Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout194-138 •
bp
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
December 21, 2010 5t) JAN 2 4 lU1
Mr. Tom Maunder k": ;" ,
Alaska Oil and Gas Conservation Commission
333 West 7 Avenue
JAN 0 ; ?fit
Anchorage, Alaska 99501 n
°�,c 'PJ. �tin� a �`k, ssion
Subject: Corrosion Inhibitor Treatments of GPB DS 11 Annnfo-i(je
Dear Mr. Maunder,
Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB DS
11 that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Gerald
Murphy, at 659 -5102.
Sincerely,
Torin Roschinger
BPXA, Well Integrity Coordinator
0 •
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off
Report of Sundry Operations (10 -404)
DS -11
Date: 12/21/10
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD # API # cement _ pumped cement date inhibitor sealant date
ft bbls ft na pal
11 -01A 1921120 50029206440100 NA Sealed NA NA 6/25/2010
11 -02 1811280 50029206490000 NA Sealed NA NA 6/25/2010
11 -03A 1911520 50029206660100 NA Sealed NA NA 6/25/2010
11-04A 1940230 50029204800100 NA Sealed NA NA 6/25/2010
11 -05A 1961570 50029206700100 NA Sealed NA NA 6/25/2010
11 -06A 2042250 50029206740100 NA Sealed NA NA 6/25/2010
11 -07 1811770 50029206877000 NA Sealed NA NA 6/25/2010
11 -08 1842290 50029212450000 NA Sealed NA NA 6/27/2010
11 -09A 1961280 50029214020100 NA 25 NA 42.50 6/29/2010
11 -10 1851590 50029213940000 NA 5 NA 28.90 6/30/2010
11 -11 1851410 50029213820000 NA Sealed NA NA 6/27/2010
11 -12 1841950 50029212120000 NA Sealed NA NA 9/12/2010
11 -13A 1921100 50029212290100 NA Sealed NA NA 9/12/2010
11 -16 1860780 50029215817000 NA Sealed NA NA 6/27/2010
11 -17A 2020320 50029215980100 NA Sealed NA NA 6/27/2010
11 -18 1861120 50029216070000 NA Sealed NA NA 6/27/2010
11 -22A 1950870 50029220356000 NA 1 NA 9.35 7/1/2010
11 -23A 1940810 50029216100100 NA Sealed NA NA 7/1/2010
11 -24A 1932040 50029216230100 NA Sealed NA NA 6/26/2010
11 -25A 1990820 50029204880200 NA Sealed NA NA 6/26/2010
11 -26 1861340 50029216280000 NA 1.9 NA 5.10 6/28/2010
•
11 -27 1861480 50029216380000 NA 3.5 NA 11.90 6/28/2010
11 -28A 2000950 50029219580100 NA Sealed NA NA 6/28/2010
11 -29 1940250 50029224660000 NA 0.2 NA 1.70 6/28/2010
11 -31A 1961830 50029225090100 NA 1.4 NA 6.80 6/28/2010
11 -32 1941310 50029225120000 NA 6.7 NA 59.50 6/30/2010
s 11 -33 1940900 50029224900000 NA 0.5 NA 2.55 6/30/2010
1 1 -34 1941380 50029225160000 NA -
0.5 NA 3.40 11/27/2009
11 -35 1940650 50029224760000 NA 0.6 NA 5.10 6/30/2010
11 -37 1961740 50029227160000 NA 4 NA 42.50 7/1/2010
11 -38A 1982160 50029227230100 NA 2.1 NA 22.10 6/28/2010
• STATE OF ALASKA ~F~} ~,
ALASKA OIL AND GAS CONSERVATION G®11~1~~'KI~~
REPORT OF SUNDRY Wc~'~~IQNiS=;i~~rus
~~~
~ ~3-a9
1. Operations Abandon ~ Repair Well ~ , Plug Perforations ~ Stir(f>~t Other ~ cement top job
Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver Time Extension (~
Change Approved Program ~ Operat. Shutdown ~ Perforate ~ Re-enter Suspended Well []
2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number:
Name: Development r Exploratory ~ 194-1380 ~
3. Address: P.O. Box 196612 Stratigraphic ~ Service 6. API Number:
Anchorage, AK 99519-6612 50-029-22516-00-00
7. KB Elevation (ft): 9. Well Name and Number:
63.8 KB ~ PBU 11-34 '
8. Property Designation: 10. Field/Pool(s): ,
ADLO-028326 PRUDHOE BAY Field/ PRUDHOE OIL Pool
11. Present Well Condition Summary:
Total Depth measured 12832 ~ feet Plugs (measured) 10336'
true vertical 8789.14 , feet Junk (measured) 12827'
Effective Depth measured 12820 feet
true vertical 8789 feet
Casing Length Size MD TVD Burst Collapse
Conductor 75' 20" Surface - 110' Surface - 110' 1490 470
Surface 4017' 10-3/4" 45.5# NT-80 Surface - 4052' Surface - 3687' 5210 2480
Intermediate 11251' 7-5/8" 29.7# NT-95HS Surface - 11282' Surface - 8808' 8180 5120
Liner 1658' 4-1/2" 12.6# 13CR-80 11162' - 12820' 8800
' - 8789' 8430 7500
~y
Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _
True Vertical depth: _ _ _
Tubing: (size, grade, and measured depth) 4-1/2" 12.6# 13CR-80 SURFACE - 10348'
0 0 -
Packers and SSSV (type and measured depth) 7-5/8"X4-1/2" BAKER S-3 PKR 10172'
7-5/8"X4-1/2" TIW HBBP PKR 10275'
0 0
0 0
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure
Prior to well operation: SI
Subsequent to operation: SI
14. Attachments: 15. Well Class after proposed work:
Copies of Logs and Surveys Run Exploratory ~ Development ~ - Service
Daily Report of Well Operations X 16. Well Status after proposed work:
Oil r ~ Gas WAG r GINJ WINJ WDSPL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
N/A
Contact Gary Preble
Printed Name Gary Prebl Title Data Management Engineer
Signature ~~ Phone 564-4944 Date 2/19/2009
Form 10-404 Rev' ed 04/2006 t ~ Submit Original Only
11-34
194-138
PERF ATTACHMENT
•
Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Top Tvd Depth Base
11-34 11/27/94 SL 11,255. 12,797. 8,806.27 8,787.92
11-34 2/14/98 APF 11,070. 11,090. 8,786.24 8,790.1
11-34 3/31/98 APF 10,940. 10,966. 8,759.67 8,765.06
11-34 3/31/98 APF 10,994. 11,019. 8,770.81 8,775.89
11-34 3/31/98 APF 11,019. 11,044. 8,775.89 8,780.99
11-34 2/2/08 BPS 10,336. 12,797. 8,570.06 8,787.92
11-34 9/15/08 SPS 10,326. 10,336. 8,564.35 8,570.06
AB ABANDONED PER PERF
APF ADD PERF RPF REPERF
BPP BRIDGE PLUG P ULLED SL SLOTTED LINER
BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED
FCO FILL CLEAN OUT SPS SAND PLUG SET
FIL FILL SQF SQUEEZE FAILED
MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE
MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED
MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN
OH OPEN HOLE
•
11-34
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
ACTIVITYDATE ~ SUMMARY
2/14/2009T/I/0= SSV/300/0. Temp= SI. Prep for FB top job -install heater, spill
containment (cement top job -post RWO). No heater on location. Heater
',arrived @ 08:00. Used SS, chipping tools to remove 28" gravel/ cement from
conductor (90% ravel . Conductor depth is just below a 12" collar. Applied
{ 0 psi to OA, diesel/ gas bubbled up in cellar (1/2 "diesel). Verified flow
rouq to return tank. Left heat in cellar under visauene.
SV,WV,SSV=C. IA,OA=OTG. NOVP.
2/16/2009T/I/0= SSV/300/0. Temp= SI. Assist SLB w/ SQZ /cement top off (cement top
'job-post RWO). AL SI @ CSG. Pumped 1,5 bbls G cement into OA, took
returns to conductor. OAP increase to 500 psi, flow stopped. VAC'ed cement
below top of conductor. Flushed OA w/ C-pump, Flushed hardline, choke w/
FW, Vac'ed hardline, choke. Loaded OA, hardline, choke w/ meth. Blew down
hardline, choke w/ LG. Left heat in cellar.
SV,WV,SSV,ALV=C. MV=O. IA,OA=OTG. NOVP.
FLUIDS PUMPED
BBLS
2 G Cement
2 Total
' ~~
~~
~ ~
STATE OF ALASKA
A OIL AND GAS CONSERVATION CO SION '
REP RT OF SUNDRY WELL OPE~TIONS
1. Operations Performed:
^ Abandon ®Repair Well - ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well
® Alter Casing ®Pull Tubing - ^ Perforate New Pool ^ Waiver ^ Other
^ Change Approved Program ^ Operation Shutdown ^ Perforate ^ Time Extension
2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number:
BP Exploration (Alaska) Inc. ®Development - ^ Exploratory 194-138
3. Address: ^ Service ^ Stratigraphic 6. API Number:
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22516-00-00
7. KB Elevation (ft):
63.8' - 9. Well Name and Number:
PBU 11-34 '
8. Property Designation: 10. Field /Pool(s):
ADL 028326 - Prudhoe Bay Field / Prudhoe Bay Pool
11. Present well condition summary
Total depth: measured 12832'- feet
true vertical 8789' ` feet Plugs (measured) 10336'
Effective depth: measured 12820' feet Junk (measured) 12827'
true vertical 8789' feet
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 75' 20" 110' 110' 1490 470
Surface 4017' 10-3/4" 4052' 3687' 5210 2480
Intermediate 11251' 7-5/8" 11282' 8808' 8180 5120
Production
Liner 1658' 4-1/2" 11162' - 12820' 8800' - 8
789' 8430 7500
r
~~.dd
Perforation Depth MD (ft): 10940' - 12797
Perforation Depth TVD (ft): 8760' - 8788'
4-1/2", 12.6# 13Cr80 10348'
Tubing Size (size, grade, and measured depth):
Packers and SSSV (type and measured depth): 7-5/8" x4-1/2" Baker'S-3' packer; 10171 ;
7-518" x 4-1/2" TIW'HBBP' packer. 10275'
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment description including volumes used and final pressure:
Cut & pulled tubing from 10240'. Cut, pull & dress off 7-5/8" casing to 3952'. Run 7-5/8" (29.7#, L-80) tieback to surface & cmt w/ 150 Bbls Class
'G' (842 cu ft / 720 sx). Run new chrome completion. (Pulling the plug has not successful, but a prong was retrieved allowing some production.)
13. Re resentative Dail Avera a Production or In'ection Data
Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure
Prior to well operation:
Subsequent to operation: 446 21,313 1,262 1,400 1,119
14. Attachments: ^ Copies of Logs and Surveys run 15. Well Class after work:
^ Exploratory ®Development ^ Service
® Daily Report of Well Operations
16. Well Status after work:
® Well Schematic Diagram ®Oil - ^ Gas ^ WAG ^ GINJ ^ WINJ ^ WDSPL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number. or wA if C.O. Exempt:
Contact Mackie Derrick, 564-5891 308-321
Printed Name T rrie Hubble Title Drillin Technologist
~ Prepared By NameMumber:
a
Signature Phone 564-4628 Date t7~ Terrie Hubble 564-4628
Form 10-404 Revised 04/2006 L k' u ~ ~.,.. Submit Original Only
...r .~,;~~~_~ z;~. F1~~, ~ LJ~B ~~
11-34, Well History (Pre Rig Workover)
Date Summary
9/10/2008 T/I/0=520/450/10. SI. T&IA FL's for FB. TBG FL C~3 222' (4 bbls), IA FL C 24' (1 bbl). Katch Kan
installed in cellar.
9/12/2008 T/I/0= 500/400/0+. Temp= SI. CMIT TxIA PASSED to 3500 psi, LLR if fails (PRE RWO). AL spool
removed. Used 13.26 bbls of diesel to pressure T/IA from 500/400 psi to 3500/3500 psi. T/IA lost 40/60
in 1st 15 minutes, 20/20 psi in 2nd 15 minutes for a total lost of 60/80 psi in 30 minutes. Bled T & IAP
from 3420/3440 psi in 40 minutes (12.5 bbls). OAP unchanged. Final WHPs= 380/280/0. SV,WV=C.
SSV,MV=O. IA,OA=OTG. NOVP.
9/12/2008 T/I/0=500/300/0, Temp=Sl. PPPOT-T (PASS), PPPOT-IC (PASS). Pre RWO.
PPPOT-T: Stung into test port (1100 psi), bled to 0 psi (gas). Functioned LDS (ET style), all moved
freely (2.5"). Pumped through void, clean returns. Pressured void to 5000 psi for 30 min test, lost 200
psi in 15 min, lost 50 psi in second 15 min (PASS). Bled void to 0 psi.
PPPOT-IC: Stung into test port (400 psi), bled to 0 psi (gas). Functioned LDS (ET style), all moved freely
(2 5/8"). Pumped through void, clean returns. Pressured void to 3500 psi for 30 min test, lost 100 psi in
15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi.
9/15/2008 WELL S/I ON ARRIVAL. DRIFT TO 10314' SLM/ 10336' MD(PXN) W/ 3.70" CENT. DUMPED 100 LBS
OF SLUGGETS ~ 10314' SLM/ 10336' MD. SET 4.5 JUNK CATCHER C«~ 10297' SLM. WELL LEFT S/I
NOTIFY DSO.
9/18/2008 WELL SI ON ARRIVAL SSV CLOSED. INITIAL T/I/O 400/360/0. PJSM, RU ELINE W/3.65 JET
CUTTER. MISRUN ON FIRST ATTEMPT 3.2 HRS LOST TIME (NPT). RU SECOND CUTTER, CUT
TUBING AT 10240'. GOOD SURFACE INDICATION OF CUT, RD ELINE, VERIFY VALVE POSITIONS
W/ DSO. WELL SI UPON DEPARTURE, SSV CLOSED, SWAB CLOSED, MASTER OPEN, WING
CLOSED. C37FINAL T/I/O = 350/290/0 JOB COMPLETE.
9/20/2008 T/I/0=300/290/0 Circ well, CMIT TxIA PASSED to 2000 psi (Pre RWO_) Pumped 4 bbls neat meth
followed by 664 bbls 9.3# brine and 5 bbls diesel down Tbg through jet cut up IA and to flowline, U-tubed
diesel into IA for freeze protect. Freeze protected flowline with 10 bbls warm diesel.
CMIT Tx IA to 2000 psi. Pumped 5.4 bbls diesel down IA to pressure up to 2000 psi.. Tbg lost 0 psi
and IA gained 20 psi in 1st 15 mins, T/IA did not lose/gain any pressure in 2nd 15 min. Bled pressures.
Bled back -4.5 bbls. FWHP's=0/0/0 ~`~Tags hung and valves checked for position upon departure"'`*
9/21/2008 T/I/0=0/0/0. Set 4" CIW H BPV. Pre-Rig.
9/23/2008 T/I/0= SSV/20/VAC. Temp= SI. OA FL (pre-RWO). AL,flowline & wellhouse disconnected and
removed. OA FL C~ 60' (3 bbls).
Page 1 of 1
BP EXPLORATION Page 1 of 12
Operations Summary Report
Legal Well Name: 11-34
Common Well Name: 11-34 Spud Date: 10/30/1994
Event Name: WORKOVER Start: 10/13/2008 End:
Contractor Name: DOYON DRILLING INC. Rig Release: 10/26/2008
Rig Name: DOYON 14 Rig Number:
Date From - To ~~ Hours Task Code NPT Phase Description of Operations
10/13/2008 03:00 - 05:00 2.00 MOB P PRE Install Bale brace. Remove ODS rollers. LD rail brace.
-LD Top Drive.
05:00 - 06:30 1.50 MOB P PRE Install rollers on Carriage & hang on Blocks.
06:30 - 07:30 1.00 MOB P PRE RD: Windwall barces, Lights, Cameras & Tool rack.
07:30 - 09:00 1.50 MOB P PRE Raise & Pin "C" section.
09:00 - 10:00 1.00 MOB P PRE PU Bridle line sheave.
-MU Bridle lines. Bridle up.
10:00 - 11:30 1.50 MOB P PRE Skid Rig floor.
11:30 - 12:00 0.50 MOB P PRE Attach front Boosters.
12:00 - 12:30 0.50 MOB P PRE PJSM w/ Pad operator.
-Move off of well 18-05. Spot Rig on Pad.
12:30 - 14:00 1.50 MOB P PRE PJSM. Remove Cellar doors. Install rear Boosters.
14:00 - 15:30 1.50 MOB P PRE PJSM. Lay over Wind walls.
-Prepare Derrick to lay over.
15:30 - 18:00 2.50 MOB P PRE Lay over Derrick. Tie up Blocks & Derrick lines.
18:00 - 22:00 I 4.00 I MOB I P
22:00 - 00:00 2.00 MOB P
10/14/2008 00:00 - 04:00 4.00 MOB P
04:00 - 05:30 1.50 MOB P
05:30 - 07:00 1.50 RIGU P
07:00 - 08:30 1.50 RIGU P
08:30 - 10:00 1.50 RIGU P
10:00 - 10:30 0.50 RIGU P
10:30 - 12:00 1.50 RIGU P
12:00 - 13:00 1.00 RIGU P
13:00 - 15:00 2.00 RIGU P
15:00 - 18:00 I 3.00 RIGU P
18:00 - 22:00 4.00 RIGU P
22:00 - 00:00 2.00 RIGU P
110/15/2008 100:00 - 03:00 I 3.001 RIGU I P
03:00 - 04:30 ~ 1.50 ~ RIGU ~ P
04:30 - 06:00 1.50 RIGU P
06:00 - 07:00 1.00 RIGU P
-Remove Pins from Stabbing board.
-Tuboscope to MPI Pad eyes.
PRE Wait to move Rig per security.
- (Gas Venting on "K" ,Security will not allow West Dock road
to be blocked).
PRE Move Rig from DS -18 to West Dock road.
PRE Move Rig from West Dock road to in front of Tarmac camp.
PRE Move Rig From in front of Tarmac camp to DS 11.
PRE Remove front & rear Boosters. Hang Mousehole.
-Install cellar heaters & doors.
PRE Raise "A" legs. Unchain Blocks.
-Raise Derrick.
PRE Raise & pin Wind walls.
PRE Skid Rig floor to moving position.
PRE Spot Rig over well 11-34.
-T/I/O = 0/0/0
PRE PJSM on Skid Rig.
-Skid Rig floor into Drlg position.
PRE Position conveyor. Berm & spot Rock washer.
-Connect service lines for Rig floor.
-(Air, Steam, Water, Hydraulics).
PRE RD Bridle Sheave & line.
-Lower "C" section. Hang Bridle lines.
-RD Block carriage.
PRE Hang Top Drive. Connect service loop.
-Fill Pits w/ 9.3 ppg NaCI.
PRE Hang lights & Wind wall supports.
-Install Top Drive rollers.
-Install Rail brace.
PRE RU Rig floor. MU lines under Rig floor.
-Hang Mud bucket sheave, Safety cable & Mud bucket.
-MU Mud manifold, Stand pipe & Cement line.
DECOMP Accept Rig ~ 03:00. Install double valve on Tbg spool.
-Install 1502 on Wing valve.
-Hook up lines to circulate out diesel freeze protection.
DECOMP RU & test DSM Lubricator. Test Lubricator to 500 psi -Pass.
-Pull BPV. RD Lubricator.
DECOMP Suck out cellar. MU IBOP & Torque clamp.
Pnntetl: 11/lU/'LUUN lU:"Lti:Lti AM
BP EXPLORATION Page 2 of 12
Operations Summary Report
Legal Well Name: 11-34
Common Well Name: 11-34 Spud Date: 10/30/1994
Event Name: WORKOVER Start: 10/13/2008 End:
Contractor Name: DOYON DRILLING INC. Rig Release: 10/26/2008
Rig Name: DOYON 14 Rig Number:
Date From - To ' Hours ~ Task Code NPT Phase Description of Operations
10/15/2008 07:00 - 08:30 1.50 WHSUR P DECOMP Steam outside lines. Test with air - OK
-Test hard line to 3500 psi -Pass.
-Pump 20 bbls of heated 9.3 ppg NaCI down Annulus up Tbg.
-Take returns to outside slop tank 126 gpm / 380 psi.
-Blow down lines. Swap hoses.
-Pump 40 bbls of 9.3 ppg NaCI down Tbg up Annulus.
-Take returns to outside slop tank 126 gpm / 280 psi.
08:30 - 09:00 0.50 WHSUR P DECOMP Blow down lines. Wait 30 minutes for diesel migration.
09:00 - 10:30 1.50 WHSUR P DECOMP Pump an additinal 10 bbls down Tbg up annulus to slop tank.
-126 gpm / 280 psi. Blow down lines.
-CBU 168 gpm / 560 psi.
10:30 - 11:00 0.50 WHSUR P DECOMP Blow down lines. RD hoses.
11:00 - 14:00 3.00 WHSUR P DECOMP FMC dry rod in TWC.
-Test TWC 1000 psi / 10 minutes from below -Pass.
-Test TWC 3500 psi / 10 minutes from above -Pass.
14:00 - 15:00 1.00 WHSUR P DECOMP Blow down lines. RD test equipment. Vac out Tree.
-Remove valves & pump in flange.
15:00 - 20:30 5.50 WHSUR P DECOMP ND Tree.
-Break connection on Tree / Adaptor flange.
-Confirm no VR plug in OA flow path.
-NSCT threads = 8.5 turns on Tbg hanger.
-Install Kelly hose. Put Spacer spool on Stack.
-Add extension to Choke line.
-Install Riser, Flow line, Fill up line & Bleed off line.
-Attach Turn buckles.
20:30 - 22:30 2.00 WHSUR P DECOMP C/O Lower Rams from 2 7/8" X 5" to 3 1/2" X 6".
-Swap for Doyon 16's needs.
22:30 - 00:00 1.50 WHSUR P DECOMP PJSM on testing BOP's.
-RU to test BOP's w/ 4" test Jt.
-RU test equipment.
10/16/2008 00:00 - 06:00 6.00 WHSUR P DECOMP BOPE Test:
-PJSM for testing BOPE's.
-Be in testin BOPE's.
---BOP Configuration:
-Hydril GK 13 5/8" 5000.
_~. -3 1/2" X 6" Variables.
-Blind Rams.
-Drilling Spool.
-3 1/2" X 6" Variables.
-Spacer spool C~3 18".
Test BOP and related equipment.
-Test per BP / AOGCC procedures and regulations.
-Test to 250 psi low - 3,500 psi high x 5 min each on chart.
-Test Top & Bottom Rams w/ 4" test joint and 4-1/2" test joint.
-All tests are a Pass.
Accumulator:
-Initial pressure = 2950 psi.
-28 seconds for 200 psi increase (1800 to 2000 psi).
-2 minutes 12 seconds for full pressure (2950 psi).
-Bottles 4 X 2200 psi.
-Test witness waived by Bob Noble AOGCC.
06:00 - 06:30 0.50 WHSUR P DECOMP RD test equipment. LD test Jt.
Blow down lines.
Pflnt2tl: 11/lU/LUUS 1U:2(i:"Lti AM
BP EXPLORATION Page 3 of 12
Operations Summary Report
Legal Well
Common W
Event Nam
Contractor
Rig Name:
Date Name: 1
ell Name: 1
e:
Name: D
D
From - To 1-34
1-34
WORKO
OYON
OYON
Hours
VER
DRILLIN
14
Task ~
INC
Code ~
.
NPT ~
Start
Rig
Rig N
Phase
Spud Date: 10/30/1994
: 10/13/2008 End:
Release: 10/26/2008
umber:
Description of Operations
10/16/2008 06:30 - 07:00 0.50 PULL P DECOMP Suck out BOP Stack.
-Install 6" Lubricator extension.
07:00 - 08:00 1.00 PULL P DECOMP PU DSM Lubricator. Test Lubricator to 500 psi / 5 minutes -
Pass.
-Pull TWC. RD Lubricator.
08:00 - 09:00 1.00 PULL P DECOMP LD Lubricator extension. Suck out BOP Stack.
-Hang Bales. PU 1 Jt of 4" DP. MU XO's.
09:00 - 10:00 1.00 PULL P DECOMP RIH screw into Tbg Hanger (8 1/2 turns).
-BOLDS. Break Tbg hanger free PUW = 160k.
-P II Tb han er to Ri floor PUW 155k;
10:00 - 11:30 1.50 PULL P DECOMP Pump: 40 bbls of Safe-Kleen pill. 40 bbls of Safe-Scav pill.
-Circ out Safe Kleen pill ~ 420 gpm / 680 psi.
11:30 - 12:00 0.50 PULL P DECOMP LD 1Jt of DP & XO's.
-LD Tbg hanger.
12:00 - 12:30 0.50 PULL P DECOMP Blow down Top Drive.
C/O Elevators.
12:30 - 20:30 8.00 PULL P DECOMP POH LD 4.5" 13CR-80, NSCT Tbg.
-LD 255 Jts + 1 cut Jt (~ 14.40' (flare = 5").
-LD 6 GLM's & 1 SSSV.
-Utilize Control line spooler. Recover 55 clamps.
20:30 - 22:00 1.50 PULL P DECOMP Clean Tbg handling equipment.
-LD cut Jt. C/O Elevators.
-Break Lubricator extension.
22:00 - 22:30 0.50 PULL P DECOMP Install Wear ring.
22:30 - 23:00 0.50 PULL P DECOMP MOB Dress off Tools to Rig floor.
PU: Dress off shoe, Wash pipe, Dress off Mill,
-7 5/8" Csg scraper, POS, LBS & Boot basket.
23:00 - 00:00 1.00 FISH P DECOMP MU Dress off assembly BHA.
10/17/2008 00:00 - 00:30 0.50 FISH P DECOMP Continue to MU Dress off BHA to 225' md:
-Dress Off Shoe, Wash pipe, Dress Off Mill, Boot basket,
-XO, 7 5/8" csg scraper, Bit sub, P.O.S., L.B.S., XO & 4 3/4"
D.C's.
00:30 - 01:00 0.50 FISH P DECOMP Service Rig: Lubricate Rig.
-Inspect Top Drive & Derrick.
01:00 - 08:00 7.00 FISH P DECOMP PU & Rabbit 4" DP 1 X 1 from 225' to 9,700' md.
08:00 - 09:30 1.50 FISH DECOMP PJSM. Cut- 1 1/4" drilling line (59.5').
-Removing extra wraps from raising Derrick.
-Service top Drive, Blocks & Rig.
09:30 - 10:00 0.50 FISH DECOMP Continue to PU and Rabbit 4" DP f/ 9,700' to 10,240' md.
-Work Csg scraper 4X across Pkr setting depth.
-Work pipe from 10,060' to 10,150' md.
10:00 - 11:00 1.00 FISH P DECOMP Screw in T.D. -Obtain parameters.
-PUW 200k -SOW 148k -ROW 168k w/ 5k torque.
-Break circ. w/ 252 gpm / 1140 ps.i
-Wash down and tag top of 4 1/2" tubing at 10,241'md.
-PU and rotate down w/ 40 rpm.
-Dress off outside of stub.
-Stop rotary and wash down to 10,258' and shoe depth w/ no
issues (swallow 17.5')
-Dress off top of stub w/ internal mill f/ 1/2 foot.
-PU and work over stub w/ no rotary.
11:00 - 12:30 1.50 FISH P DECOMP Pump H.V. sweep around while over stub.
-252 gpm / 1250 psi.
rnncea: i v wi~~uo i uzo:eo r+m
BP EXPLORATION Page 4 of 12
Operations Summary Report
Legal Well Name: 11-34
Common Well Name: 11-34 Spud Date: 10/30/1994
Event Name: WORKOVER Start: 10/13/2008 End:
Contractor Name: DOYON DRILLI NG INC. Rig Release: 10/26/2008
Rig Name: DOYON 14 Rig Number:
Date !~ From - To Hours Task ~, Code NPT Phase Description of Operations
10/17/2008 ~ 12:30 - 13:00 0.501 FISH ~ P DECOMP LD 2 Jts of 4" DP.
13:00 - 16:00 3.00 FISH P
16:00 - 16:30 0.50 FISH P
16:30 - 17:00 0.50 FISH P
17:00 - 21:00 4.00 FISH P
21:00 - 22:00 1.00 FISH P
22:00 - 00:00 2.00 FISH P
10/18/2008 00:00 - 01:00 1.00 FISH P
01:00 - 04:00 3.00 FISH P
04:00 - 06:00 2.00 FISH P
06:00 - 06:30 0.50 FISH P
06:30 - 08:30 2.00 FISH P
08:30 - 09:00 0.50 FISH P
09:00 - 09:30 0.501 FISH ~ P
09:30 - 10:30 1.00 FISH P
10:30 - 12:30 2.00 FISH P
12:30 - 14:00 1.50 FISH P
14:00 - 17:30 3.50 FISH P
17:30 - 18:30 1.00 FISH P
18:30 - 20:00 ~ 1.50 ~ FISH ~ P
20:00 - 00:00 I 4.001 FISH I P
-PU 15' + 5' pup Jts.
-PU 1 Jt of 4" DP to swallow Tbg stub.
-RU to reverse circulate.
DECOMP Reverse circulate 294 gpm / 1770 psi.
-Wait on SLB E-line.
DECOMP LD 1 Jt of 4" DP. LD 15' + 5' pup Jts.
-PU 1 JT of 4" DP.
DECOMP Monitor well -static.
-Top Drive up. Break circulation. Pump Dry job.
DECOMP POH w/ Dress off BHA on 4" DP.
-POH from 10,208' to the BHA ~ 225' md.
DECOMP Break down & LD Dress off BHA.
-Inside Mill showed good wear pattern.
DECOMP Clean & clear Rig floor of all tools not needed.
-MOB SLB E-line equipment.
DECOMP PJSM w/ SLB E-line.
-RU SLB Sheaves, Tools & line wiper.
DECOMP RIH w/ USIT Tools in cement & corrosion mode.
-RIH to 4,600' md, log up.
-TOC ~ 4,030' md.
DECOMP RD SLB E-line & Tools.
DECOMP MOB HES RBP & setting tool to Rig floor.
-MU RBP & setting tool on 4" DP to 14' md.
DECOMP RIH w/ RBP on 4' DP to 4,083' md.
DECOMP Set RBP; Verify set w/ 15k down & 5k overpull.
-RBP COE = 4,083' md. RBP TOE = 4,079' md.
-Rack back 1 Std.
DECOMP RU test equipment.
-Test 7 5/8" Cs to 1500 si / 10 minutes on chart -Pass.
-RD test equipment.
DECOMP Dum 34 sx of 20/40 sand on to of RBP.
DECOMP MU Top Drive.
-Pump 20 bbls of 9.3 ppg NaCI @ 63 gpm.
-Wait 1 hour for sand to settle.
-Service Rig, inspect Top Drive, Blocks & derrick.
-RIH tag sand 4,028' md.
DECOMP POH w/ RBP running tool from 4,028' to 14' md.
DECOMP MU 5 1/2" cutter for 7 5/8" Csg.
-RIH w/ cutter on 4" DP slowly to 3,898' md.
DECOMP Top Drive up. Obtain parameters:
-PUW 104k, SOW 100k, 1 k free Tq ~ 50 RPM.
-Break circulation ~ 63 gpm / 110 psi.
-Slack off to locate collar C~3 3,969' md.
-RU the cellar to take returns to outside tank.
DECOMP Cut 7 5/8" 29.7# Csg ~ 3,949' md.
- ump rate 210 gpm / 830 psi.
-Rotate (80 RPM) an additional 15 minutes to ensure cut.
-RU circulating head and cement line for hot diesel circulation.
DECOMP PJSM w/ LRS & CH2MHILL.
-Pump: 100 bbls of 120 degree diesel. 40 Hi Vis Sweep.
-40 bbls of Safe-Surf-O.
-Displace into soaking postion w/ 9.3 ppg NaCI.
Nnntea: nnuizuua IU:ZG:Zb HM
BP EXPLORATION Page 5 of 12
Operations Summary Report
Legal Well Name: 11-34
Common Well Name: 11-34 Spud Date: 10/30/1994
Event Name: WORKOVER Start: 10/13/2008 End:
Contractor Name: DOYON DRILLING INC. Rig Release: 10/26/2008
Rig Name: DOYON 14 Rig Number:
Date From - To Hours Task ,Code NPT .Phase Description of Operations
10/18/2008 20:00 - 00:00 4.00 FISH P DECOMP -Let soak 1 hour.
-Displace out diesel, Hi Vis Sweep & Safe-Surf-O pills.
-Pump 230 bbls of 9.3 ppg NaCI. 252 gpm / 1730 psi.
-FCP = 1660 psi.
10/19/2008 00:00 - 00:30 0.50 FISH P DECOMP Service Rig. Inspect Top Drive, Blocks & Derrick.
-Service Blocks & Drawworks. _ i~
-Blow down Choke manifold. ~/~~
00:30 - 02:00 1.50 FISH P DECOMP POH w/~D~Sf~Csg Cutter on 4" DP from 3,898' md.
-Casing was cut C~ 3,949' md.
02:00 - 02:30 0.50 FISH P DECOMP LD Csg cutter assembly.
02:30 - 03:00 0.50 FISH P DECOMP Pull Wear bushing.
-MOB Spear assembly to Rig floor.
03:00 - 03:30 0.50 FISH P DECOMP MU Spear assembly.
-PU single Jt of 4" DP, engage Fish.
03:30 - 05:00 1.50 FISH P DECOMP BOLDS.
-Lock downs extremely tight.
-Heat wellhead with steam. BOLDS.
05:00 - 05:30 0.50 FISH P DECOMP Pull Hanger free C~3 180k.
-PUW= 150k. Pull Hanger to floor.
05:30 - 07:30 2.00 FISH P DECOMP Circulate Two "Safe Surf O" pills surface to surface.
-Pump rate: 336 gpm / 140 psi.
07:30 - 08:30 1.00 FISH P DECOMP Release spear -Service break same.
-LD spear & single Jt of DP.
-Change elevators to Csg elevators.
-RU to pull 7 5/8" 29.7# casing.
08:30 - 13:30 5.00 FISH P DECOMP LD hanger.
-LD 7 5/8" 29.7# L-80 NSCC casing.
-Total Csg laid down = 95 csg Jts + 1 cut joint (12.60').
13:30 - 16:00 2.50 FISH P DECOMP LD cut Jt. Clear Rig floor of all tools not needed.
-Install Wear bushing. MOB BHA to floor.
-MU Dress off BHA:
-Dress off shoe, Wash pipe, Dress off Mill,
-Drive sub, XO's, 10 3/4" Csg scraper, Boot basket,
-Bit sub, XO, LBS, Oiljar, POS, XO & D.C's. to 323' md.
16:00 - 17:00 1.00 FISH P DECOMP RIH w/ Dress off BHA from 323' to 2,032' md.
-RIH on 4" DP.
17:00 - 17:30 0.50 FISH P DECOMP CBU @ 294 gpm / 430 psi.
-Ensure wellbore is clean of crude oil /diesel.
17:30 - 18:00 0.50 FISH P DECOMP RIH w/ Dress off BHA from 2,032' to 3,927' md.
-RIH on 4" DP.
18:00 - 18:30 0.50 FISH P DECOMP Obtain parameters: PUW 110k, SOW 105k, ROT wt 108k,
-Free Tq 1 k (~ 50 RPM.
-Ta ed 7 5/8" stub C~ 3 949' md. Dress off stub.
-WOB 10k, 210 gpm / 340 psi, 120 RPM ~ 3-5k Tq.
-Milled 6".
-Work pipe over stub -need 10 RPM to get over stub.
18:30 - 20:00 1.50 FISH P DECOMP Pump Hi Vis Sweep while over stub.
-Pump rate 210 gpm / 1200 psi.
20:00 - 21:30 1.50 FISH P DECOMP Monitor well -static. Blow down Top drive.
-POH from 3,927' to the BHA C~ 323' md.
21:30 - 22:30 1.00 FISH P DECOMP Rack back 3 stds of 4 3/4" D.C's.
-Service break Wash pipe extension.
rnncea: nnuizuuu IU:ZO:LO HM
BP EXPLORATION Page 6 of 12
Operations Summary Report
Legal Well Name: 11-34
Common Well Name: 11-34 Spud Date: 10/30/1994
Event Name: WORKOVER Start: 10/13/2008 End:
Contractor Name: DOYON DRILLING INC. Rig Release: 10/26/2008
Rig Name: DOYON 14 Rig Number:
Date From - To I, Hours Task Code NPT Phase Description of Operations
10/19/2008 21:30 - 22:30 1.00 FISH P DECOMP -LD: POS, Oil jar, XO, Bit sub, Boot basket, Csg scraper.
-LD: Double pin & XO.
22:30 - 00:00 1.50 FISH P DECOMP Clean & clear Rig floor.
-Pull Wear bushing. RU Csg double stack tongs.
10/20/2008 00:00 - 01:00 1.00 CASE P DECOMP Service Rig.
-Service & inspect Top Drive. Blocks & Derrick.
-Continue to RU Csg equipment.
01:00 - 07:30 6.50 CASE P DECOMP PJSM on running 7 5/8" Csg.
-Run 7 5/8", 29.7#, L-80 Vam Top HC Cs per Csg detail.
-All BTC connections below HES ES cementer Baker Lok'd.
-All BTC cnnections made up to triangle.
-Utilize "Jet Lube Seal Guard" on Vam Top connections.
-Vam Top HC optimum torque = 14,450 fUlbs.
-RIH to 3940'
07:30 - 08:30 1.00 CASE P DECOMP PU XO's
-Screw in T.D.
-Obtain parameters - PUW 152k -SOW 145k
-Rotate w/ 10 rpm -Engage 7 5/8" casing stub w/ Overshot /
Patch at 3949'
-Set down w/ 30k - PU w/ 15k over -Repeat process
-Pull test casin to 250k -Slack off to 100k over ull.
08:30 - 09:00 0.50 CASE P DECOMP RU and perform low pressure test to 1000 si f/ 10 min. on
hart - K
-Sta a pumps u to inflate ECP to 1200 si, 1400 si
-Pressure to 1700 psi and observe slight pressure drop
-Stogy oumos and allow element to fill and inflate ECP (lost 100
-Continue pressure up to 2000 psi to test casing for 10 min. on,
chart - OK
09:00 - 09:30 0.50 CASE P DECOMP Pressure to 3300 psi and open ES cementer.
-Circulate w/ 6 bpm, 100 psi until 85 degree returns achieved.
09:30 - 10:30 1.00 CASE P DECOMP Stop pumps
-RD XO's and break out Top Drive
-Change bales, Install BTC box X Vam Top HC XO
-Install HES cement head
-RU Schlumberger cement lines
10:30 - 11:00 0.50 CASE P DECOMP Break circulation w/ 4 bpm, 90 psi
-PJSM w/ rig crew and service personnel
11:00 - 12:00 1.00 CASE P DECOMP Give to Schlumberger:
-Fill lines to rig floor w/ H2O
-Test lines to 4500 psi
-Pump 180 bbls of 15.8 ppg class "G" cement w/ GasBlok
-0.2% D046 - 0.3% D065 - 0.4% D167 - 0.8% S001
-Drop HES closing plug -Kick out w/ 5 bbls H2O
12:00 - 13:00 1.00 CASE P DECOMP Turn over to Rig pumps
-Displace w/ 9.3 ppg brine
-8.4 bpm, 210 psi to catch cement
-Caught up w/ 67 bbls pumped
-140 bbls away, slow pumps to 2 bpm
-Divert fluid out "OA" valve to slop tank
-Cement to surface w/ 150 bbls awa
-Choke back w/ 300 qsi on annulus and squeeze cement into
Printed: 11/10/2008 10:26:26 AM
BP EXPLORATION Page 7 of 12
Operations Summary Report
Legal Well Name: 11-34
Common Well Name: 11-34 Spud Date: 10/30/1994
Event Name: WORKOVER Start: 10/13/2008 End:
Contractor Name: DOYON DRILLING INC. Rig Release: 10/26/2008
Rig Name: DOYON 14 Rig Number:
Date From - To ! Hours ~ Task Code NPT Phase Description of Operations
10/20/2008 12:00 - 13:00 1.00 CASE P DECOMP 10 3/4"x 20" annnulus
-Cement returns in cellar at 164 bbls away,
-Continue to sgeeze and take returns to slop tank
-Bump plug w/ 170.5 bbls away (1706 stks) -Observe ES
Cementer close w/ 2000 psi
-Bump plug w/ 3000 psi -Check floats - OK
-CIP at 12:30 hrs.
-Noted : 20 bbls of ood cement reurns to surface.
13:00 - 14:30 1.50 CASE P DECOMP Flush line to outside tank. Blow down same.
-Blow down Cmt line. RD Cmt head.
-Flush stack. Suck out stack and 7 5/8" Csg.
14:30 - 16:00 1.50 CASE P DECOMP PJSM on ND stack.
-Blow down hole fill line & Bleed off line.
-Remove flow line & Turn buckles. Drop riser.
-Remove Choke line. PU Stack.
16:00 - 18:00 2.00 CASE P DECOMP Set "E slips" w/ 100k overoull (250k PUV~D.
-Slack off to 150k PUW. Slips are set.
-PU additional 5k to cut Csg.
-Cut Csg w/ WACHS cutter per FMC rep.
18:00 - 00:00 6.00 CASE P DECOMP Nipple up BOP's. Install Choke line.
-PU 1 JT of 4" HWDP. MU running tool for Pack off.
-Install Pack off. Pack off would not test.
-Pull Pack off, replace 2 seals on Pack off.
-Run Pack off back in hole.
-Pack off would not test.
-Nipple down BOP's &Tbg spool.
Tbg spool scarred. Wait on new Tbg spool.
10/21/2008 00:00 - 01:00 1.00 WHSUR P DECOMP Recondition Csg spool void.
-Pack off would not test.
01:00 - 03:30 2.50 WHSUR P DECOMP Install Pack off & New Tbg spool.
-Test Pack off to 3800 psi per FMC rep.
-Having trouble getting a test.
-Due to scarring in Csg spool void.
-Tighten LDS. Test Pack off to 3800 psi / 30 minutes -Pass.
03:30 - 05:30 2.00 BOPSU P DECOMP NU BOPE
-Instal( Turn buckles, Choke line, Riser & Flow line.
-Nipple up.
05:30 - 06:30 1.00 BOPSU P DECOMP Test BOP Stack breaks.
-250 psi low - 3500 psi high
-5 min. each test - On chart
-RD test equip. -Blow down lines
06:30 - 07:00 0.50 WHSUR P DECOMP Install wear ring
07:00 - 08:30 1.50 CLEAN P DECOMP Mobilize BHA
-MU 6 3/4" bit, 2 boot baskets, 7 5/8" scraper, BS and jars
-RIH w/ 3 stands DC's
08:30 - 09:30 1.00 CLEAN P DECOMP RIH to 3824'
-Screw in T.D. -Obtain parameters
-PUW 110k -SOW 100k -ROW 105k w/ 60 rpm, 1-2k tq
09:30 - 10:30 1.00 CLEAN P DECOMP Wash down and tag cement stringers at 3848'
-Rotate down and tag solid cement at 3875'
-Drill cement and tag Closing plug / Es cementer at 3900'
10:30 - 13:30 3.00 CLEAN P DECOMP Control drilling rubber and ES Cementer w/ 3-5k WOB
F'rlntBO: 17 /1 U/LUUt3 1 U:LO:Gb HM
• o
BP EXPLORATION Page 8 of 12
Operations Summary Report
Legal Well Name: 11-34
Common Well Name: 11-34 Spud Date: 10/30/1994
.Event Name: WORKOVER Start: 10/13/2008 End:
,Contractor Name: DOYON DRILLING INC. Rig Release: 10/26/2008
Rig Name: DOYON 14 Rig Number:
Date From - To ', Hours Task Code NPT Phase Description of Operations
10/21/2008 110:30 - 13:30 3.001 CLEAN P
13:30 - 20:30 7.00 CLEAN P
20:30 - 21:30 I 1.00 CLEAN P
21:30 - 22:00 0.501 CLEAN P
22:00 - 00:00 I 2.001 CLEAN I P
10/22/2008 100:00 - 02:00 2.00 i CLEAN P
02:00 - 03:30 I 1.501 CLEAN I P
03:30 - 04:00 I 0.501 CLEAN I P
04:00 - 05:30 1.501 CLEAN P
05:30 - 06:00 0.50 CLEAN P
06:00 - 08:00 2.00 CLEAN P
08:00 - 08:30 0.501 CLEAN P
08:30 - 09:30 1.00 CLEAN P
09:30 - 11:00 i 1.501 CLEAN P
11:00 - 12:00 I 1.00 I CLEAN I P
12:00 - 12:30 I 0.501 CLEAN I P
DECOMP -Weight fell off
-Ream and backream through ES cementer several times
DECOMP Tag cement stringer at 3903'
-Pump H.V. sweep
-Drill hard cement f/ 3903' to 4009'. WOB 15k - 95 RPM / 2-3k
torque - 336 gpm / 980 psi.
-Clean f/ 4009' to 4023' with little to no WOB.
-Wash down f/ 4023' to 4033' w/ no rotation.
DECOMP CBU and observe sand returns.
-Turn pumps off and tap sand C~3 4030'. PU 15'.
-Pump hi-vis sweep and circulate surface-surface. 294 gpm /
790 psi.
DECOMP -Rack back one stand 4" DP.
-RU to test casing.
-Bleed air off from surface lines
-Close top rams.
DECOMP Testin casin to 3500 si on chart.
-Checking surface equipment, pressure dropping 200 psi in 30
min and not stabilizing.
DECOMP Cont testing casing to 3500 psi.
-Verify surface equipment OK and repeat test with top rams
closed. Pressure drops 200 psi in 30 min.
-Bleed off pressure. Open top rams and close bottom rams.
Repeat test obtaining same result. Pressure drops 200 psi in
30 min.
DECOMP -RD testing equipment
-POOH w/ cleanout BHA f/ 4013' to 315'.
DECOMP -Rack back DCs.
-LD 6-3/4" bit and boot baskets. Clean boot baskets:
aluminum pieces and brass pin pieces from ES Cementer.
DECOMP -RU testing equipment. Close blind rams.
-Test casing to 2000 psi x 30 min on chart. Test good.
-Test casino to 3500 psi. Observe pressure drops 200 psi i~
30 min.
-RD testing equipment.
DECOMP MU BHA w/ RCJB.
DECOMP RIH w/ RCJB to 4000'.
-Obtain parameters: PUW 110k /SOW 100k
DECOMP -MU top drive and break circulation w/ 168 gpm (~ 320 psi.
Shut down pumps.
-Tag top of sand ~ 4036'. Dry drill 1'.
-Bring up pumps to 336 gpm. Wash and rotate to 4054' (18').
PU 5'
DECOMP Pump hi-vis sweep and circulate surface-surface. 336 gpm ~
2060 psi.
DECOMP -Rack back 1 stand 4" DP.
-Blow down top drive.
-POOH f/ 4000' to 305' (BHA)
DECOMP -Rack back DCs
-LD and clean RCJB RCJB full of aluminum pieces from ES
DECOMP ~-Service drawworks, top drive and blocks.
rnntea: niiwzuuo w:co:co rwi
BP EXPLORATION Page 9 of 12
Operations Summary Report
Legal Well Name: 11-34
Common Well Name: 11-34 Spud Date: 10/30/1994
Event Name: WORKOVER Start: 10/13/2008 End:
Contractor Name: DOYON DRILLING INC. Rig Release: 10/26/2008
Rig Name: DOYON 14 Rig Number:
Date From - To Hours ' Task Code I~ NPT ~ Phase Description of Operations
~__ _ _ ,~.
10/22/2008 12:00 - 12:30 0.50 CLEAN P DECOMP -MU RCJB. RIH on 4-3/4" DCs.
12:30 - 13:30 1.00 CLEAN P DECOMP RIH w/ RCJB f/ 305' to 4003'.
13:30 - 14:00 0.50 CLEAN P DECOMP -MU top drive and obtain parameters: PUW 112k /SOW 105k
-Tap sand ~ 4055'. Wash and rotate down to 4064' (9').
14:00 - 15:00 1.00 CLEAN P DECOMP Pump hi-vis sweep and circulate surface-surface. 336 gpm ~
2060 psi.
15:00 - 16:00 1.00 CLEAN P DECOMP -Blow down top drive.
-POOH f/ 4064' to 305' (BHA).
16:00 - 17:00 1.00 CLEAN P DECOMP -Rack back DCs.
-Service break RCJB. LD jars, bumper sub, pump out sub and
RCJB.
-Mobilize RBP running tool to rig floor and MU same.
17:00 - 18:30 1.50 CLEAN P DECOMP RIH w/ RBP running tool on 4" DP to 3998'.
18:30 - 19:00 0.50 CLEAN P DECOMP -MU top drive and obtain parameters: PUW 105k /SOW 97k.
-Break circulation w/ 420 gpm ~ 1250 psi. Wash down to
4079' and latch RBP. Observe 100 psi increase in circulating
pressure when latching RBP.
-Retrieve RBP per HES rep.
19:00 - 20:00 1.00 CLEAN P DECOMP Pump hi-vis sweep and circulate surface-surface. 336 gpm ~
1030 psi.
20:00 - 21:30 1.50 CLEAN P DECOMP -Blow down top drive.
-Flow check well.
-POOH w/ RBP.
21:30 - 22:00 0.50 CLEAN P DECOMP -LD RBP and running tool.
-PU and MU 7-5/8" RTTS packer.
22:00 - 23:30 1.50 CLEAN P DECOMP RIH w/ RTTS on 4" DP and set same @ 4088' COE per HES
rep. (RTTS below casing patch-ES Cementer assvl.
23:30 - 00:00 0.50 CLEAN P DECOMP -RU to test casing above RTTS.
-Test casing above RTTS to 3500 psi on chart.
10/23/2008 00:00 - 01:30 1.50 CLEAN P DECOMP -Cont testing casing above RTTS to 3500 psi x 30 min.
Pressure drops 100 psi in 30 min.
-Test to 3000 psi x 30 min. Pressure drops 50 psi in 30 min.
-Test to 2500 psi x 30 min. Pressre drops 25 psi in 30 min.
01:30 - 02:00 0.50 CLEAN P DECOMP -Unseat RTTS and pull up 2 stands 4" DP. LD single.
-Set RTTS ~ 3865' (COE) per HES rep (RTTS above casing
atch - ES Cementer assy).
02:00 - 03:00 1.00 CLEAN P DECOMP Test casing above RTTS to 3500 psi x 30 min. Pressure drops
100 psi in 30 min. Test replicates results obtained on test
made before w/ RTTS below casin atch.
03:00 - 03:30 0.50 CLEAN P DECOMP Wait on FMC rep. to test packoff.
03:30 - 04:30 1.00 CLEAN P DECOMP FMC rep attempt to test packff to 3800 psi. Packoff does not
test.
04:30 - 10:00 5.50 CLEAN P DECOMP -FMC rep fills void in packoff with plastic packing
-Energize plastic packing and test packoff to 3800 psi x 30 min.
Left 4300 psi on plastic packing per FMC procedures (500 psi
to energize + 3800 psi test pressure)
-PU single + 2 stands 4" DP and set RTTS ~ 4088' (COE ;
RTTS below casin atch - ES Cementer ass
10:00 - 10:30 0.50 CLEAN P DECOMP -Test casing above RTTS to 3500 psi x 30 min on chart. Test
good.
-Blow down kill line
-Unseat RTTS.
10:30 - 12:00 1.50 CLEAN P DECOMP POOH w/ RTTS f/ 4088' to surface.
Printed: 11/10/2008 10:26:26 AM
•
BP EXPLORATION Page 10 of 12
Operations Summary Report
Legal Well Name: 11-34
Common Well Name: 11-34 Spud Date: 10/30/1994
Event Name: WORKOVER Start: 10/13/2008 End:
Contractor Name: DOYON DRILLING INC. Rig Release: 10/26/2008
Rig Name: DOYON 14 Rig Number:
Qate From - To 'Hours Task Code NPT Phase !, Description of Operations
10/23/2008 12:00 - 12:30 0.50 CLEAN P DECOMP -Service break RTTS and LD same.
-Pull wear bushing.
12:30 - 13:30 1.00 BOPSU P DECOMP RU to test BOP.
13:30 - 19:00 5.50 BOPSU P DECOMP Test BOP and related equipment per BP / AOGCC procedures
and regulations. Test to 250 psi low - 3500 psi high x 5 min
each on chart. Test annular preventer to 250 psi low - 3500 psi
high x 5 min each on chart. Test components w/ 4" test jt.
Test top rams and bottom rams w/ 4" and 4-1 /2" test jts. Test
witnessed by WSL, Toolpusher and AOGCC Rep (John Crisp).
-Perform koomey test:
1. System Pressure: 3000 psi
2. Pressure after close: 1700 psi
3. 200 psi attained at 32 sec
4. Full pressure attained at 2 min 43 sec
5. Nitrogen bottles: 4 x 2200 psi avg.
-Tested 29 components:
1.13-5/8" annular
-~' 2. 3-1/2" x 6" VBR (upper rams)
3. Blind rams
4. 3-1/2" x 6" VBR (lower rams)
5. HCR valves (kill and choke)
6. Manual valves on kill line and choke line
7. Choke manifold valves (14)
8. Manual choke and hydraulic choke
9. Inside BOP, FOSV (ball type), Upper and Lower kelly valves
(upper and lower top drive IBOP)
19:00 - 19:30 0.50 BOPSU P DECOMP -RD testing equipment.
-Install wear bushing
19:30 - 20:00 0.50 FISH P DECOMP Service top drive and blocks.
20:00 - 21:00 1.00 FISH P DECOMP -Mobilize tools for next BHA to rig floor
-RU stack tongs to MU 2-7/8" PAC DP.
21:00 - 22:30 1.50 FISH P DECOMP MU BHA w/ Cut Lip Guide Shoe + 5-3/4" Washpipe extensions
+ 2-13/16" Itco Spear + Shear Pin Guide Assy + 3 jts 2-7/8
PAC DP + Pump out sub + bumper sub +jars + 3 stands
4-3/4" DCs.
22:30 - 00:00 1.50 FISH P DECOMP RIH w/ BHA f/ 404' to 4674' (to fish junk catcher in tubing
stum
10/24/2008 00:00 - 02:00 2.00 FISH P DECOMP Cont. RIH f/ 4674' to 10170'.
-PUW 210k /SOW 140k
02:00 - 03:30 1.50 FISH P DECOMP -Tap top of tubing stump ~ 10241'
-Swallow tubing stump in washpipe extensions to shear guide.
Shear pins with 19k.
-Enter tubing stump with spear and 2-7/8" PAC DP to 10263'
-MU top drive and break circulation w/ 84 gpm ~ 480 psi
-Cont. down and taq funk catcher ~ 10304'. Push down to
10316' and engage spear in junk catcher. Observe pressure
increase to 560 psi.
-PU 30k over string weight and set down 20k. Repeat 3 times.
03:30 - 04:00 0.50 FISH P DECOMP -Pull 'unk catcher until same above tubin stum .
-Drop dart and pump it down to open pump out sub. 210 gpm
~ 1550 psi while pumping dart down. 210 gpm ~ 690 psi
after pump out sub open.
04:00 - 05:30 1.50 FISH P DECOMP -Pump hi-vis sweep as spacer
rnntea: nnuizuua lU2b:Zb HM
•
BP EXPLORATION Page 11 of 12
Operations Summary Report
Legal Well Name: 11-34
Common Well Name: 11-34
Event Name: WORKOVER
Contractor Name: DOYON DRILLING INC.
Rig Name: DOYON 14
Date From -To ~ Hours'~~ Task Code NPT
Spud Date: 10/30/1994
Start: 10/13/2008 End:
Rig Release: 10/26/2008
Rig Number:
Phase Description of Operations
10/24/2008 04:00 - 05:30 1.50 FISH P
05:30 - 06:00 0.50 FISH P
06:00 - 12:00 6.00 FISH P
12:00 - 13:00 1.00 FISH P
13:00 - 14:00 1.00 FISH P
14:00 - 14:30 0.50 FISH P
14:30 - 16:30 2.001 FISH ~ P
16:30 - 18:00 1.50 RU
18:00 - 00:00 6.00 RU
10/25/2008 ~ 00:00 - 06:30 ~ 6.50
06:30 - 07:30 I 1.00
07:30 - 08:30 I 1.00
08:30 - 09:00 I 0.50
DECOMP -Displace well w/ 8.5 ppg seawater. 378 gpm ~ 1870 psi.
DECOMP -Blow down top drive
-Clean surface equipment in pits
DECOMP POOH and LD 4" DP 1x1 to pipe shed f/ 10170' to 1850'
DECOMP -Cont. POOH and LD 4" DP 1x1 to pipe shed f/ 1850' to 405'
(BHA)
-RIH 3 stands 4" DP remaining in derrick.
-Finish POOH and LD 4" DP 1x1 to pipe shed.
DECOMP POOH and LD 9 4-3/4" DCs 1 xi to pipe shed.
DECOMP -Lubricate rig.
-Inspect top drive
DECOMP -Finish LD BHA. Recover junk catcher.
-Clear rig floor.
RUNCMP RU to run completion: C/O elevators and bales; install
compensator, power tongs and torque turn equipment.
RUNCMP -MU tail pipe w/ 7-5/8" x 4-1/2" Unique Overshot assy + 4-1/2"
X nipple assy (w/ RHC-M plug) + 1 jt 4-1/2" 12.6# 13Cr80 Vam
Top tubing + 7-5/8" x 4-1 /2" S-3 Packer assy + 4-1 /2" X nipple
assy. Bakerlok all connections below packer. Torque turn
connections to 4440 ft-Ib.
-Cont. RIH 4-1/2" 12.6# 13Cr80 Vam Top tubing and
completion equipment to 4000'. Torque turn connections to
4440 ft-Ib.
RUNCMP Cont. running 4-1/2" 12.6# 13Cr80 Vam Top tubing and
completion equipment f/ 4000' to 10226'.
-Check PUW 175k /SOW 125k (blocks weight 50k)
RUNCMP -MU XOs, head pin and cement line. Break circulation w/ 126
gpm C~3 120 psi.
-Wash down and tag tubing stub. Swallow tubing stub in
overshot. Observe pressure increase to 200 psi. Observe pins
shear w/ 12k and bottom out over shot.
RUNCMP -RD cement line and XOs
-LD jts #239 and 238. Determine space out.
RUNCMP -MU 2.07' 4-1/2" 12.6# 13Cr80 Vam Top pup jt and 29.71'
12.6# 13Cr80 Vam Top jt on top of jt #237. MU tubing hanger
and landing joint.
-Total 4-1/2" 12.6# 13Cr80 Vam Top R3 tubing jts run: 237.
09:00 - 09:30 0.50 BUNCO RUNCMP RU to reverse circulate.
09:30 - 11:00 1.50 BUNCO RUNCMP Reverse circulate seawater w/ corrosion inhibitor. 126 gpm C«~
540 psi.
11:00 - 11:30 0.50 BUNCO RUNCMP -Drop ball-and-rod to set packer.,
-RU testing equipment.
11:30 - 13:00 1.50 BUNCO RUNCMP -Pressure up tubing to 3500 psi and set packer. Hold 3500 ps
-Bleed pressure in tubing to 1500 psi.
-Pressure u IA to 3500 psi, while holding 1500 psi in tubing.
Hold 3500 si in IA x 30 min. Chart test. Test ood.
-Bleed off pressure in tubing and observe DCK-2 valve shear.
Cont. bleeding off all pressures.
-Pump down IA, with returns out tubing. 80 gpm ~ 820 psi.
-Pump down tubing, with returns out IA. 90 gpm ~ 920 psi.
13:00 - 15:00 2.00 WHSUR P RUNCMP -LD landing joint.
t'nntea: nnuizuua iu:zo:zoHnn
C,
r~
BP EXPLORATION Page 12 of 12
Operations Summary Report
Legal Well Name: 11-34
Common Well Name: 11-34 Spud Date: 10/30/1994
Event Name: WORKOVER Start: 10/13/2008 End:
Contractor Name: DOYON DRILLING INC. Rig Release: 10/26/2008
Rig Name: DOYON 14 Rig Number:
Date From - To Hours Task I Code. NPT Phase Description of Operations
10/25/2008 13:00 - 15:00 2.00 WHSUR P RUNCMP -FMC rep. dry rod TWC.
-Test TWC f/ below to 1000 psi x 10 min on chart. Test f/
above to 3500 six 10 min on chart.
15:00 - 18:30 3.50 BOPSU P RUNCMP -Blow down lines and vac out stack.
-C/O bottom rams to 2-7/8" x 5" VBR (in preparation f/ next
well .
-ND BOP and set back.
-Barriers in wel to ND BOP: packer set and tested in IA, tubing
tested w/ ball-and-rod in X nipple, tubing hanger tested, TWC
installed and tested.
18:30 - 22:00 3.50 WHSUR P RUNCMP -NU tree and adapter flange.
-Test adapter flange void to 5000 psi x 30 min per FMC rep.
-Test tree w/diesel to 5000 psi x 10 min on chart.
22:00 - 23:30 1.50 WHSUR P RUNCMP -RU DSM lubricator. Test same to 500 psi x 5 min on chart.
-Pull TWC.
-RD lubricator
23:30 - 00:00 0.50 WHSUR P RUNCMP RU Little Red Services. Test lines to 3000 psi.
10/26/2008 00:00 - 02:00 2.00 WHSUR P RUNCMP -Little Red pump 85 bbls diesel down IA, taking returns out
tubing, for freeze protect.
-1 BPM ~ 375 psi ICP / 550 psi FCP.
02:00 - 03:30 1.50 WHSUR P RUNCMP Jump IA to tubing. Let diesel U-tube.
03:30 - 04:00 0.50 WHSUR P RUNCMP -Mobilize and install DSM lubricator.
-Test lubricator to 500 psi x 5 min on chart.
04:00 - 05:00 1.00 WHSUR P RUNCMP -Install BPV. RD lubricator.
-Test BPV f/ below w/ Little Red (using diesel) to 1000 psi x 10
min on c art.
-Bleed down pressure and suck back lines. RD Little Red.
05:00 - 06:00 1.00 WHSUR P RUNCMP -Install blank flange on wing valve.
-Remove secondary valve in IA.
-Install gauges in IA, OA and tree cap. Secure cellar.
Ri released ~ 06:00
OA = 0 psi / IA = 0 psi / TBG = 0 psi.
Yflnt2tl: 11/lU/'LUUtf IU:Lb:Lb HM
c~
11-34, Well History (Post Rig Workover)
Date Summary
10/28/2008 T/I/0=0/0/0. Pull 4" CIW H BPV. Post Doyon 14.
10/30/2008 WELL S/I ON ARRIVAL. CURRENTLY RUNNING IN W/ 2" JDC PULLING TOOL TO PULL B&R.
10/31/2008 PULLED BALL & ROD FROM 10,217' SLM. PULLED STA.#4 (1" BK-DCK) FROM 3,810' SLM. MADE
MULTIPLE ATTEMPTS TO PULL STA# 3 DGLV C«~ 6374' W/ NO SUCCESS. TAGGED STA.# 3 C~ 6374'
SLM W/ 4-1/2" OK-6, 1-1/4" LIB (IMPRESSION INCONCLUSIVE). TAGGED RHC W/ 3.5" LIB Q 10222'
SLM (IMPRESSION OF BK LATCH). CURRENTLY RUNNING IN W/ 3.6" & 2.6" BELLGUIDES W/ 1 1/4"
JDC.
11/1/2008 FISHED STA.#2 (1" BK-DGLV) FROM RHC ~ 10,222' SLM. SET GENERIC GASLIFT DESIGN IN
STA.'S # 4 & 3. PULLED 4-1/2" RHC FROM 10,223' SLM. MADE MULTIPLE BAILER RUNS TO PX
PLUG AT 10,323' SLM RECOVERED APPROXIMATELY 5.5 GALLONS/SLUGGETS.
11/3/2008 RAN 3" PUMP BAILER TO 10,323' SLM (RECOVERED 1/2 GALLON SLUGGITS). PULLED P-PRONG
FROM TTP Q 10,323' SLM. CURRENTLY RUNNING 3.5" PUMP BAILER TO TO CLEAR SLUGGITS
OFF 4 1/2" PX PLUG BODY C«3 10,332' SLM.
11/4/2008 MADE MULTIPLE BAILER RUNS TO 10,336' SLM (NO RECOVERY). MADE MULTIPLE ATTEMPTS
TO PULL 4-1/2" PX PLUG BODY FROM 10,336' SLM (ONLY GETTING FRICTION BITES).
CURRENTLY RE-RUNNING 2.25" PUMP BAILER.
11/5/2008 RAN 3.5" LIB & 2.5" LIB TO 10,335' SLM, FINE SAND LIKE MARKS & INCONCLUSIVE MARKS ON
BOTH. MADE 2- ATTEMPTS W/ 2.25" STAR BIT TO PLUG BODY Q 10,334' SLM. IN HOLE W/ 10'x 2
.25" PUMP BAILER TO PLUG BODY Q 10334' SLM.
11/6/2008 RAN ASSORTMENT TOOLS (SEE LOG) IN AN ATTEMPT TO CLEAR DEBRIS FROM 4 1/2" PX PLUG
BODY @ 10330' SLM W/ NO SUCCESS.
NOTE: PAD OPERATOR TO PUT WELL ON PRODUCTION TO CLEAR UP DEBRIS
4 1/2" PX PLUG BODY STILL IN HOLE.
WELL S/I ON DEPARTURE. DSO NOTIFIED OF ALL VALVE POSITIONS.
11/13/2008 WELL FLOWING ON ARRIVAL. UNABLE TO GET PAST 3,754' SLM W/ 4-1/2" GR (ice on gr).
CLEANED UPTIGHT SPOTS FROM 2,121' TO 3,808' SLM W/ 3.805" G-RING. INSTRUCTED BY REP
TO POOH & INSTALL S-BLR (suspect hydrates ~ st #1 3832' md) . CURRENTLY RIH W/ 2.80" CENT,
S-BLR.
11/14/2008 TAGGED HYDRATE BRIDGE C~ 2,562' SLM W/ 2.80" CENT, S-BLR (blr full of hydrates). WELL S/I ON
DEPARTURE, NOTIFIED DSO OF WELL STATUS.
NOTE: 4-1/2" PX PLUG BODY IS STILL IN HOLE C~ 10,336' MD.
11/15/2008 T/I/0=1100/1500/0 Temp=S/I Thaw TBG, Hydrates. Pumped 6 bbls of neat methanol into the flowline to
verify flow path. Pumped 12 bbls of neat methanol into the Tbg. Tbg pressured up to 2500 psi. Bled Tbg
pressure to the flowline. Pumped back into the Tbg with 23 bbls of neat methanol followed by 76 bbls of
190° crude. Freeze protected the flowline with 6 bbls of neat methanol. Final WHP's = 200/1220/50
Valve positions at the time of departure : Swab, Wing, AL =Closed / SSV, Master, =Open / IA & OA
are open to the gauges.
11/16/2008 WELL S/I ON ARRIVAL. ATTEMPT TO FISH 4 1/2"PX PLUG BODY FROM 8297' MD. WELL LEFT S/I
ON DEPARTURE, DSO NOTIFIED.
11/20/2008 WELL S/I ON ARRIVAL. PULLED 4-1/2" PX PLUG BODY FROM ST# 2 GLM ~ 8,278' SLM. DRIFT W/
2.78" CENT & S-BAILER, STOP C~ 10,560' SLM DUE TO DEV (73 DEGREES). EMPTY S-BAILER. ELL
S/I ON DEPARTURE.
Page 1 of 1
rn ~ I RCC nvrv - arc ~~,euiv
~.~~
:B. ELEV = 64'
.F. ELEV =
:OP = 1257'
Sax Angle = 95 @ 11491'
Datum MD = 14971'
latum TV D - 8800' SS
SAFETY NOTES: FHLITIW HBBP PKRS HAVETEST
--~--
~
~ -34 PR LIMITS IN SOM E CASES. CONTACT ACE
(X CHEOTBG CSG 8< LNR 10500'
5/8" SCAB CSG, 29.7#, L-80 VAM TOP, ID = 6.785"
2094' -14-112" X NIPPLE, ID = 3.813"
3952' Cement to surface ®~
GAS LIFT MANDRELS
10-3/4" CSG, 45.5#, NT-80 BTC, ID = 9.953" 11 4052' ~-
Minimum ID = 3.813" @ 10336'
4-1 /2" X NIPPLE
7-5/8" CSG, 29.7#, NT-95HS XO TO 13CR-80 9679'
4-1/2" TBG, 12.6#, 13CR-80 I-L 1
VAM TOP .0152 bpf, ID = 3.958"
DUMP SLUGGfTS (09/20/08) I-j 10326'
4-1/2" TBG, 12.6#, 13CR-80 NSCT, + 10348'
.0152 bpf, ID = 3.958"
TOP OF 4-1/2" LNR
7-5/8" CSG, 29.7#, 13CR-80 XO TO NT-95HS ~ 11198'
4-1/2" SOLID LNR, 12.6#, 13CR-80 11216'
NSCT, .0152 bpf, ID = 3.958"
4-1/2" PORTED LNR, 12.6#, 11255'
13-CR-80, .0152 bpf, ID = 3.958"
7-5/8" CSG, 29.7#, NT-95HS, 1D = 6.875" 11282'
PERFORATION SUMMARY
REF LOG:
ANGLE AT TOP PERF: 78° @ 10940'
Note: Refer to Production DB for historical pert data
SIZE SPF INTERVAL Opn/Sqz DATE
3-3/8" 4 10940 - 10966 C 03/31 /98
3-3/8" 4 10994 - 11019 C 03/31/98
3-3/8" 4 11019-11044 C 03/31/98
3-3/8" 4 11070 - 11090 C 02/14/98
4-1/2" 32 11255 - 12797 SLTD 11/27/94
iT TJID lVD DEV TYPE VLV LATCH PC7FZi DAT1
4 3832 3514 38 KBG2 DOME BK 16 11/01/
3 6381 5505 39 KBG2 SO BK 20 11/01/
2 8297 6994 37 KBG2 DMY BK 0 10/25/
1 9538 7987 35 KBG2 DMY BK 0 10/25/
10150' 4-1/2" X NIPPLE, ID = 3.813"
10172' 7-5/8" X 4-1/2" BAKER S-3 PKR,
10225' 4-1/2" X NIPPLE, ID = 3.813"
10251' 7-5/8" X 4-1/2" UNIQUE OVERSHOT
10275' 7-5/8" X 4-112" TMJ HBBP
PKR W/POSRNE LATCH, ID = 3.955"
10336' 4-1/2" OTIS X NIP, ID = 3.813"
10336' 4-1/2" PX PLUG (2/1/08)
10348' 4-1/2" WLEG, ID = 3.958"
10342' ELMD TT NOT LOGGED
11162' 4' TNV SS HIGH ANGLE PKRI HGR, ID = 4.00"
11213' I~ 4-1 /2" OTIS X NIP, ID = 3.813"
1216' I~ 4-1 /2" PORTED PUP JOINT, ID = 3.958"
I I
I I
I I
I
I\ ` MILLOUT WINDOW (11-34) 11553'
\ ~
~ ~ ~ 12$27' 4-1/2" X-LOCK WfT'H FLOW THRU SUB
\ ~
4-1/2" SLTD LNR, 12.6#, 13CR-80, NSCT, .0152 bpf, ID = 3.958"
I 12797' I
I 12832' I
14-1/2" LNR, 12.6#, 13CR-80, NSCT, .0152 bpf, ID = 3.958" I
I 12820' I
DATE REV BY COMMENTS DATE REV BY COMMENTS
11/27/94 N28E ORIGINAL COMPLETION 11/10/08 JCM/SV GLV C/O (11/01/08)
02/02/08 BSE/SV PATCH PULLED (01/22/08)
02/02/08 BSE/SV PX PLUG SET (02/01/08)
02/07/08 PJC DRAWING CORRECTIONS
10/26/08 D14 RWO
1 1(1/31/(1RI /TI H I(~]RRR:TI(]NR II I I
PRUDHOE BAY UNIT
WELL: X11-34
PERMfT No: 1941380
API No: 50-029-22516-00
SEC 33, T11 N, R15E, 449' FNL & 40' FEL
RP Fynlnraf•inn l~laskal
12/18/08
Schl~rmherger
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Wwll -Inh ft
N0.5011
Company: State of Alaska
;,,`u ~ ~;~ ; ~ ~11 ~~. ~~ ~~3~,~ Alaska Oil & Gas Cons Comm
- y ~ Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
11-34
12071901 -- -
USIT [.~ _
10/17/08 o~ wwr
1 vv
1
V-219 12103700 USIT _ 11/21/08 1 1
D-12 12113022 INJECTION PROFILE '~j 12/05/08 1 1
R-11A 12096929 USIT 12/07/08 1 1
01-34 12116292 CORRELATION/GR LOG (p - ! '~- ~ a 12/06/08 1 1
F-19 AWJI-00011 MEM LDL 12/08/08 1 1
18-29B AWJI-00010 MEM LDL (, ~ 12/05/08 1 1
09-41 12017504 PRODUCTION PROFILE 1g -'C3 12/04/08 1 1
18-14B 12005233 MCNL -- 09/21/08 1 1
18-06B 12083417 MCNL 10/28!08 1 1
18-14C 12066551 MCNL ~ 10/06/08 1 1
05-10C 11649990 MCNL 10/04/08 1 1
V-219 12103700 CH EDIT (USIT) 11/21/08 1
_
L ~
°~ ~ VVl T -t
~ - ~ C
PI GACP ACIlIJA\Arl Crl~_C oo re~nr ov c.~nu uu+ wu.. e~.~t..............._ ,.,..,., _-_.. __
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Date Delivered:
•
•
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2 8
ATTN: Beth
Received by: ~~-~--------
ALASSA OIL AND GAS
CONSERVA~`ION COl-II-II5SION
•
SARAH PALlN, GOVERNOR
333 W. 7th AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
David Reem
Engineering Team Leader
BP Exploration Alaska Inc. -~
PO Box 196612 '" ~~~ ~ ~ 211D~
Anchorage, AK 99519-6612 , ~ ~
.~~q~'
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 11-34
Sundry Number: 308-321
Dear Mr. Reem:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided iri AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day ft the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
Cathy P. Foerster
Commissioner
DATED this ~ day of September, 2008
Encl.
STATE OF ALASKA '~
ALASKA~L AND GAS CONSERVATION COMMISSI
APPLICATION FOR SUNDRY APPROVAL
20 AAC 25.280 ~~
~ ~ (~ ~ ~i ;
1. Type of Request: ^ Abandon ^ Suspend ^ Operation Shutdown ^ Perforate ^ Time Extens~o aS ~CI"i6.
® Alter Casing . ®Repair Well ~ ^ Plug Perforations ^ Stimulate ^ Re-EMer Suspend~~l~+ ~~
^ Change Approved Program ®Pull Tubing ~ ^ Perforate New Pool ^ Waiver ^ Other
2. Operator Name:
BP Exploration (Alaska) Ina 4. Current Well Class:
. ® Development ^ Exploratory 5. Permit To Drill Number
194-138
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 ^ Service ^ Stratigraphic 6. API Number:
50-029-22516-00-00
7. If perforating, closest approach in pool(s) opened by this operation to nearest
property line where ownership or landownership changes:
Spacing Exception Required? ^ Yes ®No 8. Well Name and Number:
PBU 11-34
9. Property Designation:
ADL 028326 ~ 10. KB Elevation (ft):
63.8'- 11. Field /Pool(s):
Prudhoe Bay Field / Prudhoe Bay Pool
12. PRESENT WELL CONDITION SUM MARY
Total Depth MD (ft):
12832' Total Depth TVD (ft):
8789' - Effective Depth MD (ft):
12820' Effective Depth TVD (ft):
8789' Plugs (measured):
10336' Junk (measured):
12827'
i i TV
I
7' 1 - / " 7' 2
Perforation Depth MD (ft):
Below Pluq: 10940' -12797' Perforation Depth TVD (ft):
8760' - 8788' Tubing Size:
4-1/2", 12.6# Tubing Grade:
13Cr80 Tubing MD (ft):
10348'
Packers and SSSV Type: 7-5/8" x 4-1/2" TIW'HBBP' packer Packers and SSSV MD (ft): 10275'
13. Attachments:
® Description Summary of Proposal ^ BOP Sketch
^ Detailed Operations Pro ram 14. Well Class after proposed work:
^ Exploratory ®Development ^ Service
15. Estimated Date for
Commencin O erations: September 13, 2008 16. Well Status after proposed work:
®Oil , ^ Gas ^ Plugged ^ Abandoned
17. Verbal Approval: Date:
Commission Re resentative: ^ WAG ^ GINJ ^ WINJ ^ WDSPL
18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Mackie Derrick, 564-5891
Printed Name vid Reem Title Engineering Team Leader
Preparetl By NamelNWnber:
Signature Phone 564-5743 Date ~ ~ Terrie Hubble 564-4628
Commission Use Onl
Sundry Number:
Conditions of approval: Notify Commission so that a representative may witness
^ Plug Integrity ~ BOP Test ^ Mechanical Integrity Test ^ Location Clearance
Other. '~~, @S ~ ~~~ ~S~
Subsequent Form Required: ~[ ®~
APPROVED BY ~ ~O Q
A roved 6 : COMMISSIONER THE COMMISSION Date 7/
Form 10-403 Revised Of~2006
Submit In Duplicate.
o
~~'
~U~ t-tti:Sf01?
ORIGINAL
•
by
cr,~,~
11-34 Expense Rig Workover
Scope of Work: Repair Surface Casing Leak: Pull 4-%2" L-80 completion, cut and pull 7-%8" casing, run
and cement to surface 7 5/8" casing, run 4-~h" 13Cr-80 "stacker-packer" completion.
MAASP: 2404 psi
Well Type: Producer
Estimated Start Date: September 13th , 2008
Production Engineer: Bob Chiwis
Intervention Engineer: Mackie Derrick
Pre-Rfg Work Reauest:
F 1 CMIT-TxIA to 3500 si, LLR if fails
S 2 Tag PX Plug ~ 10336' MD. Dump 10' of sluggits on PX Plug. Set 4-'h" junk catcher on
slu its.
E 3 Power Jet cut 4-'h" 13Cr-80 tubing at 10,240' MD, in the middle of the first full joint above the
TIW acker. Reference tubin tall dated 11/25/1994.
F 4 Circulate well with kill wei ht fluid and diesel thru the cut.
W 5 Check the tubing hanger lock down screws for free movement. Completely back out and check
each lock down screw for breaka a check one at a time . PPPOT-T & IC.
W 6 Set a BPV in the tubin han er.
O 7 Remove the wellhouse & flow line. Level the ad as needed for the ri .
Proposed Procedure
1. MIRU. ND tree. NU BOPE with 3-'h" x 6" VBR pipe rams. Pressure test to 3500 psi. Circulate out
freeze protection fluid and circulate well to clean seawater through the cut.
2. Pull and LD 4-th" tubing string to the cut.
3. Run USIT log to determine top of cement in 7 5/8" x 10-3/4" annulus.
4. Set retrievable bridge plug 100' below the top of cement and pressure test to 1500 psi for 15 minutes.
5. Cut and pull 7 5/e" casing from above the top of cement. Note: Pipe rams will not be changed to 7-
5/e" as the well has two tested barriers (PX plug and RBP) to the reservoir.
6. Run and fully cement new 7 5/8" casing to surface. Squeeze cement thru surface casing leak
7. Drill out 7 5/e' shoetrack
8. Pressure Test 7 5/8" casing to 3500 psi
9. Pull retrievable bridge plug
10. Pull junk catcher, LDDP
11. Run 4-~/z" 13Cr-80 stacker packer completion with Baker S-3 packer. Position packer at --10200' MD.
12. Displace the IA to packer fluid and set the packer.
13. Test tubing and IA to 3500 psi. Freeze protect to 2200' MD.
14. Set BPV. ND BOPE. NU and test tree. RDMO.
TREE = FMC
WELLHEAQ = CNV
ACTUATOR = BKR C
KB.,ELEV = 64'
BF. ELEV =
KOP = 1257'
Max Angle = 95 @ 11491'
Datum MD = 14971'
Datum TV D = ~ 8800' SS
110-3/4" CSG, 45.5#, NT-80 BTC, ID = 9.953" I
7-5/8" CSG, 29.7#, NT-95HS XO TO 13CR-80 I--1 9679'
Minimum ID = 3.813" @ 10336'
4-1 /2" X NIPPLE
4-1/2" TBG, 12.6#, 13CR-80 NSCT, I~ 1
.0152 bpf, ID = 3.958"
TOP OF 4-1/2" LNR
7-5/8" CSG, 29.7#, 13CR-80 XO TO NT-95HS ~ 11198'
4-1/2" SOLID LNR, 12.6#, 13CR-80 11216'
NSCT, .0152 bpf, ID = 3.958"
4-112" PORTED LNR 12.6#, 11255'
13-CR-80, .0152 bpf, ID = 3.958"
7-5/8" CSG, 29.7#, NT-95HS, ID = 6.875" - 1
PERFORATION SUMMARY
REF LOG:
ANGLEATTOPPERF: 78° @ 10940'
Note: Refer to Production DB for historical pert data
SIZE SPF INTERVAL Opn/Sqz DATE
3-3/8" 4 10940 - 10966 C 03/31/98
3-3/8" 4 10994 - 11019 C 03/31/98
3-3/8" 4 11019 - 11044 C 03/31/98
3-3/8" 4 11070-11090 C 02/14/98
4-1/2" 32 11255-12797 SLTD 11/27/94
2111' ~4-1/2"CAMTRCF-4A SSSV NIP,
TRSV LOCKED OPEN, ID = 3.812"
GAS LIFT MA NDREIS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
1 4941 4383 39 A-KBMG DMY BK 0 08/14/04
2 7129 6081 39 A-KBMG DMY BK 0 11/25/94
3 7901 6681 38 A-KBMG DMY BK 0 08/14/04
4 8514 7168 36 A-KBMG DMY BK 0 11/25/94
5 9163 7686 37 A-KBMG DMY BK 0 11/25/94
6 9777 8183 35 A-KBMG DMY BK 0 08/14/04
11 027x' 1~7-5/8" X 4-1/2" TIW HBBP
PKR W/POSffIV E LATCH, ID = 3.955"
10336' 4-1/2" OTIS X NIP, ID = 3.813"
10336' 4-1l2" PX PLUG (2/1/08)
10348' 4-1/2" WLEG, ID = 3.958"
10342' ELMD TT NOT LOGGED
14' TMJ SS HIGH ANGLE PKR/ HGR, ID = 4.00" (
4-1/2" OTIS X NIP,ID = 3.813"
11216' I-i4-1/2" PORTED PUP JOINT, ID = 3.958"
I I
I I
I
I\ \ MILLOUT WINDOW (11-34) 11553'
\ ~
~ \ 12827' 4-1/2" X-LOCK WffH FLOW THRU SUB
~ \
\ ~
\ ~
\ ~
4-112" SLTD LNR, 12.6#, 13CR-80, NSCT, .0152 bpf, ID = 3.958"
I 12797' I
14-1/2" LNR, 12.6#, 13CR-80, NSCT, .0152 bpf, ID = 3.958" I
I 12820' I
DATE REV BY COMMENTS DATE REV BY COMMENTS
11/27/94 N28E ORIGINAL COMPLETION
02/02/08 BSE/SV PATCH PULLED (01/22/08)
02/02/08 BSE/SV PX PLUG SET (02/01/08)
02/07/08 PJC DRAWING CORRECTIONS
I 12832' I
PRUDHOE BAY UNff
WELL: X11-34
PERMfT No: 1941380
API No: 50-029-22516-00
SEC 33, T11 N, R15E, 449' FNL & 40' FEL
BP Exploration (Alaska)
SAFETY NOTES: FHL/TIW HBBP PKRS HAVETEST
11 ~~ ~ (x51 OR OPT 5700° @ 05050' """CHROM EE TBG,
CSG 8~ LNR"'"'
TREE = FMC
WELLHEAD = CM/
ACTUATOR = BKR C
KB. ~LEV = 64'
BF. ELEV =
KOP = 1257'
Max Angle = 95 @ 11491'
Datum MD = 14971'
Datum TV D = 8800' SS
~ 10-314" CSG, 45.5#, NT-80 BTC, ID = 9.953" ~
2100' 14-1/2" X NIPPLE, ID = 3.813"
Cernent to surface
GAS LIFT MANDRELS
ST MD TVD DEV TYPE VLV LATCH PORT DATE
1 3815 3500
2 6375 5500
3 8305 7000
4 9555 8000
7-5/8" CSG, 29.7#, NT-95HS XO TO 13CR-80 9679' 10180' 4-1/2" X NIPPLE, ID = 3.813"
10200' 7-518" X 4-1/2" BAKER S-3 PKR,
Minimum ID = 3.813" @ 10336' 10220' a-1/2" X NIPPLE, ID = 3.813"
4-1 /2" X NIPPLE
"
"
UNIQUE OVERSHOT
X 4-1/2
10240' 7-5/8
4-1/2" TBG, 12.6#, 13CR-80 10240'
10275' 7-5/8" X 4-1/2" TNV HBBP
VAM TOP .0152 bpf, ID = 3.958" PKR W/POSfT'NE LATCH, ID = 3.955"
4-1/2" TBG, 12.6#, 13CR-80 NSCT, 10$4$' 10336' 4-1/2" OTIS X NIP, ID = 3.813"
.0152 bpf, ID = 3.958" 10$4$' 4-1/2" WLEG, ID = 3.958"
10342' ELMD TT NOT LOGGED
TOP OF 4-1 /2" LNR ~--~ 11162'
~ 7-5/8" CSG, 29.7#, 13CR-80 XO TO NT-95HS ~
4-1/2" SOLID LNR 12.6#, 13CR-80
NSCT, .0152 bpf, ID = 3.958"
4-1/2" PORTED LNR 12.6#,
13-CR-80, .0152 bpf, ID = 3.958"
7-5/8" CSG, 29.7#, NT-95HS, ID = 6.875"
PERFORATION SUMMARY
REF LOG:
ANGLE AT TOP PERF: 78° @ 10940'
Note: Refer to Production DB for historical pert data
SIZE SPF INTERVAL Opn/Sqz DATE
3-3/8" 4 10940 - 10966 C 03/31/98
3-3/8" 4 10994 - 11019 C 03/31/98
3-3/8" 4 11019 - 11044 C 03/31 /98
3-3/8" 4 11070 - 11090 C 02/14/98
4-1/2" 32 11255 - 12797 SLTD 11/27/94
~ 4' TMJ SS HIGH A NGLE PKR/ HGR, ID = 4.00" ~
4-1/2" OTIS X NIP, ID = 3.813"
71-11t)~ 1~4-1/1" KJFiItUF'UF'JUINI, IU=:i.y58"
I ~
~ ~
~ ~
I\ \ MILLOUT WINDOW (11-34) 11553'
\ ~
\ ~
~ \ 12827' 4-1/2" X-LOCK WffFi FLOW THRU SUB
\ ~
\ ~
\ ~
\ ~
\ ~
4-1/2" SLTD LNR, 12.6#, 13CR-80, NSCT, .0152 bpf, ID = 3.958" I
~ 4-1/2" LNR, 12.6#, 13CR-80, NSCT, .0152 bpf, ID = 3.958" ~
DATE REV BY COMMEMS DATE REV BY COMMENTS
11/27/94 N28E ORIGINAL COMPLETION
02/02/08 BSE/SV PATCH PULLED (01/22/08)
02/02/08 BSE/SV PX PLUG SET (02/01/08)
02/07/08 PJC DRAWING CORRECTIONS
PRUDHOE BAY UNfr
WELL: X11-34
PERMfT No: 1941380
API No: 50-029-22516-00
SEC 33, T11 N, R15E, 449' FNL & 40' FEL
BP Exploration (Alaska)
~ 11 34 SAFETY NOTES: FHL/TIW HBBP PKR,S HAVETEST
~ P LIMITS IN SOMECASES. CONTACT ACE
(x51 OR TO PT. 70° @ 10500' "'CHROM E TBG,
Proposed RWO CSG 8 LNR""
Scblumbergep
RECE1VED
06/05-06/06
·iI IN I)' R ?nng
-4 - v L\.ìt..;l.;
NO. 3835
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400 ,'1"":: Î'! g r> J~~"" '~~rr'Jnìssícn
Anchorage, AK 99503-2838 ". ""..."\.. v' '';¡ "'~ ",1..1,,,,, 1..,,,
ATTN: Beth Anchçrag-e
~
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage. AK 99501 -:3%
Field: Prudhoe Bay ~ '\ ~ ~
',',
W
CD
BL
CI
ell Job# Log Description Date oor
17-13A f-lt:=;- - -, ".:J(\ 11001218 US IT 04/04/05 1
NK-65A AIJ,"Ç -('")r:~~ 11084270 SCMT 07/05/05 1
02010B :IN. '\- C' &, '--I 10964140 LDL 04/06/05 1
01-11 /'-'" -:t - (")<-'+ 11051039 INJECTION PROFILE Œ;. ;::¡., - r ¿Jr- ,;, . '~'J 0, h111/ó<. 04/29/05 1
01-09A ¡q</ - n~~ 10559825 INJECTION PROFILE , 07/31/03 1
01-11 !-::¡.-:¡ -,-...," ,--:¡- 10662950 INJECTIO~ PROFILE QDP~I - (""Q.e\Ù~ ::> 1¡)3/0-'" 09/16/03 1
i..{- I,~<í<; 10687720 LDL 12/31/04 1
A-07 Î ~~ - 04.11 9153241 PRODUCTION'PROFILE (t. c, I - r.;C'...' ,~)-¡}{:'l., 02/04/03 1
B-36 I q 1,'1 - ()0K' 10563182 LDL (\ ,.. ,'\, - o",r· "':JerJ ÎJ.::1~f^~' 07/09/03 1
01:20 115;:), - Ji-h__ 10687694 PRODUCTION PROFILE - 07/16/04 1
K-01 1"7r-.~ - / i~ I 11211415 SCMT 06/01/06 1
H-30 I "7\'?( - i"~"~ 11217253 USIT 06/01/06 1
D.S:09-06 1''1(~ - t'-.¿¡~ 11258699 US IT 04/13/06 1
Petrotechnical Data Center LR2-1
900 E, Benson Blvd, ,
Anchorage. Alaska 99508 ,\ ': t'
0.1);,,-
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
e
e
11-34 (PTD #1941380) Classified as Problem Well
~,l. 'btz4\Ø
All,
Well 11-34 (PTD #1941380) has been found to have sustained casing pressure on the
IA. The TIO's on 08/01/04 were 2400/2400/0.
The plan forward for this well is as follows:
1. DHD: TIFL - FAILED
2. SL: DGLVs
3. DHD: Re-TIFL
A wellbore schematic has been included for reference.
«11-34.pdf»
The well has been classified as a Problem well. Please
questions.
Thank you,
Anna Dube
Well Integrity Coordinator
GPB Wells Group
Phone: (907) 659-5102
Pager: (907) 659-5100 x1154
call if you have any
Content-Description: 11-34.pdf
Content-Type: application/octet-stream
Content-Encoding: base64
freS5wes Receø- p~
4-~ J-tJYf u~,t D1'"í5> ~) b/r<;;. ~) wl'¡¿ ~£L~
--rúb¡~, 'ZAð~'
7/~ 2-1 2С 414 Cfo3¡ lac¡ 40 5""ßz-
I
J{+ ZAol:f:.: ""3{,b~r:>: 01'- 6/W:>4 2J6 17/1 7'1
71" 45"z- 4(,415
,
DA c z.. 345' r: o\t-- '? 12004 ~ 22,727 'l~b,olo
S?¡ Z4S'
4-1"Ub4 30 Zfo, ß42- '161 ~ 9'jW¡
I ,
I of 1
8/24/200410:19 AM
TREE =
FIVC
WB.LHEAD = CPN
A CTl.Lð. TOR = BKRC
KB. ELEV = 64'
BF. ELEV =
KOP= 1257'
Max Anal:! = 95 @ 11491'
DatumMD= 11401'
DatumTVD = 8800' SS
11-34
.
10-314" CSG, 45.5#, NT-80, ID= 9.953"
17-518" CSG, 29.7#, NT-95 HS, ID= 6.875" H
'TOP OF 7-5/8" CSG H
9679'
9679'
Minimum ID = 3.812" @2111'
4-112" SSSV NIPPLE
4-1/2"TBG,12.6#, 13-CR-80, 0.0152 bpf,lD =3.958"
TOPOF 4-1/2" Ufl
17-518" CSG, 29.7#, 13-CR-80, ID= 6.875" H
TOP OF 7 -5/!!' CSG
4-112" LNR, 12.6#, 13-CR-60, 0.0152 bpf, ID = 3.958"
I TOP OF 4-112" LNR - PORTED H
4-1/2" R)RTED LNR, 12.6#,
13-CR-80, 0.0152 bpf, ID = 3.958"
TOP OF 4-112" SL 10 LNR
I
I
I
I
I
I
I
I
I
I
~~
:..----
7-518" CSG, 29.7#, NT-95 HS, ID= 6.875"
4-1/2" LNR-SL TD, 12.6#,
13-CR-60, 0.0152 bpf, ID = 3.958"
¡TOP OF 4-112" LNR H
12797'
ÆRFORA lION SLtv'lMARY
REF LOG:
ANGLE AT 1OPPERF: 78 @ 10940'
Nate: Refer to Production DB for historical perf data
SIZE SA" INTffiVAL Opn/Sqz DATE
3-318" 4 10940-10966 0 03/31/98
3-318" 4 10994-11019 0 03/31/98
3-318" 4 11019-11044 0 03/31/98
3-318" 4 11070-11090 0 02/14/98
4-1/2" 32 11255-12797 SL1O 11127/94
14-112" LNR, 12.6#, 13-CR-80, 0.0152 bpf, ID = 3.95!!' I
2111'
ST MD TVD
1 4941 4363
2 7129 6081
3 7901 6681
4 8514 7168
5 9163 7686
6 9777 8163
10275'
10336'
SAFETY NOTES: FH../TIW HEmP PKRS HAVE
TEST PRESSURELIMITS INSOME CASES.
CONTACT ACE(x5102) PRIOR TO PRESSlRE
TESTING. CHROMETBG,CSG, LNR. 7rJ'@
10500' AtÐ goo@ 11329'
4-1/2"CAMTRCF-4A SSSV NIP,
TRSV LOCKED OPEN, ID = 3.812"
GAS UFTMAtÐRELS
DEV TYPE VLV LATCH
39 A-KBMG BK-2
39 A-KBMG BK-2
38 A-KBMG BK-2
36 A-KBMG BK-2
37 A-KBMG BK-2
35 A-KBMG BK-2
R)RT ~ TE
7-518" X 4-1/2" TaN HBBP
PKR W/POSfTlVELATCH
4-1/2" OTIS X NIP, ID = 3.813"
10348' 4-1/2" TUBING TAIL 1/VLB3
H ELMD TT NOTLOGGED I
11162'
11213'
~TE RBI BY COMMENTS DATE REV BY COMMENrS
11/25/94 ORIGINAL COMA..EllON
01/16/01 SIS-MH CONVERTED TO CANV AS
02120/01 SIS-MD FINAL
01/03102 RNITP CORREClIONS
I MLLOUTWINDOW: 11553'
6" ?TIW SS HGHAt-X3LEHGRlA<R
4-1/2"OTISXNIP,ID=3.813"
4-1/2" X-LOCK VlllTH FLOWTI-RU SUB
PRUDHOE BAY UNIT
\NELL: 11-34
PffiMT/'ob: 194-1380
API /'ob: 50-029-22516-00
SEC 33, T11N, R15E, 1311.09 FEL 1704.67 FNL
BP Exploration (Alaska)
ON OR BEFORE
W
c:LOp, ikMI~M-DOC
STATE OF ALASKA
_.-,,SKA OIL AND GAS CONSERVATION COMMIS~,,.,
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation Shutdown_ Stimulate__ Plugging_ Perforate _X
Pull tubing _ Alter casing _ Repair well _ Other _
2. Name of Operator: 5. Type of Well: 6. Datum of elavation (DF or KB feet):
ARCO Alaska, Inc. Development _~ 64' RKB
3. Address: Exploratory_ 7. Unit or Property:
P.O. Box 100360 Stratagrapic_
Anchorage, AK 99510-0360 Service_ Prudhoe Bay Unit
4. Location of well at surface: 8. Well number:
4381' NSL, 40' WEL, Sec 33, T11N, R15E, UM 11-34
At top of productive interval: 9. Permit number/approval number:
2769' SNL, 161' WEL, Sec 29, T11N, R15E, UM 94-138
At effective depth: 10. APl number:
50-029-22516
At total depth: 11. Field/Pool:
1704' SNL, 1319' FWL, Sec 29, T11N, R15E, UM Prudhoe Bay Oil Pool
12. Present welt condition summary
Total Depth: measured 12832 feet Plugs (measured)
true vertical 8789 feet
Effective Depth: measured 12797 feet Junk (measured)
true vertical 8788 feet
Casing Length Size Cemented Measured depth True vedlcal depth
Conductor 75' 20" 260 Sx Arcticset 110' 110'
Surface 4017' 10-3/4" 1345 Sx CS III & 375 4052' 3687'
Sx Class G & 303 Sx CS II
Production 11251' 7-5/8" 915 Sx Class G 11282' 8808'
Liner 1658' 4-1/2" Uncemen ted 12820' 8789'
Perforation Depth measured 10940'-10966'; 10994'-11044'; 11070'-11090'
(Slotted Liner: 11255'- 12797')
true vertical 8760' - 8765'; 8771' - 8781", 8886'- 8790'
(Slotted Liner: $806'-8788') " .......
Tubing (size, grade, and measured depth) 4-1/2" 12.6#, 13CR-80, NSCT Tbg @ 10348' MD. /t~l~S~;a. 0il & f~as Cons. Corn, l¥1Jssiort
/ir~chorage
Packers and SSSV (type and measured depth) TIW HBBP Packer @ 10275' MD; 4-1/2" Camco TRCF-4A SSA SSSV @ 2111' MD.
13. Stimulation or cement squeeze summary
Intervals treated (measured) -.
14. Representitive Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation 1859 34513 1139 1195
Subsequent to operation 2867 34843 1418 1118
15. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run _
Daily Repeal of Well Operations _)~ Oil _X Gas _ Suspended _ Service _
17. I hereby certily that the foregoing is true and correct to the best of my knowledge.
Signed ~,~~ ..~ ~ Title: Engirleering Supervisor Date "~.. ~.~ _ ~ ~/
Erin Oba ' Prepa[ed by Paul Rauf 263-4990
Form 10-404 Rev 06/15/88
SUBMIT IN DUPLICATE
11-34
PERFORATING OPERATIONS
DESCRIPTION OF WORK COMPLETED
2/13/98 - 2/14/98:
MIRU CTU & PT BOP stack to 4000 psi. RIH w/perforating guns & shot 20' of Add per[orations @'
11070' - 11090' MD (Z1B) Ref. Log: BHC Sonic 11/14/94.
Shot 4 SPF. POOH w/perf gun. Noted guns fired. RD.
3/31/98:
MIRU CTU & PT equipment to 3500 psi. RIH w/perforating guns & shot 75' of Add perforations @:
10940' - 10966' MD (Z1 B)
10994' - 11044' MD (Z1 B)
Used a 3-3/8" carriers and shot 4 SPF. POOH w/perf gun. Noted guns fired. RD.
Returned the well to production & obtained a valid well test.
6eeiog~¥cal Ha'ter'-i~als tnven"hor'y
P [{ R H ii T D A 1' A T .[.) A T,-'~ ...... F' L U S
94.---'i38 6334 1,~9800--.i 'f795 OH/FINALS
9/, .-- i .38
9 ~-'-138
94 ..~ i 38
~1~:9~00-'~ilO96o ..
9a '--! 38
A r" e d r' y d 'i' ir. c h
samp'les r'equi'r"ed? yes ~Ld r'-ecei'ved'.:"
Was hhe we'i'i eot'ed? yes
&. d e s ,:: r' 'i' p t :i' o n r"~ d '"~
v e d '/ '~-'
Ar'e v./e'i'i tests r'equi'r'ed? yes
Wei'l ~s ~'in compi'i'ance __~¢J-o
I in 'i' t 'i' a 'i
C 0 ki kl E N T S
m Ftl I__/I IM G S I::: I::t ~./I C I::: S
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Howard Okland
3001 Porcupine Dr.
Anchorage, Alaska 99501
RE: MWD Formation Evaluation Logs - DS 11-34 AK-MW-40089
July 12, 1996
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a
signed copy of this transmittal letter to the attention of.'
Tan Galvin, Sperry-Stm Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
1 LDWG formatted magnetic tape with LIS listing.
JUL 1 5 1996
5631 'Silverado Way, Suite G · Anchorage, 'Alaska 99518 · (9¢7) 563-3256 · Fax (907) 563-7252
A Dresser Industries, Inc. Company
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMP LETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
ARCO Alaska, Inc. ,,,. 94-138
3. Address / .i~/ 8. APINumber
P. O. Box 196612, Anchora~te, Alaska 99519-6612 / ~,4~- 0,2_9-22516
4. Location of well at surface ~. ,.~ 'i'; .:~:i :~-~: 9~"/J,~it/o~_L~a/s,~ Name
4831'NSL, 40'WEL, SEC. 33, T11N, R15Eir ' : i'.~ " ~ ~r~cll~-¢ ~a/Unit
:;~4SI[: 10. Well NurfltCer
At Top Producing Interval
~...,~,?¢.. . 11. Field and Pool
At Total Depth
Prudhoe
Bay
Field/Prudhoe
Bay
Pool
1704'SNL, 1319' WEL, SEC. 29, T11N, R15E
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No.
KBE = 63.8' I ADL 28326
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions
10/30/94 11/23/94 11/26/94 I N/A feet MSLI One
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD)19. Directional Survey J20. Depth where SSSV set J21. Thickness of Permafrost
12832' MD/8789' TVD 12797' MD/8788' TVD YES [] NO [] I 2111' feet MD I 1900' (Approx.)
22. Type Electric or Other Logs Run
CHT/-I'EMP/GR/CNL/AC/DIFL
23. CASING, LINER AND CEMENTING RECORD
SE'I-RNG DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BO-FI'OM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.5# H-40 35' 110' 30" 260 sx Arcticset (Approx.)
10-3/4" 45. 5# NT-80 35' 4052' 13-1/2" 1345 sx CS 111/375 sx "G'/303 sx CS II
7-5/8" 29.7# NT95/13CR 31' 11282' 9-7/8" 915 sx Class "G"
4-1/2" 12. 6# 13CR 11162' 12820' 6-3/4" Uncemented slotted liner
24. Perforations open to Production (MD+TVD of Top and Bottom and ;)5. TUBING RECORD
interval, size and number) SIZE DEPTH SETIMD) PACKER SET (MD)
Slotted Liner 11255L 12797' MD 4-1/2", 13CR80 10348' 10275'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
1/12/95 Flowing
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESlZE IGAS-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips.
Form 10-407 '? Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
30.
GEOLOGIC MARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Subsea
Shublik 9921' 8235'
Top Sadlerochit 10016' 8306'
Base Sadlerochit 11265' 8744'
31. LIST OF A-I-rACHMENTS
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed /¢~f v( ~ TitleDdllingEngineerS(~pervisor Date JLt¢/~
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
BP/AAI SHARED SERVICE
DAILY OPERATIONS
PAGE: 1
WELL: DS 11-34
BOROUGH: NORTH SLOPE
UNIT: PRUDHOE BAY
FIELD: PRUDHOE BAY
LEASE:
API: 50-
PERMIT:
APPROVAL:
ACCEPT: 10/30/94 04:00
SPUD:
RELEASE:
OPERATION:
DRLG RIG: NABORS 28E
WO/C RIG:
10/30/94 ( 1)
TD: 0'( 0)
10/31/94 (2)
TD: 1305' (1305)
11/01/94 ( 3)
TD: 2322' (1017)
11/02/94 ( 4)
TD: 4068' (1746)
ACCEPING RIG MW: 0.0 VIS: 0
MOVE RIG. NIPPLE UP DIVERTER. RIGGED UP SURFACE LINES.
NIPPLE UP RISER AND FLOW LINES. TAKE WATER IN MUD PITS FOR
SPUD MUD. WORK COMPLETED - SURFACE LINES IN POSITION.
MUD MOTOR FAILED MW: 0.0 VIS: 0
NIPPLE UP DIVERTER. TEST WELL CONTROL EQUIPMENT. TESTED
DIVERTER. FUNCTION TEST COMPLETED SATISFACTORILY. MADE UP
BHA #1. CHANGED OUT STABILIZER SLEEVES. ORIENT AND FLOW
TEST. DRILLED TO 390' LINER FAILED, CIRCULATE. REPAIRED
LINER. CORK COMPLETED, LINER CHANGED OUT. DRILLED TO
1305'. MUD MOTOR FAILED, END BHA RUN. DUMP VALVE ON MUD
MOTOR APPEARS TO HAVE FAILED.
DRILLING MW: 0.0 VIS: 0
CIRCULATED AT 1305'. OBTAINED BOTTOMS UP. PULLED OUT OF
HOLE. CHANGE OUT MOTOR AND ORIENT. RIH TO 1305' DRILLED
TO 2205' ROP DROPPED FROM 160 FT/HR TO 40.0 FT/HR. BBIT
QUIT. UNABLE TO SLIDE. CIRCULATED AT 2205' OBTAINED
BOTTOMS UP. POH TO 660'. PULLED BHA. BHA STOOD BACK.
CHANGED BIT. BIT 1/2" UNDER GAUGE. MADE UP BHA #3. RIH
TO 2135'. BEGAN PRECAUTIONARY MEASURES. REAMED TO 2205'.
DRILLED TO 2245'. PRESSURE CHANGE FROM 2300.0 PSI TO
1850.0 PSI IN .50 HR. DOWNHOLE WASHOUT. PULLED OUT OF
HOLE TO 660' REPAIRED VARIABLE BLADE STABILIZER. CHECKED
MUD MOTOR. FOUND WASHOUT UNDER SLEEVE ON STABILIZER.
ORIENT BHA. RIH TO 2245' BHA RUN #4. DRILLED TO 2322'
POH TO 800' MW: 0.0 VIS: 0
DRILLED TO 3529'. STARTED SCHEDULED WIPER TRIP, DUE TO
FOOTAGE DRILLED. PULLED OUT OF HOLE TO 1995' TIGHT HOLE
@ 3425 & 2217' WORKED CLEAN. RIH TO 3529'. NO PROBLEMS
HOLE CLEAN. DRILLED TO 4068' REACHED PLANNED END OF RUN
- SECTION / WELL T.D. CIRCULATED AT 4068'. OBTAINED
BOTTOMS UP. PULLED OUT OF HOLE TO 800'. TRIP TO HWDP.
STRAP OUT. 2' DEEPER. NO PROBLEMS ENCOUNTERED. RIH TO
4068'. CIRCULATED AT 4068' OBTAINED CLEAN RETURNS. POH
TO 800'.
WELL · DS 11-34
OPERATION:
RIG : NABORS 28E
PAGE: 2
11/03/94 (5)
TD: 4068' ( 0)
11/04/94 ( 6)
TD: 6220' (2152)
11/05/94 ( 7)
TD: 7395' (1175)
11/06/94 ( 8)
TD: 8715' (1320)
11/07/94 ( 9)
TD: 9960' (1245)
RIH TO 3972' MW: 0.0 VIS: 0
BHA LAID OUT. RIGGED UP CASING HANDLING EQUIPMENT. RAN 99
JTS 10 3/4", 45.5~, NT-80 CSG AND FLT EQ. FS @ 4052'. FC
@ 3972' RAN CSG TO BOTTOM WITH NO HOLE PROBLEMS.
RECIPROCATE CSG WHILE CIRC B/U. PUMPED 5 BBLS H20 AND
TESTED LINES. PMP 70 BBLS H20. MIXED AND PUMPED 1345 SX
(459 BBLS) COLDSET III LEAD CMT + 375 SX (77 BBLS) CLASS G
TAIL CMT. DISPLACED CMT W/ 5 BBL H20 + 377 BBLS MUD.
BUMPED PLUG WITH CALC'D STROKES. RECIPROCATED W/ FULL
RETURNS THROUGHOUT JOB. NO CMT RETURNS @ SURFACE. PMP 37
BBLS H20 AND 61 BBLS CMT @ 14.7 PPG. GOOD CMT RETURNS.
RUN CSG, 10 3/4" O.D. RIGGED DOWN CASING HANDLING
EQUIPMENT. RIGGED DOWN DIVERTOR. INSTALLED 13 5/8" SPLIT
UNIHEAD. RIGGED UP BOP STACK. TESTED BOP STACK. TESTED
PIPE RAMS, BLIND RAMS, CHOKE AND KILL LINE VALVES. HCR
VALVES, CHOKE AND FLOOR SAFETY VALVES. TESTED ANNULAR
PREVENTOR. FUNCTION TESTED ACCUMULATOR. MADE UP BHA #5.
SERVICED BLOCK LINE. LINE SLIPPED AND CUT. RIH TO 3972' @
FC.
DRILLING MW: 0.0 VIS: 0
TESTED CASING, VIA ANNULUS. DRILLED CEMENT TO 4078'
DRILLED FLOAT COLLAR EQUIPMENT, CMT, 10' NEW HOLE.
PERFORMED LEAKOFF TEST. DRILLED TO 5337' STARTED
SCHEDULED WIPER TRIP; DUE TO FOOTAGE DRILLED. CIRCULATED
AT 5337' OBTAINED BOTTOMS UP. POH TO 4052'. RIH TO 10
3/4" CASING SHOE. RIH TO 5337'. TIGHT HOLE @ 4630 -
4530' DRILLED TO 6220'.
DRILLING MW: 0.0 VIS: 0
DRILLED TO 6769' ROP DROPPED FROM 120.0 FT/HR TO 90.0
FT/HR. BIT QUIT. CIRCULATED. OBTAINED CLEAN RETURNS.
POH TO 220' BHA STOOD BACK. L/D MUD MOTOR AND SERVICED
MWD. INSTALLED WEAR BUSHING. MADE UP BHA #6. P/U DUAL
STAGE MUD MOTOR AND DS59H BIT. ORIENT. RIH TO 6769'
DRILLED TO 7395'.
DRILLING MW: 0.0 VIS: 0
DRILLED TO 8080'. ROTARY TABLE FAILED, CIRCULATE.
REPAIRED ROTARY TABLE. CIRC SWEEP AROUND WHILE TROUBLE
SHOOT AND REPAIR ROTARY TABLE ELECTRIC MOTOR BRUSHES. POH
TO 5200'. MADE SCHEDULED WIPER TRIP WHILE FINISH RIG
REPAIRS. RIH TO 8080'. NO HOLE PROBLEMS. DRILLED TO
8715'
POH MW: 0.0 VIS: 0
DRILLED TO 9960' REACHED PLANNED END OF RUN. DIRECTIONAL
OBJECTIVE MET. CIRCULATED @ 9960'. HOLE SWEPT WITH SLUG.
POH TO 4500' NO HOLE PROBLEMS.
WELL : DS 11-34
OPERATION:
RIG : NABORS 28E
PAGE: 3
11/08/94 (10)
TD: 9960' ( 0)
11/09/94 (11)
TD:10320'( 360)
11/10/94 (12)
TD:10388'( 68)
ll/ll/94 (i3)
TD:10511' ( 123)
RIH TO 8000' MW: 0.0 VIS: 0
M/U AND ORIENT MUD MOTOR AND MWD/GR BHA. MUD MOTOR 1.75
DEC BENT HOUSING. SERVICED WEAR BUSHING. RIH TO 3700'.
SERVICED BLOCK LINE. LINE SLIPPED AND CUT. RIH TO 4116'
TOOK SEVERAL SURVEYS, BUT WOULD NOT MATCH BENCH MARK
SURVEYS PREVIOUSLY TAKEN. RIH TO 4213' TOOK TWO SURVEYS
THAT WERE WITHIN ACCEPTABLE RANGE AS PER SPERRY SUN. NO
HOLE PROBLEMS. PRECUATIONARY REAM TO BOTTOM. ATTEMPED TO
TAKE BENCHMARK SURVEY @ TD. COULD NOT. OBTAINED WEAK
SURVEYS, 5 DEC OFF AZMITH. DECISION MADE TO CHANGEOUT MWD
SENSOR. CIRC WHILE WAIT ON MAGNETIC MULTISHOT SURVEY
INSTRUMENT. DROPPED MULTISHOT SO COULD COULD HAVE BACKUP
OF BENCHMARK SURVEYS. RETRIEVED ESS TOOL. CHANGED OUT MWD
PROBE. PICKED UP MONEL DC AND L/D LEAD DC AS PRECAUTION.
REPLACED LEAKING 0 RING SEAL. BENCHMARK SURVEY WITH NEW
MWD PROBE, MATCHED PREVIOUS SURVEYS AND ESS MULTISHOT. RIH
TO 8000'
DRILLING MW: 0.0 VIS: 0
RIH TO 9960' NO HOLE PROBLEMS. FINISHED WITH MWD
REPAIRS. DRILLED TO 10277' HAD CHANGE IN TORQUE FROM
20000 FT/LD TO 25000 FT/LB. BIT QUIT. CIRCULATED.
OBTAINED BOTTOMS UP. POH. PERFORMED BENCHMARK SURVEY @
4308', OK. MADE UP BHA #9. CHANGE BIT AND SERVICE MWD.
RIH TO 10130' BENCHMARK SURVEY @ 4306', OK. REAMED TO
10227' DRILLED TO 10320'
DRILLING MW: 0.0 VIS: 0
DRILLED TO 10337' ROP DROPPED FROM 30 FT/HR TO 2.0 FT/HR.
BIT QUIT. CIRCULATED @ 10337'. OBTAINED BOTTOMS UP. POH.
BENCHMARK SURVEY ON POH, OK. LD MWD AND PU BIT #7. TESTED
BOP STACK. REPLACE API RING ON CHOKE LINE. REPLACE LOWER
KELLY VALVE. TIGHTEN GRAYLOCK CLAMP BETWEEN BLIND RAMS AND
LOWER PIPE RAMS. TEST, OK. RIH TO 10337' WASHED THRU
BRIDGE @ 10056' WASHED TO BTM @ 10337' DRILLED TO
10388'.
DRILLING MW: 0.0 VIS: 0
DRILLED TO 10410'. ROP DROPPED FROM 20.0 FT/HR TO 2.0
FT/HR. STRING HUNG UP. CIRCULATED @ 10410'. MIXED AND
PUMPED SWEEP WHILE RECIPROCATE DRILLPIPE. CONTINUE TO
CONDITION MUD TO LSYP-5. BIT WOULD NOT DRILL OFF.
CIRCULATED @ 10425'. OBTAINED CLEAN RETURNS. POH. MOTOR
APPEARS TO HAVE FAILED. BERING CLEARANCE OK, BUT TIGHT
WHEN IN ROTARY. BENCHMARK SURVEY WAS OK. L/D BIT AND
MOTOR. L/D JARS, LEAKING OIL IN WEEP HOLE. MADE UP BHA
#11. P/U BIT, MOTOR, ORIENT MWD. MOTOR IS 7 3/4" F2000S
WITH 1.50 DEC BENT HOUSING. RIH TO 4052'. SERVICED BLOSK
LINE, LINE SLIPPED AND CUT. RIH TO 10345'. BEGAN
PRECAUTIONARY REAM. REAMED TO 10424' NO FILL. DRILLED
TO 10511'
WELL : DS 11-34
OPERATION:
RIG : NABORS 28E
PAGE: 4
11/12/94 (14)
TD:11079'( 568)
11/13/94 (15)
TD:ll183' ( 104)
11/14/94 (16)
TD:l1306' ( 123)
11/15/94 (17)
TD:l1306' ( 0)
DRILLING MW: 0.0 VIS: 0
DRILLED TO 10890'. STARTED SCHEDULE WIPER TRIP; DUE TO
TIME ELAPSED. POH TO 9500'. RIH TO 10890' NO HOLE
PROBLEMS OR FILL. DRILLED TO 11079'
DRILLING MW: 0.0 VIS: 0
DRILLED TO 11097'. ROP DROPPED FROM 30.0 FT/HR TO 2.0
FT/HR. STRING HUNG UP. CIRCULATED AT 11097'. OBTAINED
CLEAN RETURNS. POH. BENCHMARK SURVEY, OK. NO HOLE
PROBLEMS. MADE UP BHA #12. CHANGE BIT, MOTOR AND SERVICE
MWD. ORINTATE. P/U BUMPER SUB. RIH TO 10044'. REAMED TO
10080' REAM THROUGH BRIDGE F/ 10044 - 10080' RIH TO
11097'. DRILLED TO 11113' ROP DROPPED FROM ~.0 FT/HR TO
1.0 FT/HR. STRING HUNG UP. CIRCULATED AT 11113'. ROTATE
OFF BTM WHILE CIRC SWEEP. PMP LIQUID CSG AND LUBTEX F/
TORQUE. HOLE SWEPT WITH SLUG. DRILLED TO 11183'.
CIRCULATED MW: 0.0 VIS: 0
DRILLED TO 11246' STOPPED TO GET MWD LOG FOR GEOLOGY.
LAYED DOWN 5 JTS DP FOR MWD LOGGING PASS. REAM FOR MWD/LWD
LOGGING PASS F/ 11090 - 11246' WORK PIPE TO REAM AND
SLIDE TO BTM. DRILLED TO 1130~'. DOWNHOLE MEASUREMENT
TOOLS FAILED, END BHA RUN. TOOK MWD SURVEY AT 11306'
UNABLE TO GET TOOLFACE OF DIRECTIONAL SURVEYS. DOWHOLE
MEASUREMENT TOOLS FAILED, END BHA RUN. POH TO 9385'. RIH
TO 11306'. NO HOLE PROBLEMS ON WIPER TRIP. CIRCULATED AT
11306'. HOLE SWEPT WITH SLUG. CIRC SWEEP PRIOR TO POH F/
LOGS.
RIGGED DOWN SERVICE LINES MW: 0.0 VIS: 0
CIRCULATED AT 11306' OBTAINED CLEAN RETURNS. POH SLM, NO
CORRECTIONS. PULLED BHA. BHA LAID OUT. R/U ATLAS
WIRELINE AND M/U WIRELINE TOOLS. RIH W/ LOGGING TOOLS ON
DRILL PIPE TO 9620'. RIH W/ CHT/TEMP/GR/CN/AC/DIFL ON
DRILLPIPE TO 9620' AND STOP TO INSTALL SIDE ENTRY SUB AND
PMP DOWN ELECTIRC LINE BEFORE LOGGING. INSTALL SIDE ENTRY
SUB AND RIH W/ ELECTRIC LINE. RIH W/ DRILLPIPE LOGGING
DOWN. POH W/ DP LOGGING UP. DIFL LOG FAILED, ALL OTHER
LOGS OK. POH W/ WIRELINE AND L/D SIDE ENTRY SUB.
COMPLETED RUN WITH SETTING TOOLS FROM 9620 - 0.00 FT.
RIGGED DOWN SERVICE LINES.
WELL : DS 11-34
OPERATION:
RIG : NABORS 28E
PAGE: 5
11/16/94 (18)
TD:l1306' ( 0)
11/17/94 (19)
TD:l1306' ( 0)
11/18/94 (20)
TD:l1320' ( 14)
11/19/94 (21)
TD:11566' ( 246)
LAY DOWN DP TO 1395' MW: 0.0 VIS: 0
POH W/ DRILLPIPE, LOGGING TOOLS. EQUIPMENT WORK COMPLETED
AT SURFACE WITH WIRELINE LOGGING TOOLS. L/D WIRELINE TOOLS
AND SHEAVES. MADE UP BHA #13. P/U 9 7/8" HOLE OPENER BHA
FOR CLEANOUT RUN. RIH TO 4042'_ SERVICED BLOCK LINE.
LINE SLIPPED AND CUT. RIH TO 10050'. OBSERVED. REAMED TO
10170' REAMED THROUGH TIGHT SPOT @ 10056'_ RIH TO
11306'. NO OTHER HOLE PROBLEMS. CIRCULATED AT 11306'
RECIPROCATE AND ROTATE PIPE WHILE PUMPING. HOLE SWEPT WITH
SLUG. POH TO 9911' PULLED 15 STDS. LAID DOWN DRILL PIPE
TO 1395'.
DISPLACED SLURRY MW: 0.0 VIS: 0
PULLED BHA. BHA LAID OUT. NIPPLE UP BOP STACK. RIGGED
UP TOP RAM. CHANGED TOP RAMS TO 7 5/8"_ TEST SEALS. RUN
CASING 7 5/8". RIGGED UP CSG HANDLING EQUIPMENT. RAN
CASING TO 11282'. TIGHT HOLE FROM 10295 - 10580' WORKED
THROUGH WITH NO PROBLEM. CIRCULATED AT 11282' CIRCULATED
@ 8 BPM AND RECIPROCATE 20' STROKE. NO FLUID LOSSES.
OBTAINED CLEAN RETURNS. BATCH MIXED CEMENT WHILE
CIRCULATING. TESTED HIGH PRESSURE LINES. PRESSURE TEST
COMPLETED SUCCESSFULLY. PUMPED SPACERS. MIXED AND PUMPED
SLURRY. RELEASED TOP PLUG. DISPLACED SLURRY. PLUG DID
NOT BUMP. FLOATS HELD. RIGGED DOWN CASING HANDLING
EQUIPMENT. INSTALLED SEAL ASSEMBLY. 7 5/8" PACKOFF.
TESTED SEAL ASSEMBLY. RIG UP TOP RAMS TO 3 1/2" X 6"
V.B.R. WORK COMPLETED, TOP RAM IN POSITION. DISPLACED
SLURRY.
DRILLING MW: 0.0 VIS: 0
CHANGED OUT KELLY AND RIGGED UP TO HANDLE 3 1/2" DRILL
STRING. TESTED BOP STACK. INSTALL WEAR BUSHING. BHA # 14
MADE UP. TAGGED TOP PLUG @ 11122', 11175' ABOVE FLOAT
COLLAR AND TOP OF CEMENT. TEST 7 5/8" CASING. DRILLED
HARD CEMENT AND FLOAT EQUIPMENT AND CLEANED OUT RAT HOLE.
CIRCULATED AT 11310'. HOLE DISPLACED WITH WATER BASED MUD.
DRILLED TO 11320'.
PULLED BHA MW: 0.0 VIS: 0
DRILLED TO 11566'. UNABLE TO SLIDE. BUILDING TOO MUCH
ANGLE WHILE ROTATING. CIRCULATED AT 11566'. MONITOR WELL.
OBTAINED BOTTOMS UP/ POH TO 9670' DRILLSTRING HANDLING
EQUIPMENT FAILED, ABORT OPERATION. REPAIRED DRILLSTRING
HANDLING EQUIPMENT. POH TO 8720'. DRILLSTRING HANDLING
EQUIPMENT FAILED, ABORT OPERATION. REPAIRED DRILLSTRING
HANDLING EQUIPMENT. HOSE ON HYDRAULIC POWER UNIT FAILED.
POH TO 10460'. PULLED BHA. BHA STOOD BACK.
WELL : DS 11-34
OPERATION:
RIG : NABORS 28E
PAGE: 6
11/20/94 (22)
TD:ll700' ( 134)
11/21/94 (23)
TD:12020' ( 320)
11/22/94 (24)
TD:12382' ( 362)
11/23/94 (25)
TD:12832' ( 450)
11/24/94 (26)
TD: 12832' ( 0)
POH TO 8850' MW: 0.0 VIS: 0
MADE UP BHA #16. CHANGED MOTOR STABILIZER TO 6 1/4".
SERVICED MWD. CHECKED BIT AND UNPLUGGED ONE JET. FLOW
REST MWD. RIH TO 11516'. BEGAN PRECAUTIONARY MEASURES.
WASHED TO 11566'. DRILLED TO 11700'. BOPE DRILL (D-2).
BHA UNABLE TO SLIDE DUE TO MOTOR STALLING. WE ARE ABLE TO
GET WEIGHT TON THE BIT BUT THE PDC BIT IS TOO AGGRESSIVE
FOR MOTOR. BECAUSE OF THE MOTOR STALLING WE CANNOT KEEP A
GOOD TOOLFACE RESULTING IN A GOOD DOG LEG BUT TOO MUCH TURN
AND NOT ENOUGH DROP. CIRCULATED @ 11700' POH TO 8850'
CHECK SHOT SURVEY @ 11491'.
DRILLING MW: 0.0 VIS: 0
POH TO 1106' BOPE DRILL - D-1 DRILL. PULLED BHA. LAY
DOWN HALLIBURTON 4 3/4" DUAL STAGE MOTOR AND PDC BIT. BHA
STOOD BACK. PICKED UP HALLIBURTON 4 3/4" F2000S SINGLE
STAGE MOTOR AND NEW 6 3/4" F15DL BIT. SERVICE MWD.
CHANGED OUT 4 3/4" FLOAT SUB AND FLOAT. SERVICED BLOCK
LINE. LINE SLIPPED AND CUT. RIH TO 11609'. BOPE DRILL -
D-1 DRILL. BEGAN PRECAUTIONARY MEASURES. REAMED TO
11700'. DRILLED TO 12020'.
RIH TO 12382 MW: 0.0 VIS: 0
DRILLED TO 12382'_ REACHED PLANNED END OF RUN. MAXIMUM
HOURS ON BIT 20 3/4 HRS. CIRCULATED AT 12382' OBSERVED
WELL. OBTAINED BOTTOMS UP. POH TO 1100'. BENCHMARK
SURVEY @ 11555'. PULLED BHA. SERVICED MWD. MADE UP BHA #
17. MADE UP NEW BIT. RERUN 4 3/4" F2000S SINGLE STAGE
MOTOR W/ 1.25 DEG B.H. RIH TO 12382'.
POH FOR HOLE OPENER RUN MW: 0.0 VIS: 0
RIH TO 12315' BEGAN PRECAUTIONARY MEASURES. WASHED TO
12383'. DRILLED TO 12800'. CIRCULATED AT 12800'.
OBTAINED REQUIRED GEOLOGIC SAMPLES. DRILLED TO 12832'.
CIRCULATED AT 12832'. OBTAINED CLEAN RETURNS. POH TO
10425' FOR HOLE OPENER RUN.
RAN CSG TO 1614' MW: 0.0 VIS: 0
POOH TO 1100'_ PULLED BHA. CLEAR RIG FLOOR. BHA LAID
OUT. TESTED BOp STACK. PRESSURE TEST COMPLETED
SUCCESSFULLY - 5000 PSI. MADE UP BHA #18. RIH TO 12682'
NO PROBLEMS ENCOUNTERED. BOP DRILL D-1. BEGAN
PRECAUTIONARY MEASURES. REAMED TO 12832' ON BOTTOM.
CIRC AT 12832' SPOTTED 75 BBLS FLUID LOSS PILL ON BOTTOM.
OBTAINED CLEAN RETURNS - 150% HOLE VOLUME. POOH TO 997'
·
SLM-OBSERVE WELL @ 7-5/8" SHOE-NO PROBLEMS ENCOUNTERED. AT
BHA. PULLED BHA. CLEAR RIG FLOOR. BHA LAID OUT. SLOTTED
LINER. RIGGED UP CSG HANDLING EQUIP. WORK COMPLETED - CSG
HANDLING EQUIP IN POSITION. RAN CSG TO 1614'_ MADE UP
4-1/2" SLOTTED LINER. PREPARING TO RUN 2-1/16" WASH PIPE.
WELL : DS 11-34
OPERATION:
RIG : NABORS 28E
PAGE: 7
11/25/94 (27)
TD:12832' ( 0)
11/26/94 (28)
TD:12832' ( 0)
11/27/94 (29)
TD: 12832' ( 0)
LD DP TO 4000' MW: 0.0 VIS: 0
RAN CSG TO 1614' RAN 2-1/16" WASH STRING INSIDE 4-1/2"
SLOTTED LINER. ~ACKER ASSY INSTALLED. CIRC AT 1614'
OBTAINED BOTTOM UP (100% ANNULUS VOLUME). RAN CSG ON
LANDING STRING TO 12820'. AT SETTING DEPTH. CIRC AT
12820'. CIRC 20 BBL. DROP TIW SETTING BALL & SET HANGER.
PACKER AT 12820'. TESTED TBG. 30 MIN TEST. PRESSURE TEST
COMPLETED SUCCESSFULLY - 3500 PSI. TESTED CSG. TEST PACKER
& 7-5/8" CSG FOR 30 MIN. PRESSURE TEST COMPLETED
SUCCESSFULLY - 3500 PSI. CIRC AT 12748' RELEASED FROM
PACKER. PULLED UP 72' & SPOTTED LITHIUM TREATED INSIDE
LINER. OBTAINED REQ'D FLUID PROPERTIES - 100%, HOLE VOL.
LD DP TO 11161'. 55 JTS LAID OUT. CIRC AT 11161'. HOLE
DISPLACED WITH SEAWATER - 100% DISPLACED. LD DP TO 4000'
CIRC AT 10347' MW: 0.0 VIS: 0
LD DP TO 0' AT WELLHEAD. SERVICE BLOCK LINE. SLIPPED
AND CUT. LD TBG TO 0' L/D TIW RUNNING TOO; @ 2-1/16"
WASH STRING. COMPLETED OPERATIONS. REMOVED WEAR BUSHING.
EQUIP WORK COMPLETED. RIGGED UP TBG HANDLING EQUIP. WORK
COMPLETED. RAN TBG TO 10347'. 13CR80 COMPLETION WITH 6
GLMS & SSSV. HANGER LANDED. SSSV CONTROL LINE TESTED TO
5000 PSI. CIRC AT 10347'. HOLE DISPLACED WITH SEAWATER -
100% DISPLACED. SEA WATER TREATED WITH COREXIT 7726, 25
GAL/100 BBL.
FLUID SYSTEM MW: 0.0 VIS: 0
SETTING PACKER AT 10275'. PACKER SET AT 10275'. TESTED
TBG - VIA STRING. PRESSURE TEST COMPLETED SUCCESSFULLY -
4500 PSI. TESTED PERMANENT PACKER - VIA ANNULUS. SHEARED
RP VALVE IN TOP GLM AFTER TESTING PACKER. PRESSURE TEST
COMPLETED SUCCESSFULLY - 3500 PSI. RIGGED DOWN TBG
HANDLING EQUIP. WORK COMPLETED, EQUIP LAID OUT. INSTALLED
HANGER PLUG. WORK COMPLETED - HANGER PLUG IN POSITION.
RIGGED DOWN BOP STACK. WORK COMPLETED, EQUIP LAID OUT.
INSTALLED XMAS TREE. EQUIP WORK COMPLETED. TESTED ADAPTER
SPOOL AND TREE. PRESSURE TEST COMPLETED SUCCESSFULLY -
5000 PSI. REMOVED HANGER PLUG TEST PLUG. EQUIP WORK
COMPLETED. FREEZE PROTECT WELL - 91 BBL OF DIESEL.
COMPLETED OPERATIONS. INSTALLED HANGER PLUG. RUNNING TOOL
RETRIEVED.
SIGNATURE:
(drilling superintendent)
DATE:
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 1
PRUDHOE BAY DRILLING
PBU/ll-34
500292251600
NORTH SLOPE
COMPUTATION DATE: 11/28/94
DATE OF SURVEY: 112394
MWD SURVEY
JOB NUMBER: AK-MW-40089
KELLY BUSHING ELEV. = 62.50
OPERATOR: ARCO ALASKA INC
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
0 .00 -62.50
239 239.05 176.55
329 329.57 267.07
418 418.94 356.44
510 510.94 448.44
0 0 N .00 E .00 .00N .00E
0 12 S 52.00 W .08 .26S .33W
0 24 S 78.90 W .26 .41S .76W
0 48 N 81.70 W .50 .38S 1.69W
1 54 N 65.30 W 1.25 .35N 3.71W
.00
.15
.44
1.25
3.36
598 598.58 536.08
688 688.08 625.58
779 778.12 715.62
876 874.79 812.29
970 968.35 905.85
3 30 N 67.10 W 1.83 2.00N 7.50W
5 11 N 55.80 W 2.11 5.35N 13.39W
6 24 N 56.00 W 1.33 10.47N 20.96W
7 30 N 56.00 W 1.13 17.06N 30.73W
8 36 N 55.50 W 1.17 24.51N 41.67W
7.45
14.23
23.36
35.13
48.34
1068 1064.89 1002.39
1161 1156.46 1093.96
1256 1250.29 1187.79
1352 1344.76 1282.26
1447 1436.82 1374.32
9 18 N 57.90 W .81 32.85N 54.38W
9 18 N 63.00 W .89 40.24N 67.41W
10 23 N 61.50 W 1.19 47.83N 81.82W
12 0 N 61.30 W 1.66 56.79N 98.24W
11 41 N 63.90 W .65 65.68N 115.38W
63.53
78.50
94.77
113.46
132.73
1542 1529.75 1467.25
1637 1621.79 1559.29
1731 1712.98 1650.48
1827 1804.63 1742.13
1923 1896.42 1833.92
13 48 N 68.50 W 2.45 74.10N 134.64W
14 30 N 68.00 W .75 82.70N 156.19W
16 6 N 68.00 W 1.69 92.04N 179.32W
16 47 N 66.40 W .87 102.54N 204.26W
17 36 N 65.30 W .90 114.17N 230.18W
153.57
176.47
201.11
227.89
256.10
2017 1985.77 1923.27
2111 2075.37 2012.87
2204 2163.75 2101.25
2301 2254.27 2191.77
2395 2342.37 2279.87
17 36 N 64.40 W .29 126.21N 255.84W
18 36 N 65.00 W 1.08 138.72N 282.32W
19 36 N 64.10 W 1.11 151.88N 309.95W
20 30 N 64.40 W .94 166.23N 339.70W
21 17 N 61.59 W 1.36 181.51N 369.66W
284.29
313.43
343.89
376.79
410.34
2490 2430.31 2367.81
2584 2514.83 2452.33
2679 2597.11 2534.61
2775 2679.44 2616.94
2872 2759.32 2696.82
24 0 N 60.60 W 2.86 199.27N 401.78W
27 30 N 63.00 W 3.89 218.48N 437.72W
30 47 N 65.20 W 3.68 238.48N 479.01W
32 54 N 63.40 W 2.38 260.68N 525.09W
34 35 N 63.60 W 1.77 284.49N 572.85W
447.01
487.72
533.41
584.34
637.54
2967 2836.60 2774.10
3061 2911.94 2849.44
3158 2988.20 2925.70
3253 3062.55 3000.05
3347 3135.31 3072.81
36 35 N 62.50 W 2.21 309.58N 622.16W
37 17 N 63.40 W .94 335.35N 672.64W
38 30 N 62.00 W 1.53 362.58N 725.38W
39 17 N 60.80 W 1.15 391.30N 778.05W
39 42 N 60.80 W .42 420.56N 830.41W
692.73
749.27
808.51
868.44
928.39
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 2
PRUDHOE BAY DRILLING
PBU/ll-34
500292251600
NORTH SLOPE
COMPUTATION DATE: 11/28/94
DATE OF SURVEY: 112394
MWD SURVEY
JOB NUMBER: AK-MW-40089
KELLY BUSHING ELEV. = 62.50
OPERATOR: ARCO ALASKA INC
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
iNCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
3443 3208.85 3146.35
3538 3282.05 3219.55
3633 3356.58 3294.08
3730 3432.86 3370.36
3825 3507.95 3445.45
40 5 N 60.00 W .68 450.94N 883.87W
38 47 N 60.20 W 1.38 480.96N 936.08W
38 12 N 60.80 W .74 510.16N 987.68W
37 30 N 65.00 W 2.76 537.16N 1040.40W
37 42 N 65.80 W .56 561.23N 1092.98W
989.86
1050.08
1109.35
1168.44
1225.91
3921 3583.82 3521.32
3984 3633.37 3570.87
4116 3737.50 3675.00
4212 3813.23 3750.73
4306 3887.89 3825.39
38 0 N 65.50 W .37 585.54N 1146.69W
38 12 N 64.80 W .76 601.86N 1181.95W
37 47 N 66.70 W .94 635.28N 1256.11W
37 47 N 65.80 W .58 658.94N 1309.88W
37 12 N 66.40 W .75 682.15N 1362.25W
1284.46
1323.09
1403.87
1462.14
1518.99
4403 3965.39 3902.89
4500 4041.02 3978.52
4592 4113.16 4050.66
4689 4187.89 4125.39
4785 4262.45 4199.95
37 30 N 65.80 W .48 706.11N 1416.33W
38 54 N 67.10 W 1.68 729.88N 1470.88W
39 17 N 64.40 W 1.88 753.96N 1524.32W
39 5 N 65.00 W .45 780.01N 1579.43W
39 0 N 63.70 W .86 806.18N 1633.94W
1577.68
1636.68
1694.89
1755.54
1815.75
4880 4336.17 4273.67
4974 4409.14 4346.64
5067 4481.73 4419.23
5165 4557.14 4494.64
5261 4631.96 4569.46
39 12 N 62.70 W .70 833.20N 1687.42W
39 5 N 66.90 W 2.82 858.48N 1741.13W
39 0 N 65.30 W 1.08 882.33N 1794.97W
39 5 N 66.00 W .47 907.55N 1850.70W
38 54 N 65.20 W .56 932.58N 1905.87W
1875.50
1934.56
1992.99
2053.75
2113.93
5355 4705.00 4642.50
5450 4779.51 4717.01
5546 4854.01 4791.51
5643 4929.34 4866.84
5738 5003.63 4941.13
38 54 N 65.00 W .13 957.39N 1959.33W
39 0 N 66.00 W .66 982.37N 2014.14W
39 0 N 65.20 W .53 1007.29N 2069.07W
38 47 N 65.30 W .22 1032.74N 2124.28W
38 42 N 64.40 W .60 1058.08N 2178.24W
2172.54
2232.38
2292.30
2352.72
2412.03
5833 5077.54 5015.04
5929 5152.53 5090.03
6025 5227.84 5165.34
6119 5301.32 5238.82
6215 5375.87 5313.37
38 35 N 65.00 W .41 1083.34N 2231.68W
38 17 N 64.30 W .55 t108.83N 2285.49W
38 47 N 64.40 W .52 1134.80N 2339.59W
38 54 N 63.60 W .54 1160.75N 2392.78W
38 42 N 64.60 W .69 1186.93N 2446.70W
2470.84
2530.10
2589.84
2648.81
2708.50
6311 5450.78 5388.28
6406 5524.19 5461.69
6502 5598.70 5536.20
6597 5672.66 5610.16
6691 5744.81 5682.31
38 54 N 65.00 W .33 1212.58N 2501.20W
39 5 N 65.00 W .21 1237.70N 2555.08W
39 12 N 64.60 W .28 1263.53N 2609.96W
39 12 N 64.30 W .20 1289.54N 2664.38W
40 0 N 61.60 W 2 0~ 12 6_ ~9N 2717.52W
t c
~nohor:
2768.43
2827.55
2887.89
2947.93
3007.47
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 3
PRUDHOE BAY DRILLING
PBu/11-34
500292251600
NORTH SLOPE
COMPUTATION DATE: 11/28/94
DATE OF SURVEY: 112394
MWD SURVEY
JOB NUMBER: AK-MW-40089
KELLY BUSHING ELEV. = 62.50 FT.
OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
6757 5795.69 5733.19
6854 5870.02 5807.52
6948 5941.84 5879.34
7046 6017.36 5954.86
7139 6089.04 6026.54
40 5 N 60.40 W 1.17 1337.42N 2754.92W
40 0 N 61.50 W .74 1367.76N 2809.54W
39 42 N 62.20 W .58 1396.04N 2862.39W
39 42 N 59.90 W 1.50 1426.39N 2917.25W
39 24 N 61.60 W 1.21 1455.31N 2968.88W
3050.21
3112.65
3172.51
3235.16
3294.32
7233 6162.03 6099.53
7327 6234.53 6172.03
7423 6308.80 6246.30
7518 6382.16 6319.66
7608 6452.75 6390.25
39 17 N 61.50 W .13 1483.82N 3021.51W
39 30 N 60.80 W .52 1512.55N 3073.66W
39 5 N 62.00 W .89 1541.65N 3127.03W
38 42 N 63.70 W 1.21 1568.67N 3179.69W
38 54 N 62.00 W 1.20 1594.56N 3230.19W
3354.11
3413.62
3474.35
3533.40
3590.02
7705 6528.21 6465.71
7799 6601.79 6539.29
7894 6676.01 6613.51
7987 6749.22 6686.72
8081 6823.27 6760.77
38 42 N 63.00 W .68 1622.58N 3284.01W
38 30 N 63.00 W .21 1649.25N 3336.34W
38 24 N 64.10 W .73 1675.49N 3389.10W
38 17 N 63.00 W .74 1701.29N 3440.96W
38 0 N 63.20 W .34 1727.61N 3492.84W
3650.58
3709.18
3767.92
3825.65
3883.67
8179 6900.24 6837.74
8273 6974.82 6912.32
8363 7046.57 6984.07
8457 7122.59 7060.09
8552 7199.03 7136.53
37 35 N 63.00 W .43 1754.62N 3546.08W
37 12 N 63.60 W .58 1780.24N 3597.02W
36 47 N 63.90 W .49 1804.16N 3645.51W
36 12 N 64.80 W .85 1828.51N 3696.21W
36 24 N 64.30 W .38 1852.64N 3746.92W
3943.22
4000.08
4053.96
4109.97
4165.85
8645 7273.98 7211.48
8740 7349.11 7286.61
8835 7423.96 7361.46
8925 7495.57 7433.07
9016 7568.45 7505.95
37 0 N 64.10 W .65 1876.95N 3797.21W
37 47 N 62.00 W 1.59 1902.99N 3848.40W
38 0 N 61.50 W .39 1930.57N 3899.73W
37 17 N 62.30 W .94 1956.59N 3948.46W
36 35 N 63.20 W .97 1981.70N 3997.19W
4221.49
4278.77
4336.98
4392.15
4446.85
9113 7645.81 7583.31
9208 7722.07 7659.57
9305 7798.68 7736.18
9398 7873.11 7810.61
9492 7949.29 7886.79
36 42 N 63.00 W .16 2007.74N 4048.52W
37 17 N 61.50 W 1.13 2034.50N 4099.38W
37 5 N 62.20 W .49 2061.93N 4150.65W
36 30 N 61.50 W .79 2088.20N 4199.74W
36 5 N 61.50 W .42 2114.90N 4248.91W
4504.25
4561.63
4619.71
4675.31
4731.22
9588 8027.51 7965.01
9666 8091.63 8029.13
9767 8174.42 8111.92
9856 8246.65 8184.15
9886 8271.16 8208.66
34 42 N 64.80 W 2.47 2140.02N 4298.48W
34 15 N 65.74 W .90 2158.44N 4338.46W
35 25 N 67.40 W 1.49 2181.34N 4391.33W
35 45 N 67.66 W .42 2201.09N 4439.10W
37 17 N 67.80 W 5.06 2207.97N 4455.90W
4786.64
4830.40
4887.50
4938.63
4956.57
RECEIVED
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 4
PRUDHOE BAY DRILLING
PBU/ll-34
500292251600
NORTH SLOPE
COMPUTATION DATE: 11/28
/94
DATE OF SURVEY: 112394
MWD SURVEY
JOB NUMBER: AK-MW-40089
KELLY BUSHING ELEV. = 62.50
OPERATOR: ARCO ALASKA INC
FT.
TRUE SUB-SEA COURS
MEASD VERTICAL VERTICAL INCLN
DEPTH DEPTH DEPTH DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
9904 8285.21 8222.71
9935 8309.79 8247.29
9966 8333.45 8270.95
9998 8356.38 8293.88
10029 8378.61 8316.11
37 54 N 68.30 W 3.80 2212.02N 4465.93W
39 30 N 68.80 W 5.18 2219.22N 4484.26W
41 30 N 67.00 W 7.44 2226.82N 4502.98W
44 0 N 65.40 W 8.73 2235.38N 4522.37W
46 47 N 61.80 W 11.99 2245.42N 4542.55W
4967.25
4986.67
5006.64
5027.66
5050.13
10061 8400 . 08 8337 . 58
10094 8421.26 8358 . 76
10126 8441 . 93 8379 . 43
10157 8461 . 01 8398 . 51
10188 8479 . 98 8417 . 48
48 47 N 60.00 W 7.52 2256.94N 4563.23W
49 47 N 60.00 W 3.08 2269.25N 4584.56W
51 54 N 58.00 W 7.97 2282.33N 4606.31W
52 5 N 57.80 W .82 2295.30N 4626.99W
51 47 N 58.50 W 2.04 2308.09N 4647.58W
5073.79
5098.41
5123.80
5148.20
5172.44
10217 8497.71 8435.21
10250 8518.13 8455.63
10281 8537.49 8474.99
10313 8556.95 8494.45
10344 8574.55 8512.05
51 42 N 57.30 W 3.31 2320.04N 4666.63W
51 35 N 57.90 W 1.46 2333.87N 4688.43W
51 47 N 57.00 W 2.35 2347.06N 4709.09W
53 42 N 55.60 W 6.85 2361.27N 4730.38W
56 17 N 54.60 W 8.88 2375.65N 4750.99W
5194.92
5220.73
5245.23
5270.80
5295.87
10376 8591.57 8529.07
10407 8606.87 8544.37
10436 8620.11 8557.61
10469 8632.98 8570.48
10499 8643.70 8581.20
59 17 N 52.80 W 10.53 2391.66N 4772.77W
61 47 N 52.00 W 8.34 2408.19N 4794.23W
64 48 N 51.40 W 10.34 2424.50N 4814.89W
68 24 N 50.40 W 11.46 2443.26N 4837.96W
70 35 N 50.60 W 7.21 2461.51N 4860.10W
5322.78
5349.69
5375.80
5405.25
5433.62
10531 8653.60 8591.10
10564 8663.13 8600.63
10595 8671.75 8609.25
10627 8680.76 8618.26
10657 8689.08 8626.58
73 0 N 49.70 W 8.04 2480.79N 4883.20W
73 35 N 49.30 W 2.15 2501.41N 4907.35W
73 48 N 49.30 W .65 2520.65N 4929.71W
73 41 N 49.50 W .67 2540.77N 4953.18W
74 18 N 49.10 W 2.36 2559.68N 4975.17W
5463.36
5494.67
5523.76
5554.23
5582.83
10689 869'7.61 8635.11
10721 8705.87 8643.37
10753 8714.23 8651.73
10784 8722.27 8659.77
10815 8730.24 8667.74
74 48 N 49.60 W 2.17 2579.79N 4998.59W
74 48 N 48.00 W 4.90 2599.81N 5021.46W
74 54 N 48.30 W .96 2620.42N 5044.47W
75 0 N 47.80 W 1.59 2640.40N 5066.70W
75 5 N 48.10 W .99 2660.39N 5088.86W
5613.25
5643.17
5673.50
5702.86
5732.14
10847 8738.39 8675.89
10881 8746.64 8684.14
10913 8753.83 8691.33
10942 8759.98 8697.48
10973 8766.52 8704.02
75 24 N 47.30 W 2.59 2681.23N 5111.77W
76 30 N 47.70 W 3.43 2703.51N 5136.07W
77 35 N 47.00 W 4.03 2724.69N 5159.07W
78 0 N 47.50 W 2.17 2743.98N 5179.94W
78 5 N 46.90 W 1.88 2764.99N 5202.62W
5762.52
5794.83
5825.45
5853.27
5883.54
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 5
PRUDHOE BAY DRILLING
PBU/11-34
500292251600
NORTH SLOPE
COMPUTATION DATE: 11/28/94
DATE OF SURVEY: 112394
MWD SURVEY
JOB NUMBER: AK-MW-40089
KELLY BUSHING ELEV. = 62.50 FT.
OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECT ION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
11005 8772.98 8710.48
11047 8781.48 8718.98
11076 8787.39 8724.89
11108 8793.20 8730.70
11140 8797.65 8735.15
78 18 N 46.80 W .70 2786.13N 5225.17W
78 11 N 45.00 W 4.23 2814.58N 5254.53W
78 35 N 44.20 W 2.99 2835.07N 5274.74W
80 35 N 45.00 W 6.68 2857.59N 5296.95W
83 18 N 46.60 W 9.83 2879.56N 5319.55W
5913.76
5953.57
5981.45
6012.09
6042.78
11173 8800.75 8738.25
11201 8802.67 8740.17
11234 8804.81 8742.31
11265 8806.69 8744.19
11300 8807.99 8745.49
85 48 N 46.50 W 7.67 2901.89N 5343.12W
86 18 N 44.40 W 7.74 2921.37N 5362.90W
86 18 N 44.40 W .00 2945.02N 5386.06W
86 48 N 44.40 W 1.60 2967.25N 5407.83W
89 0 N 45.60 W 7.06 2992.30N 5432.89W
6074.49
6101.48
6133.51
6163.62
6198.00
11328 8808.06 8745.56
11360 8807.28 8744.78
11395 8805.56 8743.06
11425 8803.57 8741.07
11457 8801.37 8738.87
90 41 N 47.60 W 9.48 3011.33N 5453.01W
92 5 N 48.30 W 4.91 3032.66N 5476.65W
93 35 N 48.30 W 4.33 3055.66N 5502.47W
93 54 N 48.50 W 1.19 3075.77N 5525.12W
94 0 N 48.80 W .98 3096.86N 5549.09W
6225.05
6256.31
6290.28
6320.05
6351.46
11491 8798.86 8736.36
11522 8796.43 8733.93
11553 8794.01 8731.51
11583 8791.86 8729.36
11616 8789.88 8727.38
94 30 N 48.20 W 2.30 3119.24N 5574.38W
94 30 N 48.00 W .64 3139.82N 5597.31W
94 30 N 48.10 W .32 3160.41N 5620.22W
93 35 N 47.70 W 3.24 3180.76N 5642.75W
93 11 N 45.80 W 5.82 3203.54N 5666.96W
6384.67
6414.93
6445.17
6474.96
6507.45
11647 8788.35 8725.85
11680 8787.00 8724.50
11707 8786.08 8723.58
11740 8785.04 8722.54
11773 8783.95 8721.45
92 30 N 46.50 W 3.20 3224.90N 5689.20W
92 11 N 46.30 W 1.09 3247.65N 5713.09W
91 41 N 47.90 W 6.23 3265.95N 5732.79W
91 54 N 48.20 W 1.09 3288.13N 5757.46W
91 54 N 48.00 W .61 3310.08N 5781.92W
6537.52
6569.71
6596.02
6628.59
6660.87
11805 8782.63 8720.13
11838 8781.16 8718.66
11872 8779.80 8717.30
11901 8778.63 8716.13
11932 8777.22 8714.72
92 48 N 48.80 W 3.75 3331.35N 5805.88W
92 18 N 48.00 W 2.86 3353.22N 5830.51W
92 18 N 48.90 W 2.64 3375.76N 5855.94W
92 24 N 48.00 W 3.18 3394.63N 5877.23W
92 48 N 49.60 W 5.28 3415.14N 5900.67W
6692.36
6724.74
6758.14
6786.11
6816.77
11965 8775.88 8713.38
11995 8774.99 8712.49
12027 8774.36 8711.86
12058 8774.20 8711.70
12087 8774.60 8712.10
91 54 N 48.40 W 4.58 3436.62N 5925.37W
91 24 N 50.20 W 6.10 3456.56N 5948.55W
90 54 N 50.00 W 1.72 3476.68N 5972.62W
89 41 N 48.80 W 5.37 3497.23N 5996.59W
·
88 41 N 48 80 W 3
6849.00
6879.15
6910.14
6941.27
6969.21
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
PRUDHOE BAY DRILLING
PBU/11-34
500292251600
NORTH SLOPE
COMPUTATION DATE: 11/28/9
DATE OF SURVEY: 112394
MWD SURVEY
JOB NUMBER: AK-MW-40089
KELLY BUSHING ELEV. = 62.50 FT.
OPERATOR: ARCO ALASKA INC
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS COURSE DLS TOTAL
INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
12123 8775.84 8713.34 87 24 N 48.20 W 3.91 3540.17N 6045.35W 7005.18
12155 8777.18 8714.68 87 48 N 48.30 W 1.29 3561.46N 6069.20W 7036.59
12187 8778.15 8715.65 88 41 N 48.00 W 3.00 3582.52N 6092.71W 7067.60
12220 8778.67 8716.17 89 30 N 49.20 W 4.35 3604.41N 6117.55W 7100.17
12252 8778.64 8716.14 90 35 N 48.20 W 4.63 3625.60N 6141.67W 7131.76
12283 8778.34 8715.84 90 30 N 48.50 W 1.01 3646.33N 6164.98W 7162.41
12315 8778.14 8715.64 90 11 N 48.20 W 1.33 3667.57N 6188.86W 7193.82
12349 8778.08 8715.58 90 0 N 49.10 W 2.74 3689.80N 6214.11W 7226.91
12380 8778.25 8715.75 89 24 N 48.30 W 3.18 3710.57N 6237.76W 7257.88
12415 8779.08 8716.58 87 48 N 47.10 W 5.86 3733.54N 6263.00W 7291.35
12445 8780.46 8717.96 87 0 N 47.10 W 2.63 3754.20N 6285.23W 7321.05
12476 8782.25 8719.75 86 24 N 47.20 W 1.96 3775.24N 6307.92W 7351.33
12508 8784.12 8721.62 86 54 N 46.10 W 3.77 3797.17N 6331.15W 7382.54
12540 8785.54 8723.04 88 0 N 46.60 W 3.78 3819.24N 6354.28W 7413.73
12571 8786.05 8723.55 90 5 N 46.90 W 6.84 3840.47N 6376.85W 7444.02
12603 8785.52 8723.02 91 48 N 44.30 W 9.61 3863.08N 6399.94W 7475.45
12634 8784.57 8722.07 91 41 N 45.10 W 2.59 3885.18N 6421.81W 7505.58
12664 8783.97 8721.47 90 35 N 46.00 W 4.75 3906.14N 6443.18W 7534.70
12696 8784.27 8721.77 88 18 N 45.40 W 7.60 3927.98N 6465.56W 7565.13
12728 8785.34 8722.84 87 54 N 44.10 W 4.20 3950.96N 6488.34W 7596.50
12757 8786.40 8723.90 88 0 N 43.70 W 1.39 3972.23N 6508.80W 7624.99
12831 8788.95 8726.45 88 0 N 43.70 W .00 4025.00N 6559.23W 7695.40
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 7695.72 FEET
AT NORTH 58 DEG. 27 MIN. WEST AT MD = 12831
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 301.01 DEG.
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 7
PRUDHOE BAY DRILLING
PBU/ll-34
500292251600
NORTH SLOPE
COMPUTATION DATE: 11/28/94
DATE OF SURVEY: 112394
JOB NUMBER: AK-MW-40089
KELLY BUSHING ELEV. = 62.50
OPERATOR: ARCO ALASKA INC
FT.
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE
VERTICAL
CORRECTION
0 .00 -62.50 .00 N .00 E .00
1000 997.14 934.64 26.98 N 45.25 W 2.86
2000 1969.39 1906.89 123.97 N 251.15 W 30.61
3000 2863.01 2800.51 318.63 N 639.56 W 136.99
4000 3645.81 3583.31 606.03 N 1190.80 W 354.19
2.86
27.74
106.38
217.20
5000 4428.95 4366.45 864.79 N 1755.94 W 571.05
6000 5207.89 5145.39 1127.88 N 2325.13 W 792.11
7000 5981.49 5918.99 1411.45 N 2891.48 W 1018.51
8000 6758.87 6696.37 1704.75 N 3447.75 W 1241.13
9000 7554.82 7492.32 1977.13 N 3988.16 W 1445.18
216.86
221.05
226.40
222.63
204.05
10000 8357.76 8295.26 2235.94 N 4523.58 W 1642.24
11000 8771.85 8709.35 2782.40 N 5221.21 W 2228.15
12000 8774.89 8712.39 3459.22 N 5951.74 W 3225.11
12831 8788.95 8726.45 4025.00 N 6559.23 W 4042.05
197.06
585.91
996.96
816.95
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 8
PRUDHOE BAY DRILLING
PBU/ll-34
500292251600
NORTH SLOPE
COMPUTATION DATE: 11/28/94
DATE OF SURVEY: 1123 94
JOB NUMBER: AK-MW-40089
KELLY BUSHING ELEV. = 62.50 FT.
OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
0 .00 -62.50
62 62.50 .00
162 162.50 100.00
262 262.50 200.00
362 362.50 300.00
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
.00 N .00 E
.00 N .00 E
.09 S .12 W
.31 S .39 W
.46 S .99 W
MD-TVD VERTICAL
DIFFERENCE CORRECTION
.00
.00 .00
.00 .00
.00 .00
.00 .00
462 462.50 400.00
562 562.50 500.00
662 662.50 600.00
763 762.50 700.00
863 862.50 800.00
.27 S 2,32 W .01 .01
1.14 N 5.46 W .08 .06
4.04 N 11.46 W .31 .23
9.49 N 19.51 W .78 .48
16.16 N 29.39 W 1.49 .71
964 962.50 900.00
1066 1062.50 1000.00
1167 1162.50 1100.00
1269 1262.50 1200.00
1371 1362.50 1300.00
24.01 N 40,94 W
32.64 N 54,05 W
40.69 N 68.29 W
48.90 N 83.79 W
58.60 N 101.55 W
2.47 .97
3.70 1.23
5.03 1.33
6.56 1.53
8.59 2.04
1473 1462.50 1400.00
1576 1562.50 1500.00
1679 1662.50 1600.00
1783 1762.50 1700.00
1887 1862.50 1800.00
68
77
86
97
109
.02 N 120,16 W
.05 N 142,12 W
.64 N 165,95 W
.44 N 192,60 W
.67 N 220.41 W
10.75 2.15
13.54 2.79
16.79 3.25
20.85 4.06
25.36 4.51
1992 1962.50 1900.00
2097 2062.50 2000.00
2203 2162.50 2100.00
2310 2262.50 2200.00
2417 2362.50 2300.00
123.02 N 249,18 W
136.89 N 278,39 W
151.68 N 309,55 W
167,56 N 342.48 W
185.33 N 376,68 W
30.27 4.91
35.37 5.10
41.15 5.78
47.63 6.48
54.81 7.18
2526 2462.50 2400.00
2639 2562.50 2500.00
275S 2662.50 2600.00
2875 2762.50 2700.00
2999 2862.50 2800.00
206.42 N 414.74 W
229.93 N 460,88 W
255.77 N 515.29 W
285.47 N 574,82 W
318.46 N 639,23 W
63.88 9.08
76.52 12.64
93.29 16.76
113.41 20.12
136.86 23.46
3125 2962.50 2900.00
3253 3062.50 3000.00
3383 3162.50 3100.00
3513 3262.50 3200.00
3641 3362.50 3300.00
352
391
431
473
512
.98 N
.28 N
.58 N
.15 N
.41 N
707.33 W
778. O1 W
850.11 W
922.44 W
M~s~-~, Oil & G~s Cons. Commiss~o~
162.69 25.82
191.00 28.31
220.70 29.70
250.94 30.23
278.79 27.85
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 9
PRUDHOE BAY DRILLING
PBU/ll-34
500292251600
NORTH SLOPE
COMPUTAT I ON DATE: 11 / 28 / 94
DATE OF SURVEY: 112394
JOB NUMBER: AK-MW-40089
KELLY BUSHING ELEV. = 62.50 FT.
OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
3767 3462.50 3400.00
3894 3562.50 3500.00
4021 3662.50 3600.00
4147 3762.50 3700.00
4274 3862.50 3800.00
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
546.76 N 1061.02 W
578.63 N 1131.54 W
611.62 N 1202.69 W
642.95 N 1273.92 W
674.43 N 1344.59 W
MD-TVD VERTICAL
DIFFERENCE CORRECTION
305.21 26.42
331.65 26.44
358.74 27.09
385.45 26.71
411.89 26.44
4400 3962.50 3900.00
4527 4062.50 4000.00
4656 4162.50 4100.00
4785 4262.50 4200.00
4914 4362.50 4300.00
705.20 N 1414.30 W
736.62 N 1486.85 W
771.28 N 1560.72 W
806.20 N 1633.98 W
842.76 N 1706.61 W
437.61 25.72
465.10 27.49
494.18 29.07
522.97 28.79
551.86 28.89
5043 4462.50 4400.00
5171 4562.50 4500.00
5300 4662.50 4600.00
5429 4762.50 4700.00
5557 4862.50 4800.00
875.82 N 1780.82 W
909.32 N 1854.68 W
942.92 N 1928.24 W
976.77 N 2001.55 W
1010.17 N 2075.31 W
580.70 28.84
609.46 28.75
638.07 28.61
666.60 28.53
695.28 28.68
5686 4962.50 4900.00
5814 5062.50 5000.00
5942 5162.50 5100.00
6070 5262.50 5200.00
6198 5362.50 5300.00
1043.90 N 2148.48 W
1078.26 N 2220.80 W
1112.24 N 2292.59 W
1146.88 N 2364.71 W
1182.34 N 2437.02 W
723.69 28.42
751.80 28.11
779.50 27.70
807.57 28.07
835.97 28.40
6326 5462.50 5400.00
6455 5562.50 5500.00
6584 5662.50 5600.00
6714 5762.50 5700.00
6845 5862.50 5800.00
1216.57 N 2509.77 W
1250.88 N 2583.29 W
1285.95 N 2656.91 W
1323.75 N 2730.58 W
1364.75 N 2804.00 W
864.28 28.31
893.06 28.77
922.09 29.04
951.94 29.84
982.60 30.66
6975 5962.50 5900.00
7105 6062.50 6000.00
7234 6162.50 6100.00
7364 6262.50 6200.00
7492 6362.50 6300.00
1404.04 N 2877.57 W
1444.94 N 2949.71 W
1484.00 N 3021.84 W
1523.79 N 3093.79 W
1561.69 N 3165.58 W
1012.82 30.22
1042.74 29.92
1072.08 29.34
1101.54 29.46
1130.34 28.81
7621 6462.50 6400.00
7749 6562.50 6500.00
7877 6662.50 6600.00
8004 6762.50 6700.00
8131 6862.50 6800.00
1598.26 N 3237.14 W
1635.04 N 3308.47 W
1670.82 N 3379.47 W
1706.05 N 3450.30 W
1741.42 N 3520.14 W
1158.64 28.30
1186.86 28.22
1214.62 27.75
1242.13 27.51
1269.13 27.00
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 10
PRUDHOE BAY DRILLING
PBU/ll-34
500292251600
NORTH SLOPE
COMPUTATION DATE: 11/28/94
DATE OF SURVEY: 112394
JOB NUMBER: AK-MW-40089
KELLY BUSHING ELEV. = 62.50
OPERATOR: ARCO ALASKA INC
FT.
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
8257 6962.50 6900.00 1776.08 N 3588.64 W 1295.20 26.07
8382 7062.50 7000.00 1809.40 N 3656.21 W 1320.40 25.20
8507 7162.50 7100.00 1840.98 N 3722.65 W 1344.55 24.15
8631 7262.50 7200.00 1873.17 N 3789.43 W 1369.03 24.48
8757 7362.50 7300.00 1907.87 N 3857.57 W 1394.93 25.90
8884 7462.50 7400.00 1944.88 N 3926.15 W 1421.71 26.78
9009 7562.50 7500.00 1979.70 N 3993.25 W 1447.07 25.36
9134 7662.50 7600.00 2013.39 N 4059.61 W 1471.72 24.65
9259 7762.50 7700.00 2049.17 N 4126.44 W 1497.21 25.49
9384 7862.50 7800.00 2084.45 N 4192.84 W 1522.33 25.12
9508 7962.50 7900.00 2119.50 N 4257.38 W 1546.40 24.07
9631 8062.50 8000.00 2150.25 N 4320.37 W 1568.54 22.14
9752 8162.50 8100.00 2178.08 N 4383.50 W 1590.05 21.50
9875 8262.50 8200.00 2205.51 N 4449.87 W 1613.16 23.12
10006 8362.50 8300.00 2238.02 N 4527.85 W 1644.21 31.05
10160 8462.50 8400.00 2296.32 N 4628.62 W 1697.84 53.63
10323 8562.50 8500.00 2365.66 N 4736.74 W 1760.66 62.81
10562 8662.50 8600.00 2500.03 N 4905.73 W 1900.01 139.36
10954 8762.50 8700.00 2752.02 N 5188.69 W 2192.02 292.01
10980 8767.76 8705.26 2769.01 N 5206.92 W 2212.24 20.21
THE CALCULATION PROCEDURES USE A, LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
D I:::! ! I--I-- I I~1 [~ S E~ I:::t U' I I~ 1::: S
To: ARCO Alaska Inc. January 22, 1995
Attn: Larry Grant, AOGCC
P.O. Box 100360
Anchorage, Alaska 99510-0360 ~
MWD Formation Evaluation Logs
The technical data listed below is being submitted herewith.
concerns to the attention of:
Please address any problems or
Jim Galvin, Sperry-Sun Drilling Services, 5631 Silvemdo Way, #G, Anchorage, AK 99518
2" x 5" MD Gamma Ray Logs:
2" x 5" TVD Gamma Ray Logs:
.
1 Blueline
1 Folded Sepia
1 Blueline
1 Folded Sepia
dAR 2 4 1995
Oil & Gas Cons. commiB~ion
Anchor~_;9
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 ° Fax (907) 563-7252
A Dresser Industries, Inc. Company
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 21 November 1994
RE:
Transmittal of Data
Sent by: MAIL
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL # DESCRIPTION
1 PLS FINAL BL + RF
1 PLS FINAL BL + RF
1 PFC/PERF FINAL BL+RF
1 PLS. FINAL BL + RF
1 PLS FINAL BL + RF
1 DIFL/GR FINAL BL+RF
1 BHC/GR FINAL BL+RF
1 CN/GR FINAL BL+RF
1 SSTVD FINAL BL+RF
Run # 1
Run # 1
Run # 1
Run # 1
Run ~ 1
Run ~ 1
Run ~ 1
Run # 1
Run # 1
ECC No.
1187.03
1341.01
6010.06
6063.01
6299.03
6301.00
Please sign and return to: At~s Wireline Ser~
5600~Street / ~
Atari. Rodney D .~F~-se~
~ ~r~to (907) 563-7803
Received by: .
D I::i I I--I--I ~ CS
November 28, 1994
ARCO Alaska, Inc.
AOGCC, Larry Grant
PO Box 100360
Anchorage, AK 99510-0360
Re: Survey Data - Well 11-34 and 12-34
Dear Mr. Grant,
Enclosed are two hard copies (each) of the MWD surveys on wells 11-34 and 12-34.
Please call me at 563-3256 if you have any questions.
Sincerely,
Sandra Lufkin
Region Assistant
Enclosure.
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252
A Dresser Industries, Inc, Company
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PRUDHOE BAY DRILLING
PmU/ll-34
500292251600 ~ 0i/ ~/ JO 1994
NORTH SLOPE
COMPUTATION DATE: 11/28/94 '~a ~- -
A~Chog~,~ZR ~8~0
TRUE SUB-SEA COURS ~U ~ ~ DLS
MEASD VERTICAL VERTICAL INCLN DIRECTION
DEPTH DEPTH DEPTH DG MN DEGREES DG/100
PAGE
DATE OF SURVEY: 112394
MWD SURVEY
JOB NUMBER: AK-MW-40089
KELLY BUSHING ELEV. = 62.50
OPERATOR: ARCO ALASKA INC
FT.
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
VERT.
SECT.
0 .00 -62.50 0 0 N .00 E .00
239 239.05 176.55 0 12 S 52.00 W .08
329 329.57 267.07 0 24 S 78.90 W .26
418 418.94 356.44 0 48 N 81.70 W .50
510 510.94 448.44 1 54 N 65.30 W 1.25
.00N .00E .00
.26S .33W .15
.41S .76W .44
.38S 1.69W 1.25
.35N 3.71W 3.36
598 598.58 536.08 3 30 N 67.10 W 1.83
688 688.08 625.58 5 11 N 55.80 W 2.11
779 778.12 715.62 6 24 N 56.00 W 1.33
876 874.79 812.29 7 30 N 56.00 W 1.13
970 968.35 905.85 8 36 N 55.50 W 1.17
2.00N 7.50W 7.45
5.35N 13.39W 14.23
10.47N 20.96W 23.36
17.06N 30.73W 35.13
24.51N 41.67W 48.34
1068 1064.89 1002.39 9 18 N 57.90 W .81
1161 1156.46 1093.96 9 18 N 63.00 W .89
1256 1250.29 1187.79 10 23 N 61.50 W 1.19
1352 1344.76 1282.26 12 0 N 61.30 W 1.66
1447 1436.82 1374.32 11 41 N 63.90 W .65
32.85N 54.38W
40.24N 67.41W
47.83N 81.82W
56.79N 98.24W
65.68N 115.38W
63.53
78.50
94.77
113 .46
132.73
1542 1529.75 1467.25 13 48 N 68.50 W 2.45
1637 1621.79 1559.29 14 30 N 68.00 W .75
1731 1712.98 1650.48 16 6 N 68.00 W 1.69
1827 1804.63 1742.13 16 47 N 66.40 W .87
1923 1896.42 1833.92 17 36 N 65.30 W .90
74.10N 134.64W
82.70N 156.19W
92.04N 179.32W
102.54N 204.26W
114.17N 230.18W
153.57
176.47
201.11
227.89
256.10
2017 1985.77 1923.27 17 36 N 64.40 W .29
2111 2075.37 2012.87 18 36 N 65.00 W 1.08
2204 2163.75 2101.25 19 36 N 64.10 W 1.11
2301 2254.27 2191.77 20 30 N 64.40 W .94
2395 2342.37 2279.87 21 17 N 61.59 W 1.36
126.21N 255.84W
138.72N 282.32W
151.88N 309.95W
166.23N 339.70W
181.51N 369.66W
284.29
313.43
343.89
376.79
410.34
2490 2430.31 2367.81 24 0 N 60.60 W 2.86
2584 2514.83 2452.33 27 30 N 63.00 W 3.89
2679 2597.11 2534.61 30 47 N 65.20 W 3.68
2775 2679.44 2616.94 32 54 N 63.40 W 2.38
2872 2759.32 2696.82 34 35 N 63.60 W 1.77
199.27N 401.78W
218.48N 437.72W
238.48N 479.01W
260.68N 525.09W
284.49N 572.85W
447.01
487.72
533.41
584.34
637.54
2967 2836.60 2774.10 36 35 N 62.50 W 2.21
3061 2911.94 2849.44 37 17 N 63.40 W .94
3158 2988.20 2925.70 38 30 N 62.00 W 1.53
3253 3062.55 3000.05 39 17 N 60.80 W 1.15
3347 3135.31 3072.81 39 42 N 60.80 W .42
309.58N 622.16W
335.35N 672.64W
362.58N 725.38W
391.30N 778.05W
420.56N 830.41W
692.73
749.27
808.51
868.44
928.39
MIC[EOFILMED
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 2
PRUDHOE BAY DRILLING
PBu/11-34
500292251600
NORTH SLOPE
COMPUTATION DATE: 11/28/94
DATE OF SURVEY: 112394
MWD SURVEY
JOB NUMBER: AK-MW-40089
KELLY BUSHING ELEV. = 62.50
OPERATOR: ARCO ALASKA INC
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
3443 3208.85 3146.35
3538 3282.05 3219.55
3633 3356.58 3294.08
3730 3432.86 3370.36
3825 3507.95 3445.45
40 5 N 60.00 W .68 450.94N 883.87W
38 47 N 60.20 W 1.38 480.96N 936.08W
38 12 N 60.80 W .74 510.16N 987.68W
37 30 N 65.00 W 2.76 537.16N 1040.40W
37 42 N 65.80 W .56 561.23N 1092.98W
989.86
1050.08
1109.35
1168.44
1225.91
3921 3583.82 3521.32
3984 3633.37 3570.87
4116 3737.50 3675.00
4212 3813.23 3750.73
4306 3887.89 3825.39
38 0 N 65.50 W .37 585.54N 1146.69W
38 12 N 64.80 W .76 601.86N 1181.95W
37 47 N 66.70 W .94 635.28N 1256.11W
37 47 N 65.80 W .58 658.94N 1309.88W
37 12 N 66.40 W .75 682.15N 1362.25W
1284.46
1323 .09
1403 . 87
1462.14
1518 . 99
4403 3965.39 3902.89
4500 4041.02 3978.52
4592 4113.16 4050.66
4689 4187.89 4125.39
4785 4262.45 4199.95
37 30 N 65.80 W .48 706.11N 1416.33W
38 54 N 67.10 W 1.68 729.88N 1470.88W
39 17 N 64.40 W 1.88 753.96N 1524.32W
39 5 N 65.00 W .45 780.01N 1579.43W
39 0 N 63.70 W .86 806.18N 1633.94W
1577.68
1636.68
1694.89
1755.54
1815.75
4880 4336.17 4273.67
4974 4409.14 4346.64
5067 4481.73 4419.23
5165 4557.14 4494.64
5261 4631.96 4569.46
39 12 N 62.70 W .70 833.20N 1687.42W
39 5 N 66.90 W 2.82 858.48N 1741.13W
39 0 N 65.30 W 1.08 882.33N 1794.97W
39 5 N 66.00 W .47 907.55N 1850.70W
38 54 N 65.20 W .56 932.58N 1905.87W
1875.50
1934.56
1992.99
2053.75
2113.93
5355 4705.00 4642.50
5450 4779.51 4717.01
5546 4854.01 4791.51
5643 4929.34 4866.84
5738 5003.63 4941.13
38 54 N 65.00 W .13 957.39N 1959.33W
39 0 N 66.00 W .66 982.37N 2014.14W
39 0 N 65.20 W .53 1007.29N 2069.07W
38 47 N 65.30 W .22 1032.74N 2124.28W
38 42 N 64.40 W .60 1058.08N 2178.24W
2172.54
2232.38
2292.30
2352.72
2412.03
5833 5077.54 5015.04
5929 5152.53 5090.03
6025 5227.84 5165.34
6119 5301.32 5238.82
6215 5375.87 5313.37
38 35 N 65.00 W .41 1083.34N 2231.68W
38 17 N 64.30 W .55 1108.83N 2285.49W
38 47 N 64.40 W .52 1134.80N 2339.59W
38 54 N 63.60 W .54 1160.75N 2392.78W
38 42 N 64.60 W .69 1186.93N 2446.70W
2470.84
2530.10
2589.84
2648.81
2708.50
6311 5450.78 5388.28
6406 5524.19 5461.69
6502 5598.70 5536.20
6597 5672.66 5610.16
6691 5744.81 5682.31
38 54 N 65.00 W .33 1212.58N 2501.20W
39 5 N 65.00 W .21 1237.70N 2555.08W
39 12 N 64.60 W .28 1263.53N 2609.96W
39 12 N 64.30 W .20 1289.54N 2664.38W
40 0 N 61.60 W 2.03 1316.69N 2717.52W
2768.43
2827.55
2887.89
2947.93
3007.47
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 3
PRUDHOE BAY DRILLING
PBU/ll-34
500292251600
NORTH SLOPE
COMPUTATION DATE: 11/28/94
DATE OF SURVEY: 112394
MWD SURVEY
JOB NUMBER: AK-MW-40089
KELLY BUSHING ELEV. = 62.50
OPERATOR: ARCO ALASKA INC
FT.
TRUE SUB-SEA COURS
MEASD VERTICAL VERTICAL INCLN
DEPTH DEPTH DEPTH DG MN
6757 5795.69 5733.19
6854 5870.02 5807.52
6948 5941.84 5879.34
7046 6017.36 5954.86
7139 6089.04 6026.54
4O 5
4O 0
39 42
39 42
39 24
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
N 60.40 W 1.17 1337.42N 2754.92W
N 61.50 W .74 1367.76N 2809.54W
N 62.20 W .58 1396.04N 2862.39W
N 59.90 W 1.50 1426.39N 2917.25W
N 61.60 W 1.21 1455.31N 2968.88W
3050.21
3112.65
3172.51
3235.16
3294.32
7233 6162.03 6099.53
7327 6234.53 6172.03
7423 6308.80 6246.30
7518 6382.16 6319.66
7608 6452.75 6390.25
39 17
39 30
39 5
38 42
38 54
N 61.50 W .13 1483.82N 3021.51W
N 60.80 W .52 1512.55N 3073.66W
N 62.00 W .89 1541.65N 3127.03W
N 63.70 W 1.21 1568.67N 3179.69W
N 62.00 W 1.20 1594.56N 3230.19W
3354.11
3413.62
3474.35
3533.40
3590.02
7705 6528.21 6465.71
7799 6601.79 6539.29
7894 6676.01 6613.51
7987 6749.22 6686.72
8081 6823.27 6760.77
38 42
38 30
38 24
38 17
38 0
N 63.00 W .68 1622.58N 3284.01W
N 63.00 W .21 1649.25N 3336.34W
N 64.10 W .73 1675.49N 3389.10W
N 63.00 W .74 1701.29N 3440.96W
N 63.20 W .34 1727.61N 3492.84W
3650.58
3709.18
3767.92
3825.65
3883.67
8179 6900.24 6837.74
8273 6974.82 6912.32
8363 7046.57 6984.07
8457 7122.59 7060.09
8552 7199.03 7136.53
37 35
37 12
36 47
36 12
36 24
N 63.00 W .43 1754.62N 3546.08W
N 63.60 W .58 1780.24N 3597.02W
N 63.90 W .49 1804.16N 3645.51W
N 64.80 W .85 1828.51N 3696.21W
N 64.30 W .38 1852.64N 3746.92W
3943.22
4000.08
4053.96
4109.97
4165.85
8645 7273.98 7211.48
8740 7349.11 7286.61
8835 7423.96 7361.46
8925 7495.57 7433.07
9016 7568.45 7505.95
37 0
37 47
38 0
37 17
36 35
N 64.10 W .65 1876.95N 3797.21W
N 62.00 W 1.59 1902.99N 3848.40W
N 61.50 W .39 1930.57N 3899.73W
N 62.30 W .94 1956.59N 3948.46W
N 63.20 W .97 1981.70N 3997.19W
4221.49
4278.77
4336.98
4392.15
4446.85
9113 7645.81 7583.31
9208 7722.07 7659.57
9305 7798.68 7736.18
9398 7873.11 7810.61
9492 7949.29 7886.79
36 42
37 17
37 5
36 30
36 5
N 63.00 W .16 2007.74N 4048.52W
N 61.50 W 1.13 2034.50N 4099.38W
N 62.20 W .49 2061.93N 4150.65W
N 61.50 W .79 2088.20N 4199.74W
N 61.50 W .42 2114.90N 4248.91W
4504.25
4561.63
4619.71
4675.31
4731.22
9588 8027.51 7965.01
9666 8091.63 8029.13
9767 8174.42 8111.92
9856 8246.65 8184.15
9886 8271.16 8208.66
34 42
34 15
35 25
35 45
37 17
N 64.80 W 2.47 2140.02N 4298.48W
N 65.74 W .90 2158.44N 4338.46W
N 67.40 W 1.49 2181.34N 4391.33W
N 67.66 W .42 2201.09N 4439.10W
N 67.80 W 5.06 2207.97N 4455.90W
4786.64
4830.40
4887.50
4938.63
4956.57
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 4
PRUDHOE BAY DRILLING
PBU/ll-34
5oo2922516oo
NORTH SLOPE
COMPUTATION DATE: 11/28/94
DATE OF SURVEY: 112394
MWD SURVEY
JOB NUMBER: AK-MW-40089
KELLY BUSHING ELEV. = 62.50
OPERATOR: ARCO ALASKA INC
FT.
TRUE SUB-SEA COURS
MEASD VERTICAL VERTICAL INCLN
DEPTH DEPTH DEPTH DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
9904 8285.21 8222.71
9935 8309.79 8247.29
9966 8333.45 8270.95
9998 8356.38 8293.88
10029 8378.61 8316.11
37 54 N 68.30 W 3.80 2212.02N 4465.93W
39 30 N 68.80 W 5.18 2219.22N 4484.26W
41 30 N 67.00 W 7.44 2226.82N 4502.98W
44 0 N 65.40 W 8.73 2235.38N 4522.37W
46 47 N 61.80 W 11.99 2245.42N 4542.55W
4967.25
4986.67
5006.64
5027.66
5050.13
10061 8400.08 8337.58
10094 8421.26 8358.76
10126 8441.93 8379.43
10157 8461.01 8398.51
10188 8479.98 8417.48
48 47 N 60.00 W 7.52 2256.94N 4563.23W
49 47 N 60.00 W 3.08 2269.25N 4584.56W
51 54 N 58.00 W 7.97 2282.33N 4606.31W
52 5 N 57.80 W .82 2295.30N 4626.99W
51 47 N 58.50 W 2.04 2308.09N 4647.58W
5073.79
5098.41
5123.80
5148.20
5172.44
10217 8497.71 8435.21
10250 8518.13 8455.63
10281 8537.49 8474.99
10313 8556.95 8494.45
10344 8574.55 8512.05
51 42 N 57.30 W 3.31 2320.04N 4666.63W
51 35 N 57.90 W 1.46 2333.87N 4688.43W
51 47 N 57.00 W 2.35 2347.06N 4709.09W
53 42 N 55.60 W 6.85 2361.27N 4730.38W
56 17 N 54.60 W 8.88 2375.65N 4750.99W
5194.92
5220.73
5245.23
5270.80
5295.87
10376 8591.57 8529.07
10407 8606.87 8544.37
10436 8620.11 8557.61
10469 8632.98 8570.48
10499 8643.70 8581.20
59 17 N 52.80 W 10.53 2391.66N 4772.77W
61 47 N 52.00 W 8.34 2408.19N 4794.23W
64 48 N 51.40 W 10.34 2424.50N 4814.89W
68 24 N 50.40 W 11.46 2443.26N 4837.96W
70 35 N 50.60 W 7.21 2461.51N 4860.10W
5322.78
5349.69
5375.80
5405.25
5433.62
10531 8653.60 8591.10
10564 8663.13 8600.63
10595 8671.75 8609.25
10627 8680.76 8618.26
10657 8689.08 8626.58
73 0 N 49.70 W 8.04 2480.79N 4883.20W
73 35 N 49.30 W 2.15 2501.41N 4907.35W
73 48 N 49.30 W .65 2520.65N 4929.71W
73 41 N 49.50 W .67 2540.77N 4953.18W
74 18 N 49.10 W 2.36 2559.68N 4975.17W
5463.36
5494.67
5523.76
5554.23
5582.83
10689 869'7.61 8635.11
10721 8705.87 8643.37
10753 8714.23 8651.73
10784 8722.27 8659.77
10815 8730.24 8667.74
74 48 N 49.60 W 2.17 2579.79N 4998.59W
74 48 N 48.00 W 4.90 2599.81N 5021.46W
74 54 N 48.30 W .96 2620.42N 5044.47W
75 0 N 47.80 W 1.59 2640.40N 5066.70W
75 5 N 48.10 W .99 2660.39N 5088.86W
5613.25
5643.17
5673.50
5702.86
5732.14
10847 8738.39 8675.89
10881 8746.64 8684.14
10913 8753.83 8691.33
10942 8759.98 8697.48
10973 8766.52 8704.02
75 24 N 47.30 W 2.59 2681.23N 5111.77W
76 30 N 47.70 W 3.43 2703.51N 5136.07W
77 35 N 47.00 W 4.03 2724.69N 5159.07W
78 0 N 47.50 W 2.17 2743.98N 5179.94W
78 5 N 46.90 W 1.88 2764.99N 5202.62W
5762.52
5794.83
5825.45
5853.27
5883.54
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 5
PRUDHOE BAY DRILLING
PBU/ll-34
500292251600
NORTH SLOPE
COMPUTATION DATE: 11/28/94
DATE OF SURVEY: 112394
MWD SURVEY
JOB NUMBER: AK-MW-40089
KELLY BUSHING ELEV. = 62.50
OPERATOR: ARCO ALASKA INC
FT.
TRUE SUB-SEA COURS
MEASD VERTICAL VERTICAL INCLN
DEPTH DEPTH DEPTH DG MN
11005 8772.98 8710.48
11047 8781.48 8718.98
11076 8787.39 8724.89
11108 8793.20 8730.70
11140 8797.65 8735.15
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
78 18 N 46.80 W .70 2786.13N 5225.17W
78 11 N 45.00 W 4.23 2814.58N 5254.53W
78 35 N 44.20 W 2.99 2835.07N 5274.74W
80 35 N 45.00 W 6.68 2857.59N 5296.95W
83 18 N 46.60 W 9.83 2879.56N 5319.55W
VERT.
SECT.
5913.76
5953.57
5981.45
6012.09
6042.78
11173 8800.75 8738.25
11201 8802.67 8740.17
11234 8804.81 8742.31
11265 8806.69 8744.19
11300 8807.99 8745.49
85 48 N 46.50 W 7.67 2901.89N 5343.12W
86 18 N 44.40 W 7.74 2921.37N 5362.90W
86 18 N 44.40 W .00 2945.02N 5386.06W
86 48 N 44.40 W 1.60 2967.25N 5407.83W
89 0 N 45.60 W 7.06 2992.30N 5432.89W
6074.49
6101.48
6133.51
6163.62
6198.00
11328 8808.06 8745.56
11360 8807.28 8744.78
11395 8805.56 8743.06
11425 8803.57 8741.07
11457 8801.37 8738.87
90 41 N 47.60 W 9.48 3011.33N 5453.01W
92 5 N 48.30 W 4.91 3032.66N 5476.65W
93 35 N 48.30 W 4.33 3055.66N 5502.47W
93 54 N 48.50 W 1.19 3075.77N 5525.12W
94 0 N 48.80 W .98 3096.86N 5549.09W
6225.05
6256.31
6290.28
6320.05
6351.46
11491 8798.86 8736.36
11522 8796.43 8733.93
11553 8794.01 8731.51
11583 8791.86 8729.36
11616 8789.88 8727.38
94 30 N 48.20 W 2.30 3119.24N 5574.38W
94 30 N 48.00 W .64 3139.82N 5597.31W
94 30 N 48.10 W .32 3160.41N 5620.22W
93 35 N 47.70 W 3.24 3180.76N 5642.75W
93 11 N 45.80 W 5.82 3203.54N 5666.96W
6384.67
6414.93
6445.17
6474.96
6507.45
11647 8788.35 8725.85
11680 8787.00 8724.50
11707 8786.08 8723.58
11740 8785.04 8722.54
11773 8783.95 8721.45
92 30 N 46.50 W 3.20 3224.90N 5689.20W
92 11 N 46.30 W 1.09 3247.65N 5713.09W
91 41 N 47.90 W 6.23 3265.95N 5732.79W
91 54 N 48.20 W 1.09 3288.13N 5757.46W
91 54 N 48.00 W .61 3310.08N 5781.92W
6537.52
6569.71
6596.02
6628.59
6660.87
11805 8782.63 8720.13
11838 8781.16 8718.66
11872 8779.80 8717.30
11901 8778.63 8716.13
11932 8777.22 8714.72
92 48 N 48.80 W 3.75 3331.35N 5805.88W
92 18 N 48.00 W 2.86 3353.22N 5830.51W
92 18 N 48.90 W 2.64 3375.76N 5855.94W
92 24 N 48.00 W 3.18 3394.63N 5877.23W
92 48 N 49.60 W 5.28 3415.14N 5900.67W
6692.36
6724.74
6758.14
6786.11
6816.77
11965 8775.88 8713.38
11995 8774.99 8712.49
12027 8774.36 8711.86
12058 8774.20 8711.70
12087 8774.60 8712.10
91 54 N 48.40 W 4.58 3436.62N 5925.37W
91 24 N 50.20 W 6.10 3456.56N 5948.55W
90 54 N 50.00 W 1.72 3476.68N 5972.62W
89 41 N 48.80 W 5.37 3497.23N 5996.59W
88 41 N 48.80 W 3.52 3515.93N 6017.95W
6849.00
6879.15
6910.14
6941.27
6969.21
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 6
PRUDHOE BAY DRILLING
PBU/ll-34
500292251600
NORTH SLOPE
COMPUTATION DATE: 11/28/94
DATE OF SURVEY: 112394
MWD SURVEY
JOB NUMBER: AK-MW-40089
KELLY BUSHING ELEV. = 62.50
OPERATOR: ARCO ALASKA INC
FT.
TRUE SUB-SEA COURS
MEASD VERTICAL VERTICAL INCLN
DEPTH DEPTH DEPTH DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
12123 8775.84 8713.34 87 24
12155 8777.18 8714.68 87 48
12187 8778.15 8715.65 88 41
12220 8778.67 8716.17 89 30
12252 8778.64 8716.14 90 35
N 48.20 W 3.91 3540.17N 6045.35W 7005.18
N 48.30 W 1.29 3561.46N 6069.20W 7036.59
N 48.00 W 3.00 3582.52N 6092.71W 7067.60
N 49.20 W 4.35 3604.41N 6117.55W 7100.17
N 48.20 W 4.63 3625.60N 6141.67W 7131.76
12283 8778.34 8715.84 90 30
12315 8778.14 8715.64 90 11
12349 8778.08 8715.58 90 0
12380 8778.25 8715.75 89 24
12415 8779.08 8716.58 87 48
N 48.50 W 1.01 3646.33N 6164.98W 7162.41
N 48.20 W 1.33 3667.57N 6188.86W 7193.82
N 49.10 W 2.74 3689.80N 6214.11W 7226.91
N 48.30 W 3.18 3710.57N 6237.76W 7257.88
N 47.10 W 5.86 3733.54N 6263.00W 7291.35
12445 8780.46 8717.96 87 0
12476 8782.25 8719.75 86 24
12508 8784.12 8721.62 86 54
12540 8785.54 8723.04 88 0
12571 8786.05 8723.55 90 5
N 47.10 W 2.63 3754.20N 6285.23W 7321.05
N 47.20 W 1.96 3775.24N 6307.92W 7351.33
N 46.10 W 3.77 3797.17N 6331.15W 7382.54
N 46.60 W 3.78 3819.24N 6354.28W 7413.73
N 46.90 W 6.84 3840.47N 6376.85W 7444.02
12603 8785.52 8723.02 91 48
12634 8784.57 8722.07 91 41
12664 8783.97 8721.47 90 35
12696 8784.27 8721.77 88 18
12728 8785.34 8722.84 87 54
N 44.30 W 9.61 3863.08N 6399.94W 7475.45
N 45.10 W 2.59 3885.18N 6421.81W 7505.58
N 46.00 W 4.75 3906.14N 6443.18W 7534.70
N 45.40 W 7.60 3927.98N 6465.56W 7565.13
N 44.10 W 4.20 3950.96N 6488.34W 7596.50
12757 8786.40 8723.90 88 0 N 43.70 W 1.39
12831 8788.95 8726.45 88 0 N 43.70 W .00
3972.23N 6508.80W 7624.99
4025.00N 6559.23W 7695.40
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 7695.72 FEET
AT NORTH 58 DEG. 27 MIN. WEST AT MD = 12831
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 301.01 DEG.
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 7
PRUDHOE BAY DRILLING
PBU/ll-34
500292251600
NORTH SLOPE
COMPUTATION DATE: 11/28/94
DATE OF SURVEY: 112394
JOB NUMBER: AK-MW-40089
KELLY BUSHING ELEV. = 62.50 FT.
OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
0 .00 -62.50 .00 N .00 E
1000 997.14 934.64 26.98 N 45.25 W
2000 1969.39 1906.89 123.97 N 251.15 W
3000 2863.01 2800.51 318.63 N 639.56 W
4000 3645.81 3583.31 606.03 N 1190.80 W
.00
2.86 2.86
30.61 27.74
136.99 106.38
354.19 217.20
5000 4428.95 4366.45 864.79 N 1755.94 W
6000 5207.89 5145.39 1127.88 N 2325.13 W
7000 5981.49 5918.99 1411.45 N 2891.48 W
8000 6758.87 6696.37 1704.75 N 3447.75 W
9000 7554.82 7492.32 1977.13 N 3988.16 W
571.05 216.86
792.11 221.05
1018.51 226.40
1241.13 222.63
1445.18 204.05
10000 8357.76 8295.26 2235.94 N 4523.58 W
11000 8771.85 8709.35 2782.40 N 5221.21 W
12000 8774.89 8712.39 3459.22 N 5951.74 W
12831 8788.95 8726.45 4025.00 N 6559.23 W
1642.24 197.06
2228.15 585.91
3225.11 996.96
4042.05 816.95
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 8
PRUDHOE BAY DRILLING
PBU/ll-34
500292251600
NORTH SLOPE
COMPUTATION DATE: 11/28/94
DATE OF SURVEY: 112394
JOB NUMBER: AK-MW-40089
KELLY BUSHING ELEV. = 62.50
OPERATOR: ARCO ALASKA INC
FT.
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
0 .00 -62.50 .00 N .00 E
62 62.50 .00 .00 N .00 E
162 162.50 100.00 .09 S .12 W
262 262.50 200.00 .31 S .39 W
362 362.50 300.00 .46 S .99 W
.00
.00 .00
.00 .00
.00 .00
.00 .00
462 462.50 400.00 .27 S 2.32 W .01 .01
562 562.50 500.00 1.14 N 5.46 W .08 .06
662 662.50 600.00 4.04 N 11.46 W .31 .23
763 762.50 700.00 9.49 N 19.51 W .78 .48
863 862.50 800.00 16.16 N 29.39 W 1.49 .71
964 962.50 900.00 24.01 N 40.94 W
1066 1062.50 1000.00 32.64 N 54.05 W
1167 1162.50 1100.00 40.69 N 68.29 W
1269 1262.50 1200.00 48.90 N 83.79 W
1371 1362.50 1300.00 58.60 N 101.55 W
2.47 .97
3.70 1.23
5.03 1.33
6.56 1.53
8.59 2.04
1473 1462.50 1400.00 68.02 N 120.16 W
1576 1562.50 1500.00 77.05 N 142.12 W
1679 1662.50 1600.00 86.64 N 165.95 W
1783 1762.50 1700.00 97.44 N 192.60 W
1887 1862.50 1800.00 109.67 N 220.41 W
10.75 2.15
13.54 2.79
16.79 3.25
20.85 4.06
25.36 4.51
1992 1962.50 1900.00 123.02 N 249.18 W
2097 2062.50 2000.00 136.89 N 278.39 W
2203 2162.50 2100.00 151.68 N 309.55 W
2310 2262.50 2200.00 167.56 N 342.48 W
2417 2362.50 2300.00 185.33 N 376.68 W
30.27 4.91
35.37 5.10
41.15 5.78
47.63 6.48
54.81 7.18
2526 2462.50 2400.00 206.42 N 414.74 W
2639 2562.50 2500.00 229.93 N 460.88 W
2755 2662.50 2600.00 255.77 N 515.29 W
2875 2762.50 2700.00 285.47 N 574.82 W
2999 2862.50 2800.00 318.46 N 639.23 W
63.88 9.08
76.52 12.64
93.29 16.76
113.41 20.12
136.86 23.46
3125 2962.50 2900.00 352.98 N 707.33 W
3253 3062.50 3000.00 391.28 N 778.01 W
3383 3162.50 3100.00 431.58 N 850.11 W
3513 3262.50 3200.00 473.15 N 922.44 W
3641 3362.50 3300.00 512.41 N 991.75 W
162.69 25.82
191.00 28.31
220.70 29.70
250.94 30.23
278.79 27.85
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 9
PRUDHOE BAY DRILLING
DBU/ll-34
500292251600
NORTH SLOPE
COMPUTATION DATE: 11/28/94
INTERPOLATED VALUES
FOR EVEN 100
DATE OF SURVEY: 112394
JOB NUMBER: AK-MW-40089
KELLY BUSHING ELEV. = 62.50 FT.
OPERATOR: ARCO ALASKA INC
FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
3767 3462.50 3400.00
3894 3562.50 3500.00
4021 3662.50 3600.00
4147 3762 . 50 3700 . 00
4274 3862.50 3800.00
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
546.76 N 1061.02 W
578.63 N 1131.54 W
611.62 N 1202.69 W
642.95 N 1273.92 W
674.43 N 1344.59 W
MD-TVD VERTICAL
DIFFERENCE CORRECTION
305.21 26.42
331.65 26.44
358.74 27.09
385.45 26.71
411.89 26.44
4400 3962.50 3900.00
4527 4062.50 4000.00
4656 4162.50 4100.00
4785 4262.50 4200.00
4914 4362.50 4300.00
705.20 N 1414.30 W
736.62 N 1486.85 W
771.28 N 1560.72 W
806.20 N 1633 .98 W
842.76 N 1706.61 W
437.61 25.72
465.10 27.49
494.18 29.07
522.97 28.79
551.86 28.89
5043 4462.50 4400.00
5171 4562.50 4500.00
5300 4662.50 4600.00
5429 4762.50 4700.00
5557 4862.50 4800.00
875.82 N 1780.82 W
909.32 N 1854.68 W
942.92 N 1928.24 W
976.77 N 2001.55 W
1010.17 N 2075.31 W
580.70 28.84
609.46 28.75
638.07 28.61
666.60 28.53
695.28 28.68
5686 4962.50 4900.00
5814 5062.50 5000.00
5942 5162.50 5100.00
6070 5262.50 5200.00
6198 5362.50 5300.00
1043.90 N 2148.48 W
1078.26 N 2220.80 W
1112.24 N 2292.59 W
1146.88 N 2364.71 W
1182.34 N 2437.02 W
723.69 28.42
751.80 28.11
779.50 27.70
807.57 28.07
835.97 28.40
6326 5462.50 5400.00
6455 5562.50 5500.00
6584 5662.50 5600.00
6714 5762.50 5700.00
6845 5862.50 5800.00
1216.57 N 2509.77 W
1250.88 N 2583.29 W
1285.95 N 2656.91 W
1323.75 N 2730.58 W
1364.75 N 2804.00 W
864.28 28.31
893.06 28.77
922.09 29.04
951.94 29.84
982.60 30.66
6975 5962.50 5900.00
7105 6062.50 6000.00
7234 6162.50 6100.00
7364 6262.50 6200.00
7492 6362.50 6300.00
1404.04 N 2877.57 W
1444.94 N 2949.71 W
1484.00 N 3021.84 W
1523.79 N 3093.79 W
1561.69 N 3165.58 W
1012.82 30.22
1042.74 29.92
1072.08 29.34
1101.54 29.46
1130.34 28.81
7621 6462.50 6400.00
7749 6562.50 6500.00
7877 6662.50 6600.00
8004 6762.50 6700.00
8131 6862.50 6800.00
1598.26 N 3237.14 W
1635.04 N 3308.47 W
1670.82 N 3379.47 W
1706.05 N 3450.30 W
1741.42 N 3520.14 W
1158.64 28.30
1186.86 28.22
1214.62 27.75
1242.13 27.51
1269.13 27.00
SPERRY-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 10
PRUDHOE BAY DRILLING
PBU/ll-34
500292251600
NORTH SLOPE
COMPUTATION DATE: 11/28/94
DATE OF SURVEY: 112394
JOB NUMBER: AK-MW-40089
KELLY BUSHING ELEV. = 62.50 FT.
OPERATOR: ARCO ALASKA INC
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
8257 6962.50 6900.00 1776.08 N 3588.64 W 1295.20 26.07
8382 7062.50 7000.00 1809.40 N 3656.21 W 1320.40 25.20
8507 7162.50 7100.00 1840.98 N 3722.65 W 1344.55 24.15
8631 7262.50 7200.00 1873.17 N 3789.43 W 1369.03 24.48
8757 7362.50 7300.00 1907.87 N 3857.57 W 1394.93 25.90
8884 7462.50 7400.00 1944.88 N 3926.15 W 1421.71 26.78
9009 7562.50 7500.00 1979.70 N 3993.25 W 1447.07 25.36
9134 7662.50 7600.00 2013.39 N 4059.61 W 1471.72 24.65
9259 7762.50 7700.00 2049.17 N 4126.44 W 1497.21 25.49
9384 7862.50 7800.00 2084.45 N 4192.84 W 1522.33 25.12
9508 7962.50 7900.00 2119.50 N 4257.38 W 1546.40 24.07
9631 8062.50 8000.00 2150.25 N 4320.37 W 1568.54 22.14
9752 8162.50 8100.00 2178.08 N 4383.50 W 1590.05 21.50
9875 8262.50 8200.00 2205.51 N 4449.87 W 1613.16 23.12
10006 8362.50 8300.00 2238.02 N 4527.85 W 1644.21 31.05
10160 8462.50 8400.00 2296.32 N 4628.62 W 1697.84 53.63
10323 8562.50 8500.00 2365.66 N 4736.74 W 1760.66 62.81
10562 8662.50 8600.00 2500.03 N 4905.73 W 1900.01 139.36
10954 8762.50 8700.00 2752.02 N 5188.69 W 2192.02 292.01
10980 8767.76 8705.26 2769.01 N 5206.92 W 2212.24 20.21
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 22 November 1994
RE:
Transmittal of Data
Sent by: MAIL
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL # DESCRIPTION
ECC No.
Please sign and return to:~lrelin5600 B ~ete Services
MEMORANDUM
TO:
THRU'
'David Johns~~
Chairma~"'.,,~
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: November 9, 1994
Blair Wondzeil, .,~~
P. I. Supervisor
FROM' Bobby Fos~ SUBJECT:
Petroleum Inspector
FILE NO: AFRIJIBD.doc
BOPE Test- Nabors 28E
ARCO - PBU - DS 11-34
PTD # 94-138
Prudhoe Bay Field
Wednesday, November 9, 1..994: I traveled this date to ARCO's PBU DS 11- 34
being drilled by Nabors rig 28-E and witnessed the BOPE test.
As the attached AOGCC BOPE Test Report shows there were 2 failures, both were
APl ring failures. Both of these leaks were repaired and retested OK.
The location was clean and all excess drilling equipment was stored properly. The
rig was clean and all of the equipment seemed to be in good working order.
NOTE: While witnessing the BOPE test I noticed that the conductor pipe had
dropped down hole approximately 1 foot. I ask the ARCO rep., John Rail and the
Nabors toolpusher, Mike Downey, when this occured. Both of them said they didn't
know. They both had noticed that it had dropped,, but said that it must have occured
on the other shift. -r'/~,:r ~ ~, ~,[e ~o~f,,,-'~,~,,.
Summary: I witnessed the BOPE test on Nabors rig 28E - test time 5 hours - 2
failures.
Attachment: AFRIJIBD.XLS
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
OPERATION: Drlg: X
Drlg Contractor:
Operator:
Well Name:
Casing Size: 10 3/4
Test: Initial X
Workover:
NABORS Rig No. 28E PTD #
ARCO Rep.:
DSf 1-34 Rig Rep.:
Set @ 4052' Location: Sec.
Weekly Other
DATE: 11/9/94
94-138 Rig Ph.# 659-4863
JOHN RALL
MIKE DOWNEY
33 T. 11N R. 15E Meridian UM
MISC. INSPECTIONS:
Location Gen.: OK
Housekeeping: OK (Gen)
Reserve Pit N/A
Well Sign OK
Drl. Rig OK
BOP STACK:
Annular Preventer
Pipe Rams
Lower Pipe Rams
Blind Rams
Choke Ln. Valves
HCR Valves
Kill Line Valves
Check Valve
Test
Quan. Pressure P/F
1 300/3,000 P
1 500/5,000 P
1 500/5,000 P
1 500/5,000 P
1 500/5,000 P
2 500/5,000 P
1 500/5,000 P
N/A
MUD SYSTEM: Visual Alarm
Tdp Tank YES NO
Pit Level Indicators YES OK
Flow Indicator YES OK
Meth Gas Detector YES OK
H2S Gas Detector YES OK
FLOOR SAFETY VALVES'
Upper Kelly / IBOP
Lower Kelly / IBOP
Ball Type
Inside BOP
Test
Quan. Pressure P/F
I 500/5,000 P
I 500/5,000 P
I 500/5,000 P
f 500/5,000 P
CHOKE MANIFOLD:
No. Valves 18
No. Flanges
Manual Chokes
Hydraulic Chokes I
Test
Pressure PIF
500/5,000 P
48 500/5,000 P
2 P
Functioned
Functioned
ACCUMULATOR SYSTEM:
System Pressure
Pressure After Closure
200 psi Attained After Closure 0
System Pressure Attained 2
Blind Switch Covers: Master:
Nitgn. Btl's: 8 @ 2000
3,000 P
minutes 25 sec.
minutes 0 sec.
YES Remote: YES
Psig.
26 Repair or Replacement of Failed
Number of Failures:
2 ,Test Time: 5.0 Hours. Number of valves tested
Equipment will be made within 0 days. Notify the Inspector and follow with Written or Faxed verification to
the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687
If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433
REMARKS:
FAILURE: The AP! ring between the blind rams and the lower pipe rams leaked - tightened and tested
OK - The APl ring on the choke line leaked - changed out and retested OK
Distribution:
orig-Well File
c - Oper./Rig
c- Database
c - Trip Rpt File
c -Inspector
STATE WITNESS REQUIRED?
YES X NO
24 HOUR NOTICE GIVEN
YES X NO
Waived By:
Witnessed By:
BOBBY D. FOSTER
FI-02t L (Rev. 7/t9) AFRIJIBD.XLS
ALASKA OIL AND GAS
CONSERVATION COMMISSION
October 24, 1994
.WALTER J. HICKEL, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 9950 I-3192
PHONE: (907)279-1433
TELECOPY: (907)276-7542
Terry Jordan
Drilling Engineer Supervisor
ARCO Alaska, Inc.
P O Box 196612
Anchorage, AK 99519-6612
Re:
Prudhoe Bay Unit DS 11-34
ARCO Alaska, Inc.
Permit No: 94-138
Sur. Loc. 4831'NSL, 40'WEL, Sec. 33, TllN, R15E, UM
Btmhole Loc. 1962'SNL, 1026'WEL, Sec. 29, TllN, R15E, UM
Dear Mr. Jordan:
Enclosed is the approved application for permit to drill the above
referenced well.
The permit to drill does not exempt you from obtaining additional
permits required by law from other governmental agencies, and does not
authorize conducting drilling operations until all other required
permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with
20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE
test performed before drilling below the surface casing shoe must be
given so that a representative of the Commission may witness the test.
Notice may be given by contacting the Commission petroleum field
inspector on the North Slope pager at 659-3607.
·
C~airman ~)
BY ORDER OF THE CO ISSION
dlf/Enclosures
cc:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work Drill [] Redrill I-II lb. Type of well. Exploratory[] Stratigraphic Test [] Development Oil []
Re-Entry [] DeepenFII Service [] Development Gas [] Single Zone [] Multiple Zone[]
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
ARCO Alaska, Inc. KBE = 63.8 feet Prudhoe Bay Fie/d/Prudhoe
3. Address 6. Property Designation Bay Pool
P. O. Box 196612. Anchoraae. Alaska 99519-6612 ADL 28326
4. Location of well at surface 7. Unit or property Name 11. Type Bond(s.e 2o AAc 25.025)
4831' NSL, 40' WEL, SEC. 33, T11N, R15E Prudhoe Bay Unit
At top of productive interval 8. Well number Number
2496' SNL, 500' WEL, SEC. 29, T11N, R15E 11-34 U-630610
At total depth 9. Approximate spud date Amount
1962' SNL, 1026' WEL, SEC. 29, T11N, R15E 10/28/94 $200,000.00
12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
property line
ADL 28325-1026' feet No close approach feet 2560 12436' MD/8784' TVD feet
16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2))
Kickoff depth 400 feet Maximum hole angle 94 o Maximum surface 3330 psig At total depth (TVD) ~800'/4390 psiD
18. Casing program Specifications Setting Depth
s~ze Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length M D TVD MD TVD (include stage data)
30" 20" 91.5# H-40 Weld 75' 35' 35' 110' 110' 260 sx Arcticset (Approx.)
13-1/2" 10-3/4" 45.5# NT-80 B TC 4039' 34' 34' 4074' 3690' 1345 sx CS lll/375 sx "G'Y250 sx CS II
9-7/8" 7-5/8" 29.7# L-80 NSCC 9665' 33' 33' 9700' 8061'
9-7/8" 7-5/8" 29. 7# 13CR80 NSCC 1987' 9 700' 8061' 11687' 8794' 970 sx Class "G"
6-3/4" 4-1/2" 12.6# 13CR80 NSCT 900' 11536' 8802' 12436' 8784' Uncemented Slotted Liner
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented Measured depth True Vertical depth
Structural
ConductorRECEIVED
Surface
I nte rmedi ate
Production 0C~ ~ oj ~994
Liner Ai~Sk~ 0[1 & Gas Cons. Commission
Perforation depth: measured /~ch0rage
true vertical
'20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program ITl
Drilling fluid program [] Time vs depth pict [] Refraction analysis[] Seabed report[] 20 AAC 25.050 requirementsl-I
/-~v Signed ,/~ Title Drilling Engineer Supervisor Date /~ -/~- ~ ~
Commission Use Only
Permit Number IAPI number IAppr~oval d_.ate. ~ ISee cover letter
/~-~,'~ 150' 0~----~''- ~---' ~---",--~'--""~'J z,/~/~ - o¢',,~'--7~1~' for other requirements
ConditiOns of approval Samples required [] Yes ~1~ No Mud Icg required []Yes ]~ No
Hydrogen sulfide measures [] Yes ~ No Directional survey required ,J~ Yes [] NO
Required working pressure for BOPE []2M; 1-13M; I~M; I-I10M; [-115M;
Other: Original Signed By by order of
Approved by r)avid W. Johnston Commissioner ~ne commmsion Date/o/'z.£//,Fy
Form 10-401 Rev. 12-1-85 Submit )licate
]Well Name: IDSll-34 PBU
Well Plan Summary
I Type of Well (producer or injector): I Producer
ISurface Location:
Target Location:
Bottom Hole Location:
4831' FSL 40' FEL Sec 33 TllN R15E UM
2496' FNL 500' FEL Sec 29 T11N R15E UM
1962' FNL 1026' FEL Sec 29 TI IN R15E UM
[ AFE Number: 14J0271 I
Estimated Start Date: I 10-28-94
IMD: I 12436'
I Rig: I Nabors 28-E
I I Operating days to complete: 125
ITVD: 187~4' I IRT'GL 135-2'
IKBE:1 63.8'
! Well Design (conventional, slimhole, etc.):
I Slimhole Longstring Horizontal
I
I
Formation Markers:
Formation Tops MD TVD (BKB)
Base Permafrost 1886' 1864'
..Ugnu 4A (K-15) 5614' 4904'
Top Ugnu 6705' 5764' Top of Cretaceous Injection Interval
Base Ugnu 8101' 6864' Btm of Cretaceous Injection Interval
K-10 8977' 7554'
K-5 9269' 7784'
LCU/Sag River 9916' 8294 Oil/Gas
Top Shublik 9921' 8298'
Top Sadlerochit 9997' 8358'
Zone 4B 9997' 8358'
"~;one 4A 10089' 8426'
Zone 3 10170' 8479'
Zone 2/2C 10288' 8553'
Zone 2B Tango 10375' 8605'
Zone 2A Romeo 10608' 8699'
Zone 1 L. Romeo 10823' 8744' Present Gas/Oil Contact
Base Sadlerochit 11448' 8804'
_Target 11686' 8794' Begin Slotted Liner
Total Depth 12436' 8784' End Slotted Liner
Casing/Tubing Program:
Well Plan Summary
RECEIVED
OC'T I 9 1994
Gas Cons. Commission
Anchora[~¢
Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm
Tbg O.D. MD/TVD MD/TVD
30" 20" 91.5# H-40 Weld 80' 35'/35' 110'/110'
13-1/2" 10-3/4" 45.5# NT80 BTC 4039' 34'/34' 4074'/3690'
9-7/8" 7-5/8" 29.7# L-80 NSCC 9665' 33'/33' 9700'/8061'
9-7/8" 7-5/8" 29.7# 13Cr-80 NSCC 1987' 9700'/8061' 11687'/8794'
6-3/4" 4-1/2" 12.6g 13Cr-80 NSCT 900' 11536'/8802' 12436'/8784'
Tubing
4-1/2" 12.6g 13Cr-80 NSCT 9965' 32'/32' 10000'/8359'
Logging Prog
I Open Hole Logs:
13-1/2" Hole
9-7/8" Hole
6-3/4" Hole
I Cased Hole Logs:
7-5/8" Casing
ram ·
No Wireline Logging. Openhole logs by MWD.
None
MWD: GR/Dir/4-Phase Resisitivity/Density/Neutron 11,586-11,248'
MWD: GR/Dir in horizontal section
None
Mud Program:
I Special design considerations I Xanvis KCL system in 6-3/4" horizontal section
Surface Mud Properties: I 13-1/2" hole section: SPUD
Density Marsh Yield 10 sec 10 rain pH Fluid
(PPG) Viscosity Point gel gel Loss
8.5 100 20 15 20 9 15
tO tO tO tO tO tO tO
9.5 300 60 60 80 10 25
Intermediate Mud Properties: 1 9-7/8" hole section: LSND
Density Marsh Yield 10 sec 10 rain pH Fluid
(PPG) Viscosity Point gel gel Loss
9.0 35 10 5 10 9.5 5
to to to to to to to
10.0 50 15 10 20 10 10
Production Mud Properties: I 6-3/4" hole section: Xanvis KCL
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
8.8 10 15 5 30 8 <6
to to to to to to to
9.2 30 20 10 50 9 <6
Directional:
I KOP: 1400'
Well Plan Summary
RECEIVED
I
OCT 1.9 1B94
Alaska Oil & Gas Cons. Commission
Anchora[:,~
I Maximum Hole Angle: 1 94 de~rees
Close Approach Well: None
The above listed wells will be secured during the close approach.
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer
will be installed and is capable of handling maximum potential surface pressures.
Diverter, BOPE and drilling fluid system schematics on file with AOGCC.
PROPOSED DRILLING AND COMPLETION PROGRAM
WELL D$11-34 PB[J
1. MIRU. NU diverter and function test same.
2. Drill 13-1/2" hole. Run and cement 10-3/4", 45.5#, NT-80 Buttress casing to surface.
o
Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams,
and annular preventer. Function test BOPE to 5000/250 psi.
.
Test 10-3/4" casing to 3000 psi for 30 minutes. A formation leak-off test will be
performed 10' below the 10-3/4" shoe.
.
Directionally drill 9-7/8" hole & tag Kavik (base Sadlerochit) building to horizontal
target in Lower Romeo @ 11,686' MD/8794' TVD. TIH w/9-7/8" hole opener w/MWD
tools (GR/4-phase Resistivity/Density/Neutron). Cleanout and log from 200' above
Sadlerochit to casing point. Run 7-5/8", 29.7#, L-80, NSCC by 7-5/8", 29.7#, 13Cr-80
NSCC casing string (space top of chrome casing 300' MD above Sadlerochit) and cement
with Class G cement to 300' MD above Cretaceous. The annulus will be freeze protected
with dry crude. Test casing to 3500 psi.
.
TIH w/6-3/4" BHA PU 3-1/2" DP. Drill 10' of new hole and displace to Xanvis KCL
mud system. Directionally drill the 6-3/4" horizontal hole to TD. RIH w/6-3/4"
holeopener and 7-5/8" scraper spaced in the 7-5/8" casing. Circulate horizontal section
clean.
.
Run 4-1/2", 12.6g, 13 Cr-80 NSCT slotted liner with horizontal packer. Liner will be set
at TD and lapped 150' inside 7-5/8" casing shoe. Release from packer and displace
Xanvis mud with f'fltered seawater. Spot lithium hypochlorite breaker in liner.
7. POH LDDP.
o
Run 4-1/2" 13Cr tubing with SSSV, GLM's, and 7-5/8" x 4-1/2" hydraulic permanent
packer. Displace well with filtered seawater and corrosion inhibitor. Set packer and test
tubing annulus w/3500 psi.
9. Set BPV. ND BOPE.
10.
Freeze protect well to 2100' TVD through shear valve in top GLM station. Release rig.
RECEIVED
Well Plan Summary
OCT 19 199'~
A!~ska Oil & Gas Cons. Commission
gnch0ra[.,,~
CASING SIZE: 10-3/4"
10-3/4" SURFACE CASING
CEMENT PROGRAM - BJ SERVICES
CIRC. TEMP: 40°F
PREFLUSH: 75 bbls fresh water ahead of lead slurry.
LEAD CEMENT TYPE: COLD SET III
ADDITIVES: retarder
WEIGHT: 12.2ppg YIELD: 1.92ft3/sx MIX WATER: 10.53 gps
APPROX. # SACKS: 1345 THICKENING TIME: > 4 hrs
TAIL CEMENT TYPE: CLASS G
ADDITIVES' 2% A-7 + 1.0 ghs FP-6L
WEIGHT: 15.8ppg YIELD: 1.15ft3/sx
APPROX. # SACKS: 375
MIX WATER: 4.95 gps
THICKENING TIME: > 3-1/2 hrs
TOP JOB CEMENT TYPE: COLD SET II
ADDITIVES:
WEIGHT: 14.95 ppg
YIELD- 0.96 ft3/sx
MIX WATER: 3.89 gps
APPROX. # SACKS' 250 THICKENING TIME: Greater than 2 hrs @ 50°F
CENTRALIZER PLACEMENT:
1. Run 1 bow type centralizer per joint for the first 15 joints.
2. Place the centralizers in the middle of each joint with a stop collar.
CEMENT VOLUME:
1. Lead slurry from TD to surface w/100% excess (less the tail slurry volume).
2. Tail slurry volume 375 sx (to cover 500' of casing shoe w/100% excess).
3. Top job volume 250 sx.
Well Plan Summary
RECEIVED
OCT' 19 1994
Anchora.~
7-5/8" CASING
CEMENT PROGRAM - BJ SERVICES
CASING SIZE: 7-5/8" CIRC. TEMP: 140°F
PREFLUSH: 20 bbls fresh water
SPACER: 70 bbls BJ MCS-4 Spacer weighted 1.0 ppg above mud weight.
LEAD CEMENT TYPE: CLASS G
ADDITIVES: 3% A-2 + 0.4% FL-52 + 0.5% CD-32 + 0.5 ghs FP-12L
WEIGHT: 11.0 ppg
APPROX. # SACKS' 300
FLUID LOSS' N/A
YIELD: 3.31 ft3/sx
MIX WATER: 20.92 gps
THICKENING TIME: >5 hrs
FREE WATER: 0 cc
TAIL CEMENT TYPE: CLASS G
ADDITIVES: 150 ghs BA-86L + 0.2% FL-33 + 0.6% CD-32 + 0.2% A-2 + 0.5% gel + 1.0 ghs
FP-6L
WEIGHT: 15.7 ppg
APPROX. # SACKS: 670
FLUID LOSS: < 50 cc/30 minutes
YIELD: 1.17 ft3/sx
MIX WATER: 5.08 gps
THICKENING TIME: 3-1/2 to 4-1/2 hrs
FREE WATER: 0 cc
CENTRALIZER PLACEMENT:
1. Run 2 Turbulators per joint f/TD to 300' MD above top of Sadlerochit.
2. Run 1 straight blade rigid centralizer every joint 300' above and below the Cretaceous
interval.
OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacer/mud program and
ensure compatibility prior to pumping job. Ensure thickening times are adequate relative to
pumping job requirement. Displace at 12 bpm. Mix lead slurry on the fly, batch mix the tail
slurry.
CEMENT VOLUME:
1. Lead slurry to 300' MD above Cretaceous (top of Cretaceous @ 6705' MD)
2. Tail slurry to 8997' MD (1000' above TSAD)
3. 80' MD 7-5/8", 29.7# capacity for float joints.
RECEIVED
Well Plan Summary
OCT '1 9 1994
Oil & Gas Cons, Comr~ission
Anchor~.~: :~
. ,
HALL IBURTDN
3DD~--
7794 ~
gO00 --
CRiTiCal. PDI~q' /~ATA
TiE IN 0 O, 00' 297.00' 0 0 N 0
KOP / ~T~T 400 O.O0' R97.00' 400 0 N 0
DF BUI~ R
~TA~T O~ ~di~ 1000 6.~0' ~7.00' 999
~ 1 ,~O*/lO0
~T ~ 14001E.OO'~7,00' 1~94 43 N
~. 00'/100 ~
~ ~ C~ IBO0~0.00' ~. 00' 177B
START OF 2100~0.00' ~5,00' ~060 137 N
~ ~ ~ 300~3~.00' ~97.00' ~844 33~ N 663
T- 5 40863S.00' ~e?.O0' ~?00
K - Z~ 5614 38.00'~7.00' 490~ 10~8 N 8097
K - lO 89~ 39. DO'~97.00' 7~4 EO0~ N 3~R
K - ~ 9R69 ~.00' ~7.00' ~7~4 E084 N 410R
~U~LIK ~1 38.00' ~gT. 00' B~B
ST~T D? ~B~ 38.00' Eg?. 00' 8350 ~Bq N 44~
B, 00'/100 ~
~P S~ / ~ 38.77' ~97,30' 8~ ~87 N 4~01
IYI~ / ~
4~ / Z~U
~NE 4A / lOO~ 45,97' E99.67' B4~& a317 N 4~6
~ Dr ~YE 10154 51.00'301.00' 8468 ~41 N 4597
ZONE 3 10170 51,00'SOt.O0' 8479
~ a / ~ loaee ~I.00'301,00' O~
~TART DF 10~ ~.00' 30L.O0' ~60 E399 N 469q
~VE e
ZON~ ~ / 1~75 56.9~* 30~.63' B605 E43E N 4747
T~
~ ~ / 1060~ ~.E4' 306.56' 9699
EN~ OF ~YE 10645 ?B.I&'307.10' 9707 E574 N 4950
ZO~ lB / lOBE3 78.16*307,1D* 6744 E679 N 5088
L~ RD~
START 0~ IIOBB 78.16'307.10' 87~8 2835 N 5895
B. 00'/100 ~t
LIN~P PDI~ /llE40 ~0.00' 310,00' BB14
~VIK
~ ~ ~RYE 1144B 94.17'313,09' egO6 3067N 5568
ST~T ~r I1~1 ~q.17' 313.09' ggO~ 3~17N56E2
~VE ~
E.50'/lO0 F~
~9 DF ~ 1168690.76' 31~.4~' B794 3E33N5740
E~ i~43690,76' 315.46' 87~4 3767N6~66
500 10 0 t ~DOD ~ 0(~~1000:~*Og40~0 4500 500~ ~0~ 6000 G~ 7000 750g BgOD
) } G~l~ POINT ~TA
, 1~ ~/~ ~n 407~ ~.oo- ~7.00' 3690
~ j ~/~ m~ Ll~6 90.76' 31~,4G' B7~ ~3~ N 5~40 V J
RECEIVED
OC'I~ 1 9 1994
A!~ska Oil & Gas Cons. Commission
Anchork, ~
Ol/~'d f)Wi-]]i~5 HO!~J~q~iqqUH UHS~-i'.,d_ WUZE:g_a P-6, Si lDO
~ Bay Drilhng
~noe Bay Unit
.rill Site 11
11-34 AS-BDILT
!!-34 %~p8 PRELIMLN.~Y KELI~LAN
CRITICAL PDINT DATa
MI;
TIE IN 0 O,OC'
KD? / ~TA,RT ~00
Dr BUILD E
~TART Dr ~UI~ 100~ 6.00' E97.00'
: START ~ i4OO lR. 00' E97.
E.OC'/IO0 ~
~ DF ~YE 300:3~, DO'
K-tS ~ 3~.OO' ~37.OO'
K-10 ~77 38.00'
K-5 ~69 ~.00' ~97.00'
L~ / IVI~HAK 9~163~ . OD' ~7.
~U~LIK 9~1 3~.00'EF7.00'
START ~' 996736.00'E97,00'
~YE E
~VI~K /
Z~: 4A / ~OOBg 45,g7'
X~AY
~ Or ~g~ 1Oi~ Sl. O0' 301.00'
~ON~ ~ 1017051.00'301,00'
~TART DF 10~ 51.00'301.00'
~N~ E~ / 103~ 56.95'302.~3'
~ or ~YK 10S4579.15'3~7,10'
LD%~ ~
START Dr llO~;7g.l&'307.10'
E. 00'/100 ~
~T&~T ~m
KAYIK
~T~T D~ ll~i 9~,I7'
CUR~ ~
~D ~ ~YE Ll~6 90,76' 3:5,46'
a.z~. T~ N/S E/V
~gT.O0' 0 C N 0 K
E97.00' 400 0 N 0 E
999 14 N EB V
R050 I37 N ET~
E844 33~ N 663
490~- ~06~ N E097
T7B4 E094 N 410~
B~94 ~.264 N 4457
8E98 E~68 N 4460
8350 ?.E84 N %496
13358 ~B7 N 450[
8469 E341N 4597
647~ E34B N 460B
~553 ~S N4&G7
$$60 L::"'J~ N46r'~·
6605 ~43R N 4747
8699 E55'3 N 49[[
6707 ['574 ~ 4950
8744 ~679 N 50B~
8798 R_~35 N~95
8~14 E93~ N 54i3
3767 N 6F,66 ¥
e785.~G
37ee.~8 N
696e.00 T
RECEIVED
(')CT 1 9 1994
~ska 0il & Gas Cons. Commission
Anchon,, ~
OI/g 'd
WELL PERMIT CHECKLIST
COMPANY . ,/~(~ ,~
EOL
//-,3
UNIT#
PROGRAM: exp [] dev~ redrll [] serv []
o. oFF
ADMINISTRATION
1. Permit fee attached ..................
2. Lease number appropriate ...............
3. Unique well name and number ..............
4. Well located in a defined pool .............
5. Well located proper distance from drlg unit boundary.
6. Well located proper distance from other wells .....
'7. Sufficient acreage available in drilling unit .....
8. If deviated, is wellbore plat included ........
9. Operator only affected party .............
10. Operator has appropriate bond in force ........
11. Permit can be issued without conservation order ....
12. Permit can be issued without administrative approval.
13. Can permit be approved before 15-day wait .......
ENGINEERING
14. Conductor string provided ...............
15. Surface casing protects all known USDWs ........
16. CMT vol adequate to circulate on conductor & surf csg.
17. CMT vol adequate to tie-in long string to surf csg . .
18. CMT will cover all known productive horizons .......
19. Casing designs adequate for C, T, B & permafrost ....
20. Adequate tankage or reserve pit .............
21. If a re-drill, has a 10-403 for abndnmnt been approved.
22. Adequate wellbore separation proposed ..........
23. If diverter required, is it adequate ..........
24. Drilling fluid program schematic & equip list adequate
25. BOPEs adequate .....................
26. BOPE press rating adequate; test to ~ psig.~
27. Choke manifold complies w/API RP-53 (May 84) .......
28. Work will occur without operation shutdown .......
29. Is presence of ~2s gas probable .............
GEOLOGY
APPR DA
30. Permit can be issued w/o hydrogen sulfide measures .... Y
31. Data presented on potential overpressure zones ..... Y /~
32. Seismic analysis 9f shallow gas zones .......... V N
33. Seabed condition survey (if off-shore) ........
34. Contact name/phone for weekly progress reports . .
[exploratory only]
GEOLOGY:
ENGINEERIN~: COMMISSION:
TAB .~._
Comments/Instructions:
OW/jo - A:M::ORMSk:heklist rev 03/94
·
0
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
l;ape ~Subfile 2 is type: LIS
TAPE HEADER
PRUDHOE BAY UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 7
6707.00
R. JACKSON
J. RALLS
D.S. 11-34
500292251600
ARCO ALASKA INC.
SPERRY-SUN DRILLING SERVICES
Il-JUL-96
MWD RUN 8
R. JACKSON
J. RALLS
MWD RUN 9
R. JACKSON
J. RALLS
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 10
R. JACKSON
J. RALLS
MWD RUN 11
R. JACKSON
J. RALLS
MWD RUN 12
R. JACKSON
J. RALLS
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 13
WORTHINGTON
J. CARLILE
MWD RUN 14
WORTHINGTON
J. CARLILE
MWD RUN 15
WORTHINGTON
J. CARLILE
MWD RUN 16
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
R. JACKSON
J. CARLILE
33
liN
15E
4831
4O
62.50
61.00
28.50
MICROFILMED
_ _ ....
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING
2ND STRING 13.500 10.750 4048.0
3RD STRING 9.875 7.625 11282.0
PRODUCTION STRING 6.750 4.500 12831.0
REMARKS:
RECEIVED
MWD - GR.
ALL DEPTHS ARE MEASURED BIT DEPTHS.
6.75" DGWD GAMMA RAY WAS NOT STARTED UNTILL RUN #7 AT
9882' (DEPTH OF GAMMA RAY START).
4.75" DGWD GAMMA RAY LOGGED 6.75" HOLE FROM 11306 - TD.
A PRE/POST GAMMA RAY SAMPLE WAS TAKEN PRIOR TO DIS-
PLACEMENT TO FLO-PRO.
PRE AVG OF 10 SAMPLES = 29.6 AAPI
POST AVG OF 10 SAMPLES = 36.9 AAPI
TD OF WELL IS 12831'.
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves;
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
GR 9874.0
$
BASELINE CURVE FOR SHIFTS: GR
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH GR
9874.5 9882.0
9878.0 9884.5
9892.5 9901.0
9899.0 9908.5
9923.0 9930.0
9940.0 9947.0
9950.5 9957.0
9956.0 9963.0
9968.0 9975.0
9970.0 9977.0
9984.0 9991.0
9989.0 9995.0
10010.0 10015.0
10013.5 10019.0
10025.5 10032.5
10030.0 10038.5
10056.0 10062.0
10060.5 10066.5
10079.0 10085.0
10142.0 10148.0
10149.0 10155.0
10173.5 10179.5
10190.0 10195.0
10202.5 10207.0
10213.0 10222.0
10231.0 10238.0
10240.5 10250.0
10248.5 10257.0
10292.0 10296.5
10468.5 10473.5
10471.5 10476.0
10474.5 10481.0
10488.0 10492.0
10501.0 10507.5
10514.5 10519.5
10526.5 10532.0
10545.5 10554.0
10595.0 10603.0
10616.0 10623.5
10621.0 10630.0
10641.0 10650.5
10654.5 10660.0
10694.0 10697.5
10746.5 10749.5
all bit runs merged.
STOP DEPTH
12749.0
(WALS open hole, 14-NOV-94)
EQUIVALENT UNSHIFTED DEPTH
104779
10785
10829
10847
10857
10889
10926
10972
11030
11044
11048
11062
11090
11109
11140
11192
11205
12827
$
MERGED
PBU
MWD
MWD
MWD
MWD
MWD
MWD
$
REMARKS:
.0
.5
.0
.0
.0
.5
.5
.0
.0
.5
.0
.0
.5
.5
.0
.5
.0
.0
10784.5
10791.5
10835.5
10851.0
10861.0
10893.5
10930.5
10978.5
11030.0
11043.0
11046.5
11063.5
11090.5
11110.0
11138.0
11198.0
11209.0
12831.0
DATA SOURCE
TOOL CODE
BIT RUN NO MERGE TOP MERGE BASE
7 9950.0 9963.0
8 9963.0 10277.0
9 10277.0 10337.0
10 10337.0 10424.0
11 10424.0 11097.0
12 11097.0 11306.0
13 11306.0 11566.0
14 11566.0 11701.0
15 11701.0 12383.0
16 12383.0 12831.0
MERGED MAIN PASS.
ROP WAS SHIFTED WITH GR.
CN
WN
FN
COUN
STAT
/? ?SHIFT. OUT
$
: ARCO ALASKA INC.
: D.S. 11-34
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
GR MWD 68 1 AAPI
Size
API API API API
Log Crv Crv
Length Typ Typ Cls Mod
4 90 310 01 1
~ ~2 ROP MWD 68 1 FPHR 4 4 90 810 01 1
* DATA RECORD (TYPE# 0)
Total Data Records: 71
1014 BYTES *
Tape File Start Depth = 12831.000000
Tape File End Depth = 9874.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 17746 datums
Tape Subfile: 2 240 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 7
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9882.0
.$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
9900.0
08-NOV-94
MWD 2.16A
3.93
MEMORY
9963.0
9950.0
9963.0
0
.0
.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
NGP 538
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
9.875
4048.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
· MUD CAKE AT MT:
LSND
9.70
.0
9.6
600
.0
.000
.000
.000
.000
.0
124.9
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 7.
$
CN
WN
FN
COUN
STAT
: ARCO ALASKA INC.
: D.S. 11-34
: PRUDHOE BAY
: NORTH SLOPE
: ALAS~
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records:
Tape File Start Depth = 9970.000000
Tape File End Depth = 9882.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
532 datums
Tape Subfile: 3
66 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 8
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9900.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWN-HOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10196.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NAT%KLkL GAMMA PROBE
$
08-NOV-94
MWD 2.16A
3.93
MEMORY
10277.0
9963.0
10277.0
0
.0
.0
TOOL NUMBER
NGP 113
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
9.875
4048.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MLID PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT) :
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
LSND
9.70
.0
9.6
500
.0
.000
.000
.000
.000
.0
124.9
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 8.
CN
WN
FN
COUN
STAT
: ARCO ALASKA INC.
: D.S. 11-34
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 10
Tape File Start Depth = 10280.000000
Tape File End Depth = 9882.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
_
Rep Code: 68 20138 datums
Tape Subfile: 4 73 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 9
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10196.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10256.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
09-NOV-94
MWD 2.16A
3.93
MEMORY
10337.0
10277.0
10337.0
0
.0
.0
TOOL NUMBER
NGP 113
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
9.875
4048.0
BOREHOLE CONDITIONS MUD TYPE:
MI/D DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
LSND
9.70
.0
9.2
5OO
.0
.000
.000
.000
.000
.0
127.4
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 9.
CN
WN
FN
COUN
STAT
ARCO ALASKA INC.
D.S. 11-34
PRUDHOE BAY
NORTH SLOPE
ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
.~ 1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records:
Tape File Start Depth = 10340.000000
Tape File End Depth = 10190.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
1436 datums
Tape Subfile: 5
67 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 6 is type: LIS
FILE HEADER
FILE NI3MBER: 5
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 10
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10256.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
10343.0
10-N07-94
MWD 2.16A
3.93
MEMORY
10424.0
10337.0
10424.0
0
.0
.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
NGP 113
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
9.875
4048.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MI/D AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MI/D CAKE AT MT:
LSND
9.70
.0
9.2
50O
.0
.000
.000
.000
.000
.0
124.9
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 10.
CN
WN
FN
COUN
STAT
: ARCO ALASKA INC.
: D.S. 11-34
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68
2 ROP MWD 68
1 AAPI 4
1 FPHR 4
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 5
Tape File Start Depth = 10430.000000
Tape File End Depth = 10250.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 21222 datums
Tape Subfile: 6 68 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 7 is type: LIS
FILE HEADER
FILE NUMBER: 6
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 11
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10343.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :~
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11016.0
12-NOV-94
MWD 2.16A
3.93
MEMORY
11097.0
10424.0
11097.0
0
.0
.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NI/MBER
NGP 538
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
9.875
4048.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
LSND
9.70
.0
9.1
1000
.0
.000
.000
.000
.000
.0
145.9
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 11.
CN
WN
FN
COUN
STAT
: ARCO ALASKA INC.
: D.S. 11-34
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 19
Tape File Start Depth = 11100.000000
Tape File End Depth = 10340.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
6000 datums
Tape Subfile: 7
82 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 8 is type: LIS
FILE HEADER
FILE NUMBER: 7
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 12
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 11016.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT):
-BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIM UMANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11226.0
14-NOV-94
MWD 2.16A
3.93
MEMORY
11306.0
11097.0
11306.0
0
.0
.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
NGP 95
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
9.875
4048.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
LSND
9.70
.0
9.3
1000
.0
.000
.000
.000
.000
.0
141.6
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
.0
REMARKS: MWD RUN 12.
CN
WN
FN
COUN
STAT
: ARCO ALASKA INC.
: D.S. 11-34
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records:
Tape File Start Depth = 11310.000000
Tape File End Depth = 11010.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
23026 datums
Tape Subfile: 8
71 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 9 is type: LIS
FILE HEADER
FILE NI/MBER: 8
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 13
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 11226.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11485.0
19-NOV-94
MWD 2.16A
3.93
MEMORY
11566.0
11306.0
11566.0
0
.0
.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
NGP 522
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
6.750
11282.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT) :
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
FLO-PRO
9.00
.0
9.4
36000
.0
.000
.000
.000
.000
.0
124.9
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 13.
CN
WN
FN
COUN
STAT
ARCO ALASKA INC.
D.S. 11-34
PRUDHOE BAY
NORTH SLOPE
ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records:
Tape File Start Depth = 11570.000000
Tape File End Depth = 11220.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 8104 datums
Tape Subfile: 9 72 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 10 is type: LIS
FILE HEADER
FILE NUMBER: 9
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 14
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 11485.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11620.0
20-NOV-94
MWD 2.16A
3.93
MEMORY
11701.0
11566.0
11701.0
0
.0
.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
NGP 522
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
6.750
11282.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MI/D AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
FLO- PRO
9.00
.0
9.6
38000
.0
.000
.000
.000
.000
.0
124.8
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
.0
0
REMARKS: MWD RUN 14.
CN
WN
FN
COUN
STAT
ARCO ALASKA INC.
D.S. 11-34
PRUDHOE BAY
NORTH SLOPE
ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records:
Tape File Start Depth = 11705.000000
Tape File End Depth = 11480.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 24380 datums
Tape Subfile: 10 69 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 11 is type: LIS
FILE HEADER
FILE NUMBER: 10
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 15
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 11620.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
12309.0
22-NOV-94
MWD 2.16A
3.93
MEMORY
12383.0
11701.0
12383.0
0
.0
.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
TOOL NUMBER
NGP 113
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
6.750
11282.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
FLO-PRO
9.00
.0
9.4
41000
.0
.000
.000
.000
.000
.0
129.0
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ):
.0
0
REMARKS: MWD RUN 15.
CN
WN
FN
COUN
STAT
: ARCO ALASKA INC.
: D.S. 11-34
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 19
Tape File Start Depth = 12390.000000
Tape File End Depth = 11615.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 12758 datums
Tape Subfile: 11 82 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 12 is type: LIS
FILE HEADER
FILE NUMBER: 11
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 16
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 12309.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
'HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
12753.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
NGP NATURAL GAMMA PROBE
$
22-NOV-94
MWD 2.16A
3.93
MEMORY
12831.0
12383.0
12831.0
0
.0
.0
TOOL NUMBER
NGP 113
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
6.750
11282.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPER3ITURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTR3kTE AT MT:
MUD CAKE AT MT:
FLO-PRO
9.00
.0
9.5
37000
.0
.000
.000
.000
.000
.0
133.2
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 16.
CN
WN
FN
COUN
STAT
: ARCO ALASKA INC.
: D.S. 11-34
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 13
Tape File Start Depth = 12831.000000
Tape File End Depth = 12305.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 27540 datums
Tape Subfile: 12 76 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 13 is type: LIS
96/ 7/11
01
**** REEL TRAILER ****
96/ 7/11
01
Tape Subfile: 13
2 records...
Minimum record length:
Maximum record length:
132 bytes
132 bytes
End of execution: Thu 11 JLY 96 3:05p
Elapsed execution time = 2.03 seconds.
SYSTEM RETURN CODE = 0
Tape Subfile 2 is type: LIS
TAPE HEADER
PRUDHOE BAY UNIT
OPEN HOLE WIRELINE LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
RUN 1
6301.00
K. RICHARDS
D. PULS
REMARKS:
D.S. 11 - 34
500292251600
ARCO ALASKA INCORPORATED
ATLAS WIRELINE SERVICES
21-NOV-94
OPEN HOLE
RUN 2 RUN 3
33
liN
15E
4831
40
63.50
62.00
28.50
CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
10.750 4052.0
9.875 11306.0
DIFL/AC/CN/GR.
CIRCULATION STOPPED AT 0600, 14-NOV-94.
PIPE CONVEYED LOGGING OPERATION.
MEDIUM INDUCTION DATA IS OF QUESTIONABLE QUALITY BUT
PRESENTED PER CLIENT'S REQUEST. DID NOT RE-RUN
BECAUSE OF HORIZONTAL HOLE.
REPEAT SECTION LOGGED DOWN. SPIKES ON THE GAMMA RAY
WERE CAUSED BY NEUTRON SOURCE CHARGING THE FORMATION
WHILE MAKING PIPE CONNECTIONS.
THE AC TOOL WAS CENTRALIZED WITH 3 GEMCO CENTRALIZERS.
NEUTRON LOG PARAMETERS:
SANDSTONE MATRIX,
BOREHOLE CORRECTION = 9.875",
CHISM FILTERING IS ACTIVE,
CASING CORRECTIONS OFF,
SALINITY = 0.00 PPM.
ARCO ALASKA INC
D.S. 11 - 34
RECEIVED
NOV 22 1994
Gas.Cons. Commi~8ion
.!% .... /'~, /'%.
:% x'"-,. /%
./'%. .,.*"% : .'"%~ .,- -=.
.,.'%, ./% ./',.,
Run 1'
14 - November - 1994
DIFLIACICNIGR
9800
1295
MIC 0 i'LN ...
.0,,., ~l.~l~t ~~AS
AtlasJWireline Services
PER CLIENT'S REQUEST, BOREHOLE & TORNADO CHART CORREC-
TIONS WERE APPLIED TO THE DIL DATA. THE DIL DATA WAS
CORRECTED FOR BOREHOLE SIZE (9.875"). THE CORRECTED
DATA WAS THEN USED IN THE ATLAS TORNADO CHART TO GET
"RT" & "DI" CURVES.
THE DEPTH SHIFTED RT & DI CURVES ARE INCLUDED IN A
TRAILING FILE AFTER RAW DATA PER CLIENT'S REQUEST.
RT = TRUE FORMATION RESISTIVITY.
DI = DEPTH OF INVASION.
FILE HEADER
FILE NUMBER: 1
EDITED OPEN HOLE MAIN PASS
All tool strings;
hole data.
DEPTH INCREMENT:
FILE SUMMARY
PBU TOOL CODE
GR
BCS
DIL
2435
$
B~SELINE CURVE FOR SHIFTS: GR
CURVE SHIFT DATA (MEASURED DEPTH)
depth shifted and clipped curves;
.5000
START DEPTH STOP DEPTH
9736.0 11231.0
9771.0 11263.0
9800.0 11295.0
9804.0 11234.0
BASELINE DEPTH DT
9784.5 9784.0
9802.5
9804.5
9807.5
9808.0 9808.5
9810.0
9817.5
9824.0
9826.0
9840.0
9841.0
9853.0 9853.5
9865.5
9871.0
9872.0
9873.0
9874.5
9880.0
9881.0
9895.5
9897.0
9907.0 9907.0
9907.5
9913.0
9913.5
9914.5
9915.0
9916.0
9917.0 9917.0
9917.5
9920.5
9921.0
9922.0
9923.5
9924.5
9927.5
9929.5
9936.0
9940.5
9941.5
all runs merged;
EQUIVALENT UNSHIFTED DEPTH
LL8 ILD NPHI
9802.0
9808.5
9824.5
9841.5
9853.0
9872.5
9908.0
9804.0
9865.5
9874.5
9882.0
9883.0
9896.5
9898.0
9807.5
9810.5
9818.0
9826.5
9840.5
9853.0
9871.5
9874.0
9921.0
9937.0
9941.0
9912.5
9913.0
9913.5
9914.0
9914.5
9915.5
9916.5
9919.5
9920.5
9923.0
9923.5
9927.5
9929.5
9906.5
9942.0
no case
9949.
9949.
9950.
9951.
9953.
9953.
9955.
9956.
9959.
9959.
9963.
9969.
9969.
9970.
9970.
9972.
9977.
9983.
9985.
9986.
9986.
9987.
9988.
9988.
10003.
10008.
10010.
10012.
10014.
10015.
10016.
10018.
10019.
10020.
10027.
10030.
10033.
10036.
10039.
10051.
10056.
10056.
10057.
10062.
10064.
10072.
10072.
10073.
10074.
10075.
10075.
10077.
10077.
10081.
10082.
10082.
10083.
10092.
10096.
10104.
9953.0
9957.0
9983.0
10009.5
10027.5
10057.0
10076.5
10096.0
9960.0
9963.0
9982.5
10010.0
10013.0
10019.0
10027.0
10029.5
10033.0
10051.5
10056.5
10078.0
10092.5
9948.5
9949.0
9950.5
9951.0
9960.0
9964.0
9969.0
9969.5
9970.5
9971.0
9983.0
9984.0
9985.0
9986.0
9988.0
9988.5
10008.0
10014.5
10017.0
10018.5
10026.0
10029.0
10031.5
10038.0
10055.5
10056.5
10062.0
10063.5
10071.0
10071.5
10072.5
10073.5
10074.0
10075.0
10080.5
10081.0
10081.5
10082.5
10105.0
9948.5
9954.0
9955.5
9963.5
9972.5
9977.5
9983.0
10003.0
10009.5
10012.5
10019.5
10036.5
10055.5
10077.0
10104.5
10117.0
10119.0
10122.0
10122.5
10128.5
10132.5
10133.0
10134.0
10139.5
10140.5
10142.5
10145.0
10146.5
10155.0
10155.5
10169.0
10173.0
10174.0
10174.5
10179.0
10180.0
10181.0
10185.5
10189.0
10202.5
10203.0
10213.5
10218.0
10219.5
10228.5
10230.5
10234.5
10239.5
10244.5
10245.0
10246.0
10247.5
10248.5
10250.5
10253.5
10254.5
10257.0
10258.5
10267.0
10271.0
10271.5
10280.5
10284.5
10286.5
10336.5
10340.0
10340.5
10341.5
10347.5
10348.0
10351.5
10364.0
10395.0
10404.0
10119.0
10134.5
10145.0
10174.5
10201.5
10214.0
10229.0
10240.0
10117.0
10129.5
10143.0
10156.0
10175.5
10189.0
10202.5
10214.5
10219.5
10245.5
10259.5
10272.0
10337.0
10341.0
10347.0
10352.0
10394.5
10105.5
10123.0
10133.0
10134.5
10139.5
10140.0
10146.0
10156.0
10170.5
10174.0
10175.0
10179.5
10180.0
10180.5
10202.5
10231.0
10245.0
10245.5
10247.0
10247.5
10252.5
10253.0
10255.5
10267.0
10280.5
10285.5
10287.5
10344.0
10350.5
10404.0
10122.5
10142.5
10185.0
10202.0
10219.0
10234.5
10238.5
10245.0
10250.5
10270.5
10340.5
10364.5
10453.
10459.
10460.
10461.
10464.
10466.
10468.
10470.
10471.
10471.
10472.
10474.
10478.
10479.
10479.
10488.
10488.
10489.
10490.
10495.
10495.
10496.
10501.
10503.
10509.
10514.
10523.
10524.
10525.
10532.
10532.
10536.
10537.
10545.
10545.
10592.
10595.
10598.
10601.
10617.
10621.
10624.
10641.
10654.
10659.
10661.
10662.
10662.
10678.
10681.
10686.
10688.
10690.
10701.
10702.
10702.
10703.
10703.
10704.
10704.
10468.0
10471.5
10475.0
10489.0
10532.5
10545.0
10618.0
10624.5
10654.0
10689.5
10701.5
10452.5
10463.5
10471.0
10531.5
10595.5
10601.0
10618.0
10653.0
10459.5
10460.0
10460.5
10470.0
10471.5
10472.0
10477.5
10478.0
10478.5
10489.5
10490.0
10493.5
10494.0
10494.5
10500.5
10522.0
10522.5
10533.0
10533.5
10658.5
10659.5
10660.5
10663.0
10678.5
10686.0
10688.5
10700.5
10701.0
10701.5
10702.0
10702.5
10467.0
10471.0
10474.5
10488.0
10503.0
10509.5
10513.5
10522.0
10535.5
10544.5
10592.5
10598.5
10621.0
10641.0
10653.0
10682.0
10690.0
10702.0
10705.5
10706.5
10707.5
10708.5
10709.0
10712.5
10713.5
10714.0
10720.5
10736.5
10739.0
10741.5
10749.0
10753.5
10770.5
10773.0
10777.0
10780.0
10781.0
10785.0
10787.0
10787.5
10788.0
10830.0
10847.5
10852.0
10853.0
10855.0
10856.5
10857.0
10877.0
10889.5
10927.5
10930.5
10931.0
10977.5
11020.5
11031.5
11039.5
11050.0
11057.5
11059.5
11060.0
11062.0
11062.5
11065.5
11088.0
11089.0
11090.5
11091.0
11091.5
11092.5
11109.5
11114.0
11118.0
11209.5
11250.5
$
MERGED DATA SOURCE
10712.5
10720.5
10741.5
10755.0
10772.5
10781.0
10785.0
10788.5
10830.0
10847.5
10889.0
10930.5
11020.0
11030.5
11049.5
11059.0
11061.5
11088.0
11113.5
10749.5
10777.5
10787.5
10848.5
10853.0
10858.0
10889.0
11049.0
11059.0
11061.5
11092.5
10703.5
10704.0
10705.0
10705.5
10706.0
10710.0
10710.5
10771.5
10780.0
10788.0
10853.0
10855.0
11057.5
11058.0
11089.5
11090.0
11251.0
10713.0
10738.0
10740.0
10782.0
10788.0
10847.5
10858.0
10877.0
10927.5
10931.5
10977.0
11020.0
11038.0
11057.0
11060.0
11065.0
11089.0
11092.0
11110.0
11118.5
11209.5
PBU TOOL CODE
GR
BCS
DIL
2435
$
REMARKS:
RUN NO. PASS NO. MERGE TOP
~ 3 9736.0
1 3 9771.0
1 3 9800.0
1 3 9804.0
MAIN PASS.
MTEM, TEND, & TENS WERE SHIFTED WITH LL8.
ILM & SP WERE SHIFTED WITH ILD.
FUCT & NUCT WERE SHIFTED WITH NPHI.
MERGE BASE
11231.0
11263.0
11295.0
11234.0
CN
WN
FN
COUN
STAT
/ ? ?MATCH1. OUT
/ ? ?MATCH2. OUT
/??MATCH3 .OUT
/ ? ?MATCH4. OUT
$
: ARCO ALASKA INC.
: D.S. 11-34
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
12 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR BCS 68 1 GAPI
2 DT BCS 68 1 US/F
3 TEND BCS 68 1 LB
4 TENS BCS 68 1 LB
5 LL8 DIL 68 1 OHMM
6 ILM DIL 68 1 OHMM
7 ILD DIL 68 1 OHM~
8 SP DIL 68 1 MV
9 MTEM DIL 68 1 DEGF
10 NPHI 2435 68 1 PU-S
11 FUCT 2435 68 1 CPS
12 NUCT 2435 68 1 CPS
4 4 67 465 06 6
4 4 84 653 71 5
4 4 20 789 90 0
4 4 20 789 90 0
4 4 50 746 76 1
4 4 50 746 76 1
4 4 50 746 76 1
4 4 50 746 76 1
4 4 50 746 76 1
4 4 98 211 23 1
4 4 98 211 23 1
4 4 98 211 23 1
48
* DATA RECORD (TYPE# 0) 994 BYTES *
Total Data Records: 166
Tape File Start Depth =
Tape File End Depth =
Tape File Level Spacing =
11305.000000
9730.000000
0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 40964 datums
Tape Subfile: 2 560 records...
Minimum record length: 62 bytes
Maximum record length: 994 bytes
Tape Subfile 3 is typ~: LIS
FILE HEADER
FILE NUMBER: 2
RAW OPEN HOLE MAIN PASS
Curves and log header data for each run and tool string in separate files;
Tool String #1 for Sadlerochit run presented first (primary depth control
string used to depth shift the Sadlerochit interval) followed by files for
other main pass tool strings per run.
RUN NUMBER:
TOOL STRING NUMBER:
PASS NUMBER:
DEPTH INCREMENT:
FILE SUMMARY
1
1
3
.2500
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 9736.0 11233.0
AC 9770.5 11268.0
DIFL 9793.5 11297.0
2435 9742.0 11240.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SWIV
CHT
MIS
TEMP
GR
CN
PCM
KNJT
KNJT
AC
DIFL
$
SWIVEL SUB
CABLEHEAD TENSION
MASS ISOLATION SUB
TEMPERATURE
GAMMA RAY
COMPENSATED NEUTRON
PULSE CODE MODULATOR
KNUCKLE JOINT
KNUCKLE JOINT
BHC-ACOUSTILOG
DUAL INDUCTION
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
FLUID LOSS (C3):
14-NOV-94
FSYS J1V2 BETA RELEASE 4
600 14-NOV-94
153 15-NOV-94
11306.0
11299.0
9800.0
11296.0
1500.0
TOOL NUMBER
3944XB
3974XA
3967XA
2806XA
1309XA
2435XA
3506XA
3921NA
3921NA
1609EA/1603MA
1503XA
9.875
4052.0
.0
LSND
9.70
46.0
5.0
8.8
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHkM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS: MAIN PASS.
$
CN
WN
FN
COUN
STAT
: ARCO ALASKA INC.
: D.S. 11-34
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
164.0
1.730
.636
1.690
.000
2.240
.000
THERMAL
SANDSTONE
.00
9.875
1.5
56.0
164.0
56.0
.0
56.0
.0
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
20 Curves:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Name Tool Code Samples Units
GR AC 68 1 GAPI
AC AC 68 1 US/F
CHT AC 68 1 LB
TTEN AC 68 1 LB
SPD AC 68 1 F/MN
RFOC DIFL 68 1 OHMM
RILM DIFL 68 1 OHMM
RILD DIFL 68 1 OHMM
CILD DIFL 68 1 MMHO
VILD DIFL 68 1 MV
VILM DIFL 68 1 MV
RT DIFL 68 1 OHMM
DI DIFL 68 1 IN
SP DIFL 68 1 MV
TEMP DIFL 68 1 DEGF
CNC 2435 68 1 PU-S
CNCF 2435 68 1 PU-S
CN 2435 68 1 PU-L
LSN 2435 68 1 CPS
SSN 2435 68 1 CPS
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 06 969 49 6
4 4 48 852 89 1
4 4 95 558 30 1
4 4 95 558 30 1
4 4 61 094 30 1
4 4 27 515 24 6
4 4 06 213 78 0
4 4 04 903 06 0
4 4 34 704 23 6
4 4 04 522 10 6
4 4 04 522 10 6
4 4 04 903 06 0
4 4 06 213 78 0
4 4 53 419 67 0
4 4 40 467 34 0
4 4 98 211 23 1
4 4 98 211 23 1
4 4 52 326 75 5
4 4 84 023 70 1
4 4 83 368 34 1
80
* DATA RECORD (TYPE# 0)
Total Data Records: 529
1014 BYTES *
Tape File Start Depth = 11307.000000
Tape File End Depth = 9723.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 133078 datums
Tape Subfile: 3 611 records...
Minimum record length: 44 bytes
Maximum record length: 1014 bytes
Tape Subfile 4 is typ~: LIS
FILE HEADER
FILE NUMBER: 3
RAW OPEN HOLE REPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate
files.
RUN NUMBER: 1
TOOL STRING NUMBER: 1
PASS NUMBER: 2
DEPTH INCREMENT: .2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10101.0
AC 10139.0
DIFL 10159.0
2435 10107.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR) :
STOP DEPTH
11229.0
11264.0
11297.0
11236.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SWIV
CHT
MIS
TEMP
GR
CN
PCM
KNJT
KNJT
AC
DIFL
$
SWIVEL SUB
CABLEHEAD TENSION
MASS ISOLATION SUB
TEMPERATURE
GAMMA RAY
COMPENSATED NEUTRON
PULSE CODE MODULATOR
KNUCKLE JOINT
KNUCKLE JOINT
BHC-ACOUSTILOG
DUAL INDUCTION
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
14-NOV-94
FSYS JlV2 BETA RELEASE 4
600 14-NOV-94
19 15-NOV-94
11306.0
11299.0
9800.0
11296.0
1500.0
TOOL NUMBER
3944XB
3974XA
3967XA
2806XA
1309XA
2435XA
3506XA
3921NA
3921NA
1609EA/1603MA
1503XA
9.875
4052.0
.0
LSND
9.70
46.0
5.0
8.8
164.0
MUD AT MEASURED TEMPERATURE (MT):
MUD AT B-OTTO~ HOLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS:
REPEAT PASS (DOWN LOG).
$
CN
WN
FN
COUN
STAT
: ARCO ALASKA INC.
: D.S. 11-34
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
1.730
.636
1.690
.000
2.240
.OO0
THERMAL
SANDSTONE
.00
9.875
1.5
56.0
164.0
56.0
.0
56.0
.0
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
20 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR AC 68 1 GAPI 4
2 AC AC 68 1 US/F 4
3 CHT AC 68 1 LB 4
4 TTEN AC 68 1 LB 4
5 SPD AC 68 1 F/MN 4
6 RFOC DIFL 68 1 OHMM 4
7 RILM DIFL 68 1 OHMM 4
8 RILD DIFL 68 1 OHMM 4
9 CILD DIFL 68 1 MMHO 4
10 VILD DIFL 68 1 MV 4
11 VILM DIFL 68 1 MV 4
12 RT DIFL 68 1 OHMM 4
13 DI DIFL 68 1 IN 4
14 SP DIFL 68 1 MV 4
15 TEMP DIFL 68 1 DEGF 4
16 CNC 2435 68 1 PU-S 4
17 CNCF 2435 68 1 PU-S 4
18 CN 2435 68 1 PU-L 4
19 LSN 2435 68 1 CPS 4
20 SSN 2435 68 1 CPS 4
4 06 969 49 6
4 48 852 89 1
4 95 558 30 1
4 95 558 30 1
4 61 094 30 1
4 27 515 24 6
4 06 213 78 0
4 04 903 06 0
4 34 704 23 6
4 04 522 10 6
4 04 522 10 6
4 04 903 06 0
4 06 213 78 0
4 53 419 67 0
4 40 467 34 0
4 98 211 23 1
4 98 211 23 1
4 52 326 75 5
4 84 023 70 1
4 83 368 34 1
80
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data ~Reco~ds: 406
Tape File Start Depth = 11305.000000
Tape File End Depth = 10089.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 143130 datums
Tape Subfile: 4 486 records...
Minimum record length: 44 bytes
Maximum record length: 1014 bytes
Tape Subfile 5 is ty~e: LIS
THE CURVES RT & DI HAVE BEEN DEPTH SHIFTED. THE SAME SHIFTS WERE APPLIED
AS THOSE USED FOR ILD, ILM, & SP CURVES IN THE EDITED MAIN PASS FILE.
THIS FILE IS INCLUDED IN THIS FORMAT PER BP EXPLORATION REQUEST.
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 RT DIL 68 1 OHMM
2 DI DIL 68 1 IN
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 50 746 76 1
4 4 50 746 76 1
* DATA RECORD (TYPE# 0)
Total Data Records: 38
1014 BYTES *
Tape File Start Depth = 11305.000000
Tape File End Depth = 9730.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 142532 datums
Tape Subfile: 5 43 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 6 is~type: LIS
94/11/21
01
**** REEL TRAILER ****
94/11/21
01
Tape Subfile: 6 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Mon 21 NOV 94 2:16p
Elapsed execution time = 17.57 seconds.
SYSTEM RETURN CODE = 0
* ALASKA COMPUTING CENTER *
....... SCHLUMBERGER .......
COMPANY NAlViE : ARCO ALASKA, INC.
WELL NAME : D.S. 11-34
FIELD NAME : PRUDHOE BAY
BOROUGH : NORTH SLOPE
STATE : ALASKA
API NUMBER : 500292251600
REFERENCE NO : 98133
J Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1998 14:23
PAGE:
**** REEL HEADER ****
SERVICE NAME : EDIT
DATE · 98/03/24
ORIGIN · FLIC
REEL NAME : 98133
CONTINUATION # :
PREVIOUS REEL :
COGENT : ARCO ALASKA INC., PRUDHOE BAY, D.S. 11-34, API# 50-029-22516-00
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE · 98/03/24
ORIGIN · FLIC
TAPE NAME · 98133
CONTINUATION # : 1
PREVIOUS TAPE :
COGENT : ARCO ALASKA INC., PRO-DHOE BAY, D.S. 11-34, API# 50-029-22516-00
TAPE HEADER
Prudhoe Bay
CASED HOLE WIRELINE LOGS
WELL NAME: D.S. 11-34
API NTJMBER: 500292251600
OPERATOR: ARCO ALASKA, INC.
LOGGING COMPANY: SCHLUMBERGER WELL SERVICES
TAPE CREATION DATE: 24-MAR-98
JOB NUMBER: 98133
LOGGING ENGINEER: C. Yon
OPERATOR WITNESS: J. Hupp
SURFACE LOCATION
SECTION: 33
TOWNSHIP: liN
RANGE: 1SE
FNL:
FSL: 4831
FEL: 40
FWL:
ELEVATION(FT FROM MSL O)
KELLY BUSHING: 63.50
DERRICK FLOOR: 62. O0
GROUND LEVEL: 28.50
WELL CASING RECORD
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
1ST STRING 9. 875 7. 625 11198. 0
2ND STRING
3RD STRING
PRODUCTION STRING
CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASURED DEPTH)
~ Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1998 14:23
BASELINE CURVE FOR SHIFTS
LDWG TOOL CODE: BCS
LDWG CURVE CODE: GR
RUN NUMBER:
PASS NUMBER:
DATE LOGGED: 14-NOV- 94
LOGGING COMPANY: WESTERN ATLAS
BASELINE DEPTH
88888.0
11132.0
11131.5
11122.5
11119.5
11115.5
11111.5
11107.0
11092.5
11091.0
11088.5
11085.0
11084.0
11081.0
11080.5
11078.0
11077.0
11072.0
11064.5
11062.5
11062.0
11059.5
11058.5
11054.0
11049.5
11044.0
11043.5
11039.0
11035.0
11030.5
11029.0
11028.5
11025.0
11023.0
11014.0
11009.5
11004.0
11002.5
11000.0
10998.5
10987.5
10983.0
10981.0
10977.5
10971.5
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH CNTG
88889.5
11133.5
11123.5
11121.5
11115.5
11112.0
11107.5
11092.5
11088.5
11084.5
11079.0
11077.5
11072.5
11065.0
11061.5
11060.0
11057.0
11050.5
11043.5
11039.5
11034.5
11031.5
11029.0
11023 0
11021 5
11015 5
11010 5
11004 0
11001 5
11000.0
10998 5
10988 0
10982 5
10979 5
10977 0
10971 5
88889.5
11133.0
11123.5
11121.5
11107.5
11092.5
11088.5
11084.5
11079.0
11077.5
11065.0
11062.0
11060.0
11050.5
11043.5
11039.5
11034.5
11031.5
11029.0
11021.5
11010.5
11004.0
11001.5
11000.0
10998.5
10988.0
10982.5
10979.5
10977.0
10971.5
PAGE:
.~ Tape Verification Listing
Schlumberger Alaska Computing Center
10962.0
10953.0
10948.0
10941.5
10940.0
10937.0
10932.0
10929.5
10926.5
10921.5
10918.0
10916.0
10912.5
10906.0
10892.5
10890.5
10887.0
10875.0
10873.0
10868.0
10866.0
10858.5
10858.0
10853 5
10852 0
10848 5
10846 0
10845 0
10841 0
10833 0
10832.0
10831.5
10824.5
10809.5
10802.5
10801.5
10794.5
10794.0
10793.0
10792.5
10791.0
10790.0
10787.0
10786.0
10785.0
10781.5
10781.0
10778.0
10775.0
10770.5
10769 5
10765 0
10760 0
10757 5
10754 5
10748 5
10961.5
10954.0
10949.0
10940.5
10939.5
10935.5
10931.0
10928.0
10925.0
10922.0
10918.0
10915.0
10891.5
10890.0
10884.5
10873.5
10869.5
10867.5
10857.0
10852.5
10851.0
10847.5
10844.0
10843.0
10833.0
10830.5
10822.5
10809.5
10803.0
10794.0
10792.0
10789.5
10787.5
10785.0
10781.0
10777.0
10772.5
10770.5
10764.0
10760.0
10753.5
10748.5
10961.5
10954.0
10949.0
10940.5
10939.5
10935 5
10931 0
10928 0
10925 0
10922 0
10918 0
10915 0
10908 0
10902.5
10891.5
10890.0
10884.5
10874.0
10857.0
10852.5
10851.0
10847.5
10844.0
10833.0
10830.5
10822.5
10809.5
10803.0
10793.5
10792.0
10789.5
10785.0
10781.0
10777.0
10773.0
10757.0
10748.5
24-MAR-1998 14:23
PAGE:
~S Tape Verification Listing
Schlumberger Alaska Computing Center
10747.0
10740.0
10730.5
10719.5
10714.0
10712.0
10707.5
10702.5
10702.0
10701.0
10694.0
10689.5
10687.0
10684.5
10684.0
10677.0
10671.0
10669.0
10655.5
10654.5
10648.5
10642.5
10638.0
10636.5
10629.0
10627.0
10625.5
10623.5
10622.5
10613.5
10604.0
10597.5
10594.0
10588.5
10582.5
10566.5
10558.0
10555.0
10547.0
10546.5
10542.0
10537.5
10534.0
10530.0
10529 5
10524 5
10524 0
10518 5
10517 0
10515 5
10511.5
10510.0
10508.0
10505.5
10503.5
10502.0
10745.5
10740.0
10727.5
10715.5
10712.5
10707.5
10702.5
10700.5
10694.0
10690.0
10687.0
10683.0
10677.5
10669.5
10654.0
10648.5
10641.0
10633.5
10626.0
10624.5
10621.0
10612.0
10601.5
10595.5
10592 0
10587 0
10583 5
10566 0
10560 0
10554 0
10545.5
10540.0
10536.5
10532.5
10528.5
10523.0
10517.5
10514.5
10509.0
10505.0
10502.0
10499.5
10745 5
10740 0
10727 5
10720 0
10715 5
10712 5
10707 5
10702 5
10700.5
10694.0
10690.0
10687.0
10683.0
10669.5
10654.5
10648.5
10637.5
10624.5
10621.5
10612.0
10601.5
10595.5
10592.0
10587.0
10583.5
10566.0
10560.0
10554.0
10546.0
10538.0
10532.5
10528.5
10523.5
10517.5
10513.0
10509.0
10503.5
10499.5
24-MAR-1998 14:23
PAGE:
_S Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1998 14:23
10496.0
10491.5
10489.0
10485.0
10483.5
10476.5
10476.0
10473 0
10472 5
10469 0
10468 5
10465 5
10465 0
10458 5
10452 5
10450 0
10441 5
10435 0
10433 5
10426.5
10426.0
10415 5
10411 5
10410 5
10404 0
10394 0
10392 0
10391 5
10388 0
10386.0
10382.5
10381.5
100.0
$
REMARKS:
10495.5
10491.0
10488.0
10485.5
10483.0
10474.5
10471.5
10468.5
10464.5
10455.0
10446.0
10440.0
10435.0
10426.0
10415.5
10411.0
10403.0
10394.5
10391.5
10388.0
10385.5
10381.5
100.0
10495.5
10491.0
10488.0
10485.5
10483.0
10474.5
10471.5
10468.5
10464.5
10447.0
10440.0
10432.0
10426.0
10415.5
10411.0
10403.0
10391.5
10381.5
99.0
CONTAINED HEREIN IS THE LDWG FORMATTED CASED HOLE CNTG
DATA AQUIRED ON ARCO ALASKA'S DS 11-34 WELL. THE DEPTH
SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH
PASS #1 AND THE BCS GA24FIA RAY, ALSO PASS #1 NPHI AND
THE BCS GAB~4A RAY, CARRYING ALL CNTG CURVES WITH THE
NPHI SHIFTS.
$
$
PAGE:
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE · FLIC
VERSION · O01CO1
DATE : 98/03/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
.~S Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1998 14:23
PAGE:
FILE HEADER
FILE NUMBER: 1
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUM~ER: 1
DEPTH INCREMENT: 0.5000
FILE SU~ff~ARY
LDWG TOOL CODE START DEPTH STOP DEPTH
GRCH 11137.5 10380.0
CNTG 11142.5 10379.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE:
PASS NUMBER:
BASELINE DEPTH
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GR CH CNTG
REMARKS: THIS FILE CONTAINS CASED HOLE CNTG PASS #1.
NO PASS TO PASS SHIFTS APPLIED TO THIS DATA.
LIS FORMAT DATA
THERE ARE
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 68
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 15
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
~S Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1998 14:23
PAGE:
** SET TYPE - CHAN **
NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1022548 O0 000 O0 0 1 1 1 4 68 0000000000
NPHI CNTG PU-S 1022548 O0 000 O0 0 1 1 1 4 68 0000000000
ENPH CNTG PU-S 1022548 O0 000 O0 0 1 1 1 4 68 0000000000
CPHI CNTG PU-S 1022548 O0 000 O0 0 1 1 1 4 68 0000000000
NRAT CNTG 1022548 O0 000 O0 0 1 1 1 4 68 0000000000
CRAT CNTG 1022548 O0 000 O0 0 1 1 1 4 68 0000000000
ENNA CNTG 1022548 O0 000 O0 0 1 1 1 4 68 0000000000
NCNT CNTG CPS 1022548 O0 000 O0 0 1 1 1 4 68 0000000000
FCNT CNTG CPS 1022548 O0 000 O0 0 1 1 1 4 68 0000000000
CNTC CNTG CPS 1022548 O0 000 O0 0 1 1 1 4 68 0000000000
CFTC CNTG CPS 1022548 O0 000 O0 0 1 1 1 4 68 0000000000
CNEC CNTG CPS 1022548 O0 000 O0 0 1 1 1 4 68 0000000000
CFEC CNTG CPS 1022548 O0 000 O0 0 1 1 1 4 68 0000000000
GRCH CNTG GAPI 1022548 O0 000 O0 0 1 1 1 4 68 0000000000
TENS CNTG LB 1022548 O0 000 O0 0 1 1 1 4 68 0000000000
CCL CNTG V 1022548 O0 000 O0 0 1 1 1 4 68 0000000000
GR BCS GAPI 1022548 O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
DEPT. 11200.000 NPHI.CNTG -999.250 ENPH. CNTG -999.250 CPHI.CNTG
ATRAT. CNTG -999.250 CRAT. CNTG -999.250 ENRA.CNTG -999.250 NCNT. CNTG
FCNT. CNTG -999.250 CNTC. CNTG -999.250 CFTC. CNTG -999.250 CNEC. CNTG
CFEC. CNTG -999.250 GRCH. CNTG -999.250 TENS.CNTG -999.250 CCL. CNTG
GR.BCS 57.128
DEPT. 10350.000 NPHI.CNTG -999.250 ENPH. CNTG
NRAT. CNTG -999.250 CRAT. CNTG -999.250 ENRA.CNTG
FCNT. CNTG -999.250 CNTC. CNTG -999.250 CFTC. CNTG
CFEC. CNTG -999.250 GRCH. CNTG -999.250 TENS.CNTG
GR.BCS 25.298
-999.250 CPHI.CNTG
-999.250 NCNT. CNTG
-999.250 CNEC. CNTG
-999.250 CCL.CNTG
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/03/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
~£S Tape Verification Listing
Schlumberger Alaska Computing Center
24-M~AR-1998 14:23
PAGE:
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/03/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER: 2
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 2
DEPTH INCREMENT: O. 5000
FILE SUMPiARY
LDWG TOOL CODE START DEPTH STOP DEPTH
GRCH 11134.0 10368.5
CNTG 11140.0 10369.5
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE: GRCH
PASS NUMBER: 1
BASELINE DEPTH
88888.0
11133.5
11131.0
11129.5
11129.0
11124.5
11121.5
11118.5
11118.0
11117.0
11115 5
11114 5
11111 0
11110 0
11107 0
11103 5
11103 0
111010
11098.5
11093.5
11093.0
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH CNTG
88888.0 88889.0
11129.5
11120.0
11115.5
11112.0
11107.5
11102.5
11097.0
11092.5
11134.5
11133.0
11131.0
11127.0
11123.5
11120.5
11119.0
11116.5
11111.5
11106.5
11104.0
11093.0
~£S Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1998 14:23
PAGE:
11090.0
11088.0
11087.5
11085.5
11083.0
11079.5
11075.0
11073.5
11071.5
11068.0
11064.0
11063.0
11062.0
11058.5
11058.0
11057.0
11054.5
11051.5
11050.0
11048.5
11047.5
11047.0
11044.0
11041.0
11036.0
11035 5
11033 5
11030 0
11026 5
11023 0
11022 5
11021 0
11019 0
11017 0
11012.5
11010.5
11010.0
11004.5
11002.5
11001.0
10997.0
10994.5
10993.0
10991.0
10986.0
10985.0
10983.5
10981.5
10980.0
10978.5
10976.0
10968.5
10966.0
10965.5
10964.0
11088.0
11084.5
11078.5
11073.5
11068.0
11065.0
11061.5
11060.0
11056.5
11049.5
11047.5
11043.5
11034.5
11033.5
11029.0
11026.0
11021.5
11017.5
11015.5
11010.5
11004.0
10993.5
10984.5
10982.5
10977.0
10965.5
10962.5
11090.0
11087.0
11082.0
11078.5
11077.5
11073.0
11062.0
11059.5
11056.5
11053.5
11050.0
11048.5
11046.0
11043.5
11042.0
11037.0
11033.5
11029.0
11021.5
11019.5
11013.5
11010.0
11004.0
11001.0
10997.5
10994.0
10993.0
10986.0
10979.5
10976.5
10974.0
10970.0
10968.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1998 14:23
PAGE: 10
10963.0 10963.0
10961.5 10961.5
10959.0 10959.5
10956.0 10956.5
10945.5 10944.5
10943.0 10942.5 10941.5
10939.5 10940.5
10934.5 10934.0
10932.5 10931.5
10931.5 10930.0
10931.0 10928.0
10927.0 10925.0
10926.0 10924.5
10923.0 10922.5
10917.5 10918.5
10917.0 10914.0
10913.0 10912.0
10912.0 10907.5
10909.0 10904.5
10906.5 10902.0
10906.0 10905.0
10903.0 10900.5
10900.5 10896.5
10897.0 10894.5
10891.0 10887.5
10890.5 10889.0
10887.5 10884.5
10887.0 10884.5
10884.5 10882.5
10883.5 10882.0
10883.0 10879.5
10875.5 10874.0
10872.0 10873.0
10870.5 10868.5
10869.5 10869.5
10867.5 10867.5
10864.5 10862.5
10860.5 10859.5
10858.5 10857.0 10857.0
10854.5 10855.5
10853.0 10852.0
10852.5 10854.5
10851.5 10850.5
10849.5 10847.5
10848.5 10847.5
10845.5 10843.0 10844.0
10839.0 10838.0
10836.5 10836.0
10835.5 10835.0
10833.0 10833.0
10831.5 10830.5
10831.0 10829.0
10828.0 10827.5 10824.5
10825.0 10822.5
10824.0 10822.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1998 14:23
PAGE: 11
10823.5
10817.5
10814.0
10809.0
10808.5
10805.5
10801.5
10794.5
10793.5
10789.0
10787.5
10786.0
10785.0
10783.5
10782.5
10777.5
10774.0
10771.5
10767.5
10766.0
10762.0
10758.0
10755.5
10754.5
10754.0
10751.5
10747.5
10745.0
10743 0
10741 0
10740 0
10738 0
10733 5
10730 0
10728 0
10723 5
10723 0
10719 5
10716 5
10714 5
10714.0
10712.5
10708.0
10707.5
10705.0
10701.5
10699.0
10697.5
10694.0
10692.5
10689.0
10687.5
10685.0
10682.5
10681.0
10821.5
10814.0
10809.5
10800.0
10792.0
10787.5
10785.0
10781.5
10776.5
10770.5
10764.5
10753.5
10745.5
10742.0
10737.0
10727.5
10722.0
10715.5
10713.0
10708.0
10701.0
10694.0
10816.5
10813.5
10808.0
10806.5
10794.0
10787.0
10785.0
10782.0
10776.0
10775.0
10773.0
10767.0
10757.5
10755.0
10754.0
10750.5
10749.0
10741.0
10736.0
10731.0
10727.5
10723.0
10720.0
10717.5
10715.0
10707.5
10704.5
10701.0
10699.0
10697.0
10692.5
10688.5
10686.0
10683.5
10679.5
10677.5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1998 14:23
PAGE: 12
10677.5 10677.5
10674.5 10674.0
10673.0 10672.0
10669.5 10671.0
10669.0 10670.0
10668.0 10669.5
10666.0 10664.5
10659.0 10659.0
10656.0 10654.5
10653 . 5 10653 . 5
10650.0 10648.5
10646.0 10647.5
10643.0 10644.0
10641.5 10641.5
10638.0 10637.5
10636.5 10633.5
10635.0 10633.5
10631.5 10629.0
10630.0 10628.5
10626.5 10625.5
10623.0 10621.5
10622.0 10621.0
10620.0 10619.0
10619.0 10617.0
10618.5 10616.5
10615.0 10615.0
10613.0 10610.5
10612.5 10612.0
10607.5 10606.5
10603.5 10603.0
10602.0 10601.0
10599.5 10597.0
10597.5 10595.0
10597.0 10595.0
10595.0 10592.5
10586.0 10585.0
10585.0 10585.0
10583.0 10583.5
10580.5 10581.5
10579.0 10582.5 10578.5
10576.0 10574.0
10573.5 10573.0
10570.0 10568.5
10569.0 10567.0
10567.0 10566.5
10564.5 10564.5
10563.0 10560.5
10561.0 10561.5
10559.5 10560.5
10557.5 10559.0
10556.5 10556.0
10554.5 10554.0
10551.5 10550.5
10548.0 10546.5
10547.5 10546.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1998 14:23
PAGE: 13
10545.0
10540.0
10537.0
10534.0
10531.0
10530.0
10524.5
10524.0
10519.5
10518.5
10516.0
10515.5
10514.0
10511.5
10506.5
10505.5
10502.0
10496.0
10493.5
10491.5
10489.0
10486.5
10484.5
10483.0
10481.5
10480.0
10478.5
10477.0
10476.5
10473 0
10469 5
10469 0
10467 5
10465 0
10464 0
10459 5
10446 0
10445 0
10437 5
10436 0
10434.0
10426.5
10425.5
10423.0
10421.5
10420.5
10419.0
10414.5
10410.5
10407.5
10407.0
10404.5
10403.5
10403.0
10401.0
10540.0
10532.5
10528.5
10523.0
10517.5
10513.5
10510.5
10509.0
10503.0
10499.5
10491.5
10488.0
10478.0
10474.5
10471.5
10468.5
10466.5
10464.5
10444.5
10435.0
10424.5
10421. 0
10420.5
10415.5
10410.5
10406.0
10403. 0
10401.5
10545.0
10537.5
10529.5
10523.5
10517.5
10513.0
10509. 0
10503.5
10499.5
10495.0
10492.5
10488. 0
10486.5
10485.5
10483.0
10480.5
10478.5
10474.5
10471.5
10468.5
10464.5
10454.5
10443.5
10436.0
10432.0
10426.0
10421.0
10418.5
10410.5
10406.5
10403.0
10401.5
10400.5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1998 14:23
PAGE: 14
10397.5 10396.5 10396.5
10392.5 10391.5
10391.5 10391.5
10387.0 10386.0
10386.0 10385.5
10383.0 10381.5
10382.0 10381.5
100.0 98.5 99.5
$
REMARKS: THIS FILE CONTAINS CASED HOLE CNTG PASS #2. THE DEPTH
SHIFTS SHOWN ABOVEREFLECT CORRELATIONS BETWEEN GRCH
PASS #2 AND GRCH PASS #1, ALSO NPHI PASS #2 AND NPHI
PASS #ii CARRYING ALL CNTG CURVES WITH THE NPHI SHIFTS.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 64
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 16
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1022548 O0 000 O0 0 2 1 1 4 68 0000000000
NPHI CNTG PU-S 1022548 O0 000 O0 0 2 1 1 4 68 0000000000
ENPH CNTG PU-S 1022548 O0 000 O0 0 2 1 1 4 68 0000000000
CPHI CNTG PU-S 1022548 O0 000 O0 0 2 1 1 4 68 0000000000
NN~T CNTG 1022548 O0 000 O0 0 2 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1998 14:23
PAGE: 15
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELaM CODE (HEX)
CRAT CNTG 1022548 O0 000 O0 0 2 1 1 4 68 0000000000
ENP~ CNTG 1022548 O0 000 O0 0 2 1 1 4 68 0000000000
NCNT CNTG CPS 1022548 O0 000 O0 0 2 1 1 4 68 0000000000
FCNT CNTG CPS 1022548 O0 000 O0 0 2 1 1 4 68 0000000000
CNTC CNTG CPS 1022548 O0 000 O0 0 2 1 1 4 68 0000000000
CFTC CNTG CPS 1022548 O0 000 O0 0 2 1 1 4 68 0000000000
CNEC CNTG CPS 1022548 O0 000 O0 0 2 1 1 4 68 0000000000
CFEC CNTG CPS 1022548 O0 000 O0 0 2 1 1 4 68 0000000000
GRCH CNTG GAPI 1022548 O0 000 O0 0 2 1 1 4 68 0000000000
TENS CNTG LB 1022548 O0 000 O0 0 2 1 1 4 68 0000000000
CCL CNTG V 1022548 O0 000 O0 0 2 1 1 4 68 0000000000
** DATA
DEPT. 11140.000 NPHI. CNTG 34.050 ENPH. CNTG 34.722 CPHI.CNTG
NRAT. CNTG 3.309 CRAT. CNTG 3.270 ENRA.CNTG 5.131 NCNT. CNTG
FCNT. CNTG 548.936 CNTC. CNTG 1901.282 CFTC. CNTG 616.754 CNEC. CNTG
CFEC. CNTG 510.195 GRCH. CNTG -999.250 TENS.CNTG -5.000 CCL.CNTG
DEPT. 10368.500 NPHI.CNTG -999.250 ENPH. CNTG -999.250 CPHI.CNTG
N-RAT. CNTG -999.250 CRAT. CNTG -999.250 ENRA.CNTG -999.250 NCNT. CNTG
FCNT. CNTG -999.250 CNTC. CNTG -999.250 CFTC. CNTG -999.250 CNEC. CNTG
CFEC. CNTG -999.250 GRCH. CNTG 17.578 TENS.CNTG -999.250 CCL.CNTG
31.072
1999.230
2617.640
-0.074
-999.250
-999.250
-999.250
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/03/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .003
SERVICE · FLIC
VERSION : O01CO1
DATE : 98/03/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1998 14:23
PAGE: 1 6
FILE HEADER
FILE NUMBER: 3
AVERAGED CURVES
Compensated Neutron: Arithmetic average of edited passes for all curves.
DEPTH INCREMENT O. 5000
PASSES INCLUDED IN AVERAGE
LDWG TOOL CODE PASS NUMBERS
1, 2,
CNTG
$
REMARKS:
THIS FILE CONTAINS THE ARITIffdETIC AVERAGE OF PASSES
1 & 2.THE DATA WAS CLIPPED AND DEPTH SHIFTED BEFORE
THE AVERAGE WAS CALCULATED.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 52
4 66 1
5 66
6 73
7 65
8 68 O. 5
9 65 FT
11 66 19
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NOW~ SAMP ELEM CODE (HEX)
DEPT FT 1022548 O0 000 O0 0 3 1 1 4 68 0000000000
NPHI CNAV PU-S 1022548 O0 000 O0 0 3 1 1 4 68 0000000000
NRAT CNAV 1022548 O0 000 O0 0 3 1 1 4 68 0000000000
CPHI CNAV PU-S 1022548 O0 000 O0 0 3 1 1 4 68 0000000000
CRAT CNAV 1022548 O0 000 O0 0 3 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1998 14:23
PAGE: 17
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
ENPH CNAV PU-S 1022548 O0 000 O0 0 3 1 1 4 68 0000000000
ENP~ CNAV 1022548 O0 000 O0 0 3 1 1 4 68 0000000000
NCNT CNAV CPS 1022548 O0 000 O0 0 3 1 1 4 68 0000000000
FCNT CNAV CPS 1022548 O0 000 O0 0 3 1 1 4 68 0000000000
CNTC CNAV CPS 1022548 O0 000 O0 0 3 1 1 4 68 0000000000
CFTC CNAV CPS 1022548 O0 000 O0 0 3 1 1 4 68 0000000000
CNEC CNAV CPS 1022548 O0 000 O0 0 3 1 1 4 68 0000000000
CFEC CNAV CPS 1022548 O0 000 O0 0 3 1 1 4 68 0000000000
** DATA **
DEPT. 11140.000 NPHI.CNAV 33.625 NRAT. CNAV 3.268 CPHI.CNAV 31.711
CRAT. CNAV 3.247 ENPH. CNAV 34.504 ENRA.CNAV 5.110 NCNT. CNAV 1974.073
FCNT. CNAV 553.146 CNTC. CNAV 1887.946 CFTC. CNAV 604.549 CNEC. CNAV 2596.662
CFEC. CNAV 508.173
DEPT. 10379.000 NPHI. CNAV 9.971 NRAT. CNAV 1.821 CPHI.CNAV 11.845
CRAT. CNAV 1.751 ENPH. CNAV 15.793 Ei~RA.CNAV 3.028 NCNT. CNAV 3249.237
FCNT. CNAV 1721.267 CNTC. CNAV 3209.973 CFTC. CNAV 1844.119 CNEC. CNAV 3337.502
CFEC. CNAV 1102.325
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION · O01CO1
DATE . 98/03/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/03/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1998 14:23 PAGE: 18
FILE NTJM~ER 4
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
CNTG 11154.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
DEPTH CONTROL USED (YES/NO):
STOP DEPTH
10380.0
TOOL STRING (TOP TOBOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAMMA RAY
CNTG COMPENSATED NEUTRON
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOF~E (DEG) :
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
25-NOV-97
8C0-069
1613 25-NOV-97
11100.0
10370.0
11141.0
TOOL NUMBER
...........
SGC-SA 404
CNT-G
9.875
11198.0
Produced Fluids
EPITHERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1998 14:23
PAGE: 19
BASE NORMALIZING WINDOW (FT) :
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 6400
NEAR COUNT RATE LOW SCALE (CPS): 0
~ COUNT RATE HIGH SCALE (CPS): 24000
TOOL STANDOFF (IN):
REMARKS: Thank you for using Schlumberger
This log was depth referenced to a BHC Western Atlas log,
dated 14-Nov-1994
Matrix = Sandstone
Pumped a total of 300 BBLS of crude at a rate of
0.25 BPM while logging.
THIS FILE CONTAINS THE RAW DATA FOR PASS #1.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
..............................
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 76
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 13
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX)
DEPT FT 1022548 O0 000 O0 0 4 1 1 4 68 0000000000
NPHI PS1 PU 1022548 O0 000 O0 0 4 1 1 4 68 0000000000
ENPH PSi PU 1022548 O0 000 O0 0 4 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1998 14:23
PAGE: 20
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
TNPH PS1 PU 1022548 O0 000 O0 0 4 1 1 4 68 0000000000
TNRA PS1 1022548 O0 000 O0 0 4 1 1 4 68 0000000000
RTNR PS1 1022548 O0 000 O0 0 4 1 1 4 68 0000000000
ENRA PS1 1022548 O0 000 O0 0 4 1 1 4 68 0000000000
CFEC PS1 CPS 1022548 O0 000 O0 0 4 1 1 4 68 0000000000
CNEC PS1 CPS 1022548 O0 000 O0 0 4 1 1 4 68 0000000000
RCEF PS1 CPS 1022548 O0 000 O0 0 4 1 1 4 68 0000000000
RCENPS1 CPS 1022548 O0 000 O0 0 4 1 1 4 68 0000000000
RCNTPS1 CPS 1022548 O0 000 O0 0 4 1 1 4 68 0000000000
RCFT PS1 CPS 1022548 O0 000 O0 0 4 1 1 4 68 0000000000
CNTC PS1 CPS 1022548 O0 000 O0 0 4 1 1 4 68 0000000000
CFTC PSI CPS 1022548 O0 000 O0 0 4 1 1 4 68 0000000000
NPOR PS1 PU 1022548 O0 000 O0 0 4 1 1 4 68 0000000000
GR PS1 GAPI 1022548 O0 000 O0 0 4 1 1 4 68 0000000000
TENS PS1 LB 1022548 O0 000 O0 0 4 1 1 4 68 0000000000
CCL PS1 V 1022548 O0 000 O0 0 4 1 1 4 68 0000000000
** DATA **
DEPT. 11154.500 NPHI.PS1 48.588 ENPH. PS1 55.854 TNPH. PS1
TNRA.PS1 4.068 RTNR.PS1 4.250 ENRA.PS1 6.884 CFEC. PS1
CNEC. PS1 3033.481 RCEF. PS1 376.809 RCEN. PS1 2575.992 RCNT. PS1
RCFT. PS1 503.221 CNTC.PS1 2149.132 CFTC. PSi 537.722 NPOR.PS1
GR.PS1 43.163 TENS.PSi -2.000 CCL.PS1 -0.029
DEPT. 10380.000 NPHI.PS1 9.925 ENPH. PS1 15.972 TNPH. PS1
TNRA.PS1 1.747 RTNR.PS1 1.864 ENRA.PS1 3.051 CFEC. PS1
CNEC. PS1 3295.619 RCEF. PS1 892.169 RCEN. PS1 2914.948 RCNT. PS1
RCFT. PS1 1713.674 CNTC. PS1 3207.988 CFTC.PSi 1839.934 NPOR.PS1
GR.PS1 16.146 TENS. PSi -4.000 CCL.PS1 -999.250
45.987
440.635
2179.655
45.987
11.883
1080.151
3264.490
11.806
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .004
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/03/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-~-1998 14:23
PAGE:
21
**** FILE HEADER ****
FILE NAME : EDIT .005
SERVICE : FLIC
VERSION : O01CO1
DATE : 98/03/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE1VUMBER 5
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS NUMBER: 2
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
CNTG 11151.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (?T) :
LOGGING SPEED (FPHR) :
DEPTH CONTROL USED (YES/NO) :
STOP DEPTH
10367.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
GR GAMmlA RAY
CNTG COMPENSATED NEUTRON
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
LOGGERS CASING DEPTH (FT) :
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
25-NOV-97
8C0-069
1613 25-NOV-97
11100.0
10370.0
11141.0
TOOL NUMBER
SGC-SA 404
CNT-G
9.875
11198.0
Produced Fluids
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1998 14:23
PAGE:
22
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
EPITHERMAL
SANDSTONE
2.65
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT) :
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS): 6400
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 24000
TOOL STANDOFF (IN):
REMARKS: Thank you for using Schlumberger
This log was depth referenced to a BHC Western Atlas log,
dated 14-Nov-1994
Matrix = Sandstone
Pumped a total of 300 BBLS of crude at a rate of
0.25 BPM while logging.
THIS FILE CO1TTAINS THE RAW DATA FOR PASS #2.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 76
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 13
12 68
13 66 0
14 65 FT
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1998 14:23
PAGE:
23
TYPE REPR CODE VALUE
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 1022548 O0 000 O0 0 5 1 1 4 68 0000000000
NPHI PS2 PU 1022548 O0 000 O0 0 5 1 1 4 68 0000000000
ENPH PS2 PU 1022548 O0 000 O0 0 5 1 1 4 68 0000000000
TNPH PS2 PU 1022548 O0 000 O0 0 5 1 1 4 68 0000000000
TNRA PS2 1022548 O0 000 O0 0 5 1 1 4 68 0000000000
RTNR PS2 1022548 O0 000 O0 0 5 1 1 4 68 0000000000
ENRA PS2 1022548 O0 000 O0 0 5 1 1 4 68 0000000000
CFEC PS2 CPS 1022548 O0 000 O0 0 5 1 1 4 68 0000000000
CNEC PS2 CPS 1022548 O0 000 O0 0 5 1 1 4 68 0000000000
RCEF PS2 CPS 1022548 O0 000 O0 0 5 1 1 4 68 0000000000
RCENPS2 CPS 1022548 O0 000 O0 0 5 1 1 4 68 0000000000
RCNT PS2 CPS 1022548 O0 000 O0 0 5 1 1 4 68 0000000000
RCFT PS2 CPS 1022548 O0 000 O0 0 5 1 1 4 68 0000000000
CNTC PS2 CPS 1022548 O0 000 O0 0 5 1 1 4 68 0000000000
CFTC PS2 CPS 1022548 O0 000 O0 0 5 1 1 4 68 0000000000
NPOR PS2 PU 1022548 O0 000 00 0 5 1 1 4 68 0000000000
GR PS2 GAPI 1022548 O0 000 O0 0 5 1 1 4 68 0000000000
TENS PS2 LB 1022548 O0 000 O0 0 5 1 1 4 68 0000000000
CCL PS2 V 1022548 O0 000 O0 0 5 1 1 4 68 0000000000
** DATA **
DEPT. 11151.500 NPHI.PS2 50.042 ENPH. PS2 24.899 TNPH. PS2
TNRA.PS2 4.148 RTNR.PS2 4.333 ENRA.PS2 4.115 CFEC. PS2
CNEC. PS2 2938.851 RCEF. PS2 610.799 RCEN. PS2 2495.633 RCNT. PS2
RCFT. PS2 365.337 CNTC.PS2 1583.128 CFTC.PS2 390.385 NPOR.PS2
GR.PS2 53.814 TENS.PS2 -4.000 CCL.PS2 -0.089
DEPT. 10367.500 NPHI.PS2 13.155 ENPH. PS2 18.770 TNPH. PS2
TNRA.PS2 2.003 RTNR.PS2 2.000 ENRA.PS2 3.400 CFEC. PS2
CNEC. PS2 2945.389 RCEF.PS2 755.324 RCEN. PS2 2565.547 RCNT. PS2
RCFT. PS2 1185.664 CNTC.PS2 2519.666 CFTC.PS2 1286.746 NPOR.PS2
GR.PS2 20.687 TENS.PS2 -2.000 CCL.PS2 -999.250
46. 995
714. 261
1605. 612
46. 995
14.754
866.384
2625.757
14.076
END OF DATA **
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
24-MAR-1998 14:23
PAGE:
24
**** FILE TRAILER ****
FILE NAME : EDIT .005
SERVICE · FLIC
VERSION . OOiCO1
DATE · 98/03/24
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE : 98/03/24
ORIGIN : FLIC
TAPE NAME : 98133
CONTINUATION # : 1
PREVIOUS TAPE :
CON~zENT : ARCO ALASKA INC., PRUDHOE BAY, D.S. 11-34, API# 50-029-22516-00
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE : 98/03/24
ORIGIN · FLIC
REEL NAME : 98133
CONTINUATION # :
PREVIOUS REEL :
COMMENT : ARCO ALASKA INC., PRUDHOE BAY, D.S. 11-34, API# 50-029-22516-00