Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout195-147Memorandum State of Alaska Oil and Gas Conservation Connnission To' Well File: Prudhoe Bay Unit Permit # 195-147 July 9, 2002 Re: Administrative Abandonment Action Prudhoe Bay Unit Y-14A, Permit # 195-147 This memo will remain at the front of the subject well file. Well PBU Y-14A was replaced by PBU Y-14B (permit # 201-101, AP1 # 50-029-21832-02) when the permit was approved 05/23/2001. The replacement well incorporates an extension to a new bottom hole location using the existing well bore. This extension, along with the original hole, will be used for production of hydrocarbons. A review of both well files indicates administrative abandonment of the originating well bore is appropriate according to current AOGCC procedures for wells where additional permitted extension is drilled from an existing well bore. 20 AAC 25.005(a) requires a Permit to Drill for each hole drilled below the conductor unless drilled to straighten the original hole, sidetrack junk, or correct mechanical difficulties. In addition, AOGCC databases require each conductor has only one permit number and API number. Administrative abandonment of the original permit only eliminates duplication in the databases. Information for the original well and its replacement will be maintained in their respective files. The operator has been notified of this action. All future correspondence with the AOGCC should reflect the new permit number, API number and well data. Statistical Technicia eservoir Engineer Petroleum Geologist~~JJ~mmissioner SGANNED JUL ! 0 2DD2 A~~l~k OIL ~ GA~ CONSERYATIO~ COM)IISSIO~ TONY KNOWLES, GOVERNOR 333 W. 7TM AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 July 9, 2002 Mr. Randy Frazier Wells Delivery Manager Phillips Alaska, Inc. P O Box 196612 Anchorage, AK 99519-6612 Dear Mr. Frazier, Re: Administrative Abandonment Action Prudhoe Bay Unit Y'14A, Permit St 195-147 Well PBU Y-14A was replaced by PBU Y-14B (permit St 201-101, API St 50-029-21832-02) when the permit was approved 05/23/2001. The replacement well incorporates an extension to a new bottom hole location using the existing well bore. The extension, along with the original hole, will be used for production of hydrocarbons. A review of both well files indicates administrative abandonment of the originating well bore is appropriate according to current AOGCC procedures for wells where additional permitted extension are drilled from an existing well bore. 20 AAC 25.005(a) requires a Permit to Drill for each hole drilled below the conductor unless drilled to straighten the original hole, sidetrack junk, or correct mechanical difficulties. In addition, AOGCC databases require each conductor has only one permit number and API number. Administrative abandonment of the original permit only eliminates duplication in the databases. Information for the original well and its replacement will be maintained in their respective files. Please notify other cognizant personnel in your organization so that the well will be correctly identified on subsequent reports and applications submitted to the Commission. Sincerely, Steve McMains Statistical Technician AOGCC cc: Terri Hubble SCANNED JUL 1 6 2002 BEFORE W i~__.L~¢ E F' Z A J ., . 00 .... i 1259 'i'~/-,, ~ 0 0 0 .... i 0 '2 0 0 F' .T.i...] At 'i 0~07 -R ,'~'r',i*4PL~TZC, N~ ,: E, AT.. ~: It /' t /'" ¢¢J,~ ~,'" d~(~'" ~," Ar'e dr'y W,-::;,., s i: h e Ar.e we'i '1 '$ 'S, H H E N T :5 c: o rr~ p 'i '"i' a iq c i n 'i' t '¥ a 'i HOWARD OKLAND Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHOP~AGE AK, 99501. Date: RE: 3 September 1996 Transmittal of Data ECC #: 6754.00 Sent by: HAND CARRY Data: LDWG Dear Sir/Madam, Reference: PRUDHOE BAY NORTH SLOPE, AK Enclosed, please find the data as described below: Prints/Films: 1 PDK FINAL BL+RF Run # 1 Please sign and return to: Attn. Rodney D. Paulson Western Atlas Log.qing Services 5600 B Street ........ Suite 201 ", .... - ........ Anchorage, 'AK' 99518 -- Or FAX to (907)._563-7803 Received by Date: ~ . _. SEP 1 0 199~ ~chorage HOWARD OKLAND Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 9 September 1996 RE: Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL c-21 (32-19-11-14) P-01 (33-27211-13) Y-36 (41-27-11-13) M-12 Y-14A B-02A DESCRIPTION 1 PFC/PERF FIELD BL+RF 1 CN FINAL BL+RF 1 GR/CCL FINAL BL+RF 1 PLS FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF 1 PDK FINAL BL+RF 1 SBT FINAL BL+RF ECC No. Run # 1 4352.05 Run # 1 5789.02 Run # 1 5851.03 Run # 1 5863.07 Run # 1 6054.08 Run # 1 6619.01 Run # 1 6625.01 Run # 1 6631.02 Run # 1 6654.06 Run # 1 6679.01 Run # 1 6721.07 Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street Suite 201 Anchorage, AK 99518 Or FAX to (907) 563-7803 Received by: Date: 0 IR I I..I--I I~i G S EIR~./I C E S To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.' Howard Okland 3001 Porcupine Dr. Anchorage, Alaska 99501 RE: MWD FormafionEvaluafionLogs - Y-14A AK-MM-951054 September 03, 1996 The technical data listed below is being submitted herewith. Please acknowledge receipt by remming a signed copy of this transmittal letter to the attention of~ Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 1 LDWG formatted LIS tape with verification listing. APl#: 50-029-21832-01 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc. Company LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE ~--'~, 99501. Date: 19 March 1996 Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL DESCRIPTION 1 CN FINAL BL+RF 1 CCL FINAL BL+RF ! PFC/PERF FINAL BL+RF 1 GR/CCL FINAL BL+RF 1 SBT FINAL BL+RF 1 PFC/PERF FINAL BL+RF Run # 1 Run # 1 Run ~ 1 Run # 1 Run # 1 Run # 1 ECC No. 5855.05 6036.08 6625.00 6626.00 Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street Suite 201 Received by: Anchorage, AK 99518 Or FAX to (907) 563-7803 (~~ -- Date: ,~Jaska Oil & Gas Cons. Commission Anchorage WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Comervation Comm. Attn: Larry Grant 3001 Porcupine Dr. (~?~ "i ~ Anchorage, Alaska 99501 MWD Formation Evaluation Logs - Y-14A, AK-MM-951054 February 27, 1996 The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this of this transmittal letter to the attention of: Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518 2" x 5" MD Resistivity and Gamma Ray Logs: 50-029-21832-01 1 Blueline 1 Rev Folded Sepia 2" x 5" TVD Resistivity and Gamma Ray Logs: 50-029-21832-01 1 Blueline 1 Rev Folded Sepia 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252 A Dresser Industries, Inc, Company STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMP LETION REPORT AND LOG I1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number .B. P Exploration 95-147 3. Address 8. APl Number P. O. Box 196612, Anchora~le, Alaska 99519-6612 50-029-21832-01 i4. Location of well at surface 9. Unit or Lease Name 492' SNL, 4572' WEL, SEC, 34, T11N, R13E i' ~:il~:, ~.~ ~:.~ .._~~:'~ ...... i'~' .......... Prudhoe Bay Unit At Top Producing Interval~; .2.~,,~._.~///~- -./~'--' _~' ii!~~ 10. Well Number 4293' SNL, 353' WEL, SEC, 33, T11N, R13E ~ '~, ' Y-14A ; :.~,-;~'~;:.,' il ..... 'i' " 11. Field and Pool At Total Depth '- '"(~-/"~--: '."i' .' Prudhoe Bay Field/Prudhoe Bay Pool 4986' SNL, 718' WEL, SEC. 33, T11N, R13E 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. KBE = 82.88 ADL 028287 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 16. No. of Completions 10/20/95 10/27/95 11/01/95I N/A feet MSL One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set 21. Thickness of Permafrost 11300'MD/9000' TVD 11300'MD/9000' TVD YES [] NO [] 2192 feet MD 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, L WD/FE, GR 23. CASING, LINER AND CEMENTING RECORD SE'FRNG DEPTH MD CASING SIZE WT'. PER FT. GRADE TOP BO-Iq'OM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" Cond Surface 110' 8 cu yd Concrete 13-3/8" 68# L-80 Surface 2686' 17-1/2" 3723 cu ft Arctic Set II & III 9-5/8" 47# L-80 NSCC Surface 6991' 12-1/4" 9-5/8" 47# L-80 Butt 6991' 9416' 12-1/4" 2116 cuft Class 'G' 7" 29# L-80 9243' 10541' 8-1/2" 298 cuft Class 'G' 4-1/2" 12.6# L-80 10398' 11300' 6" Uncemented Slotted Liner 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" Slotted Liner 4-1/2" 10093' 10036' MD TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10532'- 10614' 8978'- 8985' Freeze Protected w/140 bbls Diesel 10649'- 10769' 8987'- 8985' 10868' - 11154' 8987' - 8996' 11156' - 11276' 8996' - 8999' 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) November 10, 1995 Gas Lift Date of Test Hours Tested PRODUCTION FOR OlL-BBL GAS-MCF WATER-BBL CHOKE SlZE IGAS-OIL RATIO TEST PERIOD II~ I Flow Tubing Casing Pressure CALCULATED,,~ DIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. · ORIGINAL ~%1~;L;3~.~ ....... ~,'. Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE /9. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag River 10160' 8873' Shublik 10201' 8896' Top of Sadlerochit 10515' 8977' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ¢~"~ /~/~/ ~ Title SeniorDrillincEngineer Date /¢/¢~ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: Y-14A BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: 10/16/95 01:00 SPUD: RELEASE: 11/01/95 05:30 OPERATION: DRLG RIG: DOYON 14 WO/C RIG: DOYON 14 10/17/95 ( 1) TD: 0' ( 0) 10/18/95 (2) TD: 0' ( 0) 10/19/95 (3) TD: 9456' (9456) 10/20/95 (4) TD: 9216' ( 0) 10/21/95 (5) TD: 9580' ( 364) 10/22/95 ( 6) TD:10038' ( 458) 10/23/95 (7) TD:10489' ( 451) PULL TBG HANGER MW: 0.0 VIS: 0 MOVED RIG OVER WELL, ACCEPTED RIG 10/16/95 13:00 HRS. RIG UP AND EQUIPMENT WORK. R/U TO PULL TUBING HANGER. SERVICED TUBING HANDLING EQUIP MW: 0.0 VIS: 0 PULL SINGLE COMPLETION, 3-1/2" OD. CBU AT 9525'. L/D TUBING T/2000'. M/U AND SET HOWCO STORM PACKER. PACKER SET WITH VALVE 2' BELOW LDS. CHANGED OUT AND TESTED PACKOFF. CHANGED BLIND RAMS FOR SHEAR RAMS. TEST BOPE, WAIVED BY AOGCC, DOUG AMOS. INSTALLED WEAR RING. PULLED AND L/D HOWCO STORM PACKER. L/D TUBING T/7525'. TUBING HANDLING EQUIPMENT CHANGED OUT. MILLED CASING AT 9456' MW: 0.0 VIS: 0 BHA #1, SINGLED IN DP T/9536', TOP OF FISH. TAGGED TOP OF 3-1/2" STUMP, CUT AT 9525' WLM. CIRC, HOLE DISPLACED WITH WATER BASED MUD. MILLED CSING AT 9456' (MOVED SECTION 16' LOWER THAN PLANNED TO AVOID STARTING SECTION AT A COLLAR.) BHA #2, ORIENT MWD MW: 0.0 VIS: 0 BHA #1, MILLED CASING 9416' TO 9466'. CBU, POOH, MU 5" MULE SHOE AND RIH. RAN DP T/9523', BOTTOM OF SECTION AT 9466' PREVIOUS TAG OF 3-1/2" TBG AT 9536'. ATTEMPTED TO WASH DEEPER, NO SUCCESS. BATCH MIX AND PUMP CEMENT SLURRY. EXPECT TOC AT 9216'. CBU, INJECTIVITY TEST, UNABLE TO INJECT FLUID. PULLED DP T/0'. WASHED, FLUSH BOP STACK. BHA #2, ORIENT AND CALIBRATE MWD TOOL. DRILLED T/9580' MW: 0.0 VIS: 0 BHA #2, RIH T/9152'. BREAK CIRC EVERY 1000' CBU, WASH AND REAM TO TOC AT 9290'. DRILL FIRM CEMENT F/9~90' TO 9421' TOP OF SECTION AT 9416'. DRILLED T/9466', PAST CASING STUB. DRILLED T/9580' RIH T/2500' MW: 0.0 VIS: 0 BHA %2, DRILLED T/10038', REACHED PLANNED END OF RUN. CBU, POOH T/O' BHA ~3, RIH T/2500' DRILLED T/10489' MW: 0.0 VIS: 0 BHA #3, RIH T/10008' LOGGED HOLE WITH LWD. MAD PASS TIE-IN WITH GR. BENCHMARK SURVEY AT 10011' DRILLED T/10489' WELL : Y-14A OPERATION: RIG : DOYON 14 PAGE: 2 10/24/95 (8) TD:10551' ( 62) 10/25/95 (9) TD:10551 PB: 0 10/26/95 (10) TD:10677' ( 126) 10/27/95 (tl) TD:ll081' ( 404) 10/28/95 (12) TD:ll300' ( 219) 10/29/95 (13) TD:ll300' ( 0) 10/30/95 (14) TD:ll300 PB:ll300 PUMP HI VIS SWEEP MW: 0.0 VIS: 0 BHA ~3, DRILLED T/10551', REACHED PLANNED END OF RUN. CBU, POOH T/400'. PULLED BHA. BHA #4, HOLE OPENER RUN. RIH T/10009, REAMED T/10551'. CBU, POOH T/9965'. RIH T/10551', WORKED TIGHT SPOT AT 10165'. CIRC, PUMP HI VIS SWEEP. PULLED DP T/0' MW: 0.0 BHA ~4, CBU AT 10551' PULL AND LAID OUT BHA. R/U CASING HANDLING EQUIPMENT. RAN CASING T/1310', CBU. RAN CASING T/9400', CIRC. BROKE CIRCULATION, RAN CASING T/10541', SETTING DEPTH BATCH MIX AND PUMP CEMENT SLURRY. PLUG BUMPED, RELEASED HANGER, ENGAGE DOGS AND SET PACKER. CIP AT 0100 HRS. REVERSE CBU AT 9243'. PULLED DP T/0' DRILLING MW: 0.0 VIS: 0 PULLED DP T/0', L/D BAKER RUNNING TOOL. TEST BOP'S AND MANIFOLD. WITNESS WAIVED BY J. SPAULDING - AOGCC. BHA #5, RIH T/10369'. TAG UP ON CEMENT STRINGER. LANDING COLLAR AT 10453'. PRESSURE TEST CASING. DRILLED CEMENT T/10555', CIRC. DRILLED T/10677' RIH T/1000' MW: 0.0 VIS: 0 BHA #5, DRILLED T/il081', DOWNHOLE WASHOUT. POOH T/0', FOUND 2 WASHOUTS IN STRING. BHA #6, RIH T/1000' REAMED T/10865' MW: 0.0 VIS: 0 BHA #6, RIH T/11026', REAMED T/l1081' DRILLED T/il300', REACHED PLANNED END OF RUN. CBU, POOH T/0', DOWNLOAD MWD. BHA #7, HOLE OPENER RUN. RIH T/10551', REAMED T/10865' TESTING ANNULUS MW: 0.0 VIS: 0 BHA #7, REAMED T/11300' CBU, POOH T/10540', RIH T/11300' PULLED BHA. R/U CASING HANDLING EQUIPMENT. RAN 4-1/2" SLOTTED LINER T/920'. HANGER ASSEMBLY INSTALLED. RAN DP T/10530', CIRC. RISER DISPLACED. RIH W/LINER TO BOTTOM, NO PROBLEMS. CIRC AT 11300', DROP BALL. PUMP MUD, SPACER AND DISPLACE TO SEAWATER. PACKER SET, TESTING ANNULUS. SHEAR OUT DUMP VALVE MW: 0.0 CIRC AT 11300', TESTED ANNULUS, RELEASE F/PACKER. CONTINUE DISPLACEMENT TO SEAWATER. PULLED DP T/10350', CIRC. PULLED DP T/0', L/D TUBING.BAKER CTC ECP INFLATION RUN. R/U HANDLING TOOLS, P/U HIT TOOL AND TUBING. RIH T/10849', SETTING DEPTH. CIRC, R/U BJ. TEST LINES, ARM DOGS IN TOOL, LOCATE INTO PROFILE, SHEAR BALL. PUMP PREFLUSH. DROP DART, PUMP CEMENT, DROP SPONGE. PUMP POSTFLUSH, ALIGN TO RIG PUMPS. DROPPED BALL, CIRC AT 10849'. INJECTIVITY TEST, COMPLETED. POOH T/10447', REVERSE CIRC. SHEAR OUT DUMP VALVE, REVERSE OUT POST FLUSH. WELL · Y-14A OPERATION: RIG : DOYON 14 PAGE: 3 10/31/95 (15) TD:ll300 PB:ll300 11/Ol/95 (16) TD:ll300 ?B:l1300 RUNNING 4-1/2" COMPLETION MW: 0.0 POOH W/CTC HORIZONTAL INFLTATION TOOL. L/D HIT TOOL. BHA #8, CLEANOUT RUN FOR CEMENT AND TO SPOT BLEACH BREAKER. RIH T/11154', TAG 7" LINER TOP. WASHED PAST W/NO PROBLEMS. CIRC, ACID SPOTTED DOWNHOLE. L/D DP, TEST WELL CONTROL EQUIPMENT. BEGAN RUNNING 4-1/2" COMPLETION. RIG RELEASE MW: 0.0 RAN 4-1/2" TUBING AND 6 GLM'S. SCSSV NIPPLE ASSEMBLY INSTALLED. LANDED TUBING AND LOCKDOWN HANGER. SET PACKER AT 10035' PRESSURE TESTED TUBING. R/D BOP STACK. INSTALLED XMAS TREE. FREEZE PROTECT WELL. SET BPV, SECURE WELL. RIG RELEASED AT 05:30 11/01/95. SIGNATURE: (drilling superintendent) DATE: SPF~---~Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/Y-14A 5oo2921832o1 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/30/95 DATE OF SURVEY: 102895 MWD SURVEY JOB NUMBER: AK-MM-951054 KELLY BUSHING ELEV. = 82.88 OPERATOR: BP EXPLORATION FT. TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 9403.08 8309.56 8226.68 9416.00 8320.10 8237.22 9421.00 8324.18 8241.30 9593.97 8461.14 8378.26 9688.47 8531.32 8448.44 35 22 S 23.08 W .00 3068.50S 657.71W 35 16 S 23.27 W 1.20 3075.37S 660.65W 35 13 S 23.34 W 1.12 3078.02S 661.79W 40 4 S 29.79 W 3.61 3172.24S 709.27W 43 58 S 29.89 W 4.13 3227.11S 740.75W 3123.15 3130.59 3133.46 3237.67 3299.51 9781.74 8599.07 8516.19 9875.15 8668.03 8585.15 9968.78 8737.79 8654.91 10007.28 8766.63 8683.75 10038.13 8789.71 8706.83 42 50 S 32.23 W 2.11 3282.02S 773.80W 41 58 S 32.97 W 1.07 3335.10S 807.74W 41 41 S 34.21 W .94 3387.12S 842.29W 41 16 S 33.34 W 1.84 3408.31S 856.46W 41 51 S 34.79 W 3.64 3425.27S 867.93W 3361.87 3422.75 3482.82 3507.32 3526.96 10069.82 8812.92 8730.04 10100.69 8834.67 8751.79 10131.56 8855.34 8772.46 10162.60 8874.76 8791.88 10193.56 8892.42 8809.54 43 56 S 33.06 W 7.54 3443.17S 879.96W 46 29 S 29.92 W 10.97 3461.85S 891.39W 49 24 S 28.07 W 10.45 3481.90S 902.49W 53 5 S 26.84 W 12.28 3503.38S 913.65W 57 20 S 26.20 W 13.83 3526.13S 925.00W 3547.67 3568.95 3591.43 3615.28 3640.41 10224.62 8908.27 8825.39 10255.28 8922.07 8839.19 10287.03 8934.39 8851.51 10318.74 8944.98 8862.10 10350.27 8953.79 8870.91 61 15 S 25.91 W 12.58 3550.12S 936.72W 65 15 S 25.51 W 13.13 3574.79S 948.60W 69 3 S 25.72 W 11.95 3601.17S 961.24W 71 56 S 25.69 W 9.15 3628.10S 974.21W 75 34 S 26.02 W 11.56 3655.33S 987.41W 3666.83 3693.94 3722.91 3752.51 3782.47 10381.23 8960.65 8877.77 10412.89 8965.79 8882.91 10443.80 8969.52 8886.64 10474.63 8972.74 8889.86 10506.09 8975.75 8892.87 78 48 S 26.70 W 10.65 3682.38S 1000.81W 82 31 S 27.13 W 11.79 3710.23S 1014.95W 83 37 S 27.26 W 3.58 3737.52S 1028.97W 84 22 S 26.53 W 3.39 3764.87S 1042.84W 84 39 S 26.21 W 1.37 3792.92S 1056.75W 3812.31 3843.15 3873.41 3903.68 3934.63 10558.85 8980.53 8897.65 10589.63 8983.23 8900.35 10620.60 8985.65 8902.77 10652.39 8987.21 8904.33 10683.99 8987.58 8904.70 84 56 S 27.14 W 1.83 3839.87S 1080.34W 84 59 S 25.73 W 4.57 3867.33S 1093.99W 86 3 S 27.52 W 6.70 3894.92S 1107.82W 88 19 S 29.31 W 9.11 3922.84S 1122.93W 90 18 S 28.66 W 6.59 3950.48S 1138.24W 3986.53 4016.84 4047.33 4078.53 4109.51 10714.92 8986.98 8904.10 10745.96 8985.67 8902.79 10776.77 8984.22 8901.34 10807.79 8983.35 8900.47 10839.71 8984.23 8901.35 91 54 S 31.12 W 9.49 3977.29S 1153 92 55 S 30.69 W 3.57 4003.90S 1169 92 28 S 30.15 W 2.30 4030.43S 1185 90 44 S 29.77 W 5.71 4057.30S 1200 86 6 S 26.44 W 17.86 4085.43S 1215 .65W · 58W .16W · 64W .67W 4139.74 4169.93 4199.95 4230.25 4261.62 SPF?~Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE 2 SHARED SERVICES DRILLING PBU/Y-14A 500292183201 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/30/95 DATE OF SURVEY: 102895 MWD SURVEY JOB NUMBER: AK-MM-951054 KELLY BUSHING ELEV. = 82.88 FT. OPERATOR: BP EXPLORATION TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS INCLN DG MN COURSE DLS TOTAL DIRECTION RECTANGULAR COORDINATES DEGREES DG/100 NORTH/SOUTH EAST/WEST VERT. SECT. 10869.41 8987.07 8904.19 82 54 S 28.16 W 12.25 4111.70S 1229.22W 10900.17 8990.83 8907.95 83 4 S 27.81 W 1.26 4138.66S 1243.55W 10931.26 8993.90 8911.02 85 35 S 26.19 W 9.62 4166.22S 1257.59W 10962.60 8995.50 8912.62 88 33 S 25.37 W 9.80 4194.40S 1271.20W 10993.51 8996.03 8913.15 89 30 S 26.95 W 5.98 4222.14S 1284.83W 4290.77 4320.81 4351.33 4382.32 4412.89 11024.37 8996.04 8913.16 90 25 S 27.58 W 3.61 4249.57S 1298.96W 11043.55 8995.87 8912.99 90 35 S 28.83 W 6.57 4266.47S 1308.03W 11074.64 8995.52 8912.64 90 42 S 28.75 W .46 4293.71S 1323.00W 11105.42 8995.30 8912.42 90 5 S 29.37 W 2.85 4320.62S 1337.95W 11136.17 8995.76 8912.88 88 12 S 27.56 W 8.49 4347.64S 1352.60W 4443.32 4462.17 4492.68 4522.86 4553.06 11167.19 8996.76 8913.88 88 5 S 26.57 W 3.21 4375.25S 1366.71W 11198.90 8997.72 8914.84 88 25 S 25.90 W 2.37 4403.68S 1380.72W 11230.60 8998.41 8915.53 89 6 S 27.99 W 6.93 4431.93S 1395.08W 11245.77 8998.64 8915.76 89 4 S 26.63 W 8.97 4445.40S 1402.04W 11300.00 8999.52 8916.64 89 4 S 26.63 W .00 4493.88S 1426.34W 4583.65 4615.00 4646.27 4661.23 4714.80 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. HORIZONTAL DISPLACEMENT = 4714.80 FEET AT SOUTH 17 DEG. 36 MIN. WEST AT MD = 11300 VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION COMPUTED ALONG 197.71 DEG. TIE IN POINT 9403.08' WINDOW POINT 9416' INTERPOLATED DEPTH 11300' SPF~-'Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBU/Y-14A 5oo2921832o1 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/30/95 DATE OF SURVEY: 102895 JOB NUMBER: AK-MM-951054 KELLY BUSHING ELEV. = 82.88 OPERATOR: B~P EXPLORATION FT. INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 9403.08 8309.56 8226.68 3068.50 S 657.71 W 1093.52 10403.08 8964.41 8881.53 3701.58 S 1010.53 W 1438.67 345.15 11300.00 8999.52 8916.64 4493.88 S 1426.34 W 2300.48 861.82 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE-DIMENSION MINIMUM CURVATURE METHOD. SPF~--~Y-SUN DRILLING SERVICES ANCHORAGE ALASKA PAGE SHARED SERVICES DRILLING PBO/Y-14A 5oo2921832o1 NORTH SLOPE BOROUGH COMPUTATION DATE: 10/30/95 DATE OF SURVEY: 102895 JOB NUMBER: AK-MM-951054 KELLY BUSHING ELEV. = 82.88 FT. OPERATOR: BP EXPLORATION INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASD VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST MD-TVD VERTICAL DIFFERENCE CORRECTION 9403.08 8309.56 8226.68 3068.50 S 657.71 W 1093.52 9493.78 8382.88 8300.00 3117.06 S 679.87 W 1110.90 17.38 9622.64 8482.88 8400.00 3188.46 S 718.56 W 1139.76 28.86 9759.66 8582.88 8500.00 3269.32 S 765.79 W 1176.78 37.02 9895.13 8682.88 8600.00 3346.31 S 815.01 W 1212.25 35.47 10028.96 8782.88 8700.00 3420.24 S 864.44 W 1246.08 33.83 10176.57 8882.88 8800.00 3513.55 S 918.74 W 1293.69 47.61 10585.61 8982.88 8900.00 3863.72 S 1092.25 W 1602.73 309.04 10623.08 8985.82 8902.94 3897.11 S 1108.97 W 1637.26 34.54 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS TONY KNOWLES, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 September 21, 1995 Terry Jordan, Senior Drilling Engineer BP Exploration (Alaska), Inc. P O Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Unit Y-14A BP Exploration (Alaska), Inc. Permit No 95-147 Surf Loc 4788'NSL, 4574'WEL, Sec. 34, T11 N, R13E, UM Btmhole Loc 397'NSL, 696'WEL, Sec. 33, T11 N, R13E, UM Dear Mr. Jordan: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt.you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before ddlling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be Id inspector 659-3607. David WT~'tlsto n Chairman BY ORDER OF THE COMMISSION /encl c: Dept of Fish & Game, Habitat Section - w/o encl Dept of Environmental Conservation - w/o encl STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redr, ll FIIlb. Type of well. 'E"~'1o~;i;7371-1 Stratigraphi. c Test [] Development Oil [] · Re-Entry [] DeepenE!I Service [] Development Gas [] SingleZone [] Multiple Zone[] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration 85 feet Prudhoe Bay Field/Prudhoe 3. Address .6. Property Designation Bay Pool P. O. Box 196612. Anchoraae. Alaska 99519-6612 ADL 0£~2~7 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 ,~c 2s.o25) 4788' NSL, 4574' WEL, SEC. 34, T11N, R13E Prudhoe Bay Unit At top of productive interval 8. Well number Number '1188' NSL, 258' WEL, SEC. 33, T11N, R13E Y-14A 2S100302630-277 At total depth 9. Approximate spud date Amount 397' NSL, 696' WEL, SEC. 33, T11N, R13E 09/25/95 $200,000.00 12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth(uDand'rVD) property line ADL047471 397 feet' NoCloseApproach feet 2560 11205'MD/8965'TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth 94~o feet Maximum hole angle 8~.7 o Maximum surface 3330 psig At total depth ('I'VD) 8800'/4390 psig 18. Casing program Setting Depth s~ze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Leng~th MD TVD MD TVD (include stage data) 8-1/2" 7" 29# L-80 Butt 1005' 9450' 8348' 10455' 8965' 274 sx Class 'G' 6" 4-1/2" 12.6# L-80 Butt 2373' 10455' 8965' 11205' 8981' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet" Plugs (measured) true ~ertical feet Effective depth: m, easured feet Junk (measured) true vertical feet Casing Length Size ., Cemented Measured depth True Vertical depth Structural Conductor .,- Surface RE,.ciVED Intermediate Production SEP 1 8 1995 Liner Perforation depth: measured Ataska (Jll & Gas Cons. C0mmJssJ0n true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[] Drilling fluid program [] Time vs depth plot [] Refraction analysis[] Seabed reportl-1 20 AAC 25.050 requirementsl-1 21. ! hereby certify that the ~rego[ng is true and correct to the best of my knowledge "'?~. '/~ -Title Senior Drilling Engineer Date /~-/'- Signed 5P01 Commission Only Use P erm~r~.....iANu m ber/,~¢ ~ I° v..al date I See cover letter ,~/'-- ¢5'-' Ifor other requirements Conditions of approval Samples required [] Yes [] No Mud log required []Yes [] No Hydrogen sulfide measures [] Yes [] No Directional survey required [] Yes [] No Required working pressure for BOPE I-]2M; []3M; []5M; 1-110M; I-I15M; Other: Original Signed By by order of / Approved by David W. Johnston Commissioner [ne commission Date Form 10-4nl Re,/ 10_-~_¢~c///~ / Submit id 151icate I Well Name: I Y-14A Redrill Plan Summary IType of Redrill (producer or injector): PRODUCER Surface 492 FNL & 706 FWL, Sec. 34, T11N/R13E Location: Target Location: 1188' FSL & 258' FEL, Sec 33, T11 N/R13E Bottom Hole -- 397' FSL & 696 FEL, Sec 33, T11N/R13E Location: AFE Number: 4P0721 IRig: I DOYON RIG #14 Estimated Start 9/25/95 Date: Operating days to complete: 25 IMD: 1~205' I I TVD' 18965' IKBE: 185.45 I Well Design (conventional, slimhole, etc.): HORIZONTAL SIDETRACK I Objective: I SADLEROCHIT ABNORMAL PRESSURE Special design considerations NONE. NO ABNORMAL PRESSURE ANTICIPATED. RESERVOIR PRESSURE HIGHLY CONSISTENT IN "Y" PAD AREA AT 3500 PSI SEP 1 8 1995 0il & Gas Cons. Commission Anchorage Y-14A Redrill Plan Summary Page 1 Mud Program: An 10.0-10.2 ppg mud will be used for the 8 1/2" intermediate hole and 9.0 ppg will be used on the 6" production hole. Special design I~ considerations Depth Densi PV YP INT 10MIN FL OIL SOLID (TVD) ty (CP) (#/FT GEL GEL cc/30 (%) S (PPG) ) min (%) KOP' 10.0 10 15 5 10 5 0 5 to to to to to to to to to 10455 10.1 18. 30 15 30 7 0 10 Depth Densi PV YP INT 10MIN FL OIL SOLID (TVD) ty (CP) (#/FT GEL GEL cc/30 (%) S (PPG) ) min (%) 10455 9.0 10 45 5 10 5 0 5 to to to to to to to to to 11205 9.1 15 50 15 30 7 0 10 Directional: I KOP= 19450 Maximum Hole Angle: Close Approach Well: 88.7° The above listed wells will be secured during the close approach. SEP 12 1995 Casinq/Tubinq Proqram: ~)i[ & Gas Cons. Commission Hole Csg/ Wt/Ft Grade Conn Length Top -Btm Size Tbg O.D. MDrrVD MDFrVD 8.5" 7" 29.0 L-80 butt 1005 9450/8348 10455/8965 6" 4 1/2" 12.6 L-80 butt 2373 10455/8965 11205/8981 Y-14A Redrill Plan Summary Page 2 Cement Calculations: Liner 7" 29#, L-80,NSCC Size: Basis: 50% open hole excess, 80' shoe joint, 150' liner lap (9 5/8"), and 200' excess above liner top. Total Cement 571 274sxs of Class G Blend @ 1.17 ft3/sx Volume: Bbls I Liner Size: 4 1/2", 12.6#, L-80, NSCT Basis: excess above liner top. 50% open hole excess, 80' shoe joint, 150' liner lap and 200' Total Cement Volume: 125 Sx of Class "G" Blend @ 1.17 ft3/sx Well Control: Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed and is capable of handling maximum potential surface pressures. Diverter, BOPE and mud fluid system schematics on file with AOGCC. Hazards and Contingencies Mud weights should be kept to a minimum while drilling through the horizontal section (+_9.0 ppg) to prevent differential sticking. With 9.0 ppg the hydrostatic is +_4195 psi which is well over the formation pressure of +_3675 psi. ., SEP ~ ~ ~995 Gas Cons. Commission Anchorage Y-14A Redrill Plan Summary Page 3 o 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. SUMMARY PROCEDURE 1. Pre-Rig Work: RU slickline. RIH and ensure the sliding sleeve at 9657' is closed. RU cementers and tie directly into tree down the production tubing, mix and pump 25 bbls of Class "G" and displace with 85 bbls of seawater (top of cement @ _+9800'), POOH, RU wireline, RIH with jet cutter and tag top of cement with AOGCC representative present (top of cement must be above 9952'), then jet cut 4 1/2" production tubing at _+9665', POOH, freeze protect, install BPV, RDMO. 2. Move in drilling rig. 3. Pull BPV. Circulate diesel freeze protection cap from well and recover for future use. 4. Install a TWO valve. Remove the production tree. 5. Install BOP's and test to 5000 psi. Remove the TWC valve. 6. Pull and lay down the 4 1/2", 12.6#, L-80, BUTT tubing, RU wireline, 7. PU 9 5/8" section mill, RIH to 9600', spot heavy mud to 9500', pull section mill to 9450'. 8. Displace well to FLO-PRO/milling fluid. Cut a 50' section in the 9 5/8" casing starting from about 9450'-9500' MD. POOH RIH with open ended drill pipe to 9600' and lay a cement plug back to 9250', POOH. Run in with a 6 3/4" steerable drilling assembly and a 8 1/2" bit with gamma ray/directional MWD. Contact AOGCC to witness tag of cement for abandonment purposes. Dress the cement to 5' below the section top. Kickoff and if necessary displace well to clean FLO-PRO system. Continue to directionally drill to the 7" casing point at _+10455' at 88.7° (see attached directional plan). Make a conditioning trip with an 8 1/2" hole-opener for the open hole section Install a 7", 29#, L-80, BUTT Solid liner with 7" X 9-5/8" packer/hanger. Packer / hanger to be set at _+9300' MD. Cement the liner in place with the total cement volume based upon 50 % open-hole enlargement plus the 80' shoe volume, 9-5/8 X 7" lap volume, and 150' excess on top of the liner with drillpipe in the hole. Re-test BOP's as needed. PU 3 1/2" drill pipe and 4 3/4" steerable drilling assembly with gama ray and directional MWD. RIH and cleanout liner to landing collar, test casing to 3500 psi. Drill out shoe and continue to drill horizontally to 11205' MDTD. Install a 4 1/2",12.6#,L-80,BUTT slotted liner with 4 1/2" X 7" hanger/packer. The liner hanger is to be at _+10305'. There exists a possibilty that the liner will be run with two ECP,s as dictated by geology. Run the 4-1/2" L-80 completion string assembly using as much 4-1/2" used tubing and jewelry as possible. Space out and circulate with corrosion inhibitor. Install a BPV and test plug. Remove BOP's. Install and test the production tree to 5000 psi. Pull tree test plug and BPV. Set packer. Test the tubing x casing annulus to 3500 psi for 30 minutes. Shear RP valve in the upper GLM and freeze protect the well. Set a BPV. Release rig. Complete appropriate documentation and hand-over to Production. SEP 995 Gas Cons. Commission Anchorage Y-14A Redrill Plan Summary Page 4 I TREE: 4" CIW Y 14A Planning KBE = 89,0' (Nabors 28E) WELLHEAD: FMC .. BF-MSL = 51.91' Sidetrack out of 9 5/8" Casing t OTIS  SSSV Landing Nipple GAS LIFT MANDRELS ~ Z O ~- ~, .+.2200' (W/1" BK LATCHES) 13-3/8" = NO MD ! TVD(RKB) 72 #/ft 1 80' "Above liner lap L-80 BTC Production Tubing 2 i 7,250' 4-1/2" 12.6#/ft L-80 NSCT ' 3 6700' j i 4 5900' , --" 5 4750' STANDARD 'X/X/XN' Completion 6 3000' ~ ' 1 I 7"x9-5/8" Hanger/Packer ~ r ~ ~ Set ±150' from top of window @ +_ 9,850' md !~!~ [ ~ Sidetrack KOP @ + 9,950' md ~ilI ~ ~ Window cut @ 10,000' - 10,050' md ?~, ,:~. 4-1/2 Slotted Lmner Runmng Order ~t~ ~ i ~ Note: Run TIW SS Packer (6') ~ ~ ~. Blank joint of liner (40') ~, % ~;~. 2' CTC Profile Sub (2') (** may not be needed) ~ ~ ~ ~ Ported Nipple Joint (40') ~ ~~Slotted1 SIottedDner. Joint tot°TDCS g shoe (40) i ~ ~,~ ~ Set liner top @ + 130' from 5-1/2" casing shoe ~.- ~i 4-1/2" x 7" Packer ~ i ~ ~ - . Set @ d: 10,730' (WLEG at least 50' above Top Sag or at 60°) @9250' md ~.'~ ~T~. Set @ + 10,374' md at 89.6° inclination 3-1/2" X~Packer 9-5/8" ~-~- I,~;.~ I Estimated TOC @ 9,750' md~' TD @ 11232' MD 7" Liner Top '~, ~ ~' 9-5/8" 47 #/ft L-80 BTRS CTC ECP Assembly ~ ~ (2 are planned) ~ Setting Depth TBD @ TD ~ : Perforations Summary ~ I Size SPF Interval Open/Sclz'd ' 5 6 ~ 0,174'-10198' ! Sqz Re per[ 2.2 5 10,198'-10,210' Sqz'd 2.2 6 11,380'-11,520 Sqz Re per[ Z ~ ~ PBTD 10,445' MD __.,... 7' 26#/ft L-80 Liner /lO,487'MD I DATE REV. BY COMMENTS PRUDHOE BAY UNIT 5/15/95 DMS PROPOSED SIDETRACK COMPLETION WELL: Y-14a APl NO: 50-029--218332-00 SEC 33; T11N; R13E BP EXPLORATION GAS LIFT MANDRELS (WI 1" BK LATCHES) NO MD TVD(RKB) 80' Above liner lap 7,250' 6700' 5900' 4750' 3000' EP 1 2 1995 Gas Cons. Commission Anchorage .~iPM ~ HF~_/ISURTON DRILLING 4. ~e~vice~ .Onillln~-' . cate PLane: Zone4 ~/F1A: Y-Pad ~' ~TON looo 5000 o SCALE ,503 Pt. / I)IVISIEN 1~' ~ ~ 3149 ~1 8 ~ ~ ~'845 ~ VERTICAL SECTICN PLANE~ 197~3 S EP 12 1995 Gas Cons. Commission Anchorage ~5 8975 8975 NS E'~ G~;d X ~cl Y ,T~CO S g57 4391 S ~ $ 1619 6' C-4,3<)54 ~120 4555 $ 676 ~' 644915 59~52.10 TVD Bc~31.40 H~ 11805.47 N/S 4,358,L:~ EA,/ 1;384.73 $'£P 'l 2 995 Alaska 0il & Gas Cons. Commission Anchorage Sun'ey Rrf~c'e: WELLHEAD Refe~noe World ~[nst~: ~t. 70.16.13 N - ~D 148,49.24 W Rcr~n~ GRID ~: ~ S~ Pla~ ~,e: ~a 4 Rcf~e GRID C~i~ ~ S9497~.00 N 645~3.00 ~ N~h ~i~d To: ~UE NOR~ Cl~c R~: WEL~E~ ~ Rcf~n~ Halliburton Energy Services - Drilling Syslems PSL Proposal Rcporl IF;N-C.4DDS REFZ I.B 197.63 Page I Da~c: Time: 2:35 pm Wellpad't ID: Y-I 4A1Vp2 ~ Revision: 7/6/95 BPX.-Shared Serv~ce~ Drilling Alaska Stale Plane: Zorn:4 PBU: WOA: Y-Pad ¥-14A Y-14A Wp2 Ptelirr~ twllp~ GRID Coordbutts Clesum Vtrti~l Build Walk DLS Cam. E,.xp~ed Total Max Her Mitt Ha Dir. NoNhing EaL~ng Dist. Dig. Sect[on Rate Rale Dogleg Rec~ngularCoords Erter Errs' l~faXEn' Efta' (fl) (a) (It) (d~,.) (fl) (4~t0oa) Cs, to0a) (rig/teaR) tar-r,) (a) (a) (S) (a) gun, v/Toot 0.O0 0.00 0.00 -85.3:5 0.00 0.00 O.OON 0.00 E 5949777.00 645503.00 O.O~ 0.00 0,00 0.00 O.00 0.O0 O.O 0.00N 0,00 E 0.00 0.00 0.00 0.00 MWD 105.55 0.17 247.5:~ 20.20 105.55 IOI:55 O.065 O. 14W 59497?6.94 645502.86 0.1(~R47.-45 0.10 0.16 O.O0 0.16 0.2 0.06S O.14W 2.00 2.00 337.55 0.0:5 BPHG-PDD 205.55 0.-12 230.42 120.20 205.55 IO0.00 0.25S 0.50~V 5949776.7064550231 0.$1~9..3~ 0.43 0.15 -17.13 OAT 0.3 0.298 0.50~V 2.07 2.07 321..91 0.30 BPHG-PBD 305-55 0.38 232.37 220.20 305.55 I00.00 0.678 0.9"AV 5949776.31 645502.04 !.!9~2.15..11 0.94 0.06 1.95 0.06 O.4 0.678 0.97W 2.22 2.22 322.24 035 DPH~PBD ~5.S5 0.30 210.78 320~0 405J5 I~.00 IAOS 13~ 5949775.87645~01.65 I.~1~i !.47 ~.08 -21-59 O.l~ O.~ I.lOS 13~V 2.44 2-~ 314.~ 0.~ BPHO-PBO ~05,55 0.20 229.05 4lO.19 50154 IO0.00 l.~S 1.6~V 5949775.53 645501.39 ~1~.64 1.17 ~.10 18~7 0.13 03 1.44S 1.~ 2.71 Z71 316.63 1.05 BPH~PBD 605,55 035 124.80 520.19 605.54 IO0.00 1.83 S 1.3~V 5949775,1:5 645501.66 Z2~l&gr2 2,16 0.35 -1~.23 0.~ [3 1.83 8 13~V 3,03 3.03 3~.~ 130 BPH~PBD 705,53 1.58 99.13 620.17 q05J2 I00.~ 232S 0.381 5949774.69 645503.42 ~l~.~ 2.10 1.03 -~.67 IAI Z4 2.32S 0381 3J7 336 1.~ I J5 BPH~PBD 805.~5 2.17 92.2~ ~.12 805.47 IO0.00 2.62S 3.631 5949774.46 ~506.68 ~1~.75 1=19 0-59 ~.88 0.~ 3.0 2.62S 3.~E 3.73 3.~ 359.8~ l.~ BPli~PBD 905.55 3.8.1 101.03 819.98 90533 IO0.00 3__33S 8.801 5949773.84 645511.87 9.4~110.71 0.51 !.66 g.78 I.T~ 4.8 333-q 8.8~01 4.11 4.09 7.45 2.0~ BPHG-?BD 1005.:55 4.O7 102.93 919.74 1005.09 IO0.00 4.76 S 13.34 E 5949772.54 645518.63 16,2~107.04 ,O. 17 0.24 1.90 0.27 5,0 4.76 S 15.54 E 4.~0 4.48 9.21 2.12 BBHG-?BD !105,5~ 3.63 101.~0 1019.52 1104.87 lO0.00 6.205 22.121 5949771.23 645525.23 22.97~105,65 ,0.79 -0.42 -t J3 0,43 5.:~ 6.20S 22,12£ 4.90 4.87 8.84 2.56 BPHG-PBD 1205.55 3.02 101.27 I 119.35 1204.70 lO0.00 715 S 27.8'2 E 5949770.19 64553035 20.T/~IO4~O -!,42 -0.63 -033 O.6~ ~.I 7.35 g 27.82 E 5.31 5.28 1.82 2.81 BPHO-?BD 1305.55 2.82 ~9.0:5 1219.22 1304.57 IO0.00 1.25.q 32.~ F. 5949769.39 645:533.98 33.8.~104.11 -2.08 -0.20 -2.22 0.2.1 6.3 8.25 $ 32.83 E 5,72 5.68 8.42 3.0~ BPHG-?BD 1405.55 2.32 89,12 1319A2 1404.47 IO0.00 a.61 S 37.28E 594976~.12 645540.44 3~103.OO -3.09 -0.50 -9.93 0.67 7.0 8.61 S 37.281 6,13 6.10 6,4'7 3..31 BPHG-PBD 1505,~5 !.97 83.53 1419.05 1504.40 I00.00 8.38 S 41.021 5949769,41 645544.17 41.Rei~lOIJ5 -4.43 -035 -5.59 0.41 7.4 838S 41.02E 6.55 6.51 5..12 335 BPHO-?BD 1605,33 !.63 84,35 1519.00 1604.35 IO0.00 I.O3 $ 44.14 E 5~49769.81 645:547.28 44.8'~0034 -5.~9 -0-34 0,82 0"34 7,7 8.05 S 44.14 E 6.97 6.93 5.02 3.80 BPHG-PBD 1703,:55 I.I 8 86,70 1618,97 170432 100.043 7.8:5 S 46.58 £ 5949770.05 645549.72 47.24~ 9~37 -6.62 -0.45 2.3:5 0.4:~ 1.2 7.8~ $ 4&58 E 739 735 :5.0~ 4.05 BPHG-PBD 1805.55 I.O2 85=10 1718.95 180430 100.00 7.7ZS 48.50E 5949770.22 645:551.53 49.11~ 'J9,04 -733 ~.16 -l.~ 0,16 ~4 7.~S 4~501 7,81 7.~ 4.7~ 4.30 BPHO-P~ 1905.55 0.~ 87.78 1818.93 l~2g 100.~ 7.51 S 50.20 E 594~70,36 6435~333 ~.~ ~,63 -7.94 ~.09 2.48 0.10 1.5 7.61 S 50.20 E [~ 8.19 4.~ ~5 BPHG-PBD 2~3,~5 0.6~ 103,25 1918.92 2~27 100.~ 7.71S 51361 ~9497~.29 645554.69 $~1~ 98.51 ~.26 ~.28 15,47 035 1.8 731 ~ 5I~E 8.~ 8~2 5.~ 4.80 BPH~P~ 2105.5:5 0.63 !14=15 2018.92 2104.27 100.00 8.07S 52.61E :5949769.95 645355.75 -$3.23~ 9172 -I.24 ~0.02 11,10 0.I3 0.9 8.078 52.61E 9.08 9.04 5.38 :5.05 BPHG~BD 2205.55 0.65 i 17.08 2118.91 2204.26 100.00 13:5 S 53.62 E 5949769.49 645:5:~6.77 $4-30~ 9e~.06 -1.08 0.02 2.73 0.04 9.0 835 g 33.62 E 931 9.47 6.05 5.30 BPHG-?BD 2305,55 0.60 i 1938 2218.90 2304.23 lO0.00 9.07 S 54.58 E 5949768.99 645557.74 $3.33~ 99.43 -7.88 -0.05 2.30 0,0~ 9.0 9.07 S $4.38 E 9,93 9.89 6.45 5.:55 BPHO-FBD 2405.53 0.50 131.98 2318.90 2404.25 100.00 9.62 S 55.36 E 594976~.46 645558.33 36.19~ 99.86 .7.60 -0.10 12.60 0.16 9.2 9.62 $ 53.36E 10.36 10.32 6.94 I80 BPHO-PBD Gas Cons. Commission Anchorage Halliburton Energy Services - Drilling Sysgems PSL Prmltosal Report Page %¥ellp,,th ID: Y- 14AWp2 Measured Incl Drift Subscm TVD Cour~c T O T A L GRID Caordinales Cl~ure ¥a. lkal Build Walk DIS C~m. Exlx~ed Total &bi Hi- &lin Hot Dh'. Vet~ gmwey Tool D~th Dh'. Depth Length Re;'tang~larOlfs~s Not~l~ng Easling Did. Dir. ~tio~ Rate Rate Dogleg RectmgularCoonls Enm- Error MnxE~ (Il) (c~g.) (~) (n) (Ii) (ii) (a) (~L) (n) (a) (0.) (de~) ~) (d5/1001~) (dgtmoon) (dg/lOOfl) (dcg) (ti) (t~) (ti) (11) (d¢~) (n) 2505.55 0.62 129.03 2418.90 2504.25 t00.00 10.25S 5~.IOE 5949767.84645559.29 57.0~i'~100-15 -7.22 0.12 =2.95 0.12 9.3 10.258 56.10E 10.79 10.75 7.63 6.05 BPHCr-PBD ~60X)5 0.57 120.02 2~18.89 2604.24 100.00 10-845 $6.%£ $949767.27645560.15 57.91~100.78 -~.92 -0.05 -9.01 O. 1l 9.4 t0.g4S 56.96E 11.22 11.18 7.87 6.30 BPHO.PBI) 2705.55 0.47 1:!0.30 2618.89 2704.24 100.O0 11353 57.70E $949766.77645560.90 58.81~101.13 .6.65 -0. i0 t0.28 0.14 9.:S It..lSS 87.70E 11.64 11.61 e.i5 6.55 2805.55 0.42 130.18 2718.88 2804.23 100-00 11.86S $IL~9£ 5949766.28645~61.$1 59.49{~101.50 -&..35 -4}.05 -0.12 0.05 9.6 t1.86S 58.29E 12.07 12.04 8.57 6.80 BPHC--PBD 2905.55 0.47 149.30 2818.88 2904.23 100.00 12.45 S 51LT~E 5949765.70 645562.01 60.08~101.95 -$.94 0.05 19.12 0.16 9.8 12.45 $ 38.78 E 12.50 12.47 9.25 7.05 BPHG-PBD 3005.55 0.50 157.03 2918.88 3004.23 100.00 13.205 59.16E $949764.95645562.40 60.62~102.58 -$33 0.03 7.73 0.07 9.8 13.208 59.16E 12.93 12.90 9.95 7..10 BPHG-PBD 3105.55 0.58 155.78 3018.87 3104.22 100.O0 14.065 59.54E 5949764.09645562.79 61.18~103.29 -4.63 0.08 -I.25 0.08 9.9 14.04S 59-54E 13.36 13.33 10.87 7..$5 BPHG-PBD 3205.5~ 0.f,O 161.50 31t8.87 3204.22 I00.00 15.02S 59.91E 5949763.1464~563.19 61.7~I~t04.07 -3.83 0.02 ~.72 9.06 !0.0 15.028 $9.91E 13.80 13.76 11.70 7.80 BPHG-PBD 3305.55 0.65 165.35 3218.86 3304.21 I00.00 16-075 60.22E $949762.10645563.52 62.33~104.94 -2.92 0.05 3.85 0.07 10.0 16.078 60.22E 14.23 14A9 12.69 8.05 BPHG-PnD 3405.55 0.$7 177.13 3318.8& 3404.21 lO0.00 17.11 $ ~0.39E 5949761.06 645563.?0 62.778..ii}105.82 -1.98 -O.08 il.78 0.15 10.2 17.11 s 60.39E 14.65 14.63 13.23 S.30 BPHC,-PBD 3505.5S 0.SS tS5.45 3418.8.5 3504.20 1O0.0O 18.095 60.37E 5949760.0964S563.70 63.02~t06.08 -LO4 -0.02 8.32 o.es 10.3 Ig.09S (;0.37£ 15.09 I$.06 13.91 8.55 BI*HO-PBD 3605.55 0.57 187.90 3518.85 3604.20 III0.00 m9.068 60.26E 59497~9.11645563.61 63.20f'~07.55 .41.08 0-02 2.45 0.0:} 103 19.0~s 60.26E 15.52 1~$.49 14.7{; 8.80 BPHC,-PBD 3705.55 0.47 187.88 3618.84 37o4.19 l~)O.00 19.96S 60.13E 5949738.21645563.5'0 63.36"~108.36 0.~1 -0.10 -0.02 0.10 10.4 19.968 60.13£ 15.95 1:$.92 15.43 9.05 Bt~HC,-PBO 3805..$5 0..52 185.42 3718.84 31104.19 lO0.00 20.81 S 60.03 E 59'49757.35 645.563.42 63-540:109. m2 1.~,~ 0.05 -2.46 0.0.~ 10.4 2O.ml g 60.03 E t6.39 16.36 1632 930 ePHO.I'BD 3905.58 0.53 186.33 3818.83 3904.18 100.00 21.733 59.94E 59497~.44645563.34 63.7~t~...109.92 7..56 0.0t 0.91 0.Ol t0.$ 21.73S 59.94E 16.82 16.79 17.13 9.55 EIPHG.PBD 40~5.55 1.28 185.93 3918.82 4004.17 100.O0 23"30~ 59.77E 5949754.87645563.21 64.15~111.29 4.10 0.75 .0.40 0.75 11.2 ' 23"308 59.77E 17.25 17.22 20.90 9.80 BPIIo.?eo 4105.55 4.~0 177.23 4018.67 4104.02 100.00 28.415 59.85E 5949749.75645563"38 66-25'~11~.40 g.96 3.32 ..B.70 3.34 14.6 28.415 59.85E 17.67 17.62 70.79 I0.14 BI*HG.I~BD 4205.55 8.65 179.10 4117.~9 4203.34 100.00 39.945 ¢0.16E 5949738.23445563.92 72.21~123.50 19.85 4.05 1.87 4.06 18.6 39.948 60.161: tS. il 17.91 o.')m 10.64 BPHO-I, Bo 4305.55 12.87 181.87 4216.21 4301.56 I00.00 58.605 59.9ZE 5949719.57645564.03 83.gm~m34.16 37.71 4.22 2.77 4_2~ 22.9 5~.605 ~9.92E t8.55 18.09 98.70 !1.31 4405.55 16.17 181.75 4313.00 439835 100.00 ~3.668 $9.13E 5949694_51 645563.73 102.44~144.75 61.83 3.30 .0.12 330 26.2 83.66S 59.13E 19.01 18.24 89.06 !t.99 BPHO-PBO 4305.55 18.97 183.58 4408"33 4493.68 t00.00 113.805 _~7.69E 5949664.34645562.87 127.59~153.1:Z 90.99 2.g0 1.8:) 2.85 29.0 113.805 57.69E t9.49 18.38 271.01 12.67 BPHG-PBD 4605.55 22.33 185.27 4501.89 4587.24 100.00 148.928 54.~3E 5949629.15 645560.79 158.76~159.'7~ 125..33 3.36 1.69 3.41 32.4 148.955 54.93E 19.99 1839 272.84 13.51 BPHO-PBD 4705,25 25.12 185,07 4:$93.43 4678.78 t00.O0 Isg.02S 5t_31E 5949:189.026455.T7.95 195.8((-a,.~164-81 164.61 2.79 -0.20 2.79 35.2 189,025 51.3rE 20.52 18.40 272.77 14.31 BPHO-I'eO 450:S.5.~ 28.07 18~.:~3 4~82.84 4765.19 t00,00 233.~95 47. t6£ 5949544-186455';4.66 238"30~1~8.$~ 2o8..14 2.95 0.4~ 2.96 38.2 233,595 47.16E 21.08 18.33 :Z73.31 15.19 ]3PHG.?BD 4905..55 31.97 188.10 4769.41 4854,76 100.00 283.245 41.16E 5949494.6364:1549.63 286,21~171.7'J 257.48 3.90 2.57 4.11 42.3 283.245 41.16E 2m.68 18.02 275,76 16.30 BPHO-I'BO :1005.:55 35.98 190.28 4852.32 4937.67 100.00 338-18s 32.19E 594943934645541.72 339.9(~74.57 31:74 4.01 2.18 4.19 4~.5 33L38S 32.19E 22.35 17.55 277.81 17.49 BPHG. PBD 5105.55 38.48 192.57 493L94 5017.29 100.00 397.(;65 20.17E 5949379.84645530.85 398.1"~q,T'/.IO 377..88 2.20 2.29 2.86 49.3 397.665 20.17E 23.08 17_19 2,79.76 18.37 BPHG-?BD 52o).:I) 38.61~-' 192..55 30'10~12 3095.47-- 100,150- 458'_53'S--- 6.61 if. -5¥~9~] 1~.72 64551~1.47 4511~8~79~1'7~'4~5--045 .... 0.20-------0~O'Z' 0.2o 4~)J 458.53 S 6,61F, --23.'g&"---'IT.~;9--'Z'D~'.61 1&7~ Ut'HU-t'UO 5305.5S 38.55 192.43 5088.25 5173.60 100.00 519.46~ 6.90W 5949257.$:1642506.14 :$19.50~!80.7~ 4~7.16 -0.13 -0.10 0.14 49.7 :119.46S 6.90W 24.48 18-07 279.4~ 19.o5 540~.55 38.4~ 192.2o 51~6-51 5251.8& 100.00 580.278 20.19~V 5949196.49645494.03 580.621~181.9~ 559.14 .0.10 "0.25 0.18 49.9 511o.275 20.19W 25.:14 18.45 279.19 19=37 BPHC,-?BD 5505.:15 38.38 192.15 5244.87 5330.22 I~0.00 641.0~$ 33.29W 5949135.S2645482.11 641.87~1112.97 0'21.00 -O.07 -0.0~ 0.08 49.9 641.015 33.299/ 26.42 18.82 279.13 19.69 BPHO.?BD 560~.55 38.30 192.13 532330 5408.65 100-00 70[.668 4~.34W 5949074.63645470.24 703.18~183.78 682.75 -O.08 -0.02 0-08 50.0 70i.665 46.34W 27.32 19.20 279.12 20.01 BPHO-PBD 5705-5~ 38.:18 192.18 5401.43 5486.98 100.00 762.43 g 59.4~¥ 5949013.62 645458.32 764.74~184.4~ 744.63 o.28 0.05 0.28 50.3 762.43 ~ 59.43W 28.25 19.49 279.20 20.41 BPHG-PBD .q805.:55 38.$0 192.08 5479.84 .$565.19 m~0-00 823.355 72.SZ~V 5948952.4764544(;.41 826,53(~185.03 ~O6.fi5 -O.08 -0.10 0.10 ~.4 823,355 72,5~v 29.21 19,~ 2~,m7 20.73 BPH~PBD 5905.35 38.~ 192.03 5557.89 5643.24 I~.O0 88~49S 85~V 5948~1.0964~3~54 888.6~185~ ~88 0.~ ~.05 0.~ 50.8 884.495 85.5~V 30.19 20.13 2~.22 2t.17 BPH~PBD ~05-55 38.~ 191.82 5635.71 $~1.06 I~.Oo 945.~8 98J~V 5948829,4164~2~75 951.0~185~ ~7 0.~ ~.21 0.13 ~.9 94S.93S 98.58V 31.19 20.~ 2~.16 21.$t B~H~PBD 6105.55 38.95 191.82 5713~t 5798.86 m~.O0 l~7.~S 111.4~ $94~67.68 645411-07 1013.~18~1 W3.87 0.0~ 0.~ 0.05 ~1.0 1~7.43 S tll.4~V 3221 20.84 2~.22 21.87 BPH~BD ~205.55 38.88 t91.67 $~1~1 5~&.~6 1~-00 1~8 12~tW ~94~05.956453~.48 1076.1~18~ 10~6.36 ~.07 ~.I~ 0.12 51.1 10~.93~ 124.21W 33.25 21.~ 2~.21 ~.i9 B~PBD 6305.55 38.92 191.62 5869.14 59~.49 100.00 1130.~S I~.~ 59486~.22645387.99 1138.&~18~ i11~.81 0.04 ~.0~ 0.05 51.1 !i30.~S 13G.~V 3430 21.~8 2~.24 2~54 BPH~PBD ~5.55 38.55 191.67 5947.~ 6~2.~ 100.00 1191.~g 149~ ~948~.~4645376-54 1201.1~i87.1~ IiSI.ti ~.27 0.05 0.27 $1.4 1191.798 149.5~V 35-15 2~02 279-11 22.81 B~O-PBD 6505.55 38.55 191.~ 6025.24 6110.59 1O0.00 1252.88S 162.1~V $94~21.32645365-07 1263~187~8 1243.17 ~.10 0.0~ 0.1~ 51.5 1~888 1~2.1~ 3&.41 22.42 279.38 23.12 B~O-PBD (- c --I o ~z SEP '12 1995 Gas Cons. Commission Halliburton Energy Services - Drilling Systems PSL Proposal Report Pase3 D~sle: 7/6/95 ID: Y-14AWp2 Ix leasured tncl Drift Subsen TVD Caum T O T A L G~D C~ C~ ~e~.l ~ild ~a~ D~ ~ ~d To~l ~l~x H~ Min H~ ~. V~ D~ Dir. ~ ~ R~l~Off~ N~g ~g ~ D~. ~i~ ~ ~ ~ R~I~& E~ E~ M~xE~ 6603.55 38.78 L91.75 6103.32 6188.67 100.~ 1314.05g t74.~ 594~59.~645353.$4 132~.6~1~.5g 1305.3t 0.23 0.02 0.~ 51.8 13i4.0SS 174.S%V 37.49 22.~ 2~.~ 23.53 BPHG.PBD 6705.55 39.37 191.73 61~.95 62~.30 100.~ 137~.76S I ST.~ 594~97.97~534t.9t 13~1~1~.77 1368.02 0.59. ~.02 0.59 52.3 1375.76g 1~.7~V 3a.~ 22.91 2~.~3 24.~ BPHG-PBD 6805.55 39.~5 t91.90 62~7.99 6343.34 100.~ 1438.17S 200.~' 594~35.33645330.06 145Zl~gg.g5 ~431.~ 0.~ 0.17 ~49 52.n 143~.17g 2~.7~V 39.72 23.13 279.66 24.53 BPH~PBD 6905~5 40.45 192.03 ~34.43 64i9.78 100.~ [501.25S 214.1~ 594~272.01 ~S317.91 151~8g.12 1495.61 0.~ 0.13 0.61 53.4 ]501.25S 2~4.1~V 40.8~ 23.31 2~.78 25.~ BPHO-PBD 710~.55 4~05 19230 ~.70 6570.05 10o.~ 1630.30g 241.71W 5~814~M52~.84 164ti~Sg.43 1626.95 0.~ 0.3~ 0.76 SS.~ reredOS 24~.TtXV 4~.2~ 2~.~0 2~.02 2~.2S 7205.5~ 42.53 192.57 65~.67 6~4.02 t00.O0 I696.01S 2~6.2~' 594~076.49 ~52~.62 171~.~S~59 I693~7 0.4~ 0.27 0.~1 55.6 16~.OtS 2~.2~V ~.50 23.70 2~.!8 26.76 BPHO-PHD 7305.55 42.70 192.7g 663~7 6717.62 t00.O0 1762.07S 27~.~' 594g010.166452~.04 1~g8.95 t76L42 o, t7 0.2~ 0.22 ss.s tT~oTs 27~.0~v as.Ts ~4,~ 2~.3t 27,n 7405~5 42.~ 193.13 6705.70 6~i.05 too.oo Ig2~.22s 296.2~, 5947943,73~525~10 lgS~sg.90 ts~.os 0.~0 03s 0.2~ ~.~ ~e2~.22s 2~.2~v 47.0~ 24~3 2~.49 27,s~ 7505~5 42.~ 193.~ 6779.05 6864.40 I00.00 1894.36g 301.9~~ 5947~7.31 ~5237.74 191g.2~.06 1~96.85 0.03 0.35 0.24 ~.3 lg94~68 301.9~V 4~.28 24.69 280.66 27.93 B~HO-PBD 7605.55 42.78 193.72 68~2.42 6937.77 I~.00 19~.4t S 317.~' 5947810.97 6452~.04 1986.O~.21 1964.63 .0.05 0.24 0. I7 56.5 t~.4l S 3tT.~V 49.55 25.~ 2~.79 28.27 BPH~PBD 7705.5~ 4~97 193.85 6~.70 701L05 I~.00 2026.493 334.~l~t 5947744.~ ~5208.11 205~R936 2032.52 . 049 0.13 0.21 ~.7 202~.49S 334.1t~V 50.84 25~ 2~.90 28.69 BPH~PBD 7~5~5 43.t~ 193.85 6~76 ~084.11 I~.00 2092.79~ 350.4~t 5947678.00 645193.04 2121.9~lag.St 2100.~ 0.~ 0.~ 0.~ ~.9 2092.79S 350.4~V 52.13 25.6~ 280.98 29.12 BPH~PHD 7905~5 42.70 194.08 7071.~ 7157.32 I~.00 2158.89S 366.8~ 5947611.~964~177.88 21~.~189.64 216163 -0.47 0.~ ~50 57.4 2138.89~ 366.~V 53.42 26.20 2g1.09 29.32 8005.55 42.32 194.27 7145.68 7231.03 I~.00 2224.4t~ 3~.4~V 5947545.78 645152~0 22S7.2~!89.18 2236.0g ~.38 0.19 0.~ 57.8 2224.41 ~ 3~3.4~V 54.70 26.72 281.20 29.~ 8105.55 41.93 194~7 7219.85 ~05.20 I~.00 2289.~S 400.0~[t 5947480.4864~t47.27 232~0~189.91 2303.05 .0.39 0.10 0.40 58.2 22~.40g 400.0~' 55.97 27.24 2g1.28 29.76 BPH~PBD 820~.53 41.95 194.82 7294.24 ~379.59 I00.00 23~4.08~ 416.8~V 5947415.50645131.6~ 23~.~1~.04 2369.~ 0.02 0.45 0.30 5~.$ ~.08S 41~V 57.25 ~7.~ 2~1.45 30.12 8305.~5 41.38 195.25 ~68.94 745(29 I00.00 2418.28g 434.1lW 5947350.986451t5.68 2~190.18 2436.20 ~.57 0.43 0.64 ~9. t 2418~8~ 434.11W 58.50 28.21 281.61 30.27 BPH~PBD 8~.55 40.60 19~.95 7~4.42 7529.77 I00.00 2481.453 451.7RV 594~.48645~9.26 ~2Z~[~.32 2501.75 ~.78 0.70 0.91 ~0.0 2~1.45S 4~1.7~V 59.74 28.90 2~1.82 30.34 BPHO-fBD 8505.55 40.03 196.47 7520.67 7606.02 I00.00 2543.38~ 469.81~t 5947225.026450~2.~ ~.~t~.46 2566.42 ~.57 0.~2 0.~ ~.7 ~43.58g ~9.81W ~5 29.~1 281~9 30.47 ~PH~BD S~5.55 39.83 197.77 7597~6 768~71 lO0.00 2~4.923 488.~~ 5947163.34645~4.70 26~1~.63 2630.~ ~.20 130 0.~6 61.6 260¢.92S 488.7~V 62.15 30.00 2~4 30.75 ~PH~BD 8705.55 40.07 19~.87 7674.02 ~39.37 I00.00 2~5.87~ 508.8~V 5947102.01645~5.69 271~0~1~.81 2694.81 0.24 1.10 0.75 62.3 2665.~S 50g.8~V 63.36 3032 28~68 3t.t9 aPH~PBD 8805.55 39.43 199.25 ~50.90 7836.25 I00.00 2726~1 S 529.7~V 5947~1.18645025.98 2~.3~191.00 275~ ~.~ 0.38 0.68 ~.0 2726.3lg 529.7~V ~.56 30.96 28~84 31.29 BPH~PBD ~905.5~ 38.77 1~9.77 ~28.51 7913.g6 I00.~ 2785.76g 550~V 59~8~.35645~07 2~9.6~191.18 2~1.~ ~.~ 03~ 0.74 ~.7 2785.7~S 550.~V 65.75 31.6l 2~.02 31.37 BPHO-~BD 9005.55 38.02 200.10 ~06.88 79~ I00.~ 2~.14S 5~V 59~92X576~8~ 2~1.~191~7 2883.82 ~.75 033 0.78 , ~.S 28~14g 57Z0~V ~I 3~0 2~.16 31.42 BPH~PBD 9105.55 37.65 1~.98 ~8~.86 ~71.21 100.~ ~1.77S 593.0~V 59~864.55 6~%6.11 ~1.~19135 29~.11 ~.37 ~.12 038 M.9 2901.77S 593.0~ 68.07 3Z81 2~.24 31.61 BPH~PBD 9205.~ 37.03 200.42 ~65.37 8150.72 100.~ 2958.693 613.~ 5946807.246~9q6.27 3~1.~191.72 3~5.70 ~.g2 0.~ 0.67 6~.~ ~58.69~ 613.~ 69~0 33.47 2~.40 31.69 BPHO-PBD g40S.55 35.38 2~.08 ~226.68 ~12.03 [00.~ 3068.51g 657.71W 59~6~.61 6~4.~ 3i3~!9Z10 31~.61 ~.~ i.36 1.19 67.~ 3068JIS 6~7.7~W 71.36 34.98 2~.97 31.(6 BPH~BD KOP/TIE ~ ! ~TER~LA~D PO~/ST~T OF ~ ~ 6.00 de~l~ ~ 9450.00 35.02 203.73 8263.00 ~48~ 44.45 309~02S ~7.8~ 59466~916~4.~ 3163~19XI9 3149.10 ~.82 1.45 1.17 683 ~0ZS ~7.8~V 71.82 3532 2~10 ~1.66 BPHO-PBD 9550.00 37.21 194~4 ~43.84 ~29.19 1O0.~ 3147.655 686.8~ 59~616.936~876.~ 3~1.~192.31 3~7.~ 2.19 ~.49 6.~ 74~ 3147.78S 6~63~ ~.85 3432 2g~84 3Z86 BP~-PBD END OF 9647.~ ~.00 l~.OO ~20.00 ~50~.35 ~7.~ 3207.38S 697.41W 5946557.01 6~7.62 32~192~7 3267.98 2.~ ~.~ ~ ~.2 3207.54g 696.6~V ~.79 33.7~ 281.42 34~3 BPHM-PBD ~T OFC~ 12.00 &fflO0 R ~9~.20 ~.00 1~.00 ~.24 8762.59 335.~ 3422.04S 719.9~V 3946341.976~M9.20 349L~191.88 34~.~ 0.~ 0.~ 0.~ ~0.2 342~0S 718~V ~.56 34.~ 281.12 35.28 BP~i-PBD 100~.20 49.~ 1~.55 ~.30 8833.6~ 1OO.~ 3490.68S ~4./IW 59462~.086~6.29 3567.~191.88 3549.13 9.~ 10.5~ IL~ 9Z2 ~91.23g ~l~V ~.03 30.70 2~9 39.~5 101~.20 ~9.64 2~9 ~.2g 88~!.63 1O~.~ 3~.68S 76~9~ 59461~.546~.01 3~192.07 3630.26 10.1~ 7.M I~ 104.2 35~.00g 75g.61W 80.~2 26.~ 28~.18 43.58 BP~i-~D 102~.20 70.20 210.71 ~848.64 ~33.99 le0.~ 36~.72~ S~9~V 5946115.926~768.~6 3~19~4S 3719.25 [0.56 6.32 i~ U6.2 3649.458 798.2~V ~.!0 22.M 2~.~ ~.~ BP~-PBD 103~.20 ~.95 216.23 88~,53 ~8.88 le~.00 3727.29S 8Sg.3~V 5946034.15644716.71 3~8~192.97 3gl2,21 10,7~ 5.52 12.~ 128.2 3732.10g 848.~V ~,88 21,~ 2~.60 49,~ B~-PBD ~D OF 10455.47 88.~ 2~.00 88~.00 ~65.35 72.27 37~.83g ~0L7RV ~94~976.74644673.~ 3~.0~t93.42 3879.57 10.~ 5.2I I~ 136.9 37~,48g 891.0~V ~,29 21.94 291.02 4~.8S Halliburton Energy Services - Drilling Systems PSL Proposal Repor~ Page 4 Dale: 7/6/9.5 ID: Y-I 4AWp2 Tool 11205.47 88.7'7 220.00 88~6.05 8981.40 750.00 43.58.2.5S 1394.73W 594.5393.25 644202.4~ 4572.9-T'~197.1;3 4572.95 0.00 0.00 O.0ll136.9 43~3,81 g 13:50.45W110.31 23.64 296.]6$3.88BPH~I-PBD S EP 1 2 1995 Oil & Gas Cons. Commission Anchorage Halliburton Energy Services - Drilling Systems PSL Proposal Report Page 4 Dale: 7/6/~5 Weilpth ID: Y-I 4AWp2 Measut~ Iact Dr~ Subsea TV'D Course T O T A L O~D ~ra~ Cl~ge V~i~I Build Walk D~ ~ E~ T~I Max H~ M~ Hoz D~. V~ D~ D~. ~p~ ~e~ ~!~ O~ No~g ~ D~ ~. ~i~ R~te ~e ~ Re~l~ ~ ~ E~ ~ ~ E~r gu~ey Too] 11205.47 88.77 220.0'0 8896.0.5 8981.40 750.00 4358.25S 1384,731A' 5945393.25 644202.411 4572.9Y/~1~7.~3 45'72.95 0,00 0.00 0.0O 136.9 43~3.81 g 1350.45W 110.31 '23.64 296.]~ 53.811 Bi~HM. PBD C: I-- F- H WELL PERMIT CHECKLIST ~M~NrS~±5,~ ............ 1. 8. 9. 10. 11. 12. 13. ENGINEERING permit fee attached .................. F Lease number appropriate ............... ~ Unique well name and number .............. ./Y Well located in a defined pool ............. t~ Well located proper distance from drlg unit boundary., t2 Well located proper distance from other wells ..... 'I~ sufficient acreage available in drilling unit ..... Y If deviated, is wellbore plat included ........ ~ Operator only affected party ............... Y Operator has appropriate bond in force .......... Y Permit can be issued without conservation order .... Y Permit can be issued without administrative approval. 'i 'Y Can permit be approved before 15-day wait ....... ~ WELL NAME GEOL AREA APPR DATE -. ~ ~ ~ . .: GEOLOGY 14. Conductor string provided ................ 15. Surface casing protects all known USDWs ......... 16. CMT vol adequate to circulate on conductor & surf csg. 17. CMT vol adequate to tie-in long string to surf csg . . 18. CMT will cover all known productive horizons ..... ~~-~'~------/~ 19. Casing designs adeq~at, for C, T, B & pe=frost .... 20. Adequate tankage or rese~e pit ............ 22. Adequate wellbore separation proposed .......... 23. If diverter required, is it adequate .......... 24. Drilling fluid progr~ sch~atic & equip list adequate 25. BOPEs adequate ..................... 26. BOPE press rating adequate; test to ~~ psig.~ 27. Choke manifold complies w/~I ~-53 (Ma~ 84) ...... 28. Work will occur without operation shutdo~ ....... 29. Is presen:e of ~2s gas probable ............ / 30. Permit can be issued w/o hydrogen sulfide measures .... Y N 31. Data presented on potential overpressure zones ..... y / 32. Seismic analysis 9f shallow gas zones .......... Y/ N 33. Seabed condition survey (if off-shore) ......... / N ' 34. Contact name/phone for weekly progress reports .... /Y N [exploratory only] · , GEOLOGY: ENGINEERING: COMMISSION: Comments/Instructions: '3RMS~cheklist rev 03/94 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. .~pe Subfile 2 is type: TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: AP1 NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 6621.00 S. BURKHARDT V. HAZARD Y-14A 500292183201 BP EXPLORATION (ALASKA) INC. SPERRY-SUN DRILLING SERVICES 26-AUG-96 MWD RUN 2 S. BURKHARDT V. HAZARD MWD RUN 3 HENNINGSEN V. HAZARD MWDRUN 4 JOB NUMBER: LOGGING ENGINEER: HENNINGSEN OPERATOR WITNESS: V. HAZARD SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 21 liN 13E 4788 4574 82.88 81.38 48.77 OPEN HOLE CASING DRI~~ BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 13.375 2691.0 2ND STRING 9.625 9416.0 3RD STRING 8.500 7.000 10545.0 PRODUCTION STRING 6.000 11300.0 REMARKS: MWD - EWR4/GR. ALL DEPTHS ARE MEASURED BIT DEPTHS. THIS WELL, Y-14A, IS REPRESENTED BY RUNS 1 - 4. MWD RUNS 1 & 2 WERE DIRECTIONAL WITH GAMMA R_AY (SGRC). MWD RUNS 3 & 4 WERE DIRECTIONAL WITH GAMMA RAY (SGRC) & ELECTROMAGNETIC WAVE 4-PHASE RESISTIVITY (EWR4). ALL GAMMA RAY DATA WAS ACQUIRED WITH DUAL GAMMA RAY, GEIGER MUELLER TUBE DETECTORS (DGR/SGRC). A POSITIVE SHIFT OF 1.2 AAPI WAS NOTICED IN THE GAMMA RAY READINGS AFTER CHANGING OUT THE MUD SYSTEM TO FLO-PRO TYPE MUD AT 10471'. THIS WELL WAS DRILLED TO TD AT 11300'. NO DEPTH SHIFTS WERE DONE AS THIS LOG IS THE DEPTH REFERENCE FOR THIS WELL. FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE GR RP $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) START DEPTH 9300.0 10540.0 BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD $ REMARKs: STOP DEPTH 11259.0 11266.0 EQUIVALENT UNSHIFTED DEPTH BIT RUN NO MERGE TOP MERGE BASE 1 9195.0 10038.0 2 10038.0' 10551.0 3 10551.0 11081.0 4 11081.0 11300.0 MERGED MAIN PASS. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : Y- 14A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod GR MWD 68 1 AAPI RPX MWD 68 1 OHMM RPS MWD 68 1 OHMM RPM MWD 68 1 OHMM RPD MWD 68 1 OHMM FET MWD 68 1 HR R0P MWD 68 1 FPHR 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD '(T'.~ ~:# 0) 998 BYTES * 130 Total Data Records: Tape File Start Depth = 11300.000000 Tape File End Depth = 9300.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 32009 datums Tape Subfile: 2 225 records... Minimum record length: 62 bytes Maximum record length:- 998 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NTJMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9300.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ STOP DEPTH 9984.0 22-0CT-95 ISC 2.11 CIM 3.94 / SP4 5.01 / DEP 2.15 MEMORY 10038.0 9195.0 10038.0 0 35.4 41.7 TOOL NUMBER P0447CG6 BOREHOLE AND CASING DATA OPEN' HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 8.500 9416.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: BIOPOLYMER 9.90 65.0 10.9 37000 6.2 .000 .000 .000 .000 .0 142.0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .0 0 REMARKS: MWD RUN 1. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : Y- 14A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 18 Tape File Start Depth = 10040.000000 Tape File End Depth = 9300.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 4444 datums Tape Subfile: 3 81 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 9969.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY $ STOP DEPTH 10521.0 23-OCT-95 ISC 2.11 CIM 3.94 / SP4 5.01 / DEP 2.15 MEMORY 10551.0 10038.0 10551.0 0 41.3 84.7 TOOL NUMBER P0447CG6 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER' S CASING DEPTH (FT) : 8.500 9416.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPEP~ATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTR3~TE AT MT: MUD CAKE AT MT: BIOPOLYMER 10.10 63.0 8.9 34000 5.0 .000 .000 .000 .000 .0 155.0 .0 .0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): .0 0 REMARKS: MWD RUN 2. CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : Y-14A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 810 01 1 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 15 Tape File Start Depth = 10560.000000 Tape File End Depth = 9950.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 35673 datums Tape Subfile: 4 78 records... Minimum record length: Maximum record length: 62 bytes 1014' bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10327.0 EWR4 10316.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11040.0 11047.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ 27-0CT-95 ISC 2.11 CIM 3.94 / SP4 5.01 / DEP 2.15 MEMORY 11081.0 10551.0 11081.0 0 82.9 92.9 TOOL NUMBER P0433SP4 P0433SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.000 10545.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 8.90 83.0 10.1 45000 .0 .100 .056 .080 .110 78.0 146.0 78.0 78.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 3. $ : BP EXPLORATION (ALASKA) : Y- 14A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 52 Tape File Start Depth = 11100.000000 Tape File End Depth = 10300.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 17253 datums Tape Subfile: 5 117 records... Minimum record length: 62 bytes Maximum record length: 998 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW MW-D Curves and log header data for each bit run in separate files. BIT RUN NO: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 10995.0 EWR4 11001.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWN-HOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: STOP DEPTH 11259.0 11266.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY EWR4 ELECTROMAG. RESIS. 4 $ 27-OCT-95 ISC 2.11 CIM 3.94 / SP4 5.01 / DEP 2.15 MEMORY 11300.0 11081.0 11300.0 0 88.1 90.1 TOOL NUMBER P0433SP4 P0433SP4 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : 6.000 10545.0 BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TEMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: FLO-PRO 8.90 83.0 10.1 45000 .0 .090 .054 .080 .110 82.0 142.0 82.0 82.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): .00 .000 TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : .0 0 REMARKS: CN WN FN COUN STAT MWD RUN 4. $ : BP EXPLORATION (ALASKA) : Y-14A : PRUDHOE BAY : NORTH SLOPE : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 7 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR MWD 68 1 AAPI 4 2 RPX MWD 68 1 OHMM 4 3 RPS MWD 68 1 OHMM 4 4 RPM MWD 68 1 OHMM 4 5 RPD MWD 68 1 OHMM 4 6 FET MWD 68 1 HR 4 7 ROP MWD 68 1 FPHR 4 4 90 310 01 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 120 46 1 4 90 180 01 1 4 90 810 01 1 28 * DATA RECORD (TYPE# 0) 998 BYTES * Total Data Records: 21 Tape File Start Depth = 11300.000000 Tape File End Depth = 10990.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 40642 datums Tape Subfile: 6 86 records... Minimum record length: Maximum record length: 38 bytes 998 bytes Tape Subfile 7 is type: LIS 96/ 8/25 O1 **** REEL TRAILER **** 96/ 8/26 01 Tape Subfile: 7 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 26 AUG 96 1:24p Elapsed execution time = 1.54 seconds. SYSTEM RETURN CODE = 0