Oil and Gas Conservation Connnission
To' Well File: Prudhoe Bay Unit Permit # 195-147 July 9, 2002
Re: Administrative Abandonment Action
Prudhoe Bay Unit Y-14A, Permit # 195-147
This memo will remain at the front of the subject well file.
Well PBU Y-14A was replaced by PBU Y-14B (permit # 201-101, AP1 # 50-029-21832-02) when the
permit was approved 05/23/2001. The replacement well incorporates an extension to a new bottom hole
location using the existing well bore. This extension, along with the original hole, will be used for
production of hydrocarbons. A review of both well files indicates administrative abandonment of the
originating well bore is appropriate according to current AOGCC procedures for wells where additional
permitted extension is drilled from an existing well bore.
20 AAC 25.005(a) requires a Permit to Drill for each hole drilled below the conductor unless drilled to
straighten the original hole, sidetrack junk, or correct mechanical difficulties. In addition, AOGCC
databases require each conductor has only one permit number and API number. Administrative
abandonment of the original permit only eliminates duplication in the databases. Information for the
original well and its replacement will be maintained in their respective files.
The operator has been notified of this action. All future correspondence with the AOGCC should reflect
the new permit number, API number and well data.
Statistical Technicia eservoir Engineer
Petroleum Geologist~~JJ~mmissioner
SGANNED JUL ! 0 2DD2
A~~l~k OIL ~ GA~
CONSERYATIO~ COM)IISSIO~
TONY KNOWLES, GOVERNOR
333 W. 7TM AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
July 9, 2002
Mr. Randy Frazier
Wells Delivery Manager
Phillips Alaska, Inc.
P O Box 196612
Anchorage, AK 99519-6612
Dear Mr. Frazier,
Re:
Administrative Abandonment Action
Prudhoe Bay Unit Y'14A, Permit St 195-147
Well PBU Y-14A was replaced by PBU Y-14B (permit St 201-101, API St 50-029-21832-02) when the
permit was approved 05/23/2001. The replacement well incorporates an extension to a new bottom hole
location using the existing well bore. The extension, along with the original hole, will be used for
production of hydrocarbons. A review of both well files indicates administrative abandonment of the
originating well bore is appropriate according to current AOGCC procedures for wells where additional
permitted extension are drilled from an existing well bore.
20 AAC 25.005(a) requires a Permit to Drill for each hole drilled below the conductor unless drilled to
straighten the original hole, sidetrack junk, or correct mechanical difficulties. In addition, AOGCC
databases require each conductor has only one permit number and API number. Administrative
abandonment of the original permit only eliminates duplication in the databases. Information for the
original well and its replacement will be maintained in their respective files.
Please notify other cognizant personnel in your organization so that the well will be correctly identified
on subsequent reports and applications submitted to the Commission.
Sincerely,
Steve McMains
Statistical Technician
AOGCC
cc: Terri Hubble
SCANNED JUL 1 6 2002
BEFORE
W
i~__.L~¢ E F' Z A J
., . 00 .... i 1259 'i'~/-,,
~ 0 0 0 .... i 0 '2 0 0 F' .T.i...] At
'i 0~07 -R ,'~'r',i*4PL~TZC, N~ ,: E, AT.. ~: It /' t /'" ¢¢J,~ ~,'" d~(~'" ~,"
Ar'e dr'y
W,-::;,., s i: h e
Ar.e we'i '1
'$ 'S, H H E N T :5
c: o rr~ p 'i '"i' a iq c
i n 'i' t '¥ a 'i
HOWARD OKLAND
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHOP~AGE
AK, 99501.
Date:
RE:
3 September 1996
Transmittal of Data
ECC #: 6754.00
Sent by: HAND CARRY
Data: LDWG
Dear Sir/Madam,
Reference:
PRUDHOE BAY
NORTH SLOPE, AK
Enclosed, please find the data as described below:
Prints/Films: 1 PDK FINAL BL+RF Run # 1
Please sign and return to: Attn. Rodney D. Paulson
Western Atlas Log.qing Services
5600 B Street ........
Suite 201 ", .... - ........
Anchorage, 'AK' 99518
-- Or FAX to (907)._563-7803
Received by Date:
~ .
_.
SEP 1 0 199~
~chorage
HOWARD OKLAND
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 9 September 1996
RE: Transmittal of Data
Sent by: HAND CARRY
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL
c-21 (32-19-11-14)
P-01 (33-27211-13)
Y-36 (41-27-11-13)
M-12
Y-14A
B-02A
DESCRIPTION
1 PFC/PERF FIELD BL+RF
1 CN FINAL BL+RF
1 GR/CCL FINAL BL+RF
1 PLS FINAL BL+RF
1 PFC/PERF FINAL BL+RF
1 PLS FINAL BL+RF
1 PLS FINAL BL+RF
1 PLS FINAL BL+RF
1 PLS FINAL BL+RF
1 PDK FINAL BL+RF
1 SBT FINAL BL+RF
ECC No.
Run # 1 4352.05
Run # 1 5789.02
Run # 1 5851.03
Run # 1 5863.07
Run # 1 6054.08
Run # 1 6619.01
Run # 1 6625.01
Run # 1 6631.02
Run # 1 6654.06
Run # 1 6679.01
Run # 1 6721.07
Please sign and return to: Attn. Rodney D. Paulson
Western Atlas Logging Services
5600 B Street
Suite 201
Anchorage, AK 99518
Or FAX to (907) 563-7803
Received by: Date:
0 IR I I..I--I I~i G S EIR~./I C E S
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.' Howard Okland
3001 Porcupine Dr.
Anchorage, Alaska 99501
RE: MWD FormafionEvaluafionLogs - Y-14A AK-MM-951054
September 03, 1996
The technical data listed below is being submitted herewith. Please acknowledge receipt by remming a
signed copy of this transmittal letter to the attention of~
Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
1 LDWG formatted LIS tape with verification listing.
APl#: 50-029-21832-01
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252
A Dresser Industries, Inc. Company
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
~--'~, 99501.
Date: 19 March 1996
Transmittal of Data
Sent by: HAND CARRY
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL
DESCRIPTION
1 CN FINAL BL+RF
1 CCL FINAL BL+RF
! PFC/PERF FINAL BL+RF
1 GR/CCL FINAL BL+RF
1 SBT FINAL BL+RF
1 PFC/PERF FINAL BL+RF
Run # 1
Run # 1
Run ~ 1
Run # 1
Run # 1
Run # 1
ECC No.
5855.05
6036.08
6625.00
6626.00
Please sign and return to: Attn. Rodney D. Paulson
Western Atlas Logging Services
5600 B Street
Suite 201
Received by:
Anchorage, AK 99518
Or FAX to (907) 563-7803
(~~ -- Date:
,~Jaska Oil & Gas Cons. Commission
Anchorage
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Comervation Comm.
Attn: Larry Grant
3001 Porcupine Dr. (~?~ "i ~
Anchorage, Alaska 99501
MWD Formation Evaluation Logs - Y-14A, AK-MM-951054
February 27, 1996
The technical data listed below is being submitted herewith. Please acknowledge receipt by
returning a signed copy of this of this transmittal letter to the attention of:
Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
2" x 5" MD Resistivity and Gamma Ray Logs:
50-029-21832-01
1 Blueline
1 Rev Folded Sepia
2" x 5" TVD Resistivity and Gamma Ray Logs:
50-029-21832-01
1 Blueline
1 Rev Folded Sepia
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252
A Dresser Industries, Inc, Company
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMP LETION REPORT AND LOG
I1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
.B. P Exploration 95-147
3. Address 8. APl Number
P. O. Box 196612, Anchora~le, Alaska 99519-6612 50-029-21832-01
i4. Location of well at surface 9. Unit or Lease Name
492' SNL, 4572' WEL, SEC, 34, T11N, R13E i' ~:il~:, ~.~ ~:.~ .._~~:'~ ...... i'~' .......... Prudhoe Bay Unit
At Top Producing Interval~; .2.~,,~._.~///~- -./~'--' _~' ii!~~ 10. Well Number
4293' SNL, 353' WEL, SEC, 33, T11N, R13E ~ '~, ' Y-14A
; :.~,-;~'~;:.,' il ..... 'i' " 11. Field and Pool
At Total Depth '- '"(~-/"~--: '."i' .' Prudhoe Bay Field/Prudhoe Bay Pool
4986' SNL, 718' WEL, SEC. 33, T11N, R13E
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No.
KBE = 82.88 ADL 028287
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 16. No. of Completions
10/20/95 10/27/95 11/01/95I N/A feet MSL One
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set 21. Thickness of Permafrost
11300'MD/9000' TVD 11300'MD/9000' TVD YES [] NO [] 2192 feet MD 1900' (Approx.)
22. Type Electric or Other Logs Run
MWD, L WD/FE, GR
23. CASING, LINER AND CEMENTING RECORD
SE'FRNG DEPTH MD
CASING SIZE WT'. PER FT. GRADE TOP BO-Iq'OM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" Cond Surface 110' 8 cu yd Concrete
13-3/8" 68# L-80 Surface 2686' 17-1/2" 3723 cu ft Arctic Set II & III
9-5/8" 47# L-80 NSCC Surface 6991' 12-1/4"
9-5/8" 47# L-80 Butt 6991' 9416' 12-1/4" 2116 cuft Class 'G'
7" 29# L-80 9243' 10541' 8-1/2" 298 cuft Class 'G'
4-1/2" 12.6# L-80 10398' 11300' 6" Uncemented Slotted Liner
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
4-1/2" Slotted Liner 4-1/2" 10093' 10036'
MD TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
10532'- 10614' 8978'- 8985' Freeze Protected w/140 bbls Diesel
10649'- 10769' 8987'- 8985'
10868' - 11154' 8987' - 8996'
11156' - 11276' 8996' - 8999'
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
November 10, 1995 Gas Lift
Date of Test Hours Tested PRODUCTION FOR OlL-BBL GAS-MCF WATER-BBL CHOKE SlZE IGAS-OIL RATIO
TEST PERIOD II~
I
Flow Tubing Casing Pressure CALCULATED,,~ DIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips.
·
ORIGINAL
~%1~;L;3~.~ .......
~,'.
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
/9. 30.
GEOLOGIC MARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase.
Sag River 10160' 8873'
Shublik 10201' 8896'
Top of Sadlerochit 10515' 8977'
31. LIST OF ATTACHMENTS
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ¢~"~ /~/~/ ~ Title SeniorDrillincEngineer Date /¢/¢~
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23' Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
BP/AAI SHARED SERVICE
DAILY OPERATIONS
PAGE: 1
WELL: Y-14A
BOROUGH: NORTH SLOPE
UNIT: PRUDHOE BAY
FIELD: PRUDHOE BAY
LEASE:
API: 50-
PERMIT:
APPROVAL:
ACCEPT: 10/16/95 01:00
SPUD:
RELEASE: 11/01/95 05:30
OPERATION:
DRLG RIG: DOYON 14
WO/C RIG: DOYON 14
10/17/95 ( 1)
TD: 0' ( 0)
10/18/95 (2)
TD: 0' ( 0)
10/19/95 (3)
TD: 9456' (9456)
10/20/95 (4)
TD: 9216' ( 0)
10/21/95 (5)
TD: 9580' ( 364)
10/22/95 ( 6)
TD:10038' ( 458)
10/23/95 (7)
TD:10489' ( 451)
PULL TBG HANGER MW: 0.0 VIS: 0
MOVED RIG OVER WELL, ACCEPTED RIG 10/16/95 13:00 HRS. RIG
UP AND EQUIPMENT WORK. R/U TO PULL TUBING HANGER.
SERVICED TUBING HANDLING EQUIP MW: 0.0 VIS: 0
PULL SINGLE COMPLETION, 3-1/2" OD. CBU AT 9525'. L/D TUBING
T/2000'. M/U AND SET HOWCO STORM PACKER. PACKER SET WITH
VALVE 2' BELOW LDS. CHANGED OUT AND TESTED PACKOFF. CHANGED
BLIND RAMS FOR SHEAR RAMS. TEST BOPE, WAIVED BY AOGCC, DOUG
AMOS. INSTALLED WEAR RING. PULLED AND L/D HOWCO STORM
PACKER. L/D TUBING T/7525'. TUBING HANDLING EQUIPMENT
CHANGED OUT.
MILLED CASING AT 9456' MW: 0.0 VIS: 0
BHA #1, SINGLED IN DP T/9536', TOP OF FISH. TAGGED TOP OF
3-1/2" STUMP, CUT AT 9525' WLM. CIRC, HOLE DISPLACED WITH
WATER BASED MUD. MILLED CSING AT 9456' (MOVED SECTION 16'
LOWER THAN PLANNED TO AVOID STARTING SECTION AT A COLLAR.)
BHA #2, ORIENT MWD MW: 0.0 VIS: 0
BHA #1, MILLED CASING 9416' TO 9466'. CBU, POOH, MU 5" MULE
SHOE AND RIH. RAN DP T/9523', BOTTOM OF SECTION AT 9466'
PREVIOUS TAG OF 3-1/2" TBG AT 9536'. ATTEMPTED TO WASH
DEEPER, NO SUCCESS. BATCH MIX AND PUMP CEMENT SLURRY.
EXPECT TOC AT 9216'. CBU, INJECTIVITY TEST, UNABLE TO
INJECT FLUID. PULLED DP T/0'. WASHED, FLUSH BOP STACK. BHA
#2, ORIENT AND CALIBRATE MWD TOOL.
DRILLED T/9580' MW: 0.0 VIS: 0
BHA #2, RIH T/9152'. BREAK CIRC EVERY 1000' CBU, WASH AND
REAM TO TOC AT 9290'. DRILL FIRM CEMENT F/9~90' TO 9421'
TOP OF SECTION AT 9416'. DRILLED T/9466', PAST CASING STUB.
DRILLED T/9580'
RIH T/2500' MW: 0.0 VIS: 0
BHA %2, DRILLED T/10038', REACHED PLANNED END OF RUN. CBU,
POOH T/O' BHA ~3, RIH T/2500'
DRILLED T/10489' MW: 0.0 VIS: 0
BHA #3, RIH T/10008' LOGGED HOLE WITH LWD. MAD PASS TIE-IN
WITH GR. BENCHMARK SURVEY AT 10011' DRILLED T/10489'
WELL : Y-14A
OPERATION:
RIG : DOYON 14
PAGE: 2
10/24/95 (8)
TD:10551' ( 62)
10/25/95 (9)
TD:10551
PB: 0
10/26/95 (10)
TD:10677' ( 126)
10/27/95 (tl)
TD:ll081' ( 404)
10/28/95 (12)
TD:ll300' ( 219)
10/29/95 (13)
TD:ll300' ( 0)
10/30/95 (14)
TD:ll300
PB:ll300
PUMP HI VIS SWEEP MW: 0.0 VIS: 0
BHA ~3, DRILLED T/10551', REACHED PLANNED END OF RUN. CBU,
POOH T/400'. PULLED BHA. BHA #4, HOLE OPENER RUN. RIH
T/10009, REAMED T/10551'. CBU, POOH T/9965'. RIH T/10551',
WORKED TIGHT SPOT AT 10165'. CIRC, PUMP HI VIS SWEEP.
PULLED DP T/0' MW: 0.0
BHA ~4, CBU AT 10551' PULL AND LAID OUT BHA. R/U CASING
HANDLING EQUIPMENT. RAN CASING T/1310', CBU. RAN CASING
T/9400', CIRC. BROKE CIRCULATION, RAN CASING T/10541',
SETTING DEPTH BATCH MIX AND PUMP CEMENT SLURRY. PLUG
BUMPED, RELEASED HANGER, ENGAGE DOGS AND SET PACKER. CIP AT
0100 HRS. REVERSE CBU AT 9243'. PULLED DP T/0'
DRILLING MW: 0.0 VIS: 0
PULLED DP T/0', L/D BAKER RUNNING TOOL. TEST BOP'S AND
MANIFOLD. WITNESS WAIVED BY J. SPAULDING - AOGCC. BHA #5,
RIH T/10369'. TAG UP ON CEMENT STRINGER. LANDING COLLAR AT
10453'. PRESSURE TEST CASING. DRILLED CEMENT T/10555',
CIRC. DRILLED T/10677'
RIH T/1000' MW: 0.0 VIS: 0
BHA #5, DRILLED T/il081', DOWNHOLE WASHOUT. POOH T/0',
FOUND 2 WASHOUTS IN STRING. BHA #6, RIH T/1000'
REAMED T/10865' MW: 0.0 VIS: 0
BHA #6, RIH T/11026', REAMED T/l1081' DRILLED T/il300',
REACHED PLANNED END OF RUN. CBU, POOH T/0', DOWNLOAD MWD.
BHA #7, HOLE OPENER RUN. RIH T/10551', REAMED T/10865'
TESTING ANNULUS MW: 0.0 VIS: 0
BHA #7, REAMED T/11300' CBU, POOH T/10540', RIH T/11300'
PULLED BHA. R/U CASING HANDLING EQUIPMENT. RAN 4-1/2"
SLOTTED LINER T/920'. HANGER ASSEMBLY INSTALLED. RAN DP
T/10530', CIRC. RISER DISPLACED. RIH W/LINER TO BOTTOM, NO
PROBLEMS. CIRC AT 11300', DROP BALL. PUMP MUD, SPACER AND
DISPLACE TO SEAWATER. PACKER SET, TESTING ANNULUS.
SHEAR OUT DUMP VALVE MW: 0.0
CIRC AT 11300', TESTED ANNULUS, RELEASE F/PACKER. CONTINUE
DISPLACEMENT TO SEAWATER. PULLED DP T/10350', CIRC. PULLED
DP T/0', L/D TUBING.BAKER CTC ECP INFLATION RUN. R/U
HANDLING TOOLS, P/U HIT TOOL AND TUBING. RIH T/10849',
SETTING DEPTH. CIRC, R/U BJ. TEST LINES, ARM DOGS IN TOOL,
LOCATE INTO PROFILE, SHEAR BALL. PUMP PREFLUSH. DROP DART,
PUMP CEMENT, DROP SPONGE. PUMP POSTFLUSH, ALIGN TO RIG
PUMPS. DROPPED BALL, CIRC AT 10849'. INJECTIVITY TEST,
COMPLETED. POOH T/10447', REVERSE CIRC. SHEAR OUT DUMP
VALVE, REVERSE OUT POST FLUSH.
WELL · Y-14A
OPERATION:
RIG : DOYON 14
PAGE: 3
10/31/95 (15)
TD:ll300
PB:ll300
11/Ol/95 (16)
TD:ll300
?B:l1300
RUNNING 4-1/2" COMPLETION MW: 0.0
POOH W/CTC HORIZONTAL INFLTATION TOOL. L/D HIT TOOL. BHA #8,
CLEANOUT RUN FOR CEMENT AND TO SPOT BLEACH BREAKER. RIH
T/11154', TAG 7" LINER TOP. WASHED PAST W/NO PROBLEMS. CIRC,
ACID SPOTTED DOWNHOLE. L/D DP, TEST WELL CONTROL EQUIPMENT.
BEGAN RUNNING 4-1/2" COMPLETION.
RIG RELEASE MW: 0.0
RAN 4-1/2" TUBING AND 6 GLM'S. SCSSV NIPPLE ASSEMBLY
INSTALLED. LANDED TUBING AND LOCKDOWN HANGER. SET PACKER AT
10035' PRESSURE TESTED TUBING. R/D BOP STACK. INSTALLED
XMAS TREE. FREEZE PROTECT WELL. SET BPV, SECURE WELL. RIG
RELEASED AT 05:30 11/01/95.
SIGNATURE:
(drilling superintendent)
DATE:
SPF~---~Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU/Y-14A
5oo2921832o1
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/30/95
DATE OF SURVEY: 102895
MWD SURVEY
JOB NUMBER: AK-MM-951054
KELLY BUSHING ELEV. = 82.88
OPERATOR: BP EXPLORATION
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
9403.08 8309.56 8226.68
9416.00 8320.10 8237.22
9421.00 8324.18 8241.30
9593.97 8461.14 8378.26
9688.47 8531.32 8448.44
35 22 S 23.08 W .00 3068.50S 657.71W
35 16 S 23.27 W 1.20 3075.37S 660.65W
35 13 S 23.34 W 1.12 3078.02S 661.79W
40 4 S 29.79 W 3.61 3172.24S 709.27W
43 58 S 29.89 W 4.13 3227.11S 740.75W
3123.15
3130.59
3133.46
3237.67
3299.51
9781.74 8599.07 8516.19
9875.15 8668.03 8585.15
9968.78 8737.79 8654.91
10007.28 8766.63 8683.75
10038.13 8789.71 8706.83
42 50 S 32.23 W 2.11 3282.02S 773.80W
41 58 S 32.97 W 1.07 3335.10S 807.74W
41 41 S 34.21 W .94 3387.12S 842.29W
41 16 S 33.34 W 1.84 3408.31S 856.46W
41 51 S 34.79 W 3.64 3425.27S 867.93W
3361.87
3422.75
3482.82
3507.32
3526.96
10069.82 8812.92 8730.04
10100.69 8834.67 8751.79
10131.56 8855.34 8772.46
10162.60 8874.76 8791.88
10193.56 8892.42 8809.54
43 56 S 33.06 W 7.54 3443.17S 879.96W
46 29 S 29.92 W 10.97 3461.85S 891.39W
49 24 S 28.07 W 10.45 3481.90S 902.49W
53 5 S 26.84 W 12.28 3503.38S 913.65W
57 20 S 26.20 W 13.83 3526.13S 925.00W
3547.67
3568.95
3591.43
3615.28
3640.41
10224.62 8908.27 8825.39
10255.28 8922.07 8839.19
10287.03 8934.39 8851.51
10318.74 8944.98 8862.10
10350.27 8953.79 8870.91
61 15 S 25.91 W 12.58 3550.12S 936.72W
65 15 S 25.51 W 13.13 3574.79S 948.60W
69 3 S 25.72 W 11.95 3601.17S 961.24W
71 56 S 25.69 W 9.15 3628.10S 974.21W
75 34 S 26.02 W 11.56 3655.33S 987.41W
3666.83
3693.94
3722.91
3752.51
3782.47
10381.23 8960.65 8877.77
10412.89 8965.79 8882.91
10443.80 8969.52 8886.64
10474.63 8972.74 8889.86
10506.09 8975.75 8892.87
78 48 S 26.70 W 10.65 3682.38S 1000.81W
82 31 S 27.13 W 11.79 3710.23S 1014.95W
83 37 S 27.26 W 3.58 3737.52S 1028.97W
84 22 S 26.53 W 3.39 3764.87S 1042.84W
84 39 S 26.21 W 1.37 3792.92S 1056.75W
3812.31
3843.15
3873.41
3903.68
3934.63
10558.85 8980.53 8897.65
10589.63 8983.23 8900.35
10620.60 8985.65 8902.77
10652.39 8987.21 8904.33
10683.99 8987.58 8904.70
84 56 S 27.14 W 1.83 3839.87S 1080.34W
84 59 S 25.73 W 4.57 3867.33S 1093.99W
86 3 S 27.52 W 6.70 3894.92S 1107.82W
88 19 S 29.31 W 9.11 3922.84S 1122.93W
90 18 S 28.66 W 6.59 3950.48S 1138.24W
3986.53
4016.84
4047.33
4078.53
4109.51
10714.92 8986.98 8904.10
10745.96 8985.67 8902.79
10776.77 8984.22 8901.34
10807.79 8983.35 8900.47
10839.71 8984.23 8901.35
91 54 S 31.12 W 9.49 3977.29S 1153
92 55 S 30.69 W 3.57 4003.90S 1169
92 28 S 30.15 W 2.30 4030.43S 1185
90 44 S 29.77 W 5.71 4057.30S 1200
86 6 S 26.44 W 17.86 4085.43S 1215
.65W
· 58W
.16W
· 64W
.67W
4139.74
4169.93
4199.95
4230.25
4261.62
SPF?~Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 2
SHARED SERVICES DRILLING
PBU/Y-14A
500292183201
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/30/95
DATE OF SURVEY: 102895
MWD SURVEY
JOB NUMBER: AK-MM-951054
KELLY BUSHING ELEV. = 82.88 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
10869.41 8987.07 8904.19 82 54 S 28.16 W 12.25 4111.70S 1229.22W
10900.17 8990.83 8907.95 83 4 S 27.81 W 1.26 4138.66S 1243.55W
10931.26 8993.90 8911.02 85 35 S 26.19 W 9.62 4166.22S 1257.59W
10962.60 8995.50 8912.62 88 33 S 25.37 W 9.80 4194.40S 1271.20W
10993.51 8996.03 8913.15 89 30 S 26.95 W 5.98 4222.14S 1284.83W
4290.77
4320.81
4351.33
4382.32
4412.89
11024.37 8996.04 8913.16 90 25 S 27.58 W 3.61 4249.57S 1298.96W
11043.55 8995.87 8912.99 90 35 S 28.83 W 6.57 4266.47S 1308.03W
11074.64 8995.52 8912.64 90 42 S 28.75 W .46 4293.71S 1323.00W
11105.42 8995.30 8912.42 90 5 S 29.37 W 2.85 4320.62S 1337.95W
11136.17 8995.76 8912.88 88 12 S 27.56 W 8.49 4347.64S 1352.60W
4443.32
4462.17
4492.68
4522.86
4553.06
11167.19 8996.76 8913.88 88 5 S 26.57 W 3.21 4375.25S 1366.71W
11198.90 8997.72 8914.84 88 25 S 25.90 W 2.37 4403.68S 1380.72W
11230.60 8998.41 8915.53 89 6 S 27.99 W 6.93 4431.93S 1395.08W
11245.77 8998.64 8915.76 89 4 S 26.63 W 8.97 4445.40S 1402.04W
11300.00 8999.52 8916.64 89 4 S 26.63 W .00 4493.88S 1426.34W
4583.65
4615.00
4646.27
4661.23
4714.80
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 4714.80 FEET
AT SOUTH 17 DEG. 36 MIN. WEST AT MD = 11300
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 197.71 DEG.
TIE IN POINT 9403.08'
WINDOW POINT 9416'
INTERPOLATED DEPTH 11300'
SPF~-'Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBU/Y-14A
5oo2921832o1
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/30/95
DATE OF SURVEY: 102895
JOB NUMBER: AK-MM-951054
KELLY BUSHING ELEV. = 82.88
OPERATOR: B~P EXPLORATION
FT.
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
9403.08 8309.56 8226.68 3068.50 S 657.71 W 1093.52
10403.08 8964.41 8881.53 3701.58 S 1010.53 W 1438.67 345.15
11300.00 8999.52 8916.64 4493.88 S 1426.34 W 2300.48 861.82
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SPF~--~Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
SHARED SERVICES DRILLING
PBO/Y-14A
5oo2921832o1
NORTH SLOPE BOROUGH
COMPUTATION DATE: 10/30/95
DATE OF SURVEY: 102895
JOB NUMBER: AK-MM-951054
KELLY BUSHING ELEV. = 82.88 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
9403.08 8309.56 8226.68 3068.50 S 657.71 W 1093.52
9493.78 8382.88 8300.00 3117.06 S 679.87 W 1110.90 17.38
9622.64 8482.88 8400.00 3188.46 S 718.56 W 1139.76 28.86
9759.66 8582.88 8500.00 3269.32 S 765.79 W 1176.78 37.02
9895.13 8682.88 8600.00 3346.31 S 815.01 W 1212.25 35.47
10028.96 8782.88 8700.00 3420.24 S 864.44 W 1246.08 33.83
10176.57 8882.88 8800.00 3513.55 S 918.74 W 1293.69 47.61
10585.61 8982.88 8900.00 3863.72 S 1092.25 W 1602.73 309.04
10623.08 8985.82 8902.94 3897.11 S 1108.97 W 1637.26 34.54
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
TONY KNOWLES, GOVERNOR
ALASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
September 21, 1995
Terry Jordan, Senior Drilling Engineer
BP Exploration (Alaska), Inc.
P O Box 196612
Anchorage, AK 99519-6612
Re:
Prudhoe Bay Unit Y-14A
BP Exploration (Alaska), Inc.
Permit No 95-147
Surf Loc 4788'NSL, 4574'WEL, Sec. 34, T11 N, R13E, UM
Btmhole Loc 397'NSL, 696'WEL, Sec. 33, T11 N, R13E, UM
Dear Mr. Jordan:
Enclosed is the approved application for permit to drill the above referenced well.
The permit to drill does not exempt.you from obtaining additional permits required by law from other
governmental agencies, and does not authorize conducting drilling operations until all other required
permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient
notice (approximately 24 hours) of the BOPE test performed before ddlling below the surface casing
shoe must be given so that a representative of the Commission may witness the test. Notice may be
Id inspector 659-3607.
David WT~'tlsto n
Chairman
BY ORDER OF THE COMMISSION
/encl
c: Dept of Fish & Game, Habitat Section - w/o encl
Dept of Environmental Conservation - w/o encl
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work Drill [] Redr, ll FIIlb. Type of well. 'E"~'1o~;i;7371-1 Stratigraphi. c Test [] Development Oil []
· Re-Entry [] DeepenE!I Service [] Development Gas [] SingleZone [] Multiple Zone[]
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration 85 feet Prudhoe Bay Field/Prudhoe
3. Address .6. Property Designation Bay Pool
P. O. Box 196612. Anchoraae. Alaska 99519-6612 ADL 0£~2~7
4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 ,~c 2s.o25)
4788' NSL, 4574' WEL, SEC. 34, T11N, R13E Prudhoe Bay Unit
At top of productive interval 8. Well number Number
'1188' NSL, 258' WEL, SEC. 33, T11N, R13E Y-14A 2S100302630-277
At total depth 9. Approximate spud date Amount
397' NSL, 696' WEL, SEC. 33, T11N, R13E 09/25/95 $200,000.00
12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth(uDand'rVD)
property line
ADL047471 397 feet' NoCloseApproach feet 2560 11205'MD/8965'TVD feet
16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2))
Kickoff depth 94~o feet Maximum hole angle 8~.7 o Maximum surface 3330 psig At total depth ('I'VD) 8800'/4390 psig
18. Casing program Setting Depth
s~ze Specifications
Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Leng~th MD TVD MD TVD (include stage data)
8-1/2" 7" 29# L-80 Butt 1005' 9450' 8348' 10455' 8965' 274 sx Class 'G'
6" 4-1/2" 12.6# L-80 Butt 2373' 10455' 8965' 11205' 8981'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet" Plugs (measured)
true ~ertical feet
Effective depth: m, easured feet Junk (measured)
true vertical feet
Casing Length Size ., Cemented Measured depth True Vertical depth
Structural
Conductor .,-
Surface RE,.ciVED
Intermediate
Production SEP 1 8 1995
Liner
Perforation depth: measured Ataska (Jll & Gas Cons. C0mmJssJ0n
true vertical
20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[]
Drilling fluid program [] Time vs depth plot [] Refraction analysis[] Seabed reportl-1 20 AAC 25.050 requirementsl-1
21. ! hereby certify that the ~rego[ng is true and correct to the best of my knowledge
"'?~. '/~ -Title Senior Drilling Engineer Date /~-/'-
Signed
5P01 Commission Only
Use
P erm~r~.....iANu m ber/,~¢ ~ I° v..al date I See cover letter
,~/'-- ¢5'-' Ifor other requirements
Conditions of approval Samples required [] Yes [] No Mud log required []Yes [] No
Hydrogen sulfide measures [] Yes [] No Directional survey required [] Yes [] No
Required working pressure for BOPE I-]2M; []3M; []5M; 1-110M; I-I15M;
Other: Original Signed By by order of /
Approved by David W. Johnston Commissioner [ne commission Date
Form 10-4nl Re,/ 10_-~_¢~c///~ /
Submit id 151icate
I Well Name: I Y-14A
Redrill Plan Summary
IType of Redrill (producer or
injector):
PRODUCER
Surface 492 FNL & 706 FWL, Sec. 34, T11N/R13E
Location:
Target Location: 1188' FSL & 258' FEL, Sec 33, T11 N/R13E
Bottom Hole -- 397' FSL & 696 FEL, Sec 33, T11N/R13E
Location:
AFE
Number:
4P0721
IRig: I
DOYON RIG #14
Estimated Start 9/25/95
Date:
Operating days to
complete:
25
IMD: 1~205' I
I TVD' 18965'
IKBE: 185.45 I
Well Design (conventional,
slimhole, etc.):
HORIZONTAL SIDETRACK
I Objective:
I SADLEROCHIT
ABNORMAL PRESSURE
Special design
considerations
NONE. NO ABNORMAL PRESSURE ANTICIPATED.
RESERVOIR PRESSURE HIGHLY CONSISTENT IN "Y"
PAD AREA AT 3500 PSI
SEP 1 8 1995
0il & Gas Cons. Commission
Anchorage
Y-14A Redrill Plan Summary Page 1
Mud Program:
An 10.0-10.2 ppg mud will be used for the 8 1/2" intermediate hole and 9.0 ppg
will be used on the 6" production hole.
Special design I~
considerations
Depth Densi PV YP INT 10MIN FL OIL SOLID
(TVD) ty (CP) (#/FT GEL GEL cc/30 (%) S
(PPG) ) min (%)
KOP' 10.0 10 15 5 10 5 0 5
to to to to to to to to to
10455 10.1 18. 30 15 30 7 0 10
Depth Densi PV YP INT 10MIN FL OIL SOLID
(TVD) ty (CP) (#/FT GEL GEL cc/30 (%) S
(PPG) ) min (%)
10455 9.0 10 45 5 10 5 0 5
to to to to to to to to to
11205 9.1 15 50 15 30 7 0 10
Directional:
I KOP= 19450
Maximum Hole
Angle:
Close Approach
Well:
88.7°
The above listed wells will be secured during the close approach.
SEP 12 1995
Casinq/Tubinq Proqram: ~)i[ & Gas Cons. Commission
Hole Csg/ Wt/Ft Grade Conn Length Top -Btm
Size Tbg O.D. MDrrVD MDFrVD
8.5" 7" 29.0 L-80 butt 1005 9450/8348 10455/8965
6" 4 1/2" 12.6 L-80 butt 2373 10455/8965 11205/8981
Y-14A Redrill Plan Summary Page 2
Cement Calculations:
Liner 7" 29#, L-80,NSCC
Size:
Basis: 50% open hole excess, 80' shoe joint, 150' liner lap (9 5/8"), and
200' excess above liner top.
Total Cement 571 274sxs of Class G Blend @ 1.17 ft3/sx
Volume: Bbls
I
Liner
Size:
4 1/2", 12.6#, L-80, NSCT
Basis:
excess above liner top.
50% open hole excess, 80' shoe joint, 150' liner lap and 200'
Total Cement
Volume:
125 Sx of Class "G" Blend @ 1.17 ft3/sx
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and
annular preventer will be installed and is capable of handling maximum
potential surface pressures.
Diverter, BOPE and mud fluid system schematics on file with AOGCC.
Hazards and Contingencies
Mud weights should be kept to a minimum while drilling through the horizontal
section (+_9.0 ppg) to prevent differential sticking. With 9.0 ppg the hydrostatic
is +_4195 psi which is well over the formation pressure of +_3675 psi.
.,
SEP ~ ~ ~995
Gas Cons. Commission
Anchorage
Y-14A Redrill Plan Summary Page 3
o
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
SUMMARY PROCEDURE
1. Pre-Rig Work: RU slickline. RIH and ensure the sliding sleeve at 9657' is closed. RU
cementers and tie directly into tree down the production tubing, mix and pump 25 bbls of Class
"G" and displace with 85 bbls of seawater (top of cement @ _+9800'), POOH, RU wireline, RIH
with jet cutter and tag top of cement with AOGCC representative present (top of cement must be
above 9952'), then jet cut 4 1/2" production tubing at _+9665', POOH, freeze protect, install
BPV, RDMO.
2. Move in drilling rig.
3. Pull BPV. Circulate diesel freeze protection cap from well and recover for future use.
4. Install a TWO valve. Remove the production tree.
5. Install BOP's and test to 5000 psi. Remove the TWC valve.
6. Pull and lay down the 4 1/2", 12.6#, L-80, BUTT tubing, RU wireline,
7. PU 9 5/8" section mill, RIH to 9600', spot heavy mud to 9500', pull section mill to 9450'.
8. Displace well to FLO-PRO/milling fluid. Cut a 50' section in the 9 5/8" casing starting
from about 9450'-9500' MD. POOH
RIH with open ended drill pipe to 9600' and lay a cement plug back to 9250', POOH.
Run in with a 6 3/4" steerable drilling assembly and a 8 1/2" bit with gamma
ray/directional MWD. Contact AOGCC to witness tag of cement for abandonment purposes.
Dress the cement to 5' below the section top. Kickoff and if necessary displace well to clean
FLO-PRO system. Continue to directionally drill to the 7" casing point at _+10455' at 88.7°
(see attached directional plan).
Make a conditioning trip with an 8 1/2" hole-opener for the open hole section Install a 7",
29#, L-80, BUTT Solid liner with 7" X 9-5/8" packer/hanger. Packer / hanger to be set
at _+9300' MD.
Cement the liner in place with the total cement volume based upon 50 % open-hole
enlargement plus the 80' shoe volume, 9-5/8 X 7" lap volume, and 150' excess on top of
the liner with drillpipe in the hole.
Re-test BOP's as needed.
PU 3 1/2" drill pipe and 4 3/4" steerable drilling assembly with gama ray and directional
MWD. RIH and cleanout liner to landing collar, test casing to 3500 psi.
Drill out shoe and continue to drill horizontally to 11205' MDTD.
Install a 4 1/2",12.6#,L-80,BUTT slotted liner with 4 1/2" X 7" hanger/packer. The
liner hanger is to be at _+10305'.
There exists a possibilty that the liner will be run with two ECP,s as dictated by geology.
Run the 4-1/2" L-80 completion string assembly using as much 4-1/2" used tubing and
jewelry as possible. Space out and circulate with corrosion inhibitor.
Install a BPV and test plug. Remove BOP's.
Install and test the production tree to 5000 psi. Pull tree test plug and BPV.
Set packer.
Test the tubing x casing annulus to 3500 psi for 30 minutes.
Shear RP valve in the upper GLM and freeze protect the well.
Set a BPV. Release rig.
Complete appropriate documentation and hand-over to Production.
SEP 995
Gas Cons. Commission
Anchorage
Y-14A Redrill Plan Summary Page 4
I
TREE: 4" CIW Y 14A Planning KBE = 89,0' (Nabors 28E)
WELLHEAD: FMC .. BF-MSL = 51.91'
Sidetrack out of 9 5/8" Casing
t OTIS
SSSV Landing Nipple GAS LIFT MANDRELS
~ Z O ~- ~, .+.2200' (W/1" BK LATCHES)
13-3/8" = NO MD ! TVD(RKB)
72 #/ft 1 80' "Above liner lap
L-80 BTC Production Tubing 2 i 7,250'
4-1/2" 12.6#/ft L-80 NSCT ' 3 6700'
j i 4 5900'
,
--" 5 4750'
STANDARD 'X/X/XN' Completion 6 3000'
~ ' 1 I 7"x9-5/8" Hanger/Packer
~ r ~ ~ Set ±150' from top of window @ +_ 9,850' md
!~!~ [ ~ Sidetrack KOP @ + 9,950' md
~ilI ~ ~ Window cut @ 10,000' - 10,050' md
?~, ,:~. 4-1/2 Slotted Lmner Runmng Order
~t~ ~ i ~ Note: Run TIW SS Packer (6')
~ ~ ~. Blank joint of liner (40')
~, % ~;~. 2' CTC Profile Sub (2') (** may not be needed)
~ ~ ~ ~ Ported Nipple Joint (40')
~ ~~Slotted1 SIottedDner. Joint tot°TDCS g shoe (40)
i ~ ~,~ ~ Set liner top @ + 130' from 5-1/2" casing shoe
~.-
~i 4-1/2" x 7" Packer
~ i ~ ~ - . Set @ d: 10,730' (WLEG at least 50' above Top Sag or at 60°)
@9250' md ~.'~ ~T~. Set @ + 10,374' md at 89.6° inclination
3-1/2" X~Packer 9-5/8"
~-~- I,~;.~ I Estimated TOC @ 9,750' md~' TD @ 11232' MD
7" Liner Top '~, ~ ~' 9-5/8" 47 #/ft L-80 BTRS CTC ECP Assembly
~ ~ (2 are planned)
~ Setting Depth TBD @ TD
~ : Perforations Summary
~ I Size SPF Interval Open/Sclz'd
' 5 6 ~ 0,174'-10198' ! Sqz Re per[
2.2 5 10,198'-10,210' Sqz'd
2.2 6 11,380'-11,520 Sqz Re per[
Z ~ ~ PBTD 10,445' MD
__.,... 7' 26#/ft L-80 Liner
/lO,487'MD I
DATE REV. BY COMMENTS PRUDHOE BAY UNIT
5/15/95 DMS PROPOSED SIDETRACK COMPLETION WELL: Y-14a
APl NO: 50-029--218332-00
SEC 33; T11N; R13E
BP EXPLORATION
GAS LIFT MANDRELS
(WI 1" BK LATCHES)
NO MD TVD(RKB)
80' Above liner lap
7,250'
6700'
5900'
4750'
3000'
EP 1 2 1995
Gas Cons. Commission
Anchorage
.~iPM ~ HF~_/ISURTON DRILLING
4. ~e~vice~ .Onillln~-'
. cate PLane: Zone4
~/F1A: Y-Pad
~' ~TON
looo
5000
o
SCALE ,503 Pt. / I)IVISIEN 1~' ~ ~
3149 ~1 8 ~ ~
~'845 ~
VERTICAL SECTICN PLANE~ 197~3
S EP 12 1995
Gas Cons. Commission
Anchorage
~5
8975
8975
NS E'~ G~;d X ~cl Y
,T~CO S g57
4391 S
~ $ 1619 6' C-4,3<)54 ~120
4555 $ 676 ~' 644915 59~52.10
TVD Bc~31.40
H~ 11805.47
N/S 4,358,L:~
EA,/ 1;384.73
$'£P 'l 2 995
Alaska 0il & Gas Cons. Commission
Anchorage
Sun'ey Rrf~c'e: WELLHEAD
Refe~noe World ~[nst~: ~t. 70.16.13 N - ~D 148,49.24 W
Rcr~n~ GRID ~: ~ S~ Pla~ ~,e: ~a 4
Rcf~e GRID C~i~ ~ S9497~.00 N 645~3.00 ~
N~h ~i~d To: ~UE NOR~
Cl~c R~: WEL~E~
~ Rcf~n~
Halliburton Energy Services - Drilling Syslems PSL
Proposal Rcporl
IF;N-C.4DDS REFZ I.B
197.63
Page I
Da~c:
Time: 2:35 pm
Wellpad't ID: Y-I 4A1Vp2
~ Revision: 7/6/95
BPX.-Shared Serv~ce~ Drilling
Alaska Stale Plane: Zorn:4
PBU: WOA: Y-Pad
¥-14A
Y-14A Wp2 Ptelirr~ twllp~
GRID Coordbutts Clesum Vtrti~l Build Walk DLS Cam. E,.xp~ed Total Max Her Mitt Ha Dir.
NoNhing EaL~ng Dist. Dig. Sect[on Rate Rale Dogleg Rec~ngularCoords Erter Errs' l~faXEn' Efta'
(fl) (a) (It) (d~,.) (fl) (4~t0oa) Cs, to0a) (rig/teaR) tar-r,) (a) (a) (S) (a)
gun, v/Toot
0.O0 0.00 0.00 -85.3:5 0.00 0.00 O.OON 0.00 E 5949777.00 645503.00 O.O~ 0.00 0,00 0.00 O.00 0.O0 O.O 0.00N 0,00 E 0.00 0.00 0.00 0.00 MWD
105.55 0.17 247.5:~ 20.20 105.55 IOI:55 O.065 O. 14W 59497?6.94 645502.86 0.1(~R47.-45 0.10 0.16 O.O0 0.16 0.2 0.06S O.14W 2.00 2.00 337.55 0.0:5 BPHG-PDD
205.55 0.-12 230.42 120.20 205.55 IO0.00 0.25S 0.50~V 5949776.7064550231 0.$1~9..3~ 0.43 0.15 -17.13 OAT 0.3 0.298 0.50~V 2.07 2.07 321..91 0.30 BPHG-PBD
305-55 0.38 232.37 220.20 305.55 I00.00 0.678 0.9"AV 5949776.31 645502.04 !.!9~2.15..11 0.94 0.06 1.95 0.06 O.4 0.678 0.97W 2.22 2.22 322.24 035 DPH~PBD
~5.S5 0.30 210.78 320~0 405J5 I~.00 IAOS 13~ 5949775.87645~01.65 I.~1~i !.47 ~.08 -21-59 O.l~ O.~ I.lOS 13~V 2.44 2-~ 314.~ 0.~ BPHO-PBO
~05,55 0.20 229.05 4lO.19 50154 IO0.00 l.~S 1.6~V 5949775.53 645501.39 ~1~.64 1.17 ~.10 18~7 0.13 03 1.44S 1.~ 2.71 Z71 316.63 1.05 BPH~PBD
605,55 035 124.80 520.19 605.54 IO0.00 1.83 S 1.3~V 5949775,1:5 645501.66 Z2~l&gr2 2,16 0.35 -1~.23 0.~ [3 1.83 8 13~V 3,03 3.03 3~.~ 130 BPH~PBD
705,53 1.58 99.13 620.17 q05J2 I00.~ 232S 0.381 5949774.69 645503.42 ~l~.~ 2.10 1.03 -~.67 IAI Z4 2.32S 0381 3J7 336 1.~ I J5 BPH~PBD
805.~5 2.17 92.2~ ~.12 805.47 IO0.00 2.62S 3.631 5949774.46 ~506.68 ~1~.75 1=19 0-59 ~.88 0.~ 3.0 2.62S 3.~E 3.73 3.~ 359.8~ l.~ BPli~PBD
905.55 3.8.1 101.03 819.98 90533 IO0.00 3__33S 8.801 5949773.84 645511.87 9.4~110.71 0.51 !.66 g.78 I.T~ 4.8 333-q 8.8~01 4.11 4.09 7.45 2.0~ BPHG-?BD
1005.:55 4.O7 102.93 919.74 1005.09 IO0.00 4.76 S 13.34 E 5949772.54 645518.63 16,2~107.04 ,O. 17 0.24 1.90 0.27 5,0 4.76 S 15.54 E 4.~0 4.48 9.21 2.12 BBHG-?BD
!105,5~ 3.63 101.~0 1019.52 1104.87 lO0.00 6.205 22.121 5949771.23 645525.23 22.97~105,65 ,0.79 -0.42 -t J3 0,43 5.:~ 6.20S 22,12£ 4.90 4.87 8.84 2.56 BPHG-PBD
1205.55 3.02 101.27 I 119.35 1204.70 lO0.00 715 S 27.8'2 E 5949770.19 64553035 20.T/~IO4~O -!,42 -0.63 -033 O.6~ ~.I 7.35 g 27.82 E 5.31 5.28 1.82 2.81 BPHO-?BD
1305.55 2.82 ~9.0:5 1219.22 1304.57 IO0.00 1.25.q 32.~ F. 5949769.39 645:533.98 33.8.~104.11 -2.08 -0.20 -2.22 0.2.1 6.3 8.25 $ 32.83 E 5,72 5.68 8.42 3.0~ BPHG-?BD
1405.55 2.32 89,12 1319A2 1404.47 IO0.00 a.61 S 37.28E 594976~.12 645540.44 3~103.OO -3.09 -0.50 -9.93 0.67 7.0 8.61 S 37.281 6,13 6.10 6,4'7 3..31 BPHG-PBD
1505,~5 !.97 83.53 1419.05 1504.40 I00.00 8.38 S 41.021 5949769,41 645544.17 41.Rei~lOIJ5 -4.43 -035 -5.59 0.41 7.4 838S 41.02E 6.55 6.51 5..12 335 BPHO-?BD
1605,33 !.63 84,35 1519.00 1604.35 IO0.00 I.O3 $ 44.14 E 5~49769.81 645:547.28 44.8'~0034 -5.~9 -0-34 0,82 0"34 7,7 8.05 S 44.14 E 6.97 6.93 5.02 3.80 BPHG-PBD
1703,:55 I.I 8 86,70 1618,97 170432 100.043 7.8:5 S 46.58 £ 5949770.05 645549.72 47.24~ 9~37 -6.62 -0.45 2.3:5 0.4:~ 1.2 7.8~ $ 4&58 E 739 735 :5.0~ 4.05 BPHG-PBD
1805.55 I.O2 85=10 1718.95 180430 100.00 7.7ZS 48.50E 5949770.22 645:551.53 49.11~ 'J9,04 -733 ~.16 -l.~ 0,16 ~4 7.~S 4~501 7,81 7.~ 4.7~ 4.30 BPHO-P~
1905.55 0.~ 87.78 1818.93 l~2g 100.~ 7.51 S 50.20 E 594~70,36 6435~333 ~.~ ~,63 -7.94 ~.09 2.48 0.10 1.5 7.61 S 50.20 E [~ 8.19 4.~ ~5 BPHG-PBD
2~3,~5 0.6~ 103,25 1918.92 2~27 100.~ 7.71S 51361 ~9497~.29 645554.69 $~1~ 98.51 ~.26 ~.28 15,47 035 1.8 731 ~ 5I~E 8.~ 8~2 5.~ 4.80 BPH~P~
2105.5:5 0.63 !14=15 2018.92 2104.27 100.00 8.07S 52.61E :5949769.95 645355.75 -$3.23~ 9172 -I.24 ~0.02 11,10 0.I3 0.9 8.078 52.61E 9.08 9.04 5.38 :5.05 BPHG~BD
2205.55 0.65 i 17.08 2118.91 2204.26 100.00 13:5 S 53.62 E 5949769.49 645:5:~6.77 $4-30~ 9e~.06 -1.08 0.02 2.73 0.04 9.0 835 g 33.62 E 931 9.47 6.05 5.30 BPHG-?BD
2305,55 0.60 i 1938 2218.90 2304.23 lO0.00 9.07 S 54.58 E 5949768.99 645557.74 $3.33~ 99.43 -7.88 -0.05 2.30 0,0~ 9.0 9.07 S $4.38 E 9,93 9.89 6.45 5.:55 BPHO-FBD
2405.53 0.50 131.98 2318.90 2404.25 100.00 9.62 S 55.36 E 594976~.46 645558.33 36.19~ 99.86 .7.60 -0.10 12.60 0.16 9.2 9.62 $ 53.36E 10.36 10.32 6.94 I80 BPHO-PBD
Gas Cons. Commission
Anchorage
Halliburton Energy Services - Drilling Sysgems PSL
Prmltosal Report
Page
%¥ellp,,th ID: Y- 14AWp2
Measured Incl Drift Subscm TVD Cour~c T O T A L GRID Caordinales Cl~ure ¥a. lkal Build Walk DIS C~m. Exlx~ed Total &bi Hi- &lin Hot Dh'. Vet~ gmwey Tool
D~th Dh'. Depth Length Re;'tang~larOlfs~s Not~l~ng Easling Did. Dir. ~tio~ Rate Rate Dogleg RectmgularCoonls Enm- Error MnxE~
(Il) (c~g.) (~) (n) (Ii) (ii) (a) (~L) (n) (a) (0.) (de~) ~) (d5/1001~) (dgtmoon) (dg/lOOfl) (dcg) (ti) (t~) (ti) (11) (d¢~) (n)
2505.55 0.62 129.03 2418.90 2504.25 t00.00 10.25S 5~.IOE 5949767.84645559.29 57.0~i'~100-15 -7.22 0.12 =2.95 0.12 9.3 10.258 56.10E 10.79 10.75 7.63 6.05 BPHCr-PBD
~60X)5 0.57 120.02 2~18.89 2604.24 100.00 10-845 $6.%£ $949767.27645560.15 57.91~100.78 -~.92 -0.05 -9.01 O. 1l 9.4 t0.g4S 56.96E 11.22 11.18 7.87 6.30 BPHO.PBI)
2705.55 0.47 1:!0.30 2618.89 2704.24 100.O0 11353 57.70E $949766.77645560.90 58.81~101.13 .6.65 -0. i0 t0.28 0.14 9.:S It..lSS 87.70E 11.64 11.61 e.i5 6.55
2805.55 0.42 130.18 2718.88 2804.23 100-00 11.86S $IL~9£ 5949766.28645~61.$1 59.49{~101.50 -&..35 -4}.05 -0.12 0.05 9.6 t1.86S 58.29E 12.07 12.04 8.57 6.80 BPHC--PBD
2905.55 0.47 149.30 2818.88 2904.23 100.00 12.45 S 51LT~E 5949765.70 645562.01 60.08~101.95 -$.94 0.05 19.12 0.16 9.8 12.45 $ 38.78 E 12.50 12.47 9.25 7.05 BPHG-PBD
3005.55 0.50 157.03 2918.88 3004.23 100.00 13.205 59.16E $949764.95645562.40 60.62~102.58 -$33 0.03 7.73 0.07 9.8 13.208 59.16E 12.93 12.90 9.95 7..10 BPHG-PBD
3105.55 0.58 155.78 3018.87 3104.22 100.O0 14.065 59.54E 5949764.09645562.79 61.18~103.29 -4.63 0.08 -I.25 0.08 9.9 14.04S 59-54E 13.36 13.33 10.87 7..$5 BPHG-PBD
3205.5~ 0.f,O 161.50 31t8.87 3204.22 I00.00 15.02S 59.91E 5949763.1464~563.19 61.7~I~t04.07 -3.83 0.02 ~.72 9.06 !0.0 15.028 $9.91E 13.80 13.76 11.70 7.80 BPHG-PBD
3305.55 0.65 165.35 3218.86 3304.21 I00.00 16-075 60.22E $949762.10645563.52 62.33~104.94 -2.92 0.05 3.85 0.07 10.0 16.078 60.22E 14.23 14A9 12.69 8.05 BPHG-PnD
3405.55 0.$7 177.13 3318.8& 3404.21 lO0.00 17.11 $ ~0.39E 5949761.06 645563.?0 62.778..ii}105.82 -1.98 -O.08 il.78 0.15 10.2 17.11 s 60.39E 14.65 14.63 13.23 S.30 BPHC,-PBD
3505.5S 0.SS tS5.45 3418.8.5 3504.20 1O0.0O 18.095 60.37E 5949760.0964S563.70 63.02~t06.08 -LO4 -0.02 8.32 o.es 10.3 Ig.09S (;0.37£ 15.09 I$.06 13.91 8.55 BI*HO-PBD
3605.55 0.57 187.90 3518.85 3604.20 III0.00 m9.068 60.26E 59497~9.11645563.61 63.20f'~07.55 .41.08 0-02 2.45 0.0:} 103 19.0~s 60.26E 15.52 1~$.49 14.7{; 8.80 BPHC,-PBD
3705.55 0.47 187.88 3618.84 37o4.19 l~)O.00 19.96S 60.13E 5949738.21645563.5'0 63.36"~108.36 0.~1 -0.10 -0.02 0.10 10.4 19.968 60.13£ 15.95 1:$.92 15.43 9.05 Bt~HC,-PBO
3805..$5 0..52 185.42 3718.84 31104.19 lO0.00 20.81 S 60.03 E 59'49757.35 645.563.42 63-540:109. m2 1.~,~ 0.05 -2.46 0.0.~ 10.4 2O.ml g 60.03 E t6.39 16.36 1632 930 ePHO.I'BD
3905.58 0.53 186.33 3818.83 3904.18 100.00 21.733 59.94E 59497~.44645563.34 63.7~t~...109.92 7..56 0.0t 0.91 0.Ol t0.$ 21.73S 59.94E 16.82 16.79 17.13 9.55 EIPHG.PBD
40~5.55 1.28 185.93 3918.82 4004.17 100.O0 23"30~ 59.77E 5949754.87645563.21 64.15~111.29 4.10 0.75 .0.40 0.75 11.2 ' 23"308 59.77E 17.25 17.22 20.90 9.80 BPIIo.?eo
4105.55 4.~0 177.23 4018.67 4104.02 100.00 28.415 59.85E 5949749.75645563"38 66-25'~11~.40 g.96 3.32 ..B.70 3.34 14.6 28.415 59.85E 17.67 17.62 70.79 I0.14 BI*HG.I~BD
4205.55 8.65 179.10 4117.~9 4203.34 100.00 39.945 ¢0.16E 5949738.23445563.92 72.21~123.50 19.85 4.05 1.87 4.06 18.6 39.948 60.161: tS. il 17.91 o.')m 10.64 BPHO-I, Bo
4305.55 12.87 181.87 4216.21 4301.56 I00.00 58.605 59.9ZE 5949719.57645564.03 83.gm~m34.16 37.71 4.22 2.77 4_2~ 22.9 5~.605 ~9.92E t8.55 18.09 98.70 !1.31
4405.55 16.17 181.75 4313.00 439835 100.00 ~3.668 $9.13E 5949694_51 645563.73 102.44~144.75 61.83 3.30 .0.12 330 26.2 83.66S 59.13E 19.01 18.24 89.06 !t.99 BPHO-PBO
4305.55 18.97 183.58 4408"33 4493.68 t00.00 113.805 _~7.69E 5949664.34645562.87 127.59~153.1:Z 90.99 2.g0 1.8:) 2.85 29.0 113.805 57.69E t9.49 18.38 271.01 12.67 BPHG-PBD
4605.55 22.33 185.27 4501.89 4587.24 100.00 148.928 54.~3E 5949629.15 645560.79 158.76~159.'7~ 125..33 3.36 1.69 3.41 32.4 148.955 54.93E 19.99 1839 272.84 13.51 BPHO-PBD
4705,25 25.12 185,07 4:$93.43 4678.78 t00.O0 Isg.02S 5t_31E 5949:189.026455.T7.95 195.8((-a,.~164-81 164.61 2.79 -0.20 2.79 35.2 189,025 51.3rE 20.52 18.40 272.77 14.31 BPHO-I'eO
450:S.5.~ 28.07 18~.:~3 4~82.84 4765.19 t00,00 233.~95 47. t6£ 5949544-186455';4.66 238"30~1~8.$~ 2o8..14 2.95 0.4~ 2.96 38.2 233,595 47.16E 21.08 18.33 :Z73.31 15.19 ]3PHG.?BD
4905..55 31.97 188.10 4769.41 4854,76 100.00 283.245 41.16E 5949494.6364:1549.63 286,21~171.7'J 257.48 3.90 2.57 4.11 42.3 283.245 41.16E 2m.68 18.02 275,76 16.30 BPHO-I'BO
:1005.:55 35.98 190.28 4852.32 4937.67 100.00 338-18s 32.19E 594943934645541.72 339.9(~74.57 31:74 4.01 2.18 4.19 4~.5 33L38S 32.19E 22.35 17.55 277.81 17.49 BPHG. PBD
5105.55 38.48 192.57 493L94 5017.29 100.00 397.(;65 20.17E 5949379.84645530.85 398.1"~q,T'/.IO 377..88 2.20 2.29 2.86 49.3 397.665 20.17E 23.08 17_19 2,79.76 18.37 BPHG-?BD
52o).:I) 38.61~-' 192..55 30'10~12 3095.47-- 100,150- 458'_53'S--- 6.61 if. -5¥~9~] 1~.72 64551~1.47 4511~8~79~1'7~'4~5--045 .... 0.20-------0~O'Z' 0.2o 4~)J 458.53 S 6,61F, --23.'g&"---'IT.~;9--'Z'D~'.61 1&7~ Ut'HU-t'UO
5305.5S 38.55 192.43 5088.25 5173.60 100.00 519.46~ 6.90W 5949257.$:1642506.14 :$19.50~!80.7~ 4~7.16 -0.13 -0.10 0.14 49.7 :119.46S 6.90W 24.48 18-07 279.4~ 19.o5
540~.55 38.4~ 192.2o 51~6-51 5251.8& 100.00 580.278 20.19~V 5949196.49645494.03 580.621~181.9~ 559.14 .0.10 "0.25 0.18 49.9 511o.275 20.19W 25.:14 18.45 279.19 19=37 BPHC,-?BD
5505.:15 38.38 192.15 5244.87 5330.22 I~0.00 641.0~$ 33.29W 5949135.S2645482.11 641.87~1112.97 0'21.00 -O.07 -0.0~ 0.08 49.9 641.015 33.299/ 26.42 18.82 279.13 19.69 BPHO.?BD
560~.55 38.30 192.13 532330 5408.65 100-00 70[.668 4~.34W 5949074.63645470.24 703.18~183.78 682.75 -O.08 -0.02 0-08 50.0 70i.665 46.34W 27.32 19.20 279.12 20.01 BPHO-PBD
5705-5~ 38.:18 192.18 5401.43 5486.98 100.00 762.43 g 59.4~¥ 5949013.62 645458.32 764.74~184.4~ 744.63 o.28 0.05 0.28 50.3 762.43 ~ 59.43W 28.25 19.49 279.20 20.41 BPHG-PBD
.q805.:55 38.$0 192.08 5479.84 .$565.19 m~0-00 823.355 72.SZ~V 5948952.4764544(;.41 826,53(~185.03 ~O6.fi5 -O.08 -0.10 0.10 ~.4 823,355 72,5~v 29.21 19,~ 2~,m7 20.73 BPH~PBD
5905.35 38.~ 192.03 5557.89 5643.24 I~.O0 88~49S 85~V 5948~1.0964~3~54 888.6~185~ ~88 0.~ ~.05 0.~ 50.8 884.495 85.5~V 30.19 20.13 2~.22 2t.17 BPH~PBD
~05-55 38.~ 191.82 5635.71 $~1.06 I~.Oo 945.~8 98J~V 5948829,4164~2~75 951.0~185~ ~7 0.~ ~.21 0.13 ~.9 94S.93S 98.58V 31.19 20.~ 2~.16 21.$t B~H~PBD
6105.55 38.95 191.82 5713~t 5798.86 m~.O0 l~7.~S 111.4~ $94~67.68 645411-07 1013.~18~1 W3.87 0.0~ 0.~ 0.05 ~1.0 1~7.43 S tll.4~V 3221 20.84 2~.22 21.87 BPH~BD
~205.55 38.88 t91.67 $~1~1 5~&.~6 1~-00 1~8 12~tW ~94~05.956453~.48 1076.1~18~ 10~6.36 ~.07 ~.I~ 0.12 51.1 10~.93~ 124.21W 33.25 21.~ 2~.21 ~.i9 B~PBD
6305.55 38.92 191.62 5869.14 59~.49 100.00 1130.~S I~.~ 59486~.22645387.99 1138.&~18~ i11~.81 0.04 ~.0~ 0.05 51.1 !i30.~S 13G.~V 3430 21.~8 2~.24 2~54 BPH~PBD
~5.55 38.55 191.67 5947.~ 6~2.~ 100.00 1191.~g 149~ ~948~.~4645376-54 1201.1~i87.1~ IiSI.ti ~.27 0.05 0.27 $1.4 1191.798 149.5~V 35-15 2~02 279-11 22.81 B~O-PBD
6505.55 38.55 191.~ 6025.24 6110.59 1O0.00 1252.88S 162.1~V $94~21.32645365-07 1263~187~8 1243.17 ~.10 0.0~ 0.1~ 51.5 1~888 1~2.1~ 3&.41 22.42 279.38 23.12 B~O-PBD
(-
c
--I
o
~z
SEP '12 1995
Gas Cons. Commission
Halliburton Energy Services - Drilling Systems PSL
Proposal Report
Pase3
D~sle: 7/6/95
ID: Y-14AWp2
Ix leasured tncl Drift Subsen TVD Caum T O T A L G~D C~ C~ ~e~.l ~ild ~a~ D~ ~ ~d To~l ~l~x H~ Min H~ ~. V~
D~ Dir. ~ ~ R~l~Off~ N~g ~g ~ D~. ~i~ ~ ~ ~ R~I~& E~ E~ M~xE~
6603.55 38.78 L91.75 6103.32 6188.67 100.~ 1314.05g t74.~ 594~59.~645353.$4 132~.6~1~.5g 1305.3t 0.23 0.02 0.~ 51.8 13i4.0SS 174.S%V 37.49 22.~ 2~.~ 23.53 BPHG.PBD
6705.55 39.37 191.73 61~.95 62~.30 100.~ 137~.76S I ST.~ 594~97.97~534t.9t 13~1~1~.77 1368.02 0.59. ~.02 0.59 52.3 1375.76g 1~.7~V 3a.~ 22.91 2~.~3 24.~ BPHG-PBD
6805.55 39.~5 t91.90 62~7.99 6343.34 100.~ 1438.17S 200.~' 594~35.33645330.06 145Zl~gg.g5 ~431.~ 0.~ 0.17 ~49 52.n 143~.17g 2~.7~V 39.72 23.13 279.66 24.53 BPH~PBD
6905~5 40.45 192.03 ~34.43 64i9.78 100.~ [501.25S 214.1~ 594~272.01 ~S317.91 151~8g.12 1495.61 0.~ 0.13 0.61 53.4 ]501.25S 2~4.1~V 40.8~ 23.31 2~.78 25.~ BPHO-PBD
710~.55 4~05 19230 ~.70 6570.05 10o.~ 1630.30g 241.71W 5~814~M52~.84 164ti~Sg.43 1626.95 0.~ 0.3~ 0.76 SS.~ reredOS 24~.TtXV 4~.2~ 2~.~0 2~.02 2~.2S
7205.5~ 42.53 192.57 65~.67 6~4.02 t00.O0 I696.01S 2~6.2~' 594~076.49 ~52~.62 171~.~S~59 I693~7 0.4~ 0.27 0.~1 55.6 16~.OtS 2~.2~V ~.50 23.70 2~.!8 26.76 BPHO-PHD
7305.55 42.70 192.7g 663~7 6717.62 t00.O0 1762.07S 27~.~' 594g010.166452~.04 1~g8.95 t76L42 o, t7 0.2~ 0.22 ss.s tT~oTs 27~.0~v as.Ts ~4,~ 2~.3t 27,n
7405~5 42.~ 193.13 6705.70 6~i.05 too.oo Ig2~.22s 296.2~, 5947943,73~525~10 lgS~sg.90 ts~.os 0.~0 03s 0.2~ ~.~ ~e2~.22s 2~.2~v 47.0~ 24~3 2~.49 27,s~
7505~5 42.~ 193.~ 6779.05 6864.40 I00.00 1894.36g 301.9~~ 5947~7.31 ~5237.74 191g.2~.06 1~96.85 0.03 0.35 0.24 ~.3 lg94~68 301.9~V 4~.28 24.69 280.66 27.93 B~HO-PBD
7605.55 42.78 193.72 68~2.42 6937.77 I~.00 19~.4t S 317.~' 5947810.97 6452~.04 1986.O~.21 1964.63 .0.05 0.24 0. I7 56.5 t~.4l S 3tT.~V 49.55 25.~ 2~.79 28.27 BPH~PBD
7705.5~ 4~97 193.85 6~.70 701L05 I~.00 2026.493 334.~l~t 5947744.~ ~5208.11 205~R936 2032.52 . 049 0.13 0.21 ~.7 202~.49S 334.1t~V 50.84 25~ 2~.90 28.69 BPH~PBD
7~5~5 43.t~ 193.85 6~76 ~084.11 I~.00 2092.79~ 350.4~t 5947678.00 645193.04 2121.9~lag.St 2100.~ 0.~ 0.~ 0.~ ~.9 2092.79S 350.4~V 52.13 25.6~ 280.98 29.12 BPH~PHD
7905~5 42.70 194.08 7071.~ 7157.32 I~.00 2158.89S 366.8~ 5947611.~964~177.88 21~.~189.64 216163 -0.47 0.~ ~50 57.4 2138.89~ 366.~V 53.42 26.20 2g1.09 29.32
8005.55 42.32 194.27 7145.68 7231.03 I~.00 2224.4t~ 3~.4~V 5947545.78 645152~0 22S7.2~!89.18 2236.0g ~.38 0.19 0.~ 57.8 2224.41 ~ 3~3.4~V 54.70 26.72 281.20 29.~
8105.55 41.93 194~7 7219.85 ~05.20 I~.00 2289.~S 400.0~[t 5947480.4864~t47.27 232~0~189.91 2303.05 .0.39 0.10 0.40 58.2 22~.40g 400.0~' 55.97 27.24 2g1.28 29.76 BPH~PBD
820~.53 41.95 194.82 7294.24 ~379.59 I00.00 23~4.08~ 416.8~V 5947415.50645131.6~ 23~.~1~.04 2369.~ 0.02 0.45 0.30 5~.$ ~.08S 41~V 57.25 ~7.~ 2~1.45 30.12
8305.~5 41.38 195.25 ~68.94 745(29 I00.00 2418.28g 434.1lW 5947350.986451t5.68 2~190.18 2436.20 ~.57 0.43 0.64 ~9. t 2418~8~ 434.11W 58.50 28.21 281.61 30.27 BPH~PBD
8~.55 40.60 19~.95 7~4.42 7529.77 I00.00 2481.453 451.7RV 594~.48645~9.26 ~2Z~[~.32 2501.75 ~.78 0.70 0.91 ~0.0 2~1.45S 4~1.7~V 59.74 28.90 2~1.82 30.34 BPHO-fBD
8505.55 40.03 196.47 7520.67 7606.02 I00.00 2543.38~ 469.81~t 5947225.026450~2.~ ~.~t~.46 2566.42 ~.57 0.~2 0.~ ~.7 ~43.58g ~9.81W ~5 29.~1 281~9 30.47 ~PH~BD
S~5.55 39.83 197.77 7597~6 768~71 lO0.00 2~4.923 488.~~ 5947163.34645~4.70 26~1~.63 2630.~ ~.20 130 0.~6 61.6 260¢.92S 488.7~V 62.15 30.00 2~4 30.75 ~PH~BD
8705.55 40.07 19~.87 7674.02 ~39.37 I00.00 2~5.87~ 508.8~V 5947102.01645~5.69 271~0~1~.81 2694.81 0.24 1.10 0.75 62.3 2665.~S 50g.8~V 63.36 3032 28~68 3t.t9 aPH~PBD
8805.55 39.43 199.25 ~50.90 7836.25 I00.00 2726~1 S 529.7~V 5947~1.18645025.98 2~.3~191.00 275~ ~.~ 0.38 0.68 ~.0 2726.3lg 529.7~V ~.56 30.96 28~84 31.29 BPH~PBD
~905.5~ 38.77 1~9.77 ~28.51 7913.g6 I00.~ 2785.76g 550~V 59~8~.35645~07 2~9.6~191.18 2~1.~ ~.~ 03~ 0.74 ~.7 2785.7~S 550.~V 65.75 31.6l 2~.02 31.37 BPHO-~BD
9005.55 38.02 200.10 ~06.88 79~ I00.~ 2~.14S 5~V 59~92X576~8~ 2~1.~191~7 2883.82 ~.75 033 0.78 , ~.S 28~14g 57Z0~V ~I 3~0 2~.16 31.42 BPH~PBD
9105.55 37.65 1~.98 ~8~.86 ~71.21 100.~ ~1.77S 593.0~V 59~864.55 6~%6.11 ~1.~19135 29~.11 ~.37 ~.12 038 M.9 2901.77S 593.0~ 68.07 3Z81 2~.24 31.61 BPH~PBD
9205.~ 37.03 200.42 ~65.37 8150.72 100.~ 2958.693 613.~ 5946807.246~9q6.27 3~1.~191.72 3~5.70 ~.g2 0.~ 0.67 6~.~ ~58.69~ 613.~ 69~0 33.47 2~.40 31.69 BPHO-PBD
g40S.55 35.38 2~.08 ~226.68 ~12.03 [00.~ 3068.51g 657.71W 59~6~.61 6~4.~ 3i3~!9Z10 31~.61 ~.~ i.36 1.19 67.~ 3068JIS 6~7.7~W 71.36 34.98 2~.97 31.(6 BPH~BD
KOP/TIE ~ ! ~TER~LA~D PO~/ST~T OF ~ ~ 6.00 de~l~ ~
9450.00 35.02 203.73 8263.00 ~48~ 44.45 309~02S ~7.8~ 59466~916~4.~ 3163~19XI9 3149.10 ~.82 1.45 1.17 683 ~0ZS ~7.8~V 71.82 3532 2~10 ~1.66 BPHO-PBD
9550.00 37.21 194~4 ~43.84 ~29.19 1O0.~ 3147.655 686.8~ 59~616.936~876.~ 3~1.~192.31 3~7.~ 2.19 ~.49 6.~ 74~ 3147.78S 6~63~ ~.85 3432 2g~84 3Z86 BP~-PBD
END OF
9647.~ ~.00 l~.OO ~20.00 ~50~.35 ~7.~ 3207.38S 697.41W 5946557.01 6~7.62 32~192~7 3267.98 2.~ ~.~ ~ ~.2 3207.54g 696.6~V ~.79 33.7~ 281.42 34~3 BPHM-PBD
~T OFC~ 12.00 &fflO0 R
~9~.20 ~.00 1~.00 ~.24 8762.59 335.~ 3422.04S 719.9~V 3946341.976~M9.20 349L~191.88 34~.~ 0.~ 0.~ 0.~ ~0.2 342~0S 718~V ~.56 34.~ 281.12 35.28 BP~i-PBD
100~.20 49.~ 1~.55 ~.30 8833.6~ 1OO.~ 3490.68S ~4./IW 59462~.086~6.29 3567.~191.88 3549.13 9.~ 10.5~ IL~ 9Z2 ~91.23g ~l~V ~.03 30.70 2~9 39.~5
101~.20 ~9.64 2~9 ~.2g 88~!.63 1O~.~ 3~.68S 76~9~ 59461~.546~.01 3~192.07 3630.26 10.1~ 7.M I~ 104.2 35~.00g 75g.61W 80.~2 26.~ 28~.18 43.58 BP~i-~D
102~.20 70.20 210.71 ~848.64 ~33.99 le0.~ 36~.72~ S~9~V 5946115.926~768.~6 3~19~4S 3719.25 [0.56 6.32 i~ U6.2 3649.458 798.2~V ~.!0 22.M 2~.~ ~.~ BP~-PBD
103~.20 ~.95 216.23 88~,53 ~8.88 le~.00 3727.29S 8Sg.3~V 5946034.15644716.71 3~8~192.97 3gl2,21 10,7~ 5.52 12.~ 128.2 3732.10g 848.~V ~,88 21,~ 2~.60 49,~ B~-PBD
~D OF
10455.47 88.~ 2~.00 88~.00 ~65.35 72.27 37~.83g ~0L7RV ~94~976.74644673.~ 3~.0~t93.42 3879.57 10.~ 5.2I I~ 136.9 37~,48g 891.0~V ~,29 21.94 291.02 4~.8S
Halliburton Energy Services - Drilling Systems PSL
Proposal Repor~
Page 4
Dale: 7/6/9.5
ID: Y-I 4AWp2
Tool
11205.47 88.7'7 220.00 88~6.05 8981.40 750.00 43.58.2.5S 1394.73W 594.5393.25 644202.4~ 4572.9-T'~197.1;3 4572.95 0.00 0.00 O.0ll136.9 43~3,81 g 13:50.45W110.31 23.64 296.]6$3.88BPH~I-PBD
S EP 1 2 1995
Oil & Gas Cons. Commission
Anchorage
Halliburton Energy Services - Drilling Systems PSL
Proposal Report
Page 4
Dale: 7/6/~5
Weilpth ID: Y-I 4AWp2
Measut~ Iact Dr~ Subsea TV'D Course T O T A L O~D ~ra~ Cl~ge V~i~I Build Walk D~ ~ E~ T~I Max H~ M~ Hoz D~. V~
D~ D~. ~p~ ~e~ ~!~ O~ No~g ~ D~ ~. ~i~ R~te ~e ~ Re~l~ ~ ~ E~ ~ ~ E~r
gu~ey Too]
11205.47 88.77 220.0'0 8896.0.5 8981.40 750.00 4358.25S 1384,731A' 5945393.25 644202.411 4572.9Y/~1~7.~3 45'72.95 0,00 0.00 0.0O 136.9 43~3.81 g 1350.45W 110.31 '23.64 296.]~ 53.811 Bi~HM. PBD
C:
I--
F-
H
WELL PERMIT CHECKLIST
~M~NrS~±5,~ ............
1.
8.
9.
10.
11.
12.
13.
ENGINEERING
permit fee attached .................. F
Lease number appropriate ............... ~
Unique well name and number .............. ./Y
Well located in a defined pool ............. t~
Well located proper distance from drlg unit boundary., t2
Well located proper distance from other wells ..... 'I~
sufficient acreage available in drilling unit ..... Y
If deviated, is wellbore plat included ........ ~
Operator only affected party ............... Y
Operator has appropriate bond in force .......... Y
Permit can be issued without conservation order .... Y
Permit can be issued without administrative approval. 'i 'Y
Can permit be approved before 15-day wait ....... ~
WELL NAME
GEOL AREA
APPR DATE
-. ~ ~ ~ .
.:
GEOLOGY
14. Conductor string provided ................
15. Surface casing protects all known USDWs .........
16. CMT vol adequate to circulate on conductor & surf csg.
17. CMT vol adequate to tie-in long string to surf csg . .
18. CMT will cover all known productive horizons ..... ~~-~'~------/~
19. Casing designs adeq~at, for C, T, B & pe=frost ....
20. Adequate tankage or rese~e pit ............
22. Adequate wellbore separation proposed ..........
23. If diverter required, is it adequate ..........
24. Drilling fluid progr~ sch~atic & equip list adequate
25. BOPEs adequate .....................
26. BOPE press rating adequate; test to ~~ psig.~
27. Choke manifold complies w/~I ~-53 (Ma~ 84) ......
28. Work will occur without operation shutdo~ .......
29. Is presen:e of ~2s gas probable ............
/
30. Permit can be issued w/o hydrogen sulfide measures .... Y N
31. Data presented on potential overpressure zones ..... y /
32. Seismic analysis 9f shallow gas zones .......... Y/ N
33. Seabed condition survey (if off-shore) ......... / N '
34. Contact name/phone for weekly progress reports .... /Y N
[exploratory only]
· ,
GEOLOGY: ENGINEERING: COMMISSION:
Comments/Instructions:
'3RMS~cheklist rev 03/94
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
.~pe Subfile 2 is type:
TAPE HEADER
PRUDHOE BAY UNIT
MWD/MAD LOGS
WELL NAME:
AP1 NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 1
6621.00
S. BURKHARDT
V. HAZARD
Y-14A
500292183201
BP EXPLORATION (ALASKA) INC.
SPERRY-SUN DRILLING SERVICES
26-AUG-96
MWD RUN 2
S. BURKHARDT
V. HAZARD
MWD RUN 3
HENNINGSEN
V. HAZARD
MWDRUN 4
JOB NUMBER:
LOGGING ENGINEER: HENNINGSEN
OPERATOR WITNESS: V. HAZARD
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
21
liN
13E
4788
4574
82.88
81.38
48.77
OPEN HOLE CASING DRI~~
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING 13.375 2691.0
2ND STRING 9.625 9416.0
3RD STRING 8.500 7.000 10545.0
PRODUCTION STRING 6.000 11300.0
REMARKS: MWD - EWR4/GR.
ALL DEPTHS ARE MEASURED BIT DEPTHS.
THIS WELL, Y-14A, IS REPRESENTED BY RUNS 1 - 4.
MWD RUNS 1 & 2 WERE DIRECTIONAL WITH GAMMA R_AY (SGRC).
MWD RUNS 3 & 4 WERE DIRECTIONAL WITH GAMMA RAY (SGRC) &
ELECTROMAGNETIC WAVE 4-PHASE RESISTIVITY (EWR4).
ALL GAMMA RAY DATA WAS ACQUIRED WITH DUAL GAMMA RAY,
GEIGER MUELLER TUBE DETECTORS (DGR/SGRC).
A POSITIVE SHIFT OF 1.2 AAPI WAS NOTICED IN THE GAMMA
RAY READINGS AFTER CHANGING OUT THE MUD SYSTEM TO
FLO-PRO TYPE MUD AT 10471'.
THIS WELL WAS DRILLED TO TD AT 11300'.
NO DEPTH SHIFTS WERE DONE AS THIS LOG IS THE DEPTH
REFERENCE FOR THIS WELL.
FILE HEADER
FILE NUMBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE
GR
RP
$
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
START DEPTH
9300.0
10540.0
BASELINE DEPTH
$
MERGED DATA SOURCE
PBU TOOL CODE
MWD
$
REMARKs:
STOP DEPTH
11259.0
11266.0
EQUIVALENT UNSHIFTED DEPTH
BIT RUN NO MERGE TOP MERGE BASE
1 9195.0 10038.0
2 10038.0' 10551.0
3 10551.0 11081.0
4 11081.0 11300.0
MERGED MAIN PASS.
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: Y- 14A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
7 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
GR MWD 68 1 AAPI
RPX MWD 68 1 OHMM
RPS MWD 68 1 OHMM
RPM MWD 68 1 OHMM
RPD MWD 68 1 OHMM
FET MWD 68 1 HR
R0P MWD 68 1 FPHR
4 90 310 01 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 180 01 1
4 90 810 01 1
28
* DATA RECORD
'(T'.~ ~:# 0) 998 BYTES *
130
Total Data Records:
Tape File Start Depth = 11300.000000
Tape File End Depth = 9300.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 32009 datums
Tape Subfile: 2 225 records...
Minimum record length: 62 bytes
Maximum record length:- 998 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NTJMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9300.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
STOP DEPTH
9984.0
22-0CT-95
ISC 2.11
CIM 3.94 / SP4 5.01 / DEP 2.15
MEMORY
10038.0
9195.0
10038.0
0
35.4
41.7
TOOL NUMBER
P0447CG6
BOREHOLE AND CASING DATA
OPEN' HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
8.500
9416.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
BIOPOLYMER
9.90
65.0
10.9
37000
6.2
.000
.000
.000
.000
.0
142.0
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
.0
0
REMARKS: MWD RUN 1.
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: Y- 14A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 18
Tape File Start Depth = 10040.000000
Tape File End Depth = 9300.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
4444 datums
Tape Subfile: 3
81 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9969.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
STOP DEPTH
10521.0
23-OCT-95
ISC 2.11
CIM 3.94 / SP4 5.01 / DEP 2.15
MEMORY
10551.0
10038.0
10551.0
0
41.3
84.7
TOOL NUMBER
P0447CG6
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
8.500
9416.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTR3~TE AT MT:
MUD CAKE AT MT:
BIOPOLYMER
10.10
63.0
8.9
34000
5.0
.000
.000
.000
.000
.0
155.0
.0
.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
.0
0
REMARKS: MWD RUN 2.
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: Y-14A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI 4
2 ROP MWD 68 1 FPHR 4
4 90 310 01 1
4 90 810 01 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 15
Tape File Start Depth = 10560.000000
Tape File End Depth = 9950.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
35673 datums
Tape Subfile: 4
78 records...
Minimum record length:
Maximum record length:
62 bytes
1014' bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NO: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10327.0
EWR4 10316.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11040.0
11047.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
27-0CT-95
ISC 2.11
CIM 3.94 / SP4 5.01 / DEP 2.15
MEMORY
11081.0
10551.0
11081.0
0
82.9
92.9
TOOL NUMBER
P0433SP4
P0433SP4
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
6.000
10545.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
FLO-PRO
8.90
83.0
10.1
45000
.0
.100
.056
.080
.110
78.0
146.0
78.0
78.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
.0
0
REMARKS:
CN
WN
FN
COUN
STAT
MWD RUN 3.
$
: BP EXPLORATION (ALASKA)
: Y- 14A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
7 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI 4
2 RPX MWD 68 1 OHMM 4
3 RPS MWD 68 1 OHMM 4
4 RPM MWD 68 1 OHMM 4
5 RPD MWD 68 1 OHMM 4
6 FET MWD 68 1 HR 4
7 ROP MWD 68 1 FPHR 4
4 90 310 01 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 180 01 1
4 90 810 01 1
28
* DATA RECORD (TYPE# 0) 998 BYTES *
Total Data Records: 52
Tape File Start Depth = 11100.000000
Tape File End Depth = 10300.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 17253 datums
Tape Subfile: 5 117 records...
Minimum record length: 62 bytes
Maximum record length: 998 bytes
Tape Subfile 6 is type: LIS
FILE HEADER
FILE NUMBER: 5
RAW MW-D
Curves and log header data for each bit run in separate files.
BIT RUN NO: 4
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10995.0
EWR4 11001.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWN-HOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
11259.0
11266.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
$
27-OCT-95
ISC 2.11
CIM 3.94 / SP4 5.01 / DEP 2.15
MEMORY
11300.0
11081.0
11300.0
0
88.1
90.1
TOOL NUMBER
P0433SP4
P0433SP4
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
6.000
10545.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3) :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TEMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
FLO-PRO
8.90
83.0
10.1
45000
.0
.090
.054
.080
.110
82.0
142.0
82.0
82.0
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ) :
.0
0
REMARKS:
CN
WN
FN
COUN
STAT
MWD RUN 4.
$
: BP EXPLORATION (ALASKA)
: Y-14A
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
7 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR MWD 68 1 AAPI 4
2 RPX MWD 68 1 OHMM 4
3 RPS MWD 68 1 OHMM 4
4 RPM MWD 68 1 OHMM 4
5 RPD MWD 68 1 OHMM 4
6 FET MWD 68 1 HR 4
7 ROP MWD 68 1 FPHR 4
4 90 310 01 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 120 46 1
4 90 180 01 1
4 90 810 01 1
28
* DATA RECORD (TYPE# 0) 998 BYTES *
Total Data Records: 21
Tape File Start Depth = 11300.000000
Tape File End Depth = 10990.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
40642 datums
Tape Subfile: 6
86 records...
Minimum record length:
Maximum record length:
38 bytes
998 bytes
Tape Subfile 7 is type: LIS
96/ 8/25
O1
**** REEL TRAILER ****
96/ 8/26
01
Tape Subfile: 7 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Mon 26 AUG 96 1:24p
Elapsed execution time = 1.54 seconds.
SYSTEM RETURN CODE = 0