Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout203-030CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. You don't often get email from tyson.shriver@hilcorp.com. Learn why this is important From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: L-111 (PTD# 202-030) Return to Produced Water Injection and Evaluate for TxIA Communication Date:Monday, May 6, 2024 3:11:38 PM From: Wallace, Chris D (OGC) Sent: Monday, May 6, 2024 3:10 PM To: Tyson Shriver <Tyson.Shriver@hilcorp.com>; Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov> Cc: Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Subject: RE: L-111 (PTD# 202-030) Return to Produced Water Injection and Evaluate for TxIA Communication Tyson, A 60 days water only injection for monitoring and diagnostics is approved. Thanks and Regards, Chris Wallace, Sr. Petroleum Engineer, Alaska Oil and Gas Conservation Commission, 333 West 7th Avenue, Anchorage, AK 99501, (907) 793-1250 (phone), (907) 276-7542 (fax), chris.wallace@alaska.gov CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Chris Wallace at 907-793-1250 or chris.wallace@alaska.gov. From: Tyson Shriver <Tyson.Shriver@hilcorp.com> Sent: Monday, May 6, 2024 1:08 PM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov> Cc: Oliver Sternicki <Oliver.Sternicki@hilcorp.com>; PB Wells Integrity <PBWellsIntegrity@hilcorp.com> Subject: L-111 (PTD# 202-030) Return to Produced Water Injection and Evaluate for TxIA Communication Mr. Wallace, Well L-111 (PTD# 202-030) is a Kuparuk Borealis WAG injector that is currently classified as Not Operable. The well operated under Administrative Approval AIO 24B.002 for TxIA communication when the well was on MI gas injection, which allowed for water injection only. The AA was active from September 2008 to June 2013 when a tubing patch was set over a possible leak at GLM #3 and the AA was canceled. L-111 continued WAG injection up until April 2023 when the tubing patch was pulled for downhole wellwork. Hilcorp would like to place the well back on water injection as follows: 1. Pull waterflood regulator valves from St #1 & 2. Replace with dummy valves. 2. Perform an MIT-T to 2,500 psi. 3. Pull tubing tail plug and drift to TD. 4. Reclassify well to “Under Eval” and return well to water injection (Kuparuk Borealis Oil Pool). 5. Perform AOGCC online MIT-IA. 6. Monitor and manage IA re-pressurization while Under Eval for up to 60 days. A 60-day under evaluation period is being requested to monitor the well over a longer sustained injection timeframe. Any early IA re-pressurization may be due to thermal expansion and not due to communication of Tubing x Inner Annulus while on produced water injection. By the end of the 60- day under evaluation period, Hilcorp will 1) apply for an AA for PWI only or 2) re-set a patch over GLM #3. Please let me know if you agree with this plan forward as well as any additional documentation that would be required prior to reclassifying the well “Under Eval” and placing on produced water injection. Tyson Shriver Hilcorp Alaska PBW GC2 OE (L, V, W, Z) o: 907-564-4542 c: 406-690-6385 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. 4-1116" CIW VYE-L EAD= FMC ACTUATOR= NA KB. E-EV = 76.4' BF. E_EV = 5207. KOP= 800' Max Angle = 40" Q 1595' Datum MD = 7075' r1.r.,...TVn= cgnn, cc 9-5/8" CSG, 404, L-80, D = 8.835" 2922' Minimum ID =2.46" @ 4189' 4-1 /2" KB PATCH 4-12" TBG, 12.6#, L-80, .0152 bpf, D = 3.958" 1--1 4375' PERFORATION SUMMARY REF LOG TCP PERF ANGLE AT TOP PERF: 9- @ 4546' Note: Referto Production DB for historical perf data SIZE SPF INTERVAL O NS z DATE 45/8" 5 4546-4586 O 03/04/02 45/8' 5 4616 - 4636 O 03/04/02 45/8" 5 4660-4673 O 03/04/02 45/8" 5 4719 - 4729 O 03/04/02 45/8" 5 4768-4805 O 03/04/02 45/8" 5 4832 - 4852 O 03/04/02 2-12' 6 7014 - 7038 C 03=2 2-12" 6 7047-7052 C 0322/02 2-12" 6 7070 - 7078 C 0322/02 3-1/2" TBG, 9.2#, L-80 TCII, .0087 bpf, D = 2.992" 6838' PBTD 7505' - 7" CSG, 26#, L-80, .0383 bpf, ID = 6276" 7589' L-111 SAFETY NOTES: H2S READINGS AVERAGE 125 ppm WHEN ON MI. WELL REQUIRES A SSSV WHEN ON MI. 974' 9-5/8" TAM PORT COLLAR 2266' 4-12" HES X NP, ID = 3.813" GAS LFT MANDRELS 3TI MD I TVD I DEVI TYPE I VLV LATCH PORT LT4TE 4 3842 1 3541 4 1 KBG2 *DMY I BK-5 0 07/14/0 3 4199 3896 8 KBG2 •DMY I BK-5 0 07/14/08 STA # 3 & # 4 = DMY'S HAVE EXTENDED PKG 4-12" HES X NP, ID = 3.813" 437T 4-12" X 3-12" XO, ID = 2.992" WATERFLOOD MANDRELS ST MD I TVD I DEV I TYPE I VLV I LATCH PORT DATE 2 1 4418 4478 4113 4172 8 7 1 MMG-W MMG-W I AL-WFR AL-WFR I RK RK 19 19 04/052 041052 SCHRADER - ORION UNAUTHORIZED FOR PWI OR WAG INJECTION 5243' 7" TAM PORT COLLAR — 6768' 3-12" HESX NP, ID = 2.813" 6780' 7" X 4-12" BCR S-3 FKR ID = 3.875" 6786' 4-1/2" X 3-12" XO, ID=2.950" 6806' 3-12" HES X NP, ID = 2.813" 6826' 3-12" HES X NIP, ID=2.813" 6826' 3-12" RMX w/ DMY PRONG (04/05,73) 6838' 3-12' WLEG, ID=2.905- ELMD TT NOT LOGGED 6892' FRP Ji W/ RA TAG _ KUPARUK -BOREALIS AUTHORIZED FOR WAG INJECTION 7362' RPUTwI RATAG DATE REV BY COMMENTS DATE REV BY COMMENTS 03106/02 ORIGINAL COMPLETION 04/1123 CP/JMD PULLED PATCH (04/0323) 02/15/11 MB/JMD ADDED SSSV SAFETY NOTE 04/1123 CP/JMD WFR CIO04/0523 0729/11 JCM/PJC SET PATCH(0724/11) 01/17/12 TMWJMD ADDED H2S SAFETYNOTE 07A7/12 SET/PJC SET BP 0802/12 THH/JMD PULL BP(07/31112) BOREALIS. UNIT WELL: L-111 PERMIT No:'2020300 API No: 50-029-23069-00 SEC 34, Tl2N, Rl 1 E 2339' NSL & 387T WEL Hilcorp North Slope, LLC ") ) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. Q.O:5' - 030 Well History File Identifier Organizing (done) o T wo- si ded III" 111I1111 "1111 o Rescan Needed ~ i RESCAN DIGITAL DATA ~skettes, No. , o Other, NolType: OVERSIZED (Scannable) o Maps: o Other Items Scannable by a Large Scanner o Color Items: o Greyscale Items: o Poor Quality Originals: OVERSIZED (Non-Scannable) o Other: o Logs of various kinds: NOTES: BY: Helen( Maria ") .. I o Other:: " Date: 4':J.1 tJS/sl YI1~ Project Proofing BY: Helen (Mari~ I Date: if :J.1f 06"" 151 MP I I I X 30 = 3 0 + ~ Z = \OTAL PAGES .¿; 7 ( aunt d"Oe) no, t in( lude cover sheet) WI f) Date: if, a..7.. {)<Sïsl /1 I Scanning Preparation BY: Helen ~ Production Scanning Stage 1 Page Count from Scanned File: ð?5 (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: V YES NO Helen .(Maria ) Date:Lf- a.c¡ D~ 151 m p If NO in stage 1, page(s) discrepancies were found: YES NO BY: Stage 1 BY: Helen Maria Date: 151 I III I I I II Date: 151 Quality Checked III1111111111111111 Scanning is complete at this point unless rescanning is required. ReScanned BY: Helen Maria Comments about this file: • by BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 #, May 20, 2012 Mr. Jim Regg 4iD AU akYk Alaska Oil and Gas Conservation Commission 333 West 7 Avenue 03- 030 Anchorage, Alaska 99501 pa- 574-13. Subject: Corrosion Inhibitor Treatments of GPMA PM -2 Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPMA PM -2 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • 0 BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) GPMA PM-2 Date: 04/3W2012 Corrosion Vol. of cement Final top of Cement top Corrosion inhibitor/ sealant Well Name PTD # API # Initial top of cement pumped cement off date inhibitor date ft bbls ft na gal P2-01 1970730 50029227610000 0.3 NA 0.3 NA 1.70 6/22/2009 P2-03 1970440 50029227490000 2.0 NA 2.0 NA 10.20 6/22/2009 P2-04 1981560 50029229070000 1.0 NA 1.0 NA 5.10 6/22/2009 P2-06 1931030 50029223880000 4.0 NA 4.0 NA 30.60 6/22/2009 P2 -07 1940580 50029224690000 2.0 NA 2.0 NA 13.60 6/22/2009 P2-08A 2061690 50029228960100 0.8 NA 0.8 NA 4.30 6/21/2009 P2 -09 1980660 50029228760000 0.3 NA 0.3 NA 0.85 6/21/2009 P2 -10 1980970 50029228860000 0.3 NA 0.3 NA 1.70 6/21/2009 P2 -11A 2060260 50029229230100 3.5 NA 3.5 NA 69.70 6/21/2009 P2 -12 1931150 50029223950000 Sealed conductor NA NA NA NA NA P2 -13 1970600 50029227570000 0.5 NA 0.5 NA 2.60 6/21/2009 P2 -14 1981050 50029228880000 1.5 NA 1.5 NA 10.20 6/21/2009 P2 -15A 2070320 50029224090100 Sealed conductor NA NA NA NA NA P2 -16 1931230 50029223970000 3.0 NA 3.0 NA 28.10 6/20/2009 P2 -17 1981370 50029229020000 0.8 NA 0.8 NA 3.40 6/20/2009 P2 -18 1940600 50029224710000 0.8 NA 0.8 NA 2.60 6/20/2009 P2 -19A 2070120 50029227650100 0.3 NA 0.3 NA 0.90 6/20/2009 P2 -20 1960590 50029226640000 0.5 NA 0.5 NA 2.60 6/20/2009 P2 -21 1940530 50029224670000 0.8 NA 0.8 NA 3.40 6/20/2009 P2 -22 1972490 50029228500000 1.0 NA 1.0 NA 7.70 6/20/2009 P2 -23 1940320 50029224530000 1.3 NA 1.3 NA 11.10 6/20/2009 P2 -24 1980080 50029228540000 1.5 NA 1.5 NA 10.20 6/15/2009 P2 -25 1971110 50029227760000 1.8 NA 1.8 NA 17.90 6/10/2009 P2 -27 1971250 50029227850000 1.3 NA 1.3 NA 8.50 6/10/2009 P2 -28 1950440 50029225510000 3.3 NA 3.3 NA 37.40 4/18/2012 P2 -29 1931470 50029224070000 10.3 NA 10.3 NA 71.40 6/15/2009 P2 -30 1920950 50029222890000 2.8 NA 2.8 NA 17.90 6/10/2009 P2 -31 1940360 50029224560000 2.2 NA 2.2 NA 21.30 6/20/2009 P2 -32 1951350 50029225930000 Surface casing leak NA NA NA NA NA P2 -33B 1972310 50029228120200 2.0 NA 2.0 NA 16.60 6/9/2009 P2 -34 1950660 50029225580000 1.5 NA 1.5 NA 11.50 6/9/2009 P2-35 1951790 50029226200000 1.0 NA 1.0 NA 13.60 6/9/2009 P2 -36A 2060220 50029228010100 1.1 NA 1.1 NA 6.00 6/9/2009 P2 -37A 2050570 50029225760100 2.0 NA 2.0 NA 23.00 6/9/2009 P2 -39 2111230 50029234540000 0.8 NA 0.8 NA 10.20 4/30/2012 P2-40 1972260 50029228370000 0.5 NA 0.5 NA 5.10 6/9/2009 P2-41 1952050 50029226330000 1.5 NA 1.5 NA 17.00 6/9/2009 P2-42 1931430 50029224050000 19.3 NA 19.3 NA 121.60 6/20/2009 P2-43 2050240 50029232500000 0.8 NA 0.8 NA 6.00 6/8/2009 P2-44 1960630 50029226660000 2.3 NA 2.3 NA 23.80 6/8/2009 P2-45B 2080210 50029227690200 0.8 NA 0.8 NA 5.10 6/8/2009 P2-46 1931320 50029224010000 2.3 NA 2.3 NA 25.50 6/8/2009 P2 -47 1951900 50029226280000 0.0 NA 0.0 NA NA NA P2-48 1921260 50029223090000 0.2 NA 0.2 NA 1.70 4/18/2012 P2-49 1920240 50029222520000 2.5 NA 2.5 NA 18.70 6/7/2009 P2 -50B 1950960 50029222610200 2.0 NA 2.0 NA 23.00 6/8/2009 P2 -51 1920380 50029222620000 0.3 NA 0.3 NA 0.85 6/7/2009 P2 -52 1972010 50029228260000 3.8 NA as NA 47.60 6/7/2009 P2 -53 1960410 50029226560000 2.0 NA 2.0 NA 21.30 6/7/2009 -4 P2 -54A 2030300 50029224700100 0.8 NA 0.8 NA 3.40 6/7/2009 P2 -55 1920820 50029222830000 4.0 NA 4.0 NA 79.90 6/22/2009 P2 -56 1951620 50029226100000 2.8 NA 2.8 NA 17.90 6/7/2009 P2 -57A 2022140 50029221830100 15.5 NA 15.5 NA 77.40 6/22/2009 P2 -58 1900080 50029220000000 Sealed conductor NA NA NA NA NA P2 -59A 1982010 50029220960100 Sealed conductor NA NA NA NA NA P2-60 1910910 _ 50029221920000_ 8.3 NA 8.3 NA 56.10 3/13/2012 • • '°-~ -- MICROFILMED 03/01/2008 DO NOT PLACE ~~ -~ .: _ _~,; ~~ - „~: ANY NEW MATERIAL UNDER THIS PAGE F:~LaserFiche\CvrPgs_Inserts~Iicrofilm Marker.doc RECEIVED ALASKA OIL AND GAS CONSERVATION COMMISSION MAY 0 6 2005 REPORT OF SUNDRY WELL OPERATIO~~aOiJ¿tGa~Cor; . 1. Operations Performed: 3. Cumm,ss Abandon 0 Repair WellD PluÇJ PerforationsD Stimulate 0 ~ge Alter CasingD Pull TubingD Perforate New Pool 0 WaiverD Time ExtensionD Change Approved ProgramD Operation ShutdownD Perforate [K] Re-enter Suspended WellD ) STATE OF ALASKA ') 2. Operator Name: 3. Address: BP Exploration (Alaska), Inc. 4. Current Well Class: Development Œ] Exploratory D 5. Permit to Drill Number: 203-0300 6. API Numbe 50-029-22470-01-00 P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): 45.62 8. Property Designation: ADL-034624 11. Present Well Condition Summary: Stratigraphic 0 Service D 9. Well Name and Number: P2-54A 10. Field/Pool(s): Pt Mcintyre Oil Field I Pt Mcintyre Oil Pool Total Depth measured 11692 feet true vertical 8976.7 feet Effective Depth measured 11600 feet true vertical 8912.2 feet Plugs (measured) Junk (measured) None None Casing Length Size MD TVD Burst Collapse Conductor 80 20" 91.5# H-40 32 112 32.0 112.0 1490 470 Liner 4845 5-1/2" 17# 13Cr80 5711 - 10556 5034.5 - 8638.9 7740 6280 Liner 1137 2-3/8" 4.7# L-80 10469 - 11606 8571.8 - 8915.9 11200 11780 Production 10767 7-5/8" 29.7# 13CR80 31 - 10798 31.0 - 8828.5 6890 4790 Surface 3908 10-3/4" 45.5# L-80 32 - 3940 32.0 - 3720.5 5210 2480 Measured depth: 11270 -11290,11290 -11310,11335 -11420,11460 -11490,11550 -11580 True vertical depth: 8847.89 - 8843.67,8843.67 - 8840.62,8838.57 - 8844.43,8852.47 - 8860.74,8884.6 - 8900.37 Tubinq ( size, ÇJrade, and measured depth): 4-1/2" 12.6# 13Cr80 3-1/2" 9.2# 13Cr80 @ 29 @ 5673 5673 S(ò~i\'NED MAY 1 .1 200.5 Packers & SSSV (type & measured depth): 3-1/2" Baker SABL-3 Packer 5-1/2" Baker ZXP Hydro Set Packer @ 10505 @ 5711 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: Prior to well operation: Subsequent to operation: Oil-Bbl 396 917 Representative Daily Average Production or Injection Data Gas-Met Water-Bbl Casing Pressure 0.06 2390 2109 1.08 3279 1564 Tubing Pressure 729 721 13 Copies of Logs and Surveys run _ Daily Report of Well Operations_ ! 15. Well Class after proposed work: Exploratory D 16. Well Status after proposed work: Oil Œ] GasD Development ŒI ServiceD 14. Attachments: Signature Garry Catron Garry Catron t1~, WAG D GINJD WINJD WDSPLD Prepared by Garry Catron (907) 564-4657. Sundry Number or N/A if C.O. Exempt: N/A 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Printed Name Title Production Technical Assistant ~ Phone 564-4657 Date 5/4/05 Form 10-404 Revised 4/2004 () \ \ l- RBDMS BFl MAY 1 0 2005 ) ) P2-54A DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 03/05/05 Perforate 112901-1131016 SPF 03/06/05 Perforate 112701-11290.6 SPF FLUIDS PUMPED BBLS 140 60 / 40 Methanal / Water 140 TOTAL Page 1 ¡:REE ='. WELLHEAD = V^","'/,..,.",.,.,."""".,..,...,..."""..,.,..... ACTUATOR = KB. ELEV = BF. ELEV = KOP = 1500' .. .....,. ... ,w'"" Max Angle = Wi:) @ 1117[:)' ,,,,,,,,,,.,,..,,..,,".... ,.",,"'" , """...., "".., ". .... Datum MD = 108'jß' Datum TVD = 8800' SS 4-1/16" CrN FMC BAKERC 46.95' ) 110-3/4" CSG, 45.5#, L-80, ID = 9.953" l-i 3940' Minimum ID = 1.92" @ 10469' 2-3/8" BAKER DEPLOY SLEEVE 14-1/2" TBG, 12.6#, 9-CR, .0152 bpf, ID = 3.958" l-i 5666' I 3-1/2" TBG, 9.2#, 13-CR, .0087 bpf, ID = 2.992" l-i 10500' I P2-54A ) SAFETY NOTES: 4·1/2" & 3-1/2" CHROMETBG. 7-5/8" CSGXO'S FROM L-80 TO 13 CHROME @ 10039'. . 2185' 1-14-1/2" CAMCO TRCP-4A, TRSV, ID = 3.812" I~ ~ ST MD 1 4331 2 561 0 3 7216 4 8195 5 9011 6 9672 7 1 041 3 GAS LIFT MANDRELS DEV TYPE VLV LTCH PORT DATE 43 TMPDX DOME BK 16 03/29/03 42 TMPDX DOME BK 16 03/29/03 43 KBG-2-9 SO INT 24 03/29/03 42 KBG-2-9 DMY INT 0 03/05/03 42 KBG-2-9 DMY INT 0 03/05/03 42 KBG-2-9 DMY INT 0 03/05/03 40 KBG-2-9 DMY INT 0 03/05/03 L TVD 4010 4960 6141 6875 7478 7972 8529 \ , 5668' ~14-1/2" x 3-1/2" TBG XO, ID = 2.992" I 5711' H 7-5/8" x 5-1/2" BKR ZXP PKR, ID = 4.813" 5726' H 7-5/8" X 5-1/2" BKR LNR HGR, ID = 4.875" I I 1 0469' I~ 2-3/8" BKR DEPLOY SL V, ID = 1.920" I 10478' H3-1/2" HES x NIP, ID = 2.813" I 10500' 1-45-1/2" x 3-1/2" BKR SABL-3 PKR, ID = 2.780" 15-112" SCAB LNR, 17#, L-80, ID = 4.892" H 10556' I"", PERFORA TION SUMMA RY REF LOG: MCNL/GR/CCL ON 03/27/03 A NGLE AT TOP PERF: 92° @ 11270' Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DA TE 1-9/16" 6 11270-11310 0 03/06/05 1-9/16" 4 11335 - 11420 0 03/27/03 1-9/16" 4 11460 - 11490 0 03/27/03 1-9/16" 4 11550 - 11580 0 03/27/03 TOPOF FISH (TT STUB) 03/07/03 l-i 10826' I PBm l-i 11080' 7-5/8"CSG,29.7#,13-CR,ID=6.875" l-i 11164' DATE 05/13/94 04/19/00 03/26/03 03/29/03 01/10/05 03/06/05 REV BY COMMENTS ORIGINAL COM PLETION RWO CJSITLH CTD SIDETRACK (P2-54A) JCM/TLH GL V UPDATE RLWITLP MIN ID BOX CORRECTION KEYITLH ADPERF DATE 10722' 1-17-5/8" MARKER JOINTS (2 JTS = 39') I MILLOUT WINDOW 10798' - 10802' I PBTD l-i 11600' 12-3/8" LNR, 4.6#, L-80, .0039 bpf, ID = 1.995" l-i 11606' REV BY COMMENTS POINT MClNTY RE UNIT WELL: P2-54A PERMIT No: 2030200 API No: 50-029-22470-01 SEC 14, T12N, R14E, 550' SNL & 1233' EWL BP Exploration (Alaska) )ì~~è~) DATA SUBMITTAL COMPLIANCE REPORT 4/1/2005 Permit to Drill 2030300 Well Name/No. PRUDHOE BAY UN PTM P2-54A Operator BP EXPLORATION (ALASKA) INC fø ¿ )W /1.¡¡~ ÀÅJ~ > API/..io. 50-029-22470-01-00 MD 11692 /' TVD 8977./ Completion Date 3/27/2003 /' Completion Status 1-01L Current Status 1-01L UIC N ---- REQUIRED INFORMATION Mud Log No Samples No Directional Survey Yes ---------~-- DATA INFORMATION Types Electric or Other Logs Run: MWD, Memory induction, Memory CNL, GR, CCL (data taken from Logs Portion of Master Well Data Maint) Well Log Information: Logl Electr ; Data Digital Dataset Log Log Run Interval OH/ _/ Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments ¡-------- An H2S Measurement is ! required to be submitted. This record automatically created from Permit to Drill Module on: 2/26/2003. A Directional Survey Log is I required to be submitted. This record automatically I created from Permit to Drill I Module on: 2/26/2003. I 4ED 0 Asc 12039 US Vorification .. LZ 2. ~ 10203 11 632 Open 4/21/2003 Sonic, CCL, GR .J..G"g 12039 I nduction/Resistivity 25 Blu 10200 11622 Open 4/21/2003 Sonic, CCL, GR ~ 0 Asc 12040 US VbiificatiQn } ¿;..,¡.J' 0.. ('^\ 9004 10819 Open 4/21/2003 So~CL, GK--- ¡£6 0 Asc 12041 .~ IS Vorificati~,r vJ ì..J~ .l.~ 9004 10819 Open 4/21/2003 Sornr., CeL, GR :¿g 12039 Sonic 25 Blu 10200 11622 Open 4/21/2003 Sonic, CCL, GR uD D] $ Directional Survey 11175 11692 Open 5/15/2003 -~"; ~ b-: II¡;. '-Rp ~ Directional Survey 11175 11692 Open 5/15/2003 : 0 0 Directional Survey 10798 11750 Open 5/15/2003 PB1 bv/ Directional Survey 10798 11750 Open 5/15/2003 PB1 ¡ Log Production 2 Blu 9084 12046 Case 7/23/2003 CULLED ! Log Casing collar locator 2 Blu 9084 12046 Case 7/23/2003 CULLED I Neutron i Log 2 Blu 9084 12046 Case 7/23/2003 CULLED krr C Y Í--l S 12136 US V~rlf1catloll . /"'tLI"t'v 10344 11597 Case 7/23/2003 ~ C Pds 12136 Neutron 2 10344 11597 Case 7/23/2003 Compensated Neutron Log - Memory I GRlCCUCNL ! L_______ DATA SUBMITTAL COMPLIANCE REPORT 4/1/2005 Permit to Drill 2030300 Well Name/No. PRUDHOE BAY UN PTM P2-54A Operator BP EXPLORATION (ALASKA) INC API No. 50-029-22470-01-00 MD 11692 TVD 8977 Completion Date 3/27/2003 Completion Status 1-01L Current Status 1-01L UIC N ~·C Pds LA21' 36 Casing collar locator 2 10344 11597 Case 7/23/2003 Compensated Neutron I Log - Memory ; I GRlCCUCNL ~ ~ron 2 Blu 10344 11597 Case 7/23/2003 Compensated Neutron [ Log - Memory I GRlCCUCNL I . h:õ9 ~ng collar locator 2 Blu 10344 11597 Case 7/23/2003 Compensated Neutron , Log - Memory I I GRlCCUCNL I lED C Tf'"'t.... I ~ 12453 Gamma Ray 10688 11692 Open 3/16/2004 Gamma Ray - MWD -- ~ C Pds 12453 Gamma Ray 10688 11692 Open 3/16/2004 Gamma Ray - MWD ! ~t Vv.r"\. Gamma Ray 7V i ') 10688 11692 Open 3/16/2004 Gamma Ray - MWD [ I~g Gamma Ray MO Blu 10688 11692 Open 3/16/2004 Gamma Ray - MWD ~8J C Pdt 12483 Gamma Ray 25 10688 11750 Open 3/26/2004 Gamma Ray MWD - PB1 0g Gamma Ray ì'V' Ó 25 Blu 10688 11750 Open 3/26/2004 Gamma Ray MWD - PB1 4-Eð C Lis 12483 Gamma Ray 10688 11750 Open 3/26/2004 Gamma Ray MWD - PB1 ¡ I i~~ Gamma Ray ¡VIf) 25 10688 11750 Open 3/26/2004 Gamma Ray MWD - PB1 L.__.__.___ Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments ADDITIONAL INFORM~N Well Cored? Y ^.'ttJ Chips Received? ~ Daily History Received? Qµ (9N -- Formation Tops Analysis Received? ~7 ------ ------- --.-- Comments: Compliance Reviewed By: ,~ Date: )j ÆJ-p ~b ----- -~-- ~. ) Transmittal Form INTEQ To: AOGCC 333 West 7th Ave, Suite 100 Anchorage, Alaska 99501 Attention: Lisa Weepie Reference: P2-54APB1 Contains the following: 1 LDW 0 Compact Disc \ do 1-\ ~ (Includes Orapþic Image files) 1 LDWO lister summary 1 blueline - OR/Directional Measured Depth Log 1 blue line - OR/Directional TVD Log LAC Job#: 447646 ) &03 -'Q3C) ,&.. BAKER HUGHES Anchorage GEOScience Center Sent By: Glen Borel Date: Mar 19, 2004 Received B;~..2) \~. ~.::..~~ Cì ""~ Date: PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COpy FAX: (907) 267-6623 Baker Hughes INTEQ 7260 Homer Drive Anchorage, Alaska 99518 Direct: (907) 267-6612 FAX: (907) 267-6623 '- \~~~ff\ ~ RECEIVED ~1AR 2 6 2004 oJa5~a ou & Gas Cons. CommiIian I( ñrJuxage ô'I", ,~; t t.'".. ~ 1"-~:::~~:;;~:;~::;~;;;:~~::::i'1 ;.~~"':~;;,~:~,w.," ',~:.. '1 .~:;"':}~,;'Þ.;;.;;~:.._~-".. ·.;:I·¡ '1UIII;&I':"i'( ...~(,~"..,~,;;... ,....'...."..' ."',"',,",",./", ...,~... 1 ! :::::::-':;;1 ;=;~---~~:~,t;;-~---~:: -- i~:;1:~-R~:;"~~<~-_:'~~:;~~: ¡~¡3·-i--j.~i~·_ !':\~;';5: . ...'~. ,--",---.--~--- :...~~- ) Transmittal Form INTEQ To: AOGCC 333 West 7th Ave, Suite 100 Anchorage, Alaska 99501 Attention: Lisa Weepie Reference: P2-54A Contains the following: ) Q\ l-\63 1 LDWG Compact Disc CY (Includes Graphic Image files) 1 LDWG lister summary i ') â03 --020 r&l. BAKER HUGHES Anchorage GEOScience Center 1 blueline - GR/Directional Measured Depth Log 1 blueline - GR/Directional TVD Log LAC Job#: 447646 Sent By: Glen Horel ~ - ~'- Received By: \'ôJ~ ìý\. \,~~:I ~.J"~ Date: Mar 8, 2004 Date: PLEASE ACKNOWLEDGE RECEIPT BY SIGNING & RETURNING OR FAXING YOUR COPY FAX: (907) 267-6623 Baker Hughes INTEQ 7260 Homer Drive Anchorage, Alaska 99518 Direct: (907) 267-6612 FAX: (907) 267-6623 R~~f\\(h RECEIVED ~.; ·~î 1 6 ""04 : ~. ..\~ .~ ::.C' '~~Jaska Oil & Gas Cons. Commislo AnduN8ge n [ç~:::~:;~:~:;~;;~:;~::I] ..... .... ..... ':~',~'.,...'~....' ... ~,.'...'.~ .~·II :=~ ····:;:·~~,..;~t·····~·;·····~~:¿·¡ .... "" ".. "",¡ I I I I I -'- , , ".~ J,::::::;::" .. .-:~ Schlumberger NO. 2890 Alaska Data & Consulting Services 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 A TTN: Beth Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Color Well Job# Log Description Date Blueline Prints CD D.S. 2-05A 23376 MCNL 06/02/03 1 1 la. )?:>n H-27A 23319 MCNL 05/09/03 1 1 I~J.~~ E-02A 23275 MCNL 03/15/03 1 1 NK-62A 23277 MCNL 04/27/03 1 1 1 ~ /.~ I E-01 A 23280 MCNL 04/12/03 1 1 P2-54A 23274 MCNL 03/27/03 1 1 ~).3~ D-22B 23348 MCNL OS/22/03 1 1 J~/\-;1 D.S. 2-088 MEM PROD PROFILE 05/31/03 1 J-26 LDL 06/20/03 1 D.S.2-29A LDL 06/22/03 1 D.S.15-28 LDL 06/21/03 1 D.S. 12-20 LDL 06/03/03 1 J-08 LDL 06/26/03 1 D.S. 2-25 PRODUCTION PROFILE 06/07/03 1 PSI-01 TEMPERATURE WARMBACK LOG 06/09/03 1 PSI-06 TEMPERATURE WARMBACK LOG 06/13/03 1 PSI-09 TEMPERATURE WARMBACK LOG 06/19/03 1 K-317B SBHPSURVEY 04/05/03 1 C-04A SBHP SURVEY 06/26/03 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Schlumberger GeoQuest 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Beth RECEIVED 07/02/03 """"=-,,,,/ .~ Date Delivered: JULdlS 2003 Received ~ ~ L/~ ~ G ~ ~~/ '-... Alaska Q¡~¡ & Gas Cons. Commi88ton Anchorage ) ) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well ~ Oil 0 Gas 0 Suspended 0 Abandoned 0 Service 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 551' SNL, 1233' EWL, SEC. 14, T12N, R14E, UM At top of productive interval 3808' SNL, 446' EWL, SEC. 13, T12N, R14E, UM X = 686057, Y = 5994885 10. Well Number At total depth 4575' SNL, 546' EWL, SEC. 13, T12N, R14E, UM X = 686177, Y = 5994120 11. Field and Pool 6. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Point Mcintyre KBE = 45.62' ADL 034624 12. Date Spudded 13. Date T.D. Reached 14. Date Camp., Susp., or Aband. 3/20/2003 . 3/24/2003 .. 3/27/2003 t 17. Total Depth (MD+ TVD) 18. Plug Back Depth (MD+ TVD) 19. Directional Survey ~ 11692 8977 FT 11600 8912 FT ~ Yes 0 No 22. Type Electric or Other Logs Run MWD, Memory Induction, Memory CNL, Classification of Service Well 7. Permit Number 203-030 8. API Number 50-029-22470-01 9. Unit or Lease Name X = 681483, Y = 5998032 Point Mcintyre P2-54A 23. CASING SIZE 20" 10-3/4" 7-5/8" 5-1/2" 2-3/8" WT. PER FT. 91.5# 45.5# 29.7# 17# 4.6# GRADE H-40 NT80LHE L-80 113Cr L-80 L-80 GR, CCL CASING, LINER AND CEMENTING RECORD SETTING DEPTH HOLE Top BOTTOM SIZE CEMENTING RECORD 30' 110' 30' ,260 sx Arctic Set (Approx.) 35' 3940' 13-1/2" 1166 sx CS III, 375 sx Class 'G' 31' 10798' 9-7/8" 590 sx Class 'G' 5726' 10556' Scab ,219 sx Class 'G' 10469' 11606' 2-3/411 x 3" 69 sx Class 'G' 15. Water depth, if offshore 16. No. of Completions NI A MSL One 20. Depth where SSSV set 21. Thickness of Permafrost 2185' MD 1750' (Approx.) ...,-µ~ /é/,¡7flß" ~o ø/ B-r>' 7r-D AMOUNT PULLED 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 1.56" Gun Diameter, 4 spf MD TVD 11335' - 11420' 8839' - 8845' 11460' - 11490' 8853' - 8861' ... '..""" ''''."..,\ j.;'<, :,';:' .~:T: 'IN ) 11550' - 11580' 8885' - 8901': ,I': ;', '1:: :: ~ ~-.¿~Ž"j¿3; , 'it)'iED ~ -,-,~---............... .~ 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2", 12.6#, 9Cr 5666 3-1/211,9.2#, 13Cr 10500' 5711' & 10500' ACID, FRACTURE, CEMENT SaUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 2500' Freeze Protected with MeOH MD TVD of'" , )'10.1 "'.T...· "~' It''":~ ,...'" .;...;............~ ". 26. ~.~ .." ~~~. . '1"1¡',ìI:1-!~.~.,~~ .......,.,.,.".~.W",' ;','~.' ;~~,:t}".'I;¡..~.~,:"~.'.',.",..,:.,. .' f!'t~\ . '"":1j,'·:t:>~ Ii. . '.~:':.; . .~~~., ~:::t,':i ~,~'t' :' ''''~'''','. !"f.>", ". ,:.": ::\' ",....\..~':~¡,;.....-",',\' 27. Date First Production March 29,2003 Date of Test Hours Tested 4/24/2003 5.7 PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) Gas Lift PRODUCTION FOR TEST PERIOD OIL-BBL 1,414 OIL-BBL GAs-McF 1,343 GAs-McF WATER-BBL 4,315 WATER-BBL CHOKE SIZE GAS-OIL RATIO 110 950 OIL GRAVITY-API (CORR) Flow Tubing Casing Pressure CALCULATED Press. 636 24-HoUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit corEtf~Ws:;_ ~'- "¿' No core samples were taken. ", -I' '-'._, RBDMS BfL (:r:: M~Y R 2HÐ3 f " . ¡ . . "1: . " ~ '~ \: I' /~"~~::~:~:~:::L::l :~:__":: :> ". ..,.. Form 10-407 Rev. 07-01-80 o ~ ~ Gjfff'-. Submit In Duplicate ) 29. Geologic Markers Marker Name Measured Depth Kuparuk 107901 LC3 10858' LC2 11012' LC2 11092' LC2 11494' LB2-4 11574' LB1 11622' Miluveach 11623' 31. List of Attachments: ) 30. Formation Tests True Vertical Depth Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. 88221 8867' 88941 88861 8862' 8897' 8926' 8927' Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Terrie Hubble -1O..A.I\.,ÌQ. ~ Title Technical Assistant Date 05· 07 ..D"3 P2-54A 203-030 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. Drilling Engineer: Mark Johnson, 564-5666 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (OF, KS, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 28: If no cores taken, indicate 'none'. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. Form 10-407 Rev. 07-01-80 ) ) ARGO OperationsS.ummaryReport Page 1 of 10 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P2-54 P2-54 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 3/12/2003 Rig Release: 3/27/2003 Rig Number: Spud Date: 4/18/1994 End: 3/28/2003 Date . From - To Hours Task Code NPT Phase Description of Operations 3/17/2003 00:00 - 02:00 2.00 BOPSUR P PRE Accept rig at 00:00 on 3/17/2003. NU BOP. 02:00 - 03:00 1.00 BOPSURP PRE Install drip pan. MU 2" test joint. Take on fluid. 03:00 - 10:00 7.00 BOPSURP PRE Test BOPE to 250 / 3,500 psi as per BP policy and AOGCC regulations. Witness of test waived by Chuck Scheeve of AOGCC. Top 2" combo rams not holding. Inspect rams and verify deminsions. Switch rams to other cavity & re test OK. Continue testing BOPE. Meanwhile R/U hard line to reel & changeout injector gripper blocks for 2" CT. 10:00 - 11 :00 1.00 STWHIP P WEXIT P/U injector. M/U packoff. Prep to stab CT. Meanwhile BHI MWD checking out their tools, 11:00-11:15 0,25 STWHIP P WEXIT Held PJSM for stabbing CT. 11 :00 - 13:00 2.00 STWHIP P WEXIT Pull coil from reel across pipe shed roof. Install depth counter & stab CT thru gooseneck & injector. DS tech building a depth encoder connector for tieing BHI MWD depth encoder to the rig depth tracking system..... the one used on the last 2" CT job is missing. 13:00 - 13:45 0.75 STWHIP P WEXIT Cut coil. GBR welder install DS weld-on CTC (ID = 0.996"). Round off weld to ensure no square edges catching on TT. Pull test to 22k ..... OK. 13:45 - 14:45 1,00 STWHIP P WEXIT Press test hardline & inner reel valve to 3500psi ..... OK. Install dart catcher, Load wiper dart. Launch & chase/fill CT with 3% KCL. Dart hit @ 36bbls. Dart stuck @ CTC. 14:45 - 15:45 1.00 STWHIP N MISC WEXIT Cut coil & weld-on another CTC (ID = 1.05"), Pull test to 22k ..... OK. Test CTC to 3500psi ..... OK, Baker confirms that dart for cement job is slightly different from the one pumped. Will have to pump another dart to confirm it can pass thru the 1.05" ID CTC before the cement job. 15:45 - 16:00 0.25 STWHIP P WEXIT Open up well, bleed off WHP & monitor"'" observe Opsi WHP. BHI hook up their MWD transducer to CT hardline. 16:00 - 16:30 0,50 STWHIP P WEXIT Held pre-operations safety meeting. Reviewed well plan, potential hazards & BHA M/U procedure. Emphasize strict adherence to procedures. 16:30 - 18:00 1.50 STWHIP P WEXIT M/U cement milling BHA #1 with 2.74" HC D331 mill, 2-3/8" motor with 1,75deg ABH, GR-DIR MWD, 30 degs orienter, 2 jts of 2-1/16" tbg & MHA (OAL = 113,58'), Scribe tools. 18:00 - 18:30 0,50 STWHIP P WEXIT Crew change & pre tour safety meeting, 18:30 - 22:30 4.00 STWHIP N WAIT WEXIT Wait on BHI to get depth encoder. 22:30 - 23:00 0,50 STWHIP P WEXIT MU injector to BHA. RIH, Flow test MWD. 23:00 - 23:45 0,75 STWHIP N DFAL WEXIT MWD not reading pressure, Trouble shoot MWD. Change pressure transducer. 23:45 - 00:00 0,25 STWHIP P WEXIT Flow test MWD. RIH. 3/18/2003 00:00 - 01 :30 1,50 STWHIP P WEXIT RIH to 8,000'. 01 :30 - 03:00 1.50 STWHIP P WEXIT Calibrate MWD depth, 03:00 - 03:20 0.33 STWHIP P WEXIT RIH. Tag cement top at 10,677'. 03:20 - 05:00 1,67 STWHIP P WEXIT Pull up hole to 10,577', Log down for tie in, Add 10'. 05:00 - 05:30 0,50 STWHIP P WEXIT Orient TF to LS, Retag TOC @ 10687', 05:30 - 05:35 0,08 STWHIP P WEXIT Start LS pilot hole, Mill cement to 10689' with 175R TF, 1,5/1.5bpm, 2760/3040psi, 2k WOB & 24fph ave ROP, 05:35 - 06:25 0.83 STWHIP P WEXIT Orient 2 clicks, Reorient to 180, 06:25 - 06:30 0,08 STWHIP P WEXIT Mill cement to 10691' with 150R TF, 1.5/1.5bpm, 2800/3000psi, 2k WOB & 1 Of ph ave ROP. 06:30 - 06:55 0.42 STWHIP P WEXIT Orient 1 click & mill cement to 10697' with 180 TF, 1,5/1,5bpm, 2800/3000psi, 2k WOB & 14fph ave ROP. TF walking to the Printed: 3/31/2003 11:01 :32 AM ) ') ) ARGO Operations Summary Report Page 2 of 10 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P2-54 P2 -54 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 3/12/2003 Rig Release: 3/27/2003 Rig Number: Spud Date: 4/18/1994 End: 3/28/2003 Date From - To Hours Task Code NPT Phase Description of Operations 3/18/2003 06:30 - 06:55 0.42 STWHIP P WEXIT right. 06:55 - 08: 15 1.33 STWHIP P WEXIT Orient 1 click & mill cement to 10716' with 150L-180 TF, 1.5/1,5bpm, 2800/3000psi, 2k WOB & 14fph ave ROP. 08: 15 - 08:25 0.17 STWHIP N DFAL WEXIT MWD quit pulsing. Resync MWD tool. 08:25 - 09:25 1,00 STWHIP P WEXIT Orient TF to 180. Meanwhile observe GRAX reading maxed out ca 250API - could be due to scale or tool failure. Decide to retie-in to check if tool is still working OK. 09:25 - 09:35 0.17 STWHIP P WEXIT PUH to 10570' & observe GR reading normal. Still decide to retie-in to be absolutely sure of our depths, 09:35 - 11 :00 1.42 STWHIP P WEXIT Log down @ 45fph & tie-into GR marker using SWS 03/07/03 GR/CCL correlation log, Had -1' correction. However GR is ca 20 API hotter. 11:00-11:15 0.25 STWHIP P WEXIT PUH into TT @ 10421' - observe no restrictions. Resync MWD tool & RBIH, 11:15 -12:55 1,67 STWHIP P WEXIT Mill cement to 10750' with 150L-180 TF, 1,5/1.5bpm, 3000/3430psi, 2k WOB & 20fph ave ROP. GR reading normal again. MWD tool pulsing intermittently. Decide to increase rate & see if it can steady-up the tool. Freespin @ 1.8bpm = 3600psi 12:55 -14:15 1,33 STWHIP P WEXIT Mill cement to 10770' with 150L-180 TF, 1.8/1.8bpm, 3600/3800psi, 2k WOB & 15fph ave ROP. Loosing fluid over shakers. Meanwhile audit team carryout ISO 14001 EMS maintenance audit on rig - once again passed with flying colors. 14:15 - 14:30 0.25 STWHIP N DFAL WEXIT MWD quit pulsing. PUH to 10600' to resync MWD tool. Troubleshoot & try several flow rates, check transducer - no luck. 14:30 - 16:30 2.00 STWHIP N DFAL WEXIT POOH for MWD. 16:30 - 18:45 2.25 STWHIP N DFAL WEXIT OOH. SIB injector. Flush BHA. Retrieve MWD probe & observe pulser plugged with green tape & some debris, Function test new MWD probe & reinstall. M/U coil & injector. 18:45 - 21 :00 2.25 STWHIP N DFAL WEXIT RIH w/ BHA #1 RR Spend 20 min SHT. RIH 21 :00 - 21 :55 0,92 STWHIP N DFAL WEXIT Log tie-in down from 10600'-add 10' 21 :55 - 22:10 0,25 STWHIP N DFAL WEXIT RIH and tag TD at 10770' 22:10 - 22:30 0,33 STWHIP N DFAL WEXIT Orient to low side from 150R 22:30 - 23:40 1,17 STWHIP P WEXIT Mill cement low side from 10770' 1,5/3500/180R 20-30'/hr 1-2k WOB 100# diff to 10799' 23:40 - 00:00 0.33 STWHIP P WEXIT PUH to 10680', Orient to high side 3/19/2003 00:00 - 01 :30 1,50 STWHIP P WEXIT Continue to orient to high side-weak orientor and slow BHI detection of signal 01 :30 - 02:00 0,50 STWHIP P WEXIT Mill cement HS 10799-808' 1.5/3500/15L 02:00 - 03:20 1,33 STWHIP P WEXIT POOH for window mill assy 03:20 - 04:05 0,75 STWHIP P WEXIT LD pilot mill and motor. MU window milling assy 04:05 - 06:20 2.25 STWHIP P WEXIT RIH w/ BHA #2 (2.74" WM, 2.5 deg motor) 06:20 - 06:35 0,25 STWHIP P WEXIT Corr +10' at 10600', Chk TF 150L. Orient to 15L. SID pump, 06:35 - 06:40 0,08 STWHIP P WEXIT RIH. Saw slight bobble @ top of pilot hole. Tag csg wall @ 10808', 06:40 - 06:50 0,17 STWHIP P WEXIT P/U 10', Check TF - 60R PUH to 10750', 06:50 - 07:25 0.58 STWHIP P WEXIT Orient TF around to 15L. SID pump. 07:25 - 07:40 0,25 STWHIP P WEXIT RBIH to 10804'. Bring on pumps to 1,7bpm/3550psi. Zero WOB @ 11,2k down wt. TF @ 5L. Tag & see MW @ 10805'. Correct to 10808'. Flag pipe & P/U 1'. TF @ 10L, 07:40 - 12:13 4,55 STWHIP P WEXIT Start time milling window as per time schedule. Mill to 10808' Printed: 3/31/2003 11:01:32 AM ) ) ARGO· Operations Summary Report Page 3 of 10 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P2 -54 P2 -54 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 3/12/2003 Rig Release: 3/27/2003 Rig Number: Spud Date: 4/18/1994 End: 3/28/2003 Date From - To Hours Task Code NPT Phase Description of Operations 3/19/2003 07:40 - 12:13 4.55 STWHIP P WEXIT with 10-5L TF, 1.6/1,6bpm, 3450psi, Ok WOB. 12:13-15:29 3.27 STWHIP P WEXIT Mill to 10808.1' with 5L TF, 1.6/1,6bpm, 3450psi, Ok WOB. Stall 1 x @. P/U to string wt & get out of stall. Continue milling to 10809' with 15L TF, 1.6/1,6bpm, 3450psi, 0-2k WOB. 15:29 -17:12 1.72 STWHIP P WEXIT Mill to 10810' with 15-2L TF, 1,6/1.6bpm, 3750/3920psi, 0-2k WOB. Seeing metal shavings on the shaker. 17:12 -18:25 1.22 STWHIP P WEXIT Mill to 10810,8' with 2L TF, 1.6/1.6bpm, 3750/3920psi, 0-2k WOB. Stall 2x, P/U & get out of stall. Looks like we're out. 18:25 - 20:40 2.25 STWHIP P WEXIT Drill open hole at 8'/hr to 10814.8' and stack 6k 1.4/3200/1 OR. Wiper back thru window and resumed making hole, albeit slow. Drill to 10820'. Window depths (for now) are 10808-811' 20:40 - 22:10 1.50 STWHIP P WEXIT Wiper back thru OH and window, POOH for tapered mill 22:10 - 23:00 0,83 STWHIP P WEXIT LD window milling assy, Mill was 2.73"+ and in real good shape-little center wear. MU 2.72" tapered mill and used 1.75 deg motor 23:00 - 00:00 1.00 STWHIP P WEXIT RIH wI BHA #3 3/20/2003 00:00 - 00:45 0.75 STWHIP P WEXIT Continue RIH wI tapered mill assy 00:45 - 01 :20 0.58 STWHIP P WEXIT Log tie-in down from 10600' 1.7/3690/25L Add 10,0' 01 :20 - 04:45 3.42 STWHIP P WEXIT RIH at min rate and tag at 10820', See flag at 10818,5' (should be at 10808'), muse muse. PUH and chk TF at 1.5/3150/30L. Backream above tag twice wI no motor work. Assume flag is correct depth in relation to window, but did not correct. Start pump and got good stall at 10819,6' @ 30L. Get a click and dress from 10819,6' at 5L with about 8 stalls to 10821'. RIH clean at 0.2'/min to tag at 10827.4' 04:45 - 06: 1 0 1.42 STWHIP P WEXIT Backream at 1.4/2770/15L to 10816', clean. RIH at min rate to TO, get a click. Repeat at 5R, clean, Repeat at 20R, clean. Repeat at 50R, clean, Repeat at 50R (missed the click), clean 06:10 - 08:00 1.83 STWHIP P WEXIT PUH and log down from 10590' 1.4/2750/80R. Tie-into Geology PDC log (SWS CON open hole log of 05/11/94) & subtracted 16' from CTD. Corrected depths are: TOW = 10798', BOW = - 10802' & end of rat hole = 10811'. Paint EOP @ 10540'. Decide to RBIH to confirm TO. 08:00 - 08:40 0.67 STWHIP N MISC WEXIT RBIH & tag TO @ 10811'. 08:40 - 10:00 1,33 STWHIP P WEXIT POOH window dressing BHA, 10:00-11:15 1,25 STWHIP P WEXIT OOH. UD window dressing BHA. Crayola guages 2,72" go I 2.71" no-go. Check MWD probe - OK. 11:15-12:00 0,75 DRILL P PROD1 M/U drilling BHA #4 with 2,69" x 3,0" DPI bicenter bit, 2-3/8" motor with 2.12deg bend, GR-DIR MWD, new 30 degs orienter & MHA (OAL = 50.79'), Scribe tools, 12:00 - 13:20 1.33 DRILL P PROD1 Cut 115' of coil & weld-on a new CTC (10 = 1-1/16"), Pull test & pressure test - OK. 13:20 -14:15 0,92 DRILL P PROD1 Install dart catcher. Load wiper dart (same one for liner cement). Launch & chase with 3% KCL. Dart hit @ 40.4bbls, Retrieve dart easily. 14:15 -16:10 1,92 DRILL P PROD1 RIH drilling BHA#4. Saw flag on depth, RIH to 10600'. 16:10 -17:05 0,92 DRILL P PROD1 Log GR & tie-into Geology PDC log. No correction to CTD. 17:05 - 17:10 0.08 DRILL P PROD1 SID pump, RIH & tag TO @ 10811', 17:10 -17:30 0.33 DRILL P PROD1 Check TF - 105R. Orient TF to 30R. 17:30 - 19:20 1,83 DRILL P PROD1 Start drilling build section, Drill to 10830' with 30R TF, I 1 ,6/1 ,6bpm, 3350/3500psi, 40fph ave ROP, Meanwhile start pumping fresh 9,5ppg, flopro mud downhole. 19:20 - 20:40 1,33 DRILL P PROD1 10850' 1,7/3150/30R Hole displaced wI new mud. Start Printed: 3/31/2003 11:01:32 AM ) ) ARGO Operations Summary Report Page 4 of 10 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P2 -54 P2-54 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 3/12/2003 Rig Release: 3/27/2003 Rig Number: Spud Date: 4/18/1994 End: 3/28/2003 Date From- To Hours Task Code NPT Phase Description of Operations 3/20/2003 19:20 - 20:40 1.33 DRILL P PROD1 having trouble keeping TF on right side (keeps flopping left by 70 deg). Also, GR is 30-200 api higher than expected. Make slow hole with lots of single clicks to 10867' 20:40 - 21 :00 0.33 DRILL P PROD1 Go to window to get a click. Slow ream to TD 21 :00 - 22:15 1.25 DRILL P PROD1 Drill ahead w/lite wt to hold TF 1.6/3200/30R GR appears normal now and assume high DLS in window area may have caused tool malfunction 22:15 - 00:00 1.75 DRILL P PROD1 Drill build ahead of plan from 10907' 1.6/3200/55R and put more into turn. Drill to 10975' and build/turn completed PVT 309 3/21/2003 00:00 - 00:20 0.33 DRILL P PROD1 Wiper to window from 10975', POOH for lateral assy to 9000'. Geo is not comfortable w/ GR and wants to check repeatability 00:20 - 00:35 0,25 DRILL N DFAL PROD1 RIH to relog over tie-in area 00:35 - 01 :00 0.42 DRILL N DFAL PROD1 Log tie-in down from 10570' 1.5/2730/150L and GR did not work. Will pickup backup GR tool that was changed out earlier in well 01 :00 - 01 :15 0.25 DRILL N DFAL PROD1 POOH from 10578' 01 :15 - 02:35 1.33 DRILL P PROD1 POOH from 9000' 02:35 - 03:55 1.33 DRILL P PROD1 Change motor, GR probe 03:55 - 05:50 1,92 DRILL P PROD1 RIH w/ BHA #5 (1.1 deg motor) 05:50 - 06:30 0,67 DRILL P PROD1 WO BHI to boot up. Log down from 10595'. Add 3,0' 06:30 - 06:40 0.17 DRILL P PROD1 RIH thru window & RIH to 10900'. 06:40 - 08:10 1.50 DRILL P PROD1 Log MAD pass up from 10900' to 10810'. GR character came out better than before, RBIH. 08: 10 - 08:20 0,17 DRILL P PROD1 Orient TF to 60R 08:20 - 08:30 0.17 DRILL P PROD1 Drill from 10975' to 10984' with 45R TF, 1,6/1.6bpm, 3075/3400psi, 54fph ave ROP, 08:30 - 09:00 0,50 DRILL P PROD1 Drill from to 11013' with 55R TF, 1.6/1.6bpm, 3075/3400psi, 58fph ave ROP. 09:00 - 09:35 0.58 DRILL P PROD1 Drill to 11063' with 60R TF, 1,6/1.6bpm, 3075/3390psi, 86fph ave ROP. 09:35 - 10:10 0,58 DRILL P PROD1 Drill to 11103' with 60R TF, 1,6/1,6bpm, 3075/3420psi, 75fph ave ROP. 10:10 -10:20 0.17 DRILL P PROD1 Drill to 11126' with 75R TF, 1.6/1.6bpm, 3075/3370psi, 86fph ave ROP, 10:20 - 10:45 0.42 DRILL P PROD1 Wiper trip clean to window, RBIH. 10:45 - 11 :05 0,33 DRILL N DFAL PROD1 MWD lost sync. Resync MWD tool. 11 :05 - 11 :20 0.25 DRILL P PROD1 Orient TF to 60R 11 :20 - 12:15 0,92 DRILL P PROD1 Drill to 11175' with 60R TF, 1.6/1.6bpm, 3075/3450psi, 50fph ave ROP. 12:15 -12:20 0,08 DRILL P PROD1 Orient TF to 90R 12:20 - 12:55 0.58 DRILL P PROD1 Drill to 11227' with 90R TF, 1,6/1.6bpm, 3075/3500psi, 90fph ave ROP. Build up to 106degs inclination. To gradually drop to 65degs. 12:55 - 13:00 0.08 DRILL P PROD1 Orient TF to 120R 13:00 - 13:30 0.50 DRILL P PROD1 Drill to 11275' with 120R TF, 1 ,6/1 ,6bpm, 3075/3500psi, 96fph ave ROP. 13:30 - 14:05 0,58 DRILL P PROD1 Wiper trip clean to window, RBIH, 14:05 - 14:10 0.08 DRILL P PROD1 Drill to 11287' with 130R TF, 1.6/1,6bpm, 3075/3500psi, 95fph ave ROP, 14:10 - 14:25 0,25 DRILL P PROD1 Orient TF to 90R 14:25 - 15:30 1.08 DRILL P PROD1 Drill to 11329' with 90-1 05R TF, 1,6/1,6bpm, 3050/3250psi, 39fph ave ROP, Stack out @ 11329', Printed: 3/31/2003 11 :01 :32 AM ) ) Page 50f 10 ARGO Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date 3/21/2003 3/22/2003 P2-54 P2 -54 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Spud Date: 4/18/1994 End: 3/28/2003 Start: 3/12/2003 Rig Release: 3/27/2003 Rig Number: From - To Hours Task Code NPT Phase Description of Operations 15:30 - 16:50 1.33 DRILL P PROD1 Orient & drill to 11378' with 165R TF, 1.7/1.7bpm, 3100/3500psi, 36fph ave ROP. Bleed down IA. 16:50 - 17:05 0,25 DRILL P PROD1 Orient TF to 60R. 17:05 - 17:15 0.17 DRILL P PROD1 Drill to 11391' with 60R TF, 1.7/1, 7bpm, 3100/3500psi, 86fph ave ROP. 17:15 - 18:00 0.75 DRILL P PROD1 Orient & drill to 11425' with 90-100R TF, 1.7/1.7bpm, 3100/3350psi, 45fph ave ROP. Wt stacking & stalling. 18:00 - 18:20 0.33 DRILL P PROD1 Drill thru hard spot @ 11429'. 18:20 - 18:40 0.33 DRILL P PROD1 Continue drilling to 11450' with 1 05R TF, 1.6/1,6bpm, 3050/3200psi, 80fph ave ROP. 18:40 - 19:20 0.67 DRILL P PROD1 Wiper to window, clean 19:20 - 19:45 0.42 DRILL P PROD1 Orient around to left side 19:45 - 20:20 0,58 DRILL P PROD1 Drill from 11450' 1.6/3100/90L to 11486' and stacking, plus need to break sli build 20:20 - 21 :00 0.67 DRILL P PROD1 Orient around and didn't get clicks. Orient around again 21 :00 - 22:00 1.00 DRILL P PROD1 Drill from 11486' 1.7 /3260/175L to 11535' Drill from 11535' 1,7/3250/11 OL to 11538' and stacking 22:00 - 22:30 0.50 DRILL P PROD1 130' wiper 22:30 - 23:00 0.50 DRILL P PROD1 Drill from 11538' 1.5/2980/90L and stacking. Drill to 11550' 23:00 - 23:25 0.42 DRILL P PROD1 Wiper to window 23:25 - 00:00 0.58 DRILL P PROD1 Log tie-in down from 10600' 1.5/2900/15R. Add 2.0' 00:00 - 00:25 0.42 DRILL P PROD1 Wiper in hole after tie-in, clean. Tag at 11552' 00:25 - 00:50 0.42 DRILL P PROD1 Orient around from SOL 00:50 - 01 :00 0,17 DRILL P PROD1 Drill from 11552' 1.6/3240/1 OOL to 11558' and TF keeps walking up 01 :00 - 01 :30 0,50 DRILL P PROD1 Orient around 01 :30 - 01 :50 0.33 DRILL P PROD1 Drill from 11558' 1.5/31 00/160L to 11568' Swap to new mud Drill from 11568' to 11579' at 130L 01 :50 - 02:20 0,50 DRILL N DFAL PROD1 Work to get a click out of WII orientor and not 02:20 - 02:40 0,33 DRILL N DFAL PROD1 Wiper to window 02:40 - 04:00 1.33 DRILL N DFAL PROD1 POOH for orientor. Fin displ to new mud 04:00 - 05: 15 1.25 DRILL N DFAL PROD1 Change bit, motor, orientor 05:15 - 07:45 2,50 DRILL N DFAL PROD1 RIH w/ BHA #6 (1.1 deg motor). SHT & continue RIH. Tag btm @ 11572' & correct to 11579'. Resync MWD tool. 07:45 - 08:00 0.25 DRILL P PROD1 Orient TF to 135L. Trajectory apex lowered to provide stand-off from the Kalubik/HRZ, 08:00 - 08:40 0,67 DRILL P PROD1 Drill to 11592' with 120L TF, 1,7/1,7bpm, 3500/4100psi, 20fph ave ROP, Stalled & lost TF, 08:40 - 09:05 0.42 DRILL P PROD1 Reorient TF around to 135L. 09:05 - 09:45 0,67 DRILL P PROD1 Drill to 11605' with 135L TF, 1,7/1.7bpm, 3450/3600psi, 20fph ave Rap. 09:45 - 09:55 0,17 DRILL P PROD1 Short 100' wiper, Clean PIUs @ 31 k. 09:55 - 10:20 0.42 DRILL P PROD1 Orient & drill to 11617' with 140L TF, 1.7/1, 7bpm, 3450/3900psi, 70fph ave Rap. 10:20 - 10:30 0.17 DRILL P PROD1 Orient TF to 105L. 10:30 -11:10 0,67 DRILL P PROD1 Drill to 11639' with 105L TF, 1 ,7/1 ,7bpm, 3450/3650psi, 20fph ave Rap, TF walking right. 11: 1 0 - 11 :30 0,33 DRILL P PROD1 Orient TF to 130L. 11 :30 - 11 :35 0,08 DRILL P PROD1 Drill to 11644' & TF walks right again. 11 :35 - 11 :50 0.25 DRILL P PROD1 Reorient TF to 150L. 11 : 50 - 13: 15 1.42 DRILL P PROD1 Drill to 11683' with 105-150L TF, 1,7/1,7bpm, 3350/3650psi, 27fph ave Rap, 13:15 -13:30 0,25 DRILL P PROD1 Orient TF to 135L, Printed: 3/31/2003 11:01 :32 AM ) ') ARGO Operations Summary Report Page 6 of 10 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P2 -54 P2 -54 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 3/12/2003 Rig Release: 3/27/2003 Rig Number: Spud Date: 4/18/1994 End: 3/28/2003 Date From - To Hours Task Code NPT Phase Description of Operations 3/22/2003 13:30 - 13:50 0.33 DRILL P PROD1 Drill to 11698' with 120L TF, 1.7/1.7bpm, 3350/3650psi, 45fph ave ROP. 13:50 - 14:00 0.17 DRILL N SFAL PROD1 SID pump to fix minor leak in pump room. Lost TF. 14:00 - 14:15 0,25 DRILL N SFAL PROD1 Reorient TF to 150L 14:15 - 15:35 1.33 DRILL P PROD1 Drill to 11750' with 150L TF, 1.7/1, 7bpm, 3350/3650psi, 35fph ave ROP. Slow & ratty drilling thru 130+API shale from 11701 '. 15:35 - 16:30 0.92 DRILL P PROD1 Wiper trip to window. Ratty pulling thru shale, RBIH. Set down/stack out in shale @ 11700'. 16:30 - 17:30 1.00 DRILL N DPRB PROD1 Ream shales to 11715'. SID pumps & RIH to 11725'. 17:30 - 17:55 0.42 DRILL N DPRB PROD1 Orient TF to 170L. Clean PIUs @ 31 k. 17:55 - 18:45 0.83 DRILL N DPRB PROD1 Ream shales with -ve wt. Meanwhile geo discusses options with ANC, 18:45 - 19:25 0.67 DRILL N DPRB PROD1 Work back in hole to 11747' wi neg wt and TF moving around the clock. Had 8k overpull on PU, Motor work and 10k overpulls to 11690'. Wiper to window while cuss 'n discuss 19:25 - 19:55 0.50 DRILL N DPRB PROD1 Log tie-in down from 10590' to chk GR. Inconclusive on depth correction, but GR counts are normal. Receive decision to OH sidetrack 19:55 - 21 :20 1.42 DRILL C PROD1 POOH 21 :20 - 21 :45 0.42 DRILL C PROD1 LD lateral assy 21:45 - 22:10 0.42 STKOH C PROD1 MU OH sidetrack assy 22:10 - 23:50 1.67 STKOH C PROD1 RIH wi BHA #7 (2.1 deg motor) 23:50 - 00:00 0,17 STKOH C PROD1 Log down from 10590' 1.4/2750/179R 3123/2003 00:00 - 00:50 0,83 STKOH C PROD1 Continue tie-in from 10590' (and wo DD/geo's to finalize plan) Add 6.0' 00:50 - 01 :30 0.67 STKOH X SFAL PROD1 Orient to HS (when didn't have to-BHI MWD PC malfunction on offset) 01 :30 - 01 :45 0,25 STKOH C PROD1 RIH at 60L and RIH thru window, clean. Precautionary ream to 11175' 1.5/3050/30R 01 :45 - 02:20 0,58 STKOH C PROD1 Orient around to left and locked in at planned 150L 02:20 - 03:45 1.42 STKOH C PROD1 Backream and ream 5'/min 30-40' above sidetrack point at 11175' 1.6/3230/150L (30 deg orientor) 03:45 - 06:00 2.25 STKOH C PROD1 Park at OH sidetrack depth of 11175' for 10 min (flag). Begin time drill 0,1 '/5 min 1,5/3040/150L, Drill to 11177.6' wi occasional PU's due to stacking 06:00 - 07:35 1.58 STKOH C PROD1 Continue time drilling to 11179' with 150L TF, 1,5/1,5bpm, 3000psi, Ok WOB & 0,1 '/5min. Stacking wt. P/U to 11175' & RBIH & see slight MW @ 11175', 07:35 - 10:45 3.17 STKOH C PROD1 Time drill from 11175' to 11177,9' with 150L TF, 1.5/1,5bpm, 3000/3070psi, Ok WOB & 0,1 '/5min, Stacking wt, Decide to trough again 15' above sidetrack pt. 10:45 - 12:35 1,83 STKOH C PROD1 Backream & ream 3x @ 1 fpm from 11175' to 11160', 12:35 - 13:50 1,25 STKOH C PROD1 Time drill from 11175' to 11176,6" with 150L TF, 1,5/1,5bpm, 3000psi, Ok WOB & O,1'/5min, 13:50 -14:50 1.00 STKOH C PROD1 Push on it to see if we can get a bite. Stacked out. P/U & RBIH, Seeing motor work from 11177', Pump 25bbls of 5% lubetex pill. Drill sidetrack to 11186' with O.2fpm. 150L TF, 1,5/1,5bpm, 3000/3050psi & Ok WOB, 14:50 - 15:00 0.17 STKOH C PROD1 Continue drilling with 150L TF. 1,5/ 1,5bpm & 3000/3050psi & 18fph ave ROP, Stall @ 11188', 15:00 - 15:05 0,08 STKOH C PROD1 Drill to 11191' with 150L TF, 1,71 1. 7bpm & 3450/3600psi & 30fph ave ROP, 15:05 - 15:25 0,33 STKOH C PROD1 Drill to 11200' with 150L TF, 1,71 1, 7bpm & 3450/3650psi & I Printed: 3/31/2003 11 :01 : 32 AM ) ') Operations. Summary. Rep.ort Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P2-54 P2 -54 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 3/12/2003 Rig Release: 3/27/2003 Rig Number: Spud Date: 4/18/1994 End: 3/28/2003 Date From - To Hours Task Code NPT Phase Description of Operations 3/23/2003 15:05 - 15:25 0,33 STKOH C PROD1 40fph ave ROP. Survey @ 11177' shows AZM of 175deg & INC of 103deg. Interpolated survey @ same depth in original hole shows AZM of 177deg & INC of 105deg. SIT pt is 11175'. 15:25 - 15:55 0.50 STKOH C PROD1 Orient TF to HS. 15:55 - 16:20 0.42 STKOH C PROD1 Drill to 11215' with 10L TF, 1.7/1.7bpm & 3550/380psi & 65fph ave ROP. Survey @ 11192' shows AZM of 171deg & INC of 99deg. Interpolated survey @ same depth in original hole shows AZM of 179deg & INC of 106deg. 16:20 - 16:30 0.17 STKOH C PROD1 Backream from 11215' to 11160' @ HS TF, 1,5bpm, 3150psi & 140fph. 16:30 - 16:40 0.17 STKOH C PROD1 Orient TF to 150L. 16:40 - 17:20 0,67 STKOH C PROD1 Ream from 11160' @ 150L TF, 1,7bpm, 3350psi & 850fph. No bobbles @ SIT pt. Tag up @ 11215'. Backream & ream 3x from 11215' to 11160' @ 150L TF to extend trough. 17:20 - 19:00 1.67 STKOH C PROD1 POOH sidetrack BHA#7. 19:00 - 20:10 1,17 STKOH C PROD1 LD sidetracking assy. MU drilling assy, Change bit, motor, MWD probe 20:10 - 20:55 0.75 STKOH X SFAL PROD1 Replace manual CT footage counter 20:55 - 22:45 1,83 STKOH C PROD1 RIH w/ BHA #8 (1.4 deg motor) 22:45 - 23:30 0.75 STKOH C PROD1 Log tie-in down from 10600' 1.4/2850/20L No correction 23:30 - 23:50 0.33 STKOH C PROD1 RIH thru window, clean to 11175' 23:50 - 00:00 0.17 STKOH C PROD1 Precautionary ream 11175- TD at 2'/min 1.5/3020/1 OOL 3/24/2003 00:00 - 00:15 0,25 STKOH C PROD1 Fin precautionary ream 2'/min to tag at 11217.4' at 100L 00: 15 - 00:35 0.33 STKOH C PROD1 Orient to right side 00:35 - 00:50 0.25 STKOH C PROD1 Ream 11200-217' at 60R TF at 1'/min 00:50 - 01:15 0.42 STKOH C PROD1 Drill from 11217' 1.5/3040/75R to 11235' 01: 15 - 01:45 0.50 STKOH C PROD1 Drill from 11235' 1.5/3050/90-1 OOR to 11256' 01:45 - 01 :55 0.17 STKOH C PROD1 Orient to low side after seeing 104 deg incl 01 :55 - 02:50 0.92 STKOH C PROD1 Drill from 112561,5/3080/150-170R to 11298' and stacking due to TF chg 02:50 - 03:00 0.17 STKOH C PROD1 100' wiper 03:00 - 04:00 1,00 STKOH C PROD1 Drill from 11298' 1,5/31 00/170R-160L to 11360' 04:00 - 04:25 0.42 STKOH C PROD1 Pump up survey 04:25 - 05:00 0,58 STKOH C PROD1 Wiper to window 1.4/2870/160L 05:00 - 05:25 0.42 STKOH C PROD1 Orient around 05:25 - 05:50 0.42 STKOH C PROD1 Drill from 11360' 1,5/31 00/165R to 11397' 05:50 - 06:20 0,50 STKOH C PROD1 Orient around. Looks like we will TD on the east edge of polygon, but okayed w/ geo's 06:20 - 06:40 0.33 STKOH C PROD1 Drill from 11397' 1.6/3140/130R/85fph to 11431'. 06:40 - 07:20 0,67 STKOH C PROD1 Drill to 11468' with 135R TF, 1.4/1.4bpm, 3050/3480psi, 3k WOB & 56fph ave ROP. 07:20 - 07:45 0.42 STKOH C PROD1 Drill to 11497' with 165R TF, 1.4/1.4bpm, 3050/3480psi, 3k WOB & 76fph ave ROP, 07:45 - 07:55 0.17 STKOH C PROD1 Drill to 11510' with 165R TF, 1.4/1.4bpm, 3050/3480psi, 3k WOB & 60fph ave ROP, 07:55 - 08:40 0.75 STKOH C PROD1 Wiper clean to window @ 1.4bpm/3050psi. RBIH, 08:40 - 08:55 0,25 STKOH C PROD1 Drill to 11537' with 180 TF, 1.7/1.7bpm, 3500/3880psi, 3k WOB & 90fph ave ROP, 08:55 - 09:30 0,58 STKOH C PROD1 Drill to 11575'with 180TF, 1.7/1.7bpm, 3500/3880psi, 3k WOB, 71 fph ave ROP & 2 stalls, 09:30 - 09:45 0.25 STKOH C PROD1 Drill to 11603' with 180 TF, 1.7/1,7bpm, 3500/3880psi, 3k WOB & 88fph ave ROP. TF walking to the left. 09:45 - 10:10 0,42 STKOH C PROD1 Orient TF to 160R. Printed: 3/31/2003 11:01:32AM ) ) Operations Sum maryReport Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P2-54 P2-54 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 3/12/2003 Rig Release: 3/27/2003 Rig Number: Spud Date: 4/18/1994 End: 3/28/2003 Date From - To Hours Task Code NPT Phase Description of Operations 3/24/2003 10:10 - 10:45 0,58 STKOH C PROD1 Drill to 11629' with 150R TF, 1.7/1.7bpm, 3500/3720psi, 43fph ave ROP & 2 stalls. 10:45 - 11: 15 0.50 STKOH C PROD1 200' wiper trip. 11: 15 - 13: 10 1,92 STKOH C PROD1 Drill to 11653' with 160R TF, 1.7/1.7bpm, 3500/3750psi & 15fph ave ROP. Wt stacking, Pump 30bbls 5% Lubetex pill. Drill thru hard spot @ 11653'. 13:10 - 14:50 1.67 STKOH C PROD1 Drill to TD @ 11692' with 150R TF, 1.7/1. 7bpm, 3500/3850psi & 23fph ave ROP. Geo interprets log. Seems like we crossed 2 ? faults @ 10560' & 10623'. Top LA/Lower LB1 is likely @ 10602'. Top Miluveach is likely @ 10623'. 14:50 - 15:40 0.83 DRILL P PROD1 Wiper trip to window. Continue wiping to 10590'. 15:40 - 16:30 0.83 DRILL P PROD1 Log GR & tie-into Geology PDC log, Subtract 2' from CTD. 16:30 - 16:55 0.42 DRILL P PROD1 RBIH. Set down @ 11623'. 16:55 - 17:10 0,25 DRILL P PROD1 Ream shales down to 11627'. P/U & O/pulled, Shale is sticky & nasty. Decide not to ream shales, Will set an OH AI whipstock or OH bridge plug or run a flutted no-go sub below deploy sleeve to provide solid btm for liner. 17:10 - 18:00 0,83 DRILL P PROD1 Backream & ream OH while pumping down 20bbls of 9.7ppg fresh flopro mud with 50k LSRV, 4% Lubtex & 6# Klagard, Hole is clean till 11623' . 18:00 - 19:50 1.83 DRILL P PROD1 Paint EOP flag @ 11500', POOH drilling BHA laying-in the fresh mud in the OH. 19:50 - 20:30 0,67 DRILL P PROD1 LD drilling BHA 20:30 - 21 :00 0,50 DRILL P PROD1 FP exposed CT w/1 bbls FW and 1 + bbl MeOH (so mud charge pump can be removed) 21 :00 - 21 :30 0.50 BOPSUR P PROD1 RU to perform weekly BOPE test Safety mtg re: simops (will install new mud pump while test BOPE) 21 :30 - 00:00 2.50 BOPSURP PROD1 BOPE test. AOGCC waived witness 3/25/2003 00:00 - 04:00 4.00 BOPSURP PROD1 Fin weekly BOPE test. Circ MeOH out of CT. PT inner reel valve 04:00 - 05:20 1,33 EVAL P PROD1 Load PDS memory resistivity tools in pipeshed Safety mtg re: RU tools MU Logging BHAlRU encoder 05:20 - 08:00 2.67 EVAL P PROD1 RIH w/ BHA #9 thru window into OH. Start pumping 20bbls of 3% KCL with 2ppb biozan downhole @ 1.6bpm/2800psi. RIH & correct -2' @ the flag. Set down from 11624' Slick down to 11630'. 08:00 - 08:10 0,17 EVAL P PROD1 Pump down 3% KCL with 2ppb biozan, Chase KCL fluid with 20bbls of 9.7ppg fresh flopro mud with 50k LSRV, 4% Lubtex & 6# Klagard & follow with used flopro. 08:10 - 08:45 0,58 EVAL P PROD1 Displace out the 140k ppm CL mud from the OH to 10200' & log up from 11630' to 10200' @ 40fpm & O,6bpm/1680psi. 08:45 - 09:25 0,67 EVAL P PROD1 Log down from 10200' to 11630' @ 40fpm, 09:25 - 11 :30 2,08 EVAL P PROD1 Displace out the 3% KCL water from the OH to 10200' with fresh flopro mud & POOH @ 40fpm & 1 bpm/1700psi. Paint EOP flag @ 11501', 10400' & 9600', 11 :30 - 12:00 0,50 EVAL P PROD1 UD PDS Memory resistivity tools, 12:00 - 12:30 0.50 EVAL P PROD1 W.O. Weatherford aluminum OH whipstock, Meanwhile download memoery resistivity log, 12:30 - 13:30 1,00 CASE P PROD1 Load Weatherford tools in pipeshed, Held PJSM & M/U Weatherford 2-1/2" aluminum OH whipstock tools, 13:30 -16:15 2,75 CASE P PROD1 RIH with WI! AL OH W/S BHA #10. Depth correct to EOP flag Printed: 3/31/2003 11:01:32 AM ) ') ARGO Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P2-54 P2-54 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 3/12/2003 Rig Release: 3/27/2003 Rig Number: Spud Date: 4/18/1994 End: 3/28/2003 Date From - To Hours Task Code NPT Phase Description of Operations 3/25/2003 13:30 -16:15 2.75 CASE P PROD1 at 9600', -2'. RIH to flag at 11501' EOP, -1'. Position bottom of anchor at 11620'md. Top of anchor at 11606'md. 16:15 - 17:15 1.00 CASE P PROD1 Drop ball. Ball on seat at 32bbls. Shear out at 5000psi. Stack down 60001bs. 17:15 - 19:05 1.83 CASE P PROD1 POH with BHA #10 19:05 - 19:45 0.67 CASE P COMP Tag up with BHA #10. Lay down WF eq. No flow test on well. 19:45 - 20:15 0,50 CASE P COMP Safety meeting prior to picking up liner. 20: 15 - 23:00 2,75 CASE P COMP Make up liner as per MOJ email of 3/25/2003. 23:00 - 00:00 1.00 CASE P COMP RIH with 2-3/8" liner. 3/26/2003 00:00 - 01 :10 1.17 CASE P COMP Continue RIH with 2-3/8" liner. Make +7' correction at flag. 01: 10 - 01 :50 0.67 CASE P COMP Tag bottom at 11606'. Drop 5/8" ball. Release from liner. 01 :50 - 04:00 2.17 CASE P COMP Circ well to KWF brine. 04:00 - 04:20 0.33 CEMT P COMP Safety meeting prior to pumping cement. 04:20 - 04:50 0,50 CEMT P COMP Circ while cement comes up to weight. 04:50 - 05:05 0.25 CEMT P COMP Pump 14 bbls cement. 05:05 - 05:20 0.25 CEMT P COMP Drop dart. Confirmed good launch. 05:20 - 06:00 0.67 CEMT P COMP CIP@05:45, Good cement job. No losses. Bumped plug on volume, Floats held. 06:00 - 07:20 1,33 CEMT P COMP Un sting, POH laying in bio to replace void age. 07:20 - 07:45 0.42 CEMT P COMP Stand back injector, LD liner running tools, 07:45 - 08:30 0.75 CLEAN N WAIT COMP Wait on Baker 2-1/8" straight motor from Deadhorse. 08:30 - 08:45 0.25 CLEAN P COMP PU used D331 pilot mill (2.74Go/2.73NoGo), 2-1/8" Baker thru-tubing Motor, Circ sub, Hyd Disc., DBPV, Weld on CTC. 08:45 - 10:40 1,92 CLEAN P COMP RIH at min rate with Cleanout assembly 10:40 - 12:00 1.33 CLEAN P COMP Bring pumps up to 1.5bpm at 9350' continue to liner top at 10468'md. May see stringers as high as 9400'. Freespin=1950. Lightly tag liner top. PU, circulate around 15bbls, 2ppb bio. Bottoms up seeing contaminated cement returns, send 37bbls to the cuttings tank. Make two complete passes from liner top to 9400. 12:00 - 13:10 1,17 CLEAN P COMP POH. PJSM with crew while POH on LD motor and mill. 13:10 - 13:30 0.33 CLEAN P COMP LD BHA#11. 13:30 - 13:45 0,25 CLEAN P COMP PJSM prior to picking up CS Hydril. 13:45 - 15:00 1,25 CLEAN P COMP PU BHA #12: HC D331 1.875", Navidrill Motor, Circ Sub, Disconect, XO, 38jts 1" CS Hydril, XO, Disconnect, Checks, Weld on CTC, 15:00 - 16:30 1,50 CLEAN P COMP RIH with BHA #12 16:30 - 17:45 1,25 CLEAN P COMP Continue RIH 23fpm, increase pump rate to 1.2bpm at 9350'md. Circulate around 15bbls 2ppb bio. No significant motor work RIH. Tag TD at 11600'md. PU at 1.1 bpm, 60fpm, circulating well back to 3% KCI. No motor work thru liner. 17:45 - 19:00 1,25 CLEAN P COMP POH Chasing bio to surface. 19:00 - 19:35 0,58 CLEAN P COMP Tag up at surface with CSH. Safety meeting prior to tripping pipe, 19:35 - 21 :00 1.42 CLEAN P COMP Stand back 1" CSH workstring, 21 :00 - 21 :20 0,33 EVAL P COMP Safety meeting prior to PU MCNL and running CSH back in hole, 21 :20 - 23:00 1,67 EVAL P COMP PU/RIH SWS MCNL on 1" CSH, 23:00 - 23:10 0.17 EVAL P COMP Make up injector. 23: 10 - 00:00 0,83 EVAL P COMP RIH with logging BHA. 3/27/2003 00:00 - 00:45 0,75 EVAL P COMP Continue RIH with logging tools on coil. 00:45 - 01 :30 0.75 EVAL P COMP Log MCNL down from 10350'-11600',30 fpm. 01 :30 - 01 :50 0,33 EVAL P COMP Log up at 60 fpm, Printed: 3/31/2003 11:01:32 AM ) ) ARGO Operations Summary Report Page 10 of 10 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: P2 -54 P2 -54 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 3/12/2003 Rig Release: 3/27/2003 Rig Number: Spud Date: 4/18/1994 End: 3/28/2003 3/27/2003 01 :50 - 03:10 1.33 EVAL P COMP POOH 03:10 - 04:00 0,83 EVAL P COMP Stand back injector, trip CSH OOH. 04:00 - 04:15 0,25 EVAL P COMP Safety meeting prior to laying down CNL tool. 04: 15 - 04:45 0,50 EVAL P COMP Lay down MCNL tool. 04:45 - 05: 15 0.50 CASE P COMP Pressure test liner lap. 2200 psi for 30 minutes. Lost 104 psi over 30 minutes. Good test of liner lap, 05: 15 - 05:45 0.50 PERF P COMP Safety meeting prior to picking up perf guns. 05:45 - 07: 15 1.50 PERF P COMP Pick up perf guns and 30 Jts of CS Hydril 07: 15 - 07:35 0,33 PERF N COMP Phone call from town PE: drop top 4 guns. Standback injector, unstab CT. 07:35 - 07:50 0.25 PERF N COMP PJSM on standing back CS Hydril and LD loaded guns. 07:50 - 08:45 0.92 PERF N COMP Stand back 15 stands of CS Hydril, LD guns #15,14,13 and 12, 08:45 - 09:40 0,92 PERF N COMP MU Firing head to guns, PU 19 stands of CS Hydril. 09:40 - 11 :40 2,00 PERF P COMP RIH with perf guns. Slow down to 50fpm once inside liner. 11:40-12:30 0,83 PERF P COMP Lightly tag PBTD, correct depth -6' to 11 ,599'md (PBTD corrected to 3/27/03 MCNL). PU to 11584', 3.3' below firing depth. Launch 1/2" aluminum ball with 5bbl high vis pill ahead and 6bbl high vis pill behind. 1.6bpm, 3800psi. At 33bbls drop rate to 0.8bpm, 985psi (CT + Hydril vol= 43bbls), Ball on seat, start creeping OOH, shear ball seat out at 11580,7' on a drive by. Continue POH. Fill hole across backside. PERFORATIONS: 1.56", HSD, 4spf, PowerJet Charges. 11335-11420', 11460-11490', 11550-11580', 145' total Perfs over 3 intervals. 12:30 - 13:50 1.33 PERF P COMP POH with spent perf guns, filling across backside. 13:50 - 14:00 0.17 PERF P COMP Stand back injector, circulate CT. 14:00 - 14:15 0,25 PERF P COMP PJSM discuss LD CS Hydril. 14:15 -16:00 1,75 PERF P COMP LD 38 singles CS Hydril 16:00 - 16:15 0.25 PERF P COMP PJSM prior to LD spent guns. Discuss trapped pressure. 16:15 - 17:15 1.00 PERF P COMP LD spent guns, one blank had trapped pressue, Mud bucket on tongs worked well. 17:15 - 17:35 0,33 CASE P COMP PU nozzle and stinger for freeze protect. 17:35 - 18:30 0,92 CASE P COMP RIH to freeze protect well. Freeze protect to 2500' with 60/40 Methanol. 18:30 - 18:55 0.42 RIGD P POST Safety meeting prior to purging coil tubing with N2. 18:55 - 20:00 1,08 RIGD P POST Blow down coil with N2, 20:00 - 22: 15 2,25 RIGD P POST Continue with rig down. Unstab coil. Clean pits, etc, 22: 15 - 00:00 1,75 RIGD P POST Nipple down stack, NU tree cap, PT to 3500 psi, ok, Tree cap PT'd at 23:50, RIG RELEASE AT MIDNIGHT 3-27-2003, 3/28/2003 00:00 - 00:30 0,50 RIGD POST Continue prepping rig for move off of well PM2-54, 00:30 - 01 :00 0,50 RIGD POST Safety meeting prior to moving off of well. 01 :00 - 02:00 1,00 DEMOB POST Move rig off of well. Position at entrance to pad. 02:00 - 03:00 1,00 DEMOB POST Safety meeting with security, CPS, rig hands, BP Co, Rep prior to moving onto access road for move to E-01 on the WOA. Start rig move to E-01 at 03:00 Printed: 3/31/2003 11 :01 :32 AM ) ) ... ØAKD. HUGHI. ..,........,.~,..........~............_"....."......,.... INTEQ bp BP Baker Hughes INTEQ Survey Report Company: Fie.ld: Site; wêïl: ·Wellpath: BPAmoco Point Mac Pt Mac2 P2;.54· P2;.54A Date.: 4/21/2003 Time: 17:40:57 Page: Co,..ordioªte(NE) Reference: Well: P2,..54, True North "ër~icål(tV'))) Rëfèrenëe: 73:·544118/199400:0045.6 Sèction(VS)Reference: Well (O;OON ,0.00E,183.00Azi) SUrvey CalcubdionMethod: · . Minimum Curvature· . ·Db: Oräcle Field: Point Mac North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre BGGM2002 Site: pt Mac 2 TR-12-14 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft 5995140.76 ft 674873.98 ft Latitude: Longitude: North Reference: Grid Convergence: 70 23 32.530 N 148 34 37.934 W True 1.34 deg Well: P2-54 Slot Name: P2-54 Well Position: +N/-S 2735.73 ft Northing: 5998031.70 ft Latitude: +E/-W 6675.14 ft Easting: 681482.87 ft Longitude: Position Uncertainty: 0.00 ft 54 70 23 59.406 N 148 31 22.383 W +N/-S ft 0.00 Drilled From: Tie-on Depth: Above System Datum: Declination: Mag Dip Angle: +E/-W ft 0.00 P2-54APB1 11175.00 ft Mean Sea Level 26.02 deg 80.90 deg Direction deg 183.00 Wellpath: P2-54A 500292247001 Current Datum: 73 : 54 4/18/1994 00:00 Magnetic Data: 3/24/2003 Field Strength: 57553 nT Vertical Section: Depth From (TVD) ft 0.00 Height 45.62 ft Survey Program for Definitive Wellpath Date: 4/21/2003 Validated: Yes ActualFrom To Survey ft ft 11175.00 11692.00 MWD Version: 5 Toolcode Tool Name MWD MWD - Standard Annotation MD TVD ft ft 11175.00 8870.12 KOP 11692,00 8977.74 TD Survey: MWD Start Date: 3/24/2003 Company: Baker Hughes INTEQ Engineer: Tool: MWD,MWD - Standard Tied-to: From: Definitive Path Survey MD Incl Azim TVD SSTVD N/S E/W MapN MapE VS DLS ft deg deg ft ft ft ft ft ft ft d eg/1 000 11175.00 105.32 177.01 8870.12 8824.50 -3563.36 4662.12 5994582.83 686229.86 3314.48 0.00 11204.03 98.44 171.58 8864.15 8818.53 -3591.60 4664.96 5994554.67 686233,38 3342,53 29.95 11233.13 104.77 173.69 8858,29 8812.67 -3619.85 4668.62 5994526.51 686237.72 3370,55 22,88 11265.18 104,68 178.76 8850.14 8804.52 -3650.77 4670.66 5994495,65 686240.51 3401,32 15.30 11304.61 98,00 183.53 8842.39 8796,77 -3689.39 4669.87 5994457.03 686240.66 3439,93 20.68 11335.76 92,29 183,53 8839.60 8793.98 -3720.34 4667.96 5994426,04 686239.50 3470.94 18,33 11371.71 87.01 182.48 8839.82 8794.20 -3756.23 4666.07 5994390.12 686238.49 3506.88 14,97 11403.58 81,74 184,58 8842.94 8797.32 -3787.87 4664,12 5994358.44 686237.31 3538.58 17,79 11437.94 78.84 190.21 8848,74 8803,12 -3821.44 4659,77 5994324,78 686233.78 3572,33 18.22 11471.06 74.71 194.78 8856,32 8810.70 -3852.90 4652,81 5994293,16 686227,58 3604,12 18,33 11505.34 69,17 198,30 8866,95 8821,33 -3884,13 4643,55 5994261.72 686219,09 3635.79 18.88 11539.61 63.11 199,00 8880,80 8835,18 -3913.82 4633,54 5994231.80 686209,80 3665,95 17.78 11574,19 56.51 197,59 8898,18 8852,56 -3942.17 4624,15 5994203,22 686201.10 3694,76 19.41 bp Company: BP Amoco Field: Point Mac Site: PtMac 2 Wëll: P2·54 Wellpath: P2~54A Survey MD ft 11604.96 11633.46 11666.19 11692.00 ') ) it. IWGHIS .'.................................., INTßQ BP Baker Hughes INTEQ Survey Report Incl deg 51.33 47.37 41.13 41.13 Ázim dag 196.19 199.35 203.57 203.57 Date: 4/21/2003 Time:. 17:40:57 Page: 2 Co:-ordimite(NË) Reference: Well: P2-54, True North Verticål(TYD) Referellce: 73: 54 4/18/1994 00:00 45.6 Section (VS) Rëference: Well (0.00N¡Q;00E,183.00Azi) SurveyCalculatiö.n Mëthod: Minimum Curvature Db: Oracle TVD SSTVD N/S EIW MapN MapE VS DLS ft ft. ft ft ft ft ft deg/100ft 8916.30 8870.68 -3965.96 4616.92 5994179.27 686194.45 3718.89 17.23 8934,86 8889.24 -3986.55 4610.34 5994158.53 686188.37 3739.80 16.24 8958.30 8912.68 -4007.80 4602.04 5994137.09 686180.59 3761.45 21.07 8977.74 8932.12 -4023.36 4595.25 5994121.37 686174.18 3777.35 0.00 BP Amoco WELLPATH DETAILS Parent Wellpath: Tie on MD: P2-54A 500292247001 P2·54APB1 11175.00 Rig: Ref. Datum: Nordic 1 73: 54 4118/1994 00:00 45,62ft V.Sectlon Origin Origin Angle +N/·S +EJ-W 183.00· 0.00 0.00 Starting From TVD 0,00 REFERENCE INFORMATION Co-ordinate (N/E~ Reference: Well Centre: P2-54, True North Vertical (NO Reference: System: Mean Sea Level Section (VS Reference: Slot - 54 (O.OON,O,OOE) Measured Depth Reference: 73: 54 4/18/1994 00:00 45,62 Calculation Method: Minimum Curvature ANNOTATIONS TVO MO Annotation .E/.w StJa,pe ~mf~12 ~~ jmi~ H!!-~ ~~ 8824,50 11175,00 KOP 8932,12 11692_00 TO bp LEGEND P2-54.P2-54A,Plan'iJ3A P2-54 (P2-54) P2-54 (P2-54APB1) P2-54A T AM A é Baker Hughes :~~i~liff~~~1~q,oom Wellpalh: (P2-541P2-54A) Azimuths to True North Magnetic North: 26,02· Magnetic Field Strength: 57553nT Dip Angle: 80,90· Date: 3/24/2003 Model: BGGM2002 :f \.. ~-- ;)\,-~ ~',-,;~:,¿./"/ Created By: Brij Polnis Date: 4/21/2003 ~ ;.. Cnniact ir:fon-natior:. INTEQ - - '~ · - , - . ~'.~~ · · · · . · · -oJoJoJoJ · . · ~~ · · " · . · . ,~ · , · - , . · -oJoJoJoJ "."'",,, '" .' ",'",,- " "."" _mm - -- m"',,,' ','" _' '. ,""" "','" .' '-," '. " · , · \" "-4 . ". · -3400--:: , \ I (P2-54) · - . ',', · · ." . - · . .~~ , · -..'-<oJoJ , · , · \ , · · , · . · , · · · , -3500 " · · · . ,'" ., . , · ""'.",'m, '",m ,'m- ',_ ',n'm """_ "-,,,-,. ", ,-, , ...~""'-- · · " ~ · " " Nl. , -oJoJoJV , . , '" ." '" - -, n_ "". \ ,-- -- · · ","', : -3600---:: · , ." · . " '. " . · ""., " ,,'.' """ "',"- ,',' -, ",',' m " ,m '"m ,., '-', .' · ,'.'"" ....""'''...-- ......-,oo;J\J , t- " .... ~~^^ . .~-"'vv "" """ , .', 'mm f . ,_"""m'" ,," , · : -3750'~ · , '" - ., '" . . "," ",' j '1 ! ",' · , ", : " ::, : I . , · """ .,"'.' · :-3800-:: , . / " ". '. ,,', ".",.',-" , :_",." '. · ",- "'" 'm'"", , ·,""'.'m "" , ,,", ' --, , , : : · '.' ~~~^ - '- " ",'.' "m", " < "." ,0: / "" "" r! , " -- . ,','- · ,." ,,', , ",' ," -"0"" · .. · , ." , , ", · ".' ., m " , - · t , f- , / · · , , I . · · -- -3950~ · '," "'" , "'j' " ."l ,,',', " 'm ,., - ' , "'" '" ". " , ~' ',. -, . , . · . · , " · I-~ ,n, , - -4000--~ · , I L ~ · ' -- ". . - , I~ ,~ r .no· [~ · . · · · , · · , · . -4050--= " , "'0'" ,'," ,- : ,. ,'" ,',',',', .,' ".' " .. """" · , , . · · .' " · · , -+ 'vv · . · · ." · " · . , ' . · , , · · -. ''''' -'-' 40;0 .. , . ' . , · ' -- ~~¿¿ ~'i¿¿ , . ! ~O¿ . i 4'9'd¿ ~~5'~ '5'oid~ ';J5¿ .' '5'1'5'~ ';dd~ J. ' '5~'dc; 4~ 00 4~ 50 43 [)() 43 50 4<1 )0 4<1 50 4550 4650 8350 8400 8450 8500 - C .- 8550 ~ 8600 - ;8650 a. ~8700 ~8750 ¡8800 > G)8850 ~8900 8950 9000 9050 9100 -- :""":" .' ; Vertical Section at 183.00° [50ft/in] 1J/21/2003 5:1J2 PM .~ -- ) ) .ii. s bp BP Baker Hughes INTEQ Survey Report .....................~....,.........,...."............_...... Company: Field: . . Site: Well:. Wêllpatb: BP Amoco Point Mac Pt Mac2 P2..54 P2~54APB1 Field: Point Mac North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Site: Pt Mac 2 TR-12-14 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0,00 ft Ground Level: 0.00 ft 5995140.76 ft 674873.98 ft [NTEQ Date: . .4/21/2003 Time: 17:39:33 Page: Co-ordinate(NE) Reference: vvell: P2-54, JrueNorth . Verticål('rVD) RëCerel1ce: .. 13: 54 4/t8/1994 00:00 45.{) Sectio~(VS) l~eferel1ëê: Well (0.bON,0.00E,132.55AZi) SUrvey CalculàtionMetbod: MinimumCürvature·· . Db: Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre BGGM2002 Latitude: Longitude: North Reference: Grid Convergence: 70 23 32.530 N 148 34 37.934 W True 1.34 deg Well: P2-54 Slot Name: P2-54 Well Position: +N/-S 2735.73 ft Northing: 5998031.70 ft Latitude: +E/-W 6675.14 ft Easting: 681482.87 ft Longitude: Position Uncertainty: 0.00 ft Height 45.62 ft Wellpath: P2-54APB1 500292247070 Current Datum: 73 : 544/18/1994 00:00 Magnetic Data: 3/24/2003 Field Strength: 57553 nT Vertical Section: Depth From (TVD) ft 0.00 Survey Program for Definitive Wellpath Date: 3/24/2003 Validated: Yes Actual From To Survey ft ft 100.00 10798.00 1 : Schlumberger GCT multishot 10798.00 11750.00 MWD Annotation MD TVD ft ft 10798.00 8829,58 KOP 11750.00 8848.84 TD Survey: MWD Company: Baker Hughes INTEQ Tool: MWD,MWD - Standard Survey MD Incl Azim TVD SSTVD ft deg deg ft ft 10798.00 35,98 130.87 8829.58 8783.96 10839.26 55,20 140,99 8858.35 8812.73 10872,66 64,00 135.00 8875,25 8829.63 10923,86 79,00 139.20 8891.46 8845.84 10957.83 86.40 143,80 8895,77 8850.15 10988,53 91,05 149.43 8896.45 8850.83 11033.90 94.57 155.40 8894.23 8848.61 11072.08 97,65 160,68 8890.16 8844.54 11109.51 99,93 167,71 8884.44 8838.82 11141.68 102,57 172,28 8878,16 8832.54 11181.16 105.82 177.90 8868.47 8822.85 11215,13 106,44 183,53 8859,03 8813.41 +N/-S ft 0.00 54 70 23 59.406 N 148 31 22.383 W Drilled From: Tie-on Depth: Above System Datum: Declination: Mag Dip Angle: +E/-W ft 0.00 P2-54 10798,00 ft Mean Sea Level 26.02 deg 80.90 deg Direction deg 132.55 Version: Toolcode Tool Name GCT -MS MWD Schlumberger GCT multishot MWD - Standard Start Date: 3/22/2003 Engineer: Tied-to: From: Definitive Path N/S E/W MapN MapE VS DLS ft ft ft ft ft deg/100ft -3259.11 4498,32 5994882.99 686058.72 5517.77 0,00 -3280.43 4518,36 5994862.17 686079.27 5546.95 49.66 -3301,75 4537.65 5994841,32 686099.08 5575.59 30.54 -3337,26 4570.55 5994806,62 686132.82 5623,83 30.30 -3363,62 4591.49 5994780.78 686154.40 5657,08 25.59 -3389.23 4608.37 5994755.59 686171,90 5686,83 23.78 -3429.36 4629.34 5994715.98 686193.84 5729.43 15.26 -3464.55 4643,54 5994681.15 686208,88 5763,68 15,94 -3500.12 4653,61 5994645.84 686219.81 5795,15 19.53 -3531 .18 4659,10 5994614.92 686226,05 5820.20 16.17 -3569,29 4662,38 5994576.91 686230.26 5848.39 16.07 -3601.90 4661,98 5994544.29 686230.65 5870,15 16.02 bp ) ) II". a S BP Baker Hughes INTEQ Survey Report ....,....~.............'.....M.'......~M...".........._.._. [NTEQ C()mpany: . BPAmoco F~eld: Point Mac Site: pt Mác 2 Well: P2-54 Well path : P2'-54APBl Survey MD InCl . Azim ft deg (leg 11265.59 103.18 192.69 11296.11 101.34 194.78 11332,91 99.32 203.22 11365.64 93.16 208.84 11407,29 92,99 214.12 11450.24 94.39 222.20 11491.57 95.27 219.39 11523.87 90.18 220.44 11566.27 89.82 217.28 11601.15 85.61 212.36 11631.82 82.71 208.14 11675.67 79,80 202.16 11707.27 76.11 194.43 11727.07 73.65 191.62 11750.00 73.65 191.62 Date: 4/21/2.003 Time: 17:39:33 Page: 2 Co-or(jinate(NE}Reference: Welt P2-'54. Tru.e North. . .. Vertical(ìVD) !t¢ferenëe:· . 73 : 544/18/1994 00:00 4$;6 Sectioll (vS) RëCerence: vvell (0;00N;Q;00E,132;55Azi) . Survey Calculation Methöd: MlnimLimCul"iature Db: Oräclë TVD SSTVD N/S ElW MapN . ·MapE VS DLS·. ft ft ft ft ft ft ft deg/100ft 8846.10 8800.48 -3650.13 4655.08 5994495.92 686224.92 5897.68 18.70 8839.62 8794.00 -3679,10 4648.00 5994466.79 686218.55 5912.05 9.01 8833.01 8787.39 -3713,29 4636,21 5994432.32 686207,60 5926.49 23.22 8829.45 8783.83 -3742.50 4621.94 5994402.78 686194.04 5935.72 25.40 8827.22 8781.60 -3777.95 4600.23 5994366.81 686173.20 5943.71 12.67 8824.45 8778.83 -3811.63 4573,77 5994332.50 686147.57 5946,99 19.05 8820.97 8775.35 -3842.80 4546.87 5994300.69 686121.43 5948.25 7.10 8819.43 8773.81 -3867.54 4526.17 5994275.46 686101.34 5949.73 16.09 8819.43 8773.81 -3900.55 4499.57 5994241.81 686075.55 5952.46 7.50 8820.82 8775.20 -3929.15 4479.68 5994212.74 686056.36 5957.14 18.55 8823.95 8778.33 -3955.49 4464.31 5994186.03 686041.64 5963.64 16.64 8830.62 8785.00 -3994.70 4445.90 5994146.39 686024.18 5976,58 15.02 8837.22 8791.60 -4024.01 4436.19 5994116.86 686015.19 5989.25 26.62 8842.39 8796.77 -4042.62 4431.88 5994098.14 686011.34 5998.67 18.49 8848.84 8803.22 -4064.18 4427.45 5994076.49 686007.43 6009.98 0.00 \ ..... -3900 , It 1" ... -3950 . : .. .. '. _I I . . . , . . , . .. -4000-"~ , . T · 1 u ~ i · , , . '.' .......... : ." · D~ ~ ,. . . . . ~ . . . . . .., -4050~ '. , 'u .. "'-J .... ".' · , ,'" ..'" , ." , , · : , . : ......... vv , · · . . . . ., . ,,' . . . : · . . : . , . . ...... 'vV . " : '1100 ~'150 ¡2:X> 4250 43'00 435'0 ~h~ 445~ ~'5b~ 4550 · d6504'7XJ ¡' T, T' I" J:' -'- "5'd;~ · ¡ '5'1'5'~ ';2!0'~ ';2';~ ' , · West( -)/East( +) [50ft/in] , ...:.........." ..... ....'. : . .' ..... .- . ............. ,... .,- ... L m. '. ..... . .'. ." '" ,\ , : . · . : _ , .. ......... ..... 'u, u, . '"'''' ..",,, -,- .... ... ~ · ~ ,;;;~ . ..~ ..... '."': u .' .... ,,'> --,J':' :--~--, · " ,: -- "...,"" ','" · ., ." )..r' ....~ ,," : "'-- --- , -.' . , , . -- ~. . : . . . · , .~ .. ..... .. \ m) ... ." .~...': .. , · ..... .- ......... _... "'.'- ...:. .'. ."u, .." '"'' " --. \ · I ~<~" '\h ).IQJ . .. · : , . " .. · . · . · , · . . . · , : ,. " · . : · :., ... .. . ..'. : .". .' · · . . , , " .' , · .. . .. .' '. .,.. _ \ ., · . · ., ..... .. : , .' . : .. ... . , . · , , · · : , . . . : \'- . ."'" , " .. " · : , · . " :. :..... . .' . .. . }' , · , ' . , : : : , : : · . : · ". · . T ,u . 30)0 30 jO 3100 31;~ 3200 3250' · ' . '~~)O '. 'l :3'5¡5'~ 36 00 L' J':J '3'8!O~ '3'8!~~ ~'Jo'~ '. ~J;o .' ~'1 b'~ ' ~2'~~ . ' , , , , · ' , 43 DO 43 50 45 DC BP Amoco Parent Wellpath: Tie on MD: WELLPATH DETAILS P2·54A 500292247001 P2·54APB1 11175,00 Rig: Ref, Datum: Nordic 1 73: 54 4118/1994 00:00 45,6211 V,Sectlon Origin Origin Angle +N/·S +EI·W Starting From TVD 183,00' 0,00 0.00 0.00 REFERENCE INFORMATION Co-ordinate (N/E¡ Reference: Well Centre: P2-54, True North Vertical (iVD Reference: System: Mean Sea Level Section (VS Reference: Slot - 54 (O,OON,O,OOE) Measured Depth Reference: 73: 54 4/18/1994 00:00 45,62 Calculation Method: Minimum Curvature ANNOTATIONS TVD MD Annotation 8824,50 11175,00 KOP 8932,12 11692,00 m "EJ-W Shape ~illm12 :cl.~ ~m~ :mæ ~:r 8350 \ 8400 ,¡ 8450 8500 - C .- 8550 ~ 8600 - ;; 8650 ~ &8700 ~8750 :e 8800 ' G» > : G» 8850 ¡ ~ 8900 8950 . 9000 ¡ 9050 9100 . ' 2550 2600 2650 2700 2750 op LEGEND P2-54,P2-54A.Plan #JA - P2-54 tP2-54) P2-54 (P2-54APB1) - P2-54A T A\M , A f é 6a~er Hugh~s i~~~~(~}~~i~q,¡)Jm Wellpath: (P2-54IP2-54A) Azimuths to True North Magnetic North: 26.02' Stre~~~~~~~~~~~ Dip Angle: 80.90' Date: 3/24/2003 Model: BGGM2002 Created By: Blij Potnis Date: 4/21/2003 Contact nfonnatior:: INTEQ -3350 -3450- ". -3500 . 1 -1 ë'-355o-j' .- --1 æ -36~ o -i U) ~ ~-3650-1 + 1 ....... -~ .: -3700-1 1:: :1 0-3750,,-1 Z -! ;;::;. :ì ~-380~' .: ~'J .. I = -3850 ~ 0, In -J Vertical Section at 183.00° [50ft/in] ~/21/2003 5:~2 PM ~ -- ids C!\J~-~~----I" WLJL LOG TRANSMITTAL ) &03 '-o~ ~roActive Diagnostic Services, Inc. To: State of Alaska AOGCC 333 W. 7th Street Suite 700 Anchorage, Alaska 99501 RE: Distribution - Final Print[s) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the atten~ion of : Joey Burton / Jeni Thompson ProActive Diagnostic Services. Inc. P. O. Box 1369 Stafford, TX 77497 BP Exploration (Alaska), Inc. PetrotechnicalDataCenter LR2-1 900E. Benson Blvd. Anchorage, AK 99508 WELL DATE LOG TYPE DIGITAL OR CD-ROM 1 MYLAR / SEPIA FILM 1 BLUE LINE PRINT(S) REPORT OR BLUE LINE Open Hole 1 P2-54 3-3-03 Mech. CH ~~q\ 1 1 1 Res. Eva!. CH Caliper Survey Signed: ~o\ ~ ~_.y~,-O o's¿ ~-R'/\/\ Date: Print Name: ,'j.,',. ,,....,.., r. ~}:' .,-, i"{ ¡ ~ --: f"1~ \~ . t~ ~,"".., I ~~ .1 ~~ ~, ~.. ~ tV f~''--''''~ :¡ :'7 ~ \, ''.\1 t """"'¡; ~ \~I,\ '¡:","-:"'-.'\ ~'¡r ~:ð ,,~ 1\ P ~;) ') ....\ t..... . \ t-' "'" ,; I,' ~.. ) - -' ". :'::'. ~~'~',,,¿:.,,~.., l' ...·t.:'.:~.".<-~.·.. .~_.: ~'J":"y~~"n ~~,ßt:OT! .'-\\dSK~~':; -' - - . ' - - ß~n~~'hor~~\;e PRoAcTÍVE DiAGNOSTic SERVicES, INC., } 10 K STREÐ SUiTE 200, ANClioRAGE, AK 99~01 Phone:(907) 245-8951 Fax:(907) 245-8952 E-mail: pdsanchorage@memorylog.com Website: W\Vw.memorylog.com ~'b"b f'f\'~ I.JS r~ '-=\J II· WL1L LOG TRANSMITTAL 803 -O~ ) 'roActive Diagnostic Services, Inc. To: State of Alaska AOGCC 333 W. 7th Street Suite 700 Anchorage, Alaska 99501 RE : Distribution - Final Print( s] The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of : Joey Burton / Jeni Thompson ProActive Diagnostic Services, Inc. P. O. Box 1369 Stafford, TX 77497 BP Exploration (Alaska], Inc. PetrotechnicalData Center LR2-1 900 E. Benson Blvd. Anchorage, AK 99508 LOG DIGITAL MYLAR / BLUE LINE REPORT WELL DATE TYPE OR SEPIA PRINT(S) OR CD-ROM FILM BLUE LINE Open Hole 1 1 1 Res. Eva/. CH \e°J.\'ô 1 1 P2-54 3-7 -03 Mech. CH 1 Caliper Survey 3igned: ~~ - ~ '-- ,~c:~,,:"- 'v"\. -:\~ '-c....~.'" ~~~ Date: ::>rint Name: ~E~, C:; J:", ,r. ~~: '") ,- I''', i . \ L.. : ;,.'" '"-.'.. ',.-. ".. .' ," .~. . .... .,..~:'.·.:~::b~~~..·. - - '..t". - ...... .......'. L. -' PRoAcTivE DiAGNOSTic SERVicES, INC., ~ 10 K STREET SuiTE 200, ANClioRAGE, AK 99501 Phone:(907) 245-8951 Fax:(907) 245-8952 E-mail: pdsanchorage@memorylog.com Website: www.memorylog.com ~~~\'C\~ ids ~ II' WL1L LOG TRANSMITTAL 10 3-ê) 2ê) 'roActive Diagnostic Services, Inc. To: State of Alaska AOGCC 333 W. 7th Street Suite 700 Anchorage, Alaska 99501 """'\~::\::;~ '''{\ ~:~r~') RE : Distribution - Final Print( s) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of : Joey Burton / Jeni Thompson ProActive Diagnostic Services, Inc. P. O. Box 1369 Stafford, TX 77497 BP Exploration (Alaska), Inc. Petrotechnital Data Center LR2-1 900 E. Benson Blvd. Anchorage, AK 99508 LOG DIGITAL MYLAR / BLUE LINE REPORT WELL DATE TYPE OR SEPIA PRINT(S) OR CD-ROM FILM BLUE LINE P2 - 6L~ Open Hole 1 1 1 l~ - '2-~ ~Q.3 ~. Res. Eva!. CH ,f:)031 1 1 1 Mech. CH 1 Caliper Survey Signed: ~d. "'-~ ,~'- ç ç.., ~ It'- j'v'\ Date: Print Name: RE~CE.'VED p,?E 2"\ Z003 Aisska 0;; & Gas Cons. Commtseion ~,chorage PRoAcTivE DiAGNOSTic SERVicES, INC., ~ 10 K STREB SUÍTE 200, ANCHORAGE, AK 99501 Phone:(907) 245-8951 Fax:(907) 245-8952 E-mail: pdsanchorage@memorylog.com Website: www.memorylog.com ~~~ N\~ P2-54A, 10-401 Permit to Drill # 203-030 ) ) Subject: P2-54A, 10-401 Permit to Drill # 203-030 Date: Thu, 13 Mar 2003 14:31:46 -0600 From: "Sherwood, Alistair" <SherwooA@BP.com> To: "Winton Aubert (E-mail)..<winton_aubert@admin.state.ak.us> Winton, For Point Mcintyre well P2-54A we have decided to swap to 2" coil tubing & drill with 2-3/8" tools. This change allows us to operate without restriction through the 3-1/2" tubing tailpipe. The permit application was written & approved for a jointed string of 2-1/16" CSH, attached to the bottom of the 2-3/8" coil. This would have allowed us to operate through the 3-1/2" tailpipe without a need to change out coil & injector gripper blocks for just the one well. For this operation we had acquired a set of 2-1/16" pipe rams, but these will not now be used So for the 2" CT operation the the ram configuration on the BOPE from the bottom up is: · 2" combi pipelslip · 2-318" combi pipelslip · choke/kill X-over · 2" combi pipe/slip · blindlshear If you have any questions or need further clarification, feel free to e-mail or call Regards Alistair Sherwood Coil Tubing Drilling En\lìneer Grøater Prudhoe Bay SF) Exploration (AlasIŒ) 900 E, Benson Blvd, AnchoraçJe. +(90'7) f>64 4~~7ß ;'(907) 440 8301 @'TI'~'V~ Qi)ULrùU~ ) m; F !Æ ~!Æ~~~!Æ '1 A.I/A.~KA OIL AND GAS CONSERVATION COMMISSION I / / FRANK H. MURKOWSKI, GOVERNOR 333 W. TH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Mark O. Johnsoon CT Drilling Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage AK 99519 Re: Point McIntyre P2-54A BP Exploration (Alaska), Inc. Permit No: 203-030 Surface Location: 551' SNL, 1233' EWL, Sec. 14, TI2N, RI4E, UM Bottomhole Location: 4727' SNL, 373' EWL, Sec. 13, TI2N, RI4E, UM Dear Mr. Johnson: Enclosed is the approved applicatio'n for permit to redrill the above development welL This permit to· redrill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's North Slope petroleum field inspector at 659-3607 (pager). Sincerely, ~~V'~ L~/L-~ Randy Ruedrich Commissioner BY ORDER OF THE COMMISSION DATED this.2i- day of February, 2003 cc: Department ofFish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Exploration, Production and Refineries Section vJC¡ It- ¿.l zs !2-CCJ3 ALASKA C " STATE OF ALASKA )AND GAS CONSERVATION COMMIL )oN PERMIT TO DRILL 20 AAC 25.005 1 b. Type of well 0 Exploratory 0 Stratigraphic Test /I Development Oil o Service 0 Development Gas 0 Single Zone 0 Multiple Zone 5. Datum Elevation (DF or KB) 10. Field and Pool KBE = 45.62' Point Mcintyre 6. Property Designation ADL 034624 7. Unit or Property Name Point Mcintyre 8. Well Number /' P2-54A 9. Approximate spud da~/ 03/05/03 Amount $200,000.00 14. Number of acres in property 15. Proposed depth (MD and TVD) 2560 /11840' MD / 8880' TVDss 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} 105 0 Maximum surface 3370 psig, At total depth (TVD) 8800' I 4250 psig Setting Depth Top Bottom Quantity of Cement Lenath MD TVD MD TVD (include staae Qata) 1240' 10600' 8627' 11840' 8880' 39 sx Class 'G' r 11. Type Bond (See 20 AAC 25.025) 1 a. Type of work 0 Drill /I Redrill ORe-Entry 0 Deepen 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface x = 681483, Y = 5998032 551' SNL, 1233' EWL, SEC. 14, T12N, R14E, UM At top of productive interval x = 686055, Y = 5994885 3808' SNL, 444' EWL, SEC. 13, T12N, R14E, UM At total depth x = 686008, Y = 5993965 4727' SNL, 373' EWL, SEC. 13, T12N, R14E, UM Number 2S100302630-277"' 12. Distance to nearest property line 13. Distance to nearest well /' ADL 365548,4727' MD No Close Approach 16. To be completed for deviated wells Kick Off Depth 10795' MD Maximum Hole Angle 18. CaSingJ~~gram Specifications Hole Casina Weight Grade Couplina 2-3/4" x 3" 2-3/8" 4.6# L-80 ST-L 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner Scab Liner 11180 feet 9141 feet 11 080 feet 9059 feet Length Plugs (measured) Junk (measured) Size Cemented MD TVD 80' 20" 3905' 10-3/4" 11133' 7-5/8" 4830' 5-1/2" 260 sx Arcticset (Approx.) 1166 sx Coldset III, 375 sx Class 'G' 110' 3940' 110' 3721' 590 sx Class 'G' 11164' 9128' 219 sx Class 'G' 572ß'~, 1:¡Ö$56' ,", ¡'" 5046' - 8639' Perforation depth: measured 10794' - 10824', 10844' - 11008' r:.. ~. true vertical 8825' - 8850', 8866' - 9000' 20. Attachments /I Filing Fee 0 Property Plat /I BOP Sketch 0 Diverter Sketch /I Drilling Program /I Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report /I 20 AAC 25.050 Requirements Contact Engineer Name/Number: Mark Johnson, 564-5666 Prepared By NamelNumber: Terrie Hubble, 564-4628 21. I~:~::y :::H~b::.th:J;ils t~~~E£:~=g~e~:~;er Date 2h 3!(J] Permit Number;.) r:," ,.'~ G API Num6ér Appr~aJ. ~t J1J~ ~ See cover letter "^ v) .~ è.» 50- 029-22470-01 (J - ^ ~ r J I' for other reauirements Conditions of Approval: Samples Required 0 Yes f6I No Mud Log Recuired' D,Yes rlf No Hydrogen Sulfide Measures .ø Yes 0 No Directional Survey Required I;(Yes 0 No Required Working Pressure for BOPE 0 2K 0 3K 0 4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU Other: Piliv" ~c Me... 25. "~(ç fC)) ~ltty^t'I.....,tL Be: P E is. C\..fP""ll ~d. ,-eq,~th~fSïØifed~c p~ (' . by order of ) /7/1 n Approved By ~ RuIMIrich Commissioner the commission Date ~ ~) fy'7 Form 10-401 Rev. 12-01-85 SuQrrìit In Triplicate ) ) BP P2-54A Sidetrack Summary of Operations: / Well P2-54 is scheduled for a through tubing sidetrack with the SLB/NOæd" Cojled Tubing Drilling rig. The sidetrack, P2-54A, will kick offffom a cement ramp window a 07 ,5' md. The P2-54A target is the Pt. Mac formation. The following describes work planned the sidetrack. Sundry form 10-403 was submitted for the pre sidetrack P&A. A schematic diagram of the proposed sidetrack is attached for reference. Pre CTD P&A Summary (expected to begin 2/23/03) 1. Slickline - Drift tubing and tag bottom. 2. Service coil - Scale blast tubing and casing. 3. Slickline - Drift tubing for caliper. Caliper casing and tubing. Dummy GL V s. MITIA/OA. 4. Service coil - P&A wellbore with --24 Bbls of 17 ppg class G cement for cement ramp window. Final TOe is planned for 10715' md. 5. Other - WOC, PT wellbore to 1000 psi. P&A complete. If the cement were to fail the pressure test, a second squeeze is not planned since this portion of the wellbore will be isolated by cement during the primary cement job of the new sidetrack liner. Bleed flowlines to zero and ensure valves hold. Remove wellhouse. CTD Sidetrack Summary (ex»ected to be~in .....3/5/03) 1. MIRV CTD rig / /' 2. Mill out 2.635"XN nipple to 2. 7?:~ and mill cement ramp window. 3. Drill2.75"x 3" openhole to -- ¡f1"~ ..... TD with MWD/GR. // 4. Run and cement 2 3/8" liner.' "ñ liner top packer if necessary. 5. RDMO. Mud Program: · Phase 1: Seawater /" · Phase 2: Mill with biozan brine 9.5 ppg, drill with Flo-Pro (9.5-9.6 ppg) Disposal: · All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. · All Class I wastes will go to Pad 3 for disposal. Casing Program: · 2 3/8" cemented liner completiçn from 10600' to 11840' TD. Liner cement (15.8 ppg class G) volume is planned to b~IS, ) ') Well Control: · BOP diagram is attached. · Pipe rams, blind rams and the CT pack off will be pressure tested to 400 psi and to 3 ~OO F~'/ · The annular preventer will be tested to 400 psi and 2500 psi. I z- ~ 'I Vi L úooo ø ' Note: There,~~,3'1h) tubing in the current wellbore, requiring that CTD drills a slimhole sidetrack /' (2.75" x 3" bice~(bit). While drilling, joints of2 1/16" CS hydril will be attached to the bottom of the 2 3/8"<éóíI tubing to provide more annular clearance (t~prove hydraulics) through the 3 ~" tubing section from 5668' md to TD of the well at 11840'. In this case the length of2 1/16" CSH tubing is being considered part of the drilli1}g-'BJIA. As such the BOP pipe rams will not be .,---- sized for the 2 1/16 CSH (not available). Th~~~riÍajority of the drilling operation will have 2 3/8" coil across the BOPs. When tripping th~1/16" CSH, ajoint of2 3/8" tubing with TIW valve on top and crossover to 2 1/16" CSH on bottom will be immediately available to stab on the CSH and run across the BOPs in the unlikely event of a well flow incident. Directional · See attached directional plan. Max. planned hole angle is 106 deg. · Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. Logging · An MWD Gamma Ray log will be run over all of the open hole section. A memory resistivity log is planned. lIazards ~ . The highest H2S from P2-54 was 25 ppm on 1/14/03. PM2 is not an H2S pad. Highest recorded on the pad was 60 ppm from P2-41 in 6/99. . Drilling near faults, but with low risk of lost circulation. Reservoir Pressure /" Res. press. is estimated to be(Ø4 ..9)PSi at 8800'ss (9.3 ppg EMW). gas (0.10 psi/ft) to surface is 3 psi. .,~ MOl 2/13/03 Max. surface pressure with · TREE = , 4-1/16"CIW ·~~ft1~~:·"····BÄï<;~ ) 'i<ii··ËlBi·;;;····· ......... '·46:95;' ·š"F.··ËLËV·;·······················14' ........................................................................................ KOP= 1500' ~ ·Mäx·An~ïJë..;···_·43··@·ä49·3.- ~~~t~~~~~~~~tär~ c:. ~^ 10-3/4" CSG, 45.5#, L-80, ID = 9.953" 1-1 3940' ~ Minimum ID = 2.635" @ 10679' 3-1/2" HES XN NIPPLE 4-1/2" TBG, 12.6#, 9-CR, 0.0152 bpf, ID= 3.958" 1-1 5666' 1 7-5/8" X 5-1/2" BKR LNR HNGR. ID= 4.875" 1--1 5126' 3-1/2" TBG, 9.2#, 13-CR, .0087 bpf, ID= 2.992" l-i 10500' I 15-112" SCAB LNR, 17#, L-80, ID = 4.892" l-i 10556' I 3-1/2" TTP, 9.2#, 13-CR, ,0087 bpf, ID= 2.992" l-i 10700' I 17-5/8" MARKER JOINTS (2 JTS = 39') 1--1 10722' ~ PERFORA TION SUMMA RY REF LOG: SÆRRY RES/GR of 05/11/94 ANGLEATTOPÆRF: 36 @ 10794' Note: Refer to A"oduction DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 10794 - 10824 0 07/22/94 3-3/8" 6 10844 - 10904 0 07/22/94 3-3/8" 6 10904 - 11008 0 07/21/94 I PBTD 1-1 11080' 7-5/8" CSG, 29.7#, 13-CR, 0,0459 bpf, ID = 6.875" l-i 11164' DATE 05/13/94 04/19/00 11/28/00 02/21/01 1 0/08/01 REV BY COMMENTS ORIGINAL COMA..ETION RVVO 51S-1s1 CONVERTED TO CANVAS 51S- LG REV ISJON CH/KAK CORRECTIONS DATE P2-54 \ I ....:.. ......... :::::::~. L 'to FErY NOTES: 4-1/2" & 3-1/2" CHROME ,13G IN WELL. 7-5/8" CSG X'S OVER FROM L-80 TO 13CHROME@ 10039'. 2185' l-i 4-112" CAMCO TRCP-4A, TRSV, ID = 3.812" GAS LIFT MANDRELS ~ ST MD iVD DEV TYÆ VLV L TCH PORT DATE 1 4331 4010 43 TMPDX DOMË BK 16 01/05/01 2 5610 4960 42 TMPDX DV BK 0 01/05/01 3 7216 6141 43 KBG-2-9 DOME INT 16 01/05/01 4 8195 6875 42 KBG-2-9 DV INT 0 01/05/01 5 9011 7478 42 KBG-2-9 S/O INT 24 01/05/01 6 9672 7972 42 KBG-2-9 DV INT 0 01/05/01 7 10413 8529 40 KBG-2-9 DV INT 0 01/05/01 I J 5668' 5711' 1-1 4-1/2" X 3-1/2" TBG XO, ID= 2.992" I l-l 7-5/8" X 5-1/2" BKR ZXP A<R, ID = 4.813" 10478' 1-1 3-1/2" HES X NIP, ID = 2.813" I 10500' I~ 5-1/2" X3-1/2" BKRSABL-3 A<R,ID= 2.780" 10679' l-i 3-1/2" HES XN NIP, ID = 2.635" 10701' l-i 3-1/2" WLEG, ID = 2.905" I 10715' 1-1 ELMD TT LOOGED 04/09/01 I ~ REV BY COMMENTS POINT MCINTY RE UNIT WELL: P2-54 ÆRMIT No: 194-0590 AA No: 50-029-22470-00 SEe 14, T12N, R14E. 550' SNL & 1233' EWL BP Exploration (Alas ka) ,TREE=. 4-1/16" CIW WELLHEAD = FMC ·Ä·ëi·üÃiõR"·,;;·······SÄ"KËR·C 'j(B"..·ËlË\r;;..···· ···········4·ËÜj~f . B"F..·ËlËV·;;;········· .......... n. '1'4'- ·j(Op·;;····...·····················1·ŠÖÖ;' ~¥~.~...~.~.~.~...~..~.-.-...~~...~..~.~~~:., DatumMD= 10818' ...................................................................... Datum TVD = 8800' SS ) e (ofdS"'¿ 10-3/4" CSG, 45,5#, L-80, ID = 9.953" 1-1 3940' Minimum ID = 2.635" @ 10679' 3-1/2" HES XN NIPPLE 4-1/2" TBG, 12.6#, 9-CR, 0.0152 bpf, ID= 3.958" 1-1 5666' I 7-5/8" X 5-1/2" BKR LNR HNGR, ID= 4.875" 1--1 5126' 3-1/2" TBG, 9.2#, 13-CR, .0087 bpf, ID= 2.992" 1-1 10500' I 15-1/2" SCAB LNR, 17#, L-80, ID = 4.892" 1--1 3-1/2" TTP, 9.2#, 13-CR, .0087 bþf, ID = 2.992" 1--1 1--1 10556' 10700' 17-5/8" MARKER JOINTS (2 JTS = 39') 10722' PERFORA TION SUMMA RY REF LOG: SÆRRY RES/GR of 05/11/94 ANGLEAT TOP PERF: 36 @ 10794' Note: Refer to Roduction DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3/8" 6 10794 - 1 0824 0 07/22/94 3-3/8" 6 10844 - 10904 0 07/22/94 3-3/8" 6 10904 - 11008 0 07/21/94 I PBTD 1-1 11080' I 7-5/8" CSG, 29.7#, 13-CR, 0.0459 bpf, ID = 6.875" 1-1 11164' DATE 05/13/94 04/19/00 11/28/00 02121/01 10/08/01 DATE 02/13/03 REV BY COMMENTS ORIGINAL COMA..ETK:>N R\tVO SIS-1s1 CONVERTED TO CANVAS SIS- LG REV ISION CHlKAK CORRECTIONS H I ~ ~ ~~ ~ ~ ~ 10795' md KOP I cmt ramp ~ ~window % B- ~ P2-54 8:::::::· ......... ...:-:..' ~ L \ I ~ ST 1 2 3 4 5 6 7 I "¥- FETY NOTES: 4-1/2" & 3-1/2" CHROME bG IN WELL. 7-5/8" CSG X'S OVER FROM L-80 TO 13CHROME @ 10039'. 2185' 1--1 4-1/2" CAMCOTRCP-4A, TRSV, ID=3.812" GAS LIFT MANDRELS MD lVD DEV TYPE VLV LTCH PORT DATE 4331 4010 43 TMPDX DOME BK 16 01/05/01 5610 4960 42 TMPDX DV BK 0 01/05/01 7216 6141 43 KBG-2-9 DOME INT 16 01/05/01 8195 6875 42 KBG-2-9 DV INT 0 01/05/01 9011 7478 42 KBG-2-9 S/O INT 24 01/05/01 9672 7972 42 KBG-2-9 DV INT 0 01105/01 10413 8529 40 KBG-2-9 DV INT 0 01/05/01 5668' 5711' 1--1 4-112" X 3-112" TBG XO, ID= 2.992" I l-i 7-5/8" X5-1/2" BKRZXPA<R, ID= 4.813" 10478" 1--1 3-1/2" HES X NIP, ID = 2.813" I 10500' I~ 5-112" X 3-1/2" BKR SABL-3 PKR, ID = 2.780" TOL at 10600' md with liner top packer I 10679' 1--1 3-1/2" HES XN NIP, ID = 2.635" I 10701' J-i 3-112" WLEG, ID= 2.905" I I 10715' 1---1 ELMDTT LOGGED 04/09/01 REV BY rmj COMMENTS ctd sidetrack proposed 11 840' POINT MCINTY RE UNIT WB..L: P2-54 ÆRMIT No: 194-0590 AA No: 50-029-22470-00 SEe 14, T12N, R14E, 550' SNL & 1233' BNL BP Exploration (Alaska) Azimuths to True North Plan: Plan #6 (P2-541PI~#6 P2-54A) Magnetic North: 26.08° Created By: Brij Potnis Date: 112 Magnetic Field Contact Information: Strength: 57551 nT Dip Angle: 80.90° Direct: (oo7) 267~613 Date: 1/2812003 Baker Hughes I~:ffi~~ r~t¡ü¿~lt;Mq,com Model: BGGM2002 T 4\~ /' .' LEGEND P2-54 (P2-54) Plan#6 P2-54A Plan #6 ::~ - . : l:·:'\; ,:. ~{:~}~ R:." BAKlR· ....:HlíöMIS bp ~.¥~.... %~ .-- .-_..'.__.----.---.-~_._-.--'_. INTE,Q " ,... ::..... ~ -3400'-,:¡:::: g -3500--;:),["','. t:. -3600"':Y':' £ -3700..·:L: i -3800'~!:"= z " ~ -3900 - .c ~-4000 o "'-4 -2900--.:} -3000":'j:' -3100·:T -3200':.1' -3300':L -4200"ij: -4300· '::~ -4400-'.: BP Amoco ~LLPATH D~AlL8 PI....I P2-54A SOOZ82247G01 parant W.llp.'hl P2-&4 TI. an MD: 10700.00 Rill Ref'. Dawml 73 ~ 54 ~1 Bt1 8M aO:OD 4~.62ft v·'·AC:li~ ~18~ï ~m; =::~I!ftD 113.00' 0,00 0,01 0.00 REFERENCE INFORMATION Co.ordinate {N/E\ Reference: Well Centre: P2-54, True North Ver,cal {TVD Reference: System: Mean Ses Leyel Section (VS Reference: Slot - 54 (O,OON.O,OOE) Measured Depth Reference: 73: 54 4/1 8/1994 00:00 45,62 Calculatlon Method: Minimum Curvature aECTION onAlL8 .D 11\0 Azt TYD +MJ.. .Ef-W OLe, T'ace Wee Tarte! 1 10700.00 11I.17 127'..7 170&.13 ·J221...34 4482.2'i 0.00 0.00 ZVU,'i1 2 10"4.02 n,OI UD,n 1711..22 --32.117.111 4IV8.11 3.411 14..78 ~01B.Da ;¡ 101101.82 41,111 13Q,7111 171Ø.1Z +-12US4 4.~A' 040.00 0.00 3023.38 : ~g.e:~:;: :::gg ~::~ :=1~ :~g~ ::~1: ~::gg ~g ~~~::g a 110Ilf.'7V 1ø..4.41 1.~.'1I IU2'.IIO ·3414.37 4111.1:1 11.00 1&00 32047.99 7 1U.U.fI 1M.U 201.78 1,".28 -312&.21 04101.10 11.00 Ia.OO 3480.27 8 114~,.G4 'D.aD 304.30 "..87 ·Jl1S,U 4187.0.4 1II.oa 11Q..OO 3871.B8 V 11531.04 n.n U8.118 l,n.·SJI .n09..OO 4J1J.11 11.00 21&.00 36615.40 1011B.81.04 12.011 214.07 "'0.33 -40111.07 44IJ.U 11.00 11a.OO 3777.94 11 11840.00 S4.01 1U.!I3 IIID.U -417&'.' 4424.U 111.ao 14a.oO 3931US1 ANNOTATIONS TAAocrOET-.cS TVD YO AnnÑU :.: ,s, :: _;,.,~ ~L: :~ :~g~:lJ ~g~:~ ~I:" ~~ ~~ 1m~~ ~~~ ~ 8782.1210808.82 3 88S3.80 101147.18 ~ 88S1.3710887.78 1 8142.10 11017.78 8 8778.28 11332.78 7 8788.87110t31.04 8 8777,8211831.04 8 8810,33 11818,04 10 8810.33 11e.4Q,Qe TO 4300 4400 4500 461 West(-)IEast(+) [100ft/in] .-, ".........¡....._ I It.........;....... _6 ... OolllJ! :~. ·(:?\r· , ~1~~ JiL,~dE ~,. t';; ~~,' ) BP ') Baker Hughes INTEQ Planning Report r&iill BAit.. . ·1UGHIt: ..............,.................................................. J.N1ßQ ---."- Compan~': BP Amoco Date: 1/28/2003 Time: 09:00:44 Page: 1 Field: Point Mac Co-ordinate(NE) Referen,cc: Well: P2-54 , True North Site: Pt Mac 2 Vertie,al (1'VD) Reference: System: Mean Sea Level Well: P2-54 Sedion (VS) Reference: Well (0.00N,0,00E,183,QOAzi) \\'ellpath: Plan#6 P2-54A SUn'ey Calculation Method: Minimum Curvature Db: Oracle ---~---~--._-------------~---- Field: Point Mac North Slope UNITED STATES Map System:US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea level Map Zone: Coordinate System: Geomagnetic Model: Site: pt Mac 2 TR-12-14 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft 5995140.76 ft 674873.98 ft Alaska, Zone 4 Well Centre BGGM2002 Latitnde: Longitnde: North Reference: Grid Convergence: 70 23 32.530 N 148 34 37.934 W True 1.34 deg Well: P2-54 Slot Name: 54 P2-54 Well Position: +N/-S 2735.73 ft Northing: 5998031.70 ft Latitnde: 70 23 59.406 N +E/-W 6675.14 ft Easting : 681482.87 ft Longitnde: 148 31 22.383 W Position Uncertainty: 0.00 ft Wellpath: Plan#6 P2-54A 500292247001 Current Datum: 73: 544/18/199400:00 Magnetic Data: 1/28/2003 Field Strength: 57551 nT Vertical Section: Depth From (TVD) ft 0,00 Targets Name Description Dip. P2-54A Polygon5.1 -Polygon 1 -Polygon 2 ·Polygon 3 -Polygon 4 -Polygon 5 -Polygon 6 -Polygon 7 -Polygon 8 -Polygon 9 -Polygon 10 -Polygon 11 -Polygon 12 -Polygon 13 -Polygon 14 -Polygon 15 -Polygon 16 P2-54A T5, 1 P2-54A T5.2 Annotation MD TVD ft ft 10700.00 8706,13 TIP 10794.62 8781.22 KOP 10808,62 8792.12 3 10947.15 8853.60 4 10987.79 8855.37 5 Drilled From: Tie-on Depth: Above System Datnm: Declination: Mag Dip Angle: +E/-W ft 0.00 Height 45.62 ft +N/-S ft 0.00 Map Map TVD +N/-S +E/-W Northing Easting Dir. ft ft ft ft ft -.----------..--------- - 0.00 -3391.34 4464.37 5994749.98 686028.00 0,00 -3391.34 4464.37 5994749.98 686028.00 0.00 -3511.43 4507.47 5994630.98 686074.00 0.00 -3649.79 4520.11 5994492.97 686090.00 0.00 -3803.44 4462.36 5994337.98 686036.00 0.00 -3901.42 4377.95 5994237.98 685954.00 0.00 -4018.84 4311.08 5994118.98 685890.01 0.00 -4174.27 4285.29 5993962.98 685868.00 0.00 -4181.95 4519.19 5993960.98 686102.00 0,00 -4082.07 4525,62 5994060.98 686106.00 0.00 -3969.19 4573.38 5994174.98 686151.01 0.00 -3824.61 4674.92 5994321.98 686249.00 0.00 -3678.81 4726.48 5994468.98 686297.00 0,00 -3504.65 4722.71 5994642,98 686289.00 0.00 -3328.19 4664,98 5994817.98 686227.01 0.00 -3187.89 4572.35 5994955.98 686131.00 0.00 -3301.71 4398.52 5994837.98 685960.00 8757.00 -3955.70 4511,68 5994186.98 686089,00 8880.00 -4174.97 4396.32 5993964.98 685979.00 P2-54 10700.00 ft Mean Sea Level 26.08 deg 80.90 deg Direction deg 183.00 <--- l,atitude ---> <--- Longitude --> Deg Min See Deg l\fin See ----- 70 23 26.039 N 148 29 11.656 W 70 23 26.039 N 148 29 11,656 W 70 23 24.858 N 148 29 10.396 W 70 23 23.497 N 148 29 10.029 W 70 23 21.987 N 148 29 11.722 W 70 23 21.023 N 148 29 14.195 W 70 23 19.869 N 148 29 16.155 W 70 23 18.340 N 148 29 16.913 W 70 23 18.264 N 148 29 10.065 W 70 23 19.246 N 148 29 9.875 W 70 23 20.356 N 148 29 8.474 W 70 23 21.777 N 148 29 5.499 W 70 23 23.211 N 148 29 3.986 W 70 23 24.924 N 148 29 4.093 W 70 23 26.659 N 148 29 5.781 W 70 23 28.040 N 148 29 8.491 W 70 23 26.921 N 148 29 13.583 W 70 23 20.489 N 148 29 10.281 W 70 23 18.333 N 148 29 13.662 W ~~ ·.::/::::::f·· .. ., ~ ,:~t::;.:~.'.'...:::;.;i.. . tJp ~:..' .. ) BP ) Baker ,Hughes INTEQ Planning Report BA&f&d . .",,$11I$ ·..,·,·....·.·...·.·c·...,·.·.·.·.·.·...·.......·,,·.·.......·...·.·." IN{ßQ· 2-' Compan)r': Field: Site: Well: Wellpath: BP Amoco Date: 1/28/2003 Time: 09:00:44 Page: Point Mac Co-ordinate(NE) Reference: Well: P2-54 , True North Pt Mac 2 Vertical (1'\:'0) Reference: System: Mean Sea level P2-54 Section (VS) Reference: Well (0.00N.0.00E,183.00Azi) Plan~6 P2~~~________________~~~~~· Cah:ulation Method: Minimum Curvature Db: Oracle Annotation l\ID ft I 11087,79 11332.79 11431.04 11531.04 11656.04 11840.00 TVD ft 8842,80 8779.26 8766.87 8777.52 8810.33 8880.33 6 7 8 9 10 TD Plan: Plan #6 Crest at 8767' SSTVD Principal: Yes Plan Section Information 1\1D ft 10700.00 10794,62 10808.62 10947.15 10987.79 11087.79 11332.79 11431.04 11531.04 111656.04 11840.00 Survey MD ft 10700.00 10725.00 10750.00 10764.48 10775.00 10794,62 10800.00 10808.62 10825.00 10850.00 10875.00 10900.00 10925.00 10947.15 10950.00 10975.00 10987.79 11000.00 11025.00 11050.00 Incl deg 38.87 36.08 41.68 85.00 90.00 104.48 104.53 90.00 77.76 72,05 64,01 Ind deg 38.87 38.13 37.39 36.96 36.65 36.08 38.23 41.68 46.47 54,06 61.87 69,82 77,85 85.00 85.35 88.43 90.00 91.77 95,39 99.01 11075.00 102.63 11087,79 104.48 11100,00 104,63 11125,00 104.89 11150.00 105.09 11175,00 105.23 11200.00 105.29 11225.00 105.29 Azim deg 127.97 130.76 130.76 156.30 159.79 163.76 201.76 204.30 195.56 214,07 185,53 Azim deg 127.97 128.67 129.40 129.83 130.15 130,76 130.76 130.76 135,29 140,97 145.63 149.65 153.27 156.30 156.55 158,69 159.79 160.27 161.24 162.23 163.23 163,76 165.64 169.51 173.39 177.27 181,16 185.05 TVD ft 8706.13 8781.22 8792.12 8853.60 8855.37 8842.80 8779.26 8766.87 8777.53 8810.33 8880.33 SSTVD ft 8706.13 8725.70 8745.46 8757.00 8765.42 8781.22 8785.51 8792.12 8803.88 8819,86 8833.12 8843.34 8850.30 8853.60 8853.84 8855.20 8855.37 8855.18 8853.62 8850.49 8845.80 8842,80 8839.73 8833.36 8826.89 8820.35 8813.77 8807.17 +N/-S ft -3221.34 -3257.81 -3263.54 -3362.79 -3400.44 -3494.37 -3726.39 -3815.83 -3909.00 -4018.07 -4175,91 N/S ft -3221.34 -3230.99 -3240.63 -3246.21 -3250.26 -3257.81 -3259.93 -3263.54 -3271.33 -3285.66 -3302.65 -3321,91 -3342.99 -3362.79 -3365.40 -3388.4 7 -3400.44 -3411.91 -3435.46 -3459.01 -3482.45 -3494,37 -3505,77 -3529.37 -3553.25 -3577,29 -3601.41 -3625.48 +E/-W ft 4452.29 4496.81 4503.4 7 4570.12 4585.29 4616.28 4605.10 4567.04 4533.17 4483.03 4424.92 EfW ft 4452.29 4464.50 4476.39 4483.13 4487.96 4496.81 4499.27 4503.47 4511.78 4524.55 4537.17 4549,35 4560,80 4570.12 4571.25 4580.75 4585,29 4589.46 4597,68 4605.45 4612.74 4616.28 4619,39 4624.59 4628.18 4630.15 4630.48 4629,17 Date Composed: Version: Tied-to: 1/28/2003 5 From: Definitive Path OLS Build Turn deg/100ft deg/100ft deg/100ft 0.00 0.00 0.00 3.45 -2.95 2.95 40.00 40.00 0.00 35.00 31.27 18.44 15.00 12.30 8.59 15.00 14.48 3.97 15.00 0.02 15.51 15.00 -14.78 2.58 15.00 -12.24 -8.74 15.00 -4.57 14,81 15.00 -4.37 -15.51 TFO deg 0.00 149.78 0,00 35.00 35.00 15.00 85.00 170.00 215.00 110,00 248.00 MapN ft 5994919.63 5994910,28 5994900.93 5994895.52 5994891.58 5994884.25 5994882.19 5994878.68 5994871.10 5994857,09 5994840.41 5994821.45 5994800.66 5994781.09 5994778,51 5994755,67 5994743.83 5994732.46 5994709.12 5994685.77 5994662.51 5994650,67 5994639,36 5994615.89 5994592.11 5994568.12 5994544,03 5994519.93 MapE ft 686011.80 686024.24 686036.36 686043.23 686048.16 686057.19 686059.70 686063.98 686072.47 686085.59 686098.62 686111.26 686123.22 686133.01 686134.21 686144.27 686149.09 686153.54 686162.33 686170.68 686178.53 686182.35 686185.75 686191.52 686195.69 686198.23 686199.15 686198.43 VS ft 2983.91 2992.91 3001.91 3007.13 3010.93 3018.00 3019.99 3023.38 3030,72 3044,36 3060.67 3079.26 3099.72 3119.00 3121.54 3144,09 3155.80 3167.04 3190.13 3213,24 3236,27 3247.99 3259.21 3282.51 3306.16 3330.07 3354.13 3378.24 Target DLS deg/100ft 0.00 3.45 3.45 3.45 3.45 3.45 40.00 40.00 35.00 35.00 35.00 35.00 35.00 35.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15,00 15.00 15.00 15.00 15.00 15.00 15.00 TFO deg 0.00 149.78 149.23 148.66 148.31 Tool TIP MWD MWD P2-54A T MWD 148.06 KOP 0.00 MWD 0.00 3 35.00 MWD 31.74 MWD 28.10 MWD 25.63 MWD 23,98 MWD 22.96 4 35.00 MWD 34.98 MWD 34.86 5 15.00 MWD 15,01 MWD 15,07 MWD 15.19 MWD 15,38 6 85,00 MWD 85.4 7 MWD 86.46 MWD 87.46 MWD 88.48 MWD 89.50 MWD ~#i ) BP ) .¡¡II BAØ(::R ';':,' :.:' . ., ~ ! HUCHlS ,~.Öp ." OJ'. . Baker Hughes INTEQ Planning Report .....,...."...........,..............,................................ tNlf!.Q Compan~': BP Amoco Date: 1/28/2003 Time: 09:00:44 Page: 3 Field: Point Mac Co-ordinate(NE) Reference: Well: P2~54, True North Site: Pt Mac 2 Vertical (TVD) Reference: System: Mean Sea Level Well: P2-54 Section (VS) Reference: Well (0.00N,0.00E,183.00Azi) \VeUpath: Plan#6 P2-54A Sur\'ey Calculation Method: Minimum Curvature Db: Oracle --~--_._---~----- -~~~_._-----_._-_.._---- ------------------_._~ ----~--- Survey --- 1\1D Incl Azim SSTVD N/S EIW MapN MapE VS DLS TFO Tool ft deg deg ft ft ft ft ft ft deg/100ft deg 11250.00 105.22 188.93 8800.59 -3649.41 4626.24 5994495.93 686196.08 3402.30 15.00 90.53 MWD 11275.00 105.09 192.82 8794.06 -3673.11 4621.69 5994472.14 686192.10 3426.19 15.00 91.55 MWD 11300.00 104.89 196.69 8787.59 -3696.46 4615.54 5994448.65 686186.52 3449.83 15.00 92,57 MWD 11325.00 104.62 200.56 8781.22 -3719.36 4607.82 5994425.56 686179.36 3473.11 15.00 93.57 MWD 11332.79 104.53 201.76 8779.26 -3726.39 4605.10 5994418.47 686176.81 3480.27 15.00 94.55 7 11350.00 101.98 202.22 8775.31 -3741.92 4598.82 5994402.79 686170.92 3496.11 15.00 170.00 MWD 11375.00 98.29 202.87 8770.91 -3764.65 4589.39 5994379.85 686162.04 3519.30 15.00 170.11 MWD 11400.00 94.59 203.51 8768.11 -3787.48 4579.61 5994356.79 686152.81 3542.61 15.00 170.22 MWD 11425.00 90.90 204.14 8766.91 -3810.32 4569.52 5994333.71 686143.29 3565.94 15.00 170.29 MWD 11431.04 90.00 204.30 8766.87 -3815.83 4567.04 5994328.14 686140.94 3571.58 15.00 170.32 8 11450.00 87.67 202.66 8767.25 -3833.21 4559.49 5994310.58 686133.82 3589.33 15.00 215.00 MWD 11475.00 84.60 200.50 8768.94 -3856.40 4550.32 5994287.18 686125.21 3612.97 15.00 215.03 MWD 11500.00 81.54 198.32 8771.95 -3879.80 4542.07 5994263.58 686117.53 3636.77 15.00 215.18 MWO 11525,00 78.50 196,10 8776.28 -3903.32 4534.78 5994239.90 686110.82 3660.63 15.00 215.44 MWD 11531.04 77.76 195.56 8777.53 -3909.00 4533.17 5994234.17 686109.34 3666.40 15.00 215.83 9 11550.00 76.80 198.30 8781.70 -3926.69 4527.79 5994216.36 686104.39 3684.35 15.00 110.00 MWD 11575.00 75.58 201.95 8787.67 -3949.48 4519.43 5994193.38 686096.60 3707.54 15.00 109.40 MWD 11600.00 74.42 205.65 8794.14 -3971.57 4509.69 5994171.06 686087.40 3730.11 15.00 108.52 MWD 11625.00 73.32 209.38 8801.08 -3992.87 4498.60 5994149.50 686076.83 3751.96 15.00 107.57 MWD 11650.00 72.29 213.15 8808.48 -4013.28 4486.21 5994128.79 686064.94 3772.99 15.00 106.53 MWD 11656.04 72.05 214.07 8810.33 -4018.07 4483.03 5994123.93 686061.87 3777.94 15.00 105.42 10 11675.00 71.01 211.28 8816.33 -4033.21 4473.32 5994108,56 686052.54 3793.56 15.00 248.00 MWO 11700.00 69.69 207.55 8824.74 -4053.71 4461.76 5994087.79 686041.4 7 3814.64 15.00 248.88 MWD 11725.00 68.46 203.76 8833.68 -4074.75 4451.65 5994066.51 686031.88 3836.18 15.00 250.14 MWD 11750.00 67.31 199.91 8843.09 -4096.24 4443.03 5994044.81 686023.79 3858.10 15.00 251 .49 MWD 11775.00 66.26 195.99 8852.94 -4118.09 4435.95 5994022.80 686017.24 3880.29 15.00 252.94 MWO 11800.00 65.31 192.01 8863.20 -4140.21 4430.43 5994000.56 686012.26 3902.67 15.00 254.49 MWD 11825.00 64.47 187.98 8873.81 -4162.50 4426.50 5993978.18 686008.87 3925.13 15.00 256.12 MWO 11839.24 64.03 185.65 8880.00 -4175.23 4424.98 5993965.42 686007.66 3937.92 15.00 257.83 P2-54A T 11840.00 64.01 185.53 8880.33 -4175.91 4424.92 5993964.73 686007.61 3938.61 15.00 258.84 TO P;¡-5 Lf A Ir~) V C" \rJ"""~ ¿/¿v--. C£YI./J-,J. ~ €ytt!$S 'i, / x It tf 0:' tÇ¡;, 7 ,~/ ßb I tNey TOl 0;;:' L ~--- ---= - . ,~ 7 fib J ! ~VvK,' ttJ 8 /3h Lhz.t1J - O. Of.) 3 , ) ~ ,3'- - 2,3 7S~- ~ --~~ 10 2.-·1 12 t.{() ~ ~ lôt 60 &1-{ò I o~oo \ \ -\- \ \ \ \ d z W .J u:: w ~ c d z w u. <C ¡:: w " c ~ m u. o d z I- W W :c tJ) -' ô ~ r:. C') C') C\ ~ c( ) --~'~~-:~- - /~: p~~,~- =,=~=~~=:';:;~c;'-J~:'; ._,=-,,~~---~~- I -:lit -L_~'t. __\'"' n -~-'..~"'-'--"=--=--"'.,~"~' -~- .;~....., -- -,- \~ c?r~~~~""~~·~~~~~ð~""""","",.;'_.~~~':-_--->---_:- ..... -==--=-----":.:. -' Mo5 ~fi J (ðJ .~~_.-~--'~"""'=...".~--=--.........--,.. ...J > â.. 0- <C ¡..: 0- W C I- Z a:: o 0 w w c w ~ w ~ m U) " ~ <C Z tJ) m w c.. .c ..tt~" ~..\~,,~~. ~:! ~:. l1't~.~~ ·'~'4-" = iC " ~ Z - œ III III Z - c:J Z III ) Nordic cro BOP Detail /UI I I I XO Spool as necessary \ / I I ® I I ® I I II THA I L ~ --;1 Tubing @ r Spool --, I I _~_ -@f:::tM ~ Methanol Injection .ðJlð Otis 7" WLA Quick II Connect - I 7-1/16" 10,5000 psi working pressure )r Ram Type Oual Gate BOPE Manual over Hydraulic \.. I I. K rc= HCR __ I r-rO~~fl7Lf L~~::J ~ I TOT Flanged Fire Resistant Kelly Hose to Dual Choke Manifold 7-1/16" 10, 5000 psi working pressure ~ Ram Type Dual Gate BOPE I TOT I""~ Manual over Hydraulic 1:: Full production christmas tree MOJ 9/15/02 ) o~ ~ ---CT Injector Head I 1 --- Stuffing Box (Pack-Off), 10,000 psi Working Pressure """- 7" Riser I I ~ Annular BOP (Hydril),7-1/16" 10 /' 5000 psi working pressure .J I I I I Blind/Shear I / ~ 12 3/8 II Combi PiPe/Sli~ Fire resistant Kelly Hose to Flange by Hammer up 1/4 Turn Valve on OS Hardline to StandpipE manifold I )1&!IJffiJ Ir~~ te l / 1/ 1/ 2" Side outlets F = I =1 2 3/8" Combi Pipe/Slip 23/8" x 3 1/2" VBRs 2 flanged gate valves Inner Annulus Outer Annulus NO""' .. .... < .... i r.rf.:~H .~f.J:Sf\~~O ~Yi 't:'t~"Jj;~~~J~~~~;fi~~~;:;::S '" . ,rIT ;(-fi,L... ..,. '," '" .. ".." .. . ... ..... :~::··:t~~·~J:~·i~~.~~~.~:\1:~·:~~::~~\~;:1 "'055000111 1:0 ~ ~ 20 ~8 c¡ 51: 0 ~ 2?8 q bill ALASKA OIL & GAS CONSERVATION C<JMMISSION 333 W 7TH AVENUE SUITE 100 ANCHORAGE, AK 99501 AMOUNT Deêémtiêtj 9,2002. ,- -.-.- - ..- .- *******t*1'*****$1 00.00*** '-"~ CONSOLIDATED COMMERCIAL ACCOUNT 56-389 ~ No. P055000 DATE 8:, . .....p.. · ç!), "·Z"· tßlt¡.. tfftti;:t'·"t·~, .JI; Iií, ....1 (. ,J;'I.."·W·'-: 'f/' . ..:. .......,..1.. (up f/1l'· 'm...·n~.u ',h. NATIONAL CITY BANK Ashland. Ohio A\aska Oil &. Gas Cons. Cmíln\\SSWí, Anchorage r-'r-¡1'~ ?or, '2; reD ì L. U...J '~./ R. r r 'r' i 'î! f"" r» , l\-,,« -- ~"IÌ I'¡= J. ~~".L,~L~. \1 ~"".~ H NET VENDOR DISCOUNT CHECK NO. P055000 DATE 12/19/2002 ~--~- ~- '- TOTAL ~ PERMIT TO DRILL FEE o /1 ..::::/1 1\ \' ,^-~Irr GROSS DESCRIPTION TO THE ORDER OF: PAY: BP EXPLORATION, (ALASKA) INC. PRUDHOE BAY UNIT PO BOX 196612 ANCHORAGE, AK 99519-6612 THE ATTACHED CHECK IS IN PAYMENT FOR ITEMS DESCRIBED ABOVE. 12/19/2002 INV# CK1217021 INVOICE I CREDIT MEMO DATE P055000 ) TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTER/PARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER f)-, fLf A ~û ~~- (j ~3() WELL NAME PTD# CHECK WHAT APPLIES ADD-ONS (OPTIONS) MUL TI LATERAL (If API number last two (2) digits are between 60-69) "CLUE" The permit is for a new wellbore segment of existing well Permit No, API No. Production should continue to be reported as a function 'of the. original API number stated above. HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and API number (50 70/80) from records, data and logs acquired for well (name on permit). PILOT (PH) SPACING EXCEPTION DRY DITCH SAMPLE Rev: 07/10/02 C\jody\templates The permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the Commission must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. j?f ¡V'/¿ t·J" t .~, WELL PERMIT CHECKLIST 'COMPANY I3 r X WELL NAME P;¿ .-i"L} f1 , FIELD & POOL ~ ~ &, r ð D INIT CLASS A.v ,I - û ,r , ADMINISTRATION 1. Permit fee attached. .................. W ~ 2. Lease number appropriate. . . . . . . . . . . . . . . . ~ 3. Unique well name and number. . . . . . . . . . . . . . . , . ~ N 4. Well located in a defined pool.. . . . . . . . . . . . . . . . . ~ NN 5. W ell located proper distance from drilling unit boundary. .'. . & 6. W ell located proper distance from other wells.. . . . . . . . . ~ N 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . ~ N ,\ 8. If deviated, is wellbore plat included.. . . . . . . . . . . . . . (:P N ~ ~ ~~}bt'..) 9. Operator only affected party.. . . . . . . . . . . . . . . . . . <f; NN 10. Operator has appropriate bond in force. . . . . . . . . . . . . ct 11. Permit can be issued without conservation order. . . . . . . . ~ N 12. Permit can be issued without administrative approval.. . . . . ~ N , (Service Well Only) 13. Well locate? v:(in ~rea & strata ~uth?rize? by injection order#_ Y YAI/A- (Service Well Only) 14. All wells w/In ~ mile area of review Identified. . . . . . . . . '. 'Ý' N ENGINEERING 15. Conductor string provided. . .. . . . . . . . . . . . . . . . Y N . 16. Surface casing protects all known USDWs. . . . . . . -¥-N- ~ 1/11...-- {' r , ~_, 17. GMT vol adequate to circulate on conductor & surf csg. . . . 'y N . (U " '~.::::> t a..e \:"v ~, t:- 18. GMT vol adequate to tie-in long string to surf csg. . . . . . . . Y.. N 19. CMT will cover all known productive horizons. . . . . . . .. . 20. Casing designs adequate for C, T, B & permafrost. . . . . . . , .' N C' . IA... 21. Adequate tankage or reserve pit. . . . . . . . . . . . . . . . . ¡o.. :~ z.- Tb'Il{ 0'2 22. If a re-drill, has a 10-403 for abandonment been approved. . . . (tlf- ;;) 23. Adequate wellbore separation proposed.. .'.' . . . . . ',,' . . 24. If diverter required, does ît meet regulations. . '. . . . . .. . ~¥ N i\41Pr- q , '. N lH. OL'lL ¡}Il L j . (¡, ) IJcJ . 25; Drilling fluid program schematic & equip list adequate. . . .. -1:. .,' N v.J ~ e-r ';;'1 r.-t.-t N J I {?d1¡- c- ~ tL Ad,,'ì ( 26. BOPEs, do they meet regulation. . . . . . . . . . . . . . . . ,M l' I) .. ;T'-"~ APPR DATE 27. BOPE press rating appropriate; test to ~ÇOO psig. N ;~ t -:J r '.S 3 0 pt;. t ~ " ....1 I 28'. Choke manifold complies w/API RP-53 (May 84). . . . . . . . N \¡..JGA- ~ 2.S 0 ~ 29. Work will occur without operation shutdown. . . . . . . . . . . ' ,þ!-, . 30. Is presence of H2S gas probable.. . . . . . . . . . . . . . . . Y ~ I I (Service Well Only) 31. Mechanical condition of wells within AOR verified. . . . . . .. "~y N . #/A-- " GEOLOGY 32. Plmt!it can be issued w/o hydrogen sulfide me~.s.u'Fes: . . . . ~Yy' "- APPR DATE 33. Data prè'S'eAteQ-pn potential overpres~"!,,lI:e"zC5ñes. . . . . . . . ....."-"...........,.,........"..."';,...... \\ . ,.-1." 734. Seismic analysis 'õfshaI.lQïJ-9.8s..zoríês. . . . . . . . . . . . . "'''''''' ~ ^"" \1b')~~ 35. Seabed c9.I).(iitiÐfl'"'5't1r;¡eY(ifoTf-Stm~. . . . . . . . . . . "~"''''-___.,. (Exploratory Only) 36. Gont~ame/phone for weekly progress rèþorts. . . . . . .. --...... APPR DATE Rev: 10/15/02 PROGRAM: Exp _ Dev _ Redrll ~ Re-Enter _ Serv _ Wellbore seg _ GEOL AREA '6 q 0 UNIT# I ( ~!:J~ 0 ON/OFF SHORE ð tit f .~ 20 MC ZS. O,3cÞ lc-)t1-)(A'ß"~ I ~ 11". GEOLOGY: RPC ~.~ PETROLEUM ENGINEERING: TEM RESERVOIR ENGINEERING JDH COMMISSIO. ~R:_/_ ¢Qí-~P ~~/03 DTS O~" s}o3 -Mi:Ir' ¡) ¥ ¿~J Commentsllnstructions: UIC ENGINEER JBR SFD_ WGA / MJW G:\geology\permits\checklist.doc ') ) Well History File APPENDIX Information of detailed nature that is not particularly gennane to the Well Pennitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPEN.DIX. No special effort has been made to chronologically organize this category of information. ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! -Version Information VERSo WRAP. -Well Information Block #MNEM.UNIT Data Type #--------- ------------- STRT.FT 10796.0000: STOP.FT 11692.0000: STEP.FT 0.5000: NULL. -999.2500: COMP. COMPANY: WELL. WELL: FLD . FIELD: LOC . LOCATION: CNTY. COUNTY: STAT. STATE: SRVC. SERVICE COMPANY: TOOL. TOOL NAME & TYPE: DATE. LOG DATE: API . API NYUMBER: -Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 14 TOWN.N 12N RANG. 14E PDAT. MSL EPD .F 0 LMF . RKB FAPD.F 46 DMF KB EKB . F 46 EDF .F N/A EGL .F 6 CASE.F N/A OSl . DIRECTIONAL -Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. ) **** REEL HEADER **** MWD 04/03/08 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 04/03/08 447646 01 1.75" NG *** LIS COMMENT RECORD *** Remark File Version 1.000 Extract File: ldwg.las 1.20: NO: ') CWLS log ASCII Standard -VERSION 1.20 One line per frame Information ------------------------------- c9 63 -- C):::O \ 'l-vt Ç} Starting Depth Ending Depth Level Spacing Absent Value BP Exploration (Alaska), Inc. P2-54A Point McIntyre 70 deg 23' 32.53" N 148 deg 34' 37.934" W North Slope Alaska Baker Hughes INTEQ 1.75" NaviGanuna - Ganuna Ray 25-Mar-03 500292247001 ~ ~~Í\'\~ Description ------------------------------- Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 RECEIVED H ,~, ') 1 6 ¡lu~4 \ . I .. \ .....1..: :~65h) Oil & Gas Cons. Commi'sion §:~~cl~(orage ") ) All depths are Bit Depths unless otherwise noted. All Gamma Ray data (GRAX) presented is realtime data. Well P2-54A was kicked off from well P2-54 at 10800 ' MD (8785' SSTVD). Well P2-54APB1 was drilled to TD at 11750' MD (8802' SSTVD) on MWD run 7. P2-54A was sidetracked from P2-54APB1 at 11175' MD (8824' SSTVD) on MWD run 8. (6) Baker Hughes INTEQ utilized Tiny Trak NaviGamma, slim hole directional, and Gamma Ray services. ' (7) The ROPS, Rate of Penetration, was omitted in the interval from 10794' MD (8783' SSTVD) to 10812' MD (8794' SSTVD) due to being logged after drilling. (8) The data presented here is final and has been depth shifted to a PDC (Primary Depth Control), recorded by SWS on March 27, 2003. (9) The interval from 11674' MD (8919' SSTVD) to 11692' MD (8930' SSTVD) was not logged due to sensor bit offset at TD. MNEMONICS: GRAX -> Gamma Ray MWD-AAPI [MWD] (MWD-API units) ROPS -> Rate of Penetration, feet/hour TVD -> Subsea True Vertical Depth, feet CURVE SHIFT DATA BASELINE, MEASURED, 10800.8, 10799.7, 10807.4, 10806.6, 10812.2, 10812.2, 10814.5, 10814.1, 10825.5, 10827.2, 10836.5, 10836.1, 10841.9, 10841.7, 10845.8, 10844.4, 10860.4, 10858.7, 10864, 10863.6, 10905.8, 10906.3, 10938.8, 10938.2, 10955.3, 10956.3, 10977.5, 10976.7, 11051.2, 11051.6, 11075.3, 11076.5, 11153, 11152.1, 11219.9, 11219.5, 11260.4, 11260, 11361. 6, 11360.1, 11427.4, 11426.4, 11493.3, 11490, 11508, 11503.9, 11525.7, 11521.9, 11537.7, 11532.5, 11557.4, 11550.2, 11572.8, 11565, 11582.4, 11575.5, EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX (2 ) (3) (4 ) (5) Tape Subfile: 1 Minimum record length: Maximum record length: **** FILE HEADER **** MWD .001 1024 DISPLACEMENT -1. 03906 -0.831055 o -0.415039 1. 66211 -0.416016 -0.208008 -1. 45508 -1.66309 -0.416016 0.416016 -0.624023 1.03906 -0.831055 0.415039 1.24707 -0.831055 -0.416016 -0.416016 -1. 45508 -1. 03906 -3.3252 -4.15625 -3.74121 -5.19531 -7.27344 -7.89648 -6.85742 92 records... 10 bytes 132 bytes ) ) *** INFORMATION TABLE: CONS MNEM VALU ------------------------------------ WDFN LCC CN WN FN COUN STAT mwd 5.xtf 150 BP Exploration (Alaska) Inc. P2-54A Point McIntyre North Slope Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 The data presented here is final and has been depth shifted to a PDC (Primary Depth Control) recorded by SWS, 27-Mar-03 *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP ---------------------------------------------------- GR ROP GR ROP GRAX ROPS 0.0 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 ------- 8 Total Data Records: 22 Tape File Start Depth Tape File End Depth Tape File Level Spacing Tape File Depth Units 10796.000000 11692.000000 0.500000 feet **** FILE TRAILER **** Tape Subfile: 2 31 records... Minimum record length: 54 bytes FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 GRAX MWD 68 1 AAPI 4 4 2 ROPS MWD 68 1 F/HR 4 4 ------- 8 Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 * FORMAT RECORD (TYPE# 64) 0.0 0.0 GRAX ROPS GRAX ROPS GRAX ROPS ---------------------------------------------------- ODEP *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field data. The interval from 10557 - 10636 feet MD was recorded in the parent wellbore and was used for tie-in purposes only. *** LIS COMMENT RECORD *** raw.xtf 150 BP Exploration (Alaska) P2-54A Point McIntyre North Slope Alaska WDFN LCC CN WN FN COUN STAT -------------------------------- *** INFORMATION TABLE: CONS MNEM VALU 1024 MWD .002 **** FILE HEADER **** 4124 bytes Maximum record length: ') ') ) ) Total Data Records: 55 Tape File Start Depth Tape File End Depth Tape File Level Spacing Tape File Depth Units 10555.000000 11692.000000 0.250000 feet **** FILE TRAILER **** Tape Subfile: 3 64 records... Minimum record length: Maximum record length: 54 bytes 4124 bytes **** TAPE TRAILER **** MWD 04/03/08 447646 01 **** REEL TRAILER **** MWD 04/03/08 BHI 01 Tape Subfile: 4 2 records... Minimum record length: Maximum record length: 132 bytes 132 bytes Tape Subfile 2 is type: LIS DEPTH 10796.0000 10796.5000 10800.0000 10850.0000 10900.0000 10950.0000 11000.0000 11050.0000 11100.0000 11150.0000 11200.0000 11250.0000 11300.0000 11350.0000 11400.0000 11450.0000 11500.0000 11550.0000 11600.0000 11650.0000 11692.0000 GR 75.0064 72.2696 53.7533 65.6474 51. 9198 63.4879 56.9036 38.6623 48.7322 44.4048 47.3666 44.8380 38.2656 39.1929 42.3507 42.0865 42.2800 53.9837 50.9078 136.1741 -999.2500 Tape File Start Depth Tape File End Depth Tape File Level Spacing Tape File Depth Units ) ) ROP -999.2500 -999.2500 -999.2500 21. 0880 42.6025 40.3203 55.7164 101.4103 91.5862 83.7881 90.0043 43.6719 66.9624 71.0585 90.4227 78.0840 83.1132 79.8948 55.4740 303.3627 -999.2500 10796.000000 11692.000000 0.500000 feet .. ',(" '", ) ) Tape Subfile 3 is type: LIS DEPTH GRAX ROPS 10555.0000 -999.2500 -999.2500 10555.2500 -999.2500 -999.2500 10600.0000 98.0400 -999.2500 10650.0000 240.2100 -999.2500 10700.0000 182.0900 -999.2500 10750.0000 123.9800 -999.2500 10800.0000 57.5700 -999.2500 10850.0000 58.4800 19.3400 10900.0000 54.0200 42.7200 10950.0000 63.9400 39.6200 11000.0000 61. 7600 56.2200 11050.0000 39.3800 101. 5000 11100.0000 50.3700 92.3800 11150.0000 43.9800 88.0600 11200.0000 46.4400 89.7100 11250.0000 46.8800 43.7600 11300.0000 38.4000 67.1200 11350.0000 37.8700 70.4000 11400.0000 45.5400 88.4500 11450.0000 45.2000 77.1500 11500.0000 38.9800 61. 7300 11550.0000 46.7100 88.7300 11600.0000 35.2500 63.0200 11650.0000 92.8500 58.1700 11692.0000 -999.2500 -999.2500 Tape File Start Depth 10555.000000 Tape File End Depth 11692.000000 Tape File Level Spacing 0.250000 Tape File Depth Units feet ) ) 803 -03;) ,~ J;). L(~J **** REEL HEADER **** MWD 04/03/22 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 04/03/14 RECEIVED 447646 01 1.75" NG ~1f\R 2 6 2004 /;~.1í~5¡~a Oil &: Gas Cons. Commilaion !}tnchorage *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 !!!!! ! !!!! ! ! !! ! ! !!! Extract File: Idwg.las -Version Information VERSo WRAP. -Well Information Block #MNEM.UNIT Data Type #--------- ------------- STRT.FT 10796.0000: STOP.FT 11750.0000: STEP.FT 0.5000: NULL. -999.2500: COMP. COMPANY: WELL. WELL: FLD . FIELD: LOC . LOCATION: CNTY. COUNTY: STAT. STATE: SRVC. SERVICE COMPANY: TOOL. TOOL NAME & TYPE: DATE. LOG DATE: API . API NYUMBER: -Parameter Information Block #MNEM.UNIT Value #--------- ------------------------- SECT. 14 TOWN.N 12N RANG. 14E PDAT. MSL EPD .F 0 LMF . RKB FAPD.F 46 DMF KB EKB .F 46 EDF .F N/A EGL .F 6 CASE.F N/A OSl . DIRECTIONAL -Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. 1. 20: NO: CWLS log ASCII Standard -VERSION 1.20 One line per frame Information ------------------------------- Starting Depth Ending Depth Level Spacing Absent Value BP Exploration (Alaska), Inc. P2-54APBl Point McIntyre 70 deg 23' 32.53" N 148 deg 34' 37.934" W North Slope Alaska Baker Hughes INTEQ 1.75" NaviGarnma - Gamma Ray 22-Mar-03 500292247070 Description ------------------------------- Section Township Range Permanent Datum Elevation Of Perm. Datum Log Measured from Feet Above Perm. Datum Drilling Measured From Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Casing Depth Other Services Line 1 ~~, . "'~~ -\~ f\\.~ ) ) All depths are Bit Depths unless otherwise noted. All Gamma Ray data (GRAX) presented is realtime data. Well P2-54APB1 was kicked off from well P2-54 at 10800 ' MD (8785' SSTVD). Well P2-54APB1 was drilled to TD at 11750' MD (8803' SSTVD). Baker Hughes INTEQ utilized Tiny Trak NaviGamma, slim hole directional, and Gamma Ray services. (7) The ROPS, Rate of Penetration, was omitted in the interval from 10794' MD (8783' SSTVD) to 10812' MD (8794' SSTVD) due to being logged after drilling. (8) The data presented here is final and has been depth shifted to a PDC (Primary Depth Control), recorded by SWS on March 27, 2003. (9) The interval from 11732' MD (8798' SSTVD) to 11750' MD (8803' SSTVD) was not logged due to sensor bit offset at TD. . MNEMONICS: GRAX -> Gamma Ray MWD-AAPI [MWD] (MWD-API units) ROPS -> Rate of Penetration, feet/hour TVD -> Subsea True Vertical Depth, feet CURVE SHIFT DATA BASELINE, MEASURED, 10800.8, 10799.7, 10807.4, 10806.6, 10812.2, 10812.2, 10814.5, 10814.1, 10825.5, 10827.2, 10836.5, 10836.1, 10841.9, 10841.7, 10845.8, 10844.4, 10860.4, 10858.7, 10864, 10863.6, 10905.8, 10906.3, 10938.8, 10938.2, 10955.3, 10956.3, 10977.5, 10976.7, 11051.2, 11051.6, 11075.3, 11076.5, 11153, 11152.1, EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX (2 ) (3) (4 ) (5 ) (6 ) Tape Subfile: 1 Minimum record length: Maximum record length: **** FILE HEADER **** MWD .001 1024 *** INFORMATION TABLE: CONS MNEM VALU DISPLACEMENT -1. 03906 -0.831055 o -0.415039 1. 66211 -0.416016 -0.208008 -1. 45508 -1. 66309 -0.416016 0.416016 -0.624023 1.03906 -0.831055 0.415039 1.24707 -0.831055 80 records... 10 bytes 132 bytes ------------------------------------ WDFN LCC CN WN FN COUN STAT p2-54Apb1.xtf 150 BP Exploration (Alaska) Inc. P2-54APB1 Point McIntyre North Slope Alaska ) ) *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 The data presented here is final and has been depth shifted to a PDC (Primary Depth Control) recorded by SWS, 27-Mar-03 *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP ---------------------------------------------------- GR ROP GR ROP GRAX ROPS 0.0 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units 1 GR MWD 68 1 AAPI 2 ROP MWD 68 1 F/HR Size Length 4 4 4 4 ------- 8 Total Data Records: 23 Tape File Start Depth Tape File End Depth Tape File Level Spacing Tape File Depth Units 10796.000000 11750.000000 0.500000 feet **** FILE TRAILER **** Tape Subfile: 2 32 records... Minimum record length: Maximum record length: 54 bytes 4124 bytes **** FILE HEADER **** MWD .002 1024 ) ) *** INFORMATION TABLE: CONS MNEM VALU -------------------------------- WDFN LCC CN WN FN COUN STAT raw.xtf 150 BP Exploration (Alaska) P2-54APB1 Point McIntyre North Slope Alaska *** LIS COMMENT RECORD *** !!!!!!!!!!!!!!!!!!! Remark File Version 1.000 This file contains the raw-unedited field data. The interval from 10557 - 10636 feet MD was recorded in the parent wellbore and was used for tie-in purposes only. *** INFORMATION TABLE: CIFO MNEM CHAN DIMT CNAM ODEP ---------------------------------------------------- GRAX ROPS GRAX ROPS GRAX ROPS 0.0 0.0 * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0.500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units Size Length 1 GRAX MWD 68 1 AAPI 4 4 2 ROPS MWD 68 1 F/HR 4 4 ------- 8 Total Data Records: 29 Tape File Start Depth Tape File End Depth Tape File Level Spacing Tape File Depth Units 10555.000000 11732.000000 0.500000 feet **** FILE TRAILER **** Tape Subfile: 3 38 records... Minimum record length: Maximum record length: **** TAPE TRAILER **** MWD 04/03/14 447646 01 **** REEL TRAILER **** MWD 04/03/22 BHI 01 Tape Subfile: 4 Minimum record length: Maximum record length: ) ) 42 bytes 4124 bytes 2 records... 132 bytes 132 bytes Tape Subfile 2 is type: LIS DEPTH 10796.0000 10796.5000 10800.0000 10850.0000 10900.0000 10950.0000 11000.0000 11050.0000 11100.0000 11150.0000 11200.0000 11250.0000 11300.0000 11350.0000 11400.0000 11450.0000 11500.0000 11550.0000 11600.0000 11650.0000 11700.0000 11750.0000 GR 75.0064 72.2696 53.7533 65.6474 51. 9198 63.4879 56.9036 38.6623 48.7322 44.4048 43.3700 40.8600 59.1900 60.1500 55.7400 74.2400 80.4000 76.2400 90.1200 52.6500 127.7400 -999.2500 Tape File Start Depth Tape File End Depth Tape File Level Spacing Tape File Depth Units ") ) ROP -999.2500 -999.2500 -999.2500 21.0880 42.6025 40.3203 55.7164 101. 4103 91.5862 83.7881 93.5000 90.1000 84.2000 48.8000 55.6000 73.0500 61.3000 43.4500 50.4500 55.1000 32.5500 -999.2500 10796.000000 11750.000000 0.500000 feet ) " Tape Subfile 3 is type: LIS DEPTH GRAX ROPS 10555.0000 -999.2500 -999.2500 10555.5000 -999.2500 -999.2500 10600.0000 98.0400 -999.2500 10650.0000 -999.2500 -999.2500 10700.0000 -999.2500 -999.2500 10750.0000 -999.2500 -999.2500 10800.0000 56.6900 -999.2500 10850.0000 64.1800 19.8500 10900.0000 50.9100 43.4000 10950.0000 63.4800 41. 3000 11000.0000 56.2000 58.9999 11050.0000 37.7200 103.1500 11100.0000 47.6900 92.7500 11150.0000 45.6400 84.9500 11200.0000 41. 3700 93.3000 11250.0000 41.1900 89.5000 11300.0000 54.1000 33.5000 11350.0000 67.0200 95.2000 11400.0000 56.9400 59.7500 11450.0000 73.1900 68.9999 11500.0000 83.1000 60.1500 11550.0000 83.0300 42.8500 11600.0000 153.1800 50.8500 11650.0000 56.5000 28.5000 11700.0000 46.7400 35.4500 11732.0000 -999.2500 40.2500 Tape File Start Depth 10555.000000 Tape File End Depth 11732.000000 Tape File Level Spacing 0.500000 Tape File Depth Units feet