Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout202-191 Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator[AKDCWelllntegrityCoordinator @bp.com] Sent: Tuesday, August 20, 2013 12:56 PM To: AK, OPS GC2 OSM;AK, OPS GC2 Field O&M TL; AK, OPS GC2 Welipad Lead; AK, OPS Prod Controllers; Cismoski, Doug A; Daniel, Ryan; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead;AK, RES GPB West Wells Opt Engr;AK, RES GPB East Wells Opt Engr; Burton, Kaity;AK, OPS Well Pad SW; Regg, James B(DOA); Wallace, Chris D (DOA) Cc: AK, D&C DHD Well Integrity Engineer;AK, D&C Projects Well Integrity Engineer; Climer, Laurie A Subject: UNDER EVALUATION: W Pad Producers with Sustained Casing Pressures during TAR All, The below producer wells are ready to be brought online Under Evaluation for further diagnostics after their IA exceeded MOASP during TAR: W-16A(PTD#2031000) W-21A(PTD#2011110) W-22 (PTD#1881100) W-36(PTD#1881060) W.__ 7A(PTD#2021490) �W-38A(PTD#2021910)) / Should a well fail the warm TI FL,an email will be sent to the AOGCC with a plan forward.The producer well below will be brought online Under Evaluation to evaluate OA over MOASP for further diagnostics. W-01A(PTD#2031760) The OART results will be relayed in a separate email. Please call with any questions. sc tiED j 72 tP Regards, J�i Laurie Climer I:iircrnare. Jack L)IShroc BP Alaska - Well Integrity Coordinator G Or ,sti C>tc a t1a u^, WIC Office: 907.659.5102 WIC Email: AKDCWellIntegrityCoordinator(a)BP.com 1 Page 1 of 2 Regg, James B (DOA) PT6 *2_ —1 j From: AK, D &C Well Integrity Coordinator [AKDCWelllntegrityCoordinator @bp.com] Sent: Sunday, January 16, 2011 5:05 PM R 6 11 f 4 I1 To: Maunder, Thomas E (DOA); Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS GC2 OSM; AK, OPS GC2 Field O &M TL; AK, OPS GC2 Wellpad Lead; AK, OPS Well Pad SW; AK, OPS Prod Controllers; AK, RES GPB West Wells Opt Engr; Cismoski, Doug A; Engel, Harry R; AK, D &C Wireline Operations Team Lead; AK, D &C Well Services Operations Team Lead Cc: King, Whitney; Kirchner, Carolyn J; Holt, Ryan P (ASRC); AK, D &C Well Integrity Coordinator Subject: OPERABLE: Producer W -38A (PTD #2021910) Tubing integrity confirmed All, Producer W -38A (PTD #2021910) passed a TIFL on 1/15/11 after sustained casing pressure was reported during the shut -down. The passing T1FL confirms tubing integrity. The well has been reclassified as Operable and may be placed on production when convenient for operations. Thank you, Torin Roschinger (alt. Jerry Murphy) Well Integrity Coordinator Office (907) 659 -5102 Harmony Radio x2376 Cell (406) 570 -9630 Pager (907) 659 -5100 Ext. 1154 **NOW CLt? 7 nil From: AK, D &C Well Integrity Coordinator Sent: Friday, January 14, 2011 10:34 PM To: 'Regg, James B (DOA)'; 'Maunder, Thomas E (DOA)'; 'Schwartz, Guy (DOA)'; Cismoski, Doug A; Engel, Harry R; AK, D &C Well Services Operations Team Lead; AK, D &C Wireline Operations Team Lead; AK, OPS FS2 DS Ops Lead; AK, OPS FS2 Ops Lead; AK, OPS FS2 OSM; AK, OPS FS2 OSS; AK, RES GPB East Wells Opt Engr; AK, OPS GC3 Wellpad Lead; AK, OPS GC3 Facility & Field OTL; AK, OPS GC1 OSM; AK, OPS Prod Controllers; AK, OPS GC2 OSM; AK, OPS GC2 Ops Lead; AK, OPS GC2 Wellpad Lead; AK, OPS GC2 Field O &M TL; AK, OPS GC2 OSS; AK, OPS Well Pad DFT N2; AK, OPS GC1 Wellpad Lead; AK, OPS GC1 OSM; AK, OPS GC1 Field O &M TL; AK, RES GPB West Wells Opt Engr Cc: AK, D &C Well Integrity Coordinator; King, Whitney; Bommarito, Olivia 0; Robertson, Daniel B (Alaska); Ramsay, Gavin; Stone, Christopher; Kirchner, Carolyn J; Longden, Kaity; Phillips, Patti J; Sayed, Mohamed; Holt, Ryan P (ASRC) Subject: Producers with sustained casing pressure on IA and OA due to proration All, The following producers were found to have sustained casing pressure on the IA during the proration January 12 -14. The immediate action is to perform a TIFL on each of the wells and evaluate for IA repressurization. If any of the wells fail the TIFL, a follow up email will be sent to the AOGCC for each individual well. 11 -05A (PTD #1961570) C -15A (PTD #2090520) E -17A (PTD #2042040) E -27A (PTD #1990590) F -04B (PTD #2100870) W -01A (PTD #2031760) W -16A (PTD #2031000) W -21A (PTD #2011110) W -25A (PTD #2091020) W -38A (PTD #2021910) The following producers were found to have sustained casing pressure on the OA during the proration 1/24/2011 • • Page 2 of 2 January 12 -14. The immediate action is to perform an OA repressurization test and eva irate if the IAxOA pressure is manageable by bleeds. If the IAxOA communication is unmanageable, a follow up email will be sent to the AOGCC notifying you of the remedial plan. 09 -34A (PTD #1932010) M -21A (PTD #1930750) N -22B (PTD #2061610) All the wells listed above will be classified as Not Operable until start -up operations commence and are stable or the well passes a pressure test proving integrity. After start -up, the wells will then be reclassified as Under Evaluation with POP parameters to prevent any over - pressure incidents. Please call with any questions or concerns. Thank you, Torin Roschinger (alt. Jerry Murphy) Well Integrity Coordinator Office (907) 659 -5102 Harmony Radio x2376 Cell (406) 570 -9630 Pager (907) 659 -5100 Ext. 1154 1/24/2011 From: NSU, ADW Well Integrity Engineer ~NSUADWWeIIlntegrityEngineer@BP.com] Sent: Sunday, May 10, 2009 10:37 PM j~~,~. ~y ~~ ~C~ y To: Regg, James B(DOA); Maunder, Thomas E(DOA); NSU, ADW Well Operations ~ Supervisor; Rossberg, R Steven; Engel, Harry R; GPB, Area Mgr West (GC2/WRD); GPB, GC2 OTL; GPB, GC2 Wellpad Lead; GPB, Wells Opt Eng; GPB, Prod Controliers; GPB, Optimization Engr Cc: Quy, Tiffany; Robertson, Daniel B(Alaska); Holt, Ryan P(ASRC); NSU, ADW Well Integrity Engineer Subject: OPERABLE: W-38A (PTD #202191~ High IAP Mitigated ._.___- Follow Up Flag: Follow up Flag Status: Orange j~c~s ~ ~ -c~k All, Weli W-38A (PTD #2021910) was Under Evaluation for sustained casing pressure on the IA. Following the resumption of operations on W-Pad, the gas lift valves were chanaed out. Post gas lift valve change out the well has passed a TIFL and has proven casinq inteqritv has been restored. The well has been reclassified as Operable and may be returned to production at Operation's convenience. Please contact me with any questions. Thank you, Taylor Wellman filiing in for Anna Dube/Andrea Hughes Office: 659-5102 r n r=, Pager: 659-5100 x 1154 , y'~;~ rt~,~~~„:~ ; .~ ~: ~. .f ~~1=~~ From: NSU, ADW Well Integrity Engineer Sent: Wednesday, April 22, 2009 12:17 PM To: Regg, James B(DOA); 'Maunder, Thomas E(DOA)'; NSU, ADW Well Operations Supervisor; Rossberg, R Steven; Engel, Harry R; GPB, Area Mgr West (GC2/WRD); GPB, GC2 OTL; GPB, GC2 Wellpad Lead; GPB, Wells Opt Eng; GPB, Prod Controllers; GPB, Optimization Engr Cc: Winslow, ]ack L.; Roschinger, Torin T.; NSU, ADW Well Integrity Engineer; Robertson, Daniel B(Alaska) Subject: UNDER EVAL: W-38 (PTD #2021910) Eval high IAP Ail, Well W-38 (PTD #2021910) has been found to have sustained casing pressure on the IA. The TIOs were 2520/2510/VAC on 4/19/09. The IA was bled down to 1,260 psi and a TIFL, that failed, was performed on 04/20/09. It is suspected that open gas lift valves, produced by the unusually high IA pressure, are a possible cause for the failing TIFL. However due to SimOps issues because the pad is temporarily shut-in, we cannot peform further diagnostics on the well. The well has been reclassified as Under Evaluation for further diagnostics once the pad is back online. The plan forward for the well is as follows: 1. Ops: POP well and allow to flow 2. D: Re-TIFL 3. S: C/O GLVs if TIFL fails 4. D: Re-TIFL A wellbore schematic and TIO plot have been included for reference. 8/6/2009 OPERABLE: W-38A (PTD #2(~10) High IAP Mitigated Page 2 of 2 r • Please contact me with any questions or concerns. Thank you. « File: W-38 (PTD 2021910) TIO.pdf »« File: W-38A.pdf» ,~ason E. ~Dahlem forAnd~rea ~fughes alternate - Taylor Weliman bp Alaska - Well Integrity Engineer office: 907-659-5098 cell: 713-299-2651 pager: 659-5100 x1446 harmony: 758-2418 8/6/2009 LJNDER EVAL: W-38 (PTD #~910) Eval high IAP • Page 1 of 1 Regg, James B (DOA) From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com] (~~~ l/~ i~~j l Sent: Wednesday, April 22, 2009 12:17 PM To: Regg, James B(DOA); Maunder, Thomas E(DOA); NSU, ADW Well Operations Supervisor; Rossberg, R Steven; Engel, Harry R; GPB, Area Mgr West (GC2/WRD); GPB, GC2 OTL; GPB, GC2 Wellpad Lead; GPB, Wells Opt Eng; GPB, Prod Controllers; GPB, Optimization Engr Cc: Winslow, Jack L.; Roschinger, Torin T.; NSU, ADW Weil Integrity Engineer; Robertson, Daniel B (Alaska) Subject: UNDER EVAL: W-38 (PTD #2021910) Eval high IAP Attachments: W-38 (PTD 2021910) TIO.pdf; W-38A.pdf All, ~ Well W-38 {PTD #2021910) has been found to have sustained casin ressure on the IA. The TiOs were 2520/2510NAC on 4/19/09. The IA was bled down to 1,2 psi and a TIFL, that failed, was performed on 04/20/09. It is suspected that open aas lift valves, produced by the unusually high IA pressure, are a possible cause for the failing TIFL. However due to SimOps issues because the pad is temporarily shut-in, we cannot peform further diagnostics on the well. The well has been reclassified as Under Evaluation for further diagnostics once the pad is back online. --' The plan forward for the well is as follows: 1. Ops: POP well and ailow to flow ~J~~,~ 2. D: Re-TIFL ,~',k;y3~`~,u;, ?~v~~~ ~ ^ M 3. S: C/O GLVs if TIFL fails 4. D: Re-TIFL A wellbore schematic and TIO plot have been included for reference. Please contact me with any questions or concerns. Thank you. «W-38 (PTD 2021910) TIO.pdf» «W-38A.pdf» ,~ason ~E. ~aFtCem forAncfrea ~l'ugFies alternate - Taylor Weliman bp Alaska - Well Integrity Engineer office: 907-659-5098 cell: 713-299-2651 pager: 659-5100 x1446 harmony: 758-2418 7/29/2009 . a ~ ao°oc ~Iaoooo T ~ ~ 4 ^ O HI H ;-: 0 ~ N ~ N Q ~ a ~ ~ M 3 ~ 0 ~ N G T CJ iJ N t~ QJ O N N O ~ O N N N ~ 0 N ~ G rv 0 ¢~ N O'1 O ~ O fV OJ ~ G fJ n 0 • 0 0 0 0 e} f+"i N ~ TRFE= 4-1/16" MCEVOY WELLNEAD = 13-5/8" MCEVOY A~TUA~OF~ = OTIS KB. ELEV = 88.11' BF. E1EV = 53.21' KOP = 1000' Max Angle = 94 @ 15773' Datum MD = Datum ND = 8800' SS ~ 13-3l8° GSG, 72#, L-80, ID = 12.347" ~ ! W-38A S~OTES: WF~.~ HAS 4-1/2" 13-CR-80 TBG 2207~ N 4-112" HES X NIP, ID = 3.813" ( 2976' I Minimum ID = 3.725" @ 13877' 4-112" HES XN NIPPLE PERFORATION SUMMARY REF LOG: ANGLE AT TOP PERF: Note: Refer to Productian DB for historical perf data SIZE SPF INTERVAL Opn(Sqz DATE S~TD 14414 - 14610 O 10/31/02 SLTD 15703 - 15978 O 10/31 /Q2 S~TD 16020 - 17571 O 10i31/02 GAS LIFf MANORELS ST MD Nd DEV TYPE VLV LATCH PC7RT DATE 4 4091 3390 55 MMG-M DOME RK 16 09/12/64 3 8400 5598 57 MMG-M DC?ME RK 16 09/12/04 2 11211 7118 56 MMG-M DOME RK 16 09/12/04 1 13785 8563 53 KBG-2 SO BK 24 03/31/O6 13129' E--~ 9-5/8" X 7" BKR ZXP PKR, ID = 7.50" MILIOUT WINDOW 13339' - 13355' 13811' ~-'~ 4-1/2" HES X NIP, ID = 3.813" 13833~ ~ 7" X 4-1l2" BKR S-3 PKR, ID = 3.875" 13856' -~4-112" HES X NIP, ID = 3.$13" ~ ~$~$7~7~ 4-1 /2" HES XN NIP, ID = 3.725" c~BP ~-~ 13376~ FISH 13739' 13899' -14-112" WIEG, ID = 3.95$" ~ ,.,, ' ""' 13900~ 7" X 4-1/2" BKR ZXP LNR 7" LNR HGR 13890~ ~ TOP PKR, ID = 4.390" . . ` FISI-4-BTM ~ATCH GLV W/ 9-5l8" CSG, 47#, L-80, ID = 8.681" 14115~ ~ ` ` ~ CdLLE~'S/ WOBBIE RING . ~ ~ ~ FROM 1-1/2" RK LATCH . ~ . ~ . ~ 7" ~NR, 26#, L-80, .0383 bpf, ID = 6.276" 14850' `~ ~~ `~.` `~. 4-112" TBG, #12.6, 13-CR-80, .0152 bpf, ID = 3.958" 1389$~ . 7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" 14085~ , 4-1l2" LNR, 12.6#, L-80, ID = 3.958" 17695~ DA7E REV BY COMMEMS DATE REV BY COMMENTS 06/10/88 ORIGINAL COMPLETION 03/31/06 JRP/PJC GLV C/O 1dl31/02 DAV/KK RIG SIdETRACK (W-38A) 04/01/06 JRPIPJC SET PXN PLUG @ 13877' 12/01l03 SRB(TLP FISH 06/17106 BSFJPJC Pt1LL PXN PLUG @ 13877' 01/31/04 DAV/TLP GAS~IFTTYPECORRECTIQN 03/15/04 JLJIKAK GLV C!O 09(13l04 MVTLP FISH, NEW FISH, GLV C/O PRUDNOE SA Y UNlT WEl.~: W-38A PERMIT No: ~2021910 Af~ No: 50-Q29-21807-60 SEC 21, T11 N, R12E, 1356' SNL & 1453' WEl BP Euploration {Alaska) Well Job# Log Description Date BL Color CD L5-23 11733320 PRODUCTION PROFILE 04/30/07 1 W-38A 11660532 MEM PROD PROFILE 05/02/07 1 Z-38 11660534 MEM PROD PROFILE 05/05/07 1 17-22 11745213 LDL 04/29/07 1 W-19A 11628772 MEM PROD PROFILE 05/07/07 1 Y-24 11630477 LDL 05/08/07 1 16-08A 11686747 LDL OS/20/07 1 G-05 11773110 LDL 05/13/07 1 16-03 11686743 LDL 05/11/07 1 14-07 11637334 PRODUCTION PROFILE 05/08/07 1 V-03 11628770 MEM LDL 04/30/07 1 MPF-91 11628759 MEM TEMP SURVEY 03/09/07 1 MPF-89 11628758 MEM TEMP SURVEY 03/08/07 1 MPS-10A 11638630 INJECTION PROFILE 05/07/07 1 B-34 11594500 INJECTION PROFILE OS/22/07 1 04-10 11594498 LDL 05/19/07 1 B-07 11657125 PRODUCTION PROFILE 05/11/07 1 H-24 11745216 PPROF/GLS 05/02/07 1 04-24 11773112 PRODUCTION LOG 05/19/07 1 C-28A N/A LDL 05/09/07 1 M-07 11630476 LDL 05/07/07 1 P1-14 11745214 INJECTION PROFILE 04/30/07 1 P1-16 11594494 INJECTION PROFILE 05/01/07 1 Schlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth dUN 1 1 Z007 Commis$iC!1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 5CANNED JUN ,2 1 2007 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: ~Od -Ie; ( 'ófrJ 06/07107 NO. 4290 Company: State of Alaska Alaska Oil & Gas Cons Comm AUn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay . . Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth ~ Received by: r~ --- . STATE OF ALASKA _ ALA OIL AND GAS CONSERVATION COM~ON REPORT OF SUNDRY WELL OPERATIONS P.O. Box 196612 Anchorage, Alaska 99519- 6612 7. KB Elevation (ft): 88.1 Plug Perforations Perforate New Pool 0 Perforate 0 4. Well Class Before Work: Development 0 Stratigraphic 0 1. Operations Abandon Repair Well Performed: Alter Casing 0 Pull Tubing 0 Change Approved Program 0 Operat. Shutdown 0 2. Operator BP Exploration (Alaska), Inc. Name: Other.¡ Set TTP WaiverD Time Extension 0 Re-enter Suspended Well 0 5. Permit to Drill Number: 202-191 6. API Number: 50-029-21807-01-00 9. Well Name and Number: W-38A 10. Field/Pool(s): Prudhoe Bay Field 1 Prudhoe Bay Oil Pool Exploratory 0 Service 0 3. Address: 8. Property Designation: ADL-047453 11. Present Well Condition Summary: Total Depth measured 17700 feet true vertical 9005.58 feet Effective Depth measured 17700 feet true vertical 9005.58 feet Casing Length Size MD Conductor 80 20" Conductor 30 - 110 Surface 2947 13-3/8" 72# L-80 29 - 2976 Production 13311 9-5/8" 47# L-80 28 - 13339 Liner 906 7" 26# L-80 13129 - 14035 Slotted Liner 3795 4-1/2" 12.6# L-80 13900 - 17695 Plugs (measured) 13877 Junk (measured) 13400 TVD Burst Collapse 30 - 110 29 - 2716 5380 2670 28 - 8294.98 6870 4760 8168.63 - 8712.65 7240 5410 8632.35 - 9004.49 8440 7500 Perforation depth: Measured depth: 14414 - 17574 Closed True Vertical depth: 8875.48 - 8978.46 Closed Tubing: (size, grade, and measured depth) 4-1/2" 12.6# L-80 13898 Packers and SSSV (type and measured depth) 7" Baker ZXP Packer 4-1/2" Baker S-3 Packer 4-1/2" ZXP Liner Top Packer 13129 13833 13900 12. Stimulation or cement squeeze summary: Intervals treated (measured): RBDMS BFl MAY 3 0 2006 Treatment descriptions including volumes used and final pressure: Oil-Bbl Representative Daily Average Production or Injection Data Gas-Mcf Water-Bbl Casing Pressure SHUT-IN SHUT-IN Tubing Pressure 13. Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations 15. Well Class after work: Exploratory 0 16. Well Status after work: oil0 Gas 0 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Development 0 Service 0 x WAG 0 GINJ 0 WINJ 0 WDSPL Sundry Number or NIA if C.O. Exempt: NIA o Contact Sharmaine Vestal Title Data Mgmt Engr Phone 564-4424 Date 5/24/2006 Form 10-404 Revised 04/2006 Submit Original Only . . , W-38A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY I ACTIVITYDATE ISiWMM~R'¡f 3/30/2006 SET 4.5" PXN PLUG BODY @ 13,863' SLM. RAN 4.5" CHECK-SET TO 13,863...CAME BACK SHEARED FLUIDS PUMPED I BBLS : : TOTAL W-38A (PTD #2021910) Classified as Problem Well e e Subject: W-38A (PTD #2(21910) Classified as Problem Well From: "NSU, ADW \Vclllntegrity Engineer" <NSUADWWel1IntcgrityEngineer@BP.com> Date: Mon, OC) Mar 2006 14:05:48 -0900 To: "Rossbcrg, R Steven" <Stcven.Rossberg@BP.com>, "NSU, ADW Well Operations Supervisor" <NSUADWWeIlOperationsSupervisor@BP.com>, "GPB, Wells Opt Eng" <GPB W ellsOptEng@BP.com>, jim _regg@.admin.state.ak.us, winton _ aubert@admin.state.ak.us, "NSU, ADW WL & Completion Supervisor" <NSUADWWL&CompletionSupervisor@BP.com>, "Kurz, .John" <john.kurz@BP.com>, "GPB, GC2 Area Mgr" <GPBGC2TL@BP.com>, "GPB, Optimization Engr" <GPBOptimizationEngr@BP.com>, "GPB, GC2 Wellpud Lead" <GPBGC2WclIpadLead@BP.com>, "GPB, GC2 OTL" <gpbgc20tl@BP.com>, "OPB, Well Pads SW (GPBWeIIPadsWZL V@BP.com)" <.IMCEAEX- _ O=BP _ OU=USAPBU _ cn=Recipients_ cn=PBUW eIlPadsSWZ@BP.com>, "Robertson, Daniel B (Alaska)" <Danicl.B.Robcrtson@BP.com> CC: "Hughes, Andrea (VECO)" <hugha4@BP.com>, "NSU, ADW Wel1 .Integrity Engineer" <NSUAD\V\Vcl1IntegrityEngincer@BP.com>, "MCCOLLUM, CODY 0 (VECO)" <Cody.McCollum@BP.com> All, Well W-38A (PTD #2021910) has sustained casing pressure on the IA & OA and has been classified as a Problem well. Wellhead pressures on 3/05/06 were 2390/2410/1580. Plan forward is as follows: 1. DHD: TIFL 2. FB: Freeze protect well 3. CAM: Evaluate wellhead seals Attached is a wellbore schematic. Please call if you have any questions. «W-38A.pdf» Joe Anders, P.E. Well Integrity Coordinator, BP Exploration, (Alaska) Inc. Work: 1-907-659-5102 Mobile: 943-1154 Pager: 659-5100, x1154 Email: NSUADWWelllntegrityEngineer@bp.eom r\ t) /. Content-Description: W-38A.pdf Content-Type: application/octet-stream Content-Encoding: base64 S(f }JCW/.f JA.. 2.4\oPS: b£.7ti>: O~ I çtWes; -:} 3VJrs: %~tP 3-sìti 2'ì'lo ~V{ <31 S (ðç. J' 0 t- r- Cß4C(-z- L4'D~ MJt{f \ I of I 3/8/2006 2:50 PM e TREE = 4-1/16" r.tCBlOY W8...LHEAD = 13-518" r.tCBlOY A CTU6. TOR = OTIS KB. ELEV - 88.11' BF. ELEV = 53.21' KOP = 1000' Max Angle = 94 @ 15773' DatumMD= DatumlVD = 8800' SS W-38A SAFEfYNOTES: WB.LHAS 4-112" 13-CR-80TBG 2207' 4-1/Z' HESX NIP, ID=3.813" 13-318" CSG, 72#. L-80,ID= 12.347" H 2976' Minimum ID = 3.725" @ 13877' 4-1/2" HES XN NIPPLE GAS LIFT MANDRELS ST MD lVD DBI TYPE VLV LA TCH PORT Dð.1E 4 4091 3390 55 MIIIk3-M OOI\lE RK 16 09/12/04 3 8400 5598 57 MIIIk3-M OOI\lE RK 16 09/12/04 2 11211 7118 56 MIIIk3-M OOI\lE RK 16 09/12/04 1 13785 8563 53 KBG-2 SO INTG 24 09/12/04 9-518" X 7" BKRZXPPKR. D -7.50" PERFORATION SUMMA.RY R8'" LOG: ANGLE A TTOP PERF: II«:>te: Refer to A"oductbn DB for historical perf data SIZE SPF INTERVAL OpnlSqz DATE SLTD 14414- 14610 0 10/31/02 SLTD 15703- 15978 0 10/31/02 SLTD 16020 - 17571 0 10/31/02 MILL OUT WINDOW 13339' - 13355' 9-5/8" CSG.47#, L-80, ID= 8.681" 4-112" HESX NIP, ID -3.813" 7" X 4-lIZ' BKRS-3 PKR. ID - 3.875" 4-1/2" HESXN NIP. ID- 3.725" 13890' 7" X4-1/2"BKRZXPLNR TOPPKR, D = 4.390" 4-1/2" TBG. #12.6. 13-eR-80. .0152 bpf. ID - 3.958" , , , , , , , , , , , , , , FISt-I-BTM LATCH GLV W/ eOLLErS/WOBBLE RING FROM 1-112" RK LATCH 14115' 7" LNR. 26#, L-80. .0383 bpf.ID = 6.276" 14850' 4-112" LNR 12.6#. L-80. ID - 3.958" 17695' DATE 06/10/88 10/31/02 01114/03 06/07/03 07/19/03 12/01/03 REV BY COfl¡f,¡1ENTS ORIGINAL COMPLETION DA V/KK RIG SIDETRACK (W-38A PJFHLH CORRECTED 13-CR TBG MHrrLH GL V C/O JBM'KK GL V C/O SRBlTLP RSH Dð. TE 01131/04 03/15/04 09/13/04 RBI BY COfl¡f,¡1ENTS DAVIlLP GAS LIFT TYÆ CORRECTION JUKAK GL V C/O MlTLP FISH. NEW FISH. GL V C/O FRUDHOE ßII. Y UNrr W8...L: W-38A PERMrr No: 202191 0 A PI No: 50-029-21807-60 SEC21, T11N. R12E,1356'SNL&1453'WEL BP Exploration (Alaska) . . MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFicbe\CvrPgs _lnserts\Microfilm _ Marker.doc ) ) WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation ComIn. Attn.: Howard Okland 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 February 23, 2004 RFrI=I'IED OCT 2 (1 2005 RE: MWD Formation Evaluation Logs: W-38A, .'/'".'¡"~" ~~ommission: AI(-~1~~Q~4 W-38A: Digital Log Images: 50-029-21807 -01 ~c~ l)~~ I:~~ I -SJJ ç- 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date:;27 (S '&-~, Signed: $tANNEr) OCT 3 1 2005 ~ ÒÌ\ ~ I q I JD. At'>~. . '~...~'J\ 5 ',~ ''Y \ tJ f'\ ìJ DATA SUBMITTAL COMPLIANCE REPORT 10/29/2004 Permit to Drill 2021910 Well Name/No. PRUDHOE BAY UNIT W-38A Operator BP EXPLORATION (ALASKA) INC API No. 50-029-21807-01-00 / MD 17700J' TVD 9005./ Completion Date 10/31/2002 t../ Completion Status 1-01L REQUIRED INFORMATION DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: Logl Electr Data Digital Dataset Type Med/Frmt Number ~ Rpt, -~ D 'R-p( &ïJ. , "Rpt "",,.R"pt ~ -W' C Pdf Mud Log No Samples No MWD, GR, RES, PWD, ASI ~70 Name Directional Survey Directional Survey LIS Verification Log Log Run Scale Media No 1 LIS Verification AÎrectional Survey r Directional Survey Leirectional Survey --6í~ectional Survey ~01 Gamma Ray Well Cores/Samples Information: Name Interval Start Stop Received Sent ADDITIONAL INFORMATION Well Cored? Y m) Chips Received? --vïÑ"' Analysis Received? Comments: Daily History Received? Formation Tops '/N Current Status 1-01L ~i2'~ Directional Survey ~\}.ÅA- (data taken from Logs Portion of Master Well Data Maint) Interval OH / Start Stop CH Received Comments 13297 17700 Open 11/12/2002 13297 17700 Open 11/19/2002 13332 17646 Open 4/17/2003 13332 17646 Open 4/17/2003 13297 17700 Open 11/19/2002 MWD 13297 17700 Open 11/12/2002 MWD 13297 17700 Open 11/19/2002 MWD 13297 17700 Open 11/19/2002 13366 17700 Open 4/23/2004 GM,EWR, ROP .~ Sample Set Number Comments ~ ~/N 0N DATA SUBMITTAL COMPLIANCE REPORT 10/29/2004 Permitto Drill 2021910 Well Name/No. PRUDHOE BAY UNIT W-38A Operator BP EXPLORATION (ALASKA) INC API No. 50-029-21807-01-00 MD 17700 TVD 9005 ¡1:etion Date 1013112002 Completion Status 1-01L Current Status 1-01L UIC N Compliance Reviewed By: Date: ~9( þ~ JJlJv 'i ~ '-- ) " , eZO::l- /'11 WELL LOG TRANSMITTAL To: State of ~AJaska Alaska Oil and Gas Conservation Comm. Attn.: Howard Okland 333 West 7th Avenue, Suite 100 }\nchorage, Alaska 99501 April 22, 2004 RE: MWD Formation Evaluation Logs: W-38A, AK-MW-22164 W-38A: Digital Log Images: 50-029-21807-01 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Speny-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date: ~fþ f ~) } aca-Iq/ (/10 '0 WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska March 31, 2003 RE: MWD Formation Evaluation Logs W-38A, AK-MW-22164 1 LDWG formatted Disc with verification listing. PùPI#: 50-029-21807-01 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Rob Kalish 6900 Arctic Blvd. Anchorage, Alaska 99518 BP Exploration (Alaska) Inc. Petro-Technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date: ~,LJ s~:/!~ 6.~~~ RECE\VED APR 1 7 2003 " '" ,... . '. , f", ~~~n Alaska Oh & Gas l;Qh8. \.lJ¡...H~t.!U Mch~~ ) ) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well 1m Oil 0 Gas 0 Suspended 0 Abandoned 0 Service 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface rr;'r~~¡;'~~;";::;:;f\;T1 I I }} '.t0~\ii t~.): l hJ~1¡ ~, . f~,r. ~-'~... 1356 SNL, 1453 WEL, SEC. 21, T11N, R12E, UM \... DJ..'Tr:: . ~.. ..¡qOCA.....'. J' At top of produc~ive interval 1 it> ,; ~:l_~~ J "~l.',ii 4579 SNL,2161 WEL, SEC. 29, T11N, R12E, UM !............~",..'.'.-"c.-.;r....r~ ~... "j .~..... ~..,.'...'.. .. '-¡...(.)..'.:.. At total depth ~ '3" ,.." t ~ . ~ ~'Äl'i~j 2368' SNL, 416' WEL, SEC. 29, T11N, R12E, UM ~:::.,_..,~..::=:':J '~I,- ,- ' :::1 5. Elevation in feet (indicate KB, OF, etc.) 6. Lease Designation and Se'trc11'T:l({,~,,~<,~~1 KBE = 88.1' ADL 047453 12. Date Sgudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 1 0-~O02 j]) 10-27-2002 r " 10-31-2002 .. 17. Total b~Pth (MO+TVD) 18. Plug Back Depth (MO+TVD) 19. Directional Survey 17700 9005 FT 17700 9005 FT 1m Yes 0 No 22. Type Electric or Other Logs Run MWD, GR, RES, PWD, ABI Classification of Service Well 7. Permit Number 202-191 8. API Number 50-029-21807-01 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number W-38A 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 15. Water depth, if offshore 16. No. of Completions N/A MSL One 20. Depth where SSSV set 21. Thickness of Permafrost (Nipple) 2207 MD 1900' (Approx.) ...,/AI~ /3!.3'311' /?J.£> ~(Z 9s""7'Y-Þ 23. CASING SIZE WT. PER FT. GRADE 20" Conductor 13-3/8" 68# L-80 9-5/8" 47# L-80 7" 26# N-80 4-1/2" 12.6# L-80 CASING, LINER AND CEMENTING RECORD SETTING DEPTH HOLE Top BOTTOM SIZE Surface 110' Surface 2976' Surface 13339' 13129' 14035' 13900' 17695' CEMENTING RECORD 8 cu yds Concrete 17-1/2" 4546 cu ft Cold Set II 12-1/4"3062 cu ft Class 'GI 8-1/2" 202 cu ft Class 'G' 6-1/8" Uncemented Slotted Liner 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 4-1/2" Slotted Liner MD TVD MD TVD 14414' - 14610' 8875' - 8932' 15703' - 15978' 8936' - 8917' 16020' -17571' 8915' - 8722' 25. SIZE 4-1/2", 12.6#, L-SO 1 13CrSO AMOUNT PULLED TUBING RECORD DEPTH SET (MD) 13899' PACKER SET (MD) 13833' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 2200' Freeze Protected with 140 Bbls of Diesel 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) November 19, 2002 Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBL 11/22/2002 4 TEST PERIOD 2432 Flow Tubing Casing Pressure CALCULATED OIL-BBL Press. 24-HoUR RATE GAs-McF 3297 GAs-McF WATER-BBL 3030 WATER-BBL CHOKE SIZE 176 OIL GRAVITY-API (CORR) 25.5 GAS-OIL RATIO 1355 28. CORE DATA [) I: r I: I V E D Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. SUbmi~rt:c\!£>~ No core samples were taken. Form 10-407 Rev. 07-01-80 ~BDMS BFl } G~ DEC \ 3 2002 ~.... ~ 'I DEC 10 2002 Alaska Oil & Gas Gons. Commission Anchorage Submit In Duplicate ) ) 29. Geologic Markers 30. Formation Tests Marker Name Measured Depth True Vertical Depth Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. Top of Sag River 14052' Top Shublik A 14094' Top of Sadlerochit Zone 48 14400' Top of Sadlerochit 15998' Top of Sadlerochit 46P 16592' Top of Sadlerochit 45P 17545' Top of Sadlerochit 44P 17594' 8722' 8746' 8870' 8916' 8938' 8972' 9005' RECEIVED DEC 1 0 2002 Alaska Oil & Gas Cons. Commission Anchorage 31. List of Attachments: Summary of Daily Drilling Reports, Surveys 32. I ~erebY certify that the fO~ing ~s true ~~d correct to the best of my knowledge SIgned Terrie Hubble r1.C7.Jt/t<.1. ~ Title Technical Assistant Date 1;:2.. -09.ð ~ W-38A 202-191 Prepared By Name/Number: Sandra Stewman, 564-4750 Well Number Permit N9. / Approval No. Drilling Engineer: Michael Triolo, 564-5774 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells; Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Legal Name: W-38A Common Name: W-38A Test Date 10/13/2002 1 0/20/2002 FIT FIT Test Type Test Depth (TMD) 13,339.0 (ft) 14,035.0 (ft) BP EXPLORATION Leak-Off Test Summary Test Depth (TVD) 8,312.0 (ft) 8,725.0 (ft) AMW 11.20 (ppg) 8.50 (ppg) Surface Pressure 710 (psi) 550 (psi) Leak Off Pressure (BHP) 5,546 (psi) 4,403 (psi) Page 1 of1 EMW 12.84 (ppg) 9.71 (ppg) '"-,,,/ .~ Printed: 11/4/2002 2:21 :06 PM ') .......j;,. .) BP EXPLORATION Operations .SummaryReport Page 1 of 20 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: W-38A W-38A REENTER+COMPLETE DOYON DOYON 14 Start: 9/30/2002 Rig Release: 10/31/2002 Rig Number: 14 Spud Date: 6/10/1988 End: 10/31/2002 Date From '-To Hours Task Code NPT Phase Description of Operations 9/30/2002 06:00 - 00:00 18.00 MOB P DECOMP Mob rig from S-114a to W-38. Center rig over well. Sheave rig. Skid rig floor. Take on sea water. Ru cellar and rig floor. Rig accept @ 22:00 hrs, 09-30-2002. 10/1/2002 00:00 - 01 :00 1.00 PUll P DECOMP Held PJSM. Skidded Rig Floor into Position. Set Cuttings Tank, R I U Drlg Floor. Took on Sea Water. 01 :00 - 02:00 1.00 PUll P DECOMP R I U Circulating lines to Production Tree. Tested lines to 3,500 psi, OK. 02:00 - 03:00 1.00 PUll P DECOMP Held PJSM. R I U DSM, Pulled BPV, RID DSM. 03:00 - 06:00 3.00 PUll P DECOMP Attempted to Circulate Out Diesel Freeze Protect. Pumped Down lA, Pump Rate 4 bpm, Pumped a Total of 60 bbls, No Returns. lined up on Tubing, Pumped Down Tubing, Rate 4 bpm, Pumped a Total of 50 bbls, No Returns. lined Back up on lA, Pumped Down lA, Pump Rate 4 bpm, Pumped a Total of 38 bbls, No Returns. 06:00 - 07:00 1.00 PUll P DECOMP Rigged Down Circulating lines. 07:00 - 08:00 1.00 PUll P DECOMP Held PJSM. R I U DSM, Set TWC, RID DSM. 08:00 - 09:00 1.00 WHSUR P DECOMP Held PJSM. N I D Production Tree and Adapter Flange, Checked Tubing Hanger Threads, Checked XO Make Up in Hanger, OK. 09:00 - 11 :00 2.00 BOPSUR P DECOMP Held PJSM. N / U 13-5/8" x 5,000 psi BOP Stack. Hydril Annular Preventer, Top Pipe Ram wi 2-7/8" x 5" Variable Rams, Blind Ram, lower Pipe Rams wi 3-1/2" x 6" Variable Rams. 11 :00 - 13:00 2.00 BOPSURP DECOMP Held PJSM. R I U to Test BOPE Equipment. 13:00 -14:00 1.00 BOPSURP DECOMP Tested BOPE. Attempted to Test Upper Pipe Rams, Rams would not Test. 14:00 -15:00 1.00 BOPSURP DECOMP Changed out Top Pipe Rams to 4-1/2" x 7" Variables. 15:00 - 17:30 2.50 BOPSURP DECOMP Tested BOPE. Tested Upper Rams, Stand Pipe Manifold, Choke Manifold, Valves, HeR, Kill line, Choke line, Floor Valves and IBOP to 3,500 psi High I 250 psi low. Tested Annular Preventer to 2,500 psi High 1250 psi low. All Tests Held f/5 Min. All Pressure Tests Held wi No leaks or Pressure loss. Witnessing of BOPE test by Chuck Sheave-AOGCC. 17:30 - 18:00 0.50 BOPSUR P DECOMP RID BOPE Test Equipment. 18:00 - 20:00 2.00 BOPSUR P DECOMP Held PJSM. M I U and Installed Shooting Flange. R I U DSM lubricator, Pulled TWC, Well on Vacuum. RID DSM. 20:00 - 21 :30 1.50 PUll P DECOMP Held PJSM. R I U Equipment to Pull Tubing. M I U 1 Joint 4" DP and XO to 4" TDS Threads. RIH and Screwed into Tubing Hanger. Backed Out lock Down Screws. 21 :30 - 22:00 0.50 PUll P DECOMP Pulled on Tubing Hanger and String. Tubing and Hanger Pulled Free at 185,000#, String Weight 172,000#. Pulled Tubing Hanger 5' Above lockdowns. 22:00 - 23:00 1.00 PUll P DECOMP Finished Building lost Circulation Hi-Vis and Salt Pills. 23:00 - 00:00 1.00 PUll P DECOMP Pumped and Spotted 50 bbl Hi-Vis lead, Followed by 40 bbl Salt Pill, Followed by 50 bbl Hi-Vis Tail. Pump Rate 6 bpm, 0 psi. Observed Returns with 40 bbl of Hi-Vis lead Pumped away into Perforations at 14,355'-14,395'. Spotted 40 bbl Salt Pill on Perfs, Shut Down Pump. Circulated Back Good Show of Gas. 10/2/2002 00:00 - 01 :00 1.00 PUll P DECOMP Held PJSM. Closed Annular. Squeezed 2 bbl of Salt Pill into Perforations at 14,355' - 14,395'. Pump Rate 2 bpm, 0 psi. Shut Down Pumps Waited 10 minutes. Squeezed 5 bbl of Salt Pill into Perforations. Pump Rate 2 bpm, 0 psi. Shut Down Printed: 11/4/2002 2:21: 12 PM ') ') BP EXPLORATION Operation$ Summary Report Page 2 of "20 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: W-38A W-38A REENTER+COMPLETE DOYON DOYON 14 Start: 9/30/2002 Rig Release: 10/31/2002 Rig Number: 14 Spud Date: 6/10/1988 End: 10/31/2002 Date From -To Hours Task Code NPT Phase Description of Operations 10/2/2002 00:00 - 01 :00 1.00 PULL P DECOMP Pumps Waited 10 minutes. Squeezed another 10 bbls of Salt Pill into Perforations. Pump Rate 2 bpm, 0 psi. Shut Down Pumps Waited 10 minutes. Squeezed 16 bbls of Salt Pill into Perforations. Pump Rate 2 bpm, 0 psi. Shut Down Pumps. 01 :00 - 02:30 1.50 PULL P DECOMP Attempted to Circulate Out Diesel through Choke and Gas Buster. Beginning Pump Rate 2 bpm, 0 psi. 90% Returns, Very Gassy Diesel, Pumped 20 bbls. Increased Pump Rate to 4 bpm, 0 psi. Observed the Following Returns: Bbls Pmp'd Returns Wellbore Fluid 50 70% Very Gassy Diesel 70 50% Very Gassy Diesel 90 40% Very Gassy Diesel 120 30% Gassy Diesel 150 20% Gassy Diesel 170 10% Gassy Diesel 02:30 - 03:00 0.50 PULL P DECOMP Shut Down Pump and Opened Annular Preventer. Observed Fluid in Well Dropping. Started Pump and Filled the Hole, Shut Down Pump and Observed Well. Fluid in Well Dropping, Filled the Hole. Losses of 3 bpm. 03:00 - 09:00 6.00 PULL P DECOMP Observed and Kept Hole Full While Building Second Salt Pill. Static Losses Started at 3 bpm, Increased to 5 bpm. Loaded 4" DP into Pipe Shed. 09:00 - 10:30 1.50 PULL P DECOMP Pumped and Spotted 50 bbl Hi-Vis Lead, Followed by 40 bbl Salt Pill, Followed by 20 bbl Hi-Vis Tail, Displaced w/192 bbls of Seawater. Pump Schedule as Follows: Bbls Pmp'd Rate Pressure Remarks 40 6bpm DP-40 psi / Csg-30 psi Hi-Vis Lead 67 6bpm DP-70 psi / Csg-40 psi Salt Pill 100 6bpm DP-50 psi / Csg-40 psi Hi-Vis Tail 167 6bpm DP-30 psi / Csg-70 psi Seawater 195 5bpm DP-40 psi / Csg-11 0 psi Seawater 228 4bpm DP-30 psi / Csg-150 psi Hi-Vis @ Perfs 278 2bpm DP-30 psi / Csg-180 psi Salt Pill @ Perfs 338 4bpm DP-40 psi / Csg-180 psi SW @ Perfs Shut Down Pump. Bled Down DP and Csg to 0 psi. Monitored Well, Well Static. 10:30 - 11 :30 1.00 PULL P DECOMP Pulled Tubing Hanger to Rig Floor. Disconnected Control Lines. Broke out and L /04" DP. Broke out and L / 0 Tubing Hanger. L / 0 6 Jts of 4-1/2" Tubing, Spooled up Dual Encapsulated Control Line. 11 :30 - 12:00 0.50 PULL P DECOMP M / U XO's to Tubing, M / U Top Drive. 12:00 - 16:00 4.00 PULL P DECOMP Held PJSM. Closed Annular Preventer. Circulated out Gas and Diesel from Well through Choke. Pump Rate 4 bpm, 50 psi. 60 bph Losses. 16:00 - 21 :30 5.50 PULL P DECOMP Shut in Well and Monitored Losses while Building 100 bbl Baracarb Pill. Average Losses 95 bph. 21 :30 - 00:00 2.50 PULL P DECOMP Pumped and Spotted 100 bbl Baracarb Pill to end of 4-1/2" Tubing at 13,464', Pump Rate 7 bpm, 60 psi. Losses while Spotting Pill 1 00 bph. Closed Annular Preventer and Bullheaded Pill to Perforations at 14,355' - 14,395', Pump Rate 3 bpm, 100 psi. Squeezed Baracarb Pill into Perforations, Printed: 11/4/2002 2:21:12 PM ) BP EXPLORATION Operations Summary Report Page 3 of 20 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: W-38A W-38A REENTER+COMPLETE DOYON DOYON 14 Start: 9/30/2002 Rig Release: 10/31/2002 Rig Number: 14 Spud Date: 6/10/1988 End: 10/31/2002 Date From- To Hours Task Code NPT Phase Descri ption of Operations 1 0/2/2002 21 :30 - 00:00 2.50 PULL P DECOMP Schedule as Follows: Bbls Sqz'd Rate Pressure Remarks 1 2 bpm DP-70 psi 1 Csg-180 psi 1.5 2 bpm DP-220 psi 1 Csg-350 psi Shut Down fl 5 minutes, Pressure DP-20 psi 1 Csg-70 psi 1 2 bpm DP-80 psi 1 Csg-150 psi 2 2 bpm DP-120 psi 1 Csg-230 psi 3 2 bpm DP-250 psi 1 Csg-350 psi Total 4.5 bbls Sqz'd Shut Down fl 5 minutes, Pressure DP-20 psi 1 Csg-90 psi 0.5 2 bpm DP-110 psi 1 Csg-180 psi 1.5 2 bpm DP-200 psi 1 Csg-270 psi 2.5 2 bpm DP-290 psi 1 Csg-350 psi Total 7 bbls Sqz'd Shut Down fl 5 minutes, Pressure DP-20 psi 1 Csg-80 psi 1 2 bpm DP-150 psi 1 Csg-200 psi 2.5 2 bpm DP-310 psi 1 Csg-350 psi Total 9.5 bbls Sqz'd Shut Down fl 5 minutes, Pressure DP-50 psi 1 Csg-1 00 psi 1 2 bpm DP-220 psi 1 Csg-230 psi 2 2 bpm DP-320 psi 1 Csg-350 psi Tota111.5 bbls Sqz'd Shut Down fl 5 minutes, Pressure DP-100 psi 1 Csg-140 psi 1 2bpm DP-290 psi 1 Csg-300 psi 1.5 2 bpm DP-330 psi 1 Csg-350 psi Total 13 bbls Sqz'd Shut Down fl 5 minutes, Pressure DP-180 psi 1 Csg-210 psi 0.5 2 bpm DP-270 psi 1 Csg-280 psi 1 2 bpm DP-340 psi 1 Csg-350 psi Total 14 bbls Sqz'd Shut Down fl 5 minutes, Pressure DP-200 psi 1 Csg-220 psi 0.5 2bpm DP-300 psi 1 Csg-300 psi 1 2bpm DP-340 psi 1 Csg-350 psi Total 15 bbls Sqz'd Shut Down fl 5 minutes, Pressure DP-21 0 psi 1 Csg-240 psi 0.5 2 bpm DP-350 psi 1 Csg-350 psi Tota115.5 bbls Sqz'd Shut Down fl 5 minutes, Pressure DP-21 0 psi 1 Csg-230 psi Bled All Pressures Down to 0 psi 1 2 bpm DP-140 psi 1 Csg-150 psi 2 2 bpm DP-330 psi 1 Csg-350 psi Tota117.5 bbls Sqz'd Shut Down fl 5 minutes, Pressure DP-220 psi 1 Csg-250 psi Bled All Pressures Down to 0 psi 1 2bpm DP-200 psi 1 Csg-200 psi 1.8 2 bpm DP-350 psi 1 Csg-350 psi Tota119.3 bbls Sqz'd Bled All Pressures Down to 0 psi. Opened Annular Preventer, Well Static. Total Baracarb Squeezed into Perforations 19.3 bbls, 80.7 bbls Baracarb Pill left in Hole above Perforations. 10/3/2002 00:00 - 00:30 0.50 PULL P DECOMP Held PJSM. Monitored Well, Well Static. 00:30 - 02:00 1.50 PULL P DECOMP POOH, LID 50 Jts 4-1/2" 12.6# TDS Tubing, SSSV Assembly. Spooled Up Dual Encapsulated Control Line while POOH. Printed: 11/4/2002 2:21 :12 PM ') BP EXPLORATION Operations Summary Report Page 4 of 20 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: W-38A W-38A REENTER+COMPLETE DOYON DOYON 14 Start: 9/30/2002 Rig Release: 10/31/2002 Rig Number: 14 Spud Date: 6/10/1988 End: 10/31/2002 Date From - To Hours Task Code NPT Phase Desctiptionof Operations 1 0/3/2002 00:30 - 02:00 1.50 PULL P DECOMP Recovered 4 Stainless Steel Bands and 25 Rubber CL Clamps. 02:00 - 02:30 0.50 PULL P DECOMP Rigged Down Camco Spooling Equipment and Cleared Rig Floor. 02:30 - 03:00 0.50 PULL P DECOMP POOH, L / D 10 Jts 4-1/2" Tubing. 03:00 - 03:30 0.50 PULL P DECOMP Serviced Rig. 03:30 - 04:00 0.50 PULL N RREP DECOMP Repaired Pipe Skate 04:00 - 10:30 6.50 PULL P DECOMP POOH, L / D 4-1/2" 12.6# TDS Tubing. Recovered: 342 jts of 4-1/2" Tubing, 5 GLM Assemblies, 1 SSSV Assembly, 2 x 10 ft space out pups, Cut Off Joint of 4-1/2" Tubing - 22.05'. Calculated Hole Fill 62.72 bbls, Actual Fill 64 bbls. No Losses, Fluid in Well Static. 10:30 - 11 :00 0.50 PULL P DECOMP R / D Tubing Handling Equipment. 11 :00 - 12:00 1.00 BOPSURP DECOMP Held PJSM. Changed out Upper Pipe Rams to 2-7/8" x 5" Variables. 12:00 - 13:00 1.00 BOPSURP DECOMP Held PJSM. R / U Equipment to Test BOPE. Ran and Set Test Plug and Test Joint. 13:00 - 13:30 0.50 BOPSUR P DECOMP Tested Upper Rams and Lower Pipe Rams to 3,500 psi High / 250 psi Low. All Tests Held f/5 Min. All Pressure Tests Held w/ No Leaks or Pressure Loss. Witnessing of BOPE Test Waived by John Crisp-AOGCC Rep. 13:30 - 14:00 0.50 BOPSUR P DECOMP Pulled Test Plug, L / D Test Joint. Ran and Set Wear Bushing. Wear Bushing I.D. = 8.75". R / D Test Equipment. 14:00 - 15:00 1.00 FISH P DECOMP Held PJSM. R / U to Run Fishing BHA and 4" DP. Brought Fishing BHA Components up to Rig Floor. Monitored Well, Well Static, No Losses. 15:00 - 17:30 2.50 FISH P DECOMP Held PJSM. M / U Fishing BHA: 8-1/2" Mill Shoe - 8-1/8" Guide Bowl and Overshot Extension w/4-1/2" Basket Grapple - Top Sub - Bumper Sub - 9'x 6-3/4" D.C. - 6-1/4" Oil Jars - Sub - 21 x 4" HWDP. BHA Length 957.75'. Top of Fish 13,724'. 17:30 - 21 :00 3.50 FISH P DECOMP RIH w/ Fishing BHA, P / U and Drifted 4" Drill Pipe. RIH to 5,936'. 21 :00 - 22:30 1.50 FISH P DECOMP Held PJSM. Slipped and Cut 119' of Drilling Line. Serviced Top Drive. Monitored Well, Well Static, No Losses. 22:30 - 00:00 1.50 FISH P DECOMP RIH w/ Fishing BHA, P / U and Drifted 4" Drill Pipe. RIH to 8,200'. 10/4/2002 00:00 - 04:00 4.00 FISH P DECOMP Held PJSM. RIH w/ Fishing BHA, P / U and Drifted 4" Drill Pipe. RIH to 13,576'. 04:00 - 05:00 1.00 FISH P DECOMP M / U Top Drive and Engaged Pump. Established Parameters: String Weight Up 225,000#, String Weight Down 162,000#, String Weight Rotating 188,000#. Pump Rate 5 bpm, 850 psi. Washed Down from 13,576' to 13,720'. Washed Down to the Top of Fish at 13,720'. 05:00 - 06:30 1.50 FISH P DECOMP Burned and Washed overTop of Fish from 13,720' to 13,722'. Pump Rate 3 bpm, 200 psi, RPM 30, Torque 10,000 ft /Ibs, WOM 2,000#. Note: Bottom of Cut Joint Flared Out, Suspect Top of Fish Flared Out Similar. 06:30 - 07:00 0.50 FISH P DECOMP Swallowed Fish in Overshot, Pump Pressure Increased to 250 psi. Shut Down Pump and Fully Engaged Fish at 13,730' w/ 25,000# of Overpull. Rotated Drill String to the Right 8 times. Lost Drill String Torque. P / U on Drill String w/5,000# Drag. 07:00 - 08:00 1.00 FISH P DECOMP Circulated Bottoms Up. Pump Rate 6 bpm, 800 psi. Circulated back 50 bbls Hi-Vis Baracarb Pill. Flow Checked Well, Well Printed: 11/4/2002 2:21 :12 PM .) BP EXPLORATION Operations Summary Report Page 5öf 20 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: W-38A W-38A REENTER+COMPLETE DOYON DOYON 14 Start: 9/30/2002 Rig Release: 10/31/2002 Rig Number: 14 Spud Date: 6/10/1988 End: 10/31/2002 Date From - To Hours Task Code NPT Phase Descri ption. of Operations 10/4/2002 07:00 - 08:00 1.00 FISH P DECOMP Static. 08:00 - 12:00 4.00 FISH P DECOMP POOH wi 4" DP from 13,730' to 950'. 12:00 - 14:30 2.50 FISH P DECOMP POOH wi Fishing BHA. Broke out and LID Fish. Recovered 16' Cut Tubing Jt and 8.4' of Pup Jt. above GLM #6. Pup Jt Twisted off at Collapsed Section of Tubing. 14:30 - 15:30 1.00 FISH P DECOMP Serviced Rig and Top Drive. 15:30 - 17:30 2.00 FISH P DECOMP Mobilized Wash Over Pipe and Milling Tools. 17:30 - 20:30 3.00 FISH P DECOMP Held PJSM. M I U Washover Milling BHA. 8-1/2" Burn Shoe - 2 Jts Wash Pipe - Drive Sub - XO - 2 x Boot Baskets - XO - Bumper Sub - 9 x 6-3/4" D.C. - 6-1/4" Oil Jars - XO - 21 x 4" HWDP. BHA Length 1,028.50'. 20:30 - 00:00 3.50 FISH P DECOMP RIH wi Washover Milling BHA on 4" DP to 11,000' 10/5/2002 00:00 - 01 :00 1.00 FISH P DECOMP Held PJSM. RIH wi Washover-Milling BHA on 4" DP to 13,730'. 01 :00 - 02:30 1.50 FISH P DECOMP M I U Top Drive and Engaged Pump. Checked Parameters: String Weight Up 225,000#, String Weight Down 157,000#, String Weight Rotating 190,000#. RPM 45, Torque 8, 000 ft I Ibs, RPM 65, Torque 11,000 ft I Ibs, RPM 100, Torque 12,000 ft I Ibs. Pump Rate 6 bpm, 975 psi. Washed Down to the Top of Fish at 13,739'. Encountered Excessive Torque and Stalled Rotary Several Times while Washing Down to Top of Fish. Pumped 40 bbl Lube Pill for Lubricity. 02:30 - 07:00 4.50 FISH P DECOMP Milled over Junk, Tubing Stub and GLM from 13,739' to 13,747'. WOM 10,000# -15,000#, RPM 100, Torque 15,000 ft I Ibs, Pump Rate 6 bpm, 1,075 psi. 07:00 - 18:00 11.00 FISH P DECOMP Rotary Stalled, P I U on Drill String, Could not get back over Fish with Wash Pipe. Worked Drill String at Various RPM's and Pump Rates. Indication of Junk in the Hole Preventing Engagement ofFish wi Wash Pipe. Continued to Work Drill String and Mill on Junk. Successfully Milled up Junk and Re-engaged over Fish wi Burn Shoe and Wash Pipe. 18:00 - 00:00 6.00 FISH P DECOMP Milled GLM wi Burn-Over Shoe on Wash Pipe from 13,747' to 13,751'. WOM 15,000# - 25,000#, RPM 130, Torque 8,000- 17,000 ft /Ibs, Pump Rate 5 bpm, 650 psi. Pumped Periodic 10 bbl Hi-Vis Sweeps to Clean the Hole. 10/6/2002 00:00 - 04:00 4.00 FISH P DECOMP Held PJSM. Milled GLM wi Burn-Over Shoe on Wash Pipe from 13,751' to 13,753'. WOM 15,000# - 30,000#, RPM 130, Torque 8,000 - 17,000 ft I Ibs, Pump Rate 5 bpm, 650 psi. Pumped Periodic 10 bbl Hi-Vis Sweeps to Clean the Hole. 04:00 - 05:00 1.00 FISH P DECOMP Held PJSM. Slipped and Cut Drilling Line. 05:00 - 09:30 4.50 FISH P DECOMP POOH wi 4" DP from 13,753' to 1,028'. 09:30 - 11 :00 1.50 FISH P DECOMP POOH wi Washover Milling BHA. Left 4' of Washover Pipe and 4.06' Burn Shoe in Hole. Second Joint of Wash Pipe had cracked Box. 11:00 - 12:00 1.00 FISH P DECOMP Cleaned and Cleared Rig Floor. 12:00 - 14:00 2.00 FISH P DECOMP Held PJSM. Mobilized New Joints of Wash Pipe from Baker's Yard. Pulled and Checked Wear Bushing. Bled OA from 300 psi to 120 psi. Ran and Set Wear Bushing. Brought BHA components to Rig Floor and Strapped same. 14:00 - 15:30 1.50 FISH N DPRB DECOMP Held PJSM. M I U Wash over Milling BHA. 8-1/2" Burn Shoe - 1 Jt Wash Pipe - Drive Sub - XO - 3 x Boot Baskets - XO - Bumper Sub - 6-1/4" Oil Jars - 8 x 6-3/4" D.C. - XO - 21 x 4" HWDP. BHA Length 964.18'. 15:30 - 19:30 4.00 FISH N DPRB DECOMP RIH wi Washover Milling BHA on 4" DP to 13,730' Printed: 11/4/2002 2:21 :12 PM ) ~I ) BP EXPLORATION QþerationsSummary Report Page 6 Of 20 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: W-38A W-38A REENTER+COMPLETE DOYON DOYON 14 Start: 9/30/2002 Rig Release: 10/31/2002 Rig Number: 14 Spud Date: 6/10/1988 End: 10/31/2002 Date From -To Hours Task Code NPT Phase Description of Operations 1 0/6/2002 19:30 - 20:00 0.50 FISH N DPRB DECOMP M I U Top Drive and Engaged Pump. Checked Parameters: String Weight Up 225,000#, String Weight Down 152,000#, String Weight Rotating 190,000#. RPM 50, Torque 5, 000 - 6,000 ft Ilbs, RPM 70, Torque 6,000 - 7,000 ft Ilbs, RPM 90, Torque 7,000 - 8,000 ft Ilbs. Pump Rate 5.5 bpm, 780 psi. Washed Down to and Tagged Top of Fish at 13,743'. 20:00 - 00:00 4.00 FISH N DPRB DECOMP Milled from 13,743' to 13,747'. WOM 2,000# - 3,000#, RPM 70, Torque 16,000 - 19,000 ft Ilbs, Pump Rate 5.5 bpm, 800 psi. Pumped 20 bbl Hi-Vis Sweeps every Two Hours. 10/7/2002 00:00 - 02:30 2.50 FISH N DPRB DECOMP Held PJSM. Milled from 13,747' to 13,748.5'. WOM 2,000#- 3,000#, RPM 70, Torque 15,000 - 18,500 ft Ilbs, Pump Rate 6 bpm, 820 psi. Pumped 30 bbl Hi-Vis Sweeps every Two Hours. 02:30 - 03:30 1.00 FISH N DPRB DECOMP R I U to Reverse Circulate. Reverse Circulated Bottoms up, Pump Rate 4 bpm, 400 psi. Did Not Circulate back Any Significant Amount of Cuttings. Kept Pressure at or below 400 psi, Due to Baracarb Pill Squeeze Maximum Pressure 350 psi. 03:30 - 10:00 6.50 FISH N DPRB DECOMP Milled from 13,748.5' to 13,750'. WOM 2,000# - 5,000#, RPM 70, Torque 15,000 - 18,500 ft Ilbs, Pump Rate 7.5 bpm, 1,200 psi. Pumped 30 bbl Hi-Vis Sweeps every Two Hours. Sweeps consisted of 2.25 # I bbl of Barazan. Prior to POOH, Pumped Back to Back 30 bbl3# I bbl Barazan, 10# I bbl Walnut Hulls Sweeps. 10:00 - 14:00 4.00 FISH N DPRB DECOMP Held PJSM. POOH wI 4" DP from 13,750' to 960'. 14:00 - 16:00 2.00 FISH N DPRB DECOMP POOH wI Washover Milling BHA. 80% Wear on Mill Shoe. Cleaned out Junk Baskets, Cleaned off Ditch Magnets. Recovered 52# Metal Cuttings from Ditch Magnets. Recovered apx 2-1/2 gallons Finely Ground Metal Shaving and Numerous Larger Pieces up to 1" square from Junk Baskets. 16:00 - 18:00 2.00 FISH N DPRB DECOMP Held PJSM. M I U Washover Milling BHA #4.8-1/2" Burn Shoe - 1 Jt Wash Pipe - Drive Sub - XO - 3 x Boot Baskets - XO - Bumper Sub - 6-1/4" Oil Jars - 8 x 6-3/4" D.C. - XO - 21 x 4" HWDP. BHA Length 964.84'. 18:00 - 19:00 1.00 FISH N DPRB DECOMP Held PJSM. Slipped and Cut Drilling Line. 19:00 - 22:30 3.50 FISH N DPRB DECOMP RIH wI Washover Milling BHA on 4" DP to 13,700' 22:30 - 00:00 1.50 FISH N DPRB DECOMP M I U Top Drive and Engaged Pump. Checked Parameters: String Weight Up 235,000#, String Weight Down 145,000#, String Weight Rotating 185,000#. RPM 50, Torque 5,500- 6,000 ft Ilbs, RPM 70, Torque 6,000 - 7,000 ft Ilbs, RPM 90, Torque 7,000 - 8,000 ft Ilbs. Pump Rate 6 bpm, 600 psi. Washed Down Tagged Up Hard at 13,742'. Could Not Get Over Fish. Encountered 15,000 - 20,000# Drag, Drill String Stalled Out. Reciprocated and Rotated Drill String to Assist in Hole Cleaning. Prepared 100 bbl Hi-Vis Sweep. 10/8/2002 00:00 - 02:00 2.00 FISH N DPRB DECOMP Held PJSM. Pumped and Circulated around 100 bbl 250 Vis, 10#1 bbl Barafiber Sweep. Pump Rate 10 bpm, 1,450 psi. Rotated Drill String 130 RPM, Reciprocated Drill String 100' / minute. Circulated Back some Sand and Small Metal Cuttings with Sweep. 02:00 - 12:30 10.50 FISH N DPRB DECaMP Milled over Fish from 13,472' to 13,746.5', Could Not get any deeper. WOM 2,000# - 20,000#. RPM 70 - 100, Torque 15,000 - 19,000 ft Ilbs. Pump Rate 7 bpm, 700 psi. No Progress made Printed: 1114/2002 2:21: 12 PM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: ) ) BP EXPLORATION Operation$ Summary Report W-38A W-38A REENTER+COMPLETE DOYON DOYON 14 Date From - To Hours Task Code .NPT Phase 10/8/2002 02:00 - 12:30 10.50 FISH N DPRB DECOMP 12:30 - 13:00 0.50 FISH N DPRB DECOMP 13:00 - 18:30 5.50 FISH N DPRB DECOMP 18:30 - 19:30 1.00 FISH N DPRB DECOMP 19:30 - 20:00 0.50 BOPSUR P DECOMP 20:00 - 00:00 4.00 BOPSUR P DECOMP 10/9/2002 00:00 - 00:30 00:30 - 01 :30 01 :30 - 04:30 04:30 - 05:30 05:30 - 06:30 06:30 - 07:30 07:30 - 08:00 08:00 - 08:30 08:30 - 12:00 0.50 BOPSUR P DECOMP 1.00 CLEAN N DPRB DECOMP 3.00 CLEAN N 1.00 FISH N DPRB DECOMP DPRB DECOMP 1.00 FISH N DPRB DECOMP 1.00 FISH N DPRB DECOMP 0.50 FISH 0.50 FISH 3.50 FISH P N N DECOMP RREP DECOMP DPRB DECOMP Page 7 of 20 Start: 9/30/2002 Rig Release: 10/31/2002 Rig Number: 14 Spud Date: 6/10/1988 End: 10/31/2002 Description of Operations below 13,7466.5'. Held PJSM. Circulated to Condition the Hole. Pump Rate 7 bpm, 700 psi. POOH wi 4" DP from 13,746' to 945'. Flow Checked Well, Well Static. POOH wI Washover Milling BHA. Left Mill Shoe, 4.06' and 7' of Wash Pipe in Hole. Wash Pipe Parted 7' above Mill Shoe Connection. Pulled Wear Bushing. R I U Test Joint and Equipment to Pressure Test BOPE. Held PJSM. Tested BOPE. Tested Upper and Lower Rams, Blind Rams, Stand Pipe Manifold, Choke Manifold, Valves, HeR, Kill Line, Choke Line, Floor Valves and IBOP to 4,000 psi High I 250 psi Low. Tested Annular Preventer to 2,500 psi High 1250 psi Low. All Tests Held fl 5 Min. All Pressure Tests Held wi No Leaks or Pressure Loss. Witnessing of BOPE test Waived by AOGCC Rep John Crisp. Held PJSM. RID BOPE Test Equipment. Ran and Set Wear Bushing. Held PJSM. M I U Cleanout BHA. Bullnose - 8-1/2" Upper Mill- XO - 9-5/8" Casing Scraper - 3 x Boot Baskets - XO - Bumper Sub - 6-1/4" Oil Jars - 8 x 6-3/4" D.C. - XO - 21 x 4" HWDP. BHA Length 941.02'. RIH wi Cleanout BHA on 4" DP to 9,913'. Tagged Up at 9,913'. M I U Top Drive and Engaged Mud Pump. Pump Rate 5 bpm, 450 psi. RPM 50. Washed and Reamed Mill and Casing Scraper Through 9,900' - 9,930'. Began wi 10,000# Set Down Weight to Work through 9,913'. Finished wi less than 1,000# Set Down Weight Through 9,913'. Picked up on Drill String and Shut Down Rotary. Worked Tools Through 9,913' wi 5,000# Drag. Started Rotary and Worked Tools back Through 9,900' - 9,930'. No Drag in Rotary Mode. Shut Down Rotary. Worked Tools Through 9,913' wi 1,000# Drag. RIH wi Cleanout BHA on 4" DP to 12,233'. Set Down wi 60,000# at 12,233'. M I U Top Drive and Engaged Mud Pump. Pump Rate 7 bpm, 900 psi. RPM 60. Washed and Reamed Mill and Casing Scraper from 12,233' -12,915',7 stands of 4" DP. Rotated and Reciprocated Each Stand. Started Each Stand wi an Average of 20,000# Set Down Weight and Finished wi less than 1,000# Set Down Weight in both Rotary and Non-Rotary Mode Prior to Running Next Stand. Serviced Rig. Repaired Top Drive System. Washed and Pushed Junk Ahead of Mill and Casing Scraper from 12,915' -13,088'. Staged Pump Rate up from 11 bpm, 1,590 psi, to 17 bpm, 3,490 psi, No Losses. RPM 100, Off Bottom Torque 10,000 ft I Ibs, On Bottom Torque 18,000- 20,000 ft I Ibs. Pumped and Circulated around 50 bbl 250 vis, 10# I bbl Barafiber Sweep. Circulated back Metal Shavings and Small Amount of 1/2" - 3/4" Size Metal Pieces. Started wi 10,000# Set Down Weight at 12,915', Pushed Junk Ahead of Mill at 13,088' wi 10,000# Set Down Weight. Decision made to Printed: 11/4/2002 2:21: 12 PM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date » ) Page 8 of 20 BP EXPLORATION Operations Summary Report W-38A W-38A REENTER+COMPLETE DOYON DOYON 14 From-To Hours Task Code NPT Phase 10/9/2002 08:30 - 12:00 3.50 FISH N 12:00 - 13:30 1.50 FISH N 13:30 - 20:30 7.00 FISH N 20:30 - 22:30 2.00 FISH N 22:30 - 23:00 0.50 FISH N 23:00 - 00:00 1.00 FISH N 10/10/2002 00:00 - 01 :00 1.00 FISH N 01 :00 - 03:00 2.00 FISH N 03:00 - 07:00 4.00 FISH N 07:00 - 15:00 8.00 FISH N 15:00 - 17:30 2.50 FISH N 17:30 - 18:30 1.00 FISH N 18:30 - 22:00 22:00 - 00:00 10/11/2002 00:00-01:00 3.50 FISH 2.00 FISH 1.00 CLEAN C DPRB DECOMP DPRB DECOMP DPRB DECOMP DPRB DECOMP DPRB DECOMP DPRB DECOMP DPRB DECOMP DPRB DECOMP DPRB DECOMP RREP DECaMP DPRB DECOMP DPRB DECOMP N DPRB DECaMP N DPRB DECOMP Start: 9/30/2002 Rig Release: 10/31/2002 Rig Number: 14 Spud Date: 6/10/1988 End: 10/31/2002 Description of Opërations POOH and P / U Junk Mill. Held PJSM. Slipped and Cut Drilling Line. POOH L / D 414 Joints of 4" DP. POOH L / D Clean Out BHA. Cleaned Out Junk Baskets, Recovered 1/2 Gallon Metal Shavings. Cleared Rig Floor of Equipment. Brought Junk Mill to Rig Floor. Held PJSM. M / U Junk Mill BHA. 8-1/2" Junk Mill- XO - 8-1/2" Upper Mill - XO - 3 x Boot Baskets - XO - Bumper Sub - 6-1/4" Oil Jars - 8 x 6-3/4" D.C. Held PJSM. P / U 19 Joints of 5" HWDP. Held PJSM. Changed Out HT 38 Saver Sub f/ 4-1/2" IF Saver Sub. RIH w/ Junk Mill BHA, P / U 5" Drill Pipe to 6,600' Repaired Pipe Skate. Broken Shaft on Drum. RIH w/ Junk Mill BHA, P / U 5" Drill Pipe to 9,900'. Tagged up w/ 15,000# Set Down Weight at 9,900'. Worked Drill String from 9,900' - 9,920', OverpuIl10,000#, Drag 10,000#. M / U Top Drive and Engaged Mud Pumps. RPM 130, Torque Off Bottom 8,000 ft / Ibs, Pump Rate 9.5 bbls, 550 psi. Worked Mills Several Times Through the Section from 9,900'- 9,920' to Dress Off. On Bottom Torque 15,000 - 18,000 ft / Ibs. After Several Passes Torque was Reduced to 10,000 ft / Ibs. Shut Down Rotary and Mud Pumps and Worked Mills from 9,900' - 9,920'. Overpullless than 1,000#, Drag +/- 1,000#. RIH w/ Junk Mill BHA, P / U 5" Drill Pipe to 13,022'. Worked Through Slight Drag at 10,430' and 12,917'. Washed, Reamed and Milled on Junk from 13,022' to 13,309'. Pump Rate 720 gpm, 1,550 psi, RPM 90, Off Bottom Torque 10,000 ft / Ibs, String Weight Up 260,000#, String Weight Down 185,000#, String Weight Rotating 217,000#. Observed the Following: Depth Set Dwn Wght Torque 13,022' 1,000# 11,000 - 12,000 13,060' 10,000# 19,000 - 20,000 13,088' 8,000# 20,000 - 24,000 13,100' 10,000# 14,000 -15,000 13,160' 3,000# 19,000 - 23,000 13,180' 0# 15,000 -18,000 13,190' 2,000# 20,000 - 23,000 13,213' 0# 17,000 - 19,000 13,309' 0# 16,000 - 18,000 Did not Appear to be Pushing any Junk or Encounter any Set Down Weight w/ Mill from 13,200' - 13,309'. Pumped 35 bbl 250 Vis 10# / bbl Barafiber Sweep at 13,022'. Circulated back Fair Show of Metal Cuttings w/ Sweep. DECOMP Held PJSM. Washed Down from 13,309' to 13,596'. Pump Rate 720 gpm, 1,550 psi, RPM 90, Off Bottom Torque 10,000 ft Printed: 111412002 2:21:12 PM ) ) BP EXPLORATION Operations. Summary. Report Page 9 of 20 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: W-38A W-38A REENTER+COMPLETE DOYON DOYON 14 Start: 9/30/2002 Rig Release: 10/31/2002 Rig Number: 14 Spud Date: 6/10/1988 End: 10/31/2002 Date From -To Hours Task Code NPT Phase Descri ptiönof Operations 10/11/2002 00:00 - 01 :00 1.00 CLEAN C DECOMP / Ibs, String Weight Up 260,000#, String Weight Down 185,000#, String Weight Rotating 217,000#. Observed the Following: Depth Set Dwn Wght Torque 13,400' 0# 10,000 - 12,000 13,500' 0# 10,000 - 12,000 13,596' 0# 10,000 - 12,000 01:00 - 03:00 2.00 CLEAN C DECOMP Pumped and Circulated Around 50 bbl250 Vis 10# / bbl Barafiber - 20 bbl Seawater - 50 bbl 250 Vis 10# / bbl Barafiber Combination Sweep. Pump Rate 720 gpm, 1,550 psi, Rotated Drill String 130 RPM, Reciprocated Drill Pipe 180' / Minute. Followed First Sweep w/ Second 50 bbl 250 Vis 10# / bbl Barafiber Sweep w/ Identical Parameters. Circulated until Returns over Shaker were Clean. Circulated Back Good Show of Metal Cuttings. 03:00 - 04:00 1.00 CLEAN C DECOMP Held PJSM.Slipped and Cut Drilling Line. Continued to Circulate During Slip and Cut Operation, Pump Rate 720 gpm, 1,550 psi. 04:00 - 09:00 5.00 CLEAN C DECOMP POOH w/ 5" DP to 965'. Tools Encountered Drag @ 13,150'- 13,130',13,105' -13,062', and 9,920' - 9,890'. 09:00 - 10:00 1.00 CLEAN C DECOMP POOH, Broke Out and L / D BHA. Cleaned Out Junk Baskets, Recovered Less than 1# of Metal Cuttings. 10:00- 11 :30 1.50 CLEAN C DECOMP Held PJSM. Pulled Wear Bushing, Ran in Hole w/ 8-1/2" Mill, Mill Hung up in Top of 9-5/8" Casing. Dressed off Top of 9-5/8" Casing for f/ Smooth Entry of Whipstock. Pulled Mill, Ran and Set Wear Bushing. 11 :30 - 12:30 1.00 CLEAN C WEXIT Held PJSM. R / U Schlumberger Equipment f/ Gauge Ring, Junk Basket, Plug Setting Runs. 12:30 - 15:00 2.50 CLEAN C WEXIT RIH w/ CCL - Junk Basket - 8.5" Gåuge Ring on E-Line. Tagged up at 9,842', could not Work Through, POOH. Recovered Less than 1/2 Cup of Metal Cuttings. 15:00 - 18:00 3.00 CLEAN C WEXIT Changed out to an 8.375" Gauge Ring. RIH w/ CCL - Junk Basket - 8.375" Gauge Ring on E-Line to 13,700'. POOH, Recovered 1 Cup of Metal Cuttings from CCL and Junk Basket. 18:00 - 20:30 2.50 CLEAN C WEXIT RIH wI CCL - Junk Basket - 8.375" Gauge Ring on E-Line to 13,500'. POOH, Recovered Less Than 1/4 Cup Metal Cuttings from CCL, No Cuttings in Junk Basket. 20:30 - 23:30 3.00 EVAL C WEXIT M / U GR to Tool String, RIH w/ CCL - GR - Junk Basket - 8.375" Gauge Ring on E-Line to 13,550'. Made CCL - GR Logging Pass from 13,500' to 13,100'. POOH, No Metal Cuttings Recovered. 23:30 - 00:00 0.50 STWHIP C WEXIT Broke off and L / D Junk Basket. M / U Halliburton 9-5/8" EZSV Packer to E-Line Tool String. 10/12/2002 00:00 - 00:30 0.50 STWHIP C WEXIT Held PJSM. M / U Halliburton 9-5/8" EZSV Packer to E-Line Tool String. RIH w/ 9-5/8" EZSV Packer to 13,450'. Pulled Up Hole and Correlated to CCL - GR Log. Set 9-5/8" EZSV Packer at 13,376', E- Line Measurements. Waited 5 Minutes, Pulled up Hole 100', Slowly Ran in Hole Stacked out on Packer at 00:30 - 02:30 2.00 STWHIP C WEXIT Printed: 11/4/2002 2:21: 12 PM ) BP EXPLORATION Operations Summary Report Page.10 of20 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: W-38A W-38A REENTER+COMPLETE DOYON DOYON 14 Start: 9/30/2002 Rig Release: 10/31/2002 Rig Number: 14 Spud Date: 6/10/1988 End: 10/31/2002 Date From,.. To Hours Task Code NPT Phase Description of Operations 10/12/2002 00:30 - 02:30 2.00 STWHIP C WEXIT 13,376'. Packer in Place at 0215 hrs. 02:30 - 04:00 1.50 STWHIP C WEXIT Held PJSM. POOH wi CCL-GR on E-Line. RID Schlumberger Equipment. 04:00 - 05:00 1.00 WHSUR C WEXIT Held PJSM. M I U Retrieving Tool and Pulled Wear Bushing. M I U Packoff Retrieving Tool on Joint of Drill Pipe, RIH and Latched Packoff. ROLDS. Pulled Packoff, Junk Ring on Bottom of Packoff Sheared. Junk Ring Left in Packoff Profile. LID Packoff Retrieving Tool. 05:00 - 06:00 1.00 WHSUR C WEXIT Held PJSM. RIH wi Drill Collars, HWDP and RTTS wi Storm Valve, Set RTTS at 50'. Unlatched from RTTS, POOH. 06:00 - 07:00 1.00 BOPSUR C WEXIT Held PJSM. N / D BOP Stack. 07:00 - 07:30 0.50 WHSUR C WEXIT Removed Old Sheared Off Junk Ring, Cleaned and Prepped Bowl. 07:30 - 08:00 0.50 BOPSUR C WEXIT N I U BOP Stack. 08:00 - 08:30 0.50 WHSUR C WEXIT M I U Tool, Ran and Installed New Packoff. 08:30 - 09:00 0.50 WHSUR C WEXIT RILDS, Attempted to Test New Packoff. Packoff would not Hold. Packoff not Set Properly. 09:00 - 09:30 0.50 WHSUR C WEXIT Held PJSM. M I U Packoff Retrieving Tool on Joint of Drill Pipe, RIH and Latched Packoff. ROLDS. Pulled Packoff, Junk Ring on Bottom of Packoff Sheared. Junk Ring Left in Packoff Profile. LID Packoff Retrieving Tool. 09:30 - 10:30 1.00 BOPSUR C WEXIT N I D BOP Stack and Tubing Spool. 10:30 - 11 :00 0.50 WHSUR C WEXIT Removed Junk Ring, Cleaned and Prepped Bowl, Installed New Packoff. 11 :00 - 13:00 2.00 BOPSUR C WEXIT Held PJSM. N I U BOP Stack and Tubing Spool. 13:00 - 13:30 0.50 WHSUR C WEXIT Tested Packoff to 5,000 psi fl 10 minutes, OK. Body Tested BOP Stack and Flange to 3,500 psi, OK. 13:30 - 14:30 1.00 WHSUR C WEXIT Held PJSM. RIH, Latched into RTTS, Released RTTS. POOH, Broke out and LID RTTS. POOH wi HWDP and Drill Collars. 14:30 - 15:00 0.50 BOPSUR C WEXIT M I U Tool, Ran and Set Wear Bushing. 15:00 - 15:30 0.50 CASE C WEXIT Held PJSM. Closed Blind Rams, Tested 9-5/8" Casing to 3,500 psi fl 30 minutes, OK. Bled Down Pressure, Opened Blind Rams. Monitored OA during Casing Test, OA 0 psi. 15:30 - 17:30 2.00 STWHIP C WEXIT Held PJSM. M I U Whipstock BHA: Whipstock - 8" Starting Mill - 8" Lower Mill - 1 Joint 5" HWDP - Float Sub - MWD - UBHO - Bumper Sub - 8 x 6-3/4" Drill Collars - 19 x 5" HWDP. BHA Length 911.43'. 17:30 - 18:00 0.50 STWHIP C WEXIT M I U Top Drive, Tested MWD, 400 gpm, 500 psi, OK. 18:00 - 00:00 6.00 STWHIP C WEXIT RIH wi Whipstock BHA on 5" DP to 10,832'. Tripping Speed 1-1/2 - 2 Minutes I Stand. 10/13/2002 00:00 - 01 :30 1.50 STWHIPC WEXIT Held PJSM. RIH wi Whipstock BHA on 5" DP to 13,330'. Tripping Speed 1-1/2 - 2 Minutes I Stand. 01 :30 - 02:30 1.00 STWHIP C WEXIT M I U Top Drive, Engaged Pumps, Established Parameters: Pump Rate 400 gpm, 1,100 psi, String Weight Up 265,000#, String Weight Down 190,000#. Oriented Whipstock 60 deg Right and RIH very slowly, Tagged Up at 13,362' Drill Pipe Measurements. Set Down wi 25,000# and Set Whipstock Anchor. Pulled Up to 10,000# Overpull to Confirm Anchor Set. Set Down wi 40,000# and Sheared off of Whipstock. Pulled up and Confirmed Whipstock is Set and Sheared. 02:30 - 04:30 2.00 STWHIP C WEXIT Held PJSM wi Peak Drivers and Rig Crew. Displaced to 11.2 Printed: 11/4/2002 2:21 :12 PM ) ) BP EXPLORATION Operations Summary. Report Page 11 of 20 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: W-38A W-38A REENTER+COMPLETE DOYON DOYON 14 Start: 9/30/2002 Rig Release: 10/31/2002 Rig Number: 14 Spud Date: 6/10/1988 End: 10/31/2002 Date From - To Hours Task Code NPT Phase Description of Oþerations 1 0/13/2002 02:30 - 04:30 2.00 STWHIP C WEXIT ppg LSND Mud. Pump Rate 450 gpm, 1,900 psi. Circulated Mud System 1 Full Circulation, 11.2 ppg - In, 11.2 ppg - Out. 04:30 - 12:00 7.50 STWHIP C WEXIT Milled Window from 13,339' to 13,367'. WOM 4,000#- 25,000#, RPM 70 - 100, Torque Off Bottom 10,000 ft / Ibs, Torque On Bottom 12,000 - 15,000 ft / Ibs, Pump Rate 450 gpm, 1,900 psi. Pumped 30 bbl Hi-Vis Sweeps Every Hour. Note: Top of Window 13,339' / Bottom of Window 13,355'. Drilled New Hole 13,355' to 13,367'. ~ 12:00 - 13:00 1.00 STWHIPC WEXIT Held PJSM. Pumped and Circulated Around 50 bbl Hi-Vis Sweep. Pump Rate 450 gpm, 2,200 psi. Circulated until Returns Over Shakers were Clean. Note: Recovered 45# of Metal Cuttings. 13:00 - 14:00 1.00 DRILL C WEXIT Held PJSM. Closed Pipe Rams and Performed FIT. Strokes Pmp'd Pressure 2 130 psi 4 180 psi 6 250 psi 8 300 psi 10 370 psi 12 440 psi 14 510 psi 16 580 psi 18 650 psi 20 710 psi MW 11.2 ppg, WindowTVD 8,312', Pressure 710 psi = 12.82 ppg EMW. Held Pressure f/ 10 minutes, Pressure Leaked off from 710 psi to 660 psi in 5 minutes. Pressure at 10 minutes 660 psi. Bled down Pressure, Opened Pipe Rams. 14:00-18:30 4.50 DRILL C WEXIT Flow Checked Well, Well Static. POOH wI 5" DP to 911'. Calculated Fill = 92.9 bbls, Actual Fill = 95.75 bbls. 18:30 -19:30 1.00 DRILL C WEXIT POOH w/ BHA. Broke out and L / D MWD, UBHO and Lower Mill. 19:30 - 20:30 1.00 STWHIP C WEXIT Held PJSM. M / U Window Milling BHA: 8" Starting Mill - XO - 8-1/2" Upper Mill - 1 Joint 5" HWDP - Float Sub - Bumper Sub - 8 x 6-3/4" Drill Collars - 19 x 5" HWDP. BHA Length 866.04'. 20:30 - 23:00 2.50 STWHIP C WEXIT RIH w/ Milling BHA on 5" DP to 8,528'. 23:00 - 00:00 1.00 STWHIP C WEXIT Held PJSM. Slipped and Cut Drilling Line. 10/14/2002 00:00 - 00:30 0.50 STWHIP C WEXIT Held PJSM. Finished Slipping and Cutting Drilling Line. 00:30 - 02:00 1.50 STWHIPC WEXIT RIH w/ Milling BHA on 5" DP to 13,325'. 02:00 - 03:30 1.50 STWHIP C WEXIT M / U Top Drive, Established Parameters: Pump Rate 450 gpm, 1,750 psi, String Weight Up 240,000#, String Weight Down 175,000#, String Weight Rotating 207,000#, RPM 100, Torque Off Bottom 10,000 ft / Ibs. Dressed Out Window w/ 8-1/2" Upper Mill from 13,339' to 13,367'. WOM 3,000#- 10,000#, RPM 100, Torque On Bottom 12,000 - 16,000 ft / Ibs, Pump Rate 450 gpm, 1,750 psi. Pumped 50 bbl Hi-Vis Sweep. 03:30 - 05:30 2.00 STWHIP C WEXIT Pumped and Circulated Around 30 bbl Hi-Vis Barafiber Sweep. Pump Rate 650 gpm, 2,850 psi. Circulated until Returns Over Shaker were Clean. Flow Checked Well, Well Static. 05:30 - 10:30 5.00 STWHIP C WEXIT Held PJSM. POOH w/ 5" DP from 13,367' to 911', SLM. Calculated Fill = 92.9 bbls, Actual Fill = 96.5 bbls. 10:30 - 12:00 1.50 STWHIP C WEXIT POOH w/ BHA, Stood 5" HWDP in Derrick, Broke Out and L / Printed: 11/4/2002 2:21:12 PM ) ) BP EXPLORATION Operations Summary Report Page 12 . of 20 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: W-38A W-38A REENTER+COMPLETE DOYON DOYON 14 Start: 9/30/2002 Rig Release: 10/31/2002 Rig Number: 14 Spud Date: 6/10/1988 End: 10/31/2002 Date From -To Hours Task Code NPT Phase Description of Operations 10/14/2002 10:30 - 12:00 1.50 STWHIP C WEXIT D Drill Collars and Remaining BHA. Gauged Mill, In Gauge. 12:00 - 12:30 0.50 STWHIP C WEXIT Held PJSM. Cleared the Rig Floor of All BHA components. 12:30 - 13:00 0.50 BOPSURC INT1 M I U Stack Washer, Washed and Jetted BOP Stack. 13:00 -14:00 1.00 BOPSURC INT1 M I U Retrieving Tool, Pulled Wear Bushing. R I U Equipment to Test BOPE. 14:00 - 20:00 6.00 BOPSURC INT1 Held PJSM. Tested BOPE. Tested Upper and Lower Rams, Blind Rams, Stand Pipe Manifold, Choke Manifold, Valves, HCR, Kill Line, Choke Line, Floor Valves and IBOP to 3,500 psi High 1250 psi Low. Tested Annular Preventer to 2,500 psi High 1250 psi Low. All Tests Held f/5 Min. All Pressure Tests Held wi No Leaks or Pressure Loss. Witnessing of BOPE test Waived by AOGCC Rep Jeff Jones. Note: Valve #2 on Choke Manifold would not Test Initially. Replaced Valve #2 on Choke Manifold, Tested to 3,500 psi High 1250 psi Low, Both Tests Held for 5 Min wi No Leaks or Pressure Loss. 20:00 - 20:30 0.50 BOPSUR C INT1 RID BOPE Test Equipment. M I U Retrieving Tool, Ran and Set Wear Bushing. 20:30 - 23:00 2.50 DRILL C INT1 Held PJSM. M I U BHA: 8-1/2" STC S73EHPX PDC Bit, Ser# JS2697, dressed wi 8x12 jets, 7" SperryDrill Lobe 7/8 6.0 stg Motor wi 1.50 deg Bent Housing, Integral Blade Stabilizer, Non-Mag Float Sub - MWD GR - MWD PM - Hang Off Sub, 3 x Flex Collars - HE Drilling Jars - 20 Jts 5" HWDP. Total BHA Length - 780.27'. Set Motor Bend and Oriented to MWD. Downloaded Date to MWD. M I U Top Drive and Tested MWD Tools, OK. 23:00 - 00:00 1.00 DRILL C INT1 RIH wi 8-1/2" Directional BHA on 5" DP. 10/15/2002 00:00 - 03:30 3.50 DRILL C INT1 Held PJSM. RIH wi 8-1/2" Directional BHA on 5" DP to 13,290'. 03:30 - 04:00 0.50 DRILL C INT1 Held PJSM. Slipped and Cut Drilling Line. 04:00 - 04:30 0.50 DRILL C INT1 M I U Top Drive. Established Parameters, String Weight Up 235,000#, String Weight Down 170,000#, Pump Rate 500 gpm, 2,500 psi. Oriented Tools to 60 deg Right. Shut Down Pumps and Lower Drilling Assembly Through Window to 13,365', OK. 04:30 - 20:00 15.50 DRILL C INT1 Drilled 8-1/2" Directional Hole from 13,367' to 14035' (7" Csg Pt) ART 3.81 hrs, AST 7.46 hrs. P/U 240k, S/O 170k, ROT 210k. 550 gpm @ 3100 psi on bottom, 2800 psi off bottom. Torq off 10k, Torq on 13k. 70 rpm. 130 spm. 20:00 - 21 :00 1.00 DRILL C INT1 Pump 30 bbl weighted sweep, surface to surface. 21 :00 - 22:00 1.00 DRILL C INT1 Made 8 stand wiper trip up into casing @ 13325'. No excess drag. RIH to bottom. Hole in very good condition. No fill. 22:00 - 00:00 2.00 DRILL C INT1 Circulate & pump 30bbl weight pill surface to surface. Hole clean, no excess cuttings when sweep came around. Circulate & spot 70 bblliner running pill from TD to casing shoe. 10/16/2002 00:00 - 05:00 5.00 DRILL C INT1 Monitor well, Drop 2.25" drift. POOH wi 5" DP. 05:00 - 06:00 1.00 DRILL C INT1 UD HWDP & DCs. 06:00 - 06:30 0.50 DRILL C INT1 Down load MWD data & UD MWD equip. 06:30 - 07:00 0.50 DRILL C INT1 UD motor & bit. Clear rig floor. 07:00 - 08:00 1.00 BOPSUR C INT1 Change top pipe rams to 4 1/2" x 7" VBR. Test to 3000 psi. 08:00 - 08:30 0.50 CASE C INT1 PJSM. R/U liner running equip. 08:30 - 09:30 1.00 CASE C INT1 Run 7" BTC, 26#, L-80 liner as per program. 09:30 - 10:00 0.50 CASE C INT1 M/U hanger & circulate liner volume. Record weights, P/U 70k, SIO 70k. Printed: 11/4/2002 2:21: 12 PM v ) BP EXPLORATION Operations Summary Report Page 13 of20 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: W-38A W-38A REENTER+COMPLETE DOYON DOYON 14 Start: 9/30/2002 Rig Release: 10/31/2002 Rig Number: 14 Spud Date: 6/10/1988 End: 10/31/2002 Date From -To Hou rs Task Code NPT Phase Description of Operations 10/16/2002 10:00 - 17:00 7.00 CASE C INT1 RIH wI liner on 5" DP. Fill every 10 stands to 13285'. (54' above window). 17:00 - 18:00 1.00 CASE C INT1 Circulate DP & liner volume above window @ 13285'. Record wts, P/U 245k, SIO 170k. Record rate and pressures at 15, 30, 45, and 60 SPM. 18:00 - 19:00 1.00 CASE C INT1 Con't RIH wI liner. Hole tight @ 13835'. Attempt to break circulation, hole started to pack off. 19:00 - 22:00 3.00 CASE C INT1 Pull up to 13732' & establish circulating rates & pressures. Attempt to circulate & wash to bottom. Hole started to bridge off. Work pipe could not get deeper than 13916'. Up wts. while circulating at 70 SPM ==250K Down==170. Pressures while attempting to wash down: 50 @ 650---70 @ 950---85 @ 1285. Made several attempts to wash to bottom, with hole packing off. Work with no pump with 70K down. Picking up with 70 to 90 K overpulls. 22:00 - 22:30 0.50 CASE X DPRB INT1 POOH into casing shoe @ 13285' wI 7" liner. Hole taking 40 to 60K overpulls and swabbing. Idle pump at 30 to 40 spm to keep hole full. 22:30 - 00:00 1.50 CASE X DPRB INT1 Circulate bottoms up. Had some bridging problems. Reciprocate pipe. Circulate @ 8 BPM @ 1000 psi. 10/17/2002 00:00 - 00:30 0.50 CASE X DPRB INT1 Circulate bottoms up in casing shoe @ 13285'. 00:30 - 02:30 2.00 CASE X DPRB INT1 POOH. Hole swabbing. M/U top drive & pump out of hole. 02:30 - 03:00 0.50 CASE X DPRB INT1 Circulate bottoms up @ 10989'. 102 SPM, 1200 psi. Small amount of silt over shaker. 03:00 - 04:00 1.00 CASE X DPRB INT1 POOH. Pulled 2 stands 10700' & well started swabbing. 04:00 - 13:00 9.00 CASE X DPRB INT1 Con't to POOH wI top drive & pump out of hole. 13:00 - 13:30 0.50 CASE X DPRB INT1 R/U equip to to lay down 7" liner. Lots of cuttings returned as Packer came close to surface. Circulate at 10 bpm with 3 stands DP left in hole. Packer element rubber seen in cuttings. POH to packer. Packer had set and rubber element was gone. 13:30 - 15:30 2.00 CASE X DPRB INT1 LID 7" liner & shoe track. 15:30 - 16:00 0.50 CASE X DPRB INT1 Clear floor & RID casing tools & equip. 16:00 - 17:00 1.00 CASE X DPRB INT1 M/U clean out BHA with new mill tooth bit, bit sub, and 8 3/8" stab. RIH 17:00 - 18:30 1.50 CASE X DPRB INT1 Cut & slip drilling line. Service top drive. 18:30 - 22:30 4.00 CASE X DPRB INT1 RIH with clean out assy on 5" DP to 13277'. 22:30 - 00:00 1.50 CASE X DPRB INT1 Circulate & condition mud. circulate @ 500 GPM, 1750 psi for 1 st circulation. Pump Hi-Vs weighted sweep from surface to surface @ 550 GPm, 1850 Psi. ROT 90-120 RPMs. Torq 10K. P/U 225K, SIO 200K.. Very minimal amount of cuttings seen at surface with sweep. 10/18/2002 00:00 - 01 :30 1.50 CASE X DPRB INT1 Finish circulating & conditioning hole. Record rates and pressures at several different stations. 01 :30 - 02:00 0.50 CASE X DPRB INT1 Exit window with no adverse hole conditons or fill. RIH by stands, record P/U & SIO wts. M/U top drive on Stand # 139. 02:00 - 05:30 3.50 CASE X DPRB INT1 Break circulation & begin washing & reaming. 110 Stks, !580 Psi, 50 Rpms, Torq 10K. washed down to 13940'. Backed reamed up to 13883', hole started to pack off & pull tight. Work pipe & pull 3 stands. Begin washing and reaming from 13,660 to 14,036. Reaming with 10-15K torque, 550 GPM @ 2100 and 60 RPM. Heavy cavings coming over shaker through out circulation and reaming operation. PU wts. 260 Slack off 175 Printed: 111412002 2:21: 12 PM ) ') j BP EXPLORATION 0 peratio ns8 u mnla..y~eport Page 14 of 20 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: W-38A W-38A REENTER+COMPLETE DOYON DOYON 14 Start: 9/30/2002 Rig Release: 10/31/2002 Rig Number: 14 Spud Date: 6/10/1988 End: 10/31/2002 Date From -To Hours Task Code NPT Phase Description of Operations 10/18/2002 05:30 - 07:00 1.50 CASE X DPRB INT1 Cirulate bottoms up. Heavy cuttings coming over shakers. 550 Gpm, 2050 Psi, 120 Rpms, Torq 13K, P/U 225K, SIO 170K, ROT 210K. 07:00 - 08:30 1.50 CASE X DPRB INT1 Circulate 30 bbl Hi-Vis sweep surface to surface. 550Gpm, 2100 Psi, 120 Rpms, Torq 11.5K. 08:30 - 11 :00 2.50 CASE X DPRB INT1 Circulate 50 bbl Hi-Vis sweep surface to surface. 550 Gpm, 2050 Psi, 120 Rpms, Torq 10.5K. Followed by spike fluid and 2 pds. per bbls. barafibre to bring wt. up to 11.7 ppg. Saw good increase of cuttings with first 25 to 30 bbls. of sweep. Hole cleaned up after sweep was completely out of hole. (App. 1 vis. cup per minute) 11 :00 - 11 :30 0.50 CASE X DPRB INT1 Flow check & POOH to 13300'. 11 :30 - 13:30 2.00 CASE X DPRB INT1 Circulate and condition mud at shoe. No signs of increase of cuttings from casing. Treat mud for water loss and balance wt. to consistant 11.7 ppg.. Parameters:== 550 Gpm, 2020 Psi, 120 Rpms, torq 9K. P/U 230K, SIO 170K, Rot 200K. Obtain Slow pump rates. 13:30 - 14:00 0.50 CASE X DPRB INT1 TIH to bottom @ 14035'. Hole in good condition. 14:00 - 16:30 2.50 CASE X DPRB INT1 Circulate Hi-Vis sweep surface to surface. 550gpm, 2130 Psi,. Spot 60 bbls. liner pill. Some increase of cuttings seen at shakers. 16:30 - 17:00 0.50 CASE X DPRB INT1 Flow check & POOH to 13100' and pump dry job. Observe well for static. 17:00 - 17:30 0.50 CASE X DPRB INT1 Flow check & blow down top drive. 17:30 - 21 :30 4.00 CASE X DPRB INT1 POOH from 13100 to HWDP. 21 :30 - 23:00 1.50 CASE X DPRB INT1 LID BHA & clear floor. Fuction test blind rams. 23:00 - 23:30 0.50 CASE X DPRB INT1 Rig up to run 7" liner. 23:30 - 00:00 0.50 CASE X DPRB INT1 M/U shoe track & Baker lock same. check floats, OK. 10/19/2002 00:00 - 01 :00 1.00 CASE X DPRB INT1 PJSM. M/U & Run 21 jts, 26#, L-80 BTC liner as per program. P/U 70K, SIO 70K. 22,000 liner wt. 01 :00 - 01 :30 0.50 CASE C INT1 M/U hanger & circulate hanger volume. 01 :30 - 08:00 6.50 CASE C INT1 TIH to 13300' on 5" DP. Fill pipe every 10 stands. 08:00 - 08:30 0.50 CASE C INT1 M/U cementing head. P/W 235K, SIO 175K. 08:30 - 09:30 1.00 CASE C INT1 Record pressures @ different circulating rates. Circulate 1 pipe volume. 60 SPM @ 770 Psi. 09:30 - 10:00 0.50 CASE C INT1 RIH to 14035'. Hole in good shape, no adverse hole conditions & no fill. P/U 250K, S/O 175K. 10:00 - 11 :00 1.00 CEMT C INT1 M/U cementing head & break circulation. Stage up pumps from 5 SPM to 85 SPM. Attempt to reciprocate pipe losing approx. 2' hole. Park pipe on bottom & wash down to original TD @ 14035'. Final circulating rate of 85 SPM, 1300 Psi. 11 :00 - 12:30 1.50 CEMT C INT1 Circulate & condition for cementing. Batch mix cement. Held PJSM fl cementing. 12:30 - 14:00 1.50 CEMT C INT1 Cement liner as follows: Pump 5 bbls water & test lines to 4000 Psi. Pump 20 bbls of Mud Push XL. Pump 36 bbls Class 'G' cement @ 15.8 ppg, Yld 1.16 CuFtlSx. Drop top plug & chase wI 5 bbls water. Displace wI rig pumps using 11.7 ppg mud @ 8 BPM. Slowed pumps to 2 BPM, wI 14 bbls left to displace. Bump plug to 3600 Psi, Float held. Set down to confirm liner is set. Apply 20 turns to right and release from liner. Applied 1000 Psi to DP & P/U 3'. Observe pressure loss & pump 10 bbls the long way. P/U 6' & expose dogs. SIO wI 60K several times & set packer. good shear indication. Rotated 5 RPMs & set down Printed: 11/4/2002 2:21:12 PM ,) BP EXPLORATION Operations Summary Report Page.15 of 20 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: W-38A W-38A REENTER+COMPLETE DOYON DOYON 14 Start: 9/30/2002 Rig Release: 10/31/2002 Rig Number: 14 Spud Date: 6/10/1988 End: 10/31/2002 Date From - To Hours Task Code NPT Phase Description of Operations 10/19/2002 12:30 - 14:00 1.50 CEMT C INT1 wI 70K. Pulled 2 singles. 14:00 - 15:30 1.50 CEMT C INT1 Circulate bottoms up the long way. 550 GPM, 1750 Psi, No cement or increase in cuttings to surface. Flow check & pump slug. 15:30 - 16:00 0.50 CEMT C INT1 POH & LID 21 jts. P/U cementing head. Make service breaks. 16:00 - 20:00 4.00 CASE C INT1 Con't POOH fl 12600' to surface. Function blind rams. 20:00 - 20:30 0.50 CASE C INT1 LID liner running tool. 20:30 - 21 :30 1.00 DRILL C PROD1 Clear floor LID all vender equip. P/U & bring up to floor new BHA equip. 21 :30 - 00:00 2.50 DRILL C PROD1 M/U new BHA with tri-cone bit and 1.83 motor. Orient and shallow test MWD/motor. 10/20/2002 00:00 - 01 :00 1.00 DRILL C PROD1 Con't to M/U BHA #3. Finish surface test MWD & Motor. 01 :00 - 02:30 1.50 DRILL C PROD1 P/U 63 jts of 4" DP & RIH 1x1 to 2233'. 02:30 - 06:00 3.50 DRILL C PROD1 RIH wI 5" DP to 13820'. Fill every 2500'. 06:00 - 07:00 1.00 DRILL C PROD1 Cut & slip drilling line. Service rig & top drive. 07:00 - 07:30 0.50 DRILL C PROD1 Wash down & tag cement @ 13860'. Con't to wash & rotate down to Landing collar @ 13948. 07:30 - 08:30 1.00 CASE C PROD1 Test casing to 3500 psi for 30 min. & charted same. tested good. 08:30 - 11 :00 2.50 DRILL C PROD1 Drill out shoe track down to 14030'. 220 Gpm, 1600 Psi, 25 Rpms, Torq 13k. Pump 20 bbl EP Lube pill while drilling last 20' of shoe track to coat casing. 11 :00 - 14:30 3.50 DRILL C PROD1 Pump 70 bbl Hi-vis Barafiber spacer & Displace well to 8.4 ppg Quikdril mud. P/U 250k, S/O 175k, Rot 200k. Torq on 13k, Torq off 10.5k. Displaced @ 275 Gpm, 2700 Psi. Final rate 275 Gpm & 1300 Psi. 14:30 - 15:00 0.50 DRILL C PROD1 Rinse out solids equip. Obtain baseline values fl SPR, ECD drilling parameters. 15:00 - 16:00 1.00 DRILL C PROD1 Finish drilling out last 5' of shoe to 14035'. Drill 20' of new hole to 14055'. Record "clean hole ECD" 8.87 at 40 RPM. 16:00 - 16:30 0.50 DRILL C PROD1 Perform FIT, chart & record same. Test pressure 550 psi. 8.5 test mud wt. @ 8725 TWD=== 9.7 ppg EMW. Function test 4 1/2" x 7" VBR. 16:30 - 00:00 7.50 DRILL C PROD1 Directionaly drill ahead as per plan from 14055 to 14190'. 275 Gpm, 65 Spm, PP 1300 psi off, PP 1500 psi on, Torq on 12k, torq off 8k. P/u 250k, S/O 182k, Rot 212k. AST 4.83 hrs, ART 2.36 hrs. 1 0/21 12002 00:00 - 23:00 23.00 DRILL C PROD1 Directionaly drill & survey from 14190 to 14733'. P/U 270k, SIO 167k, Rot 212k. 275 GPM, 65 STKs, Torq on 13.5k, Torq off 11k. PP on 1450 Psi, PP off 1350 Psi. AST 14.21 Hrs, ART 4.12 Hrs. (Unable to get neccessary dogleg to make turn, getting 15's & needing 22's to stay within geological hardline.) 23:00 - 23:00 24.00 DRILL C PROD1 Circulate & sweep hole. 23:00 - 00:00 1.00 DRILL C PROD1 Backream & POOH to 14733' to 14300'. P/U 275k, S/O 167k, 10 RPMs. 1100 Psi @ 275 Gpm. 10/22/2002 00:00 - 00:30 0.50 DRILL C PROD1 Con't to pump & backream out of hole to 14100'. 275 Gpm, 1420 Psi. 00:30 - 03:00 2.50 DRILL C PROD1 Circulate & pump 25 bbl Hi-Vis sweep surface to surface. 275 Gpm, 1420 Psi, 50 Rpms, Torq 10k. Had slight increase in cuttings when sweep came around. 03:00 - 07:30 4.50 DRILL C PROD1 Flow Check. POOH wI 5" DP to 2233'. Wet Trip. 07:30 - 08:30 1.00 DRILL C PROD1 Change out handling tools & POOH wI 4" DP. 08:30 - 09:30 1.00 DRILL C PROD1 POOH & LID MWD. Down load MWD. Remove MWD tools. Printed: 11/4/2002 2:21: 12 PM ') ) BP EXPLORATION Operations 5 umrnaryReport Page 16 of 20 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: W-38A W-38A REENTER+COMPLETE DOYON DOYON 14 Start: 9/30/2002 Rig Release: 10/31/2002 Rig Number: 14 Spud Date: 6/10/1988 End: 10/31/2002 'Date From ~ To HoUrs Task Code NPT Phase Descri ptionof Operations 1 0/22/2002 08:30 - 09:30 1.00 DRILL C PROD1 LID bit. 09:30 - 10:00 0.50 BOPSURC PROD1 Pull wear bushing. Install test plug. 10:00 - 14:00 4.00 BOPSURC PROD1 Pressure test BOPE. Test rams, Choke manifold, Lines & valves to LP 250 Psi, HP 3500 Psi. Test annular to LP 250 Psi, HP 3000 Psi. Test winessing waived by Chuck Sheve wi AOGCC. 14:00 - 15:00 1.00 BOPSURC PROD1 RID test equip. Pull plug & install wear bushing. 15:00 - 17:30 2.50 DRILL C PROD1 PJSM. M/U bit & adjust motor to 2.12 Deg. M/U & load MWD. Shallow test MWD. 17:30-18:30 1.00 DRILL C PROD1 RIH wi 4" DP. Change out handling tools fl 5" DP. 18:30 - 22:30 4.00 DRILL C PROD1 Con't to RIH wi 5" DP to 14014'. Fill pipe every 2800'. 22:30 - 23:30 1.00 DRILL C PROD1 Cut & slip 60' drilling line. 23:30 - 00:00 0.50 DRILL C PROD1 Con't to RIH to 14686'. Hole in good condition, no problems noted while going in open hole. 1 0/23/2002 00:00 - 09:00 9.00 DRILL C PROD1 Directionaly drill & survey from 14733 to 15145'. P/U 285k, S/O 145k, AST 6.96 hrs, ART 0 hrs. PP off 1420 psi, PP on 1540 psi, DH Rpm 80, 100% sliding. 09:00 - 09:30 0.50 DRILL C PROD1 Finish taking surveys. Circulate 2000 Stks. 09:30 - 10:30 1.00 DRILL C PROD1 POOH to above shoe @ 14000'. 10:30 - 12:00 1.50 DRILL C PROD1 Flow check, Pump slug. POOH wi 5" DP. 12:00 - 12:30 0.50 DRILL C PROD1 Service rig. 12:30 - 16:00 3.50 DRILL C PROD1 Con't to POOH from 13100' to 2233' wi 5" DP. 16:00 - 17:00 1.00 DRILL C PROD1 Change out handling tools for 4" DP. 17:00 - 17:30 0.50 DRILL C PROD1 POOH wi 4" DP from 2233'. 17:30 - 20:00 2.50 DRILL C PROD1 Flush tools. Stand back Des,. Down load MWD data. LID MWD. Break out bit. LID motor. 20:00 - 20:30 0.50 DRILL C PROD1 Bring new tools & equip up to rig floor. Function test Rams. 20:30 - 22:30 2.00 DRILL C PROD1 M/U bit & 1.5 degree motor. M/U MWD Load & program same. 22:30 - 00:00 1.50 DRILL C PROD1 Con'ìM/U BHA & RIH. Shallow test MWd. 10/24/2002 00:00 - 00:30 0.50 DRILL C PROD1 RIH wi 23 stands 4" DP to 2233'. 00:30 - 02:00 1.50 DRILL C PROD1 P/U 72 jts 4" DP 1x1& RIH. 02:00 - 02:30 0.50 DRILL C PROD1 Change out handling tools for 5" DP. 02:30 - 05:30 3.00 DRILL C PROD1 RIH wi 5" DP to 14020'. Fill pipe every 2800'. 05:30 - 06:30 1.00 DRILL C PROD1 Cut & slip 60 ' of drilling line. 06:30 - 08:30 2.00 DRILL C PROD1 Wash & circulate to bottom @15145'. 64 Stks, 275 Gpm, PP 1500 Psi. 08:30 - 00:00 15.50 DRILL C PROD1 Directionaly drill & survey from 15145 to 15705'. . P/U 250k, S/O 170k, ROT 207K. AST 3.8 Hrs, ART 6.03 Hrs. 64 Spm, 275 Gpm, PP on 1900 PSi, PP off 1570 Psi, Rpms 262 sliding, 327 rotating, Torq on 12K, Torq off 11 K. 10/25/2002 00:00 - 08:00 8.00 DRILL C PROD1 Directionaly drill from 15705 TO 15895'. P/U 250k, S/O 165k, ROT 205k. ART 1.68 Hrs, AST 2.13 Hrs. 64 Stks, 275 Gpm, T orq off 11 k, T orq on 13.5k. PP on 1900 Psi, PP off 1570 Psi. Sliding 262 Rpms, Rotating 327 Rpms. 08:00 - 09:00 1.00 DRILL C PROD1 Flow check. POOH from 15985 to 14035'. Wellbore in good shape except from 14040 to 14080'. (Shoe @ 14035') 09:00 - 10:00 1.00 DRILL C PROD1 RIH to bottom @ 15895'. 10:00 - 00:00 14.00 DRILL C PROD1 Directionaly drill from 15895 to 16210'. P/U 250k, S/O 170k, ROT 212k. ART 4.55 Hrs, AST 2.6 Hrs. 64 Stks, 275 Gpm, T orq on 13k, T orq off 11 k, PP on 1920 Psi, PP off 1580 Psi. Sliding 262 Rpms, Rotating 327 Rpms. 10/26/2002 00:00 - 00:00 24.00 DRILL C PROD1 Directionaly drill from 16210 to 17035'. P/U 265k, S/O 160k, ROT 215k, ART 6.82 Hrs, AST 8.32 Hrs. 64 Stks, 275 Gpm, Printed: 11/4/2002 2:21:12 PM '. ) ') / BP EXPLORATION Operations SurnmaryReport Page 17 of20 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: W-38A W-38A REENTER+COMPLETE DOYON DOYON 14 Start: 9/30/2002 Rig Release: 10/31/2002 Rig Number: 14 Spud Date: 6/10/1988 End: 10/31/2002 Date From- To Hours Task Code NPT Phase Description of Operations 1 0/26/2002 00:00 - 00:00 24.00 DRILL C PROD1 T orq off 12k, T orq on 13K. PP on 1850 Psi, PP off 1480 Psi. 262 DH Ppms, 327 Rotating. Re-enter TSAD @ 16590' & started seepage losses. Losses 1.5 bpm decreasing to 1 bpm. Total losses from 1600 hrs (16950') = 700 bbls. 1 0/27/2002 00:00 - 20:00 20.00 DRILL C PROD1 Directionaly drill from 17035 to 17700'. (TO) P/U 265k, S/O 170K, ROT 215k. AST 4.24 Hrs, ART 5.47 Hrs. 64 Stks, 275 Gpm, PP on 1900 Psi, PP off 1470 Psi, WOB 10-12k. Torq off 11 k, Torq on 13.5k. Sliding 262 Rpms, Rotating 327 Rpms.Hole taking approx 1 bpm while drilling. Hole remains full when static. 20:00 - 22:00 2.00 DRILL C PROD1 Pump sweep & circulate. 275 Gpm @ 1600 Psi. Get final survey & obtain SPRs. Slight increase in cuttings when sweep came around. 22:00 - 00:00 2.00 DRILL C PROD1 Flow check well. well static. POOH for 40 stand short trip to 14024'. Had 25k overpull on 2nd stand off bottom. worked pipe w/ no problem. Hole in very good condition. Hole started to take some fluid after 20th stand. Once up into casing. hole taking approx 6 Bph when static. 1 0/28/2002 00:00 - 02:30 2.50 DRILL C PROD1 Circulate bottoms up. Cut & slip 60' of drilling line. Flow check well, losing 6 bph while static. Lost 120 bbls while circulating bottoms up. 02:30 - 03:30 1.00 DRILL C PROD1 RIH back to 17640'. Worked thru tight spots @ 14455,14682 & 15247'. (worked pipe 2 times max to get thru) Otherwise hole in very good shape 03:30 - 07:30 4.00 DRILL C PROD1 M/U top drive & wash to bottom @ 17700'. circulate bottoms & pump sweep surface to surface. 275 Gpm @ 1470 Psi. Spot liner running pill thru open-hole section. Flow check well, well losing 8 bph static. 07:30 - 14:00 6.50 DRILL C PROD1 POOH w/ 5" DP. SLM. String wet. 14:00 - 15:00 1.00 DRILL C PROD1 Change out handling tools for 4" DP. 15:00 - 17:30 2.50 DRILL C PROD1 Stand back 12 stands of 4" DP. LID 105 jts of excess 4" DP. SLM. String wet. 17:30 - 20:00 2.50 DRILL C PROD1 Flush BHA w/ 6 bbls fresh water. Blow down top drive. LID DCs. Download & LID MWD, motor & Break out bit. 20:00 - 20:30 0.50 DRILL C PROD1 Clear & clean floor. LID all mise vendor tools. Function test rams. 20:30 - 21 :00 0.50 CASE C COMP R/U floor & tools for running 4 1/2" slotted liner. 21 :00 - 23:30 2.50 CASE C COMP PJSM. Run 41/2" slotted liner as per plan. Ran 94 jts total. TL 3794.75'. Slotted sections will be as follows: 16020-17570', 15703-15978',14414-14610'. TOL @ 13900'. 23:30 - 00:00 0.50 CASE C COMP Change out elevators & M/U liner hanger assy. Inspect same & RIH. Change out elevators. 10/29/2002 00:00 - 01 :00 1.00 CASE P COMP Held PJSM. RIH w/ 4-1/2" Liner on 4" DP. 01 :00 - 01 :30 0.50 CASE P COMP Circulated Liner Volume, Changed Out Handling Equipment f/ 5" DP. 01 :30 - 05:00 3.50 CASE P COMP RIH w/ 4-1/2" Liner on 5" DP to 7" Shoe @ 14,035', Broke Circulation. String Weight Up 280,000#, String Weight Down 170,000#. 05:00 - 06:30 1.50 CASE P COMP RIH w/ 4-1/2" Liner on 5" DP to 17,695'. Average Losses 50 bph. 06:30 - 08:00 1.50 CASE P COMP Dropped and Pumped Ball down to Hanger. Pressured Up to 2,500 psi to Set HMC Liner Hanger. Set Down on Liner w/ 10,000# to Ensure Hanger Set. Increased Pressure to 3,500 Printed: 11/4/2002 2:21:12 PM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: ) ) Page 18 of20 BP EXPLORA TtON OperationsSumrnaryReport W-38A W-38A REENTER+COMPLETE DOYON DOYON 14 Date From- To Hours Task Code NPT Phase 1.50 CASE P COMP 10/29/2002 06:30 - 08:00 08:00 - 10:30 2.50 CASE P LNR2 10:30 - 12:00 1.50 CASE P LNR2 12:00 - 13:30 1.50 CASE P LNR2 13:30 - 19:00 5.50 CASE P LNR2 19:00 - 20:00 1.00 CASE P LNR2 20:00 - 20:30 0.50 BOPSUR P COMP 20:30 - 21 :30 1.00 RUNCOIVP COMP 21 :30 - 23:00 1.50 RUNCOIVP COMP 23:00 - 00:00 1.00 RUNCOIVP COMP Start: 9/30/2002 Rig Release: 10/31/2002 Rig Number: 14 Spud Date: 6/10/1988 End: 10/31/2002 Descri ptionof Operations psi to Release Tool. Rotated Drill String to the Right 20 Turns to Complete Release of Running Tool from Liner. Picked up on Drill String to Ensure Running Tool was Released from Liner. Set Down on Liner wi 45,000# and Set ZXP Packer, Observed Packer Shearing and Setting. Average Losses 45 bph. 4-1/2" Liner Set As Follows: Item Length Depth 1.71' Guide Shoe 17,695.00' 1 Jt 4-112" 12.6# L-80 Solid Liner 17,652.92' Pack Off Bushing 17,651.61 ' 2 Jts 4-1/2" 12.6# L-80 Solid Liner 17,570.50' 39 Jts 4-1/2" 12.6# L-80 Slotted Liner 1,550.22' 16,020.28' 1 Jt 4-1/2" 12.6# L-80 Solid Liner 15,978.36' 7 Jts 4-1/2" 12.6# L-80 Slotted Liner 15,702.64' 27 Jts 4-1/2" 12.6# L-80 Solid Liner 14,609.99' 5 Jts 4-1/2" 12.6# L-80 Slotted Liner 14,413.69' 12Jts 4-1/2" 12.6# L-80 Solid Liner 13,930.48' 4-1/2" 12.6# L-80 Pup Jt 13,924.74' XO Bushing 13,923.35' HMC Liner Hanger 13,914.02' ZXP Liner Top Packer 13,907.77' Tie Back Sleeve 13,900.25' Displaced the Hole to Seawater, Pump Rate 10 bpm, 1,500 psi. Shut Down Pumps and Flow Checked, Fluid Dropped in Wellbore. Average Losses 45 bph. POOH wi 5" DP, Racked 37 Stands in Derrick. Held PJSM. Slipped and Cut Drilling Line, Serviced Rig. POOH LID 5" and 4" DP. Losses Continued at 50 bph. Broke Out and LID Running Tool. M 1 U Retrieving Tool, Latched and Pulled Wear Bushing. Cleaned and Cleared Rig Floor. Losses Continued at 50 bph. Held PJSM. R 1 U Equipment to Run 4-1/2" 13Cr Yam Ace Completion. M 1 U WLEG Assembly, XN Nipple Assembly, X Nipple Assembly, 7" x 4-1/2" Packer Assembly, X Nipple Assembly and GLM #1 Assembly. BakerLoc'd All Connections Below Packer. M 1 U Torque 3,620 ft Ilbs. Losses Continued at 40 40.37' 1.31' 81.11' 41.92' 275.72' 1,092.65' 196.30' 483.21' 5.74' 1.39' 9.33' 6.25' 7.52' Printed: 11/4/2002 2:21 :12 PM ) ) BP EXPLORATION QperationsSurnmary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: W-38A W-38A REENTER+COMPLETE DOYON DOYON 14 Date From -To Hours Task Code NPT Phase 1 0/29/2002 23:00 - 00:00 1.00 RUNCOrvP caMP 10/30/2002 00:00 - 14:00 14.00 RUNCOrvP COMP 14:00 - 16:00 2.00 RUNCOrvP caMP 16:00 - 17:00 1.00 RUNCOrvP caMP Page 19 of20 Spud Date: 6/10/1988 End: 10/31/2002 Start: 9/30/2002 Rig Release: 10/31/2002 Rig Number: 14 bph. Description of Operations Total Losses Last 24 hrs 990 bbls. Held PJSM. RIH wI 322 Jts of 4-1/2" 12.6# L-80 13Cr Vam Ace Tubing to 13,903'. Torque Turned All Connections. M I U Torque 3,620 ft Ilbs. Engaged Pump, Rate 3 bpm, 200 psi. RIH to Tag Up in Tie-Back Sleeve. Observed 50 psi Increase and Set Down wI 15,000#. Repeated Several Times to Ensure WLEG Inside Tie-Back Sleeve. P I U 3' and Spaced Out Tubing wI Pup Joints. M I U Tubing Hanger and Landing Joint. Landed Tubing Hanger in Wellhead, RILDS. Completion Equipment Set at the Following Depths: Item Depth WLEG Assembly 13,901.00' XN Nipple Assembly 13,867.77' X Nipple Assembly 13,847.01' 7" x 4-1/2 S-3 Packer Assembly 13,823.29' X Nipple Assembly 13,802.46' #1 GLM Assembly 13,775.79' 60 Jts 4-1/2" 12.6# L-80 13Cr Va mAce Tbg 2,545.83' 11,229.96' #2 GLM Assembly 11,201.71' 66 Jts 4-1/2" 12.6# L-80 13CrVamAce Tbg 2,782.67' 8,419.04' #3 GLM Assembly 8,390.77' 101 Jts 4-1/2" 12.6# L-80 13Cr VamAce Tbg 4,279.92' 4,110.85' #4 GLM Assembly wI RP Shear Valve 4,082.45' 44 Jts 4-1/2" 12.6# L-80 13Cr VamAce Tbg 1,863.95' 2,218.50' X Nipple Assembly 2,197.62' 50 Jts 4-1/2" 12.6# L-80 13CrVamAce Tbg 2,088.28' 109.34' 4 - 4-1/2" 12.6# L-80 13Cr Va mAce Pup Jts 34.88' 74.46' 1 Jt 4-1/2" 12.6# L-80 13Cr VamAce Tbg 33.77' Length 11.26' 20.97' 20.76' 23.72' 20.83' 26.67' 28.28' 28.27' 28.40' 20.88' 40.69' Printed: 11/4/2002 2:21 :12 PM ) ) Page 200f 20 BP EXPLORATION Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: W-38A W-38A REENTER+COMPLETE DOYON DOYON 14 Date From - To Hours Task Code NPT Phase 10/30/2002 16:00 - 17:00 1.00 RUNCOrvP COMP 17:00 - 18:00 1.00 RUNCOrvP COMP 18:00 - 21 :00 3.00 RUNCOrvP COMP 21 :00 - 23:30 2.50 RUNCOrvP COMP 23:30 - 00:00 0.50 RUNCOrvP COMP 1 0/31 /2002 00:00 - 00:30 0.50 WHSUR P COMP 00:30 - 01 :30 1.00 BOPSURP COMP 01 :30 - 03:30 2.00 WHSUR P COMP 03:30 - 04:00 0.50 WHSUR P COMP 04:00 - 05:00 1.00 RUNCOrvP COMP 05:00 - 09:30 4.50 RUNCOrvP COMP 09:30 - 10:30 1.00 RUNCOrvP COMP 10:30 - 11 :30 1.00 RUNCOrvP COMP 11 :30 - 12:30 1.00 RUNCOrvP COMP 12:30 - 14:00 1.50 RUNCOrvP COMP 14:00 - 15:00 1.00 PULL P COMP Start: 9/30/2002 Rig Release: 10/31/2002 Rig Number: 14 Spud Date: 6/10/1988 End: 10/31/2002 Description of Operations Tubing Hanger 30.50' Held PJSM. R / U Circulating Head, Manifold and Lines. Reverse Circulated 521 bbls of Corrosion Inhibited Clean Sea Water Down 9-5/8" x 4-1/2" Annulus. Pump Rate 3 bpm, 230 psi. Held PJSM. Opened Ram Doors and Cleaned out Ram Cavities, Changed out Upper Pipe Rams to 2-7/8" x 5" Variables. Held PJSM. Dropped Ball / Rod Assembly. Pressured up on Tubing to 2,500 psi to set Packer. Tested Tubing to 3,500 psi f/ 30 Minutes. OK. Bled Tubing Pressure Down to 2,000 psi. Pressure Tested IA to 3,500 psi f/ 30 Minutes, OK. Bled Down Tubing Pressure Sheared RP Valve. Bled Down All Pressure. Pumped Down IA to establish Rate, Pump Rate 5 bpm, 950 psi. Attempted to Pump Down Tubing, Established Flow for 1 Minute, Tubing Pressured Up. Bled Down Tubing. Established Pump Rate Down IA and Up Tubing, Rate 5 bpm, 950 psi. Attempted to Pump Down Tubing and Up IA. Tubing Pressured Up and Held Pressure. Bled Down Tubing. Notified Slickline to Pull RP Shear Valve. R / D Circulating Lines, Backed out and L / D Landing Joint. Held PJSM. Ran and Set TWC in Hanger Profile. Held PJSM. N / D BOPE. 3.30' Held PJSM. N / U Adapter Flange and Production Tree. Cameron Tested Adapter Flange to 5,000 psi f/ 10 minutes. OK. R / U and Tested Tree to 5,000 psi, OK. Held PJSM. R / U DSM Lubricator, Pulled TWC. R / D DSM. Held PJSM. R / U Halliburton Slickline Unit. R / U Riser and Wireline BOP's. RIH w/ Catcher Sub on Slickfine, Set Catcher Sub at 4,200'. POOH w/ Slickline, M / U GLV Catcher. RIH w/ GLV Catcher on Slickline to 4,100'. Latched up GLV, Could not Pull GLV, Sheared off of GL V, POOH w/ Slickline and Catcher. Repinned GLV Catcher and RIH to 4,100'. Latched up on and Pulled GLV from Mandrel. POOH w/ GLV. M / U Sub Catcher Tool. RIH w/ Slickline and Retrieved Catcher Sub, POOH. R / D Riser, Wireline BOP's and Sfickline Unit. Held PJSM. R / U Little Red Hot Oil. Tested Lines to 3,000 psi, OK. Pumped 140 bbls of Diesel Down 9-5/8" x 4-1/2" Annulus to Freeze Protect. Pump Rate 2.5 bpm, 1,100 psi. R / U Lines and U-Tubed Diesel between IA and 4-1/2" Tubing. Freeze Protected IA and Tbg to 2,200'. R / D Little Red Hot Oil Unit. Removed 2nd Annulus Valve, Installed Tree Cap & Gauges. Installed Blind Flange on Annulus Valve. Secured Well. Released Rig @ 15:00 Hrs, 10/31 /2002. Printed: 11/4/2002 2:21: 12 PM ) ) aoa-J9¡ 18-Nov-02 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Well previously named W-38L 1 Re: Distribution of Survey Data for Well PBU_WOA W-38A Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: 13,297.35' MD Window / Kickoff Survey 13,339.00' MD (if applicable) Projected Survey: 17,700.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment( s) RECEIVED NOV 19 2002 Alaska Q¡i & Gas Cons. Commission Anchorage , ' Sperry-Sun Drilling Services North Slope Alaska BPXA PBU- WOA W Pad W..38A .~ Job No. AKZZ22164, Survey Report 15 November, 2002 Your Ref: 500292180701 Surface Coordinates: 5958897.05 N, 611789.00 E (70017' 47.9825" N, 149005' 41.1160" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 '~' Surface Coordinates relative to Project H Reference: 958897.05 N, 111789.00 E (Grid) Surface Coordinates relative to Structure Reference: 1674.82 N, 1898.72 E (True) Kelly Bushing: 88. 11ft above Mean Sea Level Elevation relative to Project V Reference: 88. 11ft Elevation relative to Structure Reference: 88.11 ft spe""I''Y-5UI! [J ~ I L. L. n'ft5,.,nn.$Eæ R v I c: e s A Halliburton Company Survey Ref: svy11358 Sperry-Sun Drilling Services ~ Survey Report for PBU- WOA W Pad - W-38A Your Ref: 500292180701 Job No. AKZZ22164, BPXA North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (It) (It) (It) (It) (It) (It) (It) (°/1 OOIt) 13297.35 52.110 219.350 8181.36 8269.47 8179.69 S 5154.24 W 5950641 .60 N 606756.99 E -9647.51 Tie-on Point AK-6 BP _IFR-AK .. 13339.00 52.360 219.380 8206.87 8294.98 - 8205.14 S 5175.13 W 5950615.84 N 606736.49 E 0.603 -9679.84 Window Point 13469.33 52.380 228.730 8286.56 8374.67 8279.18 S 5246.76 W 5950540.75 N 606665.97 E 5.679 -9779.07 13504.92 52.550 229.240 8308.24 8396.35 8297.70 S 5268.05 W 5950521.91 N 606644.95 E 1 .233 -9805.51 13536.72 52.890 231.090 8327.50 8415.61 8313.91 S 5287.48 W 5950505.42 N 606625.76 E 4.751 -9829.01 .~ 13565.56 53.370 232.110 8344.81 8432.92 8328.24 S 5305.56 W 5950490.82 N 606607.90 E 3.283 -9850.23 13601.58 53.730 235.790 8366.21 8454.32 8345.28 S 5328.98 W 5950473.43 N 606584.73 E 8.278 -9876.38 13633.64 53.440 238.860 8385.25 8473.36 8359.21 S 5350.70 W 5950459.18 N 606563.23 E 7.759 -9898.97 13662.27 53.540 241.530 8402.28 8490.39 8370.64 S 5370.66 W 5950447.45 N 606543.44 E 7.504 -9918.54 13759.35 53.600 245.620 8459.95 8548.06 8405.39 S 5440.58 W 5950411.67 N 606474.04 E 3.390 -9982.42 13852.60 52.900 245.240 8515.74 8603.85 8436.46 S 5508.53 W 5950379.59 N 606406.56 E 0.819 -10042.12 13947.57 53.510 249.010 8572.64 8660.75 8466.00 S 5578.59 W 5950349.01 N 606336.95 E 3.243 -10101.48 13988.15 53.180 248.620 8596.86 8684.97 8477.76 S 5608.94 W 5950336.80 N 606306.78 E 1.121 -10126.30 14074.69 55.410 248.830 8647.37 8735.48 8503.26 S 5674.42 W 5950310.33 N 606241.68 E 2.584 -10179.92 14105.82 57.620 250.760 8664.54 8752.65 8512.22 S 5698.79 W 5950301.01 N 606217.46 E 8.782 -10199.41 14136.62 62.040 254.590 8680.02 8768.13 8520.13 S 5724.20 W 5950292.72 N 606192.16E 17.927 -10218.48 14173.32 68.060 259.310 8695.50 8783.61 8527.60 S 5756.59 W 5950284.77 N 606159.88 E 20.120 -10240.49 14205.88 67.800 264.470 8707.74 8795.85 8531.86 S 5786.45 W 5950280.07 N 606130.09 E 14.707 -10258.47 14233.52 67.930 270.790 8718.17 8806.28 8532.91 S 5812.02 W 5950278.63 N 606104.54 E 21.184 -10271.58 14266.22 67.460 278.100 8730.59 8818.70 8530.57 S 5842.15 W 5950280.52 N 606074.38 E 20.730 -10283.89 14297.96 67.210 283.070 8742.83 8830.94 8525.20 S 5870.93 W 5950285.47 N 606045.52 E 14.470 -10292.88 14327.43 66.520 282.010 8754.41 8842.52 8519.31 S 5897.39 W 5950290.96 N 606018.98 E 4.052 -10300.32 ~. 14361.76 66.330 283.020 8768.14 8856.25 8512.50 S 5928.10 W 5950297.32 N 605988.17 E 2.753 -10308.97 14393.65 69.260 287.490 8780.19 8868.30 8504.72 S 5956.57 W 5950304.67 N 605959.59 E 15.898 -10315.71 14423.82 69.520 292.540 8790.82 8878.93 8495.06 S 5983.09 W 5950313.94 N 605932.92 E 15.690 -10319.85 14455.84 70.240 296.870 8801.84 8889.95 8482.49 S 6010.40 W 5950326.10 N 605905.44 E 12.895 -10321.83 14490.04 71.160 302.610 8813.15 8901.26 8466.48 S 6038.41 W 5950341.69 N 605877.19 E 16.066 -10321.11 14517.74 73.280 305.350 8821.61 8909.72 8451.74 S 6060.27 W 5950356.10 N 605855.11 E 12.136 -10318.57 14551.42 74.690 309.790 8830.91 8919.02 8432.01 S 6085.92 W 5950375.45 N 605829.17 E 13.344 -10313.45 14582.96 76.090 312.020 8838.86 8926.97 8412.02 S 6108.99 W 5950395.09 N 605805.81 E 8.155 -10306.87 15 November, 2002 - 9:07 Page 2 of 5 DrillQuest 3.03.02.004 Sperry-Sun Drilling Services Survey Report for PBU- WOA W Pad - W-38A Your Ref: 500292180701 Job No. AKZZ22164, BPXA North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft) 14614.37 80.610 313.960 8845.20 8933.31 8391.05 S 6131.48 W 5950415.73 N 605783.01 E 15.609 -10299.16 14650.33 86.120 313.900 8849.36 8937.47 8366.28 S 6157.19 W 5950440.12 N 605756.93 E 15.323 -10289.64 14682.10 90.860 318.680 8850.20 8938.31 8343.33 S 6179.13 W 5950462.73 N 605734.66 E 21.182 -10279.93 14711.57 92.210 322.900 8849.41 8937.52 8320.51 S 6197.74 W 5950485.27 N 605715.70 E 15.029 -10268.74 14745.76 90.800 328.380 8848.51 8936.62 8292.31 S 6217.03 W 5950513.19 N 605696.00 E 16.544 -10253.14 '~~ 14777.10 87.540 334.200 8848.96 8937.07 8264.84 S 6232.07 W 5950540.43 N 605680.55 E 21.281 -10236.17 14806.67 88.650 340.560 8849.95 8938.06 8237.57 S 6243.43 W 5950567.52 N 605668.78 E 21.821 -10217.61 14841 .13 90.920 347.180 8850.07 8938.18 8204.49 S 6253.00 W 5950600.46 N 605658.73 E 20.307 -10193.09 14873.33 90.310 354.460 8849.73 8937.84 8172.73 S 6258.13 W 5950632.14 N 605653.12 E 22.687 -10167.62 14902.54 90.370 359.410 8849.56 8937.67 8143.57 S 6259.69 W 5950661.28 N 605651.13 E 16.947 -10142.73 14936.66 89.510 6.000 8849.59 8937.70 8109.51 S 6258.08 W 5950695.36 N 605652.23 E 19.478 -10112.02 14968.62 89.140 11.830 8849.97 8938.08 8077.95 S 6253.13 W 5950726.99 N 605656.71 E 18.277 -10081.92 14997.91 88.890 17.380 8850.47 8938.58 8049.62 S 6245.75 W 5950755.42 N 605663.67 E 18.965 -10053.49 15030.22 89.820 23.810 8850.84 8938.95 8019.39 S 6234.39 W 5950785.81 N 605674.58 E 20.107 -10021.51 15061.71 90.120 30.500 8850.85 8938.96 7991.39 S 6220.03 W 5950814.03 N 605688.52 E 21.266 -9990.04 15103.02 90.680 37.660 8850.56 8938.67 7957.20 S 6196.90 W 5950848.56 N 605711.14 E 17.385 -9948.96 15136.54 90.920 45.650 8850,09 8938.20 7932.18 S 6174.64 W 5950873.91 N 605733.03 E 23.845 -9916.35 15168.05 89.260 48.550 8850.05 8938.16 7910.73 S 6151.56W 5950895.70 N 605755.78 E 10.604 -9886.50 15199.55 88.950 49.340 8850.54 8938.65 7890.04 S 6127.81 W 5950916.73 N 605779.23 E 2.694 -9856.99 15247.86 89.020 48.950 8851.39 8939.50 7858.45 S 6091.28 W 5950948.87 N 605815.29 E 0.820 -9811.80 15294.60 89.750 48.900 8851.89 8940.00 7827.74 S 6056.04 W 5950980.10 N 605850.06 E 1.565 -9768.01 15341 .15 89.630 49.430 8852.15 8940.26 7797.30 S 6020.82 W 5951011.06 N 605884.82 E 1.167 -9724.47 15391.42 88.580 51.500 8852.93 8941.04 7765.31 S 5982.06 W 5951043.62 N 605923.10 E 4.617 -9677.86 ,-",' 15438.80 89.690 53.630 8853.65 8941.76 7736.51 S 5944.45 W 5951072.98 N 605960.28 E 5.069 -9634.62 15486.62 90.980 54.610 8853.37 8941 .48 7708.49 S 5905.70 W 5951101.57 N 605998.61 E 3.388 -9591.51 15534.41 91.050 55.190 8852.52 8940.63 7681.01 S 5866.61 W 5951129.63 N 606037.29 E 1.222 -9548.73 15583.20 89.200 57.230 8852.41 8940.52 7653.88 S 5826.07 W 5951157.36 N 606077.42 E 5.644 -9505.55 15628.83 92.280 58.820 8851.83 8939.94 7629.72 S 5787.37 W 5951182.09 N 606115.76 E 7.596 -9465.86 15676.89 93.320 59.610 8849.48 8937.59 7605.15 S 5746.13 W 5951207.27 N 606156.63 E 2.716 -9424.61 15726.68 92.710 58.890 8846.86 8934.97 7579.73 S 5703.40 W 5951233.32 N 606198.97 E 1.894 -9381.89 15773.47 94.000 59.410 8844.12 8932.23 7555.78 S 5663.30 W 5951257.87 N 606238.71 E 2.972 -9341.72 15819.81 94.500 58.690 8840.69 8928.80 7532.01 S 5623.67 W 5951282.22 N 606277.99 E 1.888 -9301.94 15869.36 94.740 57.550 8836.70 8924.81 7505.93 S 5581.73 W 5951308.93 N 606319.53 E 2.344 -9259.02 15916.89 94.120 54.390 8833.02 8921.13 7479.41 S 5542.46 W 5951336.03 N 606358.40 E 6.756 -9216.99 15965.46 93.320 50.290 8829.87 8917.98 7449.81 S 5504.10 W 5951366.20 N 606396.32 E 8.583 -9172.67 15 November, 2002 - 9:07 Page 3 of 5 DrillQuest 3.03.02.004 Sperry-Sun Drilling Services Survey Report for PBU- WOA W Pad - W-38A Your Ref: 500292180701 Job No. AKZZ22164, BPXA North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft) 16013.04 92.090 47.550 8827.62 8915.73 7418.58 S 5468.28 W 5951397.96 N 606431.67 E 6.306 -9128.15 16061.63 90.000 45.680 8826.74 8914.85 7385.21 S 5432.98 W 5951431.85 N 606466.47 E 5.771 -9081.99 16109.41 88.650 45.1 00 8827.30 8915.41 7351.66 S 5398.97 W 5951465.90 N 606499.98 E 3.075 -9036.28 16157.39 89.020 44.110 8828.28 8916.39 7317.51 S 5365.28 W 5951500.55 N 606533.15 E 2.202 -8990.20 16205.69 87.350 41.610 8829.81 8917.92 7282.12 S 5332.45 W 5951536.42 N 606565.46 E 6.222 -8943.44 ~" 16253.35 87.480 41.930 8831.96 8920.07 7246.61 S 5300.73 W 5951572.39 N 606596.64 E 0.724 -8897.11 16301.17 87.350 44.500 8834.11 8922.22 7211.80 S 5268.02 W 5951607.69 N 606628.83 E 5.376 -8850.92 16348.96 87.850 44.770 8836.11 8924.22 7177.83 S 5234.48 W 5951642.16 N 606661.87 E 1.189 -8805.05 16397.20 85.630 46.050 8838.86 8926.97 7144.02 S 5200.18 W 5951676.48 N 606695.66 E 5.310 -8758.99 16433.89 86.680 49.440 8841.32 8929.43 7119.41 S 5173.09 W 5951701.49 N 606722.38 E 9.653 -8724.44 16490.94 86.670 48.840 8844.63 8932.74 7082.15 S 5130.01 W 5951739.38 N 606764.89 E 1.050 -8671 .15 16538.20 86.800 49.41 0 8847.32 8935.43 7051.27 S 5094.34 W 5951770.79 N 606800.11 E 1.235 -8627.00 16585.76 85.630 48.750 8850.46 8938.57 7020.18 S 5058.48 W 5951802.40 N 606835.50 E 2.823 -8582.58 16634.91 87.420 50.480 8853.44 8941.55 6988.40 S 5021.11 W 5951834.74 N 606872.39 E 5.060 -8536.83 16683.20 88.710 52.140 8855.07 8943.18 6958.23 S 4983.44 W 5951865.46 N 606909.61 E 4.352 -8492.35 16730.62 88.890 52.160 8856.06 8944.17 6929.14 S 4946.01 W 5951895.11 N 606946.60 E 0.382 -8448.94 16778.49 89.080 52.130 8856.91 8945.02 6899.77 S 4908.22 W 5951925.04 N 606983.95 E 0.402 -8405.10 16826.67 89.020 51.960 8857.71 8945.82 6870.14 S 4870.23 W 5951955.23 N 607021.49 E 0.374 -8360.95 16869.16 88.950 51 .900 8858.46 8946.57 6843.95 S 4836.79 W 5951981.92 N 607054.54 E 0.217 -8321.98 16922.67 88.950 50.830 8859.44 8947.55 6810.54 S 4795.00 W 5952015.94 N 607095.83 E 1.999 -8272.69 16970.03 89.940 49.920 8859.90 8948.01 6780.34 S 4758.52 W 5952046.68 N 607131.86 E 2.839 -8228.75 17017.16 90.250 50.430 8859.82 8947.93 6750.16 S 4722.32 W 5952077.40 N 607167.60 E 1.266 -8184.97 17065.04 89.940 51.110 8859.74 8947.85 6719.88 S 4685.24 W 5952108.23 N 607204.23 E 1.561 -8140.67 '~ 17112.76 90.680 51.240 8859.49 8947.60 6689.96 S 4648.06 W 5952138.69 N 607240.96 E 1.574 -8096.65 17152.77 90.860 50.950 8858.95 8947.06 6664.83 S 4616.93 W 5952164.28 N 607271.72 E 0.853 -8059.72 17209.14 91.110 48.690 8857.98 8946.09 6628.47 S 4573.87 W 5952201.28 N 607314.23 E 4.033 -8007.23 17256.93 90.490 49.750 8857.31 8945.42 6597.26 S 4537.69 W 5952233.02 N 607349.94 E 2.569 -7962.54 17305.14 88.650 48.920 8857.67 8945.78 6565.85 S 4501.12 W 5952264.98 N 607386.04 E 4.187 -7917.50 17354.07 86.310 46.920 8859.82 8947.93 6533.09 S 4464.84 W 5952298.27 N 607421.83 E 6.288 -7871.41 17400.73 85.070 46.560 8863.33 8951.44 6501.21 S 4430.96 W 5952330.65 N 607455.23 E 2.767 -7827.23 17449.58 82.840 45.060 8868.48 8956.59 6467.35 S 4396.13 W 5952365.03 N 607489.55 E 5.492 -7780.86 17496.34 80.480 44.020 8875.26 8963.37 6434.38 S 4363.68 W 5952398.48 N 607521.51 E 5.506 -7736.41 17543.93 78.110 44.460 8884.10 8972.21 6400.88 S 4331.06 W 5952432.46 N 607553.63 E 5.062 -7691.41 17592.46 77.780 44.300 8894.23 8982.34 6366.96 S 4297.86 W 5952466.87 N 607586.31 E 0.753 -7645.77 17632.86 77.460 44.120 8902.89 8991.00 6338.68 S 4270.35 W 5952495.56 N 607613.41 E 0.904 -7607.79 15 November, 2002 - 9:07 Page 4 of 5 DrillQuest 3.03.02.004 Sperry-Sun Drilling Services Survey Report for PBU- WOA W Pad - W-38A Your Ref: 500292180701 Job No. AKZZ22164, North Slope Alaska Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) 17700.00 77.460 44.120 8917.47 9005.58 Local Coordinates Northings Eastings (ft) (ft) 6291.63 S 4224.72 W All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from Well Reference and calculated along an Azimuth of 28.470° (True). Magnetic Declination at Surface is 25.874°(28-Sep-02) Based upon Minimum Curvature type calculations, at a Measured Depth of 17700.00ft., The Bottom Hole Displacement is 7578.45ft., in the Direction of 213.881 ° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 13297.35 13339.00 17700.00 8179.69 S 8205.14 S 6291.63 S Tie-on Point Window Point Projected Survey 8269.47 8294.98 9005.58 5154.24 W 5175.13W 4224.72 W Survey tool program for W-38A From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth (ft) (ft) Survey Tool Description 0.00 13297.35 8269.47 AK-1 BP _HG - BP High Accuracy Gyro(W-38) 9005.58 AK-6 BP _IFR-AK(W-38A) 0.00 13297.35 8269.47 17700.00 15 November, 2002 - 9:07 Page 5 of 5 Global Coordinates Northings Eastings (ft) (ft) 5952543.28 N 607658.33 E Dogleg Vertical Rate Section Comment (°/1 OOft) 0.000 -7544.68 Projected Survey DrillQuest 3.03.02.004 , ~ BPXA ~' , ......,ø-' ') ¿;¡ Q;)~ ¡q I 08-Nov-02 AOGCC Lisa Weepie 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Re: Distribution of Survey Data for Well W-38L 1 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies. Tie-on Survey: 13,297.35' MD Window / Kickoff Survey 13,339.00' MD (if applicable) Projected Survey: 17,700.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager RECEIVED Nov 7 2 2002 Alaska 011 & Gas ~~ Attachment(s) Sperry-Sun Drilling Services North Slope Alaska BPXA PBU- WOA W Pad W-38A MWD ~ Job No. AKMW22164, Survey Report 15 November, 2002 Your Ref: 500292180701 Surface Coordinates: 5958897.05 N, 611789.00 E (70017' 47.9825" N, 149005' 41.1160" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 '~ Surface Coordinates relative to Project H Reference: 958897.05 N, 111789.00 E (Grid) Surface Coordinates relative to Structure Reference: 1674.82 N, 1898.72 E (True) Kelly Bushing: 88. 11ft above Mean Sea Level Elevation relative to Project V Reference: 88.11ft Elevation relative to Structure Reference: 88.11 ft spe""''''''y-5UI'1 D f:tJa;~L I N,13 .. !ŠfefR\l ì c::E S A Halliburton Company Survey Ref: svy11357 Sperry-Sun Drilling Services Survey Report for PBU- WOA W Pad. W.38A MWD Your Ref: 500292180701 Job No. AKMW22164, BPXA North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 OOft) 13297.35 52.110 219.350 8181.36 8269.47 8179.69 S 5154.24 W 5950641.60 N 606756.99 E -9647.51 Tie-on Point MWD Magnetic 13339.00 52.360 219.380 8206.87 8294.98 8205.14 S 5175.13W 5950615.84 N 606736.49 E 0.603 -9679.84 Window Point 13469.33 52.380 228.790 8286.56 8374.67 8279.14 S 5246.80 W 5950540.79 N 606665.93 E 5.716 -9779.06 13504.92 52.550 230.080 8308.24 8396.35 8297.49 S 5268.24 W 5950522.12 N 606644.76 E 2.914 -9805.41 13536.72 52.890 231.920 8327.50 8415.61 8313.41 S 5287.90 W 5950505.90 N 606625.34 E 4.726 -9828.78 "",-",' 13565.56 53.370 232.860 8344.81 8432.92 8327.49 S 5306.18 W 5950491.55 N 606607.28 E 3.093 -9849.87 13601.58 53.730 236.650 8366.21 8454.32 8344.21 S 5329.83 W 5950474.49 N 606583.87 E 8.522 -9875.84 13633.64 53.440 239.710 8385.25 8473.36 8357.81 S 5351.75 W 5950460.57 N 606562.16 E 7.734 -9898.24 13662.27 53.540 242.430 8402.28 8490.39 8368.94 S 5371 .89 W 5950449.14 N 606542.19 E 7.644 -9917.62 13759.35 53.600 246.890 8459.95 8548.06 8402.35 S 5442.45 W 5950414.68 N 606472.13 E 3.697 -9980.64 13852.60 52.900 246.260 8515.75 8603.86 8432.05 S 5511 .01 W 5950383.96 N 606404.02 E 0.925 -1 0039.43 13947.57 53.510 250.010 8572.64 8660.75 8460.36 S 5581.57 W 5950354.61 N 606333.89 E 3.226 -10097.95 13988.15 53.180 249.490 8596.87 8684.98 8471.62 S 5612.11 W 5950342.89 N 606303.52 E 1.311 -10122.41 14074.69 55.410 250.180 8647.37 8735.48 8495.84 S 5678.08 W 5950317.69 N 606237.92 E 2.657 -10175.14 14105.82 57.620 252.200 8664.55 8752.66 8504.21 S 5702.65 W 5950308.96 N 606213.47 E 8.926 -10194.21 14136.62 62.040 256.460 8680.03 8768.14 8511.37 S 5728.28 W 5950301.42 N 606187.95 E 18.675 -10212.73 14173.32 68.060 260.620 8695.51 8783.62 8517.95 S 5760.87 W 5950294.35 N 606155.46 E 19.353 -10234.05 14205.88 67.800 265.960 8707.75 8795.86 8521.48 S 5790.83 W 5950290.38 N 606125.56 E 15.219 -1 0251.42 14233.52 67.930 271.560 8718.17 8806.28 8522.03 S 5816.41 W 5950289.45 N 606099.99 E 18.772 -10264.11 14266.22 67.460 279.870 8730.60 8818.71 8519.02 S 5846.48 W 5950292.01 N 606069.88 E 23.552 -10275.80 14297.96 67.210 282.830 8742.83 8830.94 8513.26 S 5875.19 W 5950297.34 N 606041.09 E 8.641 -10284.42 14327.43 66.520 283.500 8754.41 8842.52 8507.09 S 5901.58 W 5950303.12 N 606014.61 E 3.139 -10291.57 ~ 14361.76 66.330 286.650 8768.14 8856.25 8498.91 S 5931.96 W 5950310.85 N 605984.11 E 8.428 -10298.86 14393.65 69.260 287.990 8780.20 8868.31 8490.12 S 5960.14 W 5950319.22 N 605955.81 E 9.977 -10304.57 14423.82 69.520 293.540 8790.82 8878.93 8480.11 S 5986.53 W 5950328.84 N 605929.27 E 17.239 -10308.35 14455.84 70.240 298.400 8801.84 8889.95 8466.94 S 6013.55 W 5950341.60 N 605902.06 E 14.427 -10309.66 14490.04 71 .160 303.100 8813.15 8901.26 8450.44 S 6041.27 W 5950357.68 N 605874.09 E 13.246 -10308.37 14517.74 73.280 307.030 8821.61 8909.72 8435.29 S 6062.85 W 5950372.51 N 605852.28 E 15.526 -10305.34 14551.42 74.690 311.980 8830.91 8919.02 8414.70 S 6087.82 W 5950392.73 N 605827.01 E 14.733 -10299.14 14582.96 76.090 313.720 8838.87 8926.98 8393.94 S 6110.19 W 5950413.15 N 605804.34 E 6.943 -10291.56 15 November, 2002.9:08 Page 2 of 5 DrillQuest 3.03.02.004 Sperry-Sun Drilling Services Survey Report for PBU- WOA W Pad - W-38A MWD Your Ref: 500292180701 Job No. AKMW22164, BPXA North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) CO/100ft) 14614.37 80.610 314.920 8845.21 8933.32 8372.45 S 6132.19 W 5950434.31 N 605782.02 E 14.869 -10283.16 14650.33 86.120 314.250 8849.36 8937.47 8347.39 S 6157.62 W 5950458.99 N 605756.22 E 15.434 -10273.25 14682.10 90.860 317.790 8850.20 8938.31 8324.55 S 6179.67 W 5950481.51 N 605733.84 E 18.617 -10263.67 14711.57 92.210 322.530 8849.41 8937.52 8301.94 S 6198.54 W 5950503.84 N 605714.63 E 16.718 -10252.79 14745.76 90.800 329.920 8848.51 8936.62 8273.55 S 6217.52 W 5950531.94 N 605695.23 E 21.997 -10236.88 ""-'~ 14777.10 87.540 336.270 8848.96 8937.07 8245.62 S 6231.69 W 5950559.65 N 605680.64 E 22.771 -10219.09 14806.67 88.650 341.770 8849.95 8938.06 8218.04 S 6242.27 W 5950587.08 N 605669.66 E 18.965 -10199.88 14841 .13 90.920 348.030 8850.08 8938.19 8184.78 S 6251.24 W 5950620.19 N 605660.19 E 19.322 -10174.93 14873.33 90.310 355.040 8849.73 8937.84 8152.96 S 6255.98 W 5950651.94 N 605654.98 E 21.851 -10149.21 14902.54 90.370 359.970 8849.56 8937.67 8123.78 S 6257.25 W 5950681.09 N 605653.28 E 16.879 -10124.17 14936.66 89.510 6.190 8849.59 8937.70 8089.73 S 6255.42 W 5950715.17 N 605654.60 E 18.403 -10093.36 14968.62 89.140 12.120 8849.97 8938.08 8058.19 S 6250.34 W 5950746.78 N 605659.21 E 18.589 -10063.22 14997.91 88.890 17.950 8850.47 8938.58 8029.92 S 6242.74 W 5950775.16 N 605666.39 E 19.920 -10034.74 15030.22 89.820 24.420 8850.84 8938.95 7999.81 S 6231.07 W 5950805.44 N 605677.61 E 20.229 -10002.71 15061.71 90.120 31. 050 8850.85 8938.96 7971.96 S 6216.43 W 5950833.51 N 605691.84 E 21.076 -9971.24 15103.02 90.680 38.050 8850.57 8938.68 7937.96 S 6193.01 W 5950867.86 N 605714.74 E 16.999 -9930.19 15136.54 90.920 45.950 8850.10 8938.21 7913.07 S 6170.60 W 5950893.08 N 605736.78 E 23.577 -9897.63 15168.05 89.260 48.200 8850.05 8938.16 7891.61 S 6147.53 W 5950914.87 N 605759.53 E 8.873 -9867.77 15199.55 88.950 49.020 8850.54 8938.65 7870.79 S 6123.90 W 5950936.05 N 605782.84 E 2.783 -9838.20 15247.86 89.020 50.250 8851.40 8939.51 7839.50 S 6087.10 W 5950967.87 N 605819.18 E 2.550 -9793.16 15294.60 89.750 49.700 8851.90 8940.01 7809.45 S 6051.31 W 5950998.46 N 605854.52 E 1.955 -9749.68 15341 .15 89.630 50.680 8852.15 8940.26 7779.64 S 6015.55 W 5951028.79 N 605889.83 E 2.121 -9706.43 15391.42 88.580 52.550 8852.93 8941.04 7748.43 S 5976.16 W 5951060.58 N 605928.75 E 4.266 -9660.22 ~. 15438.80 89.690 54.710 8853.65 8941.76 7720.34 S 5938.01 W 5951089.24 N 605966.48 E 5.125 -9617.34 15486.62 90.980 55.580 8853.37 8941 .48 7693.02 S 5898.77 W 5951117.15 N 606005.30 E 3.254 -9574.61 15534.41 91.050 56.590 8852.52 8940.63 7666.35 S 5859.12 W 5951144.39 N 606044.56 E 2.118 -9532.27 15583.20 89.200 55.960 8852.42 8940.53 7639.27 S 5818.54 W 5951172.08 N 606084.73 E 4.006 -9489.12 15628.83 92.280 58.830 8851.83 8939.94 7614.69 S 5780.12 W 5951197.23 N 606122.78 E 9.225 -9449.19 15676.89 93.320 59.560 8849.48 8937.59 7590.10 S 5738.89 W 5951222.42 N 606163.64 E 2.643 -9407.93 15726.68 92.710 59.870 8846.86 8934.97 7565.03 S 5695.95 W 5951248.13 N 606206.20 E 1.374 -9365.42 15773.47 94.000 59.860 8844.12 8932.23 7541.58 S 5655.56 W 5951272.18 N 606246.24 E 2.757 -9325.55 15819.81 94.500 57.930 8840.69 8928.80 7517.71 S 5615.99 W 5951296.64 N 606285.45 E 4.291 -9285.70 15869.36 94.740 57.590 8836.70 8924.81 7491.36 S 5574.22 W 5951323.61 N 606326.83 E 0.838 -9242.63 15916.89 94.120 54.830 8833.03 8921.14 7465.01 S 5534.84 W 5951350.54 N 606365.81 E 5.935 -9200.69 15965.46 93.320 50.960 8829.87 8917.98 7435.77 S 5496.19 W 5951380.35 N 606404.02 E 8.120 -9156.57 15 November, 2002 - 9:08 Page 3 of 5 DrillQuest 3.03.02.004 Sperry-Sun Drilling Services j ~ Survey Report for PBU- WOA W Pad - W-38A MWD Your Ref: 500292180701 Job No. AKMW22164, BPXA North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) e/1 OOft) 16013.04 92.090 48.230 8827.63 8915.74 7404.97 S 5460.01 W 5951411.69 N 606439.74 E 6.287 -9112.24 16061.63 90.000 46.150 8826.74 8914.85 7371.96 S 5424.37 W 5951445.22 N 606474.88 E 6.068 -9066.23 16109.41 88.650 46.040 8827.30 8915.41 7338.83 S 5389.95 W 5951478.86 N 606508.81 E 2.835 -9020.70 16157.39 89.020 45.330 8828.28 8916.39 7305.32 S 5355.62 W 5951512.88 N 606542.63 E 1.668 -8974.88 16205.69 87.350 43.910 8829.81 8917.92 7270.96 S 5321.72 W 5951547.74 N 606576.02 E 4.537 -8928.51 ~ 16253.35 87.480 42.730 8831.96 8920.07 7236.32 S 5289.05 W 5951582.86 N 606608.17 E 2.488 -8882.49 16301 .17 87.350 42.640 8834.12 8922.23 7201.20 S 5256.67 W 5951618.46 N 606640.03 E 0.331 -8836.18 16348.96 87.850 44.260 8836.12 8924.23 7166.54 S 5223.83 W 5951653.60 N 606672.34 E 3.545 -8790.06 16397.20 85.630 46.000 8838.86 8926.97 7132.57 S 5189.70 W 5951688.08 N 606705.96 E 5.843 -8743.92 16433.89 86.680 49.270 8841.32 8929.43 7107.90 S 5162.66 W 5951713.15 N 606732.64 E 9.341 -8709.35 16490.94 86.670 49.700 8844.63 8932.74 7070.90 S 5119.36 W 5951750.78 N 606775.38 E 0.753 -8656.19 16538.20 86.800 50.260 8847.32 8935.43 7040.56 S 5083.22 W 5951781.66 N 606811.06 E 1.215 -8612.29 16585.76 85.630 49.870 8850.46 8938.57 7010.10 S 5046.84 W 5951812.66 N 606846.99 E 2.593 -8568.16 16634.91 87.420 51 .200 8853.44 8941.55 6978.92 S 5008.96 W 5951844.40 N 606884.39 E 4.534 -8522.70 16683.20 88.710 53.200 8855.07 8943.18 6949.34 S 4970.83 W 5951874.54 N 606922.08 E 4.926 -8478.52 16730.62 88.890 53.190 8856.06 8944.17 6920.94 S 4932.87 W 5951903.51 N 606959.62 E 0.380 -8435.46 16778.49 89.080 53.160 8856.91 8945.02 6892.25 S 4894.56 W 5951932.76 N 606997.50 E 0.402 -8391.98 16826.67 89.020 53.010 8857.71 8945.82 6863.32 S 4856.04 W 5951962.27 N 607035.58 E 0.335 -8348.18 16869.16 88.950 52.810 8858.46 8946.57 6837.69 S 4822.16 W 5951988.39 N 607069.08 E 0.499 -8309.50 16922.67 88.950 51. 980 8859.44 8947.55 6805.05 S 4779.77 W 5952021.66 N 607110.98 E 1.551 -8260.60 16970.03 89.940 51.860 8859.90 8948.01 6775.84 S 4742.49 W 5952051.42 N 607147.82 E 2.106 -8217.16 17017.16 90.250 51 .150 8859.82 8947.93 6746.50 S 4705.61 W 5952081.30 N 607184.26 E 1.644 -8173.78 17065.04 89.940 51.850 8859.75 8947.86 6716.70 S 4668.14 W 5952111.66 N 607221.29 E 1.599 -8129.72 ~ 17112.76 90.680 51 .720 8859.49 8947.60 6687.18 S 4630.64 W 5952141.73 N 607258.34 E 1.574 -8085.90 17152.77 90.860 51.290 8858.95 8947.06 6662.28 S 4599.33 W 5952167.10 N 607289.27 E 1.165 -8049.08 17209.14 91.110 48.650 8857.98 8946.09 6626.03 S 4556.18 W 5952203.98 N 607331.88 E 4.704 -7996.65 17256.93 90.490 49.61 0 8857.31 8945.42 6594.76 S 4520.04 W 5952235.79 N 607367.55 E 2.391 -7951.93 17305.14 88.650 49.600 8857.67 8945.78 6563.52 S 4483.33 W 5952267.57 N 607403.79 E 3.817 -7906.97 17354.07 86.310 47.930 8859.83 8947.94 6531.30 S 4446.57 W 5952300.33 N 607440.07 E 5.873 -7861.13 17400.73 85.070 47.690 8863.33 8951.44 6500.06 S 4412.10 W 5952332.09 N 607474.07 E 2.707 -7817.23 17449.58 82.840 46.490 8868.48 8956.59 6466.99 S 4376.52 W 5952365.68 N 607509.15 E 5.177 -7771 .19 17496.34 80.480 45.440 8875.26 8963.37 6434.83 S 4343.26 W 5952398.33 N 607541.93 E 5.514 -7727.07 17543.93 78.110 45.640 8884.10 8972.21 6402.08 S 4309.89 W 5952431.57 N 607574.81 E 4.997 -7682.37 17592.46 77.780 45.310 8894.23 8982.34 6368.80 S 4276.05 W 5952465.35 N 607608.15 E 0.951 -7636.99 17632.86 77.460 44.960 8902.90 8991.01 6340.96 S 4248.09 W 5952493.60 N 607635.70 E 1.159 -7599.19 15 November, 2002 - 9:08 Page 4 of 5 DrillQuest 3.03.02.004 Sperry-Sun Drilling Services Survey Report for PBU- WOA W Pad - W-38A MWD Your Ref: 500292180701 Job No. AKMW22164, North Slope Alaska Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) 17700.00 77.460 44.960 8917.47 9005.58 Local Coordinates Northings Eastings (ft) (ft) Global Coordinates Northings Eastings (ft) (ft) 5952540.66 N 607681.32 E 6294.59 S 4201.78 W All data is in Feet (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US). Vertical Section is from Well Reference and calculated along an Azimuth of 28.470° (True). Magnetic Declination at Surface is 25.874°(28-Sep-02) Based upon Minimum Curvature type calculations, at a Measured Depth of 17700.00ft., The Bottom Hole Displacement is 7568.14ft., in the Direction of 213.724° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 13297.35 13339.00 17700.00 8269.4 7 8294.98 9005.58 8179.69 S 8205.14 S 6294.59 S 5154.24 W 5175.13 W 4201.78 W Tie-on Point Window Point Projected Survey Survey tool program for W-38A MWD Fro m Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth (ft) (ft) Survey Tool Description 0.00 13297.35 0.00 13297.35 8269.47 17700.00 8269.47 AK-1 BP _HG - BP High Accuracy Gyro(W-38) 9005.58 MWD Magnetic(W-38A MWD) 15 November, 2002 - 9:08 Page 5 of 5 Dogleg Vertical Rate Section Comment (°/1 OOft) 0.000 -7536.34 Projected Survey i BPXA ""-' ..~ DrillQuest 3.03.02.004 ) ~Od~J91 18-Nov-02 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Well previously named W-38L 1 Re: Distribution of Survey Data for Well PBU_WOA W-38MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: 13,297.35' MD Window / Kickoff Survey 13,339.00' MD (if applicable) Projected Survey: 17,700.00' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment( s) RECEIVED NOV 19 2002 Alaska Oß & Gas Cons. Commi8lion And10rage To: Date: From: Subject: ) ) \IJ (;A- tOlt"! 0 l.. GPB Rotary Drilling Winton Aubert October 10, 2002 Mik Triolo, 564-5774 Well W-38Ll Migration to W-38a History Well History: Doyon 14 moved onto W-38 and was accepted on September 30th, 2002 at 22:00 hrs. The well was then killed by pumping a 100 bbl sized calcium carbonate pill required to seal off the existing perforations. The 4- %" tubing was then pulled from the well leaving a tubing stub at 13,720' MD. An attempt to retrieve the K- anchor from the production packer was made, failing due to the twist off of the collapsed tubing at -16' below the tubing stub. Several attempts were made to burn over the packer and retrieve it too try again to retrieve- the K-anehor, unsuccessfully. During the attempts 2 burn shoes and small sections of wash pipe were left down hole. The decision was made to abandon the deeompletion plan and give up production from the ,- motherbore and sidetrack out of the 9-%" casing into the Kingak. Several verbal conversations were had on October 8th and 9th explaining the issues and planned abandonment options. The plans submitted in this Sundry are as per those conversations. Please find attached a Sundry to abandon the perforations in the W -38 motherbore and the adjusted plan forward for finishing the W -38a sidetrack. Please do not hesitate to call with any questions regarding these adjustments. Sincere:ik Triolo ~ ~ BP Operations Drilling Engineer Doyon 14 ) Scope Change Summary Materials Needed Intermediate Section: . Amount. . 900' 20 each 1 assembly 1 each 1 each 1 each Production Liner: Amount. 3,700' 100 each 1 each 1 each Completion: Amount 14,000' 1 each 1 each 3 each 5 each 1 each 1 each 1 each As Contingency Surface and Anti-Collision Issues Greater Prudhoe Bay . "')38a Scope Change Well Plan Description 7" 26#, L-80, BTC-Mod Casing 7" Straight Blade Centralizers 4-Y2" Halliburton plug assembly 9-%" Halliburton Bridge Plug 9-%" x 7" ZXP liner top packer 9-%" WindowMaster Whipstock Description 4 Y2", 12.6#, L-80, IBT-Mod Slotted Liner 4 Y2" x 5 3,4" x 8" Straight Blade Centralizers 4- Y2" Baker guide shoe 4-¥2" x 7" HR ZXP with flex lock hanger Description 4 Y2" 12.6 Ib/ft, 13Cr-80, V AMACE tubing Baker 9-Cr S-3 Packer 7" X 4- Y2" Halliburton 4-Y2" XN-Nipple (3.725" 10) Halliburton 4-Y2" X-Nipple (3.813" 10) Cameo 4-Y2" X 1-Y2" MMG Gas Lift Mandrels Cameo 4- Y2" X 1" KBG-2 Gas Lift Mandrels 4-Y2" WLEG 4-%", 5m Cameron Tree Surface Shut-in Wells: Evaluate W-37 & W-39 for the rig move on & off W-38 for possible shut-in requirements. . If the well house needs to be removed from an adjacent well, then the well needs to be shut-in prior to the move. Close Approach Wells: There are NO close approach wells associated with this profile. Well Name Current Status N/A N/A Production Priority N/A Well Control Precautions N/A Well control equipment consisting of 5,000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3,500 psi. Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. Production Section- Maximum anticipated BHP: 3,650 psi@ 8,800' TV~. s - Ivishak Maximum surface pressure: 2,770 psi @ surface (based on BHP and a full column of gas from TD @ 0.10 psi/ft) Planned BOP test pressure: 3,500 ps((the 9-%" & 7" casing will be tested to 3,500 psi) Planned completion fluid: Estimated 8.6 ppg Seawater I 6.8 ppg Diesel . . . . BOPE Rating 5,000 psi Working Pressure (entire stack and valves 2 Planned BOPE Test Pres. 3,500/250 psi Rams & Valves 2,500/250 psi Annular Scope Change Version #1 10/10/02 ') Greater Prudhoe Ba'- -)38a Scope Change Well Plan Disposal . NO ANNULAR INJECTION ON THIS WELL. No annular injection in this well. Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at D8-04. Any metal cuttings will be sent to the North Slope Borough. Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to D8-04 for injection. Haul all Class I waste to Pad 3 for disposal. . . . Mud Pro~ram 9-0/8" Window Milling Mud Properties: Density (ppg) Plastic vis 11 .2 12 - 15 8-¥2" Drilling Mud Properties: Density (ppa) Plastic vis 11.2 /' 13 - 20 YP 15 - 25 I L8ND HTHP PH TauO Viscosity <10 9.0 - 9.5 6-9 55 - 70 I L8ND HTHP PH TauO Viscosity <8 9.0 - 9.5 3-7 45 - 55 I Low Density Quickdril LSRV pH MBT API FI <12,000 cp 8.5 - 9.0 <3 N/C YP 25 - 35 6 Va" Production Hole Mud Properties: Density (ppg~ Plastic vis YP 8.5 - 8.5 4 - 7 22 - 26 NOTE: See attached Baroid mud recommendation LCM Restrictions: Follow the attached LCM Decision Tree Formation Markers Formation Tops 1t MD 1t TVDss ft TVD Pore psi EMW (ppg) Hydrocarbons Base H RZ 6,893 Base Miluveach 6,932 Top Kingak D 13,300 8,180 KOP 13,400 8,244 8,332 Top Sag River 14,077 8,642 8,730 Top Shublick 14,102 8,657 8,745 TElL 14,339 8,750 8,838 T8ADrrZ4B 14,437 8,782 8,870 3,653 8.0 Yes 45N 14,526 8,807 8,895 3,664 8.0 Yes 44N 14,611 8,825 8,913 3,671 8.0 Yes 43N 15,124 8,845 8,933 3,680 8.0 Yes Land 15,734 8,880 8,968 3,694 8.0 Yes TD 17,584 8,950 9,038 3,723 8.0 Yes CasinglTubing Program Hole Size Csgl WtlFt Grade Conn Length Top Bottom Tbg O.D. BTC-MO~ MD I TVDrkb MD I TVDrkb 8-V2" 7" Casing 26.0# L-80 877' 13,200' / 8,214' 14,077' / 8,730' 6%" 4 Y2" Slotted 12.6# L-80 IBT 3,908' 13,977' /8,680' 17,584' / 9,038' Tubing 4 Y2" GL 12.6# 13Cr-80 VAMACE 13,966' 34' / 34' 14,000' / 8,685' 3 Scope Change Version #1 10/10/02 ) Greater Prudhoe Ba~' ''''138a Scope Change Well Plan ,# Cement Calculations CasinQ Size 17" 26 Iblft L-80 BTC-M - Single Stage Basis I 50% excess - TOC: 13,000' MD, Bottom of Cement 14,077' MD Total Cement Volume: Wash None Spacer 20 bbls of Viscosified Spacer (Mudpush XL Design) Weighted to 12.5 ppg Tail 46 bbls 68 15.8 Class G 1.53 ft3/sx '/ Temp BHST ::= 225° F from SOR, BHCT 155° F (use actual temps recorded by MWD @ TD) 7" Liner Centralizer Placement a) Run one straight blade rigid centralizer per joint with no stop collar (i.e. free floating across the whole length of the joint) for the whole string. This strategy will be revisited during and after the drilling of the intermediate hole. Do not run any centralizers in the liner lap. 4 V2" Slotted Liner Centralizer Placement a) Run one straight blade rigid centralizer per joint with no stop collar (i.e. free floating across the whole length of the joint) for the whole string. This strategy will be revisited during and after the drilling of the production hole. Survey and Logging Program 8 V2" Hole Section: MWD I GR I PWD 6 %" BHA #1 : MWD I GR I PWD I ABI 6 %" BHA #2: MWD I GR I Res I PWD I ABI Cased Hole: None Bit Recommendations BHA Number 1 2 3 Hole Size and Section 8 V2" 6%" 6%" Depths (MD) Bit Type Nozzles K-Revs Hours 13,400' - 14,077' 14,077' - 15,082' 15,082' -17,584' Smith rerun S-73 or S-88 Smith XR20HTDGPS Smith MDT52SVYPX 8 x 12 3 x 15 6 x 11 Motors and Required Doglegs BHA# Motor Size and Motor Required Flow RPMs Rate 1 7" Sperydrill 7/8, 6.0 stg, FTC Performance motor with 450 -550 80-1 00 adj bend housing @ 1.5° wI 8.25" concentric sleeve gpm 2 4 %" Sperrydrill 7/8, 2.0 stg, Ultra slow speed motor, adj 250-275 1 0-40 bend housing @ 1.83° wI 5.78" concentric sleeve & ABI gpm 3 4 %" Sperrydrill 4/5, 6.3 stg, performance motor wI 1.5° 250-275 60-80 adj bend housing wI 5.75" concentric sleeve & ABI gpm Required Doglegs Maximum build: 5.0°/100' Maximum build: 17.5°/100' Maximum build: 11.0°/100' 4 Scope Change Version #1 10/10/02 ) Greater Prudhoe 8a"")38a Scope Change Well Plan Scope Change Plan Forward Scope of Work Ria Operations: /' 1. MU clean-out BHA with 5" DP and flat bottom mill I String Mill 9-%" Scraper. RIH -50' below the 9-%" BP setting depth, -13,400' MD and circulate and condition wellbore as required. Pump hot oil to remove excess paraffin if needed. POOH 2. RU Schlumberger E-line, make GR/JB run, GR/JB/GR/CCL run and set BP if able @ :t13,420' MD. It may be necessary to run BP on DP depending on how clean the GR/JB's come back. 3. Bleed down 13-%" X 9-%" annulus and ensure there is ° press~ on the packoft. 4. Change 13-%" x 9-%" packoff. Test the 9-%" casing to 3,500 psi for 30 minutes. Monitor the outer annulus for any increases in pressure on top of the normal increase due to ballooning effects. / 5. PU 9-%" whipstock assembly. Set the whipsock on the BP such that the top of the whipstock is at -13,400'MD. Orient whipstock to 60° right of highside. Mill window in 9-%" casing at :t 13,400' MD. Perform FIT to 12.5 ppg EMW. POOH 6. RIH with 8-%" drilling assembly (with MWD/GR/PWD) to whipstock. Directionally drill to 8- %" TD. Planned TD is 14,077' MD I 8,730' TVD, top of Sag River formation../ /... 7. Run and cement a 7",26# L-80 intermediate liner. Release from the liner. Circulate and condition well to clean up any cement above the liner top packer. POOH. 8. RIH with 6-%" drilling BHA #1 with a 1.83° motor and Smith XR20 (with MWD/GR/ABI/PWD) to 7" casing float collar. PU 4" DP as needed. Drill shoe track and displac~ver to new 8.5 ppg Low Density Quickdril fluid and drill 20' of new formation. Perform FIT to 9.7 ppg EMW. 9. Drill the 6-%" production hole as per directional plan to the end of the build and turn section at approximately :t15,082' MD. Condition hole as needed. POOH for BHA I bit change. 10. RIH with 6-%" drilling BHA #2 with a 1.50 motor and Smith MDT52 (with MWD/GR/Res/ABI/PWD) to :t,15,082' MD. MAD pass the previously drilled section while running in the hole. Circulate and condition mud. /" 11. Drill the 6-%" production hole as per directional plan to TD at approximately :t17,584' MD/Condition hole as needed. POOH. 12. Run and cement a 4-Y2", 12.6# L-80 slotted production liner. Release from the liner. Displace well to clean brine and or seawater above the liner top packer. POOH. 13. Run a 4-%", 12.6# 13Cr-80 Vam ACE completion tying into the 4-%" liner top packer. 14. Set packer and test the tubing to 3,500 psi and annulus to 3,500 psi for 30 minutes. 15. Nipple down the BOPE. Nipple up and test the tree to 5,000 psi. 16. Freeze protect the well to -2,000' TVD and secure the well. Rig down and move off. Post-Ria Work: 1. MIRU slickline. Pull the ball and rod I RHC plug from IX' nipple below production packer. 2. Pull out RP shear valve from bottom GLM. 3. Install gas lift valves. 4. Perform 13-%" X 9-%" annulus down squeeze. 5 Scope Change Version #1 10/10/02 TREE: 4-1/16" - 5M CIW L-80 WELLHEAD: 135/8" - 5M McEvoy 13-3/8",72 #/ft, L-80, BTC I 2,976' I .. Window Milled from Whipstock Top of Window at +1-13,400' MD Bridge Plug set at +1-13,425' MD Fish consist's of mangled twisted tubing stub, 2 burnshoes with ------- potential sections of wash pipe, and rest of original completion run in 1992. Estimated Top of fish +1-13,739' MD. . ~ 7" Liner Top at 113,879' 1 II ~ 9-518",47 #/ft, L-80, BTC 114,139'1 ~ ~ =:? .......:::;: 7",26 #Ift, L-80, IJ4S I 14,850' I W-38A Scope Change Completion Cellar Elevation:::; 53.21' Doyon 14 RKB:::; 88.11' Original RKB:::; 90.76' 4-1/2" 'X' Landing Nipple with 3.813" seal bore. 1 2,125' .. 4-1/2" 12.6# 13Cr-80 Yam Ace Tubing with GLM's GAS LIFT MANDRELS MD Size 4,000' 1-1/2" 8,400' 1-1/2" 11,200' 1-1/2" 11,900' 1-1/2" 12,800' 1-1/2" 1 Jt above pkr' 1 " ~ Valve Type RP Shear DV DV DV DV DV ---- 6 5 4 3 2 1 1 +1-13,200' I BAKER 7" x 9-5/8" Tie Back Sleeve ZXP Liner Top Packer 'Flex Lock' Hydraulic Liner Hanger / 4-1/2" 'X' Landing Nipple with 3.813" seal bore. 7" x 4-1/2" Baker 'S-3' Production Packer 4-1/2" 'X' Landing Nipple with 3.813" seal bore. 4-1/2" 'XN' Landing Nipple with 3.725" seal bore. 4-1/2" WireLine Entry Guide stabbed into 4-1/2" liner tie-back sleeve. I +/-13,977' I .~ . r; ... ~ ;;;;:: ==- Comments Date 10/09/02 Rev By MikT PRUDHOE BAY UNIT WELL: W-38A API NO: 50-029-21807-01 Proposed Completion Fill GPB Drilling & Wells SpBf""r"'Y-SUi! ' North Slope Alaska trAJ.J...J,,. N:C!-.>~ e~Yi~ BPXA A H.II¡b~(1,1O eomp."!t -6300 - -6900 - ,.... (j) ~ -7500 - C/) 0> s::: :c t 0 Z -8100 - -8700 - - õ 0 CD II ..c: u .~ J!,? -9300 - en u (f) n~\II_.. - ~~ n ,..,.. ,..n ,.."'... Well: Current Well Properties W-38A WP10 Horizontal Coordinates: Ref. Global Coordinates: Ref. Structure Reference: Ref. Geographical Coordinates: RKB Elevation: 5958897.05 N, 611789.00 E 1674.82 N, 1898.72 E 70017' 47.9825" N, 149005' 41.1160" W 88.11 ft above Mean Sea Level 88.11 ft above Structure Reference North Reference: Units: True North Feet (US) End Dir, Start Sail @ 77.280° : 17438.73ftMD,9006.28ftTV W-3M T 4 8981.1. 11 It rVD --....--.....-... 6560.51 S. 4522.08 W Begin Dir @ 6.0000/100ft: 17226.67ft MD, 8982.88ft TV End Dir, Start Sail @ 86.330° : 15284.35ftMD,8939.31ftTVD Decrease in Dlr Rate @ 8.0000/100ft: 15123.78ft MD, 8933.11ft TVD W-36A Tib S933.11ft TVO B041Al S. 1:>149.29 W ~ ., Begin Dir @ 14.0000/100ft: 15123.34ftMD, 8933.10ft TVD ~'~'''.'' End Dlr, Start Sail @ 89.257° : 15082.53ftMD,8932.58ftTVD . < : W-S8A Hee! . H921.U 1ft TVO 8375.55 S. 0214.27 IN PBU_WOA W Pad W-38A WP10 Dril/Quesl- W-38A Fault a q.. 4: .~ .' ." W-38A WP10 Proposal Data Vertical Origin: Well Horizontal Origin: Well Measurement lJnits: It North Reference: True North Dogleg severity: Degrees per 100 feet (US) Vertical Section Azimuth: 25.230. Vertical Section Description: Well Vertical Section Origin: 0.00 N.O.OO E Measured Incl. Azim. Vertical Northings Eastings Vertical Dogleg Depth Depth Section Rate 13400.00 52.753 219.411 8332.08 8242.56 S 5205.87 W -9675.26 13420.00 53.981 221.981 8344.01 8254.72 S 5216.33 W .9690.73 12.000 13835.10 53.980 248.020 8590.89 8444.47 S 5487.33 W .9977.89 5.058 14071.85 53.980 248.020 8730.11 8516.14 S 5664.89W -10118.41 0.000 14091.84 53.980 248.020 8741.87 8522.19 S 5679.89 W -10130.28 0.000 14180.57 69.506 247.790 8783.75 8551.51 S 5752.08 W -10187.57 17.500 14242.38 69.506 247.790 8805.39 8573.39 S 5805.68 W -10230.21 0.000 14766.99 89.250 340.000 8928.11 8375.55 S 6214.27 W -10225.40 ...mgg ~' 15082.53 89.257 35.540 8932.58 8075.03 S 6173.26 W -9936.08 15123.34 89.257 35.540 8933.10 8041.82 S 6149.54 W -9895.93 0.000 15123.78 89.260 35.600 8933.11 8041.47 S 6149.29 W -9895.50 14.000 15284.35 86.330 48.118 8939.31 7922.21 S 6042.46 W -9742.08 8.000 15937.93 86.330 48.118 898 Ll5 7486.77 S 5556.85 W -9141.19 0.000 15999.13 90.000 48.000 8983.11 7445.90 S 5511.36 W -9084.82 6.000 16000.43 90.000 47.922 8983.11 7445.03 S 5510.40 W -9083.62 6.000 16408.93 90.000 47.922 8983.11 7171.28 S 5207.19 W -8706.75 0.000 16410.23 90.000 48.000 8983.11 7170.41 S 5206.23 W .8705.55 6.000 16415.00 90.016 48.286 8983.11 7167.22 S 5202.68 W -8701.15 6.000 17226.67 90.016 48.286 8982.88 6627.12 S 4596.79 W -7954.32 0.000 17326.94 84.000 48.270 8988.11 6560.51 S 4522.08 W -7862.22 6.000 17438.73 77.280 48.272 9006.28 6487.14 S 4439.81 W .7760.77 6.011 17583.28 77.280 48.272 9038.11 6393.28 S 4334.57 W -7631.02 0.000 ST Exit: Dir @ 12.0000/100ft, 60.00° Right TF : 13400.00ft MD, 8332.08ft TVD Begin Dir @ 5.058°/100ft: 13420.00ft MD, 8344.01ft TVD End Dlr, Start Sail @ 53.980° : 13835.10ftMD,8590.89ftTVD Begin Dir @ 17.5000/100ft: 14091.84ft MD, 8741.87ft TVD End Dir, Start Sail @ 69.506° : 14180.57ftMD,8783.75ftTVD Begin Dir @ 17.5000/100ft: 14242.38ft MD, 8805.39ft TVD I I -7800 -7200 Scale: 1 inch = 600ft W-38A Fault 1 I I -6000 -5400 Eastings(Well) I -4800 I -6600 I -4200 Reference is True North sf:Jel""'i'Y-su" North Slope Alaska Þ-fUb.-Ç1NG'S e~Y~l£U BPXA þ, H~mb..rt"n C<>"'P~'Y Vertical Origin: Horizontal Origin: Measurement Units: North Reference: Well Well ft True North W-38A WP10 Proposal Data Dogleg severity: Degrees per 100 feet (US) Vertical Section Azimuth: 25.2300 Vertical Section Description: Well Vertical Section Origin: 0.00 N,O.OO E ~Q !b~ fI,~ ~ 'b ~' f:>~ f:>~ ,,# ~Q ~« '. .ç ~ ~Q ~,,~ 0 ~<s .A:::- - þÞ< 1::;1::; ~ 'bY)' 'b";;!:)' ~ t,<f>' ~Q' ~'!' ~Q "",,~~ ~Q~ ~$' ri-\,,<;$. ~Q ~~Q .¡:. - ~ ,,~ -""~ ~ ",,~ ,,~ ,,-"5 ~, ~. ':":1 ,,'" lb' ~ ~~ ~ ~ ~ ~ ~Q 6,<C>' 'i!:-~ ",,:>'b f:>~' ~~ t§'~ .Jlo,.~ ~Q t§' ~ ~~Q ~ ~~Q ~:~ ~~Q t-~ 'i!:- 'b ~ '. /\0<;$ q ~, ~. 'i!:- ~,'" ~ ,,'" ~ ,,'" .Jlo,. ~ ,,:>OJ ~Q' sf:I'" !b~ i,\~' ~~ fI,~ ,,<;$ ~ A'> ,,"5 ~. ,,'" ~. tp'O' ~. 'b'bl::;"" ~~ "~ ~~ "'~") e¡,~<# 'i>9I0j ~,!?OJ"ó 'bOJ":>":>' f':>~'b~ ~,'5 'bOJ'b'" ~,!?Oj 'bOJ<G" ~,!?Oj 'bOJ'" ~f ~~Q' """,,<8> /\o<;;)$' ~~ <f~ ,$ofò ",,,:>~~ ~~Q' "~".,, ":>~~~ ~' ~~~ ~Q' <;;)$'~ ~Q' ,,-,,:>~~ ~Q t§J 0'. ri-\ r.:- ',$' ~. {}-' ~ ~"~' OJ":>~ !:)<§>' OJ":>~ """",. ~~ "".t}>. ",,~ ~.". "'~ ~ ~ e¡,-:Ji <lJrIS ot-rSi ,,~<;$ ,,<0" \"t§5 ,,~~ ~. "fò .""t$'. "fò (I;~' ,,'I; f:>":>'b' 8400 - "~ ~ 'óOJ' ~ " <:l" '0<;;)1::; !\" .."'0 <S>~ g.~" . ,,~OJ ri-" . "oq /\or;," ß ~" ~~ I::;$' ~ <f «,~~ ~. A1' <;;)$' ~ 'b' <6>' S§-. <f>~ #'. t;f>~ 'ò:>$" ~ 'P !b~~ 0\'" r.:- ::..~ 100.00 ø ~ ~ CO 0\'" ~ø ~ ot-<;$ ~ o~ ~ o~ ~ g."P ",<S> e¡,-:Ji <lJrIS ~~ ~ I::;<S> q;.'b' ~ <s>'ò:> ~ f§I'ò:> ~ <§>I::; ~ ~4' ~. .~, ~ ,.,ra """. Q~ r.:-ra '0' r.:- '0' r.:-ra '0' r.:-ra .." ~ q ./ ~ v ,g.- ~ .~!!.'b' ~.g ~ .g ~ .g i$' ~ ~~ 7" Casing ø~ c¡j ()~ ø" c¡j Q~ c¡j Q~ c¡j ()~ c¡j <!'q ',$' q 000.00 14071.85ft MD ~" ~r ::..~ ~t§> ()~' ::..~ b()~' ::..~. bil"::..~ bil" ~~ ð.,rIS .~,"=~ ~&~. ~......f!l...~ ~~-...'~~- ~~ _.A..°____.TSGRS73IUHITVD -::::::::::3'!:~..::::.;;::::::::::::::::::;;::: = - - - =- ===.---- Y-- "'= --= .---___===n____. = -- -- - - -- ... -TSHU, 8745.111tTVD 8800 -.00 TEll, 8i13S.11It TVD ~~ ~~ ~~ ~~~~~~~~~~~~~~~[ - - - - - ~ - - - - - ~ - - - - - - - - - - - L- - - - - - -f- - - - - - W-38~ ~p~ - - ~ - - OOWC,9Q3I:U11ITVO / I !! // 4 1/2" Liner í ¡ ! i // ¡ 17583.28ft MD í! / j // \ 9038.11ftTVD w<omÅ f{ÐêJ! W'3ðA T1b , !. ,. w.3sk T3 w..$á H 8928.: 1ft TV!) a::~~ftT ~~D 8083.1Ht ivo 8988.11ftTVD 8375.55 5. 6214.27 VI . l170.41 S, fi206.23 IN 656051 S, 4522,i'}8 W Measured Depth 1."".00 I.' .1).00 I... 1:'10 1.''':1.85 I.J".".84 1~1>1).57 I~:" :.38 I~ ¡'.".99 I..'" .'..53 1 .1: '34 1.1: '.78 1 ..:'J..35 1 .." /.93 1''''''.'.13 1-.' ..1.43 1,.J"~.93 1.." 11).23 I,." 1.;.00 1 ¡: :'..67 1 ¡ ':'..94 I 'J ':<.73 1 ¡ -':.:..28 .- Q) ~ ..c: ..... c.. Q) 0 (ij 0 .- .t= to Q)O >'<t II .!: (,) .S ~~oo- ID ~ (,) W ""'-=""'..--.L"''''''''''''' 1"'\1"\'" Ind. 52.753 53.981 53.980 53.980 53.980 69.506 69.506 89.250 89.257 89.257 89.260 86.330 86.330 90.000 90.000 90.000 90.000 90.()J 6 90.()J 6 84.000 77.280 77.280 219.41 ] 221.98] 248.020 248.020 248.020 247.790 247.790 340.000 35.540 35.540 35.600 48.118 48.118 48.000 47.922 47.922 48.000 48.286 48.286 48.270 48.272 48.272 ~~ Vertical Depth 8332.08 8344.oJ 8590.89 8730.1 ] 8741.87 8783.75 8805.39 8928.11 8932.58 8933.10 8933.11 8939.31 898 Ll5 8983.11 8983.11 8983.11 8983.11 8983.11 8982.88 8988.11 9006.28 9038.]1 ~~~ 8242.568 8254.72 8 8444.47 8 8516.148 8522.198 8551.518 8573.398 8375.55 8 8075.03 8 8041.82 8 8041.47 $ 7922.21 8 7486.77 $ 7445.90 $ 7445.03 $ 7171.28$ 7170.418 7167.22 $ 6627.12 $ 6560.51 $ 6487.14 $ 6393.28 $ I I -11000 -10600 Scale: 1 inch = 400ft Eastings .:,. ..87W : 1,..33 W .J>'!.33W "'''¡.89W ""'.89W .'..:.08W ..".'.68W ,.:IJ..27W '.I.'.26W '.IJ".54 W '.IJ.'.29W '."J:A6W .. .'..85W .1'.36W .. . '''.40W . :IL.J9W .:"'..23 W .:":.68 W ~'."..79W ~ .::.08W ,J.J"'.81 W ~. 'J..57W I -10200 Vertical Section -9675.26 -9690.73 -9977.89 -10118.41 .]0130.28 -10187.57 -10230.21 .10225 AO .9936.08 -9895.93 -9895.50 -9742.08 -9141.19 .9084.82 -9083.62 -8706.75 -8705.55 .8701.15 .7954.32 .7862.22 .77(i).77 .7631.02 Dogleg Rate 12.000 5.058 0.000 0.000 17.500 0.000 17.500 17.(i)0 0.000 14.000 8.000 0.000 6.000 6.000 0.000 6.000 6.000 0.000 6.000 6.011 0.000 I -9800 PBU_WOA W Pad DrillQuest^ W-38A WP10 Current Well Properties Well: W-38A WP10 Horizontal Coordinates: Ref. Global Coordinates: Ref. Structure Reference: Ref. Geographical Coordinates: RKB Elevation: 5958897.05 N, 611789.00 E 1674.82 N, 1898.72 E 700 17' 47.9825" N, 1490 05' 41.1160" W 88.11 ft above Mean Sea Level 88.11ft above Structure Reference North Reference: Units: True North Feet (US) "-' .~ 9038.11ft TVO 63$3.28 S, 4334.57 W I I -9400 -9000 Vertical Section (Well) I -8600 I I I -8200 -7800 -7400 Section Azimuth: 25.230° (True North) ) ') ~e~~!:)!~~~1J North Slope Alaska PBO_WOA W Pad DrillQuesl" [J-~~I..,_L.!~~~A~ï~b:'~-¿;iÌÏ~;: BPXA W-38A WP10 W-38A WP1 0 Target Data Measurement Units: ft Target Coordinate Vertical Depth Northings Eastings Vertical Depth Northings Eastings Target Name Point Type TVD Well Well SSTVD ASPy ASP X Shape (ft) (ft) (ft) (ft) (ft) (ft) W-38AFault 1 Entty Point 88.11 8634.57 S 6618.16 W 0.00 5950165.00 N 605300.00 E Polygon Boundary Point A 88.11 8634.57 S 6618.16 W 0.00 5950165.00 N 605300.00 E B 88.11 9404.88 S 5594.51 W 0.00 5949410.00 N 606335.00 E C 88.11 8634.57 S 6618.16 W 0.00 5950165.00 N 605300.00 E W-38AHeel Entry Point 8928.11 8375.55 S 6214.27 W 8840.00 5950430.00 N 605700.00 E Polygon Boundary Point A 8928.11 8274.07 S 6312.77 W 8840.00 5950530.00 N 605600.00 E B 8928.11 8277.04 S 6112.79 W 8840.00 5950530.00 N 605800.00 E C 8928.11 8477.02 S 6115.76 W 8840.00 5950330.00 N 605800.00 E D 8928.11 8474.05 S 6315.74 W 8840.00 5950330.00 N 605600.00 E W-38A Fault 2 Entty Point 8908.16 8049.09 S 6309.42 W 8820.05 5950755.00 N 605600.00 E Polygon Boundary Point A 8908.16 8049.09 S 6309.42 W 8820.05 5950755.00 N 605600.00 E B 8908.16 8063.94 S 5983.61 W 8820.05 5950745.00 N 605926.00 E C 8908.16 8049.09 S 6309.42 W 8820.05 5950755.00 N 605600.00 E W-38A Tlb Entry Point 8933.11 8041.47 S 6149.29 W 8845.00 5950765.00 N 605760.00 E Polygon Boundary Point A 8933.11 7940.00 S 6247.79 W 8845.00 5950865.00 N 605660.00 E B 8933.11 7942.97 S 6047.81 W 8845.00 5950865.00 N 605860.00 E C 8933.11 8142.95 S 6050.79 W 8845.00 5950665.00 N 605860.00 E D 8933.11 8139.98 S 6250.77 W 8845.00 5950665.00 N 605660.00 E W-38AFault 3 Entty Point 8921.35 7703.67 S 6066.26 W 8833.24 5951104.00 N 605838.00 E Polygon Boundary Point A 8921.35 7703.67 S 6066.26 W 8833.24 5951104.00 N 605838.00 E B 8921.35 7946.84 S 5787.84 W 8833.24 5950865.00 N 606120.00 E C 8921.35 7703.67 S 6066.26 W 8833.24 5951104.00 N 605838.00 E W-38A Fault 4 Entry Point 8951.86 7451.90 S 5780.48 W 8863.75 5951360.00 N 606120.00 E Polygon Boundary Point A 8951.86 7451.90 S 5780.48 W 8863.75 5951360.00 N 606120.00 E B 8951.86 7579.88 S 5446.35 W 8863.75 5951237.00 N 606456.00 E C 8951.86 7451.90 S 5780.48 W 8863.75 5951360.00 N 606120.00 E W-38A T2b Entty Point 8983.11 7445.90 S 5511.36 W 8895.00 5951370.00 N 606389.00 E Polygon Boundary Point A 8983.11 7344.42 S 5609.86 W 8895.00 5951470.00 N 606289.00 E B 8983.11 7347.40 S 5409.88 W 8895.00 5951470.00 N 606489.00 E C 8983.11 7547.37 S 5412.86 W 8895.00 5951270.00 N 606489.00 E D 8983.11 7544.40 S 5612.84 W 8895.00 5951270.00 N 606289.00 E W-38AFault5 Entry Point 8966.92 7269.71 S 5522.74 W 8878.81 5951546.00 N 606375.00 E Polygon Boundary Point A 8966.92 7269.71 S 5522.74 W 8878.81 5951546.00 N 606375.00 E B 8966.92 7471.93 S 5307.73 W 8878.81 5951347.00 N 606593.00 E C 8966.92 7269.71 S 5522.74 W 8878.81 5951546.00 N 606375.00 E W-38A T3 Entty Point 8983.11 7170.41 S 5206.23 W 8895.00 5951650.00 N 606690.00 E Point W-38AT4 Entty Point 8988.11 6560.51 S 4522.08 W 8900.00 5952270.00 N 607365.00 E Point W-38ADD'sPoly @ 80% Entty Point 9038.11 6393.28 S 4334.57 W 8950.00 5952440.00 N 607550.00 E Polygon MWD+IFR+MS Boundary Point A 9038.11 8567.80 S 5862.09 W 8950.00 5950243.00 N 606055.00 E B 9038.11 8420.16 S 6038.91 W 8950.00 5950388.00 N 605876.00 E C 9038.11 8369.60 S 6076.16 W 8950.00 5950438.00 N 605838.00 E D 9038.11 8253.33 S 6093.43 W 8950.00 5950554.00 N 605819.00 E E 9038.11 8133.79 S 6061.65 W 8950.00 5950674.00 N 605849.00 E F 9038.11 8021.85 S 6056.99 W 8950.00 5950786.00 N 605852.00 E G 9038.11 7135.72 S 51l7.70W 8950.00 5951686.00 N 606778.00 E H 9038.11 6410.52 S 4318.83 W 8950.00 5952423.00 N 607566.00 E I 9038.11 6367.96 S 4356.20 W 8950.00 5952465.00 N 607528.00 E J 9038.11 7095.19 S 5153.10 W 8950.00 5951726.00 N 606742.00 E K 9038.11 7961.84 S 6124.10 W 8950.00 5950845.00 N 605784.00 E L 9038.11 8021.50 S 6215.00 W 8950.00 5950784.00 N 605694.00 E M 9038.11 8244.11 S 6242.31 W 8950.00 5950561.00 N 605670.00 E N 9038.11 8476.88 S 6259.78 W 8950.00 5950328.00 N 605656.00 E 0 9038.11 8629.25 S 6236.04 W 8950.00 5950176.00 N 605682.00 E P 9038.11 8872.62 S 5809.61 W 8950.00 5949939.00 N 606112.00 E W-38A Geo Poly Entty Point 9038.11 6393.28 S 4334.57 W 8950.00 5952440.00 N 607550.00 E Polygon Bound:uy Point A 9038. II 6248.65 S 4308.62 W 8950.00 5952585.00 N 607573.80 E B 9038. II 8013.35 S 6291.79 W 8950.00 5950791.00 N 605617.lOE C 9038.11 8624.28 S 6300.88 W 8950.00 5950180.00 N 605617.lOE D 9038.11 8950.78 S 5866.68 W 8950.00 5949860.00 N 606056.10 E E 9038.11 8760.99 S 5448.01 W 8950.00 5950056.00 N 606471.90 E F 9038.11 8581.67 S 5602.36 W 8950.00 5950233.00 N 606314.90 E G 9038.1] 8638.76 S 5731.23 W 8950.00 5950174.ooN 606186.90 E H 9038.11 8418.37 S 6024.48 W 8950.00 5950390.00 N 605890.40 E I 9038.11 8064.45 S 6016.42 W 8950.00 5950744.00 N 605893.20 E J 9038.11 6375.37 S 4194.19W 8950.00 5952460.00 N 607690.10 E W-38A Fault 6 Entry Point 88.11 5784.19 S 4403.52 W 0.00 5953048.00 N 607472.00 E Polygon Boundary Point A 88.11 5784.19 S 4403.52 W 0.00 5953048.00 N 607472.00 E B 88.11 6229.60 S 3640.06 W 0.00 5952614.00 N 608242.00 E C 88.11 5784.19 S 4403.52 W 0.00 5953048.00 N 607472.00 E DrillQuest 3.03.02.002 Spek,'y-Sun Drilling St::'Nices Proposal Data - W-38A WPS - W-38A WP10 001 = 6.6 Approved Plan MD Delta Inclin. Azimuth TVD Delta Northings Eastings Dogleg A. Build A. Tum Toolface V8 (25°) (It) MD (ft) (°) (°) (It) TVD (ft) (ft) (It) (0/100ft) (o/lOOft) (o/lOOft) (°) (ft) ......=.~....::.. .:....:::~::~~g~;~2:[.. ..... ........... 5?:.!.?.:. -. ..: ?_~.~ ~~.~. .:......~.?~?.:.9.~: .............. ...~.?4..?:~.~~ ..$L....~.?.9.?..:.~!YY :...:.. ......... .. .~~.?!.~:.~ 2.......... ........~..~~.?g:g~...... ....... .?~:.~g;... .....~~.:.~~:. ..... .?21 '.~.~.:..... 8.~¥:.~.~;. ... .... ..1...~. :~~L. ..~.??.~.: !.?.~.'......?.?..~..§.:.~~..YY :............... ..1..?.:.9.~.; ...... ...............?:.~..~. ...................~..?:.~?. L.............. 60.00. .. ~~?~o...!. ....~.........:.. ....~..~~~~:..1..9....... .....~.1..?:.~.~; -.- .~~:~.~ i. . _....?.4..~'.~.~:. 8590 :.~~: ?~?.~~.~.Lß.~~.~~ ?...~.~..... ~.~~!..:_3.~. "Y..:......... ......~.:.C>§.;... ..................9.:9..9.. ................... ?:.??L ............... ~.?:.!.?; -9.9.7.7.. ~ ~.".. ......... ...1. '!9..?.~. :8~.. .?.~§.:.!.~............~~.:.~.~........... ..~.~~:.9..?L.. .~.!.~~.:.~...~..L.... ....~..39.22.:. 8?~..6..~ 1..~ ..~.:......~.??~.:.~~.YY.:.. . ..... 0.00: 0.00 ..............9..:.99..1.......... ~:~q!. -.1..o..~ 1.8.4 5' :.._.~-,!~~-~..:.~~_.._._..._?~:~g~_...._?_~:.~~.~-_..-?~-~:g~L_~!.~_!_:~21.__.__-_!_~.~?? :...._~.??~.:~..~-~:__..~.~2~~_~_~_:_------~..:9.~j._-_..._...._~:..<?.~- _._--_.__...g:~.l..___...__..__.9..:9...~.;. -- .~.1_g~_~.~:~- 6 14180.57 88.73 69.51 247.79 8783.75 41.88 8551.51 8 5752.08 W 17.50 17.50 -0.26 359.19 -10187.6 7 14242.38 61.81 69.51 247.79 8805.39 21.64 8573.398 5805.68 W 0.00 0.00 0.00 0.00 -10230.2 8T 14766.99 524.61 89.25 340.008928.11 122.728375.558 6214.27W 17.50 3.76 17.58 91.48 -10225.4 .. ._-----_._.~_.._-_..~-_u.~.._.._--,._---~_._.."._..........._._u..-..-_...."_n_.._u...-.-..-....--..__.__n_.____..-.-----...---------------_u_-..-. ------u_- - -- -- - - --. -- _...._.n... -----------------,--,--------------_._----- -. --. ~..__.. 9 15082.53 315.54 89.26 35.54 8932.58 4.47 8075.038 6173.26W 17.60 0.00 17.60 90.39 -9936.1 10 15123.34 40.81 89.26 35.54 8933.10 0.53 8041.828 6149.54 W 0.00 0.00 0.00 0.00 -9895.9 11T 15123.78 0.43 89.26 35.60 8933.11 0.01 8041.478 6149.29W 14.00 0.63 13.99 87.42 -9895.5 ._-_..~._-_.._.._~-_.._-_._-_.__..~...._._--_._~..- ,.... .-."--'.-"-..-..'.U ~_.- ---,-,---,.-_u_.,-.,--,,-,,----,,----------,,----,-,-,_._-_.__._~_..._..¥~.__._---_._._.._....__.._-_.._--_.--_.._-------_.._._--~¥_~.__.__..._._.u_------------_.------- - . ." ~ -..,---..-- 12 15284.35 160.57 86.33 48.12 8939.31 6.20 7922.21 8 6042.46 W 8.00 -1.82 7.80 103.37 -9742.1 13 15937.93 653.58 86.33 48.12 8981.15 41.84 7486.778 5556.85W 0.00 0.00 0.00 0.00 -9141.2 14T 15999.13 61.20 90.00 48.00 8983.11 1 .96 7445.90 8 5511.36 W 6.00 6.00 -0.19 358.16 -9084.8 15 16000.43 1.30 90.00 47.928983.11 0.00 7445.038 5510.40W 6.00 0.00 -6.00 270.00 -9083.6 16 16408.93 408.50 90.00 47.928983.11 0.00 7171.288 5207.19W 0.00 0.00 0.00 0.00 -8706.7 17T 16410.23 1.30 90.00 48.00 8983.11 0.00 7170.41 8 5206.23 W 6.00 0.00 6.00 90.00 -8705.5 18 16415.00 4.77 90.02 48.29 8983.11 0.00 7167.228 5202.68 W 6.00 0.34 5.99 86.74 -8701.2 19 17226.67 811.67 90.02 48.298982.88 -0.236627.128 4596.79W 0.00 0.00 0.00 0.00 -7954.3 20T 17326.94 100.27 84.00 48.27 8988.11 5.23 6560.51 8 4522.08 W 6.00 -6.00 -0.02 180.15 -7862.2 21 17438.73 111.79 77.28 48.27 9006.28 18.17 6487.148 4439.81 W 6.01 -6.01 0.00 179.98 -7760.8 22T 17583.28 144.55 77.28 48.27 9038.11 31.83 6393.28 8 4334.57 W 0.00 0.00 0.00 0.00 -7631.0 10 October, 2002 - 10:58 -1 - DrillQuest Sperry-Sun Drilling Services North Slope Alaska BPXA PBU- WOA W Pad W-38. WPS - W-38A WP10 '........" d: 10 October, 2002 Proposal Report 10 October, 2002 Surface Coordinates: 5958897.05 N, 611789.00 E (70017' 47.9825" N, 149005' 41.1160" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 ~> Surface Coordinates relative to Project H Reference: 958897.05 N, 111789.00 E (Grid) Surface Coordinates relative to Structure Reference: 1674.82 N, 1898.72 E(True) Kelly Bushing: 88. 11ft above Mean Sea Level Elevation relative to Project V Reference: 88. 11ft Elevation relative to Structure Reference: 88.11ft spe....y-su., a At L.. LlNG.. ... SElAvn::ss A H311iburton Company Proposal Ref: pro11333 Sperry-Sun Drilling Services Proposal Report for PBU- WOA W Pad. W.38A WPS Revised: 10 October, 2002 BPXA North Slope A/aska Measured Sub-Sea Vertical Local Coordinates Vertical Depth Incl. Azim. Depth Depth Northings Eastings Section Comment (ft) (ft) (ft) (ft) (ft) W-38 Reca 0.00 0.000 0.000 -88.11 0.00 0.00 N 0.00 E 5958897.05 N 0.00 100.00 0.714 175.993 11.89 100.00 0.42 8 0.03 E 5958896.63 N 0.714 -0.37 200.00 0.478 180.376 111.88 199.99 1.46 S 0.07 E 5958895.59 N 0.239 -1.29 ~ 300.00 0.422 173.253 211 .88 299.99 2.24S 0.1 ,q,958894.81 N 0.079 -1.98 400.00 0.518 179.899 311.88 399.99 3.048 5958894.01 N 0.110 -2.68 500.00 1.234 186.331 411 .86 499.97 5958892.51 N 611789.12 E 0.721 -4.09 600.00 2.959 197.716 511.79 599.90 5958888.97 N 611788.28 E 1.767 -7.65 700.00 5.222 204.015 611.53 699.64 5958882.31 N 611785.74 E 2.304 -14.77 800.00 7.204 208.729 710.94 799.05 5958872.58 N 611781.01 E 2.045 -25.59 900.00 8.888 210.600 809.95 898.06, 5958860.32 N 611774.26 E 1.704 -39.54 1000.00 10.756 213.759 908.49 996.60 24.39 W 5958845.80 N 611765.37 E 1.944 -56.44 1100.00 13.645 216.660 1006.22 1 094.33 36.63 W 5958828.39 N 611753.38 E 2.952 -77.24 1200.00 16.099 217.220 1102.86 1190.97 52.09 W 5958807.67 N 611738.24 E 2.458 -102.37 1300.00 18.357 214.487 1198.37 1286.48 69.40 W 5958783.40 N 611721.28 E 2.398 -131.47 1400.00 20.957 210.122 1292.54 1380.65 87.29 W 5958754.68 N 611703.81 E 2.984 -164.84 1500.00 23.500 207.553 85.Ó9 1473.20 174.26 S 105.49 W 5958721.24 N 611686.12 E 2.722 -202.60 1600.00 25.388 206.968 476.13 1564.24 211.05 8 124.43 W 5958684.17 N 611667.72 E 1.904 -243.95 1700.00 27.223 206.884 1565.77 1653.88 250.558 144.50 W 5958644.38 N 611648.24 E 1.835 -288.25 1800.00 29.205 206.026 1653.88 1741.99 292.89 8 165.54 W 5958601.73 N 611627.84 E 2.024 -335.51 1900.00 30.884 206.983 1740.42 1828.53 337.728 187.90 W 5958556.57 N 611606.14 E 1.746 -385.60 2000.00 31.069 208.228 1826.17 1914.28 383.328 211.75 W 5958510.63 N 611582.98 E 0.667 -437.01 ~ 2100.00 31.798 209.251 1911.49 1999.60 429.04 8 236.83 W 5958464.54 N 611558.58 E 0.903 -489.06 2200.00 32.473 209.667 1996.17 2084.28 475.35 8 263.00 W 5958417.84 N 611533.10 E 0.710 -542.11 2300.00 32.954 209.882 2080.30 2168.41 522.26 8 289.85 W 5958370.54 N 611506.95 E 0.495 -595.99 2400.00 33.111 208.849 2164.14 2252.25 569.76 S 316.57 W 5958322.64 N 611480.94 E 0.585 -650.35 2500.00 33.495 208.469 2247.71 2335.82 617.96 S 342.89 W 5958274.05 N 611455.34 E 0.437 -705.17 2600.00 33.357 209.552 2331.20 2419.31 666.10 S 369.60 W 5958225.53 N 611429.35 E 0.612 -760.10 2700.00 35.168 209.969 2413.86 2501.97 714.95 8 397.53 W 5958176.27 N 611402.15E 1.826 -816.20 2800.00 38.114 210.270 2494.08 2582.19 766.56 S 427.49 W 5958124.21 N 611372.96 E 2.951 -875.65 2900.00 40.902 210.265 2571 .22 2659.33 821.51 S 459.55 W 5958068.79 N 611341.72 E 2.788 -939.03 10 October, 2002 - 10:56 Page 2 of 17 Drit/Quest 3.03.02.002 Sperry-Sun Drilling Services Proposal Report for PBU- WOA W Pad - W-38A WPS Revised: 10 October, 2002 BPXA North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Vertical Depth Incl. Azim. Depth Depth Northings Eastings Section Comment (ft) (ft) (ft) (ft) (ft) 3000.00 43.257 210.458 2645.45 2733.56 879.33 S 493.42 W 5958010.48 N -1005.76 3100.00 46.162 210.748 2716.51 2804.62 939.86 S 529.24 W 5957 -1075.79 3200.00 49.239 210.691 2783.80 2871 .91 1003.44 S 567.01 W 59 -1149.41 3300.00 52.204 210.757 2847.10 2935.21 1069.99 S 606.55 W 5957 -1226.46 3400.00 54.563 211.392 2906.71 2994.82 1138.74 S 648.00 W 59577 -1306.32 '"-",, 3500.00 55.390 211.816 2964.08 3052.19 690.93 W 5957678.41 N 611116.12 E 0.898 -1387.72 3600.00 55.039 211.668 3021.13 3109.24 734.14 W 5957607.93 N 611073.96 E 0.372 -1469.32 3700.00 54.986 211.606 3078.47 3166.58 777.11 W 5957537.55 N 611032.02 E 0.073 -1550.73 3800.00 54.848 211.459 3135.96 3224.07 819.90 W 5957467.18 N 610990.28 E 0.183 -1632.07 3900.00 55.133 211.431 3193.33 3281.44 86$[õa W 5957396.67 N 610948.59 E 0.286 -1713.49 4000.00 55.231 211.451 3250.42 3338.53 905.46 W 5957326.00 N 610906.81 E 0.099 -1795.11 4100.00 55.263 211.482 3307.43 3395.54 948.34 W 5957255.29 N 610864.98 E 0.041 -1876.78 4200.00 55.772 211.546 3364.06 3452.17 991 .42 W 5957184.39 N 610822.95 E 0.511 -1958.71 4300.00 56.599 211.761 3419.70 3507.81 1035.02 W 5957113.02 N 610780.40 E 0.846 -2041.27 4400.00 57.310 212.152 3474,22 3562.33 1079.40 W 5957041.24 N 610737.09 E 0.782 -2124.53 4500.00 57.295 212.211 3616.35 1911.18 S 1124.22 W 5956969.36 N 610693.33 E 0.052 -2208.06 4600.00 57.098 212.260 3670.53 1982.28 S 1169.05W 5956897.61 N 610649.56 E 0.201 -2291.49 4700.00 57.004 212.261 3724.91 2053.24 S 1213.84 W 5956825.98 N 610605.83 E 0.094 -2374.77 4800.00 56.764 212.296 3779.55 2124.05 S 1258.58 W 5956754.52 N 610562.16 E 0.241 -2457.90 4900.00 56.531 212.139 3834.52 2194.72 S 1303.11 W 5956683.19 N 610518.68 E 0.267 -2540.81 5000.00 56.200 212.115 3801.81 3889.92 2265.22 S 1347.39 W 5956612.03 N 610475.46 E 0.331 -2623.46 5100.00 56.199 211.930 3857.43 3945.54 2335.68 S 1391.45 W 5956540.93 N 610432.45 E 0.153 -2705.98 5200.00 55.806 211.942 3913.36 4001 .47 2406.04 S 1435.30 W 5956469.93 N 610389.65 E 0.393 -2788.31 '~ 5300.00 56.056 212.021 3969.38 4057.49 2476.30 S 1479.17 W 5956399.03 N 610346.83 E 0.258 -2870.57 5400.00 56.664 212.043 4024.78 4112.89 2546.87 S 1523.33 W 5956327.80 N 610303.72 E 0.608 -2953.23 5500.00 57.219 211 .766 4079.34 4167.45 2618.01 S 1567.63 W 5956256.01 N 610260.49 E 0.601 -3036.47 5600.00 58.301 211 .249 4132.68 4220.79 2690.13 S 1611.83 W 5956183.24 N 610217.36 E 1.167 -3120.55 5700.00 59.071 210.855 4184.65 4272.76 2763.32 S 1655.89 W 5956109.40 N 610174.39 E 0.841 -3205.54 5800.00 59.502 210.663 4235.73 4323.84 2837.20 S 1699.86 W 5956034.88 N 610131.53 E 0.462 -3291 .11 5900.00 60.347 210.402 4285.84 4373.95 2911 .73 S 1743.82 W 5955959.70 N 610088.68 E 0.875 -3377.28 6000.00 61.368 210.098 4334.54 4422.65 2987.18 S 1787.82 W 5955883.60 N 610045.81 E 1.055 -3464.28 6100.00 62.393 210.021 4381.66 4469.77 3063.53 S 1832.00 W 5955806.61 N 610002.77 E 1.027 -3552.17 6200.00 62.483 210.068 4427.92 4516.03 3140.28 S 1876.37 W 5955729.21 N 609959.54 E 0.099 -3640.52 6300.00 62.222 210.761 4474.33 4562.44 3216.67 S 1921.21 W 5955652.16 N 609915.85 E 0.666 -3728.73 6400.00 62.306 211.535 4520.87 4608.98 3292.41 S 1967.00 W 5955575.75 N 609871.19 E 0.691 -3816.77 10 October, 2002 - 10:56 Page 3 of 17 Dri/IQuest 3.03.02.002 Sperry-Sun Drilling Services Proposal Report for PBU- WOA W Pad. W.38A WPS Revised: 10 October, 2002 BPXA North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Vertical Depth Incl. Azim. Depth Depth Northings Eastings Section Comment (ft) (ft) (ft) (ft) (ft) . . 6500.00 62.510 212.100 4567.19 4655.30 3367.72 S 2013.73 W 5955499.75 N 0.540 -3904.81 6600.00 62.522 212.455 4613.35 4701.46 3442.72 S 2061.10 W 5955 0.316 -3992.85 6700.00 62.969 212.642 4659.13 4747.24 3517.66 S 2108.93 W 595 0.477 -4081.03 6800.00 62.955 212.717 4704.60 4792.71 3592.62 S 2157.03 W 5955 0.068 -4169.34 6900.00 63.496 212.603 4749.63 4837.74 3667.80 S 2205.21 W 59551 0.551 -4257.88 ~. 7000.00 62.961 212.711 4794.66 4882.77 2253.40 W 5955120.8 N 609591 .53 E 0.544 -4346.42 7100.00 61 .879 212.348 4840.96 4929.07 2301.06 W 5955045.56 N 609544.97 E 1.129 -4434.33 7200.00 61 .080 211.529 4888.71 4976.82 2347.54 W 5954970.32 N 609499.61 E 1.075 -4521.59 7300.00 60.341 211.123 4937.63 5025.74 2392.88 W 5954895.14 N 609455.39 E 0.820 -4608.31 7400.00 59.662 211.213 4987.65 5075.76 24311'Ø W 5954820.40 N 609411.68 E 0.683 -4694.44 7500.00 60.099 210.932 5037.82 5125.93 2482.34 W 5954745.65 N 609368.14 E 0.500 -4780.49 7600.00 59.677 210.631 5087.98 5176.09 2526.61 W 5954670.67 N 609324.98 E 0.496 -4866.60 7700.00 58.825 210.668 5139.12 5227.23 2570.42 W 5954596.10 N 609282.28 E 0.852 -4952.15 7800.00 58.641 210.587 5191.02 5279.13 2613.97 W 5954521.91 N 609239.83 E 0.196 -5037.25 7900.00 58.318 210.492 5243.30 5331.41 2657.28 W 5954447.85 N 609197.61 E 0.333 -5122.12 8000.00 58.229 210.572 5295.88 5383.99 4483.43 S 2700.49 W 5954373.95 N 609155.49 E 0.112 -5206.82 8100.00 57.825 210.651 5348.84 5436.95 4556.43 S 2743.69 W 5954300.31 N 609113.39 E 0.409 -5291 .27 8200.00 57.651 210.701 5402.22 5490.33 4629.16 S 2786.83 W 5954226.95 N 609071 .33 E 0.179 -5375.45 8300.00 57.681 210.754 455 ~70 . 5543.81 4701.80 S 2830.00 W 5954153.68 N 609029.25 E 0.054 -5459.56 8400.00 57.358 210.900 509.40 5597.51 4774.23 S 2873.23 W 5954080.61 N 608987.10 E 0.345 -5543.51 8500.00 57.306 210.891 5563.39 5651.50 4846.47 S 2916.45 W 5954007.74 N 608944.96 E 0.053 -5627.28 8600.00 57.543 210.932 5617.22 5705.33 4918.77 S 2959.74 W 5953934.80 N 608902.75 E 0.239 -5711.14 8700.00 57.651 211.010 5670.81 5758.92 4991.16 S 3003.19 W 5953861.77 N 608860.38 E 0.127 -5795.14 ..."'-' 8800.00 57.700 211.001 5724.28 5812.39 5063.59 S 3046.72 W 5953788.70 N 608817.93 E 0.049 -5879.22 8900.00 57.689 211.032 5777.72 5865.83 5136.03 S 3090.27 W 5953715.63 N 608775.46 E 0.029 -5963.31 9000.00 57.654 211.123 5831 .20 5919.31 5208.40 S 3133.89 W 5953642.62 N 608732.92 E 0.084 -6047.37 9100.00 57.798 211.237 5884.60 5972.71 5280.74 S 3177.66 W 5953569.63 N 608690.23 E 0.173 -6131.46 9200.00 57.700 211.497 5937.95 6026.06 5352.95 S 3221.69 W 5953496.77 N 608647.29 E 0.241 -6215.55 9300.00 57.342 211.768 5991 .65 6079.76 5424.78 S 3265.93 W 5953424.30 N 608604.12 E 0.425 -6299.39 9400.00 57.020 212.067 6045.85 6133.96 5496.11 S 3310.36 W 5953352.31 N 608560.75 E 0.408 -6382.85 9500.00 56.649 212.317 6100.56 6188.67 5566.95 S 3354.96 W 5953280.81 N 608517.22 E 0.426 -6465.95 9600.00 56.245 212.563 6155.84 6243.95 5637.28 S 3399.66 W 5953209.83 N 608473.57 E 0.453 -6548.62 9700.00 56.450 212.660 6211.26 6299.37 5707.39 S 3444.53 W 5953139.06 N 608429.75 E 0.220 -6631.16 9800.00 56.832 212.277 6266.24 6354.35 5777.86 S 3489.36 W 5953067.93 N 608385.96 E 0.498 -6714.03 9900.00 56.902 212.162 6320.90 6409.01 5848.71 S 3534.01 W 5952996.42 N 608342.38 E 0.119 -6797.15 10 October, 2002 -10:56 Page 4 of 17 DrillQuest 3.03.02.002 Sperry-Sun Drilling Services Proposal Report for PBU- WOA W Pad. W.38A WPS Revised: 10 October, 2002 BPXA North Slope Alaska Measured Sub-Sea Vertica I Local Coordinates Vertical Depth Incl. Azim. Depth Depth Northings Eastings Section Comment (ft) (ft) (ft) (ft) (ft) ".",.. . 10000.00 56.968 212.239 6375.45 6463.56 5919.62 S '0.092 -6880.33 10100.00 56.901 212.184 6430.02 6518.13 5990.52 8 0.081 -6963.51 10200.00 57.304 211.950 6484.33 6572.44 6061.68 8 0.448 -7046.88 10300.00 57.462 211.963 6538.23 6626.34 6133.158 0.158 -7130.53 10400.00 57.533 212.092 6591.97 6680.08 6204.65 8 0.130 -7214.27 ~ 10500.00 57.640 212.167 6645.57 6733.68 3802.12 W 5952565.05 N 608080.65 E 0.125 -7298.08 10600.00 57.642 212.074 6699.09 6787.20 3847.03 W 5952492.85 N 608036.81 E 0.079 -7381.95 10700.00 57.705 212.234 6752.56 6840.67 3892.00 W 5952420.65 N 607992.91 E 0.149 -7465.83 10800.00 57.537 212.377 6806.11 6894.22 3937.14 W 5952348.60 N 607948.84 E 0.207 -7549.64 10900.00 57.434 212.644 6859.86 6947.97 398~¡4i5 W 5952276.82 N 607904.59 E 0.248 -7633.29 10961.45 57.305 212.969 6893.00 6981.11 4010.49 W 5952232.91 N 607877.20 E 0.493 -7684.59 BHRZ 11000.00 57.218 213.161 6913.84 7001.95 4028.19 W 5952205.48 N 607859.91 E 0.475 -7716.71 11033.46 57.064 213.171 6932.00 7020.11 4043.56 W 5952181 .72 N 607844.88 E 0.461 -7744.55 TMLV/LCUfTKNG 11100.00 56.758 213.192 6968.33 7056.44 4074.07 W 5952134.62 N 607815.07 E 0.461 -7799.76 11200.00 56.292 213.263 7023.48 7111.59 4119.78 W 5952064.17 N 607770.41 E 0.470 -7882.37 11300.00 55.609 213.366 7079.47 7167.58 6841.608 4165.29 W 5951994.26 N 607725.94 E 0.688 -7964.40 11400.00 54.835 213.598 7136.51 7224.62 6910.10S 4210.60 W 5951925.08 N 607681.65 E 0.797 -8045.68 11500.00 54.281 213.907 7194.50 7282.61 6977.84 S 4255.85 W 5951856.68 N 607637.41 E 0.608 -8126.25 11600.00 53.961 214.549 253.1'2 7341 .23 7044.83 S 4301.42 W 5951789.02 N 607592.84 E 0.611 -8206.28 11700.00 54.025 215.638 311.92 7400.03 7111.00 8 4347.93 W 5951722.16 N 607547.32 E 0.883 -8285.96 11800.00 54.981 215.925 7369.99 7458.10 7177.05 S 4395.53 W 5951655.42 N 607500.71 E 0.984 -8365.99 11900.00 56.135 216.120 7426.54 7514.65 7243.75 8 4444.03 W 5951588.00 N 607453.20 E 1.165 -8447.01 12000.00 57.074 216.485 7481.58 7569.69 7311.03 S 4493.46 W 5951519.99 N 607404.78 E 0.987 -8528.94 ."-"" 12100.00 57.984 217.036 7535.28 7623.39 7378.61 S 4543.95 W 5951451.67 N 607355.30 E 1.022 -8611.60 12200.00 59.237 217.257 7587.34 7675.45 7446.66 S 4595.51 W 5951382.86 N 607304.76 E 1.268 -8695.13 12300.00 59.504 217.156 7638.28 7726.39 7515.20 8 4647.55 W 5951313.55 N 607253.75 E 0.280 -8779.31 12400.00 59.263 216.988 7689.21 7777.32 7583.87 8 4699.43 W 5951244.12 N 607202.90 E 0.281 -8863.54 12500.00 58.995 216.911 7740.52 7828.63 7652.46 8 4751.02 W 5951174.77 N 607152.33 E 0.276 -8947.58 12600.00 58.784 216.939 7792.18 7880.29 7720.91 8 4802.46 W 5951105.56 N 607101.91 E 0.212 -9031.43 12700.00 58.169 216.896 7844.47 7932.58 7789.06 8 4853.66 W 5951036.65 N 607051.73 E 0.616 -9114.90 12800.00 57.399 217.099 7897.78 7985.89 7856.63 S 4904.57 W 5950968.34 N 607001.83 E 0.790 -9197.72 12900.00 56.960 217.069 7951.98 8040.09 7923.67 8 4955.25 W 5950900.55 N 606952.16 E 0.440 -9279.97 13000.00 56.174 217.056 8007.06 8095.17 7990.28 S 5005.54 W 5950833.20 N 606902.86 E 0.786 -9361.66 13100.00 54.810 217.693 8063.71 8151.82 8055.77 S 5055.55 W 5950766.98 N 606853.83 E 1.461 -9442.22 13200.00 53.327 218.571 8122.40 8210.51 8119.46 8 5105.54 W 5950702.55 N 606804.79 E 1.645 -9521.15 10 October, 2002 -10:56 Page 5 of 17 DrillQuest 3.03.02.002 Sperry-Sun Drilling Services Proposal Report for PBU- WOA W Pad - W-38A WPS Revised: 10 October, 2002 BPXA North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) 13300.00 52.126 219.352 8182.99 8271.10 8181.30 S 5155.57 W 1.352 -9598.42 13400.00 52.753 219.411 8243.97 8332.08 8242.56 8 5205.87 W 0.629 -9675.26 8T Exit: Dir @ 12.0000/100ft, 60.00° Right TF : 13400.00ft MD, 8332.08ft TVD W-38A WP10 ..,.".,.""."", ,,-,' 13420.00 53.981 221.981 8255.90 8344.01 8254.72 8 5950565.66 N 606696.03 E 12.000 -9690.73 Begin Dir @ 5.058°/100ft : 13420.00t MD, 8344.01ft TVD 13500.00 53.539 226.969 8303.22 8391 .33 5950518.97 N 606651.54 E 5.058 -9751.62 13600.00 53.281 233.262 8362.87 8450.98 5950466.61 N 606590.76 E 5.058 -9824.39 13700.00 53.355 239.570 8422.64 8510.75 5950421.30 N 606524.67 E 5.058 -9892.94 13800.00 53.761 245.838 8482.08 8570.19 5950383.39 N 606453.80 E 5.058 -9956.72 13835.10 53.980 248.020 8502.78 8590.89 5487.33 W 5950371.90 N 606427.88 E 5.058 -9977.89 End Dir, 8tart Sail @ 53.980° : 13835.1 OftMD,8590.89ftTVD 13900.00 53.980 8629.05 ....,.... 8464.12 S 5536.00 W 5950351.53 N 606379.51 E 0.000 -10016.41 14000.00 53.980 8687.86 8494.39 S 5611.00W 5950320.14 N 606304.96 E 0.000 -10075.76 14071.85 53.980 8730.11 8516.148 5664.89 W 5950297.59 N 606251.41 E 0.000 -10118.41 7" Casing T8GR 14091.84 53.980 248.020 8522.19 S 5679.89 W 5950291.32 N 606236.50 E 0.000 -10130.28 Begin Dir @ 17.5000/100ft : 14091.84 MD, 8741.87ft TVD 14097.42 54.956 248.003 8657.00 8745.11 8523.89 8 5684.09 W 5950289.56 N 606232.32 E 17.500 -10133.61 T8HU 14100.00 55.407 247.996 8658.47 8746.58 8524.68 8 5686.06 W 5950288.73 N 606230.37 E 17.500 -10135.16 14180.57 69.506 247.790 8695.64 8783.75 8551.51 8 5752.08 W 5950260.93 N 606164.75 E 17.500 -10187.57 End Dir, Start Sail @ 69.506° : 14180.57ftMD,8783.75ftTVD ~ 14200.00 69.506 247.790 8702.44 8790.55 8558.39 S 5768.93 W 5950253.80 N 606148.01 E 0.000 -10200.97 14242.38 69.506 247.790 8717.28 8805.39 8573.39 S 5805.68 W 5950238.25 N 606111.49 E 0.000 -10230.21 Begin Dir @ 17.500°/1 0 Oft : 14242.3E MD, 8805.39ftTVD 14300.00 69.579 258.554 8737.47 8825.58 8588.99 S 5857.26 W 5950221.88 N 606060.14 E 17.500 -10266.31 14336.20 69.962 265.294 8750.00 8838.11 8593.76 8 5890.87 W 5950216.62 N 606026.61 E 17.500 -10284.95 TElL 14400.00 71.247 277.054 8771.25 8859.36 8592.51 8 5950.90 W 5950216.98 N 605966.56 E 17.500 -10309.40 14434.28 72.240 283.284 8782.00 8870.11 8586.76 S 5982.92 W 5950222.25 N 605934.46 E 17.500 -10317.85 T8AD 14500.00 74.675 295.013 8800.77 8888.88 8566.108 6042.30 W 5950242.03 N 605874.78 E 17.500 -10324.47 10 October, 2002 -10:56 Page 6 of 17 DrillQuest 3.03.02.002 Sperry-Sun Drilling Services Proposal Report for PBU- WOA W Pad. W.38A WPS Revised: 10 October, 2002 BPXA North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Vertical Depth Incl. Azim. Depth Depth Northings Eastings Section Comment (ft) (ft) (ft) (ft) (ft) 14524.38 75.736 299.287 8807.00 8895.11 8555.34 S -10323.68 45N 14600.00 79.476 312.288 8823.29 8911.40 8512.21 S -10310.12 14609.57 79.991 313.908 8825.00 8913.11 8505.77 S -1 0307.23 44N 14700.00 85.177 328.991 8836.73 8924.84 8435.84 S -10267.69 14766.99 89.250 340.000 8840.00 8928.11 8375.55 S -10225.40 Increase in Dir Rate @ 17.600°¡- 14766.99ft MD, 8928.11ft TVD ~ Target - W -38A Heel, Drillers 14800.00 89.215 345.810 8840.44 8928.55 6223.96 W 5950461.38 N 605689.83 E 17.600 -10201.01 14900.00 89.158 3.411 8841 .87 8929.98 6233.32 W 5950560.39 N 605679.01 E 17.600 -10115.30 15000.00 89.181 21.013 8843.33 8931.44 6212116 W 5950658.04 N 605698.62 E 17.600 -10018.26 15082.53 89.257 35.540 8844.47 8932.58 6173.26 W 5950731.09 N 605736.53 E 17.600 -9936.08 End Dir, Start Sail @ 89.257° : 15082.53ftMD,8932.58ftTVD 15100.00 89.257 35.540 8844.69 8932.80 6163.11 W 5950745.45 N 605746.47 E 0.000 -9918.89 15123.34 89.257 35.540 8844.99 8933.10 6149.54 W 5950764.65 N 605759.75 E 0.000 -9895.93 Begin Dir @ 14.0000/100ft: 15123.34 MD,8933.10ftTVD 43N 15123.78 89.260 8933.11 8041.47 S 6149.29 W 5950765.00 N 605760.00 E 14.000 -9895.50 Decrease in Dir Rate @ 8.0000/100ft : 15123.78ft MD, 8933.11ft TVD Target - W-38A T1b, Drillers 15200.00 87.856 41.536 7981.92 S 6101.81 W 5950825.25 N 605806.59 E 8.000 -9821.39 15284.35 86.330 48.118 7922.21 S 6042.46 W 5950885.84 N 605865.05 E 8.000 -9742.08 End Dir, Start Sail @ 86.330° : 15284.35ftM 0 ,8939 .31 ftTVD 15300.00 86.330 48.118 8852.20 8940.31 7911.78S 6030.83 W 5950896.44 N 605876.52 E 0.000 -9727.69 15400.00 86.330 48.118 8858.61 8946.72 7845.16 S 5956.53 W 5950964.16 N 605949.82 E 0.000 -9635.75 ~ 15500.00 86.330 48.118 8865.01 8953.12 7778.54 S 5882.23 W 5951031.88 N 606023.12 E 0.000 -9543.81 15600.00 86.330 48.118 8871.41 8959.52 7711.91 S 5807.93 W 5951099.60 N 606096.42 E 0.000 -9451.87 15700.00 86.330 48.118 8877.81 8965.92 7645.29 S 5733.63 W 5951167.32 N 606169.72 E 0.000 -9359.94 15734.21 86.330 48.118 8880.00 8968.11 7622.50 S 5708.21 W 5951190.49 N 606194.80 E 0.000 -9328.48 POWC 15800.00 86.330 48.118 8884.21 8972.32 7578.67 S 5659.33 W 5951235.05 N 606243.02 E 0.000 -9268.00 15900.00 86.330 48.118 8890.61 8978.72 7512.04 S 5585.03 W 5951302.77 N 606316.32 E 0.000 -9176.06 15937.93 86.330 48.118 8893.04 8981.15 7486.77 S 5556.85 W 5951328.45 N 606344.12 E 0.000 -9141 .19 Begin Dir @ 6.0000/100ft: 15937.93t MD,8981.15ftTVD 15999.13 90.000 48.000 8895.00 8983.11 7445.90 S 5511 .36 W 5951370.00 N 606389.00 E 6.000 -9084.82 Target - W-38A T2b, Drillers 16000.00 90.000 47.948 8895.00 8983.11 7445.31 S 5510.71 W 5951370.59 N 606389.64 E 6.000 -9084.02 10 October, 2002 -10:56 Page 7 of 17 DrillQuest 3.03.02.002 Sperry-Sun Drilling Services Proposal Report for PBU- WOA W Pad - W-38A WPS Revised: 10 October, 2002 BPXA North Slope Alaska Measured Sub-Sea Vertical Local Coordinates Global Coordinates Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) . 16000.43 90.000 47.922 8895.00 8983.11 7445.03 S 5510.40 W 5951370.88 N -9083.62 End Dir, Start Sail @ 90.000° : 16000.43ftMD,8983.11ftTVD 16100.00 90.000 47.922 8895.00 8983.11 7378.30 S 5436.49 W 5951438.70 N 606462.86 E 0.000 -8991.76 16200.00 90.000 47.922 8895.00 8983.11 7311.29 S 5362.27 W 5951506.81 N ~p6536.08 E 0.000 -8899.50 16300.00 90.000 47.922 8895.00 8983.11 7244.27 S 5288.04 W 5951574.93 N 606609.29 E 0.000 -8807.24 16400.00 90.000 47.922 8895.00 8983.11 7177.26 S 5213.82 W 5951643.04 N 606682.51 E 0.000 -8714.98 .~ 16408.93 90.000 47.922 8895.00 8983.11 7171.28 S 5951649.12 N 606689.05 E 0.000 -8706.75 Begin Dir @ 6.0000/100ft: 16408.93t MD, 8983.11ft TVD 16410.23 90.000 48.000 8895.00 8983.11 5951650.00 N 606690.00 E 6.000 -8705.55 Target - W-38A T3, Drillers 16415.00 90.016 48.286 8895.00 8983.11 5951653.24 N 606693.51 E 6.000 -8701.15 End Dir, Start Sail @ 90.016° : 16415.00ftMD,8983.11 ftTVD 16500.00 90.016 48.286 8894.98 8983.09 5951710.74 N 606756.11 E 0.000 -8622.94 16600.00 90.016 48.286 8894.95 8983.06 5951778.38 N 606829.76 E 0.000 -8530.93 16700.00 90.016 48.286 8894.92 8983.03 4989.93 W 5951846.02 N 606903.41 E 0.000 -8438.92 16800.00 90.016 48.286 8894.89 8983.00 4915.28 W 5951913.67 N 606977.06 E 0.000 -8346.90 16900.00 90.016 48.286 8894.86 8982.97 4840.63 W 5951981.31 N 607050.71 E 0.000 -8254.89 17000.00 90.016 48.286 8894.83 8982.94 4765.99 W 5952048.96 N 607124.36 E 0.000 -8162.88 17100.00 90.016 48.286 8894.80 8982.91 4691.34 W 5952116.60 N 607198.01 E 0.000 -8070.87 17200.00 90.016 48.286 894.78 8982.89 6644.87 S 4616.69 W 5952184.25 N 607271.66 E 0.000 -7978.85 17226.67 90.016 48.286 894.77 8982.88 6627.12 S 4596.79 W 5952202.29 N 607291 .29 E 0.000 -7954.32 Begin Dir @ 6.0000/100ft: 17226.67t MD, 8982.88ft TVD 17300.00 85.616 48.274 8897.56 8985.67 6578.37 S 4542.10 W 5952251.85 N 607345.25 E 6.000 -7886.90 17326.94 84.000 48.270 8900.00 8988.11 6560.51 S 4522.08 W 5952270.00 N 607365.00 E 6.000 -7862.22 Target - W-38A T4, Drillers 17400.00 79.608 48.271 8910.41 8998.52 6512.39 S 4468.13 W 5952318.92 N 607418.23 E 6.011 -7795.69 '~ 17438.73 77.280 48.272 8918.17 9006.28 6487.14 S 4439.81 W 5952344.59 N 607446.17 E 6.011 -7760.77 End Dir, Start Sail @ 77.280° : 17438.73ftMD,9006.28ftTVD 17500.00 77.280 48.272 8931.66 9019.77 6447.36 S 4395.20 W 5952385.03 N 607490.18 E 0.000 -7705.77 17583.28 77.280 48.272 8950.00 9038.11 6393.29 S 4334.58 W 5952440.00 N 607550.00 E 0.000 -7631.02 Total Depth: 17583.28ftMD,9038.11ftTVD 4 1/2" Liner Target - W-38A Land DD's Poly @ 80 MWD+IFR+MS, Drillers 10 October, 2002 -10:56 Page 8 of 17 DrillQuest 3.03.02.002 ~~fÆ~E]} fÆ:fÆ~[«fÆ A.I~A.SK& OIL AND GAS CONSERVATION COMMISSION TONY KNOWLES, GOVERNOR 333 W. "JTH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Bill Isaacson Senior Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage AK 99519-6612 ~~ Re: Prudhoe Bay Unit W-3sIJ.. BP Exploration (Alaska), Inc. Permit No: 202-191 Surface Location: 1356' SNL, 1453' WEL, Sec. 21, TIIN, RI2E, UM Bottomhole Location: 2471' SNL, 522' WEL, Sec.29,TIIN, RI2E, UM Dear Mr. Isaacson: Enclosed is the approved application for permit to redrill the above development well. . The permit to redrill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. The permit is for a new wellbore segment of existing well PBU W-38, Permit No 188-045, API 029-21807-01. Production should continue to be reported as a function of the original API number stated above. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's North Slope petroleum field inspector at 659-3607 (pager). Sincerely, ~ ~&uJv.£j11dliX ~ Cammy ~echsli T;~-- - Chair BY ORDER OF THE COMMISSION DATED thiSJ31h. day of September, 2002 cc: Department ofFish & Game, Habitat Section wlo encl. Department of Environmental Conservation wlo encl. 1 a. Type of work 0 Drill II Redrill 0 Re-Entry 0 Deepen 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1356' SNL, 1413' WEL, SEC. 21, T11 N, R12E, UM At top of produçtive interval 4121' SNL, 2341' WEL, SEC. 29, T11 N, R12E, UM At total depth 2471' SNL, 522' WEL, SEC. 29, T11N, R12E, UM 12. Distance to nearest property line 13. Distance to nearest well ADL 047452,522' MD No Close Approach 16. To be completed for deviated wells Kick Off Depth 14150' MD Maximum Hole Angle 18. Casin~ Program Specifications Size Hole Casina Weiaht Grade CouDlina 6-1/8" 4-1/2" 12.6# L-80 IBT Slotted "t.. STATE OF ALASKA \ ALASKA',-,, ' AND GAS CONSERVATION COMM,,-,510N PERMIT TO DRILL 20 AAC 25.005 1 b. Type of well 0 Exploratory 0 Stratigraphic Test II Development Oil 0 Service 0 Development Gas 0 Single Zone 0 Multiple Zone 5. Datum Elevation (DF or KB) 10. Field and Pool Plan KBE = 84.33' Prudhoe Bay Field / Prudhoe 6. Property Designation Bay Pool ADL 047453 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number -A ,i W-38b( .~~ 9. Approximate spud date" 09/19/02 / Amount $200,000.00 14. Number of acres in property 15. Proposed depth (MD and TVD) 2560 17908' MD / 9034' TVD 0 17. Anticipated pressure {S~20 AAC 25.035 (e) (2)} 98 Maximum surface 2770 psig, At total depth (TVD) 8800' / 3650 psig Setting Depth T OD Bottom Quantitv of Cement Lenath MD TVD MD TVD (include staae data) 3908' 14000' 8670' 17908' 9034' 146 cu ft Class 'D' / 'WGA- q/U/OL -J# 'tl[~{~ 11. Type Bond (See 20 AAC 25.025) Number 2S100302630-277 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner 14852 feet 9183 feet 13744 feet 8529 feet Length Plugs (measured) Top of 20/40 Carbolite Sandback at 14399'. (04/92) Junk (measured) Video Log shows collapsed tubing at 13744'. (01/2001) Size Cemented MD TVD 110' 110' 2976' 2716' 14139' 8749' 110' 20" 1976' 13-3/8" 14139' 9-5/8" 971' 7" 8 cu yds Concrete 4546 cu ft Coldset II 3062 cu ft Class 'G' 335 cu ft Class 'G' ti"'~~:t. 'tt'IJ d'r.~'"'' !: - , "I \:\ .i$' ii""" jtw"i\; 13,(~i:~' 1\~8po'¡i \l8fO~:..,7 9182' ii:;. t,:""',,l '",,:0;;,. >,,;.ò:, ~~ '~, :::",0.::.': Q~... Open: 14355' - 14395' Below Sandback: 14410' - 14455', 14467' - 14530', 14546' - 1~,Zl {]imM~:S1~65S: true vertical Open: 8877' - 8901' Below Sandback: 8910' - 8937', 8944' - 8983', 8992' - 9017', 9034' - 9060' II Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch II Drilling Program II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements Contact Engineer Name/Number: Michael Triolo, 564-5774 Prepared By Name/Number: Terrie Hubble, 564-4628 21. I ~erebY certify that t~e V~."POingliS t'Ae and correct to the be~t of my ~nowl~~ge . Signed Billlsaacson ~ ~ A. It~....... Title Senior Dnlllng Engineer Date <Sfñ S, Z.OO-¿ . . .~:t(_.IJ.niV' Permit Number API Number ÞlWrola, j?ate See cover letter .z.ð <. - /7'/ 50- 029-21807'.:oo.....~' ãh; ""'"\, \ 1 O'<A, for otherreauirements Conditions of Approval: Samples Required 0 Yes ßJ No Mud Log Required 0 Yes iii No Hydrogen Sulfide Measures 0 Yes fi No Directional Survey Required rzg Yes 0 No Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU Other: T~ion~á1~~~ ~SOO P'~' flo4íJk.J O/I(){02... . by order of rß]1 Cammy Oechsll Taylor Commissioner the commission Date vl \ Odt Submit In Triplicate Perforation depth: measured 20. Attachments Approved By Form 10-401 Rev. 12-01-85 ~) Greater Prudhoe Bay W-38L 1 Permit -) > Well Summary IWell Name: IW-38L 1 I Type of Well (producer or injector): Surface Location: W-38L 1 Target Start: W-38L 1 Target End: I AFE Number: I Extended Horizontal Sidetrack /¡! 3,9241 FSL, 1,4531 FEL, Sec. 21, T11 N, R12E X = 611 Y = 1,1591 FSL, 2,3411 FEL, Sec. 29, T11 N, R12E X = 605,760.00 Y = 5,950,765.00 Z = 8,820' TVDss 2,8091 FSL; 5221 FEL, Sec. 29, T11 N, R12E X = 607,550.00 Y = 5,952,440.00 Z = 8,950' TVDss I PBD4P1859 I Rig: I Doyon 14 I I 84.33' I I Estimated Start Date: I Sept. 19tn 2002 I I Well MD I 17,908' Well Design: Summary: I Operating days to complete: I 28.08 I I Well TVDrkb: TD I 9,034 I I I 98° I I KBE I Max Inc. Extended Horizontal Sidetrack Decomplete motherbore and sidetrack out of existing 26#, 7" casing into the Sag formation, directionally drill 6-%" hole, land horizontally in the Ivishak Z4B sands. Geosteer horizontally through the Z4B target sands to TD at 17,908' MD. Run, cmt and test a 4-%" Banzai (solid/slotted) liner, complete with a 4-%" chrome gas lift completion. Target Estimates: Estimated Reserves: Expected Initial Rate: Expected 6 month avg: Expected reserves 1.63 mmbbl Production rate: 1,180 bid Production rate: 1,090 bid Current Well Information General Well Name: Original Well API #: Sidetrack API #: Well Type: Current Status: Last H2S Sample: Cement: TD I PBTD: BHP: BHT: Is this well frac1d? W-38 50-029-21807 -00 50-029-21807 -60 Ivishak Zone 4 Producer All open perf's from 14,355 - 14,395' MD with fill (20/40 carbolite sandback) at 14,399' MD. Oppm 7" casing cemented over liner top packer @ 13,890' MD. Pumped 60 bbls of 15.8 ppg Class G cement. Had to drill up 12' of hard cement on top of liner top packer during cleanout trip. 14,399' MD top of fill 3,650 psi @ 8,800' TVDss (8.0ppg EMW). Estimated 235°F @ 8,8001 TVDss Estimated Yes Version #2, 9/04/2002 Mechanical Condition W-38 Wellhead: Cellar Box height: Doyon 14: Tubing: Liner: Casing Casing Head: Casing Hanger: Tubing Spool: Tbg. Hanger: Tree: Open Perfs: Casing Fluids: Materials Needed Production Liner: As Contingency As Contingency Completion: As Contingency ) Greater Prudhoe Bay W-38L 1 Permit ) 13-%" 5M McEvoy SSH with 9-%" mandrel hanger Above MSL = 50.33' KB I MSL = 34.0' 13,927' of 4-1/2",12.6#, L-80, TDS with planned tubing cut @ -13,700' MD. 7" , 26# L-80 liner top packer @ 13,890' MD. Surface: 13-%", 72#, L-80, IJ4S to 2,976' MD Intermediate: 9-%",47#, NT-80, NSCC to 14,115' MD Production: 7", 26#, L-80, IJ4S from 13,890 - 14,850' MD wi PBTD(fill) @ 14,399' MD McEvoy 20" Slip on weld, 3,000 psi 9-%" McEvoy Mandrel Hanger with 9-%" packoff McEvoy 13%", 5M Split Speed Head McEvoy DP2 13%" x 4-%" with 4-%" TDS top and btm (5 seal) 3.980", CIW type 'H' BPV profile McEvoy 5M, 4-1/16" Perforations from 14,355 - 14,656' Md with fill @ 14,399' MD SW with diesel cap down to -2,000' TVD Amount 4,000' 1,500' 100 each 1 each 2 each 1 each 1 each 1 each Amount 14,000' 1 each 1 each 3 each 6 each 1 each 1 each Surface and Anti-Collision Issues Description 4 %", 12.6#, L-80, IBT-Mod Slotted Liner 4 %",12.6#, L-80, IBT-Mod Solid Liner 4 %" x 5 3,4" x 8" Straight Blade Centralizers 4-%" Baker guide shoe Baker 20' Payzone ECP 4-%" x 7" HR ZXP with flex lock hanger Baker Bonsai hookup Baker 7", 26#, SC1-Retrievable packer Description 4 %" 12.6 Iblft, 13Cr-80, V AMACE tubing Baker S-3 Packer 9-%" X 4- Y2" Halliburton 4-%" XN-Nipple (3.725" 10) Halliburton 4-%" X-Nipple (3.813" 10) Camco 4-Y2" X 1-%" MMG Gas Lift Mandrels 4-%" WLEG 4-1/16", 5m Cameron Tree Surface Shut-in Wells: Evaluate W-37 & W-39 for the rig move on & off W-38 for possible shut-in requirements. . If the well house needs to be removed from an adjacent well, then the well needs to be shut-in prior to the move. Close Approach Wells: There are NO close approach wells associated with this profile. Well Name N/A Current Status N/A Production Priority N/A Precautions N/A 2 Well Control ) Greater Prudhoe Bay W-38L 1 Permit ) Well control equipment consisting of 5,000 psi working pressure pipe rams(2), blind/shear rams, and annular preventer will be installed and are capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to~psi. / ¡¡... ~'500 ~C¡ Ii Diverter, BOPE and drilling fluid system schematics on file with the AOGCC. . Production Section- Maximum anticipated BHP: ~$650 psi @ 8,800' TVDss - Ivishak Maximum surface pressure: /-2,770 psi @ surface (based on BHP and a full column of gas from TD @ 0.10 psi/ft),6 k ~SoO \LA7. Planned BOP test pressure: :3,.Qetrpsi (the 9-%" & 7" casing will be tested to 3,000 psi) Planned completion fluid: Estimated 8.6 ppg Seawater /6.8 ppg Diesel . . . . BOPE Rating 5,000 psi Working Pressure (entire stack and valves . Planned BOPE Test Pres. 3,000/250 psi Rams & Valves 2,500/250 psi Annular . Disposal NO ANNULAR INJECTION ON THIS WELL. No annular injection in this well. Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any metal cuttings will be sent to the North Slope Borough. Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul all Class I waste to Pad 3 for disposal. . . . Mud Program 7" Window Milling Mud Properties: Density (ppg) Funnel vis 8.4 - 8.6 45 - 55 YP 24 - 28 I Low Density Quickdril APIFL PH LSRV N/C 8.5 - 9.0 -25,000 cp I Low Density Quickdril LSRV pH <12,000 cp 8.5 - 9.0 MBT <3 6 Va" Production Hole Mud Properties: Density (ppg) Funnel vis YP 8.5 - 8.6./ 40 - 50 20 - 26 NOTE: See attached Baroid mud recommendation LCM Restrictions: Follow the attached LCM Decision Tree MBT <3 API FI N/C Formation Markers Formation Tops ft MD ft TVDss ft TVD Pore psi EMW (ppg) Hydrocarbons Base HRZ 6,893 Base Miluveach 6,932 Top Kingak 6,932 Top Sag River 8,642 Top Shublick 8,657 KOP 14,150 8,668 8,753 TElL 8,750 TSADfTZ4B 8,782 3,653 8.0 Yes 45N 8,807 3,664 8.0 Yes 44N 8,825 3,671 8.0 Yes Jõ'~ 43N 8,845 3,680 8.0 Yes Land 8,880 3,694 8.0 Yes TO 17,908 8,950 9,034 3,723 8.0 Yes 3 CasinglTubing Program ') Greater Prudhoe Bay W-38L 1 Permit ) 6%" Tubing Csgl Tbg O.D. 4 %" Slotted 4 %" GL WtlFt Grade Conn Length 12.6# L-80 / IBT I 12.6# 13Cr-80 V AMACE 3,908' 13,966' Top Bottom MD I TVDrkb MD I TVDrkb 14,000' / 8,670' 17,908' / 9,034' 34' / 34' 14,000' / 8,670' Hole Size Cement Calculations This is contingency only if OWC is higher then planned. Casin~ Size 14-%" 12.6 Ib/ft L-80 BTC-M - Bonsai Single Stage Basis I 10% excess - TOC: 14,300' MD, Bottom of Cement as needed based on OWC, assume 15,550' MD Total Cement Volume: Wash 10 bbls CW100 Spacer 30 bbls of Viscosified Spacer (Mudpush XL Design) Weighted to 9.6 ppg Tail 71 Class D-600G Latex Temp BHST == 235° F from SOR, BHCT 165° F estimated by Dowell 4 Y2" Slotted Liner Centralizer Placement a) Run one straight blade rigid centralizer per joint with no stop collar (Le. free floating across the whole length of the joint) for the whole string. Survey and Logging Program 6 Va" Hole Section: MWD I GR I Res I PWD I ABI Cased Hole: None Bit Recommendations BHA Hole Size Number and Section Prod Hole 6 %" Depths (MD) Bit Type Nozzles K-Revs Hours 14,150' -17,908' TBD Motors and Required Doglegs BHA No. 1 Motor Size and Motor Required Flow Rate RPMs Required Doglegs 4 3,4" Sperrydrill 4/5, 6.3 stg FTC Performance, 250 -275 60-100 Maximum build: 1.50 adj with 5.8" concentric sleeve and ABI gpm 16.5°/100' **It may require two BHA's to drill this profile, a 1.83° to drill the build and turn and a 1.5° to drill the tangent** 4 Scope of Work ) Greater Prudhoe Bay W-38L 1 Permit ) Pre-Ria Work: 1. Rig up slickline. Drift tubing and tag top of collapse at -13,744' MD for upcoming E-Line conveyed tubing chemical cut. 2. Replace all GlM's with DV's and pull lower GlM at -13,093' MD to provide circulation and equalization potential. IA cannot be overbalanced in relation to tubing side during chemical cut. 3. Liquid pack both the 4-%" tubing and the 4-Y2" x 9-%" annulus to surface with seawater. a. If can't circulate with returns, then punch holes in the tubing right above the collapse point. b. If can circulate, liquid pack the tubing and 9-%" annulus to surface. 4. RU E-line with CCl and chemical cutter. RIH, tag the collapsed point, log up to find the closest collar and position chemical cutter -10-15' above the collar (all depths referenced to Tubing Summary dated 3-1-92). This cut will be fished and the type and location of the cut is critical. As specified, the cut will leave approximately 10-15' of 4-%" tubing stub for fishing operations. 5. Freeze protect to 2,000' TVD with diesel. 6. Test the FMC 9-%" mandrel packoff and tubing hanger seals to 5,000 psi for 30 minutes. 7. Bleed tubing and annuli pressures to zero. Set a BPV in the tubing hanger and test from below to 1,000 psi. 8. Remove the well house and flowlines. If necessary, level the pad. Please provide total well preparation cost on the handover form. Ria Operations: 1. MIRU Doyon 14. Circulate out freeze protection and displace well to seawater. Set TWC. 2. Nipple down tree. Nipple up and test BOPE. 3. Pull and lay down the 13,700' 4-%" tubing string from the E-line cut and above. 4. MU overshot for 4-%" tubing and RIH. Wash over and engage 4-Y2" tubing stub. Release 'K' anchor from production packer and POH with remaining tubing down to production packer. 5. MU 9-%" packer milling assembly with PRT (packer retrieving tool). RIH and mill 9-%" packer until free. 6. After packer drops, circulate bottoms up to remove any trapped gas. 7. Push packer to top of 7" liner top packer @ -13,890' MD. / 8. Engage fish with PRT (in mill out extension below packer) & POH with remaining packer & tubing tail assembly. 9. MU clean-out BHA with mill / MWD / GR. RIH to 7" liner PBTD and circulate and condition wellbore as required. Pump hot oil to remove excess paraffin if needed. Use MWD/GR and existing GR/CCl log to determine desired KOP. 10. PU flow through packer, RIH and set above perfs such that the whipstock can be set directly on the packer with minimal spacing requireme~, POOH. 11. PU 7" whipstock assembly. Run a tubing spacer below the whipstock if needed to place the top of whipstock at -14,150'MD when spayr bottoms-out on packer. Orient whipstock to 85° and set on packer. Mill window in 7" liner at:t 14,150' MD. 12. RIH with 6-%" drilling assembly (~th MWD/GR/RES/PWD) to whipstock. Drill 20' of new formation. 13. Perform FIT to 9.7 ppg EMW. Kick-off and drill the 6-%" production section as per directional plan to an estimated TD @ ::!:17,908' MD (9,034' TVD). 14. Retrieve Baker Whipstock. ~ 15. Run and cement a 4-Y2", 12.6# l-80 Bonzai production liner (combination solid and slotted) and or full slotted liner using an inner-string configuration. Release from the liner. Displace well to clean brine and or seawater above the liner top packer. POH. 16. Run a 4-Y2"(12.6# 13Cr-80 Vam ACE completion tying into the 7" liner top. 17. Set packer and test the tubing to 3,500 psi and ~nulus to 3,500 psi for 30 minutes. / 18. Nipple down the BOPE. Nipple up and test the tree to 5,000 psi. 19. Freeze protect the well to -2,000' TVD and secure the well. 20. Rig down and move off. Post-Ria Work: 1. MIRU slickline. Pull the ball and rod / RHC plug from 'X' nipple below production packer. 2. Pull out RP shear valve from bottom GLM. 3. Install gas lift valves. 5 Greater Prudhoe Bay W-38L 1 Permit Job 1: MIRU Hazards and Contingencies ~ The two adjacent wells (W -39 and W -37) are both approximately 35' from the W -38 wellhead. Establish a minimum distance of 5' from the W-39 and W-37 wellhouse. The well houses will need to be removed from all three wells prior to the rig move. No swab valves will need to be removed in preparation for the move over W-38. Discuss the move at a pre-job safety meeting and designate a spotter to ensure there is no danger of a collision. If it appears the 5' distance will be crossed, the move should be stopped, the rig backed up, and the move re-attempted. ~ W Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should be followed at all times. Water injection on W-Pad was initiated in late 2001, and H2S levels are expected to remain low until the waterflood matures. Recent H2S data from the pad is as follows: W -38 less than 10 ppm Adjacent producers at Surface: W-39 less than 10 ppm W-37 less than 10 ppm Adjacent producers at TD: Z-18 10 ppm W-09 10 ppm The maximum recorded level of H2S on the pad was under 20 ppm. ~ The perforations will not be abandoned due to the desire to retain production from the motherbore to capture the remaining reserves out to the Southeast. The well should be overbalanced by -80 psi at surface with the diesel down to 2,000' TVD. Prior to moving over the well check the wellhead pressure to verify the well is dead. ~,'m>.~~;';,;,; Job 2: Decomplete Well Hazards and Contingencies :» The top perforations are not isolated, therefore monitor the well for gain/loss prior to beginning decompletion operations and while pulling the tubing and packer. :» There is a confirmed section of collapsed tubing at 13,744' MD. The collapse point is expected to be across a 9.66' pup joint at 13,739 -13,748' MD. It is also very possible that the 4Y2" tubing string is highly corroded and sections of the tubing may have high wall loss, with several possible penetrations. Limit over-pull on tubing string to 80% of tensile strength, and if tubing will not pull free on initial attempt, RU e-line to make a second cut. :» It is critical to retrieve the K-anchor from the packer after laying down the tubing above the collapse point in order to recover the last GLM @ 13,748' MD. If the K-anchor does not come free then we will have to burn over the GLM in order to get to the packer below. This could require up to three trips to burn over the mandrel. :» NORM test all retrieved well head and completion equipment. '._.,-,.._.."."..."..,~("',..._..- Job 3: Run Whipstock Hazards and Contingencies :» Once milling is complete, make sure all BOP equipment is operable. Wash out BOP stack to remove any metal cuttings which may have settled out. 6 ) Greater Prudhoe Bay W-38L 1 Permit --) Job 7: Drill 6-118" Production Hole Hazards and Contingencies » Four expected fault crossings have been identified for this hole section (see the attached cross-section for details on fault throws and expected depths along the well path). Throws on these faults are small (10 to 25'), however the risk of encountering losses at these faults is considered to be low risk (10-20%). There is some extra time and money in the AFE to cover minor losses. Follow the LCM Decision tree if losses are encountered. » W Pad has a history of lost circulation events while drilling in the reservoir section. Typical loss rates have been in the 20 to 30 bph range, however there is a single case where W -12A crossed a fault and experienced losses at -100 bph. The majority of cases have been fault related and all were managed by pumping fiberous LCM pills. Good drilling practices to limit ECD's and surge pressures should be a standard. To be prepared for potential lost circulation, a copy of the 'Recommended Lost Circulation Procedures' and the 'Lost Circulation Flow Chart' will be sent to the rig prior to drilling out in the 6-%" production interval. ~ Kick Tolerance: The kick tolerance for the 6-%" open hole section would be an infinite influx assuming a kick from the Ivishak at -17,908' MD. This is a worst case scenario based on an 8.0 ppg pore pressure gradient, a fracture gradient of 9.7 ppg at the 7" window (14,150' MD), and 8.4+ ppg mud in the hole. .~.~.~mff:'».,'fØm. Job 9: Install 4Y2" Production Liner Hazards and Contingencies » An entire slotted liner may replace the Bonzai liner if water saturations within the fault block are lower then 30% and no losses are encountered while drilling the horizontal section. » Differential sticking could be a problem over this long horizontal section. Minimize the time the pipe is left stationary while running the liner. » Avoid high surge pressures with controlled running speeds and by breaking circulation slowly. High surge pressures could lead to losses. » Ensure the liner top packer is set prior to POOH. This may require going through the setting process twice. Slack off with rotation to the maximum allowable down weight, as per Baker representative. ~~~. .~.:mw.~.~ Job 12: Run Completion Hazards and Contingencies » Diesel will be used to freeze protect the well. 0.1 psia at 100° F. The diesel flash point is 100° F. Diesel vapor pressure is - '~,~.~~~.~.~.;::,m.~.~.~ Job 13: ND/NU/Release Rig Hazards and Contingencies » See Job 1 for adjacent well spacing. Identify hazards in a pre move meeting, and take every precaution to ensure good communication prior to beginning the rig move. Use spotters when moving the rig. 7 Drillina Hazards an~ Continaencies Greater Prudhoe Bay W.38L 1 Permit '~) POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. The Ivishak in this fault block is expected to be normal pressured at 8.0 ppg EMW. This pressure is estimated based on offset well pressures and material balance. II. Lost Circulation A. Lost circulation is unlikely. B. W Pad has a history of lost circulation events while drilling in the reservoir section and normally occur when crossing faults. Four expected fault crossings have been identified for this hole section. Throws on these faults are small (10 to 25'), however the risk of encountering losses at these faults is considered to be low risk (10-200/0). III. Kick Tolerance/Integrity Testing A. The 7" casing was fully cemented with 15.8 Ib/gal tail cement above the liner top packer @ -13,890' MO during the original drill and complete of the well in June 1988. B. The Kick Tolerance for the production hole section is infinite with 8.5 ppg mud, 9.7 ggp FIT, and an 8.0 ppg pore pressure. This FIT should prove up adequate formation strength for expected ECO's. C. Integrity Testing Test Point 7-in window Test Depth 20-ft minimum from the 7 -in window Test type FIT EMW (lb/Qal) 9.7 minimum IV. Stuck Pipe A. We do not expect stuck pipe. B. There could be slight differential sticking issues within the reservoir. Centralizers will be run to mitigate. V. Hydrogen Sulfide A. W Pad is not designated as an H2S site, however Standard Operating Procedures for H2S precautions should be followed at all times. Recent H2S data from the pad is as follows: B. Adjacent producers at Surface: a. W -39 less than 10 ppm b. W -37 less than 10 ppm C. Adjacent producers at TO: a. Z-18 10 ppm b. W-09 10 ppm D. The maximum level of H2S recorded on the pad to date was less than 20 ppm. VI. Faults A. The planned directional trajectory crosses four faults. The estimated throws and locations of the faults are listed below: a. Fault #1 : b. Fault #2: c. Fault #3: 15,428' MO 15,757' MO 16,202' MO 16,444' MO 10-15'NE 15 - 20' NE 10-15'NE 8,904' TVO 8,918' TVO 8,948' TVO 8,963' TVO 20-25' NE d. Fault #4: CONSULT THE S PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION 6 TREE: 4-1/16" - 5M CIW L-80 WELLHEAD: 13 5/8" - 5M McEvoy 13-3/8", 72 #Ift, L -80, BTC I 2,976' I a \ ,?>S,?<\' 7" Liner Top at I~' J 9-5/8",47 #Ift, L-80, BTC ,,,\ \~. 11+.+1'5' I ~ Window Milled from Whipstock Top of Window at +/-14,150' MD Baker SC 1-R Packer with tailpipe at +/-14,180' MD 7",26 lIft, L-80, IJ4S I 14,850' I W-38L 1 Proposed Completion I 1 2,125' 4-1/2" X-Nipple with 3.813" 10. ... -!: 4-1/2" 12.6# 13Cr-80 Vam Ace Tubing with GLM's v GAS LIFT MANDRELS MD Size - 4,000' 1-1/2" - 8,400' 1-1/2" - 11 ,200' 1-1/2" -11,900' 1-1/2" -12,800' 1-1/2" 1 jt above pkr 1-1/2" --!:: 6 5 4 3 2 1 -!: L L . ~ . 4-1/2" 'X' Landing Nipple with 3.813" seal bore. 9-5/8" x 4-1/2" 9Cr Baker 'S-3' Production Packer 4-1/2" 'X' Landing Nipple with 3.813" seal bore. 4-1/2" 'XN' Landing Nipple with 3.725" seal bore. 4-1/2" WireLine Entry Guide spaced-out into 4-1/2" liner tie-back sleeve. I +/-13,950' I BAKER 5" x 7" Tie Back Sleeve ZXP Liner Top Packer 'HMC' Hydraulic Liner Hanger 4-1/2" 12.6#, L-80, IBT-M Solid linerw/Baker ECP at I +/-15,000' & below owe I Valve Type RP Shear DV DV DV DV DV Cellar Elevation = 50.33' Doyon 14 RKB = 84.33' --# ~ 4-1/2" 12.6 #/ft, L-80, IBT Slotted Liner .., I +/-17,908' I !!!!!!;!;!;i§!~I) / ~ 1-' -I Date 08/26/02 Rev By Comments Mik Triolo Proposed Completion PRUDHOE BAY UNIT WELL: W-38L 1 API NO: 50-029-21807-60 GPB Drilling & Wells bp COMPANY DETAILS UP Amoco Calculation McUlod: Millimwn Curvature Error System: ISCWSA Scan Method: Trav Cylinder North EITor Surface: Elliptical + Casing Wamj J~ MCUlOd: Rules Based ...;;," " " ;iff " ;t! .~.,~ ~ "v~ 8400- Æ 4:: 0 0 :!. .c:: g. 8800 0 i -- - ---- -- - -- - - --~ - ------ I i I I .:.. i õ. ] 'J:: > 2 f-< i i f~' 11111' I j'", 11 ~t" ' IIII~ ",' T ~D T\.[ ¡ -.-.-- -"-1 .--. ..-.-- j ! ¡ I ' 9200 ~-1'_HI REFBRENCB INFORMATION C(K)rdinate (N/E) Reference: Well Centre: W-38, True North Vertical (lVD) Reference: 8433' W-38a (femp) 8433 Section (VS) Reference: Slot - 38 (O.OON,O.OOB) Measured Depth Reference: 8433' W-38a (femp) 8433 Calculation Method: Minimwn Curvature CASING DETAILS No. TVD MD Name 9034.33 17908.09 4 1/2" FORMATION TOP DETAILS No. TVDPath MDPath Fonnation I 8816.33 14262.44 TSGR 2 8835.33 14297.41 TSHU 3 8927.33 14502.82 TElL 4 8959.33 14636.36 TSAD 5 8994.33 17722.52 45N 6 9031.33 17894.48 44N Start Dir 6/100' : 16213.29' MD, 8948.87'TVD : 162270'8. r--.1D. ,<qu T T \ D ~- - - T-\ i 'I; I III " ~fltI7"'-IT - Ihi'", ~ -, r I\tp. S'J7l, \.,. -roo . .-. -"-- , ".. SURVEY PROGRAM Plan: W-38A wp05 (W-38/Plan W-38A) Depth Fm Depth To SlUVeylPlan 14150.00 17908.10 Planned: W-38A wp05 V5 Tool Created By: Ken Allen Date: 7/31/2002 MWD Checked: Date: Reviewed: Date: WELL DETAILS Name +N/-5 Northing Longitude Slot Eastiog Latitude +PJ.W Size W-38 1675.49 1894.68 5958897.05 611789.00 70017'47.982N 149°05'41.116W 38 4.500 TARGET DETAILS Name 1VD +N/-S +PJ-W Northing Easting Shape W-38A Tl 890433 -8042.16 -6149.83 5950765.00 605759.99 Point W-38A TO ken 892433 -8376.26 -6214.81 5950430.00 605699.99 Point W.38A T2 894933 -7505.28 -5596.73 5951310.00 606304.99 Point W-38A T3 897933 -7171.02 -5206.69 5951650.00 606689.99 Point W-38A T4 898433 -6561.08 -4522.48 5952270.00 607364.99 Poiot W-38A Land 903433 -6393.83 -4334.95 5952440.00 607549.99 Point SECTION DETAILS Sec MD Inc Azi TVD +N/-S +E/-W DLeg TFace VSec Target 1 1~ 1 11.00 54.64 221.16 8752.63 -;-7: .;.20 -5599.37 0.00 0.00 1" ".~.06 2 1~ :"".00 55.43 228.42 8781.31 -:.:..~.24 -5628.22 12.00 84.49 1"~1I~.28 3 1~:.".i.07 97.87 325.18 8959.44 -:".~ \.87 -6117.23 16.50 87.28 1"..;.. ".34 4 1~' -.11.73 97.87 325.18 8953.32 -s,," 7.55 -6142.49 0.00 0.00 1",il.46 5 1""":.;.56 95.15 0.00 8924.33 -, ':';.26 -6214.81 14.00 92.32 I"~ :'1.60 W-38A TD ken ~ 6 1..""".18 95.15 0.08 8924.27 -s, ¡';.64 -6214.81 12.00 92.51 111~-"1.09 7 1 ".':..12 95.15 0.08 8915.94 -s:s \.07 -6214.69 0.00 0.00 1" \~ 1.40 8 1 '~H.82 90.00 30.00 8904.33 -s"~_~.16 -6149.83 12.00 98.86 1"1,,7.60 W-38A T1 9 1 ..;.. \.89 86.07 48.73 8912.60 -!s .,S.27 -5999.02 8.00 102.07 '1:, ¡1).77 10 1..-' 1\.29 86.07 48.73 8948.87 --;.'''''.91 -5602.03 0.00 0.00 ., "".65 11 I..: -'''.35 86.40 49.00 8949.33 -;'''';.28 -5596.73 6.00 39.09 ." '.~.85 W-38A T2 12 1'.::?18 86.45 49.41 8949.76 - 7 ''''1.83 -5591.57 6.00 82.74 " ,~.i.27 13 I"'. '.;.47 86.45 49.41 8977.50 - ¡ :"' '.69 -5251.81 0.00 0.00 "'i -1-.63 14 I.. 7 \~..94 90.02 49.40 8979.33 - : I i I .02 -5206.69 6.00 -0.12 ;-,s., 7.29 W-38A T3 15 I.. ". '.73 90.02 48.27 8979.32 -il ';{'65 -5192.54 6.00 -90.19 ""'.12 16 1 ¡ '..1.46 90.02 48.27 8979.10 -..,.: 7.69 -4597.17 0.00 0.00 \"",';.54 17 17'..-1.73 84.00 48.27 8984.33 -.. .".1.08 -4522.48 6.00 -179.97 ""'.'\.49 W-38A T4 18 17 '.. '.78 77.28 48.27 9002.55 -'.b 7.53 -4440.02 6.00 179.98 ¡s.d.34 19 1 :.'''-':".10 77.28 48.27 9034.33 -.. ,., \.83 -4334.95 0.00 0.00 i:' ~~.82 W-38A Land All TVD depths are ssTVD plus 84.33'for RKBE. "--..;i' 8800 I ' 9200 Vertical Section at 214.14° [400ft/in] 10400 I 10800 I 1 11200 -6000- :s ;¡:: 0 0 ~ +' :;:: 1:: ~ :;:: ~ 0 r/.J -8400- +'."-.:-"'. -9000 bp COMPANY DETAILS REFERENCE INFORMATION BP Amoco Co-<>rdinate (N/E) Reference: Well Centre: W-38. True North Vertical (TVD) Reference: 8433' W-38a (femp) 8433 Seclion (VS) Reference: Slot - 38 (O.ooN,O.ooE) Measured Depth Reference: 8433' W-38a (femp) 8433 Calcu1ation Method: Minimwn Curvature Calculation Method: Minimwn Ctuvature Error System: ISCWSA Scan Method: Trnv Cylinder North Error Surface: Elliptical -+- Casing WamitJ~ Melhod; Rules Based CASING DETAILS FORMATION TOP DETAILS Size No. TVDPath MDPath Fonnation 4.500 1 8816.33 14262.44 TSGR 2 8835.33 14297.41 TSHU 3 8927.33 14502.82 TElL 4 8959.33 14636.36 TSAD 5 8994.33 17722.52 45N 6 9031.33 17894.48 44N No. TVD MD Name 9034.33 17908.09 4 1/2" AllTVD depths are ssTVD plus 84.33'.for RKBE. -5400 West(-)/East(+) [600ft/in] I -4200 SURVEY PROGRAM Plan: W-38A wp05 (W-38/Plan W-38A) Depth Fm Depth To StUVeyIPlan 14150.00 17908.10 Planned: W-38A wp05 V5 Too1 Created By: Ken AJlen Checked: Date: Date; 7/31/2002 MWD Reviewed: Date: WELL DETAILS Name +N/-S Northing Latitude Longitude Slot +EI-W Basting W-38 1675.49 1894.68 5958897.05 611789.00 70ol7'47.982N 149°05'4L116W 38 TARGET DETAILS Name TVD +N/-S +EI-W Northing Easting Shape W-38A TI 890433 .8042.16 -6149.83 5950765.00 605759.99 Point W-38A TD ken 892433 -837626 -6214.81 5950430.00 605699.99 Point W-38A T2 894933 -750528 .5596.73 5951310.00 606304.99 Point W-38A T3 897933 -7171.02 -5206.69 5951650.00 606689.99 Point W-38A T4 898433 -6561.08 4522.48 5952270.00 607364.99 Point W-38A Land 903433 -6393.83 4334.95 5952440.00 607549.99 Point SECTION DETAILS See MD Ine Azi TVD +N/-S +E/-W DLeg TFaee VSee Target 1 1J1 ~().OO 54.64 221.16 8752.63 -~ i: ';.20 -5599.37 0.00 0.00 1" If. ~..06 2 1-'1:"'1.00 55.43 228.42 8781.31 -~ 7., t24 -5628.22 12.00 84.49 I" ~"~..28 3 1-'1:"";.07 97.87 325.18 8959.44 -~..~ \.87 -6117.23 16.50 87.28 1"." :'.34 4 1-'1' .'1.73 97.87 325.18 8953.32 -~1.1I7.55 -6142.49 .,ø""Ò.OO 0.00 1"': 1.46 5 1..".,s.56 95.15 0.00 8924.33 -, ,7';.26 -6214.81 14.00 92.32 1"~:'1.60 W-38A TD ke\~ 6 1',11".).18 95.15 0.08 8924.27 -~ ':";.64 -6214.81 12.00 92.51 1"~:".09 7 1.' 1":..12 95.15 0.08 8915.94 -'::, \.07 -6214.69 0.00 0.00 1"'~ '.40 8 1. ~H.82 90.00 30.00 8904.33 -::II~ _~.16 -6149.83 12.00 98.86 1" 1117.60 W-38A Tl 9 1. .." \.89 86.07 48.73 8912.60 -;:, <;.27 -5999.02 8.00 102.07 '/";'1.77 10 1'._.1 \.29 86.07 48.73 8948.87 -1''''1.91 -5602.03 0.00 0.00 ., '."'.65 11 I,.: :'1.35 86.40 49.00 8949.33 -) -.11 ;.28 -5596.73 6.00 39.09 ";..:..85 W-38A T2 12 1'.::?l8 86.45 49.41 8949.76 ->11'1.83 -5591.57 6.00 82.74 ., '~,i.27 13 1...." ;.47 86.45 49.41 8977.50 -;:,,'1.69 -5251.81 0.00 0.00 :,"I'¡.63 14 1.. i '+.94 90.02 49.40 8979.33 -: I! 1.02 -5206.69 6.00 -0.12 ,,'.,7.29 W-38A T3 15 1..;'.. \.73 90.02 48.27 8979.32 - i 1 <0(.65 -5192.54 6.00 -90.19 '" '.'.12 16 1 >.1.46 90.02 48.27 8979.10 -r.',: 7.69 -4597.17 0.00 0.00 ~1I'..;.54 17 1 )..., 1.73 84.00 48.27 8984.33 -.. ".1.08 -4522.48 6.00 -179.97 ¡'.,.S.49 W-38A T4 18 1 ;:.,. \.78 77.28 48.27 9002.55 -..b 7.53 -4440.02 6.00 179.98 7".1.34 19 1 ¡."'S.10 77.28 48.27 9034.33 -r..'" \.83 -4334.95 0.00 0.00 i 7: ~..82 W-38A Land ~y / Æ:,<>;¿:!:1JJJ, ~l M." . / ~.; ..' .~.'. .... .' ...' .. .".'/ ...' .. .' .... .... .. ,/ ."'.. ../YStifl.l'-........! ", >,1 ~r~~~:~~~~~~ ~Q/ ~><7'Y...,.,./ ..."'.'.....' ..'.".."'ê.."" ...'" .'.':...'/"">-(; "'~ , ,,~~/;/.;;/>~~<,)<7"""""" ~ ß .... "...,."/....,..,........"..,,.....:;<../'" .' .'. . .'-.' ..,....,..,...,.,...,/.,{"'L."'" , ' '" . /'.. /. '''' . ...;/..... ...... " . "" :;ç:2~"''''' j! 'v"" ,,"", .........., . . ') BP My Planning Report MAP ') , Compan)': Field: Site: Well : Well path: Field: Date: 7/31/2002 Time: 10:16:29 Co-ordinate(NE) Reference: Well: W-38, True North Vertical (TVD) Reference: 84.33' W-38a (Temp) 84.3 Section (V8) Reference: Well (0.00N,O.00E,214.14Azi) Survey Calculation Method: Minimum Curvature Db: BP Amoco Prudhoe Bay PB W Pad W-38 Plan W-38A Prudhoe Bay North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Coordinate System: Geomagnetic Model: PB W Pad TR-11-12 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 47.83 ft Site: 5957194.18 ft 609919.18 ft Latitude: Longitude: North Reference: Grid Convergence: W-38 W-38 Well Position: Slot Name: Well: +N/-S 1675.49 ft Northing: 5958897.05 ft +E/-W 1894.68 ft Easting: 611789.00 ft Position Uncertainty: 0.00 ft Latitude: Longitude: WeIlpath: Plan W-38A Drilled From: Tie-on Depth: Above System Datum: Declination: Mag Dip Angle: +E/-W ft 0.00 Current Datum: Magnetic Data: Field Strength: Vertical Section: 84.33' W-38a (Temp) 6/24/2002 57508 nT Depth From (TVD) ft 0.00 84.33 ft Height +N/-S ft 0.00 Plan: W-38A wp05 Date Composed: Version: Tied-to: Principal: Yes Casing Points Page: Oracle Alaska, Zone 4 Well Centre BGGM2002 70 17 31.506 N 149 6 36.343 W True 0.84 deg 38 70 17 47.982 N 149 5 41.116 W W-38 14150.00 ft Mean Sea Level 25.96 deg 80.76 deg Direction deg 214.14 7/17/2002 5 From: Definitive Path MD TVD Diameter Hole Size Name ft ft in in 17908.09 9034.33 4.500 6.125 41/2" Formations MD TVD Formations Lithology Dip Angle Dip Direction ft ft deg deg 0.00 THRZ?? 0.00 0.00 0.00 BHRZ 0.00 0.00 0.00 TML V/LCU 0.00 0.00 0.00 TKNG 0.00 0.00 14262.44 8816.33 TSGR 0.00 0.00 14297.41 8835.33 TSHU 0.00 0.00 14502.82 8927.33 TElL 0.00 0.00 14636.36 8959.33 TSAD 0.00 0.00 17722.52 8994.33 45N 0.00 0.00 17894.48 9031.33 44N 0.00 0.00 0.00 POWC 0.00 0.00 0.00 43N 0.00 0.00 Targets Map Map <-- Latitude --> <- Longitude -> Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min Sec Dip~ Dir. ft ft ft ft ft W-38A T1 8904.33 -8042.16 -6149.83 5950765.00 605759.99 70 16 28.863 N 149 840.181 W W-38A TD ken 8924.33 -8376.26 -6214.81 5950430.00 605699.99 70 16 25.577 N 149 8 42.065 W W-38A T2 8949.33 -7505.28 -5596.73 5951310.00 606304.99 70 16 34.148 N 149 8 24.088 W .' ) BP My Planning Report MAP Company: BP Amoco Date: 7/31/2002 Time: 10:16:29 Page: 2 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: W-38, True North Site: PB W Pad Vertical (TVD) Reference: 84.33' W-38a (Temp) 84.3 Well: W-38 Section (VS) Reference: Well (0.OON,0.00E,214.14Azi) Well path: Plan W-38A Surve)' Calculation Method: Minimum Curvature Db: Oracle Targets Map Map <- Latitude ---> <- Longitude --> Name Description TVD +N/-S +E/-W Northing Easting Deg Min Sec Deg Min Sec Dip. Dir. ft ft ft ft ft W-38A T3 8979.33 -7171.02 -5206.69 5951650.00 606689.99 70 16 37.438 N 149 8 12.737 W W-38A T 4 8984.33 -6561.08 -4522.48 5952270.00 607364.99 70 16 43.441 N 149 7 52.823 W W-38A Land 9034.33 -6393.83 -4334.95 5952440.00 607549.99 70 16 45.087 N 149 7 47.365 W Plan Section Information MD Incl Azim TVD +N/-S +E/-W DLS Build Turn TFO Target ft deg deg ft ft ft deg/100ft deg/100ft deg/1000 deg 14150.00 54.64 221.16 8752.63 -8725.20 -5599.37 0.00 0.00 0.00 0.00 14200.00 55.43 228.42 8781.31 -8754.24 -5628.22 12.00 1.59 14.52 84.49 14806.07 97.87 325.18 8959.44 -8643.87 -6117.23 16.50 7.00 15.96 87.28 14850.73 97.87 325.18 8953.32 -8607.55 -6142.49 0.00' 0.00 0.00 0.00 15098.56 95.15 0.00 8924.33 -8376.26 -6214.81 14.00 -1.10 14.05 92.32 W-38A TD ken 15099.18 95.15 0.08 8924.27 -8375.64 -6214.81 12.00 -0.53 12.01 92.51 15192.12 95.15 0.08 8915.94 -8283.07 -6214.69 0.00 0.00 0.00 0.00 15444.82 90.00 30.00 8904.33 -8042.16 -6149.83 12.00 -2.04 11.84 98.86 W-38A T1 15683.89 86.07 48.73 8912.60 -7858.27 -5999.02 8.00 -1.64 7.84 102.07 16213.29 86.07 48.73 8948.87 -7509.91 -5602.03 0.00 0.00 0.00 0.00 16220.35 86.40 49.00 8949.33 -7505.28 -5596.73 6.00 4.66 3.79 39.09 W-38A T2 16227.18 86.45 49.41 8949.76 -7500.83 -5591.57 6.00 0.76 5.96 82.74 16675.47 86.45 49.41 8977.50 -7209.69 -5251.81 0.00 0.00 0.00 0.00 16734.94 90.02 49.40 8979.33 -7171.02 -5206.69 6.00 6.00 -0.01 -0.12 W-38A T3 16753.73 90.02 48.27 8979.32 -7158.65 -5192.54 6.00 -0.02 -6.00 -90.19 17551.46 90.02 48.27 8979.10 -6627.69 -4597.17 0.00 0.00 0.00 0.00 17651.73 84.00 48.27 8984.33 -6561.08 -4522.48 6.00 -6.00 0.00 -179.97 W-38A T4 17763.78 77.28 48.27 9002.55 -6487.53 -4440.02 6.00 -6.00 0.00 179.98 17908.10 77.28 48.27 9034.33 -6393.83 -4334.95 0.00 0.00 0.00 0.00 W-38A Land Survey MD Incl Azim TVD Sys TVD !\tapN !\tapE VS DLS Tool/Comment ft deg deg ft ft ft ft ft deg/1 000 14150.00 54.64 221.16 8752.63 8668.30 5950090.28 606320.50 10364.06 0.00 Start Dir 12/100' : 14150' MD, 14175.00 54.98 224.81 8767.04 8682.71 5950075.14 606306.79 10384.24 12.00 MWD 14200.00 55.43 228.42 8781.31 8696.98 5950060.82 606292.09 10404.28 12.00 Start Dir 16.5/100' : 14200' M 14225.00 55.73 233.41 8795.45 8711.12 5950047.59 606276.29 10424.01 16.50 MWD 14250.00 56.23 238.35 8809.44 8725.11 5950035.72 606259.32 10443.25 16.50 MWD 14262.44 56.55 240.79 8816.33 8732.00 5950030.35 606250.46 10452.60 16.50 TSGR 14275.00 56.92 243.22 8823.22 8738.89 5950025.28 606241 .27 10461.88 16.50 MWD 14297.41 57.70 247.52 8835.33 8751.00 5950017.17 606224.25 10478.00 16.50 TSHU 14300.00 57.79 248.01 8836.71 8752.38 5950016.31 606222.23 10479.82 16.50 MWD 14325.00 58.85 252.70 8849.84 8765.51 5950008.87 606202.31 10496.98 16.50 MWD 14350.00 60.07 257.27 8862.55 8778.22 5950002.99 606181.61 10513.26 16.50 MWD 14375.00 61.44 261.73 8874.77 8790.44 5949998.71 606160.23 10528.57 16.50 MWD 14400.00 62.96 266.07 8886.43 8802.10 5949996.04 606138.29 10542.85 16.50 MWD 14425.00 64.61 270.29 8897.48 8813.15 5949995.00 606115.90 10556.01 16.50 MWD 14450.00 66.37 274.38 8907.86 8823.53 5949995.59 606093.17 10567.99 16.50 MWD 14475.00 68.24 278.37 8917.51 8833.18 5949997.82 606070.22 10578.72 16.50 MWD 14500.00 70.20 282.25 8926.38 8842.05 5950001.66 606047.17 10588.15 16.50 MWD 14502.82 70.42 282.69 8927.33 8843.00 5950002.20 606044.58 10589.13 16.50 TElL 14525.00 72.24 286.04 8934.43 8850.10 5950007.11 606024.15 10596.24 16.50 MWD 14550.00 74.35 289.74 8941 .62 8857.29 5950014.13 606001.26 10602.93 16.50 MWD 14575.00 76.52 293.36 8947.91 8863.58 5950022.68 605978.64 10608.20 16.50 MWD 14600.00 78.75 296.92 8953.26 8868.93 5950032.72 605956.39 10612.01 16.50 MWD 14625.00 81.01 300.42 8957.66 8873.33 5950044.21 605934.63 10614.35 16.50 MWD ') BP ) My Planning Report MAP Company: BP Amoco Date: 7/31/2002 Time: 10:16:29 Page: 3 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: W-38, True North Site: PB W Pad Vertical (TVD) Reference: 84.33' W-38a (Temp) 84.3 Well: W-38 Section (VS) Reference: Well (0.00N,0.00E,214.14Azi) Wellpath: Plan W-38A Survey Calculation Method: Minimum Curvature Db: Oracle Survey MD Incl Azirn TVD Sys TVD l\'lapN MapE VS DLS TooVComment ft deg deg ft ft ft ft ft deg/1 000 14636.36 82.06 302.00 8959.33 8875.00 5950049.89 605924.93 10614.93 16.50 TSAD 14650.00 83.31 303.88 8961.07 8876.74 5950057.07 605913.47 10615.21 16.50 MWD 14675.00 85.64 307.30 8963.47 8879.14 5950071.25 605893.03 10614.58 16.50 MWD 14700.00 87.97 310.71 8964.87 8880.54 5950086.66 605873.41 10612.46 16.50 MWD 14725.00 90.32 314.10 8965.24 8880.91 5950103.24 605854.71 10608.87 16.50 MWD 14750.00 92.66 317.50 8964.59 8880.26 5950120.89 605837.03 10603.82 16.50 MWD 14775.00 95.00 320.91 8962.92 8878.59 5950139.52 605820.45 10597.33 16.50 MWD 14800.00 97.31 324.34 8960.24 8875.91 5950159.04 605805.08 10589.46 16.50 MWD 14806.07 97.87 325.18 8959.44 8875.11 5950163.90 605801.53 10587.34 16.50 End Dir : 14806.07' MD, 8959. 14850.73 97.87 325.18 8953.32 8868.99 5950199.84 605775.73 10571.46 0.00 Start Dir 14/100' : 14850.73' 14875.00 97.72 328.60 8950.02 8865.69 5950219.77 605762.30 10562.16 14.00 MWD 14900.00 97.54 332.13 8946.70 8862.37 5950241.12 605749.74 10551.21 14.00 MWD 14925.00 97.32 335.65 8943.47 8859.14 5950263.21 605738.50 10538.91 14.00 MWD 14950.00 97.08 339.17 8940.33 8856.00 5950285.96 605728.64 10525.30 14.00 MWD 14975.00 96.82 342.69 8937.31 8852.98 5950309.29 605720.18 10510.44 14.00 MWD 15000.00 96.53 346.20 8934.40 8850.07 5950333.10 605713.17 10494.38 14.00 MWD 15025.00 96.21 349.71 8931.63 8847.30 5950357.31 605707.62 10477.18 14.00 MWD 15050.00 95.87 353.21 8929.00 8844.67 5950381.84 605703.57 10458.91 14.00 MWD 15075.00 95.51 356.71 8926.52 8842.19 5950406.57 605701.01 10439.63 14.00 MWD 15098.56 95.15 0.00 8924.33 8840.00 5950430.00 605699.99 10420.60 14.00 W-38A TD ken 15099.18 95.15 0.08 8924.27 8839.94 5950430.62 605699.98 10420.09 11.98 End Dir : 15099.18' MD, 8924. 15192.12 95.15 0.08 8915.94 8831.61 5950523.17 605698.73 10343.40 0.00 Start Dir 12/1 DO' : 15192.12' 15200.00 95.00 1.01 8915.24 8830.91 5950531.02 605698.68 10336.87 12.00 MWD 15225.00 94.53 3.99 8913.16 8828.83 5950555.92 605699.40 10315.66 12.00 MWD 15250.00 94.04 6.95 8911.29 8826.96 5950580.76 605701.41 10293.78 12.00 MWD 15275.00 93.55 9.92 8909.64 8825.31 5950605.48 605704.70 10271.31 12.00 MWD 15300.00 93.04 12.88 8908.20 8823.87 5950630.02 605709.27 10248.29 12.00 MWD 15325.00 92.53 15.84 8906.99 8822.66 5950654.29 605715.10 10224.80 12.00 MWD 15350.00 92.01 18.80 8906.00 8821.67 5950678.24 605722.18 10200.89 12.00 MWD 15375.00 91.48 21.75 8905.24 8820.91 5950701.80 605730.49 10176.63 12.00 MWD 15400.00 90.95 24.71 8904.70 8820.37 5950724.91 605740.00 10152.09 12.00 MWD 15425.00 90.42 27.66 8904.40 8820.07 5950747.50 605750.69 10127.34 12.00 MWD 15444.82 90.00 30.00 8904.33 8820.00 5950765.00 605759.99 10107.60 12.00 W-38A T1 15450.00 89.91 30.41 8904.33 8820.00 5950769.52 605762.53 10102.43 8.00 MWD 15500.00 89.08 34.32 8904.77 8820.44 5950812.13 605788.65 10052.47 8.00 MWD 15550.00 88.25 38.23 8905.94 8821.61 5950852.85 605817.62 10002.53 8.00 MWD 15600.00 87.42 42.15 8907.83 8823.50 5950891.49 605849.28 9952.85 8.00 MWD 15650.00 86.61 46.07 8910.43 8826.10 5950927.84 605883.49 9903.69 8.00 MWD 15683.89 86.07 48.73 8912.60 8828.27 5950951.10 605908.03 9870.77 8.00 End Dir : 15683.89' MD, 8912. 15700.00 86.07 48.73 8913.70 8829.37 5950961.87 605919.95 9855.22 0.00 MWD 15800.00 86.07 48.73 8920.55 8836.22 5951028.78 605993.95 9758.67 0.00 MWD 15900.00 86.07 48.73 8927.40 8843.07 5951095.68 606067.94 9662.13 0.00 MWD 16000.00 86.07 48.73 8934.25 8849.92 5951162.59 606141.94 9565.58 0.00 MWD 16100.00 86.07 48.73 8941.10 8856.77 5951229.49 606215.93 9469.03 0.00 MWD 16200.00 86.07 48.73 8947.96 8863.63 5951296.40 606289.92 9372.49 0.00 MWD 16213.29 86.07 48.73 8948.87 8864.54 5951305.29 606299.76 9359.65 0.00 Start Dir 6/100' : 16213.29' M 16220.35 86.40 49.00 8949.33 8865.00 5951310.00 606304.99 9352.85 6.00 W-38A T2 16227.18 86.45 49.41 8949.76 8865.43 5951314.53 606310.08 9346.27 6.00 End Dir : 16227.18' MD, 8949. 16300.00 86.45 49.41 8954.26 8869.93 5951362.63 606364.56 9276.15 0.00 MWD 16400.00 86.45 49.41 8960.45 8876.12 5951428.69 606439.37 9179.86 0.00 MWD 16500.00 86.45 49.41 8966.64 8882.31 5951494.75 606514.18 9083.58 0.00 MWD 16600.00 86.45 49.41 8972.83 8888.50 5951560.81 606588.99 8987.30 0.00 MWD ) BP ') My Planning Report MAP Company: BP Amoco Date: 7/31/2002 Time: 10:16:29 Page: 4 Field: Prudhoe Bay Co-ordinate(NE) Reference: Well: W-38, True North Site: PB W Pad Vertical (TVD) Reference: 84.33' W-38a (Temp) 84.3 Well: W-38 Section (VS) Reference: Well (0.00N,O.00E,214.14Azi) Wellpath: Plan W-38A Sunrey Calculation Method: Minimum Curvature Db: Oracle Survey MD Incl Azim TVD Sys TVD MapN MapE VS DLS Tool/Comment ft deg deg ft ft ft ft ft deg/1 000 16675.47 86.45 49.41 8977.50 8893.17 5951610.66 606645.45 8914.63 0.00 Start Dir 6/100' : 16675.47' M 16700.00 87.92 49.40 8978.70 8894.37 5951626.88 606663.81 8890.99 6.00 MWD 16734.94 90.02 49.40 8979.33 8895.00 5951650.00 606689.99 8857.29 6.00 W-38A T3 16753.73 90.02 48.27 8979.32 8894.99 5951662.57 606703.95 8839.12 6.00 End Dir : 16753.73' MD, 8979. 16800.00 90.02 48.27 8979.31 8894.98 5951693.88 606738.02 8794.25 0.00 MWD 16900.00 90.02 48.27 8979.28 8894.95 5951761.53 606811.65 8697.28 0.00 MWD 17000.00 90.02 48.27 8979.25 8894.92 5951829.19 606885.27 8600.31 0.00 MWD 17100.00 90.02 48.27 8979.23 8894.90 5951896.84 606958.90 8503.34 0.00 MWD 17200.00 90.02 48.27 8979.20 8894.87 5951964.50 607032.53 8406.36 0.00 MWD 17300.00 90.02 48.27 8979.17 8894.84 5952032.16 607106.16 8309.39 0.00 MWD 17400.00 90.02 48.27 8979.14 8894.81 5952099.81 607179.78 8212.42 0.00 MWD 17500.00 90.02 48.27 8979.11 8894.78 5952167.47 607253.41 8115.45 0.00 MWD 17551.46 90.02 48.27 8979.10 8894.77 5952202.28 607291.30 8065.54 0.00 Start Dir 6/100' : 17551.46' M 17600.00 87.10 48.27 8980.32 8895.99 5952235.11 607327.02 8018.50 6.00 MWD 17651.73 84.00 48.27 8984.33 8900.00 5952270.00 607364.99 7968.49 6.00 W-38A T4 17700.00 81.10 48.27 8990.59 8906.26 5952302.38 607400.23 7922.08 6.00 MWD 17722.52 79.75 48.27 8994.33 8910.00 5952317.40 607416.57 7900.55 6.00 45N 17750.00 78.10 48.27 8999.61 8915.28 5952335.65 607436.43 7874.39 6.00 MWD 17763.78 77.28 48.27 9002.55 8918.22 5952344.76 607446.34 7861.34 6.00 End Dir : 17763.78' MD, 9002. 17800.00 77.28 48.27 9010.52 8926.19 5952368.66 607472.36 7827.08 0.00 MWD 17894.48 77.28 48.27 9031 .33 8947.00 5952431.01 607540.21 7737.71 0.00 44N 17908.08 77.28 48.27 9034.33 8950.00 5952439.99 607549.98 7724.84 0.00 Total Depth: 17908.1' MD, 903 17908.09 77.28 48.27 9034.33 8950.00 5952439.99 607549.99 7724.84 0.00 41/2" 17908.10 77.28 48.27 9034.33 8950.00 5952440.00 607549.99 7724.82 0.00 W-38ALand Name +Ni-S WELL DETAILS SURVEY PROGRAM Depth Fm Depth To SurveylPlan Tool ANTI-COLLISION SETTINGS COMPANY DETAILS +E/-W Northing Easling Latitude Longitude Slot BP Amoco Interpolation MethodMD Interval: 25.00 Depth Range From: 14150.00 To: 17908.10 Maximum Range: 1987.68 Reference: Plan: W -38A wp05 MWD W-38 1675.49 1894.68 5958897.05 -256 -240 -200 -160 -120 -80 -40 -0 270 -40 -80 -120 -160 -200 -240 -256 611789.00 70'17'47.982N 149"05'4L116W 38 Calculation Method: Minimum Ouvature Enor System: ISCWSA Scan Method: Trav Cylinder North EITor Surface: Emptieat + Casing Warning Method: Rules Based 14150.00 17908.10 Planned: W-38A wp05 V5 0 WELLPATH DETAILS From Colour ToMD Plan W -38A 0 300 Parent Wellpath: W-38 300 600 Tie on MD: 14150.00 600 ~ 900 Rig: 84.33ft Ref. Datum: 84.33' W-38a (remp) 900 1200 V.section Origin Origin Starting 1200 -,--=, 1500 Angle +N/-S +EI-W From 1VD 1500 2000 214.\4" 0.00 0.00 0.00 2000 ~~~~<;"" 2500 2500 3000 3000 3500 3500 - 4000 LEGEND 4000 4500 - W-Il (W-Il), Major Risk - W-38 (W-38), NOERRORS 4500 5000 - Z.18(Z-18),MajorRisk 5000 6000 - PlanW.38A ~ W-38A wp05 0 6000 8000 8000 11000 11000 ~ 12000 12000 -~ 15000 .""-'" 90 .~ SECTION DETAILS See MD Inc Azi TVD +NI-S +EI-W DLeg TFace vSec Target I 14150.00 54.64 22LI6 8752.63 -8725.20 -559937 0.00 0.00 10364.06 2 14200.00 55.43 228.42 8781.31 .8754.24 -5628.22 12.00 84.49 10404.28 3 14806.07 97.87 325.\8 8959.44 -8643.87 -6117.23 16.50 87.28 1058734 4 14850.73 97.87 325.\8 895332 -8607.55 -6142.49 0.00 0.00 10571.46 5 15098.56 95.15 0.00 892433 -8376.26 -6214.81 14.00 9232 10420.60 W.38A TO ken 6 15099.18 95.15 0.08 8924.27 -8375.64 -6214.81 12.00 92.51 10420.09 7 15192.12 95.15 0.08 8915.94 -8283.07 -6214.69 0.00 0.00 10343.40 8 15444.82 90.00 30.00 890433 -8042.16 -6149.83 12.00 98.86 10107.60 W-38A TI 9 15683.89 86.07 48.73 8912.60 .7858.27 -5999.02 8.00 102.07 9870.77 10 16213.29 86.07 48.73 8948.87 -7509.91 -5602.03 0.00 0.00 9359.65 11 1622035 86.40 49.00 894933 -7505.28 -5596.73 6.00 39.09 9352.85 W-38A T2 12 16227.18 86.45 49.41 8949.76 -7500.83 -5591.57 6.00 82.74 9346.27 13 16675.47 86.45 49.41 8977.50 -7209.69 -5251.81 0.00 0.00 8914.63 14 16734.94 90.02 49.40 897933 .7171.02 -5206.69 6.00 -0.\2 8857.29 W-38A T3 15 16753.73 90.02 48.27 8979.32 -7158.65 -5192.54 6.00 -90.\9 8839.\2 16 17551.46 90.02 48.27 8979.10 -6627.69 -4597.17 0.00 0.00 8065.54 17 17651.73 84.00 48.27 8984.33 -6561.08 -4522.48 6.00 -179.97 7968.49 W-38A T4 18 17763.78 77.28 48.27 9002.55 -6487.53 -4440.02 6.00 179.98 7861.34 19 17908.10 77.28 48.27 903433 .6393.83 -4334.95 0.00 0.00 7724.82 W-38A Land . ~ ') BP Anticollision Report ) Company: BP Amoco Field: Prudhoe Bay Reference Site: PB W Pad Reference Well: W-38 Reference Wellpath: Plan W-38A Date: 7/31/2002 Time: 07:04:59 Page: Co-ordinate(NE) Reference: Vertical (TVD) Reference: Well: W-38, True North 84.33' W-38a {Temp} 84.3 Db: Oracle GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference - There ar~8fells in thir~al Plan & PLANNED PROGRAM Interpolation Method: MD Interval: 25.00 ft Error Model: ISCWSA Ellipse Depth Range: 14150.00 to 17908.10 ft Scan Method: Trav Cylinder North Maximum Radius: 1987.68 ft Error Surface: Ellipse + Casing Survey Program for Definitive Wellpath Date: 7/16/2002 Validated: No Version: 3 Planned From To Survey Toolcode Tool Name ft ft 43.53 14150.00 1 : Schlumberger GeT multishot GeT -MS Schlumberger GeT multishot 14150.00 17908.10 Planned: W-38A wp05 V5 MWD MWD - Standard Casing Points 1\1D TVD Diameter Hole Size Name ft ft in in 117908.09 9034.33 4.500 6.125 41/2" Summary i< - Offset Wellpath ----------> Reference Offset Ctr-Ctr No-Go Allowable ¡Site Well Wellpath l\1D l\1D Distance Area De,,'iation Warning ft ft ft ft ft PB W Pad W-11 W-11 V1 17639.07 12400.00 1905.85 471.97 1442.01 Pass: Major Risk PB W Pad W-38 W-38 V1 14168.56 14175.00 0.36 507.89 -507.66 F AI L: Major Risk PB Z Pad Z-18 Z-18 V1 15075.00 14150.00 1427.47 462.85 966.23 Pass: Major Risk Site: PB W Pad Well: W-11 Rule Assigned: Major Risk Wellpath: W-11 V1 Inter-Site Error: 0.00 ft Reference Offset Semi-Major Axis Ctr-Ctr No-Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO-HS Casing Distance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 17791.82 9008.72 12025.00 8176.19 85.22 58.70 111.58 63.31 1916.17 467.81 1469.34 Pass 17776.87 9005.43 12050.00 8191.18 85.15 58.88 112.18 63.91 1914.19 468.16 1465.85 Pass 17763.78 9002.55 12075.00 8206.14 85.09 59.07 112.78 64.50 1912.38 468.47 1462.55 Pass 17754.57 9000.56 12100.00 8221.06 85.04 59.22 113.37 65.10 1910.76 468.78 1459.72 Pass 17750.00 8999.61 12125.00 8235.94 85.01 59.40 113.96 65.69 1909.33 469.19 1456.91 Pass 17737.53 8997.12 12150.00 8250.76 84.95 59.54 114.54 66.27 1908.10 469.43 1454.69 Pass 17728.70 8995.45 12175.00 8265.56 84.90 59.70 115.12 66.85 1907.08 469.75 1452.39 Pass 17719.64 8993.82 12200.00 8280.33 84.85 59.85 115.70 67.43 1906.23 470.07 1450.29 Pass 17700.00 8990.59 12225.00 8295.08 84.74 59.97 116.27 68.00 1905.58 470.10 1448.94 Pass 17700.00 8990.59 12250.00 8309.79 84.74 60.16 116.83 68.56 1905.01 470.67 1446.75 Pass 17700.00 8990.59 12275.00 8324.46 84.74 60.35 117.39 69.12 1904.73 471.14 1444.95 Pass 17681.07 8987.84 12300.00 8339.09 84.64 60.48 117.94 69.67 1904.56 471.20 1444.15 Pass 17670.85 8986.52 12325.00 8353.73 84.59 60.62 118.48 70.21 1904.63 471.44 1443.23 Pass 17651.73 8984.33 12350.00 8368.45 84.49 60.71 119.03 70.76 1904.89 471.38 1443.01 Pass 17651.73 8984.33 12375.00 8383.26 84.49 60.85 119.56 71.29 1905.26 471.72 1442.14 Pass 17639.07 8983.09 12400.00 8398.12 84.42 60.96 120.10 71.83 1905.85 471.97 1442.01 Pass 17628.07 8982.15 12425.00 8413.02 84.37 61.07 120.63 72.35 1906.64 472.29 1442.04 Pass 17616.87 8981.32 12450.00 8427.99 84.31 61.18 121.15 72.88 1907.61 472.61 1442.28 Pass 17600.00 8980.32 12475.00 8443.08 84.23 61.28 121.67 73.40 1908.71 472.88 1442.91 Pass 17600.00 8980.32 12500.00 8458.26 84.23 61.43 122.18 73.91 1909.92 473.23 1443.01 Pass 17582.02 8979.58 12525.00 8473.52 84.12 61.53 122.69 74.42 1911.25 473.45 1444.00 Pass 17569.96 8979.27 12550.00 8488.87 84.06 61.65 123.20 74.92 1912.70 473.76 1444.85 Pass 17551.46 8979.10 12575.00 8504.29 83.95 61.76 123.70 75.42 1914.25 474.00 1446.08 Pass 17541.92 8979.10 12600.00 8519.72 83.90 61.94 124.18 75.91 1915.82 474.27 1446.76 Pass 17523.01 8979.11 12625.00 8535.16 83.80 62.12 124.67 76.40 1917.38 474.50 1447.56 Pass 17504.07 8979.11 12650.00 8550.60 83.69 62.30 125.16 76.88 1918.92 474.74 1448.37 Pass 17485.12 8979.12 12675.00 8566.11 83.59 62.48 125.64 77.37 1920.43 474.85 1449.29 Pass 17466.17 8979.12 12700.00 8581.65 83.50 62.65 126.13 77.85 1921.93 475.06 1450.13 Pass DATE INVOICE I CREDIT MEMO DESCRIPTION GROSS DATE CHECK NO. 8/01/02 H207041 VENDOR DISCOUNT NET H $100.00 H 207041 H/Ol/02 CK073102H Permit To DriI~Fee vJ2ßL-\ PIs contact Sandra StewmanX4750 for check pickup f,'j wt '--"" THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. TOTAL ~ $100.00 BPiE~PLORATION (ALASKA) INC. p.G>.emx 196612 ANCHORAGE, ALASKA 99519-6612 FIRST NATIONAL BANK OF ASHLAND AN AFFILIATE OF NATIONAL CITY BANK CLEVELAND, OHIO CONSOLIDATED COMMERCIAL ACCOUNT ~o 2002** . .~****~$100~00****.* NOT VALID AFTER 120 DAYS ç~-.:: ;..::\;: :::.::.;:: ::::~ ::::\J/::.. ~:~~;: :i.~:: ::~.~:::: ~ ::.:.< ::~1 ':':";':'~i ..j,~ ~':''''-C'''-~:'''''::'''.''::''''' ¡:iX1j\;fð:~J~~~~)¡>~i;;~ III 2 0 ? 0... .111 I: 0'" ~ 2 0 :I a q 5 I: 0 0 a ~... ~ q /II ) TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME f1¿~ W -::Jg¿ J PTD# :z.o¿- /9/ CHECK WHAT APPLIES ADD-ONS (OPTIONS) MULTI LATERAL v (If API number last two (2) digits are between 60-69) paOT (PH) HOLE SPACING EXCEPTION DRY DITCH SAMPLE Rev: 07110/02 C\jody\templates "CLUE" The permit is for a new wellbore segment of existing well fJß t:( (1.)- 3f Permit No/V9"'1') Y~API No. ð.2.1-.~ '07- <1 I Production should continue to be reported as a function. of the original API number stated above. In accordance with 20 AAC 25.005(t), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 70/80) from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. . (Company Name) assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. WELL PERMIT CHECKLIST COMPANY ¡f/Y WELL NAME=I'JII tû-.~f" L/ FIELD & POOL C!"7't1)ÇØ'r) INIT CLASS ~~<l.j I-ð/J ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . . 2. Lease number appropriate. . . .. . . . . . . . . . . . . . . 3. Unique well name and number. . . . . . . . . . . . . . . . . 4. Well located in a defined pool.. . . . . . . . . . . . . . . . . 5. Well located proper distance from drilling unit boundary. . . . 6. Well located proper distance from other wells.. . . . . . . . . 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . 9. Operator only affected party.. . . . . . . . . . . . . . . . . . 10. Operator has appropriate bond in force. . . " . . . . . . . . 11. Permit can be issued without conservation order. . . . . . . . 12. Permit can be issued without administrative approval.. . . . . (Service Well Only) 13. Well located wlin area & strata authorized by injection order #- (Service Well Only) 14. All wells w/in ~ mile area of review identified. . . . . . . . .. ENGINEERING APPR DATE tPt- Ü¿ APPR DATE ~A- î ¡alOl.. (Service Well Only) GEOLOGY APPR DATE ,(p ~~:J (ExPlorato~bnlÿ) Rev: 07/12/02 15. Conductor string provided. . . . . . . . . . . . . . . . . . . 16. Surface casing protects all known USDWs. . . . . . . . . . . 17. CMT vol adequate to circulate on conductor & surf csg. . . . . 18. CMT vol adequate to tie-in long string to surf csg. . . . . . . . 19. CMT will cover all known productive horizons. . . . . . . . . . 20. Casing designs adequate for C, T, B & permafrost. . " . . . 21. Adequate tankage or reserve pit.. . . . . . . . . . . . . . . . 22. If a re-drill, has a 10-403 for abandonment been approved. . . 23. Adequate wellbore separation proposed.. . . . . . . . '.' . . 24. If diverter required, does it meet regulations. . . . . . . . . . 25. Drilling fluid program schematic & equip list adequate. . . . . 26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . 27. BOPE press rating appropriate; test to ~ 00 psig. 28. Choke manifold complies w/API RP-53 (May 84). . . . . . . . 29. Work will occur without operation shutdown. . . . . . . . . . . 30. Is presence of H2S gas probable... . . . . . . . . . . . . . . 31. Mechanical condition of wells within AOR verified. . . . . . . . 32. Permit can be issued w/o hydrogen sulfide measures. . . . . 33. Data presented on potential overpressure zones. . . . . . . . 34. Seismic analysis of shallow gas zones. . . . . . . . . . . . . 35. Seabed condition survey (if off-shore). . . . . . . . . . . . . . 36. Contact name/phone for weekly progress reports. . . . . . . . GEOLOGY: RP~ PETROLEUM ENGINEERING: TEM RESERVOIR ENGINEERING JDH~ SFD- WGA \dGA- G :\geology\perm its\checklist.doc PROGRAM: Exp - Dev,K. Redrll - Re-Enter - Serv - Wellbore seg ~ GEOL AREA if't t"'} UNIT# // h<' ~ ON/OFF SHORE ~ ~N Y N Y N Y N Y N Y N Y N Y N Y N Y N Y N VJ N }{ I'J,.4. ¥-N- -¥--far -¥-tr" N/* ~ ~ D~M-l 4-( ¥)::..N Q¿N +-N- /\1./ k Y N ¡n~ MvJ f.G, r~~ . I~ f/;l.c,f g 'l77Cl pw', fVlA-'{ CUv'^- ks-f- 350û O~', Ydj¿ -¥--W- At/It- C;>N }1 ,v.,4. ) UIC ENGINEER JBR COMMISSIONER: COT. . DTS 09/17/02- Comments/Instructions: MJW ) ') Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special. effort has been made to chronologically organize this category of information. ) ) ó? tJd-/C¡¡ flip 70 Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Thu Mar 27 10:19:56 2003 Reel Header Service name. . . . . . . . . . . . .LISTPE Da t e. . . . . . . . . . . . . . . . . . . . . 03 / 03 /2 7 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name............... .UNKNOWN Continuation Number..... .01 Previous Reel Name...... .UNKNOWN Comments................ .STS LIS Tape Header Service name. . . . . . . . . . . . .LISTPE Da te. . . . . . . . . . . . . . . . . . . . . 03/03/27 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name.. ............. .UNKNOWN Continuation Number..... .01 Previous Tape Name...... .UNKNOWN Comments................ .STS LIS Physical EOF Comment Record TAPE HEADER Prudhoe Bay MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWDRUN 2 AK-MW-22164 T. MCGUIRE A. MADSEN JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWDRUN 5 AK-MW-22164 T. MCGUIRE L. VAUGHN # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: MSL 0) # Writing Library. Scientific Technical Services Writing Library. Scientific Technical Services W-38A 500292180701 BP Exploration¡ Inc. Sperry Sun 27-MAR-03 MWDRUN 3 AK-MW-22164 T. MCGUIRE A. MADSEN MWDRUN 4 AK-MW-22164 T. MCGUIRE A. MADSEN 21 11N 12E 3924 1453 .00 88.11 54.21 ) ) WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 8.500 9.625 13355.0 6.100 7.000 14035.0 # REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD). 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. THIS WELL WAS DRILLED OFF OF A WHIPSTOCK, THE TOP OF WHICH WAS AT ABOUT 13339'MD / 8295'TVD IN THE W-38 WELLBORE. 4. MWD RUN 1 WAS DIRECTIONAL ONLY. NO DATA IS PRESENTED 5. MWD RUN 2 COMPRISED DIRECTIONAL AND DUAL GAMMA RAY (DGR), UTILIZING GEIGER-MUELLER TUBE DETECTORS. 4. MWD RUNS 3 - 5 COMPRISED DIRECTIONAL WITH DGR¡ ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4)¡ AND PRESSURE WHILE DRILLING ( PWD) . 6. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER E-MAIL FROM D. SCHNORR, BP ALASKA, INC., DATED 11/1/02. MWD DATA ARE CONSIDERED PDC. 7. MWD RUNS 1 - 5 REPRESENT WELL W-38A WITH API#: 50-029-21807-01. THIS WELL REACHED A TOTAL DEPTH (TD) OF 17700'MD / 9006'TVD. SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC = SMOOTHED GAMMA RAY COMBINED. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY SFXE = SMOOTHED FORMATION EXPOSURE TIME. SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS. $ (EXTRA SHALLOW SPACING) . (SHALLOW SPACING) . (MEDIUM SPACING) . (DEEP SPACING). File Header Service name............ .STSLIB.OOl Service Sub Level Name. . . Version Number.......... .1.0.0 Date of Generation...... .03/03/27 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted and DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR ROP FET RPD RPM 1 clipped curves¡ all bit runs merged. .5000 START DEPTH 13332.5 13367.0 13989.5 13989.5 13989.5 STOP DEPTH 17646.0 17700.0 17653.0 17653.0 17653.0 ) ) RPS RPX $ 13989.5 13989.5 17653.0 17653.0 # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED PBU MWD MWD MWD MWD $ DATA SOURCE TOOL CODE BIT RUN NO 2 3 4 5 MERGE TOP 13332.5 13982.5 14680.5 15092.5 MERGE BASE 14035.0 14733.0 15145.0 17700.0 # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type.. ...... ..........0 Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 13332.5 17700 15516.3 8736 13332.5 17700 ROP MWD FT 0.11 1680.83 71.6659 8667 13367 17700 GR MWD API 18.78 541.95 69.212 8628 13332.5 17646 RPX MWD OHMM 1.99 1958.42 11.6702 7328 13989.5 17653 RPS MWD OHMM 2.21 1990.96 11.3703 7328 13989.5 17653 RPM MWD OHMM 0.56 2000 31.9306 7328 13989.5 17653 RPD MWD OHMM 0.02 2000 25.3102 7328 13989.5 17653 FET MWD HOUR 0.46 117.51 3.67915 7328 13989.5 17653 First Reading For Entire File......... .13332.5 Last Reading For Entire File... .... ....17700 File Trailer Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/03/27 ") Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/03/27 Maximum Physical Record. .65535 File Type. . . . . . . . . . . . . . . . LO Previous File Name...... .STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 2 ) header data for each bit run in separate files. 2 .5000 START DEPTH 13332.5 13367.0 STOP DEPTH 13999.5 14035.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: 15-0CT-02 Insite 66.37 Memory 14035.0 13332.0 14035.0 52.4 53.7 TOOL NUMBER 155790 8.500 13355.0 LSND 11.20 42.0 8.8 600 3.2 1.950 .770 3.300 1.800 68.0 183.0 68.0 68.0 ) ) # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type........ ..........0 Data Specification Block Type.....O Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing...... .............. .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD020 FT/H 4 1 68 4 2 GR MWD020 API 4 1 68 8 3 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 13332.5 14035 13683.8 1406 13332.5 14035 ROP MWD020 FT/H 0.11 335.53 102.388 1337 13367 14035 GR MWD020 API 55.95 171.85 116.98 1335 13332.5 13999.5 First Reading For Entire File........ ..13332.5 Last Reading For Entire File......... ..14035 File Trailer Service name............ .STSLIB.002 Service Sub Level Name... Version Nurnber.......... .1.0.0 Date of Generation...... .03/03/27 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.003 Physical EOF File Header Service name....... ..... .STSLIB.003 Service Sub Level Name... Version Number......... ..1.0.0 Date of Generation...... .03/03/27 Maximum Physical Record..65535 File Type............... .LO Previous File Name...... .STSLIB.002 Comment Record FILE HEADER ') FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR RPM RPD RPS RPX FET ROP $ 3 ) header data for each bit run in separate files. 3 .5000 START DEPTH 13982.5 13989.5 13989.5 13989.5 13989.5 13989.5 14035.5 STOP DEPTH 14680.0 14687.0 14687.0 14687.0 14687.0 14687.0 14733.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record 21-0CT-02 Insite 66.37 Memory 14733.0 14035.0 14733.0 52.1 86.1 TOOL NUMBER 65041 148574 6.100 14035.0 Water 8.40 40.0 9.0 450 10.1 Based 1.200 13.610 2.250 1.450 70.0 184.0 70.0 70.0 ) ) Data Record Type............ ......0 Data Specification Block Type.....O Logging Direction................ . Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 RPX MWD030 OHMM 4 1 68 12 4 RPS MWD030 OHMM 4 1 68 16 5 RPM MWD030 OHMM 4 1 68 20 6 RPD MWD030 OHMM 4 1 68 24 7 FET MWD030 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 13982.5 14733 14357.8 1502 13982.5 14733 ROP MWD030 FT/H 0.54 360.25 47.1475 1396 14035.5 14733 GR MWD030 API 19.82 541.95 92.4144 1396 13982.5 14680 RPX MWD030 OHMM 1.99 1958.42 31.2922 1396 13989.5 14687 RPS MWD030 OHMM 2.21 1990.96 25.5986 1396 13989.5 14687 RPM MWD030 OHMM 0.56 2000 136.107 1396 13989.5 14687 RPD MWD030 OHMM 0.02 2000 98.3915 1396 13989.5 14687 FET MWD030 HOUR 0.78 117.51 9.73824 1396 13989.5 14687 First Reading For Entire File....... ...13982.5 Last Reading For Entire File......... ..14733 File Trailer Service name............ .STSLIB.003 Service Sub Level Name... Version Number..... ..... .1.0.0 Date of Generation...... .03/03/27 Maximum Physical Record. .65535 File Type............... .LO Next File Name.... ...... .STSLIB.004 Physical EOF File Header Service name. ........... .STSLIB.004 Service Sub Level Name. . . Version Number......... ..1.0.0 Date of Generation...... .03/03/27 Maximum Physical Record. .65535 File Type................LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and 4 log header data for each bit run in separate files. BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR FET RPD RPM RPS RPX ROP $ ) 4 .5000 START DEPTH 14680.5 14687.5 14687.5 14687.5 14687.5 14687.5 14733.5 STOP DEPTH 15092.0 15099.0 15099.0 15099.0 15099.0 15099.0 15145.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER ( FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ # BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type........ ..........0 Data Specification Block Type... ..0 Logging Direction................ . Down ) 23-0CT-02 Insite 66.37 Memory 15145.0 14733.0 15145.0 88.7 92.2 TOOL NUMBER 65041 148574 6.130 14035.0 Water 8.40 40.0 9.0 450 10.0 Based 1.200 .430 2.250 1.450 70.0 208.0 70.0 70.0 ) ) Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value.... ... .... .......... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD040 FT/H 4 1 68 4 2 GR MWD040 API 4 1 68 8 3 RPX MWD040 OHMM 4 1 68 12 4 RPS MWD040 OHMM 4 1 68 16 5 RPM MWD040 OHMM 4 1 68 20 6 RPD MWD040 OHMM 4 1 68 24 7 FET MWD040 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 14680.5 15145 14912.8 930 14680.5 15145 ROP MWD040 FT/H 0.79 211.57 73.6865 824 14733.5 15145 GR MWD040 API 18.78 154.15 30.7791 824 14680.5 15092 RPX MWD040 OHMM 3.65 11.98 5.98365 824 14687.5 15099 RPS MWD040 OHMM 3.43 10.18 5.60738 824 14687.5 15099 RPM MWD040 OHMM 3.38 11.66 5.52791 824 14687.5 15099 RPD MWD040 OHMM 3.71 11.2 5.79558 824 14687.5 15099 FET MWD040 HOUR 0.52 27.98 4.06364 824 14687.5 15099 First Reading For Entire File........ ..14680.5 Last Reading For Entire File........ ...15145 File Trailer Service name............ .STSLIB.004 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .03/03/27 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.005 Physical EOF File Header Service name........... ..STSLIB.005 Service Sub Level Name. . . Version Number. ........ ..1.0.0 Date of Generation. ..... .03/03/27 Maximum Physical Record. .65535 File Type.... ........... .LO Previous File Name. ..... .STSLIB.004 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # 5 header data for each bit run in separate files. 5 .5000 ) FILE SUMMARY VENDOR TOOL CODE GR RPD RPM RPS RPX FET ROP $ START DEPTH 15092.5 15099.5 15099.5 15099.5 15099.5 15099.5 15145.5 STOP DEPTH 17646.0 17653.0 17653.0 17653.0 17653.0 17653.0 17700.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type........ ..........0 Data Specification Block Type.....O Logging Direction.. .............. . Down Optical log depth units.......... .Feet Data Reference Point. ............ . Undefined Frame Spacing............... ..... .60 .1IN ) 27-0CT-02 Insite 66.37 Memory 17700.0 15145.0 17700.0 77.5 94.7 TOOL NUMBER 62456 73634 6.130 14035.0 Water 8.50 40.0 8.6 500 8.3 Based 1.080 .400 1.650 .700 70.0 201.2 70.0 70.0 ) ) Max frames per record............ . Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Service Order Units FT FT/H API OHMM OHMM OHMM OHMM HOUR Size Nsam 4 1 4 1 4 1 4 1 4 1 4 1 4 1 4 1 Rep Code 68 68 68 68 68 68 68 68 Offset 0 4 8 12 16 20 24 28 Channel 1 2 3 4 5 6 7 8 Name DEPT ROP GR RPX RPS RPM RPD FET MWD050 MWD050 MWD050 MWD050 MWD050 MWD050 MWD050 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 15092.5 17700 16396.3 5216 15092.5 17700 ROP MWD050 FT/H 0.43 1680.83 69.9999 5110 15145.5 17700 GR MWD050 API 18.89 413.35 56.5393 5108 15092.5 17646 RPX MWD050 OHMM 2.76 23.74 7.22483 5108 15099.5 17653 RPS MWD050 OHMM 3.2 1801.63 8.41134 5108 15099.5 17653 RPM MWD050 OHMM 2.66 35.11 7.71863 5108 15099.5 17653 RPD MWD050 OHMM 2.63 25.76 8.48534 5108 15099.5 17653 FET MWD050 HOUR 0.46 25.29 1.96119 5108 15099.5 17653 First Reading For Entire File........ ..15092.5 Last Reading For Entire File......... ..17700 File Trailer Service name............ .STSLIB.005 Service Sub Level Name.. . Version Number.......... .1.0.0 Date of Generation...... .03/03/27 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.006 Physical EOF Tape Trailer Service name............ .LISTPE Da te. . . . . . . . . . . . . . . . . . . . . 03/03/27 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number..... .01 Next Tape Name.......... .UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name...... """ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .03/03/27 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name... ............ . UNKNOWN Continuation Number..... .01 Next Reel Name. . . . . . . . . . .UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File ) ')