK SLV @ 11327'. 13. Stimulation or cement squeeze summary Intervals treated (measured) (see attached) Treatment description including volumes used and final pressure 14. Representative Daily AveraQe Production or Injection Data Oil-Bbl Gas-Mct Water-Bbl 107,768 Prior to well operation 11/17/2002 Subsequent to operation 11/28/2002 15. Attachments Copies of Logs and Surveys run - Daily Report of Well Operations - Oil - Gas - 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. A~~J~ DeWayne R. Schnorr 7" Camco DB NIP @ 2192'. Casing Pressure Tubing Pressure 2248 2157 109,064 16. Status of well classification as: Title: Technical Assistant Form 10-404 Rev 06/15/88 . Suspended - Service WATER INJECTION Date December 05.2002 Prepared by DeWayne R. Schnorr 564-51~~,~ SUBMIT IN DUPLICATE ~ ) ') PSI-10 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS 11/01/2002 11 /02/2002 11 /04/2002 11/24/2002 12/02/2002 12/04/2002 NEW WELL POST: AC-FLUID LEVEL NEW WELL POST: AC-MITIA NEW WELL POST: AC-MONITOR NEW WELL POST: PERFORATING NEW WELL POST: SSSV C/O OR STROKE TESTEVENT --- IN] PRESS, PSI: 1,956 TYPE: PW VOL: 103,582 BWPD EVENT SUMMARY 11/01/02 T/I/O = 900/20/360, IA FL @ SURFACE POST INJECTION START-UP. 11/02/02 T/I/0=850/0+/350 MITIA TO 2100 PSI. PASSED (AOGCC WITNESSED, JEFF JONES). INITIAL IA FL AT SURFACE. MITIA LOST 5 PSI IN THE FIRST 15 MINUTES AND 5 PSI IN THE SECOND 15 MINUTES FOR A TOTAL OF 10 PSI IN 30 MINUTES. PUMPED 3 BBLS OF 60/40 METHANOL DOWN THE IA. FINAL WHp1s = 850/300/350. 11/04/02 T/I/O= NA/240/70 (POST MITIA) 11/24/02 PERFORATED 114881 - 115481 AND 115621 - 115861 WITH 33/811 HSD GUNS 6 SPF POWERJET. RDMO. WELL READY TO INJECT. 12/02/02 SET 711 A-1 ISSSV (WATER INJECTION VALVE) W/ DB-6 LOCK. (SER # HTS-639, 4911 OAL.) NO CLOSURE TEST DUE TO WELL ON VAC., TATTLE TAIL IN RUNNING TOOL INDICATES GOOD SET. ****RETURNED WELL FOR INJECTION***** 12/04/02 TESTEVENT --- IN] PRESS, PSI: 1,956 TYPE: PW VOL: 103,582 BWPD. Fluids Pumped BBLS 1 4 5 DIESEL FOR SURFACE PRESSURE TEST (1 TESTS) 60/40 METHANOL WATER TOTAL ADD PERFS 11/24/2002 THE FOLLOWING INTERVALS WERE PERFORATED USING 3-3/811 3406-PJ, 6 SPF, 60 DEGREE PHASING, RANDOM ORIENTATION. 114881 - 115481 11562' - 11586' Page 1 Se_lumblrger Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 A TTN: Beth Well Job# Log Description Date PSI-09 ~~-la4 22346 OH EDIT DSI (PDC) 07/18/02 PSI-09 J" 22346 DSI 07/18/02 PSI-09 22346 DSI DEL TA~T COMP 07/18/02 PSI-10 d~-15, 22423 OH EDIT BHC (PDC) 08/28/02 PSI-10 J, 22423 SONIC LOG 08/28/02 PSI-10 22423 SONIC LOG SSTVD 08/28/02 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 f~ECEiVØ.'D f~OV 08 2002 Date Delivered: Ala&tt8 ûr~ ü; GZi3 vunfj;, L;¡::.mn~~5ioH M,d1~g{; Blueline 11/04/02 NO. 2528 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 F'eld: Prudhoe Bay Sepia Color Prints ~ CD 1 1 1 1 Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 A lchorage, AK 99503-5711 A-rN: Beth Roceive~ GJ)oo~ 1. Status of Well 0 Oil 0 Gas 0 Suspended 0 Abandoned fiI Service 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 3886' NSL, 4322' WEL, SEC. 15, T11 N, R15E, UMrG{;¡~iF¡:.Êfi6¡rt At top of productive interval .1 DATE ¡ 5151' NSL, 2073' WEL, SEC. 09, T11N, R15E, UM ¿ jb, ;1'1";.021; 5~~~~~k~~~t~09' WEL, SEC. 09, T11N, R15E, UM ! "~~..~:~~=! 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease bðstg11atiön"arfd Serial No. KBE = 50.45' ADL 034631 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 8/10/2002 8/27/2002 1 0/14/2002 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 11809 8594 FT 11718 8507 FT fiI Yes 0 No 22. Type Electric or Other Logs Run MWD, GR, RES, USIT, NEU, LWD, v 23. CASING SIZE 34" X 20" 13-3/8" 9-5/8" WT. PER FT. 91.51# 68# 47# 26# 7" ) ) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Classification of Service Well Gas Cap Injection 7. Permit Number 202-159 8. API Number 50- 029-2311 0-00 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number PSI.10 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 15. Water depth, if offshore 16. No. of Completions N/A MSL One 20. Depth where SSSV set 21. Thickness of Permafrost (Nipple) 2192' MD 1900' (Approx.) GRADE H-40 L-80 L-80 L-80 BHC Sonic CASING, LINER AND CEMENTING RECORD SETTING DEPTH HOLE Top BOTTOM SIZE CEMENTING RECORD Surface 73' 42" ,260 sx Arctic Set (Approx.) 35' 6067' 16" 1348 sx Articset III Lite, 600 sx 'G' 311 11432' 12-1/4" 618 sx Class 'G' 11320' 11809' 8-1/2" 146 sx Class IGI AMOUNT PUllED 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 3-3/8" Gun Diameter, 6 spf MD TVD 11620' - 11666' 8413' - 8457' 11688' - 117081 84781 - 8498' Flow Tubing Casing Pressure CALCULATED Press. 24-HoUR RATE 28. CORE DATAn[ C [ , V [ D Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core <ßp . 27. Date First Production October 28, 2002 Date of Test Hours Tested No core samples were taken. Form 10-407 Rev. 07-01-80 25. TUSING RECORD DEPTH SET (MD) PACKER SET (MD) SIZE 7-5/8",29.7#, L-80 x 7",26#, L-80 11288' ACID, FRACTURE, CEMENT SaUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protect with 138 Bbls of Diesel MD TVD 11243' 26. PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) Water Injection PRODUCTION FOR Oll-BSl TEST PERIOD GAs-McF WATER-Bsl CHOKE SIZE GAS-Oil RATIO Oll-Bsl GAs-McF WATER-BsL Oil GRAVITY-API (CORR) RBDMS 8Fl NOV '8 NOV 0 5 2002 Alaska Oil & Gas Cons. Commission Anchorage e,f Submit In Duplicate .. 29. ') 30. Geologic Markers Measured Depth Marker Name SV4 SV3 SV2 SV1 Ugnu 4 Ugnu 4A Ugnu 3 Ugnu 1 West Sak 2 West Sak 1 CM3 CM2 CM1 HRZ Base HRZ / LCU / Top Zone 3 Zone 2C Zone 28 Zone 2A Zone 1 B Kavik 31. List of Attachments: Formation Tests True Vertical Depth Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. 4195' 4840' 51661 5802' 6600' 6683' 69861 8038' 9020' 9358' 96961 10674' 10813' 11266' 11488' 11491' 11529' 11633' 11666' 8569' 3513' 3922' 4123' 45101 5016' 5069' 5256' 5874' 6451' 66481 6847' 7551' 7667' 8077' 8287' 8290' 8326' 84261 8457' 85691 RECEIVED NOV 0 5 2002 Alaska on & Gas Gons. Commission Anchorage Summary of Daily Drilling Reports and Post Rig Summary, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Tenie Hubble ~QAJIi¿ ~ TrtJe Technical Assistant Date II rO<.f .o^- PSI-10 202-159 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. Drilling Engineer: Walter Quay, 564-4178 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Legal Name: PSI-10 Common Name: PSI-10 Test Date 8/18/2002 8/26/2002 FIT FIT Test Type Test Depth (TMD) 6,077.0 (ft) 11,432.0 (ft) BP Leak-Off Test Summary Test Depth (TVD) 4,684.0 (ft) 8,233.0 (ft) AMW 9.00 (ppg) 9.00 (ppg) Surface Pressure 730 (psi) 429 (psi) Leak Off Pressure (BHP) 2,920 (psi) 4,278 (psi) Page 1 of 1 EMW 12.00 (ppg) 10.00 (ppg) ",-," -- Printed: 9/4/2002 10:55:30 AM ) } BP Qp~ratiøl1$..SI.l~~~rY....R.øþQrt Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: PSI-10 PSI-10 DRILL +COMPLETE NABORS NABORS 27ES HöUrs Task .Còdé NPT Phase 8/9/2002 10:00 - 00:00 14.00 MOB PRE P 8/10/2002 3.00 RIGU P PRE 00:00 - 03:00 03:00 - 04:30 1.50 BOPSUR P SURF 04:30 - 06:00 1.50 BOPSUR P SURF 06:00 - 07:00 1.00 BOPSURP SURF 07:00 - 12:00 5.00 DRILL P SURF 12:00 - 16:30 4.50 DRILL P SURF 16:30 - 17:30 1.00 DRILL P SURF 17:30 - 18:00 0.50 DRILL P SURF 18:00 - 00:00 6.00 DRILL P SURF 8/11/2002 00:00 - 05:00 5.00 DRILL P SURF 05:00 - 07:30 2.50 DRILL N RREP SURF 07:30 - 09:00 1.50 DRILL N RREP SURF 09:00 - 00:00 15.00 DRILL N RREP SURF 8/12/2002 00:00 - 17:00 17.00 DRILL N RREP SURF 17:00 - 20:00 3.00 DRILL N RREP SURF 20:00 - 00:00 4.00 DRILL P SURF 8/13/2002 00:00 - 23:00 23.00 DRILL P SURF 23:00 - 00:00 1.00 DRILL P SURF 8/14/2002 00:00 - 00:30 0.50 DRILL P SURF 00:30 - 03:00 2.50 DRILL P SURF 03:00 - 03:30 0.50 DRILL P SURF 03:30 - 05:30 2.00 DRILL P SURF 05:30 - 06:30 1.00 DRILL P SURF 06:30 - 07:30 1.00 DRILL P SURF 07:30 - 00:00 16.50 DRILL P SURF 8/15/2002 00:00 - 10:30 10.50 DRILL P SURF 10:30 - 13:00 2.50 DRILL P SURF Start: 8/9/2002 Rig Release: 9/3/2002 Rig Number: Spud Date: 8/10/2002 End: 9/3/2002 pe~cf'iþti(jr'qf()p~ra~ionš Rig down. Move rig from PSI-01 to PSI-10. Spot rig components. Check all service lines and turn on water, steam, and air. Set fuel tank, water tanks, and hi line unit. NU 20" diverter while taking on spud mud. Rig accepted at 03:00 on 8/10/2002. NU riser and flow line. Load pipe shed with 5" DP. Lubricate rig. Function test diverter. Witness of test waived by John Spaulding of AOGCC. PU 120 joints of 5" DP and rack in derrick. PU drill collars, flex collars, and jars and stand in derrick. PU MWD, bit, and motor. RU slickline unit for gyro surveys. Fill stack with spud mud, start circulating and check system for leaks. Spud well and drill 16" hole to 500'. Start directional work at 270'. Run slickline gyro every 100' due to magnetic interference. Drill from 500' to 916' continue building angle. Run wireline gyro every 100'. Pull off bottom 2 stands. Trouble shoot noise in top drive. POH to repair top drive. Disassemble top drive. Found crack in race on torque boost bearing. Reassemble top drive and dial in traction motor. Install torque boost. Repair top drive. RIH with BHA and one stand of DCs and test top drive with weight. POH, rack back BHA. RIH with 3 stands of DCs and test top drive with CanRig personnel. Complete assembiling top drive. RIH to 460'. Circulate bottoms up. RIH to 800'. Run slickline gyro check shot. RIH to 916', no fill on bottom. Check tóp drive. Drill 16" directional hole from 916' to 1 ,105'. Slide to build angle. AST=1.9, ART=O. Drill 16" directional hole from 1,105' to 3357'. Slide and rotate to build angle and maintain direction. AST=13.16, ART=2.8. Circulate and condition mud prior to wiper trip. Circulate and condition mud prior to wiper trip. POH to 385'. Tight hole from 2078' to 2054'. Worked through tight spot to clean up same. Service rig and check top drive. RIH from 385', held up at 1953'. Work pipe from 1953' to 2091'. Orient tool to high side and work pipe down with and with out pumping. RIH to 3357' Drill 16" directional hole from 3357' to 5418'. Slide and rotate to maintain direction and angle. AST=1.47, ART=9.58. Drill directional hole from 5418' to 6077' TD of 16" section. Circulate and condition mud. Circulate around 50 bbllow vis Printed: 9/4/2002 10:55:43 AM ) ) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: PSI-10 PSI-10 DRILL +COMPLETE NABORS NABORS 27ES Start: 8/9/2002 Rig Release: 9/3/2002 Rig Number: Spud Date: 8/10/2002 End: 9/3/2002 Date From",.To Hours Task CÓde NPT Phase [)~?criptionQf()þ~l"ätiQns 8/15/2002 10:30 - 13:00 2.50 DRILL P SURF sweep. No significent cuttings increase on bottoms up. 13:00 - 15:30 2.50 DRILL P SURF POH to 3262'. No excessive drag. 15:30 -16:30 1.00 DRILL P SURF RIH to 6077'. No fill on bottom. 16:30 - 18:30 2.00 DRILL P SURF Circulate hole clean. Spot 120 bbl Barfiber pill on bottom. 18:30 - 22:00 3.50 DRILL P SURF POH for casing. Tight spot at 1955' work pipe through to clean up same. 22:00 - 23:00 1.00 DRILL P SURF Stand back HWDP, flex collars and drill collars. 23:00 - 00:00 1.00 DRILL P SURF Down load MWD. Lay down MWD, mud motor and bit. 8/16/2002 00:00 - 00:30 0.50 DRILL P SURF Lay down MWD, mud motor and bit. 00:30 - 03:30 3.00 CASE P SURF Rig up to run 133/8" casing. Make up fill up tool. 03:30 - 04:00 0.50 CASE P SURF PJSM with casing crew and rig crew. 04:00 - 04:30 0.50 CASE P SURF Make a dummy run with landing joint and casing hanger. 04:30 - 16:30 12.00 CASE P SURF Make up 13 3/8" float shoe and float collar and check same. Run 147 jts 13 3/8" 68# L-80 BTC casing with shoe at 6067, Float Collar at 5981' and Tam Port Collar at 1017'. Work pipe through tight spots, circulate and wash down from 2130' to 2378',2674' to 2748' and 3852' to 4224'. Wash down last joint as precaution. Make up landing joint with casing hanger and land casing. 16:30 - 19:00 2.50 CEMT P SURF Circulate and condition mud. Lower vis to 38 and YP to 7. 19:00 - 20:00 1.00 CEMT P SURF Lay down fill-up tool. Make up Dowell cementing head and lines. 20:00 - 22:00 2.00 CEMT N WAIT SURF Circulate while waiting on 3 vac trucks. Trucks occupied on rig 9ES surface cement job. Hold PJSM with cementers and drilling crews. 22:00 - 00:00 2.00 CEMT P SURF Dowell pump 5 bbl water and test lines to 3500 psi. Pump 75 bbl Mudpush XL Spacer at 10.2 ppg. Drop bottom plug. Mix and pump 1066 bbl (1348 sks) ASIII Lead slurry at 10.7 ppg at 8 bpm. 8/17/2002 00:00 - 02:30 2.50 CEMT P SURF Dowell complete pumping Lead Slurry of 1066 bbl (1348 sks) ASIII Lead slurry at 10.7 ppg at 8 bpm. Mix and pump Tail Slurry of 125 bbl (600 sks) Class 'G' cement at 15.8 ppg. Drop top plug and displace with 902 bbl mud using the rig pumps at 12 bpm. Full returns, 250 bbl cement to surface. Plugs did not bump. Pumped 1/2 shoe track volume. Bleed off pressure. Floats held. 02:30 - 04:30 2.00 CEMT P SURF Rig down casing running tools, cement head and lines. Clear rig floor. 04:30 - 05:30 1.00 CEMT P SURF Inspect and service top drive. Clean 20" diverter, riser and flow line. 05:30 - 06:00 0.50 DIVRTR P SURF PJSM on nipple down BOP. 06:00 - 09:00 3.00 DIVRTR P SURF Nipple down riser, 20" diverter and 16" diverter line. 09:00 - 10:30 1.50 WHSUR P SURF Install FMC 13 5/8" 5M Split Unihead and test to 5000 psi. 10:30 - 17:30 7.00 BOPSURP SURF Nipple up 135/8" 5M BOP, bell nipple and lines. Remove 20" diverter from cellar. 17:30 - 18:30 1.00 BOPSURP SURF Install TIW valve and saver sub on top drive. 18:30 - 23:30 5.00 BOPSUR P SURF Test BOP and associated equipment to 250 psi low and 4000 psi high for 5 minutes. Test witnessed by Chuck Scheve of AOGCC. 23:30 - 00:00 0.50 BOPSURP SURF Rig down BOP testing equipment. Install wear bushing. 8/18/2002 00:00 - 00:30 0.50 BOPSUR P SURF Rig down BOP testing equipment. Install wear bushing. Blow down kill line. 00:30 - 02:00 1.50 DRILL P INT1 Lay down 8" steel drill collars from derrick. Printed: 9/4/2002 10:55:43 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: PSI-10 PSI-10 DRILL +COMPLETE NABORS NABORS 27ES Start: 8/9/2002 Rig Release: 9/3/2002 Rig Number: Spud Date: 8/10/2002 End: 9/3/2002 Date FrÓm."'.."'o HOÛfS Task Code NPT Phase [)èsþri þtiþh.ÓtQÞØtatiops 8/18/2002 02:00 - 07:30 5.50 DRILL P INT1 Pick up rebuilt 12 1/4" PDC bit and BHA. Test adjustable stabilizer. 07:30 - 08:00 0.50 DRILL P INT1 PJSM on picking up 5" drill pipe from pipe shed. 08:00 - 10:30 2.50 DRILL P INT1 Pick up 150 joints 5" drill pipe from pipe shed. 10:30 - 12:00 1.50 DRILL P INT1 RIH with drilling BHA on 5" drill pipe from derick. Tag up on cement plugs at 5958'. 12:00 - 13:30 1.50 DRILL P INT1 Rig up to test casing. Pressure test casing to 3500 psi for 30 minutes. 13:30 - 15:00 1.50 DRILL P INT1 Drill cement plugs, cement, float collar at 5981', firm cement, float shoe at 6067' and 20' of formation to 6097'. Start swapping mud while drilling cement. 15:00 - 16:00 1.00 DRILL P INT1 Circulate and swap mud to LSND 9.0 ppg, condition new mud. 16:00 - 16:30 0.50 DRILL P INT1 Perform FIT. EMW 12.0 ppg 16:30 - 17:00 0.50 DRILL P INT1 Check MWD. Establish ECD base line. 17:00 - 00:00 7.00 DRILL P INT1 Drill 12 1/4" directional hole from 6097' to 6614'. Rotate and slide to maintain angle and direction. ART= 4.3 ART=0.8 8/19/2002 00:00 - 12:30 12.50 DRILL P INT1 Drill 12 1/4" directional hole from 6614' to 7873'. Rotate and slide to maintain angle and direction. AST= 4.2 ART= 3.52 12:30 - 13:00 0.50 DRILL N RREP INT1 Repair mud pump #1. Change valve and spring. 13:00 - 17:30 4.50 DRILL P INT1 Drill 12 1/4" directional hole from 7873' to 8248'. Rotate and slide to maintain angle and direction. AST= 1 ART=2.5 17:30 - 18:30 1.00 DRILL P INT1 Circulate 28 bbl high vis sweep out of hole. Annulus laoding up with cuttings, ECD 9.8 ppg. 18:30 - 00:00 5.50 DRILL P INT1 Drill 12 1/4" directional hole from 8248' to 8685'. Rotate and slide to maintain angle and direction. AST= 1 ART=1.2 8/20/2002 00:00 - 12:00 12.00 DRILL P INT1 Drill Ahead From 8,685' To 9,755' - Weight On Bit 5K To 20K With Pump Rate At 203 Strokes Or 850 GPM - Off Bottom Pump Pressure At 3200 Psi. & On Bottom Pump Pressure At 3650 Psi. - Top Drive RPM At 60 To 100 - Off Bottom Torque At 19K & On Bottom Torque At 24K - String Rotating Weight At 185K - With Pump Off Drag Up At 285K And Drag Down At 145K Actual Slide Time = 0 Hours Actual Rotating Time =7.43 Hours 12:00 - 14:00 2.00 DRILL P INT1 Circulate Hi-Vis Sweep For Short Trip 14:00 - 18:00 4.00 DRILL P INT1 Hold Pre-Job Safety Meeting - Monitor Well Bore (Static) - POH With 5" Drill Pipe To 9,194' - Start To Swab Connect Top Drive And Pump Out Of The Hole - Starting To Pack Off At 7,506' 18:00 - 18:30 0.50 DRILL P INT1 Rotate Drill String At 7,506' And Establish Good Circulation Stage Pumps Up To 850 GPM 18:30 - 21 :30 3.00 DRILL P INT1 Continue To POH While Pumping And Back Reaming- Attempt To Pull Pipe With Out Pumping At Different Spots Still Wanting To Swab (Pump Out Of Hole) - Tight At 7,127' - 6,307' Printed: 9/4/2002 10:55:43 AM ,) Legal Well Name: PSI-10 Common Well Name: PSI-10 Spud Date: 8/10/2002 Event Name: DRILL +COMPLETE Start: 8/9/2002 End: 9/3/2002 Contractor Name: NABORS Rig Release: 9/3/2002 Rig Name: NABORS 27ES Rig Number: Date Phåsé 8/20/2002 18:30 - 21 :30 3.00 DRILL P INT1 - 6,117' Pull Into 13 3/8" Casing Shoe Torque At 1 OK Surging To 18K 21 :30 - 22:00 0.50 DRILL P INT1 Monitor Well Bore (Static) - Circulate Across Top Of Hole With Trip Tank System - Hold Pre-Job Safety Meeting Regarding Drill Line Cutting Operation 22:00 - 23:30 1.50 DRILL P INT1 Slip And Cut 110' Of 1 3/8" Drill Line - Adjust Draw Works Mechanical Brakes 23:30 - 00:00 0.50 DRILL P INT1 Service Can-Rig Top Drive, Traveling Blocks And Crown Sheaves 8/21/2002 00:00 - 00:30 0.50 DRILL P INT1 Continue To Service Can-Rig Top Drive, Traveling Blocks And Crown Sheaves 00:30 - 02:00 1.50 DRILL P INT1 Hold Pre-Job Safety Meeting - RIH From (6,005') 13 3/8" Casing Shoe With 5" Drill Pipe From Mast To 7,880' And Fill Drill String - Continue To RIH To 9,661' (No Problems)- Connect Top Drive Break Circulation And Wash Last Stand To Bottom At 9,755' (No Fill) 02:00 - 10:00 8.00 DRILL P INT1 Directional Drill Ahead (Begin Droping Angle) From 9,755' To 9,973' - While Conditioning Mud To Lower Gel Strengths And Adding Lubricants For Sliding And Torque - Change Shaker Screens To Finer Mesh And Pump Sweeps Every 300 Feet- Weight On Bit 5K To 20K With Pump Rate At 203 Strokes Or 850 GPM - Off Bottom Pump Pressure At 3200 Psi. & On Bottom Pump Pressure At 3650 Psi. - Top Drive RPM At 60 To 100 - Off Bottom Torque At 19K & On Bottom Torque At 24K- String Rotating Weight At 180K - With Pump Off Drag Up At 320K And Drag Down At 150K Actual Slide Time = 1.6 Hours Actual Rotating Time = 2.0 Hours 10:00 - 10:30 0.50 DRILL N DFAL INT1 Sperry Sun MWD Tool Failure - Check And Attempt To Get Working (NO GOOD) 10:30 - 12:00 1.50 DRILL N DFAL INT1 Circulate Bottoms Up And Condition Mud For Trip 12:00 - 15:00 3.00 DRILL N DFAL INT1 Hold Pre-Job Safety Meeting - Monitor Well Bore (Static) - POH With 5" Drill Pipe From 9,973' To 9,663' - Start To Swab Connect Top Drive And Pump Out Of The Hole To (Tight Spot) At 9,275' - Back Ream From 9,289' To 9,194' And Clean Up This Section - Continue To Pump Out Of The Hole From 9,194' To 8,820' - POH With Out Pumping To 8,443' Hole Conditions Good And Taking Correct Fill On Steel Displacement 15:00 -15:30 0.50 DRILL N DFAL INT1 Monitor Well Bore (Static) - Pump Dry Job - Blow Down Top Drive 15:30 - 18:30 3.00 DRILL N DFAL INT1 Continue To POH With 5" Drill Pipe Stand Back In Mast From 8,443' To 547' (BHA) 18:30 - 19:30 1.00 DRILL N DFAL INT1 Monitor Well Bore (Static) - Hold Pre-Job Safety Meeting - Rack Back In Mast 5" HWDP, Drilling Jars, And Flex Collars- Inspect Adjustable Gauge Stabilizer - Drain Mud Motor - Break Off 121/4" PDC Hycalog Bit And Inspect Same 19:30 - 20:30 1.00 DRILL N DFAL INT1 Clear Rig Floor - Bring New 12 1/4" Bit To Rig Floor - Down Load Sperry Sun MWD / LWD Tools 20:30 - 22:00 1.50 DRILL N DFAL INT1 Lay Down And Handle BHA - Break Out And Remove Float Sub - Break Out Adjustable Gauge Stabilizer - Lay Down Sperry Sun MWD / LWD Tools And Pulser - Lay Down Sperry Printed: 9/4/2002 10:55:43 AM Legal Well Name: PSI-1 0 Common Well Name: PSI-10 Spud Date: 8/10/2002 Event Name: DRILL +COMPLETE Start: 8/9/2002 End: 9/3/2002 Contractor Name: NABORS Rig Release: 9/3/2002 Rig Name: NABORS 27ES Rig Number: Date Frorn.-"..ro HoUrs Täsk Códe< ...NPT 8/21/2002 20:30 - 22:00 1.50 DRILL N DFAL INT1 Drill 8" Mud Motor 22:00 - 00:00 2.00 DRILL N DFAL INT1 Pick Up New Sperry Mud Motor And Adjust AKO To 1.15 Deg. - Make Up Adjustable Gauge Stabilizer With Cross Overs - Pick Up New Sperry MWD / LWD Tools, Pulser With Float Sub - Orient MWD To Mud Motor - Make Up New 12 1/4" Hycalog PDC Bit - Initialize Sperry Sun MWD Tools - Change Out Choke Nozzle On MWD Tool 8/22/2002 00:00 - 04:00 4.00 DRILL N DFAL INT1 Hold Pre-Job Safety Meeting - RIH With 8" Flex Drill Collars, Drilling Jars And 5" HWDP From Mast - Continue To RIH With 5" Drill Pipe From Mast Fill Drill Stem As Required To 13 3/8" Casing Shoe - Test Mud Motor And MWD Tools - Continue To RIH Thru Open Hole Section With (NO Problems) To 9,941' - Connect Top Drive Break Circulation And Wash Last Single To Bottom At 9,973' (No Fill) 04:00 - 20:00 16.00 DRILL P INT1 Directional Drill Ahead (Droping Angle) From 9,973' To 10,801' - Weight On Bit 10K To 15K With Pump Rate At 203 Strokes Or 850 GPM - Off Bottom Pump Pressure At 3200 Psi. & On Bottom Pump Pressure At 3425 Psi. - Top Drive RPM At 100- Off Bottom Torque At 21 K & On Bottom Torque At 24K - String Rotating Weight At 215K - With Pump Off Drag Up At 270K And Drag Down At 173K Actual Slide Time = 5.7 Hours Actual Rotating Time = 3.9 Hours 20:00 - 22:00 2.00 DRILL P INT1 Increase In Flow Line Percentage Rate - Pick Up And Observe Well- Gas Breaking Out In Riser But Not Flowing - Start Increase Of Mud Weight With Spike Fluid To 10.3 PPG - Pump A Total Of 10,118 Strokes At 511 GPM - 92 Maximum Gas Units On EPOCH Unit 22:00 - 00:00 2.00 DRILL N DPRB INT1 Open Choke Line HCR Valve To Poor Boy Degasser - Close Annular Element And Hydraulic Operated Choke - Shut In Well Due To Gas Breaking Out At Bell Nipple - Record Drill Pipe And Casing Pressures - Casing Pressure At 70 Psi. And Drill Pipe Pressure At 120 Psi. - Crack Hydraulic Choke And Bring Mud Pump On Line - Reciprocate Drill String Thru Annular Element And Continue To Circulate 10.3 PPG Mud Around Thru Poor Boy Degasser - Pump 5,282 More Strokes To Get 10.3 PPG Mud Around - Hold Drill Pipe Pressure Constant At 268 Psi. - Casing Pressure At 60 Psi. - Gas Cut Mud Coming Out At 8.5 PPG. *NOTE* Notify AOGCC Representive John Crisp Attempt To Notify Anchorage Personal But Unable Due To Phone Outage To Anchorage 8/23/2002 00:00 - 00:30 0.50 DRILL N DPRB INT1 Continue To Circulate Thru Poor Boy Degasser At 4 BPM- Shut Pumps Down Check For Flow Thru Degasser U-Tube (No Flow) - 0 Psi. On Drill Pipe Pressure Gauge (Float In String) And 30 Psi. On Casing Pressure Gauge - Drain BOP Stack And Open Up Annular Element 00:30 - 01 :00 0.50 DRILL N DPRB INT1 Fill Up BOP Stack With Mud And Monitor Well - Gas Cut Mud Breaking Out At Surface 01 :00 - 03:00 2.00 DRILL N DPRB INT1 Reciprocate Drill String And Increase Mud Weight To 10.6 Printed: 9/4/2002 10:55:43 AM Legal Well Name: PSI-1 0 Common Well Name: PSI-10 Spud Date: 8/10/2002 Event Name: DRILL +COMPLETE Start: 8/9/2002 End: 9/3/2002 Contractor Name: NABORS Rig Release: 9/3/2002 Rig Name: NABORS 27ES Rig Number: Date Frorn.,.Tb HOUfS Task COdë ....NPT 8/23/2002 01 :00 - 03:00 2.00 DRILL N DPRB INT1 PPG - Pumping Rate At 9 BPM With 896 Psi. And 65% Flow - At 5,200 Strokes Gas Subsided In Riser - Back Ground Gas At 38 Units And Coming Back 10.6 On Pressurized Scale And 10.1 PPG On Non Pressurized Scale 03:00 - 13:30 10.50 DRILL P INT1 Monitor Well Bore (Static) - Hold Pre-Job Safety Meeting - Obtain New Slow Pump Rates With New Mud - Orient Motor And Directional Drill Ahead From 10,801' To 11,442' - Monitor Well On Connections - Weight On Bit 15K With Pump Rate At 191 Strokes Or 800GPM - Off Bottom Pump Pressure At 3700 Psi. & On Bottom Pump Pressure At 4000 Psi. - Top Drive RPM At 100 - Off Bottom Torque At 14K & On Bottom Torque At 20K - String Rotating Weight At 225K - With Pump Off Drag Up At 290K And Drag Down At 190K Actual Slide Time = 3.07 Hours Actual Rotating Time = 4.39 Hours 13:30 - 15:30 2.00 DRILL P INT1 Circulate 12.6 PPG Hi-Vis Sweep Around Surface To Surface At 800 GPM 15:30 - 16:30 1.00 DRILL P INT1 Monitor Well Bore (Static) - Hold Pre-Job Safety Meeting - POH Slow To 10,506' No Problems - Correct Fluid Displacement For Amount Of Steel Pulled - Pump Dry Job - Blow Down Top Drive 16:30 -19:00 2.50 DRILL P INT1 Continue To POH With 5" Drill Pipe To 6,005' - 13 3/8" Casing Shoe With No Problems 19:00 - 19:30 0.50 DRILL P INT1 Circulate Across Top Of Hole With Trip Tank System And Monitor Returns And Fluids While Service Can-Rig Top Drive, Traveling Blocks And Crown Sheaves 19:30 - 21 :30 2.00 DRILL P INT1 Hold Pre-Job Safety Meeting - RIH From 6,005' - Fill Drill String At 8,819' - Continue To RIH To 11,356' - Connect Top Drive And Break Circulation - Wash And Ream Last Stand To Bottom At 11,442' (No Fill) 21 :30 - 22:30 1.00 DRILL P INT1 Circulate 12.6 PPG Hi-Vis Sweep Followed With 10.6 PPG Mud Around Surface To Surface At 800 GPM 22:30 - 00:00 1.50 DRILL P INT1 Gas Breaking Out In Riser At 10,800 Strokes 3,142 Strokes Before Bottoms Up - Mud Weight Coming Back Gas Cut To 10.2 PPG - Flow Show At 835 GPM Spiked From 84% To 95% - 125 Maximum Units Of Gas Recorded On EPOCH Gas Monitor - Continue To Circulate And Raise Mud Weight To 10.8 PPG 8/24/2002 00:00 - 01 :00 1.00 DRILL P INT1 Continue To Raise Mud Weight To 10.8 PPG - Monitor Well Bore (Static) - Spot 5% Lube Pill On Bottom 01 :00 - 07:30 6.50 DRILL P INT1 Hold Pre-Job Safety Meeting - POH (SLM) With 10 Stands 5" Drill Pipe With No Problems Hole Taking Correct Amount Of Fluid For Steel Displacement - Monitor Well (Static) - Pump Dry Job And Blow Down Top Drive - Continue To POH To 13 3/8" Casing Shoe With No Problems - Shut Down And Observe Well (Static) - POH With 5" Drill Pipe Standing Back In Mast 07:30 - 08:30 1.00 DRILL P INT1 Stand Back 5" HWDP - Hold Pre-Job Safety Meeting - Lay Down 8" Drilling Jars And Flex Drill Collars 08:30 - 09:00 0.50 DRILL P INT1 Down Load Sperry Sun MWD / LWD Tools 09:00 - 10:00 1.00 DRILL P INT1 Pump Fresh Water Thru MWD Tools And Mud Motor - Drain Motor And Remove 12 1/4" PDC Bit - Lay Down MWD Tools Printed: 9/4/2002 10:55:43 AM ) ) Legal Well Name: PSI-1 0 Common Well Name: PSI-10 Spud Date: 8/10/2002 Event Name: DRILL +COMPLETE Start: 8/9/2002 End: 9/3/2002 Contractor Name: NABORS Rig Release: 9/3/2002 Rig Name: NABORS 27ES Rig Number: Date FrÓm ..~..To HoÜrs Task COde NPT [)ëScri þtiOnÓfQpera~ipns 8/24/2002 09:00 - 10:00 1.00 DRILL P INT1 And Mud Motor 10:00 - 10:30 0.50 DRILL P INT1 Clear Rig Floor Of 121/4" Drilling Tools And Equipment 10:30 - 11:00 0.50 CASE P INT1 Hold Pre-Job Safety Meeting - Rig Up And Pull Wear Ring - Install Lower FMC Test Plug - Rig Up BOP Testing Equipment 11 :00 - 12:00 1.00 CASE P INT1 Hold Pre-Job Safety Meeting - Open Doors On Top BOP Gate And Remove Ram Blocks And Change To 9 5/8" - Close Doors 12:00 - 13:00 1.00 CASE P INT1 Hold Pre-Job Safety Meeting - Test Top Gate Door Seals And 135/8 5M Annular To 3,500 Psi. Per AOGCC Regulations After Well Shut In Per AOGCC Representive John Crisp - Rig Down Testing Equipment - Pull Test Plug And Lay Down Test Joint- Test Cement Line Off Critical Path At 3,500 Psi. *NOTE* Weekly BOP TEST Waived Until 9 5/8" Casing In Place And Cemented Per AOGCC Representive John Crisp 13:00 - 15:30 2.50 CASE P INT1 Hold Pre-Job Safety Meeting - Remove Short Set Of Elevator Links - Pick Up And Make Up GBR Franks Fill Up Tool - Install Long Set Of Elevator Links And 350 Ton Elevators - Make Dummy Run With FMC Flutted Hanger With Landing Joint 15:30 - 16:00 0.50 CASE P INT1 Hold Pre-Job Safety Meeting With BP Drilling Forman, Nabors Toolpusher And All Personal Regarding Up Coming Casing Running Operation 16:00 - 00:00 8.00 CASE P INT1 Pick Up 9 5/8" Shoe Track And Float Equipment - Fill With Mud To Check Floats - Continue To RIH With 103 Joints Of 9 5/8" 471b. L-80 Casing Per Program 8/25/2002 00:00 - 02:30 2.50 CASE P INT1 Hold Pre-Job Safety Meeting - RIH With 146 Joints Of 95/8" 471b. L-80 Casing Per Program To13 3/8" Casing Shoe (6,067') 02:30 - 03:30 1.00 CASE P INT1 Insert Franks Fill Up Tool - Break Circulation - Stage Up Pump Rate To 8 BPM - Circulate One Casing Volume With No Losses 635 Psi. At 80 SPM 19 Maximum Units Of Gas On EPOCH Gas Monitor - Up Weight At 270K And Down Weight At 180K 03:30 - 10:00 6.50 CASE P INT1 Continue To RIH With 275 Joints Of 95/8" 471b. L-80 Casing Per Program With (NO LOSSES) - Make Up Space Out Pup & Pick Up Joint 276 - Install FMC Flutted Hanger And Landing Joint - Stab In Franks Fill Up Tool And Break Circulation - Circulate Landing Joint To Bottom At 11,431' And Land Hanger (NO Problems) 10:00 - 12:00 2.00 CASE P INT1 Continue To Circulate And Condition Mud Stage Up Pump Rate To 9.5 BPM At 900 Psi. With Two Mud Pumps - Reduce Volume In Mud System - Hold Pre-Job Safety Meeting Regarding Up Coming Cement Job With All Personal 12:00 - 13:00 1.00 CASE P INT1 Hold Pre-Job Safety Meeting - Shut Down Mud Pumps - Rig Down Franks Casing Fill Up Tool - Install Cement Head Adaptor And Cement Head - Make Up Circulation Hose - Break Circulation 6 BPM At 700 Psi. - Batch Mix 50 BBLS. 12.5 PPG Mud Push And 132 BBLS. 15.8 PPG Class "G" Gasblock Cement 13:00 - 15:30 2.50 CEMT P INT1 Shut Down And Turn Over To Dowell- Pump 5 BBL. CW-100- Test Lines At 3,500 Psi. - Pump 75 BBLS. CW-100 - Pump 50 BBLS. 12.5 PPG. Mud Push XL Spacer - Drop Bottom Plug - Pump 134 BBLS. Batch Mixed 15.8 PPG Class "G" Printed: 9/4/2002 10:55:43 AM ) BP QpE!ra~i()ø~Sl.JrolT8~ry>Repørt Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: PSI-10 PSI-10 DRILL +COMPLETE NABORS NABORS 27ES Start: 8/9/2002 Rig Release: 9/3/2002 Rig Number: Spud Date: 8/10/2002 End: 9/3/2002 Date Frdrrì~Tó HoUrs Task Code NPT Phase p$scripti()hqf OpØr<3tiqps 8/25/2002 13:00 - 15:30 2.50 CEMT P INT1 GASBLOCK Tail Cement Slurry At 6 BPM - Drop Top Plug- Flush Dowell Cement Lines With 10 BBLS. Water - Shut Down And Swap To Rig Pumps For Displacement - Displace With 840 BBLS. Of 10.8 PPG Mud At 12 BPM - Slow Pumps To 2 BPM And Bump Plug With 500 Psi. Above Final Circulation Pressure - Bleed Pressure To 0 Psi. And Check Floats (Floats OK) - Cement In Place At 15:24 Hours 15:30 - 18:00 2.50 CEMT P INT1 Hold Pre-Job Safety Meeting - Rig Down Dowell Cement Head - Back Out 9 5/8" Landing Joint And Lay Down Same - Rig Down Casing Tools And Clear Rig Floor 18:00 - 20:30 2.50 DRILL P PROD1 Hold Pre-Job Safety Meeting - Change Bales To Short Set - Pick Up 5" Drill Pipe Elevators - Latch Up Stand Of 5" HWDP And Install 9 5/8" Pack Off - Test At 5,000 Psi. For 10 Minutes (Test Good) 20:30 - 22:00 1.50 DRILL P PROD1 Hold Pre-Job Safety Meeting - Open Doors On Top BOP Gate And Remove Ram Blocks And Change To 41/2" X 7" Variables - Close Doors 22:00 - 22:30 0.50 DRILL P PROD1 Hold Pre-Job Safety Meeting - Install Upper Test Plug And Rig Up Testing Equipment - Flush Mud Lines With Water - Circulate To Poor Boy Degasser Thru Choke 22:30 - 00:00 1.50 DRILL P PROD1 Hold Pre-Job Safety Meeting - Witness Of BOP Test Waived By AOGCC Inspector John Crisp - Test Annular At 250 Psi. Low And 2,500 Psi. High - Test Upper And Lower Pipe Rams, Blind Rams, Choke Manifold, Floor Safety Valve, Dart Valve, Top Drive Upper And Lower IBOP Valves, Manual And HCR Valves On The Choke And Kill Lines At 250 Psi. Low And 4,000 Psi. High - Test Pit PVT System And H2S And LEL Detectors - Perform Accumulator Test 8/26/2002 00:00 - 02:30 2.50 DRILL P PROD1 Hold Pre-Job Safety Meeting - Continue To Test BOP And Related Equipment *NOTE* Hold Pre-Job Safety Meeting - While Testing BOP Rig Up And Pumped Down 13-3/8" x 9-5/8" Annulus Established Injectivity Rate At 2 BPM With 1,179 Psi. - Rig Up Little Red - Test Lines To 2,500 Psi. Bull Head 133 BBLS. Of Dead Crude Oil Down Annulus To Freeze Protect 02:30 - 03:30 1.00 DRILL P PROD1 Hold Pre-Job Safety Meeting - Rig Down Testing Equipment- Remove Test Plug - Install Short Bowl Protector And Energize Lock Down Studs 03:30 - 07:30 4.00 DRILL P PROD1 Hold Pre-Job Safety Meeting - Bring BHA No.4 - Bit And Tools To Rig Floor - Pick Up And Make Up 81/2" Bit And BHA- Orient MWD/LWD Tools And Initialize Same - Connect Top Drive And Surface Test MWD And Sperry Motor - Hold Pre-Job On Radioactive Source - Install Source And RIH - Continue To Pick Up BHA 07:30 - 09:30 2.00 DRILL P PROD1 Hold Pre-Job Safety Meeting - RIH With BHA No.4 And 5" Drill Pipe From Mast To 5,400' 09:30 - 10:00 0.50 DRILL P PROD1 Break Circulation And Fill Drill String - Service Top Drive, Traveling Blocks, And Crown Sheaves 10:00 -12:30 2.50 DRILL P PROD1 Continue To RIH With 5" Drill Pipe From Mast To 8,332'- Connect Top Drive And Fill Drill String - RIH To 11,264' 12:30 - 14:00 1.50 DRILL P PROD1 Break Circulation - Hold Pre-Job Safety Meeting - Prepare And Printed: 9/4/2002 10:55:43 AM Legal Well Name: PSI-1 0 Common Well Name: PSI-10 Spud Date: 8/10/2002 Event Name: DRILL +COMPLETE Start: 8/9/2002 End: 9/3/2002 Contractor Name: NABORS Rig Release: 9/3/2002 Rig Name: NABORS 27ES Rig Number: Date FrÖht..~...TÖ Hours. Task Codê NPT Phase 8/26/2002 12:30 - 14:00 1.50 DRILL P PROD1 Test 9 5/8" Casing To 3,500 Psi. Hold For 30 Minutes (Test Good) - Bleed Preasure To 0 Psi. 14:00 -15:00 1.00 DRILL P PROD1 Tag Casing Wiper Rubbers At 11,345' - Drill Wiper Rubbers And Tag Float Collar At 11,348' - Drill Cement To 11,390' 15:00 - 16:00 1.00 DRILL P PROD1 Hold Pre-Job Safety Meeting - Swap Out Mud System To 9.0 PPG BaradrilN Mud - Clean Possom Belly And Under Shakers - Continue To Drill Cement And Tag Top Of Float Shoe At 11 ,430' (Bottom At 11 ,432') - Wash And Ream 12 1/4" Rat Hole From 11,432' To 11,442' - Drill 8 1/2" New Hole To 11 ,462' 16:00 - 17:00 1.00 DRILL P PROD1 Circulate Bottoms Up - Verify 9.0 PPG Mud In And Out 17:00 - 17:30 0.50 DRILL P PROD1 Hold Pre-Job Safety Meeting - Pull Bit In 9 5/8" Casing Shoe Closed Pipe Rams And Performed FIT. Strokes Pmp'd Pressure 2 100 psi 4 175 psi 6 225 psi 8 300 psi 10 390 psi 11 450 psi Held Test F/1 0 minutes wi 25 Psi. Pressure Loss. MW 9.0 ppg, Csg Shoe TVD 8,233' Pressure 450 psi = 10.05 PPG. EMW. Bleed Pressure To 0 Psi. - Open Pipe Rams 17:30 - 21 :30 4.00 DRILL P PROD1 Obtain Slow Pump Rates With New 9.0 PPG Mud - Drill Ahead From 11,462' To 11,641' - Weight On Bit 20K To 25K - With Pump Rate At 137 Strokes Or 573 GPM - Off Bottom Pump Pressure At 2200 Psi. & On Bottom Pump Pressure At 2400 Psi. - Top Drive RPM At 100 - Off Bottom Torque At 29K & On Bottom Torque At 26K - String Rotating Weight At 220K - With Pump Off Drag Up At 335K And Drag Down At 165K Actual Rotating Time 3.5 Hours Actual Slide Time At 0.0 Hours 21 :30 - 00:00 2.50 DRILL P PROD1 High Torque - Pump 5% Lube Tex Pill Around (No Help) - Pump Out Of Hole To 9 5/8" Casing Shoe - Mix And Pump EP Mud Lube Pill From Surface To Surface 8/27/2002 00:00 - 01 :00 1.00 DRILL P PROD1 Continue To Pump Weighted "EP" Mud Lube Pill Around While Rotating And Reciprocating Drill String - Up Weight 240K, String Weight 210K, Down Weight 198K - Torque Rotating 25K 01 :00 - 01 :30 0.50 DRILL P PROD1 Wash To Bottom At 11,641' With No Problems 01 :30 - 05:00 3.50 DRILL P PROD1 Drill Ahead From 11,641' To 11,809' - Weight On Bit 20K To 25K - With Pump Rate At 137 Strokes Or 573 GPM - Off Bottom Pump Pressure At 2200 Psi. & On Bottom Pump Pressure At 2400 Psi. - Top Drive RPM At 100 - Off Bottom Torque At 29K & On Bottom Torque At 26K - String Rotating Weight At 220K - With Pump Off Drag Up At 335K And Drag Down At 165K Printed: 9/4/2002 10:55:43 AM '} ) Legal Well Name: PSI-1 0 Common Well Name: PSI-10 Spud Date: 8/10/2002 Event Name: DRILL +COMPLETE Start: 8/9/2002 End: 9/3/2002 Contractor Name: NABORS Rig Release: 9/3/2002 Rig Name: NABORS 27ES Rig Number: Date F rOm~'TO HOUrs Täsk Codé NPT Phase 8/27/2002 01 :30 - 05:00 3.50 DRILL P PROD1 Actual Rotating Time 3.5 Hours Actual Slide Time At 0.0 Hours 05:00 - 06:30 1.50 DRILL P PROD1 Pump Up Survey - Circulate Sweep - Monitor Well Bore (Static) - Spot Logging Pill In Open Hole 06:30 - 07:00 0.50 DRILL P PROD1 Hold Pre-Job Safety Meeting - POH Slow To 9 5/8" Casing Shoe (11 ,431') With "NO" Problems - Up Weight At 420K 07:00 - 07:30 0.50 DRILL P PROD1 Monitor Well Bore (Static) - Pump Dry Job - Drop Rabbit With Slick Line Tail Attached - Blow Down Top Drive 07:30 - 11 :30 4.00 DRILL P PROD1 POH With 5" Drill Pipe Stand Back In Mast 11 :30 - 13:00 1.50 DRILL P PROD1 Hold Pre-Job Safety Meeting - Lay Down 5" HWDP, Drilling Jars, And Flex Drill Collars - Pump Fresh Water Thru Sperry Sun MWD / LWD And Mud Motor 13:00 - 15:00 2.00 DRILL P PROD1 Hold Pre-Job Safety Meeting - Remove Radio Active Sources From Logging Tools - Down Load Data From MWD / LWD And Lay Down - Drain Motor And Break Off 8 1/2" Drill Bit - Lay Down Motor And Clear Rig Floor 15:00 -16:00 1.00 EVAL P PROD1 Hold Pre-Job Safety Meeting - Rig Up Schlumberger Electric Line Services - Make Up Ultra Sonic Imaging Tools 16:00 - 21 :00 5.00 EVAL P PROD1 RIH With USIT Tools To 11,431 (9 5/8" Casing Shoe) - Log From 11,431' To Top Of Cement - POH 21 :00 - 21 :30 0.50 EVAL P PROD1 Hold Pre-Job Safety Meeting - Lay Down USIT Tools And Pick Up Bore Hole Sonic Tools 21 :30 - 00:00 2.50 EVAL P PROD1 RIH With BHS Tools To 11,809' - Log Open Hole Section Up To 9 5/8" Casing Shoe - POH With Electric Line Cable 8/28/2002 00:00 - 01 :00 1.00 EVAL P PROD1 Hold Pre-Job Safety Meeting - Continue To POH With Logging Tools - Lay Down Tools And Rig Down Schlumberger 01 :00 - 01 :30 0.50 EVAL P PROD1 Clear Rig Floor And Clean Up Around Draw Works After Cleaning Project 01 :30 - 03:30 2.00 CASE P COMP Hold Pre-Job Safety Meeting - Rig Up To Run 7" 26 lb. L-80 Liner - Pick Up Shoe Track And Check Floats - Continue To RIH With 11 Joints Of 7" 26 lb. L-80 BTC Mod Casing Per Program - Make Up Pup Joint - Change Elevators To 5" Pick Up Baker Liner Hanger And ZXP Packer With Running Tool - Verify That Liner Wiper Plug In Baker Liner Hanger 03:30 - 04:00 0.50 CASE P COMP Hold Pre-Job Safety Meeting - Rig Down Casing Equipment And Clear Rig Floor 04:00 - 04:30 0.50 CASE P COMP RIH With 1 Stand - Circulate 7" Liner Volume *NOTE* Liner Weight At 14K When Full Of Mud 04:30 - 11 :30 7.00 CASE P COMP Continue To RIH (Slow) With 5" Drill Pipe From Mast To 9 5/8" Casing Shoe - Fill Every Ten Stands *NOTE* Verify Top Of Cement In The 13 3/8" X 20" Annulus - Cement Is At The 4" Outlets On Conductor Casing 11 :30 - 12:30 1.00 CASE P COMP Connect Top Drive And Break Circulation - Circulate And Condition Mud At 3 BPM Stage Pump Rate Up To 6 BPM - Up Weight 245K And Down Weight At 170K 12:30 - 13:00 0.50 CASE P COMP RIH To 11,802' With 7" Liner On 5" Drill Pipe From Mast 13:00 - 13:30 0.50 CASE P COMP Pick Up And Make Up Baker Plug Droping Head - Connect Circulating Lines -Break Circulation And Wash Down Tag Bottom At 11,809' 13:30 -14:15 0.75 CASE P COMP Circulate And Stage Up Pump Rate To 6 BPM With 600 Psi.- Reciprocate 7" Liner While Batch Mixing Cement Printed: 9/4/2002 10:55:43 AM ) ) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 8/28/2002 14:15 - 14:45 14:45 - 15:15 15:15 -15:30 15:30 - 17:00 17:00 - 21 :00 21 :00 - 23:00 23:00 - 00:00 8/29/2002 00:00 - 01 :30 01 :30 - 03:00 03:00 - 07:00 07:00 - 08:30 08:30 - 14:00 14:00 -15:00 15:00 - 16:00 16:00 - 21 :00 21 :00 - 22:00 PSI-10 PSI-10 DRILL +COMPLETE NABORS NABORS 27ES Start: 8/9/2002 Rig Release: 9/3/2002 Rig Number: Spud Date: 8/10/2002 End: 9/3/2002 Hours Task Code- NPT 0.50 CEMT P COMP 0.50 CEMT P COMP 0.25 CEMT P COMP 1.50 CEMT P COMP 4.00 CEMT P COMP 2.00 CEMT P COMP 1.00 CEMT P COMP 1.50 CLEAN P COMP 1.50 CLEAN P COMP 4.00 CLEAN P COMP 1.50 CLEAN P 5.50 CLEAN P COMP COMP 1.00 CLEAN P COMP 1.00 CLEAN P COMP 5.00 CLEAN P COMP 1.00 CLEAN P COMP Shut Down And Turn Over To Dowell - Pump 5 BBL CW-1 00 - Pressure Test Surface Equipment At 3,500 Psi. (Test Good) - Reciprocate Liner - Pump 25 BBLS CW-100 - 30 BBLS 10.0 PPG Mud Push XL Spacer - 30 BBLS 15.8 PPG Class "G" Gas Block Cement Slurry - Shut In Plug Droping Head And Flush Cement Lines Drop Drill Pipe Wiper Dart And Displace With 9.0 PPG BaradrillN Mud At 10 BPM With Rig Pumps - Slow Rate And Observe Latch Up Of Liner Wiper Plug Sheared At 1 ,200 Psi. - Continue To Displace And Bump Plug With 217 BBLS Away - Cement In Place At 15:13 Hours Pressure Up To 3,500 Psi. - Slack Off 20K And Verify That Liner Hanger Set - Bleed Pressure To 0 Psi. And Check Floats (OK) - Rotate 20 Turns The Right And Release Liner - Pressure Up To 1,000 Psi. Pick Up And Unsting Cups - Observe Pressure Drop And Pump 20 BBLS A 10 BPM - Reduce Pump Rate To 3 BPM - Set Down 70K And Set ZXP Packer. Circulate 1.5 Times Annular Vol;ume ( 1 BBL. Cement Back). Hold Pre-Job Safety Meeting - Rig Down Cement Head And Circulating Lines. Hold Pre-Job Safety Meeting - Pump Dry Job - Blow Down Top Drive - POH 1,878' Hold Pre-Job Safety Meeting - Slip And Cut (130 Feet) 1 3/8" Drill Line - Service Top Drive, Crown Sheaves, And Traveling Blocks Continue To POH With Baker Liner Running Tool - Stand 5" Drill Pipe Back In Mast - Clean And Lay Down Running Tool- Pump Fresh Water Thru Kill Line And Choke Manifold To Poor Boy Degasser Hold Pre-Job Safety Meeting - Blow Down Choke Line To Poor Boy Degasser - Rig Up To Run 3 1/2" HWDP Hold Pre-Job Safety Meeting - Make Up 6 1/8" Bit, Cross Overs And Casing 7" Scraper - Pick Up 3 1/2" HWDP - Make Up Cross Overs And 9 5/8" Scraper - Break Circulation And Pump Thru BHA Hold Pre-Job Safety Meeting - RIH With 7" And 9 5/8" Casing Scrapers On 5" Drill Pipe From Mast - Travel Thru Top Of 7" Liner Top At 11,319' With No Problems - Continue To RIH (Slow) Thru Liner Tag Cement At 11,718' Circulate Hole Clean Hold Pre-Job Meeting - Spot Trucks For Displacement - Pump 25 BBL Barazan Spacer, 50 BBLS Hot Diesel, 25 BBLS Barazan Spacer, 50 BBL Dirt Magnet, 25 BBL Hi-Vis Sweep Followed By 8.5 PPG KCL Water At 10 BPM - 108 Final NTU - Lay Down Single Of Drill Pipe And Make Up Head Pin Rig Up And Pressure Test Casing To 4,000 Psi For 30 Minutes (Test Good) Hold Pre-Job Safety Meeting - Pump Dry Job Blow Down Top Drive - POH Standing 28 Stands Of 5" Drill Pipe In Mast Hold Pre-Job Safety Meeting - Continue To POH Laying Down 5" Drill Pipe To BHA Change Slips, Elevators, And Iron Ruffneck Heads To Accept 3 Printed: 9/4/2002 10:55:43 AM ) ") BP (;)Þ~r~~iol1~...$lJrnroarY...RØpOrt Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: PSI-10 PSI-10 DRILL +COMPLETE NABORS NABORS 27ES Date From .;To Hours Task Code NPT Phase 8/29/2002 21 :00 - 22:00 1.00 CLEAN P COMP 22:00 - 22:30 0.50 RUNCOIVP 22:30 - 00:00 1.50 RUNCOIVP 8/3012002 00:00 - 00:30 0.50 RUNCOIVP 00:30 - 01 :30 1.00 RUNCOIVP COMP COMP COMP COMP 01 :30 - 02:30 1.00 RUNCOIVP COMP 02:30 - 18:30 16.00 RUNCOIVP COMP 18:30 - 19:45 1.25 RUNCOIVP COMP 19:45 - 22:30 2.75 RUNCOIVP COMP Start: 8/9/2002 Rig Release: 9/3/2002 Rig Number: Spud Date: 8/10/2002 End: 9/3/2002 D~scriptiorr QfOperati(jrt$ 1/2" Pipe - Lay Down 9 5/8" Casing Scraper And Cross Overs - 13 Joints Of 3 1/2" HWDP - 7" Casing Scraper - Clear Rig Floor Hold Pre-Job Safety Meeting - Rig Up And Pull Short Bowl Protector Hold Pre-Job Safety Meeting - Rig Up Casing Tools To Run Completion Hold Pre-Job Safety Meeting - Continue To Rig Up Equipment To Run Completion Assembly Hold Pre-Job Safety Meeting - RIH With 7" Completion Tail Pipe And Baker Lock Connection Between 7" TC-11 Pup Joints- Pick Up Baker SABL-3 Packer And Polished Bore Receptacle - Make Up HES "R" Nipple Assembly Hold Pre-Job Safety Meeting - Change Eleavtors And Slips To Accept 7 5/8" Tubing - Rig Up Scaffolding For Tong Operator Pick Up And RIH With 277 Joints Of 75/8" 29.70 lb. L-80 STL Tubing Per Well Program - While Monitoring Returns To Trip Tank. Record The Following Up And Down Weights. 3,000 Feet - 130K Up And 125K Down 6,000 Feet -190K Up And 165K Down 9,000 Feet - 255K Up And 190K Down 11 ,288 Feet - 320K Up And 225K Down Hold Pre-Job Safety Meeting - Drop Baker Ball And Rod - Remove 200 Ton 7 5/8" Elevators And Install 5" Drill Pipe Elevators - Pick Up (1) Single Of 5" Drill Pipe And (1) 15' Pup Joint With Cross Overs - Make Up Floor Valve, Head Pin, And Circulating Hose - Rig Up Circle Chart Recorder - Place Baker SABL-3 Packer On Setting Depth @ 11,244' - Wire Line Entry Guide @ 11 ,288' Hold Pre-Job Safety Meeting - Clear Non Essential Personal From Rig Floor During Packer Setting Process - Pressure Up Down Tubing To 500 Psi. And Wait 3 Minutes -Increase Pressure To 1,000 Psi. And Wait 3 Minutes - Increase Pressure To 1,500 Psi. And Wait 3 Minutes - Increase Pressure To 1,750 Psi And Wait 5 Minutes - Pump A Total Of 36 Strokes With Mud Pump - See Reduction On Weight Indicator During Pressure Up Process - Verify That Annulus Full And Static - Slack Off On Completion String (Packer Not Set) With 225K Down Weight - Bleed Pressure To 0 Psi. And Pull String Back Up Hole With 320K Up Weight To Setting Depth - Baker Representive Called And Talked To Baker Engineers Located In Anchorage - Pressure Up To 1,850 Psi. With 40 Strokes On Mud Pump - Wait 5 Minutes And Slack Off On Completion String Packer Not Set - Bleed Pressure To 0 Psi. And Pick Back Up To Setting Depth - Pressure Up To 2,000 Psi. - Wait 5 Minutes And Slack Off Completion String Packer Not Set - Call Anchorage ODE (Walter Quay) And Drilling Superintendent (Mark Stanley) Regarding Packer Printed: 9/4/2002 10:55:43 AM ) Leg al Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date PSI-10 PSI-10 DRILL +COMPLETE NABORS NABORS 27ES 8/30/2002 19:45 - 22:30 F "óm~Tó Hours Task 2.75 RUNCOIVP 22:30 - 00:00 8/31/2002 00:00 - 05:30 05:30 - 07:30 07:30 - 00:00 9/1/2002 00:00 - 02:00 02:00 - 07:00 07:00 - 07:30 1.50 PULL N 5.50 PULL N 2.00 PULL N 16.50 PULL N 2.00 PULL N 5.00 PULL N 0.50 RUNCOI\/N Start: 8/9/2002 Rig Release: 9/3/2002 Rig Number: Spud Date: 8/10/2002 End: 9/3/2002 COMP Setting Problem - Slack String Down 8' Putting Elevators At Floor And Verify That Packer Not Set - Pull Completion String Back To Setting Depth - Pick Completion String Up 25' (320K) And Slack Down (225K) To Packer Setting Depth - Pressure Up To 1,500 Psi. And Hold For 15 Minutes - Slack Off 8' Packer Not Set- Bleed Pressure To 0 Psi. And Shut Down Process Hold Pre-Job Safety Meeting - Rig Down Circulating Hose, Head Pin, And Floor Valve - Lay Down 5" Drill Pipe 15' Pup Joint - POH With 5" Drill Pipe Single - Install 350 Ton Slips- Break Off Cross Over To 7 5/8 Tubing And Lay Down Single Joint Of Drill Pipe - Clear Rig Floor - Wait On Haliburton Slick Line Unit Wait On Slick Line Unit And Tools To Arrive On Location - Hold Pre-Job Safety Meeting - Rig Up Haliburton Slick Line Unit At 02:30 Hours - Make Up Tools - RIH At 02:45 Hours With BallI Rod Retrieving Tool- Work To Get On Rod - POH At 04:15 Hours With Slick Line And Ball / Rod Retrieving Tools (Recovered Ball And Rod) - Lay Down Slick Line Tools At 05:15 Hours And Rig Down Haliburton Unit Hold Pre-Job Safety Meeting - Install Cross Over To 7 5/8" Tubing And Make Up Head Pin - Make Up Circulating Hose And Pump Dry Job - Rig Down Circulating Equipment - Pick Up 200 Ton Eelvators - Rig Up Compensator And Single Joint Elevators POH Laying Down 268 Joints Of 75/8" 29.70 lb. L-80 STL Tubing - While Monitoring Returns To Trip Tank Hold Pre-Job Safety Meeting - Continue To POH Laying Down A Total Of 277 Joints 7 5/8" 29.70 lb. L-80 STL Tubing- Change Eleavtors And Slips To Accept 7" TC-11 Tubing - Rig Down Scaffolding - Lay Down HES "R" Nipple Assembly And Baker Polished Bore Receptacle - Pull Baker SABL-3 Packer To Rig Floor And Inspect Packer Was Found To Be Pinned With 4 Each. Brass Screws And Looked Brand New Also It Never Attempted To Set - Heat Baker Locked Pup Joint TC-11 Connections Below Packer And Break Out Inspect Threads All Okay - Let Connections Cool And Lay Down 7" Completion Tail Pipe - Ship Baker SABL-3 Packer To Shop Look Inside Tail Pipe At "R" Nipple For RBX Nipple Reducer And RHC-M Plug It Was Not Located In "R/I Nipple It Was Found To Be In Baker K-22 Anchor Tubing Seal Nipple Above Baker SABL-3 Packer So The Packer Never Saw Any Pressure - Ship Tail Pipe Assembly To Shop And Disassemble To Place RBX Nipple Reducer And RHC-M Plug In Correct Position - Wait On Completion Tail Pipe And Packer To Be Redressed Hold Pre-Job Safety Meeting - Place Pre Made Up In Shop Completion Assembly NO.1 In Rotary Table - Install Bash Ross Safety Clamp Around Assembly - Remove 7" TC-11 Collar And Clean Threads For Baker Locking - Install Coupling Hand Tight - Pick Up Assembly No.2 SABL-3 Packer And Baker Lock Lower 7/1 TC-11 Pup Joint Pin Threads - Insert Pin Into Coupling And Install Casing Tongs With Intregal Back Up - Attempt To Make Up Connection (Connection Threads DFAL COMP DFAL COMP DFAL COMP DFAL COMP DFAL COMP DFAL COMP DFAL COMP Printed: 9/4/2002 10:55:43 AM ) ) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 9/1/2002 07:00 - 07:30 07:30 - 08:30 08:30 - 09:00 09:00 - 10:00 10:00 - 00:00 9/2/2002 00:00 - 01 :00 01 :00 - 02:30 02:30 - 04:00 04:00 - 06:00 06:00 - 09:00 09:00 - 11 :30 BP OÞE!ratipn~$ Ummf1I"Y;;R~pOrt PSI-10 PSI-10 DRILL +COMPLETE NABORS NABORS 27ES Hours Task Cbdë<NPT 0.50 RUNCONN 1.00 RUNCONN 0.50 RUNCONN 1.00 RUNCONN 14.00 RUNCONN 1.00 RUNCONN 1.50 RUNCONN 1.50 RUNCONN 2.00 RUNCONN 3.00 RUNCONN 2.50 RUNCOrvP DFAL COMP DFAL COMP DFAL COMP DFAL COMP DFAL COMP DFAL COMP DFAL COMP DFAL COMP DFAL COMP DFAL COMP COMP Start: 8/9/2002 Rig Release: 9/3/2002 Rig Number: Spud Date: 8/10/2002 End: 9/3/2002 DesGriþtiþh()tOp~ratidQs Crossed) Attempt To Break Out Connection Nabors Alaska Drilling Floorman Was Injured In Process. See LCIR No. 2002-IR-301966 Shut Down Operation And Have Safety Stand Down With Nabors Drilling And Casing Crews Involved In Incident- Preform Investigation And Identify Causes - Raise Level Of Awareness And Upmost Need For Constant Communication Continue To RIH With 7" Completion Tail Pipe And Baker Lock Connection Between 7" TC-11 Pup Joints- Pick Up Baker SABL-3 Packer And Polished Bore Receptacle - Make Up HES "R" Nipple Assembly Hold Pre-Job Safety Meeting - Change Eleavtors And Slips To Accept 7 5/8" Tubing - Rig Up Scaffolding For Tong Operator Pick Up And RIH With 258 Joints Of 75/8" 29.70 lb. L-80 STL Tubing Per Well Program - While Monitoring Returns To Trip Tank. Record The Following Up And Down Weights. 3,000 Feet - 130K Up And 125K Down 6,000 Feet - 190K Up And 165K Down 9,000 Feet - 255K Up And 190K Down Continue To RIH With A Total Of 277 Joints 7 5/8" 29.70 lb. L-80 STL Tubing Per Well Program To 11,249 Feet - String Weight At 320K Up And 225K Down Hold Pre-Job Safety Meeting - Drop Baker Ball And Rod At 01 :44 Hours - Remove 200 Ton 7 5/8" Elevators And Install 5" Drill Pipe Elevators - Pick Up (1) Single Of 5" Drill Pipe And (1) 15' Pup Joint With Cross Overs - Make Up Floor Valve, Head Pin, And Circulating Hose - Rig Up Circle Chart Recorder - Place Baker SABL-3 Packer On Setting Depth @ 11,244' - Wire Line Entry Guide @ 11,288' Hold Pre-Job Safety Meeting - Clear Non Essential Personal From Rig Floor During Packer Setting Process - At 02:26 Hours Attempt To Pressure Up Down Tubing Ball And Rod Not On Seat - Circulating At 3 BPM With 152 Psi. Ramp Pump Up To 5 BPM With 508 Psi. Trying To Get Ball On Seat (No Good) At This Point 68 BBLS. Pumped - Shut Down For 5 Minutes And Pump Additional 17 BBLS At 03:03 Hours - Shut Down And Stroke Completion String Up On Way Down Open Bleeder - Pump Additional 15 BBLS For A Total Of 100 BBLS - Shut Down At 03:22 Hours - Line Up And Reverse Circulate A Total Of 10 BBLS At 19 Psi. - Line Up Down Tubing And Pump 15 BBLS At 2.6 BPM With 88 Psi. - Shut Down At 03:45 Hours Call Haliburton Slick Line Unit - Pump 6 BBLS. At 2 BPM Every Hour Break Down Circulating Equipment - POH And Install 350 Ton Slips - Break Out And Lay Down Landing Joint - Wait On Slick Line Unit And Tools Hold Pre-Job Safety Meeting - Rig Up Haliburton Slick Line Unit - Make Up Tools And RIH With Impression Block - Tag Rod 2' High - Push Rod To 11,211' Wire Line Measurement - POH And Set Tools Aside Hold Pre-Job Safety Meeting - Pick Up (1) Single Of 5" Drill Printed: 9/4/2002 10:55:43 AM ) ) Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: PSI-10 PSI-10 DRILL +COMPLETE NABORS NABORS 27ES Start: 8/9/2002 Rig Release: 9/3/2002 Rig Number: Spud Date: 8/10/2002 End: 9/3/2002 Date Frbrtï;;;.To Hours Task Code NPT Phase DésÖriptiohofOper~~iqns 9/2/2002 09:00 - 11 :30 2.50 RUNCOrvP COMP Pipe And.(1) 15' Pup Joint With Cross Overs - Make Up Floor Valve, Head Pin, And Circulating Hose - Rig Up Circle Chart Recorder - Place Baker SABL-3 Packer On Setting Depth @ 11,244' - Wire Line Entry Guide @ 11,288' - Pressure Up To 500 Psi - Continue Up To 1,000 Psi And Hold Pressure For 5 Minutes - Increase Pressure To 1,100 Psi. (See Indication Of Packer Setting) Continue To Pressure Up To 1,750 Psi. - Slack Off On Completion String 40K And Continue To Pressure Up To 2,500 Psi. And Hold For 15 minutes - Bleed On Tubing To Pressure To 0 Psi. - Pressure Test Annulus To 1,000 Psi. Hold For 15 Minutes (No Returns From Tubing After Pressure Build Up) - Bleed Pressure Off Annulus - Work To Shear Out Of PBR - Normal Up Weight @ 320K Continue To Pick Up Tubing String To 41 OK To Shear PBR (NO GOOD) - Apply 1,000 Psi. Down Tubing And Shear Off PBR At 400K 11 :30 - 12:00 0.50 RUNCOrvP COMP Hold Pre-Job Safety Meeting - Lay Down Floor Valve, Head Pin, And Circulating Hose (1) Single Of 5" Drill Pipe And (1) 15' Pup Joint With Cross Over 12:00 - 14:00 2.00 RUNCOrvP COMP Hold Pre- Job Safety Meeting - Make Up FMC Tubing Hanger - Install NSCC X 4 1/2" IF Crossover And Pick Up Single Of Drill Pipe - Make Up TIW Valve And Head Pin - Rig Up Manifold For Circle Chart Recorder - Install Circulating Hose - Line Up Equipment To Reverse Circulate Inhibited Sea Water And Diesel - Clear Rig Floor Of Casing Tools, Tongs, And Associated Equipment 14:00 - 17:00 3.00 RUNCOrvP COMP Reverse Circulate 151 Barrels Inhibiated Seawater And 138 Barrels Of Diesel At 3 BPM - U-Tube Annulus To Tubing 17:00 - 17:30 0.50 RUNCOrvP COMP Hold Pre-Job Safety Meeting - Land FMC Tubing Hanger And Energize Lock Down Studs 17:30 - 19:30 2.00 RUNCOrvP COMP Hold Pre-Job Safety Meeting - Record On Pressure Chart The Test On Tubing For 30 Minutes At 4,000 Psi. - Bleed To 2,500 Psi. - Pressure Test Annulus At 4,000 Psi. For 30 Minutes - Bleed Annulus To 0 Psi. And Bleed Tubing To 0 Psi. *NOTE* The AOGCC Plans To Witness A Test After Injection Process Started And Warmed Up. 19:30 - 22:00 2.50 BOPSUR P COMP Hold Pre-Job Safety Meeting - Back Out Land Joint And Break Off Cross Over - Pick Up T-Bar And Install Cameron Two Way Check Valve - RIH With Landing Joint Stop Above Tubing Hanger - Pump Down Kill Line And Landing Joint And Float Out Diesel From BOP Equipment - Close Annular Element And Blow Air Into Kill Line Pushing Fluid Up Landing Joint - Open Annular And Lay Down Landing Joint 22:00 - 00:00 2.00 BOPSURP COMP Nipple Down 13 5/8 5M BOP Stack And Related Equipment 9/3/2002 00:00 - 03:00 3.00 WHSUR P COMP INSTALL ADAPTER FLANGE & TREE 03:00 - 04:00 1.00 WHSUR P COMP TEST ADAPTER FLANGE & TREE TO 5000 PSI. 04:00 - 05:00 1.00 WHSUR P COMP R/U DSM. PULL TWC. INSTALL BPV. 05:00 - 06:00 1.00 WHSUR P COMP N/D SWAB VALVE ON TREE, CLEAN CELLAR AREA, SECURE WELL. RELEASE RIG FROM PSI-10 @ 06:00 HRS. Printed: 9/4/2002 10:55:43 AM ') ) Well: Field: API: Permit: PSI-10 Prudhoe Bay Unit 50-029-23110-00 202-159 Rig Accept: 08/10/02 Rig Spud: 08/10/02 Rig Release: 09/03/02 Drilling Rig: Nabors 27E POST RIG WORK 10/09/02 PULLED BALL & ROD. PULLED 4 1/2" RHC-M PLUG BODY. PULLED 7" REDUCING NIPPLE. DRIFT TBG & TAG FILL W/ 10' LONG 3.5" DMY GN @ 11,680' WLMD. RETRIEVE SAMPLE OF SOFT CEMENT. WELL TO REMAIN SHUT IN. 10/14/02 LOGGED TEMP/PRESSURE AND JEWELRY ON 1ST RIH. TAGGED TD AT 11712 FT MD ON 1ST RIH WITH 1.6875" MAX OD. 2ND RIH : TAGGED TD AT 11709 FT MD WITH 3.375" MAX OD. PERFORATED 11688- 11708 FT MD WITH 33/8" 3406 POWERJETS @ 6 SPF. LEFT WELL SHUT IN - INFORMED DSO. WILL FINISH PERFS TOMORROW. DID NOT PERFORATE THE BOTTOM 10' DUE TO FILL IN WELL. COULD NOT GET ALL THE WAY DOWN. 10/15/02 RIH W/ 3 3/8" HSD, 6 SPF, PJ/ TAGGED TD @ 11709'. PERFORATED 11620'-11666' IN TWO RUNS. RIH W/ PSP STRING. LOGGED STATIC BHP&T @ 11630' MD (8422 TVD), BHP= 3398.2 PSI, BHT= 165.9 DEGF. POOH, RDMO, LEFT WELL SHUT IN, NOTIFIED DSO OF STATUS. JOB COMPLETE, WELL READY TO POP. 11/11/02 T/I/0=850/0+/350 MITIA TO 2100 PSI PASSED (AOGCC WITNESSED, JEFF JONES); INITIAL IA FL AT SURFACE. MITIA LOST 5 PSI IN THE FIRST 15 MINUTES AND 5 PSI IN THE SECOND 15 MINUTES FOR A TOTAL OF 10 PSI IN 30 MINUTES. PUMPED 3 BBLS OF 60/40 METHANOL DOWN THE IA. FINAL WHP'S = 850/300/350. ') AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITVE Re: Distribution of Survey Data for Well PSI-10 GYRO Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey Projected Survey: 0.00' MD , M D (if applicable) 0.00 I MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) ) a ~~ )-5{ 05-0ct-02 RECE\VED OCT 0 9 2002 AlasKa ar. & Gas Cons. Commi88ion Andø8ge Sperry-Sun Drilling Services North Slope Alaska BPXA Lisburne PSI (East Dock), Slot PSI slot J PSI-10 Gyro Job No. AKF022135, Surveyed: 27 August, 2002 Survey Report 1 October, 2002 Your Ref: API 500292311000 Surface Coordinates: 5966189.90 N, 708081.03 E (70018' 39.5321" N, 148018'49.2857" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Surface Coordinates relative to Project H Reference: 966189.90 N, 208081.03 E (Grid) Surface Coordinates relative to Structure: 141.59 N, 324.07 E(True) Kelly BushIng: SO.45ft above Mean Sea Level Elevation relative to Project V Reference: 50.45ft ElevatIon relative to structure: 50.45ft "i....~r"\I-!!iU" q'AI~\L;1~.~ SJ¡:RVICaS A Halliburton Company ) :.:: \J r~VE ~. - Survey Ref: svy11268 Sperry-Sun Drilling Services Survey Report for Lisburne PSI (East Dock) .. PSI-10 Gyro Your Ref: API 500292311000 Job No. AKF022135, Surveyed: 27 August, 2002 ): t:! ,\, , ! -- V'-: ... í ~ I ,...' BPXA North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 0.00 0.000 0.000 -50.45 0.00 O.OON O.OOE 5966189.90 N 708081.03 E 0.00 Tolerable Gyro 159.00 0.500 98.000 108.55 159.00 0.10S 0.69E 5966189.82 N 708081.72 E 0.314 ~0.38 252.00 0.500 50.000 201.54 251.99 0.11 N 1.40 E 5966190.05 N 708082.43 E 0.437 -0.49 350.00 1.500 3.000 299.53 349.98 1.66 N 1.79 E 5966191.61 N 708082.78 E 1.240 0.75 440.00 2.350 356.000 389.48 439.93 4.68N 1.73 E 5966194.63N 708082.63 E 0.978 3.52 543.00 3.800 354.000 492.33 542.78 10.18 N 1.22 E 5966200.11 N 708081.97 E ~ 1.411 8.72 716.00 6.500 358.000 664.61 715.06 25.67 N 0.28 E 5966215.57 N 708080.60 E 1.573 23.16 908.00 8.300 350.000 855.01 905.46 50.18 N 2.50W 5966239.99 N 708077.14 E 1.078 46.57 All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to PSI slot J. Northings and Eastings are relative to PSI slot J. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from PSI slot J and calculated along an Azimuth of 335.080° (True). Magnetic Declination at Surface is 26.354°(08-Aug-02) Based upon Minimum Curvature type calculations, at a Measured Depth of 908.00ft., The Bottom Hole Displacement is 50.25ft., in the Direction of 357.144° (True). Survey too/prOgram for PS/-10 Gvro ",.--.... From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth (ft) (ft) ~ Survey Tool Description 0.00 0.00 908.00 905.46 Tolerable Gyro 1 October, 2002 - 16:19 Page 20f2 DrillQuest 3.03.02.002 ) ) c;{ CQ- /5~ 05-0ct-02 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITVE Re: Distribution of Survey Data for Well PSI-10 Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey Projected Survey: 0.00' MD I M D (if applicable) 11,809.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager RECEIVED Attachment(s) OCT 0 9 2002 AlI8ka OH & Gas Cons. Commi88ion And10rage Sperry-Sun Drilling Services North Slope Alaska . BPXA Lisburne PSI (East Dock), Slot PSI slot J PSI-10 Job No. AKZZ22135, Surveyed: 27 August, 2002 Survey Report 1 October, 2002 Your Ref: API 500292311000 Surface Coordinates: 5966189.90 N, 708081.03 E (70018' 39.5321" N, 148018'49.2857" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Surface Coordinates relative to Project H Reference: 966189.90 N, 208081.03 E (Grid) Surface Coordinates relative to Structure: 141.59 N, 324.07 E(True) Kelly Bushing: SO. 45ft above Mean Sea Level Elevation relative to Project V Reference: 50. 45ft Elevation relative to Structure: 50. 45ft .i.'~~I.... .'r'y-SU" -=-'R I L L1N q¡ .-, ~ A VIt:o En,; A Halliburton Company D-:Fl\ 'T1VE .~ .~ Survey Ref: svy11323 Sperry-Sun Drilling Services Survey Report for Lisburne PSI (East Dock) - PSI-10 )E '-¡'~¥"ìV- Your Ref: API 500292311000 Job No. AKZZ2213S, Surveyed: 27 August, 2002 - .. - ¡ :. :;; . usa BPXA North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft) 908.00 8.300 350.000 855.01 905.46 50.18 N 2.50W 5966239.99 N 708077.14 E 46.57 AK-6 BPJFR-AK 1 041 .62 11.110 341.000 986.71 1037.16 71.86 N 8.37W 5966261.50 N 708070.67 E 2.384 68.70 1134.60 11.310 341.300 1077.92 1128.37 88.97 N 14.21 W 5966278.44 N 708064.36 E 0.224 86.67 1227.36 12.660 342.090 1168.66 1219.11 107.25 N 20.25 W 5966296.55 N 708057.81 E 1 .466 105.80 1323.47 16.110 344.890 1261.74 1312.19 130.16 N 26.97 W 5966319.26 N 708050.46 E 3.661 129.40 1414.56 18.220 341.780 1348.77 1399.22 155.89 N 34.72W 5966344.77 N 708042.01 E 2.525 156.00 ~ 1509.77 20.270 342.940 1438.65 1489.10 185.80 N 44.21 W 5966374.40 N 708031.69 E 2.190 187.13 1603.41 20.330 344.980 1526.48 1576.93 217 .01 N 53.19 W 5966405.36 N 708021.85 E 0.758 219.22 1694.97 17.840 344.730 1613.00 1663.45 245.91 N 61.00 W 5966434.03 N 708013.24 E 2.721 248.72 1790.16 17.780 347.760 1703.63 1754.08 274.18 N 67.92 W 5966462.09 N 708005.53 E 0.976 277.27 1883.92 18.470 347.560 1792.74 1843.19 302.67 N 74.16 W 5966490.40 N 707998.51 E 0.739 305.74 1977.81 19.790 349.010 1881.44 1931.89 332.80 N 80.39 W 5966520.35 N 707991.45 E 1.494 335.69 2070.43 24.560 348.580 1967.19 2017.64 367.08 N 87.20 W 5966554.42 N 707983.69 E 5.153 369.65 2104.68 26.690 348.880 1998.06 2048.51 381.61 N 90.09 W 5966568.86 N 707980.40 E 6.230 384.04 2133.32 28.150 349.230 2023.49 2073.94 394.56 N 92.59 W 5966581.74 N 707977.54 E 5.129 396.84 2162.50 29.560 348.490 2049.04 2099.49 408.37 N 95.32 W 5966595.47 N 707974.43 E 4.985 410.51 2254.86 31.710 346.630 2128.51 2178.96 454.32 N 105.48 W 5966641.12 N 707963.01 E 2.544 456.46 2350.69 33.760 342.070 2209.13 2259.58 504.17 N 119.50 W 5966690.56 N 707947.60 E 3.345 507.58 2441.62 34.71 0 338.080 2284.31 2334.76 552.23 N 136.95 W 5966738.12 N 707928.83 E 2.680 558.52 2536.65 34.840 334.780 2362.38 2412.83 601.89 N 158.62 W 5966787.17 N 707905.80 E 1.985 612.69 2630.67 35.490 335.730 2439.24 2489.69 651.07 N 181.28 W 5966835.70 N 707881.78 E 0.904 666.83 2725.72 38.4 70 335.210 2515.16 2565.61 703.07 N 205.02 W 5966887.02 N 707856.61 E 3.152 724.00 2820.49 40.690 333.080 2588.20 2638.65 757.39 N 231.37 W 5966940.59 N 707828.76 E 2.745 784.37 '--' 2913.59 43.010 330.740 2657.55 2708.00 812.16 N 260.64 W 5966994.53 N 707797.99 E 3.003 846.37 3009.12 45.090 329.070 2726.21 2776.66 869.62 N 293.96 W 5967051.04 N 707763.09 E 2.493 912.51 3103.19 48.370 329.520 2790.68 2841 .13 928.50 N 328.92 W 5967108.93 N 707726.51 E 3.504 980.65 3197.95 51.260 332.170 2851.82 2902.27 991.73 N 364.15 W 5967171.15 N 707689.54 E 3.723 1052.83 3288.98 52.820 333.720 2907.82 2958.27 1055.64 N 396.78 W 5967234.14 N 707655.15 E 2.177 1124.54 3384.19 52.850 334.210 2965.34 3015.79 1123.82 N 430.08 W 5967301.37 N 707619.97 E 0.411 1200.40 3479.48 52.870 335.300 3022.87 3073.32 1192.52 N 462.48 W 5967369.15 N 707585.69 E 0.912 1276.36 3572.69 53.220 335.740 3078.91 3129.36 1260.31 N 493.34 W 5967436.06 N 707552.96 E 0.532 1350.84 3666.73 54.720 336.170 3134.22 3184.67 1329.76 N 524.32 W 5967504.62 N 707520.06 E 1.637 1426.88 3760.46 53.280 335.750 3189.31 3239.76 1399.01 N 555.21 W 5967572.99 N 707487.27 E 1.579 1502.70 3854.68 52.810 335.520 3245.96 3296.41 1467.60 N 586.27 W 5967640.69 N 707454.32 E 0.536 1577.99 3948.51 50.320 334.250 3304.28 3354.73 1534.15N 617.45 W 5967706.35 N 707421.31 E 2.858 1651.48 1 October, 2002 - 16:20 Page 2 of6 DrillQuest 3.03.02.002 Sperry-Sun Drilling Services ) :F1NIT 'V': Survey Report for Lisburne PSI (East Dock) - PSI-10 Your Ref: API 500292311000 Job No. AKZZ22135, Surveyed: 27 August, 2002 BPXA North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 4041.06 49.560 332.790 3363.85 3414.30 1597.55 N 649.03 W 5967768.85 N 707387.98 E 1 .460 1722.28 4136.65 50.210 333.970 3425.44 3475.89 1662.90 N 681.78 W 5967833.27 N 707353.43 E 1.163 1795.35 4231.14 50.120 333.290 3485.97 3536.42 1727.91 N 714.01 W 5967897.36 N 707319.42 E 0.561 1867.88 4320.49 50.270 335.150 3543.17 3593.62 1789.71 N 743.86 W 5967958.31 N 707287.87 E 1.608 1936.51 4415.12 51.070 335.210 3603.14 3653.59 1856.15 N 774.58 W 5968023.87 N 707255.31 E 0.847 2009.71 4508.40 51 .820 335.990 3661.28 3711.73 1922.58 N 804.72 W 5968089.44 N 707223.35 E 1.036 2082.65 "-'" 4604.26 50.690 333.920 3721.28 3771.73 1990.31 N 836.35 W 5968156.27 N 707189.85 E 2.056 2157.41 4699.90 50.150 333.040 3782.22 3832.67 2056.27 N 869.26 W 5968221.29 N 707155.13 E. 0.906 2231.09 4792.59 50.540 333.750 3841.37 3891.82 2120.07 N 901.22 W 5968284.19 N 707121.41 E 0.724 2302.42 4887.20 51 .000 333.260 3901.20 3951.65 2185.66 N 933.92 W 5968348.84 N 707086.91 E 0.630 2375.68 4980.17 51.620 334.400 3959.32 4009.77 2250.79 N 965.92 W 5968413.06 N 707053.12 E 1.167 2448.22 5073.79 52.630 335.400 4016.80 4067.25 2317.71 N 997.26 W 5968479.09 N 707019.93 E 1.369 2522.12 5163.40 53.330 335.460 4070.75 4121.20 2382.78 N 1027.01 W 5968543.31 N 706988.39 E 0.783 2593.67 5258.43 52.510 332.380 4128.06 4178.51 2450.86 N 1060.32 W 5968610.44 N 706953.21 E 2.726 2669.45 5351.67 52.430 332.340 4184.86 4235.31 2516.37 N 1094.62 W 5968674.97 N 706917.10 E 0.092 2743.31 5447.68 53.070 332.930 4242.97 4293.42 2584.24 N 1129.75 W 5968741.84 N 706880.11 E 0.827 2819.66 5541.24 52.670 333.260 4299.45 4349.90 2650.76 N 1163.51 W 5968807.40 N 706844.52 E 0.512 2894.21 5634.26 53.480 334.130 4355.33 4405.78 2717.42 N 1196.46 W 5968873.12 N 706809.74 E 1.148 2968.55 5729.17 51.220 331.790 4413.31 4463.76 2784.35 N 1230.59 W 5968939.08 N 706773.76 E 3.079 3043.63 5823.13 50.080 332.390 4472.88 4523.33 2848.55 N 1264.60 W 5969002.32 N 706737.98 E 1.310 3116.19 5916.22 50.400 333.450 4532.42 4582.87 2912.27 N 1297.18 W 5969065.10 N 706703.66 E 0.940 3187.69 6011.98 50.890 332.840 4593.14 4643.59 2978.32 N 1330.63 W 5969130.21 N 706668.39 E 0.710 3261.70 6110.66 51.330 332.250 4655.10 4705.55 3046.48 N 1366.04 W 5969197.36 N 706631.10 E 0.645 3338.43 ~ 6209.31 51.130 331.410 4716.87 4767.32 3114.28 N 1402.35 W 5969264.13 N 706592.93 E 0.694 3415.22 6304.83 51.260 331.520 4776.73 4827.18 3179.68 N 1437.91 W 5969328.51 N 706555.57 E 0.163 3489.50 6397.45 50.170 331.480 4835.38 4885.83 3242.68 N 1472.11 W 5969390.54 N 706519.63 E 1.177 3561.05 6490.91 49.860 331 .220 4895.43 4945.88 3305.52 N 1506.45 W 5969452.41 N 706483.57 E 0.394 3632.51 6583.71 50.100 332.560 4955.11 5005.56 3368.20 N 1539.93 W 5969514.14 N 706448.37 E 1.136 3703.4 7 6673.80 50.640 333.620 5012.57 5063.02 3430.07 N 1'571.33 W 5969575.12 N 706415.26 E 1.086 3772.81 6768.18 50.630 335.030 5072.43 5122.88 3495.83 N 1602.94 W 5969639.98 N 706381.84 E 1.155 3845.77 6862.56 51.270 337.280 5131.90 5182.35 3562.87 N 1632.56 W 5969706.16 N 706350.37 E 1.972 3919.04 6956.61 55.030 339.280 5188.30 5238.75 3632.78 N 1660.38 W 5969775.28 N 706320.63 E 4.345 3994.16 7051.98 54.960 340.660 5243.01 5293.46 3706.17 N 1687.13 W 5969847.90 N 706291.85 E 1.187 4071.99 7146.06 54.430 340.120 5297.38 5347.83 3778.49 N 1712.90 W 5969919.48 N 706264.09 E 0.733 4148.44 7241.58 53.460 339.980 5353.60 5404.05 3851.08 N 1739.25 W 5969991.31 N 706235.74 E 1.022 4225.37 1 October, 2002 - 16:20 Page 3 of6 DriJ/Quest 3.03.02.002 Sperry-Sun Drilling Services Survey Report for Lisburne PSI (East Dock) - PSI-10 Your Ref: API 500292311000 Job No. AKZZ22135, Surveyed: 27 August, 2002 BPXA North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Inct. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft) 7335.43 53.600 339.290 5409.38 5459.83 3921.83 N 1765.51 W 5970061.31 N 706207.53 E 0.610 4300.60 7431.04 53.000 337.900 5466.52 5516.97 3993.20 N 1793.48 W 5970131.87 N 706177.59 E 1.324 4377.11 7523.38 54.980 334.680 5520.82 5571.27 4061.56 N 1823.53 W 5970199.38 N 706145.66 E 3.543 4451.77 7617.72 54.830 333.820 5575.06 5625.51 4131.09 N 1857.07 W 5970267.94 N 706110.21 E 0.763 4528.95 7712.08 54.300 334.580 5629.77 5680.22 4200.30 N 1890.53 W 5970336.21 N 706074.84 E 0.864 4605.82 5684.69 5735.14 4268.06 N 1922.98 W 5970403.04 N 706040.53 E ~ 7805.15 53.360 334.240 1.052 4680.95 7899.17 53.360 335.700 5740.81 5791.26 4336.42 N 1954.90 W 5970470.49 N 706006.73 E 1.246 4756.38 7993.48 53.380 336.730 5797.08 5847.53 4405.67 N 1985.42 W 5970538.87 N 705974.30 E 0.877 4832.05 8085.92 52.980 336.860 5852.48 5902.93 4473.69 N 2014.58 W 5970606.05 N 705943.27 E 0.447 4906.02 8180.05 53.230 335.650 5908.99 5959.44 4542.59 N 2044.89 W 5970674.08 N 705911.06 E 1.062 4981.28 8272.99 53.650 335.040 5964.35 6014.80 4610.44 N 2076.03 W 5970741.04 N 705878.05 E 0.694 5055.93 8366.75 53.840 336.150 6019.80 6070.25 4679.29 N 2107.27 W 5970809.00 N 705844.91 E 0.976 5131.53 8460.50 53.590 335.880 6075.28 6125.73 4748.33 N 2137.99 W 5970877.17 N 705812.29 E 0.354 5207.09 8552.77 53.830 335.830 6129.89 6180.34 4816.20 N 2168.41 W 5970944.16 N 705780.00 E 0.264 5281.46 8648.60 54.180 334.280 6186.21 6236.66 4886.49 N 2201.11 W 5971013.53 N 705745.37 E 1.359 5358.99 8742.49 55.010 333.030 6240.61 6291.06 4955.07 N 2235.08 W 5971081.13 N 705709.52 E 1.400 5435.49 8834.80 54.720 333.250 6293.74 6344.19 5022.41 N 2269.18 W 5971147.51 N 705673.56 E 0.370 5510.94 8929.18 54.560 333.150 6348.35 6398.80 5091.11 N 2303.89 W 5971215.22 N 705636.96 E 0.190 5587.86 9022.68 54.950 333.020 6402.31 6452.76 5159.20 N 2338.45 W 5971282.33 N 705600.52 E 0.432 5664.18 9117.89 54.730 333.560 6457.14 6507.59 5228.74 N 2373.44 W 5971350.86 N 705563.62 E 0.518 5741.98 9212.69 54.300 333.500 6512.17 6562.62 5297.84 N 2407.85 W 5971418.98 N 705527.31 E 0.457 5819.14 ;<1--' 9305.56 54.090 333.560 6566.50 6616.95 5365.26 N 2441.42 W 5971485.45 N 705491.89 E 0.232 5894.43 9399.52 53.810 333.710 6621.80 6672.25 5433.32 N 2475.15 W 5971552.56 N 705456.28 E 0.325 5970.38 '~ 9492.87 54.050 333.450 6676.76 6727.21 5500.90 N 2508.73 W 5971619.17 N 705420.84 E 0.342 6045.81 9579.27 54.130 334.030 6727.43 6777.88 5563.65 N 2539.69 W 5971681.05 N 705388.16 E 0.552 6115.76 9678.88 53.900 333.030 6785.96 6836.41 5635.80 N 2575.61 W 5971752.17 N 705350.25 E 0.845 6196.34 9772.34 52.350 332.400 6842.04 6892.49 5702.25 N 2609.88 W 5971817.64 N 705314.15 E 1.744 6271.03 9864.77 50.180 332.140 6899.87 6950.32 5766.06 N 2643.43 W 5971880.51 N 705278.85 E 2.358 6343.04 9958.88 48.850 331.750 6960.97 7011.42 5829.23 N 2677.09 W 5971942.72 N 705243.45 E 1 .448 6414.51 10052.61 46.140 331.160 7024.30 7074.75 5889.93 N 2710.10 W 5972002.48 N 705208.77 E 2.928 6483.46 10146.74 43.340 331.210 7091.15 7141.60 5947.98 N 2742.03 W 5972059.62 N 705175.25 E 2.975 6549.56 10241.27 42.840 331.340 7160.19 7210.64 6004.61 N 2773.07 W 5972115.36 N 705142.65 E 0.537 6614.00 10334.59 40.940 331.740 7229.65 7280.10 6059.38 N 2802.76 W 5972169.30 N 705111.45 E 2.056 6676.18 10428.25 38.420 331.820 7301.73 7352.18 6112.07 N 2831.04 W 5972221.18 N 705081.72 E 2.691 6735.88 10523.55 36.170 331.920 7377.54 7427.99 6162.99 N 2858.26 W 5972271.33 N 705053.10 E 2.362 6793.53 1 October, 2002 - 16:20 Page 4 of6 DrillQuest 3.03.02.002 Sperry-Sun Drilling Services ) EC.'\JfTfVE Survey Report for Lisburne PSI (East Dock) - PSI-10 Your Ref: API 500292311000 Job No. AKZZ22135, Surveyed: 27 August, 2002 BPXA North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 10617.73 34.650 333.940 7454.30 7504.75 6211.57 N 2883.11 W 5972319.20 N 705026.92 E 2.037 6848.06 10711.86 34.220 333.500 7531.93 7582.38 6259.29 N 2906.67 W 5972366.25 N 705002.04 E 0.528 6901.27 10806.07 32.460 333.920 7610.64 7661.09 6305.71 N 2929.61 W 5972412.02 N 704977.82 E 1.884 6953.03 10900.34 28.700 333.110 7691.78 7742.23 6348.64 N 2950.98 W 5972454.33 N 704955.28 E 4.012 7000.96 10992.91 25.430 334.400 7774.20 7824.65 6386.40 N 2969.62 W 5972491.56 N 704935.59 E 3.589 7043.06 6422.08 N 2986.65 W 5972526.76 N '-' 11088.51 23.440 334.580 7861.24 7911.69 704917.58 E 2.083 7082.60 11182.76 21 .660 334.060 7948.28 7998.73 6454.66 N 3002.31 W 5972558.89 N 704901.02 E 1.900 7118.74 11278.36 19.760 333.760 8037.69 8088.14 6485.02 N 3017.18 W 5972588.83 N 704885.32 E 1.991 7152.54 11366.07 18.740 333.500 8120.50 8170.95 6510.93 N 3030.02 W 5972614.37 N 704871.77 E 1.167 7181.45 11460.01 17.570 336.130 8209.76 8260.21 6537.40 N 3042.49 W 5972640.49 N 704858.57 E 1.520 7210.71 11551.30 17.000 336.170 8296.93 8347.38 6562.21 N 3053.46 W 5972664.98 N 704846.92 E 0.625 7237.83 11645.55 16.620 336.810 8387.15 8437.60 6587.20 N 3064.33 W 5972689.67 N 704835.36 E 0.448 7265.08 11721.15 16.270 337.340 8459.66 8510.11 6606.91 N 3072.67 W 5972709.14 N 704826.4 7 E 0.504 7286.47 11809.00 16.270 337.340 8543.99 8594.44 6629.63 N 3082.15 W 5972731.58 N 704816.37 E 0.000 7311.06 Projected Survey All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to PSI slot J. Northings and Eastings are relative to PSI slot J. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from PSI slot J and calculated along an Azimuth of 335.080° (True). -- Magnetic Declination at Surface is 26.354°(08-Aug-02) Based upon Minimum Curvature type calculations, at a Measured Depth of 11809.00ft., The Bottom Hole Displacement is 7311.06f1., in the Direction of 335.066° (True). .~ 1 October, 2002 - 16:20 Page 50f6 DrillQuest 3.03.02.002 Sperry-Sun Drilling Services Survey Report for Lisburne PSI (East Dock) - PSI-10 Your Ref: API 500292311000 Job No. AKZZ22135,Surveyed: 27 Augu~;t, 2002 JEF'NIT'V~ BPXA North Slope Alaska Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 11809.00 8594.44 6629.63 N 3082.15 W Projected Survey ~ Survey tool program for PSI-10 From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth (ft) (ft) Survey Tool Description 0.00 908.00 0.00 908.00 905.46 11809.00 905.46 Tolerable Gyro(PSI-10 Gyro) 8594.44 AK-6 BP _IFR-AK(PSI-10) .~. ~ 1 October, 2002 - 16:20 Page 60f6 DrillQuest 3.03.02.002 ') AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well PSI-10 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey Projected Survey: 0.00 I MD 'MD (if applicable) 11,809.00 I MD ) ~Od--}51 05-0ct-02 Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) RECEIVED OCT 0 9 200, Alaska OR & Gas Cons. Commi88ion Ancbor8ge Sperry-Sun Drilling Services North Slope Alaska BPXA Lisburne PSI (East Dock), Slot PSI slot J PSI-10 MWD Job Ho. AKMW22135, Surveyed: 8 August, 2002 Survey Report 1 October, 2002 Your Ref: API 500292311000 Surface Coordinates: 5966189.90 H, 708081.03 E (70018' 39.5321H H, 148018' 49.2857H W) Grid Coordinate System: HAD27 Alaska State Planes, Zone 4 '~/ Surface Coordinates relative to Project H Reference: 966189.90 H, 208081.03 E (Grid) Surface Coordinates relative to Structure: 141.59 H, 324.07 E(True) Kelly Bushing: 60.46ft above Mean Sea Level Elevation relative to Project V Reference: 50.45ft Elevation re/ativeto Structure: 50. 45ft !!I~".'.'.."Y-SU" DRn...LI~G ."'.SE=À"'C.Nes A Halliburton Company Survey Ref: svy11324 Sperry-Sun Drilling Services SUlVey Report for Lisburne PSI (East Dock) - PSI-10 MWD Your Ref: API 600292311000 Job No. AKMW2213S, Surveyed: B Augu$t, 2002 BPXA North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 908.00 8.300 350.000 855.01 905.46 50.18 N 2.50W 5966239.99 N 708077.14 E 46.57 MWD Magnetic 1 041 .62 11.110 341.690 986.71 1037.16 71.91 N 8.22W 5966261.55 N 708070.82 E 2.345 68.68 1134.60 11.310 341.600 1077.92 1128.37 89.07 N 13.92 W 5966278.55 N 708064.65 E 0.216 86.64 1227.36 12.660 342.430 1168.65 1219.10 107.39 N 19.86 W 5966296.70 N 708058.21 E 1 .467 105.76 1323.47 16.110 345.300 1261.74 1312.19 130.33 N 26.42 W 5966319.45 N 708051.01 E 3.664 129.33 1414.56 18.220 341.880 1348.77 1399.22 156.10 N 34.06 W 5966344.99 N 708042.66 E 2.567 155.91 1509.77 20.270 343.100 1438.65 1489.10 186.03 N 43.48 W 5966374.65 N 708032.41 E 2.194 187.03 1603.41 20.330 344.820 1526.48 1576.93 217.24 N 52.46 W 5966405.61 N 708022.57 E 0.640 219.12 1694.97 17 .840 344.730 1613.00 1663.45 246.13 N 60.32 W 5966434.26 N 708013.92 E 2.720 248.63 1790.16 17.780 347.440 1703.63 1754.08 274.38 N 67.32 W 5966462.31 N 708006.13 E 0.873 277.20 1883.92 18.4 70 347.380 1792.74 1843.19 302.85 N 73.68 W 5966490.59 N 707998.99 E 0.736 305.70 1977.81 19.790 349.070 1881.44 1931.89 332.97 N 79.94 W 5966520.53 N 707991.89 E 1.524 335.65 2070.43 24.560 348.400 1967.18 2017.63 367.24 N 86.79 W 5966554.59 N - 707984.10 E 5.157 369.62 2104.68 26.690 348.570 1998.06 2048.51 381.75 N 69.74 W ,5966569.02 N 707980.74 E 6.223 384.02 2133.32 28.150 349.010 2023.49 2073.94 394.69 N 92.31 W 5966581.88 N 707977.82 E 5.147 396.84 2162.50 29.560 348.600 2049.04 2099.49 408.50 N 95.04 W 5966595.61 N 707974.71 E 4.879 410.52 2254.86 31.710 346.930 2128.51 2178.96 454.49 N 105.03 W 5966641.30 N 707963.44 E 2.503 456.43 2350.69 33.760 342.360 2209.13 2259.58 504.41 N 118.80 W 5966690.82 N 707948.30 E 3.349 507.50 2441.62 34.710 338.120 2284.31 2334.76 552.52 N 136.11 W 5966738.43 N 707929.66 E 2.823 558.43 2536.65 34.840 334.790 2362.38 2412.83 602.19 N 157.76 W 5966787.49 N 707906.65 E 2.003 612.59 2630.67 35.490 336.130 2439.24 2489.69 651.45 N 180.24 W 5966836.10 N 707882.81 E 1.073 666.74 2725.72 38.4 70 335.150 2515.16 2565.61 703.52 N 203.84 W 5966887.50 N 707857.78 E 3.196 723.90 2820.49 40.690 333.170 2588.20 2638.65 757.84 N 230.17 W 5966941.07 N 707829.95 E 2.694 784.27 2913.59 43.010 331.320 2657.55 2708.00 812.79 N 259.11 W 5966995.20 N 707799.49 E 2.822 846.30 3009.12 45.090 329.660 2726.21 2776.66 870.58 N 291.84 W 5967052.06 N 707765.18 E 2.490 912.49 3103.19 48.370 330.250 2790.68 2841.13 929.87 N 326.12 W 5967110.37 N 707729.27 E 3.517 980.71 3197.95 51.260 333.480 2851.83 2902.28 993.70 N 360.21 W 5967173.24 N 707693.42 E 4.010 1052.96 3288.98 52.820 334.320 2907.82 2958.27 1058.16 N 391.78 W 5967236.80 N 707660.08 E 1.862 1124.72 3384.19 52.850 333.600 2965.34 3015.79 1126.33 N 425.09 W 5967304.02 N 707624.90 E 0.603 1200.57 3479.48 52.870 333.800 3022.87 3073.32 1194.43 N 458.74 W 5967371.16 N 707589.37 E 0.169 1276.51 3572.69 53.220 334.910 3078.91 3129.36 1261.57 N 490.98 W 5967437.38 N 707555.29 E 1.023 1350.99 3666.73 54.720 335.860 3134.22 3184.67 1330.71 N 522.65 W 5967505.62 N 707521.71 E 1.792 1427.04 3760.46 53.280 335.300 3189.31 3239.76 1399.76 N 553.99 W 5967573.77 N 707488.47 E 1.611 1502.86 3854.68 52.810 335.360 3245.96 3296.41 1468.18 N 585.42 W 5967641.29 N 707455.16 E 0.501 1578.15 3948.51 50.320 334.120 3304.28 3354.73 1534.64 N 616.77 W 5967706.87 N 707421.98 E 2.848 1651.64 1 October, 2002 - 16:20 Page 2 0'6 Drill Quest 3.03.02.002 Sperry-Sun Drilling Services Survey Report for LIsburne PSI (East Dock) - PSI-10 MWD Your Ref: APlS00292311000 Job No. AKMW2213~, Surveyed: 8 August, 2002 BPXA North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 4041.06 49.560 332.300 3363.85 3414.30 1597.87 N 648.69 W 5967769.19 N 707388.32 E 1.714 1722.43 4136.65 50.210 334.710 3425.44 3475.89 1663.29 N 681.29 W 5967833.68 N 707353.92 E 2.044 1795.50 4231.14 50.120 334.610 3485.97 3536.42 1728.87 N 712.34 W 5967898.37 N 707321.06 E 0.125 1868.05 4320.49 50.270 335.850 3543.17 3593.62 1791.19 N 741.10 W 5967959.87 N 707290.59 E 1.079 1936.69 4415.12 51.070 336.020 3603.15 3653.60 1858.03 N 770.94 W 5968025.85 N 707258.90 E 0.857 2009.88 4508.40 51.820 336.300 3661.29 3711.74 1924.75 N 800.43 W 5968091.73 N 707227.58 E 0.838 2082.81 ~" 4604.26 50.690 334.320 3721.28 3771.73 1992.68 N 831.64 W 5968158.77 N 707194.49 E 1.996 2157.57 4699.90 50.1 50 333.290 3782.22 3832.67 2058.82 N 864.18 W 5968223.98 N 707160.14 E 1.004 2231.26 4792.59 50.540 333.860 3841.37 3891.82 2122.73 N 895.94 W 5968286.99 N 707126.62 E 0.633 2302.60 4887.20 51 .000 333.460 3901.21 3951.66 2188.40 N 928.45 W 5968351.74 N 707092.30 E 0.586 2375.86 4980.17 51.620 334.640 3959.33 4009.78 2253.65 N 960.20 W 5968416.08 N 707058.75 E 1.194 2448.41 5073.79 52.630 335.590 4016.80 4067.25 2320.69 N 991.30 W 5968482.23 N 707025.81 E 1.344 2522.31 5163.40 53.330 336.050 4070.76 4121.21 2385.96 N 1020.60 W 5968546.66 N 706994.71 E 0.882 2593.85 5258.43 52.510 333.190 4128.06 4178.51 2454.45 N 1053.08 W 5968614.23 N 706960.34 E 2.551 2669.65 5351.67 52.430 333.700 4184.86 4235.31 2520.59 N 1086.14 W 5968679.43 N 706925.47 E 0.442 2743.56 5447.68 53.070 335.960 4242.98 4293.43 2589.75 N 1118.63 W 5968747.66 N 706891.07 E 1.989 2819.98 5541.24 52.670 333.580 4299.46 4349.91 2657.22 N 1150.42 W 5968814.22 N 706857.43 E 2.073 2894.56 5634.26 53.480 335.190 4355.34 4405.79 2724.27 N 1182.56 W 5968880.36 N 706823.44 E 1.635 2968.91 5729.17 51.220 332.560 4413.32 4463.77 2791.74 N 1215.62 W 5968946.88 N 706788.52 E 3.238 3044.02 5823.13 50.080 332.950 4472.90 4523.35 2856.33 N 1248.88 W 5969010.53 N 706753.48 E 1.255 3116.62 5916.22 50.400 333.750 4532.43 4582.88 2920.29 N 1280.98 W 5969073.58 N 706719.63 E 0.745 3188.15 6011.98 50.890 332.730 4593.16 4643.61 2986.40 N 1314.32 W 5969138.74 N 706684.47 E 0.970 3262.15 6110.66 51 .330 332.290 4655.11 4705.56 3054.54 N 1349.77 W 5969205.86 N 706647.14 E 0.565 3338.88 .~ 6209.31 51 .130 331.670 4716.89 4767.34 3122.44 N 1385.91 W 5969272.74 N 706609.14 E 0.530 3415.68 6304.83 51.260 332.060 4776.75 4827.20 3188.08 N 1421.01 W 5969337.38 N 706572.23 E 0.346 3490.00 6397.45 50.170 333.730 4835.39 4885.84 3251.88 N 1453.67 W 5969400.26 N 706537.81 E 1.825 3561.63 6490.91 49.860 332.970 4895.45 4945.90 3315.89 N 1485.79 W 5969463.34 N 706503.93 E 0.706 3633.21 6583.71 50.1 00 334.870 4955.13 5005.58 3379.71 N 1517.03 W 5969526.28 N 706470.94 E 1.589 3704.26 6673.80 50.640 334.810 5012.59 5063.04 3442.51 N 1546.53 W 5969588.24 N 706439.71 E 0.602 3773.64 6768.18 50.630 335.900 5072.45 5122.90 3508.83 N 1576.96 W 5969653.69 N 706407.46 E 0.893 3846.60 6862.56 51.270 338.080 5131.92 5182.37 3576.29 N 1605.60 W 5969720.33 N 706376.96 E 1.918 3919.85 6956.61 55.030 340.090 5188.31 5238.76 3646.59 N 1632.43 W 5969789.85 N 706348.19 E 4.348 3994.90 7051.98 54.960 341.430 5243.02 5293.47 3720.34 N 1658.17 W 5969862.86 N 706320.41 E 1.153 4072.64 7146.06 54.430 340.820 5297.40 5347.85 3792.99 N 1683.00 W 5969934.80 N 706293.58 E 0.773 4148.99 7241.58 53.460 340.220 5353.61 5404.06 3865.79 N 1708.75 W 5970006.86 N 706265.82 E 1.135 4225.86 1 October, 2002 - 16:20 Page 3 of6 DrillQuest 3.03.02.002 Sperry-Sun Drilling Services Survey Report for Lisburne PSI (East Dock) - PSI-10 MWD Your Ref: API 500292311000 Job No. AKMW22135, Surveyed: 8 August, 2002 BPXA North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth I net. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (a/100ft) 7335.43 53.600 339.430 5409.40 5459.85 3936.63 N 1734.78 W 5970076.95 N 706237.84 E 0.693 4301.07 7431.04 53.000 338.550 5466.54 5516.99 4008.19 N 1762.26 W 5970147.72 N 706208.38 E 0.969 4377.55 7523.38 54.980 335.590 5520.83 5571.28 4076.96 N 1791.38 W 5970215.65 N 706177.37 E 3.364 4452.18 7617.72 54.830 334.690 5575.07 5625.52 4146.99 N 1823.83 W 5970284.76 N 706142.99 E 0.797 4529.37 7712.08 54.300 335.060 5629.78 5680.23 4216.60 N 1856.47 W 5970353.44 N 706108.43 E 0.646 4606.25 ~'~ 7805.15 53.360 335.490 5684.71 5735.16 4284.84 N 1887.90 W 5970420.79 N 706075.13 E 1.077 4681.38 7899.17 53.360 335.530 5740.82 5791.27 4353.50 N 1919.17 W 5970488.55 N 706041.96 E 0.034 4756.82 7993.48 53.380 336.790 5797.09 5847.54 4422.72 N 1949.76 W 5970556.90 N 706009.47 E 1.072 4832.49 8085.92 52.980 338.310 5852.49 5902.94 4491.11 N 1978.02 W 5970624.48 N 705979.33 E 1.386 4906.42 8180.05 53.230 337.200 5909.00 5959.45 4560.78 N 2006.52 W 5970693.33 N 705948.91 E 0.980 4981.61 8272.99 53.650 336.460 5964.37 6014.82 4629.41 N 2035.90 W 5970761.12 N 705917.64 E 0.783 5056.23 8366.75 53.840 337.190 6019.81 6070.26 4698.92 N 2065.65 W 5970829.78 N 705885.97 E 0.660 5131.80 8460.50 53.590 337.050 6075.29 6125.74 4768.54 N 2095.03 W 5970898.56 N 705854.68 E 0.293 5207.32 8552.77 53.830 337.190 6129.91 6180.36 4837.06 N 2123.95 W 5970966.25 N 705823.87 E 0.287 5281.65 8648.60 54.180 335.250 6186.23 6236.68 4908.01 N 2155.21 W 5971036.30 N 705790.65 E 1.678 5359.16 8742.49 55.010 335.780 6240.63 6291.08 4977.65 N 2186.93 W 5971105.04 N 705757.02 E 0.997 5435.68 8834.80 54.720 334.460 6293.75 6344.20 5046.13 N 2218.68 W 5971172.62 N 705723.38 E 1.211 5511.17 8929.18 54.560 334.250 6348.37 6398.82 5115.52 N 2252.00 W 5971241.06 N 705688.16 E 0.248 5588.13 9022.68 54.950 333.370 6402.33 6452.78 5184.04 N 2285.70 W 5971308.62 N 705652.57 E 0.875 5664.48 9117.89 54.730 333.790 6457.16 6507.61 5253.75 N 2320.33 W 5971377.34 N 705616.02 E 0.428 5742.29 9212.69 54.300 334.220 6512.19 6562.64 5323.13 N 2354.17 W 5971445.76 N 705580.27 E 0.585 5819.47 9305.56 54.090 333.670 6566.52 6616.97 5390.80 N 2387.25 W 5971512.48 N 705545.33 E 0.531 5894.77 9399.52 53.810 333.300 6621.81 6672.26 5458.77 N 2421.16 W 5971579.49 N 705509.55 E 0.436 5970.71 --,/ 9492.87 54.050 332.360 6676.78 6727.23 5525.90 N 2455.62 W 5971645.64 N 705473.24 E 0.854 6046.10 9579.27 54.130 333.070 6727.45 6777.90 5588.09 N 2487.69 W 5971706.92 N 705439.45 E 0.672 6116.02 9678.88 53.900 332.980 6785.98 6836.43 5659.92 N 2524.26 W 5971777.71 N 705400.92 E 0.242 6196.57 9772.34 52.350 332.390 6842.06 6892.51 5726.35 N 2558.56 W 5971843.16 N 705364.79 E 1.734 6271.26 9864.77 50.180 331.650 6899.89 6950.34 5790.02 N 2592.38 W 5971905.87 N 705329.22 E 2.429 6343.26 9958.88 48.850 332.110 6960.99 7011.44 5853.15 N 2626.11 W 5971968.03 N 705293.74 E 1.461 6414.72 10052.61 46.140 331.590 7024.32 7074.77 5914.07 N 2658.70 W 5972028.03 N 705259.48 E 2.920 6483.70 10146.74 43.340 331.630 7091.17 7141.62 5972.35 N 2690.21 W 5972085.42 N 705226.37 E 2.975 6549.83 10241 .27 42.840 331.520 7160.20 7210.65 6029.14 N 2720.94 W 5972141.34 N 705194.07 E 0.535 6614.29 10334.59 40.940 331.970 7229.67 7280.12 6084.03 N 2750.44 W 5972195.38 N 705163.06 E 2.061 6676.49 10428.25 38.420 332.4 70 7301.75 7352.20 6136.93 N 2778.32 W 5972247.49 N 705133.73 E 2.712 6736.21 10523.55 36.170 332.450 7377.56 7428.01 6188.12 N 2805.02 W 5972297.93 N 705105.63 E 2.361 6793.89 1 October, 2002 - 16:20 Page 4 of6 DrillQuest 3.03.02.002 Sperry-Sun Drilling Services Survey Report for Lisburne PSI (East Dock) -I'SI-10 MWD Your Ref: API 500292311000 Job No. AKMW22135, Surveyed: 8 August, 2002 BPXA North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 10617.73 34.650 334.300 7454.32 7504.77 6236.89 N 2829.48 W 5972346.00 N 705079.82 E 1.975 6848.43 10711.86 34.220 333.910 7531.95 7582.40 6284.78 N 2852.73 W 5972393.22 N 705055.26 E 0.513 6901.65 10806.07 32.460 334.190 7610.65 7661.10 6331.33 N 2875.39 W 5972439.13 N 705031.32 E 1.875 6953.42 10900.34 28.700 332.960 7691.80 7742.25 6374.28 N 2896.70 W 5972481.47 N 705008.82 E 4.043 7001.35 10992.91 25.430 334.180 7774.22 7824.67 6411.98 N 2915.47 W 5972518.64 N 704989.02 E 3.583 7043.45 11088.51 23.440 334.480 7861.25 7911.70 6447.62 N 2932.60 W 5972553.79 N 704970.90 E 2.086 7082.99 ~,r 11182.76 21.660 333.680 7948.29 7998.74 6480.13 N 2948.39 W 5972585.85 N 704954.22 E 1.916 7119.12 11278.36 19.760 334.200 8037.71 8088.16 6510.50 N 2963.25 W 5972615.79 N 704938.52 E 1.997 7152.92 11366.07 18.740 333.820 8120.52 8170.97 6536.49 N 2975.92 W 5972641.42 N 704925.14 E 1.172 7181.83 11460.01 17.570 336.330 8209.78 8260.23 6563.02, N 2988.27 W 5972667.60 N 704912.06 E 1.498 7211.10 11551.30 17 .000 336.340 8296.95 8347.40 6587.86 N 2999.16 W 5972692.13 N 704900.49 E 0.624 7238.22 11645.55 16.620 336.920 8387.17 8437.62 6612.88 N 3009.97 W 5972716.84 N 704888.99 E 0.441 7265.46 11721.15 16.270 337.220 8459.68 8510.13 6632.59 N 3018.31 W 5972736.32 N 704880.10 E 0.476 7286.85 11809.00 16.270 337.220 8544.01 8594.46 6655.29 N 3027.84 W 5972758.74 N 704869.95 E 0.000 7311.45 Projected Survey All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to PSI slot J. Northings and Eastings are relative to PSI slot J. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from PSI slot J and calculated along an Azimuth of 335.080° (True). Magnetic Declination at Surface is 26.354°(08-Aug-02) r- Based upon Minimum Curvature type calculations, at a Measured Depth Of 11809.00ft., The Bottom Hole Displacement is 7311.68f1., in the Direction of 335.537° (True). . ~ 1 October, 2002 - 16:20 Page 50f6 DrillQuest 3.03.02.002 Sperry-Sun Drilling Services Survey Report for Lisburne PSI (East Dock) - PSI-10 MWD Your Ref: API 500292311000 Job No. AKMW22135, Surveyed: 8 August, 2002 BPXA North Slope Alaska Comments Measured Depth (ft) Station Coordinates TVD Northings Eastlngs (ft) (ft) (ft) Comment 11809.00 8594.46 6655.29 N 3027.84 W Projected Survey ~ Survey tool prOgram for PSI-10 MWD From Measured Vertical Depth Depth (ft) (ft) . To Measured Vertical Depth Depth (ft) (ft) Survey Tool Description 0.00 908.00 0.00 908.00 905.46 11809.00 905.46 Tolerable Gyro(PSI-10 Gyro) 8594.46 MWD Magnetic(PSI-10 MWD) ,--- ~ 1 October, 2002 - 16:20 Page 60f6 DrillQuest 3.03.02.002 ) ) MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Mike Bill Commissioner f"'.1If1 DATE: November 2, 2002 SUBJECT: Mechanical Integrity Tests THRU: Tom Maunder BPXA Petroleum Engineed G9YY\ P.S. I Pad (j,Y \\\",07 PSI-01, 08, 09, 10 FROM: Jeff Jones Prudhoe Bay Unit Petroleum Inspector Prudhoe Bay Field NON- CONFIDENTIAL Packer Depth Pretest Initial 15 Min. 30 Min. TV.D. 8040 Tubing 900 900 900 900 Interval Test psi 2010 Casing 150 2090 2090 2085 P/F OA 200 450 450 450 Notes: Pre-test pressures monitored 15 min. & stable. Test fluid 60/40 methanol. S riser temp: 70 deg. F Well PSI-01 Type Inj. S P.T.D. 202145~ Type test P Well PSI-08 Type Inj. S TV.D. 8014 Tubing 1175 1340 1340 1350 Interval P.T.D. 202172~Typetest P Test psi 2004 Casing 80 2110 2090 2110 P/F OA 220 420 420 420 Notes: Pre-test pressures monitored 15 min. & stable. Test fluid 60/40 methanol. S riser temp: 72 deg. F Well PSI-09 Type Inj. S TV.D. 8034 Tubing 1160 1000 1160 1150 Interval P.T.D. 2021240/Type test P Test psi 2009 Casing 380 2060 2060 2065 P/F v ~ ~ ~ ~ ~ Notes: Pre-test pressures monitored 15 min. & stable. Test fluid 60/40 methanol. S riser temp: 76 deg. F Pretest Initial 15 Min. 30 Min. 45 Min. Well PSI-10 Type Inj. S TV.D. 8056 Tubing 850 850 850 850 850 Interval P.T.D. 2021590 /Type test P Test psi 2014 Casing 0 2090 2085 2080 2080 P/F ~ OA 320 580 580 580 580 Notes: Pre-test pressures monitored 15 min. & stable. Test fluid 60/40 methanol. S riser temp: 74 deg. F Type INJ. Fluid Codes Type Test Interval F = FRESH WATER INJ. M= Annulus Monitoring 1= Initial Test G = GAS INJ. p= Standard Pressure Test 4= Four Year Cycle S = SALT WATER INJ. R= Internal Radioactive Tracer Survey V= Required by Variance N = NOT INJECTING A= Temperature Anomaly Survey W= Test during Workover D= Differential Temperature Test 0= Other (describe in notes) Test's Details November 2, 2002: I traveled to BPXA's PSI Pad in the Prudhoe Bay Field to witness initial MIT's on water injection wells PSI-OI, PSI-08, PSI-09 and PSI-tO. Roland Johnson was the BPXA representative today and he performed the tests in a safe and proficient manner. The pre-test pressures were observed for 15 minutes and found to be stable. The standard annulus pressure test was then performed, with all four wells passing the MIT. Well PSI-I0 was monitored an additional 15 minutes to further demonstrate integrity and the casing pressure stabilized at 2080 PSI. The four well houses were inspected with no exceptions noted. Summary: I witnessed successful MIT's on BPXA's Prudhoe Bay Field water injection wells PSI-OI, PSI-08, PSI-09 and PSI-IO. Four well house inspections; no exceptions noted. .1.T.'s performed: ~ Attachments: Number of Failures: Q Total Time during tests: 5 hrs. cc: MIT report form 5/12/00 L.G. MIT PBU PSI 01,08,09,10 11-2-02 JJ.xls I ~ I ~ I ~ I ~ 11/4/2002 Schlumbepger Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 A TTN: Beth ~ Well PSI-10 dr\~- f)q D.S. 1-22A J qq".. J h5 D.S.11-17A~~_~~ ~ Job# TEMP & PRESS LOG PRODUCTION PROFILE PRODUCTION PROFILE Log Description Date 10/14/02 10/07/02 10/01/02 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. ECe\VED Petrotectnical Data Center LR2-1 R . . 900 E. Benson Blvd. Anchorage, Alaska 99508 NOV 0 1 2002 Date Delivered: ~~ Q~ & ~~. ConS. CommisSiOn Anchorage Blueline 10/24/02 NO. 2513 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Sepia Color Prints CD Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 A TIN: Beth Reœlved~Wkp:) SchtDm_epgBP Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth Well PSI-10 ~ð~-J5q D.S.14-12 I ~J--I °'1 BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: Job# Log Description Date 22422 USIT 22382 RST -SIGMA 08/27/02 07/08/02 RECEIVED OCT 0 1 200? AIa8ka Oil & Gal eons. CommIuUn AncINnge Blueline NO. 2418 Company: 09/16/02 State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Sepia Color Prints 2 Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 A TIN: Beth Receive~: ~ CD L OOdf-'.J ) J Œ TONY KNOWLES, GOVERNOR AIfASIiA. OIL AND GAS CONSERVATION COMMISSION Brian Robertson Senior Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage AK 99519 333 W. -¡TH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276.7542 Re: Prudhoe Bay Unit PSI -10 BP Exploration (Alaska), Inc. Pennit No: 202-159 Surface Location: 1394' SNL, 957' EWL, Sec. 15, TIIN, RI5E, UM Bottomhole Location: 5263' SNL, 3232' EWL, Sec. 04, TllN, RI5E, UM Dear Mr. Robertson: Enclosed is the approved application forpennit to drill the above referenced service well. The pennit to drill does not exempt you from obtaining additional pennits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required pennits and approvals have been issued. In addition, the Commission reserves the right to withdraw the pennit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the tenns and conditions of this pennit may result in the revocation or suspension of the pennit. The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035; and the mechanical integrity (MI) of the injection wells must be demonstrated under 20 AAC 25.412 and 20 AAC 25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test before operation, and of the BOPE test perfonned before drilling below the surface casing shoe, must be given so that a representative of the Commission may witness the tests. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Sincerely, (~/~'Jf Cammy ~echsli Taylor Chair BY ORDER 2" THE COMMISSION DATED this11h. day of August, 2002 cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Hole 42" 16" 12-1/4" 8-1/2" '\ STATE OF ALASKA , ALASKA~_.l AND GAS CONSERVATION COMM~,-.AION PERMIT TO DRILL 20 AAC 25.005 1 b. Type of well [] Exploratory [] Stratigraphic Test [] Development Oil 181 Service [] Development Gas [] Single Zone [] Multiple Zone 5. Datum Elevation (DF or KB) 10. Field and Pool Plan KBE = 51.41 Prudhoe Bay Field / Prudhoe 6. Property Designation Bay Pool ADL 034631 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number PSI-10 9. Approximate spud date 08/09/02 Amount $200,000.00 14. Number of acres in property 15. Proposed depth (MD and TVD) 2560 11852' MD / 8606' TVD 17. Anticipated pressure {see 20 MC 25.035 (e) (2)} 0 53 Maximum surf¡¡ce 3000 psig, At total depth (TVD) 8606' / 3848 psig Setting Depth T QO Bottom MD TVD MD TVD Surface Surface 73' 73' Surface Surface 6052' 4647' Surface Surface 11477' 8255' 97691 8120' 11852' 8606' ItJbA- 1- ¡'~1:J~ ~ <6/~/~ \. 1 a. Type of work 181 Drill [] Redrill [] Re-Entry [] Deepen 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1394' SNL, 957' EWL, SEC. 15, T11 N, R15E, UM (As Planned) At top of productive interval 88' SNL, 31911 EWL, SEC. 09, T11 N, R15E, UM At total depth 5263' SNL, 3232' EWL, SEC. 04, T11 N, R15E, UM 12. Distance to nearest property line 13. Distance to nearest well ADL 034632, 3232' MD PSI.09 is 32' away at 700' MD 16. To be completed for deviated wells Kick Off Depth 300' MD Maximum Hole Angle 18. Casin~ Program Specifications Size Casina Weiaht Grade Couplina 34" x 20" 91.51# H-40 Weld 13-3/8" 68# L-80 BTC 9-5/8" 47# L-80 BTC-M 7" 26# L-80 BTC-M 11. Type Bond (See 20 AAC 25.025) Number 2S 100302630-277 Lenath 80' 6052' 11477' 555' Quantitv of Cement (include staae data) 260 sx Arctic Set (Approx.) 1346 sx Articset III Lite, 599 sx 'G' 615 sx Class 'G' 116 sx Class 'G' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical feet feet feet feet Junk (measured) Plugs (measured) Casing Structural Conductor Surface Intermediate Production Liner Length Size Cemented MD TVD N~~. {2.f:lfUtS'1'" "1114"f"" v¡H:ttANtE=' ïÞ P"LE ).0 Me. )S. £ft2.. (I,) BE=' ~'t€b. 1>9 tte-~~JÙ~AT""P1G p~ ßF' P'-Ac(7D uP -ro '1.S"O' ~ '1\1ê"TO ) I'~'~rr!f~.v ('IòÞ I "'''~)- , . t. "'""' " ~,,- 1 ~~ ~/3"O7-. JUL \31 Perforation depth: measured AJaJ3ka & .AnchoraQo 181 Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch 181 Drilling Program 181 Drilling Fluid Program [] Time vs Depth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Walter Quay, 564-4178 Prepared By Name/Number: Terrie Hubble, 564-4628 ~.~~ D~ Permit Number API Number . Appro~al D~te See cover lett~r ;2..,0:;"-/$1 50- 0.2, 9 - 2- 311t) ~ \\\(J~ forotherreOUlrements Conditions of Approval: Samples Required 0 Yes BI No Mud Log Required 0 Yes 181 No Hydrogen Sulfide Measures 0 Yes mI No Directional Survey Required .œJ Yes 0 No Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU Other: M~T ~ CVfA.-t¡UA-l; bn (:J) ~/tAÂr>-t'J. T~~t- ~t'fE ~ 4000 (Xi: it? ~c. tS. t..jiLG J w.JV~d, by order of /' [ \ Approved By Ongloa1 Signee y On ø. rC. f. ~mJ...S~O. .0.. rrr the commission Date >5.'L~' ';l Form 10-401 Rev. 12cawuecns" layb 1\ IlJ . i\J 1-\ -- Suömit In Triplicate true vertical 20. Attachments .' 'ß -) I Well Name: ) PSI-10 I Drill and Complete Summary I Type of Well (producer or injector): I Injector - Water Surface Location: x = 708,081 / Y = 5,966,190 1394'FNL,957' FVVL, Sec. 15,T11N,R15E X = 704,840 / Y = 5,972,690 88' FNL, 3191' FVVL, Sec. 9, T11N,R15E X = 704,878 / Y = 5,972,795 5263' FNL, 3232' FVVL, Sec. 04,T11N, R15E Target Location: Bottom Hole Location: I AFE Number: I PBD4P1924 I I MD: 1 11,852' I I TVD: I 8,606' 1 I Estimated Start Date: I 08/09/02 1 I Operating days to complete: I 24.3 1 I RiQ: I Nabors 27e I I KB: 134.5' I I Ground Elevation: 117.6' I 1 KB Elevation: 1 51.4 I I I I Well Design (conventional, slim hole, etc.): I Big Bore I Objective: I High rate water injection into Ivishak Gas Cap, Zones 3 through 1 Formation Markers (wp05) Tops MD TVDss Comments Base PF 1953 1902 8.6 ppg SV4 4257 3566 8.6 ppg SV3 4928 3970 8.6 ppg SV2 5262 4171 8.6 ppg SV1 5886 4547 8.6 ppg UG4 6707 5042 8.6 ppg UG3 7072 5262 8.6 ppg UG 1 8242 5907 8.6 ppg . VVest Sak 2 9035 6445 8.6 ppg VVest Sak 1 9343 6631 8.6 ppg CM3 9681 6834 8.6 ppg CM2 na Na 8.6 ppg CM1 na Na 8.6 ppg THRZ 11,312 8100 8.6 ppg BHRZ/LCU 11,512 8287 8.6 ppg TZ4 NA Na 7.5 ppg; HC Bearing TZ3 11512 8100 7.5 ppg; HC Bearing TZ2 11 ,577 8348 7.5 ppg; HC Bearing BSAO 11,618 8387 7.5 ppg; HC Bearing TO 11,852 8606 7 ~5 ppg; TLSB N/A 8.6 ppg; HC Bearing Surface TD Criteria: Based on -100' TVO below SV1 Top. Intermediate TD Criteria: Casing to be set above BHRzrrZ4 transition. TD Criteria: Based on 50' TVO above TLSB. Drilling Permitdoc 7/31/2002 Page 1 of 10 ~) ) I ) Grade Conn Length Top Btm MD/TVD MD/TVD H-40 Welded 80' GL -73' 173' CasinQlTubinQ ProQram Hole Size Csg/ WtlFt Tbg O.D. Insulated 20" 91.51 # (34" 00) 16" 13-3/8" 68# L-80 BTC -6052' GL 6052' 14647' 12-1/4" 9-518" 47# L-80 BTC-M -11,477' GL 11,477'/8,255' 8-1/2" 7" 26# L -80 BTC-M -555' 9769' 1 8,120' 11 ,852' 1 8,606' Tubing 7-5/8" 29.7# L-80 STL ...11,327' GL 11,327'/8115' NOTE: This well is planned with the minimum allowed, 100' liner lap, the 9-5/8" shoe will be located near the. bottom of the HRZ, but with the planned completion, the pac.ker to injection zone distance will more than likely be. greater than the 200' as per 20 AAC 25.412 (b), but less. than 250'. Approval for 250' packer to injection zone is requested. 42" Directional KOP: I 300' MO Maximum Hole Angle: Close Approach Well: -530 In intermediate section from 3200' to 9760' PSI-10 passes BP Close Approach guidelines. The nearest well is PSI-09 which is -35 well-to-well at surface and 32' at 700'. Survey Program: Standard MWO Surveys from surface to TO. *Refer to the attached, approved Sperry directional program - wp05 Mud ProQram 16" Surface Hole I Freshwater Spud Mud From Surface to -80' TVO below top SV1 Interval Density Viscosity (ppg) (seconds) Initial to Base PF 8.8 - 9.5 200-300 Base PF to Top SV sands 9.0 - 9.5 100-150 Top SV sand to Interval TO 9.5 max 75-150 *Refer to the attached Baroid mud program for details 12-1/4" Intermediate Hole I LSND From Surface Casing Shoe to BHRZ Interval Density Plastic Viscosity YP (ppg) (cp) (Ib/100ft2) Initial to THRZ 9.0-9.8 10-15 25-30 THRZ to BHRZ 10.3 10-15 20-30 *Refer to the attached Baroid mud program for details 8-1/2" Production Hole I BARADRILn From Intermediate Casing Shoe to TO Interval Density Plastic Viscosity YP (ppg) (cp) (lb/100ft2) Ivishak 8.8-9.0 10-15 17-25 *Refer to the attached Baroid mud program for details Drillìng Pennit.doc 7/31/2002 YP tauo API FL pH (Ib/100ff) (lb/100ft2) (mls/30min) 50-70 >8 15-20 8.5- 9.5 30-45 >6 4-10 8.5- 9.5 20-35 >6 4-10 8.5- 9.5 tauo (lb/100ff) 4-7 4-7 10' Gel API HTHP FL (mls/30min) 6-10 4-61<12.0 8.5-9.5 8.5-9.5 pH LGS % vol <5 <5 10 10 tauo (lb/100ff) 3-5 10' Gel API HTH P FL (mls/30min) 4-6<12.0 8.5-9.5 pH LGS % vol <5 10 Page 2 of 10 ¡¡ ) ) Integrity Testing The 13-3/8" surface casing point is expected to provide a fracture gradient of 12.5 to 13.5 ppg EMW. Fracture gradient information from offset are shown below: Well Name East State Bay-1 L2-32 L3-01 L3-05 PSI-06 PSI-09 Formation SV-4? SV-4 SV-3 SV-3 SV-1 SV-1 TVDss 2745' TVDss 3589' TVDss 4009' TVDss 4032' TVDss 4564' TVD 4675' TVD Frac Gradient, PPG 12.1 ppg EMW 12.5 ppg EMW 13.8 ppg EMW 12.5 ppg EMW 13.4 ppg EMW 12.1 ppg FIT Kick tolerance volume will be continually updated as the well is in progress, incorporating the most up-to-date data available from the well. Below are the planned integrity test points. Test Point Depth Surface Casing Shoe 20' minimum below shoe Intermediate Casing Shoe 20' minimum below shoe Well Evaluation ProQram ~ 16" Surface: Drilling: Open Hole: Cased Hole: Coring: Sampling: 12-1/4" Intermediate: Drilling: Open Hole: Cased Hole: Coring: Sampling: 8-112" Production: Drilling: Open Hole: Cased Hole: Coring: Sampling: Drillìng Pennit.doc MWD/GR None None None None Test Type FIT FIT EMW 12.0 ppg for -105 bbl kick tolerance 10.0 ppg MWD 1 GR 1 Res - Realtime from 500' above BHRZ to section TD None USIT None Cuttings Samples - from 500' above BHRZ to section TD MWD 1 GR 1 NEU 1 LWD **- Realtime over entire interval BHC Sonic 1 GR None None Cuttings Samples and Gas Detection - Entire Interval 7/3112002 Page 3 of 10 . ') Cement Program The following surface casing cement calculations are based upon a single stage job. As contingency, a port collar will be run in the casing at -1000' MD to allow circulating cement to surface if the single stage is unsuccessful. In the event that cement is not circulated to surface during the initial surface casing cement job, notify the AOGCC of the upcoming remedial cement work for possible witness of cement to surface. Casing Size 113-3/8" Surface I Basis: Lead: Open hole volume + 400% excess in permafrost; 500/0 excess below permafrost. Lead TOC: To Surface. Tail: Open hole volume + 50% excess + 82' shoe track volume. Tail TOC: 1000' MD above 13-3/8" shoe (-5050' MD) Fluid Sequence & Volumes: Pre Flush Spacer Lead 75 bbls MudPUSH Viscosified Spacer weighted to 10.2 ppg 1064 bbl I 5974 fe I 1346 sks of Dowell ArticSET III-Lite at 10.7 ppg and 4.44 dIsk, BHST 45° I BHCT 52°, TT = 6.0 hrs 124 bbl I 696 fe 1599 sks of Dowell Premium 'G' at 15.8 ppg and 1.16 dIsk, BHST 90° I BHCT 860, TT = 4 hrs *See Attached Dowell Cement Program for Details Casing Size I 9-5/8" Intermediate Basis: Lead: None Tail: Open hole volume + 50% excess + 82' shoe track volume Tail TOC: 1500' above 9-5/8" shoe (-9,919 MD) Fluid Sequence & Volumes: Pre 80 bbls Chemical wash at 8.3 ppg Flush Spacer Lead Tail Tail 50 bbls MudPUSH Viscosified Spacer weighted to 12.0 ppg None 131 bbl I 738 fe /615 sks of Dowell Premium Latex 'G' at 15.8 ppg and 1.20 dIsk, BHST 1700 I BHCT 1310, TT = Batch Mix + 4.0 hrs *See Attached Dowell Cement Program for Details Liner Size I 7" Production Basis: Lead: None Tail: Open hole volume + 50% Excess + 82' shoe track + 150' liner lap + 200' of 9-5/8" x 5" DP annulus volume. Tail TOC: -11,377' MD (-' TVD).- Liner top. Fluid Sequence & Volumes: Pre 30 bbls CW100 at 8.3 ppg Flush Spacer Lead Tail 30 bbls MudPUSH Viscosified Spacer weighted to 11.0 ppg None 25 bbl I 139 fe I 116 sks of Dowell Premium Latex 'G' at 15.8 ppg and 1.20 dIsk, BHST 1810 I BHCT 1370, TT = Batch Mix + 3.5 hrs *See Attached Dowell Cement Program for Details Drilling Pennit.doc 7/3112002 Page 4 of 10 .. ) Well Control Well control equipment consisting of 5000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Surface Interval- BOPE Maximum anticipated BHP Maximum surface pressure Kic k tolerance Planned BOP test pressure 13-3/8" Casing Test pressure Intermediate Interval- BOPE Maximum anticipated BHP Maximum surface pressure Kick tolerance Planned BOP test pressure 9-5/8" Casing Test pressure Production Interval- BOPE Maximum anticipated BHP Maximum surface pressure Kick tolerance Planned BOP test pressure 9-5/8" Casingn" Liner Test Planned completion fluids 20", 2M Diverter (Hydril - MSP) 2078 psi (8.6 ppg @ 4647' TVD) 1614 psi N/A Function test 3500 psi surface pressure 13-3/8", 5M, 3 Gates with Annular (Hydril - GL) 3691 psi (8.6 ppg@ 8254' TVD) 2866 psi (.10 psi/ft gas gradient to surface) 105 bbls 4CtXÞ ~Gk" Rams test to 3.,66O'"psi/250 psi. Annular test to 2,500 psi/250 psi 3500 psi surface pressure 13-3/8", 5M, 3 Gates with Annular (Hydril - GL) 3848 psi (8.6 ppg @ 8606' TVD) 3000 psi (.10 psi/ft gas gradient to surface) Infinite Rams test to 4,000psi/250 psi. Annular test to 2,500 psi/250 psi 4000 psi surface pressure 8.4 ppg Seawater / 6.8 ppg Diesel Disposal . No annular injection in this well. . Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS- 04. Any metal cuttings will be sent to the North Slope Borough. . Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I wastes to Pad 3 for disposal. Drilling Pennit.doc 7/31/2002 Page 5 of 10 ) ) Drill and Complete Procedure Summary Pre-Ritl Work: 1. The 20" insulated conductor should be installed. 2. The FMC landing ring for the FMC Big Bore wellhead on the 20" conductor and the two 4" side outlet valves on the conductor pipe for surface cementing operations are in place. Ritl Operations: 1. Move Nabors 27e from PSI-01 to PSI-10 / 2. Nipple up and function test diverter system. PU 5" DP to drill surface hole and stand back in derrick. 3. MU 16" drilling assembly with MWD/GR and directionally drill surface hole to approximately 6052' MD / 4647' TVD. The actual surface hole;o will be +/-100' TVD below the top of the SV1 sands. 4. Run and cement the 13-3/8", 68# surface casing back to surface. A port collar will be run in the casing to allow for secondary cementing if cement is not circulated to surface during primary cementing operations. 5. ND diverter system and NU casingl tubing head. NU BOPE and test to 4000 psi. ~~ 6. MU 12-1/4" drilling assembly with MWD/GR/Res and RIH to float collar. Test the 13-3/8" casing to 3500 psi for 30 minutes. 7. Drill out shoe joints and displace well to 9.0 ppg LSND drilling fluid. Drill new formation to 20' below 13-3/8" shoe and perform Leak Off Test. 8. Drill ahead as per directional plan and mud program. 9. Increase mud weight to 10.3 ppg prior to the HRZ. Short trip as required. 10. TD the 12-1/4" interval in the BHRZ. Get as close to the BHRZfTZ3 as possible without penetrating TZ3. 11. Run and cement the 9-5/8", 47# intermediate casing. -Displace cement with 10.0 ppg mud. Freeze protect the 13-3/8" X 9-5/8" annulus to 2200' MD. ~ 12. OPTION: If cement job went poorly or is suspect, RU E-line. RIH with USIT. Log bottom 1500' MD of wellbore. Determine bond quality and TOC. POH. Otherwise continue with program. 13. MU 8-1/2" drilling assembly with MWD/GR/NUE/LWD and RIH to float collar. Test the 9-5/8" casing to 3500 psi for 30 minutes. 14. Drill out shoe joints and 20' of new formation. Formation Integrity Test will be the 10.0 ppg MW in the hole. Displace hole over to 9.0 ppg BARADRILn fluid. 15. Drill ahead as per directional plan to proposed TD at 11,851' MD / 8606' TVD. The actual TD of the well will extend +/-60' TVD below the BSAD, but no deeper than 50' TVD above the TLSB. Short trip as required and condition hole for running the 7" liner. /~ 16. RU E-Line. Run USIT to log bottom 1500' of 9-5/8" casing and the BHC sonic. 17. Make open hole clean-out if necessarY. 18. Run and cement the 7", 26# liner:'The liner will extend up into the 9-5/8" casing -100' MD (MIN) and will be fully cemented to the liner top. Displace cement with mud. POOH with drillpipe. 19. RIH with 6-1/8" bit, a scraper for the 7",26# liner, and a scraper for 9-5/8",47# casing. Clean out to PBTD. Displace hole over to seawater. 20. Test wellbore to 4000 psi for 30 minutes. POH laying down drill pipe as necessary. 21. Run 7-5/8", IPC, Flush-joint, injection string with tailpipe. /' 22. Locate above 7" tie back sleeve. Set packer. 23. Shear out of PBR. PU and space out. Make up tubing hanger. 24. Circulate Freeze protection. Allow diesel to U-Tube in annulus. Land Tubing hanger/sting back into PBR. 25. Pressure test tubing and annulus to 4000 psi for 30 mins. 26. Set BPV. ND BOPE. NU tree. 27. Test tree to 5000 psi, Secure well. RDMO. Post-Ritl Work: 1. Clean-up location as required. 2. R/U wireline. Recover ball and rod. 3. Perforate and stimulate Ivishak intervals as required. 4. Put on Injection. Drilling Permit.doc 7/31/2002 Page 6 of 10 ) Job 1: MIRU Hazards and Contingencies ~ The rig move will involve a moving in -35' from PSI-09. PSI-09 is scheduled to for perforating before the rig arrives. Establish a minimum distance of 5' from PSI-09 well. Discuss the move at a pre-job safety meeting and designate a spotter to ensure there is not danger of a collision. If ti appears the 5' distance will be crossed, the move should be stopped, the rig backed up, and the move on reattempted. (~..N_>~'~X:«<'M. ',' . ~ Job 2: Drill Surface Hole Hazards and Contingencies ~ No fault crossing are expected in the surface interval. ~ There are no close approach issues along the PSI-10 well path. and 32' at 700'. ~ Abnormally pressured shallow gas zones have NOT been observed in offset wells and is not expected at PSI-10. The nearest well is PSI-09 at 35' surface ~ Hole cleaning will be challenging in the 16" hole with 5" DP. Maintain adequate viscosity and high flow rates. Short trip as required. Job 3: Install 13-3/8" Surface CasinQ Hazards and Contingencies ~ It is critical that cement is circulated to surface for well integrity. 400% excess cement through the permafrost zone (and 50% excess below the permafrost) is planned. As contingency, a port collar will be run in the casing at -1000' MD to allow circulating cement to surface if the single stage is unsuccessful. ~ Cementing practices on the surface casing should meet the below criteria. 1. Pipe reciprocation during cement displacement 2. Cement - Top of lead to surface 3. Cement - Top of tail >1000' MD above shoe using 50% excess. 4. Casing Shoe Set approximately -1 OO'TVD below SV -1 sand top. Job 4: Drill Intermediate/Production Hole Hazards and ConUngencœs ~ Fault crossings are not expected along the PSI-1 0 wellpath in the intermediate hole. ~ Lost circulation is not expected in the intermediate hole section. Consult the Lost Circulation Decision Tree regarding LCM treatments and procedures if LC is encountered. ~ Increase the MW to 9.8 ppg before the WS3 @ -9300' MD/6300'TVD. Significant gas have been encountered in small stringers in the CM sequences in PSI-06 & PSI-09, requiring MW in the upper 9's and lower 10's to suppress. ~ The directional plan has been built to minimize directional work and tangent angle in the HRZ. With the current directional plan, ensure the MW is at least 10.0 ppg before entering the HRZ to aid in hole stability. ~ Differential sticking will be a problem if the drill string is left stationary for an extended period of time across the long permeable sections of the Ugnu and West Sak intervals. Minimize the time the pipe is left stationary. ~ The kick tolerance for the 12-1/4" open hole section would be 105 bbls assuming a kick while at the section TD (-11,477' MD 1 8,254' TVD). This is a worst case scenario based on a 10.0 ppg pore pressure gradient, a fracture gradient of 12.0 ppg at the 13-3/8" shoe, gauge hole, and 10.0 ppg mud in the hole. ~ Picking the 9-518" casing point is critical. Every attempt should be made to hit just above the HRZ/Zone 3 transition. The planned TD pick is in the lower HRZ. If Zone 3 is drilled, LC could be encountered due to the low pore pressure in Zone 3 (7.5 ppg). Control drilling (constant parameters) will be required. » Drilling Close Approach: All wells pass BP Close Approach guidelines. Drillìng Permit.doc 7/31/2002 Page 7 of 10 j ~) .Job 6: Install 9-5/8" Intermediate/Production CasinQ Hazards and Contingencies » Differential sticking is a concern across the Ugnu and West Sak sand intervals. Communicate individual responsibilities to all members of rig team and review connection / tripping practices to minimize the time the pipe is left stationary. » Verify the floats are holding prior to continuing cementing operations. If floats are not holding, hold pressu re and wait on cement. » Make every attempt to minimize the amount of HRl left open below the 9-5/8" shoe. The HRZ could present problems while drilling the Ivishak with a 9.0 ppg mud or during subsequent liner running operations. Job 7: Drill 8-1/2" Production Hole Hazards and Contingencies » Fault crossings are not expected along the PSI-10 wellpath in the production hole. » Lost circulation is considered to be a moderate risk because of the low pore pressure in the Ivishak. Consult the Lost Circulation Decision Tree regarding LCM treatments and procedures. » KICK TOLERANCE: The kick tolerance for the 8-1/2" open hole section would be an infinite influx assuming a kick from the Ivishak. This is a worst case scenario based on a 8.6 ppg pore pressure gradient, a fracture gradient of 10.0 ppg at the 9-5/8" shoe, and 9.0 ppg mud in the hole. )õ> Drilling Close Approach: All offset wells pass BP Close Approach guidelines. » Gas Cap Drilling: High potential for swabbed gas kicks. » Hole Instability due to exposed HRZ: Recommended practices for drilling the HRl in this area at 20° hold angle, call for a 10.0 ppg minimum mud weight. Due to the low reservoir pressure of the Ivishak, this section will be drilled with 9.0 ppg mud. Therefore, the potential exsists for any exposed HRl to start causing hole problems. ~.'."$-:~::~.>i«"*,'.'Øm'.1f.:"« Job 9: Install 7" Production Liner Hazards and Contingencies » Differential sticking could be a problem. Minimize the time the pipe is left stationary while running the liner. » Hole instability, ledges across open HRl interval. » Ensure the liner top packer is set prior to POOH. This may require going through the setting process twice. Slack off with rotation to the maximum allowable down weight, as per Baker representative. )«~"':~.^.^.....~"";""~~ ~~~~~~l'i~~~II~_I,!(.",M~ Job 12: Run Completion Hazards and Contingencies » Diesel will be used to freeze protect the well. The diesel flash point is 1 00° F. Diesel vapor pressure is - 0.1 psia at 100° F. » The injection tubing is large diameter, internally coated, and has flush joint connections. This job will be non-routine. Ensure all personnel are briefed of the potential hazards. Review all aspects of the operation with all rig team members prior to starting the job. » Ensure personnel are clear of rig floor during packer setting and when shearing out of the PBR. There will be the potential for a sudden release of stored energy with the string to jump at surface. » Freeze protection operations will also be non-routine without a RP Shear valve in the injection string. Freeze protection will be done through the BOP stack and choke manifold. Take extra precaution to avoid spills. Ensure all lines are blown down to vac truck. » Ensure MSDS sheets are available for completion fluid additives. -~t.."","...;o......_-. Drilling Pennit.doc 7/31/2002 Page 8 of 10 \, ) Job 13: ND/NU/Release RiQ Hazards and Contingencies ~ See Job 1 for adjacent well spacing. Identify hazards in a pre move meeting, and take every precaution to ensure good communication prior to beginning the rig move. Use spotters when moving the rig. ~ Non-routine freeze protect operations may leave diesel in BOPE, choke manifold, and associated lines. Take extra precaution to avoid spills. Ensure all lines are blown down to vac truck. Drillìng Permit doc 7/31/2002 Page 9 of 10 ) PSI-10 Summary of Drilling Hazards POST THIS NOTICE IN THE DOGHOUSE Surface Hole Section: . Gas hydrates are not expected in this area. Gravel beds below the Permafrost may be present. . Intermediate Hole Section: . Fault crossings are not expected along the PSI-10 wellpath in the intermediate hole. Lost circulation is not expected in the intermediate hole section. Consult the Lost Circulation Decision Tree regarding LCM treatments and procedures if LC is encountered. The directional plan has been built to minimize directional work and tangent angle in the HRZ. With the current directional plan, raise MW to 10.0 ppg before entering the HRZ to aid in hole stability. Differential sticking will be a problem if the drill string is left stationary for an extended period of time across the long permeable sections of the Ugnu and West Sak intervals. Minimize the time the pipe is left stationary. The kick tolerance for the 12-1/4" open hole section would be 105 bbls assuming a kick while at the section TD (-11,477' MD /8,254' TVD). This is a worst case scenario based on a10.0 ppg pore pressure gradient, a fracture gradient of 12.0 ppg at the 13-3/8" shoe, gauge hole, and 10.0 ppg mud in the hole. Picking the 9-5/8" casing point is critical. Every attempt should be made to hit just above the HRZ/Zone 3 transition. If Zone 3 is drilled, LC could be encountered due to the low pore pressure in Zone 3 (7.5 ppg). . . . . . Production Hole Section: . Gas cap drilling: High potential for swabbed gas kicks. Lost circulation is considered to be a moderate risk because of the low pore pressure in the Ivishak. Consult the Lost Circulation Decision Tree regarding LCM treatments and procedures. Exposed HRZ has the potential for tight hole and sloughing. Monitor cuttings for excessive shale returns. The kick tolerance for the 8-1/2" open hole section would be an infinite influx assuming a kick from the Ivishak. This is a worst case scenario based on a 8.6 ppg pore pressure gradient, a fracture gradient of 10.0 ppg at the 9-5/8" shoe, and 9.0 ppg mud in the hole. . . . CONSULT THE PSI PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION Drilling Pennit.doc 7/31/2002 Page 10 of 10 fr)10 Completion Desia ) 100,000 bblslday @ 2700 psi injection pressure XOver #1- Tbg Hanger: 7" NSCC Box X 7-5/8" STL Pin 20" x 34" Insulated Conductor @ +1- 80' 7" x 9-5/8" Baker HMC Liner Hanger, ZXP Liner Top packer, and tieback sleeve 9-5/8", 47#, L-80, BTC-M Intermediate Casing @+I- 8254' TVD; 11,471' MD Tree: 6-3/8" bore x 7-1/6" 5K, 625 Inlay, CIW H Wellhead: 13-5/8", 5K, Big Bore FMC 7" Camco 6.00" DB Nipple with Injection Valve at -2200' 7-5/8",29.7#, ST-L, IPC, Injection Tubing (wIT' accessories) 7" x 5.963" HES R Nipple 7" x 9-5/8" Baker Seal Assy 7" x 9-5/8" SABL-3 packer with 20' PBR 7" x 5.963" HES R Nipple 7" x 5.77" HES RN Nipple 7" WLEG :=i I Note: All tailpipe and accessories to be TCII 13-3/8" TAM Port Collar @ +1- 1000' MD XOver #2&3-lnjection Valve: 7-5/8" STL Box X 7" TCII Pin 7" TCII Box X 7-5/8" STL Pin 13-3/8", 68#, L-80, BTC Surface Casing @ +1- 4547' TVD; 6052' MD XOver #4-Seal Assembly: 7 -5/8" STL Box X 7" TCII Pin 7", 26#, L-80, BTC-M Injection Liner @ +1- 8606' TVD: 11,852' MD Date Comments Rev By woa woa PSI-10 WP4 Packer to Injection Zone to be Less than 250' Liner Lap to be greater than 100' 07 -03-02 07/30/02 PROJECT: GCWI WELL: PSI-10 API NO: GPB Rotary Drilling Sf:3SJ'""8r"\J-5Uf1 North Slope A.-Àka çrRTccTÑG~!ì!i~~~~~~ BPXA ~ 6300 5400 - 4500 - S' +-' .Q CJ) ëñ 3600 - ~ CJ) 0> C :.c +-' 10- 0 Z 2700 - 1800 - 900 - +-' Õ 0 0> II .c t) .S Q) -æ t) (f) DrillQuest 2.00.09.006 ~~I~f~~~ò5)East Dock) DrillQuesl 7" Liner 11851.71ft MD 8606.4011 rVD CH:k:; Total Depth: 11851.71ftMD,8606.4OftTVD fi6ü$AOft ¡VO 6$93.99 N. 3.109.93 W 8232.40 TVD. 65fiJ.41 N, 3059-46 W End Dir, Start Sail @ 20.000° : 11406.91ftMD,8188.43ftTVD Begin Dir @ 2.0ooo/100ft: 9759.86ft MD, 6882.1 Oft TVD Begin 12-1/4" Hole Proposal Data for PSI-10 WP05 Vertical Origin: Horizontal Origin: Measurement Units: North Reference: PSI slot J PSI slot J ft True North Dogleg severity: Degrees per 100 feet (US) Vertical Section Azimuth: 335.080° Vertical Section DescriptionPSI slot J Vertical Section Origin: 0.00 N,O.OO E Measured Incl. Azim. Vertical Northings Eastings Vertical Dogleg Depth Depth Section Rate 0.00 0.000 0.000 0.00 O.ooN O.OOE 0.00 34.00 0.000 0.000 34.00 O.OON O.OOE 0.00 0.000 300.00 0.000 0.000 300.00 O.ooN O.OOE 0.00 0.000 1864.80 23.472 340.000 1821.40 297.00 N 108.10 W 3]4.90 1.500 2191.87 23.4 72 340.000 2]21.40 419.42 N ] 52.66 W 444.69 0.000 2620.08 32.036 340.000 2500.00 606.63 N 220.79 W 643.1 8 2.000 3226.35 52.941 334.464 2944.74 980.28 N 381.92 W 1049.94 3.500 9759.86 52.941 334.464 6882.1 0 5684.81 N 2629.47 W 6263.4 7 0.000 11406.91 20.000 334.660 8188.43 6556.50 N 3044.82 W 7229.01 2.000 11506.91 20.000 334.660 8282.40 6587.41 N 3059.46 W 7263.21 0.000 11851.71 20.000 334.660 8606.40 6693.99 N 3]09.93 W 7381.14 0.000 Current Well Properties PSI-10 WP05 5966189.89 N, 708080.81 E 141.58 N, 323.85 E 700 18' 39.5321" N, 1480 18' 49.2921" W Well: Horizontal Coordinates: Ref. Global Coordinates: Ref. Structure: Ref. Geographical Coordinates: RKB Elevation: 51 .40ft above Mean Sea Level 51.40ft above Structure North Reference: Units: True North Feet (US) å&h  End Dir, Start Sail @ 52.941° : 3226.35ftMD,2944.74ftTVD Increase in Dir Rate @ 3.500./10Oft : 2620.08ft MD, 25oo.00ft TVD Begin Dir @ 2.0oo./100ft: 2191.87ft MD, 2121.4Oft TVD End Dir, Start Sail @ 23.472° : 1864.8OftMD,1821.4OftTVD Begin Dir @ 1.5oo./10Oft: 300.00ft MD, 300.0Oft TVD ~ \ Begin 16" Hole - ~ 0 I -2700 Scale: 1 inch = 900ft I -1800 I -900 0 Reference is True North Eastings (PSI slot J) ~e..~!:?~}l:"~~~ North Slope A._.!ka P-Blk LI !';LqA2~~~-;;:;~;~ BPXA 0 1500 - - 3000 - -:> - 0 <ñ Ci5 ~ ..c õ.. 4500 --- Q) 0 -æ (.) '';:: :.... Q) > 6000 - ,,_., ".,"''''N.'''. ~ 7500 - 0 LO or- II ..c () .£ å5 m /A 9000 - DrillQuest 2.00.09.006 1& Vertical Origin: Horizontal Origin: Measurement Units: North Reference: Dogleg severity: Vertical Section Azimuth: Vertical Section Description: Vertical Section Origin: Measured Incl. Depth 0.00 34.00 300.00 1864.80 2191.87 2620.08 3226.35 9759.86 11406.91 11506.91 11851.71 0.000 0.000 0.000 23.472 23.472 32.036 52.941 52.941 20.000 20.000 20.000 ~Begin 16" Hole ~Begin Dir @ 1.500°/1000: 300.0Oft MD, 300.DOft TVD ~oo.oo Lisburne p,->-East Dock) PSI-10 WPOS/{ DrillQues{' Proposal Data for PSI-10 WP05 PSI slot J PSI slot J ft True North Degrees per 100 feet (US) 335.080° PSI slot J 0.00 N,O.OO E Azim. Vertical Northings Eastings Vertical Dogleg Depth Section Rate 0.000 0.00 0.00 N 0.00 E 0.00 0.000 34.00 O.OON 0.00 E 0.00 0.000 0.000 300.00 O.OON 0.00 E 0.00 0.000 340.000 1821.40 297.00 N 108.10 W 314.90 1.500 340.000 2121.40 419.42 N 152.66 W 444.69 0.000 340.000 2500.00 606.63 N 220.79 W 643.18 2.000 334.464 2944.74 980.28 N 381.92 W 1049.94 3.500 334.464 6882.10 5684.81 N 2629.47 W 6263.47 0.000 334.660 8188.43 6556.50 N 3044.82 W 7229.01 2.000 334.660 8282.40 6587.41 N 3059.46 W 7263.21 0.000 334.660 8606.40 6693.99 N 3109.93 W 7381.14 0.000 Current Well Properties PSI-10 WP05 5966189.89 N, 708080.81 E 141.58 N, 323.85 E 70° 18' 39.5321" N, 1480 18' 49.2921 " W Well: Horizontal Coordinates: Ref. Global Coordinates: Ref. Structure: Ref. Geographical Coordinates: RKB Elevation: 51 AOft above Mean Sea Level 51AOft above Structure True North Feet (US) End Dir, Start Sail @ 23.472°: 1864.8OOMD,1821.4OftTVD - - - - - - - - - - - - - - - - - - - - - - - - ~AFHÕS'f,""T9'ð2.4õ¡t'hiTI'" North Reference: Units: Begin Dir @ 2.0000/100ft : 2191.87ft M D, 2121.40ft TVD Increase in Dir Rate @ 3.5000/10Oft: 2620.08ft MD, 2500.000 TVD End Dir, Start Sail @ 52.941° : 3226.35ftMD,2944.74ftTVD - - - - - - - - - - - - - - - - - - - ŠV4, :¡566.4'õttrV!) - - - - - - - - - - - - - - - - - "šV3. 397(J.4'õftrVD - - - - - - - - - - - - - - - - ŠV~.4'õttrV!) ,- -, -, ~- ~- , -, . .- ".r.-...........",~"w -. _m.... ....... T, ................ ..--... ---~ .-...~" . - - - - - - - - - - - - - ŠV~.4'õttrV!) - - - - - - - - - - - - 'TIG~.4ô«TVõ uW- - - - - - - - - - üc¡'3;'5:m2:,4'ótï'rVõ m..N i- -'" I." .t..-~ ^'..6~^ -------ÜG~<4'ótï'rVõ ~'o ¡,A 00.00 1:>$ ... -. A -. Begin Dir @ 2.0000/100ft : 9759.86ft MD, 6882.100 TVD - - WESTŠÃ.;,; 2. 6445/W¡t'rVõ -oowEsrsÃk~<¡¡j¡t'rVõ - - eM:!, 58:!4.4otTYìiõ End Dir, Start Sail @ 20.000° : 11406.91ftMD,8188.43ftTVD ~ ' Begin 8-1/2" HOI~~ PS¡.10 11; $282.40 TVO, 6587.41 N, 305$.45 IN ::-;;:" .'...4' .;." ..." Þ~U!L ¥.N.-¥.- M _t--"_lJm~..--~'J1!L V'._w"w.. I 0 1500 Scale: 1 inch = 1500ft ,. ,- - -Tt-IRZ. $1¡)ûAO!t TVD iJfTl3:TCGl, 8287.4O[t lYO GL. $348.40ft TVa '8. IJ385.4{J1tTVD - ......6SAD, 8584.40f! TVD rD, 8506.4Gf! TVD 7" Liner 11851.71ft MD 8606.400 TVD '.',.... ".. ,. 'A @ ..~.~.~...~... -~--1 PS¡.i(} TD: $506.40 TVD, 5593.$9 N, 3i[}9.93 W ".""."'" Total Depth: 11851.71ftMD,8606.4OOTVD I I I 4500 6000 7500 Section Azimuth: 335.080° (True North) Vertical Section (PSI slot J) I 3000 spe"""r"1y-sun North Slope A.Jka OfULLING ¡\~:t>:~~~:~: BPXA Lisburne p_.~East Dock) DrillQuesl PSI-10 WP05 y",1W Single Well Target Data for PSI-10 WP05 Measurement Units: it Coordinate Target Point TVD Northings Eastings SSTVD Northings Eastings Target Name Type ASPY ASP X Shape PSI-lO Tl Entry Point 8282.40 6587.41 N 3059.46 W 8231.00 5972690.00 N 704840.00 E Point PSI-lO TD Entry Point 8606.40 6693.99 N 3109.93 W 8555.00 5972795.14 N 704786.60 E Polygon Driller's Poly @ 95% 6773.17 N 8555.00 5972874.84 N 704804.41 E Boundary Point A 8606.40 3089.91 W B 8606.40 6750.04 N 3064.51 W 8555.00 5972852.43 N 704830.44 E C 8606.40 6725.60 N 3047.66 W 8555.00 5972828.46 N 704847.97 E D 8606.40 6698.46 N 3036.40 W 8555.00 5972801.64 N 704859.97 E E 8606.40 6665.71 N 3030.64 W 8555.00 5972769.07 N 704866.64 E F 8606.40 6624.72 N 3034.84 W 8555.00 5972727.98 N 704863.58 E G 8606.40 6603.08 N 3044.45 W 8555.00 5972706.08 N 704854.57 E H 8606.40 6588.37 N 3062.35 W 8555.00 5972690.88 N 704837.08 E I 8606.40 6586.10 N 3085.42 W 8555.00 5972687.97 N 704814.09 E J 8606.40 6593.35 N 3107.47 W 8555.00 5972694.61 N 704791.84 E K 8606.40 6616.46 N 3140.52 W 8555.00 5972716.79 N 704758.17 E L 8606.40 6642.04 N 3161.77 W 8555.00 5972741.77 N 704736.21 E M 8606.40 6668.92 N 3175.37 W 8555.00 5972768.27 N 704721.87 E N 8606.40 6698.79 N 3183.03 W 8555.00 5972797.91 N 704713.39 E 0 8606.40 6734.39 N 3183.55 W 8555.00 5972833.48 N 704711.88E P 8606.40 6754.89 N 3179.34 W 8555.00 5972854.09 N 704715.52 E Q 8606.40 6775.27 N 3169.51 W 8555.00 5972874.74 N 704724.79 E R 8606.40 6788.94 N 3151.61 W 8555.00 5972888.90 N 704742.30 E S 8606.40 6790.73 N 3128.88 W 8555.00 5972891.32 N 704764.97 E T 8606.40 6783.49 N 3107.46 W 8555.00 5972884.67 N 704786.58 E PSI-lO TD Geo Circle Entry Point 8606.40 6693.99 N 3109.93 W 8555.00 5972795.14 N 704786.60 E Circle PSI-10 WP05 Formations Measured Vertical Sub-Sea Depth Depth Depth Dip Dip Dir. Formation Name (ft) (ft) (ft) (Deg) (Deg) 1953.11 1902.40 1851.00 0.000 0.000 BPERMAFROST 4257.91 3566.40 3515.00 0.000 0.000 SV4 4928.29 3970.40 3919.00 0.000 0.000 SV3 5261.82 4171.40 4120.00 0.000 0.000 SV2 5885.74 4547.40 4496.00 0.000 0.000 SV1 6707.13 5042.40 4991.00 0.000 0.000 UG4 7072.19 5262.40 5211.00 0.000 0.000 UG3 8142.48 5907.40 5856.00 0.000 0.000 UG1 9035.22 6445.40 6394.00 0.000 0.000 WEST SAK 2 9343.86 6631.40 6580.00 0.000 0.000 WEST SAK 1 9680.71 6834.40 6783.00 0.000 0.000 CM3 11312.65 8100.40 8049.00 0.000 0.000 THRZ 11512.23 8287.40 8236.00 0.000 0.000 BHRZ/LCU/TZ3/TCGL 11577.15 8348.40 8297.00 0.000 0.000 TZ2C/BCGL 11617.59 8386.40 8335.00 0.000 0.000 TZ2B/23SB 11828.29 8584.40 8533.00 0.000 0.000 BSAD 11851.71 8606.40 8555.00 0.000 0.000 TD DrillQuest 2.00.09.006 Sper.)-Sun Drilling Se.}ices Proposal Data - PSI-10 WPS - PSI-10 WP05 001 = 5.6 APPROVED PLAN MD Delta Inclin. Azimuth TVD Delta Northings Eastings Dogleg A. Build A.Turn Toolface VS (335°) (ft) MD (ft) (°) (°) (ft) TVD (ft) (ft) (ft) (0/100ft) (0/10Oft) (°/1 OOft) (°) (ft) .1 ........ ... ....... .. Î"" ''''' ....... .... .m..... n. ........... ........... ............,... . n.... . .n. 1 0.00 0.00 0.00. 0.00 0.00 0.00: . .. ö. ~o.d.. 0.0 .. ... .: 34..:6~:! ::.:: ... n.... ';"' . .......: .:ö::.qoi: ::.... .: .~~~9.Ö:':: ........... .... .. .. 2 34.00 0.00 . . 2~::.66.1 0.00 0.00: 0.00 0.00 0.00 0.0 .1. ...... ... . u ... ...." .... .. ... . .... 3' 300.00 266.:~0.L. 0.00; ...... .~.:.o.<?i... ... 3~~.00!.. 0.00 0.00: 0.00: 0.00. ...O'~°l... 0.00 0.0 . ..... I.. ...... ...... .. m...n ......1 .. .. ... .... .n.. 4' i 1 864.80 1564.80 23.47. 340.00 1821 .40 ' ...1521.40 i 297.00 N. 108.10 W' 1.50: 1.50: 0.00. 340.00 314.9 . ..... ..... .. ..... ....3.~o:ooj .~12.<~~:.. .....n ... ... .m.. . . .. .. 5' I 2191.87 327.06: 23.47' 300.00: 419.42N: 152.66 W 0.00: 0.00: 0.00. 0.00 444.7 I u. ........ ,n ... .n.. ... .. . .n.... .¡... ... ......n .... 6' I 2620.08. 428.22, 32.04. 340.001 2500.00 378.60: 606.63 N; 220.79 W 2.00 2.00; 0.00. 0.00. 643.2 ..... m.......... 7 3226.35 606.26 52.94 334.46 2944.74 444.74 980.28 N 381 .92 W 3.50 3.45 -0.91 347.72 1049.9 8 9759.86 6533.52 52.94 334.46 6882.10 3937.36 5684.81 N 2629.47 W 0.00 0.00 0.00 0.00 6263.5 9 11406.91 1647.05 20.00 334.66 8188.43 1306.33 6556.50 N 3044.82 W 2.00 -2.00 0.01 179.88 7229.0 10T 11506.91 100.00 20.00 334.66 8282.40 93.97 6587.41 N 3059.46 W 0.00 0.00 0.00 0.00 7263.2 ..m. .._-,--,--,-- -.....-.....-................... --~_. .......................................---.--.,-"".- 0.001 ~------".,- 11' 11851.71 344.79: 20.00 334.66 8606.40 324.00 6693.99 N. 3109.93 W 0.00 0.00 0.00 7381.1 25 July, 2002 -13:18 -1 - DrillQuest A Lisburne PSI "'ast Dock), Slot PSI slot J PSI-10 WPS - PSI-10 WP05 ~ Revised: 25 July, 2002 PROPOSAL REPORT 29 July, 2002 ~ Surface Coordinates: 5966189.89 N, 708080.81 E (700 18' 39.5321" N, 1480 18' 49.2921" W) Surface Coordinates relative to Project H Reference: 966189.89 N, 208080.81 E (Grid) Surface Coordinates relative to Structure: 141.58 N, 323.85 E (True) Kelly Bushing: 51.40ft above Mean Sea Level 5pE!""""""~-!5UI! DRILLING. SERVIC:ES A HaUiburtønCompany Proposal Ref: pro 11253 Sperry-Sun Drilling Services Proposal Report for PSI-1O WPS - PSI-10 WP05 Revised: 25 July, 2002 BPXA North Slope Alaska Lisburne PSI (East Dock) Measured Sub-Sea Vertical Local Coordinates Global Coordinates ertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) 0.00 0.000 0.000 -51.40 0.00 O.OON 0.00 E 5966189.89 N 708080.81 E 0.00 Begin 16" Hole 34.00 0.000 0.000 -17.40 34.00 0.00 N 0.00 E 5966189.89 N 7°880:81 E 0.000 0.00 300.00 0.000 0.000 248.60 300.00 O.OON 0.00 E 5966189.89 N 708080.81 E 0.000 0.00 Begin Dir @ 1.5000/100ft: 300.00ft MD, 300.00ft TVD 400.00 1.500 340.000 348.59 399.99 5966191.11 N 708080.33 E 1.500 1.30 500.00 3.000 340.000 448.51 499.91 5966194.76 N 708078.88 E 1.500 5.22 .~ 600.00 4.500 340.000 548.29 708076.48 E 1.500 11.73 700.00 6.000 340.000 647.87 708073.11 E 1.500 20.85 800.00 7.500 340.000 747.17 708068.79 E 1.500 32.56 900.00 9.000 340.000 846.14 708063.51 E 1.500 46.85 1000.00 10.500 340.000 944.69 708057.28 E 1.500 63.73 1100.00 12.000 340.000 1042.76",,"^ 28.55 W 5966267.51 N 708050.10 E 1.500 83.16 1200.00 13.500 340.000 1140.30 36.10 W 5966288.03 N 708041 .98 E 1.500 105.15 1300.00 15.000 340.000 123722 44.52 W 5966310.91 N 708032.92 E 1.500 129.67 1400.00 16.500 340.000 1333.46 53.80 W 5966336.15 N 708022.94 E 1.500 156.72 1500.00 18.000 340.000 1428.96 63.94 W 5966363.73 N 708012.03 E 1.500 186.26 1600.00 19.500 1523.65 1575.05 205.88 N 74.93 W 5966393.62 N 708000.20 E 1.500 218.29 1700.00 21 .000 1617.46 1668.86 238.40 N 86.77 W 5966425.80 N 707987.47 E 1.500 252.77 1800.00 22.500 1710.34 1761.74 273.22 N 99.45 W 5966460.25 N 707973.83 E 1.500 289.69 1864.80 23.472 1770.00 1821.40 297.00 N 108.10W 5966483.78 N 707964.52 E 1.500 314.90 End Dir, Start Sail @ 23.472° : 1864.80ftMD,1821.40ftTVD 1900.00 23.472 340.000 1802.28 1853.68 310.18 N 112.90 W 5966496.82 N 707959.36 E 0.000 328.87 1953.11 23.472 340.000 1851.00 1902.40 330.06 N 120.13 W 5966516.49 N 707951.58 E 0.000 349.94 BPERMAFROST -.-I" 2000.00 23.472 340.000 1894.01 1945.41 347.61 N 126.52 W 5966533.86 N 707944.71 E 0.000 368.55 2100.00 23.472 340.000 1985.74 2037.14 385.03 N 140.14 W 5966570.89 N 707930.05 E 0.000 408.23 2191.87 23.472 340.000 2070.00 2121.40 419.42 N 152.66 W 5966604.92 N 707916.59 E 0.000 444.69 Begin Dir @ 2.0000/100ft: 2191.87ft MD, 2121.40ft TVD 2200.00 23.635 340.000 2077.46 2128.86 422.47 N 153.77 W 5966607.94 N 707915.40 E 2.000 447.93 2300.00 25.635 340.000 2168.35 2219.75 461.64 N 168.02 W 5966646.70 N 707900.06 E 2.000 489.46 2400.00 27.635 340.000 2257.73 2309.13 503.76 N 183.35 W 5966688.38 N 707883.57 E 2.000 534.12 2500.00 29.635 340.000 2345.50 2396.90 548.79 N 199.74 W 5966732.94 N 707865.94 E 2.000 581.86 2600.00 31 .635 340.000 2431.54 2482.94 596.67 N 217.17 W 5966780.32 N 707847.19 E 2.000 632.63 2620.08 32.036 340.000 2448.60 2500.00 606.63 N 220.79 W 5966790.17 N 707843.29 E 2.000 643.18 Increase in Dir Rate @ 3.5000/100ft: 2620.08ft MD, 2500.00ft TVD 29 July, 2002 - 9:17 Page 2 of 11 Dri/IQuest 2.00.09.006 Sperry-Sun Drilling Services '8' Proposal Report for PSI-10 WPS - PSI-10 WP05 Revised: 25 July, 2002 BPXA North Slope Alaska Lisburne PSI (East Dock) Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings Comment (ft) (ft) (ft) (ft) (ft) 2700.00 34.774 338.957 2515.31 2566.71 647.82 N 3.500 687.05 2800.00 38.210 337.838 2595.69 2647.09 703.10 N 3.500 746.41 2900.00 41 .656 336.879 2672.36 2723.76 762.32 N 3.500 810.54 3000.00 45.108 336.040 2745.03 2796.43 825.28 N 3.500 879.19 3100.00 48.566 335.297 2813.43 2864.83 891.72 N 3.500 952.12 ~ 3200.00 52.028 334.630 2877.30 2928.70 707681.38 E 3.500 1029.04 3226.35 52.941 334.464 2893.34 2944.74 707671 .88 E 3.500 1049.94 End Dir, Start Sail @ 52.9410 : 3226.35ftM D ,2944.7 4ftTVD 3300.00 52.941 334.464 2937.73 2989.13 5967211.53 N 707645.08 E 0.000 1108.71 3400.00 52.941 334.464 2997.99 3049.39 5967282.55 N 707608.70 E 0.000 1188.51 3500.00 52.941 334.464 3058.26 31 5967353.58 N 707572.32 E 0.000 1268.30 3600.00 52.941 334.464 3118.52.,ø< 'Wtf4~¡;a49.34 N 510.45 W 5967424.60 N 707535.94 E 0.000 1348.10 3700.00 52.941 334.464 3178.78 1321.34 N 544.85 W 5967495.63 N 707499.55 E 0.000 1427.90 3800.00 52.941 334.464 3239.05 1393.35 N 579.25 W 5967566.65 N 707463.17 E 0.000 1507.69 3900.00 52.941 334.464 3299.31 1465.35 N 613.66 W 5967637.68 N 707426.79 E 0.000 1587.49 4000.00 52.941 334.464 3359.58 1537.36 N 648.06 W 5967708.70 N 707390.41 E 0.000 1667.29 4100.00 52.941 3471.24 1609.37 N 682.46 W 5967779.73 N 707354.02 E 0.000 1747.08 4200.00 52.941 3531.50 1681.37 N 716.86 W 5967850.75 N 707317.64 E 0.000 1826.88 4257.91 52.941 3566.40 1723.07 N 736.78 W 5967891.88 N 707296.57 E 0.000 1873.09 SV4 4300.00 52.941 3591.77 1753.38 N 751.26 W 5967921.78 N 707281.26 E 0.000 1906.68 4400.00 52.941 3652.03 1825.38 N 785.66 W 5967992.80 N 707244.88 E 0.000 1986.47 4500.00 52.941 334.464 3660.90 3712.30 1897.39 N 820.06 W 5968063.83 N 707208.49 E 0.000 2066.27 '-/ 4600.00 52.941 334.464 3721.16 3772.56 1969.40 N 854.46 W 5968134.85 N 707172.11 E 0.000 2146.07 4700.00 52.941 334.464 3781.42 3832.82 2041.40 N 888.86 W 5968205.88 N 707135.73 E 0.000 2225.86 4800.00 52.941 334.464 3841 .69 3893.09 2113.41 N 923.26 W 5968276.90 N 707099.35 E 0.000 2305.66 4900.00 52.941 334.464 3901.95 3953.35 2185.41 N 957.66 W 5968347.93 N 707062.96 E 0.000 2385.46 4928.29 52.941 334.464 3919.00 3970.40 2205.78 N 967.39 W 5968368.02 N 707052.67 E 0.000 2408.03 SV3 5000.00 52.941 334.464 3962.22 4013.62 2257.42 N 992.06 W 5968418.96 N 707026.58 E 0.000 2465.25 5100.00 52.941 334.464 4022.48 4073.88 2329.43 N 1026.46 W 5968489.98 N 706990.20 E 0.000 2545.05 5200.00 52.941 334.464 4082.74 4134.14 2401.43 N 1060.86 W 5968561.01 N 706953.82 E 0.000 2624.85 5261.82 52.941 334.464 4120.00 4171.40 2445.95 N 1082.13 W 5968604.91 N 706931 .33 E 0.000 2674.18 SV2 29 July, 2002 - 9:17 Page 3 of 11 DrillQuest 2.00.09.006 Sperry-Sun Drilling Services Proposal Report for PSI-1 0 WPS - PSI-10 WP05 Revised: 25 July, 2002 BPXA North Slope Alaska Lisburne PSI (East Dock) Measured Sub-Sea Vertical Local Coordinates Global Coordinates ertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) 5300.00 52.941 334.464 4143.01 4194.41 2473.44 N 1095.26 W 5968632.03 N 0.000 2704.64 5400.00 52.941 334.464 4203.27 4254.67 2545.44 N 1129.66W 5968703.06 N 0.000 2784.44 5500.00 52.941 334.464 4263.54 4314.94 2617.45 N 1164.06 W 5968774.08 N 0.000 2864.24 5600.00 52.941 334.464 4323.80 4375.20 2689.46 N 1198.46 W 5968845.11 N 0.000 2944.03 5700.00 52.941 334.464 4384.06 4435.46 2761.46 N 1232.86 W 5968916.13 N 0.000 3023.83 ~ 5800.00 52.941 334.464 4444.33 6 W'~'">~v;5968987 .16 N 706735.52 E 0.000 3103.63 5885.74 52.941 334.464 4496.00 '\lJié'5969048.05 N 706704.33 E 0.000 3172.05 SV1 5900.00 52.941 334.464 4504.59 5969058.18 N 706699.14 E 0.000 3183.42 6000.00 52.941 334.464 4564.86 5969129.21 N 706662.76 E 0.000 3263.22 6051 .68 52.941 334.464 4596.00 5969165.91 N 706643.96 E 0.000 3304.46 Begin 12-1/4" Hole 13 3/8" Casing 6100.00 52.941 334.464 4625.12"", 1370.46 W 5969200.23 N 706626.38 E 0.000 3343.02 6200.00 52.941 334.464 4685.38 1404.86 W 5969271.26 N 706589.99 E 0.000 3422.81 6300.00 52.941 334.464 4745.65 1439.26 W 5969342.28 N 706553.61 E 0.000 3502.61 6400.00 52.941 334.464 4805.91 1473.67 W 5969413.31 N 706517.23 E 0.000 3582.41 6500.00 52.941 334.464 4866.18 1508.07 W 5969484.33 N 706480.85 E 0.000 3662.21 6600.00 52.941 4926.44 4977.84 3409.52 N 1542.47 W 5969555.36 N 706444.46 E 0.000 3742.00 6700.00 52.941 986.70 5038.10 3481.52 N 1576.87 W 5969626.38 N 706408.08 E 0.000 3821.80 6707.13 52.941 4991 .00 5042.40 3486.66 N 1579.32 W 5969631.45 N 706405.49 E 0.000 3827.49 UG4 6800.00 52.941 5046.97 5098.37 3553.53 N 1611 .27 W 5969697.41 N 706371.70 E 0.000 3901.60 6900.00 52.941 5107.23 5158.63 3625.53 N 1645.67 W 5969768.43 N 706335.32 E 0.000 3981.39 7000.00 52.941 334.464 5167.50 5218.90 3697.54 N 1680.07 W 5969839.46 N 706298.93 E 0.000 4061.19 7072.19 52.941 334.464 5211.00 5262.40 3749.52 N 1704.90 W 5969890.73 N 706272.67 E 0.000 4118.79 UG3 7100.00 52.941 334.464 5227.76 5279.16 3769.55 N 1714.47 W 5969910.48 N 706262.55 E 0.000 4140.99 7200.00 52.941 334.464 5288.02 5339.42 3841.55 N 1748.87 W 5969981.51 N 706226.17 E 0.000 4220.78 7300.00 52.941 334.464 5348.29 5399.69 3913.56 N 1783.27 W 5970052.53 N 706189.79 E 0.000 4300.58 7400.00 52.941 334.464 5408.55 5459.95 3985.56 N 1817.67 W 5970123.56 N 706153.41 E 0.000 4380.38 7500.00 52.941 334.464 5468.82 5520.22 4057.57 N 1852.07 W 5970194.58 N 706117.02 E 0.000 4460.17 7600.00 52.941 334.464 5529.08 5580.48 4129.58 N 1886.47 W 5970265.61 N 706080.64 E 0.000 4539.97 7700.00 52.941 334.464 5589.34 5640.74 4201.58 N 1920.87 W 5970336.63 N 706044.26 E 0.000 4619.77 7800.00 52.941 334.464 5649.61 5701 .01 4273.59 N 1955.27 W 5970407.66 N 706007.88 E 0.000 4699.56 29 July, 2002 - 9:17 Page 4 of 11 DrillQuest 2.00.09.006 1> Sperry-Sun Drilling Services Proposal Report for PSI-10 WPS - PSI-10 WP05 Revised: 25 July, 2002 BPXA North Slope Alaska Lisburne PSI (East Dock) Measured Sub-Sea Vertical Local Coordinates Global Coordinates ertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) 7900.00 52.941 334.464 5709.87 5761 .27 4345.59 N 1989.67 W 5970478.69 N 0.000 4779.36 8000.00 52.941 334.464 5770.14 5821 .54 4417.60 N 2024.07 W 5970549.71 N 0.000 4859.16 8100.00 52.941 334.464 5830.40 5881.80 4489.61 N 2058.47 W 5970620.74 N 0.000 4938.95 8142.48 52.941 334.464 5856.00 5907.40 4520.19 N 2073.09 W 5970650.91 N 0.000 4972.85 UG1 8200.00 52.941 334.464 5890.66 5942.06 4561.61 N 2092.87 W 5970691.76 N 0.000 5018.75 ~. 8300.00 52.941 334.464 5950.93 6002.33 4633.62 N . 7 W""",,þ970762. 79 N 705825.96 E 0.000 5098.55 8400.00 52.941 334.464 6011.19 6062.59 47031122 N 7 "\jrlt"5970833.81 N 705789.58 E 0.000 5178.34 8500.00 52.941 334.464 6071 .46 6122.86 471ii;¡t;$,N 5970904.84 N 705753.20 E 0.000 5258.14 8600.00 52.941 334.464 6131.72 6183.12 4849.64 N 5970975.86 N 705716.82 E 0.000 5337.94 8700.00 52.941 334.464 6191.98 6243.38 4921.64 N 5971046.89 N 705680.43 E 0.000 5417.73 8800.00 52.941 334.464 6252.25 4993.65 N 2299.28 W 5971117.91 N 705644.05 E 0.000 5497.53 8900.00 52.941 334.464 6312.5l".." >wvi065.65 N 2333.68 W 5971188.94 N 705607.67 E 0.000 5577.33 9000.00 52.941 334.464 6372.78 5137.66 N 2368.08 W 5971259.96 N 705571 .29 E 0.000 5657.12 9035.22 52.941 334.464 6394.00 5163.02 N 2380.19 W 5971284.98 N 705558.47 E 0.000 5685.23 WEST SAK 2 9100.00 52.941 334.464 6433.04 5209.67 N 2402.48 W 5971330.99 N 705534.91 E 0.000 5736.92 9200.00 52.941 6493.30. 6544.70 5281.67 N 2436.88 W 5971402.01 N 705498.52 E 0.000 5816.72 9300.00 52.941 6553.57 6604.97 5353.68 N 2471.28 W 5971473.04 N 705462.14 E 0.000 5896.51 9343.86 52.941 580.00 6631.40 5385.26 N 2486.37 W 5971504.19 N 705446.18 E 0.000 5931.51 WEST SAK 1 9400.00 52.941 6613.83 6665.23 5425.68 N 2505.68 W 5971544.06 N 705425.76 E 0.000 5976.31 9500.00 52.941 6674.10 6725.50 5497.69 N 2540.08 W 5971615.09 N 705389.38 E 0.000 6056.11 9600.00 52.941 334.464 6734.36 6785.76 5569.70 N 2574.48 W 5971686.11 N 705352.99 E 0.000 6135.90 9680.71 52.941 334.464 6783.00 6834.40 5627.81 N 2602.24 W 5971743.44 N 705323.63 E 0.000 6200.31 CM3 .~ 9700.00 52.941 334.464 6794.62 6846.02 5641.70 N 2608.88 W 5971757.14 N 705316.61 E 0.000 6215.70 9759.86 52.941 334.464 6830.70 6882.10 5684.81 N 2629.47 W 5971799.66 N 705294.83 E 0.000 6263.47 Begin Dir @ 2.000o/100ft : 9759.86ft MD, 6882.1 Oft TVD 9800.00 52.138 334.466 6855.11 6906.51 5713.55 N 2643.21 W 5971828.01 N 705280.31 E 2.000 6295.33 9900.00 50.138 334.472 6917.85 6969.25 5783.81 N 2676.76 W 5971897.31 N 705244.81 E 2.000 6373.18 10000.00 48.138 334.478 6983.27 7034.67 5852.06 N 2709.35 W 5971964.63 N 705210.35 E 2.000 6448.80 10100.00 46.138 334.484 7051 .29 7102.69 5918.20 N 2740.93 W 5972029.87 N 705176.95 E 2.000 6522.10 10200.00 44.138 334.491 7121 .83 7173.23 5982.17 N 2771 .45 W 5972092.97 N 705144.66 E 2.000 6592.97 10300.00 42.138 334.499 7194.80 7246.20 6043.88 N 2800.90 W 5972153.84 N 705113.52 E 2.000 6661.34 29 July, 2002 - 9: 17 Page 5 of 11 DrillQuest 2.00.09.006 Sperry-Sun Drilling Services Proposal Report for PSI-tO WPS - PSI-tO WP05 Revised: 25 July, 2002 BPXA North Slope Alaska Lisburne PSI (East Dock) Measured Sub-Sea Vertical Local Coordinates Global Coordinates Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) 10400.00 40.138 334.506 7270.10 7321 .50 6103.26 N 2.000 6727.12 10500.00 38.138 334.515 7347.66 7399.06 6160.23 N 2.000 6790.23 10600.00 36.138 334.525 7427.38 7478.78 6214.73 N 2.000 6850.60 10700.00 34.138 334.535 7509.15 7560.55 6266.69 N 2.000 6908.15 10800.00 32.138 334.546 7592.88 7644.28 6316.04 N 2.000 6962.81 ........." 1 0900.00 30.138 334.559 7678.47 2468.36 N 704952.83 E 2.000 7014.52 11000.00 28.138 334.574 7765.81 5972511.73 N 704930.71 E 2.000 7063.20 11100.00 26.138 334.590 7854.80 5972552.37 N 704910.00 E 2.000 7108.81 11200.00 24.138 334.609 7945.32 5972590.23 N 704890.72 E 2.000 7151.29 11300.00 22.138 334.632 8037.27 5972625.25 N 704872.90 E 2.000 7190.58 11312.65 21 .885 334.635 8049.00 3030.39 W 5972629.47 N 704870.75 E 2.000 7195.32 THRZ 11400.00 20.138 334.658 8130.54"""0 3043.81 W 5972657.39 N 704856.56 E 2.000 7226.64 11406.91 20.000 334.660 8137.03 3044.82 W 5972659.51 N 704855.49 E 2.000 7229.01 End Dir, Start Sail @ 20.000° : 11406.91ftMD,8188.43ftTVD 11477.23 20.000 334.660 8203.11 6578.24 N 3055.11 W 5972680.95 N 704844.60 E 0.000 7253.06 Begin 8-1/2" Hole 9 5/8" Casing 11500.00 20.000 8275.90 6585.27 N 3058.45 W 5972687.89 N 704841 .07 E 0.000 7260.85 11506.91 20.000 231.00 8282.40 6587.41 N 3059.46 W 5972690.00 N 704840.00 E 0.000 7263.21 Target - PSI-10 T1, Drillers 11512.23 20.000 8236.00 8287.40 6589.06 N 3060.24 W 5972691.62 N 704839.18 E 0.000 7265.03 BH RZlLCUfTZ3fTCGL 11577.15 20.000 8297.00 8348.40 6609.12 N 3069.74 W 5972711 .42 N 704829.12 E 0.000 7287.24 TZ2C/BCGL 11600.00 20.000 8318.47 8369.87 6616.19 N 3073.09 W 5972718.39 N 704825.58 E 0.000 7295.05 11617.59 20.000 8335.00 8386.40 6621.62 N 3075.66 W 5972723.75 N 704822.86 E 0.000 7301 .07 TZ2B/23SB ~ 11700.00 20.000 334.660 8412.44 8463.84 6647.10 N 3087.72 W 5972748.88 N 704810.09 E 0.000 7329.25 11800.00 20.000 334.660 8506.41 8557.81 6678.01 N 3102.36 W 5972779.37 N 704794.60 E 0.000 7363.45 11828.29 20.000 334.660 8533.00 8584.40 6686.75 N 3106.50 W 5972788.00 N 704790.22 E 0.000 7373.13 BSAD 11851.71 20.000 334.660 8555.00 8606.40 6693.99 N 3109.93 W 5972795.14 N 704786.60 E 0.000 7381.14 Total Depth: 11851.71ftMD,8606.40ftTVD 7" Liner TO Target - PSI-1 0 TO Geo Circle, 150.0C Radius., Geological 29 July, 2002 - 9:17 Page 6 of 11 DrillQuest 2.00.09.006 North Slope Alaska Sperry-Sun Drilling Services Proposal Report for PSI-10 WPS - PSI-10 WP05 Revised: 25 July, 2002 All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to PSI slot J. Northings and Eastings are relative to PSI slot J. Magnetic Declination at Surface is 26.488° (24-Jul-02) The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from PSI slot J and calculated along an Azimuth of 335.080° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 11851.71 ft., The Bottom Hole Displacement is 7381.14ft., in the Direction of 335.081 ° (True). Comments Measured Depth (ft) 0.00 300.00 1864.80 2191.87 2620.08 3226.35 6051.68 9759.86 11406.91 11477.23 11851.71 29 July, 2002 - 9:17 Station Coordinates TVD Northings Eastings (ft) (ft) (ft) ~tlJ.äf> 0.00 E 0.00 E 108.10 W 152.66 W 220.79 W 980.28 N 381.92 W 3014.69 N 1353.84 W 5684.81 N 2629.47 W 6556.50 N 3044.82 W 6578.24 N 3055.11 W 8606.40 6693.99 N 3109.93 W Comment Begin 16" Hole Begin Dir @ 1.5000/100ft: 300.00ft MD, 300.00ft TVD End Dir, Start Sail @ 23.472°: 1864.80ftMD,1821.40ftTVD Begin Dir @ 2.0000/100ft : 2191.87ft MD, 2121.40ft TVD Increase in Dir Rate @ 3.5000/100ft: 2620.08ft MD, 2500.00ftTVD End Dir, Start Sail @ 52.941°: 3226.35ftMD,2944.74ftTVD Begin 12-1/4" Hole Begin Dir @ 2.0000/100ft : 9759.86ft MD, 6882.1 Oft TVD End Dir, Start Sail @ 20.000° : 11406.91ftMD,8188.43ftTVD Begin 8-1/2" Hole Total Depth: 11851.71ftMD,8606.40ftTVD Page 7 of 11 BPXA Lisburne PSI (East Dock) ~' DrillQuest 2.00.09.006 Sperry-Sun Drilling Services Proposal Report for PSI-10 WPS - PSI-10 WP05 Revised: 25 July, 2002 North Slope Alaska Formation Tops Formati on Plane Profile Penetration Poi n t (Below Well Origin) Measured Vertical Sub-Sea Sub-Sea Dip Dip Dir. Depth Depth Depth Eastings Formation Name (ft) Deg. Deg. (ft) (ft) (ft) 1851.00 0.000 0.000 1953.11 1902.40 1851.00 \I~ERMAFROST 3515.00 0.000 0.000 4257.91 3566.40 3515.00 SV4 3919.00 0.000 0.000 4928.29 3970.40 3919.00 SV3 4120.00 0.000 0.000 5261.82 4171.40 4120.00 SV2 4496.00 0.000 0.000 5885.74 4547.40 4496.00 SV1 4991.00 0.000 0.000 6707.13 5042.40 ";'¡1;1_86.66 N 1579.32 W UG4 5211.00 0.000 0.000 7072.19 5262.40 3749.52 N 1704.90 W UG3 5856.00 0.000 0.000 8142.48 5907.40 4520.19 N 2073.09 W UG1 6394.00 0.000 0.000 9035.22 6445.40 5163.02 N 2380.19 W WEST SAK 2 6580.00 0.000 0.000 9343.86 6631.40 ;\9580.00 5385.26 N 2486.37 W WEST SAK 1 6783.00 0.000 9680.71 6834.40 6783.00 5627.81 N 2602.24 W CM3 8049.00 0.000 11312.65 8100.40 8049.00 6526.05 N 3030.39 W THRZ 8236.00 0.000 1.1512.23 8287.40 8236.00 6589.06 N 3060.24 W BHRZlLCUfTZ3fTCGL 8297.00 0.000 1577.15 8348.40 8297.00 6609.12 N 3069.74 W TZ2C/BCGL 8335.00 0.000 -617.59 8386.40 8335.00 6621.62 N 3075.66 W TZ2B/23SB 8533.00 0.000 11828.29 8584.40 8533.00 6686.75 N 3106.50 W BSAD 8555.00 0.000 11851.71 8606.40 8555.00 6693.99 N 3109.93 W TD 29 July, 2002 - 9:17 Page 8 of 11 BPXA Lisburne PSI (East Dock) DrillQuest 2.00.09.006 Sperry-Sun Drilling Services Proposal Report for PSI-10 WPS - PSI-10 WP05 Revised: 25 July, 2002 Fro m Measured Vertical Depth Depth (ft) (ft) BPXA Lisburne PSI (East Dock) North Slope Alaska Casing details To Measured Vertical Depth Depth (ft) (ft) Casing Detail <Surface> <Surface> <Surface> <Surface> <Surface> <Surface> 6051.68 11477.23 11851.71 4647.40 8254.51 8606.40 13 3/8" Casing 9 5/8" Casing 7" Liner .....",1 Targets associated with this well path PSI-10T1 Target Entry Coordinates TVD Northings Eastings Target Target (ft) (ft) (ft) Shape Type 8282.40 6587.41 N 3059.46 W Point Drillers Mean Sea Level/Global Coordinates: 8231.00 5972690.00 N 704840.00 E Geographical Coordinates: 70019' 44.3160" N 148020' 18.6149" W 8606.40 6693.99 N 3109.93 W Polygon Drillers Mean Sea Level/Global Coordinates: 8555.00 5972795.14 N 704786.60 E Geographical Coordinates: 700 19' 45.3641" N 148020' 20.0897" W Target Boundary Point #1 8606.40 6773.17 N 3089.91 W #2 8606.40 6750.04 N 3064.51 W #3 8606.40 6725.60 N 3047.66 W #4 8606.40 6698.46 N 3036.40 W #5 8606.40 6665.71 N 3030.64 W #6 8606.40 6624.72 N 3034.84 W #7 8606.40 6603.08 N 3044.45 W #8 8606.40 6588.37 N 3062.35 W #9 8606.40 6586.10 N 3085.42 W #10 8606.40 6593.35 N 3107.47 W #11 8606.40 6616.46 N 3140.52 W #12 8606.40 6642.04 N 3161.77 W #13 8606.40 6668.92 N 3175.37 W #14 8606.40 6698.79 N 3183.03 W #15 8606.40 6734.39 N 3183.55 W #16 8606.40 6754.89 N 3179.34 W Page 9 of 11 DrillQuest 2.00.09.006 Target Name PSI-10 TD Driller' 29 July, 2002 - 9:17 North Slope Alaska Target Name 29 July, 2002 - 9: 17 Sperry-Sun Drilling Services Proposal Report for PSI-1O WPS - PSI-10 WP05 Revised: 25 July, 2002 Mean Sea Level/Global Coordinates #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20 Geographical Coordinates #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 Page 10 of 11 #17 #18 #19 #20 8555.00 8555.00 8555.00 8555.00 8555.00 8555.00 8555.00 8555.00 8555.00 8555.00 8555.00 8555.00 8555.00 8555.00 8555.00 8555.00 8555.00 8555.00 8555.00 8555.00 Entry Coordin Northings (ft) 6775.27 N 6788.94 N \fiff;i!90.73 N £783.49 N 5972874.84 N 5972852.43 N 5972828.46 N 5972801 .64 N 5972769.07 N 5972727.98 N 5972706.08 N 5972690.88 N 5972687.97 N 5972694.61 N 5972716.79 N 5972741.77 N 5972768.27 N 5972797.91 N 5972833.48 N 5972854.09 N 5972874.74 N 5972888.90 N 5972891.32 N 5972884.67 N 700 19' 46.1429" N 700 19' 45.9156" N 700 19' 45.6752" N 700 19' 45.4083" N 700 19' 45.0863" N 700 19' 44.6831" N 700 19' 44.4702" N 700 19' 44.3255" N 700 19' 44.3030" N 700 19' 44.3743" N 700 19' 44.6014" N 700 19' 44.8529" N 70019' 45.1173" N 70019' 45.4110" N :astings (ft) 3169.51 W 3151.61 W 3128.88 W 3107.46 W 704804.41 E 704830.44 E 704847.97 E 704859.97 E 704866.64 E 704863.58 E 704854.57 E 704837.08 E 704814.09 E 704791.84 E 704758.17 E 704736.21 E 704721.87 E 704713.39 E 704711 .88 E 704715.52 E 704724.79 E 704742.30 E 704764.97 E 704786.58 E 148020' 19.5062" W 148020' 18.7644" W 148020'18.2719" W 148020'17.9431" W 148020' 17.7744" W 1480 20' 17.8964" W 148020' 18.1768" W 1480 20' 18.6994" W 148020' 19.3727" W 148020'20.0167" W 148020' 20.9817" W 1480 20' 21 .6027" W 148020'22.0001" W 1480 20' 22.2240" W 1>' ~ BPXA Lisburne PSI (East Dock) Target Target Shape Type ~ .~ DrillQuest 2.00.09.006 North Slope Alaska Target Name PSI-10 TD Geo Circle 29 July, 2002 - 9:17 Sperry-Sun Drilling Services Proposal Report for PSI-1 0 WPS - PSI-10 WP05 Revised: 25 July, 2002 #15 #16 #17 # Page 11 of 11 Target Entry Coord in TVD Northings (ft) (ft}7f 45.7611 ì1ili 1 liJ\i 1 3" N 00 19' 6.2978" N 700 19' 46.3155" N 700 19' 46.2443" N astings (ft) 1480 20' 22.2397" W 148020' 22.1171" W 1480 20' 21.8301" W 1480 20' 21.3078" W 148020'20.6442" W 148020' 20.0188" W 6693.99 N 3109.93 W 5972795.14 N 704786.60 E 70019'45.3641" N 148020'20.0897" W 150.00ft ~ .. BPXA Lisburne PSI (East Dock) Target Target Shape Type ,,_,i Circle Geological ~ DrillQuest 2.00.09.006 See Mn Jne Azi TVD +N/-S +FJ-W DI-"g TI1ace VSec Target I 31.40 om 0.00 31.40 o.m o.m 0.00 0.00 0.00 2 34.00 o.m 0.00 34.<Xi 0.00 0.00 o.m o.m om 3 300.00 om 0.00 300.00 o.m 0.00 o.m 0.00 0.00 4 1864.80 23.47 340.00 1821.40 296.98 .108.1)9 150 340.00 314.87 5 2191.87 23.47 340.00 2121.42 419.38 -152.64 0.00 0.00 444.65 6 2620.08 32.()4 340.00 2500.01 6G\S.60 -220.78 2.00 0.00 643.15 3226.35 52.94 334.46 2944.74 980.26 -381.93 3.50 347.71 1049.92 8 9759.86 52.94 334.46 6882.17 568457 -2629.80 0.00 O.!XI 6263.39 9 1\406.91 20,00 334.66 818851 6556.23 -3045.19 2.(XI 179.87 7228.92 10 1\506.91 20.m 334.66 8282.48 6587.14 -3059.82 0.00 O.lX) 7263.12 1\ 1\851.71 20.00 334.66 8606.49 6693.72 -3110.30 0.00 0.00 7381.05 WH.I,DETAII.5 Name +N!-S +FJ-W NlH1hing l~stillg LatituJc Longitude- SIoI PSIIO 141.60 :J2.1.86 59MI89.89 701!080.81 70" 18'39.532N 148" 18.49.292W N/A ANTI-COLLISION SETI1NGS COMPANY DETAILS BP Amoco )cptl>Fm Depth To SUlYeylPlan !lAO HJOO.IXJ Pklnne<!: PSI. 10 WI~J5 VI 100100 11851.71 Pimned:PSl-]()WP05 VI Interpolation Method:MD Interval: 50,00 Depth Range From: 31.40 To: 11851.71 Maximum Range: 1382.03 Reference: Plan: PSI-IO WP05 Ca1cukitkm Method: Minimum Curvature Error System: ISCWSA Sean Method: Trav Cylinder Norlh EITOT Surface: Elliptical + Casing Warning Method: RuJcs Based =l§è 0 -125 -100 ''''75 ""'''50 ./ / / "".25 -0 fl:':,:"~}:,:,, i 2701~ ~ . ..:"".: I ¡: ~ "-,:: I V i, '",\" i ~ l-\-. \ :! .'!<..," .' K"'. ~.:.:;,. I ~ II, - ,." !,".: ':"ffij. .'.. ~~..." !? ' ' :' "I, "'j ." . ,.::,. I ~r" '-' ,'" it '.'" ,~' .' ,:: ;;; ",' ~~vl",."", :E=:::;: ~ if' "~ ... .' ,1ft' .'" !? .o.},t~~l} ~\~I(~j::::" .f ~' II.Ø:.I~j" ,.. :"~~' / cl,'i,":' :,r ~' . r .~. ~'.:""~'~ <. ','.f",~ .~: ~.~. 2JI t, ~'7>\ 'Ì' - 'Î~\'ð.-¡:' ~'7>\ / -25 -50 -75 -100 , . -125 =B2 Travelling Cylinder Azimuth (TFO+AZI) [deg] vs Centre to Centre Separation [50ft/in] . Sù'RVEY PROGRAM ,I, .. Tool WELLP ATH nET AILS Plan PS/IO CB-GYRO.SS Rig: MWI)¡.lf'R.MS Ref. Datum; V.Section Anglo RKß 51.4 @ (RKß 51.4 ) 51.4Of1 Origfl +N/-S Origin +Ei-W StaI1ing From TVD 335.08° 0.00 From Colour 0 250 500 750 1000 1250 1500 1750 2000 2250 2500 2750 3000 ToMD 250 500 750 1000 1250 1500 1750 2000 2250 2500 2750 3000 12000 LEGEND - PSI 5 (Plall PSI 5), Major Risk - PS( 6 (pSI 6), Majc:1r Risk -- PSI 7 (plan PSI 7). Major Ri~k - PSI 8 (plan PSI g). Major Risk - PSI 9 (P'III PSI 9). Major Ri,k - PSI 9 (Rig: PSI 9), Major Risk PSI-OI (Plan PS/I), Mapr Risk - PSI-OI (Rig PSI-Ol MWD+fFR+MS), Major Risk - L3-0t (1.3-01), Major Risk - Pbn PSI 10 PS(-({)WP05 .-,/ 90 Plan: PSI-IO WP05 (PSIIOIPlan PSI 10) Created By: Peach HOlt7111a11 Dale:07h.~' D¡lle: ---- Date: Checked : Rcvicw~l: Approved: -- Da'e:_- SECTION nET AILS . j/J ') Sperry-Sun Anticollision Report Company: BP Amoco .'ield: Lisburne Reference Site: East Dock (PSI) Reference Well: PSI 10 Reference Wellpath: Plan PSI 10 Date: 07/25/2002 Time: 10:42:07 Page: 1 Co-ordinate(NE) Reference: Vertical (TVD) Reference: GLOBAL SCAN APPLIED: All wellpaths within 200'+ 10011000 of reference Interpolation Method: MD Interval: 25.00 ft Depth Range: 31.40 to 11851.71 ft Ma.~mum Radius: 1382.03 ft Reference: Error Model: Scan Method: Error Surface: Well: PSI 10, True North RKB51.4 @(RKB51.4)51.4 Db: Oracle Principal Plan & PLANNED PROGRAM ISCWSA Ellipse Trav Cylinder North Ellipse + Casing .................-...---.-.---.- -----.....-.......-...-.----.---- Survey Program for Definitive Wellpath Date: 08/30/200 1 Validated: No Version: 8 Planned From To Survey Toolcode Tool Name ft ft 31.40 1001.40 Planned: PSI-10 W P05 V1 CB-GYRO-SS Camera based gyro single shots 1001.40 11819.01 Planned: PSI-10 WP05 V1 MWD MW D - Standard Ca~ing Points MD TVD Diameter Hole Size Name ft ft in in 5947.11 4584.40 13.375 17.500 13 3/8" 11506.83 8282.40 9.625 12.250 95/8" 11819.00 8575.74 7.000 8.500 7" Summary <---------------------- Offset Wellpath ----------------------> Reference Offset Ctr-Ctr No-Go Allowable Site Well Wellpath MD MD Distance Area Deviation Warning ft ft ft ft ft East Dock (PSI) PSI 5 Plan PSI 5 V5 Plan: PS 723.84 725.00 151.61 17.12 134.49 Pass: Major Risk East Dock (PSI) PSI6 PSI6 V14 624.80 625.00 122.06 12.20 109.86 Pass: Major Risk East Dock (PSI) PSI7 Plan PSI 7 V6 Plan: PS 698.89 700.00 91.87 16.64 75.23 Pass: Major Risk East Dock (PSI) PSI 8 Plan PSI 8 V12 Plan: P 674.87 675.00 63.10 16.15 46.95 Pass: Major Risk East Dock (PSI) PSI 9 Plan PSI9 V16 Plan: P 574.58 575.00 31.35 14.25 17.10 Pass: Major Risk East Dock (PSI) PSI 9 Rig: PSI 9 V2 699.12 700.00 32.40 12.83 19.58 Pass: Major Risk East Dock (PSI) PSI-01 Plan PSI 1 V7 Plan: PS 847.32 850.00 271.82 18.62 253.21 Pass: Major Risk East Dock (PSI) PSI-01 Rig PSI-01 MWD+IFR+MS 400.18 400.00 272.78 8.75 264.04 Pass: Major Risk Lis DS 03 L3-0 1 L3-01 V1 Out of range Site: East Dock (PSI) Well: PSI5 Rule Assigned: Major Risk Wellpath: Plan PSI 5 V5 Plan: PSI 5 wp03 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing Distance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 31.40 31 .40 31.40 31.40 0.00 0.00 251.59 251.59 13.375 150.00 1.29 148.72 Pass 50.00 50.00 50.00 50.00 0.08 0.08 251.59 251.59 13.375 150.00 1.96 148.05 Pass 75.00 75.00 75.00 75.00 0.19 0.13 251.59 251.59 13.375 150.00 2.68 147.33 Pass 100.00 100.00 100.00 100.00 0.30 0.16 251.59 251.59 13.375 150.00 3.36 146.64 Pass 125.00 125.00 125.00 125.00 0.37 0.28 251.59 251.59 13.375 150.00 4.18 145.82 Pass 150.00 150.00 150.00 150.00 0.44 0.37 251.59 251.59 13.375 150.00 4.90 145.10 Pass 175.00 175.00 175.00 175.00 0.51 0.44 251.59 251.59 13.375 150.00 5.56 144.44 Pass 200.00 200.00 200.00 200.00 0.58 0.50 251.59 251.59 13.375 150.00 6.20 143.81 Pass 225.00 225.00 225.00 225.00 0.63 0.56 251.59 251.59 13.375 150.00 6.79 143.21 Pass 250.00 250.00 250.00 250.00 0.68 0.62 251.59 251.59 13.375 150.00 7.37 142.64 Pass 275.00 275.00 275.00 275.00 0.73 0.67 251.59 251.59 13.375 150.00 7.93 142.08 Pass 300.00 300.00 300.00 300.00 0.78 0.72 251.59 251.59 13.375 150.00 8.48 141.53 Pass 325.03 325.03 325.00 325.00 0.83 0.77 251.55 271.55 13.375 150.00 9.02 140.98 Pass 350.05 350.05 350.00 350.00 0.87 0.82 251.46 271.46 13.375 149.99 9.55 140.44 Pass 375.07 375.07 375.00 375.00 0.92 0.86 251.30 271.30 13.375 149.98 10.07 139.91 Pass 400.09 400.07 400.00 400.00 0.96 0.91 251.09 271.09 13.375 149.97 10.59 139.38 Pass 425.09 425.07 425.00 425.00 1.01 0.96 250.80 270.80 13.375 149.96 11.11 138.85 Pass 450.09 450.05 450.00 450.00 1.05 1.00 250.46 270.46 13.375 149.95 11.62 138.33 Pass 475.07 475.01 475.00 475.00 1.09 1.04 250.05 270.05 13.375 149.95 12.13 137.81 Pass 500.03 499.94 500.00 500.00 1.14 1.08 249.58 269.58 13.375 149.95 12.64 137.31 Pass 524.98 524.85 525.00 525.00 1.18 1.13 249.05 269.05 13.375 149.97 13.15 136.82 Pass --..------------- ------'------ .':'" JfI ') Sperry-Sun Anticollision Report ) ç~mpIÚlY: Field: Ref~renceSite: RefèrenceWeD: R.~fëi~nce.WëU'p dh: BP AmOco lisburnè East Dopk{PSI) PSIJO ' PlanPS'.10 D~te;. ..07/29/2002 Tilne: ......12:42:19 NO GLOBAL SCAN: Using user defmed selection & scan criteria Interpolation Method: MD Interval: 50.00 ft Depth Range: 31.40 to 11851.71 ft Maximum Radius: 1382.03 ft Reference: Error Model: Scan Method: Error Surface: yvell:pSIJP,rrÜe t-Jortn RKB5L4@(RKB 5104)51 A . Dh: Plan: PSI-10 WP05 & NOT PLANNED PROGRA ISCWSA Ellipse Trav Cylinder North Ellipse + Casing Co-ordina~e(NE)Referenc~: Vettic~ (TVI>J Referelice: Casing Points DiäJneter in 5947.09 4584.40 11506.82 8282.40 11819.00 8575.75 13.375 9.62!;> 7.000 17.500 12.250 8.500 13 3/8" 95/8" 7" Plan: PSI-10WP05 Date Composed: Version: Tied-to: 07/24/2002 1 From Well Ref. Point Principal: Yes Summary Reference offset Ctr~Ctr No~GO AUowable MD MD Dištan(:e.. Area Ðcviation ft ft ft ft ft East Dock (PSI) PSI5 Plan PSI 5 V5 Plan: PS 748.61 750.00 152. 15 17.62 134.53 Pass: Major Risk East Dock (PSI) PSI6 PSI6 V14 599.87 600.00 121.61 11.74 109.88 Pass: Major Risk East Dock (PSI) PSI7 Plan PSI 7 V6 Plan: PS 698.89 700.00 91.87 16.64 75.23 Pass: Major Risk East Dock (PSI) PSI8 Plan PSI 8 V12 Plan: P 699.83 700.00 63.62 16.66 46.96 Pass: Major Risk East Dock (PSI) PSI9 Plan PSI 9 V16 Plan: P 549.69 550.00 30.89 13.78 17.11 Pass: Major Risk East Dock (PSI) PSI9 Rig: PSI 9 V2 699.12 700.00 32.40 12.83 19.58 Pass: Major Risk East Dock (PSI) PSI-01 Plan PSI1 V7 Plan: PS 847.32 850.00 271.82 18.62 253.21 Pass: Major Risk East Dock (PSI) PSI-01 Rig PSI-01 MWD+IFR+MS 400.18 400.00 272.78 8.75 264.04 Pass: Major Risk EX EBAYST-01 EBAYST-01 EBAYST-01 V4 597.42 600.00 355.87 14.70 341.17 Pass: Major Risk Lis DS 03 L3-01 L3-01 V1 Out of range Site: East Dock (PSI) Well: PSI5 Rule Assigned: Major Risk Wellpath: Plan PSI 5 V5 Plan: PSI 5 wp03 V1 Inter-Site Error: 0.00 ft Reference Offset SeÏni-Major AxiS Cti-Ctr No~GO AUowable MD TVD MD TVD Ref Offset TFO+i\ZITFP'HS ..Casing Distance ..Area Deviätion ft ft ft ft ft ft, deg deg in ft ft ft 31.40 31.40 31.40 31.40 0.00 0.00 251.59 251.59 13.375 150.00 1.29 148.72 Pass SO.OO 50.00 50.00 50.00 0.08 0.08 251.59 251.59 13.375 150.00 1.96 148.05 Pass 100.00 100.00 100.00 100.00 0.30 0.16 251.59 251.59 13.375 150.00 3.36 146.64 Pass 150.00 150.00 150.00 150.00 0.44 0.37 251.59 251.59 13.375 150.00 4.90 145.10 Pass 200.00 200.00 200.00 200.00 0.58 0.50 251.59 251.59 13.375 150.00 6.20 143.81 Pass 250.00 250.00 250.00 250.00 0.68 0.62 251.59 251.59 13.375 150.00 7.37 142.64 Pass 300.00 300.00 300.00 300.00 0.78 0.72 251.59 251.59 13.375 150.00 8.48 141.53 Pass 350.05 350.05 350.00 350.00 0.87 0.82 251.46 271.46 13.375 149.99 9.55 140.44 Pass 400.09 400.07 400.00 400.00 0.96 0.91 251.09 271.09 13.375 149.97 10.59 139.38 Pass 450.09 450.05 450.00 450.00 1.05 1.00 250.46 270.46 13.375 149.95 11.62 138.33 Pass 500.03 499.94 500.00 500.00 1.14 1.08 249.58 269.58 13.375 149.95 12.64 137.31 Pass 549.91 549.74 550.00 550.00 1.22 1.17 248.46 268.46 13.375 150.00 13.66 136.34 Pass 599.71 599.40 600.00 600.00 1.31 1.25 247.09 267.09 13.375 150.14 14.66 135.48 Pass 649.42 648.93 650.00 650.00 1.40 1.33 245.55 265.55 13.375 150.49 15.64 134.84 Pass 699.05 698.33 700.00 700.00 1.49 1.39 243.93 263.93 13.375 151.15 16.62 134.53 Pass 748.61 747.58 750.00 749.98 1.59 1.47 242.24 262.24 13.375 152.15 17.62 134.53 Pass 798.07 796.66 800.00 799.96 1.69 1.53 240.49 260.49 13.375 153.50 18.62 134.88 Pass 847.45 845.58 850.00 849.92 1.80 1.61 238.70 258.70 13.375 155.22 19.67 135.56 Pass 896.73 894.30 900.00 899.86 1.91 1.68 236.87 256.87 13.375 157.32 20.71 136.63 Pass 945.91 942.84 950.00 949.78 1.97 1.75 235.03 255.03 13.375 159.82 21.61 138.24 Pass 994.99 991.16 1000.00 999.68 2.03 1.83 233.18 253.18 13.375 162.73 22.49 140.28 Pass 1043.97 1039.28 1050.00 1049.53 2.04 1.86 231.41 251.41 13.375 166.07 23.12 143.01 Pass 1092.89 1087.21 1100.00 1099.30 2.05 1.90 229.80 249.80 13.375 169.85 23.73 146.20 Pass 1141.74 1134.94 1150.00 1148.98 2.06 1.91 228.35 248.35 13.375 174.05 24.29 149.85 Pass '¥ ~~r-28-2002 07:22 ) ;/ . /,~«:~~:.;':....: PRUDHOE BAY.. >:./.,/ ..,.,....,.....:::~'~'",...,." ~ b ('\¡ c ëi (j .,' T-768 P.002/002 F-834 ) R U [HJ 0 Ii BAY EAST ~;,h /"..,.,.. ',.." ...., ,...".~ ..- -- EASì"Põëî<. - ,.:7; . " I --£{)f. ,":' ,.Q W ~ PROJECT ' ~:~ ¡ , r " '¡:p PI)D ~ ':''-'I:'~ '.'~ / AAEAA'" 'ŠT'QRG.f<\j"'.', /' \ Sf PtO ' .~. .' . ~ :.; , /'. .", ~.. 1. ~~ ,¿'\ 't \ ' '; . ..'~,~ 'i "l~~ . '--:"::::~~ ';':;.. \ ",.r.:~' }; " . ~a::~I;:'\("'-~:' -;-. ,;.~ . :~,~1~:~:'~~~:~!;:~\:;? . ~~,y~ (SOUT~ BAY ~~j~. , )¡' \~~ From-MCC WING 6 +907-659-5065 a .' z < ~~ .,.~- I .0" ..-." VICINITY MAP N.T.S, (.!) ;;2: F c,I) X u..J I Vi CL -+- IJ") <.0 " ex) 01 0 1 I I I I I ü1 û) U1 (/) (7) fJJ CL 0.. 0... a.. CL Q.. -+--+--+--+--+--+- -I ...J ~ . EAST DOCK WEST PAD ..' ,....../"'" " ,...." ...,...,..,... " . .LEGEND -+- AS-STAKED CONOUCTOR . EXISTtNG CONDUCTOR ~ ~ -t ~ '/ ¡::---. ~ ~~., /O~ ISSUED fO~ J~i'O~IoAA 11 ON ::: N~ {\..1f LOCATED WITHIN PROTRACTED- SEC. 15, T: 11 N" R. 1 ~- E.. UMtA T MERIDIAN, ALA~t<A WE:tL A.S.P. _. PLANT' GEODE1'¡C GEÖDETIC APPROX. SECrlON NO. COORDINATES 4COORDINA TES POSITION(DMS) POSITI?N(D.DD) GND: ELEV. OFFSE}"S Y=5,966,.097,55 N;:::10.000.00 70.18'38.693" 70.3107481. 3,800' FSL PSI-1 X;::: 707,827.10 E= 4,910.00 148"18'56.76~" 148.315?6~1' 17.6'.. ..4..579' FEL y= 5,966.138.59 N='\O,OOO.OO 70.18'39.066" 70.310851 T ~,8:S8' FSL PSI-5 x= 707.939.86 E= 5.030.00 - 148'18'5;3,444" 148.3148456" 17,5' 4,465' FEL PS 6 Y= 5.966,148.85 N=10,OOO.00 70.18'39,159" 70.3108775' 17 5' 3.848' FSL t- X~=:; 707.968..°5 E~ 5,060.00 148'18'52.613". .14B.314614T. . 1J4;36' FEL y= 5,966,' 59.11 N=10.000.00 70"18'39.253" 70..3109036. 3,857' FSL PSI-7 x= 707,996.~4 E= 51.990.00 148J8'51.783~..- 148.3143842" 17.4' ¿.,408' fEL .Y~5,966,169.~7 .N=10,OOO.00 70"18'39.346" 70.3109294. 3,867' FSL P$I-8 x= 708,024.43 E= 5.120.00 148~'8'=!O.953" 1 ~S.3141536" ". ' 7.4' 4,;5?9' FEL PS 9 y= 5,966,179.63 N;;;10,OOO,OO 70'18'39,439" 70.3109553. 17 3' 3,876' FSl. 1- x= 7.°8.052.62 ,E= 5.150.00 148"8:5.0.123" '4~,3'39231. . 4,3!?1' FEL y= 5,966,189,89 N=10,OOO.OO 70'18'39.532" 70.3109811* 17.4' 3.886' FSL PS!-'O x= 708.080.81 E~. 5,180.00 148"18'49,292" 148.31~~9Z2" 4.322' FE.L F. ~Óbel\. . (JRAM-I' JACOBS O. 1- --r- . CI11:CKEb: ~SOro.!..~ bp 1 ]-' . ~ ::~~,"ê//27/02. -. - ~ FR802 EO 01-00 T ~~~j~ :: 'f:-$~:~EODgg~D~TC~:~ '111,"(" 'M'''''.-';;;;:-- 1"m .00' WELLS PSt-l, 5, 6. 7. 8, 9 & 10 ~~ ""',f¡¡~ ~IU . !;Mcn: "., Q ,::. rL, ;g ~ rL, ;;, ã ~ b ~ CJ .. a 1:; ù ':;: ... L.J Q Q o. L.J ~ f ~ :::: f~ ~ .:t 15 ç¡ 1 OF 1 .. FcEVlSlCN J.J RFI'. .. OY CHK DATE CHECK NO. H 207005 7/12/02 VENDOR H20700S DATE GROSS DISCOUNT NET INVOICE I CREDIT MEMO DESCRIPTION 7/12/02 INV# CK071002E PERMIT TO DRILL FEE RECEIVED H II "\ 1 ?f{¡? \.,,)V~- v , ...,\ ",,-, AJaslca 011 & Gas Cons. LomnHssion t\m~hora~Je ?SI-}o THE ATIACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. TOTAL ... PAY COMMISSION 333 W 7TH ANCHORAGE, AI<. ~~;::~~'~~~~:~~.~:f::~~.:~~.~~~~.~::::~.;~.:::i:\\~.:~ .:.:..:.:~:.. ...r.'.."í:..-~:''''''::',,,,~:,,,,, -:-.",-:. "...'...,-.... ..e.- .". '...,'. ¡~!::~;:.: :;~.::\ .. A::\¡;A¡ :;;:{:i:~::::;Ù:i:7:1 III 2 0 ? 0 0 5 III I: 0... ~ 2 0 :I a q 5 I: 0 0 B ... ... ~ q III H ~' ~., 1. TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTERlP ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME /ð>é1 ,!/SI-/o PTD# 202- -/.çr CHECK WHAT APPLIES ADD-ONS (OPTIONS) MULTI LATERAL (If API number last two (2) digits are between 60-69) PILOT (PH) HOLE SPACING EXCEPTION DRY DITCH SAMPLE Rev: 07/10/02 C\j ody\templates "CLUE" The permit is for a new wellbore segment of existing well Permit No, API No. Production should continue to be reported as a function. of the original API number stated above. In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 70/80) from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. ,WELL PERMIT CHECKLIST COMPANY ß/J)( WELL NAME hú /5/~)0 PROGRAM: Exp - Dev - Redrll - Re-Enter - Serv ~ Wellbore seg - FIELD & POOL h 7'~.;: ç- /1' INIT CLASS 1-,. .v/f GEOL AREA? ., n UNIT# // C- (0 ON/OFF SHORE ~.v ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . ~ N 2. Lease number appropriate. . . . . . . . . . . . . . . . . . . Y N 3. Unique welt name and number. . . . . . . . . . . . . . . . . Y N 4. Well located in a defined pool.. . . . . . . . . . . . . . . . . Y N 5. Well located proper distance from drilling unit boundary. . . . Y N 6. Well located proper distance from other wells.. . . . . . . . . Y N 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . Y N 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . Y N 9. Operator only affected party.. . . . . . . . . . . . . . . . . . Y N 10. Operator has appropriate bond in force. . . . . . . . . . . . . Y N 11. Permit can be issued without conservation order. . . . . . . . Y N 12. Permit can be issued without administrative approval.. . . . . Y N (Service Well Only) 1.3. Well locate.d w/in area & strata àuthorized by injection order #$- \.Ÿi ,N (Service Well Only) 14. All wells wlin ~ mile area of review identified. . . . . . . . .. WN ENGINEERING 15. Conductor string provided. . . . . . . . . . . . . . . . . . . ~~ N 16. Surface casing protects all known USDWs. . . . . . . . . . . N 17. CMT vol adequate to circulate on conductor & surf csg. . . . . .. N- 18. CMT vol adequate to tie-in long string to surf csg. . . . . . . . ~ ~~: g~s~n~i~~~i~~Sa~~~~ou:~eP:~rd~~~~~ h~~:~~~fr~~t.' : : : : : : ~ ~ . f 21. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . 4?N tJtt.t>PrS ¿ 7 E 22. If a re-drill, has a 10-403 for abandonment been approved. . . Y N ,." IA;- 23. Adequate wellbore separation proposed.. . . . . . . . . . . . iN 24. If diverter required, does it meet regulations. . . . . . . . . . . N 25. Drilling fluid program schematic & equip list adequate. . . . . N fJ1~ /Ill {¡.j / (). ~ ppc¡. 26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . . N .A.. P 4 27.. BOPE press ratingappropriate;.testto '/000 psig. ~N 'v~~ ]O~ fSl. 28. Choke manifold complies w/API RP-53 (May 84). . . . . . . . N 29. Work will occur without operation shutdown. . . . . . . . . . . . N 30. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . Y llP 31. Mechanical condition of wells within AOR verified. . . . . . . . Y N I ~ 7 - 1 ~ 7) I i ~ - 0' ~ 32. Permit can be issued w/o hydrogen sulfide measures. . . . . éfj N 33. Data presented on potential overpressure zones. . . . . . . . ;rY: N~---- /. ¿ i, ./1.1 34. Seismic analysis of shallow gas zones. . . . . . . . . . . . . /Vj itl 35. Seabed condition survey (if off-shore). . . . . . . . . . . . . . 36. Contact name/phone for weekly progress reports. . . . . . . . GEOLOGY: PETROLEUM ENGINEERING: RESERVOIR ENGINEERING UIC ENGINEER RP~ TEM JDH ~ JBR 'APPR DATE ~~2- APPR DATE VJ&\- .g/,(o~ (Service Well Only) GEOLOGY APPR DATE /k ~h? (Exploratory Only) Rev: 07/12/02 SFD- WGA \;JGA- MJW G:\geology\perm its\checklist.doc Ll~F w;.t-j ~ ph7d /JI~ft/~. Ckf ~ k~fæv> oK. Ì-q £ ~ o'f ~ j -7 (Jh7d. ~t ~ fL-<~/fùC OK. ). COMMISSIONER: COT DTS O~{ 0 7/rÞ ~ Comments/Instructions: ) ) Well History File APPENDIX Infonnation of detailed nature that is not particularly gennane to the Well Pennitting Process but is part of the history file. To improve the readability of the Well History file and to simplrfy finding infonnation, infonnation of this nature is accumulated at the end of the file under APPEN.DIX. No special. effort has been made to chronologically organize this category of infonnation. .' Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Wed Mar 19 13:54:12 2003 Reel Header Service name.............LISTPE Date. . . . . . . . . . . . . . . . . . . . .03/03/19 Origin. . . . . . . . . . .. . . . . . . . STS Reel Name - . - . . . . - - . . . . - - . UNKNOWN Continuation Number......01 Previous Reel Name.......UNKNOWN Comments.................STS LIS Tape Header Service name.............LISTPE Date.....................03/03/19 Origin...................STS Tape Name................UNKNOWN Continuation Number......Ol Previous Tape Name.......UNKNOWN Comments. . . . . . . . . . . . . . . . . STS LIS Physical EOF Comment Record TAPE HEADER Prudhoe Bay Unit MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 AKMW22135 T. GALVIN D. FERGUSON JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 4 AK!vlW22135 P. ROGER D. FERGUSON # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: # WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE BIT SIZE (IN) 16.000 12.250 8.500 # REMARKS: " Writing Library. Scientific Technical Services Writing Library. Scientific Technical Services PSI-10 500292311000 BP Exploration Sperry Sun 19-Jv1AR-03 (Alaska) Inc. MWD RUN 2 AKMW22135 T. GALVIN D. FERGUSON MWD RUN 3 AKMW22135 P. SMITH D. FERGUSON MWD RUN 5 AKMW22135 P. ROGER W. DECKER 15 11N 15E 1394 957 .00 50.45 17.20 CASING SIZE (IN) 20.000 13.375 9.625 DRILLERS DEPTH (FT) 111. 0 6067.0 11434.0 ~œ-J59 11~1Lj ) ./ 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. Ì"IWD RUNS 1-2 COHPRISED DIRECTIONAL AND DUAL GAMJVIA RAY (DGR), UTILIZING GEIGER-MUELLER TUBE DETECTORS. 4. MWD RUNS 3-4 COMPRISED DIRECTIONAL WITH DGR; ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4); AND PRESSURE WHILE DRILLING (PWD). 5. MWD RUN 5 COMPRISED DIRECTIONAL WITH DGR; EWR4; COMPENSATED NEUTRON POROSITY (CNP); AND STABILIZED LITHO-DENSITY (SLD). 6. LOG AND MERGED DIGITAL DATA (LDWG) ONLY WERE SHIFTED TO A SCHLUMBERGER CASED-HOLE GAMMA RAY LOG RUN IN PSI-I0 ON 28 AUGUST 2002. LOG HEADER DATA RETAIN ORIGINAL DEPTH REFERENCES. THESE PDC LOG DATA WERE PROVIDED BY DEWAYNE SCHNORR ON 12 NOVEMBER 2002. 7. MWD RUNS 1 - 5 REPRESENT WELL PS1-10 WITH API#: 50-029-23110-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 11809'MD I 8594'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLO\~ SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME. SPSF = SMOOTHED NEUTRON POROSITY (SANDSTONE MATRIX, FIXED HOLE SIZE)- SNFA = SMOOTHED AVERl.l,.GE OF FAR DETECTOR'S COUNT RATE. SNNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE. SBD2 = SMOOTHED BULK DENSITY-COMPENSATED (LOW-COUNT BIN). SC02 = SMOOTHED STANDOFF CORRECTION (LOW-COUNT BIN). SNP2 = SMOOTHED NEAR DETECTOR ONLY PHOTOELECTRIC ABSORPTION FACTOR (LOW-COUNT BIN). SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. PARAMETERS USED IN POROSITY LOG PROCESSING: HOLE SIZE: 8.50" MUD WEIGHT: 9.0 PPG MUD SALINITY: 15,500 PPM CHLORIDES FORMATION WATER SALINITY: 50,000 PPM CHLORIDES FLUID DENSITY: 1.0 GICC MATRIX DENSITY: 2.65 GICC LITHOLOGY: SANDSTONE $ File Header Service name.............STSLIB.OOl Service Sub Level Name... Version Number...........1. 0.0 Date of Generation.......03/03/19 Maximum Physical Record..65535 File Type................ LO Previous File Name.......STSLIB.OOO Comment Record FILE HEll"DER FILE NUMBER: EDITED MERGED MWD Depth shifted and DEPTH INCREMENT: # FILE SUMM.1\RY 1 clipped curves; all bit runs merged. .5000 PBU TOOL CODE GR ROP FET RPX RPS RPM RPD PEF NPHI FCNT NCNT DRHO RHOB $ ) START DEPTH 112.0 112.0 5964.0 5964.0 5964.0 5964.0 5964.0 11202.0 11203.0 11203.0 11203.0 11426.0 11426.0 ) STOP DEPTH 11771.5 11807.5 11764.5 11764.5 11764.5 11764.5 11764.5 11740.0 11731.5 11732.0 11 732.0 11740.0 11740.0 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE 112.0 10962.0 10963.5 10966.5 10968.0 10973.0 10982.0 10984.0 10988.5 10991.5 10995.5 10997.0 10999.5 11003.5 11007.5 11011.0 11014. 0 11015.5 11017.0 11020.5 11024.0 11028.0 11032.0 11035.0 11038.0 11040.0 11043.0 11045.0 11046.5 11048.5 11055.0 11057.5 11062.5 11065.0 11068.0 11 070.0 11074.5 11082.5 11084.5 11085.5 11087.0 11090.0 11092.0 11093.5 11098.0 11101.5 11103.5 11108.5 11115.0 11116.5 11119.5 11124.5 11128.0 11130.5 11135.5 DEPTH GR 111. 5 10961.5 10963.5 10965.0 10966.0 10973.0 10982.0 10983.0 10988.0 10992.0 10995.0 10997.0 10998.5 11004.0 11006.5 11008.5 11011.5 11015.5 11016.5 11020.5 11024.0 11028.0 11031. 0 11033.5 11037.0 11039.0 11042.0 11044.5 11045.5 11048.0 11053.5 11057.0 11061. 0 11064.0 11066.5 11068.5 11073.0 11080.0 11083.5 11085.0 11087.5 11090.5 11092.5 11095.0 11097.5 11101.0 11103.0 11106.5 11114.5 11116.5 11118.5 11124.5 11126.0 11128.5 11134.5 ) ) 11139.5 11143.5 11152.5 11154.5 11156.5 11158.5 11160.0 11162.0 11164.0 11165.0 11166.5 11171.5 11174.0 11175.5 11180.5 11185.5 11188.0 11191. 0 11193.0 11194.5 11196.0 11199.5 11200.5 11202.0 11203.0 11205.0 11205.5 11208.0 11210.5 11213.5 11216.5 11218.0 11220.5 11224.0 11229.5 11232.0 11237.5 11239.5 11240.5 11247.5 11248.5 11255.0 11265.0 11266.5 11268.5 11271. 0 11274.5 11277.0 11279.5 11282.0 11283.5 11285.5 11289.5 11292.5 11295.5 11297.0 11299.5 11301.0 11303.0 11306.0 11308.5 11310.0 11311.0 11312.0 11313.5 11315.0 11323.0 11325.5 11329.5 11333.0 11336.0 11343.0 11348.0 11350.5 11354.0 11137.5 11142.0 11149.5 11151.0 11154.0 11157.0 11158.5 11159.5 11160.5 11162.5 11165.0 11170.0 11173.0 11175.0 11176.5 11182.0 11187.0 11189.5 11191. 5 11192.5 11193.5 11198.5 11200.0 11201.0 11204.0 11205.5 11207.0 11208.0 11210.5 11212.0 11215.0 11216.0 11218.0 11221.5 11227.5 11230.0 11233.0 11234.5 11236.0 11244.5 11247.0 11253.0 11260.5 11262.0 11266.5 11269.0 11272.5 11275.0 11278.0 11280.0 11281.0 11285.0 11288.0 11292.0 11294.0 11295.0 11298.0 11300.0 11302.0 11305.0 11307.5 11309.5 11311.5 11313.0 11315.0 11316.5 11320.0 11322.5 11327.0 11330.0 11333.5 11340.0 11346.5 11348.0 11350.5 11358.0 11359.5 11360.5 11363.0 11365.5 11367.5 11373.5 11376.0 11379.0 11381.0 11384.0 11385.5 11389.0 11393.0 11395.0 11396.5 11398.5 11404.0 11410.5 11412.5 11416.5 11420.5 11424.0 11426.0 11435.0 11445.5 11449.0 11452.0 11454.5 11456.5 11462.5 11464.5 11467.5 11471.0 11473.0 11475.0 11477 . 5 11479.5 11483.0 11490.0 11491.5 11495.5 11498.5 11500.5 11505.5 11525.0 11526.5 11528.0 11529.5 11531. 5 11545.5 11549.5 11551.0 11553.5 11556.0 11560.0 11561.5 11562.5 11565.5 11569.5 11583.0 11587.5 11589.0 11593.5 11596.5 11599.0 11601.5 11603.0 11604.5 11608.0 11614.0 11616.0 11617.5 11621.0 11624.5 ) ) 11353.5 11355.0 11357.0 11361. 0 11364.0 11366.0 11371. 5 11374.0 11376.5 11379.5 11382.0 11384.5 11387.0 11391.5 11393.5 11394.5 11398.0 11402.0 11407.0 11412.5 11417.5 11423.0 11426.0 11428.0 11437.5 11448.5 11452.0 11454.5 11456.0 11458.5 11464.5 11467.0 11469.5 11474.0 11475.0 11477.0 11479.5 11482.0 11484.5 11491. 5 11493.5 11497.5 11500.5 11503.0 11507.5 11527.5 11529.0 11530.0 11531. 5 11533.5 11547.5 11551. 0 11552.5 11556.0 11559.0 11562.5 11564.0 11565.0 11568.0 11572.0 11585.5 11590.0 11592.0 11596.5 11599.0 11601.0 11604.5 11608.5 11609.5 11610.5 11613.0 11615.0 11616.5 11620.5 11623.5 ') 11625.5 11633.0 11642.0 11646.0 11648.0 11649.0 11650.5 11654.0 11656.5 11660.5 11667.5 11670.0 11674.0 11674.5 11678.0 11682.0 11683.0 11684.0 11686.5 11696.0 11697.5 11704.5 11712.5 11715.0 11717.0 11723.0 11725.5 11730.5 11731. 5 11736.0 11737.0 11739.0 11742.0 11745.5 11755.0 11 7 62.5 11763.5 11767.0 11808.5 $ 11625.0 11632.5 11641.5 11645.5 11647.5 11649.0 11650.5 11653.5 11656.0 11660.0 11666.5 11670.0 11673.5 11674.5 11678.5 11681.5 11683.0 11684.5 11686.5 11696.0 11698.0 11 705.5 11714.0 11715.5 11718.5 11723.0 11726.5 11731.0 11 7 32.0 11736.5 11738.0 11739.5 11743.5 11746.0 11756.0 11761.0 11763.0 11 767 . 5 11809.0 # MERGED PBU MWD MWD MWD MWD MWD $ DATA SOURCE TOOL CODE BIT RUN NO 1 2 3 4 5 MERGE TOP 80.5 865.5 5963.5 9920.5 11200.5 MERGE BASE 916.5 6077.0 9973.0 11442.0 11808.0 # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type.................. 0 Data Specification Block Type.....O Logging Direction.................Down Optical log depth units........ ...Feet Data Reference Point..............Undefined Frame Spacing.....................60 .1IN Max frames per record.............Undefined Absent value...................... -999 Depth Units....................... Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHM1v! 4 1 68 16 5 RPM MYIilD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 NPHI MWD PU-S 4 1 68 32 9 ) FCNT MWD CNTS 4 1 68 36 10 NCNT MWD CNTS 4 1 68 40 11 RHOB MWD G/CM 4 1 68 44 12 DRHO MWD G/CM 4 1 68 48 13 PEF MWD BARN 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 112 11807..5 5959.75 23392 112 11807.5 ROP MWD FT/H 0.59 777.1 197.911 23392 112 11807.5 GR MWD API 15.02 343.95 69.5867 23320 112 11771.5 RPX ~'ÌfD OHMM 0.21 976.7 4.05746 11602 5964 11764.5 RPS MWD OHMM 0.22 1035.81 4.83091 11602 5964 11764.5 RPM MíND OHMM 0.34 1046.92 5.79344 11602 5964 11764.5 RPD MWD OHMM 0.77 2000 13.6012 11602 5964 11764.5 FET MWD HOUR 0.11 80.39 3.31083 11602 5964 11764.5 NPHI MWD PU-S 12.2 81. 63 44.2381 1058 11203 11731. 5 FCNT MWD CNTS 405 1240 667.666 1059 11203 11 7 32 NCNT MWD CNTS 2202 3937 2792.23 1059 11203 11732 RHOB MWD G/CM 1.941 2.99 2.34773 629 11426 11740 DRHO MWD G/CM -0.121 0.707 0.0534849 629 11426 11740 PEF MWD BARN 1. 02 15.12 6.4957 1077 11202 11740 First Reading For Entire File..........112 Last Reading For Entire File...........11807.5 File Trailer Service name.............STSLIB.001 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......03/03/19 Maximum Physical Record..65535 File Type................ LO Next File Name...........STSLIB.002 Physical EOF File Header Service name.............STSLIB.002 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......03/03/19 Maximum Physical Record..65535 Fi Ie Type................ LO Previous File Name.......STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 2 header data for each bit run in separate files. 1 .5000 START DEPTH 80.5 111. 5 STOP DEPTH 865.0 916.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TO DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): 11-AUG-02 Insite 66.37 Memory 917.0 112.0 917.0 ) BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units...........Feet Data Reference Point..............Undefined Frame Spacing..................... 60 .1IN Max frames per record.............Undefined Absent value.. ......, .......... .. .-999 Depth Units........ .. .. .. . . . . .. . . . Datum Specification Block sub-type...O .0 3.8 TOOL NUMBER 142827 16.000 .0 SPUD MUD 8.80 300.0 9.2 400 15.2 .000 .000 .000 .000 Name Service Order Units Size Nsam Rep Code Offset Channel DE PT FT 4 1 68 0 1 ROP MWD010 FT/H 4 1 68 4 2 GR MWD010 API 4 1 68 8 3 ') .0 66.0 .0 .0 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 80.5 916.5 498.5 1673 80.5 916.5 ROP MWD010 FT/H 2.04 492.56 175.17 1611 111. 5 916.5 GR MWD010 API 16.96 70.87 34.59 1570 80.5 865 First Reading For Entire File..........80.5 Last Reading For Entire File...........916.5 File Trailer Service name.............STSLIB.OO2 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......03/03/19 Maximum Physical Record..65535 Fil e Type................ LO Next File Name...........STSLIB.003 Physical EOF File Header Service name.............STSLIB.003 Service Sub Level Name... Version Number-......... .1.0.0 Date of Generation.......03/03/19 Maximum Physical Record..65535 Fi 1 e Type................ LO Previous File Name.......STSLIB.002 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 3 ) header data for each bit run in separate files. 2 .5000 START DEPTH 865.5 917.0 STOP DEPTH 6025.5 6077.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ 15-AUG-02 Insite 66.37 Memory 6077.0 917.0 6077.0 7.2 54.7 TOOL NUMBER 142827 16.000 .0 SPUD MUD 8.90 137.0 8.6 1400 8.2 .000 .000 .000 .000 .0 111.0 .0 .0 ) # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction.................Down Optical log depth units...........Feet Data Reference Point..............Undefined Frame Spacing..................... 60 .1IN Max frames per record.............Undefined Absent value..................... .-999 Depth Units....................... Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DE PT FT 4 1 68 0 1 ROP MWD020 FT /H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 865.5 6077 3471.25 10424 865.5 6077 ROP MWD020 FT/H 1.28 637.14 228.157 10321 917 6077 GR MWD020 API 15.02 109.53 55.4916 10321 865.5 6025.5 First Reading For Entire File..........865.5 Last Reading For Entire File...........6077 File Trailer Service name.............STSLIB.003 Service Sub Level Name... Version Number........... 1. 0.0 Date of Generation.......03/03/19 Maximum Physical Record..65535 Fi 1 e Type................ LO Next File Name...........STSLIB.004 Physical EOF File Header Service name.............STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation.......03/03/19 Maximum Physical Record..65535 File Type......... ...... .LO Previous File Name.......STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPS FET RPD RPX RPM GR ROP $ 4 header data for each bit run in separate files. 3 .5000 START DEPTH 5963.5 5963.5 5963.5 5963.5 5963.5 5971.5 6077.5 STOP DEPTH 9920.0 9920.0 9920.0 9920.0 9920.0 9928.0 9973.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE 21-AUG-02 ') SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMJvIA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) }\T TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type.................. 0 Data Specification Block Type.....O Logging Direction.................Down Optical log depth units...........Feet Data Reference Point..............Undefined Frame Spacing.....................60 .1IN Max frames per record.............Undefined Absent value..................... .-999 Depth Units.............. . . . . . . . . . Datum Specification Block sub-type...O ) Insite 66.37 Memory 9973.0 6077.0 9973.0 49.9 55.0 TOOL NUMBER 66093 81797 12.250 6067.0 LSND 9.55 44.0 8.5 1400 4.4 2.200 1. 230 2.200 2.400 70.0 131. 0 70.0 70.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 RPX MWD030 OHMM 4 1 68 12 4 RPS MWD030 OHMM 4 1 68 16 5 RPM MWD030 OHMM 4 1 68 20 6 RPD MWD030 OHMM 4 1 68 24 7 FET MWD030 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 5963.5 9973 7968.25 8020 5963.5 9973 ROP MWD030 FT/H 0.89 777.1 196.873 7792 6077.5 9973 GR MWD030 API 19.11 134.4 68.4448 7914 5971. 5 9928 RPX MWD030 OHMM 0.91 503.67 3.19726 7914 5963.5 9920 ) RPS MWD030 OHMM RPM MWD030 OHMM RPD MWD030 OHMM FET MWD030 HOUR 0.85 0.78 0.82 0.11 297.82 532.93 1691.58 80.39 3.29925 7914 3.68391 7914 6.31123 7914 3.12033 7914 5963.5 5963.5 5963.5 5963.5 9920 9920 9920 9920 First Reading For Entire File..........5963.5 Last Reading For Entire File...........9973 File Trailer Service name.............STSLIB.004 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......03/03/19 Maximum Physical Record..65535 Fi 1 e Type................ LO Next File Name...........STSLIB.005 Physical EOF File Header Service name...-.........STSLIB.005 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......03/03/19 Maximum Physical Record..65535 File Type. .... .. . . . . . . . . . LO Previous File Name.......STSLIB.004 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE FET RPD RPM RPS RPX GR ROP $ 5 header data for each bit run in separate files. 4 .5000 START DEPTH 9920.5 9920.5 9920.5 9920.5 9920.5 9928.5 9973.5 STOP DEPTH 11389.0 11389.0 11389.0 11389.0 11389.0 11396.5 11442.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 23-AUG-02 Insite 66.37 Memory 11442.0 9973.0 11442.0 18.7 46.1 # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 TOOL NUMBER 66093 81797 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): 12.250 6067.0 # ) ') BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OH~!) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: LSND 10.60 48.0 9.3 1500 3.0 2.200 1.150 1.850 2.900 70.0 140.0 70.0 70.0 # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type.................. 0 Data Specification Block Type.....O Logging Direction................. Down Optical log depth units...........Feet Data Reference Point..............Undefined Frame Spacing. ... . ... . . .. . . .. . . . . .60 .1IN Max frames per record.............Undefined Absent value........ """""'" .-999 Depth Units.....................~. Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD040 FT/H 4 1 68 4 2 GR l--1WD040 API 4 1 68 8 3 RPX MWD040 OHMM 4 1 68 12 4 RPS HWD040 OHMM 4 1 68 16 5 RPM MWD040 OHMM 4 1 68 20 6 RPD MWD040 OHMM 4 1 68 24 7 FET MWD040 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 9920.5 11442 10681.3 3044 9920.5 11442 ROP MWD040 FT/H 0.59 352.09 133.892 2938 9973.5 11442 GR MWD040 API 60.37 267.65 132.503 2937 9928.5 11396.5 RPX MWD040 OHMM 1. 24 24.77 3.1236 2938 9920.5 11389 RPS MWD040 OHMM 1.27 34.09 3.29447 2938 9920.5 11389 RPM MWD040 OHMM 1. 35 29.12 3.30609 2938 9920.5 11389 RPD MWD040 OHMM 1. 37 23.65 3.39144 2938 9920.5 11389 FET MWD040 HOUR 0.23 22.27 1.93213 2938 9920.5 11389 First Reading For Entire File..........9920.5 Last Reading For Entire File...........11442 File Trailer Service name.............STSLIB.005 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......03/03/19 Maximum Physical Record..65535 File Type............... .LO Next File Name...........STSLIB.006 Physical EOF File Header Service name.............. .STSLIB. 006 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......03/03/19 Maximum Physical Record..65535 File Type................ LO Previous File Name.......STSLIB.005 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SU1'1MARY VENDOR TOOL CODE PEF NPHI FCNT NCNT RPS RPX RPM RPD FET GR RHOB DRHO ROP $ 6 ) header data for each bit run in separate files. 5 .5000 START DEPTH 11200.5 11203.0 11203.5 11203.5 11221.0 11221.0 11221.0 1122.1. 0 11221.0 11230.5 11430.0 11430.0 11442.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIHUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 CNP SLD $ STOP DEPTH 11742.5 11732.5 11733.0 11733.0 llJ64.5 11764.5 11764.5 11764.5 11764.5 11772.0 11742.5 11742.5 11808.0 BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 COMPENSATED NEUTRON STABILIZED LITHO DEN # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # 27-AUG-02 Insite 6.02 Memory 11809.0 11442.0 11809.0 16.3 17.6 TOOL NUMBER 124725 103792 119007 151842 8.500 11434.0 BARADRIL-N 9.00 46.0 10.5 15500 3.8 .250 .140 .226 .181 76.6 143.6 76.8 79.9 ) NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction.................Down Optical log depth units...........Feet Data Reference Point..............Undefined Frame Spacing.....................60 .1IN Max frames per record.............Undefined Absent value...................... -999 Depth Units... . . . .. . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD050 FT/H 4 1 68 4 2 GR MWD050 API 4 1 68 8 3 RPX MWD050 OHMM 4 1 68 12 4 RPS MWD050 OHMM 4 1 68 16 5 RPM MWD050 OHMM 4 1 68 20 6 RPD MWD050 OHMM 4 1 68 24 7 FET MWD050 HOUR 4 1 68 28 8 NPHI MWD050 PU-S 4 1 68 32 9 FCNT MWD050 CNTS 4 1 68 36 10 NCNT MWD050 CNTS 4 1 68 40 11 RHOB MWD050 G/CM 4 1 68 44 12 DRHO .MWD050 G/CM 4 1 68 48 13 PEF MWD050 BARN 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 11200.5 11808 11504.3 1216 11200.5 11808 ROP MWD050 FT/H 10.77 397. 71 90.067 732 11442.5 11808 GR MWD050 API 21. 42 343.95 94.1571 1084 11230.5 11772 RPX MWD050 OHMM 0.18 976.7 12.3342 1088 11221 11764.5 RPS MWD050 OHMM 0.22 1035.81 20.0064 1088 11221 11764.5 RPM MWD050 OHMM 0.31 1211. 42 30.2418 1088 11221 11764.5 RPD MWD050 OHMM 0.31 2000 500.612 1088 11221 11764.5 FET MWD050 HOUR 0.32 76.9 31.3831 1088 11221 11764.5 NPHI MWD050 PU-S 12.2 81.63 44.2284 1060 11203 11732.5 FCNT MWD050 CNTS 405 1240 669.004 1060 11203.5 11 7 33 NCNT MW0050 CNTS 2200 3937 2794.52 1060 11203.5 11733 RHOB ~<'JD050 G/CM 1. 941 2.99 2.34232 626 11430 11742.5 DRHO MW0050 G/CM -0.191 0.707 0.0535911 626 11430 11742.5 PEF MWD050 BARN 1. 02 15.12 6.53824 1085 11200.5 11742.5 First Reading For Entire File..........11200.5 Last Reading For Entire File...........11808 File Trailer Service name.............STSLIB.006 Service Sub Level Name... Version Number...........1.0.0 Date of Generation.......03/03/19 Maximum Physical Record..65535 Fi 1 e Type................ LO Next File Name...........STSLIB.007 Physical EOF ) Tape Trailer Service name.............LISTPE Date.....................03/03/19 Origin...................STS Tape Name................UNKNOWN Continuation Number......Ol Next Tape Name...........UNKNOWN Comments. . . . . . . . . . . . . . . . . STS LIS Reel Trailer Service name.............LISTPE Date.....................03/03/19 Origin...................STS Reel Name................UNKNOWN Continuation Number......Ol Next Reel Name...........UNKNm'm Comments.................STS LIS Physical EOF Physical EOF End Of LIS File ') Writing Library. Scientific Technical Services Writing Libra.ry. Scientific Technical Services