Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout195-022THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE JANUARY 03, 2001 M ATE IA L U N D ER TH IS M ARK ER C:LORBMFILM.DOC TONY KNOWLE$, GOVERNOI~ ~LASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 November 20, 2000 Mr. Fritz Gunkle SSD Drilling Manager BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612 Dear Mr. Gunkle, Re: Administrative Abandonment Action Pmdhoe Bay Unit P-12A Permit # 195-022 Well P-12A was replaced by P-12B (permit # 200-133, API# 50-029-22136-02) when the permit was approved 8/29/2000. The replacement well incorporates an extension to a new bottom hole location using the existing well bore. The extension, along with the original hole, will be used for production of hydrocarbons. A review of both well files indicates administrative abandonment of the originating well bore is appropriate according to current AOGCC procedures for wells where additional permitted extension are drilled from an existing well bore. 20 AAC 25.005(a) requires a Permit to Drill for each hole drilled below the conductor unless drilled to straighten the original hole, sidetrack junk, or correct mechanical difficulties. In addition, AOGCC data bases require each conductor has only one permit number and AP1 number. Administrative abandonment of the original permit only eliminates duplication in the databases. Information for the original well and its replacement will be maintained in their respective files. Please notify other cognizant personnel in your organization so that the well will be correctly identified on subsequent reports and applications submitted to the Commission. Sincerely, Steve McMains Statistical Technician AOGCC cc: Gary Benson Terri Hubble Memorandum State of Alaska Oil and Gas Conservation Commission To: Well File: Prudhoe Bay Unit P-12A Permit # 195-022 November 20, 2000 Re~ Administrative Abandonment Action Prudhoe Bay Unit P-12A Permit # 195-022 This memo will remain at the front of the subject well file. Well P-12A was replaced by P-12B (permit # 200-133, APl # 50-029-22136-02) when the permit was approved 8/29/2000. The replacement well incorporates an extension to a new bottom hole location using the existing well bore. This extension, along with the original hole, will be used for production of hydrocarbons. A review of both well files indicates administrative abandonment of the originating well bore is appropriate according to current AOGCC procedures for wells where additional permitted extension is drilled from an existing well bore. 20 AAC 25.005(a) requires a Permit to Drill for each hole drilled below the conductor unless drilled to straighten the original hole, sidetrack junk, or correct mechanical difficulties. In addition, AOGCC data bases require each conductor has only one permit number and API number. Administrative abandonment of the original permit only eliminates duplication in the databases. Information for the original well and its replacement will be maintained in their respective files. The operator has been notified of this action. All future correspondence with the AOGCC should reflect the new permit number, AP1 number and well data. Statistical Techniciml..'Lg4x-CA ~ ~c4 / [~ Reservoir Engineer Petroleum Geologist ~jfmmissioner ....... STATE OF ALASKA -~-~ ALAS~. .~ AND GAS CONSERVATION CON .... 31ON WELL COMPLETION OR RECOMPLETION REPORT AND LOG Administrative Abandonment 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned [] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska) Inc. 195-022 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22136-01 4. Location of well at surface ' __t'¢"~'~"~._._%'-~._ ~- 9. Unit or Lease Name 2525' NSL, 2190' EWL, SEC. 31, T11N, R13E, UM;u~,~.~lffcN3,~ Prudhoe Bay Unit At top of productive interval ' ¥~~ 2442' NSL, 3474' EWL, SEC. 31, T11N, R13E, UM , ,.'.~, 10. Well Number At total depth ~ ;~L~~ P- 12A 2430' NSL, 4530' EWL, SEC. 31, T11N, R13E, UM 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field / Prudhoe Bay Pool KBE = 86.59' ADL 028288 12. Date Spudded03/23/1995 J 13. Date T.D. Reached J 14. Date Comp., Susp., or Aband.04/08/1995 9/23/2000 J 15. Water depth, if offshoreN/A MSL J 16. No. of CompletiOnSzero 17. Total10303 Depth (MD+TVD)118'9016 FT Plug Back Depth (MD+TVD)10303 9016 FTII 19' Directi°nal Survey I 20'[] Yes ~ No Depth where SSSV setl 21' Thickness °f Permafr°stN/A MD 1900' (Approx.) 22. Type Electdc or Other Logs Run GR/RES/NEU / DEN 23. CASING, LINER AND CEMENTING RECORD CASING SE'I-rING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.5# H-40 Surface 110' 30" 260 sx Arctic Set (Approx.) 10-3/4" 45.5# NT-80 Surface 2696' 13-1/2" 3392 cu ft Permafrost 7-5/8" 29.7# L-80 Surface 7012' 9-7/8" 1474 cu ft Class 'G' 5-1/2" 17# L-80 6864' 9375' 6-3/4" 155 sx Class'G' 3-1/2" 9.3# L-80 9289' 10303' 4-3/4" Uncemented Slotted Liner 24. Perforations op. en to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) See P-12B 4-1/2", 12.6#, L-80 6864' 6816' MD -I-VD MD TVD · , .:,;.~' i~ ...... :! .~ ...... .~ ~;~'¢; ;; ...... :~ :: 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED u~'j~j ~ 5 ......... ¢ None (P-12B is a deepen of this well) 27. PRODUCTION TEST Date First Production Method o'f Operation (Flowing, gas lift, etc.) Not on Production N/A Date of Test Hours Tested PRODUCTION FOR OIL-DEL GAS-MCF WATER-DEL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-DEL GAS-MCF WATER-DEL OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate , , , Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered Marker Name Depth Depth and gravity, GOR, and time of each phase. Sag River 9066' 8866' Shublik 9085' 8882' Sadlerochit 9240' 8978' · : . , . : · 31. List of Attachments: Summary of Daily Drill'ing Reports 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Terrie Hubble ~,,,~,~_~ ~,~~ Title Technical Assistant Date P-12A 195-022 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No./Approval No. iNSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Well: P-12B Accept: 09/22/00 Field: Prudhoe Bay Spud: 09/23/00 APl' 50-029-22136-02 Release: 09/29/00 Permit: 200-133 CTD Unit: CDR1 COIL TUBING DRILLING 09/22/00 Move in, ricj up and accept rig. Nipple up BOP stack and test. Witnessed waived by AOGCC inspector Lou Grimaldi. O9~23~0O Make up and run BHA #1. Set down at 10047' ctm. Pull out of hole for mill. Run BHA #2 with 2.8" Crayola mill. Ream 9723' and 10060'. 09/24/00 Ream at 10060'. Drift to 10334' (corrected) Log tie in. Pull out of hole for bit. Run BHA #3. Drill from 10332' to 10599'. Pull out of hole for orienter. Run BHA #4. 09~25~00 Drill from 10599' to 11264'. Pull out of hole for motor. Make up BHA #5. Run in hole. O9~26~0O Drill from 11264' to 11374'. Pull out of hole for chunked motor. Run in hole with BHA #6. Drill from 11374' to 11482'. 09/27/00 Drill from 11482' to 11821' (TD). Drift hole. Lay in new Flopro. Log tie-in. Pull out of hole for log. O9~28~OO Log open hole with memory induction. Run in hole with drilling BHA, condition hole for liner. 09~29~00 Make up 56 joints of 2-3/8" FL4S pre-drilled liner. Run in hole, no shear. Pull out of hole with liner. 09~30~00 Liner at surface. Redress LBRT. Run in hole to TD, release liner. Pull out of hole, displacing to KCI. Freeze protect upper 2500' with MeOH. Nipple down and release rig. STATE OF ALASKA ALAS_F~-OIL AND GAS CONSERVATION COMMISSIC REPORT ._ _ SUNDRY WELL OPE .,. TIONS 1. Operations performed: Operation shutdown~ Stimulate Plugging__ Pull tubing__ Alter casing __ Repair well__ Perforate x Other__ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612. Anchora_oe, Alaska 99519-6612 4. Location of well at surface 2525' NSL, 2190' EWL, SEC. 31, T11N, R13E At top of productive interval 2456' NSL, 3591' EWL, SEC. 31, T11N. R13E At effective depth 2850' NSL, 475' EWL, SEC. 31. T11N, R13E At total depth 2430' NSL. 4530' EWL, SEC. 31, T11N, R13E 5. Type of Well: Development ~' Exploratory ~ Stratigraphic ~ Service ~ 6. Datum elevation (DF or KB) KB = 86.59' 7. Unit or Property name Prudhoe Bay Unit feet 8. Well number P-12A 9. Permit number/approval number 95-22 / 10. APl number 50- 029-22136-01 11. Field/Pool Prudhoe Off Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural -- Conductor 110' Surface 2665' Intermediate 6981' Production -- Liner 4353' Perforation depth: measured 10303' 9016' 10303' 9016' Size feet Plugs (measured) feet feet Junk (measured) feet Cemented 260 sx Arcitcset 3392 cuft Permafrost 1474 cu fl Class "G" 20" 10-3/4" 7-5/8" 5-1/2" 155 sx Class "G" 9360'-9674', 9710'- 10023', 10060'- 10281' true vertical subsea 9003'-9006', 9006'-9011', 9012'-9015' Measured depth 141 2696 7012 6864-9375 True vertical depth BKB 141 2696 6891 6756-9005 Tubing (size, grade, and measured depth) 4-1/2", L-80 to 6852' Packers and SSSV (type and measured depth)Packer @ 6816' SSSV @ 2198' RECE!VED 13. Stimulation or cement squeeze summan~ee Attachment Intervals treated (measured) Treatment description including volumes used and final pressure Gas Cons. 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 320 662 11 0 314 707 30 0 Tubing Pressure 280 255 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations OilX Gas Suspended 17. I hereby certify that th~,/foregoin, g i~,trtue and correct to the best of my knowledge. Sign ..... .,,_..,, Title TechnicalAssistantlll Service Form 10-404 Rev 06/15/88 D SUBMIT IN DUPLICATE P-12A DESCRIPTION OF WORK COMPLETED ADDPERF O2/28/98 SUMMARY The following additional interval were perforated using 2 1/2" guns, 6 SPF, random orientation and 60° phasing. 9336'- 9350' MD 9280'- 9304' MD The following additional interval were perforated using 2 7/8" guns, 6 SPF, random orientation and 60° phasing. 9242'- 9268' MD F' E R H I T 9.5 022 685'i 95'" 0"22 6859 95 .... 0"22 6853 95---022 BHC ..... A'Z./GR 95 .... (},~o...-.~. ~. Pr'L/',...., FINAL 95 ...... C) 22 Ci4/GR FINAL 95 -, 022 D Z L F/',3 R/" S F' · 95, .... 022 FkIT/GR FINAL ,:~ 0 o 2 N G F' r~.. 95 "- 0 '~ 2 N G F' z,, .~, 9B .... 022 ROF'/'NGP 95, ..... 022 ROP/NGP 95--~ 022 SS VD J' ,:i:i ,}.j c: ' I I) ,:.., 'L e; J 2 .,," () 1/' 96 5-- 6 Ar'e dr'y d'i'tch samp'ies Was 't he we'J i cor'ed? I:D I:R I !_1,.. I AJ ~ ~E R~/! r" EEi WELL LOG TRANSMITTAL To: State of Alaska F~// October 12, 1995 Alaska Oil and Gas Conservation Comm. Attn: Larry Grant 3001 Porcupine Drive Anchorage, Alaska 99501 RE: MWD Formation Evaluation Logs - P-12A, P-12APB1 & P-12APB2 AK-MW-50020 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 P-12A; 1 LDWG formated LIS tape with verification listings. API#: 50-029-22136-00 P-12A PBI: 1 LDWG formated LIS tape with verification listings. API#: 50-029-22136-70 P-12A PB2; 1 LDWG formated LIS tape with verification listings. API~: 50-029-22136-71 Oil & .3as Cons. 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company · ' STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMP LETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number BP Exploration -~) ii-'.~ ? 8~A95'22 3. Address Number ~ t ~F ~ 0'? 0r29.-22~, 136-01 4. Location of well at surface _ '~-~'. :Urlit~ c~r"Le~se Name 2525'NSL, 2190' EWL, SEC. 31, TIIN, R13E ~ -" :. "" i~~' Pr~h'~e/_/~_ay' 'J '/ Unit 0. e,,,um er P-12A 2456' NSL, 3591' EWL, SEC. 31, T11N, R13E~," ' 11. Field and Pool At Total Depth /~,,~r/~_. Prudhoe Bay Field/Prudhoe Bay Pool 2430' NSL, 4530' EWL, SEC. 31, T11N, R13E 5. Elevation in feet (indicate KB, DF, etc.) J6. Lease Designation and Sedal No. KBE = 86.59' I ADL 28288 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions I 3/23/95 4/8/95 4/10/95 N/A feet MSL I One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVDI 19. Directional Survey [20. Depth where SSSV set 21. Thickness of Permafrost 10303'MD/9016' TVD 10303'MD/9016' TVD YES [] NO []I 2198 feet MD 1900' (Approx.) 22. Type Electric or Other Logs Run GR/RES/NEU/DEN 23. CASING, UNER AND CEMENTING RECORD SE'I-FING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZ]5 CEMEN~NG RECORD AMOUNT PULLED 20" 91.5# H-40 Surface 110' 30" 260 sx Arcitcset (Approx.)' 10-3/4" 45. 5# NT-80 Surface 2696' 13-1/2" 3392 cu fl Permafrost 7-5/8" 29. 7# L-80 Surface 7012' 9-7/8" 1474 cuft Class "G" 5-1/2" 17# L-80 6864' 93 75' 6-3/4" 155 sx Class "G" 3-1/2" 9. 3# L-80 9289' 10303' 4-3/4" Uncemented slotted liner 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) Slotted liner 4-1/2", L-80 6852' 6816' MD TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9360'- 9674' 9003'- 9006' 9710'- 10023' 9006'- 9011' 10060'- 10281' 9012'- 9015' 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas litt, etc.) April23, 1995 I Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS~MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO TEST PERIOD ~ Flow Tubing Casing Pressure CALCULATED=~. OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE =~ 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. . _ . [<,. oCT 0 6 1995 Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag River 9066' 8867' Shublik . 9085' 8882' Sadlerochit 9240' 8978' 31. LIST OF A-I-FACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ....... (...) Title Senior Drilling Engineer Date /~' ~--/'~ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". -- ~ ~.., L. ~ w ~ 0CT 0 6 1995 A~s~,~ u~t & G~s Cons. Anch0rag~ Form 10-407 BP/AAI SHARED, SERVICE DAILY OPERATION~ PAGE: 1 WELL: P-12A BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 03/19/95 12:00 SPUD: RELEASE: 04/10/95 09:30 OPERATION: DRLG RIG: NABORS 28E WO/C RIG: NABORS 28E 03/19/95 ( 1) TD: 0'( 0) 03/20/95 (2) TD: 7315' (7315) 03/21/95 (3) TD: 7250' ( 0) 03/22/95 ( 4) TD: 7061 PB: 0 MIRU MW: 0.0 VIS: 0 RIG DOWN. BLOW DOWN. MOVE MUD PITS RIG OFF P-05, MOVE AROUND CORNER. SPOT RIG, MUD PITS OVER P-12A. TESTING BOPE MW: 0.0 VIS: 0 SPOT PITS. R/U FLOOR, NEW SECTION STANDPIPE. RIG ACCEPTED @ 1200 HRS ON 03/19/95. CUT AND SLIP DRLG LINE. TEST 7 5/8" PACKOFF, OK. R/U DSM. PULL CAMERON 4" BPV. RIG UP. DISPLACE WELL TO SEAWATER. TUBING CUT @ 7315'. INSTALL TWC. TEST BACKSIDE, OK. N/D TREE AND ADAPTER FLANGE. TESTING BOPE. PULLED DP IN STANDS MW: 0.0 VIS: 0 TEST ENTIRE BOPE STACK. 2- 3 INCHES CLEARANCE SO ABLE TO TEST BOTTOM RAMS. R/U TO PULL 4 1/2" TUBING. R/U TO PULL 4 1/2" TUBING. R/U LUB. PULL TWC. R/D LUB. M/U LANDING JT. PULL TUBING HANGER TO FLOOR. L/D TUBING HANGER. L/D 181 JTS TBG, 2 GLM'S, 1 SSSV, 4 PUP JTS = 28.77', CUT OFF JT = 18.6', 26 LA SALLE CLAMPS, 2 STEEL BANDS. CLEAR FLOOR, PIPE SHED. INSTALL WEAR RING. RIH W/ 7 5/8" BRIDGE PLUG. P/U AND RIH WITH 3-1/2" DP. CIRC AND SET HALLIBURTON 7 5/8" EZ DRILL BRIDGE PLUG AT 7250' BRIDGE PLUG SET. TEST 7 5/8" CASING, OK. DISPLACE SEAWATER TO MILLING FLUID. SPOT 18 PPG PILL ON BOTTOM. CBU @7061 MW: 0.0 PULLED DP IN STANDS T/O'. POOH W/BRIDGE PLUG SETTING TOOL. PU 6-3/4" GUIDE SHOE. 6100 SERIES SECTION MILL, JETTED TOP SUB, 6 DC'S & 15 HWDP. RIH T/3100. REPAIR THE DRAWWORKS LINE. BECAUSE IT WAS NOT SPOOLING CORRECTLY. SECTION MILL RUN 7-5/8" NT 95HS CASING T/KO DEPTH @7012. SECTION MILL CASING F/7012 T/7033. CLEAR FLOWLINE OF METAL DEBRIS. SECTION MILL CASG T/7051. CIRC. STARTED GETTING CMT BACK. PACKING OFF AT TOP OF MILLED SECTION. WORK THRU TOP, FREE UP, CIRC OK. NO OBSTRUCTIONS FOUND ELSEWHERE. OBTAINED BTTMS UP. 100% ANNULUS VOL. CUT CASING F/7051 T/7061 (49' WINDOW CUT.) CIRC @7061 CBU. WORK OBSTRUCTION FREE @ TOP OF MILLED SECTION. CIRC. 0C~ 0 ~ 1995 WELL : P-t2A OPERATION: RIG : NABORS 28E PAGE: 2 03/23/95 (5) TD: 7020' ( 0) 03/24/95 (6) TD: 7663'( 643) DRLG CEMENT @ 7020' MW: 0.0 VIS: 0 CIRCULATE @ 7061'· OBTAINED BOTTOMS UP. POH. PULLED BHA. BHA LAID OUT. RIH TO 7112'. M/U MULE SHOE. CIRCULATE @ 7112'. OBTAINED CLEAN RETURNS. MIXED AND PUMPED SLURRY. PULL DRILLPIPE. PULLED 14 STDS, CIRC BOTTOMS UP. WAIT ON CEMENT. POH. LAY DOWN 42 JTS. SERVICE BOP STACK. WASH OUT STACK AND SERVICE WEAR RING. MADE UP BHA %1. RUN IN WITH HEAVEY WT FLOW TEST. RIH TO 6730'. BREAK CIRC EVERY 1500'. CIRCULATE. DRILLED CEMENT TO 7012'_ AT TOP OF NEW HOLE SECTION 7012' DRILLED CEMENT, KICKING OFF. DRILLING MW: 0.0 VIS: 0 DRILED CEMENT TO 7020'. DRILLED TO 7663' 03/25/95 (7) TD: 8050' ( 387) 03/26/95 (8) TD: 9030' ( 980) DRILLING MW: 0.0 VIS: 0 DRILLED TO 7637'. PRESSEURE CHANGED FROM 3200 PSI AND 4000 PSI. NOZZLE BLOCKED WHEN WE CHANGED OVER THE MUD THE PRESSURE INCREASED, WHILE DRILLING WE TRIED TO lin PLUG THE BIT AND ALSO TRIED TO CLEAN OUT OF THE BIT. POH TO 1078' PULLED BHA. CHECK BHA NO JETS PLUGGED, NO PROBLEMS. MADE UP BHA %2. CHANGE JETS IN BIT TO 15'S CHANGE OUT MOTOR CHANGE OUT MWD. KICK OUT 2- JTS HW, FLOW TEST MOTOR AND · , NEW MWD RIH TO 7565'_,6 BREAK CIRC EVERY 1500' PICK UP 23 JTS DP. REAMED TO 763 . PRECAUTIONARY REAM TO BOTTOM NO FILL. DRILLED TO 8050'. DRILLING BHA RUN %1. DRILLED TO 9030' MW: 0.0 VIS: 0 03/27/95 (9) TD: 9420' ( 390) 03/28/95 (10) TD: 9419' ( 0) RAN ELECTRIC LOGS MW: 0.0 VIS: 0 DRILLED TO 9154'. STARTED SCHEDULED WIPER TRIP. , CIRCULATED AT 9154 . OBTAINED BOTTOMS UP. POH TO 7000'. RIH TO 9154'. TIGHT SPOT AT 9070' REAM FROM 9070 - 9154', NO PROBLEMS. DRILLED TO 9420' POH TO 8955' RIH TO 9420' CIRCULATED. OBTAINED BOTTOMS UP. HEAVY SLUG SPOTTED DOWNHOLE. POH TO 347' STRAP OUT NO CORRECTIONS. LAY DOWN BHA. WIRELINE WORK. RAN ELECTRIC LOGS. MAKE UP BHA #3 MW: 0.0 VIS: 0 RAN ELECTRIC LOGS RUN %1. COMPLETED CALIBRATION CHECKS ON RFT RUN #2. RUN TOTAL OF 24 PRESSURE STOPS. COMPLETED LOGGING RUN WITH RFT FROM 9285 - 9049'. RIGGED DOWN LOGGING/BRAIDED CABLE EQUIPMENT. SINGLED IN DRILLPIPE TO 420' RIH TO 9419' CIRCULATED. OBTAINED BOTTOMS UP. BATCH MIXED SLURRY. SLURRY AT REQUIRED DEPTH, STOPPED THE DISPLACEMENT. PULLED DRILLPIPE IN STANDS TO 0.0'. TESTED BOP STACK. TESTED CHOKE MANIFOLD. TESTED ANNULAR PREVENTOR. PRESSURE TEST COMPLETED SUCCESSFULLY. MADE UP 'BHA %3. WELL : P-12A OPERATION: RIG : NABORS 28E PAGE: 3 03/29/95 (11) TD: 8912' ( 0) 03/30/95 (12) TD: 9167'( 255) 03/31/95 (13) TD: 9375' ( 208) 04/01/95 (14) TD: 9375' ( 0) 04/02/95 (15) TD: 9375' ( 0) DRILLING MW: 0.0 VIS: 0 RIH TO 7012'. CUT 104' DRLG LINE. CIRCULATED. OBTAINED CLEAN RETURNS. RIH TO 8290'_ BRIDGE AT 8290' WASH AND REAM TO 8600'. WASHED TO 8760'. WASH AND REAM TO TOP OF CEMENT @ 8760' HAD PACKING OF PROBLEMS F/ 858530 - 8603'. DRILLED CEMENT TO 8891'. CIRCULATED. HOLE SWEPT WITH SLUG. POH TO 287'. PULLED BHA. MADE UP BHA #4. FLOW TEST MOTOR. RIH TO 8465'. FILL DP @ SHOE. BEGAN PRECAUTIONARY MEASURES_ TOOK MWD SURVEY @ 8645' . ACCEPTABLE SURVEY OBTAINED AT 8645'. REAMED TO 8891' WASH AND REAM F/ 8840 - 8891'. DRILLED TO 8912'. DRILLING MW: 0.0 VIS: 0 DRILLED TO 9045'_ BUILD RATE UNACCEPTABLE, BHA. CIRCULATED AT 9045'. OBTAINED BOTTOMS UP. POH TO 660'. PULLED BHA. BHA STOOD BACK. CHANGE OUT MOTOR AND BIT. MADE UP BHA #5. RIH TO 9045'. DRILLED TO 9167'. BHA RUN #6 MW: 0.0 VIS: 0 DRILLED TO 9375'. CIRCULATED @ 9375'. OBTAINED BOTTOMS UP. POH TO 660'. OBSERVE WELL, PUMP DRY JOB, TWO TIGHT SPOTS @ 8710' AND 8615'. PULLED BHA. BHA LAID OUT. SERVICE WEAR RING. MADE UP BHA #6. PULLING CASING MW: 0.0 VIS: 0 RIH TO 8630'. BEGAN PRECAUTIONARY MEASURES. REAMED TO 9375'. REAM W/ HOLE OPENER F/ 8800 - 9375' CIRCULATED. OBTAINED BOTTOMS UP. POH TO 660'. OBSERVE WELL LAY DOWN 33 JTS, DROP 1.9" BUNNY DRESS TIGHT SPOT @ 8800' PULLED BHA. BHA LAID OUT. RIGGED UP CASING HANDLING EQUIPMENT. RUN CASING TO 2490' RAN DRILLPIPE IN STANDS TO 9140'. HOLE TAKING WT TRY TO BREAK CIRCULATION AT 9140'. HOLE BACKING OFF WORK 2 STANDS OUT WITH PUMP TRYING TO GET CIR @8954' MAKE UP BHA #7 MW: 0.0 VIS: 0 CIRCULATED @ 8954'. WASH TO BOTTOM HOLE BACKING OFF. CIRC AND CONDITION FOR CEMENT JOB. OBTAINED BOTTOMS UP. RIGGED UP HIGH PRESSURE LINES. BATCH SLURRY MIXED. TEST LINES. SET PACKER THAN LINER HANGER TEST BACK SIDE TO 3500 PSI, OK. RELEASE FROM PACKER AND REVERSE OUT. PULL DRILL PIPE IN STAND TO 10' NIPPLE DOWN TOP RAM. CHANGE TO 2 7/8" MADE UP BHA #7. MAKE UP 4 3/4" BHA FLOW TEST MOTOR. WELL : P-.12A OPERATION: RIG : NABORS 28E PAGE: 4 04/03/95 (16) TD: 9432' ( 57) 04/04/95 (17) TD: 9909' ( 477) 04/05/95 (18) TD: 9909' ( 0) 04/06/95 (19) TD: 9873' ( 0) 04/07/95 (20) TD:10073' ( 200) RIH TO 1000' MW: 0.0 VIS: 0 RIH TO 4800'. CUT DRILLING LINE. LINE SLIPPED AND CUT. RIH TO 6860' LD DRILL PIPE TO 840'. 27 JOINTS LAID OUT. LOGGED HOLE WITH LWD; DIRECTIONAL FROM 9071 - 9277'. TEST LINER. DRILL FLOAT COLLAR AND SHOE PLUS 10' NEWS HOLE. CIRCULATE @ 9385' CHANGE MUD SYSTEM OVER OF FLOW - PRO. OBTAINED BOTTOMS UP. DRILLED TO 9432'. MWD FAILED, CIRCULATE. TESTED MW/). MWD FAILED. POH TO 70'. PULLED BHA. BHA LAID OUT. CHANGE OUT SPERRY SUN TOOL. RIH TO 1000'. POH MW: 0.0 VIS: 0 BHA RUN #8. FUNCTIONED DOWNHOLE TOOLS AT 1000'. RIH TO 9432'. TOOK MWD SURVEY AT 9432'_ TAKE CHECK SHOT SURVEYS. ACCEPTABLE SURVEY. DRILLED TO 9909'. CIRCULATED AT 9909' OBTAINED BOTTOMS UP. PULL DRILLPIPE. POH TO 35' INSTALL BORE PROTECTOR MW: 0.0 VIS: 0 DOWLOADED MWD TOOL. MADE UP BHA #8. RIH TO 1000' SHALLOW TEST MOTOR. TESTED SMSS. RIH TO 3550' BEGAN PRECAUTIONARY MEASURES. REST HOLE AT 3550' WAIT ON ORDERS_ POH TO 283'. PULLED BHA. BHA LAID OUT. SINGLED IN DRILL PIPE TO 690'. 23 JOINTS PICKED UP. RIH TO 9909'. CIRCULATE. OBTAINED CLEAN RETURNS. BATCH MIXED SLURRY. DISPLACED SLURRY. PULL 20 STANDS DRILLPIPE. REVERSE CIRCULATE @ 8050' PULLED DRILLPIPE IN STANDS TO 0.0'. RUN IN 7 STANDS OUT OF DERRICK. RETRIEVED BORE PROTECTOR. TEST WELL CONTROL EQUIPMENT. TESTED BOP STACK. INSTALLED BORE PROTECTOR. DRILLING MW: 0.0 VIS: 0 MADE UP BHA #1. SHALLOW TEST MWD AND 1.25 DEG BH DRILLEX MUD MOTOR. MOTOR HAS 4 1/4" STABILIZER, NO JET. RIH TO 9026' PRECAUTIONARY WASH 60' TO BOTTOM. DRILL FIRM CEMENT TO 9086' TO KICK OFF POINT @ 9382' DRILLED TO 9873'. KICK OFF @ 9382'. CIRCULATE MW: 0.0 VIS: 0 DRILLED TO 9937'. CIRCULATE. OBTAINED BOTTOMS UP. OBSERVE WELL, OK, PUMP SLUG. POH TO 1300' PULLED BHA. BHA STOOD BACK. MADE UP BHA #2. 1.25 DEG BH DRILLEX MOTOR W/ 4.25" STABILIZER, NO JT, SHALLOW TEST MWD AND MOTOR, OK. RIH TO 9615'. CIRCULATE. TAG BRIDGE @ 9615', 3 STANDS OFF BOTTOM, PU KELLY WASH DOWN NO PROBLEMS. RIH TO 9937'. WASH 30' TO BOTTOM. DRILLED TO 10073'. EXPERIENCED INCREASE IN PRESSURE FROOM 2500 PSI TO 3500 PSI. UNABLE TO UNPLUG. CIRCULATE. WELL : P-12A OPERATION: RIG : NABORS 28E PAGE: 5 04/08/95 (21) TD:10303' ( 230) 04/09/95 (22) TD:10303' ( 0) 04/10/95 (23) TD:10303' ( 0) CIRCULATE MW: 0.0 VIS: 0 POH TO 0.0'. FOUND MUD MOTOR HAD FAILED, CHANGE OUT MUD MOTOR. SERVICE WEAR BUSHING. MAKE UP NEW 3.5" 1.25 DEGREE DRILLEX BH MEDIUM SPEED MOTOR WITH 4.25" STABILIZER. SHALLOW TEST MWD AND MUD MOTOR. TAG BRIDGE @ 9606'_ WASH AND REAM 9606 - 9702'. FINISH RIH. WASH AND REAM 10028 TO BOTTOM @ 10073'. HOLE PACKING OFF AND TIGHT. DRILL TO TD. PUMP LOW VIS SWEEP AND LOWER FLUID LOSS. PUMP LOW VIS SWEEP SURFACE TO SURFACE. SHORT TRIP INTO 5 1/2" LINER, 11 STANDS, RIH. NO PROBLEMS ON SHORT TRIP. CIRCULATE AND CONDITION HOLE FOR 3 1/2" SLOTTED LINER. CIRCULATE ON BOTTOM MW: 0.0 VIS: 0 CIRCULATE AT 10303'. SPOT LOW FLUID LOSS PILL ON BOTTOM. OBTAINED CLEAN RETURNS. POH TO 1300'. STAND BACK 27 STANDS OF 2 7/8" DP, LAY DOWN 36 JTS. SLM OUT OF HOLE. LAY DOWN BHA. CLEAR FLOOR, RIG TUBING TONGS AND 3 1/2" TUBING ELEVATORS. PICK UP 3 1/2" 9.3# L-80 SLOTTED LINER, CHANGE COLLAR TO SPECIAL CLEARANCE COLLARS 4.25", RUN 2 1/16" WASH PIPE, MAKE UP TIW 5.5 X 3.5" SS HORZ PACKER, BREAK CIRC. RIH WITH 3 1/2" SLOTTED LINER ON 2 7/8" AND 3 1/2" DRILL PIPE. CIRCULATE @ 5 1/2" LINER SHOE. RIH TO OPEN HOLE WITH 3 1/2" SLOTTED LINER. TAG BRIDGE @ 10000, WASH AND WORK THROUGH, CONTINUE RIH WITH LINER. TAG BOTTOM @ 10303'. DROP BALL. PREPARE TO CIRCULATE BALL DOWN . REVERSE CIRCULATE MW: 0.0 VIS: 0 CIRCULATE 3/4" BALL DOWN. TIW SS HORZ LINER HANGER. PRESSURE UP TO SET TIW SS HORZ LINER HANGER AND TEST BACKSIDE, OK. PRESSURE UP, ATTEMPT TO SHEAR RELEASE LINER HANGER RUNNING TOOL, BALL SEAT SHEARED, RUNNING TOOL NOT RELEASED, ROTATE 29 TURNS TO RIGHT AND RELEASE RUNNING TOOL, LOSS 10K STRING WT. DISPLACE FLOFRO MUD TO SEA WATER, PUMP TWO OPEN HOLE VOLUME ON OUT SIDE OF SLOTTED LINER, POH 70' DISPLACE ENTIRE HOLE VOLUME TO SEAWATER. SPOT BLEACH BREAKER IN SLOTTED LINER, POH TO 9200', CIRCULATE TO CLEAN SEAWATER. POH LAY DOWN 3 1/2" AND 2 7/8" DRILL PIPE. LAY DOWN 2 1/16" WASH STRING. CHANGE TOP RAMS 2 7/8" TO VARIABLE RAMS, PULL WEAR BUSHING, TEST DOOR, CLEAR FLOOR. RIG UP TUBING TONGS. RUN 161 JTS 4 1/2" 12.6# L-80 NSCT COMPLETION. SPACE OUT TUBING STRING WITH 9.72' PUP JT, MAKE UP FMC 10 X 4 1/2" TUBING HANGER. PREPARE TO REVERSE CIRCUALTE AND ADD CORROSION INHIBITOR. WELL : P-~12A OPERATION: RIG : NABORS 28E PAGE: 6 04/11/95 (24) TD:10303' ( 0) RELEASE RIG MW: 0.0 VIS: 0 FINISH MAKING UP FMC 10 X 4 1/2" 5000# TUBING HANGER, TEST CONTROL LINES, OK. REVERSE CIRCULATE AND ADD 25 GAL/100 BBL COREXIT CORROSION INHIBITOR. DROP 2 1/4" BALL AND ROD, LAND TUBING STRING. PRESSURE TUBING SET PACKER AND TEST TUBING, TEST ANNULUS SHEAR RP VALVE, SET BPV AND TEST BPV. PACKER SET AT 6813'. RIGGED DOWN BOP STACK INSTALLED XMAS TREE. N/U FMC 11" 5000# X 4 1/16" 5006# TUBING SPOOL ADAPTOR AND COOPER OIL TOOL 4 1/16" 5000# NEW TREE. PULL BPV WITH DRILL SITE MAINTENANCE LUBRICATOR. SET TWO WAY CHECK VALVE, SHELL TEST TREE, OK. TEST TUBING HANGER PACK OFF, OK. PULL TWO WAY CHECK VALVE WITH LUBRICAOTR. RIG DOWN TEST PUMP, RIG UP AND FREEZE PROTECT WITH 100 BBL DIESEL, ALLOW DIESEL TO U-TUBE. SET BPV, TEST BPV. SECURE WELL. RELEASE RIG @ 2130 HRS 04/10/95. SIGNATURE: (drilling superintendent) DATE: SL_.,RY-SUN DRILLING SERVICES AlqCHORAGE ALASKA PAGE 1 SHARED SERVICES DRILLING PBY/P-12A 500292213601 NORTH SLOPE BOROUGH COMPUTATION DATE: 5/16/9 TRUE SUB-SEA COURS COURSE MEASD VERTICAL VERTICAL INCLN DIRECTION DEPTH DEPTH DEPTH DG MN DEGREES 9352 9002.80 8916.21 9374 9004.12 8917.53 9405 9005.34 8918.75 9436 9006.03 8919.44 9468 9006.70 8920.11 85 54 N 80.3 87 0 N 81.2 88 30 N 82.2 89 0 N 85.9 88 35 N 84.1 DATE OF SURVEY:__040895 MWD SURVEY JOB NUMBER: AKK-~[~,G~ , KELLY BUSHING OPERATOR: BP DLS TOTAL RECTANGULAR COORDINATES VERT. DG/100 NORTH/SOUTH EAST/WEST SECT. 0 E .00 70.13S 1393.11E 1394.29 0 E 6.67 66.71S 1414.08E 1415.18 0 E 5.78 62.22S 1444.92E 1445.91 0 E 11.92 58.97S 1476.06E 1476.98 0 E 5.76 56.18S 1507.92E 1508.78 9499 9006.78 8920.19 9532 9006.03 8919.44 9564 9005.22 8918.63 9596 9004.60 8918.01 9629 9004.74 8918.15 91 5 N 85.4 91 30 N 88.1 91 24 N 87.3 90 48 N 88.6 88 41 S 89.6 0 E 9.02 .. 53.33S 1539.02E 1539.80 0 E 8.29 51.46S 1571.88E 1572.62 0 E 2.51 50.17S 1604.02E 1604.72 0 E 4.46 49.02S 1636.11E 1636.78 0 E 8.52 48.74S 1668.55E 1669.21 9659 9005.48 8918.89 9680 9006.06 8919.47 9695 9006.38 8919.79 9710 9006.43 8919.84 9725 9006.30 8919.71 88 30 S 89.1 88 18 S 89.7 89 18 S 88.7 90 18 N 88.8 90 41 N 89.4 0 E 1.78 49.08S 1698.69E 1699.35 0 E 3.06 49.30S 1719.36E 1720.02 0 E 9.19 49.51S 1734.74E 1735.40 0 E 18.14 49.52S 1749.57E 1750.23 0 E 4.82 49.29S 1764.53E 1765.18 9741 9006.13 8919.54 9757 9006.17 8919.58 9775 9006.51 8919.92 9790 9006.91 8920.32 9805 9007.39 8920.80 9821 9007.77 8921.18 9840 9007.88 8921.29 9853 9007.88 8921.29 9872 9007.90 8921.31 9886 9007.88 8921.29 90 30 N 90.0 89 11 S 89.2 88 35 S 89.2 88 18 S 89.2 88 11 S 89.3 89 5 S 87.2 90 11 S 87.4 89 48 S 87.7 9O 5 S 86.0 9O 5 S 85.4 0 E 3.91 49.20S 1780.70E 1781.34 0 E 9.39 49.32S 1796.95E 1797.59 0 E 3.44 49.56S 1814.40E 1815.05 0 E 2.02 49.77S 1829.23E 1829.87 0 E .90 49.97S 1844.91E 1845.55 0 E 14.22 50.46S 1860.95E 1861.61 0 E 5.86 51.36S 1880.00E 1880.67 0 E 3.95 51.90S 1892.64E 1893.31 0 E 8.95 52.96S 1911.89E 1912.58 0 E 4.41 53.98S 1925.45E 1926.16 9894 9007.84 8921.25 9922 9007.84 8921.25 9954 9008.39 8921.80 9972 9009.02 8922.43 9986 9009.61 8923.02 10004 9010.32 8923.73 10021 9010.89 8924.30 10050 9011.74 8925.15 10068 9012.28 8925.69 10084 9012.68 8926.09 90 30 S 85.8 89 30 S 84.0 88 30 S 85.4 87 35 S 85.1 87 35 S 83.0 87 54 S 83.2 88 11 S 84.5 88 24 S 84.1 88 18 S 84.2 88 48 S 84.0 0 E 7.33 54.57S 1933.15E 1933.87 0 E 7.31 57.08S 1961.19E 1961.96 0 E 5.42 60.01S 1992.81E 1993.63 0 E 5.13 61.54S 2011.22E 2012.08 0 E 14.82 63.01S 2025.29E 2026.17 0 E 1.99 65.18S 2043.25E 2044.17 0 E 7.94 66.98S 2059.94E 2060.90 0 E 1.56 69.82S 2088.43E 2089.45 0 E .76 71.72S 2106.97E 2108.02 0 E 3.39 73.35S 2122.75E 2123.83 S~_.~RY-SUN DRILLING SERVICES ANCHOR_AGE ALASKA PAGE SHARED SERVICES DRILLING PBY/P-12A 500292213601 NORTH SLOPE BOROUGH COMPUTATION DATE: 5/16/9 DATE OF SURVEY: 040895 MWD SURVEY JOB NUMBER: AK-MW-50020 KELLY BUSHING ELEV. = 86.59 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 10103 9012.92 8926.33 89 41 S 84.60 E 5.85 75.19S 2141.15E 10115 9012.99 8926.40 89 41 S 84.80 E 1.65 76.31S 2153.23E 10149 9013.64 8927.05 88 5 S 84.60 E 4.76 79.44S 2186.95E 10178 9014.37 8927.78 89 0 S 82.70 E 7.25 82.64S 2215.75E 10196 9014.76 8928.17 88 35 S 83.70 E 5.85 84.82S 2234.03E 2142.26 2154.37 2188.14 2217.00 2235.33 10211 9015.05 8928.46 89 5 S 84.00 E 3.99 86.39S 2248.57E 10244 9015.28 8928.69 90 5 S 85.50 E 5.51 89.38S 2281.14E 10250 9015.29 8928.70 89 41 S 84.70 E 13.45 89.95S 2287.77E 10303 9015.56 8928.97 89 41 S 84.70 E .04 94.78S 2339.81E 2249.90 2282.53 2289.17 2341.30 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 2341.73 FEET AT SOUTH 87 DEG. 40 MIN. EAST AT MD = 10303 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 91.22 DEG. S~.<RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 3 SHARED SERVICES DRILLING PBY/P-12A 500292213601 NORTH SLOPE BOROUGH COMPUTATION DATE: 5/16/95 DATE OF SURVEY: 040895 JOB NUMBER: AK-MW-50020 KELLY BUSHING ELEV. = 86.59 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 9352 9002.80 8916.21 70.13 S 1393.11 E 349.91 10303 9015.56 8928.97 94.78 S 2339.81 E 1287.44 937.53 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. S~~RRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 4 SHARED SERVICES DRILLING PBY/P-12A 500292213601 NORTH SLOPE BOROUGH COMPUTATION DATE: 5/16/95 DATE OF SURVEY: 040895 JOB NUMBER: AK-MW-50020 KELLY BUSHING ELEV. = 86.59 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 9352 9002.80 8916.21 10303 9015.56 8928.97 70.13 S 1393.11 E 349.91 94.78 S 2339.81 E 1287.44 937.53 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS SPm~<RY-SUN DRILLING SERVICES ANCHOR_AGE ALASKA PAGE SHARED SERVICES DRILLING PBU/P-12AST 500292213670 NORTH SLOPE BOROUGH COMPUTATION DATE: 5/16/9 DATE OF SURVEY: 040495 MWD SURVEY JOB NLTMBER: A~?MW-15©020 ~ OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS COURSE DLS TOTAL INCLN DIRECTION RECTANGULAR COORDINATES VERT. DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT. 8741 8562.92 8476.33 8834 8653.88 8567.29 8859 8677.48 8590.89 8890 8707.26 8620.67 8924 8740.29 8653.70 12 41 N 88.30 E .00 48.63S 1049.61E 1050.41 13 23 S 87.70 E 1.22 48.76S 1070.68E 1071.47 14 53 S 80.00 E 9.88 49.42S 1076.58E 1077.39 16 23 S 77.30 E 5.39 51.07S 1084.75E 1085.60 20 0 S 75.30 E 10.50 53.66S 1095.30E 1096.20 8956 8769.19 8682.60 8989 8799.38 8712.79 9020 8826.79 8740.20 9050 8853.15 8766.56 9082 8879.90 8793.31 23 30 S 75.70 E 11.26 56.54S 1106.46E 1107.42 26 0 S 75.20 E 7.55 60.04S 1119.93E 1120.96 28 23 S 72.20 E 8.97 64.01S 1133.45E 1134.55 31 42 S 68.10 E 12.76 69.21S 1147.77E 1148.98 35 47 S 74.80 E 17.20 74.83S 1164.71E 1166.04 9114 8905.00 8818.41 9146 8927.67 8841.08 9178 8947.87 8861.28 9211 8965.58 8878.99 9243 8979.28 8892.69 41 35 S 81.00 E 21.67 78.97S 1184.35E 1185.76 47 54 S 85.10 E 21.69 81.65S 1206.66E 1208.12 54 12 S 88.60 E 21.35 82.98S 1231.59E 1233.08 60 47 N 90.00 E 20.32 83.31S 1259.39E 1260.88 67 41 N 88.30 E 22.41 82.88S 1287.78E 1289.25 9258 8984.51 8897.92 9275 8989.72 8903.13 9290 8993.37 8906.78 9309 8997.31 8910.72 9323 8999.52 8912.93 70 54 N 87.00 E 23.10 82.31S 1301.63E 1303.09 74 5 N 85.60 E 20.02 81.24S 1318.11E 1319.54 76 48 N 84.30 E 20.50 80.00S 1332.12E 1333.52 79 48 N 81.60 E 20.58 77.66S 1351.00E 1352.34 81 24 N 79.00 E 22.38 75.42S 1364.13E 1365.43 9352 9002.80 8916.21 9374 9004.12 8917.53 9393 9005.21 8918.62 9423 9006.98 8920.39 9455 9008.41 8921.82 85 54 N 80.30 E 15.79 70.13S 1393.11E 1394.29 87 0 N 81.20 E 6.67 66.71S 1414.08E 1415.18 86 24 N 82.00 E 5.24 63.93S 1432.91E 1433.94 87 0 N 83.90 E 6.48 60.17S 1463.32E 1464.27 87 48 N 84.20 E 2.71 56.90S 1494.66E 1495.53 9486 9009.09 8922.50 9517 9009.34 8922.75 9551 9009.77 8923.18 9583 9010.02 8923.43 9613 9009.51 8922.92 89 41 N 84.00 E 6.18 53.73S 1525.37E 1526.17 89 24 N 85.00 E 3.28 50.68S 1557.01E 1557.74 89 5 N 86.20 E 3.71 48.12S 1590.28E 1590.94 90 0 N 86.10 E 2.85 45.99S 1621.96E 1622.57 91 54 N 87.90 E 8.57 44.39S 1652.46E 1653.03 9644 9008.71 8922.12 9676 9008.63 8922.04 9697 9009.46 8922.87 9709 9010.35 8923.76 9728 9012.08 8925.49 91 5 N 89.00 E 4.44 89 11 N 87.90 E 6.74 86 18 N 88.80 E 14.37 85 5 N 89.10 E 10.39 84 5 N 89.70 E 6.33 43.57S 1683.03E 1683.58 42.69S 1715.59E 1716.11 42.08S 1736.69E 1737.19 41.86S 1748.55E 1749.05 41.67S 1766.87E 1767.36 Date 0 6 ' 995 N~$~ 0il & Gas Cons. Commis$~o~ AnChorage SP,-,~<RY-SLIN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/P-12AST 500292213670 NORTH SLOPE BOROUGH COMPUTATI ON DATE: 5 / 16 / 9 DATE OF SURVEY: 040495 MWD SURVEY JOB NUMBER: AK-MW-50020 KELLY BUSHING ELEV. = 86.59 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 9739 9013.30 8926.71 83 54 9772 9016.87 8930.28 83 41 9790 9018.71 8932.12 84 30 9803 9019.90 8933.31 84 54 9836 9022.37 8935.78 86 24 S 89.10 E 10.35 41.73S 1778.50E 1778.98 S 89.20 E .68 42.22S 1811.31E 1811.80 N 90.00 E 6.29 42.34S 1829.16E 1829.65 N 89.80 E 3.47 42.32S 1841.98E 1842.46 S 89.40 E 5.22 42.43S 1874.40E 1874.88 9909 9026.93 8940.34 86 24 S 89.40 E .00 43.19S 1946.96E 1947.44 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 1947.44 FEET AT SOUTH 88 DEG. 43 MIN. EAST AT MD = 9909 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 91.22 DEG. SP,-,KRY-SUN DRILLING SERVICES ANCHOILAGE ALASKA PAGE 3 StTARED SERVICES DRILLING PBU/P-12AST 500292213670 NORTH SLOPE BOROUGH COMPUTATION DATE: 5/16/95 DATE OF SURVEY: 040495 JOB NUMBER: AK-MW-50020 KELLY BUSHING ELEV. = 86.59 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 8741 8562.92 8476.33 48.63 S 1049.61 E 178.54 9741 9013.46 8926.88 41.75 S 1780.01 E 728.00 549.46 9909 9026.93 8940.34 43.19 S 1946.96 E 882.07 154.07 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. S~-~<RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SI-DARED SERVICES DRILLING PBU/P-12AST 500292213670 NORTH SLOPE BOROUGH COMPUTATION DATE: 5/16/95 DATE OF SURVEY: 040495 JOB NUMBER: AK-MW-50020 KELLY BUSHING ELEV. = 86.59 OPERATOR: BP EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVI) VERTICAL DIFFERENCE CORRECTION 8741 8562.92 8476.33 48.63 S 1049.61 E 178.54 8765 8586.59 8500.00 48.47 S 1054.94 E 179.13 .59 8868 8686.59 8600.00 49.88 S 1079.03 E 182.03 2.89 8975 8786.59 8700.00 58.50 S 1114.07 E 188.50 6.47 9091 8886.59 8800.00 75.99 S 1169.72 E 204.54 16.04 9265 8986.59 8900.00 81.89 S 1308.13 E 278.52 73.98 9909 9026.93 8940.34 43.19 S 1946.96 E 882.07 603.54 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POIAVfS ~RRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/P-12APH 500292213680 NORTH SLOPE BOROUGH COMPUTATION DATE: 5/16/95 TRUE SUB-SEA COURS COURSE MEASD VERTICAL VERTICAL INCLN DIRECTION DEPTH DEPTH DEPTH DG MN DEGREES DG/ DATE OF SURVEY: 032995 MWD SURVEY JOB NUMBER: AK-,MWr500203 KELLY BUSHIN~-~LEU'-.~-'~i~]~6~.59 FT. OPERATOR: BP EXPLORATION DLS TOTAL RECTANGULAR COORDINATES 100 NORTH/SOUTH EAST/WEST 7001 6880.75 6794.16 24 45 S 86.54 E .00 7017 6895.09 6808.50 24 44 S 86.26 E .75 7167 7036.30 6949.71 16 12 S 87.50 E 5.67 7200 7067.28 6980.69 15 23 S 86.10 E 2.75 7295 7160.11 7073.52 13 48 N 85.20 E 2.83 VERT. SECT. 43.10S 611.10E 612.54 43.51S 617.70E 619.15 46.50S 670.32E 671.86 46.98S 679.07E 680.62 46.89S 703.18E 704.69 7390 7252.13 7165.54 13 48 S 87.10 E 1.94 46 7487 7346.24 7259.65 12 6 S 88.00 E 1.77 47 7584 7441.50 7354.91 11 41 S 89.40 E .51 47 7682 7537.41 7450.82 12 36 N 89.40 E .95 47 7779 7632.11 7545.52 12 30 S 88.80 E .42 48 .52S 725.73E 727.19 .46S 747.35E 748.82 .91S 767.42E 768.89 .91S 788.07E 789.51 .02S 809.15E 810.56 7878 7728.52 7641.93 13 41 S 89.00 E 1.21 48 797.4 7821.55 7734.96 14 6 N 89.20 E .61 48 8069 7913.27 7826.68 14 36 N 89.90 E .56 48 8165 8005.88 7919.29 16 47 S 89.20 E 2.30 48 8261 8097.88 8011.29 16 30 S 88.60 E .36 49 .44S 831.58E 832.98 .48S 854.60E 855.97 .30S 878.06E 879.39 .47S 904.09E 905.39 .00S 931.60E 932.88 8358 8190.91 8104.32 15 41 S 89.80 E .89 49 8454 8283.58 8196.99 14 30 S 89.90 E 1.25 49 8548 8374.49 8287.90 13 53 N 89.60 E .65 49 8645 8469.31 8382.72 12 30 N 89.00 E 1.44 49 8741 8562.92 8476.33 12 41 N 88.30 E .26 48 .38S 958.44E 959.71 .45S 983.45E 984.68 .39S 1006.45E 1007.65 .12S 1028.69E 1029.84 .63S 1049.61E 1050.70 8834 8653.88 8567.29 13 23 S 87.70 E 1.22 48 8931 8748.11 8661.52 14 11 S 86.30 E .89 49 9026 8840.53 8753.94 12 53 S 86.60 E 1.37 51 9123 8934.48 8847.89 12 23 S 86.10 E .53 52 9218 9027.51 8940.92 11 48 S 87.30 E .68 53 .76S 1070.68E 1071.75 .98S 1093.79E 1094.89 .36S 1116.02E 1117.16 .70S 1137.06E 1138.25 .85S 1156.97E 1158.19 9314 9122.00 9035.41 11 36 S 87.70 E .22 54 9370 9176.53 9089.94 11 48 S 88.20 E .40 55 9420 9224.93 9138.34 11 48 S 88.20 E .00 55 .71S 1176.52E 1177.76 .liS 1187.81E 1189.05 .43S 1197.92E 1199.16 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 1199.20 FEET AT SOUTH 87 DEG. 21 MIN. EAST AT MD = 9420 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 93.11 DEG. S~_XRY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 SHARED SERVICES DRILLING PBU/P-12APH 500292213680 NORTH SLOPE BOROUGH COMPUTATI ON DATE: 5 / 16 / 95 DATE OF SURVEY: 032995 JOB NUMBER: AK-MW-50020 KELLY BUSHING ELEV. = 86.59 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 7001 6880.75 6794.16 8001 7847.33 7760.75 9001 8815.45 8728.86 9420 9224.93 9138.34 43.10 S 611.10 E 120.46 48.39 S 861.07 E 153.88 33.42 51.02 S 1110.29 E 185.76 31.88 55.43 S 1197.92 E 195.07 9.31 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. S~_.<RY-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/P- 12APH 500292213680 NORTH SLOPE BOROUGH COMPUTATION DATE: 5/16/95 DATE OF SURVEY: 032995 JOB NUMBER: AK-MW-50020 KELLY BUSHING ELEV. = 86.59 FT. OPERATOR: BP EXPLOPJtTION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 7001 6880.75 6794.16 43.10 S 611.10 E 120.46 7007 6886.59 6800.00 43.28 S 613.98 E 121.13 .67 7115 6986.59 6900.00 45.72 S 654.46 E 129.08 7.95 7220 7086.59 7000.00 47.26 S 684.32 E 133.48 4.40 7323 7186.59 7100.00 46.35 S 709.66 E 136.66 3.18 7426 7286.59 7200.00 46.94 S 734.17 E 139.63 2.97 7528 7386.59 7300.00 47.75 S 755.98 E 141.99 2.36 7630 7486.59 7400.00 48.00 S 776.81 E 144.14 2.15 7733 7586.59 7500.00 47.83 S 799.05 E 146.58 2.44 7835 7686.59 7600.00 48.27 S 821.41 E 149.05 2.47 7938 7786.59 7700.00 48.60 S 845.82 E 151.99 2.94 8041 7886.59 7800.00 48.31 S 871.11 E 155.14 3.15 8145 7986.59 7900.00 48.39 S 898.27 E 158.78 3.64 8249 8086.59 8000.00 48.92 S 928.25 E 163.18 4.40 8353 8186.59 8100.00 49.38 S 957.23 E 167.29 4.12 8457 8286.59 8200.00 49.45 S 984.23 E 170.88 3.59 8560 8386.59 8300.00 49.37 S 1009.45 E 174.01 3.13 8663 8486.59 8400.00 49.06 S 1032.52 E 176.65 2.63 8765 8586.59 8500.00 48.47 S 1054.94 E 179.13 2.49 8868 8686.59 8600.00 49.07 S 1078.47 E 181.87 2.73 8971 8786.59 8700.00 50.60 S 1103.48 E 184.96 3.10 9074 8886.59 8800.00 51.99 S 1126.52 E 187.59 2.63 9176 8986.59 8900.00 53.44 S 1148.41 E 189.97 2.38 9278 9086.59 9000.00 54.41 S 1169.26 E 192.13 2.15 9380 9186.59 9100.00 55.18 S 1189.91 E 194.24 2.11 9420 9224.93 9138.34 55.43 S 1197.92 E 195.07 .83 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS To: WELL LOG TRANSMITTAL State of Alaska Alaska Oil and Gas Conservation Comm. Attn: Larry Grant 3001 Porcupine Drive Anchorage, Alaska 99501 MWD Formation Evaluation Logs - P-12A AK-MW-50020 July 7, 1995 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of: Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 P-12A: 2" x 5" MD Gamma Ray Logs: 50-029-22136-00 2" x 5" TVD Gamma Ray Logs: 50-029-22136-00 1 Blueline 1 Reverse Folded Sepia 1 Blueline 1 Reverse Folded Sepia P-12A PBI: 2" x 5" MD Gamma Ray Logs: 50-029-22136-70 2" x 5" TVD Gamma Ray Logs: 50-029-22136-70 P-12A PB2: 2" x 5" MD Gamma Ray Logs: 50-029-22136-71 2" x 5" TVD Gamma Ray Logs: 50-029-22136-71 1 Blueline 1 Reverse Folded Sepia 1 Blueline 1 Reverse Folded Sepia 1 Bluel~e 1 Reverse Folded Sepia 1 Bluel~e x~ 1 Reverse Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: RE.. 31 March 1995 Transmittal of Data ECC #: 6398.00 Sent by: MAIL Data: OH-LDWG Dear Sir/Madam, Reference: P-12A-PH ~ PRUDHOE BAY NORTH SLOPE, AK Enclosed, please find the data as described below: Tapes/Diskettes: 1 LDWG TAPE + LIS Run # 1 Received by: Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 ~~Date:Or AX to (907~ 563-7803 Please s t gn and return to; ~etz~technical Data Center BP Exploration (Alaska) Ina 900 East Benson Boulevar~ Anchorage,. Alaska · 99508 ;, ~,laska 011 & Gas Cons. Com~[~$I!3n Anchorage RECEIVEU MAR 9 ~995 Alaska Oil & Gas 6ons. 6ommiss]o~ Anchorage LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 9 March 1995 RE: Transmittal of Data Sent by: ANCH.EXPRESS Dear Sir/Madam, Enclosed, please find the data as described below: WELL M-34 M-34 # DESCRIPTION 1 GR/CCL FINAL BL+RF 1 CCL FINAL BL+RF 1 PDK FINAL BL+RF 1 C/O FINAL BL+RF 1 PLS FINAL BL+RF Run # 1 Run # 1 Run # 1 Run # 1 Run # 1 ECC No. 5801.06 5813.01 6295.03 6295.04 6339.02 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: Please sign and return Petrotechnie~l Data Cente~ BP Exploration (A!s. ska) .. 900 East Benson Boulevard ~,~eaeived by · .~-- D~?t ~o ~;- , ........ TONY KNOWLES, GOVERNOR AI~I~ OIL ~ GAS CONSERVATION COM~IlSSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 March 6, 1995 Terry Jordon, Drlg Engr Supv BP Exploration (Alaska) Inc P O Box 196612 Anchorage, AK 99519-6612 Re: Well # Company Permit # Surf Loc Btmhole Loc Prudhoe Bay Unit P-.-12A BP Exploration (Alaska) Inc 95-22 2755'SNL, 2815'WEL, Sec 31, T11 N, R13E, UM 2791'SNL, 475'WEL, Sec 31, T11N, R13E, UM Dear Mr Jordon' Enclosed is the approved application for permit to re-drill the above referenced well. The permit to re-drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting re-drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) must be given to allow a representative of the Commission to witness a test of BOPE installed prior to drilling a new hole. Notice may be given by contacting the Commission's petroleum field inspector on the Nodh Slope pager at 659-3607. David W. Johnston ~ "% / BY ORDER OF THE COMMISSION dlf/encl c: Dept of Fish & Game, Habitat Section - w/o encl Dept of Environmental Conservation - w/o encl STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.OO5 la. Type of work Drill [] RedrilliTI lb. Type of well. ExploratoryF1 Stratigraphic Test [] Development Oil [] Re-Entry [] Deepen[] Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration 91.9' feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation ~ Bay Pool P. O. Box 196612, Anchorage, Alaska 99519-6612 ADL.28LZS~ ~z_~'.2,~¢ 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025) 2755' SNL, 2815' WEL, SEC. 31, T11N, R13E Prudhoe Bay Unit At top of productive interval 8. Well number Number 2816' SNL, 1253' WEL, SEC. 31, T11N, R13E P- 12A 25100302630-277 At total depth 9. Approximate spud date Amount 2791' SNL, 475' WEL, SEC. 31, T11N, R13E 3/17/95 $200,000.00 12. Distance to nearest 13. Distance to nearest well 4. Number of acres in propertyi15. Proposed depth (MD and TVD) property line ADL 28289-2489' feet No close appproach feet 2560 10226' MD~9007' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth zooo feet Maximum hole angle 9o o Maximum surface 3330 psig At total depth (TVD) 8800'/4390 psig 18. Casing program Specifications Setting Depth s~ze Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 6-3/4" 5-1/2" 17# L-80 NSCC 2598' 6850' 6746' 9448' 8993' 135 sx Class "G" 4-3/4" 3-1/2" 9. 3# L-80 EUE 928' 9298' 8968' 10226' 9007' Uncemented slotted liner I\L ~.,I...I ¥ L~.~' 19. TO be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary FEB 2 1 1995 Total depth: measured 9740 feet Plugs (measured) N~Ska.0ii.& Gas Cons. Commission true vertical 9273 feet Anch0ra '~ Effective depth: measured 9655 feet Junk (measured) true vertical 9197 feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor 80' 20" 110' 110' S u rface 2655' 10-3/4" 3392 cuft PF 2696' 2696' I nte rmediat e 9274' 7-5/8" 1474 cuft "G" 9311' 8894' Production Lin e r 688' 5-1/2" 150 cuft "G" 9052'-9740' 8675'-9273' Perforation depth: measured 9418'-9436', 9446'-9472', 9482'-9500' true vertical 8893'-8909', 8917'-8941', 8949'-8966' 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program [] Drilling fluid program [] Time vs depth plot [] Refraction analysis[] Seabed report[] 20 AAC 25.050 requirements[] 21.1 hereby certify that~t~e foreg~i~is tr,ue and?~J,~ ~¢4,~ correct to the best of my knowledge~/"~'~/~ Signed Title Drilling En~lineer Supervisor Date Commission Use Only Permit Number APl number Appro_val date,~___~,.~_~_~ See cover letter ~,,~-".2-2._, 50- o.2_?- ;z._.:2,/,~'-~ ! for other requirements !Conditions of approval Samples required [] Yes [] No Mud Icg required []Yes ,~ No Hydrogen sulfide measures [] Yes [] No Directional survey required ,J~ Yes [] No Required working pressure for BC~i~ _~An~3M~~'"~1""' ""~ ~'" "'-~ I~5M: I--I10M; 1-115M; Other: by order of ,~/~/,~ Approved by David W. ,Johnston Commissioner me commission Date~-/ I /J Form 10-401 Rev. 12-1-85 Submit ir iDliCate ]Well ~ IP-12a I Type of Well (producer or injector): Well Plan Summary I Producer ~ Surface Location: 2,755' FNL 2,815' FEL Sec 31 T11N R13E Target Location: 2,816' FNL 1,253' FEL Sec 31 T11N R13E (start of horizontal) Bottom Hole Location: 2,791' FNL 475' FEL Sec 31 T11N R13E (end of horizontal) ]AFE Number: 1 4P0618 I Estimated Start Date: I 3-17-95 I~m: I 10,226' I I Rig: I Nabors 28-E ] Operating days to complete: I 18 I RT'GL ] ITvD: 19,°°7' I II~E'MSL 35.1' 91.9' I Well Design (conventional,slimhole,etc.) I SuperSlimhole Horizontal Sidetrack I I Formation Markers: Formation Tops MD TVD(RKB) HRZ 7497' 7351' LCU 7524' 7378' Kingak 7720' 7567' Sag River 9094' 8863' Top Shublik 9121' 8881' Eileen 9294' 8966' Top Sadlerochit 9335' 8978' 7-5/8" Casing Point 9448' 8993' At Horizontal Total Depth 10226' 9007' End Slotted Liner Casing/Tubing Program: Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm Tbg O.D. MD/TVD MD/TVD 6-3/4" 5-1/2" 17# L-80 NSCC 2598' 6850'/6746' 9448'/8993' 4-3/4" 3-1/2" 9.3# L-80 EUE 928' 9298'/8968' 10226'/9007' (slotted) Tubing 4-1/2" 12.6# L-80 NSCT 6818' 32'/32' 6850'/6746' Logging Program: RECEIVED I Open Hole Logs: 6-3/4" Hole 4-3/4" Hole I Cased Hole Logs: W/L: Resistivity/S onic/GR/RFT's MWD: GR from 2nd KOP to Horizontal MWD: GR in horizontal section 7-5/8" Casing None FEB 1 1995 cons. ¢0mml~i0n 10ra * Mud Program' · Intermediate Mud Properties: ] 6-3/4" hole section to horizontal: LSND Depth Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 7,000' 9.7-9.8 40-45 10-12 4-8 8-12 9-10 <6 HTHP-15.0 9,094' 9.8-10.0 45-50 12-14 4-8 8-12 9-10 <6 HTHP- 15.0 9,448' 9.8-10.0 50-60 15-20 6-8 10-15 9-10 <6 HTHP-15.0 Hazards/Concerns Utilize hi vis sweeps to assist hole cleaning Treat with 2 ppb each of Boreplate, Barotrol, & Baranex before entering Kingak. Monitor LSYP and increase if problems occur trying to clean the hole. Potential high torque could need lubricant use. Reduce AP1 fluid loss to <6 cc before drilling Kingak Section. Production Mud Properties: 1 4-3/4" hole section: Xanvis KCL Depth Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9,448' 8.8-9.0 50-60 30-40 15-20 18-24 9.5-10.5 <6 10,226' 8.8-9.0 50-60 30-40 15-20 18-24 9.5-10.5 <6 Hazards/Concerns Lost Circulation still a possibility due to severe overbalance in Sadlerochit. Differential sticking possible with overbalance situation. Perform/report daily checks on KC1 concentrations in Xanvis KC1 system. High torque may be experienced and should be countered with Lubtex treatments. Directional: I I ?000' I Maximum Hole Angle: 90© Tangent Angle 15© Close Approach Well: None The above listed wells will be secured during the close approach. Well Control: Well control equipment consisting of 5,000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and drilling fluid system schematics on file with AOGCC. Disposal: RECEIVED Cuttings Handling' CC2A Fluid Handling: Annular injection. Annular Injection: Verify the list below against Karen Thomas' Report of Approved Wells prior to injection. DO NOT EXCEED 35,000 BBLS IN THE ANNULUS. ~× FEB 21 1995 Alaska 0il & Gas Cons. Commission Anchora" ~ ,'~ AREA WELL PREV VOL PERMITTED PERMITTED DATES INJECTED VOL (aBES) (aBES) WOA P-5 0 35,000 1/1/95-12/31/95 VVQA P-7 0 35,000 1/1/95-12/31/95 VVOA P-8 3021 35,000 1/1/95-12/31/95 WOA P-9 2823 35,000 1/1/95-12/31/95 WELL DATA ' ' PB DRILUNG"- ' P PAD, WELL 12A NABORS RIG 28E___'-- PRODUCTION LINER, DEPTH g449'MD, 8gg3"TVD VOLUME 124 CF HOLE SIZE 6 3/4" EXCESS 30% OH PIPE SIZE 5 1/2" OD, 17# VOLUME REQUIRED 158 cf MUD WEIGHT 10 ppg TOP OF CEMENT 8094' MD BHST 210° F PREFLUSH Preflush/Spacer BHCT 140° F CEMENT RECOMMENDATION _ Preflush: 70 Bbls BJ MCS-4 Spacer mixed 1 ppg over the current mud wt. Slu _rry: 135 Sks (158 cf) Class G + 150 ghs BA-86L -~ 0.25% FL-33 + 0.6% CD-32 + 0.15% A-2 -~ 0.5% Gel + 0.5 ghs FP-12L BATCH MIXED CEMENT PROPERTIES PREFLUSH SLURRY II I! i ii i i i m i DENSITY- PPG YIELD - CF/SK MIX WATER - GALS/SK THICKENING TIME - HRS:MINS FLUID LOSS - CC's / 30 MINS FREE WATER- ML's COMPRESSIVE STRENGTH - PSI 12 HOURS(~ OF 24 HOURS ~ OF 11 15.7 1.17 3.58 2:30- 3:00 + 0:45 SURFACE < 50 1900 3000 REMARKS Volume includes 80' float joint.Top of Liner (~ 6850'MD inside 7 5/8" csg. TOC based on 1000' above Sag River (9094'MD) Slight additive adjustment may be required to achieve the desired properties. RECEIVED FEB 2 1 1995 0il & Gas Cor~s. Commission Anchora ,~ P-12a Sidetrack Operational Summary 1. Cut tubing with wireline at + 7,300' md. 2. Move In Drilling Rig. Pull 4-1/2" tubing. 3. Set cement retainer at + 7,250' md. Pump 20 bbls of cement & displace cement to cover perfs @ 9,418' md - 9,500' md to the top of the 5-1/2" liner @ 9,052' md. 4. Mill out window at _+ 7,000' md and set a cement kick off plug. 5. Drill 6-3/4" hole as a pilot hole to + 9,336' md. Log well with GR/Resistivity/Sonic and RFT's. Depending on log results, decision to keep pilot hole will be made. If not, a cement kick off plug will be set. 6. Directionally drill a 6-3/4" hole off the kick plug to horizontal at + 9,448' md using gamma ray/directional. 7. Set 5-1/2" L-80 liner @ _+ 9,448' md. 8. Drill 4-3/4" hole reaching TD at _+ 10,226' md using xanvis mud. 9. Set 3-1/2" slotted liner @ TD. External casing packers will be used along the horizontal section. 10.Run new completion of 4-1/2" L-80 tubing to the top of the 5-1/2" liner at + 6,850' md. Drilling Hazards · A range of mud weights from 9.8 to 10.0 ppg may be used to drill the Sag River interval. · Unusual hole size in production hole (4-3/4") may cause difficulty directionally drilling the horizontal section. RECEIVED FEB 2 1 1995 ~!~ska Oil & Gas Cons. Commission Anchora ,~ VHH February 20, 1995 -?'ruahoe Bay Drillir dhoe Bay Unit PAD : -12A Wo13 NOW ,¢ / ;' / i HALLIBUR '.,, ; .... ;/....J / 2115195 8~52 om 6339 6930---- 6439 6833 /3/8 ~ 1433 --' 8140 8233.~ 8390 8400~-~ 8591 8630 8510 g639 8715 8800 B~57'~_ 8955. ~ooz! 9~09~ VERTICAL VIEW SCALE 200 ft.. / DIVISION TVD REF: WELLfIEAD VERTICAL SECTION fiEF: WELLHEAD ~ 23 59' ~ 6043 MD ~ ~3 93" 2 6079 MD b 24 13' ~ 6115 MD ~ 24.28' ~ 6151 MD % 24.37' ~ 6187 MD ~ ~4 48' ~ 6223 MD b 24-63' ~ 6259 MD o ~4-75' ~ 6294 MD b 24.82' ~ 6330 MD ~ 24.87' R 6365 MD ~ 24.90' ~ 6401 MD ~ 24.93' ~ 6436 MD ~ 25.00' ~ 64/2 MD ~ 24.93' ~ 6507 MD ~ 24.85' ~ 6543 MD ~ 24.80' ~ 6579 MD ~ 24./2' ~ 6614 MD 9 24./0' ~-6650 MD ~ 24.63' ~ 6685 MD ~ 24.62' ~ 6/21 MD ~ ~4.68' ~ 6757 ~D ~ ~4./8' ~ 6792 HD ~ 24.95' ~ 6828 ~D ~ 25.1E' ~ 6864 MD ~ 25.15' ~ 6899 MD % ~5.12' ~ 6935 MD b 84.93' ~ 6970 MD ..... /55 --- -- .... liP_--- -- I[ORIZONTAL VIEW (TRUE NORTH) SCALE 500 ft. / DIVISION SURVEY REF: WELLHEAD 943 976 -- -- -- 1043 500 ',\ ~. 21./8' [~ /100 MD &, 18.78' ~ 7200 MD ~\ 15.79' ~ 7300 MD · \ , -. \ - \ --- .--e '~5.00' ~ /496 MD HRZ -- --e f~.00' B /5~4 MD LCU e 15.'~)0' ~ 7720 MD TOP K[NGAK 3O0 MD, 9007 TVD 15 00' ~ ~,187 MD TJF x\ · --~ 15.00' ~ 83X3 MD fJE · \ --500 i I 1 l 000 1500 2000 2500 0 P-lEA Wpl3 NCW CASING POINT DATA UD MD Inc AZi TVD NI~ IT/W 5 1/2 in 9448 89.10' 89.20' 8993 61 ~ 1563 3.500 in 10226 88,85' 89.18' 9007 50 S 2340 CRITICAL POINT DATA MD Inc AZi. FVD N/S HRZ 7496 15,00' 9~.08' /351 50S 764 LCU 7524 15.00' 92.08' /378 50S /71 fOP K[NGAK 7720 15,00' 92.08' 7567 52S 821 TJF 8187 15,00' 92.08' 8018 57S 942 FJE 8313 15.00' 92.08' 8140 58S 975 TJD 8572 15.00' 92.08' 8390 60S 1042 rJC 8780 15,00' 92.08' 8591 62S 1096 TIE IN / 8800 15.00' 92.08' 8610 62S llOl [NrERPDLAFED POINT KDP / START 8830 15.00' 92.08' 8639 63S 1109 OF CURVE ~ 12.00'/100Ft [JO 891224.82' 90.86' 8716 63S 1136 SAG RIVER 909446.68' 89,92' 8863 64S 1242 PGDC 910047.38' 89.90' 8867 64S 124; SHUBLIK 912149.93' 89.84' 8881 64S I262 EILEEN 929470.60' 89.46' 8966 63S t4ll FoP 933575.55' 89.39' 8978 62S 1451 SADLERDCII[T / [VISIIAK / ZONE 4/48 SrAR¥ DF 9448 89.10' 89.~0' 8993 61 S156~ CURVE ~ 0.03'/100 Ft EHS 1022688.85' 89.18' 9007 50 S2341 f6rDet Nome FVD NS 'EW Grid X Grid Y EHS 9007 50 S 2341E 633814 5947247 POLYGON 8992 253N 1236E 632704 5947530 PILOT 8972 64 S 1163E 632637 5947212 DRLSPDLYt 8994 136N 1366E 632836 5947416 DRLSPOLY2 8994 136N 1366E 632836 594/416 PILBTPOLY 8972 86 N 1166E 632637 5947362 DAte Ptotted : 2/15/95 Cre~ted By :D. Westey Checked By : . ~/~ Approved By PROPOSED BHL TVD 9006.90 MD 10226.10 VS 2341.06 N/S 5o.oo s E/W 2340.53 E \ 15.00' 8 8578 MBxx T JO RECEIVED --~ 15,00' ~ 8800 MD IN / INTE~POL~TE~ PO'ET ,,. oo., ..,o .. oo.,,oo ,, FEB 2 1 i995 : 24.82' ~ 8912 MD rob Xx ~ ~.~. ~ ~o~o .. '"', ~i~'~ fill & Oa~G'on~ Cor, mb~lun-'~, '% ~47.38'.~ 9100 MD POD% ~IUIIUI~An"H .... . --~ ~49,93 ~ 9rEt MD SH~L[K ' ' -~ ~ 70.60' ~ 9~94 ~D EILEEN : ~ /75.55' R 9335'~D TOP SADLERDCHIT / [V[SHAK / ZONE 4/48 _ ; ~ ~ 1/~ in,OD, , 9448 MD, 8993 TVD ~ ~ -~ ~89.10''~ 9448 MD SI~RT DF CURVE ~ 0.03'/100 Ft ~ ~ .97' ~.50 ~n OD, ~ lO,a6 MD, ~007 TVD --__ __ --__ --_._ -- 1--097__ lllO 1138 1108 1243 1248 ..... 1264 1563 9400 3 200 400 600 8oo 1452 8341 -- · ~ \ · ~'-: ", -o I , i~1 ! I I I I I 000 1200 14 O0 1600 1800 2000 2200 I I 2400 2600 2800 VERTICAL SECTION PLANE: 91.22 STATE OF ALASKA '~ -' ALAS,~. OIL AND GAS CONSERVATION COMMISSIOi,, APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon X Suspend __ Operation Shutdown __ Re-enter suspended well __ Alter casing __ Repair well __ Plugging X Time extension __ Stimulate __ Change approved program __ Pull tubing __ Variance __ Perforate __ Other X __ Plugback for redrill 2. Name of Operator BP Exploration 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development × Exploratory __ Stratigraphtc __ Service 4. L oc.a, tion of well ,a,t surface 2755 SNL, 2815 WEL, SEC. 31, T11N, R13E At top of productive interval 3064' SNL, 1065' WEL, SEC. 31, T11N, RI~ At effective depth At total depth 3117'SNL, 929'WEL, SEC. 31, T11N, RI~E ~ ,,,//' Total depth: measured --9'748~f..~-t'~ Plugs (measured) true vertical 9273 feet 6. Datum elevation (DF or KB) KBE = 92.08 7. Unit or Properly name Prudhoe Bay Unit 8. Well number P-12 (43-31-11-13) 9. Permit number 91-17 10. APl number 50- 029-22136 11. Field/Pool Prudhoe Bay Field/Oil Pool Effective depth: . Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: measured 9655 feet Junk (measured) true vertical 9197 feet Length Size Cemented 80' 20" 2655' 10-3/4" 3392 cuft Permafrost 9274' 7-5/8" 1474 cu ft Class "G" 688' 5-1/2" 150 cuft Class "G" measured 9418'-9436', 9446'-9472', 9482'-9500' Measured depth 110' 2696' 9311' 9052'-9740' R[CEiYE, D True vertical depth 110' 2696' 8894' 8675'-9273' true vertical 8893'-8909~ 8917~8941~ 8949L8966' Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 tubing to 9053' MD FEB 2 1 1995 A~aska u~l & Ga~ Cons, Commissar., Anch0rr. * Packers and SSSV (type and measured depth) 7-5/8" TIW HB-BP packer @ 8893' MD; Otis "HXO" SSSV @ 2097' MD feet 13. Attachments Description summary of proposal x Detailed operations program __ BOP sketch 14. Estimated date for commencing operation 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil x Gas__ Suspended__ Service 17. I hereby certify that the foregoing is.true and correct to the best of my knowledge. Signed ~~~/~ TitleDrillingEngineerSuperviso~ FOR COMMISSION USE ONLY / ' Conditions of approval: Notify Commission so representative may witness Plug integrity __ BOP Test __ Location clearance Mechanical Integrity Test~ Subsequent form required 10- Approved by order of the Commission Form 10-403 Rev 06/15/88 *"- SUBMIT IN TRIPLICATE WELL PERMIT CHECKLIST UNIT# PROGRAM: exp [] dev [] redrll~ serv [] , ADMINISTRATION 1. Permit fee attached .................. 2. Lease number appropriate ............... 3. Unique well name and number .............. 4. Well located in a defined pool ............. 5. Well located proper distance from drlg unit boundary. 6. Well located proper distance from other wells ..... ~ 7. Sufficient acreage available in drilling unit ..... 8. If deviated, is wellbore plat included ........ 9. Operator only affected party .............. 10. Operator has appropriate bond in force ......... 11. Permit can be issued without conservation order .... 12. Permit can be issued without administrative approval. 13. Can permit be approved before 15-day wait ....... ENGINEERING APPR D~~ ~ GEoLogY 14. Conductor string provided ................ Y 15. Surface casing protects all known USDWs ......... Y N 16. CMT vol adequate to circulate on conductor & surf csg. . Y N 17. CM~ vol adequate to tie-in long string to surf csg . . . Y N 18. CMT will cover all known productive horizons ....... Y 19. Casing designs adequate for C, T, B & permafrost .... ~ N 20. Adequate tankage or reserve pit ............. ~ N 21. If a re-drill, has a 10-403 for abndnmnt been approved. .Y N 22. Adequate wellbore separation proposed .......... ~ N 23. If diverter required, is it adequate ........... 24. Drilling fluid program schematic & equip list adequate .~ N 25. BOPEs adequate ..................... ~ N 26. BOPE press rating adequate; test to ~ psig.~ 27. Choke manifold complies w//~PI RP-53 (May 84) ....... 28. Work will occur without operation shutdown ....... ~ N 29. Is presence of E2S gas probable ............. Y APPR 30. Permit can be issued w/o hydrogen sulfide measures .... Y N/ 31. Data presented on potential overpressure zones ..... Y /~ 32. Seismic analysis 9f shallow gas zones .......... ~/ N 33. Seabed condition survey (if off-shore) ........ /Y N 34. Contact name/phone for weekly progress reports . . . /. Y N [exploratory only] GEOLOGY: ENGINEERING: COMMISSION: Comments/Instructions: HOW/jo - A:~ORMS~cheklist rev 03/94 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 6495.00 WORTHINGTON D. NAKAMURA P-12A 500292213601 BP EXPLORATION (ALASKA) INC. SPERRY-SUN DRILLING SERVICES ~,%, ~~~· MWD RUN 2 WORTHINGTON K. WHITE MWD RUN 3 R. JACKSON K. WHITE JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 4 R. JACKSON K. WHITE MWD RUN 7 R. JACKSON C. DIXON MWD RUN 8 R. JACKSON C. DIXON JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: MWD RUN 9 R. JACKSON C. DIXON 31 liN 13E 2755 2815 FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 6.750 5.500 9375.0 4.750 3.500 10303.0 MWD - DGR. ALL DEPTHS ARE MEASURED BIT DEPTHS. PRE/POST MUD DISPLACEMENT TO FLOPRO WAS TAKEN AT 9310' PRE DISPLACEMENT SAMPLES = 21.2 AAPI POS DISPLACEMENT SAMPLES = 24.8 AAPI APPARENT SHIFT OF 3.6 AAPI. THERE ARE 3 WELLBORES PRESENTED IN 3 DIFFERENT LDWG TAPES FOR THIS LOCATION: P-12A (FINAL HOLE) MWD RUNS 1, PART OF 2, 3, 4, 7, 8, & 9. P-12A PB1 (PILOT HOLE) MWD RUN 2. P-12A PB2 (ABANDONED) MWD RUNS 5 & 6. NO DEPTH SHIFTS WERE APPLIED AS THIS IS THE DEPTH REFERENCE FOR THIS WELL. FILE HEADER FILE NUMBER' 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH GR 6950.0 $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD MWD MWD MWD $ REMARKS: STOP DEPTH 10245.0 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 7017.0 7637.0 7637.0 8835.0 8835.0 9045.0 9045.0 9375.0 9375.0 9937.0 9937.0 10073.0 10073.0 10303.0 MERGED MAIN PASS. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : P - 12A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 81 Tape File Start Depth = 10310.000000 Tape File End Depth = 6950.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 20164 datums Tape Subfile: 2 184 records... Minimum record length: Maximum record length: 18 bytes 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 6950.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 7577.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 1. 24-MAR-95 MSC DGWD VERSION 1.32 DEP VERSION 2.041 MEMORY 7637.0 7017.0 7637.0 0 11.7 24.7 TOOL NUMBER NGP 110 6.750 .0 LSND 9.60 46.0 9.8 700 6.6 .000 .000 .000 .000 .0 141.6 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : P - 12A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 17 Tape File Start Depth = 7640.000000 Tape File End Depth = 6950.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 4144 datums Tape Subfile: 3 80 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW ~D Curves and log header data for each bit run in separate files. BIT RUN NO: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 7582.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9363.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 2. 27-MAR-95 MSC DGWD VERSION 1.32 DEP VERSION 2.041 MEMORY 9420.0 7637.0 9420.0 0 11.6 16.8 TOOL NUMBER NGP 110 6.750 .0 LSND 9.65 56.0 9.6 600 5.6 .000 .000 .000 .000 .0 150.0 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT DATA BELOW KICK OFF POINT OF 8835' IS FROM THE PILOT HOLE (P-12A PB1). $ : BP EXPLORATION (ALASKA) : P - 12A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 44 Tape File Start Depth = 9425.000000 Tape File End Depth = 7580.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 31238 datums Tape Subfile: 4 109 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW ~D Curves and log header data for each bit run in separate files. BIT RUN NO: 3 DEPTH INCREMENT: .5000 FILE SIHV[MARY VENDOR TOOL CODE START DEPTH DGR 8835.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 8988.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: MWD RUN 3. 29-MAR-95 MSC DGWD VERSION 1.32 DEP VERSION 2.041 MEMORY 9045.0 8835.0 9045.0 0 20.0 26.0 TOOL NUMBER NGP 147 6.750 .0 LSND 9.75 58.0 11.2 50O 5.5 .000 .000 .000 .000 .0 141.6 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : P - 12A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 6 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 Tape File Start Depth = 9045.000000 Tape File End Depth = 8830.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 5438 datums Tape Subfile: 5 69 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 8988.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9319.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 4. 31-MAR- 95 MSC DGWD VERSION 1.32 DEP VERSION 2.041 MEMORY 9375.0 9045.0 9375.0 0 28.4 81.4 TOOL NUMBER NGP 147 6.750 .0 LSND 9.70 56.0 10.3 8O0 5.6 .000 .000 .000 .000 .0 150.1 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : P - 12A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 * DATA RECORD (TYPE# 0) 1014 BYTES * API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 4 90 810 01 Total Data Records: 10 Tape File Start Depth = 9380.000000 Tape File End Depth = 8985.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 33612 datums Tape Subfile: 6 73 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 7 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 9027.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9878.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 7. 06-APR-95 NSC DGWD VERSION 1.32 DEP VERSION 2.041 MEMORY 9937.0 9375.0 9937.0 0 87.1 91.5 TOOL NUMBER NGP 110 4.750 9375.0 FLOPRO 9.10 65.0 10.4 35000 6.2 .000 .000 .000 .000 .0 150.1 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : P - 12A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 22 Tape File Start Depth = 9940.000000 Tape File End Depth = 9025.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 10932 datums Tape Subfile: 7 85 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 8 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 9878.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10014.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 8. 07-APR-95 NSC DGWD VERSION 1.32 DEP VERSION 2.041 MEMORY 10073.0 9937.0 10073.0 0 87.6 90.5 TOOL NUMBER NGP 110 4.750 9375.0 FLOPRO 9.10 80.0 9.3 33000 6.0 .000 .000 .000 .000 .0 150.1 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : P - 12A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 5 Tape File Start Depth = 10075.000000 Tape File End Depth = 9875.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 34816 datums Tape Subfile: 8 68 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 9 is type: LIS FILE HEADER FILE NUMBER: 8 RAW ~D Curves and log header data for each bit run in separate files. BIT RUN NO: 9 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 10015.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 10245.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 9. 08-APR-95 MSC DGWD VERSION 1.32 DEP VERSION 2.041 MEMORY 10303.0 10073.0 10303.0 0 88.1 90.1 TOOL NUMBER NGP 110 4.750 9375.0 FLOPRO 9.10 84.0 9.3 36000 5.2 .000 .000 .000 .000 .0 154.3 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : P - 12A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: Tape File Start Depth = 10310.000000 Tape File End Depth = 10010.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 12736 datums Tape Subfile: 9 71 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 10 is type: LIS 95/10/ 6 01 **** REEL TRAILER **** 95/lO/ 6 01 Tape Subfile: 10 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Fri 6 OCT 95 1:42p Elapsed execution time = 1.76 seconds. SYSTEM RETURN CODE = 0 Tape Subfile 2 is, typ6: LIS TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD MWD RUN 2 6496.00 WORTHINGTON K. WHITE 500292213670 BP EXPLORATION (ALASKA) INC. SPERRY-SUN DRILLING SERVICES 31 liN 13E 2755 2815 86.59 85.09 54.16 OPEN HOLE CASING DRILLERS 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: BIT SIZE (IN) SIZE (IN) DEPTH (FT) 6.750 5.500 9375.0 4.750 3.500 10303.0 MWD - DGR. ALL DEPTHS ARE MEASURED BIT DEPTHS. PRE/POST MUD DISPLACEMENT TO FLOPRO WAS TAKEN AT 9310' PRE DISPLACEMENT SAMPLES = 21.2 AAPI POS DISPLACEMENT SAMPLES = 24.8 AAPI APPARENT SHIFT OF 3.6 AAPI. THERE ARE 3 WELLBORES PRESENTED IN 3 DIFFERENT LDWG TAPES FOR THIS LOCATION: P-12A PB1 (PILOT HOLE) MWD RUN 2. P-12A PB2 (ABANDONED) MWD RUNS 5 & 6. P-12A (FINAL HOLE) MWD RUNS 1, PART OF 2, 3, 4, 7, 8, & 9. NO DEPTH SHIFTS WERE APPLIED AS THIS IS THE DEPTH REFERENCE FOR THIS WELL. -- FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH GR 8835.0 9363.0 $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD $ REMARKS: EQUIVALENT UNSHIFTED DEPTH -- BIT RUN NO MERGE TOP 2 8835.0 MERGE BASE 9420.0 MERGED MAIN PASS. ONLY DATA BELOW KICK OFF POINT 8835' IS INCLUDED HERE. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : P - 12A PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 15 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 Tape File Start Depth = Tape File End Depth = Tape File Level Spacing = 9425.000000 8830.000000 0.5O0000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 3574 datums Tape Subfile: 2 103 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 7582.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9363.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 2. 27-MAR-95 MSC DGWD VERSION 1.32 DEP VERSION 2.041 MEMORY 9420.O 7637.0 9420.0 0 11.6 16.8 TOOL NUMBER NGP 110 6.750 .0 LSND 9.65 56.0 9.6 600 5.6 .000 .000 .000 .000 .0 150.0 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT DATA ABOVE KICK OFF POINT OF 8835' IS ~'ROM THE FINAL HOLE (P-12n) . $ : BP EXPLORATION (ALASKA) : P - 12A PB1 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 44 Tape File Start Depth = 9425.000000 Tape File End Depth = 7580.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 11074 datums Tape Subfile: 3 109 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 4 is type: LIS 95/10/ 6 01 **** REEL TRAILER **** 95/10/ 6 01 Tape Subfile: 4 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Fri 6 OCT 95 9:33a Elapsed execution time = 0.76 seconds. SYSTEM RETURN CODE = 0 Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA MWD RUN 5 JOB NUMBER: 6497.00 LOGGING ENGINEER: R. JACKSON OPERATOR WITNESS: K. WHITE SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD OPEN HOLE 500292213671 BP EXPLORATION (ALASKA) INC. SPERRY-SUN DRILLING SERVICES MWD RUN 6 R. JACKSON K. WHITE 31 13E ~ '''''~' ' .... 2755 ~.~,,.,h~ i ..... 2815 .4!~::~_-~q Oil ",~,~-.; ii,~ i:, ,~. - 86.59 85.09 54.16 CASING DRILLERS lST STRING 2ND STRING 3RD STRING PRODUCTION STRING REMARKS: BIT SIZE (IN) SIZE (IN) DEPTH (FT) 6.750 5.500 9375.0 4.750 3.500 10303.0 MWD - DGR. ALL DEPTHS ARE MEASURED BIT DEPTHS. PRE/POST MUD DISPLACEMENT TO FLOPRO WAS TAKEN AT 9310' PRE DISPLACEMENT SAMPLES = 21.2 AAPI POS DISPLACEMENT SAMPLES = 24.8 AAPI APPARENT SHIFT OF 3.6 AAPI. THERE ARE 3 WELLBORES PRESENTED IN 3 DIFFERENT LDWG TAPES FOR THIS LOCATION: P-12A PB2 (ABANDONED) MWD RUNS 5 & 6. P-12A (FINAL HOLE) MWD RUNS 1, PART OF 2, 3, 4, 7, 8, & 9. P-12A PB1 (PILOT HOLE) MWD RUN 2. NO DEPTH SHIFTS WERE APPLIED AS THIS IS THE DEPTH REFERENCE FOR THIS WELL. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE S~RY PBU TOOL CODE START DEPTH GR 9375.0 $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD MWD $ REMARKS: STOP DEPTH 9842.0 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 5 9375.0 9432.0 6 9432.0 9909.0 MERGED MAIN PASS. ONLY DATA BELOW KICK OFF POINT 9375' IS INCLUDED HERE. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : P - 12A PB2 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 13 Tape File Start Depth = Tape File End Depth = 9915.000000 9370.000000 Tape File Level SpaCing = Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 3274 datums Tape Subfile: 2 102 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes 0.500000 Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 5 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 9208.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9365.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 5. 03-APR-95 MSC DGWD VERSION 1.32 DEP VERSION 2.041 MEMORY 9432.0 9375.0 9432.0 0 87.0 87.0 TOOL NUMBER NGP 147 4.750 9375.0 FLOPRO 9.00 86.0 10.4 35000 6.4 .000 .000 .000 .000 .0 137.5 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT DATA ABOVE KICK OFF POINT OF 9375' IS FROM THE FINAL HOLE (P-12A) . $ : BP EXPLORATION (ALASKA) : P - 12A PB2 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 6 Tape File Start Depth = 9435.000000 Tape File End Depth = 9205.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 1384 datums Tape Subfile: 3 71 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 6 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH DGR 9364.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 9842.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ): REMARKS: MWD RUN 6. 04-APR-95 MSC DGWD VERSION 1.32 DEP VERSION 2.041 MEMORY 9909.0 9432.0 9909.0 0 83.7 91.9 TOOL NUMBER NGP 110 4.750 9375.0 FLOPRO 9.00 84.0 10.7 38000 7.0 .000 .000 .000 .000 .0 145.9 .0 .0 .00 .000 .0 0 CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : P - 12A PB2 : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 14 Tape File Start Depth = 9915.000000 Tape File End Depth = 9360.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 6608 datums Tape Subfile: 4 77 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: LIS 95/10/ 6 01 **** REEL TRAILER **** 95/10/ 6 01 Tape Subfile: 5 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Fri 6 OCT 95 1:47p Elapsed execution time = 0.77 seconds. SYSTEM RETURN CODE = 0 Tape Subfil~ 2 i~ type.. LIS TAPE HEADER PRUDHOE BAY UNIT OPEN HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL- · ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING RUN 1 6398.00 R. ECK R. KALISH REMARKS: OPEN HOLE P-i2A-PH 500292213680 BP EXPLORATION (ALASKA) INC. WESTERN ATLAS LOGGING SERVICES 29-MAR-95 RUN 2 RUN 3 31 liN 13E 2525 2190 86.59 85.10 55.49 CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 7.625 7012.0 6.750 9420.0 DIFL/AC/CN/GR. CIRCULATION STOPPED @ 21:30, 26-MAR-95. PER CLIENT'S REQUEST, BOREHOLE & TORNADO CHART CORREC- TIONS WERE APPLIED TO THE DIL DATA. THE DIL DATA WAS CORRECTED FOR BOREHOLE SIZE (6.750"). THE CORRECTED DATA WAS THEN USED IN THE ATLAS TORNADO CHART TO GET "RT" & "DI" CURVES. RT = TRUE FORMATION RESISTIVITY. DI = DEPTH OF INVASION. NEUTRON LOG PARAMETERS: SANDSTONE MATRIX, BOREHOLE CORRECTION = 6.750", CHISM FILTERING IS ACTIVE, CASING CORRECTIONS OFF, SALINITY = 0.00 PPM. FILE HEADER FILE NUMBER: 1 EDITED OPEN HOLE MAIN PASS All tool strings; hole data. DEPTH INCREMENT: FILE SUMMARY PBU TOOL CODE GR BCS DIL 2435 $ BASELINE CURVE FOR SHIFTS: GR CURVE SHIFT DATA (MEASURED DEPTH) depth shifted and clipped curves; all runs merged; .5000 START DEPTH STOP DEPTH 7706.0 9300.0 9004.0 9336.0 7706.0 9364.0 8985.0 9307.0 BASELINE DEPTH LL8 7708.5 7718.5 7718.5 7740.0 7745.0 7777.0 7782.0 7840.5 7883.5 7884.0 7890.5 7915.0 7923.5 7923.5 7929.5 7929.5 7955.5 7956.0 7956.0 7973.5 7978.5 8053.0 8054.0 8126.0 8152.5 8152.5 8158.0 8162.0 8173.5 8173.5 8183.0 -- 8194.0 8194.0 8219.5 8220.0 8271.5 8271.5 8289.0 8289.0 8290.0 8295.0 8295.0 8351.5 8409.0 8409.0 8486.0 8486.0 8504.0 8504.0 8515.5 8516.0 8519.0 8533.5 8534.0 8553.0 8559.5 8559.5 EQUIVALENT UNSHIFTED DEPTH ILD DT NPHI 7708.5 7740.0 7746.0 7777.0 7783.0 7841.0 7891.5 7915.0 7955.0 7974.0 7978.5 8052.5 8053.5 8126.0 8158.5 8163.0 8182~5 8270.5 8289.0 8295.5 8351.5 8515.5 8516.5 8519.5 8554.0 no case 8584 8592 8603 8620 8622 8623 8625 8663 8677 8679 8693 8696 8700 8712 8713 8720 8731 8742 8775 8786 8837 8854 8877 8883 8883 8889 8890 8891 8904 8932 8955 8967 8980 8982 8998 8998 9011 9019 9023 9025 9033 9033 9037 9042 9055 9059 9059 9063 9064 9064 9067 9068 9072 9073 9073 9075 9075 9081 9081 9083 O ~ 5 0 0 5 0 5 0 0 5 0 5 0 0 5 5 5 0 5 5 0 0 0 0 5 5 0 5 5 5 5 0 0 5 0 5 5 0 5 5 0 5 5 0 5 0 5 5 0 5 0 0 0 0 5 0 5 0 5 0 · ~33.5 8592.5 8602.5 8620.0 8623.0 8626.0 8677.0 8696.5 8700.5 8711.5 8720.5 8732.0 8786.5 8837.0 8883.0 8891.5 8932.5 8967.0 9025.5 9041.5 9056.5 9059.0 9064.5 9073.0 9075.5 9080.5 9083.0 8623.0 8663.0 8679.5 8693.0 8714.5 8743.0 8775.5 8854.0 8876.0 8883.0 8884.0 8890.0 8891.0 8905.5 8955.0 8980.0 8982.5 8998.5 8999.0 9018.5 9032.5 9036.5 9041.0 9055.0 9059.0 9063.5 9064.5 9067.5 9068.0 9072.5 9075.5 9079.5 9011.5 9023.5 9033.0 9042.0 9057.0 9060.0 9071.5 9073.0 9081.5 9024.0 9042.0 9059.5 9067.5 9073.5 9081.5 9085.0 9085.5 9091.0 9091.5 9095.0 9095.5 9097.5 9107.0 9110.5 9111.0 9113.5 9115.5 9117.0 9120.0 9125.5 9126.0 9130.0 9130.5 9136.5 9138.0 9138.5 9139.0 9142.0 9143.5 9145.0 9148.0 9149.0 9150.0 9154.5 9157.5 9158.5 9161.0 9166.0 9169.0 9176.0 9178.0 9183.5 9186.5 9190.0 9192.5 9202.0 9205.5 9206.0 9226.0 9230.5 9232.5 9236.0 9236.5 9248.0 9248.5 9258.0 9264.5 9267.5 9272.5 9293.0 9295.5 9315.0 9316.5 9323.5 9330.0 ~,,85.0 9095.5 9111.0 9138.0 9142.5 9144.5 9150.0 9158.5 9161.5 9169.5 9176.5 9184.0 9203.0 9232.5 9236.0 9090.5 9097.0 9106.5 9113.5 9125.0 9139.0 9148.5 9153.5 9157.5 9166.5 9178.0 9264.5 9316.0 9317.5 9322.5 9329.0 9085.5 9095.0 9111.5 9116.0 9126.5 9130.0 9136.5 9139.0 9142.5 9143.5 9150.0 9177.5 9187.0 9192.5 9206.5 9226.5 9231.0 9248.5 9258.5 9272.5 9293.0 9296.0 9323.5 9086.0 9091.5 9095.0 9111.5 9116.0 9117.0 9120.5 9126.0 9130.5 9148.0 9150.0 9154.5 9176.0 9189.5 9206.5 9226.5 9231.0 9235.5 9248.0 9267.0 9348.5 9351.0 $ MERGED DATA SOURCE PBU TOOL CODE GR BCS DIL 2435 $ REMARKS: RUN NO. 1 1 1 1 MAIN PASS. 9348.0 9350.5 PASS NO. 4 4 4 4 MERGE TOP 7706.0 9004.0 7706.0 8985.0 MERGE BASE 9300.0 9336.0 9364.0 9307.0 CN WN FN COUN STAT ??MATCH1. OUT ?MATCH2. OUT ??MATCH3. OUT ?MATCH 4. OUT : BP EXPLORATION (ALASKA) : P-12A-PH : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPES 64 ) ONE DEPTH PER FRAME Tape depth ID: F 14 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR BCS 68 1 GAPI 4 2 DT BCS 68 1 US/F 4 3 TEND BCS 68 1 LB 4 4 TENS BCS 68 1 LB 4 5 LL8 DIL 68 1 OHMM 4 6 ILM DIL 68 1 OHMM 4 7 ILD DIL 68 1 OHMM 4 8 RT DIL 68 1 OHMM 4 9 DI DIL 68 1 IN 4 10 MTEM DIL 68 1 DEGF 4 11 SP DIL 68 1 MV 4 12 NPHI 2435 68 1 PU-S 4 13 FUCT 2435 68 1 CPS 4 14 NUCT 2435 68 1 CPS 4 4 67 465 06 6 4 84 653 71 5 4 20 789 90 0 4 20 789 90 0 4 50 746 76 1 4 50 746 76 1 4 50 746 76 1 4 50 746 76 1 4 50 746 76 1 4 50 746 76 1 4 50 746 76 1 4 98 211 23 1 4 98 211 23 1 4 98 211 23 1 56 * DATA RECORD (TYPES 0) 966 BYTES * Total Data Records: 211 Tape File Start Depth = 9380.000000 Tape File End Depth = 7700.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 50416 datums Tape Subfile: 2 471 records... Minimum record length: 62 bytes Maximum record length: 966 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 RAW OPEN HOLE MAIN PASS Curves and log header data for each run and tool string in separate files; Tool String #1 for Sadlerochit run presented first (primary depth control string used to depth shift the Sadlerochit interval) followed by files for other main pass tool strings per run. RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY 1 1 4 .2500 VENDOR TOOL CODE START DEPTH GR 7706.0 AC 9004.0 DIFL 7706.0 2435 8985.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): STOP DEPTH 9308.0 9343.0 9372.0 9315.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS TEMP GR CN KNJT PCM KNJT AC DIFL $ CABLEHEAD TENSION MASS ISOLATION SUB TEMPERATURE GAMMA RAY COMPENSATED NEUTRON KNUCKLE JOINT PULSE CODE MODULATOR KNUCKLE JOINT BHC ACOUSTILOG DUAL INDUCTION BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): 27-MAR-95 FSYS REV. J001 VER. 1.1 2130 26-MAR-95 504 27-MAR-95 9420.0 9366.0 7700.0 9364.0 1800.0 TOOL NUMBER 3974XA 3967XA 2806XA 1309XA 2435XA 392 INA 3506XA 392 iNA 1609EA/1603MA 1503XA 6.750 7012.0 .0 LSND / POLYMER 9.70 56.0 9.7 5.7 200.0 RESIStiVITY (OHMs.., AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: MAIN PASS. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : P-12A-PH : PRUDHOE BAY : NORTH SLOPE : ALASKA 2.220 .990 2.930 .000 2.360 .000 THERMAL SANDSTONE .00 6.750 1.5 81.0 200.0 55.0 .0 60.0 .0 * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 20 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2O GR AC 68 1 GAPI AC AC 68 1 US/F CHT AC 68 1 LB TTEN AC 68 1 LB SPD AC 68 1 F/MN RFOC DIFL 68 1 OHMM RILM DIFL 68 1 OHMM RILD DIFL 68 1 OHMM VILM DIFL 68 1 MV VILD DIFL 68 1 MV CILD DIFL 68 1 MMHO RT D I FL 68 1 OHM}{ DI DIFL 68 1 IN TEMP DIFL 68 1 DEGF SP DIFL 68 1 MV CNC 2435 68 1 PU-S CNCF 2435 68 1 PU-S CN 2435 68 1 PU-L LSN 2435 68 1 CPS SSN 2435 68 1 CPS 4 4 06 969 49 6 4 4 48 852 89 1 4 4 95 558 30 1 4 4 95 558 30 1 4 4 61 094 30 1 4 4 27 515 24 6 4 4 06 213 78 0 4 4 04 903 06 0 4 4 04 522 10 6 4 4 04 522 10 6 4 4 34 704 23 6 4 4 04 903 06 0 4 4 06 213 78 0 4 4 40 467 34 0 4 4 53 419 67 0 4 4 98 211 23 1 4 4 98 211 23 1 4 4 52 326 75 5 4 4 84 023 70 1 4 4 83 368 34 1 8O * DATA RECORD (' E~ 0) 1014 BYTES * 561 Total Data Records: Tape File Start Depth = 9382.000000 Tape File End Depth = 7702.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 141142 datums Tape Subfile: 3 642 records... Minimum record length: 44 bytes Maximum record length: 1014 bytes Tape Subfile 4 is type: LIS RUN NUMBER: TOOL STRING NUMBER: PASS NUMBER: DEPTH INCREMENT: FILE SUMMARY FILE HEADER FILE NUMBER: 3 RAW OPEN HOLE REPEAT PASSES Curves and log header data for each pass, tool string, and run in separate files. 1 1 3 .2500 VENDOR TOOL CODE START DEPTH STOP DEPTH GR 9004.0 9320.0 AC 9004.0 9355.0 DIFL 9004.0 9384.0 2435 9004.0 9327.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME CIRCULATION ENDED: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): 27-MAR-95 FSYS REV. J001 VER. 1.1 2130 26-MAR-95 444 27-MAR-95 9420.0 9366.0 7700.0 9364.0 1800.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CHT MIS TEMP GR CN KNJT PCM KNJT AC DIFL $ CABLEHEAD TENSION MASS ISOLATION SUB TEMPERATURE GAMMA RAY COMPENSATED NEUTRON KNUCKLE JOINT PULSE CODE MODULATOR KNUCKLE JOINT BHC ACOUSTILOG DUAL INDUCTION TOOL NUMBER 3974XA 3967XA 2806XA 1309XA 2435XA 392 iNA 3506XA 3921NA 1609EA/1603MA 1503XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 6.750 7012.0 .0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: FLUID LOSS (C3): MAXIMUM RECORDED TEMPERATURE (DEGF): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): LSND / POLYMER 9.70 56.0 9.7 5.7 200.0 2.220 81.0 MUD AT BOTTOM HOLE TEMPERATURE (BHT): MUD FILTRATE AT MT: MUD FILTRATE AT BHT: MUD CAKE AT MT: MUD CAKE AT BHT: NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): REMARKS: REPEAT PASS. $ CN WN FN COUN STAT BP EXPLORATION (ALASKA) P-12A-PH PRUDHOE BAY NORTH SLOPE ALASKA .990 2.930 .000 2.360 .000 THERMAL SANDSTONE .00 6.750 1.5 200.0 55.0 .0 60.0 .0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 20 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR AC 68 1 GAPI 2 AC AC 68 1 US/F 3 CHT AC 68 1 LB 4 TTEN AC 68 1 LB 5 SPD AC 68 1 F/MN 6 RFOC DIFL 68 1 OHMM 7 RILM DIFL 68 1 OHMM 8 RILD DIFL 68 1 OHMM 9 VILM DIFL 68 1 MV 10 VILD DIFL 68 1 MV 11 CILD DIFL 68 1 MMHO 12 RT DIFL 68 1 OHMM 13 DI DIFL 68 1 IN 14 TEMP DIFL 68 1 DEGF 15 SP DIFL 68 1 MV 16 CNC 2435 68 1 PU-S 17 CNCF 2435 68 1 PU-S 18 CN 2435 68 1 PU-L 19 LSN 2435 68 1 CPS 20 SSN 2435 68 1 CPS 4 4 06 969 49 6 4 4 48 852 89 1 4 4 95 558 30 1 4 4 95 558 30 1 4 4 61 094 30 1 4 4 27 515 24 6 4 4 06 213 78 0 4 4 04 903 06 0 4 4 04 522 10 6 4 4 04 522 10 6 4 4 34 704 23 6 4 4 04 903 06 0 4 4 06 213 78 0 4 4 40 467 34 0 4 4 53 419 67 0 4 4 98 211 23 1 4 4 98 211 23 1 4 4 52 326 75 5 4 4 84 023 70 1 4 4 83 368 34 1 80 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data ~Recor~ ~ 131 Tape File Start Depth = 9394.000000 Tape File End Depth = 9002.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 83366 datums Tape Subfile: 4 210 records... Minimum record length: Maximum record length: 44 bytes 1014 bytes Tape Subfile 5 is type: LIS 95/ 3/29 01 **** REEL TRAILER **** 95/ 3/30 01 Tape Subfile: 5 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Thu 30 MAR 95 3:26p Elapsed execution time = 12.08 seconds. SYSTEM RETURN CODE = 0