Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout215-187MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: P.I. Supervisor SUBJECT: FROM: Petroleum Inspector Section:24 Township:10N Range:15E Meridian:Umiat Drilling Rig:Rig Elevation:Total Depth:12600 ft MD Lease No.:ADL 0028332 Operator Rep:Suspend:X Conductor:20"O.D. Shoe@ 112 Feet Csg Cut@ Feet Surface:13 3/8"O.D. Shoe@ 2505 Feet Csg Cut@ Feet Intermediate:9 5/8"O.D. Shoe@ 10789 Feet Csg Cut@ Feet Production:O.D. Shoe@ Feet Csg Cut@ Feet Liner:7"O.D. Shoe@ 10825 Feet Csg Cut@ Feet Tubing:4 1/2"O.D. Tail@ 10648 Feet Tbg Cut@ Feet Type Plug Founded on Depth (Btm)Depth (Top)MW Above Verified Fullbore Bottom 12600 ft 10510 ft 8.34 ppg Wireline tag Initial 15 min 30 min 45 min Result Tubing 2502 2452 2435 IA 0 0 0 OA 0 0 0 Initial 15 min 30 min 45 min Result Tubing IA OA Remarks: Attachments: Cement was tagged with a 2 inch bailer on slick line. Returns looked and smelled like contaminated cement. September 19, 2025 Bob Noble Well Bore Plug & Abandonment PBU 16-15A Hillcorp North Slope, LLC PTD 2151870; Sundry 325-348 none Test Data: P Casing Removal: Brenton Nicholson Casing/Tubing Data (depths are MD): Plugging Data (depths are MD): rev. 3-24-2022 2025-0919_Plug_Verification_PBU_16-15A_bn                      MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: P.I. Supervisor SUBJECT: FROM: Petroleum Inspector Section: 24 Township: 10N Range: 15E Meridian: Umiat Drilling Rig: N/A Rig Elevation: N/A Total Depth: 12600 ft MD Lease No.: ADL 0028332 Operator Rep: Suspend: X P&A: Conductor: 20" O.D. Shoe@ 112 Feet Csg Cut@ Feet Surface: 13 3/8" O.D. Shoe@ 2505 Feet Csg Cut@ Feet Intermediate: 9 5/8" O.D. Shoe@ 10789 Feet Csg Cut@ Feet Production: O.D. Shoe@ Feet Csg Cut@ Feet Liner: 7" O.D. Shoe@ 10825 Feet Csg Cut@ Feet Tubing: 4 1/2" O.D. Tail@ 10648 Feet Tbg Cut@ Feet Type Plug Founded on Depth (Btm) Depth (Top) MW Above Verified Tubing Retainer 10471 ft 7782 ft 8.3 ppg Wireline tag Initial 15 min 30 min 45 min Result Tubing 2970 2878 2837 IA 196 199 199 OA 0 0 0 Initial 15 min 30 min 45 min Result Tubing IA OA Remarks: Attachments: Plug perforations and abandon reservoir; well left as suspended for potential rig redrill candidate. A wireline tag with a 2-inch bailer was performed. The bailer returned what looked like contaminated sandy cement (smell and color). 4?23/2025 Bob Noble Well Bore Plug & Abandonment PBU 16-15A Hilcorp North Slope LLC PTD 2151870; Sundry 325-042 none Test Data: P Casing Removal: Ryan Holt Casing/Tubing Data (depths are MD): Plugging Data (depths are MD): rev. 3-24-2022 2025-0423_Plug_Verification_PBU_16-15A_bn 9 9 9 9 9 9 99 9 9 9 9 9 9 99 9 9 999 999 99 9 James B. Regg Digitally signed by James B. Regg Date: 2025.05.09 13:57:48 -08'00' 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in thes pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU 16-15A Reservoir Abandonment Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 215-187 50-029-21474-01-00 341J ADL 0028332 12600 Conductor Surface Intermediate Production Liner 8809 80 2473 10759 4819 7782 20" 13-3/8" 9-5/8" 7" 6609 32 - 112 32 - 2505 30 - 10789 6006 - 10825 2661 32 - 112 32 - 2505 30 - 8776 5409 - 8804 None 470 1950 4760 5410 7782, 10480 1490 3450 6870 7240 10825 - 12600 4-1/2" 12.6# 13Cr80 28 - 106488804 - 8809 Structural 4-1/2" TIW HBBP-T Packer No SSSV Installed 10590, 8625 Date: Bo York Operations Manager Oliver Sternicki oliver.sternicki@hilcorp.com (907) 564 4891 PRUDHOE BAY 7/1/2025 Current Pools: Prudhoe Oil Proposed Pools: Prudhoe Oil Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 2:50 pm, Jun 09, 2025 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2025.06.06 15:33:46 - 08'00' Bo York (1248) 325-348 DSR-6/18/25 10-407 *Variance as per 20 AAC 25.112(i): Approved for alternate abandonment plug placement. *AOGCC witnessed tag TOC and MITT. JJL 6/10/25 A.Dewhurst 20JUN25 *&: Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2025.06.24 06:06:51 -08'00'06/24/25 9/19/2030 Mill Cement, Res AB Sundry Well: 16-15A PTD: 215-187 API: 50-029-21474-01 Well Name:16-15A Permit to Drill Number:215-187 Well Type SU API Number:50-029-21474-01-00 Job Scope:Mill Cement/ Res Abandon Reg.Approval Req’d?Yes Current Status:Not Operable, Offline Date Reg. Approval Rec’vd: Estimated Start Date:7/1/2025 Estimated Duration:7days Regulatory Contact:Carrie Janowski First Call Engineer:Oliver Sternicki Second Call Engineer:David Bjork Current Bottom Hole Pressure:3541 psi @ 8800’ TVD Max. Anticipated Surface Pressure:2661 psi Gas Column Gradient (0.1 psi/ft) Last SI WHP:225 psi Min ID:3.812” TRSV @ 2207’ MD Max Angle:108 deg @ 12310’ MD Top of Ivishak:10764’ MD Well History: 16-15 was originally drilled and completed in late 1985 with RWOs in 1991 and 1998. On 2/29/2016, CTD operations were shut-down due to hole stability issues in the drilling of the 16-15A sidetrack. After drilling to ~12600’ MD the rig made a long wiper trip to the window, but upon running back in hole CTD was unable to get past a collapsed shale interval at 11040’ MD. Approval to suspend the well was granted on 2/23/2017. A tubing tail plug was set at 10624’ MD and the well passed a CMIT-TxIA to 2463 psi on 3/13/2017. In the original request for suspension on 1/13/2017, the operator at the time committed to re-sidetracking or reservoir abandoning the well within 5 -years of suspension approval. No progress has been made on either option. The Ivishak confining interval is bound between the THRZ at 10516’ MD and the BHRZ at 10764’ MD. Volumetric TOC outside of the 9.625” production casing with a 30% washout is calculated at 9376’ MD. Cementing of the 7” liner in the original 16-15 bore went to plan with the plug bumped, full returns and cement stringers seen from 10165’ MD to 10574’ MD indicating 7”x 9.625” annulus is fully cemented from the shoe at 10789’ MD to the 7” liner tieback at 10574’ MD. A fullbore reservoir abandonment through a cement retainer set at 10480’ MD was attempted on 4/7/2025. Injectivity through the retainer was lost as soon as cement hit the retainer, leaving TOC in the tubing at 7782’ MD. Current Status: 16-15A is currently not operable and offline. TOC in the tubing is at 7782’ MD. Objectives: The intent of this program is to remove the cement left in the tubing due to a failed fullbore reservoir abandonment attempt in early 2025. After this is completed, we plan to reservoir abandon the 16-15A open hole sidetrack by setting a cement retainer in the tubing tail at ~10490’ MD and pumping cement through the retainer with coiled tubing, creating a lateral barrier across all tubulars and annuli within the confining zone from 10656’-10764’ MD. This scope of work is required by the AOGCC for continued suspension status of the well as a future rig sidetrack candidate. Variance Request: A variance is requested to the plugging requirements under 20 AAC 25.112(a)(1). Due to the inability of CTD to access the open hole below 11040’ MD, it is unknown if cement will be placed along the entirety of the open hole bore. By cementing the 7” liner below the WLEG, a lateral plug will be placed across all tubulars and annuli within the confining zone from 10656’-10764’ MD, this will provide isolation of the reservoir and prevent vertical movement of fluid within the wellbore. Mill Cement, Res AB Sundry Well: 16-15A PTD: 215-187 API: 50-029-21474-01 Procedure: AOGCC Witness: All AOGCC witnessed operations require a minimum of 24-hour notice to AOGCC inspectors of the timing of the operation so they can be available. Coiled Tubing: 1. MIRU CTU. 2. Mill cement down to NS CCR at 10480’ MD. POOH. Suggest using recirc skid to minimize fluid trucking. 3. Mill through CCR at 10480’ MD. Push remnants below 4.5” tubing tail at 10656’ MD. 4. RIH with one-trip cement retainer and set at ~10520’ MD. 5. Displace CT with 1% KCL. Verify flow through retainer ~40 bbls. Max circ pressure= 3000 psi. a. Continue slowly circulating fluids to keep well cool until cement is ready to be pumped. 6. Pump FW spacer and then pump 41-bbls of cement through retainer. Unsting from retainer, let ~1 bbl cement exit on top of retainer. Max circ pressure= 3000 psi. Cement Volumes: x 4.5” tubing from 10520’-10656’ MD: 136’ x 0.0152 bpf= 2 bbls x 7” liner from 10656-10825’ MD: 169’ x 0.0371 bpf= 7 bbls x 4.25” open hole from 10825’-12600’ MD: 1775’ x 0.0175 bpf= 31 bbls x 4.5” tubing on top of retainer. 1 bbl= 66’ MD Total cement: 41 bbls Cement Type/weight:Class G 14-16 ppg Bottom hole static temp:210°F Fluid Loss:60-80 cc/30 min Thickening Time:Minimum 6 hours 7. Once tail end of cement is out of nozzle, SD pump, PUH ~200’ and begin pumping pipe displacement while POOH 8. Freeze protect well to 2,500’ MD with diesel. 9. Breakdown cementing BHA and RDMO CTU. Slickline 1. WOC 5 days, Drift and tag TOC –AOGCC Witnessed. Target TOC= ~10454’ MD Fullbore 1. WOC 5 days, MIT-T to 2500 psi max applied pressure, 2250 psi target pressure –AOGCC Witnessed Mill Cement, Res AB Sundry Well: 16-15A PTD: 215-187 API: 50-029-21474-01 Current Schematic Mill Cement, Res AB Sundry Well: 16-15A PTD: 215-187 API: 50-029-21474-01 Proposed Schematic Mill Cement, Res AB Sundry Well: 16-15A PTD: 215-187 API: 50-029-21474-01 4.5” Tubing Summary . Hilcorp North Slope, LLCHilcorp North Slope, LLCChanges to Approved Work Over Sundry ProcedureDate: June 6, 2025Subject: Changes to Approved Sundry Procedure for Well 16-15ASundry #:Any modifications to an approved sundry will be documented and approved below. Changes to an approved sundry will be communicated to theAOGCC by the workover (WO) “first call” engineer. AOGCC written approval of the change is required before implementing the change.StepPageDate Procedure ChangeHNSPreparedBy (Initials)HNSApprovedBy (Initials)AOGCC WrittenApproval Received(Person and Date)Approval:Asset Team Operations Manager DatePrepared:First Call Operations Engineer Date CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Lau, Jack J (OGC) To:AOGCC Records (CED sponsored) Subject:FW: 16-15A (PTD#215-187) Sundry 325-042 work status update Date:Tuesday, April 8, 2025 11:15:49 AM Attachments:image001.png image002.png image003.png EXTERNAL RE 16-15A (PTD# 215-187) Sundry 325-042 Res AB sundry revision request .msg Thank you for the detailed update Oliver. Could you provide more insights on why the well locked up? I believe there was another recent early lockup during a fullbore cement P&A using a NS balldrop cement retainer. Given a sufficient tag of TOC and pressure test this will satisfy as a reservoir plug and you can move forward with suspension. Jack From: Oliver Sternicki <Oliver.Sternicki@hilcorp.com> Sent: Tuesday, April 8, 2025 10:51 AM To: Lau, Jack J (OGC) <jack.lau@alaska.gov> Cc: Torin Roschinger <Torin.Roschinger@hilcorp.com> Subject: 16-15A (PTD#215-187) Sundry 325-042 work status update Jack, Per our discussion yesterday the cementing didn’t go exactly to plan for the reservoir plug on 16-15A. This schematic shows the planned TOC in the tubing which was supposed to be right at the ball drop retainer at 10480’ MD. The well locked up 36 bbls short of our displacement target, leaving TOC at ~8100’ in the tubing. My calc puts TOC at 8114’ MD, field is calling it at 8092’ MD in the report, we will get the actual depth with the SL tag. This puts the bottom of cement at ~10707’ MD by my calcs. This results in a lateral plug across all strings from 10516-10707’ MD= 191’ MD. SL is currently out on the well pulling the upper GLV to get some additional freeze protect in the tubing This schematic shows the current cement in place. Assuming that we get a good TOC tag and a passing pressure test, are we good with the scope of work completed to call this a sufficient reservoir plug and move forward with the suspension renewal request? Regards, Oliver Sternicki Hilcorp Alaska, Hilcorp North Slope LLC Well Integrity Supervisor Office: (907) 564 4891 Cell: (907) 350 0759 Oliver.Sternicki@hilcorp.com The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received thismessage in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender'sphone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affectits systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Lau, Jack J (OGC) To:Oliver Sternicki Cc:Bo York Subject:RE: 16-15A (PTD# 215-187) Sundry 325-042 Res AB sundry revision request Date:Tuesday, March 25, 2025 1:55:27 PM Attachments:16-15A (PTD# 215187) Res AB Retainer Sundry Request Rev1 250325.pdf Oliver, Your proposed revision to sundry 325-042 is approved. Jack From: Oliver Sternicki <Oliver.Sternicki@hilcorp.com> Sent: Tuesday, March 25, 2025 10:15 AM To: Lau, Jack J (OGC) <jack.lau@alaska.gov> Cc: Bo York <byork@hilcorp.com> Subject: 16-15A (PTD# 215-187) Sundry 325-042 Res AB sundry revision request Jack, I have a slight change request to the cement retainer set depth and the phenolic ball drop sequence in the program for 16-15A res AB under sundry 325-042. In the original program the phenolic ball was dropped, then chased with 2 bbls of cement and then followed by the foam ball, leaving the TOC in the tubing at 10480’ MD. Instead we would like to move the retainer up to 10480’ MD, pump the 41 bbls of cement and then follow that with the phenolic and foam ball together. This will leave TOC at the same spot in the tubing (10480’ MD), but is operationally simplified, not having to do 2 ball drops and aligns with how these jobs have been recently executed. I highlighted the requested changes in yellow in the new program. Let me know if you approve. Thanks, Oliver Sternicki Hilcorp Alaska, Hilcorp North Slope LLC Well Integrity Supervisor Office: (907) 564 4891 Cell: (907) 350 0759 Oliver.Sternicki@hilcorp.com The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. Res AB Sundry REV1 Well: 16-15A PTD: 215187 API: 50-029-21474-01 Well Name: 16-15A Permit to Drill Number: 215187 Well Type SU API Number: 50-029-21474-01-00 Job Scope: Res Abandon Reg.Approval Req’d? Yes Current Status: Not Operable, Offline Date Reg. Approval Rec’vd: Estimated Start Date: 3/1/2025 Estimated Duration: 7 days Regulatory Contact: Carrie Janowski First Call Engineer: Oliver Sternicki Second Call Engineer: David Wages Current Bottom Hole Pressure: 3541 psi @ 8800’ TVD Max. Anticipated Surface Pressure: 2661 psi Gas Column Gradient (0.1 psi/ft) Last SI WHP: 225 psi Min ID: 3.812” TRSV @ 2207’ MD Max Angle: 108 deg @ 12310’ MD Top of Ivishak: 10764’ MD Well History: 16-15 was originally drilled and completed in late 1985 with RWOs in 1991 and 1998. On 2/29/2016, CTD operations were shut-down due to hole stability issues in the drilling of the 16-15A sidetrack. After drilling to ~12600’ MD the rig made a long wiper trip to the window, but upon running back in hole CTD was unable to get past a collapsed shale interval at 11040’ MD. Approval to suspend the well was granted on 2/23/2017. A tubing tail plug was set at 10624’ MD and the well passed a CMIT-TxIA to 2463 psi on 3/13/2017. In the original request for suspension on 1/13/2017, the operator at the time committed to re-sidetracking or reservoir abandoning the well within 5 -years of suspension approval. No progress has been made on either option. The Ivishak confining interval is bound between the THRZ at 10516’ MD and the BHRZ at 10764’ MD. Volumetric TOC outside of the 9.625” production casing with a 30% washout is calculated at 9376’ MD. Cementing of the 7” liner in the original 16-15 bore went to plan with the plug bumped, full returns and cement stringers seen from 10165’ MD to 10574’ MD indicating 7”x 9.625” annulus is fully cemented from the shoe at 10789’ MD to the 7” liner tieback at 10574’ MD. Current Status: 16-15A is currently not operable and offline. A PX plug is set in the tubing tail at 10624’ MD. Objectives: The intent of this program is to reservoir abandon the 16-15A open hole sidetrack by setting a cement retainer in the tubing tail at ~10610’ MD and pumping a fullbore cement job through the retainer, leaving ~130’ MD of cement on top of the retainer, creating a lateral barrier across all tubulars and annuli within the confining zone from 10656’-10764’ MD. This scope of work is required by the AOGCC for continued suspension status of the well as a future rig sidetrack candidate. Variance Request: A variance is requested to the plugging requirements under 20 AAC 25.112(a)(1). Due to the inability of CTD to access the open hole below 11040’ MD, it is unknown if cement will be placed along the entirety of the open hole bore. By cementing the 7” liner below the WLEG, a lateral plug will be placed across all tubulars and annuli within the confining zone from 10656’-10764’ MD, this will provide isolation of the reservoir and prevent vertical movement of fluid within the wellbore. Res AB Sundry REV1 Well: 16-15A PTD: 215187 API: 50-029-21474-01 Procedure: AOGCC Witness: All AOGCC witnessed operations require a minimum of 24-hour notice to AOGCC inspectors of the timing of the operation so they can be available. Slickline/ Fullbore/ Eline: 1. SL drift and pull PX plug from 10624’ MD. Completed 3/24/25 2. FB pump 268 bbls 1% KCl and 38 bbls diesel freeze protect to ensure injectivity. 5 bpm or 3000 psi max, whatever comes first. 306 bbls= 1.5x wellbore volume 3. EL set 4-1/2” drop ball NS composite cement retainer at 10480’ MD mid-element. Tie into 4.5” tubing summary dated 3/4/1998. Note: Retainer modified by Northern Solutions; contact Carl Diller @ (907) 258-6679. 4. FB test injectivity through retainer with 30 bbls diesel. Fullbore Cementing: 1. Pump meth spear and FW spacer. Pump 41 bbls cement followed by phenolic ball and foam ball, displace cement with 5 bbls FW spacer, 98 bbls 1% KCl and 56 bbls diesel freeze protect. Max pressure= 3000 psi Cement Volumes: x 4.5” tubing from 10480’-10656’ MD: 176’ x 0.0152 bpf= 3 bbls x 7” liner from 10656-10825’ MD: 169’ x 0.0371 bpf= 7 bbls x 4.25” open hole from 10825’-12600’ MD: 1775’ x 0.0175 bpf= 31 bbls Total cement: 41 bbls Cement Type/weight: Class G 14-16 ppg Bottom hole static temp: 210°F Fluid Loss: 60-80 cc/30 min Thickening Time: Minimum 6 hours Slickline 1. WOC 5 days, Drift and tag TOC – AOGCC Witnessed Fullbore 1. WOC 5 days, MIT-T to 2500 psi max applied pressure, 2250 psi target pressure – AOGCC Witnessed Res AB Sundry REV1 Well: 16-15A PTD: 215187 API: 50-029-21474-01 Current Schematic Res AB Sundry REV1 Well: 16-15A PTD: 215187 API: 50-029-21474-01 Proposed Schematic Res AB Sundry REV1 Well: 16-15A PTD: 215187 API: 50-029-21474-01 4.5” Tubing Summary . 7. If perforating: 1. Type of Request: 2. Operator Name: 3. Address: 4. Current Well Class:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Property Designation (Lease Number):10. Field: Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown What Regulation or Conservation Order governs well spacing in this pool? Will perfs require a spacing exception due to property boundaries?Yes No 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): PRESENT WELL CONDITION SUMMARY Perforation Depth MD (ft): Perforation Depth TVD (ft):Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 12. Attachments: 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: 15. Well Status after proposed work: 16. Verbal Approval: 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approcal. Proposal Summary Wellbore schematic BOP SketchDetailed Operations Program OIL GAS WINJ WAG GINJ WDSPL GSTOR Op Shutdown Suspended SPLUG Abandoned ServiceDevelopmentStratigraphicExploratory Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: AOGCC USE ONLY Commission Representative: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Location ClearanceMechanical Integrity TestBOP TestPlug Integrity Other Conditions of Approval: Post Initial Injection MIT Req'd?Yes No Subsequent Form Required: Approved By:Date: APPROVED BY THE AOGCCCOMMISSIONER PBU 16-15A Reservoir Abandon Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 215-187 50-029-21474-01-00 ADL 0028332 12600 Conductor Surface Intermediate Production Liner 8809 80 2473 10759 4819 10624 20" 13-3/8" 9-5/8" 7" 8651 32 - 112 32 - 2505 30 - 10789 6006 - 10825 2661 32 - 112 32 - 2505 30 - 8776 5409 - 8804 none 470 1950 4760 5410 10624 1490 3450 6870 7240 10825 - 12,600 4-1/2" 12.6# 13Cr80 28 - 106488804 - 8809 Structural 4-1/2" TIW HBBP No SSSV 10590 / 8626 Date: Bo York Operations Manager Oliver Sternicki Oliver.Sternicki@hilcorp.com (907) 564-4891 PRUDHOE BAY 3/1/2025 Current Pools: PRUDHOE OIL Proposed Pools: PRUDHOE OIL Suspension Expiration Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 Comm. Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 06/2023 Approved application is valid for 12 months from the date of approval.Submit PDF to aogcc.permitting@alaska.gov By Grace Christianson at 2:51 pm, Jan 29, 2025 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2025.01.28 15:10:28 - 09'00' Bo York (1248) 325-042 SFD 2/18/2025JJL 2/10/25 X DSR-1/31/25 *Variance as per 20 AAC 25.112(i): Approved for alternate abandonment contingent upon lateral plug placed across all tubulars and annuli within the confining zone from 10656’-10764’ MD *AOGCC Witnessed MIT-T to 2500 psi and Tag TOC. *Fullbore cement retainer to have ball seat to ensure cement is not over displaced past retainer. 10-404 X *&: 2/18/2025 Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2025.02.18 15:34:20 -09'00' RBDMS JSB 022525 Res AB Sundry Well: 16-15A PTD: 215187 API: 50-029-21474-01 Well Name:16-15A Permit to Drill Number:215187 Well Type SU API Number:50-029-21474-01-00 Job Scope:Res Abandon Reg.Approval Req’d?Yes Current Status:Not Operable, Offline Date Reg. Approval Rec’vd: Estimated Start Date:3/1/2025 Estimated Duration:7days Regulatory Contact:Carrie Janowski First Call Engineer:Oliver Sternicki Second Call Engineer:David Wages Current Bottom Hole Pressure:3541 psi @ 8800’ TVD Max. Anticipated Surface Pressure:2661 psi Gas Column Gradient (0.1 psi/ft) Last SI WHP:225 psi Min ID:3.812” TRSV @ 2207’ MD Max Angle:108 deg @ 12310’ MD Top of Ivishak:10764’ MD Well History: 16-15 was originally drilled and completed in late 1985 with RWOs in 1991 and 1998. On 2/29/2016, CTD operations were shut-down due to hole stability issues in the drilling of the 16-15A sidetrack. After drilling to ~12600’ MD the rig made a long wiper trip to the window, but upon running back in hole CTD was unable to get past a collapsed shale interval at 11040’ MD. Approval to suspend the well was granted on 2/23/2017. A tubing tail plug was set at 10624’ MD and the well passed a CMIT-TxIA to 2463 psi on 3/13/2017. In the original request for suspension on 1/13/2017, the operator at the time committed to re-sidetracking or reservoir abandoning the well within 5 -years of suspension approval. No progress has been made on either option. The Ivishak confining interval is bound between the THRZ at 10516’ MD and the BHRZ at 10764’ MD. Volumetric TOC outside of the 9.625” production casing with a 30% washout is calculated at 9376’ MD. Cementing of the 7” liner in the original 16-15 bore went to plan with the plug bumped, full returns and cement stringers seen from 10165’ MD to 10574’ MD indicating 7”x 9.625” annulus is fully cemented from the shoe at 10789’ MD to the 7” liner tieback at 10574’ MD. Current Status: 16-15A is currently not operable and offline. A PX plug is set in the tubing tail at 10624’ MD. Objectives: The intent of this program is to reservoir abandon the 16-15A open hole sidetrack by setting a cement retainer in the tubing tail at ~10610’ MD and pumping a fullbore cement job through the retainer, leaving ~130’ MD of cement on top of the retainer, creating a lateral barrier across all tubulars and annuli within the confining zone from 10656’-10764’ MD. This scope of work is required by the AOGCC for continued suspension status of the well as a future rig sidetrack candidate. Variance Request: A variance is requested to the plugging requirements under 20 AAC 25.112(a)(1). Due to the inability of CTD to access the open hole below 11040’ MD, it is unknown if cement will be placed along the entirety of the open hole bore. By cementing the 7” liner below the WLEG, a lateral plug will be placed across all tubulars and annuli within the confining zone from 10656’-10764’ MD, this will provide isolation of the reservoir and prevent vertical movement of fluid within the wellbore. Res AB Sundry Well: 16-15A PTD: 215187 API: 50-029-21474-01 Procedure: AOGCC Witness: All AOGCC witnessed operations require a minimum of 24-hour notice to AOGCC inspectors of the timing of the operation so they can be available. Slickline/ Fullbore: 1. SL drift and pull PX plug from 10624’ MD. 2. FB pump 268 bbls 1% KCl and 38 bbls diesel freeze protect to ensure injectivity. 5 bpm or 3000 psi max, whatever comes first. 306 bbls= 1.5x wellbore volume 3. EL set 4-1/2” drop ball NS composite cement retainer at 10610’ MD mid-element. Tie into SLB Whipstock Setting Record dated 1/23/2016. Note: Retainer modified by Northern Solutions; contact Carl Diller @ (907) 258-6679. 4. FB test injectivity through retainer with 30 bbls diesel. Fullbore Cementing: 1. Pump meth spear and FW spacer. Pump 39 bbls cement followed by phenolic ball, 2 bbls cement and foam ball, displace cement with 5 bbls FW spacer, 116 bbls 1% KCl and 38 bbls diesel freeze protect. Max pressure= 3000 psi Cement Volumes: x 4.5” tubing from 10480’-10656’ MD: 176’ x 0.0152 bpf= 3 bbls x 7” liner from 10656-10825’ MD: 169’ x 0.0371 bpf= 7 bbls x 4.25” open hole from 10825’-12600’ MD: 1775’ x 0.0175 bpf= 31 bbls Total cement: 41 bbls Cement Type/weight:Class G 14-16 ppg Bottom hole static temp:210°F Fluid Loss:60-80 cc/30 min Thickening Time:Minimum 6 hours Slickline 1. WOC 5 days, Drift and tag TOC –AOGCC Witnessed Fullbore 1. WOC 5 days, MIT-T to 2500 psi max applied pressure, 2250 psi target pressure –AOGCC Witnessed Res AB Sundry Well: 16-15A PTD: 215187 API: 50-029-21474-01 Current Schematic Res AB Sundry Well: 16-15A PTD: 215187 API: 50-029-21474-01 Proposed Schematic Res AB Sundry Well: 16-15A PTD: 215187 API: 50-029-21474-01 1/23/2016 Whipstock setting record- correlation pass. 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 16-15A Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 215-187 50-029-21474-01-00 12600 Conductor Surface Intermediate Production Liner 8809 80 2473 10759 4819 10624 20" 13-3/8" 9-5/8" 7" 8651 32 - 112 32 - 2505 30 - 10789 6006 - 10825 32 - 112 32 - 2505 30 - 8776 5409 - 8804 none 470 1950 4760 5410 10624 1490 3450 6870 7240 10825 - 12600 4-1/2" 12.6# 13Cr80 28 - 10648 8804 - 8809 Structural 4-1/2" TIW HBBP , 10592 , 8626 No SSSV 10592 8626 Bo York Operations Manager Ryan Holt Ryan.Holt@hilcorp.com (907) 659-5102 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028332 28 - 8669 0 0 0 0 0 0 0 0 0 0 N/A 13b. Pools active after work:PRUDHOE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 2:06 pm, Aug 06, 2024 Digitally signed by David Bjork (3888) DN: cn=David Bjork (3888) Reason: I am approving this document. Date: 2024.08.06 12:22:02 -08'00' David Bjork (3888) DSR-8/12/24WCB 10-1-2024 RBDMS JSB 080824 Suspended Well Site Inspection Form Notify AOGCC Inspectors at least 10 days prior to inspection to allow witness Well Name: Prudhoe Bay UNIT 16-15 Field/Pool: Prudhoe Bay / Prudhoe Oil Permit # (PTD): 2151870 API Number: Lease Wellbore Traverses: Expiration Date: Operator: Hilcorp Alaska LLC Date Suspended: 3/13/2017 Surface Location: Section: 24 Twsp: 10N Range: 15E Nearest active pad or road: DS-16 Take to Location Digital camera Map showing well location /Aerial photos Brief well history Wellbore diagram showing downhole condition Latest Sundry or Completion report Past Site Visit documentation Site clearance documentation Pressure gauges, fittings, tools Sample containers for fluids on or near pad Condition of Surface Location AOGCC requires: 1) a description of the condition of the surface location, including discoloration, fluids or sheens visible on the ground or in any nearby water, 2) photographs showing the condition of the location surrounding the well General location condition: Clean Pad or location surface: Clean Location cleanup needed: None Pits condition: Good Surrounding area condition: Good Water/fluids on pad: None Discoloration, Sheens on pad, pits or watNone Samples taken: None Access road condition: Good Photographs taken (# and description): 5 Wellhouse and well Condition of Wellhead AOGCC requires: 1) a description of the condition of the wellhead, 2) well pressure readings, where practicable, 3) photographs showing the wellhead condition Wellhead/tree/valve description, condition: Good McEvoy Wellhead Cameron Tree Cellar description, condition, fluids: Clean Rat Hole: N/A Wellhouse or protective barriers: Wellhouse Well identification sign: Good Tubing Pressure (or casing if no tubing): 280 Annulus pressures: IA - 210 OA - 0 Wellhead Photos taken (# and description): Work Required: None Operator Rep (name and signature): Ryan Holt AOGCC Inspector: Brian Bixby Other Observers: Inspection Date: 7/7/2024 AOGCC Notice Date: 7/6/2024 Time of arrival: 7:15 AM Time of Departure: 12:00 AM Site access method: Drive 500292147401 5 Year Digitally signed by Ryan Holt (4157) DN: cn=Ryan Holt (4157) Date: 2024.07.07 14:23:52 - 08'00' Ryan Holt (4157) —•’‡†‡†‡ŽŽ •’‡…–‹‘‡˜‹‡™‡’‘”–Reviewed By: P.I. Suprv Comm ________ :ZϬϴͬϭϲͬϮϬϮϰ /ŶƐƉĞĐƚEŽ͗ƐƵƐϮϰϬϳϬϳϭϮϰϱϯϯ tĞůůWƌĞƐƐƵƌĞƐ;ƉƐŝͿ͗ ĂƚĞ/ŶƐƉĞĐƚĞĚ͗ϳͬϳͬϮϬϮϰ /ŶƐƉĞĐƚŽƌ͗ƌŝĂŶŝdžďLJ /ĨsĞƌŝĨŝĞĚ͕,Žǁ͍KƚŚĞƌ;ƐƉĞĐŝĨLJŝŶĐŽŵŵĞŶƚƐͿ ^ƵƐƉĞŶƐŝŽŶĂƚĞ͗ϯͬϭϯͬϮϬϭϳ η ϯϭϳͲϬϰϬ dƵďŝŶŐ͗ϮϱϬ /͗ϮϭϬ K͗Ϭ KƉĞƌĂƚŽƌ͗,ŝůĐŽƌƉEŽƌƚŚ^ůŽƉĞ͕>> KƉĞƌĂƚŽƌZĞƉ͗ZLJĂŶ,Žůƚ ĂƚĞK'EŽƚŝĨŝĞĚ͗ϳͬϲͬϮϬϮϰ dLJƉĞŽĨ/ŶƐƉĞĐƚŝŽŶ͗^ƵďƐĞƋƵĞŶƚ tĞůůEĂŵĞ͗WZh,KzhE/dϭϲͲϭϱ WĞƌŵŝƚEƵŵďĞƌ͗ϮϭϱϭϴϳϬ tĞůůŚĞĂĚŽŶĚŝƚŝŽŶ 'ŽŽĚ ^ƵƌƌŽƵŶĚŝŶŐ^ƵƌĨĂĐĞŽŶĚŝƚŝŽŶ 'ŽŽĚ ŽŶĚŝƚŝŽŶŽĨĞůůĂƌ 'ŽŽĚ ŽŵŵĞŶƚƐ >ŽĐĂƚŝŽŶsĞƌŝĨŝĞĚtŝƚŚƐͲƵŝůƚDĂƉ͘ ^ƵƉĞƌǀŝƐŽƌŽŵŵĞŶƚƐ WŚŽƚŽƐ;ϰͿĂƚƚĂĐŚĞĚ ^ƵƐƉĞŶƐŝŽŶƉƉƌŽǀĂů͗^ƵŶĚƌLJ >ŽĐĂƚŝŽŶsĞƌŝĨŝĞĚ͍ KĨĨƐŚŽƌĞ͍ &ůƵŝĚŝŶĞůůĂƌ͍ tĞůůďŽƌĞŝĂŐƌĂŵǀĂŝů͍ WŚŽƚŽƐdĂŬĞŶ͍ sZWůƵŐ;ƐͿ/ŶƐƚĂůůĞĚ͍ Ws/ŶƐƚĂůůĞĚ͍ &ƌŝĚĂLJ͕ƵŐƵƐƚϭϲ͕ϮϬϮϰ 9 9 9 9 9 9 2024-0707_Suspend_PBU_16-15A_photos_bb Page 1 of 2 Suspended Well Inspection – PBU 16-15A PTD 2151870 AOGCC Inspection Rpt # susBDB0707124533 Photos by AOGCC Inspector B. Bixby 7/7/2024 2024-0707_Suspend_PBU_16-15A_photos_bb Page 2 of 2 o a s.. tir r o v sr. ws STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION JUL 2 3 2019 REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operation 5 Iltldlw(Tr��❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Suspended Inspection 0 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work 5. Permit to Drill Number. 215-187 3. Address: P.O. Box 196612 Anchorage, Development 0 Exploratory ❑ AK 99519-6612 Stratigraphic ❑ Service ❑ 1 6. API Number: 50-029-21474-01-00 7. Property Designation (Lease Number): ADL 0028332 e. Well Name and Number: PBU 16-15A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary. Suspended Total Depth: measured 12600 feet Plugs measured 10624 feet 15. Well Class after work: Exploratory ❑ true vertical 8809 feet Junk measured None feet Effective Depth: measured 10624 feet Packer measured 10592 feet true vertical 8651 feet Packer true vertical 8626 feet Casing: Length: Size: MD: TVD: Burst: Structural Conductor 80 20" 32-112 32-112 1490 Surface 2473 13-318" 32-2505 32-2505 3450/5380 Intermediate 10759 9-5/8" 30-10789 30-8776 6670 Production Liner 4819 7" 6006- 10825 5409-8804 7240/8160 Perforation Depth: Measured depth: None feet True vertical depth: feet Tubing (size, grade, measured and true vertical depth) 4-1/2" 12.6# 13Cr80 28-10648 Packers and SSSV (type, measured and 4-1/2" TIW HBBP Packer true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 10592 28-8669 8626 Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Collapse: 470 1950 / 2670 4760 5410/7020 Tubing Pressure Prior to well operation Suspended Subsequent to operation: 14. Attachments: (required per 20 MC 25 07025.071, a 25.283) Daily Report of Well Operations 0 Copies of Logs and Surveys Run ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 15. Well Class after work: Exploratory ❑ Development 0 Service ❑ Stretigraphic ❑ 16. Well Status after work: Oil ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ Gas ❑ WDSPL ❑ SUSP 0 SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Lastufka, Joseph N Sundry Number or N/A if C.O. Exempt: N/A Contact Name: Montgomery, Travis J Authorized Title. SI pec4alist Contact Email: Authorized Signature. Date: //��I Contact Phone: Travis.Montgomervabp.corn +1 907 564 4127 �r ��� p��', Form 10-404 Revised 04/2017 �7ry /' rw•�ap Rr.�r� RBDMS -14 UL 2 4 2019 Submit Original Only Dai I n/U = SSV/ZUU/U. I emp = SI. SU well inspection (AOGCC witnessed by Bob Noble), AL. No flowline. 19 SV, WV, SSV = C. MV = O. IA. OA = OTG. 10:55 Suspended Well Site Inspection Form Initial Inspection Notify AOGCC Inspectors at least 10 days prior to inspection to allow witness Well Name: 16-15A Field/Pool: Prudhoe Bay / Prudhoe Oil Permit# (PTD): 2151870 API Number: 49.0 09 $'b -aicf— 2f4?N �O Operator: BP EXPLORATION (ALASKA) INC Date Suspended: 3/13!2017 Surface Location Section: 24 Twsp: 10N Range: 15E Nearest active pad or road: DS -16 Take to Location Digital camera Brief well history Latest Sundry or Completion report Past Site Visit documentation Pressure gauges, fittings, tools Map showing well location /Aerial photos Wellbore diagram showing downhole condition Site clearance documentation Sample containers for fluids on or near pad Condition of Surface Location AOGCC requires: 1) a description of the condition of the surface location, including discoloration, fluids or sheens visible on the ground or in any nearby water, 2) photographs showing the condition of the location surrounding the well General location condition: Pits condition: I Surrounding area condition: Water/fluids on pad: tj r, Discoloration, Sheens on pad, pits or water: Alt; Samples taken: None Access road condition: Photographs taken (# and Condition of Wellhead AOGCC requires: 1) a description of the condition of the wellhead, 2) well pressure readings, where practicable.. 3) photographs showing the wellhead condition Well description, condition: Cellar description, condition, fluids: Div Rat Hole: Wellhouse or protective bs Well identification sign: Tubing Pressure (or casino Annulus pressures: Wellhead Photos taken (# Work Required: None Operator Rep (name and signature): Josh Prowant AOGCC Inspector: (`table Other servers: Inspection Date: ?��� lR AOGCC Notice Date: Time of arrival: / i nh Time of Departure: Site access method: Access Road I �•- _ � _ i �_ ,. _. "; _ � ^ ppp��Y �� '+ �� �� S,: ♦ � r i e � 'i m. V TREE= McEVOY GEN4 Wl3LFEAD= MCEVOY ACTUATOR= BAKERC OKB. HEV = AY Rff ELE = 70' BF. E EV 39.96' KOP= 3262 Mau Angle = 50" @ 6700' D6tumhD= 1093T Datum TVD= 88W SS 16-15A SAFETYNOTES:—CHROMETBG— SUSPENDED 20I ODFD Dom — 113-3/8" CSG, 72#, L -80M-55, D - 12.347' I X 7" 11- LNH-1Li1AQ(, Z6#, L-60, .0383 bpf, D=6.276' 11 10674' Minimum ID = 3.726" @ 11038' 4-112" HES XN NIPPLE 4-12' TBG, 12.6#, 13CR .0152 bpf, D = 3.958' 10645' 9-5/8• CSG, 47#, L-80 BTRS, D - 8.661' 10788' 7" BKR DELTA WS (01/23116) 10822' OUIVP BALM CMT (0122/161 1(1RAA' ,I 066r ,0668 PERFORATION SULOMRY Rff LOG: BHCS ON 12/14/85 ANGLE AT TOP PERE 38" @ 10870' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL OprVSgz SHOT SOZ 338" 4 10878 -10891 S 07/09/86 0 3-3/8' 4 10879- 10892 C 06/12/88 DMY M 338' 4 10897 -10915 C 06/12/88 KBG-2-LS 3-38• 4 10918-10933 C 06/12/88 44 3-38" 4 10918-10933 S 07rt)Q/86 7984 3-38• 4 10936 - 10949 C 06/12/88 6 10363 3-38' 4 10936 -10949 S 07/0986 03105/98 338• 4 10959 - 11006 C 06/12/88 33/8" 4 10959 - 11006 S 07/09/86 338• 6 11045 - 11065 C 08/13/09 331W 2 11060 - 11066 C 10/19/92 338" 12 11060-11080 S 06/23/86 3-318" 1 6 11075-110951 C 06/13/09 OF 4-12" TBG H 11025' F. D = 3.958" 11042' 7" LN R. 290, N-80 STIRS, .0371 14.1/2•CAMCOBAL-OSSSVNP,D=3.812• I GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 3309 3306 10 KBG2-LS DMY M 0 0820106 2 3701 3686 17 KBG-2-LS DMY M 0 0529/14 3 6872 5987 50 KBG-2-LS DMY Mr 0 0529/14 4 9026 7503 44 KBG-2-LS DMY NT 0 03105/98 5 9733 7984 48 KBG-2-LS DMY PIT 0 08/13106 6 10363 8430 41 KBG-2-LS DMY PTT 0 03105/98 1 10690' 1' 'IU"W—14-12-TLRWrw TALWLEG,D=4.000' 10666' ELMD TT NOT LOGGED MLLOUT WINDOW (10.16A) 10625'- 10834' 11660' 3.825" ALUMNUM BILLET 16-15A PBI 4.25' TD OPEN HOLE TO OPEN HOLE 1--i 12600' j 11026' 1-17- X 4.5" TWO PKK D=3.946" 11038' 4-1/7 HES XN NP, D = 3.725' 11042' 4-12"TUBNGTAL,D=3.854" 11042' ELM TT LOGGED 0225192 DATE REV BY OOFd.84TS 047E REV BY COMY84TS 12f1485 ORIGINAL COMPLETION 03(07/16 TB/JMD FINAL ODE APPROVAL 12118191 IWO 03114/17 ZV/JMD SET PX PLUG (03113117) 03/05/98 NQES LAST WORKOV ER 03/29/17 J14JJMD SET RE= 8 BF ELEV 02/28116 NOROIC2 OPS SHUTDOWN (16-15A) 03113N7 SUSPENDED(16-15A) 03/07/16 JMD ORLG HO CORRECTIONS 12710' 1 5A PRUDFDEBAY UMr WELL: 16-15A POW N1:12151870 API Nb: 50-029-21474-01 Sec. 24, T10K R15E 141 T FNL 8 505' FVYL BP Exploration (Alaska) Date Inspected: 06/13/17 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Suspended Well Inspection Report Inspector. Bob Noble Well Name: PBU 16-15A PTD No.: 2151870 Location Verified? Yes If Verified, How? Other (specify in comments) Onshore / Offshore: Onshore Operator: SPX Oper. Rep: Mike Zimmer Oper. Phone: 907-659-5766 Oper. Email: Suspension Date: 03/13/17 Date AOGCC Notified: 06/12/17 ' Sundry No.: 317-040 Type of Inspection: Initial - Wellbore Diagram Avail.? Yes Well Pressures (psi): Tubing N/A Photos Taken? Yes ' IA 260 OA 0 of Of ng Surface Fallow Up Actions Needed: Photos (3) was in good condition, No signs on leaks. All lines removed, blinded with gauges, SSV was closed. protecting wellhead. Clean ice in cellar, Good clean gravel around pad. Location was verified with pad map. Sulam BY: PLB 12/2014- 2017-0613 Suspenc PBU_16-15A_bn Suspended Well Inspection — PBU 16-15A PTD 2151870 Photos by AOGCC Inspector B. Noble 6/13/2017 WELL: 16-15A OWNER Prudhoe Bay Unit OPERATOR SP Exploration (Alaska) Inc. API NUMBER 50-029-21474-01-00 SUR. LOCATION NW 1/4, Sec. 24, T10N, R15E DRIWNG PERMIT 215-187 2017-0613_Suspend_PBU_16-15A_photos bn.docx N Suspended Well Inspection Review Report InspectNo: susRCN190707180517 Date Inspected: 7/6/2019 Inspector: Bob Noble Well Name: PRUDHOE BAY UNIT 16-15A - Permit Number: 2151870 Suspension Approval: Sundry # 317-040 Suspension Date: 3/13/2017 Location Verified? ❑] If Verified, How? Other (specify in comments) Offshore? ❑ Type of Inspection: Subsequent Date AOGCC Notified: 7/5/2019 Operator: BP Exploration (Alaska) Inc. Operator Rep: Josh Prowant Wellbore Diagram Avail? ❑� Photos Taken? Well Pressures (psi): Tubing: Fluid in Cellar? ❑ IA: 200 BPV Installed? ❑ OA: 0 VR Plug(s) Installed? ❑ Wellhead Condition Wellhouse protecting wellhead. No flow line or AL line. Both blinded. SVS is closed. Condition of Cellar Clean dry gravel. Surrounding Surface Condition clean gravel. Comments Location verified with a pad map. Supervisor Comments Photos(2)attached Monday, August 19, 2019 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Suspended Well Insp Rpt m 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development ®Exploratory ❑ 5. Permit to Orill Number: 215-187 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Strafigraphic ❑ Service ❑ 1 6. API Number: 50.029-21474-01-00 7. Property Designation (Lease Number): ADL 0028332 8. Well Name and Number. PBU 1&15A 9. Logs (Ust logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 12600 feet Plugs measured 10624 feet RECEIVE[ true vertical 8809 feet Junk measured feet Effective Depth: measured 10624 feet Packer measured 10592 feet JUL 1 3 2017 true vertical 8651 feet Packer true vertical 8628.46 feet AOGCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 79 20" 91.5# H-40 32-111 32-111 1490 470 Surface See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Intermediate 10762 9-5/8" 47# L-80 30-10792 30 - 8779 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 10825 - 12600 feet True vertical depth: 8804 - 8809 feet feet Tubing (size, grade, measured and true vertical depth) 4-112" 12.6# 13Cr80 28-10648 28-8669 Packers and SSSV (type, measured and See Attachment See Attachment See Attachment true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Suspend While Drill Subsequent to operation: Susdend While Drill 14. Attachments: (W&W per 20 AAc 25.070.25.071. a 25.2sa) 15. Well Class after work: Daily Report of Well Operations H Exploratory ❑ Development ® Service ❑ Stratlgraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil ❑ Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ® SPLUG ❑ 17. 1 herebycertify that the for Sundry Number or N/A if C.O. Exempt: fy agoing is [rue and correct to the best of my knowledge. 31&169 Authorized Name: Ohms, Danielle H Contact Name: Ohms, Danielle H Authorized Tide: Pe um ngmeering Disci ne Le d Alaska Contact Email: Danielle.OhmsQbp.cem Authorized Signature: Date: Z—/ Contact Phone: +1 907 564 5759 Form 10-004 Revised 0411017 /4117 KtSUMS I,- JUL 1 4 NY/Submit Original Only Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, AK 99501-3572 DECEIVE® RE: BP Exploration (Alaska), Inc. JUL 13 2017 Report of Sundry Well Operations Summary ACGCC July 12, 2017 To Whom it May Concern: Attached please find the Report of Sundry Well Operations for the Initial Suspended Well Inspection Report for Well 16-15A, PTD # 215-187. Sincerely, BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Attachment: Form 10-404 BP Exploration (Alaska) , Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Enter/Exit k-, 4� A Jr O o 0 1 f175' -w- 17 or (75 AT 4 14 A 04 20 0 1 • III 3.�_ 211 13 a r 17�_ 30 • �7 i (1�Q it 12 1 SI r .4 23. I 1 iI ' T-21� II 60, o I' 'moifl C} 11 1, I� b ■ aim 6 274 ra�el gig �I25 a Removed p I 26 N ham Tu m,e 157' S s 3 • II /1 I I � 295' �. 7 Gravel I I r C] Removed 1 A A 1 1 T.,d,e a 210' 1\ too ti�v v Ll N _G ■ WELL A WELL INJECTOR DATE : 6/30/2016 1 SCALE: 1" = 300' 1 MAP DATE: 2015 For current Well and Service information please see Atlas: http://alaska-gis.bpweb.bp.com PBU - DS 16 b510995.d o \ k-, 4� A Jr O o 0 1 f175' -w- 17 or (75 AT 4 14 A 04 20 0 1 • III 3.�_ 211 13 a r 17�_ 30 • �7 i (1�Q it 12 1 SI r .4 23. I 1 iI ' T-21� II 60, o I' 'moifl C} 11 1, I� b ■ aim 6 274 ra�el gig �I25 a Removed p I 26 N ham Tu m,e 157' S s 3 • II /1 I I � 295' �. 7 Gravel I I r C] Removed 1 A A 1 1 T.,d,e a 210' 1\ too ti�v v Ll N _G ■ WELL A WELL INJECTOR DATE : 6/30/2016 1 SCALE: 1" = 300' 1 MAP DATE: 2015 For current Well and Service information please see Atlas: http://alaska-gis.bpweb.bp.com PBU - DS 16 b510995.d Page 1 of I https:Honemap-alaska.bpweb.bp.comlagsserviceslrest/directorieslaregisoutput/PrintlExportWebMap_GPServerl ags_74fe26781... 7/12/2017 \ ,a w Eas a eyunlai Was�esposal Slt �' i r, fJ UNCONTROLLED J f—y✓ State 1. � 1 .. f _ f 1). _rte / ✓I I '— 1 1 11 IJ. 'J .'� �\ e https:Honemap-alaska.bpweb.bp.comlagsserviceslrest/directorieslaregisoutput/PrintlExportWebMap_GPServerl ags_74fe26781... 7/12/2017 i niv = zauizowvac. i emp = oi. rrre AUUL;u suspended well inspection. No AL and the FL is disconnected and blinded at the WV. Completed Suspended well site inspection form and turned into the WIE. 6/7/2017 SSV, WV, SV = C. MV = O. IA, OA = CTG. 11:00. Suspended Well Site Inspection Form Initial Inspection Notify AOGCC inspectors at least 1C days prior to inspection to allow witness Well Nance DS16-15A Field/Pool Prudhoe Bay / Prudhoe Oil Pe,mit a (PT D) 2151870 API Number 500292147401 Operator BP EXPLORATION LALASKA) INC Date Suspended 3/13/2016 Surface Location Section 24 Twsp ION Range 15E Nearest active pad or road DS 3 Take to Location Dig:ta; camera 6-,ef web h story Latest S,mdry or Completion report Past S to Visit ctocumentacon P-essu•e gauges_ fittings tools Map showing well location /Aerial photos Wellbore diagram showing downhole condition Site clearance documentation Ce-_,t_c__ Location AOGCC requires the ccrl(i of the surface location including discoloration Fluids or sheens visible any nearby water e ow ng the cpnd i on of the location surrounding the well - `ace 3 o aeecee area condition 'oac S-eens or :,ac pits or water SaT r None Access roac I=-I- PnorOgrap's taken. ;= aro descnpi!Ori Cond ton of Wellhead AOGCC requires ) a oesc iption of the condition of the wellhead 2) well pressure readings. where practicable. 3: photograpns showing the wellhead condition Wetlheadltreervalvedescription. condition c Cellar description condition, Fluids. Rat Hole We0ouse or protective barriers Well identification sign Tubing Pressure (or casing if no tubing) Annulus pressures W* A: 7"), OA - Wellhead Photos taken (# and description) Required None Operator Rep (name and signature) M , r 1 • M mel AOGCC Inspector % j'1 r Other Observers inspection Date i),, !� AOGCC Notice Date Time of arrival .a ,, .)Time of Departure �. DD Prn Site access method n„ i; c u Ab 4 �e An -, i 4C- -N 000, Z., 01 -Awl I f i� rm 1 wr000ki �mo ot r i� IN .we 'L A i �a u I U for oo� A flow 00 i % 9 S � ' ' t r i r� � Casing / Tubing Attachment PBU 16-15A Casing CONDUCTOR Length 79 Size MD 20" 91.5# H-40 TVD Burst Collapse SURFACE 29 32 13-3/8" 68# K-55 31 111 60 32 111 1490 470 SURFACE 2448 13-3/8" 72# L-80 60 - 2508 31 60 60 3450 1950 INTERMEDIATE 10762 9-5/8" 47# L-80 3-0-710792 30 2508 4930 2670 LINER 4574 7" 26# L-80 6009 10583 5411 8779 8619 6870 7240 4760 LINER TUBING 248 7" 29# N-80 10577 - 10825 8615 - 8804 8160 5410 7020 10620 4-1/2" 12.6# 13Cr80 28 10648 28 - 8669 8430 7500 Packers and SSV's Attachment PBU 16-15A SW Name Type MD TVD Depscription 16-15A PACKER 6008.52 5410.79 7" Baker ZXP Top Packer 16-15A TBG PACKER 10592.25 1 862646 4-119" TI1A/ I-IRRD Dn^L— TREE= Mc EVOY GEN4 SIZE WELLHEAD ACTUATOR =KGR BAKB7c 1 fi-15A SHOT StY SUSPENDED OKB ELEV OKB_ ELEV = 70' 10878 - 10891 REF ELEV = 70' 0 0820/06 3-3/8" BF ELEV = 39.96' 20'„CONO. D_ 7 80' 06!12/88 KOP= 3262' 3-3/8" 4 Malt Angle = _ 50' @ 6700' O Datum MD= 10937' Dalum TVD= 8800'SS 13-3B' CSG. 72#, L -801K -55_D = 12.347” _ 2606' 19-518* X 7" ZXP LTP w hAAc HGR D = 6.25' 7" LNR-TACK, 26#, L-80. _0383 bpf. D= 6.276' Pf 10674_' Minimum ID = 3.726" @ 11039' 4-1/2" HES XN NIPPLE TBG, 12.6#, 13CR .0152 bpf. ID = 3.956'10646' 7" BKR DELTA S (01/23116) 82"W2 OlpttP BALED CMT(01/22/16) i 10846' 7" POSISETFil1G (01!21/16) 10857' LLY SET POSISET PLUG (0121/16) 10a69' PERFORATION SU"RY RET LOG' BFCS ON 12/14/85 ANGLE AT TOP PE RF': 38-@) 10870' Note. Refer to Roducbon DB for historical pert data 1 SIZE SPF NfEINAL Opn/Sgz SHOT StY 1 3309 3-3/8" 4 10878 - 10891 S 07MWBB 0 0820/06 3-3/8" 4 10879 - 10892 C 06!12/88 NT 0 3-3/8" 4 10897 - 0"5C 50 06!12/88 NT 3318" 4 10918 - 10933 C 06!12/88 KBG-2-LS jDMY 3-38" 4 10918 - 10933 S 07!09/86 48 KBG-2-LS, 3-38" 4 10936 - 10949 C 96/12/88 8430 41 3-38" 4 10936 - 10949 S 07/09/86 3-38" 4 10959 - i 1006 C 06/12/88 3-38" 4 111959-1 1006 S 07/09/86 3-38" 6 11045 - 11065 C 08713/09 3-38" 2 11060 - 11066 C 10/19/92 3-38" ti2 11060 - 11C80 S 0623186 3-38" 6 11075 - 11095 C 08/13!09 (TOPOF4-12"TBG -11 ------------ 13CM .0152 bpi, D= 3.958" /- LNR 29#, P480 BT7'S, .0371 bpf, D = 6 184" 11388• SAFETY N0T6: '"`CHROME TBG ^" 10-112- I MGO BAL-0 SSSV NP p = 3819- 1 GAS LFT MANDRELS ST MU TVD DEV TYPE VLV LATCH PORT DATE 1 3309 3306 10 KR -B 2 -LS OIAY M 0 0820/06 2 3701 3686 17 KBG-2-LS SUSPBC®(16-15J1) NT 0 05/29/143 16872 5987 50 KBG2-LS NT 0 05/29/144 9026 7503 44 KBG-2-LS jDMY NT 0 03/05/985 9733 7' 984 48 KBG-2-LS, DW INT I 0 13106 6 0363 8430 41 I®G2-LS M 0 03/05/98 112' T1W HBBP-T PKR D = 3.912' PESXW0=3813-, 1666' jLE T -T NOT LOGGED MILLOUT V4NDOW 06-15A) 10825' - 10834' I6 -ISA PBI K*25! 425. TD,OPT HOLE 12600_ / 6-15A 11026' T X 4.5TYYD PRR D = 3_946' 11039' 4112' FES XN NP ID -= —3725---1, 11042 014CANAL COMPLETION 41!2ND= 384A ' 11042' ELM T LLOGGED 02/25/92 DATE REV BY COMMENTS DATE REV BY COKWENTS 12/14185 014CANAL COMPLETION 03!07116 TB/JMD F14AL ODE APPROVAL 12/IMI 03(05198 IRNO WES LAST WORKOVER 03114117 0329/17 ZV/JMD JNJJMD SET PX PLUG (03/13!17) SET REF 8 BF ELEt/ 02128/16 NORDIC2 OPS SFCfTDOWN(16-15A) 03/13/17 SUSPBC®(16-15J1) 03/07/16 JMD DRLG FIO CORREC.'f10NS RETAMER P RUDHOE BAY LM WELL. 16 -ISA PEiti1T W 12151870 AFI No50-029-2147401 Sec 24, T10N, R15F 1417" FN- 8 505' FWL BP Exploration (Alaska) DATA SUBMITTAL COMPLIANCE REPORT 6/19/2017 Permit to Drill 2151870 Well Name/No. PRUDHOE BAY UNIT 16 -ISA ! au Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-21474-01-00 MD 12600 TVD 8809 Completion Date Completion Status Current Status SUSP UIC No REQUIRED INFORMATION / Mud Log No V/ Samples No Y Directional Survey Yes 11/ DATA INFORMATION Types Electric or Other Logs Run: MWD/GR/Res (data taken from Logs Portion of Master Well Data Maint) Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval CHI Type Med/Frmt Number Name __. Scale Media No Start Stop P CH Received Comments ED C 26904 Digital Data 10587 12600 3/9/2016 _ Electronic Data Set, Filename: 16- 15A_LW D_ FINAL_ FIELD_COMPOSITE_27FEB2 016_BHI_CTK.Ias ED C 26904 Digital Data 3/9/2016 Electronic File: 10693702 air hang and constants.pdf ED C 26904 Digital Data 3/9/2016 Electronic File: 12914857 air hang and constants.pdf ED C 26904 Digital Data 3/9/2016 Electronic File: USR_3in_10693702_16- 15A_PostRun_04_25Feb16_0530.pdf ED C 26904 Digital Data 3/9/2016 Electronic File: USR 3in 10693702 16- 15A_PreRun_03_14Febl6_1503.pdf ' ED C 26904 Digital Data 3/9/2016 Electronic File: USR_3in_12914857_16- 15A_PostRun_07_27Feb16_0055.pdf ED C 26904 Digital Data 3/9/2016 Electronic File: USR_3in_12914857_16- 15A_PreRun_07_25Feb16_1340.pdf ED C 26904 Digital Data 3/9/2016 Electronic File: 16- 15A_ GR—Res _28FEB2016_MD_FINAL_FIELD_B. HI_CTK.cgm ED C 26904 Digital Data 3/9/2016 Electronic File: 16- 15A_GR_Res_28FEB2016_TVDSS_FINAL_FIEL D_BHI_CTK.cgm ED C 26904 Digital Data 3/9/2016 Electronic File: 16- P 15A_GR_Res 28FEB2016_MD_FINAL_FIELD_B HI_CTK.pdf ED C 26904 Digital Data 3/9/2016 Electronic File: 16- 15A_GR_ Res _28FEB2016_TVDSS_FINAL_FIEL, D_BHI_CTK.pdf A06CC Page i of Monday, June 19, 2017 DATA SUBMITTAL COMPLIANCE REPORT 6/19/2017 Permit to Drill 2151670 Well Name/No. PRUDHOE BAY UNIT 16-15A Operator BP EXPLORATION (ALASKA) INC. API No. 50-029-21474-01-00 MD 12600 TVD 8809 Completion Date Completion Status Current Status SUSP UIC No ED C 26904 Digital Data 3/9/2016 Electronic File: 16-15A Final Survey Report.pdf • ED C 26904 Digital Data 3/9/2016 Electronic File: 16-15A Final Survey Report.txt - ED C 26904 Digital Data 3/9/2016 Electronic File: 16-15A Final Surveys.csv ED C 26904 Digital Data 3/9/2016 Electronic File: 16-15A Final Surveys.xls ED C 26904 Digital Data 3/9/2016 Electronic File: 16- 15A_25_tapescan_BHI_CTK.txt ED C 26904 Digital Data 3/9/2016 Electronic File: 16-15A_5_ tapescan_BHI_CTK.txt ED C 26904 Digital Data 3/9/2016 Electronic File: 16-15A_output.tap - ED C 26904 Digital Data 3/9/2016 Electronic File: 16- 15A GR Res _28FEB2016_MID _FINAL _FIELD _B_ HI_CTK.tif ED C 26904 Digital Data 3/9/2016 Electronic File: 16- 15A_GR_Res 28FEB2016_TVDSS_FINAL •, _FIEL D_BHI_CTK.tif ED C 26904 Digital Data 3/9/2016 Electronic File: 10693702 air hang and . constants.pdf _ ED C 26904 Digital Data 3/9/2016 Electronic File: 12914857 air hang and constants.pdf ED C 26904 Digital Data 3/9/2016 Electronic File: USR_3in_10693702_16-• 15A_PostRun_04_25Feb16_0530.pdf ED C 26904 Digital Data 3/9/2016 Electronic File: USR_3in_10693702_16-, 15A_PreRun_03_14Feb16_1503.pdf ED C 26904 Digital Data 3/9/2016 Electronic File: USR_3in_12914857_16- 15A_PostRun_07_27Feb16_0055.pdf ED C 26904 Digital Data 3/9/2016 Electronic File: USR_3in_12914857_16- • 15A_PreRun_07_25Feb16_1340.pdf Log C 26904 Log Header Scans 0 0 2151870 PRUDHOE BAY UNIT 16-15A LOG HEADERS Log C 26905 Log Header Scans 0 0 2151870 PRUDHOE BAY UNIT 16-15A PS1 LOG HEADERS ED C 26905 Digital Data 10587 12710 3/9/2016 Electronic Data Set, Filename: 16- 15APB1_LWD_FINAL_FIELD_COMPOSITE_24F EB16_BHI_CTK.las ED C 26905 Digital Data 3/9/2016 Electronic File: 10693702 air hang and, constants.pdf AOGCC Pagc 2 of 4 Monday, Jane 19, 2017 DATA SUBMITTAL COMPLIANCE REPORT 6/19/2017 Permit to Drill 2151870 Well Name/No. PRUDHOE BAY UNIT 16-15A Operator Be EXPLORATION (ALASKA) INC. API No. 50-029-21474-01-00 MD 12600 TVD 8809 Completion Date Completion Status Current Status SUSP UIC No ED C 26905 Digital Data 3/9/2016 Electronic File: 12914857 air hang and constants.pdf. ED C 26905 Digital Data 3/9/2016 Electronic File: USR 3in 10693702_16- 15A_PostRun_04_25Feb16_0530.pdf ED C 26905 Digital Data 3/9/2016 Electronic File: USR 3in 10693702_16- 15A_PreRun_03_14Feb16_1503.pdf ED C 26905 Digital Data 3/9/2016 Electronic File: USR 3in 12914857_16- 15A_PostRun_07_27Feb16_0055.pdf ED C 26905 Digital Data 3/9/2016 Electronic File: USR 3in 12914857 16- ' 15A_PreRun_07_25Feb16_1340.pdf ED C 26905 Digital Data 3/9/2016 Electronic File: 16- 15APB1_GR_Res_24FEB2016_MD_FINAL_FIEL D_BHI_CTK.cgm ED C 26905 Digital Data 3/9/2016 Electronic File: 16- 15APB1_GR_Res_24FEB2016_TVDSS_FINAL_ FIELD_BHI_CTK.cgm ED C 26905 Digital Data 3/9/2016 Electronic File: 16- P 15APB7 GR_Res_24FEB2016_MD_FINAL_FIEL- D_BHI_CTK.pdf ED C 26905 Digital Data 3/9/2016 Electronic File: 16- 15APB1_GR_Res _24FEB2016_TVDSS_FINAL_ ' C FIELD_BHI_CTK.pdf ED C 26905 Digital Data 3/9/2016 Electronic File: 16-15APB1 Final Survey Report.pdf ED C 26905 Digital Data 3/9/2016 Electronic File: 16-15APB1 Final Survey Report.txt ED C 26905 Digital Data 3/9/2016 Electronic File: 16-15APB1 Final Survey.csv - ED C 26905 Digital Data 3/9/2016 Electronic File: 16-15APB1 Final Survey.xls . ED C 26905 Digital Data 3/9/2016 Electronic File: 16- 15APB1_25_tapescan_BHI_CTK.txt- ED C 26905 Digital Data 3/9/2016 Electronic File: 16- 15APB15_tapescan_BHI_CTK.txt ED C 26905 Digital Data 3/9/2016 Electronic File: 16-15APB1_output.tap ED C 26905 Digital Data 3/9/2016 Electronic File: 16- 15APB1 GR_ Res_ 24FEB2016_MD_FINAL_FIEL ,. D BHI CTK. iff AOGCC Page 3 of Monday, June 19, 2017 DATA SUBMITTAL COMPLIANCE REPORT 611912017 Permit to Drill 2151870 Well Name/No. PRUDHOE BAY UNIT 16-15A Operator BP EXPLORATION (ALASKA) INC. API No. 50.029-21474-01-00 MD 12600 TVD 8809 Completion Date Completion Status Current Status SUSP UIC No ED C 26905 Digital Data 3/9/2016 Electronic File: 16- 15APB1_GR_Res_24FEB2016_TVDSS_FINAL_. FIELD_BHI_CTK.tiff Well Cores/Samples Information: Name INFORMATION RECEIVED Completion Report YO Production Test Information Y Geologic Markers/Tops f Vi COMPLIANCE HISTORY Completion Date: Release Date: 10/28/2015 Description Comments: Compal Sample Interval Set Start Stop Sent Received Number Comments Directional / Inclination Data y r ) Mud Logs, Image Files, Digital Data Y (s) Core Chips Y /I Mechanical Integrity Test Information Y Q Composite Logs, Image, Data Files Core Photographs Y / Daily Operations Summary s Cuttings Samples Y /l./ Laboratory Analyses Y /L) Date Comments Date: �l I AOGCC Pagc 4 of -4 Monday, June 19, 2017 STATE OF ALASKA LASKA OIL AND GAS CONSERVATION COMMy' WEL--OMPLETION OR RECOMPLETION REPI_'AND LOG Is. Well Status: Oil ❑ Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended RI Well Class: 20AAC 25.105 20AAC 25.110 GINJ ❑ WINJ 111WAG ❑ WDSPL ❑ No. of Completions: Zero 11b. ' Development m Exploratory ❑ Service ❑ Stratigraphic Test ❑ 2. Operator Name: 6. Date Comp`Susp., or Abend.: 14. Permit to Drill Number/Sundry BP Exploration (Alaska), Inc 3/1312017 215-187 317-040 3. Address: 7. Date Spudded: 15. API Number: P.O. Box 196612 Anchorage, AK 99519-6612 2/21/2016 50-029-21474-01-00 - 4a. Location of Well (Governmental Section): 8. Date TO Reached: 16. Well Name and Number: 2/27/2016 • PBU 16•15A . Surface: 1417' FNL, 504' FWL, Sec. 24, T10N, RISE, UM 9 Ref Elevations KB 70 17. Field/Pool(s): Top of Productive Interval: 2233' FSL, 2989' FEL, Sec. 14, T10N, RISE, UM GL 38.7 BF 39.96. PRUDHOE BAY, PRUDHOE OIL - Total Depth: 3216' FSL, 2388' FEL, Sec. 14, TION, RISE, UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: ' 10624'/8651' ' ADL 028332 ' 4b. 4b. Location of Well (State Base Place Coordinates, NAD 27): 11. Total Depth (MD/TVD): 119. Land Use Permit: Surface: x- 719281 - y- 5929513. Zone - ASP 4 12600'18809' " 79-081 TPI: x- 715681 y- 5933061 Zone - ASP Total Depth: x- 716252 y- 5934060 Zone - ASP 4 12. SSSV Depth(MD/TVD): None 20 Thickness of Permafrost MD/D/D: 1900' (Approx.) 5. Directional or Inclination Survey: Yes ® (attached) No ❑ 13. Water Depth, if Offshore: 21. Re-ddlULateral Top Window Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) MD/IVD: 10822'/ 8802' - 22. Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs Within 90 days of completion, suspension, or abandonment. Whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary MWD/GR/RES 23, CASING, LINER AND CEMENTING RECORD CASING WT. PER FT GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE TOP BOTTOM TOP BOTTOM CEMENTING RECORD AMOUNT PULLED 20" 91.5# Hao 32' 112' 32' 112' 30" 325 sx Arctic Set 1 133/8" 68#/72# K -S 1-W 32' 2505' 32' 2505' 17-1/2" 2300 sx Permafrost E, 400 sx Permafrost C 9-5/8" 47# L -IID 30' 10789' 30' 8776' 12-1/4" 500 sx Class'G', 300 sx Permafrost C 7" 26#/29 L-sWNae 6008• 10822. 5409' 8802' 8-1/2" 2675. Class'G' 24. Open to production or injection? Yes ❑ No 0 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number): GRADEDEPTH SET (MO) PACKER SET (MDfrV 4-1/2" 12.6# 13Cr80 1 10648' 10592-18626' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. RECEIVED APR 0 7 2017 Was hydraulic fracturing used dumg completion? Yes ❑ No EI Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 10624' Set Plug - 0WG^� A"!. 1`/ 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation (Flowing, gas lift, etc.): N/A Date of Test: Hours Tested: Production for Test Period --► Oil -BW: Ga5-MCF: Water -Bbl: Choke Size' Gas -Oil Ratio: Flow Tubing Press Casino Press: Calculated 24 Hour Rate Oil -Bbl: Gas -MCF: Water -Bbl: Oil Gravity - API (cor): Form 10407 Revised 11/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only RDDMS LAPR 10 2017: .<� q. (:5 17 `-1 28. CORE DATA Conventional Corals) Yes ❑ No H . ( Sidewall Cores Yes ❑ No 0 If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MU TVD Permafrost - Top Well Tested? Yes ❑ No 0. Permafrost - Base If yes, list intervals and formations tested, briefly summarizing test results. Attach Top of Productive Interval 10873' 8840' separate sheets to this form, if needed, and submit detailed lest information per 20 AAC 25.071. Sadlerochit-Zone 4 10873' 8840' Formation at total depth: Zone 4 10873' 8840' ' 31. List of Attachments: Summary of Daily Drilling Reports, Post -Rig Work Summary, Survey, Wellbore Schematic Diagram Information b be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production Orwell test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Montgomery, Travis J Email: Travis.Montgomery&p.com Printed Name: Joe Last Title: Drilling Technologist Signature: Phone: +1907 564 4091 Date: 4 -ho INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-007 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item Is. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item lb. Well Class Service wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Forth 10.407 Revised 11!2015 Submit ORIGINAL Only 11\Q- N{iCV VT VOV9 WELLHEAD= MOEVOY ACTUATOR= BAKERC OKB. HEV = AY REF ELEV = 70• BF. ELEV = 39.96'. KOP= 3267' Max Angle = 50" Q 6700' Datum MD= 10937' Datum TVD 8800'SS X 7" ZXP L SUSPENDED 16-15A D=12.347" 1-1 2506' 17" LNR-TEBACK, 26#, L-80, .0383 bpf, D = 6276" 10674' Minimum ID = 3.726" @ 11039' 4-1@" HES XN NIPPLE 4-1/2" TBG, 12.6#, 13CR .0152 bpi, D= 3.958" 10646' 9-5/8" CSG, 47#, L-80 BTFtS. D = 8.661"1— 107 L/- BKK DELTA WS (01/23/16) H 10822' DUMP BAILED CMT(01/22/16) 10848' 7" POSISET FLUG(01/21/16) 10867• 7" PARTIALLY SET POSISET RUG (01/21116) 10869• PHRFORATON SUWMRY REF LOG: BHCS ON 12/14/85 ANGLE AT TOP PERF: 38" (x110870' Note: Refer to Production DB for historical pert data SIZE SPF INTERVAL OpNSgz SHOT SOZ 3-3/8" 4 10878 - 10891 S 07/09/86 10 3-31W 4 10879 - 10892 C 06/12/88 2 3-38" 4 10897 - 10915 C 06/12/88 M 3-3/8" 4 10918 - 10933 C 06/12/88 50 3-38" 4 10918 - 10933 S 07/09/86 4 3-38' 4 10936- 10949 C 06/12/88 M 3-38" 4 10936 - 10949 S 07/09/86 48 3-38" 4 10959 - 11006 C 06/12/88 6 3-31W 4 10959 - 11006 S 07/09/86 M 3-38" 6 11045 - 11065 C 08/13109 3-31W 2 11060 - 11066 C 10/19/92 3-38" 1/2 11060 - 11080 S 0623/86 3-38" 6 11075 - 11095 C 08/13/09 14-112" F 4-12" TBG D = 3.956• .0371 bpf, D = 6.184" 14-1/2- CAMO0 BAL-O SS5V W. D = 3.612" 1 GAS I FT MAmnRR S ST MD TVD I DEVI TYPE VLV LATCH PORT DATE 1 3309 3306 10 KBG2-LS DM1' M 0 08/20/06 2 3701 3686 17 KBG2-LS DMY M 0 05/29/14 3 6872 5987 50 KBG2-LS DMV M 0 05/29/14 4 9026 7503 44 KBG2-LS DMY M 0 03/05198 5 9733 7984 48 KBG2-LS DMY M 0 08/13106 6 10363 8430 41 KBG2-LS DMY M 0 03105/98 12" TIW HBBRT PKR D = 3.912" FES X NIP, D=3.813" 4.000" 1111666'J-yE MDTTNOTLOGGED MLLw;VW DOW (16-15A) 10826-1083 RETAINER I I I6 -15A PBI 4.25' TO OPEN HOLE TO OPEN HOLE I 11026" (—j7-X4.5-TWDPKR1D=3.946" 11039' 4-I/Y FES XN NP, D= 3.725" 11042' 4-12'TUBINC, TAL, D=3.854" 11042' B -M TT LOGG®0225/92 DATE REV BY I COMMENTS DATE REV BY COMMENTS 12/14185 ORIGINAL COMPLETION 03/07/16 TBIJMD FINAL ODE APPROVAL 12/18/91 F6V0 03/14/17 ZV/JP,D SET PX PLUG (03113117) 03105/98 WES LAST WORKOVE3R 0329/17 JNJJMD SET REF &BF ELEV 02/28116 NORDIC2 OPS SHUTDOWN(1615A) 03113117 SUSPEWED(16-15A) 03107/16 JMD DRLG HO CORRECTIONS PR DHOE BAY UNT WELL: 16-15A R37MT No: 12151870 AR No: 50-029-21474-01 Sec. 24, T10N, R15E, 1417" FN_ & 505' FWL BP Exploration (Alae ka) North America - ALASKA - BP Operation Summary Report Common Well Name: 16-15 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/18/2016 End Date: 2/27/2016 Project: Prudhoe Bay site: PB DS 16 Rig Name/No.: NORDIC 2 Spud Daternme: 11/25/1985 12:00 OOAM Rig Contractor: NORDIC CALISTA Active datum: orkb @70.O1 (above Mean Sea Level) Date From - To Him Task (i _ _ 2/18/2016 10:30 - 12:00 1.50 MOB Code NPT NPT Depth (usft) P __ _I —.. 1200. - 1400 200 MOB P 14.00 - 1600 2.00 MOB P Phase PRE PRE PRE 'All depths reported in Drillers Depths' Page i of 18 AFE No X3 -0171,49-C: (2,588,122,00) Rig Release: 2/28/2016 BPUOL —� Description of Opereeons RIG RELEASED FROM 16-17 AT 1030 HRS. PREPARE FOR MOVING RIG OFF OF 16-17. COMPLETE PREP OF RIG AND SITE. - PJSM FOR MOVING RIG OFF OF 16-17; DISCUSSION FOCUSED ON: PLACING PHYSICAL BARRIERS (12"X12" CHOCK) IS IN PLACE TO PREVENT THE RIG FROM ROLLING BACK TOWARDS TREE/WELLHEAD. ESD IN CELLAR IS FUNCTION TESTED AND MANNED BY THE FIELD SUPERINTENDENT RADIO COMMUNICATION VERIFIED FOR ALL INDIVIDUALS INVOLVED IN THE MOVE (SPOTTERS. ETC). THE AGREED PHYSICAL SIGN "COMMAND" TO STOP THE RIG MOVE IS UNDERSTOOD BYALL MOVE RIG OFF WITH NO ISSUES, PAD OPERATOR ON SITE TO MONITOR MOVE OFF. STAGE ON PAD. REPAIR SUCTION LINE IN PIT 1 - CHARGED MAINTENANCE TO NORDIC - CONDUCT ROUTE DRIVE WHILE REPAIR IS BEING COMPLETED PJSM FOR MOVING RIG ACROSS PAD. DISCUSS OBSTACLES, APPROACH TO WELL 16-15. -MOVE RIG ACROSS PAD. STAGE IN FRONT OF WELL 16-15. PJSM ON MOVING OVER WELL, PLACING PHYSICAL BARRIERS (12"X12" CHOCK) IS IN PLACE TO PREVENT THE RIG FROM ROLLING BACK TOWARDS TREE/WELLHEAD. ESD IN CELLAR IS FUNCTION TESTED AND MANNED BY THE FIELD SUPERINTENDENT RADIO COMMUNICATION VERIFIED FOR ALL INDIVIDUALS INVOLVED IN THE MOVE (SPOTTERS, ETC). THE AGREED PHYSICAL SIGN "COMMAND" TO STOP THE RIG MOVE IS UNDERSTOOD BY ALL MOVE OVER WELL WITH NO ISSUES. PAD OPERATOR ON LOCATION DURING MOVE OVER. Printed 3/30/2017 9:56:02AM *All depths reported in Drillers Depths` North Amenca - ALASKA - BP Page 2 of 18 Operation Summary Report - - Common Well Name: 18-15 -- - - AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/18/2016 End Date: 2/27/2016 X3-017H9-C¢ (2,588,122.00 ) Project: Prudhoe Bay Site: PB DS 16 -- Rig Name/No.. NORDIC 2 Sputl DateRlme: 11/25/1985 12:00:OOAM Rig Release: 2/28/2016 Rig Contractor NORDIC CALISTA BPUOI: Active datum: orkb @70.00usft (above Mean Sea Level) Date From - To Hnt Task Code NPT NPT Depth Phase Description of Operations -_ (hr) (usfry_ 16:00 - 22:30 6.50 MOB P - PRE CREW CONTINUING WITH RIG UP AND I COMPLETING RIG MOVE CHECKLIST (GREASING VALVES, PREPARING EQUIPMENT, CHANGING OUT EQUIPMENT) - RIG ACCEPT AT 16:30; CONTINUE WITH RIGGING UP FOR OPERATIONS - CYCLE TREE VALVESAND SSV, 1200 PSI ON TREE CAP BUT BLED OFF IMMEDIATELY (MOST LIKELY THERMAL) - CONDUCT LEAK TIGHT TEST AGAINST SWAB / MASTER GOOD TEST -NIPPLE DOWN TREE CAP / NIPPLE UP BOPE -AOGCC JEFF JONES WAIVED WITNESS AT 1600 j -SPACE OUTAND SET LUBRICATORS -TREE WARMING UP. BLEED THERMAL PRESSURE OFF BETWEEN MASTER AND SWAB -SET TEST PLUG 22'.30 - 23:00 0.50 MOB P PRE PERFORM H2S / RIG EVACUATION DRILL PERFORMAAR. NEED TO GET TRAILER FOR DRILLERS SIDE. WITH WIND BLOWING FROM CELLAR TO EDGE OF PAD. TASK SCS WITH GETTING ANOTHER TRAILER DISCUSSED EMERGENCY NUMBERS FOR J_ THE EOA/ HARMONY RADIO USAGE 23:00 - 00:00 1 1.00 MOB P PRE FILL STACKAND PREP FOR BOPE SHELL TEST. 2/19/2016 00:00 - 02:00 2.00 BOPSUR P PRE PRESSURE STACK UP, GRAYLOCK LEAKING ON. BLEED DOWN. FIX. FLANGE ON CHOKE MANIFOLD LEAKING. PRESSUREUP. LEAKBETWEEN ANNULAR/TOT _ I _ PERFORM PASSING SHELL TEST 250#/4500# Printed 3/30/2017 9:56:02AM *All depths reported in Drillers Depths` North America - ALASKA - BP Page 3 of 18 Operation Summary Report Common Well Name: 16-15 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/182016 End Date. 2/27/2016 X3-017H9-C: (2,588,122.00 ) Project: Prudhoe Bay SRe: PB DS 16 Rig Name/No.. NORDIC 2 Spud Date/Lme: 1125/1985 12:0O:OOAM Rig Release: 2/28/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: orkb @70.00usfl (above Mean Sea Level) -- Date From -To Him Task Code NPT NPT Depth Phase Desaiption of Operations (hr) (us6) .... _ 02:00 - 06:00 4.00 BOPSUR P I PRE START BOPETEST. CONDUCT INITIALTESTS FROM DRILLERS CONSOLE. TEST #1 250# / 4500# PASS- SHELL TEST CM# 9, 10, 11, 13 LUBRICATOR AND MM-3 TEST #2 250# / 3500# PASS- BLINDS, KILL HCR, CM# 3.4,8.7,12. 11, BOP 17 AND SAFETY VALVE #1 TEST #3 250# PRESSURE NOT STABILIZING. LOW PT VISIBLE FLUID COMING OUT TATTLE TAIL (BLINDS FAILED. WILLCONTINUE TESTING OTHER COMPONENTS) TEST #3 250# / 350010 (BLINDS OPEN) PASS. KILL MANUAL, CM# 1,2,6, 11,12 BOP 18, SAFETY VALVE #2 (X-OVER LEAKED. ISOLATE FROM SAFETY VALVE) TIGHTEN CROSSOVER TO SAFETY VALVE #2 TEST #4 2500 13500# (BLINDS OPEN) PASS- KILL MANUAL, CM# 1,2, 5, 11, 12 SAFETY VALVE #2 PULL NIGHT CAP, PICKUP 2-3/8" TEST JOINT. CLOSE LOWER 2-3/8" COMBINATION PIPE/SUP TEST #5 250# / 3500# PASS-2-3/8" CONDUCT ACCUMULATOR DRAWDOWN TEST FROM OPERATIONS CAB REMOTE PANEL CLOSE ANNULAR ON 2-3/8" TEST JOINT TEST #6 250# 12500# PASS - CONDUCT PRE-SPUD MEETING WITH DAY CREW 06:00 - 12:30 8.50 BOPSUR P PRE DISCUSSANNULAR TEST REQUIRMENTS WITH TOOLPUSHER. AOGCC PERMIT REQUIRED 2500 PSI TEST, RE-TEST ANNULAR WITH 2-3/8" TESTJOINGAND WITH 3-1/2" TEST JOINT TO 3500 PSI PER BP WELL j PLAN REQUIREMENT, GOOD TESTS. - CONTINUE WITH BOP TEST PER AOGCC, BP, AND NORDIC REQUIREMENTS TO 250 PSI LOW/3500 PSI HIGH. ALLSUCCESSIVE TESTS PASSED. 12:30 - 13:30 1.00 BOPSUR P PRE PJSM FOR HANDLING INJECTOR, STABBING ON FOR TESTING COILAND INNER REEL IRON. DISCUSS PRESSURESAT RIG FLOOR AND IN REELHOUSE, WEAK LINKS, WHERE TEST WILL BE RECORDED. - STAB ON, BREAK CIRCULATION AND PRESSURE TEST INNER REEL VALVE TO 250 PSI LOW/ 3500 PSI HIGH. GOOD TEST. 13:30 - 14:15 0.75 BOPSUR P PRE _ VALVE CREW ON LOCATION TO CONFIRM TREE HEIGHTS, CONFIRM TORQUE ON TREE BOLTS. TREE TORQUE GOOD, POP OFF WITH INJECTOR AND STAND ASIDE. Printed 3/30/2017 9:56:02AM 'All depths reported in Drillers Depths' North America -ALASKA - BP Page of 18 Operation Summary Report Common Well Name: 16-15 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/18!2018 Entl Date: 2/27/2018 X3 -017119-C: (2,588,122.00) __ Projecl:Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 2 Spud DateTme: 11/25/1985 12.00:OOAM Ria Release 2/28/2018 Active datum: orkb _@70.00us8 (above Mean Sea Level) BPUOI Date From - To Him Task Code NPT NPT Depth Phase Description of Operations (.2 _ (usft) 14:15 - 17:30 3.25 BOPSUR P _ PRE PJSM WITH VALVE CREW ON MOBILIZING LUBRICATOR TO RIG FLOOR. DISCUSS LIFT AND TASK LEADER. MOBILIZE TO FLOOR. - PJSM ON NU OF LUBRICATOR, PRESSURE TEST, PULLING TWC. - NU LUBRICATOR, PRESSURE TEST TO 250 PSI LOW/ 3500 PSI HIGH. TEST PER CRITERIA IN WELL PLAN, GOOD TEST. - PULLTWC, 70 PSI UNDER TWC. PICK UP ABOVE VALVES, CLOSE IN FOR ISOLATION FROM WELL, BLEED PRESSURE. MONITOR VOID THROUGH WING VALVE, ND LUBRICATOR. - MOBILIZE LUBRICATOR OFF OF RIG 17:30 - 18:15 1 0.75 RIGU P PRE CONDUCT H2S RIG EVAC DRILL WITH DAY CREW. CONDUCTAAR. 1815 - 1920 1.08 RIGU P PRE CIRCULATE DIESEL OUT OF REEL 1920 - 20:00 0.67 RIGU P PRE PJSM, REVERSE CIRCULATE E -LINE. POP OFF WELL, TAKE NOZZLE OFF STAB BACK ON. REVERSE CIRCULATE, WIRE MOVING. 20:00 - 21:40 1.87 RIGU P PRE PJSM FOR CUTTING COIL, BLOW FLUID BACK FOR COIL CONNECTOR INSTALL. POP OFF INSTALL NIGHT CAP. CUT 270'OF PIPE. INITIATED HOT WORK FOR DRESSING COIL AND BOOTING CABLE. CONNECTOR INSTALLED. PULLTESTT041K INSTALL NOZZLE AND PUMP CABLE FORWARD. 2140 - 00:00 2.33 RIGU P PRE TEST E -LINE GOOD -MAKE UP BHI UQC -GOOD TEST ON UQC -STAB ON WELL/ FILL COILAND STACK. 2/20/2016 00:00 - 01:30 1.50 RIGU P PRE PERFORM PT OF LUBRICATOR BREAK/ FLOATS -LOW/HIGH 250#/3500# CHARTEDPASS. -OPEN WELL TO CLOSED CHOKE. PRESSUREAT30# -BLED OFF, PRESSURE CAME BACK UP TO 30#. CHECK AT NEEDLE VALVE ON INJECTOR. GAS -OPEN CHOKE AND LEFT OPEN TO TIGER TANK, FLOW BLED DOWN THEN STARTED INCREASING. -FLOW VERIFIED AT TIGER TANK. SHUT IN AND PREPARE FOR BOTTOM KILL. _ PRESSURE WAS 70# WHEN WE SHUT IN. 01:30 - 04:00 2.50 CONDHL P PRE LEAK TIGHT MASTER/SWAB. GOOD TEST. POP OFF INJECTOR AND MAKE UP NOZZLE ASSEMBLY. WATER TEMP ON KCLAT 77 DEG. ORDERED 1% SLICK KCL WITH SAFELUBE AT 140 DEG. EXTRA METHANOL PUP ORDERED OUT, ARRIVED ON LOCATION. FINISH SPOTTING IN BLEED TANK FULL METHANOL PUP. 04:00 - 06:15 2.25 CONDHL N WAIT PRE WAITING ON WARM KCL. TAKE ON MUD INTO PITS, DOUBLE CHECK LINE-UPS FOR CIRC OUT. TRUCK ON LOCATION. - MONITOR WELLTHROUGH WING VALVE SENSOR, 125 PSI ON WELL. Printed 3/30/2017 9:56.02AM 'All depths reported in Drillers Depths' North Amenca-ALASKA - BP Operation Summary Report Common Well Name: 16-15 Event Type: RE-ENTER- ONSHORE (RON) L Start Date: 2/18/2016 End Date: 2/27/2016 Project Prudhoe Bay Site: PB DS 16 - - Rig Name/No.: NORDIC 2 Spud Data/Time: 11/25/1985 12:00:OOAM Rig Contractor: NORDIC CALISTA AFE No X3 -017H9 -C: (2,588,122.00 ) Rig Release: 2/28/2016 Page 5 of 18 Active datum: orkb @70.00usft (above Mean Sea Level Date From - To Him Task Code NET NPT Depth Phase Description of Operations (hr) (usft) 0615 - 07.15 1.00 CONDHL P PRE BRING TRUCKAROUND, STAGE UP. COMPLETE PERMITS, CHECK WEIGHT, RU LINES. PJSM ON PUMPING OPERATION, FLUID SEQUENCE, DISPLACEMENT PATH. 07:15 - 12:15 500 CONDHL P PRE FILL COIL WITH 15 BBLS METHANOL FOLLOWED BY WARM 8.35 PPG KCL. PLACE METHANOLAT NOZZLE. CLOSE IN WING VALVE, OPEN UP WELLTO TESTED INJECTOR AND CLOSED CHOKE. 121 PSI ON WELL. OPEN CHOKE TO FLOW BACK TANK - BREAK CIRCULATION WITH FLUIDS AND RIH AT MIN RATE WHILE HOLDING BACKPRESSURE THROUGH CHOKE - TAKE GASEOUS FLUID RETURNS TO FLOW BACK TANK WHILE RIH. NO ENCOUNTER WITH ANY HYDRATES. -APPROACH WHIPSTOCK DEPTH, PUW AT WHIPSTOCK 47K, MOVE DOWN AND TAG WHIPSTOCK AT 10,833' UNCORRECTED MD AND SET DOWN 2K. - PICK BACK UP AND BRING PUMPS UP TO 5 BPM INITIAL RATE TO CIRCULATE WELL FROM BOTTOM WITH 8.35 PPG KCL. CIRCULATING PRESSURE AND WELLHEAD PRESSURE DROPPING EQUALLY, IN AND OUT RATES MOVING TOWARDS BEING 1 FOR 1 AS THE 8.35 PPG FLUID IS CIRCULATING OUT THE WELLBORE FLUID. DENSITY OUT INITIALLY 7.3 PPG, RISING WITH CIRCULATION. - KCLALL THE WAV AROUND, IN AND OUT WITH 8.30 PPG KCL, MAINTAIN 250 PSI BACKPRESSURE. SWAP TO 9.5 PPG MUD SYSTEM, CIRCULATE DOWN. CONTINUE CIRCULATING HOLDING BACKPRESSURE, MW IN 9.45 PPG, MW OUT 8.3 PPG. - CONTINUE CIRCULATING, MW IN 9.55 PPG, MW OUT 8.35 PPG WITH MUD COMING OUT OF NOZZLE. - 1 FOR 1 RETURNS WITH MUDALL THE WAY AROUND, 9.55 PPG IN AND 9.50 PPG OUT. FLOW CHECK, WELL DEAD. - BLOW DOWN CHOKE AND HARD LINE TO BLOW BACK TANK, FLUSH MICROMOTION, PJSM FOR POH 12.15 - 1415 2.00 CONDHL P PRE POH WITH NOZZLE BHA, RETURNS ARE 1 FOR 1 WITH 9.50 PPG MUD ALLTHE WAY AROUND. PJSM FOR LAYING DOWN BHAAND MAKING UP MILLING BHA WHILE TRIPPING I OUT. PULL TO SURFACE, FLOW CHECK, WELL IS NOT FLOWING. - POP OFF WITH INJECTOR _ 14'.15 - 1440 042 STWHIP P WEXIT BREAK OFF AND LAY DOWN NOZZLE BHA MU 3.80" MILLING BHA WITH STRAIGHT MOTOR ONTO BHI SMART TOOLS. WINDOW MILL GAUGE 3.80" GO, STRING REAMER GAUGE AT 3.79" GO. - WELL STATIC, FLUID AT SURFACE "AAI depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Page 6 of 18 Common Well Name: 1615 1 ATE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/182016 End Date: 2/272016 X3 -017H9 -C: (2,588,122.00 ) Project: Prudhoe Bay - - - - Site: PB DS 16 _ - - -- Rig Name/No.: NORDIC 2 Spud DateTme: 11/25/1985 12:00:OOAM Rig Release: 228/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: orkb @70.00usft (above Mean Sea Level) Date From - To HIM Task Code NPT NPT Depth Phase Description of Operations _� (hr) _- -e (us 14:40 - 16:45 2.08 STWHIP P WEXIT _ STAB ON WITH INJECTOR. ZERO COUNTER, PT OTS TO 250 PSI LOW WHILE WAITING ON EDC TO OPEN. BREAK CIRCULATION, RIH, j HIGH PRESSURE TEST OF OTS WHILE RIH. - 9.45 PPG MW IN AND OUT, i FORT RETURNS - SLACK OFF WEIGHT AT BOTTOM 23K, PICK UP WEIGHT 46K,CIRCULATION PRESSURE OF 825 PSI AT.55 BPM WITH EDC OPEN 16:45 - 18:00 i 1.25 STWHIP P WEXIT LOG PRIMARY DEPTH CONTROL FROM 10,600' WITH NO CORRECTION. PICK UP AND LOG CCL FROM 10,500'. 1118:00 - 00:00 6.00 STWHIP P WEXIT CLOSE EDC. GET DRILLING PARAMETERS FREE SPIN =2908 PSI AT 2.86 BPM RATE IN = 2.85 BPM RATE OUT = 2.85 BPM MWIN=9.46PPG MWOUT=9.41PPG ECD = 10.58 PPG ROP = 1 FPH WOB = 1-2K CIRC PSI = 2906 3100 PSI j IAP =364 PSI OAP =520 PSI PVT =298 BBLS TAGGED PINCH POINTAT 10826.1' MILL WINDOW FROM 10826 TO 14832 2/21/2016 00:00 - 03:45 3.75 STWHIP P WEXIT FREE SPIN=2830 PSI AT 2.86 BPM RATEIN=2.85BPM RATEOUT=2.85BPM MWIN=9.46PPG MWOUT=9.41PPG ECO = 10 58 PPG 03:45 - 05:00 1.25 STWHIP 05:00 - 06:45 1.75 STWHIP 06:45 - 08:45 2.00 STWHIP ROP=IFPH WOB=01K CIRCPSI=2900- 3100 PSI IAP = 364 PSI OAP = 520 PSI PVT = 297 BBLS MILL WINDOW FROM 10,832'- 10834.5 STRING REAMER EXIT 10835.5 SAMPLE SHOWING METAL/CHERT/SHALE _ P WEXIT START DRILLING RATHOLE FREE SPIN =2775 PSI AT 2.86 BPM RATE IN = 2.83 BPM RATE OUT = 2.85 BPM MWIN=9.45PPG MWOUT=9.41PPG ECD = 10.57 PPG ROP =IFPH WOB =0-2.5K CIRC PSI 2775 2960 PSI IAP =98 PSI _OAP =82 PSI PVT =297 BBLS P WEXIT PU OFF BOTTOM, BACKREAM, WOB ZERO OFF BY 6.6K. ZERO. START REAMING WINDOW. NOTHING SEEN ON FIRST UP PASS. 2728# @ 2.87 BPM FREE SPIN SENT 10 BBLS LOVIS / 10 BBLS HIVIS SWEEP -CONDUCT FINAL REAM PASS AND THEN DRY DRIFT, BOTH GOOD PASSES. PICK UP INTO WINDOW WITH HI -VIS SWEEPAROUND AND UP, FLOW CHECK. FLOW CHECKGOOD. OPEN EDC, POH AT 3.0 BPM. - MW IN 99.45 PPG, MW OUT 9.42 PPG P WEXIT POH WITH MILLING BHA, 1 FOR 1 RETURNS ON TRIP OUT OF HOLE. - PJSM FOR CHANGING OUT BHA. PULL TO 200', FLOW CHECK WELL. ALL GOOD. - PULL TO SURFACE, POP OFF WITH INJECTOR. Printed 3/3012017 9:56:02AM `All depths reported in Drillers Depths' Printed 3/30/2017 9:56:02AM 'All depths reported In Drillers Depths' North America - ALASKA - BP Page 7 of 18 Operation Summary Report Common Well Name: 16-15 ALE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/18/2016 End Date: 2/272016 X3 -017H9 -C: (2,588,122,00) ProjeU: Prutlhoe Bay Site: PB DS 16 Rig Name/No.: NORDIC 2 Spud Date/Time: TI -/25/198512 00 OOAM Rig Release: 2/28/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: orkb @70.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations _ (hr) _ _ _ (usft) 08.45 - 09:45 _ 1.00 DRILL P PROD1 BREAK DOWNBHA. WINDOWMILL GAUGE I AT 3.80" GO, 3.79" NO-GO. STRING REAMER LOOKS GOOD. - SHIFT BHA COMPONENTS AROUND, MU 3.75" BY 4.25" BUILD BHA ONTO 3.0° BENT MOTOR WITHOUT RESISTIVITY TOOL - STAB ON WITH INJECTOR, PRESSURE TEST QUICK TEST SUB WHILE EDC IS BEING CLOSED AND MECHANICAL COUNTER RESET 09:45 - 11:45 2.00 DRILL P PROD1 RIH WTH DRILLING BHA. PRESSURE TEST QTS TO HIGH WHILE RIH. 11:45 - 12:30 0.75 DRILL P PROD1 LOG TIE-IN TO PDC, -3' CORRECTION. CONTINUE TO RUN DOWN TO WINDOW. 12:30 - 18:00 5.50 DRILL P PROD1 FREE SPIN OF 2820 PSI AT 2.86 BPM. ON BOTTOM AT 10,243'. TOOK SEVERAL PICKUPS TO ENSURE ORIENTATION WAS ON TARGET AND TO NOT STALL DIFFERENTIALLY. - INITIAL IA PRESSURE AT 60 PSI, ROSE TO ! 200 PSI; INITIAL OA PRESSURE AT 95 PSI, ROSE TO 250 PSI ! - FLOW RATE OF 2.82-2.95 PSI, CIRC PRESSURE OF 2785-3700 PSI, WOB 1.65-4.8K - MW IN 9.47 PPG, MW OUT 9.43 PPG, ECD OF 10-6 PPG - NO LOSSES TO FORMATION -CONDUCT KICK WHILE DRILLING DRILL WITH NEW FLOORHAND ON TEAM. SIMULATED INCREASE IN PIT GAIN. CREW RESPONDED ACCORDING TO STANDING ORDERS. GOOD JOB IN MONITORING FOR FLOW, SIMULATING INCREASE IN FLOW, SHUTTING IN AND MAKING NOTIFICATIONS. CONDUCT AAR TO DISCUSS STANDING ORDERS WITH NEW FLOORHAND (ROTARY EXPERIENCE, NEW TO COIL SO STANDING _ORDERS ARE DIFFERENT). 18:00 - 00:00 6.00 DRILL P PROD1 DRILLED BUILD FROM 10940' TO 11168' FREE SPIN =2750 PSI AT 2.80 BPM RATE IN=2.80 BPM RATE OUT =2.80 BPM MWIN=9.50PPG MWOUT=9.47PPG ECD = 10.58 PPG ROP=60FPH WOB=0-5K CIRCPSI= 2750- 3200 PSI IAP =400PSI CAP =492 PSI PVT =435 BBLS LOST BBLS TO FORMATION 2/22/2016 00:00 - 02:40 2.67 DRILL P PROD1 DRILLED BUILD FROM 11168' FREE SPIN =2750 PSI AT 2.80 BPM RATE IN=2.80 BPM RATE OUT =2.80 BPM MWIN=9.48PPG MWOUT=9.47PPG ECD = 10.68 PPG ROP = 60 FPH WOB = 0-5K CIRC PSI = 2750- 3200 PSI IAP =400PSI CAP =492 PSI PVT =424 BBLS LAND BUILD SECTION LOST 11 BBLS 02.40 - 02'.50 017 DRILL P PROD? PERFORM 10 MIN DYNAMIC FLOW CHECK. 0.80 BPM IN / 0.74 BPM OUT PULLING AT 8' / MIN GOOD DYNAMIC FLOW CHECK Printed 3/30/2017 9:56:02AM 'All depths reported In Drillers Depths' North America -ALASKA - BP Operation Summary Report Page 8 of 18 Common Well Name: 16-15 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/18/2016 End Date: 2/27/2016 X3 -017H9 -C: (2,588,122.00 ) ProjecC Prudhoe Bay Site: PB DS 16 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1985 12:00:OOAM Rig Release: 2/28/2016 Rig Contractor. NORDIC CALISTA BPUOI: Active datum: orkb @70.00usg (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations .. __ _ _ _ (hQ (usft) 02:50 - 03:15 0.42 DRILL P PROO1 PULL OUT OF HOLE FOR LATERAL BHA 2.89 BPM IN / 2.76 BPM 9.50 PPG IN 19.45 PPG OUT PULL TO WINDOW, OPEN EDC. JET CASING SLOWLY WITH 10 BBLS HIVIS UP TO TUBING TAIL. 03:15 - 05:50 2.58 DRILL P PROD1 4.14 BPM IN / 3.60 BPM OUT 9.54 PPG IN / 9.44 PPG OUT PULLED 407MIN FOR FIRST 1000' 1 CONTINUE OUT OF HOLE 05:50 - 06:30 0.67 DRILL P PRODi _ PERFORM 10 MIN FLOW CHECK CLOSE EDC / POWER TOOL DOWN - PJSM ON LAYING DOWN AND CHANGING ' OUT MOTOR BEND - POP OFF WITH INJECTOR AT 0630 06:30 - 07:45 1.25 DRILL P PROD1 LAY DOWN BUILD SECTION BHA. BIT GRADE 1 -1 -NO. CHANGE OUT MOTOR BEND TO 1.7° BEND, MU RE -RUN HYCALOG 3.75" X 4.25" BIT ONTO BHI SMART TOOLS WITH RESISTIVITY._ 07:45 - 12:30 _ _ _ _ 475 DRILL P F _FPROD? STAB ON WITH INJECTOR, PRESSURE TEST QUICK TEST SUB TO LOW OF 250 PSI WHILE EDC IS BEING CLOSED, COUNTERS ZEROED. - BREAK CIRCULATION, IMMEDIATE RETURNS. WELL STATIC. - RIH WITH BHA, PRESSURE TEST QUICK TEST SUB TO HIGH OF 3500 PSI WHILE RIH. - LOG TIE-IN WITH -e' CORRECTION - CONTINUE TO MOVE DOWN, LOG MAD PASS FOR GEO AND MWD_ 12:30 - 18:00 1 5.50 1 DRILL P PROD1 ON BOTTOM AT 11,273. INITIAL FREE SPIN OF 2990 PSI AT 2.82 BPM. DRILL AHEAD DIRECTIONALLY. - INITIAL IA PRESSURE OF 0 PSI, OA PRESSURE OF 175 PSI - MW IN 9.51 PPG, MW OUT 9.47 PPG, 1 FOR 1 RETURNS DURING INITIAL DRILLING - DRILLED AT 2.81-2.86 BPM, 32203700 PSI, WOB 1-2.7K - MW INCREASED TO 9.53 PPG IN, 9.48 PPG OUT, ECD ROSE FROM 10.65 PPG TO 10.78 PPG - BEGAN SEEING SLIGHT LOSSES TO FORMATION AT 11,420' - IA PRESSURE ROSE TO 415 PSI, OA ROSE TO 520 PSI 1800 - 2015 2.25 DRILL P PROD1 CONTINUE DRILLING AHEAD IN LATERAL SECTION FREE SPIN =2990 PSI AT 2.80 BPM RATE IN=2.81 BPM RATE OUT =2.80 BPM MWIN=9.51PPG MWOUT=9.47PPG ECD = 10.80 PPG ROP = 60-100 FPH WOB = 0-5K CIRC PSI = 2750- 3400 PSI IAP =477PSI CAP =593 PSI PVT =400 BBL DRILLING AHEAD AVERAGING 13° DOGLEGS. STARTING TO FALL BEHIND DIRECTIONALLY. DECISION TO PULL TO INCREASE MOTOR BEND Printed 3/30/2017 9:56:02AM *All depths reported in Drillers Depths' 20'.35 North America - ALASKA - BP Page 9 of 18 DRILL P Operation Summary Report - 23:40 Common Well Name: 16-15 DRILL P A F E No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/18/2016 End Date: 2/27/2016 X3-017H8-C: (2,588,122,00) Project: Prudhoe Bay Site: PB DS 16 1.00 Rig Name/No.: NORDIC 2 Spud DateMme: 11/25/1985 12:0O:OOAM Rig Release: 2/28/2016 Rig Contractor: NORDIC CALISTA _ WELLSTATIC. PULLTO SURFACE BPUOI: _ Active datum: orkb @70,00usft (above Mean Sea Level) Date From- To Hrs Task Code NPT NPT Depth Phase Description of Operations --- (hr) _ 1120:15 - 20:35 0.33 __ (usft) DRILL P PROD1 - _._-- _ PERFORMEMIC FL_OW CHECK D DYNA 20'.35 - 23'.30 2.92 DRILL P 3:30 - 23:40 0.17 DRILL P 23:40 - 00:00 0.33 DRILL P 2/23/2016 00:00 - 01:00 1.00 DRILL P 2.17 DRILL P 0.33 DRILL P 0.50 DRILL P 04:00 - 09:00 01:00 - 03:10 I_ 03:10 - 03:30 03:30 - 04:00 2.17 DRILL P 0.33 DRILL P 0.50 DRILL P 04:00 - 09:00 5.00 DRILL P 09:00 - 10:45 1.75 DRILL P Printed 3/30/2017 9:56:02AM *All depths reported in Drillers Depths' 0.60 BPM IN/ 0.54 BPM OUT 9.47 PPG IN / 9.48 PPG OUT GOODFLOWCHECK PROD? _ WIPERTOWINDOW OPEN EDC, INCREASE RATE TO 4 BPM. PULL 407 MIN FOR 1,000' ABOVE WINDOW PJSM WITH NEW CREW MEMBERS AT 2500' FOR SWAPPING BHA'S PROD1 PERFORM 10 MIN FLOW CHECK. WELLSTATIC. PULLTO SURFACE PROD1 LAY DOWN BHI MOTOR TO REBEND. BIT GRADE 1 -1 -NO PROD1 LAY DOWN BHI MOTOR. INCREASE BEND FROM 1.7° TO 2.0" AKO. RERUN SAME BIT. MAKEUP BHA #5 AND STAB INJECTOR. PT OTS LOW/ HIGH WHILE POWERING UP TOOLS AND OPENING EDC PROD? RIH WITH BHA#5 1 0.65 BPM IN / 1.18 BPM OUT RIH SPEED -100'/MIN 9.45 PPG IN 19.48 PPG OUT IA / OA = 100# / 437# PROD1 LOG FORMATION TIE IN -8.5' CORRECTION PROD? CLOSE EDC. RUN THROUGH WINDOW. 0.74 BPM IN / 0.87 BPM OUT 9.47 PPG IN / 9.47 PPG OUT RUN THROUGH EXPOSED SHALES. WEIGHT BOBBLE/MOTOR WORK AT -11050' PROD1 BACK ON BOTTOM WITH BHA. FREE SPIN OF 3020PSIAT2.84BPM. DRILLAHEADIN LATERAL FROM 11,6001. - DRILLAHEAD AT 2.85 BPM, 3250 PSI, 2-2.7K WOB - MW IN 9.51 PPG, MW OUT 8 48 PPG, ECD OF 10.8 PPG - SIGNIFICANT LOSSES BEGAN AT 11,849'. FOLLOW WELL PLAN FOR LOSS MANAGEMENT, LINE UP AND PUMP ACROSS TOP TO ENSURE HOLE FILL, FULL PITS AND FLUID IN TRUCK ON LOCATION AND TRUCK BEING FILLED AT MUD PLANT. PROD1 DRILL AHEAD WITH JUST UNDER FULL LOSSES. CLEAR INDICATION ON LOGGING OF FORMATION BREAKAT 11,849'. - DRILL AT 2.80 BPM, PUMP ACROSS TOP AT .58 BPM, RETURNS OF .65 BPM. RAPID ROP AT 130 FPH. - FILLACROSS TOP, ORDER OUTADDITIONAL TRUCKING. DRILL TO 12,000', CALCULATE FLUID ON LOCATION AND DECIDE TO CONDUCT WIPER TO WINDOW UNTIL SECOND TRUCK ARRIVES ON LOCATION. Printed 3/30/2017 9:56:02AM *All depths reported in Drillers Depths' North America -ALASKA - BP Operation Summary Report Page 10 of 18 Common Well Name: 16-15 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/18/2016 End Date: 2/27/2016 X3 -0171-19-C: (2,588,122.00 ) Project: Prudhoe Bay Site: PB DS 16 Rig Name/No.: NORDIC 2 Spud DateRme: 11/25/1985 12:00:OOAM Rig Release: 2/28/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: orkb @70.00usft (above Mean Sea Level) Date From - To Hm Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10:45 - 11:00 0.25 DRILL P PROD? PICKUP OFF BOTTOM CLEAN, IPCXUP WEIGHT ON TRIP TO WINDOW 47-50K. MAINTAINING 2.80 BPM TO CLEAN UP HOLE AND PUMPING ACROSS TOPAT.6 BPM WITH A RETURN RATE OF .85 BPM. - REDUCE RATE TO 1.95 BPM, 1650 PSI, AND PUMP ACROSS TOP AT .60 BPM WITH _ RETURN RATE OF .72 BPM 11:00 17:30 6.50 DRILL N DPRB 12,000.00 PROD1 ABOVE WINDOW. OPEN EDC. • -REDUCE RATE TO 0.53 BPM DOWN COIL AND 0.92 BPM ACROSS THE TOP WITH RETURNS OF 0.57 BPM. -DYNAMIC LOSS RATE AT WINDOW 0.89 BPM / 54 BPH _.. -CON_TINUE TO WAIT ON TRUCKING 17:30 - 20:00 2.50 DRILL P 12,000.00 PROD1 CLOSE EDC. TIE-IN DEPTH FROM 10860 FT. CORRECT -5 FT. TAG BOTTOM AND DRILL FROM 12,003 FT. INITIAL ROP IS 100 FT/HR WIT 2-3K DWOB. DRILLAT 2.86 BPM + 0.42 BPM KILL LINE, GETTING 0.55 BPM BACK. _ DRILL TO 12,135 FT. 20:00 - 22:30 2.50 DRILL P 12,000.00 PROD1 PICK UP FROM 12,135 FT FOR BHA WIPER. -CLEAN PICKUPAROUND 50K. -CONTINUE DRILLING FROM 12,135 FT WITH ROP 100-120 FT/HR. -LOSSES INCREASING. ECD FALLINGAWAY. INCREASE TOP HOLE FILL TO 0.6 BPM. LOSSES AT 3.5 BPM -WIPER UP ACROSS LOSS ZONES. MINOR OVERPULLS AND MOTOR WORK. CONTINUE WIPER TO WINDOW. 22:30 - 23:00 0.50 li DRILL P 12,000.00 PROD1 STARTED PULLING HEAVYAT 10900' - MOTOR WORK AND OUT RATE INCREASED. STARTED PACKING OFF, RIH TO FLUFF CUTTINGS. PULL BACK UP __ HOLE. THROUGH WINDOW WITH NO ISSUE. 23:00 - 00:00 1.00 DRILL P 12,000.00 PRODI DROP RATE DOWN COIL. PUMP ONLY SPORADICALLY TO KEEP PIPE WARM PUSH LOSSES DOWN BACKSIDE TO FLUSH REMAINING CUTTINGS IN 7" INTO FORMATION AT 2.2 BPM.____ 2/24/2016 00:00 - 01:30 1.50 DRILL P PROD? _ LOG TIE IN -4.5 1 _.._ RUN BACKTO BOTTOM _. _ 01:30 - 04:00 _ _ _ 2.50 DRILL P PROD1 TAG EARLYAT 12,200' FRACTURE ZONE. PICKUPAND SPIN BIT GET BACK TO BOTTOM. TAGAT 12262'. DRILLAHEAD WITH MULTIPLE WIPERS. DRILLED AHEAD WHILE AVERAGING-1507HR LOSING 2.86 BPM DOWN COIL+ 0.60 BPM DOWN BACKSIDE. ECD AVERAGING 8.99 PPG OR 4070# MUD WEIGHT IN 9.44 PPG Printed 3/30/2017 9:56:02AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Pagel t of 18 Common Well Name: 16-15 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/18/2016 End Date: 2/27/2016 X3 -0171-19-C: (2,588,122.00 ) Project: Prudhoe Bay Site: PB DS 18 - - - -- Rig Name/No.: NORDIC 2 Spud DatefTime: 11/25/1985 12:00:OOAM Rig Release: 2/28/2016 Rig Contractor: NORDIC CALISTA BPUO1: Active datum: orkb Q70.00usft (above Mean Sea _ _ Level) Date I From -To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:00 - 05:00 1.00 DRILL P PROD1 PUMP 10 BELS HI VIS SWEEP START WIPER UP THTOUGH THIEF AT 12,200'^ AND 10,850'- OVERPULLING /MOTOR WORK INCREASING. WORKAREA UPAND DOWN TO SWEEP CUTTINGS TO THIEF ZONES. li GEOLOGY MAPPED FRACTURES AT 11849', 11912',12086'.12230- 1912',12086',12230'05:00 05:00- 07:20 2.33 DRILL P PROD? DRILLINGAHEAD IN 2200# AT 2.88 BPM PUMPING 0.38 BPM DOWN BACKSIDE TO KEEP HOLE FULL 9.44 PPG IN / 9.38 PPG DWOB 4-5K. 42N SHALE CAME IN EARLY. AT 12,590 FT PUMP 10 BBLS HI -VIS SWEEP, PREP FOR WIPER TRIP BACK TO WINDOW. --09 -3 DRILL 7O 12,600 FT. 0720 2.17 DRILL P PROD1 _ LONG WIPER TRIP BACK TO WINDOW. TIE-IN DEPTH, CORRECT+7 FT. NO ISSUES SEENAT WINDOW OR OTHER SHALE ZONES GOING UP. RUN IN WITH REDUCED PUMP RATE, SETDOWNS AT 10990 FT, 11040 FT, 11100 FT, 12225 FT GOING DOWN. 0930 - 11:00 1.50 DRILL P PROD1 DRILL FROM 12,600 FT TO TO OF 12,710 FT. HAVE REACHED DIRECTIONAL OBJECTIVES FOR THE WELL, HOWEVER SOR OBJECTIVES HAVE NOT BEEN ACHIEVED. 11:00 - 13:30 2.50 DRILL C PRODI CLEAN AND CONDITION HOLE FOR EITHER BILLET OR RUNNING LINER. DISCUSS WITH AND ODEABOUT SETTING BILLET. PULL BACK TO WINDOW AND TIE-IN DEPTH, CORRECT+SFT. RUN BACK TO BOTTOM, SET DOWN AT 12,225 FT, PICK UP AND BOUNCE THROUGH. TAG BOTTOM AT 12,710 FT, CORRECTED DRILLED DEPTH. 1330 - 16:10 2.67 DRILL C PRODI PULLBACK TO WINDOW FOR 2ND WIPER TRIP. SEE ONLY SLIGHT WEIGHT BOBBLES THROUGH SHALE ZONES. AT WINDOW, RUN BACK IN WITH REDUCED PUMP RATE THROUGH BUILD SECTION. MINOR SET DOWNS AT 11030 FT, 11240 FT. 16:10 - 2005 392 DRILL C PRODI POOH LAY IN ALPINE BEAD PILL. OVERPULLAT 12,190 FT THEN CLEAN TO WINDOW. PULLTHROUGH WINDOWAND OPEN EDC. JET WHIPSTOCK TRAY WITH OPEN EDC, JET 7" CASING. FLAG PIPEAT 10,288 FT EOP. Pnnted 3/30/2017 9:56:02AM "All depths reported in Drillers Depths' North America - ALASKA - BP Page 12 of 18 Operation Summary Report —_ Common Well Name: 16-15 AFE No — Evem Type: RE-ENTER- ONSHORE (RON) Start Date: 2/18/2016 End Date: 2/272016 X3 -017H9 -C: (2,586,122.00) Project: Prudhoe Bay Site. PB DS 16 Rig Name/No.: NORDIC 2 Spud DaleRme: 1125/1985 12:OO:OOAM Rig Release: 2/282016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: orkb @70.00usft (above Mean Sea Level) Date From - To Him Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:05 - 00:00 3.92 DRILL C PROD? ESTABLISH LOSS RATE ACROSS THE TOP 2/25/2016 0000 - 00:30 0.50 DRILL C 00:30 - 01:00 T 0.50 DRILL X i DPRB 01:00 - 03 00 DRILL X DPRB 03'.00 - 03050.08 ORILL X DPRB 0305 - 05:00 1.92 j DRILL X DPRB 0500 - 06:00 100 06:00 - 06:40 0.67 DRILL X DPRB DHB X DPRB romea 3/3012017 9:56:02AM *All depths reported in Drillers Depths` -4.1 BPM LOSS RATE. PJSM TO DISCUSS POWER ASSIGNMENTS WHILE UTILIZING BOTH PUMPS. -ESTABLISHED STABLE HOLE FILL. BREAK OFF INJECTOR. LAY DOWN BHA BIT GRADED 3 -1 -BT -INSTALL NIGHTCAP. CIRCULATEACROSS THE TOP, MAINTAINING HOLE FILL. -PERFORM CHROME MANAGEMENT. CUT 1 00'OF COILAND BEHEAD. TESTED E -LINE. -PULL TEST CTC 38K, PTCOILCONNECTOR 300/3800. -INSTALL UOC WITH FLOATS. PRESSURE TESTING FLOATS AT REPORT TIME. _ PROD? FLOATS PASSED LOW/ HIGH CHARTED TEST. PROD1 PJSM, MAKEUP BHA#5, STAB ON WITH INJECTOR RIH TO 100'. OPEN EDC. SET PUMP TRIP AT 1000# START CIRCULATING DOWN COIL. 1.30 BPM / 1.50 BPM IN 0.75 BPM OUT 9.45 PPG IN 19.38 PPG OUT PROW RIH START 140* DEG 1% KCL DOWN COIL PROW LOG TIE IN WITH -8' CORRECTION PROD? RIH TO 10800', JUSTABOVE WHIPSTOCK 50K PICKUP WEIGHT. PUMP 140° 1% KCL INTO OPEN HOLE. PUMP 170 BBLS 0.82 BPM (9.5 MUD) FILLING FROM TOP. 1.60 BPM (8.3 1% KCL) GOING DOWN COIL TOTAL LOSS RATE AT WINDOW 2.41 BPM AT WINDOW ANNULAR PRESSURE: 4050#, BORE PRESSURE: 4059# PRODI _ SPOT 16 BBLS 9.5 MUD OVER GOOSENECK. COME OFFLINE WITH COIL PUMP. CLOSE EDC. MAKEUP HOLE FILL PUMPING ACROSS THE TOP. MAINTAIN HOLE FILL DOWN BACKSIDE WHILE RIH TO SET DEPTH. LOSSES 2.22 BPM IN /0.25 BPM OUT. LOSSES 2.0 BPM RIH WEIGHT 27K PROD1 RIH WEIGHT 25K PU WEIGHT 48K RIHTO11784.45' PUTO40K LOSS RATE AT SET DEPTH 1.5 BPM ANNULAR 4031#/ BORE 4031# INCREASE PRESSURE TO CIRC PRESSURE TO 1018# ANNULAR 4282# / 4937# 646# DIFFERENTIAL. IMMEDIATELY GET 1:1 RETURNS ACROSS TOP. WAIT FOR RETAINER ELEMENTS TO INFLATE. romea 3/3012017 9:56:02AM *All depths reported in Drillers Depths` North America - ALASKA - 3P Operation Summary Report Page 13 of 18 Common Well Name: 16-15 i - 09:40 2.17 AFE No Event Type: RE-ENTER- ONSHORE(RON) Start Date: 2/18/2016 End Date: 2/27/2016 X3 -017H9 -O(2,588,122.00) Project: Prudhoe Baw i6 X DPRB Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1985 12:00 OOAM Rig Release: 2/28/2016 Rig Contractor: NORDIC CALISTA FUNCTION TEST BOPS FROM DRILLER'S BPUOI: Active datum: orkb @70.00usR (above Mean Sea Level) Date From -To Him Task Code NPT NPT Depth Phase Description of Operations (hr) _ .. �._ (usft) 06:40 - 07:30 0.83 DHB X DPRB ' PROW - ___ - INCREASE CT PRESSURE 7O 1500 PSI. RIH SET 3K DOWN 07:30 i - 09:40 2.17 DHB X DPRB 09:40 - 10:30 0.83 DHB X DPRB PRESSURE UP TO 2000 PSI CT PRESSURE, BALL SEAT SHEARS OUT. PICK UP TO 60K TO UNSTING FROM RETAINER. PICK UP ANOTHER 20 FT ABOVE RETAINER. INCREASE PUMP RATE DOWN CT TO 2.5 BPM WITH 2.34 BPM RETURNS. REDUCE RATE BACK TO 1 BPM AND POOH. DYNAMIC FLOW CHECK IS GOOD WHILE POOH. PROD1 JET WHIPSTOCK TRAY WITH OPEN EDC. POOH. _ PROD? CONDUCT PJSM FOR CHANGING OUT BHA WHILE POOH. TRIP SHEET IS -5 BBLS TO THIS POINT. 10 MIN PUMPS OFF FLOWCHECK AT SURFACE IS GOOD, NO FLOW. TAG STRIPPER AND UD RUNNING TOOLS. ALL TOOLS HAVE FUNCTIONED NORMALLY. INJECTOR OFFAT 10:00. WHILE UD TOOLS CONDUCT KICK WHILE TRIPPING DRILL WITH ELLINGTON CREW. BOP HORN IS SOUNDED JUSTAFTER REMOVING INJECTOR. CREW PULLS INJECTOR TO SIDE, INSTALLS AND TORQUES LIFTER AND REMOVES BHA FROM STACK. Printed 3/30/2017 9:56:02AM *All depths reported in Drillers Depths* SIMULATE SHUTTING IN WELL, DRILLER � CLOSES IN AS PER STANDING ORDERS. DRILL IS ENDEDAT THIS POINT, BRIEF AAR ON RIG FLOOR, 10:30 - 10:50 0.33BOPSUR P PROD1 FUNCTION TEST BOPS FROM DRILLER'S STATION. 10:50 - 14:00 3.17 DRILL C PROD1 - M/U BHA ll BILLET. M/U INJECTOR, ON AT 11:05. TEST QTS, TEST BHI, OPEN EDC, ZERO COUNTERS, RIH. PUMP 0.6 BPM 1600 PSI THROUGH OPEN EDC._ 14.00 - 15:10 1.17 DRILL C PROD1 LOG TIE-IN FROM 10660 Ff, CORRECT +8 FT. RIH TO WINDOW AND CLOSE EDC. PASS THROUGH WINDOW, RIH. MINOR SETDO WN AT 11,100 FT OTHERWISE CLEAN PASS TO SETTING DEPTH. STOPAT 11,662.1 FT LEAVES BILLET TOPAT 11,650 FT AT 129R. PRESSURE UP TO SET BILLET, SHEARSAT 4100 PSI. x15:10 - 18:00 2.83 DRILL C PROD1 _ DYNAMIC FLOW CHECK JUST OFF BOTTOM IS GOOD, 0.53 / 0.49 BPM AT 2 FT/MIN. PULL THROUGH WINDOW AND POOH. AFTER PULL THROUGH WINDOW CONDUCT RIG EVAC EXERCISE WITH ELLINGTON CREW ANDAARAFTER. CONTINUE POOH. AT SURFACE, 10 MIN FLOWCHECK IS GOOD, NO FLOW. Printed 3/30/2017 9:56:02AM *All depths reported in Drillers Depths* North America - ALASKA - BP Page 14 of 16 Operation Summary Report Common Well Name: 16-15 20:00 - 00:00 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/18/2016 End Date: 2/27/2016 X3 -017H9 -C: (2,588,122.00 ) Project: Prudhoe Bay ay S ite: PB DS 16 06:00 -LOG TIE IN WITH -7' CORRECTION Rig Name/No.: NORDIC 2 Sputl DaleRme: 17/25/7985 72:00:OOAM Rig Release: 2/28/2016 Rig Contractor: NORDIC CALISTA 11651.7' BPUOI: Active datum: orkb @70.00usft (above Mean Sea Level) 2.83 BPM IN / 2.83 BPM OUT Date From - To Him Task Code NPT NPT Depth Phase Description of Operations (hr) FIRST SIGN OF MOTOR WORK / WOB AT (usft) 11650.4' 18:00 - 20:00 2.00 f DRILL C PROD1 CREW CHANGE. PJSM FOR MOVING DEPARTURE OFF BILLET INJECTOR /SWAPPING BHA'S 2.84 BPM IN /2.84 BPM OUT INJECTOR OFF 18:50. LAY DOWN BILLET 03'.30 20:00 - 00:00 4.00 DRILL C 2126/2016 00:00 - 03:30 3.50 DRILL C 03'.30 - 06'.00 2.50 DRILL C I I - 12:20 i - 07:00 1.00 DRILL C 06:00 I 107:00 - 10:20 3.33 7ORIILL c� I I 12:20 - 16:20 4.00 CI -. DRILL C SETTING TOOLS. MAKE UP BHA #8 10:20 - 12:20 2.00 DRILL 12:20 - 16:20 4.00 CI -. DRILL C Printed 3/30/2017 9:56:02AM *All depths reported in Drillers Depths' SETTING TOOLS. MAKE UP BHA #8 INJECTOR ON 20:00 PROD1 RIH -PERFORM H2S RIG EVACUATION DRILL -LOG TIE IN WITH -7' CORRECTION -CLOSE EDC AND RUN TO BOTTOM PRODi RECORD PARAMETERS. DRY TAG BILLETAT 11651.7' 2.83 BPM AT 3075# FREE SPIN. 2.83 BPM IN / 2.83 BPM OUT 9.52 PPG IN / 9.45 PPG OUT PU WEIGHT471</RIH WEIGHT 20K FIRST SIGN OF MOTOR WORK / WOB AT 11650.4' TIME MILL PER BHI REP. PROD1 NEAR BIT DROPPING ANGLE. GOOD DEPARTURE OFF BILLET 3050# AT 2.84 BPM FREE SPIN 2.84 BPM IN /2.84 BPM OUT 9.51 PPG IN / 9.46 PPG OUT MOTOR WORK AVERAGE BETWEEN 200-500# ROP INCREASING AS WE GET MORE DEPARTURE FROM BILLET. DWOB 1-2.5K PROD1 DRILLED TO 11778'. GETTING CLEAN SURVEYS 17 DEG. PICK UP WHILE DO CALCULATES FUTURE TRAJECTORY, TO DECIDE IF MORE MOTOR BEND IS NEEDED, DISCUSS WITH ODE AND GEO, DECIDE TO DRILLANOTHER 22 FT TO CONFIRM DLS. PROD? _ DRILL FROM 11,780 FT. DLS IS AVERAGING 19 DEG/100 FOR LAST 3 SURVEYS. AT 11847 FT STALLAND PICK UP, START LOSING FLUID. MAKE NOTIFICATIONS, CONTINUE DRILLING. FLUIDS SUPPORTALREADY ON LOCATION. PUMP 10 BELS HI-VISAROUND AT 11920 FT. DRILLING WITH GOOD ROPAT 2.8/ 0.64 BPM DRILLTO 11950 FT PROD1 WIPER TRIP FROM 11950 FTTO WINDOW. REDUCE RATE PULL ACROSS BILLET NO ISSUES. TIE-IN DEPTH, CORRECT+6 FT. CONTINUE WIPER TRIP TO BOTTOM. REDUCE PUMP RATE IN BUILD SECTION, SET DOWN 2 TIMES IN SHALE _AT_11,100 FT. _ PROD1 DRILL FROM 11,950 FT. ROP IS 60 - 90 FT/HR WITH 2-4K DWOB. HOLD 90L TF FOR NOW TO CONTINUE LONG LH TURN AND STAY IN POLYGON. 2.89 / 1.42 BPM IN / OUT 9.56 / 9.56 PPG. AT 12,100 FT PUMP ANOTHER 10 BBLS HI -VIS SWEEPAROUND. AFTER 12,180 FT ROP SLOWS WITH WEIGHT STACKING. DRILL TO 12,186 FT. Printed 3/30/2017 9:56:02AM *All depths reported in Drillers Depths' North America -ALASKA- BP Operation Summary Report Page 15 of 18 Common Well Name: 16-15 Printed AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/18/2016 End Date: 2/27/2016 X3 -017H9 -C: (2,588,122.00) Project: Prudhoe Bay Site: PB DS 16 Rig Name/No.: NORDIC 2 Spud DateTme: 11/25/1985 12:00:OOAM Rig Release: 2/28/2016 Rig Contractor. NORDIC CALISTA _ BPUOI: Active datum: orkb @70.00usR (above Mean See _ _ Level) Date From - To Him Task Code NPT NPT Depth Phase Description of Operations 16:20 - 18:00 1.67 DRILL C PROD1 PULL WIPER TRIP TO WINDOW. REDUCE PUMP RATEACROSS BILLET, NO ISSUES. I PULL TO WINDOWAND TURN AROUND, REDUCE PUMP RATE DOWN THROUGH BUILD SECTION. STACK WEIGHTAT 10985 FT, 11040 FT, 11100 FT, 11240 FT, 11270 FT 18:00 - 19:50 183 DRILL C PRODI _ DRILL FROM 12,180 FT 7O 12228' 2.93/1.14 BPM, 9.57/9.55 PPG. INITIAL FOR IS AROUND 60 FT/HR WITH 2-3K DWOB. PERFORM SHORT WIPERS. DISCUSS WITH GEOLOGY_ 1950'. - 0000 4.17 DRILL C PROD1 WEATHER WENT PHASE II. DISCUSS WITH CH2 TRUCK PUSHER/SUPERINTENDENT PRIOR TO CUTTING LAST HIGH LOSS FAULT WIPER UP TO ACROSS FAULT ZONE/BILLET/ WINDOW TIE IN / DROP RATE TO MITIGATE LOSSES TO 1 BPM / 60 BPH TRUCKS HAVE CONVOY NOW. PUT ANOTHER TRUCK ON. DISCUSS WITH TRUCK PUSHER AND DISPATCH. PUT 2 PICKUPS ON TO CONVOY TRUCKS. ROADS AND PADS CLEARING MAIN ROAD. DISCUSSED WITH CH2 DISPATCH. CH2 NOT TAKING ICE ROAD DUE TO DECREASE VISIBILITY. FLUIDS GETTING CAUGHT UP �.00 _ _ _ LOG TIE IN -11 2/2712016 00:00 - 01:00 DRILL C I� PROD1 CAUGHT UP WITH WITH FLUID SUPPORT. 01:00 - 02:10 1.17 DRILL C PRODI CLOSE EDC, RIH TO BOTTOM 9.51 PPG IN / 9.47 PPG OUT PUMP MINIMUM RATE THROUGH SHALES. SAT DOWN AT 11,050', 11,105',11,250' 02'.10 - 03'.15 1 08 DRILL C PROW DRILL LATERAL SECTION 12236' TO 12332' FREE SPIN = 3075PSI AT 2.85 BPM RATEIN=2.85BPM RATEOUT=0.94BPM (LOSSES 115 BPH) MWIN=9.56PPG MWOUT=9.50PPG ECD = 10.57 PPG MW TEMP IN= 93.3 DEG MW TEMP OUT= 82.5 DEG BHT= 126 DEG ROP=FPH WOB=2-4K CIRCPSI=3530 PSI IAP=OPSI OAP=OPSI PVT=216/211 BBLS LOSSES GRADUALLY GETTING WORSE AS WE DRILLAHEAD. STARTED WITH 1158BLS /HR, NOW UP TO 140 BELS/HR GEOLOGY CONFIRMED FRACTURES AT 11847', 11952',12080',12140',12245- 1952',12080',12140',12245' Printed 3/30/2017 9.56:02AM 'All depths reported in Drillers Depths' North America - ALASKA - BP Page 16 of 18 Operation Summary Report Common Well Name: 16-15 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/18/2016 End Date'. 2/27/2016 X3 -017119-C: (2,588.122o0) Project: Prudhoe Bay Site: PB DS 16 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1985 12:00:00AM Rig Release: 2/28/2016 Rig Contractor: NORDIC CALISTA _ _ BPUOI: Active datum: orkb (gD70.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth (h0 (usft) 03:15 - 05:30 2.25 DRILL C 05:30 - 06:30 1.00 DRILL C 0630 - 0900 I 2.50 DRILL C 09.00 - 09:50 0.83 DRILL C 09.50 - 11:40 l 1.83 DRILL C Phase Description of Operations PROD? DRILL LATERAL SECTION 12332' TO 72408' FREE SPIN = 3075PSI AT 2.85 BPM RATEIN=2.85BPM RATEOUT=0.51BPM (LOSSES 156 BPH) MWIN=9.52PPG MWOUT=9.47PPG ECD = 10.34 PPG MWTEMPIN=99.7DEG MWTEMPOUT=89.7 DEG BHT= 122DEG WOB=1.8-2.OK CIRCPS1=3530PSI IAP =O PSI CAP =O PSI PROD? DRILL LATERAL SECTION 12408'-12430' FREE SPIN = 2875PSI AT 2.85 BPM RATE IN = 2.85 BPM RATE OUT = 0.30 BPM (LOSSES 157 BPH) MWIN=9.56PPG MWOUT=9.50PPG ECD = 10.46 PPG MWTEMPIN=88.1DEG MWTEMPOUT=82.6 DEG BHT=124 DEG WOB = 24 K CIRC PSI = 3069 PSI IAP = 0 PSI OAP = 0 PSI DISCUSS WITH GEOLOGY WHAT WE ARE SEEING. CONTINUE WITH PLAN DRILL TO 12480 FT. PROD1 CONTINUE DRILLING FROM 12,480 FT, LOW ROP DRILLING WITH NEGATIVE 1OK-14K STRING W -r. DRILLAT 175L TF TO TRV AND REDUCE INCLINATION AS QUICKLYAS POSSIBLE. AT 12,540 FT PUMP 10 BBLS LO / HI VIS SWEEPS, PULL 150 FT WIPER TRIP. DRILL TO 12,570 FT. PROD1 CONTINUE DRILLING WITH LOW ROP FROM 12,570 FT. CONDUCT FREQUENT SHORT WIPER TRIPS. WHILE DRILLING CONDICT KICK WHILE DRILLING EXERCISE WITH ELLINGTON CREW. DRILLER NOTICED INCREASED OUT FLOW, ASKS FOR FLOW CHECK. FLOW CHECK SHOWS WELL FLOW (SIMULATED) WELL IS SHUT IN AS PER STANDING ORDERS. DRILL IS ENDED ATTHIS POINT, HOLDAAR. DRILL TO 12,600 FT. _ PROD? LONGWIPERTOWINDOWAND TIE-IN DEPTH. START DRAGGING ABOUT 5-7K FROM 11790 FT. RUN BACK IN AND PULL THROUGH AGAIN. PULLING HEAW AGAIN AT 11750, RUN BACK IN, PUMP 12 BBLS HI -VIS PILLAROUND, CONTINUE CYCLING PIPE WORKING BACK UP TO WINDOW. DRAGGING AT 11715 FT, RUN BACK IN. DRAGGING AGAIN AT 11670 FT, RUN BACK IN. PULL PAST BILLET STILL DRAGGING, SLOW DOWN PULLING SPEED INCREASE PUMP. CONTINUE WIPER TRIP, MINOR OVERPULLS SEEN AT BUILD SECTION SHALES. Printed 3/30/2017 9:56:02AM *Ali depths reported in Drillers Depths' North America - ALASKA - BP Operation Summary Report Common Well Name: 16-15 Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/18/2016 Eno Date. 2/27/2016 Project: Prudhoe Bay Site: PS DS 16 AFE No (2,588,122,00) Page 17 of 18 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1985 12:00:OOAM Rig Release: 2@8/2016 Rig Contractor. NORDIC CALISTA BPUOP Active datum: orkb � (above Mean Sea_ Level) Data From - To Ars Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) -2.33 _ 11:40 - 14:00 I DRILL C PROD1 PULLTHROUGHWINDOWANDOPENEDC. JET7"CASINGAT3.01/0.57BPM. LOG TIE-IN, CORRECT+14 FT. RIH, 0.5 BPM THROUGH BUILD SECTION. STACK WTAT 11040 FT, 11100 (7 TIMES). CANT PASS THIS SPOT TRY VARIOUS RUNNING SPEEDS AND PUMP RATES, AS DRILLEDTF, PICK UP AND BUILD SPACER FOR PUMPING MINERAL OIL. WHILE WAITING, TRY 2 MORE TIMES TO WORK PAST, NO LUCK. PINCH IN CHOKE, PUMP DOWN KILL LINE GET 500 PSI WIER TRY TO PASS 2 MORE TIMES, AS DRILLED TF, 0.3 BPM DOWN CT, NO LUCK. 1400 - 1445 0.75 DRILL C PRODt DISCUSS PLAN FORWARD WITH CTD SI AND ODE. PJSM THEN PUMP MINERAL OIL DOWN CT TO TRYAND PASS SHALEAT 11,100 FT. PUMP 15 BELS KCL, 10 BELS OIL, 15 BBLS KCL. RIH STACK Wr 11100 FT. PICK UP AND PUMP 2 BBLS OIL OUT. RIH TRY TO PASS 2 MORE TIMES 60 FT/MIN AND 30 FT/MIN, AS DRILLED TF NO LUCK. PUMP 6 MORE BELS OUT, RIH AND TRY 2 MORE TIMES TO PASSATAS DRILLED TFAND OL TF. PUMP 2 MORE BELS OUT, RIH AT OL TF 2 MORE TIMES, NO LUCK. 14:45 - 15:30 0.75 DRILL C _ PROD1 PICK UPAND GO TO DRILLING PUMP RATE. EASE DOWN TO 11,100 FTATAS DRILLED TF. STALL MOTOR TWICE, FINALLY PUSH THROUGH. PICK BACK UP THROUGH, TRY TO PASS AGAIN 2 TIMES CAN'T PASS AT FULL RATE OR AT REDUCED RATE. EASE DOWN, STALL EACH TIME. STALL e TIMES AT 11,100 FT NOTABLE TO PASS. STALLS GETTING PROGRESSIVELY SHALLOWER. 15:30 - 17:00 1.50 DRILL C PROD1 DISCUSS WITH ODE, DECIDE TO SETA BILLET. CLEAN AND CONDITION WELLBORE DOWN TO BILLET SETTING DEPTH. PULL THROUGH WINDOW AND OPEN EDC, JET WHIPSTOCK TRAY. POOH. 17:00 - 19:05 2.08 DRILL P _ PROO1 WHILE POOH RECEIVE WORD FROM ODE TO RDMO. COST OF FURTHER OPERATIONS NOT JUSTIFIED BYACCESSIBLE RESERVES CONTINUE OUT OF WELL. STOPAT200'. VERIFY LOSS RATE 1.7 BPM, TAG UP AND BLOW DOWN BHA. LAY DOWN. _ BIT GRADED 1 -1 -NO 19'.05 - 22:30 3.42 DRILL P PRODi OFFLOAD LINER WHILE WAITING ON 1% KCL DIESEL vrmteo 3/30/2017 9:56:02AM 'All depths reported in Drillers Depths` North America -ALASKA - BP Operation Summary Report Page 18 of 18 Common Well Name: 16-15 AFE No Evert Type: RE-ENTER- ONSHORE (RON) Start Date: 2/18/2016 End Date: 2/27/2016 X3 -0171-19-C: (2,588,122.DO ) Project: Prudhoe Bay - -- Site: PB DS 18 -- Rig Name/No.: NORDIC 2 Spud Date/Time: 1125/1985 12:00:OOAM Rig Release: 2/28/2016 Rig Contractor. NORDIC CALISTA BPUOI: Active datum: orkb @70.00usft (above Mean Sea Level) Date From- To Hrs Task Code NPT NPT Depth Phase Description of Operabons 22:30 - 00:00 1.50 DRILL P PROD? PJSM FOR SWAPPING WELL OVER TO KCL PER APPROVED OCN#4 REVIEW X -CHECK. SET PARAMETERS FOR BULLHEADING KCL BULLHEAD 226 BBLS OF 1% KCL COME ONLINE 2.85 BPM @ 996# 3.09 BPM A 1106# WITH 226 BBLS AWAY. Printed 3/30/2017 9:56:02AM 'All depths reported in Drillers Depths` Printed 3/30/2017 9:56:48AM •AII depths reported in Drillers Depths' North America - ALASKA - BP Page 1 of 1 Operation Summary Report Common Well Name: 16-15 AFE No Event Type: COM- ONSHORE (CON) Start Date: 2/28/2016 End Date: 2/28/2016 X3 -017H9 -C: (1,744,878.00 ) Project: Prudhoe Bay Site: PB DS18 Rig Name/No.. NORDIC 2 Spud Date/Time: 11/25/1985 12:00:OOAM Rig Release: 2/28/2016 Rig Contractor: NORDIC CALISTA BPUOI: Active datum: orkb @70.00usft (above Mean Sea Level) Date From- To Him Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/28/2016 00:00 - 01:15 1.25 DEMOB C POST _ SWAP TO DIESEL. PUMP 38 BBLS DIESEL / 3 BBLS METHANOL FOR TREE FINAL PRESSURE WAS 200#, FALLING. SHUT MASTER/SSV ,01:15 - 04:15 3.00 DEMOB C POST PJSM WITH N2 PUMPERS. WSL WITNESSED PT/PRESSURETEST SPEAR WITH 5 BBLS METHANOL COME ONLINE WITH NITROGEN AT 1800 SCF BYPASS OUT MM WHEN 2/3 REEL VOLUME OUT. LET NITROGEN BLEED DOWN. VALVE CREWARRIVED. GREASE SWAB/ SSV/MASTER. CLOSEALLVALVES 04:15 - 06:00 1.75 DEMOB POST _ VERIFY NITROGEN BLED OFF PICK INJECTOR OFF. BREAKDOWNBHA#9 PUT INJECTOR ON LEGS. PERFORM LEAK TIGHT TEST. PREPARE TO NIPPLE DOWN BOPE 06:00 - 09:30 3.50 DEMOB C POST OPEN VBR DOORS AND INSPECT BOPS, NOTHING UNUSUAL SEEN. REPLACE VBR DOORS. REMOVE BOPS AND INSTALLTREE CAP, DUMP 1 BOTTLE HEET ON TOP OF SWAB. VISUAL LEAK TIGHT TEST ON TREE CAP, RESULTS NO LEAKS OBSERVED. "' RELEASE RIG AT 09: 30 "' ALL FURTHER INFORMATION ON 03-21 REPORT. Printed 3/30/2017 9:56:48AM •AII depths reported in Drillers Depths' Daily Report of Well Operations PBU 16-15A ACTIVITYn ATF of uAwnv ***WELL SHUT IN ON ARRIVAL*** (Secure Well) DRIFT W/ 3.80" G. RING, 4-1/2" BRUSH, S. BAILER & TAG @ 10825' MD (CORRECTED) BRUSHED X -NIPPLE @ 10624' MD RAN BP TANDEM SBHPS GAUGES ACCORDING TO PROGRAM LRS LOAD TBG. W/ 220 BBLS CRUDE SET 4-1/2" PX PLUG IN X -NIPPLE @ 10624' MD 3/13/2017 LRS PERFORM PASSING CMIT - T x IA TO 2500 PSI 0= 0/0/0. Temp= S/I (LRS Unit 76 -Assist Slickline: Load and Test) Loaded TBG with Ibbl of Meth followed by 220 bbls of Crude. Slickline set plug. CMIT-TxIA test # 2 *** PASSED *** @ 2455 TBG & 2469 IA psi. (Target pressure) 2275 psi, (Max pressure) 2500 psi, First 15 min. the IA loss 14 psi and the TBG loss 24 psi. The second 15 min. the IA loss 12 psi and the TBG loss 13 psi. For a total loss of 26 psi on the IA and 37 psi on the TBG. Pumped a total of 9.7 bbls of Crude down IA to reach Max Test Pressure. Bled pressures down to 300 psi ** PER S.Line WSL *** 6.7 bbls. 3/13/2017 RDMO: SVWVSSV,MV= SLICKLINE, IA,OA=OPEN North America - ALASKA - BP Prudhoe Bay PB DS 16 16-15 16-15APB1 500292147470 Design: 16-15APB1 Final Survey Report 02 March, 2016 ri.2 BAKER HUGHES by BP FUN Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PS DS 16 Well: 16-15 Wellbore: 1615APB1 Design: 16-15AP81 Local Co-ordinate Reference: Well 1615 TVD Reference: orkb @ 70.00usft - MD Reference: orkb @ 70.00usft North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Project Prudhoe Bay, GPS, PRUDHOE BAY Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sao Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 16, TR -1615 Site Position: 718,969.880 usk From: Map Position Uncertainty: 0.00 usk Well 16-15,16-15 Well Position -NI-S 0.00 usft +E/ -W 0.00 usft Position Uncertainty 0.00 usk Wellbore 16-15APB1 Magnetics Model Name Sample Date BGGM2015 2/1/2016 Design 16-15APB1 Audit Notes: Version: Phase: Vertical Section: Depth From (TVD) (usft) 3004 Northing: 5,927,441.990 usft Easting: 718,969.880 usk Slot Radius: 0.000 in Northing: 5,929,512.670 usft Easting: 719,280.830 usft Wellhead Elevation: 39.96 usft Latitude: Longitude: Grid Convergence: Declination Dip Angle Field Strength 1°I 1°I (nT) 19.38 81.03 57,552 ACTUAL Tie On Depth: 10,800.00 +N/ -S -E/-W Direction (usft) (usft) (I 000 0.00 30.00 Latitude: Longitude: Ground Level: 70° 12'15.545 N 148° 14'4.567 W 1.66 ° 70° 12' 35.816 N 148° 13'53,802 W 7 36.69usft 3/2/2016 3:44:37PM Page 2 COMPASS 5000.1 Build 61 by BP Final Survey Report BAKER HUGHES Company: North America -ALASKA -BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: Orkb @ 70.00usft Site: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15APB1 Survey Calculation Method: Minimum Curvature Design: 16-15APB1 Database: EDM R5K- Alaska PROD - ANCP7 Survey Program Date 3/2/2016 From To (usft) (usft) Survey (Wellbore) Tool Name Description 100.00 10,800.00 GyroData Gyro (16-15) GYD-CT-CMS Gyrodata cont.casing nVs 10,820.00 12,660.53 CTK MWD 4-1/4"(16-15APB7) MWD MWD -Standard Survey MD Inc AS (azimuth) TVD TVDSS N/S ENV Northing Easting DLeg V. Sec (usft) (°) f 1 (usft) (usft) (usft) (usft) (usft) (usft) ('1100usft) (usft) 30.04 0.00 0.00 30.04 -39.96 0.00 0.00 5,929,512.870 719,280.830 0.00 0.00 100.00 0.21 282.32 100.00 30.00 0.03 -0.13 5,929,512.894 719,280.704 0.30 200.00 0.38 258.69 200.00 130.00 0.00 -0.63 5,929,512.853 719,280.201 0.21 -0.04 300.00 0.32 247.60 300.00 230.00 -0.17 -1.21 5,929,512.665 719,279.623 0.09 -0.31 -0.75 400.00 0.55 227.06 399.99 329.99 -0.60 -1.82 5,929,512.214 719,279.026 0.27 -143 500.00 0.47 216.10 499.99 429.99 -1.26 -2.42 5,929,511.539 719,278.452 0.13 -2.30 600.00 0.49 165.33 599.99 529.99 -2.01 -2.55 5,929,510.790 719,278.341 0.41 -3.01 700.00 0.52 148.46 699.98 629.98 -2.81 -2.20 5,929,510.000 719,278.709 0.15 -3.53 800.00 0.37 165.20 799.98 729.98 -3.49 -1.83 5,929,509.331 719,279.102 0.16 -3.94 900.00 0.53 144.01 899.96 829.98 -4.15 -1.42 5,929,508.676 719,279.528 0.18 -4.31 1,000.00 0.52 137.07 999.97 929.97 4.86 -0.84 5,929,507.987 719,280.129 0.06 -4.63 1,100.00 0.38 145.44 1,099.97 1,029.97 -5.47 -0.35 5,929,507.396 719,280.644 0.15 -4.91 1,200.00 0.43 102.25 1,199.97 1,129.97 -5.82 0.21 5,929,507.060 719,281.209 0.30 1,300.00 0.48 85.93 1,299.96 1,229.96 -5.87 0.99 5,929,507.033 719,281.994 0.14 -4.93 4.59 1,400.00 0.43 79.70 1,399.96 1,329.96 -5.77 1.78 5,929,507.152 719,282.778 0.07 -4.11 1,500.00 0.28 95.19 1,499.96 1,429.96 -5.73 2.39 5,929,507.215 719,283.389 0.18 -3.76 1,600.00 0.41 81.98 1,599.96 1,529.96 -5.70 2.99 5,929,507.260 719,283.986 0.15 -3.44 1,700.00 0.34 111.60 1,699.96 1,629.96 -5.76 3.62 5,929,507.219 719,284.617 0.20 -3.18 1,800.00 0.19 41.87 1,799.95 1,729.95 -5.74 4.01 5,929,507.245 719,285.003 0.33 -2.97 1,900.00 0.34 70.74 1,899.95 1,829.95 -5.52 4.40 5,929,507.477 719,285.387 0.20 -2.58 2,000.00- _ __-0.48 44.16 1,999.95 1,929.95 -5.12 4.97 5,929,507.892 719,285.947 0.23 -1.95 3/2/2016 3:44:37PM Page 3 COMPASS 5000.1 Build 61 by BP Final Survey Report BAKER R•■ HUGHES Company: North America -ALASKA - BP Project: Prudhoe Bay Site: PB DS 16 Well: 16-15 Wellbore: 16-15APB1 Design: 16-15APB1 Survey MD (ush) 2,100.00 2,200.00 2,300.00 2,400.00 2,500.00 2,600.00 2,700.00 2,800.00 2,900.00 3,000.00 3,100.00 3,200.00 3,300.00 3,325.00 3,350.00 3,375.00 3,400.00 3,425.00 3,450.00 3,475.00 3,500.00 3,525.00 3,550.00 3,575.00 3,600.00 3,625.00 3,650.00 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 16-15 orkb @ 70.00usft orkb @ 70.00usft True Minimum Curvature EDM R5K-Alaska PROD - ANCP1 Inc Azi (azimuth) TVD TVDSS NIS ENV Northing Easting 1'1 0 (usft) lush) (usfit) (usft) lush) (usft) 0.65 55.61 2,099.95 2,029.95 4.50 5.73 5,929,508.535 719,286.689 040 35.31 2,199.94 2,129.94 -3.90 6.40 5,929,509.159 719,287.341 0.29 40.88 2,299.94 2,229.94 -3.42 6.77 5,929,509.646 719,287.694 0.15 74.70 2,399.94 2,329.94 -3.20 7.06 5,929,509.880 719,287.979 0.22 127.96 2,499.94 2,429.94 -3.28 7.34 5,929,509.805 719,288.259 0.07 231.14 2,599.94 2,529.94 -3.44 7.44 5,929,509.651 719,288.368 0.19 104.55 2,699.94 2,629.94 -3.52 7.55 5,929,509.575 719,288.483 1.41 327.64 2,799.93 2,729.93 -2.52 7.06 5,929,510.557 719,287.956 4.02 310.17 2,899.81 2,829.81 0.78 3.72 5,929,513.760 719,284.524 5.00 315.88 2,999.50 2,929.50 6.17 -1.99 5,929,518.981 719,278.658 5.48 314.41 3,099.08 3,029.08 12.64 -8.44 5,929,525.261 719,272.028 7.30 328.59 3,198.46 3,128.46 21.41 -15.16 5,929,533.826 719,265.054 9.88 316.02 3,297.34 3,227.34 33.01 -24.43 5,929,545.151 719,255.451 10.78 312.78 3,321.93 3,251.93 36.14 -27.64 5,929,548.187 719,252.156 11.32 309.66 3,346.47 3,276.47 39.29 -31.24 5,929,551.236 719,248.461 11.95 308.44 3,370.96 3,300.96 42.47 -35.16 5,929,554.296 719,244.455 12.62 307.67 3,395.39 3,325.39 45.75 -39.35 5,929,557.451 719,240.173 13.13 307.86 3,419.76 3,349.76 49.16 -43.75 5,929,560.734 719,235.672 13.50 307.84 3,444.08 3,374.08 52.69 -48.30 5,929,564.133 719,231.026 13.77 307.93 3,468.38 3,398.38 56.31 -52.95 5,929,567.615 719,226.271 14.11 308.18 3,492.64 3,422.64 60.02 -57.69 5,929,571.188 719,221.424 14.43 308.46 3,516.87 3,446.87 63.84 -62.53 5,929,574.867 719,216.480 14.71 308.80 3,541.07 3,471.07 67.77 -67.44 5,929,578.649 719,211.456 14.97 309.16 3,565.23 3,495.23 71.80 -72.42 5,929,582.530 719,206.364 15.31 309.30 3,589.37 3,519.37 75.93 -77.47 5,929,586.511 719,201.188 15.56 309.64 3,613.46 3,543.46 80.18 -82.61 5,929,590.590 719,195.932 15.89 310.06 3,637.53 3,567.53 84.50 -87.81 5,929,594.778 719,190.607 DLeg V. Sec (*1100usfq (usft) 0.20 -1.03 0.31 -0.18 0.11 0.42 0.19 0.76 0.18 0.83 0.25 074 0.24 0.73 1.55 1.35 2.71 254 1.08 4.35 0.50 6.73 2.40 10.96 3.18 16.37 4.28 17.48 3.21 18.41 2.71 19.20 2.76 19.94 2.05 20.70 1.48 21.48 1.08 22.29 1.38 23.13 1.31 24.03 1.17 24.97 1.10 25.97 1.37 27.02 1.06 28.11 1.40 29.27 3/22016 3 44:37PM Page 4 COMPASS 5000.1 Build 61 by BPFinal •• Survey Report BAKE HUGHES Company: North America-ALASKA-BP Project: Prudhoe Bay Local Co-ordinate Reference: Well 16-15 Site: PB DS 16 TVD Reference: orkb @ 70.00usR Well: 16-15 MD Reference: odcb @ 70.00usfl Wellbore: 16-15APB1 North Reference: True Design: 18-15APB1 Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCPI Survey MD Inc (usft) (°) Azi (azimuth) T/D TVDSS NIS EIW Northing Easting DLeg V. Sec (°I (usft) (usft) (usft) (usft) (usft) (usft) (°/100usfq (usft) 3,675.00 16.28 310.59 3,661.55 3,591.55 88.98 -93.09 5,929,599.105 719,185.199 1.67 3,700.00 16.79 310.94 3,685.52 3,615.52 93.63 -98.48 5,929,603.593 719,179.678 30.51 2.08 31.84 3,725.00 17.41 311.02 3,709.41 3,639.41 98.45 -104.03 5,929,608.250 719,173.991 2.48 3,750.00 17.86 311.32 3,733.24 3,663.24 103.43 -109.73 5,929,613.066 719,168.148 1.84 33.24 3,775.00 18.67 311.59 3,756.98 3,686.98 108.62 -115.60 5,929,618.083 719,162.128 3.26 3471 3,800.00 19.44 311.71 3,780.61 3,710.81 114.04 -121.70 5,929,623.328 719,155.874 3.08 36.27 3,825.00 20.13 311.83 3,804.13 3,734.13 119.68 -128.01 5,929,628.779 719,149.402 37.92 2.76 39.64 3,850.00 20.76 311.98 3,827.56 3,757.56 125.51 -134.51 5,929,634.420 719,142.737 2.53 3,875.00 21.42 312.21 3,850.88 3,780.88 131.55 -141.19 5,929,640.254 719,135.890 2.66 41.44 3,900.00 22.24 312.59 3,874.09 3,804.09 137.81 -148.05 5,929,646.321 719,128.847 3.33 43.33 3,925.00 23.11 312.88 3,897.16 3,827.16 144.35 -155.13 5,929,652.652 719,121.582 3.51 45.33 3,950.00 23.74 313.11 3,920.09 3,850.09 151A3 -162.40 5,929,659.216 719,114.119 47.45 2.55 49.69 3,975.00 24.43 313.32 3,942.92 3,872.92 158.12 -169.83 5,929,665.983 719,106.485 2.78 4,000.00 25.22 313.47 3,965.61 3,895.61 165.33 -177.46 5,929,672.969 719,098.652 3.17 52.02 4,025.00 26.03 313.58 3,988.15 3,918.15 172.78 -185.30 5,929,680,184 719,090.600 3.25 54.45 4,050.00 26.74 313.73 4,010.54 3,940.54 160.44 -193.34 5,929,687.616 719,082.343 2.85 56.98 4,075.00 27.46 313.87 4,032.60 3,962.80 188.33 -201.56 5,929,695.257 719,073.899 59.60 2.89 62.32 4,100.00 28.23 313.99 4,054.90 3,984.90 196.43 -209.97 5,929,703.110 719,065.258 3.09 4,125.00 29.11 314.05 4,076.84 4,006.84 204.76 -218.59 5,929,711.191 719,056.395 3.52 65.13 4,150.00 30.00 314.07 4,098.59 4,028.59 213.34 -227.45 5,929,719.505 719,047.289 3.56 68.03 4,175.00 30.84 314.08 4,120.14 4,050.14 222.14 -236.55 5,929,728.042 719,037.943 3.36 71.03 74.11 4,200.00 31.75 314.16 4,141.51 4,071.51 231.18 -245.87 5,929,736.807 719,028,363 3.64 77.28 4,225.00 32.66 314.22 4,162.66 4,092.66 240.47 -255.42 5,929,745.812 719,018.544 3.64 4,250.00 33.56 314.40 4,183.80 4,113.60 250.01 -265.19 5,929,755,064 719,008.500 3.62 80.54 8392 4,275.00 34.35 314.60 4,204.34 4,134.34 259.80 -275.15 5,929,764.557 718,998.261 3.19 67,42 4,300.00 34.97 314,76 4,224.90 4,154.90 269.80 -285.28 5,929,774.256 718,987,866 2.51 4,325.00 35.46 314.88 4,245.33 4,175.33 279.96 -295.49 5,929,784.116 718,977.350 1.98 91.02 9471 31212016 344:37PM Page 5 COMPASS 5000.1 Build 61 bp BP Far Final Survey Report BAKER HUGHES Company: North Amenca- ALASKA -BP ND Project: Prudhoe Bay Local CooMinate Reference: Site: PB DS 16 ND Reference: Well: 1615 MD Reference: Wellbore: 1615APB1 North Reference: Design: 1615APB1 Survey Calculation Method: 4,265.63 4,195.63 Database: Survey MD (usft) 4,350.00 4,375.00 4,400.00 4,425.00 4,450.00 4,475.00 4,500.00 4,525.00 4,550.00 4,575.00 4,600.00 4,625.00 4,650.00 4,675.00 4,700.00 4,725.00 4,750.00 4,775.00 4,800.00 4,825.00 4,850.00 4,875.00 4,900.00 4,925.00 4,950.00 4,975.00 5,000.00 Well 1615 orkb @ 70.00usft orkb @ 70.00usft True Minimum Curvature EDM RSK - Alaska PROD - ANCP1 Inc Azi (azimuth) ND TVDSS NIS EIW Northing Easting 3.21 106.28 (usft) (usft) lusftl lusft) (usft) (usft) 35.94 315.04 4,265.63 4,195.63 290.27 -305.81 5,929,794.120 718,966.733 36.56 315.18 4,285.79 4,215.79 300.74 -316.24 5,929,804.285 718,956.001 37.36 315.30 4,305.76 4,235.76 311.41 -326.83 5,929,814.646 718,945.112 38.15 315.28 4,325.53 4,255.53 322.29 -337.60 5,929,825.207 718,934.033 39.16 315.25 4,345.05 4,275.05 333.38 -348.59 5,929,835.975 718,922.725 40.55 315.43 4,364.24 4,294.24 344.78 -359.85 5,929,847.039 718,911.139 42.00 315.92 4,383.03 4,313.03 356.58 -371.37 5,929,858.497 718,899.279 43.24 316.08 4,401.43 4,331.43 366.75 -383.13 5,929,870.327 718,887.172 44.32 316.18 4,419.48 4,349.48 381.22 -395.12 5,929,882.443 718,874.828 44.94 316.25 4,437.27 4,367.27 393.90 -407.27 5,929,894.764 718,862.313 45.24 316.28 4,454.92 4,384.92 406.70 419.51 5,929,907.195 718,849.707 45.49 316.27 4,472.48 4,402.48 419.55 -431.81 5,929,919.688 718,837.043 45.73 316.28 4,489.97 4,419.97 432.46 -444.15 5,929,932.234 718,824.326 45.98 316.30 4,507.39 4,437.39 445.43 456.55 5,929,944.835 718,811,559 46.02 316.46 4,524.75 4,454.75 458.45 468.96 5,929,957.488 718,798.780 46.08 316.57 4,542.10 4,472.10 471.51 -481.34 5,929,970.181 718,786.021 46.19 316.63 4,559.43 4,489.43 484.60 493.73 5,929,982.911 718,773.262 46.28 316.70 4,576.72 4,506.72 497.74 -506.12 5,929,995.678 718,760496 46.31 316.73 4,593.99 4,523.99 510,89 -518.51 5,930,008.468 718,747.729 46,46 316.71 4,611.24 4,541.24 524.07 -530.92 5,930,021.278 718,734.944 46.69 316.76 4,628.42 4,558.42 537.29 -543.36 5,930,034.132 718,722.121 46.78 316.83 4,645.56 4,575.56 550.56 -555.82 5,930,047.034 718,709.279 46.83 316.87 4,662.67 4,592.67 563.86 -568.29 5,930,059.962 718,696.434 46.98 316.91 4,679.75 4,609.75 577.18 -580.76 5,930,072.921 718,683.577 47.02 317.02 4,696.80 4,626.80 590.55 -593.24 5,930,085.917 718,670.717 47.16 317.04 4,713.82 4,643.82 603.95 -605.72 5,930,098.946 718,657.853 47.34 317.06 - 4,730.79 4,660.79 617.38 -618.23 5,930,112.014 718,644.980 DLeg V.a" (°I100usft) (usft) 1.96 9847 2.50 102.33 3.21 106.28 3.16 110.31 4.04 114.42 5.58 118.66 5.94 123.12 4.98 127.79 4.33 132.59 2.49 137.50 1.20 142.45 1.00 147.44 0.96 152.45 1.00 157.48 0.49 162.55 0.40 167.67 0.47 172.82 0.41 177.99 0.15 183.19 0.60 188.40 0.93 193.63 0.41 198.89 0.23 204.17 0.61 209.47 0.36 214.81 0.56 220.17 0.72 225.55 31212016 3:44:37PM Page 6 COMPASS 5000.1 Build 61 by BF Final Survey Report BAKER R•• HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Local Co-ordinate Reference: Well 16-15 Site: PB DS 16 TVD Reference: orkb Q 70.00usft Well: 1&15 MD Reference: orkb @ 70.00usft Wellbore: 16-15AP81 North Reference: True Design: 1&15APB1 Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 Survey _ _ MD Inc Ari(azimuth) TVD TVDSS NIS E/W Northing Basting DLeg V. Sec (O8ft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°It00usft) (usft) 5,025.00 47.18 317.18 4,747.76 4,677.76 630.84 -630.73 5,930,125.100 718,632.081 0.73 230.96 5,050.00 46.87 317.40 4,764.80 4,694.80 644.28 -643.13 5,930,138.173 718,619.290 1.40 5,075.00 46.75 317.66 4,781.91 4,711.91 657.72 -655.44 5,930,151.255 718,606.598 236.40 0.90 241.89 5,100.00 46.88 317.89 4,799.02 4,729.02 671.22 -667.69 5,930,164.391 718,593.961 0.85 24745 5,125.00 47.10 317.97 4,816.07 4,746.07 684.79 -679.94 5,930,177.600 718,581.324 0.91 5,150.00 47.36 317.99 4,833.05 4,763.05 698.43 -692.22 5,930,190.870 718,568.649 1.04 253.08 5,175.00 47.43 318.07 4,849.97 4,779.97 712.11 -704.53 5,930,204.188 718,555.952 0.37 258.74 5,200.00 47.46 318.14 4,866.88 4,796.88 725.82 -716.83 5,930,217.532 264.44 718,543.263 0.24 270.16 5,225.00 47.83 318.14 4,883.75 4,813.75 739.55 -729.14 5,930,230.906 718,530.561 0.68 275.90 5,250.00 47.79 318.05 4,900.58 4,830.58 753.32 -741.49 5,930,244.305 718,517.815 0.69 5,275.00 47.95 317.41 4,917.35 4,847.35 767.04 -753.96 5,930,257.656 718,504.951 2.00 281.65 5,300.00 48.11 316.45 4,934.07 4,864.07 780.62 -766.65 5,930,270.859 718,491.870 2.93 287.29 5,325.00 48.36 315.95 4,950.72 4,880.72 794.07 -779.56 5,930,283.937 292.71 718,478.579 1.80 297.91 5,350.00 48.65 315.85 4,967.28 4,897.28 807.52 -792.59 5,930,296.999 718,465.163 1.20 303.04 5,375.00 48.90 315.82 4,983.76 4,913.76 821.01 -805.69 5,930,310.100 718,451.677 1.00 5,400.00 49.02 315.74 5,000.17 4,930.17 834.52 -818.84 5,930,323.226 718,438.140 0.54 308,17 313.30 5,425.00 49.33 315.76 5,016.52 4,946.52 848.07 -832.04 5,930,336.387 718,424.552 1.24 318.43 5,450.00 49.61 315.75 5,032.76 4,962.76 861.69 -845.30 5,930,349.608 718,410.905 1.12 323.59 5,475.00 49.91 315.75 5,048.91 4,978.91 875.36 -858.61 5,930,362.884 718,397.198 1.20 328.77 5,500.00 50.18 315.71 5,064.97 4,994.97 889.08 -871.99 5,930,376.212 718,383.429 1.09 333.97 5,525.00 50.27 315.51 5,080.96 5,010.96 902.81 -885.43 5,930,389.545 718,369.595 0.71 339.14 5,550.00 49.99 314.85 5,096.99 5,026.99 916.42 -898.96 5,930,402.757 718,355.682 2.32 5,575.00 49.60 314.19 5,113.13 5,043.13 929.81 -912.57 5,930,415.743 718,341.886 344.16 2.55 348.95 5,600.00 48.53 313.19 5,129.51 5,059.51 942.85 -926.23 5,930,428.386 718,327.659 5.24 5,625.00 47.52 312.46 5,146.23 5,076.23 955.49 -939.86 5,930,440.619 718,313.668 353.42 5,650.00 46.81 312.14 5,163.22 5,093.22 967.62 -953.42 5,930,452.556 718,299.755 4.59 2.99 357.55 361.45 5,675.00 46.42 312210 5,180.39 5,110.39 980.01 -966.89 5,930,464.346 718,285.932 1.56 385.27 3/2/2016 3:44:37PM Page 7 COMPASS 5000.1 Build 61 by BP ••KE Final Survey Report R HUGHES Company: North Amenca- ALASKA -BP Project: Prudhoe Bay Local Co-ordinate Reference: Well 16-15 Site: PB DS 16 TVD Reference: orkb @ 70.00usR : Well18-15 MO Reference: orkb @ 70.00usft Wellbore: 1fr15APB1 North Reference: True Survey Calculation Method: Minimum Curvature Design: 16-15APB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MO Inc Azi (ulmuth) TVD NDS$ NIS EIW Northing Beating DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usR) (usft) (usft) (°HOOusft) (usft) 5,700.00 46.51 312.07 5,197.61 5,127.61 992.16 -980.34 5,930,476.097 718,272.135 0.37 369.06 5,725.00 46.52 312.18 5,214.62 5,144.82 1,004.32 -993.80 5,930,487.868 718,258.335 0.32 372.67 5,750.00 46.41 312.39 5,232.04 5,162.04 1,016.52 -1,007.20 5,930,499.667 718,244.579 0.75 376.73 5,775.00 46.19 312.67 5,249.31 5,179.31 1,028.74 -1,020.52 5,930,511.492 718,230.911 1.20 5,800.00 46.06 312.90 5,266.64 5,196.64 1,040.98 -1,033.75 5,930,523.343 718,217.336 0.84 380.65 5,825.00 46.17 312.98 5,283.97 5,213.97 1,053.25 -1,046.94 5,930,535.229 718,203.795 384.64 0.50 388.67 5,850.00 46.29 313.01 5,301.26 5,231.26 1,065.56 -1,060.14 5,930,547.151 718,190.239 0.49 5,875.00 46.28 313.06 5,318.54 5,248.54 1,077.89 -1,073.35 5,930,559.093 718,176.680 0.15 392.73 5,900.00 46.43 313.09 5,335.79 5,265.79 1,090.25 -1,086.57 5,930,571.059 718,163.113 0.61 398.81 5,925.00 46.34 313.14 5,353.04 5,283.04 1,102.62 -1,099.78 5,930,583.040 718,149.547 0.39 400.90 5,950.00 46.15 313.21 5,370.33 5,300.33 1,114.98 -1,112.95 5,930,595.007 718,136.026 405.01 0.79 409.12 5,975.00 46.15 313.26 5,387.65 5,317.65 1,127.32 -1,126.08 5,930,606.970 718,122.538 0.14 6,000.00 46.45 313.28 5,404.92 5,334.92 1,139.71 -1,139.24 5,930,618.970 718,109.024 1.20 413.25 6,025.00 46.21 313.42 5,422.18 5,352.18 1,152.13 -1,152.39 5,930,630.996 718,095.520 1.04 417.40 42157 1 6,050.00 46.29 313.53 5,439.47 5,369.47 1,164.55 -1,165.50 5,930,643.035 718,082.060 0.45 425.78 6,075.00 46.36 313.76 5,456.73 5,386.73 1,177.03 -1,178.58 5,930,655.129 718,068.620 0.72 430.05 6,100.00 46.33 314.09 5,473.99 5,403.99 1,189.58 -1,191.61 5,930,667.293 718,055.234 0.96 6,125.00 46.22 314.44 5,491.27 5,421.27 1,202.19 -1,204.55 5,930,679.521 718,041.936 1.10 434.40 6,150.00 46.05 314.78 5,508.60 5,438.60 1,214.85 -1,217.38 5,930,691.801 718,028.743 1.19 438.85 6,175.00 45.97 315.04 5,525.96 5,455.96 1,227.55 -1,230.12 5,930,704.123 718,015.642 0.81 443.40 6,200.00 46.01 315.25 5,543.33 5,473.33 1,240.29 -1,242.80 5,930,716.495 718,002.596 448.03 0.62 452.72 6,225.00 46.01 315.46 5,560.69 5,490.69 1,253.09 -1,25544 5,930,728.919 717,989.590 0.60 6,250.00 45.96 31565 5,578.06 5,508.06 1,265.92 -1,268.03 5,930,741.383 717,976.634 0.58 457.49 462.31 6,275.00 45.87 315.83 5,595.46 5,525.46 1,278.79 -1,280.56 5,930,753.874 717,963.734 0.63 467.18 6,300.00 45.66 315.98 5,612.90 5,542.90 1,291.65 -1,293.03 5,930,766.370 717,950.902 0.94 472.09 6,325.00 45.73 316.05 5,630.36 5,560.36 1,304.52 -1,305.45 5,930,778.876 717,938.109 0.34 477.02 6,350.00 45.80 316.13 5,647.80 5,577.80 1,317.43 -1,317.87 5,930,791.414 717,925.318 - 0.36 481.99 3/2/2016 3.44:37PM Page 8 COMPASS 5000.1 Build 61 by BPFinal HE Fag Survey Report BAKE HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Local Co-ordinate Reference: Well 16-15 Site: PB D516 TVD Reference: orkb (8j 70.00usft Well: 16-15 MD Reference: orkb @ 70.00usft Wellbore: 18-15APB1 North Reference: True Survey Calculation Method: Minimum Curvature Design: 16-15AP81 Database: EDM RSK - Alaska PROD - ANCP1 Survey _ MD Inc AN(uimuN) ND NDSB NIS ENV Northing Easting DLag V. Sac (usft) (1 (') (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) 6,375.00 45.85 316.23 5,665.22 5,595.22 1,330.36 -1,330.29 5,930,803.985 717,912.533 0.35 486.99 6,400.00 46.00 316.33 5,682.61 5,612.61 1,343.34 -1,342.70 5,930,816.599 717,899.749 0.67 492.02 6,425.00 46.32 316.42 5,699.93 5,629.93 1,356.40 -1,355.14 5,930,829.284 717,886.935 1.31 6,450.00 46.66 316.52 5,717.14 5,647.14 1,369.54 -1,367.63 5,930,842.061 497.10 717,874.071 1.39 502.24 6,475.00 47.00 316.68 5,734.24 5,664.24 1,382.79 -1,380.16 5,930,854.939 717,861.165 1.44 6,500.00 47.30 316.76 5,751.24 5,681.24 1,396.13 -1,392.72 5,930,867.911 717,848.218 1.22 507.45 6,525.00 47.63 316.85 5,768.15 5,698.15 1,409.56 -1,405.33 5,930,880.968 717,835.224 512.73 6,550.00 47.95 316.96 5,784.94 5,714.94 1,423.09 -1,417.98 5,930,894.116 717,822.187 1.35 1.32 518.05 6,575.00 48.23 317.12 5,801.64 5,731.64 1,436.70 -1,430.66 5,930,907.358 717,809.118 523.44 1.22 528.89 6,600.00 48.54 317.28 5,818.24 5,748.24 1,450.42 -1,443.36 5,930,920.696 717,796.027 1.33 6,625.00 48.93 317.51 5,834.73 5,764.73 1,464.25 -1,456.08 5,930,934.152 717,782.910 1.71 534.42 6,650.00 49.38 317.61 5,851.08 5,781.08 1,478.20 -1,468.84 5,930,947.732 717,769.749 1.83 540.03 6,675.00 49.73 317.69 5,867.30 5,797.30 1,492.26 -1,481.66 5,930,961.414 717,756.530 1.42 545.74 6,700.00 49.84 317.76 5,883.44 5,813.44 1,506.39 -1,494.50 5,930,975.160 717,743.284 551.51 0.49 557.32 6,725.00 49.76 317.82 5,899.58 5,829.58 1,520.53 -1,507.33 5,930,988.924 717,730.050 0.37 563.15 6,750.00 49.90 317.79 5,915.71 5,845.71 1,534.69 -1,520.16 5,931,002.698 717,716.814 0.57 6,775.00 49.97 317.74 5,931.80 5,861.80 1,548.85 -1,533.02 5,931,016.484 717,703.548 0.32 569.00 6,800.00 49.89 317.70 5,947.89 5,877.89 1,563.01 -1,545.89 5,931,030.258 717,690.273 0.34 574.83 580.66 6,825.00 49.66 317.66 5,964.03 5,894.03 1,577.12 -1,558.74 5,931,043.992 717,677.017 0.93 586.45 6,850.00 49.48 317.61 5,980.25 5,910.25 1,591.18 -1,571.57 5,931,057.673 717,663.792 0.74 592.22 6,875.00 49.42 317.55 5,996.50 5,926.50 1,605.20 -1,584.38 5,931,071.318 717,650.577 0.30 597.96 6,900.00 48.94 317.42 6,012.84 5,942.84 1,619.15 -1,597.17 5,931,084.886 717,637.393 1.96 603.64 6,925.00 48.93 317.37 6,029.27 5,959.27 1,633.02 -1,609.93 5,931,098.382 717,624.236 0.16 609.28 6,950.00 48.78 317.35 6,045.71 5,975.71 1,646.87 -1,622.68 5,931,111.854 717,611.087 0.60 614.89 6,975.00 48.61 317.31 6,062.22 5,992.22 1,660.68 -1,635.41 5,931,125.287 717,597.963 0.69 620.49 7,000.00 48.52 317.26 6,078.76 6,008.76 1,674.45 -1,648.12 5,931,138.682 717,584.855 0.39 626.06 7,025.00 - 48.56 317.22 6,095_31 8,025.31 1,688.21 -1,660.84 5,931,152.062 717,571.742 0.20 631.61 31212016 3:44.37PM Page 9 COMPASS 5000.1 Build 61 by BPFinal Survey Report BAKE Fag HUGHES Company: North America - ALASKA - BP Project: PBay Local Co-ordinate Reference: Well 16-15 Site: PBB IDS DS 1 16 TVD Reference: orkb 70.00usft : Well18-15 MD Reference: orkb (� 70.00usfl Wellbore: 16-15AP North Reference: True Design: 18-i5AP81 Survey Calculation Method: Minimum Curvature Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc (usft) 1°I Azl (azlmuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec 1°I Waft) (usft) Weft) (usft) (usft) (usft) (%100usft) (use) 7,050.00 48.62 317.23 61111.85 6,041.85 1,701.97 -1,673.58 5,931,165.449 717,558.615 0.24 7,075.00 48.59 317.22 6,128.38 6,058.38 1,715.74 -1,686.31 5,931,178.839 717,545.484 637.16 0.12 642]2 1 7,100.00 48.48 31223 6,144.93 6,074.93 1,729.49 -1,699.04 5,931,192.214 717,532.368 0.44 7,125.00 48.41 317.28 6,161.52 6,091.52 1,743.23 -1,711.73 5,931,205.578 717,519.278 648.26 7,150.00 48.38 317.37 6,178.12 6,108.12 1,756.97 -1,724.40 5,931,218.947 717,506.213 0.32 0.29 653.81 7,175.00 48.35 317.45 6,194.73 6,124.73 1,770.73 -1,737.05 5,931,232.329 717,493.175 0.27 659.38 7,200.00 48.23 317.51 6,211.36 6,141.36 1,784.48 -1,749.66 5,931,245.712 664.97 717,480.168 0.51 670.58 7,225.00 48.10 317.59 6,228.04 6,158.04 1,796.23 -1,762.23 5,931,259.085 717,467.203 0.57 7,250.00 47.95 317.64 6,244.76 6,174.76 1,811.95 -1,774.76 5,931,272.443 717,454.281 676.19 7,275.00 47.84 317.69 6,261.52 6,191.52 1,625.66 -1,787.25 5,931,285.784 717,441.397 0.62 681.82 7,300.00 47.74 317.74 6,278.31 6,208.31 1,839.36 -1,799.71 5,931,299.115 717,428.547 0.46 687.44 7,325.00 47.62 317.78 6,295.15 6,225.15 1,853.05 -1,812.14 5,931,312.433 0.43 693.08 717,415.729 0.49 698.72 7,350.00 47.45 317.83 6,312.02 6,242.02 1,866.71 -1,824.53 5,931,325.730 717,402.951 7,375.00 47.38 317.84 6,328.94 6,258.94 1,880.38 -1,836.88 5,931,339.009 717,390.205 0.70 0.28 704.36 7,400.00 47.36 317.79 6,345.87 6,275.87 1,893.98 .1,849.23 5,931,352.273 717,377.463 709.99 7,425.00 47.32 317.79 6,362.81 6,292.81 1,907.60 -1,861.59 5,931,365.525 717,364.721 0.17 715.62 7,450.00 47.22 317.81 6,379.78 6,309.78 1,921.21 -1,873.92 5,931,378.765 0.16 721.24 717,351.997 0.40 726.85 7,475.00 1 47.05 317.79 6,396.78 6,326.78 1,934.78 -1,886.23 5,931,391.975 717,339.300 0.88 7,500.00 46.77 317.76 6,413.86 6,343.86 1,948.30 -1,898.50 5,931,405.132 717,326.643 732.45 7,525.00 46.76 317.78 6,430.99 6,360.99 1,961.79 -1,910.74 5,931,418.257 717,314.016 1.12 738.03 7,550.00 46.69 317.73 6,448.13 6,378.13 1,975.26 -1,922.98 5,931,431.370 717,301.393 0.07 743.59 7,575.00 46.56 317.65 6,465.29 6,395.29 1,988.70 -1,935.21 5,931,444.447 0.32 749.14 717,288.777 0.57 754.66 7,600.00 46.43 317.58 6,482.51 6,412.51 2,002.09 -1,947.43 5,931,457.479 717,276.170 0.56 1 7,625.00 46.34 317.50 6,499.75 6,429.75 2,015.45 -1,959.65 5,931,470.471 717,263.569 760.15 7,650.00 46.17 317.40 6,517.04 6,447.04 2,028.75 -1,971.87 5,931,483415 717,250.975 0.43 765.60 7,675.00 45.99 317.29 6,534.38 6,464.38 2,041.99 -1,984.07 5,931,496.298 717,238.395 0.74 0.79 771.02 7,700.00 45.84 317.18 6,551.77 6,481.77 2,055.18 -1,996.26 5,931,509.122 717,225.824 776.39 0.68 781.71 3/2/2016 3:44:37PM Page 10 COMPASS 5000.1 Bullo 61 by BPFinal Survey Report BAKER•■ HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Local Co-ordinate Reference: Well 76-15 : SitePB DS 16 ND Reference: ork� b 70.00usft Well: 16-15 MD Reference: orkb @ 70.00usft Wellbore: 16-15APB1 North Reference: True Design: i6-15AP81 Survey Calculation Method: Minimum Curvature - Database: EDM RSK- Alaska PROD -ANCP1 Survey_ - MD Inc (usft) Azi (azimuth) ND TI/DSS NIS PJW Northing Easting DLeg V. Sec 1'1 0 lusft) (usft) (ur l (usft) (usft) (usft) ('1100usft) (usft) 7,725.00 45.83 317.06 6,569.19 6,499.19 2,068.32 -2,008.46 5,931,521.903 717,213.245 7,750.00 45.79 316.90 6,586.62 6,516.62 2,081.43 -2,020.69 5,931,534.647 717,200.641 0.35 786.99 7,775.00 45.61 316.71 6,604.08 6,534.08 2,094.47 -2,032.94 5,931,547.329 717,188.021 0.49 792.22 7,800.00 45.48 316.54 6,621.58 6,551.58 2,107.44 -2,045.20 5,931,559.939 717,175.394 0.90 797.39 7,825.00 45.21 316.39 6,639.16 6,569.16 2,120.33 -2,057.45 5,931,572.469 0.71 802.50 717,162.776 1.16 807.54 7,850.00 44.99 316.21 6,656.80 6,586.80 2,133.14 -2,069.68 5,931,584.911 717,150.176 1.02 7,875,00 45.01 316.02 6,674.48 6,604.48 2,145.88 -2,081.93 5,931,597.290 717,137.557 812.51 7,900.00 45.11 315.87 6,692.14 6,622.14 2,156.59 -2,094.24 5,931,609.644 717,124.889 0.54 817.42 7,925.00 45.07 315.76 6,709.79 6,639.79 2,171.29 -2,106.58 5,931,621.977 717,112.186 0.58 822.28 7,950.00 44.84 315.68 6,727.48 6,657.48 2,183.94 -2,118.91 5,931,634.259 0.35 827.10 717,099.492 0.95 831.89 7,975.00 44.78 315.59 6,745.22 6,675.22 2,196.53 -2,131.23 5,931,646.491 717,086.812 0.35 8,000.00 44.72 315.50 6,762.97 6,892.97 2,209.10 -2,143.56 5,931,658.890 717,074.727 8 8,025.00 44.55 315.40 6,780.76 6,710.76 2,221.61 -2,155.88 5,931,670.844 717,061.447 0.35 64141 35.35 8,050.00 44.35 315.31 6,798.61 6,728.61 2,234.07 -2,168.18 5,931,682.937 717,048.789 0.74 846.03 8,075.00 44.21 315.27 6,816.51 6,746.51 2,246.47 -2,180.46 5,931,694,979 0.84 850.67 717,036.155 0.57 855.27 8,100.00 44.18 315.19 6,834.43 6,764.43 2,258.85 -2,192.74 5,931,706.989 717,023.528 8,125.00 44.16 315.15 6,852.36 6,782.36 2,271.20 -2,205.02 5,931,718.981 717,010.894 0.25 859.85 8,150.00 44.01 315.05 6,870.32 6,800.32 2,283.52 -2,217.29 5,931,730.939 716,998.264 0.14 864.41 8,175.00 43.76 315.02 6,888.34 6,818.34 2,295.78 -2,229.54 5,931,742.839 716,985.667 0.66 868.94 8,200.00 43,54 315.04 6,906.43 6,836.43 2,307.99 -2,241.74 5,931,754.688 1,00 87344 716,973,123 0.88 877.91 8,225.00 43.47 315.03 6,924.56 6,854.56 2,320.17 -2,253.90 5,931,766.506 716,960,613 0.28 8,250.00 43.45 314.95 6,942.71 6,872.71 2,332.32 -2,266.06 5,931,778.305 716,948.104 0.23 882,37 8,275.00 43.22 314.93 6,960.89 6,890.89 2,344.44 -2,278.20 5,931,790.065 716,935.813 886.82 8,300.00 42.98 314.90 6,979.14 6,909.14 2,356.50 -2,290.30 5,931,801,769 716,923.172 0.92 891.25 8,325.00 42.84 314.85 6,997.46 6,927.46 2,368.51 -2,302.36 5,931,813.423 0.96 895.64 716,910.767 0.58 900.01 8,350.00 42.68 314.82 7,015.81 6,945.81 2,380.48 -2,314.40 5,931,825.035 716,898,389 0.65 8,375.00 _ -42.44 314.80- 7,034.22 6,964.22 2,392.40 -2,326.40 5,931,836.598 718,888.052 904.36 - - --� - 0.96 908.68 31212016 3:44:37PM - Page 17 COMPASS 5000 1 Build 61 by BP Final Survey Report BAKER HUGHES HUGHES Company: North Amenca- ALASKA -BP Project: Prudhoe Bay Local Co-ordinate Reference: Well 16-15 Site: PB DS 16 TVD Reference: orkb @ 70.O0usft Well: 16-15 MD Reference: orkb @ 70.0Ousft Wellbore: 16-15APB1 North Reference: True Survey Calculation Method: Minimum Curvature Design: 16-15APB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc (usft) AN (azimuth) TVD TVDSS NIS ENV Northing Easting DLsg V. Sec (°) r) (usft) (usft) (usft) (usR) (usft) (usft) (°HOOusft) (usft) 8400.00 42.20 314.74 7,052.71 6,982.71 2,404.25 -2,338.34 5,931,848.099 716,873.764 0.97 912.97 8425.00 41.67 314.73 7,071.28 7,001.26 2,416.03 -2,350.24 5,931,859.530 716,861.536 1.32 8,450.00 41.77 314.76 7,089.91 7,019.91 2,427.77 -2,362.08 5,931,870.916 917.23 716,849.361 0.41 921.47 8,475.00 41.67 314.79 7,108.57 7,038.57 2,439.49 -2,373.89 5,931,882.285 716,837.216 0.41 8,500.00 41.42 314.78 7,127.28 7,057.28 2,451.17 -2,385.65 5,931,893.618 716,825.114 1.00 925.71 8,525.00 41.05 314.68 7,146.08 7,076.08 2,462.76 -2,397.36 5,931,904.870 716,813.076 929.95 8,550.00 40.98 314.60 7,164.94 7,094.94 2,474.29 -2,409.03 5,931,916.053 716,801.073 1.50 934.14 8,575.00 40.94 314.47 7,183.82 7,113.82 2,485.79 -2,420.72 5,931,927.203 0.35 938.28 716,789.063 0.38 942.39 8,600.00 40.75 314.28 7,202.73 7,132.73 2,497.22 -2,432.40 5,931,938.293 716,777.050 0.91 8,625.00 40.45 314.10 7,221.72 7,151.72 2,508.56 -2,444.07 5,931,949.289 716,765.060 1.29 946.45 8,650.00 40.18 313.95 7,240.78 7,170.78 2,519.80 -2,455.70 5,931,960.187 716,753.109 950.44 8,675.00 40.10 313.83 7,259.89 7,189.89 2,530.97 -2,467.31 5,931,971.018 716,741.175 1.15 954.36 8,700.00 40.27 313.80 7,278.99 7,208.99 2,542.14 -2,478.95 5,931,981.843 0.45 958.23 716,729.216 0.68 962.08 8,725.00 40.49 313.83 7,298.03 7,228.03 2,553.36 -2,490.64 5,931,992.712 716,717.209 0.88 8,750.00 40.71 313.89 7,317.02 7,247.02 2,564.83 -2,502.37 5,932,003.639 716,705.157 0.89 965.95 8,775.00 40.96 314.00 7,335.93 7,265.93 2,575.97 -2,514.14 5,932,014.636 716,693.063 969.85 8,800.00 41.27 314.05 7,354.77 7,284.77 2,587.40 -2,525.96 5,932,025.712 716,680.916 1.04 973.79 8,825.00 41.64 314.05 7,373.50 7,303.50 2,598.91 -2,537.86 5,932,036.869 1.25 977.77 716,668.692 1.48 981.79 8,850.00 42.02 314.25 7,392.13 7,322.13 2,610.52 -2,549.82 5,932,048.130 716,656.397 1.61 8,875.00 42.19 314.32 7,410.68 7,340.88 2,622.22 -2,561.82 5,932,059.480 716,644.063 985.87 8,900.00 42.49 314.42 7,429.16 7,359.16 2,634.00 -2,573.86 5,932,070.899 716,631.690 0.71 1.23 990.00 8,925.00 42.91 314.59 7,447.53 7,377.53 2,645.88 -2,585.95 5,932,082.427 716,619.260 1.74 994.18 8,950.00 43.26 314.81 7,465.79 7,395.79 2,657.89 -2,598.09 5,932,094.081 716,606.778 998.43 1.52 1,002.76 8,975.00 43.43 315.05 7,483.97 7,413.97 2,670.01 -2,610.24 5,932,105.841 716,594.284 0.95 1,007.18 9,000.00 43.63 315.27 7,502.10 7,432.10 2,682.22 -2,622.38 5,932,117.692 716,581.794 1.00 9,025.00 43.91 315.31 7,520.15 7,450.15 2,694.51 -2,634.54 5,932,129.624 716,569.276 1.13 1,011.68 9,050.00 44.08 315.30 7,538.13 7,468.13 2,706.86 -2,646.76 5,932,141.608 716,556.710 1,016.25 _ 0.68 1,020.83 31212016 344: 37PM Page 12 COMPASS 50001 Build 61 PA by BPFinal Survey Report BAK R•• HUGHES Company: North Amenca- ALASKA - BP Project: Prudhoe Bay Local Co-ordinate Reference: Well 16-15 Site: PB DS 18 TVD Reference: orkb @ 70.00usft Well: 16-15 MD Reference: orkb @ 70.00usft Wellbore: 16-15APB1 North Reference: True Design: 16-15APB1 Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCPI Survey -- -- MD Inc (usft) (°) AM (azimuth) TVD TVDSS NIS ENV Northing Basting DLeg V. Sec (°) (usft) (usft) (usft) (usft) (usft) (usft) (1100usfy (usft) 9,075.00 44.35 315.38 7,556.05 7,486.05 2,719.26 -2,659.01 5,932,153.646 716,544.101 1.10 1,025.44 9,100.00 44.71 315.49 7,573.87 7,503.87 2,731.75 -2,671.31 5,932,165.774 716,531.442 1.47 1,030.11 9,125.00 1 45.03 315.56 7,591.59 7,521.59 2,744.33 -2,683.67 5,932,177.995 716,518.725 1.30 1,034.83 9,150.00 45.24 315.63 7,609.23 7,539.23 2,756.99 -2,696.07 5,932,190.288 716,505.965 0.86 1,039.59 9,175.00 1 45.37 315.66 7,626.81 7,556.81 2,769.70 -2,708.49 5,932,202.628 716,493.178 0.53 1,044.38 9,200.00 45.72 315.70 7,644.32 7,574.32 2,782.47 -2,720.96 5,932,215.027 716,480.345 1.40 1,049.21 9,225.00 46.11 315.70 7,661.71 7,591.71 2,795.32 -2,733.50 5,932,227.509 716,467.436 1.56 1,054.07 9,250.00 46.42 315.68 7,679.00 7,609.00 2,808.24 -2,746.12 5,932,240.063 716,454.448 1.24 1,058.95 9,275.00 46.63 315.70 7,696.20 7,626.20 2,821.23 -2,758.79 5,932,252.670 716,441.404 0.84 1,063.86 9,300.00 46.79 315.75 7,713.34 7,643.34 2,834.26 -2,771.50 5,932,265.325 716,428.328 0.66 1,068.79 9,325.00 47.19 315.78 7,730.39 7,660.39 2,847.35 -2,784.25 5,932,278.046 716,415.201 1.60 1,073.76 9,350.00 47.52 315.81 7,747.33 7,677.33 2,860.54 -2,797.07 5,932,290.850 716,402.003 1.32 1,076 76 9,375.00 47.69 315.84 7,764.18 7,694.18 2,873.78 -2,809.94 5,932,303.712 716,388.759 0.69 1,083.80 9,400.00 47.77 315.84 7,781.00 7,711.00 2,887.05 -2,822.82 5,932,316.603 716,375.491 0.32 1,088.85 9,425.00 47.87 315.82 7,797.79 7,727.79 2,900.34 .2,835.73 5,932,329.510 716,362.203 0.40 1,093.90 9,450.00 48.10 315.76 7,814.52 7,744.52 2,913.65 -2,848.68 5,932,342.442 716,348.871 0.94 1,098.95 9,475.00 46.22 315.67 7,831.20 7,761.20 2,928.98 -2,861.69 5,932,355.391 716,335.485 0.55 1,104.00 9,500.00 48.26 315.60 7,847.85 7,777.85 2,940.32 -2,874.73 5,932,368.338 716,322.064 0.26 1,109.02 9,525.00 48.30 315.51 7,864.48 7,794.48 2,953.64 -2,887.80 5,932,381.274 716,308.617 0.31 1,114.03 9,550.00 48.41 315.40 7,881.10 7,811.10 2,966.95 -2,900.90 5,932,394.202 716,295.132 0.55 1,119.01 9,575.00 48.61 315.29 7,897.66 7,827.66 2,980.27 -2,914.06 5,932,407.135 716,281.589 0.87 1,123.96 9,600.00 48.72 315.27 7,914.17 7,844.17 2,993.61 -2,927.27 5,932,420.084 716,268.000 0.44 1,128.91 9,625.00 46.32 315.30 7,930.73 7,860.73 3,006.92 -2,940.45 5,932,433.004 716,254.442 1.60 1,133.85 9,650.00 48.07 315.32 7,947.39 7,877.39 3,020.17 -2,953.55 5,932,445.866 716,240.957 1.00 1,138.77 9,675.00 47.96 315.37 7,964.12 7,894.12 3,033.39 -2,966.61 5,932,458.699 716,227.519 0.46 1,143.68 1 9,700.00 47.86 315.41 7,980.87 7,910.87 3,046.60 -2,979.64 5,932,471.522 716,214.112 0.42 1,148.61 9,725.00 47.62 315.40 7,997.69 7,927.69 3,059.77 -2,992.63 5,932,484.314 716,200.745 0.96 1,153_52 J 3/2/2016 3:44:37PM Page 13 COMPASS 5000.1 Build 61 BP FORM LID Final Survey Report BAKER HUGHES Company: North America -ALASKA -BP Local Coordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft Site: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15APB1 Survey Calculation Method: Minimum Curvature Design: 16-15APB1 Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc AN (azimuth) TVD TVDSS NIS ENV Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 9,750.00 47.21 315.37 8,014.60 7,944.60 3,072.88 -3,005.56 5,932,497.036 716,187.443 1.64 1,156.41 9,775.00 47.22 315.30 8,031.58 7,961.58 3,085.92 -3,018.46 5,932,509.705 716,174.173 0.21 1,16326 9,800.00 47.04 315.26 8,048.59 7,978.59 3,098.94 -3,031.35 5,932,522.343 716,160.908 0.73 1,168.09 9,825.00 46.74 315.30 8,065.68 7,995.68 3,111.91 -3,044.19 5,932,534.933 716,147.695 1.21 1,172.90 9,850.00 46.49 315.29 8,082.85 8,012.85 3,124.83 -3,056.98 5,932,547.469 716,134.545 1.00 1,177.69 9,875.00 46.36 315.18 8,100.08 8,030.08 3,137.68 -3,069.73 5,932,559.952 716,121.423 0.61 1,182.45 9,900.00 46.19 315.18 8,117.36 8,047.36 3,150.50 -3,082.46 5,932,572.391 716,108.322 0.68 1,187.18 9,925.00 45.86 315.31 8,134.72 8,064.72 3,163.28 -3,095.13 5,932,584.793 716,095.290 1.37 1,191.91 9,950.00 45.43 315.44 8,152.20 8,082.20 3,176.00 -3,107.69 5,932,597.145 716,082.370 1.76 1,196.65 9,975.00 45.20 315.55 8,169.78 8,099.78 3,186.67 -3,120.15 5,932,609454 716,069.548 0.97 1,201.40 10,000.00 45.14 315.65 8,187.40 8,117.40 3,201.34 -3,132.55 5,932,621.755 716,056.781 0.37 1,206.17 10,025.00 45.05 315.75 8,205.05 8,135.05 3,214.02 -3,144.92 5,932,634.064 716,044.051 0.43 1,210.96 10,050.00 44.77 315.82 8,222.76 8,152.76 3,226.67 -3,157.23 5,932,646.352 716,031.380 1.18 1,215.76 10,075.00 44.59 315.96 8,240.53 8,170.53 3,239.29 -3,169.47 5,932,658.612 716,018.784 0.82 1,220.57 10,100.00 44.43 316.06 8,258.36 8,188.36 3,251.90 -3,181.64 5,932,670.862 716,006.251 0.70 1,225.41 10,125.00 44.20 316.28 8,276.25 8,206.25 3,264.50 -3,193.73 5,932,683.104 715,993.796 1.11 1,230.27 10,150.00 43.83 316.61 8,294.23 8,224.23 3,277.09 -3,205.70 5,932,695.340 715,981.466 1.74 1,235.19 10,175.00 43.34 316.98 8,312.34 8,242.34 3,289.65 -3,217.50 5,932,707.554 715,969.307 2.21 1,240.17 10,200.00 42.95 317.33 8,330.58 8,260.58 3,302.18 -3,229.13 5,932,719.745 715,957.323 1.83 1,245.21 10,225.00 42.72 317.85 8,348.91 8,278.91 3,314.73 -3,240.59 5,932,731.956 715,945.500 1.69 1,250.35 10,250.00 42.36 318.31 8,367.33 8,297.33 3,327.31 -3,251.88 5,932,744.199 715,933.848 1.90 1,255.59 10,275.00 41.95 318.77 8,385.86 8,315.86 3,339.88 -3,262.99 5,932,756.444 715,922.379 2.05 1,260.93 10,300.00 41.65 319.30 8,404.50 8,334.50 3,352.47 -3,273.92 5,932,768.704 715,911.094 1.85 1,266.36 10,325.00 41.48 319.88 8,423.20 8,353.20 3,365.10 -3,284.67 5,932,781.015 715,899.980 1.68 1,271.92 10,350.00 41.12 320.40 8,441.99 8,371.99 3,377.76 -3,295.25 5,932,793.367 715,889.042 1.99 1,277.60 10,375.00 40.68 321.02 8,460.88 8,390.88 3,390.43 -3,305.61 5,932,805.728 715,878.313 2.39 1,283.39 10,400.00 4048 321.35 8,479.87 8,409.87 3,403.10 -3,315.80 5,932,818.098 715,867.756 1.17 1,289.27 3/2/2016 3.44:37PM Page 14 COMPASS 5000.1 Build 61 Em Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 16 Well: 16-15 Wellbore: 16-15APB1 Design: 16-15APBI Survey MD (usft) 10,425.00 10,450.00 10,475.00 10,500.00 10,525.00 10,550.00 10,575.00 10,600.00 10,625.00 10,650.00 10,675.00 10,700.00 10,725.00 10,750.00 10,775.00 10,800.00 TIP 10,820.00 KOP 10,840.01 Interpolated Azimut 10,870.11 Interpolated Azimut 10,900.70 Interpolated Azimu 10,932.01 Interpolated Azimut 10,960.19 3IZ2016 3.44:37PM BP MAP Fag Final Survey Report BAKER HUGHES Local Co-ordinate Reference: Well 16-15 TVD Reference: orkb @ 70.00usft MD Reference: orkb @ 70.00usft Norm Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Inc h h m h Ari(azimuth) TVD NDS$ NIS EIW Northing Easting DLeg V. Sec 1°1 1°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100us1t) (usft) 40.38 321.57 8,498.90 8,428.90 3,415.78 -3,325.91 5,932,830.480 715,857.291 0.70 1,295.20 40.29 321.77 8,517.96 8,447.96 3,428.47 -3,335.94 5,932,842.876 715,846.892 0.63 1,301.18 40.22 321.96 8,537.04 8,467.04 3,441.18 -3,345.92 5,932,855.287 715,836.552 0.57 1,307.19 40.29 322.03 8,556.12 8,486.12 3,453.91 -3,355.86 5,932,867.722 715,826.240 0.33 1,313.24 40.15 322.29 8,575.20 8,505.20 3,466.66 -3,365.77 5,932,880.177 715,815.971 0.87 1,319.33 40.29 322.47 8,594.29 8,524.29 3,479.45 -3,375.62 5,932,892.671 715,805.750 0.73 1,325.48 40.45 322.65 8,613.34 8,543.34 3,492.30 -3,38547 5,932,905.236 715,795.537 0.79 1,331.69 40.48 322.86 8,632.36 8,562.36 3,505.22 -3,395.29 5,932,917.861 715,785.347 0.56 1,337.97 40.36 323.06 8,651.39 8,581.39 3,518.16 -3,405.05 5,932,930.510 715,775.212 0.71 1,344.29 40.21 323.19 8,670.46 8,600.46 3,531.09 -3,414.75 5,932,943.153 715,765.141 0.69 1,350.64 40.42 323.31 8,689.53 8,619.53 3,544.05 -3,424.43 5,932,955.826 715,755.091 0.90 1,357.02 40.38 323.45 8,708.57 8,638.57 3,557.05 -3,434.09 5,932,968.544 715,745.053 0.40 1,363.45 40.35 323.78 8,727.61 8,657.61 3,570.09 -3,443.70 5,932,981.294 715,735.074 0.86 1,369.94 40.36 324.12 8,746.66 8,676.66 3,583.18 -3,453.23 5,932,994.102 715,725.170 0.89 1,376.51 40.36 324.26 8,765.71 8,695.71 3,598.31 -3,462.70 5,933,006.953 715,715.319 0.37 1,383.15 39.94 324.33 8,784.82 8,714.82 3,609.40 -3,472.11 5,933,019.763 715,705.535 1.69 1,389.78 39.56 324.20 8,800.19 8,730.19 3,619.78 -3,479.58 5,933,029.923 715,697.768 1.92 1,395.03 40.83 326.00 8,815.48 8,745.48 3,630.37 -3,486.96 5,933,040.296 715,690.078 8.58 1,400.51 44.12 338.00 8,837.71 8,767.71 3,64828 -3,496.41 5,933,057.920 715,680.117 29.01 1,411.30 52.00 349.00 8,858.18 8,788.18 3,670.06 -3,502.72 5,933,079.502 715,673.179 37.07 1,427.00 56.23 2.20 8,876.58 8,806.58 3,695.25 -3,504.58 5,933,104.634 715,670.587 38.89 1,447.89 59.08 14.12 8,891.69 8,821.69 3,718.75 -3,501.17 5,933,128.214 715,673.311 37.11 1,469.941 Page 15 COMPASS 5000.1 Build 61 by BP Final Survey Report BAKER•• HUGHES Company: North America- ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay Site: PB DS 16 TVD Reference: orkb @ 70.00usft Well. 1615 MD Reference: orkb @ 70.00usft North Reference: True Wellbore: 16-15APBI Survey Calculation Method: Minimum Curvature Design: 16-15AP81 Database: EDM RSK - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) ND TVDSS NIS E/W Northing Beating DLeg V. Sec lusft) 0 (°) (usft) (usft) (usft) (usft) (usft) (ust) (°1100usfq (usft) 10,990.48 62.60 23.14 8,906.47 8,836.47 3,743.76 -3,492.70 5,933,153.459 715,681.051 28.47 1,495.84 11,020.27 70.21 27.87 8,818.39 8,848.39 3,768.36 -3,480.93 5,933,178.387 715,692.102 29.39 1,523.03 11,048.66 79.63 32.98 8,925.78 8,855.78 3,791.94 -3,467.05 5,933,202.368 715,705.295 37.45 1,550.40 11,080.23 83.85 41.99 8,930.32 8,860.32 3,816.69 -3,448.05 5,933,227.659 715,723.566 31.24 11,110.23 84.99 52.51 8,933.25 8,863.25 3,836.93 -3,426.15 5,933,248.522 715,744.864 35.11 1,581.33 1,609.80 11,140.07 87.14 61.87 8,935.30 8,865.30 3,853.04 -3,401.16 5,933,265.349 715,769.377 32.11 1,636.25 11,170.25 88.43 72.39 8,936.47 8,866.47 3,864.74 -3,373.41 5,933,277.852 715,796.772 35.09 1,660.26 11,200.28 92.76 82.08 8,936.15 8,866.15 3,871.37 -3,344.17 5,933,285.324 715,825.810 35.33 1,680.62 11,230.42 93.75 93.05 8,934.44 8,864.44 3,872.65 -3,314.15 5,933,287.473 715,855.776 36.49 1,696.74 11,260.19 94.88 103.91 8,932.19 8,662.19 3,868.28 -3,284.83 5,933,283.958 715,885.206 36.57 1,70761 11,280.40 96.58 110.64 8,930.17 8,860.17 3,862.31 -3,265.64 5,933,278.552 715,904.561 34.18 1,712.04 11,300.40 97.32 113.45 8,927.75 8,857.75 3,854.86 -3,247.24 5,933,271.639 715,923.168 14.43 1,714.79 11,330.20 99.69 110.07 8,923.34 8,853.34 3,843.94 -3,219.88 5,933,261.513 715,950.838 13.75 11,360.50 101.43 106.29 8,917.79 8,847.79 3,834.64 -3,191.59 5,933,253.044 715,979.387 13.54 1,719.01 1,725.10 11,390.31 102.97 102.83 8,911.49 8,841.49 3,827.32 -3,163.39 5,933,246.541 716,007.781 12.47 1,732.86 11,410.28 103.63 100.13 8,906.89 8,836.89 3,823.45 -3,144.35 5,933,243.227 716,026.928 13.57 11,430.28 103.79 97.44 8,902.15 8,832.15 3,820.48 -3,125.15 5,933,240.819 716,046.206 1,739.03 11,460.51 102.69 93.34 8,895.22 8,825.22 3,817.72 -3,095.86 5,933,238.910 716,075.561 13.09 13.69 1,746.06 11,490.68 100,90 87.69 8,889.05 8,819.05 3,817.46 -3,066.34 5,933,239.506 716,105.073 19.27 1,758.31 11,520.63 100.40 83.90 8,883.52 8,813.52 3,819.62 -3,036.99 5,933,242.516 716,134.345 1,772.85 12.55 1,789.39 11,550.56 100.71 79.09 8,878.03 8,808.03 3,823.97 -3,007.90 5,933,247.708 716,163.296 15.83 11,580.43 100.22 74.81 8,872.60 8,802.60 3,830.60 -2,979.29 5,933,255.168 716,191.698 14.19 1,807.70 11,610.32 101.50 69.60 8,866.97 8,796.97 3,839.56 -2,951.35 5,933,264.940 716,219.364 17.65 1,827.751 11,640.51 98.81 65.97 8,861.64 8,791.64 3,850.80 -2,923.85 5,933,276.969 716,246.528 14.81 1,849.48 1,872.96 11,670.34 93.90 63.26 8,858.34 8,788.34 3,863.51 -2,897.08 5,933,290.448 716,272.918 18.77 1,897.36 11,700.53 91.41 58.14 8,856.94 8,786.94 3,878.26 -2,870.79 5,933,305.958 716,298.765 18.84 1,923.28 11,730.32 90.06 52.41 8,856.56 8,786.56 3,895.22 -2,846.32 5,933,323.622 718,322.733 19.78 1,950.20 3/2/2016 3:44:37PM Page 16 COMPASS 5000.1 Build 61 by BP Final Survey Report BAK R•• HUGHES Company: North America - ALASKA - BP Azl (azimuth) (°) 46.88 42.55 38.55 TVD (usft) 8,856.42 8,856.01 8,855.12 Project: Prudhoe Bay Local Coordinate Reference: Well 16-15 Site: PB DS 16 TVD Reference: orkb Q 70.00usft Well: 16-15 MD Reference: orkb @ 70.00usft Wellbore: 16-ISAPSI North Reference: True 17.39 19.00 18.63 19.74 26.56 2,047.44 2,077.67 2,107.56 2,137.05 2,165.61 Survey Calculation Method: Minimum Curvature Design: 16-15APB1 8,780.78 8,779.30 8,777.84 8,776.46 8,776.45 4,107.97 4,138.07 4,167.79 4,197.47 4,225.96 -2,728.43 -2,728.24 -2,731.10 -2,736.58 -2,745.12 5,933,539.695 5,933,569.789 5,933,599.411 5,933,628.912 5,933,657.148 Database: EDM R5K - Alaska PROD - ANCPI Survey 12,130.46 12,160.66 12,191.10 12,221.33 12,250.72 89.20 88.53 90.09 92.03 91.75 333.92 327.72 324.15 329.49 335.78 MD (usft) 11,760.42 11,780.60 11,800.47 Inc (°) 90.49 91.81 93.32 Azl (azimuth) (°) 46.88 42.55 38.55 TVD (usft) 8,856.42 8,856.01 8,855.12 TVDSS (usft) 8,786.42 8,786.01 8,785.12 NIS (usft) 3,914.70 3,929.04 3,944.12 ENV (usft) -2,823.39 -2,809.20 -2,796.30 Northing (usft) 5,933,343.761 5,933,358.500 5,933,373.947 Beading (usft) 716,345.085 716,358.854 716,371.312 DLeg (°ItOOustt) 18.43 22.43 21.50 V. Sec Waft) 1,978.54 1,998.05 2,017.56 11,830.60 11,860.88 11,890.84 11,920.74 11,950.52 94.49 90.65 90.31 89.69 89.69 33.43 29.14 23.57 17.70 9.79 8,853.07 8,851.71 8,851.46 8,851.46 8,851.62 8,783.07 8,781.71 8,781.46 8,781.46 8,781.62 3,968.43 3,994.27 4,021.10 4,049.07 4,077.98 -2,778.64 -2,762.94 -2,749.64 -2,739.11 -2,732.04 5,933,398.761 5,933,425.046 5,933,452.254 5,933,480.516 5,933,509.612 716,388.257 716,403.200 716,415.709 716,425.424 716,431.651 17.39 19.00 18.63 19.74 26.56 2,047.44 2,077.67 2,107.56 2,137.05 2,165.61 11,980.76 12,010.92 12,040.82 12,071.04 12,100.81 93.50 92.09 93.53 91.69 88.37 3.95 356.76 352.24 346.83 339.83 8,850.78 8,849.30 8,847.84 8,846.46 8,846.45 8,780.78 8,779.30 8,777.84 8,776.46 8,776.45 4,107.97 4,138.07 4,167.79 4,197.47 4,225.96 -2,728.43 -2,728.24 -2,731.10 -2,736.58 -2,745.12 5,933,539.695 5,933,569.789 5,933,599.411 5,933,628.912 5,933,657.148 716,434.394 716,433.705 716,429.983 716,423.642 716,414.285 23.05 24.27 15.85 18.89 26.02 2,193.39 2,21956 2,243.86 2,266.82 2,287.23 12,130.46 12,160.66 12,191.10 12,221.33 12,250.72 89.20 88.53 90.09 92.03 91.75 333.92 327.72 324.15 329.49 335.78 8,847.07 8,847.67 8,848.04 8,847.48 8,846.51 8,777.07 8,777.67 8,778.04 8,777.48 8,776.51 4,253.21 4,279.56 4,304.77 4,330.06 4,356.13 -2,756.75 -2,771.47 -2,788.51 -2,805.05 -2,818.54 5,933,684.046 5,933,709.956 5,933,734.659 5,933,759.453 5,933,785.123 716,401.862 716,386.390 716,368.620 716,351.358 716,337.112 20.12 20.65 12.80 18.79 21.41 2,305.01 2,320.48 2,333.78 2,347.42 2,363.25 12,281.00 12,310.76 12,340.72 12,370.87 12,400.90 89.88 89.66 90.89 90.55 89.60 341.55 342.70 337.52 332.21 328.10 8,846.08 8,846.20 8,846.05 8,845.68 8,845.64 8,776.08 8,776.20 8,776.05 8,775.68 8,775.64 4,384.32 4,412.64 4,440.81 4,468.09 4,494.13 -2,829.55 -2,838.69 -2,648.88 -2,861.68 -2,876.62 5,933,812.979 5,933,841.023 5,933,868.877 5,933,895.775 5,933,921.371 716,325.289 716,315.337 716,304.335 716,290.748 716,275.057 20.03 3.93 17.77 17.65 14.05 2,382.16 2,402.12 2,421.41 2,438.64 2,453.72 12,430.82 12,460.82 12,490.14 12,520.45 83.66 78.59 71.30 64.41 330.54 333.18 335.40 _ 337.70 8,847.39 8,852.02 8,859.63 8,871.05 8,777.39 8,782.02 8,789.63 8,801.05 4,519.80 4,545.93 4,571.41 4,597.15 -2,891.85 -2,905.83 -2,918.11 -2,929.29 5,933,946.589 5,933,972.295 5,933,997.414 5,934,022.810 716,259.065 716,244.355 716,231.339 716,219.420 21.46 19.00 25.91 23.79 2,468.34 2,483.97 2,499.91 2,516.60 3/2/2016 3:44:37PM Page 17 COMPASS 5000.1 Build 61 by BP Final Survey Report BAKER•• HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Local Co-ordinate Reference: Site: PB DS 16 Casing Hole Well: 16-15 Depth TVD Reference: Wellbore: 16-15APB1 orkb @ 70.00usft Diameter Design: 16.15APB1 (usft) (usft) Survey Name orkb @ 70.00usft MD Inc (in) ANJazimuth) (usft) North Reference: 12,550.81 58.02 339.59 12,575.89 52.74 340.68 12,600.50 47.50 340.68 12,630.56 41.31 335.88 12,660.53 35.72 329.18 12,710.00 35.72 329.18 Projection to TD Easting DLeg Casing Points (usft) (usft) V. Sec (usft) 2,533.09 2,546.49 2,558.79 2,571.85 2,581.92 2,596.01 Measured Vertical Local Co-ordinate Reference: Well 16-15 Casing Hole Depth Depth TVD Reference: orkb @ 70.00usft Diameter Diameter (usft) (usft) MD Reference. Name orkb @ 70.00usft (in) (in) 10,78900 8,776.40 North Reference: True 9.625 12.250 2,505.00 2,504.94 Survey Calculation Method: Minimum Curvature 13.375 17.500 Design Annotations Database: �— EDM R5K-Alaska PROD -ANCP1 TVD TVDSS NIS EIW Northing Easting DLeg (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) 8,885.57 8,815.57 4,621.75 -2,938.92 5,934,047.118 716,209.078 21.89 8,899.93 8,829.93 4,641.30 -2,945.99 5,934,066.460 716,201.441 21.18 8,915.70 8,845.70 4,659.12 -2,952.24 5,934,084.086 716,194.680 21.29 8,937.17 8,867.17 4,678.66 -2,959.97 5,934,103.390 716,186.386 23.42 8,960.62 8,890.62 4,695.22 -2,968.51 5,934,119.696 716,177.374 23.25 9,000.79 8,930.79 4,720.02 -2,983.30 5,934,144.058 716,161.863 0.00 V. Sec (usft) 2,533.09 2,546.49 2,558.79 2,571.85 2,581.92 2,596.01 Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 10,78900 8,776.40 9518" 9.625 12.250 2,505.00 2,504.94 133/8" 13.375 17.500 Design Annotations — �— -� - — - -- -- -- Measured Vertical Local Coordinates Depth Depth -NI-S +EI -W (usft) (usft) (usft) (usft) Comment 10,800.00 8,784.82 3,609.40 -3,472.11 TIP 10,820.00 8,800.19 3,619.78 -3,479.58 KOP 10,840.01 8,815.48 3,630.37 -3,486.96 Interpolated Azimuth 10,870.11 8,837.71 3,648.28 -3,496.41 Interpolated Azimuth 10,900.70 8,858.18 3,670.06 -3,502.72 Interpolated Azimuth 10,932.01 8,876.58 3,695.25 -3,504.58 Interpolated Azimuth 12,710.00 9,000.79 4,720.02 -2,983.30 Projection to TO Approved By: Yosha Ragbirsingh Survey Manager Baker Hughes 3/2/2016 3:44:37PM Page 18 COMPASS 5000.1 Build 61 �v `a Yt r$ ryes*$.,' North America - ALASKA - BP Prudhoe Bay PB DS 16 16-15 16-15A 500292147401 Design: 16-15A Final Survey Report 02 March, 2016 we W-- BAKER HUGHES by 0 BP Final Survey Report BAKER•■ HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb Q 70.00usft Site: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True ' Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM R5K - Alaska PROD - ANCP1 Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 16, TR -10-15 Site Position: Northing: 5,927,441.990 usft Latitude: 70° 12' 15.545 N From: Map Easting: 718,969.880 usft Longitude: 148. 14'4,567 W Position uncertainty: 0.00 usft _ _ Slot Radius: 0.000 in Grid Convergence: 1.66 Well 16-15,16-15 -- — - _ Well Position -NI-S 0.00 usft Northing: 5,929,512.870 usft Latitude: 70° 12'35.816 N +E/ -W 0.00 usft Easting: 719,280.830 usft Longitude: 148° 13'53.802 W Position uncertainty 0.00 usft _ Wellhead Elevation: 39.96 usft Ground Level: a 36.69 usft Wellbore 16-15A — _ _ - ---- Magnetics Model Name Sample Date Declination Dip Angle Field Strength (1) 0(nn BGGM2015 2/1/2016 19.38 81.03 57,552 _ Design _ -- 16-15A Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 11,640.51 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (I 30.04 0.00 0.00 327.98 31212016 3:37:59PM Page 2 COMPASS 5000.1 Build 61 by BP Final Survey Report BAK R•■ HUGHES Company: North America - ALASKA - BP Inc Project: Prudhoe Bay TVD Site: PB DS 16 NIS Well: 16-15 Northing Wellbore: 16-15A (usft) Design: 16 -ISA (°) )usft) (usft) Survey Program Data 3/2/16 20 (usft) From To (usft) (usft) (usft) Survey (Wellbore) Tool Name 100.00 10,800.00 GymData Gyro (16-15) GYD-CT-CMS 10,820.00 11,640.51 CTK MWD 4-1/4"(16-15APB1) MWD 11,650.00 12,550.22 CTK MWD 4-114"(16-15A) MWD Surrey 100.00 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Description Gyrodata cont casing m/s MWD - Standard MWD - Standard Well 16-15 orkb @ 70.00usft orkb Q 70.00usft True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 MD Inc Azi (azimuth) TVD TVDSS NIS ENV Northing Easting (usft) r) (°) )usft) (usft) (usft) (usft) (usft) (usft) 30.04 0.00 0.00 30.04 -39.96 0.00 0.00 5,929,512.870 719,280.830 100.00 0.21 282.32 100.00 30.00 0.03 -0.13 5,929,512.894 719,280.704 200.00 0.38 258.69 200.00 130.00 0.00 -0.63 5,929,512.853 719,280.201 300.00 0.32 247.60 300.00 230.00 -0.17 -1.21 5,929,512.665 719,279.623 400.00 0.55 227.06 399.99 329.99 -0.60 -1.82 5,929,512.214 719,279.026 500.00 0.47 216.10 499.99 429.99 -1.26 -2.42 5,929,511.539 719,278.452 600.00 0.49 165.33 599.99 529.99 -2.01 -2.55 5,929,510.790 719,278.341 700.00 0.52 148.46 699.98 629.98 -2.81 -2.20 5,929,510.000 719,278.709 800.00 0.37 155.20 799.96 729.98 -3.49 -1.83 5,929,509.331 719,279.102 900.00 0.53 144.01 899.98 829.98 4.15 -1.42 5,929,508.676 719,279.528 1,000.00 0.52 137.07 999.97 929.97 -4.86 -0.84 5,929,507.987 719,280.129 1,100.00 0.38 145.44 1,099.97 1,029.97 -5.47 -0.35 5,929,507.396 719,280.644 1,200.00 0.43 102.25 1,199.97 1,129.97 -5.82 0.21 5,929,507.060 719,281.209 1,300.00 0.48 85.93 1,299.96 1,229.96 -5.87 0.99 5,929,507.033 719,281.994 1,400.00 0.43 79.70 1,399.96 1,329.96 -5.77 1.78 5,929,507.152 719,282.778 1,500.00 0.28 95.19 1,499.96 1,429.96 -5.73 2.39 5,929,507215 719,283.389 1,600.00 0.41 81.98 1,599.96 1,529.96 -5.70 2.99 5,929,507260 719,283.986 1,700.00 0.34 111.60 1,699.96 1,629.96 -5.76 3.62 5,929,507.219 719,284.617 1,800.00 0.19 41.87 1,799.95 1,729.95 -5.74 4.01 5,929,507.245 719,285.003 1,900.00 0.34 70.74 1,899.95 1,629.95 -5.52 4.40 5,929,507.477 719,285.387 DLe9 (°1100usft) 0.00 0.30 0.21 0.09 0.27 0.13 0.41 0.15 0.16 0.18 0.06 0.15 0.30 0.14 0.07 0.18 0.15 0.20 0.33 0.20 V. Sec (usft) 0.00 0.09 0.33 0.50 0.45 0.21 -0.35 -1.21 -1.99 -2.77 -3.67 -4.45 -5.04 -5.50 -5.84 -6.12 -6.42 -6.80 -7.00 -7.02 3/272016 3:37:59PM Page 3 COMPASS 5000.1 Build 61 Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 16 Well: 16-15 Wellbore: 16-15A Design: 16-15A Survey MD (usft) 2,000.00 2,100.00 2,200.00 2,300.00 2,400.00 2,500.00 2,600.00 2,700.00 2,800.00 2,900.00 3,000.00 3,100.00 3,200.00 3,300.00 3,325.00 3,350.00 3,375.00 3,400.00 3,425.00 3,450.00 3,475.00 3,500.00 3,525.00 3,550.00 3,575.00 3,600.00 3,625.00 3/712016 3:37'59PM BP war FA Final Survey Report BAKER HUGHES Local Cc -ordinate Reference: Well 16-15 TVD Reference: orkb @ 70.00usft MD Reference: orkb @ 70.00usft North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 Inc Azi (azimuth) TVD TVDSS NIS ENV Northing Easting 1°1 1°1 lusty (usR) (usR) (usR) (usR) (usR 0.48 44.16 1,999.95 1,929.95 -5.12 4.97 5,929,507.892 719,285.947 0.65 55.61 2,099.95 2,029.95 -4.50 5.73 5,929,508.535 719,286.689 0.40 35.31 2,199.94 2,129.94 -3.90 6.40 5,929,509.159 719,287.341 0.29 40.88 2,299.94 2,229.94 -3.42 6.77 5,929,509.646 719,287.694 0.15 74.70 2,399.94 2,329.94 -3.20 7.06 5,929,509.880 719,287.979 0.22 127.96 2,499.94 2,429.94 -3.28 7.34 5,929,509.805 719,288.259 0.07 231.14 2,599.94 2,529.94 -3.44 7.44 5,929,509.651 719,288.368 0.19 104.55 2,699.94 2,629.94 -3.52 7.55 5,929,509.575 719,288.483 1.41 327.64 2,799.93 2,729.93 -2.52 7.06 5,929,510.557 719,287.956 4.02 310.17 2,899.81 2,829.81 0.78 3.72 5,929,513.760 719,284.524 5.00 315.88 2,999.50 2,929.50 6.17 -1.99 5,929,518.981 719,278.658 5.48 314.41 3,099.08 3,029.08 12.64 -8.44 5,929,525.261 719,272.028 7.30 328.59 3,198.46 3,128.46 21.41 -15.16 5,929,533.826 719,265.054 9.88 316.02 3,297.34 3,227.34 33.01 -24.43 5,929,545.151 719,255.451 10.78 312.78 3,321.93 3,251.93 36.14 -27.64 5,929,548.187 719,252.156 11.32 309.68 3,346.47 3,276.47 39.29 -31.24 5,929,551.236 719,248.461 11.95 308.44 3,370.96 3,300.96 42.47 -35.16 5,929,554.296 719,244.455 12.62 307.67 3,395.39 3,325.39 45.75 -39.35 5,929,557.451 719,240.173 13.13 307.86 3,419.76 3,349.76 49.16 -43.75 5,929,560.734 719,235.672 13.50 307.84 3,444.08 3,374.08 52.69 -48.30 5,929,564.133 719,231.026 13.77 307.93 3,468.38 3,398.38 56.31 -52.95 5,929,567.615 719,226.271 14.11 308.18 3,492.64 3,422.64 60.02 -57.69 5,929,571.188 719,221.424 14.43 308.46 3,516.87 3,446.87 63.84 -62.53 5,929,574.867 719,216.480 14.71 308.80 3,541.07 3,471.07 67.77 -67.44 5,929,578.849 719,211.456 14.97 309.16 3,565.23 3,495.23 71.80 -72.42 5,929,582.530 719,206.364 15.31 309.30 3,589.37 3,519.37 75.93 -77.47 5,929,586.511 719,201.188 15.56 309.64 3,613.46 3,543.46 80.16 -82.61 5,929,590.590 719,195.932 Page 4 DLeg V.Sec (°I100ueft) (usR) 0.23 -6.98 0.20 -6.86 0.31 -6.70 0.11 -649 0.19 -645 0.18 -6.67 0.25 -6.86 0.24 -6.99 1.55 -5.88 2.71 -1.31 1.08 6.29 0.50 15.19 2.40 26.19 3.18 40.94 4.28 45.29 3.21 49.88 2.71 54.65 2.76 5965 2.05 64.88 1.48 70.28 1.08 75.82 1.38 81.48 1.31 87.28 1.17 93.22 1.10 99.27 1.37 105.45 1.06 111.76 COMPASS 5000.1 Build 81 BID IG1i by Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay ND Reference: orkb @ 70.00usft Site: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM R5K - Alaska PROD - Al Survey MD Inc ANjazlmuth) TVD TVDSS NIS EIW Northing Basting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) --- 3,650.00 15.89 310.06 3,637.53 3,567.53 84.50 -87.81 5,929,594.778 719,190.607 1.40 118.20 3,675.00 16.28 310.59 3,661.55 3,591.55 88.98 -93.09 5,929,599.105 719,185.199 1.67 124.80 3,700.00 16.79 310.94 3,685.52 3,615.52 93.63 -98.48 5,929,603.593 719,179.678 2.08 131.60 3,725.00 17.41 311.02 3,709.41 3,639.41 98.45 -104.03 5,929,608.250 719,173.991 2.48 138.63 3,750.00 17.86 311.32 3,733.24 3,663.24 103.43 -109.73 5,929,613.068 719,168.148 1.84 145.88 3,775.00 18.67 311.59 3,756.98 3,686.98 108.62 -115.60 5,929,618.083 719,162.128 3.26 153.39 3,800.00 1944 311.71 3,780.61 3,710.61 114.04 -121.70 5,929,623.328 719,155.874 3.08 161.22 3,825.00 20.13 311.83 3,804.13 3,734.13 119.68 -128.01 5,929,628.779 719,149.402 2.76 169.35 3,850.00 2036 311.98 3,827.56 3,757.56 125.51 -134.51 5,929,634.420 719,142.737 2.53 177.74 3,875.00 21.42 312.21 3,850.88 3,780.88 131.55 -141.19 5,929,640.254 719,135.890 2.66 186.39 3,900.00 22.24 312.59 3,874.09 3,804.09 137.81 -148.05 5,929,646.321 719,128.847 3.33 195.35 3,925.00 23.11 312.88 3,897.16 3,827.16 144.35 -155.13 5,929,652.652 719,121.582 3.51 204.65 3,950.00 23.74 313.11 3,920.09 3,850.09 151.13 -162.40 5,929,659.216 719,114.119 2.55 214.25 3,975.00 24.43 313.32 3,942.92 3,872.92 158.12 -169.83 5,929,665.983 719,106.485 2.78 224.11 4,000.00 25.22 313.47 3,965.61 3,895.61 165.33 -177.46 5,929,672.969 719,098.652 3.17 234.27 4,025.00 26.03 313.58 3,988.15 3,918.15 172.78 -185.30 5,929,680.184 719,090.600 3.25 244.74 4,050.00 26.74 313.73 4,010.54 3,940.54 180.44 -193.34 5,929,687.616 719,082.343 2.85 255.50 4,075.00 27.46 313.87 4,032.80 3,962.80 188.33 -201.56 5,929,695.257 719,073.899 2.89 266.55 4,100.00 28.23 313.99 4,054.90 3,984.90 196.43 -209.97 5,929,703.110 719,065.258 3.09 277.87 4,125.00 29.11 314.05 4,076.84 4,006.84 204.76 -218.59 5,929,711.191 719,056.395 3.52 289.51 4,150.00 30.00 314.07 4,098.59 4,028.59 213.34 -227.45 5,929,719.505 719,047.289 3.56 301.48 4,175.00 30.84 314.06 4,120.14 4,050.14 222.14 -236.55 5,929,728.042 719,037.943 3.36 313.77 4,200.00 31.75 314.16 4,141.51 4,071.51 231.18 -245.87 5,929,736.807 719,028.363 3.64 326.38 l 4,225.00 32.66 314.22 4,182.88 4,092.66 240.47 -255.42 5,929,745.812 719,018.544 3.64 339.32 4,250.00 33.56 314.40 4,183.60 4,113.60 250.01 -265.19 5,929,755.064 719,008.500 3.62 352.59 4,275.00 34.35 314.60 4,204.34 4,134.34 259.80 -275.15 5,929,764.557 718,998.261 3.19 366.17' 4,300.00 34.97 314.76 4,224.90 4,154.90 269.80 -285.26 5,929,774.256 718,987.866 2.51 380.00 3/2/2016 3:3759PM Page 5 COMPASS 5000.1 Build 61 b BP W��'d p Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ortllnale Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft Site: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc AN (azimuth) TVD TVDSS NISS E/W Northing Easting DLeg V. Seo (usft) (°) V) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usf) (usft) 4,325.00 35.46 314.88 4,245.33 4,175.33 279.96 -295.49 5,929,784.116 718,977.350 1.98 394.04 4,350.00 35.94 315.04 4,265.63 4,195.63 290.27 -305.81 5,929,794.120 718,966.733 1.96 408.25 4,375.00 36.56 315.18 4,285,79 4,215.79 300.74 -316.24 5,929,804.285 718,956.001 2.50 422.66 4,400.00 37.36 315.30 4,305.76 4,235.76 311.41 -326.83 5,929,814.646 718,945.112 3.21 437.331 4,425.00 38.15 315.28 4,325.53 4,255.53 322.29 -337.60 5,929,825.207 718,934.033 3.16 452.26 4,450.00 39.16 315.25 4,345.05 4,275.05 333.38 -348.59 5,929,835.975 718,922.725 4.04 467.49 4,475.00 40.55 315.43 4,364.24 4,294.24 344.78 -359.85 5,929,847.039 718,911.139 5.58 483.12 4,500.00 42.00 315.92 4,383.03 4,313.03 356.58 -371.37 5,929,858.497 718,899.279 5.94 499.24 4,525.00 43.24 316.08 4,401.43 4,331.43 368.75 -383.13 5,929,870.327 718,887.172 4.98 515.80 4,550.00 44.32 316.18 4,419.48 4,349.48 381.22 -395.12 5,929,882.443 718,874.828 4.33 532.73 4,575.00 44.94 316.25 4,437.27 4,367.27 393.90 -407.27 5,929,894.764 718,862.313 2.49 549.92 4,600.00 45.24 316.28 4,454.92 4,384.92 406.70 -419.51 5,929,907.195 718,849.707 1.20 567.26 4,625.00 45.49 316.27 4,472.48 4,402.48 419.55 -431.81 5,929,919.688 718,837.043 1.00 584.68 4,650.00 45.73 316.28 4,489.97 4,419.97 432.46 -444.15 5,929,932.234 718,824.326 0.96 602.17 4,675.00 45.98 316.30 4,507.39 4,437.39 445.43 -456.55 5,929,944.835 718,811.559 1.00 619.74 4,700.00 46.02 316.46 4,524.75 4,454.75 458.45 468.96 5,929,957.488 718,798.780 0.49 637.35 4,725.00 46.08 316.57 4,542.10 4,472.10 471.51 481.34 5,929,970.181 718,786.021 0.40 654.99 4,750.00 46.19 316.63 4,559.43 4,489.43 484.60 493.73 5,929,982.911 718,773.262 0.47 672.66 4,775.00 46.28 316.70 4,576.72 4,506.72 497.74 -506.12 5,929,995.678 718,760.496 0.41 690.37 4,800.00 46.31 316.73 4,593.99 4,523.99 510.89 -518.51 5,930,008.468 718,747.729 0.15 708.09 4,825.00 46.46 316.71 4,611.24 4,541.24 524.07 -530.92 5,930,021.278 718,734.944 0.60 725.84 4,850.00 46.69 316.76 4,628.42 4,556.42 537.29 -543.36 5,930,034.132 718,722.121 0.93 743.65 4,875.00 46.78 316.83 4,645.56 4,575.56 550.56 -555.82 5,930,047.034 718,709.279 0.41 761.51 4,900.00 46.83 316.87 4,662.67 4,592.67 563.86 -568.29 5,930,059.962 718,696.434 0.23 779.39 4,925.00 46.98 316.91 4,679.75 4,609.75 577.18 -580.76 5,930,072.921 718,683.577 0.61 797.31 4,950.00 47.02 317.02 4,696.80 4,626.80 590.55 -593.24 5,930,085.917 718,670.717 0.36 815.25 4,975.00 47.16 317.04 4,713.82 4,643.82 603.95 -605.72 5,930,098.946 718,657.853 0.56 833.23 3/2/2076 3:37.59PM Page COMPASS 5000.7 Build 61 by BP MAP R�w Final Survey Report HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft Site: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec lust( (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) 5,000.00 47.34 317.06 4,730.79 4,660.79 617.38 -618.23 5,930,112.014 718,644.960 0.72 851.261 5,025.00 47.18 317.18 4,747.76 4,677.76 630.84 -630.73 5,930,125.100 718,632.081 0.73 869.29 5,050.00 46.87 317.40 4,764.80 4,694.80 644.28 -643.13 5,930,138.173 718,619.290 1.40 887.26 5,075.00 46.75 317.66 4,781.91 4,711.91 657.72 -655.44 5,930,151.255 718,606.598 0.90 905.19 5,100.00 46.88 317.89 4,799.02 4,729.02 671.22 -667.69 5,930,164.391 718,593.961 0.85 923.13 5,125.00 47.10 317.97 4,816.07 4,746.07 684.79 -679.94 5,930,177.800 718,581.324 0.91 941.13 5,150.00 47.36 317.99 4,833.05 4,763.05 698.43 -692.22 5,930,190.870 718,568.649 1.04 959.20 5,175.00 47.43 318.07 4,849.97 4,779.97 712.11 -704.53 5,930,204.188 718,555.952 0.37 977.33 5,200.00 47.46 318.14 4,866.88 4,796.88 725.82 -716.63 5,930,217.532 718,543.263 0.24 995.47 5,225.00 47.63 318.14 4,883.75 4,813.75 739.55 -729.14 5,930,230.906 718,530.561 0.68 1,013.64 5,250.00 47.79 318.05 4,900.58 4,830.58 753.32 -741.49 5,930,244.305 718,517.815 0.69 1,031.86 5,275.00 47.95 317.41 4,917.35 4,847.35 767.04 -753.96 5,930,257.656 718,504.951 2.00 1,050.11 5,300.00 48.11 316.45 4,934.07 4,864.07 780.62 -766.65 5,930,270.859 718,491.870 2.93 1,068.35 5,325.00 48.36 315.95 4,950.72 4,880.72 794.07 -779.56 5,930,263.937 718,478.579 1.80 1,086.60 5,350.00 48.65 315.85 4,967.28 4,897.28 807.52 -792.59 5,930,296.999 718,465.163 1.20 1,104.91 5,375.00 48.90 315.82 4,983.76 4,913.76 821.01 -805.69 5,930,310.100 718,451.877 1.00 1,123.30 5,400.00 49.02 315.74 5,000.17 4,930.17 834.52 -818.84 5,930,323.226 718,438.140 0.54 1,141.73 5,425.00 49.33 315.76 5,016.52 4,946.52 848.07 -832.04 5,930,336.387 718,424.552 1.24 1,160.22 5,450.00 49.61 315.75 5,032.76 4,962.76 861.69 -845.30 5,930,349.608 718,410.905 1.12 1,178.79 5,475.00 49.91 315.75 5,048.91 4,978.91 875.36 -858.61 5,930,362.884 718,397.198 1.20 1,197.44 5,500.00 50.18 315.71 5,064.97 4,994.97 889.08 -871.99 5,930,376.212 718,383.429 1.09 1,216.16 5,525.00 50.27 315.51 5,080.96 5,010.96 902.81 -88543 5,930,389.545 718,369.595 0.71 1,234.93 5,550.00 49.99 314.85 5,096.99 5,026.99 916.42 -898.96 5,930,402.757 718,355.682 2.32 1,253.641 5,575.00 49.60 314.19 5,113.13 5,043.13 929.81 -912.57 5,930,415.743 718,341.686 2.55 1,272.21 5,600.00 48.53 313.19 5,129.51 5,059.51 942.85 -926.23 5,930,428.386 718,327.659 5.24 1,290.51 5,625.00 47.52 312.46 5,146.23 5,076.23 955.49 -939.86 5,930,440.619 718,313.668 4.59 1,308.451 5,650.00 46.81 312.14 5,163.22 5,093.22 967.82 -953.42 5,930,452.558 718,299.756 2.99 1,326.10 3/2/2016 3:3759PM Page 7 COMPASS 5000.1 Build 61 by BP Has Final Survey Report HUGHES Company: North America - ALASKA - BP Local Coordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft Site: PB DS 16 MD Reference: orkb (gll 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM RSK - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (9100usft) (usft) 5,675.00 46.42 312.10 5,180.39 5,110.39 980.01 -966.89 5,930,464.346 718,285.932 1.56 1,343.58 5,700.00 46.51 312.07 5,197.61 5,127.61 992.16 -980.34 5,930,476.097 718,272.135 0.37 1,361.01 5,725.00 48.52 312.18 5,214.82 5,144.82 1,004.32 -993.80 5,930,487.868 718,258.335 0.32 1,378.46 5,750.00 48.41 312.39 5,232.04 5,162.04 1,016.52 -1,007.20 5,930,499.667 718,244.579 0.75 1,395.91 5,775.00 46.19 312.67 5,249.31 5,179.31 1,028.74 -1,020.52 5,930,511.492 718,230.911 1.20 1,413.33 5,800.00 46.06 312.90 5,266.64 5,198.64 1,040.98 -1,033.75 5,930,523.343 716,217.336 0.84 1,430.72 5,825.00 46.17 312.98 5,283.97 5,213.97 1,053.25 -1,046.94 5,930,535.229 718,203.795 0.50 1,448.12 5,850.00 46.29 313.01 5,301.26 5,231.26 1,065.56 -1,060.14 5,930,547.151 718,190.239 0.49 1,465.56 5,875.00 46.28 313.06 5,318.54 5,248.54 1,077.89 -1,073.35 5,930,559.093 718,176.680 0.15 1,483.02 5,900.00 46.43 313.09 5,335.79 5,265.79 1,090.25 -1,086.57 5,930,571.059 718,163.113 0.61 1,500.50 5,925.00 46.34 313.14 5,353.04 5,283.04 1,102.62 -1,099.78 5,930,583.040 718,149.547 0.39 1,518.00 5,950.00 46.15 313.21 5,370.33 5,300.33 1,114.98 -1,112.95 5,930,595.007 718,136.026 0.79 1,535.46 5,975.00 46.15 313.26 5,367.65 5,317.65 1,127.32 -1,126.08 5,930,606.970 718,122.538 0.14 1,552.89 6,000.00 46.45 313.28 5,404.92 5,334.92 1,139.71 -1,139.24 5,930,618.970 718,109.024 1.20 1,570.37 6,025.00 46.21 313.42 5,422.18 5,352.18 1,152.13 -1,152.39 5,930,630.996 718,095.520 1.04 1,587.87 6,050.00 46.29 313.53 5,439.47 5,369.47 1,164.55 -1,165.50 5,930,643.035 718,082.060 0.45 1,605.35 6,075.00 46.36 313.76 5,456.73 5,386.73 1,177.03 -1,178.58 5,930,655.129 718,068.620 0.72 1,622.87 6,100.00 46.33 314.09 5,473.99 5,403.99 1,189.58 -1,191.61 5,930,667.293 718,055.234 0.96 1,640.42 6,125.00 46.22 314.44 5,491.27 5,421.27 1,202.19 -1,204.55 5,930,679.521 718,041.936 1.10 1,657.97 6,150.00 46.05 314.78 5,508.60 5,438.60 1,214.85 -1,217.38 5,930,691.801 718,028.743 1.19 1,675.51 6,175.00 45.97 315.04 5,525.96 5,455.96 1,227.55 -1,230.12 5,930,704.123 718,015.642 0.81 1,693.03 6,200.00 46.01 315.25 5,543.33 5,473.33 1,240.29 -1,242.80 5,930,716.495 718,002.596 0.62 1,710.56 6,225.00 46.01 315.46 5,560.69 5,490.69 1,253.09 -1,255.44 5,930,728.919 717,989.590 0.60 1,728.11 6,250.00 45.96 315.65 5,578.06 5,508.06 1,265.92 -1,268.03 5,930,741.383 717,976.834 0.58 1,745.67 6,275.00 45.87 315.83 5,595.46 5,525.46 1,278.79 -1,280.56 5,930,753.874 717,963.734 0.63 1,763.22 6,300.00 45.66 315.98 5,612.90 5,542.90 1,291.65 -1,293.03 5,930,766.370 717,950.902 0.94 1,780.73 6,325.00 45.73 316.05 5,630.36 5,560.36 1,304.52 -1,305.45 5,930,778.876 717,938.109 0.34 1,798.23 31212016 3:37:59PM Page 8 COMPASS 5000.1 Build 61 by BP RAW Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project- Prudhoe Bay TVD Reference: orkb @ 70.00usft Site: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM R5K - Alaska PROD - ANCP7 Survey MD Inc Azi (azimuth) TVD TVDSS NIS ENV Northing Basting DLeg V. Sec (usft) (°) 0 (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 6,350.00 45.80 316.13 5,647.80 5,577.80 1,317.43 -1,317.87 5,930,791.414 717,925.318 0.36 1,815.76 6,375.00 45.85 316.23 5,665.22 5,595.22 1,330.36 -1,330.29 5,930,803.985 717,912.533 0.35 1,833.31 6,400.00 48.00 316.33 5,682.61 5,612.61 1,343.34 -1,342.70 5,930,818.599 717,899.749 0.67 1,850.90 6,425.00 46.32 316.42 5,699.93 5,629.93 1,356.40 -1,355.14 5,930,829.284 717,886.935 1.31 1,868.57 6,450.00 46.66 316.52 5,717.14 5,647.14 1,369.54 -1,367.63 5,930,842.061 717,874.071 1.39 1,886.33 I 6,475.00 47.00 316.68 5,734.24 5,664.24 1,382.79 -1,380.16 5,930,854.939 717,861.165 1.44 1,904.21 6,500.00 47.30 316.76 5,751.24 5,681.24 1,396.13 -1,392.72 5,930,867.911 717,848.218 1.22 1,922.18 6,525.00 47.63 316.85 5,768.15 5,698.15 1,409.56 -1,405.33 5,930,880.968 717,835.224 1.35 1,940.25 6,550.00 47.95 318.96 5,784.94 5,714.94 1,423.09 -1,417.98 5,930,894.116 717,822.187 1.32 1,958.43 6,575.00 48.23 317.12 5,801.64 5,731.64 1,436.70 -1,430.86 5,930,907.358 717,809.118 1.22 1,976.69 6,600.00 48.54 317.28 5,818.24 5,748.24 1,450.42 -1,443.36 5,930,920.696 717,796.027 1.33 1,995.05 6,625.00 48.93 317.51 5,834.73 5,764.73 1,464.25 -1,456.08 5,930,934.152 717,782.910 1.71 2,013.53 6,650.00 49.38 317.61 5,851.08 5,781.08 1,478.20 -1,468.84 5,930,947.732 717,769.749 1.63 2,032.13 6,675.00 49.73 317.69 5,867.30 5,797.30 1,492.26 -1,481.66 5,930,961.414 717,756.530 1.42 2,050.84 6,700.00 49.84 317.76 5,883.44 5,813.44 1,506.39 -1,494.50 5,930,975.160 717,743.284 0.49 2,069.63 6,725.00 49.76 317.82 5,899.58 5,829.58 1,520.53 -1,507.33 5,930,988.924 717,730.050 0.37 2,088.42 6,750.00 49.90 317.79 5,915.71 5,845.71 1,534.69 -1,520.16 5,931,002.698 717,716.814 0.57 2,107.23 6,775.00 49.97 317.74 5,931.80 5,861.80 1,548.85 -1,533.02 5,931,016.484 717,703.548 0.32 2,126.06 6,800.00 49.89 317.70 5,947.89 5,877.89 1,563.01 -1,545.89 5,931,030.258 717,690.273 0.34 2,144.88 6,825.00 49.66 317.66 5,964.03 5,894.03 1,577.12 -1,558.74 5,931,043.992 717,677.017 0.93 2,163.66 6,850.00 49.48 317.61 5,980.25 5,910.25 1,591.18 -1,571.57 5,931,057.673 717,663.792 0.74 2,182.38 6,875.00 49.42 317.55 5,995.50 5,926.50 1,605.20 -1,584.38 5,931,071.318 717,650.577 0.30 2,201.07 6,900.00 48.34 317.42 6,012.84 5,942.84 1,619.15 -1,597.17 5,931,084.886 717,637.393 1.96 2,219.67 6,925.00 48.93 317.37 6,029.27 5,959.27 1,633.02 -1,609.93 5,931,098.382 717,624.236 0.16 2,238.20 6,950.00 48.78 317.35 6,045.71 5,975.71 1,646.87 -1,622.68 5,931,111.854 717,611.087 0.60 2,256.70 6,975.00 48.61 317.31 6,062.22 5,992.22 1,660.68 -1,635.41 5,931,125.287 717,597.963 0.69 2,275.16 - 7,000.00 48.52 317.26 6,078.76 6,008.76 1,674.45 -1,648.12 5,931,138.682 717,584.855 0.39 2,293.58 aWO16 3:3759PM Page 9 COMPASS 5000.7 Build 61 by BP welaw Final Survey Report RAKER HUGHES Company: North America -ALASKA - BP Project: Prudhoe Bay Local Coordinate Reference: Well 16-15 Site: PB DS 16 TVD Reference: orkb Q 70.00usft Well: 16-15 MD Reference: orkb @ 70.00usft Wellbore: 18-15A North Reference: True Survey Calculation Method; Minimum Curvature Design: 16-15A Database: EDM R5K-Alaska PROD -ANCP1 Survey MD Inc Azi(azimuth) TVD TVDSS NIS EW Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°IIOOusf) (usft) 7,025.00 48.58 317.22 6,095.31 6,025.31 1,688.21 -1,660.84 5,931,152.062 717,571.742 0.20 2,311.98 7,050.00 48.62 317.23 6,111.85 6,041.85 1,701.97 -1,673.58 5,931,165.449 717,558.615 0.24 2,330.40 7,075.00 48.59 317.22 6,128.38 6,058.38 1,715.74 -1,686.31 5,931,178.839 717,545.484 0.12 2,348.83 7,100.00 48.48 317.23 6,144.93 6,074.93 1,729.49 -1,699.04 5,931,192.214 717,532.368 0.44 2,367.23 7,125.00 48.41 317.28 6,161.52 6,091.52 1,743.23 -1,711.73 5,931,205.578 717,519.278 0.32 2,385.61 7,150.00 48.38 317.37 6,178.12 6,108.12 1,756.97 -1,724.40 5,931,218.947 717,506.213 0.29 2,403.99 7,175.00 48.35 317.45 6,194.73 6,124.73 1,770.73 -1,737.05 5,931,232.329 717,493.175 0.27 2,422.35 7,200.00 48.23 317.51 6,211.36 6,141.36 1,784.48 -1,749.66 5,931,245.712 717,480.168 0.51 2,440.70 7,225.00 48.10 317.59 6,228.04 6,158.04 1,798.23 -1,762.23 5,931,259.085 717,467.203 0.57 7,250.00 47.95 317.64 6,244.76 6,174.76 1,811.95 -1,774.76 5,931,272.443 717,454.281 0.62 2,459.02 7,275.00 47.84 317.69 6,261.52 6,191.52 1,825.66 -1,787.25 5,931,285.784 717,441.397 OAS 2,477.31 2,495.55 7,300.00 47.74 317.74 6,278.31 6,208.31 1,839.36 -1,799.71 5,931,299.115 717,428.547 0.43 2,513.78 7,325.00 47.62 317.78 6,295.15 6,225.15 1,853.05 -1,812.14 5,931,312.433 717,415.729 0.49 2,531.97 7,350.00 47.45 317.83 6,312.02 6,242.02 1,866.71 -1,824.53 5,931,325.730 717,402.951 0.70 2,550.12 7,375.00 47.38 317.84 6,328.94 6,258.94 1,880.36 -1,836.88 5,931,339.009 717,390.205 0.28 2,568.24 7,400.00 47.36 317.79 6,345.87 6,275.87 1,893.98 -1,849.23 5,931,352.273 717,377.463 0.17 2,588.34 7,425.00 47.32 317.79 6,362.81 6,292.81 1,907.60 -1,861.59 5,931,365.525 717,364.721 0.16 2,604.441 7,450.00 47.22 317.81 6,379.78 6,309.78 1,921.21 -1,873.92 5,931,378.765 717,351.997 0.40 2,622.51 7,475.00 47.05 317.79 6,396.78 6,326.78 1,934.70 -1,886.23 5,931,391.975 717,339.300 0.68 2,640.551 7,500.00 46.77 317.76 6,413.86 6,343.86 1,948.30 -1,898.50 5,931,405.132 717,326.643 1.12 7,525.00 46.76 317.78 6,430.99 6,360.99 1,961.79 -1,910.74 5,931,418.257 717,314.016 2,658.52 7,550.00 46.69 317.73 6,448.13 6,378.13 1,975.26 -1,922.98 5,931,431.370 717,301.393 0.07 2,676.44 7,575.00 46.56 317.65 6,465.29 6,395.29 1,988.70 -1,935.21 5,931,444.447 717,288.777 0.32 057 2,694.35 2712231 7,600.00 46.43 317.58 6,482.51 6,412.51 2,002.09 -1,947.43 5,931,457.479 717,276.170 0.56 2,730.07 7,625.00 46.34 317.50 6,499.75 6,429.75 2,015.45 -1,959.65 5,931,470.471 717,263.569 0.43 2,747.87 7,650.00 46.17 317.40 6,517.04 6,447.04 2,028.75 -1,971.87 5,931,483.415 717,250.975 0.74 2,765.63 L 7,675.00 _ 45.99 317.29 6,534.38 6,464.38 2,041.99 -1,984.07 5,931,496.298 717,238.395 0.79 2,783.33 372/2016 3:37:59PM Page 10 COMPASS 5000.1 Build 61 by BPFinal Survey Report BAKER •• HUGHES Company: North America -ALASKA - BP Azi (azimuth) TVD Project: Prudhoe Bay Local Co-ordinate Reference: Well 16-15 Site: PB DS 16 TVD Reference: orkb 70.00usft Well: 16-15 MD Reference: orkb 70.00usft Wellbore: 16-15A North Reference: True Design: 16-15A Survey Calculation Method: Minimum Curvature 317.18 6,551.77 Database: EDM R5K - Alaska PROD - ANCP1 Survey 5,931,509.122 717,225.824 0.68 MD (usft) Inc (°) Azi (azimuth) TVD TVDSS NIS ENV Northing Easting DLeg V. Sec (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 7,700.00 45.84 317.18 6,551.77 6,481.77 2,055.18 -1,996.26 5,931,509.122 717,225.824 0.68 2,800.97 7,725.00 45.83 317.06 6,569.19 6,499.19 2,068.32 -2,008.46 5,931,521.903 717,213.245 0.35 7,750.00 45.79 316.90 6,586.62 6,516.62 2,081.43 -2,020.69 5,931,534.647 717,200.641 0.49 2,818.58 2,836.18 7,775.00 45.61 316.71 6,604.08 6,534.08 2,094.47 -2,032.94 5,931,547.329 717,188.021 0.90 2,853.73 7,800.00 45.48 316.54 6,621.58 6,551.58 2,107.44 -2,045.20 5,931,559.939 717,175.394 0.71 2,871.23 7,825.00 45.21 316.39 6,639.16 6,569.16 2,120.33 -2,057.45 5,931,572.469 717,162.776 1.16 2,888.65 7,850.00 44.99 316.21 6,656.80 6,566.80 2,133.14 -2,069.68 5,931,584.911 717,150.176 1.02 2,906.00 7,875.00 45.01 316.02 6,674.48 6,604.48 2,145.88 -2,081.93 5,931,597.290 717,137.557 0.54 2,923.30 7,900.00 45.11 315.87 6,692.14 6,622.14 2,158.59 -2,094.24 5,931,609.644 717,124.889 0.58 7,925.00 45.07 315.76 6,709.79 6,639.79 2,171.29 -2,106.58 5,931,621.977 717,112.186 0.35 2,940.60 7,950.00 44.84 315.68 6,727.48 6,657.48 2,183.94 -2,118.91 5,931,634.259 717,099.492 0.95 2,957.91 2,975.17 7,975.00 44.78 315.59 6,745.22 6,675.22 2,196.53 -2,131.23 5,931,846.491 717,086.812 0.35 2,992.38 8,000.00 44.72 315.50 6,762.97 6,692.97 2,209.10 -2,143.56 5,931,658.690 717,074.127 0.35 3,009.57 8,025.00 44.55 315.40 6,780.76 6,710.76 2,221.61 -2,155.88 5,931,670.844 717,061.447 0.74 3,026.72 8,050.00 44.35 315.31 6,798.61 6,728.61 2,234.07 -2,168.18 5,931,682.937 717,048.789 0.84 3,043.80 8,075.00 44.21 315.27 6,816.51 6,746.51 2,246.47 -2,180.46 5,931,694.979 717,036.155 0.57 3,060.83 8,100.00 44.18 315.19 6,834.43 6,764,43 2,258.85 -2,192.74 5,931,706.989 717,023.528 0.25 3,077.83 8,125.00 44.16 315.15 6,852.36 6,782.36 2,271.20 -2,205.02 5,931,718.981 717,010.894 0.14 3,094.81 8,150.00 44.01 315.05 6,870.32 6,800.32 2,283.52 -2,217.29 5,931,730.939 716,998.264 0.66 3,111.77 8,175.00 43.76 315.02 6,888.34 6,818.34 2,295.78 -2,229.54 5,931,742.839 716,985.667 1.00 3,128.66 8,200.00 43.54 315.04 6,906.43 6,836.43 2,307.99 -2,241.74 5,931,754.688 716,973.123 0.88 3,145.48 8,225.00 43.47 315.03 6,924.56 6,854.56 2,320.17 -2,253.90 5,931,766.506 716,960.613 0.28 3,162.25 8,250.00 43.45 314.95 6,942.71 6,872.71 2,332.32 -2,266.06 5,931,778.305 716,948.104 0.23 3,179.01 8,275.00 4322 314.93 6,960.89 6,890.89 2,344.44 -2,278.20 5,931,790.065 716,935.613 0.92 3,195.72 8,300.00 42.98 314.90 6,979.14 6,909.14 2,356.50 -2,290.30 5,931,801.769 716,923.172 0.96 3,212.36 8,325.00 42.84 314.85 6,997.46 6,927.46 2,368.51 -2,302.36 5,931,813.423 716,910.767 0.58 3,228.94 8,350.00 42.68 314.82 7,015.81 6,945.81 2,380.48 -2,314.40 5,931,825.035 716,898.389 0.65 3,245.47 3/2/2016 3:37:59PM Page 11 COMPASS 5000.1 Build 61 by BPFinal Survey Report BAKE •• HUGHES Company: North America - ALASKA - BP TVD TVDSS Project: Prudhoe Bay Local Co-ordinate Reference: Well 16-15 Site: PB DS 16 TVD Reference: orkb @ 70.00usft Well: 16-15 MD Reference: orkb @ 70.00usft (usft) (°NOOusft) North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM R5K- Alaska PROD - ANCPI Survey 7,052.71 6,982.71 2,404.25 MD Inc (usft) (^) 8,375.00 8,400.00 8,425A0 8,450.00 8,475.00 8,500.00 8,525.00 8,550.00 8,575.00 8,600.00 8,625.00 8,650.00 8,675.00 8,700.00 8,725.00 8,750.00 8,775.00 8,800.00 8,825.00 8,850.00 8,875.00 8,900.00 8,925.00 8,950.00 8,975.00 9,000.00 9,025.00 V. Sec (usft) 3,261.93 3,278.32 3,294.61 3,310.84 3,327.04 3,343.18 3,359.22 3,375.18 3,391.12 3,407.01 3,422.81 3,438.51 3,454.14 3,469.78 3,485.49 3,501.27 3,517.12 3,533.08 3,549.14 3,565.33 3,581.62 3,597.98 3,614.47 3,631.09 3,647.81 3,664.60 3,681.47 3122016 3.37.59PM Page 12 COMPASS 5000.1 Build 61 Az1(mirnuth) TVD TVDSS NIS EIW Northing Basting DLeg (°) (usft) (usft) (usft) (usft) (usft) (usft) (°NOOusft) 42.44 314.80 7,034.22 6,964.22 2,392.40 -2,326.40 5,931,836.598 716,886.052 0.96 42.20 314.74 7,052.71 6,982.71 2,404.25 -2,338.34 5,931,848.099 716,873.764 0.97 41.87 314.73 7,071.28 7,001.28 2,416.03 -2,350.24 5,931,859.530 716,861.536 - 1.32 41.77 314.76 7,089.91 7,019.91 2,427.77 -2,362.08 5,931,870.916 716,849.361 0.41 41.67 314.79 7,108.57 7,038.57 2,439.49 -2,373.89 5,931,882.285 716,837.216 0.41 41.42 314.78 7,127.28 7,057.28 2,451.17 -2,385.65 5,931,893.618 716,825.114 1.00 41.05 314.68 7,146.08 7,078.08 2,462.76 -2,397.36 5,931,904.870 716,813.076 1.50 40.98 314.60 7,164.94 7,094.94 2,474.29 -2,409.03 5,931,916.053 716,801.073 0.35 40.94 314.47 7,183.82 7,113.82 2,485.79 -2,420.72 5,931,927.203 716,789.063 0.38 40.75 314.28 7,202.73 7,132.73 2,497.22 -2,432.40 5,931,938.293 716,777.050 0.91 40.45 314.10 7,221.72 7,151.72 2,508.56 -2,444.07 5,931,949.289 716,765.060 1.29 40.18 313.95 7,240.78 7,170.78 2,519.80 -2,455.70 5,931,960.187 716,753.109 1.15 40.10 313.83 7,259.89 7,189.89 2,530.97 -2,467.31 5,931,971.018 716,741.175 0.45 40.27 313.80 7,278.99 7,208.99 2,542.14 -2,478.95 5,931,981.843 716,729.216 0.68 40.49 313.83 7,298.03 7,228.03 2,553.36 -2,490.64 5,931,992.712 716,717.209 0.88 40.71 313.89 7,317.02 7,247.02 2,564.63 -2,502.37 5,932,003.639 716,705.157 0.69 40.96 314.00 7,335.93 7,265.93 2,575.97 -2,514.14 5,932,014.636 716,693.063 1.04 41.27 314.05 7,354.77 7,284.77 2,587.40 -2,525.96 5,932,025.712 716,680.916 1.25 41.64 314.05 7,373.50 7,303.50 2,598.91 -2,537.86 5,932,036.869 716,668.692 1.48 42.02 314.25 7,392.13 7,322.13 2,610.52 -2,549.82 5,932,048.130 716,656.397 1.61 42.19 314.32 7,410.68 7,340.68 2,622.22 -2,561.82 5,932,059480 716,644.063 0.71 42.49 314.42 7,429.15 7,359.16 2,634.00 -2,573.86 5,932,070.899 716,631.690 1.23 42.91 314.59 7,447.53 7,377.53 2,645.88 -2,585.95 5,932,082.427 716,619.260 1.74 43.26 314.81 7,465.79 7,395.79 2,657.89 -2,598.09 5,932,094.081 716,606.778 1.52 43.43 315.05 7,483.97 7,413.97 2,670.01 -2,610.24 5,932,105.841 716,594.284 0.95 43.63 315.27 7,502.10 7,432.10 2,682.22 -2,622.38 5,932,117.692 716,581.794 1.00 43.91 315.31 7,520.15 7,450.15 2,694.51 -2,634.54 5,932,129.624 716,569.276 1.13 V. Sec (usft) 3,261.93 3,278.32 3,294.61 3,310.84 3,327.04 3,343.18 3,359.22 3,375.18 3,391.12 3,407.01 3,422.81 3,438.51 3,454.14 3,469.78 3,485.49 3,501.27 3,517.12 3,533.08 3,549.14 3,565.33 3,581.62 3,597.98 3,614.47 3,631.09 3,647.81 3,664.60 3,681.47 3122016 3.37.59PM Page 12 COMPASS 5000.1 Build 61 by BPFinal Survey Report BAKER HUGHES HUGHES Company: North America - ALASKA -BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft Site. PB DS 16 MD Reference: orkb @ 70.00usft Well: 1&15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM R5K - Alaska PROD - ANCP1 Survey_- MD Inc Ari (azimuth) TVD TVDSS N/S ENV Northing Easting DLeg V. Sec lush) )°) (°) (usft) (usft) )usft) (usft) (usft) (usft) (°HOOusft) )usft) 9,050.00 44.08 315.30 7,538.13 7,468.13 2,706.86 -2,646.76 5,932,141.608 716,556.710 0.68 3,696.41 9,075.00 44.35 315.38 7,556.05 7,486.05 2,719.26 -2,659.01 5,932,153.646 716,544.101 1.10 3,715.42 9,100.00 44.71 315.49 7,573.87 7,503.87 2,731.75 -2,671.31 5,932,165.774 716,531.442 1.47 3,732.54 9,125.00 45.03 315.56 7,591.59 7,521.59 2,744.33 -2,683.67 5,932,177.995 716,518.725 1.30 3,749.76 9,150.00 45.24 315.63 7,609.23 7,539.23 2,756.99 -2,696.07 5,932,190.288 716,505.965 Dail 3,767.07 9,175.00 45.37 315.66 7,626.81 7,556.81 2,769.70 -2,708.49 5,932,202.628 716,493.178 0.53 3,784.43 9,200.00 45.72 315.70 7,644.32 7,574.32 2,782.47 -2,720.96 5,932,215.027 716,480.345 1.40 3,801.86 9,225.00 46.11 315.70 7,661.71 7,591.71 2,795.32 -2,733.50 5,932,227.509 716,467.436 1.56 3,819.41 9,250.00 46.42 315.68 7,679.00 7,609.00 2,808.24 -2,746.12 5,932,240.063 716,454.448 1.24 3,837.06'' 9,275.00 46.63 315.70 7,698.20 7,626.20 2,821.23 -2,758.79 5,932,252.670 716,441.404 0.84 3,854.78 9,300.00 46.79 315.75 7,713.34 7,643.34 2,834.26 -2,771.50 5,932,265.325 716,428.328 0.66 3,872.57 9,325.00 47.19 315.78 7,730.39 7,660.39 2,847.35 -2,784.25 5,932,278.046 716,415.201 1.80 3,890.43 9,350.00 47.52 315.81 7,747.33 7,677.33 2,860.54 -2,797.07 5,932,290.850 716,402.003 1.32 3,908.41 9,375.00 47.69 315.84 7,764.18 7,694.18 2,873.78 -2,809.94 5,932,303.712 716,388.759 0.69 3,926.46 9,400.00 47.77 315.84 7,781.00 7,711.00 2,887.05 •2,822.82 5,932,316.603 716,375.491 0.32 3,944.54 9,425.00 47.87 315.82 7,797.79 7,727.79 2,900.34 -2,835.73 5,932,329.510 716,362.203 0.40 3,962.66 9,450.00 48.10 315.76 7,814.52 7,744.52 2,913.65 -2,848.68 5,932,342.442 716,348.871 0.94 3,980.81 9,475.00 48.22 315.67 7,831.20 7,761.20 2,926.98 -2,861.69 5,932,355.391 716,335.485 0.55 3,999.01 9,500.00 48.26 315.60 7,847.85 7,777.85 2,940.32 -2,874.73 5,932,368.338 716,322.064 0.26 4,017.23 9,525.00 48.30 315.51 7,864.48 7,794.48 2,953.64 -2,887.80 5,932,381.274 716,308.817 0.31 4,035.45 9,550.00 48.41 315.40 7,881.10 7,811.10 2,966.95 -2,900.90 5,932,394.202 716,295.132 0.55 4,053.69 9,575.00 48.61 315.29 7,897.66 7,827.66 2,980.27 -2,914.06 5,932,407.135 716,281.589 0.87 4,071.961 9,600.00 48.72 315.27 7,914.17 7,844.17 2,993.61 -2,927.27 5,932,420.084 716,268.000 0.44 4,090.27 9,625.00 48.32 315.30 7,930.73 7,860.73 3,006.92 -21940.45 5,932,433.004 716,254.442 1.60 4,108.55. 9,650.00 48.07 315.32 7,947.39 7,877.39 3,020.17 -2,953.55 5,932,445.866 716,240.957 1.00 4,126.73 9,675.00 47.96 315.37 7,964.12 7,894.12 3,033.39 -2,966.61 5,932,458.699 716,227.519 0.46 4,144.861 9,700.00 47.86 315.41 7,980.87 7,910.87 3,046.60 -2,979.64 5,932,471.522 716,214.112 0.42 4,162.97' 3/2/2016 3:37:59PM Page 13 COMPASS 5000.1 Build 61 Ez Company: Project: Site: Well: Wellbore: Design: may MD jusft) 9,725.00 9,750.00 9,775.00 9,800.00 9,825.00 9,850.00 9,875.00 9,900.00 9,925.00 9,950.00 9,975.00 10,000.00 10,025.00 10,050.00 10,075.00 10,100.00 10,125.00 10,150.00 10,175.00 10,200.00 10,225.00 10,250.00 10,275.00 10,300.00 10,325.00 10,350.00 10,375.00 3112016 3:37:59PM Inc BP TVD HARG NIS Final Survey Report Northing BAKER DLeg V. Sec 1'1 HUGHES North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 (usft) Prudhoe Bay TVD Reference: orkb 70.00usft (usft) PB DS 16 MD Reference: orkb 70.00usft 7,927.89 1615 North Reference: True 716,200.745 16-15A Survey Calculation Method: Minimum Curvature 315.37 16 -ISA Database: EDM R5K- Alaska PROD - ANCP7 -3,005.56 9,725.00 9,750.00 9,775.00 9,800.00 9,825.00 9,850.00 9,875.00 9,900.00 9,925.00 9,950.00 9,975.00 10,000.00 10,025.00 10,050.00 10,075.00 10,100.00 10,125.00 10,150.00 10,175.00 10,200.00 10,225.00 10,250.00 10,275.00 10,300.00 10,325.00 10,350.00 10,375.00 3112016 3:37:59PM Inc AN (uhluth) TVD TVDSS NIS ENV Northing Besting DLeg V. Sec 1'1 0 (usft) (usft) (waft) (usft) (usft) (usft) (°1100usft) (usft) 47.62 315.40 7,997.69 7,927.89 3,059.77 -2,992.63 5,932,484.314 716,200.745 0.96 4,181.03 47.21 315.37 8,014.60 7,944.60 3,072.88 -3,005.56 5,932,497.036 716,187.443 1.64 4,198.991 47.22 315.30 8,031.58 7,961.58 3,085.92 -3,018.46 5,932,509.705 716,174.173 0.21 4,216.89 47.04 315.26 8,048.59 7,978.59 3,098.94 -3,031.35 5,932,522.343 716,160.908 0.73 4,234.77 46.74 315.30 8,065.68 7,995.68 3,111.91 -3,044.19 5,932,534.933 716,147.695 1.21 4,252.57 46.49 315.29 8,082.85 8,012.85 3,124.83 -3,056.98 5,932,547.469 716,134.545 1.00 4,270.30 46.36 315.18 8,100.08 8,030.08 3,137.68 -3,069.73 5,932,559.952 716,121.423 0.61 4,287.96 46.19 315.18 8,117.36 8,047.36 3,150.50 -3,082.46 5,932,572.391 716,108.322 0.68 4,305.58 45.86 315.31 8,134.72 6,064.72 3,163.28 -3,095.13 5,932,584.793 716,095.290 1.37 4,323.13 45.43 315.44 8,152.20 8,082.20 3,176.00 -3,107.69 5,932,597.145 716,082.370 1.76 4,340.57 45.20 315.55 8,169.78 8,099.78 3,188.67 -3,120.15 5,932,609.454 716,069.548 0.97 4,357.93 45.14 315.65 8,187.40 8,117.40 3,201.34 -3,132.55 5,932,621.755 716,056.781 0.37 4,375.25 45.06 315.75 8,205.05 8,135.05 3,214.02 -3,144.92 5,932,634.064 716,044.051 0.43 4,392.55 44.77 315.82 8,222.78 8,152.76 3,226.67 -3,157.23 5,932,646-352 716,031.360 1.18 4,409.80 44.59 315.96 8240.53 8,170.53 3,239.29 -3,169.47 5,932,658.612 716,018.784 0.82 4,426.99 44.43 316.06 8,258.36 8,188.36 3,251.90 -3,181.64 5,932,670.862 716,008.251 0.70 4,444.14 44.20 316.28 8,276.25 8,206.25 3,264.50 -3,193.73 5,932,683.104 715,993.796 1.11 4,461.23 43.83 316.61 8,294.23 8,224.23 3,277.09 -3,205.70 5,932,695.340 715,981.466 1,74 4,478.25 43.34 316.98 8,312.34 8,242.34 3,289.65 -3,217.50 5,932,707.554 715,969.307 2.21 4,495.16 42.95 317.33 8,330.58 8,260.58 3,302.18 -3,229.13 5,932,719.745 715,957.323 1.83 4,511.95 42.72 317.85 8,348.91 8,278.91 3,314.73 -3,240.59 5,932,731.956 715,945.500 1.69 4,528.67 42.36 318.31 8,367.33 8,297.33 3,32,7.31 -3,251.88 5,932,744.199 715,933.848 1.90 4,545.32 41.95 316.77 8,385.86 8,315.86 3,339.88 -3,262.99 5,932,756.444 715,922.379 2.05 4,561.87 41.85 319.30 8,404.50 8,334.50 3,352.47 -3,273.92 5,932,768.704 715,911.094 1.85 4,578.33 41.48 319.88 8,423.20 8,353.20 3,365.10 -3,284.67 5,932,781.015 715,899.980 1.68 4,594.741 41.12 320.40 8,441.99 8,371.99 3,377.76 -3,295.25 5,932,793.367 715,889.042 1.99 4,611.09 40.68- _ 321.02 8,460.88 8,390.88 3,390.43 -3,305.61 _ 5,932,805.728 715,87@313 2.39 _ 4,627.32 Page 14 COMPASS 5000.1 Build 61 by BP Final Survey Report BAKER HUGHES HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft Site: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM R5K-Alaska PROD - ANCP1 Survey MD Inc AN (aaimuth) TVD TVDSS NIS ENy Northing Easting DLeg V. Sec (usft) (°) (`) (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) 10,400.00 40.48 321.35 8,479.87 8,409.87 3,403.10 -3,315.80 5,932,818.098 715,867.756 1.17 4,643.47 10,425.00 40.38 321.57 8,498.90 8,428.90 3,415.78 -3,325.91 5,932,830.480 715,857.291 0.70 4,659.58 10,450.00 40.29 321.77 8,517.96 8,447.96 3,428.47 -3,335.94 5,932,842.876 715,846.892 0.63 4675.66 10,475.00 40.22 321.96 8,537.04 8,467.04 3,441.18 -3,345.92 5,932,855.287 715,836.552 0.57 4,691.73 10,500.00 40.29 322.03 8,556.12 8,486.12 3,453.91 -3,355.86 5,932,867.722 715,826.240 0.33 4,707.79 10,525.00 40.15 322.29 8,575.20 8,505.20 3,466.66 -3,365.77 5,932,880.177 715,815.971 0.87 4,723.85 10,550.00 40.29 322.47 8,594.29 8,524.29 3,479.45 -3,375.62 5,932,892.671 715,805.750 0.73 4,739.92 10,575.00 40.45 322.65 8,613.34 8,543.34 3,492.30 -3,385.47 5,932,905.236 715,795.537 0.79 4,756.04 10,600.00 40.48 322.86 8,632.36 8,562.36 3,505.22 -3,395.29 5,932,917.861 715,785.347 0.56 4,772.20 10,625.00 40.36 323.06 8,651.39 8,581.39 3,518.16 -3,405.05 5,932,930.510 715,775.212 0.71 4,788.35 10,650.00 40.21 323.19 8,670.46 8,600.46 3,531.09 -3,414.75 5,932,943.153 715,765.141 0.69 4,804.45 10,675.00 40.42 323.31 8,689.53 8,619.53 3,544.05 -3,424.43 5,932,955.826 715,755.091 0.90 4,820.57 10,700.00 40.38 323.45 8,708.57 8,638.57 3,557.05 -3,434.09 5,932,968.544 715,745.053 0.40 4,836.72 10,725.00 40.35 323.78 8,727.61 8,657.61 3,570.09 -3,443.70 5,932,981.294 715,735.074 0.86 4,652.87 10,750.00 40.38 324.12 8,746.66 8,676.66 3,583.18 -3,453.23 5,932,994.102 715,725.170 0.89 4,869.02 10,775.00 40.36 324.26 8,765.71 8,695.71 3,596.31 -3,462.70 5,933,006.953 715,715.319 0.37 4,885.18 10,800.00 39.94 324.33 6,784.82 8,714.82 3,609.40 -3,472.11 5,933,019.763 715,705.535 1.69 4,901.26 10,820.00 39.56 324.20 8,800.19 8,730.19 3,619.78 -3,479.58 5,933,029.923 715,697.768 1.92 4,914.03 10,840.01 40.83 326.00 8,815.48 8,745.48 3,630.37 -3,486.96 5,933,040.296 715,690.078 8.58 4,926.92 10,870.11 44.12 338.00 8,837.71 8,767.71 3,648.28 -3,496.41 5,933,057.920 715,680.117 29.01 4,947.11 10,900.70 52.00 349.00 8,858.18 8,788.18 3,670.06 -3,502.72 5,933,079.502 715,673.179 37.07 4,968.92 10,932.01 56.23 2.20 8,876.58 8,806.58 3,695.25 -3,504.58 5,933,104.634 715,670.587 36.69 4,991.27 10,960.19 59.08 14.12 8,891.69 8,821.69 3,718.75 -3,501.17 5,933,128.214 715,673.311 37.11 5,009.38 10,990.48 62.60 23.14 8,906.47 8,836.47 3,743.76 -3,492.70 5,933,153.459 715,681.051 28.47 5,026.101 11,020.27 70.21 27.87 8,918.39 8,848.39 3,768.36 -3,480.93 5,933,178.387 715,692.102 29.39 5,040.71 11,048.66 79.63 32.98 8,925.78 8,855.78 3,791.94 -3,467.05 5,933,202.368 715,705.295 37.45 5,053.351 11,080.23 83.85 41.99 8,930.32 8,860.32 3,816.69 -3,448.05 5,933,227.659 715,723.566 31.24 5,084.26 _ 322018 397:59PM Page 15 COMPASS 5000.1 Build 61 by BP Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 16 Well: 16-15 Wellbore: 16-15A Design: 16-15A Survey MD Inc (usft) 1°I 11,110.23 11,140.07 11,170.25 11,200.28 11,230.42 11,260.19 11,280.40 11,300.40 11,330.20 11,360.50 11,390.31 11,410.28 11,430.28 11,460.51 11,490.68 11,520.63 11,550.56 11,580.43 11,610.32 11,640.51 11,650.00 KOP Billet 11,680.11 11,710.26 11,740.26 11,770.28 11,800.36 3/2!1018 3:37:59PM Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 16-15 orkb @ 70.00usB orkb @ 70.00us0 True Minimum Curvature EDM R5K-Alaska PROD -ANCP1 AN (azimuth) ND TVDSS NIS EIW Northing Eating DLeg V. Sec (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 84.99 52.51 8,933.25 8,863.25 3,836.93 -3,426.15 5,933,248.522 715,744.864 35.11 5,069.81 87.14 61.87 8,935.30 8,865.30 3,853.04 -3,401.16 5,933,265.349 715,769.377 32.11 5,070.21 88.43 72.39 8,936.47 8,866.47 3,864.74 -3,373.41 5,933,277.852 715,796.772 35.09 5,065.42 92.76 82.08 8,936.15 8,866.15 3,871.37 -3,344.17 5,933,285.324 715,825.810 35.33 5,055.53 93.75 93.05 8,934.44 8,864.44 3,872.65 -3,314.15 5,933,287.473 715,855.776 36.49 5,040.70 94.88 103.91 8,932.19 8,862.19 3,868.28 -3,284.83 5,933,283.958 715,885.206 36.57 5,021.45 96.58 110.64 8,930.17 8,860.17 3,862.31 -3,265.64 5,933,278.552 715,904.561 34.18 5,006.22 97.32 113.45 8,927.75 8,857.75 3,854.86 -3,247.24 5,933,271.639 715,923.168 14.43 4,990.15 99.69 110.07 8,923.34 8,853.34 3,843.94 -3,219.88 5,933,261.513 715,950.838 13.75 4,966.37 101.43 106.29 8,917.79 8,847.79 3,834.64 -3,191.59 5,933,253.044 715,979.387 13.54 4,943.49 102.97 102.83 8,911.49 8,841 AS 3,827.32 -3,163.39 5,933,246.541 716,007.781 12.47 4,922.33 103.63 100.13 8,906.89 8,836.89 3,823.45 -3,144.35 5,933,243.227 716,026.928 13.57 4,908.95 103.79 97.44 8,902.15 8,832.15 3,820.48 -3,125.15 5,933,240.819 716,046.206 13.09 4,896.26 102.69 93.34 8,895.22 8,825.22 3,817.72 -3,095.66 5,933,238.910 716,075.561 13.69 4,878.39 100.90 87.69 8,889.05 8,819.05 3,817.46 -3,086.34 5,933,239.506 716,105.073 19.27 4,862.51 100.40 83.90 8,883.52 8,813.52 3,819.62 -3,036.99 5,933,242.516 716,134.345 12.55 4,848.78 100.71 79.09 8,878.03 8,808.03 3,823.97 -3,007.90 5,933,247.708 716,163.296 15.83 4,837.04 100.22 74.81 8,872.60 8,802.60 3,830.60 -2,979.29 5,933,255.168 716,191.698 14.19 4,827.50 101.50 69.60 8,866.97 8,796.97 3,839.56 -2,951.35 5,933,264.940 716,219.364 17.65 4,820.29 98.81 65.97 8,861.64 8,791.64 3,850.80 -2,923.85 5,933,276.969 716,246.528 14.81 4,815.23 97.25 65.10 8,860.32 8,790.32 3,854.69 -2,915.30 5,933,281.107 716,254.963 18.77 4,813,99 92.33 69.10 8,857.80 8,787.80 3,866.36 -2,887.67 5,933,293.570 716,282.239 21.02 4,809.24 93.60 64.45 8,856.24 8,78624 3,878.23 -2,860.01 5,933,306.237 716,309.544 15.97 4,804.63 92.33 58.37 8,854.69 8,784.69 3,892.56 -2,833.71 5,933,321.324 716,335.408 20.68 4,802.84 90.00 53.29 8,854.08 8,784.08 3,909.41 -2,808.89 5,933,338.888 716,359.730 18.61 4,803.97 90.21 46.68 8,854.02 8,784.02 3,928.74 -2,785.87 5,933,358.878 716,382.183 21.99 4,808.15 Page 16 COMPASS 5000.1 Build 61 BP NA FA 2 by Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft Site: PB DS 16 MD Reference: orkb C 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM RSK - Alaska PROD - ANCP1 Survey MD Inc Azi(azimuth) TVD TVDSS NIS E/W Northing Earning DI -eq V. Sec (usft) (°) (°( (usft) (usft) (usft) (usft) (usft) (usft) (°I100usft) (usft) 11,830.60 90.25 41.18 8,853.90 8,783.90 3,950.51 -2,764.90 5,933,381.247 716,402.512 18.19 4,815.48 11,860.32 89.36 36.46 8,854.00 8,784.00 3,973.66 -2,746.27 5,933,404.925 716,420.457 16.16 4,825.24 11,890.47 89.45 30.53 8,854.32 8,784.32 3,998.79 -2,729.64 5,933,430.527 716,436.350 19.67 4,837.72 11,920.35 88.28 25.92 8,854.91 8,784.91 4,025.10 -2,715.52 5,933,457.239 716,449.704 15.91 4,852.55 11,950.18 87.73 20.44 8,855.95 8,785.95 4,052.50 -2,703.79 5,933,484.962 716,460.633 18.45 4,869.55 11,980.38 86.40 15.45 8,857.50 8,787.50 4,081.18 -2,694.50 5,933,513.901 716,489.086 17.08 4,888.95 12,010.50 85.85 9.57 8,859.53 8,789.53 4,110.50 -2,687.99 5,933,543.401 716,474.738 19.56 4,910.36 12,040.38 84.59 4.67 8,862.02 8,792.02 4,140.04 -2,684.30 5,933,573.031 716,477.570 16.88 4,933.44 12,070.37 83.48 358.10 8,865.14 8,795.14 4,169.84 -2,683.58 5,933,602.840 716,477.426 22.10 4,958.33 12,100.40 86.22 351.75 8,867.84 8,797.84 4,199.61 -2,686.22 5,933,632.522 716,473.915 22.95 4,984.98 12,130.28 89.97 346.48 8,868.84 8,798.84 4,228.92 -2,691.86 5,933,661.655 716,467.429 21.64 5,012.82 12,162.84 95.97 340.65 8,867.15 8,797.15 4,260.09 -2,701.05 5,933,692.534 716,457.341 25.67 5,044.11 12,190.42 97.42 337.10 6,863.93 8,793.93 4,285.63 -2,710.92 5,933,717.783 716,446.735 13.82 5,071.00 12,220.48 100.69 331.86 8,859.20 8,789.20 4,312.41 -2,723.69 5,933,744.177 716,433.186 20.36 5,100.48 12,250.44 103.63 327.10 8,852.88 8,782.88 4,337.63 -2,738.56 5,933,768.957 716,417.599 18.37 5,129.74 12,280.12 106.66 321.84 8,845.13 8,775.13 4,360.94 -2,755.19 5,933,791.772 716,400.297 19.92 5,158.33 12,309.96 108.48 316.19 8,836.11 8,766.11 4,382.41 -2,773.83 5,933,812.688 716,381.040 19.05 5,186.41 12,340.34 108.47 315.16 8,826.48 8,756.48 4,403.02 -2,793.96 5,933,832.707 716,360.318 3.22 5,214.56 12,37246 107.22 322.77 8,816.63 8,746.63 4,426.07 -2,814.01 5,933,855.161 716,339.608 22.88 5,244.74 12,400A2 105.57 329.25 6,808.81 8,738.81 4,448.06 -2,828.83 5,933,876.711 716,324.157 23.25 5,271.24 12,430.42 100.93 334.29 8,801.87 8,731.87 4,474.04 -2,842.76 5,933,902.269 716,309.478 22.28 5,300.65 12,460.55 97.54 340.98 8,797.03 8,727.03 4,501.52 -2,854.06 5,933,929.413 716,297.386 24.63 5,329.94 12,490.18 91.35 343.24 8,794.73 8,724.73 4,529.62 -2,863.13 5,933,957.235 716,287.507 22.23 5,358.57 12,520.59 85.11 342.41 8,795.67 8,725.67 4,558.64 -2,872.10 5,933,985.986 716,277.697 20.70 5,387.94 12,550.22 79.38 340.99 8,799.67 8,729.67 4,586.51 -2,881.31 5,934,013.568 716,267.680 19.91 5,416.45 12,600.00 • 79.38 340.99 8,808.84 8,738.84 4,632.77 -2,897.25 5,934,059.343 716,250.407 0.00 5,464.12 Projection to TD 3/2/2016 3: 37.59PM Page 17 COMPASS 5000.1 Build 61 BP by Final Survey Report Company: North America -ALASKA -BP Local Co-ordinate Reference Project- Prudhoe Bay Site: PB DS 16 ND Reference MD Reference: Well: 1615 Casing Hole North Reference: Wellbore: 16-15A Survey Calculation Method: Design: 16-15A Database. Well 1615 orkb 70.00usft orkb 70.00usft True Minimum Curvature EDM R5K- Alaska PROD - ANCP1 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (ush) Name (in) (in) 2,505.00 2,504.94 133/8" 13.375 17.500 _ 10,789.00 8,776.40 95/8" 9.625 12.250 Design Annotations Measured Vertical Local Coordinates Depth Depth +NI -S +PJ -W (usft) (usft) (usft) (usft) Comment 11,650.00 8,860.32 3,854.69 -2,915.30 KOP Billet 12,600.00 8,808.84 4,632.77 -2,897.25 Projection to TD Approved By: Yosha Ragbirsingh Survey Manager Baker Hughes RAW BAKER HUGHES 322016 3:37:59PM Page 18 COMPASS 5000.1 Build 61 1&16 bgePtt: PaBsa.: PDBWy_ _ rb a�rxu.i is I6 � Well. T/p WNlbore: 16-150 !T �4 MCTM Design: 16 -15A116 -1618-16A1 evA� BMuER ■ nuem Post Drilling 9;i; aw°'r•eoqu kNaatx am@rowwn CeGYIon AIMW'. kmunCuaua BMuER ■ nuem Post Drilling /�OOGCC OFFSET REPORT Eastmg(0 ftli) 35 . n U 0 0 0 0 u 0 0 o a °i J m Z9 m m o u m � u 0 0 0 0 0 0 0 0 $' 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16-13h6-13 5935550 p 5935300 h yDo 5935300 O 59 4950 5934950 16 -14!16 14A16 -14116-74B 5934650 _ -_ 001, _ 5939600 5934250 p f1�-pi $116-1 SAP B i 8 a 5939250 5933900 16-1916-15A pp0 5933900 5933550 5933550 6 16- 600 5933200 5933200 j 5932850 5932850 o po Nppp 5932500 4/16-19 932500 5 P O 00 0 00 y5932150 � 5932150 4 C 5931800 ^ 9000 6p0% 600p N 5931800 C 5931450 03-13/0313 5931450 Z 0 p Fpp 59311 00 16-�d/16-26 0 - A000 5931100 5930750 \` 16-15A & 16-15APBl ACTUAL 59W50 5935000 5930100 \�\ y 60pO 5930050 16- 6;1 0 5930060 5929900 apo 16-11615 m 9 oU�O 16-11116 1 59292(10 o - p - � 5929350 O 5929000 �. 00 o 5929000 592%50 d o 00 15-29116-29 0 0 16-12/16-12A 5920650 5928300 i V J V J V V J J J J J .. 5926300 m a 0 m 0 0 0 Lmi 0 Vi W 0 Incl V 0 m O J 0 m qJ_ qV L 0 V 2i m. W N �JO.. d W N O...W pV p.•.. V p �...,p yJ N orkb®]O.00usfl 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Easting (350 usWin) /�OOGCC OFFSET REPORT North America - ALASKA - BP Prudhoe Bay PB DS 16 16-15 16-15A 16-15A Anticollision Summary Report 17 March, 2016 we'Ail 2 BAKER HUGHES /BOO GCC OFFSET REPORT hp Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 16 Site Error: 0.00usft Reference Weil: 16-15 Well Error: 0.0ousft Reference Wellbore 1615A Reference Design: 16-15A BP Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 16-15 orkb @ 70.00usft orkb @ 70.00usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum FS 11- BAKER HUGHES Reference 16-15A :ifter type: NO GLOBAL FILTER: Using user defined selection 8 filtering criteria To nterpolation Method: MD Interval 25.00usft Error Model: ISCWSA )epth Range: Unlimited Scan Method: Tray. Cylinder North tesuhs Limited by: Maximum canter -center distance of 1,211.02usft Error Surface: Elliptical Conic Survey Program Data 3/17/2016 From To (usft) (usft) Survey(Wellbore) Tool Name Description 100.00 10,800.00 GyroData Gyro (16-15) GYD-CT-CMS Gyrodata cont.casing m/s 10,820.00 11,640.51 CTK MWD 4-1/4"(16-15APB7) MWD MWD -Standard 11,650.00 12,550.22 CTK MWD 4-1/4"(16-i SA) MWD MWD -Standard Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore . Design (usft) (usft) (usft) (usft) PB DS 03 03-13-03-13-0313 9,543.91 9,875.00 599.91 873.76 -270.01 FAIL - Major Risk PB DS 16 16-11 - 16-11 - 16-11 2,767.72 2,775.00 475.34 52.91 422.43 Pass - Major Risk 16-12 - 16-12 - 1612 2,700.00 2,700.00 348.26 39.80 308.48 Pass - Major Risk 1612 - 16-12A - 16-12A 2,725.00 2,725.00 348.21 39.72 308.52 Pass - Major Risk 1613 - 16-13 - 16-13 3,569.19 3,650.00 223.06 55.88 168.05 Pass - Major Risk 1614-1614-1614 1,799.73 1,800.00 119.90 26.25 93.65 Pass - Major Risk 16-14- 16-14A- 16-14A 1,803.58 1,800.00 119.95 26.30 93.65 Pass -Major Risk 1614-16-148-16148 1,802.73 1,800.00 119.94 26.29 93.65 Pass - Major Risk 1615-1615-1615 10,849.94 10,850.00 0.99 4.73 -3.30 FAIL - Major Risk 1615-16-15APBI-16-15APB1 11,650.00 11,650.00 0.00 1.26 -1.06 FAIL - Major Risk 16-16-16-16-1616 3,357.62 3,350.00 68.88 47.14 22.60 Pass - Major Risk 1628 - 16-28 - 1628 2,767.36 2,775.00 158.99 39.70 119.29 Pass - Major Risk 1629 - 1629 - 1629 2,100.36 2,100.00 300.55 30.55 270.00 Pass - Major Risk 1629 -16 -29A -16-29A 2,100.36 2,100.00 300.55 30.55 270.00 Pass - Major Risk 31172016 5:33:26PM Page 2 of 3 COMPASS 5000.1 Build 61 BP I/as by Anticollision Report BAKER HUGHES Company: North America -ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 16 Site Error: 0.00usft Reference Well: 16-15 Well Error: 0.00usft Reference Wellbore 16-15A Reference Design: 16-15A Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 16-15 orkb @ 70.00usft orkb @ 70.00usft True Minimum Curvature 1.00 sigma EDM RSK - Alaska PROD - ANCP1 Onset Datum Reference Depths are relative to orkb @ 70.00usft Coordinates are relative to: 16-15 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone D4 Central Meridian is 150" 0'0.000 W - Grid Convergence at Surface is: 1.860 Ladder Plot Measured Depth (2500 usfilin) LEGEND -1111- 0313,03-13,03-13V1 $ 16-14,16-14,16-14V10 -A- 16-16,16-16,16-16V1 -A- 16-11,16-11,16-11V1 -6- 16-14,16-14A,16-14AV11 $ 16-28,16-28,16-28V1 $ 16-12,16-12,16-12V1 -Ar 16-14,16-146,16-14BV5 $ 16-29,16-29,16-29Vl $ 16-12,16-12A,16-12AV3 -;-- 16-15,16-15,16-15V1 16-29,16-29A,16-29AV0 $ 16-13,16-13,16-13V1 $ 16-15,16-15APB1,16-15APB1V0 $ 16-15A 31172016 5,33.26PM Page 3 of 3 COMPASS 5000.1 Build 61 STATE OF ALASKA -ASKA OIL AND GAS CONSERVATION COMMI° REPORT OF SUNDRY WELL OPERAR .S 1. Operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown IZ Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: ❑ 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development ® Exploratory ❑ 5. Permit [o Drill Number: 215-187 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigraphic ❑ Service ❑ 1 6. API Number: 50.029-21474.01-00 7. Property Designation (Lease Number): ADL 028332 8. Well Name and Number: PBU 16 -ISA 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: MWD/GR/RES PRUDHOE BAY, PRUDHOE OIL 11. Present Well Condition Summary: , Total Depth: measured 12600 feet Plugs measured None feet true vertical 8809 feet Junk measured None feett MAR Z 9 201[ Effective Depth: measured 12600 feet Packer measured 10592 feet true vertical 8609 feet Packer true vertical 8626 feet aOnG Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20" 32-112 32-112 1490 470 Surface 2473 13-3/8" 32-2505 32-2505 3450/4930 1950/2670 Intermediate 10759 9-5/8" 30-10789 30-8777 6870 4760 Production Liner 4818 7' 6006-10825 5409-8804 7240/8160 5410/7020 Perforation Depth: Measured depth: 10825 - 12600 feet True vertical depth: 8804 - 8809 feet feet Tubing (size, grade, measured and true vertical depth) 4-1/2", 12.61 13Cr80 28-10648 28-8669 Packers and SSSV (type, measured and 4-1/2" TIW HBBP Packer 10592 8626 true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 010 0 Subsequent to operation: 0 0 0 10 0 14.Attachments:(reusvd per 20 nec 25mo.25071, a 25.283) 15. Well Class after work: Daily Report of Well Operations IZ Exploratory ❑ Development m Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status atter work: Oil ❑ Gas ❑ WDSPL ❑ Of SI(1gWofN Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 316.169 Contact Boltz, Travis Email Travis.Boltz@bp.com Printed Name Joe a Title Drilling Technologist Signature Phone +1 907 564 4091 Data 3/7-5/I Form 10-404 Revised 512015 vrc. ¢117-11` RBDMS 4V MAR 31 1016F 1-1110,11e,ubmit Original Only North America - ALASKA- BP Page 1 of to Operation Summary Report Common Well Name: 16-15 AFE No X3.017H9-C: (2,588,122.00 ) Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/18/2016 End Date: 2/27/2016 Project: Prudhoe Bay Site: PB DS i6 Rig Name/No.: NORDIC 2 Spud DateRme: 11/25/1985 12:00:OOAM Rig Release: 2/28/2016 Rig Contractor: NORDIC CALISTA UWL 500292147400 Active datum: orkb Q70.00usft (above Mean Sea Level) Date From - To Him Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 2/18/2016 10:30 - 12:00 1.50 MOB P PRE RIG RELEASED FROM 16-17 AT 1030 HRS. PREPARE FOR MOVING RIG OFF OF 16-17. COMPLETE PREP OF RIG AND SITE. - PJSM FOR MOVING RIG OFF OF 16-17; DISCUSSION FOCUSED ON: PLACING PHYSICAL BARRIERS (12"X12" CHOCK) IS IN PLACE TO PREVENT THE RIG FROM ROLLING BACK TOWARDS TREEMELLHEAD. ESD IN CELLAR IS FUNCTION TESTED AND MANNED BY THE FIELD SUPERINTENDENT RADIO COMMUNICATION VERIFIED FOR ALL INDIVIDUALS INVOLVED IN THE MOVE (SPOTTERS, ETC). THE AGREED PHYSICAL SIGN 'COMMAND" TO STOP THE RIG MOVE IS UNDERSTOOD BY ALL MOVE RIG OFF WITH NO ISSUES, PAD OPERATOR ON SITE TO MONITOR MOVE OFF. STAGE ON PAD. 12:00 - 14:00 2.00 MOB - P PRE REPAIR SUCTION LINE IN PIT 1 - CHARGED MAINTENANCE TO NORDIC - CONDUCT ROUTE DRIVE WHILE REPAIR IS BEING COMPLETED 14:00 - 16:00 2.00 MOB P PRE PJSM FOR MOVING RIG ACROSS PAD. DISCUSS OBSTACLES, APPROACH TO WELL 16-15. - MOVE RIG ACROSS PAD. STAGE IN FRONT OF WELL 16.15. PJSM ON MOVING OVER WELL. PLACING PHYSICAL BARRIERS (12"X12" CHOCK) IS IN PLACE TO PREVENTTHE RIG FROM ROLLING BACK TOWARDS TREEIWELLHEAD. ESD IN CELLAR IS FUNCTION TESTED AND MANNED BY THE FIELD SUPERINTENDENT RADIO COMMUNICATION VERIFIED FOR ALL INDIVIDUALS INVOLVED IN THE MOVE (SPOTTERS, ETC). THE AGREED PHYSICAL SIGN "COMMAND' TO STOP THE RIG MOVE IS UNDERSTOOD BY ALL MOVE OVER WELL WITH NO ISSUES. PAD OPERATOR ON LOCATION DURING MOVE OVER. Printed 3/28/2016 10:21:39AM North America - ALASKA- BP Page 2 of 18 Operation Summary Report Common Well Name: 16-15 AFE No X3-017H&C: (2,588,122.00) Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/18/2016 End Date: 2/27/2016 Pmject: Prudhoe Bay Site: PB DS 16 Rig Name/No.: NORDIC 2 Spud DateRme: 11/25/1885 12:00:00AM Rig Release: 2/28/2016 Rig Contractor: NORDIC CALISTA UN: 500292147400 Active datum: arkb @70.00usft (above Mean Sea Level) Date From - To Hm Task Code NPT NPT Depth Phase Description of Operations hr usft 16:00 - 22:30 6.60 MOB P PRE CREW CONTINUING WITH RIG UP AND COMPLETING RIG MOVE CHECKLIST (GREASING VALVES, PREPARING EQUIPMENT, CHANGING OUT EQUIPMENT) - RIG ACCEPT AT 16:30; CONTINUE NTH RIGGING UP FOR OPERATIONS - CYCLE TREE VALVES AND SSV, 1200 PSI ON TREE CAP BUT BLED OFF IMMEDIATELY (MOST LIKELY THERMAL) - CONDUCT LEAKTIGHT TESTAGAINST SWAB/ MASTER GOOD TEST -NIPPLE DOWN TREE CAP / NIPPLE UP BOPE -AOGCC JEFF JONES WAIVED WITNESS AT 1800 SPACE OUT AND SET LUBRICATORS -TREE WARMING UP. BLEED THERMAL PRESSURE OFF BETWEEN MASTER AND SWAB SET TEST PLUG 22:30 - 23:00 0.50 MOB P PRE PERFORM H2S / RIG EVACUATION DRILL PERFORM AAR. NEED TO GET TRAILER FOR DRILLERS SIDE. WITH WIND BLOWING FROM CELLAR TO EDGE OF PAD. TASK SCS WITH GETTING ANOTHER TRAILER DISCUSSED EMERGENCY NUMBERS FOR THE EOA/HARMONY RADIO USAGE 23:00 - 00:00 1.00 MOB P PRE FILL STACK AND PREP FOR BOPE SHELL TEST. 2/19/2016 00:00 - 02:00 2.00 BOPSUR P PRE PRESSURE STACK UP. GRAYLOCKLEAKING ON. BLEED DOWN. FIX. FLANGE ON CHOKE MANIFOLD LEAKING. PRESSURE UP. LEAK BETWEEN ANNULAR/TOT PERFORM PASSING SHELL TEST 250# / 4500# Pnnted 3/28/2016 10:21:39AM North America - ALASKA - BP Page 3 of 18 Operation Summary Report Common Well Name: 16-15 AFE No Event Type: RE-ENTER- ONSHORE(RON) Start Date: 2/18/2016 End Date: 2/272016 X3.017H9-C:(2,588,122.001 Project: Prudhoe Bay Site: PB DS 16 Rig Name/No.: NORDIC 2 Spud DateRme: 1125/1985 12.00:00AM Rig Release: 2/28/2016 Rig Contractor NORDIC CALISTA UW1: 500292147400 Active datum: orkb @70.00usft (above Mean Sea Level) Date From -To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft 02:00 - 06:00 4.00 BOPSUR P PRE START BOPE TEST. CONDUCT INITIAL TESTS FROM DRILLERS CONSOLE. TEST 91 250# / 4500# PASS- SHELL TEST CM# 9, 10, 11, 13 LUBRICATOR AND MM-3 TEST #2 250# / 3500# PASS- BLINDS, KILL HCR, CM# 3,4.8,7.12. 11, BOP 17 AND SAFETY VALVE #1 TEST #3 250# PRESSURE NOT STABILIZING. LOW PT VISIBLE FLUID COMING OUT TATTLE TAIL (BLINDS FAILED. WILL CONTINUE TESTING OTHER COMPONENTS) TEST #3 250# / 3500# (BLINDS OPEN) PASS- KILL MANUAL, CM# 1,2,6, 11,12 BOP 18, SAFETY VALVE #2 (X-OVER LEAKED. ISOLATE FROM SAFETY VALVE) TIGHTEN CROSSOVER TO SAFETY VALVE#2 TEST #4 250# / 3500# (BLINDS OPEN) PASS- KILL MANUAL, CM# 1,2, 5, 11, 12 SAFETY VALVE #2 PULL NIGHT CAP, PICKUP 2-3/8" TEST JOINT. CLOSE LOWER 2-3/8" COMBINATION PIPE/SLIP TEST #5 250# / 3500# PASS-2-3/8" CONDUCT ACCUMULATOR DRAWDOWN TEST FROM OPERATIONS CAB REMOTE PANEL CLOSE ANNULAR ON 2.3/8" TEST JOINT TEST#6250#/25009 PASS - CONDUCT PRE-SPUD MEETING WITH DAY CREW W:DO - 12:30 6.50 BOPSUR P PRE DISCUSS ANNULAR TEST REQUIRMENTS WITH TOOLPUSHER. AOGCC PERMIT REQUIRED 2500 PSI TEST, RE-TEST ANNULAR WITH 2-3/8" TEST JOING AND WITH 3.1/7TEST JOINTTO 3500 PSI PER BP WELL PLAN REQUIREMENT. GOOD TESTS. - CONTINUE WITH BOP TEST PER AOGCC, BP, AND NORDIC REQUIREMENTS TO 250 PSI LOW/ 3500 PSI HIGH. ALLSUCCESSIVE TESTS PASSED. 12:30 - 13:30 1.00 BOPSUR P PRE PJSM FOR HANDLING INJECTOR, STABBING ON FOR TESTING COIL AND INNER REEL IRON. DISCUSS PRESSURES AT RIG FLOOR AND IN REELHOUSE, WEAK LINKS, WHERE TEST WILL BE RECORDED. - STAB ON, BREAK CIRCULATION AND PRESSURE TEST INNER REEL VALVE TO 250 PSI LOW/ 3500 PSI HIGH. GOOD TEST. 13:30 - 14:15 0.75 BOPSUR P PRE VALVE CREW ON LOCATION TO CONFIRM TREE HEIGHTS, CONFIRM TORQUE ON TREE BOLTS. TREE TORQUE GOOD. POP OFF WITH INJECTOR AND STAND ASIDE. Pnnted 3/28/2016 10:21:39AM North America - ALASKA - BP Page 4 of 18 Operation Summary Report Common Well Name: 16-15 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/18/2016 End Date: 2/27/2016 X3.0171 -19-C: (2,588,122.00 ) Project: Prudhoe Bay Site: PB DS 16 Rig Name/No.: NORDIC 2 Spud Date/Tme: 11/25/1985 12:00:OOAM Rig Release: 2/28/2016 Rig Contractor: NORDIC CALISTA UW: 500292147400 Active datum: orkb @70.00usR (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations hr) (usft) 14:15 - 17:30 3.25 BOPSUR P PRE PJSM WITH VALVE CREW ON MOBILIZING LUBRICATOR TO RIG FLOOR. DISCUSS LIFT AND TASK LEADER. MOBILIZE TO FLOOR. - PJSM ON NU OF LUBRICATOR, PRESSURE TEST, PULLING TWC. - NU LUBRICATOR, PRESSURE TEST TO 250 PSI LOW / 3500 PSI HIGH. TEST PER CRITERIA IN WELL PLAN, GOOD TEST. - PULL TWC, 70 PSI UNDER TWC. PICK UP ABOVE VALVES, CLOSE IN FOR ISOLATION FROM WELL, BLEED PRESSURE. MONITOR VOID THROUGH WING VALVE, NO LUBRICATOR. - MOBILIZE LUBRICATOR OFF OF RIG 1730 - 1815 0.75 RIGU P PRE CONDUCT H2S RIG EVAC DRILL WITH DAV CREW. CONDUCTAAR. 18:15 - 19:20 1.08 RIGU P PRE CIRCULATE DIESEL OUT OF REEL 19:20 - 20:00 0.67 RIGU P PRE PJSM, REVERSE CIRCULATE E -LINE. POP OFF WELL, TAKE NOZZLE OFF STAB BACK ON. REVERSE CIRCULATE, WIRE MOVING. 20:00 - 21:40 1.67 RIGU P PRE PJSM FOR CUTTING COIL, BLOW FLUID BACK FOR COIL CONNECTOR INSTALL. POP OFF INSTALL NIGHT CAP. CUT 270' OF PIPE. INITIATED HOT WORK FOR DRESSING COIL AND BOOTING CABLE. - CONNECTOR INSTALLED. PULLTESTT041K INSTALL NOZZLE AND PUMP CABLE FORWARD. 21:40 - 00:00 2.33 RIGU P PRE TEST E -LINE GOOD -MAKE UP BHI UQC -GOOD TEST ON UQC -STAB ON WELL / FILL COIL AND STACK. 2/20/2016 00:00 - 01:30 1.50 RIGU P PRE PERFORM PT OF LUBRICATOR BREAK/ FLOATS - LOW/ HIGH 250# 13500# CHARTED PASS. -OPEN WELL TO CLOSED CHOKE. PRESSUREAT30# -BLED OFF, PRESSURE CAME BACK UP TO 30#. CHECKAT NEEDLE VALVE ON INJECTOR. GAS -OPEN CHOKE AND LEFT OPEN TO TIGER TANK FLOW BLED DOWN THEN STARTED INCREASING. -FLOW VERIFIED AT TIGER TANK. SHUTIN AND PREPARE FOR BOTTOM KILL. PRESSURE WAS 70# WHEN WE SHUT IN. 01:30 - 04:00 2.50 CONDHL P PRE LEAK TIGHT MASTER/SWAB. GOOD TEST. POP OFF INJECTOR AND MAKE UP NOZZLE ASSEMBLY. WATER TEMP ON KCLAT 77 DEG. ORDERED 1% SLICK KCL WITH SAFELUBE AT 140 DEG. EXTRA METHANOL PUP ORDERED OUT, ARRIVED ON LOCATION. FINISH SPOTTING IN BLEED TANK FULL METHANOL PUP. 04:00 - 06:15 2.25 CONDHL N WAIT PRE WAITING ON WARM KCL. TAKE ON MUD INTO PITS, DOUBLE CHECK LINE-UPS FOR CIRC OUT. TRUCK ON LOCATION. -MONITOR WELLTHROUGH WING VALVE SENSOR, 125 PSI ON WELL. Printed 3/28/2016 10:21:39AM North America - ALASKA - BP Page 5 of 18 Operation Summary Report Common Well Name: 16-15 AFE No X3017H9-C: (2,588,122.00) Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/18/2016 End Date: 2/27/2016 Project: Prudhoe Bey Site: PB DS 16 Rig Name/No.: NORDIC 2 Spud DateRme: 11/25/1985 12:00:OOAM Rig Release: 2/28/2016 Rig Contractor: NORDIC CALISTA UN: 500292147400 Active datum: orkb Q70.00usft (above Mean Sea Level) Date From -To Hrs Task Code NPT NPT Depth Phase Description of Operations hr usft) 06:15 - 07:15 1.00 CONDHL P PRE BRING TRUCK AROUND, STAGE UP. COMPLETE PERMITS. CHECK WEIGHT, RU LINES. PJSM ON PUMPING OPERATION, FLUID SEQUENCE, DISPLACEMENT PATH. 07:15 12:15 5.00 CONDHL P PRE FILL COIL WITH 15 BELS METHANOL FOLLOWED BY WARM 8.35 PPG KCL. PLACE METHANOL AT NOZZLE. CLOSE IN WING VALVE, OPEN UP WELL TO TESTED INJECTOR AND CLOSED CHOKE. 121 PSI ON WELL. OPEN CHOKE TO FLOW BACK TANK - BREAK CIRCULATION WITH FLUIDS AND RI AT MIN RATE WHILE HOLDING BACKPRESSURE THROUGH CHOKE -TAKE GASEOUS FLUID RETURNS TO FLOW BACK TANK WHILE RIH. NO ENCOUNTER WITH ANY HYDRATES. -APPROACH WHIPSTOCK DEPTH, PUWAT WHIPSTOCK 47K, MOVE DOWN AND TAG WHIPSTOCK AT 10,833' UNCORRECTED MD AND SET DOWN 2K. - PICK BACK UP AND BRING PUMPS UP TO 5 BPM INITIAL RATE TO CIRCULATE WELL FROM BOTTOM WITH 8.35 PPG KCL. CIRCULATING PRESSURE AND WELLHEAD PRESSURE DROPPING EQUALLY, IN AND OUT RATES MOVING TOWARDS BEING 1 FOR 1 AS THE 8.35 PPG FLUID IS CIRCULATING OUT THE WELLBORE FLUID. DENSITY OUT INITIALLY 7.3 PPG, RISING WITH CIRCULATION. - KCLALL THE WAY AROUND, IN AND OUT WITH 8.30 PPG KCL, MAINTAIN 250 PSI BACKPRESSURE. SWAP TO 9.5 PPG MUD SYSTEM, CIRCULATE DOWN. CONTINUE CIRCULATING HOLDING BACKPRESSURE, MW IN 9.45 PPG, MW OUT 8.3 PPG. - CONTINUE CIRCULATING, MW IN 9.55 PPG, MW OUT 8.35 PPG WITH MUD COMING OUT OF NOZZLE. - 1 FOR 1 RETURNS WITH MUD ALL THE WAY AROUND, 9.55 PPG IN AND 9.50 PPG OUT. FLOW CHECK, WELL DEAD. - BLOW DOWN CHOKE AND HARD LINE TO BLOW BACK TANK, FLUSH MICROMOTION, PJSM FOR PCH 12:15 - 14:15 2.00 CONDHL P PRE POH WITH NOZZLE BHA, RETURNS ARE i FOR 1 WITH 9.50 PPG MUD ALL THE WAY AROUND. PJSM FOR LAYING DOWN BHAAND MAKING UP MILLING BHA WHILE TRIPPING OUT. PULL TO SURFACE, FLOW CHECK, WELL IS NOT FLOWING. - POP OFF WITH INJECTOR 14:15 - 14:40 0.42 STWHIP P WEXIT BREAK OFF AND LAY DOWN NOZZLE BHA MU 3.80" MILLING BHA WITH STRAIGHT MOTOR ONTO BHI SMART TOOLS. WINDOW MILL GAUGE 3.80" GO, STRING REAMER GAUGE AT 3.79" GO. - WELL STATIC, FLUID AT SURFACE Printed 3/28/2016 10.21:39AM North America - ALASKA - BP Page 6 of 18 Operation Summary Report Common Well Name: 16-15 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Data 2/18/2016 End Date: 2/27/2016 X3 -0171-19-C: (2,588,122.00) Project: Prudhoe Bay Site: PB DS 16 Rig Name/No.: NORDIC 2 Spud Date/Time: 11/25/1985 12:00:OOAM Rig Release: 2/28/2016 Rig Contractor. NORDIC CALISTA UWI: 500292147400 Active datum: orkb @70.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:40 - 16:45 2.08 STWHIP P WEXIT STAB ON WITH INJECTOR. ZERO COUNTER, PT OTS TO 250 PSI LOW WHILE WAITING ON EDC TO OPEN. BREAK CIRCULATION, RIH, HIGH PRESSURE TEST OF OTS WHILE RIH. - 9.45 PPG MWIN AND OUT, 1 FOR 1 RETURNS - SLACK OFF WEIGHT AT BOTTOM 23K, PICK UP WEIGHT 46K,CIRCULATION PRESSURE OF 825 PSI AT.55 BPM WITH EDC OPEN 16:45 - 18:00 1.25 STWHIP P WEXIT LOG PRIMARY DEPTH CONTROL FROM 10,600' WITH NO CORRECTION. PICK UPAND LOG CCL FROM 10,500'. 18:00 - 00:00 6.00 STWHIP P WEXIT CLOSE EDC. GET DRILLING PARAMETERS FREE SPIN =2908 PSI AT 2.86 BPM RATEIN=2.85BPM RATEOUT=2.85BPM MWIN=9.46PPG MWOUT=9.41PPG ECD = 10.58 PPG ROP = 1 FPH WOB = 1-2K CIRC PSI = 2900- 3100 PSI IAP = 364 PSI OAP = 520 PSI PVT = 298 BELS TAGGED PINCH POINTAT 10826.1' MILL WINDOW FROM 10826.1' TO 10,832' 2/21/2016 00:DO - 03:45 3.75 STWHIP P WEXIT FREE SPIN =2830 PSI AT 2.86 BPM RATEIN=2.85BPM RATEOUT=2.85BPM MWIN=9.46PPG MWOUT=9.41PPG ECD = 10.58 PPG ROP = 1 FPH WOB = u -1K CIRC PSI = 2900- 3100 PSI IAP =364 PSI OAP =520 PSI PVT =297 BBLS MILL WINDOW FROM 10,832'-10834.5 STRING REAMER EXIT 10835.5 SAMPLE SHOWING METAL/CHERT/SHALE 03:45 - 05:00 1.25 STWHIP P WEXIT START DRILLING RATHOLE FREE SPIN =2775 PSI AT 2.86 BPM RATEIN=2.83BPM RATEOUT=2.85BPM MWIN=9.45PPG MWOUT=9.41PPG ECD = 10.57 PPG ROP= 1 FPH WOB = 0-2.SK CIRC PSI = 2775- 2960 PSI IAP = 98 PSI OAP = 82 PSI PVT = 297 BBLS 05:00 - 06:45 1.75 STWHIP P WEXIT PU OFF BOTTOM. BACKREAM, WOR ZERO OFF BY 6.6K ZERO. START REAMING WINDOW NOTHING SEEN ON FIRST UP PASS. 2728# @ 2.87 BPM FREE SPIN SENT 10 BBLS LOVIS / 10 BBLS HIVIS SWEEP - CONDUCT FINAL REAM PASS AND THEN DRY DRIFT, BOTH GOOD PASSES. PICK UP INTO WINDOW WITH HI -VIS SWEEP AROUND AND UP, FLOW CHECK. FLOW CHECK GOOD. OPEN EDC, POH AT 3.0 BPM. - MW IN 9.45 PPG, MW OUT 9.42 PPG 06:45 - 08:45 2.00 STWHIP P WEXIT POH WITH MILLING BHA. 1 FOR 1 RETURNS ON TRIP OUT OF HOLE. - PJSM FOR CHANGING OUT BHA. PULLTO 200', FLOW CHECK WELL, ALL GOOD. - PULL TO SURFACE, POP OFF WITH INJECTOR. Printed 3128/2016 10:21:39AM North America - ALASKA - BP Page 7 of 18 Operation Summary Report Common Well Name: 16-15 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/182016 End Date: 2/27/2016 X34117H9-C: (2,588,122.00) Project: Prudhoe Bay Site: PB DS 16 Rig Name/No.: NORDIC 2 Spud Date/Mme: 11/25/1985 12:00:OOAM Rig Release: 2/282016 Rig Contractor: NORDIC CALISTA UWI: 500292147400 Aclive datum: orkb @70.00usft (above Mean Sea Level) Date From -To Him Task Code NPT NPT Depth Phase Description of Operations (hr) usft 08:45 - 09:45 1.00 DRILL P PRODI BREAKDOWNBHA. WINDOW MILL GAUGE AT 3.80" GO, 3.79" NO-GO. STRING REAMER LOOKS GOOD. - SHIFT BHA COMPONENTS AROUND, MU 3.75" BY 4.25" BUILD BHA ONTO 3.0° BENT MOTOR WITHOUT RESISTIVITY TOOL -STAB ON WITH INJECTOR, PRESSURE TEST QUICK TEST SUB WHILE EDC IS BEING CLOSED AND MECHANICAL COUNTER RESET 09:45 - 11:45 2.00 DRILL P PROD? RIH WITH DRILLING BHA PRESSURE TEST QTS TO HIGH WHILE RIH. 11:45 - 12:30 0.75 DRILL P PROD1 LOG TIE-IN TO PDC, -3' CORRECTION. CONTINUE TO RUN DOWN TO WINDOW. 12:30 - 18:00 5.50 DRILL P PROD1 FREE SPIN OF 2820 PSI AT 2.86 BPM. ON BOTTOM AT 10,243'. TOOK SEVERAL PICKUPS TO ENSURE ORIENTATION WAS ON TARGET AND TO NOT STALL DIFFERENTIALLY. - INITIAL IA PRESSURE AT 60 PSI, ROSE TO 200 PSI; INITIAL OA PRESSURE AT 95 PSI, ROSE TO 250 PSI - FLOW RATE OF 2.82-2.95 PSI, CIRC PRESSURE OF 2785:3700 PSI, WOB 1.65-4.8K - MW IN 9.47 PPG, MW OUT 9.43 PPG, ECD OF 10.6 PPG - NO LOSSES TO FORMATION - CONDUCT KICK WHILE DRILLING DRILL WITH NEW FLOORHAND ON TEAM. SIMULATED INCREASE IN PIT GAIN. CREW RESPONDED ACCORDING TO STANDING ORDERS. GOOD JOB IN MONITORING FOR FLOW, SIMULATING INCREASE IN FLOW, SHUTTING IN AND MAKING NOTIFICATIONS. CONDUCT AAR TO DISCUSS STANDING ORDERS WITH NEW FLOORHAND (ROTARY EXPERIENCE, NEW TO COIL SO STANDING ORDERS ARE DIFFERENT). 18:00 - 00:00 6.00 DRILL P PROD? DRILLED BUILD FROM 10940' TO 11168' FREE SPIN =2750 PSI AT 2.80 BPM RATEIN=2.80BPM RATEOUT=2.80BPM MWIN=9.50PPG MWOUT=9.47PPG ECD = 10.58 PPG ROP=60FPH WOB=0-5K CIRCPSI= 2750-3200 PSI IAP =40OPS1 OAP =492 PSI PVT =435 BBLS LOST 4 BBLS TO FORMATION 222/2016 00:00 - 02:40 2.67 DRILL P PROD? DRILLED BUILD FROM 11168' FREE SPIN =2750 PSI AT 2.80 BPM RATEIN=2.80BPM RATEOUT=2.BOBPM MWIN=9.48PPG MWOUT=9.47PPG ECD = 10.68 PPG ROP =60 FPH WOB=O-SK CIRC PSI 2750- 3200 PSI IAP =40OPSI OAP =492 PSI PVT =424 BBLS LAND BUILD SECTION LOST 11 BBLS 02:40 - 02:50 0.17 DRILL P PROD? PERFORM 10 MIN DYNAMIC FLOW CHECK. 0.80 BPM IN / 0.74 BPM OUT PULLING AT 8' / MIN GOOD DYNAMIC FLOW CHECK Printed 3282016 10:21:39AM North America - ALASKA- BP Page 8 of 18 Operation Summary Report Common Wall Name: 16-15 AFE No Event Type: RE -ENTER -ONSHORE (RON) Start Date: 2/18/2016 End Date: 2/27/2016 X3 -017H9 -C: (2,588,122.001 Project: Prudhoe Bay Site: PB DS 16 Rig Name/No.: NORDIC 2 Spud DateRme: 11/25/1985 12:00:OOAM Rig Release: 2/28/2016 Rig Contractor. NORDIC CALISTA UWI: 500292147400 Active datum: orkb @70.00usft (above Mean Sea Level) Date From - To Him Task Code NPT NPT Depth Phase Description of Operations (hr) usft 02:50 - 03:15 0.42 DRILL P PROD? PULL OUT OF HOLE FOR LATERAL BHA 2.89 BPM IN 12.76 BPM 9.50 PPG IN 19.45 PPG OUT PULL TO WINDOW OPEN EDC. JET CASING SLOWLY WITH 10 BELS HIVIS UP TO TUBING TAIL. 03:15 - 05:50 2.58 DRILL P PROD1 4.14 BPM IN / 3.60 BPM OUT 9.54 PPG IN 19.44 PPG OUT PULLED 40'/MIN FOR FIRST 1000' CONTINUE OUT OF HOLE 05:50 - 06:30 0.67 DRILL P PROD1 PERFORM 10 MIN FLOW CHECK CLOSE EDC/POWER TOOL DOWN - PJSM ON LAYING DOWN AND CHANGING OUT MOTOR BEND - POP OFF WITH INJECTOR AT 0630 06:30 - 07:45 1.25 DRILL P PROD1 LAY DOWN BUILD SECTION BHA. BIT GRADE 1 -1 -NO. CHANGE OUT MOTOR BEND TO 1.7° BEND, MU RERUN HYCALOG 3.75" X 4.25" BIT ONTO BHI SMARTTOOLS WITH RESISTIVITY. 07:45 - 12:30 4.75 DRILL P PROD? STAB ON WITH INJECTOR, PRESSURE TEST QUICK TEST SUB TO LOW OF 250 PSI WHILE EDC IS BEING CLOSED, COUNTERS ZEROED. - BREAK CIRCULATION, IMMEDIATE RETURNS. WELL STATIC. - RIH WITH BHA, PRESSURE TEST QUICK TEST SUB TO HIGH OF 3500 PSI WHILE RIH. -LOG TIE-IN WITH -6' CORRECTION - CONTINUE TO MOVE DOWN, LOG MAD PASS FOR GEO AND MWD 12:30 - 18:00 5.50 DRILL P PROD? ON BOTTOM AT 11,273'. INITIAL FREE SPIN OF 2990 PSI AT 2.82 BPM. DRILL AHEAD DIRECTIONALLY. - INITIAL IA PRESSURE OF 0 PSI, OA PRESSURE OF 175 PSI - MW IN 9.51 PPG, MW OUT 9.47 PPG, 1 FOR 1 RETURNS DURING INITIAL DRILLING - DRILLED AT 2.81-2.86 BPM, 3220-3700 PSI, WOB 1-2.7K - MW INCREASED TO 9.53 PPG IN, 9.48 PPG OUT, ECD ROSE FROM 10.65 PPG TO 10.78 PPG - BEGAN SEEING SLIGHT LOSSES TO FORMATION AT 11,420- - IA PRESSURE ROSE TO 415 PSI, OA ROSE TO $20 PSI 18:00 - 20:15 2.25 DRILL P PROD? CONTINUE DRILLING AHEAD IN LATERAL SECTION FREE SPIN =2990 PSI AT 2.80 BPM RATEIN=2.81BPM RATEOUT=2.80BPM MWIN=9.51PPG MWOUT=9.47PPG ECD = 10.80 PPG ROP = 60-100 FPH WOB = 0 -SK CIRC PSI = 2750- 3400 PSI IAP =477PSI CAP =593 PSI PVT =400 BBL DRILLING AHEAD AVERAGING 13' DOGLEGS. STARTING TO FALL BEHIND DIRECTIONALLY. DECISION TO PULL TO INCREASE MOTOR BEND Printed 3/28/2016 10:21:39AM North America - ALASKA - BP Page 9 of 18 Operation Summary Report Common Wall Name: 16-15 AFE No Event Type: RE -ENTER -ONSHORE (RON) Start Date: 21182016 End Date: 2/27/2016 X3 -017H9 -C: (2,588,122.00 ) Project: Prudhoe Bay Site: PB DS 16 Rig Name/No.: NORDIC 2 Spud Date/fine: 1125/1985 12:00:OOAM Rig Release: 228/2016 Rig Contractor: NORDIC CALISTA UWI: 500292147400 Active datum: orkb @70.00uslt (above Mean Sea Level) Date Fmm-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usl 20:15 - 20:35 0.33 DRILL P PROD? PERFORMED DYNAMIC FLOW CHECK 0.60 BPM IN / 0.54 BPM OUT 9.47 PPG IN / 9.48 PPG OUT GOOD FLOW CHECK 20:35 - 23:30 2.92 DRILL P PROD1 WIPER TO WINDOW OPEN EDC, INCREASE RATE TO BPM. PULL 407 MIN FOR 1,000' ABOVE WINDOW PJSM WITH NEW CREW MEMBERS AT 2500' FOR SWAPPING BHA'S 23:30 - 23:40 0.17 DRILL P PROD? PERFORM 10 MIN FLOW CHECK. WELLSTATIC. PULLTOSURFACE 23:40 - 00:00 0.33 DRILL P PRODI LAY DOWN BHI MOTOR TO REBEND. BIT GRADE 1 -1 -NO 223/2016 00:00 - 01:00 1.00 DRILL P PRODI LAY DOWN BHI MOTOR. INCREASE BEND FROM 1.7° TO 2.0° AKO. RERUN SAME BIT. MAKEUP BHA #5 AND STAB INJECTOR. PT OTS LOW/ HIGH WHILE POWERING UP TOOLS AND OPENING EDC 01:00 - 03:10 2.17 DRILL P PROW RIH WITH BHA#5 0.65 BPM IN 11.18 BPM OUT RIH SPEED -1007MIN 9.45 PPG IN / 9.48 PPG OUT IA / OA= 100# / 437# 03:10 - 03:30 0.33 DRILL P PRODI LOG FORMATION TIE IN -8.5' CORRECTION 03:30 - 04:00 0.50 DRILL P PROD? CLOSE EDC. RUN THROUGH WINDOW. 0.74 BPM IN / 0.87 BPM OUT 9.47 PPG IN 19.47 PPG OUT RUN THROUGH EXPOSED SHALES. WEIGHT BOBBLE / MOTOR WORK AT -11050' 04:00 - 09:00 5.00 DRILL P PROD? BACK ON BOTTOM WITH BHA FREE SPIN OF 3020 PSI AT 2.84 BPM. DRILL AHEAD IN LATERAL FROM 11,600'. - DRILLAHEADAT 2.85 BPM, 3250 PSI, 2-2.7K WOB - MW IN 9.51 PPG, MW OUT 9.48 PPG, ECD OF 10.8 PPG - SIGNIFICANT LOSSES BEGAN AT 11,849'. FOLLOW WELL PLAN FOR LOSS MANAGEMENT, LINE UP AND PUMP ACROSS TOP TO ENSURE HOLE FILL, FULL PITS AND FLUID IN TRUCK ON LOCATION AND TRUCK BEING FILLED AT MUD PLANT. 09:00 - 10:45 1.75 DRILL P PROW DRILLAHEAD WITH JUST UNDER FULL LOSSES. CLEAR INDICATION ON LOGGING OF FORMATION BREAK AT 11,849'. - DRILLAT 2.80 BPM, PUMP ACROSS TOP AT .58 BPM, RETURNS OF .65 BPM. RAPID ROP AT 130 FPH. - FILL ACROSS TOP, ORDER OUT ADDITIONAL TRUCKING. DRILL TO 12,000', CALCULATE FLUID ON LOCATION AND DECIDE TO CONDUCT WIPER TO WINDOW UNTIL SECOND TRUCKARRIVES ON LOCATION. Printed 3/28/2016 10:21:39AM North America - ALASKA - BP Page 10 or 18 Operation Summary Report Common Well Name: 16-15 APE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/18/2016 End Date: 227/2016 X3-017H9-C: (2,588,122.00) Project Prudhoe Bay Site: PB DS 16 Rip Name/No.: NORDIC 2 Spud DateRme: 1125/1985 12:00:00AM Rig Release: 2282016 Rig Contractor. NORDIC CALISTA UWI: 500292147400 Active datum: orkb @70.00us(t (above Mean Sea Level) Date From -To Him Task Code NPT NPT Depth Phase Desorption of Operations hr usB 10:45 - 11:00 0.25 DRILL P PROD? PICK UP OFF BOTTOM CLEAN, PICK UP WEIGHT ON TRIP TO WINDOW 47-50K. MAINTAINING 2.80 BPM TO CLEAN UP HOLE AND PUMPING ACROSS TOP AT.6 BPM WITH A RETURN RATE OF.85 BPM. - REDUCE RATE TO 1.95 BPM, 1650 PSI, AND PUMP ACROSS TOP AT.60 BPM WITH RETURN RATE OF .72 BPM 11:00 - 17:30 6.50 DRILL N DPRB 12,000.00 PRODI ABOVE WINDOW. OPEN EDC. -REDUCE RATE TO 0.53 BPM DOWN COIL AND 0.92 BPM ACROSS THE TOP WITH RETURNS OF 0.57 BPM. -DYNAMIC LOSS RATE AT WINDOW 0.89 BPM / 54 BPH -CONTINUE TO WAIT ON TRUCKING 17:30 - 20:00 2.50 DRILL P 12,000.00 PROD? CLOSE EDC. TIE-IN DEPTH FROM 10860 FT. CORRECT -5 FT. TAG BOTTOM AND DRILL FROM 12,003 FT. INITIAL ROP IS 100 FT/HR VAT 2-3K DWOB. DRILLAT 2.86 BPM + 0.42 BPM KILL LINE, GETTING 0.55 BPM BACK. DRILL TO 12,135 FT. 20:00 - 22:30 2.50 DRILL P 12,000.00 PROD? PICK UP FROM 12,135 FT FOR BHA WIPER. -CLEAN PICKUP AROUND 50K. -CONTINUE DRILLING FROM 12,135 FT WITH ROP 100-120 FT/HR. -LOSSES INCREASING. ECD FALLING AWAY. INCREASE TOP HOLE FILL TO 0.6 BPM. LOSSES AT 3.5 BPM -WIPER UP ACROSS LOSS ZONES. MINOR OVERPULLSAND MOTOR WORK CONTINUE WIPER TO WINDOW. 22:30 - 23:00 0.50 DRILL P 12,000.00 PROD1 STARTED PULLING HEAVY AT 10900'- MOTOR WORKAND OUT RATE INCREASED. STARTED PACKING OFF. FIN TO FLUFF CUTTINGS. PULL BACK UP HOLE. THROUGH WINDOW WITH NO ISSUE. 23:00 - 00:00 1.00 DRILL P 12,000.00 PROD1 DROP RATE DOWN COIL. PUMP ONLY SPORADICALLY TO KEEP PIPE WARM PUSH LOSSES DOWN BACKSIDE TO FLUSH REMAINING CUTTINGS IN T' INTO FORMATION AT 2.2 BPM. 2/242016 00:00 - 01:30 1.50 DRILL P PROD1 LOG TIE IN+4.5 RUN BACK TO BOTTOM 01:30 - 04:00 2.50 DRILL P PROD? TAG EARLY AT 12,200' FRACTURE ZONE. PICKUP AND SPIN BIT GET BACK TO BOTTOM. TAG AT 12262'. DRILLAHEAD WITH MULTIPLE WIPERS. DRILLED AHEAD WHILE AVERAGING -150'/HR LOSING 2.86 BPM DOWN COIL+ 0.60 BPM DOWN BACKSIDE. ECD AVERAGING 8.99 PPG OR 4070# MUD WEIGHT IN 9.44 PPG Printed 3/28/2016 10:21:39AM North America - ALASKA - BP Page 11 of 16 Operation Summary Report Common Wall Name: 16-15 APE No X3 -017119-C: (2,588,122.00 ) Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/182016 End Date: 2272016 Project Prudhoe Bay Site: PB DS 16 Rig Name/No.: NORDIC 2 Spud Daternme: 1125/1985 12:00:00AM Rig Release: 2282016 Rig Contractor: NORDIC CALISTA UW: 500292147400 Active datum: orkb @70.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations hr) (usft) 04:00 - 05:00 1.00 DRILL P PROD? PUMP 10 BELS HI VIS SWEEP START WIPER UP THTOUGH THIEF AT 12,200' -AND 10,850'- OVERPULLING /MOTOR WORK INCREASING. WORK AREA UP AND DOWN TO SWEEP CUTTINGS TO THIEF ZONES. GEOLOGY MAPPED FRACTURES AT 11849', 11912',1208 12230' 05:00 - 07:20 2.33 DRILL P PRODI DRILLING AHEAD IN 2200# AT 2.88 BPM PUMPING 0.38 BPM DOWN BACKSIDE TO KEEP HOLE FULL 9.44 PPG IN / 9.38 PPG DWOB 4.5K. 42N SHALE CAME IN EARLY. AT 12,590 FT PUMP 10 BBLS HI -VIS SWEEP, PREP FOR WIPER TRIP BACK TO WINDOW. DRILL TO 12,600 FT. 07:20 - 09:30 2.17 DRILL P PROW LONG WIPER TRIP BACK TO WINDOW. TIE-IN DEPTH, CORRECT+7 FT, NO ISSUES SEEN AT WINDOW OR OTHER SHALE ZONES GOING UP. RUN IN WITH REDUCED PUMP RATE, SETDOWNS AT 10990 FT, 11040 FT, 11100 FT, 12225 FT GOING DOWN. 09:30 - 11:00 1.50 DRILL P PROD? DRILL FROM 12,600 FT TO TD OF 12,710 FT. HAVE REACHED DIRECTIONAL OBJECTIVES FOR THE WELL, HOWEVER SOR OBJECTIVES HAVE NOT BEEN ACHIEVED. 11:00 13:30 2.50 DRILL C PROD? CLEAN AND CONDITION HOLE FOR EITHER BILLET OR RUNNING LINER. DISCUSS WITH ANC ODE ABOUT SETTING BILLET. PULL BACK TO WINDOW AND TIE-IN DEPTH, CORRECT -5 FT. RUN BACK TO BOTTOM. SET DOWN AT 12,225 FT, PICK UP AND BOUNCE THROUGH. TAG BOTTOM AT 12,710 FT, CORRECTED DRILLED DEPTH. 13:30 - 16:10 2.67 DRILL C PROD? PULL BACK TO WINDOW FOR 2ND WIPER TRIP. SEE ONLY SLIGHT WEIGHT BOBBLES THROUGH SHALE ZONES. AT WINDOW, RUN BACK IN WITH REDUCED PUMP RATE THROUGH BUILD SECTION. MINOR SET DOWNS AT 11030 FT, 11240 FT. 16:10 - 20:05 3.92 DRILL C PROD1 POOH LAY IN ALPINE BEAD PILL. OVERPULL AT 12,190 FT THEN CLEAN TO WINDOW. PULL THROUGH WINDOW AND OPEN EDC. JET WHIPSTOCK TRAY WITH OPEN EDC. JET 7" CASING. FLAG PIPE AT 10,288 FT EOP. Printed 3/26/2016 10:21'.39AM North America - ALASKA - BP Page 12 of 18 Operation Summary Report Common Well Name: 16-15 AFE No X3.017H9-C: (2,588,122.00 ) Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/18/2016 End Date: 2/27/2016 Project Prudhoe Bay Site: PB DS 16 Rig Name/No.: NORDIC 2 Spud DateRme: 11/25/1985 12:00:OOAM Rig Release: 2/28/2016 Rig Contractor NORDIC CALISTA UWI: 500292147400 Active datum: orkb @70.00usft (above Mean Sea Level) Data From -To Hm Task Code NPT NPT Depth Phase Description of Operations hr usR 20:05 - 00:00 3.92 DRILL C PROD? ESTABLISH LOSS RATE ACROSS THE TOP 4.1 BPM LOSS RATE. PJSM TO DISCUSS POWER ASSIGNMENTS WHILE UTILIZING BOTH PUMPS. -ESTABLISHED STABLE HOLE FILL. BREAK OFF INJECTOR, LAY DOWN BHA BIT GRADED 3-1-ST -INSTALL NIGHTCAP. CIRCULATEACROSS THE TOP, MAINTAINING HOLE FILL. -PERFORM CHROME MANAGEMENT. CUT 100' OF COILAND REHEAD. TESTED E-LINE. -PULL TEST CTC 38K, PTCOILCONNECTOR 3DO/ 3800. -INSTALL UOC WITH FLOATS. PRESSURE TESTING FLOATS AT REPORT TIME, 2/25/2016 00:00 - 00:30 0.50 DRILL C PRODt FLOATS PASSED LOW / HIGH CHARTED TEST. 00:30 - 01:00 0.50 DRILL X DPRB PROD1 PJSM, MAKE UP BHA#5. STAB ON WITH INJECTOR RIH TO 100'. OPEN EDC. SET PUMP TRIP AT 1000# START CIRCULATING DOWN COIL. 1.30 BPM / 1.50 BPM IN 0.75 BPM OUT 9.45 PPG IN / 9.38 PPG OUT DI:00 - 03:00 2.00 DRILL X DPRB PROD1 RIH START 140' DEG 1% KCL DOWN COIL 03:00 - 03:05 0.08 DRILL X DPRB PROD? LOG TIE IN WITH -8' CORRECTION 03:05 - 05:00 1.92 DRILL X DPRB PROD1 RIH 7O 10800', JUST ABOVE WHIPSTOCK 50K PICKUP WEIGHT. PUMP 140° 1%KCL INTO OPEN HOLE. PUMP 170 BBLS 0.82 BPM (9.5 MUD) FILLING FROM TOP. 1.60 BPM (8.3 1% KCL) GOING DOWN COIL TOTAL LOSS RATE AT WINDOW 2.41 BPM AT WINDOW ANNULAR PRESSURE: 4050#, BORE PRESSURE: 4059# 05:00 06:00 1.00 DRILL X DPRB PROD? SPOT 16 BBLS 9.5 MUD OVER GOOSENECK. COME OFFLINE WITH COIL PUMP. CLOSE EDC. MAKEUP HOLE FILL PUMPING ACROSS THE TOP. MAINTAIN HOLE FILL DOWN BACKSIDE WHILE RIH TO SET DEPTH. LOSSES 2.22 BPM IN / 0.25 BPM OUT. LOSSES 2.0 BPM RIH WEIGHT 27K 06:00 - 06:40 0.67 DHB X DPRB PRODI RIH WEIGHT 25K PU WEIGHT 48K RIH TO 11784.45' PU TO 40K LOSS RATE AT SET DEPTH 1.5 BPM ANNULAR 4031#/ BORE 4031# INCREASE PRESSURE TO CIRC PRESSURE TO 1018# ANNULAR 4282#/4937# 646# DIFFERENTIAL. IMMEDIATELY GET 1:1 RETURNS ACROSS TOP. WAIT FOR RETAINER ELEMENTS TO INFLATE. Printed 3/28/2016 10:21:39AM North America - ALASKA - BP Page 13 or 16 Operation Summary Report Common Well Name: 16-15 AFE No Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/18/2016 End Date: 2/27/2016 X3-0171-9-C: (2,588,122.00) Project: Prudhoe Bay Site: PB DS 16 Rig Name/No.: NORDIC 2 Spud Datemme: 11/25/1985 12:00:OOAM Rig Release: 2/28/2016 Rig Contractor. NORDIC CALISTA UW'. 500292147400 Active datum: orkb @70.00usft (above Mean Sea Level) Date From -To Hm Task Code NPT NPT Depth Phase Description of Operations (hr) usft 06:40 - 07:30 0.83 DHB X DPRB PROD? INCREASE CT PRESSURE TO 1500 PSI. RIH SET 3K DOWN. PRESSURE UP TO 2000 PSI CT PRESSURE, BALL SEAT SHEARS OUT. PICK UP TO 60K TO UNSTING FROM RETAINER, PICK UP ANOTHER 20 FT ABOVE RETAINER. INCREASE PUMP RATE DOWN CT TO 2.5 BPM WITH 2.34 BPM RETURNS. REDUCE RATE BACK TO 1 BPM AND POOH. DYNAMIC FLOW CHECK IS GOOD WHILE POOH. 07:30 - 09:40 2.17 DHB X DPRB PROD1 JET WHIPSTOCK TRAY WITH OPEN EDC. POOH. 09:40 - 10:30 0.83 DHB X DPRB PROD? CONDUCT PJSM FOR CHANGING OUT BHA WHILE POOH. TRIP SHEET IS-5 BBLS TO THIS POINT. 10 MIN PUMPS OFF FLOWCHECKAT SURFACE IS GOOD, NO FLOW. TAG STRIPPER AND L/D RUNNING TOOLS. ALL TOOLS HAVE FUNCTIONED NORMALLY. INJECTOR OFF AT 10:00. WHILE L/D TOOLS CONDUCT KICK WHILE TRIPPING DRILL WITH ELLINGTON CREW. BOP HORN IS SOUNDED JUSTAFTER REMOVING INJECTOR. CREW PULLS INJECTOR TO SIDE, INSTALLS AND TORQUES LIFTER AND REMOVES BHA FROM STACK SIMULATE SHUTTING IN WELL, DRILLER CLOSES IN AS PER STANDING ORDERS. DRILL IS ENDED AT THIS POINT, BRIEF AAR ON RIG FLOOR. 10:30 - 10:50 0.33 BOPSUR P PROD? FUNCTION TEST BOPS FROM DRILLER'S STATION, 10:50 - 14:00 3.17 DRILL C PROD? M/U BHA #7. BILLET. M/U INJECTOR, ON AT 11:05. TEST QTS, TEST BHI, OPEN EDC, ZERO COUNTERS, RIH. PUMP 0.6 BPM /600 PSI THROUGH OPEN EDC. 14:00 - 15:10 1.17 DRILL C PROD? LOG TIE-IN FROM 10660 FT, CORRECT i8 FT. RIH TO WINDOWAND CLOSE EDC. PASS THROUGH WINDOW, RIH. MINOR SETDOWN AT 11,100 FT OTHERWISE CLEAN PASS TO SETTING DEPTH. STOP AT 11,662.1 FT LEAVES BILLET TOP AT 11,650 FTAT 129R. PRESSURE UP TO SET BILLET, SHEARS AT 4100 PSI. 15:10 - 18:00 2.83 DRILL C PROD1 DYNAMIC FLOW CHECK JUST OFF BOTTOM IS GOOD, 0.53 / 0.49 BPM AT 2 FT/MIN. PULL THROUGH WMNDOWAND POOH. AFTER PULL THROUGH WINDOW CONDUCT RIG EVAC EXERCISE WITH ELLINGTON CREW AND AAR AFTER. CONTINUE POOH. AT SURFACE, 10 MIN FLOWCHECK IS GOOD, NO FLOW. Punted 3/28/2018 1021'39AM North America - ALASKA - BP Page 14 of 18 Operation Summary Report Common Well Name: 16-15 AFE No Event Type: RE-ENTER- ONSHORE IRON) Start Data: 2/18/2016 End Date: 2/27/2016 X3-017119-C: (2,588,122.00 ) Project: Pmdhoe Bay Site: PB DS 16 Rig Name/No.: NORDIC 2 Spud DateRme: 1125/1985 12:00:00AM Rig Release: 2/28/2016 Rig Contractor: NORDIC CALISTA UWI: 500292147400 Active daWm: orkb (ID70.00usft (above Mean Sea Level) Date From -To Has Task Code NPT NPT Depth Phase Description of Operations (hr) usft 18:00 - 20:00 2.00 DRILL C PROD? CREW CHANGE. PJSM FOR MOVING INJECTOR /SWAPPING BHA'S INJECTOR OFF 18:50. LAY DOWN BILLET SETTING TOOLS. MAKE UP BHA #8 INJECTOR ON 20:00 20:00 - 00:00 4.00 DRILL C PROD1 RIH -PERFORM H2S RIG EVACUATION DRILL -LOG TIE IN WITH -7' CORRECTION -CLOSE EDC AND RUN TO BOTTOM 2/262016 00:00 - 03:30 3.50 DRILL C PRODI RECORD PARAMETERS. DRYTAG BILLETAT 11651.7' 2.83 BPM AT 3075# FREE SPIN. 2.83 BPM IN / 2.83 BPM OUT 9.52 PPG IN / 9.45 PPG OUT PU WEIGHT 47K / RIH WEIGHT 20K FIRST SIGN OF MOTOR WORK / WOB AT 11650.4' TIME MILL PER BHI REP. 03:30 - 06:00 2.50 DRILL C PROD? NEAR BIT DROPPING ANGLE. GOOD DEPARTURE OFF BILLET 3050# AT 2.84 BPM FREE SPIN 2.84 BPM IN / 2.84 BPM OUT 9.51 PPG IN 19.46 PPG OUT MOTOR WORK AVERAGE BETWEEN 200-500# ROP INCREASING AS WE GET MORE DEPARTURE FROM BILLET. DWOB 1.2.5K D6:00 - 07:00 1.00 DRILL C PRODI DRILLED TO 11778'. GETTING CLEAN SURVEYS 17 DEG. PICK UP WHILE DD CALCULATES FUTURE TRAJECTORY, TO DECIDE IF MORE MOTOR BEND IS NEEDED. DISCUSS NTH ODE AND GEO, DECIDE TO DRILL ANOTHER 22 FT TO CONFIRM DLS. 07:00 - 10:20 3.33 DRILL C PROD? DRILL FROM 11,780 FT. DLS IS AVERAGING 19 DEG/100 FOR LAST 3 SURVEYS. AT 11847 FT STALLAND PICK UP, START LOSING FLUID. MAKE NOTIFICATIONS, CONTINUE DRILLING. FLUIDS SUPPORTALREADY ON LOCATION. PUMP 10 BBLS HI-VISAROUND AT 11920 FT. DRILLING NTH GOOD ROP AT 2.8 / 0.64 BPM DRILL TO 11950 FT 10:20 - 12:20 2,00 DRILL C PRODI WIPER TRIP FROM 11950 FT TO WINDOW. REDUCE RATE PULL ACROSS BILLET NO ISSUES. TIE-IN DEPTH, CORRECT+6 FT. CONTINUE WIPER TRIP TO BOTTOM. REDUCE PUMP RATE IN BUILD SECTION. SET DOWN 2 TIMES IN SHALE AT 11,100 FT. 12:20 - 16:20 4.00 DRILL C PRODI DRILL FROM 11,950 FT. ROP IS 60 -90 FT/HR WITH 2-4K DWOB. HOLD 90L TF FOR NOW TO CONTINUE LONG LH TURN AND STAY IN POLYGON. 2.89/1.42 BPM IN/ OUT 9.56/ 9.56 PPG. AT 12,100 FT PUMPANOTHER ID BBLS HI-VIS SWEEPAROUND. AFTER 12,180 FT ROP SLOWS WITH WEIGHT STACKING. DRILL TO 12,186 FT. Printed 3282016 10:21:39AM North America - ALASKA - BP Page 15 of 18 Operation Summary Report Common Well Name: 16-15 AFE No X3 -017H9 -C: (2,588,122.00) Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/18/2016 End Date: 227/2016 Project: Prudhoe Bay Site: PB DS 16 Rig Name/No.: NORDIC 2 Spud DateRme: 1125/1985 12:00:OOAM Rip Release: 2/28/2016 Rig Contractor. NORDIC CALISTA UN: 500292147400 Active datum: orirb @70.00usft (above Mean Sea Level) Date From - To Hrs Task Code NPT NPT Depth Phase Description of Operations hr waft) 16:20 - 18:00 1.67 DRILL C PROD1 PULL WIPER TRIP TO WINDOW. REDUCE PUMP RATE ACROSS BILLET, NO ISSUES. PULL TO WINDOW AND TURN AROUND, REDUCE PUMP RATE DOWN THROUGH BUILD SECTION. STACK WEIGHTAT 10985 FT, 11040 FT, 11100 FT, 11240 FT, 11270 FT 18:00 - 19:50 1.83 DRILL C PROD1 DRILL FROM 12,180 FT TO 12228' 2.93 /1.14 BPM, 9.57 19.55 PPG. INITIAL ROP IS AROUND 60 FT/HR NTH 2-3K DWOB. PERFORM SHORT WIPERS. DISCUSS NTH GEOLOGY 19:50 - 00:00 4.17 DRILL C PROD? WEATHER WENT PHASE II. DISCUSS NTH CH2 TRUCK PUSHER/SUPERINTENDENT PRIOR TO CUTTING LAST HIGH LOSS FAULT WIPER UP TO ACROSS FAULT ZONE / BILLET / WINDOW TIE IN / DROP RATE TO MITIGATE LOSSES TO 1 BPM 160 BPH TRUCKS HAVE CONVOY NOW. PUT ANOTHER TRUCK ON. DISCUSS NTH TRUCK PUSHER AND DISPATCH. PUT 2 PICKUPS ON TO CONVOY TRUCKS. ROADS AND PADS CLEARING MAIN ROAD. DISCUSSED WITH CH2 DISPATCH. CH2 NOT TAKING ICE ROAD DUE TO DECREASE VISIBILITY. FLUIDS GETTING CAUGHT UP LOG TIE IN +11 227/2018 00:00 - 01:00 1.00 DRILL C PROD? CAUGHT UP NTH NTH FLUID SUPPORT. 01:00 - 02:10 1.17 DRILL C PROD? CLOSE EDC, RIH TO BOTTOM 9.51 PPG IN / 9.47 PPG OUT PUMP MINIMUM RATE THROUGH SHALES. SAT DOWN AT 11,050', 11,105', 11,250' 0210 - 0315 1.08 DRILL C PRODi DRILL LATERAL SECTION 12236' TO 12332' FREE SPIN = 3075PSI AT 2.85 BPM RATEIN=2.85BPM RATEOUT=0.94BPM (LOSSES 115 BPH) MWIN=9.56PPG MWOUT=9.SOPPG ECD = 10.57 PPG MWTEMPIN=93.3DEG MWTEMPOUT=82.5 DEG BHT= 126 DEG ROP=FPH WOB=2-4K CIRC PSI =3530 PSI IAP =O PSI OAP =O PSI PVT =2161211 BBLS LOSSES GRADUALLY GETTING WORSE AS WE DRILL AHEAD. STARTED NTH 1158BLS /HR, NOW UP TO 140 BBLS / HR GEOLOGY CONFIRMED FRACTURES AT 11847', 11952', 12080', 12140', 12245' Printed 3282016 10:21:39AM North America - ALASKA - BP Page 16 of 18 Operation Summary Report Common Well Name: 16-15 APE No X3-017H9-C: (2,588,122.00) Event Type: RE-ENTER- ONSHORE (RON) Start Date: 2/182016 End Date: 2/27/2016 Project: Prudhoe Bay Site: PB DS 16 Rig Name/No.: NORDIC 2 Spud DateRme: 1125/1985 12*00:00AM Rig Release: 2/282016 Rig Contractor: NORDIC CALISTA UWI: 500292147400 AcBve datum: arkb 070.00usR (above Mean Sea Level) Date From -To Hm Task Code NPT NPT Depth Phase Descnplion of Operations hr ustt 03:15 - 05:30 2.25 DRILL C PROD1 DRILL LATERAL SECTION 12332' TO 12408' FREE SPIN = 3075PSI AT 2.85 BPM RATE IN=2.85 BPM RATE OUT =0.51 BPM (LOSSES 156 BPH) MW IN=9.52 PPG MW OUT =9.47 PPG ECD = 10.34 PPG MWTEMP IN= 99.7 DEG MWTEMP OUT= 89.7 DEG BHT=122DEG WOB = 1.8.2.0 K CIRC PSI = 3530 PSI IAP = 0 PSI OAP = 0 PSI 0530 - 0630 1.00 DRILL C PROD1 DRILL LATERAL SECTION 12408'-12430' FREE SPIN = 2875PSI AT 2.85 BPM RATEIN=2.85BPM RATEOUT=0.30BPM (LOSSES 157 BPH) MWIN=9.56PPG MWOUT=9.50PPG ECD = 10.46 PPG MWTEMP IN= 88.1 DEG MWTEMP OUT= 82.6 DEG BHT- 124 DEG WOB = 24 K CIRC PSI = 3069 PSI IAP = 0 PSI OAP = 0 PSI DISCUSS WITH GEOLOGY WHAT WE ARE SEEING. CONTINUE WITH PLAN DRILL TO 12480 FT. 06:30 - 09:00 2.50 DRILL C PROD? CONTINUE DRILLING FROM 12,480 FT. LOW ROP DRILLING WITH NEGATIVE 1OK-14K STRING WT. DRILL AT 175L TF TO TRY AND REDUCE INCLINATION AS QUICKLYAS POSSIBLE. AT 12,540 FT PUMP 10 BBLS LO / HI VIS SWEEPS, PULL 150 FT WIPER TRIP. DRILL TO 12,570 FT. 09:00 - 09:50 0.83 DRILL C PROD? CONTINUE DRILLING WITH LOW ROP FROM 12,570 FT. CONDUCT FREQUENT SHORT WIPER TRIPS. WHILE DRILLING CONDICT KICK WHILE DRILLING EXERCISE WITH ELLINGTON CREW. DRILLER NOTICED INCREASED OUT FLOW, ASKS FOR FLOW CHECK. FLOW CHECK SHOWS WELL FLOW (SIMULATED) WELL IS SHUT IN AS PER STANDING ORDERS. DRILL IS ENDED AT THIS POINT, HOLD AAR. DRILL TO 12,600 FT. 09:50 - 11:40 1.83 DRILL C PROD? LONG WIPER TO WINDOWAND TIE-IN DEPTH. START DRAGGING ABOUT 5-7K FROM 11790 FT. RUN BACK IN AND PULL THROUGH AGAIN. PULLING HEAVY AGAIN AT 11750, RUN BACK IN. PUMP 12 BBLS HI-VIS PILLAROUND, CONTINUE CYCLING PIPE WORKING BACK UP TO WINDOW. DRAGGING AT 11715 FT, RUN BACK IN. DRAGGING AGAIN AT 11670 FT, RUN BACK IN. PULL PAST BILLET STILL DRAGGING, SLOW DOWN PULLING SPEED INCREASE PUMP. CONTINUE WIPER TRIP, MINOR OVERPULLS SEEN AT BUILD SECTION SHALES. Printed 328/2016 10:21:39AM North America - ALASKA- BP Page 17 of 16 Operation Summary Report Common Well Name: 16-15 AFE No X3-017H9-C: (2,588,122.00 ) Event Type: RE-ENTER- ONSHORE (RON) StartDate: 2/18/2016 End Date: 2/272016 Project: Prudhoe Bey Site: PB DS 16 Rig Name/No.: NORDIC 2 Spud DateRme: 1125/1985 12:00:OOAM Rig Release: 2282016 Rig Contractor NORDIC CALISTA UW1: 500292147400 Active datum: orkb ®70.00usft (above Mean Sea Level) Date From- To Hm Task Code NPT NPT Depth Phase Description of Operations hr (usft 11:40 - 14:00 2.33 DRILL C PROD? PULL THROUGH WINDOWAND OPEN EDC. JET T' CASING AT 3.01 / 0.57 BPM. LOG TIE-IN, CORRECT+14 FT. RIH, 0.5 BPM THROUGH BUILD SECTION. STACK WT AT 11040 FT, 11100 (7 TIMES). CAN'T PASS THIS SPOT TRY VARIOUS RUNNING SPEEDS AND PUMP RATES, AS DRILLED TF. PICK UP AND BUILD SPACER FOR PUMPING MINERAL OIL. WHILE WAITING, TRY 2 MORE TIMES TO WORK PAST, NO LUCK. PINCH IN CHOKE, PUMP DOWN KILL LINE GET 500 PSI WHP. TRY TO PASS 2 MORE TIMES, AS DRILLED TF, 0.3 BPM DOWN CT, NO LUCK. 14:00 - 14:45 0.75 DRILL C PROD? DISCUSS PLAN FORWARD WITH CTD SI AND ODE. PJSM THEN PUMP MINERAL OIL DOWN CT TO TRV AND PASS SHALE AT 11,100 FT. PUMP 15 BBLS KCL, 10 BELS OIL, 15 BELS KCL. RIH STACK WT 11100 FT. PICK UP AND PUMP 2 BBLS OIL OUT. RIH TRY TO PASS 2 MORE TIMES 60 FTIMIN AND 30 FT/MIN, AS DRILLED TF NO LUCK PUMP 6 MORE SBLS OUT, RIH AND TRY 2 MORE TIMES TO PASS AT AS DRILLED TF AND OL TF. PUMP 2 MORE BBLS OUT, RIH AT OL TF 2 MORE TIMES, NO LUCK. 14:45 - 15:30 0.75 DRILL C PROD1 PICK UP AND GO TO DRILLING PUMP RATE. EASE DOWN TO 11,100 FTAT AS DRILLED TF. STALL MOTOR TWICE, FINALLY PUSH THROUGH. PICK BACK UP THROUGH, TRY TO PASS AGAIN 2 TIMES CAN'T PASS AT FULL RATE OR AT REDUCED RATE. EASE DOWN, STALL EACH TIME. STALL TIMES AT 11,100 FT NOTABLE TO PASS. STALLS GETTING PROGRESSIVELY SHALLOWER. 15:30 - 17:00 1.50 DRILL C PROD1 DISCUSS WITH ODE, DECIDE TO SETA BILLET. CLEAN AND CONDITION WELLBORE DOWN TO BILLET SETTING DEPTH. PULL THROUGH WINDOWAND OPEN EDC, JET WHIPSTOCK TRAY. POOH. 17:00 - 19:05 2.08 DRILL P PROW WHILE POOH RECEIVE WORD FROM ODE TO RDMO. COST OF FURTHER OPERATIONS NOT JUSTIFIED BY ACCESSIBLE RESERVES CONTINUE OUT OF WELL. STOPAT200'. VERIFY LOSS RATE 1.7 BPM. TAG UP AND BLOW DOWN BHA. LAY DOWN. BIT GRADED 1-1-NO 19:05 - 22:30 3.42 DRILL P PROD1 OFFLOAD LINER WHILE WAITING ON 1% KCL / DIESEL Printed 3282016 10:21:39AM Printed 3/28/2016 10:21:39AM North America - ALASKA- BP Page 18 of 18 Operation Summary Report Common Well Name: 16-15 AFE No X3-017H9-C: (2,588,122.00 ) Event Type: RE-ENTER- ONSHORE (RON) Stan Date: 2/182016 End Date: 227/2016 Project: Prudhoe Bay Site: PB DS 16 Rig Name/No.: NORDIC 2 Spud Datelfnne: 1125/1985 12:00:OOAM Rig Release: 2/28/2016 Rig Contractor. NORDIC CALISTA UWI: 500292147400 Active datum: orkb @70.00usR (above Mean Sea Level) Date From -To Hm Task Code NPT NPT Depth Phase Description of Operations (hr) usft 22:30 - 00:00 1.50 DRILL P PRODI PJSM FOR SWAPPING WELL OVER TO KCL PER APPROVED OCN#4 REVIEW XCHECK. SET PARAMETERS FOR BULLHEADING KCL BULLHEAD 226 BBLS OF 1% KCL COME ONLINE 2.85 BPM ® 996# 3.09 BPM @ 1106# WITH 226 BBLS AWAY. Printed 3/28/2016 10:21:39AM North America - ALASKA- BP Page 1 of 1 Operation Summary Report Common Well Name: 16-15 AFE No X3 -017H9 -C: (1,744,878.00 ) Event Type: COM- ONSHORE (CON) Start Data: 2/28/2016 End Date: 2/28/2016 Project: Prudhoe Bay I Site: PB DS 16 Rig Name/No.: NORDIC 2 Spud DateTme: 11/25/1985 12:00:OOAM Rig Release: 2/28/2016 Rig Contractor. NORDIC CALISTA UWI: 500292147400 Active datum: odrb ®70.00usft (above Mean Sea Level) Dale From - To Hire Task Code NPT NPT Depth Phase Description of Operabons (hr) usft) 2/28/2016 0000 - 01:15 1.25 DEMOB C POST SWAP TO DIESEL. PUMP 38 BBLS DIESEL/3 BBLS METHANOL FOR TREE FINAL PRESSURE WAS 200#, FALLING. SHUT MASTER/SSV 01:15 - 04:15 3.00 DEMOB C POST PJSM WITH N2 PUMPERS. WSL WITNESSED PT/PRESSURE TEST SPEAR WITH 5 BBLS METHANOL COME ONLINE WITH NITROGEN AT 1800 SCF BYPASS OUT MM WHEN 2/3 REEL VOLUME OUT. LET NITROGEN BLEED DOWN. VALVE CREWARRIVED. GREASE SWAB/ SSV / MASTER. CLOSE ALL VALVES 04:15 - 06:00 1.75 DEMOB C POST VERIFY NITROGEN BLED OFF PICK INJECTOR OFF. BREAK DOWN BHA# 9 PUT INJECTOR ON LEGS. PERFORM LEAK TIGHT TEST. PREPARE TO NIPPLE DOWN BOPE 06:00 - 09:30 3.50 DEMOB C POST OPEN VBR DOORS AND INSPECT BOPS, NOTHING UNUSUAL SEEN. REPLACE VBR DOORS. REMOVE BOPS AND INSTALL TREE CAP. DUMP 1 BOTTLE HEET ON TOP OF SWAB. VISUAL LEAK TIGHT TEST ON TREE CAP, RESULTS NO LEAKS OBSERVED. — RELEASE RIG AT 09:30 "' ALL FURTHER INFORMATION ON 03-21 REPORT. Printed 3/28/2016 10:22:32AM C-21, Well History (Pre -Rig Sidetrack) T/I/O = 50/200NAC. Temp = SI. T & IA FL (E -LINE request). No AL. T FL @ surface. IA FL near 1/10/2016 surface. SV, SSV = C. WV = LOTO. MV = O. IA, OA = OTG. 14:35. INITIAL T/I/O = 50/260/0 PSI. RUN #1 -- RIH W/ 20'X 2.74" DUMMY WHIPSTOCK DRIFT. TAGGED EVOTRIEVE PLUG @ 9130' MD. RUN #2 -- RIH W/ BAKER 35 KB PACKER WHIPSTOCK -- SET TOW @ 8960' W/ ORIENTATION @ 5 DEG ROHS. DEPTH CORRECTED TO SLB JEWELRY LOG DATED 22 -AUG -2012. WELL LEFT SHUT IN UPON 1/11/2016 DEPARTURE - NOTIFIED PAD OP OF WELL STATUS. FINAL T/I/O = 0/260/0 PSI. SET WHIDDON IN XN-NIP @ 7,816' SLIM, 7,824' MD. LAY DOWN FOR SLB SAFETY STAND 1/12/2016 DOWN. T/1/0=0/227/0 MIT -T to 3000 PASSED pumped 1.7 bbls dsl to reach test pressure lost 169 and 60 1/12/2016 psi bled tbg back to 0 rig off tbg standby for slickline. PULLED ST #3 RK-DGLV FROM 5193' SLM, 5,196' MD. SET ST #3 RKP-FLOW SLV @ 5193' SLIM, 5,196' MD. CIRC IA TO TBG DOWN FLOWLINE (440 BBLS DIESEL). PULL ST #3 RKP- FLOW SLV FROM 5,193' SLM, 5,196' MD. SET RK-OGLV (20/64" ports) IN ST#3 @ 5,193' SLM, 5,196' MD. PULL ST#4 DGLV FROM 3,084' SLM, 3,092' MD. SET RK DOME -GLV (16/64" ports, 1,500# tro) IN ST#4 @ 3,084' SLM, 3,092' MD. PULL EMPTY WHIDDON FROM 7,816' SLM, 7,824' 1/13/2016 MD. MIT -T TO 2,500 PSI PASS. Pumped 2 bbl meth spear followed by 440 bbls diesel down IA taking returns up TBG down flowline to circ -out well. Pumped 2.5 bbls diesel to achieve test pressure. 1st 15 min TBG loss = 95 psi. 2nd 15 min TBG loss = 37 psi. Total loss in 30 min test = 132 psi. MIT -T 2500 psi ***PASS***. Bled TBG pressure to 300 psi. Bled back- 6 bbls. FP FL using WOA crude recipie 10 neat 113 crude 1/13/2016 FWEHP=300/0/0 (slickline on well has control annulus valves open to gauges). 2/25/2016 T/1/0=1400/0/0. Pre Nordic 2. Install CTD TS 06. PT tree cap to 500 psi. Final WHP's 1400/0/0. T/1/0=1400/0/0. PT'd Bottom Side SV, Top Side SV Gate, and TS to API specs. (PASS). Installed PT 2/26/2016 record on MV hand wheel. RDMO. FWHP=1400/0/0. T/I/O = 1060/10Nac. Temp = SI. Bleed WHPs (Pre CTD). No AL, flowline or wellhouse. Drilling scaffold installed. T FL & OA FL near surface. IA FL @ surface. Bled TP from 1060 psi to 0 psi (gas & 0.3 bbls fluid) to slop tank in 50 mins. IA went on a vac. Monitored for 30 mins. TP increased 21 2/29/2016 psi. Final WHPs= 21Nac/Vac. SV, WV & SSV = C. MV = O. IA & OA = OTG. 11:55. North America - ALASKA - BP Prudhoe Bay PB DS 16 16-15 16-15A 500292147401 Design: 16-15A Final Survey Report 02 March, 2016 rias BAKER HUGHES b PB DS 16, TR -10-15 Map 0.00 usft BP 5,927,441.990 usft 718,969.B80 usft 0.000 in reA.s P Well Final Survey Report Version: BAKER ACTUAL Tie On Depth: 11,640.51 Well Position +w.S 0.00 daft HUGHES Company: North America -ALASKA -BP Local Co-ordinate Reference: Well 16-15 +Ef-W 0.00 usft Project Prudhoe Bay TVD Reference: orkb @ 70.00usft Position Uncertainty Site: PS DS 16 MD Reference: orkb @ 70.00usft 36.69 usft Well: 16-15 North Reference: True Wellbore: 16.15A Survey Calculation Method: Minimum Curvature Design: 16-1 SA Database: EDM RSK- Alaska PROD -ANCPI Declination Project Prudhoe Bay, GPB, PRUDHOE BAY (1) Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level BGGM2015 2112016 Geo Datum: NAD 1927 (NADCON CONUS) 57,552 Using Wall Reference Point Map Zone: Alaska Zone 04 Using geodetic scale tactor Site Site Position: From: Position Uncertainty: PB DS 16, TR -10-15 Map 0.00 usft Northing: Easting: Slat Radius: 5,927,441.990 usft 718,969.B80 usft 0.000 in Latitude: Longitude: Grid Convergence: 70° 12'15.545 N 148° 14'4.567 W 1.66 ° Well 16.15, 16-15 Version: 1.0 Phase: ACTUAL Tie On Depth: 11,640.51 Well Position +w.S 0.00 daft Northing: 5,929,512.870 usft Latitude: 70° 12'35.816 N (usm +Ef-W 0.00 usft Easting: 719,280.830 usft Longitude: 148° 13' 53.802 W Position Uncertainty 0.00 usft Wellhead Elevation: 39.96 usft Ground Level: 36.69 usft Walloons16-15A Magnetics Model Name Sample Data Declination Dip Angle Field Strength (1) (1) Inn BGGM2015 2112016 19.38 81.03 57,552 Design 16-15A Audit Nobs: Version: 1.0 Phase: ACTUAL Tie On Depth: 11,640.51 Vertical Section: Depth From (TVD) +w—S +FJ -NI Direction (uslq (usm loft) 1') 30.04 0.00 0.00 327.98 3/2/2016 3:3859PM Page 2 COMPASS 5000.1 Build 61 by BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft Site: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM RSK- Alaska PROD -ANCP1 Survey Program Date 31=016 Fran To (usR) (MM Survey(Wellbore) Tool Name Description 100.00 10,800.00 GyroData Gyro (16-15) GVD-CT-CMS Gyrodata cont.casin9 mis 10,820.00 11,640.51 CTK MWD 4-1/4"(16-15APB1) MWD MWD -Standard 11,650.00 12,550.22 CTK MWD 4-1/4"(16-15A) MWD MWD -Standard Survey_ MD Inc Azi (azimuth) TVD TVDSS NIS EAV Northing Eastblg DLP (1251) 1°I P) (usR) (usR) (usp (usm lusts) (ustt) (°1100usp 30.04 0.00 0.00 30.04 -39.96 0.00 0.00 5,929,512.870 719280.830 0.00 100.00 0.21 282.32 100.00 30.00 0.03 -0.13 5,929,512.894 719,280.704 0.30 200.00 0.38 258.69 200.00 130.00 0.00 -0.63 5,929,512.853 719,280.201 0.21 300.00 0.32 247.60 300.00 230.00 -0.17 -1.21 5,929,512.665 719,279.623 0.09 400.00 0.55 227.06 399.99 329.99 -0.60 -1.82 5,929,512.214 719,279.026 0.27 500.00 0.47 216.10 499.99 429.99 -1.26 -2.42 5,929,511.539 719,278.452 0.13 600.00 0.49 165.33 599.99 529.99 -2.01 -2.55 5,929,510.790 719,278.341 0.41 700.00 0.52 148.46 699.98 629.98 -2.81 -2.20 5,929,510,000 719,278.709 0.15 800.00 0.37 155.20 799.98 729.98 -3.49 -1.83 5,929,509.331 719,279.102 0.16 900.00 0.53 144.01 899.98 829.98 4.15 -1.42 5,929,508.676 719,279.528 0.18 1,000.00 0.52 137.07 999.97 929.97 4.86 -0.84 5,929,507.987 719,280.129 0.06 1,100.00 0.38 145.44 1,099.97 1,029.97 -5.47 -0.35 5,929,507.396 719,280.644 0.15 1,200.00 0.43 102.25 1,199.97 1,129.97 -5.82 0.21 5,929,507.060 719,281.209 0.30 1,300.00 0.48 85.93 1,299.96 1,229.96 -5.87 0.99 5,929,507.033 719,281.994 0.14 1,400.00 0.43 79.70 1,399.96 1,329.96 -5.77 1.78 5,929,507.152 719,282.778 0.07 1,500.00 0.28 95.19 1,499.96 1,429.96 -5.73 2.39 5,929,507.215 719,283.389 0.18 1,600.00 0.41 81.98 1,599.96 1,529.96 -5.70 2.99 5,929,507.260 719,283.986 0.15 1,700.00 0.34 111.60 1,699.96 1,629.96 -5.76 3.62 5,929,507.219 719,284.617 0.20 1,800.00 0.19 41.87 1,799.95 1,729.95 -5.74 4.Dl 5,929,507.245 719,285.003 0.33 1,900.00 0.34 70.74 1,899.95 1,829.95 -5.52 4.40 5,929,507.477 719,285.387 0.20 //am BAKER HUGHES V. See Wel" 0.00 0.09 0.33 0.50 0.45 0.21 -0.35 -1.21 -1.99 -2.77 -3.67 -4.45 -5.04 -5.50 -5.84 -6.12 -6.42 -6.80 -7.00 -7.02 3/2/2016 3:37:59PM Page 3 COMPASS 5000.1 Build 61 BP I/.fag by Final Survey Report BAKER HUGHES Company: North America -ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft Site: PS DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM RSK-Alaska PROD -ANCP1 Survey Mo Inc AN (azimuth) TVD TVDSS NUS ENV Northing Easting DLeg V. sec Will 11 1°I (usft) lusftl Nsm luck) (usft) 1145110 (Wousf10 (uaf10 2,000.00 0.48 44.16 1,999.95 1,929.95 -5.12 4.97 5,929,507.892 719,285.947 0.23 -6.98 2,100.00 0.65 55.61 2,099.95 2,029.95 4.50 5.73 5,929,508.535 719,286.689 0.20 -6.86 2,200.00 0.40 35.31 2,199.94 2,129.94 -3.90 6.40 5,929,509.159 719,287.341 0.31 3.70 2,300.00 0.29 40.88 2,299.94 2,229.94 -3.42 6.77 5,929,509.646 719,287.694 D.11 -5.49 2,400.00 0.15 74.70 2,399.94 2,329.94 -3.20 7.06 5,929,509.880 719,287.979 0.19 3.45 2,500.00 0.22 127.96 2,499.94 2,429.94 -3.28 7.34 5,929,509.805 719,288.259 0.18 -6.67 2,600.00 0.07 231.14 2,599.94 2,529.94 -3.44 7.44 5,929,509.651 719,288.368 0.25 3.86 2,700.00 0.19 104.55 2,699.94 2,629.94 -3.52 7.55 5,929,509.575 719,288.483 0.24 3.99 2,800.00 1.41 327.64 2,799.93 2,729.93 -2.52 7.06 5,929,510.557 719,287.956 1.55 -5.88 2,900.00 4.02 310.17 2,899.81 2,829.81 0.78 3.72 5,929,513.760 719,284.524 2.71 -1.31 3,000.00 5.00 315.88 2,999.50 2,929.50 6.17 -1.99 5,929,518.981 719,278.658 1.08 6.29 3,100.00 5.48 314.41 3,099.08 3,D29.08 12.64 -8.44 5,929,525.261 719,272.028 0.50 15.19 3,200.00 7.30 328.59 3,198.46 3,128.46 21.41 -15.16 5,929,533.826 719,265.054 2.40 26.19 3,300.00 9.88 316.02 3,297.34 3,227.34 33.01 -24.43 5,929,545.151 719,255.451 3.18 40.94 3,325.00 10.78 312.78 3,321.93 3,251.93 36.14 -27.64 5,929,548.187 719,252.156 4.28 45.29 3,350.00 11.32 309.68 3,346.47 3,276.47 39.29 -31.24 5,929,551.236 719,248.461 3.21 49.88 3,375.00 11.95 308.44 3,370.96 3,300.96 42.47 -35.16 5,929,554.296 719,244.455 2.71 54.65 3,400.00 12.62 307.67 3,395.39 3,325.39 45.75 -39.35 5,929,557.451 719,240.173 2.76 59.65 3,425.00 13.13 307.86 3,419.76 3,349.76 49.16 43.75 5,929,560.734 719,235.672 2.05 64.88 3,450.00 13.50 307.84 3,444.08 3,374.08 52.69 48.30 5,929,564.133 719,231.026 1.48 70.28 3,475.00 13.77 307.93 3,468.38 3,398.38 56.31 -52.95 5,929,567.615 719,226.271 1.08 75.82 3,500.00 14.11 308.18 3,492.64 3,422.64 60.02 -57.89 5,929,571.188 719,221.424 1.38 81.48 3,525.00 14.43 308.46 3,516.87 3,446.87 63.84 32.53 5,929,574.867 719,216.480 1.31 87.28 3,550.00 14.71 308.80 3,541.07 3,471.07 67.77 37.44 5,929,578.649 719,211.456 1.17 93.22 3,575.00 14.97 309.16 3,565.23 3,495.23 71.80 -72.42 5,929,582.530 719,206.364 1.10 99.27 3,600.00 15.31 309.30 3,589.37 3,519.37 75.93 -77.47 5,929,586.511 719,201.188 1.37 105.45 3,625.00 15.56 309.64 3,613.46 3,543.46 80.16 -82.61 5,929,590.590 719,195.932 1.06 111.76 31212016 3:37:59PM Page 4 COMPASS 5000.1 Build 61 BP I/.FA\ by Final Survey Report BAKER HUGHES Company: North America -ALASKA -BP Local Coordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb ® 70.00usft SRO: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16.15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM RSK-Alaska PROD -ANCP7 Survey MD has, Azi(azimuth) TVD TVDSS Will PJW Northing Eaatlng OLeg V. Sec (usfq 1°) (') (usM (uafq (-fq luefq Will (usfq (°1100usfq (uslq 3,650.00 15.89 310.06 3,637.53 3,567.53 84.50 -87.81 5,929,594.778 719,190.607 1.40 118.20 3,675.00 16.28 310.59 3,661.55 3,591.55 88.98 -93.09 5,929,599.105 719,185.199 1.67 124.80 3,700.00 16.79 310.94 3,685.52 3,615.52 93.63 -98.48 5,929,603.593 719,179.678 2.08 131.60 3,725.00 17.41 311.02 3,709.41 3,639.41 98.45 -104.03 5,929,608.250 719,173.991 2.48 138.63 3,750.00 17.86 311.32 3,733.24 3,663.24 103.43 -109.73 5,929,613.068 718,168.148 1.84 145.88 3,775.00 18.67 311.59 3,756.98 3,686.98 108.62 -115.60 5,929,618.083 719,162.128 3.26 153.39 3,800.00 19.44 311.71 3,780.61 3,710.61 114.04 -121.70 5,929,623.328 719,155.874 3.08 161.22 3,825.00 20.13 311.83 3,804.13 3,734.13 119.68 -128.01 5,929,628.779 719,149.402 2.76 169.35 3,850.00 20.76 311.98 3,827.56 3,757.56 125.51 -134.51 5,929,634.420 719,142.737 2.53 177.74 3,875.00 21.42 312.21 3,850.88 3,780.88 131.55 -141.19 5,929,640.254 719,135.890 2.66 186.39 3,900.00 22.24 312.59 3,874.09 3,804.09 137.81 -148.05 5,929,646.321 719,128.847 3.33 195.35 3,925.00 23.11 312.88 3,897.16 3,827.16 144.35 -155.13 5,929,652.652 719,121.582 3.51 204.65 3,950.00 23.74 313.11 3,920.09 3,850.09 151.13 -162.40 5,929,659.216 719,114.119 2.55 214.25 3,975.00 24.43 313.32 3,942.92 3,872.92 158.12 -169.83 5,929,665.983 719,108.485 2.78 224.11 4,000.00 25.22 313.47 3,965.61 3,895.61 165.33 -177.46 5,929,672.969 719,098.652 3.17 234.27 4,025.00 26.03 313.58 3,988.15 3,918.15 172.78 -185.30 5,929,680.184 719,090.600 3.25 244.74 4,050.00 26.74 313.73 4,010.54 3,940.54 180.44 -193.34 5,929,687.616 719,082.343 2.85 255.50 4,075.00 27.46 313.87 4,032.80 3,962.80 188.33 -201.56 5,929,695.257 719,073.899 2.89 266.55 4,100.00 28.23 313.99 4,054.90 3,984.90 196.43 -209.97 5,929,703.110 719,065.258 3.09 277.87 4,125.00 29.11 314.05 4,076.64 4,006.84 204.76 -218.59 5,929,711.191 719,056.395 3.52 289.51 4,150.00 30.00 314.07 4,098.59 4,028.59 213.34 -227.45 5,929,719.505 719,047.289 3.56 301.48 4,175.00 30.84 314.08 4,120.14 4,050.14 222.14 -236.55 5,929,728.042 719,037.943 3.36 313.77 4,200.00 31.75 314.16 4,141.51 4,071.51 231.18 -245.87 5,929,736.807 719,028.363 3.64 326.38 4,225.00 32.66 314.22 4,162.66 4,092.66 240.47 -255.42 5,929,745.812 719,018.544 3.64 339.32 4,250.00 33.56 314.40 4,183.80 4,113.60 250.01 -255.19 5,929,755.064 719,008.500 3.82 352.59 4,275.00 34.35 314.60 4,204.34 4,134.34 259.80 -275.15 5,929,764.557 718,998.261 3.19 366.17 4,300.00 34.97 314.76 4,224.90 4,154.90 269.80 -285.26 5,929,774.256 718,987.866 2.51 380.00 3/2/2016 3:37:59PM Page 5 COMPASS 5000.1 Build 61 b BP WGaw P Final Survey Report BAKER •« HUGHES Company: North America - ALASKA - BP Local Coordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 7D.ODusft Site: PB DS 16 MD Reference: orkb @ 7D.00usft Walt: 16-15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc AN (azimuth) TVD TVDSS NIS HW Northing Beading DLeg V. Sec NaR) n !°) (ueR) (wlq lui luslq (usf" (uaM (`1100usm ("to 4,325.00 35.46 314.88 4,245.33 4,175.33 279.96 -295.49 5,929,784.116 718,977,350 1.98 394.04 4,350.00 35.94 315.04 4,265.63 4,195.63 290.27 -305.81 5,929,794.120 718,966.733 1.96 408.25 4,375.00 36.56 315.18 4,285.79 4,215.79 300.74 -316.24 5,929,804.285 718,956.001 2.50 422.66 4,400.00 37.36 315.30 4,305.76 4,235.76 311.41 -326.83 5,929,814.646 718,945.112 3.21 437.33 4,425.00 38.15 315.28 4,325.53 4,255.53 322.29 -337.60 5,929,825.207 718,934.033 3.16 452.26 4,450.00 39.16 315.25 4,345.05 4,275.05 333.38 -348.59 5,929,835.975 718,922.725 4.04 467.49 4,475.00 40.55 315.43 4,364.24 4,294.24 344.78 -359.85 5,929,847.039 718,911.139 5.58 483.12 4,500.00 42.00 315.92 4,383.03 4,313.03 356.58 -371.37 5,929,858.497 718,899.279 5.94 499.24 4,525.00 43.24 316.08 4,401.43 4,331.43 368.75 -383.13 5,929,870.327 718,887.172 4.98 515.80 4,550.00 44.32 316.18 4,419.48 4,349.48 381.22 -395.12 5,929,882.443 718,874.826 4.33 532.73 4,575.00 44.94 316.25 4,437.27 4,367.27 393.90 -407.27 5,929,894.764 718,862.313 2.49 549.92 4,600.00 45.24 316.28 4,454.92 4,384.92 406.70 419.51 5,929,907.195 718,849.707 1.20 567.26 4,625.00 45.49 316.27 4,472.48 4,402.48 419.55 431.81 5,929,919.688 718,837.043 1.00 584.68 4,650.00 45.73 316.28 4,489.97 4,419.97 432.46 444.15 5,929,932.234 718,824.326 0.96 602.17 4,675.00 45.98 316.30 4,507.39 4,437.39 445.43 456.55 5,929,944.835 718,811.558 1.00 619.74 4,700.00 46.02 316.46 4,524.75 4,454.75 458.45 468.96 5,929,957.468 718,798.780 0.49 637.35 4,725.00 46.08 316.57 4,542.10 4,472.10 471.51 481.34 5,929,970.181 718,786.021 0.40 654.99 4,750.00 46.19 316.63 4,559.43 4,489.43 484.60 493.73 5,929,982.911 718,773.262 0.47 672.66 4,775.00 46.28 316.70 4,576.72 4,506.72 497.74 -506.12 5,929,995.678 718,760.496 0.41 690.37 4,800.00 46.31 316.73 4,593.99 4,523.99 510.89 -518.51 5,930,008.468 718,747.729 0.15 708.09 4,825.00 46.46 316.71 4,611.24 4,541.24 524.07 -530.92 5,930,021.278 718,734.944 0.60 725.84 4,850.00 46.69 316.76 4,628.42 4,558.42 537.29 -543.36 5,930,034.132 718,722.121 0.93 743.65 4,875.00 46.78 316.83 4,645.56 4,575.56 550.56 -555.82 5,930,047.034 718,709.279 0.41 761.51 4,900.00 46.83 316.87 4,662.67 4,592.67 563.86 -568.29 5,930,059.962 718,696.434 0.23 779.39 4,925.00 46.98 316.91 4,679.75 4,609.75 577.18 -580.76 5,930,072.921 718,683.577 0.61 797.31 4,950.00 47.02 317.02 4,696.80 4,626.80 590.55 -593.24 5,930,085.917 718,670.717 0.36 815.25 4,975.00 47.16 317.04 4,713.82 4,643.82 603.95 -605.72 5,930,098.946 718,657.853 0.56 833.23 31212016 3: 37.59PM Page 6 COMPASS 5000.1 Build 61 BP RUN by Final Survey Report BAKER HUGHES Company: North America -ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft Site: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16.15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM RSK-Alaska PROD-ANCP1 Survey MO Inc Ail (azimuth) ND NDS$ NIS EIW Northing Easting OLeg V. Sec (est" (1) (1) (Usm (est" Nat" (usR) (rrsft) Wo (°1100usR) (usg) 5,000.00 47.34 317.06 4,730.79 4,660.79 617.38 -618.23 5,930,112.014 718,644.960 0.72 851.26 5,025.00 47.18 317.18 4,747.76 4,677.76 630.84 -630.73 5,930,125.100 718,632.081 0.73 869.29 5,050.00 46.87 317.40 4,764.80 4,694.80 644.28 -643.13 5,930,138.173 718,619.290 1.40 887.26 5,075.00 46.75 317.66 4,781.91 4,711.91 657.72 -655.44 5,930,151.255 718,606.598 0.90 905.19 5,100.00 46.88 317.89 4,799.02 4,729.02 671.22 -667.69 5,930,164.391 718,593.961 0.85 823.13 5,125.00 47.10 317.97 4,816.07 4,746.07 684.79 679.94 5,930,177.600 718,581.324 0.91 941.13 5,150.00 47.36 317.99 4,833.05 4,763.05 698.43 692.22 5,930,190.870 718,568.649 1.04 959.20 5,175.00 47.43 318.07 4,849.97 4,779.97 712.11 -704.53 5,930,204.188 718,555.952 0.37 977.33 5,200.00 47.46 318.14 4,866.88 4,796.88 725.82 -716.83 5,930,217.532 718,543.263 0.24 985.47 5,225.00 47.63 318.14 4,883.75 4,813.75 739.55 -729.14 5,930,230.906 718,530.561 0.68 1,013.64 5,250.00 47.79 318.05 4,900.58 4,830.58 753.32 -741.49 5,930,244.305 718,517.815 0.69 1,031.86 5,275.00 47.95 317.41 4,917.35 4,847.35 767.04 -753.96 5,930,257.656 718,504.951 2.00 1,050.11 5,300.00 48.11 316.45 4,934.07 4,864.07 780.62 -766.65 5,930,270.859 718,491.870 2.93 1,068.35 5,325.00 48.36 315.95 4,950.72 4,880.72 794.07 -779.56 5,930,283.937 718,478.579 1.80 1,086.60 5,350.00 48.65 315.85 4,967.28 4,887.28 807.52 -792.59 5,930,296.999 718,465.163 1.20 1,104.91 5,375.00 48.90 315.82 4,983.76 4,913.76 821.01 -805.69 5,930,310.100 718,451.677 1.00 1,123.30 5,400.00 49.02 315.74 5,000.17 4,930.17 834.52 -818.84 5,930,323.226 718,438.140 0.54 1,141.73 5,425.00 49.33 315.76 5,016.52 4,946.52 848.07 -832.04 5,930,336.387 718,424.552 1.24 1,160.22 5,450.00 49.61 315.75 5,032.76 4,962.76 861.69 -845.30 5,830,349.608 718,410.905 1.12 1,178.79 5,475.00 49.91 315.75 5,048.91 4,978.91 875.36 658.61 5,930,362.884 718,397.198 1.20 1,197.44 5,500.00 50.18 315.71 5,064.97 4,994.97 889.08 671.99 5,930,376.212 718,383.429 1.09 1,216.16 5,525.00 50.27 315.51 5,080.96 5,D10.96 902.81 685.43 5,930,389.545 718,369.595 0.71 1,234.93 5,550.00 49.99 314.85 5,096.99 5,026.99 916.42 -898.96 5,930,402.757 718,355.682 2.32 1,253.64 5,575.00 49.60 314.19 5,113.13 5,043.13 929.81 -912.57 5,930,415.743 718,341.686 2.55 1,272.21 5,600.00 48.53 313.19 5,129.51 5,059.51 942.85 -926.23 5,930,428.386 718,327.659 5.24 1,290.51 5,625.00 47.52 312.46 5,146.23 5,076.23 955.49 -939.86 5,930,440.619 718,313.668 4.59 1,308.45 5,650.00 46.81 312.14 5,163.22 5,093.22 967.82 -953.42 5,930,452.558 718,299.756 2.99 1,326.10 322016 3:37:59PM Page 7 COMPASS 5000.1 Build 61 M BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft Site: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16.15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM RSK-Alaska PROD -ANCP1 FUG KER UGHES Survey MD Inc AN (aximrdh) TVD TVDSS NIS FI1N Northing Feeling DLeg V. Sec (asM 0 (°I (usft) Wo (usft) (usft) (usR) (Wall" (°110ousfq (ush) 5,675.00 46.42 312.10 5,180.39 5,110.39 980.01 -966.89 5,930,464.346 718,285.932 1.56 1,343.58 5,700.00 46.51 312.07 5,197.61 5,127.61 992.16 -980.34 5,930,476.097 718,272.135 0.37 1,361.01 5,725.00 46.52 312.18 5,214.82 5,144.82 1,004.32 -993.80 5,930,487,868 718,258.335 0.32 1,378.46 5,750.00 46.41 312.39 5,232.04 5,162.04 1,016.52 -1,007.20 5,930,499.667 718,244.579 0.75 1,395.91 5,775.00 46.19 312.67 5,249.31 5,179.31 1,028.74 -1,020.52 5,930,511.492 718,230.911 1.20 1,413.33 5,800.00 46.06 312.90 5,266.64 5,196.64 1,040.98 -1,033.75 5,930,523.343 718,217.336 0.84 1,430.72 5,825.00 46.17 312.98 5,283.97 5,213.97 1,053.25 -1,046.94 5,930,535.229 718,203.795 0.50 1,448.12 5,850.00 46.29 313.01 5,301.26 5,231.26 1,065.56 -1,060.14 5,930,547.151 718,190.239 0.49 1,465.56 5,875.00 46.28 313.06 5,318.54 5,248.54 1,077.89 -1,073.35 5,930,559.093 718.176.680 0.15 1,483.02 51900.00 46.43 313.09 5,335.79 5,265.79 1,090.25 -1,086.57 5,930,571.059 718,163.113 0.61 1,500.50 5,925.00 46.34 313.14 5,353.04 5,283.04 1,102.62 -1,099.78 5,930,583.040 718,149.547 0.39 1,518.00 5,950.00 46.15 313.21 5,370.33 5,300.33 1,114.98 -1,112.95 5,930,595.007 718,136.026 0.79 1,535.46 5,975.00 46.15 313.26 5,387.65 5,317.65 1,127.32 -1,126.D8 5,930.606.970 718,122.538 0.14 1,552.89 6,000.00 46.45 313.28 5,404.92 5,334.92 1,139.71 -1,139.24 5,930,618.970 718,109.D24 1.20 1,570.37 6,025.00 46.21 313.42 5,422.18 5,352.18 1,152.13 -1,152.39 5,930,630.996 718,095.520 1.04 1,587.87 6,050.00 46.29 313.53 5,439.47 5,369.47 1,164.55 -1,165.50 5,930,643.035 718,082.060 0.45 1,605.35 6,075.00 46.36 313.76 5,456.73 5,386.73 1,177.03 -1,178.58 5,930,655.129 718,068.620 0.72 1,622.87 6,100.00 46.33 314.09 5,473.99 5,403.99 1,189.58 -1,191.61 5,930,667.293 718,055.234 0.96 1,640.42 6,125.00 46.22 314.44 5,491.27 5,421.27 1,202.19 -1,204.55 5,930,679.521 718,041.936 1.10 1,657.97 6,150.00 46.05 314.78 5,508.60 5,438.60 1,214.85 -1,217.38 5,930,691.801 718,028.743 1.19 1,675.51 6,175.00 45.97 315.04 5,525.96 5,455.96 1,227.55 -1,230.12 5,930,704.123 718,015.642 0.81 1,693.03 6,200.00 46.01 315.25 5,543.33 5,473.33 1,240.29 -1,242.80 5,930,716.495 718,002.596 0.62 1,710.56 6,225.00 46.01 315.46 5,560.69 5,490.69 1,253.09 -1,255.44 5,930,728.919 717,989.590 0.60 1,728.11 6,250.00 45.96 315.65 5,578.06 5,508.06 1,265.92 -1,268.03 5,930,741.383 717,976.634 0.58 1,745.67 6,275.00 45.87 315.83 5,595.46 5,525.46 1,278.79 -1,280.56 5,930,753.874 717,963.734 0.63 1,763.22 6,300.00 45.66 315.98 5,612.90 5,542.90 1,291.65 -1,293.03 5,930,766.370 717,950.902 0.94 1,780.73 6,325.00 45.73 316.D5 5,630.36 5,560.36 1,304.52 -1,305.45 5,930,778.876 717,938.109 0.34 1,798.23 31212016 3:37:59PM Page 6 COMPASS 5000.1 Build 61 BP FEARSby Final Survey Report OKER HUGIiE.i Company: North America - ALASKA - BP Local Coordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70,00ush Site: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16 -ISA Database: EDM RSK- Alaska PROD -ANCP7 Survey MD Inc AM (azimuth) ND 7VDSS NIS EIW Northing Earting DLeg V. sac (asfo (1 11 Will (non) (wfq lush) (usft) (-M (°110th efq (usfq 6,350.00 45.80 316.13 5,647.80 5,577.80 1,317.43 -1,317.87 5,930,791.414 717,925.318 0.36 1.815.76 6,375.00 45.85 316.23 5,665.22 5,595.22 1,330.36 -1,330.29 5,930,803.985 717,912.533 0.35 1,833.31 6,400.00 46.00 316.33 5,682.61 5,612.61 1,343.34 -1,342.70 5,930,816.599 717,899.749 0.67 1,850.90 6,425.00 46.32 316.42 5,699.93 5,629.93 1,356.40 -1,355.14 5,930,829.284 717,886.935 1.31 1,868.57 6,450.00 46.66 316.52 5,717.14 5,647.14 1,369.54 -1,367.63 5,930,842.061 717,874.071 1.39 1,886.33 6,475.00 47.00 316.68 5,734.24 5,664.24 1,382.79 -1,380.16 5,930,854.939 717,861.165 1.44 1,904.21 6,500.00 47.30 316.76 5,751.24 5,681.24 1,396.13 -1,392.72 5,930,867.911 717,848.218 1.22 1,922.18 6,525.00 47,63 316.85 5,768.15 5,698.15 1,409.56 -1,405.33 5,930,880.968 717,835.224 1.35 1,940.25 6,550.00 47.95 316.96 5,784,94 5,714.94 1,423.09 -1,417.98 5,930,894.116 717,822.187 1.32 1,958.43 6,575.00 48.23 317.12 5,801.64 5,731.64 1,436.70 -1,430.66 5,930,907.358 717,809.118 1.22 1,976.69 6,600.00 48.54 317.28 5,818.24 5,748.24 1,450.42 -1,443.36 5,930,920.696 717,796.027 1.33 1,995.05 6,625.00 48.93 317.51 5,834.73 5,764.73 1,464.25 -1,456.08 5,930,934.152 717,782.910 1.71 2,013.53 6,650.00 49.38 317.61 5,851.08 5,781.08 1,478.20 -1,468.84 5,930,947.732 717,769.749 1.83 2,032.13 6,675.00 49.73 317.69 5,867.30 5,797.30 1,492.26 -1,481.66 5,930,961.414 717,756.530 1,42 2,050.84 6,700.00 49.84 317.76 5,883.44 5,813.44 1,506.39 -1,494.50 5,930.975.160 717,743.284 0.49 2,069.63 6,725.00 49.76 317.82 5,899.58 5,629.58 1,520.53 -1,507.33 5,930,988.924 717,730.050 0.37 2,088.42 6,750.00 49.90 317.79 5,915.71 5,845.71 1,534.69 -1,520.16 5,931,002.698 717,716.614 0.57 2,107.23 6,775.00 49.97 317.74 5,931.80 5,861.80 1,548.85 -1,533.02 5,931,016.484 717,703.548 0.32 2,126.06 6,800.00 49.89 317.70 5,947.89 5,877.89 1,563.01 -1,545.89 5,931,030.258 717,690.273 0.34 2,144.88 6,825.00 49.66 317.66 5,964.03 5,894.03 1,577.12 -1,558.74 5,931,043.992 717,677.017 0.93 2,163.66 6,850.00 49.48 317.61 5,980.25 5,910.25 1,591.18 -1,571.57 5,931,057,673 717,663.792 0.74 2,182.38 6,875.00 49.42 317.55 5,996.50 5,926.50 1,605.20 -1,584.38 5,931,071.318 717,650.577 0.30 2,201.07 6,900.00 48.94 317.42 6,012.84 5,942.84 1,619.15 -1,597.17 5,931,084.886 717,637.393 1.96 2,219.67 6,925.00 48.93 317.37 6,029.27 5,959.27 1,633.02 -1,609.93 5,931,098.382 717,624.236 0.16 2,238.20 6,950.00 48.78 317.35 6,045.71 5,975.71 1,646.87 -1,622.68 5,931,111.654 717,611.087 0.60 2,256.70 6,975.00 48.61 317.31 6,062.22 5,992.22 1,660.68 -1,635.41 5,931,125.287 717,597.963 0.69 2,275.16 7,000.00 48.52 317.26 6,078.76 6,008.76 1,674.45 -1,648.12 5,931,138.682 717,584.855 0.39 2,293.58 3/22016 3:37:59PM Page 8 COMPASS 5000.7 Build 61 b SP FGFAI P Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 16.15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft SRO: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16.15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi(azimuth) TVD TVDSS tis EM Northing Eluding DLeg V. Sao luslq C) I"1 lustq (usR) (uelq lustq (ilafq luau) p1460usfq luslq 7,025.00 48.56 317.22 6,095.31 6,025.31 1,688.21 -1,660.84 5,931,152.062 717,571.742 0.20 2,311.98 7,050.00 48.62 317.23 6,111.85 6,041.85 1,701.97 -1,673.58 5,931,165.449 717,558.615 0.24 2,330.40 7,075.00 48.59 317.22 6,128.38 6,058.38 1,715.74 -1,686.31 5,931,178.839 717,545.484 0.12 2,348.83 7,100.00 48.48 317.23 6,144.93 6,074.93 1,729.49 -1,699.04 5,931,192.214 717,532.368 0.44 2,367.23 7,125.00 48.41 317.28 6,161.52 6,091.52 1,743.23 -1,711.73 5,931,205.578 717,519.278 0.32 2,385.61 7,150.00 48.38 317.37 6,178.12 6,108.12 1,756.97 -1,724.40 5,931,218.947 717,506.213 0.29 2,403.99 7,175.00 48.35 317.45 6,194.73 6,124.73 1,770.73 -1,737.05 5,931,232.329 717,493.175 0.27 2,422.35 7,200.00 48.23 317.51 6.211.36 6,141.36 1,784.48 -1,749.66 5,931,245.712 717,480.168 0.51 2,440.70 7,225.00 48.10 317.59 6,228.04 6,158.04 1,798.23 -1,762.23 5,931,259.085 717,467.203 0.57 2,459.02 7,250.00 47.95 317.64 6,244.76 6,174.76 1,811.95 -1,774.76 5,931,272.443 717,454.281 0.62 2,477.31 7,275.00 47.84 317.69 6,261.52 6,191.52 1,825.66 -1,787.25 5,931,285.784 717,441.397 0.46 2,495.55 7,300.00 47.74 317.74 6,278.31 6,208.31 1,839.36 -1,799.71 5,931,299.115 717,428.547 0.43 2,513.78 7,325.00 47.62 317.78 6,295.15 6,225.15 1,853.05 -1,812.14 5,931,312.433 717,415.729 0.49 2,531.97 7,350.00 47.45 317.83 6,312.02 6,242.02 1,866.71 -1,824.53 5,931,325.730 717,402.951 0.70 2,550.12 7,375.00 47.38 317.84 6,326.94 6,258.94 1,880.36 -1,836.88 5,931,339.009 717,390.205 0.28 2,568.24 7,400.00 47.36 317.79 6,345.87 6,275.87 1,893.98 -1,849.23 5,931,352.273 717,377.463 0.17 2,586.34 7,425.00 47.32 317.79 6,362.81 6,292.81 1,907.60 -1,861.59 5,931,365.525 717,364.721 0.16 2,604.44 7,450.00 47.22 317.81 6,379.78 6,309.78 1,921.21 -1,873.92 5,931,378.765 717,351.997 0.40 2,622.51 7,475.00 47.05 317.79 6,396.78 6,326.78 1,934.78 -1,886.23 5,931,391.975 717,339.300 0.68 2,640.55 7,500.00 46.77 317.76 6,413.86 6,343.86 1,948.30 -1,898.50 5,931,405.132 717,326.643 1.12 2,658.52 7,525.00 46.76 317.78 6,430.99 6,360.99 1,961.79 -1,910.74 5,931,418.257 717,314.016 0.07 2,676.44 7,550.00 46.69 317.73 6,448.13 6,378.13 1,975.26 -1,922.98 5,931,431.370 717,301.393 0.32 2,694.35 7,575.00 46.56 317.65 6,465.29 6,395.29 1,988.70 -1,935.21 5,931,444.447 717,288.777 0.57 2,712.23 7,600.00 46.43 317.58 6,482.51 6,412.51 2,002.09 -1,947.43 5,931,457.479 717,276.170 0.56 2,730.07 7,625.00 46.34 317.50 6,499.75 6.429.75 2,015.45 -1,959.65 5,931,470.471 717,263.569 0.43 2,747.87 7,650.00 46.17 317.40 6,517.04 6,447.04 2,028.75 -1,971.87 5,931,483.415 717,250.975 0.74 2,765.63 7,675.00 45.99 317.29 6,534.38 6,464.38 2,041.99 -1,984.07 5,931,496.298 717,238.395 0.79 2,783.33 3/2/2016 3:37:59PM Page 10 COMPASS 5000.1 Build 61 b BP rrA.w P Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Pmdhce Bay TVD Reference: orkb ® 70.00usR Site: PB DS 16 MD Reference: orkb @ 70.00usn Well: 16.15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-16A Database: EDM RSK- Alaska PROD -ANCPl Survey _ MD Inc AN (azlmuth) TVD TVDSS WS EMI Northing Bseting DLP V. See (usm 1°I 0 lush) (MR) lush) (usR) (uaft) Will (°1100wft) lusfq 7,700.00 45.84 317.18 6,551.77 6,481.77 2,055.18 -1,996.26 5,931,509.122 717,225.824 0.68 2,800.97 7,725.00 45.83 317.06 6,569.19 6,499.19 2,068.32 -2,008.46 5,931,521.903 717,213.245 0.35 2,818.58 7,750.00 45.79 316.90 6,586.62 6,516.62 2,051.43 -2,020.69 5,931,534.647 717,200.641 0.49 2,636.18 7,775.00 45.61 316.71 6,604.08 6.534.08 2,094.47 -2,032.94 5,931,547.329 717,188.021 0.90 2,853.73 7,800.00 45.48 316.54 6,621.58 6,551.58 2,107.44 -2,045.20 5,931,559.939 717,175.394 0.71 2,871.23 7,825.00 45.21 316.39 6,639.16 6,569.16 2,120.33 -2,057.45 5,931,572.469 717,162.776 1.16 2,888.65 7,850.00 44.99 316.21 6,656.80 6,586.80 2,133.14 -2,069.68 5,931,584.911 717,150.176 1.02 2,906.00 7,875.00 45.01 316.02 6,674.48 6,604.48 2,145,88 -2,081.93 5,931,597.290 717,137.557 0.54 2,923.30 7,900.00 45.11 315.87 6,692.14 6,622.14 2,158.59 -2,094.24 5,931,609.644 717,124.889 0.58 2,940.60 7,925.00 45.07 315.76 6,709.79 6,639.79 2,171.29 -2,106.58 5,931,621.977 717,112.186 0.35 2,957.91 7,950.00 44.84 315.68 6,727.48 6,657.48 2,183.94 -2,118.91 5,931,634.259 717,099.492 0.95 2,975.17 7,975.00 44.78 315.59 6,745.22 6,675.22 2,196.53 -2,131.23 5,931,646.491 717,086.812 0.35 2,992,38 8,000.00 44.72 315.50 6,762.97 6,692.97 2,209.10 -2,143.56 5,931,658.690 717,074.127 0.35 3,009.67 8,026.00 44.55 315.40 6,780.76 6,710.76 2,221.61 -2,155.88 5,931,670.844 717,061.447 0,74 3,026.72 8,050.00 44.35 315.31 6,798.61 6,728.61 2,234.07 -2,166.18 5,931.682.937 717,048.789 0.84 3,043.80 8,075.00 44.21 315.27 6,816.51 6,746.51 2,246.47 -2,180.46 5,931,694.979 717,036.155 0.57 3,060.83 8,100.00 44.18 315.19 6,634.43 6,764.43 2,258.85 -2,192.74 5,931,706.989 717,023.528 0.25 3,077.83 8,125.00 44.16 315.15 6,852.36 6,782.36 2,271.20 -2,205.02 5,931,718.981 717,010.894 0.14 3,094.81 8,150.00 44.01 315.05 6,870.32 6,800.32 2,283.52 -2,217.29 5,931,730.939 716,998.264 0.66 3111.77 8,175.00 43.76 315.02 6,888.34 6,818.34 2,295.78 -2,229.54 5,931,742.839 716,985.667 1.00 3,128.66 8,200.00 43.54 315.04 6,906.43 6,836.43 2,307.99 -2,241.74 5,931,754.688 716,973.123 0.88 3,145.46 8,225.00 43.47 315.03 6,924.56 6,654.56 2,320.17 -2,253.90 5,931,766.506 716,960.613 0.28 3,162.25 8,250.00 43.45 314.95 6,942.71 6,872.71 2,332.32 -2,266.06 5,931,778.305 716,948.104 0.23 3,179.01 8,275.00 43.22 314.93 6,960.89 6.890.89 2,344.44 -2,278.20 5,931,790.065 716,935.613 0.92 3,195.72 8,300.00 42.98 314.90 6,979.14 6,909.14 2,356.50 -2,290.30 5,931,801.769 716,923.172 0.96 3,212.36 8,325.00 42.84 314.85 6,997.46 6.927.46 2,368.51 -2,302.36 5,931,813.423 716,910.767 0.58 3,228.94 8,350.00 42.68 314.82 7,015.81 6,945.81 2,380.48 -2,314.40 5,931,825.035 716,898.389 0.65 3,245.47 3/2/2016 3: 37.59PM Page 11 COMPASS 5000.1 Build 61 by BP I/r\ Final Survey Report BAKER HUGHES Cornparryl: North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project Prudhoe Bay TVD Reference: orkb 70.00ustt Site: PS DS 16 MD Reference: orkb ID 70.00usft Well: 16.15 North Reference: True Waltham: 16-15A Survey Calculation Method: Minimum Curvature Design: 1&16A Database: EDMRSK-Alaska PROD -ANCPt Survey MD Inc Azf(aalmuth) TVD TVDSS NIS EIW Northing Ems" DLeg V, Sec (-to (1 11 lusft) fust) (usfp (usfp (MM (MR) (°I100"fil (uslt) 8,375.00 42.44 314.80 7,034.22 6,964.22 2,392.40 -2,326.40 5,931,836.598 716,886.052 0.96 3,261.93 8,400.00 42.20 314.74 7,052.71 6,982.71 2,404.25 -2,338.34 5,931,848.099 716,873.764 0.97 3,278.32 8,425.00 41.87 314.73 7,071.28 7,001.28 2,416.03 -2,350.24 5,931,859.530 716,861.536 1.32 3,294.61 8,450.00 41.77 314.76 7,089.91 7,019.91 2,427.77 -2,362.08 5,931,870.916 716,849.361 0.41 3,310.84 8,475.00 41.67 314.79 7,108.57 7,038.57 2,439.49 -2,373.89 5,931,882.285 716,837.216 0.41 3,327.04 8,500.00 41.42 314.78 7,127.28 7,057.28 2,451.17 -2,385.65 5,931,893.618 716,825.114 1.00 3,343.18 8,525.00 41.05 314.68 7,146.08 7,076.08 2,462.76 -$397.36 5,931,904.870 716,813.076 1.50 3,359.22 8,550.00 40.98 314.60 7,164.94 7,094.94 2,474.29 -2,409.03 5,931,916.053 716,801.073 0.35 3,375.18 8,575.00 40.94 314.47 7,183.82 7,113.82 2,485.79 -2,420.72 5,931,927.203 716,789.063 0.38 3,391.12 8,600.00 40.75 314.28 7,202.73 7,132.73 2,497.22 -2,432.40 5,931,938.293 716,777.D50 0.91 3,407.01 8,625.00 40.45 314.10 7,221.72 7,151.72 2,508.56 -2,444.07 5,931,949.289 716,765.060 1.29 3,422.81 8,650.00 40.18 313.95 7,240.78 7,170.78 2,519.80 -2,455.70 5,931,960.187 716,753.109 1.15 3,438.51 8,675.00 40.10 313.83 7,259.89 7,189.89 2,530.97 -2,467.31 5,931,971.018 716,741.175 0.45 3,454.14 8,700.00 40.27 313.80 7,278.99 7,208.99 2,542.14 -2,478.95 5,931,981.843 716,729.216 0.68 3,469.78 8,725.00 40.49 313.83 7,298.03 7,228.03 2,553.36 -2,490.64 5,931,992.712 716,717.209 0.88 3,485.49 8,750.00 40.71 313.89 7,317.02 7,247.02 2,664.63 -2,502.37 5,932,003.639 716,705.157 0.89 3,501.27 8,775.00 40.96 314.00 7,335.93 7,265.93 2,575.97 -2,514.14 5,932,014.636 716,693.063 1.04 3,517.12 8,600.00 41.27 314.05 7,354.77 7,284.77 2,587.40 -2,525.95 5,932,025.712 716,680.916 1.25 3,533.08 8,825.00 41.64 314.05 7,373.50 7,303.50 2,598.91 -2,537.86 5,932,036.869 716,668.692 1.48 3,549.14 8,850.00 42.02 314.25 7,392.13 7,322.13 2,610.52 -2,549.82 5,932,048.130 716,656.397 1.61 3,565.33 8,875.00 42.19 314.32 7,410.68 7,340.68 2,622.22 -2,561.82 5,932,059.480 716,644.063 0.71 3,581.62 8,900.00 42.49 314.42 7,429.16 7,359.16 2,634.00 -2,573.86 5,932,070.899 716,631.690 1.23 3,597.98 8,925.00 42.91 314.59 7,447.53 7,377.53 2,645.88 -2,585.95 5,932,082.427 716,619.260 1.74 3,614.47 8,950.00 43.26 314.81 7,465.79 7,395.79 2,657.89 -2,598.09 5,932,094.081 716,606.778 1.52 3,631.09 8,975.00 43.43 315.05 7,483.97 7,413.97 2,670.01 -2,610.24 5,932,105.841 716,594.284 0.95 3,647.81 9,000.00 43.63 315.27 7,502.10 7,432.10 2,682.22 -2,622.38 5,932,117.692 716,581.794 1.00 3,664.60 9,025.00 43.91 315.31 7,520.15 7,450.15 2,694.51 -2,634.54 5,932,129.624 716,569.276 1.13 3,681.47 3/2/2016 3:37:59PM Page 12 COMPASS 5000.1 Build 61 BP FIRM by Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay ND Reference: orkb @ 70.00usft Site: PB DS 16 MD Reference: orkb Q 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Dabbase: EDMRSK-Aleska PROD -ANCP7 Survey MD Inc Azl (aximWh) TVD TVDSS WS ENV Northing Easting DLa9 V. Sec (usf" 1°I 1°I (waft) (usft) (usm (usfq Will frog) 1°1100 uslq luslq 9,050.00 44.08 315.30 7,538.13 7,468.13 2,706.86 -2,646.76 5,932,141.608 716,556.710 0.68 3,698.41 9,075.00 44.35 315.38 7,556.05 7,486.05 2,719.26 -2,659.01 5,932,153.646 716,544.101 1.10 3,715.42 9,100.00 44.71 315.49 7,573.87 7,503.87 2,731.75 -2,671.31 5,932,165.774 716,531.442 1.47 3,732.54 9,125.00 45.03 315.56 7,591.59 7,521.59 2,744.33 -2,683.67 5,932,177.995 716,518.725 1.30 3,749.76 9,150.00 45.24 315.63 7,609.23 7,539.23 2,756.99 -2,696.07 5,932,190.288 716,505.965 0.86 3,767.07 9,175.00 45.37 315.66 7,626.81 7,556.81 2,769.70 -2,708.49 5,932,202.628 716,493.178 0.53 3,784.43 9,200.00 45.72 315.70 7,644.32 7,574.32 2,782.47 -2,720.96 5,932,215.027 716,480.345 1.40 3,801.86 9,225.00 46.11 315.70 7,661.71 7,591.71 2,795.32 -2,733.50 5,932,227.509 716,467.436 1.56 3,819.41 9,250.00 46.42 315.68 7,679.00 7,609.00 2,808.24 -2,746.12 5,932,240.063 716,454.448 1.24 3,837.06 9,275.00 46.63 315.70 7,696,20 7,626.20 2,821.23 -2,758.79 5,932,252.670 716,441.404 0.84 3,854.78 9,300.00 46.79 315.75 7,713.34 7,643.34 2,834.26 -2,771.50 5,932,265.325 716,428.328 0.66 3,872.57 9,325.00 47.19 315.78 7,730.39 7,660.39 2,847.35 -2,784.25 5,932,278.046 716,415.201 1.60 3,890.43 9,350.00 47.52 315.81 7,747.33 7,677.33 2,860.54 -2,797.07 5,932,290.850 716,402.003 1.32 3,908.41 9,375.00 47.69 315.84 7,764.18 7,694.18 2,873.78 -2,809.94 5,932,303.712 716,388.759 0.69 3,926.46 9,400.00 47.77 315.84 7,781.00 7,711.00 2,887.05 -2,822.82 5,932,316.603 716,375.491 0.32 3,944.54 9,425.00 47.87 315.82 7,797.79 7,727.79 2,900.34 -2,835.73 5,932,329.510 716,362.203 0.40 3,962.66 9,450.00 48.10 315.76 7,814.52 7,744.52 2,913.65 -2,848.68 5,932,342.442 716,348.871 0.94 3,980.81 9,475.00 48.22 315.67 7,831.20 7,761.20 2,926.98 -2,861.69 5,932,355.391 716,335.485 0.55 3,999.01 9,500.00 48.26 315.60 7,847.85 7,777.85 2,940.32 -2,874.73 5,932,368.338 716,322.064 0.26 4,017.23 9,525.00 48.30 315.51 7,864.48 7,794.48 2,953.64 -2,887.80 5,932,381.274 716,308.617 0.31 4,035.45 9,550.00 48.41 315.40 7,681.10 7,811.10 2,966.95 -2,900.90 5,932,394.202 716,295.132 0.55 4,053.69 9,575.00 48.61 315.29 7,897.66 7,827.66 2,980.27 -2,914.06 5,932,407.135 716,281.589 0.87 4,071.96 9,600.00 48.72 315.27 7,914.17 7,844.17 2,993.61 -2,927.27 5,932,420.084 716,268.000 0.44 4,090.27 9,625.00 48.32 315.30 7,930.73 7,860.73 3,006.92 -2,940.45 5,932,433.004 716,254.442 1.60 4,108.55 9,650.00 48.07 315.32 7,947.39 7,877.39 3,020.17 -2,953.55 5,932,445.866 716,240.957 1.00 4,126.73 9,675.00 47.96 315.37 7,964.12 7,894.12 3,033.39 -2,966.61 5,932,458.699 716,227.519 0.46 4,144.86 9,700.00 47.86 315.41 7,980.87 7,910.87 3,046.60 -2,979.64 5,932,471.522 716,214.112 0.42 4,162.97 322016 3: 37:59PM Page 13 COMPASS 5000.1 Build 61 BP FBI &2 by Final Survey Report BAKER HUGHES Company: Norm America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft SRO: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16.15A Survey Calculation Method: Minimum Curvature Design: 16-16A Database: EDM RSK -Alaska PROD -ANCPI Survey MD Inc Azl (azimuth) ND TVDSS WS EIW Northing Easling OL" V. Sac Will (°j (°) (usR) (usto (uslq (usR) (usR) (tufo (°/190us$) (uslt) 9,725.00 47.62 315.40 7,997.69 7,927.69 3,059.77 -2,992.63 5,932,484.314 716,200.745 0.96 4,181.03 9,750.00 47.21 315.37 8,014.60 7,944.60 3,072.88 -3,005.56 5,932,497.036 716,187.443 1.64 4,198.99 9,775.00 47.22 315.30 8,031.58 7,961.58 3,085.92 -3,018.46 5,932,509.705 716,174.173 0.21 4,216.89 9,800,00 47.04 315.26 8,048.59 7,978.59 3,098.94 -3,031.35 5,932,522.343 716,160.908 0.73 4,234.77 9,825.00 46.74 315.30 8,065.68 7,995.68 3,111.91 -3,044.19 5,932,534.933 716,147.695 1.21 4,252.57 9,850.00 46.49 315.29 8,082.85 8,012.85 3,124.83 -3,056.98 5,932,547.469 716,134.545 1.00 4,270.30 9,875.00 46.36 315.18 8,100.08 8,030.08 3,137.68 -3,069.73 5,932,559.952 716,121.423 0.61 4,287.96 9,900.00 46.19 315.18 8,117.36 8,047.36 3,150.50 -3,082.46 5,932,572.391 716,108.322 0.68 4,305.58 9,925.00 45.86 315.31 8,134.72 6,064.72 3,163.28 -3,095.13 5,932,584.793 716,095.290 1.37 4,323.13 9,950.00 45.43 315.44 8,152.20 8,082.20 3,176.00 -3,107.69 5,932,597.145 716,082.370 1.76 4,340.57 9,975.00 45.20 315.55 8,169.78 8,099.78 3,188.67 -3,120.15 5,932,6D9.454 716,069.548 0.97 4,357.93 10,000.00 45.14 315.65 8,187.40 8,117.40 3,201.34 -3,132.55 5,932,621.755 716,056.781 0.37 4,375.25 10,025.00 45.06 315.75 8,205.05 8,135.05 3,214.02 -3,144.92 5,932,634.064 716,044.051 0.43 4,392.55 10,050.00 44.77 315.82 8,222.76 8,152.76 3,226.67 -3,157.23 5,932,646.352 716,031.380 1.18 4,409.80 10,075.00 44.59 315.96 8,240.53 8,170.53 3,239.29 -3,169.47 5,932,658,612 716,015.784 0.82 4,426.99 10,100.00 44.43 316.06 8,258.36 8,188.36 3,251.90 -3,181.64 5,932,670.862 716,006.251 0.70 4,444.14 10,125.00 44,20 316.28 8,276.25 8,206.25 3,264.50 -3,193.73 5,932,683.104 715,993,796 1.11 4,461.23 10,150.00 43.83 316.61 8,294.23 8,224.23 3,277.09 -3,205.70 5,932,695.340 715,981.466 1.74 4,478.25 10,175.00 43.34 316.98 8,312.34 8,242.34 3,289.65 -3,217.50 5,932,707.554 715,969.307 2.21 4,495.16 10,200.00 42.95 317.33 8,330.58 8,260.58 3,302.18 -3,229.13 5,932,719.745 715,957.323 1.83 4,511.95 10,225.00 42.72 317.85 8,348.91 8,278.91 3,314.73 -3,240.59 5,932,731.956 715,945.500 1.69 4,528.67 10,250.00 42.36 318.31 8,367.33 8,297.33 3,327.31 -3,251.88 5,932,744.199 715,933.848 1.90 4,545.32 10,275.00 41.95 318.77 8,385.86 8,315.86 3,339.88 -3,262.99 5,932,756.444 715,922.379 2.05 4,561.87 10,300.00 41.65 319.30 8,404.50 8,334.50 3,352.47 -3,273.92 5,932,768.704 715,911.094 1.85 4,578.33 10,325.00 41.48 319.88 8,423.20 8,353.20 3,365.10 -3,284.67 5,932,781.015 715,899.980 1.68 4,594.74 10,350.00 41.12 320.40 8,441.99 8,371.99 3,377.76 -3,295.25 5,932,793.367 715,889.042 1.99 4,611.09 10,375.00 40.68 321.02 8,460.88 8,390.88 3,390.43 -3,305.61 5,932,805.728 715,878.313 2.39 4,627.32 322016 3:37:59PM Page 14 COMPASS 5000.1 Build 61 b BP wGVal p Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bey TVD Reference: orkb @ 70.00usft Site: P8 DS 16 MD Reference: orkb @ 70.00usft Well: 16.15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS EMI Northing Easting DLP V. Sec lust" rl P) lust" (usR) (ustq (us8) IuaR) lusq 1°1100us ftl loaf" 10,400.00 40.48 321.35 8,479.87 8,409.87 3,403.10 -3,315.80 5,932,818.098 715,867.756 1.17 4,643.47 10,425.00 40.38 321.57 8,498.80 8,428.90 3,415.78 -3,325.91 5,932,830.480 715,857.291 0.70 4,659.58 10,450.00 40.29 321.77 8,517.96 8,447.96 3,428.47 -3,335.94 5,932,842.876 715,846.892 0.63 4,675.66 10,475.00 40.22 321.96 8,537.04 8,467.D4 3,441.18 -3,345.92 5,932,855.287 715,836.552 0.57 4,691.73 1D,500.00 40.29 322.03 8,556.12 8,486.12 3,453.91 -3,355.86 5,932,867.722 715,826.240 0.33 4,707.79 10,525.00 40.15 32229 8,575.20 8,505.20 3,466.66 -3,365.77 5,932,880.177 715,815.971 0.87 4,723.85 10,550.00 40.29 322.47 8,594.29 8,524.29 3,479.45 -3,375.62 5,932,892.671 715,805.750 0.73 4,739.92 10,575.00 40.45 322.65 8,613.34 8,543.34 3,492.30 -3,385.47 5,932,905.236 715,795.537 0.79 4,756.04 10,600.00 40.48 322.86 8,632.36 8,562.36 3,505.22 -3,395.29 5,932,917.861 715,785.347 0.56 4,772.20 10,625.00 40.36 323.06 8,651.39 8,581.39 3,518.16 -3,405.05 5,932,930.510 715,775.212 0.71 4,788.35 10,650.00 40.21 323.19 8,670.46 8,600.46 3,531.09 -3,414.75 5,932,943.153 715,765.141 0.69 4,804.45 10,675.00 40.42 323.31 8,689.53 8,619.53 3,544.05 -3,424.43 5,932,955.826 715,755.091 0.90 4,820.57 10,700.00 40.38 323.45 8,708.57 8,638.57 3,557.05 -3,434.09 5,932,968.544 715,745.053 0.40 4,836.72 10,725.00 40.35 323.78 8,727.61 8,657.61 3,570.09 -3,443.70 5,932,981.294 715,735.074 0.86 4,852.87 10,750.00 40.38 324.12 8,746.86 8,676.66 3,583.18 -3,453.23 5,932,994.102 715,725.170 0.89 4,869.02 10,775.00 40.36 324.26 8,765.71 8,695.71 3,596.31 -3,462.70 5,933,006.953 715,715.319 0.37 4,885.18 10,800.00 39.94 324.33 8,784.82 8,714.82 3,609.40 -3,472.11 5,933,019.763 715,705.535 1.69 4,901.26 10,820.00 39.56 324.20 8,800.19 8,73D.19 3,619.78 -3,479.58 5,933,029.923 715,697.768 1.92 4,914.03 10,840.01 40.83 326.00 8,815.48 8,745.48 3,630.37 -3,486.96 5,933,040.296 715,690.078 8.58 4,926.92 10,870.11 44.12 338.00 8,837.71 8,767.71 3,648.28 -3,496.41 5,933,057.920 715,680.117 29.01 4,947.11 10,900.70 52.00 349.00 8,858.18 8,788.18 3,670.06 -3,502.72 5,933,079.502 715,673.179 37.07 4,968.92 10,932.01 56.23 2.20 8,876.58 8,806.58 3,695.25 -3,504.58 5,933,104.634 715,670.587 36.69 4,991.27 10,960.19 59.08 14.12 8,891.69 8,821.69 3,718.75 -3,501.17 5,933,128.214 715,673.311 37.11 5,009.38 10,990.48 62.60 23.14 8,906.47 8,836.47 3,743.76 -3,492.70 5,933,153.459 715,681.051 28.47 5,026.10 11,020.27 70.21 27.87 8,918.39 8,848.39 3,768.36 -3,480.93 5,933,178.387 715,692.102 29.39 5,040.71 11,048.66 79.63 32.98 8,925.78 8,855.78 3,791.94 -3,467.05 5,933,202.368 715,705.295 37.45 5,053.35 11,080.23 83.85 41.99 8,930.32 8,860.32 3,816.69 -3,448.05 5,933,227.659 715,723.566 31.24 5,064.26 31212016 3:37:59PM Page 15 COMPASS 5000.1 Build 61 b BP rrIFIN p Final Survey Report BAKER HUGHES Company: Norm America - ALASKA - BP Local Coordinate Reference: Well 16-15 Project: Prudhoe Bay ND Reference: orkb 70.00ustt She: PB DS 16 MD Reference: orkb (rt 70.00usR WON: 16-15 North Reference: True WN16ore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM RSK- Alaska PROD -ANCP7 Survey MD Inc AM (azimuth) No 1VDSS WS EIW Nothing EaMing DLag V. Sec I -M l°I 19 (95111 (uefq IaeM (uefy (uaR) (uslq (°1100esfy lusty 11,110.23 84.99 52.51 8,933.25 8,863.25 3,836.93 -3,426.15 5,933,248.522 715,744.864 35.11 5,069.81 11,140.07 87.14 61.87 8,935.30 8,865.30 3,853.04 -3,401.16 5,933,265.349 715,769.377 32.11 5,070.21 11,170.25 88.43 72.39 8,936.47 8,866.47 3,864.74 -3,373.41 5,933,277.852 715,796.772 35.09 5,065.42 11,200.28 92.76 82.08 8,936.15 8,866.15 3,871.37 3,344.17 5,933,285.324 715,825.810 35.33 5,055.53 11,230.42 93.75 93.05 8,934.44 8,864.44 3,872.65 3,314.15 5,933,287.473 715,855.776 36.49 5,040.70 11,260.19 94.88 103.91 8,932.19 8,862.19 3,868.28 3,284.83 5,933,283.958 715,885.206 36.57 5,021.45 11,280.40 96.58 110.64 8,930.17 8,860.17 3,862.31 -3,265.64 5,933,278.552 715,904.561 34.18 5,006.22 11,300.40 97.32 113.45 8,927.75 8,857.75 3,864.86 -3,247.24 5,933,271.639 715,923.168 14.43 4,990.15 11,330.20 99.69 110.07 8,923.34 8,853.34 3,843.94 -3,219.88 5,933,261.513 715,950.838 13.75 4,966.37 11,360.50 101.43 106.29 8,917.79 8,847.79 3,834.64 -3,191.59 5,933,253.044 715,979.387 13.54 4,943.49 11,390.31 102.97 102.83 8,911.49 8,841.49 3,827.32 -3,163.39 5,933,246.541 716,007.781 12.47 4,922.33 11,410.28 103.63 100.13 8,906.89 8,836.89 3,823.45 -3,144.35 5,933,243.227 716,026.928 13.57 4,908.95 11,430.28 103.79 97.44 8,902.15 8,832.15 3,820.48 -3,125.15 5,933,240.819 716,046.206 13.09 4,896.26 11,460.51 102.69 93.34 8,895.22 8,825.22 3,817.72 -3,095.86 5,933,238.910 716,075.561 13.69 4,878.39 11,490.68 100.90 87.69 81889.05 8,819.05 3,817.46 -3,066.34 5,933,239.506 716,105.073 19.27 4,862.51 11,520.63 100.40 83.90 8,883.52 8,813.52 3,819.62 3,036.99 5,933,242.516 716,134.345 12.55 4,848.78 11,550.56 100.71 79.09 8,878.03 8,608.03 3,823.97 3,007.90 5,933,247.708 716,163.296 15.83 4,837.04 11,580.43 100.22 74.81 8,872.60 8,802.60 3,830.60 -2,979.29 5,933,255.168 716,191.688 14.19 4,827.50 11,610.32 101.50 69.60 8,866.97 8,796.97 3,839.56 -2,951.35 5,933,264.940 716,219.364 17.65 4,820.29 11,640.51 98.81 65.97 8,861.64 8,791.64 3,850.80 -2,923.85 5,933,276.969 716,246,528 14.81 4,815.23 11,650.00 97.25 65.10 8,660.32 8,790.32 3,854.69 -2,915.30 5,933,281.107 716,254.963 18.77 4,813.99 KOP Billet 11,680.11 92.33 69.10 8,857.80 8,787.80 3,866.36 -2,887.67 5,933,293.570 716,282.239 21.02 4,809.24 11,710.26 93.60 64.45 8,856.24 8,786.24 3,878.23 -2,860.01 5,933,306.237 716,309.544 15.97 4,804.63 11,740.26 92.33 58.37 8,854.69 3,784.69 3,892.56 -2,833.71 5,933,321.324 716,335.408 20.68 4,802.84 11,770.28 90.00 53.29 8,854.08 8,784.08 3,909.41 -2,808.89 5,933,338.888 716,359.730 18.61 4,803.97 11,800.36 90.21 46.68 8,854.02 8,784.02 3,928.74 -2,785.87 5,933,358.878 716,382.183 21.99 4,808.15 31212016 3:37:59PM Page 16 COMPASS 5000.1 Build 61 BP Final Survey Report Company: North America -ALASKA -BP Local Coordinate Reference: Well 16-15 Project: Prudhoe Bay ND Reference: orkb @ 70.00usD Site: PB DS 16 MO Reference: orkb @ 70.00usft Well: 16.15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM R5K-Alaska PROD -ANCP7 I/.Fag HIR UM" Survey MD Inc AN (azimuth) TVD WDSS NIS ENV Northing East!" DLeg V. Sec (usft( 1°I P) (usft) (ust) (usto lusto gusto ("to P1100usf4 (usfo 11,830.60 90.25 41.18 6,853.90 8,783.90 3,950.51 -2,764.90 5,933,381.247 716,402.512 18.19 4,815.48 11,860.32 89.36 36.46 8,854.00 8,784.00 3,973.66 -2,746.27 5,933,404.925 716,420.457 16.16 4,825.24 11,890.47 89.45 30.53 8,854.32 8,784.32 3,995.79 -2,729.64 5,933,430.527 716,436.350 19.67 4,837.72 11,920.35 88.28 25.92 8,854.91 8,784.91 4,025.10 -2,715.52 5,933,457.239 716,449.704 15.91 4,852.55 11,950.18 87.73 20.44 8,855.95 8,785.95 4,052.50 -2,703.79 5,933,484.962 716,460.633 18.45 4,869.55 11,980.38 86.40 15.45 8,857.50 8,787.50 4,081.18 -2,694.50 5,933,513.901 716,469.086 17.08 4,888.95 12,010.50 85.85 9.57 8,859.53 8,789.53 4,110.50 -2,687.99 5,933,543.401 716,474.738 19.56 4,910.36 12,040.38 84.59 4.67 8,862.02 8,792.02 4,140.04 -2,684.30 5,933,573.031 716,477.570 16.88 4,933.44 12,070.37 83.48 358.10 8,865.14 8,795.14 4,169.84 -2,683.58 5,933,602.840 716,477.426 22.10 4,958.33 12,100.40 86.22 351.75 8,867.84 8,797.84 4,199.61 -2,686.22 5,933,632.522 716,473.915 22.95 4,984.98 12,130.28 89.97 346.46 8,868.84 8,798.84 4,228.92 -2,691.86 5,933,661.655 716,467.429 21.64 5,012.82 12,162.84 95.97 340.65 8,867.15 0,797.15 4,260.09 -2,701.05 5,933,692.534 716,457.341 25.67 5,044.11 12,190.42 97.42 337.10 8,863.93 8,793.93 4,285.63 -2,710.92 5,933,717.783 716,446.735 13.82 5,071.00 12,220.48 100.69 331.86 8,859.20 8,789.20 4,312.41 -2,723.69 5,933,744.177 716,433.186 20.36 5,100.48 12,250.44 103.63 327.10 8,852.88 8,782.88 4,337.63 -2,738.56 5,933,768.957 716,417.599 18.37 5,129.74 12,280.12 106.66 321.84 8,845.13 8,775.13 4,360.94 -2,755.19 5,933,791.772 716,400.297 19.92 5,158.33 12,309.96 108.48 316.19 8,836.11 8,766.11 4,382.41 -2,773.83 5,933,812.688 716,381.040 19.05 5,186.41 12,340.34 108.47 315.16 8,826.48 8,756.48 4,403.02 -2,793.96 5,933,832.707 716,360.318 3.22 5,214.56 12,372.46 107.22 322.77 8,816.63 8,746.63 4,426.07 -2,814.01 5,933,855.161 716,339.608 22.88 5,244.74 12,400.12 105.57 329.25 8,808.81 8,738.81 4,448.06 -2,828.83 5,933,876.711 716,324.157 23.25 5,271.24 12,430.42 100.93 334.29 8,801.87 8,731.87 4,474.04 -2,842.76 5,933,902.269 716,309.478 22.28 5,300.65 12,460.55 97.54 340.98 8,797.03 8,727.03 4,501.52 -2,854.06 5,933,929.413 716,297.386 24.63 5,329.94 12,490.18 91.35 343.24 8,794.73 8,724.73 4,529.62 -2,863.13 5,933,957.235 716,287.507 22.23 5,358.57 12,520.59 85.11 342.41 8,795.67 8,725.67 4,558.64 -2,872.10 5,933,985.986 716,277.697 20.70 5,387.94 12,550.22 79.38 340.99 6,799.67 8,729.67 4,506.51 -2,861.31 5,934,013.568 716,267.680 19.91 5,416.45 12,600.00 79.38 340.99 6,808.84 8,738.84 4,632.77 -2,897.25 5,934,059.343 716,250.407 0.00 5,464.12 Projection to TD 3/2/2016 3:37:59PM Page 17 COMPASS 5000.1 Build 61 BP Final Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Casing Point Measured Measured Vertical Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 16 Well: 16.15 Wellbore: 16-15A Design: 16-15A BP Final Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Casing Point Measured Measured Vertical Casing Noy Depth Depth Diameter Diameter (uslt( (usly Name (te) (in) 2,505.00 2,504.94 13 3/8" 13.375 17.500 10,789.00 8,776.40 9 5/8" 9.625 12.250 Well 16-15 orkb @ 70.00usft orkb @ 70.00usft True Minimum Curvature EDM RSK -Alaska PROD -ANCP1 MAP .a BAKER HUGHES Design Annotations Measured Vertical Local Coordinates Depth Depth aNl-S aEl-W (usRj (usft) (usft) Wall( Comment 11,650.00 8,860.32 3,854.69 -2,915.30 KOP Billet 12,600.00 8,808.84 463277 -2,897.25 Projection to To Approved By: Yosha Ragbirsingh Survey Manager Baker Hughes 3/2/2016 3:37.59PM Page 18 COMPASS 5000.1 Build 61 North America - ALASKA - BP Prudhoe Bay PB DS 16 16-15 16-15APB1 500292147470 Design: 16-15APB1 Final Survey Report 02 March, 2016 we W-- BAKER HUGHES b PB DS 16, TR -10-15 BP NGkI P Site Position: Final Survey Report Northing: BMIR Latitude: 70° 12'15.545 N From: Map MUIMES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 1645 0.00 usR Project: Prudhoe Bay TVD Reference: orkb @ 70.00usR (`) Site: PB DS 16 MD Reference: orkb @ 70.00usR 30.00 Well: 16-15 North Reference: True Wellbore: 16-15APB1 Survey Calculation Method: Minimum Curvature Design: 16-15APBI Database: EDM RSK-Alaska PROD -ANCP1 Nothing: Project Prudhoe Bay, GPB, PRUDHOE BAY 70° 12'35.816 N —] Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Position Uncertainty Geo Datum: NAD 1927 (NADCON CONUS) 39.96 usR Using Well Reference Point 36.69 usR Map Zone: Alaska Zone 04 Usina aeodatic scale factor site PB DS 16, TR -10-15 Audit Notes: Site Position: Northing: 5,927,441.990 usR Latitude: 70° 12'15.545 N From: Map Basting: 718,969.880 usR Longitude: 148° 14'4.567 W Position Uncertainty: 0.00 usR Slat Radius: 0.000 in Grid Convergence: 1.66 ° (`) 30.04 0.00 0.00 30.00 Wall 16-15,16-15 Well Position -NIS 0.00 usR Nothing: 5,929,512.870 usR Latitude: 70° 12'35.816 N -E-W 0.00 usR Easting: 719,280.830 usR Longitude: 148° 13'53.802 W Position Uncertainty 0.00 usR Wellhead Elevation: 39.96 usR Ground Level: 36.69 usR Welihore 16-15APB1 Msgnetks Model Name Sample Date Declination Dip Angle Fold Strength r) r) (nT) BGGM2015 21112016 19.38 81.03 57,552 Design i6-0SAPBt Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,800.00 Vertical Section: Depth From [TVD) aWS -EIAN Direction (MR) (MR) (MR) (`) 30.04 0.00 0.00 30.00 312/2016 3:44:37PM Page 2 COMPASS 5000.1 Build 61 b BP HIM 9f p Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft Site: PB DS 16 MD Reference: orkb @ 70.00us0 Well: 16-15 North Reference: True Wellbore: 16.15AP61 Survey Calculation Method: Minimum Curvature Design: 16-15APB1 Database: EDM R5K-Alaska PROD -ANCP7 Survey Program Date 3/2/2016 From To (usft) (usft) Survey (Wellbore) 100.00 10,800.00 GyroData Gyro (16-15) 10,820.00 12,660.63 CTK MWD 4-1/4"(16-15APB1) Survey Tool Name GVD-CT-CMS MWD Description Gyrodaur cont.casing m/s MWD - Standard MD Ire AN(srlmuM) TVD TVDSS WS ENV Northing Easting DLeg (uslp rl 1°1 (sell) (usft) (usll) (us111 tmfo (usft) r1100=fd 30.04 0.00 0.00 30.04 -39.96 0.00 0.00 5,929,512.870 719,280.830 0.00 100.00 0.21 282.32 100.00 30.00 0.03 -0.13 5,929,512.894 719,280.704 0.30 200.00 0.38 258.69 200.00 130.00 0.00 -0.63 5,929,512.853 719,280.201 0.21 300.00 0.32 247.60 300.00 230.00 -0.17 -1.21 5,929,512.665 719.279.623 0.09 400.00 0.55 227.06 399.99 329.99 -0.60 -1.82 5,929,512.214 719,279.026 0.27 500.00 0.47 216.10 499.99 429.99 -1.26 -2.42 5,929,511.538 719,278.452 0.13 600.00 0.49 165.33 599.99 529.99 -2.01 -2.55 5,929,510.790 719,278.341 0.41 700.00 0.52 148.46 699.98 629.98 -2.81 -2.20 5,929,510.000 719,278.709 0.15 800.00 0.37 155.20 799.98 729.98 -3.49 -1.83 5,929,509.331 719,279.102 0.16 900.00 0.53 144.01 899.98 829.98 4.15 -1.42 5,929,508.676 719,279.528 0.18 1,000.00 0.52 137.07 999.97 929.97 4.86 -0.84 5,929,507.987 719,280.129 0.06 1,100.00 0.38 145.44 1,099.97 1,029.97 -5.47 -0.35 5,929,507.396 719,280.644 0.15 1,200.00 0.43 102.25 1,199.97 1,129.97 5.82 0.21 5,929,507.060 719,281.209 0.30 1,300.00 0.48 85.93 1,299.96 1,229.96 -5.87 0.99 5,929,5D7.033 719,281.994 0.14 1,400.00 0.43 79.70 1,399.96 1,329.96 -5.77 1.78 5,929,507.152 719,282.778 0.07 1,500.00 0.28 95.19 1,499.96 1,429.96 5.73 2.39 5,929,507.215 719,283.389 0.18 1,600.00 0.41 81.98 1,599.96 1,529.96 -5.70 2.99 5,929,507.260 719,283.986 0.15 1,700.00 0.34 111.60 1,699.96 1,629.96 -5.76 3.62 5,929,507.219 719,284.617 0.20 1,800.00 0.19 41.87 1,799.95 1,729.95 -5.74 4.01 5,929,507.245 719,285.003 0.33 1,900.00 0.34 70.74 1,899.95 1,829.95 -5.52 4.40 5,929,507.477 719,285.387 0.20 2,000.00 0.48 44.16 1,999.95 1,929.95 -5.12 4.97 5,929,507.892 719,285.947 0.23 V. Sac (aslt) 0.00 -0.04 -0.31 -0.75 -1.43 -2.30 -3.01 -3.53 -3.94 4.31 4.63 4.91 4.93 4.59 4.11 -3.76 -3.44 -3.18 -2.97 -2.58 -1.95 3/2/2016 3:44:37PM Page 3 COMPASS 5000.1 Build 61 b BP FGRI P Final Survey Report BAKER HUGM Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay ND Reference: orkb @ 70.00usft She: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15APB1 Survey Calculation Method: Minimum Curvature Design: 16.15AP61 Database: EDM RSK- Alaska PROD -ANCPI Survey MD Inc Azi (azimuth) TVD NDSB NIS ENV Northing Easting DLeg V. Sec (usR) (°) (°) (MR) (usR) (usR) (uaR) (usR) (usR) (°/100usR) Wit) 2100.00 0.65 55.61 2,099.95 2,029.95 4.50 5.73 5,929,508.535 719,286.689 0.20 -1.03 2,200.00 0.40 35.31 2,199.94 2,129.94 -3.90 6.40 5,929,509.159 719,287.341 0.31 -0.18 2,300.00 0.29 40.88 2,299.94 2,229.94 -3.42 6.77 5,929,509.646 719,287.694 0.11 0.42 2,400.00 0.15 74.70 2,399.94 2,329.94 -3.20 7.06 5,929,509.880 719,287.979 0.19 0.76 2,500.00 0.22 127.96 2,499.94 2,429.94 -3.28 7.34 5,929,509.805 719,288.259 0.18 0.83 2,600.00 0.07 231.14 2,599.94 2,529.94 -3.44 7.44 5,929,509.651 719,288.368 0.25 0.74 2,700.00 0.19 104.55 2,699.94 2,629.94 -3.52 7.55 5,929,509.575 719,288.483 0.24 0.73 2,800.00 1.41 327.64 2,799.93 2,729.93 -2.52 7.06 5,929,510.557 719,287.956 1.55 1.35 2,900.00 4.02 310.17 2,899.81 2,829.81 0.78 3.72 5,929,513.760 719,284.524 2.71 2.54 3,000.00 5.00 315.88 2,999.50 2,929.50 6.17 -1.99 5,929,518.981 719,278.658 1.08 4.35 3,100.00 5.48 314.41 3,099.08 3,029.08 12.64 -6.44 5,929525.261 719,272.028 0.50 6.73 3,200.00 7.30 328.59 3,198.46 3,128.46 21.41 -15.16 5,929,533.826 719,265.054 2.40 10.96 3,300.00 9.88 316.02 3,297.34 3,227.34 33.01 -24.43 5,929,545.151 719,255.451 3.18 16.37 3,325.00 10.78 312.78 3,321.93 3,251.93 36.14 -27.64 5,929,548.187 719,252.156 4.28 17.48 3,350.00 11.32 309.68 3,346.47 3,276.47 39.29 -31.24 5,929,551.236 719,248.461 3.21 18.41 3,375.00 11.95 308.44 3,370.96 3,300.96 42.47 -35.16 5,929,554.296 719,244.455 2.71 19.20 3,400.00 12.62 307.67 3,395.39 3,325.39 45.75 -39.35 5,929,557.451 719,240.173 2.76 19.94 3,425.00 13.13 307.86 3,419.76 3,349.76 49.16 43.75 5,929,560.734 719,235.672 2.05 20.70 3,450.00 13.50 307.84 3,444.08 3,374.08 52.69 48.30 5,929,564.133 719,231.026 1.48 21.48 3,475.00 13.77 307.93 3,468.38 3,398.38 56.31 -52.95 5,929,567.615 719,226.271 1.08 22.29 3,500.00 14.11 308.18 3,492.64 3,422.64 60.02 -57.69 5,929,571.188 719,221.424 1.38 23.13 3,525.00 14.43 308.46 3,516.87 3,446.87 63.84 -62.53 5,929,574.867 719,216.480 1.31 24.03 3,550.00 14.71 308.80 3,541.07 3,471.D7 67.77 -67.44 5,929,578.649 719,211.456 1.17 24.97 3,575.00 14.97 309.16 3,565.23 3,495.23 71.80 -72.42 5,929,582.530 719,206.364 1.10 25.97 3,600.00 15.31 309.30 3,589.37 3,519.37 75.93 -77.47 5,929,586.511 719,201.188 1.37 27.02 3,625.00 15.56 309.64 3,613.46 3,543.46 80.16 -82.61 5,929,590.590 719,195.932 1.06 28.11 3,650.00 15.89 310.06 3,637.53 3,567.53 84.50 -87.81 5,929,594.778 719190.607 1.40 29,27 3/2/2016 3:44:37PM Page 4 COMPASS 5000.1 Build 61 BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft SRe: PB DS 16 MD Reference: orkb Q 70.00usft Well: 16.15 North Reference: True Wellbora: 16.15APB1 Survey Calculation Method: Minimum Curvature Design: 16-15APB1 Database: EDM R5K-Alaska PROD -ANCP1 FORM BAKER Survey MD Inc AN (azimuth) TVD TVDSS WS EN Northing Eas ding DLeg V. Sao (Mfg (°) (`) fust() (uslq (waft) Wall) Will Wall) (-1100"fo (usN) 3,675.00 16.28 310.59 3,661.55 3,591.55 88.98 -93.09 5,929,599.105 719,185.199 1.67 30.51 3,700.00 16.79 310.94 3,685.52 3,615.52 93.63 -98.48 5,929,603.593 719,179.678 2.08 31.84 3,725.00 17.41 311.02 3,709.41 3,639.41 98.45 -104.03 5,929,608.250 719,173.991 2.48 33.24 3,750.00 17.86 311.32 3,733.24 3,663.24 103.43 -109.73 5,929,613.068 719,168.148 1.84 34.71 3,775.00 18.67 311.59 3,756.98 3,686.98 108.62 -115.60 5,929,618.083 719,162.128 3.26 36.27 3,800.00 19.44 311.71 3,780.61 3,710.61 114.04 -121.70 5,929,623.328 719,155.874 3.08 37.92 3,825.00 20.13 311.83 3,804.13 3,734.13 119.68 -128.01 5,929,628.779 719,149.402 2.76 39.64 300.00 20.76 311.98 3,827.56 3,757.56 125.51 -134.51 5,929,634.420 719,142.737 2.53 41.44 3,875.00 21.42 312.21 3,850.88 3,780.88 131.55 -141.19 5,929,640.254 719,135.890 2.66 43.33 3,900.00 22.24 312.59 3,874.09 3,804.09 137.81 -148.05 5,929,646.321 719,128.847 3.33 45.33 3,925.00 23.11 312.88 3,897.16 3,827.16 144.35 -155.13 5,929,652.652 719,121.582 3.51 47.45 3,950.00 23.74 313.11 3,920.09 3,850.09 151.13 -162.40 5,929,659.216 719,114.119 2.55 49.69 3,975.00 24.43 313.32 3,842.92 3,872.92 158.12 -169.83 5,929,665.983 719,106.485 2.78 52.02 4,000.00 25.22 313.47 3,965.61 3,895.61 165.33 -177.46 5,929,672.969 719,D98.652 3.17 54.45 4,025.00 26.03 313.58 3,988.15 3,918.15 172.78 -185.30 5,929,680.184 719,090.600 3.25 56.98 4,050.00 26.74 313.73 4,010.54 3,940.54 180.44 -193.34 5,929,687.616 719,082.343 2.85 59.60 4,075.00 27.46 313.87 4,032.80 3,962.80 188.33 -201.56 5,929,695.257 719,073.899 2.89 62.32 4,100.00 28.23 313.99 4,054.90 3,984.90 196.43 -209.97 5,929,703.110 719,065.258 3.09 65.13 4,125.00 29.11 314.05 4,076.84 4,D06.84 204.76 -218.59 5,929,711.191 719,056.395 3.52 68.03 4,150.00 30.00 314.D7 4,098.59 4,028.59 213.34 -227.45 5,929,719.505 719,047.289 3.56 71.03 4,175.00 30.84 314.08 4,120.14 4,050.14 222.14 -236.55 5,929,728.042 719,037.943 3.36 74.11 4,200.00 31.75 314.16 4,141.51 4,D71.51 231.18 -245.87 5,929,736.807 719,028.363 3.64 77.28 4,225.00 32.66 314.22 4,162.66 4,D92.66 240.47 -255.42 5,929,745.812 719,018.544 3.64 80.54 4,250.00 33.56 314.40 4,183.60 4,113.60 250.01 -265.19 5,929,755.064 719,08.500 3.62 83.92 4,275.00 34.35 314.60 4,204.34 4,134.34 259.80 -275.15 5,929,764.557 718,998.261 3.19 87.42 4,300.00 34.97 314.76 4,224.90 4,154.90 269.80 -285.26 5,929,774.256 718,987.866 2.51 91.02 4,325.00 35.46 314.88 4,245.33 4,175.33 279.96 -295.49 5,929,784.116 718,977.350 1.98 94.71 3/2/2016 3: 44.37PM Page 5 COMPASS 5000.1 Build 61 b BP WeAke p Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usfl Site: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: Two Wellbore: 16-15APBI Survey Calculation Method: Minimum Curvatura Design: 16-15APB1 Database: EDM RSK-Alaska PROD-ANCP1 Survey MD Inc Azl(azimutl) TVD TVDSS WS EIW Northing Board" DLP V. Sic lusf4 PI 1% (usft) IwRj IwRj (usft) Iwfq 1111,51ftj (°1109-11) Iwiq 4,350.00 35.94 315.04 4,265.63 4,195.63 290.27 -305.81 5,929,794.120 718,966.733 1.96 98.47 4,375.00 36.56 315.18 4,285.79 4,215.79 300.74 -316.24 5,929,804.285 718,956.001 2.50 102.33 4,400.00 37.36 315.30 4,305.76 4,235.76 311.41 -326.83 5,929,814.646 718,945.112 3.21 106.28 4,425.00 38.15 315.28 4,325.53 4,255.53 322.29 -337.60 5,929,825.207 718,934.033 3.16 110.31 4,450.00 39.16 315.25 4,345.05 4,275.05 333.38 -348.59 5,929,835.975 718,922.725 4.04 114.42 4,475.00 40.55 315.43 4,364.24 4,294.24 344.78 -359.85 5,929,847.039 718,911.139 5.58 118.66 4,500.00 42.00 315.92 4,383.03 4,313.03 356.58 -371.37 5,929,858.497 718,899.279 5.94 123.12 4,525.00 43.24 316.08 4,401.43 4,331.43 368.75 -383.13 5,929,870.327 718,887.172 4.98 127.79 4,550.00 44.32 316.18 4,419.48 4,349.48 381.22 -395.12 5,929,882.443 718,874.828 4.33 132.59 4,575.00 44.94 316.25 4,437.27 4,367.27 393.90 -407.27 5,929,894.764 718,862.313 2.49 137.50 4,600.00 45.24 316.28 4,454.92 4,364.92 406.70 419.51 5,929,907.195 718,849.707 1.20 142.45 4,625.00 45.49 316.27 4,472.48 4,402.48 419.55 431.81 5,929,919.688 718,837.043 1.00 147.44 4,650.00 45.73 316.28 4,489.97 4,419.97 43246 444.15 5,929,932.234 718,824.326 0.96 152.45 4,675.00 45.98 316.30 4,507.39 4,437.39 445.43 456.55 5,929,944.835 718,811.559 1.00 157.48 4,700.00 46.02 316.46 4,524.75 4,454.75 458.45 465.96 5,929,957.488 718,798.780 0.49 162.55 4,725.00 46.08 316.57 4,542.10 4,472.10 471.51 481.34 5,929,970.181 718,786.021 0.40 167.67 4,750.00 46.19 316.63 4,559.43 4,489.43 484.60 493.73 5,929,982.911 718,773.262 0.47 172.82 4,775.00 46.28 316.70 4,576.72 4,506.72 497.74 -506.12 5,929,995.678 718,760.496 0.41 177.99 4,800.00 46.31 316.73 4,593.99 4,523.99 510.69 -518.51 5,930,008.468 718,747.729 0.15 183.19 4,825.00 46.46 316.71 4,611.24 4,541.24 524.07 -530.92 5,930,021.278 718,734.944 0.60 188.40 4,850.00 46.69 316.76 4,628.42 4,558.42 537.29 -543.36 5,930,034.132 718,722.121 0.93 193.63 4,875.00 46.78 316.83 4,645.56 4,575.56 550.56 -555.82 5,930,047.034 718,709.279 0.41 198.89 4,900.00 46.83 316.87 4,662.67 4,592.67 563.86 -568.29 5,930,059.962 718,696.434 0.23 204.17 4,925.00 46.98 316.91 4,679.75 4,609.75 577.18 -580.76 5,930,072.921 718,683.577 0.61 209.47 4,950.00 47.02 317.02 4,696.80 4,626.80 590.55 -593.24 5,930,085.917 718,670.717 0.36 214.81 4,975.00 47.16 317.04 4,713.82 4,643.82 603.95 -605.72 5,930,098.946 718,657.853 0.56 220.17 5,000.00 47.34 317.06 4,730.79 4,660.79 617.38 -618.23 5,930,112.014 718,644.960 0.72 225.55 322016 3:44.37PM Page 6 COMPASS 5000.1 Build 61 o BP Final Survey Report Company: North America - ALASKA - BP Local Ca -ordinate Reference: Well 16-15 Project: Prudhoe Bay ND Reference: orkb @ 70.00usft Site: PB DS 16 MD Reference: orkb,@ 70.00usR Well: 16-15 North Reference: True Wellborn: 16-15APB1 Survey Calculation Method; Minimum Curvature Design: 16-15APB1 Database: EDM R5K - Alaska PROD - ANCPi WE Flu BAKER HUGHES Survey MD Inc Ani (azimuth) TVD TVDSS NIS EIW Northing Easting D11.99 V. Sec I -M PI 11 IusM (usm Iwm lusm (usm foam (°HOOusm (usm 5,025.00 47.18 317.18 4,747.76 4,677.76 630.84 -630.73 5,930,125.100 718,632.081 0.73 230.96 5,050.00 46.87 317.40 4,764.80 4,694.80 644.28 -643.13 5,930,138.173 718,619.290 1.40 236.40 5,075.00 46.75 317.66 4,781.91 4,711.91 657.72 -655.44 5,930,151.255 718,606.598 0.90 241.89 5,100.00 46.88 317.89 4,799.02 4,729.02 671.22 -667.69 5,930,169.391 718,593.961 0.85 247.45 5,125.00 47.10 317.97 4,816.07 4,746.07 684.79 -679.94 5,930,177.600 718,581.324 0.91 253.08 5,150.00 47.36 317.99 4,833.05 4,763.05 698.43 692.22 5,930,190.870 718,568.649 1.04 258.74 5,175.00 47.43 318.07 4,849.97 4,779.97 712.11 -704.53 5,930,204.188 718,555.952 0.37 264.44 5,200.00 47.46 318.14 4,866.88 4,796.88 725.82 -716.83 5,930,217.532 718,543.263 0.24 270.16 5,225.00 47.63 318.14 4,883.75 4,813.75 739.55 -729.14 5,930,230.906 718,530.561 0.68 275.90 5,250.00 47.79 318.05 4,900.58 4,830.58 753.32 -741.49 5,930,244.305 718,517.815 0.69 281.65 5,275.00 47.95 317.41 4,917.35 4,847.35 767.04 -753.96 5,930257.658 718,504.951 2.00 287.29 5,300.00 48.11 316.45 4,934.07 4,864.07 780.62 -766.65 5,930,270.859 718,491.870 2.93 292.71 5,325.00 48.36 315.95 4,950.72 4,880.72 794.07 -779.56 5,930,283.937 718,478.579 1.80 297.91 5,350.00 48.65 315.85 4,967.28 4,897.28 807.52 -792.59 5,930,296.999 718,465.163 1.20 303.04 5,375.00 48.90 315.82 4,983.76 4,913.76 821.01 -805.69 5,930,310.100 718,451.677 1.00 305.17 5,400.00 49.02 315.74 5,000.17 4,930.17 834.52 618.84 5,930,323.226 718,438.140 0.54 313.30 5,425.00 49.33 315.76 5,016.52 4,946.52 848.07 -832.04 5,930,336.387 718,424.552 1.24 318.43 5,450.00 49.61 315.75 5,032.76 4,962.76 861.69 645.30 5,930,349.608 718,410.905 1.12 323.59 5,475.00 49.91 315.75 5,048.91 4,978.91 875.36 -858.61 5,930,362.884 718,397.198 1.20 328.77 5,500.00 50.18 315.71 5,064.97 4,994.97 889.08 -871.99 5,930,376.212 718,383.429 1.09 333.97 5,525.00 50.27 315.51 5,080.96 5,010.96 902.81 -885.43 5,930,389.545 718,369.595 0.71 339.14 5,550.00 49.99 314.85 5,096.99 5,026.99 916.42 -898.96 5,930,402.757 718,355.682 2.32 344.16 5,575.00 49.60 314.19 5,113.13 5,043.13 929.81 -912.57 5,930,415.743 718,341.686 2.55 348.95 5,600.00 48.53 313.19 5,129.51 5,059.51 942.85 -926.23 5,930,428.386 718,327.659 5.24 353.42 5,625.00 47.52 312.46 5,146.23 5,076.23 955.49 -939.86 5,930,440.619 718,313.668 4.59 357.55 5,650.00 46.81 312.14 5,163.22 5,093.22 967.82 -953.42 5,930,452.558 718,299.756 2.99 361.45 5,675.00 46.42 312.10 5,180.39 5,110.39 980.01 -966.89 5,930,464.346 718,285.932 1.56 365.27 312/2016 3:44:37PM Page 7 COMPASS 5000.1 Build 61 b BP WS&I P Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb 70.00usft Site: PB DS 16 MO Reference: orkb LID 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15APB1 Survey Calculation Method: Minimum Curvature Design: 16.16APB1 Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc Ari (wilmuth) TVD TVDSS NIS EfW Northing Basting DLeg V. Sac (use) 1°I 1°I lusfq (us1Q (usR) lusrt9 lusty lush) (°1100usfq luefq 5,700.00 46.51 312.07 5,197.61 5,127.61 992.16 -980.34 5,930,476.097 718,272.135 0.37 369.06 5,725.00 46.52 312.18 5,214.82 5,144.82 1,004.32 -993.80 5,930,487.868 718,258.335 0.32 372.87 5,750.00 46.41 312.39 5,232.04 5,162.04 1,016.52 -1,007.20 5,930,499.667 718,244.579 0.75 376.73 5,775.00 46.19 312.67 5,249.31 5,179.31 1,028.74 -1,020.52 5,930,511.492 718,230.911 1.20 380.65 5,800.00 46.06 312.90 5,266.64 5,196.64 1,040.98 -1,033.75 5,930,523.343 718,217.336 0.84 384.64 5,825.00 46.17 312.98 5,283.97 5,213.97 1,053.25 -1,046.94 5,930,535.229 718,203.795 0.50 388.67 5,850.00 46.29 313.01 5,301.26 5,231.26 1,065.56 -1,060.14 5,930,547.151 718,190.239 0.49 392.73 5,875.00 46.28 313.06 5,318.54 5,248.54 1,077.89 -1,073.35 5,930,559.093 718,176.680 0.15 396.81 5,900.00 46.43 313.09 5,335.79 5,265.79 1,090.25 -1,086.57 5,930,571.059 718,163.113 0.61 400.90 5,925.00 46.34 313.14 5,353.04 5,283.04 1,102.62 -1,099.78 5,930,583.040 718,149.547 0.39 405.01 5,950.00 46.15 313.21 5,370.33 5,300.33 1,114.98 -1,112.95 5,930,595.007 718,136.026 0.79 409.12 5,975.00 46.15 313.26 5,387.65 5,317.65 1,127.32 -1,126.08 5,930,606.970 718,122.538 0.14 413.25 6,000.00 46.45 313.28 5,404.92 5,334.92 1,139.71 -1,139.24 5,930,618.970 718,109.024 1.20 417.40 6,025.00 46.21 313.42 5,422.18 5,352.18 1,152.13 -1,152.39 5,930,630.996 718,095.520 1.04 421.57 6,050.00 46.29 313.53 5,439.47 5,369.47 1,164.55 -1,165.50 5,930,643.035 718,082.060 0.45 425.78 6,075.00 46.36 313.76 5,456.73 5,386.73 1,177.03 -1,178.58 5,930,655.129 718,068.620 0.72 430.05 6,100.00 46.33 314.09 5,473.99 5,403.99 1,189.58 -1,181.61 5,930,667.293 718,055.234 0.96 434.40 6,125.00 46.22 314.44 5,491.27 5,421.27 1,202.19 -1,204.55 5,930,679.521 718,041.936 1.10 438.85 6,150.00 46.05 314.78 5,506.60 5,438.60 1,214.85 -1,217.38 5,930,691.801 718,028.743 1.19 443.40 6,175.00 45.97 315.04 5,525.96 5,455.96 1,227.55 -1,230.12 5,930,704.123 718,015.642 0.81 448.03 6,200.00 46.01 315.25 5,543.33 5,473.33 1,240.29 -1,242.80 5,930,716.495 718,002.596 0.62 452.72 6,225.00 46.01 315.46 5,560.69 5,490.69 1,253.09 -1,255.44 5,930,728.919 717,989.590 0.60 457.49 6,250.00 45.96 315.65 5,576.06 5,508.06 1,265.92 -1,268.03 5,930,741.383 717,976.634 0.58 462.31 6,275.00 45.87 315.83 5,595.46 5,525.46 1,278.79 -1,280.56 5,930,753.874 717,963.734 0.63 467.18 6,300.00 45.66 315.98 5,612.90 5,542.90 1,291.65 -1,293.03 5,93D,766.370 717,950.902 0.94 472.09 6,325.00 45.73 316.05 5,630.36 5,560.36 1,304.52 -1,305.45 5,930,778.876 717,938.109 0.34 477.02 6,350.00 45.80 316.13 5,647.60 5,577.80 1,317.43 -1,317.87 5,930,791.414 717,925.318 0.36 481.99 3WO16 3:44:37PM Page 8 COMPASS 5000.1 Build 61 BP Final Survey Report Company: North Amenca- ALASKA -BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay ND Reference: orkb @ 70.00usft Site: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15APB1 Survey Calculation Method: Minimum Curvature Design: 16-15APBI Database: EDM RSK- Alaska PROD -ANCPi Had BAKER HUGHES Survey MD has Azi (azknutr) ND TVDSS NIS ENV Northing Pasting DLsg V. Sec (usfq (°I 1°I (usft) (usfq (lait( (usft) Will (usfq (1100usfq (usftj 6,375.00 45.85 316.23 5,665.22 5,595.22 1,330.36 -1,330.29 5,930,803.985 717,912.533 0.35 486.99 6,400.00 46.00 316.33 5,682.61 5,612.61 1,343.34 -1,342.70 5,930,816.599 717,899.749 0.67 492.02 6,425.00 46.32 316.42 5,699.93 5,629.93 1,356.40 -1,355.14 5,930,829.284 717,886.935 1.31 497.10 6,450.00 46.66 316.52 5,717.14 5,647.14 1,369.54 -1,367.63 5,930,842.061 717,874.071 1.39 502.24 6,475.00 47.00 316.68 5,734.24 5,664.24 1,382.79 -1,380.16 5,930,854.939 717,861.165 1.44 507.45 6,500.00 47.30 316.76 5,751.24 5,681.24 1,396.13 -1,392.72 5,930,867.911 717,848.218 1.22 512.73 6,525.00 47.63 316.85 5,768.15 5,698.15 1,409.56 -1,405.33 5,930,880.968 717,835.224 1.35 518.05 6,550.00 47.95 316.96 5,784.94 5,714.94 1,423.09 -1,417.98 5,930,894.116 717,822.187 1.32 523.44 6,575.00 48.23 317.12 5,801.64 5,731.64 1,436.70 -1,430.86 5,930,907.358 717,809.118 1.22 528.89 6,600.00 48.54 317.28 5,818.24 5,748.24 1,450.42 -1,443.36 5,930,920.696 717,796.027 1.33 534.42 6,625.00 48.93 317.51 5,834.73 5,764.73 1,464.25 -1,456.08 5,930,934.152 717,782.910 1.71 540.03 6,650.00 49.38 317.61 5,851.08 5,781.08 1,478.20 -1,468.84 5,930,947.732 717,769.749 1.83 545.74 6,675.00 49.73 317.69 5,867.30 5,797.30 1,492.26 -1,481.66 5,930,961.414 717,756.530 1.42 551.51 6,700.00 49.84 317.76 5,883.44 5,813.44 1,506.39 -1,494.50 5,930,975.160 717,743.284 0.49 557.32 6,725.00 49.76 317.82 5,899.58 5,829.58 1,520.53 -1,507.33 5,930,988.924 717,730.050 0.37 563.15 6,750.00 49.90 317.79 5,915.71 5,845.71 1,534.69 -1,520.16 5,931,002.698 717,716.814 0.57 569.00 6,775.00 49.97 317.74 5,931.80 5,861.80 1,548.85 -1,533.02 5,931,016.484 717,703.548 0.32 574.83 6,800.00 49.89 317.70 5,947.89 5,877.89 1,563.01 -1,545.89 5,931,030.258 717,690.273 0.34 580.66 6,825.00 49.66 317.66 5,964.03 5,894.03 1,577.12 -1,558.74 5,931,043.992 717,677.017 0.93 586.45 6,650.00 49.48 317.61 5,980.25 5,910.25 1,591.18 -1,571.57 5,931,057.673 717,663.792 0.74 592.22 6,875.00 49.42 317.55 5,996.50 5,926.50 1,605.20 -1,584.38 5,931,071.318 717,650.577 0.30 597.96 6,900.00 48.94 317.42 6,012.84 5,942.84 1,619.15 -1,597.17 5,931,084.886 717,637.393 1.96 603.64 6,925.00 48.93 317.37 6,029.27 5,959.27 1,633.02 -1,609.93 5,931,098.382 717,624.236 0.16 609.28 6,950.00 48.78 317.35 6,045.71 5,975.71 1,646.87 -1,622.68 5,931,111.864 717,611.087 0.60 614.89 6,975.00 48.61 317.31 6,062.22 5,992.22 1,660.68 -1,635.41 5,931,125.287 717,597.963 0.69 620.49 7,000.00 48.52 317.26 6,078.76 6,008.76 1,674.45 -1,648.12 5,931,138.682 717,584.855 0.39 626.06 7,025.00 48.56 317.22 6,095.31 6,025.31 1,688.21 -1,660.84 5,931,152.062 717,571.742 0.20 631.61 322016 3..44:37PM Page 9 COMPASS 5000.1 Build 61 BP Final Survey Report Company: North America - ALASKA - BP Local Coordinate Reference: Well 16-15 Project: Prudhoe Bay ND Reference: orkh @ 70.00usft Site: PB DS 16 MD Reference: orkh @ 70.00usft Wall: 16-15 North Reference: True Wellbore: 16-15APBI Survey Calculation Method: Minimum Curvature Design: 16-15APBI Database: EDM R5K-Alaska PROD -ANCPI Survey WEFS2 BAXM HUGM MD Ire: Azi (azimuth) TVD TVDSS WS ENy Northing Essting DLeg V. Sao lusft) M PI (usR) lust" Ivry lusrt) just" (Mry 1^1100ueft) (usft) 7,050.00 48.62 317.23 6,111.85 6,041.85 1,701.97 -1,673.58 5,931,165.449 717,558.615 0.24 637.16 7,075.00 48.59 317.22 6,128.38 6,058.38 1,715.74 -106.31 5,931,178.839 717,545.484 0.12 642.72 7,100.00 48.48 317.23 6,144.93 6,074.93 1,729.49 -1,699.04 5,931,192.214 717,532.368 0.44 648.26 7,125.00 48.41 317.28 6,161.52 6,091.52 1,743.23 -1,711.73 5,931,205.578 717,519.278 0.32 653.81 7,150.00 48.38 317.37 6,178.12 6,108.12 1,756.97 -1,724.40 5,931,218.947 717,506.213 0.29 659.38 7,175.00 48.35 317.45 6,194.73 6,124.73 1,770.73 -1,737.05 5,931,232.329 717,493.175 0.27 664.97 7,200.00 48.23 317.51 6,211.36 6,141.36 1,784.48 -1,749.66 5,931,245.712 717,480.168 0.51 670.58 7,225.00 48.10 317.59 6,228.04 6,158.04 1,798.23 -1,762.23 5,931,259.085 717,467.203 0.57 676.19 7,250.00 47.95 317.64 6,244.76 6,174.76 1,811.85 -1,774.76 5,931,272.443 717,454.281 0.62 681.82 7,275.00 47.84 317.69 6,261.52 6,191.52 1,825.66 -1,787.25 5,931,285.784 717,441.397 0.46 687.44 7,300.00 47.74 317.74 6,278.31 6,208.31 1,839.36 -1,799.71 5,931,299.115 717,428.547 0.43 693.08 7,325.00 47.62 317.78 6,295.15 6,226.15 1,853.05 -1,812.14 5,931,312.433 717,415.729 0.49 698.72 7,350.00 47.45 317.83 6,312.02 6,242.02 1,866.71 -1,824.53 5,931,325.730 717,402.951 0.70 704.36 7,375.00 47.38 317.84 6,328.94 6,258.94 1,880.36 -1,836.88 5,931,339.009 717,390.205 0.28 709.89 7,400.00 47.36 317.79 6,345.87 6,275.87 1,893.98 -1,849.23 5,931,352.273 717,377.463 0.17 715.62 7,425.00 47.32 317.79 6,362.81 6,292.81 1,907.60 -1,861.59 5,931,366.525 717,364.721 0.16 721.24 7,450.00 47.22 317.81 6,379.78 6,309.78 1,921.21 -1,873.92 5,931,378.765 717,351.997 0.40 726.85 7,475.00 47.05 317.79 6,396.78 6,326.78 1,934.78 -1,886.23 5,931,391.975 717,339.300 0.68 732.45 7,500.00 46.77 317.76 6,413.86 6,343.86 1,948.30 -1,898.50 5,931,405.132 717,326.643 1.12 738.03 7,525.00 46.76 317.78 6,430.99 6,360.99 1,961.79 -1,910.74 5,931,418.257 717,314.016 0.07 743.59 7,550.00 46.69 317.73 6,448.13 6,378.13 1,975.26 -1,922.98 5,931,431.370 717,301.393 0.32 749.14 7,575.00 46.56 317.65 6,465.29 6,395.29 1,986.70 -1,935.21 5,931,444.447 717,288.777 0.57 754.66 7,600.00 46.43 317.58 6,482.51 6,412.51 2,002.09 -1,947.43 5,931,457.479 717,276.170 0.56 760.15 7,625.00 46.34 317.50 6,499.75 6,429.75 2,015.45 -1,959.65 5,931,470.471 717,263.569 0.43 765.60 7,650.00 46.17 317.40 6,517.04 6,447.04 2,026.75 -1,971.87 5,931,483.415 717,250.975 0.74 771.02 7,675.00 45.99 317.29 6,534.38 6,464.38 2,041.99 -1,984.07 5,931,496,298 717,238.395 0.79 776.39 7,700.00 45.84 317.18 6,551.77 6,481.77 2,055.18 -1.996.26 5,931,509.122 717,225.824 0.68 781.71 3/212016 3:44: 37PM Page 10 COMPASS 5000.1 Build 61 b BP FrIas P Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft Site: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15APBI Survey Calculation Method: Minimum Curvature Design: 16-15APB1 Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Its: Art lazinuthl TVD TVDSS WS PJW Northing Eas0ng DLag V. Sec Iuelll PI 17 Ism I -M I6sIll Iusfo Willi Iles/ll I111001,18fa (-to 7,725.00 45.83 317.06 6,569.19 6,499.19 2,068.32 -2,008.46 5,931,521.903 717,213.245 0.35 786.89 7,750.00 45.79 316.90 6,586.62 6,516.62 2,081.43 -2,020.69 5,931,534.647 717,200.641 0.49 792.22 7,775.00 45.61 316.71 6,604.08 6,534.08 2,094.47 -2,032.94 5,931,547.329 717,188.021 0.90 797.39 7,800.00 45.48 316.54 6,621.58 6,551.58 2,107.44 -2,045.20 5,931,559.939 717,175.394 0.71 802.50 7,825.00 45.21 316.39 6,639.16 6,569.16 2,120.33 -2,057.45 5,931,572.469 717,162.776 1.16 807.54 7,850.00 44.99 316.21 6,656.80 6,586.80 2,133.14 -2,069.68 5,931,584.911 717,150.176 1.02 812.51 7,875.00 45.01 316.02 6,674.48 6,604.48 2,145.88 -2,081.93 5,931,597.290 717,137.557 0.54 817.42 7,900.00 45.11 315.87 6,692.14 6,622.14 2,158.59 -2,094.24 5,931,609.644 717,124.889 0.58 822.28 7,925.00 45.07 315.76 6,709.79 6,639.79 2,171.29 -2,106.58 5,931,621.977 717,112.186 0.35 827.10 7,950.00 44.84 315.68 6,727.48 6,657.48 2,183.94 -2,118.91 5,931,634.259 717,099.492 0.95 831.89 7,975.00 44.78 315.59 6,745.22 6,675.22 2,196.53 -2,131.23 5,931,646.491 717,086.812 0.35 836.64 8,000.00 44.72 315.50 6,762.97 6,692.97 2,209.10 -2,143.56 5,931,658.690 717,074.127 0.35 841,35 8,025.00 44.55 315.40 6,780.76 6,710.76 2,221.61 -2,155.88 5,931,670.844 717,061.447 0.74 846.03 8,050.00 44.35 315.31 6,798.61 6,728.61 2,234.07 -2,166.18 5,931,682.937 717,048.789 0.84 850.67 8,075.00 44.21 315.27 6,816.51 6,746.51 2,246.47 -2,180.46 5,931,694.979 717,036.155 0.57 855.27 8,100.00 44.18 315.19 6,834.43 6,764.43 2,258.85 -2,192.74 5,931,706.989 717,023.528 0.25 859.85 8,125.00 44.16 315.15 6,852.36 6,782.36 2,271.20 -2,205.02 5,931,718.981 717,010.894 0.14 864.41 8,150.00 44.01 315.05 6,870.32 6,800.32 2,283.52 -2,217.29 5,931,730.939 716,998.264 0.66 868.94 8,175.00 43.76 315.02 6,888.34 6,818.34 2,295.78 -2,229.54 5,931,742.839 716,985.667 1.00 873.44 8,200.00 43.54 315.04 6,906.43 6,836.43 2,307.99 -2,241.74 5,931,754.688 716,973.123 0.88 877.91 8,225.00 43.47 315.03 6,924.56 6,854.56 2,320.17 -2,253.90 5,931,766.506 716,960.613 0.28 882.37 8,250.00 43.45 314.95 6,942.71 6,872.71 2,332.32 -2,266.06 5,931,778.305 716,948.104 0.23 886.82 8,275.00 43.22 314.93 6,960.89 6,890.89 2,344.44 -2,278.20 5,931,790.065 716,935.613 0.92 891.25 8,300.00 42.98 314.90 6,979.14 6,909.14 2,356.50 -2,290.30 5,931,801.769 716,923.172 0.96 895.64 8,325.00 42.84 314.85 6,997.46 6,927.46 2,368.51 -2,302.36 5,931,813.423 716,910.767 0.58 900,01 8,350.00 42.68 314.62 7,015.81 6,945.81 2,380.48 -2,314.40 5,931,825.035 716,898.389 0.65 904.36 8,375.00 42.44 314.80 7,034.22 6,964.22 2,392.40 -2,326.40 5,931,836.598 716,886.052 0.96 908.68 312/2016 3:44.37PM Page 11 COMPASS 5000.1 Build 61 BP //.ut\ by Final Survey Report EEE: HUMES Company: North America - ALASKA - BP Local Co-ordinate Referenu: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft She: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15APB1 Survey Calculation Method: Minimum Curvature Design: 16-15APB1 Database: EDM RSK-Alaska PROD -ANCP1 Survy MD Inc Azi(azimuth) ND TVDSS WS ENV Northing Easting DLeg V. Sac (usf9 Pj P) lustq (usftj (usft) (usft) Wall) (usft( (.1100us IQ (usro 8,400.00 42.20 314.74 7,052.71 6,982.71 2,404.25 -2,338.34 5,931,848.099 716,873.764 0.97 912.97 8,425.00 41.87 314.73 7,071.28 7,001.28 2,416.03 -2,350.24 5,931,859.530 716,861.536 1.32 917.23 8,450.00 41.77 314.76 7,089.91 7,019.91 2,427.77 -2,362.08 5,931,870.916 716,849.361 0.41 921.47 8,475.00 41.67 314.79 7,108.57 7,038.57 2,439.49 -2,373.89 5,931,882.285 716,837.216 0.41 925.71 8,500.00 41.42 314.78 7,127.28 7,057.28 2,451.17 -2,385.65 5,931,893.618 716,825.114 1.00 929.95 8,525.00 41.05 314.68 7,146.08 7,076.08 2,462.76 -2,397.36 5,931,904.870 716,813.076 1.50 934.14 8,550.00 40.98 314.60 7,164.94 7,094.94 2,474.29 -2,409.03 5,931,916.D53 716,801.073 0.35 938.28 8,575.00 40.94 314.47 7,183.82 7,113.82 2,485.79 -2,420.72 5,931,927.203 716,789.063 0.38 942.39 8,600.00 40.75 314.28 7,202.73 7,132.73 2,497.22 -2,432.40 5,931,938.293 716,777.D60 0.91 946.45 8,625.00 40.45 314.10 7,221.72 7,151.72 2,508.56 -2.444.07 5,931,949.289 716,765.060 1.28 950.44 8,650.00 40.18 313.95 7,240.78 7,170.78 2,519.80 -2,455.70 5,931,960.187 716,753.109 1.15 954.36 8,675.00 40.10 313.83 7,259.89 7,189.89 2,530.97 -2,467.31 5,931,971.018 716,741.175 0.45 958.23 8,700.00 40.27 313.80 7,278.99 7,208.99 2,542.14 -2,478.95 5,931,981.843 716,729.216 0.68 962.08 8,725.00 40.49 313.83 7,298.03 7,228.03 2,553.36 -2,490.64 5,931,992.712 716,717.209 0.88 965.95 8,750.00 40.71 313.89 7,317.02 7,247.02 2,564.63 -2,502.37 5,932,003.639 716,705.157 0.89 969.85 8,775.OD 40.96 314.00 7,335.93 7,265.93 2,575.97 -2,514.14 5,932,014.636 716,693.063 1.04 973.79 8,800.00 41.27 314.05 7,354.77 7,284.77 2,587.40 -2,525.96 5,932,025.712 716,680.916 1.25 977.77 8,825.00 41.64 314.05 7,373.50 7,303.50 2,598.91 -2,537.86 5,932,036.869 716,668.692 1.48 981.79 8,850.00 42.02 314.25 7,392.13 7,322.13 2,610.52 -2,549.82 5,932,048.130 716,656.397 1.61 985.87 8,875.OD 42.19 314.32 7,410.68 7,340.68 2,622.22 -2,561.82 5,932,059.480 716,644.063 0.71 990.00 8,900.00 42.49 314.42 7,429.16 7,359.16 2,634.00 -2,573.86 5,932,070.899 716,631.690 1.23 994.18 8,925.00 42.91 314.59 7,447.53 7,377.53 2,645.88 -2,585.95 5,832,082.427 716,619.260 1.74 998.43 8,950.00 43.26 314.81 7,465.79 7,395.79 2,657.89 -2,598.09 5,932,094.081 716,606.778 1.52 1,002.76 8,975.00 43.43 315.05 7,483.97 7,413.97 2,670.01 -2,610.24 5,932,105.841 716,594.284 0.95 1,007.18 9,000.00 43.63 315.27 7,502.10 7,432.10 2,682.22 -2,622.38 5,932,117.692 716,581.794 1.00 1,011.68 9,025.00 43.91 315.31 7,520.15 7,450.15 2,694.51 -2,634.54 5,932,129.624 716,569.276 1.13 1,016.25 9,050.00 44.08 315.30 7,538.13 7,468.13 2,706.86 -2,646.76 5,932,141.608 716,556.710 0.68 1,020.83 3/2/2016 3:44.37PM Page 12 COMPASS 5000.1 Build 61 BP Final Survey Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay Site: PB DS 16 TVD Reference: orkb @ 70.00ustt Well: 16-15 MD Reference: orkb @ 70.00usR NIS ENV North Reference: True Wellbore: 16-15APB1 Survey Calculation Method: Minimum Curvature Design: 16-15APB1 Database: EDM RSK- Alaska PROD -ANCPI FeA �M ■ NUGNU Survey MD Inc Azl (azimuth) ND TVDSS NIS ENV NoMft Eeetlng DLeg V. Sec Iusfq PI (1 (usm lualry (wtry (u38) (ustry (wiry (wouri Q (ustry 9,075.00 44.35 315.38 7,556.05 7,486.05 2,719.26 -2,659.01 5,932,153.646 716,544.101 1.10 1,025.44 9,100.00 44.71 315.49 7,573.87 7,503.87 2,731.75 -2,671.31 5,932,165.774 716,531.442 1.47 1,030.11 9,125.00 45.03 315.56 7,591.59 7,521.59 2,744.33 -2,683.67 5,932,177.995 716,518.725 1.30 1,034.83 9,150.00 45.24 315.63 7,609.23 7,539.23 2,756.99 -2,696.07 5,932,190.288 716,505.965 0.86 1,039.59 9,175.00 45.37 315.66 7,626.81 7,556.81 2,769.70 -2,708.49 5,932,202.628 716,493.178 0.53 1,D44.38 9,200.00 45.72 315.70 7,644.32 7,574.32 2,782.47 -2,720.96 5,932,215.027 716,480.345 1.40 1,049.21 9,225.00 46.11 315.70 7,661.71 7,591.71 2,795.32 -2,733.50 5,932,227.509 716,467.436 1.56 1,054.07 9,250.00 46.42 315.68 7,679.00 7,609.00 2,808.24 -2,746.12 5,932,240.063 716,454.448 1.24 1,D58.95 9,275.00 46.63 315.70 7,696.20 7,626.20 2,821.23 -2,758.79 5,932,252.670 716,441.404 0.84 1,063.86 9,300.00 46.79 315.75 7,713.34 7,643.34 2,834.26 -2,771.50 5,932,265.325 716,428.328 0.66 9,325.00 47.19 315.78 7,730.39 7,660.39 2,847.35 -2,784.25 5,932,278.046 716,415.201 1.60 1,068.79 1,073.76 9,350.00 47.52 315.81 7,747.33 7,677.33 2,860.54 -2,797.07 5,932,290.850 716,402.003 1.32 1,078.76 9,375.00 47.69 315.84 7,764.18 7,694.18 2,873.78 -2,809.94 5,932,303.712 716,388.759 0.69 1,083.80 9,400.00 47.77 315.84 7,781.00 7,711.00 2,887.05 -2,822.82 5,932,316.603 716,375.491 0.32 1,088.85 9,425.00 47.87 315.82 7,797.79 7,727.79 2,900.34 -2,835.73 5,932,329.510 716,362.203 0.40 1,093.90 9,450.00 48.10 315.76 7,814.52 7,744.52 2,913.65 -2,848.68 5,932,342.442 716,348.871 0.94 1,098.95 9,475.00 48.22 315.67 7,831.20 7,761.20 2,926.98 -2,861.69 5,932,355.391 716,335.485 0.55 1,104.00 9,500.00 48.26 315.60 7,847.85 7,777.85 2,940.32 -2,874.73 5,932,368.338 716,322.064 0.26 1,109.02 9,525.00 48.30 315.51 7,864.48 7,794.48 2,953.64 -2,887.80 5,932,381.274 716,308.617 0.31 1,114.03 9,550.00 48.41 315.40 7,881.10 7,811.10 2,966.95 -2,900.90 5,932,394.202 716,295.132 0.55 1,119.01 9,575.00 48.61 315.29 7,897.66 7,827.66 2,980.27 -2,914.06 5,932,407.135 716,281.589 0.87 1,123.96 9,600.00 48.72 315.27 7,914.17 7,844.17 2,993.61 -2,927.27 5,932,420.084 716,268.000 0.44 1,128.91 9,625.00 48.32 315.30 7,930.73 7,860.73 3,006.92 -2,940.45 5,932,433.D04 716,254.442 1.60 1,133.85 9,650.00 48.07 315.32 7,947.39 7,877.39 3,020.17 -2,953.55 5,932,445.866 716,240.957 1.00 1,138.77 9,675.00 47.96 315.37 7,964.12 7,894.12 3,033.39 -2,966.61 5,932,458.699 716,227.519 0.46 1,143.68 9,700.00 47.86 315.41 7,980.87 7,910.87 3,046.60 -2,979.64 5,932,471.522 716,214.112 0.42 1,148.61 9,725.00 47.62 315.40 7,997.69 7,927.69 3,059.77 -2,992.63 5,932,484.314 716,200.745 0.96 1,153.52 --111. 11 r.I". Page 13 COMPASS 5000.1 Build 61 Elp Final SuBeey Report Company: North America- ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project Prudhoe Bay TVD Reference: orkb @ 70.00usR Site: PB DS 16 MD Reference: orkb @ 70.00usR Well: 16-15 North Reference: True Wellbore: 16-15APB7 Survey Calculation Method: Minimum Curvature Design: 16-15APB1 Database: EDM RSK-Alaska PROD-ANCP1 Survey BAK R •• HUMFJ MD Inc Azi(azimuth) TVD TVDSS WS PJDI Northing Fas0ng DLeg V. Sac (usR) PI 1°I (usR) (ustq justo (undo (usB) (=to (°110owtq (win 9,750.00 47.21 315.37 8.014.60 7,944.60 3,072.88 -3,005.56 5,932,497.036 716,187.443 1.64 1,158.41 9,775.00 47.22 315.30 8,031.58 7,961.58 3,085.92 -3,018.46 5,932,509.705 716,174.173 0.21 1,163.26 9,800.00 47.04 315.26 8,048.59 7,978.59 3,098.94 -3,031.35 5,932,522.343 716,160.908 0.73 1,168.09 9,825.00 46.74 315.30 8,065.68 7,995.68 3,111.91 -3,044.19 5,932,534.933 716,147.695 1.21 1,172.90 9,850.00 46.49 315.29 8,082.85 8,012.85 3,124.83 -3,056.98 5,932,547.469 716,134.545 1.00 1,177.69 9,875.00 46.36 315.18 8,100.08 8,030.08 3,137.68 -3,069.73 5,932,559.952 716,121.423 0.61 1,182.45 9,900.00 46.19 315.18 8,117.36 8,047.36 3,150.50 -3,082.46 5,932,572.391 716,108.322 0.68 1,187.18 9,925.00 45.86 315.31 8,134.72 8,064.72 3,163.28 -3,095.13 5,932,584.793 716,095.290 1.37 1,191.91 9,950.00 45.43 315.44 8,152.20 8,082.20 3,176.00 -3,107.69 5,932,597.145 716,082.370 1.76 1,196.65 9,975.00 45.20 315.55 6,169.78 8,099.78 3,188.67 -3,120.15 5,932,609.454 716,069.548 0.97 1,201.40 10,000.00 45.14 315.65 8,187.40 8,117.40 3,201.34 -3,132.55 5,932,621.755 716,056.781 0.37 1,206.17 10,025.00 45.06 315.75 8,205.05 8,135.05 3,214.02 -3,144.92 5,932,634.064 716,044.051 0.43 1,210.96 10,050.00 44.77 315.82 8,222.76 8,152.76 3,226.67 -3,157.23 5,932,646.352 716,031.380 1.18 1,215.76 10,075.00 44.59 315.96 8,240.53 8,170.53 3,239.29 -3,169.47 5,932,658.612 716,018.784 0.82 1,220.57 10,100.00 44.43 316.06 8,258.36 8,188.36 3,251.90 -3,181.64 5,932,670.862 716,006.251 0.70 1,225.41 10,125.00 44.20 316.28 8,276.25 8,206.25 3,264.50 .3,193.73 5,932,683.104 715,993.796 1.11 1,230.27 10,150.00 43.83 316.61 8,294.23 8,224.23 3,277.09 -3,205.70 5,932,695.340 715,981.466 1.74 1,235.19 10,175.00 43.34 316.98 8,312.34 8,242.34 3,289.65 -3,217.50 5,932,707.554 715,969.307 2.21 1,240.17 10,200.00 42.95 317.33 8,330.58 8,260.58 3,302.18 -3,229.13 5,932,719.745 715,957.323 1.83 1,245.21 10,225.00 42.72 317.85 8,348.91 8,278.91 3,314.73 -3,240.59 5,932,731.956 715,945.500 1.69 1,250.35 10,250.00 42.36 318.31 8,367.33 8,297.33 3,327.31 -3,251.88 5,932,744.199 715,933.848 1.90 1,255.59 10,275.00 41.95 318.77 8,385.86 8,315.86 3,339.88 -3,262.99 5,932,756.444 715,922.379 2.05 1,260.93 10,300.00 41.65 319.30 8,404.50 8,334.50 3,352.47 -3,273.92 5,932,768.704 715,911.094 1.85 1,266.36 10,325.00 41.46 319.88 8,423.20 8,353.20 3,365.10 -3,264.67 5,932,781.015 715,899.980 1.68 1,271.92 10,350.00 41.12 320.40 8,441.99 8,371.99 3,377.76 .1,295.25 5,932,793.367 715,889.042 1.99 1,277.60 10,375.00 40.68 321.02 8,460.88 8,390.88 3,390.43 -3,305.61 5,932,805.728 715,878.313 2.39 1,283.39 10,400.00 40.48 321.35 8,479.87 8,409.87 3,403.10 -3,315.80 5,932,818.098 715,867.756 1.17 1,289.27 3/2/2016 3:44:37PM Page 14 COMPASS 5000.1 Build 61 by BP HF IG • Final Survey Report BA HUIMES Company: North America - ALASKA - BP Local Co-ordinate Reference: waif 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00uae SRO: PB DS 16 MD Reference: orkb Q 70.00usf1 Well: 16-15 North Reference: True Wellbore: 16-15AP131 Survey Calculation Method: Minimum Curvature Design: 16-15APS1 Database: EDM RSK- Alaska PROD -ANCPi Survey MD Inc Azl (azimuth) 1VD TVDSS NIS EIW Northing Eas0ng DI -99 V. Sec (Will" 1°I (°) (usfq (use) (Mfq lusM (use) (use ) (°noousrq lusty 10,425.00 40.38 321.57 8,498.90 8,428.90 3,415.78 -3,325.91 5,932,830.480 715,857.291 0.70 1,295.20 10,450.00 40.29 321.77 8,517.96 8,447.96 3,428.47 -3,335.94 5,932,842.876 715,846.892 0.63 1,301.18 10,475.00 40.22 321.96 8,537.04 8,467.04 3,441.18 -3,345.92 5,932,855.287 715,836.552 0.57 1,307.19 10,500.00 40.29 322.03 8,556.12 8,486.12 3,453.91 3,355.86 5,932,867.722 715,826.240 0.33 1,313.24 10,525.00 40.15 322.29 8,575.20 8,505.20 3,466.66 -3,365.77 5,932,880.177 715,815.971 0.87 1,319.33 10,550.00 40.29 322.47 8,594.29 8,524.29 3,479.45 -3,375.62 5,932,892.671 715,805.750 0.73 1,325.48 10,575.00 40.45 322.65 8,613.34 8,543.34 3,492.30 -3,385.47 5,932,905.236 715,795.537 0.79 1,331.69 10,600.00 40.48 322.86 8,632.36 8,562.36 3,505.22 3,395.29 5,932,917.861 715,785.347 0.56 1,337.97 10,625.00 40.36 323.06 8,651.39 8,581.39 3,518.16 -3,405.05 5,932,930.510 715,775.212 0.71 1,344.29 10,650.00 40.21 323.19 8,670.46 8,600.46 3,531.09 -3,414.75 5,932,943.153 715,765.141 0.69 1,350.64 10,675.00 40.42 323.31 8,689.53 8,619.53 3,544.05 -3,424.43 5,932,955.826 715,755.091 0.90 1,357.02 10,700.00 40.38 323.45 8,708.57 8,638.57 3,557.05 -3,434.09 5,932,968.544 715,745.053 0.40 1,363.45 10,725.00 40.35 323.78 8,727.61 8,657.61 3,570.09 -3,443.70 5,932,981.294 715,735.074 0.86 1,369.94 10,750.00 40.38 324.12 8,746.66 8,676.66 3,583.18 3,453.23 5,932,994.102 715,725.170 0.89 1,376.51 10,775.00 40.36 324.26 8,765.71 8,695.71 3,596.31 3,462.70 5,933,006.953 715,715.319 0.37 1,383.15 10,800.00 39.94 324.33 8,784.82 8,714.82 3,609.40 -3,472.11 5,933,019.763 715,705.535 1.69 1,389.76 TIP 10,820.00 39.56 324.20 8,800.19 8,730.19 3,619.78 -3,479.58 5,933,029.923 715,697.768 1.92 1,395.03 KOP 10,840.01 40.83 326.00 8,815.48 8,745.48 3,630.37 -3,486.96 5,933,040.296 715,690.078 8.58 1,400.51 Interpolated Azimuth 10,870.11 44.12 338.00 8,837.71 8,767.71 3,648.28 -3,496.41 5,933,057.920 715,680.117 29.01 1,411.30 Interpolated Azimuth 10,900.70 52.00 349.00 8,858.18 8,788.18 3,670.06 -3,502.72 5,933,079.502 715,673.179 37.07 1,427.00 Interpolated Azimuth 10,932.01 56.23 2.20 8,876.58 8,806.58 3,695.25 -3,504.58 5,933,104.634 715,670.587 36.69 1,447.89 Interpolated Azimuth 10,960.19 59.08 14.12 8,891.59 8,821.69 3,718.75 -3,501,17 5,933,128.214 715,673.311 37.11 1,469.94 3/212016 3:44:37PM Page 16 COMPASS 5000.1 Build 61 0b BP RAN p Final Survey Report OMER HU MES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usN Site: PB DS 16 MD Reference: orkb @170.00usfl Well: 16-15 North Reference: True Wellbore: 16-15APB1 Survey Calculation Method: Minimum Curvature Design: 16-15APB1 Database: EDM RSK-Alaska PROD -ANCP1 Survey MD Inc AN(Wtmuth) TVD TVDSS WS EIW Northing E-** DLag V. Sao (-ft) )°) (°) (mft) (uafq (wit) (mid" (ust" (-it) (°1100usfq (usf" 10,990.48 62.60 23.14 8,906.47 8,836.47 3,743.76 -3,492.70 5,933,153.459 715,681.051 28.47 1,495.84 11,020.27 70.21 27.87 8,918.39 8,848.39 3,768.36 -3,480.93 5,933,178.387 715,692.102 29.39 1,523.03 11,048.66 79.63 32.98 8,925.78 8,855.78 3,791.94 -3,467.05 5,933,202.368 715,705.295 37.45 1,550.40 11,080.23 83.85 41.99 8,930.32 8,860.32 3,816.69 -3,448.05 5,933,227.659 715,723.566 31.24 1,581.33 11,110.23 84.99 52.51 8,933.25 8,863.25 3,836.93 -3,426.15 5,933,248.522 715,744.864 35.11 1,609.80 11,140.07 87.14 61.87 8,935.30 8,865.30 3,853.04 -3,401.16 5,933,265.349 715,769.377 32.11 1,636.25 11,170.25 88.43 72.39 8,936.47 8,866.47 3,864.74 -3,373.41 5,933,277.852 715,796.772 35.09 1,660.26 11,200.28 92.76 82.08 8,936.15 8,866.15 3,871.37 -3,344.17 5,933,285.324 715,825.810 35.33 1,680.62 11,230.42 93.75 93.05 8,934.44 8,864.44 3,872.65 -3,314.15 5,933,287.473 715,855.776 36.49 1,696.74 11,260.19 94.88 103.91 8,932.19 8,862.19 3,868.28 -3,284.83 5,933,283.958 715,885.206 36.57 1,707.61 11,280.40 96.58 110.64 8,930.17 8,860.17 3,862.31 -3,265.64 5,933,278.552 715,904.561 34.18 1,712.04 11,300.40 97.32 113.45 8,927.75 8,857.75 3,854.86 -3,247.24 5,933,271.639 715,923.168 14.43 1,714.79 11,330.20 99.69 110.07 8,923.34 8,853.34 3,843.94 -3,219.88 5,933,261.513 715,950.838 13.75 1,719.01 11,360.50 101.43 106.29 8,917.79 8,847.79 3,834.64 -3,191.59 5,933,253.044 715,979.387 13.54 1,725.10 11,390.31 102.97 102.83 8,911.49 8,841.49 3,827.32 -3,163.39 5,933,246.541 716,007.781 12.47 1,732.86 11,410.28 103.63 100.13 8,906.89 8,836.89 3,823.45 -3,144.35 5,933,243.227 716,026.928 13.57 1,739.03 11,430.28 103.79 97.44 8,902.15 8,832.15 3,820.48 -3,125.15 5,933,240.819 716,046.206 13.09 1,746.06 11,460.51 102.69 93.34 8,895.22 8,825.22 3,817.72 -3,095.86 5,933,238.910 716,075.561 13.69 1,758.31 11,490.68 100.90 87.69 8,889.05 8,819.05 3,817.46 -3,066.34 5,933,239.506 716,105.073 19.27 1,772.85 11,520.63 100.40 83.90 8,883.52 8,813.52 3,819.62 -3,036.99 5,933,242.516 716,134.345 12.55 1,789.39 11,550.56 100.71 79.09 8,878.03 8,808.03 3,823.97 -3,007.90 5.933,247.708 716,163.296 15.83 1,807.70 11,580.43 100.22 74.81 8,872.60 8,802.80 3,830.60 -2,979.29 5,933,255.168 716,191.698 14.19 1,827.75 11,610.32 101.50 69.60 8,866.97 8,796.97 3,839.56 -2,951.35 5,933,264.940 716,219.364 17.65 1,849.48 11,640.51 98.81 65.97 8,861.64 8,791.64 3,850.60 -2,923.85 5,933,276.969 716,246.528 14.81 1,872.96 11,670.34 93.90 63.26 8,858.34 8,788.34 3,863.51 -2,897.08 5,933,290.448 716,272.918 18.77 1,897.36 11,700.53 91.41 58.14 8,856.94 8,786.94 3,878.26 -2,870.79 5,933,305.958 716,298.765 18.84 1,923.28 11,730.32 90.06 52.41 8,856.56 8,786.56 3,895.22 -2,846.32 5,933,323.622 716,322.733 19.76 1,950.20 3212016 3:44:37PM Page 16 COMPASS 5000.1 Build 61 a a Company Project: Site: Well: Wellbore: Design: Survey North America - ALASKA- BP Prudhoe Bay PB DS 16 16-15 16.15APB1 16-15APB1 BP Final Survey Report Local Ca -ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 16-15 orkb @ 70.00ush orkb C 70.00usft True Minimum Curvature EDM RSK- Alaska PROD -ANCP1 WEitI B NER UGM MD Inc Azi(azimuth) TVD 7VOSS Will EN Northing Easeng DLeg V. Sac Wo P) PI (MM (ustq (sem (Mfq (usR) (usR) (.1100 rsrt( (US114 11,760.42 90.49 46.88 8,856.42 8,786.42 3,914.70 -2,823.39 5,933,343.761 716,345.085 18.43 1,978.54 11,780.60 91.81 42.55 8,856.01 8,786.01 3,929.04 -2,809.20 5,933,358.500 716,358.854 22.43 1,998.05 11,800.47 93.32 38.55 8,855.12 8,785.12 3,944.12 -2,796.30 5,933,373.947 716,371.312 21.50 2,017.56 11,830.60 94.49 33.43 8,853.07 8,783.07 3,968.43 -2,778.64 5,933,398.761 716,388.257 17.39 2,047,44 11,attlas 90.65 29.14 8,851.71 8,781.71 3,994.27 -2,762.94 5,933,425.046 716,403.200 19.00 2,077.67 11,890.84 90.31 23.57 8,851.46 8,781.46 4,021.10 -2,749.64 5,933,452.254 716,415.709 18.63 2,107.56 11,920.74 89.69 17.70 8,851.46 8,781.46 4,049.07 -2,739.11 5,933,480.516 716,425.424 19.74 2,137.05 11,950.52 89.69 9.79 8,851.62 8,781.62 4,077.98 -2.732.04 5,933,509.612 716,431.651 26.56 2,165.61 11,980.76 93.50 3.95 8,850.78 8,780.78 4,107.97 -2,728.43 5,933,539.695 716,434.394 23.05 2,193.39 12,010.92 92.09 356.76 8,849.30 8,779.30 4,138.07 -2,728.24 5,933,569.789 716,433.705 24.27 2,219.56 12,040.82 93.53 352.24 8,847.84 8,777.84 4,167.79 -2,731.10 5,933,599.411 716,429.983 15.85 2,243.86 12,071.04 91.69 346.83 8,846.46 8,776.46 4,197.47 -2,736.58 5,933,628.912 716,423.642 18.89 2,266.82 12,100.81 88.37 339.83 8,846.45 8,776.45 4,225.96 -2,745.12 5,933,657.148 716,414.285 26.02 2,287.23 12,130.46 89.20 333.92 8,847.07 8,777.07 4,253.21 -2,756.75 5,933,684.046 716,401.862 20.12 2,305.01 12,160.66 88.53 327.72 8,847.87 8,777.67 4,279.56 -2,771.47 5,933,708.956 716,386.390 20.65 2,320.48 12,191.10 90.09 324.15 8,848.04 8,778.04 4,3D4.77 -2,788.51 5,933,734.659 716,368.620 12.80 2,333.78 12,221.33 92.03 329.49 8,847.46 8,777.48 4,330.06 -2,805.05 5,933,759.453 716,351.358 18.79 2,347.42 12,250.72 91.75 335.78 8,846.51 8,776.51 4,356.13 -2,818.54 5,933,786.123 716.337.112 21.41 2,363.25 12,281.00 89.88 341.55 8,846.08 8,776.08 4,384.32 -2,829.55 5,933,812.979 716,325.289 20.03 2,382.16 12,310.76 89.66 342.70 8,846.20 8,776.20 4,412.64 -2,838.69 5,933,841.023 716,315.337 3.93 2,402.12 12,340.72 90.89 337.52 8,846.05 8.776.05 4,440.81 -2,848.88 5,933,868.877 716,304.335 17.77 2,421.41 12,370.87 90.55 332.21 8,845.68 8775.68 4,468.09 -2,861.68 5,933,895.775 716,290.748 17.65 2,438.64 12,400.90 89.60 328.10 8,845.64 8,775.64 4,494.13 -2,876.62 5,933,921.371 716,275.057 14.05 2,453.72 12,430.82 83.66 330.54 8,847.39 8,777.39 4,519.80 -2,891.85 5,933,946.589 716,259.085 21.46 2,468.34 12,460.82 78.59 333.18 8,852.02 8,782.02 4,545.93 -2,905.83 5,933,972.295 716,244.355 19.00 2,483.97 12,490.14 71.30 335.40 8,859.63 8,789.63 4,571.41 -2,918.11 5,933,997.414 716,231.339 25.91 2,499.91 12,520.45 64.41 337.70 8,871.05 8,801.05 4,597.15 -2,929.29 5,934,022.810 716,219.420 23.79 2,516.60 3/2)2016 3:44:37PM Page 17 COMPASS 5000.1 Build 61 b BP FiV1a P Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Coordinate Reference: Well 16.15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft She: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15APB1 Survey Calculation Method: Minimum Curvature Design: 16-15APSI Database: EDM RSK- Alaska PROD -ANCP1 Survey Measured vertical Local Coordinates Depth Depth MD (usft) Inc (°) AN (azimuth) 11) ND Will TVDSS (asft) NIS (usft) EMI Northing (usft) (asft) Basil" (usft) DLeg ('1100asfq V. Seo (uslq 12,550.61 -3,472.11 58.02 339.59 8,885.57 8,815.57 4,621.75 -2,938.92 5,934,047.118 716,209.078 21.89 2,533.09 12,575.89 Interpolated Azimuth 52.74 340.68 8,899.93 8,829.93 4,641.30 -2,945.99 5,934,066.460 716,201.441 21.18 2,546.49 12,600.50 10,932.01 47.50 340.68 8,915.70 8,845.70 4,659.12 -2,952,24 5,934,084.086 716,194.680 21.29 2,558.79 12,630.56 41.31 335.88 8,937.17 8,867.17 4,678.66 -2,959.97 5,934,103.390 716,186.386 23.42 2,571.85 12,660.53 35.72 329.18 8,960.62 8,890.62 4,695.22 -2,968.51 5,934,119.696 716,177.374 23.25 2,581.92 12,710.00 35.72 329.18 9,000.79 8,930.79 4,720.02 -2,983.30 5,934,144.058 716,161.863 0.00 2,596.01 Pmjsctlon to TD Cuing Points Measured vertical Casing Nab Depth Depth Diameter Diameter (usft) (asfq Name (in) PN 10,789.00 8,776.40 9 5/8" 9.625 12.250 2,505.00 2,504.94 13 3/8" 13.375 17.500 Design Annotations Measured vertical Local Coordinates Depth Depth •WS +EAW (usft) (usft) ("it) (usft) Comment 10,800.00 8,784.82 3,609.40 -3,472.11 TIP 10,820.00 8,800.19 3,619.78 -3,479.58 KOP 10,840.01 8,815.48 3,630.37 -3,486.96 Interpolated Azimuth 10,870.11 8,837.71 3,648.28 -3,496.41 Interpolated Azimuth 10,900.70 8,858.18 3,670.06 -3,502.72 Interpolated Azimuth 10,932.01 8,876.58 3,695.25 -3,504.58 Interpolated Azimuth 12,710.00 9,000.79 4,720.02 -2,983.30 Projection to TD Approved By Yosha Ragbirsingh Survey Manager Baker Hughes I 3/2/2016 3.44:37PM Paye 18 COMPASS 5000.1 Build 61 WEl3BOREDETAIL8: 1FiS4 fQifAFNCEInCPM1,M! ��.. Prgect: P.u81pe9ay 6b.Ewu.0 We;:100816 ene.kEW 1615. CoaaMel 6ennrce: VMisiS. ixeuun WeY: ,4,3 9�yxsIS�M Venw(rv018ewerce'. W-R.K. ObpWanon: 14154 dz�im P61M1YanMD: 1164.501 »�� _ m®mraµmo�AOEBAMR Oui9n:1F15A11F1910.t6A1 rea4¢mwn Tb an MD: 11810.51 HUGHES Post Drilling /,,OGCC OFFSET REPORT Eu ting(350ustriin) > N 06-13 N N 0 MISS 16-1 SB35850 s93s ° pp O 5935700 59;148 s&we5o 16 1411 14 16 14/i 44 6 5934800 D 1 593425m 5933900 16- 515 15A e 5873900 59375 5 933550 5&i72 16 1 per. 5933200 C B 5Rn850 p N 5832500 C E�i159321 00 00 5932150 4 c_ 5931 Ai 1 90 600 p 5831800 5931 03-13/03-13 C t 5531450 C 0 59311 0 5.48 16-2 00 5931100 59307 0 6151-511 TA x'05° 5930100 60 s93 ro 0 ts- io °o, sB30050 5929]00 0 592935D 6+1 16-1 o 0 6 -it 16-1 5929m00 p d 5929350 5929000 0 O 59158 59283 o. 1 -12/ 6-12 5929850 5928.100 ork5®TO.00uB o 0 0 o e o 0 0 0 o e o 0 0 0 0 0 o e o 0 0 0 0 0 0 0 0 0 0 0 o e Easting (350 tilt in) /,,OGCC OFFSET REPORT by Post Drilling North America - ALASKA - BP Prudhoe Bay PB DS 16 16-15 16-15A 16-15A Anticollision Summary Report 17 March, 2016 rik-2 BAKER HUGHES /�OGCC OFFSET REPORT BP FORE by Anticollision Report BRIM NVMHFS Company: North America -ALASKA - BP Project: Prudhoe Bay Reference Site: PB DS 16 Site Error: 0.00usft Reference Well: 16-15 Well Error: 0.00usft Reference Wellbore 16-15A Reference Design: 16-15A Local Co-ordinate Reference: TVD Reference: MD Reference: Norm Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 16-15 orkb @ 70.00usft orkb @ 70.00usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Reference 16-15A Filter type: NO GLOBAL FILTER: Using user defined selection & filtering critena To Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: Unlimited Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,211.02usft Error Surface: Elliptical Conic Survey Program Date 3/17/2016 From To (raft) (usft) Survey (Wellbore) Tool Name Description 100.00 10,800.00 GyroDate Gyro (16-15) GYD-CT-CMS Gymdata cont.casing m/s 10,820.00 11,640.51 CTK MWD 4-114"(16-15APB1) MWID MWD -Standard 11,650.00 12,550.22 CTK MWD 4-1/6'(16-15A) MWD MWD -Standard Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) PB DS 03 03-13-03-13-03-13 9,543.91 9,875.00 599.91 873.76 -27001 FAIL - Major Risk PB DS 16 16-11 - 16-11 - 16-11 2,767.72 2,775.00 475.34 52.91 422.43 Pass - Major Risk 16-12 - 16-12 - 16-12 2,700.00 2,700.00 348.26 39.80 308.48 Pass- Major Risk 16-12 .16-12A- 16-12A 2,725.00 2,725.00 348.21 39.72 308.52 Pass- Major Risk 16-13-16-13-16-13 3,569.19 3,650.00 223.06 55.88 168.05 Pass - Major Risk 16-14-16-14-16-14 1,799.73 1,800.00 119.90 26.25 93.65 Pass - Major Risk 16 -14 -16 -14A -16-14A 1,803.58 1,800.00 119.95 26.30 93.65 Pass - Major Risk 16 -14 -16 -14B -16-14B 1,802.73 1,800.00 119.94 26.29 93.65 Pass - Major Risk 16-15-16-15-16-15 10,849.94 10,850.00 0.99 4.73 -3.30 FAIL - Major Risk 16-15 - 16-15APS1 - 16-15APB1 11,650.00 11,650.00 0.00 1.26 -1.06 FAIL - Major Risk 16-16-16-16-16-16 3,357.62 3,350.00 68.88 47.14 22.60 Pass - Major Risk 16-28 - 16-28 - 16-28 2,767.36 2,775.00 158.99 39.70 119.29 Pass - Major Risk 16-29 - 16-29 - 16-29 2,100.36 2,100.00 300.55 30.55 270.00 Pass - Major Risk 16 -29 -16 -29A -16-29A 2,100.36 2,100.00 300.55 30.55 270.00 Pass - Major Risk 3/172016 5:33:26PM Page 2 of 3 COMPASS 5000.1 Build 61 BP -"J a by Anticollision Report n Company: North America -ALASKA - BP Local Coordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft Reference Site: PB DS 16 MD Reference: orkb @ 70.00usft Site Error: 0,00usft North Reference: True Reference Well: 16-15 Survey Calculation Method: Minimum Curvature Well Error: 0.0ousft Output errors are at 1.00 sigma Reference Wellbore 16-15A Database: EDM R5K-Alaska PROD -ANCP1 Reference Design: 16-15A Offset TVD Reference: Offset Datum I/.rS BAKER HUGHES Reference Depths are relative to orkb @ 70.00usft Coordinates are relative to: 16-15 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04 Central Meridian is 150° 0'0.000 W - Grid Convergence at Surface is: 1.66" 1200- !u 300- 52 Ladder Plot 0 2500 5000 7500 10000 Measured Depth (2500 usWin) -9- 03.13,03-13,03-13V1 -Ar 16-11,16-11,16-11 V1 $ 16-12,16-12,16-12V1 $ 16-12,16-12A,16-12AV3 $ 16-13,16-13,16-13V1 LEGEND 12500 15000 $ 16-14,16-14,16-14V10 16-16,16-16,16-16V1 �f 16-14,16-14A,16-14AV11 $ 16-28,16-28,16-28V1 --�- 16 -14,16 -14B,16 -14B VS $ 16-29,16-29,16-29V1 �- 16-15,16-15,16-15V1 -)K- 16.29,16-29A,16-29AVO $ 16-15,16-15APB1,16-1SAPB1 VO $ 16-15A 3/172016 5:33.'26PM Page 3 of 3 COMPASS 5000.1 Build 61 1I =- =G VT UU44 WELLHEAD MLEVOY --- ACTUATOR= BAK6RC OKB. a24 = --- — - - 70' BE ELEV = 10878 - 10891 KO_P= 3262' Max Angle = - 50' 67 _00' Datum hD= 10937" Datum TVD= 8804 SS OPS SHUTDOWN 20" COND, D= 7 80' 13-3/8" CSG, 72#, L -80/K-55, D =12.347' 9-518" X 7" ZXP LTP w /FMC HGR D = 6.25" 6006' 1.CK, 26#, L-80, .0383 bpi, D = 6176" Minimum ID = 3.725" @ 11039' 41/2" HES XN NIPPLE 12.6#, 13CR .0152 bpf, D = 3.958" I—F 106 9-5/8" CSG, 47#, L-80 BTRS, D = 8.681' 7" BKR DELTA WS (01/23/16) DUMP BAILED CMT (0122/16) 7' P06tSEr PLUG (01/21/16; RT14LLY SET POSISET PLUG (0121/161 PERFORATION SULIMRY W LOG: BFCS ON 12/1485 ANGLE AT TOP PERF: 38'Q 10870' Note: Refer to Production DB for historical perf data SIZE SPF I INTERVAL Opn/Sgz SHOT SOZ 3-38" 4 10878 - 10891 S 07/09186 0 3-38' 4 10679 - 10892 C 06/1288 DMt' M 3-38' 4 10897 - 10915 C 06/12/88 FINALODEAPPROVAL 3-38' 4 10918- 10933 C 06/12/88 44 3-38" 4 10918 - 10933 S 07/09/86 9733 7984 3-38" 4 10936 - 10949 C 06/12/88 6 3-38' 4 10936- 10949 S 07MBB 03/05M 3-38' 4 10959 - 11006 C 06/12/88 3-38' 4 10959 - 11006 S 07/09/86 3-38" 6 11045 - 11065 C 08/13/09 3-38' 2 11060-11066 C 10/19/92 3-38" 12 11080- 11080 S 06/23/86 3-31W 1 6 111075 - 110951 C 08/13/09 ITOPOF4-12" .0152 bot. D=3.9: "0 BTRS, .0371 bpf, D = 16 15A SA / NOTES: '"'CHROME TBG" D = 3.812" 19TiRIN 22T'_7":.'::10 ST MD TVD DEVI TYPE VLV LATCH I PORT DATE 1 3309 3306 10 K:2 -LS DMY NT 0 0820!06 2 3701 3686 17 KBG-2-LS DMt' M 0 05/29/14 3 6872 5987 50,- FINALODEAPPROVAL OW OW M 0 0529/14 4 9026 7503 44 KBG2-LS DMY M 0 03105/98 5 9733 7984 48 KBG-2-LS DMY M 0 08/13106 6 10363 8430 41 KBG-2-LS DMY M 0 03/05M I 10590' I 10645' J-14-12- TU6NG TAL YYLEG. D = 4.000" 10666' ELMO TT NOT LOGGED MLLO(fTVMDOW (16-T5A) 10825'-10&34- 16-ISA 0825'-10834' 16-15A PB1 HOLE 11039' -14-1/2" FES XN NP, D= 3.72 11042' 4-12"TIBNG TA L, D=3.8 11042' ELM TT LOGGED 02/2582 DATE REV BY COWASNTS DATE REV BY 0OMY84TS 1211485 ORIGINALCOMPLETION 1211881 RWO 0385198 N2EB LAST WORKOVBR 02MVIS NOMC2 OPS S141lTDOWN(16-15A) 03/07116 JhD DFLG HO ACTIONS 03107/16 TB/JM7 FINALODEAPPROVAL PR(/a-DE BAY (l!T WELL 16-15A PEFWr No: 2151870 AP No: 50-028-21474-01 Sec. 24, T10N RISE 1417' FN -8505' BP Exploration (Alaska) //ais BAKER HUGHES RECEIVF� MAR0 9 201u ya ipGCC PRINT DISTRIBUTION LIST COMPANY BP Exploration Alaska Inc WELL NAME 16-15A FIELD Prudhoe Bay Unit COUNTY North Slope Borough BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patric�bakerhuohes.com STATUS Final Replacement: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION Of 21 5187 26904 ase sign and return one copy of this transmittal form to: Exploration (Alaska) Inc. rotechnical Data Center, LR2-1 DATA LOGGED E. Benson Blvd. 3/14/2016 M.K.BENDER ;horage, Alaska 99508 LOG TYPE GR -RES LOG DATE February 27, 2016 TODAYS DATE March 8, 2016 Revision No Details: Requested by: FIELD FINAL CD CD LOGS LOGS I (digital/image) Surveys (Final Surveys) # OF PRINTS # OF PILIN I S # OF COPIES # OF COPIES # OF COPIES BP North Slope L EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker 900 E. Benson Blvd. Anchorage, Alaska 99508 is 2 ConocoPhillips Alaska Inc. 0 Attn: Ricky Elgaricio ATO 3-344 700 G Street Anchorage, AK 99510 3 ExxonMobil, Alaska 1 Attn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 ,Anchorage, AK 99503 4 State of Alaska -AOGCC 'Attn: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division of Oil & Gas *** D Attn: Sean Clifton 550 West 7th Avenue, Suite 802 Anchorage, Alaska 99501 ** Stamp "confidential' on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, L112-1 900 E. Benson Blvd. ,Anchorage, Alaska 99508 Attn: Donald Surles lu TOTALS FOR THIS PAGE: 0 3 4 5 0 0 TOTALS FOR ALL PAGES: 0 3 4 5 0 0 *^-W by 004k RECEIVED MAR 0 9 2010 AOGCC North America - ALASKA - BP Prudhoe Bay PB DS 16 16-15 16-15A 500292147401 Design: 16-15A Final Survey Report 02 March, 2016 21 51 87 26 90 4 FS 0i BAKER HUGHES .00. BID I/.as by Final Survey Report BAKER HUGHES V Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 16 Well: 16-15 Wellbore: 16-15A Design: 16.15A Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 16-15 orkb @ 70.00usft orkb @ 70.00usft True Minimum Curvature EDM R5K - Alaska PROD - ANCPt Project Prudhoe Bay. GPB, PRUDHOE BAY Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 16. TR -1045 +N/ -S 0.00 usft Northing: 5,929,512.870 usft Latitude: Site Position: Northing: 5.927.441.990 usft Latitude: 70' 12' 15.545 N From: Map Easting: 718.969.880 usft Longitude: 148' 14'4.567 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.66 ' Well 16-15, 16-15 Magnetics Well Position +N/ -S 0.00 usft Northing: 5,929,512.870 usft Latitude: 70' 12'35.816 N +E/ -W +E/ -W 0.00 Usti Easting: 719,280.830 usft Longitude: 148' 13' 53.802 W Position Uncertainty 0.00 usft Wellhead Elevation: 39.96 usft Ground Level: 36.69 usft Wellbore 16-15A Magnetics Model Name Sample Date Declination Dip Angle Field Strength 11 (1 (nn BGGM2015 2/1/2016 19.38 81.03 57.552 Design 16 -ISA Audit Notes Version: 1.0 Phase: ACTUAL Tie On Depth: 11.640.51 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction Will (usft) (usft) (°) 30.04 0.00 0.00 327.98 3/2/2016 3:37:59PM Page 2 COMPASS 5000.1 BWId 61 b BP WERE P Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Description - -- GYD-CT-CMS Project: Prudhoe Bay MWD MWD -Standard Site: PB DS 16 (usft) (usft) Well: 16-15 (usft) (`1100usft) (usft) Wellbore: 16-15A 0.00 0.00 5.929512.870 Design: 16-15A 0.00 0.00 30.00 Survey Program Date 3/2/2016 5,929,512.894 719.280.704 From To 130.00 0.00 (usft) (usft) Survey (Wellbore) 719,280.201 100.00 10,800.00 GymData Gyro (16-15) -0.17 10,820.00 11,640.51 CTK MWD 4-114"(16-15APB1) 719,279,623 0.09 11,650.00 12,550.22 CTK MWD 4-114"(16-15A) -0.60 -1.82 I Survey- 719,279,026 0.27 0.45 MD Inc Azi (azimuth) TVD (usft) (") C) 0.13 (usft) 30.04 0.00 0.00 30.04 100.00 0.21 282.32 100.00 200.00 0.38 258.69 200.00 300.00 0.32 247.60 300.00 400.00 0.55 227.06 399.99 '.. 500.00 0.47 216.10 499.99 600.00 0.49 165.33 599.99 700.00 0.52 148.46 699.98 800.00 0.37 155.20 799.98 900.00 0.53 144.01 899.98 1,000.00 0.52 137.07 999.97 1,100.00 0.38 145.44 1,099.97 1,200.00 0.43 102.25 1,199.97 1,300.00 0.48 85.93 1,299.96 1,400.00 0.43 79.70 1.399.96 1,500.00 0.28 95.19 1,499.96 1,600.00 0.41 81.98 1.599.96 1,700.00 0.34 111.60 1,699.96 1,800.00 0.19 41.87 1,799.95 1,900.00 0.34 70.74 1,899.95 5,929,507.219 719,284.617 0.20 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 16-15 orkb @ 70.00usft orkb @ 70.00usft True Minimum Curvature EDM R5K - Alaska PROD - ANCP 1 Tool Name Description - -- GYD-CT-CMS Gyrodata contcasing m/s - MWD MWD -Standard MWD MWD -Standard TVDSS WS EMI Northing Easting DI -99 V, Sec (usft) (usft) (usft) (usft) (usft) (`1100usft) (usft) -39.96 0.00 0.00 5.929512.870 719,280.830 0.00 0.00 30.00 0.03 -0.13 5,929,512.894 719.280.704 0.30 0.09 130.00 0.00 -0.63 5,929,512.853 719,280.201 0.21 0.33 230.00 -0.17 -1.21 5,929,512.665 719,279,623 0.09 0.50 329.99 -0.60 -1.82 5,929,512.214 719,279,026 0.27 0.45 429.99 -1.26 -2.42 5,929,511.539 719,278.452 0.13 0.21 529.99 -2.01 -2.55 5,929,510.790 719.278.341 0.41 -0.35 629.98 -2.81 -2.20 5,929,510.000 719,278.709 0.15 -1.21 729.98 -3.49 -1.83 5,929,509.331 719,279.102 0.16 -1.99 - 829.98 4.15 -1.42 5.929,508.676 719,279.528 0.18 -2.7'. 929.97 4.86 -0.84 5,929,507.987 719,280.129 0.06 -3,67 1,029.97 -5.47 -0.35 5,929,507.396 719,280.644 0.15 -4.45 1,129.97 -5.82 0.21 5.929,507.060 719.281.209 0.30 -5.04 1,229.96 -5.87 0.99 5,929.507.033 719,281.994 0.14 -5.50 1,329.96 -5.77 1.78 5,929,507.152 719,282.778 0.07 -5.84 1,429.96 -5.73 2.39 5.929.507.215 719,283.389 0.18 -6.12 1.529.96 -5.70 2.99 5,929,507.260 719.283,986 0.15 -6.42 1.629.96 -5.76 3.62 5,929,507.219 719,284.617 0.20 -6.80 1.729.95 -5.74 4.01 5.929,507.245 719,285.003 0.33 -7.00 1.829.95 -5.52 4.40 5,929.507.477 719,285.387 0.20 -7.02 3/2/2016 3:37:59PM Page 3 COMPASS 5000. 1 Budd 61 BP RUN 'ate by Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Local Coordinate Reference: Well 16-15 Project: Prudhoe Bay ND Reference: oft @ 70.00usft She: PS DS 16 MD Reference: orkb @ 70.00ush Well: 16-15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM R5K-Alaska PROD- ANCP1 Survey MD Inc Aid (azimuth) TVD TVDSS NIS ENV Northing EasOng DLeg V. Sec (usft) (•) (°) (usft) (usft) (usft) (usft) (usft) (usft) (•HOOusft) (usft) 2,000.00 0.48 44.16 1,999.95 1,929.95 -5.12 4.97 5,929,507.892 719,285.947 0.23 -6.98 2.100.00 0.65 55.61 2,099.95 2.029.95 -4.50 5.73 5,929,508,535 719.286.689 0.20 -6.8' 2,200.00 0.40 35.31 2,199.94 2,129.94 -3.90 6.40 5,929.509.159 719.287.341 0.31 -6.70 2,300.00 0.29 40.88 2.299.94 2,229.94 -3.42 677 5,929,509.646 719,287.694 0,11 -6.49 2.400.00 0.15 74.70 2,399.94 2,329.94 -3.20 7.06 5.929,509.880 719,287.979 0.19 -6.45 2,500.00 0.22 127.96 2.499.94 2.429.94 -3.28 7.34 5.929,509.805 719.288.259 0.18 -6.67 2.600.00 0.07 231.14 2.599.94 2,529.94 -3,44 7.44 5,929,509,651 719,288.368 0.25 -6.86 2,700.00 0.19 104.55 2.699.94 2,629.94 -3.52 7.55 5.929,509.575 719,288.483 0.24 -6.99 2,800.00 141 327.64 2.799.93 2,729.93 -2.52 7.06 5,929,510.557 719.287.956 1.55 -5.88 2,900.00 4.02 310.17 2.899.81 2,829.81 0.78 3.72 5,929,513.760 719,284.524 2.71 -1.31 3000.00 5.00 315.88 2,999.50 2,929.50 6.17 -1.99 5,929,518.981 719.278.658 1.08 6.29 3,100.00 5.48 314.41 3.099.08 3.029.08 12.64 -8.44 5,929,525.261 719.272.028 0.50 15.19 3.200.00 7.30 328.59 3,198.46 3.128.46 21.41 -15.16 5,929,533.826 719,265.054 2.40 26.19 3.300.00 9.88 316.02 3,297.34 3,227.34 33.01 -24,43 5.929,545,151 719,255.451 3.18 40.94 3,325.00 10.78 312.78 3,321.93 3.251.93 36.14 -27.64 5.929,548.187 719,252.156 4.28 45.29 3,350.00 11.32 309.68 3,346.47 3,276.47 39.29 -31.24 5.929,551.236 719,248.461 3.21 49.88 3,375.00 11.95 308.44 3,370.96 3,300.96 42.47 -35.16 5.929,554.296 719,244.455 2.71 54.6' 3,400,00 12.62 307.67 3,395.39 3,325.39 45.75 -39.35 5.929 557 719,240.173 2.76 59.65 3,425.00 13.13 307.86 3419.76 3.349.76 49.16 -43.75 5,929,560.734 719,235.672 2.05 64.88 3.450.00 13.50 307.84 3444.08 3.374.08 52.69 -48.30 5,929,564.133 719.231.026 1.48 70.28 3,475.00 13.77 307.93 3,468.38 3,398.38 56.31 -52.95 5.929.567.615 719.226.271 1.08 75.82 3,500.00 14.11 308.18 3,492.64 3,422.60 60.02 -57.69 5,929,571.188 719,221.424 1.38 81.48 3,525.00 14.43 308.46 3,516.87 3,446.87 63.84 -62.53 5.929,574.867 719,216.480 1.31 87.28 3,550.00 14.71 308.80 3,541.07 3,471.07 67.77 -67:44 5.929.578.649 719.211.456 1.17 93.22 3.575.00 14.97 309.16 3.565.23 3.495.23 71.80 -72.42 5.929,582.530 719.206,364 1.10 99.27 3,600.00 15.31 309.30 3,589.37 3,519.37 75.93 -77.47 5,929.58&511 719,201.188 1.37 105.45 3,625.00 15.56 309.64 3,613.46 3,543.46 80.16 -82.61 5,929,590.590 719,195.932 1.06 111.76 3/22016 3:37'59PM Page 4 COMPASS 50001 Build 61 1...� by Inc BP TVD riFla X0+14 Final Survey Report Northing BAKER DLag V. Sec (usft) HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft (usft) Site: PB DS 16 MD Reference: orkb @ 70.00usft 3,637.53 Well: 16-15 North Reference: True 5,929,594.778 Wellbore: 16-15A Survey Calculation Method: Minimum Curvature 3,675.00 Design: 16-15A Database: EDM R5K - Alaska PROD - ANCP1 88.98 Survey MD Inc Azi (azimuth) TVD TVDSS WS E/W Northing Basting DLag V. Sec (usft) (') (°) (uaft) (usft) (usft) (usft) (usft) (usft) ('1100usft) (usft) - 3,650.00 15.89 310.06 3,637.53 3,567.53 84.50 -87.81 5,929,594.778 719,190.607 1.40 118.21 3,675.00 16.28 310.59 3.661.55 3,591.55 88.98 -93.09 5,929,599.105 719,185.199 1.67 124.80 3,700.00 16.79 310.94 3.685.52 3,615.52 93.63 -98.48 5,929503.593 719,179.678 2.08 13160 3,725.00 17.41 311.02 3,709.41 3,639.41 98.45 -104.03 5,929,608.250 719,173.991 2.48 136.63 3,750.00 17.86 311.32 3,733.24 3.663.24 103.43 -109.73 5,929,613.068 719,168.148 1.64 145.88 3,775.00 18.67 311.59 3,756.98 3,686.98 108.62 -115.60 5,929,618,083 719,162.128 3.26 153.39 3,800.00 19.44 311.71 3,780.61 3,710.61 114.04 -121.70 5,929,623.328 719.155.874 3.08 161.22 3,825.00 20.13 311.83 3.804.13 3,734.13 119.68 -128.01 5,929,628.779 719,149.402 2.76 169.35 3,850.00 20.76 311.98 3.827.56 3,757,56 125.51 -134.51 5,929,634.420 719,142.737 2.53 177.74 3,875.00 21.42 312.21 3,850.88 3,780.88 131,55 -141.19 5,929.640.254 719.135.890 2.66 186.39 ' 3.900.00 22.24 312.59 3,874.09 3,804.09 137.81 -148.05 5,929,646.321 719,128.847 3.33 195.35 3,925.00 23.11 312.88 3,897.16 3,827.16 144.35 -155.13 5,929.652.652 719.121.582 3.51 204.65 3,950.00 23.74 313.11 3,920.09 3,850.09 151.13 -162.40 5,929,659.216 719,114.119 2.55 214.25 3,975.00 24.43 313.32 3,942.92 3,872.92 158.12 -169.83 5,929,665.983 719106.485 2.78 224.11 4,000.00 25.22 313.47 3.965.61 3,895.61 165.33 -177.46 5,929,672,969 719,098.652 3.17 234.27 ., 4,025.00 26.03 313.58 3,988.15 3.918.15 172.78 -185,30 5,929.680.184 719,090.600 3.25 244.7, _ 4,050.00 26.74 313.73 4,010.54 3.940.54 180.44 -193.34 5,929,687.616 719,082.343 2.85 255.50 4,075.00 27.46 313.87 4,032.80 3,962.80 188.33 -201.56 5,929,695.257 719,073.898 2.89 266.55 '., 4.100.00 28.23 313.99 4.054.90 3,984.90 196.43 -209.97 5,929,703.110 719,065.258 3.09 277.87 4,125.00 29.11 314.05 4.076.84 4,006.84 204.76 -218.59 5,929,711.191 719,056.395 3.52 289.51 4,150.00 30.00 314.07 4.098.59 4,028.59 213.34 -227.45 5,929,719.505 719,047.289 3.56 301.48 4,175.00 30.84 314.08 4,120.14 4,050.14 222.14 -236.55 5,929,728,042 719.037.943 3.36 313.77' 4,200.00 31.75 314.16 4,141.51 4.071.51 231.18 -245.87 5,929,736.807 719,028.363 3.64 326.38 4,225.00 32.66 314.22 4,162.66 4.092.66 240.47 -255.42 5,929,745.812 719.018,544 3.64 339.32 4.250.00 33.56 314.40 4,183.60 4,113.60 250.01 -265.19 5,929,755.064 719,008,500 3.62 352.59 4,275.00 34.35 314.60 4.204.34 4,134.34 259.80 -275.15 5,929,764.557 718.998.261 3,19 366.17 4,300.00 34.97 314.76 4,224.90 4,154.90 269.80 -285.26 5,929,774.256 718,987.866 2.51 380,00 3/2/2016 3:37:59PM Page 5 COMPASS 5000.1 Build 61 BP //RE by Final Survey Report NVGN ES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bey ND Reference: orkb @ 70.00usft Site: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature (uaft) (uaft) Database: EDM R5K - Alaska PROD - ANCP1 Design: 16-15A 314.88 4,245.33 Survey MD Inc Ari (azimuth) TVD TVDSS NIS EIW Northing Basting DLeg V. Sec (waft) (°) (°) (watt) (usft) (uaft) (usft) (uaft) (uaft) (°1100usft) (waft) 4,325.00 35.46 314.88 4,245.33 4.175.33 279.96 -295.49 5,929,784.116 718.977.350 1.98 394.04 4,350.00 35.94 315.04 4.265.63 4,195.63 290.27 -305.81 5.929.794.120 718.966.733 1.96 408.2. 4.375.00 36.56 315.18 4.285.79 4.215.79 300.74 -316.24 5.929,804.285 718,956.001 2.50 422.66 4,400.00 37.36 315.30 4,305.76 4.235.76 311.41 -326.83 5,929,814.646 718,945.112 3.21 437.33 4,425.00 38.15 315.28 4,325.53 4.255.53 322.29 -337.60 5,929.825.207 718.934.033 3.16 452.26. 4,450.00 39.16 315.25 4,345.05 4,275.05 333.38 -348.59 5,929,835.975 718.922.725 4.04 467.49 4,475.00 40.55 315.43 4,364.24 4,294.24 344.78 -359.85 5.929,847.039 718.911.139 5.58 483.12 4,500.00 42.00 315.92 4.383.03 4,313.03 356.58 -371.37 5929,858.497 718,899.279 5.94 499.24 4,525.00 43.24 316.08 4,401.43 4.331.43 368.75 -383.13 5.929.670.327 718,887.172 4.98 515.80 4,550.00 44.32 316.18 4,419.48 4,349.48 381.22 -395.12 5.929,882.443 718.874.828 4.33 532.73 4,575.00 44.94 316.25 4,437.27 4.367.27 393.90 -407.27 5.929,894.764 718,862.313 2.49 549.92 4,600.00 45.24 316.28 4454.92 4.384.92 406.70 -419.51 5,929,907.195 718,849,707 1.20 567.26 4.625.00 45.49 316.27 4,472.48 4,402.48 419.55 431.81 5,929,919.688 718,837.043 1.00 584.68 4,650.00 45.73 316.28 4,489.97 4.419.97 432.46 -444.15 5,929.932.234 718.824.326 0.96 602.17 4,675.00 45.98 316.30 4,507.39 4,437.39 445.43 -456.55 5,929.944.835 718,811.559 1.00 619.74 4,700.00 46.02 31646 4,524.75 4,454.75 458.45 -468.96 5,929,957,488 718.798,780 0.49 637.35 4,725.00 46.08 $16.57 4,542.10 4,472.10 471.51 -481.34 5,929,970.151 718,786.021 0.40 654.9 4.750.00 46.19 316.63 4.559.43 4,489.43 484.60 -493.73 5.929.982.911 718.773.262 0.47 672.66 4.775.00 46.28 316.70 4,576.72 4.506.72 497.74 -506.12 5.929.995.678 718.760.496 0.41 690.37 4,800.00 46.31 316.73 4,593.99 4.523.99 510.89 -518.51 5.930.008 468 718.747 729 0.15 708.09 4,825.00 46.46 316.71 4.611.24 4,541.24 524.07 -530.92 5,930,021.278 718,734.944 0.60 725.84 4,850.00 46.69 316.76 4,628.42 4.558.42 537.29 -543.36 5.930,034,132 718.722,121 0.93 743.65 4,875.00 46.78 316.83 4,645.56 4,575.56 550.56 -555.82 5,930,047.034 718,709,279 0,41 761.51 4,592.67 563.86 -568.29 5.930,059.962 718,696.434 0.23 779.39 4,900.00 46.83 316.87 4,662.67 - 4.925.00 46.98 316.91 4,679.75 4.609.75 577.18 -580.76 5,930,072.921 718,683.577 0.61 797.31 4.950.00 47.02 317.02 4.696.80 4,626.80 590.55 -593.24 5,930,085.917 718,670.717 0.36 815.25 4.975.00 47.16 317.04 4,713.82 4.643.82 603.95 -605.72 5,930,098.946 718.657.853 0.56 833.23 31212016 3.37:59PM Page 6 COMPASS 5000.1 Build 61 .,tr..i by BP .eAita zhMa Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 16 Well: 16-15 Wellbore: 16-15A Design: 16-15A Survey Local Coordlnate Reference: Well 16-15 TVD Reference: orkb @ 70.00usft MD Reference: orkb @ 70.00ustt North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCP1 MD Inc Aid (azimuth) ND TVDSS Ws EIW Northing Easting DLeg V. Sec (usft) (') r) (usft) (usft) (usft) (usft) (usft) (usft) r/100usft) (usft) - 5,000.00 47.34 317.06 4730.79 4,66D.79 617.38 -618.23 5,930.112.014 718,644.960 0.72 851.2E 5,025.00 47.18 317.18 4,747.78 4,677.76 630.84 -630.73 5,930,125.100 718,632.081 0.73 869.29 5,050.00 46.87 317.40 4.764.80 4.694.80 644.28 -643.13 5,930.138.173 718,619.290 1.40 887.26 5,075.00 46.75 317.66 4.781.91 4,711.91 657.72 -655.44 5,930,151.255 718,606.598 0.90 905.19 5,100.00 46.88 317.89 4,799.02 4,729.02 671.22 -667.69 5,930,164.391 718,593.961 0.85 923.13 5,125.00 47.10 317.97 4.816.07 4,746-07 684.79 -679.94 5,930,177,600 718,581.324 0.91 941.13 5,150.00 47.36 317.99 4,833.05 4,763.05 698.43 -692.22 5,930,190.870 718,568.649 1.04 959.20 5,175.00 47.43 318.07 4,849.97 4,779.97 712.11 -704.53 5,930,204.188 718.555.952 0.37 977.33 5,200.00 47.46 318.14 4,866.88 4.796.88 725.82 -716.83 5,930,217.532 718,543.263 0.24 99547 5,225.00 47.63 318.14 4,883.75 4,813.75 739.55 -729.14 5,930,230.906 718,530.561 0.68 1,013.64 5,250.00 47.79 318.05 4,900.58 4,830.58 753.32 -741.49 5,930,244.305 718,517.815 0.69 1,031.86 j 5,275.00 47.95 317.41 4,917.35 4.847.35 767.04 -753.96 5,930,257.656 718.504.951 2.00 1,050.11 5,300.00 48.11 316.45 4.934.07 4,864.07 780.62 -766.65 5,930,270.859 718,491,870 2.93 1,068.35 ' 5,325.00 48.36 315.95 4.950.72 4,880.72 794.07 -779.56 5,930,283.937 718.478.579 1.80 1,086.60 5,350.00 48.65 315.85 4,967.28 4,897.28 807.52 -792.59 5,930,296.999 718,465.163 1.20 1,104.91 5,375.00 48.90 315.82 4,983.76 4,913.76 821.01 -805.69 5.930,310.100 718,451.677 1.00 1,123.3( 5,400.00 49.02 315.74 5,000.17 4,930.17 834.52 -818.84 5.930,323.226 718,438.140 0.54 1,141.73 5,425.00 49.33 315.76 5,016.52 4,946.52 848.07 -832.04 5,930.336.387 718,424.552 1.24 1,160.22 5,450.00 49.61 315.75 5,032.76 4,962.76 861.69 -845.30 5,930.349.608 718,410.905 1.12 1,17879 5,475.00 49.91 315.75 5,048.91 4,978.91 875.36 -858.61 5.930.362.884 718.397.198 1.20 1,197.44 5,500.00 50.18 315.71 5,064.97 4,994.97 889.08 -871.99 5,930.376.212 718,383.429 1.09 1,216.16 5.525.00 50.27 315.51 5,080.96 5,010.96 902.81 -885.43 5,930,389.545 718.369.595 0.71 1234.93 5,550.00 49.99 314.85 5,096.99 5,026.99 916.42 -898.96 5,930.402.757 718,355.682 2.32 1,253.64 5.575.00 49.60 314.19 5.113.13 5,043.13 929.81 -912.57 5,930.415743 718,341.686 2.55 1,272.21 5,600.00 48.53 313.19 5,129.51 5,059.51 942.85 -925.23 5,930,428.386 718,327.659 5.24 1,290.51 5,625.00 47.52 312.46 5.146.23 5.076.23 955.49 -939.86 5,930,440.619 718,313.668 4.59 1,308.45 5,650.00 46.81 312.14 5.163.22 5,093.22 967.82 -953.42 5,930,452.558 718,299.756 2.99 1,326.10 31212016 3:37.59PM Page 7 COMPASS 5000.1 Bu0d 61 BP //RN by Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Local Coordinate Reference: Well 16-15 Project: Prudhoe Say TVD Reference: orkb @ 70.00usft Site: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM R5K-Alaska PROD - ANC PI Survey MD Inc Azi (azimuth) TVD TVDSS NIS EAM Northing Easting DLeg V. Sec (usft) 0 0 (usft) (usft) (usft) (usft) (usft) (usft) (9100usft) (usft) 5.675.00 46.42 312.10 5.180.39 5,110.39 980.01 -966.89 5,930.464,346 718,285.932 1.56 1,343.58 1 5,700.00 46.51 312.07 5,197.61 5,127.61 992.16 -980.34 5,930,476.097 718.272.135 0.37 1,361.0' 5,725.00 46.52 312.18 5.214.82 5.144.82 1,004.32 -993.80 5,930.487.868 718,258.335 0.32 1,378.46 5,750.00 46.41 312.39 5.232.04 5.162.04 1,016.52 -1,007.20 5,930,499.667 718.244.579 0.75 1.395.91 5.775.00 46.19 312.67 5,249.31 5.179.31 1,028.74 -1,020.52 5.930,511.492 718,230.911 1.20 1413.33 5.800.00 46.06 312.90 5,256.64 5.196.64 1,040.98 -1,033.75 5.930,523.343 718.212336 0.84 1,430.72 5.825.00 46.17 312.98 5.283.97 5.213.97 1.053.25 -1,046.94 5.930.535.229 718,203.795 0.50 1.448.12 5.850.00 46.29 313.01 5.301.26 5,231.26 1,065.56 -1.060.14 5,930,547,151 718.190.239 0.49 1465.56 5.875.00 46.28 313.06 5,318.54 5.248.54 1.077.89 -1,073.35 5.930,559.093 718.176.680 0.15 1.483.02 5,900.00 46.43 313.09 5.335.79 5,265.79 1,090.25 -1.086.57 5.930,571.059 718,163.113 0.61 1,500.50 5.925.00 46.34 313.14 5,353.04 5.283.04 1.102.62 -1,099.78 5,930,583.040 718.149,547 0.39 1.518.00 5.950.00 46.15 313.21 5.370.33 5,300.33 1,114.98 -1,112.95 5,930.595.007 718.136,026 0.79 1,535.46 5.975.00 46.15 313.26 5.387.65 5,317.65 1.127.32 -1.126.08 5.930,606.970 718.122.538 0.14 1,552.89 6,000.00 46.45 313.28 5,404.92 5,334.92 1.139.71 -1,139.24 5.930,618,970 71.8.109.024 1.20 1,570.37 6.025.00 46.21 313.42 5,422.18 5,352.18 1.152.13 -1,152.39 5,930.630.996 716.095.520 1.04 1,587.87 6,050.00 46.29 313.53 5,439.47 5.369.47 1,164.55 -1,165.50 5.930,643.035 718,082.060 0.45 1,605.35 ^ 6.075.00 46.36 313.76 5,455.73 5.386.73 1.177.03 -1,178.58 5.930,655.129 718.068.620 0.72 1.622.8- ` 6,100.00 46.33 314.09 5,473.99 5.403.99 1,189.58 -1.191.61 5,930,667.293 718,055.234 0.96 1,640.42 6,125.00 46.22 314.44 5,491.27 5,421.27 1.202.19 -1.204.55 5,930,679.521 718.041.936 1.10 1,657.97 6.150.00 46.05 314.78 5,508.60 5,438.60 1,214.85 -1,217.38 5.930.691.801 718.028.743 1.19 1,675.51 6.175.00 45.97 315.04 5,525.96 5,455.96 1,227.55 -1.230.12 5930.704.123 718,015.642 0.81 1693.03 6,200.00 46.01 315.25 5.543.33 5.473.33 1,240.29 -1,242.80 5.930,716.495 718.002.596 0.62 1,710.56 6,225.00 46.01 315.46 5.560.69 5490.69 1,253.09 -1,255.44 5.930.728.919 717,989.590 0.60 1728.11 - 6,250.00 45.96 315.65 5,578.06 5.508.06 1,265.92 -1.268.03 5.930,741.383 717.976.634 0.58 1745.67 6,275.00 45,87 315.83 5,595.46 5,525.46 1,278.79 -1,280.56 5.930.753.874 717,963.734 0.63 1,763.22 6,300.00 45.66 315.98 5,612.90 5,542.90 1,291.65 -1,293.03 5.930.766.370 717.950.902 0.94 1,780.73 6,325.00 45.73 316.05 5.630.36 5,560.36 1,304.52 -1,30545 5.930,778.876 717,938.109 0.34 1798.23 3/212016 3:37-59PM Page 8 COMPASS 5000.1 Build 61 BP FUN V by Final Survey Report BAKER MUGMES Company: North America - ALASKA -BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft Site: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16.15 North Reference: True Wellbore: 16-i5A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS PJW Northing Easting DLeg V. Sec (uaft) (') (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) -- 6,350.00 45.80 316.13 5,647.80 5,577.80 1,317.43 -1,317.87 5,930,791.414 717,925.318 0.36 1,815.71 6.375.00 45.85 316.23 5,665.22 5,595.22 1,330.36 -1,330.29 5,930,803,985 717,912.533 0.35 1,833.31 6.400.00 46.00 316.33 5.682.61 5,612.61 1,343.34 -1,342.70 5,930,816.599 717,899.749 0.67 1.850.90 6.425.00 46.32 316.42 5.699.93 5,629.93 1,356.40 -1,355.14 5,930,829.284 717,886.935 1.31 1,868.57 6.450.00 46.66 316.52 5.717.14 5,647.14 1,369.54 -1,367.63 5,930,842.061 717,874.071 1.39 1,886.33 6,475.00 47.00 316.68 5,734.24 5,664.24 1,382.79 -1.380.16 5,930.854.939 717,861.165 144 1,90421 6,500.00 47.30 316.76 5751.24 5,681.24 1.396.13 -1,392.72 5,930,867.911 717,848.218 1.22 1,922.18 6,525.00 47.63 316.85 5.768.15 5,698.15 1,409.56 -1,405.33 5,930,880.968 717835.224 1.35 1,940.25 6,550.00 47.95 316.96 5,784.94 5.714.94 1,423.09 -1,417.98 5,930,894.116 717,822.187 1.32 1,958.43 6,575.00 48.23 317.12 5,801.64 5,731.64 1,436.70 -1.430.66 5,930,907.358 717,809.118 1.22 1,976.69 6,600.00 48.54 317.28 5,818.24 5,748.24 1,450.42 -1,443.36 5,930,920.696 717,796.027 1.33 1,995.05 6,625.00 48.93 317.51 5,834.73 5,764.73 1,464.25 -1,456.08 5.930,934.152 717,782.910 1.71 2,013.53 6,650.00 49.38 317.61 5,851.08 5,781.08 1,478.20 -1468.84 5,930,947732 717,769.749 1.83 2,032.13 6,675,00 49.73 317.69 5,867.30 5,797.30 1,492.26 -1.481.66 5,930,961.414 717,756.530 1.42 2,050.84 6,700.00 49.84 317.76 5,883.44 5,813.44 1,506.39 -1,494.50 5,930,975.160 717,743.284 0.49 2,069.63 6,725.00 49.76 317.82 5,899.58 5829.58 1,520.53 -1,507.33 5,930,988.924 717.730.050 0.37 2,088.4- 6,750.00 49.90 317.79 5,915.71 5,845.71 1,534.69 -1,520.16 5,931,002.698 717.716.814 0.57 2.107.23 6,775.00 49.97 317.74 5,931.80 5,861.80 1,548.85 -1,533.02 5.931,016.484 717,703.548 0.32 2,126.06 6,800.00 49.89 317.70 5,947.89 5,877.89 1,563.01 -1:545.89 5,931,030.258 717,690.273 0.34 2,144.88 6,825.00 49.66 317.66 5,964.03 5,894.03 1,577.12 -1,558.74 5,931,043.992 717.677.017 0.93 2,163.66 6,850.00 49.48 317.61 5,980.25 5,910.25 1,591.18 -1571.57 5,931,057.673 717,663.792 0.74 2.182.38 6,875.00 49.42 317.55 5.996.50 5.926.50 1,605.20 -1,584.38 5,931071.318 717.650.577 0.30 2,201.07 6,900.00 48.94 317.42 6,012.84 5,942.84 1,619.15 -1,597.17 5,931,084.886 717,637.393 1.96 2,219.67 6,925.00 48.93 317.37 6,029.27 5,959.27 1,633.02 -1.609.93 5,931.098 382 717,624.236 0.16 2,238.20 6,950.00 48.78 317.35 6.045.71 5,975.71 1,646.87 -1,622.68 5,931,111854 717.611.087 0.60 2,256.70 6,975.00 48.61 317.31 6,062.22 5,992.22 1,660.68 -1,635.41 5,931,125.287 717,597.963 0.69 2.275.16 7,000.00 48.52 317.26 6,078.76 6,008.76 1,674.45 -1,648.12 5,931,138.682 717,584.855 0.39 2,293.58 3/2/2016 3:37'59PM Page 9 COMPASS 5000.1 Build 61 BP CARS W by Final Survey Report BAKER HUGHES Company: Project: Site: North America - ALASKA- BP Prudhoe Bay PB DS 16 Local Co-ordinate ND Reference: MD Reference: Reference: Well 16-15 orkb @ 70.00usft orkb @ 70.00usft Well: Wellbore: Design: 16-15 16-15A 16-15A North Reference: Survey Calculation Method: Database: True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Survey MD Inc (usft) (•) Art (azimuth) V) TVD (usft) TVDSS (usft) NIS (usft) EIW (usft) Northing (usft) Easting (usft) DLeg (•I100usft) V. Sec (usft) 7,025.00 48.56 317.22 6.095.31 6.025.31 1,688.21 -1.660.84 5.931,152.062 717.571.742 0.20 2,311.98 7,050.00 48.62 317.23 6.111.85 6,041.85 1,701.97 -1,673.58 5,931,165.449 717,558.615 0.24 2.330.4' 7,075.00 48.59 317.22 6,128.38 6.058.38 1,715.74 -1,686.31 5.931.178.839 717,545.484 0.12 2.348.83 7,100.00 48.48 317.23 6,144.93 6,074.93 1,729.49 -1,699.04 5.931.192,214 717,532.368 0.44 2,367.23 7,125.00 48.41 317.28 6.151.52 6.091.52 1,743.23 -1,711.73 5.931,205.578 717,519.278 0.32 2,385.61 7,150.00 48.38 317.37 6.178.12 6.108.12 1,756.97 -1,724.40 5.931,218.947 717.506.213 0.29 2.403.99 7,175.00 48.35 317.45 6.194.73 6.124.73 1,770.73 -1.737.05 5,931.232.329 717493.175 0.27 2422.35 7,200.00 48.23 317.51 6,211.36 6.141.36 1,784.48 -1,749.66 5,931,245,712 717.480.168 0.51 244070 7,225.00 48.10 317.59 6,228.04 6,158.04 1,798.23 -1,762.23 5.931,259.085 717.467.203 0.57 2,459.02 7,250.00 47.95 317.64 6,244.76 6.174.76 1,811.95 -1774.76 5.931,272.443 717.454.281 0.62 2,477.31 7275.00 47.84 317.69 6,261.52 6,191.52 1,825.66 -1.787.25 5.931 285.784 717441.397 0.46 2:495.55 7,300.00 47.74 317.74 6,278.31 6,208.31 1,839.36 -1,799.71 5,931.299.115 717,428.547 0.43 2,513.78 7,325.00 47.62 317.78 6.295.15 6,225.15 1,853.05 -1,812.14 5,931.312.433 717415.729 0.49 2,531.97 - 7,350.00 4745 317.83 6312.02 6,242.02 1,866.71 -1,824.53 5,931,325.730 717,402.951 0.70 2,550.12 7.375.00 47.38 317.84 6.328.94 6.258.94 1,880.36 -1,836.88 5,931.339.009 717,390.205 0.28 2,568.24 7,400.00 47.36 317.79 6.345.87 6.275.87 1,693.98 -1.849.23 5.931,352,273 717.377.463 0.17 2.586.34 7425.00 47.32 317.79 6,362.81 6,292.81 1,907.60 -1.861.59 5,931,365.525 717.364.721 0.16 2.604.4 7.450.00 47.22 317.81 6,379.78 6,309.78 1.921.21 -1.873.92 5.931,378.765 717,351.997 0.40 2,622.51 7,475.00 47.05 317.79 6,396.78 6.326.76 1,934.76 -1,886.23 5.931,391.975 717.339.300 0.68 2,640.55 7.500.00 46.77 317.76 6,413.86 6,343.86 1.948.30 -1,898.50 5.931,405.132 717,326.643 1.12 2,658.52 7,525.00 46.76 317.78 6.430.99 6,360.99 1,961.79 -1,910.74 5,931,418.257 717,314.016 0.07 2,676.44 7,550.00 46.69 317.73 6,448.13 6,378.13 1,975.26 -1,922.98 5.931,431.370 717.301.393 0.32 2,694.35 7,575.00 46.56 317.65 6,465.29 6.395.29 1,988.70 -1.935.21 5.931,444.447 717.288.777 0.57 2712.23 7,600.00 46.43 317.58 6,482.51 6,412.51 2,002.09 -1,947.43 5,931,457.479 717.276,170 0.56 2,730.07 7,625.00 46.34 317.50 6499.75 6,429.75 2,015.45 -1,959.65 5,931,470.471 717,263.569 0.43 2,747.87 7,650.00 46.17 317.40 6.517.04 6,447.04 2,028.75 -1,971.87 5,931,483.415 717.250.975 0.74 2,765.63 7,675.00 45.99 317.29 6.534.38 6464.38 2,041.99 -1,984.07 5,931,496.298 717238.395 0.79 2,783.33 322016 3:37:59PM Page 10 COMPASS 5000.1 Build 61 BP I/.its tj by Final Survey Report BAKER `" HUGHES Company: North Amen -ALASKA -BP Local Co-orclnate Reference: Well 16-15 Project: Prudhoe Bey ND Reference: orkb @ 70.00usft Site: PB DS 16 MD Reference: orkb Q 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM RSK - Alaska PROD - ANCP1 Survey 1.02 2,906.00 717,137.557 MD (usRJ 7,700.00 7,725.00 7,750.00 7,775.00 7,800.00 7,825.00 7,850.00 7,875.00 7,900.00 7,925.00 7,950.00 7,975.00 8.000.00 8,025.00 8,050.00 8,075.00 8,100.00 8,125.00 8,150.00 8,175.00 8,200.00 8,225.00 8,250.00 8,275.00 8,300.00 8.325.00 8,350.00 3/2/2016 3:37:59PM Inc 11 45.84 45.83 45.79 45.61 45.48 45.21 44,99 45.01 45.11 45.07 44.84 44.78 44.72 44.55 44.35 44.21 44.18 44.16 44.01 43.76 43.54 43.47 43.45 43.22 42.98 42.84 42.68 Azi (azimuth) 1°1 317.1 B 317.06 316.90 316.71 316.54 316.39 316.21 316.02 315.87 315.76 315.68 315.59 315.50 315.40 315.31 315.27 315.19 315.15 315.05 315.02 315.04 315.03 314.95 314.93 314.90 314.85 314.82 TVD (usR) 6,551.77 6,569.19 6,586.62 6,604.08 6,621.58 6,639.16 6,656.80 6,674.48 6,692.14 6,709.79 6,727.48 6,745.22 6.762.97 6,780.76 6,798.61 6,816.51 6,834.43 6,852.36 6,870.32 6,888.34 6.906.43 6.924.56 6,942.71 6,960.89 6,979.14 6,997.46 7,015.81 TVDSS (usR) 6,481.77 6,499.19 6.516.62 6,534.08 6.551.58 6.569.16 6.586.80 6,604.48 6.622.14 6.639.79 6.657.48 6.675.22 6,692.97 6,710.76 6,728.61 6,746.51 6,764.43 6,782.36 6,800.32 6,818.34 6,836.43 6,854.56 6.872.71 6,890.89 6,909.14 6,927.46 6,945.81 Page 11 NIS (usR) 2,055.18 2,068.32 2,081.43 2,094.47 2,107.44 2,120.33 2,133.14 2,145.88 2,158.59 2,171.29 2.183.94 2,196.53 2,209.10 2,221.61 2234.07 2,246.47 2,258.85 2,271.20 2.283.52 2,295.78 2,307.99 2,320.17 2,332.32 2,344.44 2,356.50 2,368.51 2,380.48 ENV (usR) -1,996.26 -2,008.46 -2,020.69 -2,032.94 -2,045.20 -2.057.45 -2,069.68 -2.081.93 -2.094.24 -2,106.58 -2,118.91 -2,131.23 -2,143.56 -2,155.88 -2,168.18 -2,180.46 -2,192.74 -2,205.02 -2,217.29 -2,229.54 -2,241.74 -2,253.90 -2,266.06 -2,278.20 -2,290,30 -2,302.36 -2,314.40 Northing (usR) 5,931,509.122 5,931,521.903 5,931,534.647 5,931,547.329 5,931,559.939 5,931,572.469 5,931,584.911 5.931.597.290 5,931,609.644 5,931,621.977 5.931,634.259 5,931,646.491 5,931,658.690 5,931,670.644 5,931,682,937 5,931,694.979 5,931,706.989 5,931,718.981 5,931.730.939 5,931,742.839 5,931,754.688 5,931,766.506 5,931,778.305 5.931,790,065 5,931,801.769 5,931 813.423 5,931,825.035 Easting DLeg V. Sac (usR) (°HOOusR) (uaR) -- 717,225.824 0.68 2,800.91 --. 717,213.245 0.35 2,818.58 717,200.641 0.49 2,836.18 717,188.021 0.90 2,853.73 717,175.394 0.71 2,871.23 717,162.776 1.16 2,888.65' 717,150.176 1.02 2,906.00 717,137.557 0.54 2,923.30 717,124.889 0.58 2,940.60 717,112.186 0.35 2.957,91 717,099.492 0.95 2,975.17. 717,086.812 0.35 2,992.38 717,074,127 0.35 3009.57 717,061447 0.74 3,026.72 717,048.789 0.84 3,043.80. _. 717.036.155 0.57 3,060.6; 717,023.528 0.25 3,077.83 717,010.894 0.14 3,094.81 716,998.264 0.66 3.111.77 716.985.667 1.00 3.128.66 716,973.123 0.88 3,145.48 716.960.613 0.28 3,162.25 716.948.104 0.23 3,179.01 716.935.613 0.92 3,195.72 716,923.172 0.96 3,212.36 716,910.767 0.58 3.228.94 716,898.389 0.65 3,245.47 COMPASS 5000.1 Build 61 BP rika by Final Survey Report BAKER +N's HUGHES Company: North America- ALASKA- BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft Site: PS DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM RSK - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Easting DLeg V. Sec (usft) 0 (°) (usft) (usft) (usft) (waft) (usft) (usft) ('1100usft) (usft) 8,375.00 42.44 314.80 7,034.22 6,964.22 2,392.40 -2,326,40 5.931,836.598 716.886.052 0.96 3,261.93 _ 8,400.00 42.20 314.74 7.052.71 6,982.71 2,404.25 -2,338.34 5.931 848.099 716,873.764 0.97 3,278.3' 8,425.00 41.87 314.73 7,071.28 7,001.28 2,416.03 -2,350.24 5,931,859.530 716,861.536 1.32 3,294.61 8,450.00 41.77 314.76 7.089.91 7.019.91 2,427.77 -2,362.08 5,931,870.916 716.849,361 041 3,310.84 8,475.00 41.67 314.79 7,108.57 7.038.57 2,439.49 -2,373.89 5,931,882.285 716.837.216 0.41 3,327.04 8,500.00 41.42 314.78 7.127.28 7.057.28 2,451.17 -2,385.65 5.931,893.618 716.825.114 1.00 3,343.18 8.525.00 41.05 314.68 7.146.08 7,076.08 2.462.76 -2,397.36 5.931,904,870 716,813.076 1.50 3,359.22 8,550.00 40.96 314.60 7.164.94 7,094.94 2.474.29 -2409.03 5.931.916.053 716,801.073 0.35 3.375.18 8.575.00 40.94 314.47 7,183.82 7,113.82 2,485.79 -2.420.72 5,931,927.203 716,789,063 0.38 3,391.12 8,800.00 40.75 314.28 7,2D2.73 7,132.73 2,497.22 -2.432.40 5.931,938.293 716,777.050 0.91 3,407.01 8,625.00 40.45 314.10 7,221.72 7,151.72 2,508.56 -2.444.07 5,931.949.289 716,765.060 1.29 3,422.81 8,650.00 40.18 313.95 7,240.78 7,170.78 2,519.80 -2,455.70 5.931 ,960.187 716,753.109 1.15 3,438.51 8,675.00 40.10 313.83 7.259.89 2189.89 2,530.97 -2.467.31 5.931,971.015 716,741.175 0.45 3,454.14 8,700.00 40.27 313.80 7,278.99 7,208.99 2,542.14 -2.478.95 5,931,981.843 716.729.216 0.68 3.469.78 8,725.00 40.49 313.83 7,298.03 7228.03 2,553.38 -2.490.64 5,931.992.712 716,717.209 0.88 3,48549 8.750.00 40.71 313.89 7.317.02 7,247.02 2,564.63 -2.502.37 5,932,003.639 716 705.157 0.89 3.501.27 8,775.00 40.96 314.00 7,335.93 7.265.93 2,575.97 -2.514.14 5,932,014.636 716.693.063 1.04 3,517.1" 8,800.00 41.27 314.05 7,354.77 7,284.77 2.587.40 -2.525.96 5,932.025.712 716.680.916 1.25 3.533.08 8,825.00 41.64 314.05 7,373.50 7.303.50 2,598.91 -2,537.86 5,932.D36.869 716,668.692 148 3,549.14 8,850.00 42.02 314.25 7,392.13 7,322.13 2,610.52 -2.549.82 5.932,048.130 716656.397 1.61 3,565.33 8,875.00 42.19 314.32 7.410.68 7,340.68 2,622.22 -2,561.82 5.932,059.480 716,644.063 0.71 3,581.62 8,900.00 42.49 314.42 7.429.16 7,359.16 2,634.00 -2.573.86 5.932,070.899 716,631.690 1.23 3,597.98 8.925.00 42.91 314.59 7447.53 7.377.53 2,645.88 -2.585.95 5,932,082.427 716,619.260 1.74 3.614.47 8,950.00 43.26 314.81 7,465.79 7,395.79 2,657.89 -2,598.09 5,932,094.081 716.606.778 1.52 3,631.09 8,975.00 43.43 315.05 7,483.97 7413.97 2,670.01 -2,610.24 5,932.105.841 716,594.284 0.95 3.647.81 9.000.00 43.63 315.27 7.502.10 7.432.10 2.682.22 -2,622.38 5.932,117.692 716,581.794 1.00 3.664.60 9.025.00 43.91 315.31 7.520.15 7.450.15 2,694.51 -2634.54 5,932,129.624 716,569.276 1.13 3,681.47 31212016 3:37:59PM Page 12 COMPASS 5000.1 Build 61 4..4a, BP rl.g =,t4 !bp Final Survey Report BAKER HUGHES Company: North America- ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft Site: PB DS 16 MD Reference: orkb @ 70,00usft Well: 1615 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM RSK - Alaska PROD - ANCP1 Survey MD Inc Azi(azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (1 (1) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) 9,050.00 44.08 315.30 7538.13 7,468.13 2.706.86 -2,646.76 5,932,141.608 716,556,710 0.68 3,698.4, 9.075.00 44.35 315.38 7,556.05 7,486.05 2,719.26 -2.659.01 5,932,153.646 716,544,101 1.10 3,715.42 9,100.00 44.71 315.49 7,573.87 7,503.87 2.731.75 -2,671.31 5.932,165.774 716,531.442 1.47 3732.54 9,125.00 45.03 315.56 7.591.59 7,521.59 2,744.33 -2,683.67 5,932,177.995 716,518.725 1.30 3,749.76 9,150.00 45.24 315.63 7.609.23 7,539.23 2,756.99 -2,696.07 5,932,190.288 716,505.965 0.86 3,767.07 9,175.00 45.37 315.66 7,626.81 7,556.81 2,769.70 -2,708.49 5,932,202.628 716,493.178 0.53 3,784.43 9,200.00 45.72 315.70 7.644.32 7,574.32 2,782.47 -2,720.96 5.932,215.027 716,480.345 1.40 3,801.86 9,225.00 46.11 315.70 7,661.71 7,591.71 2,795.32 -2,733.50 5,932,227.509 716,467.436 1.56 3,819.41 9,250.00 46.42 315.68 7,679.00 7.609.00 2,808.24 -2.746.12 5,932,240.063 716,454.448 1.24 3,837.06 9,275.00 46.63 315.70 7.696.20 7,626.20 2,82L23 -2,758.79 5,932,252,670 716,441.404 0.84 3,854.78 9,300.00 46.79 315.75 7,713.34 7.643.34 2,834.26 -2,771.50 5,932,265.325 716,428.328 0.66 3,872.57 9,325.00 47.19 315.78 7,730.39 7.660.39 2,847,35 -2,784.25 5,932,278.046 716,415.201 1.60 3,890.43 9.350.00 47.52 315.81 7,747.33 7,677.33 2,860.54 -2,797.07 5,932,290.850 716,402.003 1.32 3,908.41 9,375.00 47.69 315,84 7,764.16 7,694.18 2,873.78 -2,809.94 5,932,303.712 716,388.759 0.69 3,926.46 9,400.00 47.77 315.84 7,781.00 7,711.00 2,887.05 -2,822.82 5,932,316.603 716,375.491 0.32 3,944.54 9,425.00 47.87 315.82 7,797.79 7,727.79 2,900.34 -2,835.73 5,932,329.510 716,362.203 0.40 3,962.6t 9,450.00 48.10 315.76 7.814.52 7744.52 2,913.65 -2,848.68 5,932,342.442 716,348.871 0.94 3,980.61 9,475.00 48.22 315.67 7,831.20 7,761.20 2,926.98 -2,861.69 5,932,355.391 716,335.485 0.55 3,999.01 9,500.00 48.26 315.60 7,847.85 7,777.85 2,940.32 -2.874.73 5,932,368.338 716,322.064 0.26 4,017.23 9,525.00 48.30 315.51 7,864.48 7,794.48 2,953.64 -2,887.80 5,932,381.274 716,308.617 0.31 4.035.45 9,550.00 48.41 315.40 7.881.10 7,811.10 2,966.95 -2.900.90 5,932.394.202 716,295.132 0.55 4,053.69 9.575.00 48.61 31529 7.897.66 7.827.66 2,980.27 -2.914.06 5,932,407.135 716,281.589 0.87 4,071.96 9,600.00 48.72 315.27 7.914.17 7,844.17 2,993.61 -2,927.27 5,932,420.064 716,268.000 0.44 4,090.27 9.625.00 48.32 315.30 7.930.73 7,860.73 3,006.92 -2,940.45 5,932,433.004 716,254.442 1.60 4,108.55 9.650.00 48.07 315.32 7,947.39 7,877.39 3,020.17 -2,953,55 5,932,445.866 716,240.957 1.00 4,126.73 9,675.00 47.96 315.37 7.964.12 7,694.12 3,033.39 -2,966.61 5,932,458.699 716,227.519 0.46 4,144.86 9,700.00 47.86 315.41 7,980.87 7,910.87 3,046.60 -2,979.64 5,932,471.522 716.214.112 0.42 4,162.97 3/22016 3:37'59PM Page 13 COMPASS 5000.1 Build 61 BID ON as by Final survey Report BAKER N HUGHES Company: North America - ALASKA- BP Project: Prudhoe Bay Site: PS DS 16 Well: 16-15 Wellbore: 16-15A Design: 16-15A Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 16.15 orkb @ 70.00ustl orkb @ 70.00us0 Tme Minimum Curvature EDM R5K-Alaska PROD -ANCP1 Survey MD Inc (usft) (°) 9,725.00 9,750.00 47.62 47.21 Axl (azimuth) (9 315.40 315.37 TVD (usft) 7,997.69 8,014.60 TVDSS (usft) 7.927.69 7.944.60 NIS (usft) 3,059.77 3,072.88 EfW (usft) -2,992.63 -3,005.56 Northing (usft) 5.932 484.314 5932,497.036 Easting (raft) 716.200.745 716.187.443 DLeg (°I100usft) 0.96 1.64 V. Sec (usft) 4.181.03 4,198.9' _ 9,775.00 47.22 315.30 8.031.58 7.961.58 3,085.92 -3,018.46 5.932,509.705 716.174.173 0.21 4,216.89 9.800.00 47.04 315.26 8.048.59 7,978.59 3,098.94 -3,031.35 5,932,522.343 716,160.908 0.73 4,234.77 9.825.00 46.74 315.30 8.065.68 7.995.68 3,111.91 -3,044.19 5,932,534.933 716,147.695 1.21 4,252.57 9.850.00 46.49 315.29 8,082.85 8,012.85 3,124.83 -3,056.98 5.932,547.469 716.134.545 1.00 4,270.30 9.875.00 46.36 315.18 8.100.08 8.030.08 3,137.68 -3,069.73 5.932,559.952 716,121.423 0.61 4,287.96 9.900.00 46.19 315.18 8,117.36 8,047.36 3.150.50 -3.082.46 5,932,572.391 716,108.322 0.68 4,305.58 9,925.00 45.86 315.31 8.134.72 8.064.72 3,163.28 -3.095.13 5,932.584.793 716.095.290 1.37 4.323.13 9,950.00 45.43 315.44 8,152.20 8,082.20 3,176.00 -3.107.69 5,932,597.145 716.082.370 1.76 4,340.57 9,975.00 45.20 315.55 8,169.78 8,099.78 3,188.67 -3,120.15 5,932,609.454 716.069.548 0.97 4,357.93 10,000.00 45.14 315.65 8,18740 8.117.40 3,201.34 -3,132.55 5,932,621755 716.056.781 0.37 4,375.25 10.025.00 45.06 315.75 8.205.05 8,135.05 3.214.02 -3,144.92 5,932.634.064 716,044.051 0.43 4,392.55 10.050.00 44.77 315.82 8.222.76 8,152.76 3,226.67 -3.157.23 5.932,646.352 716.031,380 1.18 4409.80 10,075.00 44.59 315.96 8,240.53 8.170.53 3,239.29 -3.169.47 5.932,658.612 716,018.784 0.82 4,426.99 10.100.00 44.43 316.06 8,258.36 8,188.36 3,251.90 -3,181.64 5,932,670,862 716.006.251 0.70 4,444.14 10,125.00 44.20 316.28 8,276.25 8.206.25 3,264.50 -3,193.73 5,932,683.104 715,993.796 1.11 4461.2' 10.150.00 43.83 316.61 8,294.23 8.224.23 3,277.09 -3,205.70 5,932,695.340 715,981,466 1.74 4,478.25 10,175.00 43.34 316.98 8,312.34 8,242.34 3,289.65 -3,217.50 5.932,707.554 715,969.307 2.21 4,495.16 10,200.00 42.95 317.33 8.330.58 8,260.58 3,302.18 -3,229.13 5,932,719.745 715,957.323 183 4.511.95 10,225.00 42.72 317.85 8,348.91 8,278.91 3,314.73 -3,240.59 5,932.731956 715,945.500 1.69 4.528.67 10,250.00 42.36 318.31 8.367.33 8.297.33 3,327.31 -3,251.88 5.932,744.199 715,933,848 1.90 4,545.32 - 10,275.00 41.95 318.77 8.385.86 8,315.86 3,339.88 -3,262.99 5,932,756444 715,922.379 2.05 4.561.87 10.300.00 41.65 319.30 8,404.50 8,334.50 3.352.47 -3,273.92 5,932768.704 715,911.094 1.85 4578.33 10,325.00 41.48 319.88 8.423.20 8,353.20 3,365.10 -3,284.67 5.932.781.015 715.899.980 1.68 4.594.74 10,350.00 41.12 320.40 8441.99 8,371.99 3,377.76 -3,295.25 5,932,793.367 715,889.042 1.99 4,611.09 10.375.00 40.68 32102 8,460.88 8,390.88 3,390.43 -3,305.61 5,932,805728 715,878,313 2.39 4,627.32 3/2/2016 3:37:59PM Page 14 COMPASS 5000.1 Build 61 n.b BP RAN 15,00 p Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70, 00usft Site: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Walloons: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM RSK - Alaska PROD - ANCP7 Survey MD Inc Azi (azimuth) TVD TVDSS WS ENV Northing Easting DLeg (usft) (•) (•) (usft) (usR) (11411) (usft) (usft) (usft (•1100usft) 10,400.00 40.48 321.35 8,479.87 8,409.87 3,403.10 -3,315.80 5,932,818.098 715,867.756 1.17 10.425.00 40.38 321.57 8,498.90 8,428.90 3,415.78 -3.325.91 5,932,830.480 715,857,291 0.70 10,450.00 40.29 321.77 8,517.96 8,447.96 3,428.47 -3,335.84 5,932,842.876 715,846.892 0.63 10,475.00 40.22 321.96 8.537.04 8,467.04 3,441.18 -3,345.92 5,932,855,287 715.836.552 0.57 10,500.00 40.29 322.03 8,556.12 8,486.12 3,453.91 -3,355.86 5,932,867.722 715,826.240 0.33 10,525.00 40.15 322.29 8,575.20 8,505.20 3.466.66 -3,365.77 5,932,880,177 715,815.971 0.87 10,550.00 40.29 322.47 8.594.29 8,524.29 3.479.45 -3,375.62 5,932,892.671 715,805.750 0.73 10,575.00 40.45 322.65 8613.34 8,543.34 3,492.30 -3,385.47 5,932,905.236 715,795.537 0.79 10,600.00 40.48 322.86 8.632.36 8,562.36 3,505.22 -3,395.29 5,932,917.861 715,785.347 0.56 10.625.00 40.36 323.06 8.651.39 8,581.39 3,518.16 -3.405.05 5,932,930,510 715,775,212 0.71 10,650.00 40.21 323.19 8,670.46 8,600.46 3,531.09 -3,414.75 5,932,943.153 715,765.141 0.69 10.675.00 40.42 323.31 8,669.53 8,619.53 3,544.05 -3.424.43 5.932,955.826 715.755.091 0.90 10.700.00 40.38 323.45 8,708.57 8,638.57 3,557.05 -3,434.09 5,932,968.544 715,745.053 0.40 10,725.00 40.35 323.78 8,727.61 8,657.61 3,570.09 -3,443.70 5,932,981.294 715,735.074 0.86 10,750.00 40.38 324.12 8.746.86 8,676.66 3,583.18 -3,453.23 5,932,994.102 715,725.170 0.89 10,775.00 40.36 324.26 8,765.71 8,695.71 3,596.31 -3,462.70 5.933,006.953 715.715.319 0.37 10,800.00 39.94 324.33 8,784.82 8,714.82 3,609.40 -3,472.11 5,933,019,763 715,705.535 1.69 10,820.00 39.56 324.20 8,800.19 8.730.19 3,619.78 -3,479.58 5,933,029.923 715,697.768 1.92 10,840.01 40.83 326.00 8,815.48 8,745.48 3,630.37 -3,486.96 5,933,040.296 715,690.078 8.58 10,870.11 44.12 336.00 8.837.71 8,767.71 3,648.28 -3,496.41 5,933,057.920 715,680.117 29.01 10,900.70 52.00 349.00 8.858.18 8,788.18 3,670.06 -3,502.72 5,933,079.502 715,673.179 37.07 10.932.01 56.23 2.20 8.876.58 8.806.58 3,695.25 -3,504.58 5,933,104.634 715,670,587 36.69 10,960.19 59.08 14.12 8,891.69 8,82169 3,718.75 -3,501.17 5,933,128.214 715,673.311 37.11 10,990.48 62.60 23.14 8,906.47 8.836.47 3,743.76 -3,492.70 5,933,153.459 715,681.051 28.47 11,020.27 70.21 27.87 8,918.39 8.848.39 3,768.36 -3,480.93 5,933,178.387 715,692.102 29.39 11,048.66 79.63 32.98 8,925.78 8,855.78 3,791.94 -3,467.05 5,933.202.368 715.705.295 37.45 11,080.23 83.85 41.99 8930.32 8,860,32 3,816.69 -3448.05 5,933,227.659 715,723.566 31.24 V. Sec (usft) 4,643.4'. --, 4,659.58 4,67566 4,69133 4,707.79 4,723.85 4 739.92 4,756.04 4,772.20 4,788.35 4,804.45 4,820.57 4,836.72 4,852.87 4,869.02 4,885.1. - 4,901.26 4,914.03 4,926.92 4,947.11 4,968.92 4,991.27 5,009.38 5,026.10 5,040.71 5,053.35 5.064.26 3/2/2016 3:37'59PM Page 15 COMPASS 5000.1 Build 61 BP RAW f� by Final Survey Report NU6MES Company: North America - ALASKA- BP Local Coordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft Site: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature -3,401.16 5,933,265.349 Database: EDM R5K - Alaska PROD - ANCPt Design: 16-15A 11,170.25 Survey MD (usft) 11,110.23 Inc )°) 84.99 Azi (azimuth) (°) 52.51 TVD (usft) 8,933.25 TVDSS (usft) 8,863.25 NIS (usft) 3,836.93 ENV (usft) -3.426.15 Northing (usft) 5.933.248.522 Easting (usft) 715744.864 DI -eq (°1100uaft) 35.11 V. Sec (uaft) 5,069.81 11,140.07 87.14 61.87 8,935.30 8,865.30 3,853.04 -3,401.16 5,933,265.349 715769.377 32.11 5,070.2 11,170.25 88.43 72.39 8.936.47 8,866.47 3.864.74 -3,373.41 5,933,277.852 715,796.772 35.09 5,065.42 11.200.28 92.76 82.08 8.936.15 8.866.15 3.871.37 -3.344.17 5,933.285.324 715.825.810 35.33 5,055.53 11.230.42 93.75 93.05 8,934.44 8,864.44 3.872.55 -3.314.15 5.933.287473 715,855.776 36.49 5,040.70 11,260.19 94.88 103.91 8,932.19 8,862.19 3,868.28 -3.284.83 5,933,283.958 715.885.206 36.57 5,021.45 11,280.40 96.58 110.64 8,930.17 8,860.17 3,862.31 -3.265.64 5,933,278.552 715,904.561 34.18 5.006.22 11.300.40 97.32 113.45 8,927.75 8.857.75 3,854.86 -3,24724 5,933;271.639 715.923.168 14.43 4,990.15 11,330.20 99.69 110.07 8.923.34 8,853.34 3,843.94 -3,219.88 5,933,261.513 715.950.838 13.75 4,966.37 11,360.50 101.43 106.29 8.917.79 8.847.79 3.634.64 -3.191.59 5.933,253.044 715.979.387 13.54 4,943,49 11390.31 102.97 102.83 8,911.49 8.84149 3,827.32 -3.163.39 5,933.246.541 716,007.781 1247 4.922.33 11.410.28 103.63 100.13 8,906.89 8.836.89 3,823.45 -3,144.35 5.933,243.227 716,026.928 13.57 4,908.95 11.430.28 103.79 97.44 8,902.15 8,832.15 3,820.48 -3.125.15 5,933,240.819 716.046.206 13.09 4,896.26 11.460.51 102.69 93.34 8,895.22 8.825.22 3.817.72 -3,095.86 5,933,238.910 716,075.561 13.69 4,878.39 11490.68 100.90 87.69 8.889.05 8,819.05 3.817.46 -3,066.34 5,933,239.506 716,105.073 19.27 4,862.51 11.520,63 100.40 83.90 8.883.52 8813.52 3,819.62 -3.036,99 5.933.242.516 716,134.345 12.55 4.848.78 11.550.56 100.71 79.09 8.878.03 8,808.03 3,823.97 -3,007.90 5933,247.708 716,163.296 15.83 4,837.0 11.580.43 100.22 74.81 8,872.60 8.802.60 3,830.60 -2,979.29 5.933,255.168 716,191.698 14.19 4.827.50 11,610.32 101.50 69.60 8.866.97 8,796.97 3,839.56 -2,951.35 5,933.264.940 716,219.364 17.65 4820.29 11,640.51 98.81 65.97 8.861.64 8.791.64 3.850.80 -2,923.85 5,933,276.969 716.246.528 14.81 4.815.23 11,650.00 97.25 65.10 8.860.32 8,790.32 3,854.69 -2,915.30 5,933.281,107 716,254.963 18.77 4.813.99 KOP Billet 11.680.11 92.33 69.10 8,857.80 8.787.80 3,866.36 -2,887.67 5,933,293.570 716,282239 21.02 4,809.24 11.710.26 93.60 64.45 8.856.24 8,786.24 3.878.23 -2,860.01 5,933,306.237 716,309.544 15.97 4.804.63 11,740.26 92.33 58.37 8.854.69 8,784.69 3,892.56 -2,833.71 5,933,321.324 716,335.408 20.68 4,802.84 11.770.28 90.00 53.29 8.854.08 6.784.08 3,909.41 -2,808.89 5,933.338.888 716,359.730 18.61 4,803.97 11.800.36 90,21 46.68 8.854.02 8.784.02 3,928.74 -2,765.87 5,933,358,878 716.382.183 21.99 4,808.15 3122016 3:37.59PM Page 16 COMPASS 5000.1 Build 61 by Inc BP TVD MANG NIS ENV Final Survey Report Northing BAKER Easting DLeg V. Sec HUGHES Company: North America - ALASKA- BP Local Coordinate Reference: Well 16-15 (usft) Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft Site! PB DS 16 MD Reference: orkb @ 70.00usft - Well: 16-15 North Reference: True 8.783.90 Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc Azl (azimuth) TVD TVDSS NIS ENV Northing Easting DLeg V. Sec (usft) (°) (°) (usft) (usft) (usft) (usft) (usR) (usft) (°1100usft) (usR - 11,830.60 90.25 41.18 8.853.90 8.783.90 3,950.51 -2,764.90 5,933,381.247 716,402.512 18.19 4,815.4E 11,860.32 89.36 36.46 8.854.00 8,784.00 3,973.66 -2,746.27 5,933,404,925 716,420.457 16.16 4,825.24 11,890.47 89.45 30.53 8,854.32 8784.32 3,998.79 -2.729.64 5,933,430.527 716,436.350 19.67 4,837.72 11.920.35 88.28 25.92 8,854.91 8,784.91 4,025.10 -2,715.52 5,933,457.239 716.449.704 15.91 4,852.55 11.950.18 87.73 20.44 8,855.95 8,785.95 4,052.50 -2,703.79 6.933 484.962 716,460,633 18.45 4,869.55 11,980.38 86.40 15.45 8,857.50 8787.50 4,081.18 -2,694.50 5.933,513.901 716.469.086 17.08 4,888.95 12,010.50 85.85 9.57 8.859.53 8,789.53 4.110.50 -2,687.99 5,933,543.401 716,474.738 19.56 4910.36 12,040.38 84.59 4.67 8,862.02 8,792.02 4,140.04 -2,684.30 5.933,573.031 716,477.570 16.88 4,933,44 12,070.37 83.48 358.10 8.865.14 8,795.14 4,169.84 -2,683.58 5,933,602,840 716,477.426 22.10 4,958.33 12,100.40 86.22 351.75 8,867.84 8,797.84 4,199.61 -2,686.22 5,933,632,522 716,473.915 22.95 4,984.98 12,130.28 89.97 346.48 8.868.84 8,798.84 4.228.92 -2.691.86 5,933,661.655 716,467.429 21.64 5,012.82 ! 12,162.84 95.97 340.65 8,867.15 8.797.15 4,260.09 -2701.05 5,933,692.534 716,457.341 25.67 5.044.11 12,190.42 97.42 337.10 8,863.93 8,793.93 4,285.63 -2,710.92 5,933,717.783 716,446.735 13.82 5,071.00 12,220.48 100.69 331.86 8,859.20 8,789.20 4,312.41 -2,723.69 5,933,744.177 716,433.186 20.36 5,100.48 12,250.44 103.63 327.10 8,852.88 8,782.88 4,337.63 -2,738.56 5,933,768.957 716,417.599 18.37 5,129.74 12,28012 106.66 321.84 8,845.13 8,775.13 4,360.94 -2.755.19 5,933,791772 718,400.297 19.92 5,158.3: _ 12,309.96 108.48 318.19 8,836.11 8,766.11 4,382.41 -2,773.83 5,933,812.688 716,381.040 19.05 5,186.41 12,340.34 108.47 315.16 8,826.48 8,756.48 4,403.02 -2,793.96 5.933,832.707 716,360.318 3.22 5,214.56 12,372.46 107.22 322.77 8.816.63 8,746.63 4,426.07 -2,814.01 5,933855.161 716,339.608 22.88 5,24474 12,400.12 105.57 329.25 8,808.81 8,738.81 4,448.06 -2,828.83 5,933,876.711 716,324.157 23.25 5,271.24 12,430.42 100.93 334.29 8.801.87 8,731.87 4,474.04 -2.842.76 5,933,902.269 716,309.478 22.28 5,300.65 12460.55 97.54 340.98 8.797.03 8,727.03 4,501.52 -2,854.06 5,933,929.413 716,297.386 24.63 5,329.94 12,490.18 91.35 343.24 8,794.73 8.724.73 4,529.62 -2.863.13 5,933,957.235 716,287.507 22.23 5,358.57 12.520.59 85.11 342.41 8,795.67 8,725.67 4,558.64 -2,872.10 5,933,985.986 716,277.697 20.70 5,387.94 12.550.22 79,38 340.99 8.799.67 8,729.67 4,586.51 -2,881.31 5,934.013,568 716,267.680 19.91 5,416.45 12,600.00 79.38 340.99 8.808.84 8.738.84 4,632.77 -2,897.25 5,934,059.343 716,250.407 0.00 5,464.12 Projection to TD 31212016 3: 37.59PM Page 17 COMPASS 5000.1 Build 61 Design Annotations BP Measured WG 49 by Depth Depth Final Survey Report -EI-W BAKER Wait) (usft) (usft) Comment 11,650.00 8,860.32 HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 16-15 -2,897.25 Projection to TD Project: Prudhoe Bay TVD Reference: orkb @ 70.00ustt She: PB DS 16 MD Reference: orkb @ 70.00usff Well: 1615 North Reference: True Wellbore: 1615A Survey Calculation Method: Minimum Curvature Database: EDM RSK - Alaska PROD - ANCP 1 Design: 16-15A Casing Points _ Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) —, 2,505.00 2.504.94 13 3/8" 13.375 17.500 10,789.00 8776.40 95/8" 9.625 12.250 Design Annotations Measured Vertical Local Coordinates Depth Depth -NI-S -EI-W (watt) Wait) (usft) (usft) Comment 11,650.00 8,860.32 3,854.69 -2,915.30 KOP Billet 12,600.00 8,808.84 4,632.77 -2,897.25 Projection to TD Approved By: Yosha Ragbirsingh Survey Manager Baker Hughes 322016 3:37:59PM Page 18 COMPASS 5000.1 Build 61 //16 BAKER HUGHES RECEIVEP-1 MAR 0 9 20u1 A0GCC PRINT DISTRIBUTION LIST COMPANY BP Exploration Alaska Inc WELL NAME 16-15APB1 FIELD Prudhoe Bay Unit COUNTY North Slope Borough BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL bakerhughes.com STATUS Final Replacement: COMPANY ADDRESS (FEDEX WILL NOT DELVER TO P.O. BOX) PERSON ATTENTION 21 51 g7 26905 sign and return one copy of this transmittal form to: Exploration (Alaska)Inc :rotechnical Data Center, 1-112-1 DATA LOGGPI1 S /w/2010 E. Benson Blvd. M. K. BENDEFI zhoraae,Alaska 99508 LOG TYPE GR - RES LOG DATE February 27, 2016 TODAYS DATE March 8, 2016 Revision No Details: Requested by: FIELD FINAL CD CD 1 LOGS LOGS (digital/image) Surveys (Final Surveys) # OF PRINTS # OF MINIS # OF COPIES # OF COPIES # OF COPIES 4 1 RP North Slope 1 B EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker 900 E. Benson Blvd. .Anchorage, Alaska 99508 2 ConoeoPhillips Alaska Inc. I) 1 1 Attn: Ricky Elgaricto ATO 3-344 700 G Street Anchorage, AK 99510 3 ExxonMohil, Alaska 1 1 1 Attn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska - AOGCC 1 1 1 Attn: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division of Oil & Gas *** D 1 1 Attn: Sean Clifton 550 West 7th Avenue, Suite 802 Anchorage, Alaska 99501 *** Stamp "confidential' on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Attn: Donald Surles TOTALS FOR THIS PAGE: 0 3 4 5 0 0 TOTALS FOR ALL PAGES: 0 3 4 5 0 0 RECEIVED MAR 0 9 2u,) .�. by AOGOG North America - ALASKA - BP Prudhoe Bay PB DS 16 16-15 16-15APB1 500292147470 Design: 16-15APB1 Final Survey Report 02 March, 2016 'Ado BAKER HUGHES BP rel AI by Final Survey Report BAKER i.« HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 16 Well: 16-15 Wellbore: 16-15APB1 period: 16-15APB1 Local Coordlnate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 16-15 orkb @ 70.00usft orkb @ 70.00usft True Minimum Curvature EDM R5K - Alaska PROD - ANCPt Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 16, TR -10-15 Northing: 5,927,441 990 usft Latitude: 70° 12' 15.545 N Site Position: Easting: 718,969.B80 usft Longitude: 148° 14'4,567 W From: Map 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.66 " Position Uncertainty: Well 16-15, 16-15 - Well Position +N/ -S 0.00 usft Northing: 5,929.512.870 usft Latitude: 70° 12'35.816 N +EI -W 0.00 usft Easting: 719,280.830 usft Longitude: 148" 13'53.802 W Position Uncertainty 0.00 usft Wellhead Elevation: 39.96 usft Ground Level: 36.69 usft Wellbore 16-15APB1 Magnetics Model Name Sample Date Declination Dip Angie Field Strength (nT) BGGM2015 2/112016 1938. 81.03 57,552 Design 16-15APBI Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,800.00 Vertical Section: Depth From (TVD) +NIS +E/ -W Direction (usft) (usft) (usft) (') 30.04 0.00 0.00 30.00 3/2/2016 3:44:37PM Page 2 COMPASS 5000.1 Build 61 (,r, BP EARN^.,r,. Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site. PB DS 16 Well: 16-15 Wellbore: 16-15APB1 Design: 16-15APS1 Survey Program Date 3/2/2016 From To (usft) (usft) Survay (Wellbore) 100.00 10,800.00 GyroData Gyro (16-15) 10.820.00 12,660.53 CTK MWD 4-114' (16-15AP81; Survey Mo Inc Azi (azimuth) (usft) 0 P) 30.04 0.00 0.00 100.00 0.21 282.32 200.00 0.38 258.69 300.00 0.32 247.60 400.00 0.55 227.06 500.00 0.47 216.10 600.00 0.49 165.33 700.00 0.52 148.46 800.00 0.37 155.20 900.00 0.53 144.01 1,000.00 0.52 137.07 1,100.00 0.38 145.44 1,200.00 0.43 102.25 1,300.00 0.48 85.93 1,400.00 0.43 79.70 1,500.00 0.28 95.19 '., 1,600.00 0.41 81.98 1,700.00 0.34 111.60 1,800.00 0.19 41.87 1,900.00 0.34 70.74 2,000.00 0.48 44.16 Tool Name GVD-CT-CMS MWD Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Description Gyrodata contcasing m/s MWD - Standard Well 16-15 orkb Q 70.00usft orkb @ 70.00usft True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (usft) (uaft) (usft) (uaft) (usft) (usft) (°/100ustt) (usft) 30.04 -39.96 0.00 0.00 5,929,512.870 719,280.830 0.00 0.00 100.00 30.00 0.03 -0.13 5,929.512.894 719,280.704 0.30 -0.04 200.00 130.00 0.00 -0.63 5,929,512.853 719,280.201 0.21 -0.31 300.00 230.00 -0.17 -1.21 5,929.512,665 719,279.623 0.09 -0.75 399.99 329.99 -0.60 -1.82 5,929.512.214 719,279.026 0.27 -1.43 499.99 429.99 -1.26 -2.42 5,929,511.539 719,278.452 0.13 -2.30 599.99 529.99 -2.01 -2.55 5,929,510.790 719,278.341 0.41 -3.01 699.98 629.98 -2.81 -2.20 5,929,510.000 719,278.709 0.15 -3.53 799.98 729.98 -3.49 -1.83 5,929,509.331 719,279.102 0.16 -3.94 899.98 829.98 -4.15 -1.42 5,929,508.676 719,279.528 0.18 -4.31 999.97 929.97 -4.66 -0.84 5,929,507.987 719,280.129 0.06 -4.63 1,099.97 1,029.97 -5.47 -0.35 5,929,507.396 719.280.644 0.15 -4.91 1.199.97 1,129.97 -5.82 0.21 5,929,507.060 719,281.209 0.30 -4.93 1,299.96 1,229.96 -5.87 0.99 5.929,507,033 719,281.994 0.14 -4.59 1,399.96 1,329.96 -5.77 1.78 5,929.507.152 719,282.778 0.07 4.11 1.499.96 1,429.96 -5.73 2.39 5.929,507.215 719,283.389 0.18 -3.76 1,599.96 1,529.96 -5.70 2.99 5,929,507.260 719,283.986 0.15 -3.44 1,699.96 1,629.96 -5.76 3.62 5,929,507.219 719.284.617 0.20 -3.18 1,799.95 1.729.95 -5.74 4.01 5,929,507.245 719,285003 0.33 -2.97 1,899.95 1,829.95 -5.52 4.40 5,929.507.477 719,285.387 0.20 -2.58 1,999.95 1,929.95 -5.12 4.97 5,929,507.892 719.285.947 0.23 -1.95 3/2/2016 3:44:37PM Page 3 COMPASS 5000 1 Build 61 SP I/.FAa 3 by Final Survey Report B HUGHES Company: North America - ALASKA- BP Local Coordinate Reference: Well 16-15 Project: Prudhoe Bay ND Reference: orkb @ 70.00ustt MD Reference: orkb @ 70.00usft Site: PB DS 16 Well: 16-15 North Reference: True Wellbore: 16-15APBI Survey Calculation Method: Minimum Curvature Database: EDM RSK - Alaska PROD - ANCP1 Design: 16-15APB1 Survey MD Inc Azl (azimuth) TVD TVDSS NIS EIW Northing Easting DLeg V. Sec (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (4100usft) (usft) (usft) 2,100.00 0.65 55.61 2.099.95 2,029.95 -4.50 5.73 5,929,508.535 719,286,689 0.20 -1.03 _ 2,200.00 0.40 35.31 2.199.94 2.129.94 -3.90 6.40 5.929,509.159 719.287.341 0.31 -01f 2,300.00 0.29 40.88 2,299.94 2,229.94 -3.42 6.77 5.929,509.646 719,287.694 0.11 0.42 2.400,00 0.15 7470 2,399.94 2,329.94 -3.20 7.06 5.929,509.880 719.287.979 0.19 0.76 2,500.00 0.22 127.96 2499.94 2429.94 -3.28 7.34 5.929,509.805 719,288.259 0.18 0.83 2.600.00 0.07 231.74 2.599.94 2,529.94 -3.44 7.44 5.929,509.651 719.288.368 0.25 0.74 2,700.00 0.19 104.55 2.699.94 2.629.94 -3.52 7.55 5.929,509.575 719.288,483 0,24 0.73 2,800.00 141 327.64 2.799.93 2,729.93 -2.52 7.06 5.929,510.557 719,287956 1.55 1.35 2,900.00 4.02 310.17 2.899.81 2,829.81 0.78 3.72 5.929.513.760 719,284.524 2.71 2.54 3,000.00 5.00 315.88 2,999.50 2,929.50 6.17 -1.99 5,929.518,981 719,278.658 1.08 4.35 3,100.00 5.48 314.41 3,099.08 3,029.08 12,64 -8.44 5,929,525.261 719,272.028 0.50 6.73 3,200.00 7.30 328.59 3,198.46 3,128.46 2141 -15.16 5.929,533.826 719.265.054 2.40 10.96 3,300.00 9.88 316.02 3,297.34 3,227.34 33.01 -24.43 5,929,545.151 719,255.451 3.18 16.37 3,325.00 10.78 312.713 3.32193 3,251.93 36.14 -2764 5,929,548.187 719,252.156 4.28 17.48 3,350.00 11.32 309.68 3.346.47 3,276.47 39.29 -31.24 5,929,551,236 719,248.461 3.21 18.41 3,375.00 11.95 308.44 3.370.96 3.300.96 42.47 -35.16 5,929,554.296 719,244.455 2.71 19.20 3.400.00 72.62 307.67 3.395.39 3.325.39 45.75 -39.35 5.929,557.451 719,240.173 2.76 19.9 3,425.00 13.13 307.86 3,41976 3,349.76 49.16 -43.75 5,929 560,734 719235 672 2.05 20.70 3,450.00 13.50 307.84 3.444.08 3,374.08 52.69 48.30 5,929,564.133 719,231.026 148 21.48 3.475.00 1377 307.93 3468.38 3,398.38 56.31 -52.95 5,929.567.615 719.226.271 1.08 22.29 3,500.00 14.11 308.18 3.492.64 3422.64 60.02 -57.69 5,929,571.188 719,221424 1.38 23.13 3,525.00 14.43 308.46 3.516.87 3446.87 63.84 -62.53 5,929,574.867 719.216.480 1.31 24.03 3,550.00 14.71 308.80 3,541.07 3,47167 67.77 -67.44 5,929,578,649 719,211456 1.17 24.97 3,575.00 14.97 309.16 3,565.23 3,495.23 71.80 -72.42 5,929,582.530 719206.364 1.10 25.97 3,600.00 15.31 309.30 3.589.37 3,519.37 75.93 -77.47 5.929,586.511 719,201.188 1.37 27.02 3.625.00 15.56 309.64 3.613.46 3,543.46 80.16 -82.61 5,929.590.590 719,195.932 1.06 28.11 3,650.00 15.89 310.06 3.637.53 3.567.53 84.50 -87.81 5.929.594 778 719,190.607 1.40 29.27 31212016 3:44: 37PM Page 4 COMPASS 5000. 1 Build 61 BP ri.s by Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft Site: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15APBI Survey Calculation Method: Minimum Curvature Design: 16-15APBI Database: EDM R5K - Alaska PROD - ANCP1 Survey MD Inc AN(azimuth) TVD TVDSS NIS EMI Northing Easting DLeg V. Sec (usft) (ry (1) Wan) (usft) (usft) (usft) (usft) (usft) (°/100usft) (usft)- 3,675.00 16.28 310.59 3,661.55 3,591.55 88.98 -93.09 5,929,599.105 719,185.199 1.67 30.5', 3,700.00 16.79 310.94 3,685.52 3.615.52 93.63 -98.48 5,929,603.593 719,179.678 2.08 31.84 3,725.00 17.41 311.02 3,709.41 3.639.41 98.45 -104.03 5,929,608.250 719,173.991 2.48 33.24 3.750.00 17.86 311.32 3733.24 3.663.24 103.43 -109.73 5.929,613068 719.168.148 1.84 34.71 3,775.00 18.67 311.59 3,756.98 3,686.98 108.62 -115.60 5,929,618.083 719.162.128 3.26 36.27 3,800.00 19.44 311.71 3,780.61 3,710.61 114.04 -121.70 5,929,623.328 719,155.874 3.08 37.92 3,825.00 20.13 311.83 3,804.13 3,734.13 119.68 -128.01 5,929,628.779 719,149.402 2.76 39.64 3,850.00 20.76 311.98 3.827.56 3,757.56 125.51 -134.51 5,929,634.420 719,142.737 2.53 41.44 3.875.00 21.42 312.21 3,850.88 3,780.88 131.55 -141.19 5.929,640.254 719,135.890 2.66 43.33 3,900.00 22.24 312.59 3,874.09 3,804.09 137.81 -148.05 5,929,646.321 719,128.847 3.33 45.33 3,925.00 23.11 312.88 3,897.16 3,827.16 144.35 -155.13 5,929652.652 719,121.582 3.51 47.45 3,950.00 23.74 313.11 3,920.09 3,850.09 151.13 -162.40 5,929,659.216 719,114.119 2.55 49.69 3,975.00 24.43 313.32 3,942.92 3,872.92 158.12 -169.83 5,929.665.983 719,106.485 2.78 52.02 4.000.00 25.22 313.47 3,965.61 3,895.61 165.33 -177.46 5,929,672.969 719,098.652 3.17 54.45 _ 4,025.00 26.03 313.58 3.988.15 3,918.15 172.78 -185.30 5,929,880.184 719,090.600 3.25 56.98 4,050.00 26.74 313.73 4,010.54 3.940.54 180.44 -193.34 5,929,687.616 719,082.343 2.85 59.61 _ 4,075.00 27.46 313.87 4,032.80 3.962.80 188.33 -201.56 5,929,695.257 719,073.899 2.89 62.32. 4,100.00 28.23 313.99 4,054.90 3.984.90 196.43 -209.97 5,929.703.110 719,065.258 3.09 65.13 4,125.00 29.11 314.05 4,076.84 4,006.84 204.76 -218.59 5,929,711.191 719056.395 3.52 68.03 4,150.00 30.00 314.07 4,098.59 4,028.59 213.34 -227.45 5,929,719.505 719,047.289 3.56 7103 4,175.00 30.84 314.08 4.120.14 4,050.14 222.14 -236.55 5,929.728.042 719,037.943 3.36 74.11 4,200.00 31.75 314.16 4,141.51 4,071.51 231.18 -245.87 5,929,736.807 719,028.363 3.64 77.28 4,225.00 32.66 314.22 4.162.66 4,092.66 24047 -255.42 5,929,745,812 719,018.544 3.64 80.54 4,250.00 33.56 314.40 4,183.60 4,113.60 250.01 -265.19 5,929,755.064 719008.500 3.62 83.92 4,275.00 34.35 314.60 4,204.34 4,134.34 259.80 -275.15 5,929,764.557 718,998.261 3.19 87.42' 4,300.00 34.97 314.76 4.224.90 4,154.90 269.80 -285.26 5,929,774.256 718,987.866 2.51 91.02 4,325.00 35.46 314.88 4.245.33 4,175.33 279.96 -295.49 5,929,784.116 718,977.350 1,98 94.71 31212016 3:44:37PM Page 5 COMPASS 5000.1 Build 61 BP Ftel.g by Final Survey Report BAGHES Company: North America - ALASKA- BP Project: Prudhoe Bay Site: PB DS 16 Well: 16-15 Wellbore: 16-15APBI Design: 16-15APB1 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 16-15 ork6 @ 70.00usft ork6 @ 70.00usft True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Survey MD Inc (usR) (ry 4,350.00 4.375.00 35.94 36.56 Azi (azimuth) (') 315.04 315.18 TVD (usft) 4.265.63 4,285.79 TVDSS (usft) 4,195.63 4.215.79 N/S (usR) 290.27 300.74 E/W (Us") -305,81 -316.24 Northing (usft) 5,929,794.120 5,929.804.285 Easting (usft) 71 B,966733 718.956.001 DLeg ('/100usft) 1.96 2.50 V. Sec (usR) 98.47 102.3' 4,400.00 37.36 315.30 4,305.76 4,235.76 311.41 -326.83 5,929,814.646 718945.112 3.21 106.28 4,425.00 38.15 315.28 4,325.53 4.255.53 322.29 -337.60 5.929 825.207 718,934.033 3.16 110.31 4,450.00 39.16 315.25 4.345.05 4,275.05 333.38 -348.59 5,929,835.975 718.922.725 4.04 114.42 4475.00 40.55 315.43 4,364.24 4.294.24 34478 -359.85 5.929,847.039 718,911.139 5.58 118.66 4,500.00 42.00 315.92 4,383.03 4,313.03 356.58 -371.37 5.929,858.497 718.899.279 5.94 123.12 4,525.00 43.24 316.08 4,40143 4,331.43 368.75 -383.13 5,929,870.327 718,887.172 4,98 127.79 4550.00 44.32 316.18 4.419.48 4.349.48 381.22 -395.12 5.929,882.443 718.874,828 4.33 132.59 4,575.00 44.94 316.25 4,437.27 4.367.27 393.90 -407.27 5,929,894.764 718,862.313 2.49 137.50 4,600.00 45.24 316.28 4.454.92 4.384.92 406.70 -419.51 5,929,907,195 718.849.707 1.20 142.45 4.625.00 45.49 316.27 4,47248 4.402.48 419.55 -431.81 5.929.919.688 718,837.043 1.00 147.44 4,650.00 45.73 316.2B 4.489.97 4,419.97 432.46 -444.15 5,929,932.234 718,824,326 0.96 152.45 4.675.00 45.98 316.30 4.507.39 4,437.39 445.43 -456.55 5,929.944.835 718.811.559 1.00 157.48 4,700.00 46.02 316.46 4,524.75 4454.75 458.45 -468.96 5.929,957488 718,798,780 0.49 162.55 4.725.00 46.08 316.57 4.542.10 4472.10 471.51 -481.34 5.929.970.181 718,786.021 040 167.67 4750.00 46.19 316.63 4,559.43 4,489.43 484.60 -493.73 5.929.982.911 718,773,262 0.47 172.8' 4,775.00 46.28 316.70 4,576.72 4.506.72 497.74 -506.12 5,929,995.678 718.760.496 0.41 177.99 4,800.00 46.31 31673 4593.99 4.523.99 510.89 -518.51 5.930,008.468 718,747.729 0.15 18319 4,825.00 46.46 316.71 4,611.24 4,541.24 524.07 -530.92 5.930,021,278 718.734.944 0.60 186.40 4,850.00 46.69 316.76 4.628.42 4.558.42 537.29 -543.36 5.930.034.132 718,722.121 0.93 193.63 4,875.00 46.78 316.83 4,645.56 4.575.56 550.56 -555.82 5.930,047.034 718.709.279 0.41 198.89 4,900.00 46.83 316.87 4.662.67 4.592.67 563.86 -568.29 5,930,059.962 715.696.434 0.23 204.17 4,925.00 4.950.00 46.98 47.02 316.91 317.02 4,679.75 4,696.80 4.609.75 4.626.80 577.18 590.55 -580.76 -593.24 5,930.072.921 5,930.085.917 718.683.577 718.670.717 0.61 0.36 209.47 214.81 4,975.00 47.16 317.04 4.713.82 4,643.82 603.95 -605.72 5,930.098.946 718,657,853 0.56 220.17 5,000.00 47.34 317.06 4,730.79 4.660.79 617.38 -618.23 5,930.112.014 718,644.960 0.72 225.55 31212016 3'44:37PM Page 6 COMPASS 5000.1 Build 61 RE Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 16 Well: 16-15 Wellbore: 16-15APB1 Design: 16-15APB1 Survey MD (usft) 5,025.00 5,050.00 5,075.00 5,100.00 5,125.00 5,150.00 5.175.00 5,200.00 5,225.00 5,250.00 5,275.00 5,300.00 5,325.00 5,350.00 5,375.00 5.400.00 5,425.00 5.450.00 5.475.00 5,500.00 5,525.00 5,550.00 5,575.00 5,600.00 5,625.00 5,650,00 5,675.00 Inc (`) 47.18 46.87 46.75 46.88 47.10 47.36 47.43 47.46 47.63 47.79 47.95 48.11 48.36 48.65 48.90 49.02 49.33 49.61 49.91 50.18 50.27 49.99 49.60 48.53 47.52 46.81 46.42 BP rrA.9 Final Survey Report BAKER HUGHES Local Co-ordinate Reference: Well 16-15 TVD Reference: orkb @ 70 00usft MD Reference: orkb @ 70.00usft North Reference: True Survey Calculation Method: Minimum Cuniature Database: EDM R5K - Alaska PROD - ANCP1 Azi(azimuth) TVD TVDSS Nis WIN Northing Easting (°) (usft) (waft) (usft) (usft) (usft) (usft) 317.18 4,747.76 4,677.76 630.84 -630.73 5,930,125.100 718,632.081 317.40 4.764.80 4,694.80 644.28 -643.13 5,930,138.173 718,619.290 317.66 4,781.91 4,711.91 557.72 -655.44 5,930.151.255 718,606.598 317.89 4,799.02 4,729.02 671.22 -667,69 5,930,164.391 718,593.961 317.97 4,816.07 4,746.07 684.79 -679.94 5,930,177.600 718,581.324 317.99 4,833.05 4,763.05 698.43 -692.22 5,930,190.870 718,568.649 318.07 4,849.97 4,779.97 712.11 -704.53 5.930,204.188 718,555.952 318.14 4,866.88 4,796.88 725.82 -716,83 5.930,217.532 718,543.263 318.14 4,883.75 4.813.75 739.55 -729.14 5,930,230,906 718,530.561 318.05 4.900.58 4,830.58 753.32 -741.49 5.930.244.305 718,517.815 317.41 4,917.35 4.847.35 767.04 -753.96 5,930,257.656 718,504.951 316.45 4,934.07 4,864.07 780.62 -766.65 5,930,270.859 718,491.870 315.95 4.950.72 4,880.72 794.07 -779.56 5,930,283.937 718,478.579 315.85 4,967.28 4.897.28 807.52 -792.59 5.930,296.999 718,465.163 315.82 4,983.76 4,913.76 821.01 -805.69 5,930,310.100 718,451,677 315.74 5,000.17 4,930.17 834.52 -818.84 5,930,323.226 718,438.140 315.76 5,016.52 4,946.52 848.07 -832.04 5,930.336.387 718,424.552 315.75 5.032.76 4,962.76 861.69 -845.30 5,930,349.608 718,410.905 315.75 5,048.91 4,978.91 875.36 -858.61 5,930.362.884 718,397.198 315.71 5.064.97 4,994.97 889.08 -871.99 5.930,376.212 718,383.429 315.51 5.080.96 5,010.96 902.81 -885.43 5,930,389.545 718,369.595 314.85 5.096.99 5.026.99 916.42 -898.96 5,930,402.757 718.355.682 314.19 5,113.13 5.043.13 929.81 -912.57 5,930,415.743 718,341.686 313.19 5,129.51 5,059.51 942.85 -926.23 5,930428.386 718,327.659 312.46 5,146.23 5.076.23 955.49 -939.86 5,930440.619 718,313.668 312.14 5.163.22 5,093.22 967.82 -953,42 5,930,452.558 718,299.756 312.10 5,180.39 5,110.39 980.01 -966.89 5,930,464.346 718,285.932 DLeg V. Sec (1100usft) (usft) -- 0.73 230.9E - 1.40 236.40 0.90 241.89 0.85 247.45 0.91 253.08 1.04 258.74 0.37 264.44 0.24 270.16 0.68 275.90 0.69 281.65 2.00 287.29 2.93 292.71 1.80 297.91 1.20 303.04 1.00 308.17 0.54 313.3[ - 1.24 318.43 1.12 323.59 1.20 328.77 1.09 333.97 0.71 339.14 2.32 344.16 2.55 348.95 5.24 353.42 4.59 357.55 2.99 361.45 1.56 365.27 31212016 3: 44: 37PM Page 7 COMPASS 5000.1 Build 61 BP WEaa by Final Survey Report BAKER HUGHES Company: North Amenca-ALASKA - BP Project: Prudhoe Bay Site: PB DS 16 Well: 16-15 Wellbore: 16-ISAPB1 Design: 16-15AP81 Local Coordlnate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 16-15 orkb @ 70.00usft orkb @ 70=usft True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Survey MD Inc (usft) 5.700.00 46.51 AN (azimuth) r) 312.07 1VD (usft) 5,197.61 NDSS (usft) 5.127.61 NIS (usft) 992.16 ENV (usft) -980.34 Northing (usft) 5.930.476.097 Easting (usft) 718.272.135 DLeg ('I100nift) 0.37 V. Sec (usft) 369.06 5,725.00 46.52 312.18 5,214.82 5,144.82 1,004.32 -993.80 5.930 48T868 718.258.335 0.32 372.8. 5,750.00 46.41 312.39 5,232.04 5,162.04 1.016.52 -1,007.20 5.930,499.667 718,244.579 0.75 376.73 5,775.00 46.19 312.67 5.249.31 5.179.31 1,028.74 -1,020.52 5.930,511.492 718,230.911 1.20 380.65 5,800.00 46.06 312.90 5,266.64 5.196.64 1,040.98 -1,033.75 5.930,523.343 718.217.336 0.84 384.64 5.825.00 46,17 312.98 5,283.97 5,213.97 1,053.25 -1,046,94 5,930.535.229 718.203.795 0.50 388.67 5.850.00 46.29 313.01 5,301.26 5,231.26 1,065.56 -1,060.14 5.930,547,151 718,190.239 0.49 392.73 5,875.00 46.26 313.06 5.318.54 5,248.54 1,077.89 -1,073.35 5,930.559.093 718,176.680 0.15 396.81 5.900.00 46.43 313.09 5,335.79 5.265.79 1,090.25 -1,086.57 5,930.571.059 718.163.113 0.61 400.90 5,925.00 46.34 313.14 5,353.04 5.283.04 1,102.62 -1.099.78 5,930.583,040 718.149.547 0.39 405.01 5,950.00 46.15 313.21 5.370.33 5.300.33 1,114.98 -1.112.95 5,930,595.007 718,136.026 0.79 409.12 5,975.00 46.15 313.26 5.387.65 5.317.65 1,127.32 -1.126.08 5,930,606.970 718,122.538 0.14 413.25 6,000.00 46.45 313.28 5.404.92 5.334.92 1,139.71 -1,139.24 5.930,618.970 718.109.024 1.20 417.40 6,025.00 46.21 313.42 5.422.18 5.352.18 1,152.13 -1,152.39 5,930,630.996 718.095,520 1.04 421.57 6,050.00 46.29 313.53 5.439.47 5.369.47 1,164.55 -1.165.50 5.930,643.035 718.082.060 0.45 425.78 6,075.00 46.36 313.76 5.456.73 5,386.73 1,177.03 -1,178.58 5.930,655.129 718,068.620 0.72 430.05 _ - 6,100.00 46.33 314.09 5.473.99 5.403.99 1,189.58 -1.191.61 5,930,667.293 718,055.234 0.96 434.4, 6,125.00 46.22 314.44 5.491.27 5,421.27 1,202.19 -1.204.55 5,930,679.521 718,041.936 1.10 438.85 6,150.00 48.05 314.78 5,508.60 5,438.60 1,214.85 -1,217.38 5.930,691.801 718.028.743 1.19 44340 6,175.00 45.97 315.04 5,525.96 5,455.96 1,227.55 -1,230.12 5.930,704.123 718,015.642 0.81 448.03 6,200.00 46.01 315.25 5.543.33 5473.33 1,240.29 -1,242.80 5,930 716A95 718,002.596 0.62 452.72 6,225.00 46.01 315.46 5.560.69 5,490.69 1,253.09 -1.25544 5,930.728919 717.989.590 0.60 457.49 6,250.00 45.96 31565 5.578.06 5,508.06 1,265.92 -1,268.03 5,930.741.383 717.976.634 0.58 462.31 6,275.00 45.87 315.83 5,595.46 5,525.46 1,278.79 -1,280.56 5,930.753.874 717,963.734 0.63 467.18 6,300.00 45.66 315.98 5,612.90 5.542.90 1,291.65 -1,293.03 5,930,766.370 717,950.902 0.94 472.09 6325.00 45.73 316.05 5,630.36 5,560.36 1,304.52 -1.305.45 5,930.778.876 717,938.109 0.34 477.02 6.350.00 45.80 316.13 5.647.80 5,577.80 1,317.43 -1.317.87 5,930.791414 717,925.318 0.36 481.99 3/2'2016 3'44:37PM Page 8 COMPASS 5000.1 Build 61 by .044 Final BP Survey Report IGam BAKER HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay Site: PB DS 16 Well: 16-15 TVD Reference: MD Reference: North Reference: orkb @ 70.00usft orkb @ 70.00usft True Wellbore: 16-15APB1 Survey Calculation Method; Minimum Curvature Design: 16-15APB1 Database: EDM RSK - Alaska PROD - ANCP1 Survey MD Inc (usft) (°) Az1(azimuth) (°) TVD (usR) TVDSS (-ft) WS (IusR) EIW (usR)usR Northing ( ) Easting (usR) DLeg (°MOOusR) V. Sec (usR) - 6,375.00 45.85 316.23 5,665.22 5,595.22 1,330.36 -1,330.29 5,930,803.985 717,912.533 0.35 486.9' 6,400.00 46.00 316.33 5.682.61 5,612.61 1,343.34 -1.342.70 5.930,816.599 717,899.749 0.67 492.02 6,425.00 46.32 316.42 5,699.93 5.629.93 1,356.40 -1,355.14 5,930,829.284 717,886.935 1.31 497.10 6,450.00 46.66 316.52 5,717.14 5.647.14 1,369.54 -1.367.63 5,930,842.061 717,874.071 1.39 502.24 6,475.00 47.00 316.68 5,734.24 5.664.24 1,382.79 -1,380.16 5,930,854.939 717,861.165 1.44 507.45 6,500.00 47.30 316.76 5.751.24 5,681.24 1,396.13 -1,392.72 5,930,667.911 717,848.218 1.22 512.73 6,525.00 47.63 316.85 5.768.15 5,698.15 1,409.56 -1,405.33 5,930,880.968 717,835.224 1.35 518.05 6,550.00 47.95 316.96 5.784.94 5,714.94 1,423.09 -1,417.98 5,930,894.116 717,822.187 7.32 52344 6,575.00 48.23 317.12 5,8D1.64 5.731.64 1,436.70 -1.430.66 5,930,907.358 717,809,118 1,22 528.89 6,600.00 48.54 317.28 5,818.24 5748.24 1,450.42 -1,443.36 5,930,920.696 717.796.027 1.33 534.42 6,625,00 48.93 317.51 5,834.73 5,764.73 1,464.25 -1,456.08 5,930,934.152 717,782.910 1.71 540.03 6,650.00 49.38 317.61 5,851.08 5,781.08 1,478.20 -1.468.84 5,930,947.732 717,789.749 1.83 545,74 6,675.00 49.73 317.69 5,867.30 5,797.30 1,492.26 -1,481.66 5.930,961.414 717,756.530 1.42 551.51 6,700.00 49.84 317.76 5,883.44 5,813.44 1,506.39 -1,494.50 5,930,975.160 717743.284 0,49 557.32 6,725.00 49.76 317.82 5.899.58 5,829.58 1,520.53 -1,507.33 5,930,988,924 717,730.050 0.37 563.15: 6,750.00 49.90 317.79 5.915.71 5.845.71 1,534.69 -1,520.16 5,931,002.698 717.716.814 0.57 569.Ot ''. 6,775.00 49.97 317.74 5,931.80 5,861.80 1,548.85 -1,533.02 5,931,016.484 717,703.548 0.32 574.83 6,800.00 49.89 317.70 5,947.89 5,877.89 1,563.01 -1,545.89 5,931,030.258 717,690.273 0.34 580.66 6.825.00 49.66 317.66 5,964.03 5,894.03 1,577.12 -1,558.74 5,931,043.992 717,677.017 0.93 586.45 6,850.00 49.48 317.61 5.980.25 5,910.25 1,591.18 -1,571.57 5.931,057.673 717,663.792 0.74 592.22 6,875.00 49.42 317.55 5.996.50 5,926.50 1,605.20 -1,584.38 5,931,071.318 717,650.577 0.30 59296 6,900.00 48.94 317.42 6,012.84 5.942.84 1,619.15 -1.597.17 5,931.084.886 717637.393 1.96 603.64 6,925.00 48.93 317.37 6,029.27 5,959.27 1,633.02 -1,609.93 5,931,098.382 717,624.236 0.16 609.28 6,950.00 48.78 317.35 6,045.71 5.975.71 1,646.87 -1.622.68 5,931,111.854 717,611.087 0.60 614.89 6,975.00 48.61 317.31 6,062.22 5,992.22 1,660.68 -1,635.41 5,931,125.287 717,597.963 0.69 620.49 7,000.00 48.52 317.26 6.D78.76 6,008.76 1,674.45 -1,648.12 5,931,138,682 717,584.855 0.39 626.06 7.025.00 -_ 48.56 317.22 6.095.31 6,025,31 1,688.21 -1.660.84 5,931,152.062 717,571.742 0.20 631.61 3/2/2016 3: 44.37PM Page 9 COMPASS 5000. 1 Build 61 Survey MD (usft) 7,050.,,00 7,075.00 Inc (°) 48.62 48.59 BP RAN (Mi by NIS (usft) 1,701.97 1.715.74 Final Survey Report BAKER � 011 DLeg (°1100usft) 0.24 0.12 V. Sec (usft) 637.16 1 642.7" 7,100.00 HUGHES Company: NOM America -ALASKA- BP Local Co-ordinate Reference: Well 16-15 1729.49 Project: Prudhoe Bay TVD Reference: orkb @ 70.00us11 Site: PB DS 16 MD Reference: orkb @ 70.00usft 7.125.00 Well: 16-15 North Reference: True 6.091.52 Wellbore: 16-15APS1 Survey Calculation Method: Minimum Curvature 5,931.205.578 717.519,278 Database: EDM RSK - Alaska PROD - ANCP 1 653.81 Design: 16-15APB1 317.37 6,17612 Survey MD (usft) 7,050.,,00 7,075.00 Inc (°) 48.62 48.59 Aid (azimuth) (°) 317.23 317,22 ND (usft) 6,111.85 6.128.38 NDSS (usft) 6.041.85 6058.38 NIS (usft) 1,701.97 1.715.74 EIW (usft) -1,673.58 -1.686.31 Northing (usft) 5,931,165449 5,931,178,839 Easting (usft) 717.558.615 717,545.484 DLeg (°1100usft) 0.24 0.12 V. Sec (usft) 637.16 1 642.7" 7,100.00 48.48 317.23 6.144.93 6,074.93 1729.49 -1,699.04 5,931.192.214 717.532.368 0.44 648.26 7.125.00 48.41 317.28 6.161.52 6.091.52 1.743.23 -1,711.73 5,931.205.578 717.519,278 0.32 653.81 7.150.00 48.38 317.37 6,17612 6.108.12 1,756.97 -1.724.40 5.931.218.947 717,506.213 0.29 659.38 7.175.00 48.35 317.45 5,194.73 6.124.73 1,770.73 -1,737.05 5.931.232.329 717,493.175 0.27 664.97 7.20000 48.23 317.51 6.211.36 6,141.36 1784.48 -1,749.66 5.931,245712 717.480.168 0.51 670.58 7225.00 48.10 317.59 6.228.04 6,158.04 1,798.23 -1,762.23 5,931.259.085 717,467.203 0.57 676.19 7,250.00 47.95 317.64 6.244.76 6.174.76 1.811.95 -1,774.76 5.931.272.443 717,454.281 0.62 681.82 7275.00 47.84 317.69 6.261.52 6,191.52 1,825.66 -1,787.25 5,931.285.784 717441,397 046 687.44 7,300.00 47.74 317.74 6,278.31 6.208.31 1.839.36 -1,799.71 5.931 299,115 717,428.547 0.43 693.08 7,325.00 47.62 317.78 6.295.15 6,225.15 1.853.05 -1,812.14 5,931,312.433 717415.729 0.49 698.72 7.350.00 47.45 317.83 6.312.02 6.242.02 1,866.71 -1,824.53 5.931,325.730 712402.951 0.70 704.36 7,375.00 47.38 317.64 6.328.94 6.258.94 1.880.36 -1,836.88 5,931.339.009 717,390.205 0.28 709.99 7,400.00 47.36 317.79 6,345.87 6.275.87 1.893.98 •1849.23 5,931,352.273 717.377.463 0.17 715.62 - 7,425.00 7.450.00 47.32 47.22 31779 317.81 6.362.81 6.379.76 6.292.81 6.309.78 1,907.60 1,921.21 -1.861.59 -1,873.92 5.931,365.525 5931.378.765 717.364.721 717,351.997 0.16 0.40 721.24 726.8' 7475.00 47.05 317.79 6,396.78 6,326.78 1,934.78 -1,886.23 5,931.391.975 717,339.300 0.68 732.45 7,500.00 46.77 317.76 6.413.86 6,343.86 1.948.30 -1,898.50 5,931,405.132 717.326.643 1.12 738.03 7,525.00 46.76 317.76 6430.99 6,360.99 1,96179 -1,910.74 5,931.418.257 717.314.016 0.07 743.59 7550.00 46.69 317.73 6.448.13 6,378.13 1975.26 -1,922.98 5.931431.370 717.301.393 0.32 749.14 7,575.00 46.56 $17.65 6,465.29 6.395.29 1,988.70 -1,935.21 5.931444.447 717.288.777 0.57 754.66 7,600.00 46.43 317.58 6,482.51 6,412.51 2,002.09 -1,947.43 5,931,457 479 717,276.170 0.56 760.15 7,625.00 46.34 317.50 6,499.75 6,429.75 2,015.45 -1,959.65 5,931,470.471 717263.569 0.43 765.60 7.650.00 46.17 31740 6,517.04 6.447.04 2,028.75 -1.971.87 5,931483.415 717.250.975 0.74 771.02 7,675.00 45.99 317.29 6,534.38 6.464.38 2.041.99 -1.984.07 5,931.496.298 717,238.395 0.79 776.39 7,700.00 45.84 317.18 6,551.77 6,48177 2,055.18 -1.996.26 5.931.509,122 717,225.824 0.68 781.71 3/212016 3:44:37PM Page 10 COMPASS 5000.1 Build 61 ,Nab by BP FIIRG Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft Site: PB DS 16 MO Reference: orkb @ 70,00usft Well: 16-15 North Reference: True Wellbore: 16-15APB1 Survey Calculation Method: Minimum Curvature Design: 16-15APB1 Database: EDM R5K - Alaska PROD - ANCPI Survey (usft) (usft) MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Pasting DLeg V. Sec (usft) (°) (') (usft) (usft) (waft) Just) (usft) (usft) ('1100usit) (usft) 7,725.00 45.83 317.06 6,569.19 6,499.19 2,068.32 -2,008.46 5,931,521.903 717,213.245 0.35 786.9: - 7,750.00 45.79 316.90 6,586.62 6,516.62 2,081.43 -2,020.69 5,931,534.647 717,200.641 0.49 79222 7,775.00 45.61 316.71 6,604.08 6,534.08 2,094.47 -2,032.94 5,931,547.329 717,168.021 0.90 797.39 7,800.00 45.48 316.54 6,621.58 6,551.58 2,107.44 -2,045.20 5,931,559.939 717,175.394 0.71 802.50 7,825.00 45.21 316.39 6.639.16 6,569.16 2,120.33 -2,057.45 5,937 572.469 717,162,776 1.16 807.54 7,850.00 44,99 316.21 6,656.80 6,586.80 2,133.14 -2,069.68 5,931.584.911 717.150.176 1.02 812.51 7,875.00 45.01 316.02 6,674.48 6,604.48 2,145.88 -2.081.93 5,931,597.290 717,137.557 0.54 817.42 7,900.00 45.11 315.87 6,692.14 6,622.14 2,158.59 -2,094.24 5.931,609,644 717,124.889 0.58 822.28 - 7,925.00 45.07 315.76 6,709.79 6.639.79 2,171.29 -2,106.58 5,931,621.977 717.112.186 0.35 827.10 7,950.00 44.84 315.68 6,727.48 6.657.48 2,183.94 -2,118.91 5,931,634.259 717,099.492 0.95 831.89 7,975.00 44.78 315.59 6,745.22 6,675.22 2,196.$3 -2131.23 5,931,646.491 717,086.812 0.35 836.64 8,000.00 44.72 315.50 6,762.97 6,692.97 2209.10 -2,143.56 5.931,658.690 717.074.127 0.35 841.35 8,025.00 44.55 315.40 6,780.76 6,710.76 2,221.61 -2,155.88 5,931670.844 717,061.447 0.74 845.03 8,050.00 44.35 315.31 6,798.61 6,728.61 2,234.07 -2,168.18 5.931,682.937 717,048.789 0.84 850.67 8,075.00 44.21 315.27 6,816.51 6,746.51 2,246.47 -2,180.46 5,931,694.979 717,036.155 0.57 855.27 8,100.00 44.18 315.19 6,834.43 6,764.43 2,258.85 -2.192.74 5.931,706.989 717,023,528 0.25 859.8. ._ 8,125.00 44.16 315.15 6,852.36 6,782.36 2,271.20 -2,205.02 5,931718.981 717,010.894 0.14 864.41 8,150.00 44.01 315.05 6,870.32 6,800.32 2,283.52 -2,217.29 5.931,730,939 716,998.264 0.66 868.94 8,175.00 43.76 315.02 6.888.34 6,818.34 2,295.76 -2,229.54 5,931,742.839 716,985.667 1.00 87344 8.200.00 43.54 315.04 6,906.43 6,836.43 2,307.99 -2.241.74 5,931,754.688 716,973.123 0.88 87791 8.225.00 43.47 315.03 6.924.56 6,854.56 2,320.17 -2.253.90 5,931,766.506 716,960.613 0.28 882.37 8,250.00 43.45 314.95 6.942.71 6,872.71 2,332.32 5,931,778.305 -2.266.06 716,948.104 0.23 886,82 8,275.00 43.22 314.93 6,960.89 6.890.89 2,344.44 -2,278,20 5,931,790.065 716,935.613 0.92 891.25 8,300.00 42.98 314.90 6,979.14 6,909.14 2,356.50 -2,290.30 5,931,801.769 716,923.172 0.96 895.64 8.325.00 42.84 314.85 6,997.46 6,927.46 2,368.51 -2,302.36 5,931,813.423 716,910.767 0,58 900.01 8,350.00 42.68 314.82 7.015.81 6,945.81 2,380.48 -2,314.40 5,931,825.035 716,898.389 0.65 904.36 8,375.00 42.44 314.80 2034.22 6,964.22 2,392.40 -2,326.40 5,931,836.598 716,886.052 0.96 908.68 3/2/2016 3,44r37PM Page 11 COMPASS 5000.1 Build 61 BP I/R\ by Final SurveGR 40�y Report HUGHES Company: Project: Site: Well: Wellbore: Design: North America- ALASKA- BP Prudhoe Bay PB DS 16 16-15 16-15AP51 16-15AP01 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 16-15 orkb @ 70 00usft orkb @ 70.00usft True Minimum Curvature EDM R5K -Alaska PROD - ANCP1 Survey MD Inc (usR) (°) 8,400.00 42,20 Azl (azimuth) (°) 314.74 ND (usft) 7,052.71 TVDSS (us@) 6,982.71 NIS (usR) 2,404.25 EIW (usR) -2,338.34 Northing (bell 5,931,848.099 Easting (us@) 716,873.764 DLeg (°1100usft) 0.97 V. Sec (usft) 912.97 8,425.00 41.87 314.73 7,071.28 7,001.28 2,416.03 -2,350.24 5.931,859.530 716.861.536 1.32 917.2 8.450.00 41.77 314.76 7.089.91 7,019.91 2,427.77 -2.362.08 5,931.870.916 716.849.361 0.41 921.47 8475.00 41.67 314.79 7.106.57 7,038.57 2,439.49 -2,373.69 5,931,882.285 716,837.216 0.41 925.71 8,500.00 41.42 314.78 7.127.28 7.057.28 2,451.17 -2,385.65 5.931T893 618 716.825.114 1.00 929.95 - 8.525.00 41.05 314.68 7,146.08 7,076.08 2.462.76 -2.397.36 5,931,904.870 716.813.076 1.50 934.14 8,550.00 40.98 314.60 7,164.94 7,094.94 2,474.29 -2,409.03 5.931,916.053 716.801,073 0.35 938.28 8,575.00 40.94 314.47 7,183.82 7,113.62 2,485.79 -2.420.72 5,931.927.203 716,789,063 0.38 942.39 8,600.00 40.75 314.28 7202.73 7.132.73 2,497.22 -2,432.40 5,931,938.293 716.777,050 0.91 946.45 8,625.00 40.45 314.10 7,22772 7,151.72 2,508.56 -2,444.07 5.931.949.289 716,765.060 1.29 950.44 8,650.00 40.18 313.95 7.240.78 7.170.78 2,519.80 -2.455.70 5,931,960.187 716,753.109 1.15 954.36 8,675.00 40.10 313.83 7,259.89 7.189.89 2,530.97 -2,467.31 5.931.971.018 716.741.175 0.45 958.23 8.700.00 40.27 313.80 7,278.99 7,208.99 2,542.14 -2,478.95 5,931,981.843 716,729.216 0.68 962.08 8,725.00 40.49 313.83 1298.03 7,228.03 2,553.36 -2,490.64 5,931,992.712 716,717.209 0.88 965.95 8,750.00 40.71 313.89 7.317.02 7,247.02 2.564.63 -2,502.37 5.932,003.639 716,705.157 0.89 969.85 8,775.00 8,800.00 40.96 41.27 314.00 314.05 7,335.93 7,354.77 7.265.93 7.284.77 2,575.97 2,587.40 -2.514.14 -2,525.96 5.932,014.636 5,932,025.712 716,693.063 716,680.916 1.04 1.25 973.79 977.7 8,825.00 4164 31405 7,373.50 7,303.50 2,598.91 -2,537.86 5.932.036.869 716,668.692 1.48 981.79 8,850.00 42.02 314.25 7.392.13 7.322.13 2.610.52 -2.549.82 5.932,048.130 716,656.397 1.61 985.87 8,875.00 42.19 314.32 7.410.68 7.340.68 2.622.22 -2.561.82 5,932.059.480 716.644.063 0.71 990.00 8,900.00 42.49 37442 7.429.16 7,359.16 2.634.00 -2,573.86 5.932.070.899 716,631690 1.23 994.18 8,925.00 42.91 314.59 7.447.53 7,377.53 2,645.88 -2.585.95 5,932,082.427 716,619.260 1.74 998.43 8,950.00 43.26 314.81 7,465.79 7,395.79 2,657.89 -2,598.09 5.932,094.081 716,606.778 1.52 1,002.76 8,975.00 43.43 315.05 7483.97 7,413.97 2,670.01 -2,610.24 5,932,105.841 716,594.284 0.95 1.007.18 9.000.00 43.63 315.27 7,502.10 7.432.10 2,682.22 -2.622.38 5,932,117.692 716,581.794 1.00 1011.68 9,025.00 43.91 315.31 7.520.15 7,450.15 2,694.51 -2,634.54 5,932,129.624 716,569.276 1.13 1,016.25 9,050.00 44.08 315.30 7,538.13 7,468.13 2,706.86 -2,646.76 5,932,141.608 716.556.710 0.68 1,020.83 3/212016 3:44 37P Page 12 COMPASS 5000.1 Build 61 i'°'s by BP NRS ,e0644, Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: P6 DS 16 Well: 16-15 Wellbore: 16.15AP61 Design: 16-15AP81 Survey Local Co-ordinate Reference: Well 16-15 TVD Reference: orkb @ 70 00usft MD Reference: orkb Q 70.00usft North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM R5K - Alaska PROD - ANCPt MD Inc Azi (azimuth) TVD TVDSS Nis EIW Northing Easting DLeg V. Sec (usft) (') (°) (uaft) (usft) (usft) (usft) (usft) Wait) (°I100usft) (usft) --. 9,075.00 44.35 315.38 7,556.05 7,486.05 2,719.26 -2,659.01 5,932,153.646 716,544.101 1.10 1,025.4. - 9,100.00 44.71 315.49 7,573.87 7,503.87 2,731,75 -2.671.31 5,932,165.774 716,531.442 1.47 1,030.11 9,125.00 45.03 315.56 7,591.59 7,521.59 2,744.33 -2.683.67 5,932,177.995 716,518.725 1.30 1,034.83 9,150.00 45.24 315.63 7,609.23 7,539.23 2,756.99 -269607 5,932,190.288 716,505.965 0.86 1,039.59 9.175.00 45.37 315.66 7,626.81 7.556.81 2,769.70 -2,708.49 5,932,202.628 716,493.178 0.53 1,044.38 9,200.00 45.72 315.70 7,644.32 7,574.32 2,782.47 -2,720.96 5,932,215.027 716.480.345 1.40 1,04921 9,225.00 46.11 315.70 7.661.71 7,591,71 2,795.32 -2,733.50 5,932.227.509 716,467.435 1.56 1,054.07 9,25000 46.42 315.68 7.679,00 7.609.00 2,808.24 -2,746.12 5,932,240.063 716.454.446 1.24 1,058,95 9,275.00 46.63 315.70 7.696.20 7,626.20 2,821.23 -2,758.79 5,932,252.670 716,441.404 0.84 1,063.86 9,300.00 46.79 315.75 7.713.34 7,643.34 2,834.26 -2,771.50 5,932,265,325 716,428.328 0.66 1,068.79 9.325.00 47.19 315.78 7,730.39 7,660.39 2,847.35 -2.784.25 5,932,278.046 716,415.201 1.60 1,073.76 9,350.00 47.52 315.81 7,747.33 7.677.33 2,860.54 -2,797.07 5,932,290.850 716.402.003 1.32 1,078.76 - 9,375.00 47.69 315.84 7,764.18 7,894.18 2,873.78 -2,809.94 5,932,303.712 716,388.759 0.69 1,083.80 9,400.00 4777 315.84 7,781.00 7,711.00 2,887.05 -2,822.82 5,932,316.603 716,375.491 0.32 1,088.85 9,425.00 47.87 315.82 7,797.79 7,727.79 2,900.34 4,835.73 5,932,329.510 716,362.203 0.40 1,093.90 - 9,450.00 48.10 315.76 7,814.52 7,744.52 2,913.65 -2,84868 5,932,342.442 716,348.871 0.94 1,098.91 _ 9,475.00 48.22 315.67 7,831.20 7.761.20 2,926.98 -2,861.69 5,932,355.391 716,335.485 0.55 1,104.00 9,500.00 48.26 315.60 7,847.85 7,777.85 2,940.32 -2,874.73 5,932,368.338 716,322.064 0.26 1,109.02 9,525.00 48,$0 315.51 7.864,18 7,794.48 2,953.64 -2,887.80 5,932.381.274 716,308.617 0.31 1.114.03 9,550.00 48.41 315.40 7,881.10 7.811.10 2,966.95 -2,900.90 5,932.394.202 716.295.132 OS5 1,119.01 9,575.00 48.61 315.29 7,897.66 7,827.66 2,98027 -2,914.06 5,932,407.135 716,281,589 0.87 1,123.96 9.60000 48.72 315.27 7,914.17 7,844.17 2,993.61 -2,927.27 5,932.420.084 716,268.000 0.44 1128.91 9,625.00 48.32 315.30 7.930.73 7,860.73 3,006.92 -2,940.45 5,932.433.004 716,254.442 1.60 1,133.85 9,650.00 48.07 315.32 7,947.39 7,877.39 3,020.17 -2,953.55 5,932,445.866 716,240.957 1.00 1,13&77 - 9.675.00 47.96 315.37 7.964.12 7,894.12 3,033.39 -2,966.61 5,932,458.699 716,227.519 0.46 1,143.68 9,700.00 47.86 315.41 7.980.87 7,910.87 3,046.60 -2,979.64 5,932,471.522 716,214.112 0.42 1,148.61 9,725.00 47.62 315.40 7.997.69 7,927.69 3,059.77 -2,992.63 5,932484,314 716,200.745 0.96 1,153.52 3212016 3:44: 37PM Page 13 COMPASS 5000.1 Build 61 BP IGitI by Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Project: Prudhoe Bay Site: PB DS 16 Well: 16-15 Wellborn: 16-15APBI Design: 16-15AP81 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 16-15 orkb @ 70.00usft orkb @ 70.00usft True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Survey MD Inc (usft) M 9,750.00 47.21 AN (azimuth) (°) 315.37 TVD (usft) 8,014.60 TVDSS (usft) 7944.60 NIS (usft) 3.072.88 EIW (usft) -3.005.56 Northing (usft) 5.932.497.036 Easting (usft) 716.187443 DLeg ('HOOusft) 1.64 V. Sec (usft) 1,158.41 9,775.00 9,800.00 9.825.00 47.22 47.04 46.74 315.30 315.26 315.30 8.031.58 8048.59 8.065.68 7,961.58 7978.59 7.995.68 3,085.92 3,098.94 3.111.91 -3,018.46 -3,031.35 -3.044.19 5.932,509.705 5,932,522.343 5.932,534.933 716,174.173 716,160.908 716.147.695 0.21 0.73 1.21 1,163.21 1.168.09 1,172.90 9,850.00 9,875.00 9,900.00 9,925.00 9,950.00 46.49 46.36 46.19 45.86 45.43 315.29 315.18 315.18 315.31 315.44 8,082.85 8.100.08 8,117.36 8.134.72 8.152.20 8.012.85 8.030.08 8,047.36 8,064.72 8,082,20 3,124.83 3,137.68 3.150.50 3,163.28 3,176.00 -3,056.98 -3.069.73 -3,082.46 -3,095.13 -3,107.69 5,932,547.469 5.932,559.952 5,932,572.391 5932.584.793 5,932,597.145 716.134.545 716,121.423 716.108.322 716,095.290 716,082.370 1.00 0.61 0.68 1.37 1.76 1,177.69 1,18245 1.187.18 1,19191 1,196.65 9,975.00 45.20 315.55 8.169.78 8.099.78 3,188.67 -3.120.15 5.932,609.454 716,069.548 0.97 1.201.40 10.000.00 45.14 315.65 8.187.40 8.117.40 3,201.34 -3.132.55 5.932.621.755 716,056.781 0.37 1,206.17 10.025.00 45.06 315.75 8,205.05 8.135.05 3,214.02 -3,144.92 5,932,634.064 716,044.051 0.43 1,210.96 10.050.00 10,075.00 44.77 44.59 315.82 315.96 8,222.76 8.240.53 8,152.76 8.170,53 3,226.67 3.239.29 -3,157.23 -3,169.47 5,932,646.352 5.932,658.612 716,031.380 716,018.784 1.18 0.82 1,215.76 1,220.57 10,100.00 44.43 316.06 8.258.36 8.188.36 3,251.90 -3,181.64 5.932.670,862 716,006.251 0.70 1,225.41 10.125.00 44.20 316.28 8.276.25 8,206.25 3,264.50 -3,193.73 5.932,683.104 715.993.796 1.11 1,230.27 10,150.00 43.83 316.61 8,294.23 8.224.23 3,277.09 -3,205.70 5,932,695.340 715.981.466 1.74 1,235.1' 10,175.00 43.34 316.98 8,312.34 8,242.34 3,289.65 -3.217.50 5,932,707.554 715.969.307 2.21 1,240.17 10.200.00 42.95 317.33 8,330.58 8,260.58 3,302.18 -3,229.13 5.932.719.745 715,957.323 1.83 1,245.21 10.225.00 10,250.00 42.72 42.36 317.85 318.31 8.348.91 8.367.33 8,278.91 8.297.33 3314.73 3,327.31 -3,240.59 -3,251.88 5,932731.956 5.932744.199 715,945.500 715,933.848 1.69 1.90 1,250.35 1255.59 10,275.00 41.95 318.77 8,385.86 8.315.86 3,339.88 -3,262.99 5,932,756.444 715.922.379 2.05 1,260.93 10,300.00 10.325.00 41.65 41.48 319.30 319.88 8404.50 8.423.20 8334.50 8,353.20 3,352.47 3.365.10 -3273.92 -3,284.67 5,932,768.704 5,932,781.015 715,911.094 715.899.980 1.85 1.68 1,266.36 1.271.92 10,350,00 41.12 320.40 8,441.99 8,371.99 3,377.76 -3.295.25 5.932,793.367 715,889.042 1.99 1.277.60 10.375.00 40.68 321.02 8460.88 8.390.88 3,390.43 -3,305.61 5.932.805.728 715,878,313 2.39 1,283.39 10,400.00 40.48 321.35 8479.87 8409.87 3,403.10 -3,315.80 5.932,818,098 715,867,756 1.17 1,289.27 3/2/2016 3:44.37PM Page 14 COMPASS 5000.1 Build 61 BP by Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb Q 70 OOusft SiW PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15APB1 Survey Calculation Method: Minimum Curvature Design: 16.15APB1 Database: EDM R5K - Alaska PROD - ANCPI Survey MD Inc Azi (azimuth) TVD TVDSS NIS EMI Northing Beating D1.eg V. Sec - (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (°1100usft) (usft) - 10.425.00 40.38 321.57 8.498.90 8,428.90 3.415.78 -3,325.91 5,932,830.480 715,857.291 0.70 1,295.2L - 10,450.00 40.29 321.77 8,517.96 8,447.96 3,428.47 -3,335.94 5,932,842.876 715,846.892 0.63 1,301.18 10,475.00 40.22 321.96 8.537.04 8,457.04 3,441.18 -3,345.92 5,932,655.287 715,836.552 0.57 1.307.19 10.500.00 40.29 322.03 8,556.12 8,486.12 3,453.91 -3.355.86 5,932,867.722 715,826.240 0.33 1,313,24 10,525.00 40.15 322.29 8.575.20 8,505.20 3,466.66 -3,365.77 5,932,880.177 715,815.971 0.87 1,319.33 10.550.00 40.29 322.47 8,594.29 8,524.29 3,479.45 -3.375.62 5,932,892.671 715.805.750 0.73 1,325.48 10,575.00 40.45 322.65 8.613.34 8,543.34 3.492.30 -3.385.47 5,932,905.236 715,795.537 0.79 1.331.69 10.600.00 40,48 322.86 8,632.36 8,562.36 3,505.22 -3,395.29 5.932,917.861 715.785.347 0.56 1,337.97 10,625.00 40.36 323.06 8.651.39 8.581.39 3.518.16 -3,405.05 5,932,930.510 715,775.212 0.71 1344.29 10,650.00 40.21 323.19 8,670.46 8,600.46 3,531.09 -3.414.75 5,932,943.153 715,765.141 0.69 1,350.64 10.675.00 40.42 323.31 8,689.53 8.619.53 3,544.05 -3,424.43 5,932,955,826 715,755.091 0.90 1,357.02 10,700.00 40.38 323.45 8,708.57 8.638.57 3,557.05 -3.434.09 5.932,968.544 715,745.053 0.40 1,363.45 10,725.00 40.35 323.78 8.727.61 8,657.61 3,570,09 -3,443.70 5,932,981.294 715,735.074 0.86 1,369.94 '.. 10,750.00 40.38 324.12 8,746.86 8,676.66 3.583.18 -3,453.23 5.932,994.102 715,725.170 0.89 1376.51 - 10,775.00 40.36 324.26 8.765.71 8;695.71 3,596.31 -3462.70 5,933,006.953 715,715.319 0.37 1,383.15 - 10,800.00 39.94 324.33 8,784.82 8.714.82 3,609.40 -3,472.11 5,933,019.763 715,705,535 1.69 1,389.71 - TIP 10,820.00 39.56 324.20 8,800.19 8.730.19 3,619.78 -3.479.58 5,933,029.923 715,697.768 1.92 1,395.03 KOP 10,840.01 40.83 326.00 8,815.48 8,745,48 3,630.37 -3,486.95 5.933,040.296 715.690.078 8,58 1,400.51 Interpolated Azimuth 10.870.11 44.12 338.00 8,837.71 8,767.71 3,648.28 -3,496.41 5,933,057.920 715,680.117 29.01 1,411.30 Interpolated Azimuth 10.900.70 52.00 349.00 8,858.18 8,788.18 3,670.06 -3.502.72 5.933,079.502 715.673.179 37.07 1,427.00 Interpolated Azimuth 10.932.01 56.23 2.20 8,876.58 8.806.58 3,695.25 -3,504.58 5,933.104,634 715,670.587 36.69 1,447.89 Interpolated Azimuth 10.960.19 59.08 14.12 8.891.69 8,821.69 3.718.75 -3,501.17 5,933.128.214 715,673.311 37.11 1,469.94 322016 3: 44 37P Page 15 COMPASS 5000.1 Budd 61 BP rens by Final Survey Report BAKER HUGHES Company: North America - ALASKA- BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft Site: PS DS 16 MO Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15AP81 Survey Calculation Method: Minimum Curvature Design: 16-15APBI Database: EOM RSK - Alaska PROD - ANCP1 Survey MD Inc Azi (azimuth) TVD TVDSS NIS E/W Northing Basting DLeg V. Sec (craft) (1 (% (usft) (craft) (usft) (usft) (usft) (usft) (°I100usft) (usft) 10,990.48 62.60 23.14 8,906.47 8.836.47 3,743.76 -3,492.70 5,933,153.459 715,681.051 28.47 1,495.84 11.020.27 70.21 27.87 8,918.39 8,848.39 3,768.36 -3,480.93 5,933,178.387 715,692.102 29.39 1,523.0 11,048.66 79.63 32.98 8,925.78 8.855.78 3.791.94 -3,467.05 5,933,202.368 715.705.295 37.45 1,550.40 11,080.23 83.85 4199 8,930.32 8,860.32 3,816.69 -3,448.05 5.933,227.659 715.723.566 31.24 1,581.33 11,110.23 84,99 52.51 8.933.25 8863.25 3,836.93 -3,426.15 5,933,248.522 715.744.864 35.11 1609.80 11,140,07 87.14 61.87 8.935.30 8.865.30 3,853.04 -3.401.16 5,933,265.349 715,769,377 32.11 1,636.25 11.170.25 88.43 72.39 8,936.47 8,866.47 3.864.74 -3.373.41 5.933,277.852 715,796.772 35.09 1,660,26 11,200.28 92.76 82.08 8.936.15 8.866.15 3.871.37 -3.344,17 5,933,285.324 715,825.810 35.33 1.680.62 11.230.42 93.75 93.05 8,934.44 8,864.44 3,872.65 -3,314.15 5,933,287.473 715,855.776 36.49 1,696.74 11.260.19 94.88 103.91 8.932.19 8.862.19 3,868.28 -3,284.83 5.933,283.958 715,885.206 36.57 1,707.61 11,280.40 96.58 110.64 8,930.17 8.860.17 3,862.31 -3,265.64 5.933,278.552 715.904.561 34.18 1,712.04 11,300.40 97.32 113.45 8.927.75 8,857.75 3,854,86 -3,247.24 5,933,271,639 715.923.168 14.43 1.714.79 11,330.20 99.69 110.07 8,923.34 8.853.34 3,843.94 -3,219.88 5,933,261.513 715,950.838 13.75 1,719.01 11,360.50 101.43 106.29 8,917.79 8.847.79 3.834.64 -3.191.59 5,933,253.044 715.979.387 13.54 1,725.10 11,390.31 102.97 102.83 8,911.49 8.841.49 3.827.32 -3.163.39 5,933,246.541 716,007.781 12.47 1,732.86 11.410.28 103.63 100.13 8,906.89 8.636.89 3,823.45 -3,144.35 5,933,243,227 716.026.928 13.57 1,739.03. 11.430.28 103.79 97.44 8,902.15 8,832.15 3,820.48 -3.125.15 5,933.240.819 716,046.206 13.09 1,746,0) 11460.51 102.69 93.34 8895.22 8,825.22 3,817.72 -3,095.86 5.933,238.910 716,075.561 13.69 1758.31 11,490.68 100.90 87.69 8,889.05 8.819.05 3,817.46 -3,066.34 5,933,239.506 716,105.073 19.27 1,772.65 11,520.63 100.40 83.90 8,883.52 8.813.52 3.819.62 -3,036.99 5,933,242.516 716.134.345 12.55 1,789.39. 11,550.56 100.71 79.09 8878.03 8.808.03 3,823.97 -3.007.90 5,933,247.708 716,163.296 15.83 1.807.70 11.580.43 100.22 74.81 8,872.60 8.802.60 3.830.60 -2,979.29 5.933,255,168 716,191.698 14.19 1,827.75' 11,610,32 101.50 69.60 8,866.97 8,796.97 3,839.56 -2,951.35 5.933,264.940 716,219.364 17,65 1,849.48 11.640.51 98.81 65.97 8,861.64 8,791.64 3,850.80 -2,923.85 5.933.276.969 716,246.528 14.81 1,872.96 14670.34 93.90 63.26 8,858.34 8,788.34 3,863.51 -2,897.08 5,933,290448 716,272.918 18.77 1897.36 11,700.53 91.41 58.14 8856.94 8,786.94 3,878.26 -2,870.79 5,933,305.958 716198.765 18.84 1.923.28 - 11.730.32 90.06 52.41 8,856.56 8.786.56 3.895.22 -2.846.32 5,933,323.622 716,322.733 1976 1,950.20 aV2016 3:44 37P Page 16 COMPASS 5000 1 Build 61 BP OGa2 b P Final Survey Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference. Well 16-15 Project: Prudhoe Bay TVD Reference: orkb @ 70.00usft Site: PS DS 16 MD Reference: orkb @ 70.00usft Well: 1615 North Reference: True Wellbore: 16-15AP61 Survey Calculation Method: Minimum Curvature Desigm 16-15APB1 Database: EDM RSK- Alaska PROD -ANCP1 Survey MD Inc AzI (azimuth) TVD TVDSS NIS ENV Northing Easting DLeg V. Sec (usft) (°) 0 (craft) (us8) (waft) (usft) (usft) (usft) (9f00usft) (Usft) ft1,978.5s 11,760.42 90.49 46.88 8,856.42 8,786.42 3.914.70 -2,823.39 5,933.343.761 716,345.085 18.43 11,780.60 91.81 42.55 8,856.01 8,786.01 3.92904 -2,609.20 5,933,358.500 716,358.854 22.43 1.998.05 11,800.47 93.32 38.55 8,855.12 8,785.12 3,944.12 -2,796.30 5,933,373,947 716,371.312 21.50 2,017.56 11,830.60 94.49 33.43 8,853.07 8,783.07 3,968.43 -2.778.64 5.933,398,761 716,388.257 17.39 2,047.44 11,860.88 90.65 29.14 8,851.71 8,781.71 3,994.27 -2,762.94 5,933,425,046 716,403.200 19.00 2,077.67 11,890.84 90.31 23.57 8,851.46 8,781.46 4,021.10 -2.749.64 5,933,452.254 716,415.709 18.63 2,107.56 11,920.74 89.69 17.70 8,851.46 8,781.46 4,049.07 -2.739.11 5,933,480.516 716,425.424 19.74 2,137.05 11,950.52 89.69 9.79 8,851.62 8,781.62 4,077.98 -2.732.04 5,933,509.612 716,431.651 26.56 2.165.61 11,980.76 93.50 3.95 8,850.78 8,780.78 4,107.97 -2,728.43 5,933,539.695 716,434.394 23.05 2,193.39 12.010.92 92.09 356.76 8,849.30 8,779.30 4,138.07 -2,728.24 5,933,569.789 716,433,705 24.27 2.219.56 12,040.82 93.53 352.24 8.847.84 8,777,84 4,167.79 -2,731.10 5,933,599.411 716,429,983 15.85 2,243,86 12,071.04 91.69 346.83 8,846.46 8,776.46 4,197.47 -2,736.58 5.933428.912 716,423.642 18.89 2,266.82 12.100.81 88.37 339.83 8.846.45 8,776.45 4,225.96 -2,745.12 5,933,657.148 716,414.285 26.02 2,287.23 12,130.46 89.20 333.92 8,847.07 8,777.07 4,253.21 -2,756.75 5.933,684.046 716,401.862 20.12 2,305.01 12,160.66 88.53 327.72 8.847.67 8,777.67 4,279.56 -2.771.47 5,933,709.956 716,386.390 20.65 2,320.48 -- 12.191.10 90.09 32415 8.848.04 8.778.04 4,304.77 -2.788.51 5,933,734.659 716,368.620 12.80 2,333.71 12,221.33 92.03 329.49 8,84248 8.777.48 4,330.06 -2,805.05 5,933,759.453 716,351.358 18.79 2,347.42. 12,250.72 91.75 335.78 8,846.51 8.776.51 4,356.13 -2,818.54 5,933785,123 716.337.112 21.41 2,363.25 ',. 12,281.00 89.88 341.55 8,846.08 8.776.08 4,384.32 -2,829.55 5,933,812.979 716,325.289 20.03 2,382.16 12.310.76 89.66 342.70 8,846.20 8776.20 4,412.64 -2,838.69 5,933,841.023 716,315.337 3.93 2,402.12 12,340.72 90.89 337,52 8,846.05 8,776.05 4,440.81 -2,848.88 5,933.868.877 716,304.335 17.77 2,421.41 12,370.87 90.55 332.21 8,845.68 8,775.68 4,468.09 -2.861.68 5,933,895.775 716,290.748 17.65 2,438.64 12,400.90 89.60 328.10 8,84564 8,775.64 4,494.13 -2.876.62 5,933,921.371 716,275.057 14.05 2,453.72 12,430.82 83.66 330.54 8,847.39 8,777.39 4,519.80 -2.891.85 5,933,946.569 716.259,085 21.46 2,468.34 12,460.82 78.59 333.18 8,852.02 8,782.02 4,545.93 -2,905.83 5,933,972.295 716,244,355 19.00 2,483.97 12,490.14 71.30 335.40 8,859.63 8,789.63 4,571.41 -2,918.11 5,933,997.414 716,231.339 25.91 2,499.91 12,520.45 64.41 337.70 8.871,05 8,801.05 4,597.15 -2,929.29 5,934,022,810 716,219.420 23.79 2,516.60 3/2/2016 3:44: 37PM Page 17 COMPASS 5000.1 Build 61 BP Fel it2 by Final Survei,wey Report BAKER GES Company: Project: Site: Well: Wellbore: Design: North Amenca-ALASKA-BP Prudhoe Bay P8 DS 16 15-15 1e-15APBi 16-15APB1 - Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 16-15 orkb @ 70.00usft orkb @ 70.00usft True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Vertical Survey Casing Hole Depth Depth Diameter Diameter (usft) MD (usft) 12.550.61 Inc C) 58.02 Azl (azimuth) (% 339.59 TVD (usft) 8,885.57 7VDSS (usft) 8,815.57 NIS (usft) 4.621.75 E/W (usft) -2,938.92 Northing (usft) 5934,047.118 Easting (waft) 716,209.078 DLeg (°/100usft) 21.89 V. Sec (usft) 2.533.09 -- 12.575.89 2.504.94 52.74 340.68 8.899.93 8.829.93 4,641.30 -2,945.99 5,934,066460 716,201.441 21.18 2.546.4 12,600.50 Measured 47.50 340.68 8.915.70 8.845.70 4,659.12 -2.952.24 5.934.084.086 +N/ -S 716.194,680 21.29 2,558.79 12.630.56 (usft) 41.31 335.88 8.937.17 8.867.17 4,678.66 -2.959.97 5.934.103.390 8784.82 716.186.386 23.42 2,571.85 12,660.53 35.72 329.18 8.960.62 8,890.62 4,695.22 -2,968.51 5,934.119.696 10.640.01 716,177.374 23.25 2,581.92 12,710.00 35.72 329.18 9.000.79 8,930.79 4,720.02 -2.983.30 5.934,144058 716,161.863 0.00 2.59801 Projection to TD Interpolated Azimuth 10.932.01 8,876.58 3,695.25 -3,504.58 Interpolated Azimuth 12.710.00 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 10.789.00 6,776.40 9 5/8" 9.625 12.250 2.505.00 2.504.94 13 3/8" 13 375 17,500 Design Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +E/ -W (usft) (usft) (usft) (usft) Comment 10800.00 8784.82 3,609.40 -3,472.11 TIP 10.820.00 8.800.19 3,619.78 -3,479.58 KOP 10.640.01 8.815.48 3,630.37 -3.486.96 Interpolated Azimuth 10,870.11 8,837 71 3,648.28 -3.496.41 Interpolated Azimuth 10,900.70 8,858.18 3,67006 -3.502.72 Interpolated Azimuth 10.932.01 8,876.58 3,695.25 -3,504.58 Interpolated Azimuth 12.710.00 9,000.79 4,720.02 -2,983.30 Projection to To Approved By. Yosha Ragbirsingh Survey Manager Baker Hughes 3/712016 3: 44 37PM Page 18 COMPASS 5000.1 Build 61 THE STATE Alaska Oil and Gas °fALASKA Conservation Commission GOVERNOR BILL WALKER John McMullen Engineering Team Lead BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 16-15A Permit to Drill Number: 215-187 Sundry Number: 316-169 Dear Mr. McMullen: 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.olaska.gov Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. Per 20 AAC 25.072 (d), if well operations are not resumed within 12 months, BP Exploration (Alaska), Inc. shall immediately proceed to abandon or suspend well Prudhoe Bay Unit 16-15A. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy . Foerster Chair DATED this day of March, 2016. RBDMS L L MAR 1 1 2016 STATE OF ALASKA .ASKA OIL AND GAS CONSERVATION COMMIS: APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown Iv❑ ' Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susie Well ❑ Alter Casing ❑ Other ❑ 2. Operator Name: SP Exploration (Alaska), Inc 4. Current Well Class: Exploratory ❑ Development p 5. Permit to Drill Number: 215.187 - 3. Address: P.O. Box 196612 Anchorage, AK API Number: 50-029-21474-0140 99519-6612 Stratigraphic ❑ Service ED]6. 7. If hat Regula What Regulation or Conservation Order governs well spacing in this pool? 8. Well Name and Num �er� FI Will planned perforations require a spacing exception? Yes ❑ No 0 PBU 16-15A n TAR Q/P0!0 9. Property Designation (Lease Number): 10. Field/Pools: �-r ADL 028332 PRUDHOE BAY, PRUDHOE OIL it. PRESENT WELL CONDITION SUMMARY Total Depth MD (ff): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD)'. 1 12600 8809 12600 8809 None None Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 32-112 32-112 1490 470 Surface 2473 13-3/8" 32-2505 32-2505 3450/4930 1950/2670 Intermediate 10759 9-5/8" 30-10789 30-8776 6870 4760 Production Liner 4816 7" 6006-10822 5409-8802 7240/8160 1 5410/7020 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 10822 - 12600 8802 - 8809 4-12", 12.6# 13Cr80 28-10648 Packers and SSSV Type: 412" TIW HBSP Pecker Packers and SSSV MD (ft) and TVD (ft): 10592/8626 No SSSV Installed No SSSV Installed 12. Attachments: Proposal Summary 0 Wellbore Schematic 0 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development 0 ' Service ❑ 14. Estimated Date for Commencing Operations: 2/28/2016 15. Well Status after proposed work: Oil ❑ WINJ ❑ WDSPL ❑ Suspended ❑ _—] 16. Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown a • Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not Contact Boltz, Travis be deviated from without prior written approval. Email Travis.Boltz@bp.com Printed Name John McMulle Title Engineering Team Lead / Signature Phone +1 907 564 4711 Date �Z 'O COMMISSION USE ONLY Conditio of proval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ / Other: sllq. kv if S ✓k� 'R e'y o/ alWe 11 6rC✓q -'"0✓)5 C.,d gf7' res t. w -r Co e Vc t-lek5 W"t Z0�463 n. n>^r.✓ p7-� aGR9L Z5.op2 (b) If'o p-ri-6t nJnot rsS� arc! 1n l2 moi P1-0Crr-d¢o a4--+ it ti Post Initial Injection MIT Req'd? Yes ❑ No ❑ 2 0 A+G Spacing Exception Required? Yes ❑ No 13/ Subsequent Form Required: / d -- -It, 4 APPROVED BYTHE Approved by: COMMISSIONER COMMISSION Date:3 !7' - / vTL 3/91//0 ORIGINAL RBDMS LI- MAR 1 1 1016 Submit Form and Farm 10-403 Revised 1112015 Approved application is valid for 12 months from the date of approval. oor 711 Attachments in Duplicate 'l�6 � 3 516 Lastufka, Joseph N From: Boltz, Travis Sent: Tuesday, March 01, 2016 4:48 PM To: Lastufka, Joseph N Subject: 16-15A Suspended Sundry external -email: Joe, Nordic 2 had to suspend operations on 16-15A due the cost of open hole sidetracking 16-15A for a 2"d time were not justified by the accessible reserves. 16-15APB1 decision was due to structure coming in significantly higher; thus, requiring us to sidetrack to access missed reserves to make the well economic. We set a cement retainer at 11,750'MD to heal losses at a fault at 11,850' MD. We then set a billet 11,650'MD and open hole sidetracked 16-15A. We encountered losses at the same fault at —11,850'MD. After drilling to—12,600'MD, we did a long wiper trip to the window and when we ran back down were unable to make it past a collapsed shale interval at 11,040'MD. As a result, we would have to open hole sidetrack a second time (with losses) to complete the well. The cost to sidetack again was not justified by accessible reserves. After deciding to suspend the well, we bullheaded 8.4ppg 1%KCL,freeze protected and rigged down and moved to 03-21A. The plan forward is to find reserves that justify the cost of a future sidetrack from 16-15A. Respectfully, Travis Boltz Coiled Tubing Drilling Engineer Cell: 502-640-1645 Office: 907-564-5750 TREE= NtWOY GEV4 WELLHEAD= MCEVOY ACTUATOR= BAKE2C OKB. ELEV = 70' BF. E.EV = SOZ KOP= 3262' Max Angle = 50- @ 6700' Datum MD= 1093T Datum TVD= 8mv SS 1 13-3/8" CSG, 72#, L -80/K-55, D =12.347- 1 x7- 1 7- LNR-TACK, 26#, L-80, .0383 bpf, D = 6276" Minimum ID = 3.725" @ 11040' 4-1/2" HES XN NIPPLE L-80 Note' PERFORATION SUMMARY REF LOG: SHCS ON 12/14/65 ANGLE AT TOP PERF: 38' 0 10870' Ralat to Production DS for INtortealperl data SIZE SPF INTERVAL Opo/S9z SHOT SOZ 3-3/8• a 10878-+089+ S 07/09/e9 KBG2-LS 3 -ale- 4 10679-+0802 O Den 2188 3701 3-3m' 4 10697 - to9+5 0 06112/85 0 9-J/8' 4 10018 - 10939 D O6/12188 IBG-2-LS J-3/6' 4 10918 - 10033 S 07/09/86 9026 3-3 /a- 4 10936 - 10949 O 06/12/86 0 3-3/8• 4 10936 - 10849 S 07/09/86 KBG-2-LS 3-3/8• 4 10959 - 11006 O 08/12/88 10363 3-3/8- 4 10959 - 11008 3 07/09/86 0 3-3/6' 6 11045 - 11065 O 0811 3/09 3-316' 2 11080.11086 0 +011 919z 3.3/S• 1/2 11080 - 11080 306123188 9-3/8' 6 11075 - 11095 O 08/13/09 4-1/2" x 7" Baker whipstock (a7 10,822' M 7" x 4-1/2' Posi-Set Plug @ 10,857' sAFE17 NOTES: —CHROME TBG 16-15A NP, D = 3.812' GAS LFT IVANDRES ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 3309 3306 10 KBG2-LS DMY NT 0 08/20/06 2 3701 3686 17 KBG-2-LS DMY NT 0 05/29/14 3 6872 5987 50 IBG-2-LS DMY NT 0 05129/14 4 9026 7503 44 KBG-2-LS DW NT 0 03105796 5 9733 7984 48 KBG-2-LS 11W NT 0 08/13/06 6 10363 8430 41 KBG2-LS DW NT 0 03705/98 1059W I -H7 -X 70645' H4-1/2"TIB14GTALWLEG,D=4.000" E -MD TT NOT LOGGED 71025' 7-X4.5"TWDPKRD=3.9x6" IF 41/2'TBG H 71025' I y I 77039' -j41/2'FES XN NP,D=3.725" D = 3.958' 11042' 11042' 41/2" TIJBNG TAIL, D = 3.854" 11042' HELmrr LOGGE) 02/25/92 PBTD 71342' .0371 bpf, D = 6.184' 11388' DATE FEV BY COMME4T3 DATE REV BY COMMENTS 12714185 ORIGINAL COMPLETION 06/03/14 JLS/JND GLV C/O (05/29/14) 12N8191 RWO 06/05/14 JMD ISO R(RASSY DEPTH EDIT 03MSMB WES LAST WORKOVER 07/14/01 RN/TP CORRECTIONS 07/25109 PJP/'PJC PERF REF LOG UPDATE 09/28/09 W/SV ADPEiF(08/13/09) PRIDHOE BAY LINT WELL: 16-15 PIEFW No: 1852640 API No: 50-029.2147400 Sec. 24, T10K R15E, 141T FPL 8 505' FWL BP Bnploration (Alaska) Well: Prudhoe Bay Unit 16-15A PTD Number: 215-187 API Number: 50-029-21474-01-00 Sundry Number: 316-169 Additional text for AOGCC's approval letter for Sundry 316-169: Per 20 AAC 25.072 (d), if well operations are not resumed within 12 months, BP Exploration (Alaska), Inc. shall immediately proceed to abandon or suspend well Prudhoe Bay Unit 16-15A. rt7 /� PTD 2!5—!g 7- Loepp, Victoria T (DOA) From: Lastufka, Joseph N <Joseph.Lastufka@bp.com> Sent: Tuesday, March 01, 2016 4:55 PM To: Loepp, Victoria T (DOA) Cc: Boltz, Travis Subject: 16-15A (PTD #215-187) Op Shutdown Sundry Follow Up Flag: Follow up Flag Status: Flagged Victoria, This sundry will be submitted tomorrow. Please let me know if you have any questions. Thanks, Joe From: Boltz, Travis Sent: Tuesday, March 01, 2016 4:48 PM To: Lastufka, Joseph N Subject: 16-15A Suspended Sundry Joe, Nordic 2 had to suspend operations on 16-15A due the cost of open hole sidetracking 16-15A for a 2nd time were not justified by the accessible reserves. 16-15APB1 decision was due to structure coming in significantly higher; thus, requiring us to sidetrack to access missed reserves to make the well economic. We set a cement retainer at 11,750'MD to heal losses at a fault at 11,850' MD. We then set a billet 11,650'MD and open hole sidetracked 16-15A. We encountered losses at the same fault at -11,850'MD. After drilling to—12,600'MD, we did a long wiper trip to the window and when we ran back down were unable to make it past a collapsed shale interval at 11,040'MD. As a result, we would have to open hole sidetrack a second time (with losses) to complete the well. The cost to sidetack again was not justified by accessible reserves. After deciding to suspend the well, we bullheaded 8.4ppg 1%KCL,freeze protected and rigged down and moved to 03-21A. The plan forward is to find reserves that justify the cost of a future sidetrack from 16-15A. Respectfully, Travis Boltz Coiled Tubing Drilling Engineer Cell: 501-640-1645 Office: 907-564-5750 Wallace, Chris D (DOA) From: AK, D&C Well Integrity Coordinator <AKDCWellIntegrityCoordinator@bp.com> Sent: Tuesday, March 01, 2016 11:50 AM To: AK, OPS FS2 OSM; AK, OPS FS2 DS Ops Lead; AK, OPS FS2 Facility OTL; AK, OPS FS2 Field OTL; AK, OPS PCC EOC TL; AK, D&C Wireline Operations Superintendent; AK, D&C Well Services Operations Superintendent; Cismoski, Doug A; Daniel, Ryan; AK, RES GPB East Wells Opt Engr; AK, OPS EOC Specialists; AK, OPS PCC Ops Lead; AK, RES GPB West Wells Opt Engr; G GPB FS2 Drillsites; Drotar, Mark; 'ch risma I lace @alaska.gov'; Regg, James B (DOA) Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Well Integrity Coordinator; AK, D&C Projects Well Integrity Engineer; AK, OPS FF Well Ops Comp Rep; Sternicki, Oliver R; Pettus, Whitney; Sayers, Jessica; Dickerman, Eric Subject: NOT OPERABLE: Producer 16-15A (PTD #2151870) Wellwork Operational Shutdown Um Producer 16-15A (PTD #2151870) was recently undergoing wellwork with coiled tubing drilling a lateral sidetrack. Due to unplanned events, an operational shutdown was initiated prior to completion. At this time the well has been reclassified as Not Operable until further notice. Please call with any questions. Thank you, Kevin Parks BP Alaska - Well Integrity Coordinator G� A / Global Wells V Y Organization Office: 907.659.5102 WIC Email: AKDCWeIIIntegrityCoordinator@bo.com THE STATE °fALASKA GOVERNOR BILL WALKER Travis Montgomery Interventions & Integrity Engineer BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 16-15A Permit to Drill Number: 215-187 Sundry Number: 317-040 Dear Mr. Montgomery: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.olaska.gov Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Daniel T. Seamount, Jr. Commissioner r DATED this day of February, 2017. RBDMS � L/ FEB 2 12017 STATE OF ALASKA 1 ALASKA OIL AND GAS CONSERVATION COMMIS'_ .4 APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown ❑ Suspend 21 Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other ❑ 2. Operator Name: BP Exploration (Alaska), Inc 4. Current Well Class: Exploratory ❑ Development @. 5. Permit to Drill Number: 215-187 ' 3. Address: P.O. Box 196612 Anchorage, AK 99519-6612 Stratigrephic El Service ❑ 6. qpl Number: 50-029-21474-01-0D 7, If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes ❑ No 0 PBU 16-15A REnov 9. Property Designation (Lease Number): 10. Field/Pools: ADL 028332 - q PRUDHOE BAY, PRUDHOE OIL • JAN 2 4 ?017 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD(ft) : Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): 14"011F, - 12600 8809 12600 8809 None None Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20" 32-112 32-112 1490 470 Surface 2473 13-3/8" 32-2505 32-2505 3450/4930 1950/26 Intermediate 10759 9-5/8" 30-10789 30-8777 6870 4760 Production Liner 4818 7" 6006- 0825 1 5409-8804 1 7240 / 8160 5410/7020 Perforation Depth MD (f): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (8): 10825 -12600 8804 - 8809 4-1/2" 12.6# 13Cr80 28-10648 Packers and SSSV Type: 4-1/2" TI W HBBP Packer Packers and SSSV MD (8) and TVD (11): 10592/0626 No SSSV Installed No SSSV Installed 12. Attachments: Proposal Summary El Wellbore Schematic 0 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development ® - Service ❑ 14. Estimated Date for Commencing Operations: February 21, 2017 15. Well Status after proposed work: Oil ❑ WINJ ❑ WDSPL ❑ Suspended ® ' 16. Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not Contact Montgomery, Travis J be deviated from without prior written approval. Email Travis.Montgomery@bp.com Printed Name Montgomery, Travis J Title Interventions & Integrity Engineer Signature a2l�olAi Phone +1 907 564 4127 Date V?L.1 /i 7 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number, 3k-7- OH C) Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: votr/a,n c< e1ndcir'20,4A CZ.S. llz(L)�l5 ✓a yr -ff d -O ceflo uJ �o✓ ' .1 !✓I rtirs- wAat-,vic 5v5/�(r�sr yhC W 7-0 bC LPIvyyrli Post Initial Injection MIT Req'd? Yes 11 No tr/ Spacing Exception Required? Yes ❑ No 2' Subsequent Form Required: APPROVED BYTHE Z' Approved by: COMMISSIONER COMMISSION DateZ c ORIGINAL r7"L 2/ 2,1/ l --I- RBDMS �V FEB 2 7 2017 Submit Form and Form 10-403 Revised 11/2015 Approved application is valid for 12 months from the date of approval.Attach encs in Duplicate X41-7 -,-� z-6, (7 Prudhoe Bay Unit well 16-15 Technical Justification for Application for Conversion to Suspended Status January 13, 2017 Well Status An operation shutdown of PBU 16-15 (PTD 2151870) occurred on 2/29/2016 due to hole stability issues during drilling of sidetrack. The well is located within the Prudhoe Bay Unit on Drill Site 16, and is accessible by road. A passing MIT -IA to 2500 psi on 7/23/15 showed that the well is mechanically sound. The well will not allow the migration of fluids, will not damage freshwater or producing or potentially producing formations, will not impair the recovery of oil or gas, and is safe and not a threat to public health. The strata through which the well was drilled is neither abnormally geo-pressured or depleted. This well has potential as a future sidetrack candidate. Condition of the Wellhead and Surface Location PBU 16-15 is located on an active gravel pad. The area surrounding the well is clean gravel. The surrounding area is in good condition and there is no discoloration and no sheen on the pad, pits or in the nearby water. The well is equipped with a wellhead and tree, allowing for pressure monitoring. Request BPXA requests approval for suspension status of PBU 16-15 upon slickline setting a tubing tail plug at 4-1/2" HES X -NIP at 10,624' MD. The integrity of the plug will be demonstrated by a CMIT-TxIA to 2275 psi. The intent is to secure the well with a tubing tail plug to leave -5 years to either CTD sidetrack or plug the well for more permanent suspension. A variance to the provisions of 20 AAC 25.110 (c) (2) is also requested under 20 AAC 25.112 (i) to allow the well to be suspended. There are no underground sources of fresh water in this area. TTS= WEVOY GI WELLHEAD = MIxVOY I 'ACTUATOR= BAKER OKB. R = -----7V BF. E -EV = 10878 - 10891 KOP= 3262' Max Angle = 5D' Q_ 6700' Datum MD= 10937' _ Datum TVD= 88W SS OPS SHUTDOWN 16-15A 13-3/8' CSG, 72#, L-BO/K-55, D = 12.347• 2505' 9-5/8•X7'ZXPLTPw/FRCHGR.D=6.25' 6006' i 7- LNR-TACK, 26#, L-80, .0383 bpf, D = 6.276' 1057 Minimum ID = 3.725" @ 11039' 4-112" HES XN NIPPLE 4-12' TBG, 12.6#, 13CR .0152 bpf, D = 3.958' 10045' 9-5/8- CSG. 47#. L-80 BTRS. D= 8.681- 7' BKR DELTA WS (0123/16) DUMP BALED CMT (0122/16) PERFORATION SUMIAARY Fill LOG: BHCS ON 12/14/85 ANGLE AT TOP PERF: 38" @ 10870' Note: Refer to Production DB for historical perf data SIZE SPF MERVAL OpnlSgz SHOT SOZ 3-38' 4 10878 - 10891 S 07/09/86 M 3-38" 4 10879 - 10892 C 06/1288 KBG2-LS DW 3-38" 4 10897 - 10915 C 06/1288 501 3-38' 4 10918 - 10933 C 06/12/88 7503 3-38" 4 10918-10933 S 07109/86 5 9733 3-38' 4 10936- 10949 C 06/12/88 0 08113/06 3-38" 4 10936 - 10949 S 07/0986 M 3-38' 4 10959 - 11006 C 06/12/88 3-38" 4 10959 -11006 S 07/09/86 3-38" 6 11045 - 11065 C 08/13/09 3-38" 2 11060 - 11066 C 10/19/92 3-38' 12 11060 - 11080 S 0623/86 3-31W 1 6 111075-11095 C 08/13109 PBTD —) 11 1-80 BTRS, .0371 bpf, D = 6.184'--F11 , NOTES: "'CHROME TBG"' NP,0=3.812• GAS LFT MANDf71ELS ST KU TVD DEVI TYPE VLV LATCH PORT DATE 1 3309 3306 10=2 -LS DW D M 0 0&20/06 2 3701 3686 17 KBG2-LS DW M 0 052914 3 6872 5987 501 2 -LS DM1' M 0529/144 09/14 4 9026 7503 44 KBG-2-LS OW M 0 03/05/98 5 9733 7984 48 KBG-2-LS DW M 0 08113/06 6 10363 8430 41 KBG-2-LS DAY M 0 03/05/98 10590' I -j7• X 4-112' TW HBBRT PKR D = 3.912• 10624' 4-12" HES X NP, D= 3.813• 10645• 4-12•TUBNGTALWLEG D=4.000' 10666' F1MD TT NOTLOGGED MLLOUT VMDOW(16-15A) 10825'-10834' CMTREMNER t6 -15A PBI 4.25' TD 12710' OPEN HOLE 16-15A 4.25' TD OFT7J HOLE 12600' 11025' COWAMS 7• X 4.5' TWD PKR D=3.946• 11039' 4-112" FES XN NP, D = 3.725' 11042' 4-12- TUBNG TAL, D = 3.854' 11042' ELM TT LOGGED 02/25/92 DATE FiEV BY COWAMS DATE FV -V BY COMM NM 12/14185 ORIGINAL COMPLETION 12118A1 RWO 03105198 N2ES LAST WORKWEt 7228/6 NOFUC2 OPS SHUTDOWN (16-15A) 03/07/16 JKU DRLG HO COFJECTKNIS 03/07/16 TBIJAU FlMILODEAPPROVAL PRLCHOE BAY LMT WELL 16-15A PEFW No: 2151870 AA No: 50-029-21474-01 Sec. 24, T10N, R1 5E. 1417' FPL 8 505' FWL BP Exploration (Alaska) THE STATE Alaska Oil and Gas 01 ASKA Conservation Commission GOVERNOR BILL WALKER John McMullen Engineering Team Lead BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 16-15A BP Exploration (Alaska), Inc. Permit No: 215-187 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907 276.7542 WWW.aogccaloska.gov Surface Location: 1417' FNL, 504' FWL, SEC. 24, TI ON, RI 5E, UM Bottomhole Location: 3324' FSL, 2515' FEL, SEC. 14, TION, R14E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re -drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy . Foerster Chair DATED this 201 y of October, 2015. STATE OF ALASKA SKA OIL AND GAS CONSERVATION CONI OCT 2 1 2015 PERMIT TO DRILL 20 AAC 25.005 Ia. Type of Work:tb. Proposed Well Class: Development - Oil 0 - Service - Winj ❑ Single Zone . 0 1c. Specify if well is proposed for: Drill ❑ Lateral ❑ Stratigraphic Test ❑ Development - Gas ❑ Service -Supply ❑ Multiple Zone ❑ Colabed Gas ❑ Gas Hydrates ❑ Reddll 0 • Reentry ❑ Exploratory ❑ Service - WAG ❑ Service - Disp ❑ 1 Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond ' Blanket 0 Single Well ❑ 11. Well Name and Number: BP Exploration (Alaska), Inc Bond No. 6194193 PSU 16 -ISA 3 Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 196612 Anchorage, AK 99519-6612 MD: . 12771' TVD: 8933'ss PRUDHOE BAY, PRUDHOE OIL 4a. Location of Well Governmental Section): ( 7. Property Designation (Lease Number): ADL 028332 . 6, Land Use Permit: 13. Approximate spud date: Surface: 1417' FNL, 504' FWL, Sec. 24, TION, RISE, UM 2228' FSL, 2989' FEL, Sec. 14, TION, R14E, UM January 1, 2016 Top of Productive Horizon: 9. Acres in Property: 2560 14. Distance to Nearest Property: Total Depth: 3324' FSL, 2515' FEL, Sec. 14, T10N, R14E, UM 18100 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL: - 70 feet 15. Distance to Nearest Well Open to Same Pool: Surface: x- 719281 ' y- 5929513 ' Zone - ASP 4 GL Elevation above MSL: 38.7 feet 750 16. Deviated wells: Kickoff Depth: 10800 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 105 degrees Downhole: 3576 ' Surface: 2684 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade CouDlino Len th MD TVD MD TVD(including stage data 4-114" 3-1/2'x3-1/4 9.4#/6.6# 13C1,85 STL7TC11 2176' 10594' 8558'ss 12770' 8933ss 155 sx Class'G' x2-7/8" /6.5 /STL 19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (fq: Effect. Depth TVD (ft): Junk (measured): 1 11393 9267 None 11342 9224 None Casing Length Size Cement Volume MD TVD Conductor/Structural 80 20' 325 sx Arctic Set 1 32-112 32-112 Surface 2473 13-3/8" 2300sx Permafrost E, 400 sx Permafrost C 32-2505 32-2505 Intermediate 10759 9-5/8" 500 sx Class'G', 300 sx Permafrost C 30-10789 30-8777 Production Liner 5382 7" 267 sx Class'G' 6006-11388 5409-9262 Perforation Depth MD (ft): 10878 - 11095 Perforation Depth TVD (ft): 8845-9019 20. Attachments Property Plat ❑ BOP Sketch 0 Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and correct. Contact Boltz, Travis Email Travis.BoltzObp.com Printed Name J Mc en Title Engineering Team Lead Signatur Phone +1 907 564 4711 Date 2 Commission Use Only PermitaseDrill / API Number: 50- 029-21474-01-00Date: Permit Approval i See cover letter for other Number: ��'( 7 Q requirements: Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: ❑ 0 Other:mss. 13a/� ftsf /-� Samples re d: Yes No Mud log req'd: Yes ❑ No 0 35ac cq� J / � dpiw, r, / a r re- ren r«fl�f % � S fl26 rt eas hes Yes 10 No ❑ Directional svy req'd: Yes No 11Spacing eo exception req'd: Yes El No V Inclination -only svy req'd: Yes ❑ No L9� APPROVED BY Approved hy: �'/ l/� COMMISSIONER THE COMMISSION Date:„ 2f—Is— ORIGINAL "1"27115- Form L27115- Form 10-401 Revised 10/2012 This permit is valid for 24 months from the date of approval (20 AAC 25.005(9)) Submit Form and Attachments in Duplicate To: Alaska Oil & Gas Conservation Commission♦, From: Travis Boltz �, by CTD Engineer Date: October 19, 2015 Re: 16-15A Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack from well 16-15A using Nordic 2 to a target in Ivishak Zone 4. Rig Work scheduled to begin 1 January, 2016) 1. MIRU and test BOPE 250 psi low and 3,500 psi high. 2683 psi MASP). 2. Mill 3.80" window and 10' of rathole. 3. Drill Build section: 4.25" OH, —450' (351 deg/1 00 planned 4. Drill Later section: 4.5" OH, —1495' (151 deg/100 planned) - 6. Run 3-1/2" x 3-1/4" 13Cr-85 x 2-7/8" solid liner to leaving TOL 10,594 MD. 7.planned.* Pump primary cement TOC/TOL 10,594 MD, 32 bbls of 15.8 ppg cement 9. Perforate liner based on log interpretation 10. Freeze protect well to 2500' MD 11. Set TWC, RDMO 'Approved alternate plug placement per 20 AAC 25.112(1) Post -Rig Work: 1. Re -install wellhouse, flowline and pull TWC. 2. Set GLV's Mud Program: • Milling/drilling: 8.4 ppg PowerVis for milling window and drilling (326 psi over -balance). Disposal: _ — • All Class I & II non -hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4 or Pad 3 at DS 6. • Fluids >1 % hydrocarbons or flammables must go to Pad 3. • Fluids >15% solids by volume must go to GNI. • Fluids with solids that will not pass through 1/4" screen must go to GNI. • Fluids with PH >11 must go to GNI. Hole Size: ' • 4.25" From 10,800' MD to 12,775MD Liner Program: • 3-1/2", 9.4 Ib/ft, 13Cr-85, STL, solid 10,594' MD -10,800' MD • 3-1/4", 6.6 Ib/ft, 13Cr-85, TCII, solid 10,800' MD —10,925' MD • 2-7/8", 6.5 Ib/ft, 13Cr-85, TH511, solid 10,925'MD-12,770'MD • A minimum of 32 bbls of 15.8ppg of cement will be used for liner cementing. (TOC 10,594'MD) • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional: • See attached directional plan. Maximum planned hole angle is 1051, inclination at kick off point is 39° • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property -18,100'. • Distance to nearest well within pool — 750'. Logging: • MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section. Anti -Collision Failures: • 16-15 Parent Wellbore at KOP: No Errors Hazards: • DS 16 pad is considered a H2S pad. • Most recent H2S level on DS 16-15 is 450 ppm recorded on 4/14/2013 . • The lost circulation risk in 16-15A is considered to be medium, with 2 fault crossings. Reservoir Pressure: • The reservoir pressure on 16-15A expected to be 3576 psi at 8933' TVDSS. (7.7 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2683.5 psi. • An EMW of 8.4 ppg for this well will provide 326 psi over -balance to the reservoir. Travis Boltz CC: Well File CTD Engineer Joe Lastufka 564-5750 North America - ALASKA - BP Prudhoe Bay PB DS 16 16-15 16-15A Plan: 16-15A WP1 1 BP Coil Tubing Report 19 October, 2015 rias 'A as BAKER HUGHES BP iiul9 by BP Coil Tubing Report BAKER HUGHES Company: North America- ALASKA - BP Project: Prudhoe Bay Site: PB DS 16 Well: 16-15 Wellbore: 16-15A Design: 16-15A WPll Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 16-15 Mean Sea Level orkb @ 70.00usfl True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Project Prudhoe Bay, GPB, PRUDHOE BAY Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 16, TR -10-15 Site Position: Northing: 5,927,441.990 usft Latitude: 70° 12' 15.545 N From: Map Easting: 718,969.880 usft Longitude: 148° 14'4.567 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 1.66 ° Well 16-15,15-15 Well Position +N/ -S 0.00 usft Northing: 5,929,512.870 usft ° Latitude: 70° 12'35.816 N +E) -W 0.00 usft Easting: 719,280.830 usft Longitude: 148° 13' 53.802 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 38.70 usft Wellbore 16-15A Magnetics Model Name Sample Date Declination Dip Angle Field Strength (nn BGGM2015 2/1/2015 19.97 81.04 57,566 Design _-_ 16-15A WPll Audit Notes: Version: Phase: PLAN Tie On Depth: 10,700.00 Vertical Section: Depth From (TVD) +W4 +E/ -W Direction (usft) (usft) (usft) r) -38.00 0.00 0.00 30.00 1OV1912015 1:46:31PM Page 2 COMPASS 5000.1 Build 61 BP F31 Fag by BP Coil Tubing Report BAKER HUGHES Company: North Amenw- ALASKA -BP Tool Name Project: Prudhoe Bay Site: PB DS 16 Well: 16-15 GYD-CT-CMS Gyrodata cont.casing Wellbore: 16 -ISA Design: 16-15A WP11 Survey Tool Program Date 10/1912015 MWD -Standard From To (usft) (usft) Survey (Wellbore) 100.00 10,700.00 GyroData Gyro (16-15) 10,700.00 12,771.00 16-15A WPll (16-15A) V. Sec Planned Survey (usft( (usft) MD Inc Azi (usft) (usft) (usft) (°) 10,700.00 40.38 323.45 16-15 Actual Survey 715,745.057 0.00 10,725.00 40.35 323.78 16-15 Actual Survey -3,443.69 5,932,981.293 10,750.00 40.38 324.12 16-15 Actual Survey 8,676.66 3,583.18 10,775.00 40.36 324.26 16-15 Actual Survey 1,376.51 82.37 10,800.00 39.94 324.33 16-15 Actual Survey 715,715.322 0.37 10,625.00 39.47 324.17 16-15 Actual Survey -3,472.10 5,933,019.762 10,845.00 41.03 325.56 End 9deg/100ft 8,734.05 3,622.36 10,895.00 51.63 344.96 8 1,396.34 -167.79 10,900.00 52.08 347.10 11,000.00 67.60 23,64 11,047.43 77.58 3749 9 3,503.35 5,933,075.077 11,100.00 81.65 55.68 11,200.00 91.21 89.33 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 16-15 Mean Sea Level orkb @ 70.00usft True Minimum Curvature EDM R5K - Alaska PROD - ANCPI 10/19/2015 1:46:31PM Page 3 COMPASS 5000.1 Build 61 Tool Name Description GYD-CT-CMS Gyrodata cont.casing m/s MWD MWD -Standard TVDSS HIS VIA! Northing Easting DLeg V. Sec TFace (usft( (usft) (usft) (usft( (usft) (°1100usft) (usft) (°) 8,638.57 3,557.05 -3,434.09 5,932,968.543 715,745.057 0.00 1,363.45 0.00 8,657.61 3,570.09 -3,443.69 5,932,981.293 715,735.078 0.86 1,369.94 98.12 8,676.66 3,583.18 -3,453.22 5,932,994.101 715,725.174 0.89 1,376.51 82.37 8,695.71 3,596.31 -3,462.70 5,933,006.952 715,715.322 0.37 1,383.15 102.49 8,714.82 3.609.40 -3,472.10 5,933,019.762 715,705.539 1.69 1,389.78 173.89 8,734.05 3,622.36 3,481.44 5,933,032.447 715.695.836 1.92 1,396.34 -167.79 8,749.32 3,632.93 -3,488.87 5,933,042.794 715,688.098 9.00 1,401.77 30.51 8,783.96 3,665.65 3,503.35 5,933,075.077 715,672.676 35.00 1,422.87 60.00 8,787.05 3,669.46 -3,504.30 5,933,078.864 715,671.617 34.89 1,425.70 75.52 8,838.43 3,752.86 -3,494.25 5,933,162.508 715,679.234 34.69 1,502.94 74.19 8,852.67 3,791.59 -3,471.21 5,933,201.890 715,701.146 34.89 1,548.01 55.19 802.22 3,826.92 -3,433.78 5,933,238.294 715,737.525 34.88 1,597.32 78.95 8,868.62 3,856.32 -3,340.03 5,933,270.399 715,830.382 34.88 1,669.65 75.65 10/19/2015 1:46:31PM Page 3 COMPASS 5000.1 Build 61 BP EARN by BP Coil Tubing Report HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Site: PB DS 16 Well: 16-15 Wellbore: 16-15A Design: 16 -ISA WP11 Planned Survey MD (usft) 11,276.08 End 35degI100ft 11,300.00 11,400.00 11,426.00 11 11,500.00 11,600.00 11,676.00 12 11,700.00 11,776.00 13 11,800.00 11,900.00 11,926.00 14 12,000.00 12,100.00 12,200.00 12,276.00 16 12,300.00 12,396.00 16 12,400.00 12,500.00 12,600.00 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 16-15 Mean Sea Level orkb Q 70.00usft True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 Inc Azi TVDSS NIS ENV Northing 716,450.786 Easting DLeg V. Sec TFace 93.06 357.08 8,818.15 (usft) )usft) (usft) (usft) (usft) (°1100usft) (usft) V) 342.92 98.39 114.98 8,862.15 3,840.59 -3,266.57 5,933,256.813 15.00 715,904.264 34.88 1,692.76 73.48 8,795.05 99.60 111.56 8,858.41 3,831.26 -3,244.87 5,933,248.115 715,926.224 15.00 1,695.53 -70.00 8,790.51 104.25 96.98 8,837.64 3,807.11 -3,150.38 5,933,226.727 2,439.09 716,021.374 15.00 1,721.87 -70.53 4,486.55 105.32 93.10 8,831.00 3,804.90 -3,125.34 5,933,225.245 -120.60 716,046.463 15.00 1,732.47 -73.57 -2,822.56 101.29 82.47 8,813.93 3,807.74 -3,053.51 5,933,230.164 77.12 716,118.175 15.00 1,770.84 -110.001 5,933,989.820 95.29 68.57 8,799.45 3,632.50 -2,958.01 5,933,257.684 322.12 716,212.912 15.00 1,840.03 -112.451 716,196.946 90.51 58.20 8,795.60 3,666.46 -2,890.27 5,933,293.594 716,279.637 15.00 1,903.31 -114.471 89.27 54.82 8,795.65 3,879.70 -2,870.26 5,933,307.408 716,299.256 15.00 1,924.79 -110.00 85.41 44.08 8,799.18 3,928.96 -2,812.66 5,933,358.321 716,355.398 15.00 1,996.25 -109.99 85.11 40.48 8,801.16 3,946.65 -2,796.57 5,933,376.471 716,370.966 15.00 2,019.61 -95.00 84.06 25.45 8,810.66 4,029.92 -2,742.54 5,933,461.273 716,422.547 15.00 2,118.74 -94.70 83.85 21.54 8,813.40 4,053.63 -2,732.24 5,933,485.269 716,432.160 15.00 2,144.43 -93.28 87.73 11.11 8,818.85 4,124.35 -2,711.55 5,933,556.554 716,450.786 15.00 2,216.01 -70.00 93.06 357.08 8,818.15 4,223.81 -2,704.43 5,933,656.172 716,455.015 15.00 2,305.71 -69.23 98.21 342.92 8,808.29 4,321.53 -2,721.61 5,933,753.355 716,435.007 15.00 2,381.75 -69.33 101.80 331.93 8,795.05 4,390.53 -2,750.25 5,933,821.492 716,404.371 15.00 2,427.19 -70.73 99.99 328.76 8,790.51 4,411.01 -2,761.91 5,933,841.620 716,392.123 15.00 2,439.09 -120.00 92.48 316.39 8,780.06 4,486.55 -2,819.81 5,933,915.445 716,332.062 15.00 2,475.56 -120.60 91.89 316.50 8,779.90 4,489.45 -2,822.56 5,933,918.260 716,329.225 15.00 2,476.70 170.00 77.12 319.14 8,789.45 4,562.98 -2,889.23 5,933,989.820 716,260.450 15.00 2,507.04 170.00 62.38 322.12 8,823.97 4,635.22 -2,948.67 5,934,060.304 716,196.946 15.00 2,539.89 169,75 1011912015 1:46:31PM Page 4 COMPASS 5000.1 Build 61 by Company; North America- ALASKA - BP Project: Prudhoe Bay Site: PB DS 16 Well: 16-15 Wellbore: 16-15A Design: 16-15A WPII Planned Survey MD Inc (usft) (°) 12,700.00 47.73 12,771.00 37.44 TD at 12771.00 BP BP Coil Tubing Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 16-15 Mean Sea Level orkb @ 70.00usft True Minimum Curvature EDM R5K - Alaska PROD - ANCP1 ri.'d OMER HUMES AN TVDSS NIS EMI Northing Easting DLeg V. Sec TPace (°( (usft( (usft( (usft) (usft( (usft) (°I100usft) (usft( V) 326.04 8,881.11 4,701.25 -2,996.81 5,934,124.908 716,148,907 15.00 2,573.00 168.71 - 330.13 8,933.33 4,741.87 -3,022.30 5,934,164.769 - 716,122.247 - 15.00 2,595.43 166.44 10118/2015 1:46:31PM Page 5 COMPASS 50001 Build 61 BP FES Fig by BP Coil Tubing Report ER N UGM Company: North America - ALASKA -BP Local Co-ordinate Reference: Well 16-15 Project. Prudhoe Bay TVD Reference: Mean Sea Level Site: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-1 SA WP11 Database: EDM R5K - Alaska PROD - ANCP7 Targets Target Name -hiUmiss target Dip Angle Dip Dir- TVD +NI-S +El-W Northing Eluding -Shape (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 16-15A Fault 2 0.00 0.00 0.00 3,367.41 -3,915.88 5,932,765.000 715,269.000 70° 13'8.925 N 148° 15'47.514 W - plan misses target center by 8654.07usft at 10700.00usft MD (8638.57 TVD, 3557.05 N, -3434.09 E) -Polygon Point 1 O.OD 0.00 0.00 5,932,765.00 715,269.00 Point O.OD 845.49 65.58 5,933,612.00 715,310.00 16-15A Fault 5 0.00 0.00 0.00 4,327.43 -3,OD5.58 5,933,751.000 716,151.000 70° 13'18.371 N 148° 15'21.091 W - plan misses target center by 8683.43usft at 10700.00usft MD (8638.57 TVD, 3557.05 N, -3434.09 E) -Polygon Point 0.00 0.00 0.00 5,933,751.00 716,151.00 Point 0.00 596.91 -331.82 5,934,338.00 715,802.00 16-15A T.1 0.00 0.00 8,789.00 3,778.84 -2,856.44 5,933,207.000 716,316.000 70" 13' 12.976 N 148° 15'16.754 W - plan misses target center by 93.04usft at 11667.32usft MD (8795.72 TVD, 3861.96 N, -2897.70 E) - Point 16-15A T.3 0.00 0.00 8,780.00 4,461.37 -2,863.62 5,933,889.000 716,289.000 70° 13' 19.689 N 148° 15'16.970 W - plan misses target center by 49.14usft at 12406.78usft MD (8779.74 TVD, 4494.37 N, -2827.22 E) - Point 16-15A Fault 4 0.00 0.00 0.00 3,363.61 -3,784.93 5,932,765.000 715,400.000 70° 13'8.888 N 148' 15'41712 W - plan misses target center by 8647.85usft at 10700.0Ousft MD (8638.57 TVD, 3557.05 N, -3434.09 E) - Polygon Point 1 0.00 0.00 D.00 5,932,765.00 715,400.00 Point D.00 -107.82 1,197.43 5,932,692.00 716,600.00 16.15A Fault 6 0.00 0.00 D.00 5,177.D3 -2,874.84 5,934,604.000 716,257.000 70° 13'26.727 N 148" 15' 17.304 W - plan misses target center by 8806.92usft at 10700.00usft MD (8638.57 TVD, 3557.05 N, -3434.09 E) - Polygon Point 1 0.00 0.00 0.00 5,934,604.00 716,257.00 Point 0.00 -1,076.70 902.15 5,933,554.00 717,190.00 16-15A T.2 0.00 0.00 8,815.00 4,176.49 -2,734.83 5,933,608.000 716,426.000 70° 13' 16.887 N 148° 15' 13.227 W - plan misses target center by 30.36usft at 12050.52usft MD (8819.66 TVD, 4174.38 N, -2704.91 E) - Point 16-15A Fault 3 0.00 0.00 0.00 4,351.79 -2,466.62 5,933,791.000 716,689.000 70° 13' 18.612 N 148° 15'5.439 W - plan misses target center by 8728.83usft at 10700.00usft MD (8638.57 TVD, 3557.05 N, -3434.09 E) - Polygon Point 1 0.00 0.00 0.00 5,933,791.00 718,689.00 10/1912015 1:46.31PM Page 6 COMPASS 5000.1 Build 61 BP Edda by BP Coil Tubing Report BAKER HUGHES Company: North America - ALASKA - BP 4,001.49 - plan misses target center by 8716.58usft at 10700.00usft MD (8638.57 TVD, 3557.05 N, -3434.09 E) Project Prudhoe Bay Point 1 0.00 Site: PB DS 16 0.00 46.66 Point 3 Well: 16-15 Point 0.00 120.03 Wellbore: 16-15A 26.36 Point 0.00 Design: 16-15A WPtt Point 0.00 1106 -552.94 Point 0.00 -69.23 -1,370.65 Point 0.00 53.90 -2,509.61 Point 5 0.00 -69.23 -1,370.65 Point 0.00 11.06 -552.94 16-15A Polygon 0.00 0.00 0.00 3,896.57 -3,465.30 - plan misses target center by 8645.29usft at 10700.00usft MD (8638.57 TVD, 3557.05 N, -3434.09 E) - Polygon Paint 1 0.00 0.00 0.00 Point 0.00 34.17 511.23 Point 3 0.00 454.88 562.47 Point 0.00 901.26 384.35 Point 5 0.00 926.13 527.14 Point 0.00 502.57 745.94 Point 0.00 -217.96 1,097.18 Point 8 0.00 -557.37 -237.30 Point 9 0.00 7.84 -269.90 Point 10 0.00 0.00 0.00 16-15A Fault 1 0.00 0.00 0.00 4,001.49 - plan misses target center by 8716.58usft at 10700.00usft MD (8638.57 TVD, 3557.05 N, -3434.09 E) - Polygon Point 1 0.00 0.00 Point 2 0.00 46.66 Point 3 0.00 26.36 Point 0.00 120.03 Point 5 0.00 26.36 Point 0.00 46.66 16-15A T.4 0.00 0.00 8,930.00 4,645.85 - plan misses target center by 86.05usft at 12666.85usft MD (8859.87 TVD, 4680.34 N, -2982.32 E) - Point -2,358.74 0.00 -572.91 -1,492.93 -1,996.45 -1,492.93 -572.91 -2,946.30 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method; Database: 5,933,786.00 5,933,682.00 5,933,772.00 5,933,682.00 5,933,786.00 5,933,307.000 5,933,307.00 5,933,356.00 5,933,778.00 5,934,219.00 5,934,248.00 5,933,831.00 5,933,121.00 5,932,743.00 5,933,307.00 5,933,307.00 5,933,444.000 5,933,444.00 5,933,474.00 5,933,427.00 5,933,506.00 5,933,427.00 5,933,474.00 5,934,071.000 Well 16-15 Mean Sea Level orkb @ 70.00usft True Minimum Curvature EDM R5K-Alaska PROD -ANCP1 716,136.00 715,321.00 714,179.00 715,321.00 716,136.00 715,704.000 70° 13' 14.131 N 148° 15'34.437 W 715,704.00 716,214.00 716,253.00 716,062.00 716,204.00 716,435.00 716,807.00 715,483.00 715,434.00 715,704.00 716,807.000 716,807.00 716,233.00 715,314.00 714,808.00 715,314.00 716,233.00 716,201.000 70°13'15.168N 148'15'2.303W 70° 13'21.503 N 148° 15' 19.373 W 10/19/2015 1:46.31PM Page 7 COMPASS 5000.1 Build 61 BP I/a\ by BP Coil Tubing Report BAKER HUGHES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay TVD Reference: Mean Sea Level Site: PB DS 16 MD Reference: orkb @ 70.00usft Well: 16-15 North Reference: True Wellbore: 16-15A Survey Calculation Method: Minimum Curvature Design: 16-15A WP71 Database: EDM RSK- Alaska PROD -ANCPt Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) lusft) Name fin( (in) 2,505.00 2,434.94 13 3/8" 13.375 17.500 10,789.00 8,706.40 95/8" 9.625 12.250 12771.00 8,933.33 2-718" 2.875 4.500 Plan Annotations Measured Vertical Local Coordinates Depth Depth +WS +E/ -W (usft) (usft) (usft( (usft( Comment 10,700.00 8,638.57 3,557.05 -3,434.09 16-15 Actual Survey 10,725.00 8,657.61 3,570.09 -3,443.69 16-15 Actual Survey 10,750.00 8,676.66 3,583.18 -3,453.22 16-15 Actual Survey 10,775.00 8,695.71 3,596.31 -3,462.70 16-15 Actual Survey 10,800.00 8,714.82 3,609.40 -3,472.10 16-15 Actual Survey 10,825.00 8,734.05 3,622.36 -3,481.44 16-15 Actual Survey 10,845.00 8,749.32 3,632.93 -3,488.87 End 9deg/100ft 10,895.00 8,783.96 3,665.65 -3,503.35 8 11,047.43 8,852.67 3,791.59 -3,471.21 9 11,276.08 8,862.15 3,840.59 -3,266.57 End 35deg/100ft 11,426.00 8,831.00 3,804.90 -3,125.34 11 11,676.00 8,795.60 3,866.46 -2,890.27 12 11,776.00 8,799.18 3,928.96 -2,812.66 13 11,926.00 8,813.40 4,053.63 -2,732.24 14 12,276.00 8,795.05 4,390.53 -2,750.25 15 12,396.00 8,780.06 4,486.55 -2,819.81 16 12,771.00 8,933.33 4,741.87 -3,022.30 TD at 12771.00 Checked By: Approved By: Date: 10/19/2015 1: 46:31PM Page 8 COMPASS 5000.1 Build 61 Pm1M1: Pr1wAloa Bay by Sib: POM16 Wel: 1618 WebOM: 1&18.7 - PMn:1&18AWP11)1&18116.18.7) a Sht WELL DETAILS: 15-15 ANNOTATIONS 5100 &ound Lewl'. 36.70 4950 'W-5 1-W WMIn9 SeemO Lati4We LoryN4e 000 OPo 59295126)0 1t 9260630 i0°i2'Ma 16N 140°13'5S.a02W 8695.71 10775.00 16-15 ADWI SU" SE IONDEfAILS 8714.82 10800.00 16-15 ACt9alSunnq S.0 NO W Azi 6sTvD +NFO +EFW Ger TF. VSed TMget 1 10700 4038 32345 863857 3557.05 -393109 OW ODD 1363,45 2 10725.70 4035 323.78 865721 3570.09 344329 026 98.12 136984 3 107MM 40.38 324.12 867626 3583.18 345322 029 8237137651 4 107750 4036 32426 869511 3596.31 3462.70 037 102A9 1383,15 5 108000 3994 326433 871422 M090 34]2.10 1.69 17329 ISSUE 6 10825.00 39.47 324.17 87305 362226 3401.44 1.92 -167.78 139634 7 1084510 41.73 32556 874932 W3293 349927 940 30.00 1401.77 8 10895.00 5123 344.96 078386 SOMAS -350335 350 8010 142227 9 11047,43 7158 PAS 885227 379159 347121 3428 7552 154811 10 1127618 9839 114.98 8862.15 384059 328857 34AB 70.95 1692.76 11 11426.00 10532 93.10 863110 380490 312534 1510 -70.00 1732.47 12 11676011 90.51 5820 BMW U66M -289027 1510 -11010 190331 13 11778.00 05.41 MAB 0799.18 392896 -2812.88 1510 -110.00 199625 14 11926.70 8325 21.54 U13AO 4053.63 .273224 150 .95.00 2144.13 15 12276011 10190 331.93 079515 439053 -275025 1510 -70.00 2427.19 16 12396.00 92.18 31639 078ODS MOW -281991 1510 -1200 247556 17 12]7109 37M 330.13 BW333 474127 302233 1510 170011 2595.43 a Sht 52511- ANNOTATIONS 5100 TVD MD Anrdatim 4950 8638.57 10700.00 16.15 ACOW Selvey 8657.61 10725.00 16-15A80aISur y 8676.66 10750.00 16-15 ACWI Surrey 4800 8695.71 10775.00 16-15 ADWI SU" 8714.82 10800.00 16-15 ACt9alSunnq 4630- 8134.05 10825.00 16-15 AcM91 Sam 8749.32 10845.00 EI1d9d gfIOO8 .E 451x1 8783.96 10895.0 8 8852.67 11047.43 9 88821511276.08 End35degMOM X4350. SOMA 11426.00 11 � 8795.60 11676.0 12 =' 7,4200 8799.16 11776.0 13 8813.40 11926.0 14 + 8795.05 12276.00 15 s4030 8780.06 12396.00 16 a 8933.33 12771.00 TOM 12]71.0 3900 s 3750 O � 3000 34511 3300 3110 16-15AFea02 IMISA FaW14 nFIG BAM Muam 1615AFZY116 A1,15A 1615AFWO I615A Fault Fault 3. - 5.4 T)' -4200 -0050 -39U -3750 360 -34511 -3310 -3150 -3110 -2950 -2700 -2550 -2400 -2150 -210 -1'150 -191X1 d65u mu West( -)/East(+) (150 ustVin) x720 ena9&,110nrl 16 -ISA T3 8760 16-1517 3:1 ._ -- _. +' Ifi-ISA T2 + 12 13 IS 88*1 14 - 11 SM) 9 8920. EM356e9/IWfl + In ISIG lsa ivrll 8960 1615A T4 TDa112271.W 9011 `NWU wleo Mean Sea Leven 9160 Ibh,IFr - 1320 1360 1400 IM01480 1520 1560 IWO IWO 1690 1720 1760 ISSO 1840 ISM 1920 1960 2000 21,01 21190 2120 2160 22110 2240 22M1 2320 23 -- - 6u za90 2M0 2800 23z0 25r41 2600 arw 0.x0 2720 2750 2901 2840 21180 Vertical Section at 30.000 (40 usti/in) Pmjech PruEhae Bay m.w<wmm:"age WELLBORE DETAILS: 1&15A 6B[#6c611lp0M3bN �.. SiM: PBD516 wv¢rm 1615A CoaNmmlNq Pelamu'. WY1645.IIw MM Well: 16-15 sMmn sisna. venmlrvol6aseRn Abn 8alewl Wexham: 1s15A oap Tato. Pmenl Wellbore: 1F15 sxmn ry6)IkYMM'. 6h1 loA0Mo0oq 0 by Phn:16-15AWP11(16-WIS-15A wm. Tie on MD: 10]00.00 benwea0epmPe4lemz:nm®mo6un NlKl HIS CakuleBm NPotl A4nmunCuroWe 4355 4259 4225 41. 4W5 -01130 -3'' S .3 W -3935 -3]N AMS -3GA -3575 -3510 -305 -3380 -3315 -3350 -3165 -3121) -M35 QJYU -2925 -2860 8795 8730 -2665 -200 -2535 -209 -MS -23Q -2275 -2210 -2105 -2M) 8015 -1950 Wes[( -)/East(+) (65 usft/in) 31]0 4 PrOj..t: Prod hOe Bey Sire: PBC S 16 Wall: 16 Wellbor6: 1616A Plan: i6-ifiAWP11(16•JrWj 6A) 330 1 MnzoLLIMON SETTINGS COMPANY MALS: Not America - AI M -BP Inlerpolon..Me610d: MDJ.lmv l:2500 Ca Ica Wn McMod MaimumCunreWre oeplo Range From: 10]00.00 To 12771.00 Error Syarem: lSCWSA persons Loved By: Cary DI¢oonce: 147100 Scan McNod: Tree, Cylinder Nort Reference: Poon: 16 -IMM I (I6 -15I16 -15A) Error Surface: Enip&al Conic MO yenning Melbod: Rules Based 30 From Colour To MD 10700---'10950 LEGEND 10950 11100 11100 12771 60 16-t5rt6-240 � 120 210 MUD91AIIS'. 16-15 Gnu.ISM'. 50.70 F/.k2 BAKER HUGHES .W. av VV Hmam, Fmtlry lalirotle lnryrotle fin 040 0.00 N29612870 ]1nwM TP12'36S1614 148.19'63802W / SURVEY PROGRAM LEGEND Dap:2015-10-19T00:00:00 ValidalePY05 Version: SIMMIJOETAIfS Doper From Dept To SturvayMlan Tool 100.00 Sec MO no .i TVD -NI-S eD-W or., TFeu VSe. 1 10]00.00 00.30 32J.45 38]0.5] 355]US J43/.OB 0.00 0.00 1363.45 2 1072500 40.35 MIS 0557.61 357009 -3443.59 0.00 90,12 136894 310]50.00 40.]0 ]24.12 e626.fi6 ]58].10 -]45].22 0.09 8237 1376.51 4 10]]5.00 40,36 324.26 0695.71 3596.31 -.3182.70 a37 102.49 1383.15 5 10800.00 39.94INN 8714.82 3600.40 -Un.10 1.60 173.a9 1300,70 6 10825.00 39.4] 0417 2.05 36n.36 -3431.44 1.92 46]]0 130&34 7 10345.00 41.00 325.58 8]4042 3032.03 . 60.8] R00 30.00 140117 8 10095.00 51.63 344.56 0263.86 3665.65 .350195 35.00 BO.op 1022.0] 9 11047,43 7]503]49 1052.67 379159 447131 34.89 75.52 1546,01 10 112]6,08 91.39 114.988882.15 3840.59 -3288.57 3183 78.05 1692.76 11 11426.00 10532 9110 803100 3804.90 -3125.34 1540 -7OW 1].32.47 12 11676.00 90.51 W20 6]95.80 316846 -28902] 15.40 -110.00 1903,31 13 11]]8.00 85.41 44.03 87%.18 392898 401268 15,00 410.00 1086.25 14 11926.00 0345 2154 .13.40 4053.03 -VU.24 15.00 45.00 2144.43 15 12276.00 101.00 331.93 6795.05 439063 -PW.25 15.00 -70.00 2427.19 18 12396.00 92.48 316.39 0780.08 4486.55 -281981 15.00 -12000 2475.56 17 12]71.00 37.44 330.13 .3JSl 4241,02 -3022.30 1500 170.W 250543 / SURVEY PROGRAM LEGEND Dap:2015-10-19T00:00:00 ValidalePY05 Version: -03-13,03-13, 03-13 V1 Doper From Dept To SturvayMlan Tool 100.00 10700.00 GymOam Gyro (1615) GYD-CT-CMS 10700.00 12771.00 16-15AWP11(16-15A) MWD / LEGEND -03-13,03-13, 03-13 V1 -0336,0336q piao,#B 2 -03-14,03-14,03A4V1 -16-15,16-15,16-15V1 150 - 03-14, 03-14B, 03-141BV0 -16-17,16-17A, 16-17AWP03 VO • 03-36,03-36A, 03364V5 180 Azimuth from North['] vs Centre to Centre Separation [20 ustVin) North America - ALASKA - BP Prudhoe Bay PB DS 16 16-15 500292147400 16-15A 16-15A WP11 Travelling Cylinder Report 19 October, 2015 riR2 BAKER HUGHES i by Travelling BIP der Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 16 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 16-15 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 16-15A Database. Reference Design: 16-15A WP11 Offset TVD Reference: WE as BAKER HUGHES Well 1615 Mean Sea Level orkb @ 70.00usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCPi Offset Datum teference 16-15A WP11 =Iger type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference From nterpolation Method: MD Interval 25.00usft Effor Model: ISCWSA )epth Range: 10,700.00 to 12,771.O0usft Scan Method: Tray. Cylinder North tesults Limited by: Maximum cerder-center distance of 1,473.90 usft Error Surface: Elliptical Conic Survey Tool Program Date 10/19/2015 i From To su—, Pragmm Reference Offset (usft) (usft) Survey (Wellbore) Tool Name Description Offset Well Ermc 0.00 usft 100.00 10,700.00 GyroData Gyro (1615) GVD-CT-CMS Gyrodata contcasmg m/s 10,700.00 12,771.00 16-15AWPIl (16-15A) MWD MWD - Standard Distance Casing Points -- -� — ---- Offset Well - Wellbore - Design (usft) Measured Vertical (usft) Casing Hole Oeprb Depth Depth Azimuth Diameter Diameter distance (usft) (usft) Name (in) (in) load) 2,505.00 2,434.94 13 3/8" (usft) loan) 13.375 17.500 03-13-03-13-03-13 10,789.00 8,708.40 95/8" 10.00000 9.625 12.250 990.76 12,771.00 8,933.33 2-7/8" 03-14 - 03-14 - 03-14 2.875 4.500 Summary PB DS 03-03-13-03-13-03-13 olremshe Error: 0.00 call su—, Pragmm Reference Offset Centre to No -Go Allowable Offset Well Ermc 0.00 usft Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan ReMnnce M. Tenneco Offset Well - Wellbore - Design (usft) (usft) (usft) warning (usft) Oeprb PB DS 03 Azimuth MaS sE4w Hok Size Centre distance Deviation 03-06 - 03-06 - 03-06 Idea) load) (sale (uael V) (usft) loan) (in) lush) Out of range 03-13-03-13-03-13 11,700.00 10.00000 1,148.35 182.60 990.76 Pass -Major Risk 03-14 - 03-14 - 03-14 10,702.94 10,025.00 981.10 766.55 214.69 Pass - Major Risk 03-14 - 03-14A - 03-14A Out of range 03-14-03-14B-03-148 10,850.00 11,400.00 1,378.67 399.60 992.71 Pass - Major Risk 03-14 - 03-14BL1 - 03-14BL7 Out of range 03 -36 -03 -36A -03-36A 11,090.00 14,650.00 1,159.03 322.51 846.31 Pass - Major Risk 03 -36 -03 -36A -Plan M6 11,090.00 14,725.00 1,134.44 325.66 819.45 Pass - Major Risk PB DS 16 16-11 -16-11 - 16-11 Out of range 1612 - 16-12A- 16-12A Out of range 1613 - 16-13 - 1613 Out of range 1614 - 16-14 - 16-14 Out of range 1614 - 16-14A- 16-14A Out of range 1614 - 16-14B - 16148 Out of range 1615-16-15-16-15 10,725.00 10,725.00 0.00 0.96 -0.91 FAIL-NOERRORS 1617 -16 -17A -16-17A VJP03 12,214.51 11,985.00 758.71 236.13 524.67 Pass - Major Risk 1628 - 16-28 - 1628 Out of range Offset Design PB DS 03-03-13-03-13-03-13 olremshe Error: 0.00 call su—, Pragmm 100.60SSOVRO Role Assigned: Major Risk Offset Well Ermc 0.00 usft Reference Oeset semi Major Axis Measured Venical Measuretl Vemeal ReMnnce M. Tenneco Offset WallhoreCentre Casing- Centre to No Go Allnmable warning Dept, Deem Oeprb 0.,th Azimuth MaS sE4w Hok Size Centre distance Deviation loan) (usft) Idea) load) (sale (uael V) (usft) loan) (in) lush) lure) loan) CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 10/192015 1011 22A Page 2 COMPASS 5000.1 Build 61 r BP FS ill by Travelling Cylinder Report BAKER NUGNIES Company: North America - ALASKA - BP Local Co-ordinate Reference: Well 16-15 Project: Prudhoe Bay ND Reference: Mean Sea Level Reference Site: PB DS 16 MD Reference: orkb @ 70.00usft Site Error: 0.00 usft North Reference: True Reference Well: 16-15 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 1.00 sigma Reference Wellbore 16.15A Database: EDM RSK- Alaska PROD -ANCP1 Reference Design: 16-15A WP71 Offset ND Reference: Offset Datum Offset Design PB DS 03 - 03-13 - 03-13 - 03-13 onset site EROC 0.00 Usk Survey Pro9om: 100-BossoVRO Rule Assiun: Major Risk Offset WeltEvm: OOOuft Refuse. Offset Semi Major Atria Measured Vertical Measured vertical Reference Meet Toofface+ Offset Wellbore Centre Casing- Centre to NO Go Allowable Wenim, Death Delstb Depth Deut, Atlmute eNig +E/ -W H.I. Size Cemre Distance CaWMlon (usft) (uaftl (usft) loam (usft) Ivan) (1) (usft) lusft) (in) Ivan) juste lush) 1167800 8.79560 10,70000 8486 38 34.]2 29975 135.13 2,756.10 -2,157.38 7.562 1.365.09 16406 1.20987 Pus -Major Risk 11.87800 8.7%60 10]25.00 8501.58 34.72 30093 IM03 2.74030 -2.150.53 ]582 1.370.39 185.87 1,221.%Pus -Major Risk 11,67600 8,7060 10,750.00 8522.]] 34]2 302.10 136.% 272408 -2,143% 1582 1.39123 16528 1,234.47 Pass - Major Risk 11.67800 8,7%M 10,775.00 8.540.95 34]2 30328 13].]7 2.70 a4 -2,13681 7.582 1.404.42 16570 1.247.32 Pass - Major RW 11,676,00 8.78500 10800.% 8.559.13 14.72 304.46 13861 2.693.21 .2,12993 3.607 101194 16578 1,28083 Pass - Major Rik 11,67600 0.79560 10,825.% 857732 34.72 30564 139.44 2,8]7.50 -2,12305 3,687 143114 1%.16 1,27435 Pass - Major Rktk 11,67600 0]9560 10,850.00 8,5%M 34.72 30.81 14026 2,%1.84 .2,116.18 3.687 1,445.80 1%.M 1,288.14 Pass - Major Risk 11,67800 0,79560 10.87500 llsl1U 1472 301% 14106 2,646.21 -2.109.33 3807 1,400.10 11491 1,302.19 Pass - Major Risk 11685% 0,795.% 10,67500 8,48.19 34.12 290.57 132% 2,77162 -2.184.22 7.5M 1,353.57 17532 1,18599 Pass - Major Risk 11.6%.17 8]95.56 10%0.00 0450.02 34.72 29139 13165 2.]87.53 -2,171.18 2562 1,341.% 178.11 1.173.]9 Pau - Major Risk 11,8%.78 8,]%.% 10,625.0 8,43189 34.72 296.21 13082 2,80323 -2,17022 7562 1,330.13 110.08 1161,96 Pass -Maim Risk 11,%7.38 8,].4656 10,%000 841378 34.72 29503 129.78 281892 -2,105.35 7.582 1,310.89 17844 1,15) SO Pass - Major Risk 11,%7.97 8.7%M 10,57500 8.395.74 34.]2 29382 128.72 2,835.% .2,19255 7.562 1307.93 17683 1.139.34 Pass Majm Risk 11,608.57 8.795.55 10,%0.00 8.3]].81 14.]2 292.81 lVS5 2.850.49 -2,19902 7.562 129722 177,M 1,128.45 Pass - Maim Rbk 11889.17 8,795.% 10.52500 8%998 34.72 MAO 128.56 2,8%01 -2.20116 7.562 1.2%.75 17163 1,11].05 Pass - Major Risk 11,88978 0,795.% 10.WOOO 8,342.2] M.72 2%.19 12546 2,88202 -2.21457 ].562 1,2]8.55 17004 1,10]%Pass -Major Risk 1189040 8,]%.57 10.47500 8324.% 34.72 28894 12435 2,00.49 -2.222.06 TS 1881:.83 17846 1,09755 Pass - Major Risk 11]0oOD 8.7% 65 8050.00 ],90441 34.73 25552 93 ]2 331578 -2,42100 7.562 1,146.2(1 178A0 999.60 Pus - Major Risk 11700.00 8,70.65 9,875.00 ],920.95 34.73 21480 94.% 3,29885 -2,41335 714 1,145.09 in 10 9%65 Paso -Major Risk 11]00D0 8.7%.65 sWoo) 7.93745 34.73 258.23 %21 3.28191 -2,40524 7142 1,144.59 179.80 994.31 Pus - Major Risk, CC 11,700.00 87%65 9,92500 7.953.92 34.73 259.62 97.45 3,264.95 -2,397.10 1%2 1144.% 150.50 99256 Pass - Major Risk 11.700.00 0.79565 9,914 00 7,97037 14.18 26100 %% 3.247.97 -2,30097 7,552 1,145.14 101.20 99138 Pass - Major Risk 11,700.00 0,79565 9975.00 ],9116.% 34.]3 28238 %% 3.230.91 2300.05 1562 1148.% 101.% 990.70 Pass - Major Rik 1170000 8,79565 10.000.00 8,003.21 3473 26376 10117 3.21395 2.372.73 ].562 1.14835 102.% 9%.76 Pass -Majm Rik, ES. SF 11700.00 0,7%65 10,025.00 8,019.63 34,73 265.14 102.40 3.190.92 236463 1562 1.15067 10326 99135 Pass -Majm Rik 11,700.00 8,]9565 10,050.00 8.038.08 34.73 Ms2 1030 3,1]9.92 $3%55 1582 1,153A8 18391 992.46 Pass - Major Risk 11.700.00 8.7%% 10.075.00 8052.% 34.73 26790 104.85 3,162.94 -234848 7.562 1,1%.]9 184.5] 994.0]Pass -Maim Risk 11]00.00 8,70.% 10.10000 8.069.08 34]3 26920 1%OB 3,14599 -2, son" 7.50 1,1%.58 ta523 9%20 Pus- Major Risk 11,100.00 8,79565 10,12500 8.%5.84 34.]3 27064 107 3.129.0 -2,33241 1562 1161.02 1%80 9%92 Pass -Major Risk 11.70800 879565 10,11400 8,102.28 34.18 27199 1%.46 3.11223 -2,324.37 1562 11fi951 1%38 J,MAO Pass - Major Risk 11,70000 8,79565 10.17500 0,118.98 34.]3 2]3.35 109.65 3,095.46 -?316.33 7.562 1.17462 1%.% 1,005.14 Pass - Major Risk 11,]00.00 8.7%65 10200.00 0,135.]5 34.73 2]4]0 11083 3,0711.75 -2.30828 7.562 Man 16 107.53 1,008.84 Pass - Maj. Risk 11,700.00 8.7%.65 1022500 0,152.% 34]3 27603 11200 3.%2.10 -2.30.26 7.562 119613 180.11 1.01440 Pass - Maim RW 11700.00 6,7%65 10,250.00 8,189.05 3,133 2]].35 113.15 3,046.47 -2.292.20 ].552 1,192.52 18860 1,01942 Pus - Major Risk 1170000 8,70.65 10.2!500 8,114.39 34.13 27868 11430 3,020.88 -2.284.33 ].%2 111%.33 18925 1,02490 Pass - Major Risk 11,70000 8,795.65 10.300.00 8203.37 3473 200.01 11543 3,012.32 -2.27644 ].562 1.2%54 18903 1,030.82 Pus - Major Risk 11]00.00 8.79565 1032500 9.220A3 34'" 281.30 11855 2,9%.83 -226857 75fi 1,214.14 19039 1,037.17 Pus - Major Risk 11,700.00 8.7%65 1035000 8,23758 34]3 292.60 117.% 2,979.42 -2 MO ].582 1,222.% 19096 1,043.89 Pass - Major Risk 11]00.00 8.M65 10,37500 8854.83 34.73 29389 110.76 2953.11 -2,252% 7M2 1,230.35 19152 1,050.99 Pass - Major Risk 11,700.00 8.]95.% 10,40000 8,214.18 34.73 28518 11984 2.948.09 -2,24507 7562 1,230% 192.09 1,05846 Pass Majm RIM 11,700.00 8.7%% 10,425.00 8,209.60 34.73 2%A3 120.91 2,930.73 -2,23131 7.562 1.24790 192.67 10%.29 Pass -Majm RW 11.70000 8,70.65 10450% 830709 14.73 28769 121.% 2,91460 -2.229.64 7.142 125].18 19324 1074.50 Pass - Major Rik 11,70932 0,7%81 9,82600 7,88182 14.]3 254.17 91.18 3,332.% -2.429.39 T%2 1,14179 19164 %3 A2 Pass - Major Risk 11,710.47 0,795.03 9.800.00 ],8]1.18 14.]3 25281 8962 3.34958 .2.63732 ].562 115009 19220 9%01 Pau - Major Risk 11,711A4 8,79505 9]]500 7,854.50 14.73 251.49 88.48 3,3%44 -2.41522 7W 1,152.99 19294 1, 00003 Pus Major Risk 11,712.41 8.7%07 9.75D DO 7,03].]8 3473 250.16 8711 3,30326 -2,453.12 7.M2 1,1%47 193.59 1,00,44 Pus - Major Risk 11,713.39 9.7090 9,72500 7,02100 3473 24064 0510 3A%.03 -2,46103 7.M2 1.180.14 194.25 1.01014 Pass - Major Risk 11,714.30 8,7%92 9,]0000 7,804.19 34.73 24].52 M.43 3,41875 -2,468.94 1142 1,165.19 19191 1,016.46 Pass - Major Risk CC - Min centre to Center distance or covergent point, SF - min separation factor, ES - min ellipse separation 10/192015 10:11: 224M Page 3 COMPASS 5000.1 Build 61 HIRS Nuc��s Well 16-15 Mean Sea Level orkb Q 70.00usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP7 Offset Datum Offset Design r i BP Drainage Error, among 'te,et by 10x8058-GYR0 Travelling Cylinder Report Company: North America - ALASKA - BP Local Coordinate Reference: Project: Prudhoe Bay ND Reference: Reference Site: PB DS 16 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 16-15 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 16-15A Database: Reference Design: 16-15A WP11 Offset ND Reference: HIRS Nuc��s Well 16-15 Mean Sea Level orkb Q 70.00usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP7 Offset Datum Offset Design PB DS 03 - 03-13 - 0313 - 03-13 Drainage Error, among Survey Program: 10x8058-GYR0 Rule Assigned: Major Risk OIIwt Vrell E.,: am wit Reference West Semi Major Aak Measured VerHul Measured Vedini Reference Offset rush... Offset We110ore Centre Casing- Centre to No Go Allowable blaming Depth Depth Oe1Nb Ogrth Azirsu i aNl3 aU.W Nob Size Co.. Olstanu Deviation (usft) held (.sit) Juan( (usft) (.an) r) (own (usft) (in) (once lung) (usft) 11]15.30 0.79595 987500 778732 34.73 24623 03.10 3,433.42 -247686 ].562 1170.41 19561 1,022.02 Pass - Major Risk 11,725.00 0,796.24 9,27500 751055 34.74 220.54 64.91 3.89280 -2,60367 7,662 1,32461 197.19 1,198.90 Pass - Maps Risk 11,725.00 8,796.24 9,30000 7,520.23 34]4 22110 65.03 3.8>694 -2,595.09 1582 1,311 A9 197.95 1,184.20 Pass - Major Risk 11,725.00 8,796.24 9.325.00 7,54588 34.74 22a 80 6676 3.66101 -2,580.11 2582 1.29817 190.74 1,169.91 Pass - Major Risk 11,725.00 8.798.24 9,350.00 7,563,45 34.]4 230.07 87.]2 3,645.00 -2.59024 7.562 1,290.4] 199.54 1.155.92 Pass - Major Risk 11,725.00 x.796.24 9,375.00 7.501.00 34.]4 231.25 68 a9 3,629.14 -2.SM 31 2562 1,27451 200.33 1142.31 Pass - Major Risk 11,725.00 9.79824 9,400.00 7,595.50 34.74 232.44 Sam 3,613.19 4.584.30 7.562 1,28.].18 201.13 1.12908 Pass -Major Risk 11,]25.00 0,79624 9,425.00 7,615.95 34.74 233.66 7070 3,597.19 -2.556.27 TM2 1,252.22 20195 1,116.25 Pass -Major Risk 11725.00 0,79624 9,45000 7,633.34 34.74 234.88 71,73 3,581.11 -2.548.28 7.562 1,241]3 202.77 1,10365 Pass - Major Risk 11,72500 8,796.24 9,475.00 7,650.67 34.74 238.10 M.78 3,564.95 -2,54029 7562 1,231.74 20359 1,09189 Pass - Major Risk 11,]25.00 0,796.24 9,50000 7,66193 34.74 23732 7885 3.54871 -2,532.34 7.552 1222.25 204.41 1080.39 Pass - Major Risk 11,725.00 8,796.24 9,52500 ]rials 13 34.74 23858 74.94 3,532.39 -2,52441 7582 1,213.27 205.29 1,06029 Pass Major Risk 11,]25.00 8,796.24 9,550.00 7.702.29 34.74 23984 76W 3.51603 -2,51848 7.562 1.204.01 20SA7 1,050.67 Pass Major Risk 11,725.00 8756.24 9,575.00 7,71939 34.74 241.10 77.16 3.499.61 -2,508.58 7.562 1.196.8] 207.06 1,048.52 Pass - Major Risk 1172500 8.796.24 9.00000 7,736.45 3474 242.35 7029 3,403.14 -2.50083 7.562 1,189.46 20794 1,030.85 Pass - Major Risk 11,72500 8.79624 9.62500 7,75145 0074 24064 79.44 3,466.61 -2,492.70 7552 1,102.80 208M 102967 Pass - Major Risk 1172500 0,796.24 9,650.00 7,77041 34.74 244.94 00.60 3.450.00 -2.40018 7.562 1,1]6.29 20978 1,020.99 Pass - Major Risk 11.733.41 8,796.57 9,250.00 7.492.81 34.74 22539 6280 3,70.58 -2,611.51 7.582 1,330.05 20005 1.RMA0 Pass -Major Risk 11.734.54 8,790.62 9225.00 7,475.01 34.74 22424 61 as 3,72426 -2,61940 7562 1,351.95 209.71 1,=Sl Pau - Major Risk 11.73596 8796.67 9,200.00 7.457.15 34.74 22309 0.85 3.73985 -2,62734 7562 4,366.21 210.53 1,231153 Pass - Major Risk 11,]36.78 8,]98.12 9,175.00 7,439.26 3474 221.95 59.80 375539 -2,83531 7,562 1.300.81 211.38 1,254.07 Pass - Major Risk 11,737.92 8.]96.77 9,150.00 7.421.36 3634 220.82 5889 3,]]0.93 -2.00326 7.562 1.395.71 21226 1,269.a9 Paw - Make Risk 11,739.09 8]98.82 9,125.00 7.403.46 34.74 21989 5793 3.786.47 -2,651.19 7.562 1.41091 213.17 1,205.99 Pass -Maks Risk 1174029 8,79680 9.10000 7,305.54 34.74 218.55 56.59 3,002.01 4,659.10 7.562 1.42639 214.10 1,302.35 Pass - Major Risk 11,74151 0,796.94 9,075.00 7,31nel) 34.74 217.45 56.08 991753 4,666.99 7.552 1.442.17 21505 1,31902 Pass - Major Risk 11750.00 879740 9,05000 7,34960 3474 216.35 54.18 3,633.00 $67483 7.582 1,450.31 226.00 1,332.05 Pass - Major Risk CC - Min centre to center distance or covergent Point, SF - min separation factor, ES - min ellipse separation 101192015 10:11:22AM Page 4 COMPASS 5000.1 Build 61 WEb2 BAKER Well 16-15 Mean Sea Level ofkb @ 70.00usff True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 03- 03-14-03.14-03-14 BP r es by ki,a2 Travelling Cylinder Report Company: North America -ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 16 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 16-15 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 16-15A Database: Reference Design: 16-15A WPII Offset TVD Reference: WEb2 BAKER Well 16-15 Mean Sea Level ofkb @ 70.00usff True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 03- 03-14-03.14-03-14 Deaets"E er: Dae no a.., Pm'.: 100 -BOSS -GYRO Rule Assigned: Major Risk Olhe[Wall Error. ON no Reference oHaat Semi Major Area Measured Vertical Measured Vertical Reference Otlaet Toonace. Ofinsimlibaecentre Casing- Centre to No Go Allowable Marlin Noun Depth Depth De'tb Aiimur .1414 .EI -M How more Centre b stance Devietion (nail (ush) (usm (a.n) lase) (user (1) (9s") (use) (Inl (ush) (safe (asr) 10,]02.90 8,Wall 10,025.00 8404.53 34.21 226.36 -104.69 32CM -0332.5] 10.937 981.10 76855 21469 Pass- Major Risk. CC. FS. SF 10,M9 16 8,645.54 10,050.00 8.42329 3422 227,30 -106.04 3,223.80 -4,33585 10937 905.13 76945 21567 Pass - Major Risk 10,15.42 8,6W.31 10,07500 8,442.07 34.24 22840 -10739 3,20]65 433921 10937 909.78 ]]2.35 217,71 Pass - Major RW 10.]21]3 8,855.12 10,100.00 8,460.88 3426 22943 -108.72 3,191.53 -4.34263 10937 995.03 x527 MO" Pass -Major Risk 10,28.10 8.659.98 10,125.00 8,479.]0 3627 23044 -11003 3,175.46 -4,346.15 10937 1807.90 778.12 224.99 Pa. - Major Risk 10,3054 8.884.88 10.150.00 8.49954 3627 23165 -11132 3,159.43 4.34970 10.937 1,007.39 ]8.95 230.25 Pa. - Major Risk 10,741.02 8.669.82 10.17500 8,517.40 3027 23246 -11259 3.143.45 -4.35352 10.937 1,01448 ]83.]8 236.52 Pa. - Major Risk 10,74254 5,67479 10,2800 8536.26 3427 23307 -11384 3,127.51 4,35730 10.937 1.022.17 78062 243.76 Pon. - Major Rask 10.75643 8.690.03 10,225.00 8.555.16 3627 234.06 -115.07 3.11182 4,36131 10.937 1.030.01 78933 252.05 Pass - Major Risk 10,76157 8,68548 10,25000 8,574.11 35.27 23548 -116.29 3.095.00 48528 10.937 1,039.12 79201 25122 Pons - Major Risk 10,760.79 8,8098 10,275.00 5.593.8 3427 M6,45 -117.49 3.080 04 4.36929 10937 1,04830 ]94.]0 27119 Pons -Major Risk 10..46.07 8,608.44 10,30000 5.612.12 34.27 237,45 -118.65 3,064.34 4.313.34 10.937 1,057.90 79742 28192 Pons - Major Risk 10,753.44 8.]M.15 10.325.8 8,631.17 34.2] 238.43 -11981 860868 4.3].48 10937 1.0808 08.18 293.52 Pon. - Major Risk 10,790.95 8.7389 1D3W.W 96W 21 34.28 239.42 -12093 3,033.8 4.38117 10937 1.078.77 86295 305.94 Pass - Major Risk 10,7988 0,]13.]4 10,375.8 8.669.23 30.28 240.40 -122.03 3.01746 4,38.21 10.937 1.05998 80574 319.10 Pass - Major Risk 10,807.14 0,720.30 10.48.8 8.688.24 34.28 241.39 -123.11 3.8189 4390.81 10937 1,101.70 80942 333.24 Pass - Major Risk 10,815.97 972].09 10,025.8 8,]0].22 34.28 242,40 -124.17 2.9829 439546 1007 1,11386 a11.10 30903 Pass - Major Risk 10.824.84 8.73392 10,450.8 0,726.14 %28 24340 -12521 2.970.63 448.09 10937 1,12639 813.82 36343 Pass - Major Risk 10.825.00 8,34 .05 10,475.8 0.74501 34.28 244.41 -12621 2.954.88 4404.69 1007 1,139.32 816.40 370.29 Pass - Major Risk 10,8323 8.74037 10,500.8 0,78.8 3429 205.41 -127.8 2.93907 44ile 6 10.937 1,152.61 819.49 39401 Pass - Major Risk 10,837 05 8,4329 10.MS.W 8,782.5] 34.29 248.47 -127.96 2,923.15 4,01377 10937 1,18.28 822.44 41000 Pass - Major Risk 10,545.00 8,49.32 10,550 00 8,80121 34.29 247.53 -1281] 2.907.8 4.410.19 10937 I ]son 9258 425.56 Pass -Major Risk 10,84500 8.749.32 10,575.00 881975 3429 248.59 42970 2,090,89 4.422.52 10937 1194.8 92837 44428 Pass -Mafpr Risk 10,84500 9,749.32 10,W000 8,838.19 34.29 24964 -130.61 2,3455 4,628]5 10.937 1,20741 83109 461,49 Pass - Major Risk 10,845.07 8,749.32 10,62500 8,856 54 3429 250.76 -131.8 288.10 -0,430.99 town 1,224.52 83395 480,011 Pass - Major Risk 10.847.19 8.76) 97 1880.00 8,574.79 3429 25180 -132.12 2.841.58 4,43631 10.937 1,240.05 93897 496.11 Pass - Major Risk 10.850.0 8.7M 06 10,675.00 5.592.95 34.29 25300 132.63 2.824.99 4,43979 10.937 1,256.03 844.52 51177 Pass - Major Risk 10.85000 8.7W8 10,700.8 0,91101 31.29 254.12 -133.45 2,88.31 4.44434 10.937 1,272.39 84743 M111 Pass - Major Risk 10,050.00 8,753.08 10,144.07 8928.99 34.29 25528 -13424 2.]91.56 4.44897 10937 1,289.11 807 as 55201 Pass - Major Risk 10.850.00 s7M,06 10,5007 9916.80 34.29 25845 -13501 2,x4.73 AAM 82 10.937 1,308.4 BM.48 57287 Pons - Major Risk 10,850.00 0,53.06 10,77500 8,96469 34.29 257.62 -13576 2,757.83 4,45831 10.937 1.32353 8651 59367 Pass Major Risk 10,80.00 8,53.06 10,80.00 8,98242 34.29 25879 -136.49 2,740.84 4,444.8 7.062 1,34120 85923 6158 Pass - Major Risk 10,80.011 8,75306 10,85.00 9,0808 34.29 260.00 -137.19 2,7MYS) 4,46714 ].062 1,359.12 BM35 63680 Pass - Major Risk 10,8000 8,75306 10,05.00 801771 34.29 261.21 -137.09 2.705 89 4,4n.40 7062 1,3r 27 85.48 65.82 Pass - Major Risk 10,80.00 8.7538 10,875.00 98529 3429 262.42 -138.56 2.8953 4,47203 7.062 1.39562 8861 6862 Pass - Malar Risk 10,950.07 8,75306 10,900.00 9.052.64 3429 M30 -139.22 261132 4,40161 7,062 1,414.18 3175 ]02.82 Pass - Major Risk 101950.07 6.744.8 10,925.00 9.3034 3429 264,87 -139.86 2,665.45 4,48.10 7.062 1.432.92 87497 725.18 Pass - Major Risk 10,850.00 5.7538 10,95000 9.87.81 34.29 28.11 -14049 2,637.74 -449061 7062 1.451.84 87BA9 74772 Pass - Major Risk 10.854.62 8.78,47 10,97500 9.105.25 3130 287.35 -14057 2,62537 449502 782 16]0.85 08594 76344 Pas. - Mala Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 101192015 10.11:22AM Page 5 COMPASS 5000 1 Build 61 NO rag BAKER UUGHES Well 16.15 Mean Sea Level orkb @ 70.00usft True Minimum Curvature 1 Do sigma EDM RSK- Alaska PROD - ANCP7 Offset Datum Offset Design 1 BP bp 0 Travelling Cylinder Report Company: North America - ALASKA - BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 16 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 16-15 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 16-15A Database: Reference Design: 16-15A WPl l Offset TVD Reference: NO rag BAKER UUGHES Well 16.15 Mean Sea Level orkb @ 70.00usft True Minimum Curvature 1 Do sigma EDM RSK- Alaska PROD - ANCP7 Offset Datum Offset Design PB DS 03- 03 -14 -03 -14B -03-14B offset site ERor. 0.00 usft survey Program93-BDSSGYRO.S83elNGTREND,6116-MWDaIFReMSWD0A, 1%05-INC+TREND, 10722-MM.IFR. 10470 RUMAssi9ud:Major Riak Onset Well Ender. 0.00 usft Reference onset semi Major Akis Measured Vertical Measured Ver9ol Rehrepse oneet Topttace♦ offset Weliboro Centro Casing- Centre to No Go Allowable spendq Depth Depth Depth Depth Azimuth .WS aam hole sMe cents, Distance Deviation I -In deft) (ush) (up (usft) Juan) C) psftl (PIM lin) (usnl (ua) loan) 10705.83 8,643.00 11.075.00 8,608.93 34.22 92.$7 -13645 2.54987 4.47885 3.687 1.46105 396.53 1,096,78 Pass - Major Risk 10,71928 865325 11,10000 8.807.32 34.25 92.54 -13571 2.57197 4,40.13 3.687 1453.84 396.81 1007.71 Pap - Major Risk 10,732.78 8,883.51 11,125.00 8.80 17 3127 92.52 -135.00 2,594.80 4,500.2) 3687 1,445.72 38702 1,077.88 Pap - Major Risk 10.74629 887384 11,15000 8,809.38 3427 92.49 -134.30 2,618.13 -4,508.16 3,687 1,435.63 387.17 1,067.19 Pass - Major Risk 10,760.Bo 8886.09 11.17500 8,01048 34.27 9247 -133.63 2.64184 -4,51703 3607 1428]4 39726 1,055.81 Pus -Major Risk 10,45.09 8.69578 11,200.00 8,01064 34.27 9245 -132.93 2.66563 452460 3687 1,416.75 M734 1,OM.32 Pps - Major Risk 10,790.13 8)0728 11,225.00 0,010.00 34.28 9242 -132.21 2,68939 4,53246 3687 1407.03 39744 1,033.14 Pep -Major Risk 10.80565 8,719.15 11.250.00 8809.08 34.28 9240 -13147 2,712.87 4,54090 3,687 1,398.25 39751 1,02291 Pass - Major 0.uk 10,822.91 8732A4 11.95.00 8.808.11 34.28 82.38 -13072 2,735.83 4,55080 3607 1,39103 39753 1,01430 Pass - Major Risk 10,03100 873887 11,300.00 0.80752 34.29 92.37 -12984 2.758.23 4.56188 3887 1,385.42 39781 1,00690 Pass - Major Risk 10,838.13 8741.11 11,325.00 8,807.26 34.29 92.35 -128.94 2)80.02 4.574.13 IND 1.301 49 398.13 1,001.17 Pass - Major Risk 10,84500 8,74932 1135000 8.80724 3429 92.34 -12805 2,801.16 4.58747 3.687 1.39.17 3043 997.17 Pass - Major Risk 10,84500 8,74932 11.37500 8,807]5 3429 92.33 -19.28 2.W1,n 4.601.63 3,687 1,37825 398.54 99501 Pass - Major Risk 10,850.00 8,753.06 11400.00 8,808.66 34.28 92.32 -125.% 2.a4183 4.616.49 3887 1,379.3 399,60 98271 Pass - Major Risk ES. SF 10.650.00 8]53.06 11.42500 8.809% 34.29 92.31 425.22 2.86138 4,63205 Bear 1.307.41 399,73 99338 Pass - Major Risk 10.850.00 8)5306 11.450.00 8.81107 3429 92.31 -124.49 2,883.28 464837 Bear 1.383.57 399% 995.52 Pass - Major Risk 10.85540 8,757.05 11,47500 8,81226 34.30 9231 -123,16 2,09849 -4.68544 3,687 1.388.08 40043 997.68 Pus - Major Risk 10.880.00 876039 11.50000 8,81340 34.30 9230 -121.92 2,916.16 4,88300 3607 1,383.83 400Be 1,001.56Pass-Major Riak 10,850.00 8,76039 11,525.00 8.81/25 34.30 9230 -121.22 2,933.90 470086 3887 1,399.816 40082 1,0%]7 Pass - Major Risk 10,%000 878039 11550.00 8,81470 34b 92.30 -120el) 2,952.As 4.71742 3,687 1,405.13 40088 1,011.27 Pass - Major Rbk 10,860.00 8,760.39 11,57500 8,91485 34.30 9230 -119.78 3971.86 4,733.10 3687 1409.% 401.14 1,01497 Pass - Major Risk 10,810.00 0,76748 11,80000 8,814.77 M'20 W31 -117.89 2.99200 4,747.99 3.587 141118 4(MA6 1,01642 Pass - Major Risk 10,8700) 0,767.40 1182500 8,81163 31.30 92.31 -117.19 3.01281 4.761.82 3867 1,41597 40332 1,01682 Pass -Map, Risk 10.87000 8,76760 11.650.00 8,814.17 34.30 92.31 -116.47 3.034.30 4.77459 3.687 141794 403.48 1,020.03 Pau - Mayor Risk 10.3000 8,76740 11.67500 8,81320 34.30 92.32 -115.74 3.058.37 4,78&29 3687 141912 403.63 1,020.70 Pau -Major Risk 10.34.39 8.7M 50 11,700.00 8.811.89 34.31 92.33 -11449 3,070.89 4,7305 3.687 1.419.63 404.04 102038 Pas - Major Risk 10,88000 8,4430 11725.00 0.81089 34.31 9233 -113.10 3,101.07 -480682 3687 1,419.51 404.09 1,01961 Pus -Majar Risk 10,88000 6,77430 11.750.00 8.80030 34.31 92.34 -112.39 3,125.25 -4,815.50 3687 1,418.65 404.23 1,01843 Pass -Majar Risk 1088000 877430 11,77500 8,807.97 3431 9235 -11167 3,14903 4823.15 383 1,416.90 404.37 1.0164a Pass - Major Risk 10.88000 8,77430 11,800.00 8,806.47 3431 9236 -110.% 3,173.14 4,82958 363 1,414.57 404.51 1013& Pass -Majar Risk 10,890.00 8,780.82 11.82500 seat 75 34.32 92.38 -10904 3,19754 4,83474 3807 141128 40342 1.010.53 Pass -Mayr Rsk 10,890.00 8780.82 11,850.00 8,80336 34.32 9239 -108.36 3.29.18 4838.84 3687 140722 40154 1,00637 Pau - Major Risk 10,09000 8.780.02 11,87500 8.80336 34.32 9240 -107.72 3.248.75 4843.34 3,687 140403 40366 1,002.13 Pau - Major Risk 10,09500 8783.% 11,90000 8,803.99 34.32 9241 -106.49 3.9118 4,818.59 3,687 140203 402.75 1,00146 Paas - Major Risk 10,885.00 678396 11.925.00 8,804.90 34.32 92.43 -10509 3.20.39 (854.4 3.687 1,40138 402.89 1,000.83 Pus - Major Risk 10,90000 878705 11,950.00 8.1105 07 34.32 92.44 -104.47 3.31928 4.86201 3.687 1.40227 40126 1,002.51 Pus - Major Risk 10,90000 e787A5 11.35.00 8.80719 34.32 9246 -103.08 3,342.00 4,87020 3687 1,40155 40142 1,004.86 Pass - Major Risk 10,900.00 0,78705 12,00000 8.808.05 3432 9248 -103.29 3,36624 -4,87904 3887 1,407.95 401.60 100837 Pass - Major Risk 10.904.49 0.789.80 12,025.00 8.008.63 3432 92.50 -101.96 3,38944 -4,888.33 Bear 1,412.18 40096 1,01367 Pass - Major Risk 10,910.00 8,793.13 12.050.00 8809.45 3433 92.53 -10047 341238 -4.89825 3687 1417.53 399.59 1,020.66 Pass - Meer Risk 10,91000 8,793.13 12,07500 0,810.34 3433 92.56 -9991 3435.39 -4.907.97 3,657 142300 39979 1.026.33 Pass Major Riak 10910.00 sm313 12100.00 8,811.23 36.33 92.59 -99.34 3468.68 4,91701 36P 1,420.17 399.90 1.03171 Pau - Major Risk 10,910.00 8,70.13 12,125.00 8,812,43 34.33 9261 -98.79 3,43 .22 4,92535 3687 1433.03 400.18 1,03680 Pau - Major Risk 10,91538 8,188.32 12.15000 8.913.90 34.33 9265 -97.37 3,505.11 4,932.54 3.607 1437.05 39828 1,042.85 Pus - Major Risk 1092000 8,79945 12,9500 8,81507 34.34 9268 -96.04 3.530.39 4,936.38 3.687 1.440.11 39823 1,048.03 Pus - Major Risk 10.920.00 8.799.05 12,200.00 8.81560 u 92.71 -9548 3,554.94 4,94306 3.687 1,442.34 3%41 1,050.58 Pus - Major Risk 10920.00 8.799.05 12,22500 8,81590 34.34 9214 -9491 3,5793 -0946.67 3.687 1.44392 306.58 1052.53 Pass - Major Risk 10,920.00 8,79905 12,250.00 0,016.56 3434 92.77 -9436 3,604.55 -4,94900 3.687 1.444.65 396.74 1053.64 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 10/1912015 10:11:224M Page 6 COMPASS 5000.1 Build 61 ak%4 BP US F1 I p Travelling Cylinder Report RAKM HUGHES Company: North America -ALASKA -BP Project: Prudhoe Bay Reference Site: PB DS 16 Site Error: 0.00 usft Reference Well: 16-15 Well Error: 0.00 usft Reference Wellbore 16-15A Reference Design: 16-15A WP11 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well 16-15 Mean Sea Level orkb @ 70.00usft True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 03 - 03-14 - 03-14B - 03-14B G3set site Error, 000 use survey Pro9um: 93BOSSGYRO,55331NC.TREND, 611FMWDHFReMSWOCA. 10 WCITREND,10]22-MWDNFR, 107]]-h Rule Assigned: Major Risk Gross Well Error. 0.00 use Reference mat Semi Mayor Asia Masai Vertical Measured wi Rehrance What ToaOacee ghat VNllborecenM1e Casin9- Depth D"M 0.Mb Depth 34.36 93.00 ArlmWk aMS eEIAN Rola s4a (usft) (-am (as") (usft) loan) Iusm fl (ush) (.on) (in) 1083000 8.804.80 12,27500 8.81791 3034 92.80 -92.15 3,629.50 4,949.75 3.687 10,83000 5s04.80 12,300.00 381993 30.34 92.83 -9188 3854.40 4,949.09 3687 10,93000 9,80480 12,325.00 8,822.45 34.34 92M -91.19 3,679.19 494711 3.68] 10,93000 380480 1235000 8,825.44 34.30 92.89 -90.73 3703.81 4,94393 3.687 10,940.00 8,810.35 12,37500 9,82380 3435 92.92 -8860 3,720.16 4.0942 3687 10,940.00 8,01035 12.40000 6,832.47 3435 92.95 418 20 3,752.13 4,933.36 3687 10,940.00 8,810.35 12.42500 38]6.9] 34.35 9297 -8784 3.775.0 4.926.12 3887 10.940.00 8,810.35 12,45000 0,042.93 3435 93.00 -8753 3,79871 4,918.59 3,687 10.960.00 8,81568 12.475.00 8,850.48 34.36 93.02 -05.56 3,82131 4,911.02 3,687 10,950.00 8,81566 12.50000 0,859.51 34.36 9304 -05.40 3,00.1.30 434 3687 10 950 00 8815M 1252500 887005 3038 93.00 -05.31 3.864.57 4,80549 3.687 360] 3607 368] 3681 360] 360] 3687 360] 3687 3 687 Cents to Centre I..") 4 414 1,44261 1,aa020 1,43703 1,432.8] 140.51 1,421.39 415.39 140968 1,404.19 1399.94 1393 09 1389.24 1385.11 1,300.00 1.37517 1.37 22 1.37180 1.37176 1.3]4.05 377.41 3 887 1381.60 3887 1386.44 3687 1,3890 No Go Allowable blaming Distance Owlation (asn) (usft) 390.00 1,057.91 Pass -Majar Risk 390.93 10,954.01 8,810.16 12,550.00 0,682.06 34.36 93.00 -8445 3.084.99 4,887.53 10,960.00 8,820.70 12,575.00 889545 34.36 93.10 8359 3,904.55 4.8]9.59 10 Wall 8.82070 12,800.00 8.910.13 34.36 93.12 -83,72 3,923.24 -4,0]1.0] 10,96000 8,820.78 12,625.00 8.920.05 34.36 93.14 -83.93 3.940.33 406296 10,97000 562582 12,650.00 3943.12 34.37 015 -02.43 3.956.58 4,054.65 10,97000 $,On62 12,675.a0 5%1.38 34.3] 93.17 -8278 3 n,06 4,847.40 10,97000 6,82582 12,700.00 8.980.60 34.3] 0.18 -83.19 3.960,72 -4,841.10 10.97000 8,825.62 1272500 9,000.61 34.37 9320 -93.64 4.000.73 4,83580 10,980.00 0,030.19 12,75000 9.02164 34M 9321 -02.34 4,013.83 4,83258 10,98000 0,030.19 12]75.00 9,04348 34.30 9323 -62.92 4025.78 4.830.17 10,900.00 0,830.19 12.80000 9,0589 34.38 9324 -8353 4,03667 4828.31 10,980.00 551019 12.825.0 8,088.51 34.38 93M -04.15 4.04].19 AM8 10984.64 8,83221 12.842.00 9,10.89 30.38 93.2] -03]2 4,05435 AM," 360] 3607 368] 3681 360] 360] 3687 360] 3687 3 687 Cents to Centre I..") 4 414 1,44261 1,aa020 1,43703 1,432.8] 140.51 1,421.39 415.39 140968 1,404.19 1399.94 1393 09 1389.24 1385.11 1,300.00 1.37517 1.37 22 1.37180 1.37176 1.3]4.05 377.41 3 887 1381.60 3887 1386.44 3687 1,3890 No Go Allowable blaming Distance Owlation (asn) (usft) 390.00 1,057.91 Pass -Majar Risk 390.93 1,056.73 Pass - MNorRisk 391.00 1,054.67 Pass -MajorRisk 391.17 1,051.04 Pass -MajorRisk 30372 1,052.99 Pass - Major Risk 30378 1,607.93 Pass - Major Risk 30385 1.04209 Pass -Major Risk 383.92 1.030.33 Pana - Major Risk 377.2] 1.036.82 Paso -Major Risk 37733 1.03142 Penn - Major Risk 37740 1,02620 Pass -Major Risk 3]37] 1,024.30 Pass - Major Risk 369.52 1.023.42 Pass - Major Risk 369.59 1,019,11 Pass - Major Risk 36965 1,01384 Pass - Major Risk no% 1,017.61 Pass - Major Risk 36061 1,014.54 Pass - Major Risk 36065 1,012.78 Pass - Major Risk 30089 1012.40 Pass- Major ROk, CO Mass 102367 Pass - Major Risk 351.01 102812 Pass - Major R'ak 35103 1,0082 Pass - Major Risk 35104 103521 Pass -Majar Risk 346.29 1.04329 Pass - Major Risk CC - Min centre to Center distance or covergent point, SF - min separation factor, ES - min ellipse separation 101192015 10'11:22AM Page 7 COMPASS 5000.1 Build 61 ri.I BAKER HUGHES Well 16-15 Mean Sea Level orkb @ 70.00usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 03 -03 -36 -03 -36A -03-36A BP .010.1 ir"ei hp Travelling Cylinder Report Company: North America -ALASKA -BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 16 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 16.15 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 16-15A Database: Reference Design: 16-15A WP71 Offset TVD Reference: ri.I BAKER HUGHES Well 16-15 Mean Sea Level orkb @ 70.00usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 03 -03 -36 -03 -36A -03-36A 0ffsioNeErec. 0.00 an Suney Program: 57 -GCT -MS, 4771RIC+TREND, 509SMVA+IFR+M&=CA Rule Asienerl: Major Risk Offsetlerf Frear: 0.0 an Reference offset Semi Major Aais Measured Vertical Measured Vesical Reference most Toofface+ Offze[VMIIboreCamre Casing- Cari"to No Go Allovzabk Wamin9 Depth Depth Depth Depth AAmutk +NIS +Fbw Hole Size Centre Distanw Deviation beef fuss) Irste (us") fusff, fusel n jugal (rak, fin) (.an) (usn) luso) 11047 43 8052.67 10210.00 8,98955 3640 88.% -5192 4,66159 4636.35 4500 1,480.58 290.25 1.170]8 Pass - Major Risk 11,05000 8,853.22 14X2800 8,98940 3440 88.88 -57.16 4,661.23 4,611.35 4.500 1,440.45 292.07 115108 Pass - Major Ran 11,05000 8SM 22 14.250.00 8,98958 3440 88.89 -57.10 4,661.57 {586.37 4500 1,420.93 292.10 1137,47 Pass - Major Risk 11,050.00 8,85322 14.275.00 8909.73 3440 80.91 -57.04 4,662.46 4,56138 4.500 1,40195 292.14 1.11840 Pass -Major R'1sk 11,055.13 8.854.29 14,300.00 0,NOW 3441 68.92 55.58 4,883]6 4,536.02 4,500 1,303.34 295.76 1.096.86 Pass -Major Risk 11,060.00 885528 14,325.00 6,96992 3441 8894 5414 4,69532 4,51147 4.500 1,365.15 299.26 1,07542 Pass - Make Risk 11,060.00 6855.28 14.350.00 8,990.00 3141 86.95 -5407 4,868.89 4,486.52 4.500 1,347.11 299.30 1,05127 Pass - Major Risk 11,06000 B, 05528 14,37500 8990.12 36.61 68.97 -54.00 4,56640 448158 4.500 1,329.25 299.33 1,039. SO Pass -Major Rn 11,06000 8,85528 14,400.00 8,990.16 34.41 68.99 -53.92 4,669.02 4438,80 4.5M 1311% 299.36 1,021.50 Pass -Majw Ruk 11.064.68 8.85620 14.425.00 6990.15 3441 8900 -52.54 4.671.10 4.41184 1500 1293.92 302.80 1,000.83 Pass -Majw Risk 11,07000 8,85122 14450.00 8.990.20 36.61 0902 -50.98 4+672.18 4,38668 4.500 1,27843 306.78 97976 Pass -Major Risk 11,070.00 8,85122 11.475.00 5990.25 3441 89.01 -5091 4,67309 4.36188 4.500 1256.97 306.82 962.19 Pa.MotorRisk 11,070.00 8,857.22 14,500.00 6,990.29 3441 89.05 -5081 4,674.15 4,336.70 4.500 1,241.88 306.86 94197 Pan - Major Risk 11,070.00 8,857.22 14,525.00 6,990.37 3441 59.07 .5016 4,675.37 4,311]3 4500 1,225.18 Sol 928.14 Pass -Major Risk 1107538 8,85820 14550.00 0990.46 36.41 89.09 -49.17 4,577.38 4,286,81 4.500 1,209.28 31102 90640 Pass - Major Peak 1108000 6,859.02 14,57500 0,990.53 34.61 89.11 -47.75 4,600.97 426208 4500 1,19498 31662 OWN Pass - Major Ruk 1108000 885902 14,600.00 0,990.62 34.61 09.13 47.86 4,606.03 4.23780 4.500 11182.19 31458 07162 Pass - Major Ras 1108000 6,65902 14.625.00 0,990.81 M.41 09.14 -47.53 4.591.45 4.213.19 4.500 1,170.12 31470 865.38 Pass - Major Risk 11,090.00 8,86089 14.650.00 0,990.55 3441 09.16 -44.53 4,697.56 4.18595 45M 1159.03 322.51 816.31 Paes- Majw Ruk, CC, ES, OF i CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 10/192015 10:11:22AM Page 8 COMPASS 5000.1 Build 61 Bad BAKER HUGHES Well 16-15 Mean Sea Level orkb @ 70.001 True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 03 - 03-36 - 03-36A - Plan #6 by Travelling Cylinder Report Company: North America - ALASKA -BP Local Coordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 16 MD Reference: Site Error: 0.00 theft North Reference: Reference Well: 16-15 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 16-15A Database: Reference Design: 16-15A WP11 Offset TVD Reference: Bad BAKER HUGHES Well 16-15 Mean Sea Level orkb @ 70.001 True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP1 Offset Datum Offset Design PB DS 03 - 03-36 - 03-36A - Plan #6 Oncetaft Emert o 05 usft Survey Program: 574iCT-MB 477511W.TREND,4809-INC TREND. 5098-M=1IFRaMSWOCA Rule Assigned: Major Risk OOset Wall Error. 00 axil( Reference Onset Semi Major Axis Measured vertical Measured Vertical Rulerenca ONaat TooOawe Offset Wellbom cents Casing, cause No no Allowable Warning Depth Deph Depth Depth Azimuth Mir. eV -W Role Sue Centre Oistmok Omni (mum (sell (mato (ush) (mail juin) C) (usft) (uam (is) (ush) lush) husk) 11.0¢43 8 852 67 14,22500 5,989.24 3440 9242 -5802 465194 665090 4.500 1.466 54 208.42 1,188,01 Pass - Major Risk 11,047,43 8,85267 14,250.00 8.989.24 34.40 92.44 -57.97 0652.49 -4.62599 4500 1,44083 26946 1,16820 Pass-MOjur Risk 11,050.00 0,85122 14,2)5.00 8.989.24 34.40 9246 -57.20 4,65504 -4.80100 4500 1427.27 290.56 1,146]4 Pass -MOjm Risk 11,050.00 0,85122 14,300.00 8,989.24 34.40 92.40 -57.14 4.853.58 4.57600 4500 1407.80 290.80 1, 12].24 Pass - Major Risk 11,050.00 8853.22 14,325.00 8,98924 3440 92.50 -57.08 4.654.13 4,551.01 4.5M 1.388.66 290.64 1.10792 Pass -Major Risk 11,065.09 8,854.20 14,35000 8,98924 34.41 92.53 -5561 4.654.68 4,526.01 4.5M 1,389.55 294.82 1.035.11 Pass - Major Risk 11,050.00 8,85528 14,37500 8,989.24 3641 92.55 -54.18 465513 4.50102 4.500 1.35060 Met 1,052.60 Pass -Major Risk 11.060.00 8,85528 14.400.00 8.98924 3141 IX?S7 -54.11 4655.78 4,47603 4500 1,331.92 29896 1,043.73 Pass -Major Risk 11060.00 885528 14.42500 8.989.24 31.41 92.59 -5405 46%50 4,45103 4.500 1,31330 MAI 1025.0 Pass -Major Risk 11,500.00 0,855.20 14,450.00 8.98924 3441 9261 -53.98 4656.88 4.426.04 4500 120,05 299.05 1,00.61 Pass - Major Risk 11,060.00 0,85528 14.475.00 8,989.24 34.41 92.63 -5391 4.65743 4,40101 4.500 1,276.95 MAO 980.38 Pass - Major Risk 11,070.00 0,857.22 14.500.00 8.989.24 44.41 920 -51.05 4,65797 4,376.05 4.50 1,250.99 30763 0275 Pass - Major Risk 11,07000 0,057.22 14,525.0 8,98924 34.41 92.0 -50.98 4all 4.351.0 450 1.241.30 30768 944.93 Pass -Major RW 11,07000 0,85722 14,550.0 090924 34.41 92.70 -50.90 4660.0 4.326.10 4.50 1.22441 30773 92790 Pass - Major Risk 11.070.00 0,85722 14.57500 8.98924 3441 92,72 -5081 4,652 30 -4,30121 4.50 1,20.47 30.77 911.81 Pass - Major RW 11,50529 8,858.19 14.600.00 8.98924 3641 92.73 49.22 4665.44 4,276.40 4.50 1.193.42 31242 Sal Pass - Major Risk 11,08000 8,859.02 14.625.0 8,98924 31.41 9275 -47,78 409.45 4,25173 4.50 1,17943 31661 874.20 Pass Martinis, 11,00.00 8,859.02 14,650.0 8,98924 34.41 92.A -266 4674.31 4,22721 4.500 110.47 31665 0105 Pass MajorRisk 11,00.00 0,859.02 14,675.00 8.98924 34.41 92.79 -47.54 4,680.03 4,202.87 4.500 1154.0 31669 84905 Pass - Major Risk 11,090 00 8,86069 14.70.0 8.98924 34.41 9280 -44.54 4686.59 -4,17875 4.500 114399 32562 029.22 Pass - Major Rlak 11,09000 88111 147250 8,989.24 34.41 92.82 -4441 4.693.99 -4.154.87 4.50 1.134.44 3250 01945 Pace- Majorleak. 00. ES. SF CC - Min centre to center distance or covergent point, SF - min Separation factor, ES - min ellipse separation 150192015 10..11:224M Page 9 COMPASS 5000.1 Build 61 RARE HUGHES Well 16-15 Mean Sea Level orkb @ 70.00usft True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Offset Design PS DS 16 - 16-15 - 16-15 - 16-15 BP by Travelling Cylinder Report Company: North America - ALASKA -BP Local Co-ordinate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 16 MD Reference: Site Error: 0.00 Left North Reference: Reference Well: 16-15 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 16-15A Database: Reference Design: 16.15A WP11 Offset TVD Reference: RARE HUGHES Well 16-15 Mean Sea Level orkb @ 70.00usft True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Offset Design PS DS 16 - 16-15 - 16-15 - 16-15 oftseell"Erai 00I Sunny Program: 100-GYD-CT-CMS, 112a0BOSS-GYRO Rule Assignee: NOERRORS ORaet Well Error. 000 usft Reference Oesat Semi Major Axis Measured Vertical Measured VeN[al Refesse. mixed TooMacer Cent Millions Canlre Casing- Centre io Na Go Allowable Wanting DaPO Dents Depth Depth A6muth -All-8 SEI -W Hole lan Centre Distance Deviation (usft) Juan (data) (ruin (nm (usft) (1) )unary (nm (in) (deft) (.aft) (use) 10.70000 8635.57 10]00.00 863857 000 am 36.55 3,55]05 -3434.09 10.937 000 0.91 0.91 FAIL-NOERRORS 10725.00 8,0761 1072500 6,657 61 OAS 0.12 -36.22 3,57009 -3,41369 10937 000 096 41.91 FAIL - NOERRORS, ES, SF 10,750.00 0,67665 10,75000 8.675W 018 024 -35.90 3,583.18 -3,45322 10,907 am 108 4,91 FAIL-NOERRORS t0.n500 8,6071 10,n5.00 8,895.71 0.16 037 -3574 3,5%.31 -3,46270 108:17 000 1.13 -0.91 FAIL NOERRORS 10,80000 6,714.82 10,800.00 5,71482 0.16 0.49 -35.67 3,603.40 -3,472.10 7.062 am 0.08 -0.6a FAIL-NOERRORS 10,92500 8,734.05 10,825.% 8.734.05 0.17 061 -35.83 362236 -3.481" 3.687 000 0.67 4.50 FAIL-NOERRORS. CC 10,64997 8.753.04 10,850.00 8]5146 0.17 0.72 17334 3.635.13 41.49068 3.687 0.69 1.26 4.33 FAIL-NOERRORS 10,874.37 eA049 10,875.00 8,M In 0.18 054 -166.38 3.647,70 41,499.83 3.687 C30 3.17 1.27 Pala-NOERRORS 10,897.27 8,785.37 10.9100.00 8.792Y3 0.19 0.96 AmAl 3.660.13 41,500.91 3687 1152 4.91 675 Pau-NOERRORS 10,918.40 8,798.12 10,92500 8,81253 020 107 -150.53 3,67245 41.51793 3887 2185 6.33 1554 Pau - NOERRORS 10,93728 8,808.56 10,950.00 8.83240 021 1.19 -14346 3,88430 $52886 3687 34.17 7.57 28.%Pau -NOERRORS 10,95384 8,817,67 10,975,00 8,85236 an 130 -13768 3,898.87 -3,535.74 3.687 48A 858 40.44 Pan- NOERRORS 10,%8.19 8,82076 11.000.00 8,87241 0.22 101 -132.97 3.708.93 -3.544.53 3,687 65.14 942 55.97 Pass-NOERRORS 10,930.00 4830.19 11,025.00 0,892.57 0.23 1.52 -129.22 3.72088 -3.553.24 3,687 82.% 1004 n.14 Pass-NOERRORS 10,99000 e034.46 11,050.00 8,91282 0.23 163 -12615 3)32]2 -3,5(5185 3807 10195 10.53 91fi2 Pau-NOERRORS 11.00000 6830.43 11,07500 0,933.14 0.24 175 -123.30 3,744.67 -3,570.47 3607 12185 1099 111.05 Pass-NOERRORS 11,010.00 8.842.08 11,10000 8953.52 0.24 1.05 -12061 3,7%.18 -3,5n9.02 3687 14253 1142 13tW Pass-NOERRORS 11,015.39 8,843.91 11,12500 8,973.97 024 198 -118.95 376776 -3587.54 3687 163,112 1184 15237 Pan -NOERROR6 11,02000 8,845.39 11,160.00 8,994.49 024 203 017,55 3,779.36 .3595.86 3687 18556 1181 17393 Pass-NOERRORS 11,027.19 e84]56 11,17500 901506 025 208 -11574 379117 -3,60370 3887 207,441 12.07 19557 Pass-NOERRORS 11,03000 8.848.38 11,200.00 9,03575 0.25 2.14 -114.92 3.003.19 -3,811.00 3607 Mau 12,16 217W Pan -NOBRRORS 11,040.00 8.850.97 11$25.00 %056.48 0.25 2.14 11262 3.81525 -3.618.02 3687 251.53 1245 239M Pass -NOBRRORS 11040.00 5.850.97 11,25000 9,07,25 am 2.14 -11245 3.52730 -362503 3,687 274.35 1246 262.10 Pass-NOERRORS 11,04743 8,852.67 11,275.00 9,098.06 025 2.15 -110.71 3 a 25 -3.632.03 3,687 29724 12% 284.n Pass-NOERRORS 11,048.99 8,853.00 11,300.00 9,110.92 0.25 2.15 -110.15 3.851.13 -3,639.01 3,687 3M.30 12,139 30779 Pass - NCERRORS 11,050.% 8,853.22 11,32500 9,139.81 026 2.15 -10976 saw 97 $5d698 3687 34357 1271 33104 Pan-NOERRORS 11,0%.40 8,854.55 11,35000 9.160.69 0.28 2.16 -107.84 3.874.01 -3,652% 3887 306.93 1282 364.30 Pass-NOERRORS 11MM 8,85588 1137500 9,18157 026 2.17 -100.70 3811(1.65 3,65994 3,087 390.44 1266 377,75 Pass-NOERRORS 11,060.00 8.855.25 11,39300 9.196.61 am 2.17 -106.60 3.8%.18 -3.86496 3.687 407./5 12.55 394.76 Pass-NOERRORS CC - Min Centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 70/191201510: 11:22AM Page 10 COMPASS 5000.1 Build 61 BP by Travelling Cylinder Report Company: North America - ALASKA - BP Local CoorUlnate Reference: Project: Prudhoe Bay TVD Reference: Reference Site: PB DS 16 MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 16-15 Survey Calculation Method: Well Error: 0.00 usft Output strong are at Reference Wellbore 16-15A Database: Reference Design: 16-15A WP71 Offset TVD Reference: ri.I BAKM HUGHES Well 16-15 Mean Sea Level orkb@ 70.00usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCP7 Offset Datum Offset Design PB DS 16 - 16-17 - 16-17A - 16-17A WP03 onion site Error: )rection Survey Program: UOGYC-CT-CMS. 9900-MVat3 Rule Assigned: Major Risk pact Well Error: 0.00usn Reference Onset Semi MajorALa Measured Vertical Measured Vertical Reference Onset Toefface • Offset Wellbore Centre Oasmg - Centre to No Oo Allowa0le mining CaP@ Moth Depth Depth AvmNh a11/3 ♦Ef4 Role Size Co." Distance Devutern Juan) lusm (.an) l"rel loan) trim (°) lues) jusm lin) lusn) (usnl (usm 12,075.00 8,81920 10,95000 6,]29.94 3167 28.26 07,09 4,168.38 -1,23820 3667 1.460.76 18890 128080 Pass - Major Risk 12,075.00 8.81920 10.97500 8.729.65 34.67 2843 87M 4185.32 -1,255.57 3687 1,450.10 18926 1.26167 Pass - Major Risk 12,075.00 8,819.20 11,000.00 8,729.39 34.67 2861 8702 4203.20 -1,27404 3.60] 1432.71 team 1,243.82 Pass - Major Risk 12,07500 0,81920 11.025.00 8.729.13 3467 2879 68.99 4,221.97 -1,290.55 3607 1,01643 19005 1.22].15 Pass - Major Risk 12.088.79 8,818.70 11,050.00 8,728.80 34.88 28.97 84.96 4,241.58 -1,308.05 3657 1401.15 193.68 1,200.31 Pass - Major Risk 12,100.00 0,810.16 11,075.00 6720.64 ]468 29.16 83.31 4.26197 -1,320.50 3687 1,38].36 196.87 1,191.58 Pass - Major Rick 12.10000 8.818.16 11.100.00 8,720.61 34.88 2936 83.32 4,283.07 -1,33391 3887 1,37473 19].1] 1,178.47 Pass Major Ras 12,100.0) 8,818.16 11,12500 B,Y2819 34.60 29.55 93.32 4303.91 -1.34272 3.687 1.36205 19786 1,165.28 Paas - Major Risk 12100.00 8,818.16 11,15000 8,]27.97 34.68 29.M 83.32 4,323.99 -1,38280 3.687 1,348.58 199.20 1,15130 Pass -Major Risk 12,11352 9,81735 1117500 8.M.74 34.69 2997 8132 4,343.27 -1,378.51 3607 1,334.07 20172 1.131.33 Pass - Major Risk 12,12500 9,31656 11,20).00 fk2,52 34.69 30.10 V)N 4.361.69 4,39540 360] 1.310.93 2(14]3 1.11526 Pass - Major Risk 12,12500 8,81656 11225.00 8.72].31 3469 3040 79.59 4,37920 -1,41324 3.607 1,3MH 20528 1.08,63 Pass - Major Risk 12,12500 8,81654 11,25000 8,72709 3469 3D.82 79.60 4.395.76 -1,03197 3667 1288.07 Main 1,081,30 Pass - Major Risk 12.125.00 8,816.54 11.2]5.00 8.7211.68 34.89 30.85 7959 4,01131 -1,45151 3887 1,280.59 206.37 1,06329 Pass - Major Risk 12,136.14 0,81563 11,30000 072660 34,70 31.07 7789 /,425.81 -147190 3.687 1,250.24 20926 1,042.12 Pass - Major Risk 12,14025 0,815.27 11,325.00 8,725.40 34YD 31.30 A.26 4,43923 -1492.99 3887 1,231.27 21065 102180 Pass -MajorRuk 12,150.(10 0,914.35 14,350.00 0.728.28 34.71 31.52 ]5]4 445153 -1,514.75 3.687 1,21160 213.16 99977 Pass - Major Risk 12,150.00 8,814.35 11,375.00 6726.09 34.71 31,74 7572 4.462 67 -1.537.13 3697 1,19115 21387 97895 Pass Major Risk 12,150.00 8,014.35 11.400.00 0.725.91 3431 3198 7570 4,473.63 -1.56005 3697 1,170.45 214.14 957,59 Pass Major Risk 12,15000 8814.35 11,42500 0,]25]3 31.71 32.19 7588 4.481.37 -1.58347 3,687 1,149.02 214.59 935.73 Pass - Major Risk 12.15000 8,814.35 11.650.00 0.725.56 73.71 3239 7564 4,480.87 -1,110732 3807 112200 21500 913.40 Pass Major Risk 12.18114 8.813.19 11,475.00 8,]25.43 34.]2 3280 73srr 4,095.15 -1,63151 3687 1104.46 21269 BB820 Pass -Major Risk 12,16408 8.81287 11,500.00 8.726.19 34.72 3281 7341 4,501.01 -1.85580 3807 1,00179 210118 Bass 57 Pas. - Major Risk 12.17500 8,81160 11,52500 8,]2825 34.73 3302 71.75 4,506.a5 4168002 388] 1,059.27 22127 839.52 Pass - Major Risk 12,175.00 8,811.60 11,5%00 8,731.81 34.73 33.23 71.91 451267 -1,73{.10 3,657 1,1136.68 221.70 81844 Pass - Major Risk 12,175.00 8,81160 11,57500 8,]36.27 34.73 3344 72.15 451643 -1,727.97 3.687 1,01429 22212 793.54 Pass -Major Risk 12.175.00 881180 11800.00 6742.21 34.M 3366 7247 4,524.13 -175157 3.687 992.19 222.53 77089 Pass - Major Risk 12,175.00 9,61160 11,62500 8.74941 34.73 33.0] nas 4,529.74 -1.]7484 3.687 97045 222.95 74858 Pass - Major Risk 12,175.00 8,81160 11.650.00 8,]5].05 3413 36.09 73.30 4,53526 -1,79771 368) me 16 223.35 726.69 Pass Major Risk 12,184.94 8,810.35 11.675.00 8,767.51 U74 Mad ]2.40 4,54067 -1,820.13 3607 92623 225.00 703.18 Pass - Major Risk 12.187.82 8,809 97 11,700.00 9,7]8.36 34.75 34.51 72.65 4,545.911 4,84201 3687 90000 Me 79 68174 Pass - Major Risk 12.190.82 0,809.60 11.725.00 0,]9038 34.75 34.71 73.01 4,55110 -1,66332 3,687 880.48 22276 1161.03 Pass - Major Risk 12.000 0,000.29 11,750.00 6,90353 34.75 34.91 7240 4.55609 -1,88399 3637 88985 23001 Meal Pass - Major Risk 12200.07 8,800.29 11,77500 8,812]] 34]6 35.10 73.44 4$60.81 -1,90396 3.1187 85202 23041 82152 Pass - Major Risk 12.200.00 0.800.29 11,00000 61133.07 34.76 35.28 74.59 4,56555 -1,923.17 3687 835.211 23078 00420 Paas - Major Risk 12.200.00 8,808.29 11,02500 8,849.39 34.76 35411 75.85 4,57000 1,94158 3.11437 819.117 231.14 58815 Pass - Major Risk 12.20000 8008.29 11,850.00 8,868.63 34.76 35.113 77.21 4,57455 -1,959.10 3687 805.0 23150 57382 Pan - Mauer Risk 12,20000 8,808.29 11,87500 8.804.73 34.73 3519 78M 4.57933 -1,975.116 368) 79293 23184 56000 Pass - Major Risk 12,20000 6,808.29 11,900.00 8.901.65 34.76 35.95 8024 4.5&32 -1,991.22 3697 76200 23217 Meat Pas, - Major Risk 12,20973 8.80887 11,92500 8.923.32 34.]8 36.10 SOM Asset 52 -2,005.74 398] 77281 234.44 530.72 Pass - Major Risk 12,21177 8.807.56 11.950.00 8.943.71 3478 W24 8168 4.594.91 -2.019.17 388] 785.58 235.1] 531.33 Pass - Major Rick 12,21315 8.806.25 11.97500 8.961.74 3479 36.38 83.13 4.110046 -2.0314] 3687 78026 235.% 526.12 Pass Major Risk 12214.51 8.8011.13 11.98500 8.97333 36.]8 35.43 83.73 4,602 73 -2,038.07 3687 ]58.]1 2311.13 524.67 Pass- Major Risk, CC, ES, SF CC - Min Centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 10/192015 10.11:22AM Page 11 COMPASS 5000.1 Build 61 40" BP FIRS T{yrt hp Travelling Cylinder Report BAKER HUGHES Company: Project: Reference Site: Site Error: Reference Well: Well Error: Reference Wellbore Reference Design: North America - ALASKA - BP Prudhoe Bay PB DS 16 0.00 usft 16-15 0.00 usft 16-15A 16-15A WP11 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 16-15 Mean Sea Level odrb @ 70.00usft True Minimum Curvature 1.00 sigma EDM R5K - Alaska PROD - ANCPt Offset Datum ieference Depths are relative to orkb @ 70.00usft Coordinates are relative to: 16-15 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exam solution), Alaska Zone 04 Central Meridian is 150° 0'0.000 W Grid Convergence at Surface is: 1.66 ° L ..:Ca' UNTr 0 2000 4000 6000 8000 10000 12000 - 03-13,03-13,03-13V1 --8- 03-14,03-14,03-14V1 $ 03-14,03-148,0314BV0 Measured Depth LEGEND $ 03-36,03-36A,03-36AV5 -W 03-36,03-36A,PIsn#6V2 —X— 16-15,16-15,16-15V1 —9— 16-17,16-17A,16-17AVVP03V0 CC - Min centre to center distance or covergent point, SF - min separation factor, ES- min ellipse separation 10/192015 10: 11 22A Page 12 COMPASS 5000.1 Build 61 BP US Fag P Travelling Cylinder Report BAKER " HUGHES Company: Project: Reference Site: Site Error: Reference Well: Well Error: Reference Wellbore Reference Design: North America - ALASKA - BP Prudhoe Bay PB DS 16 0.00 usft 16-15 0.00 usft 16-15A 16-15AWP11 Local Co-ordinate Reference: NO Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 16-15 Mean Sea Levet orkb @ 70.00usft True Minimum Curvature 1.00 sigma EDM R5K- Alaska PROD - ANCP1 Offset Datum Reference Depths are relative to orkb @ 70.00usft Coordinates are relative to: 16-15 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04 Central Meridian is 150° 0'0 000 W Grid Convergence at Surface is: 1.66 ° 0 Separation Factor Plot 03-13,03-13,03-13V1 03-14,03-14,03-14 V1 $ 03-14,03-148,03-146VO 170711177 LEGEND -*- 03-36,0336A,03-36AV5 -W 0336,03-36A,Plan#6V2 -F 16-15,16-15,16-15V1 —lt— 16 -17,16 -17A,16 -17A VVP03 V0 CC -Min centre to center distance or covergent point, SF -min separation factor, ES -min ellipse separation 10/19/2015 1D11:22AM Page 13 COMPASS 5000.1 Build 61 JA+ FeA S by Travelling Cylinder •• der Report BAKER HUGHES Company: North America - ALASKA - BP Project: Prudhoe Bay Reference Site: PS DS 16 Site Error: 0,00 usft Reference Well: 16-15 Well Error: 0.00 usft Reference Wellbore 1&15A Reference Design: 16-15A WP11 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 16-15 Mean Sea Level orkb @ 70.00usft True Minimum Curvature 1.00 sigma EDM R5K-Alaska PROD -ANCP1 Offset Datum Reference Depths are relative to orkb @ 70.00usft Coordinates are relative to: 16-15 Offset Depths are relative to Offset Datum Coordinate System is US State Plane 1927 (Exact solution), Alaska Zone 04 Central Meridian is 150' 0'0.000 W Grid Convergence at Surface is: 1.66 ° M Travelling Cylinder Plot 0 --- _tis90-- - 330 I \ 30 �,- 1080.._. " X11075 540 270 - 10940 10890 240 10700 11030 540 i 10825 1080 / 10855, 113511 M., 11725 12200 90 11700 fir::R7 210 1890 150 . -- 180 Azimuth from North [°] vs Centre to Centre Separation [900 usft/in] LEGEND 120 $- 0313,0313,0313V1 $ 0336,0336A,0336AV5 -% 16x17,16-17A,16.17AVYP03V0 -4- 03-14,03-14,0314V1 -E 0336,03.36A,Plang6V2 $ 0314,03146,03146\10 -E- 16-15,1615,16-15V1 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 10/19/2015 10.71:22AM Page 14 COMPASS 5000.1 Build 61 NORDIC-CALISTA RIG 1 CHOKE / REEL/CIRCULATION MANIFOLD DIAGRAM ]Q3,,2013 V12 VUde caseee V20 V14 vts wt Turned.....14nfi"s0o0 psi eoP's to=].B6" PGGR BGr j V2 V1 V 16 BF.lrpR VB 1. vn BOP2 BOPS BOP3 BOP4 To Poor Boy Gas Buster Vq ! V V19 V19 HCR V9 Check Valve BOPS Manual CM1oka __________ _________ _________________ _mca___ _________ BOP6 BOP] IUiesel P P Line Lin CPFba Heap 5 59 51 Mdion tla Tum Hulce BOP Cellar. manilolE 9WOG 56 CM 1 56 CM2 CM3 CM 4 P retrans0urorm COFIea Hose CMS R13 To Coiled Tubtng Bketl ON Inner Reel Valve Cip Gre nd Leeol Tie-in R1B CV] R] TBYntl Pipe R10 ft11 a� 1,11,19 Pressure Tr En[e Manual Choke . More R14 R2 ApA6 R9 R6 PSq MM1 MM2 9 MMB Oil R1MWWe R17 R15 R12 R5 Tiger Tank Mutl Pumv 2 R] O Baker MM3 MP1&MP2 l+� Choke Kill CW P51 1. Fine Line Rid Flom Mud Pump#1 PB Q O Cvt T"ryer Ynk - - To Mangold 441. PS 2 Reyorse Circulating line I CT CoFWx Hous TREE = McEVOY GEN4 WELLHEAD= MOEVOY ACTUATOR= BAKERC OIB. ELEV = 70' BE E -EV = S O7/0921:6 KOP= 3282' Max Angle = 50' @ 6700' Datum MD= 1093T Datum TVD= 88W SS 16--I5A Proposed "FL nES:—CHROMETBG**a` W 19-5/8" X 7" ZXP LTP w /HMC HGR, ID = 6.25" I 7" LNR-TIEBACK, 26#, L-80, .0383 bpf, D = 6.276" 11 10574' 3.70" BKR DEPLOY SLV, ID = 3.00" @ 10,594' MD 3-1/2" X NIP, ID= 2.813" @ 10,604' MD Minimum ID =3.725"@ 11040' 4-1/2" HES XN NIPPLE 4-1/2" TBG, 12.6#, 13CM .0152 bpf, D = 3.958" 10645' 9-5/8" CSG. 47#. L-80 BTRS. D = 8.681' 1�7aw---1 PERFORATION SUMMARY REF LOG: BHGS ON 12/14/85 ANGLE AT TOP PERF: 39•® 10870' Note: Rafe/ to Production OB for OUtoficalpeff data SIZE SPF INTERVAL Opn/Sqx SHOT SOZ 3-31e• 4 10:70 - 10:91 S O7/0921:6 1 3- 4 1067a - 10b92 O 0611 2166 KBG-2-LS 3-3/8• 4 10697 - 10915 :n z16: O 0:;i 2 3-3/8• 4 10:19a-10933 0 0:/12168 KBG-2-LS 3-31:• 4 10919 - 10933 s 0]/091:6 3 3-3 /6' 4 1093: - 10948 O 06/121:8 I0G2-LS 3-3/e• 4 10630 - 10949 3 0710 ale: 4 3-316- 4 10959 - 11006 0 0611 L9 KBG-2-LS 3-3/6• 4 10959 - 11006 S 07/091a:fi 5 3-3/8• a 11045 - 11065 O 0611 3109 KBG-2-LS 3-3/6• 2 11060 - 11088 O 10/19/92 6 3-3/8• 1/2 11060 - 11060 8 08/23/86 KBG-2-LS 3-3/8• 6 11075 - 11095 O de/13109 4-1/2" x 7" Baker whipstock @ 10,822' MD' 7" x 4-1/2' Posi-Set Plug @ 10,870' M STOP OF 4-1/2" TBG 4-1/2' TBG, 12.6#. 13CR..0152 bpf, D = 3.958" PBTD 11342' = 6.184"11388' GAS LF7 MANDRB.S ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 3309 3306 10 KBG-2-LS DMY BJr 0 08/20/06 2 3701 3686 17 KBG-2-LS DMY INT 0 05/29/14 3 6872 5987 50 I0G2-LS DW INT 0 05/29/14 4 9026 7503 44 KBG-2-LS DMI' INT 0 03/05/98 5 9733 7984 48 KBG-2-LS DMY INT 0 08/13/06 6 10363 8430 41 KBG-2-LS DMY INT 0 03/05/98 10590' —j 7" X 4-12" TW FBBP-T PKR, D = 1062W 4-1/2"HESXNP,D=3.813" I 10645 --j4-1/2"TU13NGTALWLEG,D=4.000" E MD TT NOT LOGGED 3-1/2" 9.3'# STL 13CR-80 1/2"x 3-1/4" XO @ 10800 3-1/4" 6.6# HYD511 13CR-80 1 /4"x 2-7/8" XO @ 10925 2x RA TAG 2-7/8" 6.5# HYD511 13CR-80 @ 12,770' 11025' 7"X 4.5'TWD PKR, D=3.946' COMvHJTS DATE 11039' 12/14/85 4-1/2" HES XN NP, D = 3.725" 11042' 06/03/14 4-1/2" TUBING TAIL, D = 3.854' 11042' HELM TT LOGGED 0225/92 DATE REV BY COMvHJTS DATE REV BY COMMENTS 12/14/85 ORIGINAL COMPLETION 06/03/14 JLS/JMD GLV CIO (05/29/14) 12/18/91 RM 06/05/14 JMD ISO PKR ASSY DEPM EDIT 03/05/98 WES LAST WORKOVER 07/14/01 MYTP DORRECnONS 0725/09 PJP/PJC PERF RE= LOG UPDATE 09/28/09 AT//SV ADPERF(08/13/09) PRUDHOE BAY UNIT WELL: 16-15 PERMIT No: 1852640 API Nb: 50-029-21474-00 Sec. 24, TION, R15E, 141T I & 505' FWL BP Exploration (Alaska) TRff= WEVOY GE44 WELLHEAD= WEVOY ACTUATOR= BAKER OKB. ELEV = 70' BF. ELEV = 33/8' KOP= 3262' Max Angle = 50' Q 6700' Datum MU = 10937' Datum TVD= 8809SS I TOP OF 7' LMR -TIEBACK I 1 7- LNR-TEAM 266, L-80, .0383 bpf, ID = 6.276' I- 1057, Minimum ID = 3.725" @ 11040' 4-1/2" HES XN NIPPLE 4-1/2' TBG, 12.6#, 13CR .0152 bpf, D = 3.958' 10645' 9-5/8' CSG. 47#. L-80 BTRS. D = 8.681' — 1 PEWORATION SUMI.4ARY REF LOG: BHCS ON 12/14/95 ANGLE AT TOP PERF: 38" Q 10870' Note: Refer to Production DB for historical perf data SIZE SPF NTERVAL Opn/Sgz SHOT SOZ 33/8' 4 10878 - 10891 S 07/09/86 10 3-38' 4 10879 - 10892 O 06/12/88 2 3-3/8' 4 10897 - 10915 O 06/12/88 M 3-3/8' 4 10918- 10933 O 06/12/88 50 3-38" 4 10918 - 10933 S 07/09/86 4 3-38' 4 10936 - 10949 O 06/12/88 M 3-38' 4 10936 - 10949 S 07/09/86 48 138' 4 10959 - 11006 O 06/12/88 6 138' 4 10959 - 11006 S 07/09/86 NT 138' 6 11045 - 11065 O 08/13/09 13/8' 2 11060 - 11066 O 10/19/92 138' 12 11060 - 11080 S 0623/86 138' 6 11075 - 11095 O 08/13/09 1TOP OF 4-12" TBG 1— 11025' 4-1/2' TBG, 12.6#, 13C R. .0152 bpf, D = 3.958' 11042' PBTD 11342' T LHR, 29#, "0 BTRS, .0371 bpf, D = 6.184" 11388'_ 16-15 SAFE. JTES: """CHROMETBG- 2207' 4-1 /2' CAMCO BAL-O SSSV NP, ID = 3.812' O GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 1 3309 3306 10 KBG-2-LS DMY M 0 08/20/06 2 3701 3686 17 KBG-2-LS DMW M 0 0529/14 3 6872 5987 50 KBG-2-LS DMV M 0 05/29/14 4 9026 7503 44 KBG-2-LS DMY M 0 03/05/98 5 9733 7984 48 KBG-2-LS DMV NT 0 08/13/06 6 10363 8430 41 KBG-2-LS DMY NT 0 03/05/98 10590' 7- X 4-1/2' TNV FIBBP-T PKR, D = 3.912' 10624' 4-12" FES X W,, D = 3.813' 10645'i4-12'TUBINGTALWLEG, D=4.000' ELMD TT NOT LOGGED 1 11025' —j7-X4.5-TWDPKR,D=3.946' 11039' 4-1/2' FES XN NP, D = 3.725' 11042' 4-12' TUBING TAIL, D = 3.854' 11042' ELM TT LOGGED 02/2582 DATE REV BY ODWE ITS DATE REV BY COMu81TS 12!1485 ORIGINAL COMPLETION 06103/14 JLS/JMD GLV GO (05/29114) 1211881 RWO 06/05/14 JMD ISO PKR ASSY DEPTH EDIT 03105198 WES LAST WORKOVER 07/14101 F WT'P CORRECTDNS 0725109 PJP/PJC PERF REF LOG UPDATE 0928109 MN/SV ADFE2F (08113/09) PRUDHOE BAY UNIT WELL 1615 PERMIT No: 1852640 AR No: 50-029-21474-00 Sec. 24, T10H R15F 1417' FNL 8 505' FML BP Exploration (Alaska) TRANSMITTAL LETTER CHECKLIST WELL NAME: %(p —15,0 / PTD: 7 V Development —Service Exploratory _ Stratigraphic Test —Non -Conventional FIELD: ���' POOL: {�!/ Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50-_-_- - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - _-_) from records, data and logs acquired for well name on permit . The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. hi addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool PRUDHOE BAY, PRUDHOE OIL - 640150 Well Name: PRUDHOE-BAY UNIT 16_15A Program DEV Well bore seg ❑ - - - PTD#:2151870 Company BP EXPLORATION (ALASKA) -. Initial Class/Type DEV/PEND GeoArea 890. __ Unit 11650 _ On/Off Shore On _ Annular Disoosal n Appr Date SFD 10/26/2015 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Lease number appropriate Unique well name and number Well located in defined pool Well located proper distance from drilling unit boundary Well located proper distance. from other wells Sufficient acreage available in drilling unit If deviated, is wellbore plat included Operator only affected party - Operator has appropriate bond in force Permit can be issued without conservation order Permit can be issued without administrativeapproval Can permit be approved before 15 -day wait. Well located within area andstrataauthorized by Injection Order# (put 10# in comments) (For All wells within 1/4 mile area of review identified (For service well only) Pre -produced injector; duration of pre -production less than 3 months (For service well only) Nonconven. gas conforms to AS31.05.030lj.1.A),(j.2.A-D) Conductor string provided - Surface casing protects all known USDWs CMT. vol adequate. to circulate on conductor & surfcsg CMT vol adequate to tie-in long string to surf csg CMT will cover all known productive horizons Casing designs adequate for C, T, B & permafrost Adequate tankage or reserve pit If a re -drill, has a 10-403 for abandonment been approved Adequate wellbore separation proposed If diverter required, does it meet regulations Drilling fluid program schematic .& equip list adequate BOPEs, do they meet regulation BOPE press rating appropriate; test to (put psig in comments) Choke. manifold complies w/API. RP -53 (May 84) Work will occur without operation shutdown Is presence of H2S gas. probable Mechanical condition of wells within AOR verified (For service well only) Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes NA NA NA NA NA NA NA NA Yes Yes Yes Yes Yes NA Yes Yes Yes Yes Yes Yes NA 35 Permit can be issued w/o hydrogen sulfide measures No Geology 36 Data presented on potential overpressure zones Yes Appr Date 37 Seismic analysis of shallow gas zones NA SFD 10/26/2015 38 Seabed condition survey (if off -shore) NA. 39 Contact name/phone for weekly progress reports. [exploratory only] NA Entire Well lies within ADL0028332. PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 341F CO 341 F, Rule 2: There shall be no restrictions as to well spacing except that no pay shall be opened in a well closer than 500 feet to the boundary of the affected area. Planned well conforms to CO 341F, Rule 2. Conductor set in PBU 16-15 Surface casing set in PBU 16-15 Surface casing set and fully cemented Productive interval will be completed with cemented production liner and perforated Rig has steel tanks; all waste to approved disposal wells PTD 185-264, Sundry 315-662 Anti -collision analysis complete; no major risk failures Max formation pres. is 3576 psig(7.7 ppg EMW );.will drill w/ 8.4 ppg EMW MPSP is 2684 psig; will test BOPS to 3500-psig H2S measures required DS 16 wells are 112S -bearing. H2S measures. are required. Planned drilling mud program (8.4 ppg) appears adequate to control operator's forecast pore pressure gradient of about 7.7 ppg. Should higher pore pressures be encountered, BP has immediate access to nearby fluid. mixing facilities. Geologic 18 Engineering 19 Date: 20 n js 21 ���,� 22 23 24 25 26 27 Appr Date 28 VTL 10/27/2015 29 30 31 32 33 34 Lease number appropriate Unique well name and number Well located in defined pool Well located proper distance from drilling unit boundary Well located proper distance. from other wells Sufficient acreage available in drilling unit If deviated, is wellbore plat included Operator only affected party - Operator has appropriate bond in force Permit can be issued without conservation order Permit can be issued without administrativeapproval Can permit be approved before 15 -day wait. Well located within area andstrataauthorized by Injection Order# (put 10# in comments) (For All wells within 1/4 mile area of review identified (For service well only) Pre -produced injector; duration of pre -production less than 3 months (For service well only) Nonconven. gas conforms to AS31.05.030lj.1.A),(j.2.A-D) Conductor string provided - Surface casing protects all known USDWs CMT. vol adequate. to circulate on conductor & surfcsg CMT vol adequate to tie-in long string to surf csg CMT will cover all known productive horizons Casing designs adequate for C, T, B & permafrost Adequate tankage or reserve pit If a re -drill, has a 10-403 for abandonment been approved Adequate wellbore separation proposed If diverter required, does it meet regulations Drilling fluid program schematic .& equip list adequate BOPEs, do they meet regulation BOPE press rating appropriate; test to (put psig in comments) Choke. manifold complies w/API. RP -53 (May 84) Work will occur without operation shutdown Is presence of H2S gas. probable Mechanical condition of wells within AOR verified (For service well only) Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes NA NA NA NA NA NA NA NA Yes Yes Yes Yes Yes NA Yes Yes Yes Yes Yes Yes NA 35 Permit can be issued w/o hydrogen sulfide measures No Geology 36 Data presented on potential overpressure zones Yes Appr Date 37 Seismic analysis of shallow gas zones NA SFD 10/26/2015 38 Seabed condition survey (if off -shore) NA. 39 Contact name/phone for weekly progress reports. [exploratory only] NA Entire Well lies within ADL0028332. PRUDHOE BAY, PRUDHOE OIL POOL - 64015, governed by CO 341F CO 341 F, Rule 2: There shall be no restrictions as to well spacing except that no pay shall be opened in a well closer than 500 feet to the boundary of the affected area. Planned well conforms to CO 341F, Rule 2. Conductor set in PBU 16-15 Surface casing set in PBU 16-15 Surface casing set and fully cemented Productive interval will be completed with cemented production liner and perforated Rig has steel tanks; all waste to approved disposal wells PTD 185-264, Sundry 315-662 Anti -collision analysis complete; no major risk failures Max formation pres. is 3576 psig(7.7 ppg EMW );.will drill w/ 8.4 ppg EMW MPSP is 2684 psig; will test BOPS to 3500-psig H2S measures required DS 16 wells are 112S -bearing. H2S measures. are required. Planned drilling mud program (8.4 ppg) appears adequate to control operator's forecast pore pressure gradient of about 7.7 ppg. Should higher pore pressures be encountered, BP has immediate access to nearby fluid. mixing facilities. Geologic Engineering Public Commissioner: Date: Commissio r: Date Commissioner Date n js Cpl �si� ���,�