Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
215-185
ar5--lgf- Guhl, Meredith D (CED) From: Schwartz, Guy L (CED) Sent: Thursday, June 27, 2019 3:55 PM To: Davies, Stephen F (CED); Seamount, Dan T (CED); Chmielowski, Jessie L C (CED); Roby, David S (CED); Colombie, Jody J (CED); Guhl, Meredith D (CED); Rixse, Melvin G (CED); Ballantine, Tab A (LAW); Regg, James B (CED) Subject: RE: Bonding letters update - Pioneer Natural Resources Wells Agree.. drop them from the list. Guy Schwartz Sr. Petroleum Engineer AOGCC 907-301-4533 cell 907-793-1226 office CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC(, State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Guy Schwartz at (907-793-1226 ) or (Guv schwartz@alaska aov(. From: Davies, Stephen F (CED) Sent: Thursday, June 27, 2019 2:33 PM To: Seamount, Dan T (CED) <dan.seamount@alaska.gov>; Chmielowski, Jessie L C (CED) <jessie.chmielowski@alaska.gov>; Roby, David S (CED) <dave.roby@alaska.gov>; Colombie, Jody J (CED) <jody.colombie@alaska.gov>; Guhl, Meredith D (CED) <meredith.guhl@alaska.gov>; Schwartz, Guy L (CED) <guy.schwartz@alaska.gov>; Rixse, Melvin G (CED) <melvin.rixse@alaska.gov>; Ballantine, Tab A (LAW) <tab.ballantine@alaska.gov>; Regg, James B (CED) <jim.regg@alaska.gov> Subject: RE: Bonding letters update - Pioneer Natural Resources Wells All, Pioneer has two wells on the bond list: Hailstorm 1 (2151850) and Cronus 1 (2160140). Based on site photos in the well history files, no significant surface disturbance visible on very good -resolution Google Earth photos, and concurrence from Jim, Guy and/or Mel, I vote to change the location clearance status in RBDMS, drop these wells from the bond list, and eliminate the bond letter to Pioneer. Thoughts? Thanks, Steve D. CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCQ State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.daviesis alaska Rov. From: Davies, Stephen F (CED) Sent: Thursday, June 27, 2019 1:46 PM STATE OF ALASKA LASKA OIL AND GAS CONSERVATION COMM! REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon 0 Plug Perforations 0 Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate ® Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 215-185 3. Address: P.O.Box 196612 Anchorage, Development p Exploratory 0 AK 99519-6612 Stratigraphic 0 Service 0 6. API Number: 50-029-20686-01-00 7. Property Designation(Lease Number): ADL 0028279 8. Well Name and Number: PRUDHOE BAY UNIT R-16A 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 15858 feet Plugs measured feet true vertical 9030 feet Junk measured feet Effective Depth: measured 15760 feet Packer measured 11177 feet MAR 2 3 2017 true vertical 9011 feet Packer true vertical 8594 feet ,A0GCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"x 30" 49-129 49-129 Surface 2665 13-3/8"72#L-80 48-2713 48-2688 4930 2670 Intermediate See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 12613-12678 feet 14309-14341 feet 14341-14342 feet 14342-14374 feet 14551-14761 feet 14811-15471 feet True vertical depth: 9007-9009 feet feet 8997-8996 feet 8996-8996 feet 8996-8995 feet 8996-8994 feet 8994-8996 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 43-11296 43-8692 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: SEAMED APR 1 8 2017 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 222 769 2360 1627 191 Subsequent to operation: 231 741 2520 1700 202 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations fff Exploratory ❑ Development IZ Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil I1 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature Phone +1 907 564 4424 Date 3/22/17 Form 10-404 Revised 5/2015 V TL 3/2 D l l , ZS r R®®�AS 0. � 2017 Submit Original Only • • m o 0 0 0 0 0 (a c0 v to� r- co � 0o LO C N LC) to U O o 0 0 0 0 i co 'sr N- d- Com) CO 7 O N CO N V Cb 0 O M () Cr) CO t() CO N N O N CO N. CO CO O O N to LC) CO C) CO 1 1 1 1 1 1 i H CON.- CO 0) CO CO 0) V CO 00 N:t O N- CO V N IC) CO •cp CU 1 I 1 I 1 1 Z rn Cb o a = m 00 CO O O C'7 >- . 2 L LM LU O O CO CO Co 0▪ _ = J 0b CO e.) M y▪ M N X *k O CO co a 0) 0COC � N - - N I N- to - NN O t_ I,- r3)O CO N- co crCO C co co N- co CO IC) C J N CO �t W W En 0 — — .(7) U U W UJ Z c w W w w O D H H Z Z ou) ZZJJH • • Packers and SSV's Attachment PRUDHOE BAY UNIT R-16A SW Name Type MD TVD Depscription R-16A PACKER 6820.06 5753.79 7" Baker ZXP Packer R-16A TBG PACKER 11176.81 8594 4-1/2" HES TNT Perm Packer , • • C u_ -5 a 0 Q O Y N .0 © 0 .- = 0 _c M 0 O C a) U) (ra -a C -C (/) (0 a) as U_ — N C D O CO 05 O !a O C U p t ca Q a W (z E CO -c a a) Q �S a) C o r - Q 0 E O -0 m 0 0 m � ao � c+, Q CO ` _c Z rn E p U � n3 c w H U a) J ~ D ~ Y .- rn 3 -a O p E J H U o U o M to ca) 5 m - f) w rn p o v E 0 � � O Z a' -0 z O �' a) O O - co C C o I m a) O Ln �Y/ rn a� C- N O N Cr) LL ai o r' L U I- G � � 0 p 0 a) rn .a' w C a) d � E1 C oo a5 _ Q CO C N .= - ti C ai E a• O a) o = 0 = H CC on co c I- II 3 Qa � fa' .0 -c w 715 _1 r` * a) a = 3 � o W 11 U * LL icy C cA a) OQ Q om .- w a) > -o �- a(., O � � O Eo0 _� ..t -L. @� N cW c6 rnM o z o 4— vs r Q U fA O L Q m_ 7 Q J o :.- ± CD Et 0 Q � o_ mLo * 2 p5 0 4 5 * o 3 .sem ( L co J O a N L O ONS v _o0o `Cx � � � w a) 3Q O CoEC c O a N d M Q p 7 N as Q•� i m a) � > UN > Z I- 5 N Z 7 a) ›' c Q W O C U a) r (n rn= rn Q u) E o (n ao0 � @ pp a) Q U 22Lt 0 m o �a _J > � H * N- p W W m u) � c W CO w w > Q E cYi Q� eL O O iso 2 � > a ANLL Qp °J° : o ° '= 0 0- : : O. 0 co * r- co > _ L) N- _d 0O Z (n I� C La-) O y I� CC m .- M a. a) 0 fn � N2d cj >' a3 O a — - �p H 4 N E w J } 0 Et - o - E O U L v M • N Aa a) � 0 � � any Lop Lt O NH N * t 0 2 N 'al Y C O rs. �' d N d 'Q a rn W' p •O d U - •3 O U) p C a) Q (n Z 10 U O V t6 �- m a) 70Q coo O0 WLUo wf- N- ai (� cco Cc < O0 Cv C 0 L C C ao 0 C O r� W W io U u_ O Z O r� 0 - H L r- O a - +• \ > N - M Z Z w .- > p .- a) .- > N m M 0 M OU 0U CO ` J x (n F- x J a) OL O a) U N a O a) O co C N U a) a) o O) Q) , C *•k CC CC 7- Q-a Q J N d7 Z Z N I- J * - II .� * 7 a3 't U � U0a E = WZco00Zow1.uj0 > _ 0 00 � _, 0 a) ~ ,a) NI-___ C U U > Q in N O.. _0 Y = d M = O -4 * H O O u_ * Cf � * * mo i p * U -, H H : H 0 -0 E 0_.4-- 0• W H 0 0 0 0 0 0 0 ~ co--- v ) 0 0 N N N N N N N P A— r- X— X— N N N 0 Q . ` . . C G A £ ee £ # ,- g g \ \ D O = t .- / § Cl Z c CD § / § c CD \ k ? g 2 ._ _ - g --E. - o 0@ Y .2.E @ a .2.R \ t o o / n + o f 0-ƒ ± y R o = E o = - cam • . ' 2s_ = « a _ .0 o R , _ .g 2 e e= . � kG \ 0 \ b \ RICA - p © - E » _ w -- E •/2 / •c m / § oO \ \ E / R \ / 2E \ @ = o W _ Elea-4. �- E CL § / = ao - en nro - mea o & a 2CNI © 0 2 3 3 e & e / \ H / 2- / / \ » ) & » 2 2 � 3\ \ 22 & \\ % 2 3w % E e 7 - E a * 9- E E - _ E % E o CDL \ '/ / � E / '/ \ / \ . E '/ ® � � � 0. - 2 o / e2 = f e7e = o & a n ® � 2 � kap\ 2 & \ k2 �2 \ k \ / _\ � ^ S@ \ f 6 G ( S@ \ E m S .4 3 u . � ƒ NoPEN ƒ \ / 2 / ƒ \ 7 \ 1.1 $ a ® e » ® % C)- C-3' \ 2 = tW E LOU) 0 / E LOU) \ E % � i � \ _/f \ co : L CNi / _/7 0 / / k Et O 0 2 \ O \ , o \ % o \ / >NW : \ ( �/ Cr) 9 & g § � / CO = _ / - ; t # ® 2 -- # q t t k ® - c t t # . C = Cu _ = c o = = o o = _ o c * .g / $ = o _ ± - = o P / \ 2 �7 7 7 2 ' .- � 0 e 0 ,_ I ® R t t � ) \ � � w - § % C \ / / ( � / / % / J G < c.g -C ® CD 0)C .§ � t o r f c r � ) » a t o f 0 & t o » a t e 2 2 o » _ t 3 I k » _ % c _J - » m A e o o = •- 2 o G e o o - / G O O E ' .. E e O » E = m '- E o , » E = m , o E O O E b E £ » t .o = a = aEa / t .o = a = cs # c = I oda o o _ e 0 = o ,- . = m o .g IT ._ ® © # o c 2 7 / f \ c ® 2 o 7 * f 2 0)\ / C * / % k f / ® d \ f f $ ? - R o - % E f 0 G + o - \ \_c R o - \ \ 2 2@ 0 2 • $ 2 & 3 .- 0 e » m w o : 0 -3 2 m co o : 0 - CC - — ± t O -1 Ct t I U O co W w w w w \ \ \ \ / $ ,- \ / N A CO # I (N A CO r N (N t e & & R & TREE V OW • _ WELLFEAD= MCEVOY ACTUATOR= BAKERC R-1 OLs:19.4"(a) L. 11531 ANGLE1' GtfiOMETBGB LNR MAX OKB.ELEV= 50.65' REF ELEV= 65.85' h:x, 4 1"'`'' i;:i";:. 2018' —14-1/2"HES X NP,D=3.813" BF.ELEV= 22.45' 11. , , 11 KOP= 20CXY `' : 1' Max Angie= 98°@ 12004' 9-5/8'CSG — 2103' •,►y ti 1, Datum MD= 11512' STUB(2/8/16) •ice/'` • A�� 2609' H9-5/8"DV FKR Datum ND= 8800'SS �• � GAS UFT MANDRELS 13-3/8"CSG,72#,L-80 BUTT,D=12.347" H 2701' , ST MD ND DEV TY FE VLV LATCH PORT DATE 6 3910 3718 45 KGB-2 DOME BK 16 08/26/16 Minimum ID = 3.725" @ 11280' 5 6423 5504 49 KGB-2 DOME BK 16 08/26/16 4'112" HES XN NIPPLE j 4 8278 6505 64 KGB-2 DMY BK 0 02/28/16 ▪ 3 9513 7238 38 KGB-2 DOME BK 16 08/26/16 2 10293 7870 36 KGB-2 DMY BK 0 02/28/16 TOP OF 7"LNR — 6809' I. 1 11073 8508 34 KGB-2 SO BK 26 08/26/16 1, _ 6809' —9-5/8"X 7"BKR HRD-E ZXPN LW w/BKR H 9-5/8"WPSTOCK(01/18/16) - 6990' FLEXLOCK HGR,ID=6.180" 9-5/8"CSG,47#,L-80 BUTT,ID=8.681" -- —6990' , MILLOUT WINDOW(R-16A) 6990'-7007' 7"TOG(02/02/16) H —10456' 1 4 1 11149' —4-1/2"HES X NP,D=3.813" 1• ;$4. �A �� 11177' H7"X 4-112"HES TNT PKR,D=3.856" 1 .; • • Schwartz, Guy L (DOA) From: Schwartz, Guy L(DOA) Sent: Thursday, February 04, 2016 4:00 PM To: 'Sperry, Nathan' Cc: Quick, Michael J (DOA); Lastufka,Joseph N; Roach, Frank Subject: RE: R-16A Change of Scope p-ip 2 ( C.- (gK Nathan, You have verbal APPROVAL to proceed with the proposed plan as stated below. Please submit a 10-403 sundry as soon as possible with 1)alter casing and 2)change approved program boxes checked. Also,function/pressure test BOP as well as body test in step 12 below. Assume you will be changing the upper ram back to VBR rams(from 7") so would need to be tested anyway. Regards, Guy Schwartz Sr. Petroleum Engineer AOGCC SCANNED FEB 0 82017, 907-301-4533 cell 907-793-1226 office CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Guy Schwartz at(907-793-1226)or(Guy.schwartz@alaska.gov). From: Sperry, Nathan [mailto:Nathan.Sperry@bp.com] Sent: Thursday, February 04, 2016 3:31 PM To: Schwartz, Guy L(DOA) Cc: Quick, Michael 3 (DOA); Lastufka, Joseph N; Roach, Frank Subject: R-16A Change of Scope Guy, Here is our current proposed plan forward on R-16A. 1. E-line run USIT from 2850' to surface looking for TOC. (in progress) 2. E-line run 7" HES EZ Drill Plug and set in second full joint below TOL. If E-Line is unable to reach plug setting depth, run on drillpipe and displace to seawater. 3. Change upper rams from 2-7/8"x 5"VBR to 9-5/8" fixed rams and test with 9-5/8"test joint. 4. Run Baker 9-5/8" cut assembly. Cut 9-5/8"casing at depth determined by the USIT results. 5. Circulate arctic pack out of OA. POOH and lay down cutter BHA. 6. Back out lockdown screws, Spear and recover 9-5/8"casing. 7. CONTINGENCY: Run 13-3/8" cleanout assembly and polish 9-5/8" stub if the cut joint does not indicate a clean cut. 8. Change upper rams from 9-5/8"fixed rams to 7"fixed rams and test with a 7" test joint. 9. Run 7"26# L-80 VT HC tie-back assembly. Once on bottom, displace 10.7 ppg LSND to 8.5 ppg seawater. 10. Pump 420 15.8ppg class G cement to surface(includes 40bbls excess). 11. Slack off 7" into the tie back extension. 1 12. Split stack and set slips. Ins all packoff and NU stack. Pressure test br.and packoff to 250 psi low, 3,500 psi high. 13. MU 6-1/8" build assembly. RIH. Displace 8.5 ppg seawater to 8.6#FloPro. 14. Drill up the float and EZ drill plug. Drill to w/in 15' of shoe and perform 7" integrity test as per well program. (Back on original PTD program) I've attached a `current' schematic showing the status today and a proposed final schematic with the 7"tieback and the 4-1/2" tubing installed. Regards, Nathan Sperry Drilling Engineer 907-268-8416 From: Lastufka,Joseph N Sent:Thursday, February 04, 2016 2:26 PM To: Sperry, Nathan Cc: Quick, Michael 3 (DOA) Subject: FW: R-16A Change of Scope Guy's replacement when he leaves... From: Schwartz, Guy L(DOA) [mailto:guy.schwartz©alaska.gov] Sent:Thursday, February 04, 2016 2:23 PM To: Lastufka,Joseph N Cc: Quick, Michael J (DOA) Subject: RE: R-16A Change of Scope Please keep mike in loop . I am leaving for vacation tonight for a week. Guy Schwartz Sr. Petroleum Engineer AOGCC 907-301-4533 cell 907-793-1226 office CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Guy Schwartz at (907-793-1226) or(Guy.schwartz@alaska.gov). From: Lastufka,Joseph N [mailto:Joseph.Lastufka@bp.com] Sent:Thursday, February 04, 2016 2:15 PM To: Schwartz, Guy L(DOA) Subject: RN: R-16A Change of Scope Guy, FYI! Thanks, 2 + • • Joe From: Sperry, Nathan Sent:Thursday, February 04, 2016 10:36 AM To: Loepp, Victoria T(DOA) (victoria.loepp@ alaska.gov) Cc: Lastufka,Joseph N Subject: R-16A Change of Scope Hi Victoria, Parker 273 is on R-16A.We drilled our intermediate and successfully cemented it.We set our liner top packer and the system failed a pressure test.We ran in with an KITS and identified that the leak is in the 9-5/8"above 1500'. We are currently running a USIT to find the TOC in the 9-5/8".We are proposing to cut and pull the 9-5/8" and then run a fully cemented 7"tieback from the 7"TOL at-6800'to surface. Will you please reply as soon as you can to let us know if we need to submit a 10-403 for this change? Regards, Nathan Sperry Drilling Engineer 907-268-8416 3 NOTES:CEMENT SHEATH COVERS TBG TAIL. 4'CMI WEllF6AD= MCEVOY • R-1 6A 112"CHROME TUBING'" ACTUATOR= BAKER OKB.ELEV= 50.7 BF.Ei.EV= 22.45' - - KOP= 2000' Confirmed leak • IY6x Angle= 51"@ 6700' above 1500' Datum MD= 11338' Estimated TOC in OA-2200' MD DetumTVD= 8800'SS 4 with Arctic Pack to surface 2808' —19-518"DV R(R -`` # 13-3/8"CSG,725,L-80 BUTT.ID=12.34T H 2701' TOL 6,809'MD •FEE:: :8 TOC 10,45E '' "'26#L-80 to 11,456'MD TOW 6990'-7007' TOC at 10,400' \' 10600' —TOP OF CEMENTEstimated TOC- 10,479'MD/8195' TVD • /'/ 10642' H4-1/2'PKR NP,ID=3.813" Base DPZ1 -6778' MD/5670' TVD ' .. Top DPZ3- 11,271' MD/8752'TVD $ �� 10653' —TNVANCHOR LATCH ASSY,D=3.976' •• .+4 10654' ...-19-5/8"X 4-112"TNV hBBRR PKR D=4.0" TOP OFT LNR H 10702' v • 4 10706' —14-112'PKR SWS NP,D=3.813' 1 : ,' -� 10726' —4-1/2'R(R SWN NIP./&LED TO 3.60"(12/05/97) 0 • a is H4-10"PKR VVLEG,ID=3.958" 4-1/2'113G,12.65,13CR-801DS, —{ 10738' sl • .1 10724' H ELMOTTLOGO07/14/94 .0152 bpf,ID=3.958" 41 - t 4 10940' H TOP OF SAND(TAGGED 08/09/15) 9-5/8"CSG,47#,L-80 BURT,D=8.681" -I 11233' 1-411 4:-...)---L ` MILLED 3.3"HOLE THRU RESTRICTION 4 FROM 11231'CTM TO 11242'CTM(05/25/12) PERFORATION SUMOARRY 11301' H MARKER JOINT RE'LOG:SWS-BHCS ON 01/31/82 I ANGLEATTOP PERE 45°@ 11278' 11332'ELMD —IESTCE�BITCAP(11/29111} Note:Refer to Roduction DB for historical pert data iii -AIN;.. S¢E SPF 0ITE VAL Opn/Sgz DATE MILLED 3.3'HOLE FROM 11388'-11382'CTM 3-3/8" 6 11278-11332 0 10/06/93 &C/OUT SAND TO 11466'CTD(5125112) 3-3/8" 6 '11444-11484 0 10/28/91 2" 4 11484-11502 0 05/13/83 2" 4 '11512-11534 05/13/83 1147W H FISH-2 BLADES FROM AWS 'P'ERFs BELOW MILLED CMT CAP FULLBORE SPINNER-06/15/94 Ilk4 11727' —FISH-T BOT PROD PKR VV/TALPPE, PF1310ITD — 11975' AFPROX.89'LONG,10/19/91 d ' 11975' JH FISH-38'x 2-1/8"PER GUN 8 AUX TOOLS-04/29/88 7"LNR,265,L-80 BUTT,.0383 bpf,13=8.276" I—I 12Z80• 1-410 DATE REV BY CO10.43(1S DATE REV BY COMBOS PRUCHOE BAY UNIT 02/07/82 N18E ORIGINAL COMPLETION 05/20/15 JM) LW?DEPTH CORRECTION WELL: R-16 10125/91 0-16 liNVO 05/20/15 MG/PJC RES1RICIlOW SAND UPDATES PERMT No:x1811740 11/28/01 RN/TP PRIONS 09103/15 jgr pre-sidetrack P&A AR Pb: 50-029-20686-00 10/30/07 I]LB/PJC CRAVING CORRECTIONS 12/08/15 NS Amended P&A Cement Bottom SEC 32,T12N+,R12E,1659'FSL&1711'FM 12/16/11 F MI PJC SANG CMT CAP(11/28-29/11j 06/07/12 I&11JM0 FOO(05/25/12) _. BPExpbration(Alaska) .i • 'TREE= 4-1/8"5K H FLFAAAD= WCEVOY PROPAILD 6 NOTES: *'"4-1/2"CHROME LNR"' _ REV 3 ACTUATOR= R-1 V ------- OKE.T3EV= 50_T BF ELEV= 22.45' KOP 2000' Est. 9-5/8"stub at 2000' ��`-- i € 2100' H4-1/2"HES X 14113,D=3.813^ Max Angle= '@ ' +�+/♦ ,,,'i Datum MD= Datum TV D= 8800'SS )+ �-4, ' 2608' --i 9-5/8"DV RCR Z GAS LFND T M\ Ra.S 13-3/8"CSG,72#,L-80 BUTT,13=12.347" H 2701' Ii ST MD TVD DEV TYPE VLV LATCH PORT DATE 6 3720 1-1/2" 7 5 5496 1-1/2' 4 6502 1-1/2" 7"26#L-80 VT HC tieback cemented to surface 3 7241 1" 2 7879 1" 1 8510 1" ITOP OF7"LNC H 6608• 5608' —7"X 4-1/2"BOT HGR 9-5/8"VVI-LSTOCK( / /_.) —I 6990' I w/T1EBK,V= " 9-5/8"CSG,47#,L-80 BUTT,D=8.681" — "6990' MLLOUT WIP[M(R-16A) 6990'-7007' Jr' TOC(__ lJ --1 10,453' + 1�1 A 1 11043' H4-1/2'HES X NP,D=3.813" )4 )4 +4/ 01,,, t�i 11073' —17"X 4-1/2"HES TNT PKR,ID=3.856" •4 ,4 r4. �j 11103' 4-1/2"HES X NP,D=3.813" Minimum ID = 3.725" @ 11173' y 4-112" HES XN NIPPLE �� I 14 11 ,4 11173' —14-1/2'HES XN NP,ID=3.725" I )4 '4 44 4 11193' 7'X 4-1/2"BKR HRD-E ZXP LTP 4-1/2"TBG,12.6#,13-CR VA M TOP, 11193' ' '4 +/ 1 w/TRK,D=5.25' .0152 bpf,ID=3.958" i/- +/ f4;'' I 11193' `--I4-1/2"WLEG,D=3.958" • t4 1� 'o..i 11208' H7"X 4-1/2"HES HGR,D=4.32" .p. •.• 7"LNC,26#,L-80 VAM TOP HC, —11458' ri .0383 bpf,ID=6.276" r ' >+ :4,, "I/6, FERFORATDN SUMMARY .4 e ( Z REF LOG: on / i . .t''L7-t' ANGLE AT TOP PERF:_..."(.) �1 Note:Refer to Production DB for historical pert data 1 SIZE SR= INTERVAL Opn/Sqz DATE :4 ;>c itilli — 16887' %j►etettt} �1.4�444 4-1/2"TBG,12.6#,13-CR HYD 521, —15977' .0152 bpf,13=3.958" DATE REV BY COMMENTS DATE RB/BY COMMENTS PRUDHOE BAY UNIT 02107/82 N18E ORIGINAL COMPLETION VIELL R:16A 10/25/91 D-16 RIND FERMIT No: J / SI (R.16A) AR No_ 50-029-20686-0 19/24/15 JMD BUTT PROPOSE) SIR;32,T12N,R12E,1659'FSL&1711'FWL 09/25/15 JR/JM) PROPOSED REV 2 02/04/16 NS Updated with CEP and 7"tieback _— ,� BP Exploration(Alaska) • • Davies, Stephen F (DOA) From: Lastufka,Joseph N <Joseph.Lastufka@bp.com> Sent: Thursday, October 29, 2015 4:36 PM To: Davies, Stephen F (DOA) Subject: Typo on Cover letter Steve, I noticed a typo on the cover letter for a newly permitted well R-16A(PTD#215-185),that it was named R-15A. I hand corrected my copy. Please let me know if you have any questions or need additional information. Thank you, Joe Lastufka Information and Data Controller Cell: (907) 227-84961 Office: (907) 564-4091 BP Exploration AlaskaI900 E. Benson Blvd.'Room: 788D'Anchorage,AK SCANNED FEE t S21! • • o O • O o N o Z 0) N C C c) Z co 0 0 o = o) U03 rn >1 a m ca OI a)I o o o — c m 0 m m u) w E (,' E aZi a in 0 th ni 01 *u. c „, C9 C0 -o t •o .c -o c co cn g �` - C Z O Z E Z`- Z Z N Z N Z 00 Z°d Z Z 1 O Z �' E•c O� OL Oo Oo Oo Oo Oo Oo 0 0c Z = m0 (7 .1: (7) &5>0> (0> (0 (O Filo (7)0 2 c Q m III c N Se 55 >O >> >> > > >> >� >� > > NI .0 10 10 1-1 IJ I-1 1-' 1-1 1-1 1I 1 m w c 0 < < > < 1 < 1 < 1 < 1 < 1 < 1 < < — 0 0 _g co j co_, co t co t cc co t co t co t co m o o = 0v � 1 I ,- ce ' fy ' w ' ct 'T' ' w ' � L Z J O ry+'. m & 2 th 2 t c1 t cI t cI th cI th c1 d' cl th m ct m• t cn O O 0 0 C�m O m I a) I a)�•? a)Lo a) U? a)u) a) u) a)co m m a) m a) 1 - a)'0 0 LL C LL C LL W LL LL LL W LL LL I.L 0 6: 0 a:i 0 Z 0a E �W .0 c.,1 'oN 'o gw c � o � .Uf0 oco o. . oaQ CO7 w ,'c1rn c c c s •E .> •C .5 .5cc N .cN 'E" CO 0 Ol o o m 01 001 o= 0N O m '..7. N on, O o O a '.7. a 058) C.), Q CO -JJ V 0 2 :° .t-. >. o >. c•� ..N o 'm r° o Z o Z . E c E c Q -J I a) a) CO _N m _N m _N O a) 0 a) 0 a) 0 a) a) a) 0 a) O 0 O a)O N IX Q EO W(o 0 W oc W oc ED oc W cc W cc ED cc W In W co W U W U W l'o O Z _ _ _ _ _ _ _ _ _ _ _ _ Q. 0 U c "0 co co O co co co m co co co co co Y > O O O O O O O O O O O O W d N N N N N N N N N N CN N m V V V V V 'Cr V V V V V e in in En in in in in Cn UD UD cc 0 J coy, a W w _J _ U m o O � 'CC o a o oo o co o a) ZI c rc 0- O co CO coo O E4:14 E a) () c-.1-4 U @ M c o Q Z i coa)113 r Z Co O 0 S Z J r2 GM CO CT) N W Q NZ O CD c m N W J W O a) 0 �/� m O V/ 0 O 111 Z a 0. 0. 0 I oc a z Z 0 O 0 o 0 E J CO 2 Z 2 mm m m CO CO CO CO CO CO CO CO a) a) m m m m as m m CO CO CO CO CO O C E O 0 0 0 0 0 0 0 0 0 0 0 co 7 rn Zs m co co m m co m m m m co y CA o) CT CT _O) o) o) OA _O o) O_) CT 0 Z 0 y ` 0 a O 0 0 0 O 0 0 0 0 0 10J L m a) CA O CA CA CA CA CA CA CA CD CA CA F 0 d 0 w E O O O _O O O O O O O O O Ol) Q Z .0 d m 3 r 1` 1` 1` 1` t` f` ` r t 1` I-- N 2 0 Q O W o z N N N N N N N N N N N N re ° 1-;:i E LL m o co O �_ Z W o 02 '0 0 0 0 0 0 0 0 0 0 0 CJ cU7 E 5 a a) J O m 0 ° ' 1- a =y 0):4 c. 0 0 O 0 0 0 0 0 0 0 0 0 0. re : o I— 3 -101-' w w w w W W w w w w w w • • o ci N O a 0I I -o • W 0 0 0 N ZT NZI2 •coI O C • a a ti( coI O D 0I0I 0 co J rn J to 1n f- 'O To th ") J 0-o w J .N."ci LL I p I I o c H co I coo w I co o Z c c o c c C7 a E ° E 0 E ° E,3 o co o 0 0 0 d NI ,)I J ,01 ,01 0 Q W m 0 I U-o U I U 10 a l01 c Q CO •i IN to I� Io li v co) o o c i ccoo w - 0) m (Qo o m Z .E .Z .E 2 O a� o o o J , s) Q. co I m 0) th Q) LL EL 2 w2- cLm fiU1 ce8 &co1 • p cn t, cn-o co CO-0 0hi D E Z `- it ZI O) LL ZI LLZI LT-: O) it LL Z 0V it LL LL0 LL C w o�J o� � 0O o c)�J a X _o LLo� oO 02l o~I oil ~1 a) c I c E E I c o c E c E E E E c E c E M m o5l-c o�1w1 2SIJ o> . o-o 2 w0 2—' 2N oN oo oo E I— a UQ O U .'T' UQ V a o V Q U t!7Q V a ;>`-' O) U m U O) U ✓ p N J CD °'(o< u, °' cfl G) o co� o cfl o W o co 0 0 0 0 0 0 0 0 li a W "TN_ c W 'o W I W W NM W W J '1_1 W J M ..., 0 ` L d o 0 0 0 0 0 0 0 0 0 0 o Ern E LU N N NN N N N N NN N C6 7 V O O O O O N Z Ce O N N N N N a I LO (� co co co co co w (..- LU o.e J N V 0. m 9 V Z d Q wN 0 ..U0) 00 1 m co 01 J Q co O _ 0- U) ` S Co c co y G T o O O O N p � E U No M cp o Ja N Q to ct c c. I__ Ci 0 l'''' O ', Z _ Cl) 5 D N o /yG� Q N N ^W^ m N C ♦�../ O t co v/ p p co Qa• c ° I— °' Q o a C) .d O co 0 E co co Z U f0 co co co co co N co co co c0 co 41 co co co co to W "o co co co co co 0 '0 0 0 0 0 co N 0 0 0 0 0 E O cs To To To To To 2 co co co co co 0 o) E) o) o) o) E>) 5) rn rn rn rn s rn s O 0 0 0 0 0 0 3 0 0 0 0 0 E 0 o in > 6) o) o) O) o) d) O) O O O O O .2 w ea I— O O O O O O O co co M co M c ' c() r N- r r r r r r r r N w c N N N N N N N N N N N N N TxW N N Et E E Z F.` Z O p Lo in co Q o cU 0 0 0 0 0 0 0 0 0 0 0 0 `o 2 C07 0 O • 0 0 0 0 0 0 0 o) wwwww 3 Za 2 w w w w w w � • • 9 O W.. N O < < < coco Z Z Z N v o 0to >- >- >-0 N V) T cv 7) 9 5L >. 'i. .p o in m c �( w co Q a L a o Z i Z .c 2 I. U a c` ai Q m 2 a ' U U V O % Z Q Q Q 0 Z Z co a >- >- ›- I co � r J U m co 0 Lf a0 N p ii O Q 7 Tco W ix o °' a it E wK a) m Ww..J m C) U 0. m Q E 3 E Z :? CD CO cn t6 co J a co .J O ... 2 U U I a � C 2o 0 i ON a E Q H / V� p z .+ en N U d o J >- >- E M < C N < co I to 0 0 W co 11111 Z m o �• ' 5 o m c 1 oi G N CO ` COQ CV , w E W m N O 1- E O m c U a) COC) co V/ D p c ' p �IIG ICCag c •CO a ) I— 0 n g m O Q z Ea a _T Ii U - co - 0 CO I z d m Ln M• o < o 0 z N N I CZ C) N CO 0 } } } N O C to > p � m co r I-- f0 1 M a E 0 1 0) p fA 0 N r• c N = .5 C) a• u) W m .. K 0 W c ~ co c 0 0 O Ill V .p+ O p < O 0 C c U J 'y a� a C) C) N U n o a a E a O £ o E o p .c E °) d E E 4 a 2 U a 0 0 U a G 0 0 2,15- t 'OS bp • • Date: 06/20/2016 T27-3-30 Transmittal Number: 93510 BPXA WELL DATA TRANSMITTAL RECEIVED Enclosed are the materials listed below. JUN 2 02+016 If you have any questions, please contact Merion Kendall at the PDC: 907-564-5216;AOGCC merion.kendall@bp.com; gancpdc@bp.com or Joe Lastufka 564-4091. SW Name API Date Company Description • PDCL Composite Log Print-MD • PDCL Composite Log Print-TVDSS R-16A 50-029-20686-01 6/13/2016 BPXA • CD containing digital log data (AS2f __gPlease Sign and Retu one copy of this transmittal to gancpdc@bp.com Thank You, \ 1l erion Xendall Petrotechnical Data Center Attn: State of Alaska - AOGCC Attn: Meredith Guhl 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99507 Petrotechnical Data Center LR2-1 900 E. Benson Blvd. PO Box 196612 Anchorage,AK 99519-6612 i r Link, Liz M (DOA) From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Tuesday, May 10, 2016 4:15 PM To: AOGCC Reporting (DOA sponsored) Subject: PBU R-16A/ PTD # 215-185 Hello, Please reference the following well: Well Name: PBU R-16A Permit#: 215-185 API #: 50-029-20686-01-00 Date of Test: 5/7/16 Type of Test: IPT (Initial Production Test) Choke Size: 96 Choke Unit: Production Method: Gas Lift Duration (Hours Tested): 8 Top Reference (Top Perf MD): 14581' Bottom Reference (Bottom Perf MD): 15501' Tubing Flowing (Pressure): 537 Casing Pressure: 1384 Total Test Rate (0, G, W): 1296/ 879 / 83 24-Hour Rate (0, G, W): 3887/2638 / 248 Gravity (Oil, API): 24.5 GOR (Gas-Oil Ratio): 679 This well began Production on Method of Operations on this date: May 7, 2016 1 RBDMS vk MM 1 1 2016 21 51 85 RECSvED 27 1 09 Schlumbergerm" 0 4 2016 Transmittal#: 04MAY16-SPO1 1�n�� , Drilling & Measurements DATA LOGGED fMWD/LWD Log Product Delivery 5 itni2o1G M K.BENDER Customer: BP Exploration Alaska Inc Dispatched To: Makana Bender Well No: R-16A Date Dispatched: 4-May-16 APIN: 50-029-20686-01-00 Dispatched By: Stephanie Pacillo Well/ Product Hardcopy Digital Copy E-Delivery Date Delivered To: AOGCC Makana Bender 7 Total Contents on CD N/A Color Log Prints: 5 VISION*Services 2" MD x x VISION*Services 2'TVDSS x x VISION*Services 5"MD Quadrant Density x x VISION*Services 5"MD x x VISION*Services 5"TVDSS x x Digital Data N/A Contents on CD x Survey 1 Contents on CD ASP Final Survey x x EOW CD 1 Contents on CD Graphics:PDF x Data:DLIS/ASCII x Survey:PDF,XLS x • Please sign and email a copy to: Please sign and email a copy to: AlaskaPTSPrintCenter(a�slb.com gancpdc(a�bp.com Alaska PTS Print Center ATTN: Merion Kendall MAL01-420...)17)Received By: 6,61, III III OD Q7 4°88822 R1,748422 82^ 8422n82^°7r AMmOWPoDN28t3mmWr6cO "P828 P82 8 N0 ' OOWp rnArWW 1345$m asNro aNmWP82 20i$2n mO WC NNNNN NNNNN NNNNN NNN OOO p0 O aMN� O OO 0000 OOOO pp0O0 O m O 00000 00000 0000 00000 00000 OOO 0 M J OOOOO MOM00 OOOOO 000M0 OOOOO 00000 OOOOO OOOOO O a in W OC 00 W W W 666 66000 66 W 0 W N 0046 6 W W W W W 66666 N 00 N OJ 6 ‘w". 06 aaeaa ,Q-t aaaaa aaaaa aeaee aaaQ' Qaaaa a 2 V-- 0-,,,N. W n N n a 01F.-,V, m 0 0 N 0 W OWN O .0,0-,-N .0.0 M V N.C6 A A W.A A .0E -t,"3N'vo c4Nr7O� w0"222 IW.4`4O40Omr7 nln.IOmpl42 OWnW t0 r nnnAn AAAA W W W W W W W 401040n We-l•Ja v7 iDW A WO N n W07 O 7(j N N 00 W pWp aWa yWy R W W QWQ aW�}W W W W W aWa pWp W yWy W yWy aWa yW yW aWa QW QWR QWQ�0�{..... ..... a0a WWWWW aWa 00a yW (Q J O m AA A OO M AA OOOOf�'J A AA AA fOOO f0O AA mOO OOOOO f0O M f• A O '- 666666Io'6 6 0 00 0 0 0 0hhh, 0 0 0 0 0 6 6 6^6 ^6 0 0 0 0 0 0 0 0 0 0 0 0 0rhhh, o N M p aa}} (pO 02 0 OI-oW Wd6 OWOwoco0 VMNAW (N W 1(OWOW W.-WVo t.DOWMM 10 ANN.- 11WJ C?O O O W N�R�Ra�a a�a0R0 Ulla; (p�N(yM�MfpM faM fa7 In ANO�Op ��p TpOp)N�[) W Noo - I�NtO'-f0 Q V W M W W Ef0 f0(000 f MIO � 1 O I O O f h f f O f h.7 F Ml5M g 0.0 0 0 N N m th [y q w chi l�c�i l•oi c� cmc mmm0 mmm m l•mi cv'77�i chi chi l+,m rm mmmm mmmmm i3mmmm (00000 00000 00000 00000 00000 00000 W W W W t 0 000.0 0 C N a a a O M M O N M WW `r m M ur7 0 W-‘00),V O 11A'7 7 N e.-.-000.OD ..0 .f 7 W V.-N A LL'J V M M N N N LO..... .- OCJ6 6 n 10 h OD(p W W.- 4r -4. NN 6WW OQWW O Y a a a a a e v a a m m m m m m O m l7 a a 10 W W n n n W W W mom.. N N m NN N N N N N N O WOO... W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W Z A r A n A A A r n A r n n r n n n n A A A AAA A ',AAA, r r n n n ,,,N-, A 6 00 00. 00000 W000007 W N 0 0 M0000 00000 W 0000 WN00060 0 ( 0010 .00 X¢00<NMpOO0NO,-v (qV[ NAAOmppNWxNMJOMN 00MW. OO ND ANO OMO V 0 OZ 0000 00000 00000 00 N N.- 6-,.- - N N N N N O m . 6666 6 X0000 .-NOOMN0 '?0:..r.-0MN ,-06,-MM 7r .-C600%-0 °° V r'- 03` OOWMN mWa W01( O0 , 7O 6,-N4OV(N NNV 6 WV. 0 WW 0WO.0oi6NNNM0 ! 0O^ rDaOO L CO L W p y .06.9.1.0%- '0 Z'r00000 W N00OM10 N 7O W V ON V O W NM W0 V N NNO n,- W 00., 47 W 6 "g 00000 90007 N M a Q.n .c549 ..4 N WN T M gMD 7Q QN 0 0m n W Q Cn mW v.- ,_ _1 OJJ co N W Z 0-6 0000naA couo MOMAWNN m0! OAAOmN0VAW QO WW0 D 0 " D> > C NNpppF U F N N ..... N(7 Q W W D D I T VO0Wr0W .- v-....... MOWx- 0 OnW W00N ^ O o M O OpVU r rwEor==oOOD" 'NoON 0WopONO 0 8 0 XN20000d Q500O6NTONNU20 :am.wW. o00amFo.-3 �0pp }} p a {p . `X00000 01�00i0.-07 ONO V O 6o6. W,-0-10 O,V 0.00 NN40tND W V N,-N O 0.000p r V Y Q 66606 ��A N N Q 10 W A W W W�'N m0.., N W OOOO M M 666.-h VV..0 W O 0 yr .t Z c O cC. i Q B t g 0 o v7-,. 'c 0. :4 5 c E rn ; N^ $ D N0 0....5.A..1.5 4 v d= ° o m W O C w p N O 1 C N O 07 u Z w .;-.000.0 m N 10 m mon.. 6 0V 0 n n m 01 n n 6 ,-(0,-060 ,-000,-0 W 10 07 n n 6 M V 00000=-L, - 04 %= . .m& W 00000 O7NOa MN010 W as W OA W 0N N a nm00 W 470 a A C-10010 O W y•- CO 47 W W 00000 79 °'-NN" NNa :W 000(0) W 6M 1::708Y,8 70 W Y,W A V:2g/ Oi f7 J U U N W d.5+p C O C r d!!C > • N Oh a W W W W W W A W W O O O O N N L N 0.rn `m,E+`w u 2 2 A u° u . c 88 IR d » . •-� a 2 Z C C 000 07 7. .1 T. rn UEn Y o A N '> > UoUofOSZ0J VfAN ONnNNNNNNrr ... .-.-7WOnWNWVa 0 06, WRC . OWN 000 0. 70 0.,WO 0` I- O6NW000yN5nnYN50YC .- G ( JO6WO WNWr 0a aON .-N ma0Wr W00.-' 0000. W0000 O. • MNWom,,,,..4.' � NNN NNNNN N NNN N N NNN N (V N 04 Qto"'.l N O1010 0000.V. QMN N ,-..-000, yMA W N W A W W000+7 N .,,COV O �W/ y'X W Wp.-MM MmmMOWmMM Mt. 000 07 On pal 0...0.-.406666 hh660 p.pa A0m0 W A W 6 W c12 601nN V V V a 6a V pp6a 66666 V 6 V V V Oh�100 r 00007 N000� V OWOONN NNO-MM CO F Nf�eSI ,08..- N N NNN N F4(74;7400 N NNN N N w N 0 li t • .-W . O a W --0..... 7fh OAr(mD10 �V�77�0�pp40�.m On W V,- Nt6DON m coc166m:p pMMO W?m:c46 1[a ROOW0 R0 CW r ��■■ 0Nyc,-:'' F 00040E 0OWmN Mf7'OA ON0r110'1 V,7vVv <aVV10 101010101E 10 10 10 10 10 •� 4n ` m N 14°00 g E NN N��� N� LSF V li _ W �7 6 W C M Q W CV U o NE ,w ci V m"w _ p0�o spa W V O O.%N N 0 C�00010f0 r77NMN fADrAON NN V.17 NtAO OtWO V WN NOM., rOM NMV 0 0 ON ?.W 5 N o 0 M OQ 00000 00000 00000 0 0 N(0 0 0 0 0 0 0 00,-,-N CO(<+)V V 00000 1n 5 m 0: N\ Q pO7�Op a W Oa0 N0 1 2 0 pQ NpQ m O p$A W lL m d R K 100 O:Ii Z Z Z O O N = DES N r N NN NNN NN NNNNNNNN NN NNN NN NNN NN NNN NN NNN NN o66 6 ��v ri 06606 vriv v 00666 v riv g 88 81:=71:2:281:=71:2:2v 'NWN'n yF�v4 e o O« O7 �N MVOWA 00070,-N MVO.' WOO y C� NNN NNNNN NNNN N NNNNN N K rn y o � u � c M E �> of :L,° O y J 2 i ut N �. .. N d ..0 r a LL U laD N ui Z O 2 C C m a C r ' c° .. muao° Ot7wuo E c o c v a « W a E m°1'm d 0,-a > > o °o 0 0 o 0 2'U IL N m Q W W f U J J U(7> 0 III III 00, pp n g pp y oD tD pN<p r 'O�Oon00 Ooop Aeoen�pmpt� N 0000. 0,0`,S NO2NO W �,3�n om0 0061000 $00000 QOM,/ I� (0(4.000 0000..-0' .-0,0 W N 0f7,0N 0 N W 0000 0000 00 0 00 (p (O.- p p 0 .-0, 00 m N 0 V 0, 00028 pm 200 r (-0.(00 W NW WWWWW 00,00 NA N N ,,,,, (00(0(080 (00(0p(00(080 .0.1�lA 0oO) pp p m O, O>W 0 W 0 W W W W 0j m m m m m m m m m Ori 0 000000 0 O>0 O>0 m m m m m m (0 J 0,,0,0,0, CO O O CO m 0.000 CO O00O CO O CO O CO 000 CO m 00000 COCOO COOO CO CO CO CO CO CO CO CO 00 W W W W W CO CO CO CO CO CO CO CO CO CO CO a NGD(OOD 66666 606666 666)66 66 666 66666 66666 66666 66666 66666 66666 66666 66666 W V V V V V V V e V e Q V V V V e e e V e V V V e V V V e e V e e e e V V V e V V V V V V V V V V V V V V V V 44444 VVVVV V 2 a W..MNrOV0per , Op °,N,OW W0NM MO (p ON7MNMN00 „N V,MOVW .-NrN M°-0eM. 0 .mW MO. ., r0 ry0W (pCiN.N ONO 00M„ 1oV 0 . a ((pp Npp „ 2T r0mMr. 0.-,.0, 0e.-mW r00V N r N.V. .0Wm2 NNMV. 000NM.,0,OnAN WW O02,0 _ WO NV,ONNNMCMVVOCy00 % 000yWVCIQWW2WW 220W22W00%t;t8WWWWWW WWWWW p00pT ;;mAm mmNmm mm mmh0m (p ONOy }AAA}} QMQAA NNANA QAMNA AAAAA yOOOO yNpNA 8AyORyNyAA aAANN ANAAA MRAAM N 0000 06666 6,s666 W 6006 66 666 06666 00000 66600 666(0`'6 66666 66666 66666 66666 660 0 N M LoCO,.- . WOCO .'NO COO�NO0yy CD,- 0ppANOWOWoVOn00, 00.-.- 0pV VNW COW0 WW ,M0, N0 .N .- 0Oco (0 CO W. 0cr,COM 17 q. V 0�rMW 4,,f22-A� ,,:mm. AWA0N80.' 8WWNO00�Npp0 .0O�N78 ,rW .- 000CO ,rrom m 6.-.- NN N .-N 00 1 0 m OOOW MMMM M20 022 �M§ r �NpMR OppppA mo0AA ( AAAM02m2Omm0mOOR0022MM MMOMMMM,MMM 02�0 ' M• + • + + + t ( + 0.00 .000. 00000 WWWWW 000.0 0 0 0 0 0 00000 WWWW 00000 00000 00000 0000 WWWWW 00000 00000 0 C08AAOOVN000106ONa42 .-0pp( Vp ONV� 0.-OaON.-O .-OmmAV N.M. M.- r NM20 Nmf .-6V 070 Vo6m6 wo0 .- m0M M GMCQV2WrANO, mGW(8pO.- 8RV0m 000aMNNN m .-NNOmWW WOV 0 0 r 01pNM666 MV60( ppO .- 044V 0( ,W 0M 0W1\ OA w-NNNN NNNNN NNNNN NN77M M 70 (7, 00OV CeVeV VV}}V V00 000 00000 00000 0 Z WWWW WWWWW O.WOW WWWWW WWWWW WWWWW OWWrr 00. 0PPWr W00W WWW0W WWWWW WWWWW W 2 2200000 °' 0° 00000 N0O00000 0N0m0mMOMMM 00,000, 0° 00 ° 00000 ° ° 000000 00 0 O2 0000 0. 00 010000v0. 0 000 000 00000 0000 0000 000 0000 00 J p0ppm W0404VOV 0000 °NOM0 0m8WNV,-NO ON(N0NNN0VV 000Ny9OmOV,0)W 0000 000M000.NN ) 0 O � 0W 000006 00600 0.-,�6N -SO4.-, NNNN.- .-.-.-170 7NNV4 NMM ,-N. MN NNNNO4 0)(064 (ONNMN X660 O 3 a00Nm V 8,Q4'8 0-6'828f1; W Nmmif) Or 2,742) P'7,'8W NNNNr2,',')82424 4nNNrm2882t; NN2r0 "N ;W N (5', 08WMOC O828g10 0 N NO O.. MOrNNNCV0, , 0C0 $ pM .-.- MmOO NN 0000 02pMa8VVVOVV 0.0000W0WO,rA. N NNNNN NNNNN NNNN7 MMm M.MmV Viu ( 00 000 W M EVIm W N OM, 0 0 W N.-(-0., [,-00 200m80MONOQ0V 0, NOm W V00.-0„ W V ^8 z MMV 00r07 01.00N 0,(0r 0 000 (70(0N (O 0, 70 10,r N W 0 (7 O 0 O.-.-.-N O467;66 ,,0OO .-NN000 NNMMcc0O .- NNNN000007,080V 0CWNN NN0000 000 7 .-VV eO CnCO In Mg.-NM �_thQco 0WWA0NppVV, -arNNW 2 W ,0V(0ONW 00 Vp0 0 } .7';,88'4 ONW40 6OMpo NV0077 NM0ANON7 00N7fi pNONN00N0VONN0 66666 040) N02A 0pp 00W00N00A MMNa1OOVVVOpp0O0000,, ,NANON0.0 NNN NNNNN NNNNN .M 7MM, V VV0 0 . 2 0000 00Ww00) m O a NNNNN (-pCJ a = pp7Wr07 000Mmm ° OV.-OP,. ...Mg.. 0,,0N, 0, rM�7MNVMp� 0 , 0,000.- N 0W000 (7. 0m - V60, 0,.. c14M1n .VO0QQ V00WV 04Mm V00^ 000-N . � 00•-WW2 00.-Nm ,. 00 000) Q.-NOV 08OVVO0NM.-NV. ,000.-M mW3NNNNN NNNNN MMMM707,. 7 VO CV00 00( 00OOOm C D T 00pp pppp p m O (WON,V On V AO W 00NOri NW N W.M-. 0,10100 N,-0,-0 N(MONN A 001.A00i W V .00071,0 m0404mr0 .7-,100 W N 0,00V M.N010 N (7 0 H 00.- rNOVm 0(6.- 000r N6066r: VNmrn myr6 66066 ,-01W(p WONV0 m.-VVr.' O(ONr 66664 m OVVO 000, W.mm0 O.-NNVV000 rWWmp 0177 68,m6 .-N.V. WOOS.- Na0nW ONM0 0000N M .- , N NNNNN NNNNN NNNNCOMM COMmV eeeee Vee00 ^ ommmmm 000,r r 772 V pp0.V. .. a 0000.- .-.-.-00 000)W m W 7(^000 OO AO.- 1717 ,(20,00, 0N(OON V CV O V NO M(000N(VO M00y W (8V 101.(),2 M(000000N 10 0.-000.- eir. 60i00.- yojm4y 66666 ~ 0 M .-00 000DoN r-V . 0 ,, NWWm WVO00w. 0., m2000 $ M , mmmgggMM 666 Mm6r , 3 mNNNN NNNNN NNNNN NNNNN NNNNN MM yy26 , „0 % Np10NNp0N �p00 w0W 7 ,-M V 0 O ,W 017 ,MON V r,V OmmNV NN0rV W V.- N NNN00070 170VMfOCn 00O nOOO V(0OO VON 0 °66,6. 46,i66 0AmmriWOWOAONWmeim pVV00,Om 6666O OWNr. c.i60H6602Oeee 0606^0 NW04WW A0OmW 988 8 mmmC ` MNONOMM5yyic0" el " ( V NNNN NNNNN NNNNN NNNNN NNNNN NN m oMMM MMMM 70, MA WWWW,,, N, OA00VphONmNnC .- .-.-010C 000V0ON.-0, GO0MWWW 777770Oo0pO`..WeO0 p1yo7OIm (7.- .0 00, 10 0 ( 0 10 LL9V O7 00 H500 2280 2W0,M nnppp VVVVV VVVeV 4008p0 MM80h 00008 00022 MW000 yaaa0 OOONO N Eyy Q 17r0"0.888 NNV00 rNV S 4 188,%22 0(,02 NnM W F28,".1.T.2 O"N,r28-28 CC:',00282'f2 :7.'20'58 tO0N 00 822,74 WW(04 V 0000 00000 010001,: rWWmm 000 NNMN. OrrWm epM m7pM7778800 OVVVVVNNNNN NNNNN NNNNN N7MM MM „ 7070V VVV 0=0000 00000 O p 0 0 0 00000 00000 00000 OOOOO 00000 OOOOO 00000 00000 00000 OOOOO O 2NNNN NNNNN NNNNN NNNNN NNNNN NNNN N NNNNN NNNNN NNNN N NN NNN( NN NNNNNNNNN N NNNNN N 0000 04060 4 (-040 ri0404p00 pC p 0602�� 2gW2AeNN �wOWmsVp0000MMvMm 7A82VNNy00020p ,8M7pW, V0200 O a0 66666 0 Vn rotc �n MOm mmmNNNN NNNNN NNNNN NNNNN NNN 2(700 MM19(7 (7 (7 7(7(717(7 (7,,,7 7M M M M e e a lii CD M • M N N _U g C O W M E kc E m o U 0 XM �{pp p Q �fpp�fpp �p R p pp Q(p pp 00v 0 .0..•0N0O N0.-0OO OvfhAO W 0�A� m0 W Av 0ONi(N O0N0N mN000 aAD,00vOM v000, OOmiCO� A}O�Qmf+) ANAN, N0MMN Ori 0 W ONO V M V NpO W {mp W Ov0 AOON CnD On l+ mv0 O W wVN 0x000 NOON V 00App 2{p0MNO O�nmeth o W ntn QN0' N (O N� O� O f A W 0Q m O W r m N A. 0 In 000 00000 til pm 0 0 0 0 0 0 0m N-W W O °m o m M M M M 0 M.0 0 T m o m.° 0 0 0 0 0 N00 0 0 0 0 0 0 0 0 m m O 00000 Om>Om,0 Om>0 ..... 0 g0;RP,0 ...m W 0 0 00W 0 0 n O J .0000m m T T T W W W W W W W W W W W W W ...cow W W W W W W W OWD W d W of W 6 W W W W W wow..W W W W W W W W W W W W W W W W W W W W W W W 00.0. WWt6W 44444 44444 44444 44444 a 4444 OD6J444 44444 vvevy Tr4.44 o eaoer4m 44444 44444 eeee eeeee eeeee eeeee eeeee eeeee Qeeee eeeee eeeee ee.Q ee eQeeQ eeeee eeeee fV V �p �p V:..0 t7;OQi {Op NpOp t7n OOtQV, MMN-O OaWD CWDC� 0.0.0 �pNp tO�N W.-0.m OOXNO r mytp X0 aAavm W e� MOA0v MOMOX V m M m0NO W 0000 0,0M 0 T.V NO OMiNTA mfhl0ne MONGOL() NOfNV OA ONNONOO g808—.000 V 00 0oMyN0) N 10 X T N V r O m.T N a H O M O Wo_v e r 0 N O X y pp mm m m e XAANm OO W W W A @AOSS§O oOyO-, ImnO OIOnOO. mmOQe cp2.pppW Ippnfppo MVO fpp CA AO IAGn ICnn 1pn lCWn IGWn IOAn pO pA p00 NNN N�mn In In In In AAAA AAAAA AA 0n0,� t'OfnO �m u).o OO Inlpn2§lpn OIn In In In In In In In In ('('f' § min SSY, momma m oomm LrIm nf7 t+� t f h f h m f J f h f 7 f 7 m mmm m m m C�mm m m m m m mmm m m m.m m m m 0000 00000 00000 00660 00006 06666 00000 00066 00000 00000 00000 00000 00000 o N ,Ar, r r r r r A AAA A A A A r A A r A r A A r r A n r r n r r r r A r r r r n r n n n r r r r r r r r A AAA A r r n r r r M t men,Irn rA Wr Ar W NW MBW WvIr Q IOr mAO V OVpNr A }OvNM V p 00Q W V TV O V f Owm( n ,v00NIn ,NN0W vmV000000 0 WW0Omvm YYOpTmNN01T4N0 �eW0 OVNNN6MO0 OemNm OTWmg QaAMO NNONQNNmmN O ' __ _ NNNNN NNmmm IAnNnm00mmm0 nn WWWWm mmmmmw 2222 22228 A2222 822 22WPmqA AMA mP08 22222 2020082222 22222 APWmW 22222 m mmmmmmmmm 00000 mmmmmmmmmm 000.0 .0.0. 000000.0.0 ..0.. 0000000000 0...0 . C00pprnmmW XprNoMN m NVOOAMmgAO.OmVMWm, NvA mx,,Ot0OW0 00vONN.gcoWrmoOLgcv 2pAW NWW MCOP0OM00Xp vNV0AW0 ONe}yQN- ` rrrOWOvh0 OrWTO vNWwOi0 N0,. o mYWW m ' Mm0yM MWWW.TTAWTT TTTTm 00000 OOOmm mmmmmmmmN NNNNN NNNN .WWW WWWWW mmmmm WWWWW WWWWW WWWW TTTTT TTT T T Nm{fhpp T T T T T T T T T T T T T T T T Z r r r r n r r r r r r r r r A AAA A r AAA A A A r r r n n r r r r r A A r r r r n r r n n T T T T 00000 TTTT T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T 0.3000 Tr Tr Tr Tr Tr Tr TA Tr TA TA Tn Tn Tn Tr T 0000 00000 nnnnn nnnnn nnnnn nOnnnnnnnnnnnnn unnnn nnnnnWnnnnmnLLnn nnnnro nTn OcOmvMNnpp VvVvWWW ppVWNmOmp. NNWVVV VroNoNVgnNM0WVO W mNXCMN v omco fIomn m fDOv oW cOOee N0d000 0000 OOOOO 66660 66006 O O . 6666 0 0 0 . 6666 00000 6 0 6 6 66666 OOo00 6 O.N OD0 o V moQM NAN W.- m ' OmA W 7NWON V A W TOS np OnTvTQOre0 NhVo M 0 N( 00W OMrT.-NmrNAOOrWvmVp SNODNa0rWOiM nrW 0000OOvMV0 MmCOnrMpNVOW NWWWW WWTT TTTo0 0 . NNN NNNNm mhmm meeVe eeeM0 IO W0m0 0 • m NAN AvhmNO W N W W Ovv'vv ,eMr Wr[ N W NmV Nv NO000 AAyvwh W OW m0OV 0 A. am OOW0 nAD N( 0mXNN O..n nWWTT 7000MmMM a00M0N0 .AW0 O�NmV 0XI.- OOvNe OvNMV0000000 00OOvMVMWOW 0 )0M �0000 mWmWDWWMWW 000000NI th Cr.1 'goM0W mRN O W W V v 0MOA V Ny W m p 7 001.-v0 000000 0mW MmANNOSNV - MONm ����N, 0WQTM M000f0Mrmm M ,CPmVWmNv m 000000 M WNNNNNO m00OvO. Nh VVVVN � 0Q0NNNNA m0m p00 vO0TTT OOOOO 0vM . NNNN NNmmMmNQ 00 00000 0000 WW 000 0000 N N N N a O mTmN mm MNNO W O V N Aaav Mf 0r V NNpp00V WNW MN V rW MO � V WnMONO VV Maa ppN NNNNpp Nx. m0 em0, 0uloON o mm Q 6t.:66 . 6r:66 ANNWONyM6r4.- 6666r 4,-66N 0OW NV0W NNOM mVVVV[ 000OWrVArANMmWrO OTOTO OOOOO NNN Nmm Me Q 0 0000 WoW ,. WWWWW TMO000a N N N N C (0 W R 0yyNQ m mTV m o m V O N A N W r mM y V A AO Q V r N v M W W O N V ppppA QA vN / O Mgov66VOm 7670 D Neq Nm0 x DO MXXW W XXX,: tV 6.- 6 INp�466 1 .-660 6426r: c464 66 466r.:.- 6646,1 r. -66 M r�.oMe W fM r�p6 Oi QM A N O OQ W N 0 AAAr W NODeW OMX W DmDTOM mAmOO 0000 ..... vvNNN NNNNM MM mQ e V V QO V In 1n INS In IoIL IWn ..f.o tOD fWo fno pp pOpp ffpp tp y p A O tOh r v O T m m M O V O N m QM 0 N 0W V Ov r m 0 A I n M v q W NW r r OOD W W M M O N V 0 W O M l n r m v N V W W v V W N l[m m oo m N INH ~ NCMOV( Am6N VmW�0A W ON6,m.- NArOMTWONmrW rM6,O IXOW A.- h6M 0V4oMOVIXO OCOOOOO VOm0, Ammmmm<VVV VVVVV VVV44 44 ,� VVVVV VVV VVVVV VVV VVVV VVvve VVVVV VV V mN mOQPmA W vm00 .- r - m6N ONmONr� ?rCONm OW NOm 00X,1W VOM0 O0n00 OM00W000MMON4.0e.Wm commO 0NN 66.-6MW0OmfpNNV00 NOON660WmNOO66mrVp4N00O VMh mOWW N00O NO0 02Mah 6myQepAI rn 20 028 StMMmm mmmQ QQQQQ QQeQQ QQQQQ QQQQQ e Q Q Q Q d o O NInm e M V m0 Mln fmo m0 W trprAAr W m0' Nmm4O mmNVQQV V TAWW M000 MMO7NMN 7 mNNN77TmOm W n 22220 0 0 O nn O 22220 OOOO O0000 22222 nn0O2220022 0(O2222222 7,6-00,M ..WTrm T W OmANNvO W O ',ITT W . n W vm0 0vvvNV X00W W N0C6-N ,T mmTMV memNN 'OON NOMI WeAA . OMM rW ,0 NMv mO MMm0W 0, 6 W04 O 6660 4y 4y0 66660 u .66000 404 ( f4 ' 4'4444 44444 vava4 a4a V 4eve 4ee QQ4y4 4QQQQ QQ44Q e4444a4VVVVVVVVV VVVVV 2N N N N00000 NNN N00000 N N N00000 NNN N00000 NNN N00000 NNN N00000 NNN N00000 NNN N00000 NNN N00000 NNN N00000 NNN N00000 N N N N00000 N fN NN fI ,I myVW 66606 06066 00 V OM co.—4,6m 06666 60606 06m60 6 Op 'C O VNNNN mhM pyeQn nOm mDWW0 MTToo NNN M0R00 In0o0 m eeee eeee eeeee VVVVV QQQQQ QeQQe Qeeee QVenn 0000O 000 OOOO Rn00 OO OO 0 6 6 a) U 0 E m 0 _ O U III 111 n o "n ) O W 0 04 m N M00,0 CO 0 2 0 V V 0 C' C,0^, 000,0 NA CDO C 0 CDV N CD V0°,0,0 ON OCN 0 CN n 0 0M 0 `p NVN,, nCN pCW{ C) N. pND CDC � W0m Dnm, N0nNN W 70 N0000 p0000 V WOm opWWyyN �OWpp W,0n0 ' wWW A r nm1m V O0nW 0A mNWM040 0O700 o W10N MONDW 70W70 lW00 ,NOW, m, n N WVN OAW N0N WM m A0WN OOp,0 VM,O0 nWWmN 0WAW VMNN,. .-00n0 WN,0� W rnrA nnWWWWOW0 OW �apa66600WWNON ' OOcc06NOwrG WWWWWWMMMwwoogW mD00W WWW wwWw DOwww WWWoocopD WwwN JDWWWWWWww wDw MWm WW W WWWpW W W W W W W W W W W W W W W W W W W W W W W W W W c0 W W W W W W W W W W a avae vevvv avvaa 44444 evvvv vavae vvvev 44444 agave vvvev veva, 04444 vaave e (2R8t% 040 W AN 0<O�C)v O-1222 W I�W rm Nt00000O CW0 W NNO Cc4)NNm NE ON){NMN ON)tn-2MO CO W @0 W OfCOON W 0 00000 O g X07 Io W 0N<N W M(:OO)C0 tigmN 0'M0 �pOmN 000 W An W W W W W NM W V V V mm MtNDAON)O :(0,000)0 W r 0027000 A Lb V A O N W W O m W W M N W W N V W 0 N m ;6::4P-;14. V O'4 0 t�t0 0 0 0 0 n A r OW W W W W 0 0 0 0 0 0 0,,r •,‘,.. 0o W W W W W AAA A O7 W W W 0 0 0 0 0 0 NNNNN N N N m NNW cmtt�o10 Q MMMMM J 000 ..... ..... W to W N N NN NOONO OLLN')OOO ONONO 010(O10)O La. 0007 f707070,10)jM NN W W j(j mmm`m ( mmmm mmmmm mmmmm) n`ni tai`o°i c�`o°i mmmtmm mmmmm mmmmm mmmmm mm t�mmm mmmmm m o 6666 00006 n66666 l 60000 66666 6 o o r o 66666 00000 66666 AA00000 66666 0 n o 0 0 66666 O N (t') 50 C hNNp V a Am p tDga gM F 2 grPr W V y NN N 7 V WWt0T cA ANFtO MNSO.2 NaSA0g, gO m OA pa 8,N A M ONA W .X6W VW2r mWOV0 mWtANA N .- N4OAo ipp =0.-60 or-66.- 'WAW N.46 MpM ppmplt ( pppO ,". WW0nVOWNWpOW- o0m0NA0000 000, nnnNNNNN NNMMppm.- V VVV Vo(Oo o0WOoon FOD co co Dm CO AAAA nnnnn n A n n A n A A A n n n n n n n n n n n n n n n n n n n n n n n n A A r-,,,, A Ann n n n n n n n WWWW mmmmm mmmmm mmmmm WWWWo mmmmm mmmmm mmmmm mmmmm mmmmm mWm .WWWW mmmwW r WWDo,.. to . C gM W V N ,000 r1O0 log MMM V OMN0 O0mA4 ,0000400') NNNMM tot646426 0 top, M0000, 00,00 V W r O) w,ON W top00 o0n or-000 th =e6666 66666 N N M Q O 0p r 00D 0 0 7)0 O N yO t o t'p A ONp m O 4466N:HRH t666.-6D O EMT, t o V t o tWO r O)O N 66N:66 RUM tWO r 0 0 0 666o.- N M Y l O M8§ M 00i 0 0 O mm2 V C V V y loll)lotolo WNOh W 00 W W<p W W W W n n n n n n n n n W W W R MMM MO0)O0)gg 00)000)00)0 000 O O 0 0 0 0 0 0 0 N)N. N.N.N.N.N. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Z nnnn nnnnn mmmom AAAAA nnnnn nnnnn nnnnn nnnnn nnnnn mmmom AAAnn AAAAA nnn6WW W ....D) v°')u°'D... 1tD')1°'n v°').. 1Dp)uD')v°').. va')mmmmm vm). O 1r")1Dn.. 1Dn)O u°').. h um... (np n pn n. n lin'1.o o lin'lon o�°'�to mmmmm o ln.. lon lin'mmmmm N 0'-O W Won W m W 10 V mto 0 V 0 V m 1oNW W A Wm Wm6 00001,0000 V 07,10[A l OM,M V 4mNA OW Ohlo c40, oa mMMO)W 000 _1,.-45-6q 004 V m0Nm 00 W m W A•-W 0n W V NOn W MM W 00000 00000 --666 -�-oo .-oo,-.- o�o. 66. 6 .o.o. .6660 0000 .oNNN 44,65 -:6666 6 ,,...NOWN 0 0, WOAOCNNNNOW N 0 A A W TN N CM am06 4«n m001O W0 04,0100 VNOOODCO00n [OWM <166.-c2.- 0n 0 N40 0 WWmn 0000VNr MW NC 0 ,NV MOVMM ONWW n0On pmWNM !nW g W0ArVoV0 WO, 0,OOMO0W WA N,WNtON ,WON gpO, O0 nnnn 0WWWW W000m 000OO 00000 NNNV MM Mh VVeV qV000 00000 4 NN N NNN N N NNN N N NNN N N NNN N N N N N N N NNN N N NNN N N N N N.N N ZNMpp10OWMM .- , O, M NVOrVNWOVNN, 0AfQmW70OONWMnWM.-NDO , VO D0.1 N710, WOM, W O DAom 00 0cmOW M OOA WO MOmp0, 00 ,0p-Q-, 00NtpV0, 0O.- NO-, OmpVVnpMOr OOyAWMO,NO 0)N Me000t000 , m00Wm.-NM Mm700WNNm m00 NNN NNNNN NNmmW m7mmm mm V 0, O V O V O V V 000 1010101000 00000 WWWWW nnnnn nnnnn ,,MMM W th Q M 0 Y^OlOmN WAGON 0oo'48, 0N:27EN MW2N4 20004 NNNWoNnmr M8nM2°..8-Ale. 000222 P4N4VO 2N0o4 V th M 0uN0 r-:4.-6w .-6N:66 •-05N:524 mMmN .-.-666 ,0404Op( rmrtp1[ rVO� NrO , 0O0 U OOm2�nNNN7NN OVMVV UN 'ARM UNE NnNW 1 W000M� 0 Q 0- 0 xW WA A NWN rr 00 O O2O m r00,00 m A M M nOVOMNmVOW�M p N V O p O mA 0Wm0AOW m0n V 0,VAO0pV0hp O0o0Ooi) 20W tN ` M.-M 0Op0 WW , 000V0WNoOM.- OAO0r AN. 0,- 00p02r20,0W p0Wm Sr-- p 432VM 100W pOOWD M0MOO) loA pK0 p0 , pS0.- 0 N 0 00�0N NNNNNNN mNWg12 NVVV Nntg0NhWWWWnNnnNWWNWW W00N0 0pp2p 2pppc7, O7OM[7M M C D T WW y pp mm,,,N0 M U lm W m W 0mM, Nr N00)tWo V NOOO 00,N0+) tW 2010000 W NOW A nA W MN (N0M0 W M mO2,M 000^m 20000,n mOOW 010000 O m w N V W 0 N W H I n M A 60.666 V Nr tV n WV 0 W M4o6.-N: m O WA MON 052666 0 0 0 n66646 NN M 6665-N: oM m o0AA ,m W0Mp 0AAON MO0 tW NVo CoWN M OOp0p0, L00A AAAA WWp0WW W000 0000 00000 NNNN NNmmm 20407V, VVV• V aV000 NWoWW W NN 0404040404 0404040404 0404040404 0404040404 N NNN N 0404040404 0404040.404 040.4040404 N 2 (Op 0 .-ONV0000O WVC20oAO2 00, , 0200p 0ONN0OAOCMWNAMoNC 66W0pp000 ,0 MMOD 7 0W0h CCDMOON ) 0M 000 m F WWVN OWWV nOOV0pNWmO ' v2M Vn7n MNRO ,C042G00, N�p0 ,6,-640. 06666 ON0W 0O N ,04, AonmmW m0p , 000000000 , Om yM (o0,p02pp.,, 000 [00 00000 NW0WW ppWAAn AnnnW mWWmW W 00 00000 O 000 070N 000 0W000pp , 0000000 W00000 ...aro oW.W0 roar. 0000100010 m W 10 to W W NAeon0000,M00 W 00 ( 0000, 0N,.-0 O <O V -TOA W N0,. ^mr0 [ 0N'K000mDm 000AW0 ON m. , W.-NM,,, '4O 0004 20 2 , G NNOn0 46.526N: Mp W ONQOn NeNWN W 0 Nm,MV 0mmNW ONW 0Or4WVVV 46664 N WV OnV N 0 n F00W M.- MM,M22p0W y0, m00 mm, 0nW^ .- Vp 000 �$F$� 040040 0N0NNN2040 00 y� p���W02000WWWWM010100N 0100WW p000WWWGVVVv 0OOO m c V N W 'mOmN AODOO N 7000 AN,R W l0 0000 W l0 W ow,m. mmM7N NNNO? NN07NN OON 00000 007 W 20 •--000020 O 2'-'777... NN mN Nm 2222 22222 22222 22222 22222 22222 22222 22222 22222 22222 22282 g2,221 2227)2 1 E Com:NMO 0,AWmOM Mop 7)WONWW AmW0M ,DOHA00004OA,NWpWraa 0pp, N oNpp v0O0VON0 0Mm0om 0 007 O 000 00 - 70 ',MOM, mW00 4444 44444 44444 a4eea vvvev '44'444 0O)0)4) 14)1`�))nlnin .0... lo'n1o)nln lQ)17)7�7 1,$444 aeae< e 0=0000 N N N N00000 N N NN00000 NNN N00000 NNN N00000 NNN N00000 NNN N00000 NNN N00000 NNN N00000 NNN N00000 N N NN00000 N 0 p 000000 0 0 0 000000 O O O OO N 000pWOWp0000000000000V00 00000 0000 66666 66666 666o0 6666o K6666 66666 6 .-466 .-Amm.- vo6.-4 66.-46 6.-5rom .-4526.- 466.-4 5.26.-452 6.-466 .-4646.- 46, N0,0N00006 - 00 W00 0 0 0 {2002y{20004 ::: O000 0000° 0000W00N7W- ,8000002 c P Ao m 0 • • 66666 n a ^mmQM 02N vS D v000(0 MOVV, MMmon0r0mOrmMONNApN< OO 7" M0 ,NNmN0M0r8mNWM20vWvW4—M0,0g§ ,IMC2om Nm MMO Oo _ mppRON2 QmMMO MNN pNOOONO [0008mANvOpMV4 = Q2yNN0MNo M2 Mr N M M0 0W0Vg0 g228r NO Om 0m 4QN0 ww.NO m0MNO mFmr d 0V OV AN22 MWWW mm, , 0000Q MNvv 002 mnN0 m0W6 0 0 WW 22 �g,Tm,T �GGGGmm JAAnr AArAn AAAA AArnA AAAAA rAmm OOOOO mmmmm00mm200W mmmm mmmmm mO0mmm mmmmm mmmmm mmm . mmm mmmmm mmmmm mmmmm m a 6666 Eco 666 66666 66 w moi ©6 w Geo 66 666 c6666 co co 6666 romoi 66 666co6 Eco 666 mw O6 co 66666 m 4444 QQQQQ 44444 QQQQQ 44-444 QQQQQ 44444 QQQQQ Q Q Q Q Q 44-444 QQQQQ 4444-4 pQQQQ Q m O�70Nm W 120028 000272 20NNT 0 V Ntr') 00N TO rNp00m0 '0200200 N000)CO 00N V m V83E8 00 CN00 0 0c 010 W M q 2 2—0 m M A v W x 0 0 0 2 N T 0,W m m O m m A A r r M Q m 2 0 _m m.8 r N m W m m 2 T N m 2 Q r 2 N 0 0 m m M 2 0 {n C W.-00 m M m m k- O O 2 m 81A0 f0�0 0 0 0 0 0 0 A A O T A 2 2 Q m T O N tM 42P."82 N M 0 m A m O O N N N M M 0 N N N N M O D a s O p V Q t�J I n f O V rO�V mO�V mO m m O BOO �m0 m m m 0 u„) p m c O p p[p t p n n n r SAO S AO m�m0 m t A cO O p '1' J O 2�(J M 2200 E�E�O g g O 0200. n LL's N T i T f�A A LL'i�0 LL's�0 N N MON m R 2 N m m �0 N LL's�0�O N tf)N N m t�M M i 2 2 N 2 N g N mm,,,, M MMM M O d M M M MMM M M MMM M M M MMM M M MMM M M MMM M M MMM M M MMM M 0 0 0 0 6 0 0 0 0 O n 0 0 0 66666 ^0 0 0 0 66666 O^O n 6 66666 OO000 O O O 6 n 66666 6 06OoO O O O 6 pi 0 6 0 6 O '- 6666 6AA0121266A1206 , M 44666 0 C ,6�y ppNWV0060m NNM NnM6TTp WNOM00 Np0ON p00NC0OCNw0 000Mr4mm0 00 O66r m0OO0 000860T� T8-N0cCOTOO 6.-646 0 Os 666,-., 228000N2020ONNr000WC"- 0 � 2NO0M ) mNTTmNTmm20 0Nmo NNm0mNmM2O0NM AC0000v WMMtMP22 822 2 2 222 2 202 m2 22 2 2 22OOONOOm OOOmOOmm OO 00000 O MMMc,2ONNNNNOONOOOOONNOOO ayTTy mmmmmmmmm m..mm mmmm. .m... m .N . . . . O .. .TT.T ...02mC W 0 ..-.. N vNNMNrr AN O mmmp 0 •-Op rNM W M0p O m M MNMNM2p ORmr0QM mm mOm OWMm , rp7mmv, mAN M 0yD p000 ,- O 00 Om GQm0p0 0 000O60OT 0p ,,MMM NMMQQ 800 m 2222 0 O 00000 066 OTO OO O Z mmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mm0mm mmmm0 :0000 m 0000 00000 66666 66666 66666 66666 66666 66666 66666 66666 66666 66666 66666 6 _I CNN,V rC2Nm 60NQ O NMmOW N W N 00 W fNOrQQ V 620120(0') 66OND W W V OAmm N W OMm NOMOMMN Mm W fMm NMOMT OMO O O NNN N —4.--.-6 O,-.-NO 66666 O.-0.-0 MMMMM CON—M m 00)010 N .-N666 OOO—O 00.—0 0 666.-N N N m 0)4 2 3 24N 2082 hA MNON2 00 NNN2 W` r NmQ.- QOmC12M4 7 M N6mA 122TmQNmMOfN6 0M0 mQ tW,vN m088 M , M 2 MOWW V NMp2 N 0 NO W mmNN ,:cog.-06OO OMWM ON mMVo ,NN, N ,,MWWWNNpMM MV 00 VV0VV0V ,,,WW NMMmMMmQQ 0 0000Q O V VV N NNN NNNN WOM m�QNAN 00,0000120 rNm W O MONMO m V 012 V W OMmo NNI�J Om v rmmv v,,AtQOM 1�[m,W v Nv 0 V M ANm MO N2211)2 M 2 O _p� o p46r:6 r:6666 fps�p0 p _ w W W W W r mONO NNMm2 2000N m.-464.-NJ MMQ QQ 4N)mm[m000 mr,,, A W WON OGWGM W f Nenn.ad.aO m2OD 000 �ANr r mmmm 22222 22222 NNNN NNNNN NNNNN NNNNN NNNNN NNNNN MO')MMM MMMMM MMMMM cyMMMM Cr:-, v' Q 00 00 CO FR06Am '-OON2 NAm2,1 4p,028 00N2N r6;-18°T G°'8N 28, ,m 28"m 4°2'8 22'8nOQ W6820 27,2mr A a yN4- D�000 0 02000AW000002000 ✓ MMM 0MAQAAm M222 0000 00000000 80004) 02222 ,aW222 0mmm m0 0m p Dri O Q a It z M O O MMMMM m N V .-0 W 0 2 W O , W W W AMWO M A OA 0 0 N M N m N 0 4 W m m W 0 N 4 vvM m0 0WN 2TAAm M m 0N0 T 0 2600OO Q VOMN , 6r22AO .1.56164 N0.Q6OWNN bO OW Q Q ,. WMMOMN .7060 MN02 ..6=06 ncl,,s,,0 mW WhV 0v0NA NDMOO Q0WQT Q NNNN MMMM F.-32A AAAA 28;i28 CQ00Q ZWWWV WWWT2 82L7 mN 6666sQ2220 22222 m0mm2 fs2,2222 23 C D T CO Wx0VNMWMA gNrMONOnNmeveWmV0 0V `Mv ° N0NmmmMVm,MONm, Mv ) co0 ° uyMO M,M0.1, 7W , N rmn0 m 0MN m y 0 v , a 4 , 0 ,> , Nrr,mM0nm0NN 2 r" mNOOvNNNMMQ,, 0020WmAf , MWWmLmmWm2 O21222mWN NMM V 0W00 , MM DW O NNNN NNNNN NNNNN NMMMM M MMM Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q 2 - a Ir0060 0000 NNW4m . OO0 N0roCr OW00 NOON0 ANaN0 02000 8000 0 122228 06NWV 2 1- C W 00BrW 2'MOONN0,00 NNNNr mC0x0 NOWW126 TNmV coNo0 o000N pN8OvVOOWV MNQW vMMVMrNrM0000 N 000D001212vv NNNfrrrn ,AomMO . mO0O002 mmmm mmmmm mmmmm 00m00 W< 000 ( 1212 ^N - AAm0000mmmmmmmmmm 0 x 4ONN0204'02OW0NmM00000 12WC W820WCOmWM,000 W Nm W rrV v� O0 V A2OO00820mDW2 0 00 2N 00 NO , ON (pp0MON-66 Opp0O4 N ,F Mm00AD TOvmQ NM000OA6WMvN0^NpVO0 ,ppm02, rAmW MOO 0000 ( 0NNmm V00 , OOnN MM W,mM Ov4mm 4- 0 m 0022 mmmmm mWWWm 2222 mWmmm 00000 mmrnn , rnn rAAAA AAAAr mmmmm mmmmm m22mm m vN 2°-aN�2,, IOA2 h� 6N2h8 08224 A020W 0604124'8 NmO.-O NM664 OOCOAnpm'1 7o0Nt00m OA)07m0 4p0(12002 64N. m O ~ Wt00mm mmmmm 0m80m80m20m20m2 0m20m80mOm0N0 tAOmc00W W 060 t6Dm22 64404 <4mm8 MNNNM MNNNN NNNNN MNNNN NNNNN N Ej, y e 2000 208 W O W 2 W m0 22000 ,NNW V 00 NO7 W 1- mi60 2000 W NN V(000 064' th V 000 6 V V 8mm 60?,006 6 2622 �Ncmwww c6oc6oc66,6 66662 w`wmww 66664 444-44 MmNmm mmmmm o� �ho� �+mic+micm ��cy�c� M`m4.46 m 2 0 0 00000 0000OOOMm W mmOW 0780OmC.-r MNNMOM., , m " 0mV W r< 6,466,7 4 W pW W00 ON ONm 0 0 OMmNLLMm A 66, m0N 8S 22 120mN m t:18880Mm4 Q4 866 21222§ 4pp0 awacc 22NM0 20002 NOr000 QN8"6 2,7202OW812; ,44'62 2 a nrrA ANNNr rArAA AAAAmmmmmmm 222 22222220OOWO OOOOO coisi M m N N U 8 , E E 0 411 mmNm NtmtmpMANN mp NmmmnmmN Q mm� AO VNQ 0O.= OOfOM� m0Ovp QM0��aNpp 00m = n mmON� V 0 O p �pp . 4SV.0 .0= 0N A .=r. 0000 nh GO NO cmouN Nme° Ov, MmmANfVt.-0100 m,-mnNNmNm mNNMnA0OrNrN8" =00. mNN .N mmNAO NNNNM8yr0'NF,TvSm .m0ms w8i0 W mOn<p,m SeMN N--00 00 00 2G . 0o 000OOpWW WpWWW 22222 ONNNmNMMMO 880AS VVA82888A88 aO. p c0 J m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m d 66 66 Wco 6 c6 co Dco cd co c66 co 66666 66666 mmm0v GmW W 66666 DW 66666 D am-ea QvevQ QveQeQveQe eeyay avevQ QveQe QQQQQeQyQ QQQve QvveQ aveve avQQQ 0- MN... eNm88 nnmR= W mVO V W M8 V 8"r Nm Mm,m mO r = f 0 V V nM 0.-WAN m8" 0=o NmV. V,=.. OV n M . O.M.= NOWN 00= O .NNS= ,000. A rVm 8pOm OmrA8"OOnO8 eOp 82g22, m mQNrmAm. O WWW,, 0mmmm ArAA . f0 22 22 mmmMmp� mMmMm 0 §§8§ 8 o908 88888 Qm988 08 R28 88888 88 882 88'888 88828 28888 m 6666 ^onon 666 o p 66666 00000 66666 00000 66666 00000 66666 00000 66666 00000 O O N nI CYY qOm(hppr NW O ,c00— m CM0 S ; A MV yyO p 0 v1.04.4.0 N MNmOmr�maONm m ;VONm,=-NV ppp;psN 8"Cr 2 W m WlVh 2tVh8QC 2QRAQO e V 2 W m Omm 0NNNNppWppVOS• r =N QMWOM=mAN. mW= SON. AOR,0==N m mmm. WM ppN LOrpNN 0 M. . mO W W W 00;0 ONONO NNNON NNNON NONNO NONMM 808 e0 OO8 00 88888 OmmmO oOo-N 0m " " QQQQ11111 ypaazsIplIN syIa1,Qp<1 CQTIM QQIgg NQQgg g CNOMOV V =r. 8" OWNN=NOWONM V. OOM =AMMWrmoOQpWO mom00 N M... MCOM = WMNN OOm r tRppm8"reromm== Amm = MV .rOpN ==Omm ON6m, NWO . NNWV W = . coONMO ..0 N.MV = O NNNNNNNNfNN NN NNNNNNNOpOMmht . M. 8MMWNM . N NNNNNNNNNNN Mmmmm ..MM.. i .W m.. Z m m m m m m m m m m m m w m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m 0 00 0000 ... 0000 00000 0 00 0 0 0008"00 0 0 0 .0000 0000 0000 0000. 0. 00 0 0 0 00000 0 JRW00, WNQ p= o, NW. •- V08" Or •==N• m ' OgMA 00omWDfW VVmatm.0 ;. 0NMQ 0 0 =car...-. p0�Ing 44-6 .-W.,N 6 ONO.-a mmOOO NM--OM OmtDr O 460;Q coca.-44 .-4666 NNMOM m 822g'4 N8C8,c2 MrN W g .c28g2 8";;22 OMmNA -t88,TM 284g° 228t:,2 V MN W C C N NTS wNM W A Oi O N vvvv N M oQQQQQ QQQQOm N v N AW N AON N N O n mNN ^ e0M•r4m-mMMM; MMAAMOOOO OOm MrON LO-46666 (.N O O N mm �� ss �mm�m mmmm nm•� � N6� NNNN° WmmWW •eQgmvveQNo mt;ono 82'1'88 mMVAr 82N4V4 8888m 221'28 SNTrM 8RAg?m r-22A nMoNrm NWONA O'-N"tmO Z m 2 O m6 mo2oo• OO MN... VQ0N r °mWW TMMMmmmm 0.000 000O2Ow www. =NNNmmmmm OMMa000 m 00 M Q e e e e Q Q Q Q Q e e Q e Q Q Q Q Q Q e e Q e e Q pp yp .-emN oS moNrO W CON�{'�m7'tmh OA 0MM pQpN 8mm W N V. COOQOMM noo4m CO W a�t'�r) �tOD �m V O COONOnmr N Co 0 m t h;N 664r.-Vf h N r q 6.-46N N Q m W r S N l n r O W W e N 1�W^8"y r o RAO M tQO m W mom 0 M I(W O r m m N W m A QN m W O 0 N N N N 0 0 0 0 0 0 0 0 0 0 718888 0 0 0 0 8 n N n n mmmmm m m 0 0 0 N N N N M N M N N N N N N NNNN N N m m 0 0 0 0 0 N th f.1 m m m m m m m m m m m m m�p m m m m m m m m m m m t 0 m m m m m A A A A r r r A n n r n n r r r A A A AAA A A n r A A m m m m m m Q Q th Q n r r vm r a NNN7Qr • rM`�MrO WrMWNWAM•-W - Wmvm08" oN0NWm_Cnnom aoAWMmm Wmn0e mro W000m OW 6666 � oNp { pm rs WmANN OQpr W 00;4 Mm VV ( �mmm =1mmmmWWW IWW 000( NDWWW An ` AAraWmmmm . mm mm C ya l0 . Ov O.- 0OVMrNyy 0 N W V Nm V{{pp W VV NS °NM W rW Om.-O m .V NA. W QMW OMmrA WNVm.- MN NIr N o Q Q Q Q Q Q Q Q Q Q Q Q Q Q 8N2m8 666.-4 0 0 00000. MM^ MO..S 0MN 00. T20,04.'8mm mmmmm o " WppW pnm 40 000SA A8888 80000 00000 01$10 8 0eQeem 0E—,N— AN R p 0 N000N0V"n R W M •r N C N n W W[V N0 0 0 O NN WN m W M m 0 O W r pp W m 0mA7ON 0 000NN mN0h O 00 MyrN 8"0;)00 OpO QQ6 000000 OmmB 0000 2 222 `7)22"ppNMSSSSmmmmmmO0 0OO OOOOO O OOSOO OOOOOOOOOOO mmmm mmmmm 0001 SmOmm mmmmmM00,00mmmmm 00,00,00,0 MCPMM0 00000, mmmmmmmmmm 0NOO mmmmm N OTN 0N(.�00N� VvOA W W W h0Nh rTRNnNONN ORM 0r0MNMMNmOr wA.-000 m VOMN 0 W NNM 0 N h0i0 V0m0 oNoo om O °°2 '46 m���o2"2;: HETI mggggggcgggIgIggIgAgg gmm 22th MMMmomTm �� 00m mmmm mmmmm mmmmac mmmmm mmmmm ~Y o n N m Cl Q O m m N m A m A{0 h OMmM mmOmNmm mmmmm Ommm Nmr rm NmO mmmN .O CmmN A 0mmmNm rmmNmm0m m 0 VmmO2 mAmN NmQe._ M0MO OoQ mmOoN 0 N Nm 0NV . m mO NN�r " OahNtj hQNMN hn04' NpOmVVWC rnW WTAMO0 ;00m coNNN me ..WW WAnr mmm Wmmmm 00Q8"C'1 aa� .Br.-oro rOoNV MmOO W tNO,Moo, N V OM� th Nm Nv ROfh NASO MmVlhO OAMeO 0.A00 N�(N V MC,i0MA W 0 W rOtrD VW W omom mmmm arommoo moomm mmmmm oommmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm MO.-MO m �Ommm mmmm N . ONMO7ONMON. M0CMMONV .-OMN . 7nrmmTthN0eN0a m0QOmm mC4...C ; O? . 0m .V Doo (0 8" 45.66hW hDm QOaA � n MT-ER ROM AMU,VN 'Z REM NrW yOpNNOaam AEW, Qe O 6 6 0) N G) 0 S r C t 0 FO 0 ill III �OON,- mo.,. ,AVMap,.- W ON{IWpp yWA0W,< 0 ON0 WO9m NO MpW , MnMCOO 1r n M 74,12,73 pNWf1Oen- 08 O)W0I A0WN ,E 0 mrONNWNmn mNQO� WWWM,MW ,-WWM,, g 7400< WWW W EEM MMWO00 ma60mm W CD O6 W 6O 0 0 W W 6 W 6 6666 co c0 06 CC 4444 444 44 444 44 44444 QQQQQ QQQaQ Q , , , . . . . . p p nM WM p. . . a 9°`_.y0yOme O)[)rmm) 000 M W 1fiO0) 0) OrN{WOlWO 0,100'W n 0bcWo lIj 0,-NN M.-00W Q,-rM Z t0O O 000LO 0 0 W V Q Q Q M M N NN,-,-0 00000 00000 A W, J AA MM MMMMM MMMMM MMMMM MMMMM MMMIW)A - 6666 n n C n C 66666 C C^C C 66666 C C C p C NrN. rrAn CI) W W �VQry U) tMW0Nm,-pp.- LOO ,NN. N.- 0W0"OC , 0) 00WOOM WWWV AW N <WO 6,c464 N.-,-.- AOWA.- 6614 NQWNQp =moo. 7,MAOM O O ONpjm W" pN NNNNNNNNNN NNp`�2 7M27M MAyA SITS p/eI/ /III,/ III// 11111 OIISaa .=-030.. " O ,-NO .-An- O.1.- OV0, NNOWOM0NW0OWWmW CWWrOVpNpmAO44664 cVMMyfV ..OO0 OoV MNOm 0O + N mmmM .-.-.-00 e mmmmmm mmmmm mmc'mmmmm Mmm m Z W m W m m m m m m m m m m m m m m m m m WWW m m m m W m W o W NN WNW N W W N W o N N NN WNW NW NNW N o W NpW � 0mW.-0 mVO� OMO00 000EW0m0N00c0 O N .— 000 O00664 M.-CWQ 0.-N.-6 Q.-CM 0.-066 00660 T m m m m m m 0) aaaaaaa¢ W W W W CO CO W CO CO Op a WWWWWWWWW 2 O MmE A A i0 V V AN ON10 8.2QM 2:=2;;;.°- O wmm mm mml¢O ca0 � i0�r SM-E,2,% O�W @?:8R N W•-NN QrMrOO Qr MIp lot W OO NQ V pNQ = thaaaaaa@WW Om mW NOW A W{p i0 u� QMmN W W�QW� QA • 1001001010 0 c O A A m m 0 0 0 N f 7 Q I n W A m m m 0 0 0 0 N N N p ...... WWWW WWrnr nnrrn rrrrr ,WWWW mmWWW m KKKaU:a .1:-..0., m 1p Q—m 000N, O r W M W O V M N pW N r m 0 0 z.-0,N,0 W 7 7 A N Q W W W 10 m Q Q M O O m.-Q o M m Q W A *000, o 6 Y 4.6 fV A C 0, Q V W 0)Q .6644 6NOQ 6N606M .... O O Q Q O WWWr WAMNO r073 MNNNN NNNNN . .-MM 0000 WWWWW WWWWW AAArn AArAA AAAA QQaQC - 00 QQQQ QQQV V.V.M.V.O. QQVQQ VQVQQ COQQQQ • c- U 000 8 0000 L11 -2/ >";00, 8Z 2M W, 1=002W ZZ '_NQMQ NQmQ QNQm- pN!A1NA 0mQNM0Wn ` WW +II _ Oa9LLJILILLLm cL ph664N csi nO6Mmm. Omc.i fO ci664 Nr:066 } J0+Z 7++ CD 5 mWNQM00 NWM0 000iigil " ;_333 .- 0 Q M O - ppppINNVNWMNWOrNNOM ,- 1OCr0000NOSONO .. WwW l0MOm ONv0,000M ONCO0NppO NN OMWO ro00IrnCWWW0OM CN OO _O -_NM 0mmA00m A0mA EMpQQW CN0 O W00.- NWWWV Q0WrW 00,-NN MmCQQ QWIL) 0 .- LQOO 0m0m00000 00000 00000 00000 00000 mWM Zm)mmj C V a m WxAO7NRco0W rNVNppw.-WCMW7Or. !CppNNNm WW.-10, wwm0 OW NONN M gQWm NW.-NN 4,6,. 4,666 6r660 NQQQppN m"MNONA WW000ANM0O QAWO00010 '- WWWOpNO W 0 Om 00 0 o D WWWW WWrAA nnAAn ArAnr nmmmm m00 P pp pppp p Gp p 0 .0W 0 0m W Nf70A ON(QO{pO N�A�ppAMO rW 10�Mf7 Or)O V�N Y�C<< c c c S C 5 N,-,6 66666 aguivri TO)AOOO gOOri00 6oNNm LL w000m"MW W ..mm m m m m 0000 00000 00000 00000 00000 00000 0 0 u 0 0 u 0000 00000 00000 00000 00000 m m m m m 0 <<<<<<<<< W m m=e-,-NM . q.“..-. . 7.-m WnO N0 V '�a. i0p W H 000000000 OOSNm.-07u . 10 '-IO " N NM,.-0 OQ OV V OC rMNNNNNNNNNm mmNN 7C n m .- 1_ WM M M N NMm AM 0 CO,—mOMW mmmmmmmm mmmmm mmmmmmmmmm O0F Wmom $ Ip mow° WmmoWWWWWmmmmmm mWWWm mWmWm aoxWWn4-422 N 0 W ;imp»0eQN- Nm NN Q,-NA m NN AWM M 000p0 0000000000 F_ MAN m W0000 0WV,V U 00NNN0 OOOr QarW Wrmmm NOOmW QNOm WmNNN p 0NN M mN 0000 000MMmmmmm OOOmm 0)mmmW W W m m m e 0. 66.0:1- n M o m 0 m` i:WW O S A WWramNW 0 NNvN (°17-17. 0 NW EMN JJ LLLLyoQWWN rWMOW 0.,..-v. n0. ,{ I7VW0. : r 0D C 1MV0r 03,0.00 mWOO O 0 mnCc.icVA OCOO. 66666 OWOWO 6r7M4 WW WW a ,OW mmmW Wmmmm mmmmm mmm WWWWW rnrnN "J J W W LL LL U 2'6g yy m c��pV.008 . y 2 Y0010N .100. O O W O0N)I[) N 100Lo W 00000 � N 0mZy0-S mOM W pIIm( .. ....,C 664 W 666c4N 10 W 6 10 -c��m �Nmfm7 O V V V N-001 W YNI Va N h r rn p V�F p Q Q Q Q i0 E 10 W N i0 10 10 10 E 10 10 p 10 Q m L„s C1 W co o W m J m N ° • m N OOm m w`a o) E v E 2Z O ,- M . U 4 m W 0 nC1,0C1 ti &Li STATE OF ALASKA MAR 2 9 2016 ako,LASKA OIL AND GAS CONSERVATION COMMI N WEL MPLETION OR RECOMPLETION REPAND LOG AOGCC la. Well Status: Oil M • Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended 0 1 b.Well Class: 20AAC 25.105 20AAC 25.110 Development a Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 No.of Completions: One Service ❑ Stratigraphic Test 0 2. Operator Name: 6. Date Comp.,Susp.,or Aband.: 14.Permit to Drill Number/Sundry BP Exploration(Alaska),Inc 2/28/2016 ` • 215-185 • 316-105 3. Address: 7. Date Spudded: 15' API Number: P.O.Box 196612 Anchorage,AK 99519-6612 1/19/2016 50-029-20686-01-00 ' 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number: 2/22/2016 PBU R-16A • Surface: 1659'FSL,1711'FWL,Sec.32,T12N,R13E,UM • 9 Ref Elevations KB 65.85 17. Field/Pool(s): Top of Productive Interval: 209'FSL,1344'FWL,Sec.28,T12N,R13E,UM GL 18.95 BF 20.3 . PRUDHOE BAY,PRUDHOE OIL • Total Depth: 1100'FSL,4690'FWL,Sec.28,T12N,R13E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: • 15760'/9011' • ADL 028279&028278 ' 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/TVD): 19. Land Use Permit: Surface:x- 635341 • y- 5978141 • Zone - ASP 4 • 15858'/9030'• 77-028 TPI: x- 640171 y- 5982060 Zone - ASP 4 12. SSSV Depth(MD/TVD): PO Thickness of Permafrost MD/TVD: Total Depth:x- 643497 y- 5983014 Zone - ASP 4 None 2010'/2007' 5. Directional or Inclination Survey: Yes El (attached) No 0 13. Water Depth,if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) - 6990'/5860' • 22. Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary MWD/GR/RES,MWD/GR I RES/NEU/DEN,USIT 23. CASING,LINER AND CEMENTING RECORD CASING Wr.PER GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT FT. PULLED TOP BOTTOM TOP BOTTOM 20" 50' 130' 50' 130' 36" 8 cu yds Concrete 13-3/8" 72# L-80 49' 2719' 49' 2694' 17-1/2" 3720 cu ft Arctic Set II 9-5/8" 47# L-80 2103' 6990' 2098' 5860' 12-1/4" 190 cu ft Class'G',130 cu ft Arctic Set I 7" 26# L80 46' 11456' 46' 8823' 8-1/2" 149 sx Class'G',1776 sx Class'G' 4-1/2" 12.6# 13Cr80 11288' 15853' 8686' 9029' 6-1/8" 558 sx Class'G' 24. Open to production or injection? Yes Il No 0 25. TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): 4-1/2"12.6#13Cr80 11296' 11177'/8594' 2-7/8"Gun Diameter,6 spf 14581'-14791' 8996'-8994' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 14841'-15501' 8994'-8995' COMPLETION DATE Was hydraulic fracturing used during completion? Yes 0 No El • Per 20 AAC 25.283(i)(2)attach electronic and printed 21. information VERIFIED DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 1.,L.'" 2150' Freeze Protect w/73 Bbls Diesel 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation(Flowing,gas lift,etc.):N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period ..+ Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corn): Press 24 Hour Rate tel► Form 10-407 Revised 11/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only v-i-t_ 5/R//6 , 14 , sGI RBDMS +-`' MAR 30 2016 �� 28. CORE DATA Conventional Core(s) Yes 0 No I Sidewall Cores Yes 0 No m liIf Yes to either question,list formations and inte cored(MD+TVD of top and bottom of each),and summa r rology and presence of oil,gas or water (submit separate sheets with this form,if needed). ubmit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost-Top Well Tested? Yes 0 No El • Permafrost-Base If yes,list intervals and formations tested,briefly summarizing test results.Attach Top of Productive Interval 11652' 8948' separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Colville Mudstone 8864' 6791' HRZ 9310' 7086' Miluveach 9440' 7181' Kingak 9943' 7585' Sag River 11457' 8824' Shublik 11520' 8871' SADLEROCHIT-ZONE 4 11652' 8948' Formation at total depth: Zone 48 11652' - 8948' 31. List of Attachments: Summary of Daily Drilling Reports,FIT Summary,Well Schematic Diagram,Survey,Cement Reports Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis,paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Sperry,Nathan Email: Nathan.Sperry@bp.com Printed Name: Joe Lastufka Title: Drilling Technologist Signature: Phone: +1 907 564 4091 Date:3/2..S/,(40 INSTRUCTIONS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item 1 a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item 1 b.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection,Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level.Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20.Report true vertical thickness of permafrost in Box 20.Provide MD and TVD for the top and base of permafrost in Box 29. Item 22.Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 MC 25.071. Item 31.Pursuant to 20 MC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 11/2015 Submit ORIGINAL Only TREE= CNV . WELLHEAD= MCEVOBAKER R-1 6A DL :194°(�NOT;;531"."*CFROMETBG: WELL ANGLE> 8NR".." MAX ACTUATOR= BAKER C OKB.ELEV= 50.65' REF ELEV= 65.85' BF.ELEV= 22.45' 14 ^•# 1 , 0101:, 2018' —14-1/2"HES X tom,D=3.813" KOP= 2000' ,' 1l��I* 9-5/8"CSG 2103' Max Angle= 98°@ 12004' H 1►'t Q�'1 1 Datum MD= 11512' STUB(2/8116) �'��,illio I. Datum • rm 2609' —j 9-5/8"DV FKR Datum TVD= 8800'SS 1 1 GAS LIFT MANDRELS 13-3/8'CSG,72#,L-80 BUTT,D=12.347" H 2701' 1 ► ST MD TVD DEV TYPE VLV LATCH PORT DATE S 6 3910 3718 45 KGB-2 OCK BK-2 — 02/28/16 Minimum ID = 3.725" @ 11280' ► 5 6423 5504 49 KGB-2 DMI' BK-2 0 02/28/16 ► ► 4 8278 6505 64 KGB-2 DMY BK-2 0 02/28/16 4-1/2" HES XN NIPPLE S ► 3 9513 7238 38 KGB-2 DMY BK-2 0 02/28/16 TOP OF 7"LNR —{ 6809' +22 10293 7870 36 KGB-2 DMY BK-2 0 02/28/16 11 1 11073 8508 34 KGB-2 DMY BK-2 0 02/28/16 I 6809' 9-5/8"X 7"BKR HRD-E ZXPN LTP w/BKR 9-5/8"WHPSTOCK(01/18/16) —I 6990' FLEXLOCK HGR,ID=6.180" 9-5/8'CSG,47#,L-80 BUTT,ID=8.681" H —6990' FALLOUT WINDOW(R-16A) 6990'-7007 7"TOC(02/02/16) H —10466' P •, 4 rt ' o• 1114W —{4-1/2"HES X NP,D=3.813' 1 0 P t; 'A t 11177' --f 7'X 4-1/2"HES TNT PKR,13=3.856" 1 o 1, • .` 11211' H4-1/2"HES X N1,D=3.813" 1 1 1 i 0 1 , 1 A 11280' 4-1/2"FES XN NP,D=3.725" TOP OF 4-112"LNR -{ 11288' I '4 �1 11288' Hr X 4-1/2"HES V ERSA FLEX,D=4.32" 4-1/2"TBG,12.6#,13-CR VAM TOP, —{ 11296' ‘,..5 .0152 bpf,D=3.958" �/ �� • 4 11296' —{4-112"WLFG,D=3.958" 1 o•• H ELMD TT LOGGED /_.,1 %1 41• • o• 7"LNR 26#,L-80 VAM TOP HC, —I 11456' 4 .0383 bpf,D=6.276' 1 #; 12662' H PUP JT w/RA TAG PERFORATION SUIVM4RY REF LOG:MWD on 02/22/16 i 14643' —'PUP JT w/RA TAG ANGLE AT TOP PERF:91°@ 14581' 1 Note:Refer to Roduction DB for historical perf datall SIZE SPF INTERVAL Opn/Sqz DATE 1 R1; 2-7/8" 6 14581-14791 0 02/26/16 1 . 2-7/8" 6 14841-15501 0 02/26/16 1 1 1 PBTD —{ 15760' i 1 1111114.44. X11111111111"/ 4-1/2'TBG,12.6#,13-CR HYD 521, —I 15853' .0152 bpf,D=3.958" DATE REV BY CONVENTS DATE REV BY CONVENTS PRUDHOE BAY UNIT 02/07/82 N18E ORIGINAL COMPLETION WELL: R 16A 10/25/91 D-16 RWO FERMI No:"1151850 02/28/16 P-273 ST(R-16A) API No: 50-029-20686-01 03/03/16 JM) DRLG HO CORRECTIONS SEC 32,T12N,R13E,1659'FSL 8 1711'FWL 03/09/16 NS/JMD ADONTL EDTTS 03/09/16 NS/JMD FINAL ODE APPROVAL BP Exploration(Alaska) • • BP AMERICA �� LOT I FIT Summary Well Name: R-16A Surface Leak Off Test Test Test Depth Test Depth AMW Pressure Pressure EMW Date Type (TMD-Ft) (TVD-Ft) (ppg) (psi) (BHP) (psi) (ppg) 02/12/16 FIT 11,456.00 8,823.80 8.50 605.00 4,501.23 9.82 Page 1 of 1 • North lrnenp A Pale 1 of 52 Operation Summary Report ' Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date 1/14/2016 End Date 2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12.00.00AM Rig Release:2/28/2016 Rig Contractor.PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual©65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) ' 1/14/2016 00:00 - 06:00 6.00 MOB P PRE DISCONNECT MODULES -ROTATE MUD MODULE TIRES TO SPLIT AND ROLL TO WARM UP HYDRAULICS -DISCONNECT UTILITY MODULE ELECTRICAL SPLIT MUD MODULE FROM DRILL MODULE SPLIT MODULES FOR MOVE TO R-16A SPLIT UTILITY MODULE FROM DRILL MODULE,TURN AND POSITION MUD MODULE AND STAGE AWAY FROM DRILL MODULE -MOVE DRILL MODULE OFF WELL. SPOT NEW DUMMY WELL HOUSE OVER R-16A 06:00 - 12:00 6.00 MOB P PRE MOVE MODULES FROM R-10A TO R-16A -REMOVE DUMMY WELL HOUSE WITH CRANE -ADJUST NEW DUMMY WELL HOUSE ON R-16A SO THAT WELLHEAD AND VALVES FIT 12:00 - 13:00 1.00 MOB P FIRE SPOT MODULES OVER WELL -PJSM WITH RIG CREW -MATE MUD MODULE AND UTILITY MODULE TO DRILL MODULE. -START CONNECTING INTERCONNECTS. 13:00 - 16:00 3.00 MOB P PRE CONNECT ELECTRICAL AND UTILITY INTERCONNECTS BETWEEN MODULES -CONNECT INTERCONNECTS BETWEEN THE UTILITY MODULE AND DRILL MODULE -CONNECT INTERCONNECTS BETWEEN THE DRILL MODULE AND MUD MODULE -CLEAN UP CARRIER BAYS,SWAP POWER TO HIGH LINE,SPOT CUTTINGS BOX, CONNECT STEAM.RIG UP PIPE SHED,WALK WAYS,AND WATER LINES. 16:00 - 16:30 0.50 MOB P PRE RAISE DERRICK WITH 496K OFF RACK -PJSM WITH RIG CREW PRIOR TO RAISING DERRICK AND PRIOR TO SKIDDING RIG FLOOR -PERFORM DERRICK INSPECTION -COMPLETE DERRICK PRE-RAISE CHECKLIST AND RAISE DERRICK 16:30 - 17:30 1.00 MOB P PRE SKID RIG FLOOR TO DRILLING POSITION -PJSM WITH RIG CREW. 17:30 - 23:00 5.50 MOB P PRE RIGGING UP -PJSM WITH RIG CREW -PIN MAN RIDERS,LOWER BLOCKS,UNPIN BRIDAL LINE,PIN BLOCKS TO TOP DRIVE, UNTIE SERVICE LOOPS,UNPIN FORUM CRANE,PIN TORQUE TUBE,INSTALL OFFLINE MOUSEHOLES,COMPLETE INTERCONNECT INSTALLATION. -TEST MUD LINE TO 3500PSI -TAKE SEAWATER TO PITS AND CALIBRATE TOTCO SENSORS **RIG ACCEPT ON 1/14/16 AT 23:00** Printed 3/28/2016 1.04 57PM *All depths reported in Drillers Depths* 11/ North America-ALASKA BP '4' /*,,, ,*age 2 of 52 Operation Summary Report : f Common Well Name R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253 00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UW:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 23:00 - 00:00 1.00 MOB P PRE RIG EVACUATION DRILL AND AAR.4 MINUTE 12 SECOND RESPONSE TIME. -PRE-SPUD MEETING WITH BOTH CREWS. 1/15/2016 00:00 - 02:00 2.00 RIGU P PRE PRESSURE TEST TWC. PJSM WITH RIG CREW -PRESSURE TEST THE TWC FROM ABOVE AND BELOW TO 250 PSI LOWAND 3500 PSI HIGH FOR 5 MINUTES EACH.PASSING TESTS. 02:00 - 02:30 0.50 RIGU P PRE RIG EVACUATION DRILL WITH ALL PERSONAL -4 MINUTE 35 SECOND RESPONSE TIME. AFTER ACTION REVIEW 02:30 - 05:00 2.50 RIGU P PRE NIPPLE DOWN TREE AND ADAPTER FLANGE PJSM WITH RIG CREWAND CAMERON ENSURING CAMERON HANDS UNDERSTOOD BP'S EXPECTATIONS,HAD UP TO DATE PROCEDURES,AND WERE EFFECTIVELY AND SAFELY LEADING BOTH THE PJSM AND THE.TASK -BLEED OFF TUBING HANGER VOID -CLEAN AND INSPECT TUBING HANGER AND LOCK DOWN SCREWS.NO VISUAL DAMAGE TO HANGER THREADS.PITTING AND _CORROSION NOTED IN RING GROOVE. -MAKE UP 4-1/2"BUTTRESS BY 4-1/2"IF XO TO TUBING HANGER.11 TURNS TO TIGHT BY HAND. SIMOPS: -C/O UPPER PIPE RAMS ON BOP STACK FROM 2-7/8"VBR TO 7"ON TEST STUMP -PERFORM DERRICK INSPECTION 05:00 - 10:00 5.00 BOPSUR P PRE NIPPLE UP BOP -PU UP 16'HIGH PRESSURE RISERS AND STAB ONTO TUBING SPOOL -TORQUE RISER BOLTS -PU BOP STACKAND SET ON HIGH PRESSURE RISER -INSTALL BELL NIPPLE AND AIR BOOT -TORQUE ALL FLANGES TO SPEC -TAKE RKB MEASUREMENTS -INSTALL MOUSEHOLE -MAKE UP EQUIPMENT FOR BOP TEST SIMOPS: -C/O SAVER SUB 10:00 - 12:00 2.00 BOPSUR P PRE RIG UP TO TEST BOP -FILL LINES AND MUD GAS SEPARATOR -BLEED AIR OUT OF LINES -BODY TEST ON BOPE AND CHECK FOR LEAKS Printed 3/28/2016 1:04:57PM `AII depths reported in Drillers Depths* • f; North America-ALASKA-BP f-r g f, Operation Summary Report ,r ;�, �` Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual©65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 19:00 7.00 BOPSUR P PRE PRESSURE TEST BOP -NOTIFIED STATE 24HRS PRIOR TO BOP TEST.WITNESS WAIVED BY AOGCC FIELD INSPECTOR CHUCK SCHEVE. -TEST BOP ACCORDING TO AOGCC,BP REGULATIONS,AND PARKER PROCEDURES -PRESSURE TEST BOP RAMS TO 250 PSI AND 3500 PSI FOR 5 MINUTES EACH TEST UPPER 7"RAMS WITH 7"TEST JOINT AND LOWER 2-7/8"X 5-1/2"VBRS WITH 4" AND 4-1/2"TEST JOINTS. ' PRESSURE TEST BOP ANNULAR PREVENTER TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 MINUTES EACH WITH 4"TEST JOINT. ALL TESTS CHARTED -LOWER[BOP TEST FAILED AND THE REST OF THE TESTS PASSED BP AND AOGCC CRITERIA 19:00 - 22:00 3.00 BOPSUR P PRE CHANGE OUT LOWER IBOP -CHANGE OUT LOWER IBOP -BLOW DOWN ALL MUD LINES RIG UP TO PUMP DOWN IA -OBTAIN PASSING LOWER IBOP TEST 22:00 - 22:30 0.50 RIGU P PRE RIG SERVICE -GREASE AND INSPECT ST-80,PS-21, TOPDRIVE 22:30 - 00:00 1.50 RIGU P PRE RIG UP TO PULL TWC -PJSM WITH RIG CREWAND DRILL SITE MAINTENANCE -PICK UP DUTCH RISER AND RUN IN LOCK DOWN SCREWS -RIG UP AND PRESSURE TEST LUBRICATOR TO 250 PSI AND 3500 PSI FOR 5 MINUTES EACH.(PASSING TEST) -RETRIEVE TWC -BLOW DOWN CHOKE AND KILL LINES -RIG DOWN LUBRICATOR -RIG DOWN DUTCH RISER 1/16/2016 00:00 - 01:00 1.00 WHSUR P DECOMP PULL TWC -RETRIEVE TWC -BLOW DOWN CHOKE AND KILL LINES -RIG DOWN LUBRICATOR -RIG DOWN DUTCH RISER 01:00 - 03:30 2.50 WHSUR P DECOMP CIRCULATE FREEZE PROTECT OUT OF TBG AND IA -R/U TO CIRCULATE BOTH WAYS -PUMP 50 BBLS DOWN IAAND DISPLACE DIESEL FREEZE PROTECT FROM TBG -5 BPM WITH 960 PSI -PUMP 200 BBLS DOWN TBG AND DISPLACE DIESEL FREEZE PROTECT FROM IA -9 BPM WITH 1310 PSI -MONITOR WELL 10 MIN:STATIC -BLOW DOWN LINES.RIG DOWN CIRCULATING EQUIPMENT 03:30 - 04:00 0.50 PULL P DECOMP RIG UP TO LAY DOWN 4-1/2"TDS TUBING AND HANGER -PJSM WITH SLB,CAMERON,DOYON AND RIG CREW -RIG UP SLB CONTROL LINE SPOOLER Printed 3/28/2016 1 04 57PM *All depths reported in Drillers Depths* • North America-ALASKA-BP/ ' Page 4 of 52 Operation Summary Report Common Well Name:R-16 1 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor.PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Descnption of Operations (hr) (usft) 04:00 - 05:30 1.50 PULL P DECOMP PULL TUBING HANGER -PJSM WITH RIG CREW,CAMERON,DOYON CASING,AND SCHLUMBERGER -MAKE UP LANDING JOINT -RIH TO TUBING HANGER AND ENGAGE HANGER WITH 11 TURNS AS PLANNED -BACK OUT TUBING HANGER LOCK DOWN -SCREWS UNSEAT HANGER WITH 110K.NO RESISTANCE PULLING HANGER.STRING WEIGHT AND BLOCK WEIGHT IS 110K. -MONITOR WELL FOR 10 MINUTES:STATIC -PULL HANGER TO RIG FLOOR 05:30 - 06:30 1.00 PULL P DECOMP CIRCULATE BOTTOMS UP 9 BPM,300 PSI -MONITOR WELL 10 MIN:WELL STATIC 06:30 - 15 30 9.00 PULL P DECOMP POH WITH 4-1/2"TDS TUBING ON ELEVATORS FROM 7,300'MD TO SURFACE -PJSM WITH DOYON CASING,SLB,AND RIG CREW -PU 70K,SO 70K AT 3,800' 186 JOINTS RECOVERED PLUS 2.47FT CUT JOINT 26 CLAMPS,AND 4 STAINLESS STEEL BANDS.CORRECT NUMBER PER RECORDS. -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 15:30 - 16:30 1.00 PULL P DECOMP RIG DOWN DOYON CASING AND SCHLUMBERGER SPOOLING EQUIPMENT -CLEAN AND CLEAR RIG FLOOR 16:30 - 19:30 3.00 WHIP P WEXIT RIG UP HALLIBURTON E-LINE PJSM WITH HALLIBURTON AND RIG CREW SPOT TRUCK AND MOVE TOOLS TO PIPESHED -HANG SHEAVES IN DERRICK AND ON TOPDRIVE -RIG UP E-LINE TOOLS 19:30 - 21:00 1.50 WHIP N HMAN 2,898.80 WEXIT RUN IN HOLE ON E-LINE WITH 8.4"GAUGE RING AND JUNK BASKET -PJSM WITH HALLIBURTON AND RIG CREW -UNABLE TO PASS 2,609'MD-DV COLLAR DEPTH WITH 8.4"GAUGE RING -POOH WITH 8.4"GAUGE RING -MONITOR WELL VIA TRIP TANK "SIMOPS:BUILD 4"STANDS OFFLINE" 21:00 - 23:30 2.50 WHIP P WEXIT RUN IN HOLE ON E-LINE WITH 8.3"GAUGE RING AND JUNK BASKET TO 7,197'MD -POOH AND LAY DOWN GAUGE RING AND JUNK BASKET. -MONITOR WELL VIA TRIP TANK 23:30 - 00:00 0.50 WHIP P WEXIT DAILY RIG SERVICE -LUBRICATE RIG.GREASE AND INSPECT ST-80,PS-21,AND TOPDRIVE. Printed 3/28/2016 1 04.57PM *All depths reported in Drillers Depths* North America-ALASKA-BP , Page 5 of 52 • Operation Summary Report! , Common Well Name.R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor.PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 1/17/2016 00:00 - 03:00 3.00 WHIP P WEXIT RUN IN HOLE ON E-LINE WITH EZSV AND SET -MAKE UP EZSV AND GR/CCL TO E-LINE -RUN IN HOLE WITH EZSV AND LOGGING COLLARS -POSITION AND SET EZSV WITH TOP AT 6,997'ELMD,AND BOTTOM AT 7,000'ELMD. EZSV BOTTOM 5'ABOVE COLLAR. -POH WITH E-LINE MONITOR WELL VIA TRIP TANK 03:00 - 04:00 1.00 WHIP P WEXIT. RIG DOWN E-LINE. -CLEAN AND CLEAR RIG FLOOR 04:00 - 06:30 2.50 WHIP P WEXIT PRESSURE TEST 9-5/8"CASING AND EZSV -250 PSI FOR 5 MIN AND 3500 PSI FOR 30 MIN -CHARTED AND PASSING TEST 7 BBLS TO PRESSURE UP AND 7 BBLS BLEED BACK -RECEIVED APPROVAL TO PROCEED FROM 1 WTL:RICH BURNETT 06:30 - 09:00 2.50 WHSUR C WEXIT NIPPLE DOWN BOP AND RISER BLOW DOWN LINES -LID MOUSE HOLE -N/D BOP STACK AND RACK BACK ON STUMP N/D SPACER SPOOLS AND L/D TO PIPE SHED. SIMOPS:BUILD 4"DP STANDS OFFLINE 09:00 - 17:00 8.00 WHSUR C WEXIT CHANGE OUT TUBING SPOOLAND TEST 9-5/8"PACKOFF -CHANGE OUT TUBING SPOOLAND INSTALL NEW PER CAMERON REP -TEST 9-5/8"PACKOFF PER CAMERON- GOOD TEST SIMOPS:BUILD 4"DP AND 5"HWDP STANDS OFFLINE 17:00 - 19:30 2.50 BOPSUR C WEXIT NIPPLE UP BOP AND RISER -N/U RISER AND BOP -SET TEST PLUG PER CAMERON 19:30 - 20:30 1.00 BOPSUR C WEXIT BODY TEST BOP AND RISER -250 PSI FOR 5 MIN AND 3500 PSI FOR 5 MIN -CHARTED AND PASSING TEST 20:30 - 21:00 0.50 BOPSUR P WEXIT PULL TEST PLUG AND INSTALL WEAR RING PER CAMERON 21:00 - 23:30 2.50 WHIP P WEXIT PICKUP WHIPSTOCK BHAAS PER BAKER REP -M/U ANCHOR,GEN II WHIPSTOCK,WINDOW MILL,(3)WATERMELON MILLS -SCRIBE WHIPSTOCK TO MWD TOOL -RIH WITH 6-1/4"DC'S AND 5"HWDP -BHA WT=P/U45KS/O=45K SIMOPS:TEST NEWANNULUS VALVES WITH DSM 23:30 - 00:00 0.50 WHIP P WEXIT RIG SERVICE -LUBRICATE RIG,SERVICE RIG,GREASE WASH PIPE,ST-80,PS-21,INSPECT ALL RIGGING Printed 3/28/2016 1 04 57PM *All depths reported in Drillers Depths* hCorth America ALASKA-BP �. �h,,,, � Operation Summary Report f;'. , F Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT I NPT Depth Phase Description of Operations (hr) (usft) 1/18/2016 00:00 - 01:00 1.00 STWHIP P WEXIT RIH WITH WHIPSTOCK BHA FROM 400'MD TO 950'MD -M/U 6-1/4"DRILL COLLARS AND 5"HWDP -P/U=85K,S/O=85K -MONITOR DISPLACEMENT ON TRIP TANK: PROPER DISPLACEMENT 01:00 - 05:30 4.50 STWHIP P WEXIT RIH WITH WHIPSTOCK BHA ON ELEVATORS -FROM 950'MD TO 6,900'MD RIH AT 70 FT/MIN -FILL PIPE EVERY 20 STANDS -SHALLOW TEST MWD AT 1,500'MD(GOOD SIGNAL) -PU 155K,SO 125K AT 6,900 -MUD WEIGHT:9.7 PPG IN,9.7 PPG OUT MONITOR DISPLACEMENT ON TRIP TANK: PROPER DISPLACEMENT 05:30 - 06:30 1.00 STWHIP P WEXIT TAG EZSV,SET WHIPSTOCK ANCHOR,AND SHEAR OFF MILLING ASSEMBLY -ESTABLISH CIRCUATION AT 500 GPM,1685 PSI -ORIENT WHIPSTOCK 45 RIGHT -TAG EZSV AT7,011'MD -PER BAKER REP.SET ANCHOR WITH 16K. PICK UP 10K OVER TO CONFIRM SET.SHEAR 8-1/2"MILLS OFF WHIPSTOCK SLIDE WITH 46K. 06:30 08:00 1.50 STWHIP P WEXIT DISPLACE WELLBORE FROM 8.5PPG SEAWATER TO 9.7PPG LSND MILLING FLUID -OBTAIN SPR AT 6,900'MD(5,816'TVD)MUD WEIGHT 9.7PPG 08:00 - 16:30 8.50 STWHIP P WEXIT MILL 8-1/2"WINDOWAND KICK OFF R-16A SIDETRACK -MILL WINDOW IN 9-5/8"CASING WITH 8-1/2" MILLING ASSEMBLY -500 GPM,1530 PSI ON,1470 PSI OFF -100 RPM,BK TORQUE ON,4K TORQUE OFF -PU 150K,SO 125K,ROT 135K -PUMP HIGH VIS-SWEEPS WHILE MILLING -SMALL QUANTITIES OF CEMENT OBSERVED WHILE MILLING WINDOW -METAL CUTTINGS TO SURFACE OBSERVED -MUD WEIGHT:9.7 PPG IN,9.7 PPG OUT -TOP OF WINDOW:6,990'MD -MIDDLE OF WINDOW:6,998'MD -BOTTOM OF WINDOW 7,007'MD 16:30 - 18:30 2.00 STWHIP P WEXIT WORK MILLS THROUGH WINDOW -CIRCULATE 600 GPM,1933 -PUMP HI-VIS SUPER SWEEP ON BOTTOM 1630 PSI,500 GPM -WORK MILLS THROUGH WINDOW WITH PUMP AND ROTATION. -WORK THROUGH WINDOW WITH PUMPS AND NO ROTATION -WORK THROUGH WINDOW WITH NO ROTATION AND NO PUMPS Printed 3/28/2016 1 04 57PM *AII depths reported in Drillers Depths* r • North Arnenca-ALASKA-BP cage 7 of 52 r+. Operation Summary Report Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UW:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:30 - 23:30 5.00 STWHIP P WEXIT PULL OUT OF HOLE WITH 8-1/2"MILLING ASSEMBLY FROM 6,970'MD TO 2000'MD -PUMP OUT OF HOLE DUE TO 10K OVERPULL FROM 6,970'MD TO 6,080'MD.129 GPM,330 PSI -PUMP 30 BBL HI-VIS SUPER SWEEP AT 6,086'MD.1322 PSI,500 GPM. CONSISTENT SMALL QUANTITIES OF METAL CUTTINGS SEEN AT SURFACE. PULL OUT OF HOLE ON ELEVATORS FROM 6,080;MD TO 2000'MD. -PU 96K,SO 96K AT 2000'MD -MUD WEIGHT:9.7 PPG IN,9.7 PPG OUT 23:30 - 00:00 0.50 STWHIP P WEXIT DAILY RIG SERVICE -LUBRICATE RIG.CHANGE DIES IN ST-80. GREASE AND INSPECT ST-80,PS-21,AND TOP DRIVE. 1/19/2016 00:00 - 00:30 0.50 STWHIP P WEXIT POH ON ELEVATORS WITH 8-1/2"MILLING BHA FROM 2,000'MD TO 1000'MD -PU 85K,SO 85K AT 1,000'MD MONITOR HOLE FILL WITH TRIPTANK: PROPER DISPLACEMENT MONITOR WELL 10 MINUTES PRIOR TO PULLING BHA THROUGH STACK:STATIC 00:30 - 03:00 2.50 STWHIP P WEXWT LAY DOWN 8-1/2"MILLING BHA FROM 1,000' MD -PJSM WITH RIG CREW,SLB DD,AND BAKER REP -RACK BACK 5"HWDP IN DERRICK AND LAY DOWN 6-1/4"DRILL COLLARS -LAY DOWN MILLS PER BAKER REP -BOTTOM MILL:IN GAUGE -UPPER MILL:IN GAUGE -CLEAN AND CLEAR RIG FLOOR -MONITOR WELL VIA TRIP TANK PROPER DISPLACEMENT 03:00 - 03:30 0.50 CLEAN P WEXIT JET BOP AND WELLHEAD TO REMOVE METAL SHAVINGS -PJSM WITH RIG CREW -MAKE UP STACK JETTING TOOL -FUNCTION ALL STACK COMPONENTS -JET STACKAND WELLHEAD -CLEAN AND CLEAR RIG FLOOR 03:30 - 04:00 0.50 DRILL P WEXIT PERFORM WEEKLY BOPE FUNCTION TEST -FUNCTION ANNULAR,UPPER 7"PIPE RAMS, LOWER 2-7/8"X 5-1/2"VBRS, AND HCR CHOKE AND KILL. 04:00 - 06:30 2.50 DRILL P WEXIT MAKE UP 8-1/2"PDX6 DRILLING BHA TO 738' MD -PJSM WITH RIG CREW AND SLB DD/MWD -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 06:30 - 10:30 4.00 DRILL P WEXIT RIH WITH 8-1/2"PDX6 DRILLING BHA FROM 738'MD TO 6,900'MD -PU 145K,SO 120K -FILL PIPE EVERY 20 STANDS AND CIRCULATE 5 MINUTES -MUD WEIGHT:9.7PPG IN,9.7PPG OUT -MONITOR DISPLACEMENT VIA TRIP TANK STATIC Printed 3/28/2016 1 04 57PM *AII depths reported in Drillers Depths* :::;::::: :: 'i �, " r Common Well Name:R-16 1AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10 30 - 11:00 0.50 DRILL P WEXIT RIH WITH 8-1/2"PDX6 DRILLING BHA TO BOTTOM AT 7026'MD -ESTABLISH CIRCULATION AT FULL DRILLING RATE AND OBTAIN BENCHMARK ECD OF 10.17PPG -595 GPM,2450 PSI -120 RPM,4K TORQUE OBTAIN SPRS AT 6,990'MD(5,830'TVD),9.7 PPG MW WITHOUT PUMPS OR ROTATION WORK THROUGH WINDOW TO BOTTOM.NO DRAG OBSERVED. 11:00 - 19:00 8.00 DRILL P INTI DRILL 8-1/2"INTERMEDIATE HOLE FROM 7,026'MD TO 7,141'MD -590 GPM,2640 PSI ON,2560 PSI OFF -80 RPM,6K TORQUE ON,6K TORUE OFF -PU 151K,SO 120K,ROT 129K AT 7,141'MD -ECD:ACTUAL=10.28 PPG,CALC=10.14 PPG -SURVEY EVERY 30FT ACTUAL ROTATE TIME:5.05 HRS -ACTUAL JAR TIME:5.05 HRS -MUD WEIGHT:9.7 PPG IN,9.7 PPG OUT BIT NOT TAKING WEIGHT AND INCLINATION TRACKING CASING. -ATTEMPT TIME DRILL TO DEPART FROM CASING -DISCUSSED WITH ODE.BHA LIKELY TRACKING CASING.DECISION MADE TO POOH FOR MOTOR AND MILL TOOTH BIT. 19:00 - 20:00 1.00 DRILL N DPRB 7,141.00 INTI POH WITH 8-1/2"PDX6 DRILLING BHA FROM 7,141'MD TO 6,415'MD -MONITOR WELL FOR 10 MINUTES PRIOR TO PULLING OFF BOTTOM:STATIC PU 145K,SO 118K AT 7,080'MD -MUD WEIGHT:9.7 PPG IN,9.7 PPG OUT -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 20:00 - 20:30 0.50 DRILL N DPRB 7,141.00 INTI PUMP 20 BBL 10.7 PPG DRY JOB -4 BPM,400 PSI 20:30 - 23:00 2.50 DRILL N DPRB 7,141.00 INTI POH WITH 8-1/2"PDX6 DRILLING BHA FROM 6,415'MD TO 745'MD -PU 77K,SO 77K AT 745'MD -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 23:00 - 23:30 0.50 DRILL N DPRB 7,141.00 INTI LAY DOWN 8-1/2"PDX6 DRILLING BHA FROM 745'MD -MONITOR WELL FOR 10 MINUTES PRIOR TO PULLING BHA THROUGH STACK:STATIC -PJSM WITH RIG CREW AND SLB DD/MWD -PU 77K,SO 77KAT 745'MD -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 23:30 - 00:00 0.50 DRILL P INTI DAILY RIG SERVICE -LUBRICATE RIG.GREASE AND INSPECT ST-80,PS-21,TOPDRIVE.INSPECT RIGGING. Printed 3/28/2016 1:04:57PM *AII depths reported in Drillers Depths* 5 • North America ALASKA BP ;F fof 52 s Operation Summary Report Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date: 1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Firs Task Code NPT NPT Depth '! Phase Description of Operations (hr) (usft) 1/20/2016 00:00 - 01:30 1.50 DRILL N DPRB 7,141.00 ` INT1 CONTINUE LAY DOWN DRILLING BHA#2 8-1/2" PDX6 -MONITOR WELL FOR 10 MINUTES PRIOR TO PULLING BHA THROUGH STACK:STATIC -PJSM WITH RIG CREWAND SLB DD/MWD -PU 77K,SO 77K AT 745'MD -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 01:30 - 03:00 1.50 DRILL N DPRB 7,141.0E INTI MAKE UP BHA#38-1/2"MILL TOOTH WITH 1.83 DEG MOTOR TO 750'MD -PJSM WITH RIG CREWAND SLB DD/MWD PU 72K,SO 72K AT 750'MD MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 03:00 - 07:30 4.50 DRILL N DPRB 7,t41.00 INTI RIH ON ELEVATORS WITH BHA#3 FROM 750' MD TO 6,990'MD -SHALLOW HOLE TEST MWD TOOLS AT 1700' MD -PU 142K,SO 142K -MUD WEIGHT:9.7 PPG IN,9.7 PPG OUT MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 07:30 - 10:00 2.50 DRILL N DPRB 7,141:00 INTI EXIT WINDOW TO TD AND TRENCH FOR TIME DRILL TO ENSURE SEPARATION FROM CASING -OBTAIN SPRS AND ORIENT MOTOR 45R PRIOR TO EXITING WINDOW -RIH ON ELEVATORS TO 7,141'MD AND CONFIRM BOTTOM WITH 10K ORIENT MOTOR TO 145R -BEGIN TRENCHING FROM 7,141 TO 7,116' MD TRENCH SEQUENCE -25 FT AT 50 FT/HR -20 FT AT 50 FT/HR -15 FT AT 30 FT/HR -10 FT AT 30 FT/HR -5 FT AT 20 FT/HR -550 GPM,2015 PSI ON,1950 PSI OFF -ACTUAL TOUR SLIDE TIME:2.72 HRS -TOTAL TOUR BIT TIME:2.72 HRS -MUD WEIGHT:9.7 PPG IN,9.7 PPG OUT -SPR AT 6,975'MD(5,850')WITH 9.7 PPG MW 10:00 - 20:00 10.00 DRILL N DPRB 7,141.00 INTI TIME DRILL FROM 7,141'MD TO 7,155'MD DRILLING SEQUENCE -4 FT/HR FROM 7,141'MD TO 7,155'MD -8 FT/HR FROM 7,155'MD TO 7,171'MD -15 FT/HR FROM 7,171'MD TO 7,209'MD -550 GPM,1990 PSI ON,1970 PSI OFF -PU 148K,SO 120K -MUD WEIGHT:9.7 PPG IN,9.7 PPG OUT SIMOPS:BUILD 4"STANDS OFFLINE Printed 3/28/2016 1 04 57PM *All depths reported in Drillers Depths' 1 North America ALASFfR � 'I age'� of 52 .r Operation Summary Report ,,� �, Common Well Name.R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:00 - 23:30 3.50 DRILL P INTI DRILL 8-1/2"INTERMEDIATE HOLE FROM 7,209'MD TO 7,351'MD -4 DEG DROP IN INCLINATION FROM 9-5/8" CASING INDICATES SEPARATION FROM CASING.BEGIN DRILLING AHEAD. -550 GPM,2207 PSI ON,2100 PSI OFF -30 RPM,5K TORQUE ON,4K TORQUE OFF -PU 145K,SO 123K,ROT 130K AT 7,351'MD -SURVEY EVERY 30 FT -BACKREAM 15 FT PRIOR TO CONNECTIONS -MUD WEIGHT:9.7 PPG IN,9.7 PPG OUT -TOUR ROTATE TIME:0.67 HR -TOUR SLIDE TIME:8.19 HR 23:30 - 00:00 0.50 DRILL P INTI DAILY RIG SERVICE LUBRICATE RIG.GREASE WASHPIPE,ST-80, PS-21,TOPDRIVE 1/21/2016 00:00 - 05:00 5.00 DRILL P INTI DRILL 8-1/2"INTERMEDIATE HOLE FROM 7,351'MD TO 7,642'MD -600 GPM,2660 PSI ON,2525 PSI OFF -30-80 RPM,6K TORQUE ON,4K TORQUE OFF -PU 149K,SO 122K,ROT 130K -SURVEY EVERY 30-90FT BACKREAM 15FT PRIOR TO CONNECTIONS MUD WEIGHT:9.7 PPG IN,9.7 PPG OUT -SLIDE TIME:0.05 HRS -ROTATE TIME:3.73 HRS -TOTAL BIT TIME:15.31 HRS OBTAIN SPRS AT 7,642'MD(6,230'TVD)MW 9.7 05:00 - 06:00 1.00 DRILL P INTI CONDITION MUD AND CIRCULATE BOTTOMS UP -600 GPM,2520 PSI -80 RPM WITH 4K TORQUE -WORK PIPE FULL STAND -MONITOR WELL 10 MIN:STATIC 06:00 - 09:00 3.00 DRILL P INTI RUN GYRO SURVEY -RIG UP E-LINE -RUN GYRO IN HOLE TAKING CHECK SHOTS EVERY 2,000 FT -RUN GYRO IN OPEN HOLE RECORDING SURVEYS EVERY 1 FT -PULL OUT OF HOLE WITH GYRO TAKING CHECK SHOTS EVERY 2,000 FT(1000 FT OFFSET FROM INITIAL CHECK SHOTS) -RIG DOWN E-LINE 09:00 - 10:30 1.50 DRILL N DPRB 7,141.00 INTI BACKREAM WITH 1.83 DEG MOTOR AND MILL TOOTH BIT FROM 7,642'MD TO 7,070'MD TO CLEAN UP HIGH DOG LEGS. -600 GPM,2500 PSI -40 RPM,5K TORQUE -PU 145K,SO 122K -MONITOR WELL 10 MIN:STATIC -PUMP DRY JOB 10:30 - 13:30 3.00 DRILL N DPRB 7,141.00 INTI PULL OUT OF HOLE ON ELEVATORS FROM 6,990'MD TO 740'MD -PU 72K,SO 72KAT 740'MD -MUD WEIGHT:9.7 PPG IN,9.7 PPG OUT -MONITOR WELL VIA TRIPTANK:PROPER DISPLACEMENT Printed 3/28/2016 1.04.57PM *AII depths reported in Drillers Depths* North America-ALASKA Operation Summary Report ----- ---- ------ Common Well Name R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/me:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual©65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:30 - 14:30 1.00 DRILL N DPRB 7,141.00 INTI LAY DOWN 1.83 DEG MOTOR BHA#3 FROM 740'MD -PJSM WITH RIG CREW,SLB DD/MWD -MONITOR WELL 10 MINUTES PRIOR TO PULLING NON-SHEARABLES THROUGH STACK:STATIC -MONITOR WELL VIA TRIPTANK:PROPER `DISPLACEMENT 14:30 - 17:00 2.50 DRILL N HMAN 7,642.00' INTI SAFETY STAND DOWN FOR INCIDENT INVESTIGATION -SECURE WELL WITH SAFETY JOINT ACROSS STACK AND FULL OPEN SAFETY VALVE. -AFTER ACTION REVIEW OF INCIDENT WITH RIG CREW -MONITOR WELL VIA TRIP TANK.PROPER DISPLACEMENT 17:00 - 17:30 0.50 DRILL P INTI DAILY RIG SERVICE -LUBRICATE RIG.GREASE AND INSPECT ST-80,PS-21. 17:30 - 19:00 1.50 DRILL N DPRB 7,642.00 INTI CONTINUE LAY DOWN 1.83 DEG MOTOR BHA #3 -MONITOR WELL VIA TRIPTANK:PROPER DISPLACEMENT 19:00 - 21:00 2.00 DRILL N DPRB 7,642.00 INTI, PICK UP BHA#4 PDX6 RSS WITH PDC BIT TO 738'MD -PJSM WITH RIG CREWAND SLB DD/MWD -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 21:00 - 22:00 1.00 DRILL N DPRB 7,642.00 INTI RUN IN HOLE WITH BHA#4 PDX6 RSS TO 1,660'MD -PERFORM SHALLOW HOLE TEST AT 1,660' MD:FAIL.INCORRECT MWD DATA LOADED IN TOOL. -MONITOR WELL VIA TRIPTANK:PROPER DISPLACEMENT 22:00 - 00:00 2.00 DRILL N HMAN 7,642.00 INTI POOH AND LAY DOWN BHA#4 PDX6 RSS FROM 1,660'MD -PJSM WITH RIG CREW AND SLB DD/MWD -MONITOR WELL 10 MINUTES PRIOR TO PULLING NON-SHEARABLES THROUGH STACK:STATIC -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 1/22/2016 00:00 - 01:00 1.00 DRILL N HMAN 7,642.00 INTI LOAD DATA INTO MWD PER SLB DD/MWD 01:00 - 02:00 1.00 DRILL N HMAN 7,642.00 INTI MAKE UP PDX6 RSS BHA#4 FROM SURFACE AND RUN IN HOLE TO 1,500'MD -PJSM WITH RIG CREWAND SLB DD/MWD -PU 70K,SO 70K AT 738'MD -SHALLOW HOLE TEST MWD:PASS -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 02:00 - 06:00 4.00 DRILL N DPRB 7,141.00 INTI RUN IN HOLE ON ELEVATORS WITH PDX6 RSS BHA#4 FROM 1,500'MD TO ABOVE WINDOW AT 6,893'MD -PU 145K,SO 145KAT 6,893'MD -MUD WEIGHT:9.8 PPG IN,9.8 PPG OUT -FILL PIPE EVERY 20 STANDS AND CIRCULATE AT 550 GPM AND 20 RPM -MONITOR DISPLACEMENT VIA TRIPTANK PROPER DISPLACEMENT Printed 3/28/2016 1 04 57PM `AII depths reported in Drillers Depths* North America-ALASKA-BP ;,;(;4/ i 4 44 Operation Summary Report Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 07:00 1.00 DRILL P INTI SLIP AND CUT DRILLING LINE -PJSM -CALIBRATE AMPHION SYSTEM,SLB DEPTH TRACKING TOOLS,AND CHECK COMMUNICATIONS 07:00 - 08:00 1.00 DRILL N HMAN 7,642.00 INTI SAFETY STAND DOWN -AFTER ACTION REVIEW OF PRIOR DAYS INCIDENT WITH NIGHT RIG CREW. MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 08:00 - 10:00 2.00 DRILL N DPRB 7,141.00 INTI RUN INTO OPEN HOLE WITH PDX6 RSS FROM 6,893"MD TO 7,642'MD PU 150K,SO 117KAT 7,556'MD -FROM 7,556,WASH TO BOTTOM TAGGING AT 7,643'MD -OBTAIN SPRS AT 6,230'MD WITH 9.8 PPG MW 10:00 - 23:30 13.50 DRILL P INTI DRILL 8-1/2"INTERMEDIATE HOLE WITH PDX6 RSS FROM 7,643'MD TO 9,194'MD -600 GPM,3533 PSI ON,3490 PSI OFF -140 RPM,9K TORQUE ON,5K TORQUE OFF PU 163K,SO 128K,ROT 137KAT9,194'MD -ECD:11.49 PPG ACTUAL,11.07 PPG CALCULATED -SURVEY EVERY 90 FT -ACTUAL ROTATE TIME:9.74 HRS TOTAL BIT TIME:9.74 HRS 23:30 - 00:00 0.50 DRILL P INTI DAILY RIG SERVICE -LUBRICATE RIG.GREASE AND INSPECT PS-21,ST-80,RIG TONGS,TOP DRIVE 1/23/2016 00:00 - 01:00 1.00 DRILL P INTI DRILL 8-1/2"INTERMEDIATE HOLE WITH PDX6 RSS BHA#4 FROM 9,194'MD TO 9,243'MD -550 GPM,3350 ON,3301 OFF -PU 140K,SO 128K,ROT 137K AT 9,238'MD -BACKREAM 30 FT PRIOR TO CONNECTIONS -SURVEY EVERY 90 FT -ECD:11.51 PPG ACTUAL,11.27 PPG CALC -ACTUAL ROTATE TIME:0.69 HRS -TOTAL BIT TIME:10.43 HRS -MUD WEIGHT:10.4 PPG IN,10.4 PPG OUT -OBTAIN SPRS AT 9,243'MD(7,037'TVD WITH 10.4 PPG MUD WEIGHT 01:00 - 02:30 1.50 DRILL N DPRB 9,243.00 INTI BHA STALLED WITH GHOST REAMER AT WINDOWAND BIT ON BOTTOM -ATTEMPT TO WORK AT VARYING RPMS AND FLOW RATES.REPEATEDLY PICK UP AND SLACK OFF. 02:30 - 03:00 0.50 DRILL N DPRB 9,243.00 INTI PULL OUT OF HOLE ON ELEVATORS IN OPEN HOLE WITH PDX6 BHA#4 TO LAY DOWN GHOST REAMER FROM 9,243'MD TO 8,300' MD -MONITOR WELL 10 MINUTES:STATIC -PU 162K,SO 145KAT 9,150'MD -MUD WEIGHT:10.4 PPG IN,10.4 PPG OUT -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT Printed 3/28/2016 1.04.57PM *All depths reported in Drillers Depths* • North America-ALASKA-BP. % Operation Summary Report , Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253 00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/me:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 06:00 3.00 DRILL N DPRB 9,243.00 INTI BACKREAM OUT OF HOLE FROM 8,300'MD TO 7,652'MD -WHILE TRIPPING PICK UP WEIGHTS SLOWLY INCREASING TO 10K OVER AND SIGNS OF SWABBING OBSERVED. -550 GPM,3100 PSI -100 RPM,5-6K TORQUE -PU 160K,SO 113K,ROT 122KAT 7,652'MD 06:00 - 08:00 2.00 DRILL P INTIMAD PASS FROM 7,315'MD TO 7,005'MD -700 FT/MIN -PU 148K,SO 115KAT 7,005'MD -450'GPM,2300 PSI -MONITOR WELL 10 MINUTES AT SHOE: STATIC 08:00 - 08:30 0.50 DRILL P INTI DAILY RIG SERVICE -LUBRICATE RIG.SERVICE TOP DRIVE. CHANGE OUT SENSOR ON TOP DRIVE. 08:30 - 11:30 3.00 DRILL N DPRB 7,149.00 INTI POH ON ELEVATORS IN CASED HOLE AT 150 FT/MIN FROM 6,990'MD TO 2,352'MD PU 95K,SO 95K AT 2,352'MD MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT -LAY DOWN GHOST REAMER 11:30 - 12:00 0.50__. DRILt N DPRB 7,149.00 INTI _CIRCULATE AND CONDITION MUD -500 GPM,1460 PSI -SHALLOW HOLE TEST MWD TOOLS PRIOR TO TRIP IN HOLE 12:00 - 17:00 5.00 DRILL _ N DPRB 7,149.00 INTI RUN IN HOLE WITH PDX6 RSS BHA#4B FROM 2,352'MD TO 9,141'MD -PJSM -FILL PIPE EVERY 20 STANDS AND CIRCULATE TIGHT SPOT AT 7,146'MD 10-15K TO GET THROUGH WINDOW 17:00 - 00:00 7.00 DRILL P INTI DRILL 8-1/2"INTERMEDIATE HOLE WITH BHA #4B FROM 9,243'MD TO 9,627'MD -550 GPM,3630 PSI ON,3600 PSI OFF -100 RPM,7K TORQUE ON,5K TORQUE OFF -PU 149K,SO 130K,ROT 136K AT 9,627'MD -ECD:11.24 PPG CALC,11.4 PPG ACTUAL -SURVEY EVERY 30 FT -ACTUAL ROTATE TIME:4.94 HRS -TOTAL BIT TIME:15.37 HRS -MUD WEIGHT:10.4 PPG IN,10.5 PPG OUT Printed 3/28/2016 1:04:57PM 'All depths reported in Drillers Depths* ' North l'irtef�iCa=ALASKA BP 'Page 14 of 52 ' Operation Summary Report Common Well Name.R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 1/24/2016 00:00 - 12:00 12.00 DRILL P INTI DRILL 8-1/2"INTERMEDIATE HOLE WITH BHA #4B FROM 9,627'MD TO 10,287'MD -550 GPM,3844 PSI ON,3800 PSI OFF -180 RPM,9K TORQUE ON,6K TORQUE OFF -PU 186K,SO 144,ROT 154 AT 10,287'MD -ECD:11.53 PPG ACTUAL,11.22 PPG CALCULATED SURVEY EVERY 90 FT -TOUR ROTATE TIME:9.46 HRS -TOTAL BIT TIME:24.84 HRS -BACKREAM 30 FT PRIOR TO CONNECTIONS -PUMP 20 B8L WEIGHTED SWEEP 1 PPG OVER MWAT 9,725'MD:15%INCREASE IN CUTTINGS -PUMP 20 BBL WEIGHTED SWEEP 2 PPG OVER MWAT 10,287'MD:10%INCREASE IN CUTTINGS -MUD WEIGHT:10.4 PPG IN,10.5 PPG OUT -OBTAIN SPRS AT 10,002'MD(7,634'TVD)AT 10.4 PPG MUD WEIGHT 12:00 - 23:30 11.50 DRILL P INTI DRILL 8-1/2"INTERMEDIATE HOLE WITH BHA #46 FROM 10,287'MD TO 11,136'MD -550 GPM,4010 PSI ON,4000 PSI OFF 120 RPM,12K TORQUE ON,8K TORQUE OFF -PU 208K,SO 148K,ROT 164 AT 11,136'MD -ECD:11.35 PPG ACTUAL,11.19 PPG CALCULATED -SURVEY EVERY 90 FT -TOUR ROTATE TIME:10.17 HRS -TOTAL BIT TIME:34.57 HRS -BACKREAM 30 FT PRIOR TO CONNECTIONS -PUMP 20 BBL HI-VIS SWEEP AT 11,050'MD: 10%INCREASE IN CUTTINGS -MUD WEIGHT:10.4 PPG IN,10.4 PPG OUT -OBTAIN SPRS AT 10,940'MD(8,399'ND)AT 10.4 PPG MUD WEIGHT 23:30 - 00:00 0.50 DRILL P INTI DAILY RIG SERVICE -LUBRICATE RIG.GREASE AND INSPECT PS-21,ST-80,TOPDRIVE.INSPECTALL RIGGING. Printed 3/28/2016 1:04.57PM *All depths reported in Drillers Depths* North America-ALASKA BFB Page 15 of 52 Operation Summary Report „ ,x Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253 00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No..PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 1/25/2016 00:00 - 06:00 6.00 DRILL P INTI DRILL 8-1/2”INTERMEDIATE HOLE WITH BHA #4B FROM 11,136'MD TO 11,458'MD -550 GPM,3970 PSI ON,3950 PSI OFF -120 RPM,12K TORQUE ON,10K TORQUE OFF -PU 228K,SO 150K,ROT 166 AT 11,148'MD ECD:11.33 PPG ACTUAL,11.19 PPG CALCULATED -SURVEY EVERY 90 FT BACKREAM 30 FT PRIOR TO CONNECTIONS -TOUR ROTATE TIME:3.32 HOURS -TOTAL BIT TIME:38.73 HRS -MUD WEIGHT:10.4 PPG IN,10.4 PPG OUT OBTAIN SPRS AT 11,458'MD(8,823'TVD)AT 10.4 PPG -IDENTIFIED TJB ON GAMMA RAY AT 11,236' MD 5'TVD BELOW PROJECTED.NO SIGNIFICANT DRILLING BREAK. -INITIATE CONTROL DRILLAT 11,320'MD WITH FULL STAND -DRILLING BREAK AT 11,453'MD -TD IN SAG RIVER AT 11,458'MD.CONFIRM SAG RIVER SAND AND GLAUCONITE IN SAMPLES. 06:00 - 08:30 2.50 DRILL P INTI CIRCULATE 3 TIMES BOTTOMS UP -548 GPM,3965 PSI -180 RPM,10-14K TORQUE 08:30 - 10:30 2.00 DRILL ' P INTI PUMP OUT OF HOLE FROM 11,458'MD TO 10,187'MD -2 BPM,265 PSI -MAX SPEED 80 FT/MIN I-MONITOR WELL 10 MINUTES:STATIC -MUD WEIGHT:10.4 PPG IN,10.45 PPG OUT -PU 228K,SO 150KAT 11,458'MD -AT 10,187'MD UP WEIGHT INCREASING 15K 10:30 - 12:00 1.50 DRILL P INTI BACKREAM OUT OF HOLE FROM 10,187'MD TO 9,935'MD -550 GPM,3750 PSI AT 9,970'MD -120 RPM,11K TORQUE,146K ROTATING WEIGHT -PU 209K,SO 128KAT 9,935'MD -MUD WEIGHT 10.4 PPG IN,10.5 PPG OUT 12:00 - 23:30 11.50 DRILL P INTI BACKREAM OUT OF HOLE FROM 9,935'MD TO 8,304'MD -550 GPM,3500 PSI -120 RPM,9K TORQUE AT 9,000'MD -PU 127K,SO 120K 123KAT 9,000'MD -MUD WEIGHT 10.4 PPG IN,10.5 PPG OUT -PUMP LO-VIS/HI-VIS SWEEP AT 8,500'MD WITH 15%INCREASE IN RETURNS FROM LOWAND 5%RETURNS FROM HIGH. 23.30 - 00:00 0.50 DRILL P INTI DAILY RIG SERVICE -LUBRICATE RIG.GREASE TOP DRIVE,ST-80, PS-21. 1/26/2016 00:00 - 10 00 10.00 DRILL P INTI BACKREAM OUT OF HOLE FROM 8,304'MD TO 7,470'MD -550-600 GPM,3340-3800 PSI -120 RPM,9-12K TORQUE -PU 160K,SO 114K,ROT 125-145K©8304'MD -MUD WEIGHT 10.4 PPG IN,10.5 PPG OUT Printed 3/28/2016 1 04:57PM *AII depths reported in Drillers Depths* • North America ALASKA-BP Page 16 of 52 t AfelOOKORMO Operation Summary Report Common Well Name.R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 'X3-017HY-C:(8,196,253 00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/me:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 12:00 2.00 DRILL P INTI POOH ON ELEVATORS F/7510'MD T/7250'MD -RIH 1 STAND AND PUMP LOW/HIGH VIS SWEEP @ 7688'MD W/10%INCREASE IN CUTTINGS -PUMP OUT OF HOLE @ 7530'MD T/7510'MD -POOH ON ELEVATORS F/7510'MD T/ 7250'MD,NOTICE 20K OVERPULL EVERY 30', ASSUME TJ HANGING UP AT WINDOW -WORK THROUGH OVERPULLS WHERE NEEDED,PUMP 300GPM,1057PSI @ 40 RPM -SMALL WASH OUT NOTICED ON STAND 69 TJ,ONCE FULL JOINT WAS WORKED ABOVE THE ROTARY DAMAGED JOINTS LAVED DOWN, REPORTED IN TRACTION IR-5184814 AS INFORMATION ONLY,NO REQURED ACTION ITEMS OA PRESSURE=150PSI @ 12:00PM MW IN=10 4PPG,MW OUT=10.5PPG LOSSES F/TOUR=OBBLS 12:00 - 12:30 0.50 DRILL P INTI BACKREAM OUT OF THE HOLE F/7250'MD T/ 7140'MD -300GPM,1065PSI @ 80 RPM,10-16K TQ, -125-145K ROT WT -OBSERVE OVERPULL EVERY 30',ASSUME TJ HANGING UP AT WINDOW -PU WT 169K,SOW 112K,@ 7140'MD 12:30 - 13:00 0.50 DRILL P INTI POOH F/7140'MDT/6970'MD -POOH WITHOUT PUMPS OR ROTARY -OBSERVE 30K OVERPULL WITH NM STABILIZER AT WINDOW -ATTEMPT TO ROTATE SLOWLY THROUGH WINDOW,NO SUCCESS -RIH 15'BELOW OVERPULL,PU AND FIRE JARS PRIOR,SUCCESSFULLY GET THRU WINDOW -UPWT165K,DNWT111K@6970'MD 13:00 - 15:00 2.00 DRILL P INTI CBU 2X -600 GPM,3155 PSI -120 RPM -RECIPROCATE PIPE 90'STROKES -PUMP LOW/HIGH VIS SWEEP W/5% INCREASE IN CUTTINGS -FLOW CHECK WELL F/10MINS,STATIC 15:00 - 15:30 0.50 DRILL P INTI RIG SERVICE -INSPECT SAVER SUB PRIOR T/GOING BACK INTO OPEN HOLE(GOOD) -LUBRICATE RIG -MONITOR WELLBORE VIA HOLE FILL, STATIC -FINCTION TEST BOPE,ANNULAR,LOWER RAMS,CHOKE AND KILL HCR VALVES. Printed 3/28/2016 1 04 57PM *All depths reported in Drillers Depths* North America-ALASKA-BP " � • Operation Summary Report Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/me:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs I Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:30 - 17:30 2.00 DRILL P INTI RIH W/8.5"DRILLING BHA#4B FROM 7140'MD T/9240'MD -RIH ON ELEVATORS WITH 4"DP FROM DERRICK @ 90'/MIN -OBSERVE TAKING WEIGHT AT 3K-5K AS BHA PASSED THROUGH WINDOW -STACKED OUT 7K WHEN NM STABILIZER -REACHED BOTTOM OF WINDOW,THEN SLID THROUGH PU BHA T/PULL NM STABILIZER BACK THROUGH WINDOWAND SEE NO OVERPULL -CONTINUE T/RIH 17:30 - 18:30 1.00 DRILL P INTI CBU 1XASOVE HRZ - 550GPM,3380PSI @ 180 RPM --RECIPROCATE 90'STROKES -FLOW CHECK WELL F/-10MINS,STATIC 18:30 - 21:00 2.50 DRILL P INTI RIH W/8_5"DRILLING BHA#48 F/9240'MD T/ 10255'MD -RIH W/4"DP STANDS OUT OF DERRICK @ 90FT/MIN UNTIL HRZ -SLOW TO 60FT/MIN BELOW HRZ 21:00 - 00:00 3.00 DRILL N DPRB INTI WORK PIPE THROUGH TIGHT HOLE -OBSERVE STRING STACKING WEIGHT UP TO 15K@ 10250'MD -ATTEMPT TO POOH,OBSERVE UP TO 30K OVERPULL -STAGE PUMPS UP,WHILE MOVING PIPE -OBSERVE SEVERAL PACKOFFS,STAGE PUMPS T/GAIN CIRCULATION -PUW 205K,SOW 123K 1/27/2016 00:00 - 02:00 2.00 DRILL N DPRB INTI CIRCULATE AND CONDITION -CONTINUE SLOWLY STAGING PUMPS UP TO DRILLING RATE -WORK PIPE WHILE STAGING PUMPS UP -PUMPS AT DRILLING RATE,WORK PIPE IN SHORT INTERVALS TO MINIMIZE PACK OFF POTENTIAL -PACKED OFF AT 10,240'MD SHUT PUMPS DOWN -BLED PRESSURE OFF -UP WT 212K,DN WT 127K 02:00 - 06:00 4.00 DRILL N DPRB INTI CIRCULATE AND CONDITION -STAGE PUMPS UP -OBSERVE PACK OFFS,STAGE PUMPS T/ GAIN CIRCULATION AND SLOWLY INCREASE TO DRILLING RATE - START PIPE ROTATION AT 20 RPM WITH 450 GPM 3200 PSI -STAGE UP RPM AND GPM T/550 GPM,3650 PSI,120 RPM. 06:00 - 07:30 1.50 DRILL N DPRB INTI CIRCULATE BOTTOMS-UP 1 TIME -550 GPM,3650 PSI -120 RPM,12K TORQUE,154 ROT WT -WORK PIPE 60'WHILE CBU 07:30 - 12:00 4.50 DRILL N DPRB INTI BACK REAM OUT OF THE HOLE F/10,240'MD T/9,524'MD -550 GPM,3680 PSI AT 10,280'MD -120 RPM,12K TORQUE,154K ROT WT -PU 192K,SO 125K,ROT 145 • Printed 3/28/2016 1.04.57PM "ATI depths reported in Drillers Depths` North America:ALASKA 6 f age of` 2' Operation Summary Report Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UW:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 13:00 1.00 DRILL N DPRB INTI BACK REAM OUT OF THE HOLE F/9,524'MD T/9,350'MD -550 GPM,3475 PSI AT 9,496'MD -120 RPM,12K TORQUE,154K ROT -PU 185K,SO 126KAT 9,432'MD 13:00 - 14:30 1.50 DRILL N DPRB INTI CIRCULATE AND CONDITION MUD -CIRCULATE BOTTOMS UP 2 TIMES -550 GPM,3420 PSI -150 RPM,10K TORQUE -PUMP WEIGHTED SWEEP 2 LBS OVER,24 BBL SWEEP CUTTING INCREASE 5% -MONITOR WELL FOR 10 MINUTES:(STATIC) 14:30 - 15:00 0.50 DRILL N DPRB INTI RIH WITH 4"DRILLING BHA 4B FROM 9,350' MD TO 9,910'MD -RIH ON ELEVATORS WITH 4"OP FROM DERRICK RIH AT90FPM -STOP AT TOP OF TKNG TO RAISE MUD WEIGHT TO 10.7 PPG 15:00 - 19:00 4.00 DRILL N DPRB INTI CIRCULATE AND CONDITION MUD -550 GPM,3520 PSI -RPM 120,ROT 148K WT UP MUD F/10.4 PPG TO 10.7 PPG 550 GPM,3695 PSI NEW PUMP PRESSURE -OBTAIN SPR'S WITH NEW MUD WT. -FLOW CHECK WELL(WELL STATIC) 19:00 - 00:00 5.00 DRILL N DPRB INTI REAM IN THE HOLE F/9,910 T/10,572'MD -548 GPM,AT 3940 PSI -120 RPM,TORQUE 8-12K,100 TO 300 FPM AS WELL ALLOWED -PU 195K,SO 140K,ROT 159KAT 10,477'MD 1/28/2016 00:00 - 10:30 10.50 DRILL P_ INTI REAM IN THE HOLE F/10,572 T/11,458'MD -550 GPM,AT 3900 PSI -120 RPM,TORQUE 8-12K,100 TO 300 FPH AS WELL ALLOWED -PU 242K,SO 128K,ROT 170KAT 11,458'MD -OBSERVE SHALE SPLINTERS ACROSS THE SHAKER 10:30 - 12:00 1.50 DRILL P INTI CIRCULATE 2X BU -550 GPM,4050 PSI -80 RPM,11KTQ WHILE RECIPROCATING PIPE IN 75'STROKES -PUMP 25 BBL 12.7 PPG WEIGHTED SWEEP -MW 10.7 PPG IN AND OUT 12:00 - 14:30 2.50 DRILL P INTI CONTINUE T/CIRCULATE 2X BU -550 GPM,4050 PSI -80 RPM 11KTQ WHILE RECIPROCATING PIPE IN 75'STROKES -12.7 PPG WEIGHTED SWEEP INCREASED CUTTINGS 10% 14:30 - 18:30 4.00 DRILL N DPRB INTI PUMP OUT OF HOLE F/11458'MDT/THE TOP OF THE HRZ©9250'MD -MONITOR WELL F/10 MINS(STATIC), -MW IN AND OUT 10.7 PPG -82 GPM 290-320 PSI -PULLING PIPE @ 50 FT/MIN 18:30 - 19:30 1.00 DRILL N DPRB INTI CIRCULATE BU 1X @ 9250'MD WHILE ROTATING AND RECIPROCATING -550 GPM,3575 PSI -120 RPM,ROT WT 142K Printed 3/28/2016 1 04 57PM *AII depths reported in Drillers Depths* North America-ALASKA `"19 of 52 Operation Summary Report A f Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253 00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time 1/8/1982 12:00:00AM Rig Release.2/28/2016 Rig Contractor.PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:30 - 22:30 3.00 DRILL N DPRB INTI POH ON ELEVATORS F/9250'MD T/6794'MD -FLOW CHECK WELL F/1OMINS(STATIC) -5-10K INCREASE IN DRAG AS BHA ENTERS THE WINDOW -OVERPULL 25K @ 7130'MD(FLEX COLLAR TOOL JOINT),ATTEMPT T/PULL THROUGH TWICE WITH NO SUCCESS,THIRD ATTEMPT SUCCESSFUL PU 150K,SO 112K @ 6794'MD 22:30 - 00:00 1.50 DRILL P INTI PU HES RTTS TOOLAS PER HES REP -INSTALL PORTED FILL SUB UNDER RTTS -CHECK TORQUE ON ALL CONNECTIONS -RIH WITH RTTS AND SET 1/29/2016 00:00 - 01:00 1.00 DRILL P INTI PULL WEAR RING -RIG UP TEST JOINT PULL WEAR RING -INSTALL TEST PLUG 01:00 - 04:00 3.00 DRILL P INTI INSPECT DERRICK,RIG UP TO TEST BOPE -INSPECT DERRICK -INSPECT BLOCKS AND TOP DRIVE INSPECT FORUM CRANE -FILL STACKAND CHOKE MANIFOLD AIR OUT SYSTEM 04:00 - 09:00 5.00 DRILL P INTI TEST BOPE TO 250 PSI LOW,3500 PSI HIGH, -FOR 5 MINUTES EACH -TEST WITH 7",2 7/8"AND 4.5"TEST JOINTS. -ALL TESTS CHARTED -ANNULAR -UPPER PIPE RAMS 7" -BLIND SHEAR RAM -MUD CROSS -LOWER PIPE RAMS 2 7/8"X 5 1/2" -WITNESS WAIVED BY AOGCC BRIAN BIXBY 09:00 - 10:00 1.00 DRILL P INTI BACK OUT LOCK DOWNS -BACK OUT LOCK DOWNS AS PER CAMERON REP AND PROCEDURE -PULL TEST PLUG -SET WEAR RING -RUN IN LOCK DOWNS TO HOLD WEAR RING AS PER CAM REP. 10:00 - 11:00 1.00 DRILL P INTI RETRIEVE HANG OFF TOOL FROM WELL BORE -PICK UP RETRIEVING TOOL -RIH STING INTO HANG OFF TOOL -RELEASE HANG OFF TOOL,MONITOR WELL, LET ELEMENTS RELAX -POH LAY DOWN HANG OFF TOOL 11:00 - 12:30 1.50 DRILL P INTI CIRCULATE STEEL LUBE PILL - RIH 2 STANDS T/6,975' -CIRCULATE STEEL LUBE PILL SURFACE TO SURFACE -450 GPM,3100 PSI 12:30 - 14:00 1.50 DRILL P INTI CUT AND SLIP DRILL LINE -CUT AND SLIP 5 WRAPS -RESET CROWN 0 MATIC RE-CALIBRATE TOTCO AND SLB SYSTEMS Printed 3/28/2016 1 04 57PM `AII depths reported in Drillers Depths* North America ALASKA-BPS. Page 20 of 52 Operation Summary Report Common Well Name:R-16 1 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To 1 Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 17:00 3.00 DRILL N DPRB INTI RIH WITH 8.5"DRILLING BHA#4B F/6,975' T/11,308' -RIH ON ELEVATORS WITH 4"STANDS OF DP -BREAK CIRCULATION EVERY 20 STANDS -550 GPM,3470 PSI FOR 8 MINUTES AS PER SLB PROCEDURE -UPWT146K,SOWT117K,AT6,975' 17:00 - 22:00 5.00 DRILL N DPRB INTI -CONDITION MUD AND CIRCULATE WASH TO BOTTOM F/11,308'T/11,458' 340-500 GPM,2015-3617 PSI, - 60-80 RPM,9-11KTQ CBU 3 X -500 GPM,3580 PSI -80 RPM,9-12K TQ PUMP WEIGHTED SWEEP(2 PPG OVER AT 12.7 PPG)7%INCREASE -MONITOR WELL FOR 10 MINUTES(STATIC) MUD WT 10.7 PPG IN,10.7 PPG OUT -SPOT 10 BBL SURGE PILL WITH 35 PPB LCM -PUMP OUT OF HOLE AT 1 BPM,PULL SPEED 40 FPM TO SPOT PILL ON BOTTOM -42 GPM,155 PSI. OBTAIN SPR'S ON BOTTOM 22:00 - 23:30 1.50 DRILL P INTI PUMP OUT OF HOLE F/11,451'T/10,194' -84 GPM,260 PSI AT 11,305' -PULL SPEED 70-90 FPM -MONITOR WELL VIAACTIVE PIT#1 (CORRECT DISPLACEMENT) -UP WT 199K,SO WT 135KAT 11,308' 23:30 - 00:00 0.50 DRILL P INTI SERVICE RIG 1/30/2016 00:00 - 01:30 1.50 DRILL P INTI PUMP OUT OF HOLE F/10,194'T/9,250' -84 GPM,260 PSI AT 11,305' -PULLING SPEED 70-90 FPM -MONITOR WELL VIAACTIVE PIT#1 CORRECT DISPLACEMENT) -UP WT 199K,SO WT 135KAT 10,308' 01:30 - 04:00 2.50 DRILL P INTI POH F/9,250'T/6,950' -POH ON ELEVATORS STANDING BACK 4"DP IN DERRICK -ENCOUNTERED TIGHT SPOT AT 8,910', 25K OVER WORKED TIGHT SPOT 3 TIMES NO ISSUES -MONITOR WELL FOR 10 MINUTES AT THE WINDOW(STATIC) -PU WT 170K,SO WT 135KAT 9,100' 04:00 - 05:00 1.00 DRILL P INTI CBU AT WINDOW -550 GPM,3035 PSI -DROP DP RABBIT -MONITOR WELL(STATIC) 05:00 - 07 30 2.50 DRILL P INTI POOH ON ELEVATORS F/6,950'MD TO 738' MD -MONITOR WELL FOR 10 MINUTES(STATIC) -MW 10.7PPG IN AND OUT -PU 170K,SO 128K,©6,950'MD -MONITOR WELL VIA TRIP TANK (DISPLACEMENT GOOD) -CREW PERFORM TABLE TOP KICK WHILE TRIPPING DRILL 07:30 - 11:00 3.50 DRILL P INTI LID 8.5"DRILLING BHA#4B AS PER SLB DD -MONITOR WELL F/10 MINS(STATIC) Printed 3/28/2016 1:04:57PM *AII depths reported in Drillers Depths* North America-ALASKA-BP laage 21 of 52 Operation Summary Report ,�' Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 12:00 1.00 DRILL P INTI CLEAN AND CLEAR RIG FLOOR -R/U DOYON CSG SERVICES F/7"LINER RUN 12:00 - 12:30 0.50 CASING P INTI CONTINUE T/R/U DOYON CSG -INSPECT ALL VENDOR EQUIPMENT PRIOR T/USE 12:30 - 21:30 9.00 CASING P INTI RIH W/7"LINER F/SURFACE T/4621'MD -VERIFY FLOATS(GOOD) UNABLE TO GET FLUID TO FALL THROUGH FLOATS -RIG AND PUMP THROUGH FLOATS, PRESSURE UP TO 190 PSI FLOATS OPENED -CIRCULATE THROUGH FLOAT EQUIPMENT FOR 10 MINUTES RIG DOWN HEADPIN -OBSERVED FLOATS OPERATING PROPERLY -TO TURN ALL CONNECTIONS T/11,950 FT-LBS -FILL CSG ON THE FLY,TOPPING OFF EVERY 10 JTS -OBTAIN PU,SO WEIGHTS EVERY 10 JOINTS -PU 137K,SO 114K @ 4621' 21:30 - 23:30 2.00 CASING P INTI MU BAKER 4 PLUG LINER HANGER SYSTEM AS PER BAKER REP 1-R/D DOYON CSG EQUIPMENT -UD TOP SINGLE OF STAND#1 -CIRCULATE LINER VOLUME @ 5 BPM, STAGE UP PUMPS IN 0.5BBL INCREMENTS -5 BPM,304 PSI @ 4,715'MD -PU 137K,SO 114K,@ 4,715'MD 23:30 - 00:00 0.50 CASING P INTI LUBRICATE RIG FLOOR EQUIPMENT 1/31/2016 00:00 - 03:00 3.00 CASING P INTI RIH W/7"LINER ON 4"DP F/4,796' T/6,950' -RIH ON ELEVATORS SW/STANDS OF 4"DP F/DERRICK -WASH DOWN EVERY 5 STANDS 03:00 - 04:00 1.00 CASING P INTI CIRCULATE BOTTOMS UP -CIRCULATE BOTTOM UP 1 X AT THE WINDOW -STAGE UP PUMP F/1 BPM TO 5 BPM -214 GPM,458 PSI -MUD WTIN10.7,MUD WTOUT 10.7 04:00 - 10:00 6.00 CASING P INTI RIH W/7"LINER ON 4"DP F/6,950'T/11447' -RIH ON ELEVATORS W/STANDS OF 4"DP F/ DERRICK -WASH DOWN EVERY 5 STAND FOR 10 MINUTES AT 5 BPM -MONITOR WELL VIAACTIVE#1(GOOD DISPLACEMENT) -MAKE UP CEMENT HEAD AS PER BAKER REP -PU 240K,SO 140KAT 10770' 10:00 - 14:00 4.00 CASING P INTI ATTEMPT TO WASH TO BOTTOM -STRING TAKING WEIGHTAT 11440' -STAGE PUMP RATE UP IN 0.5 BBL INCREMENTS TO 2.5 BPM -RETURNS VARIED BETWEEN 95%AND 100% -ATTEMPT TO WASH TO BOTTOM -PULL UP WHEN PRESSURE INCREASE OBSERVED TO MANAGE ECD'S WHILE LIFTING SETTLED SOLIDS -CONTINUE TO WORK PIPE AND STAGE PUMPS UNTIL REACHING BOTTOM AT 11458' Printed 3/28/2016 1 04 57PM *AII depths reported in Drillers Depths* North America-ALASKA-BP}, • O 52 Azi Operation Summary Report Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 18:30 4.50 CASING P INTI WASH DOWN F/11447'T/11458' -STAGE UP TO RATE IN.5 BPM INCREMENTS TO FINAL CIRCULATING RATE OF 5 BPM -CONDITION MUD,CBU 3X,MW 10.7 IN AND OUT ON THIRD BOTTOMS UP - 3 BPM,485 PSI,100%RETURNS - 3.5 BPM,505 PSI,100%RETURNS 4 BPM,580 PSI,100%RETURNS • _.4.5 BPM,650 PSI,100%RETURNS 5 BPM,705 PSI,100%RETURNS - PU 250K,SO 130K,AT 11449' 18:30 - 20:30 2.00 CASING P INTI DROP 1.5"DOBS FUNCTIONING BALL -PUMP BALL DOWN AT 2 BPM AT 255 PSI -OBSERVED BALL GO ON SEAT AT 575 STROKES -ATTEMPT TO PRESSURE UP TO 2900 PSI MULTIPLE TIMES NO SUCCESS -OBSERVED FLUID WASHING BY,BALL NOT SEATING -CONSULT WITH DRILLING SUPT,ODE, AND WTL FOR PLAN FORWARD PUMP AT 5 BPM TO REACH 3000 PSI OBSERVED LINER HANGER SET SET 100K ON LINER TO CONFIRM LINER HANGER SETTING,LINER SET ON DEPTH 20:30 - 23:00 2.50 _ CASING N DFAL 11,456.00 INTI DECISION MADE TO DROP TOP DART TO VERIFY SHEARING OF DOBS BALL SEAT -RELEASE BOTTOM DART -PUMP DART DOWN AT 5 BPM AT 710 PSI -SLOW TO 3 BPM AT 355 PSI TO LATCH DART -OBSERVED LATCH AT 763 STROKES -PRESSURE INCREASED TO 2540 PSI WITH NO SHEAR INDICATION -OBSERVED SLIGHT DROP IN RETURNS, THEN FULL RETURNS AGAIN -SHUT DOWN MUD PUMPS AND BLEED PRESSURE TO 0 PSI 23:00 - 23:30 0.50 CASING N DFAL 11,456.00 INTI CONSULT WITH DRILLING SUPERINTENDENT ODE AND WTL FOR PLAN FORWARD 23:30 - 00:00 0.50 CASING P INTI SERVICE RIG EQUIPMENT 2/1/2016 00:00 - 01:00 1.00 CASING N DFAL 11,456.00 INTI EMERGENCY RELEASE LINER RUNNING TOOL AS PER BAKER REP -PU 180K,TORQUE DRILL PIPE TO THE LEFT 2K, 3 TURNS -WORK TORQUE DOWN -PU 100K,TORQUE DRILL PIPE TO THE LEFT 4K,2 TURNS -TOOL RELEASED -TORQUE PIPE TO THE RIGHT,15K -RELEASE TORQUE SLOWLY -PU ON STRING,DRILL STRING RELEASED FROM HANGER Printed 3/28/2016 1 04 57PM `AII depths reported in Drillers Depths* • North America ALASKA-BP � • '�� ` Page 23 of 52 Operation Summary Report Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay I Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:00 - 06:30 5.50 CASING N DFAL 11,456.00 INTI POOH ON ELEVATORS F/6809'T/SURFACE -POOH SLOWLY TO KEEP PLUG FROM SWABBING -LAY DOWN CEMENT HEAD -MONITOR WELL FOR 10 MINUTES(STATIC) -POOH ON ELEVATORS STANDING 4"DP IN DERRICK LID LINER RUNNING TOOLAND 4 PLUG SYSTEM BOTH LINER WIPER PLUGS STILL ATTACHED TO TOOL STRING 06:30 - 09:00 2.50 CEMT P INTI WAIT ON BAKER TO MAKE UP TOOLS TO CEMENT 7"LINER -CHANGE OUT UPPER RAMS DRAIN STACK -MU WEAR RING PULLER AND ENGAGE WEAR RING BACK OUT LOCK DOWNS AS PER CAM REP -PULL WEAR RING -MU TEST PLUG AND SET -CHANGE OUT UPPER RAMS F/7"SOLID BODIES TO 2 7/8"X 5 1/2"VARIABLES -MU 2 7/8"TEST JOINT AND ENGAGE TEST PLUG 09:00 - 11:00 2.Q0 CEMT P INTI TEST UPPER RAMS 250 PSI LOW 3500 PSI HIGH -TEST WITH 2 7/8"AND 4 1/2"TEST JOINTS -ALL TEST CHARTED -PULL TEST PLUG -MU WEAR RING AND SET WEAR RING -BLOW DOWN CHOKE AND KILL LINES 11:00 - 12:00 1.00 CEMT P INTI SERVICE RIG EQUIPMENT 12:00 - 20:30 8.50 CEMT N- DFAL 11,456.00 INTI WAIT ON SEAL ASSEMBLY FROM BAKER CHANGE OUT SAVER SUB ON TD -PRESSURE TEST CEMENT LINE -INSTALL NEW DERRICK ASSIST -PULL PS-21'S,PULL CARRIERS,POWER WASH,INSPECT GREASE AND REINSTALL PS-21'S 20:30 - 00:00 3.50 CEMT N DFAL 11,456.00 INTI RIH WITH SEAL ASSEMBLY F/SURFACE T/ 2300' -PU/MU SEAL ASSEMBLY AS PER BAKER REP -RIH WITH SEAL ASSEMBLY ON 4"DP OUT OF THE DERRICK F/SURFACE T 2300' -CIRCULATE BU AT 2300', -168 GPM AT 107 PSI 2/2/2016 00:00 - 00:30 0.50 CEMT N DFAL 11,458.00 INTI RIH WITH BAKER SEALASSEMBLY(BSA)F/ 4000'T/5000' -RIH ON ELEVATORS WITH 4"DP STD'S FROM DERRICK -MONITOR WELL VIA TRIP TANK(CORRECT DISPLACEMENT) -PU 192K,SO 92K AT 5000' 00:30 - 01:30 1.00 CEMT N DFAL 11,458.00 INTI CIRCULATE BOTTOMS UP 1X -171 GPM,235 PSI Printed 3/28/2016 1 04 57PM •AII depths reported in Drillers Depths* • North America-ALASKA-BP % Page 24' 52 Operation Summary Report , Common Well Name R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code j NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 03:00 1.50 CEMT N DFAL 11,458.00 INTI RIH WITH BAKER SEAL ASSEMBLY F/5000'T/ 6791' -RIH ON ELEVATORS WITH 4"DP STD'S FROM DERRICK -MONITOR WELL VIA TRIP TANK(CORRECT DISPLACEMENT) -OBTAIN PARAMETERS. PU 117K,SO 106K 03:00 - 05:30 2.50 CEMT N DFAL 11,458.0Q INTI ,CIRCULATE BOTTOMS UP 1.5X -171 GPM,315 PSI MAKEUP CEMENT HEAD WITH SINGLE -RIH&TAG LINER TIE-BACK RECEPTACLE AT 6,809'W/10KDOWN -P/U ROTATE STRING 180 DEG AND ATTEMPT TO STING IN,UNSUCCESSFUL -P/U AND SET 2K ON LINER TOP,ROTATE AT 2 RPM AND ROLL BSA INTO LINER HANGER -SET BSA MULE SHOE ON NO-GO AT 6,820' MD W/ 15K DOWN WEIGHT 05:30 - 12:00 6.50 CEMT N DFAL 11,458.00 INTI STAGE UP TO CEMENTING RATE IN.025-BPM INCREMENTS TO FINAL CIRCULATING RATE OF 5.0-BPM CBU 1.5X . 0.5-BPM AT 116-PSI W/100%RETURN FLOW 1.0-BPM AT 197-PSI W/100%RETURN FLOW -1.5-BPM AT 220-PSI W/100%RETURN FLOW -2.0-BPM AT 256-PSI W/100%RETURN FLOW -2.5-BPM AT 310-PSI W/100%RETURN FLOW -3.0-BPM AT 392-PSI W/100%RETURN FLOW -3.5-BPM AT 450-PSI W/100%RETURN FLOW -4.0-BPM AT 540-PSI W/100%RETURN FLOW -4.5-BPM AT 603-PSI W/100%RETURN FLOW -5.0-BPM AT 680-PSI W/100%RETURN FLOW -CONDITION MUD TO 10.7-PPG IN/OUT AND 11-PV,18-YP 12:00 - 13:00 1.00 CEMT N DFAL 11,458.00 INTI CIRCULATE AND CONDITION MUD FOR CEMENT JOB -CBU 1.25X -FINAL CIRCULATING RATE 5.0-BPM AT 680-PSI -PJSM-FOR CEMENT JOB -CONDITION MUD TO 10.7-PPG IN/OUT AND 11-PV,18-YP -START BATCHING CEMENT Printed 3/28/2016 1.04 57PM *All depths reported in Drillers Depths* North America-ALASKA B � Page itsof 52 Operation Summary Report - Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 15:00 2.00 CEMT P INTI CEMENT 7.0"INTERMEDIATE CASING AS FOLLOWS: -PUMP 25 BBLS OF 11.0-PPG MUDPUSH II SPACER @ 5.0-BPM,ICP 400-PSI,FCP 576-PSI -RELEASE LOWER DP WIPER DART -PUMP 35.1-BBLS OF 15.3-PPG TAIL CEMENT 5.0-BPM,EXCESS VOLUME 40%(YIELD 1.32-CU.FT/SK) -RELEASE UPPER DP WIPER DART WITH 10-BBLS.FRESH WATER AND CLEAR LINES PERFORM DISPLACEMENT WITH SLB CEMENTERS WITH 10.7-PPG LSND MUD PER SLB CADE -LOWER DP WIPER DART LATCH UP TO LOWER LINER WIPER PLUG AT 37.0-BBLS DISPLACED AT 5.0-BPM AT 1300-PSI SHEAR UPPER DP WIPER DART LATCH UP TO UPPER LINER WIPER PLUG AT 71.0-BBLD. DISPLACED AT 5.0-BPM AT 1500-PSI SHEAR LOWER LINER WIPER PLUG LANDED AT LCP AT 215-BBLS,OBSERVE 900 PSI INCREASE LOSS OF 4.0-BBLS.BEFORE CEMENT TURNED CORNER -REDUCE RATE TO 2.0-BPM PRIOR TO PLUG BUMP:FINAL CIRCULATING PRESSURE 430-PSI -DISPLACED TOTAL OF 248-BBLS PER SLB MICROMOTION METER -DID NOT BUMP PLUG. CALLED ODE FOR DECISION TO CONTINUE PUMPING TO BUMP. DECISION TAKEN TO STOP AND CHECK FLOATS-FLOATS GOOD -100%RETURNS AFTER CEMENT ROUNDED CORNER -CEMENT WET AT 12:39-HRS. -CEMENT IN PLACE AT 14:29-HRS. 15:00 - 16:30 1.50 CEMT N DFAL 11,458.00 INTI PULL BULLET SEAL ASSEMBLY(BSA)OUT OF PBR TO 6,804 -CIRCULATE BOTTOMS UP 1X FROM 6,804' MD -340 GPM AT 1170 PSI -MW:10.7 PPG IN/OUT -MONITOR WELL 10 MIN-WELL STATIC -RIG DOWN CEMENT HOSE AND EQUIPMENT 16:30 - 20:00 3.50 CEMT N DFAL 11,458.00 INTI PULL OUT OF THE HOLE ON ELEVATORS WITH BSA -POOH FROM 6,804'STANDING BACK DP -MONITOR TRIP ON TRIP TANK,CORRECT HOLE FILL OBSERVED -INSPECT SEAL ASSEMBLY-NO DAMAGE OBSERVED,WSL&BOT REP VERIFIED 20:00 - 20:30 0.50 CASING P INTI RIG SERVICE -GREASE&INSPECT TOP DRIVE,WASH PIPE -CLEAN&CLEAR RIG FLOOR Printed 3/28/2016 1.04.57PM *AII depths reported in Drillers Depths* • 4" WOC ��� NorthAmenea-ALASKA ®' 'Page Pa e26of52 ' Operation Summary Report Common Well Name.R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-0171-IY-C:(8,196,253.00) Project Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 00:00 3.50 CASING N DFAL 11,458.00 INTI MAKE UP DOG SUBASSEMBLY FOR SETTING ZXP LINER TOP PACKER -MAKE UP ASSEMBLY AS DIRECTED BY BOT REP -RIH WITH DOG SUB ASSY ON 4"DP FROM THE DERRICK TO 4,700'MD -FILL PIPE EVERY 2000'MD,170 GPM,W/175 PSI 10.7 PPG LSND IN/OUT MONITOR TRIP ON TRIP TANK,CORRECT DISPLACEMENT OBSERVED. 2/3/2016 00:00 - 01:30 1.50 CASING N DFAL 11,458.00 INTI RIH WITH DOG SUB ASSY ON 4"DP FROM THE DERRICK FROM 4,700'MD,TO 6,781'MD -FILL PIPE EVERY 2000'MD,171 GPM,295 PSI 10.7 PPG LSND IN/OUT -MONITOR TRIP ON TRIP TANK,CORRECT DISPLACEMENT OBSERVED. OBTAIN SPR'S -P/U 119K,8/0 106KAT 6800'MD 01:30 - 02:00 0.50 CASING N DFAL 11,458.Oa INTI CIRCULATE DRILL PIPE VOLUME PRIOR TO STINGING INTO TOP OF LINER. 171 GPM,280 PSI -10.7 PPG LSND IN/OUT 02:00 - 02:30 0.50 _ CASING N DFAL 11,458.00 INTI STING INTO LINER TOP AND SET PACKER PER BAKER PROCEDURE -ROLL PUMP WHILE SLACKING OFF TO STING INTO PBR WITH DOG SUB - 20 GPM,50 PSI,OBSERVE INCREASE OF 50 PSI WHEN DOG SUB ENTERED PBR,SHUT DOWN PUMPS -CONTINUE SLACKING OFF TO SET 50K ON LINER TOP -OBSERVE POSITIVE INDICATION OF PACKER SETTING -PICK UP TO NEUTRAL WEIGHT 02:30 - 04:00 1.50 CASING N DFAL 11,458.00 INTI PRESSURE TEST LINER TOP PACKER -REMAIN STUNG INTO LINER TOP -REVIEW PRESSURE CROSSCHECK -250 PSI FOR 5 MIN AND 3500 PSI FOR 5 MIN -AFTER PRESSURE REACHED 3650 PSI, PRESSURE DROPPED OFF IMMEDIATELY TO 1550 PSI AND HELD,WHILE AT THE SAME TIME THE STRING WEIGHT INCREASED 20K -BLEED PRESSURE OFF,STRING WEIGHT DECREASED TO NEUTRAL WEIGHT -PUMPED 5.5 BBLS TO PRESSURE UP AND BLED BACK 4.6 BBLS -SHUT DOWN AND CALL ODE AND WWL TO DISCUSS PLAN FORWARD 04:00 - 05:30 1.50 CASING C DECOMP RE-PRESSURE TEST LINER TOP PACKER -REMAIN STUNG INTO LINER TOP -CHECK ALL SURFACE EQUIPMENT-GOOD -CHECK POSITION OF PBR-AT CORRECT DEPTH -CHECK CONFIRM PROPER SURFACE LINEUP TO PRESSURE TEST -ATTEMPT 250 PSI TEST,OBSERVE DIRECT PRESSURE INCREASE ON OA,SHUT PUMP DOWN -INFORM ODE,MAKE DECISION TO MONITOR WELLAND POOH WITH DOG SUB TO P/U RTTS Printed 3/28/2016 1 04 57PM *All depths reported in Drillers Depths* North America-ALASKA-BP, 1 Page i`f ree' f �� Operation Summary Report Common Well Name R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor.PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:30 09:30 4.00 CASING C DECOMP POOH ON ELEVATORS FROM 6,890'MD TO SURFACE -P/U 119K,S/O 106KAT 6800'MD -MUD WEIGHT:10.7 PPG LSND IN/OUT -MONITOR TRIP ON TRIP TANK,CORRECT HOLE FILL OBSERVED -BREAK DOWN BAKER PACKER SETTING TOOLS 09:30 - 10:30 1.00 CASING C DECOMP ;TEST 9-5/8"PACK OFF AS PER CAMERON 250 PSI FOR 5 MIN/3500 PSI FOR 15 MIN, GOOD TEST -MAKE UP 9-5/8"RTTS AS PER HALLIBURTON 10:30 - 12:00 1.50 CASING C DECOMP RIH WITH 9-5/8"RTTS FROM SURFACE TO 2,662'MD -10.7 PPG LSND IN/OUT -MONITOR TRIP ON TRIP TANK,CORRECT DISPLACEMENT OBSERVED. 12:00 - 14:30 2.50 CASING C DECOMP SET 9-5/8"RTTS AT 2,662'MD AS PER HES REP -P/U 68K,S/O 68K -RIG UP TO TEST BELOW RTTS PRESSURE TEST 9-5/8"X 7"LINER TOP PACKER —250 PSI FOR 5 MIN/3500 PSI FOR 30 MIN, GOOD TEST -PUMP 6.9 BBLS TO PRESSURE UP AND BLED BACK 6.8 BBLS AFTER TEST -LINE UP TO PRESSURE TEST ABOVE RTTS PRESSURE TEST ABOVE RTTS -PRESSURE UP TO 250 PSI AND OBSERVE PRESSURE INCREASE FROM 190 PSI TO 510 PSI ON OUTER ANNULUS -RIG DOWN TEST MANIFOLD -RELEASE RTTS AS PER HES REP 14:30 - 15:00 0.50 CASING C DECOMP POOH ON ELEVATORS FROM 2,662'MD TO 2,000'MD -MONITOR WELL FOR 10 MIN:STATIC -MUD WEIGHT:10.7 PPG LSND IN/OUT -MONITOR TRIP ON TRIP TANK,CORRECT HOLE FILL OBSERVED 15:00 - 16:00 1.00 CASING C DECOMP SET 9-5/8"RTTS AT 2,000'MD AS PER HES REP -P/U 63K,S/O 63K -LINE UP TO PRESSURE TEST ABOVE RTTS PRESSURE TEST ABOVE RTTS -PRESSURE UP TO 250 PSI AND OBSERVE PRESSURE INCREASE FROM 190 PSI TO 510 PSI ON OUTER ANNULUS -LINE UP TO TEST BELOW RTTS PRESSURE TEST BELOW RTTS -PRESSURE UP TO 250 PSI WITH NO PRESSURE INCREASE ON OA -RELEASE RTTS AS PER HES REP 16:00 - 16:30 0.50 CASING C DECOMP POOH ON ELEVATORS FROM 2,000'MD TO 1528'MD I-MONITOR WELL FOR 10 MIN:STATIC -MUD WEIGHT:10.7 PPG LSND IN/OUT -MONITOR TRIP ON TRIP TANK,CORRECT HOLE FILL OBSERVED Printed 3/28/2016 1 04 57PM *All depths reported in Drillers Depths* North America ALASKA RP, � f age 28 of 52 "%" Operation Summary Report Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:30 - 17:30 1.00 CASING C DECOMP SET 9-5/8"RTTS AT 1,528'MD AS PER HES REP -P/U 55K,S/O 55K -LINE UP TO PRESSURE TEST ABOVE RTTS PRESSURE TEST ABOVE RTTS -PRESSURE UP TO 250 PSI AND OBSERVE PRESSURE INCREASE FROM 190 PSI TO 510 PSI ON OUTER ANNULUS -LINE UP TO TEST BELOW RTTS PRESSURE TEST BELOW RTTS -PRESSURE UP TO 250 PSI WTH NO PRESSURE INCREASE ON OA -RELEASE RTTS AS PER HES REP 17:30 - 18:30 1.00 CASING C DECOMP POOH ON ELEVATORS FROM 1,528'MD TO -SURFACE -MONITOR WELL FOR 10 MIN:STATIC -MUD WEIGHT:10.7 PPG LSND IN/OUT -MONITOR TRIP ON TRIP TANK,CORRECT HOLE FILL OBSERVED -LAY DOWN RTTS AS PER HES REP 18:30 - 19:00 0.50 CASING C DECOMP RIG SERVICE: -GREASE BLOCKS,CROWN,ST-80,CHECK OIL ON TOP DRIVE 19:00 - 00:00 5.00 CASING. X WAIT 11,458.00 DECOMP WAIT ON E-LINE UNIT FOR USIT ON 9-5/8" CASING -PREP THE CELLAR BOX TO BE LINED WITH URETHANE PER CCI -CLEAN AND SERVICE RIG,CLEAN LUVERS ON DRAWWORKS AND TOP DRIVE GREASE AND LUBRICATE PIPE SHED EQUIPMENT 2/4/2016 00:00 - 10:00 10.00 CASING X WAIT 11,458.00 DECOMP WAIT ON E-LINE UNIT FOR USIT ON 9-5/8" CASING -COMPLETE WORK ORDERS ON GENERAL EQUIPMENT AROUND RIG -INSPECT 9-5/8"RAMS 10:00 - 12:00 2.00 CASING C DECOMP RIG UP SLB WIRELINE UNIT AND EQUIPMENT -PJSM FOR PICKING UP SLB EQUIPMENT: HIGH LIGHT LIFTING EQUIPMENT INSPECTIONS -PU WIRELINE EQUIPMENT TO THE RIG FLOOR,LOAD TOOLS IN THE PIPE SHED. 12:00 - 19:00 7.00 CASING C DECOMP 9-5/8" USIT LOG RUN TO DETERMINE TOP OF CEMENT IN THE 13-3/8"X 9-5/8" -MAKE UP USIT W/CCL/GR PER SLB. -RIH WITH USIT ASSEMBLY ON E LINE FROM SURFACE TO 3,200'MD. -MONITOR DISPLACEMENT ON THE TRIP TANK.-CORRECT DISPLACEMENT OBSERVED. -MAKE CORRELATION PASS. -LOG FROM 3200'MD TO SURFACE AS DIRECTED IN WELL PLAN OPERATIONAL CHANGE NOTICE -LAY DOWN LOGGING ASSEMBLY. -CLEAN AND CLEAR FLOOR. Printed 3/28/2016 1 04 57PM •AII depths reported in Drillers Depths* North America:Auk ;,z r zworaz • Operation Summary ReportI , Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor.PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 23:00 4.00 CASING C DECOMP MAKE UP 7"EZ DRILL SVB SQUEEZE PACKER -PJSM WITH SLB FOR MAKING UP TOOLAND TESTING FIRING TOOL -SLB REPS MAKING UP EZ DRILL AND FIRING TOOL ON SURFACE -RIH WITH EZ DRILL ON E-LINE,MONITOR DISPLACEMENT ON TRIP TANK-CORRECT DISPLACEMENT OBSERVED -MAKE CORRELATION PASS TO VERIFY SET DEPTH FOR EZSV -SET 7"EZSV AT 6,895'IN SECOND FULL JOINT BELOW THE TOP OF LINER -POOH WITH EZSV SETTING TOOL AND LAY DOWN AS DIRECTED.BY SLB ---RIG DOWN WRELINE EQUIPMENT AND TOOLS 23:00 - 23:30 0.50 CASING C DECOMP RIG SERVICE -GREASE BLOCKS,CROWN&ST-80 23 30 - 00 00 0.50 BOPSUR C DECOMP CHANGE UPPER'RAMS FROM 2-7/8"BY 5-1/2" VARIABLES TO 9-5/8"FIXED BORE -PJSMF FOR CHANGING RAMS. - DRAIN STACK,PULL WEAR RING,SET TEST PLUG. 2/5/2016 00:00 - 01:30 1.50 BOPSUB C DECOMP CHANGE UPPER RAMS FROM 2-7/8"BY 5-1/2" VARIABLES TO 9-5/8"FIXED BORE -PULL WEAR RING AND SET TEST PLUG -CLOSE BLIND SHEAR RAMS. -OPEN RAM DOORS AND INSTALL 9-5/8" RAMS -RUN IN TEST JOINTAND FILL STACK 01:30 - 04:30 3.00 BOPSUR C DECOMP PRESSURE TEST 9-5/8"RAMS -REVIEW PRESSURE CROSSCHECK LIST -PRESSURE TEST BOPE -TEST 9-5/8"RAMS TO 250/3500 PSI FOR 5/5 CHARTED MIN. -LEAK DISCOVERED IN THE DOOR SEAL OF THE BLIND SHEAR RAMS. -CHANGE THE DOOR SEAL. -RE-TEST 9-5/8"RAMS:TO 250/3500 PSI FOR 5/5 CHARTED MIN.-GOOD TEST -FUNCTION TEST ALL OTHER BOPE. 04:30 - 05:00 0.50 BOPSUR C DECOMP RIG DOWN TEST EQUIPMENT -PULL TEST JOINT AND TEST PLUG -INSTALL WEAR RING:9.1875"ID 05:00 - 08:00 3.00 FISH C DECOMP MAKE UP 9-5/8"CUTTER BHA PER BAKER REP AND RUN IN HOLE TO 2,164'MD -RIH ON 4"DP STANDS FROM DERRICK -MONITOR WELL ON TRIP TANK:PROPER DISPLACEMENT -LOCATE 9-5/8"CASING COLLARS AT 2164' MD,2126'MD,2089'MD 08:00 - 09:30 1.50 FISH C DECOMP DISPLACE WELL FROM 10.7 PPG LSND TO 8.5 PPG SEAWATER -256 PSI,615 PSI Printed 3/28/2016 1.04:57PM `AII depths reported in Drillers Depths* North America-ALASKA-BP". "age 30 of 52 Operation Summary Report Common Well Name.R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor.PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:30 - 12:00 2.50 FISH C DECOMP SPACE OUT AND CUT 9-5/8"CASING AT 2103' MD -256 GPM, 630 PSI -2K-5K TORQUE,80 RPM(1K FREE) -OBSERVE TOP DRIVE STALL AT 6K,BACK OUT TORQUE -PULL UP ON BHA TO 190K OVER IN 10K-25K INCREMENTS -PUMP 22 BBLS STEEL LUBE PILL AND SPOTTED OUTSIDE CUTTER BHA -STOP OPERATIONS AND CALL ODE AND WELLS SUPERINTENDENT FOR PLAN FORWARD. 12:00 - 16:30 4.50 FISH X WAIT 11,458.00 DECOMP WAIT ON PLAN FORWARD CCI SPRAY URETHANE IN CELLAR BOX -TAKE ON FLUID TO PITS -FORMULATE PLAN TO PULL UP TO 200K OVER UP WEIGHT 16:30 - 17:00 0.50 FISH X STUC 11,456.00 DECOMP WORK PIPE UP TO 265K -WORK BETWEEN 65K AND 265K MULTIPLE TIMES WITH NO SUCCESS CALL ODE AND WELLS SUPERINTENDENT FOR PLAN FORWARD 17:00 - 19:30 2.50 FISH-- X. WAIT 11,456.00 DECOMP WAIT ON PLAN FORWARD -DECISION MADE TO CUT DRILL PIPE ABOVE CUTTER BHA WITH WIRELINE **CAMERON FUNCTION TEST ALL LOCK DOWN SCREWS ON WELLHEAD FOR 9-5/8" CASING.CASING DOES NOT WANT TO GROW. 19:30 - 21:00 1.50 FISH X STUC 11,456.00 DECOMP RIG UP EXTRA BAILS ON TOP DRIVE TO PREP FOR E-LINE PACKOFF AND RIG UP -PULL BOTTLE NECK ELEVATORS FROM BAILS -RIG UP 8'AND 6'BAIL EXTENSIONS -INSTALL DRILL PIPE ELEVATORS ON BAIL EXTENSIONS 21:00 - 23:30 2.50 FISH X WAIT 11,458.00 DECOMP WAIT ON WIRELINE UNIT -LOAD AND TALLY(9)6"DRILL COLLARS,(21) JOINTS 5"HWDP,AND(60)JOINTS 5"DP -MU 5"TEST JOINT AND TIWVALVE 23:30 - 00:00 0.50 FISH C DECOMP RIG SERVICE -PERFORM DERRICK INSPECTION,GREASE AND INSPECT PS-21 2/6/2016 00:00 - 03:00 3.00 CASING X WAIT 11,458.00 DECOMP WAIT ON WIRELINE UNIT -MAKE UP STANDS OF 5"DP 03:00 - 13:30 10.50 FISH X STUC DECOMP RIG UP SLB WIRELINE UNIT AND EQUIPMENT -PU WIRELINE EQUIPMENT TO THE RIG FLOOR,LOAD TOOLS IN THE PIPE SHED. -CONNECT HES RADIAL CUTTING TORCH TOOL TO SLB ELINE -RIH&SET ON DEPTH AT 2,044'ELM -SET CHARGE TO CUT 4"DP,OBSERVED INDICATION OF POSITIVE CUT -POOH WITH ELINE AND RIG DOWN EQWUIPMENT 13:30 - 14:00 0.50 FISH X STUC DECOMP RIG DOWN EQUIPMENT FROM ELINE JOB -REMOVE BAIL EXTENSIONS AND RE-INSTALL ELEVATORS Printed 3/28/2016 1 04 57PM *AII depths reported in Drillers Depths* • North America-ALASKA BP = � Operation Summary Report �r- % Common Well Name R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs , Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 15:30 1.50 FISH X STUC DECOMP POOH WITH 4"DP CUT FROM 2,044'TO SURFACE -POOH LAYING DOWN DP TO THE PIPE SHED. -MONITOR WELL ON TRIP TANK-CORRECT HOLE FILL OBSERVED. -LD 65 JOINTS OF DP AND 21.78'CUT JOINT. 15:30 - 16:30 1.00 FISH X STUC DECOMP CHANGE OUT SAVER SUB. -CHANGE SAVER SUB FROM XT39 TO 4-1/2" IF 16:30 - 17:00 0.50 FISH C DECOMP RIG SERVICE -GREASE BLOCKAND TOP DRIVE 17:00 - 19:00 2.00 BOPSUR X STUC DECOMP PRESSURE TEST LOWER RAMS WITH 5" TEST JOINT. -DRAIN THE STACK,PU 5"TEST JOINT -CAMERON BOLDS,PULL WEAR RING -FILL STACK AND AIR OUT LINES. -PT LOWER 2-7/8"BY 5-1/2"VBR TO 250 PSI LOW 3500 PSI HIGH.PASSING TEST -ALL TESTS CHARTED-SEE ATTACHED BOP TEST CHARTS 19:00 - 20:00 1.00 BOPSUR X STUC DECOMP RIG DOWN ALL TEST EQUIPMENT BLOW DOWN LINES CIW BOLDS,PULL TEST PLUG&SET WEAR BUSHING WITH ID=9-3/16" 20:00 - 23:00 3.00 FISH X STUC DECOMP MAKE UP BAKER FISHING BHAAND SINGLE IN THE HOLE ON 5"DP -BHA:OVERSHOT W/GUIDE&EXTENSION, BUMPER SUB,OIL JAR&DC'S -OAL OF BHA:329.28' -SINGLE IN THE HOLE ON 5"DP FROM 329' TO 2,045'MD TAG TOP OF 4"DP -MONITOR TRIP ON TRIP TANK-CORRECT DISPLACEMENT OBSERVED 23:00 - 23:30 0.50 FISH C DECOMP CIRCULATE OUT STEEL LUBE FROM HOLE. 10 BPM,345 PSI -8.5 PPG SEAWATER IN/OUT 23:30 - 00:00 0.50 FISH X STUC DECOMP ENGAGE 4"DP WITH GRAPPLE FROM 2,045' TO 2,050'MD -ENGAGE FISH WITH PUMP ON AT 3 BPM, OBSERVE 40 PSI INCREASE,PU 10K OVER PUW TO VERIFY ENGAGEMENT. -PUW-92K ,SOW-96K -JAR ON FISH AT 2,050' -HIT JAR 3-4 TIMES AT 160K,3 TIMES AT 170K WITH NO SUCCESS. 2/7/2016 00:00 - 01:00 1.00 FISH X STUC DECOMP CONTINUE JARRING OPERATION -FIRE JARS IN 10K INCREMENTS FROM 180K PUW TO 215K (123K OVER PUW). -FISH CAME FREE AT 215K. -PICK UP&LAY DOWN ONE JOINT. -RU FOR FREEZE PROTECT CIRCULATION. Printed 3/28/2016 1.04.57PM "All depths reported in Drillers Depths* North America-ALASKA-BP ;:Page 32 of 52 Operation Summary Reportr Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date.1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/me:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor.PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual©65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:00 - 07:00 6.00 FISH C DECOMP ARCTIC PAC FREEZE PROTECT CIRCULATION -INSPECT LINE UP FOR CIRCULATION. ENSURE PROPER LINE UP FOR PUMPING OUT TO TIGER TANK. -RIG UP HEAD PIN AND CEMENT LINE ON SURFACE TO PUMP THROUGH. -PUMP 34 DIESEL DOWN THE DP TAKING RETURNS TO THE PITS.CLOSE THE ANNULAR,PUMP ADDITIONAL 88 BBLS OF DIESEL FOLLOWED BY 34 BBLS OF 9.8 PPG HEATED BRINE,LEAVING THE ENTIRE 13-3/8" BY 9-5/8"ANNULUS DIESEL PACKED -ALL CIRCULATION AT 2-5 BPM WITH ICP 300-500 PSI,FCP-30 PSI. -SHUT IN AND ALLOW DIESEL TO SOAK IN THE 13-3/8"BY 9-5/8"ANNULUS FOR ONE HOUR. PERFORM POST JARRING DERRICK INSPECTION -PUMP 185 BBLS OF 9.8 PPG HEATED BRINE, FOLLOWED BY 40 BBLS OF DEEP CLEAN -- PILL,FOLLOWED BY 25 BBLS OF HIGH VIS SWEEP. DISPLACE ALL FLUIDS OUT WITH 242 BBLS OF 8.5 PPG NON HEATED SEAWATER. -DRAIN STACK AND PUMP TO TIGER TANK 07:00 - 09:30 2.50 FISH. C DECOMP POOH WITH FISHING BHA WITH 4"DP AND CUTTER FISH FROM 2,034'MD TO 329'MD -MONITOR WELL FOR 10 MIN:STATIC -P/U 75K,S/O 75K AT 1000'MD -MONITOR WELL ON TRIP TANK:PROPER HOLE FILL 09:30 - 12:30 3.00 FISH C DECOMP LAY DOWN FISHING BHA PER BAKER FROM 329'MD TO SURFACE -MONITOR WELL FOR 10 MIN:STATIC -PULL FISH AND OVERSHOT TO FLOOR -PULL 4"DP SINGLE WITH CUTTER BHA TO FLOOR,LAY DOWN CUTTER BHA -RELEASE 4"DP CUT JOINT FROM OVERSHOT AND LAY DOWN TO SHED -BREAK DOWN OVERSHOT AND LAY DOWN FISH AND TOOLS 12:30 - 14:00 1.50 FISH C DECOMP BRING CASING TOOLS TO RIG FLOOR -RIG UP CASING TONGS AND EQUIPMENT TO PULL 9-5/8"CASING 14:00 - 14:30 0.50 FISH C DECOMP MAKE UP SPEAR WITH GRAPPLE PER BAKER TO PULL 9-5/8"CASING -P/U TWO JOINTS OF 5"DP -5'IN HOLE AND ENGAGE CASING 14:30 - 16:00 1.50 FISH C DECOMP PULL 9-5/8"CASING FROM WELLHEAD TO 12' FROM SURFACE -BACK OUT LOCK DOWN SCREWS PER CAMERON -UNSEAT PACKOFF AND HANGER AT 150K, P/U 118KAND S/O 121K -PULL HANGER 33.5'FROM WELLHEAD INTO BOP STACK AND PULL 30K OVER -PUMP OUT STACKAND ATTEMPT TO CENTER HANGER AND WORK PIPE,WITH NO SUCCESS Printed 3/28/2016 1 04 57PM *AII depths reported in Drillers Depths* North America ALASKA BP a 33 of 52 i Page Operation Summary Report Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UW:500292068600 Active datum:R-16A actual©65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:00 - 17:00 1.00 FISH C DECOMP LAND 9-5/8"HANGER AND PACKOFF -RIH AND ENGAGE PACKOFF -PULL PACK-OFF FREE AT 47K AND LAY DOWN 17:00 - 18:30 1.50 CASING C DECOMP MAKE UP SPEAR AND ENGAGE 9-5/8" HANGER AND PULL -PULL 9-5/8"HANGER TO 33.5'UP FROM WELLHEAD AND ENCOUNTER 30K OVERPULL WORK UP TO 100K OVERPULL IN 10K INCREMENTS 18:30 - 19:00 0.50 CASING X WAIT DECOMP CONSULT ODE AND WELLS SUPERINTENDENT FOR PLAN FORWARD -PREP 7"CASING IN PIPE SHED 19:00 - 20:30 1.50 CASING C DECOMP WORK PIPE TO 100K OVER PULL WHILE CIRCULATING -12 BPM,50 PSI 20:30 - 22:30 2.00 CASING C DECOMP LAND 9-5/8"HANGER AND LAY DOWN SPEAR -M/U PACKOFF,RIH AND RILDS PER CAMERON SET 9-3/16"ID WEAR RING -RIG DOWN DOYON POWER TONGS 22:30 - 23:30 1.00 FISH C DECOMP MAKE UP CUTTER BHA PER BAKER REP AND RUN IN HOLE TO 845'MD RIH ON ELEVATORS WITH 5"DP FROM DERRICK -P/U 52K,S/O 54K -MONITOR WELL ON TRIP TANK:PROPER DISPLACEMENT 23:30 - 00:00 0.50 FISH C DECOMP LOCATE COLLARS AT 882'MD AND 845'MD WITH CUTTERS PER BAKER -3.5 BPM,245 PSI 2/8/2016 00:00 - 01:30 1.50 FISH C DECOMP CUT 9-5/8"CASING AT 860'MD -80 RPM,1K-4K TORQUE -190 GPM,550-650 PSI -STALL AT 5K,PICK UP 5'AND RUN IN TO VERIFY CUT LOCATION -CONTINUE TO CUT AT 70 RPM,1K-3K TORQUE -PRESSURE INCREASE TO 1170 PSI AND STALL OUT AT 6K TORQUE,SHUT DOWN PUMPS AND ROTARY -PICK UP 5'AND RUN INTO VERIFY CUT LOCATION -CONTINUE TO CUTAT 70 RPM,1 K-3K TORQUE -4 STKS/MIN,200-300 PSI -POSITIVE INDICATION OF CUT PIPE THROUGH PRESSURE DROP INDICATOR IN TOOL 01:30 - 03:00 1.50 FISH C DECOMP POOH WITH CUTTER BHA FROM 860'MD TO SURFACE -MONITOR WELL FOR 10 MIN:STATIC -P/U 45K,S/0 45KAT 550'MD -MONITOR WELL ON TRIP TANK:PROPER HOLE FILL -LAY DOWN CUTTER BHA PER BAKER REP Printed 3/28/2016 1.04:57PM *AII depths reported in Drillers Depths` North America-ALASKA-BPl' 7"-'4 '1 ' „�.,,44//4' �� .: .' Operation Summary Report � Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UW:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT i NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 04:00 1.00 WHSUR C DECOMP PULL PACK-OFF AND WEAR RING -RIH AND ENGAGE PACK-OFF -BACK OUT LOCK DOWN SCREWS PER CAMERON -PULL PACK-OFF TO SURFACE -PULL WEAR RING 04:00 - 07:00 3.00 FISH C DECOMP MAKE UP SPEAR WITH GRAPPLE PER BAKER TO PULL 9-5/8"CASING PICK UP TWO JOINTS OF 5"DP 5'IN HOLE AND ENGAGE CASING P/U 72K TO UNSEAT HANGER P/U HANGER 33'AND COULD NOT CONTINUE -WORKED THROUGH TIGHT SPOT PULLING IN 10K INCREMENTS TO 100K OVER UP WEIGHT PER WSLAND BAKER REP -5/8"STRING WEIGHT:33K 07:00 - 11:30 4.50 FISH C DECOMP POOH AND LAY DOWN 9-5/8"HANGER& CASING FROM 860'MD TO SURFACE -21 FULL JOINTS AND 1 CUT JOINT=15.51' -60K-80K OVERPULL EVERY 37' MONITOR WELL ON TRIP TANK:PROPER HOLE FILL 11:30 - 12:00 0.50 _ FISI4 C DECOMP CLEAN AND CLEAR RIG FLOOR -BRING TOOLS FOR FISHING BHA TO RIG FLOOR 12:00 - 13:00 1.00 FISH C DECOMP MAKE UP 9-5/8"CASING FISHING BHA PER BAKER REP -MAKE UP SPEAR AND JARS 13:00 - 13:30 0.50 FISH C"" DECOMP RIH WITH 9-5/8"CASING FISHING BHA FROM SURFACE TO 855'MD -RIH ON 5"DP STANDS FROM DERRICK -P/U 62K,S/O 69K AT 850'MD ENCOUNTER TIGHT SPOT AT—300'MD -MAKE UP TOP DRIVE SET DOWN 10K TO WORK THROUGH TIGHT SPOT -MONITOR WELL ON TRIP TANK:PROPER DISPLACEMENT 13:30 - 14:00 0.50 FISH C DECOMP ESTABLISH CIRCULATION -4 BPM,50 PSI -ENGAGE FISH AT 874'MD -P/U 113K,S/O 120KAT 860'MD 14:00 - 15:00 1.00 FISH C DECOMP CIRCULATE DEEP CLEAN AND HI-VIS SWEEP SURFACE TO SURFACE -PUMP 40 BBL DEEP CLEAN SWEEP -PUMP 40 BBL HI-VIS SWEEP -8-10 BPM,105-160 PSI -RECIPROCATE PIPE 30' -RIG UP CASING EQUIPMENT PER DOYON 15:00 - 16:00 1.00 FISH C DECOMP POOH W/9-5/8"SPEAR ASSEMBLY ON ELEVATORS FROM 874'MD TO SURFACE -MONITOR WELL FOR 10 MIN:STATIC -P/U 100K,S/O 102 AT 300'MD -LAY DOWN CUT JOINT AND SPEAR PER BAKER -CUT JOINT LENGTH=22.01' -MONITOR WELL ON TRIP TANK:PROPER HOLE FILL Printed 3/28/2016 1:04.57PM *All depths reported in Drillers Depths* 411° ::::::zof 52 rt Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor.PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:00 - 20:30 4.50 FISH C DECOMP POOH WITH 9-5/8"CASING -MONITOR WELL FOR 10 MIN:STATIC -LAY DOWN 32 JOINTS OF 9-5/8"CASING AND 1 CUT JOINT AT 14.93' -5-10K OVER PULL EVERY 37' -OVER PULL GONE AFTER FIRST 10 JOINTS -MONITOR WELL ON TRIP TANK:PROPER HOLE FILL 20:30 - 21:00 0.50 FISH C DECOMP ,,CLEAN AND CLEAR RIG FLOOR RIG DOWN DOYON CASING TOOLS AND SEND OUT TOOL CRANE -PICK UP BAKER TOOLS TO RIG FLOOR 21:00 - 21:30 0.50 FISH C DECOMP BREAK DOWN BAKER SPEAR ASSY. -BREAK AND REMOVE FISH,LAY DOWN. 21:30 - 22:00 0.50 WHSUR C DECOMP SET'WEAR RING -SET 12-1/4"ID WEAR RING -RUN IN LOCK DOWN SCREWS PER CAMERON REP 22:00 - 22:30 0.50 FISH C DECOMP RIG,SERVICE GREASE WASH PIPE,BLOCKS AND CROWN, CHECK TOP DRIVE OIL 22:30 - 00:00 1.50 FISH C DECOMP MAKE UP 9-5/8" DRESS OFF BHA WITH STRING MILL PER BAKER TO 237' RIH WITH 9-5/8"CASING DRESS OFF BHA FROM SURFACE TO 253' -MONITOR WELL ON TRIP TANK:PROPER DISPLACEMENT 2/9/2016 00:00 - 01:00 1.00 FISH C DECOMP RIH WITH 9-5/8"CASING DRESS OFF BHA FROM SURFACE FROM 253'TO 2,103' -TAG TOP OF 9-5/8"ON DEPTH AT 2,103' -MONITOR WELL ON TRIP TANK:PROPER DISPLACEMENT 01:00 - 03:00 2.00 FISH C.., DECOMP DRESS OFF TOP OF 9-5/8"STUB AT 2,103' -ESTABLISH PARAMETERS -PUW-90K,SOW-95K,ROT-94K -8 BPM,130 PSI,FREE TQ-1K-1.5K,MILL TQ-1.5K TO 3K -PUMP 40 BBL DEEP CLEAN SWEEP FOLLOWED BY 40 BBL HIGH VIS SWEEP -CIRCULATE SURFACE TO SURFACE WITH CLEAN 8.5 PPG SEAWATER -CIRCULATE UNTIL RETURNS CLEAN 8.5 PPG SEAWATER IN/OUT -MONITOR WELL 10 MIN-WELL STATIC. 03:00 - 07:30 4.50 FISH C DECOMP POOH WITH 9-5/8"DRESS OFF ASSEMBLY -POOH FROM 2,103'TO 253'MD MD ON 5"DP LAYING DOWN TO THE PIPE SHED. -MONITOR TRIP ON TRIP TANK-CORRECT HOLE FILL OBSERVED. -LAY DOWN BHA FROM 253'MD PER BAKER REP DIRECTION 07:30 - 08:00 0.50 CASING C DECOMP CLEAN AND CLEAR RIG FLOOR -SEND BHA OFF THE RIG FLOOR. 08:00 - 09:30 1.50 CASING C DECOMP CHANGE OUT SAVER SUB -CHANGE FROM 4-1/2"IF TO XT-39 09:30 - 10 00 0.50 CASING C DECOMP RIG SERVICE -GREASE TOP DRIVE,POWER SLIPS, SERVICE ST-80 Printed 3/28/2016 1:04.57PM •AII depths reported in Drillers Depths* „, rth• Noi merica-ALASKA-b6 ` '// Page 36 of 52 /' Operation Summary Report � � Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3 017HY C:(8,196,253 00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor.PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To I Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:00 - 12:00 2.00 CLEAN C DECOMP MAKE UP CLEAN OUT BHA FOR 7”LINER TOP CLEAN OUT -MAKE UP BHA PER BAKER REP TO 325' "24 HOUR BOPE TEST NOTICE GIVEN TO AOGCC AT 11:00 ON 02/09/2016" 12:00 - 13:30 1.50 CLEAN C DECOMP RIH WITH 7"CLEAN OUT BHA -RIH WITH BHA ON 4"DP STANDS FROM THE DERRICK FROM 325'MD TO 2,120' -MONITOR TRIP ON TRIP TANK-CORRECT DISPLACEMENT OBSERVED 13:30 - 14:00 0.50 CLEAN C DECOMP DISPLACE WELL WITH 10.7 PPG LSND MUD -DISPLACE SEAWATER OUT OF THE HOLE WITH 10.7 PPG LSND FROM 2,120'TO 'SURFACE.10.7 PPG MUD ALREADY BELOW 2,120'MD -8 BPM,1230 PSI, -CIRCULATE UNTIL 10.7 PPG LSND IN/OUT -ZERO LOSSES. 14:00 - 16:30 2.50 CLEAN C DECOMP RIH WITH 7"CLEAN OUT BHA FROM 2,120'MD TO 6,893 MD -RIH ON 4"STAND FROM THE DERRICK.TAG UP ON EZSV ON DEPTH AT 6,893'MD. MONITOR TRIP ON TRIP TANK-CORRECT DISPLACEMENT OBSERVED. -PUW-119K,SOW-107K 16:30 - 20:00 3.50 CLEAN C DECOMP CLEAN OUT THE INSIDE OF THE 7"LINER TOP AT 6,893'MD -ACTIVATE REVERSE CIRCULATING JUNK BASKET BY DROPPING 7/8"ACTIVATION BALL -CIRCULATE 2.5 BOTTOMS UP WITH 20 BBL HIGH VIS SWEEP -6 BPM,2440 PSI. -MONITOR WELL TEN MIN-WELL STATIC -ZERO LOSSES DURING CIRCULATION 20:00 - 23:00 3.00 CLEAN C DECOMP POOH ON ELEVATORS WITH 7"CLEAN OUT BHA FROM 6,893 MD -POOH FROM 6,893'MD TO 325'MD -MONITOR TRIP ON THE TRIP TANK- CORRECT HOLE FILL OBSERVED 23:00 - 00:00 1.00 CLEAN C DECOMP PULL AND LAY DOWN CLEAN OUT BHAAS DIRECTED BY BAKER REP.F/325'MD TO SURFACE -MONITOR WELL 10 MIN PRIOR TO PULLING BHA THRU THE STACK.-WELL STATIC -BREAK AND CLEAN OUT BOOT BASKETS. 2/10/2016 00:00 - 00:30 0.50 CLEAN C DECOMP BREAK DOWN CLEAN OUT BHA -BREAK AND CLEAN OUT BOOT BASKETS. -RETRIEVED-5 LBS OF METAL SHAVINGS AND 2 LARGE CHUNKS OF METAL. 00:30 - 01:30 1.00 BOPSUR C DECOMP PULL WEAR RING&RINSE THE BOP STACK -CIW BACK OUT LOCK DOWN SCREWS.PULL WEAR RING AND LAY DOWN -RU STACK WASHER TO JOINT OF DP RIH AND RINSE THE STACK.WITH SEAWATER. -680 GPM,160 PSI -SET THE TEST PLUG Printed 3/28/2016 1 04 57PM `AII depths reported in Drillers Depths* �� t,., Pae 37 of 52 }} North America-ALASKA-BP Page Operation Summary Report /zzx Common Well Name R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual©65.85usft(above Mean Sea Level) Date From-To j Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 04:00 2.50 BOPSUR C DECOMP CHANGE OUT THE UPPER BOPE RAMS -CHANGE RAMS FROM 9-5/8"FIXED BORE RAMS TO 7"FIXED BORE -PRESSURE TEST RAMS TO 250 PSI LOW, 3500 PSI HIGH CHARTED. 04:00 - 05:00 1.00 CASING C DECOMP RIG UP TO RUN 7"26#,L-80 VT HC TIE BACK CASING INSTALL PS-21 SLIPS WITH 7" RU 7"SIDE DOOR ELEVATORS, RU AND TEST CASING TONGS&TORQUE TURN EQUIPMENT. -DRILLER AND LEAD FLOOR HAND VERIFIED CORRECT SIZE LIFTING EQUIPMENT AND CORRECT TONG HEAD SIZE FOR CASING TONGS. -RIG UP FILL UP HOSE. -WSL,DRILLER,TOOL PUSHER&THIRD PARTY HANDS TO VERIFY PIPE COUNT IN PIPE SHED PRIOR TO RUN. 05:00 - 14:30 9.50 CASING C DECOMP RUN 7"26#,L-80 VT HC TIE BACK CASING FROM SURFACE TO 6812'MD -CHECK FLOATS,WSL VERIFY GOOD USE JET LUBE SEAL GUARD ON ALL CONNECTIONS -TORQUE CONNECTIONS TO 11,950 FT-LBS -RUN 165 JOINTS OF 7"CASING -RUN 110 FLOATING CENTRALIZERS ON JOINTS 3-112 -RUN IN HOLE AT 120 FT/MIN FROM SURFACE TO 2100'MD -RUN IN HOLE AT 80 FT/MIN FROM 2100'MD TO 4400'MD -RUN IN HOLE AT 90 FT/MIN FROM 4400'MD TO 6812'MD -OBTAIN P/U AND S/O WEIGHTS EVERY 1000' MD -P/U 123K,S/O 116KAT 4000'MD -P/U 173K,S/O 147K AT 6775'MD -MUD WEIGHT:10.7 PPG IN,10.7 PPG OUT -MONITOR WELL ON TRIP TANK:PROPER DISPLACEMENT -NO LOSSES OBSERVED ON TRIP IN HOLE 14:30 - 16:00 1.50 CEMT C DECOMP MAKE UP CROSS OVER AND CEMENT HEAD TO 7"CASING -RIG DOWN CASING TOOLS -VERIFY CEMENT PLUGS LOADED IN CEMENT HEAD 16:00 - 17:00 1.00 CEMT C DECOMP STAGE UP TO CEMENTING RATE IN 1 BPM INCREMENTS TO FINAL CIRCULATION RATE OF 6 BPM -2 BPM,210 PSI,100%RETURN FLOW -3 BPM,285 PSI,100%RETURN FLOW -4 BPM,320 PSI,100%RETURN FLOW -5 BPM,400 PSI,100%RETURN FLOW -6 BPM,495 PSI,100%RETURN FLOW -ICP:495 PSI,FCP:459 PSI AT 6 BPM -MUD WEIGHT:10.7 PPG IN,10.7 PPG OUT -CIRCULATE TOTAL OF ONE BOTTOMS UP -NO LOSSES OBSERVED WHILE CIRCULATING Printed 3/28/2016 1.04.57PM `AII depths reported in Drillers Depths* /.. North •America-ALASKA-BP `'. Page 38 of 52 ,.... ,, Operation Summary Report :'4 f Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:OOAM Rig Release 2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT ' NPT Depth Phase Description of Operations (hr) (usft) 17:00 - 20:30 3.50 CEMT C DECOMP CEMENT T 26#,L-80 VT HC TIE BACK CASING AS FOLLOWS: -FILL LINES WITH WATER AND PRESSURE TEST TO 300 PSI/4500 PSI FOR 5 MINUTES EACH -PUMP 50 BBLS OF 11.0 PPG MUDPUSH II SPACER AT 5.0 BPM,285 PSI SHUT DOWN,RELEASE BOTTOM PLUG -PUMP 370 BBLS OF 15.8 PPG CLASS G CEMENTAT 5.0 BPM,EXCESS VOLUME 10% (YiSK.) -(CORRECTED:YIELD IS 1.17 CU CU.FT/SK ACCORDING TO SLB FINAL REPORT) -SHUT DOWN,DROP TOP PLUG PUMP 10 BBLS FRESH WATER ON TOP OF PLUG AND CLEAR LINES PERFORM DISPLACEMENT WITH RIG WITH 10.7 PPG LSND MUD PER SLB CADE -PUMP 190&BLS AT 5 BPM,ICP 200 PSI,FCP 1970 PSI -SLOW RATE TO 2 BPM AND PUMP 10 BBLS -OPEN OAAND SHUT ANNULAR,TAKE RETURNS TO LINED CELLAR BOX -INCREASE RATE TO 5 BPM -PUMP 50 BBLS AT 5 BPM,ICP 1570 PSI,FCP 2545 PSI -SLOW RATE TO 2 BPM TO PUMP PLUG -PUMP 10 BBLS AT 2 BPM,ICP 1570 PSI,FCP 1970 PSI -BUMP PLUG AT 260 BBLS TOTAL DISPLACED -100%RETURNS FOR ENTIRE CEMENT JOB -30 BBLS OF CEMENT RETURNS TO CELLAR -PICK UP STRING TO NEUTRAL WEIGHT:P/U 192K,S/O 113K -BLEED OFF PRESSURE AND CHECK SEALS: GOOD -CEMENT WETAT 17:38 HRS. -CEMENT IN PLACE AT 20:30 HRS. 20:30 - 22:00 1.50 CEMT C DECOMP RIG DOWN CEMENTING EQUIPMENT -RIG DOWN CEMENT HEAD AND BAIL EXTENSIONS -FLUSH STACKAND ANNULUS VALVES -DRAIN 7"CASING STUMP PRIOR TO CUT 22:00 - 00:00 2.00 WHSUR C DECOMP PREP WELLHEAD FOR CUTTING CASING AND SETTING SLIPS -SPLIT STACK BETWEEN TUBING AND CASING SPOOL -LIFT STACK UP TO SET SLIPS Printed 3/28/2016 1 04 57PM `AII depths reported in Drillers Depths* North America-ALASKA BP.,% ag of s2 Operation Summary Report „ , Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor.PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual©65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/11/2016 00:00 - 06:00 6.00 WHSUR C DECOMP INSTALL 7”EMERGENCY SLIPS PER CAMERON -SLACK OFF 155K ON SLIPS WITH PRIMARY SEAL IN CASING HEAD -RUN IN LOCK DOWN SCREWS PER CAMERON -ONE LDS SHEARED OFF WHILE INSTALLING. - BLANKING PLUG INSTALLED IN PLACE OF SHEARED LDS. MAKE CUT ON 7"CASING WITH WACHS CUTTER -LAY DOWN TOP SECTION OF 7"CASING -INSTALL MCEVOY SSI-1 TUBING SPOOL WITH YBT SECONDARY SEAL NIPPLE UP WELLHEAD -RUN IN LOCK DOWN SCREWS PER CAMERON 06:00 - 09:30 3.50 BOPSUR C DECOMP NIPPLE UP RISERRAND BOP -PJSM WITH RIG CREWAND CAMERON -INSTALL TEST PLUG IN TUBING SPOOL AND RUN IN LDS PER CAMERON -NIPPLE UP BOP STACKAND RISER CHANGE OUT UPPER RAMS FROM 7"FIXED TO 2-7/8"X 5-1/2"VBRS 09:30 - 12:00 2.50 BOPSUR P DECOMP RIG UP FOR BOP TEST -PJSM - FILL LINES AND MUD GAS SEPARATOR -BLEED AIR OUT OF LINES -BODY TEST BOPE AND CHECK FOR LEAKS 12:00 - 16:30 4.50 BOPSUR P DECOMP PRESSURE TEST BOP -NOTIFIED STATE MINIMUM 24HRS PRIOR TO BOP TEST.TEST WITNESSED BY AOGCC FIELD INSPECTOR JOHNNIE HILL,BP WSL, AND PARKER TOOL PUSHER. TEST BOP ACCORDING TO AOGCC,BP REGULATIONS,AND PARKER PROCEDURES -PRESSURE TEST BOP RAMS TO 250 PSI AND 3500 PSI FOR 5 MINUTES EACH -TEST UPPER AND LOWER 2-7/8"X 5-1/2" VBRS WITH 2-7/8"AND 4-1/2"TEST JOINTS. -PRESSURE TEST BOP ANNULAR PREVENTER TO 250 PSI AND 3500 PSI FOR 5 MINUTES WITH 2-7/8"TEST JOINT. -ALL TESTS CHARTED -ALL TESTS PASSED BP AND AOGCC CRITERIA 16:30 - 17:30 1.00 BOPSUR P DECOMP RIG DOWN BOP TEST EQUIPMENT -BLOW DOWN LINES -BOLDS AND PULL TEST PLUG PER CAMERON REP -SET 9-3/16"ID WEAR RING,RILDS PER CAMERON REP 17:30 - 18:00 0.50 BOPSUR P DECOMP DAILY RIG SERVICE -GREASE WASHPIPE,BLOCKS AND CROWN, INSPECT SAVER SUB,CHECK OIL IN TOP DRIVE Printed 3/28/2016 1 04.57PM *AII depths reported in Drillers Depths* ..i�. ✓jam'/!l l'.,,.f.!;- � •� �/'-' North America-ALASKA BPS r,F �,� ;Page ao of s2 Operation Summary Report Common Well Name R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 20:00 2.00 CASING P INTI MAKE UP 6-1/8"MOTOR BHA#8 WITH INSERT BIT PER SLB DD AND MWD FROM SURFACE TO 443'MD -PJSM WITH CREWAND SLB MWD/DD -DIAL DOWN MOTOR TO 1.59 DEGREE BEND -MU MOTOR BHA PER PARKER/SLB PROCEDURES OVERALL LENGTH OF BHA.1,390 FT -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 20:00 - 00:00 4.00 CASING P INTI RUN IN HOLE WITH 6-1/8"DRILLING BHA FROM 443'MD TO 6,150'MD -PERFORM SHALLOW HOLE TEST AT 1,450' MD.202 GPM,1056 PSI.PASSING TEST. RIH ON ELEVATORS WITH 4"DP FROM THE DERRICK -BREAK CIRCULATION EVERY 2,000'MD,175 GPM,850 PSI -PU 121K,SO 99K AT 6,150'MD MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 2/12/2016 00:00 - 00:30 0.50 CASING P INTI RUN IN HOLE WITH 6-1/8"DRILLING BHA FROM 6,150'MD TO 6,500'MD -RIH ON ELEVATORS WITH 4"DP FROM THE DERRICK -BREAK CIRCULATION AT 6,500 175 GPM,850 PSI -PU 122K,SO 100KAT 6,500'MD -MUD WEIGHT:10.3 PPG IN,10.3 PPG OUT -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 00:30 - 06:00 5.50 CASING C INTI WASH DOWN AND DRILL TIEBACK PLUGS, FLOAT,CEMENT,AND EZSV -250 GPM,1475 PSI -20 RPM,4K TORQUE -DRILL TOP PLUG AT 6,595'MD -FIRM CEMENT BETWEEN PLUGS -BOTTOM PLUG IN FLOAT COLLAR AT 6,789' MD -EZ DRILL PLUG AT 6,895'MD 06:00 - 07:00 1.00 DRILL P INTI CIRCULATE 1.5 BOTTOMS UP -250 GPM,1940 PSI -20 RPM,5K TORQUE -PUMP HI-VIS SWEEP:NO NOTICABLE CUTTINGS IMPACT 07:00 - 09:30 2.50 DRILL P INTI RUN IN HOLE WITH 6-1/8"MOTOR DRILLING BHA#8 FROM 6,966'MD TO 11,120'MD -RIH ON ELEVATORS WITH 4"STANDS FROM THE DERRICK -FILL PIPE EVERY 20 STANDS.190 GPM,1500 PSI AT 8,875'MD -MUD WEIGHT:10.5 PPG IN,10.5 PPG OUT -PU 196K,SO 121KAT 10,825 -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 09:30 - 10:30 1.00 DRILL P INTI WASH DOWN FROM 11,120'MD TO 11,319'MD -200 GPM,1890 PSI -20 RPM,12K TORQUE -TAG CEMENT AT 11,319'.45'ABOVE LANDING COLLAR. Printed 3/28/2016 1.04:57PM *AII depths reported in Drillers Depths* North America-ALASKA-BPS Operation Summary Report :: 1;; f F Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date.2/23/2016 X3-017HY-C:(8,196,253 00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task 1 Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:30 - 11:30 1.00 DRILL P INTI CIRCULATE BOTTOMS UP -250 GPM,2375 PSI -20 RPM,12K TORQUE 11:30 - 13:00 1.50 DRILL P INTI PRESSURE TEST 7"CASING -PRESSURE TEST 7"CASING TO 250 PSI LOW FOR 5 MINUTES/3500 PSI HIGH FOR 30 MINUTES:PASSING -OBTAIN SUPERINTENDENT PERMISSION TO PROCEED 13:00 - 15:30 2.50 DRILL P INTI DRILL CEMENT AND SHOE TRACK FROM 11,319'MD TO 11,446'MD,10 FT PRIOR TO SHOE. -PLUG AT 11,335'MD -LANDING COLLAR AT 11,365'MD 250 GPM,2535 PSI -PU 223K,SO 118K,ROT 140K -60 RPM,10-12K TORQUE ON,9K TORQUE OFF 15:30 - 16:30 1.00 DRILL P INTI DISPLACE WELL FROM 10.7 PPG LSND TO 8.5 PPG FLO-PRO -PUMP 30 BBL STEEL LUBE SWEEP -PUMP 30 BBL HI-VIS FRESH WATER SPACER 250 GPM,2485 PSI 40 RPM,5-11K TORQUE -OBTAIN SPRAT 11,445'MD(8,795'TVD)AND MW 8.5 PPG. 16:30 - 17:30 1.00 DRILL P INTI PERFORM NEGATIVE PRESSURE TEST PASSING -MONITOR WELLBORE FOR 30 MINUTES STATIC -RECEIVE SUPERINTENDENT APPROVAL TO PROCEED ""SIMOPS"" -CUT AND SLIP DRILLING 60 FT DRILLING LINE -CALIBRATE DRAWWORKS IN AMPHION, CALIBRATE MWD DEPTH TRACKING TOOL, CHECK CROWN SAVER 17:30 - 19:30 2.00 DRILL P INTI DRILL REMAINDER OF SHOE TRACK PLUS 20' OF NEW FORMATION.FROM 11,446'MD TO 11,478'MD. -250 GPM,1600 PSI -40 RPM,5K TORQUE ON,3K TORQUE OFF -PU 177K,SO 142K,ROT 153K -MUD WEIGHT:8.5 PPG IN,8.5 PPG OUT -MONITOR WELL FOR 15 MINUTES AFTER DRILLING SHOE TRACK:STATIC 19:30 - 20:30 1.00 DRILL P INTI CIRCULATE BOTTOMS UP -PULL INTO SHOE -250 GPM,1475 PSI -40 RPM,5K TORQUE -MONITOR WELL FOR 15 MINUTES:STATIC 20:30 - 21:30 1.00 DRILL P INTI RIG UP AND PERFORM FIT -11,432'MD(8,882'TVD)MUD WEIGHT:8.5 PPG -PUMP 1 BBL TO 605 PSI,BLED BACK 1 BBL -FIT EMW:9.82 PPG -RECEIVE ODE CONFIRMATION OF 7"WBE RESULTS.PERMISSION TO PROCEED. Printed 3/28/2016 1:04:57PM *All depths reported in Drillers Depths* North America ALASKA_B '• '' ai / gJof 52 euuruiurii�, Operation Summary Report Common Well Name R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time 1/8/1982 12.00 00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UW:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Descnption of Operations (hr) (usft) 21:30 - 00:00 2.50 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE WITH 1.59DEG MOTOR BHA#8 FROM 11,478'MD TO 11,530'MD -245 GPM,1555 PSI ON,1485 PSI OFF -PU 180K,SO 147K -SURVEY EVERY 30 FT —ACTUAL SLIDE TIME:2HRS TOTAL BIT TIME:2 HRS 2/13/2016 00:00 - 12:00 12.00 DRILL P PROD1 DRILL AHEAD IN 6-1/8"PRODUCTION HOLE WITH 1.59 DEG MOTOR BHA#8 FROM 11,530' MD 253 GPM,1587 PSI ON,1508 PSI OFF -PU 180K,SO 136K,ROT 156K AT 11,585'MD - 40 RPM,5K TORQUE ON,3K TORQUE OFF SURVEY EVERY 30' -MUD WEIGHT:8.5 PPG IN,8.5 PPG OUT -ACTUAL ROTATE TIME:1.65 HRS TOTAL BIT TIME:5.45 HRS -SPR'S TAKEN AT 11,445'MD,8,795'TVD, MW-8.5 PPG 12:00 - 23:30 11.50 DRILL P PROD1 DRILLAHEAD IN 6-1/8"PRODUCTION HOLE WITH 1.59 DEG MOTOR BHA#8 FROM 11,530' MD TO 11,986'MD -245 GPM,1785 PSI ON,1735 PSI OFF -PU 185K,SO 136K,ROT 148KAT 11,986'MD - 20 RPM,7K TORQUE ON,6K TORQUE OFF -SURVEY EVERY 30' -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -ACTUAL ROTATE TIME:2.46 HRS TOTAL BIT TIME:16.71 HRS 23:30 - 00:00 0.50 DRILL P PROD1 DAILY RIG SERVICE -GREASE WASH PIPE,BLOCKS,ROLLER ASSEMBLY,CROWN CLUSTER. 2/14/2016 00:00 - 02:00 2.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE WITH 1.59 DEG MOTOR BHA#8 FROM 11,986'MD TO 12,023'MD -245 GPM,1800 PSI ON,1735 PSI OFF -20 RPM,7K ON,6K OFF -PU 191K,SO 134K,ROT 150KAT 12,023'MD -SURVEY EVERY 30 FT -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -TOUR ROTATE TIME:0.28 HRS -TOUR SLIDE TIME:0.84 HRS -TOTAL BIT TIME:17.83 HRS -OBTAIN SPRS AT 12,023'MD(9,012'TVD)AT 8.6 PPG MW 02:00 - 03:30 1.50 DRILL P PROD1 CIRCULATE BOTTOMS UP X 2 -265 GPM,1650 PSI 20 RPM,6K TORQUE -MONITOR WELL 10 MIN-WELL STATIC -SLIGHT SEEPAGE TO THE WELL--1 BPH Printed 3/28/2016 1.04:57PM *All depths reported in Drillers Depths* North America-ALASKA-BPS � ; - ;Vase 43 of 52 yi a � Operation Summary Report ,-. Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 1X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual(g65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:30 - 11:00 7.50 DRILL P PROD1 POH WITH 1.59 DEG MOTOR BHA#8 TO PICK UP ARCHER RSS BHA. -POOH STANDING BACK FROM 12,023'TO 11,456',MONITOR WELLAT THE SHOE-WELL STATIC -POOH FROM 11,456'MD TO 1238',MONITOR WELL PRIOR TO NON SHEARABLES-WELL STATIC POOH FROM 1,238'TO 171'MONITOR WELL- STATIC - PULL AND LAY DOWN BHAAS DIRECTED BY SLB DD/MWD -MONITOR TRIP ON TRIP TANK-CORRECT HOLE FILL OBSERVED. _ 11:00 - 11:30 0.50 DRILL P PROD1 CLEAN AND CLEAR -CLEAR RIG FLOOR OF BHA&PREPARE TO PU RSS BHA. 11:30 - 13:00 1.50 DRILL P PROD1 MAKE UP 6-1/8"ARCHER RSS BHA#9 WITH SMITH STINGER BIT PER SLB DD AND MWD FROM SURFACE TO 181'MD -PJSM WITH CREWAND SLB MWD/DD -MU&RIH W/ ARCHER BHA PER PARKER /SLB PROCEDURES FROM 181'TO 453' -OVERALL LENGTH OF BHA 181' FT -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 13:00 - 21:30 8.50 DRILL P PROD1 RIH WITH 6-1/8"ARCHER RSS BHA#9 -RIH ON 4"DP STAND FROM THE DERRICK FROM 453'MD TO 12,023' -SHALLOW HOLE TEST MWD AT 1,500'MD: NO FAILURES -BREAK CIRCULATION&FILL PIPE EVERY 1800'W/260 GPM,1600 PSI -PUW-176K,SOW-143K,AT 11,400' -WASH AND REAM DOWN FROM 11,793'MD TO 12,023'MD -250 GPM,40 RPM -TAKE CHECK SHOT SURVEYS PER JORPS/ SLB MWD -RE-SHOOT SEVERAL SURVEYS FOR DISCREPANCY 21:30 - 00:00 2.50 DRILL N DFAL 12,023.00 PROD1 TROUBLE SHOOT SURVEY DIFFERENCE FROM PREVIOUS BHA -RE-SHOOT SEVERAL SURVEYS -RACK ONE STAND BACK AND ROLL PUMPS WHILE RECIPROCATING PIPE ONE FULL STAND -MAKE CALL TO ODE FOR PLAN FORWARD -WAIT ON DECISION FROM ENGINEERING GROUP 2/15/2016 00:00 - 01:00 1.00 DRILL N DFAL 12,023.00 PROD1 POH IN OPEN HOLE WITH ARCHER RSS BHA #9 TO PICK UP NEW BHA FROM 12,023'MD TO 11,450'MD -MONITOR WELL FOR 10 MINUTES:STATIC -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -PU 185K,SO 140KAT 11,950'MD -PUMP DRY JOB AT 11,450'MD -MONITOR WELL VIA TRIP TANK.PROPER DISPLACEMENT Printed 3/28/2016 1.04:57PM *AII depths reported in Drillers Depths* f • • North America-ALASKA-BP; • erf`y{ �4 of 52 Operation Summary Report Common Well Name:R-16 r AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date 2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:00 - 05:30 4.50 DRILL N DFAL 12,023.00 PROD1 POH IN CASED HOLE WITH ARCHER RSS BHA #9 TO PICK UP NEW BHA FROM 11,450'MD TO 200'MD -PU 175K,SO 140KAT 11,450'MD -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -MONITOR DISPLACEMENT VIA TRIPTANK PROPER DISPLACEMENT 05:30 - 07:00 1.50 DRILL N DFAL 12,023.00 PROD1 LAY DOWN ARCHER RSS BHA#9 FROM 200' MD PJSM WITH RIG CREWAND SLB DD/MWD -MONITOR WELL 10 MINUTES PRIOR TO PULLING NON-SHEARABLES ACROSS STACK: STATIC -OVERALL LENGTH OF BHA:181' FT -CLEAN AND CLEAR RIG FLOOR 07:00 - 08:30 1.50 DRILL N DFAL 12,023.00 PROD1 PICK UP ARCHER RSS BHA#10 FROM SURFACE TO 181'MD -PJSM WITH RIG CREWAND SLB DD/MWD -SURFACE TEST ARCHER TOOL AS PER SLB DO OVERALL LENGTH OF BHA:181' FT MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 08:30 - 15:30 7.00 DRILL N DFAL 12,023.00 PROD1 RUN IN HOLE WITH 6-1/8"PRODUCTION DRILLING BHA#10 FROM 181'MD TO 11,987' MD'MD -RIH ON ELEVATORS WITH 4"STANDS FROM THE DERRICK -SHALLOW HOLE TEST AT 1,500'MD:PASS -BREAK CIRCULATION EVERY 20 STANDS. 260 GPM,1500 PSI -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -PU 115K,SO 110KAT 6,602'MD -PU 179K,SO 144KAT 11,300'MD 15:30 - 17:00 1.50 DRILL N DFAL 12,023.00 PROD1 CIRCULATE AND WORK PIPE DUE TO 5-10K OVERPULLAND 150 PSI PRESSURE FLUCTUATION -260 GPM,1912 PSI -80 RPM,4-9K TORQUE 17:00 - 22:30 5.50 DRILL N DFAL 12,023.00 PROD1 RE-SURVEY FROM 11,945'MD TO 11,456'MD EVERY 30' -CONSULT WITH ODE 22:30 - 23:30 1.00 DRILL P PROD1 RUN IN HOLE WITH 6-1/8"PRODUCTION DRILLING BHA#10 FROM 11,456'MD TO 11,860'MD -PU 180K,SO 144KAT 11,860'MD -MUD WEIGHT:8.6 PPG IN,8.6 PPG OUT -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 23:30 - 00:00 0.50 DRILL P PROD1 REAM DOWN FROM 11,860'MD TO 12,023'MD -260 GPM,1900 PSI -40 RPM,5-6K TORQUE 2/16/2016 00:00 - 01 30 1.50 DRILL P PROD1 CIRCULATE AND CONDITION WELLBORE -PUMP 20 BBL HI-VIS SWEEP AT 12,023'MD WITH 20%INCREASE IN CUTTINGS RETURNS -265 GPM,1850 PSI AT 12,000'MD -OBTAIN SPRS AT 12,022'MD(9,009'TVD),8.6 PPG MW -MONITOR WELL FOR 10 MINUTES:STATIC Printed 3/28/2016 1 04 57PM `AII depths reported in Drillers Depths* "/0:,, North America-ALASKA-B� ,, s �a e45of52 Operation Summary Report Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:30 - 04:30 3.00 DRILL P PROD1 MAD PASS AS PER SLB DD/MWD AND GEOLOGIST FROM 12,023'MD TO 11,455'MD -700 FT/HR NO ROTATION -MONITOR WELL FOR 10 MINUTES AT SHOE: STATIC PUMP DRY JOB 04:30 - 08:30 4.00 DRILL N DFAL 12,023.00 PROD1 PULL OUT OF HOLE WITH 6-1/8"ARCHER RSS BHA#10 FROM 11,455'MD TO 200'MD PU 170K,SO 150K AT 11,400'MD -MUD WEIGHT:8.6+PPG IN,8.6+PPG OUT -MONITOR WELL VIA TRIP TANK PROPER DISPLACEMENT 08:30 - 10:00 1.50 DRILL N DFAL 12,023.00 PROD1 LAY DOWN ARCHERRSS BHA#10 FROM 200' MD MONITOR WELL PRIOR Tb PULLING NON-SHEARABLES THROUGH STACK STATIC -PJSM WITH CREWAND SLB DD/MWD OVERALL BHA LENGTH:181 FT -CLEAN AND CLEAR RIG FLOOR 10:00 - 10:30 0.50 DRILL P PROD1 DAILY RIG SERVICE - BE CiG OO EQLUUIPRICATMENT.MECHANICRIG.SERVINSPECTIONERIFLR OF RIG FLOOR EQUIPMENT. 10:30 - 12:00 1.50__.. DRILL N DFAL 12,023.00 PROD1 MAKE UP BHA#11,1.59 DEG MOTOR, SLIMPULSE,AND INSERT BIT FROM SURFACE -PJSM WITH CREWAND SLB DD/MWD -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 12:00 - 13:00 1.00 DRILL N DFAL 12,023.00 PROD1 REMOVE PULSER AND REPAIR DUE TO INCORRECT MEASUREMENTS ON SLIM PULSE 13:00 - 14:00 1.00 DRILL N DFAL 12,023.00 PROD1 CONTINUE MAKE UP BHA#11,1.59 DEG MOTOR,SLIMPULSE,AND INSERT BIT FROM TO 444'MD -PJSM WITH CREWAND SLB DD/MWD -BHA LENGTH:182 FT -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 14:00 - 20:30 6.50 DRILL N DFAL 12,023.00 PROD1 RUN IN HOLE WITH 6-1/8"DRILLING BHA#11 FROM 444'MD TO 11,600'MD -RIH ON ELEVATORS WITH 4"DP FROM THE DERRICK -PERFORM SHALLOW HOLE TEST AT 1,900' MD:NO FAILURES -BREAK CIRCULATION EVERY 1,800'MD.200 GPM,1050 PSI. -PU 176K,SO 144K AT 11,400'MD -MONITOR WELL VIA TRIP TANK PROPER DISPLACEMENT 20:30 - 23:00 2.50 DRILL N DFAL 12,023.00 PROD1 RE-SURVEY PER SLB DD/MWD AT 11,600'MD, 11,630'MD,AND 11,660'MD -PERFORM ROLL TESTAT 11,821'MD 23:00 - 00:00 1.00 DRILL N DFAL 12,023.00 PROD1 WASH DOWN FROM 11,881'MD TO 12,000'MD -250 GPM,1730 PSI -PU 185K,SO 141KAT 12,000'MD -OBTAIN SPRS AT 12,000'MD(9,013'TVD) MW:8.6 PPG Printed 3/28/2016 1 04 57PM *All depths reported in Drillers Depths* • 744a ic;iEca-ALASKA- Page ' _' Operation Summary Report , Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/17/2016 100:00 - 12 00 12.00 DRILL P PROD1 DRILLAHEAD IN 6-1/8"PRODUCTION HOLE WITH 1.59 DEG MOTOR,SLIMPULSE,AND INSERT BIT,BHA#11,FROM 12,023'MD TO 12,250'MD -PU 183,SO 134,ROT 154 -250 GPM,2750 PSI ON,2630 PSI OFF 40 RPM,8K TORQUE ON,6K TORQUE OFF -TOUR ROTATE TIME:2.64 HRS -TOUR SLIDE TIME:3.56 HRS TOTAL BIT TIME:6.20 HRS -SURVEY EVERY 30 FT -BACKREAM 20 FT PRIOR TO CONNECTIONS -MUD WEIGHT:8.6+PPG IN,8.6+PPG OUT 12:00 - 16:30 4.50 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE FROM 12,250'MD TO 12,323'MD(8,965'ND) -250 GPM,2750 PSI ON,2630 PSI OFF -40 RPM,8K TORQUE ON,6K TORQUE OFF -PU 185K,SO 135K,ROT 154KAT 12,323'MD -SURVEY EVERY 30 FT -TOUR ROTATE TIME:0.81 HRS -- -TOUR SLIDE TIME:0.74 HRS -TOTAL BIT TIME:7.75 HRS -MUD WEIGHT:8.6+PPG IN,8.6+PPG OUT 16:30 - 17:30 1.00 DRILL P PROD1 'CIRCULATE BOTTOMS UP -250 GPM,1700 PSI -40 RPM,5K TORQUE -OBTAIN SPRS AT 12,323'MD(8,965'ND) MW:8.6 PPG -MONITOR WELL 10 MINUTES:STATIC 17:30 - 18:00 0.50 DRILL P - _ PROD1 BACKREAM OUT OF HOLE FROM 12,323'MD TO 12,075'MD -250 GPM,1640 PSI AT 12,210'MD -40 RPM,4-5K TORQUE,154K ROT -BACKREAM 600 FT/HR 18:00 - 19:00 1.00 DRILL P PROD1 PUMP OUT OF HOLE FROM 12,075'MD TO 11,450'MD -250 GPM,1540 PSI -MUD WEIGHT:8.6+PPG IN,8.6+PPG OUT 19:00 - 20:00 1.00 DRILL P PROD1 CIRCULATE BOTTOMS UPAT7"LINER SHOE -250 GPM,1700 PSI -40 RPM,5K TORQUE -MONITOR WELL 10 MINUTES:STATIC 20:00 - 20:30 0.50 DRILL P PROD1 DAILY RIG SERVICE -GREASE ST-80,TOP DRIVE,BLOCKS, CHECK OIL IN TOP DRIVE 20:30 - 00:00 3.50 DRILL N DFAL 12,300.00 PROD1 PULL OUT OF HOLE ON ELEVATORS FROM 11,450'MD TO 1,000'MD -PU 180K,SO 144KAT 11,400'MD -MUD WEIGHT:8.6+PPG IN,8.6+PPG OUT -MONITOR WELL VIA TRIP TANK PROPER DISPLACEMENT 2/18/2016 00:00 - 00:30 0.50 DRILL N DFAL 12,323.00 PROD1 PULL OUT OF HOLE ON ELEVATORS WITH MOTOR BHA#11 FROM 1,000'MD TO 200'MD -PU 42K,SO 40K AT 200'MD -MUD WEIGHT:8.6+PPG IN,8.6+PPG OUT -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 00:30 - 01:00 0.50 DRILL P PROD1 PERFORM WEEKLY BOPE FUNCTION TEST -PASSING TEST Printed 3/28/2016 1 04 57PM *All depths reported in Drillers Depths* North America-ALASKA-B' Operation Summary Report ; Common Well Name R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor.PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual 165.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:00 - 02:30 1.50 DRILL N DFAL 12,323.00 PROD1 LAY DOWN BHA#11 PER SLB DD/MWD -PJSM WITH RIG CREWAND SLB DD/MWD -MONITOR WELL 10 MINUTES PRIOR TO PULLING BHA THROUGH STACK:STATIC CLEAN AND CLEAR RIG FLOOR 02:30 - 03:00 0.50 DRILL P PROD1 PERFORM WEEKLY DERRICK INSPECTION: PASSING 03:00 - 04:30 1.50 DRILL N DFAL 12,323.00 PROD1 MAKE UP 6-1/8"ARCHER RSS DRILLING BHA #12 TO 200'MD PJSM WITH CREWAND SLB DD/MWD -SURFACE TEST ARCHER TOOL PER SLB: PASS -BHA LENGTH:181 FT -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 04:30 - 10:30 6.00 DRILL N DFAL 12,323.00 PROD1 RUN IN CASED HOLE WITH ARCHER RSS BHA #12 FROM 200'MD TO 11,320'MD -PU 172K,SO 145K AT 11,320'MD -FILL PIPE EVERY 15 STANDS -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT 10:30 11:30 1.00 DRILL P PROD1 SLIP AND CUT 9 WRAPS,75 FT,DRILLING 1 LINE - PJSM -CALIBRATE DRAW WORKS AND AMPHION. SET SLB DEPTH TRACKER. 11:30 - 13:00 1.50 DRILL N DFAL 12,323.00 PROD1 RUN IN OPEN HOLE WITH ARCHER RSS BHA #12 FROM 11,320'MD TO 12,323'MD -PU 180K,SO 140KAT 11,850'MD -FILL PIPE EVERY 15 STANDS -MONITOR WELL VIA TRIP TANK:PROPER DISPLACEMENT -ENCOUNTER TIGHT HOLE AT 11,951'MD. -REAM THROUGH:20K WOB,ROTATE 80 RPM,250 GPM 13:00 - 15:00 2.00 DRILL P PROD1 MAD PASS FROM 12,323'MD TO 11,980'MD AND RUN IN HOLE TO 12,323'MD -SURVEY EVERY JOINT -250 GPM,1750 PSI,80 RPM -OBTAIN SPRS 12,323'(8,969'TVD)MW 8.7 PPG 15:00 - 15:30 0.50 DRILL P PROD1 DAILY RIG SERVICE -GREASE ST-80,BLOCKS,CHECK TOP DRIVE OIL LEVELS 15:30 - 00:00 8.50 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE FROM 12,323'MD TO 12,739'MD -270 GPM,2270 PSI ON,2250 PSI OFF -160 RPM,8K TORQUE ON,6K TORQUE OFF -PU 185K,SO 137K,ROT 152K -SURVEY EVERY 30 FT -MUD WEIGHT:8.7 PPG IN,8.7 PPG OUT -TOUR ROTATE TIME:5.5 HRS -TOTAL BIT TIME:5.5 HRS -CROSSED FAULT#3 AT 12,395'MD.6.5 BBL LOSS.IDENTIFIED ON LOGS. Printed 3/28/2016 1 04 57PM *All depths reported in Drillers Depths* North America-ALASKA` B Operation Summary Report Common Well Name.R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor.PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/19/2016 00:00 - 09:00 9.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE FROM 12,323'MD TO 13,057'MD -275 GPM,2240 PSI ON,22201 PSI OFF -135 RPM,8K TORQUE ON,7K TORQUE OFF -PU 185K,SO 137K,ROT 152K -SURVEY EVERY 30 FT -TOUR ROTATE TIME:7.26 HRS TOTAL BIT TIME:12.78 HRS -MUD WEIGHT:8.7 PPG IN,8.7 PPG OUT OBTAIN SPRAT 13,054'MD,9,010'TVD,MW 8.7 PPG 09:00 - 10:00 1.00 DRILL C PROD1 CIRCULATE AND CONDITION MUD -275 GPM,2245 PSI -135 RPM,6K TORQUE MONITOR WELL FOR 10 MINUTES(STATIC) 10:00 - 12:00 2.00 DRILL C PROD1 POH ON ELEVATORS F/13,057'MD T/12,450' MD -PU 180K,SO 140KAT 12,020'MD -TIGHT HOLE AT 12,450'MD WITH 20K OVERPULL -BACKREAM F/12,450'MD T/12,030'MD -265 GPM,1900 PSI -80 RPM,8K TORQUE 12:00 - 00:00 12.00 STK01-1- C PROD1 ,TIME DRILL FOR OPEN HOLE SIDETRACK AS PER SLB DD F/12,025'MD T/12,040'MD -TRENCHING OPERATIONS ABOVE SIDE TRACK POINT STOPPING AT 12,025'EACH DOWN STROKE TRENCH 25'AT 50 FPH -TRENCH 20'AT 50 FPH -TRENCH 15'AT 30 FPH -TRENCH 10'AT 30 PFH -TRENCH 5'AT 15 FPH -TIME DRILL OPERATION -DRILL F/12,025'T/12,028'AT 1 FPH -DRILL F/12,028'T/12,034'AT 2 FPH -DRILL F/12,034'T/12,040'AT 3 FPH -270 GPM,2045 PSI -135 RPM,5-6K TORQUE -MW 8.7 PPG IN,8.7 PPG OUT -TOUR ROTATE TIME 8.03 HRS. -TOTAL BIT TIME 20.79 HRS -TOTAL JAR TIME 20.79 HRS 2/20/2016 00:00 - 02:30 2.50 STKOH C PROD1 CONTINUE TIME DRILL OPERATION FOR OPEN HOLE SIDE TRACK FROM 12,040'MD TO 12,075'MD -DRILL F/12,040'T/12,042'AT 3 FPH -DRILL F/12,042'T/12,046'AT 4 FPH -DRILL F/12,046'T/12,051'AT 10 FPH -270 GPM,2045 PSI -135 RPM,5-6K TORQUE -MW 8.7 PPG IN,8.7 PPG OUT -PU 180K,SO 142K 02:30 - 03:00 0.50 STKOH C PROD1 DAILY RIG SERVICE -SERVICE TOP DRIVE,CHECK OIL,ADD HYDRAULIC OIL TO TOP DRIVE.SERVICE BLOCKS AND CROWN.SERVICE ST-80. Printed 3/28/2016 1 04 57PM *All depths reported in Drillers Depths* • ' North America-ALASKA BPk.; ,= Page 49 of 52 f.• Operation Summary Report ort ' rF, Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual l 65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 19:00 16.00 STKOH C PROD1 DRILL 6-1/8"PRODUCTION HOLE WITH ARCHER RSS BHA#12A FROM 12,075'MD TO 13,070'MD -270 GPM,2040 PSI ON,2020 PSI OFF -135 RPM,8K TORQUE ON,6K TORQUE OFF -PU 185K,SO 140K,ROT 153K -SURVEY EVERY 30-90 FT -MUD WEIGHT:8.7 PPG IN,8.8 PPG OUT -TOUR ROTATE TIME:8.13 HRS OBTAIN SPRAT 12,075'MD(9,003'TVD).MUD WEIGHT 8.8 PPG 19:00 - 00:00 5.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE WITH ARCHER RSS BHA#12A FROM 13,070'MD TO 13,402'MD 270 GPM,2125 PSI ON,2100 PSI OFF -135 RPM,10K TORQUE ON,7K TORQUE OFF -PU 192K,SO 135K,ROT 155K -SURVEY EVERY 30-90 FT MUD WEIGHT:8.7 PPG IN,8.8 PPG OUT -TOUR ROTATE TIME:8.17 HRS -TOTAL BIT TIME 37.09 HRS -TOTAL JAR TIME 37.09 HRS OBTAIN SPRAT 13,019'MD(8,988'TVD).MUD WEIGHT 8.7 PPG 2/21/2016 00:00 - 12:00 12.00 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE FROM 13,402'MD TO 14,253'MD.(8,999'TVD) -270 GPM,2165 PSI ON,2150 PSI OFF -135 RPM,13K TORQUE ON,10K TORQUE OFF -PU 196K,SO 130K,ROT 154K -SURVEY EVERY 30-90 FT -MUD WEIGHT:8.7 PPG IN,8.8 PPG OUT -ACTUAL ROTATE TIME 8.31 HRS -OBTAIN SPR AT 14,060'MD,9,000'TVD,MW 8.7 PPG 12:00 - 23:30 11.50 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE FROM 13,402'MD TO 15,105'MD.(8,996'TVD) -270 GPM,2250 PSI ON,2240 PSI OFF -135 RPM,15K TORQUE ON,13K TORQUE OFF -PU 204K,SO 129K,ROT 154K -SURVEY EVERY 30-90 FT -MUD WEIGHT:8.7 PPG IN,8.8 PPG OUT -ACTUAL ROTATE TIME 8.51 HRS -TOTAL BIT TIME 53.91 HRS. -TOTAL JAR TIME 53.91 HRS -OBTAIN SPR AT 15,000'MD,8,996'TVD,MW 8.7 23:30 - 00:00 0.50 DRILL P PROD1 RIG SERVICE GREASE AND INSPECT -TOP DRIVE,ST-80,GREASE WASH PIPE Printed 3/28/2016 1 04 57PM *All depths reported in Drillers Depths* • NcA7G;ca-ALASKA-BP�� 1 Operation Summary Report /4;,,. /0-4.;/.7 Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253 00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date I From-To Hrs Task I Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/22/2016 00:00 - 10:30 10.50 DRILL P PROD1 DRILL 6-1/8"PRODUCTION HOLE FROM 15,105'MD TO 15,858'MD. -270 GPM,2370 PSI ON,2350 PSI OFF. -135 RPM,16K TORQUE ON,14K TORQUE OFF. -PU 210K,SO 120K,ROT 152K. -SURVEY EVERY 30-90 FT. -ACTUAL ROTATE TIME 8.51 HRS. -TOTAL BIT HRS 62.42. TOTAL JAR HRS 62.42. -BACK REAM 15'PRIOR TO CONNECTIONS. MW 8.7PPG IN, 8.7PPG OUT. -OBTAIN SPRAT 15,858'MD,9,030 TVD. — 10:30 - 12:00 1.50 DRILL P PROD1 CIRCULATE AND CONDITION MUD AT TD. '-270 GPM,2315 PSI. -135 RPM,13K TORQUE. -SIMOPS LAY DOWN EXTRA 4"STANDS OF DRILL RIPE FROM DERRICK. 12:00 - 14:30 2.50 DRILL P PROD1 CBU 3X WHILE BACK REAMING STDS F/ 15,858'T/15,389.' 265 GPM,2315 PSI. -140 RPM,10K TORQUE. ROTATE WT 149K. PUMP SWEEP 100%INCREASE 14:30 - 16:30 2.00 DRILL P PROD1 MONITOR WELL FOR 10 MINUTES(STATIC). -MUD WEIGHT 8.7PPG IN,8.7PPG OUT. -POH ON ELEVATORS F/15,389'T/12,071'. -PU 198K,SO 134K,AT 15,389'. 16:30 - 17:30 1.00 DRILL P PROD1 ORIENTATE TOOL HIGH SIDE,WORK SIDE TRACK JUNCTION -PULL THROUGH SIDE TRACK JUNCTION -SHUT DOWN PUMP,LOWER THROUGH JUNCTION. -SURVEY TO VERIFY INCL IN SIDE TRACK 17:30 - 18:30 1.00 DRILL P PROD1 POH ON ELEVATORS F/12,071'T/11,400". -PU 176K,SO 129K,AT 11,400'. -MONITOR WELL AT 7"SHOE(STATIC) 18:30 - 19:00 0.50 DRILL P PROD1 CIRCULATE AND CONDITION MUD AT 11,400'. -265 GPM,1975 PSI. -135 RPM,ROT WT 149K. 19:00 - 19:30 0.50 DRILL P PROD1 POH ON ELEVATORS F/11,400'T/10,283'. -TO ACHIEVE CORRECT WEIGHT TO SET RTTS FOR BOPE TEST -PU 163K,SO 137K,AT 10,283' 19:30 - 21:00 1.50 DRILL P PROD1 PJSM MU RTTS AND RHOT -SET RTTS AT 94'AS PER HES PROCEDURE 21:00 - 22:30 1.50 DRILL P PROD1 PJSM MAKE UP 4.5 TEST JOINT -REMOVE WEAR RING. -SET TEST PLUG -RUN IN LOCK DOWNS AS PER CAMERON REP 22:30 - 23:00 0.50 DRILL P PROD1 RIG SERVICE 23:00 - 00:00 1.00 DRILL P PROD1 PJSM TEST BOPE -TEST BOPE COMPONENTS 250 PSI LOW, 3500 PSI HIGH Printed 3/28/2016 1.04.57PM *AII depths reported in Drillers Depths* • • :::;:::: 51 of s2 rt �„� Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Tme:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor.PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs ' Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/23/2016 00:00 - 03:00 3.00 DRILL P PROD1 TEST BOPE 250 PSI LOW,3500 PSI HIGH. -TEST WITH 4.5 AND 2 7/8”TEST JOINTS. -ALL TESTS CHARTED. -NO FAILURES. -TEST WITNESS WAIVED BYAOGCC REP JEFF JONES. 03:00 - 03:30 0.50 DRILL P PROD1 BLOW DOWN AND RIG DOWN TEST EQUIPMENT. BLOW DOWN CHOKE MANIFOLD. LINE UP WELL CONTROL EQUIPMENT. -BOLDS ON TEST PLUG AS PER CAMERON REP. -PULL TEST PLUG. -INSTALL WEAR RING. RUN IN AND TORQUE 4 LOCK DOWN ON WEAR RING. 03:30 - 05:00 1.50 DRILL P PROD1 PJSM PULL RTTS. -PICK UP STINGER. -RU-I WITH STINGER. -CIRCULATE AT 5 BPM TO CLEAR OFF TOP OF RTTS. MAKE UP RETRIEVING TOOL TO RTTS. RELEASE RTTS AND PULL TO SURFACE. PU 165K,SO 140K. -LAY DOWN RTTS AS PER HES REP. 05:00 - 05:30 0.50 DRILL P PROD1 RIH ON ELEVATORS F/10,283'T/11,450'. -RIH WITH 4"DRILL PIPE TO 7"SHOE. 05:30 - 07:00 1.50 DRILL P PROD1 CIRCULATE STEEL LUBE PILL S/S VOLUME DUMP AT SURFACE. -270 GPM,1950 PSI. -60 RPM 5K TORQUE INITIAL 4K TORQUE AFTER PILL AROUND. -INITIAL PU 175K,SO 140K. -FINIAL PU 175K,SO 140K. -MONITOR WELL FOR 10 MINUTES(STATIC). 07:00 - 09:30 2.50 DRILL P PROD1 RIH ON ELEVATORS W/4"DP F/11,450'T/ 15,858'. -RIH AT 100 FPM. -CIRCULATE EVERY 20 STANDS 240 GPM, 1900 PSI. 09:30 - 13:00 3.50 DRILL P PROD1 CIRCULATE BOTTOMS UP 3 TIMES. -270 GPM,2300 PSI. -165 RPM,7K TORQUE -PUMP NUT PLUG LCM SWEEP S/S. -ADD LUBRICANTS TO MUD AS PER MUD ENGINEER. -MONITOR WELL FOR 10 MINUTES(STATIC LOSSES)3 TO 5 BPH. -MW 8.7 IN,8.7 OUT. 13:00 - 15:30 2.50 DRILL P PROD1 POH ON ELEVATORS F/15,858'T/11,410'. -PU 198K,SO 132KAT 15,858'. -MONITOR DISPLACEMENT VIA TRIP TANK. 15:30 - 16:00 0.50 DRILL P PROD1 MONITOR WELL AT THE 7"SHOE AT 11,410'. -FLUID LEVEL DROPPING 3 TO 5 BPH LOSSES. -PUMP 15 BBL DRY JOB 10 PPG,AT 171 GPM, 1012 PSI. -DROP 2 3/8"RABBIT. Printed 3/28/2016 1:04:57PM *All depths reported in Drillers Depths* North America 'aaA§- - kA-BP f Operation Summary Report Common Well Name:R-16 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date: 1/14/2016 End Date:2/23/2016 X3-017HY-C:(8,196,253.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:00 - 20:30 4.50 DRILL P PROD1 POH ON ELEVATORS F/11,410'T/181'. -PU 170K,SO 146KAT 11,410'. -AT 5,279'LAID DOWN HWDP AND JARS. -MONITOR WELL VIA TRIP TANK. -MONITOR WELL FOR 10 MINUTES BEFORE PULLING NON SHEARABLES INTO BOP. 20:30 - 22:30 2.00 DRILL P PROD1 PJSM LAYING DOWN BHA#12. LAY DOWN BHA#12 AS PER SLB REPS. REMOVE SOURCE. -REMOVE CORRISION RING. -CEAR AND CLEAN FLOOR OF BHA COMPONENTS. Printed 3/28/2016 1 04 57PM `AII depths reported in Drillers Depths* • • North America ALASKA BP P,9e 1 of Operation Summary Report Common Well Name:R-16 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/23/2016 End Date:2/28/2016 X3-017HY-C:(3,463,747.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual©65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/23/2016 22:30 - 23:00 0.50 CASING P RUNPRD SERVICE RIG. 23:00 - 00:00 1.00 CASING P RUNPRD PJSM WITH DOYON PERSONNEL. -RIG UP HANDLING EQUIPMENT TO RUN 4-1/2"LINER. 2/24/2016 00:00 - 01:00 1.00 CASING P RUNPRD PJSM WITH DOYON CASING PERSONNEL. -COMPLETE RIG UP TO RUN 4 1/2" PRODUCTION LINER. -WSL,TP,DRILLER AND CASING HANDS COUNTED PIPE IN PIPESHED. -REVIEWED TALLY RUNNING ORDER. 01:00 - 06:00 5.00 CASING P ' RUNPRD RIH WITH 4 1/2"LINER. -RUN SHOE TRACK BAKER LOCKING CONNECTIONS. -CHECK FLOATS,FLOATS WORKING CORRECTLY. -USE JET LUBE SEAL GUARD PIPE DOPE. -TORQUE CONNECTIONS TO 4,700 FT LBS. -FILL CASING EVERY JOINT TOP OFF EVERY 10 FOR CORRECT DISPLACEMENT. -PU 83K,SO 81K CONFIRM NUMBER OF JOINTS LEFT IN PIPE SHED(CORRECT) 06:00 - 06:30 0.50 CASING R RUNPRD P/U AND M/U VERSA FLEX LNR HANGER AND PACKER ASSEMBLY AS PER HES REP -PJSM(VIDEO PROVIDED BY HES T/SHOW TOOL SET-UP AND FUNCTIONALITY) 06:30 - 07:30 1.00 CASING P RUNPRD CIRCULATE 1.5X LNR VOLUMES AT 4 BPM, 380PSI -PU 84K,SO 83K 07:30 - 11:30 4.00 CASING P RUNPRD CONTINUE T/RIH W/4-1/2"LNR UTILIZING 4" DP STANDS OUT OF THE DERRICK F/4600'MD T/11420'MD(7"SHOE) RIH AT 90FT/MIN -PU 160K,SO 130K -FILL PIPE EVERY 10 STANDS,WASHING DOWN EVERY 10TH STAND AT 3BPM,500PSI. 11:30 - 12:00 0.50 CASING P RUNPRD CONDITION MUDAT7"WINDOW BY CIRCULATING B/U -STAGE PUMPS UP T/5BBUMIN IN INCREMENTS -2BBUMIN,490PSI -3BBUMIN,600PSI -4BBUMIN,700PSI -5 BBL/MIN,845PSI LOSSES T/FORMATION AT NOON,21 BBLS 8.7PPG MW IN,8.8PPG MW OUT 12:00 - 17:00 5.00 CASING P RUNPRD RIH W/4-1/2"LNR ON 4"DP OUT OF THE DERRICK F/11240'MD T/15858'MD TAGGING TD -PU 165K,SO 136KAT 11420'MD -RIH AT 6OFT/MIN -FILL PIPE EVERY 10 STANDS,WASHING DOWN 10TH STAND AT 2BBUMIN 17:00 - 17:30 0.50 CASING P RUNPRD SERVICE RIG 17:30 - 18:00 0.50 CASING N RREP RUNPRD DRAVVVVORKS ENCODER ISSUE Printed 3/28/2016 1 05 35PM `AII depths reported in Drillers Depths* • North America-ALASKA-BP Page 2 of Operation Summary Report Common Well Name:R-16 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/23/2016 End Date:2/28/2016 X3-017HY-C:(3,463,747.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor.PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual©65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 21:30 3.50 CASING P RUNPRD P/U CEMENT HEAD,INSTALL CONTINGENCY LNR RELEASE BALL IN CEMENT HEAD, STAGE UP PUMPS T/CONDITION HOLE -2BPM,734PS1 3BPM,871PS1 4BPM,1008PSI -5BPM,1300PSI CONTINUE CIRCULATING FOR BU 21:30 - 00:00 2.50 CASING N SFAL RUNPRD ,ATTEMPT T/PRESSURE TEST CEMENT LINES,CEMENT HEAD LEAKING -L/D CEMENT HEAD T/PIPE SHED P/U SINGLE JOINT OF DP AND CIRCULATE -STAGE PUMPS UP T/5BPM @ 1260PSI LOSSES T/FORMATIONAL MIDNIGHT,41BBLS 8.7PPG MW IN,8.8PPG MW OUT 2/25/2016 00:00 - 02:00 2.00 CASING N SFAI. RUNPRD ,CONTINUE T/CIRCULATE W/4.5"LNR ON BOTTOM AT 5,0-BPM AT 1,260-PSI -WAITING FOR REPLACEMENT CEMENT HEAD 02:00 - 03:00 1.00 CASING N SEAL RUNPRD L/D SINGLE JOINT,P/U HES REPLACEMENT CEMENT HEAD -HOOK UP 10K PSI HOSES T/CEMENT HEAD --INSTALL CONTINGENCY LNR SETTING BALL INTO CEMENT HEAD(VERIFY OD AT 1-7/8") -STAGE PUMPS UP TO 5.0-BPM THROUGH CEMENT HEAD -2.0-BPM AT 760-PSI -3.0-BPM AT 920-PSI -4.0-BPM AT 1,135-PSI -5.0-BPM AT 1,260-PSI -LOSSES=10-BBLS.WHILE CIRCULATING Printed 3/28/2016 1 05 35P *AII depths reported in Drillers Depths* • North America-ALASKA-BP l'UOperation Summary Repo 0 Common Well Name:R-16 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/23/2016 End Date:2/28/2016 X3-017HY-C:(3,463,747.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 06:30 3.50 CEMT P RUNPRD CEMENT 4-1/2"PRODUCTION LINER PER SCHLUMBERGER CEMCADE AS FOLLOWS: -FILL SURFACE LINES WITH FRESH WATER AND LEAK-TIGHT PRESSURE TEST TO 331-PSI AND 6,500-PSI FOR 5.0-MINUTES EACH TEST. VISUALLY CONFIRMED NO LEAKS. PUMPED 35.0-BBLS.OF 11.0-PPG MUDPUSH II SPACER @ 5.0-BPM©1263-PSI PUMPED 116.35-BBLS OF 15.8-PPG CLASS G TAIL CEMENT WITH GAS-BLOK @ 5.0-BPM, EXCESS VOLUME 40%(YIELD 1.17 CU. FT./SK.) CEMENT WETAT 04:05-HRS. FLUSH CMT F/LINES T/BLEEDER W/8.6PPG PERF PILL -DROP DRILL PIPE WIPER DART -UNABLE TO RECIPROCATE PIPE- DRAWWORKS RUNNING ON ONE MOTOR -PERFORM DISPLACEMENT WITH SCHLUMBERGER PUMP -DISPLACED CEMENT WITH 85-BBLS.OF 8.6-PPG PERF PILLAND 105-BBLS.OF 8.6-PPG POWERPRO MUD -SLOWED RATE TO 2.0-BPM AT 20-BBLS. PRIOR TO WIPER DART LATCHUP. CONFIRMED DRILL PIPE WIPER DART LATCH UP AT 114-BBLS.DISPLACED -INCREASE DISPLACEMENT RATE TO 5.0-BPM UNTIL 173.5-BBLS.DISPLACED -SLOWED DISPLAEMENT RATE TO 3.0-BPM AT 10-BBLS.BEFORE PLUG BUMP -BUMPED PLUG AT 185-BBLS.DISPLACED -BLED OFF PRESSURE AND CHECKED FLOATS -FLOATS HELD -CEMENT IN PLACE AT 05:45-HRS. -CEMENT REACHED 1000-PSI COMPRESSIVE STRENGTH AT 00:00-HRS.TONIGHT TOTAL LOSSES DURING CEMENT JOB= 22.0-BBLS: -18.0-BBLS.BEFORE CEMENT TURNED CORNER -4.0-BBLS.AFTER CEMENT TURNED CORNER ESTIMATED 28.0-BBLS.CEMENT RETURNED TO SURFACE 06:30 - 07:00 0.50 CASING P RUNPRD SET 7"X 4-1/2"LINER HANGER -PICKED UP STRING TO 40K LBS.OVER STRING WEIGHT -PRESSURE UP STRING TO 4,490-PSI TO SET LINER HANGER AS PER HALLIBURTON REPRESENTATIVE -SET LINER HANGER PER HALLIBURTON PROCEDURE -BLEED OFF PRESSURE TO 0-PSI -RIG DOWN CIRCULATING LINES AND EQUIPMENT Printed 3/28/2016 1 05 35PM *AII depths reported in Drillers Depths* North America-AtASffA'- ' ...�� Operation Summary Report Common Well Name R-16 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/23/2016 End Date:2/28/2016 X3-017HY-C:(3,463,747 00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor.PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:00 - 07:30 0.50 CASING P RUNPRD PICKUP STRING WHILE CIRCULATING AT 1.0-BPM AND OBSERVE PRESSURE DECREASE AS LINER RUNNING TOOL EXITS TOP OF LINER TIE-BACK RECEPTACLE -MARK PIPE WITH NO-GO MARK -CIRCULATE BOTTOMS UP TO DISPLACE ECESS CEMENT FROM WELL OBSERVED 28.0-BBLS.CEMENT RETURNED TO SURFACE PUMP RATE 10.0-BPM @ 2,160-PSI 07:30 - 09:00 1.50 CASING P RUNPRD DISPLACE WELL FROM 8.6-PPG POWERPRO TO 8.5-PPG SEAWATER -PUMP 10.0-BPM AT 2,040-PSI -SHUT DOWN,PUMPS FLOW CHECK WELL FOR 10-MINUTES= STATIC 09:00 - 09:30 0.50 CASING P RUNPRD BREAK OUT AND LAY DOWN CEMENTING HEAD TO PIPESHED CLEAN TROUGHS,SHAKER BEDS AND TRIP TANKS 09:30 - 12:00 2.50 CASING P RUNPRD POOH ON ELEVATORS FROM 11,290'MD TO 4,100'MD PUW=175K,SOW=145K @ 11,290'MD; P U W =95K,SOW=90K@4,100';MD 12:00 - 13:30 1.50 CASING P RUNPRD CREW CHANGE,POOH ON ELEVATORS F/ 4100'MD T/LNR RUNNING TOOL -PJSM-PULLING OUT OF CASED HOLE 8.5PPG MW IN AND OUT 22BBL LOSSES FOR TOUR 13:30 - 14:00 0.50 CASING P RUNPRD B/OAND UD HES LNR RUNNING TOOL AS PER HES REP 14:00 - 14:30 0.50 PERF P-- OTHCMP LUBRICATE RIG FLOOR EQUIPMENT 14:30 - 16:00 1.50 PERF P OTHCMP PREP RIG FLOOR T/RIH W/SLB TCP GUNS ON 2-7/8"PAC PIPE -BRING DOYON CSG EQUIPMENT T/FLOOR, INSPECTAND VERIFY ALL TUBULAR HANDLING EQUIPMENT 16:00 - 18:30 2.50 PERF P OTHCMP P/U PERF GUNS F/PIPE SHED AND RIH AS PER SLB TCP GUN REP -D1 WELL CONTROL DRILL,KICK WHILE TRIPPING W/AAR -RIH W/TCP GUNS F/SURFACE T/957'MD, P/U AND M/U FIRING HEAD 18:30 - 00:00 5.50 PERF P OTHCMP RIH W/TCP GUNS ON 2-7/8"PAC PIPE F/ 957'MD T/4247'MD -TQ ALL PAC CONNECTIONS T/3050 FT-LBS -PU 74KLBS,SO 73KLBS -UNLOCK WELLS F-37 AND R-23 8.5PPG MW IN AND OUT 0 LOSSES FOR TOUR 2/26/2016 00:00 - 00:30 0.50 PERF P OTHCMP CONTINUE T/RIH W/TCP GUNS ON 2-7/8" PAC PIPE F/4247'MD T/4564'MD -PU 78KLBS,SO 78KLBS -MONITOR DISPLACEMENT VIA TRIP TANK (PROPER FLUID RETURNS) 00:30 - 01:00 0.50 PERF P OTHCMP R/D DOYON CSG EQUIPMENT AND REMOVE 2-7/8"HANDLING EQUIPMENT F/FLOOR Printed 3/28/2016 1:05.35PM *All depths reported in Drillers Depths* North America-ALASKA-6". Operation Summary Report Common Well Name R-16 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/23/2016 End Date:2/28/2016 X3-017HY-C:(3,463,747.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release 2/28/2016 Rig Contractor.PARKER DRILLING CO. UW:500292068600 Active datum:R-16A actual©65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:00 - 07:00 6.00 PERF P OTHCMP CONTINUE T/RIH ON 4"DP STANDS F/ DERRICK F/4564'MD TO 15,763'MD -PUW=185K„SOW=130K -MONITORED DISPLACEMENT VIA TRIP TANK. 07:00 - 07:30 0.50 PERF P OTHCMP MADE UP TOP DRIVE TO STUMP -TAGGED LANDING COLLAR AT 15,763'MD -POH ON ELEVATORS FROM 15,763'MD TO PLACE BOTTOM SHOTAT 15,501'MD 07:30 - 09:00 1.50 PERF P OTHCMP :RIG UP TEST EQUIPMENT TO PRESSURE TEST 4-1/2"LINER AND LAP -PRESSURE TESTED LINER TO 250-PSI LO/ 3,500-PSI HI FOR 5/30 CHARTED MINUTES. GOOD TEST -PUMPED 6.0-BBLS.TO ATTAIN 3,500-PSI TEST PRESSURE -BLED BACK 6.0-BBLS.TO TRIP TANK `RECEIVE WTLAPPROVAL PRIOR TO PROCEEDING 09:00 - 10:00 1.00 PERF P OTHCMP PJSM WITHCREWAND SCHLUMBERGER TO PERFORATE LINER -PERFORATE LINER PER SCHLUMBERGER SPECIFIC PUMPING PROCEDURE -CONFIRM GUN DETONATION ON RIG FLOOR -INITIAL LOSSES=3.0-BBLS. 10:00 - 11:00 1.00 PERF P OTHCMP POOH ON ELEVATORS RACKING BACK 4" DRILLPIPE FROM 15,501'MD TO 14,200'MD -PUW=178K,SOW=135K -MONITOR DISPLACEMENT VIA TRIP TANK -MONITOR WELL 10-MINUTES-WELL ON SEEPAGE LOSSES 11:00 - 12:00 1.00 PERF P OTHCMP CONTINUE POOH LD DP TO PIPESHED FROM 14,200'MD TO 13,350'MD 8.5PPG SEAWATER IN AND OUT 12:00 - 13:00 1.00 PERF P OTHCMP POOH LAYING DOWN 4"DP SINGLES T/PIPE SHED F/13350'MD T/12466'MD -PU 162KLBS,SO 135KLBS -MONITOR DISPLACEMENT VIA TRIP TANK (PROPER HOLE FILL) 13:00 - 14:30 1.50 PERF P OTHCMP SLIP AND CUT 70'/8 WRAPS OF DRILL LINE -PERFORM DERRICK INSPECTION -RECALIBRATE THE ZMS AND PERFORM BRAKE TEST -FUNCTION TEST THE CROWN SAVER,AND HIGH AND LOW LIMITS ON AMPHION -MONITOR WELL VIA TRIP TANK(STATIC) 14:30 - 15:00 0.50 PERF P OTHCMP LUBRICATE RIG FLOOR EQUIPMENT 15:00 - 22:30 7.50 PERF P OTHCMP CONTINUE T/POOH LAYING DOWN 4"DP SINGLES TO THE PIPE SHED F/12466'MD T/ 4564'MD -PU 75KLBS,SO 73KLBS -MONITOR DISPLACEMENT VIA TRIP TANK 22:30 - 23:00 0.50 PERF P OTHCMP R/U 2-7/8"HANDLING EQUIPMENT T/UD PAC PIPE -R/U SAFETY VALVE W/PREPPING RIG FLOOR -BRING ELEVATORS,BAIL EXTENSIONS,AND CSG TONGS T/RIG FLOOR -MONITOR WELL VIA TRIP TANK Printed 3/28/2016 1 05 35PM *AII depths reported in Drillers Depths* :::::::: : ePage of a fi j Common Well Name:R-16 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/23/2016 End Date:2/28/2016 X3-017HY-C:(3,463,747.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor.PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task l Code NPT NPT Depth Phase Description of Operations — (hr) (usft) 23:00 - 00:00 1.00 PERF P OTHCMP UD 2-7/8"PAC PIPE SINGLE T/PIPE SHED F/ 4564'MD T/4030'MD -PU 72KLBS,SO 72KLBS -MONITOR DISPLACEMENT VIA TRIP TANK (PROPER HOLE FILL) 8.5PPG MW IN AND OUT 11 BBL LOSSES T/FORMATION SINCE FIRING PERFS 2/27/2016 00:00 - 03:30 3.50 PERF P OTHCMP CONTINUE T/POOH W/SLB TCP GUNS ON 2-7/8"PAC PIPE F/4030'MD T/989'MD MONITOR DISPLACEMENT VIA TRIP TANK (3BBL/HR LOSSES) 03:30 - 06:30 3.00 PERF P OTHCMP L/D SLB TCP PERF GUNS AS PER SLB REP F/ 989'MD T/SURFACE -CLEAN AND CLEAR RIG FLOOR MONITOR WELLBORE VIA TRIP TANK(STATIC/ NO LOSSES) 06:30 - 09:00 2.50 PERF P OTHCMP R/D AND SEND OUT SLB TCP GUNS,TOOLS, AND EQUIPMENT,R/U T/RUN COMPLETION -WSL,TP,DRILLER,AND HES REP VERIFY PIPE COUNT AND TALLY CAMERON REPS ON LOCATION,BOLDS AND PULL 6-7/8"WEAR RING -FLUSH WELLHEAD AND BOP STACK, FUNCTION LDS AS PER CAMERON 09:00 - 12:00 3.00 RUNCOM P RUNCMP R/U AND RIH W/4.5",12.6#,13-CR85 VAMTOP COMPLETION F/SURFACE T/1921'MD -UTILIZE JLSG PIPE DOPE ON ALL CONNECTIONS ABOVE THE PROD PKR -BAKER LOKALL CONNECTION BELOW PROD PKR -TQ ALL VAMTOP THREADS T/4400FT-LBS -PU 60K,SO 60K -MONITOR DISPLACEMENT VIA TRIP TANK (PROPER DISPLACEMENT) 8.5PPG MW IN AND OUT 11 LOSSES FOR TOUR 12:00 - 23:30 11.50 RUNCOM P RUNCMP CONTINUE T/RIH W/4.5",12.6#,13-CR85 VAMTOP COMPLETION F/1921'MD T/NO-GO AT 11310'MD -UTILIZE JLSG PIPE DOPE ON ALL CONNECTIONS ABOVE THE PROD PKR -TQ ALL VAMTOP THREADS T/4400FT-LBS -NO-GO ON BOTTOM OF TBR INSIDE LNR HANGER,P/U T/BREAK OVER WEIGHT THEN P/U 12'MD T/PUT WLEG 8'INTO TBR -VERIFY SPACEOUT,UTILIZE 262JNTS,9.82' PUP AND 2.21'PUP KICK WHILE TRIPPING(D1)DRILL @ 18:10, CREW RESPONSE TIME 3:30MIN 23:30 - 00:00 0.50 RUNCOM P RUNCMP LUBRICATE RIG FLOOR EQUIPMENT AND INSPECT RIGGING 8.5PPG MW IN AND OUT 0 LOSSES FOR TOUR Printed 3/28/2016 1 05 35PM *AII depths reported in Drillers Depths* • North America-ALASKA BP �7'fg Page 7 of 8 i { Operation Summary Report Common Well Name.R-16 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/23/2016 End Date:2/28/2016 X3-017HY-C:(3,463,747.00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Daterme:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor.PARKER DRILLING CO. UWI:500292068600 Active datum:R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/28/2016 00:00 - 01:00 1.00 RUNCOM P RUNCMP M/U TBG HANGER AND LAND IN TBG SPOOL, CAMERON REP RILDS,UD LANDING JNT -SIMOPS:R/D DOYON CSG EQUIPMENT 01:00 - 01:30 0.50 RUNCOM P RUNCMP R/U T/DISPLACE THE WELL W/COMPLETION FLUID,CONTINUE T/R/D DOYON CSG EQUIPMENT 01:30 - 03:00 1.50 RUNCOM P RUNCMP DISPLACE WELL W/CLEAN SW AND SPOT CORROSION INHIBITOR AS PER WELL PLAN -PUMP 174BBLS OF CLEAN SW,THEN 135BBLS OF INHIBITED SW,THEN 73BBLS OF CLEAN SW -SHUT DOWN PUMPS AND CIRCULATE 5BBLS DOWN THE TBG T/CLEAN OFF RHC SEAT SIMOPS:UD 4"DP STANDS OFFLINE T/PIPE SHED 03:00 - 05:30 2.50 RUNCOM P RUNCMP P/U AND MIU LANDING JNT,DROP B/R,SET PROD PKR AS PER HES REP,TEST TBG AND IA AS PER WELL PLAN -TEST TBG T/250PSI LOW F/5MINS,3500PSI HIGH F/30 CHARTED MINS -BLEED TBG PRESSURE T/2000PSI AND TEST IA T/250PSI LOW F/5MINS,3500PSI _HIGH F/30 CHARTED MINS -CALL WOS F/APPROVAL OF TBG AND IA TESTS(APPROVED) -BLEED OFF TBG PRESSURE T/SHEAR DCK VALVE,CIRCULATE BOTH WAYS T/ENSURE GOOD SHEAR SIMOPS:CONTINUE T/UD 4"DP STANDS OFFLINE T/PIPE SHED 05:30 - 08:00 2.50 WHSUR P RUNCMP R/U AND PUMP 73BBLS OF 90DEG DIESEL DOWN IA TAKING RETURNS UP THE STACK PUMP AT 2BPM -SHUT IN AND LINE UP T/U-TUBE F/1HR -AFTER 1 HR OPEN WELLAND MONITOR Fl 10MINS(STATIC) SIMOPS:CONTINUE T/UD 4"DP STANDS OFFLINE T/PIPE SHED 08:00 - 10:00 2.00 WHSUR P RUNCMP DRAIN STACK,R/U T-BAR AND DRY ROD TWC INTO TBG HANGER AS PER CAMERON REP -FILL STACK,TEST TWC FROM ABOVE AND BELOW F/250PSI LOW,3500PSI HIGH F/5 CHARTED MINS EACH.(GOOD TEST) SIMOPS:CONTINUE T/LID 4"DP STANDS OFFLINE T/PIPE SHED 10:00 - 11:00 1.00 RIGD P RUNCMP DRAIN STACK AND BLOW DOWN ALL SURFACE LINES/EQUIPMENT 11:00 - 12:00 1.00 RIGD P RUNCMP N/D BOPE -BLEED AIR FROM AIR BOOTS AND PULL LOW PRESSURE RISER -REMOVE TURNBUCKLES AND BREAK BOLTS ON BOP STACK -RACK BACK BOP STACK ON TEST STUMP AND SECURE NO LOSSES F/TOUR Printed 3/28/2016 1 05 35PM *AII depths reported in Drillers Depths* • North America-ALASKA-BP Operation Summary Report Common Well Name:R-16 AFE No Event Type:COM-ONSHORE(CON) Start Date:2/23/2016 End Date:2/28/2016 X3-017HY-C:(3,463,747 00) Project:Prudhoe Bay Site:PB R Pad Rig Name/No.:PARKER 273 Spud Date/Time:1/8/1982 12:00:00AM Rig Release:2/28/2016 Rig Contractor:PARKER DRILLING CO. UWI:500292068600 Active datum R-16A actual @65.85usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 14:30 2.50 RIGD P RUNCMP 'DRAIN AND N/D RISERS,B/O AND UD SAFETY JNT,R/D TEES AND CHICKSAN FROM ANNULUS 14:30 - 19:00 4.50 RIGD P RUNCMP N/U ADAPTER AND TREE AND TEST TEST ADAPTER T/250PSI LOW F/5MINS 4500PSI HIGH F/30 CHARTED MINS -LEAK TIGHT TEST TREE AT 250PSI LOW F/ 5MINS,4500PSI HIGH F/5 CHARTED MINS 19:00 - 00:00 5.00 RIGD P RUNCMP LOAD 10-3/4"CSG INTO PIPE SHED,R/D MUD AND CEMENT LINES,UD 4"XT-39 DP FROM PIPE SHED T/PIPE TUBS OUTSIDE,REPLACE SHAKER MOTORS ON SHAKER#2, DISCONNECT DRAINS.UNDER RIG FLOOR RIG RELEASED @ 23:59 02/28/16 Printed 3/28/2016 1 05:35PM "All depths reported in Drillers Depths* • 110 0 m LI NN Nam.-a MNON.ro � mNN "" mmm0000000000Ooo 0OONOO o 0000 00002 NO TTOmTO0OOODOOOOaamm maam mm m m m m m m m m m mva aaaaa aaa aaaaa aaaaa aan^ n AoaNNm mOmNm Nr^m nORN a NOm8chM° O OOmmOm. . M4m m20 ( OOMO m aamaamNN22222 22222 ' �p66aa66aaa aaAyA AA� 000000000 0000 00 nrr rrrnn A N C GO 0 0 m M 22222 m MNn N O m rrNa N�m N Qm m,ia OO O o zO MM . eaamN0 mNNNM VmoM nNm . c6 maaa?? OMNoo .-mQ am0OnmN00v N7,M WMMMMM MMMMM MMm iO,O�O(O MMMMM MN�(aD22 2 22 i[a1NNUa1 NN M 0 M 22222 M M 22 00000 0.000 OOOOO 0.00.- ..... OOOOO 00000 00 m-o o o a r 0-,,m a --.m. .00..0 O O N m MO c m a a a M M M O N M m M M m 0 O(MV O m, N a O m O O m a.-N r m a M C ;;;; ^700oi MMnnM .mmm m0(p ac^ ra� -vo ^rnrnN(o . ..1' xeaaaa aaaaM MMMMa auD(Oar mmm 2 m mmm m 0.... mmmm N N... .....mmm N N a . ...22 m N mmmmm mmmmm mmmmm . mmmrrmmmm mm N0[ .. ..... 0 ... Y... mYmmm YMMNN Nam 0 0 mO m Om N 00 0 O r 282,12 r 0thN m'amO z,-,g24 o M o n N N a 0 ,722g2 ,7mONM 01 m O O Z 0 0 0 0 66666 OOOOO (66c, ONO ( . O 3 W S o 0 o 9N O M N O M 22822 NN ion M m r Nn m aM ,7,22.7.4 AV 0069077779 0.-NNN "0 m NMaNO 2O201 r---‘7,2F,2 Om m 61 ;:::::: Om OmY, N7OmN aNO 2 - N 2 Om m m N N 4 r m N a m NN Omm N .Oma mNa O O a N (O N m O a 9999 ,rv'T. �iu..9 rovNNN MMMea 771222 rm m m m mmoo M M mz` m I m0 ^nman NNNNma'D r ^ m(^o M NrN MaO N600 Mmm MOOW W 0 r O ONO. a�on2a E atm Nevi (or .00momm0M m ° D E° .Z,of.0.8 Nn rg2om= E oo gmaDo o oa(� moo v 0,O LL'o 0666 Q U 240;O.-,- O N aD IL m F o.-5 . a Z O O O O O N o M N M a 8,':",248 N a a O m O M Q .t.-4222 n N N m m NO N N 42:1'22 m m Q 00000 NN a 01 m 8 M (O010rN1 ONvN ( 0O th a O .. £ a m 0 0 ▪ m a o = ! o did m e QEo,ad 2 �`=me M0 U O G mm' m C g LLQ& C Ic N O,2 W SOOONO 'V.NOO MNhO '7',.'4.S.8.� 12t76r+DNN ;g! 7".g..13“NYOa N..12 W uuyc Z'9c'60om1E Cl) 000077779 0'-NN NNa72 NmaNm m(00nmm;0 m 8oZ4FdW .gpcp p do m2 - g0m U0TI = cUk* ccc 0001 'CC00oa7C9m(mota9w m>>FH7fF7HryU27fJ a 0 o O m N N NNNN m 00"w mnO OMON N N m O rN 8427,/, M aNm r m O • 8 1- Om N [ 6.i4666 hN0aa OONO mN147 N6 'NMQmOr 060.- M a�0 O n ....8.--,,,No N N N N N NNNNN N N Cl) .71 0. � N.-mpo O O mu,. OMMa a M N N M04VVI r OmN 0 sr, rm N O N M M N O n co .-MO MM66666no 0 a�onv (o.-(DO vr000 (0,Q • O NOW6 66666 mmma aaaaan.1OCm 0.066 (D.-MO 9Na^ NQQIQ emmaNMam Nm Nam a_ NNNNN NNNNN NN .- (1) LL e�Wm.,. N U M 7 w® n 0 ili2448 n m amO 0 rmINy ^0 O OOM N rm h OO '7-.7,222 8,724" AmV NNmNm r M M M 24;2,2 2 W N . 222 MN omai V44.4 roNrm1 .i=g 0aaavgLi; at QNC2N ,.- ... N- m.1M Q 2 a O 0 CI m a W [1,—,4t,;(6 O i .".2 NZ0 Ni c '0 0 0 0 QNMO -,f2';.42, n -0 O O 2,7,'42.1 Na nn 0 0 0 82.722 N O mOr m M O 066 0 00606 66 06 0 00NO0 Onmm OO.-.-N MMMQQ Om N w mNN6� , m-. m($m Z° ¢Nvo 00 2 a¢m(¢o N(ao 2`canorn� m ,„ LL maadtha0o'D. zzz0(�i E QIG Z O N N N N NNNNN NNNNN NNNNN 22222 NNNNN 22222 NNNN 0'vn vi6666 00 00066666m6vmavmmC amC m o j¢y ^NMaO0n 0NO� m6..06 0O ' M -- ' --NN NNNNN NNNNN NN N RU7( C 0 W E m W , N _ C .. NN alr0:1 a; c In N . . .o--.0° .m b m 9 qC U T OC G Ge C m.2 l o a- 4, 4,-.2g100,2 0 0 0 g1a m e = 0'U0.0) mQO m FO J J O0> 8 0 • 410 VrJ:.•O pIWN.- mpiOrO W NA�O V WNaa OC')NM [�)N W OAOD «MOI ACIN ANOWODO NWO1A1� W rNt')rmpi 0 ) mOMVW000i �OOam0^040mhOOOOWmNMM<hOmmmm ,MG M M CDCj CO •- .1 000 WTWW pppMOMMWWWAApO.. MNmmmWmrAPAWmApM aONC 00000 M M.WWOMMOWMOW MDDDD 0MOpCO WO p 000 00000 WWWWW WqWWW WWWWW WWWWW WWWWW WWWW WWWWW 00WWW WWWWW WWWWW WWW WWW WWWWW mmmmm mmmmm mmmmm mmmm mmmm m m m m m m m m Q • cd co m OD aD OD no OO 40C0 0ODDDOCO m COmO 000 • 0O O000 PPP P•tPP PPPPP PPPQQ QPP0P QPQP* P000P PPPPP PPPPPaPP0PPP0P* PPPPPIto eitel loll . 1 , 111 ittli olirl ir . i . 11111 11111 11111 11111 111 CO P P P r OIa W W m m M N m m r m M OOAWN ,..WO WWOWN M.m,W mWNOm MmmmP ,PWM. NPMNm 00m,-m WOVMM mAOPW mWOrm . MAAom mWN.WPM.NN .NM, mmMMA mmW WONM rA0 WN0,-NMpNAONmMrWNNNrmMm{ Np AMWONVAAphMNYnmoNMPvNNhVO ODNR ) YmON PNOt mPPPPP QPPPm mmmm ...ow mmmmA 0000 mmmmm WWWWW 00000 OON NNNMM MPP JaaaaOamavaaa paa yVmmmmmmmmmmWWWWWWWWWWWWWWmow a NNNN NN yMa MMM MMMmMMMMM NMaMN NNN MMM ) aaaaNaN NNNaa aNaaa NNaaNyppaaapp aXN Odd O O O O O O O O A G O m 0 0 0 O Oo O O o O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O Odd 0 0 0 r r r 0 A r r r r 0 rrrrr rrrrr r AAA A r AAA r A r r r r r 0 r r r r r r r r r r r N 01=1,..3,- ^0m,- m r O M 00000 N W N m m P m-m O m m 0 mO m r A 0M m m r m m m M A WONO0m,m ON000 0mANOmmOP rmmm A M N A M 64666 CON-N0 M"`mm mm mm m r r m W O O•- N NIpM M P P mmm 0 U N0)0* � 6.664 O m 6 P PPP m 0 N 0 0 O0 0 0 0 Nm U OmD 0 rN P l� 2O mAm WO,NMPmmm; ,NMm w333 SSM 32222 mpmmm mmmmm 22220 22822 22222 288888888 22222 mmmSS 222 MMM ..MMM MMMMM MmMMM MMMMM MMMMM MMMMM MMMMM MMMMMMMMMMMMMMMMMMMMMM mmmmm mmmmm mOmmm il m mmm m m mmm m m mmm m m mmm m m mmm m m mmm m m mmm m m mmm m m m m W^NmmNNm N m 0 W M W mvi M0ui Wui,ui m mui NUiImn uPi ,vi m0,n Mui W)Ui vPi vO mui Ovi mui OUi N0eP0i m0IO rUP]r WOrnm0vi Vvi P O0ui 0vPi mAvi P0ui r P .0NN NMMm rW,Pr OWONm NWWON OmMW W. .0 mN^^M m0ui0W Mvi mvi Vrmmr�rn, OPmNm OPWMr NNIOOm 64O60 m^rPO 6666 mV.- VPNW Mrai.4 WMNN, NNW NNNNNNN ,,,WW MMMQ yyMMCOMO .`NNNNMM MM MMM MCia PPVVPPPPP mmmm mmmm Z mmm0000D00=000. D0= 00,00NNDDND00=0000mm0 m0. DDMDn0 00.0Mm0 000WW. WWWWWWWWWWWWWWWWW�WWWmmWWWWnnWWWWWpWWWWmWmWennWnnWWWW 0.uuv .n mmvi W r M P W mmm r N(000. P O O P P m O N M 0 m P m WW,,, m m m m m O N N m m N W O m N Q r N 0 O m P M M M Q P^m Q m Mmm M N m m Q W ..M.0 P,-Q O Q VV.,. P mmm m O N m W, O M m M W M m m N N r O M m m V,0 0.... GGGGG MM... G G N t V N f V N N N M U) C)N N P P N NNN N N MMM P M N N ,E2C,-,7; 22 NCD Q 8P4'2, m g2gM ONDmOD',2iO OrN NN 200 CO NmNNr 2822°4 VU) 0 2A228 "N IAO mN 2P2 NmN QCU) rNmQ W tprN 64dr6 6.m6GIS ON W ren MSO W m ...66 Mmm m0Nam oi�vr� . Nth'^N mm mr r M m W W o O,-NNM PPm mm ,W W W O NMM P tmh MCAI Cm10 ,NMP. ..MO, hN 0100 MO N V V ^ ^ ^V ^N N NNN N N NNN N N M M MMM M P P P P Q P P P P m m m Z ER r m m<M mV OmA Ten 22222 Nn O nO 2'22:2 22822 W MOfN 2821? 02X2q N40 mA P,'8222 Qa m a 0¢p r m 0 0 0 0 00 N m O P m M r N m 0 P W P W m O m 0 P O m M W m M 0 W m Q ,MOM, m m P N o m A m P M N N,0 0 000 O O,,,N N NNM P VV... r0 0 mm W NNNNN NNNN N N NNN C1 M MMtMM Mlmhtmh MM MOP V O V a V Q' m 0 CD CD M N P ✓ ^ mmren mm Wr^N�-m r mO y O W M a.m.. mWAOm ,-4646 PMPM 6 O D m r m P 0 moNM ON. N m NWm PNOWm NmQPA OmPmW WmPm mMOON .M.P. Mm W0mrM NM. p ONWmN WmMOm mtONWm PMNO OWOOo WNMmr Pr.-mW mMmM mPOmM Ohy pO'^ NNNNP Nmmrm WO'MNM PPmmr WO^NM aQQAmm NNamY mWmNaa mAWr n r C C 0 Q yMOAV ,O W ,,,MM MNO ) . N-V m WV,0OU) N M,N NNN ,m m,m-m m NtQ N � m0 Vm M ...MO, . . CWP UmNN M, N O rPO 0PmP OmNMMAVNOrWmOmMO�NMWONhNm 4.. 1 '^m N ^ hN WenDO) NY NmrDM O W,W NV... O ,WO NNN NNN NNNN MMMMM MMMMM P PPPP PPPmm mmmmm m r r 0 r r r O J O^W A r0 m m m m m M P W W e�m M r m m 2, P N m^W M01-00 ,- m W m 0 m M m 0 m m N r m P M m r N m r^N O m M T W a m O m O mNm P OAP^W m O m N W corm‘-. Ormmm 0 m,0 N m N N A U)m W m P Y m A,m M N N M m ,,OWN W r m m CO NOON 0000). NN 0P W m tp^AN OQO NM OIOM Ot- ON W r`h 6.-066 aa mmmmm W O �NMm m �0IpO NP0 W^Pr^ PO N 7 ' ^ ^M^`m ^m m^r m O^W DN NNNNN NNNNN NNNNM MMMMM M MMM V V V V<C P a V UO)m N)V MOUWI UWi IOp m O U M ` • MMNO� q� P0oNW< rM, NmaaNAp0mVhVWmD0rmMOO,-.MWD 0UDAPhMM UNmON NO MW.,. Nmh r WPmNm WMOMpOONWoVpO ^AM, OAM,Mm^W6MMM,ON PrWNP rM,V. mD Nr NONON OWM N NNNNNNNNNNONNNNNMMMNM MMMMMMMMM mMMNNN NNNNN MM MMMCMOCh hCIhMM M MMhMM M W^0 m P 000V, N m 0 P W 4-000M 0q W m W ...VM V m W P N P O W m m N P N m N O m P O P O r N M P 00.V. m N m. P m r dl m W O N N N N N N 0 0 o W m m M O m m m M P m P M 0 m m O 0 W r M m N P m m m P O ..MM, V W N N W P m m ^m O P mNm O P 0 N m 0 P U j m N m W M 0 P m P m^ 4r66. moC)Nm 66.-64 F 6 O^CP O m A m A 66666 P N O Mm mOMmm NNPAW MmmOM mAONP mW,Mm ONPm mONPm mONPm mONPm WON NMNNNNmmmm mNNN NNNWW WWOOO MMM MMOOMMNNNN NMOOm mCOp NN NNN NNNN NNNNNNN N NNMMM OMCOMM m MM M M M p.-comm^m P M m N O^M W m 0 P m P._m r m P M N M m m M O m m N*m W r M M NN O t m W P m O m W W 0 .NOW.o A A W m M A m m*m A m r P o W W O o o W W N O r P O m m N W A M 0 0 0 2 O m W M m N 0)m m N 0 W m m W ✓ 444 44444 66 PmvPin mmmmm n 4)GG G 66666 44444aa.aGN M4.6 6444446CV V< 444 PP mmmUU mmm VC^ m Qen .,ON, rONr 0.00. P MP Q r r m N W W O MNN W m M r W W m N W O W O m r m 0 W W M m M ^r W r N NNPmm m000m N0Mm mWNm mM7m0 MmNOm MWmNr Q0Wm0 m O N NNO UIUvincti OOOOO 6p6Or Am000IW NMOm mrgymW oONNCPP IOrr mWWON NMP NNNNN NNNNN NNNNN NM^MM M MMM M M MMM M M MMP Q Q P P (3'000 NNNNNNNNNNNNNNN00000 NNN NNNNNNNNNNNNNNNN00000 NNNNNNNN N_NNNNNN00000 NN Ovid m O m O mO m Om O 6.666 m OmO m 66666 mOmOm o mom 0 66.66 o m O m 0 6.66. m 0 h • Q mW..m QamW00OO �� WNNN m VYOPOW . MNNNNNU ...W0WWD0OONM + P <ah 0 . OOr WMD 0 N NNNNN NNNNN NNNNN NNNMM MCIMPIM MMMMM MMMM M MMM M M MMM M M MMM M M M M 6 CD C) 0) N U) C) C m 8 0 • • ru m0M V WmN m OAm a 0MmMNWeIN _ 0WyyAR!!0!!! WWWWWmmWWW WW WWmWmWWW mmmmm mmmm mmmmWWWWmm m m mmm m mmm .- .- 6 mmm.- .-mm.- M mmm.- mmmmaaadddda d d a x a aaa a addV d d d d V d a d a e area A.. ir . oo l o o o o oo . o loollet .mn O M O Q.- O m a N n W M W m W .-.-M W a n A M n m'-W N n n M d a A O A N M V m m A m d M to V X01 V O�NM aaM W m N.-Mn W O NM M N�O mm d.- m OMtn mmm m m.-Omm mN m .m ,cnOn t`�MNV, 0.0MN V.,0M0 o ° vmmNs WMNVtnn Nn mmm°rs nmN., oNmmO MM..- CD V d vl vl vl m m WW,,, m m m W W M W 0 0 0 O N N N N M M M M V a e ...OW m m m n A „ WWW W W W W O 000.- MM 0 0 -I TrW WWWWW WWWWW aVaVVaa O1VvoOO 00000 00000 iv.. MMMMM Melo] NoM MMMMM .-NNN MMMMM 00000 00000 00000 N MMM MMMM N O M MMM M M MMM M N MMM M M M MM M M M Melo, M M C C No 0o NO nC oo G G N G d C ciG G G G O NO O C OO nO 0o Oo nO Oo 0o Oo 0o Oo G n G G n C o0 00 0O o0 66666 00000 66666 0000 M=m mm m M O m m W m m m M m a M O n V O .-a m W N 0 N n a A A a M o m m W.- C?V m co.... M n m 0 M n m W N to m d W N m W .-d n O e ,MN., MO.-NM Nam.-m m Y)N N d d d d m m m m m m r EO�NW W.-N W W �NVhW VAWOWW4NVm6mWNNV.W oNmNmWW. a ,WVmnWNV NVhnWM MON MM W O O O O O O OVVVVV N N N N M M M M M M a a 0 0 0 0 0 cow... 82828 m mmm m m tnO tAD m,m m ...ow mmmmm m m mmm mi0 m m m wow.. mmM Mt0 M M M MMM M M M M Me/ M M M M M M M M M M M M M M M M M Me/M M M M MMM M M MMM M M M M M M M 00 00000 mmmmm 00000 mmmmm 00000 m i 0 m m t 0 000,00 mmmmm 000.0 mmmmm 00000 Melt.” m m 000, O M d a N m m n W O t0 N O A'-d ..MOM A N m d A M m n n m m an d N W O M C WmM .-W W.-n m.-t�)�W A«W.- hN.-M W MMthn NI��NOI tM.,ON MSI tOW W 00.-NN N O W.- maN� OW,. m Md .- n lam W O�NN Oa.-mm mm W 00.-.- NNMtnto MM add66666 mmmmm mmmmm A 666 6444 S to.-e m t0 m W v-N M Q m n m W O.-N M e m n m W O N M a m m n m W O N M a m 0,(0050 N M Q m m m W O N M a m w wow.. m n n n n A n A A n m mmm m m mmm W W W W W W W W W W O O o O O o 0000.- N N N N N 2 W. W mmm W W mmm m m mmm m m mmm m 0 m N W W W m CAO W W m mmm W W W W W W W W W W W W W W W W W W W r A W r A W MM M M M M M 0 0 W M W W W W A M M A 0 M Orn W W W W W M W W W W W M M O W M M 0 m M W MOM M M MMM M M M W W W W W W W vI.- .-.-Wm.- mmmmm WWWWW nmmmul �nmmin vl mmmmm mmmmm mmmmm mmmmm WWWWW mmmmvl .-mmol o pN, NO2.-MO N NNOM OO MNrNm 00000NOOm ,MN,. W MN- 00O - mb 0ON YAfD WtO mmoNCO‘-.040 NNWMV oMN CCC GCCCO 0000., OCOC OCG OCOCO ., 066 GGGGO 666 W=O o m m M N W N-a m vI N W n m O N O n d W W'-W W O M m a W.-N A.-m .- a.-m M d W.-d m M W m m n M N M M M a W.-N W.- W m n M m d O m m m 0 m W a W M m a W Q W Q m N A N .-m e m W Q n W O N M Q m W M m m O N a 66664 W M m M A N m.-m N 66466 n-mom 64M6,1 N m.-m o 46m.' - m O a m N ,, -666 A mOe MO m m W O N n n 0 m W N a W n COM.-.NV n NV.,. 0.-M V m ,030.-C1 a m n W O M d to n WO.-MV W O m M WWW,, n m m m m m W W W W W W WW 0 0 00000 N N N N NNN M M MMM M V a V d V O d m a m.' O<OrM N e N m Nh :;::::: mWn^Mn :;:::: Nm0TNnOnNWW6W NW6WNmWQp• M ' Q O0A ,OoA m0CMMMMMGOOm0DAWNM am,.- O !NM dn0 ONMd O NMV WONM ammnd .-mm mmmm mmmm mWmmm WMWWW WWW Wo0oo 0000 �Q]a Wmmm m m W O m ONm mWNW WWN dpONM mmmadMmWMn A.- � NMamA ONMnaNO MW .-riNOn N0 .NVOo ,MOA OO `M MmnWO V , amA Oda WWW _ ❑ 0=0, m N m W M a M W M N m MAN W m W m V Wa V a n to A W 0 tp N m ,,.MV W N W N a m A W .- m W n ..NV _0 O A 0 A m W 7 N M M a s M M N N O M O V N W r a m.-m M O A a N W CSI W.-0 a m N m 0 N in m N a 0,W W O M a m A W O N Mth Q inN OOm 0 M 66(64.- m ma.- A nNN 666.-6 Na.-OA 4.-66M .-amM .-MvMo M Cha.- 6666 ON amA MQmmO NMnnW .-NammWNNN mONam mmW.-M ...ON 0mnm0 ArAnWONdm Q Wm WWmmW WWWWO OOOOO N NMMMM MOadd VaVmm ...Wm mmmn n W W W W 0 C W ZO V M.NAm N W NWr M W<Om ,LmN-TO W W a W M CWOv W xM V WNMN fQm Od)�V AOa) ONM V m .A.MN CNDON V D7 W A 66664 W .-M N m.-m o 6 W a.-M ,.-666 .-mOo W d.-M n ;;;;; ;; mWmmOmr mQ00000NNNM Qmnnn .- DOWm mMwOOAm00 NMMMMMMaeQQQVVCONTtaW W ON HnOtmn 'YWMT mW V Oto OM2X6Y'nCm0 W mWWO N V tamOtNhrgFNammtpp p~ NNAN000OMON VW,,OIh Mm t00 Cn0O N V TN W Gm A A A n m W mmm m 00 W W W W O O O O O N N N N N N M M M M M Q a 00 Q Q m m mmm m 00000 A!�A A MM M MMM M M MMM M M MMM M M a d a d V d VV d VVVVVVVVVVVVVV a V V a V a d d d d d d d a V d a a d W n W 00.-.-N .00.-0 .-m m m m .-CON N m M W N M.-.- n O m W n V V W O 0 V n A AI `M n W W W m (0.-VO Q m O N V m W N m m N m O e W .-o m N m V O A M O m N m m v- W n m N O O W W W W 0 0 MiCn O N Q m m O N O 66 M N.-6N 664.-6 m M.-mm M.-.-m M Aa Nom n NMN N .-mYM.- O tintp thtep ,tpmWm ON V .N.M.-CND ma mmm W M.0.O 00000 ONemm W�M�nm W ONV. MM`M amaino NIN '4'4444�nmtp a mm0 M th AS M M M M MMM M M MMM M M MMM V V add V d a a d d a e V a a V54"4,-a a .74-434 V V a a a Y V V a a e e e e r`OO O O O000.M a O O W a M m M M W n o.-m W W W W M.- 0,... V.-.-W O.-W N O m M O N N V‘-,V 2 - O NMaMm mAn n mwWO.- NMMaa WMNMd eVe mmmm WW MOM. ~ v4 N NN 6. aheeeh 44444h66 666.6 WWW.iLd 66666 WWWWW m m W W6666 mh NNh6. . .... l .66 .. 66Nmh NN.-hh Nomm0 h mow..m m m m m m m N M 0 m a O n n N N M U) N M W m n WMmQ m.-Wma MNN mann WWW ,WW, U)Mo VVnm0mm 06006 000NONN6 Nm0 OG 4ee40 e0MMM MMMMU MMMMM MMMMM MMMM aaaaa aa aaa a0 * Va006da0V V a d V a a a a a a a V a V d VVVVVVVVVV V a a V NN00000 NNN NN NNN N NNNN NNNNN NN NNNN NNN N00.200 NNNNNN00000 NNN NNNNNNN N N N2N N NN N 00000 NN N • 66666 660ri C0m 66666 66666 oN W 0 66666 omOm O.-Oo 66666 OmONO n 00MU)U)0U) 66666 666o 6666 ohN m0 M.-VOM m0U) NN `aWW MMOWWWWV 0000WWW 0OmW WWOO NNMMMM 0*ae0 eVVvV Q*0*0 a0 aaa0d aaaaa 0Q0 00 vast.. ..... U) (�I 0) N 8 0 t a) C E _ 0 O ❑ • • 0 y:m m QQ NVv-MVV MOOM V. MONO. Om 0,Na Oa.�W^P AO.-OV O M,O mOMO� V N.-�V0. 0 AONNO 00MWi . MO - W rV, M W a M.0 2 0 a W a W N W O M m w N a m n r N w A 2 N WOI a m A O W M O 000,20 O W W Q N N.-wm W2a MrmaM .-OWWa OWWa WMOW 2Nm2V MmNrnm MrnmMO 000000 0mrrrr 0MMmNaM(00V VM,-OM W mW ,m A,000 10000 0VVaVV ac000 0(00 ) Na(0 O W W W W W WW W W W W 0 0 0 0 2 W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W 2 J m Wmmmm wwwww W wwwww wwwww wwwww wwwww wwwww wwwww wwwww wwwww wwwww W W W W W W W m m m m m m m m 666 m m m co 66 m 666 W m 666 m m m m 666 W W W W W W W W W W W W W W W W W W W W a a a a a a a a a a 44444 P a P P P a Q Q P P Q Q P P a a a a a a a a P a P 4444.4 aaaaa a a a a a a a a a a . , . 1 . 1 . t . e 11111 41111 11111 11111 leeoe imill tpill 1 . 11 . ^P N Q co m co rn co 2 m m m 01003 m A N .0v a 4 a co co con.-r co O m O co worn 0 0 co OAA W 4 m r A M CO w O4 �a OAa� W A2PM MMQ2 W ONfV OM Nm02� W OM W 2 a2mr� OMwr W mm�m� W MM W M 26.666N -MWN mM W N M 66446 a 4 a r W M V r O N ,n 0 O tM•10 0.-M W W v r M N .[l O D tW+1 0 Omi l CNO.�- V f p O N 0 O V A O f 0 W Y r O Y N N N N MMM M b a a m m m m m m m m AAA A W W W W W W WOO O O N N N N M M M a a a m ...OW m r r r W 0 22222 22222 22222 22222 2222 2 N2NN2 NNNNN NNNNN NNNNN NNNNN M MMMMM MMMMM MMMMM MMMMM MMMMM MMMMM MMMMM MMMMM MMMMM N2MMM M MMM M M MMM M 06000 00000 00000 0Goo0 00060 O0 00 0O 00 0o r00000 0!0 010 010 010 00000 046600 00000 66000 0 CCG 0 w^m a 2 M O w 0 ,2 0 0 N N N a m a a a r M M m 2 0 m a M O a 2 rn r a m N r ,00)00 N OMA N ="0 m vI 2 a M N N N N N N N M a W M m w M m M w 2 N w A a M N N N M a W W N A N w W M N 0 0 a 2 m m rn 0 �O o O m N W O P W N W C P W N m 0 4 6a r 46046 6 6 an of r N r N A r N r N 6 a 6 4 o m N W a 0 m N W a 0 W M W 6 4 w M 2 m r m 0 NOVO, MO.-Ma M PWA W OMVW A WON M m W rn�- N P 2 A w O N M 2 A m O M 2 000.-M 0 0 0 0 0 m 0 0 W0 0 0 0 0 rrA A r A A A A A n A n M M M M r r r r A A r r r r„r mr mr n n r r0 W 0 M M M M M M M M M M M M M M M 0 0 M M M M M M M M M M M M M M M 0 M M M M M M M M M M M M 0 00000 mmWmm m m m m W 00000 00000 WOW.. 00000 000,00 WWWWW 00000 mmmmm 00000 0=0 O 2 N O 000N, aN.-.-m V.-,M0 O N 2 0 N ...M.O.- O V M,M 2 W W 2 m N 2.-W P O W M 2 w O A N M01-00 C m M 0,010, a,-W 2 N O W m P N O W A W 2 a M M M Q 2 W N W W A P 0 W Q M N N N M M 2 m m rn (0.00.- N a m r rn CQmrN • 000ONNMV .0,WM .-NVO COaNMVO 0,0rMV0W .-N 66r.:66 O 0(.0 NMa2 0, 01WO 0, MN0 , O L r Mr Mr OIr Mr Mr 0,r 0r 02A 0,A 01 MA aA Mr aA WA MMMM MMOMMA WA OA MM WMMmA� 88888 8888 8MOA mA A AAA A ,,WWW r r r WMMMMWM MMMM0 „ , r r r r W 0101 Www WWWWW www.W MOM00 0)010f W 0 rn W rnm0 W AOww ..0107 01010 W rn rnrn W W W rnrnrnrnrn rnrnrnrnrn 2 22222 22222 22222 22222 22222 22222 22222 22222 22222 22222 22222 22222 J V ,.MMM 0 0 0.-0 w a M m r 0 N 2 W r 0 M W.-N 0 N V N W W W N PA000.-M O OM.-Mw a W 2 N M mNaaa Na 20 PMNM VNO, NW Cad 00000 00000 00004 66000 446o0 44460 40044 04044 ON44O 46464 400E O 40000 • N a 2 2 M M W A W P M M W M 2 w w mw r W w M w O A Q N W N 2 N w 0,01.-VV ^M M M O a r m M n m M r m w 0 N M 2 m m O N a m rn N m 0 M r N.-040),W N rn m a N O O rn 00.-01M m rn N m 0 m N O W r .- W W N W N W W • 6 M r N 0 W 00(N0 0 M 4NN W 0 2 w Q WMAN Nh N W N A N A N A N W M w Q O W A 6666 Q O r M rn m N m 2 lNaa2rm O4Na2 r a2rmm 0O.-Ma mrMON M2mmrn Ma0r MONa2 NNONM WO N 2.222 WWmmm WWW,, WWWWW WM000 00000 00000 NNNN MMM MMMVV - .. ...- . ..-.-.- ...-. . ..... N NNN N NNNNN N NNNN NNNN N NNNN N a 0=0 r rn w O M 0 m m 2 a m m N r m W000.- 2 NWA M A m o rn ‘-000,0 m m r m a N m a a W N rn m a a2 NW W a rn Z NW02 co NA N NWMw 2NW Qo coaches.. N WW PW NWP OrQN0 va M NN nos a M va. r ^ ,0 rnrnmmr rrmmm 0Nasa as aa4 44 622 mmrrm rnrn0' N N00m nOMy4NvaO WO -NM 20WwO N MQ20r ON MM00WOVN MQ20A 030).-NM .mrm NNNNN NNMMM M MMaaa aaaaa aa222 .2222 th W m W W W W W W W d Q V W M 2 w 0..0. N O O M N m a N N N rn O N a M m W N m M 2 .0“-COM rn W M W2 2w r0 aNM m =` MMN'- Ma2WW OMWwN OwQOA MN N 0WW -a 2O^P NNNPW MOrMw th m 466oi6 6a0n4 •66oi6 n4466 6066a 46n6a 6r.c0 04066 D6vMN 006 6666n hrmm6 O 00).-MV mWO•-M 2AWO Na2Aw NPWW 0.-M2r Mata WONaW WONQ2 Aw•-M2 WWwwwww000 000-- r2 N NNN N M MMM M a a a Q Q Q 2 2 2 2 2 m m m m m r r r r ,,WWW W W W m m rn M M 0 ..... .-‘-N0404 N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N th ❑ Q W {p a {p Q 0E. V M tM t0�I N N NNN M O f I W n O 1 r m N m O Q N 0 V 0 0 0 O N r m n tN•1 0I, N V YMl 02 0 N 0 M V O W t M W N 0 V O 2 Oth a 4 m 2 N W 6 a 0 r 4466 O A O N W 64466 P N Om W a N -W A 6 4 a 4 O W WAW 2 2 Q M M M N N 4 4 4 00666 0MPM 00a 0004� 6mmO4 MNNMMMpM 0Na0 mrr , M00WWMMM MM0 NNMMaVVVV .0000 rrWC0MM - ..... NNNNN NNNNN NNNN N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N O 8E2 Nr m 2 2 a M WGAW Q M M W M 0-mo. -wom w M w O A a N W M m.-a a 'r m M M ONamrn NmrnMA NrNWm aNOOw OOINNM mrnNm0 0N00A A N r a r m rn 2 M T .0)0400) M 2 W 00 M N W 6 N V 02 N2 W 0 PD,W 6 6 MA V 2 0 2 w 4 6 crmNr Nm m r NAN 0 ND 6 6 ' W 4r 66646 rn242 a0r M W m Nm24 N rm O.-NV. AWO,-N 2A.. ,MON 2mW0) wONQ2 wONM .,WON m0mWWWW WWW,, OW00m 0OMW M M M O O 00000 N N N N N NNN N N NNN N NN N NNN N N NNN N N O V a � m MamNNrO NVO WW03OV.- 0Mr00 )0,10eVWNOM OM ,,WM NOrm, 000,M M W ~ 0ONV •, NWONa02.- , W.-NVOC - V •Ma •em, N ,00022020W64MA 0 01MN ONV NrM. MOZTON • 0.0W m m W W m W M W M M 0 0 0 0 0 0 0 0.-4 (0 N N N N N N M M M a a a a a a 2 2 2 2 W W W W 0 0 A A A A AAA W P QQPQP QQaQQ x2222 22222 v`I2222 22222 0.n ul22 22222 ....2 22222 22222 22222 N M 2 N 0 .m-or N r 0-2 .-r-. 2 M AO O O N a N 0000.- O N a.-2 O N O m a a r N W A N W A a N A a M 2 m m a A.-a WM.-VW, W w w 0 0 O w W m M T 2 w N 2 A W W w w 2 N w Q w Naa a M 01 2 W O a M a M a 0 m N N O m r 2 a N o 6 r 2 M N O m m a N O rn A 2 Nom 0 a466a O A a 4 l V O N Oi 2 CV 064na 6600oi O +M w P C O4 A 20 WO.-MV hlll . M0. aaaa . �V VVVVV .. .Ouf .. 0 vii.. �22 0NNNN (N,-*(N WMMOMNNO10 * N*0.-W V003.-0 NAM0N W A0PN N 1-W 0 Q 010 OP-2` NMMN MN f rrmm2 O0020 m0rmm Wrnrn'N NNaa NNMNN e= 000NN0600 ON2ON0HN00600000hhh0N0N h 60000000600 60 0 0 0 b600T T0N0 220 0 ^m M 0 1-0 WC w 0 NNN.- O(0N M 0w W A M N W M 2 N 0 O N W ,M M w M .MMM, 0 a m N 2 aa War mWAWm mw010 mrAWW OMa00 NM 02 rOrnMr O 2 PaP*M N NNNNN (010 N M MM M M M M M 44444 22mmW m W W r A r m r W W 66600 0 0(0 lYN4N YYIAN 0 Q aQaQa aaaaa V V VM as aaaaa aaaaa aaaaa aaaaa aaaaa aaa22 22222 il l ) )iI. 0 NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN N NNN ▪ 66666 20202 0 2 0 2 0 66666 a06666 m 60666 0606060606 66060 60202 06060 20202 40044 mNco aW wPWw 000Ma OIM00 00000 00amw ON00a *50 * 6 6 000000 cc0Ar„ 0 m t00 O 6 a a a 2 2 co m co W AAA A 66666 1[1 2 2 2 2 66660 66066 66600 W W W m W wwwww m m m m W 00000 W W W W W 00000 0 W 0 W W 00 1h O) N W U Qc 0 E � E o U ❑ 0 ,.,WV Dm N Oe OMm,. M.000 MWWaM WrOWN WrddO WMdWW MVOWWrM00OMNOW OV,.. �ODWmWO. �NWmNOTN . M.00 ..M DV.,0 W .. WV Al NM,C10 Nr W m� m W mN� lQ .JCp ^Q m O m 0 A r a W a W N m m N. W N m N O W YN O N m M M N N M m 0,..M 'NN. WOW amnOMN.-.- OWN., Mm..OW ,m 00000 OMM WWWDR m ,, mT0.Q M 00WOm ,,. . OD 0..Nm mm ,WmmW mmmmm ,,WWW mmmmm mmmmm WOW.. .Wm. mmmmm mmmmm mmmmm WWmWm mmmmm mmmmm mWWWW m m m m m m m m m m m m m m m m m m m m 66°6,66 vvv eeev vvvvvvavvaevev Q avvevee vevevvvvv vvvvvvvvvvvvvavv v or W MA ODm W MMmm �mmmY) rm�W M 00'-d W W m NNa mod•-A da�Y)0 )DNU)�U) 0 W r N W m WN WV W pONoM .-m woo, ttpp ON.ma W W W m arNO OQ W NM A WNW m rammN COh�.ppOmM rmm mNm tdtpp MfDr qNO NM mNm W N .,0M�[) r0f W atWO mmMmO �mmb� NOO M mm..0 0.n�f Nm codmOM, M0)dT • Ath •� m mmm W .W W W O 0 0 !- N N N N MMM M d V a a m o r W W W ,...0 .-N M a m m A W W 0.-MVV ...OW W WON M 9 N N N N M MMMMM MMMM MMMMM MMMMM MMMM MMMMM MMMMM MMMM d d a a d a ammd dm dm ...W. mmmm mmmmm m mmmmm m Nm Ym)mm oW mW (V MMMMM MMMMM MMMMM MMMMM MMMMM MMMMM MMMMM MMMMM MMMMM MMMMM MMMMM MMMMM 0 0 0 0 0 m O O n O 0 0 0 0^ O O O^O n 0 0 0 C Oo 00 0 00 0o OO O O O Oo 0 0 0 0 0 O O O Oo 0o C COO O OO o0 0o C oo .66666 WPo= m W o,m AAAAArM N M a r m m N d W a W Wr N W N m a a a rON OW WM OW d C OMOV .WON, mWOOm (MOM TmNr r MWWW mAmMm OW. .-MaON XMoiOiN Am MdQOQ Or:M46 MMaas MamWW 00M.- 66466 O.-WdmVmmAW mrWON doW mWAQNO oMWoN mNWNQ mmmWO M.WOM nnnNn ^WD^ D DDDAWrNNWWWWSWWppWmm0 .L-NM TTMTT ppWpW WrD DDDW WWWWW WWWD WWD0WW MOMTM WWMm , MMMMM M MMM MMMMMM M M M MMMMM MMMMMMMMMM MMMMM MMMMM M MMMM MMMMM mmmm m ...WO ommmm m mmm m WOW.. Wmmmm WOW.. m mmm m WOO.. Wmmmm m mmm W WOW.. LW= No1�jr A Q m W r W mmm. ..-WW, W O r m a o m m W m m m W 0 an W M m W N C mnmor, WAmmo MWC r ) NMWWDN mond NMNNM pWOO� WrpM4 MN00 WWW0W oMWQ. MrMOcCoQN00 CO. rM W maNNO G_ Woo— W W TWW T 0 0 0 0 0 OOOO O.-N Md W N.MNm W r o a W NWO a W NA W O W M.. Om Z WWW WWWWW 8288 0 08800 O0000 OOOOO OOOO 00338 OOOOW OOOOO 00000 r r r r r r A r A A A A A m m m mmm m W W W W W W mmm W W mmm W m mmm m m mmm W W mmm W W mmm W W mmm W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W mmmm m h mmm m m mmm m m Y)Y)m Y) m mmm m m mmm m W mmm m LOW... m mmm m ..... m m m m m m mmm m mg r W N O o .00.. mo A r N W M a O O a a W N m N W N m N A a N M W N M m N O r m N r O m N N W W moo,. O m o m Y) m r o d comm . m N N r a r a m m W W m N d a W M m m W A O m m r d a a W W W M m W W U) .-m O 0 N a O r m W O O O N OV N t'a M Yi W NNN N a 0 O N O O O O O O O O O M MMM M M N M m a mmm oi N 0 0 0 z1.7 W M m h o m M N N W o o A o N WAN o O W m r W N r m r W M O W d N m m O M r W r O r M m Y)r a n M A M a d a m W A M m m d t r N)W N m N NNMm ..VN, W M W M r MOWN. r N M a a m M W m a W r M 0O mddAm0).�-a� W WOI AY).N-N rMWOiW ONWdW m0m� OWrW WrrOdOd 066M6 oi4riMO VeeQQQvONT TpNArNW mmWppNN 00ONNNNMMpVV.p. WMDmW OO.- e.00 MMMW NM MM NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NMMMM MMMM a Oi a dad a a d d d d d d d d d a NmOr Wmr aNr.-^NA,OMr Or Wr Wr rd mr m m N m m m 0 m d r r hW m O N d r W M M a m M a 0 N N O r m .MOO, 6OW OW r reNrQ WrN dmV 0MW Q 2= Oma, i 0mNo0mMOrm moCrN ODrmm rWD0 MONW0 CYOAa DmWmm MOW NMdd mmmaN OWrod M dOro r MWM Mmd0 ,ammA WWoWN MMamo WWWO WmWN oWNm° ,Mm WaWaW ,,WWW WWWWW WWWWW WWWWW W0N NNN NNNNNNNNNNNN NNNNN NN NNNNN Op 0 a N r N m N m A W W W :382;.722 A M o m '0 M W Nm O m W d O W W m 88.%.2g a A N m M M o O M o E,W 28'''r W W W ‘74282"2 N d m m N M W a a O m r m O W W W N V M r W W 0 0 W W N W�-W ,7,""2.4M m N 0 W o 0 p maN a� r V OOi m A.6v OI r YO MMOV 6.66 Wo ard rta M NamrW ONaWW O .rW MWWO M,odN NWWM OMMON NNSOMSSSSM NMMMMMMMMM MMMMMMMMMVVVv.e < evVSNNSSNm vo aroi r oo 0 FMMMMM . . + I M00.-NM V mmh hh p p Q n W M 1p A m.r m W N o d al N A W W O M M OO T N,070,0 7 O M m 0 o A M r W m 0,.M. W M N N W N O m N M mo O N W V M NN W Mo W Q O W rmM MuicOcic.i r W Qr dM Qom N W W rN ri YdQN 64646 Qd40 NNNMMMamae. p .-NNM taMWmm00 V QASOp0 p0SS NMMMa dMMMMM oV.WWr DDW NNMM NMMNM rMM MMMMM mMMMM + MnM 7MMM d add a d a d a, d d d m m m m m m m m m m 0 WO W M MWN V V N0,010 W V Om WM 'MfrM WT . ANmv V mMWm M.O rti aN nDr M.N.N YNrMDr WONVWrM0 T m rMWpim oNmYi vYi pYi �.Ol Yimm Moodr.O lo .crrMod 666MM pi.ov�prov.-ad 4Maoo VvaQrpvoNMWTmmWNrrNmm . Wm.-NN MNTOtppO wmwm.Yio srpi�� mMoi MviVNVoi mNWWWNN NOMVYmO ONNNMM Ma NNNNN NNNNN NNNNN NNNNN NNNNN N MMMM M MMM M M MMM Q evyvv d a a d a d a a a V O jx mYoTaw oMONM W.-MO, MMOMO oNMWW Nnar°Vm MVMM.- ,,WVWr ,W0WW NnVNm OrI,.M.0 0...0 ~ NaYOYWS Nma.-.on eTmw.- MVW,M M.-NMv W,..0 aoMnnr° .MV., Wp°r�Nrn TO,vm M.-VOM OVNW, CO CO CO W CO W W W W W W W W W O 0 0 0 0 0 N N N M M d a a m m W m r r CO W 0 0.-N- N N N N 000 h m m moo. m mmm o m mmm m m mmm m woo.. WWWWW 00000 WWWWW Wm r r r r n A r r r r r r r r W m o ld v m M O o r a m NNW O N r O r 0 O N O.V M 0,M.-. WaWNm m m M a. O W m W 0 W W W W 0 a W 0 M m m m W= W m r,M Yri hhM N dor O Q W M o W W o o m N W W ta W W M W.M O WIW Q O N N WO �WN 0NMNMMMN . p mW00W0iNTMQ WWWWWA �Ar AW rO no o.. WO O000 000Wo mOO 00.0. ...OW O. , A 0 om O m o W MWS 'W m m M A NNW a n W O N W N m m M M W m a O m m N m M W N N MMa O n M W M W 0 r m N M 2— O O N m W r W W W W m O m m M M m M W r m m M O n W m d r m o o d r d M O r d W m Q O W W M 666.46 mdnn4 060 T 6vcmm dD Ypp m6rinn r.:6644 mmYdd NNh h mm mmomm m.Omommmm mmm.0W mmmm comm..mm.O vVMMM MNS Q<<Y V` wow,. dMOW— .—www m m m m m W W O W a a m a m M a a a n n m a m a m N N W a m M O m d r d W �-N W r W M N M d m NV... o 0 o r W A m m 0 W m W W 0 00000 m o d m N m m ,W m m 10 m m O M a m m r.:6666 O tee- e�O W W W W r ma m N MMMM NNN NM M M M MMMMM O rM.-W r mYI N0 W W mr r 6.Yi Yi YI m mmm m m m d a a a d a a a d mmm m m mmm m moo.. T T m m m m mmm m m mmm Q a a a a a M MMM M M MMM M 2r NNOSO 00000 00000 00000 00000 0000'" om°r8$ oo mm uNYOn OWV.-, .V,NM ,M,NM Om1pm00 omo 6,66O6 OYio Yio YioYio Yi 66664 Od Nadu Yi 66646 aMa�odNrN .orr.VM orado� 46.M.pM6 TOI W q0 °(T,28' Nm'N nNSMM M V V Y< 2.7428 Or ODT W NMeh onT W 0 W NOWY V evmMM 1A0 Wr ODTO m o m m r r r r A A A A A r r r n r r r r r r r r r W m m m m m W M W W W W W W W W W W W W W W W W W O N O) 0 U O • • (17 OC Op N Mor N AON VO NOV�fpp aNN 0pp p A rmY h rpp D< .,NOM `M rO A Nm Naa m NOOM M COON C ' CoWtO mMW W OW Ar(60O,MmA mmN60 mWmVMm6NeW mmMmN .,,MM 0Wm0 mWM mWMAA WNNV' m4mmM o6(6. Wm4W (004 44(66W N6.-0N 6466 m440 MMNO( ONMCW aVQVYpMMNNNNNNW00r m(64MN 000QOOOOOOOOOOOOOOOO000OMMo J Y fNOOOOM mmmmm mmmmm mmmmmmmmmmmmmBO v.... wow.. =comm. 6066m mm mm m m mDDDOD 444:.4 mm m 4 m m mmm fp m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m mmm m m mm dQ 4 4 Y Y Y Q e e e e e e e 4 e e 4 e e 4 Y Y 4 4 4 4 4 Y e e 44444 44444 4 4 4 4 4 44444 r OA` moo,. m m o ON N W m rm M N N Mm m N N O M m W W 000,W V M m A m NrWAW Y MF m m N Ym m m,9N W , m OAN WOW, mOMW NWmmM mmmO mNOmW OpNWN mVMmW ,pWM,WhV000rhONONWYNmWV , ,00 wWMW. N«W M, .VN WW . WW M,W .hW 4(66mW rr(6m rmO,N NNMMY Om666WO,, NMYmm 6,mW0 0NNMQ (60Amm WO,NN MQ.Wm mmmmm ,,WWW mmmmm mmm mmWWW WWWWW WWWWW 0000 00000 O,,, 0 (6(6(6(6(6 (6(6m(6(6 mmm6 RnmQs ° R � gAAg8QgRAMMMMM MMNmM MMMM Mmmmmmmmmm mmmmm mmmmm MMM f i Oo 0o f i Oo d O O n f i ^t J n 0 0 p f J f i O f J 0 0 0 0^ 0 0 0 0 0 0^6 0 0 O n O O n O C i ci f J 0 6 0 0 0 0 O O OO 0 0 0 0 0 00 0o N W" O M,,m m m m m m m N M O O O m m m O m O m W M M(6 0 r m M NN(6N 4N MN NM ON,N AN,N NN (6 N.-A 6 Mm,f NO 6 ,66 AW N W6m6c eOMNO mQ0 66W N.-MO. Q(6mMW ANm,N MrmNW W,m,Nj immgNNWMMW(64mm (6 4NmWW MOe4N r644(6 6 m W W W W 00000 pOOO OOO NNNNN NNNNN NNNN N ONNNN MMM WWWWW WWWWW 00000 O OO OOOOO 00000 00000 00OOO OOOO 00000 0000 0 MMMM M M MMM M ..... er 4 4 4 4 ..... ..... 4 4 4 4 4 4 4 4 4 4 VVVVVVVVVVVVVVV 4 4 4 4 4 mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm ..MM, O M 0 6 M m O (6 N M O A ; (6 M (6(6m(6 .,WNW m m m^4 O,(6,6 ,W m M m N A N m (6,(6A O cm O M.-6 4 0 6 6 (6 O p e W A N W e M(6 Y M(6m 0 0 e N.�A(6 N, M W m O m N 4 M m W V N N 4 W 4 4(6N m r_ 46(010)04 0000ONM0O 0'000 000, V,OMW 00000 VV... 4)0Vm ^m0OM OWN.W mV00M mW,MM N M M 4 4 ..WWW r r m 6 W W W W W W 0000, M M M 4 4 4(6(6 m m m m r r ,,WWW m m m 00 W 0 0 0 0 Z mmmmm mmmmm mmmmm mmmmm 00000 00000 00000 00000 00000 00000 00000 mmmmm 0 0 0 0 0 0 0 0 0 0 0 0 0 0. .....60 0 0 0 0 M 0 M M 0 M 0 M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 M 0 m, m 6 .- m W 6 W m m M O W W W 0 4 MOOM.- 4 6 4(6 N.-Y m O N,m m m ttpp (6 W Q N 0(6m 6(6 (6 6 0 m N 0 6 M m NCD M M N M 6 0 m M M MOM 6 4 0 6 6 6 0000, 6 M m N 6 N W M W M (0.4 W m N O A 4 m os 000�0 00X00 000 N Noi.W 4 vv•-.-o ('4(00400 (661,:66 666 m6 VVVVV 3 W" m r4 N 0 4 W(6m m rM 71"31,%4g W60 W m r6 c7“7,1"-4 mMm4m g18'482 WWmN W4 N r 4 SW-R2 mr06 r W n M W N 0.-m V6 m r O m A64. fmWmMWQ sQeQ0100 mAWMm (6MMNQ r0M(6m ON(6mO mowocv M4m. ,WO,N NMY40 .TigsOWsgmp 00o, 000WO O,,,,4(6(6(6(6 ,,,WW m00m0 mmWWW WWWWW WM 00000000 44444 44444 44e4Y a.ee4e eeeee 40444 YY44Y YYY4Y 44440 Q4Qe(6 (6(6(6(6(6 (6(6(6(6(6 Q1 0= ZO M r N 4 M m 6 M W m N 6 0 4(6 6 m Y m W.— M 6 m W W 4 m 4 MOWN. M M m W 0 O O N Y O M M N 6 4 0 4 m N 600 NMMe N(6W(6W MMMM W6N N6 mW0 NO m m N 0 W N 0,66M.0 6 N M fp m 4 N 0 0 W m(6N m Y 0 0 m M r M N N 6 m W 4 0 0 66661-: m W N N 4 6,61,:66 0 m m 0 0 N m 6 A A 6 6 4 0 m 0 W M 6 M m M m M 6 N r N m .m O M A W O N 4 m m O M m m W 4 A O M m W M m W N N N M(6 m O M r 0 ((000)0 0' 4)N-0 ('40N-001 O O M W N N M M 4 M W M m m 6 6 6 A WWW00 0 0;;0 N N N 6 M 4 Y Y(6 ...WW 6 6 6 6 0 6 6 6 6 6 6 6 M M� M MMM M M M 6 6 M 6,WWWW 6 tm•I 6 M 4 4 4 4 4 4 4 4 Y 4 4 Y V Y Y Y 4 e 4 Y 4 4 4 Y 4 Y V V V V V a Q ea" e W m 0 82 6 fro Y .M.I 0 C6 m (6 0 23Z;r 222'n W N W :93E20309 NA(6Om M N N WO N N 0 Oi 0 r lM r OI m r 0 N<f0 tV fh W O 4 a0 PI r tV m O v r- fel 4i 6 6 6 66666 —0 0 6 tD 0 0 V O r O(6O(6 O m O Y W 4 W Y W N m m W O.M(6 6 W N 4 6 W N 4 m W ,M(6r O ,M(6m O N 4 6 m m 0,M m W N(6 m 4 6 0 6 Q 4(6(6 m 6 6 A A m m W W 0 0 0 O N N N MMM M Q 4 e Q(6 (6(6(6 m m m m m, ,,,WW m m W W W 0 0 0,, f0 0(6(6(6 0 W(6(6(6(6 ...WW 6 mmm m m W O m m m m m m m m m m m m fD m m m m m m m m m m m m m m m m m m m A A 6 6 6 0 N 4 W Mm 04664 WW.-WW W W,. W 00 V,o OM ,NW m, t601r0�0 6 W W rm 0 V.-W M .6-OW101r�.r- 0.M OM N W m fnM Z 6 W M 6 m N W m 4 m WWW,. W ONO O 4 6 m 4 m M m N 6 O M 66666 4 c .66 46666 4 0 6 6 ,6.66. C 0D 66646 6 6 mO.- N O O N M 466 'M N Y 6 m C0 .. 00�mN MYmmO MMMaVONpM WW,, mWpmW p0000,mWNNV ., rmm0W 0004 W4 (6 W WW MM N ,rrrrrrmr(6(6(6(6(6M.... 66666 0WWWWmmmmmmmmmm6mm666666 0 0= m W N O 4 W 6 m m A 4 W A 4(6 W O W m r m,4 m M m 4 m W W m N A Q N r 4 m m A 6 f0 .,,MM NOm.-m 0,000 6 60(00 6Mr W 6 O W MYN 6.... 6 AMOm WOW, 66(6(6Y N040m m.-(6 -N mNDN 4 �.-46A N W.-W 6 7 AOMm� ON1QOm W Mm WON 0M V mm ,�OO,N 66664 M V V 100 1m06fM6,6 OfW W OfDfQ44 0fW W WWWW,W, AOM W O NM40 6ONQfO V V V V VWW4 V V ,,,WW v. V V V V V V V V V V VV V V V V V V V V V V V V V V V V V V o00000 H 0VV V 40.. N(6(6(6(6 L 17 M'O O, M W O W M N A N N A 4 0 M r N W.00. W M m A m (6 NON—m 'AMMO 0 m r W 0 ,WW,, M 6 A m 0 (O m 0 r m m 0 M r Of fO W r W N m m 4 W W r 4)N— M M Y(6 10 (001)00 0 (6 r N m O r W 0) 0' 0 0 m M 01 0 N-N m 6 M m N O C D O M,A m a ma N O 00 m N M f[m1! m m f h V t Qp h m W 0 0, 664.-6 ,4,O O W m 0 h r O G rp f W I0 N f.0[I.f[1 0 0 m tt pp.f p. f.f�pp.A r h A m W W 0 M Y m m m W W m mmm m M m W W W M M 0 0 m 00000 W W W W W 0 0 m m W W W W W W M M W W w W W W W W 6 6,6 0 0 0 0 m m m mmm m m m m W mmm m W m mmm m m m m WWWWW WIZ W,..0 m 4(64 m W N,m m O W 6 m O O N 6 m 4 M O(6 0 Q m M N M W N m m 0 m,N 4(6 m,M m m m o N,O NN—N m0,64 VAW(6 WNN 6M 4W6m6 NN604 N0 -00 6060 NO(6NN N4O0(6 0 rfofovio rMcic4c4mac f+i ads i heir Maimind noififrifi 64. 66 ciMn ci 'v vir of •nifcad� F 064.-6 YN0 W 6N yam W.-6 mm W e- NMMYY QYYQ4 NN,.- 000 W W W mmm W 0.0.0 00.- W,W"° 00000 00000 0WWmm 00000 00000 00000 00000 00000 mmmmm mmmmm 00000 Or 0mI Wm Wm V0r O Wr0m ,WWv N0400 , MN0rV W�OO.4f` mom.. WW ,,M V14 V (6N-0 m<W M�M W m W W W W 6N (6 6 6600046 NWmWWO • ai ni W MM+ NNNN NNNNN CNNNN NNNNN NNN,, NNNM M4Y4 • 100)0)0) V` 4.-M m WA O M A M W(6 O N 6 6 6 O N(66 M N W O.M, O m 6 4 m 6 m Q A M 6 M 4 N.-COMM ma-q.17. C 4(6(6Q a e m 4, Y 4(6 M m 6 .p A m m(6 (6 m 7 f n 4 M MOO m m M O m m r 4 C o r 1 n (6 r N O N t A(6N(6 f[1 7 t h f[1 Y 7 4 7 6 7 0 mmmmm mmn.mm .Qn.Qo.mmm 4606400 smmnmQnm ArWAOm WWWWW 000MM WWWWW WWWWW WWWWW mmmmm Ord 0.W W 0.0 N 6 W WWW m O m N,m 4�N 6 Y M O O V W ,6 0 4 6 ,,WW, (6 m(6M 4 ...VM W A W,W N N O N p 6 4 N.- 6 W(6O O O,m M NNW.- N O 6,e m m m M M ,,,MM NOON., m 4 W m M VN 6 m O Q m M A m m N 46,,;c6.-N M46.6 N M(6m r W O M M m r m fi fo 4 (6 M M m 6 6.64,6r: m O N<(6 6016.-6 4 M M N N-O O W W m m 4 4) (6 6 W M m W N(66 N m 4 6 0 Y 6 O 6 m W M m W N(6m a A*4 A 0 M r O M m W N 6 W N NMY(6 0 6 6 W W O.,NMV ,VV.. 0 mmm' ,,WWW W W W N N N O,, N N M M Q Y Q(6 ..WWW 6 6 r r m 00000 0000 NNNN NNNN NNNN N NNN N ('(('(04N N CJ W N 8 c OOI 8 L 0 III 111 0 a° nRZE a n w �M :1'1, a J mm 7:4.144 V<7777'7 '77 N A° 22.9-81: � p 22.`04' m r m E E '" . amiM R„nM chi mi N 0'0 00 nnn 0 N N N d O o P g m m v N. � n m d O W 0 0 0 0 0 V<4 Q< O< m m m m m m m 14 '-',91,'44 4.,'° n tE C� 'v ai p N N 22 2 EEEEE EE Jg mvarin1. mo O. duicio ,c, T aaaaaaa�mm m m mmmm 0 mromm11,.4om W = a mmY2z, 2 'RWmmm W mm2 m m m m m m m P 4 4 4 4 Q 4 4 m mm 22222 yy m Z' .<oY vo xoo0 Q 'ooN r-o ao w v o 40; m m V 666 't z u m _ a O 000 mq mmKF �mm a.ca 3Z,Ougw a De m0amm o ~Tj OK+ Cm &g mer »LLJLLooLL 00 iii $ �N2Nm , O- o U nnngn a- a = 6".2 va I. '""'00000^^ 000 a G Ha,5 gt ii0oou+�n.; .c7n 4 Ngo E aide vv6w�c --r-m 4 i in n rE ti n 9 WA ~ a WA c Zuimm yyN O C m hi'r 7,"47%-27; m m � s dm n m n o §t yO + Wmm onov .6r• mSG�GG' m <g , mm 3 ' .� O S ' .\ i gr VA7 om d N "2= "' c x00000 c W m �E Od f NwIwI J 6i7I fn Hill 0 1'S.”, Tits Ya` W m mm2 mm �g p G44444dQ 4`� j] . t C d ..z› 0= e ary 0 !t-, 8 0 0�m NEv 64 o 0m,d ^ oui = . mm g 21 ap rm0m O w244O1Nm 0 A n g2 .000 0 z2'n494]. m 00jE Qo000 Nm NE 42,22200) mm LL id" ddd,md zz8 S mm';, 7 NN Nil717 w O N Q7 m LLP N W W On .mN•. O LL LL C . Vm m� iD W O r. w-'-rr.- - - , 2mdd nm 00 m a' oa y 0 is_._, a m LLLLI,i. K mm 11 Q 4 ..'.'-'2,mv U E .m .4 c.. Avrm n x 22:;22 N°rm o gN C _ Co a' E N o e 4 IL O ),>. C EE o V FO 44 110 III 0 d^.-.-•-mm ^ mai ^Oro^ rWOO w <w.- to pp y, oNto,,w N of M X0001010 NNO)1010 COCO.-0 V rMr,-V mMN W N e WWWWW 40,-0,1040 ur.VVM VVN,6 Na40M.- m06)MMO , MMVO. TS 0 6 NNNNN NNNNN NNNNN N N N.-.- O WWW W rr rf00 V V MMMN N a C 000 0000 0 00000 O0 00000 O4 666" 6 ¢ VVV4.44444.4.444444444 a° d;rrr M 0FNr4. MN-4.A 00000 m O0N0 Mw N^N NM.-N 4.6610 O V�MMM.M m01.-Og 1,v0iNO6 r10 W tOO M•- O N W.M W 0,0 410004404100 two 01....-CON mM r 1.-1,-,,, r r,r 10 0000. 10 10 10 10- w^M V 10 m 10 r m w ,N M v 10 0 Ih 10 6 O NNNN NNNN. MMMMM MMMMM mmmmm mmmmm mmmmm comm.. m mmmm mmmmm mmmmm mmmmm mmmmm N ..... ..... ..... ..... .MMM. ..... ..... MMMMM M N OOOOO ^0000 aaaaa 00000 00000 OOOOO 00000 6r000 ci r N N a^ m106rM ommoarrm0N ,0m. raolmNmmCNOom cocecuO, 10.- 0 tn.-arra mtncm . .- 1.4.7. 4.1 r^ 0 6 6 0 0 154'4.74 66"6 6" CO666 "6.-6 10 N r M V0MMMMMM«aVVVVVVVVV MMMMMM :74444MM MMMMM M < V MMMMM MMMMM MMMMM MMMMM MMMMM MMMMM MMM WWWWW 00000 00000 00000 0001010 WWWWW 00000 00000 0 0,-.000V, 00000 10.-rrM M A V .-.-WNW m W 0 m 10m O N m w N W N N C COV 4 V M M 00,00 M M m O m N o 0^ N V O m O W AOM m V1-0,40 Y MM N N Z▪ra mMMMM comO V CON r.444-44 OvvMMMMMV v6cocor rAcommwmW00 N M NN NNNNN N WWWWW WWWWW WWWWW WWWWW WWWWW WWWWW WWWWW WWWWW m rrrrr ArrrA AAAAA rrr Arrrr rrrrr rrr r .00.0 100.10. u6)uw)uw)u6)uw) 0100.10uMMOMM w)uw)uw)uw)uw) uw).u6)uwi. 0.0.. ...0. 0 m^<00‘0 v 6 10 coo, m r m 4 106 6 10 4 10 o r ,l,10.4.0 ^0 m M N m V 6 r M V 6 J6OOVN MOOMN 000MN O 4^Vo. 606040 On6N10 r Nm mmOMM o O O dada C C 0 0 0 C C a C O 6.66.- 0« •-66m6 66.-M.- ^0 0 0 0 O -0 0 0 6 0 M N o M 6 m A 6 m 6 Nor A M 6 A A w M w ,-WW.-0, W 10 6 r w r 0 A O 7 N O V M N 0 10 10 V 4 0 r 10 M M N N V h M 0 0 N 6 0 V V ,,7.0. O 00004 77779 7OrNNN N N0.-w 000100 a•-6aM ,,,- 4U^m rNmM 6 rM V 66 10 00- W W O M 00.-.-N N m^0 0 0 m.- O w O w N.-W4O m N N O M.- w N O w w N m M V 10 m 6 10 m 10 0000.- ^ ¢ Z_000000 011000 ^0100 0NVOm NM0VN NNVr10 0Nw0V NO0010 w 0000 aaaa.- c�icig4.4 ui100,i0 6466 a c.i66 6 aD6666 r4aoci t$' H N N N M M V V V.010.0 m r A r m ni M �j E ¢ o `o f m 10 L' i Z t . . ''' c o;ooo 00 ,-,...0.4,-. m 00 N M mc000 0.-Or 00-00 0 4 0N 0 m 0MN V o O 4N`o0oNr 7M46 6M000 m.r mama. 0-0 N0,0 00010110 4 20d2WqC 10m aaaaa 6M466 10arNw MO4mN 6.--610 0Mwm .-66.-66.-66 64660 r01 600^ NNCVV %UGOam M 10 .-Z,-.0 v O E^ Pc10o Mmo Zc" 02 U 0 mo=E o m M d - d ` oWoo^zdoa(1oo Q2od0.-o69210rmdmif o, 00 0 0 0 N mm6MV 10,6 6 4 OMOM4 NNWM WWO wmNNO 010.-001 0.-0 01 w O m.-000N, O00.m ONVO 00^rN V6mm N,..000, VN 0110 OmMor 4. O < 00000 .--.-.- 46 Or6 CO .- O.-666 60-0r MaN.-r OA44mN 01000- COMM 00.-01N MVV. 6 t r Zw C w j O O 2.0 `O C E O y F 9 D C. 9 5 c E 0 w ^ v CD o.5. 22 °v w °' ° 7711, 00 o =2 o W O C d LL O r C d C Z ` 0 0 0 0 0 M N 40 M 00 N O 0 w N O N r CO O N N O .-0.-00 .-010.-01 101001..r 0 d ✓ O O O U'«=W C d CC LA'-'" ;; X000^r O^NO V MN010m 4 V Igor 0MMNN 4NM,-,- 106104.4. ',,i,', 10%, ,10o10 o 0 m...« C j d Z.,d°d 00 y 4. 2 V m 00000 ^0 0.-NN N NN V-6 0 CO 0Nh 0-0010 r;m'm NNm M N L J N m d d W > ° W� d > ' ' ' , CO 6 4 10 10 10 10 10- -0 0 6 6 O O��N "O 0 d 41uKK?cU' Z` c.2 cLVUU CL Z Z'2 o o O 6 ° 6- 6 0 0 d 01 J d d d@ o d o 0 0 o w m»��c���c���g�zG�J O 001000 60000 100--0 100600 wmN�r OwN�V VVCOr NN > 001,0101 NNN^ 0 0.-.-.-04. 6 6 m N 6 4 0 10 6 M m 6^M 00,00 O) N f 66666 60666 66666 66644 MN•-6.- C66 M a6N 6.-6 ac6r�10 6 O O .-.1- M m co^M 10 m O M 10 m 0 N 10 A 0 N V ^N M V 10 m r 000006^10 0, 00000 O^.-^.- N NNN M M M M V V V �� NNN NNNNN NNNNN NNNNN N M 71 Q . ..... 10100100 460101. r Mr004 104-106 006001.4,4-0V 0 W 40 4-m 10.-MM MMMMM MMMMM M MNOV601.4,4-0Vm O r V 010.-100 V r 0010 m Am6O O 66666 aaaaa aaaaa www aaa6 --6610 046Mao 66(6 Mr646 4 > 10 N N V'' N.Q x[4)440 !toll!,l!,4 N c143 S ^ 04)66 NNMN' Q106 NN g42.9 -12g N N N ..... ..... N NNNNN NNNNN q ,7=,,T2 0tOlt .-00.8 0'"'000. 0 0160 M^ MO0Mm MN N 600- 1.-MMM10 10•-M r r 100 V M 0 ^.*''.� 2'-0 0 0 W M 0 r r 10 O V V 10 0 M 0N-6 V m 0 N 6 m N m 10 V m 4 V 01 10 .00010 r IMM 10 N A 00060 06606 COO COO -0011000 0-10 NO 00000 0--MM 44644 4 • 41 6 N 4 NN NMO V.00 N^ 410000 4.044.0) 100101010 01010 010 .° ¢ 06*.? E a ¢ >>m O O N a>W M d� o to m_ y9ar ^oOOMo mvNMo 00 10^1000 ,WMmr WW0M10 Owmr .WW0V m N 7 10dPw -000MM Mm roh�gN 0101001.- rr6NW 0104610 NVrVm NMVm10 W 0 Y 4.j`r. O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 6 6 6 (16r.:666 0 0. N M M M 4 4 66666 N 01 m m N z W 10 . a' `- ^ o o- 8 2. ¢ 4. N • m O N¢ mMr 0 ^10 2OaOm ` O2..p .ac momz .066mam¢ uLLvZZCN psoonoo 0000 00000 NNNNN 0000 00000 00000 00000 0 �'�,ON NN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN N 66666 10 m m m N 66666 6 01 0 6 6 666,66 M 6 Om66666 oCO M 6 V 6 O p 6 10Vm 510 C -N M410mr - vmm' 0000 NNNNM M4. MVV 0 co ,-NNN NNNNN NNNNN NNNNN N N d (0 O 0 IC c C) W c c> $` mi t Od=2tVt N C O U_ 111 yi w 2 8 C L O LL. '1 - q U g p �' 3 2 0@ A c c?w 4. c O c c ..9.. C i! T T S W W y y� @a d $- o N 2 2 o g i g 0•c o pEp R 0U.CC 10<Ow FU J JUC7> U 0 110 pp N Oa0�O1r�� 0 V OMiN ..000NNOMOV W � r O V d•-00,00 MM .NWVO 6WWOn0 70 mV0NO00MmNMOM NmOM MmQA0NMMVnoNWoo . 1-05.05. OWrNm,OA ' ONnM W0V V D...V YWW d 0000 00000 0.000WWaa0 00mrM0dWnrNr ,AA0W0p0QWmr0NO mC 00 WWWww Wqw 00 00000 0... mmo m..mM h0 00D 0.. p. OOOO WWWWW .WWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W J 0666mm 6600 60006 0600m 0000 6mmm6 06666 00000 00006 6660m 06666 66666 m 0006 6 6 6 V6CD D06 ODOD D MMD D D O DD D DD D mm 0000 MODD D O D DD DMCO VD VDmV O aa QdQQQ QeQeQ QYYeY Yd4YY YdQQQ QQQQC eeQee ddYtQ YtYdY VVVYdYV Q 11111 11111 11111 11111 to4oe ileet 111 . 1 11111 1 W e M N 0 m 0 A 0 O.W N WOW N M._�0mp._W .0.0. tp 0 0 0 d ,V00. N Y M N m totpp 0 0-6 d M W m M 0 0 Q A A N O 3—O,-N CM) 1[1 Odo .qM OfoD W.0O V DM VO,M 0,-0,0 .003,M NN M V 1M0 100(0(000 ,0M0 W NM 0 W NA, fO MACM7 N to e.-0010 ,MO•-0,-NM M d N C7 Y m 0,0300 N N M Y 0 N M.0)(DN M m r m 0 NM m A W M m n W M m r W M m 6 0 N Q r W N Q r w N Q ,OM.. e n O M m f0 Q Q Q Q Q Q Q Q 0 m m 0 0 0 0 0 0 0 0 0 0 1 r r r 0 J 0 0 0 6 6 0000. 0 0 0 0, N N N M M M Y Y d Q 0 0 0 0 0 0 WWWW VVVVV VVVV VVVV< VVVV VVVVV VVYY YYaPPQ o<vvV VVVVV NdddVaVVV aa'VV VYYVaPQV o77- MMMMM MMMMM l+ + eMMMM MMMMM MMMMM MMMM MMM MMMMM MMMMM MMMMM MMMMM 66666 00000 66666 00000 66666 OOOOO 66666 00006 66666 00000 66666 OOOoo W nnnn n.nnn N N 0=0,0M 0 0 0 0 0 N.M.. m 0 0 Y 0 d m m '0 0 N W ,00M. O O m 6 0 0 0 m r r 0 M m m r 0 0 0 M N WON.. A 6 0 m M M0!-m N00W 6mANO 0000Q nmm0 60dY0 0M6M6 M „cvmmo 066M4 444m6 64666 MO4 NO,-h O W007,7 0NM0O nNMMO mMNMN 0010m1dd000O6nrA rrr OroMNMm W00OWW0W 00000 w mmmmm mmmmm mmmmm MMMMM MMMMM OO0 M MMM M MMMMM M MMM M M MMM M M MMM M MMMMM MMMMM M MMM M M MMM M M 0000 00000 0000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 0 00M01,.- 0 m N m Q ,-0,-010 V0.003 OM,-Y0 Q A W 0 0 Y O Y 0 Y n d 0 W M m r M m W r m w O M Q e C g N M M m n .-d o O N Y n M 000.. N W W O N C0 7 0 Q Q W m M 7 m Y 0 0 M W m m V 6 0 m N r- M 0 r-0 Q M Y n 7 m M ,-W W m r m L,Q 6 0 0 6466 n n W M N N 6 0 m O e 0 m 0 o M W 0 M O !JPJ NN N M M Q .6 6 0a p 0 m.mm 0000 WWWWW WW666 60606O! 11OiMM M M T O1 W On)W W W W wW W MMm m m m m mmm 0 0 mmm m W�06m r N.M.. dp O,-d Q 60NM 030,1-m- 0600 M 0000 0,003v-e.. NY.-N O 00d W r N.,-00 ▪o Q 0 e 0 M 0 0 M N 0 m e W 0 W M W 0 4,-464 Y Q e?r m Q 0 6 0 0 O N m W O M m M W M m m N N r O M m 0 Q A aV N ..CONN N 0 0 00000 00000 O':SON ��N r-N NNNNM �-�.-M N M NNQ Q N MM N� m-N4-MN NNNNN NM MM d M NNM N • NOGG G 3 0 0 0 0 d W W p 0 M r N 6 6 M Q N m W W O 0 0 m W 0 m O W M 6 A 0 0 N A 0 Q M 0 A '0 n N 0 6 2 0 0 m 0 M N W 0 W 0 N6 Q OIiQ 4 W 0010 N W 0n6m O nmm m rni mrr O NmNN A 0Y Ym r�0 MNNMm r m6N W 000 Q W m N W m N 4Oh. rood •W �-�- V ... 4 N M M OO0 OG NQ6 W; Y N 66664 00300. MQQ 00rr, W6;66 01-0NVN0300 NMV m0,60 aNMdm mmWO N000 WONMG NNNNN NNNN NNNNM MMMMM MMMMY QdQQ Q Q Q m 0 m mmm m 0 0 0 0 m 0 0 r r r c. 4YCW7 M V 8,7);!22' 8,7A 0' g28EN ONAO nO fA V 0 0' 228,22 m O,W0 5:gig2 N 2°221? 2 2 W O 00 70 N< NO0S2 Q Q0A 2 m V O nM 64 pN MV O . ONrOmMYd0f0 • 0•-NYV0, 66 6666 N0000 NNOI Vf . mOOO N Q 0 M . 003 MON-NM 0m WO M 7 NNNNN NNNNN NNNNM MMMM MMM MYYdd dQQYQ QmmmmV % E E`&001m mr0010 60m0r0 4'823-3 'ONN O2400 W•m V MmMOON NOmm mW ANMp[1 SZf1 m1'2g<`42;-4S9 <`4 0 0 0 CWo00NM 0C00NNNMpp ma � M , 00�N7 NO1-NY0,AppNV ,N0VWO, C7Y OION --.. V0,030 . ON00.0 V 0NNNNN NNNNN NMMMM 7M MQQQQ QeQem m00rr 0rrr6 ...WW O a MQNM 0m0NQ 0OMM rMAMr QMMQm DOY On 6NmWM Q Q 700 .0w0N- M6m00 dY00d,-W010 mOnnW NnMNM rdMm NO 4o4 4 c bei Oi tp O4Mni 4 t CD C Mr C )•G46 N 6 6 0 W 0 NOD N G D 6 OONNNNNNNNNNNNMMMMMeVVVVOVMNnN0M 0AnOOdWOo0NNNMM MMMd m .0700 mWNnr N030003030; C J a W 00 W=o0,N W V m O N0 mO1 OM A0 0 0 N- 000%-00 NN-O 0 0 0 MV 6 N DC MN NACC 0N0MV00OhN6N0(0)0. NONN0 C MD 0N00 0 8 d0. .- dW 0QNNM 06MOA QNOinN M,-OWm 66w .NM.iD ONY0 YoN 60664 W = "" 060WO ONNM VV... rmmWO MMMQ m0Nm0 FNMYm npONOM0tONA2' VV NNNNN NNNNN NNNNM MMM7 mPVVV. m mmmN mom CO d ~ 0 r ON 044.-4 W NdM- N0NwM N AMm0A ION W 0 MOO V m ..1..01)W,0000, OWO . o0 0Q,NN- NM . 0VNDCD MWWD N0. 1- C 6 0 rV0000 W00pN00ut -p00N, OM CD M66.66 rW0NrpM� W01M0NOON ON. , ao- 0N M N NNN VV.. 00000 06rAA NN00NWOWO 0000 NN NNMM MMD*CD QYdm0 MMMMM0.AAnnnm m NNNN NNNNN NNNNN NNN NNNN MMMMM MMMMM MMMMM MMMMM MMMMM DCC MMMM 100 M MMM M M 6 O N N N N N N N WqO 0 W ...VM d W M d CN7 VOW.. N Y N m N O m Y O Y O r N M Q ..00, 0 0 Q W A m N m W d 0 r r m W O N 0 m p O W M 0 0.0001 A M 6 N Y ...V° m W W r Y W N N W Q m 0 Q 0 e 6 O N Y 0 QOM.. 000 Y ON DO d.i6 NQ 0 64,:666 0 Mcdr- .Q � OM00 66, 64 66,...:66 66666 666,.:6 Y NOm 0 M O6 mN W M m 6 A 0 N N Q n W Y 0 W 0 6 O M 0 r O N Q o w,-M m A O N d 0 m O N Y m ~ m O N d 0 o O N Q o 6 O N M. O O N Y NNN NNNNNNMM MMMMMMNMNMVNM00MMMMmM MMMMN NNNNN NNNNN NNNNN NM MMMMM MM M7 mM 77 M N O^N O v-M W.n Q m e r m n 0 d M N M m 6 M O 6 0 N-0 ,1 W O W 1AN o e 0�-W Y m 0.00, .N0003 Orr W r 6 0'0,-Y 0 n M O Y m r Q 0 00000 w g 0 0 VOW.. W n M 6 2 0 0.0M0 m N 0 6 N 0 0 0 O 00000 O F. 4444 E n n 4 4 4 M 7 MMS ooo66666 V V V V V V V V V VV aDaDON MM4M6 . nn444cdMMnnn44 444 444444 n 444 4 n.mmm mmm m0m0m [Nmmm YYmm mmmmm mmm mmmmm 00 mmmmm mmmm Y"'A O N n O W 0 0 W a Mee nN 0 W O M N N W 0(0,00 m N W O W010,-M. 00,030 W W M o M r W r N r o N e 0 0 6 0 n N C 6 0 0 0 N N d 0 0 r 0 Y 0 N- .0.0. N 0 M 6 !0 w N m Y n r 0 M m O M o N O 6 M W o N-A 0 0 0 0 O o 0 N O m 0 2 0 0 e mm06 60000 00000 nm6WW NNN MM 00mrr 6wWON NMQmm 00000 0 NNNNN NNNNN NNNNN NMMMM M MMM M M MMM M M M M Y Y Q d d Q Y a Q d a Q e _N N N NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN00000 NNNNNNNNN 02N N NNNNNN 6666 00000 DCD000 M6666 00000 66.i00 00000 66666 00000 M6666 00000 66,666 06060 m NMN. NNNNN 000 WWWWom 000000 � .'NNNN MNMM< VVVVIn Mwmdo mp Mlr,)arllr,lar,! WWWW0 M)181rn0d0 0 C) NNNN N NNNNN N N N M M M MMM M Ch M M M M M M M Mtn M M M M M M M M M Q Q Q �j C,) 0) N N C) 0 D C U 0 111 �0pp �0pp �0pp tp ttpp fp V LON.0 w�MflM Me-m,N CON�6m V 0m0e- W.N.M W,We-OM dN W re-M.0 rmMO V 0.0MOM OMOW0e-0N W ONNO o O1 r M W m m O^M .WON. r O M M m O N d m 02 r Q r W N .w M m N m O d m M .d W d W d W d W M r N r N r N A M W d 02 6 0 0 0 d d N O W m e M r 6 Q N O m r 4 M r M W.d N r w r.d N O W r m V.M.-003 f p N NMN O T m W d M O.r. d N t^p W m m.d N r W O W r m.dMr 00.x00 NMMM[021 NNNNN NNNwm AmQMN O W OO OOOOO Nm NOAOOl% CWD W 00IaM0 mm2 NN P a 2n 6 d d d d d d d d M M M e WW6W w666w WwwW6 ww6ww WWWWW .m... mmmmm ...m. wwwww TmTWm mmmmm comm.. mmmmm . m m m m m m m m m m m m m m m m m m m m m m..m W 6 m. .m m m m .mm.. 4444. ..... m m m m m ....co co . D e 4 4 v 4 V V V V V44444 m 0 6...6 66666 ..... Q d444 d00Vd 0dd40 00*00 0000Vddd0d d0V000000d..d00000 V^N N r d OM O Q r O W Q N r 020.001 m COM r d m r W N ,,MVV O A N M d m m r Qd r M m MVO.. G 9LdMpMNOW� MmW 0 pN0.00. me-003. NGN! AWNp 'ne0N�WN00AMNrr0. OW r. MMOO AYN020M . WV OO . . W 02 6V 0M00N drOMm Wrdr0 N.mrd mWNdr OM6Wr M.0 rd N.WO M.W r M .W r d m We-V17..0 N W .A A r m.m W w 00000 O r r r N N N N M M M M d d d WM... m m m r A ,,WWW w w W W 0 000e-e- r r N N N N MMM M d9 mom. WWWWWWWOOOOpNoTOMOOo OOOOO 60000 OMMMhOo00o OOoOr dddd ddddd dd... . NMMMM MMMMM MMMMM MMMMM ..MMM MMMMM MMMMM M MMM M M MMM M M MMM M M MMM M M MMM M M MMM M M dodo 66666 ddddd 60060 00000 00000 00000 00000 00060 00000 00000 00000' 60000 o N rCU*M or Quo ^000N 0* C)N 0r r dM 000.00 m02ee-0 0 0N00 M,0. NM0010 44... m666d 444.. m m m m m m..d M N N N r N N 'EW TC)N V umi r CDT V COY YAIA 000 N V 2100000 N V lr0 000C)0 000C)N 00. NW. 0 NCm�2N00 0O0ON M N 0002O 00.N. M 0 WNmN 0 W`O O r r r r N NNN N N N M M M M M M d d d d d d d 0 6 6 6 6 ...m W w o o.. r AAA A A r m m W 22.'1;28 W W W.W w W .comm .comm. ...ow mmmmm ..mom mmmmm mmmmm m.m.w mmmmm mmmmm mmmmm mmmmm mmmmm m MMMM MMMMM 00000 00000 ..MMM 00000 00000 MMM.. 00M0M MMMMM MMMMM 00000 MMMMM M .comm mmmmm 00000 mmmmm mmmmm 00000 mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm mmmmm m W^N m W r m A w 0 6 ^O A r d 6 A M A w W M N r NON m.00302 0 A r N m m Q r M m r r m m r m Q N m O M O N OWN O 000N, d C W.M r W d r W. N 0 M ..MOM O 009 r N r r.W N 0 m W 00rNN Ne-00103 r.d N r O m r 0 M O r M O r d'-m.N 2c - C) 6466g r.:,:6066 ,- MV N N44466 000NNM.. ...MM 66666 6.. mMONMVh6r.6064444 N dV hmm C` rA06^rm ONC0MW0 pp0 rM CNM Q. Q0 WWWWW W..6 0WW60 wwww0 00000 OOOOr NNNNN NNNMNMMM .WWW WWWWN WWWWW WWWWW WWmWW WNmmW WWWww wwwww wwwww WwwWw wwwww wwwww wWw Z A r r r rrrrr r r r A r A r A r r r r r r r rrrrr rrrrr r r r 0 A A r r A r A A A A A r r A r A r r r A r rrrrr r 4444 00000 ] MMM hh 00000 00000 NNMTT NTT.N hW]Nhh HNNTT hhhhh hhhh h 00000 00000 T W m W m N M O A m N O r A w N A. M A m w 8"'"' M m N m r N d O W M N m Q r 6 m N ''''M .M M M W O O^ 00.0c). 0 T M O w M N r Oh d m d O O O O O m M N O d m M.M N. r d m M O m 6 r f0 6 O O O r N.M d d d.mrd O m r N r m N d d d �O O O O O 0 0 6 0 r 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r O r O r X 0 0 0 0 r 0 0'-O ^0 0 0 0 0 0 0 0 0 O O O r 0 0 0 0 0 0 00000 O d m 6 N w r m r O r N O A d w 6 r w w O r M 6 r d w m N l m.r W d W m M d w rem M m m m A w N MMM W d 6.M M m r A. d W d W M m d W d W d m N r N W d m W d r W O N M d m m O N d. 0)m W O N M 6 m. O .00.0c40.-ma .OId r.-moo OiCI Old CONIN.�0G d 00010 r 0d,W0 rmOQ a0 t71�r N N V.,W 0Nm 6 m.W r N d 0 r ..e-NV 00000 0 0 0 0 NV.,. O r M d m r m O r M d mrm O el M 4 Y)M 000e-MV 6 r m O r 0 0.r m 0e-NV. r r r r 00000 00000 W W W O O 0000 0 r r r r r r r N N N N N N NM M�Mp M M M M d d d d e d d.. 4444. 000000 m^.e Nm r w.wm MNM r. 0i 20000 N 4000 CM00 0,VMO N Cm0A0. M aT Al N V OONM 020,020,- OOWON W Mr rN M ,02020M 000 NOM) MCMONrN r 2=-4-(NrM .05x0. WN.WO r . 4 00 0D r O m N MV 00 N mA000 05 .-6666 p 0 0T pp A DTONM 'N N o mNO1mM 0002ONM 00A NM N0A002 00NMd 000050 DW ... M.... W. mm ...W. WWWWW00000 0000000O0 r rr M N V V O WmamN.O, NOm MWe-SSW 0pp m ONrNd. dm W N W NOM NON1�M dOMm�NNWW imp�C0')'Ol�d 0 QD „ooo °OpV M. mamr0 comm. *.r N . Mr .dNO OmeNO W .0050r 666 wmQ 46.6 ONdr. O M.rw Nd00 O �WOe-NNNN MV Nlm006r0Nr Wp 000a U wwww OOOGG rNNMMM MMd VVVN. MN0000rADWW 002w 0202000 N N N N Q M W M N .M r N W m..d W N d d d r .r W 0 N m N N. W d m.W r m N d.r W 00e-.02, .N d O N W d 0. N N M r d N O m.-M M d d M M N N O W.d N 02 A d r W 6 M Ord N W M W.O V.N.W N.W N d 0,0020 M d.A O O N M d d MMM N N NNN M d 161.6. r 011 2CI M O.m« 6.661, v 0WWO0000NQmm NMMMM VVVM6..mm Ondnn� W0M 00 ,02e-MV 0NNNN MMdVV .U00001WWW MW2. TO C l0 m 0....e-VW. . a�A 0e-NO, 000 .640 0.-WN10.005mN004 rTTd00Nm VM TNV... r 000N0MmV0. 0106 .464W dANfDON<M N*60 taO W N.rmO 66466 rrm0. NmrN0 WMr . Om10 ANWn W0020a000OrVVm NNNNMMMCOP.-Mg N0./N 6lmWwW 00000)000 0rr MMM Md4 . 00006 ` ~ ,0MveM0We-,0, Vl W.N. V ,M0 WNW.. NWrMW W WN0N V W W 0M00W0.0020 V W00000205.jvr .W00 WOM eOrDO1 .e- VON.0 VO,aNW00a 0a05V , NV Te-005050p05V0,pe- M0 {p 0 .MTOpN< AW6NNWM VW em.T 000l Ve- 0. 0000 .100 NQ0,01 O . OrAr WWWW 0102020202 M V V V V r N N N V VN M M M M M Q e Q d d e. m m m m m V V V V VV W 6 W MMMM MMMMM Vddddddddd eea ddddd ddddd 444dd dddddVVVVV ddd V V . 0 0 0 6 m 0 A 6 r 0 N r N .m M W N M 6 W r A 0 r 02 0 W A d d 6 T M d A r .l 6 r M 000. r r M r W 6 N 0 6 0 r 0 A =M N.. N m 0 d W .O.N. d O r M 0 m N m.r N O O W W CO co 0 0 o r r O N V m m o N 4.030n 1G W M r r d r r d m O2 O fU V W 6(6.-66 6.-666 .-664m 6,:vri o r.Mr W rdNO m .6 MrOi A6MN0 DO(O dMr W r6d N O LOAN d N O W A. M ,,WW cmiMMMM MMMMV vevva ddddd dvaaV eaaVe vv44Z 54444 44444 4��VV VVVVV vaavV V 0 s O..M O o W d N O W.. 0 r W d r W4W M. W O Mr 4r 0,0 0 0 d r W N Oui m M O N N dr r d NN 6 W 6N N N NNMdM. .0000 .rNrr Ww0Or NMMdd MCVMd ddddd WOO,. 00000 0000e- MMMNr N ~ dNNhn00NQ 4404 4 40.. NNv .0 6.... .6.66 M6 6 M . 0mmepph600W. m 4 4 y^W w A rn W m O.N N r N N M r ... r W W. m.N N M .dor O.W r d 2-Ne-Me- r N N M tn.-10V. W m r. W r W 0 N N N r C N r r W m W W Q Q M N N O O N e-N O r w m d r r M O r w w w A W w A 6 N r M r M N M d Me-M00 CD.A m. cD m m O r O 6... 44444 .6666 6.... .6444 44444 ddMMM 6.6.. M MMM M M MMM M M M N N NNN N N N N M M 4444 QeeeQ 44444 QeQQd 44444 ddddd d d d d d d d d d d 44444 ddddd 44444 d d d d d 44444 d m=NNNNNNNN NNNNN NNNNN NNNNN NNNN NNNNN NNNN NNNN NNNNN NNNNN NNNN NNNNN NN NNNN O.O. O vid N d .6.6 6 06666 6 0 6 0 6 O.O.O 6 0.0 6 66666 o r r r 6 6O N O .660. 0.060 6 0 6 0 6 0 6 0.0 66666 We-VO WrdmW dmwr dmWrd *Ordm Wrem6 reT pW0 WNNN p p 02 Q<NN MMMMd ddd.. .rrrr YDm V000NMO00 00e6 0 O0) O dddd e Q Q Q .4-vets,. ddcodd dddddV*dd ** 44 44040 . 00020 (D 6 N U 0 E _ o U 411 110 p fp W MYM WOW0Na�M�S O'Wr� Wpp mY�W �O00� p N.-c-Voc ,6mN.-WmOLOMWTmO MWNOO , 66w,cC f .-16tOc-or m 3TVCWN WWWW NVWrr 0,,.f M WVWVT NIO 00WW VWWM OWWVN OCOTW WVWr0 VWMW a0OVMOOrf MOWWVWMOMOWOMWONWMMWWrmVMNWNMN° W N s- iaNO WCOO.aMMM rOVN MODD . VM.-005 , . N N .- h0000W ,,WWW WWWWW ...VV VVVV MMN N NNN N N ��� . X 0 0 0 0 0 0 0 0 COT O W W W W m mmm m W W W W W m mmm W W MCO W W COLO W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W M M W W W W W CO CO W CO W CO CO CO CO CO W CO W W CO CO CO CO CO W CO W W W CO W W W W W W CO CO CO W W CO W CO W CO CO CO CO CO W W W W CO W W W W 66666 W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W co W W W W W W 666 06 W c66 W W W W W W W W V V V f V V V f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f f v<1.444 V V V p V f V V V V f f f f f V co OM.N MO(DN W ,n�W O� m6.0. N0 W rW W ! !:! WOW CfD��aOppMCDMel,W N .- W f IW CANr VOWW W M 000OCNNMf f ,O MHhHNhNHNNMHMM M M MMM M MMM MMMM000 0006 66660000MW,0 W WMO W N n : r0 WOWNW A W N N ANT W M N 0 0.- NV W W W T O O M O V O,O N A .WON, W D f W N W( Arr nrrnr 6 O f W M WrMrr, nrrnr Nn hrNr,Nr W M W f Or WnNrWrfnOr 6o,646 W M W 6 r:66006 O.-r N W 66464 OM` cp00` M.WAW W NTONM WpW VVVmh00NWW mmnrrnrrWW 0,00N MfWoc,6600 � �nNNNNN NMNM M • MV VV nWWW m,, WWWCCOM r nnrrr nrrnr n MMMM M M M M M M M M M MMM M M MMM M M MMM M M MMM M M MMM M M MMM M M M M 2 M M MMM M M MMMM M W W W W W W W W W W W W W W m CO W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W T,"'N,-s-W ONWON OfTAM Os-WW. O W M 00 ON OV WOiTA CTWWfN 'OWrW 0MMM 00N0 s-10, WVM NNNMM 0s- NVWAW OCONW ralWO M _ Wm0666MV0mrco0NON C) f Mmr0s- MWNOOM� C00rmMOW r=r m 1.0,WMs-NMV. C,MCC.- NVmON MV.CO, NOC [ W MMMV faff WWWW000Ar ,,WWW WWWWW WMWTW WWWWW WWW00 WWWW WWW WWWWW WWWWW WWWWW WWWWW TW WWWWW WWWWW WWWWW OWWW WO W W W W W W T T O O r A r A r A r r r A A AAA A n r r n r r r r r r n r r n r A AAA A A AAA A r A r A r r r A r A r r A A ,,,WW W T MO O W W W W W 010,000) W W W W W W W W W W ..... M T W T W W W W W W W W W W W W W W W 00000 W W W W W W W W W W W W W W W H W W,0 ,0 h W N W ,0 W W N W W W W W,0 h W W,0 W W W h W W W W W ..... W W,0 N,0 W W W W W ...0. W W W W W W W W W W W 0)00.N,- CO WAW s- ..VM. W V 0 V M W N,0 0 A 0)0 W.-N W T W N WT W N f 6 0 0 M V T W N M A W N 0 W W W W W A A N W T J V W O V C)s-N M 606,-6 r W W N W V N O r W W h W N V N W V M r UO r U0 W M r W f M N r p W 0 0 W W r,0 V 0 )0)0U) co 00000.- 66060 0 N 0 0 0 O 0 O O O N O O O.- .-6666 .,0 6 6 6 'O N N N Q V M .-666,6 6 6,V N W N s-W N T M W.-V VV M W M O f r W ‘-0110,-M W M W 0 O W M N N W tp W r W N =c44,06 N W T M A N ANT W V N O O T 00.-NM W T N W O W NOW, W T N W N W T M W W M f W W A M W N h N comm, (6666 a wM rN rNr N W NANr N rN 06,6 6 a 6(O�r 666,-6 V 6A M6 6o466,- ,MOI OI t6 O N W V T W 6t6 A 0301,-N V W,W W 0 0,0 r W O M V W,0 0 N W W W .-M V W r W O N T W ,W O N CC W r W 0 N M W W 0, W WON M W r W 0 CO M WON, A AAA A 0)00 W W W W 0 W W W 0300300 00000 004 N N C')NMM MM M V V V V V p V V W W W 1010 W W W W NN 00000 N NNN N 00000 00000 N NNN N 00000 0 N NNN N 00000 N CO W N r W 0 0 0 N W n M .n W f W W W A W f W f f W N W W f f N W f W N W f M.- O W W f. W M N W. Q ZNWMW 0NWV0 WMTWV WWs-VW M,NWV OPrfNO W,.VM NNs-OW nWVMs- OW7{OW WWNOW WMO,W W 6rONOfNMV444 000WNWrTWWOrnMVC00ppO.- M00,-N MVOm .-- .W, mVhfVT,-N0V. O .00000 O^NNM MV.W, 0N NNN NNNNN NMMM MMMMM MMfff Vffff V.W. W W W W W 0)0000 000)00 r r A A A A A A A A ,,WWW W ry Q fry �p ttpp �tpp {p VWtM0 CD OMfO)N r0OW)VOr CWC "" tr•)W0 < W,OOI f NNNVO OW)NA', CWCOWW ACNC0 Sign Nm2O0 MNVfO mNtW)o< N6 : r: OM N ::::: 666 W r W ,n :: : C:,-OT06::::::: s-N00 :::::: W r W M h ,W s- W N f WO r W NNN N NNN N N NNN COCCIM M M W V Osf W f W W W W NW W A O r WV W M W W N W V OO W W W W aNO m(U NN66666 p aMN.- 66,:66 M W r vm WW.-M M O NVWW W.-MYn W.-MfW WO.-NM fWWO N00N 00NNNNNN NNNN NNNONNNNNNMMOMpMMM MNNNN 00000 0 N0 N0N00 N CO,N00 N CoM MMMMMN 3 (0 N (WNVWf..) M M W M W-T W W - W r W --W M W O r V N W W N W M Ws-f f s-0 M W M n V As-CO W M W h W M N NW W s-A W T NWWMA NrNTW VNOOT Cs! WNOW, WWN WNWW MWWUM VWTAM 0WN,0N CO W TM r oi66.6 466 r0r N(o r oia6 M 0 466•-r.: O _ 6 46r.:66 WO6646 W a0 660A M Wrrr, fW O pc000 0NNNNMNMMMVVOU)V,N- ON 0m( , ,, WO000 WO.-MV TWTOO 00NCCCC M VV ,VW hhb W W W j NN N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N N NNN N N 0=C4.0110 0W,N WW mH WW mH mW aW.- WW MW W OW MW W W W W H 0,0100 M,0 W rW MW W W W H N pW OWNVW W WpOD,0 MW NW N r0 h W<� WW WW CW O NO WNM CO.-C10, �oNf0A O , 00nor O ,ONMN , 0 VCDo0M F WWfN 6664N ON hNoi OMW ,- WVVMrWN ,mT� 6• D66Oom nooV (pTMOtOWm M (Oocm 466 WmW WWM 466,- T66 Mo OO NNNMM MMMMf ffVfV WWWWW worn, iANONWWWWW WWWWTWWWWO .WWWW W .,MOO WON V N 00M10,- W N f'-W °NOW, tV•),N),W, O W r V ,V M W W W W,W M O W,V rNM W O 000,0100 f W A O T W W M T W W N W W W W W A WNW T V N V V V W V T V M V O W N T W A.s M A M W W p~ O W W aW r M.-W W M 0rac-0 W W.-rM W WOW N r.:6666 M WmM W VT M O000 T.-NNWNM MMW'VVWMVmM0 ONYWWaCO tG,A ,a6a,W O.-MVO WMW mf mOWM VW AOOO00000 NMN AMMUaasy. 1pp0gW ppr , , WWWW COWO VVff NWW WNOW WNWNW W.W W W W,OWhW h W WH W W YIW W W W ~tE r,O V N,Om M W M N N WMT V foW rW W O W W W O M W G N rM O N .%"=“2" M W O f W N O V K, TWOW g r 0 m 00 "D''2 WNWNmhhNmhW((ppWWhWWN . NMM6N NNNh[ .666666666666NhmW6 OW0f 00OO ,0hMWW NWWN WWWNN 0m.hh ....co W 6M W 03 W,MN MOCO0 CO O W W N WCO TM TM OCOM, T, V „ CD V CON. V V TW VM03003 ONW MOTW W W 0WW W MONM WWOW , MM, T,0W OWrWW WVVN NVWW MWfN 0 00 00MM ffVV W0WWW WWW„ ,W,WW WTW00 06 66 06 T,W*W 0000 V VVV fVffV fVfff fffff fffNW WWNhW 0Wfff f f f f V V 2 NNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNOOO 00000 00000 O 6666 WOWO6 666.6 60 6 0 6 666.6 WOWO WO6OW 66666 00000 6.666 OOOOW 66666 0000 n W O 0 O 66666 VWW 00p00TNN W 0000000 0000Np0000 NO,NN0 rrrOmmWW 00)00NNn f ,000nrrr W0000 gN WW00 W00WW COW00 WWWWW WWW0W WWWW W0WWW 0WWWW WWWW WWWW, r 6 CO N) tri N 0 0 T c 0 C 0) 3 C) C 0 CO0 0 0 JCO „cow.. VNN0M to MmtsmMa 0Om ,0 V Y MNO 04 OOrO6OrN N 0 N WV� NO ,NmN. ,• MOim100MOWM NrC00MM 00,0 MMWO ,-,-NVOOMO OmNWO aWOm0 .6M,. nMrOO 6060OMN,O „0),M 6NQW o 0 VWV6 NOWNOWNmNO 0,0040, NOMM 00n6 NNMO 0,WOM mOOO wWWVM W6VW 0)6,-M4 V mmmmWmppa , . N '� 0 , 0mmQWVV < MNNNNOWW6, 6 WOOmcrrttow . CO,-00,M 00JOm , 0000 00,,00 VV0MMM N rrrr nnmm0 mmmmm (00006 mmmmm mmmmm 660 66666 (00000 0 g6mmm mmmmm mmmmm mmmmm 0m000 mmmmm mmmmm 0666 d(� m m m m m m m m m m mmmmm mmmmm comm00 0 6 Q 4 Q 4 44444 4 4 0 0 0 Q Q Q Q 4 44444 4VV44 4 Q 4 Q 4 44444 4 V V V V V VVVVVVVVVVVVVV ,4444 V m 11111 11111 11111 11111 11111 . 1111 .J_o^m 6 n O O m^m M too.-46 MO N N a m N O^,O 0000, m0Wr 00000 WON,m m O a O Vm 00000 m M m�OMM m OMOm10 1-008p OmAOaMMaNmm4v-WWVO WM,Oo 0 NW OWO0 ,,, M VW0),. t660V M 0,-VW 6^666 0006 r6000O ,00,0nnOMn M4,OM 60000 N6W.04 nWNOO MWO NNN NMMMM VVVVO mnm6W ONMQ 06, 0, 0,-MVV 00O6m WON6 4Or6W ^NMOm ,NMMV O• MMMM MMMMM MMMMM MMMMM 4V4444VV44 OOOOO OOOmO OO0) ,,WWW MMMMM p mOmm mmmmO NOOmO NOOOm mOmmMmmmM m0 MMMM MMMMM MMMMM MMmMM MMMMMMMMMMMMMmM mmmmMMMMM MMMMM MMMMM M M M M M t +I 6666 OCOOC 66666 OOGOO 66666 O n O O C 66666 00000 66666 OOOOO 66666 00000 O O O O O O f0) ,nrnr r a W^n N.-4 m N M Y r O 6 N V 6 V0000, 0,-01V,- w N V,- N m Q Q Q •-00100 N M 6 0 a .-6.6. 6 6 0 6 0 O O m m 6 O C WOOD MmWm6 mrr, 66W6co OMm 00 • w6WM6 O Om VO v-6m mrOMn„ .crneM MMa44 44666 4orM^ .6466 6.-o4v CMOO 646N ( 6664 OUNCf 6Wm1A W mor,.- 0nVN0 8MWON CONCONY 06600 60006 WW,-MQ 60606 00,-06 V O00 0000r N NMY06 m,mWW 01-,-NM OV4O,0 MOOOm mmm„ ,,WWW 6WWWW 00000W rrr 66666 Im7Om 66666 66666 WWW WWWW mWWW WWWWW WWWW WWWWW OOO00 ,o000VmMMM MMMMM MMMM 0000M 0MMMM MMMMM 00000 000MM MMMMM MMMM MMMMM aaaaa aaaaa mmm OmmmO 00000 0 m000 mmmmm 66 mmm66 06666 6 6 6 6 6 0 6 6 6 6 6 6 6 6 60 0^O 6 m 6 m m 6 N N r O O 6 Q 0.0M0 N 1-m 40,-00. 6 M O 6 N O m W M n (0•-•-.M 0,-M=0 00M0, C y 6 4,-0 ^4 m W M n r m O N M 0 6,0 N n n r 6 m W N M O CO t0)m M V )r^M n N M m,-M M r a W M M O M m,M O 0 O 4 W,N W t r n 6 6 R MN,-.00 WWm0W 6 M W V W M r M O 6 6 4 0 0 0 m 4 N N 0 6 O M M ..-66N 4 8000O- M4 mN0 460` O amN,W ONMO6 0000,0 O04W VCOMpO mMV00000 0NNMMV4O OO60, ,,WWW WWWWW N6MV4 w666 6 0)mO o O O O O O O O o O O o O O O O O o O O O O O O O O O O o O O O O O O0O O O comm. m mmm m comm.. mmmmm m mmm m m mmm m m mmm 6 m6 6 6 6 6 6 6 6 6 6 6 6 6 6 ...woo 66666 .6 6 6 6 6 00,00)0,00 ,W0 N 00000 (00(00)) 0000 Nh 00000)) 00,(0),00,W0))) 0(00(00 00000 00.00 (00000 00)000 0)0000 00000 (0 y E N N 0 0 4 Y W N,0 N W^N 6 N^n YNn N M (001,-0, 6 N^n O O N N m O M mmm m 0)6 O m W M n M m c0)O W W W m a M J r 4 r 4,n 0 0 W N N a a W M m O m 0 O 00 0 0 0 4 N W m M m m m(0 C) Y O n 6 6 N 6 M 6 N 6 M M N 0 m M M M 0 M M m G ONNN N ^<.-'-O O�.-NO 00000 0.-0.-0 MMMM M M N.-M 6 4.6.N .-N666NOGG 000 G^ 0 O .6666 666.-N CMN6 W 4 W 3 C O r cN 0 0 0 N n00.-60m r ^O N r O r m 6 0 W a N O m.- O M r m, O,M.-co 0 004 4 r n N O V W O 6 m r V W nr4 O mom., 6M6Mn 66,0 00000 nNMV 46MW0 4WrM0 ,OVm,-V C)N MOm0 OWM4N 6rMOm WW 00106 0106C66666 0646 64<-0 N4666 MMO .-0006 trio. 46461s: MoaN 666.. 0660 NVm60 mOaNW NMO6M mmO 6,010.- Y6WN4 OMO6 00060 6600 MMVO6 NNN NN MMMM W)V VVVaV VVVVV0VVV VaVVaaVVa0aVVaVVN NNN0N NNNNMMMM MMMCCVaaVV V rn Z.- MN ,mm 00,00N SOMOQOAPOn M n 00000, .-An mM NM Am.- ,-OMN M W 00M QOh 00nMCONW OO 00600 N0VO nNMMV WrO4 6^OW6 060rtp rvGr 0 0 6 6 6 6 CIC)a O00 4 N^W 6 4 N O O W 6 O N 6 4 1-,01 6 r M.-N M 6 M V O m 00 6 W W 0 .-Nmm. W N 6 W N 001000 6 M,,-VW N 6�O, 00,-M0 4 W V 6 M W M W M ,0,0 0 01 0 6, p�O N V m 6 6 6 6 6 6 6 6 0 00000 W O O O^ ^N N M M M Y 4 4 O O m O m m r r r, 1,0000 O O N N M M Q Q 00000 r0) ,n n VVVVVN N N N N NNN N N NNN N 010000 N NNN N N NNN N M MMM M M MMM M M MMM M M MM M M M gOnO m N O W 6 V 00000 O V r N 6 (0 hO W m,W m W Q WM6 0) 6 m M O to m.-W M 4 0)� nO -00Wm 6nOWN VMr06 00,000 OMW W m^N6N t ,om 00064 ^ 660 01006O 0,60N6 0460 QQN. O 6046N .gW6 . V 0 ,-(010,00 00y0,-(000M r06600 ' 0.000 .00VOV 80) OMG0 a 00(0NMMM QVQ40 0(00OnMa0108000 N0MM 008n0oV 0M ( ( MM MMMMM 0MMMM 4VVV4 44444 VVOO OOOO 0000 00 0mmmo O66 8 6 6 6 6 6 0 a O N r W 6 4 6 6 N O n N n m M 6 W O W V W 6 4^n^ 6 n W 6 m w W M N mor.-4 N Q W M m O Q m,4 6 M „W O 6 QO 6 cow .m M m W a O.-W O O m to m r N W W r W m m r m W m W O m N 0 ,001,0 N W 6 4 6 0(00,-.0 00000 V 001 O.- 6...N M v 60 N .666 ..44N 64646 664.6 60.6M 66M6. 4 4Om0 N6W.- MO,6N WmmO MNOW, OM,-0,6 MWmMO 66040 6MO0 MVm60 M MMMMMMM000MMM00VVVVVQQQQYY00000Y0) 000 00(00MMC0 ) M 0V * 000000 000 C0)000000) 00000 0 O C N CO W ZmV N n00 r M 0mn 060CV V 0 VmmA0Nr000NCNMC0(V NW0M8m,f 60M ,- 00) ) 000V1- 0OOM0 or-co.-co n00 0C00OW 0 co n6r m mr 66 66666 W 64^W 4.-mN46.6 W 4660 64'-6.- 4646r.: 40,4 N 66... 6O.O r > 6mo NQr6O 66VNW rnt6 MOmM 6M6MO a0.WNV ,OMm6 00000 MmmmN MV0)6 , NNN NNNNNNNMmMMMMMM VVVVV + VVVVVOOVVOVVVVVQOVVN NNNN M MMMMY OQ4VV VY Q OV OV L'O 2 5 1,0 00O N M O NAmVVVO � r V N Mnr a O 8 MNOO MOWM , 0 6 , 0W ,,WVrm06W N C00 MrmYO 00064 W 64.N 4 6 6,6 O M O n 6 .646 r.:6 n WW 6 N W O m 6 6 6 6 6666 666666 .666 N 6 0 6 N N 6 6 6 6 46,0 O,-NM4 6,660 aWMr,- OW^60 .Oram W,-VOW QNWn ONO66 M.-06V OnM6 N6O,W W00W (0030mmOnmmm60AAAArrrrrr6WW0mmmwwwmm0mwww66666 mmmmm 66 m 00 Wrrrr 6mm y n0o r m O NON M n W 4 W N m 6 6 M V^ 00000 On n M00 AA001-WW r N 00)6 6 V O V 6 mN n m 6 r N W O 6 6 y.QmON NQ0,0 QOMmM WO6ON 66060 CO WWVON O6nrV O ,00 0 CO666 M60.-M aviW.- 0) C OC1,rm NOMO 61,6 n0N0 O6r0 6t-:4N6 r06NN C06 O *. 0 N00000000aa00ppmmn Annrrrrnn 00mm000600 060100010000000 00000 600m0 00006 (0(0mmm0000 ,0000 oyE^ m 6 V O W N m O M 10 6 M W N O O 6 V 0 r O M m w 0 m N M M a r W a g 4 r O r W CD O MM rOM Wr O6M 0OwnQ m.- aM 04,101-V 6V 601M CO W M MO 0 V6030, o M g 4..w 666080nrin0) wwwor m6004m MNoi 0 (04V V<MM 66666 ° 666NN OOO OO6666 ww 60060 « MMNNN6 NNN wit-.:666 NNNrNO V 6 Y Y O 4 6 M V 4 V ,v.v. V 6 N N W V O M O 6 V n V 6 . 4 6 n W V,-0300, O n 0. 6 N n M. . ,0000 �MOr CD 0000.0 00000 0,000,0 r W 04 000,70 ,W000 .60m7 NN000O 40044 m4.4. a 0M m t0 6 W 660 (0 �60i N M MM M 0000 M .MM. . M MMMMM 0r 60V6 66 N O 6.444 66 nn 60,0,00 000000 6 V 44 4444. 6006 N 00,n O O 00000 00000 tOtOto .O m 00.06 000)0* 4 4 V a 0000000 0000000 000000 MMM M 00000000 6m44. O 6^0 0 0 0 00000 0000,- 0.0000 M^^W^ 0,0 0,- 0000.0 W O a r N M MOW., .666m O W m r 0000,- Wmm,6 o m N,-m V 2=0000 00000 OOOON M 6^W 6 00000 a 0) 0 6 V r M N O 6 N ,M,N M 6 0 6 6 V 6 n 4 n .4.., O 6 V N^ m O O O O .6.6. 060.4 .N.6. O.r n n n n n n n r n r r n r O O O 4 W6 6 N n N m r 6 0.- 46666 r N 6.-m 6466 6,W N 6 ONO ,ONO, 004000 WW66, WWNMVV0, WOV4MMN NOAOO,-NV ,VV00N MMM QQQQ OOOO6 6nmWO 0NMVO w, 050 V ,0,0 0OoOo MrCV , nrnr6 6666 66660 00WWW WWWWW WWWWO o 0000 6 rr N 6 U C E _ U 0 0 0 O^04007. JC mm W W O °ANON O6mm6 O WOO YMM.- coW 6co6 V M n rM cNo°,r°^Or 6m64.- M6a.- W ML.NMam PNNm MAN NY,, mrMMY ow.-nm °MOON 6° mMm0, 6,0,MM MWWm° a°MaM OWnNM mNm PNmO6 ONNMA mm6Wm OMQ, m m« a6°W Nm,-m0, °PMN NOmmN °N,0 NNNW° mMW MN°OaWMmMr OMnNn .WaW M aW "'^ WWWWW WWmmm ,An00 MnMpm0WOA 0.011-0,00 pWm.. 00000 OOOOO 000 00000 aOMM W. mmAnm ... V YPtiN Ne-m-00 MMWW O °mmm °°mm° mm°°° °°°°° °mm°° maaPP 2CDmmm mmmmm mmmmmmmmmm mmmmm mmmmm 0Dmmmm mmm mm mmmmm mmmmm mmmmm mmmm O(�) co 0(d M O6 66033 66 M 010 OC(d 00mi and 66M M miM MM 6 and 6MMM MMM 6m midM M 6 666MM M M 66 D 66666 66603M 6 Q 4444 Y V P a P 4.4444 P Q Q P P P P P Q P 44.444 P P Q Y P Y Y Y Y a a a a a a a a a a a a a a a a a a a a a a a a a a a co 01111 11111 11110 . trie lotoo ooloo 11111 11111 11111 11111 tp N°W W 'Q 471-P,71"m vptpp cm,m0 0 Wa VIA{°p 4QmmrcO nNNO� $040° NA V TZ0 OmG2T �CONMN m W ZIM4 P O (AO YM Of W c M 0D M W rim NOM,W m6A W m 0 m M COMM0 POMN m°° ,a,W °aM�W °m6a W NOM,M M W°ma N M OraO° V m.6 W WM.MONWW,, W,, Vm��N Ne-e-e-o OO W m Q��-O W W m A A m W o M M N M a 6 6 m A A°r Q 6 m m'm W 0 .-N M M VV... °m°r, ,m m m m mmm m m m m,n r n n r m (O m mm° 0 0 0 0 MWi MWm W W W OO W W O 00000 00 00 p 6 6 6 6 6 0 m mmm m OW... m mmm m .0000 M M m m mmmmm 00000 M M m m m 00000 mmmmm m N MMM M M MMM M M MMM M M MMM M M MMM M M M M M M MMM M M M M MMM M M M M M M M M MMM M M MMM M M 6666 O O O O O 66,666 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O O O 66666 OOOOO 0 0 0 0 0 66666 OOOOO O r,nnN nA nn ,rnr, rnnnn nrn,n nrnrA rrrnn , a rnrnr rArAA AAAA, r W^°O°W N N°r M n 6 O° °b a a(M a s N a O V02,-MM N O 6 6 P O W M m W .0,-01. 0 6m r M N° MM A m Q CWOMNO mVmoa mWrr, rM6M6 P0Ne• MAI-NP (1,-NON °OM ON ( OrN °nmM° °WM6 M N D 6 W V M m m 46666 ONa m W .a W Mi(M M m^, 4c664 r 6e-aim h66mA Ar Pmm mNM m OMIA OCA NA(TOO N b m r m n W O c 74 N N N N N M M MMM M Q Y Y 6° I m W c N Y°m O N n O N 6 °7,a O M M N 6° 6 W^O O W N 6 m m r O a A W N N N N N N N N N N N N N N N N N N N N N N M M M M a n V a m 6 6 6 m o n n m W°W G O O N M M a a a 6 m A A A m O O O O 4 0 0 0 0 O O O O p O O O O O 0 0 0 0 0 O O O O O O O O O O 0 0 0 0 0 O O O O O 4-0-444 a 0 0 0 0 00 000 0000eaaaaY aaaaa aaaaa aaaYa aaaaP aaaa 4444.4 P a P Q Q 4.4444 00 00 p m mmm m m mmm m m mmm m m mmm m °m°°° °°°m° °°°°° °°°m° m°°°m m mmm m m 00^.- ° .,.Nm an°a'- °OMMa W M.NM 606 W OOm MW W n mnMam OOOMWIM �OMjhMN 6 W mOe- ON W N W C WaM.V m6coom aN•-r6 harMo W W m W e- Ma W W o MNA�N NM YM W 6 ° r- r- ° a066 I� ,(opI top mWD OC 0MR TNNN° mPT 066 OAE amD ON MYI a(Or mM0 ON MWONAAOINNN NMMM^ Oaa6m mrAr mmWammWO00 NNNNN AAasa AANAR NNNAN N NNNN NNNNN NNNNN NNNNN NNNNN NNNNN NNMMM M((7 MMM M MMM M M MMM M M MMM M M MMM M M mmmm mmmmm m m m m m m m m m m m mmmm mmmm P m mmm° WWWWW P P P P P m m m m m m m m m m P PPP P °m°m m h h T N .MMM..T T h h h N h M O h O M N N T h H T TNN h O M N T N H NNN MWI MPI NTT M T T T T h N TNN N T T T T T h T T h h MPI W0o00 •r- O M I-m N V020,00,- O M°M a Ya 0° (0,-0.0M M m M m^ ',RM.., 00mmDMONeMmW rWmm mOW Maom.- MNOe-aM6000 N°.-Ori aMMna NNoOM PO W MmQm NOVO,- W W°p ° Y W 6° Mna°M O^ ,- 0 W M MNme-m OON,M Am•-W M 01660,0 m6 W NP N P m 6 6 a O a O e• h66 6 m m e-a m M A 6 a M W P m A r ,-003,01 °N Y m^ m a N m a MNP a a N°W o 0.00M0., co,-MmM) °m.-M P CI M i G I A M i M r.:O M i(V 666,:6 (dM iM IM ih I A r-NIA m C A N M M I A (p m m C OW0 0 W OI-N M a P m .000. P PAA A °W W O N Q 6 A MON., W N 6,0 MOWN. °°,O M .0070. 6 a r 0 a M N 6 W N °W W W M W W W W W W W W W W W W W W T W W W O 00000 mwn O N N N M [MnaiY YW YA6 m,n[ 01m 0 0 W a Y a 6 QQYQ PPP QQQQY, YaaYY aa0 00P0 PPPPP m WY°W.- °,a,03 Nn„W ONNNM prAONmOMMNAO,ON. Q ZOPOM.- .Nm-Wo PPNaa ON OQomVNmC N VAOMWN4m� WNOPm6 OCOap rTT 46,-MM mmTMWo MOpm OMMO NMV0,D COMMM OMW 0MOD A P N.. Y MMMM (000(3 0 0 O O Q Y.t a a a v a VV... V a a 0 v ,,,WW a V a a a *0*0 a *0 v 0 a *00*a Y V 0 Q V 0«V a 0 - �m0 y O PN�WO,-PV mMOPW WN PW PYpO .0.N. 0.V M -ON6V e-0 V O OOMWr TNr 06mrnm _ MONn0 OW MOOWOOYOMM 60, W p M °WM W46N 666or NMa°m ciONNN PNOmita NMOmW PW0,46 O WNNWMamYMpm, rrOWpWN6 ' ANNNVVp.0Wr, apM NN M aVVY, ... r ° WO7000 NrrA .v0 WW .75aM N 0 PPPP PPPP PPPPm mm°.m worn, , m mmm m ° 0 Q Oa W a NN°Y° NMr6M W m6mo ONm mmOPi a W Ona m V.V 0 O W me-M ON,MM m° mmm- NOV,. N W°N ° Q Z A O O M m^ (0.01-0 W M W A m A W m N °^ W m 6°a m o 1� CD° 00,.N. P P O 6 W 0 W m N m m Q O PP 6 A 6°°P Oi OM OMMvmd rM MoScN 666066 MdCdo o civ(dr OI GNMY666 .4 46466 0<mm rNM° 660666 O m°V Od O0, V v Mme-P OMPW NmWNQ 0M,OM °WN6W an0 mO.(0 ,-YrP ,- aMAOM m 0as x6666 PPP„ ,,WWW AMM^3. P666m mmnAAnOM0 MVV.. 0nrPP 0 mPP PPPPm mmmmm mmmm° rr 00000 00000 00000 m C 0 W m ePYP N W W°O ,°°6a M.,-.000 Ona°M ,-.001(0 M Nme-m 60 NAM V P^W M O66o N O m6 W NP N W WtOO^p 66a 6A6mm 1-VOM, PMWP OMm„ ,-(003,(0 °Na°,- M°a0,o MNmY NWO moo n n O m WPM W Y O 4 6M.-66 N60n6 6n O6 N 66A00^(0 NMYYm W.,,, mmWWO 1-NV., WON6r TN6n0 °66. W W^1,NOAmM WOION MMmM 6A td(d D;O M N b W0N0 6 9 VVVOOVdVVVQVV00V0 <VVV00OOOO0MMMa00[ O,, AOOOhpp000Y. O 0 0 °m°DD 060 2 a MO 0 0 6 W M m A N O O W A N 0,6 6 0 W A O 6 a N O,a a O N N^m 00.N. m N O o W N°O O M m o Y m P mm,m,- Nm6 Qr 0 vw,m Cpr Inr-r-h W 0001010! M 66 YN ,°PPM m.-n W, °0166 m W^O° W °CIA YOM .664c6 A a0,N Y 44666 aY YO Mi00000 P P W W 66666 W W O ma^ Nm�M6 666.66 mMi OG66010,0, N MVO, P WOO, O 00000 OOOOO 00000 O O O O O N N N N N M M M M MMN N ,-0000 o o O O O mmW mT0m0OOOOpp OOOOO OOOOO OOOOO 00000 OOOO OOOOO 00000 OOOOO 00000 00000 0 °° 00WM WWWWW WWWWW WWWWW WWWWW WWWWW WWWWW WWWWW WWWWW WWWWW WWWWW0 W—0 N A m 00000 000(3(0p. N 6 6 Y N 00(3000. (00.00(0 N VO4.00. ,6 N W W O r r m M m 00 OM A N O r 6 6 a r 6 0 6 0(0000 W (000(0(0 6 6 6 m M a W,m° 0(0000 n W a 6 N A N M W O N O P M Q m A 6 M N MIM N�- N 0 O W NOM.* 0,-D1,-00 0 p N V V M M M M V V V V V VV V V V V O . mY6Y66°01N MMM MM<a VVP aMMMMMM MMMaYPPV VLNVMM , °°°W MWWWW W W W W W W W W W W W W W W WMOM.” m m m T 0 m mmm m m m m m m m m W W W °W W W W W W W W W W m m m m °m m°m a D M W a D o C C a m m m m WOO... m mmm m ( m m m m m W(p I1 pp m m m P P P P P P P m P 7�.mnT(PV nTNM01 NOva� V IOOCM3,- MCOMMO 01P(ITCPIa wm00N oWNrr NMODmN 6TY V M MON.. pp TM V N N'I' h<Mci(.i MY0MN M O” M(PV ON (6+1Mv V Y 011 M�MPi fOm (oArlrm Ammmm W 01 N NN WWW °WWWW WWWWW W U P A P O M 6 A M (000(0(0 0.00. m M 0 0N) (00000 W r P 0 Q Y M N (000v-, O W 001v-.0, O M N 6 0 0,a m N c °^ma OOP PMOPM N00 W" 0,-•-04M .Ya*M ,Nn00 000^MY 1Maa 03)100a W N W MA mmm0. AO°6e- m 0-Q r 6)001 Y A cY AIA AQP a0 ai W 0 r 000000 001000 O x000(p 00 n0 0. 00(000 Oi0..a A M Id.00 0 6m°° nnnmm °mmoW WWWcom Wco°WW WW°mm °comma, mmmmm mmmmm mmmmm mmmmm mmmmm WWWmm m 2 .0 00 M O,-p N N ,-O DO .-O NW O m A W O f N O mY PTVr O M Y000, 0 0eWMMp NCN OcN 1-0IMNW A0 0301 O 46066 WOMMM PPM P W e-NMMmmOCO M a°° W ONa6 P W ON0W N a 66,06 M V, .(dmdavi i� .-Ma6i N 6 m N N m a r 0 a r O N M P W N N m 6 m e- Y r O M r O m W N 6 W N 6° P P e-P P W N 6 W N 6 P Y M P W M N N 6°m- Y PPP' m°° W W W O p 000,-N N M M M Y VV... P 0 P P n ,,WWW N W WOO O^N N M M M Y Y 6 m n,r m M000,- O V r- N N N NNN N N NNN N N NNN N N NNN N N NNN N N N M M (0)')MM M (00)1MM M (000MM M 0*a a a a ((y M W N m U T g g 0 W3- O i-0 0 • • 0 C J• . dppom = opp cmwm pEH 1:',321i-.P rn 'Dd mdpgwdENE P< f a J mym miimOmNvmnEWm bmmmm N0mmm <OPe @«VV V«<O VVdVd rG <d d V P O Q O p d m V wN omun odm om Meadm m oN N8 E O 4. VwmGwvv 3;4;22 4242521'..-88g `011; 88ow m n mnNN A nm nN EARA SA'A`A'N AA nm E AS N sood g2,'22o nnrdr nnnno ��nnn oorrc N N g'ii`2 A,'=mi Nug-`22 `n om v m12 nmam-2 2mn'^^ SAS t�»n21'1Sa nRm�o Nv< .2 .O Vf N d � �- w 12'832 N �tmf S NS O ,�mmw0 .-NNC! dNNnO w0�'� dda� MIR Y N N Y Y Y d <V N NS <P N p 0 Til mmm�� ����� EV, �mDp��mpp��m mm�m� C OOm.00 vlyYNrnn� OO'23 Mr6 P4 mqm OmamDNS2.1;24 MNOTm 22%24 :1—...417-- Nnl2 ry N - � O O 0 0 0 0 0 0 0 0 0 ^^p l' EEE EEm7 Mcg t7t7 t7EE mm C01�OYER N m M`MmSN Sit Eri MSS NNNNN �w'IhEE» N4lbyppwjh AA: T N O E S 23e24'4' N mm a O'^ O m O�.N- O O h 0 0 T o tma, 6 6 6 Q6..,,. 4urom. ,2 Sm cL=&.rcasc w '2,=R giaoom nrnm'm ^nNM1y2 Im`Nv " rOmm mmmmmmmmn :82 44217,S2 8.'4,2!130 V;222 iC r^ O ddON 666664,,-,- N E N N N N O w.- M1 N N a ««‹<&& ^ mmw Tmnnr rrrrd•.'g grmrwr rmmwo mmmmm s _ 031 NO N` w N E E NN w r m N m 0O^;N :m d nmr ,,mNo „ Mmd mmmmm NmeA OnNMdociNNNNN wow •waw 2222:-. m20 st.rrf rnr. n o ¢ 666tie,ddddd Yddd< dddY d VVddd Vddd 4 0 000 Nti 7,Nx SNNM40 3N4t`O 21;'22 NOmN2 NOMmm 'arr0qO rH)6-2it El V WNN dmmo� mmmmm wwwwN wwRS2 IdI3N 4 ��� El Q a cIL '. QM:wm ppN0AaVnmAO. nOmnNif rnPNOW NnR7rn 4 - HEE8288 O00 ( Q 41'frnf rnDN.M12�mMOm lCON G 2w-M1OVmYr CdNgrnrn . ooo000+o € O 22 E �i m m w n�•-o mWg�<9, 4dNd 0 IPM1�,dEmW, d.w^Nw W';:gmm m Q oAnnnnn ��O woL<om NmNNm rm.wnC Nb mmdmOYaON 1A mGwwWw w la %gm 0eorrPng r '4222w; mmm0O '9d • >in F n mnno" o mo om�o rmm r v win "'C p - ' -P, v ad'man ry.0 Hill �.i <uiPov Mil (0 0 CL C-ai�n inw v�iw� . = HAI Mil mrnwww rnrn o NN _ ., O10Sw ww owl . u -iii" W.. mmmmm mmmmm mmmmm mm W Q QgQQQQQ Q d C 0 • rn IL m„5--""2212 :=224 f Em4O !1',13:3,7. N7 N pp 00 ry.c . mrd V .,..;d NO NMY gin m mmmNN mNN EE t�EEEE mmmmm 'MO n ym$y '0,NOS YO W 0 EEEEE mE0a0 aD 'MO 5 O..pM.,4-1-. N.01d A2 w C 6>> y Hmn N T3M=s4 yy71GN E:P141 � DD:42 O2YOV U E §8822g08N+:2` $SwdIm 24,222 'o-Orn 8ISmm mm w Q O0 `)n � ;E 0 N00NZZ N 0 2 m212 -412,2 NN p. N F f w WN n m s. v +Y� ��pp : °'LL LL m B O 17 f Omi,En .O a43nd 42233 gN�Dpn 22242 vwiOmb O ti �•"•"""•'rt�oe- r m ONl ON1 m m N w rn w w m m b m w w w N m 2%223 n M1 M1 m 0. y w U. WLL, C mr 1 • 0WI,..0 c-n- U i A- :: w®vdw: omvmiw`n `,'APII: .gnUmo �ma$o 6 ..., UPI N ai a vi `.'vi o m a o N n �i r= ,o ro .$,m nom mmNm'�pp��pp nm mm nuc Nmm wrr I O dd 0 V' NELN NE ENr r NEN Y03�, O ___ ----- --- 8' t0 C M n a rn o E 'c N S A y E ., w 6 .. P a H • • North America - ALASKA - BP Prudhoe Bay PB R Pad R-16 R-16A R-16A AOGCC post-job report 500' radius scan Anticollision Summary Report 24 March, 2016 • • BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Site PB R Pad Project: Prudhoe Bay TVD Reference: R-16A actual @ 65.85usft(P273) Reference Site: PB R Pad MD Reference: R-16A actual @ 65.85usft(P273) Site Error: 0.00usft North Reference: True Reference Well: R-16 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore R-16A Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: R-16A Offset TVD Reference: Offset Datum Reference R-16A Filter type: NO GLOBAL FILTER:Using user defined selection 8 filtering criteria Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 500.00usft Error Surface: Elliptical Conic Survey Program Date 3/23/2016 From To (usft) (usft) Survey(Wellbore) Tool Name Description 115.20 6,965.20 R-16 Srvy 2 GYD-CT-CMS(R-16) GYD-CT-CMS Gyrodata cont.casing m/s 6,975.00 7,555.00 R-16A Srvy 1 GYD-GC-MS(R-16APB1) GYD-GC-MS Gyrodata gyrocompassing m/s 7,604.21 11,411.16 R-16A Srvy 2 MWD+IFR+MS(R-16APB1) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 11,467.68 11,499.42 R-16A Srvy 3 Inc+Trend(R-16APB1) INC+TREND Inclinometer+known azi trend 11,531.21 11,940.23 R-16A Srvy 4 MWD+IFR+MS(R-16APB1) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 11,973.20 12,003.94 R-16A Srvy 5 MWD+IFR+MS(R-16APB1) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 12,033.23 15,818.46 R-16A Srvy 7 MVVD+IFR+MS(R-16A) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 3/24/2016 12:23:33PM Page 2 of 4 COMPASS 5000.1 Build 61 • i BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Site PB R Pad Project: Prudhoe Bay TVD Reference: R-16A actual©65.85usft(P273) Reference Site: PB R Pad MD Reference: R-16A actual @ 65.85usft(P273) Site Error: 0.O0usft North Reference: True Reference Well: R-16 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore R-16A Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: R-16A Offset ND Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB F Pad F-37-F-37AL1-F-37AL1 15,664.70 18,050.00 105.38 259.90 -26.76 FAIL-Major Risk PB R Pad R-12-R-12-R-12 1,629.14 1,625.00 434.11 21.32 412.79 Pass-Major Risk R-12-R-12A-R-12A 1,612.79 1,600.00 433.91 21.12 412.79 Pass-Major Risk R-13-R-13-R-13 1,585.70 1,575.00 327.13 24.15 302.98 Pass-Major Risk R-14-R-14-R-14 1,586.52 1,575.00 218.50 23.85 194.65 Pass-Major Risk R-14-R-14A-R-14A 1,586.52 1,575.00 218.50 23.85 194.65 Pass-Major Risk R-14-R-14B-R-14B 1,590.00 1,575.00 218.54 23.88 194.66 Pass-Major Risk R-14-R-14BPB1-R-14BPB1 1,590.00 1,575.00 218.54 23.88 194.66 Pass-Major Risk R-15-R-15-R-15 1,586.57 1,575.00 99.82 22.80 77.02 Pass-Major Risk R-15-R-15A-R-15A 1,590.89 1,575.00 99.86 22.83 77.03 Pass-Major Risk R-16-R-16-R-16 7,065.21 7,050.00 0.44 3.24 -2.60 FAIL-Major Risk R-16-R-16APB1-R-16APB1 12,024.99 12,025.00 0.50 0.83 -0.33 FAIL-Major Risk R-17-R-17-R-17 2,143.43 2,125.00 107.54 30.84 76.71 Pass-Major Risk R-17-R-17A-R-17A 2,144.59 2,125.00 107.56 30.86 76.71 Pass-Major Risk R-17-R-17B-R-17B 2,151.74 2,150.00 107.70 30.99 76.72 Pass-Major Risk R-17-R-17BPB1-R-17BPB1 2,151.74 2,150.00 107.70 30.99 76.72 Pass-Major Risk R-18-R-18-R-18 2,294.38 2,275.00 194.68 34.09 160.59 Pass-Major Risk R-18-R-18A-R-18A 2,294.38 2,275.00 194.68 34.09 160.59 Pass-Major Risk R-18-R-18B-R-18B 2,294.29 2,275.00 194.67 34.09 160.59 Pass-Major Risk R-19-R-19-R-19 2,476.86 2,450.00 304.92 37.45 267.47 Pass-Major Risk R-19-R-19A-R-19A 2,476.35 2,450.00 304.91 37.44 267.47 Pass-Major Risk R-20-R-20-R-20 2,197.10 2,150.00 424.77 28.34 396.44 Pass-Major Risk R-20-R-20A-R-20A 2,196.07 2,150.00 424.76 28.33 396.45 Pass-Major Risk R-23-R-23A-R-23A 12,281.56 15,100.00 204.17 269.53 -5.11 FAIL-Major Risk R-25-R-25-R-25 Out of range R-25-R-25A-R-25A Out of range R-34-R-34-R-34 713.82 700.00 477.91 11.13 466.78 Pass-Major Risk R-42-R-42-R-42 Out of range R-44-R-44-R-44 1,229.66 1,250.00 384.15 19.10 365.07 Pass-Major Risk 3/24/2016 12:23:33PM Page 3 of 4 COMPASS 5000.1 Build 61 r • •qf) 0 0 _to 0 O 0 •/C. R-34 _._ W �$ -____- -O 1 rn 6 :4 14- ' o 2 —o m O \ a `t.„ •0 o V9lEra C*1_Q6~ —i8 mo ill r6 0 _o r 4 a0 2 $ o :0 r0 _.A :2 0 '-SiZe-.1__,, it C.) i \ ..6 co co i , H C_ 1 , , 6 A oo to II .. W ._._31 - —o 2 m O b�p�•�':8 a o 6 N •.4 :0 0 �` a Co N + \-1 ' :0 ,6PQ�1 `'� �� 0., .6 i Z o .8 co 6,P" ti ••' i 4 iiiie, -- —o^pA ca tlr`• 0 9P +.tiro a40 �,. to00 60 6acb o o co Q P PO 1% ,6 11"-Y1fZ U_88. ati a _o PO..• 6 ••4ill roi 4 . i,,,,,.„„,,,,,.. 1 _ _. ti ^O 0 0 ,I.,0 6' ,. .. /. ecr,. i c ..... •C Q Q W Cl- `�•,y y 7 •r 11 N C N � : N . a, 4: A, jiliatif;'cv �-— l r Fr r 1AP o�>n to I I I I I I I 1 I -VON- . I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Cl_ Q)0 0 0 0 0 0 0 0 0 0 0 0 0 0 co 0 a W N CO 0 7 tD ^ CD ti? N co t0 lA V a C) elN (ui/1}sn 0021) (+)43-1oN/(-)41noS N 0 0W W Ci.. o V o v o CC S o a S c O O p W W N F W N 0 N W Dco_ 0( W ❑(N N 0 0 o, a CL ) ZNI ) CI HZHa U O cmw mw 0 Q o .- o o U U 0^ p J X 0 0 X C a) _O Y III J m m J mY 0 < <O N _ N Uo J ooWNU T O w 0 T OO o O O o� • .� Z ao 21 a a m 0 0 0 0 0 N V n O N I N00g N 0 5N O O O ,_• .• 'csi O N w t6 a O 0 a O a) N .�� E '2 L WCA O N a) 2' N N Z` N W a C C $ C C Q C a7 U) x 0 O X F U ? O 0 W O 0 2 0 W 0 O O O c .. 0 2 a' n a a 1 W O E ❑ - 0 0 0 GILL C7 f.( a) O O O to Q X m H .0 2 - co >- C ID a`) fa c U COa (= a C N 3 •--• .--• o ' 00 U co 0 - o >- J O O .c, } Lri 0 O O o N H V V co co CO O N u O O a) • C N N a) a) ❑ N N J E E d O Q m N co 0) a y.� C O a) O O L O U) f6 O � E O• D' E O 0 a' U) C 2 = C .- E e- Y O a _0) _ (n O g <n O co W a > C m .c .+ n N a) > O_ N N > r/ -12 O {a O C N U a) N N O 0 a) —. �0 E N p 0 v) 0 0 a) 0 0 W Q N o E 0 0 o x x ? > o a) x x > > m 0 o at 0 ❑ W W v) a V ❑ W W CO a > F. o E 0? U d o. m 3 o < 0 C a )d 0 ti t% m E m '� UF" N O rx a' 0 ,:;; LU cc N s a 176 o Y o Z .- o 0 co X L m a \ m F' N Q 7 N d 9 (n 0) a a -c, d' '' C '0 N O o < f- O o ff a 'Z O c O N C- op U M Ln I- oo r 13 = N N O r 0 cd N cN O t` m a) E v E c a 0 m y U r Z > 0 0 0 YO co U U) y a O N O N a) ,, I U) U CY j 0 C C _C m o 2 a) o 2 Z cTD 9 > > rT Oo > > z, Or (' m 0 N C y 0) 0 f0 C m Q Z to CD. < U) 0f U H D 7 CD) 0 -1,_ Z W W LI W i=- °- to 2 z - J < W Z Q a 0 0 0_ a o Z N W Y W W O d L. O O m ❑ W V O U 2 ce w H w °' 9 z = Z J W .. 0 0 O W Q O O O to SII J U z W d d o W CC V o U re U to )n H U a a) 0 o z co 0 H a, O 0 til to (J W Z N E im Z W iS E - @ 0 6a. W N '..m 0 W Y co a C p) E N U co Z o W Q o o. E - H 0 a a a (N -`5 E - o 0 0) 0 a) a d O O .. U a 0 H (6 0 N y O .. a) 0 a) a) a o > N a) 0) E 0- ,� a) U a) H m u0') a c c O m o Z H N ❑ > 3- 0 z H N ❑ > a o 0 a) c 2. a) a) - a O .. w H >, 0 () H r` u7 r` O ,-.1 a E c > o E E 0 5 :0 �' o__ a Y a`) a v, :a _ a -o --(') a`) -o �n v co cv p m_ U Cl- W U ❑ 'O U U d cc O J O 0 0 .0 J 0 O O 0 co — 0 ❑ 0 ❑ CO 0 LL in a r U 0 2 0 u. cn a 'Y to 0 2 0 11 • • N U o L N 3 3 a) a7 a N fF . 0) _D C LL Q L N (D 3 Q co co-L LL m up N / a / N U H Ha - = a�) 2 m TD a . a) U 2 a) U L E (n a1 D `N-- z Z a c)N U (7 N _ N O N a) N C. a) a = a) E d a n C, U U n °o F N O a1 H T N N 10) WcoN E .a j a) O u N f' a) cop_H C LLL F O N E E L H U O EE p a zn N E c oa) } U C a H ICCD a . ;, i C Z U) C - a a w o I J ,„,;,;/./ a) a LL co I 1Lr U < X a) u)''' L a o E c � Li o a) 0) UCO E N 7 2 a ~ m4Y N (nC E _. .. zVft; a co El z z co Camao_ a ^ E c0 N a E -2 OQQ7 N L a) N O _ LL d CN I> Emn N IJ o co to a N _ a) v 0 TD al O CL _ N Qa Oa - 2 a7 N v O W' st 0p m - 0 QCO O pC 2 o 2 w () Ea. C = Td C 12 5 0) d w 2 > I'm' _ oa m Cr ° E o aa o E E o . a o as s N m a m o a� I- a) o .. S a) x C o0 co w m C c U •a• ! �n 0 o N E rn c E H c o a°'i E E a E .0 .. N o E _ co _ o p a } o. 0 J a z H U p o m U 4) d ', ui LL O d E X ~ N .0 I) N N coE E m Vi O co 3 C 0 co a7 a -O 0 Q d -pCO o a a �° E o 0 , C ED a) 3 V t', ' i s o > U x HH -, w z x z ;/f' Y CO H a o - ( m .0 N Q o m a E' d r Z E o O.L.L H U N a ~ m re ai a) 1-a a c d U) w a N m m E 1-p E g F g z a d 0 a7 Li H 0 ^ N': rep; cu) ¢ o a E 2.2 N / F N c v -9 TO oa, ,- ~ v Lg La E 1 O o N O E o Jo N C o co omE i- = mo (A O 03 vxY _ J c p V . o u 0a p N w H U i t9 d LL p C a) (D a o o) 0 E r Q O LY E `;� L.L. u) V _o z N - o a. �/ w � a Z o a) a /'�" O to o E a EC o c ?E .o m t v 3 o a O O a) u.) > a U w z o_ z z v = 0 u l o a o uJ z m m d Z J >. 1- H m � Z m O —) O H Z rn a o o < O a) w C L y 0 ao X 0 , o_ rn 0) 2 -o 0 c rn o ai F t E w u) U a U a) E m z w o H 2, ” E a' (oi m a) w Y m >- a d r) Z o LL LY (p l Cr a_aN 00 _N a . JO a N E a N 0 o a o o_ w 3N TT; To 2o 0 . F u to o w EO tE oi c — a) m c oa 3U / o o 1.b:">) o L Op c i o CC d v v a aL U a w U D H Yii E m -c o w o aEi o H H U U D 00 U LT) H = • • N O a) 0) @ W O W '-f-1- a. a _ O O C ' N H W r) J H W co O V R � 0 a w D N �J... N c 0. Q a w < C S 0 C7 S 0 (7 @ m g op s oo Z o H Z H c r. II ao co U) Q W Cl) L6 Z w U) 0 � ° Q m 0 — m O W O O w 00 0 N J o O O a co �Q[ 5 -' 1.:.. o W o E . .. E y. < 0° < m < N 0 >. E N >. ° m 0 o O o 0 p Z 0) d LL O .0 LL 0 _ 1 0 U -o U O O O O O Q O ;) II N II N O O O O Ln p N J S N > N N V LO N O N O X W N 471 N O O O O @ • La a) @ a) N E 0 0 2 2 0 a1 tl) • N N N 2 'H) N @ W a C X C V C X C f@) E V C O) N X a) a) X ry F- 0 0 2 O W O O O w o @ o o o a) > 7 t o zo N- ai `0 a E 0 o) 0 0 @ a W r) a u) < X E o 0 @ o U) oi > a a a C In Ir O = a' ^ CE _, o �'' ' U u) o p > _1 o o •q >- . O O Lon L.0 el 0 0 0 N .N.. N N > a) 0) C I N N J E E 7 0 o- N N a) 0 Oo O 0 m @ N C Y �" @ O U O O' !] ct N Ln C 7 7 — C 7 __ CL A' IIc 0) C p O O O — O !n O U) Lu o n N w > 0. y a, > O A N y C N U N N N V a) a) Q m L.E o 0 E o ani x x = > p a) x x = > > L s✓ o q @ o o W W u) a O W w u) a > tai ,_ 1 c N 2 0 w 0) o C I Lo v a a CD a) Li 0 a m LL IL < o U) C a) d et EL. M © ((y E o_ E n - 2 .5 t V N (0 a 0) U L6 CC CC W a O o Z +/ I co Y 'Q '6) O _ O o_ co C .0 a 15 N Q '0 d O o . V •• S] Q) O O V' V o O O N (0 O 0 &' C- 0 O a _ Z E O O 6 O Ln N O Ln CC a) N o a) 0l m@ E a E E a O La @ 0) r Z > O Ca @ m m U fn (n !Y Q 1 O N O N @ • d E C cr E C HT H �2 � Z ,' 0 H O (7 U 5 F- O C7 O U) O O W W W m O W _ a 0 O Z Q O O W Q < N Q QCO Z 0 0 N W W N 0 f H fn o A- •- A.-- W O W Q o ID W v O r = C7 O a Et W w Z Q o n O U) Z 71 = W -o 0 O o o OJ U H L j 0_ d O LU lY — N. O U7 .�. <n <n v O a .- V 0) VJ !r a a Z' ac @ W Z co o , w @ W fn 0 W Z N /' E m Z W 00 E .- N w N d W 0@ w Y m a ( C m E tq 0 co .Z C di Q co a C H f j 'D a N E 0) N D) N -- >o a a o o (j m E a CIII) °) aai aa) a o U o E. 0 m ai cn E a .. ,n a) U) @ E U H f`6 Ln d C C E O @ FT a) D > T p @ HT 0) > T 0 0 C E @ C .. z• 0) a) "- .0. Z o Ln H Z 0 .. w H N- Ln O N- c0 a 0 0 > o S E E 0 m 0 :0 o_ -o Y 0)) a Ln V. Z' a -o - w -o w c a) o 0 m U a W L) -) U U CL Ir !o 0 7 7 To @ L 7 @ 0 7 7 @ @ L 7 .) O D 0 ❑ O Ii w a In 5 a a. v) a > O 2 C7 0 • N U ° L N 0 0 NE O N c W a N O a a O] O_ O O U E o J ,r, ` co O U Fa) H m - U N O m N O N Q c a, N . w a) N _ O. a) .� L a) a6 0 HNNFH Q o N N_L N .0 W r- O0 O m E a Z U c ';ILI, (A o C 1 W9 r J YO a X Q L '5 t E O) a7 u O a) a) °.� U E = E 2. F t","/;;;;;;':',1, i H a m , Z z m m a w a a E 11 a7 0 'z' (6 V d d L 7 O N t.. N o T, -O LI m _N E C 9 N N O N N J O U N O_ .. U a� a o m ai 0 fA d E y . v ' ` 0 ct N _. O 'O Y 9 O a N H C c 2 L ,_ al (n E _ 2 c ., co y W d' a' a� c d m cd m• N w a QQ E c m o m 'crill l' J W W O N 65 H E a E } L > H a o -c Q H in m m .S - 'P- .0 lL N Lp = 3 .p r of N N rn c c w E c U C ''opo o N E m d ~ • d ZZ F- U 0a E a m N U E N 47 N W o a > E H - c v C 6�` N 3 U a) G �,.� V O N O m a E Q ° E a 0 m a a) o_ I a) o U - E V N 7 : °- o_ °" CO U 2 wa)Et _ o W (a Lt_ H d } cu cn I - N a. O m 2 " U N r' a. z E O a °° U - ° H O a 'I , ai a� m a E -° a co- a a r. m m E v 2 a Z a. 0 m Li a_ a, �, z ° 0 1 v i N C N -O Et O) t r n m O E J UE fl_ E a) O LL v o a= m e 0 2 m ' m y x d' 4 J c 2 o D a7 a H- O O. 0 0 O y v LL O 2 au Co -. c o IE a o_ q • o_ a� . -�� u_ u)12 F a 0 _ z a` 2 W a f: m 47. ./' Z o O O a) . c N v'r 0 Q� p E O.. O w 0I 30 -6EL a o m a v �0 U O U W Z z z 2 0 tL o c a T O !O Z d N O E a) d ,.= Z - H F o a 2 U". co O - H z E - F', o f7: a) W c M L N O I� O �c oa m co a o mH o F v] U U 0 J N Z W m w Y > 3 z Oo ce a � c� — L a o a c a. T o o E a W y o N Z. T •- v ° V H '� Y v gi N LU c N c 3 N N C 1r U co d N IL d d !n 0. C g LT E d d a) U o w U H cn ° H H U 0 = CO 0 CO H 2 N 0 N os w w J O- J C as C a3 O O _ o CC 2 0 CC 2 0 C iN w LU o } w W o O LU D u_ LUD N d O d N W NN C a2O 0 < (a N "" O F Z H CO H Z F- C N- N r coi U) m 0 .- CO ❑ w O ❑ w O ; ,,., a op w J U U X Q X p X O J Y u N 0 a O E E E ¢ °° ¢ °° Q N U) a O V) T O N 0 o 0 o 0 La 0 a) d U- O _ U- O _ UU O O O O O O N _ `7 N _N P. O O O o O N co O N X W W > W a, > O O N O O W c a) as a a 2 a 2 ro 0 2 2 0 . o N z• w Z N Ja• NO oC �N C C aE , � C -- � a) X_ a ^ N aX ^ w 0 2 w ✓ 0 2 0 wc O a) } - a o O c co 6 2 e- 7 o a0, Z N E R aw o E 0 1 rm o 0 u) Q X N C O o .0 O o a o = o z o a C co a Cl) I X N a) m U) _ ^ ^ ^ E C = - n J .0 4 O U) D o o } _1 o (n a } w 2 o r, H v v r0 CD a) o NN u N ; O N = I co N J E E N a, _ m ,3. 2 W N o Q > 0. Iii 0ce Ci) ty W._.E O v a N w > n co ,� re no `° Fs' o m 3 a N U Oi �' a 0) momo p n o O N 0 o 0 ax( = > ❑ w W U) a o ax x(i > y ❑ w w U = V ; _a V > j O w (Q C U + rd' = a a r N 45E w c`OO a) a m LL0 LT- LL a 0 < d © e E a a a .0 U N _ a ns oLL (a a O 0) O Z m 1 Q N_ N a 09 N m -0 co (a O) '� (h a co - .0 d a N - O N O O d E O o u M N O O 2 W- Lo O N a 4') O a' a, U7 = m O) CO O 0 (n CO CO O ap m E a E CL ❑ aiN a) r Z > U U) N m U w U) a' < O N O N a) K = C a' = c C HT H O W a N (6 C N N Ta C N Q Z Y U) a3 X wp a) a) (a X ~O a) a) Q (,) U) a' ��aa w U 2 5 H ❑ 0 U S H ❑ 0 o (n O O J ❑ W m 0 a' a Q o 0 i re 2 L11 Z _ H Y o LU J Z ri () ao Nw w 0oZO p C] H 0 .0 ci O p ? EtV 9O Et Et a H Z = 2 Lu p o0o w a U U 0 0 a- 0go0 (O O J o aZ U) w O w Fe ,- u, O U) a u) u) o H U a u) o a) co E m O a 0 m W U) U W as N N 'E al d W Z N as Y m a c o) (a E Cl) U r) z o 0 ¢ o o. D C c7) F= '..N a U a N E ` a) a) O) a) a) E .. N E U) E E C ai E ai o E C a T `0 0 U d > H m E a a) = a) a) ) a O .. H U O a) O 07 U a) T N O a7 U) E a N a) U) 1-1 E 2 II) Cl C C C O Z H N _ T O Z FT O/) _ > >a O 0 C E a1) c C y, d a) oa O w H p w H N- CO o N- N- o 2 > o .0 E E a) m 'a :4 Z' o_ -0 Y a5 a w .a Z' a -o - `a) a 'a Cl- CO o (o r-- c.) Cl.: O a w U = 0 U (0 d �CL o 3 o ' a) (p L = N = _ = N L = a) o o QD ❑ ❑ a (n a >- w 0 2 0 LL in a Y w 0 2 0 U ca a L_i, 2 C N C 3 0 a m E � c.L Q L r a w a m a`) . _ w o E E ° Jo U E O H F a = a) 0 2 m N d U L E U) m D - Z Z C 0 U C7 `) n '5 cyNQ Lo 8 --- a7)� a) ._ EUa . co o 75 o HO U Ho U a7 wN O 11,• 12, CO 0) v P---'-' v E EL > _ o U) w m ai v ° ' at E L N c u_ F o 0M H 0 � Co, E a Z 1-2 c m o S a_ co E, N r O Z N.- U) 0 c `f,.i O. 3 Wo r J a). E .0 IQ X a) v) E E c m W O a) a) °� U o CO E a c a H m a E m a m y E z z co C CC 0_d N d d ^ C . O_ L • 73 o 7d a a7 Cc0 O EI d N N N CN N O, NN J U N N Vd aN m v0 NO ° m ? O acm /./ d 0Um ?a 11 12 E c f2 2 v) aN mu) ° om r d d d v a> 1) mn m C m > m H oC) E c aL > oEEU m YOYLL c E to cd d 0 d a) Nm Q R 01 c u UEI- az U o 8 To' a`,3 L E aX ' E` LL oo ro C. 0coui oo o a E • a o nm o COE U L E ou .^ �n 0 -,0 i f —4- 1Q a d a a a 3V Z O C 4.< N d O ti m 0 0 a N Z E o a m U 2 .Q H , • , a) D is a N LL E) d U) a d N ^ • i,.m la E "C F d Z a- 0 ca > W n d O ID. ca PI U U _ H 0 fA 0) in C o U E _a" o U) 0. H N C N -0 (0 0) O L U) O E M CO C N J N ) �' lL U E Oo 0- C a) O O co ICIO .O-. E F = m Lo O y co X (0 L o C V 00 i ] a1 H d O N O N. W W HO O S (0 3O o 13-L- C a) aa)) H co • m ti N Q 0 a Z W o o a) N ^ o a p W Z o z° .v ` mm o E > ao m LQ z z3a 0 wzz 0 cO U d C aaCLL Q S (0co o .co= to O 0) dNa] Wa C d' ZOd V N -I N 0 LL ) 0 D_ )IO E Co W O d a N pZ O Y co 0 < O O dC 7 > N N o a7Z a) '0 2 W 7 C a N E n d N Iu) C Nd 3 C 3 JO O 01 0 C CL ~` O O ^ N C a L- E UC r2YU - a) EC °c m N o E (1)) m ow o U m 0 CO F 2F f- Uo ~0 a W O I r IP 2_.% — vits S g\��\�jyj�s� THE STATE Alaska Oil and Gas • �w —s ��� 9lof .� T Conservation Commission N ��a� 1`lj� �J�!\l 1 }£ �� 333 West Seventh Avenue +2 1. GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 p Q, Main: 907.279.1433 ALAB� Fax: 907.276.7542 www.aogcc.alaska.gov Frank Roach Drilling Engineer BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU R-16A Permit to Drill Number: 215-185 Sundry Number: 316-105 Dear Mr. Roach: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, P Cathy P Foerster Chair DATED this i 0 day of February, 2016. RBDMS U k- FEB 1 1 2016 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug Perforations o Fracture Stimulate 0 Repair Well ❑ Operations shutdown❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tabing ❑ Change Approved Program Q - Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well 0 Alter Casing ® • Other 0 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: . 5. Permit to Drill Number: 215-185 3. Address: P.O.Box 196612 Anchorage,AK Exploratory ❑ Development Q 99519-6612 Stratigraphic 0 Service CI6. API Number 50-029-20686-01-00 • 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? 4 Will planned perforations require a spacing exception? Yes 0 No Q PBU R-16A . rii cr 9. Property Designation(Lease Number): 10. Field/Pools: FEB 0 5 2016 ADL 028279&028278 PRUDHOE BAY,PRUDHOE OIL ' .2:431A/ 11. PRESENT WELL CONDITION SUMMARYt-i(y-C Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): 11458 8825 11458 8825 2486 None None Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 35-115 35-115 Surface 2669 13-3/8" 34-2704 34-2678 4930 2670 Intermediate 6960 9-5/8" 30-6990 30-5854 6870 4760 Production Liner 4647 7" 6809-11458 5741 -8825 7240 5410 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): None None Packers and SSSV Type: No Packer Packers and SSSV MD(ft)and TVD(ft): No Packer No SSSV Installed No SSSV Installed 12.Attachments: Proposal Summary Q Wellbore Schematic Q 13.Well Class after proposed work: Detailed Operations Program 0 BOP Sketch Q Exploratory ❑ Stratigraphic 0 Development Q Service ❑ 14.Estimated Date for Commencing Operations: February 4,2016 15. Well Status after proposed work: Oil Q WINJ ❑ WDSPL ❑ Suspended ❑ 16.Verbal Approval: Date: 2/4/2016 GAS 0 WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: Guy Schwartz GINJ ❑ Op Shutdown 0 Abandoned 0 17.I hereby certify that the foregoing is true and the procedure approved herein will not Contact Sperry,Nathan be deviated from without prior written approval. Email Nathan.Sperry@bp.com Printed Name Frank Roach Title Drilling Engineer Signature /lt,r Phone +1 907 564 4373 Date(.7z/s7,9/4-00/6 COMMISSION USE ONLY Conditions of approval:Notify Commission so that a representative may witness Sundry Number: 3\l4. — \O5 Plug Integrity 0 BOP Test 8 Mechanical Integrity Test ❑ Location Clearance ❑ Other: 130P fc5ii- fo 3 SOD pS•i 4vinvIar prrye0trrJtr t to 2-5-7 ' p 5'i 9 Post Initial Injection MIT Req'd? Yes El No CJ' Spacing Exception Required? Yes 0 No I Subsequent Form Required: /Q — la 4 zoipAPPROVED BYTHE Approved by: COMMISSIONER COMMISSION Date: 2-/0., 4/ +IL z/ /a, 3" U '. NAL RBDMS LL FEi1 1 2016 Submit Form and Form 10-403 Revised 11/2015 Approved application is valid for 12 months from the date of approval. Attachmer<ts in Duplicate • S Lastufka, Joseph N Subject: FW: R-16A Change of Scope external-email: -1 From: Schwartz, Guy L (DOA) [mailto:guy.schwartz@alalaska.gov] Sent: Thursday, February 04, 2016 4:00 PM To: Sperry, Nathan Cc: Quick, Michael J (DOA); Lastufka, Joseph N; Roach, Frank Subject: RE: R-16A Change of Scope Nathan, You have verbal APPROVAL to proceed with the proposed plan as stated below. Please submit a 10-403 sundry as soon as possible with 1)alter casing and 2)change approved program boxes checked. Also,function/pressure test 80P as well as body test in step 12 below.Assume you will be changing the upper ram back to VBR rams(from 7") so would need to be tested anyway. Regards, Guy Schwartz Sr. Petroleum Engineer AOGCC 907-301-4533 cell 907-793-1226 office CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Guy Schwartz at(907-793-1226)or(Guv.schwartz@alaska.gov). From: Sperry, Nathan [mal Ito:Nathan.SperryCalbp.com] Sent: Thursday, February 04, 2016 3:31 PM To: Schwartz, Guy L (DOA) Cc: Quick, Michael J (DOA); Lastufka, Joseph N; Roach, Frank Subject: R-16A Change of Scope Guy, Here is our current proposed plan forward on R-16A. 1. E-line run USIT from 2850' to surface looking for TOC. (in progress) 2. E-line run 7" HES EZ Drill Plug and set in second full joint below TOL. If E-Line is unable to reach plug setting depth, run on drillpipe and displace to seawater. 3. Change upper rams from 2-7/8"x 5"VBR to 9-5/8"fixed rams and test with 9-5/8" test joint. 4. Run Baker 9-5/8"cut assembly. Cut 9-5/8" casing at depth determined by the USIT results. 5. Circulate arctic pack out of OA. POOH and lay down cutter BHA. 6. Back out lockdown screws, Spear and recover 9-5/8"casing. 1 • 7. CONTINGENCY: Run 13-3/ leanout assembly and polish 9-5/8" stub if the cut joint does not indicate a clean cut. 8. Change upper rams from 9-5/8"fixed rams to 7"fixed rams and test with a 7" test joint. 9. Run 7" 26#L-80 VT HC tie-back assembly. Once on bottom, displace 10.7 ppg LSND to 8.5 ppg seawater. 10. Pump 420 15.8ppg class G cement to surface(includes 40bbls excess). 11. Slack off 7" into the tie back extension. 12. Split stack and set slips. Install packoff and NU stack. Pressure test break and packoff to 250 psi low, 3,500 psi high. 13. MU 6-1/8" build assembly. RIH. Displace 8.5 ppg seawater to 8.6# FloPro. 14. Drill up the float and EZ drill plug. Drill to w/ in 15' of shoe and perform 7" integrity test as per well program. (Back on original PTD program) I've attached a 'current' schematic showing the status today and a proposed final schematic with the 7" tieback and the 4-1/2"tubing installed. Regards, Nathan Sperry Drilling Engineer 907-268-8416 From: Sperry, Nathan Sent: Thursday, February 04, 2016 10:36 AM To: Loepp, Victoria T(DOA) (victoria.loepp@ alaska.gov) Cc: Lastufka, Joseph N Subject: R-16A Change of Scope Hi Victoria, Parker 273 is on R-16A.We drilled our intermediate and successfully cemented it. We set our liner top packer and the system failed a pressure test. We ran in with an RTTS and identified that the leak is in the 9-5/8" above 1500'. We are currently running a USIT to find the TOC in the 9-5/8". We are proposing to cut and pull the 9-5/8" and then run a fully cemented 7" tieback from the 7"TOL at 6800'to surface. • Will you please reply as soon as you can to let us know if we need to submit a 10-403 for this change? Regards, Nathan Sperry Drilling Engineer 907-268-8416 2 0 TREE_' 4'C1" R-1 6A SAFETY NOTES:CEMENT SHEATH COVERS TBG TAIL. W91NfAD= MCEVOY "'4-112'CHROME TUBING AC1 U TOR= BAKER OKB_ELEI/= 50.7 BF.REV= _ 2245 ' KOP= 2000' Confirmed leak Max Angle= 51*ri,6700' above 1500' ' Estimated TOC in OA-2200'MD Datum M3= 11338' DaumTVD= 8800'SS with Arctic Pack to surface 2609' —9-5/8"DV PKR `` 13-3/8"CSG,72#,L-80 BUTT,D=12.347" — 2701' TOL 6,809'MD SI M. TOC 10,456' MD 7" 26#L-80 to 11,456'MD TOW 6990'-7007' TOC at 10,400' 10600' —TOP CF( iAT Estimated TOC- 10,479' MD/8195' TVD , • 10642' —14-1/2"PKR SINS NP,D=3.613" Base DPZ1 -6778' MD/5670' TVD VTop DPZ3 11,271' MD/8752' 1 e.•� s 41'* 10653' HMV ANCHOR LATCH ASSY,D=3.976" TOP OF r LNR —1 10702' 4 • •• ,4# 10664' —9-5/8'X 4-112"TW €BPR PKR,D=4.0" 10706' —14-1/2'PKR S WS NIP,D=3.813" 1, .. Ij 1 1 R 1 10726' —4-1/2"PKR SWN MP,I&LED TO 3.80'(12/05797)1 i . 1 11 .411 1 •. 11 , f . • 10738' —4-1/2"PKR WLEG,D=3.958" 4-1/2'TBG,12.64,13CR 80 TDS, H 10738' 1 • �1 4 10724' — ELMDTTLOGCD07/14/94 .0152 bpf,13=3.958" 4. 4 ' f •s 4. 1 • 10940' —I TOP OF SAND(TAGGED 08/09/15) 9-5/8"CSG,47#,L-80 BUTT,D=8.681'J--I 11233' }--- L 11. MILLED 3.3"HOLE THRU RESTRICTION * FROM 11231'CTM TO 11242'CTM(05/25/12) FERFORATION SUMI ARY 11301' —f MARI(E2 JOINT REF LOG:SWS-BH(S ON 01/31/82 • ' ANGLE AT TOP PERF:45° 7. 11278' 11337 ELMD —{EST COVENT CAP(11/29/11) Note:Refer to Production DB for historical pert data 0 0.E-0.0', SEE SPF ENTERVAL Opn/Sgz DATE MILLED 3.3"HOLE FROM 11368'-11382'CTM 3-3/8" 6 11278-11332 0 10/06/93 &C/OUT SAND TO 11466'CTD(5125/12) 3-3/8" 6 11444-11484 0 10/28/91 . 2' 4 `11484-11502 0 05/13/83 2" 4 11512-11534 05/13/83 0iqbe11479' FISH-2 BLADES FROM AWS •PERFS BELOW MLL®CMT CAP 1FULLBORE SPINNER-06/15/94 4-- 8 11727' —FISH-7"BOT HOOD PKR W/TALPPE, PBTD — 11975' 1— APFROX.89'LONG,10/19/91 1 11975' FISH-36'x 2-1/8"PER GUN 8 AUX TOOLS-04/29/88 7"LHR,26#,L-80 BUTT,.0383 bpf,D=6.276" H 12280' J--410 DATE REV BY OOMMENITS DATE WV BY COMMENTS PRLOHOE BAY MIT 02/07182 1418E ORIGINAL COMPLETION 05/20/15 AID LW?DEPTH CORRECTION WELL: 1:4•16 10/25/91 D-16 IaNO 05/20/15'JMG/PJC RESTRICTION/SAND URATES PERMT No:'1811740 11/28/01 RNrTP CORRECTIONS 09/03/15 jgr pre-sidetrack P&A _ API No: 50-029-20686-00 10/30/07 DLB/PJC DRAIM'lG CORRECTIONS 12/08/15 NS Amended PM Cement Bottom SEC 32,T121,R12E,1659'FSL&1711'FW. 12/16/11 ALM PJC SANDI CMT CAP(11/28-29/11) 06/07/12 RMHIJMD FCO(05/25/12) BPExpbration(Alaska) • • TREE=' 4118'SK 1MBLF6AD= MCEVOY PROPOSED p ET4 SAFETY NOTES: `*" -1/2-CMOMELBW** ACTUATOR= REV 3 R OB_EV=__.—.. 50.7' ELEV- Al i ►�+ 2100' 4-1/2"HES X NP,D=3-813" = --_22.4- KOP= 2000' Est. 9-5/8"stub at 2000' / i I /I Wax Angie an ;I Datum MD 4I�4• AI — 2609' -19-5/8'DV PKR • IliDatum TVD= 8800'SS a . GAS LFT MANDRELS 13-3/8"CSG,72#,L-80 BUTT,D=12.347" H 2701' I ST MD TVD DEV TYPE VLV LATCH FORT DATE 6 3720 1-1/2" L 5 5496 1-1/2' 4 6502 1-1/2" 7"26#L-80 VT HC tieback cemented to surface 3 7241 1" 2 7879 1" 1 8510 1" TOP OF 7"LIAR -I 6808' 6E108' -7"X4-1/2"HOT HGR 9-5/8"WHIPSTOCK(__/_ I__) --I 6990' w/11[BK,D= " 9-5/8"CSC,,47#,L-80 BUTT ID=8.681' -I 6990' PAL LOUT VVIM )W(R-16A) -699(Y-7007' r TOC( /. I ) - 10,453' .4 74 k4 4 �; 1, 11043' H4-112"HES X NP,ID=3.813' � 4• �4 •4 11 ''f'i kV•i 11073' -{7"X 4-1/2"HES TNT PKR,ID=3.856" • 1 ' 4-1/2"HES XNP,D=3.813" Minimum ID = 3.725" @ 11173' �o 11103H 4-1/2" HES XN NIPPLE 4I 11173' H4-1/2"HES XN NP,ID=3.725" I o4 "4 •4 •4 •4 4 11193' j-7"X 4-1/2"BKR HRD-E ZXP LTP 4-1/2"TBG,12.6#,13-CR VAM TOP, - 11193' late $ w/TESK,D=5.25" C. 0152 bpf,ID=3-958" �;j4 14 11193' H4-1/2"wLEG,ID=3.958" 4 °1 14+j 0'14 r1♦ i ,4; ,-�4 11208' 7"X 4-1/2"HES HGR,D=4.32" 1�4� -44 7"LM,26#,L-80 VAM TOP HC, --� -1 1' w • 1 �4 .0383 bpf,ID=6.276" . PERFORATION SULOAARY :1 •. REF LOG on / / r� 4 ANGLE ATTOPF43RF: 'C;... :4 .4 Note:Refer to Production D8 for historical pert data S SIZE SPF INTERVAL Opn/Sqz DATE • Pt3•TD 16887' ,.r•••••0 444j4 4 :44 V1,4 ,4 4-1/2"TBG,12.6#,13-CR HYD 521, --1 -15977' .0152 bpf,13=3.958" DATE REV BY C OMLENTS " DATE REV BY COLtENTS PR(.DHOE BAY MIT 02/07/82 N18E ORIGINAL COMPLETION VVELL R 16A 10/25/91 D-16 MO FERMIN,: / / ST(R-16A) API No: 50-029-20686-0 09/24/15 JMD B(.I._T PROPOSED SEC 32,T12N,R12E 1659'FSL&1711'RML 09/25/15 JR/AMD PROPOSED REV 2 02/04/16 NS Updated with CAP and 7"tieback BP Exploration(Alaska) • Parker 273 BOPE Schematic PARKER 273 BOP STACK RAM TYPE BCP: SHAFFER LXT DOUBLE BCP 13 5/8'-5M I DUTCH LOCK DOM FLANGE I 13 5/8"-5M STUDDED TOP i 13 5/8"-5M FLANGED BOTTOM V1/(2) 14" U12 OPERATOR, UPPER CAVlrr b al ANNULAR BOP: AND(2) 14"PSLK YOSTR OPERATOR, fn Mi Il LOWER CAVITY 4 13-5/r SHAFFER LXT 13 5/8"-51P 5M STUDDED TOP 0 13-5/8" 5M FLANGED BUIIOM 0 DRILLING CROSS: .1=- a C 13 5j8"-SM FLANGE)TOP _�'', a^ �,,� 13 5/8"-5M FLANGED BOTTOM C�.2 Vti o0 W(2) 3 1/8"-SM SDE OUTLETS _imomEgionommommi -atm„**. Mill •• 0.*ars " = :I 1' 1 KILL LINE �►i��� r l�l�lrl~G,'� � ,�' +I`I 2-1/16" 5M FLEX HOSE ��Li�Ilmo�i j• �� ltri � uht1..t +A 11��i � 2-1j16"SM X 3-1/8"5M D.S.A.'IL! 3-1/8" 5M FLANGED MANUAL GAZE VALVE • 3-1/8"5M FLANGE)HYDRAULIC GATE VALVE • q]; K.,••••qo oo AS. !,=�al niellil CHOKE LINE: 3-1 f8" 5M FLANGED MANUAL GATE VALVE _ RAM TYPE BCP: 3-1/8" 5M FLANGED HYDRAULIC GATE VALVE 13 SHA/ 5SM FL0�LXT SNG1E 1TOSPfB"5M 3-1/8" 5M FLEX HOSE 13 5/8"- 5M FLANGED BOTTOM W/(2)14"012 OPERATOR 1 Page 1 ‘,\of Ty • • THE STATE Alaska Oil and Gas �w - 7� o f J .ASKAL Conservation Commission 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 ITh'' Main: 907.279.1433 o�'ALAS�� Fax: 907.276.7542 www.aogcc.alaska.gov Ken Allen Engineering Team Lead BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool,PBU R-15A BP Exploration(Alaska), Inc. Permit No: 215-185 Surface Location: 1659' FSL, 1711' FWL, SEC. 32, T12N, R13E, UM Bottomhole Location: 1080' FSL, 4715' FWL, SEC. 28, T12N, R13E, UM Dear Mr. Allen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, alett7 Cathy P. Foerster Chair DATED this Lr) day of October, 2015. STATE OF ALASKA RECEIVED •.SKA OIL AND GAS CONSERVATION COMMIS PERMIT TO DRILL I�t�'tt't� OCT 0 9 2015 20 AAC 25.005 f 1a. Type of Work: 1b. Proposed Well Class: Development-Oil 0• Service-Winj D Single Zone f lc.Specify WI 4.,s Drill 0 Lateral 0 Stratigraphic Test 0 Development-Gas 0 Service-Supply 0 Multiple Zone 0 Colabed Gas u was 6 y.rates❑ Redrill El • Reentry 0 Exploratory 0 Service-WAG 0 Service-Disp 0 Geothermal 0 Shale Gas 0 2. Operator Name: 5. Bond . Blanket IT Single Well 0 11. Well Name and Number: BP Exploration(Alaska),Inc Bond No. 6194193 . PBU R-16A 3 Address: 6. Proposed Depth: 12. Field/Pool(s): P.O.Box 196612 Anchorage,AK 99519-6612 MD: 15951' • TVD: 9026' • PRUDHOE BAY,PRUDHOE OIL 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): r ADL 028279&028278 • Surface: 1659'FSL,1711'FWL,Sec.32,T12N,R13E,UM 8. Land Use Permit: 13. Approximate spud date: 170'FSL,1332'FWL,Sec.28,T12N,R13E,UM January 25,2016 Top of Productive Horizon: Total Depth: 1080'FSL,4715'FWL,Sec.28,T12N,R13E,UM 9. Acres in Property: 2459&2560 14.Distance to Nearest Property: 11250 - 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10. KB Elevation above MSL: 67.05 feet 15. Distance to Nearest Well Open to Surface:x- 635341 • y- 5978141 • Zone - ASP 4 GL Elevation above MSL: 20.1 feet 5 Same Pool: 561 16. Deviated wells: Kickoff Depth: 7100 • feet 17. Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 97 • degrees Downhole: 3374 • Surface: 2486 • 18. Casing Program: Specifications Top-Setting Depth-Bottom Cement Quantity,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 8.1/2 7" 26# L-80 VamTopHC 4484' 6950' 5829' 11434' . 8827' 242 sx Class'G' 6-1/8" 4-1/2" 12.# 13Cr85 Hvdril 561 4667' 11284' 8705' 15951' 9026' 564 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrili and Re-Entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effect.Depth MD(ft): Effect.Depth TVD(ft): Junk(measured): 12290 9536 ( 11446'(Sand) I 11466 I 8948 I 11479,11727,11975' Casing Length Size Cement Volume MD TVD Conductor/Structural 80 20" 8 cu yds Concrete 35-115 35-115 Surface 2669 13-3/8" 3720 cu ft Arctic Set II 34-2704 . 34-2678 Intermediate 11206 9-5/8" 190 cu ft Class'G',130 cu ft Arctic Set I 30-11236 30-8785 Production Liner 1578 7" 522 cu ft Class'G' 10702-12280 8408-9529 Perforation Depth MD(ft): 11278-11534 I Perforation Depth TVD(ft): 8815-8996 20.Attachments Property Plat 0 BOP Sketch EI Drilling Program El Time v.Depth Plot 0 Shallow Hazard Analysis 0 Diverter Sketch 0 Seabed Report 0 Drilling Fluid Program M 20 AAC 25.050 requirements R1 21.Verbal Approval: Commission Representative: Date 22.I hereby certify that the foregoing is true and correct. Contact Rose,John G(ASRC) Email John.G.Rose@bp.com Printed Name Ken Allen Title Engineering Team Lead Signature — Z.-'- —•-•- Phone +1 907 564 4366 Date /t/ 1p�,f,�j Commission Use Only / Permit to DrillPermit Approval Number: j1 / / API Number: 50- 029-20686-01-00 Date: 1 See cover letter for other 2_ � 'Q 1��"5 requirements: Conditions of approval: If box is checked,well may not be used to explore for,test,or produce coalbed methafle,gas hydrates,or gas contained in shales: la/ Other: r3 b p r,;r5 /- 3 500 p 5 r��r, Samples req'd: Yes 0 No I '// Mud log req'd: Yes 0 No E /`}vi/-J 146 Y p rc ve H h v 7 r5 ✓L"f 4 S m ures Yes IE/ No 0 Directional svy req'd: Yes LB`s No ❑ Spacing exception req'd: Yes LI No EM'' Inclination-only svy req'd: Yes 0 No I$ APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date:LO 'at --.1 C ORIGI AL Vr� `°/2 ?/`h Form 10-401 Revised 10/2012 This permit is valid for 24 months from the date of approval(20 AAC 25.005(g)) Submit Form and *'0, ' L, ' Attachments in, / Duplicate, • PP 4 To: Alaska Oil & Gas Conservation Commission From: John Rose, ODE Date: October 5, 2015 Re: R-16A Permit to Drill The R-16A well is scheduled to be spudded by Parker 273 in late January, 2016 as an Ivishak producer. The planned well will be a 2 string RST with new 8-1/2" hole being drilled from a 9-5/8" whipstock at -7100' MD to the TSGR casing point at 11,434' MD where a 7" drilling liner will be run and cemented prior to drilling the 6-1/8" production hole to the final well TD at 15,951' MD where a final solid 4-1/2" production liner will be run and fully cemented at that depth. The upper completion for this well will include 4-1/2" chrome tubing with a single production packer. The maximum anticipated surface pressure from the Ivishak sands with a full column of gas from TD to surface is 2486 psi assuming a 7.31 ppg pore pressure. This well will be drilled by Parker 273 using their 5,000 psi four preventer BOP stack (3 rams and an annular). The BOP rams and annular will be tested to 3500 psi. A detailed operations summary is included with the permit application. Below is a brief summary of planned drilling operations: 1. P&A the parent well with cement and make tubing cut per the Sundry request. 2. Move in and rig-up Parker 273. 3. NU and test BOP's. 4. Pull 4-1/2" tubing. 5. Make whipstock departure from the existing 9-5/8" surface casing at 7100' MD. 6. Drill 8-1/2" intermediate hole to TSGR at 11,434' MD. 7. Run 7" liner and cement to 1500' MD above the liner shoe. 8. Drill 6-1/8" horizontal production hole to TD at-15,951' MD. 9. Run and cement a 4-1/2" production liner. 10. Run 4-1/2" chrome completion tubing. 11. Rig down and move off the well. In addition to a planned well summary, a directional plan and proposed completion diagram is attached to the permit application. If there are any questions concerning information on R-16A, please do not hesitate to use the contact information below. John Rose Office: 907-564-5271 Cell: 907-748-5223 Email: rosel 1(bp.com Attachments: Well Schematic Directional Plan BOPE Equipment Schematics R-16A PTD Page 1 10/5/2015 • • Planned Well Summary Well R-16A Well Producer Target Ivishak Type Objective Z4 Current Status SI Estimated Start Date: 01/20/2016 Time to Complete: 35 Surface Northing Easting Offsets TRS Location 5978141 . 635341 ' 1659' FSL / 1711' FEL 12N 13E sec 32 - Northing Easting TVDss Offsets TRS TSAD 5982021 640160 -8872' 170' FSL / 1332' FWL 12N 13E sec 28 BHL 5982995 643522 -8959' 4199' FNL / 565' FEL 12N 13E sec 28 Planned 7100' MD/-5863' TVDss Planned TD: 15,951' MD /-8959' TVDss KOP: Rig: Parker 273 BF-RT: 46.95' RTE (ref MSL): 67.05' Directional — Schlumberger P10 KOP: 7100' MD Maximum Hole Angle: -59° in the 8-1/2" intermediate section -97° in the 6-1/8" production section Close Approach Wells: None. All offset wells pass BP Anti-collision Scan Criteria. Survey Program: 7100' MD to 7500' MD = GYD-GC-MS 7500' MD to 15,951' MD = MWD+IFR+MS-WOCA Nearest Property Line: 11,250' Nearest Well within Pool: 561' • R-16A PTD Page 2 10/7/2015 • II Formation Tops Estimated Formation Top Depth Uncertainty Formation (TVDss) (+/-TVD ft) Fluid Type(for sands) Surface Csg -2701 0 CM3 -5663 25 KOP -7100 _ 25 Water CM2 -6685 25 CM1 -6890 25 THRZ -7005 25 Possible Hydrocarbon BHRZ/LCU/TMLV -7118 25 TKNG -7502 25 TJF -7782 25 TJE -7973 25 TJD -8148 25 ' TJC -8444 25 TJB -8572 25 TJA -8657 25 TSGR -8756 25 Oil TSHU -8797 25 TSAD -8872 25 Oil 42N -8920 25 Oil TCLG -8978 25 Oil HOT -8959 25 Tar Casing/Tubing Program Hole Casing/ Wt/Ft Grade Conn Length Top (ft) Bottom (ft) Size Tbg O.D. (ft) MD/TVDss MD/TVDss 8-1/2" 7" 26# L-80 VT-HC 4484 6950/-5769 11,434/-8760 6-1/8" 4 'h" 12.6# 13Cr-85 Hydril 561 4667 _ 11,284/-8638 15,951/-8959 Tubing 4 '/" 12.6# 13Cr-85 VamTop 11,289 Surface 11,289/-8642 Mud Program Intermediate Mud Properties: LSND 8-1/2"hole section Depth Interval Density PV YP API FL HTHP FL MBT pH (PPM 7100' (KOP)—9231' 9.7-10.0 • 10- 15 18-25 6-10 NC <20 8.5-9.5 (THRZ) 9231' (THRZ)— 10.2-10.4 10- 15 18-25 <6 <10 cc's at - <20 8.5- 9.5 11,434' (7" Csg Pt) 200 deg F. Production Mud Properties: Solids-Free DIF 6-1/8" hole section Low Shear PV YP Depth Interval Density (cp) (Ib/00ft2) API FL Rate MBT pH (PlogViscosity 11,434'— 15,951' 8.5-9.1 • 6--10 10-20 <10 >15,000 <4 8.5 -9.5 R-16A PTD Page 3 10/5/2015 I • Logging Program 8-1/2"Intermediate: Sample Catchers-as required by Geology Drilling: Dir/GR/Res/PWD • Open Hole: None Cased Hole: None 6-1/8" Production: Sample Catchers-as required by Geology Drilling: Dir/GR/Res/Neu/Den . Open Hole: None Cased Hole: None Cement Program Casing Size 7", 26#, L-80 Liner Basis: Lead: None Tail: 1500' of open hole x 7" annulus +40% excess + 80 ft shoe track Tail TOC: -9934' MD (1500' MD above liner shoe) Total Cement Lead None Volume: _ Tail 50 bbls, 281 cuft, 242 sks of 15.8 ppg Class G, Yield: 1.17 ft3/sx Casing Size 4-1/2", 12.6#, 13CR85 Liner Basis: Lead: None Tail: 4517' of open hole x 4-1/2" annulus +40% excess + 150' of 4-1/2"x 7" annulus + 200' of 4" DP x 7" annulus + 80 ft shoe track Tail TOC: 1000' MD above casing shoe Total Cement Lead None Volume: Tail 116.7 bbls, 653.3 cuft, 563.5 sks of 15.8 ppg Class G, Yield: 1.17 ft3/sx (with gasblok) Surface Proximity Issues TBD Sub-Surface Proximity Issues 3 wells minor risked as follows: The F-37AL1 is a directional plan that is minor risk at 1:200 to preserve the targeted location and as this well should be in place when drilling this R-16A well, it will be SI at surface for the drill-by. R-16 is the parent well which will be P&A'ed below the KOP and is minor risk at 1:10. R-23A is minor risked at 1:200 and will be SI at surface for the drill-by. Hydrogen Sulfide R-Pad is considered an H2S site. Recent H2S data from the pad is as follows: Well Name H2S Level Reading Date Comments Parent Well(if sidetrack) R-16 24 ppm 2/16/14 #1 Closest SHL Well H2S Level R-17B 20 ppm 7/22/15 #2 Closest SHL Well H2S Level R-14 14 ppm 1/25/15 #1 Closest BHL Well H2S Level R-32A 12 ppm 4/13/97 #2 Closest BHL Well H2S Level R-18B 22 ppm 5/29/15 #3 Closest BHL Well H2S Level R-42 None New well #4 Closest BHL Well H2S Level R-23A 10 ppm 7/24/15 Max. Recorded H2S on Consistently Pad/Facility R-16 200 ppm 3/21/07 between 20-32 ppm since 2009 Other Relevant H2S Data Only R-09A is above 100 ppm since 2013. • (H2S alarms from rigs, ets. R-16A PTD Page 4 10/8/2015 �! i Faults Formation Where TVDss Throw direction Lost Circ Encounter Fault MD Intersect Intersect and Magnitude Uncertainty Potential +150/-100 ft. Ivishak 11860 -8977 50 ft.dt S MD Low-Medium Ivishak 12510 -8937 70 ft. dt N +/-100 ft. MD Low-Medium Ivishak 13620 -8967 25 ft. dt E +/-100 ft. MD Low-Medium Ivishak 14505 -8945 45 ft. dt W +/-100 ft. MD Low-Medium Ivishak 15310 -8926 20 ft. dt W +/-200 ft.MD Low-Medium Drilling Waste Disposal • There is no annular injection in this well. ' • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS-04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS-04 for injection. Haul Class I waste to DS-04 and/or Pad 3 for disposal/Contact the GPB Environmental Advisors (659-5893) for guidance. Well Control The 8-1/2"and the 6-W hole sections will be drilled with well control equipment consisting of 5,000 psi working pressure pipe rams (2), blind/shear rams, and annular preventer capable of handling the maximum potential surface pressures. Based upon calculations below, BOP equipment will be tested to 3500 psi. BOP test frequency for R-16A will be 14 days with function test every 7 days. Except in the event of a significant operational issue that may effect well integrity or pose safety concerns, an extension to the 14 day BOP test period should not be requested. 8-1/2"Intermediate Interval Maximum anticipated BHP 2041 psi at @ TSGR at 8761' TVDss (4.48 ppg EMW) Maximum surface pressure 1165 psi (.10 psi/ft gas gradient to surface) 42.7 bbls with the 14.8 ppg frac gradient that was achieved on the initial Kick tolerance R-16 13-3/8" shoe LOT assuming a 4.8 ppg pore pressure in the Sag River formation with a 10.3 ppg mud weight. Planned BOP test pressure Rams test to 3500 psi/250 psi Annular test to 3500 psi/250 psi Integrity Test—8-1/2" hole No LOT will be performed out of the 9-5/8"window. Will use the original 13-3/8" LOT was 14.8 ppg. 7" Casing Test 3500 psi surface pressure 6-1/8" Production Interval Maximum anticipated BHP 3374 psi at TSAD at 8877' TVDss (7.31 ppg EMW) Maximum surface pressure 2486 psi (.10 psi/ft gas gradient to surface) - Infinite with a minimum 8.9 ppg frac gradient. Assumes a 7.31 ppg PP + Kick tolerance .5 ppg kick intensity with an 8.5 ppg MW. Planned BOP test pressure Rams test to 3500 psi/250 psi Annular test to 3500 psi/250 psi Integrity Test—6-1/8" hole FIT after drilling 20'-50' of new hole, target an 8.9 ppg FIT. 4-1/2" Liner Top Packer 3500 psi surface pressure Test Planned completion fluids 8.5 ppg seawater/6.8 ppg diesel R-16A PTD Page 5 10/5/2015 O R-16A RST Operations Plan Pre-Rig Work: 1. Confirm injectivity to the open Sag/Ivishak perforations. 2. Place a 30 bbl cement plug from 11,466' MD to 10,600' MD to P&A the existing perforations and to provide DPZ isolation between DPZ1 and DPZ3. 3. D&T TOC and pressure test cement to 2500 psi. 4. Perform tubing punch above TOC at-10,500' MD. 5. Circulate T X IA to seawater and freeze protect the tubing and IA to 2200' MD with diesel. 6. Cut tubing at-7300' MD. 7. CMIT-TXIA to 3500 psi. 8. PPPOT-T to 5000 psi (IC pack-off fails). 9. Function LDS. 10. Install TWC and test(2000 psi from below/3500 from above). 11. Configure annular valves and install DHT. 12. Remove well house. 13. Level the pad and prepare location for rig move. Rig Operations: 1. MI/RU. 2. Nipple down tree. Nipple up BOPE and test to 250 psi low/3500 psi high (7" rams in the upper cavity and 2-7/8" x 5"VBR's in the lower ram cavit\y). 3. Pull TWC. 4. RU and pull the 4-1/2" 12.6#tubing from the pre-rig jet cut at-7300' MD. 5. PU 8-1/2" clean-out assembly and RIH to clean-out 9-5/8" casing to top tubing stub at 7300' MD (optional step based upon how clean the hole is to support the path-forward work). 6. RU E-line and RIH to set CIPB at-7125' MD using the CCL/GR logs to determine: a. KOP in CM3 ("competent" rock). b. Casing collar locations for setting the CIBP. 7. Test the CIBP to 3500 psi. 8. Change-out the 9-5/8" pack-off. 9. PU and RIH with 9-5/8" Baker bottom-trip anchor whipstock assembly and 8-1/2" window milling assembly (to include full gauge string mills). RIH to the top of the CIBP. Orient and set the whipstock. Shear-off the whipstock and displace the well to a LSND milling fluid. 10. Mill a window in the 9-5/8" casing at -7100' MD' to 7116' MD plus 20'-50' of new formation from mid-window and POOH for drilling BHA. (NOTE: There is no LOT planned on this departure from un-cemented 9-5/8" casing /will use the14.8 ppg LOT on 13-3/8" obtained 01/12/82.) 11. MU & RIH with 8-1/2" RSS BHA and PDC bit plus DIR/GR/RES/PWD and drill to the TSAG TD at 11,434' MD. 12. Circulate and condition the hole prior to TOH to run a 7" drilling liner. 13. Install 7" rams in upper ram cavity IF not already installed. 14. Run a 7", 26#, L-80 intermediate liner and cement to -1500' MD above the top of the 7" shoe (15.8 ppg class G cement). 15. Change out 7" rams to 2-7/8" x 5-1/2"VBR's and test to 250 psi/3,500 psi. 16. MU a 6-1/8" mud motor BHA with DIR/GR with a insert bit and RIH to the 7" landing collar and test the well to 3500 psi (cement to have reached 500 psi compressive strength). 17. Displace well to the planned 8.5 ppg DIF and run negative test on the 7" liner top (30 minute test- no flow). 18. Drill out the 7" shoe plus 20' of formation. Pull into the 7" shoe and perform an FIT. 19. Drill ahead and land the well at horizontal per the directional plan at -12,000' MD and POH for the lateral drilling BHA. 20. MU a 6-1/8" RSS BHA with triple combo logging and a PDC bit to drill the lateral section of the well to the planned TD at 15,951' MD. 21. Circulate hole clean, short trip as needed/MAD Pass where required. POOH. 22. MU and RIH to bottom with a 4-1/2", 12.6# liner from TD to 150' liner lap inside the 7" shoe. 23. Fully cement the liner to the TOL with 15.8 ppg Class G Latex cement. 24. Set liner top packer and displace well to 8.5 ppg seawater above the liner top. 25. After liner cement reaches 500 psi compressive strength, pressure test the liner/well to 3,500 psi for 30 minutes. 26. RU DPC perf guns, RIH and perforate (cement to have reached a compressive strength of 1000 psi). 27. RU and run 4-1/2", 12.6#, 13CR-85 Vam-Top completion. R-16A PTD Page 7 10/5/2015 • 28. Space out and make up tubing hanger. 29. Land the tubing hanger, and run in lock down screws. 30. Reverse circulate the well to clean seawater surface to surface w/corrosion inhibitor in annulus above the packer. 31. Drop ball and rod and set packer and individually test the tubing and annulus to 3,500 psi for 30 minutes (shear the shear valve in upper GLM). 32. Freeze protect the tubing and IA to —2000 TVD with diesel. 33. Set a TWC. 34. ND the BOPE. NU the tree and test to 5,000 psi. 35. Secure the well/ RDMO. Post-Rig Work: 1. Pull BPV 2. MIRU slickline. Pull the ball and rod/ RHC plug. Install generic GLM design 3. Install well-house and instrumentation and flowline. 4. Perform negative test on the 7" liner top. R-16A PTD Page 8 10/5/2015 • S R-16A Drilling Critical Issues POST THIS NOTICE IN THE DOGHOUSE I. Well Control / Reservoir Pressures: A. De-completion Work: Cased hole work/ no issues as the P&A/ DPZ isolation cement plugs will be in place and the well tested to 3500 psi. B. Intermediate Hole: 9.65 ppg PP from KOP to THRZ—Mud weight specification = minimum 9.7 ppg. • 4.48 — 9.8 ppg PP from THRZ to TSGR casing point — mud weight specification 10.3 ppg for shale stability. C. Production Hole: 4.48—7.31 ppg PP through the production hole— mud weight specification = minimum 8.5 ppg. II. Lost Circulation/Breathing A. Intermediate Hole: Breathing and/or lost circulation associated with excessive circulating pressures should be considered a possibility on this well. i B. Production Hole: Breathing and/or lost circulation is a risk with 5 fault crossings within this interval of the well. If lost circulation becomes a problem, follow the LCM decision tree provided in the drilling program. Utilize good hole cleaning practices to avoid high ECD and prevent pack-off potential which could induce losses. Ill. Integrity Testing Test Point Test Depth Test type EMW(lb/gal) Original LOT= 14.8 ppg = 9-5/8"window No LOT Planned LOT 42.7 bbls KT 7"shoe 20'-50'from the 7"shoe FIT 8.9 ppg minimum(infinite) IV. Hydrogen Sulfide (H2S) A. S-Pad is an H2S site. Recent H25 data from the pad is as follows: Parent Well(if sidetrack) S-42 66 9/25/2014 #1 Closest SHL Well H2S Level S-43 28 1/8/2015 #2 Closest SHL Well H2S Level S-41A 16 2/17/2013 #1 Closest BHL Well H2S Level S-15 None in Database Fault Separated #2 Closest BHL Well H2S Level S-16 10 6/8/2011 Fault Separated #3 Closest BHL Well H2S Level S-109 12 2/13/2014 #4 Closest BHL Well H2S Level S-118 10 1/19/2013 Max.Recorded H2S on Pad/Facility S-201 180 3/9/2012 Schrader Well Other Relevant H2S Data S-27B 140 ppm on 1/10/2012 (H2S alarms from rigs,etc.) V. Faults Formation Where Encounter Fault MD Intersect TVDss Intersect Throw Direction Uncertainty Lost Circ Potential and Magnitude Fault#1-Kuparuk production hole 10,050.0 6,653.0 West,30-50 ft. +/-200 ft.MD Medium VI. Anti-Collision Issues None. All offset wells pass BP Anti-collision Scan Criteria. • • CONSULT THE R-PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION. R-16A PTD Page 9 10/5/2015 0 0 TEE= 4-1/8'5K 1hBLi-FAO- MCEVOY R-16 A SAFETY TES: -""4.1/1-CII1MMME OMR-1 ACTUATOR• ____ -_ da3.B..EV•• 50-r PROPOSED 07 REV 2 11 109.4 BF.aev• 22.45' KOP= 7000 + " 2100' H4-1/2'HES XRP,D=3-813'I Oi1YT T1(d 8800'SSMgr1-I9 518'OV PXR I ) 44 OAS LFT WAN:FI LS 113-W CBG,728,L-00 BUTT,O=12.347 2707' I ST AO IVO IMV TYPE VLV LATCH PORT 047E 6 ' 3720 1-trr 5 5486 1-117 Minimum ID w 3325"e 11173' 3 6241 E02 1 1!r 4-1r2" HES XN NIPPLE 2 1879 1- i 1 8510 1' ITL1P OF r LNt H 61160' rogsr F7'X4-112'BOT HGR 0-SIB'M1 rooc t-1-1-)1- 7100' w I MK,D= • 9116'CBG,471,1410 BUTT,D=8-881" H -7100' I , IBLLOUT WINUOW IR-11A1 -110o•7016` 1 I r loc LJ_I-)H 0934' FI /, !, 0 1 11043' H4-1/2.HT23 X HP,D=3.813'I ►1 1 •1 /I ►, 11 1 ;1,. 1.-, :: 11073' 7'X 4-1/2'HES TNT PIOL D.3.868' 1 , !, '!1 11103' H4-1/2'I$X NV,I)=3.613'1 7•11i' 101 0 ,,4 ':i, 11173' 4-1/7 HES XN NP,D=3.725' ,1 I H 1 F/ 11 + ll 4 �, !1 �L 11193' 1--rX4-I?BKRFw EZXPITP 4-1/778,1288,13-CRVAMTOP, - 11193' 1' 7/ w/TS D=5.25' 4152 bpf,ID*31958" X11; ;'14 •1�' ► 1 11193' I r4-112'WLEG,D=3.95r 11' ji�4 I r 1 ELMO T7 LOGGED_/ r 1♦ ► 1 o1;4,. 1,0.44 11208' i--IT X 4-1/2'GOT HGF,O=4.37 1 113 ►4• 14 raft 268,L-60 VAM TOP HC, - -11434' 'i ►4 -0363 bpf,El=8-278' $ ► • FE FORATION SUIRARY ♦ 1 a ► REF LOG an JI •i 1 NOTE: The production liner wilt include 2 maker joints ANGLE ATTOP PERF:_"� WRiAtfootage Non:Pisfar b Produclon CR f«Aitorkal pa7f dale i spaced--1/3&2/3 of the liner. SIZE SPF INTERVAL Opn(Sgt DATE • ► a r s ► •� 1II I a. ► +/ • ► min 19971 "411011 ,► 41/7 MG,12.88,13-CR HY D 521, H 15851' • 0152 bpf,D.3958' DATE FEV BY COMBOS DATE REV BY- -._._.. COMBOS Fi UCHOE BAY/.BIT tSl07R2 N18E PICINI&COYPLE710N %E L: R-16A 10/2641 D-il RMO FERRY No; _I_I` ST ff418A) API No: 5402920686-01 00/24/15 Jb0 am T r4if)IY11tET) SEC 32,T12N,R12E,1650'1$L 5 1711'PAL 08725(15 J'.W'RIOFOSPORHI 2 BPExploration(Alaska) R-16A PTD Page 10 10/5/2015 III M 0 01F03'— m'-N•-M ,N000 O V N 'r Nm 0n 0)U)0 m mm Q 0) C 0 0,3,01- M N N M r 0000,e- '-n n m C 0 ,)00) v m r Q m mM N m.- 66666 M M 0 a, 6,=66 ? M 0,. aVV0r 0 + Q0 000 Nm0 mVON mmmmm 000c-N NNMV0 mpNNN MM• VV vmmm 2W nnnrnmmmm mmmmmmmommmOmmmmoon,yMMMM MMMMMMMMMM MMMMM mmmmm 7MMM d (ommmm mmmmm mmmmm 0(000(0 mmComm ,0000 Q M ri m DC- n M V m 0 m 0 r m 0000-0 0 mN O 000 m0 0 ,00 O C0 00OV(ONM NOnO mo 00M0 MO 0) 0 N L D a r,-(O t` 4,166.- OQt0M 6,-,66, ,a5,-:66 <p r m N Y mfp mn OQnOM MNm�t0 Otom M me-( m m'-0 N O pp 0)000 000,-e- _ N N Nto m nn n m m m 0 m OO O O O O O O 00000 00000 O p 0 0 p 0 0 p 0 0 p 0 O 2 r n n n n 00000 00(000 0(000(0 00(000 m m 0 m m mmmmm O m O m mmmmm m o)0 0 0) m O m 0 O 0 0 0 0 (0(00(0(0 m 0 N m m tO (0(00(0(0 (00)0(00) 0(00)0)0 000)0) 7, X p m CO n n O N m m'- N V n O N Q O M 0<0 r O O M o,0000 C d V V V V Q V mm)OU 000W, nm000 mm O)OO mM010, O C to NMN ui COmN mN 66MM 6 0)0)0mm to 66,6M6 ,666 d D 85 E O m- ,<,.. ..... 0 0 0 0 0 O p p O O p 0 0 p... ,gm-,..a N m 0))()Y) )O u')mN m 0000 0to tO t0 i00 tom mt0 0 o p p O N O M M M M M CO MMM M CO O O M, CO6 6,6 M ,O M M m. LL o J J(Y „ (Y„,,mY,, J JJJ J (O(0JJ J J J JJJ J JJ J •- F- d'pm=O n(p N Q N M mr mt0 = mNO m rN tN tm0 (p mm M I N Q n —.h. - h i0 N m m d (7 m M 6 M m 66.-6, m m m� 66,,M.- r m m M E C mmm(O 07 OOOmm V V^ V V^V ,mom a m m N vc m0m M m D o MM o 0 d z m m m C N ' ,mMrO MNm'V M(mOcmOpm00m) nOV)m0m O��m- NmMm <L Jd O O CO ~ W”" t7 M Oi Oi M m t` O Q fri t0 N Q N M M Oj Q M M 0 ,,,-6 U Imo n N N V m M o L U M m Nmm or-mm.- mNm N N(O CO N M C O Om)m OO e-'0 N N N MM (¢0 E . O Fm MO CO " a N Lp• N CO N N N N N N N N N N N N M M M MMM MM '0'0 p V V y V V d. E 0 0 0,- .- N X N O 0 O d o O O oOm 0,0 20 p)d 2 0 0 mY (n0 N m e-O 0 m ❑ 0 F-O C> e- CDEL ''. 0 O n m M m m O M m N 0 O r 0V0 O' ONm NONN-nOmmN '0Ommm m m 0 0M z= (7N Co N-R n664, ton V meLUnh V to OO 0j000 C O o nn00 mm M V)0001 ON-Ory m0 00 mQOV (Corrnr mmmWW 666 00 O0,Vmo mmmmm COrrm CO Q L Z NN N N N N N N N N N N N N N N p m0 �/ C L C d 2 F W L E C22 O F-•O � C g d ✓ cE O1m > ELI m ei o 0 ❑ Q +' N an d -o d 08 p m. OQ O Q W O C d 2 G 111 C g C Z d V 1 ,.NfVON M°r)N(mom ONMN)(o V eN-(Np MOO MlO p,W ptnn MI,M) d d IL d (O d OI W t') ("I ("1 th U 0 0 () d q V O.C) O C �m > ' mO m W W WOM MrNrM mt700� •-OIMQLn h•-Mo Q CAI J )) 5 5 d o S c 'c c o y dfa > mry0000 Q�M�a (C)imn�n� CO(m,io(mph nm�rnm �oom O W O mn mO W V A g Y 0 U L C `O O N M M M M CO M M M M M M M M M M V Q Q V '0'0o.'0'0 ,000 to• to m u u K K c 6 z.z c 5 c L V V U 'c di o• Q IA >= pm(7mn O'NNV m(mOmam (pN0NOp C-C)pp0OM p OO V ED Q F- 0 V OON • Oimm 000N6 6N0)O^ NNN0 V (0000 m O 0)N M V t0 0000,- CO 0 N n N n t0 0 M u) 010,1-00 m m M O 0 r 0 0 0 0 0 0 N N N M M V '0N-m O m 000N(0)0 L 00000 100000 00000 m(000 t0 mn n rn r rn r 'O 0 3 ` 0 0/� O m m N 0 V O N M O 0 O M N m O p M n p m m p M 0 p N M M U) m y . o- p n N M O M,(O N V 0 0 0 V m M O N r 0 O V O m m p M O V 0Aeoc 6,666 Q Q N c6 0)N M m(O W W N m p W O W W m Oi M,- < • (0 0 m n m N m V 0 u0 00000 O 0 M m m N m p Q ^•-030,1. (0 m m m m 00300A- N 0 N M M V t0 0 m m 0000.- N-N M ._ (000(0(0 00000 00000 m(0mm(0 00 n n r n r r r rLL N m 1 Wow .. p' Q m 0 d o N O m m m Q N m m M M m n 0 n n n n m M t7 n n tp m m m O V m ` ,m m m m M M N O m m N e-0 0 O O O t0 n N m O A-N N O m O 0 0 t0;, 0. F- tt)mmnn O V cO M 64O6,-, M,MML6 4.--,..:66 w6c6W 5 14 O m m m t0 m m m m m n n n m m m to m m n 0)0)0)0)0 •F Q M M a a1 0Nzom E_I�� N 44 C '0 M O OO a W Lc; 1116 m m o • (n ym D N- 0 C_ n_ V 0 0 mp N ,000 mN 'E ZS L NWN . V MN-m mOOn ON0 NyNNp NMr OVO) N (0 fNOYv. O oOO«« NMmnm 0 0 0 0 0 m,O n= V pmm hMOr N 00 N M tm0mm mmmm0 m0m00 mtot0mto tOMtoQQ pQQM � V a Doaa • Qov oo —Er- N ° N N• -C _, 0 c N (a0 0 F m M m N n .d- mo - pa) (QnQ .0mM • (Oma` M atOELmMzzzC-0N 00000 00000 00000 0-0,000. 00(000 0000 2 . m V 0 0 0 00000 00000 '0(0000 00600 (0000 0 o(ri(O OOOOO MOOOO ciNOO(p OO6OO mmmm E m m o 00000 M0000 M,M O m 00(")00 0000 n0 NM V mm 0,000 000,0, A-NNMQ ,c0 W, p m pi (o r 1r r n r r r n n n n n n m m m m m m mmmmm 0 0 0 0 m N K y " O d O d x r d N w C OI - N m -60 -2 ,1,2.E J Z j u t alCII O d .. O d - m c m.V.. U (U :: w E :: m J �yU ma CO m 20 0 0 7G 0II d d 2 C1 = C C 9 N j GL O_ O O J 0 L m y Q ?2 «C7m o 0E1 mL�� to Z to n m>, 6 d▪ 7 - C O U C)m D E ")-0.H°) M V N M CC = N _ ,C o • d d o a m m o 0 0 0 O d O O d O d Z 2 cO 2 M U iLL N �m Q 6 M F- U J J U V' > 0 O H F-0 0 U W O O 0 , 0 0 411 III M 0 N a) 0:20 o CO m O W U)N O V C)O O V N U)M V M CA 00 V N 0 ,,,woo(-. M 0 0 Ch 0 0 W CD 0 V V 0 V N 0 0 N O W 0 W m C 0 lO7-00, LOON0Ch NOON W 000N V ON 0O,- p 000•- 000400 00,V7-(p000p(0 N)O7-C 0 CC :C foo tO CWp CCD V O p0p pOp pnp'� W NM U) 0 CWO ap 0CC 0 7-^f,N N 04 N N W W I-N000 )U)NO0 CC CC 0,-,- 000 W 00 W a W V rn 0 CC W 00i) :11.44..T.7. p O O p ..... o p o o )p.7-VPI-,_7-,,o p ao 0 00y 0 0 0 0 p o 0 0 0 p0p o O p o yOy o y 0y 0 0 CO y Oy yyo Ch Ch V V O O COMOMOCMOIMO CMO fMD 00 tVDtVDtVD tV0fV0 fV0.tV0 0(.0000 CO 00.CVO 0.CVO CVO CO 0CV00 f00{O�� 000 CO 00 .....VVCVO ,i- „,M C) Lr, p0�1 N a,U)N N N. 00N O,- N V 0 W O U)V N O, 0Oth N V OOO N O 0 MNN0 O M V W,- N000p NN000 V 0 C N O V 00 V 000 W 0µV W O CON N 0 0MUN•- 0047-7-N 0.00N7- ONOO W NUQU)N 7-7-001N N Z B 0 C)0 Oj 10? 06000 O)f0 O C)U)'-f') M t')N C) nj 01 7 O .-6001.-: 6066N: M,-�1p(y 00466 M N .e= `- W O C h U!t 0 V N N M C) N,01'7,- N C)N'-f 0 0000,- V 0 0 N 0 0000.0 O O W M W N N f 0 W O O W O V V N_ O ^v' ^W W 0') W 0000 0007-7- NNNM M d.t0000 N W W 0O) 007-7-N C)N NN N NNN NN N 2 W W O0 W O 0000 W O W W O W m 0000000 02200 mm m m 2 002000 000000 02000 mm W 00 m iii h h Wm om N00p0mN.NN � WW . .m . .00 0 f 2 0 mUU) Ch mOh0 O . UUUN ) 0U . UDmh . . . Y9 0qUmm m CDO 00000 00000 0000W p'V NNNNOC+NNMWOQQ&CO0mMm0 UU)UU) O00O O co WCOOCOCO COCOOWCO 660WW OOCOOO ONCOWW <60660 000,60 00000 000,6,6 00000 COC 2Z. V., E O Co—. o 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 0 J s O 00000 00000 00000 U)O U)O U) 00.300 00000 00000 OOOOO 00000 00000 0 o O C) C)C]O o O O o p O 0 O O m W W K N N N C. N ri A N N 00000 000Q 66666 OOO00 64444 V w u J W o(no(n W CC W W (0(00)M-' -J-'-J-'-J JJ W J fqd' yd'MMECd' M W M W'd' (2��d'WWw 0_'d'd'0_'D_' UJ /-- t2 ... ____ ___ _ _ = t00 1') I N 0 0 W= =O W=A O!O W v- N O 0,N N m=__ N-N-OW)00 O = O V V N Co W Uj V C)C)M /I 0 O M 17 N 0)N (V'- V V V V U) M M t')C)NNN NNNN 1010 0 00000 000 0 00 V V V E. 7 N V M) 0 0-0 0N,-MV 0oa M Va0CM NONWV MN WaOCOO•-NO000000 N 0 OUO mW N 0.. O af00 OCaOO 0OONUOD C0 D ^DN. N '001 '00O0 'UU •-N NU0UO ON ,:, N000W, 00Na- 0Mf01- OVV ]C7 M.-NV C a WVR00N000W0W10OW 00000 0g004'6 7-7- NV0nMVVNNNN aM M,7,00 , 0 0000 2p0m0 0OW 0000)O) O)0MpO 0NN 0COV VVVVV VVVVaVVVVV VVVVV VV }VV VV VVV VVO OOOOUU)OUO10 OWWW ;L- W W Cn N V OC W ON N V O'a- O V N0M 0.00W.1 U)CNWN O0NN00 V'-C 0OONNN 0•-Na-V NN N •- 00 CL 2..0 .4. 0 0000 U)a-O'N NON'-'- 03,00N NU)O M N lrMNN V N O MO0 0 V V W 0 NM0No) 7-ONN0 V O M(ON)O 0N.000 a=W a'W OV CO`-R V C)0 M•- N0•-V O Of010U) . 06O� 4,-6N.4 N.7-•-O0 0 C 0 ,-.”--64 O)V o 0 C)V 0 0)0 V W N N C O C)N W N N 0 0 N N�OCp 1-O W p7-M000p ppN M M N,- 00000 W CC N N NC)CN)CM' 0)C0')CO)M M C')MCN')MM rN')CWM 0)NC0) C0h V V aa, ae v Oa v 7 V vv V V V V C00 ONUO)UU))Up) U0)UO)Co0C007 v W Q a = Ov-0Ou,0ONNOWV0 ' N0WWVOONWNCIsrNN0-OpNW M0nC0 COU) O) OC0 .ONOCUDO OOU VCOOO0)NUO U - CO NNONOO W0' .0OOrN0Vo0 '?0.7- 00Mm4 -N00 .pMM {-pNNO O O00 ( 0OV+ DyU00 04 01O VCh ) MNCN0 V ' 0 0COUh00 Om0mm200Wm00NNN,, NNNNW02UDDooO 00000 m0 000ON NNN C D >, O N 7-0000 00U)0t0) 0M0NU CO W COMU) 07-000 007-N0 07-0O)M W ON M V M000t0 a 000C)0 V m > .- ,0 70000 00000 v7V00,0 00000 0017-N 0N7-MW M MO V' 0 a-W OO MNN o V 0'-000 0 C- W a-Ojoi000 a-O,QNC) ^m V ON CNC.W 10 0 V?M N C0-(ON0 664,4 'C7 V O0) C)CO W CO ai NN77 O 0 W •-m,,, C)N N N N M O N M 0,000N M V V V V N7-000 00000 00000 N 0) V V V V V V 0 V Mu-,00N U)O N 0 O 00000 0)0000 00000. 00000 00000 00000 00000 00000 0 L N N N N 0O 00000 00000 000030 00000 00000 0000)0 00000 0000)0 00000 0 2 a` N N 00000 00000 000 N O 0 0 0 W 0 7-N000 0 0 N O M007$.0 000400 W V 0 0 0 .M O N U) 0 W 0 W 00000 00000 00000 0.0..0 ' WC00' 000.MO MN.,/,1.0 OOW V 0 NNP-ON O•-000 W n NNNNm 00000000 000000000 200%02 02200 20000 000002200 2200000 1,33',4D0022 00000 2 Or' 0 0 0 00 0 0 0 0 00000 0000 N 0 a”-N O 00 V N N 00000 00000 O O M C)C) M 0 O N U) 0 2— q Co000 OO000 0000. 000 tO ,v,-(0.o. p 0O NN MMM M N 00!c40.101 NNMMC) M M O M a- •- I- OOOOO C]C]C]O C] 666d60)(0010 N W?O•-•- a-a-0i Of 0 N,- n.-,-,-,- (V N('j NNOU')W 0 NE M M C)C C' C' 0)0)1')C') ChM C)MC) NNN•-a- 0(0M aCNM M V OON mmOO)O) 00000 0 • y^ N 00000 00000 007,0V 000040 7 g 0 M 0 000 V V O M V N V O M O O M O M M C) M W O N V C'°_+ W 00000 00000 0 0 0 0 7-M N C O N 0 C) N C h p N O p O 0 N N N O M C)•- O W M W M 00000 OO0Mr- CO OO Uj Ui Mi U) U)U)U)CO Uj U)O C:O OUj OD N M 0 04 0 U)N ^N N O O 00660 0 0 0)0 0 N N N 1.:K N N O O C) C) M M M C)C)C) C)C)MMC) C)MC)M V ',vino, NO0)00 0)0000 00000 00000 00000 00000 0 000 00000 C h 0)t 0 0 a' ON.O N 00000 0000 M C O MOM O 00000 00000 00 N N 0 1--07-00 W 2= 0 0 C) C)Q 0)00)004 N 0)N O N 00N074. 0p O0 003007- 00000 00000 O O N N 0 00000 O O N CoUC)CO Coe+Op N-Cj a+NO)ON ooNON 0ljaf ON ON 0 Ci Oi 00000 x0000 000000 NC0000 o N O)V N O V O o N N C)7 N O N mono, O t 0 0 0 0 p O O N N 000,-0 00000 007-NN 00000 O W W W N V O O N P V^ 'V^U)U!) U)W CCO N N 00000 O'-NNN M V CO U)O O N 0 0 0 N N V O N-0000 0 0 0 0 0 0 0 ..... ..... ...... N NNN N N NNN N N NNN M M M M C)C) M MMM V V 0 N r- .U) W N m p Oo CC H W O Cn O! 0 N 0 M 0 E 00 �)0 hm� 0 c2i �� F "' v m E cY»-, -1m�E, VL-c0 2 cO N O m o c 2 22 o C m 2 0 W1-1-1-1- 1-1-1-1-1- NUN 0 I- V Z 1L0 W 0 WO U_ 0 W 1L 0 0 1L 0 M 0 01 co co O`Cr O CO C`0 N O N CO CO O 0 m C CO 0 opr 0 O7 CO MCO O NON CO O P u) u)V o CO ui 7 N N LL N v)0)N0 0)0000N Nn rNN N W '-N N CON CO N NN NNNN CON a).p.0 O 0 0 O R O 0 0 0 0 0 O d CO CO 0 0 CO 0(0 0 Co l0 to O O CO co Ih N O0 OCI O N CO OO CO LO u) O C y OCC u)CO ON Ne'CO 004 u)n O L oi6 n0 ci ci m •-co 6 c 6 N It CO Ny COC- •-0000 OOOOiCP 6 03 Mty co co C)NO C)N)C) NN N)NN N Z 00000 000300•003 000f000 0 0(0)00 00)00)0 00000 0 CO C-LO u7 0 u)0 CO 0 0 u)u)u)u) u) i (C {p^Of 0) O)00et CO C3N000 0 d Cp Cp 03 CO CO 0-r N-N- n N-N-a0O 0 o CO CO(0 CO ro ro ro CO ro CO CO CO CO 6 CO 3 T d r o e, y O O C o 00000 OOOOO O 0 0 0 0 00000 00000 0 o a O a 000N NN NOO CON ui ui ui O LL e C7COd'iX 2'D_'000- NNNJ(O ==N N C9 COel 01 =CO N N N N' of of ni ai r 0ofof Di Co tO 0 C •-7 7 7 CO Nn CO CNC CO CCOO 00.00 N CO CO CO 01 N N N N Co O N N CO O O 0- (0(0COCO0 n r n r r r N-0 CC 0 a0 CO CO to pp�� CD 2 el. 00 0�0 Cn 0NO lD LC)0 W O) 0 CL 0 CO O Oi et O co 404 NN 06 tri 0 0 N h O)Co m t`n DCO OMN OO Otp) R O O< co co V,R C V V Q V O a 0 {Cpp � W rnm N.W OMO0O L077010) m 0) 0)C:O)0 6 6 O t CO CO 0 W Oi sr O ^N NCC N0 CON 0) CO CO NN6 O 0 0000 00 LD COO CCOO 00) ON)ON)W W W N C 0 T _ CO in Oar co O n CO C j)7 O ti C O 7 V O CO CC Cti N CV O ai m pi o o o m ui 6 CO OO O(ACA A O) 0100)77 N 0 OOOO O CD CO aCO 0)0)0 OO O L a a CO CO m CO CO pp‘1,3 Co co Co 00 0 2 y 0000 CD 03 CO{D 8 C)CD CO CO O CamN CD me' on6(o(pp co o CCOjV MM co CO fp CO NNt")QO cri LO T a O)0) CO O)CO O) CO W 0,0 0 0000 CO CO COa Cp C0 C003000:10 El 00 00 e`.. ZS!02 q 5 S3S3O n C S3S3CO ~ oS co q OaDi DOl 0 0)0)m a N Oa)Off)O 0)W 0 CO E ^ ^'N-0 000000 000000 CO E''.. O 0 oC-u)u1 0000(0 CD as rnrn CA 0)m a0) CP COLOcci� Cp 0 • m 0 O^+ N000 pp' N 0000 CO 01000 0 0 1 0 C O O O O N 01 of h oo OOaom -i00000 NO• Op)O N-O NC�C��O N OOOO 0 µ?O V 70 co CO i) COO.1 0000 u0) cs N n DD N 0) y U m a o F 0 o v 0 E o U h v Tg m N 1_ v9 a uU H W LLU m W 0 • � o e.. di o Add (/) ' _ ClM. 1 I a a Jai a o :i i r- < o E aEL co = Ce o l Cd a C ~ i i ii i i o U y H L wco I O a a o - i. 0 $of on Q o f: Z E i'�_I I o O _ ck K i b* E II (o' o m �8 .E d. () 1 4 1 O a �.: O O O O O cc) © O O 0 O O O O 0 0 0 ('0D On r co W C' W 0 as• d A II N CD r O z� .?I i i F (I) w'R O O is LL i e rn o d a 8'a! II ' 'C LL 8 ;m' E $ g 8 ?,2 m 2 h zr' o < awl !. LL ^„ a �F, cc oNN .i... !. ! ! ! mo_O ✓ J > ,! i I ! i s i i zF �_ N i. i i i i i• i ...rd i ... ... I W • N i O 1 1 1 (/) f!! i i ._ m lL y) I I I i • � A�Ub �`a � � r ERF* _ $fLO CO ' N i/.! �� '� in i i! i i > 8 I o it .. i i (3s m c = ; - f o o di m ._ tX 1 0 0 A C to Z W �a� C0 Z V hst !a d4 ! ' II ai O 'o mv' try LL'Pv ¢ S n 8ian i u� i A. 00 'p) a 0 n = co m r ..� zr - u. `w 0 r o Z 7i a _p O ��./ J O Y. v 8f co n2 j J J r f, O i i i i i' ,f,§ V Ao a u .e _a i, i I I i iNF; - a I m in .. 'afi ii a I 78 7 _o 8 E! IE g h gi g''N Q o 2-! �. :" �" v cm m E 0 0 0 O� 00 I I U Oa Si c0 W i N o (4)009.I.=ahS(8)Onl o TO u C !. i i. i O i i. N 7 �f v IIS) LL w > T N re 8 1 $ O U of i m i ci W i i i ��yy I SQL0 0 x ..__. o x o EL F,,• , m yi a ; T (n it n v n8 3E CD E • it INi p0 94 a F'� Q "8 $ i tom'!�ppp2'7 sno co =• m "w' 9 9 P 'ay F b V !m K ::04 0 d io m a ! an o oon o g o 000 0 T_ w (o (o r r m m a, FL) i a rn o 6- f . (8)008!I.=ahS(8)Onl • 0 _ I al Ci 2 0 Lo _ co \ ` ■ : `| :� E _ ») �� I ! / 311 g co ■_ ] $ Ul GO / °rr ! } ° i )r II g � � - ~ / / . \ \ am A k w § !! §§ o 1ti i -| i| ii \ / Loco M 7 j \ �l - ;! | | k ; - i m . A ) - 2 k . ° /| co IL } el- E . ! ! _ {\ �) ; j .../ \ _ to E - ® ^ 2 G /\ r ® \ © © ; l, /! "-- - $ ; ] - ati - \ w \ \ � o / ' _ft/41111k � iv, 1 � _ _ ! \ . 1 _ $ e 3 ; | ! ` ( ` - ` § ! CL ,p, N \ \\ \ / . 3 3 ' _ o _ �: )| °f ; \ - . .. .. . /; * | : - : - cii \ 1 ; j k ..,2n . . . 11 (§ � , 2 8 § / § k - _ ,_ o « § LI `r \ ~ CD | \: .° } !! Et , I I kI I G / / 0 0 1 r) 0 0 0 0 0 0 . }!! ; r .4- r n0 ! a ! m ! 2m - &o;=elan V m $ gk ' • - u- -) n U) _ r- -- a U) 61h, Q co Lc) _ n ¢ - u) —n _ -- o u, _ n -- U) N _ r- - -- O O d C co to - n to - o - O c, _ n • CL - 0 - u,- d N M - n U) CE 2 O -- U) n N n _ n -- U) - N -- O CO Q - N T- n T m _ oro ro - u, o0- cc it n 00 cd cC - CLdCCCl_Q_ •. •. •• •. o - N— 4) C ___ __-_ U) G) - Lc) I I i I I I I I I I I , I I I I f I I I I I I I I I I I I I , I I I I I I I I I I I I I I , I I I 11111111 III 1 1 1 1 1 , 1 0 in o o o in o o in o o co U) U7 1.r1 V (7 M N N r (ui/usn p1.) uoi}eJedeg aJlua3 ai uao • • BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well R-16 Project: Prudhoe Bay TVD Reference: R-16A(§67.05usft(rigx) Reference Site: PB R Pad MD Reference: R-16A©67.05usft(rigx) Site Error: 0.00usft North Reference: True Reference Well: R-16 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore Plan R-16A Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan#10 R-16A Offset TVD Reference: Offset Datum Reference Plan#10 R-16A Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of reference Interpolation Method: MD Interval 5.00usft Error Model: ISCWSA Depth Range: 7,091.40 to 15,951.38usft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,790.44usft Error Surface: Elliptical Conic Survey Tool Program Date 9/23/2015 From To (usft) (usft) Survey(Wellbore) Tool Name Description 116.40 7,091.40 R-16 Sryy 2 GYD-CT-CMS(R-16) GYD-CT-CMS Gyrodata cont.casing m/s 7,091.40 7,100.00 Plan CO R-16A(Plan R-16A) GYD-CT-CMS Gyrodata cont.casing m/s 7,100.00 7,500.00 Plan#10 R-16A(Plan R-16A) INC+TREND Inclinometer+known azi trend 7,100.00 7,500.00 Plan#10 R-16A(Plan R-16A) GYD-GC-MS Gyrodata gyrocompassing m/s 7,500.00 9,000.00 Plan CO R-16A(Plan R-16A) MWD MWD-Standard 7,500.00 11,430.00 Plan#10 R-16A(Plan R-16A) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 11,430.00 12,160.00 Plan#10 R-16A(Plan R-16A) MWD MWD-Standard 11,430.00 12,160.00 Plan#10 R-16A(Plan R-16A) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 12,160.00 13,660.00 Plan#10 R-16A(Plan R-16A) MWD MWD-Standard 12,160.00 15,951.38 Plan#10 R-16A(Plan R-16A) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) EX PR331213 PR331213-PR331213-PR331213 Out of range PB F Pad F-37-F-37A-Plan#10b F-37A 14,698.05 19,205.00 583.02 277.10 307.99 Pass-Major Risk F-37-F-37AL1-Plan#9b F-37AL 14,669.70 19,155.00 75.59 44.68 44.21 Pass-Minor 1/200 PB R Pad Plan R-44-Plan R-44-Plan#6b R-44 Out of range R-06-R-06A-R-06A 10,919.78 12,308.00 1,058.56 619.33 918.32 Pass-Major Risk R-16-R-16-R-16 7,146.36 7,130.00 1.50 3.90 -2.29 FAIL-Minor 1/10 R-17-R-17-R-17 7,092.78 7,500.00 1,256.96 468.20 838.01 Pass-Major Risk R-17-R-17A-R-17A 7,094.12 7,500.00 1,257.33 468.37 838.22 Pass-Major Risk R-18-R-18-R-18 Out of range R-18-R-18A-R-18A Out of range R-18-R-18B-R-18B 12,332.39 13,280.00 872.83 363.78 518.13 Pass-Major Risk R-19-R-19-R-19 Out of range R-22-R-22-R-22 7,400.14 7,535.00 1,305.59 362.66 989.48 Pass-Major Risk R-22-R-22A-R-22A 11,002.57 11,595.00 792.34 204.47 644.15 Pass-Major Risk R-22-R-22AL1-R-22AL1 10,936.90 11,605.00 793.75 203.52 690.60 Pass-Major Risk R-23-R-23A-R-23A 12,315.48 15,225.00 172.65 60.59 128.14 Pass-Minor 1/200 R-32-R-32A-R-32A 15,948.11 14,930.00 616.45 453.51 184.00 Pass-Major Risk R-40-R-40-R-40 Out of range R-40-R-40PB1-R-40PB1 Out of range R-42-R-42-R-42 10,028.61 9,785.00 562.40 198.58 446.29 Pass-Major Risk 9/24/2015 4:16:26PM Page 2 of 3 COMPASS 5000.1 Build 61 �� �� �1�� Project: Prudhoe Bay ��� Site: PB R Pad Well: R-16 Wellbore: Plan R'16A Design: Plan #10 R-16A From 700Omd (1001ndabove planned KOP) m115OOmd (7~) From Colour To MD Scan interal 25 ft Scale 1 inch :5Oft 0 6700 Several wells fail the major risk 6700 12280 VVn| �s�=. 800*C�dhY��ryrep0��0r�"" |u 12280 12320 12320 12350 12350 14000 _ 0 14000 14500 150 14500 15000 15500 emoo 1n4miloyit, __. , -- .,, ...•_ ...._.......... . 150 180 • Project: Prudhoe Bay • Site: PB R Pad Well: R-16 Wellbore: Plan R-16A Design: Plan #10 R-16A From 11400'md (7")to TD From Colour To MD Scan interal 25 ft Scale 1 inch :50ft SeveralVIwells,fail the major risk 0 6700 See eils�mmarr iSeba foil etails 6700 12280 12280 12320 12320 12350 12350 14000 _ p 14000 14500 �� ' 14500 15000 15000 15500 . � j�'1'.. 33��� r®' % Pl ._ 15500 15952 270 f (I(Iwitia; ..; ; ) , m1/4\ kkity ��` ��----- 90 . . . . i i fi...... \ -- --- .,. / : • • fo\vo) T4 . , //,, 4‘4%. " Ofiiif( f . ::---1-441,40*941 ,, „ ,, %,„ %:,...:,„:,,- ,...:',....\..,..,,:,... -2--....-.\•,::,,.„•-,..... ---- .::::::. _iiii-i-_ ---.- k 4N, i, .A.,_ \", `" ir ,i) 1 240 75 120 .,: _ 100 .. - - 125- .• 210 .........--- 150 1 1 180 Parker 273 BOPE Sematic • PARKER 273 BOP STACK RAM TYPE BGP: ]UTCH LOCK DOWN FLANGE SHAFFER LIT DOUBLE BOP 13 5/8'-SM I A 13 5/8"-5M STUDDED TOP 13 5/8"-5M FLANGED BOTTOM o ANNULAR BCR W/(2) 14" UL2 OPERATOR, UPPER CAVITY AND (2) 14"PSLK W/BSTR OPERATOR, rinniff, . 13-5/SHAFFER LIT 13 5/8"-5M LOWER CAVITY 13-5/8" 511 STUDDED TOP 0 13-5/8' SM FLANG D BOTTOM 0 1 I ORLLINC CROSS: 1 I 13 5/8"-5M FLANGE)TOP ii: I � I 1 13 5/8"-5M FLANGED BOTTOM E T4•-• r Mo - 9 ft(2) 3 1/8"-5M 9DE OUTLETS IE 9 �1_ -I Thi .. r n KA1 LINE ��� ✓ ��, 2-1/16" 5M FLEX HOSE �t�l y�(Y1 f a■� �dai� 1' trkr'.•11 CY 1C-]C.� L 4.4.*.w. ,� 2-1 10 5M X 3-1 8' 5M D.S.A. I la ,"•'� � 3-1/8" 5M FLANGED MANUAL GALE VALVE • 3-1/8' SM FLANGED HYDRAULIC GATE VALVE E ■IIMINE=I_ ■ L._!J CHOKE LINE: RAM TYPE BOP. 3-1/8" 5M FLANGED MANUAL GATE VALVE SHAFFER LXT SINGLE 13 5/8" 5M 3-1/8" 5M FLANGED HYDRAUIJC GATE VALVE 13 5/8"-5M STUDDED TOP 13 5/8"- 5M FLANGE) BOTTOM 3-1/8" 5M FLEX HOSE w/(2) 14" UL2 OPERATOR R-16A PTD Page 6 10/5/2015 • • North America - ALASKA - BP Prudhoe Bay PB R Pad R-16 Plan R-16A Plan #10 R-16A AOGCC pre-job report 200' radius scan Anticollision Summary Report 23 September, 2015 BP Anticollision Report Company: North America-ALASKA-BP Local Co-ordinate Reference: Well R-16 Project: Prudhoe Bay TVD Reference: R-16A @ 67.05usft(rigx) Reference Site: PB R Pad MD Reference: R-16A @ 67.05usft(rigx) Site Error: 0.00usft North Reference: True Reference Well: R-16 Survey Calculation Method: Minimum Curvature Well Error: 0.00usft Output errors are at 1.00 sigma Reference Wellbore Plan R-16A Database: EDM R5K-Alaska PROD-ANCP1 Reference Design: Plan#10 R-16A Offset TVD Reference: Offset Datum Reference Plan#10 R-16A Filter type: NO GLOBAL FILTER:Using user defined selection 8 filtering criteria Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 6,900.00 to 16,172.00usft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 200.00usft Error Surface: Elliptical Conic Survey Tool Program Date 9/22/2015 From To (usft) (usft) Survey(Wellbore) Tool Name Description 116.40 7,091.40 R-16 Srvy 2 GYD-CT-CMS(R-16) GYD-CT-CMS Gyrodata cont.casing m/s 7,091.40 7,100.00 Plan#10 R-16A(Plan R-16A) GYD-CT-CMS Gyrodata cont.casing m/s 7,100.00 7,500.00 Plan#10 R-16A(Plan R-16A) INC+TREND Inclinometer+known azi trend 7,100.00 7,500.00 Plan#10 R-16A(Plan R-16A) GYD-GC-MS Gyrodata gyrocompassing m/s 7,500.00 9,000.00 Plan#10 R-16A(Plan R-16A) MWD MWD-Standard 7,500.00 11,430.00 Plan#10 R-16A(Plan R-16A) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 11,430.00 12,160.00 Plan#10 R-16A(Plan R-16A) MWD MWD-Standard 11,430.00 12,160.00 Plan#10 R-16A(Plan R-16A) MWD+IFR+MS-WOCA MWD+IFR+Multi Station W/O Crustal 12,160.00 13,660.00 Plan#10 R-16A(Plan R-16A) MWD MWD-Standard 12,160.00 16,171.38 Plan#10 R-16A(Plan R-16A) MWD+IFR+MS-WOCA MWD+IFR+Multi Station WIG Crustal Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well-Wellbore-Design (usft) (usft) (usft) (usft) PB F Pad F-37-F-37AL1-Plan#9b F-37AL 14,674.70 19,150.00 75.59 282.29 -32.15 FAIL-Major Risk PB R Pad Plan R-44-Plan R-44-Plan#6b R-44 Out of range R-16-R-16-R-16 7,387.07 7,375.00 33.09 218.00 -140.26 FAIL-Major Risk R-17-R-17-R-17 Out of range R-17-R-17A-R-17A Out of range R-18-R-18-R-18 Out of range R-18-R-18A-R-18A Out of range R-18-R-18B-R-18B Out of range R-23-R-23A-R-23A 12,284.32 15,150.00 194.68 252.59 4.69 Pass-Major Risk R-42-R-42-R-42 Out of range 9/23/2015 9:37:18AM Page 2 of 3 COMPASS 5000.1 Build 61 • • Project: Prudhoe Bay Site: PB R Pad Well: R-16 Wellbore: Plan R-16A Design: Plan#10 R-16A 6400- 6000— ,__ 400-6000— en 5600— _ ._.._.. _... LL... a _m N ¢ 5200— a c m _ `-'1:7 4800— -_____ .._..........i _._._...... ._ -_ _______ ',.— ___.- _ 41/2tlis c 4400—+fi. S / '8e in .? 0 4000 _.... • C 3600— B6� ....:is 35- zO N 9 z moo' i3200 p18L •wau.m-tmroo-ivi.�o ',p u'... 9 2800— s ,5:e''->4 s 03r o 2400— .moo ° d> J . _ 69 •E Sq < �' 2000—. .'p.•s, •`P__. �3 1... ..__ a..._._..... __..___ .._.__..._._ ......_...._. •;;..?: y� .. '. 6, .. 8�• *La 338 i d SO m o a i9 19 C 1600—. es __ 9qg___.._. .:_ _.. ......_... t ............ 5.6,_._-.+ a ...... ..___. _._ m `r p 11S a rt o id 1200—.. _y3_ ...... ___ _...___....._. 9 q2 5 1 IQo 1 I 1 1 I 1 y" 1 1 1 1 1 1 1 1 1 1 1 2000 2400 2800 3200 3600 4000 4400 4800 5200 5600 6000 6400 6800 7200 7600 8000 8400 8800 9200 9600 West(-)/East(+)(800 usft/in) • • OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. • • TRANSMITTAL LETTER CHECKLIST WELL NAME: £ // PTD: 2-5— /.g/ Development Service Exploratory Stratigraphic Test Non-Conventional vFIELD: utko-c.-- POOL: �- t Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- - - - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - ) from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10'sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a)authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application,the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 0 • El El 1 , mi a a O ii ; ; ; ; ami or ci) 2 0 p r, °a ca ; ; a w , E O LL. 0 o d y o I C, d • N U, O• � a3 O co 0o a). o � ° �, 3. -o m. E. a) a1' a) w, C LO' y 0 0 ° E. d N, 'u,. y c -6 • �',CV ; ; ; V §; o Q; 4 M'. a) a) a�. E. m, 0 • ; o� QQ..' C aa) ; ; ; ; ; C � ami, � . , C'?, � V), � N � VA O=• N -1� J, a) `-: a). > ca Li., N. m C. W, O, c. V. E, O ,r a) d CO ywI m, •S 0, mm ) . ain a. '. .0 H, I ; . . c, ° m, o, `� •a�, o 2 }' CD C' y (/), Z' a) C O d a) d J. 0' �, a) a o, U. U. , 3, C. r, V, O. Q.' E v C :CD V D a) 0 t �. M. a U. C, 't ,C. V• L, 0' x' U) (0. a. C� •- > Z CO Q.• O O .:c-r'. . U' CO U) d• 4' d' Q' 2, 2• _. Q:' E. co w , w w , . , 0 I Q to N., Ca. Ca W,, m. C. Ca. V, Ca. Ca. Ca QQQQQQQQCa. Nmm, Ca QCa)o o. 8 W. 8•. Qo' 8 QQQ;a z >, >, r, >-, >-, >-. >-. >-. >-. >-. >-. >-, z, z, z, z, 'z, z, z, z, >-, r, >- >- >- z, >- >, >, >, >-. >-, z, z, >-, z, z, z, T u) °. co o T IR U :